g PE ADZ 7E03040103 LAY 745 R05 Dam Control Room Mechanical Plants Layout

Embed Size (px)

Citation preview

  • 8/16/2019 g PE ADZ 7E03040103 LAY 745 R05 Dam Control Room Mechanical Plants Layout

    1/1

    New block-out

    SECOND FLOOR

    SAL01AH001

    SAL01AN004

    SAL01AN005

    SAL01AN006

    WASTE WATER DRAINING OUT OF SUPPLY

    LOCAL

    PRINCIPAL BT

    2 1

    . 0 . 2

    0

    21.0.921.0.14

    CUARTO DEBATERIAS

    OFICINA

    CUARTO CONTROLCOMPUERTAS

    COCINA

    B

    B

    400500

    New block-outuntil ground floor

    New block-out

    250500

    New block-out

    500

    200250

    1080

    New block-out

    500

    4 0 0

    2 5 0

    New block-out350x200

    2 1

    . 0 . 8

    2 1

    . 0 . 7

    B

    B

    TANQUE

    New block-outuntil ground floor

    Cooling capacity

    OUTDOOR UNIT MONOSPLIT

    CARATTERISTICHE TECNICHE

    3.6 kW

    1.13 kW

    Power consumption 0.98 kW

    Electrical supply 400/3/60

    Heating capacity 4.1 kW

    Indoor Unit Weight kg 13

    Refrigerant R410

    Outdoor unit dimension (HxLxP) mm 850x840x330

    Indoor unit dimension (HxLxP) mm 295x898x249

    Outdoor Unit Weight kg 42

    Power consumption

    Note:Drainage pipe must be connected with main drainage system.

    All block-out will be performed out leaving 50 cm from the ceiling of the room

    SAL01AH001

    PANZERI SPA22070 Luisago (CO)via Milano, 1/atel. +39 031.550.210fax+39 [email protected]

    www.panzeri-spa.itp.iva e c.f. 00616780136R.E.A. Como 154038

    REG.IMP. Milano 00616780136Sede Legale : 20123 Milano - Via Vincenzo Gioberti, 8

    R.E.A. Milano 1945284

    GyM

    1:50