Page 1: Gates/Y2E2 Walkthrough

Gates/Y2E2 Walkthrough

Benjamin Welle, P.E., C.E.M., LEED APPhD Student, CIFECEE Department

Stanford University

In the Field: Energy Audits and LEED

Page 2: Gates/Y2E2 Walkthrough

LEED-NC LEED-EB  Energy & Atmosphere 17 Points   Energy & Atmosphere 23 Points

Prereq 1 Fundamental Commissioning of the Building Energy Systems Required Prereq 1 Existing Building Commissioning RequiredPrereq 2 Minimum Energy Performance Required Prereq 2 Minimum Energy Performance - Energy Star 60 RequiredPrereq 3 Fundamental Refrigerant Management Required Prereq 3 Ozone Protection RequiredCredit 1 Optimize Energy Performance 1 to 10 Credit 1 Optimize Energy Performance 1 to 10  10.5% New Buildings or 3.5% Existing Building Renovations 1   Energy Star Rating - 63 1  14% New Buildings or 7% Existing Building Renovations 2   Energy Star Rating - 67 2  17.5% New Buildings or 10.5% Existing Building Renovations 3   Energy Star Rating - 71 3  21% New Buildings or 14% Existing Building Renovations 4   Energy Star Rating - 75 4  24.5% New Buildings or 17.5% Existing Building Renovations 5   Energy Star Rating - 79 5  28% New Buildings or 21% Existing Building Renovations 6   Energy Star Rating - 83 6  31.5% New Buildings or 24.5% Existing Building Renovations 7   Energy Star Rating - 87 7  35% New Buildings or 28% Existing Building Renovations 8   Energy Star Rating - 91 8  38.5% New Buildings or 31.5% Existing Building Renovations 9   Energy Star Rating - 95 9  42% New Buildings or 35% Existing Building Renovations 10   Energy Star Rating - 99 10Credit 2 On-Site Renewable Energy 1 to 3 Credit 2.1 Renewable Energy - On-site 3% / Off-site 15% 1

2.5% Renewable Energy 1 Credit 2.2 Renewable Energy - On-site 6% / Off-site 30% 17.5% Renewable Energy 2 Credit 2.3 Renewable Energy - On-site 9% / Off-site 45% 112.5% Renewable Energy 3 Credit 2.4 Renewable Energy - On-site 12% / Off-site 60% 1

Credit 3 Enhanced Commissioning 1 Credit 3.1 Building Operation & Maintenance - Staff Education 1Credit 4 Enhanced Refrigerant Management 1 Credit 3.2 Building Operation & Maintenance - Building Systems Maintenance 1Credit 5 Measurement & Verification 1 Credit 3.3 Building Operation & Maintenance - Building Systems Monitoring 1Credit 6 Green Power 1 Credit 4 Additional Ozone Protection 1

Credit 5.1 Performance Measurement - Enhanced Metering (4 specific actions) 1Credit 5.2 Performance Measurement - Enhanced Metering (8 specific actions) 1Credit 5.3 Performance Measurement - Enhanced Metering (12 specific actions) 1Credit 5.4 Performance Measurement - Emission Reduction Reporting 1

