M. Fross: 35 years of application of micropiles in Austria IWM 2006 - Schrobenhausen, Germany May 3-7, 2006 1 THIRTYFIVE YEARS OF THIRTYFIVE YEARS OF APPLICATION OF APPLICATION OF MICROPILES IN AUSTRIA MICROPILES IN AUSTRIA Manfred FROSS Manfred FROSS Dipl. Dipl. - - Ing. Ing. Dr.techn Dr.techn ., ., Ass.Prof.i.R Ass.Prof.i.R . . Geotechnical Geotechnical Consultant Consultant Vienna Vienna , , Austria Austria

Fross - THIRTYFIVE YEARS OF APPLICATION OF ... - Fross...2006/04/28  · the south and southeast of the city of Vienna, close to Vienna International Airport Schwechat. Construction

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Fross - THIRTYFIVE YEARS OF APPLICATION OF ... - Fross...2006/04/28  · the south and southeast of the city of Vienna, close to Vienna International Airport Schwechat. Construction

M. Fross: 35 years of application of micropiles in Austria

IWM 2006 - Schrobenhausen, Germany May 3-7, 2006 1

THIRTYFIVE YEARS OF THIRTYFIVE YEARS OF APPLICATION OF APPLICATION OF

MICROPILES IN AUSTRIAMICROPILES IN AUSTRIA

Manfred FROSSManfred FROSSDipl.Dipl.--Ing. Ing. Dr.technDr.techn., ., Ass.Prof.i.RAss.Prof.i.R. .

GeotechnicalGeotechnical ConsultantConsultantViennaVienna, , AustriaAustria

Page 2: Fross - THIRTYFIVE YEARS OF APPLICATION OF ... - Fross...2006/04/28  · the south and southeast of the city of Vienna, close to Vienna International Airport Schwechat. Construction

M. Fross: 35 years of application of micropiles in Austria 2

IWM 2006 - Schrobenhausen, Germany May 3-7, 2006

CONTENTSCONTENTS

IntroductionIntroductionTypesTypes of of micropilesmicropiles usedused in in AustriaAustria,,8 8 examplesexamples of of applicationsapplications of of micropilesmicropiles in in AustriaAustria betweenbetween 1971 and 20051971 and 2005ActivitiesActivities in in AustriaAustria to to promotepromote thethe useuse of of micropilesmicropilesClosingClosing remarksremarks

Page 3: Fross - THIRTYFIVE YEARS OF APPLICATION OF ... - Fross...2006/04/28  · the south and southeast of the city of Vienna, close to Vienna International Airport Schwechat. Construction

M. Fross: 35 years of application of micropiles in Austria 3

IWM 2006 - Schrobenhausen, Germany May 3-7, 2006

TypesTypes of of micropilesmicropiles

usedused in in AustriaAustria in in thethe

periodperiod firstfirstfromfrom 1971 1971 untiluntil

aboutabout 1980 1980

Page 4: Fross - THIRTYFIVE YEARS OF APPLICATION OF ... - Fross...2006/04/28  · the south and southeast of the city of Vienna, close to Vienna International Airport Schwechat. Construction

M. Fross: 35 years of application of micropiles in Austria 4

IWM 2006 - Schrobenhausen, Germany May 3-7, 2006

8 8 examplesexamples of of applicationapplication of of micropilesmicropiles in in AustriaAustria 1971 1971 -- 20052005

1) 1) KläranalageKläranalage GÜSSING/Burgenland 1971/72GÜSSING/Burgenland 1971/722) ÖBB2) ÖBB--Brücke Südtirolerplatz Brücke Südtirolerplatz ––U 1/U 1/ViennaVienna 1972/731972/733) Haus REISCH Schwarzsee bei KITZBÜHEL/3) Haus REISCH Schwarzsee bei KITZBÜHEL/TyrolTyrol 1974/751974/754) Halle DONAUPLASTIK 4) Halle DONAUPLASTIK AuhofAuhof//ViennaVienna 1976/771976/775) Freibad WILDSCHÖNAU/5) Freibad WILDSCHÖNAU/TyrolTyrol 1979/801979/806) Waldsiedlung BISAMBERG/6) Waldsiedlung BISAMBERG/LowerLower AustriaAustria 1992/941992/947) Kurzentrum BAD SAUERBRUNN/Burgenland 2001/027) Kurzentrum BAD SAUERBRUNN/Burgenland 2001/028) Tunnel RANNERSDORF S 1/8) Tunnel RANNERSDORF S 1/LowerLower AustriaAustria 2004/052004/05ExamplesExamples 1 to 3: Type “Wurzelpfahl“, 1 to 3: Type “Wurzelpfahl“, examplesexamples 4 to 6: Type 4 to 6: Type

GEWIGEWI--pilespiles, , ExampleExample 7: 7: typetype DUKTIlDUKTIl--pilespiles, , exampleexample 8: 8: GEWIGEWI--tensiontension--pilespiles. .

