277
From: To: Cc: Subject: FW: TI Presidential Transition (FINAL 2).pptx FENCE & ROADS Date: Friday, November 11, 2016 9:03:38 AM Attachments: fysa From: Sent: Friday, November 11, 2016 8:51 AM To: BORKOWSKI, MARK S < >; PROVOST, CARLA (USBP) CALVO, KARL H. Cc: Subject: RE: TI Presidential Transition (FINAL 2).pptx FENCE & ROADS All – Attached is the final consolidated deck. All the content from both the OFAM and USBP decks has been combined. The existing fence lengths have been adjusted to match OFAM’s records and all new requirements by USBP have been run through the OFAM cost models. The base brief is five content slides with all detail pushed to the back-up. Should further work be required, I’ll be standing by. Chief of Staff Office of Facilities and Asset Management From: BORKOWSKI, MARK S Sent: Friday, November 11, 2016 6:47 AM To: PROVOST, CARLA (USBP) ; CALVO, KARL H. ; > Cc: BW11 FOIA CBP 003037 (b) (6), (b) (7)(C) (b) (6), (b) (7)(C) (b) (6), (b) (7)(C) (b) (6), (b) (7)(C) (b) (6), (b) (7)(C) (b) (6), (b) (7)(C) (b) (6), (b) (7)(C) (b) (6), (b) (7)(C) (b) (6), (b) (7)(C) (b) (6), (b) (7)(C) (b) (6), (b) (7)(C) (b) (6), (b) (7)(C) (b) (6), (b) (7)(C) (b) (6), (b) (7)(C) (b) (6), (b) (7)(C) (b) (6), (b) (7)(C) (b) (6), (b) (7)(C) (b) (6), (b) (7)(C) (b) (6), (b) (7)(C) (b) (5)

From: To: Cc: Subject: FW: TI Presidential Transition (FINAL … · 2019-04-15 · Subject: FW: TI Presidential Transition (FINAL 2).pptx FENCE & ROADS ALCON, Please find attached

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: From: To: Cc: Subject: FW: TI Presidential Transition (FINAL … · 2019-04-15 · Subject: FW: TI Presidential Transition (FINAL 2).pptx FENCE & ROADS ALCON, Please find attached

From:To:Cc:Subject: FW: TI Presidential Transition (FINAL 2).pptx FENCE & ROADSDate: Friday, November 11, 2016 9:03:38 AMAttachments:

fysa 

From:   Sent: Friday, November 11, 2016 8:51 AMTo: BORKOWSKI, MARK S < >; 

 PROVOST, CARLA (USBP)  CALVO, KARL H. 

Cc: 

Subject: RE: TI Presidential Transition (FINAL 2).pptx FENCE & ROADS All – Attached is the final consolidated deck. All the content from both the OFAM and USBP deckshas been combined.  The existing fence lengths have been adjusted to match OFAM’s records and allnew requirements by USBP have been run through the OFAM cost models. The base brief is fivecontent slides with all detail pushed to the back-up.    Should further work be required, I’ll be standing by. 

Chief of StaffOffice of Facilities and Asset Management

  

From: BORKOWSKI, MARK S Sent: Friday, November 11, 2016 6:47 AMTo: 

 PROVOST, CARLA (USBP)  ; CALVO, KARL H.  ;

>Cc: 

BW11 FOIA CBP 003037

(b) (6), (b) (7)(C)(b) (6), (b) (7)(C)

(b) (6), (b) (7)(C)

(b) (6), (b) (7)(C)

(b) (6), (b) (7)(C)

(b) (6), (b) (7)(C)

(b) (6), (b) (7)(C)

(b) (6), (b) (7)(C)

(b) (6), (b) (7)(C) (b) (6), (b) (7)(C)(b) (6), (b) (7)(C)

(b) (6), (b) (7)(C) (b) (6), (b) (7)(C)(b) (6), (b) (7)(C)

(b) (6), (b) (7)(C)(b) (6), (b) (7)(C)

(b) (6), (b) (7)(C) (b) (6), (b) (7)(C)(b) (6), (b) (7)(C)

(b) (5)

Page 2: From: To: Cc: Subject: FW: TI Presidential Transition (FINAL … · 2019-04-15 · Subject: FW: TI Presidential Transition (FINAL 2).pptx FENCE & ROADS ALCON, Please find attached

Subject: RE: TI Presidential Transition (FINAL 2).pptx FENCE & ROADS Folks,

This looks like a lot of good work--but please don't overwork this task. C2 is looking for thebig picture and pricing rules of thumb. We don't have to have high fidelity pricing.

3 or 4 charts for the prinary deck--keep the message simple. The backup detail will be greatbut let's not hold up answering the mail for the sake of solving world hunger#

From: Sent: Friday, November 11, 2016 12:21:49 AMTo: ; PROVOST, CARLA (USBP); CALVO, KARL H.;

; BORKOWSKI, MARK SCc:

Subject: RE: TI Presidential Transition (FINAL 2).pptx FENCE & ROADS

Thank you, sir.  The new estimates are completed and I’ve updated the tables. I plan to look at theseagain first AM with fresh eyes and get this back to the group CCed here for final concurrence. 

Best,

 

 

From:   Sent: Thursday, November 10, 2016 10:04 PMTo: PROVOST, CARLA (USBP) 

 CALVO, KARLH. BORKOWSKI, MARK S <[email protected]>Cc: 

Subject: RE: TI Presidential Transition (FINAL 2).pptx FENCE & ROADS

BW11 FOIA CBP 003038

(b) (6), (b) (7)(C)

(b) (6), (b) (7)(C)

(b) (6), (b) (7)(C)

(b) (6), (b) (7)(C)

(b) (6), (b) (7)(C)

(b) (6), (b) (7)(C)

(b) (6), (b) (7)(C)

(b) (6), (b) (7)(C) (b) (6), (b) (7)(C) (b) (6), (b) (7)(C)

(b) (6), (b) (7)(C)

(b) (6), (b) (7)(C)

Page 3: From: To: Cc: Subject: FW: TI Presidential Transition (FINAL … · 2019-04-15 · Subject: FW: TI Presidential Transition (FINAL 2).pptx FENCE & ROADS ALCON, Please find attached

 

Thanks for the phone call. After our discussion, please use the OFAM (FM&E) modelgenerated numbers. The USBP numbers are tactically very good, but the model is morecomprehensive at the strategic level and account for the increased complexity of mega projects(economy of scale, environmental considerations, increased project management staff, etc.).Secondly, please use your numbers on the distances. But please ensure the numberspresented, round up to the higher of the two. We need the mega macro number to be largeenough to cover the requirement with a consistent story from all of CBP. Then please makesure you tell us...so we can all tell the same story!

Don't hesitate to call if you need help!VR

From: PROVOST, CARLA (USBP)Sent: Thursday, November 10, 2016 9:28:39 PMTo: CALVO, KARL H.; L; BORKOWSKI, MARK SCc:

Subject: RE: TI Presidential Transition (FINAL 2).pptx FENCE & ROADS

 Try calling   

Carla L. ProvostDeputy ChiefU.S. Border Patrol(

 

From:   Sent: Thursday, November 10, 2016 9:25 PMTo:  >; PROVOST, CARLA (USBP)

>; CALVO, KARL H. >; BORKOWSKI, MARK S

Cc: 

BW11 FOIA CBP 003039

(b) (6), (b) (7)(C)

(b) (6), (b) (7)(C)

(b) (6), (b) (7)(C)

(b) (6), (b) (7)(C)

(b) (6), (b) (7)(C)

(b) (6), (b) (7)(C)

(b) (6), (b) (7)(C)

(b) (6), (b) (7)(C)

(b) (6), (b) (7)(C) (b) (6), (b) (7)(C)

(b) (6), (b) (7)(C)(b) (6), (b) (7)(C) (b) (6), (b) (7)(C)

(b) (6), (b) (7)(C)

Page 4: From: To: Cc: Subject: FW: TI Presidential Transition (FINAL … · 2019-04-15 · Subject: FW: TI Presidential Transition (FINAL 2).pptx FENCE & ROADS ALCON, Please find attached

Subject: RE: TI Presidential Transition (FINAL 2).pptx FENCE & ROADS Ms.  Questions regarding costs should be referred to XD   or his designee.  He is copied above. Thanks. 

Deputy ChiefLaw Enforcement Operations DirectorateU.S. Border Patrol

 

From:   Sent: Thursday, November 10, 2016 9:11 PMTo: PROVOST, CARLA (USBP) < >; CALVO, KARL H.

>;BORKOWSKI, MARK S <Cc: 

Subject: RE: TI Presidential Transition (FINAL 2).pptx FENCE & ROADS Chief Provost – There are some minor data differences and some questions regarding the costs that Ineed to resolve to combine these. I realize it’s late in the evening but would it be possible to discussby phone briefly in order expedite completion? I’m happy to work with whomever the appropriatepoints of contact are to do this as quickly as possible. Thank you,

 

 

From: PROVOST, CARLA (USBP) Sent: Thursday, November 10, 2016 8:40 PMTo:  >; CALVO, KARL H.

BORKOWSKI, MARK S  >

BW11 FOIA CBP 003040

(b) (6), (b) (7)(C)

(b) (6), (b) (7)(C)

(b) (6), (b) (7)(C)

(b) (6), (b) (7)(C)

(b) (6), (b) (7)(C)

(b) (6), (b) (7)(C)

(b) (6), (b) (7)(C)

(b) (6), (b) (7)(C)(b) (6), (b) (7)(C)(b) (6), (b) (7)(C)

(b) (6), (b) (7)(C)(b) (6), (b) (7)(C)

(b) (6), (b) (7)(C)

(b)(6);(b)(7)(C)

Page 5: From: To: Cc: Subject: FW: TI Presidential Transition (FINAL … · 2019-04-15 · Subject: FW: TI Presidential Transition (FINAL 2).pptx FENCE & ROADS ALCON, Please find attached

Cc: 

Subject: FW: TI Presidential Transition (FINAL 2).pptx FENCE & ROADS ALCON, Please find attached USBP’s submission for the Infrastructure (fencing and roads) transition pptx.  Iappreciate your patience as our team worked diligently to get these updated numbers.  Please let usknow if you have questions or concerns. Thank you,Carla  Carla L. ProvostDeputy ChiefUSBP

 

From:   Sent: Thursday, November 10, 2016 8:14 PMTo: PROVOST, CARLA (USBP)

Cc: 

Subject: TI Presidential Transition (FINAL 2).pptx Changes as requested

BW11 FOIA CBP 003041

(b) (6), (b) (7)(C)(b) (6), (b) (7)(C)

(b) (6), (b) (7)(C)

(b) (6), (b) (7)(C)

(b) (6), (b) (7)(C)

(b) (6), (b) (7)(C)

Page 6: From: To: Cc: Subject: FW: TI Presidential Transition (FINAL … · 2019-04-15 · Subject: FW: TI Presidential Transition (FINAL 2).pptx FENCE & ROADS ALCON, Please find attached

From:To:Cc:Subject: FW: TI Presidential Transition (FINAL 2).pptx FENCE & ROADSDate: Wednesday, November 16, 2016 7:12:19 AMAttachments:

-

 

Thanks- 

Senior AttorneyOffice of Assistant Chief Counsel, IndianapolisCustoms and Border Protection

 This communication might contain communications between attorney and client,

communications that are part of the agency deliberative process, or attorney-workproduct, all of which are privileged and not subject to disclosure outside the agency or to

the public. Please consult with the Office of Assistant Chief Counsel-Indianapolis, U.S.Customs and Border Protection before disclosing any information contained in this email.

 

From:   Sent: Friday, November 11, 2016 8:21 PMTo: 

Subject: FW: TI Presidential Transition (FINAL 2).pptx FENCE & ROADS 

BW11 FOIA CBP 003042

(b) (6), (b) (7)(C)(b) (6), (b) (7)(C)

(b) (6), (b) (7)(C)

(b) (6), (b) (7)(C)

(b) (6), (b) (7)(C)

(b) (6), (b) (7)(C)

(b) (6), (b) (7)(C)

(b) (5)(b) (6), (b) (7)(C)

(b) (5)

Page 7: From: To: Cc: Subject: FW: TI Presidential Transition (FINAL … · 2019-04-15 · Subject: FW: TI Presidential Transition (FINAL 2).pptx FENCE & ROADS ALCON, Please find attached

From:To:

Cc:Subject: TI Presidential Transition FENCE & ROADSDate: Monday, November 14, 2016 9:30:43 AMAttachments:

All – Please see attached for the deck that went forward last week regarding fence and roads. Lots ofgood information in here.

Branch Chief, Communications and Workforce StrategyBorder Patrol & Air and Marine Program Management OfficeFacilities Management and EngineeringOffice of Facilities and Asset Management

BW11 FOIA CBP 003043

(b) (6), (b) (7)(C)

(b) (6), (b) (7)(C)

(b) (6), (b) (7)(C)

(b) (6), (b) (7)(C)

(b) (6), (b) (7)(C)

(b) (5)

Page 8: From: To: Cc: Subject: FW: TI Presidential Transition (FINAL … · 2019-04-15 · Subject: FW: TI Presidential Transition (FINAL 2).pptx FENCE & ROADS ALCON, Please find attached

Cc: 

Subject: FW: TI Presidential Transition (FINAL 2).pptx FENCE & ROADS ALCON, Please find attached USBP’s submission for the Infrastructure (fencing and roads) transition pptx.  Iappreciate your patience as our team worked diligently to get these updated numbers.  Please let usknow if you have questions or concerns. Thank you,Carla  Carla L. ProvostDeputy ChiefUSBP

 

From:   Sent: Thursday, November 10, 2016 8:14 PMTo: PROVOST, CARLA (USBP) 

Cc: 

Subject: TI Presidential Transition (FINAL 2).pptx Changes as requested

BW11 FOIA CBP 003044

(b) (6), (b) (7)(C)

(b) (6), (b) (7)(C)

(b) (6), (b) (7)(C)

(b) (6), (b) (7)(C)

(b) (6), (b) (7)(C)

Page 9: From: To: Cc: Subject: FW: TI Presidential Transition (FINAL … · 2019-04-15 · Subject: FW: TI Presidential Transition (FINAL 2).pptx FENCE & ROADS ALCON, Please find attached

From:To: .Cc:Subject: Updated deck for C2Date: Tuesday, November 22, 2016 2:41:19 PMAttachments: C2_TI Requirements Deck INTERNAL 11_22_2016v1.pptx

Updates include:- Delete proposed map- New ‘notional’ language; need USBP to confirm- Broke out slide 5 and 6 to show SWB and NB- Added in definition of Roosevelt Reservation- Added CA/US treaty language- Updated the note on the timeline slide- Split out slides 32 and 33 to show NB and SWB

Please let me know of any other edits.

Branch Chief, Communications and Workforce StrategyBorder Patrol & Air and Marine Program Management OfficeFacilities Management and EngineeringOffice of Facilities and Asset Management

BW11 FOIA CBP 003045

(b) (6), (b) (7)(C)

(b) (6), (b) (7)(C)(b) (6), (b) (7)(C)

(b) (6), (b) (7)(C)

(b) (6), (b) (7)(C)

Page 10: From: To: Cc: Subject: FW: TI Presidential Transition (FINAL … · 2019-04-15 · Subject: FW: TI Presidential Transition (FINAL 2).pptx FENCE & ROADS ALCON, Please find attached

Office of Facilities and Asset Management

Overview of CBP Fence and Roads

CBP Enterprise Services

November 23, 2016

1BW11 FOIA CBP 003046

Page 11: From: To: Cc: Subject: FW: TI Presidential Transition (FINAL … · 2019-04-15 · Subject: FW: TI Presidential Transition (FINAL 2).pptx FENCE & ROADS ALCON, Please find attached

Map of Existing Fence

Please note that numbers may not add up due to rounding. Fence mileage is tracked to the thousandth decimal place.

PREDECISIONAL/FOR OFFICIAL USE ONLY 2BW11 FOIA CBP 003047

(b) (7)(E)(b) (7)(E)

EZAISA6
Cross-Out
Page 12: From: To: Cc: Subject: FW: TI Presidential Transition (FINAL … · 2019-04-15 · Subject: FW: TI Presidential Transition (FINAL 2).pptx FENCE & ROADS ALCON, Please find attached

A Foundation on Which to Build Fence

• CBP was tasked with building 700 miles of “two layer” fencing on the southwest border which was later changed to meet USBP operational requirements of 654 miles of primary fence.

• This was tasked to CBP in July 2007, with over 600 miles completed by January 20, 2009.

• 654 miles of primary fence have been completed to date, with the majority of mileage completed between 2008 and 2009.

PREDECISIONAL/FOR OFFICIAL USE ONLY 3BW11 FOIA CBP 003048

EZAISA6
Cross-Out
Page 13: From: To: Cc: Subject: FW: TI Presidential Transition (FINAL … · 2019-04-15 · Subject: FW: TI Presidential Transition (FINAL 2).pptx FENCE & ROADS ALCON, Please find attached

Map of Existing & Proposed Fence

4PREDECISIONAL/FOR OFFICIAL USE ONLY

This is a high level view of proposed requirements refinements of geospatial lines in progress

BW11 FOIA CBP 003049

(b) (7)(E), (b) (5)

EZAISA6
Cross-Out
Page 14: From: To: Cc: Subject: FW: TI Presidential Transition (FINAL … · 2019-04-15 · Subject: FW: TI Presidential Transition (FINAL 2).pptx FENCE & ROADS ALCON, Please find attached

Summary of Unconstrained Operational Needs & Cost Estimates

5PREDECISIONAL/FOR OFFICIAL USE ONLY

*Some miles are operationally achievable with TI or other assets

Requirement Type New MilesAcquisition/Initial Costs ROM (-50%/+100%) Cost

20 Year Recurring Costs (Maintenance and Repair)

Total End State Cost

New Primary PFNew VF

Replacement Primary PF & VFNew Secondary PF

New RoadsRepairs to Existing Roads

$ Total Costs

Southwest Border

Requirement Type New MilesAcquisition/Initial Costs ROM (-50%/+100%) Cost

20 Year Recurring Costs (Maintenance and Repair)

Total End State Cost

New Primary PFNew VF

Replacement Primary PF & VFNew Secondary PF

New RoadsRepairs to Existing Roads

$ Total Costs

Northern Border

BW11 FOIA CBP 003050

(b) (7)(E), (b) (5)

(b) (7)(E), (b) (5)(b) (5)

(b) (5)

EZAISA6
Cross-Out
Page 15: From: To: Cc: Subject: FW: TI Presidential Transition (FINAL … · 2019-04-15 · Subject: FW: TI Presidential Transition (FINAL 2).pptx FENCE & ROADS ALCON, Please find attached

6

Requirement Type New MilesAcquisition/Initial Costs 20 Year Recurring Costs

Total End State Cost

New Primary PFNew VF

Replacement Primary PF & VFNew Secondary PF

New RoadsRepairs to Existing Roads

$ Total Costs

Southwest and Northern Border

PREDECISIONAL/FOR OFFICIAL USE ONLY

Summary of Unconstrained Operational Needs & Cost Estimates

Unconstrained operational need at the beginning of the planning process does not necessarily reflect the feasibility of the ultimate execution of those needs. These miles do not reflect the critical need nor do they reflect alternate enforcement solutions.

***Statement pending USBP Approval / Edits***

BW11 FOIA CBP 003051

(b) (5)

(b) (7)(E), (b) (5)

EZAISA6
Cross-Out
Page 16: From: To: Cc: Subject: FW: TI Presidential Transition (FINAL … · 2019-04-15 · Subject: FW: TI Presidential Transition (FINAL 2).pptx FENCE & ROADS ALCON, Please find attached

Quickest Wins

• Replacement of primary pedestrian and vehicle fence in El Centro, Tucson, and El Paso where CBP already has real estate access and environmental analysis has been completed.

- The right to access, construct, maintain, and repair tactical infrastructure in many areas of the border is secured through the Roosevelt Reservation: a 1907 Executive Order authorizing federal property rights within 60-feet of the international border in CA, AZ, & NM. The Roosevelt Reservation is the basis for CBP property rights along much of the border fence.

7PREDECISIONAL/FOR OFFICIAL USE ONLYBW11 FOIA CBP 003052

(b) (7)(E)

(b) (5)

EZAISA6
Cross-Out
Page 17: From: To: Cc: Subject: FW: TI Presidential Transition (FINAL … · 2019-04-15 · Subject: FW: TI Presidential Transition (FINAL 2).pptx FENCE & ROADS ALCON, Please find attached

8

Estimated High Level TimelineOverall Project Assumptions:1)2)3)

NTP + 12 months

NTP + 24 months

NTP + 36 months

Notice to Proceed

(NTP)

PREDECISIONAL/FOR OFFICIAL USE ONLYBW11 FOIA CBP 003053

(b) (5)

(b) (5)

EZAISA6
Cross-Out
Page 18: From: To: Cc: Subject: FW: TI Presidential Transition (FINAL … · 2019-04-15 · Subject: FW: TI Presidential Transition (FINAL 2).pptx FENCE & ROADS ALCON, Please find attached

9

Quick Win Timeline

NTP + 12 months

NTP + 24 months

NTP + 36 months

Notice to Proceed

(NTP)

Quick Win Assumptions:1)2)

3)

Acquisition

Design

Environmental

Real Estate

PREDECISIONAL/FOR OFFICIAL USE ONLYBW11 FOIA CBP 003054

(b) (5)

(b) (5)

EZAISA6
Cross-Out
Page 19: From: To: Cc: Subject: FW: TI Presidential Transition (FINAL … · 2019-04-15 · Subject: FW: TI Presidential Transition (FINAL 2).pptx FENCE & ROADS ALCON, Please find attached

Approach to Fence Construction

• Cost: – Primary PF: per mile Average of /mile for real estate and environmental planning, construction and

construction oversight.– /mile for mileage in all Sectors except Laredo & RGV– mile for mileage in Laredo & RGV mile for environmental mitigation mile for real estate acquisition mile for staffing increases required to support the program

– Secondary PF: per mile Average o mile for real estate and environmental planning, construction and

construction oversight – also include $ /mile for road between layers of fence mile for environmental mitigation ile for real estate acquisition mile for staffing increases required to support the program

10PREDECISIONAL/FOR OFFICIAL USE ONLYBW11 FOIA CBP 003055

(b) (5)(b) (5)

(b) (5)

(b) (5)(b) (5)

(b) (5)(b) (5)

(b) (5)

(b) (5)(b) (5)(b) (5)

(b) (5)

EZAISA6
Cross-Out
Page 20: From: To: Cc: Subject: FW: TI Presidential Transition (FINAL … · 2019-04-15 · Subject: FW: TI Presidential Transition (FINAL 2).pptx FENCE & ROADS ALCON, Please find attached

Approach to Fence Construction

• Cost (continued)– VF: per mile Average of /mile for real estate and environmental planning, construction

and construction oversight. /mile for environmental mitigation /mile for real estate acquisition /mile for staffing increases required to support the program

• Government Furnished Material (GFM) and Supply Chain:–

• Procurement–––

11PREDECISIONAL/FOR OFFICIAL USE ONLYBW11 FOIA CBP 003056

(b) (5)(b) (5)

(b) (5)(b) (5)

(b) (5)

(b) (5)

(b) (5)

EZAISA6
Cross-Out
Page 21: From: To: Cc: Subject: FW: TI Presidential Transition (FINAL … · 2019-04-15 · Subject: FW: TI Presidential Transition (FINAL 2).pptx FENCE & ROADS ALCON, Please find attached

Approach to Complete Fence Construction

• Other Considerations (slide 1 of 2)

12PREDECISIONAL/FOR OFFICIAL USE ONLYBW11 FOIA CBP 003057

(b) (5)

EZAISA6
Cross-Out
Page 22: From: To: Cc: Subject: FW: TI Presidential Transition (FINAL … · 2019-04-15 · Subject: FW: TI Presidential Transition (FINAL 2).pptx FENCE & ROADS ALCON, Please find attached

Approach to Complete Fence Construction

• Other Considerations (slide 2 of 2)–

––

––

13PREDECISIONAL/FOR OFFICIAL USE ONLYBW11 FOIA CBP 003058

(b) (5)

EZAISA6
Cross-Out
Page 23: From: To: Cc: Subject: FW: TI Presidential Transition (FINAL … · 2019-04-15 · Subject: FW: TI Presidential Transition (FINAL 2).pptx FENCE & ROADS ALCON, Please find attached

BACKUP

14PREDECISIONAL/FOR OFFICIAL USE ONLYBW11 FOIA CBP 003059

EZAISA6
Cross-Out
Page 24: From: To: Cc: Subject: FW: TI Presidential Transition (FINAL … · 2019-04-15 · Subject: FW: TI Presidential Transition (FINAL 2).pptx FENCE & ROADS ALCON, Please find attached

Border Fence Overview

• To date, U.S. Customs and Border Protection (CBP) completed 654 miles of primary pedestrian and vehicle fence. – Border Fence provides persistent impedance to illegal cross-border activity,

– CBP has completed three main fence programs since the enactment of the Secure Fence Act in 2006: Pedestrian Fence (PF) 70, PF 225, and Vehicle Fence (VF) 300. Any fence constructed prior to these programs is considered “legacy.”*

– Tactical Infrastructure (TI) also includes roads, bridges and boat ramps; drainage structures and grates; lighting and electrical systems; and vegetation and debris removal.

*The term “legacy” is also used to define older fence designs including landing mat. These legacy designs are being assessed for replacement.Please note that numbers may not add up due to rounding. Fence mileage is tracked to the thousandth decimal place.

Vehicle FenceSector Primary Secondary Tertiary TOTAL PF TOTAL VFBig Bend (BBT)Del Rio (DRT)El Centro (ELC)El Paso (EPT)Laredo (LRT)Rio Grande Valley (RGV)San Diego (SDC)Tucson (TCA)Yuma (YUM)TOTAL

Pedestrian Fence

15PREDECISIONAL/FOR OFFICIAL USE ONLYBW11 FOIA CBP 003060

(b) (7)(E)(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

EZAISA6
Cross-Out
Page 25: From: To: Cc: Subject: FW: TI Presidential Transition (FINAL … · 2019-04-15 · Subject: FW: TI Presidential Transition (FINAL 2).pptx FENCE & ROADS ALCON, Please find attached

Maps – Current Fence, California

16PREDECISIONAL/FOR OFFICIAL USE ONLYBW11 FOIA CBP 003061

(b) (7)(E)

EZAISA6
Cross-Out
Page 26: From: To: Cc: Subject: FW: TI Presidential Transition (FINAL … · 2019-04-15 · Subject: FW: TI Presidential Transition (FINAL 2).pptx FENCE & ROADS ALCON, Please find attached

Maps – Current & Proposed Fence, California

17PREDECISIONAL/FOR OFFICIAL USE ONLY

This is a high level view of proposed requirements refinements of geospatial lines in progress

BW11 FOIA CBP 003062

(b) (7)(E), (b) (5)

EZAISA6
Cross-Out
Page 27: From: To: Cc: Subject: FW: TI Presidential Transition (FINAL … · 2019-04-15 · Subject: FW: TI Presidential Transition (FINAL 2).pptx FENCE & ROADS ALCON, Please find attached

Maps – Current Fence, Arizona

18PREDECISIONAL/FOR OFFICIAL USE ONLY

Please Note: This is a high level view of proposed requirements refinements of geospatial lines in progress

BW11 FOIA CBP 003063

(b) (7)(E)

EZAISA6
Cross-Out
Page 28: From: To: Cc: Subject: FW: TI Presidential Transition (FINAL … · 2019-04-15 · Subject: FW: TI Presidential Transition (FINAL 2).pptx FENCE & ROADS ALCON, Please find attached

Maps – Current & Proposed Fence, Arizona

19PREDECISIONAL/FOR OFFICIAL USE ONLYThis is a high level view of proposed requirements refinements of geospatial lines in progress

BW11 FOIA CBP 003064

(b) (7)(E), (b) (5)

EZAISA6
Cross-Out
Page 29: From: To: Cc: Subject: FW: TI Presidential Transition (FINAL … · 2019-04-15 · Subject: FW: TI Presidential Transition (FINAL 2).pptx FENCE & ROADS ALCON, Please find attached

Maps – Current Fence, New Mexico

20PREDECISIONAL/FOR OFFICIAL USE ONLY

Please Note: This is a high level view of proposed requirements refinements of geospatial lines in progress

BW11 FOIA CBP 003065

(b) (7)(E)

EZAISA6
Cross-Out
Page 30: From: To: Cc: Subject: FW: TI Presidential Transition (FINAL … · 2019-04-15 · Subject: FW: TI Presidential Transition (FINAL 2).pptx FENCE & ROADS ALCON, Please find attached

Maps – Current & Proposed Fence, New Mexico

21PREDECISIONAL/FOR OFFICIAL USE ONLYBW11 FOIA CBP 003066

(b) (7)(E), (b) (5)

EZAISA6
Cross-Out
Page 31: From: To: Cc: Subject: FW: TI Presidential Transition (FINAL … · 2019-04-15 · Subject: FW: TI Presidential Transition (FINAL 2).pptx FENCE & ROADS ALCON, Please find attached

Maps – Current Fence, Texas

22PREDECISIONAL/FOR OFFICIAL USE ONLY

Please Note: This is a high level view of proposed requirements refinements of geospatial lines in progress

BW11 FOIA CBP 003067

(b) (7)(E)

EZAISA6
Cross-Out
Page 32: From: To: Cc: Subject: FW: TI Presidential Transition (FINAL … · 2019-04-15 · Subject: FW: TI Presidential Transition (FINAL 2).pptx FENCE & ROADS ALCON, Please find attached

Maps – Current & Proposed Fence Fence, Texas

23PREDECISIONAL/FOR OFFICIAL USE ONLY

Please Note: Anywhere there is secondary fence, there is a primary fence layer below it. This is a high level view of proposed requirements refinements of geospatial lines in progress

BW11 FOIA CBP 003068

(b) (7)(E), (b) (5)

EZAISA6
Cross-Out
Page 33: From: To: Cc: Subject: FW: TI Presidential Transition (FINAL … · 2019-04-15 · Subject: FW: TI Presidential Transition (FINAL 2).pptx FENCE & ROADS ALCON, Please find attached

Maps – Current & Proposed Fence Fence, Washington

24PREDECISIONAL/FOR OFFICIAL USE ONLYBW11 FOIA CBP 003069

(b) (7)(E), (b) (5)

EZAISA6
Cross-Out
Page 34: From: To: Cc: Subject: FW: TI Presidential Transition (FINAL … · 2019-04-15 · Subject: FW: TI Presidential Transition (FINAL 2).pptx FENCE & ROADS ALCON, Please find attached

Maps – Proposed Fence, Idaho

25PREDECISIONAL/FOR OFFICIAL USE ONLYBW11 FOIA CBP 003070

(b) (5)

EZAISA6
Cross-Out
Page 35: From: To: Cc: Subject: FW: TI Presidential Transition (FINAL … · 2019-04-15 · Subject: FW: TI Presidential Transition (FINAL 2).pptx FENCE & ROADS ALCON, Please find attached

Maps – Current & Proposed Fence, Montana

26PREDECISIONAL/FOR OFFICIAL USE ONLYBW11 FOIA CBP 003071

(b) (7)(E), (b) (5)

EZAISA6
Cross-Out
Page 36: From: To: Cc: Subject: FW: TI Presidential Transition (FINAL … · 2019-04-15 · Subject: FW: TI Presidential Transition (FINAL 2).pptx FENCE & ROADS ALCON, Please find attached

Maps – Proposed Fence, New York

27PREDECISIONAL/FOR OFFICIAL USE ONLYBW11 FOIA CBP 003072

(b) (5)

EZAISA6
Cross-Out
Page 37: From: To: Cc: Subject: FW: TI Presidential Transition (FINAL … · 2019-04-15 · Subject: FW: TI Presidential Transition (FINAL 2).pptx FENCE & ROADS ALCON, Please find attached

Maps – Proposed Fence, Vermont

28PREDECISIONAL/FOR OFFICIAL USE ONLYBW11 FOIA CBP 003073

(b) (5)

Page 38: From: To: Cc: Subject: FW: TI Presidential Transition (FINAL … · 2019-04-15 · Subject: FW: TI Presidential Transition (FINAL 2).pptx FENCE & ROADS ALCON, Please find attached

Maps – Proposed Fence, New Hampshire

29PREDECISIONAL/FOR OFFICIAL USE ONLYBW11 FOIA CBP 003074

(b) (5)

Page 39: From: To: Cc: Subject: FW: TI Presidential Transition (FINAL … · 2019-04-15 · Subject: FW: TI Presidential Transition (FINAL 2).pptx FENCE & ROADS ALCON, Please find attached

Maps – Proposed Fence, Maine

30PREDECISIONAL/FOR OFFICIAL USE ONLYBW11 FOIA CBP 003075

(b) (5)

Page 40: From: To: Cc: Subject: FW: TI Presidential Transition (FINAL … · 2019-04-15 · Subject: FW: TI Presidential Transition (FINAL 2).pptx FENCE & ROADS ALCON, Please find attached

Proposed New Fencing

FY16CAPABILITY

REQUIREMENTS

BLAINE

SPOKANE

HAVRE

GRAND FORKS

DETROIT

BUFFALO

SWANTON

HOULTON

MIAMI

NEW ORLEANS

DEL RIOLAREDO

RIO GRANDE VALLEY

EL PASOTUCSON

YUMA

ELCENTRO

SANDIEGO

RAMEY

BIG BEND

Proposed New Fencing

31PREDECISIONAL/FOR OFFICIAL USE ONLYBW11 FOIA CBP 003076

(b) (5)

(b) (5)

(b) (5)

(b) (5)

EZAISA6
Cross-Out
Page 41: From: To: Cc: Subject: FW: TI Presidential Transition (FINAL … · 2019-04-15 · Subject: FW: TI Presidential Transition (FINAL 2).pptx FENCE & ROADS ALCON, Please find attached

All Fence Requirements – Primary, PF & VF

32PREDECISIONAL/FOR OFFICIAL USE ONLY

Existing VF New Miles VF

ROM (-50/+100) Acquisition Cost VF

Existing Primary PF

New Miles Primary PF

ROM (-50/+100) Acquisition Cost

Primary PF

$ $

$ $ $ $ $ $ $ $

$ $ $ $ $ $ $ $

$ $

$ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $

BLWBUNDTMGFNHLT

YUMGrand Total

Sector

ELCEPTLRTRGVSDCTCA

HVMSPWSWB

Southwest Border Total

BBTDRT

Northern Border Total

BW11 FOIA CBP 003077

(b) (5) (b) (5)(b) (7)(E) (b) (7)(E)

EZAISA6
Cross-Out
Page 42: From: To: Cc: Subject: FW: TI Presidential Transition (FINAL … · 2019-04-15 · Subject: FW: TI Presidential Transition (FINAL 2).pptx FENCE & ROADS ALCON, Please find attached

All Fence Requirements –Replacement PF & Secondary PF

33PREDECISIONAL/FOR OFFICIAL USE ONLY

Replacement Miles PF

ROM (-50/+100) Acquisition Cost Replacement PF

Existing Secondary

PF

New Miles Secondary

PF

ROM (-50/+100) Acquisition Cost

Secondary PF

Existing Tertiary PF

$ $

$ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $

$ $

$ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $

BLWBUNDTMGFNHLT

YUMGrand Total

Sector

ELCEPTLRTRGVSDCTCA

HVMSPWSWB

Southwest Border Total

BBTDRT

Northern Border Total

BW11 FOIA CBP 003078

(b) (7)(E) (b) (7)(E) (b) (7)(E)

(b) (5) (b) (5)

EZAISA6
Cross-Out
Page 43: From: To: Cc: Subject: FW: TI Presidential Transition (FINAL … · 2019-04-15 · Subject: FW: TI Presidential Transition (FINAL 2).pptx FENCE & ROADS ALCON, Please find attached

Border Fence Photos – Legacy for Replacement

34

Pedestrian Fence – Legacy Pedestrian Fence – Bollard & Legacy

PREDECISIONAL/FOR OFFICIAL USE ONLYBW11 FOIA CBP 003079

(b) (7)(E)

(b) (7)(E)

Page 44: From: To: Cc: Subject: FW: TI Presidential Transition (FINAL … · 2019-04-15 · Subject: FW: TI Presidential Transition (FINAL 2).pptx FENCE & ROADS ALCON, Please find attached

Border Fence Photos – VF Designs

35

Vehicle Fence – Post/RailVehicle Fence – Normandy

PREDECISIONAL/FOR OFFICIAL USE ONLYBW11 FOIA CBP 003080

(b) (7)(E) (b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

Page 45: From: To: Cc: Subject: FW: TI Presidential Transition (FINAL … · 2019-04-15 · Subject: FW: TI Presidential Transition (FINAL 2).pptx FENCE & ROADS ALCON, Please find attached

Border Fence Photos – Floating Fence Design

36

Pedestrian Fence – Floating Fence – El Centro Sector

PREDECISIONAL/FOR OFFICIAL USE ONLYBW11 FOIA CBP 003081

EZAISA6
Cross-Out
Page 46: From: To: Cc: Subject: FW: TI Presidential Transition (FINAL … · 2019-04-15 · Subject: FW: TI Presidential Transition (FINAL 2).pptx FENCE & ROADS ALCON, Please find attached

Border Fence Photos – Preferred PF Design

37

Pedestrian Fence – PV-1 Bollard Tucson Sector

PREDECISIONAL/FOR OFFICIAL USE ONLYBW11 FOIA CBP 003082

EZAISA6
Cross-Out
Page 47: From: To: Cc: Subject: FW: TI Presidential Transition (FINAL … · 2019-04-15 · Subject: FW: TI Presidential Transition (FINAL 2).pptx FENCE & ROADS ALCON, Please find attached

Border Fence Photos – Preferred PF Design

38

Pedestrian Fence – PV-1 Bollard Tucson Sector Pedestrian Fence – PV-1 Bollard Yuma Sector

PREDECISIONAL/FOR OFFICIAL USE ONLYBW11 FOIA CBP 003083

EZAISA6
Cross-Out
Page 48: From: To: Cc: Subject: FW: TI Presidential Transition (FINAL … · 2019-04-15 · Subject: FW: TI Presidential Transition (FINAL 2).pptx FENCE & ROADS ALCON, Please find attached

Border Fence Photos – Levee Wall

39

Pedestrian “Flevee” – Fence on Levee

PREDECISIONAL/FOR OFFICIAL USE ONLYBW11 FOIA CBP 003084

EZAISA6
Cross-Out
EZAISA6
Cross-Out
Page 49: From: To: Cc: Subject: FW: TI Presidential Transition (FINAL … · 2019-04-15 · Subject: FW: TI Presidential Transition (FINAL 2).pptx FENCE & ROADS ALCON, Please find attached

Approach to Fence Construction

• Costs to Construct Primary PF (same for fence replacement costs)– On average, cost to construct primary pedestrian or replace primary pedestrian fence is

approximately per mile. – Estimate is a rough order of magnitude (-50/+100) and includes project planning and oversight,

environmental planning and compliance, environmental mitigation, real estate planning and acquisition, staffing and human capital requirements, design and construction.

• Cost to Construct Secondary PF– On average, cost to construct secondary PF is approximately per mile.– Estimate is a rough order of magnitude (-50/+100) and includes project planning and oversight,

environmental planning and compliance, environmental mitigation, real estate planning and acquisition, staffing and human capital requirements, design and construction.

• Costs to Construct VF – On average, cost to construct vehicle fence fence is approximately per mile. – Estimate is a rough order of magnitude (-50/+100) and includes project planning and oversight,

environmental planning and compliance, environmental mitigation, real estate planning and acquisition, staffing and human capital requirements, design and construction.

40PREDECISIONAL/FOR OFFICIAL USE ONLYBW11 FOIA CBP 003085

(b) (5)

(b) (5)

(b) (5)

(b) (5)

EZAISA6
Cross-Out
Page 50: From: To: Cc: Subject: FW: TI Presidential Transition (FINAL … · 2019-04-15 · Subject: FW: TI Presidential Transition (FINAL 2).pptx FENCE & ROADS ALCON, Please find attached

Approach to Fence Construction

• Legal Considerations–

41PREDECISIONAL/FOR OFFICIAL USE ONLYBW11 FOIA CBP 003086

(b) (5)

EZAISA6
Cross-Out
Page 51: From: To: Cc: Subject: FW: TI Presidential Transition (FINAL … · 2019-04-15 · Subject: FW: TI Presidential Transition (FINAL 2).pptx FENCE & ROADS ALCON, Please find attached

Approach to Complete Fence Construction

• Government Furnished Material (GFM) and Supply Chain:– The Buy American Act restricts the purchase of supplies that are not domestic products requiring

50% of the components to be produced in the U.S. Exceptions include non-availability and unreasonable costs. In order to purchase steel at a

reasonable cost, the CBP Head of Contracting Activity (HCA) will need to utilize FAR Part 25.2 to make a determination on cost reasonableness. Without a determination of cost reasonableness, there is a high risk of extremely high costs for steel.

– In order to ensure steel availability on time, at a lower cost and to avoid contractors competing for materials, CBP will establish a Supply Chain Management contract to purchase and deliver steel to the sites. Contract will be similar to the Boeing contract utilized during the prior fence construction programs.

• Procurement– CBP continues to work with its service providers to establish Multiple Award Task Order Contracts

(MATOC) and Indefinite Delivery Indefinite Quantity (IDIQ) Contracts to allow for an expedited contract award process for fence construction. Currently the existing contract vehicles allow for $167M in capacity for design and $162M in capacity for construction.

42PREDECISIONAL/FOR OFFICIAL USE ONLYBW11 FOIA CBP 003087

EZAISA6
Cross-Out
Page 52: From: To: Cc: Subject: FW: TI Presidential Transition (FINAL … · 2019-04-15 · Subject: FW: TI Presidential Transition (FINAL 2).pptx FENCE & ROADS ALCON, Please find attached

Approach to Complete Fence Construction

• Other Considerations:–

––

43PREDECISIONAL/FOR OFFICIAL USE ONLYBW11 FOIA CBP 003088

(b) (5)

EZAISA6
Cross-Out
Page 53: From: To: Cc: Subject: FW: TI Presidential Transition (FINAL … · 2019-04-15 · Subject: FW: TI Presidential Transition (FINAL 2).pptx FENCE & ROADS ALCON, Please find attached

Border Fence Background

• Section 102(b) of the Illegal Immigration Reform and Immigrant Responsibility Act of 1996 (IIRIRA), as amended, authorizes the Department of Homeland Security (DHS) to construct border infrastructure, including fencing, in locations where such infrastructure would be most practical and effective in deterring illegal entry on the southwest border.

• The purpose of border fence construction is to provide persistent impedance to illegal cross-border activity, which offers Border Patrol agents more time to respond to and resolve threats.

• To date, CBP completed 654 miles of primary pedestrian and vehicle fencing along the southwest border: approximately 354 miles of pedestrian fence and 300 miles of vehicle fence at the cost of approximately $2.3 billion.

• It is important to note that tactical infrastructure (TI) also includes roads; s and bridges; drainage structures and grates; lighting and electrical systems; vegetation and deb emoval; and tower real property, construction and maintenance.

44PREDECISIONAL/FOR OFFICIAL USE ONLYBW11 FOIA CBP 003089

(b) (7)(E)(b) (7)(E)

(b) (7)(E)

EZAISA6
Cross-Out
Page 54: From: To: Cc: Subject: FW: TI Presidential Transition (FINAL … · 2019-04-15 · Subject: FW: TI Presidential Transition (FINAL 2).pptx FENCE & ROADS ALCON, Please find attached

Road Requirements

SectorExisting All

Weather Roads

New Road Miles

ROM (-50/+100) Acqusition Cost New

Roads

Road Repair Miles*

ROM (-50/+100) Repair Cost New

Roads

SDC $ELC $

YUM $TCA $EPT $BBT $DRT $LRT $RGV $BLWSPW $HVMGFNDTMBUNSWBHLT

$

45PREDECISIONAL/FOR OFFICIAL USE ONLYBW11 FOIA CBP 003090

(b) (7)(E) (b) (7)(E)

(b) (5) (b) (5)

EZAISA6
Cross-Out
Page 55: From: To: Cc: Subject: FW: TI Presidential Transition (FINAL … · 2019-04-15 · Subject: FW: TI Presidential Transition (FINAL 2).pptx FENCE & ROADS ALCON, Please find attached

Road Considerations

• CBP manages an inventory of over 5,100 miles of roads identified by the U.S. Border Patrol for maintenance.– Roads are utilized for operational requirements include . Additionally, these

roads provide access to tactical infrastructure including fence and boat ramps.

• CBP is currently in the process of obtaining both real estate access and environmental clearance to ensure maintenance can be conducted on these roads. – As of November 2016, 1,509 miles are fully cleared for maintenance and the remaining 3,619 miles

are in the process of acquiring both real estate access and environmental clearance. CBP is in the process of acquiring real estate access and completing environmental clearances on the remaining 3,619 miles.

• The average cost to construct new roads is currently estimated at .– Estimate is a rough order of magnitude (-50/+100) and includes project planning and oversight,

environmental planning and compliance, environmental mitigation, real estate planning and acquisition, staffing and human capital requirements, design and construction.

• The recurring average cost to maintain existing roads is per mile, per year. – Estimates for "recurring costs" are rough order of magnitude (-50/+100) and reflect average

maintenance costs per mile of road plus environmental compliance and staffing and human capital requirements.

46PREDECISIONAL/FOR OFFICIAL USE ONLYBW11 FOIA CBP 003091

(b) (5)

(b) (5)

(b) (7)(E)

EZAISA6
Cross-Out
Page 56: From: To: Cc: Subject: FW: TI Presidential Transition (FINAL … · 2019-04-15 · Subject: FW: TI Presidential Transition (FINAL 2).pptx FENCE & ROADS ALCON, Please find attached

Other Critical TI Requirements

• Carrizo Cane Removal – Method: Mechanical with herbicide– Required in: All Laredo All Del Rio Some RGV Some El Centro

• Boat Ramps– RGV – 17 – LRT – TBD– DRT – TBD

47PREDECISIONAL/FOR OFFICIAL USE ONLYBW11 FOIA CBP 003092

EZAISA6
Cross-Out
Page 57: From: To: Cc: Subject: FW: TI Presidential Transition (FINAL … · 2019-04-15 · Subject: FW: TI Presidential Transition (FINAL 2).pptx FENCE & ROADS ALCON, Please find attached

Current Tactical Infrastructure Unfunded Requirements

• Currently identified requirements from USBP that have been documented by FM&E are listed below. USBP is currently developing their full requirements list to provide to CBP leadership. – RGV Phase 2, : . Rough Order of Magnitude (ROM) includes approximately in real estate costs.

– RGV Fence Segments O-1 – O-3, : Project includes the construction of miles of primary pedestrian fence. (Note, this mileage in ROM cost estimate includes 18 miles of roads to access the fence segments. Assumes bollard fence design and costs associated with real estate acquisition are not

included in this estimate.– ELC Fence Repair / Panel Replacement, : Project includes replacement and repair of

approximately of primary pedestrian fence. – YUM C-1 Sand Dunes All Weather Road Improvement, : Project includes of road

improvements.– TCA Organ Pipe Maintenance and Repair, : Requirement includes maintenance on the

Organ Pipe Cactus National Monument.

48PREDECISIONAL/FOR OFFICIAL USE ONLYBW11 FOIA CBP 003093

(b) (7)(E) (b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (5)(b) (5)

(b) (5)

(b) (5)

(b) (5)

(b) (5)

(b) (7)(E)

EZAISA6
Cross-Out
Page 58: From: To: Cc: Subject: FW: TI Presidential Transition (FINAL … · 2019-04-15 · Subject: FW: TI Presidential Transition (FINAL 2).pptx FENCE & ROADS ALCON, Please find attached

From:To:Subject: FW: Fence Presentation to OCC - ThursdayDate: Tuesday, November 29, 2016 3:40:57 PMAttachments:Importance: High

Should be the one doing this presentation? I’m going to review the deck but want to makesure you all have an opportunity to weigh in here.

Business OperationsOFAM / BPAM PMO

From: Sent: Tuesday, November 29, 2016 1:59 PMTo:

>Subject: Fence Presentation to OCC - ThursdayImportance: High Hi As I believe informed you, I was invited to present to OCC on Thursday afternoon.I have given this presentation a number of times at OCC’s request for their new attorneys and fornew DOJ and USACE attorneys…albeit in a slightly different format.However, this time I will not just be presenting to new attorneys, I’ll be speaking to most of theiroffice here in DC. As you’ll see, I didn’t invent new slides per se, I pulled from our new BPAM 101 brief which provided, a couple slides from our recent C2 brief, and a few slides I prepared for recent PMRs.OCC’s desire was for me to cover fence, with a focus on real estate of course.That said, I’ll lead off by briefly introducing the new BPAM organization – I will not spend much timeon that though. Please let me know if the power point is good-to-go, or if you require any amendments. Thank you in advance! Very Respectfully,

, MBA PMPReal Estate Program Manager

BW11 FOIA CBP 003094

(b) (6), (b) (7)(C)(b) (6), (b) (7)(C)

(b) (6), (b) (7)(C)

(b) (6), (b) (7)(C)

(b) (6), (b) (7)(C)

(b) (6), (b) (7)(C)

(b) (6), (b) (7)(C)

(b) (6), (b) (7)(C)

(b) (6), (b) (7)(C)

(b) (6), (b) (7)(C)

(b) (6), (b) (7)(C)

(b) (5)

(b) (5)

Page 59: From: To: Cc: Subject: FW: TI Presidential Transition (FINAL … · 2019-04-15 · Subject: FW: TI Presidential Transition (FINAL 2).pptx FENCE & ROADS ALCON, Please find attached

LMI Government ConsultingBorder Patrol Air and MarineProgram Management OfficeFacilities Management and EngineeringU.S. Customs and Border Protection

Excel as a trusted strategic partner enhancingBorder Patrol's proud legacy.

BW11 FOIA CBP 003095

(b) (6), (b) (7)(C)

Page 60: From: To: Cc: Subject: FW: TI Presidential Transition (FINAL … · 2019-04-15 · Subject: FW: TI Presidential Transition (FINAL 2).pptx FENCE & ROADS ALCON, Please find attached

From:To:Cc:

Subject: PRINT PLEASEDate: Wednesday, November 23, 2016 12:10:54 PMAttachments: C2_TI Requirements Deck INTERNAL 11_23_2016 FINAL.pptx

Hi – Can you please print 12 copies of this in color asap? It’s a beast – be warned. Thank you,thank you! Gobble, gobble! ;-)

is also going to send you maps to print too.

Branch Chief, Communications and Workforce StrategyBorder Patrol & Air and Marine Program Management OfficeFacilities Management and EngineeringOffice of Facilities and Asset Management

BW11 FOIA CBP 003096

(b) (6), (b) (7)(C)

(b) (6), (b) (7)(C)(b) (6), (b) (7)(C)

(b) (6), (b) (7)(C)

(b) (6), (b) (7)(C)

(b) (6), (b) (7)(C)

(b) (6), (b) (7)(C)

Page 61: From: To: Cc: Subject: FW: TI Presidential Transition (FINAL … · 2019-04-15 · Subject: FW: TI Presidential Transition (FINAL 2).pptx FENCE & ROADS ALCON, Please find attached

From:To:Cc:Subject: Deck for 2 pmDate: Wednesday, November 23, 2016 12:25:20 PMAttachments: C2_TI Requirements Deck INTERNAL 11_23_2016 FINAL.pptx

Hi – Please see attached for the 2 pm deck (Overview of the Fence Follow-On Discussion). Can you pleaseattach to the invite for those calling in? Thank you. Regards,

Branch Chief, Communications and Workforce StrategyBorder Patrol & Air and Marine Program Management OfficeFacilities Management and EngineeringOffice of Facilities and Asset Management

BW11 FOIA CBP 003097

(b) (6), (b) (7)(C)

(b) (6), (b) (7)(C)(b) (6), (b) (7)(C)

(b) (6), (b) (7)(C)

(b) (6), (b) (7)(C)

(b) (6), (b) (7)(C)

(b) (6), (b) (7)(C)

Page 62: From: To: Cc: Subject: FW: TI Presidential Transition (FINAL … · 2019-04-15 · Subject: FW: TI Presidential Transition (FINAL 2).pptx FENCE & ROADS ALCON, Please find attached

From:To:

Cc:Subject: FINAL (yes, really) C2 TI deckDate: Wednesday, November 23, 2016 1:15:22 PMAttachments: C2_TI Requirements Deck INTERNAL 11_23_2016 FINAL.pptx

C2 meeting was bumped up to 2 pm EST today. Attached is the final deck. Regards,

Branch Chief, Communications and Workforce StrategyBorder Patrol & Air and Marine Program Management OfficeFacilities Management and EngineeringOffice of Facilities and Asset Management

BW11 FOIA CBP 003098

(b) (6), (b) (7)(C)

(b) (6), (b) (7)(C)

(b) (6), (b) (7)(C)

(b) (6), (b) (7)(C)

(b) (6), (b) (7)(C)

(b) (6), (b) (7)(C)

Page 63: From: To: Cc: Subject: FW: TI Presidential Transition (FINAL … · 2019-04-15 · Subject: FW: TI Presidential Transition (FINAL 2).pptx FENCE & ROADS ALCON, Please find attached

Office of Facilities and Asset Management

Overview of CBP Fence and Roads

CBP Enterprise Services

November 23, 2016

1BW11 FOIA CBP 003099

Page 64: From: To: Cc: Subject: FW: TI Presidential Transition (FINAL … · 2019-04-15 · Subject: FW: TI Presidential Transition (FINAL 2).pptx FENCE & ROADS ALCON, Please find attached

Map of Existing Fence

Please note that numbers may not add up due to rounding. Fence mileage is tracked to the thousandth decimal place.

PREDECISIONAL/FOR OFFICIAL USE ONLY 2BW11 FOIA CBP 003100

(b) (7)(E)

EZAISA6
Cross-Out
Page 65: From: To: Cc: Subject: FW: TI Presidential Transition (FINAL … · 2019-04-15 · Subject: FW: TI Presidential Transition (FINAL 2).pptx FENCE & ROADS ALCON, Please find attached

A Foundation on Which to Build Fence

• CBP was tasked with building 700 miles of “two layer” fencing on the southwest border which was later changed to meet USBP operational requirements of 654 miles of primary fence.

• This was tasked to CBP in July 2007, with over 600 miles completed by January 20, 2009.

• 654 miles of primary fence have been completed to date, with the majority of mileage completed between 2008 and 2009.

PREDECISIONAL/FOR OFFICIAL USE ONLY 3BW11 FOIA CBP 003101

EZAISA6
Cross-Out
Page 66: From: To: Cc: Subject: FW: TI Presidential Transition (FINAL … · 2019-04-15 · Subject: FW: TI Presidential Transition (FINAL 2).pptx FENCE & ROADS ALCON, Please find attached

Map of Existing & Proposed Fence

4PREDECISIONAL/FOR OFFICIAL USE ONLY

This is a high level view of proposed requirements refinements of geospatial lines in progress

BW11 FOIA CBP 003102

(b) (7)(E), (b) (5)

EZAISA6
Cross-Out
Page 67: From: To: Cc: Subject: FW: TI Presidential Transition (FINAL … · 2019-04-15 · Subject: FW: TI Presidential Transition (FINAL 2).pptx FENCE & ROADS ALCON, Please find attached

Summary of Unconstrained Operational Needs & Cost Estimates

5PREDECISIONAL/FOR OFFICIAL USE ONLY

*Some miles are operationally achievable with TI or other assets

Requirement Type New MilesAcquisition/Initial Costs ROM (-50%/+100%) Cost

20 Year Recurring Costs (Maintenance and Repair)

Total End State Cost

New Primary PF $ New VF $

Replacement Primary PF & VF $ New Secondary PF $

New Roads $ Repairs to Existing Roads $

$ Total Costs

Southwest Border

Requirement Type New MilesAR

New Primary PF $ New VF $

Replacement Primary PF & VF $New Secondary PF $

New Roads $ Repairs to Existing Roads $

$ Total Costs

BW11 FOIA CBP 003103

(b) (5)(b) (7)(E)

(b) (7)(E)

EZAISA6
Cross-Out
Page 68: From: To: Cc: Subject: FW: TI Presidential Transition (FINAL … · 2019-04-15 · Subject: FW: TI Presidential Transition (FINAL 2).pptx FENCE & ROADS ALCON, Please find attached

6

Requirement Type New MilesAcquisition/Initial Costs ROM (-50%/+100%) Cost

20 Year Recurring Costs (Maintenance and Repair)

Total End State Cost

New Primary PF $ New VF $

Replacement Primary PF & VF $ New Secondary PF $

New Roads $ Repairs to Existing Roads $

$ Total Costs

Southwest and Northern Border

PREDECISIONAL/FOR OFFICIAL USE ONLY

Summary of Unconstrained Operational Needs & Cost Estimates

Unconstrained operational needs at the beginning of the planning process do not necessarily reflect the feasibility of the ultimate execution of those needs. These miles do not reflect the critical need nor do they reflect alternate enforcement solutions.

***Statement pending USBP Approval / Edits***

BW11 FOIA CBP 003104

(b) (7)(E)

(b) (5)

EZAISA6
Cross-Out
Page 69: From: To: Cc: Subject: FW: TI Presidential Transition (FINAL … · 2019-04-15 · Subject: FW: TI Presidential Transition (FINAL 2).pptx FENCE & ROADS ALCON, Please find attached

Quickest Wins

• Replacement of 184.4 primary pedestrian and vehicle fence in El Centro, Tucson, and El Paso where CBP already has real estate access and environmental analysis has been completed.

- The right to access, construct, maintain, and repair tactical infrastructure in many areas of the border is secured through the Roosevelt Reservation: a 1907 Executive Order authorizing federal property rights within 60-feet of the international border in CA, AZ, & NM. The Roosevelt Reservation is the basis for CBP property rights along much of the border fence.

7PREDECISIONAL/FOR OFFICIAL USE ONLYBW11 FOIA CBP 003105

(b) (5)

EZAISA6
Cross-Out
Page 70: From: To: Cc: Subject: FW: TI Presidential Transition (FINAL … · 2019-04-15 · Subject: FW: TI Presidential Transition (FINAL 2).pptx FENCE & ROADS ALCON, Please find attached

8

Estimated High Level TimelineOverall Project Assumptions:1)2)3)

Construction Phase Assumptions:1)

NTP + 12 months

NTP + 24 months

NTP + 36 months

Notice to Proceed

(NTP)

PREDECISIONAL/FOR OFFICIAL USE ONLYBW11 FOIA CBP 003106

(b) (5)

(b) (5)(b) (5)

EZAISA6
Cross-Out
Page 71: From: To: Cc: Subject: FW: TI Presidential Transition (FINAL … · 2019-04-15 · Subject: FW: TI Presidential Transition (FINAL 2).pptx FENCE & ROADS ALCON, Please find attached

9

Quick Win Timeline

NTP + 12 months

NTP + 24 months

NTP + 36 months

Notice to Proceed

(NTP)

Quick Win Assumptions:12

3

Acquisition

Design

Environmental

Real Estate

PREDECISIONAL/FOR OFFICIAL USE ONLYBW11 FOIA CBP 003107

(b) (5)

(b) (5)

EZAISA6
Cross-Out
Page 72: From: To: Cc: Subject: FW: TI Presidential Transition (FINAL … · 2019-04-15 · Subject: FW: TI Presidential Transition (FINAL 2).pptx FENCE & ROADS ALCON, Please find attached

Approach to Fence Construction

• Cost: – Primary PF: per mile Average of /mile for real estate and environmental planning, construction and

construction oversight.– /mile for mileage in all Sectors except Laredo & RGV– mile for mileage in Laredo & RGV mile for environmental mitigation mile for real estate acquisition mile for staffing increases required to support the program

– Secondary PF: per mile Average of mile for real estate and environmental planning, construction and

construction oversight – also include mile for road between layers of fence mile for environmental mitigation mile for real estate acquisition mile for staffing increases required to support the program

10PREDECISIONAL/FOR OFFICIAL USE ONLYBW11 FOIA CBP 003108

(b) (5)(b) (5)

(b) (5)(b) (5)

(b) (5)

(b) (5)

(b) (5)(b) (5)

(b) (5)

(b) (5)(b) (5)

(b) (5)

(b) (5)

EZAISA6
Cross-Out
Page 73: From: To: Cc: Subject: FW: TI Presidential Transition (FINAL … · 2019-04-15 · Subject: FW: TI Presidential Transition (FINAL 2).pptx FENCE & ROADS ALCON, Please find attached

Approach to Fence Construction

• Cost (continued)– VF: per mile Average of /mile for real estate and environmental planning, construction

and construction oversight. /mile for environmental mitigation /mile for real estate acquisition /mile for staffing increases required to support the program

• Government Furnished Material (GFM) and Supply Chain:–

• Procurement–––

11PREDECISIONAL/FOR OFFICIAL USE ONLYBW11 FOIA CBP 003109

(b) (5)(b) (5)

(b) (5)(b) (5)

(b) (5)

(b) (5)

(b) (5)

EZAISA6
Cross-Out
Page 74: From: To: Cc: Subject: FW: TI Presidential Transition (FINAL … · 2019-04-15 · Subject: FW: TI Presidential Transition (FINAL 2).pptx FENCE & ROADS ALCON, Please find attached

Approach to Complete Fence Construction

• Other Considerations (slide 1 of 2)––

12PREDECISIONAL/FOR OFFICIAL USE ONLYBW11 FOIA CBP 003110

(b) (5)

EZAISA6
Cross-Out
Page 75: From: To: Cc: Subject: FW: TI Presidential Transition (FINAL … · 2019-04-15 · Subject: FW: TI Presidential Transition (FINAL 2).pptx FENCE & ROADS ALCON, Please find attached

Approach to Complete Fence Construction

• Other Considerations (slide 2 of 2)–

––

––

13PREDECISIONAL/FOR OFFICIAL USE ONLYBW11 FOIA CBP 003111

(b) (5)

EZAISA6
Cross-Out
Page 76: From: To: Cc: Subject: FW: TI Presidential Transition (FINAL … · 2019-04-15 · Subject: FW: TI Presidential Transition (FINAL 2).pptx FENCE & ROADS ALCON, Please find attached

BACKUP

14PREDECISIONAL/FOR OFFICIAL USE ONLYBW11 FOIA CBP 003112

EZAISA6
Cross-Out
Page 77: From: To: Cc: Subject: FW: TI Presidential Transition (FINAL … · 2019-04-15 · Subject: FW: TI Presidential Transition (FINAL 2).pptx FENCE & ROADS ALCON, Please find attached

Border Fence Overview

• To date, U.S. Customs and Border Protection (CBP) completed 654 miles of primary pedestrian and vehicle fence. – Border Fence provides persistent impedance to illegal cross-border activity, which offers Border Patrol

agents more time to respond to and resolve threats.– CBP has completed three main fence programs since the enactment of the Secure Fence Act in 2006:

Pedestrian Fence (PF) 70, PF 225, and Vehicle Fence (VF) 300. Any fence constructed prior to these programs is considered “legacy.”*

– Tactical Infrastructure (TI) also includes gates; roads, bridges and boat ramps; drainage structures and grates; lighting and electrical systems; and vegetation and debris removal.