  Indoor Environmental Quality 15 Points   Indoor Environmental Quality 22 Points

Prereq 1 Minimum IAQ Performance Required Prereq 1 Outside Air Introduction & Exhaust Systems RequiredPrereq 2 Environmental Tobacco Smoke (ETS) Control Required Prereq 2 Environmental Tobacco Smoke (ETS) Control RequiredCredit 1 Outdoor Air Delivery Monitoring 1 Prereq 3 Asbestos Removal or Encapsulation RequiredCredit 2 Increased Ventilation 1 Prereq 4 PCB Removal RequiredCredit 3.1 Construction IAQ Management Plan, During Construction 1 Credit 1 Outside Air Delivery Monitoring 1Credit 3.2 Construction IAQ Management Plan, Before Occupancy 1 Credit 2 Increased Ventilation 1Credit 4.1 Low-Emitting Materials, Adhesives & Sealants 1 Credit 3 Construction IAQ Management Plan 1Credit 4.2 Low-Emitting Materials, Paints & Coatings 1 Credit 4.1 Documenting Productivity Impacts - Absenteeism & Healthcare Cost Impacts 1Credit 4.3 Low-Emitting Materials, Carpet Systems 1 Credit 4.2 Documenting Productivity Impacts - Other Productivity Impacts 1Credit 4.4 Low-Emitting Materials, Composite Wood & Agrifiber Products 1 Credit 5.1 Indoor Chemical & Pollutant Source Control - Reduce Particulates in Air System 1Credit 5 Indoor Chemical & Pollutant Source Control 1 Credit 5.2 Indoor Chemical & Pollutant Source Control - Isolation of High Volume Copy/Print/Fax Room 1Credit 6.1 Controllability of Systems, Lighting 1 Credit 6.1 Controllability of Systems - Lighting 1Credit 6.2 Controllability of Systems, Thermal Comfort 1 Credit 6.2 Controllability of Systems - Temperature & Ventilation 1Credit 7.1 Thermal Comfort, Design 1 Credit 7.1 Thermal Comfort - Compliance 1Credit 7.2 Thermal Comfort, Verification 1 Credit 7.2 Thermal Comfort - Permanent Monitoring System 1Credit 8.1 Daylight & Views, Daylight 75% of Spaces 1 Credit 8.1 Daylight & Views - Daylight for 50% of Spaces 1Credit 8.2 Daylight & Views, Views for 90% of Spaces 1 Credit 8.2 Daylight & Views - Daylight for 75% of Spaces 1

Credit 8.3 Daylight & Views - Views for 45% of Spaces 1Credit 8.4 Daylight & Views - Views for 90% of Spaces 1Credit 9 Contemporary IAQ Practice 1Credit 10.1 Green Cleaning - Entryway Systems 1Credit 10.2 Green Cleaning - Isolation of Janitorial Closets 1Credit 10.3 Green Cleaning - Low Environmental Impact Cleaning Policy 1Credit 10.4 Green Cleaning - Low Environmental Impact Pest Management Policy 1Credit 10.5 Green Cleaning - Low Environmental Impact Pest Management Policy 1Credit 10.6 Green Cleaning - Low Environmental Impact Cleaning Equipment Policy 1

Relevant LEED Credits-New Construction and Existing Building

Page 3: Gates/Y2E2 Walkthrough

HVAC Fundamentals – Chillers and Boilers NC-EAPr1, EAPr2, EACr1, EACr3, EACr5 EB- EAPr1, EAPr2, EACr1, EACr3.2, EACr3.3, EACr5.1

• Chillers make cold water and boilers make hot water.

• The chiller is typically the most energy-intensive piece of equipment in the plant as well as the most wasteful.

• Most control sequences are not optimized.

• Huge saving potential!

Chiller

Boiler

Refrigeration Cycle

Page 4: Gates/Y2E2 Walkthrough

HVAC Fundamentals – Pumps

Pump Curve

Pump Curve vs. System Curve

Centrifugal Pump

Pump “Laws”

• Pumps move the CHW and HW throughout the building (via pipes) by converting electrical energy to pressure energy.

• Most pumps are constant speed.

• Pump “Laws”- The power the pump consumes varies (theoretically) by a cubed relationship to the flow. Actually, it varies to the 2.7 power.

NC-EAPr1, EAPr2, EACr1, EACr3, EACr5EB- EAPr2, EAPr2, EACr1, EACr3.2, EACr3.3, EACr5.1

Page 5: Gates/Y2E2 Walkthrough

HVAC Fundamentals – Fans

• Fans move air throughout the building (via ducts) by converting electrical energy to pressure energy.

• Most fans are constant speed or 2-speed. Flow is regulated by either inlet guide vanes, discharge dampers, or variable-frequency drives. The latter is the most efficient.

• Fan “Laws”- The power the pump consumes varies (theoretically) by a cubed relationship to the airflow. Actually, it varies to the 2.7 power.

Fan “Laws”

Part-Load Fan Eff.

Typical AHU

Typical Centrifugal

Fan

NC-EAPr1, EAPr2, EACr1, EACr3, EACr5EB- EAPr2, EAPr2, EACr1, EACr3.2, EACr3.3, EACr5.1

Page 6: Gates/Y2E2 Walkthrough

HVAC Fundamentals – VAV Boxes, Diffusers and Cooling Towers

• VAV boxes control the volume of air supplied to a space and perimeter VAV boxes frequently have reheat.