Page 5: Fross - THIRTYFIVE YEARS OF APPLICATION OF ... - Fross...2006/04/28  · the south and southeast of the city of Vienna, close to Vienna International Airport Schwechat. Construction

M. Fross: 35 years of application of micropiles in Austria 5

IWM 2006 - Schrobenhausen, Germany May 3-7, 2006

EXAMPLE No. 1EXAMPLE No. 1

A A newnew sewagesewage tank of Kläranlage tank of Kläranlage GÜSSING/Burgenland (10 m GÜSSING/Burgenland (10 m diameterdiameter, 13 m high) , 13 m high) was was builtbuilt withoutwithout anyany soilsoil investigationinvestigation, , foundedfounded on a on a spreadspread foundationfoundation ((slabslab). ). After a After a firstfirst test test fillingfilling withwith waterwater an an inclinationinclination withwith a a differential differential settlementsettlement of 25 cm of 25 cm occuredoccured..SupplementarySupplementary investigationinvestigation boringsborings showedshowed a a layerlayer of of peatpeat in in oneone boreholeborehole in a in a depthdepth of 7 m to 8 m.of 7 m to 8 m.Rehabilitation (Rehabilitation (underpinningunderpinning) was ) was performedperformed byby 16 16 micropilesmicropiles ((typetype Wurzelpfahl), Wurzelpfahl), thethe firstfirst applicationapplication of of micropilesmicropiles in in AustriaAustria, , executionexecution in in winterwinter 1972.1972.

Page 6: Fross - THIRTYFIVE YEARS OF APPLICATION OF ... - Fross...2006/04/28  · the south and southeast of the city of Vienna, close to Vienna International Airport Schwechat. Construction

M. Fross: 35 years of application of micropiles in Austria 6

IWM 2006 - Schrobenhausen, Germany May 3-7, 2006

SectionSection throughthrough thethe sewagesewage tank tank withwith differntialdifferntial settlementssettlements of 25 cmof 25 cm

Page 7: Fross - THIRTYFIVE YEARS OF APPLICATION OF ... - Fross...2006/04/28  · the south and southeast of the city of Vienna, close to Vienna International Airport Schwechat. Construction

M. Fross: 35 years of application of micropiles in Austria 7

IWM 2006 - Schrobenhausen, Germany May 3-7, 2006

ResultsResults of 2 of 2 supplementarysupplementary

boringsborings

Page 8: Fross - THIRTYFIVE YEARS OF APPLICATION OF ... - Fross...2006/04/28  · the south and southeast of the city of Vienna, close to Vienna International Airport Schwechat. Construction

M. Fross: 35 years of application of micropiles in Austria 8

IWM 2006 - Schrobenhausen, Germany May 3-7, 2006

Rehabilitation of Rehabilitation of thethe sewagesewage tank tank withwith16 16 micropilesmicropiles ((typetype „Wurzelpfahl“)„Wurzelpfahl“)

Page 9: Fross - THIRTYFIVE YEARS OF APPLICATION OF ... - Fross...2006/04/28  · the south and southeast of the city of Vienna, close to Vienna International Airport Schwechat. Construction

M. Fross: 35 years of application of micropiles in Austria 9

IWM 2006 - Schrobenhausen, Germany May 3-7, 2006

Page 10: Fross - THIRTYFIVE YEARS OF APPLICATION OF ... - Fross...2006/04/28  · the south and southeast of the city of Vienna, close to Vienna International Airport Schwechat. Construction

M. Fross: 35 years of application of micropiles in Austria 10

IWM 2006 - Schrobenhausen, Germany May 3-7, 2006

EXAMPLE No. 2EXAMPLE No. 2TheThe footingsfootings of a of a railwayrailway bridgebridge in VIENNA in VIENNA closecloseto „Südbahnhof“ to „Südbahnhof“ werewere strengthenedstrengthened byby micropilesmicropiles((typetype Wurzelpfahl) Wurzelpfahl) priorprior to to tunnelingtunneling worksworks of of ViennaVienna metrometro lineline U 1 (U 1 (tunneltunnel constructionconstruction of of thethe2 2 tubestubes withwith BADE BADE shieldshield machinemachine) in 1972/73.) in 1972/73.ItIt was was thethe firstfirst applicationapplication of of micropilesmicropiles forfora a publicpublic buildingbuilding in a in a cooperationcooperation of of thethe buildingbuildingauthoritiesauthorities of of ViennaVienna withwith AustrianAustrian railwaysrailways (ÖBB).(ÖBB).DisplacementsDisplacements duringduring pilingpiling and and tunnelingtunneling worksworkswerewere onlyonly 4 mm to 7 mm.4 mm to 7 mm.