*The term “legacy” is also used to define older fence designs including landing mat. These legacy designs are being assessed for replacement.Please note that numbers may not add up due to rounding. Fence mileage is tracked to the thousandth decimal place.

Vehicle FenceSector Primary Secondary Tertiary TOTAL PF TOTAL VFBig Bend (BBT)Del Rio (DRT)El Centro (ELC)El Paso (EPT)Laredo (LRT)Rio Grande Valley (RGV)San Diego (SDC)Tucson (TCA)Yuma (YUM)TOTAL

Pedestrian Fence

15PREDECISIONAL/FOR OFFICIAL USE ONLYBW11 FOIA CBP 003113

(b) (7)(E)

EZAISA6
Cross-Out
Page 78: From: To: Cc: Subject: FW: TI Presidential Transition (FINAL … · 2019-04-15 · Subject: FW: TI Presidential Transition (FINAL 2).pptx FENCE & ROADS ALCON, Please find attached

Maps – Current Fence, California

16PREDECISIONAL/FOR OFFICIAL USE ONLY

Please Note: This is a high level view of proposed requirements refinements of geospatial lines in progress

BW11 FOIA CBP 003114

(b) (7)(E)

EZAISA6
Cross-Out
Page 79: From: To: Cc: Subject: FW: TI Presidential Transition (FINAL … · 2019-04-15 · Subject: FW: TI Presidential Transition (FINAL 2).pptx FENCE & ROADS ALCON, Please find attached

Maps – Current & Proposed Fence, California

17PREDECISIONAL/FOR OFFICIAL USE ONLYBW11 FOIA CBP 003115

(b) (7)(E), (b) (5)

EZAISA6
Cross-Out
EZAISA6
Cross-Out
Page 80: From: To: Cc: Subject: FW: TI Presidential Transition (FINAL … · 2019-04-15 · Subject: FW: TI Presidential Transition (FINAL 2).pptx FENCE & ROADS ALCON, Please find attached

Maps – Current Fence, Arizona

18PREDECISIONAL/FOR OFFICIAL USE ONLY

Please Note: This is a high level view of proposed requirements refinements of geospatial lines in progress

BW11 FOIA CBP 003116

(b) (7)(E)

EZAISA6
Cross-Out
Page 81: From: To: Cc: Subject: FW: TI Presidential Transition (FINAL … · 2019-04-15 · Subject: FW: TI Presidential Transition (FINAL 2).pptx FENCE & ROADS ALCON, Please find attached

Maps – Current & Proposed Fence, Arizona

19PREDECISIONAL/FOR OFFICIAL USE ONLYBW11 FOIA CBP 003117

(b) (7)(E), (b) (5)

EZAISA6
Cross-Out
Page 82: From: To: Cc: Subject: FW: TI Presidential Transition (FINAL … · 2019-04-15 · Subject: FW: TI Presidential Transition (FINAL 2).pptx FENCE & ROADS ALCON, Please find attached

Maps – Current Fence, New Mexico

20PREDECISIONAL/FOR OFFICIAL USE ONLY

Please Note: This is a high level view of proposed requirements refinements of geospatial lines in progress

BW11 FOIA CBP 003118

(b) (7)(E)

EZAISA6
Cross-Out
Page 83: From: To: Cc: Subject: FW: TI Presidential Transition (FINAL … · 2019-04-15 · Subject: FW: TI Presidential Transition (FINAL 2).pptx FENCE & ROADS ALCON, Please find attached

Maps – Current & Proposed Fence, New Mexico

21PREDECISIONAL/FOR OFFICIAL USE ONLYBW11 FOIA CBP 003119

(b) (7)(E), (b) (5)

EZAISA6
Cross-Out
Page 84: From: To: Cc: Subject: FW: TI Presidential Transition (FINAL … · 2019-04-15 · Subject: FW: TI Presidential Transition (FINAL 2).pptx FENCE & ROADS ALCON, Please find attached

Maps – Current Fence, Texas

22PREDECISIONAL/FOR OFFICIAL USE ONLY

Please Note: This is a high level view of proposed requirements refinements of geospatial lines in progress

BW11 FOIA CBP 003120

(b) (7)(E)

EZAISA6
Cross-Out
Page 85: From: To: Cc: Subject: FW: TI Presidential Transition (FINAL … · 2019-04-15 · Subject: FW: TI Presidential Transition (FINAL 2).pptx FENCE & ROADS ALCON, Please find attached

Maps – Current & Proposed Fence Fence, Texas

23PREDECISIONAL/FOR OFFICIAL USE ONLYBW11 FOIA CBP 003121

(b) (7)(E), (b) (5)

EZAISA6
Cross-Out
Page 86: From: To: Cc: Subject: FW: TI Presidential Transition (FINAL … · 2019-04-15 · Subject: FW: TI Presidential Transition (FINAL 2).pptx FENCE & ROADS ALCON, Please find attached

Maps – Current & Proposed Fence Fence, Washington

24PREDECISIONAL/FOR OFFICIAL USE ONLYBW11 FOIA CBP 003122

(b) (7)(E), (b) (5)

EZAISA6
Cross-Out
Page 87: From: To: Cc: Subject: FW: TI Presidential Transition (FINAL … · 2019-04-15 · Subject: FW: TI Presidential Transition (FINAL 2).pptx FENCE & ROADS ALCON, Please find attached

Maps – Proposed Fence, Idaho

25PREDECISIONAL/FOR OFFICIAL USE ONLYBW11 FOIA CBP 003123

(b) (5)

EZAISA6
Cross-Out
Page 88: From: To: Cc: Subject: FW: TI Presidential Transition (FINAL … · 2019-04-15 · Subject: FW: TI Presidential Transition (FINAL 2).pptx FENCE & ROADS ALCON, Please find attached

Maps – Current & Proposed Fence, Montana

26PREDECISIONAL/FOR OFFICIAL USE ONLYBW11 FOIA CBP 003124

(b) (7)(E), (b) (5)

EZAISA6
Cross-Out
Page 89: From: To: Cc: Subject: FW: TI Presidential Transition (FINAL … · 2019-04-15 · Subject: FW: TI Presidential Transition (FINAL 2).pptx FENCE & ROADS ALCON, Please find attached

Maps – Proposed Fence, New York

27PREDECISIONAL/FOR OFFICIAL USE ONLYBW11 FOIA CBP 003125

(b) (5)

EZAISA6
Cross-Out
Page 90: From: To: Cc: Subject: FW: TI Presidential Transition (FINAL … · 2019-04-15 · Subject: FW: TI Presidential Transition (FINAL 2).pptx FENCE & ROADS ALCON, Please find attached

Maps – Proposed Fence, Vermont

28PREDECISIONAL/FOR OFFICIAL USE ONLYBW11 FOIA CBP 003126

(b) (5)

EZAISA6
Cross-Out
Page 91: From: To: Cc: Subject: FW: TI Presidential Transition (FINAL … · 2019-04-15 · Subject: FW: TI Presidential Transition (FINAL 2).pptx FENCE & ROADS ALCON, Please find attached

Maps – Proposed Fence, New Hampshire

29PREDECISIONAL/FOR OFFICIAL USE ONLYBW11 FOIA CBP 003127

(b) (5)

EZAISA6
Cross-Out
Page 92: From: To: Cc: Subject: FW: TI Presidential Transition (FINAL … · 2019-04-15 · Subject: FW: TI Presidential Transition (FINAL 2).pptx FENCE & ROADS ALCON, Please find attached

Maps – Proposed Fence, Maine

30PREDECISIONAL/FOR OFFICIAL USE ONLYBW11 FOIA CBP 003128

(b) (5)

EZAISA6
Cross-Out
Page 93: From: To: Cc: Subject: FW: TI Presidential Transition (FINAL … · 2019-04-15 · Subject: FW: TI Presidential Transition (FINAL 2).pptx FENCE & ROADS ALCON, Please find attached

Proposed New Fencing

FY16CAPABILITY

REQUIREMENTS

BLAINE

SPOKANE

HAVRE

GRAND FORKS

DETROIT

BUFFALO

SWANTON

HOULTON

MIAMI

NEW ORLEANS

DEL RIOLAREDO

RIO GRANDE VALLEY

EL PASOTUCSON

YUMA

ELCENTRO

SANDIEGO

RAMEY

BIG BEND

Proposed New Fencing

31PREDECISIONAL/FOR OFFICIAL USE ONLYBW11 FOIA CBP 003129

(b) (5)

(b) (5)

(b) (5)

(b) (5)

EZAISA6
Cross-Out
Page 94: From: To: Cc: Subject: FW: TI Presidential Transition (FINAL … · 2019-04-15 · Subject: FW: TI Presidential Transition (FINAL 2).pptx FENCE & ROADS ALCON, Please find attached

All Fence Requirements – Primary, PF & VF

32PREDECISIONAL/FOR OFFICIAL USE ONLY

Existing VF New Miles VF

ROM (-50/+100) Acquisition Cost VF

Existing Primary PF

New Miles Primary PF

ROM (-50/+100) Acquisition Cost

Primary PF

$ $

$ $ $ $ $ $ $ $

$ $ $ $ $ $ $ $

$ $

$ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $

BLWBUNDTMGFNHLT

YUMGrand Total

Sector

ELCEPTLRTRGVSDCTCA

HVMSPWSWB

Southwest Border Total

BBTDRT

Northern Border Total

BW11 FOIA CBP 003130

(b) (5) (b) (5)(b) (7)(E) (b) (7)(E)

EZAISA6
Cross-Out
Page 95: From: To: Cc: Subject: FW: TI Presidential Transition (FINAL … · 2019-04-15 · Subject: FW: TI Presidential Transition (FINAL 2).pptx FENCE & ROADS ALCON, Please find attached

All Fence Requirements –Replacement PF & Secondary PF

33PREDECISIONAL/FOR OFFICIAL USE ONLY

Replacement Miles PF

ROM (-50/+100) Acquisition Cost Replacement PF

Existing Secondary

PF

New Miles Secondary

PF

ROM (-50/+100) Acquisition Cost

Secondary PF

Existing Tertiary PF

$ $

$ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $

$ $

$ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $

BLWBUNDTMGFNHLT

YUMGrand Total

Sector

ELCEPTLRTRGVSDCTCA

HVMSPWSWB

Southwest Border Total

BBTDRT

Northern Border Total

BW11 FOIA CBP 003131

(b) (7)(E) (b) (7)(E) (b) (7)(E)

(b) (5) (b) (5)

EZAISA6
Cross-Out
Page 96: From: To: Cc: Subject: FW: TI Presidential Transition (FINAL … · 2019-04-15 · Subject: FW: TI Presidential Transition (FINAL 2).pptx FENCE & ROADS ALCON, Please find attached

Border Fence Photos – Legacy for Replacement

34

Pedestrian Fence – Legacy Pedestrian Fence – Bollard & Legacy

PREDECISIONAL/FOR OFFICIAL USE ONLYBW11 FOIA CBP 003132

(b) (7)(E)

(b) (7)(E)

EZAISA6
Cross-Out
Page 97: From: To: Cc: Subject: FW: TI Presidential Transition (FINAL … · 2019-04-15 · Subject: FW: TI Presidential Transition (FINAL 2).pptx FENCE & ROADS ALCON, Please find attached

Border Fence Photos – VF Designs

35

Vehicle Fence – Post/RailVehicle Fence – Normandy

PREDECISIONAL/FOR OFFICIAL USE ONLYBW11 FOIA CBP 003133

(b) (7)(E) (b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

EZAISA6
Cross-Out
Page 98: From: To: Cc: Subject: FW: TI Presidential Transition (FINAL … · 2019-04-15 · Subject: FW: TI Presidential Transition (FINAL 2).pptx FENCE & ROADS ALCON, Please find attached

Border Fence Photos – Floating Fence Design

36

Pedestrian Fence – Floating Fence – El Centro Sector

PREDECISIONAL/FOR OFFICIAL USE ONLYBW11 FOIA CBP 003134

EZAISA6
Cross-Out
Page 99: From: To: Cc: Subject: FW: TI Presidential Transition (FINAL … · 2019-04-15 · Subject: FW: TI Presidential Transition (FINAL 2).pptx FENCE & ROADS ALCON, Please find attached

Border Fence Photos – Preferred PF Design

37

Pedestrian Fence – PV-1 Bollard Tucson Sector

PREDECISIONAL/FOR OFFICIAL USE ONLYBW11 FOIA CBP 003135

EZAISA6
Cross-Out
Page 100: From: To: Cc: Subject: FW: TI Presidential Transition (FINAL … · 2019-04-15 · Subject: FW: TI Presidential Transition (FINAL 2).pptx FENCE & ROADS ALCON, Please find attached

Border Fence Photos – Preferred PF Design

38

Pedestrian Fence – PV-1 Bollard Tucson Sector Pedestrian Fence – PV-1 Bollard Yuma Sector

PREDECISIONAL/FOR OFFICIAL USE ONLYBW11 FOIA CBP 003136

EZAISA6
Cross-Out
Page 101: From: To: Cc: Subject: FW: TI Presidential Transition (FINAL … · 2019-04-15 · Subject: FW: TI Presidential Transition (FINAL 2).pptx FENCE & ROADS ALCON, Please find attached

Border Fence Photos – Levee Wall

39

Pedestrian “Flevee” – Fence on Levee

PREDECISIONAL/FOR OFFICIAL USE ONLYBW11 FOIA CBP 003137

EZAISA6
Cross-Out
Page 102: From: To: Cc: Subject: FW: TI Presidential Transition (FINAL … · 2019-04-15 · Subject: FW: TI Presidential Transition (FINAL 2).pptx FENCE & ROADS ALCON, Please find attached

Approach to Fence Construction

• Costs to Construct Primary PF (same for fence replacement costs)– On average, cost to construct primary pedestrian or replace primary pedestrian fence is

approximately per mile. – Estimate is a rough order of magnitude (-50/+100) and includes project planning and oversight,

environmental planning and compliance, environmental mitigation, real estate planning and acquisition, staffing and human capital requirements, design and construction.

• Cost to Construct Secondary PF– On average, cost to construct secondary PF is approximately per mile.– Estimate is a rough order of magnitude (-50/+100) and includes project planning and oversight,

environmental planning and compliance, environmental mitigation, real estate planning and acquisition, staffing and human capital requirements, design and construction.

• Costs to Construct VF – On average, cost to construct vehicle fence fence is approximately per mile. – Estimate is a rough order of magnitude (-50/+100) and includes project planning and oversight,

environmental planning and compliance, environmental mitigation, real estate planning and acquisition, staffing and human capital requirements, design and construction.

40PREDECISIONAL/FOR OFFICIAL USE ONLYBW11 FOIA CBP 003138

(b) (5)

(b) (5)

(b) (5)(b) (5)

EZAISA6
Cross-Out
Page 103: From: To: Cc: Subject: FW: TI Presidential Transition (FINAL … · 2019-04-15 · Subject: FW: TI Presidential Transition (FINAL 2).pptx FENCE & ROADS ALCON, Please find attached

Approach to Fence Construction

• Legal Considerations–

41PREDECISIONAL/FOR OFFICIAL USE ONLYBW11 FOIA CBP 003139

(b) (5)

Page 104: From: To: Cc: Subject: FW: TI Presidential Transition (FINAL … · 2019-04-15 · Subject: FW: TI Presidential Transition (FINAL 2).pptx FENCE & ROADS ALCON, Please find attached

Approach to Complete Fence Construction

• Government Furnished Material (GFM) and Supply Chain:– The Buy American Act restricts the purchase of supplies that are not domestic products requiring

50% of the components to be produced in the U.S. Exceptions include non-availability and unreasonable costs. In order to purchase steel at a

reasonable cost, the CBP Head of Contracting Activity (HCA) will need to utilize FAR Part 25.2 to make a determination on cost reasonableness. Without a determination of cost reasonableness, there is a high risk of extremely high costs for steel.

– In order to ensure steel availability on time, at a lower cost and to avoid contractors competing for materials, CBP will establish a Supply Chain Management contract to purchase and deliver steel to the sites. Contract will be similar to the Boeing contract utilized during the prior fence construction programs.

• Procurement– CBP continues to work with its service providers to establish Multiple Award Task Order Contracts

(MATOC) and Indefinite Delivery Indefinite Quantity (IDIQ) Contracts to allow for an expedited contract award process for fence construction. Currently the existing contract vehicles allow for $167M in capacity for design and $162M in capacity for construction.

42PREDECISIONAL/FOR OFFICIAL USE ONLYBW11 FOIA CBP 003140

Page 105: From: To: Cc: Subject: FW: TI Presidential Transition (FINAL … · 2019-04-15 · Subject: FW: TI Presidential Transition (FINAL 2).pptx FENCE & ROADS ALCON, Please find attached

Approach to Complete Fence Construction

• Other Considerations:

43PREDECISIONAL/FOR OFFICIAL USE ONLYBW11 FOIA CBP 003141

(b) (5)

EZAISA6
Cross-Out
Page 106: From: To: Cc: Subject: FW: TI Presidential Transition (FINAL … · 2019-04-15 · Subject: FW: TI Presidential Transition (FINAL 2).pptx FENCE & ROADS ALCON, Please find attached

Border Fence Background

• Section 102(b) of the Illegal Immigration Reform and Immigrant Responsibility Act of 1996 (IIRIRA), as amended, authorizes the Department of Homeland Security (DHS) to construct border infrastructure, including fencing, in locations where such infrastructure would be most practical and effective in deterring illegal entry on the southwest border.

• The purpose of border fence construction is to provide persistent impedance to illegal cross-border activity, which offers Border Patrol agents more time to respond to and resolve threats.

• To date, CBP completed 654 miles of primary pedestrian and vehicle fencing along the southwest border: approximately 354 miles of pedestrian fence and 300 miles of vehicle fence at the cost of approximately $2.3 billion.

• It is important to note that tactical infrastructure (TI) also includes roads; and bridges; drainage structures and grates; lighting and electrical systems; vegetation and deb moval; and tower real property, construction and maintenance.

44PREDECISIONAL/FOR OFFICIAL USE ONLYBW11 FOIA CBP 003142

(b) (7)(E)(b) (7)(E)

(b) (7)(E)

EZAISA6
Cross-Out
Page 107: From: To: Cc: Subject: FW: TI Presidential Transition (FINAL … · 2019-04-15 · Subject: FW: TI Presidential Transition (FINAL 2).pptx FENCE & ROADS ALCON, Please find attached

Road Requirements

SectorExisting All

Weather Roads

New Road Miles

ROM (-50/+100) Acqusition Cost New

Roads

Road Repair Miles*

ROM (-50/+100) Repair Cost New

Roads

SDC $ELC $

YUM $TCA $EPT $BBT $DRT $LRT $RGV $BLWSPW $HVMGFNDTMBUNSWBHLT

$

45PREDECISIONAL/FOR OFFICIAL USE ONLYBW11 FOIA CBP 003143

(b) (7)(E) (b) (7)(E)(b) (5) (b) (5)

EZAISA6
Cross-Out
Page 108: From: To: Cc: Subject: FW: TI Presidential Transition (FINAL … · 2019-04-15 · Subject: FW: TI Presidential Transition (FINAL 2).pptx FENCE & ROADS ALCON, Please find attached

Road Considerations

• CBP manages an inventory of over 5,100 miles of roads identified by the U.S. Border Patrol for maintenance.– Roads are utilized for operational requirements include . Additionally, these

roads provide access to tactical infrastructure including fence and boat ramps.

• CBP is currently in the process of obtaining both real estate access and environmental clearance to ensure maintenance can be conducted on these roads. – As of November 2016, 1,509 miles are fully cleared for maintenance and the remaining 3,619 miles

are in the process of acquiring both real estate access and environmental clearance. CBP is in the process of acquiring real estate access and completing environmental clearances on the remaining 3,619 miles.

• The average cost to construct new roads is currently estimated at – Estimate is a rough order of magnitude (-50/+100) and includes project planning and oversight,

environmental planning and compliance, environmental mitigation, real estate planning and acquisition, staffing and human capital requirements, design and construction.

• The recurring average cost to maintain existing roads is per mile, per year. – Estimates for "recurring costs" are rough order of magnitude (-50/+100) and reflect average

maintenance costs per mile of road plus environmental compliance and staffing and human capital requirements.

46PREDECISIONAL/FOR OFFICIAL USE ONLYBW11 FOIA CBP 003144

(b) (5)

(b) (5)

(b) (7)(E)

EZAISA6
Cross-Out
Page 109: From: To: Cc: Subject: FW: TI Presidential Transition (FINAL … · 2019-04-15 · Subject: FW: TI Presidential Transition (FINAL 2).pptx FENCE & ROADS ALCON, Please find attached

Other Critical TI Requirements

• Carrizo Cane Removal – Method: Mechanical with herbicide– Required in: All Laredo All Del Rio Some RGV Some El Centro

• Boat Ramps– RGV – 17 – LRT – TBD– DRT – TBD

47PREDECISIONAL/FOR OFFICIAL USE ONLYBW11 FOIA CBP 003145

EZAISA6
Cross-Out
Page 110: From: To: Cc: Subject: FW: TI Presidential Transition (FINAL … · 2019-04-15 · Subject: FW: TI Presidential Transition (FINAL 2).pptx FENCE & ROADS ALCON, Please find attached

Current Tactical Infrastructure Unfunded Requirements

• Currently identified requirements from USBP that have been documented by FM&E are listed below. USBP is currently developing their full requirements list to provide to CBP leadership. – RGV Phase 2, : . Rough Order of Magnitude (ROM) includes approximately in real estate costs.

– RGV Fence Segments O-1 – O-3, Project includes the construction of miles of primary pedestrian fence. (Note, this mileage in ROM cost estimate includes 18 miles of roads to access the fence segments. Assumes bollard fence design and costs associated with real estate acquisition are not

included in this estimate.– ELC Fence Repair / Panel Replacement, Project includes replacement and repair of

approximately of primary pedestrian fence. – YUM C-1 Sand Dunes All Weather Road Improvement, : Project includes of road

improvements.– TCA Organ Pipe Maintenance and Repair, : Requirement includes maintenance on the

Organ Pipe Cactus National Monument.

48PREDECISIONAL/FOR OFFICIAL USE ONLYBW11 FOIA CBP 003146

(b) (5)

(b) (5)

(b) (5)

(b) (5)

(b) (5)

(b) (5)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

EZAISA6
Cross-Out
Page 111: From: To: Cc: Subject: FW: TI Presidential Transition (FINAL … · 2019-04-15 · Subject: FW: TI Presidential Transition (FINAL 2).pptx FENCE & ROADS ALCON, Please find attached

From:To:Cc:Subject: FW: Send these to Date: Thursday, January 19, 2017 3:25:17 PMAttachments: Proposed_Fence_20170113.xlsx

Requirements Definitions 01132017.pptx

 Attached is the weekly update with the proposed fence spreadsheet. Also attached is the draftrequirements definition ppt. please let me know your thoughts on the requirements definition andwe can get it ready for higher levels of leadership. Thanks! 

Business OperationsOFAM / BPAM PMO

               

 

BW11 FOIA CBP 003147

(b) (6), (b) (7)(C)(b) (6), (b) (7)(C)

(b) (6), (b) (7)(C)

(b) (6), (b) (7)(C)

(b) (6), (b) (7)(C)

(b) (6), (b) (7)(C)

(b) (6), (b) (7)(C)

(b) (7)(E)

Page 112: From: To: Cc: Subject: FW: TI Presidential Transition (FINAL … · 2019-04-15 · Subject: FW: TI Presidential Transition (FINAL 2).pptx FENCE & ROADS ALCON, Please find attached

Sector C++ C+ OMB

BBT ‐ Big Bend

Primary PF

Primary VF

Secondary PF

Replacement PF

VF to PF

Total

BLW ‐ Blaine

Primary PF

Primary VF

Secondary PF

Replacement PF

VF to PF

Total

DRT ‐ Del Rio

Primary PF

Primary VF

Secondary PF

Replacement PF

VF to PF

Total

ELC ‐  El Centro

Primary PF

Primary VF

Secondary PF

Replacement PF

VF to PF

Total

EPT ‐ El Paso

Primary PF

Primary VF

Secondary PF

Replacement PF

VF to PF

Total

HVM ‐ Havre

Primary PF

Primary VF

Secondary PF

Replacement PF

BW11 FOIA CBP 003148

(b) (7)(E)

Page 113: From: To: Cc: Subject: FW: TI Presidential Transition (FINAL … · 2019-04-15 · Subject: FW: TI Presidential Transition (FINAL 2).pptx FENCE & ROADS ALCON, Please find attached

VF to PF

Total

HLT ‐ Houlton

Primary PF

Primary VF

Secondary PF

Replacement PF

VF to PF

Total

LRT ‐ Laredo

Primary PF

Primary VF

Secondary PF

Replacement PF

VF to PF

Total

RGV ‐ Rio Grande Valley

Primary PF

Primary VF

Secondary PF

Replacement PF

VF to PF

Total

SDC ‐  San Diego

Primary PF

Primary VF

Secondary PF

Replacement PF

VF to PF

Total

SPW ‐ Spokane

Primary PF

Primary VF

Secondary PF

Replacement PF

VF to PF

Total

SWB ‐ Swanton

Primary PF

Primary VF

Secondary PF

BW11 FOIA CBP 003149

(b) (7)(E)

Page 114: From: To: Cc: Subject: FW: TI Presidential Transition (FINAL … · 2019-04-15 · Subject: FW: TI Presidential Transition (FINAL 2).pptx FENCE & ROADS ALCON, Please find attached

Replacement PF

VF to PF

Total

TCA ‐ Tuscon

Primary PF

Primary VF

Secondary PF

Replacement PF

VF to PF

Total

YUM ‐ Yuma

Primary PF

Primary VF

Secondary PF

Replacement PF

VF to PF

Total

BW11 FOIA CBP 003150

(b) (7)(E)

Page 115: From: To: Cc: Subject: FW: TI Presidential Transition (FINAL … · 2019-04-15 · Subject: FW: TI Presidential Transition (FINAL 2).pptx FENCE & ROADS ALCON, Please find attached

Primary PF C++BBT

BLW

DRT

ELC

EPT

HVM

HLT

LRT

RGV

SDC

SPW

SWB

TCA

YUM

Total

Primary VFBBT

BLW

DRT

ELC

EPT

HVM

HLT

LRT

RGV

SDC

SPW

SWB

TCA

YUM

Total

Secondary PFBBT

BLW

DRT

ELC

EPT

HVM

HLT

LRT

RGV

SDC

SPW

BW11 FOIA CBP 003151

(b) (7)(E)

Page 116: From: To: Cc: Subject: FW: TI Presidential Transition (FINAL … · 2019-04-15 · Subject: FW: TI Presidential Transition (FINAL 2).pptx FENCE & ROADS ALCON, Please find attached

SWB

TCA

YUM

Total

Replacement PFBBT

BLW

DRT

ELC

EPT

HVM

HLT

LRT

RGV

SDC

SPW

SWB

TCA

YUM

Total

VF to PFBBT

BLW

DRT

ELC

EPT

HVM

HLT

LRT

RGV

SDC

SPW

SWB

TCA

YUM

Total

BW11 FOIA CBP 003152

(b) (7)(E)

Page 117: From: To: Cc: Subject: FW: TI Presidential Transition (FINAL … · 2019-04-15 · Subject: FW: TI Presidential Transition (FINAL 2).pptx FENCE & ROADS ALCON, Please find attached

Sector Fence_ID Length_Miles Lat_Start Long_Start Lat_End Long_End

BBT

BBT

BLW

BLW

BLW

DRT

DRT

DRT

DRT

DRT

ELC

ELC

ELC

ELC

ELC

ELC

ELC

EPT

EPT

EPT

EPT

EPT

EPT

EPT

EPT

EPT

EPT

EPT

EPT

EPT

EPT

EPT

EPT

EPT

EPT

EPT

EPT

EPT

EPT

EPT

EPT

EPT

BW11 FOIA CBP 003153

(b) (7)(E)

Page 118: From: To: Cc: Subject: FW: TI Presidential Transition (FINAL … · 2019-04-15 · Subject: FW: TI Presidential Transition (FINAL 2).pptx FENCE & ROADS ALCON, Please find attached

HLT

HLT

HLT

HLT

HLT

HLT

HLT

HLT

HLT

HLT

HLT

HLT

HLT

HLT

HLT

HLT

HLT

HLT

HLT

HLT

HLT

HLT

HLT

HLT

HLT

HLT

HLT

HLT

HLT

HLT

HLT

HLT

HLT

HLT

HLT

HLT

HVM

HVM

HVM

HVM

HVM

HVM

HVM

BW11 FOIA CBP 003154

(b) (7)(E)

Page 119: From: To: Cc: Subject: FW: TI Presidential Transition (FINAL … · 2019-04-15 · Subject: FW: TI Presidential Transition (FINAL 2).pptx FENCE & ROADS ALCON, Please find attached

HVM

HVM

HVM

HVM

HVM

HVM

HVM

HVM

HVM

HVM

HVM

HVM

HVM

HVM

HVM

HVM

HVM

HVM

HVM

HVM

HVM

HVM

HVM

HVM

HVM

HVM

HVM

HVM

HVM

HVM

HVM

HVM

HVM

HVM

HVM

HVM

HVM

LRT

LRT

LRT

LRT

LRT

LRT

BW11 FOIA CBP 003155

(b) (7)(E)

Page 120: From: To: Cc: Subject: FW: TI Presidential Transition (FINAL … · 2019-04-15 · Subject: FW: TI Presidential Transition (FINAL 2).pptx FENCE & ROADS ALCON, Please find attached

LRT

LRT

LRT

LRT

LRT

LRT

LRT

LRT

LRT

LRT

LRT

LRT

LRT

LRT

RGV

RGV

RGV

RGV

RGV

RGV

RGV

RGV

RGV

RGV

RGV

RGV

RGV

RGV

RGV

RGV

RGV

RGV

RGV

RGV

RGV

RGV

RGV

RGV

RGV

RGV

RGV

RGV

RGV

BW11 FOIA CBP 003156

(b) (7)(E)

Page 121: From: To: Cc: Subject: FW: TI Presidential Transition (FINAL … · 2019-04-15 · Subject: FW: TI Presidential Transition (FINAL 2).pptx FENCE & ROADS ALCON, Please find attached

RGV

SDC

SDC

SDC

SDC

SDC

SDC

SDC

SDC

SDC

SDC

SDC

SDC

SDC

SDC

SDC

SDC

SDC

SDC

SDC

SDC

SDC

SDC

SDC

SDC

SDC

SDC

SDC

SDC

SDC

SDC

SDC

SDC

SDC

SDC

SDC

SDC

SDC

SPW

SPW

SPW

SPW

SPW

BW11 FOIA CBP 003157

(b) (7)(E)

Page 122: From: To: Cc: Subject: FW: TI Presidential Transition (FINAL … · 2019-04-15 · Subject: FW: TI Presidential Transition (FINAL 2).pptx FENCE & ROADS ALCON, Please find attached

SPW

SPW

SPW

SPW

SPW

SPW

SPW

SPW

SPW

SPW

SPW

SPW

SPW

SPW

SPW

SPW

SPW

SPW

SPW

SPW

SPW

SPW

SPW

SPW

SPW

SPW

SPW

SPW

SPW

SPW

SPW

SPW

SPW

SPW

SWB

SWB

SWB

SWB

SWB

SWB

SWB

SWB

SWB

BW11 FOIA CBP 003158

(b) (7)(E)

Page 123: From: To: Cc: Subject: FW: TI Presidential Transition (FINAL … · 2019-04-15 · Subject: FW: TI Presidential Transition (FINAL 2).pptx FENCE & ROADS ALCON, Please find attached

SWB

SWB

SWB

SWB

SWB

SWB

SWB

SWB

SWB

SWB

SWB

SWB

SWB

SWB

SWB

SWB

SWB

SWB

SWB

SWB

SWB

SWB

SWB

SWB

SWB

SWB

SWB

SWB

TCA

TCA

TCA

TCA

TCA

TCA

TCA

TCA

TCA

TCA

TCA

TCA

TCA

TCA

TCA

BW11 FOIA CBP 003159

(b) (7)(E)

Page 124: From: To: Cc: Subject: FW: TI Presidential Transition (FINAL … · 2019-04-15 · Subject: FW: TI Presidential Transition (FINAL 2).pptx FENCE & ROADS ALCON, Please find attached

TCA

TCA

TCA

TCA

TCA

TCA

TCA

TCA

TCA

TCA

TCA

YUM

YUM

YUM

YUM

YUM

YUM

BW11 FOIA CBP 003160

(b) (7)(E)

Page 125: From: To: Cc: Subject: FW: TI Presidential Transition (FINAL … · 2019-04-15 · Subject: FW: TI Presidential Transition (FINAL 2).pptx FENCE & ROADS ALCON, Please find attached

OBJECTID *Shape * Fence_ID DescriptionLat_Start Long_Start Lat_End Long_End Fence_ProgOperationaLength_MilComments State Sector Station RE_Status ENV_StatusClearance_ ConstrainedShape.STLength()

Polyline Pedestrian  Unconst. PFOperationa  New PUnknown USBP ‐ Big  Unknown ( No No <Null> <Null>

Polyline Vehicle Bar Unconst. V Operationa New VeUnknown USBP ‐ Big  Unknown ( No No <Null> <Null>

Polyline PF SecondaOperationa New SecoUnknown USBP ‐ El CeUnknown ( Yes Yes Existing ‐ P <Null>

Polyline PF SecondaOperationa New SecoUnknown USBP ‐ El CeUnknown ( Yes Yes Existing ‐ P <Null>

Polyline PF SecondaOperationa New SecoUnknown USBP ‐ El CeUnknown ( Yes Yes Existing ‐ P <Null>

Polyline PF SecondaOperationa New SecoUnknown USBP ‐ El CeUnknown ( Yes Yes Existing ‐ P <Null>

Polyline PF SecondaOperationa New SecoUnknown USBP ‐ El CeUnknown ( Yes Yes Existing ‐ P <Null>

Polyline PF SecondaOperationa New SecoUnknown USBP ‐ El CeUnknown ( Yes Yes Existing ‐ P <Null>

Polyline PF SecondaOperationa New SecoUnknown USBP ‐ El CeUnknown ( Yes Yes Existing ‐ P <Null>

Polyline PF SecondaOperationa New SecoUnknown USBP ‐ El CeUnknown ( Yes Yes Existing ‐ P <Null>

Polyline PF SecondaOperationa New SecoUnknown USBP ‐ El CeUnknown ( Yes Yes Existing ‐ P <Null>

Polyline PF SecondaOperationa New SecoUnknown USBP ‐ El CeUnknown ( Yes Yes Existing ‐ P <Null>

Polyline PF SecondaOperationa New SecoUnknown USBP ‐ El CeUnknown ( Yes Yes Existing ‐ P <Null>

Polyline PF Replace Replaceme ReplacemUnknown USBP ‐ El CeUnknown ( Yes Yes <Null> No

Polyline PF Replace Replaceme ReplacemUnknown USBP ‐ El CeUnknown ( Yes Yes <Null> No

Polyline PF Replace Replaceme ReplacemUnknown USBP ‐ El CeUnknown ( Yes Yes <Null> No

Polyline PF Replace Replaceme ReplacemUnknown USBP ‐ El CeUnknown ( Yes Yes <Null> No

Polyline PF Replace Replaceme ReplacemUnknown USBP ‐ El CeUnknown ( Yes Yes <Null> No

Polyline PF Replace Replaceme ReplacemUnknown USBP ‐ El CeUnknown ( Yes Yes <Null> No

Polyline PF Replace Replaceme ReplacemUnknown USBP ‐ El CeUnknown ( Yes Yes <Null> No

Polyline PF Replace Replaceme ReplacemUnknown USBP ‐ El CeUnknown ( Yes Yes <Null> No

Polyline PF Replace Replaceme ReplacemUnknown USBP ‐ El CeUnknown ( Yes Yes <Null> No

Polyline PF Replace Replaceme ReplacemUnknown USBP ‐ El CeUnknown ( Yes Yes <Null> No

Polyline PF Replace Replaceme ReplacemUnknown USBP ‐ El CeUnknown ( Yes Yes <Null> No

Polyline PF Replace Replaceme ReplaceUnknown USBP ‐ El CeUnknown ( Yes Yes <Null> No

Polyline PF Replace Replaceme ReplaceUnknown USBP ‐ El CeUnknown ( Yes Yes <Null> No

Polyline PF Replace Replaceme ReplaceUnknown USBP ‐ El CeUnknown ( Yes Yes <Null> No

Polyline PF Replace Replaceme ReplaceUnknown USBP ‐ El CeUnknown ( Yes Yes <Null> No

Polyline PF Replace Replaceme ReplaceUnknown USBP ‐ El CeUnknown ( Yes Yes <Null> No

Polyline PF Replace Replaceme ReplaceUnknown USBP ‐ El CeUnknown ( Yes Yes <Null> No

Polyline PF Replace Replaceme ReplaceUnknown USBP ‐ El CeUnknown ( Yes Yes <Null> No

Polyline PF Replace Replaceme ReplaceUnknown USBP ‐ El CeUnknown ( Yes Yes <Null> No

Polyline PF Replace Replaceme ReplaceUnknown USBP ‐ El CeUnknown ( Yes Yes <Null> No

Polyline PF Replace Replaceme ReplaceUnknown USBP ‐ El CeUnknown ( Yes Yes <Null> No

Polyline PF Replace Replaceme ReplaceUnknown USBP ‐ El CeUnknown ( Yes Yes <Null> No

Polyline PF Replace Replaceme ReplaceUnknown USBP ‐ El CeUnknown ( Yes Yes <Null> No

Polyline PF Replace Replaceme ReplaceUnknown USBP ‐ El CeUnknown ( Yes Yes <Null> No

Polyline PF Replace Replaceme ReplaceUnknown USBP ‐ El CeUnknown ( Yes Yes <Null> No

Polyline PF Replace Replaceme ReplaceUnknown USBP ‐ El CeUnknown ( Yes Yes <Null> No

Polyline PF Replace Replaceme ReplaceUnknown USBP ‐ El CeUnknown ( Yes Yes <Null> No

Polyline PF Replace Replaceme ReplaceUnknown USBP ‐ El CeUnknown ( Yes Yes <Null> No

Polyline PF Replace Replaceme ReplaceUnknown USBP ‐ El CeUnknown ( Yes Yes <Null> No

Polyline PF Replace Replaceme ReplaceUnknown USBP ‐ El CeUnknown ( Yes Yes <Null> No

Polyline PF Replace Replaceme ReplaceUnknown USBP ‐ El CeUnknown ( Yes Yes <Null> No

Polyline PF SecondaOperationa New SeUnknown USBP ‐ El CeUnknown ( Yes Yes Existing ‐ P <Null>

Polyline PF SecondaOperationa New SeUnknown USBP ‐ El CeUnknown ( Yes Yes Existing ‐ P <Null>

Polyline PF SecondaOperationa New SeUnknown USBP ‐ El CeUnknown ( Yes Yes Existing ‐ P <Null>

Polyline PF SecondaOperationa New SeUnknown USBP ‐ El CeUnknown ( Yes Yes Existing ‐ P <Null>

Polyline PF SecondaOperationa New SeUnknown USBP ‐ El CeUnknown ( Yes Yes Existing ‐ P <Null>

Polyline PF SecondaOperationa New SeUnknown USBP ‐ El CeUnknown ( Yes Yes Existing ‐ P <Null>

Polyline PF SecondaOperationa New SeUnknown USBP ‐ El CeUnknown ( Yes Yes Existing ‐ P <Null>

Polyline PF SecondaOperationa New SeUnknown USBP ‐ El CeUnknown ( Yes Yes Existing ‐ P <Null>

Polyline PF SecondaOperationa New SeUnknown USBP ‐ El CeUnknown ( Yes Yes Existing ‐ P <Null>

Polyline PF SecondaOperationa New SeUnknown USBP ‐ El CeUnknown ( Yes Yes Existing ‐ P <Null>

Polyline PF SecondaOperationa New SeUnknown USBP ‐ El CeUnknown ( Yes Yes Existing ‐ P <Null>

Polyline PF SecondaOperationa New SeUnknown USBP ‐ El CeUnknown ( Yes Yes Existing ‐ P <Null>

Polyline PF SecondaOperationa New SeUnknown USBP ‐ El CeUnknown ( Yes Yes Existing ‐ P <Null>

Polyline PF SecondaOperationa New SeUnknown USBP ‐ El CeUnknown ( Yes Yes Existing ‐ P <Null>

Polyline PF SecondaOperationa New SeUnknown USBP ‐ El CeUnknown ( Yes Yes Existing ‐ P <Null>

Polyline PF SecondaOperationa New SeUnknown USBP ‐ El CeUnknown ( Yes Yes Existing ‐ P <Null>

Polyline PF SecondaOperationa New SeUnknown USBP ‐ El CeUnknown ( Yes Yes Existing ‐ P <Null>

Polyline PF SecondaOperationa New SeUnknown USBP ‐ El CeUnknown ( Yes Yes Existing ‐ P <Null>

Polyline PF SecondaOperationa New SeUnknown USBP ‐ El CeUnknown ( Yes Yes Existing ‐ P <Null>

Polyline PF SecondaOperationa New SeUnknown USBP ‐ El CeUnknown ( Yes Yes Existing ‐ P <Null>

Polyline VF to PF VF to PF Revised pe Unknown USBP ‐ El CeUnknown ( Yes Yes <Null> Yes

Polyline VF to PF VF to PF Revised pe Unknown USBP ‐ El CeUnknown ( Yes Yes <Null> Yes

Polyline VF to PF VF to PF Revised pe Unknown USBP ‐ El CeUnknown ( Yes Yes <Null> Yes

Polyline VF to PF VF to PF Revised pe Unknown USBP ‐ El CeUnknown ( Yes Yes <Null> Yes

Polyline VF to PF VF to PF Revised pe Unknown USBP ‐ El CeUnknown ( Yes Yes <Null> Yes

Polyline PF Primary Operationa  New Pri Unknown USBP ‐ El CeUnknown ( No No <Null> <Null>

BW11 FOIA CBP 003161

(b) (7)(E) (b) (7)(E)

(b) (7)(E)(b) (7)(E)(b) (7)(E) (b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

Page 126: From: To: Cc: Subject: FW: TI Presidential Transition (FINAL … · 2019-04-15 · Subject: FW: TI Presidential Transition (FINAL 2).pptx FENCE & ROADS ALCON, Please find attached

Polyline PF Primary Operationa New Pri Unknown USBP ‐ El CeUnknown ( No No <Null> <Null>

Polyline PF Primary Operationa New Pri Unknown USBP ‐ El CeUnknown ( Yes No <Null> <Null>

Polyline PF Primary Operationa New Pri Unknown USBP ‐ El CeUnknown ( No No <Null> <Null>

Polyline PF Primary Operationa New PUnknown USBP ‐ El PaUnknown ( No No <Null> No

Polyline PF Primary Operationa New PUnknown USBP ‐ El PaUnknown ( Yes No <Null> No

Polyline PF Primary Operationa New PUnknown USBP ‐ El PaUnknown ( Yes No <Null> No

Polyline PF Primary Operationa New PUnknown USBP ‐ El PaUnknown ( Yes No <Null> No

Polyline PF Primary Operationa New PUnknown USBP ‐ El PaUnknown ( Yes No <Null> No

Polyline PF Primary Operationa New PUnknown USBP ‐ El PaUnknown ( Yes No <Null> No

Polyline PF Replace Replaceme Revised pe Unknown USBP ‐ El PaUnknown ( Yes Yes <Null> No

Polyline PF Replace Replaceme Revised pe Unknown USBP ‐ El PaUnknown ( Yes Yes <Null> No

Polyline PF Replace Replaceme Revised pe Unknown USBP ‐ El PaUnknown ( Yes Yes <Null> No

Polyline PF Replace Replaceme Revised pe Unknown USBP ‐ El PaUnknown ( Yes Yes <Null> No

Polyline PF Replace Replaceme Revised pe Unknown USBP ‐ El PaUnknown ( Yes Yes <Null> No

Polyline PF Primary Operationa New Unknown USBP ‐ El PaUnknown ( No No <Null> <Null>

Polyline PF Primary Operationa New Unknown USBP ‐ El PaUnknown ( Yes No <Null> <Null>

Polyline PF Primary Operationa New Unknown USBP ‐ El PaUnknown ( No No <Null> <Null>

Polyline PF Primary Operationa New Unknown USBP ‐ El PaUnknown ( Yes No <Null> <Null>

Polyline Unconst. PFOperationa New Unknown USBP ‐ El PaUnknown ( Yes No <Null> <Null>

Polyline Unconst. PFOperationa New Unknown USBP ‐ El PaUnknown ( Yes No <Null> <Null>

Polyline Unconst. PFOperationa New Unknown USBP ‐ El PaUnknown ( Yes No <Null> <Null>

Polyline Unconst. PFOperationa New Unknown USBP ‐ El PaUnknown ( Yes No <Null> <Null>

Polyline Unconst. PFOperationa New Unknown USBP ‐ El PaUnknown ( Yes No <Null> <Null>

Polyline Unconst. PFOperationa New Unknown USBP ‐ El PaUnknown ( Yes No <Null> <Null>

Polyline Unconst. PFOperationa New Unknown USBP ‐ El PaUnknown ( Yes No <Null> <Null>

Polyline Unconst. PFOperationa New Unknown USBP ‐ El PaUnknown ( Yes No <Null> <Null>

Polyline Unconst. PFOperationa New Unknown USBP ‐ El PaUnknown ( Yes No <Null> <Null>

Polyline Unconst. PFOperationa New Unknown USBP ‐ El PaUnknown ( Yes No <Null> <Null>

Polyline Unconst. PFOperationa New Unknown USBP ‐ El PaUnknown ( No No <Null> <Null>

Polyline Unconst. PFOperationa New Unknown USBP ‐ El PaUnknown ( Yes No <Null> <Null>

Polyline Unconst. PFOperationa New Unknown USBP ‐ El PaUnknown ( No No <Null> <Null>

Polyline Unconst. PFOperationa New Unknown USBP ‐ El PaUnknown ( Yes No <Null> <Null>

Polyline Unconst. PFOperationa New Unknown USBP ‐ El PaUnknown ( No No <Null> <Null>

Polyline Unconst. PFOperationa New Unknown USBP ‐ El PaUnknown ( Yes No <Null> <Null>

Polyline Unconst. PFOperationa New Unknown USBP ‐ El PaUnknown ( No No <Null> <Null>

Polyline Unconst. PFOperationa New Unknown USBP ‐ El PaUnknown ( Yes No <Null> <Null>

Polyline Unconst. PFOperationa New Unknown USBP ‐ El PaUnknown ( No No <Null> <Null>

Polyline Unconst. PFOperationa New Unknown USBP ‐ El PaUnknown ( Yes No <Null> <Null>

Polyline Unconst. PFOperationa New Unknown USBP ‐ El PaUnknown ( No No <Null> <Null>

Polyline Unconst. PFOperationa New Unknown USBP ‐ El PaUnknown ( Yes No <Null> <Null>

Polyline Unconst. PFOperationa New Unknown USBP ‐ El PaUnknown ( No No <Null> <Null>

Polyline Unconst. PFOperationa New Unknown USBP ‐ El PaUnknown ( Yes No <Null> <Null>

Polyline Unconst. PFOperationa New Unknown USBP ‐ El PaUnknown ( No No <Null> <Null>

Polyline Unconst. PFOperationa New Unknown USBP ‐ El PaUnknown ( Yes No <Null> <Null>

Polyline Unconst. PFOperationa New Unknown USBP ‐ El PaUnknown ( No No <Null> <Null>

Polyline Unconst. PFOperationa New Unknown USBP ‐ El PaUnknown ( Yes No <Null> <Null>

Polyline Unconst. PFOperationa New Unknown USBP ‐ El PaUnknown ( No No <Null> <Null>

Polyline Unconst. PFOperationa New Unknown USBP ‐ El PaUnknown ( Yes No <Null> <Null>

Polyline Unconst. PFOperationa New Unknown USBP ‐ El PaUnknown ( No No <Null> <Null>

Polyline Unconst. PFOperationa New Unknown USBP ‐ El PaUnknown ( Yes No <Null> <Null>

Polyline Unconst. PFOperationa New Unknown USBP ‐ El PaUnknown ( No No <Null> <Null>

Polyline Unconst. PFOperationa New Unknown USBP ‐ El PaUnknown ( Yes No <Null> <Null>

Polyline Unconst. PFOperationa New Unknown USBP ‐ El PaUnknown ( No No <Null> <Null>

Polyline Unconst. PFOperationa New Unknown USBP ‐ El PaUnknown ( Yes No <Null> <Null>

Polyline Unconst. PFOperationa New Unknown USBP ‐ El PaUnknown ( No No <Null> <Null>

Polyline Unconst. PFOperationa New Unknown USBP ‐ El PaUnknown ( Yes No <Null> <Null>

Polyline Unconst. PFOperationa New Unknown USBP ‐ El PaUnknown ( No No <Null> <Null>

Polyline Unconst. PFOperationa New Unknown USBP ‐ El PaUnknown ( Yes No <Null> <Null>

Polyline Unconst. PFOperationa New Unknown USBP ‐ El PaUnknown ( No No <Null> <Null>

Polyline Unconst. PFOperationa New Unknown USBP ‐ El PaUnknown ( Yes No <Null> <Null>

Polyline Unconst. PFOperationa New Unknown USBP ‐ El PaUnknown ( Yes No <Null> <Null>

Polyline Unconst. PFOperationa New Unknown USBP ‐ El PaUnknown ( Yes No <Null> <Null>

Polyline Unconst. PFOperationa New Unknown USBP ‐ El PaUnknown ( Yes No <Null> <Null>

Polyline Unconst. PFOperationa New Unknown USBP ‐ El PaUnknown ( Yes No <Null> <Null>

Polyline Unconst. PFOperationa New Unknown USBP ‐ El PaUnknown ( Yes No <Null> <Null>

Polyline Unconst. PFOperationa New Unknown USBP ‐ El PaUnknown ( Yes No <Null> <Null>

Polyline Unconst. PFOperationa New Unknown USBP ‐ El PaUnknown ( Yes No <Null> <Null>

Polyline Unconst. PFOperationa New Unknown USBP ‐ El PaUnknown ( Yes No <Null> <Null>

Polyline Unconst. PFOperationa New Unknown USBP ‐ El PaUnknown ( Yes No <Null> <Null>

Polyline Unconst. PFOperationa New Unknown USBP ‐ El PaUnknown ( Yes No <Null> <Null>

Polyline Unconst. PFOperationa New Unknown USBP ‐ El PaUnknown ( Yes No <Null> <Null>

BW11 FOIA CBP 003162

(b) (7)(E)

(b) (7)(E)(b) (7)(E) (b) (7)(E)(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

Page 127: From: To: Cc: Subject: FW: TI Presidential Transition (FINAL … · 2019-04-15 · Subject: FW: TI Presidential Transition (FINAL 2).pptx FENCE & ROADS ALCON, Please find attached

Polyline Unconst. PFOperationa New Unknown USBP ‐ El PaUnknown ( Yes No <Null> <Null>

Polyline Unconst. PFOperationa New Unknown USBP ‐ El PaUnknown ( No No <Null> <Null>

Polyline Unconst. PFOperationa New Unknown USBP ‐ El PaUnknown ( Yes No <Null> <Null>

Polyline Unconst. PFOperationa New Unknown USBP ‐ El PaUnknown ( No No <Null> <Null>

Polyline Unconst. PFOperationa New Unknown USBP ‐ El PaUnknown ( Yes No <Null> <Null>

Polyline Unconst. PFOperationa New Unknown USBP ‐ El PaUnknown ( No No <Null> <Null>

Polyline Unconst. PFOperationa New Unknown USBP ‐ El PaUnknown ( Yes No <Null> <Null>

Polyline Unconst. PFOperationa New Unknown USBP ‐ El PaUnknown ( No No <Null> <Null>

Polyline Unconst. PFOperationa New Unknown USBP ‐ El PaUnknown ( Yes No <Null> <Null>

Polyline Unconst. PFOperationa New Unknown USBP ‐ El PaUnknown ( Yes No <Null> <Null>

Polyline Unconst. PFOperationa New Unknown USBP ‐ El PaUnknown ( Yes No <Null> <Null>

Polyline Unconst. PFOperationa New Unknown USBP ‐ El PaUnknown ( Yes No <Null> <Null>

Polyline Unconst. PFOperationa New Unknown USBP ‐ El PaUnknown ( Yes No <Null> <Null>

Polyline Unconst. PFOperationa New Unknown USBP ‐ El PaUnknown ( Yes No <Null> <Null>

Polyline Unconst. PFOperationa New Unknown USBP ‐ El PaUnknown ( Yes No <Null> <Null>

Polyline Unconst. PFOperationa New Unknown USBP ‐ El PaUnknown ( Yes No <Null> <Null>

Polyline Unconst. PFOperationa New Unknown USBP ‐ El PaUnknown ( Yes No <Null> <Null>

Polyline Unconst. PFOperationa New Unknown USBP ‐ El PaUnknown ( Yes No <Null> <Null>

Polyline Unconst. PFOperationa New Unknown USBP ‐ El PaUnknown ( No No <Null> <Null>

Polyline Unconst. PFOperationa New Unknown USBP ‐ El PaUnknown ( Yes No <Null> <Null>

Polyline Unconst. PFOperationa New Unknown USBP ‐ El PaUnknown ( No No <Null> <Null>

Polyline Unconst. PFOperationa New Unknown USBP ‐ El PaUnknown ( Yes No <Null> <Null>

Polyline Unconst. PFOperationa New Unknown USBP ‐ El PaUnknown ( No No <Null> <Null>

Polyline Unconst. PFOperationa New Unknown USBP ‐ El PaUnknown ( Yes No <Null> <Null>

Polyline Unconst. PFOperationa New Unknown USBP ‐ El PaUnknown ( No No <Null> <Null>

Polyline Unconst. PFOperationa New Unknown USBP ‐ El PaUnknown ( Yes No <Null> <Null>

Polyline Unconst. PFOperationa New Unknown USBP ‐ El PaUnknown ( No No <Null> <Null>

Polyline Unconst. PFOperationa New Unknown USBP ‐ El PaUnknown ( Yes No <Null> <Null>

Polyline Unconst. PFOperationa New Unknown USBP ‐ El PaUnknown ( No No <Null> <Null>

Polyline Unconst. PFOperationa New Unknown USBP ‐ El PaUnknown ( Yes No <Null> <Null>

Polyline Unconst. PFOperationa New Unknown USBP ‐ El PaUnknown ( No No <Null> <Null>

Polyline Unconst. PFOperationa New Unknown USBP ‐ El PaUnknown ( Yes No <Null> <Null>

Polyline Unconst. PFOperationa New Unknown USBP ‐ El PaUnknown ( No No <Null> <Null>

Polyline Unconst. PFOperationa New Unknown USBP ‐ El PaUnknown ( Yes No <Null> <Null>

Polyline Unconst. PFOperationa New Unknown USBP ‐ El PaUnknown ( Yes No <Null> <Null>

Polyline Unconst. PFOperationa New Unknown USBP ‐ El PaUnknown ( Yes No <Null> <Null>

Polyline Unconst. PFOperationa New Unknown USBP ‐ El PaUnknown ( No No <Null> <Null>

Polyline Unconst. PFOperationa New Unknown USBP ‐ El PaUnknown ( Yes No <Null> <Null>

Polyline Unconst. PFOperationa New Unknown USBP ‐ El PaUnknown ( No No <Null> <Null>

Polyline Unconst. PFOperationa New Unknown USBP ‐ El PaUnknown ( Yes No <Null> <Null>

Polyline Unconst. PFOperationa New Unknown USBP ‐ El PaUnknown ( No No <Null> <Null>

Polyline Unconst. PFOperationa New Unknown USBP ‐ El PaUnknown ( Yes No <Null> <Null>

Polyline Unconst. PFOperationa New Unknown USBP ‐ El PaUnknown ( No No <Null> <Null>

Polyline Unconst. PFOperationa New Unknown USBP ‐ El PaUnknown ( Yes No <Null> <Null>

Polyline Unconst. PFOperationa New Unknown USBP ‐ El PaUnknown ( No No <Null> <Null>

Polyline Unconst. PFOperationa New Unknown USBP ‐ El PaUnknown ( Yes No <Null> <Null>

Polyline Unconst. PFOperationa New Unknown USBP ‐ El PaUnknown ( Yes No <Null> <Null>

Polyline PF Primary Operationa New PUnknown USBP ‐ El PaUnknown ( No No <Null> <Null>

Polyline PF Primary Operationa New PUnknown USBP ‐ El PaUnknown ( No No <Null> <Null>

Polyline PF Primary Operationa New PUnknown USBP ‐ El PaUnknown ( Yes No <Null> <Null>

Polyline PF Primary Operationa New PUnknown USBP ‐ El PaUnknown ( No No <Null> <Null>

Polyline PF Primary Operationa New PUnknown USBP ‐ El PaUnknown ( Yes No <Null> <Null>

Polyline PF Primary Operationa New PUnknown USBP ‐ El PaUnknown ( No No <Null> <Null>

Polyline PF Primary Operationa New PUnknown USBP ‐ El PaUnknown ( Yes No <Null> <Null>

Polyline PF Primary Operationa New PUnknown USBP ‐ El PaUnknown ( No No <Null> <Null>

Polyline PF Primary Operationa New PUnknown USBP ‐ El PaUnknown ( Yes No <Null> <Null>

Polyline PF Primary Operationa New PUnknown USBP ‐ El PaUnknown ( No No <Null> <Null>

Polyline PF Primary Operationa New PUnknown USBP ‐ El PaUnknown ( Yes No <Null> <Null>

Polyline PF Primary Operationa New PUnknown USBP ‐ El PaUnknown ( No No <Null> <Null>

Polyline PF Primary Operationa New PUnknown USBP ‐ El PaUnknown ( Yes No <Null> <Null>

Polyline PF Primary Operationa New PUnknown USBP ‐ El PaUnknown ( No No <Null> <Null>

Polyline PF Primary Operationa New PUnknown USBP ‐ El PaUnknown ( Yes No <Null> <Null>

Polyline PF Primary Operationa New PUnknown USBP ‐ El PaUnknown ( No No <Null> <Null>

Polyline PF Primary Operationa New PUnknown USBP ‐ El PaUnknown ( Yes No <Null> <Null>

Polyline PF Primary Operationa New PUnknown USBP ‐ El PaUnknown ( No No <Null> <Null>

Polyline PF Primary Operationa New PUnknown USBP ‐ El PaUnknown ( Yes No <Null> <Null>

Polyline PF Primary Operationa New PUnknown USBP ‐ El PaUnknown ( No No <Null> <Null>

Polyline PF Primary Operationa New PUnknown USBP ‐ El PaUnknown ( Yes No <Null> <Null>

Polyline PF Primary Operationa New PUnknown USBP ‐ El PaUnknown ( No No <Null> <Null>

Polyline PF Primary Operationa New PUnknown USBP ‐ El PaUnknown ( Yes No <Null> <Null>

Polyline PF Primary Operationa New PUnknown USBP ‐ El PaUnknown ( No No <Null> <Null>

BW11 FOIA CBP 003163

(b) (7)(E)

(b) (7)(E)(b) (7)(E) (b) (7)(E)(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