• Diffuser performance is extremely important and is quite often designed poorly (dump, Coanda effect, short-circuiting)

•Cooling towers reject the heat removed from the building and created by the chiller compressor. Most fans are constant speed or 2-speed. In most cases, the cooling tower should have a VSD.

NC-EAPr1, EAPr2, EACr1, EACr3, EACr5, IEQPr1, IEQCr6.2, IEQCr7.1EB- EAPr2, EAPr2, EACr1, EACr3.2, EACr3.3, EACr5.1, IEQCr2, IEQCr6.2, IEQCr7.1, IEQCr7.2

Page 7: Gates/Y2E2 Walkthrough

HVAC Fundamentals – Water-side Systems

Central plant water-side distribution systems vary widely. Below are two of the most common types of systems. Variable-secondary systems are the most common, and are the most reliable. However, they don’t maximize the energy performance at part load conditions. Variable-primary systems are the most efficient type of system.

Primary-Secondary

Variable-Primary

NC-EAPr1, EAPr2, EACr1, EACr3, EACr5, IEQCr7.1EB- EAPr2, EAPr2, EACr1, EACr3.2, EACr3.3, EACr5.1, IEQCr2, IEQCr6.2, IEQCr7.1, IEQCr7.2

Page 8: Gates/Y2E2 Walkthrough

HVAC Fundamentals- Air-Side Systems

• The basic air-side distribution system is shown to the right, and is frequently referred to as the ASHRAE “H”.

• The outside air dampers frequently have economizer controls, which allows for free cooling.

• Many systems do not required return fans.

• Fan energy is minimized by good duct design.

ASHRAE “H”

NC-EAPr1, EAPr2, EACr1, EACr3, EACr5, IEQPr1, IEQCr1, IEQCr2, IEQCr6.2, IEQCr7.1EB- EAPr1, EAPr2, EACr1, EACr3.2, EACr3.3, EACr5.1, IEQPr1, IEQCr2, IEQCr3, IEQCr6.2, IEQCr7.1, IEQCr7.2

Page 9: Gates/Y2E2 Walkthrough

Air

Qsensible(Btu/hr) = 1.08 x CFM x ∆T Qlatent(Btu/hr) = 0.67 x CFM x ∆G

Water

Qsensible(Btu/hr) = 500 x GPM x ∆T

HVAC Fundamentals – Sensible and Latent Loads

Change in Temperature (°F)

Grains of moisture (7000 Gr/lb of water)

Airflow

Water Flow

NC-EAPr1, EAPr2, EACr1, EACr3, EACr5, IEQPr1, IEQCr1, IEQCr2, IEQCr6.2, IEQCr7.1EB- EAPr1, EAPr2, EACr1, EACr3.2, EACr3.3, EACr5.1, IEQPr1, IEQCr2, IEQCr6.2, IEQCr7.1, IEQCr7.2

Page 10: Gates/Y2E2 Walkthrough

HVAC Fundamentals – Psychrometrics

Air psychrometrics is the study of moist and humid air and the change in air conditions. A typical HVAC process is shown below.

NC-EAPr1, EAPr2, EACr1, EACr3, EACr5, IEQPr1, IEQCr1, IEQCr2, IEQCr6.2, IEQCr7.1EB- EAPr1, EAPr2, EACr1, EACr3.2, EACr3.3, EACr5.1, IEQPr1, IEQCr2, IEQCr6.2, IEQCr7.1, IEQCr7.2

Page 11: Gates/Y2E2 Walkthrough

HVAC Measures

General HVAC Measures (Existing):• CHW/HW rest• Schedule modification/setback• Install VFDs• Change delta-Ts• Install BAS/EMS/DDC• Replace old motors• Install economizers• Reduce condenser water temperature• Insulate piping and ductwork

General HVAC Measures (New):•All above EEMs• High-efficiency chillers (with VFD) and condensing boilers• Minimize duct and pipe runs

