13
Gas turbine efficiency and power upgrade Vuosaari power plant 2011 Siemens Energy Day, December 15, Dipl. Eng. Christoph Sorgenfrey E S SF REU 242

Gas turbine efficiency and power upgrade Vuosaari · PDF fileGas turbine efficiency and power upgrade Vuosaari power plant 2011 Siemens Energy Day, December 15, Dipl. Eng. Christoph

Embed Size (px)

Citation preview

Page 1: Gas turbine efficiency and power upgrade Vuosaari · PDF fileGas turbine efficiency and power upgrade Vuosaari power plant 2011 Siemens Energy Day, December 15, Dipl. Eng. Christoph

Gas turbine efficiency and power upgrade Vuosaari power plant 2011

Siemens Energy Day, December 15,

Dipl. Eng. Christoph Sorgenfrey E S SF REU 242

Page 2: Gas turbine efficiency and power upgrade Vuosaari · PDF fileGas turbine efficiency and power upgrade Vuosaari power plant 2011 Siemens Energy Day, December 15, Dipl. Eng. Christoph

Christoph Sorgenfrey E S SF REU 242 Marketing Service Agreements / GT Mods

Energy Day 2011, Helsinki

Part 1:

Gas Turbine Modernization V94.2 / SGT5-2000E

Christoph Sorgenfrey

Marketing Service Agreements/GT Mods/LTE E-

class GT

Contents

Market Challenges & Modernization Potential

SGT5 2000E Power Plants 4

Si3D Benefits 6

Advantages of Power Limit Increase (PLI) 9

Vuosaari Major Outage 2011 on GT5 12

Page 3: Gas turbine efficiency and power upgrade Vuosaari · PDF fileGas turbine efficiency and power upgrade Vuosaari power plant 2011 Siemens Energy Day, December 15, Dipl. Eng. Christoph

Christoph Sorgenfrey E S SF REU 242 Marketing Service Agreements / GT Mods

Market Challenges for

V94.2 / SGT5-2000E Combined Cycle Power Plants

High Efficiency

High Availability High Power Output

• Fuel price

• Fuel consumption

• “Green MW”

• Electricity price

• Baseload/

Peak power

• Hot gas parts life

• Refurbishment

• Maintenance intervals

High Flexibility

• Start up capability

• Dual Fuel use

• Grid requirements

• Min Load decrease

Increase

operating range

Low Emission

• NOX & CO limits

• CO2 „trading“

Page 4: Gas turbine efficiency and power upgrade Vuosaari · PDF fileGas turbine efficiency and power upgrade Vuosaari power plant 2011 Siemens Energy Day, December 15, Dipl. Eng. Christoph

Christoph Sorgenfrey E S SF REU 242 Marketing Service Agreements / GT Mods

Example for Modernization Potential of

V94.2 / SGT5-2000E Combined Cycle Power Plants

Modernization potential: *

Up to 9% (40 MW) power output

increase

Up to 11% (50 MW) additional

power output increase with WetC

1% points or more

combined cycle efficiency

improvement

Significant operating cost reduction

Cutting NOX & CO2 emissions

* Subject to specific technical plant evaluation,

expected values with test tolerance @ ISO condition.

Reference: 15 year old CCPP (2x1) rated at 450 MW

Page 5: Gas turbine efficiency and power upgrade Vuosaari · PDF fileGas turbine efficiency and power upgrade Vuosaari power plant 2011 Siemens Energy Day, December 15, Dipl. Eng. Christoph

Christoph Sorgenfrey E S SF REU 242 Marketing Service Agreements / GT Mods

Energy Day 2011, Helsinki

Part 1:

Gas Turbine Modernization V94.2 / SGT5-2000E

Christoph Sorgenfrey

Marketing Service Agreements/GT Mods/LTE E-

class GT

Contents

Market Challenges & Modernization Potential

SGT5 2000E Power Plants 4

Si3D Benefits 6

Advantages of Power Limit Increase (PLI) 9

Vuosaari Major Outage 2011 on GT5 12

Page 6: Gas turbine efficiency and power upgrade Vuosaari · PDF fileGas turbine efficiency and power upgrade Vuosaari power plant 2011 Siemens Energy Day, December 15, Dipl. Eng. Christoph

Christoph Sorgenfrey E S SF REU 242 Marketing Service Agreements / GT Mods

Flexibility of Si3D on turbine stages 1 to 4

More than 1.5 %-pts. gas turbine efficiency

improvement on average

at constant power output fuel cost reduction of 2,5%

and CO2 reduction by 20.000 t p.a.

or more power at constant fuel

consumption = “Green MW”

Extra potential benefits:

extended maintenance cycles

longer service life

more starts per interval

Increased Power Limit* >> 173MW

Siemens innovative 3-Dimensional blades

Technology for higher efficiency and reduced CO2 emissions

Si3D upgrade investment provides fast customer payback

* To be released after testing

Page 7: Gas turbine efficiency and power upgrade Vuosaari · PDF fileGas turbine efficiency and power upgrade Vuosaari power plant 2011 Siemens Energy Day, December 15, Dipl. Eng. Christoph

