GECSA Electricidad

Embed Size (px)

Citation preview

  • 7/31/2019 GECSA Electricidad

    1/8

    Electrical Engineering Projects.

    Supply of Equipment and Installation.

    Integral Solution.

  • 7/31/2019 GECSA Electricidad

    2/8

    ____________________________________________________________________________________________________

    INTRODUCTION

    GECSA ElectricalEngineering have asessential object, theproject, supply,installation and start upof the circuit of highand medium voltage insteel mills. However,having a highlyqualified staff, allows usto develop electricalprojects in the entireindustrial sector.

    Constituted in 1987, is located in northern Spain, 7 km

    from the center of Bilbao and near its international airport.GECSA covers an area of 2,400 m2.

    In GECSA electricalengineering we can developelectrical projects as part ofthe team of your generalproject or through our wholesupport system, "Turnkey",always providing theengineering, equipmentspecific to your industry, asits respective installation, inthe proper measure of yourneeds.

    To GECSA Electrical Engineering, transmit safety andtranquility is part of our reason.

  • 7/31/2019 GECSA Electricidad

    3/8

    GECSA Electrical Engineeringis able to work either newinstallations or as part ofmaintenance or renovationof facilities in operation. Ourindustry knowledge allowsus to work with agility andadapt to the requirements ofvarious industrial processes.

    ____________________________________________________________________________________________________

    Our broad portfolio ofservices allows us toprovide fast and reliableresponse to your request.With extensive experiencein arc furnaces, inductionfurnaces, electrolysisplants, etc.

    Our services include:

  • 7/31/2019 GECSA Electricidad

    4/8

    ____________________________________________________________________________________________________

    Calculation, supply andinstallation of disconnector andswitches to arc furnace.

    Measurement, analysis, studyand mitigation of energyquality problems, inparticular, harmonics andflicker.

    Design, calculation, supply andinstallation of reactive powercompensators for power factorcorrection.

  • 7/31/2019 GECSA Electricidad

    5/8

    ____________________________________________________________________________________________________

    Study, supply andinstallation of surgearresters againstovervoltage.

    General study of electricpower system of the arcfurnace.

    Calculation, supply andinstallation of reactorsto arc furnace.

  • 7/31/2019 GECSA Electricidad

    6/8

    ____________________________________________________________________________________________________

    Design, calculation,supply andinstallation ofpassive filters.

    Design, supply andinstallation of insulatedswitchgear to arcfurnace.

    Study, design, supplyand installation ofelectric power systemof the arc furnace(turnkey project).

  • 7/31/2019 GECSA Electricidad

    7/8

    ____________________________________________________________________________________________________

    Study, design, supply andinstallation of RC circuitsfor transient suppressionand surge protection.

    Staff training.

  • 7/31/2019 GECSA Electricidad

    8/8

    Calculation, supply and installation of disconnector and

    switches to arc furnace.

    Measurement, analysis, study and mitigation of energy

    quality problems, in particular, harmonics and flicker.

    Design, calculation, supply and installation of reactive

    power compensators for power factor correction.

    Study, supply and installation of surge arresters against

    overvoltage.

    General study of electric power system of the arc

    furnace.

    Calculation, supply and installation of reactors to arc

    furnace.

    Design, calculation, supply and installation of passive

    filters.Design, supply and installation of insulated switchgearto arc furnace.Study, design, supply and installation of RC circuits for

    transient suppression and surge protection.

    Study, design, supply and installation of electric power

    system of the arc furnace (turnkey project).

    Staff training.

    We are available at:

    Larrondo Kalea, 10 48180 LOIU / BIZKAIA / SPAIN

    Tel. +34 94 449 47 41 / Fax. +34 94 453 53 18

    E-mail:[email protected]