43.542.5
42.541.5
41.5
40.5
43.5 44.5
44.545.5
45.546.5
45.0
44.0
45.0
46.5
44.042.5
43.0
41.040.0
42.041.0
39.0
46.5
47.5 48.5
51.0
50.0
49.0
48.0
52.0 53.0
324.9m²
(C)
1018
1028
1027
1026
1006
10211020 10241022
1009
1015
1002
1010
1019
1005
1008
1017
1014
1004
1029
1003
1025
10131001
RESIDUE LOT 1035
1012
1011
1023
1007
RESIDUELOT 1034
1016
HANN
AFOR
D AV
ENUE
TINLINE STREET
GELT STREET
WOO
DGAT
E PA
RKW
AYBOUN
DARY
ROA
D
327.3m²
305.5m²
306.9m²
339.2m²
322.9m²
322.8m²
322.7m²
322.6m²
403.2m²
301.7m²
336.1m²431m²
304.4m²
324.6m²
308m²
315.7m²
424.7m²
325.4m²340.6m²339.5m²338.3m²337.2m²
301.2m²
344.5m²
311.8m²
311m²
307.7m²
376.7m²
AIRD
STR
EET
33.7
32
30.4
28.8
27.1
25.2
18.8
32.3
32.3
32.3
32.3
32.3
32.3
32.2
16.1 16.3
16.1 12.3 5.76.1
12.5
1010
1010
10.5
9.5
1612
.511
10.5
1010
.5
10.5 10.5 10.5 10.5 10.5 1012.5 18.4
30.9
30.9
11.4
10.5 10.5 10.5 10.5 10.5 10 12.5 14.418.4
20
17.4
16.3
32.1
32.2
32.3
32.4
32.5
32.6 34.3
13.2
17.2
10.5
10
26.9
26.326
.4
11.7
5.7
18.9
9.5
5.7
15.7
16.3
10.6
10.1
10.6
11.1
12.6
12.2
5.2
11.9
15
(A)
(A)
(A)
(A)
(A)
(A)
(B)
(C)
(C)
(C)
(C)
(C)
(C)
(C)
(C)
(C)
(C)
(C)
(A)
(A)
(C) (C) (C) (C) (C) (C)
(A)
(A)
(A) (C)
(A)
(A)
NORTH
W: www.gmrproperty.com.au A: level 31, Citigroup Centre
Project: Scale:
DENOTES CONCEPT SYDNEY WATER SEWER
E: [email protected] 2 Park St, Sydney NSW 2000
DENOTES 1V:1H SIDE BOUNDARY BATTERFOR FUTURE DROP EDGE BEAM
Appd. Date Revision DescriptionFirstIssue Drawn
Revis
ion
SA JM
SAB ISSUED FOR INFORMATIONJM
NORTH
W: www.gmrproperty.com.au A: level 31, Citigroup Centre
Project: Scale:
MARKETING PLANLOTS 1001-1029
DENOTES EASEMENT TO DRAIN WATER 1.5 WIDE.
DENOTES EASEMENT TO DRAIN WATER 2.5m WIDE.