Page 11: Fross - THIRTYFIVE YEARS OF APPLICATION OF ... - Fross...2006/04/28  · the south and southeast of the city of Vienna, close to Vienna International Airport Schwechat. Construction

M. Fross: 35 years of application of micropiles in Austria 11

IWM 2006 - Schrobenhausen, Germany May 3-7, 2006

Cross Cross sectionsectionthroughthrough thetherailwayrailway bridgebridgeand and thethe metrometrotunnelstunnels of U 1 of U 1

Time Time ––settlementsettlementbehaviourbehaviour duringduringpilingpiling and and tunnelingtunneling worksworks

Page 12: Fross - THIRTYFIVE YEARS OF APPLICATION OF ... - Fross...2006/04/28  · the south and southeast of the city of Vienna, close to Vienna International Airport Schwechat. Construction

M. Fross: 35 years of application of micropiles in Austria 12

IWM 2006 - Schrobenhausen, Germany May 3-7, 2006

EXAMPLE No. 3EXAMPLE No. 3A A newnew househouse (double (double bungalowbungalow) ) nearnearKITZBÜHEL/KITZBÜHEL/TyrolTyrol closeclose to to lakelake SCHWARZSEE SCHWARZSEE builtbuilt 1974 was 1974 was foundedfounded on a on a spreadspread foundationfoundation((reinforcedreinforced concreteconcrete slabslab d = 30 cm) on a d = 30 cm) on a compactedcompactedfillfill of of coarsecoarse material. No material. No soilsoil investigationsinvestigations werewere donedone. . Just Just beforebefore finishingfinishing thisthis househouse differential differential settlementssettlementsof of aboutabout 35 cm (!) 35 cm (!) occuredoccured..SupplementarySupplementary soilsoil investigationinvestigation showedshowed a a lenselense--likelikelayerlayer of of veryvery soft soft peatpeat betweenbetween a a depthdepth of 3 m to 5 m.of 3 m to 5 m.Rehabilitation (Rehabilitation (underpinningunderpinning ) was ) was performedperformed 1975 1975 byby21 21 micropilesmicropiles ((typetype Wurzelpfahl), Wurzelpfahl), boredbored throughthrough thethefoundationfoundation slabslab. .

Page 13: Fross - THIRTYFIVE YEARS OF APPLICATION OF ... - Fross...2006/04/28  · the south and southeast of the city of Vienna, close to Vienna International Airport Schwechat. Construction

M. Fross: 35 years of application of micropiles in Austria 13

IWM 2006 - Schrobenhausen, Germany May 3-7, 2006

Page 14: Fross - THIRTYFIVE YEARS OF APPLICATION OF ... - Fross...2006/04/28  · the south and southeast of the city of Vienna, close to Vienna International Airport Schwechat. Construction

M. Fross: 35 years of application of micropiles in Austria 14

IWM 2006 - Schrobenhausen, Germany May 3-7, 2006

TimeTime--dependantdependant settlementsettlement--behaviourbehaviourof of thethe buildingbuilding beforebefore and and afterafter thethe

underpinningunderpinning withwith micropilesmicropiles

Page 15: Fross - THIRTYFIVE YEARS OF APPLICATION OF ... - Fross...2006/04/28  · the south and southeast of the city of Vienna, close to Vienna International Airport Schwechat. Construction

M. Fross: 35 years of application of micropiles in Austria 15

IWM 2006 - Schrobenhausen, Germany May 3-7, 2006

EXAMPLE No. 4EXAMPLE No. 4

An An newnew industrialindustrial buildingbuilding in in ViennaVienna ((prefabricatedprefabricatedreinforcedreinforced concreteconcrete elementselements) ) foundedfounded on on ratherrather smallsmallsinglesingle footingsfootings showedshowed differential differential settlementssettlements alreadyalreadyduringduring constructionconstruction workwork..A A looseloose fillfill of of coursecourse soilsoil material (material (sandysandy gravelgravel) was ) was notnot recognizedrecognized as a as a fillfill becausebecause of of insufficientinsufficient inin--situsitusoilsoil investigationinvestigation..Rehabilitation (Rehabilitation (underpinningunderpinning) was ) was performedperformed bybymicropilesmicropiles 1976/77. 1976/77. ItIt was was thethe firstfirst applicationapplication of of thethetypetype GEWIGEWI--pilepile in in AustriaAustria. .