NC-EAPr1, EAPr2, EACr1, EACr3, EACr5, IEQPr1, IEQCr1, IEQCr2, IEQCr6.2, IEQCr7.1EB- EAPr1, EAPr2, EACr1, EACr3.2, EACr3.3, EACr5.1, IEQPr1, IEQCr1, IEQCr2, IEQCr6.2, IEQCr7.1, IEQCr7.2

Page 12: Gates/Y2E2 Walkthrough

CHWR

CHWS

RFRAT

FILTERCOOLING

COIL

COOLINGVALVE

ECONOMIZERDAMPER

EXHAUSTDAMPER

RETURNDAMPER

OUTSIDEDAMPER

SF

MAT

OATCOOLING

COIL

Gates HVAC System

Page 13: Gates/Y2E2 Walkthrough

Y2E2 HVAC Narrative-Cooling

• Much of Y2E2 is naturally ventilated. At night, the building will open certain windows and atrium louvers to expel the day’s heat and pre-cool itself.

• Occupants in north and east perimeter spaces should open their windows manually before leaving for the evening and close their windows upon arrival the next day, using the ceiling fan for circulation.

• Occupants in spaces along the south and west facades should also open their windows at night and close their windows in the mornings. These spaces have also been outfitted with active beams for additional cooling for use as needed. These are individually controlled by the thermostats on the wall.

• Interior spaces are also cooled with active beams, controlled by the wall thermostat.

• The basement labs are conventionally cooled and can controlled at the thermostats.

Page 14: Gates/Y2E2 Walkthrough

Y2E2 HVAC Narrative-Heating

• North and east perimeter spaces have baseboard radiators controlled by individual thermostats on the walls.

• South and west perimeter spaces are heated by the active beams. Control is also provided at the wall thermostat

• The basement labs are heated conventionally and can be controlled via the thermostats.

• Spaces in the interior of Y2E2 rely on the rest of the building for heat and don’t currently have heat sources of their own outside of people and electronic equipment loads.

Page 15: Gates/Y2E2 Walkthrough

Y2E2 Building Finish Narrative

• The exposed concrete is the finished floor. Not only does it save tons of synthetic materials from being manufactured and transported, but it also contributes to the overall thermal comfort of the building.

• Offices along the south side of Y2E2 are outfitted with sun shades.

• Polycarbonate panels and walls have been installed in order to share daylight with the interior of the building.

Page 16: Gates/Y2E2 Walkthrough

Y2E2 Lighting & Fan Narrative

• Most of the lighting on the upper three floors of Y2E2 is controlled by motion detectors and photocells.

• In private offices, the motion detectors are located at the wall switch. • Ceiling fans are also controlled by the wall-mounted motion detectors.

Page 17: Gates/Y2E2 Walkthrough

Y2E2- HVAC Diagram

Page 18: Gates/Y2E2 Walkthrough

Y2E2- Chilled Water Piping Diagram (AHU and FC)

Page 19: Gates/Y2E2 Walkthrough

Y2E2- Chilled Water Piping Diagram (Beams)

Page 20: Gates/Y2E2 Walkthrough

Y2E2- Ventilation Diagram

Page 21: Gates/Y2E2 Walkthrough

Building Commissioning

• Building commissioning is one of the highest value-added energy efficiency measures for existing buildings or new construction, if not the highest.

• Even in newly designed buildings there remains a HUGE disconnect between the building design/construction and maintenance and operation.

• Improper use of the building’s energy management system not only negates the benefits of an energy-efficient design, it can also cause energy consumption GREATER than a properly operating building with outdated pneumatic controls. Many O&M managers simply have no idea what their system is doing.

• “If you can’t figure it out, just disconnect it” mentally pervasive throughout the building industry.

• Additional Commissioning LEED credit is usually pursued (and rightfully so).

NC-EAPr1, EAPr2, EACr1, EACr3, EACr5, IEQPr1, IEQCr1, IEQCr2, IEQCr6.2, IEQCr7.1EB- EAPr1, EAPr2, EACr1, EACr3.2, EACr3.3, EACr5.1, IEQPr1, IEQCr1, IEQCr2, IEQCr3, IEQCr6.2, IEQCr7.1, IEQCr7.2

Page 22: Gates/Y2E2 Walkthrough

Lighting- Background

• T12s vs. T8s vs. T5s- T8s are typically best, T5s if there are high operating hours, though costs are decreasing.