DENOTES PROPOSED CONTOURS @ 0.5m INTERVALS47.0
LEGEND
(B)
DENOTES 1V:6H BATTER (MAX. 4m LONG)
DENOTES STORMWATER DRAINAGE
DENOTES RETAINING WALL (MAX. 1.2m HIGH)
DENOTES CONCEPT SYDNEY WATER SEWER
E: [email protected] 2 Park St, Sydney NSW 2000
NOTE: INFORMATION SHOWN IS SUBJECT TO COUNCIL & AUTHORITY APPROVALS AND MAY CHANGE
DENOTES 1V:1H SIDE BOUNDARY BATTERFOR FUTURE DROP EDGE BEAM
Appd. Date Revision DescriptionFirstIssue Drawn
Revis
ion
16/03/18
08/02/19
(C) DENOTES EASEMENT FOR REPAIRS 0.9m WIDE
TEMPORARY BASIN
ALBERT PARKSTAGE 2
19-25 BOUNDARY ROAD, BOX HILL
(A)
SAA ISSUED FOR INFORMATIONJM 16/03/18
FUTURE LOCAL PARK
SAC ISSUED FOR INFORMATIONJM 11/02/19JMD JM REVISED STREET NAME05/03/19
53
DP 1006799
CH 405.0
R242.500
WADHAM STREET
AIRD
STR
EET
TINLINE STREET
FELLING STREETFELLING STREET
WOO
DGAT
E PA
RKW
AYW
OODG
ATE
PARK
WAY
WOO
DGAT
E PA
RKW
AY
HERE
FORD
STR
EET
PRID
HAM
AVEN
UE
(A)(A)
(A)
(A)
(A)
(A)
(A)
(A)
(A)
(A)(A)(A)(A)(A)(A)
(B)
(B)
(B)
(B)
(B)(B) (B)
(B)
(B)
(B)
(B)
(B)
(B)
(B)
(B)
(B)
(B)
(B)
(B)
(B)
(B)
(B)
(B)
(B) (B) (B) (B)
(B) (B) (B)
(A) (A) (A)
2050
2022
2049
2038
2052
2020
2054
2051
2053
20472048 20442046 2045
2024 20252023 2026 2027
2037
2035
2036
2034
2033
RESIDUELOT 2140
20402041 2039
2029 2030
2042
2031
2043
2028 2032
(A) (A)
10.5
10
26.5
30.5
5.79.3
9.330
.5
26.5
5.7
30.5
10
30.1
30.230.5
30.6
13.710.5 12.510.5
22.1 6.713.7
17.2
13.7
9.514
30.8
9.59.5
32.8
34.8
17.2
18.3
13.5
18.1
5
10.514 10.512.510.5 10.55.7
11.426
10
12.5
12.5
1010
30.01
26
30.1
5.7
10.5
30.01
10.512.5
10.5
14
10.5
10.510.511.4 12.5
30.3
10.510.512.5
30.4
30.4
30.3
30.3
30.2
30.1
30.1 30 29.930
29.930
12.5
30.3
1410.510.5
30.4
12.5
30.5
10.510.511.4
30.5
12.5
30.01
9.7
29.8
10.5
9.7
30.6
9.7
18.3
30.01
29.830
.4
36.818.5
14.5
12.5
1410
10
398m²
305.7m² 398m²
339.9m²313.9m²
339.9m²
320.9m²
302m²
389.8m²
408.7m²
408.9m²
314.1m²
314.5m²
314.7m²
315.3m²
375.3m²
376.3m²
421.2m²
422.8m²
316.5m²
318m²
317.1m²
318.7m²
378.2m²
380.4m²
318.2m²
320.4m²
318.8m²
321.1m²
346.7m²
348.7m²
380.9m²
411.1m²
300.1m²
300.1m²
375.1m²
428.2m²
305.7m²
13.31010
30.5
1031
1033
10321030
2021381.6m²
50.0
50.0
48.0
47.0
46.5
45.5
44.0
52.0
49.0
47.048.0
46.0
45.0
43.0
34.0
33.5
34.0
33.0
51.0
36.0 35
.5
36.0
35.5
37.0
37.5
37.0
37.5
41.5
42.0
42.0
41.5
38.5
39.0
38.5
40.5
40.0
40.0
40.5
49.0
44.5
43.5
51.0
51.0 50.5
49.5
49.0
49.5
50.0
47.5
34.0
32.5
33.5
33.0
44.5
49.0
52.0
52.0
51.0
51.5
Project: Scale:
ALBERT PARK19-25 BOUNDARY ROAD, BOX HILL
MARKETING PLANLOTS 1030-1033, 2020-2054
DENOTES EASEMENT TO DRAIN WATER 1.5 WIDE.DENOTES EASEMENT FOR REPAIRS 0.9m WIDEDENOTES PROPOSED CONTOURS @ 0.5m INTERVALS47.0
LEGEND(A)
(B)
DENOTES 1V:6H BATTER (MAX. 4m LONG)
DENOTES STORMWATER DRAINAGE
DENOTES RETAINING WALL (MAX. 1.5m HIGH)
DENOTES CONCEPT SYDNEY WATER SEWER
NOTE: INFORMATION SHOWN IS SUBJECT TO COUNCIL & AUTHORITY APPROVALS AND MAY CHANGE
DENOTES 1V:1H SIDE BOUNDARY BATTERFOR FUTURE DROP EDGE BEAM
Appd. Date Revision DescriptionFirstIssue Drawn
Revis
ion
CY 23/10/17PB
JMB ISSUED FOR INFORMATIONPB 30/10/17CYA ISSUED FOR INFORMATIONPB 06/09/17
JMC ISSUED FOR INFORMATIONJM 09/04/18SAD ISSUED FOR INFORMATION- 08/02/19
W: www.goldmategroup.com A: level 18, Citigroup CentreE: [email protected] 2 Park St, Sydney NSW 2000
NORTH
53
DP 1006799
CH 405.0
R242.500
WADHAM STREET
TINLINE STREET
WOO
DGAT
E PA
RKW
AYW
OODG
ATE
PARK
WAY
HERE
FORD
STR
EET
PRID
HAM
AVEN
UE
(B)
(B)
(B)
(B)
(B)
(B) (B) (B) (B)(B)
(A)
(A) (A) (A) (A) (A) (A) (A)
(B)
(A)
(A)
(A)
53
DP 1006799
(A) (A)
(A)
(B)
(B)
(B)
(B)
53
DP 1006799
CH 405.0
R242.500
2010 20122008 2014 2134
2135
20022136
2017
2015
2018
2016
2019
2013
2007
20032001
2009
2004
2005
2006
2011445.4m²
383.1m²
300m²
444.5m²
351.9m²
381.3m² 439.8m²362.3m²361.2m²360.1m²359m²357.9m²356.8m²
418.2m²
309.3m²
311m²
300m²
303.5m²
330.2m²
336.6m²
372.5m²
282.8m²
48.0
46.5
46.0
47.0
45.5
45.0
44.0
43.0
42.5
41.5 40.0
39.5
38.5
38.037.0
37.5
36.0
36.5
35.0 34
.0
33.5
34.5
32.5
32.0
31.0
30.5
36.0
37.0 34
.5
39.0
5.822.1
8.811
.211
.1
10.3
5.6
26
10.5
10
35.7
10 10 10 10 10 27 4.8
24.2
20
11.7
10
14.3
10
30.5
11.2
10 9.610102912.5
12.5
12.5
35.6
12.5
10.5
10.8
10
3.2
37.4
9.3
9.3
11.1
10.3
30.5
30.3
9.5
24.6
39
16.3
11.7
35
10.9
9.16.7
18.5
18.5
28.2
18.5
30 30
10
10
30.5
26.6
35.2
35.2
29.6
29.3
10.5
7 7
27.5
27
12.8
36.3
36.2
36.13635.8
A-13.2
A-1.8
40.5
42.0
Project: Scale:
ALBERT PARK19-25 BOUNDARY ROAD, BOX HILL
MARKETING PLANLOTS 2001-2019 & 2134-2136
DENOTES EASEMENT TO DRAIN WATER 1.5 WIDE.DENOTES EASEMENT FOR REPAIRS 0.9m WIDEDENOTES PROPOSED CONTOURS @ 0.5m INTERVALS47.0
LEGEND(A)
(B)
DENOTES 1V:6H BATTER (MAX. 4m LONG)
DENOTES STORMWATER DRAINAGE
DENOTES RETAINING WALL (MAX. 1.5m HIGH)
DENOTES CONCEPT SYDNEY WATER SEWER
NOTE: INFORMATION SHOWN IS SUBJECT TO COUNCIL & AUTHORITY APPROVALS AND MAY CHANGE
DENOTES 1V:1H SIDE BOUNDARY BATTERFOR FUTURE DROP EDGE BEAM
