    Feasibility Study

    Setup Manual

    Bremerton United Methodist Church

    February 2014

    The FOCUS Group, Inc.521 A1A Beach Blvd

    St. Augustine, FL 32080800.324.9117 office800.324.8816 faxwww.tfgrp.com

    The FOCUS Group, Inc. 2014

  • 8/12/2019 FS Setup Manual - BUM

    2/29

    March 11, 2014

    Rev. Marta SchellbergBremerton United Methodist Church1150 Marina DriveBremerton, WA 98312

    Dear Marta,

    Thank you for partnering with The FOCUS Group to conduct the feasibility study forBremerton United Methodist Churchscapital campaign.

    This Feasibility Study Setup Manual will serve as a guide for the feasibility study associateand the staff to prepare for the study.

    The feasibility study report will include specific recommendations for moving forward to planand conduct your capital campaign. Our pledge to you is that our research andrecommendations will be at the highest professional level available in fund raising today.While the strictest level of confidence will be maintained with the interviewees, you will receivespecific documentation that serves as the basis for our analysis and recommendations.

    I want to assure you and the leadership at Bremerton United Methodist Church, that as we meet

    with major donors and others in your constituency, we are keenly aware that we represent you.We will do everything we can to encourage the respondents interest in and support for yourmission.

    From time to time we will give you periodic reports on how the study is proceeding. However,if you have questions or need any additional information at any time, please do not hesitate tocontact me.

    Sincerely yours,

    Andy SearsConsultant

  • 8/12/2019 FS Setup Manual - BUM

    3/29

    1

    TABLE OF CONTENTS

    Page

    Glossary of Terms

    Critical Highlights Overview

    Guidelines for Scheduling Interviews

    2

    3

    4-6

    Guidelines for Selecting Respondents for Interviews 7-10

    Guidelines for Leadership Team Making Initial Contact 11-12

    Feasibility Study Timetable 13-16

    Sample Documents

    Interview Schedule Interview Fact Sheet Sample Letters

    Institutional Data Instructions

    17-23

    1819

    20-23

    24-25

    Feasibility Study Associate (FSA) Job description 26-27

  • 8/12/2019 FS Setup Manual - BUM

    4/29

    2

    GLOSSARY OF TERMS

    BUMC Bremerton United Methodist Church

    TFG The FOCUS Group

    Leadership Team Marta Schellberg

    FSA Feasibility Study Associate

    CA Consultant AssociateTravis [email protected](m) 904.540.8881

    TFG Consultants Andy [email protected]

    503.766.4734

    Kristina [email protected](m) 360.710.5646

    Priority designations:

    Priority 1 Most highly preferredPriority 2 Next level of preference

    Priority 3 Candidates for a focus groupPriority 4 Leadership Team

    Specific documents are identified in italicsthroughout these materials.

  • 8/12/2019 FS Setup Manual - BUM

    5/29

    3

    CRITICAL HIGHLIGHTS OVERVIEW(details follow)

    Complete Case Statement. Complete the list of

    fifty prioritized respondents.

    Leadership Team calls priority 1prospective respondents to personallyinvite their participation. Then,invitation letters are sent.

    FSA calls respondentsafter invitation calls aremade to schedule aninterview.

    FSA sends interview confirmation letter and

    case statement draft at least one week inadvance of interview.

    FSA sends completed Interview FactSheet for each respondent to the CA oneweek in advance of interview.

    FSA updates anychanges to the InterviewSchedulein Google docs& notifies CA via emailby the end of the day ofthe change.

  • 8/12/2019 FS Setup Manual - BUM

    6/29

    4

    GUIDELINESFOR SCHEDULING INTERVIEWS

  • 8/12/2019 FS Setup Manual - BUM

    7/29

    5

    GUIDELINES FOR SCHEDULING INTERVIEWS

    1. Develop an interview strategy based on geographic location and priority. Tomaximize the interviewers time and save travel costs, it is imperative to determineand adhere to an overall geographic strategy.

