5
Tom Pogson SUBJECT Nominal 123MW Dual Fuel Gas Turbine Dear Tom, With regards to your inquiry on power plant, present the provision of two Brand New PG9171-E123MW/50HZ Dual Fuel Turbines, unused and is currently in preservation and storage. These units are immediately available and subject to prior sale and are currently being offered internationally. Sook Sanan

Dual Fuel Gas Turbine[1]

Embed Size (px)

Citation preview

Page 1: Dual Fuel Gas Turbine[1]

Tom Pogson

SUBJECT – Nominal 123MW Dual Fuel Gas Turbine

Dear Tom,

With regards to your inquiry on power plant, present the provision of two Brand New

PG9171-E123MW/50HZ Dual Fuel Turbines, unused and is currently in preservation

and storage.

These units are immediately available and subject to prior sale and are currently being

offered internationally.

Sook Sanan

Page 2: Dual Fuel Gas Turbine[1]

Basic description and supply of the PG9171-E 123MW/50HZ Dual Fuel Turbines

Brand New Generator sets (2008 year of build).

Designed for high Ambient Temperatures

Package: 106 Ft Long 36 Ft High (Air Intake) X 10 Ft Wide Plus Electrical House &

Cooler Assembly.

Dimansions: Weights:

Gas Turbine: 12.66 m x 5.03 m x 5.05 m 202 tons

Accessory Compartment: 8.45 m x 3.45 m x 4.10 m 43.5 tons

Exhaust Plenum: 5.35 m x 3.45 m x 3.94 m 22.5 tons

Exhaust Accessories: 5.55 m x 3.65 m x 0.76 m 6.4 tons

Load Compartment: 5.30 m x 1.90 m x 1.05 m 4.6 tons

Installation and Commissioning are not included since I believe the final configuration

will be barge mounted. Budgetary price per unit is around US$ 38 million.

Page 3: Dual Fuel Gas Turbine[1]
Page 4: Dual Fuel Gas Turbine[1]
Page 5: Dual Fuel Gas Turbine[1]