EZAISA6
Sticky Note
None set by EZAISA6
EZAISA6
Sticky Note
MigrationNone set by EZAISA6
EZAISA6
Sticky Note
Unmarked set by EZAISA6
EZAISA6
Sticky Note
None set by EZAISA6
EZAISA6
Sticky Note
MigrationNone set by EZAISA6
EZAISA6
Sticky Note
Unmarked set by EZAISA6
EZAISA6
Sticky Note
None set by EZAISA6
EZAISA6
Sticky Note
MigrationNone set by EZAISA6
EZAISA6
Sticky Note
Unmarked set by EZAISA6
EZAISA6
Sticky Note
None set by EZAISA6
EZAISA6
Sticky Note
MigrationNone set by EZAISA6
EZAISA6
Sticky Note
Unmarked set by EZAISA6
Page 128: From: To: Cc: Subject: FW: TI Presidential Transition (FINAL … · 2019-04-15 · Subject: FW: TI Presidential Transition (FINAL 2).pptx FENCE & ROADS ALCON, Please find attached

Polyline PF Primary Operationa New PUnknown USBP ‐ El PaUnknown ( Yes No <Null> <Null>

Polyline PF Primary Operationa New PUnknown USBP ‐ El PaUnknown ( No No <Null> <Null>

Polyline PF Primary Operationa New PUnknown USBP ‐ El PaUnknown ( Yes No <Null> <Null>

Polyline PF Primary Operationa New PUnknown USBP ‐ El PaUnknown ( No No <Null> <Null>

Polyline PF Primary Operationa New PUnknown USBP ‐ El PaUnknown ( Yes No <Null> <Null>

Polyline PF Primary Operationa New PUnknown USBP ‐ El PaUnknown ( No No <Null> <Null>

Polyline PF Primary Operationa New PUnknown USBP ‐ El PaUnknown ( Yes No <Null> <Null>

Polyline PF Primary Operationa New PUnknown USBP ‐ El PaUnknown ( No No <Null> <Null>

Polyline PF Primary Operationa New PUnknown USBP ‐ El PaUnknown ( Yes No <Null> <Null>

Polyline PF Primary Operationa New PUnknown USBP ‐ El PaUnknown ( No No <Null> <Null>

Polyline PF Primary Operationa New PUnknown USBP ‐ El PaUnknown ( Yes No <Null> <Null>

Polyline PF Primary Operationa New PUnknown USBP ‐ El PaUnknown ( No No <Null> <Null>

Polyline PF Primary Operationa New PUnknown USBP ‐ El PaUnknown ( Yes No <Null> <Null>

Polyline PF Primary Operationa New PUnknown USBP ‐ El PaUnknown ( No No <Null> <Null>

Polyline PF Primary Operationa New PUnknown USBP ‐ El PaUnknown ( Yes No <Null> <Null>

Polyline PF Primary Operationa New PUnknown USBP ‐ El PaUnknown ( No No <Null> <Null>

Polyline PF Primary Operationa New PUnknown USBP ‐ El PaUnknown ( Yes No <Null> <Null>

Polyline PF Primary Operationa New PUnknown USBP ‐ El PaUnknown ( No No <Null> <Null>

Polyline PF Primary Operationa New PUnknown USBP ‐ El PaUnknown ( Yes No <Null> <Null>

Polyline PF Primary Operationa New PUnknown USBP ‐ El PaUnknown ( No No <Null> <Null>

Polyline PF Primary Operationa New PUnknown USBP ‐ El PaUnknown ( Yes No <Null> <Null>

Polyline PF Primary Operationa New PUnknown USBP ‐ El PaUnknown ( No No <Null> <Null>

Polyline PF Primary Operationa New PUnknown USBP ‐ El PaUnknown ( Yes No <Null> <Null>

Polyline PF Primary Operationa New PUnknown USBP ‐ El PaUnknown ( No No <Null> <Null>

Polyline PF Primary Operationa New PUnknown USBP ‐ El PaUnknown ( Yes No <Null> <Null>

Polyline PF Primary Operationa New PUnknown USBP ‐ El PaUnknown ( No No <Null> <Null>

Polyline PF Primary Operationa New PUnknown USBP ‐ El PaUnknown ( Yes No <Null> <Null>

Polyline PF Primary Operationa New PUnknown USBP ‐ El PaUnknown ( No No <Null> <Null>

Polyline PF Primary Operationa New PUnknown USBP ‐ El PaUnknown ( Yes No <Null> <Null>

Polyline PF Primary Operationa New PUnknown USBP ‐ El PaUnknown ( No No <Null> <Null>

Polyline PF Primary Operationa New PUnknown USBP ‐ El PaUnknown ( Yes No <Null> <Null>

Polyline PF Primary Operationa New PUnknown USBP ‐ El PaUnknown ( No No <Null> <Null>

Polyline PF Primary Operationa New PUnknown USBP ‐ El PaUnknown ( Yes No <Null> <Null>

Polyline PF Primary Operationa New PUnknown USBP ‐ El PaUnknown ( No No <Null> <Null>

Polyline PF Primary Operationa New PUnknown USBP ‐ El PaUnknown ( Yes No <Null> <Null>

Polyline PF Primary Operationa New PUnknown USBP ‐ El PaUnknown ( No No <Null> <Null>

Polyline PF Primary Operationa New PUnknown USBP ‐ El PaUnknown ( Yes No <Null> <Null>

Polyline PF Primary Operationa New PUnknown USBP ‐ El PaUnknown ( No No <Null> <Null>

Polyline PF Primary Operationa New PUnknown USBP ‐ El PaUnknown ( Yes No <Null> <Null>

Polyline PF Primary Operationa New PUnknown USBP ‐ El PaUnknown ( No No <Null> <Null>

Polyline PF Primary Operationa New PUnknown USBP ‐ El PaUnknown ( Yes No <Null> <Null>

Polyline PF Primary Operationa New PUnknown USBP ‐ El PaUnknown ( No No <Null> <Null>

Polyline PF Primary Operationa New PUnknown USBP ‐ El PaUnknown ( Yes No <Null> <Null>

Polyline PF Primary Operationa New PUnknown USBP ‐ El PaUnknown ( No No <Null> <Null>

Polyline PF Primary Operationa New PUnknown USBP ‐ El PaUnknown ( Yes No <Null> <Null>

Polyline PF Primary Operationa New PUnknown USBP ‐ El PaUnknown ( No No <Null> <Null>

Polyline PF Primary Operationa New PUnknown USBP ‐ El PaUnknown ( Yes No <Null> <Null>

Polyline PF Primary Operationa New PUnknown USBP ‐ El PaUnknown ( No No <Null> <Null>

Polyline PF Primary Operationa New PUnknown USBP ‐ El PaUnknown ( Yes No <Null> <Null>

Polyline PF Primary Operationa New PUnknown USBP ‐ El PaUnknown ( No No <Null> <Null>

Polyline PF Primary Operationa New PUnknown USBP ‐ El PaUnknown ( Yes No <Null> <Null>

Polyline PF Primary Operationa New PUnknown USBP ‐ El PaUnknown ( No No <Null> <Null>

Polyline PF Primary Operationa New PUnknown USBP ‐ El PaUnknown ( Yes No <Null> <Null>

Polyline PF Primary Operationa New PUnknown USBP ‐ El PaUnknown ( No No <Null> <Null>

Polyline PF Primary Operationa New PUnknown USBP ‐ El PaUnknown ( Yes No <Null> <Null>

Polyline PF Primary Operationa New PUnknown USBP ‐ El PaUnknown ( No No <Null> <Null>

Polyline PF Primary Operationa New PUnknown USBP ‐ El PaUnknown ( Yes No <Null> <Null>

Polyline PF Primary Operationa New PUnknown USBP ‐ El PaUnknown ( No No <Null> <Null>

Polyline PF Primary Operationa New PUnknown USBP ‐ El PaUnknown ( Yes No <Null> <Null>

Polyline PF Primary Operationa New PUnknown USBP ‐ El PaUnknown ( No No <Null> <Null>

Polyline PF Primary Operationa New PUnknown USBP ‐ El PaUnknown ( Yes No <Null> <Null>

Polyline PF Primary Operationa New PUnknown USBP ‐ El PaUnknown ( No No <Null> <Null>

Polyline PF Primary Operationa New PUnknown USBP ‐ El PaUnknown ( Yes No <Null> <Null>

Polyline PF Primary Operationa New PUnknown USBP ‐ El PaUnknown ( No No <Null> <Null>

Polyline PF Primary Operationa New PUnknown USBP ‐ El PaUnknown ( Yes No <Null> <Null>

Polyline PF Primary Operationa New PUnknown USBP ‐ El PaUnknown ( No No <Null> <Null>

Polyline PF Primary Operationa New PUnknown USBP ‐ El PaUnknown ( Yes No <Null> <Null>

Polyline PF Primary Operationa New PUnknown USBP ‐ El PaUnknown ( No No <Null> <Null>

Polyline PF Primary Operationa New PUnknown USBP ‐ El PaUnknown ( Yes No <Null> <Null>

Polyline PF Primary Operationa New PUnknown USBP ‐ El PaUnknown ( No No <Null> <Null>

Polyline PF Primary Operationa New PUnknown USBP ‐ El PaUnknown ( Yes No <Null> <Null>

BW11 FOIA CBP 003164

(b) (7)(E)

(b) (7)(E)(b) (7)(E) (b) (7)(E)(b) (7)(E)(b) (7)(E)

(b) (7)(E)

EZAISA6
Sticky Note
None set by EZAISA6
EZAISA6
Sticky Note
MigrationNone set by EZAISA6
EZAISA6
Sticky Note
Unmarked set by EZAISA6
EZAISA6
Sticky Note
None set by EZAISA6
EZAISA6
Sticky Note
MigrationNone set by EZAISA6
EZAISA6
Sticky Note
Unmarked set by EZAISA6
EZAISA6
Sticky Note
None set by EZAISA6
EZAISA6
Sticky Note
MigrationNone set by EZAISA6
EZAISA6
Sticky Note
Unmarked set by EZAISA6
EZAISA6
Sticky Note
None set by EZAISA6
EZAISA6
Sticky Note
MigrationNone set by EZAISA6
EZAISA6
Sticky Note
Unmarked set by EZAISA6
Page 129: From: To: Cc: Subject: FW: TI Presidential Transition (FINAL … · 2019-04-15 · Subject: FW: TI Presidential Transition (FINAL 2).pptx FENCE & ROADS ALCON, Please find attached

Polyline PF Primary Operationa ew PUnknown USBP ‐ El PaUnknown ( No No <Null> <Null>

Polyline PF Primary Operationa ew PUnknown USBP ‐ El PaUnknown ( Yes No <Null> <Null>

Polyline PF Primary Operationa ew PUnknown USBP ‐ El PaUnknown ( No No <Null> <Null>

Polyline PF Primary Operationa ew PUnknown USBP ‐ El PaUnknown ( Yes No <Null> <Null>

Polyline PF Primary Operationa ew PUnknown USBP ‐ El PaUnknown ( No No <Null> <Null>

Polyline PF Primary Operationa ew PUnknown USBP ‐ El PaUnknown ( Yes No <Null> <Null>

Polyline PF Primary Operationa ew PUnknown USBP ‐ El PaUnknown ( No No <Null> <Null>

Polyline PF Primary Operationa ew PUnknown USBP ‐ El PaUnknown ( Yes No <Null> <Null>

Polyline PF Primary Operationa ew PUnknown USBP ‐ El PaUnknown ( No No <Null> <Null>

Polyline PF Primary Operationa ew PUnknown USBP ‐ El PaUnknown ( Yes No <Null> <Null>

Polyline PF Primary Operationa ew PUnknown USBP ‐ El PaUnknown ( No No <Null> <Null>

Polyline PF Primary Operationa ew PUnknown USBP ‐ El PaUnknown ( Yes No <Null> <Null>

Polyline PF Primary Operationa ew PUnknown USBP ‐ El PaUnknown ( No No <Null> <Null>

Polyline PF Primary Operationa ew PUnknown USBP ‐ El PaUnknown ( Yes No <Null> <Null>

Polyline PF Primary Operationa ew PUnknown USBP ‐ El PaUnknown ( No No <Null> <Null>

Polyline PF Primary Operationa ew PUnknown USBP ‐ El PaUnknown ( Yes No <Null> <Null>

Polyline PF Primary Operationa ew PUnknown USBP ‐ El PaUnknown ( No No <Null> <Null>

Polyline PF Primary Operationa ew PUnknown USBP ‐ El PaUnknown ( Yes No <Null> <Null>

Polyline PF Primary Operationa ew PUnknown USBP ‐ El PaUnknown ( No No <Null> <Null>

Polyline PF Primary Operationa ew PUnknown USBP ‐ El PaUnknown ( Yes No <Null> <Null>

Polyline PF Primary Operationa ew PUnknown USBP ‐ El PaUnknown ( No No <Null> <Null>

Polyline PF Primary Operationa ew PUnknown USBP ‐ El PaUnknown ( Yes No <Null> <Null>

Polyline PF Primary Operationa ew PUnknown USBP ‐ El PaUnknown ( No No <Null> <Null>

Polyline PF Primary Operationa ew PUnknown USBP ‐ El PaUnknown ( Yes No <Null> <Null>

Polyline PF Primary Operationa ew PUnknown USBP ‐ El PaUnknown ( No No <Null> <Null>

Polyline PF Primary Operationa ew PUnknown USBP ‐ El PaUnknown ( Yes No <Null> <Null>

Polyline PF Primary Operationa ew PUnknown USBP ‐ El PaUnknown ( No No <Null> <Null>

Polyline PF Primary Operationa ew PUnknown USBP ‐ El PaUnknown ( Yes No <Null> <Null>

Polyline PF Primary Operationa ew PUnknown USBP ‐ El PaUnknown ( No No <Null> <Null>

Polyline PF Primary Operationa ew PUnknown USBP ‐ El PaUnknown ( Yes No <Null> <Null>

Polyline PF Primary Operationa ew PUnknown USBP ‐ El PaUnknown ( No No <Null> <Null>

Polyline PF Primary Operationa ew PUnknown USBP ‐ El PaUnknown ( Yes No <Null> <Null>

Polyline PF Primary Operationa ew PUnknown USBP ‐ El PaUnknown ( No No <Null> <Null>

Polyline PF Primary Operationa ew PUnknown USBP ‐ El PaUnknown ( Yes No <Null> <Null>

Polyline PF Primary Operationa ew PUnknown USBP ‐ El PaUnknown ( No No <Null> <Null>

Polyline PF Primary Operationa ew PUnknown USBP ‐ El PaUnknown ( Yes No <Null> <Null>

Polyline PF Primary Operationa ew PUnknown USBP ‐ El PaUnknown ( No No <Null> <Null>

Polyline PF Primary Operationa ew PUnknown USBP ‐ El PaUnknown ( Yes No <Null> <Null>

Polyline PF Primary Operationa ew PUnknown USBP ‐ El PaUnknown ( No No <Null> <Null>

Polyline PF Primary Operationa ew PUnknown USBP ‐ El PaUnknown ( Yes No <Null> <Null>

Polyline PF Primary Operationa ew PUnknown USBP ‐ El PaUnknown ( No No <Null> <Null>

Polyline PF Primary Operationa ew PUnknown USBP ‐ El PaUnknown ( Yes No <Null> <Null>

Polyline PF Primary Operationa ew PUnknown USBP ‐ El PaUnknown ( No No <Null> <Null>

Polyline PF Primary Operationa ew PUnknown USBP ‐ El PaUnknown ( Yes No <Null> <Null>

Polyline PF Primary Operationa Revised pe Unknown USBP ‐ El PaUnknown ( No No <Null> No

Polyline PF Primary Operationa Revised pe Unknown USBP ‐ El PaUnknown ( Yes No <Null> No

Polyline PF Primary Operationa Revised pe Unknown USBP ‐ El PaUnknown ( Yes No <Null> <Null>

Polyline PF Primary Operationa  New Unknown USBP ‐ El PaUnknown ( No No <Null> <Null>

Polyline PF Primary Operationa  New Unknown USBP ‐ El PaUnknown ( No No <Null> <Null>

Polyline PF Primary Operationa  New Unknown USBP ‐ El PaUnknown ( Yes No <Null> <Null>

Polyline PF Primary Operationa  New Unknown USBP ‐ El PaUnknown ( No No <Null> <Null>

Polyline PF Primary Operationa  New Unknown USBP ‐ El PaUnknown ( Yes No <Null> <Null>

Polyline VF to PF VF to PF Revised pe Unknown USBP ‐ El PaUnknown ( Yes Yes <Null> Yes

Polyline VF to PF VF to PF Revised pe Unknown USBP ‐ El PaUnknown ( Yes Yes <Null> Yes

Polyline VF to PF VF to PF Revised pe Unknown USBP ‐ El PaUnknown ( Yes Yes <Null> Yes

Polyline VF to PF VF to PF Revised pe Unknown USBP ‐ El PaUnknown ( Yes Yes <Null> Yes

Polyline VF to PF VF to PF Revised pe Unknown USBP ‐ El PaUnknown ( Yes Yes <Null> Yes

Polyline VF to PF VF to PF Revised pe Unknown USBP ‐ El PaUnknown ( Yes Yes <Null> Yes

Polyline VF to PF VF to PF Revised pe Unknown USBP ‐ El PaUnknown ( Yes Yes <Null> Yes

Polyline VF to PF VF to PF Revised pe Unknown USBP ‐ El PaUnknown ( Yes Yes <Null> Yes

Polyline VF to PF VF to PF Revised pe Unknown USBP ‐ El PaUnknown ( Yes Yes <Null> Yes

Polyline VF to PF VF to PF Revised pe Unknown USBP ‐ El PaUnknown ( Yes Yes <Null> Yes

Polyline VF to PF VF to PF Revised pe Unknown USBP ‐ El PaUnknown ( Yes Yes <Null> Yes

Polyline VF to PF VF to PF Revised pe Unknown USBP ‐ El PaUnknown ( Yes Yes <Null> Yes

Polyline VF to PF VF to PF Revised pe Unknown USBP ‐ El PaUnknown ( Yes Yes <Null> Yes

Polyline VF to PF VF to PF Revised pe Unknown USBP ‐ El PaUnknown ( Yes Yes <Null> Yes

Polyline VF to PF VF to PF Revised pe Unknown USBP ‐ El PaUnknown ( Yes Yes <Null> Yes

Polyline VF to PF VF to PF Revised pe Unknown USBP ‐ El PaUnknown ( Yes Yes <Null> Yes

Polyline VF to PF VF to PF Revised pe Unknown USBP ‐ El PaUnknown ( Yes Yes <Null> Yes

Polyline VF to PF VF to PF Revised pe Unknown USBP ‐ El PaUnknown ( Yes Yes <Null> Yes

Polyline VF to PF VF to PF Revised pe Unknown USBP ‐ El PaUnknown ( Yes Yes <Null> Yes

BW11 FOIA CBP 003165

(b) (7)(E)

(b) (7)(E)(b) (7)(E) (b) (7)(E)(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

EZAISA6
Sticky Note
None set by EZAISA6
EZAISA6
Sticky Note
MigrationNone set by EZAISA6
EZAISA6
Sticky Note
Unmarked set by EZAISA6
EZAISA6
Sticky Note
None set by EZAISA6
EZAISA6
Sticky Note
MigrationNone set by EZAISA6
EZAISA6
Sticky Note
Unmarked set by EZAISA6
EZAISA6
Sticky Note
None set by EZAISA6
EZAISA6
Sticky Note
MigrationNone set by EZAISA6
EZAISA6
Sticky Note
Unmarked set by EZAISA6
EZAISA6
Sticky Note
None set by EZAISA6
EZAISA6
Sticky Note
MigrationNone set by EZAISA6
EZAISA6
Sticky Note
Unmarked set by EZAISA6
Page 130: From: To: Cc: Subject: FW: TI Presidential Transition (FINAL … · 2019-04-15 · Subject: FW: TI Presidential Transition (FINAL 2).pptx FENCE & ROADS ALCON, Please find attached

Polyline VF to PF VF to PF Revised pe Unknown USBP ‐ El PaUnknown ( Yes Yes <Null> Yes

Polyline VF to PF VF to PF Revised pe Unknown USBP ‐ El PaUnknown ( Yes Yes <Null> Yes

Polyline PF SecondaOperationa  New Unknown USBP ‐ El PaUnknown ( Yes No <Null> <Null>

Polyline PF SecondaOperationa  New Unknown USBP ‐ El PaUnknown ( Yes Yes <Null> <Null>

Polyline PF SecondaOperationa  New Unknown USBP ‐ El PaUnknown ( Yes Yes <Null> <Null>

Polyline PF SecondaOperationa  New Unknown USBP ‐ El PaUnknown ( Yes Yes <Null> <Null>

Polyline PF SecondaOperationa  New Unknown USBP ‐ El PaUnknown ( Yes Yes <Null> <Null>

Polyline PF SecondaOperationa  New Unknown USBP ‐ El PaUnknown ( Yes Yes <Null> <Null>

Polyline PF SecondaOperationa  New Unknown USBP ‐ El PaUnknown ( Yes Yes <Null> <Null>

Polyline PF SecondaOperationa  New Unknown USBP ‐ El PaUnknown ( Yes Yes <Null> <Null>

Polyline PF SecondaOperationa  New Unknown USBP ‐ El PaUnknown ( Yes Yes <Null> <Null>

Polyline PF SecondaOperationa  New Unknown USBP ‐ El PaUnknown ( Yes Yes <Null> <Null>

Polyline PF SecondaOperationa  New Unknown USBP ‐ El PaUnknown ( Yes Yes <Null> <Null>

Polyline PF SecondaOperationa  New Unknown USBP ‐ El PaUnknown ( Yes Yes <Null> <Null>

Polyline PF SecondaOperationa  New Unknown USBP ‐ El PaUnknown ( Yes Yes <Null> <Null>

Polyline PF SecondaOperationa  New Unknown USBP ‐ El PaUnknown ( Yes Yes <Null> <Null>

Polyline PF SecondaOperationa  New Unknown USBP ‐ El PaUnknown ( Yes Yes <Null> <Null>

Polyline PF SecondaOperationa  New Unknown USBP ‐ El PaUnknown ( Yes Yes <Null> <Null>

Polyline PF SecondaOperationa  New Unknown USBP ‐ El PaUnknown ( Yes Yes <Null> <Null>

Polyline PF SecondaOperationa  New Unknown USBP ‐ El PaUnknown ( Yes Yes <Null> <Null>

Polyline PF SecondaOperationa  New Unknown USBP ‐ El PaUnknown ( Yes Yes <Null> <Null>

Polyline PF SecondaOperationa  New Unknown USBP ‐ El PaUnknown ( Yes Yes <Null> <Null>

Polyline PF SecondaOperationa  New Unknown USBP ‐ El PaUnknown ( Yes Yes <Null> <Null>

Polyline PF SecondaOperationa  New Unknown USBP ‐ El PaUnknown ( Yes Yes <Null> <Null>

Polyline PF SecondaOperationa  New Unknown USBP ‐ El PaUnknown ( Yes Yes <Null> <Null>

Polyline PF SecondaOperationa  New Unknown USBP ‐ El PaUnknown ( Yes Yes <Null> <Null>

Polyline PF SecondaOperationa  New Unknown USBP ‐ El PaUnknown ( Yes Yes <Null> <Null>

Polyline PF SecondaOperationa  New Unknown USBP ‐ El PaUnknown ( Yes Yes <Null> <Null>

Polyline PF SecondaOperationa  New Unknown USBP ‐ El PaUnknown ( Yes Yes <Null> <Null>

Polyline PF SecondaOperationa  New Unknown USBP ‐ El PaUnknown ( Yes Yes <Null> <Null>

Polyline PF SecondaOperationa  New Unknown USBP ‐ El PaUnknown ( Yes Yes <Null> <Null>

Polyline PF SecondaOperationa  New Unknown USBP ‐ El PaUnknown ( Yes Yes <Null> <Null>

Polyline PF SecondaOperationa  New Unknown USBP ‐ El PaUnknown ( Yes Yes <Null> <Null>

Polyline PF SecondaOperationa  New Unknown USBP ‐ El PaUnknown ( Yes Yes <Null> <Null>

Polyline PF SecondaOperationa  New Unknown USBP ‐ El PaUnknown ( Yes Yes <Null> <Null>

Polyline PF SecondaOperationa  New Unknown USBP ‐ El PaUnknown ( Yes Yes <Null> <Null>

Polyline PF SecondaOperationa  New Unknown USBP ‐ El PaUnknown ( Yes Yes <Null> <Null>

Polyline PF SecondaOperationa  New Unknown USBP ‐ El PaUnknown ( Yes Yes <Null> <Null>

Polyline PF SecondaOperationa  New Unknown USBP ‐ El PaUnknown ( Yes Yes <Null> <Null>

Polyline PF SecondaOperationa  New Unknown USBP ‐ El PaUnknown ( Yes Yes <Null> <Null>

Polyline PF SecondaOperationa  New Unknown USBP ‐ El PaUnknown ( Yes No <Null> <Null>

Polyline PF SecondaOperationa  New Unknown USBP ‐ El PaUnknown ( Yes No <Null> <Null>

Polyline PF SecondaOperationa  New Unknown USBP ‐ El PaUnknown ( Yes No <Null> <Null>

Polyline PF SecondaOperationa  New Unknown USBP ‐ El PaUnknown ( Yes No <Null> <Null>

Polyline PF SecondaOperationa  New Unknown USBP ‐ El PaUnknown ( Yes No <Null> <Null>

Polyline PF SecondaOperationa  New Unknown USBP ‐ El PaUnknown ( Yes Yes <Null> <Null>

Polyline PF SecondaOperationa  New Unknown USBP ‐ El PaUnknown ( Yes Yes <Null> <Null>

Polyline PF SecondaOperationa  New Unknown USBP ‐ El PaUnknown ( Yes Yes <Null> <Null>

Polyline PF SecondaOperationa  New Unknown USBP ‐ El PaUnknown ( Yes Yes <Null> <Null>

Polyline PF SecondaOperationa  New Unknown USBP ‐ El PaUnknown ( Yes Yes <Null> <Null>

Polyline PF SecondaOperationa  New Unknown USBP ‐ El PaUnknown ( Yes Yes <Null> <Null>

Polyline PF SecondaOperationa  New Unknown USBP ‐ El PaUnknown ( Yes Yes <Null> <Null>

Polyline PF SecondaOperationa  New Unknown USBP ‐ El PaUnknown ( Yes Yes <Null> <Null>

Polyline PF SecondaOperationa  New Unknown USBP ‐ El PaUnknown ( Yes Yes <Null> <Null>

Polyline PF SecondaOperationa  New Unknown USBP ‐ El PaUnknown ( Yes Yes <Null> <Null>

Polyline PF SecondaOperationa  New Unknown USBP ‐ El PaUnknown ( Yes Yes <Null> <Null>

Polyline PF SecondaOperationa  New Unknown USBP ‐ El PaUnknown ( Yes Yes <Null> <Null>

Polyline PF SecondaOperationa  New Unknown USBP ‐ El PaUnknown ( Yes Yes <Null> <Null>

Polyline PF SecondaOperationa  New Unknown USBP ‐ El PaUnknown ( Yes Yes <Null> <Null>

Polyline PF SecondaOperationa New SUnknown USBP ‐ El PaUnknown ( Yes Yes <Null> <Null>

Polyline PF SecondaOperationa New SUnknown USBP ‐ El PaUnknown ( Yes Yes <Null> <Null>

Polyline PF SecondaOperationa New SUnknown USBP ‐ El PaUnknown ( Yes Yes <Null> <Null>

Polyline PF SecondaOperationa New SUnknown USBP ‐ El PaUnknown ( Yes Yes <Null> <Null>

Polyline PF Primary Operationa New Pr Unknown USBP ‐ LareUnknown ( No No <Null> <Null>

Polyline PF Primary Operationa New Pr Unknown USBP ‐ LareUnknown ( No No <Null> <Null>

Polyline PF Primary Operationa New Pr Unknown USBP ‐ LareUnknown ( Yes No <Null> <Null>

Polyline PF Primary Operationa New Pr Unknown USBP ‐ LareUnknown ( No No <Null> <Null>

Polyline PF Primary Operationa New Pr Unknown USBP ‐ LareUnknown ( Yes No <Null> <Null>

Polyline PF Primary Operationa New Pr Unknown USBP ‐ LareUnknown ( No No <Null> <Null>

Polyline PF Primary Operationa New Pr Unknown USBP ‐ LareUnknown ( No No <Null> <Null>

Polyline PF Primary Operationa New Pr Unknown USBP ‐ LareUnknown ( No No <Null> <Null>

BW11 FOIA CBP 003166

(b) (7)(E)

(b) (7)(E)(b) (7)(E) (b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

EZAISA6
Sticky Note
None set by EZAISA6
EZAISA6
Sticky Note
MigrationNone set by EZAISA6
EZAISA6
Sticky Note
Unmarked set by EZAISA6
EZAISA6
Sticky Note
None set by EZAISA6
EZAISA6
Sticky Note
MigrationNone set by EZAISA6
EZAISA6
Sticky Note
Unmarked set by EZAISA6
EZAISA6
Sticky Note
None set by EZAISA6
EZAISA6
Sticky Note
MigrationNone set by EZAISA6
EZAISA6
Sticky Note
Unmarked set by EZAISA6
EZAISA6
Sticky Note
None set by EZAISA6
EZAISA6
Sticky Note
MigrationNone set by EZAISA6
EZAISA6
Sticky Note
Unmarked set by EZAISA6
Page 131: From: To: Cc: Subject: FW: TI Presidential Transition (FINAL … · 2019-04-15 · Subject: FW: TI Presidential Transition (FINAL 2).pptx FENCE & ROADS ALCON, Please find attached

Polyline PF Primary Operationa New Pr Unknown USBP ‐ LareUnknown ( No No <Null> <Null>

Polyline PF Primary Operationa New PrimUnknown USBP ‐ LareUnknown ( No No <Null> <Null>

Polyline PF Primary Operationa New PrimUnknown USBP ‐ LareUnknown ( No No <Null> <Null>

Polyline PF Primary Operationa New PrimUnknown USBP ‐ LareUnknown ( No No <Null> <Null>

Polyline PF Primary Operationa New PUnknown USBP ‐ LareUnknown ( Yes No <Null> <Null>

Polyline PF Primary Operationa  New PUnknown USBP ‐ LareUnknown ( No No <Null> <Null>

Polyline PF SecondaOperationa Revised pe Unknown USBP ‐ LareUnknown ( No No Cleared by <Null>

Polyline PF SecondaOperationa New SeUnknown USBP ‐ LareUnknown ( No No Cleared by <Null>

Polyline PF SecondaOperationa New SeUnknown USBP ‐ LareUnknown ( No No Cleared by <Null>

Polyline PF SecondaOperationa New SeUnknown USBP ‐ LareUnknown ( Yes No Cleared by <Null>

Polyline PF SecondaOperationa New SeUnknown USBP ‐ LareUnknown ( Yes Yes Cleared by <Null>

Polyline PF SecondaOperationa New SeUnknown USBP ‐ LareUnknown ( Yes No Cleared by <Null>

Polyline PF SecondaOperationa New SeUnknown USBP ‐ LareUnknown ( Yes No <Null> <Null>

Polyline PF SecondaOperationa New SeUnknown USBP ‐ LareUnknown ( No No <Null> <Null>

Polyline PF SecondaOperationa New SeUnknown USBP ‐ LareUnknown ( No No Cleared by <Null>

Polyline PF SecondaOperationa New SeUnknown USBP ‐ LareUnknown ( No No Cleared by <Null>

Polyline PF SecondaOperationa New SeUnknown USBP ‐ LareUnknown ( No No Cleared by <Null>

Polyline PF SecondaOperationa New SecoUnknown USBP ‐ LareUnknown ( No No Cleared by <Null>

Polyline PF SecondaOperationa New SecoUnknown USBP ‐ LareUnknown ( No No Cleared by <Null>

Polyline PF SecondaOperationa New SecoUnknown USBP ‐ LareUnknown ( No No Cleared by <Null>

Polyline PF SecondaOperationa New SUnknown USBP ‐ LareUnknown ( Yes No <Null> <Null>

Polyline PF SecondaOperationa New SUnknown USBP ‐ LareUnknown ( No No <Null> <Null>

Polyline PF Primary Operationa Not includeUnknown USBP ‐ Rio  Unknown ( Yes No <Null> <Null>

Polyline PF Primary Operationa Not includeUnknown USBP ‐ Rio  Unknown ( Yes No <Null> <Null>

Polyline PF Primary Operationa Not includeUnknown USBP ‐ Rio  Unknown ( Yes No <Null> <Null>

Polyline PF Primary Operationa Not includeUnknown USBP ‐ Rio  Unknown ( Yes No <Null> <Null>

Polyline PF Primary Operationa Not includeUnknown USBP ‐ Rio  Unknown ( No No <Null> <Null>

Polyline PF Primary Operationa Not includeUnknown USBP ‐ Rio  Unknown ( No No <Null> <Null>

Polyline PF Primary Operationa Not includeUnknown USBP ‐ Rio  Unknown ( Yes No <Null> <Null>

Polyline PF Primary Operationa Not includeUnknown USBP ‐ Rio  Unknown ( Yes No <Null> <Null>

Polyline PF Primary Operationa Not includeUnknown USBP ‐ Rio  Unknown ( Yes No <Null> <Null>

Polyline PF Primary Operationa Not includeUnknown USBP ‐ Rio  Unknown ( Yes No <Null> <Null>

Polyline PF Primary Operationa Not includeUnknown USBP ‐ Rio  Unknown ( No No <Null> <Null>

Polyline PF Primary Operationa Not includeUnknown USBP ‐ Rio  Unknown ( Yes No <Null> <Null>

Polyline PF Primary Operationa Not includeUnknown USBP ‐ Rio  Unknown ( No No <Null> <Null>

Polyline PF Primary Operationa Not includeUnknown USBP ‐ Rio  Unknown ( Yes No <Null> <Null>

Polyline PF Primary Operationa Not includeUnknown USBP ‐ Rio  Unknown ( No No <Null> <Null>

Polyline PF Primary Operationa Not includeUnknown USBP ‐ Rio  Unknown ( Yes No <Null> <Null>

Polyline PF Primary Operationa Replace witUnknown USBP ‐ Rio  Unknown ( Yes No <Null> <Null>

Polyline PF Primary Operationa Replace witUnknown USBP ‐ Rio  Unknown ( Yes No <Null> <Null>

Polyline PF Primary Operationa Replace witUnknown USBP ‐ Rio  Unknown ( No No <Null> <Null>

Polyline PF Primary Operationa Replace witUnknown USBP ‐ Rio  Unknown ( Yes No <Null> <Null>

Polyline PF Primary Operationa Replace witUnknown USBP ‐ Rio  Unknown ( No No <Null> <Null>

Polyline PF Primary Operationa Replace witUnknown USBP ‐ Rio  Unknown ( No No <Null> <Null>

Polyline PF Primary Operationa Replace witUnknown USBP ‐ Rio  Unknown ( Yes No <Null> <Null>

Polyline PF Primary Operationa Replace witUnknown USBP ‐ Rio  Unknown ( Yes No <Null> <Null>

Polyline PF Primary Operationa Replace witUnknown USBP ‐ Rio  Unknown ( No No <Null> <Null>

Polyline PF Primary Operationa Not includeUnknown USBP ‐ Rio  Unknown ( Yes No <Null> <Null>

Polyline PF Primary Operationa Not includeUnknown USBP ‐ Rio  Unknown ( Yes No <Null> <Null>

Polyline PF Primary Operationa Not includeUnknown USBP ‐ Rio  Unknown ( Yes No <Null> <Null>

Polyline PF Primary Operationa Not includeUnknown USBP ‐ Rio  Unknown ( No No <Null> <Null>

Polyline PF Primary Operationa Not includeUnknown USBP ‐ Rio  Unknown ( No No <Null> <Null>

Polyline PF Primary Operationa Not includeUnknown USBP ‐ Rio  Unknown ( Yes No <Null> <Null>

Polyline PF Primary Operationa <Null> Unknown USBP ‐ Rio  Unknown ( No No <Null> <Null>

Polyline PF Primary Operationa <Null> Unknown USBP ‐ Rio  Unknown ( Yes No <Null> <Null>

Polyline PF Primary Operationa <Null> Unknown USBP ‐ Rio  Unknown ( No No <Null> <Null>

Polyline PF Primary Operationa <Null> Unknown USBP ‐ Rio  Unknown ( Yes No <Null> <Null>

Polyline PF Primary Operationa <Null> Unknown USBP ‐ Rio  Unknown ( Yes No <Null> <Null>

Polyline PF Primary Operationa <Null> Unknown USBP ‐ Rio  Unknown ( Yes No <Null> <Null>

Polyline PF Primary Operationa <Null> Unknown USBP ‐ Rio  Unknown ( Yes No <Null> <Null>

Polyline PF Primary Operationa <Null> Unknown USBP ‐ Rio  Unknown ( No No <Null> <Null>

Polyline PF Primary Operationa <Null> Unknown USBP ‐ Rio  Unknown ( Yes No <Null> <Null>

Polyline PF Primary Operationa <Null> Unknown USBP ‐ Rio  Unknown ( Yes No <Null> <Null>

Polyline PF Primary Operationa <Null> Unknown USBP ‐ Rio  Unknown ( No No <Null> <Null>

Polyline PF Primary Operationa <Null> Unknown USBP ‐ Rio  Unknown ( Yes No <Null> <Null>

Polyline PF Primary Operationa <Null> Unknown USBP ‐ Rio  Unknown ( No No <Null> <Null>

Polyline PF Primary Operationa <Null> Unknown USBP ‐ Rio  Unknown ( Yes No <Null> <Null>

Polyline Unconst. PFOperationa Revised pe Unknown USBP ‐ TucsUnknown ( Yes No <Null> <Null>

Polyline PF Primary Operationa Revised pe Unknown USBP ‐ TucsUnknown ( No No <Null> <Null>

Polyline PF Primary Operationa Revised pe Unknown USBP ‐ TucsUnknown ( Yes No <Null> <Null>

Polyline PF Primary Operationa Revised pe Unknown USBP ‐ TucsUnknown ( No No <Null> <Null>

BW11 FOIA CBP 003167

(b) (7)(E)

(b) (7)(E)(b) (7)(E) (b) (7)(E)(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

EZAISA6
Sticky Note
None set by EZAISA6
EZAISA6
Sticky Note
MigrationNone set by EZAISA6
EZAISA6
Sticky Note
Unmarked set by EZAISA6
EZAISA6
Sticky Note
None set by EZAISA6
EZAISA6
Sticky Note
MigrationNone set by EZAISA6
EZAISA6
Sticky Note
Unmarked set by EZAISA6
EZAISA6
Sticky Note
None set by EZAISA6
EZAISA6
Sticky Note
MigrationNone set by EZAISA6
EZAISA6
Sticky Note
Unmarked set by EZAISA6
EZAISA6
Sticky Note
None set by EZAISA6
EZAISA6
Sticky Note
MigrationNone set by EZAISA6
EZAISA6
Sticky Note
Unmarked set by EZAISA6
Page 132: From: To: Cc: Subject: FW: TI Presidential Transition (FINAL … · 2019-04-15 · Subject: FW: TI Presidential Transition (FINAL 2).pptx FENCE & ROADS ALCON, Please find attached

Polyline PF Primary Operationa Revised pe Unknown USBP ‐ TucsUnknown ( Yes No <Null> <Null>

Polyline PF Primary Operationa Revised pe Unknown USBP ‐ TucsUnknown ( No No <Null> <Null>

Polyline PF Replace Replaceme ReplaceUnknown USBP ‐ TucsUnknown ( Yes Yes <Null> Yes

Polyline PF Replace Replaceme eplacemUnknown USBP ‐ TucsUnknown ( Yes Yes <Null> No

Polyline VF to PF VF to PF Revised pe Unknown USBP ‐ TucsUnknown ( Yes Yes <Null> Yes

Polyline VF to PF VF to PF Revised pe Unknown USBP ‐ TucsUnknown ( Yes Yes <Null> Yes

Polyline Unconst. PFOperationa Revised pe Unknown USBP ‐ TucsUnknown ( Yes No <Null> <Null>

Polyline Unconst. PFOperationa Revised pe Unknown USBP ‐ TucsUnknown ( No No <Null> <Null>

Polyline Unconst. PFOperationa Revised pe Unknown USBP ‐ TucsUnknown ( Yes No <Null> <Null>

Polyline Unconst. PFOperationa Revised pe Unknown USBP ‐ TucsUnknown ( No No <Null> <Null>

Polyline VF to PF VF to PF Revised pe Unknown USBP ‐ TucsUnknown ( Yes Yes <Null> Yes

Polyline VF to PF VF to PF Revised pe Unknown USBP ‐ TucsUnknown ( Yes Yes <Null> Yes

Polyline VF to PF VF to PF Revised pe Unknown USBP ‐ TucsUnknown ( Yes Yes <Null> Yes

Polyline VF to PF VF to PF Revised pe Unknown USBP ‐ TucsUnknown ( Yes Yes <Null> Yes

Polyline VF to PF VF to PF Revised pe Unknown USBP ‐ TucsUnknown ( Yes Yes <Null> Yes

Polyline VF to PF VF to PF Revised pe Unknown USBP ‐ TucsUnknown ( Yes Yes <Null> Yes

Polyline VF to PF VF to PF Revised pe Unknown USBP ‐ TucsUnknown ( Yes Yes <Null> Yes

Polyline VF to PF VF to PF Revised pe Unknown USBP ‐ TucsUnknown ( Yes Yes <Null> Yes

Polyline VF to PF VF to PF Revised pe Unknown USBP ‐ TucsUnknown ( Yes Yes <Null> Yes

Polyline PF Replace Replaceme eplacemUnknown USBP ‐ TucsUnknown ( Yes Yes <Null> No

Polyline PF Replace Replaceme eplacemUnknown USBP ‐ TucsUnknown ( Yes Yes <Null> No

Polyline PF Replace Replaceme eplacemUnknown USBP ‐ TucsUnknown ( Yes Yes <Null> No

Polyline PF Replace Replaceme eplacemUnknown USBP ‐ TucsUnknown ( Yes Yes <Null> No

Polyline PF Replace Replaceme eplacemUnknown USBP ‐ YumUnknown ( Yes Yes <Null> Yes

Polyline PF Replace Replaceme eplacemUnknown USBP ‐ YumUnknown ( Yes Yes <Null> Yes

Polyline PF Replace Replaceme eplacemUnknown USBP ‐ YumUnknown ( Yes Yes <Null> Yes

Polyline PF Replace Replaceme  ReplaceUnknown USBP ‐ YumUnknown ( Yes Yes <Null> No

Polyline PF Replace Replaceme ReplaceUnknown USBP ‐ YumUnknown ( Yes Yes <Null> No

Polyline PF Replace Replaceme ReplaceUnknown USBP ‐ YumUnknown ( Yes Yes <Null> No

Polyline PF Replace Replaceme ReplaceUnknown USBP ‐ YumUnknown ( Yes Yes <Null> No

Polyline PF Replace Replaceme ReplacemUnknown USBP ‐ YumUnknown ( Yes Yes <Null> Yes

Polyline PF Replace Replaceme ReplacemUnknown USBP ‐ YumUnknown ( Yes Yes <Null> Yes

Polyline PF Replace Replaceme ReplacemUnknown USBP ‐ YumUnknown ( Yes Yes <Null> Yes

Polyline PF Replace Replaceme ReplacemUnknown USBP ‐ YumUnknown ( Yes Yes <Null> Yes

Polyline PF Replace Replaceme ReplacemUnknown USBP ‐ YumUnknown ( Yes Yes <Null> Yes

Polyline PF Replace Replaceme remUnknown USBP ‐ YumUnknown ( Yes Yes <Null> No

Polyline PF Replace Replaceme remUnknown USBP ‐ YumUnknown ( Yes Yes <Null> No

Polyline PF Replace Replaceme remUnknown USBP ‐ YumUnknown ( Yes Yes <Null> No

Polyline PF SecondaOperationa Length revi Unknown USBP ‐ TucsUnknown ( Yes Yes <Null> <Null>

Polyline PF SecondaOperationa Length revi Unknown USBP ‐ TucsUnknown ( Yes Yes <Null> <Null>

Polyline PF SecondaOperationa Length revi Unknown USBP ‐ TucsUnknown ( Yes Yes <Null> <Null>

Polyline PF SecondaOperationa Length revi Unknown USBP ‐ TucsUnknown ( Yes Yes <Null> <Null>

Polyline PF Primary Operationa New PUnknown USBP ‐ Blai Unknown ( No No <Null> <Null>

Polyline PF Primary Operationa New PUnknown USBP ‐ Blai Unknown ( No No <Null> <Null>

Polyline PF Primary Operationa New Pr Unknown USBP ‐ Blai Unknown ( No No <Null> <Null>

Polyline VF Primary Operationa New VUnknown USBP ‐ HouUnknown ( No No <Null> <Null>

Polyline VF Primary Operationa New VUnknown USBP ‐ HouUnknown ( No No <Null> <Null>

Polyline VF Primary Operationa New VUnknown USBP ‐ HouUnknown ( No No <Null> <Null>

Polyline VF Primary Operationa New VUnknown USBP ‐ HouUnknown ( No No <Null> <Null>

Polyline VF Primary Operationa New VUnknown USBP ‐ HouUnknown ( No No <Null> <Null>

Polyline VF Primary Operationa New VUnknown USBP ‐ HouUnknown ( No No <Null> <Null>

Polyline VF Primary Operationa New VUnknown USBP ‐ HouUnknown ( No No <Null> <Null>

Polyline VF Primary Operationa New VUnknown USBP ‐ HouUnknown ( No No <Null> <Null>

Polyline VF Primary Operationa New VUnknown USBP ‐ HouUnknown ( No No <Null> <Null>

Polyline VF Primary Operationa New VUnknown USBP ‐ HouUnknown ( No No <Null> <Null>

Polyline VF Primary Operationa New VUnknown USBP ‐ HouUnknown ( No No <Null> <Null>

Polyline VF Primary Operationa New VUnknown USBP ‐ HouUnknown ( No No <Null> <Null>

Polyline VF Primary Operationa New VUnknown USBP ‐ HouUnknown ( No No <Null> <Null>

Polyline VF Primary Operationa New VUnknown USBP ‐ HouUnknown ( No No <Null> <Null>

Polyline VF Primary Operationa New VeUnknown USBP ‐ HouUnknown ( No No <Null> <Null>

Polyline VF Primary Operationa  New VUnknown USBP ‐ HouUnknown ( No No <Null> <Null>

Polyline VF Primary Operationa  New VUnknown USBP ‐ HouUnknown ( No No <Null> <Null>

Polyline VF Primary Operationa  New VUnknown USBP ‐ HouUnknown ( No No <Null> <Null>

Polyline VF Primary Operationa  New VUnknown USBP ‐ HouUnknown ( No No <Null> <Null>

Polyline VF Primary Operationa  New VUnknown USBP ‐ HouUnknown ( No No <Null> <Null>

Polyline VF Primary Operationa  New VUnknown USBP ‐ HouUnknown ( No No <Null> <Null>

Polyline VF Primary Operationa  New VUnknown USBP ‐ HouUnknown ( No No <Null> <Null>

Polyline VF Primary Operationa  New VUnknown USBP ‐ HouUnknown ( No No <Null> <Null>

Polyline VF Primary Operationa  New VUnknown USBP ‐ HouUnknown ( No No <Null> <Null>

Polyline VF Primary Operationa  New VUnknown USBP ‐ HouUnknown ( No No <Null> <Null>

Polyline VF Primary Operationa  New VUnknown USBP ‐ HouUnknown ( No No <Null> <Null>

BW11 FOIA CBP 003168

(b) (7)(E)

(b) (7)(E)(b) (7)(E) (b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

EZAISA6
Sticky Note
None set by EZAISA6
EZAISA6
Sticky Note
MigrationNone set by EZAISA6
EZAISA6
Sticky Note
Unmarked set by EZAISA6
EZAISA6
Sticky Note
None set by EZAISA6
EZAISA6
Sticky Note
MigrationNone set by EZAISA6
EZAISA6
Sticky Note
Unmarked set by EZAISA6
EZAISA6
Sticky Note
None set by EZAISA6
EZAISA6
Sticky Note
MigrationNone set by EZAISA6
EZAISA6
Sticky Note
Unmarked set by EZAISA6
EZAISA6
Sticky Note
None set by EZAISA6
EZAISA6
Sticky Note
MigrationNone set by EZAISA6
EZAISA6
Sticky Note
Unmarked set by EZAISA6
Page 133: From: To: Cc: Subject: FW: TI Presidential Transition (FINAL … · 2019-04-15 · Subject: FW: TI Presidential Transition (FINAL 2).pptx FENCE & ROADS ALCON, Please find attached

Polyline VF Primary Operationa New VUnknown USBP ‐ HouUnknown ( No No <Null> <Null>

Polyline VF Primary Operationa New VUnknown USBP ‐ HouUnknown ( No No <Null> <Null>

Polyline VF Primary Operationa New VUnknown USBP ‐ HouUnknown ( No No <Null> <Null>

Polyline VF Primary Operationa New VUnknown USBP ‐ HouUnknown ( No No <Null> <Null>

Polyline VF Primary Operationa New VUnknown USBP ‐ HouUnknown ( No No <Null> <Null>

Polyline VF Primary Operationa New VUnknown USBP ‐ HouUnknown ( No No <Null> <Null>

Polyline VF Primary Operationa New VUnknown USBP ‐ HouUnknown ( No No <Null> <Null>

Polyline PF Primary Operationa New PrimUnknown USBP ‐ Hav Unknown ( No No <Null> <Null>

Polyline PF Primary Operationa New Pr Unknown USBP ‐ Hav Unknown ( No No <Null> <Null>

Polyline VF Primary Operationa New VeUnknown USBP ‐ Hav Unknown ( No No <Null> <Null>

Polyline PF Primary Operationa New Pr Unknown USBP ‐ Hav Unknown ( No No <Null> <Null>

Polyline VF Primary Operationa New Veh Unknown USBP ‐ Hav Unknown ( No No <Null> <Null>

Polyline PF Primary Operationa ew Pr Unknown USBP ‐ Hav Unknown ( No No <Null> <Null>

Polyline VF Primary Operationa New Veh Unknown USBP ‐ Hav Unknown ( No No <Null> <Null>

Polyline PF Primary Operationa New Pr Unknown USBP ‐ Hav Unknown ( No No <Null> <Null>

Polyline VF Primary Operationa New Veh Unknown USBP ‐ Hav Unknown ( No No <Null> <Null>

Polyline PF Primary Operationa New Pr Unknown USBP ‐ Hav Unknown ( No No <Null> <Null>

Polyline VF Primary Operationa New Veh Unknown USBP ‐ Hav Unknown ( No No <Null> <Null>

Polyline PF Primary Operationa New Pr Unknown USBP ‐ Hav Unknown ( No No <Null> <Null>

Polyline VF Primary Operationa  New Ve Unknown USBP ‐ Hav Unknown ( No No <Null> <Null>

Polyline PF Primary Operationa New Pr Unknown USBP ‐ Hav Unknown ( No No <Null> <Null>

Polyline VF Primary Operationa New Veh Unknown USBP ‐ Hav Unknown ( No No <Null> <Null>

Polyline PF Primary Operationa New Pr Unknown USBP ‐ Hav Unknown ( No No <Null> <Null>

Polyline VF Primary Operationa  New Ve Unknown USBP ‐ Hav Unknown ( No No <Null> <Null>

Polyline PF Primary Operationa New Pr Unknown USBP ‐ Hav Unknown ( No No <Null> <Null>

Polyline PF Primary Operationa New Pr Unknown USBP ‐ Hav Unknown ( No No <Null> <Null>

Polyline VF Primary Operationa  New VUnknown USBP ‐ Hav Unknown ( No No <Null> <Null>

Polyline PF Primary Operationa New Pr Unknown USBP ‐ Hav Unknown ( No No <Null> <Null>

Polyline VF Primary Operationa  New Ve Unknown USBP ‐ Hav Unknown ( No No <Null> <Null>

Polyline PF Primary Operationa New Pr Unknown USBP ‐ Hav Unknown ( No No <Null> <Null>

Polyline PF Primary Operationa New Pr Unknown USBP ‐ Hav Unknown ( No No <Null> <Null>

Polyline PF Primary Operationa New Pr Unknown USBP ‐ Hav Unknown ( No No <Null> <Null>

Polyline VF Primary Operationa New Veh Unknown USBP ‐ Hav Unknown ( No No <Null> <Null>

Polyline PF Primary Operationa New Pr Unknown USBP ‐ Hav Unknown ( No No <Null> <Null>

Polyline VF Primary Operationa New Veh Unknown USBP ‐ Hav Unknown ( No No <Null> <Null>

Polyline PF Primary Operationa New Pr Unknown USBP ‐ Hav Unknown ( No No <Null> <Null>

Polyline VF Primary Operationa New Veh Unknown USBP ‐ Hav Unknown ( No No <Null> <Null>

Polyline PF Primary Operationa New Pr Unknown USBP ‐ Hav Unknown ( No No <Null> <Null>

Polyline VF Primary Operationa New Veh Unknown USBP ‐ Hav Unknown ( No No <Null> <Null>

Polyline PF Primary Operationa New Pr Unknown USBP ‐ Hav Unknown ( No No <Null> <Null>

Polyline VF Primary Operationa New Ve Unknown USBP ‐ Hav Unknown ( No No <Null> <Null>

Polyline PF Primary Operationa New Pr Unknown USBP ‐ Hav Unknown ( No No <Null> <Null>

Polyline VF Primary Operationa New Veh Unknown USBP ‐ Hav Unknown ( No No <Null> <Null>

Polyline PF Primary Operationa New Pr Unknown USBP ‐ Hav Unknown ( No No <Null> <Null>

Polyline VF Primary Operationa New Veh Unknown USBP ‐ Hav Unknown ( No No <Null> <Null>

Polyline PF Primary Operationa New Pr Unknown USBP ‐ Hav Unknown ( No No <Null> <Null>

Polyline VF Primary Operationa New Veh Unknown USBP ‐ Hav Unknown ( No No <Null> <Null>

Polyline PF Primary Operationa New Pr Unknown USBP ‐ Hav Unknown ( No No <Null> <Null>

Polyline VF Primary Operationa New Veh Unknown USBP ‐ Hav Unknown ( No No <Null> <Null>

Polyline PF Primary Operationa New Pr Unknown USBP ‐ Hav Unknown ( No No <Null> <Null>

Polyline VF Primary Operationa New Veh Unknown USBP ‐ Hav Unknown ( No No <Null> <Null>

Polyline PF Primary Operationa New Pr Unknown USBP ‐ Spo Unknown ( No No <Null> <Null>

Polyline PF Primary Operationa New Pr Unknown USBP ‐ Spo Unknown ( No No <Null> <Null>

Polyline PF SecondaOperationa New SeUnknown USBP ‐ Spo Unknown ( No No Cleared by <Null>

Polyline PF Primary Operationa New PrimUnknown USBP ‐ Spo Unknown ( No No <Null> <Null>

Polyline PF SecondaOperationa New SecoUnknown USBP ‐ Spo Unknown ( No No Cleared by <Null>

Polyline PF Primary Operationa New Pr Unknown USBP ‐ Spo Unknown ( No No <Null> <Null>

Polyline PF Primary Operationa New Pr Unknown USBP ‐ Spo Unknown ( No No <Null> <Null>

Polyline PF Primary Operationa  New PUnknown USBP ‐ Spo Unknown ( No No <Null> <Null>

Polyline PF Primary Operationa New Pr Unknown USBP ‐ Spo Unknown ( No No <Null> <Null>

Polyline PF Primary Operationa  New PrimUnknown USBP ‐ Spo Unknown ( No No <Null> <Null>

Polyline PF Primary Operationa  New PrimUnknown USBP ‐ Spo Unknown ( No No <Null> <Null>

Polyline PF Primary Operationa  New PrimUnknown USBP ‐ Spo Unknown ( No No <Null> <Null>

Polyline PF Primary Operationa New PUnknown USBP ‐ Spo Unknown ( No No <Null> <Null>

Polyline PF Primary Operationa ew Pr Unknown USBP ‐ Spo Unknown ( No No <Null> <Null>

Polyline PF Primary Operationa New PUnknown USBP ‐ Spo Unknown ( No No <Null> <Null>

Polyline PF Primary Operationa New PUnknown USBP ‐ Spo Unknown ( No No <Null> <Null>

Polyline PF Primary Operationa New PUnknown USBP ‐ Spo Unknown ( No No <Null> <Null>

Polyline VF Primary Operationa New VUnknown USBP ‐ Spo Unknown ( No No <Null> <Null>

Polyline VF Primary Operationa New VUnknown USBP ‐ Spo Unknown ( No No <Null> <Null>

Polyline PF Primary Operationa New PrimUnknown USBP ‐ Spo Unknown ( No No <Null> <Null>

BW11 FOIA CBP 003169

(b) (7)(E)

(b) (7)(E)(b) (7)(E) (b) (7)(E)(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

EZAISA6
Sticky Note
None set by EZAISA6
EZAISA6
Sticky Note
MigrationNone set by EZAISA6
EZAISA6
Sticky Note
Unmarked set by EZAISA6
EZAISA6
Sticky Note
None set by EZAISA6
EZAISA6
Sticky Note
MigrationNone set by EZAISA6
EZAISA6
Sticky Note
Unmarked set by EZAISA6
EZAISA6
Sticky Note
None set by EZAISA6
EZAISA6
Sticky Note
MigrationNone set by EZAISA6
EZAISA6
Sticky Note
Unmarked set by EZAISA6
EZAISA6
Sticky Note
None set by EZAISA6
EZAISA6
Sticky Note
MigrationNone set by EZAISA6
EZAISA6
Sticky Note
Unmarked set by EZAISA6
Page 134: From: To: Cc: Subject: FW: TI Presidential Transition (FINAL … · 2019-04-15 · Subject: FW: TI Presidential Transition (FINAL 2).pptx FENCE & ROADS ALCON, Please find attached

Polyline PF Primary Operationa  New Pri Unknown USBP ‐ Spo Unknown ( No No <Null> <Null>

Polyline PF Primary Operationa New PrimUnknown USBP ‐ Spo Unknown ( No No <Null> <Null>

Polyline PF Primary Operationa New Pr Unknown USBP ‐ Spo Unknown ( No No <Null> <Null>

Polyline PF Primary Operationa  New PUnknown USBP ‐ Spo Unknown ( No No <Null> <Null>

Polyline VF Primary Operationa New VeUnknown USBP ‐ Spo Unknown ( No No <Null> <Null>

Polyline PF Primary Operationa New Pr Unknown USBP ‐ Spo Unknown ( No No <Null> <Null>

Polyline PF Primary Operationa New PrimUnknown USBP ‐ Spo Unknown ( No No <Null> <Null>

Polyline VF Primary Operationa New Veh Unknown USBP ‐ Spo Unknown ( No No <Null> <Null>

Polyline VF Primary Operationa New Veh Unknown USBP ‐ Spo Unknown ( No No <Null> <Null>

Polyline PF Primary Operationa  New PUnknown USBP ‐ Spo Unknown ( No No <Null> <Null>

Polyline PF Primary Operationa  New Unknown USBP ‐ Spo Unknown ( No No <Null> <Null>

Polyline PF Primary Operationa  New PUnknown USBP ‐ Spo Unknown ( No No <Null> <Null>

Polyline PF Primary Operationa New PrimUnknown USBP ‐ Spo Unknown ( No No <Null> <Null>

Polyline PF Primary Operationa New Pr Unknown USBP ‐ Spo Unknown ( No No <Null> <Null>

Polyline VF Primary Operationa New VUnknown USBP ‐ HouUnknown ( No No <Null> <Null>

Polyline VF to PF VF to PF Revised pe Unknown USBP ‐ TucsUnknown ( Yes Yes <Null> Yes

Polyline VF to PF VF to PF Revised pe Unknown USBP ‐ TucsUnknown ( Yes Yes <Null> Yes

Polyline VF to PF VF to PF Revised pe Unknown USBP ‐ TucsUnknown ( Yes Yes <Null> Yes

Polyline VF to PF VF to PF Revised pe Unknown USBP ‐ TucsUnknown ( Yes Yes <Null> Yes

Polyline VF to PF VF to PF Revised pe Unknown USBP ‐ TucsUnknown ( Yes Yes <Null> Yes

Polyline PF Primary Operationa Revised pe Unknown USBP ‐ El PaUnknown ( Yes No <Null> <Null>

Polyline PF Primary Operationa Revised pe Unknown USBP ‐ El PaUnknown ( Yes No <Null> <Null>

Polyline PF Primary Operationa Revised pe Unknown USBP ‐ El PaUnknown ( No No <Null> <Null>

Polyline VF to PF VF to PF Revised pe Unknown USBP ‐ El PaUnknown ( Yes Yes <Null> Yes

Polyline VF to PF VF to PF Revised pe Unknown USBP ‐ El PaUnknown ( Yes Yes <Null> Yes

Polyline VF to PF VF to PF Revised pe Unknown USBP ‐ El PaUnknown ( Yes Yes <Null> Yes

Polyline PF Primary Operationa Revised pe Unknown USBP ‐ El PaUnknown ( Yes No <Null> <Null>

Polyline VF to PF VF to PF Revised pe Unknown USBP ‐ El PaUnknown ( Yes Yes <Null> Yes

Polyline VF to PF VF to PF Revised pe Unknown USBP ‐ El PaUnknown ( Yes Yes <Null> Yes

Polyline VF to PF VF to PF Revised pe Unknown USBP ‐ El PaUnknown ( Yes Yes <Null> Yes

Polyline VF to PF VF to PF Revised pe Unknown USBP ‐ El PaUnknown ( Yes Yes <Null> Yes