Page 16: Fross - THIRTYFIVE YEARS OF APPLICATION OF ... - Fross...2006/04/28  · the south and southeast of the city of Vienna, close to Vienna International Airport Schwechat. Construction

M. Fross: 35 years of application of micropiles in Austria 16

IWM 2006 - Schrobenhausen, Germany May 3-7, 2006

Page 17: Fross - THIRTYFIVE YEARS OF APPLICATION OF ... - Fross...2006/04/28  · the south and southeast of the city of Vienna, close to Vienna International Airport Schwechat. Construction

M. Fross: 35 years of application of micropiles in Austria 17

IWM 2006 - Schrobenhausen, Germany May 3-7, 2006

Equipment Equipment forfor thetheinstallationinstallation of of thethe

GEWIGEWI--pilespiles in in 1976/771976/77

Page 18: Fross - THIRTYFIVE YEARS OF APPLICATION OF ... - Fross...2006/04/28  · the south and southeast of the city of Vienna, close to Vienna International Airport Schwechat. Construction

M. Fross: 35 years of application of micropiles in Austria 18

IWM 2006 - Schrobenhausen, Germany May 3-7, 2006

EXAMPLE No. 5EXAMPLE No. 5Freischwimmbad WILDSCHÖNAU/Freischwimmbad WILDSCHÖNAU/TyrolTyrol builtbuilt1978/79 1978/79 withoutwithout anyany soilsoil investigationinvestigation on on spreadspreadfootingsfootings onlyonly withwith an an exchangeexchange of of thethe upperupper soilsoil layerslayersagainstagainst a a veryvery coarsecoarse fillfill of of crushedcrushed rock material.rock material.2 2 swimmingswimming poolspools showedshowed differential differential settlementssettlements of of moremore 25 and 30 cm , a 25 and 30 cm , a restaurantrestaurant buildingbuilding aboutabout 18 cm.18 cm.SupplementarySupplementary investigationinvestigation boringsborings showedshowed layerslayers of of peatpeat to a to a depthdepth of 12 m of 12 m belowbelow thethe surfacesurface..Rehabilitation of Rehabilitation of thethe swimmingswimming poolspools ((stainlessstainless steelsteel) ) was was performedperformed byby drivendriven precastprecast reinforcedreinforced concreteconcretepilespiles, , rehabilitationrehabilitation ((underpinningunderpinning) of ) of thethe restaurantrestaurantbuildingbuilding was was performedperformed byby micropilesmicropiles ((typetype GEWIGEWI--pilepilewithwith double double corrosioncorrosion protectionprotection) in ) in winterwinter 1979/80. 1979/80.

Page 19: Fross - THIRTYFIVE YEARS OF APPLICATION OF ... - Fross...2006/04/28  · the south and southeast of the city of Vienna, close to Vienna International Airport Schwechat. Construction

M. Fross: 35 years of application of micropiles in Austria 19

IWM 2006 - Schrobenhausen, Germany May 3-7, 2006

Page 20: Fross - THIRTYFIVE YEARS OF APPLICATION OF ... - Fross...2006/04/28  · the south and southeast of the city of Vienna, close to Vienna International Airport Schwechat. Construction

M. Fross: 35 years of application of micropiles in Austria 20

IWM 2006 - Schrobenhausen, Germany May 3-7, 2006

TimeTime--dependantdependant settlementsettlementbehaviourbehaviour beforebefore and and afterafter

underpinningunderpinning withwith GEWIGEWI--pilespiles..

Page 21: Fross - THIRTYFIVE YEARS OF APPLICATION OF ... - Fross...2006/04/28  · the south and southeast of the city of Vienna, close to Vienna International Airport Schwechat. Construction

M. Fross: 35 years of application of micropiles in Austria 21

IWM 2006 - Schrobenhausen, Germany May 3-7, 2006

Installation of Installation of thethe GEWIGEWI--pilespiles

in in winterwinter 1979/801979/80

Page 22: Fross - THIRTYFIVE YEARS OF APPLICATION OF ... - Fross...2006/04/28  · the south and southeast of the city of Vienna, close to Vienna International Airport Schwechat. Construction

M. Fross: 35 years of application of micropiles in Austria 22

IWM 2006 - Schrobenhausen, Germany May 3-7, 2006

EXAMPLE No. 6EXAMPLE No. 6

Waldsiedlung BISAMBERG/NÖ Waldsiedlung BISAMBERG/NÖ northnorth of of ViennaVienna, , builtbuilt 1992 1992 withoutwithout anyany soilsoil investigationinvestigation..2 2 newnew houseshouses on on spreadspread foundationsfoundations showedshoweddifferential differential settlementssettlements of 12 cm and 5 cm and a lot of of 12 cm and 5 cm and a lot of crackscracks. . ThisThis settlementssettlements werewere causedcaused byby a a smallsmall naturalnaturaltrenchtrench filledfilled withwith looseloose, , partlypartly organicorganic material (material (rootsrootsetc.) etc.) withoutwithout anyany compactioncompaction..Rehabilitation (Rehabilitation (underpinningunderpinning) was ) was performedperformed 1994 1994 bybymicropilesmicropiles ((typetype GEWIGEWI--pilepile) ) withwith specialspecial constructionconstructionof of thethe pilepile headsheads withwith additional additional reinforcementreinforcement ((againstagainstbendingbending momentsmoments) and ) and HILTIHILTI--dowelsdowels stickedsticked withwith a a pastepaste of of syntheticsynthetic resinresin to to thethe existingexisting wallswalls. .

