28
All Rights Reserved ©2013 Tokyo Electric Power Company, Inc. Fukushima Nuclear Accident ~Personal Perspective on The Human Impact~ National Radiological Emergency Preparedness Conference Austin, Texas April 8 th , 2013 Kenji Tateiwa Manager, Nuclear Power Programs Tokyo Electric Power Company, Washington Office [email protected]

Fukushima Nuclear Accident - National REP 7_SLIDES_Human Impact...Fukushima Nuclear Accident ... Austin, Texas April 8th, 2013 Kenji Tateiwa Manager, Nuclear Power Programs Tokyo Electric

  • Upload
    buibao

  • View
    217

  • Download
    3

Embed Size (px)

Citation preview

Page 1: Fukushima Nuclear Accident - National REP 7_SLIDES_Human Impact...Fukushima Nuclear Accident ... Austin, Texas April 8th, 2013 Kenji Tateiwa Manager, Nuclear Power Programs Tokyo Electric

All Rights Reserved ©2013 Tokyo Electric Power Company, Inc.

Fukushima Nuclear Accident ~Personal Perspective on The Human Impact~

National Radiological

Emergency Preparedness Conference

Austin, Texas

April 8th, 2013

Kenji Tateiwa Manager, Nuclear Power Programs

Tokyo Electric Power Company, Washington Office

[email protected]

Page 2: Fukushima Nuclear Accident - National REP 7_SLIDES_Human Impact...Fukushima Nuclear Accident ... Austin, Texas April 8th, 2013 Kenji Tateiwa Manager, Nuclear Power Programs Tokyo Electric

All Rights Reserved ©2013 Tokyo Electric Power Company, Inc. 2

’90~’96: Kyoto University

BS/MS in Nuclear Engineering

’96~: TEPCO

’96~’00: Fukushima Daini NPS

’00~’02: Nuclear Engineering Dept.,

Tokyo-H/Q

’02~’04: MBA, Stanford Graduate

School of Business

’04~’05: Nuclear Engineering Dept.

’05~’11: International Affairs Dept.

Mar.~Sept.’11: Fukushima Response

Int’l Team, Tokyo-H/Q

Sept. ’11~: Washington DC Office

My Background

Pursued “Nuclear

Renaissance” in Texas (June 2010)

TEPCO class of ‘96

in Naraha-town, Fukushima (Jan. 2000)

Page 3: Fukushima Nuclear Accident - National REP 7_SLIDES_Human Impact...Fukushima Nuclear Accident ... Austin, Texas April 8th, 2013 Kenji Tateiwa Manager, Nuclear Power Programs Tokyo Electric

All Rights Reserved ©2013 Tokyo Electric Power Company, Inc. 3

My Post-Accident Activities

IAEA Preliminary Mission (4/6/2011@1F) IAEA: International Atomic Energy Agency

Page 4: Fukushima Nuclear Accident - National REP 7_SLIDES_Human Impact...Fukushima Nuclear Accident ... Austin, Texas April 8th, 2013 Kenji Tateiwa Manager, Nuclear Power Programs Tokyo Electric

All Rights Reserved ©2013 Tokyo Electric Power Company, Inc. 4

“Bedroom” of Emergency Response Center (5/21/2011@1F)

My Post-Accident Activities

Page 5: Fukushima Nuclear Accident - National REP 7_SLIDES_Human Impact...Fukushima Nuclear Accident ... Austin, Texas April 8th, 2013 Kenji Tateiwa Manager, Nuclear Power Programs Tokyo Electric

All Rights Reserved ©2013 Tokyo Electric Power Company, Inc. 5

Discussion with U.S. INPO-Industry

Support Team (8/19/2011@2F)

“Nothing has been

more important in

my career than

supporting TEPCO.”