Polyline VF to PF VF to PF Revised pe Unknown USBP ‐ El PaUnknown ( Yes Yes <Null> Yes

Polyline Unconst. PFOperationa Revised pe Unknown USBP ‐ TucsUnknown ( Yes No <Null> <Null>

Polyline VF to PF VF to PF Revised pe Unknown USBP ‐ TucsUnknown ( Yes Yes <Null> Yes

Polyline VF to PF VF to PF Revised pe Unknown USBP ‐ TucsUnknown ( Yes Yes <Null> Yes

Polyline Unconst. PFOperationa Revised pe Unknown USBP ‐ TucsUnknown ( No No <Null> <Null>

Polyline VF to PF VF to PF Revised pe Unknown USBP ‐ TucsUnknown ( Yes Yes <Null> Yes

Polyline VF to PF VF to PF Revised pe Unknown USBP ‐ TucsUnknown ( Yes Yes <Null> Yes

Polyline Unconst. PFOperationa Revised pe Unknown USBP ‐ TucsUnknown ( No No <Null> <Null>

Polyline VF to PF VF to PF Revised pe Unknown USBP ‐ TucsUnknown ( Yes Yes <Null> Yes

Polyline Unconst. PFOperationa Revised pe Unknown USBP ‐ TucsUnknown ( Yes No <Null> <Null>

Polyline Unconst. PFOperationa Revised pe Unknown USBP ‐ TucsUnknown ( Yes No <Null> <Null>

Polyline VF to PF VF to PF Revised pe Unknown USBP ‐ El PaUnknown ( Yes Yes <Null> Yes

Polyline VF to PF VF to PF Revised pe Unknown USBP ‐ El PaUnknown ( Yes Yes <Null> Yes

Polyline VF to PF VF to PF Revised pe Unknown USBP ‐ El PaUnknown ( Yes Yes <Null> Yes

Polyline VF to PF VF to PF Revised pe Unknown USBP ‐ El PaUnknown ( Yes Yes <Null> Yes

Polyline VF to PF VF to PF Revised pe Unknown USBP ‐ El PaUnknown ( Yes Yes <Null> Yes

Polyline PF Primary Operationa Revised pe Unknown USBP ‐ El PaUnknown ( Yes No <Null> <Null>

Polyline PF Primary Operationa Revised pe Unknown USBP ‐ El PaUnknown ( Yes No <Null> <Null>

Polyline PF Primary Operationa Revised pe Unknown USBP ‐ El PaUnknown ( No No <Null> <Null>

Polyline PF Primary Operationa Revised pe Unknown USBP ‐ El PaUnknown ( Yes No <Null> <Null>

Polyline PF Primary Operationa Revised pe Unknown USBP ‐ El PaUnknown ( No No <Null> <Null>

Polyline VF to PF VF to PF Revised pe Unknown USBP ‐ El PaUnknown ( Yes Yes <Null> Yes

Polyline VF to PF VF to PF Revised pe Unknown USBP ‐ El PaUnknown ( Yes Yes <Null> Yes

Polyline VF to PF VF to PF Revised pe Unknown USBP ‐ El PaUnknown ( Yes Yes <Null> Yes

Polyline VF to PF VF to PF Revised pe Unknown USBP ‐ El PaUnknown ( Yes Yes <Null> Yes

Polyline VF to PF VF to PF Revised pe Unknown USBP ‐ El PaUnknown ( Yes Yes <Null> Yes

Polyline PF Primary Operationa Revised pe Unknown USBP ‐ El PaUnknown ( Yes No <Null> <Null>

Polyline PF Primary Operationa Revised pe Unknown USBP ‐ El PaUnknown ( Yes No <Null> <Null>

Polyline PF Primary Operationa Revised pe Unknown USBP ‐ El PaUnknown ( No No <Null> <Null>

Polyline VF to PF VF to PF Revised pe Unknown USBP ‐ El PaUnknown ( Yes Yes <Null> Yes

Polyline VF to PF VF to PF Revised pe Unknown USBP ‐ El PaUnknown ( Yes Yes <Null> Yes

Polyline VF to PF VF to PF Revised pe Unknown USBP ‐ El PaUnknown ( Yes Yes <Null> Yes

Polyline VF to PF VF to PF Revised pe Unknown USBP ‐ El PaUnknown ( Yes Yes <Null> Yes

Polyline VF to PF VF to PF Revised pe Unknown USBP ‐ El PaUnknown ( Yes Yes <Null> Yes

Polyline PF Replace Replaceme Revised pe Unknown USBP ‐ El PaUnknown ( Yes Yes <Null> Yes

Polyline PF Replace Replaceme Revised pe Unknown USBP ‐ El PaUnknown ( Yes Yes <Null> Yes

Polyline PF Replace Replaceme Revised pe Unknown USBP ‐ El PaUnknown ( Yes Yes <Null> Yes

Polyline PF Primary Operationa Revised pe Unknown USBP ‐ LareUnknown ( No No <Null> <Null>

Polyline VF Primary Operationa ew VeUnknown USBP ‐ Spo Unknown ( No No <Null> <Null>

Polyline VF Primary Operationa ew VeUnknown USBP ‐ Spo Unknown ( No No <Null> <Null>

BW11 FOIA CBP 003170

(b) (7)(E)

(b) (7)(E)(b) (7)(E) (b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

EZAISA6
Sticky Note
None set by EZAISA6
EZAISA6
Sticky Note
MigrationNone set by EZAISA6
EZAISA6
Sticky Note
Unmarked set by EZAISA6
EZAISA6
Sticky Note
None set by EZAISA6
EZAISA6
Sticky Note
MigrationNone set by EZAISA6
EZAISA6
Sticky Note
Unmarked set by EZAISA6
EZAISA6
Sticky Note
None set by EZAISA6
EZAISA6
Sticky Note
MigrationNone set by EZAISA6
EZAISA6
Sticky Note
Unmarked set by EZAISA6
EZAISA6
Sticky Note
None set by EZAISA6
EZAISA6
Sticky Note
MigrationNone set by EZAISA6
EZAISA6
Sticky Note
Unmarked set by EZAISA6
Page 135: From: To: Cc: Subject: FW: TI Presidential Transition (FINAL … · 2019-04-15 · Subject: FW: TI Presidential Transition (FINAL 2).pptx FENCE & ROADS ALCON, Please find attached

Polyline VF Primary Operationa ew VeUnknown USBP ‐ Spo Unknown ( No No <Null> <Null>

Polyline VF Primary Operationa ew VeUnknown USBP ‐ Spo Unknown ( No No <Null> <Null>

Polyline VF Primary Operationa ew VeUnknown USBP ‐ Spo Unknown ( No No <Null> <Null>

Polyline VF Primary Operationa New VUnknown USBP ‐ HouUnknown ( No No <Null> <Null>

Polyline PF Primary Operationa Revised pe Unknown USBP ‐ TucsUnknown ( Yes No <Null> <Null>

Polyline VF to PF VF to PF Revised pe Unknown USBP ‐ TucsUnknown ( Yes Yes <Null> Yes

Polyline PF Replace Replaceme Revised pe Unknown USBP ‐ San Unknown ( Yes Yes <Null> No

Polyline PF Replace Replaceme Revised pe Unknown USBP ‐ San Unknown ( Yes Yes <Null> No

Polyline PF Replace Replaceme Revised pe Unknown USBP ‐ San Unknown ( Yes Yes <Null> No

Polyline PF Replace Replaceme Revised pe Unknown USBP ‐ San Unknown ( Yes Yes <Null> No

Polyline PF Replace Replaceme Revised pe Unknown USBP ‐ San Unknown ( Yes Yes <Null> No

Polyline PF Replace Replaceme Revised pe Unknown USBP ‐ San Unknown ( Yes Yes <Null> No

Polyline PF Replace Replaceme Revised pe Unknown USBP ‐ San Unknown ( Yes Yes <Null> No

Polyline PF Replace Replaceme Revised pe Unknown USBP ‐ San Unknown ( Yes Yes <Null> No

Polyline PF Replace Replaceme Revised pe Unknown USBP ‐ San Unknown ( Yes Yes <Null> No

Polyline PF Replace Replaceme Revised pe Unknown USBP ‐ San Unknown ( Yes Yes <Null> No

Polyline PF Replace Replaceme Revised pe Unknown USBP ‐ San Unknown ( Yes Yes <Null> No

Polyline PF Replace Replaceme Revised pe Unknown USBP ‐ San Unknown ( Yes Yes <Null> No

Polyline PF Replace Replaceme Revised pe Unknown USBP ‐ San Unknown ( Yes Yes <Null> No

Polyline PF Replace Replaceme Revised pe Unknown USBP ‐ San Unknown ( Yes Yes <Null> No

Polyline PF Replace Replaceme Revised pe Unknown USBP ‐ San Unknown ( Yes Yes <Null> No

Polyline PF Replace Replaceme Revised pe Unknown USBP ‐ San Unknown ( Yes Yes <Null> No

Polyline PF Replace Replaceme Revised pe Unknown USBP ‐ San Unknown ( Yes Yes <Null> No

Polyline PF Replace Replaceme Revised pe Unknown USBP ‐ San Unknown ( Yes Yes <Null> No

Polyline PF Replace Replaceme Revised pe Unknown USBP ‐ San Unknown ( Yes Yes <Null> No

Polyline PF Replace Replaceme Revised pe Unknown USBP ‐ San Unknown ( Yes Yes <Null> No

Polyline PF Replace Replaceme Revised pe Unknown USBP ‐ San Unknown ( Yes Yes <Null> No

Polyline PF Replace Replaceme Revised pe Unknown USBP ‐ San Unknown ( Yes Yes <Null> No

Polyline PF Replace Replaceme Revised pe Unknown USBP ‐ San Unknown ( Yes Yes <Null> No

Polyline PF Replace Replaceme Revised pe Unknown USBP ‐ San Unknown ( Yes Yes <Null> No

Polyline PF Replace Replaceme Revised pe Unknown USBP ‐ San Unknown ( Yes Yes <Null> No

Polyline PF Replace Replaceme Revised pe Unknown USBP ‐ San Unknown ( Yes Yes <Null> No

Polyline PF Replace Replaceme Revised pe Unknown USBP ‐ San Unknown ( Yes Yes <Null> No

Polyline PF Replace Replaceme Revised pe Unknown USBP ‐ San Unknown ( Yes Yes <Null> No

Polyline PF Replace Replaceme Revised pe Unknown USBP ‐ San Unknown ( Yes Yes <Null> No

Polyline PF Replace Replaceme Revised pe Unknown USBP ‐ San Unknown ( Yes Yes <Null> No

Polyline PF Replace Replaceme Revised pe Unknown USBP ‐ San Unknown ( Yes Yes <Null> No

Polyline PF Replace Replaceme Revised pe Unknown USBP ‐ San Unknown ( Yes Yes <Null> No

Polyline PF Replace Replaceme Revised pe Unknown USBP ‐ San Unknown ( Yes Yes <Null> No

Polyline PF Replace Replaceme Revised pe Unknown USBP ‐ San Unknown ( Yes Yes <Null> No

Polyline PF Replace Replaceme Revised pe Unknown USBP ‐ San Unknown ( Yes Yes <Null> No

Polyline PF Replace Replaceme Revised pe Unknown USBP ‐ San Unknown ( Yes Yes <Null> No

Polyline PF Replace Replaceme Revised pe Unknown USBP ‐ San Unknown ( Yes Yes <Null> No

Polyline PF Replace Replaceme Revised pe Unknown USBP ‐ San Unknown ( Yes Yes <Null> No

Polyline PF Replace Replaceme Revised pe Unknown USBP ‐ San Unknown ( Yes Yes <Null> No

Polyline PF Primary Operationa Revised pe Unknown USBP ‐ San Unknown ( Yes No <Null> No

Polyline PF Primary Operationa Revised pe Unknown USBP ‐ San Unknown ( Yes No <Null> No

Polyline PF Primary Operationa Revised pe Unknown USBP ‐ San Unknown ( No No <Null> No

Polyline PF Primary Operationa Revised pe Unknown USBP ‐ San Unknown ( Yes No <Null> No

Polyline PF Primary Operationa Revised pe Unknown USBP ‐ San Unknown ( Yes No <Null> <Null>

Polyline PF Primary Operationa Revised pe Unknown USBP ‐ San Unknown ( No No <Null> <Null>

Polyline PF Primary Operationa Revised pe Unknown USBP ‐ San Unknown ( Yes No <Null> <Null>

Polyline PF Replace Replaceme Revised pe Unknown USBP ‐ San Unknown ( Yes Yes <Null> No

Polyline PF Replace Replaceme Revised pe Unknown USBP ‐ San Unknown ( Yes Yes <Null> No

Polyline PF Replace Replaceme Revised pe Unknown USBP ‐ San Unknown ( Yes Yes <Null> No

Polyline PF Replace Replaceme Revised pe Unknown USBP ‐ San Unknown ( Yes Yes <Null> No

Polyline PF Primary Operationa Revised pe Unknown USBP ‐ San Unknown ( Yes No <Null> No

Polyline PF Replace Replaceme Revised pe Unknown USBP ‐ San Unknown ( Yes Yes <Null> No

Polyline PF SecondaOperationa Revised pe Unknown USBP ‐ San Unknown ( Yes Yes <Null> <Null>

Polyline PF SecondaOperationa Revised pe Unknown USBP ‐ San Unknown ( Yes Yes <Null> <Null>

Polyline PF SecondaOperationa Revised pe Unknown USBP ‐ San Unknown ( Yes Yes <Null> <Null>

Polyline PF SecondaOperationa Revised pe Unknown USBP ‐ San Unknown ( Yes Yes <Null> <Null>

Polyline PF SecondaOperationa Revised pe Unknown USBP ‐ San Unknown ( Yes Yes <Null> <Null>

Polyline PF SecondaOperationa Revised pe Unknown USBP ‐ San Unknown ( Yes Yes <Null> <Null>

Polyline PF SecondaOperationa Revised pe Unknown USBP ‐ San Unknown ( Yes Yes <Null> <Null>

Polyline PF SecondaOperationa Revised pe Unknown USBP ‐ San Unknown ( Yes Yes <Null> <Null>

Polyline PF Primary Operationa Revised pe Unknown USBP ‐ San Unknown ( Yes No <Null> No

Polyline PF Primary Operationa Revised pe Unknown USBP ‐ San Unknown ( Yes No <Null> No

Polyline PF Primary Operationa Revised pe Unknown USBP ‐ San Unknown ( No No <Null> No

Polyline PF SecondaOperationa Revised pe Unknown USBP ‐ San Unknown ( Yes Yes <Null> <Null>

Polyline PF Replace Replaceme Revised pe Unknown USBP ‐ San Unknown ( Yes Yes <Null> No

BW11 FOIA CBP 003171

(b) (7)(E)

(b) (7)(E)(b) (7)(E) (b) (7)(E)(b) (7)(E)

EZAISA6
Sticky Note
None set by EZAISA6
EZAISA6
Sticky Note
MigrationNone set by EZAISA6
EZAISA6
Sticky Note
Unmarked set by EZAISA6
EZAISA6
Sticky Note
None set by EZAISA6
EZAISA6
Sticky Note
MigrationNone set by EZAISA6
EZAISA6
Sticky Note
Unmarked set by EZAISA6
EZAISA6
Sticky Note
None set by EZAISA6
EZAISA6
Sticky Note
MigrationNone set by EZAISA6
EZAISA6
Sticky Note
Unmarked set by EZAISA6
EZAISA6
Sticky Note
None set by EZAISA6
EZAISA6
Sticky Note
MigrationNone set by EZAISA6
EZAISA6
Sticky Note
Unmarked set by EZAISA6
Page 136: From: To: Cc: Subject: FW: TI Presidential Transition (FINAL … · 2019-04-15 · Subject: FW: TI Presidential Transition (FINAL 2).pptx FENCE & ROADS ALCON, Please find attached

Polyline PF Primary Operationa Revised pe Unknown USBP ‐ San Unknown ( Yes No <Null> No

Polyline PF Replace Replaceme Revised pe Unknown USBP ‐ San Unknown ( Yes Yes <Null> No

Polyline PF Primary Operationa Revised pe Unknown USBP ‐ San Unknown ( Yes No <Null> No

Polyline PF Replace Replaceme Revised pe Unknown USBP ‐ San Unknown ( Yes Yes <Null> No

Polyline PF Primary Operationa Revised pe Unknown USBP ‐ San Unknown ( Yes No <Null> No

Polyline PF Replace Replaceme Revised pe Unknown USBP ‐ San Unknown ( Yes Yes <Null> No

Polyline PF Replace Replaceme Revised pe Unknown USBP ‐ San Unknown ( Yes Yes <Null> No

Polyline PF Replace Replaceme Revised pe Unknown USBP ‐ San Unknown ( Yes Yes <Null> No

Polyline PF Replace Replaceme Revised pe Unknown USBP ‐ San Unknown ( Yes Yes <Null> No

Polyline PF Primary Operationa Revised pe Unknown USBP ‐ San Unknown ( Yes No <Null> No

Polyline PF Replace Replaceme Revised pe Unknown USBP ‐ San Unknown ( Yes Yes <Null> No

Polyline PF Replace Replaceme Revised pe Unknown USBP ‐ San Unknown ( Yes Yes <Null> No

Polyline PF Replace Replaceme Revised pe Unknown USBP ‐ San Unknown ( Yes Yes <Null> No

Polyline PF Replace Replaceme Revised pe Unknown USBP ‐ San Unknown ( Yes Yes <Null> No

Polyline PF Primary Operationa Revised pe Unknown USBP ‐ San Unknown ( No No <Null> No

Polyline PF Primary Operationa Revised pe Unknown USBP ‐ San Unknown ( Yes No <Null> No

Polyline PF Replace Replaceme Revised pe Unknown USBP ‐ San Unknown ( Yes Yes <Null> No

Polyline PF Replace Replaceme Revised pe Unknown USBP ‐ San Unknown ( Yes Yes <Null> No

Polyline PF Primary Operationa Revised pe Unknown USBP ‐ San Unknown ( Yes No <Null> No

Polyline PF Replace Replaceme Revised pe Unknown USBP ‐ San Unknown ( Yes Yes <Null> No

Polyline PF Primary Operationa Revised pe Unknown USBP ‐ San Unknown ( Yes No <Null> No

Polyline PF Primary Operationa Revised pe Unknown USBP ‐ San Unknown ( Yes No <Null> No

Polyline PF SecondaOperationa Revised pe Unknown USBP ‐ San Unknown ( Yes Yes Existing ‐ P <Null>

Polyline PF SecondaOperationa Revised pe Unknown USBP ‐ San Unknown ( Yes Yes Existing ‐ P <Null>

Polyline PF SecondaOperationa Revised pe Unknown USBP ‐ San Unknown ( Yes Yes Existing ‐ P <Null>

Polyline PF SecondaOperationa Revised pe Unknown USBP ‐ San Unknown ( Yes Yes Existing ‐ P <Null>

Polyline PF SecondaOperationa Revised pe Unknown USBP ‐ San Unknown ( Yes Yes Existing ‐ P <Null>

Polyline PF SecondaOperationa Revised pe Unknown USBP ‐ San Unknown ( Yes Yes Existing ‐ P <Null>

Polyline PF SecondaOperationa Revised pe Unknown USBP ‐ San Unknown ( Yes Yes Existing ‐ P <Null>

Polyline PF SecondaOperationa Revised pe Unknown USBP ‐ San Unknown ( Yes Yes Existing ‐ P <Null>

Polyline PF SecondaOperationa Revised pe Unknown USBP ‐ San Unknown ( Yes Yes Existing ‐ P <Null>

Polyline PF SecondaOperationa Revised pe Unknown USBP ‐ San Unknown ( Yes Yes Existing ‐ P <Null>

Polyline PF SecondaOperationa Revised pe Unknown USBP ‐ San Unknown ( Yes Yes Existing ‐ P <Null>

Polyline PF SecondaOperationa Revised pe Unknown USBP ‐ San Unknown ( Yes Yes Existing ‐ P <Null>

Polyline PF SecondaOperationa Revised pe Unknown USBP ‐ San Unknown ( Yes Yes Existing ‐ P <Null>

Polyline PF SecondaOperationa Revised pe Unknown USBP ‐ San Unknown ( Yes Yes Existing ‐ P <Null>

Polyline PF SecondaOperationa Revised pe Unknown USBP ‐ San Unknown ( Yes Yes Existing ‐ P <Null>

Polyline PF SecondaOperationa  New SUnknown USBP ‐ YumUnknown ( Yes Yes <Null> <Null>

Polyline PF SecondaOperationa New SUnknown USBP ‐ YumUnknown ( Yes Yes <Null> <Null>

Polyline PF SecondaOperationa New SUnknown USBP ‐ YumUnknown ( Yes Yes <Null> <Null>

Polyline PF SecondaOperationa New SUnknown USBP ‐ YumUnknown ( Yes Yes <Null> <Null>

Polyline PF Replace Replaceme PF Repl Unknown USBP ‐ YumUnknown ( Yes Yes <Null> No

Polyline PF Primary Operationa SHP from S USBP ‐ Rio  <Null> Yes No <Null> <Null>

Polyline PF Primary Operationa SHP from S USBP ‐ Rio  <Null> Yes No <Null> <Null>

Polyline PF Primary Operationa SHP from S USBP ‐ Rio  <Null> Yes No <Null> <Null>

Polyline PF Primary Operationa SHP from S USBP ‐ Rio  <Null> Yes No <Null> <Null>

Polyline PF Primary Operationa SHP from S USBP ‐ Rio  <Null> No No <Null> <Null>

Polyline PF Primary Operationa SHP from S USBP ‐ Rio  <Null> Yes No <Null> <Null>

Polyline PF Primary Operationa SHP from S USBP ‐ Rio  <Null> No No <Null> <Null>

Polyline PF Primary Operationa SHP from S USBP ‐ Rio  <Null> Yes No <Null> <Null>

Polyline PF Primary Operationa SHP from S USBP ‐ Rio  <Null> No No <Null> <Null>

Polyline PF Primary Operationa SHP from S USBP ‐ Rio  <Null> Yes No <Null> <Null>

Polyline PF Primary Operationa SHP from S USBP ‐ Rio  <Null> No No <Null> <Null>

Polyline PF Primary Operationa SHP from S USBP ‐ Rio  <Null> Yes No <Null> <Null>

Polyline PF Primary Operationa SHP from S USBP ‐ Rio  <Null> No No <Null> <Null>

Polyline PF Primary Operationa SHP from S USBP ‐ Rio  <Null> Yes No <Null> <Null>

Polyline PF Primary Operationa SHP from S USBP ‐ Rio  <Null> No No <Null> <Null>

Polyline PF Primary Operationa SHP from S USBP ‐ Rio  <Null> Yes No <Null> <Null>

Polyline PF Primary Operationa SHP from S USBP ‐ Rio  <Null> No No <Null> <Null>

Polyline PF Primary Operationa SHP from S USBP ‐ Rio  <Null> Yes No <Null> <Null>

Polyline PF Primary Operationa SHP from S USBP ‐ Rio  <Null> No No <Null> <Null>

Polyline PF Primary Operationa SHP from S USBP ‐ Rio  <Null> Yes No <Null> <Null>

Polyline PF Primary Operationa SHP from S USBP ‐ Rio  <Null> No No <Null> <Null>

Polyline PF Primary Operationa SHP from S USBP ‐ Rio  <Null> Yes No <Null> <Null>

Polyline PF Primary Operationa SHP from S USBP ‐ Rio  <Null> No No <Null> <Null>

Polyline PF Primary Operationa SHP from S USBP ‐ Rio  <Null> Yes No <Null> <Null>

Polyline PF Primary Operationa SHP from S USBP ‐ Rio  <Null> No No <Null> <Null>

Polyline PF Primary Operationa SHP from S USBP ‐ Rio  <Null> Yes No <Null> <Null>

Polyline PF Primary Operationa SHP from S USBP ‐ Rio  <Null> No No <Null> <Null>

Polyline PF Primary Operationa SHP from S USBP ‐ Rio  <Null> Yes No <Null> <Null>

Polyline PF Primary Operationa SHP from S USBP ‐ Rio  <Null> No No <Null> <Null>

BW11 FOIA CBP 003172

(b) (7)(E)

(b) (7)(E)(b) (7)(E) (b) (7)(E)

(b) (7)(E)

(b) (7)(E)

EZAISA6
Sticky Note
None set by EZAISA6
EZAISA6
Sticky Note
MigrationNone set by EZAISA6
EZAISA6
Sticky Note
Unmarked set by EZAISA6
EZAISA6
Sticky Note
None set by EZAISA6
EZAISA6
Sticky Note
MigrationNone set by EZAISA6
EZAISA6
Sticky Note
Unmarked set by EZAISA6
EZAISA6
Sticky Note
None set by EZAISA6
EZAISA6
Sticky Note
MigrationNone set by EZAISA6
EZAISA6
Sticky Note
Unmarked set by EZAISA6
EZAISA6
Sticky Note
None set by EZAISA6
EZAISA6
Sticky Note
MigrationNone set by EZAISA6
EZAISA6
Sticky Note
Unmarked set by EZAISA6
Page 137: From: To: Cc: Subject: FW: TI Presidential Transition (FINAL … · 2019-04-15 · Subject: FW: TI Presidential Transition (FINAL 2).pptx FENCE & ROADS ALCON, Please find attached

Polyline PF Primary Operationa SHP from S USBP ‐ Rio  <Null> Yes No <Null> <Null>

Polyline PF Primary Operationa SHP from S USBP ‐ Rio  <Null> No No <Null> <Null>

Polyline PF Primary Operationa SHP from S USBP ‐ Rio  <Null> No No <Null> <Null>

Polyline PF Primary Operationa SHP from S USBP ‐ Rio  <Null> Yes No <Null> <Null>

Polyline PF Primary Operationa SHP from S USBP ‐ Rio  <Null> No No <Null> <Null>

Polyline PF Primary Operationa SHP from S USBP ‐ Rio  <Null> No No <Null> <Null>

Polyline PF Primary Operationa SHP from S USBP ‐ Rio  <Null> Yes No <Null> <Null>

Polyline PF Primary Operationa SHP from S USBP ‐ Rio  <Null> No No <Null> <Null>

Polyline PF Primary Operationa SHP from S USBP ‐ Rio  <Null> Yes No <Null> <Null>

Polyline PF Primary Operationa SHP from S USBP ‐ Rio  <Null> Yes No <Null> <Null>

Polyline PF Primary Operationa SHP from S USBP ‐ Rio  <Null> No No <Null> <Null>

Polyline PF Primary Operationa SHP from S USBP ‐ Rio  <Null> Yes No <Null> <Null>

Polyline PF Primary Operationa SHP from S USBP ‐ Rio  <Null> No No <Null> <Null>

Polyline PF Primary Operationa SHP from S USBP ‐ Rio  <Null> Yes No <Null> <Null>

Polyline PF Primary Operationa SHP from S USBP ‐ Rio  <Null> Yes No <Null> <Null>

Polyline PF Primary Operationa SHP from S USBP ‐ Rio  <Null> No No <Null> <Null>

Polyline PF Primary Operationa SHP from S USBP ‐ Rio  <Null> Yes No <Null> <Null>

Polyline PF Primary Operationa SHP from S USBP ‐ Rio  <Null> No No <Null> <Null>

Polyline PF Primary Operationa SHP from S USBP ‐ Rio  <Null> Yes No <Null> <Null>

Polyline PF Primary Operationa SHP from S USBP ‐ Rio  <Null> No No <Null> <Null>

Polyline PF Primary Operationa SHP from S USBP ‐ Rio  <Null> Yes No <Null> <Null>

Polyline PF Primary Operationa SHP from S USBP ‐ Rio  <Null> No No <Null> <Null>

Polyline PF Primary Operationa SHP from S USBP ‐ Rio  <Null> Yes No <Null> <Null>

Polyline PF Primary Operationa SHP from S USBP ‐ Rio  <Null> No No <Null> <Null>

Polyline PF Primary Operationa SHP from S USBP ‐ Rio  <Null> Yes No <Null> <Null>

Polyline PF Primary Operationa SHP from S USBP ‐ Rio  <Null> Yes No <Null> <Null>

Polyline PF Primary Operationa SHP from S USBP ‐ Rio  <Null> No No <Null> <Null>

Polyline PF Primary Operationa SHP from S USBP ‐ Rio  <Null> Yes No <Null> <Null>

Polyline PF Primary Operationa SHP from S USBP ‐ Rio  <Null> No No <Null> <Null>

Polyline PF Primary Operationa SHP from S USBP ‐ Rio  <Null> Yes No <Null> <Null>

Polyline PF Primary Operationa SHP from S USBP ‐ Rio  <Null> No No <Null> <Null>

Polyline PF Primary Operationa SHP from S USBP ‐ Rio  <Null> Yes No <Null> <Null>

Polyline PF Primary Operationa SHP from S USBP ‐ Rio  <Null> No No <Null> <Null>

Polyline PF Primary Operationa SHP from S USBP ‐ Rio  <Null> No No <Null> <Null>

Polyline PF Primary Operationa SHP from S USBP ‐ Rio  <Null> Yes No <Null> <Null>

Polyline PF Primary Operationa SHP from S USBP ‐ Rio  <Null> Yes No <Null> <Null>

Polyline PF Primary Operationa SHP from S USBP ‐ Rio  <Null> No No <Null> <Null>

Polyline PF Primary Operationa SHP from S USBP ‐ Rio  <Null> Yes No <Null> <Null>

Polyline PF Primary Operationa SHP from S USBP ‐ Rio  <Null> No No <Null> <Null>

Polyline PF Primary Operationa SHP from S USBP ‐ Rio  <Null> No No <Null> <Null>

Polyline PF Primary Operationa SHP from S USBP ‐ Rio  <Null> Yes No <Null> <Null>

Polyline PF Primary Operationa SHP from S USBP ‐ Rio  <Null> No No <Null> <Null>

Polyline PF Primary Operationa SHP from S USBP ‐ Rio  <Null> Yes No <Null> <Null>

Polyline PF Primary Operationa SHP from S USBP ‐ Rio  <Null> No No <Null> <Null>

Polyline PF Primary Operationa SHP from S USBP ‐ Rio  <Null> Yes No <Null> <Null>

Polyline PF Primary Operationa SHP from S TX USBP ‐ Rio  <Null> No No <Null>

Polyline PF Primary Operationa SHP from S USBP ‐ Rio  <Null> No No <Null> <Null>

Polyline PF Primary Operationa SHP from S USBP ‐ Rio  <Null> Yes No <Null>

Polyline PF Primary Operationa SHP from S USBP ‐ Rio  <Null> Yes No <Null> <Null>

Polyline PF Primary Operationa SHP from S USBP ‐ Rio  <Null> Yes No <Null>

Polyline PF Primary Operationa SHP from S USBP ‐ Rio  <Null> Yes No <Null>

Polyline PF Primary Operationa SHP from S USBP ‐ Rio  <Null> Yes No <Null>

Polyline PF Primary Operationa SHP from S USBP ‐ Rio  <Null> Yes No <Null>

Polyline PF Primary Operationa SHP from S USBP ‐ Rio  <Null> Yes No <Null> <Null>

Polyline PF Primary Operationa SHP from S USBP ‐ Rio  <Null> Yes No <Null> <Null>

Polyline PF Primary Operationa SHP from S USBP ‐ Rio  <Null> Yes No <Null>

Polyline PF Primary Operationa SHP from S USBP ‐ Rio  <Null> Yes No <Null> <Null>

Polyline PF Primary Operationa SHP from S USBP ‐ Rio  <Null> No No <Null> <Null>

Polyline PF Primary Operationa SHP from S USBP ‐ Rio  <Null> Yes No <Null> <Null>

Polyline PF Primary Operationa SHP from S USBP ‐ Rio  <Null> No No <Null> <Null>

Polyline PF Primary Operationa SHP from S USBP ‐ Rio  <Null> Yes No <Null> <Null>

Polyline PF Primary Operationa SHP from S USBP ‐ Rio  <Null> No No <Null> <Null>

Polyline PF Primary Operationa SHP from S USBP ‐ Rio  <Null> Yes No <Null> <Null>

Polyline PF Primary Operationa SHP from S USBP ‐ Rio  <Null> No No <Null> <Null>

Polyline PF Primary Operationa SHP from S USBP ‐ Rio  <Null> No No <Null> <Null>

Polyline PF Primary Operationa SHP from S USBP ‐ Rio  <Null> Yes No <Null> <Null>

Polyline PF Primary Operationa SHP from S USBP ‐ Rio  <Null> Yes No <Null> <Null>

Polyline PF Primary Operationa SHP from S TX USBP ‐ Rio  <Null> No No <Null> <Null>

Polyline PF Primary Operationa SHP from S USBP ‐ Rio  <Null> Yes No <Null> <Null>

Polyline PF Primary Operationa SHP from S USBP ‐ Rio  <Null> No No <Null> <Null>

Polyline PF Primary Operationa SHP from S USBP ‐ Rio  <Null> Yes No <Null> <Null>

BW11 FOIA CBP 003173

(b) (7)(E)

(b) (7)(E)(b) (7)(E) (b) (7)(E)

EZAISA6
Sticky Note
None set by EZAISA6
EZAISA6
Sticky Note
MigrationNone set by EZAISA6
EZAISA6
Sticky Note
Unmarked set by EZAISA6
EZAISA6
Sticky Note
None set by EZAISA6
EZAISA6
Sticky Note
MigrationNone set by EZAISA6
EZAISA6
Sticky Note
Unmarked set by EZAISA6
EZAISA6
Sticky Note
None set by EZAISA6
EZAISA6
Sticky Note
MigrationNone set by EZAISA6
EZAISA6
Sticky Note
Unmarked set by EZAISA6
EZAISA6
Sticky Note
None set by EZAISA6
EZAISA6
Sticky Note
MigrationNone set by EZAISA6
EZAISA6
Sticky Note
Unmarked set by EZAISA6
Page 138: From: To: Cc: Subject: FW: TI Presidential Transition (FINAL … · 2019-04-15 · Subject: FW: TI Presidential Transition (FINAL 2).pptx FENCE & ROADS ALCON, Please find attached

Polyline PF Primary Operationa SHP from S USBP ‐ Rio  <Null> No No <Null> <Null>

Polyline PF Primary Operationa SHP from S USBP ‐ Rio  <Null> Yes No <Null> <Null>

Polyline PF Primary Operationa SHP from S USBP ‐ Rio  <Null> No No <Null> <Null>

Polyline PF Primary Operationa SHP from S USBP ‐ Rio  <Null> Yes No <Null> <Null>

Polyline PF Primary Operationa SHP from S USBP ‐ Rio  <Null> No No <Null> <Null>

Polyline PF Primary Operationa SHP from S USBP ‐ Rio  <Null> Yes No <Null> <Null>

Polyline PF Primary Operationa SHP from S USBP ‐ Rio  <Null> No No <Null> <Null>

Polyline PF Primary Operationa SHP from S USBP ‐ Rio  <Null> Yes No <Null> <Null>

Polyline PF Primary Operationa SHP from S USBP ‐ Rio  <Null> Yes No <Null> <Null>

Polyline PF Primary Operationa SHP from S USBP ‐ Rio  <Null> Yes No <Null> <Null>

Polyline PF Primary Operationa SHP from S USBP ‐ Rio  <Null> No No <Null> <Null>

Polyline PF Primary Operationa SHP from S USBP ‐ Rio  <Null> No No <Null> <Null>

Polyline PF Primary Operationa SHP from S USBP ‐ Rio  <Null> Yes No <Null> <Null>

Polyline PF Primary Operationa SHP from S USBP ‐ Rio  <Null> No No <Null> <Null>

Polyline PF Primary Operationa SHP from S USBP ‐ Rio  <Null> Yes No <Null> <Null>

Polyline PF Primary Operationa SHP from S USBP ‐ Rio  <Null> Yes No <Null> <Null>

Polyline PF Primary Operationa SHP from S USBP ‐ Rio  <Null> No No <Null> <Null>

Polyline PF Primary Operationa SHP from S USBP ‐ Rio  <Null> No No <Null> <Null>

Polyline PF Primary Operationa SHP from S USBP ‐ Rio  <Null> Yes No <Null> <Null>

Polyline PF Primary Operationa SHP from S USBP ‐ Rio  <Null> No No <Null> <Null>

Polyline PF Primary Operationa SHP from S USBP ‐ Rio  <Null> Yes No <Null> <Null>

Polyline PF Primary Operationa SHP from S USBP ‐ Rio  <Null> No No <Null> <Null>

Polyline PF Primary Operationa SHP from S USBP ‐ Rio  <Null> No No <Null> <Null>

Polyline PF Primary Operationa SHP from S USBP ‐ Rio  <Null> Yes No <Null> <Null>

Polyline PF Primary Operationa SHP from S USBP ‐ Rio  <Null> No No <Null> <Null>

Polyline PF Primary Operationa SHP from S USBP ‐ Rio  <Null> No No <Null> <Null>

Polyline PF Primary Operationa SHP from S USBP ‐ Rio  <Null> Yes No <Null> <Null>

Polyline PF Primary Operationa SHP from S USBP ‐ Rio  <Null> No No <Null> <Null>

Polyline PF Primary Operationa SHP from S USBP ‐ Rio  <Null> Yes No <Null> <Null>

Polyline PF Primary Operationa SHP from S USBP ‐ Rio  <Null> Yes No <Null> <Null>

Polyline PF Primary Operationa SHP from S USBP ‐ Rio  <Null> No No <Null> <Null>

Polyline PF Primary Operationa SHP from S USBP ‐ Rio  <Null> Yes No <Null> <Null>

Polyline PF Primary Operationa SHP from S USBP ‐ Rio  <Null> No No <Null> <Null>

Polyline PF Primary Operationa SHP from S USBP ‐ Rio  <Null> Yes No <Null> <Null>

Polyline PF Primary Operationa SHP from S USBP ‐ Rio  <Null> No No <Null> <Null>

Polyline PF Primary Operationa SHP from S USBP ‐ Rio  <Null> Yes No <Null> <Null>

Polyline PF Primary Operationa SHP from S USBP ‐ Rio  <Null> No No <Null> <Null>

Polyline PF Primary Operationa SHP from S USBP ‐ Rio  <Null> Yes No <Null> <Null>

Polyline PF Primary Operationa SHP from S USBP ‐ Rio  <Null> Yes No <Null> <Null>

Polyline PF Primary Operationa SHP from S USBP ‐ Rio  <Null> No No <Null> <Null>

Polyline PF Primary Operationa SHP from S USBP ‐ Rio  <Null> Yes No <Null> <Null>

Polyline PF Primary Operationa SHP from S USBP ‐ Rio  <Null> No No <Null> <Null>

Polyline PF Primary Operationa SHP from S USBP ‐ Rio  <Null> No No <Null> <Null>

Polyline PF Primary Operationa SHP from S USBP ‐ Rio  <Null> Yes No <Null> <Null>

Polyline PF Primary Operationa SHP from S USBP ‐ Rio  <Null> No No <Null> <Null>

Polyline PF Primary Operationa SHP from S USBP ‐ Rio  <Null> Yes No <Null> <Null>

Polyline PF Primary Operationa SHP from S USBP ‐ Rio  <Null> No No <Null> <Null>

Polyline PF Primary Operationa SHP from S USBP ‐ Rio  <Null> No No <Null> <Null>

Polyline PF Primary Operationa SHP from S USBP ‐ Rio  <Null> Yes No <Null> <Null>

Polyline PF Primary Operationa SHP from S USBP ‐ Rio  <Null> No No <Null> <Null>

Polyline PF Primary Operationa SHP from S USBP ‐ Rio  <Null> Yes No <Null> <Null>

Polyline PF Primary Operationa SHP from S USBP ‐ Rio  <Null> No No <Null> <Null>

Polyline PF Primary Operationa SHP from S USBP ‐ Rio  <Null> Yes No <Null> <Null>

Polyline PF Primary Operationa SHP from S USBP ‐ Rio  <Null> No No <Null> <Null>

Polyline PF Primary Operationa SHP from S USBP ‐ Rio  <Null> Yes No <Null> <Null>

Polyline PF Primary Operationa SHP from S USBP ‐ Rio  <Null> No No <Null> <Null>

Polyline PF Primary Operationa SHP from S USBP ‐ Rio  <Null> Yes No <Null> <Null>

Polyline PF Primary Operationa SHP from S USBP ‐ Rio  <Null> No No <Null> <Null>

Polyline PF Primary Operationa SHP from S USBP ‐ Rio  <Null> Yes No <Null> <Null>

Polyline PF Primary Operationa SHP from S USBP ‐ Rio  <Null> No No <Null> <Null>

Polyline PF Primary Operationa SHP from S USBP ‐ Rio  <Null> Yes No <Null> <Null>

Polyline PF Primary Operationa SHP from S USBP ‐ Rio  <Null> No No <Null> <Null>

Polyline PF Primary Operationa SHP from S USBP ‐ Rio  <Null> Yes No <Null> <Null>

Polyline PF Primary Operationa SHP from S USBP ‐ Rio  <Null> No No <Null> <Null>

Polyline PF Primary Operationa SHP from S USBP ‐ Rio  <Null> Yes No <Null> <Null>

Polyline PF Primary Operationa SHP from S USBP ‐ Rio  <Null> Yes No <Null> <Null>

Polyline PF Primary Operationa SHP from S USBP ‐ Rio  <Null> Yes No <Null> <Null>

Polyline PF Primary Operationa SHP from S USBP ‐ Rio  <Null> No No <Null> <Null>

Polyline PF Primary Operationa SHP from S USBP ‐ Rio  <Null> Yes No <Null> <Null>

Polyline PF Primary Operationa SHP from S USBP ‐ Rio  <Null> No No <Null> <Null>

Polyline PF Primary Operationa SHP from S USBP ‐ Rio  <Null> Yes No <Null> <Null>

BW11 FOIA CBP 003174

(b) (7)(E)

(b) (7)(E)(b) (7)(E) (b) (7)(E)

EZAISA6
Sticky Note
None set by EZAISA6
EZAISA6
Sticky Note
MigrationNone set by EZAISA6
EZAISA6
Sticky Note
Unmarked set by EZAISA6
EZAISA6
Sticky Note
None set by EZAISA6
EZAISA6
Sticky Note
MigrationNone set by EZAISA6
EZAISA6
Sticky Note
Unmarked set by EZAISA6
EZAISA6
Sticky Note
None set by EZAISA6
EZAISA6
Sticky Note
MigrationNone set by EZAISA6
EZAISA6
Sticky Note
Unmarked set by EZAISA6
EZAISA6
Sticky Note
None set by EZAISA6
EZAISA6
Sticky Note
MigrationNone set by EZAISA6
EZAISA6
Sticky Note
Unmarked set by EZAISA6
Page 139: From: To: Cc: Subject: FW: TI Presidential Transition (FINAL … · 2019-04-15 · Subject: FW: TI Presidential Transition (FINAL 2).pptx FENCE & ROADS ALCON, Please find attached

Polyline PF Primary Operationa SHP from S USBP ‐ Rio  <Null> No No <Null> <Null>

Polyline PF Primary Operationa SHP from S USBP ‐ Rio  <Null> Yes No <Null> <Null>

Polyline PF Primary Operationa SHP from S USBP ‐ Rio  <Null> No No <Null> <Null>

Polyline PF Primary Operationa SHP from S USBP ‐ Rio  <Null> Yes No <Null> <Null>

Polyline PF Primary Operationa SHP from S USBP ‐ Rio  <Null> No No <Null> <Null>

Polyline PF Primary Operationa SHP from S USBP ‐ Rio  <Null> Yes No <Null> <Null>

Polyline PF Primary Operationa SHP from S USBP ‐ Rio  <Null> No No <Null> <Null>

Polyline PF Primary Operationa SHP from S USBP ‐ Rio  <Null> Yes No <Null> <Null>

Polyline PF Primary Operationa SHP from S USBP ‐ Rio  <Null> No No <Null> <Null>

Polyline PF Primary Operationa SHP from S USBP ‐ Rio  <Null> Yes No <Null> <Null>

Polyline PF Primary Operationa SHP from S USBP ‐ Rio  <Null> No No <Null> <Null>

Polyline PF Primary Operationa SHP from S USBP ‐ Rio  <Null> Yes No <Null> <Null>

Polyline PF Primary Operationa SHP from S USBP ‐ Rio  <Null> No No <Null> <Null>

Polyline PF Primary Operationa SHP from S USBP ‐ Rio  <Null> Yes No <Null> <Null>

Polyline PF Primary Operationa SHP from S USBP ‐ Rio  <Null> No No <Null> <Null>

Polyline PF Primary Operationa SHP from S USBP ‐ Rio  <Null> Yes No <Null> <Null>

Polyline PF Primary Operationa SHP from S USBP ‐ Rio  <Null> No No <Null> <Null>

Polyline PF Primary Operationa SHP from S USBP ‐ Rio  <Null> Yes No <Null> <Null>

Polyline PF Primary Operationa SHP from S USBP ‐ Rio  <Null> No No <Null> <Null>

Polyline PF Primary Operationa SHP from S USBP ‐ Rio  <Null> Yes No <Null> <Null>

Polyline PF Primary Operationa SHP from S USBP ‐ Rio  <Null> No No <Null> <Null>

Polyline PF Primary Operationa SHP from S USBP ‐ Rio  <Null> Yes No <Null> <Null>

Polyline PF Primary Operationa SHP from S USBP ‐ Rio  <Null> No No <Null> <Null>

Polyline PF Primary Operationa SHP from S USBP ‐ Rio  <Null> Yes No <Null> <Null>

Polyline PF Primary Operationa SHP from S USBP ‐ Rio  <Null> No No <Null> <Null>

Polyline PF Primary Operationa SHP from S USBP ‐ Rio  <Null> Yes No <Null> <Null>

Polyline PF Primary Operationa SHP from S USBP ‐ Rio  <Null> No No <Null> <Null>

Polyline PF Primary Operationa SHP from S USBP ‐ Rio  <Null> Yes No <Null> <Null>

Polyline PF Primary Operationa SHP from S USBP ‐ Rio  <Null> No No <Null> <Null>

Polyline PF Primary Operationa SHP from S USBP ‐ Rio  <Null> Yes No <Null> <Null>

Polyline PF Primary Operationa SHP from S USBP ‐ Rio  <Null> No No <Null> <Null>

Polyline PF Primary Operationa SHP from S USBP ‐ Rio  <Null> Yes No <Null> <Null>

Polyline PF Primary Operationa SHP from S USBP ‐ Rio  <Null> No No <Null> <Null>

Polyline PF Primary Operationa SHP from S USBP ‐ Rio  <Null> Yes No <Null> <Null>

Polyline PF Primary Operationa SHP from S USBP ‐ Rio  <Null> No No <Null> <Null>

Polyline PF Primary Operationa SHP from S USBP ‐ Rio  <Null> Yes No <Null> <Null>

Polyline PF Primary Operationa SHP from S USBP ‐ Rio  <Null> No No <Null> <Null>

Polyline PF Primary Operationa SHP from S USBP ‐ Rio  <Null> No No <Null> <Null>

Polyline PF Primary Operationa SHP from S USBP ‐ Rio  <Null> Yes No <Null> <Null>

Polyline PF Primary Operationa SHP from S TX USBP ‐ Rio  <Null> No No <Null> <Null>

Polyline PF Primary Operationa SHP from S USBP ‐ Rio  <Null> Yes No <Null> <Null>

Polyline PF Primary Operationa SHP from S USBP ‐ Rio  <Null> No No <Null> <Null>

Polyline PF Primary Operationa SHP from S USBP ‐ Rio  <Null> Yes No <Null> <Null>

Polyline PF Primary Operationa SHP from S USBP ‐ Rio  <Null> No No <Null> <Null>

Polyline PF Primary Operationa SHP from S USBP ‐ Rio  <Null> Yes No <Null> <Null>

Polyline PF Primary Operationa SHP from S USBP ‐ Rio  <Null> No No <Null> <Null>

Polyline PF Primary Operationa SHP from S USBP ‐ Rio  <Null> Yes No <Null> <Null>

Polyline PF Primary Operationa SHP from S USBP ‐ Rio  <Null> No No <Null> <Null>

Polyline PF Primary Operationa SHP from S USBP ‐ Rio  <Null> Yes No <Null> <Null>

Polyline PF Primary Operationa SHP from S USBP ‐ Rio  <Null> No No <Null> <Null>

Polyline PF Primary Operationa SHP from S USBP ‐ Rio  <Null> Yes No <Null> <Null>

Polyline PF Primary Operationa SHP from S USBP ‐ Rio  <Null> Yes No <Null> <Null>

Polyline PF Primary Operationa SHP from S USBP ‐ Rio  <Null> No No <Null> <Null>

Polyline PF Primary Operationa SHP from S USBP ‐ Rio  <Null> Yes No <Null> <Null>

Polyline PF Primary Operationa SHP from S USBP ‐ Rio  <Null> No No <Null> <Null>

Polyline PF Primary Operationa SHP from S USBP ‐ Rio  <Null> Yes No <Null> <Null>

Polyline PF Primary Operationa SHP from S USBP ‐ Rio  <Null> Yes No <Null> <Null>

Polyline PF Primary Operationa SHP from S USBP ‐ Rio  <Null> Yes No <Null> <Null>

Polyline PF Primary Operationa SHP from S USBP ‐ Rio  <Null> No No <Null> <Null>

Polyline PF Primary Operationa SHP from S USBP ‐ Rio  <Null> Yes No <Null> <Null>

Polyline PF Primary Operationa SHP from S USBP ‐ Rio  <Null> No No <Null> <Null>

Polyline PF Primary Operationa SHP from S USBP ‐ Rio  <Null> Yes No <Null> <Null>

Polyline PF Primary Operationa SHP from S USBP ‐ Rio  <Null> No No <Null> <Null>

Polyline PF Primary Operationa SHP from S USBP ‐ Rio  <Null> Yes No <Null> <Null>

Polyline PF Primary Operationa SHP from S USBP ‐ Rio  <Null> Yes No <Null> <Null>

Polyline PF Primary Operationa SHP from S USBP ‐ Rio  <Null> No No <Null> <Null>

Polyline PF Primary Operationa SHP from S USBP ‐ Rio  <Null> No No <Null> <Null>

Polyline PF Primary Operationa SHP from S USBP ‐ Rio  <Null> No No <Null> <Null>

Polyline PF Primary Operationa SHP from S USBP ‐ Rio  <Null> No No <Null> <Null>

Polyline PF Primary Operationa SHP from S USBP ‐ Rio  <Null> Yes No <Null> <Null>

Polyline PF Primary Operationa SHP from S USBP ‐ Rio  <Null> No No <Null> <Null>

BW11 FOIA CBP 003175

(b) (7)(E)

(b) (7)(E)(b) (7)(E) (b) (7)(E)

EZAISA6
Sticky Note
None set by EZAISA6
EZAISA6
Sticky Note
MigrationNone set by EZAISA6
EZAISA6
Sticky Note
Unmarked set by EZAISA6
EZAISA6
Sticky Note
None set by EZAISA6
EZAISA6
Sticky Note
MigrationNone set by EZAISA6
EZAISA6
Sticky Note
Unmarked set by EZAISA6
EZAISA6
Sticky Note
None set by EZAISA6
EZAISA6
Sticky Note
MigrationNone set by EZAISA6
EZAISA6
Sticky Note
Unmarked set by EZAISA6
EZAISA6
Sticky Note
None set by EZAISA6
EZAISA6
Sticky Note
MigrationNone set by EZAISA6
EZAISA6
Sticky Note
Unmarked set by EZAISA6
Page 140: From: To: Cc: Subject: FW: TI Presidential Transition (FINAL … · 2019-04-15 · Subject: FW: TI Presidential Transition (FINAL 2).pptx FENCE & ROADS ALCON, Please find attached

Polyline PF Primary Operationa SHP from S USBP ‐ Rio  <Null> Yes No <Null> <Null>

Polyline PF Primary Operationa SHP from S USBP ‐ Rio  <Null> No No <Null> <Null>

Polyline PF Primary Operationa SHP from S USBP ‐ Rio  <Null> Yes No <Null> <Null>

Polyline PF Primary Operationa SHP from S USBP ‐ Rio  <Null> Yes No <Null> <Null>

Polyline PF Primary Operationa SHP from S USBP ‐ Rio  <Null> Yes No <Null> <Null>

Polyline PF Primary Operationa SHP from S USBP ‐ Rio  <Null> Yes No <Null> <Null>

Polyline PF Primary Operationa SHP from S USBP ‐ Rio  <Null> No No <Null> <Null>

Polyline PF Primary Operationa SHP from S USBP ‐ Rio  <Null> Yes No <Null> <Null>

Polyline PF Primary Operationa SHP from S USBP ‐ Rio  <Null> Yes No <Null> <Null>

Polyline PF Primary Operationa SHP from S USBP ‐ Rio  <Null> No No <Null> <Null>

Polyline PF Primary Operationa SHP from S USBP ‐ Rio  <Null> Yes No <Null> <Null>

Polyline PF Primary Operationa SHP from S USBP ‐ Rio  <Null> Yes No <Null> <Null>

Polyline PF Primary Operationa SHP from S USBP ‐ Rio  <Null> No No <Null> <Null>

Polyline PF Primary Operationa SHP from S USBP ‐ Rio  <Null> No No <Null> <Null>

Polyline PF Primary Operationa SHP from S USBP ‐ Rio  <Null> Yes No <Null> <Null>

Polyline PF Primary Operationa SHP from S USBP ‐ Rio  <Null> No No <Null> <Null>

Polyline PF Primary Operationa SHP from S USBP ‐ Rio  <Null> Yes No <Null> <Null>

Polyline PF Primary Operationa SHP from S USBP ‐ Rio  <Null> No No <Null> <Null>

Polyline PF Primary Operationa SHP from S USBP ‐ Rio  <Null> Yes No <Null> <Null>

Polyline PF Primary Operationa SHP from S USBP ‐ Rio  <Null> No No <Null> <Null>

Polyline PF Primary Operationa SHP from S USBP ‐ Rio  <Null> Yes No <Null> <Null>

Polyline PF Primary Operationa SHP from S USBP ‐ Rio  <Null> No No <Null> <Null>

Polyline PF Primary Operationa SHP from S USBP ‐ Rio  <Null> Yes No <Null> <Null>

Polyline PF Primary Operationa SHP from S USBP ‐ Rio  <Null> No No <Null> <Null>

Polyline PF Primary Operationa SHP from S USBP ‐ Rio  <Null> Yes No <Null> <Null>

Polyline PF Primary Operationa ew Pr Unknown USBP ‐ Del Unknown ( Yes No <Null> <Null>

Polyline PF Primary Operationa ew Pr Unknown USBP ‐ Del Unknown ( Yes No <Null> <Null>

Polyline PF Primary Operationa ew Pr Unknown USBP ‐ Del Unknown ( Yes No <Null> <Null>

Polyline PF Primary Operationa ew Pr Unknown USBP ‐ Del Unknown ( No No <Null> <Null>

Polyline PF Primary Operationa ew Pr Unknown USBP ‐ Del Unknown ( Yes No <Null> <Null>

Polyline PF Primary Operationa ew Pr Unknown USBP ‐ Del Unknown ( Yes No <Null> <Null>

Polyline PF Primary Operationa ew Pr Unknown USBP ‐ Del Unknown ( No No <Null> <Null>

Polyline PF Primary Operationa New PrimUnknown USBP ‐ Del Unknown ( Yes No <Null> <Null>

Polyline PF Primary Operationa New PrimUnknown USBP ‐ Del Unknown ( No No <Null> <Null>

Polyline PF Primary Operationa New PrimUnknown USBP ‐ Del Unknown ( Yes No <Null> <Null>

Polyline PF Primary Operationa New Pr Unknown USBP ‐ Del Unknown ( No No <Null> <Null>

Polyline PF Primary Operationa New Pr Unknown USBP ‐ Del Unknown ( Yes No <Null> <Null>

Polyline PF Primary Operationa New Pr Unknown USBP ‐ Del Unknown ( Yes No <Null> <Null>

Polyline PF Primary Operationa New Pr Unknown USBP ‐ Del Unknown ( No No <Null> <Null>

Polyline PF Primary Operationa New Pr Unknown USBP ‐ Del Unknown ( Yes No <Null> <Null>

Polyline PF Primary Operationa New Pr Unknown USBP ‐ Del Unknown ( No No <Null> <Null>

Polyline PF Primary Operationa New Pr Unknown USBP ‐ Del Unknown ( Yes No <Null> <Null>

Polyline PF Primary Operationa New Pr Unknown USBP ‐ Del Unknown ( No No <Null> <Null>

Polyline PF Primary Operationa New Pr Unknown USBP ‐ Del Unknown ( Yes No <Null> <Null>

Polyline PF Primary Operationa New Pr Unknown USBP ‐ Del Unknown ( No No <Null> <Null>

Polyline PF Primary Operationa New Pr Unknown USBP ‐ Del Unknown ( No No <Null> <Null>

Polyline PF Primary Operationa New Pr Unknown USBP ‐ Del Unknown ( Yes No <Null> <Null>

Polyline PF Primary Operationa New Pr Unknown USBP ‐ Del Unknown ( No No <Null> <Null>

Polyline PF Primary Operationa New Pr Unknown USBP ‐ Del Unknown ( Yes No <Null> <Null>

Polyline PF Primary Operationa New Pr Unknown USBP ‐ Del Unknown ( Yes No <Null> <Null>

Polyline PF Primary Operationa New Pr Unknown USBP ‐ Del Unknown ( No No <Null> <Null>

Polyline PF Primary Operationa New Pr Unknown USBP ‐ Del Unknown ( Yes No <Null> <Null>

Polyline PF Primary Operationa New PUnknown USBP ‐ Del Unknown ( No No <Null> <Null>

Polyline PF Primary Operationa New PUnknown USBP ‐ Del Unknown ( No No <Null> <Null>

Polyline PF Primary Operationa New PUnknown USBP ‐ Del Unknown ( Yes No <Null> <Null>

Polyline PF Primary Operationa New PUnknown USBP ‐ Del Unknown ( No No <Null> <Null>

Polyline PF Primary Operationa New PUnknown USBP ‐ Del Unknown ( Yes No <Null> <Null>

Polyline PF Primary Operationa New PUnknown USBP ‐ Del Unknown ( Yes No <Null> <Null>

Polyline PF Primary Operationa New PUnknown USBP ‐ Del Unknown ( Yes No <Null> <Null>

Polyline PF Primary Operationa New PUnknown USBP ‐ Del Unknown ( Yes No <Null> <Null>

Polyline PF Primary Operationa New PUnknown USBP ‐ Del Unknown ( Yes No <Null> <Null>

Polyline PF Primary Operationa New PUnknown USBP ‐ Del Unknown ( No No <Null> <Null>

Polyline PF Primary Operationa New PUnknown USBP ‐ Del Unknown ( Yes No <Null> <Null>

Polyline PF Primary Operationa New PUnknown USBP ‐ Del Unknown ( No No <Null> <Null>

Polyline PF Primary Operationa New PUnknown USBP ‐ Del Unknown ( Yes No <Null> <Null>

Polyline PF Primary Operationa New PUnknown USBP ‐ Del Unknown ( No No <Null> <Null>

Polyline PF Primary Operationa New PUnknown USBP ‐ Del Unknown ( Yes No <Null> <Null>

Polyline PF Primary Operationa New PUnknown USBP ‐ Del Unknown ( Yes No <Null> <Null>

Polyline PF Primary Operationa New PUnknown USBP ‐ Del Unknown ( Yes No <Null> <Null>

Polyline PF Primary Operationa New PUnknown USBP ‐ Del Unknown ( Yes No <Null> <Null>

Polyline PF Primary Operationa New PUnknown USBP ‐ Del Unknown ( Yes No <Null> <Null>

BW11 FOIA CBP 003176

(b) (7)(E)

(b) (7)(E)(b) (7)(E) (b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

EZAISA6
Sticky Note
None set by EZAISA6
EZAISA6
Sticky Note
MigrationNone set by EZAISA6
EZAISA6
Sticky Note
Unmarked set by EZAISA6
EZAISA6
Sticky Note
None set by EZAISA6
EZAISA6
Sticky Note
MigrationNone set by EZAISA6
EZAISA6
Sticky Note
Unmarked set by EZAISA6
EZAISA6
Sticky Note
None set by EZAISA6
EZAISA6
Sticky Note
MigrationNone set by EZAISA6
EZAISA6
Sticky Note
Unmarked set by EZAISA6
EZAISA6
Sticky Note
None set by EZAISA6
EZAISA6
Sticky Note
MigrationNone set by EZAISA6
EZAISA6
Sticky Note
Unmarked set by EZAISA6
Page 141: From: To: Cc: Subject: FW: TI Presidential Transition (FINAL … · 2019-04-15 · Subject: FW: TI Presidential Transition (FINAL 2).pptx FENCE & ROADS ALCON, Please find attached

Polyline PF Primary Operationa New PUnknown USBP ‐ Del Unknown ( Yes No <Null> <Null>

Polyline PF Primary Operationa New PUnknown USBP ‐ Del Unknown ( Yes No <Null> <Null>

Polyline PF Primary Operationa New PUnknown USBP ‐ Del Unknown ( No No <Null> <Null>

Polyline PF Primary Operationa New PUnknown USBP ‐ Del Unknown ( No No <Null> <Null>

Polyline PF Primary Operationa New PUnknown USBP ‐ Del Unknown ( Yes No <Null> <Null>

Polyline PF Primary Operationa New PUnknown USBP ‐ Del Unknown ( No No <Null> <Null>