Page 23: Fross - THIRTYFIVE YEARS OF APPLICATION OF ... - Fross...2006/04/28  · the south and southeast of the city of Vienna, close to Vienna International Airport Schwechat. Construction

M. Fross: 35 years of application of micropiles in Austria 23

IWM 2006 - Schrobenhausen, Germany May 3-7, 2006

GroundGround plan of plan of thethe houseshouses

Page 24: Fross - THIRTYFIVE YEARS OF APPLICATION OF ... - Fross...2006/04/28  · the south and southeast of the city of Vienna, close to Vienna International Airport Schwechat. Construction

M. Fross: 35 years of application of micropiles in Austria 24

IWM 2006 - Schrobenhausen, Germany May 3-7, 2006

Page 25: Fross - THIRTYFIVE YEARS OF APPLICATION OF ... - Fross...2006/04/28  · the south and southeast of the city of Vienna, close to Vienna International Airport Schwechat. Construction

M. Fross: 35 years of application of micropiles in Austria 25

IWM 2006 - Schrobenhausen, Germany May 3-7, 2006

EXAMPLE No. 7EXAMPLE No. 7

FoundationFoundation of a of a newnew buildingbuilding of of sanatoriumsanatoriumKurzentrum Bad Kurzentrum Bad SauerbrunnSauerbrunn/Burgenland /Burgenland on on DUKTILDUKTIL--PilesPiles 2001/2002.2001/2002.SoilSoil conditionsconditions werewere ratherrather difficultdifficult: : youngyoung depositsdepositswithwith intermediateintermediate layerslayers of of peatpeat an soft an soft siltsilt..HigherHigher existingexisting buildingsbuildings werewere foundedfounded on large on large diameterdiameter boredbored pilespiles aboutabout 25 25 yearsyears agoago. . A A flatflat buildingbuilding of of thisthis sanatoriumsanatorium was was foundedfounded on on a a spreadspread foundationfoundation and and hadhad to to bebe underpinnedunderpinned bybymicropilesmicropiles ((typetype „„ROPRESSROPRESS--PilePile“) “) afterafter differential differential settlementssettlements of of moremore thanthan 12 cm 12 cm alreadyalready soonsoon afterafterconstructionconstruction in 1984. in 1984.

Page 26: Fross - THIRTYFIVE YEARS OF APPLICATION OF ... - Fross...2006/04/28  · the south and southeast of the city of Vienna, close to Vienna International Airport Schwechat. Construction

M. Fross: 35 years of application of micropiles in Austria 26

IWM 2006 - Schrobenhausen, Germany May 3-7, 2006

Elements of Elements of thetheDUKTIL DUKTIL –– PilePile,,

drivingdriving machinemachine withwithhigh high speedspeed --hydraulichydraulic hammerhammer

Page 27: Fross - THIRTYFIVE YEARS OF APPLICATION OF ... - Fross...2006/04/28  · the south and southeast of the city of Vienna, close to Vienna International Airport Schwechat. Construction

M. Fross: 35 years of application of micropiles in Austria 27

IWM 2006 - Schrobenhausen, Germany May 3-7, 2006

DUKTIL DUKTIL –– PilePile ((displacementdisplacement pilepile))diametersdiameters, , thicknessthickness of of wallswalls of of thethe

tubestubes, , designdesign loadsloads

Page 28: Fross - THIRTYFIVE YEARS OF APPLICATION OF ... - Fross...2006/04/28  · the south and southeast of the city of Vienna, close to Vienna International Airport Schwechat. Construction

M. Fross: 35 years of application of micropiles in Austria 28

IWM 2006 - Schrobenhausen, Germany May 3-7, 2006

Page 29: Fross - THIRTYFIVE YEARS OF APPLICATION OF ... - Fross...2006/04/28  · the south and southeast of the city of Vienna, close to Vienna International Airport Schwechat. Construction

M. Fross: 35 years of application of micropiles in Austria 29

IWM 2006 - Schrobenhausen, Germany May 3-7, 2006

Page 30: Fross - THIRTYFIVE YEARS OF APPLICATION OF ... - Fross...2006/04/28  · the south and southeast of the city of Vienna, close to Vienna International Airport Schwechat. Construction