INPO: Institute of Nuclear Power Operations

My Post-Accident Activities

Page 6: Fukushima Nuclear Accident - National REP 7_SLIDES_Human Impact...Fukushima Nuclear Accident ... Austin, Texas April 8th, 2013 Kenji Tateiwa Manager, Nuclear Power Programs Tokyo Electric

All Rights Reserved ©2013 Tokyo Electric Power Company, Inc. 6

http://archive.shinsai.yahoo.co.jp/

http://archive.shinsai.yahoo.co.jp/

http://archive.shinsai.yahoo.co.jp/ Cruise Ship Stranded

Houses Swept Away

March 11, 2011 at 2:46pm

Magnitude 9.0

19,000 dead/missing

Largest earthquake/tsunami

in recorded history of Japan

Great East Japan Earthquake (GEJE)

Page 7: Fukushima Nuclear Accident - National REP 7_SLIDES_Human Impact...Fukushima Nuclear Accident ... Austin, Texas April 8th, 2013 Kenji Tateiwa Manager, Nuclear Power Programs Tokyo Electric

All Rights Reserved ©2013 Tokyo Electric Power Company, Inc. 7

Damage Caused by GEJE (cont’d)

http://archive.shinsai.yahoo.co.jp/

Gas Tank Exploded

Fire Truck Abandoned

http://archive.shinsai.yahoo.co.jp/

Page 8: Fukushima Nuclear Accident - National REP 7_SLIDES_Human Impact...Fukushima Nuclear Accident ... Austin, Texas April 8th, 2013 Kenji Tateiwa Manager, Nuclear Power Programs Tokyo Electric

All Rights Reserved ©2013 Tokyo Electric Power Company, Inc. 8

Comparison of Seismic Energy (Magnitude)

GEJE (2011)

Keicho-Sanriku

(1611)

Jogan

(869)

Meiji Sanriku

(1896) Hanshin Awaji

(1995) 6,400 casualties

Virginia,

USA

(2011)

M5.8

x 63,000

http://wcrnews.wordpress.com/2011/08/23/5-9-earthquake-rocks-virginia-d-c/

Page 9: Fukushima Nuclear Accident - National REP 7_SLIDES_Human Impact...Fukushima Nuclear Accident ... Austin, Texas April 8th, 2013 Kenji Tateiwa Manager, Nuclear Power Programs Tokyo Electric

All Rights Reserved ©2013 Tokyo Electric Power Company, Inc. 9

Impact of GEJE to TEPCO Facilities

Epicenter

52 GW

31 GW

Before

earthquake

Shortly after

earthquake

Lost 40% of

power supply

capacity

Shutdown: Nuclear power: 7 units

Thermal power: 12 units

Hydro power: 25 units

Substations: 8

Power outage: 4 million households

Rolling blackout for 10 days

Massive interruption of

infrastructure: Public transportation

Telecommunication

Food/water supply

Page 10: Fukushima Nuclear Accident - National REP 7_SLIDES_Human Impact...Fukushima Nuclear Accident ... Austin, Texas April 8th, 2013 Kenji Tateiwa Manager, Nuclear Power Programs Tokyo Electric

All Rights Reserved ©2013 Tokyo Electric Power Company, Inc. 10

TEPCO’s Nuclear Power Stations

(source) JAIF

U-1 U-2

U-3 U-4

Fukushima Daini (2F)

U-6 U-5

U-1 U-2

U-3 U-4

Fukushima Daiichi (1F) Kashiwazaki-Kariwa (KK)

U-1 U-2

U-3 U-4

U-5,6,7

Page 11: Fukushima Nuclear Accident - National REP 7_SLIDES_Human Impact...Fukushima Nuclear Accident ... Austin, Texas April 8th, 2013 Kenji Tateiwa Manager, Nuclear Power Programs Tokyo Electric

All Rights Reserved ©2013 Tokyo Electric Power Company, Inc. 11

TEPCO Emergency Response Centers (ERC)

Video

conference

among multiple

ERCs played

instrumental role

Tokyo H/Q Fukushima Daiichi

Page 12: Fukushima Nuclear Accident - National REP 7_SLIDES_Human Impact...Fukushima Nuclear Accident ... Austin, Texas April 8th, 2013 Kenji Tateiwa Manager, Nuclear Power Programs Tokyo Electric