Christoph Sorgenfrey E S SF REU 242 Marketing Service Agreements / GT Mods

What does Green Power mean in case of the Si3D upgrade? • CO2 free

• without additional fuel

• it does not create additional operating costs

• equivalent to environmental effect of four 4 MW class wind turbines at same availability

“Green Power” of Si3D upgrade stage 1 to 4

+4 MW @ ~99% availability 16 MW @ ~25% availability

Value of

Green MW

Page 8: Gas turbine efficiency and power upgrade Vuosaari · PDF fileGas turbine efficiency and power upgrade Vuosaari power plant 2011 Siemens Energy Day, December 15, Dipl. Eng. Christoph

Christoph Sorgenfrey E S SF REU 242 Marketing Service Agreements / GT Mods

Energy Day 2011, Helsinki

Part 1:

Gas Turbine Modernization V94.2 / SGT5-2000E

Christoph Sorgenfrey

Marketing Service Agreements/GT Mods/LTE E-

class GT

Contents

Market Challenges & Modernization Potential

SGT5 2000E Power Plants 4

Si3D Benefits 6

Advantages of Power Limit Increase (PLI) 9

Vuosaari Major Outage 2011 on GT5 12

Page 9: Gas turbine efficiency and power upgrade Vuosaari · PDF fileGas turbine efficiency and power upgrade Vuosaari power plant 2011 Siemens Energy Day, December 15, Dipl. Eng. Christoph

Christoph Sorgenfrey E S SF REU 242 Marketing Service Agreements / GT Mods

Power Limit Increase (PLI) – Benefits:

Power increase also on cold days Upgrade Potential of V94.2(3)

Ambient Temperature

Pow

erReference (V94.2(3))

V94.2(3) + Si3D 1-4

(including PLI)

V94.2(3) + Si3D 1-4

(including PLI /

TT1=1065°C)

Gas T

urb

ine P

ow

er

Ou

tpu

t [M

W]

Compressor Inlet Temperature [°C]

Reference V94.2(3) @ ISO conditions

V94.2 with Si3D 1-4 & PLI @ reference level

V94.2 with Si3D 1-4 & PLI @ reference +15K

173 MW

> 180 MW

Additional benefit of

power limit increase

Page 10: Gas turbine efficiency and power upgrade Vuosaari · PDF fileGas turbine efficiency and power upgrade Vuosaari power plant 2011 Siemens Energy Day, December 15, Dipl. Eng. Christoph

Christoph Sorgenfrey E S SF REU 242 Marketing Service Agreements / GT Mods

Relative Exhaust Energy

90

92

94

96

98

100

102

104

Ambient Temperature

Exh

aust

En

erg

y [%

]

Reference (V94.2(3))

V94.2(3) + Si3D 1-4

(including PLI)

V94.2(3) + Si3D 1-4

(including PLI /

TT1=1065°C)

Compressor Inlet Temperature [°C]

Power Limit Increase (PLI) – Benefits:

Exhaust Gas Energy

Reference V94.2 @ 1060°C*

V94.2 with Si3D1-4 & PLI @ 1065°C*

V94.2 with Si3D1-4 & PLI @ 1080°C*

Exh

au

st

En

erg

y [

%]

* Turbine inlet temperature TT1iso

Advantage for district heating / process steam:

More exhaust gas energy at cold ambient temperatures

Page 11: Gas turbine efficiency and power upgrade Vuosaari · PDF fileGas turbine efficiency and power upgrade Vuosaari power plant 2011 Siemens Energy Day, December 15, Dipl. Eng. Christoph

Christoph Sorgenfrey E S SF REU 242 Marketing Service Agreements / GT Mods

After the validation test in 2012 all V94.2 / SGT5-2000E with

Si3D stages 1 to 4 will get the release for increased maximum power:

More power also on colder days

More potential power for peak load applications

More exhaust gas energy for district heating

Increased potential for flexible grid response

Increased Combined Cycle efficiency

+ Si3D Efficiency benefit over the entire ambient temperature range

Power Limit Increase (PLI) – Benefits:

Summary

Page 12: Gas turbine efficiency and power upgrade Vuosaari · PDF fileGas turbine efficiency and power upgrade Vuosaari power plant 2011 Siemens Energy Day, December 15, Dipl. Eng. Christoph

Christoph Sorgenfrey E S SF REU 242 Marketing Service Agreements / GT Mods

Energy Day 2011, Helsinki

Part 1:

Gas Turbine Modernization V94.2 / SGT5-2000E

Christoph Sorgenfrey

Marketing Service Agreements/GT Mods/LTE E-

class GT

Contents

Market Challenges & Modernization Potential

SGT5 2000E Power Plants 4

Si3D Benefits 6

Advantages of Power Limit Increase (PLI) 9

Vuosaari Major Outage 2011 on GT5 12

Page 13: Gas turbine efficiency and power upgrade Vuosaari · PDF fileGas turbine efficiency and power upgrade Vuosaari power plant 2011 Siemens Energy Day, December 15, Dipl. Eng. Christoph

Christoph Sorgenfrey E S SF REU 242 Marketing Service Agreements / GT Mods

Outlook for the PLI winter test

.....we hope it will be a cold