• Incandescent vs. compact fluorescent lighting (CFL)- Always better to replace incandescent bulbs with CFLs. Color, rendering, and socket compatibility not much of an issue anymore. Retail is the toughest sell. You can frequently buy them for 30-40% retail price. Payback is negligible (don’t forget the HVAC savings!).

• LEDs- You see these in exit signs, stoplights, and many display signs. This technology is rapidly developing and may soon replace many fluorescent applications.

• Lighting controls- Occupancy sensors, dimmable ballasts, and photosensors are widely applicable. Very short payback.

• This is the low-hanging fruit.

NC-EAPr1, EAPr2, EACr1, EACr3, EACr5, IEQCr6.1EB- EAPr1, EAPr2, EACr1, EACr3.2, EACr3.3, EACr5.1, IEQCr6.1, IEQCr8

Page 23: Gates/Y2E2 Walkthrough

Lighting- Measures

General Measures (Existing):•Replace T12s with T8s or T5s• Replace Inc. with CFLs•Install LED exit signs• Install occupancy sensors• Install photosensors and dimmable ballasts for perimeter zones•De-lamp and install specular reflectors•Install photocells or timeclocks on outdoor lighting

General Measures (New):• All above EEMs• Optimize lighting design/indirect lighting• Optimize natural daylighting

Along with building commissioning, lighting retrofits hold the greatest energy efficiency potential for existing buildings worldwide.

NC-EAPr1, EAPr2, EACr1, EACr3, EACr5, IEQCr6.1EB- EAPr1, EAPr2, EACr1, EACr3.2, EACr3.3, EACr5.1, IEQCr6.1, IEQCr8

Page 24: Gates/Y2E2 Walkthrough

Envelope- Windows

• Windows are the most problematic envelope component of existing buildings.

• Many people are quick to say “install low-e double-pane windows” as a retrofit, but it rarely pays back. Window film is a much more viable option (south facing facades). In extreme weather locations, window replacement may be justified.

• For new buildings, spectrally selective coatings, low-e being one type, are very desirable. It allow sunlight to pass through while minimizing IR heat gain. Coated glass typically better than tinted glass.

• Avoid aluminum frames or ensure exceptional thermal breaks.

How much difference can a window film make on an existing building?

NC-EAPr1, EAPr2, EACr1, IEQCr6.1, IEACr7.1, IEQCr8EB- EAPr1, EAPr2, EACr1, EACr3.2, IEQCr6.2, IEQCr7.1, IEQCr8

Page 25: Gates/Y2E2 Walkthrough

Envelope- Measures

General Measures (Existing):• Add insulation• Install efficient windows (double-pane, low-e)•Install window film

General Measures (New):• All above EEMs• Optimize site orientation, window placement (daylighting)• Optimize building footprint• Super-insulate (downsize or eliminate HVAC system)• Install air/vapor barriers• Minimize thermal breaks• Design for natural ventilation (pure or hybrid)

NC-EAPr1, EAPr2, EACr1, IEQPr1, IEQCr7.1, IEQCr8EB- EAPr1, EAPr2, EACr1, EACr3.2, IEQCr6.2, IEQCr7.1, IEQCr8

Page 26: Gates/Y2E2 Walkthrough

Energy Code Impact on LEED Credits

• Title 24 aggregates gas and electricity use (Btu/ft2). ASHRAE 90.1-1999 used the Energy Cost Budget method ($/ft2). LEED takes into account the relative cost of fuels, which means the most desirable credits vary by region, based upon the relative gas and electricity prices.

• LEED 2.2 is based on ASHRAE 90.1-2004, which did not regulate process and receptacle loads. Title 24-2005 is no longer considered more stringent than 90.1-2004, so the requirements are the same. 90.1-2004 uses a Performance Rating Method (PRM), which again uses $$$$ as the benchmark. It includes process and receptacle loads, elevators, site lighting and non-conditioned lighting.

• 25% of baseline is plug load, and is fixed, making it more difficult to achieve LEED points, though there are work-arounds.

• Any good engineer will always used the performance-based compliance method, not the prescriptive.