All Rights Reserved ©2013 Tokyo Electric Power Company, Inc. 12 (C)GeoEye

Impact of Earthquake/Tsunami at 1F

Unit

1 Unit

2 Unit

3

Unit

4 Unit

6

Unit

5

Radwaste

Processing

building

After the Earthquake (near design-basis):

Loss of all off-site power

Plant responded as designed (automatic shutdown of operating

units/startup of emergency diesel generators)

After the Tsunami (beyond design-basis):

Station Black Out (SBO) for 5 out of 6 units

Loss of almost all safety system, instrumentation, lighting, etc.

Seismically Isolated Bldg. (ERC)

Page 13: Fukushima Nuclear Accident - National REP 7_SLIDES_Human Impact...Fukushima Nuclear Accident ... Austin, Texas April 8th, 2013 Kenji Tateiwa Manager, Nuclear Power Programs Tokyo Electric

All Rights Reserved ©2013 Tokyo Electric Power Company, Inc. 13

1 2

3 4

Breakwater

(height: 10m)

Tsunami Observed at 1F

Page 14: Fukushima Nuclear Accident - National REP 7_SLIDES_Human Impact...Fukushima Nuclear Accident ... Austin, Texas April 8th, 2013 Kenji Tateiwa Manager, Nuclear Power Programs Tokyo Electric

All Rights Reserved ©2013 Tokyo Electric Power Company, Inc. 14

撮影日 :2011/3/11 15:42

Tsunami Observed at 1F (cont’d)

撮影日:2011/3/11 15:42 撮影日:2011/3/11 15:43

撮影日:2011/3/11 15:43 撮影日:2011/3/11 15:43 撮影日:2011/3/11 15:44

重油タンク Tank (height:5.5m)

Ground Level (10m above sea)

Car Stuck in the Building

Tank Fully Submerged

Page 15: Fukushima Nuclear Accident - National REP 7_SLIDES_Human Impact...Fukushima Nuclear Accident ... Austin, Texas April 8th, 2013 Kenji Tateiwa Manager, Nuclear Power Programs Tokyo Electric

All Rights Reserved ©2013 Tokyo Electric Power Company, Inc. 15

Accident Response at 1F: In the Field

Roads blocked by tsunami debris

Roads damaged by earthquake

Continual aftershocks,

tsunami alerts, open

manholes, etc.

exacerbated the situation.

Page 16: Fukushima Nuclear Accident - National REP 7_SLIDES_Human Impact...Fukushima Nuclear Accident ... Austin, Texas April 8th, 2013 Kenji Tateiwa Manager, Nuclear Power Programs Tokyo Electric

All Rights Reserved ©2013 Tokyo Electric Power Company, Inc. 16

Supervised

operation wearing

full-face mask.

Checked

instrumentation in near-

complete darkness.

Brought in heavy

batteries to restore

instrumentations.

Lack of:

instrumentation, communication

means, lighting, food, water, sleep, ...

Increase in:

radiation level, fatigue, fear, despair, ...

Accident Response at 1F: In the Main Control Room

Page 17: Fukushima Nuclear Accident - National REP 7_SLIDES_Human Impact...Fukushima Nuclear Accident ... Austin, Texas April 8th, 2013 Kenji Tateiwa Manager, Nuclear Power Programs Tokyo Electric

All Rights Reserved ©2013 Tokyo Electric Power Company, Inc. 17

72

AO

ボンベ

210

MO ラプチャーディスク排気筒

1AO

ボンベ

83

AO閉

閉90

AO

0.549MPabsで破壊

RPV

D/W

RPVRPV

D/W

IA

IA

D/W最高使用圧力0.528MPabs

ベント実施圧力0.954MPabs

電磁弁

電磁弁

213

AO

Remote operation

unavailable due

to SBO.