Polyline PF Primary Operationa New PUnknown USBP ‐ Del Unknown ( Yes No <Null> <Null>

Polyline PF Primary Operationa New PUnknown USBP ‐ Del Unknown ( No No <Null> <Null>

Polyline PF Primary Operationa New PUnknown USBP ‐ Del Unknown ( Yes No <Null> <Null>

Polyline PF Primary Operationa New PUnknown USBP ‐ Del Unknown ( Yes No <Null> <Null>

Polyline PF Primary Operationa New PUnknown USBP ‐ Del Unknown ( No No <Null> <Null>

Polyline PF Primary Operationa New PUnknown USBP ‐ Del Unknown ( Yes No <Null> <Null>

Polyline PF Primary Operationa New PUnknown USBP ‐ Del Unknown ( Yes No <Null> <Null>

Polyline PF Primary Operationa New PUnknown USBP ‐ Del Unknown ( No No <Null> <Null>

Polyline PF Primary Operationa New PUnknown USBP ‐ Del Unknown ( Yes No <Null> <Null>

Polyline PF Primary Operationa New PUnknown USBP ‐ Del Unknown ( No No <Null> <Null>

Polyline PF Primary Operationa New PUnknown USBP ‐ Del Unknown ( No No <Null> <Null>

Polyline PF Primary Operationa New PUnknown USBP ‐ Del Unknown ( No No <Null> <Null>

Polyline PF Primary Operationa New PUnknown USBP ‐ Del Unknown ( No No <Null> <Null>

Polyline PF Primary Operationa New PUnknown USBP ‐ Del Unknown ( Yes No <Null> <Null>

Polyline PF Primary Operationa New PUnknown USBP ‐ Del Unknown ( No No <Null> <Null>

Polyline PF Primary Operationa New PUnknown USBP ‐ Del Unknown ( Yes No <Null> <Null>

Polyline PF Primary Operationa New PUnknown USBP ‐ Del Unknown ( No No <Null> <Null>

Polyline PF Primary Operationa New PUnknown USBP ‐ Del Unknown ( Yes No <Null> <Null>

Polyline PF Primary Operationa New PUnknown USBP ‐ Del Unknown ( No No <Null> <Null>

Polyline PF Primary Operationa New PUnknown USBP ‐ Del Unknown ( Yes No <Null> <Null>

Polyline PF Primary Operationa New PUnknown USBP ‐ Del Unknown ( Yes No <Null> <Null>

Polyline PF Primary Operationa New Pr Unknown USBP ‐ Del Unknown ( Yes No <Null> <Null>

Polyline PF Primary Operationa New Pr Unknown USBP ‐ Del Unknown ( No No <Null> <Null>

Polyline PF Primary Operationa New Pr Unknown USBP ‐ Del Unknown ( Yes No <Null> <Null>

Polyline PF Primary Operationa New Pr Unknown USBP ‐ Del Unknown ( No No <Null> <Null>

Polyline VF Primary Operationa New VeUnknown USBP ‐ Big  Unknown ( No No <Null> <Null>

Polyline VF Primary Operationa New VeUnknown USBP ‐ Big  Unknown ( No No <Null> <Null>

Polyline Unconst. V Operationa New VeUnknown USBP ‐ Big  Unknown ( No No <Null> <Null>

Polyline PF Primary Operationa Revised pe Unknown USBP ‐ TucsUnknown ( Yes No <Null> <Null>

Polyline Unconst. PFOperationa Revised pe Unknown USBP ‐ TucsUnknown ( No No <Null> <Null>

Polyline Unconst. PFOperationa Revised pe Unknown USBP ‐ TucsUnknown ( Yes No <Null> <Null>

Polyline VF to PF VF to PF Revised pe Unknown USBP ‐ TucsUnknown ( Yes Yes <Null> Yes

Polyline Unconst. PFOperationa Revised pe Unknown USBP ‐ TucsUnknown ( Yes Yes <Null> <Null>

Polyline VF to PF VF to PF Revised pe Unknown USBP ‐ TucsUnknown ( Yes Yes <Null> Yes

Polyline Unconst. PFOperationa Revised pe Unknown USBP ‐ TucsUnknown ( Yes Yes <Null> <Null>

Polyline VF to PF VF to PF Revised pe Unknown USBP ‐ TucsUnknown ( Yes Yes <Null> Yes

Polyline Unconst. PFOperationa Revised pe Unknown USBP ‐ TucsUnknown ( Yes Yes <Null> <Null>

Polyline VF to PF VF to PF Revised pe Unknown USBP ‐ TucsUnknown ( Yes Yes <Null> Yes

Polyline Unconst. PFOperationa Revised pe Unknown USBP ‐ TucsUnknown ( Yes Yes <Null> <Null>

Polyline VF to PF VF to PF Revised pe Unknown USBP ‐ TucsUnknown ( Yes Yes <Null> Yes

Polyline Unconst. PFOperationa Revised pe Unknown USBP ‐ TucsUnknown ( Yes Yes <Null> <Null>

Polyline PF Primary Operationa SHP from S USBP ‐ Rio  <Null> No No <Null> <Null>

Polyline PF Replace Replaceme Revised pe Unknown USBP ‐ San Unknown ( Yes Yes <Null> No

Polyline PF Primary Operationa Revised pe Unknown USBP ‐ San Unknown ( Yes Yes <Null> No

Polyline PF Replace Replaceme Revised pe Unknown USBP ‐ San Unknown ( Yes Yes <Null> No

Polyline PF Primary Operationa Revised pe Unknown USBP ‐ San Unknown ( Yes Yes <Null> No

Polyline PF Replace Replaceme Revised pe Unknown USBP ‐ San Unknown ( Yes Yes <Null> No

Polyline PF Primary Operationa Revised pe Unknown USBP ‐ San Unknown ( Yes Yes <Null> No

Polyline PF Replace Replaceme Revised pe Unknown USBP ‐ San Unknown ( Yes Yes <Null> No

Polyline PF Primary Operationa Revised pe Unknown USBP ‐ San Unknown ( Yes Yes <Null> No

Polyline VF to PF VF to PF Revised pe Unknown USBP ‐ El PaUnknown ( Yes Yes <Null> Yes

Polyline VF to PF VF to PF Revised pe Unknown USBP ‐ TucsUnknown ( Yes Yes <Null> Yes

Polyline Unconst. PFOperationa Revised pe Unknown USBP ‐ TucsUnknown ( Yes Yes <Null> <Null>

Polyline PF Primary Operationa Added per  Unknown USBP ‐ San USBP ‐ Bou Yes No <Null> No

Polyline PF Replace Replaceme Added per  Unknown USBP ‐ TucsUnknown ( Yes Yes <Null> No

Polyline PF Replace Replaceme Added 1/10Unknown USBP ‐ El PaUnknown ( Yes Yes <Null> No

Polyline PF Primary Operationa O‐1 TX USBP ‐ Rio  <Null> No Yes <Null> No

Polyline PF Primary Operationa O‐1 TX USBP ‐ Rio  <Null> No Yes <Null> No

Polyline PF Primary Operationa O‐1 TX USBP ‐ Rio  <Null> No Yes <Null> No

Polyline PF Primary Operationa O‐2 TX USBP ‐ Rio  <Null> No Yes <Null> No

Polyline PF Primary Operationa O‐2 TX USBP ‐ Rio  <Null> No Yes <Null> No

Polyline PF Primary Operationa O‐2 TX USBP ‐ Rio  <Null> No Yes <Null> No

Polyline PF Primary Operationa O‐3 TX USBP ‐ Rio  <Null> No Yes <Null> No

Polyline PF Primary Operationa O‐3 TX USBP ‐ Rio  <Null> No Yes <Null> No

Polyline PF Primary Operationa New PrimUnknown USBP ‐ SwaUnknown ( No No <Null> <Null>

BW11 FOIA CBP 003177

(b) (7)(E)(b) (7)(E) (b) (7)(E)(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

Page 142: From: To: Cc: Subject: FW: TI Presidential Transition (FINAL … · 2019-04-15 · Subject: FW: TI Presidential Transition (FINAL 2).pptx FENCE & ROADS ALCON, Please find attached

Polyline PF Primary Operationa ew PrimUnknown USBP ‐ SwaUnknown ( No No <Null> <Null>

Polyline PF Primary Operationa New Pri Unknown USBP ‐ SwaUnknown ( No No <Null> <Null>

Polyline PF Primary Operationa New PUnknown USBP ‐ SwaUnknown ( No No <Null> <Null>

Polyline PF Primary Operationa New PUnknown USBP ‐ SwaUnknown ( No No <Null> <Null>

Polyline PF Primary Operationa New PUnknown USBP ‐ SwaUnknown ( No No <Null> <Null>

Polyline VF Primary Operationa New VeUnknown USBP ‐ SwaUnknown ( No No <Null> <Null>

Polyline VF Primary Operationa Revised pe Unknown USBP ‐ SwaUnknown ( No No <Null> <Null>

Polyline VF Primary Operationa New VUnknown USBP ‐ SwaUnknown ( No No <Null> <Null>

Polyline VF Primary Operationa New VUnknown USBP ‐ SwaUnknown ( No No <Null> <Null>

Polyline VF Primary Operationa New VeUnknown USBP ‐ SwaUnknown ( No No <Null> <Null>

Polyline VF Primary Operationa New VUnknown USBP ‐ SwaUnknown ( No No <Null> <Null>

Polyline VF Primary Operationa New VUnknown USBP ‐ SwaUnknown ( No No <Null> <Null>

Polyline PF Primary Operationa New PUnknown USBP ‐ SwaUnknown ( No No <Null> <Null>

Polyline PF Primary Operationa New Pr Unknown USBP ‐ SwaUnknown ( No No <Null> <Null>

Polyline PF Primary Operationa  New PUnknown USBP ‐ SwaUnknown ( No No <Null> <Null>

Polyline PF Primary Operationa New Pr Unknown USBP ‐ SwaUnknown ( No No <Null> <Null>

Polyline VF Primary Operationa  New VUnknown USBP ‐ SwaUnknown ( No No <Null> <Null>

Polyline VF Primary Operationa New VUnknown USBP ‐ SwaUnknown ( No No <Null> <Null>

Polyline VF Primary Operationa New VUnknown USBP ‐ SwaUnknown ( No No <Null> <Null>

Polyline PF Primary Operationa New PUnknown USBP ‐ SwaUnknown ( No No <Null> <Null>

Polyline PF Primary Operationa New Pr Unknown USBP ‐ SwaUnknown ( No No <Null> <Null>

Polyline PF Primary Operationa New PUnknown USBP ‐ SwaUnknown ( No No <Null> <Null>

Polyline VF Primary Operationa New VeUnknown USBP ‐ SwaUnknown ( No No <Null> <Null>

Polyline PF Primary Operationa New PUnknown USBP ‐ SwaUnknown ( No No <Null> <Null>

Polyline VF Primary Operationa New VUnknown USBP ‐ SwaUnknown ( No No <Null> <Null>

Polyline VF Primary Operationa  New Unknown USBP ‐ SwaUnknown ( No No <Null> <Null>

Polyline PF Primary Operationa New PUnknown USBP ‐ SwaUnknown ( No No <Null> <Null>

Polyline PF Primary Operationa New PUnknown USBP ‐ SwaUnknown ( No No <Null> <Null>

Polyline PF Primary Operationa New PUnknown USBP ‐ SwaUnknown ( No No <Null> <Null>

Polyline VF Primary Operationa New VUnknown USBP ‐ SwaUnknown ( No No <Null> <Null>

Polyline VF Primary Operationa New VUnknown USBP ‐ SwaUnknown ( No No <Null> <Null>

Polyline VF Primary Operationa New VUnknown USBP ‐ SwaUnknown ( No No <Null> <Null>

Polyline VF Primary Operationa New VUnknown USBP ‐ SwaUnknown ( No No <Null> <Null>

Polyline PF Primary Operationa Revised pe Unknown USBP ‐ SwaUnknown ( No No <Null> <Null>

Polyline VF Primary Operationa Revised pe Unknown USBP ‐ SwaUnknown ( No No <Null> <Null>

Polyline PF Primary Operationa Revised pe Unknown USBP ‐ SwaUnknown ( No No <Null> <Null>

Polyline VF Primary Operationa New Unknown USBP ‐ SwaUnknown ( No No <Null> <Null>

Polyline VF Primary Operationa New VUnknown USBP ‐ HouUnknown ( No No <Null> <Null>

Polyline VF Primary Operationa  New Unknown USBP ‐ SwaUnknown ( No No <Null> <Null>

BW11 FOIA CBP 003178

(b) (7)(E)

(b) (7)(E)(b) (7)(E) (b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

Page 143: From: To: Cc: Subject: FW: TI Presidential Transition (FINAL … · 2019-04-15 · Subject: FW: TI Presidential Transition (FINAL 2).pptx FENCE & ROADS ALCON, Please find attached

Sum of Length_Miles Column Labels

Row Labels Constrained + OMB Constrained ++ Grand Total

USBP ‐ Big Bend (BBT)

PF Primary

VF Primary

USBP ‐ Blaine (BLW)

PF Primary

USBP ‐ Del Rio (DRT)

PF Primary

USBP ‐ El Centro (ELC)

PF Primary

PF Secondary

Replacement

VF to PF

USBP ‐ El Paso (EPT)

PF Primary

PF Secondary

Replacement

VF to PF

USBP ‐ Havre (HVM)

PF Primary

VF Primary

USBP ‐ Houlton (HLT)

VF Primary

USBP ‐ Laredo (LRT)

PF Primary

PF Secondary

USBP ‐ Rio Grande Valley (RGV)

PF Primary

USBP ‐ San Diego (SDC)

PF Primary

PF Secondary

Replacement

USBP ‐ Spokane (SPW)

PF Primary

PF Secondary

VF Primary

USBP ‐ Swanton (SWB)

PF Primary

VF Primary

USBP ‐ Tucson (TCA)

PF Primary

PF Secondary

Replacement

VF to PF

USBP ‐ Yuma (YUM)

PF Secondary

Replacement

Grand Total

BW11 FOIA CBP 003179

(b) (7)(E)

Page 144: From: To: Cc: Subject: FW: TI Presidential Transition (FINAL … · 2019-04-15 · Subject: FW: TI Presidential Transition (FINAL 2).pptx FENCE & ROADS ALCON, Please find attached

Sum of Length_Miles Column Labels

Row Labels Constrained + OMB Constrained ++ Grand Total

PF Primary

USBP ‐ Big Bend (BBT)

USBP ‐ Blaine (BLW)

USBP ‐ Del Rio (DRT)

USBP ‐ El Centro (ELC)

USBP ‐ El Paso (EPT)

USBP ‐ Havre (HVM)

USBP ‐ Laredo (LRT)

USBP ‐ Rio Grande Valley (RGV)

USBP ‐ San Diego (SDC)

USBP ‐ Spokane (SPW)

USBP ‐ Swanton (SWB)

USBP ‐ Tucson (TCA)

VF Primary

USBP ‐ Big Bend (BBT)

USBP ‐ Havre (HVM)

USBP ‐ Houlton (HLT)

USBP ‐ Spokane (SPW)

USBP ‐ Swanton (SWB)

PF Secondary

USBP ‐ El Centro (ELC)

USBP ‐ El Paso (EPT)

USBP ‐ Laredo (LRT)

USBP ‐ San Diego (SDC)

USBP ‐ Spokane (SPW)

USBP ‐ Tucson (TCA)

USBP ‐ Yuma (YUM)

Replacement

USBP ‐ El Centro (ELC)

USBP ‐ El Paso (EPT)

USBP ‐ San Diego (SDC)

USBP ‐ Tucson (TCA)

USBP ‐ Yuma (YUM)

VF to PF

USBP ‐ El Centro (ELC)

USBP ‐ El Paso (EPT)

USBP ‐ Tucson (TCA)

Grand Total

BW11 FOIA CBP 003180

(b) (7)(E)

Page 145: From: To: Cc: Subject: FW: TI Presidential Transition (FINAL … · 2019-04-15 · Subject: FW: TI Presidential Transition (FINAL 2).pptx FENCE & ROADS ALCON, Please find attached

Metrics Program Metrics Constrained OBJECTID *Shape * Fence_ID DescriptionLat_Start

PF Primary Constrained ++ Polyline Pedestrian 

VF Primary Constrained ++ Polyline Vehicle Bar

PF Secondary Constrained ++ Polyline , N

PF Secondary Constrained ++ Polyline , N

PF Secondary Constrained ++ Polyline , N

PF Secondary Constrained ++ Polyline , N

PF Secondary Constrained ++ Polyline , N

PF Secondary Constrained ++ Polyline , N

PF Secondary Constrained ++ Polyline , A

PF Secondary Constrained ++ Polyline , A

PF Secondary Constrained ++ Polyline , A

PF Secondary Constrained ++ Polyline , A

PF Secondary Constrained ++ Polyline , A

Replacement Constrained + Polyline  (J 

Replacement Constrained + Polyline  (J 

Replacement Constrained + Polyline  (J 

Replacement Constrained + Polyline  (J 

Replacement Constrained + Polyline  (J 

Replacement Constrained + Polyline  (J 

Replacement Constrained + Polyline  (J 

Replacement Constrained + Polyline  (J 

Replacement Constrained + Polyline  (J 

Replacement Constrained + Polyline  (J 

Replacement Constrained + Polyline  (J 

Replacement Constrained + Polyline  (J 

Replacement Constrained + Polyline  (J 

Replacement Constrained + Polyline  (J 

Replacement Constrained + Polyline  (J 

Replacement Constrained + Polyline  (J 

Replacement Constrained + Polyline  (J 

Replacement Constrained + Polyline  (J 

Replacement Constrained + Polyline  (J 

Replacement Constrained + Polyline  (J 

Replacement Constrained + Polyline  (J 

Replacement Constrained + Polyline  (J 

Replacement Constrained + Polyline  (J 

Replacement Constrained + Polyline  (J 

Replacement Constrained + Polyline  (J 

Replacement Constrained + Polyline  (J 

Replacement Constrained + Polyline  (J 

Replacement Constrained + Polyline  (J 

Replacement Constrained + Polyline  (J 

Replacement Constrained + Polyline  (J 

Replacement Constrained + Polyline  (J 

PF Secondary Constrained ++ Polyline  (J 

PF Secondary Constrained ++ Polyline  (J 

BW11 FOIA CBP 003181

(b) (7)(E) (b) (7)(E)

(b) (7)(E)

(b) (7)(E)

Page 146: From: To: Cc: Subject: FW: TI Presidential Transition (FINAL … · 2019-04-15 · Subject: FW: TI Presidential Transition (FINAL 2).pptx FENCE & ROADS ALCON, Please find attached

PF Secondary Constrained ++ Polyline

PF Secondary Constrained ++ Polyline

PF Secondary Constrained ++ Polyline

PF Secondary Constrained ++ Polyline

PF Secondary Constrained ++ Polyline

PF Secondary Constrained ++ Polyline

PF Secondary Constrained ++ Polyline

PF Secondary Constrained ++ Polyline

PF Secondary Constrained ++ Polyline

PF Secondary Constrained ++ Polyline

PF Secondary Constrained ++ Polyline

PF Secondary Constrained ++ Polyline

PF Secondary Constrained ++ Polyline

PF Secondary Constrained ++ Polyline

PF Secondary Constrained ++ Polyline

PF Secondary Constrained ++ Polyline

PF Secondary Constrained ++ Polyline

PF Secondary Constrained ++ Polyline

VF to PF OMB Polyline

VF to PF OMB Polyline

VF to PF OMB Polyline

VF to PF OMB Polyline

VF to PF OMB Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained + Polyline

PF Primary Constrained + Polyline

PF Primary Constrained + Polyline

PF Primary Constrained + Polyline

PF Primary Constrained + Polyline

PF Primary Constrained + Polyline

Replacement Constrained + Polyline

Replacement Constrained + Polyline

Replacement Constrained + Polyline

Replacement Constrained + Polyline

Replacement Constrained + Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

BW11 FOIA CBP 003182

(b) (7)(E)

(b) (7)(E)

Page 147: From: To: Cc: Subject: FW: TI Presidential Transition (FINAL … · 2019-04-15 · Subject: FW: TI Presidential Transition (FINAL 2).pptx FENCE & ROADS ALCON, Please find attached

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

BW11 FOIA CBP 003183

(b) (7)(E)

(b) (7)(E)

EZAISA6
Sticky Note
None set by EZAISA6
EZAISA6
Sticky Note
MigrationNone set by EZAISA6
EZAISA6
Sticky Note
Unmarked set by EZAISA6
EZAISA6
Sticky Note
None set by EZAISA6
EZAISA6
Sticky Note
MigrationNone set by EZAISA6
EZAISA6
Sticky Note
Unmarked set by EZAISA6
Page 148: From: To: Cc: Subject: FW: TI Presidential Transition (FINAL … · 2019-04-15 · Subject: FW: TI Presidential Transition (FINAL 2).pptx FENCE & ROADS ALCON, Please find attached

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

BW11 FOIA CBP 003184

(b) (7)(E)

(b) (7)(E)

EZAISA6
Sticky Note
None set by EZAISA6
EZAISA6
Sticky Note
MigrationNone set by EZAISA6
EZAISA6
Sticky Note
Unmarked set by EZAISA6
EZAISA6
Sticky Note
None set by EZAISA6
EZAISA6
Sticky Note
MigrationNone set by EZAISA6
EZAISA6
Sticky Note
Unmarked set by EZAISA6
Page 149: From: To: Cc: Subject: FW: TI Presidential Transition (FINAL … · 2019-04-15 · Subject: FW: TI Presidential Transition (FINAL 2).pptx FENCE & ROADS ALCON, Please find attached

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

BW11 FOIA CBP 003185

(b) (7)(E)

(b) (7)(E)

EZAISA6
Sticky Note
None set by EZAISA6
EZAISA6
Sticky Note
MigrationNone set by EZAISA6
EZAISA6
Sticky Note
Unmarked set by EZAISA6
EZAISA6
Sticky Note
None set by EZAISA6
EZAISA6
Sticky Note
MigrationNone set by EZAISA6
EZAISA6
Sticky Note
Unmarked set by EZAISA6
Page 150: From: To: Cc: Subject: FW: TI Presidential Transition (FINAL … · 2019-04-15 · Subject: FW: TI Presidential Transition (FINAL 2).pptx FENCE & ROADS ALCON, Please find attached

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

BW11 FOIA CBP 003186

(b) (7)(E)

(b) (7)(E)

EZAISA6
Sticky Note
None set by EZAISA6
EZAISA6
Sticky Note
MigrationNone set by EZAISA6
EZAISA6
Sticky Note
Unmarked set by EZAISA6
EZAISA6
Sticky Note
None set by EZAISA6
EZAISA6
Sticky Note
MigrationNone set by EZAISA6
EZAISA6
Sticky Note
Unmarked set by EZAISA6
Page 151: From: To: Cc: Subject: FW: TI Presidential Transition (FINAL … · 2019-04-15 · Subject: FW: TI Presidential Transition (FINAL 2).pptx FENCE & ROADS ALCON, Please find attached

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained + Polyline

BW11 FOIA CBP 003187

(b) (7)(E)

(b) (7)(E)

EZAISA6
Sticky Note
None set by EZAISA6
EZAISA6
Sticky Note
MigrationNone set by EZAISA6
EZAISA6
Sticky Note
Unmarked set by EZAISA6
EZAISA6
Sticky Note
None set by EZAISA6
EZAISA6
Sticky Note
MigrationNone set by EZAISA6
EZAISA6
Sticky Note
Unmarked set by EZAISA6
Page 152: From: To: Cc: Subject: FW: TI Presidential Transition (FINAL … · 2019-04-15 · Subject: FW: TI Presidential Transition (FINAL 2).pptx FENCE & ROADS ALCON, Please find attached

PF Primary Constrained + Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

VF to PF OMB Polyline

VF to PF OMB Polyline

VF to PF OMB Polyline

VF to PF OMB Polyline

VF to PF OMB Polyline

VF to PF OMB Polyline

VF to PF OMB Polyline

VF to PF OMB Polyline

VF to PF OMB Polyline

VF to PF OMB Polyline

VF to PF OMB Polyline

VF to PF OMB Polyline

VF to PF OMB Polyline

VF to PF OMB Polyline

VF to PF OMB Polyline

VF to PF OMB Polyline

VF to PF OMB Polyline

VF to PF OMB Polyline

VF to PF OMB Polyline

VF to PF OMB Polyline

VF to PF OMB Polyline

PF Secondary Constrained ++ Polyline

PF Secondary Constrained ++ Polyline

PF Secondary Constrained ++ Polyline

PF Secondary Constrained ++ Polyline

PF Secondary Constrained ++ Polyline

PF Secondary Constrained ++ Polyline

PF Secondary Constrained ++ Polyline

PF Secondary Constrained ++ Polyline

PF Secondary Constrained ++ Polyline

PF Secondary Constrained ++ Polyline

PF Secondary Constrained ++ Polyline

PF Secondary Constrained ++ Polyline

PF Secondary Constrained ++ Polyline

PF Secondary Constrained ++ Polyline

PF Secondary Constrained ++ Polyline

PF Secondary Constrained ++ Polyline

PF Secondary Constrained ++ Polyline

PF Secondary Constrained ++ Polyline

PF Secondary Constrained ++ Polyline

BW11 FOIA CBP 003188

(b) (7)(E)

(b) (7)(E)

EZAISA6
Sticky Note
None set by EZAISA6
EZAISA6
Sticky Note
MigrationNone set by EZAISA6
EZAISA6
Sticky Note
Unmarked set by EZAISA6
EZAISA6
Sticky Note
None set by EZAISA6
EZAISA6
Sticky Note
MigrationNone set by EZAISA6
EZAISA6
Sticky Note
Unmarked set by EZAISA6
Page 153: From: To: Cc: Subject: FW: TI Presidential Transition (FINAL … · 2019-04-15 · Subject: FW: TI Presidential Transition (FINAL 2).pptx FENCE & ROADS ALCON, Please find attached

PF Secondary Constrained ++ Polyline

PF Secondary Constrained ++ Polyline

PF Secondary Constrained ++ Polyline

PF Secondary Constrained ++ Polyline

PF Secondary Constrained ++ Polyline

PF Secondary Constrained ++ Polyline

PF Secondary Constrained ++ Polyline

PF Secondary Constrained ++ Polyline

PF Secondary Constrained ++ Polyline

PF Secondary Constrained ++ Polyline

PF Secondary Constrained ++ Polyline

PF Secondary Constrained ++ Polyline

PF Secondary Constrained ++ Polyline

PF Secondary Constrained ++ Polyline

PF Secondary Constrained ++ Polyline

PF Secondary Constrained ++ Polyline

PF Secondary Constrained ++ Polyline

PF Secondary Constrained ++ Polyline

PF Secondary Constrained ++ Polyline

PF Secondary Constrained ++ Polyline

PF Secondary Constrained ++ Polyline

PF Secondary Constrained ++ Polyline

PF Secondary Constrained ++ Polyline

PF Secondary Constrained ++ Polyline

PF Secondary Constrained ++ Polyline

PF Secondary Constrained ++ Polyline

PF Secondary Constrained ++ Polyline

PF Secondary Constrained ++ Polyline

PF Secondary Constrained ++ Polyline

PF Secondary Constrained ++ Polyline

PF Secondary Constrained ++ Polyline

PF Secondary Constrained ++ Polyline

PF Secondary Constrained ++ Polyline

PF Secondary Constrained ++ Polyline

PF Secondary Constrained ++ Polyline

PF Secondary Constrained ++ Polyline

PF Secondary Constrained ++ Polyline

PF Secondary Constrained ++ Polyline

PF Secondary Constrained ++ Polyline

PF Secondary Constrained ++ Polyline

PF Secondary Constrained ++ Polyline

PF Secondary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

BW11 FOIA CBP 003189

(b) (7)(E)

(b) (7)(E)

EZAISA6
Sticky Note
None set by EZAISA6
EZAISA6
Sticky Note
MigrationNone set by EZAISA6
EZAISA6
Sticky Note
Unmarked set by EZAISA6
EZAISA6
Sticky Note
None set by EZAISA6
EZAISA6
Sticky Note
MigrationNone set by EZAISA6
EZAISA6
Sticky Note
Unmarked set by EZAISA6
Page 154: From: To: Cc: Subject: FW: TI Presidential Transition (FINAL … · 2019-04-15 · Subject: FW: TI Presidential Transition (FINAL 2).pptx FENCE & ROADS ALCON, Please find attached

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Secondary Constrained ++ Polyline

PF Secondary Constrained ++ Polyline

PF Secondary Constrained ++ Polyline

PF Secondary Constrained ++ Polyline

PF Secondary Constrained ++ Polyline

PF Secondary Constrained ++ Polyline

PF Secondary Constrained ++ Polyline

PF Secondary Constrained ++ Polyline

PF Secondary Constrained ++ Polyline

PF Secondary Constrained ++ Polyline

PF Secondary Constrained ++ Polyline

PF Secondary Constrained ++ Polyline

PF Secondary Constrained ++ Polyline

PF Secondary Constrained ++ Polyline

PF Secondary Constrained ++ Polyline

PF Secondary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

BW11 FOIA CBP 003190

(b) (7)(E)

(b) (7)(E)

EZAISA6
Sticky Note
None set by EZAISA6
EZAISA6
Sticky Note
MigrationNone set by EZAISA6
EZAISA6
Sticky Note
Unmarked set by EZAISA6
EZAISA6
Sticky Note
None set by EZAISA6
EZAISA6
Sticky Note
MigrationNone set by EZAISA6
EZAISA6
Sticky Note
Unmarked set by EZAISA6
Page 155: From: To: Cc: Subject: FW: TI Presidential Transition (FINAL … · 2019-04-15 · Subject: FW: TI Presidential Transition (FINAL 2).pptx FENCE & ROADS ALCON, Please find attached

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

Replacement OMB Polyline

Replacement Constrained + Polyline

VF to PF OMB Polyline

VF to PF OMB Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

VF to PF OMB Polyline

VF to PF OMB Polyline

VF to PF OMB Polyline

VF to PF OMB Polyline

VF to PF OMB Polyline

VF to PF OMB Polyline

VF to PF OMB Polyline

VF to PF OMB Polyline

VF to PF OMB Polyline

Replacement Constrained + Polyline

BW11 FOIA CBP 003191

(b) (7)(E)

(b) (7)(E)

EZAISA6
Sticky Note
None set by EZAISA6
EZAISA6
Sticky Note
MigrationNone set by EZAISA6
EZAISA6
Sticky Note
Unmarked set by EZAISA6
EZAISA6
Sticky Note
None set by EZAISA6
EZAISA6
Sticky Note
MigrationNone set by EZAISA6
EZAISA6
Sticky Note
Unmarked set by EZAISA6
Page 156: From: To: Cc: Subject: FW: TI Presidential Transition (FINAL … · 2019-04-15 · Subject: FW: TI Presidential Transition (FINAL 2).pptx FENCE & ROADS ALCON, Please find attached

Replacement Constrained + Polyline

Replacement Constrained + Polyline

Replacement Constrained + Polyline

Replacement OMB Polyline

Replacement OMB Polyline

Replacement OMB Polyline

Replacement Constrained + Polyline

Replacement Constrained + Polyline

Replacement Constrained + Polyline

Replacement Constrained + Polyline

Replacement OMB Polyline

Replacement OMB Polyline

Replacement OMB Polyline

Replacement OMB Polyline

Replacement OMB Polyline

Replacement Constrained + Polyline

Replacement Constrained + Polyline

Replacement Constrained + Polyline

PF Secondary Constrained ++ Polyline

PF Secondary Constrained ++ Polyline

PF Secondary Constrained ++ Polyline

PF Secondary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

VF Primary Constrained ++ Polyline

VF Primary Constrained ++ Polyline

VF Primary Constrained ++ Polyline

VF Primary Constrained ++ Polyline

VF Primary Constrained ++ Polyline

VF Primary Constrained ++ Polyline

VF Primary Constrained ++ Polyline

VF Primary Constrained ++ Polyline

VF Primary Constrained ++ Polyline

VF Primary Constrained ++ Polyline

VF Primary Constrained ++ Polyline

VF Primary Constrained ++ Polyline

VF Primary Constrained ++ Polyline

VF Primary Constrained ++ Polyline

VF Primary Constrained ++ Polyline

VF Primary Constrained ++ Polyline

VF Primary Constrained ++ Polyline

VF Primary Constrained ++ Polyline

VF Primary Constrained ++ Polyline

VF Primary Constrained ++ Polyline

VF Primary Constrained ++ Polyline

VF Primary Constrained ++ Polyline

BW11 FOIA CBP 003192

(b) (7)(E)

(b) (7)(E)

EZAISA6
Sticky Note
None set by EZAISA6
EZAISA6
Sticky Note
MigrationNone set by EZAISA6
EZAISA6
Sticky Note
Unmarked set by EZAISA6
EZAISA6
Sticky Note
None set by EZAISA6
EZAISA6
Sticky Note
MigrationNone set by EZAISA6
EZAISA6
Sticky Note
Unmarked set by EZAISA6
Page 157: From: To: Cc: Subject: FW: TI Presidential Transition (FINAL … · 2019-04-15 · Subject: FW: TI Presidential Transition (FINAL 2).pptx FENCE & ROADS ALCON, Please find attached

VF Primary Constrained ++ Polyline

VF Primary Constrained ++ Polyline

VF Primary Constrained ++ Polyline

VF Primary Constrained ++ Polyline

VF Primary Constrained ++ Polyline

VF Primary Constrained ++ Polyline

VF Primary Constrained ++ Polyline

VF Primary Constrained ++ Polyline

VF Primary Constrained ++ Polyline

VF Primary Constrained ++ Polyline

VF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

VF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

VF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

VF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

VF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

VF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

VF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

VF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

VF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

VF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

VF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

VF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

VF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

VF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

VF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

VF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

VF Primary Constrained ++ Polyline

BW11 FOIA CBP 003193

(b) (7)(E)

(b) (7)(E)

EZAISA6
Sticky Note
None set by EZAISA6
EZAISA6
Sticky Note
MigrationNone set by EZAISA6
EZAISA6
Sticky Note
Unmarked set by EZAISA6
EZAISA6
Sticky Note
None set by EZAISA6
EZAISA6
Sticky Note
MigrationNone set by EZAISA6
EZAISA6
Sticky Note
Unmarked set by EZAISA6
Page 158: From: To: Cc: Subject: FW: TI Presidential Transition (FINAL … · 2019-04-15 · Subject: FW: TI Presidential Transition (FINAL 2).pptx FENCE & ROADS ALCON, Please find attached

PF Primary Constrained ++ Polyline

VF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

VF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

VF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

VF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Secondary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Secondary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

VF Primary Constrained ++ Polyline

VF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

VF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

VF Primary Constrained ++ Polyline

VF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

VF Primary Constrained ++ Polyline

VF to PF OMB Polyline

VF to PF OMB Polyline

VF to PF OMB Polyline

VF to PF OMB Polyline

BW11 FOIA CBP 003194

(b) (7)(E)

(b) (7)(E)

EZAISA6
Sticky Note
None set by EZAISA6
EZAISA6
Sticky Note
MigrationNone set by EZAISA6
EZAISA6
Sticky Note
Unmarked set by EZAISA6
EZAISA6
Sticky Note
None set by EZAISA6
EZAISA6
Sticky Note
MigrationNone set by EZAISA6
EZAISA6
Sticky Note
Unmarked set by EZAISA6
Page 159: From: To: Cc: Subject: FW: TI Presidential Transition (FINAL … · 2019-04-15 · Subject: FW: TI Presidential Transition (FINAL 2).pptx FENCE & ROADS ALCON, Please find attached

VF to PF OMB Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

VF to PF OMB Polyline

VF to PF OMB Polyline

VF to PF OMB Polyline

PF Primary Constrained ++ Polyline

VF to PF OMB Polyline

VF to PF OMB Polyline

VF to PF OMB Polyline

VF to PF OMB Polyline

VF to PF OMB Polyline

PF Primary Constrained ++ Polyline

VF to PF OMB Polyline

VF to PF OMB Polyline

PF Primary Constrained ++ Polyline

VF to PF OMB Polyline

VF to PF OMB Polyline

PF Primary Constrained ++ Polyline

VF to PF OMB Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

VF to PF OMB Polyline

VF to PF OMB Polyline

VF to PF OMB Polyline

VF to PF OMB Polyline

VF to PF OMB Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

VF to PF OMB Polyline

VF to PF OMB Polyline

VF to PF OMB Polyline

VF to PF OMB Polyline

VF to PF OMB Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

VF to PF OMB Polyline

VF to PF OMB Polyline

VF to PF OMB Polyline

VF to PF OMB Polyline

VF to PF OMB Polyline

Replacement OMB Polyline

BW11 FOIA CBP 003195

(b) (7)(E)

(b) (7)(E)

EZAISA6
Sticky Note
None set by EZAISA6
EZAISA6
Sticky Note
MigrationNone set by EZAISA6
EZAISA6
Sticky Note
Unmarked set by EZAISA6
EZAISA6
Sticky Note
None set by EZAISA6
EZAISA6
Sticky Note
MigrationNone set by EZAISA6
EZAISA6
Sticky Note
Unmarked set by EZAISA6
Page 160: From: To: Cc: Subject: FW: TI Presidential Transition (FINAL … · 2019-04-15 · Subject: FW: TI Presidential Transition (FINAL 2).pptx FENCE & ROADS ALCON, Please find attached

Replacement OMB Polyline

Replacement OMB Polyline

PF Primary Constrained ++ Polyline

VF Primary Constrained ++ Polyline

VF Primary Constrained ++ Polyline

VF Primary Constrained ++ Polyline

VF Primary Constrained ++ Polyline

VF Primary Constrained ++ Polyline

VF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

VF to PF OMB Polyline

Replacement Constrained + Polyline

Replacement Constrained + Polyline

Replacement Constrained + Polyline

Replacement Constrained + Polyline

Replacement Constrained + Polyline

Replacement Constrained + Polyline

Replacement Constrained + Polyline

Replacement Constrained + Polyline

Replacement Constrained + Polyline

Replacement Constrained + Polyline

Replacement Constrained + Polyline

Replacement Constrained + Polyline

Replacement Constrained + Polyline

Replacement Constrained + Polyline

Replacement Constrained + Polyline

Replacement Constrained + Polyline

Replacement Constrained + Polyline

Replacement Constrained + Polyline

Replacement Constrained + Polyline

Replacement Constrained + Polyline

Replacement Constrained + Polyline

Replacement Constrained + Polyline

Replacement Constrained + Polyline

Replacement Constrained + Polyline

Replacement Constrained + Polyline

Replacement Constrained + Polyline

Replacement Constrained + Polyline

Replacement Constrained + Polyline

Replacement Constrained + Polyline

Replacement Constrained + Polyline

Replacement Constrained + Polyline

Replacement Constrained + Polyline

Replacement Constrained + Polyline

Replacement Constrained + Polyline

Replacement Constrained + Polyline

Replacement Constrained + Polyline

BW11 FOIA CBP 003196

(b) (7)(E)

(b) (7)(E)

EZAISA6
Sticky Note
None set by EZAISA6
EZAISA6
Sticky Note
MigrationNone set by EZAISA6
EZAISA6
Sticky Note
Unmarked set by EZAISA6
EZAISA6
Sticky Note
None set by EZAISA6
EZAISA6
Sticky Note
MigrationNone set by EZAISA6
EZAISA6
Sticky Note
Unmarked set by EZAISA6
Page 161: From: To: Cc: Subject: FW: TI Presidential Transition (FINAL … · 2019-04-15 · Subject: FW: TI Presidential Transition (FINAL 2).pptx FENCE & ROADS ALCON, Please find attached

Replacement Constrained + Polyline

Replacement Constrained + Polyline

Replacement Constrained + Polyline

PF Primary Constrained + Polyline

PF Primary Constrained + Polyline

PF Primary Constrained + Polyline

PF Primary Constrained + Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

Replacement Constrained + Polyline

Replacement Constrained + Polyline

Replacement Constrained + Polyline

Replacement Constrained + Polyline

PF Primary Constrained + Polyline

Replacement Constrained + Polyline

PF Secondary Constrained ++ Polyline

PF Secondary Constrained ++ Polyline

PF Secondary Constrained ++ Polyline

PF Secondary Constrained ++ Polyline

PF Secondary Constrained ++ Polyline

PF Secondary Constrained ++ Polyline

PF Secondary Constrained ++ Polyline

PF Secondary Constrained ++ Polyline

PF Primary Constrained + Polyline

PF Primary Constrained + Polyline

PF Primary Constrained + Polyline

PF Secondary Constrained ++ Polyline

Replacement Constrained + Polyline

PF Primary Constrained + Polyline

Replacement Constrained + Polyline

PF Primary Constrained + Polyline

Replacement Constrained + Polyline

PF Primary Constrained + Polyline

Replacement Constrained + Polyline

Replacement Constrained + Polyline

Replacement Constrained + Polyline

Replacement Constrained + Polyline

PF Primary Constrained + Polyline

Replacement Constrained + Polyline

Replacement Constrained + Polyline

Replacement Constrained + Polyline

Replacement Constrained + Polyline

PF Primary Constrained + Polyline

PF Primary Constrained + Polyline

Replacement Constrained + Polyline

Replacement Constrained + Polyline

BW11 FOIA CBP 003197

(b) (7)(E)

(b) (7)(E)

EZAISA6
Sticky Note
None set by EZAISA6
EZAISA6
Sticky Note
MigrationNone set by EZAISA6
EZAISA6
Sticky Note
Unmarked set by EZAISA6
EZAISA6
Sticky Note
None set by EZAISA6
EZAISA6
Sticky Note
MigrationNone set by EZAISA6
EZAISA6
Sticky Note
Unmarked set by EZAISA6
Page 162: From: To: Cc: Subject: FW: TI Presidential Transition (FINAL … · 2019-04-15 · Subject: FW: TI Presidential Transition (FINAL 2).pptx FENCE & ROADS ALCON, Please find attached

PF Primary Constrained + Polyline

Replacement Constrained + Polyline

PF Primary Constrained + Polyline

PF Primary Constrained + Polyline

PF Secondary Constrained ++ Polyline

PF Secondary Constrained ++ Polyline

PF Secondary Constrained ++ Polyline

PF Secondary Constrained ++ Polyline

PF Secondary Constrained ++ Polyline

PF Secondary Constrained ++ Polyline

PF Secondary Constrained ++ Polyline

PF Secondary Constrained ++ Polyline

PF Secondary Constrained ++ Polyline

PF Secondary Constrained ++ Polyline

PF Secondary Constrained ++ Polyline

PF Secondary Constrained ++ Polyline

PF Secondary Constrained ++ Polyline

PF Secondary Constrained ++ Polyline

PF Secondary Constrained ++ Polyline

PF Secondary Constrained ++ Polyline

PF Secondary Constrained ++ Polyline

PF Secondary Constrained ++ Polyline

PF Secondary Constrained ++ Polyline

Replacement Constrained + Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

BW11 FOIA CBP 003198

(b) (7)(E)

(b) (7)(E)

EZAISA6
Sticky Note
None set by EZAISA6
EZAISA6
Sticky Note
MigrationNone set by EZAISA6
EZAISA6
Sticky Note
Unmarked set by EZAISA6
EZAISA6
Sticky Note
None set by EZAISA6
EZAISA6
Sticky Note
MigrationNone set by EZAISA6
EZAISA6
Sticky Note
Unmarked set by EZAISA6
Page 163: From: To: Cc: Subject: FW: TI Presidential Transition (FINAL … · 2019-04-15 · Subject: FW: TI Presidential Transition (FINAL 2).pptx FENCE & ROADS ALCON, Please find attached

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

BW11 FOIA CBP 003199

(b) (7)(E)

(b) (7)(E)

EZAISA6
Sticky Note
None set by EZAISA6
EZAISA6
Sticky Note
MigrationNone set by EZAISA6
EZAISA6
Sticky Note
Unmarked set by EZAISA6
EZAISA6
Sticky Note
None set by EZAISA6
EZAISA6
Sticky Note
MigrationNone set by EZAISA6
EZAISA6
Sticky Note
Unmarked set by EZAISA6
Page 164: From: To: Cc: Subject: FW: TI Presidential Transition (FINAL … · 2019-04-15 · Subject: FW: TI Presidential Transition (FINAL 2).pptx FENCE & ROADS ALCON, Please find attached

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

BW11 FOIA CBP 003200

(b) (7)(E)

(b) (7)(E)

EZAISA6
Sticky Note
None set by EZAISA6
EZAISA6
Sticky Note
MigrationNone set by EZAISA6
EZAISA6
Sticky Note
Unmarked set by EZAISA6
EZAISA6
Sticky Note
None set by EZAISA6
EZAISA6
Sticky Note
MigrationNone set by EZAISA6
EZAISA6
Sticky Note
Unmarked set by EZAISA6
Page 165: From: To: Cc: Subject: FW: TI Presidential Transition (FINAL … · 2019-04-15 · Subject: FW: TI Presidential Transition (FINAL 2).pptx FENCE & ROADS ALCON, Please find attached

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

BW11 FOIA CBP 003201

(b) (7)(E)

(b) (7)(E)

EZAISA6
Sticky Note
None set by EZAISA6
EZAISA6
Sticky Note
MigrationNone set by EZAISA6
EZAISA6
Sticky Note
Unmarked set by EZAISA6
EZAISA6
Sticky Note
None set by EZAISA6
EZAISA6
Sticky Note
MigrationNone set by EZAISA6
EZAISA6
Sticky Note
Unmarked set by EZAISA6
Page 166: From: To: Cc: Subject: FW: TI Presidential Transition (FINAL … · 2019-04-15 · Subject: FW: TI Presidential Transition (FINAL 2).pptx FENCE & ROADS ALCON, Please find attached

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

BW11 FOIA CBP 003202

(b) (7)(E)

(b) (7)(E)

EZAISA6
Sticky Note
None set by EZAISA6
EZAISA6
Sticky Note
MigrationNone set by EZAISA6
EZAISA6
Sticky Note
Unmarked set by EZAISA6
EZAISA6
Sticky Note
None set by EZAISA6
EZAISA6
Sticky Note
MigrationNone set by EZAISA6
EZAISA6
Sticky Note
Unmarked set by EZAISA6
Page 167: From: To: Cc: Subject: FW: TI Presidential Transition (FINAL … · 2019-04-15 · Subject: FW: TI Presidential Transition (FINAL 2).pptx FENCE & ROADS ALCON, Please find attached

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

BW11 FOIA CBP 003203

(b) (7)(E)

(b) (7)(E)

EZAISA6
Sticky Note
None set by EZAISA6
EZAISA6
Sticky Note
MigrationNone set by EZAISA6
EZAISA6
Sticky Note
Unmarked set by EZAISA6
EZAISA6
Sticky Note
None set by EZAISA6
EZAISA6
Sticky Note
MigrationNone set by EZAISA6
EZAISA6
Sticky Note
Unmarked set by EZAISA6
Page 168: From: To: Cc: Subject: FW: TI Presidential Transition (FINAL … · 2019-04-15 · Subject: FW: TI Presidential Transition (FINAL 2).pptx FENCE & ROADS ALCON, Please find attached

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

BW11 FOIA CBP 003204

(b) (7)(E)

(b) (7)(E)

EZAISA6
Sticky Note
None set by EZAISA6
EZAISA6
Sticky Note
MigrationNone set by EZAISA6
EZAISA6
Sticky Note
Unmarked set by EZAISA6
EZAISA6
Sticky Note
None set by EZAISA6
EZAISA6
Sticky Note
MigrationNone set by EZAISA6
EZAISA6
Sticky Note
Unmarked set by EZAISA6
Page 169: From: To: Cc: Subject: FW: TI Presidential Transition (FINAL … · 2019-04-15 · Subject: FW: TI Presidential Transition (FINAL 2).pptx FENCE & ROADS ALCON, Please find attached

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

VF Primary Constrained ++ Polyline

VF Primary Constrained ++ Polyline

VF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

VF to PF OMB Polyline

PF Primary Constrained ++ Polyline

BW11 FOIA CBP 003205

(b) (7)(E)

(b) (7)(E)

EZAISA6
Sticky Note
None set by EZAISA6
EZAISA6
Sticky Note
MigrationNone set by EZAISA6
EZAISA6
Sticky Note
Unmarked set by EZAISA6
EZAISA6
Sticky Note
None set by EZAISA6
EZAISA6
Sticky Note
MigrationNone set by EZAISA6
EZAISA6
Sticky Note
Unmarked set by EZAISA6
Page 170: From: To: Cc: Subject: FW: TI Presidential Transition (FINAL … · 2019-04-15 · Subject: FW: TI Presidential Transition (FINAL 2).pptx FENCE & ROADS ALCON, Please find attached

VF to PF OMB Polyline

PF Primary Constrained ++ Polyline

VF to PF OMB Polyline

PF Primary Constrained ++ Polyline

VF to PF OMB Polyline

PF Primary Constrained ++ Polyline

VF to PF OMB Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

Replacement Constrained + Polyline

PF Primary Constrained + Polyline

Replacement Constrained + Polyline

PF Primary Constrained + Polyline

Replacement Constrained + Polyline

PF Primary Constrained + Polyline

Replacement Constrained + Polyline

PF Primary Constrained + Polyline

VF to PF OMB Polyline

VF to PF OMB Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained + Polyline

Replacement Constrained + Polyline

Replacement Constrained + Polyline

PF Primary Constrained + Polyline

PF Primary Constrained + Polyline

PF Primary Constrained + Polyline

PF Primary Constrained + Polyline

PF Primary Constrained + Polyline

PF Primary Constrained + Polyline

PF Primary Constrained + Polyline

PF Primary Constrained + Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

VF Primary Constrained ++ Polyline

VF Primary Constrained ++ Polyline

VF Primary Constrained ++ Polyline

VF Primary Constrained ++ Polyline

VF Primary Constrained ++ Polyline

VF Primary Constrained ++ Polyline

VF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

BW11 FOIA CBP 003206

(b) (7)(E)

(b) (7)(E)

EZAISA6
Sticky Note
None set by EZAISA6
EZAISA6
Sticky Note
MigrationNone set by EZAISA6
EZAISA6
Sticky Note
Unmarked set by EZAISA6
EZAISA6
Sticky Note
None set by EZAISA6
EZAISA6
Sticky Note
MigrationNone set by EZAISA6
EZAISA6
Sticky Note
Unmarked set by EZAISA6
Page 171: From: To: Cc: Subject: FW: TI Presidential Transition (FINAL … · 2019-04-15 · Subject: FW: TI Presidential Transition (FINAL 2).pptx FENCE & ROADS ALCON, Please find attached

PF Primary Constrained ++ Polyline

VF Primary Constrained ++ Polyline

VF Primary Constrained ++ Polyline

VF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

VF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

VF Primary Constrained ++ Polyline

VF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

VF Primary Constrained ++ Polyline

VF Primary Constrained ++ Polyline

VF Primary Constrained ++ Polyline

VF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

VF Primary Constrained ++ Polyline

PF Primary Constrained ++ Polyline

VF Primary Constrained ++ Polyline

VF Primary Constrained ++ Polyline

VF Primary Constrained ++ Polyline

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

BW11 FOIA CBP 003207

(b) (7)(E)

(b) (7)(E)

Page 172: From: To: Cc: Subject: FW: TI Presidential Transition (FINAL … · 2019-04-15 · Subject: FW: TI Presidential Transition (FINAL 2).pptx FENCE & ROADS ALCON, Please find attached

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

BW11 FOIA CBP 003208

Page 173: From: To: Cc: Subject: FW: TI Presidential Transition (FINAL … · 2019-04-15 · Subject: FW: TI Presidential Transition (FINAL 2).pptx FENCE & ROADS ALCON, Please find attached

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

BW11 FOIA CBP 003209

Page 174: From: To: Cc: Subject: FW: TI Presidential Transition (FINAL … · 2019-04-15 · Subject: FW: TI Presidential Transition (FINAL 2).pptx FENCE & ROADS ALCON, Please find attached

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

BW11 FOIA CBP 003210

Page 175: From: To: Cc: Subject: FW: TI Presidential Transition (FINAL … · 2019-04-15 · Subject: FW: TI Presidential Transition (FINAL 2).pptx FENCE & ROADS ALCON, Please find attached

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

BW11 FOIA CBP 003211

Page 176: From: To: Cc: Subject: FW: TI Presidential Transition (FINAL … · 2019-04-15 · Subject: FW: TI Presidential Transition (FINAL 2).pptx FENCE & ROADS ALCON, Please find attached

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

BW11 FOIA CBP 003212

Page 177: From: To: Cc: Subject: FW: TI Presidential Transition (FINAL … · 2019-04-15 · Subject: FW: TI Presidential Transition (FINAL 2).pptx FENCE & ROADS ALCON, Please find attached

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

BW11 FOIA CBP 003213

Page 178: From: To: Cc: Subject: FW: TI Presidential Transition (FINAL … · 2019-04-15 · Subject: FW: TI Presidential Transition (FINAL 2).pptx FENCE & ROADS ALCON, Please find attached

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

BW11 FOIA CBP 003214

Page 179: From: To: Cc: Subject: FW: TI Presidential Transition (FINAL … · 2019-04-15 · Subject: FW: TI Presidential Transition (FINAL 2).pptx FENCE & ROADS ALCON, Please find attached

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

BW11 FOIA CBP 003215

Page 180: From: To: Cc: Subject: FW: TI Presidential Transition (FINAL … · 2019-04-15 · Subject: FW: TI Presidential Transition (FINAL 2).pptx FENCE & ROADS ALCON, Please find attached

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

BW11 FOIA CBP 003216

Page 181: From: To: Cc: Subject: FW: TI Presidential Transition (FINAL … · 2019-04-15 · Subject: FW: TI Presidential Transition (FINAL 2).pptx FENCE & ROADS ALCON, Please find attached

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

BW11 FOIA CBP 003217

Page 182: From: To: Cc: Subject: FW: TI Presidential Transition (FINAL … · 2019-04-15 · Subject: FW: TI Presidential Transition (FINAL 2).pptx FENCE & ROADS ALCON, Please find attached

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

BW11 FOIA CBP 003218

Page 183: From: To: Cc: Subject: FW: TI Presidential Transition (FINAL … · 2019-04-15 · Subject: FW: TI Presidential Transition (FINAL 2).pptx FENCE & ROADS ALCON, Please find attached

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

BW11 FOIA CBP 003219

Page 184: From: To: Cc: Subject: FW: TI Presidential Transition (FINAL … · 2019-04-15 · Subject: FW: TI Presidential Transition (FINAL 2).pptx FENCE & ROADS ALCON, Please find attached

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

BW11 FOIA CBP 003220

Page 185: From: To: Cc: Subject: FW: TI Presidential Transition (FINAL … · 2019-04-15 · Subject: FW: TI Presidential Transition (FINAL 2).pptx FENCE & ROADS ALCON, Please find attached

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

BW11 FOIA CBP 003221

Page 186: From: To: Cc: Subject: FW: TI Presidential Transition (FINAL … · 2019-04-15 · Subject: FW: TI Presidential Transition (FINAL 2).pptx FENCE & ROADS ALCON, Please find attached

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

BW11 FOIA CBP 003222

Page 187: From: To: Cc: Subject: FW: TI Presidential Transition (FINAL … · 2019-04-15 · Subject: FW: TI Presidential Transition (FINAL 2).pptx FENCE & ROADS ALCON, Please find attached

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

BW11 FOIA CBP 003223

Page 188: From: To: Cc: Subject: FW: TI Presidential Transition (FINAL … · 2019-04-15 · Subject: FW: TI Presidential Transition (FINAL 2).pptx FENCE & ROADS ALCON, Please find attached

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

BW11 FOIA CBP 003224

Page 189: From: To: Cc: Subject: FW: TI Presidential Transition (FINAL … · 2019-04-15 · Subject: FW: TI Presidential Transition (FINAL 2).pptx FENCE & ROADS ALCON, Please find attached

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

BW11 FOIA CBP 003225

Page 190: From: To: Cc: Subject: FW: TI Presidential Transition (FINAL … · 2019-04-15 · Subject: FW: TI Presidential Transition (FINAL 2).pptx FENCE & ROADS ALCON, Please find attached

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

BW11 FOIA CBP 003226

Page 191: From: To: Cc: Subject: FW: TI Presidential Transition (FINAL … · 2019-04-15 · Subject: FW: TI Presidential Transition (FINAL 2).pptx FENCE & ROADS ALCON, Please find attached

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

BW11 FOIA CBP 003227

Page 192: From: To: Cc: Subject: FW: TI Presidential Transition (FINAL … · 2019-04-15 · Subject: FW: TI Presidential Transition (FINAL 2).pptx FENCE & ROADS ALCON, Please find attached

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

BW11 FOIA CBP 003228

Page 193: From: To: Cc: Subject: FW: TI Presidential Transition (FINAL … · 2019-04-15 · Subject: FW: TI Presidential Transition (FINAL 2).pptx FENCE & ROADS ALCON, Please find attached

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

BW11 FOIA CBP 003229

Page 194: From: To: Cc: Subject: FW: TI Presidential Transition (FINAL … · 2019-04-15 · Subject: FW: TI Presidential Transition (FINAL 2).pptx FENCE & ROADS ALCON, Please find attached

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

BW11 FOIA CBP 003230

Page 195: From: To: Cc: Subject: FW: TI Presidential Transition (FINAL … · 2019-04-15 · Subject: FW: TI Presidential Transition (FINAL 2).pptx FENCE & ROADS ALCON, Please find attached

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

BW11 FOIA CBP 003231

Page 196: From: To: Cc: Subject: FW: TI Presidential Transition (FINAL … · 2019-04-15 · Subject: FW: TI Presidential Transition (FINAL 2).pptx FENCE & ROADS ALCON, Please find attached

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

BW11 FOIA CBP 003232

Page 197: From: To: Cc: Subject: FW: TI Presidential Transition (FINAL … · 2019-04-15 · Subject: FW: TI Presidential Transition (FINAL 2).pptx FENCE & ROADS ALCON, Please find attached

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

BW11 FOIA CBP 003233

Page 198: From: To: Cc: Subject: FW: TI Presidential Transition (FINAL … · 2019-04-15 · Subject: FW: TI Presidential Transition (FINAL 2).pptx FENCE & ROADS ALCON, Please find attached

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

BW11 FOIA CBP 003234

Page 199: From: To: Cc: Subject: FW: TI Presidential Transition (FINAL … · 2019-04-15 · Subject: FW: TI Presidential Transition (FINAL 2).pptx FENCE & ROADS ALCON, Please find attached

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

BW11 FOIA CBP 003235

Page 200: From: To: Cc: Subject: FW: TI Presidential Transition (FINAL … · 2019-04-15 · Subject: FW: TI Presidential Transition (FINAL 2).pptx FENCE & ROADS ALCON, Please find attached

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

BW11 FOIA CBP 003236

Page 201: From: To: Cc: Subject: FW: TI Presidential Transition (FINAL … · 2019-04-15 · Subject: FW: TI Presidential Transition (FINAL 2).pptx FENCE & ROADS ALCON, Please find attached

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

BW11 FOIA CBP 003237

Page 202: From: To: Cc: Subject: FW: TI Presidential Transition (FINAL … · 2019-04-15 · Subject: FW: TI Presidential Transition (FINAL 2).pptx FENCE & ROADS ALCON, Please find attached

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

BW11 FOIA CBP 003238

Page 203: From: To: Cc: Subject: FW: TI Presidential Transition (FINAL … · 2019-04-15 · Subject: FW: TI Presidential Transition (FINAL 2).pptx FENCE & ROADS ALCON, Please find attached

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

BW11 FOIA CBP 003239

Page 204: From: To: Cc: Subject: FW: TI Presidential Transition (FINAL … · 2019-04-15 · Subject: FW: TI Presidential Transition (FINAL 2).pptx FENCE & ROADS ALCON, Please find attached

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

BW11 FOIA CBP 003240

Page 205: From: To: Cc: Subject: FW: TI Presidential Transition (FINAL … · 2019-04-15 · Subject: FW: TI Presidential Transition (FINAL 2).pptx FENCE & ROADS ALCON, Please find attached

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

BW11 FOIA CBP 003241

Page 206: From: To: Cc: Subject: FW: TI Presidential Transition (FINAL … · 2019-04-15 · Subject: FW: TI Presidential Transition (FINAL 2).pptx FENCE & ROADS ALCON, Please find attached

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

BW11 FOIA CBP 003242

Page 207: From: To: Cc: Subject: FW: TI Presidential Transition (FINAL … · 2019-04-15 · Subject: FW: TI Presidential Transition (FINAL 2).pptx FENCE & ROADS ALCON, Please find attached

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

BW11 FOIA CBP 003243

Page 208: From: To: Cc: Subject: FW: TI Presidential Transition (FINAL … · 2019-04-15 · Subject: FW: TI Presidential Transition (FINAL 2).pptx FENCE & ROADS ALCON, Please find attached

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

BW11 FOIA CBP 003244

Page 209: From: To: Cc: Subject: FW: TI Presidential Transition (FINAL … · 2019-04-15 · Subject: FW: TI Presidential Transition (FINAL 2).pptx FENCE & ROADS ALCON, Please find attached

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

BW11 FOIA CBP 003245

Page 210: From: To: Cc: Subject: FW: TI Presidential Transition (FINAL … · 2019-04-15 · Subject: FW: TI Presidential Transition (FINAL 2).pptx FENCE & ROADS ALCON, Please find attached