Appd. Date Revision DescriptionFirstIssue Drawn
Revis
ion
CY 31/10/17PB
JMB ISSUED FOR INFORMATIONJM 09/04/18
DENOTES ELECTRICAL SUBSTATION
CYA ISSUED FOR INFORMATIONPB 31/10/17
W: www.goldmategroup.com A: level 18, Citigroup CentreE: [email protected] 2 Park St, Sydney NSW 2000
NORTH
SAC ISSUED FOR INFORMATION- 08/02/19
WADHAM STREET
TINLINE STREET
WOO
DGAT
E PA
RKW
AYW
OODG
ATE
PARK
WAY
WOO
DGAT
E PA
RKW
AY
PRID
HAM
AVEN
UE
271.8m²
368.7m²
368.8m² 309.8m² 309.9m² 369m²
269.3m²
309.8m²
305.7m²
312m²
327.7m²
369m²309.8m²309.8m²368.8m²
309.7m²
309.7m²
368.7m²309.6m²
309.6m²
309.6m²
309.6m²
309.5m²
309.5m²
309.5m²
309.5m²
309.5m²
309.5m²
412.5m²
412.5m²
332.9m²
332.9m²367.1m²
367.1m²
423.9m²
300m²
300m²
427m²
300m²2085
2092
2091
2088
2071
2079
2069
2055
2093
20802089
2090
207720822087 2086 2084 2083
2073
2078 2076
2070
2072
2058 20622056 20652057 2059 20662061 206720632060 2068
2074
2064
2081
2075
GELT STREET
10.5 10
9.1
14 10.5 10.5
10.5
10
12.5
15.6
33.6
10.5
1411.3 10.512.5 10.5 10.510.5 10.510.512.5
9.511
12.5
27.2
17.3
12.9
5.29.7
07
12.5
11.3
11.8
10.512.5 14 10.5
10
10.5 12.510.5
14.4
10.5 12.5
30
10.5 10.5
29.5
12.5
29.4
5.726
1010
10.5
26
5.7
12.5 11.3 10.5 10.5 10.510.5 10.5 10.512.5 12.510
29.4
30
30
1014
.5
29.4
29.4
30
29.5
29.4
29.4
29.4
29.4
29.5
29.5
29.5
29.5
29.5
11.2
10.21
9
31.6
29.5
29.5
10.3 29
.5
29.5
29.5
29.5
29.5
29.4
29.5
29.5
29.5
29.5
29.4
29.5
29.5
29.4
20.4 6.3
15.6
15.6
17.3 16.3
31.5
32.0
31.0
49.5
48.0
47.5
46.0
45.0
44.5
42.0
53.0 52.0
47.0 43
.0
50.5
48.5
38.5
40.5
30.5
33.0
33.5
33.0
34.0
34.5
35.5
36.0
37.0
37.5
38.0
39.0
39.5
41.0
40.0
42.5
43.5
44.0
46.5
52.5
50.0
49.0
31.0
32.5
40.5
41.0
52.0
NORTH
Project: Scale:
ALBERT PARK19-25 BOUNDARY ROAD, BOX HILL
MARKETING PLANLOTS 2055-2093
DENOTES EASEMENT TO DRAIN WATER 1.5 WIDE.DENOTES EASEMENT FOR REPAIRS 0.9m WIDEDENOTES PROPOSED CONTOURS @ 0.5m INTERVALS47.0
LEGEND(A)
(B)
DENOTES 1V:6H BATTER (MAX. 4m LONG)
DENOTES STORMWATER DRAINAGE
DENOTES RETAINING WALL (MAX. 1.5m HIGH)
DENOTES CONCEPT SYDNEY WATER SEWER
NOTE: INFORMATION SHOWN IS SUBJECT TO COUNCIL & AUTHORITY APPROVALS AND MAY CHANGE
DENOTES 1V:1H SIDE BOUNDARY BATTERFOR FUTURE DROP EDGE BEAM
Appd. Date Revision DescriptionFirstIssue Drawn
Revis
ion
JM 27/10/17PB
JMC REVISED LOT LAYOUTPB 28/03/18JMB REVISED LOT LAYOUTPB 17/11/17JMA ISSUED FOR INFORMATIONPB 27/10/17
SAD ISSUED FOR INFORMATION- 08/02/19