    2. Prioritize respondents with the Leadership Team to determine who to call first.3. Obtain consultants available days to conduct interviews from the CA.4. Offer consultants available dates to the respondent based on geographic strategy. If

    you have a specific time in mind based on other interviews already scheduled, askthe respondent if they could do an interview during specific times. The scheduleshould be built around priority 1 respondents.

    5. Interview dates should be confirmed at least two weeks in advance in order to helpkeep travel costs as low as possible.

    6. The appointment is not finalized until TFG consultants and CA verify the schedule,taking flights and travel times into consideration.

    7. Send the respondent the Case Statementand Confirmation Letterfor the interviewapproximately one week in advance after the appointment is confirmed. TFG hasfound it valuable to send both an electronic and hard copy. Call to confirm receiptof materials and to confirm interview 3 daysprior to visit.

    8. Attempt to schedule five or more interviews per day for each consultant. Days withfewer than five interviews must be cleared by the CA.

    9. The FOCUS Group offers extra interview days at the following rate:

    Minimum Charge is Day (4 hours) 2 Interviews is Day (6 hours) 3 Interviews or more is 1 day (8 hours) If an entire day has been reserved, but no interviews scheduled by the

    preceding week, the day may be billed as a full day

    10.The Fact Sheetshould be filled out as completely as possible and emailed to the CAwith the directions one week in advance in order to maximize the effectiveness ofthe interview. Include as many phone numbers as possible for each respondent,including the phone number of the interview site and/or the respondents cellphone number. The CA will forward the Fact Sheetand directions to the appropriate

    consultant.

    11.Phone interviews are possible, but should be scheduled sparingly. Face-to-faceinterviews are much more effective. Phone interviews are scheduled when arespondent lives in an area where there are no other interviews planned, or forrespondents who are not considered major donors. A respondents lack ofavailability on the scheduled days (i.e., out of town or illness) may necessitate aphone interview.

  • 8/12/2019 FS Setup Manual - BUM

    8/29

    6

    12.Update the Interview Schedulein Google docs and email the CA each time somethingchanges. This information includes: total interviews scheduled, interviewscompleted, and interviews yet to schedule. These updates are important to ensure

    that the contracted number of interviews is completed and to maintain clearcommunication between BUMC and TFG.

    TIMING CONSIDERATIONS

    In general, each interview should last approximately one hour. When schedulinginterviews, there are a few considerations to keep in mind that will help ensureconsultants enough space to travel between interviews in a timely manner and to honorthe respondents that agree to participate in the feasibility study.

    1. Consider travel time, parking and additional situations, and commuter traffic inscheduling appointments. Allow at leastfifteen minutesas a buffer, in addition totravel time, for traffic, parking, etc.

    2. When scheduling an interview over a meal, please allow for one and a half hoursforthe interview.

    3. When scheduling an interview with a couple in their home, please allow for one hourand fifteen minutesfor the interview.

  • 8/12/2019 FS Setup Manual - BUM

    9/29

    7

    GUIDELINES

    FOR

    SELECTING

    RESPONDENTS FOR INTERVIEWS

  • 8/12/2019 FS Setup Manual - BUM

    10/29

    8

    GUIDELINES FOR SELECTING RESPONDENTS FOR INTERVIEWS

    The FOCUS Group will be examining four fundamental factors in the feasibility study:

    1. The case statement

    2. The support for the proposed initiatives

    3. The leadership potential for the campaign

    4. The giving potential for the campaign

    As you consider these four factors, focus on the people and constituencies from whomBUMCcan recruit leadersand raise major gifts. Once you have determined the verybest people to interview regarding these four factors, make sure the selection isbalanced in terms of covering the various influence groups across the BUMCconstituencies.

    The process.TFG will be conducting approximately thirty to thirty-five individual interviews orfocus group interviews. In light of this, approximately fifty respondents should beidentified to offset lack of availability of some respondents due to travel or personalreasons. Most of the individual/couple interviews will be approximately an hour.Interviews will take place at BUMC or in offices, restaurants or in homes of theinterviewees. Interviews may be scheduled over a meal when appropriate.

