Page 1: Gas turbine operation methods during Wobbie index of fuel gas

Gas turbine operation methods during

Wobbie index of fuel gas change

without fuel gas nozzles modification!

CHARCRIST KUHAKARN!

ELCTRICITY GENERATING AUTHORITY OF THAILAND!

1 !

Page 2: Gas turbine operation methods during Wobbie index of fuel gas

2 !

Contents!1.  Location and structure of the power plant

and fuel gas characteristic •  Power plant location •  Power plant structure

2.  Fuel gas characteristic •  Before fuel gas change •  After fuel gas change

3.  MHI Gas turbine operation (When fuel gas changes.) •  Principle of Dry Low NOX combustion •  Tuning method for Dry Low NOX combustion •  Operation method when fuel gas changed

4.  Result 5.  Other gas turbine operation (When fuel gas changes.) 6.  Conclusion

Page 3: Gas turbine operation methods during Wobbie index of fuel gas

3 !

The effect of fuel gas change

without fuel gas nozzle

modification. !

The effect of fuel gas change!

Fuel gas was not appropriated with combustion part. 1.  Combustion will not stable.

Gas turbine will trip. 2.  Hot gas part may be damaged. !

Page 4: Gas turbine operation methods during Wobbie index of fuel gas

1. Location and structure of the power plant !

4 !

South Bangkok Power plant, Samutprakan

Power plant Location

Page 5: Gas turbine operation methods during Wobbie index of fuel gas

5 !Power plant structure: Combined cycle power plant

Gas turbine 2 units ! HRSG 2 units ! Steam turbine 1 unit!

2 Gas turbines per 1 Steam turbine (Multi shaft combined cycle power plant!

Structure of combined cycle power plant !

1. Location and structure of the power plant !

Page 6: Gas turbine operation methods during Wobbie index of fuel gas

Gas turbine at south Bangkok power plant block III •  Manufacturer: MHI (Mitsubishi Heavy Industries) •  Combustion: Dry Low NOX combustion

6 !

1. Location and structure of the power plant !

Page 7: Gas turbine operation methods during Wobbie index of fuel gas

7 !

!

!

! Fuel gas heating value

-  Before: 950 – 1,051 Btu/scf

-  After: 1,030 – 1,051 Btu/scf

-  Future: 1,030 – 1,220 Btu/scf

2. Fuel gas characteristic !

Before

Future

After (New fuel gas)

Page 8: Gas turbine operation methods during Wobbie index of fuel gas

8 !

2. Fuel gas characteristic !

Fuel gas heating value of South Bangkok power plant (BTU/SCF)!

(Before fuel gas change)!

Page 9: Gas turbine operation methods during Wobbie index of fuel gas

Gas from West side!

9 !

Gas from East side!

Mixing point!

South Bangkok power plant

block III !

2. Location and structure of the power plant !

Page 10: Gas turbine operation methods during Wobbie index of fuel gas

3. MHI Gas turbine operation !

Dry Low NOX combustion principle

Detail Diffusion Combustion

Premixed combustion

Combustion temperature High Low Stable region Large Small Oxides of Nitrogen (NOX) High Low

Combustion Tuning : Diffusion & Premixed combustion

•  Stable combustion (Combustion Fluctuation Limits)

•  Low Oxides of Nitrogen (NOX) **Stable region at high load is smaller stable region at low load.** !

10 !

Page 11: Gas turbine operation methods during Wobbie index of fuel gas

3. MHI Gas turbine operation !

Dry Low NOX combustion principle

11 !

Combustion Principle!

Heat !

Fuel ! Air!Combustion !

Page 12: Gas turbine operation methods during Wobbie index of fuel gas

SBK

-C31

&

SBK

-C32

12 !

Combustion tuning •  Fuel

•  Main Nozzle •  Pilot Nozzle (Pilot Ratio) (PL Bias) •  Top Hat Nozzle (Top Hat Ratio) (TH_Bias)

•  Air •  Air bypass valve (BV_Bias)

3. MHI Gas turbine operation !

Page 13: Gas turbine operation methods during Wobbie index of fuel gas

3. MHI Gas turbine operation !

Operation preparation for combustion tuning

13 !

Page 14: Gas turbine operation methods during Wobbie index of fuel gas

4. Result!

Gas turbine unit 31 swing Load Test!

14 !

NOX Limits

Page 15: Gas turbine operation methods during Wobbie index of fuel gas

4. Result!

15 !

Combustion Fluctuation limits

Combustion Fluctuation limits

Page 16: Gas turbine operation methods during Wobbie index of fuel gas

4. Result!

16 !

Gas turbine unit 32 swing Load Test!

NOX Limits

Page 17: Gas turbine operation methods during Wobbie index of fuel gas

4. Result!

17 !

Combustion Fluctuation limits

Combustion Fluctuation limits

Page 18: Gas turbine operation methods during Wobbie index of fuel gas

5. Other gas turbine operation !

North Bangkok Power plant, Nonthaburi!

18 !

Page 19: Gas turbine operation methods during Wobbie index of fuel gas

5. Other gas turbine operation !

19 !

Combustion of GE gas turbine at North Bangkok Power plant block I, Nonthaburi!

DLN 2.0+ Combustion chamber (Before fuel gas change) !

DLN 2.6+ Combustion chamber (Before fuel gas change) !

Page 20: Gas turbine operation methods during Wobbie index of fuel gas

5. Other gas turbine operation !

20 !

Combustion of ALSTOM gas turbine at North Bangkok Power plant block II, Nonthaburi!

Page 21: Gas turbine operation methods during Wobbie index of fuel gas

6. Conclusion !

Gas from West side!

Gas from East side!

Mixing point!

South Bangkok power plant

block III !

21 !

Mixing point!

South Bangkok power plant

block III !

Page 22: Gas turbine operation methods during Wobbie index of fuel gas

980.00

1,000.00

1,020.00

1,040.00

1,060.00

1,080.00

0:00

0:

55

1:50

2:

45

3:40

4:

35

5:30

6:

20

7:15

8:

10

9:05

10

:00

10:5

5 11

:50

12:4

5 13

:40

14:3

5 15

:30

16:2

0 17

:15

18:1

0 19

:05

20:0

0 20

:55

21:5

0 22

:45

23:4

0

Fuel gas WI of South Bangkok power plant during tuning

SBMR NBMR 22 !

Designed: 1,030 – 1,051 Btu/scf

Time delay of Fuel gas change from Mixing point ≈ 4 hours

4 hours

Actual: 990 – 1,051 Btu/scf

6. Conclusion !

Page 23: Gas turbine operation methods during Wobbie index of fuel gas

23 !

1.  Check Fuel gas from mixing point at least every 2 hours !

to check the change of fuel gas. !

(Traveling time of Fuel gas at mixing point to South Bangkok power plant is 4 hours) !

2.  If WI > 1,051 Btu/scf !

Gas turbine’s load should be decreased to Min generation (140 MW) !

To protect gas turbine from Run back or Trip !

!

!

6. Conclusion !