NC-EAPr1, EAPr2, EACr1, EACr3, IEQPr1, IEQCr7.1, IEQCr8EB- EAPr1, EAPr2, EACr1, IEQPr1, IEQCr2, IEQCr7.1, IEQCr8

Page 27: Gates/Y2E2 Walkthrough

Thermal comfort is physiological and psychological (subjective). A well-designed building is only acceptable to 80% of the occupants (by definition). ASHRAE 55 governs thermal comfort.

Major Variables Influencing Thermal Comfort:

1. Air temperature 2. Activity level3. Humidity 4. Clothing5. Air Velocity6. Mean radiant temperature

Thermal Comfort

Comfort Zone

Thermal comfort is a major problem in buildings built prior to 1995. Can you guess why?

NC-EAPr1, EACr3, EACr5, IEQPr1, IEQCr1, IEQCr2, IEQCr6.2, IEQCr7.1, IEQCr7.2EB- EAPr1, EACr3.2, EACr3.3, EACr5.1, IEQPr1, IEQCr1, IEQCr2, IEQCr4, IEQCr6.2, IEQCr7.1, IEQCr7.2

Page 28: Gates/Y2E2 Walkthrough

Daylighting

• “Daylight and Views” credits difficult to achieve.

• Synergy between footprint reduction and D&V credits. Tradeoff with construction costs, zoning requirements, and thermal performance of the building.

• Several spectrally selective coatings reduce visible sunlight significantly.

• Difficult to incorporate into existing buildings. What’s there is what’s there typically. Controls can be installed to optimize lighting.

NC-EAPr1, EAPr2, EACr1, EACr3, EACr5, IEQPr1, IEQCr6.1, IEQCr8EB- EAPr1, EAPr2, EQCr1, EACr3.3, EACr5.1, IEQCr4, IEQCr6.1, IEQ8

Page 29: Gates/Y2E2 Walkthrough

Indoor Air Quality- Energy Conservation and IAQ

• Discomfort is one of the key risk factors for indoor air quality complaints.

• The cost of comfort control for the average building (i.e. heating, cooling and ventilating) is $2-$5/square foot/year.

• The cost of labor for the average building is $200-$300/square foot/year.

• It is not uncommon that comfort is sacrificed for energy conservation- but this may not make very good economic sense.

NC-EAPr1, EAPr2, EACr1, EACr3, EACr5, IEQPr1, IEQCr1, IEQCr2EB- EAPr1, EAPr2, EACr1, EACr3.2, EACr3.3, EACr5.1, IEQPr1, IEQCr1, IEQCr2, IEQCr4, IEQCr9

Page 30: Gates/Y2E2 Walkthrough

Indoor Air Quality- Common Features in IAQ Complaint Buildings

• New building or recently remodeled (6 months of off-gassing)

• Evidence of water intrusion or reports of water/excessive moisture in occupied spaces

• Significant outdoor pollutants entrained into the occupied spaces

• Limited (or no) outdoor air supplied to the occupied spaces

• Reports of re-occurring discomfort complaints

NC-EAPr1, EAPr2, EACr1, EACr3, EACr5, IEQPr1, IEQCr1, IEQCr2EB- EAPr1, EACr3.2, EACr3.3, EACr5.1, IEQPr1, IEQCr1, IEQCr2, IEQCr3, IEQCr4

Page 31: Gates/Y2E2 Walkthrough

Indoor Air Quality- Potential Risks to Building Occupants and Building Owners

To employers:

• Health and comfort complaints leading to concern about building safety, as well as disharmony and distrust• Increased absenteeism• Loss of productivity• Worker compensation claims• Investigating and resolving the complaints

To building owners:

• The process of responding to and resolving the complaints• Disharmony with the tenant, and possible loss of tenant• The possible stigma of a “sick” building• Stress on building management and facilities personnel• Potential for tort liability claims and lawsuits

NC-EAPr1, EAPr2, EACr1, EACr3, EACr5, IEQPr1, IEQCr1, IEQCr2EB- EAPr1, EACr3.2, EACr3.3, EACr5.1, IEQPr1, IEQCr1, IEQCr2, IEQCr3, IEQCr4, IEQCr9