    The interview fact sheet.Each interview must be approached with goals in mind related to the factors noted

    above. Each respondent will be asked to comment on all four, but the consultants needto know beforehand in which areas the respondent can best contribute. Thisinformation should be noted on the Interview Fact Sheet.

    Major donors and potential leaders.A minimum of eighty percent of the interviews should be with priority one people whoare targeted as major donors ($50,000 or higher pledged over three years) and majordonors who have the stature and experience to be leaders in the campaign. Hopefullythere will be major donors among the other twenty percent. This latter group isimportant, nevertheless, since by virtue of their association with BUMC, they will be

    able to give good insight on the case for the campaign and recommendations forleadership. The best examples of this latter group are executive/pastoral leadershipand current or former board members.

    Focus groups.Where appropriate there could be several focus groups. A focus group is equal to oneindividual interview and is appropriate for respondents who are not major donorprospects.

  • 8/12/2019 FS Setup Manual - BUM

    11/29

    9

    Selecting Respondents.When selecting respondents, plan as many interviews as possible keeping the followingthree critical factors in mind:

    Connection/interest:Select people who have a history of relationship toBUMC and/or a board member and/or someone on staff.

    Ability:Have clear evidence that they are individuals with substantial networth. "Substantial" should be defined as individuals worth multiplemillions, not simply millionaires.

    Inclination:Have evidence that these individuals have a reputation forgiving in the high five, six or seven figure range.

    Keep in mind that people should be selected who are not only major donor prospects,but also people to whom you can look for active leadership in the campaign. Identifypeople who have networks with peers with similar financial capabilities. Sometimesthese networks will be geared to a particular business or a type of business. In othercases the network will relate to family and social ties.

    In terms of networks, we are not talking simply about relationships, but about peoplewho have used their networks to help benefit a nonprofit or church in a substantialway. We are looking for major donors who have a generous heart and have experiencein giving and inviting others to do what they have done at the level at which they have

    participated.

    Categorizing respondents.With these thoughts in mind, the categories of respondents are as follows: (80% ofpotential interviewees should fall in categories 1 and 2.)

    1. Major donors (current or lapsed) and prospective campaign leadersThese should be individuals who are known to have assets in the multiplemillions and have used their resources to give gifts to nonprofits or the churchtotaling in the high five or mid-to upper six figures. Hopefully, a few have givenseven-figure gifts.

    This category should include individuals who not only are substantial givers buthave the reputation for going to their peers and inviting them to do what theyhave already done themselves.

    Of the top donor categories, this one should have the majority of respondents.

  • 8/12/2019 FS Setup Manual - BUM

    12/29

    10

    2. Major donors (current or lapsed)

    These are donors who give very substantial gifts, but are not known to takeleadership or participate in asking their peers to give.

    3. Influential friends and prospective friends

    This category includes individuals who are not major donor prospects, but whoare influential as community, church or civic leaders and/or who serve onfoundation or corporate boards.

    4. Focus Groups

    These should be affinity groups that have a stake in the success of the campaign(alumni, staff, and other must interviewees with limited financial capacity).

    5. Leadership TeamIt will be important to interview Marta Schellberg as part of the Feasibility Study.

  • 8/12/2019 FS Setup Manual - BUM

    13/29

    11

    GUIDELINES FOR LEADERSHIP TEAMMAKING INITIAL CONTACT

  • 8/12/2019 FS Setup Manual - BUM

    14/29

    12

    GUIDELINES FOR LEADERSHIP TEAM MAKING INITIAL CONTACT

    TFG recommends that top prospects be called in advance by the Leadership Team toinvite them to participate in the feasibility study. Typically these calls will be from thePastor or the highest level staff person with the closest relationship and influence.