M. Fross: 35 years of application of micropiles in Austria 30

IWM 2006 - Schrobenhausen, Germany May 3-7, 2006

EXAMPLE No. 8EXAMPLE No. 8Tunnel Tunnel RannersdorfRannersdorf, , aboutabout 1,9 km in 1,9 km in lengthlength, , partpart of of newnew highwayhighway S 1 „Wiener Außenring Schnellstraße“ in S 1 „Wiener Außenring Schnellstraße“ in thethe southsouth and and southeastsoutheast of of thethe citycity of of ViennaVienna, , closeclose to to ViennaVienna International Airport Schwechat.International Airport Schwechat.Construction of Construction of thethe tunneltunnel in in openopen excavationexcavation withwithsheetsheet pilepile wallswalls, , underwaterunderwater concreteconcrete slabslab, , stabilizedstabilizedagainstagainst upliftuplift duedue to high to high groundwatergroundwater byby micropilesmicropiles((typetype GEWI GEWI tensiontension pilespiles).).ExecutionExecution of of moremore thanthan 1200 GEWI 1200 GEWI pilespiles 2004/2005.2004/2005.TheThe higwayhigway was was openedopened forfor traffictraffic on April 28th, 2006. on April 28th, 2006.

Page 31: Fross - THIRTYFIVE YEARS OF APPLICATION OF ... - Fross...2006/04/28  · the south and southeast of the city of Vienna, close to Vienna International Airport Schwechat. Construction

M. Fross: 35 years of application of micropiles in Austria 31

IWM 2006 - Schrobenhausen, Germany May 3-7, 2006

Page 32: Fross - THIRTYFIVE YEARS OF APPLICATION OF ... - Fross...2006/04/28  · the south and southeast of the city of Vienna, close to Vienna International Airport Schwechat. Construction

M. Fross: 35 years of application of micropiles in Austria 32

IWM 2006 - Schrobenhausen, Germany May 3-7, 2006

Page 33: Fross - THIRTYFIVE YEARS OF APPLICATION OF ... - Fross...2006/04/28  · the south and southeast of the city of Vienna, close to Vienna International Airport Schwechat. Construction

M. Fross: 35 years of application of micropiles in Austria 33

IWM 2006 - Schrobenhausen, Germany May 3-7, 2006

Tunnel Tunnel RannersdorfRannersdorf,,longitudinal longitudinal geologicalgeological--geotechnicalgeotechnical

profileprofile

Page 34: Fross - THIRTYFIVE YEARS OF APPLICATION OF ... - Fross...2006/04/28  · the south and southeast of the city of Vienna, close to Vienna International Airport Schwechat. Construction

M. Fross: 35 years of application of micropiles in Austria 34

IWM 2006 - Schrobenhausen, Germany May 3-7, 2006

Page 35: Fross - THIRTYFIVE YEARS OF APPLICATION OF ... - Fross...2006/04/28  · the south and southeast of the city of Vienna, close to Vienna International Airport Schwechat. Construction

M. Fross: 35 years of application of micropiles in Austria 35

IWM 2006 - Schrobenhausen, Germany May 3-7, 2006

CrossCross--sectionssections of of thethe tunneltunnel

Page 36: Fross - THIRTYFIVE YEARS OF APPLICATION OF ... - Fross...2006/04/28  · the south and southeast of the city of Vienna, close to Vienna International Airport Schwechat. Construction

M. Fross: 35 years of application of micropiles in Austria 36

IWM 2006 - Schrobenhausen, Germany May 3-7, 2006

Model Model accordingaccording to ÖNORM to ÖNORM B 4435B 4435--2:19992:1999--04, 04, SectionSection 8, Fig.16 c)8, Fig.16 c)

Page 37: Fross - THIRTYFIVE YEARS OF APPLICATION OF ... - Fross...2006/04/28  · the south and southeast of the city of Vienna, close to Vienna International Airport Schwechat. Construction

M. Fross: 35 years of application of micropiles in Austria 37

IWM 2006 - Schrobenhausen, Germany May 3-7, 2006

Model Model accordingaccording to DIN 1054:2003to DIN 1054:2003--01, 01, SectionSection 8.5.4, Fig.2, 8.5.4, Fig.2,

forfor a a singlesingle tensiontension pilepile

Page 38: Fross - THIRTYFIVE YEARS OF APPLICATION OF ... - Fross...2006/04/28  · the south and southeast of the city of Vienna, close to Vienna International Airport Schwechat. Construction