MO

AO

AO

AO

AO

MO

Exhaust

stack

Rupture

disc

Six men formed 3 “last-resort teams” to manually

open 2 valves in highly-radioactive area.

Core damage already progressing by this time

(3/12 9:04-9:30).

One operator exceeded 100 mSv (10 rem).

Venting

required to

avoid

catastrophic

failure.

Accident Response at 1F: Containment Venting (Unit 1)

Page 18: Fukushima Nuclear Accident - National REP 7_SLIDES_Human Impact...Fukushima Nuclear Accident ... Austin, Texas April 8th, 2013 Kenji Tateiwa Manager, Nuclear Power Programs Tokyo Electric

All Rights Reserved ©2013 Tokyo Electric Power Company, Inc. 18

inoperable

standby

Shallow

Draft Quay

Sea

Valve Pit Valve Pit Valve Pit Valve Pit

Fire

Cistern

Fire

Cistern

Fire

Cistern

Fire

Cistern Fire

Cistern

Fire trucks played critical role in

injecting water into reactors.

Fire brigade operated fire trucks

amidst high radiation/successive

explosions.

Status as of 3/14/2011

Accident Response at 1F: Water Injection by Fire Trucks

Page 19: Fukushima Nuclear Accident - National REP 7_SLIDES_Human Impact...Fukushima Nuclear Accident ... Austin, Texas April 8th, 2013 Kenji Tateiwa Manager, Nuclear Power Programs Tokyo Electric

All Rights Reserved ©2013 Tokyo Electric Power Company, Inc. 19

Date 1F 2F

1 2 3 4 5 6 1 2 3 4

3/11

3/12

3/13

3/14

3/15

3/16-

19

3/20

3/14 17:00

3/14 1:24

RHR 3/14 7:13

RHR

3/14 15:42

RHR

3/14 18:00

3/15 7:15

3/12 12:15

3/20 14:30

3/19 22:14

RHR

3/12 8:13

D/G-6B

3/22 10:35

P/C-4D

3/22 10:36

P/C-4D

3/20 15:46

P/C-2C

3/20 15:46

P/C-2C

3/19 5:00

RHR

3/20 14:30

Station Blackout

Loss of Ultimate Heat Sink

Cold Shutdown

3/12 15:36 Unit 1 Explosion

3/15 6:00-6:10 Unit 4 Explosion

3/14 11:01 Unit 3 Explosion

3/11 15:27 1st Tsunami, 15:35 2nd Tsunami 3/11 15:22~ Tsunamis

Water Injection: NO

Heat Removal: NO

Water Injection: YES

Heat Removal: NO

Water Injection: YES

Heat Removal: YES

Overview of the 10-Unit Simultaneous Accidents

Page 20: Fukushima Nuclear Accident - National REP 7_SLIDES_Human Impact...Fukushima Nuclear Accident ... Austin, Texas April 8th, 2013 Kenji Tateiwa Manager, Nuclear Power Programs Tokyo Electric

All Rights Reserved ©2013 Tokyo Electric Power Company, Inc. 20

0

20

40

60

80

100

120

140

160

180

200

3/11

3/12

3/13

3/14

3/15

3/16

3/17

3/18

3/19

3/20

3/21

3/22

3/23

3/24

3/25

0

50

100

150

200

250

300

350

400

450

500

Daily

Cumulative

Hundreds of Aftershocks Greater than M 5.0 D

aily

Num

ber

of A

fters

hocks

Cum

ula

tive N

um

ber

of A

fters

hocks

On March 11th alone

179 times > M 5.0

38 times > M6.0

3 times > M7.0

cf. Earthquake in Virginia

on Aug. 23, 2011: M 5.8

(Source) Japan Meteorological Agency

Page 21: Fukushima Nuclear Accident - National REP 7_SLIDES_Human Impact...Fukushima Nuclear Accident ... Austin, Texas April 8th, 2013 Kenji Tateiwa Manager, Nuclear Power Programs Tokyo Electric

All Rights Reserved ©2013 Tokyo Electric Power Company, Inc. 21

“In an attempt to check the status of Unit 4

D/G, I was trapped inside the security gate

compartment. Soon the tsunami came and I

was minutes away from being drowned,

when my colleague smash opened the

window and saved my life.”