    When calling emphasize:

    1. The importance of the proposed campaign forBUMC as a step that will greatlyenhance your movementseffectiveness;

    2. The importance of the capital campaign to achieve the strategic goals;3. How essential it is to the study to get candid opinions, advice and

    recommendations without having to measure one's words or to be concerned

    about someone's feelings (there is no attribution in the feasibility study);

    4. The value of having experienced, objective fundraising counsel collect the dataand formulate recommendations and campaign plans that will best fit and serveBUMCsmission.

    5. Advise that they will be contacted soon by a BUMC staff member (the FSA) toconfirm a date and time for their interview.

  • 8/12/2019 FS Setup Manual - BUM

    15/29

    13

    FEASIBILITY STUDYTIMETABLE

  • 8/12/2019 FS Setup Manual - BUM

    16/29

    14

    Bremerton United Methodist ChurchFeasibility Study Timetable

    TASK March April May June Comments/Assignments

    I. Begin Research and Prepare Case Statement

    1st Draft Case Statement BUMC toassemble draft for TFG review

    BUMC staff prepare casestatement draft with TFGcounsel

    TFG reviews, makes recommendations TFG

    2nd Draft Case Statement for InterviewsBUMC makes revisions inpreparation for interviews

    TFG reviews Final Draft and signs off TFG

    II. Respondents Selection & Invitation (Using compiled interviewee list, schedule 5-6 interviews per day)

    Gather internal data and input allinformation on the Interview Fact Sheets.

    Ongoing Ongoing FSA

    Leadership to call priority respondents toexplain purpose of feasibility study andprepare candidate for phone call from FSA.

    BUMC Leadership Team

    FSA send invitation letters to top preferredrespondents. Goal is to secure 30-35interviews. (A focus group =1 interview)

    Build mailing list, FSA send outinvitation letters.

  • 8/12/2019 FS Setup Manual - BUM

    17/29

    15

    TASK March April May June Comments/Assignments

    III. Preparation and Schedule for Interviews

    Interview Schedule (Consultants need toschedule flights at least two weeks inadvance.)

    CA to provide interview datesto FSA.

    Schedule interviews: Call five business

    days after the invitation letters are sent.Once interview is set, the CA will confirmall interviews with FSA.

    Ongoing Ongoing

    FSA to manage schedule. Emailany changes to CA using theInterview Schedule daily. The CAwill confirm tentativeinterviews.

    FSA sends letter to confirm interview date,time and place, along with case statementdraft. Send one week before interview. Callto confirm receipt of materials and toconfirm interview 3 daysprior to visit.

    Ongoing Ongoing FSA

    Complete Interview Fact Sheetfor eachrespondent before the interview and sendto the CA one week in advance of

    interview.

    Ongoing OngoingFSA ensuresfact sheetsare fullycompleted.

    Interviewing approximately 30-35respondents personally, averaging five tosix (5-6) interviews per day and preparingthe data for analysis.

    TFG

  • 8/12/2019 FS Setup Manual - BUM

    18/29

    16

    TASK March April May June Comments/Assignments

    IV. Institutional Data Gathering

    Complete Institutional Data Reportsusingelectronic forms for: Giving by Boardmembers, Organization three yeargiving history, Foundation Giving.

    FSA

    Submit Institutional Data Reports

    electronically to TFG. FSA

    V. Follow Up to Interviews

    TFG Consultants report wheninterviews are completed. CA notifiesFSA to send thank you letter.

    Ongoing OngoingTFG ConsultantsCA

    Send thank you letter, with promise ofExecutive Summary Report after Boardsreview and action.

    Ongoing OngoingFSA to send out letters followinginterviews.

    VI. Report Review Conference CallPastor and other BUMCLeadership with TFG Consultants

    VII. Submission of Feasibility Study Report

    Present FS report to BUMC Board. TFG Representatives

    Following presentation of the report toBoard.

    TFG advises on preparation ofExecutive Summary Report

    Send each respondent an ExecutiveSummary Report with cover letter.