M. Fross: 35 years of application of micropiles in Austria 38

IWM 2006 - Schrobenhausen, Germany May 3-7, 2006

Models Models accordingaccording to to

EUROCODE EUROCODE 77--1,1,

SectionSection 7,7,Fig. 7.1Fig. 7.1

Page 39: Fross - THIRTYFIVE YEARS OF APPLICATION OF ... - Fross...2006/04/28  · the south and southeast of the city of Vienna, close to Vienna International Airport Schwechat. Construction

M. Fross: 35 years of application of micropiles in Austria 39

IWM 2006 - Schrobenhausen, Germany May 3-7, 2006

ComparisonComparison of of thethe resultsresults of of thethe designdesignlengthlength of of thethe GEWIGEWI--tensiontension--pilespiles

Page 40: Fross - THIRTYFIVE YEARS OF APPLICATION OF ... - Fross...2006/04/28  · the south and southeast of the city of Vienna, close to Vienna International Airport Schwechat. Construction

M. Fross: 35 years of application of micropiles in Austria 40

IWM 2006 - Schrobenhausen, Germany May 3-7, 2006

Test Test devicedevice forfor loadload teststests to to proveprovethethe pull out pull out resistanceresistance of of GEWIGEWI--pilespiles

Page 41: Fross - THIRTYFIVE YEARS OF APPLICATION OF ... - Fross...2006/04/28  · the south and southeast of the city of Vienna, close to Vienna International Airport Schwechat. Construction

M. Fross: 35 years of application of micropiles in Austria 41

IWM 2006 - Schrobenhausen, Germany May 3-7, 2006

PilePile loadload test test provingproving thethe pull out pull out resistanceresistance of a of a GEWIGEWI--tensiontension pilepile

Page 42: Fross - THIRTYFIVE YEARS OF APPLICATION OF ... - Fross...2006/04/28  · the south and southeast of the city of Vienna, close to Vienna International Airport Schwechat. Construction

M. Fross: 35 years of application of micropiles in Austria 42

IWM 2006 - Schrobenhausen, Germany May 3-7, 2006

ResultResult of a pull out test of a pull out test

Page 43: Fross - THIRTYFIVE YEARS OF APPLICATION OF ... - Fross...2006/04/28  · the south and southeast of the city of Vienna, close to Vienna International Airport Schwechat. Construction

M. Fross: 35 years of application of micropiles in Austria 43

IWM 2006 - Schrobenhausen, Germany May 3-7, 2006

UnderUnder waterwater excavationexcavation

Page 44: Fross - THIRTYFIVE YEARS OF APPLICATION OF ... - Fross...2006/04/28  · the south and southeast of the city of Vienna, close to Vienna International Airport Schwechat. Construction

M. Fross: 35 years of application of micropiles in Austria 44

IWM 2006 - Schrobenhausen, Germany May 3-7, 2006

Page 45: Fross - THIRTYFIVE YEARS OF APPLICATION OF ... - Fross...2006/04/28  · the south and southeast of the city of Vienna, close to Vienna International Airport Schwechat. Construction

M. Fross: 35 years of application of micropiles in Austria 45

IWM 2006 - Schrobenhausen, Germany May 3-7, 2006

Page 46: Fross - THIRTYFIVE YEARS OF APPLICATION OF ... - Fross...2006/04/28  · the south and southeast of the city of Vienna, close to Vienna International Airport Schwechat. Construction

M. Fross: 35 years of application of micropiles in Austria 46

IWM 2006 - Schrobenhausen, Germany May 3-7, 2006

SectionSection of of thethegroundground plan plan forfor

thethe installationinstallation of of thethe GEWIGEWI--pilespiles

Page 47: Fross - THIRTYFIVE YEARS OF APPLICATION OF ... - Fross...2006/04/28  · the south and southeast of the city of Vienna, close to Vienna International Airport Schwechat. Construction

M. Fross: 35 years of application of micropiles in Austria 47

IWM 2006 - Schrobenhausen, Germany May 3-7, 2006

Page 48: Fross - THIRTYFIVE YEARS OF APPLICATION OF ... - Fross...2006/04/28  · the south and southeast of the city of Vienna, close to Vienna International Airport Schwechat. Construction

M. Fross: 35 years of application of micropiles in Austria 48

IWM 2006 - Schrobenhausen, Germany May 3-7, 2006

Page 49: Fross - THIRTYFIVE YEARS OF APPLICATION OF ... - Fross...2006/04/28  · the south and southeast of the city of Vienna, close to Vienna International Airport Schwechat. Construction

M. Fross: 35 years of application of micropiles in Austria 49

IWM 2006 - Schrobenhausen, Germany May 3-7, 2006

DivingDiving devicesdevices

Page 50: Fross - THIRTYFIVE YEARS OF APPLICATION OF ... - Fross...2006/04/28  · the south and southeast of the city of Vienna, close to Vienna International Airport Schwechat. Construction

