Gas turbine efficiency and power upgrade Vuosaari power plant 2011
Siemens Energy Day, December 15,
Dipl. Eng. Christoph Sorgenfrey E S SF REU 242
Christoph Sorgenfrey E S SF REU 242 Marketing Service Agreements / GT Mods
Energy Day 2011, Helsinki
Part 1:
Gas Turbine Modernization V94.2 / SGT5-2000E
Christoph Sorgenfrey
Marketing Service Agreements/GT Mods/LTE E-
class GT
Contents
Market Challenges & Modernization Potential
SGT5 2000E Power Plants 4
Si3D Benefits 6
Advantages of Power Limit Increase (PLI) 9
Vuosaari Major Outage 2011 on GT5 12
Christoph Sorgenfrey E S SF REU 242 Marketing Service Agreements / GT Mods
Market Challenges for
V94.2 / SGT5-2000E Combined Cycle Power Plants
High Efficiency
High Availability High Power Output
• Fuel price
• Fuel consumption
• “Green MW”
• Electricity price
• Baseload/
Peak power
• Hot gas parts life
• Refurbishment
• Maintenance intervals
High Flexibility
• Start up capability
• Dual Fuel use
• Grid requirements
• Min Load decrease
Increase
operating range
Low Emission
• NOX & CO limits
• CO2 „trading“
Christoph Sorgenfrey E S SF REU 242 Marketing Service Agreements / GT Mods
Example for Modernization Potential of
V94.2 / SGT5-2000E Combined Cycle Power Plants
Modernization potential: *
Up to 9% (40 MW) power output
increase
Up to 11% (50 MW) additional
power output increase with WetC
1% points or more
combined cycle efficiency
improvement
Significant operating cost reduction
Cutting NOX & CO2 emissions
* Subject to specific technical plant evaluation,
expected values with test tolerance @ ISO condition.
Reference: 15 year old CCPP (2x1) rated at 450 MW
Christoph Sorgenfrey E S SF REU 242 Marketing Service Agreements / GT Mods
Energy Day 2011, Helsinki
Part 1:
Gas Turbine Modernization V94.2 / SGT5-2000E
Christoph Sorgenfrey
Marketing Service Agreements/GT Mods/LTE E-
class GT
Contents
Market Challenges & Modernization Potential
SGT5 2000E Power Plants 4
Si3D Benefits 6
Advantages of Power Limit Increase (PLI) 9
Vuosaari Major Outage 2011 on GT5 12
Christoph Sorgenfrey E S SF REU 242 Marketing Service Agreements / GT Mods
Flexibility of Si3D on turbine stages 1 to 4
More than 1.5 %-pts. gas turbine efficiency
improvement on average
at constant power output fuel cost reduction of 2,5%
and CO2 reduction by 20.000 t p.a.
or more power at constant fuel
consumption = “Green MW”
Extra potential benefits:
extended maintenance cycles
longer service life
more starts per interval
Increased Power Limit* >> 173MW
Siemens innovative 3-Dimensional blades
Technology for higher efficiency and reduced CO2 emissions
Si3D upgrade investment provides fast customer payback
* To be released after testing
Christoph Sorgenfrey E S SF REU 242 Marketing Service Agreements / GT Mods
What does Green Power mean in case of the Si3D upgrade? • CO2 free
• without additional fuel
• it does not create additional operating costs
• equivalent to environmental effect of four 4 MW class wind turbines at same availability
“Green Power” of Si3D upgrade stage 1 to 4
+4 MW @ ~99% availability 16 MW @ ~25% availability
Value of
Green MW
Christoph Sorgenfrey E S SF REU 242 Marketing Service Agreements / GT Mods
Energy Day 2011, Helsinki
Part 1:
Gas Turbine Modernization V94.2 / SGT5-2000E
Christoph Sorgenfrey
Marketing Service Agreements/GT Mods/LTE E-
class GT
Contents
Market Challenges & Modernization Potential
SGT5 2000E Power Plants 4
Si3D Benefits 6
Advantages of Power Limit Increase (PLI) 9
Vuosaari Major Outage 2011 on GT5 12
Christoph Sorgenfrey E S SF REU 242 Marketing Service Agreements / GT Mods
Power Limit Increase (PLI) – Benefits:
Power increase also on cold days Upgrade Potential of V94.2(3)
Ambient Temperature
Pow
erReference (V94.2(3))
V94.2(3) + Si3D 1-4
(including PLI)
V94.2(3) + Si3D 1-4
(including PLI /
TT1=1065°C)
Gas T
urb
ine P
ow
er
Ou
tpu
t [M
W]
Compressor Inlet Temperature [°C]
Reference V94.2(3) @ ISO conditions
V94.2 with Si3D 1-4 & PLI @ reference level
V94.2 with Si3D 1-4 & PLI @ reference +15K
173 MW
> 180 MW
Additional benefit of
power limit increase
Christoph Sorgenfrey E S SF REU 242 Marketing Service Agreements / GT Mods
Relative Exhaust Energy
90
92
94
96
98
100
102
104
Ambient Temperature
Exh
aust
En
erg
y [%
]
Reference (V94.2(3))
V94.2(3) + Si3D 1-4
(including PLI)
V94.2(3) + Si3D 1-4
(including PLI /
TT1=1065°C)
Compressor Inlet Temperature [°C]
Power Limit Increase (PLI) – Benefits:
Exhaust Gas Energy
Reference V94.2 @ 1060°C*
V94.2 with Si3D1-4 & PLI @ 1065°C*
V94.2 with Si3D1-4 & PLI @ 1080°C*
Exh
au
st
En
erg
y [
%]
* Turbine inlet temperature TT1iso
Advantage for district heating / process steam:
More exhaust gas energy at cold ambient temperatures
Christoph Sorgenfrey E S SF REU 242 Marketing Service Agreements / GT Mods
After the validation test in 2012 all V94.2 / SGT5-2000E with
Si3D stages 1 to 4 will get the release for increased maximum power:
More power also on colder days
More potential power for peak load applications
More exhaust gas energy for district heating
Increased potential for flexible grid response
Increased Combined Cycle efficiency
+ Si3D Efficiency benefit over the entire ambient temperature range
Power Limit Increase (PLI) – Benefits:
Summary
Christoph Sorgenfrey E S SF REU 242 Marketing Service Agreements / GT Mods
Energy Day 2011, Helsinki
Part 1:
Gas Turbine Modernization V94.2 / SGT5-2000E
Christoph Sorgenfrey
Marketing Service Agreements/GT Mods/LTE E-
class GT
Contents
Market Challenges & Modernization Potential
SGT5 2000E Power Plants 4
Si3D Benefits 6
Advantages of Power Limit Increase (PLI) 9
Vuosaari Major Outage 2011 on GT5 12
Christoph Sorgenfrey E S SF REU 242 Marketing Service Agreements / GT Mods
Outlook for the PLI winter test
.....we hope it will be a cold
finnish winter!