    TBD

    FSA to send out ExecutiveSummary Reportwith cover letterannouncing board action torespondents

  • 8/12/2019 FS Setup Manual - BUM

    19/29

    17

    SAMPLE DOCUMENTSINTERVIEW SCHEDULEINTERVIEW FACT SHEETSAMPLE LETTERS

  • 8/12/2019 FS Setup Manual - BUM

    20/29

    18

    SAMPLE INTERVIEW SCHEDULE

    Interview Schedule

    Date Time Consultant Name Location Contact info NotesPrio

    (1-

    2/288:00AM

    Kristina Bill and Barbara JonesStarbucks Coffee 123 Sesame Street,Anytown, IN 32788

    Cell: 677-345-0000Email:[email protected]

    1

    2/28 9:30AM

    Kristina Joe Smith His office: Sears Building 658 12thAve, Suite A, Anytown, IN 32788

    Office: 677-345-9293Assts name is Joan

    Office ison 3rdfloor

    1

    3/113:00PM

    Andy George and Jillian ClarkTheir home: 5 Sparrow Lane, Chicago,IL 55590

    Home: 589-990-7676Jillians cell: 589-993-0988

    Park onthe street

    1

    3/115:30PM

    Andy Bob HamptonDinner @ The Chart House: 314 TownsDrive, Chicago, IL 55590

    Restaurant: 589-098-0045Cell: 589-444-9821

    2

    3/128:15AM

    Andy Valarie JohnsonPanera Coffee shop: 678 1stAve,Chicago, IL 47859

    Cell: 674-987-0321Panera: 589-234-0986

    1

    Letters

    Invitation Confirm Thank You Summary

    personal call by Rev. Marta,

    Pastor 3/12 Sent 3/16 Sent 3/30 Delivered 4/5

    personal call by Rev. Marta,Pastor 3/13

    Sent 3/16 Sent 3/30 Delivered 4/5

    personal call by ElderRobert, 3/21

    Sent 3/24 Sent 3/31 Delivered 4/7

    personal call by ElderRobert, 3/22

    Sent 3/24 Sent 3/31 Delivered 4/7

    personal call by ElderRobert, 3/23

    Sent 3/24 Sent 3/31 Delivered 4/7

    mailto:[email protected]:[email protected]
  • 8/12/2019 FS Setup Manual - BUM

    21/29

    19

    FEASIBILITY STUDYINTERVIEW FACT SHEET

    Date: The FOCUS Group Consultant: ...........

    Respondents Name:Phone at

    Interview:Interview Time: Interview Date:

    Cell phone:

    Interview Address (If a business or restaurant, include name and/or name of building. If ahome, please note):

    Interview Category:(Please Bold)

    Major Donor Board Previous Church Member

    Leadership Team Church Member/Attender Other___________

    Key information/comments aboutrespondent: priority,closest contact,history withorganization, etc.

    History of giving: Amount Designation(s)

    2013

    2012

    2011

    Giving capability to proposed campaign: (Please project gift range below & any specific details)

    High Projectionover 3 years

    Low projectionover 3 years

    Details

    $ ___________ $ ___________

    Has this interviewee documented a planned gift to your institution: If so,When or currently in process:

    Describe type of planned gift:

    Estimated Value:

    Known major gifts to other nonprofits, current or past, especially to similarorganizations/projects:

    Projected campaign leadership role:

  • 8/12/2019 FS Setup Manual - BUM

    22/29

    20

    Interview Invitation Letter(Lower tiered prospects)

    S A M P L E

    [Date]

    Dear Mr. Smith:

    [Introductory paragraph with ministry highlights]. The Board has approved a feasibilitystudy for a capital campaign to

    I want to personally invite you, along with a few others, within the next four weeks toreview a confidential draft of our case statement outlining the proposed campaign forBremerton United Methodist Church. After you receive and review these materials, Iam asking you to take an hour to participate in a formal interview setting andconfidentially discuss Bremerton United Methodist Churchs proposed campaign.

    I believe it is important to emphasize two things. First, this is not a meeting at whichyou will be asked to make a gift; however, the interviewer will confidentially discussyour potential level of support for this new effort. Second, your comments and views on

    Bremerton United Methodist Churchand its proposed campaign will be keptconfidential, and the results of the meetings with you and others will be reportedanonymously.