M. Fross: 35 years of application of micropiles in Austria 50

IWM 2006 - Schrobenhausen, Germany May 3-7, 2006

Divers Divers workingworking

Page 51: Fross - THIRTYFIVE YEARS OF APPLICATION OF ... - Fross...2006/04/28  · the south and southeast of the city of Vienna, close to Vienna International Airport Schwechat. Construction

M. Fross: 35 years of application of micropiles in Austria 51

IWM 2006 - Schrobenhausen, Germany May 3-7, 2006

UnderUnder waterwater concretingconcreting

Page 52: Fross - THIRTYFIVE YEARS OF APPLICATION OF ... - Fross...2006/04/28  · the south and southeast of the city of Vienna, close to Vienna International Airport Schwechat. Construction

M. Fross: 35 years of application of micropiles in Austria 52

IWM 2006 - Schrobenhausen, Germany May 3-7, 2006

UnderUnder waterwater concreteconcrete slabslab and and GEWIGEWI--pilepile headsheads

Page 53: Fross - THIRTYFIVE YEARS OF APPLICATION OF ... - Fross...2006/04/28  · the south and southeast of the city of Vienna, close to Vienna International Airport Schwechat. Construction

M. Fross: 35 years of application of micropiles in Austria 53

IWM 2006 - Schrobenhausen, Germany May 3-7, 2006

CleaningCleaning and and compensationcompensation concreteconcrete

Page 54: Fross - THIRTYFIVE YEARS OF APPLICATION OF ... - Fross...2006/04/28  · the south and southeast of the city of Vienna, close to Vienna International Airport Schwechat. Construction

M. Fross: 35 years of application of micropiles in Austria 54

IWM 2006 - Schrobenhausen, Germany May 3-7, 2006

Page 55: Fross - THIRTYFIVE YEARS OF APPLICATION OF ... - Fross...2006/04/28  · the south and southeast of the city of Vienna, close to Vienna International Airport Schwechat. Construction

M. Fross: 35 years of application of micropiles in Austria 55

IWM 2006 - Schrobenhausen, Germany May 3-7, 2006

ReinforcementReinforcement of of thethe tunneltunnel basebase

Page 56: Fross - THIRTYFIVE YEARS OF APPLICATION OF ... - Fross...2006/04/28  · the south and southeast of the city of Vienna, close to Vienna International Airport Schwechat. Construction

M. Fross: 35 years of application of micropiles in Austria 56

IWM 2006 - Schrobenhausen, Germany May 3-7, 2006

CLOSING REMARKSCLOSING REMARKSAustriaAustria nownow has a has a traditiontradition of of applicationapplication of of micropilesmicropilesof 35 of 35 yearsyears..WeWe havehave a a widewide rangerange of of typestypes of of micropilesmicropiles, , bothboth boredboredpilespiles and and displacementdisplacement pilespiles..WeWe havehave severalseveral contractorscontractors offeringoffering thesethese different different typestypesof of micropilesmicropiles..These These contractorscontractors areare organizedorganized withinwithin VÖBU (VÖBU (AustrianAustrianassociationassociation of of specialspecial foundationfoundation contractorscontractors), ), affiliatedaffiliated to to EFFC (European EFFC (European FederationFederation of of FoundationFoundation ContractorsContractors).).ISM ISM -- International Society International Society forfor MicropilesMicropiles isis notnot yetyet knownknownin in AustriaAustria, , butbut I will I will trytry to do to do mymy best to bring best to bring thisthis newnewsocietysociety to to thethe attentionattention of all of all AustrianAustrian geotechnicalgeotechnicalengineersengineers workingworking in different in different fieldsfields ((sciencescience, , universitiesuniversities, , authoritesauthorites, , designersdesigners and and contractorscontractors). ).

Page 57: Fross - THIRTYFIVE YEARS OF APPLICATION OF ... - Fross...2006/04/28  · the south and southeast of the city of Vienna, close to Vienna International Airport Schwechat. Construction

M. Fross: 35 years of application of micropiles in Austria 57

IWM 2006 - Schrobenhausen, Germany May 3-7, 2006

ActivitiesActivities in in AustriaAustriain 2005in 2005

to to promotepromote thethe useuseof of micropliesmicropliesaccordingaccording to to

European Standard European Standard ÖNORM EN 14199ÖNORM EN 14199

Page 58: Fross - THIRTYFIVE YEARS OF APPLICATION OF ... - Fross...2006/04/28  · the south and southeast of the city of Vienna, close to Vienna International Airport Schwechat. Construction

M. Fross: 35 years of application of micropiles in Austria 58

IWM 2006 - Schrobenhausen, Germany May 3-7, 2006

ManyMany thanksthanks forfor youryour kindkind attentionattention!!