Page 32: Gates/Y2E2 Walkthrough

Indoor Air Quality- Categories of Indoor Health Complaints

• Common health complaints reported by building occupants:- Sick Building Syndrome (SBS)- Building Related Illnesses (BRI)

• Reports of indoor air contaminants (e.g. odors, chemicals, dust on surfaces, appearance of mold stains)

• Reports of uncomfortable conditions, such as uncomfortable temperatures, drafts, stuffy conditions, bad odors, high or low humidity

NC-EAPr1, EAPr2, EACr1, EACr3, EACr5, IEQPr1, IEQCr1, IEQCr2EB- EAPr1, EACr3.2, EACr3.3, EACr5.1, IEQPr1, IEQCr1, IEQCr2, IEQCr3, IEQCr4, IEQCr9

Page 33: Gates/Y2E2 Walkthrough

Indoor Air Quality- Sick Building Syndrome

Symptoms:

• Characterized as a cluster of common complaints.• Common features include symptoms only experienced after some period of time in the building, typically daily, on some days worse than others.• General complaints are headache, fatigue, and sleepiness.• Mucus membrane complaints are for the eye, nose, throat irritation, nasal blockage, congestion, sinus complaints, hoarse voice, skin discomfort, and breathing difficulties.• Symptoms are usually subjective, with no or limited clinical signs.• Not an uncommon type of complaint pattern, with some speculation that perhaps 50% of all buildings will be reported with such occupant complaints during their lifetime.

Causes (speculated):

• Volatile Organic Compounds (VOCs), e.g. solvent vapors, from building materials, furnishings and fixtures off-gassing these chemicals.• Inadequate outdoor air supply, which allow pollutants to accumulate.• Microorganisms such as fungal spores• Perception or belief that there is something wrong with the building.

Common characteristics of SBS buildings:

• More common in new or recently remodeled buildings (within the last five years).• Energy efficient designs, with restricted OA and no operable windows.• Comfort complaints usually accompany health complaints.• Women report health and discomfort complaints at twice the rate that men report. This is observed when other factors are controlled (salary, prevalence of women/men in the space, position within the organization).

NC-EAPr1, EAPr2, EACr1, EACr3, EACr5, IEQPr1, IEQCr1, IEQCr2EB- EAPr1, EACr3.2, EACr3.3, EACr5.1, IEQPr1, IEQCr1, IEQCr2, IEQCr3, IEQCr4, IEQCr9

Page 34: Gates/Y2E2 Walkthrough

Indoor Air Quality- Building Related Illnesses

• These are diagnosable illnesses usually with identifiable environmental causes. Some are serious public health issues.

• Examples include Legionnaires disease, hypersensitivity pneumonitis, and allergic rhinitis.

• The causes are the presence of biological agents frequently associated with improper treatment systems, water intrusion and infiltration.

• True BRIs are rare as compared to SBS complaints.

NC-EAPr1, EAPr2, EACr1, EACr3, EACr5, IEQPr1, IEQCr1, IEQCr2EB- EAPr1, EACr3.2, EACr3.3, EACr5.1, IEQPr1, IEQCr1, IEQCr2, IEQCr3, IEQCr4, IEQCr9

Page 35: Gates/Y2E2 Walkthrough

General Measures (Existing):• Enhanced maintenance program• Increase OA• Install Demand Controlled Ventilation (DCV)• Clean ducts (or replace)• Provide local thermal and lighting controls• Adjust air velocity and RH• Install DDC EMS• Re-zone the space

General Measures (New):• All above EEMs• Design for natural ventilation (careful with this one)• Use low-emitting materials• Good construction IAQ management plan

Thermal Comfort/IAQ MeasuresNC-EAPr1, EAPr2, EACr1, EACr3, EACr5, IEQPr1, IEQCr1, IEQCr2, IEQCr3, IEQCr4, IEQCr6.2, IEQCr7.1, IEQCr7.2, IEQCr8EB- EAPr1, EAPr2, EACr1, EACr3.2, EACr3.3, EACr5.1, IEQPr1, IEQCr1, IEQCr2, IEQCr3, IEQCr4, IEQCr6.2, IEQCr7, IEQCr8, IEQCr9