    Our [leadership -- use appropriate term, i.e. Board and Administration] have asked TheFOCUS Group, Inc. to conduct these interviews and then to prepare a report withrecommendations. [Someone representing BUMC] will be calling you to invite yourparticipation in this very important interview process and to schedule your individualinterview.

    Your taking the time to adviseBremerton United Methodist Churchthrough thisfeasibility study will be extraordinarily helpful. Your insight and advice will beinvaluable to us as we plan what is best for Bremerton United Methodist Church.

    Cordially yours [or preferred sign-off],

    [Appropriate BUMC Staff Member]Title

  • 8/12/2019 FS Setup Manual - BUM

    23/29

    21

    Interview Confirmation Letter (email)

    S A M P L E

    [Date]

    Dear Mr. Smith:

    Thank you for agreeing to participate in the feasibility study forBremerton United

    Methodist Churchsproposed capital campaign. Enclosed is a draft of the CaseStatement. Please review this material in detail in preparation for your interview. Yourinterview is scheduled to take place [date] [time] at [place] with [consultant name].

    I would like to re-emphasize two things. First, this is not a meeting at which you willbe asked to make a gift; however, the interviewer will confidentially discuss yourpotential level of support for this new effort. Second, your comments and views onBremerton United Methodist Churchand its proposed campaign will be keptconfidential. The results of the meetings with you and others will be reportedanonymously.

    Our board has asked The FOCUS Group, Inc. to conduct these interviews and prepare areport with recommendations.

    I am very grateful to you for taking your valuable time to advise Bremerton UnitedMethodist Church through this interview process.

    Cordially yours [or preferred sign-off],

    [Appropriate BUMC Staff Member]Title

    P.S. If there is a last minute change to your schedule, please contact The FOCUS Groupconsultant [place consultants name and cell phone number here]

  • 8/12/2019 FS Setup Manual - BUM

    24/29

  • 8/12/2019 FS Setup Manual - BUM

    25/29

    23

    Follow-up Letter with Executive Summary

    S A M P L E

    [date]

    Dear Mr. Smith:

    This [winter] you shared your time generously with Bremerton United MethodistChurch by participating in our feasibility study for our proposed campaign. Your gift oftime and interest is greatly appreciated, and I would like to take this opportunity onceagain to thank you for your insights and ideas regarding our proposed campaign.

    As promised, I am pleased to share with you the Executive Summary of the feasibilitystudy report, prepared for us by The FOCUS Group. Since you care deeply aboutBremerton United Methodist Church, I am sure you will find this Executive Summaryto be encouraging.

    If, while reading this report, you find that you have questions or additional commentsthat you would like to share, please call me at xxx-xxx-xxxx (direct line if appropriate). Iwould appreciate hearing from you.

    You will also be pleased to know, [or,] as you already know the board has voted to

    Thank you again for your time and your support. It is an exciting time for all of us atBremerton United Methodist Church.

    [signoff],

    [Pastor]

  • 8/12/2019 FS Setup Manual - BUM

    26/29

    24

    INSTITUTIONAL DATA INSTRUCTIONS

  • 8/12/2019 FS Setup Manual - BUM

    27/29

    25

    Feasibility Study - Institutional Data

    The Feasibility Study Report will include a number of specific recommendations related

    to the case, campaign goal, donor prospects, organizational structure, campaignmanagement, etc. By providing the material requested below the analysis andrecommendations in the report will be more tightly focused on the specific next stepsand strategies needed for a successful campaign.

    Direct any questions about these forms and provide electronic copies of the reports andother documents to Travis Stevens [email protected].

    The Board and Development

    1. Please provide the following:a. The number of Board members.b. A list of all Board standing committees with committee job

    descriptions/purpose statements.

    2. Report each of the last three years of board giving indicating the totals given toannual fund, special projects, endowment, etc. Please indicate the percentage ofparticipation by fund/project and the total dollar amounts by project or fund.