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

BW11 FOIA CBP 003246

Page 211: From: To: Cc: Subject: FW: TI Presidential Transition (FINAL … · 2019-04-15 · Subject: FW: TI Presidential Transition (FINAL 2).pptx FENCE & ROADS ALCON, Please find attached

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

BW11 FOIA CBP 003247

Page 212: From: To: Cc: Subject: FW: TI Presidential Transition (FINAL … · 2019-04-15 · Subject: FW: TI Presidential Transition (FINAL 2).pptx FENCE & ROADS ALCON, Please find attached

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

BW11 FOIA CBP 003248

Page 213: From: To: Cc: Subject: FW: TI Presidential Transition (FINAL … · 2019-04-15 · Subject: FW: TI Presidential Transition (FINAL 2).pptx FENCE & ROADS ALCON, Please find attached

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

BW11 FOIA CBP 003249

Page 214: From: To: Cc: Subject: FW: TI Presidential Transition (FINAL … · 2019-04-15 · Subject: FW: TI Presidential Transition (FINAL 2).pptx FENCE & ROADS ALCON, Please find attached

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

BW11 FOIA CBP 003250

Page 215: From: To: Cc: Subject: FW: TI Presidential Transition (FINAL … · 2019-04-15 · Subject: FW: TI Presidential Transition (FINAL 2).pptx FENCE & ROADS ALCON, Please find attached

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

#N/A #N/A

BW11 FOIA CBP 003251

Page 216: From: To: Cc: Subject: FW: TI Presidential Transition (FINAL … · 2019-04-15 · Subject: FW: TI Presidential Transition (FINAL 2).pptx FENCE & ROADS ALCON, Please find attached

Long_Start Lat_End Long_End Fence_Program Operational_Category Length_Mi Comments 

Unconst. PF Operationally Achievable with TI  New P

Unconst. VF Operationally Achievable with TI  New Ve

PF Secondary Operationally Achievable with TI New Seco

PF Secondary Operationally Achievable with TI New Seco

PF Secondary Operationally Achievable with TI New Seco

PF Secondary Operationally Achievable with TI New Seco

PF Secondary Operationally Achievable with TI New Seco

PF Secondary Operationally Achievable with TI New Seco

PF Secondary Operationally Achievable with TI New Seco

PF Secondary Operationally Achievable with TI New Seco

PF Secondary Operationally Achievable with TI New Seco

PF Secondary Operationally Achievable with TI New Seco

PF Secondary Operationally Achievable with TI New Seco

PF Replacement Replacement Fence Replacem

PF Replacement Replacement Fence Replacem

PF Replacement Replacement Fence Replacem

PF Replacement Replacement Fence Replacem

PF Replacement Replacement Fence Replacem

PF Replacement Replacement Fence Replacem

PF Replacement Replacement Fence Replacem

PF Replacement Replacement Fence Replacem

PF Replacement Replacement Fence Replacem

PF Replacement Replacement Fence Replacem

PF Replacement Replacement Fence Replacem

PF Replacement Replacement Fence  Replace

PF Replacement Replacement Fence  Replace

PF Replacement Replacement Fence  Replace

PF Replacement Replacement Fence  Replace

PF Replacement Replacement Fence  Replace

PF Replacement Replacement Fence  Replace

PF Replacement Replacement Fence  Replace

PF Replacement Replacement Fence  Replace

PF Replacement Replacement Fence  Replace

PF Replacement Replacement Fence  Replace

PF Replacement Replacement Fence  Replace

PF Replacement Replacement Fence  Replace

PF Replacement Replacement Fence  Replace

PF Replacement Replacement Fence  Replace

PF Replacement Replacement Fence  Replace

PF Replacement Replacement Fence  Replace

PF Replacement Replacement Fence  Replace

PF Replacement Replacement Fence  Replace

PF Replacement Replacement Fence  Replace

PF Replacement Replacement Fence  Replace

PF Secondary Operationally Achievable with TI  New Se

PF Secondary Operationally Achievable with TI  New Se

BW11 FOIA CBP 003252

(b) (7)(E)(b) (7)(E) (b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

Page 217: From: To: Cc: Subject: FW: TI Presidential Transition (FINAL … · 2019-04-15 · Subject: FW: TI Presidential Transition (FINAL 2).pptx FENCE & ROADS ALCON, Please find attached

PF Secondary Operationally Achievable with TI  New Se

PF Secondary Operationally Achievable with TI  New Se

PF Secondary Operationally Achievable with TI  New Se

PF Secondary Operationally Achievable with TI  New Se

PF Secondary Operationally Achievable with TI  New Se

PF Secondary Operationally Achievable with TI  New Se

PF Secondary Operationally Achievable with TI  New Se

PF Secondary Operationally Achievable with TI  New Se

PF Secondary Operationally Achievable with TI  New Se

PF Secondary Operationally Achievable with TI  New Se

PF Secondary Operationally Achievable with TI  New Se

PF Secondary Operationally Achievable with TI  New Se

PF Secondary Operationally Achievable with TI  New Se

PF Secondary Operationally Achievable with TI  New Se

PF Secondary Operationally Achievable with TI  New Se

PF Secondary Operationally Achievable with TI  New Se

PF Secondary Operationally Achievable with TI  New Se

PF Secondary Operationally Achievable with TI  New Se

VF to PF VF to PF Revised pe

VF to PF VF to PF Revised pe

VF to PF VF to PF Revised pe

VF to PF VF to PF Revised pe

VF to PF VF to PF Revised pe

PF Primary Operationally Achievable with TI New Pri

PF Primary Operationally Achievable with TI New Pri

PF Primary Operationally Achievable with TI New Pri

PF Primary Operationally Achievable with TI New Pri

PF Primary Operationally Achievable with TI  New P

PF Primary Operationally Achievable with TI  New P

PF Primary Operationally Achievable with TI  New P

PF Primary Operationally Achievable with TI  New P

PF Primary Operationally Achievable with TI  New P

PF Primary Operationally Achievable with TI  New P

PF Replacement Replacement Fence Revised pe

PF Replacement Replacement Fence Revised pe

PF Replacement Replacement Fence Revised pe

PF Replacement Replacement Fence Revised pe

PF Replacement Replacement Fence Revised pe

PF Primary Operationally Achievable with TI  New 

PF Primary Operationally Achievable with TI  New 

PF Primary Operationally Achievable with TI  New 

PF Primary Operationally Achievable with TI  New 

Unconst. PF Operationally Achievable with TI  New 

Unconst. PF Operationally Achievable with TI  New 

Unconst. PF Operationally Achievable with TI  New 

Unconst. PF Operationally Achievable with TI  New 

Unconst. PF Operationally Achievable with TI  New 

BW11 FOIA CBP 003253

(b) (7)(E)(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

Page 218: From: To: Cc: Subject: FW: TI Presidential Transition (FINAL … · 2019-04-15 · Subject: FW: TI Presidential Transition (FINAL 2).pptx FENCE & ROADS ALCON, Please find attached

Unconst. PF Operationally Achievable with TI  New 

Unconst. PF Operationally Achievable with TI  New 

Unconst. PF Operationally Achievable with TI  New 

Unconst. PF Operationally Achievable with TI  New 

Unconst. PF Operationally Achievable with TI  New 

Unconst. PF Operationally Achievable with TI  New 

Unconst. PF Operationally Achievable with TI  New 

Unconst. PF Operationally Achievable with TI  New 

Unconst. PF Operationally Achievable with TI  New 

Unconst. PF Operationally Achievable with TI  New 

Unconst. PF Operationally Achievable with TI  New 

Unconst. PF Operationally Achievable with TI  New 

Unconst. PF Operationally Achievable with TI  New 

Unconst. PF Operationally Achievable with TI  New 

Unconst. PF Operationally Achievable with TI  New 

Unconst. PF Operationally Achievable with TI  New 

Unconst. PF Operationally Achievable with TI  New 

Unconst. PF Operationally Achievable with TI  New 

Unconst. PF Operationally Achievable with TI  New 

Unconst. PF Operationally Achievable with TI  New 

Unconst. PF Operationally Achievable with TI  New 

Unconst. PF Operationally Achievable with TI  New 

Unconst. PF Operationally Achievable with TI  New 

Unconst. PF Operationally Achievable with TI  New 

Unconst. PF Operationally Achievable with TI  New 

Unconst. PF Operationally Achievable with TI  New 

Unconst. PF Operationally Achievable with TI  New 

Unconst. PF Operationally Achievable with TI  New 

Unconst. PF Operationally Achievable with TI  New 

Unconst. PF Operationally Achievable with TI  New 

Unconst. PF Operationally Achievable with TI  New 

Unconst. PF Operationally Achievable with TI  New 

Unconst. PF Operationally Achievable with TI  New 

Unconst. PF Operationally Achievable with TI  New 

Unconst. PF Operationally Achievable with TI  New 

Unconst. PF Operationally Achievable with TI  New 

Unconst. PF Operationally Achievable with TI  New 

Unconst. PF Operationally Achievable with TI  New 

Unconst. PF Operationally Achievable with TI  New 

Unconst. PF Operationally Achievable with TI  New 

Unconst. PF Operationally Achievable with TI  New 

Unconst. PF Operationally Achievable with TI  New 

Unconst. PF Operationally Achievable with TI  New 

Unconst. PF Operationally Achievable with TI  New 

Unconst. PF Operationally Achievable with TI  New 

Unconst. PF Operationally Achievable with TI  New 

Unconst. PF Operationally Achievable with TI  New 

BW11 FOIA CBP 003254

(b) (7)(E)(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E) (b) (7)(E)

Page 219: From: To: Cc: Subject: FW: TI Presidential Transition (FINAL … · 2019-04-15 · Subject: FW: TI Presidential Transition (FINAL 2).pptx FENCE & ROADS ALCON, Please find attached

Unconst. PF Operationally Achievable with TI  New 

Unconst. PF Operationally Achievable with TI  New 

Unconst. PF Operationally Achievable with TI  New 

Unconst. PF Operationally Achievable with TI  New 

Unconst. PF Operationally Achievable with TI  New 

Unconst. PF Operationally Achievable with TI  New 

Unconst. PF Operationally Achievable with TI  New 

Unconst. PF Operationally Achievable with TI  New 

Unconst. PF Operationally Achievable with TI  New 

Unconst. PF Operationally Achievable with TI  New 

Unconst. PF Operationally Achievable with TI  New 

Unconst. PF Operationally Achievable with TI  New 

Unconst. PF Operationally Achievable with TI  New 

Unconst. PF Operationally Achievable with TI  New 

Unconst. PF Operationally Achievable with TI  New 

Unconst. PF Operationally Achievable with TI  New 

Unconst. PF Operationally Achievable with TI  New 

Unconst. PF Operationally Achievable with TI  New 

Unconst. PF Operationally Achievable with TI  New 

Unconst. PF Operationally Achievable with TI  New 

Unconst. PF Operationally Achievable with TI  New 

Unconst. PF Operationally Achievable with TI  New 

Unconst. PF Operationally Achievable with TI  New 

Unconst. PF Operationally Achievable with TI  New 

Unconst. PF Operationally Achievable with TI  New 

Unconst. PF Operationally Achievable with TI  New 

Unconst. PF Operationally Achievable with TI  New 

Unconst. PF Operationally Achievable with TI  New 

Unconst. PF Operationally Achievable with TI  New 

Unconst. PF Operationally Achievable with TI  New 

Unconst. PF Operationally Achievable with TI  New 

Unconst. PF Operationally Achievable with TI  New 

Unconst. PF Operationally Achievable with TI  New 

Unconst. PF Operationally Achievable with TI  New 

Unconst. PF Operationally Achievable with TI  New 

Unconst. PF Operationally Achievable with TI  New 

Unconst. PF Operationally Achievable with TI  New 

Unconst. PF Operationally Achievable with TI  New 

Unconst. PF Operationally Achievable with TI  New 

Unconst. PF Operationally Achievable with TI  New 

Unconst. PF Operationally Achievable with TI  New 

Unconst. PF Operationally Achievable with TI  New 

Unconst. PF Operationally Achievable with TI  New 

Unconst. PF Operationally Achievable with TI  New 

Unconst. PF Operationally Achievable with TI  New 

Unconst. PF Operationally Achievable with TI  New 

Unconst. PF Operationally Achievable with TI  New 

BW11 FOIA CBP 003255

(b) (7)(E)(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E) (b) (7)(E)

Page 220: From: To: Cc: Subject: FW: TI Presidential Transition (FINAL … · 2019-04-15 · Subject: FW: TI Presidential Transition (FINAL 2).pptx FENCE & ROADS ALCON, Please find attached

Unconst. PF Operationally Achievable with TI  New 

PF Primary Operationally Achievable with TI  New P

PF Primary Operationally Achievable with TI  New P

PF Primary Operationally Achievable with TI  New P

PF Primary Operationally Achievable with TI  New P

PF Primary Operationally Achievable with TI  New P

PF Primary Operationally Achievable with TI  New P

PF Primary Operationally Achievable with TI  New P

PF Primary Operationally Achievable with TI  New P

PF Primary Operationally Achievable with TI  New P

PF Primary Operationally Achievable with TI  New P

PF Primary Operationally Achievable with TI  New P

PF Primary Operationally Achievable with TI  New P

PF Primary Operationally Achievable with TI  New P

PF Primary Operationally Achievable with TI  New P

PF Primary Operationally Achievable with TI  New P

PF Primary Operationally Achievable with TI  New P

PF Primary Operationally Achievable with TI  New P

PF Primary Operationally Achievable with TI  New P

PF Primary Operationally Achievable with TI  New P

PF Primary Operationally Achievable with TI  New P

PF Primary Operationally Achievable with TI  New P

PF Primary Operationally Achievable with TI  New P

PF Primary Operationally Achievable with TI  New P

PF Primary Operationally Achievable with TI  New P

PF Primary Operationally Achievable with TI  New P

PF Primary Operationally Achievable with TI  New P

PF Primary Operationally Achievable with TI  New P

PF Primary Operationally Achievable with TI  New P

PF Primary Operationally Achievable with TI  New P

PF Primary Operationally Achievable with TI  New P

PF Primary Operationally Achievable with TI  New P

PF Primary Operationally Achievable with TI  New P

PF Primary Operationally Achievable with TI  New P

PF Primary Operationally Achievable with TI  New P

PF Primary Operationally Achievable with TI  New P

PF Primary Operationally Achievable with TI  New P

PF Primary Operationally Achievable with TI  New P

PF Primary Operationally Achievable with TI  New P

PF Primary Operationally Achievable with TI  New P

PF Primary Operationally Achievable with TI  New P

PF Primary Operationally Achievable with TI  New P

PF Primary Operationally Achievable with TI  New P

PF Primary Operationally Achievable with TI  New P

PF Primary Operationally Achievable with TI  New P

PF Primary Operationally Achievable with TI  New P

PF Primary Operationally Achievable with TI  New P

BW11 FOIA CBP 003256

(b) (7)(E)(b) (7)(E)

(b) (7)(E)(b) (7)(E) (b) (7)(E)(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

Page 221: From: To: Cc: Subject: FW: TI Presidential Transition (FINAL … · 2019-04-15 · Subject: FW: TI Presidential Transition (FINAL 2).pptx FENCE & ROADS ALCON, Please find attached

PF Primary Operationally Achievable with TI  New P

PF Primary Operationally Achievable with TI  New P

PF Primary Operationally Achievable with TI  New P

PF Primary Operationally Achievable with TI  New P

PF Primary Operationally Achievable with TI  New P

PF Primary Operationally Achievable with TI  New P

PF Primary Operationally Achievable with TI  New P

PF Primary Operationally Achievable with TI  New P

PF Primary Operationally Achievable with TI  New P

PF Primary Operationally Achievable with TI  New P

PF Primary Operationally Achievable with TI  New P

PF Primary Operationally Achievable with TI  New P

PF Primary Operationally Achievable with TI  New P

PF Primary Operationally Achievable with TI  New P

PF Primary Operationally Achievable with TI  New P

PF Primary Operationally Achievable with TI  New P

PF Primary Operationally Achievable with TI  New P

PF Primary Operationally Achievable with TI  New P

PF Primary Operationally Achievable with TI  New P

PF Primary Operationally Achievable with TI  New P

PF Primary Operationally Achievable with TI  New P

PF Primary Operationally Achievable with TI  New P

PF Primary Operationally Achievable with TI  New P

PF Primary Operationally Achievable with TI  New P

PF Primary Operationally Achievable with TI  New P

PF Primary Operationally Achievable with TI  New P

PF Primary Operationally Achievable with TI  New P

PF Primary Operationally Achievable with TI  New P

PF Primary Operationally Achievable with TI  New P

PF Primary Operationally Achievable with TI  New P

PF Primary Operationally Achievable with TI  New P

PF Primary Operationally Achievable with TI  New P

PF Primary Operationally Achievable with TI  New P

PF Primary Operationally Achievable with TI  New P

PF Primary Operationally Achievable with TI  New P

PF Primary Operationally Achievable with TI  New P

PF Primary Operationally Achievable with TI  New P

PF Primary Operationally Achievable with TI  New P

PF Primary Operationally Achievable with TI  New P

PF Primary Operationally Achievable with TI  New P

PF Primary Operationally Achievable with TI  New P

PF Primary Operationally Achievable with TI  New P

PF Primary Operationally Achievable with TI  New P

PF Primary Operationally Achievable with TI  New P

PF Primary Operationally Achievable with TI  New P

PF Primary Operationally Achievable with TI  New P

PF Primary Operationally Achievable with TI  New P

BW11 FOIA CBP 003257

(b) (7)(E)(b) (7)(E)

(b) (7)(E) (b) (7)(E)(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

Page 222: From: To: Cc: Subject: FW: TI Presidential Transition (FINAL … · 2019-04-15 · Subject: FW: TI Presidential Transition (FINAL 2).pptx FENCE & ROADS ALCON, Please find attached

PF Primary Operationally Achievable with TI  New P

PF Primary Operationally Achievable with TI  New P

PF Primary Operationally Achievable with TI  New P

PF Primary Operationally Achievable with TI  New P

PF Primary Operationally Achievable with TI  New P

PF Primary Operationally Achievable with TI  New P

PF Primary Operationally Achievable with TI  New P

PF Primary Operationally Achievable with TI  New P

PF Primary Operationally Achievable with TI  New P

PF Primary Operationally Achievable with TI  New P

PF Primary Operationally Achievable with TI  New P

PF Primary Operationally Achievable with TI  New P

PF Primary Operationally Achievable with TI  New P

PF Primary Operationally Achievable with TI  New P

PF Primary Operationally Achievable with TI  New P

PF Primary Operationally Achievable with TI  New P

PF Primary Operationally Achievable with TI  New P

PF Primary Operationally Achievable with TI  New P

PF Primary Operationally Achievable with TI  New P

PF Primary Operationally Achievable with TI  New P

PF Primary Operationally Achievable with TI  New P

PF Primary Operationally Achievable with TI  New P

PF Primary Operationally Achievable with TI  New P

PF Primary Operationally Achievable with TI  New P

PF Primary Operationally Achievable with TI  New P

PF Primary Operationally Achievable with TI  New P

PF Primary Operationally Achievable with TI  New P

PF Primary Operationally Achievable with TI  New P

PF Primary Operationally Achievable with TI  New P

PF Primary Operationally Achievable with TI  New P

PF Primary Operationally Achievable with TI  New P

PF Primary Operationally Achievable with TI  New P

PF Primary Operationally Achievable with TI  New P

PF Primary Operationally Achievable with TI  New P

PF Primary Operationally Achievable with TI  New P

PF Primary Operationally Achievable with TI  New P

PF Primary Operationally Achievable with TI  New P

PF Primary Operationally Achievable with TI  New P

PF Primary Operationally Achievable with TI  New P

PF Primary Operationally Achievable with TI  New P

PF Primary Operationally Achievable with TI  New P

PF Primary Operationally Achievable with TI  New P

PF Primary Operationally Achievable with TI  New P

PF Primary Operationally Achievable with TI  New P

PF Primary Operationally Achievable with TI  New P

PF Primary Operationally Achievable with TI  New P

PF Primary Operationally Achievable with TI Revised pe

BW11 FOIA CBP 003258

(b) (7)(E)(b) (7)(E)

(b) (7)(E) (b) (7)(E)(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

Page 223: From: To: Cc: Subject: FW: TI Presidential Transition (FINAL … · 2019-04-15 · Subject: FW: TI Presidential Transition (FINAL 2).pptx FENCE & ROADS ALCON, Please find attached

PF Primary Operationally Achievable with TI Revised pe

PF Primary Operationally Achievable with TI Revised pe

PF Primary Operationally Achievable with TI  New 

PF Primary Operationally Achievable with TI  New 

PF Primary Operationally Achievable with TI  New 

PF Primary Operationally Achievable with TI  New 

PF Primary Operationally Achievable with TI  New 

VF to PF VF to PF Revised pe

VF to PF VF to PF Revised pe

VF to PF VF to PF Revised pe

VF to PF VF to PF Revised pe

VF to PF VF to PF Revised pe

VF to PF VF to PF Revised pe

VF to PF VF to PF Revised pe

VF to PF VF to PF Revised pe

VF to PF VF to PF Revised pe

VF to PF VF to PF Revised pe

VF to PF VF to PF Revised pe

VF to PF VF to PF Revised pe

VF to PF VF to PF Revised pe

VF to PF VF to PF Revised pe

VF to PF VF to PF Revised pe

VF to PF VF to PF Revised pe

VF to PF VF to PF Revised pe

VF to PF VF to PF Revised pe

VF to PF VF to PF Revised pe

VF to PF VF to PF Revised pe

VF to PF VF to PF Revised pe

PF Secondary Operationally Achievable with TI or   New 

PF Secondary Operationally Achievable with TI or   New 

PF Secondary Operationally Achievable with TI or   New 

PF Secondary Operationally Achievable with TI or   New 

PF Secondary Operationally Achievable with TI or   New 

PF Secondary Operationally Achievable with TI or   New 

PF Secondary Operationally Achievable with TI or   New 

PF Secondary Operationally Achievable with TI or   New 

PF Secondary Operationally Achievable with TI or   New 

PF Secondary Operationally Achievable with TI or   New 

PF Secondary Operationally Achievable with TI or   New 

PF Secondary Operationally Achievable with TI or   New 

PF Secondary Operationally Achievable with TI or   New 

PF Secondary Operationally Achievable with TI or   New 

PF Secondary Operationally Achievable with TI or   New 

PF Secondary Operationally Achievable with TI or   New 

PF Secondary Operationally Achievable with TI or   New 

PF Secondary Operationally Achievable with TI or   New 

PF Secondary Operationally Achievable with TI or   New 

BW11 FOIA CBP 003259

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)(b) (7)(E)

(b) (7)(E) (b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

Page 224: From: To: Cc: Subject: FW: TI Presidential Transition (FINAL … · 2019-04-15 · Subject: FW: TI Presidential Transition (FINAL 2).pptx FENCE & ROADS ALCON, Please find attached

PF Secondary Operationally Achievable with TI or   New 

PF Secondary Operationally Achievable with TI or   New 

PF Secondary Operationally Achievable with TI or   New 

PF Secondary Operationally Achievable with TI or   New 

PF Secondary Operationally Achievable with TI or   New 

PF Secondary Operationally Achievable with TI or   New 

PF Secondary Operationally Achievable with TI or   New 

PF Secondary Operationally Achievable with TI or   New 

PF Secondary Operationally Achievable with TI or   New 

PF Secondary Operationally Achievable with TI or   New 

PF Secondary Operationally Achievable with TI or   New 

PF Secondary Operationally Achievable with TI or   New 

PF Secondary Operationally Achievable with TI or   New 

PF Secondary Operationally Achievable with TI or   New 

PF Secondary Operationally Achievable with TI or   New 

PF Secondary Operationally Achievable with TI or   New 

PF Secondary Operationally Achievable with TI or   New 

PF Secondary Operationally Achievable with TI or   New 

PF Secondary Operationally Achievable with TI or   New 

PF Secondary Operationally Achievable with TI or   New 

PF Secondary Operationally Achievable with TI or   New 

PF Secondary Operationally Achievable with TI or   New 

PF Secondary Operationally Achievable with TI or   New 

PF Secondary Operationally Achievable with TI or   New 

PF Secondary Operationally Achievable with TI or   New 

PF Secondary Operationally Achievable with TI or   New 

PF Secondary Operationally Achievable with TI or   New 

PF Secondary Operationally Achievable with TI or   New 

PF Secondary Operationally Achievable with TI or   New 

PF Secondary Operationally Achievable with TI or   New 

PF Secondary Operationally Achievable with TI or   New 

PF Secondary Operationally Achievable with TI or   New 

PF Secondary Operationally Achievable with TI or   New 

PF Secondary Operationally Achievable with TI or   New 

PF Secondary Operationally Achievable with TI or   New 

PF Secondary Operationally Achievable with TI or   New 

PF Secondary Operationally Achievable with TI or   New 

PF Secondary Operationally Achievable with TI or   New 

PF Secondary Operationally Achievable with TI or   New S

PF Secondary Operationally Achievable with TI or   New S

PF Secondary Operationally Achievable with TI or   New S

PF Secondary Operationally Achievable with TI or   New S

PF Primary Operationally Achievable with TI  New Pr

PF Primary Operationally Achievable with TI  New Pr

PF Primary Operationally Achievable with TI  New Pr

PF Primary Operationally Achievable with TI  New Pr

PF Primary Operationally Achievable with TI  New Pr

BW11 FOIA CBP 003260

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)(b) (7)(E)

(b) (7)(E) (b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

Page 225: From: To: Cc: Subject: FW: TI Presidential Transition (FINAL … · 2019-04-15 · Subject: FW: TI Presidential Transition (FINAL 2).pptx FENCE & ROADS ALCON, Please find attached

PF Primary Operationally Achievable with TI  New Pr

PF Primary Operationally Achievable with TI  New Pr

PF Primary Operationally Achievable with TI  New Pr

PF Primary Operationally Achievable with TI New Pr

PF Primary Operationally Achievable with TI New Prim

PF Primary Operationally Achievable with TI New Prim

PF Primary Operationally Achievable with TI New Prim

PF Primary Operationally Achievable with TI  New P

PF Primary Operationally Achievable with TI  New P

PF Secondary Operationally Achievable with TI or  Revised pe

PF Secondary Operationally Achievable with TI or   New Se

PF Secondary Operationally Achievable with TI or   New Se

PF Secondary Operationally Achievable with TI or   New Se

PF Secondary Operationally Achievable with TI or   New Se

PF Secondary Operationally Achievable with TI or   New Se

PF Secondary Operationally Achievable with TI or   New Se

PF Secondary Operationally Achievable with TI or   New Se

PF Secondary Operationally Achievable with TI or   New Se

PF Secondary Operationally Achievable with TI or   New Se

PF Secondary Operationally Achievable with TI or   New Se

PF Secondary Operationally Achievable with TI or  New Seco

PF Secondary Operationally Achievable with TI or  New Seco

PF Secondary Operationally Achievable with TI or  New Seco

PF Secondary Operationally Achievable with TI or   New S

PF Secondary Operationally Achievable with TI or   New S

PF Primary Operationally Achievable with TI Not include

PF Primary Operationally Achievable with TI Not include

PF Primary Operationally Achievable with TI Not include

PF Primary Operationally Achievable with TI Not include

PF Primary Operationally Achievable with TI Not include

PF Primary Operationally Achievable with TI Not include

PF Primary Operationally Achievable with TI Not include

PF Primary Operationally Achievable with TI Not include

PF Primary Operationally Achievable with TI Not include

PF Primary Operationally Achievable with TI Not include

PF Primary Operationally Achievable with TI Not include

PF Primary Operationally Achievable with TI Not include

PF Primary Operationally Achievable with TI Not include

PF Primary Operationally Achievable with TI Not include

PF Primary Operationally Achievable with TI Not include

PF Primary Operationally Achievable with TI Not include

PF Primary Operationally Achievable with TI Replace wit

PF Primary Operationally Achievable with TI Replace wit

PF Primary Operationally Achievable with TI Replace wit

PF Primary Operationally Achievable with TI Replace wit

PF Primary Operationally Achievable with TI Replace wit

PF Primary Operationally Achievable with TI Replace wit

BW11 FOIA CBP 003261

(b) (7)(E)(b) (7)(E)

(b) (7)(E) (b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

Page 226: From: To: Cc: Subject: FW: TI Presidential Transition (FINAL … · 2019-04-15 · Subject: FW: TI Presidential Transition (FINAL 2).pptx FENCE & ROADS ALCON, Please find attached

PF Primary Operationally Achievable with TI Replace wit

PF Primary Operationally Achievable with TI Replace wit

PF Primary Operationally Achievable with TI Replace wit

PF Primary Operationally Achievable with TI Not include

PF Primary Operationally Achievable with TI Not include

PF Primary Operationally Achievable with TI Not include

PF Primary Operationally Achievable with TI Not include

PF Primary Operationally Achievable with TI Not include

PF Primary Operationally Achievable with TI Not include

PF Primary Operationally Achievable with TI <Null>

PF Primary Operationally Achievable with TI <Null>

PF Primary Operationally Achievable with TI <Null>

PF Primary Operationally Achievable with TI <Null>

PF Primary Operationally Achievable with TI <Null>

PF Primary Operationally Achievable with TI <Null>

PF Primary Operationally Achievable with TI <Null>

PF Primary Operationally Achievable with TI <Null>

PF Primary Operationally Achievable with TI <Null>

PF Primary Operationally Achievable with TI <Null>

PF Primary Operationally Achievable with TI <Null>

PF Primary Operationally Achievable with TI <Null>

PF Primary Operationally Achievable with TI <Null>

PF Primary Operationally Achievable with TI <Null>

Unconst. PF Operationally Achievable with TI Revised pe

PF Primary Operationally Achievable with TI Revised pe

PF Primary Operationally Achievable with TI Revised pe

PF Primary Operationally Achievable with TI Revised pe

PF Primary Operationally Achievable with TI Revised pe

PF Primary Operationally Achievable with TI Revised pe

PF Replacement Replacement Fence  Replace

PF Replacement Replacement Fence  Replacem

VF to PF VF to PF Revised pe

VF to PF VF to PF Revised pe

Unconst. PF Operationally Achievable with TI Revised pe

Unconst. PF Operationally Achievable with TI Revised pe

Unconst. PF Operationally Achievable with TI Revised pe

Unconst. PF Operationally Achievable with TI Revised pe

VF to PF VF to PF Revised pe

VF to PF VF to PF Revised pe

VF to PF VF to PF Revised pe

VF to PF VF to PF Revised pe

VF to PF VF to PF Revised pe

VF to PF VF to PF Revised pe

VF to PF VF to PF Revised pe

VF to PF VF to PF Revised pe

VF to PF VF to PF Revised pe

PF Replacement Replacement Fence Replacem

BW11 FOIA CBP 003262

(b) (7)(E)(b) (7)(E)

(b) (7)(E) (b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

Page 227: From: To: Cc: Subject: FW: TI Presidential Transition (FINAL … · 2019-04-15 · Subject: FW: TI Presidential Transition (FINAL 2).pptx FENCE & ROADS ALCON, Please find attached

PF Replacement Replacement Fence  Replacem

PF Replacement Replacement Fence  Replacem

PF Replacement Replacement Fence  Replacem

PF Replacement Replacement Fence  Replacem

PF Replacement Replacement Fence  Replacem

PF Replacement Replacement Fence  Replacem

PF Replacement Replacement Fence  Replace

PF Replacement Replacement Fence  Replace

PF Replacement Replacement Fence  Replace

PF Replacement Replacement Fence  Replace

PF Replacement Replacement Fence  Replacem

PF Replacement Replacement Fence  Replacem

PF Replacement Replacement Fence  Replacem

PF Replacement Replacement Fence  Replacem

PF Replacement Replacement Fence  Replacem

PF Replacement Replacement Fence  re

PF Replacement Replacement Fence  re

PF Replacement Replacement Fence  re

PF Secondary Operationally Achievable with TI Length revi

PF Secondary Operationally Achievable with TI Length revi

PF Secondary Operationally Achievable with TI Length revi

PF Secondary Operationally Achievable with TI Length revi

PF Primary Operationally Achievable with TI New P

PF Primary Operationally Achievable with TI New P

PF Primary Operationally Achievable with TI ew Pr

VF Primary Operationally Achievable with TI New V

VF Primary Operationally Achievable with TI New V

VF Primary Operationally Achievable with TI New V

VF Primary Operationally Achievable with TI New V

VF Primary Operationally Achievable with TI New V

VF Primary Operationally Achievable with TI New V

VF Primary Operationally Achievable with TI New V

VF Primary Operationally Achievable with TI New V

VF Primary Operationally Achievable with TI New V

VF Primary Operationally Achievable with TI New V

VF Primary Operationally Achievable with TI New V

VF Primary Operationally Achievable with TI New V

VF Primary Operationally Achievable with TI New V

VF Primary Operationally Achievable with TI New V

VF Primary Operationally Achievable with TI New Ve

VF Primary Operationally Achievable with TI  New V

VF Primary Operationally Achievable with TI  New V

VF Primary Operationally Achievable with TI  New V

VF Primary Operationally Achievable with TI  New V

VF Primary Operationally Achievable with TI  New V

VF Primary Operationally Achievable with TI  New V

VF Primary Operationally Achievable with TI  New V

BW11 FOIA CBP 003263

(b) (7)(E)(b) (7)(E)

(b) (7)(E) (b) (7)(E)(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

Page 228: From: To: Cc: Subject: FW: TI Presidential Transition (FINAL … · 2019-04-15 · Subject: FW: TI Presidential Transition (FINAL 2).pptx FENCE & ROADS ALCON, Please find attached

VF Primary Operationally Achievable with TI New V

VF Primary Operationally Achievable with TI New V

VF Primary Operationally Achievable with TI New V

VF Primary Operationally Achievable with TI New V

VF Primary Operationally Achievable with TI New V

VF Primary Operationally Achievable with TI New V

VF Primary Operationally Achievable with TI New V

VF Primary Operationally Achievable with TI New V

VF Primary Operationally Achievable with TI New V

VF Primary Operationally Achievable with TI New V

VF Primary Operationally Achievable with TI New V

PF Primary Operationally Achievable with TI New Prim

PF Primary Operationally Achievable with TI New Pr

VF Primary Operationally Achievable with TI New Ve

PF Primary Operationally Achievable with TI  New Pr

VF Primary Operationally Achievable with TI  New Veh

PF Primary Operationally Achievable with TI  New Pr

VF Primary Operationally Achievable with TI New Veh

PF Primary Operationally Achievable with TI  New Pr

VF Primary Operationally Achievable with TI New Veh

PF Primary Operationally Achievable with TI  New Pr

VF Primary Operationally Achievable with TI  New Veh

PF Primary Operationally Achievable with TI  New Pr

VF Primary Operationally Achievable with TI New Ve

PF Primary Operationally Achievable with TI  New Pr

VF Primary Operationally Achievable with TI New Veh

PF Primary Operationally Achievable with TI  New Pr

VF Primary Operationally Achievable with TI New Ve

PF Primary Operationally Achievable with TI  New Pr

PF Primary Operationally Achievable with TI  New Pr

VF Primary Operationally Achievable with TI  New V

PF Primary Operationally Achievable with TI  New Pr

VF Primary Operationally Achievable with TI New Ve

PF Primary Operationally Achievable with TI  New Pr

PF Primary Operationally Achievable with TI  New Pr

PF Primary Operationally Achievable with TI  New Pr

VF Primary Operationally Achievable with TI New Veh

PF Primary Operationally Achievable with TI  New Pr

VF Primary Operationally Achievable with TI  New Veh

PF Primary Operationally Achievable with TI  New Pr

VF Primary Operationally Achievable with TI New Veh

PF Primary Operationally Achievable with TI  New Pr

VF Primary Operationally Achievable with TI New Veh

PF Primary Operationally Achievable with TI  New Pr

VF Primary Operationally Achievable with TI New Ve

PF Primary Operationally Achievable with TI  New Pr

VF Primary Operationally Achievable with TI New Veh

BW11 FOIA CBP 003264

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)(b) (7)(E)

(b) (7)(E) (b) (7)(E)(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

Page 229: From: To: Cc: Subject: FW: TI Presidential Transition (FINAL … · 2019-04-15 · Subject: FW: TI Presidential Transition (FINAL 2).pptx FENCE & ROADS ALCON, Please find attached

PF Primary Operationally Achievable with TI  New Pr

VF Primary Operationally Achievable with TI New Veh

PF Primary Operationally Achievable with TI  New Pr

VF Primary Operationally Achievable with TI New Veh

PF Primary Operationally Achievable with TI  New Pr

VF Primary Operationally Achievable with TI New Veh

PF Primary Operationally Achievable with TI  New Pr

VF Primary Operationally Achievable with TI New Veh

PF Primary Operationally Achievable with TI New Pr

PF Primary Operationally Achievable with TI  New Pr

PF Secondary Operationally Achievable with TI or   New Se

PF Primary Operationally Achievable with TI  New Prim

PF Secondary Operationally Achievable with TI or   New Seco

PF Primary Operationally Achievable with TI New Pr

PF Primary Operationally Achievable with TI  New Pr

PF Primary Operationally Achievable with TI New P

PF Primary Operationally Achievable with TI  New Pr

PF Primary Operationally Achievable with TI New Prim

PF Primary Operationally Achievable with TI New Prim

PF Primary Operationally Achievable with TI New Prim

PF Primary Operationally Achievable with TI New P

PF Primary Operationally Achievable with TI New Pr

PF Primary Operationally Achievable with TI  New P

PF Primary Operationally Achievable with TI  New P

PF Primary Operationally Achievable with TI  New P

VF Primary Operationally Achievable with TI  New V

VF Primary Operationally Achievable with TI  New V

PF Primary Operationally Achievable with TI or  New Prim

PF Primary Operationally Achievable with TI  New Pri

PF Primary Operationally Achievable with TI New Prim

PF Primary Operationally Achievable with TI  New Pr

PF Primary Operationally Achievable with TI  New P

VF Primary Operationally Achievable with TI  New Ve

PF Primary Operationally Achievable with TI  New Pr

PF Primary Operationally Achievable with TI New Prim

VF Primary Operationally Achievable with TI New Veh

VF Primary Operationally Achievable with TI New Veh

PF Primary Operationally Achievable with TI New P

PF Primary Operationally Achievable with TI  New 

PF Primary Operationally Achievable with TI  New P

PF Primary Operationally Achievable with TI New Prim

PF Primary Operationally Achievable with TI New Pr

VF Primary Operationally Achievable with TI  New V

VF to PF VF to PF Revised pe

VF to PF VF to PF Revised pe

VF to PF VF to PF Revised pe

VF to PF VF to PF Revised pe

BW11 FOIA CBP 003265

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)(b) (7)(E)

(b) (7)(E) (b) (7)(E)(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

Page 230: From: To: Cc: Subject: FW: TI Presidential Transition (FINAL … · 2019-04-15 · Subject: FW: TI Presidential Transition (FINAL 2).pptx FENCE & ROADS ALCON, Please find attached

VF to PF VF to PF Revised pe

PF Primary Operationally Achievable with TI Revised pe

PF Primary Operationally Achievable with TI Revised pe

PF Primary Operationally Achievable with TI Revised pe

VF to PF VF to PF Revised pe

VF to PF VF to PF Revised pe

VF to PF VF to PF Revised pe

PF Primary Operationally Achievable with TI Revised pe

VF to PF VF to PF Revised pe

VF to PF VF to PF Revised pe

VF to PF VF to PF Revised pe

VF to PF VF to PF Revised pe

VF to PF VF to PF Revised pe

Unconst. PF Operationally Achievable with TI Revised pe

VF to PF VF to PF Revised pe

VF to PF VF to PF Revised pe

Unconst. PF Operationally Achievable with TI Revised pe

VF to PF VF to PF Revised pe

VF to PF VF to PF Revised pe

Unconst. PF Operationally Achievable with TI Revised pe

VF to PF VF to PF Revised pe

Unconst. PF Operationally Achievable with TI Revised pe

Unconst. PF Operationally Achievable with TI Revised pe

VF to PF VF to PF Revised pe

VF to PF VF to PF Revised pe

VF to PF VF to PF Revised pe

VF to PF VF to PF Revised pe

VF to PF VF to PF Revised pe

PF Primary Operationally Achievable with TI Revised pe

PF Primary Operationally Achievable with TI Revised pe

PF Primary Operationally Achievable with TI Revised pe

PF Primary Operationally Achievable with TI Revised pe

PF Primary Operationally Achievable with TI Revised pe

VF to PF VF to PF Revised pe

VF to PF VF to PF Revised pe

VF to PF VF to PF Revised pe

VF to PF VF to PF Revised pe

VF to PF VF to PF Revised pe

PF Primary Operationally Achievable with TI Revised pe

PF Primary Operationally Achievable with TI Revised pe

PF Primary Operationally Achievable with TI Revised pe

VF to PF VF to PF Revised pe

VF to PF VF to PF Revised pe

VF to PF VF to PF Revised pe

VF to PF VF to PF Revised pe

VF to PF VF to PF Revised pe

PF Replacement Replacement Fence Revised pe

BW11 FOIA CBP 003266

(b) (7)(E)(b) (7)(E)

(b) (7)(E) (b) (7)(E)

Page 231: From: To: Cc: Subject: FW: TI Presidential Transition (FINAL … · 2019-04-15 · Subject: FW: TI Presidential Transition (FINAL 2).pptx FENCE & ROADS ALCON, Please find attached

PF Replacement Replacement Fence Revised pe

PF Replacement Replacement Fence Revised pe

PF Primary Operationally Achievable with TI Revised pe

VF Primary Operationally Achievable with TI  New Ve

VF Primary Operationally Achievable with TI  New Ve

VF Primary Operationally Achievable with TI  New Ve

VF Primary Operationally Achievable with TI  New Ve

VF Primary Operationally Achievable with TI  New Ve

VF Primary Operationally Achievable with TI  New V

PF Primary Operationally Achievable with TI Revised pe

VF to PF VF to PF Revised pe

PF Replacement Replacement Fence Revised pe

PF Replacement Replacement Fence Revised pe

PF Replacement Replacement Fence Revised pe

PF Replacement Replacement Fence Revised pe

PF Replacement Replacement Fence Revised pe

PF Replacement Replacement Fence Revised pe

PF Replacement Replacement Fence Revised pe

PF Replacement Replacement Fence Revised pe

PF Replacement Replacement Fence Revised pe

PF Replacement Replacement Fence Revised pe

PF Replacement Replacement Fence Revised pe

PF Replacement Replacement Fence Revised pe

PF Replacement Replacement Fence Revised pe

PF Replacement Replacement Fence Revised pe

PF Replacement Replacement Fence Revised pe

PF Replacement Replacement Fence Revised pe

PF Replacement Replacement Fence Revised pe

PF Replacement Replacement Fence Revised pe

PF Replacement Replacement Fence Revised pe

PF Replacement Replacement Fence Revised pe

PF Replacement Replacement Fence Revised pe

PF Replacement Replacement Fence Revised pe

PF Replacement Replacement Fence Revised pe

PF Replacement Replacement Fence Revised pe

PF Replacement Replacement Fence Revised pe

PF Replacement Replacement Fence Revised pe

PF Replacement Replacement Fence Revised pe

PF Replacement Replacement Fence Revised pe

PF Replacement Replacement Fence Revised pe

PF Replacement Replacement Fence Revised pe

PF Replacement Replacement Fence Revised pe

PF Replacement Replacement Fence Revised pe

PF Replacement Replacement Fence Revised pe

PF Replacement Replacement Fence Revised pe

PF Replacement Replacement Fence Revised pe

PF Replacement Replacement Fence Revised pe

BW11 FOIA CBP 003267

(b) (7)(E)(b) (7)(E)

(b) (7)(E) (b) (7)(E)

(b) (7)(E)

(b) (7)(E)

Page 232: From: To: Cc: Subject: FW: TI Presidential Transition (FINAL … · 2019-04-15 · Subject: FW: TI Presidential Transition (FINAL 2).pptx FENCE & ROADS ALCON, Please find attached

PF Replacement Replacement Fence Revised pe

PF Replacement Replacement Fence Revised pe

PF Replacement Replacement Fence Revised pe

PF Primary Operationally Achievable with TI Revised pe

PF Primary Operationally Achievable with TI Revised pe

PF Primary Operationally Achievable with TI Revised pe

PF Primary Operationally Achievable with TI Revised pe

PF Primary Operationally Achievable with TI Revised pe

PF Primary Operationally Achievable with TI Revised pe

PF Primary Operationally Achievable with TI Revised pe

PF Replacement Replacement Fence Revised pe

PF Replacement Replacement Fence Revised pe

PF Replacement Replacement Fence Revised pe

PF Replacement Replacement Fence Revised pe

PF Primary Operationally Achievable with TI Revised pe

PF Replacement Replacement Fence Revised pe

PF Secondary Operationally Achievable with TI Revised pe

PF Secondary Operationally Achievable with TI Revised pe

PF Secondary Operationally Achievable with TI Revised pe

PF Secondary Operationally Achievable with TI Revised pe

PF Secondary Operationally Achievable with TI Revised pe

PF Secondary Operationally Achievable with TI Revised pe

PF Secondary Operationally Achievable with TI Revised pe

PF Secondary Operationally Achievable with TI Revised pe

PF Primary Operationally Achievable with TI Revised pe

PF Primary Operationally Achievable with TI Revised pe

PF Primary Operationally Achievable with TI Revised pe

PF Secondary Operationally Achievable with TI Revised pe

PF Replacement Replacement Fence Revised pe

PF Primary Operationally Achievable with TI Revised pe

PF Replacement Replacement Fence Revised pe

PF Primary Operationally Achievable with TI Revised pe

PF Replacement Replacement Fence Revised pe

PF Primary Operationally Achievable with TI Revised pe

PF Replacement Replacement Fence Revised pe

PF Replacement Replacement Fence Revised pe

PF Replacement Replacement Fence Revised pe

PF Replacement Replacement Fence Revised pe

PF Primary Operationally Achievable with TI Revised pe

PF Replacement Replacement Fence Revised pe

PF Replacement Replacement Fence Revised pe

PF Replacement Replacement Fence Revised pe

PF Replacement Replacement Fence Revised pe

PF Primary Operationally Achievable with TI Revised pe

PF Primary Operationally Achievable with TI Revised pe

PF Replacement Replacement Fence Revised pe

PF Replacement Replacement Fence Revised pe

BW11 FOIA CBP 003268

(b) (7)(E)(b) (7)(E)

(b) (7)(E) (b) (7)(E)

Page 233: From: To: Cc: Subject: FW: TI Presidential Transition (FINAL … · 2019-04-15 · Subject: FW: TI Presidential Transition (FINAL 2).pptx FENCE & ROADS ALCON, Please find attached

PF Primary Operationally Achievable with TI Revised pe

PF Replacement Replacement Fence Revised pe

PF Primary Operationally Achievable with TI Revised pe

PF Primary Operationally Achievable with TI Revised pe

PF Secondary Operationally Achievable with TI Revised pe

PF Secondary Operationally Achievable with TI Revised pe

PF Secondary Operationally Achievable with TI Revised pe

PF Secondary Operationally Achievable with TI Revised pe

PF Secondary Operationally Achievable with TI Revised pe

PF Secondary Operationally Achievable with TI Revised pe

PF Secondary Operationally Achievable with TI Revised pe

PF Secondary Operationally Achievable with TI Revised pe

PF Secondary Operationally Achievable with TI Revised pe

PF Secondary Operationally Achievable with TI Revised pe

PF Secondary Operationally Achievable with TI Revised pe

PF Secondary Operationally Achievable with TI Revised pe

PF Secondary Operationally Achievable with TI Revised pe

PF Secondary Operationally Achievable with TI Revised pe

PF Secondary Operationally Achievable with TI Revised pe

PF Secondary Operationally Achievable with TI New S

PF Secondary Operationally Achievable with TI New S

PF Secondary Operationally Achievable with TI New S

PF Secondary Operationally Achievable with TI New S

PF Replacement Replacement Fence  PF Repl

PF Primary Operationally Achievable with TI SHP from S

PF Primary Operationally Achievable with TI SHP from S

PF Primary Operationally Achievable with TI SHP from S

PF Primary Operationally Achievable with TI SHP from S

PF Primary Operationally Achievable with TI SHP from S

PF Primary Operationally Achievable with TI SHP from S

PF Primary Operationally Achievable with TI SHP from S

PF Primary Operationally Achievable with TI SHP from S

PF Primary Operationally Achievable with TI SHP from S

PF Primary Operationally Achievable with TI SHP from S

PF Primary Operationally Achievable with TI SHP from S

PF Primary Operationally Achievable with TI SHP from S

PF Primary Operationally Achievable with TI SHP from S

PF Primary Operationally Achievable with TI SHP from S

PF Primary Operationally Achievable with TI SHP from S

PF Primary Operationally Achievable with TI SHP from S

PF Primary Operationally Achievable with TI SHP from S

PF Primary Operationally Achievable with TI SHP from S

PF Primary Operationally Achievable with TI SHP from S

PF Primary Operationally Achievable with TI SHP from S

PF Primary Operationally Achievable with TI SHP from S

PF Primary Operationally Achievable with TI SHP from S

PF Primary Operationally Achievable with TI SHP from S

BW11 FOIA CBP 003269

(b) (7)(E)(b) (7)(E)

(b) (7)(E) (b) (7)(E)

(b) (7)(E)

(b) (7)(E)

Page 234: From: To: Cc: Subject: FW: TI Presidential Transition (FINAL … · 2019-04-15 · Subject: FW: TI Presidential Transition (FINAL 2).pptx FENCE & ROADS ALCON, Please find attached

PF Primary Operationally Achievable with TI SHP from S

PF Primary Operationally Achievable with TI SHP from S

PF Primary Operationally Achievable with TI SHP from S

PF Primary Operationally Achievable with TI SHP from S

PF Primary Operationally Achievable with TI SHP from S

PF Primary Operationally Achievable with TI SHP from S

PF Primary Operationally Achievable with TI SHP from S

PF Primary Operationally Achievable with TI SHP from S

PF Primary Operationally Achievable with TI SHP from S

PF Primary Operationally Achievable with TI SHP from S

PF Primary Operationally Achievable with TI SHP from S

PF Primary Operationally Achievable with TI SHP from S

PF Primary Operationally Achievable with TI SHP from S

PF Primary Operationally Achievable with TI SHP from S

PF Primary Operationally Achievable with TI SHP from S

PF Primary Operationally Achievable with TI SHP from S

PF Primary Operationally Achievable with TI SHP from S

PF Primary Operationally Achievable with TI SHP from S

PF Primary Operationally Achievable with TI SHP from S

PF Primary Operationally Achievable with TI SHP from S

PF Primary Operationally Achievable with TI SHP from S

PF Primary Operationally Achievable with TI SHP from S

PF Primary Operationally Achievable with TI SHP from S

PF Primary Operationally Achievable with TI SHP from S

PF Primary Operationally Achievable with TI SHP from S

PF Primary Operationally Achievable with TI SHP from S

PF Primary Operationally Achievable with TI SHP from S

PF Primary Operationally Achievable with TI SHP from S

PF Primary Operationally Achievable with TI SHP from S

PF Primary Operationally Achievable with TI SHP from S

PF Primary Operationally Achievable with TI SHP from S

PF Primary Operationally Achievable with TI SHP from S

PF Primary Operationally Achievable with TI SHP from S

PF Primary Operationally Achievable with TI SHP from S

PF Primary Operationally Achievable with TI SHP from S

PF Primary Operationally Achievable with TI SHP from S

PF Primary Operationally Achievable with TI SHP from S

PF Primary Operationally Achievable with TI SHP from S

PF Primary Operationally Achievable with TI SHP from S

PF Primary Operationally Achievable with TI SHP from S

PF Primary Operationally Achievable with TI SHP from S

PF Primary Operationally Achievable with TI SHP from S

PF Primary Operationally Achievable with TI SHP from S

PF Primary Operationally Achievable with TI SHP from S

PF Primary Operationally Achievable with TI SHP from S

PF Primary Operationally Achievable with TI SHP from S

PF Primary Operationally Achievable with TI SHP from S

BW11 FOIA CBP 003270

(b) (7)(E)(b) (7)(E)

(b) (7)(E) (b) (7)(E)

Page 235: From: To: Cc: Subject: FW: TI Presidential Transition (FINAL … · 2019-04-15 · Subject: FW: TI Presidential Transition (FINAL 2).pptx FENCE & ROADS ALCON, Please find attached

PF Primary Operationally Achievable with TI SHP from S

PF Primary Operationally Achievable with TI SHP from S

PF Primary Operationally Achievable with TI SHP from S

PF Primary Operationally Achievable with TI SHP from S

PF Primary Operationally Achievable with TI SHP from S

PF Primary Operationally Achievable with TI SHP from S

PF Primary Operationally Achievable with TI SHP from S

PF Primary Operationally Achievable with TI SHP from S

PF Primary Operationally Achievable with TI SHP from S

PF Primary Operationally Achievable with TI SHP from S

PF Primary Operationally Achievable with TI SHP from S

PF Primary Operationally Achievable with TI SHP from S

PF Primary Operationally Achievable with TI SHP from S

PF Primary Operationally Achievable with TI SHP from S

PF Primary Operationally Achievable with TI SHP from S

PF Primary Operationally Achievable with TI SHP from S

PF Primary Operationally Achievable with TI SHP from S

PF Primary Operationally Achievable with TI SHP from S

PF Primary Operationally Achievable with TI SHP from S

PF Primary Operationally Achievable with TI SHP from S

PF Primary Operationally Achievable with TI SHP from S

PF Primary Operationally Achievable with TI SHP from S

PF Primary Operationally Achievable with TI SHP from S

PF Primary Operationally Achievable with TI SHP from S

PF Primary Operationally Achievable with TI SHP from S

PF Primary Operationally Achievable with TI SHP from S

PF Primary Operationally Achievable with TI SHP from S

PF Primary Operationally Achievable with TI SHP from S

PF Primary Operationally Achievable with TI SHP from S

PF Primary Operationally Achievable with TI SHP from S

PF Primary Operationally Achievable with TI SHP from S

PF Primary Operationally Achievable with TI SHP from S

PF Primary Operationally Achievable with TI SHP from S

PF Primary Operationally Achievable with TI SHP from S

PF Primary Operationally Achievable with TI SHP from S

PF Primary Operationally Achievable with TI SHP from S

PF Primary Operationally Achievable with TI SHP from S

PF Primary Operationally Achievable with TI SHP from S

PF Primary Operationally Achievable with TI SHP from S

PF Primary Operationally Achievable with TI SHP from S

PF Primary Operationally Achievable with TI SHP from S

PF Primary Operationally Achievable with TI SHP from S

PF Primary Operationally Achievable with TI SHP from S

PF Primary Operationally Achievable with TI SHP from S

PF Primary Operationally Achievable with TI SHP from S

PF Primary Operationally Achievable with TI SHP from S

PF Primary Operationally Achievable with TI SHP from S

BW11 FOIA CBP 003271

(b) (7)(E)(b) (7)(E)

(b) (7)(E) (b) (7)(E)

Page 236: From: To: Cc: Subject: FW: TI Presidential Transition (FINAL … · 2019-04-15 · Subject: FW: TI Presidential Transition (FINAL 2).pptx FENCE & ROADS ALCON, Please find attached

PF Primary Operationally Achievable with TI SHP from S

PF Primary Operationally Achievable with TI SHP from S

PF Primary Operationally Achievable with TI SHP from S

PF Primary Operationally Achievable with TI SHP from S

PF Primary Operationally Achievable with TI SHP from S

PF Primary Operationally Achievable with TI SHP from S

PF Primary Operationally Achievable with TI SHP from S

PF Primary Operationally Achievable with TI SHP from S

PF Primary Operationally Achievable with TI SHP from S

PF Primary Operationally Achievable with TI SHP from S

PF Primary Operationally Achievable with TI SHP from S

PF Primary Operationally Achievable with TI SHP from S

PF Primary Operationally Achievable with TI SHP from S

PF Primary Operationally Achievable with TI SHP from S

PF Primary Operationally Achievable with TI SHP from S

PF Primary Operationally Achievable with TI SHP from S

PF Primary Operationally Achievable with TI SHP from S

PF Primary Operationally Achievable with TI SHP from S

PF Primary Operationally Achievable with TI SHP from S

PF Primary Operationally Achievable with TI SHP from S

PF Primary Operationally Achievable with TI SHP from S

PF Primary Operationally Achievable with TI SHP from S

PF Primary Operationally Achievable with TI SHP from S

PF Primary Operationally Achievable with TI SHP from S

PF Primary Operationally Achievable with TI SHP from S

PF Primary Operationally Achievable with TI SHP from S

PF Primary Operationally Achievable with TI SHP from S

PF Primary Operationally Achievable with TI SHP from S

PF Primary Operationally Achievable with TI SHP from S

PF Primary Operationally Achievable with TI SHP from S

PF Primary Operationally Achievable with TI SHP from S

PF Primary Operationally Achievable with TI SHP from S

PF Primary Operationally Achievable with TI SHP from S

PF Primary Operationally Achievable with TI SHP from S

PF Primary Operationally Achievable with TI SHP from S

PF Primary Operationally Achievable with TI SHP from S

PF Primary Operationally Achievable with TI SHP from S

PF Primary Operationally Achievable with TI SHP from S

PF Primary Operationally Achievable with TI SHP from S

PF Primary Operationally Achievable with TI SHP from S

PF Primary Operationally Achievable with TI SHP from S

PF Primary Operationally Achievable with TI SHP from S

PF Primary Operationally Achievable with TI SHP from S

PF Primary Operationally Achievable with TI SHP from S

PF Primary Operationally Achievable with TI SHP from S

PF Primary Operationally Achievable with TI SHP from S

PF Primary Operationally Achievable with TI SHP from S

BW11 FOIA CBP 003272

(b) (7)(E)(b) (7)(E)

(b) (7)(E) (b) (7)(E)

Page 237: From: To: Cc: Subject: FW: TI Presidential Transition (FINAL … · 2019-04-15 · Subject: FW: TI Presidential Transition (FINAL 2).pptx FENCE & ROADS ALCON, Please find attached

PF Primary Operationally Achievable with TI SHP from S

PF Primary Operationally Achievable with TI SHP from S

PF Primary Operationally Achievable with TI SHP from S

PF Primary Operationally Achievable with TI SHP from S

PF Primary Operationally Achievable with TI SHP from S

PF Primary Operationally Achievable with TI SHP from S

PF Primary Operationally Achievable with TI SHP from S

PF Primary Operationally Achievable with TI SHP from S

PF Primary Operationally Achievable with TI SHP from S

PF Primary Operationally Achievable with TI SHP from S

PF Primary Operationally Achievable with TI SHP from S

PF Primary Operationally Achievable with TI SHP from S

PF Primary Operationally Achievable with TI SHP from S

PF Primary Operationally Achievable with TI SHP from S

PF Primary Operationally Achievable with TI SHP from S

PF Primary Operationally Achievable with TI SHP from S

PF Primary Operationally Achievable with TI SHP from S

PF Primary Operationally Achievable with TI SHP from S

PF Primary Operationally Achievable with TI SHP from S

PF Primary Operationally Achievable with TI SHP from S

PF Primary Operationally Achievable with TI SHP from S

PF Primary Operationally Achievable with TI SHP from S

PF Primary Operationally Achievable with TI SHP from S

PF Primary Operationally Achievable with TI SHP from S

PF Primary Operationally Achievable with TI SHP from S

PF Primary Operationally Achievable with TI SHP from S

PF Primary Operationally Achievable with TI SHP from S

PF Primary Operationally Achievable with TI SHP from S

PF Primary Operationally Achievable with TI SHP from S

PF Primary Operationally Achievable with TI SHP from S

PF Primary Operationally Achievable with TI SHP from S

PF Primary Operationally Achievable with TI SHP from S

PF Primary Operationally Achievable with TI SHP from S

PF Primary Operationally Achievable with TI SHP from S

PF Primary Operationally Achievable with TI SHP from S

PF Primary Operationally Achievable with TI SHP from S

PF Primary Operationally Achievable with TI SHP from S

PF Primary Operationally Achievable with TI SHP from S

PF Primary Operationally Achievable with TI SHP from S

PF Primary Operationally Achievable with TI SHP from S

PF Primary Operationally Achievable with TI SHP from S

PF Primary Operationally Achievable with TI SHP from S

PF Primary Operationally Achievable with TI SHP from S

PF Primary Operationally Achievable with TI SHP from S

PF Primary Operationally Achievable with TI SHP from S

PF Primary Operationally Achievable with TI SHP from S

PF Primary Operationally Achievable with TI SHP from S

BW11 FOIA CBP 003273

(b) (7)(E)(b) (7)(E)

(b) (7)(E) (b) (7)(E)

Page 238: From: To: Cc: Subject: FW: TI Presidential Transition (FINAL … · 2019-04-15 · Subject: FW: TI Presidential Transition (FINAL 2).pptx FENCE & ROADS ALCON, Please find attached