W: www.goldmategroup.com A: level 18, Citigroup CentreE: [email protected] 2 Park St, Sydney NSW 2000
SAE REVISED STREET NAME- 05/03/19
51.5
51.0
50.5
50.0
33.0
30.0
30.5
31.0
42.5
41.5
41.5
39.5
39.5
38.5
37.5
36.5
32.0
33.0
33.5
35.537
.0
38.0
38.5
39.5
40.0
40.5
41.5
42.0
43.0
44.0
43.5
42.5
45.5
46.547.5
46.5
43.5
44.5
44.5
45.5
47.0
46.0
47.5
48.0
49.048.5
49.0
45.5
45.0
48.0
45.0
44.5
43.0
40.5 38.0
37.5
37.0
36.0
35.5
34.5
34.0
32.5
31.5
29.0
48.5
47.0
29.5
46.5
34.0
34.5
50.0
40.5
48.0
CH 270.0
TINLINE STREET
GELT STREET
FELLING STREET
WOO
DGAT
E PA
RKW
AYW
OODG
ATE
PARK
WAY
PRID
HAM
AVEN
UE
10.5
30
.0
5.0
9.0
16
.0
10.5
30
.0
10.5
30.0
10.5
30.0
10.5
30
.0
10.7
30
.0
9.5
30
.0
10.5
30
.0
10.5
30
.0
9.5
30
.0
9.5
30.0
9.5
30
.0
10.0
30
.0
12.5
30.0
10.5
30.0
10.5
27
.5
2.5
10.5
10.5
30.0
10.5
10.5
30
.0
12.5
12.5
30
.0
10.0
10.0
30
.0
9.5
9.5
30
.0
9.5
9.5
30
.0
9.5
9.5
30.0
10.5
10.5
30
.0
10.5
10.5
30
.0
9.5
9.5
30.0
10.7
10.7
30
.0
10.5
10.5
30.0
10.5
10.5
30
.0
10.5
10.5
30
.0
10.5
10.5
30
.0
10.5
15
.0
10.0
5.0
10.5
30
.0
9.7
6
.
2
9
.8
A14.
2
19.0
12.5
27
.5
12.5
9.1
18.4 18.8
36.0
18.8
16.0
5
.
7
15.2
16
.0
A12.
0
A7.0
3.1
33.2
10.1
34.7
23.5
1
7
.
8
2096315m²
2097315m²
2098315m²
2099315m²
2100315m²
2101322m² 285m²
2102 2103315m² 315m² 285m²
2104 2105 2106285m²
2107285m² 300m²
21092108 2110375m² 315m²
2111315m²
2114315m²
2115315m²
2116374m²
2117300m²
2118285m²
2119285m²
2120285m²
2123285m²
2121315m²
2122315m²
2124322m²
2125315m²
2126315m²
2128315m²
2127315m²
2129315m²
2133330m²
2113446m²
2112344m²
2095300m²
2131340m²
2132354m²
2130424m²
2094295m²
NORTH
W: www.goldmategroup.com A: level 18, Citigroup Centre
Project: Scale:
ALBERT PARK19-25 BOUNDARY ROAD, BOX HILL
MARKETING PLANLOTS 2094-2133
0 5 10 15 20 25 30 35 40 45 50
SCALE 1:1000 (A3)SCALE 1:500 (A1)
DENOTES EASEMENT TO DRAIN WATER 1.5 WIDE.DENOTES EASEMENT FOR REPAIRS 0.9m WIDEDENOTES PROPOSED CONTOURS @ 0.5m INTERVALS47.0
LEGEND(A)
(B)
DENOTES 1V:6H BATTER (MAX. 4m LONG)
DENOTES STORMWATER DRAINAGE
DENOTES RETAINING WALL (MAX. 1.5m HIGH)
DENOTES CONCEPT SYDNEY WATER SEWER
E: [email protected] 2 Park St, Sydney NSW 2000
NOTE: INFORMATION SHOWN IS SUBJECT TO COUNCIL & AUTHORITY APPROVALS AND MAY CHANGE
DENOTES 1V:1H SIDE BOUNDARY BATTERFOR FUTURE DROP EDGE BEAM
Appd. Date Revision DescriptionFirstIssue Drawn
Revis
ion
JM 16/11/17PB
JMB REVISED LOT LAYOUTPB 28/03/18JMA ISSUED FOR INFORMATIONPB 16/11/17
SAC REVISED LOT LAYOUT- 31/01/19JMD REVISED STREET NAME- 05/03/19