zzhhhshhs

Citation preview

  • basic functionalities for GE gas turbines, fail-safe protection with SIL3 certification, installation/commissioning, and complete documentation.

    Modernization can help to eliminate system-based failures of the legacy system as well as performance losses that were previously caused by aging effects on the field and control devices.

    Moreover, the start-up process is optimizedas requested by the customer, which can reducethe start-up time (from standstill to full-load operation) down to one third.

    The incorporation of turboset auxiliary systems such as the air/oil cooler or the H2 system and integration into the unit-level control systemfor operation and monitoring permit more efficient operational management.

    The replacement of failure-prone capillary actuators with advanced electrical servoactuators and software-based closed-loopcontrol algorithms result in improved control quality and availability.

    The entire modernization, which includes replacement of the GE systems with Siemens technology, is completed in the shortest possible time, for example during a planned turbine overhaul.

    SPPA-R3000 increases the availability of GE gas turbines e. g. in Gresik Power Station, Indonesia.

    Instrumentation, Controls & Electrical

    SPPA-R3000 Turbine Controls

    is the perfect modernization solution with comprehensive automation functions forgas and steam turbines from any vendor.

    The Task

    In addition to expensive spare parts warehousing, an increasing failure probability affecting the mechanical and electrical components utilized to control and protectGE Frame gas turbines results in decreasing availability and deteriorating operational reliability.

    The main turbine and generator components still retain a high residual lifetime. The old control and protection systems are no longerup to the task of meeting today's requirements for cost-effective operation of the turbosets.

    Our Solution

    SPPA-R3000 offers concepts that are adapted to the specific requirements of GE gas turbines of types Frame 5, Frame 6, Frame 7, and Frame 9 and have proven their worth over and over in operation.

    In addition to the control system, the modernization solution can also include vibration monitoring and analysis, electrical engineering, modernization of the hydraulic system, and field instrumentation.

    The basis is the globally leading SPPA-T3000 control system that forms the platform for automation, control and protection. It is employed for turbines, auxiliary systemsand the main control system, and permits seamless integration of all functional areasof the plant. Thanks to its scalability, it can be used not only as a stand-alone turbine solution but also for modernization of the entire plant with a uniform operating and engineering environment.

    Our service portfolio comprises everythingfrom feasibility studies to the mapping of

    Answers for energy.

    Increased Availabilityfor GE Frame Gas Turbines

    Your Benefits

    Increased availability and lifetime

    Increased operational reliability

    Increased flexibility Reduced maintenance costs

    Turbine Controls

  • Published by and copyright 2012:Siemens AG, Energy SectorFreyeslebenstrasse 191058 Erlangen, Germany

    For more information [email protected]/energy/sppar3000

    Siemens Energy, Inc.Instrumentation, Controls, & Electrical1345 Ridgeland Parkway, Suite 116Alpharetta, GA 30004, USA

    R30GT_FS_GE-Frame-Mod_e_V2-0Order No. E50001-G230-A305-X-4A00

    Printed in GermanyDispo 05401, c4bs-Nr. 7465

    Printed on elementary chlorine-free bleached paper.

    All rights reserved. Trademarks mentioned in this document arethe property of Siemens AG, its affiliates, ortheir respective owners.

    Subject to change without prior notice. The information in this document containsgeneral descriptions of the technical options available, which may not apply in all cases. The required technical options should therefore be specified in the contract.

    The solution can include:

    Control system (open-loop control, closed-loop control, protection)

    Vibration monitoring and analysis

    Electrical engineering (excitation system, synchronization, unit protection facilities)

    Hydraulic modernization

    Field instrumentation

    Execution of a feasibility study

    Conceptual design technological outliningof the task definition

    Mapping of the basic functionalities for GE gas turbines

    Functional extension to increase cost-efficiency, e.g. test functions to reduce maintenance effort

    Fail-safe protection withSIL3 certification

    Customized adaptations of the solution, e.g. modification of the operating mode

    Installation/commissioning withoptimized timing

    Before/after tests (fingerprints)

    Complete documentation

    Our service portfolio:

    Our comprehensive service portfolio ranges from studies and consulting to after-sales service and is notable for its first-rate quality management.

    Quality Management

    Offer Installation Commis-sioningTest Run

    afterMod.

    After-SalesService

    Test Run before Mod.,

    Planning,Realization

    TrainingStudies

    andConsulting

    Engineering,Tests ,

    Manufacturing

    /ColorImageDict > /JPEG2000ColorACSImageDict > /JPEG2000ColorImageDict > /AntiAliasGrayImages false /CropGrayImages true /GrayImageMinResolution 300 /GrayImageMinResolutionPolicy /OK /DownsampleGrayImages true /GrayImageDownsampleType /Bicubic /GrayImageResolution 300 /GrayImageDepth -1 /GrayImageMinDownsampleDepth 2 /GrayImageDownsampleThreshold 1.50000 /EncodeGrayImages true /GrayImageFilter /DCTEncode /AutoFilterGrayImages true /GrayImageAutoFilterStrategy /JPEG /GrayACSImageDict > /GrayImageDict > /JPEG2000GrayACSImageDict > /JPEG2000GrayImageDict > /AntiAliasMonoImages false /CropMonoImages true /MonoImageMinResolution 1200 /MonoImageMinResolutionPolicy /OK /DownsampleMonoImages true /MonoImageDownsampleType /Bicubic /MonoImageResolution 1200 /MonoImageDepth -1 /MonoImageDownsampleThreshold 1.50000 /EncodeMonoImages true /MonoImageFilter /CCITTFaxEncode /MonoImageDict > /AllowPSXObjects false /CheckCompliance [ /None ] /PDFX1aCheck false /PDFX3Check false /PDFXCompliantPDFOnly false /PDFXNoTrimBoxError true /PDFXTrimBoxToMediaBoxOffset [ 0.00000 0.00000 0.00000 0.00000 ] /PDFXSetBleedBoxToMediaBox true /PDFXBleedBoxToTrimBoxOffset [ 0.00000 0.00000 0.00000 0.00000 ] /PDFXOutputIntentProfile (None) /PDFXOutputConditionIdentifier () /PDFXOutputCondition () /PDFXRegistryName () /PDFXTrapped /False

    /CreateJDFFile false /Description > /Namespace [ (Adobe) (Common) (1.0) ] /OtherNamespaces [ > /FormElements false /GenerateStructure false /IncludeBookmarks false /IncludeHyperlinks false /IncludeInteractive false /IncludeLayers false /IncludeProfiles false /MultimediaHandling /UseObjectSettings /Namespace [ (Adobe) (CreativeSuite) (2.0) ] /PDFXOutputIntentProfileSelector /DocumentCMYK /PreserveEditing true /UntaggedCMYKHandling /LeaveUntagged /UntaggedRGBHandling /UseDocumentProfile /UseDocumentBleed false >> ]>> setdistillerparams> setpagedevice