PF Primary Operationally Achievable with TI SHP from S

PF Primary Operationally Achievable with TI SHP from S

PF Primary Operationally Achievable with TI SHP from S

PF Primary Operationally Achievable with TI SHP from S

PF Primary Operationally Achievable with TI SHP from S

PF Primary Operationally Achievable with TI SHP from S

PF Primary Operationally Achievable with TI SHP from S

PF Primary Operationally Achievable with TI SHP from S

PF Primary Operationally Achievable with TI SHP from S

PF Primary Operationally Achievable with TI SHP from S

PF Primary Operationally Achievable with TI SHP from S

PF Primary Operationally Achievable with TI SHP from S

PF Primary Operationally Achievable with TI SHP from S

PF Primary Operationally Achievable with TI SHP from S

PF Primary Operationally Achievable with TI SHP from S

PF Primary Operationally Achievable with TI SHP from S

PF Primary Operationally Achievable with TI SHP from S

PF Primary Operationally Achievable with TI SHP from S

PF Primary Operationally Achievable with TI SHP from S

PF Primary Operationally Achievable with TI SHP from S

PF Primary Operationally Achievable with TI SHP from S

PF Primary Operationally Achievable with TI SHP from S

PF Primary Operationally Achievable with TI SHP from S

PF Primary Operationally Achievable with TI SHP from S

PF Primary Operationally Achievable with TI SHP from S

PF Primary Operationally Achievable with TI SHP from S

PF Primary Operationally Achievable with TI SHP from S

PF Primary Operationally Achievable with TI SHP from S

PF Primary Operationally Achievable with TI SHP from S

PF Primary Operationally Achievable with TI SHP from S

PF Primary Operationally Achievable with TI SHP from S

PF Primary Operationally Achievable with TI SHP from S

PF Primary Operationally Achievable with TI SHP from S

PF Primary Operationally Achievable with TI SHP from S

PF Primary Operationally Achievable with TI SHP from S

PF Primary Operationally Achievable with TI SHP from S

PF Primary Operationally Achievable with TI SHP from S

PF Primary Operationally Achievable with TI SHP from S

PF Primary Operationally Achievable with TI SHP from S

PF Primary Operationally Achievable with TI SHP from S

PF Primary Operationally Achievable with TI SHP from S

PF Primary Operationally Achievable with TI SHP from S

PF Primary Operationally Achievable with TI SHP from S

PF Primary Operationally Achievable with TI SHP from S

PF Primary Operationally Achievable with TI SHP from S

PF Primary Operationally Achievable with TI SHP from S

PF Primary Operationally Achievable with TI SHP from S

BW11 FOIA CBP 003274

(b) (7)(E)(b) (7)(E)

(b) (7)(E) (b) (7)(E)

Page 239: From: To: Cc: Subject: FW: TI Presidential Transition (FINAL … · 2019-04-15 · Subject: FW: TI Presidential Transition (FINAL 2).pptx FENCE & ROADS ALCON, Please find attached

PF Primary Operationally Achievable with TI SHP from S

PF Primary Operationally Achievable with TI SHP from S

PF Primary Operationally Achievable with TI SHP from S

PF Primary Operationally Achievable with TI SHP from S

PF Primary Operationally Achievable with TI SHP from S

PF Primary Operationally Achievable with TI SHP from S

PF Primary Operationally Achievable with TI SHP from S

PF Primary Operationally Achievable with TI SHP from S

PF Primary Operationally Achievable with TI SHP from S

PF Primary Operationally Achievable with TI  New Pr

PF Primary Operationally Achievable with TI  New Pr

PF Primary Operationally Achievable with TI  New Pr

PF Primary Operationally Achievable with TI  New Pr

PF Primary Operationally Achievable with TI  New Pr

PF Primary Operationally Achievable with TI  New Pr

PF Primary Operationally Achievable with TI  New Pr

PF Primary Operationally Achievable with TI New Prim

PF Primary Operationally Achievable with TI New Prim

PF Primary Operationally Achievable with TI New Prim

PF Primary Operationally Achievable with TI  New Pr

PF Primary Operationally Achievable with TI  New Pr

PF Primary Operationally Achievable with TI  New Pr

PF Primary Operationally Achievable with TI  New Pr

PF Primary Operationally Achievable with TI  New Pr

PF Primary Operationally Achievable with TI  New Pr

PF Primary Operationally Achievable with TI  New Pr

PF Primary Operationally Achievable with TI  New Pr

PF Primary Operationally Achievable with TI  New Pr

PF Primary Operationally Achievable with TI  New Pr

PF Primary Operationally Achievable with TI  New Pr

PF Primary Operationally Achievable with TI  New Pr

PF Primary Operationally Achievable with TI  New Pr

PF Primary Operationally Achievable with TI  New Pr

PF Primary Operationally Achievable with TI  New Pr

PF Primary Operationally Achievable with TI  New Pr

PF Primary Operationally Achievable with TI  New Pr

PF Primary Operationally Achievable with TI  New P

PF Primary Operationally Achievable with TI  New P

PF Primary Operationally Achievable with TI  New P

PF Primary Operationally Achievable with TI  New P

PF Primary Operationally Achievable with TI  New P

PF Primary Operationally Achievable with TI  New P

PF Primary Operationally Achievable with TI  New P

PF Primary Operationally Achievable with TI  New P

PF Primary Operationally Achievable with TI  New P

PF Primary Operationally Achievable with TI  New P

PF Primary Operationally Achievable with TI  New P

BW11 FOIA CBP 003275

(b) (7)(E)(b) (7)(E)

(b) (7)(E) (b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

Page 240: From: To: Cc: Subject: FW: TI Presidential Transition (FINAL … · 2019-04-15 · Subject: FW: TI Presidential Transition (FINAL 2).pptx FENCE & ROADS ALCON, Please find attached

PF Primary Operationally Achievable with TI  New P

PF Primary Operationally Achievable with TI  New P

PF Primary Operationally Achievable with TI  New P

PF Primary Operationally Achievable with TI  New P

PF Primary Operationally Achievable with TI  New P

PF Primary Operationally Achievable with TI  New P

PF Primary Operationally Achievable with TI  New P

PF Primary Operationally Achievable with TI  New P

PF Primary Operationally Achievable with TI  New P

PF Primary Operationally Achievable with TI  New P

PF Primary Operationally Achievable with TI  New P

PF Primary Operationally Achievable with TI  New P

PF Primary Operationally Achievable with TI  New P

PF Primary Operationally Achievable with TI  New P

PF Primary Operationally Achievable with TI  New P

PF Primary Operationally Achievable with TI  New P

PF Primary Operationally Achievable with TI  New P

PF Primary Operationally Achievable with TI  New P

PF Primary Operationally Achievable with TI  New P

PF Primary Operationally Achievable with TI  New P

PF Primary Operationally Achievable with TI  New P

PF Primary Operationally Achievable with TI  New P

PF Primary Operationally Achievable with TI  New P

PF Primary Operationally Achievable with TI  New P

PF Primary Operationally Achievable with TI  New P

PF Primary Operationally Achievable with TI  New P

PF Primary Operationally Achievable with TI  New P

PF Primary Operationally Achievable with TI  New P

PF Primary Operationally Achievable with TI  New P

PF Primary Operationally Achievable with TI  New P

PF Primary Operationally Achievable with TI  New P

PF Primary Operationally Achievable with TI  New P

PF Primary Operationally Achievable with TI  New P

PF Primary Operationally Achievable with TI  New P

PF Primary Operationally Achievable with TI  New P

PF Primary Operationally Achievable with TI  New Pr

PF Primary Operationally Achievable with TI  New Pr

PF Primary Operationally Achievable with TI  New Pr

PF Primary Operationally Achievable with TI  New Pr

VF Primary Operationally Achievable with TI  New Ve

VF Primary Operationally Achievable with TI  New Ve

Unconst. VF Operationally Achievable with TI  New Ve

PF Primary Operationally Achievable with TI Revised pe

Unconst. PF Operationally Achievable with TI Revised pe

Unconst. PF Operationally Achievable with TI Revised pe

VF to PF VF to PF Revised pe

Unconst. PF Operationally Achievable with TI Revised pe

BW11 FOIA CBP 003276

(b) (7)(E)(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E) (b) (7)(E)(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

Page 241: From: To: Cc: Subject: FW: TI Presidential Transition (FINAL … · 2019-04-15 · Subject: FW: TI Presidential Transition (FINAL 2).pptx FENCE & ROADS ALCON, Please find attached

VF to PF VF to PF Revised pe

Unconst. PF Operationally Achievable with TI Revised pe

VF to PF VF to PF Revised pe

Unconst. PF Operationally Achievable with TI Revised pe

VF to PF VF to PF Revised pe

Unconst. PF Operationally Achievable with TI Revised pe

VF to PF VF to PF Revised pe

Unconst. PF Operationally Achievable with TI Revised pe

PF Primary Operationally Achievable with TI SHP from S

PF Replacement Replacement Fence Revised pe

PF Primary Operationally Achievable with TI Revised pe

PF Replacement Replacement Fence Revised pe

PF Primary Operationally Achievable with TI Revised pe

PF Replacement Replacement Fence Revised pe

PF Primary Operationally Achievable with TI Revised pe

PF Replacement Replacement Fence Revised pe

PF Primary Operationally Achievable with TI Revised pe

VF to PF VF to PF Revised pe

VF to PF VF to PF Revised pe

Unconst. PF Operationally Achievable with TI Revised pe

PF Primary Operationally Achievable with TI Added per 

PF Replacement Replacement Fence Added per 

PF Replacement Replacement Fence Added 1/10

PF Primary Operationally Achievable with TI O‐1

PF Primary Operationally Achievable with TI O‐1

PF Primary Operationally Achievable with TI O‐1

PF Primary Operationally Achievable with TI O‐2

PF Primary Operationally Achievable with TI O‐2

PF Primary Operationally Achievable with TI O‐2

PF Primary Operationally Achievable with TI O‐3

PF Primary Operationally Achievable with TI O‐3

PF Primary Operationally Achievable with TI New Prim

PF Primary Operationally Achievable with TI New Prim

PF Primary Operationally Achievable with TI New Pri

PF Primary Operationally Achievable with TI New P

PF Primary Operationally Achievable with TI New P

PF Primary Operationally Achievable with TI New P

VF Primary Operationally Achievable with TI or  New Ve

VF Primary Operationally Achievable with TI or  Revised pe

VF Primary Operationally Achievable with TI  New V

VF Primary Operationally Achievable with TI  New V

VF Primary Operationally Achievable with TI New Ve

VF Primary Operationally Achievable with TI New V

VF Primary Operationally Achievable with TI New V

PF Primary Operationally Achievable with TI New P

PF Primary Operationally Achievable with TI  New Pr

PF Primary Operationally Achievable with TI New P

BW11 FOIA CBP 003277

(b) (7)(E)(b) (7)(E)

(b) (7)(E) (b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

Page 242: From: To: Cc: Subject: FW: TI Presidential Transition (FINAL … · 2019-04-15 · Subject: FW: TI Presidential Transition (FINAL 2).pptx FENCE & ROADS ALCON, Please find attached

PF Primary Operationally Achievable with TI  New Pr

VF Primary Operationally Achievable with TI  New V

VF Primary Operationally Achievable with TI  New V

VF Primary Operationally Achievable with TI  New V

PF Primary Operationally Achievable with TI  New P

PF Primary Operationally Achievable with TI  New Pr

PF Primary Operationally Achievable with TI New P

VF Primary Operationally Achievable with TI  New Ve

PF Primary Operationally Achievable with TI New P

VF Primary Operationally Achievable with TI New V

VF Primary Operationally Achievable with TI  New 

PF Primary Operationally Achievable with TI New P

PF Primary Operationally Achievable with TI New P

PF Primary Operationally Achievable with TI New P

VF Primary Operationally Achievable with TI New V

VF Primary Operationally Achievable with TI New V

VF Primary Operationally Achievable with TI New V

VF Primary Operationally Achievable with TI New V

PF Primary Operationally Achievable with TI Revised pe

VF Primary Operationally Achievable with TI Revised pe

PF Primary Operationally Achievable with TI or  Revised pe

VF Primary Operationally Achievable with TI or   New 

VF Primary Operationally Achievable with TI  New V

VF Primary Operationally Achievable with TI or  New 

BW11 FOIA CBP 003278

(b) (7)(E) (b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

Page 243: From: To: Cc: Subject: FW: TI Presidential Transition (FINAL … · 2019-04-15 · Subject: FW: TI Presidential Transition (FINAL 2).pptx FENCE & ROADS ALCON, Please find attached

State Sector Station RE_Status ENV_StatusClearance_Stat Constrained * Shape.STLe

Unknown USBP ‐ Big  Unknown ( No No <Null> <Null>

Unknown USBP ‐ Big  Unknown ( No No <Null> <Null>

Unknown USBP ‐ El C Unknown ( Yes Yes Existing ‐ PF <Null>

Unknown USBP ‐ El C Unknown ( Yes Yes Existing ‐ PF <Null>

Unknown USBP ‐ El C Unknown ( Yes Yes Existing ‐ PF <Null>

Unknown USBP ‐ El C Unknown ( Yes Yes Existing ‐ PF <Null>

Unknown USBP ‐ El C Unknown ( Yes Yes Existing ‐ PF <Null>

Unknown USBP ‐ El C Unknown ( Yes Yes Existing ‐ PF <Null>

Unknown USBP ‐ El C Unknown ( Yes Yes Existing ‐ PF <Null>

Unknown USBP ‐ El C Unknown ( Yes Yes Existing ‐ PF <Null>

Unknown USBP ‐ El C Unknown ( Yes Yes Existing ‐ PF <Null>

Unknown USBP ‐ El C Unknown ( Yes Yes Existing ‐ PF <Null>

Unknown USBP ‐ El C Unknown ( Yes Yes Existing ‐ PF <Null>

Unknown USBP ‐ El C Unknown ( Yes Yes <Null> No

Unknown USBP ‐ El C Unknown ( Yes Yes <Null> No

Unknown USBP ‐ El C Unknown ( Yes Yes <Null> No

Unknown USBP ‐ El C Unknown ( Yes Yes <Null> No

Unknown USBP ‐ El C Unknown ( Yes Yes <Null> No

Unknown USBP ‐ El C Unknown ( Yes Yes <Null> No

Unknown USBP ‐ El C Unknown ( Yes Yes <Null> No

Unknown USBP ‐ El C Unknown ( Yes Yes <Null> No

Unknown USBP ‐ El C Unknown ( Yes Yes <Null> No

Unknown USBP ‐ El C Unknown ( Yes Yes <Null> No

Unknown USBP ‐ El C Unknown ( Yes Yes <Null> No

Unknown USBP ‐ El C Unknown ( Yes Yes <Null> No

Unknown USBP ‐ El C Unknown ( Yes Yes <Null> No

Unknown USBP ‐ El C Unknown ( Yes Yes <Null> No

Unknown USBP ‐ El C Unknown ( Yes Yes <Null> No

Unknown USBP ‐ El C Unknown ( Yes Yes <Null> No

Unknown USBP ‐ El C Unknown ( Yes Yes <Null> No

Unknown USBP ‐ El C Unknown ( Yes Yes <Null> No

Unknown USBP ‐ El C Unknown ( Yes Yes <Null> No

Unknown USBP ‐ El C Unknown ( Yes Yes <Null> No

Unknown USBP ‐ El C Unknown ( Yes Yes <Null> No

Unknown USBP ‐ El C Unknown ( Yes Yes <Null> No

Unknown USBP ‐ El C Unknown ( Yes Yes <Null> No

Unknown USBP ‐ El C Unknown ( Yes Yes <Null> No

Unknown USBP ‐ El C Unknown ( Yes Yes <Null> No

Unknown USBP ‐ El C Unknown ( Yes Yes <Null> No

Unknown USBP ‐ El C Unknown ( Yes Yes <Null> No

Unknown USBP ‐ El C Unknown ( Yes Yes <Null> No

Unknown USBP ‐ El C Unknown ( Yes Yes <Null> No

Unknown USBP ‐ El C Unknown ( Yes Yes <Null> No

Unknown USBP ‐ El C Unknown ( Yes Yes <Null> No

Unknown USBP ‐ El C Unknown ( Yes Yes Existing ‐ PF <Null>

Unknown USBP ‐ El C Unknown ( Yes Yes Existing ‐ PF <Null>

BW11 FOIA CBP 003279

(b) (7)(E)

Page 244: From: To: Cc: Subject: FW: TI Presidential Transition (FINAL … · 2019-04-15 · Subject: FW: TI Presidential Transition (FINAL 2).pptx FENCE & ROADS ALCON, Please find attached

Unknown USBP ‐ El C Unknown ( Yes Yes Existing ‐ PF <Null>

Unknown USBP ‐ El C Unknown ( Yes Yes Existing ‐ PF <Null>

Unknown USBP ‐ El C Unknown ( Yes Yes Existing ‐ PF <Null>

Unknown USBP ‐ El C Unknown ( Yes Yes Existing ‐ PF <Null>

Unknown USBP ‐ El C Unknown ( Yes Yes Existing ‐ PF <Null>

Unknown USBP ‐ El C Unknown ( Yes Yes Existing ‐ PF <Null>

Unknown USBP ‐ El C Unknown ( Yes Yes Existing ‐ PF <Null>

Unknown USBP ‐ El C Unknown ( Yes Yes Existing ‐ PF <Null>

Unknown USBP ‐ El C Unknown ( Yes Yes Existing ‐ PF <Null>

Unknown USBP ‐ El C Unknown ( Yes Yes Existing ‐ PF <Null>

Unknown USBP ‐ El C Unknown ( Yes Yes Existing ‐ PF <Null>

Unknown USBP ‐ El C Unknown ( Yes Yes Existing ‐ PF <Null>

Unknown USBP ‐ El C Unknown ( Yes Yes Existing ‐ PF <Null>

Unknown USBP ‐ El C Unknown ( Yes Yes Existing ‐ PF <Null>

Unknown USBP ‐ El C Unknown ( Yes Yes Existing ‐ PF <Null>

Unknown USBP ‐ El C Unknown ( Yes Yes Existing ‐ PF <Null>

Unknown USBP ‐ El C Unknown ( Yes Yes Existing ‐ PF <Null>

Unknown USBP ‐ El C Unknown ( Yes Yes Existing ‐ PF <Null>

Unknown USBP ‐ El C Unknown ( Yes Yes <Null> Yes

Unknown USBP ‐ El C Unknown ( Yes Yes <Null> Yes

Unknown USBP ‐ El C Unknown ( Yes Yes <Null> Yes

Unknown USBP ‐ El C Unknown ( Yes Yes <Null> Yes

Unknown USBP ‐ El C Unknown ( Yes Yes <Null> Yes

Unknown USBP ‐ El C Unknown ( No No <Null> <Null>

Unknown USBP ‐ El C Unknown ( No No <Null> <Null>

Unknown USBP ‐ El C Unknown ( Yes No <Null> <Null>

Unknown USBP ‐ El C Unknown ( No No <Null> <Null>

Unknown USBP ‐ El PaUnknown ( No No <Null> No

Unknown USBP ‐ El PaUnknown ( Yes No <Null> No

Unknown USBP ‐ El PaUnknown ( Yes No <Null> No

Unknown USBP ‐ El PaUnknown ( Yes No <Null> No

Unknown USBP ‐ El PaUnknown ( Yes No <Null> No

Unknown USBP ‐ El PaUnknown ( Yes No <Null> No

Unknown USBP ‐ El PaUnknown ( Yes Yes <Null> No

Unknown USBP ‐ El PaUnknown ( Yes Yes <Null> No

Unknown USBP ‐ El PaUnknown ( Yes Yes <Null> No

Unknown USBP ‐ El PaUnknown ( Yes Yes <Null> No

Unknown USBP ‐ El PaUnknown ( Yes Yes <Null> No

Unknown USBP ‐ El PaUnknown ( No No <Null> <Null>

Unknown USBP ‐ El PaUnknown ( Yes No <Null> <Null>

Unknown USBP ‐ El PaUnknown ( No No <Null> <Null>

Unknown USBP ‐ El PaUnknown ( Yes No <Null> <Null>

Unknown USBP ‐ El PaUnknown ( Yes No <Null> <Null>

Unknown USBP ‐ El PaUnknown ( Yes No <Null> <Null>

Unknown USBP ‐ El PaUnknown ( Yes No <Null> <Null>

Unknown USBP ‐ El PaUnknown ( Yes No <Null> <Null>

Unknown USBP ‐ El PaUnknown ( Yes No <Null> <Null>

BW11 FOIA CBP 003280

(b) (7)(E)

Page 245: From: To: Cc: Subject: FW: TI Presidential Transition (FINAL … · 2019-04-15 · Subject: FW: TI Presidential Transition (FINAL 2).pptx FENCE & ROADS ALCON, Please find attached

Unknown USBP ‐ El PaUnknown ( Yes No <Null> <Null>

Unknown USBP ‐ El PaUnknown ( Yes No <Null> <Null>

Unknown USBP ‐ El PaUnknown ( Yes No <Null> <Null>

Unknown USBP ‐ El PaUnknown ( Yes No <Null> <Null>

Unknown USBP ‐ El PaUnknown ( Yes No <Null> <Null>

Unknown USBP ‐ El PaUnknown ( No No <Null> <Null>

Unknown USBP ‐ El PaUnknown ( Yes No <Null> <Null>

Unknown USBP ‐ El PaUnknown ( No No <Null> <Null>

Unknown USBP ‐ El PaUnknown ( Yes No <Null> <Null>

Unknown USBP ‐ El PaUnknown ( No No <Null> <Null>

Unknown USBP ‐ El PaUnknown ( Yes No <Null> <Null>

Unknown USBP ‐ El PaUnknown ( No No <Null> <Null>

Unknown USBP ‐ El PaUnknown ( Yes No <Null> <Null>

Unknown USBP ‐ El PaUnknown ( No No <Null> <Null>

Unknown USBP ‐ El PaUnknown ( Yes No <Null> <Null>

Unknown USBP ‐ El PaUnknown ( No No <Null> <Null>

Unknown USBP ‐ El PaUnknown ( Yes No <Null> <Null>

Unknown USBP ‐ El PaUnknown ( No No <Null> <Null>

Unknown USBP ‐ El PaUnknown ( Yes No <Null> <Null>

Unknown USBP ‐ El PaUnknown ( No No <Null> <Null>

Unknown USBP ‐ El PaUnknown ( Yes No <Null> <Null>

Unknown USBP ‐ El PaUnknown ( No No <Null> <Null>

Unknown USBP ‐ El PaUnknown ( Yes No <Null> <Null>

Unknown USBP ‐ El PaUnknown ( No No <Null> <Null>

Unknown USBP ‐ El PaUnknown ( Yes No <Null> <Null>

Unknown USBP ‐ El PaUnknown ( No No <Null> <Null>

Unknown USBP ‐ El PaUnknown ( Yes No <Null> <Null>

Unknown USBP ‐ El PaUnknown ( No No <Null> <Null>

Unknown USBP ‐ El PaUnknown ( Yes No <Null> <Null>

Unknown USBP ‐ El PaUnknown ( No No <Null> <Null>

Unknown USBP ‐ El PaUnknown ( Yes No <Null> <Null>

Unknown USBP ‐ El PaUnknown ( No No <Null> <Null>

Unknown USBP ‐ El PaUnknown ( Yes No <Null> <Null>

Unknown USBP ‐ El PaUnknown ( No No <Null> <Null>

Unknown USBP ‐ El PaUnknown ( Yes No <Null> <Null>

Unknown USBP ‐ El PaUnknown ( No No <Null> <Null>

Unknown USBP ‐ El PaUnknown ( Yes No <Null> <Null>

Unknown USBP ‐ El PaUnknown ( Yes No <Null> <Null>

Unknown USBP ‐ El PaUnknown ( Yes No <Null> <Null>

Unknown USBP ‐ El PaUnknown ( Yes No <Null> <Null>

Unknown USBP ‐ El PaUnknown ( Yes No <Null> <Null>

Unknown USBP ‐ El PaUnknown ( Yes No <Null> <Null>

Unknown USBP ‐ El PaUnknown ( Yes No <Null> <Null>

Unknown USBP ‐ El PaUnknown ( Yes No <Null> <Null>

Unknown USBP ‐ El PaUnknown ( Yes No <Null> <Null>

Unknown USBP ‐ El PaUnknown ( Yes No <Null> <Null>

Unknown USBP ‐ El PaUnknown ( Yes No <Null> <Null>

BW11 FOIA CBP 003281

(b) (7)(E)

EZAISA6
Sticky Note
None set by EZAISA6
EZAISA6
Sticky Note
MigrationNone set by EZAISA6
EZAISA6
Sticky Note
Unmarked set by EZAISA6
Page 246: From: To: Cc: Subject: FW: TI Presidential Transition (FINAL … · 2019-04-15 · Subject: FW: TI Presidential Transition (FINAL 2).pptx FENCE & ROADS ALCON, Please find attached

Unknown USBP ‐ El PaUnknown ( Yes No <Null> <Null>

Unknown USBP ‐ El PaUnknown ( Yes No <Null> <Null>

Unknown USBP ‐ El PaUnknown ( No No <Null> <Null>

Unknown USBP ‐ El PaUnknown ( Yes No <Null> <Null>

Unknown USBP ‐ El PaUnknown ( No No <Null> <Null>

Unknown USBP ‐ El PaUnknown ( Yes No <Null> <Null>

Unknown USBP ‐ El PaUnknown ( No No <Null> <Null>

Unknown USBP ‐ El PaUnknown ( Yes No <Null> <Null>

Unknown USBP ‐ El PaUnknown ( No No <Null> <Null>

Unknown USBP ‐ El PaUnknown ( Yes No <Null> <Null>

Unknown USBP ‐ El PaUnknown ( Yes No <Null> <Null>

Unknown USBP ‐ El PaUnknown ( Yes No <Null> <Null>

Unknown USBP ‐ El PaUnknown ( Yes No <Null> <Null>

Unknown USBP ‐ El PaUnknown ( Yes No <Null> <Null>

Unknown USBP ‐ El PaUnknown ( Yes No <Null> <Null>

Unknown USBP ‐ El PaUnknown ( Yes No <Null> <Null>

Unknown USBP ‐ El PaUnknown ( Yes No <Null> <Null>

Unknown USBP ‐ El PaUnknown ( Yes No <Null> <Null>

Unknown USBP ‐ El PaUnknown ( Yes No <Null> <Null>

Unknown USBP ‐ El PaUnknown ( No No <Null> <Null>

Unknown USBP ‐ El PaUnknown ( Yes No <Null> <Null>

Unknown USBP ‐ El PaUnknown ( No No <Null> <Null>

Unknown USBP ‐ El PaUnknown ( Yes No <Null> <Null>

Unknown USBP ‐ El PaUnknown ( No No <Null> <Null>

Unknown USBP ‐ El PaUnknown ( Yes No <Null> <Null>

Unknown USBP ‐ El PaUnknown ( No No <Null> <Null>

Unknown USBP ‐ El PaUnknown ( Yes No <Null> <Null>

Unknown USBP ‐ El PaUnknown ( No No <Null> <Null>

Unknown USBP ‐ El PaUnknown ( Yes No <Null> <Null>

Unknown USBP ‐ El PaUnknown ( No No <Null> <Null>

Unknown USBP ‐ El PaUnknown ( Yes No <Null> <Null>

Unknown USBP ‐ El PaUnknown ( No No <Null> <Null>

Unknown USBP ‐ El PaUnknown ( Yes No <Null> <Null>

Unknown USBP ‐ El PaUnknown ( No No <Null> <Null>

Unknown USBP ‐ El PaUnknown ( Yes No <Null> <Null>

Unknown USBP ‐ El PaUnknown ( Yes No <Null> <Null>

Unknown USBP ‐ El PaUnknown ( Yes No <Null> <Null>

Unknown USBP ‐ El PaUnknown ( No No <Null> <Null>

Unknown USBP ‐ El PaUnknown ( Yes No <Null> <Null>

Unknown USBP ‐ El PaUnknown ( No No <Null> <Null>

Unknown USBP ‐ El PaUnknown ( Yes No <Null> <Null>

Unknown USBP ‐ El PaUnknown ( No No <Null> <Null>

Unknown USBP ‐ El PaUnknown ( Yes No <Null> <Null>

Unknown USBP ‐ El PaUnknown ( No No <Null> <Null>

Unknown USBP ‐ El PaUnknown ( Yes No <Null> <Null>

Unknown USBP ‐ El PaUnknown ( No No <Null> <Null>

Unknown USBP ‐ El PaUnknown ( Yes No <Null> <Null>

BW11 FOIA CBP 003282

(b) (7)(E)

EZAISA6
Sticky Note
None set by EZAISA6
EZAISA6
Sticky Note
MigrationNone set by EZAISA6
EZAISA6
Sticky Note
Unmarked set by EZAISA6
Page 247: From: To: Cc: Subject: FW: TI Presidential Transition (FINAL … · 2019-04-15 · Subject: FW: TI Presidential Transition (FINAL 2).pptx FENCE & ROADS ALCON, Please find attached

Unknown USBP ‐ El PaUnknown ( Yes No <Null> <Null>

Unknown USBP ‐ El PaUnknown ( No No <Null> <Null>

Unknown USBP ‐ El PaUnknown ( No No <Null> <Null>

Unknown USBP ‐ El PaUnknown ( Yes No <Null> <Null>

Unknown USBP ‐ El PaUnknown ( No No <Null> <Null>

Unknown USBP ‐ El PaUnknown ( Yes No <Null> <Null>

Unknown USBP ‐ El PaUnknown ( No No <Null> <Null>

Unknown USBP ‐ El PaUnknown ( Yes No <Null> <Null>

Unknown USBP ‐ El PaUnknown ( No No <Null> <Null>

Unknown USBP ‐ El PaUnknown ( Yes No <Null> <Null>

Unknown USBP ‐ El PaUnknown ( No No <Null> <Null>

Unknown USBP ‐ El PaUnknown ( Yes No <Null> <Null>

Unknown USBP ‐ El PaUnknown ( No No <Null> <Null>

Unknown USBP ‐ El PaUnknown ( Yes No <Null> <Null>

Unknown USBP ‐ El PaUnknown ( No No <Null> <Null>

Unknown USBP ‐ El PaUnknown ( Yes No <Null> <Null>

Unknown USBP ‐ El PaUnknown ( No No <Null> <Null>

Unknown USBP ‐ El PaUnknown ( Yes No <Null> <Null>

Unknown USBP ‐ El PaUnknown ( No No <Null> <Null>

Unknown USBP ‐ El PaUnknown ( Yes No <Null> <Null>

Unknown USBP ‐ El PaUnknown ( No No <Null> <Null>

Unknown USBP ‐ El PaUnknown ( Yes No <Null> <Null>

Unknown USBP ‐ El PaUnknown ( No No <Null> <Null>

Unknown USBP ‐ El PaUnknown ( Yes No <Null> <Null>

Unknown USBP ‐ El PaUnknown ( No No <Null> <Null>

Unknown USBP ‐ El PaUnknown ( Yes No <Null> <Null>

Unknown USBP ‐ El PaUnknown ( No No <Null> <Null>

Unknown USBP ‐ El PaUnknown ( Yes No <Null> <Null>

Unknown USBP ‐ El PaUnknown ( No No <Null> <Null>

Unknown USBP ‐ El PaUnknown ( Yes No <Null> <Null>

Unknown USBP ‐ El PaUnknown ( No No <Null> <Null>

Unknown USBP ‐ El PaUnknown ( Yes No <Null> <Null>

Unknown USBP ‐ El PaUnknown ( No No <Null> <Null>

Unknown USBP ‐ El PaUnknown ( Yes No <Null> <Null>

Unknown USBP ‐ El PaUnknown ( No No <Null> <Null>

Unknown USBP ‐ El PaUnknown ( Yes No <Null> <Null>

Unknown USBP ‐ El PaUnknown ( No No <Null> <Null>

Unknown USBP ‐ El PaUnknown ( Yes No <Null> <Null>

Unknown USBP ‐ El PaUnknown ( No No <Null> <Null>

Unknown USBP ‐ El PaUnknown ( Yes No <Null> <Null>

Unknown USBP ‐ El PaUnknown ( No No <Null> <Null>

Unknown USBP ‐ El PaUnknown ( Yes No <Null> <Null>

Unknown USBP ‐ El PaUnknown ( No No <Null> <Null>

Unknown USBP ‐ El PaUnknown ( Yes No <Null> <Null>

Unknown USBP ‐ El PaUnknown ( No No <Null> <Null>

Unknown USBP ‐ El PaUnknown ( Yes No <Null> <Null>

Unknown USBP ‐ El PaUnknown ( No No <Null> <Null>

BW11 FOIA CBP 003283

(b) (7)(E)

EZAISA6
Sticky Note
None set by EZAISA6
EZAISA6
Sticky Note
MigrationNone set by EZAISA6
EZAISA6
Sticky Note
Unmarked set by EZAISA6
Page 248: From: To: Cc: Subject: FW: TI Presidential Transition (FINAL … · 2019-04-15 · Subject: FW: TI Presidential Transition (FINAL 2).pptx FENCE & ROADS ALCON, Please find attached

Unknown USBP ‐ El PaUnknown ( Yes No <Null> <Null>

Unknown USBP ‐ El PaUnknown ( No No <Null> <Null>

Unknown USBP ‐ El PaUnknown ( Yes No <Null> <Null>

Unknown USBP ‐ El PaUnknown ( No No <Null> <Null>

Unknown USBP ‐ El PaUnknown ( Yes No <Null> <Null>

Unknown USBP ‐ El PaUnknown ( No No <Null> <Null>

Unknown USBP ‐ El PaUnknown ( Yes No <Null> <Null>

Unknown USBP ‐ El PaUnknown ( No No <Null> <Null>

Unknown USBP ‐ El PaUnknown ( Yes No <Null> <Null>

Unknown USBP ‐ El PaUnknown ( No No <Null> <Null>

Unknown USBP ‐ El PaUnknown ( Yes No <Null> <Null>

Unknown USBP ‐ El PaUnknown ( No No <Null> <Null>

Unknown USBP ‐ El PaUnknown ( Yes No <Null> <Null>

Unknown USBP ‐ El PaUnknown ( No No <Null> <Null>

Unknown USBP ‐ El PaUnknown ( Yes No <Null> <Null>

Unknown USBP ‐ El PaUnknown ( No No <Null> <Null>

Unknown USBP ‐ El PaUnknown ( Yes No <Null> <Null>

Unknown USBP ‐ El PaUnknown ( No No <Null> <Null>

Unknown USBP ‐ El PaUnknown ( Yes No <Null> <Null>

Unknown USBP ‐ El PaUnknown ( No No <Null> <Null>

Unknown USBP ‐ El PaUnknown ( Yes No <Null> <Null>

Unknown USBP ‐ El PaUnknown ( No No <Null> <Null>

Unknown USBP ‐ El PaUnknown ( Yes No <Null> <Null>

Unknown USBP ‐ El PaUnknown ( No No <Null> <Null>

Unknown USBP ‐ El PaUnknown ( Yes No <Null> <Null>

Unknown USBP ‐ El PaUnknown ( No No <Null> <Null>

Unknown USBP ‐ El PaUnknown ( Yes No <Null> <Null>

Unknown USBP ‐ El PaUnknown ( No No <Null> <Null>

Unknown USBP ‐ El PaUnknown ( Yes No <Null> <Null>

Unknown USBP ‐ El PaUnknown ( No No <Null> <Null>

Unknown USBP ‐ El PaUnknown ( Yes No <Null> <Null>

Unknown USBP ‐ El PaUnknown ( No No <Null> <Null>

Unknown USBP ‐ El PaUnknown ( Yes No <Null> <Null>

Unknown USBP ‐ El PaUnknown ( No No <Null> <Null>

Unknown USBP ‐ El PaUnknown ( Yes No <Null> <Null>

Unknown USBP ‐ El PaUnknown ( No No <Null> <Null>

Unknown USBP ‐ El PaUnknown ( Yes No <Null> <Null>

Unknown USBP ‐ El PaUnknown ( No No <Null> <Null>

Unknown USBP ‐ El PaUnknown ( Yes No <Null> <Null>

Unknown USBP ‐ El PaUnknown ( No No <Null> <Null>

Unknown USBP ‐ El PaUnknown ( Yes No <Null> <Null>

Unknown USBP ‐ El PaUnknown ( No No <Null> <Null>

Unknown USBP ‐ El PaUnknown ( Yes No <Null> <Null>

Unknown USBP ‐ El PaUnknown ( No No <Null> <Null>

Unknown USBP ‐ El PaUnknown ( Yes No <Null> <Null>

Unknown USBP ‐ El PaUnknown ( No No <Null> <Null>

Unknown USBP ‐ El PaUnknown ( Yes No <Null> <Null>

BW11 FOIA CBP 003284

(b) (7)(E)

EZAISA6
Sticky Note
None set by EZAISA6
EZAISA6
Sticky Note
MigrationNone set by EZAISA6
EZAISA6
Sticky Note
Unmarked set by EZAISA6
Page 249: From: To: Cc: Subject: FW: TI Presidential Transition (FINAL … · 2019-04-15 · Subject: FW: TI Presidential Transition (FINAL 2).pptx FENCE & ROADS ALCON, Please find attached

Unknown USBP ‐ El PaUnknown ( No No <Null> <Null>

Unknown USBP ‐ El PaUnknown ( Yes No <Null> <Null>

Unknown USBP ‐ El PaUnknown ( No No <Null> <Null>

Unknown USBP ‐ El PaUnknown ( Yes No <Null> <Null>

Unknown USBP ‐ El PaUnknown ( No No <Null> <Null>

Unknown USBP ‐ El PaUnknown ( Yes No <Null> <Null>

Unknown USBP ‐ El PaUnknown ( No No <Null> <Null>

Unknown USBP ‐ El PaUnknown ( Yes No <Null> <Null>

Unknown USBP ‐ El PaUnknown ( No No <Null> <Null>

Unknown USBP ‐ El PaUnknown ( Yes No <Null> <Null>

Unknown USBP ‐ El PaUnknown ( No No <Null> <Null>

Unknown USBP ‐ El PaUnknown ( Yes No <Null> <Null>

Unknown USBP ‐ El PaUnknown ( No No <Null> <Null>

Unknown USBP ‐ El PaUnknown ( Yes No <Null> <Null>

Unknown USBP ‐ El PaUnknown ( No No <Null> <Null>

Unknown USBP ‐ El PaUnknown ( Yes No <Null> <Null>

Unknown USBP ‐ El PaUnknown ( No No <Null> <Null>

Unknown USBP ‐ El PaUnknown ( Yes No <Null> <Null>

Unknown USBP ‐ El PaUnknown ( No No <Null> <Null>

Unknown USBP ‐ El PaUnknown ( Yes No <Null> <Null>

Unknown USBP ‐ El PaUnknown ( No No <Null> <Null>

Unknown USBP ‐ El PaUnknown ( Yes No <Null> <Null>

Unknown USBP ‐ El PaUnknown ( No No <Null> <Null>

Unknown USBP ‐ El PaUnknown ( Yes No <Null> <Null>

Unknown USBP ‐ El PaUnknown ( No No <Null> <Null>

Unknown USBP ‐ El PaUnknown ( Yes No <Null> <Null>

Unknown USBP ‐ El PaUnknown ( No No <Null> <Null>

Unknown USBP ‐ El PaUnknown ( Yes No <Null> <Null>

Unknown USBP ‐ El PaUnknown ( No No <Null> <Null>

Unknown USBP ‐ El PaUnknown ( Yes No <Null> <Null>

Unknown USBP ‐ El PaUnknown ( No No <Null> <Null>

Unknown USBP ‐ El PaUnknown ( Yes No <Null> <Null>

Unknown USBP ‐ El PaUnknown ( No No <Null> <Null>

Unknown USBP ‐ El PaUnknown ( Yes No <Null> <Null>

Unknown USBP ‐ El PaUnknown ( No No <Null> <Null>

Unknown USBP ‐ El PaUnknown ( Yes No <Null> <Null>

Unknown USBP ‐ El PaUnknown ( No No <Null> <Null>

Unknown USBP ‐ El PaUnknown ( Yes No <Null> <Null>

Unknown USBP ‐ El PaUnknown ( No No <Null> <Null>

Unknown USBP ‐ El PaUnknown ( Yes No <Null> <Null>

Unknown USBP ‐ El PaUnknown ( No No <Null> <Null>

Unknown USBP ‐ El PaUnknown ( Yes No <Null> <Null>

Unknown USBP ‐ El PaUnknown ( No No <Null> <Null>

Unknown USBP ‐ El PaUnknown ( Yes No <Null> <Null>

Unknown USBP ‐ El PaUnknown ( No No <Null> <Null>

Unknown USBP ‐ El PaUnknown ( Yes No <Null> <Null>

Unknown USBP ‐ El PaUnknown ( No No <Null> No

BW11 FOIA CBP 003285

(b) (7)(E)

EZAISA6
Sticky Note
None set by EZAISA6
EZAISA6
Sticky Note
MigrationNone set by EZAISA6
EZAISA6
Sticky Note
Unmarked set by EZAISA6
Page 250: From: To: Cc: Subject: FW: TI Presidential Transition (FINAL … · 2019-04-15 · Subject: FW: TI Presidential Transition (FINAL 2).pptx FENCE & ROADS ALCON, Please find attached

Unknown USBP ‐ El PaUnknown ( Yes No <Null> No

Unknown USBP ‐ El PaUnknown ( Yes No <Null> <Null>

Unknown USBP ‐ El PaUnknown ( No No <Null> <Null>

Unknown USBP ‐ El PaUnknown ( No No <Null> <Null>

Unknown USBP ‐ El PaUnknown ( Yes No <Null> <Null>

Unknown USBP ‐ El PaUnknown ( No No <Null> <Null>

Unknown USBP ‐ El PaUnknown ( Yes No <Null> <Null>

Unknown USBP ‐ El PaUnknown ( Yes Yes <Null> Yes

Unknown USBP ‐ El PaUnknown ( Yes Yes <Null> Yes

Unknown USBP ‐ El PaUnknown ( Yes Yes <Null> Yes

Unknown USBP ‐ El PaUnknown ( Yes Yes <Null> Yes

Unknown USBP ‐ El PaUnknown ( Yes Yes <Null> Yes

Unknown USBP ‐ El PaUnknown ( Yes Yes <Null> Yes

Unknown USBP ‐ El PaUnknown ( Yes Yes <Null> Yes

Unknown USBP ‐ El PaUnknown ( Yes Yes <Null> Yes

Unknown USBP ‐ El PaUnknown ( Yes Yes <Null> Yes

Unknown USBP ‐ El PaUnknown ( Yes Yes <Null> Yes

Unknown USBP ‐ El PaUnknown ( Yes Yes <Null> Yes

Unknown USBP ‐ El PaUnknown ( Yes Yes <Null> Yes

Unknown USBP ‐ El PaUnknown ( Yes Yes <Null> Yes

Unknown USBP ‐ El PaUnknown ( Yes Yes <Null> Yes

Unknown USBP ‐ El PaUnknown ( Yes Yes <Null> Yes

Unknown USBP ‐ El PaUnknown ( Yes Yes <Null> Yes

Unknown USBP ‐ El PaUnknown ( Yes Yes <Null> Yes

Unknown USBP ‐ El PaUnknown ( Yes Yes <Null> Yes

Unknown USBP ‐ El PaUnknown ( Yes Yes <Null> Yes

Unknown USBP ‐ El PaUnknown ( Yes Yes <Null> Yes

Unknown USBP ‐ El PaUnknown ( Yes Yes <Null> Yes

Unknown USBP ‐ El PaUnknown ( Yes No <Null> <Null>

Unknown USBP ‐ El PaUnknown ( Yes Yes <Null> <Null>

Unknown USBP ‐ El PaUnknown ( Yes Yes <Null> <Null>

Unknown USBP ‐ El PaUnknown ( Yes Yes <Null> <Null>

Unknown USBP ‐ El PaUnknown ( Yes Yes <Null> <Null>

Unknown USBP ‐ El PaUnknown ( Yes Yes <Null> <Null>

Unknown USBP ‐ El PaUnknown ( Yes Yes <Null> <Null>

Unknown USBP ‐ El PaUnknown ( Yes Yes <Null> <Null>

Unknown USBP ‐ El PaUnknown ( Yes Yes <Null> <Null>

Unknown USBP ‐ El PaUnknown ( Yes Yes <Null> <Null>

Unknown USBP ‐ El PaUnknown ( Yes Yes <Null> <Null>

Unknown USBP ‐ El PaUnknown ( Yes Yes <Null> <Null>

Unknown USBP ‐ El PaUnknown ( Yes Yes <Null> <Null>

Unknown USBP ‐ El PaUnknown ( Yes Yes <Null> <Null>

Unknown USBP ‐ El PaUnknown ( Yes Yes <Null> <Null>

Unknown USBP ‐ El PaUnknown ( Yes Yes <Null> <Null>

Unknown USBP ‐ El PaUnknown ( Yes Yes <Null> <Null>

Unknown USBP ‐ El PaUnknown ( Yes Yes <Null> <Null>

Unknown USBP ‐ El PaUnknown ( Yes Yes <Null> <Null>

BW11 FOIA CBP 003286

(b) (7)(E)

EZAISA6
Sticky Note
None set by EZAISA6
EZAISA6
Sticky Note
MigrationNone set by EZAISA6
EZAISA6
Sticky Note
Unmarked set by EZAISA6
Page 251: From: To: Cc: Subject: FW: TI Presidential Transition (FINAL … · 2019-04-15 · Subject: FW: TI Presidential Transition (FINAL 2).pptx FENCE & ROADS ALCON, Please find attached

Unknown USBP ‐ El PaUnknown ( Yes Yes <Null> <Null>

Unknown USBP ‐ El PaUnknown ( Yes Yes <Null> <Null>

Unknown USBP ‐ El PaUnknown ( Yes Yes <Null> <Null>

Unknown USBP ‐ El PaUnknown ( Yes Yes <Null> <Null>

Unknown USBP ‐ El PaUnknown ( Yes Yes <Null> <Null>

Unknown USBP ‐ El PaUnknown ( Yes Yes <Null> <Null>

Unknown USBP ‐ El PaUnknown ( Yes Yes <Null> <Null>

Unknown USBP ‐ El PaUnknown ( Yes Yes <Null> <Null>

Unknown USBP ‐ El PaUnknown ( Yes Yes <Null> <Null>

Unknown USBP ‐ El PaUnknown ( Yes Yes <Null> <Null>

Unknown USBP ‐ El PaUnknown ( Yes Yes <Null> <Null>

Unknown USBP ‐ El PaUnknown ( Yes Yes <Null> <Null>

Unknown USBP ‐ El PaUnknown ( Yes Yes <Null> <Null>

Unknown USBP ‐ El PaUnknown ( Yes Yes <Null> <Null>

Unknown USBP ‐ El PaUnknown ( Yes Yes <Null> <Null>

Unknown USBP ‐ El PaUnknown ( Yes Yes <Null> <Null>

Unknown USBP ‐ El PaUnknown ( Yes Yes <Null> <Null>

Unknown USBP ‐ El PaUnknown ( Yes Yes <Null> <Null>

Unknown USBP ‐ El PaUnknown ( Yes Yes <Null> <Null>

Unknown USBP ‐ El PaUnknown ( Yes No <Null> <Null>

Unknown USBP ‐ El PaUnknown ( Yes No <Null> <Null>

Unknown USBP ‐ El PaUnknown ( Yes No <Null> <Null>

Unknown USBP ‐ El PaUnknown ( Yes No <Null> <Null>

Unknown USBP ‐ El PaUnknown ( Yes No <Null> <Null>

Unknown USBP ‐ El PaUnknown ( Yes Yes <Null> <Null>

Unknown USBP ‐ El PaUnknown ( Yes Yes <Null> <Null>

Unknown USBP ‐ El PaUnknown ( Yes Yes <Null> <Null>

Unknown USBP ‐ El PaUnknown ( Yes Yes <Null> <Null>

Unknown USBP ‐ El PaUnknown ( Yes Yes <Null> <Null>

Unknown USBP ‐ El PaUnknown ( Yes Yes <Null> <Null>

Unknown USBP ‐ El PaUnknown ( Yes Yes <Null> <Null>

Unknown USBP ‐ El PaUnknown ( Yes Yes <Null> <Null>

Unknown USBP ‐ El PaUnknown ( Yes Yes <Null> <Null>

Unknown USBP ‐ El PaUnknown ( Yes Yes <Null> <Null>

Unknown USBP ‐ El PaUnknown ( Yes Yes <Null> <Null>

Unknown USBP ‐ El PaUnknown ( Yes Yes <Null> <Null>

Unknown USBP ‐ El PaUnknown ( Yes Yes <Null> <Null>

Unknown USBP ‐ El PaUnknown ( Yes Yes <Null> <Null>

Unknown USBP ‐ El PaUnknown ( Yes Yes <Null> <Null>

Unknown USBP ‐ El PaUnknown ( Yes Yes <Null> <Null>

Unknown USBP ‐ El PaUnknown ( Yes Yes <Null> <Null>

Unknown USBP ‐ El PaUnknown ( Yes Yes <Null> <Null>

Unknown USBP ‐ LareUnknown ( No No <Null> <Null>

Unknown USBP ‐ LareUnknown ( No No <Null> <Null>

Unknown USBP ‐ LareUnknown ( Yes No <Null> <Null>

Unknown USBP ‐ LareUnknown ( No No <Null> <Null>

Unknown USBP ‐ LareUnknown ( Yes No <Null> <Null>

BW11 FOIA CBP 003287

(b) (7)(E)

EZAISA6
Sticky Note
None set by EZAISA6
EZAISA6
Sticky Note
MigrationNone set by EZAISA6
EZAISA6
Sticky Note
Unmarked set by EZAISA6
Page 252: From: To: Cc: Subject: FW: TI Presidential Transition (FINAL … · 2019-04-15 · Subject: FW: TI Presidential Transition (FINAL 2).pptx FENCE & ROADS ALCON, Please find attached

Unknown USBP ‐ LareUnknown ( No No <Null> <Null>

Unknown USBP ‐ LareUnknown ( No No <Null> <Null>

Unknown USBP ‐ LareUnknown ( No No <Null> <Null>

Unknown USBP ‐ LareUnknown ( No No <Null> <Null>

Unknown USBP ‐ LareUnknown ( No No <Null> <Null>

Unknown USBP ‐ LareUnknown ( No No <Null> <Null>

Unknown USBP ‐ LareUnknown ( No No <Null> <Null>

Unknown USBP ‐ LareUnknown ( Yes No <Null> <Null>

Unknown USBP ‐ LareUnknown ( No No <Null> <Null>

Unknown USBP ‐ LareUnknown ( No No Cleared by Prim<Null>

Unknown USBP ‐ LareUnknown ( No No Cleared by Prim<Null>

Unknown USBP ‐ LareUnknown ( No No Cleared by Prim<Null>

Unknown USBP ‐ LareUnknown ( Yes No Cleared by Prim<Null>

Unknown USBP ‐ LareUnknown ( Yes Yes Cleared by Prim<Null>

Unknown USBP ‐ LareUnknown ( Yes No Cleared by Prim<Null>

Unknown USBP ‐ LareUnknown ( Yes No <Null> <Null>

Unknown USBP ‐ LareUnknown ( No No <Null> <Null>

Unknown USBP ‐ LareUnknown ( No No Cleared by Prim<Null>

Unknown USBP ‐ LareUnknown ( No No Cleared by Prim<Null>

Unknown USBP ‐ LareUnknown ( No No Cleared by Prim<Null>

Unknown USBP ‐ LareUnknown ( No No Cleared by Prim<Null>

Unknown USBP ‐ LareUnknown ( No No Cleared by Prim<Null>

Unknown USBP ‐ LareUnknown ( No No Cleared by Prim<Null>

Unknown USBP ‐ LareUnknown ( Yes No <Null> <Null>

Unknown USBP ‐ LareUnknown ( No No <Null> <Null>

Unknown USBP ‐ Rio  Unknown ( Yes No <Null> <Null>

Unknown USBP ‐ Rio  Unknown ( Yes No <Null> <Null>

Unknown USBP ‐ Rio  Unknown ( Yes No <Null> <Null>

Unknown USBP ‐ Rio  Unknown ( Yes No <Null> <Null>

Unknown USBP ‐ Rio  Unknown ( No No <Null> <Null>

Unknown USBP ‐ Rio  Unknown ( No No <Null> <Null>

Unknown USBP ‐ Rio  Unknown ( Yes No <Null> <Null>

Unknown USBP ‐ Rio  Unknown ( Yes No <Null> <Null>

Unknown USBP ‐ Rio  Unknown ( Yes No <Null> <Null>

Unknown USBP ‐ Rio  Unknown ( Yes No <Null> <Null>

Unknown USBP ‐ Rio  Unknown ( No No <Null> <Null>

Unknown USBP ‐ Rio  Unknown ( Yes No <Null> <Null>

Unknown USBP ‐ Rio  Unknown ( No No <Null> <Null>

Unknown USBP ‐ Rio  Unknown ( Yes No <Null> <Null>

Unknown USBP ‐ Rio  Unknown ( No No <Null> <Null>

Unknown USBP ‐ Rio  Unknown ( Yes No <Null> <Null>

Unknown USBP ‐ Rio  Unknown ( Yes No <Null> <Null>

Unknown USBP ‐ Rio  Unknown ( Yes No <Null> <Null>

Unknown USBP ‐ Rio  Unknown ( No No <Null> <Null>

Unknown USBP ‐ Rio  Unknown ( Yes No <Null> <Null>

Unknown USBP ‐ Rio  Unknown ( No No <Null> <Null>

Unknown USBP ‐ Rio  Unknown ( No No <Null> <Null>

BW11 FOIA CBP 003288

(b) (7)(E)

EZAISA6
Sticky Note
None set by EZAISA6
EZAISA6
Sticky Note
MigrationNone set by EZAISA6
EZAISA6
Sticky Note
Unmarked set by EZAISA6
Page 253: From: To: Cc: Subject: FW: TI Presidential Transition (FINAL … · 2019-04-15 · Subject: FW: TI Presidential Transition (FINAL 2).pptx FENCE & ROADS ALCON, Please find attached

Unknown USBP ‐ Rio  Unknown ( Yes No <Null> <Null>

Unknown USBP ‐ Rio  Unknown ( Yes No <Null> <Null>

Unknown USBP ‐ Rio  Unknown ( No No <Null> <Null>

Unknown USBP ‐ Rio  Unknown ( Yes No <Null> <Null>

Unknown USBP ‐ Rio  Unknown ( Yes No <Null> <Null>

Unknown USBP ‐ Rio  Unknown ( Yes No <Null> <Null>

Unknown USBP ‐ Rio  Unknown ( No No <Null> <Null>

Unknown USBP ‐ Rio  Unknown ( No No <Null> <Null>

Unknown USBP ‐ Rio  Unknown ( Yes No <Null> <Null>

Unknown USBP ‐ Rio  Unknown ( No No <Null> <Null>

Unknown USBP ‐ Rio  Unknown ( Yes No <Null> <Null>

Unknown USBP ‐ Rio  Unknown ( No No <Null> <Null>

Unknown USBP ‐ Rio  Unknown ( Yes No <Null> <Null>

Unknown USBP ‐ Rio  Unknown ( Yes No <Null> <Null>

Unknown USBP ‐ Rio  Unknown ( Yes No <Null> <Null>

Unknown USBP ‐ Rio  Unknown ( Yes No <Null> <Null>

Unknown USBP ‐ Rio  Unknown ( No No <Null> <Null>

Unknown USBP ‐ Rio  Unknown ( Yes No <Null> <Null>

Unknown USBP ‐ Rio  Unknown ( Yes No <Null> <Null>

Unknown USBP ‐ Rio  Unknown ( No No <Null> <Null>

Unknown USBP ‐ Rio  Unknown ( Yes No <Null> <Null>

Unknown USBP ‐ Rio  Unknown ( No No <Null> <Null>

Unknown USBP ‐ Rio  Unknown ( Yes No <Null> <Null>

Unknown USBP ‐ TucsUnknown ( Yes No <Null> <Null>

Unknown USBP ‐ TucsUnknown ( No No <Null> <Null>

Unknown USBP ‐ TucsUnknown ( Yes No <Null> <Null>

Unknown USBP ‐ TucsUnknown ( No No <Null> <Null>

Unknown USBP ‐ TucsUnknown ( Yes No <Null> <Null>

Unknown USBP ‐ TucsUnknown ( No No <Null> <Null>

Unknown USBP ‐ TucsUnknown ( Yes Yes <Null> Yes

Unknown USBP ‐ TucsUnknown ( Yes Yes <Null> No

Unknown USBP ‐ TucsUnknown ( Yes Yes <Null> Yes

Unknown USBP ‐ TucsUnknown ( Yes Yes <Null> Yes

Unknown USBP ‐ TucsUnknown ( Yes No <Null> <Null>

Unknown USBP ‐ TucsUnknown ( No No <Null> <Null>

Unknown USBP ‐ TucsUnknown ( Yes No <Null> <Null>

Unknown USBP ‐ TucsUnknown ( No No <Null> <Null>

Unknown USBP ‐ TucsUnknown ( Yes Yes <Null> Yes

Unknown USBP ‐ TucsUnknown ( Yes Yes <Null> Yes

Unknown USBP ‐ TucsUnknown ( Yes Yes <Null> Yes

Unknown USBP ‐ TucsUnknown ( Yes Yes <Null> Yes

Unknown USBP ‐ TucsUnknown ( Yes Yes <Null> Yes

Unknown USBP ‐ TucsUnknown ( Yes Yes <Null> Yes

Unknown USBP ‐ TucsUnknown ( Yes Yes <Null> Yes

Unknown USBP ‐ TucsUnknown ( Yes Yes <Null> Yes

Unknown USBP ‐ TucsUnknown ( Yes Yes <Null> Yes

Unknown USBP ‐ TucsUnknown ( Yes Yes <Null> No

BW11 FOIA CBP 003289

(b) (7)(E)

EZAISA6
Sticky Note
None set by EZAISA6
EZAISA6
Sticky Note
MigrationNone set by EZAISA6
EZAISA6
Sticky Note
Unmarked set by EZAISA6
Page 254: From: To: Cc: Subject: FW: TI Presidential Transition (FINAL … · 2019-04-15 · Subject: FW: TI Presidential Transition (FINAL 2).pptx FENCE & ROADS ALCON, Please find attached

Unknown USBP ‐ TucsUnknown ( Yes Yes <Null> No

Unknown USBP ‐ TucsUnknown ( Yes Yes <Null> No

Unknown USBP ‐ TucsUnknown ( Yes Yes <Null> No

Unknown USBP ‐ YumUnknown ( Yes Yes <Null> Yes

Unknown USBP ‐ YumUnknown ( Yes Yes <Null> Yes

Unknown USBP ‐ YumUnknown ( Yes Yes <Null> Yes

Unknown USBP ‐ YumUnknown ( Yes Yes <Null> No

Unknown USBP ‐ YumUnknown ( Yes Yes <Null> No

Unknown USBP ‐ YumUnknown ( Yes Yes <Null> No

Unknown USBP ‐ YumUnknown ( Yes Yes <Null> No

Unknown USBP ‐ YumUnknown ( Yes Yes <Null> Yes

Unknown USBP ‐ YumUnknown ( Yes Yes <Null> Yes

Unknown USBP ‐ YumUnknown ( Yes Yes <Null> Yes

Unknown USBP ‐ YumUnknown ( Yes Yes <Null> Yes

Unknown USBP ‐ YumUnknown ( Yes Yes <Null> Yes

Unknown USBP ‐ YumUnknown ( Yes Yes <Null> No

Unknown USBP ‐ YumUnknown ( Yes Yes <Null> No

Unknown USBP ‐ YumUnknown ( Yes Yes <Null> No

Unknown USBP ‐ TucsUnknown ( Yes Yes <Null> <Null>

Unknown USBP ‐ TucsUnknown ( Yes Yes <Null> <Null>

Unknown USBP ‐ TucsUnknown ( Yes Yes <Null> <Null>

Unknown USBP ‐ TucsUnknown ( Yes Yes <Null> <Null>

Unknown USBP ‐ Blai Unknown ( No No <Null> <Null>

Unknown USBP ‐ Blai Unknown ( No No <Null> <Null>

Unknown USBP ‐ Blai Unknown ( No No <Null> <Null>

Unknown USBP ‐ HouUnknown ( No No <Null> <Null>

Unknown USBP ‐ HouUnknown ( No No <Null> <Null>

Unknown USBP ‐ HouUnknown ( No No <Null> <Null>

Unknown USBP ‐ HouUnknown ( No No <Null> <Null>

Unknown USBP ‐ HouUnknown ( No No <Null> <Null>

Unknown USBP ‐ HouUnknown ( No No <Null> <Null>

Unknown USBP ‐ HouUnknown ( No No <Null> <Null>

Unknown USBP ‐ HouUnknown ( No No <Null> <Null>

Unknown USBP ‐ HouUnknown ( No No <Null> <Null>

Unknown USBP ‐ HouUnknown ( No No <Null> <Null>

Unknown USBP ‐ HouUnknown ( No No <Null> <Null>

Unknown USBP ‐ HouUnknown ( No No <Null> <Null>

Unknown USBP ‐ HouUnknown ( No No <Null> <Null>

Unknown USBP ‐ HouUnknown ( No No <Null> <Null>

Unknown USBP ‐ HouUnknown ( No No <Null> <Null>

Unknown USBP ‐ HouUnknown ( No No <Null> <Null>

Unknown USBP ‐ HouUnknown ( No No <Null> <Null>

Unknown USBP ‐ HouUnknown ( No No <Null> <Null>

Unknown USBP ‐ HouUnknown ( No No <Null> <Null>

Unknown USBP ‐ HouUnknown ( No No <Null> <Null>

Unknown USBP ‐ HouUnknown ( No No <Null> <Null>

Unknown USBP ‐ HouUnknown ( No No <Null> <Null>

BW11 FOIA CBP 003290

(b) (7)(E)