“In total darkness, I could hear the unearthly

sound of SRV dumping steam into the torus.

I stepped on the torus to open the S/C spray

valve, and my rubber boot melted.”

“Unit 3 could explode anytime soon, but it

was my turn to go to the main control room.

I called my dad and asked him to take good

care of my wife and kids should I die.”

Voices from the Field

Unit 1 Main

Control Room

Torus Room

Page 22: Fukushima Nuclear Accident - National REP 7_SLIDES_Human Impact...Fukushima Nuclear Accident ... Austin, Texas April 8th, 2013 Kenji Tateiwa Manager, Nuclear Power Programs Tokyo Electric

All Rights Reserved ©2013 Tokyo Electric Power Company, Inc. 22

“I was determined to stay behind to my

death; however I was resolved to send

my men back home alive.” (Ikuo Izawa, Shift Manager)

“Let me go and vent the containment.

I know where the valve is and I can

run fast. Let me protect the unit that I

love.”

(Kazuhiro Yoshida, Deputy Shift Manager)

Voices from the Field (cont’d)

“The Man Who Saw

The Brink of Death”

“Book reveals human drama in

Fukushima No. 1 crisis”

The Japan Times 12/11/2012 http://www.japantimes.co.jp/news/2012/12/11/national/book-

reveals-human-drama-in-fukushima-no-1-crisis/

“At that time, I was conjuring up

faces of fellow colleagues who would

die with me.” (Masao Yoshida, Site Superintendent)

Page 23: Fukushima Nuclear Accident - National REP 7_SLIDES_Human Impact...Fukushima Nuclear Accident ... Austin, Texas April 8th, 2013 Kenji Tateiwa Manager, Nuclear Power Programs Tokyo Electric

All Rights Reserved ©2013 Tokyo Electric Power Company, Inc. 23

Current Status of 1F

Live Camera Image (as of 3/10/2013) http://www.tepco.co.jp/en/nu/f1-np/camera/index-e.html

All reactors stably cooled by circulating water system

Radioactivity release significantly reduced

Preparation ongoing for removal of fuels from spent fuel pools

Progress being made in investigating inside containment vessels

Page 24: Fukushima Nuclear Accident - National REP 7_SLIDES_Human Impact...Fukushima Nuclear Accident ... Austin, Texas April 8th, 2013 Kenji Tateiwa Manager, Nuclear Power Programs Tokyo Electric

All Rights Reserved ©2013 Tokyo Electric Power Company, Inc. 24

1 μSv/h = 8.76 mSv/y

2.3 μSv/h = 20 mSv/y

Evacuation zones to be relaxed for

areas below 20 mSv/y

Int’l consensus on health impact of

low-dose radiation urgently needed

http://www.reconstruction.go.jp/topics/20130307_shiryo1-1.pdf

Aerial Radiation Dose Map (μSv/h at 1 m above ground; as of Dec. 2012)

Evacuation Zones

(from April 2013)

1F

Measure

d

Valu

e

1F

10km 20km

30km

:Evacuation Release Prepared Area

:Residence Restricted Area

:Return Difficulty Area

:Restricted Area

:Deliberate Evacuation Area

Current Status of 1F: Off-site Radiation Dose and Evacuation Zones

http://ramap.jaea.go.jp/map/map.html

Page 25: Fukushima Nuclear Accident - National REP 7_SLIDES_Human Impact...Fukushima Nuclear Accident ... Austin, Texas April 8th, 2013 Kenji Tateiwa Manager, Nuclear Power Programs Tokyo Electric

All Rights Reserved ©2013 Tokyo Electric Power Company, Inc. 25

Water-tight doors Seawall

D/G trucks (500kVA): 23

GTG trucks (4500kVA): 2 Fire trucks: 8

Current

After

Width: 15 m

Length: 1.5 km

Heig

ht:

10 m

(1

5 m

abo

ve s

ea)

Safety Enhancement Measures at Kashiwazaki-Kariwa NPS

Page 26: Fukushima Nuclear Accident - National REP 7_SLIDES_Human Impact...Fukushima Nuclear Accident ... Austin, Texas April 8th, 2013 Kenji Tateiwa Manager, Nuclear Power Programs Tokyo Electric

All Rights Reserved ©2013 Tokyo Electric Power Company, Inc. 26

Reforming TEPCO’s Nuclear Operation

Nuclear Reform Monitoring Committee Dr. Dale Klein, Chairman (Former Chairman, U.S. Nuclear Regulatory Commission)

Lady Barbara Judge, Deputy Chairman (Former Chairman, U.K. Atomic Energy Authority)

Dr. Kenichi Ohmae, Member (CEO, Business Breakthrough, Inc.)

Mr. Masafumi Sakurai, Member (Former Superintendent Public Prosecutor)

Mr. Kazuhiko Shimokobe, Member (Chairman, TEPCO)

Mr. Kazuhiro Suzuki, Secretary-General (CEO, Nuclear Fuel Transport Co.)

TE

PC

O B

oard

of

Dir

ecto

rs

Reporting Observation / Supervision

Supervision

TEPCO Nuclear Reform Special Task force Mr. Naomi Hirose (President)

Mr. Zengo Aizawa (Chief Nuclear Officer)

Mr. Takafumi Anegawa (General Manager, Nuclear Asset Management Dept.)

Reference

Reporting

Observation

Request

Proposal

Execution

Page 27: Fukushima Nuclear Accident - National REP 7_SLIDES_Human Impact...Fukushima Nuclear Accident ... Austin, Texas April 8th, 2013 Kenji Tateiwa Manager, Nuclear Power Programs Tokyo Electric

All Rights Reserved ©2013 Tokyo Electric Power Company, Inc. 27

My Post-Accident Activities in the U.S.

Nuclear Industry Gov’t Agencies

Professional Organizations,

Think Tanks, NPOs Academia Global

Organizations

Committed to disseminating lessons learned globally and

working together to make nuclear power plants safer.

Page 28: Fukushima Nuclear Accident - National REP 7_SLIDES_Human Impact...Fukushima Nuclear Accident ... Austin, Texas April 8th, 2013 Kenji Tateiwa Manager, Nuclear Power Programs Tokyo Electric

All Rights Reserved ©2013 Tokyo Electric Power Company, Inc. 28

References

[Japan] Tokyo Electric Power Company (TEPCO) http://www.tepco.co.jp/en/nu/fukushima-np/index-e.html

Nuclear Reform Monitoring Committee of

TEPCO http://www.nrmc.jp/en/index-e.html

Ministry of Economy, Trade and Industry

(METI) http://www.meti.go.jp/english/earthquake/

Nuclear Regulation Authority (NRA) http://www.nsr.go.jp/english/

Japan Atomic Industrial Forum (JAIF) http://www.jaif.or.jp/english/

Japan Nuclear Safety Institute (JANSI) http://www.genanshin.jp/english/index.html

[USA] Institute of Nuclear Power Operations

(INPO) http://www.nei.org/filefolder/INPO_11-005_Fukushima_Addendum_1.pdf

Electric Power Research Institute (EPRI) http://www.epri.com/Pages/Default.aspx

Nuclear Energy Institute (NEI) http://safetyfirst.nei.org/japan/

National Academy of Science—

Fukushima Lessons Learned Committee http://www8.nationalacademies.org/cp/projectview.aspx?key=49465

[International]

International Atomic Energy Agency

(IAEA) http://www.iaea.org/

World Association of Nuclear Operators

(WANO) http://www.wano.info/

World Health Organization (WHO) http://www.who.int/entity/ionizing_radiation/pub_meet/fukushima_rep

ort/en/index.html