    *An electronic form titled Giving by Board Members will be provided.

    Donor History

    1. Please provide a list of the top 100 donors (do not include deceased donors). Pleaselist in descending order from highest to lowest based on total lifetime giving.

    *An electronic form titled Top Donor List will be provided.

    2. Report separately for each of the previous three years the giving to the annual fund,special projects, and planned gifts indicating the goal, amount received andsubtotals for amounts received in each year by donor constituency.

    *An electronic form titled Three-year Giving History will be provided.

    3. Provide the giving history for any previous capital campaigns in the past ten years.*An electronic form titled Previous Campaign History will be provided.

  • 8/12/2019 FS Setup Manual - BUM

    28/29

    26

    FEASIBILITY STUDY ASSOCIATE (FSA)JOB DESCRIPTION

    The Bremerton United Methodist Church Feasibility Study Associate (FSA) managesthe administrative portion of the interview process and acts as the liaison betweenBUMC and TFG. This person must be detail oriented and successful at multitasking.Experience in managing complex scheduling processes is valuable.

    The FSA plays a critical role primarily during the set up phase of the feasibility study,and the intensity of the work continues for approximately four weeks. The FSA willmaintain close contact with a Consultant Associate (CA*) at TFG over the course of thisperiod. During this crucial set up phase, contact will most likely be on a daily basis.The FSA must have a professional rapport, especially on the phone (99% of contact withrespondents during the set up phase is over the phone.) This phone contact is importantas it can leave a lasting impression and set the tone for the respondents experiences

    throughout the feasibility study.

    Responsibilities include:

    1. Review list of prioritized potential respondents prepared by Leadership Team.2. Fill out Research Request Formsand submit to TFG.3. Enter all names, cities, states, giving history and occupation into theFeasibility

    Interview Schedule.These interviewees include major donors (current and lapsed),present and former board members, present and former church members, andleadership team.

    4. Establish this list in consultation with the Leadership Team and submit to CA forTFG Consultants.

    5. UpdateInterview Schedulecontinually and email to CA whenever there is achange.

    6. Prepare and mail Invitation Lettersto preselected respondents.7. FSA calls respondents after they have been called by a member of the Leadership

    Team or five days after they receive the Invitation Letter. Once these calls havebeen made, notify the CA that the scheduling process has begun.

    8. Schedule tentative interview dates and times with respondents according toTFGs pre-determined dates. CA will confirm following daily emails from theFSA of the Interview Schedule.

    9. Schedule focus groups. It is preferred to have 6 to 8 persons in each focus group.Each focus group counts as one interview.

    10.Complete the Interview Fact Sheets, soliciting data from key staff or departmentsas appropriate, and email to the CA with specific directions to location ofinterview, at least one week in advance; ensuring that all pertinent data is noted.

  • 8/12/2019 FS Setup Manual - BUM

    29/29

    11.Prepare and mail Interview Confirmation Lettersto respondents when interviewshave been confirmed, including a copy of the draft of the Case Statementfor theirreview.

    (Note: It is a good idea to check with the respondents regarding how they would prefer to receivethis material. Faxing or emailing has worked in the past as an alternative to sending a hard copy

    in the mail, if this is what the respondents prefer. Occasionally, the respondents will accidentallytoss materials that are sent via regular mail, especially if they are not specifically looking forthem.)

    12.Arrange for Institutional Data Formsto be completed and sent to TFG staff.13.Make follow up calls to respondents a few days before each interview is to take

    place. Confirm receipt of Confirmation Letterand draft of the Case Statement, andconfirm the details of the interview appointment. If respondents make ANYchange in interview details, contact CA immediately. Encourage respondent tocontact the consultant directly if time is of the essence and give them theconsultants cell number.

    14.Prepare and mail the Thank you Lettersto respondents on a weekly basis as soonas interviews are completed.

    15.Prepare and send the Follow up Letterswhich will include the boards actions torespondents and enclose copies of the Executive Summaryfrom the feasibilitystudy report.

    *CA for The FOCUS Group