EZAISA6
Sticky Note
None set by EZAISA6
EZAISA6
Sticky Note
MigrationNone set by EZAISA6
EZAISA6
Sticky Note
Unmarked set by EZAISA6
Page 255: From: To: Cc: Subject: FW: TI Presidential Transition (FINAL … · 2019-04-15 · Subject: FW: TI Presidential Transition (FINAL 2).pptx FENCE & ROADS ALCON, Please find attached

Unknown USBP ‐ HouUnknown ( No No <Null> <Null>

Unknown USBP ‐ HouUnknown ( No No <Null> <Null>

Unknown USBP ‐ HouUnknown ( No No <Null> <Null>

Unknown USBP ‐ HouUnknown ( No No <Null> <Null>

Unknown USBP ‐ HouUnknown ( No No <Null> <Null>

Unknown USBP ‐ HouUnknown ( No No <Null> <Null>

Unknown USBP ‐ HouUnknown ( No No <Null> <Null>

Unknown USBP ‐ HouUnknown ( No No <Null> <Null>

Unknown USBP ‐ HouUnknown ( No No <Null> <Null>

Unknown USBP ‐ HouUnknown ( No No <Null> <Null>

Unknown USBP ‐ HouUnknown ( No No <Null> <Null>

Unknown USBP ‐ HavUnknown ( No No <Null> <Null>

Unknown USBP ‐ HavUnknown ( No No <Null> <Null>

Unknown USBP ‐ HavUnknown ( No No <Null> <Null>

Unknown USBP ‐ HavUnknown ( No No <Null> <Null>

Unknown USBP ‐ HavUnknown ( No No <Null> <Null>

Unknown USBP ‐ HavUnknown ( No No <Null> <Null>

Unknown USBP ‐ HavUnknown ( No No <Null> <Null>

Unknown USBP ‐ HavUnknown ( No No <Null> <Null>

Unknown USBP ‐ HavUnknown ( No No <Null> <Null>

Unknown USBP ‐ HavUnknown ( No No <Null> <Null>

Unknown USBP ‐ HavUnknown ( No No <Null> <Null>

Unknown USBP ‐ HavUnknown ( No No <Null> <Null>

Unknown USBP ‐ HavUnknown ( No No <Null> <Null>

Unknown USBP ‐ HavUnknown ( No No <Null> <Null>

Unknown USBP ‐ HavUnknown ( No No <Null> <Null>

Unknown USBP ‐ HavUnknown ( No No <Null> <Null>

Unknown USBP ‐ HavUnknown ( No No <Null> <Null>

Unknown USBP ‐ HavUnknown ( No No <Null> <Null>

Unknown USBP ‐ HavUnknown ( No No <Null> <Null>

Unknown USBP ‐ HavUnknown ( No No <Null> <Null>

Unknown USBP ‐ HavUnknown ( No No <Null> <Null>

Unknown USBP ‐ HavUnknown ( No No <Null> <Null>

Unknown USBP ‐ HavUnknown ( No No <Null> <Null>

Unknown USBP ‐ HavUnknown ( No No <Null> <Null>

Unknown USBP ‐ HavUnknown ( No No <Null> <Null>

Unknown USBP ‐ HavUnknown ( No No <Null> <Null>

Unknown USBP ‐ HavUnknown ( No No <Null> <Null>

Unknown USBP ‐ HavUnknown ( No No <Null> <Null>

Unknown USBP ‐ HavUnknown ( No No <Null> <Null>

Unknown USBP ‐ HavUnknown ( No No <Null> <Null>

Unknown USBP ‐ HavUnknown ( No No <Null> <Null>

Unknown USBP ‐ HavUnknown ( No No <Null> <Null>

Unknown USBP ‐ HavUnknown ( No No <Null> <Null>

Unknown USBP ‐ HavUnknown ( No No <Null> <Null>

Unknown USBP ‐ HavUnknown ( No No <Null> <Null>

Unknown USBP ‐ HavUnknown ( No No <Null> <Null>

BW11 FOIA CBP 003291

(b) (7)(E)

EZAISA6
Sticky Note
None set by EZAISA6
EZAISA6
Sticky Note
MigrationNone set by EZAISA6
EZAISA6
Sticky Note
Unmarked set by EZAISA6
Page 256: From: To: Cc: Subject: FW: TI Presidential Transition (FINAL … · 2019-04-15 · Subject: FW: TI Presidential Transition (FINAL 2).pptx FENCE & ROADS ALCON, Please find attached

Unknown USBP ‐ HavUnknown ( No No <Null> <Null>

Unknown USBP ‐ HavUnknown ( No No <Null> <Null>

Unknown USBP ‐ HavUnknown ( No No <Null> <Null>

Unknown USBP ‐ HavUnknown ( No No <Null> <Null>

Unknown USBP ‐ HavUnknown ( No No <Null> <Null>

Unknown USBP ‐ HavUnknown ( No No <Null> <Null>

Unknown USBP ‐ HavUnknown ( No No <Null> <Null>

Unknown USBP ‐ HavUnknown ( No No <Null> <Null>

Unknown USBP ‐ Spo Unknown ( No No <Null> <Null>

Unknown USBP ‐ Spo Unknown ( No No <Null> <Null>

Unknown USBP ‐ Spo Unknown ( No No Cleared by Prim<Null>

Unknown USBP ‐ Spo Unknown ( No No <Null> <Null>

Unknown USBP ‐ Spo Unknown ( No No Cleared by Prim<Null>

Unknown USBP ‐ Spo Unknown ( No No <Null> <Null>

Unknown USBP ‐ Spo Unknown ( No No <Null> <Null>

Unknown USBP ‐ Spo Unknown ( No No <Null> <Null>

Unknown USBP ‐ Spo Unknown ( No No <Null> <Null>

Unknown USBP ‐ Spo Unknown ( No No <Null> <Null>

Unknown USBP ‐ Spo Unknown ( No No <Null> <Null>

Unknown USBP ‐ Spo Unknown ( No No <Null> <Null>

Unknown USBP ‐ Spo Unknown ( No No <Null> <Null>

Unknown USBP ‐ Spo Unknown ( No No <Null> <Null>

Unknown USBP ‐ Spo Unknown ( No No <Null> <Null>

Unknown USBP ‐ Spo Unknown ( No No <Null> <Null>

Unknown USBP ‐ Spo Unknown ( No No <Null> <Null>

Unknown USBP ‐ Spo Unknown ( No No <Null> <Null>

Unknown USBP ‐ Spo Unknown ( No No <Null> <Null>

Unknown USBP ‐ Spo Unknown ( No No <Null> <Null>

Unknown USBP ‐ Spo Unknown ( No No <Null> <Null>

Unknown USBP ‐ Spo Unknown ( No No <Null> <Null>

Unknown USBP ‐ Spo Unknown ( No No <Null> <Null>

Unknown USBP ‐ Spo Unknown ( No No <Null> <Null>

Unknown USBP ‐ Spo Unknown ( No No <Null> <Null>

Unknown USBP ‐ Spo Unknown ( No No <Null> <Null>

Unknown USBP ‐ Spo Unknown ( No No <Null> <Null>

Unknown USBP ‐ Spo Unknown ( No No <Null> <Null>

Unknown USBP ‐ Spo Unknown ( No No <Null> <Null>

Unknown USBP ‐ Spo Unknown ( No No <Null> <Null>

Unknown USBP ‐ Spo Unknown ( No No <Null> <Null>

Unknown USBP ‐ Spo Unknown ( No No <Null> <Null>

Unknown USBP ‐ Spo Unknown ( No No <Null> <Null>

Unknown USBP ‐ Spo Unknown ( No No <Null> <Null>

Unknown USBP ‐ HouUnknown ( No No <Null> <Null>

Unknown USBP ‐ TucsUnknown ( Yes Yes <Null> Yes

Unknown USBP ‐ TucsUnknown ( Yes Yes <Null> Yes

Unknown USBP ‐ TucsUnknown ( Yes Yes <Null> Yes

Unknown USBP ‐ TucsUnknown ( Yes Yes <Null> Yes

BW11 FOIA CBP 003292

(b) (7)(E)

EZAISA6
Sticky Note
None set by EZAISA6
EZAISA6
Sticky Note
MigrationNone set by EZAISA6
EZAISA6
Sticky Note
Unmarked set by EZAISA6
Page 257: From: To: Cc: Subject: FW: TI Presidential Transition (FINAL … · 2019-04-15 · Subject: FW: TI Presidential Transition (FINAL 2).pptx FENCE & ROADS ALCON, Please find attached

Unknown USBP ‐ TucsUnknown ( Yes Yes <Null> Yes

Unknown USBP ‐ El PaUnknown ( Yes No <Null> <Null>

Unknown USBP ‐ El PaUnknown ( Yes No <Null> <Null>

Unknown USBP ‐ El PaUnknown ( No No <Null> <Null>

Unknown USBP ‐ El PaUnknown ( Yes Yes <Null> Yes

Unknown USBP ‐ El PaUnknown ( Yes Yes <Null> Yes

Unknown USBP ‐ El PaUnknown ( Yes Yes <Null> Yes

Unknown USBP ‐ El PaUnknown ( Yes No <Null> <Null>

Unknown USBP ‐ El PaUnknown ( Yes Yes <Null> Yes

Unknown USBP ‐ El PaUnknown ( Yes Yes <Null> Yes

Unknown USBP ‐ El PaUnknown ( Yes Yes <Null> Yes

Unknown USBP ‐ El PaUnknown ( Yes Yes <Null> Yes

Unknown USBP ‐ El PaUnknown ( Yes Yes <Null> Yes

Unknown USBP ‐ TucsUnknown ( Yes No <Null> <Null>

Unknown USBP ‐ TucsUnknown ( Yes Yes <Null> Yes

Unknown USBP ‐ TucsUnknown ( Yes Yes <Null> Yes

Unknown USBP ‐ TucsUnknown ( No No <Null> <Null>

Unknown USBP ‐ TucsUnknown ( Yes Yes <Null> Yes

Unknown USBP ‐ TucsUnknown ( Yes Yes <Null> Yes

Unknown USBP ‐ TucsUnknown ( No No <Null> <Null>

Unknown USBP ‐ TucsUnknown ( Yes Yes <Null> Yes

Unknown USBP ‐ TucsUnknown ( Yes No <Null> <Null>

Unknown USBP ‐ TucsUnknown ( Yes No <Null> <Null>

Unknown USBP ‐ El PaUnknown ( Yes Yes <Null> Yes

Unknown USBP ‐ El PaUnknown ( Yes Yes <Null> Yes

Unknown USBP ‐ El PaUnknown ( Yes Yes <Null> Yes

Unknown USBP ‐ El PaUnknown ( Yes Yes <Null> Yes

Unknown USBP ‐ El PaUnknown ( Yes Yes <Null> Yes

Unknown USBP ‐ El PaUnknown ( Yes No <Null> <Null>

Unknown USBP ‐ El PaUnknown ( Yes No <Null> <Null>

Unknown USBP ‐ El PaUnknown ( No No <Null> <Null>

Unknown USBP ‐ El PaUnknown ( Yes No <Null> <Null>

Unknown USBP ‐ El PaUnknown ( No No <Null> <Null>

Unknown USBP ‐ El PaUnknown ( Yes Yes <Null> Yes

Unknown USBP ‐ El PaUnknown ( Yes Yes <Null> Yes

Unknown USBP ‐ El PaUnknown ( Yes Yes <Null> Yes

Unknown USBP ‐ El PaUnknown ( Yes Yes <Null> Yes

Unknown USBP ‐ El PaUnknown ( Yes Yes <Null> Yes

Unknown USBP ‐ El PaUnknown ( Yes No <Null> <Null>

Unknown USBP ‐ El PaUnknown ( Yes No <Null> <Null>

Unknown USBP ‐ El PaUnknown ( No No <Null> <Null>

Unknown USBP ‐ El PaUnknown ( Yes Yes <Null> Yes

Unknown USBP ‐ El PaUnknown ( Yes Yes <Null> Yes

Unknown USBP ‐ El PaUnknown ( Yes Yes <Null> Yes

Unknown USBP ‐ El PaUnknown ( Yes Yes <Null> Yes

Unknown USBP ‐ El PaUnknown ( Yes Yes <Null> Yes

Unknown USBP ‐ El PaUnknown ( Yes Yes <Null> Yes

BW11 FOIA CBP 003293

(b) (7)(E)

EZAISA6
Sticky Note
None set by EZAISA6
EZAISA6
Sticky Note
MigrationNone set by EZAISA6
EZAISA6
Sticky Note
Unmarked set by EZAISA6
Page 258: From: To: Cc: Subject: FW: TI Presidential Transition (FINAL … · 2019-04-15 · Subject: FW: TI Presidential Transition (FINAL 2).pptx FENCE & ROADS ALCON, Please find attached

Unknown USBP ‐ El PaUnknown ( Yes Yes <Null> Yes

Unknown USBP ‐ El PaUnknown ( Yes Yes <Null> Yes

Unknown USBP ‐ LareUnknown ( No No <Null> <Null>

Unknown USBP ‐ Spo Unknown ( No No <Null> <Null>

Unknown USBP ‐ Spo Unknown ( No No <Null> <Null>

Unknown USBP ‐ Spo Unknown ( No No <Null> <Null>

Unknown USBP ‐ Spo Unknown ( No No <Null> <Null>

Unknown USBP ‐ Spo Unknown ( No No <Null> <Null>

Unknown USBP ‐ HouUnknown ( No No <Null> <Null>

Unknown USBP ‐ TucsUnknown ( Yes No <Null> <Null>

Unknown USBP ‐ TucsUnknown ( Yes Yes <Null> Yes

Unknown USBP ‐ San Unknown ( Yes Yes <Null> No

Unknown USBP ‐ San Unknown ( Yes Yes <Null> No

Unknown USBP ‐ San Unknown ( Yes Yes <Null> No

Unknown USBP ‐ San Unknown ( Yes Yes <Null> No

Unknown USBP ‐ San Unknown ( Yes Yes <Null> No

Unknown USBP ‐ San Unknown ( Yes Yes <Null> No

Unknown USBP ‐ San Unknown ( Yes Yes <Null> No

Unknown USBP ‐ San Unknown ( Yes Yes <Null> No

Unknown USBP ‐ San Unknown ( Yes Yes <Null> No

Unknown USBP ‐ San Unknown ( Yes Yes <Null> No

Unknown USBP ‐ San Unknown ( Yes Yes <Null> No

Unknown USBP ‐ San Unknown ( Yes Yes <Null> No

Unknown USBP ‐ San Unknown ( Yes Yes <Null> No

Unknown USBP ‐ San Unknown ( Yes Yes <Null> No

Unknown USBP ‐ San Unknown ( Yes Yes <Null> No

Unknown USBP ‐ San Unknown ( Yes Yes <Null> No

Unknown USBP ‐ San Unknown ( Yes Yes <Null> No

Unknown USBP ‐ San Unknown ( Yes Yes <Null> No

Unknown USBP ‐ San Unknown ( Yes Yes <Null> No

Unknown USBP ‐ San Unknown ( Yes Yes <Null> No

Unknown USBP ‐ San Unknown ( Yes Yes <Null> No

Unknown USBP ‐ San Unknown ( Yes Yes <Null> No

Unknown USBP ‐ San Unknown ( Yes Yes <Null> No

Unknown USBP ‐ San Unknown ( Yes Yes <Null> No

Unknown USBP ‐ San Unknown ( Yes Yes <Null> No

Unknown USBP ‐ San Unknown ( Yes Yes <Null> No

Unknown USBP ‐ San Unknown ( Yes Yes <Null> No

Unknown USBP ‐ San Unknown ( Yes Yes <Null> No

Unknown USBP ‐ San Unknown ( Yes Yes <Null> No

Unknown USBP ‐ San Unknown ( Yes Yes <Null> No

Unknown USBP ‐ San Unknown ( Yes Yes <Null> No

Unknown USBP ‐ San Unknown ( Yes Yes <Null> No

Unknown USBP ‐ San Unknown ( Yes Yes <Null> No

Unknown USBP ‐ San Unknown ( Yes Yes <Null> No

Unknown USBP ‐ San Unknown ( Yes Yes <Null> No

Unknown USBP ‐ San Unknown ( Yes Yes <Null> No

BW11 FOIA CBP 003294

(b) (7)(E)

EZAISA6
Sticky Note
None set by EZAISA6
EZAISA6
Sticky Note
MigrationNone set by EZAISA6
EZAISA6
Sticky Note
Unmarked set by EZAISA6
Page 259: From: To: Cc: Subject: FW: TI Presidential Transition (FINAL … · 2019-04-15 · Subject: FW: TI Presidential Transition (FINAL 2).pptx FENCE & ROADS ALCON, Please find attached

Unknown USBP ‐ San Unknown ( Yes Yes <Null> No

Unknown USBP ‐ San Unknown ( Yes Yes <Null> No

Unknown USBP ‐ San Unknown ( Yes Yes <Null> No

Unknown USBP ‐ San Unknown ( Yes No <Null> No

Unknown USBP ‐ San Unknown ( Yes No <Null> No

Unknown USBP ‐ San Unknown ( No No <Null> No

Unknown USBP ‐ San Unknown ( Yes No <Null> No

Unknown USBP ‐ San Unknown ( Yes No <Null> <Null>

Unknown USBP ‐ San Unknown ( No No <Null> <Null>

Unknown USBP ‐ San Unknown ( Yes No <Null> <Null>

Unknown USBP ‐ San Unknown ( Yes Yes <Null> No

Unknown USBP ‐ San Unknown ( Yes Yes <Null> No

Unknown USBP ‐ San Unknown ( Yes Yes <Null> No

Unknown USBP ‐ San Unknown ( Yes Yes <Null> No

Unknown USBP ‐ San Unknown ( Yes No <Null> No

Unknown USBP ‐ San Unknown ( Yes Yes <Null> No

Unknown USBP ‐ San Unknown ( Yes Yes <Null> <Null>

Unknown USBP ‐ San Unknown ( Yes Yes <Null> <Null>

Unknown USBP ‐ San Unknown ( Yes Yes <Null> <Null>

Unknown USBP ‐ San Unknown ( Yes Yes <Null> <Null>

Unknown USBP ‐ San Unknown ( Yes Yes <Null> <Null>

Unknown USBP ‐ San Unknown ( Yes Yes <Null> <Null>

Unknown USBP ‐ San Unknown ( Yes Yes <Null> <Null>

Unknown USBP ‐ San Unknown ( Yes Yes <Null> <Null>

Unknown USBP ‐ San Unknown ( Yes No <Null> No

Unknown USBP ‐ San Unknown ( Yes No <Null> No

Unknown USBP ‐ San Unknown ( No No <Null> No

Unknown USBP ‐ San Unknown ( Yes Yes <Null> <Null>

Unknown USBP ‐ San Unknown ( Yes Yes <Null> No

Unknown USBP ‐ San Unknown ( Yes No <Null> No

Unknown USBP ‐ San Unknown ( Yes Yes <Null> No

Unknown USBP ‐ San Unknown ( Yes No <Null> No

Unknown USBP ‐ San Unknown ( Yes Yes <Null> No

Unknown USBP ‐ San Unknown ( Yes No <Null> No

Unknown USBP ‐ San Unknown ( Yes Yes <Null> No

Unknown USBP ‐ San Unknown ( Yes Yes <Null> No

Unknown USBP ‐ San Unknown ( Yes Yes <Null> No

Unknown USBP ‐ San Unknown ( Yes Yes <Null> No

Unknown USBP ‐ San Unknown ( Yes No <Null> No

Unknown USBP ‐ San Unknown ( Yes Yes <Null> No

Unknown USBP ‐ San Unknown ( Yes Yes <Null> No

Unknown USBP ‐ San Unknown ( Yes Yes <Null> No

Unknown USBP ‐ San Unknown ( Yes Yes <Null> No

Unknown USBP ‐ San Unknown ( No No <Null> No

Unknown USBP ‐ San Unknown ( Yes No <Null> No

Unknown USBP ‐ San Unknown ( Yes Yes <Null> No

Unknown USBP ‐ San Unknown ( Yes Yes <Null> No

BW11 FOIA CBP 003295

(b) (7)(E)

EZAISA6
Sticky Note
None set by EZAISA6
EZAISA6
Sticky Note
MigrationNone set by EZAISA6
EZAISA6
Sticky Note
Unmarked set by EZAISA6
Page 260: From: To: Cc: Subject: FW: TI Presidential Transition (FINAL … · 2019-04-15 · Subject: FW: TI Presidential Transition (FINAL 2).pptx FENCE & ROADS ALCON, Please find attached

Unknown USBP ‐ San Unknown ( Yes No <Null> No

Unknown USBP ‐ San Unknown ( Yes Yes <Null> No

Unknown USBP ‐ San Unknown ( Yes No <Null> No

Unknown USBP ‐ San Unknown ( Yes No <Null> No

Unknown USBP ‐ San Unknown ( Yes Yes Existing ‐ PF <Null>

Unknown USBP ‐ San Unknown ( Yes Yes Existing ‐ PF <Null>

Unknown USBP ‐ San Unknown ( Yes Yes Existing ‐ PF <Null>

Unknown USBP ‐ San Unknown ( Yes Yes Existing ‐ PF <Null>

Unknown USBP ‐ San Unknown ( Yes Yes Existing ‐ PF <Null>

Unknown USBP ‐ San Unknown ( Yes Yes Existing ‐ PF <Null>

Unknown USBP ‐ San Unknown ( Yes Yes Existing ‐ PF <Null>

Unknown USBP ‐ San Unknown ( Yes Yes Existing ‐ PF <Null>

Unknown USBP ‐ San Unknown ( Yes Yes Existing ‐ PF <Null>

Unknown USBP ‐ San Unknown ( Yes Yes Existing ‐ PF <Null>

Unknown USBP ‐ San Unknown ( Yes Yes Existing ‐ PF <Null>

Unknown USBP ‐ San Unknown ( Yes Yes Existing ‐ PF <Null>

Unknown USBP ‐ San Unknown ( Yes Yes Existing ‐ PF <Null>

Unknown USBP ‐ San Unknown ( Yes Yes Existing ‐ PF <Null>

Unknown USBP ‐ San Unknown ( Yes Yes Existing ‐ PF <Null>

Unknown USBP ‐ YumUnknown ( Yes Yes <Null> <Null>

Unknown USBP ‐ YumUnknown ( Yes Yes <Null> <Null>

Unknown USBP ‐ YumUnknown ( Yes Yes <Null> <Null>

Unknown USBP ‐ YumUnknown ( Yes Yes <Null> <Null>

Unknown USBP ‐ YumUnknown ( Yes Yes <Null> No

  USBP ‐ Rio  <Null> Yes No <Null> <Null>

  USBP ‐ Rio  <Null> Yes No <Null> <Null>

  USBP ‐ Rio  <Null> Yes No <Null> <Null>

  USBP ‐ Rio  <Null> Yes No <Null> <Null>

  USBP ‐ Rio  <Null> No No <Null> <Null>

  USBP ‐ Rio  <Null> Yes No <Null> <Null>

  USBP ‐ Rio  <Null> No No <Null> <Null>

  USBP ‐ Rio  <Null> Yes No <Null> <Null>

  USBP ‐ Rio  <Null> No No <Null> <Null>

  USBP ‐ Rio  <Null> Yes No <Null> <Null>

  USBP ‐ Rio  <Null> No No <Null> <Null>

  USBP ‐ Rio  <Null> Yes No <Null> <Null>

  USBP ‐ Rio  <Null> No No <Null> <Null>

  USBP ‐ Rio  <Null> Yes No <Null> <Null>

  USBP ‐ Rio  <Null> No No <Null> <Null>

  USBP ‐ Rio  <Null> Yes No <Null> <Null>

  USBP ‐ Rio  <Null> No No <Null> <Null>

  USBP ‐ Rio  <Null> Yes No <Null> <Null>

  USBP ‐ Rio  <Null> No No <Null> <Null>

  USBP ‐ Rio  <Null> Yes No <Null> <Null>

  USBP ‐ Rio  <Null> No No <Null> <Null>

  USBP ‐ Rio  <Null> Yes No <Null> <Null>

  USBP ‐ Rio  <Null> No No <Null> <Null>

BW11 FOIA CBP 003296

(b) (7)(E)

EZAISA6
Sticky Note
None set by EZAISA6
EZAISA6
Sticky Note
MigrationNone set by EZAISA6
EZAISA6
Sticky Note
Unmarked set by EZAISA6
Page 261: From: To: Cc: Subject: FW: TI Presidential Transition (FINAL … · 2019-04-15 · Subject: FW: TI Presidential Transition (FINAL 2).pptx FENCE & ROADS ALCON, Please find attached

  USBP ‐ Rio  <Null> Yes No <Null> <Null>

  USBP ‐ Rio  <Null> No No <Null> <Null>

  USBP ‐ Rio  <Null> Yes No <Null> <Null>

  USBP ‐ Rio  <Null> No No <Null> <Null>

  USBP ‐ Rio  <Null> Yes No <Null> <Null>

  USBP ‐ Rio  <Null> No No <Null> <Null>

  USBP ‐ Rio  <Null> Yes No <Null> <Null>

  USBP ‐ Rio  <Null> No No <Null> <Null>

  USBP ‐ Rio  <Null> No No <Null> <Null>

  USBP ‐ Rio  <Null> Yes No <Null> <Null>

  USBP ‐ Rio  <Null> No No <Null> <Null>

  USBP ‐ Rio  <Null> No No <Null> <Null>

  USBP ‐ Rio  <Null> Yes No <Null> <Null>

  USBP ‐ Rio  <Null> No No <Null> <Null>

  USBP ‐ Rio  <Null> Yes No <Null> <Null>

  USBP ‐ Rio  <Null> Yes No <Null> <Null>

  USBP ‐ Rio  <Null> No No <Null> <Null>

  USBP ‐ Rio  <Null> Yes No <Null> <Null>

  USBP ‐ Rio  <Null> No No <Null> <Null>

  USBP ‐ Rio  <Null> Yes No <Null> <Null>

  USBP ‐ Rio  <Null> Yes No <Null> <Null>

  USBP ‐ Rio  <Null> No No <Null> <Null>

  USBP ‐ Rio  <Null> Yes No <Null> <Null>

  USBP ‐ Rio  <Null> No No <Null> <Null>

  USBP ‐ Rio  <Null> Yes No <Null> <Null>

  USBP ‐ Rio  <Null> No No <Null> <Null>

  USBP ‐ Rio  <Null> Yes No <Null> <Null>

  USBP ‐ Rio  <Null> No No <Null> <Null>

  USBP ‐ Rio  <Null> Yes No <Null> <Null>

  USBP ‐ Rio  <Null> No No <Null> <Null>

  USBP ‐ Rio  <Null> Yes No <Null> <Null>

  USBP ‐ Rio  <Null> Yes No <Null> <Null>

  USBP ‐ Rio  <Null> No No <Null> <Null>

  USBP ‐ Rio  <Null> Yes No <Null> <Null>

  USBP ‐ Rio  <Null> No No <Null> <Null>

  USBP ‐ Rio  <Null> Yes No <Null> <Null>

  USBP ‐ Rio  <Null> No No <Null> <Null>

  USBP ‐ Rio  <Null> Yes No <Null> <Null>

  USBP ‐ Rio  <Null> No No <Null> <Null>

  USBP ‐ Rio  <Null> No No <Null> <Null>

  USBP ‐ Rio  <Null> Yes No <Null> <Null>

  USBP ‐ Rio  <Null> Yes No <Null> <Null>

  USBP ‐ Rio  <Null> No No <Null> <Null>

  USBP ‐ Rio  <Null> Yes No <Null> <Null>

  USBP ‐ Rio  <Null> No No <Null> <Null>

  USBP ‐ Rio  <Null> No No <Null> <Null>

  USBP ‐ Rio  <Null> Yes No <Null> <Null>

BW11 FOIA CBP 003297

(b) (7)(E)

EZAISA6
Sticky Note
None set by EZAISA6
EZAISA6
Sticky Note
MigrationNone set by EZAISA6
EZAISA6
Sticky Note
Unmarked set by EZAISA6
Page 262: From: To: Cc: Subject: FW: TI Presidential Transition (FINAL … · 2019-04-15 · Subject: FW: TI Presidential Transition (FINAL 2).pptx FENCE & ROADS ALCON, Please find attached

  USBP ‐ Rio  <Null> No No <Null> <Null>

  USBP ‐ Rio  <Null> Yes No <Null> <Null>

  USBP ‐ Rio  <Null> No No <Null> <Null>

  USBP ‐ Rio  <Null> Yes No <Null> <Null>

TX USBP ‐ Rio  <Null> No No <Null>

  USBP ‐ Rio  <Null> No No <Null> <Null>

  USBP ‐ Rio  <Null> Yes No <Null>

  USBP ‐ Rio  <Null> Yes No <Null> <Null>

  USBP ‐ Rio  <Null> Yes No <Null>

  USBP ‐ Rio  <Null> Yes No <Null>

  USBP ‐ Rio  <Null> Yes No <Null>

  USBP ‐ Rio  <Null> Yes No <Null>

  USBP ‐ Rio  <Null> Yes No <Null> <Null>

  USBP ‐ Rio  <Null> Yes No <Null> <Null>

  USBP ‐ Rio  <Null> Yes No <Null>

  USBP ‐ Rio  <Null> Yes No <Null> <Null>

  USBP ‐ Rio  <Null> No No <Null> <Null>

  USBP ‐ Rio  <Null> Yes No <Null> <Null>

  USBP ‐ Rio  <Null> No No <Null> <Null>

  USBP ‐ Rio  <Null> Yes No <Null> <Null>

  USBP ‐ Rio  <Null> No No <Null> <Null>

  USBP ‐ Rio  <Null> Yes No <Null> <Null>

  USBP ‐ Rio  <Null> No No <Null> <Null>

  USBP ‐ Rio  <Null> No No <Null> <Null>

  USBP ‐ Rio  <Null> Yes No <Null> <Null>

  USBP ‐ Rio  <Null> Yes No <Null> <Null>

TX USBP ‐ Rio  <Null> No No <Null> <Null>

  USBP ‐ Rio  <Null> Yes No <Null> <Null>

  USBP ‐ Rio  <Null> No No <Null> <Null>

  USBP ‐ Rio  <Null> Yes No <Null> <Null>

  USBP ‐ Rio  <Null> No No <Null> <Null>

  USBP ‐ Rio  <Null> Yes No <Null> <Null>

  USBP ‐ Rio  <Null> No No <Null> <Null>

  USBP ‐ Rio  <Null> Yes No <Null> <Null>

  USBP ‐ Rio  <Null> No No <Null> <Null>

  USBP ‐ Rio  <Null> Yes No <Null> <Null>

  USBP ‐ Rio  <Null> No No <Null> <Null>

  USBP ‐ Rio  <Null> Yes No <Null> <Null>

  USBP ‐ Rio  <Null> Yes No <Null> <Null>

  USBP ‐ Rio  <Null> Yes No <Null> <Null>

  USBP ‐ Rio  <Null> No No <Null> <Null>

  USBP ‐ Rio  <Null> No No <Null> <Null>

  USBP ‐ Rio  <Null> Yes No <Null> <Null>

  USBP ‐ Rio  <Null> No No <Null> <Null>

  USBP ‐ Rio  <Null> Yes No <Null> <Null>

  USBP ‐ Rio  <Null> Yes No <Null> <Null>

  USBP ‐ Rio  <Null> No No <Null> <Null>

BW11 FOIA CBP 003298

(b) (7)(E)

EZAISA6
Sticky Note
None set by EZAISA6
EZAISA6
Sticky Note
MigrationNone set by EZAISA6
EZAISA6
Sticky Note
Unmarked set by EZAISA6
Page 263: From: To: Cc: Subject: FW: TI Presidential Transition (FINAL … · 2019-04-15 · Subject: FW: TI Presidential Transition (FINAL 2).pptx FENCE & ROADS ALCON, Please find attached

  USBP ‐ Rio  <Null> No No <Null> <Null>

  USBP ‐ Rio  <Null> Yes No <Null> <Null>

  USBP ‐ Rio  <Null> No No <Null> <Null>

  USBP ‐ Rio  <Null> Yes No <Null> <Null>

  USBP ‐ Rio  <Null> No No <Null> <Null>

  USBP ‐ Rio  <Null> No No <Null> <Null>

  USBP ‐ Rio  <Null> Yes No <Null> <Null>

  USBP ‐ Rio  <Null> No No <Null> <Null>

  USBP ‐ Rio  <Null> No No <Null> <Null>

  USBP ‐ Rio  <Null> Yes No <Null> <Null>

  USBP ‐ Rio  <Null> No No <Null> <Null>

  USBP ‐ Rio  <Null> Yes No <Null> <Null>

  USBP ‐ Rio  <Null> Yes No <Null> <Null>

  USBP ‐ Rio  <Null> No No <Null> <Null>

  USBP ‐ Rio  <Null> Yes No <Null> <Null>

  USBP ‐ Rio  <Null> No No <Null> <Null>

  USBP ‐ Rio  <Null> Yes No <Null> <Null>

  USBP ‐ Rio  <Null> No No <Null> <Null>

  USBP ‐ Rio  <Null> Yes No <Null> <Null>

  USBP ‐ Rio  <Null> No No <Null> <Null>

  USBP ‐ Rio  <Null> Yes No <Null> <Null>

  USBP ‐ Rio  <Null> Yes No <Null> <Null>

  USBP ‐ Rio  <Null> No No <Null> <Null>

  USBP ‐ Rio  <Null> Yes No <Null> <Null>

  USBP ‐ Rio  <Null> No No <Null> <Null>

  USBP ‐ Rio  <Null> No No <Null> <Null>

  USBP ‐ Rio  <Null> Yes No <Null> <Null>

  USBP ‐ Rio  <Null> No No <Null> <Null>

  USBP ‐ Rio  <Null> Yes No <Null> <Null>

  USBP ‐ Rio  <Null> No No <Null> <Null>

  USBP ‐ Rio  <Null> No No <Null> <Null>

  USBP ‐ Rio  <Null> Yes No <Null> <Null>

  USBP ‐ Rio  <Null> No No <Null> <Null>

  USBP ‐ Rio  <Null> Yes No <Null> <Null>

  USBP ‐ Rio  <Null> No No <Null> <Null>

  USBP ‐ Rio  <Null> Yes No <Null> <Null>

  USBP ‐ Rio  <Null> No No <Null> <Null>

  USBP ‐ Rio  <Null> Yes No <Null> <Null>

  USBP ‐ Rio  <Null> No No <Null> <Null>

  USBP ‐ Rio  <Null> Yes No <Null> <Null>

  USBP ‐ Rio  <Null> No No <Null> <Null>

  USBP ‐ Rio  <Null> Yes No <Null> <Null>

  USBP ‐ Rio  <Null> No No <Null> <Null>

  USBP ‐ Rio  <Null> Yes No <Null> <Null>

  USBP ‐ Rio  <Null> No No <Null> <Null>

  USBP ‐ Rio  <Null> Yes No <Null> <Null>

  USBP ‐ Rio  <Null> No No <Null> <Null>

BW11 FOIA CBP 003299

(b) (7)(E)

EZAISA6
Sticky Note
None set by EZAISA6
EZAISA6
Sticky Note
MigrationNone set by EZAISA6
EZAISA6
Sticky Note
Unmarked set by EZAISA6
Page 264: From: To: Cc: Subject: FW: TI Presidential Transition (FINAL … · 2019-04-15 · Subject: FW: TI Presidential Transition (FINAL 2).pptx FENCE & ROADS ALCON, Please find attached

  USBP ‐ Rio  <Null> Yes No <Null> <Null>

  USBP ‐ Rio  <Null> Yes No <Null> <Null>

  USBP ‐ Rio  <Null> Yes No <Null> <Null>

  USBP ‐ Rio  <Null> No No <Null> <Null>

  USBP ‐ Rio  <Null> Yes No <Null> <Null>

  USBP ‐ Rio  <Null> No No <Null> <Null>

  USBP ‐ Rio  <Null> Yes No <Null> <Null>

  USBP ‐ Rio  <Null> No No <Null> <Null>

  USBP ‐ Rio  <Null> Yes No <Null> <Null>

  USBP ‐ Rio  <Null> No No <Null> <Null>

  USBP ‐ Rio  <Null> Yes No <Null> <Null>

  USBP ‐ Rio  <Null> No No <Null> <Null>

  USBP ‐ Rio  <Null> Yes No <Null> <Null>

  USBP ‐ Rio  <Null> No No <Null> <Null>

  USBP ‐ Rio  <Null> Yes No <Null> <Null>

  USBP ‐ Rio  <Null> No No <Null> <Null>

  USBP ‐ Rio  <Null> Yes No <Null> <Null>

  USBP ‐ Rio  <Null> No No <Null> <Null>

  USBP ‐ Rio  <Null> Yes No <Null> <Null>

  USBP ‐ Rio  <Null> No No <Null> <Null>

  USBP ‐ Rio  <Null> Yes No <Null> <Null>

  USBP ‐ Rio  <Null> No No <Null> <Null>

  USBP ‐ Rio  <Null> Yes No <Null> <Null>

  USBP ‐ Rio  <Null> No No <Null> <Null>

  USBP ‐ Rio  <Null> Yes No <Null> <Null>

  USBP ‐ Rio  <Null> No No <Null> <Null>

  USBP ‐ Rio  <Null> Yes No <Null> <Null>

  USBP ‐ Rio  <Null> No No <Null> <Null>

  USBP ‐ Rio  <Null> Yes No <Null> <Null>

  USBP ‐ Rio  <Null> No No <Null> <Null>

  USBP ‐ Rio  <Null> Yes No <Null> <Null>

  USBP ‐ Rio  <Null> No No <Null> <Null>

  USBP ‐ Rio  <Null> Yes No <Null> <Null>

  USBP ‐ Rio  <Null> No No <Null> <Null>

  USBP ‐ Rio  <Null> Yes No <Null> <Null>

  USBP ‐ Rio  <Null> No No <Null> <Null>

  USBP ‐ Rio  <Null> Yes No <Null> <Null>

  USBP ‐ Rio  <Null> No No <Null> <Null>

  USBP ‐ Rio  <Null> Yes No <Null> <Null>

  USBP ‐ Rio  <Null> No No <Null> <Null>

  USBP ‐ Rio  <Null> Yes No <Null> <Null>

  USBP ‐ Rio  <Null> No No <Null> <Null>

  USBP ‐ Rio  <Null> Yes No <Null> <Null>

  USBP ‐ Rio  <Null> No No <Null> <Null>

  USBP ‐ Rio  <Null> No No <Null> <Null>

  USBP ‐ Rio  <Null> Yes No <Null> <Null>

TX USBP ‐ Rio  <Null> No No <Null> <Null>

BW11 FOIA CBP 003300

(b) (7)(E)

EZAISA6
Sticky Note
None set by EZAISA6
EZAISA6
Sticky Note
MigrationNone set by EZAISA6
EZAISA6
Sticky Note
Unmarked set by EZAISA6
Page 265: From: To: Cc: Subject: FW: TI Presidential Transition (FINAL … · 2019-04-15 · Subject: FW: TI Presidential Transition (FINAL 2).pptx FENCE & ROADS ALCON, Please find attached

  USBP ‐ Rio  <Null> Yes No <Null> <Null>

  USBP ‐ Rio  <Null> No No <Null> <Null>

  USBP ‐ Rio  <Null> Yes No <Null> <Null>

  USBP ‐ Rio  <Null> No No <Null> <Null>

  USBP ‐ Rio  <Null> Yes No <Null> <Null>

  USBP ‐ Rio  <Null> No No <Null> <Null>

  USBP ‐ Rio  <Null> Yes No <Null> <Null>

  USBP ‐ Rio  <Null> No No <Null> <Null>

  USBP ‐ Rio  <Null> Yes No <Null> <Null>

  USBP ‐ Rio  <Null> No No <Null> <Null>

  USBP ‐ Rio  <Null> Yes No <Null> <Null>

  USBP ‐ Rio  <Null> Yes No <Null> <Null>

  USBP ‐ Rio  <Null> No No <Null> <Null>

  USBP ‐ Rio  <Null> Yes No <Null> <Null>

  USBP ‐ Rio  <Null> No No <Null> <Null>

  USBP ‐ Rio  <Null> Yes No <Null> <Null>

  USBP ‐ Rio  <Null> Yes No <Null> <Null>

  USBP ‐ Rio  <Null> Yes No <Null> <Null>

  USBP ‐ Rio  <Null> No No <Null> <Null>

  USBP ‐ Rio  <Null> Yes No <Null> <Null>

  USBP ‐ Rio  <Null> No No <Null> <Null>

  USBP ‐ Rio  <Null> Yes No <Null> <Null>

  USBP ‐ Rio  <Null> No No <Null> <Null>

  USBP ‐ Rio  <Null> Yes No <Null> <Null>

  USBP ‐ Rio  <Null> Yes No <Null> <Null>

  USBP ‐ Rio  <Null> No No <Null> <Null>

  USBP ‐ Rio  <Null> No No <Null> <Null>

  USBP ‐ Rio  <Null> No No <Null> <Null>

  USBP ‐ Rio  <Null> No No <Null> <Null>

  USBP ‐ Rio  <Null> Yes No <Null> <Null>

  USBP ‐ Rio  <Null> No No <Null> <Null>

  USBP ‐ Rio  <Null> Yes No <Null> <Null>

  USBP ‐ Rio  <Null> No No <Null> <Null>

  USBP ‐ Rio  <Null> Yes No <Null> <Null>

  USBP ‐ Rio  <Null> Yes No <Null> <Null>

  USBP ‐ Rio  <Null> Yes No <Null> <Null>

  USBP ‐ Rio  <Null> Yes No <Null> <Null>

  USBP ‐ Rio  <Null> No No <Null> <Null>

  USBP ‐ Rio  <Null> Yes No <Null> <Null>

  USBP ‐ Rio  <Null> Yes No <Null> <Null>

  USBP ‐ Rio  <Null> No No <Null> <Null>

  USBP ‐ Rio  <Null> Yes No <Null> <Null>

  USBP ‐ Rio  <Null> Yes No <Null> <Null>

  USBP ‐ Rio  <Null> No No <Null> <Null>

  USBP ‐ Rio  <Null> No No <Null> <Null>

  USBP ‐ Rio  <Null> Yes No <Null> <Null>

  USBP ‐ Rio  <Null> No No <Null> <Null>

BW11 FOIA CBP 003301

(b) (7)(E)

EZAISA6
Sticky Note
None set by EZAISA6
EZAISA6
Sticky Note
MigrationNone set by EZAISA6
EZAISA6
Sticky Note
Unmarked set by EZAISA6
Page 266: From: To: Cc: Subject: FW: TI Presidential Transition (FINAL … · 2019-04-15 · Subject: FW: TI Presidential Transition (FINAL 2).pptx FENCE & ROADS ALCON, Please find attached

  USBP ‐ Rio  <Null> Yes No <Null> <Null>

  USBP ‐ Rio  <Null> No No <Null> <Null>

  USBP ‐ Rio  <Null> Yes No <Null> <Null>

  USBP ‐ Rio  <Null> No No <Null> <Null>

  USBP ‐ Rio  <Null> Yes No <Null> <Null>

  USBP ‐ Rio  <Null> No No <Null> <Null>

  USBP ‐ Rio  <Null> Yes No <Null> <Null>

  USBP ‐ Rio  <Null> No No <Null> <Null>

  USBP ‐ Rio  <Null> Yes No <Null> <Null>

Unknown USBP ‐ Del Unknown ( Yes No <Null> <Null>

Unknown USBP ‐ Del Unknown ( Yes No <Null> <Null>

Unknown USBP ‐ Del Unknown ( Yes No <Null> <Null>

Unknown USBP ‐ Del Unknown ( No No <Null> <Null>

Unknown USBP ‐ Del Unknown ( Yes No <Null> <Null>

Unknown USBP ‐ Del Unknown ( Yes No <Null> <Null>

Unknown USBP ‐ Del Unknown ( No No <Null> <Null>

Unknown USBP ‐ Del Unknown ( Yes No <Null> <Null>

Unknown USBP ‐ Del Unknown ( No No <Null> <Null>

Unknown USBP ‐ Del Unknown ( Yes No <Null> <Null>

Unknown USBP ‐ Del Unknown ( No No <Null> <Null>

Unknown USBP ‐ Del Unknown ( Yes No <Null> <Null>

Unknown USBP ‐ Del Unknown ( Yes No <Null> <Null>

Unknown USBP ‐ Del Unknown ( No No <Null> <Null>

Unknown USBP ‐ Del Unknown ( Yes No <Null> <Null>

Unknown USBP ‐ Del Unknown ( No No <Null> <Null>

Unknown USBP ‐ Del Unknown ( Yes No <Null> <Null>

Unknown USBP ‐ Del Unknown ( No No <Null> <Null>

Unknown USBP ‐ Del Unknown ( Yes No <Null> <Null>

Unknown USBP ‐ Del Unknown ( No No <Null> <Null>

Unknown USBP ‐ Del Unknown ( No No <Null> <Null>

Unknown USBP ‐ Del Unknown ( Yes No <Null> <Null>

Unknown USBP ‐ Del Unknown ( No No <Null> <Null>

Unknown USBP ‐ Del Unknown ( Yes No <Null> <Null>

Unknown USBP ‐ Del Unknown ( Yes No <Null> <Null>

Unknown USBP ‐ Del Unknown ( No No <Null> <Null>

Unknown USBP ‐ Del Unknown ( Yes No <Null> <Null>

Unknown USBP ‐ Del Unknown ( No No <Null> <Null>

Unknown USBP ‐ Del Unknown ( No No <Null> <Null>

Unknown USBP ‐ Del Unknown ( Yes No <Null> <Null>

Unknown USBP ‐ Del Unknown ( No No <Null> <Null>

Unknown USBP ‐ Del Unknown ( Yes No <Null> <Null>

Unknown USBP ‐ Del Unknown ( Yes No <Null> <Null>

Unknown USBP ‐ Del Unknown ( Yes No <Null> <Null>

Unknown USBP ‐ Del Unknown ( Yes No <Null> <Null>

Unknown USBP ‐ Del Unknown ( Yes No <Null> <Null>

Unknown USBP ‐ Del Unknown ( No No <Null> <Null>

Unknown USBP ‐ Del Unknown ( Yes No <Null> <Null>

BW11 FOIA CBP 003302

(b) (7)(E)

EZAISA6
Sticky Note
None set by EZAISA6
EZAISA6
Sticky Note
MigrationNone set by EZAISA6
EZAISA6
Sticky Note
Unmarked set by EZAISA6
Page 267: From: To: Cc: Subject: FW: TI Presidential Transition (FINAL … · 2019-04-15 · Subject: FW: TI Presidential Transition (FINAL 2).pptx FENCE & ROADS ALCON, Please find attached

Unknown USBP ‐ Del Unknown ( No No <Null> <Null>

Unknown USBP ‐ Del Unknown ( Yes No <Null> <Null>

Unknown USBP ‐ Del Unknown ( No No <Null> <Null>

Unknown USBP ‐ Del Unknown ( Yes No <Null> <Null>

Unknown USBP ‐ Del Unknown ( Yes No <Null> <Null>

Unknown USBP ‐ Del Unknown ( Yes No <Null> <Null>

Unknown USBP ‐ Del Unknown ( Yes No <Null> <Null>

Unknown USBP ‐ Del Unknown ( Yes No <Null> <Null>

Unknown USBP ‐ Del Unknown ( Yes No <Null> <Null>

Unknown USBP ‐ Del Unknown ( Yes No <Null> <Null>

Unknown USBP ‐ Del Unknown ( No No <Null> <Null>

Unknown USBP ‐ Del Unknown ( No No <Null> <Null>

Unknown USBP ‐ Del Unknown ( Yes No <Null> <Null>

Unknown USBP ‐ Del Unknown ( No No <Null> <Null>

Unknown USBP ‐ Del Unknown ( Yes No <Null> <Null>

Unknown USBP ‐ Del Unknown ( No No <Null> <Null>

Unknown USBP ‐ Del Unknown ( Yes No <Null> <Null>

Unknown USBP ‐ Del Unknown ( Yes No <Null> <Null>

Unknown USBP ‐ Del Unknown ( No No <Null> <Null>

Unknown USBP ‐ Del Unknown ( Yes No <Null> <Null>

Unknown USBP ‐ Del Unknown ( Yes No <Null> <Null>

Unknown USBP ‐ Del Unknown ( No No <Null> <Null>

Unknown USBP ‐ Del Unknown ( Yes No <Null> <Null>

Unknown USBP ‐ Del Unknown ( No No <Null> <Null>

Unknown USBP ‐ Del Unknown ( No No <Null> <Null>

Unknown USBP ‐ Del Unknown ( No No <Null> <Null>

Unknown USBP ‐ Del Unknown ( No No <Null> <Null>

Unknown USBP ‐ Del Unknown ( Yes No <Null> <Null>

Unknown USBP ‐ Del Unknown ( No No <Null> <Null>

Unknown USBP ‐ Del Unknown ( Yes No <Null> <Null>

Unknown USBP ‐ Del Unknown ( No No <Null> <Null>

Unknown USBP ‐ Del Unknown ( Yes No <Null> <Null>

Unknown USBP ‐ Del Unknown ( No No <Null> <Null>

Unknown USBP ‐ Del Unknown ( Yes No <Null> <Null>

Unknown USBP ‐ Del Unknown ( Yes No <Null> <Null>

Unknown USBP ‐ Del Unknown ( Yes No <Null> <Null>

Unknown USBP ‐ Del Unknown ( No No <Null> <Null>

Unknown USBP ‐ Del Unknown ( Yes No <Null> <Null>

Unknown USBP ‐ Del Unknown ( No No <Null> <Null>

Unknown USBP ‐ Big  Unknown ( No No <Null> <Null>

Unknown USBP ‐ Big  Unknown ( No No <Null> <Null>

Unknown USBP ‐ Big  Unknown ( No No <Null> <Null>

Unknown USBP ‐ TucsUnknown ( Yes No <Null> <Null>

Unknown USBP ‐ TucsUnknown ( No No <Null> <Null>

Unknown USBP ‐ TucsUnknown ( Yes No <Null> <Null>

Unknown USBP ‐ TucsUnknown ( Yes Yes <Null> Yes

Unknown USBP ‐ TucsUnknown ( Yes Yes <Null> <Null>

BW11 FOIA CBP 003303

(b) (7)(E)

EZAISA6
Sticky Note
None set by EZAISA6
EZAISA6
Sticky Note
MigrationNone set by EZAISA6
EZAISA6
Sticky Note
Unmarked set by EZAISA6
Page 268: From: To: Cc: Subject: FW: TI Presidential Transition (FINAL … · 2019-04-15 · Subject: FW: TI Presidential Transition (FINAL 2).pptx FENCE & ROADS ALCON, Please find attached

Unknown USBP ‐ TucsUnknown ( Yes Yes <Null> Yes

Unknown USBP ‐ TucsUnknown ( Yes Yes <Null> <Null>

Unknown USBP ‐ TucsUnknown ( Yes Yes <Null> Yes

Unknown USBP ‐ TucsUnknown ( Yes Yes <Null> <Null>

Unknown USBP ‐ TucsUnknown ( Yes Yes <Null> Yes

Unknown USBP ‐ TucsUnknown ( Yes Yes <Null> <Null>

Unknown USBP ‐ TucsUnknown ( Yes Yes <Null> Yes

Unknown USBP ‐ TucsUnknown ( Yes Yes <Null> <Null>

  USBP ‐ Rio  <Null> No No <Null> <Null>

Unknown USBP ‐ San Unknown ( Yes Yes <Null> No

Unknown USBP ‐ San Unknown ( Yes Yes <Null> No

Unknown USBP ‐ San Unknown ( Yes Yes <Null> No

Unknown USBP ‐ San Unknown ( Yes Yes <Null> No

Unknown USBP ‐ San Unknown ( Yes Yes <Null> No

Unknown USBP ‐ San Unknown ( Yes Yes <Null> No

Unknown USBP ‐ San Unknown ( Yes Yes <Null> No

Unknown USBP ‐ San Unknown ( Yes Yes <Null> No

Unknown USBP ‐ El PaUnknown ( Yes Yes <Null> Yes

Unknown USBP ‐ TucsUnknown ( Yes Yes <Null> Yes

Unknown USBP ‐ TucsUnknown ( Yes Yes <Null> <Null>

Unknown USBP ‐ San USBP  Yes No <Null> No

Unknown USBP ‐ TucsUnknown ( Yes Yes <Null> No

Unknown USBP ‐ El PaUnknown ( Yes Yes <Null> No

TX USBP ‐ Rio  <Null> No Yes <Null> No

TX USBP ‐ Rio  <Null> No Yes <Null> No

TX USBP ‐ Rio  <Null> No Yes <Null> No

TX USBP ‐ Rio  <Null> No Yes <Null> No

TX USBP ‐ Rio  <Null> No Yes <Null> No

TX USBP ‐ Rio  <Null> No Yes <Null> No

TX USBP ‐ Rio  <Null> No Yes <Null> No

TX USBP ‐ Rio  <Null> No Yes <Null> No

Unknown USBP ‐ SwaUnknown ( No No <Null> <Null>

Unknown USBP ‐ SwaUnknown ( No No <Null> <Null>

Unknown USBP ‐ SwaUnknown ( No No <Null> <Null>

Unknown USBP ‐ SwaUnknown ( No No <Null> <Null>

Unknown USBP ‐ SwaUnknown ( No No <Null> <Null>

Unknown USBP ‐ SwaUnknown ( No No <Null> <Null>

Unknown USBP ‐ SwaUnknown ( No No <Null> <Null>

Unknown USBP ‐ SwaUnknown ( No No <Null> <Null>

Unknown USBP ‐ SwaUnknown ( No No <Null> <Null>

Unknown USBP ‐ SwaUnknown ( No No <Null> <Null>

Unknown USBP ‐ SwaUnknown ( No No <Null> <Null>

Unknown USBP ‐ SwaUnknown ( No No <Null> <Null>

Unknown USBP ‐ SwaUnknown ( No No <Null> <Null>

Unknown USBP ‐ SwaUnknown ( No No <Null> <Null>

Unknown USBP ‐ SwaUnknown ( No No <Null> <Null>

Unknown USBP ‐ SwaUnknown ( No No <Null> <Null>

BW11 FOIA CBP 003304

(b) (7)(E)

(b) (7)(E)

EZAISA6
Sticky Note
None set by EZAISA6
EZAISA6
Sticky Note
MigrationNone set by EZAISA6
EZAISA6
Sticky Note
Unmarked set by EZAISA6
Page 269: From: To: Cc: Subject: FW: TI Presidential Transition (FINAL … · 2019-04-15 · Subject: FW: TI Presidential Transition (FINAL 2).pptx FENCE & ROADS ALCON, Please find attached

Unknown USBP ‐ SwaUnknown ( No No <Null> <Null>

Unknown USBP ‐ SwaUnknown ( No No <Null> <Null>

Unknown USBP ‐ SwaUnknown ( No No <Null> <Null>

Unknown USBP ‐ SwaUnknown ( No No <Null> <Null>

Unknown USBP ‐ SwaUnknown ( No No <Null> <Null>

Unknown USBP ‐ SwaUnknown ( No No <Null> <Null>

Unknown USBP ‐ SwaUnknown ( No No <Null> <Null>

Unknown USBP ‐ SwaUnknown ( No No <Null> <Null>

Unknown USBP ‐ SwaUnknown ( No No <Null> <Null>

Unknown USBP ‐ SwaUnknown ( No No <Null> <Null>

Unknown USBP ‐ SwaUnknown ( No No <Null> <Null>

Unknown USBP ‐ SwaUnknown ( No No <Null> <Null>

Unknown USBP ‐ SwaUnknown ( No No <Null> <Null>

Unknown USBP ‐ SwaUnknown ( No No <Null> <Null>

Unknown USBP ‐ SwaUnknown ( No No <Null> <Null>

Unknown USBP ‐ SwaUnknown ( No No <Null> <Null>

Unknown USBP ‐ SwaUnknown ( No No <Null> <Null>

Unknown USBP ‐ SwaUnknown ( No No <Null> <Null>

Unknown USBP ‐ SwaUnknown ( No No <Null> <Null>

Unknown USBP ‐ SwaUnknown ( No No <Null> <Null>

Unknown USBP ‐ SwaUnknown ( No No <Null> <Null>

Unknown USBP ‐ SwaUnknown ( No No <Null> <Null>

Unknown USBP ‐ HouUnknown ( No No <Null> <Null>

Unknown USBP ‐ SwaUnknown ( No No <Null> <Null>

BW11 FOIA CBP 003305

(b) (7)(E)

Page 270: From: To: Cc: Subject: FW: TI Presidential Transition (FINAL … · 2019-04-15 · Subject: FW: TI Presidential Transition (FINAL 2).pptx FENCE & ROADS ALCON, Please find attached

C++ = all features

C+ = Constrained 'No'

OMB = Constrained 'Yes' + 'No'

New Construction includes; PF Primary, VF Primary, Unconstructed PF, Unconstructed VF

Primary PF includes Unconstructed PF

Primary VF includes Unconstructed VF

BW11 FOIA CBP 003306

Page 271: From: To: Cc: Subject: FW: TI Presidential Transition (FINAL … · 2019-04-15 · Subject: FW: TI Presidential Transition (FINAL 2).pptx FENCE & ROADS ALCON, Please find attached

Office of Facilities and Asset Management

Fence and Road Mileage

U.S. Customs and Border Protection

Nomenclature and Breakdown of Requirements

January 6, 2016

1

BW11 FOIA CBP 003307

Page 272: From: To: Cc: Subject: FW: TI Presidential Transition (FINAL … · 2019-04-15 · Subject: FW: TI Presidential Transition (FINAL 2).pptx FENCE & ROADS ALCON, Please find attached

Nomenclature

• Constrained Plus-Plus – full inventory of fence requirements, new construction and replacement

• Constrained Plus – Priority miles

• OMB Values – Miles utilized for the OMB budget task

2

BW11 FOIA CBP 003308

Page 273: From: To: Cc: Subject: FW: TI Presidential Transition (FINAL … · 2019-04-15 · Subject: FW: TI Presidential Transition (FINAL 2).pptx FENCE & ROADS ALCON, Please find attached

Constrained Plus-Plus

These numbers include the full inventory of requirements from USBP covering the northern and southern borders.

• New Fence –– Primary Pedestrian –– Fence Secondary Pedestrian –– Fence Vehicle –

• Replacement – no change– PF – – VF to PF –

Total Constrained Plus-Plus –

3

BW11 FOIA CBP 003309

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

Page 274: From: To: Cc: Subject: FW: TI Presidential Transition (FINAL … · 2019-04-15 · Subject: FW: TI Presidential Transition (FINAL 2).pptx FENCE & ROADS ALCON, Please find attached

Constrained Plus-Plus

These numbers include the full inventory of requirements from USBP covering the northern and southern borders.

4

SectorPrimary Pedestrian

Primary Vehicle

Secondary Pedestrian

Replacement Pedestrian

Vehicle to Pedestrian

Big Bend

Blaine

Del Rio

El Centro

El Paso

Havre

Houlton

Laredo

Rio Grande Valley

San Diego

Spokane

Swanton

Tucson

Yuma

Total

BW11 FOIA CBP 003310

(b) (7)(E)

Page 275: From: To: Cc: Subject: FW: TI Presidential Transition (FINAL … · 2019-04-15 · Subject: FW: TI Presidential Transition (FINAL 2).pptx FENCE & ROADS ALCON, Please find attached

Constrained Plus

• New Fence Construction –– SDC =– EPT =– RGV =

• Replacement Fence –– SDC =– ELC =– YUM =– TCA =– EPT =

• Other– RGV = Real Estate funding for – HVM = fencing or other barrier TBD

Total Constrained Plus –

5

BW11 FOIA CBP 003311

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

Page 276: From: To: Cc: Subject: FW: TI Presidential Transition (FINAL … · 2019-04-15 · Subject: FW: TI Presidential Transition (FINAL 2).pptx FENCE & ROADS ALCON, Please find attached

OMB Values – Frozen

Constrained requirements for “quick-wins” including priority new fence construction, all replacement fence (PF replacement and VF to PF replacement), non-owned operational roads that are “Green-Green”, and the real estate funding required to complete the RGV project.

• New Fence Construction –– SDC =– EPT =– RGV

• Replacement Fence –– SDC – ELC =– YUM – TCA =– EPT =

• Roads –

• RGV eal Estate –

Total OMB Fence Values –

6

BW11 FOIA CBP 003312

(b) (7)(E)

(b) (7)(E)(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E) (b) (7)(E)

(b) (7)(E)

Page 277: From: To: Cc: Subject: FW: TI Presidential Transition (FINAL … · 2019-04-15 · Subject: FW: TI Presidential Transition (FINAL 2).pptx FENCE & ROADS ALCON, Please find attached

OMB Values – Measured

Constrained requirements for “quick-wins” including priority new fence construction, all replacement fence (PF replacement and VF to PF replacement), non-owned operational roads that are “Green-Green”, and the real estate funding required to complete the RGV project.

• New Fence Construction –– SDC – EPT – RGV

• Replacement Fence –– SDC – ELC =– YUM – TCA =– EPT =

• Roads

• RGV Real Estate

Total OMB Fence Values

7

BW11 FOIA CBP 003313

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)

(b) (7)(E)(b) (7)(E)

(b) (7)(E)(b) (7)(E)

(b) (7)(E)

(b) (7)(E)