from the Tarbela dam, to a 52 km long concrete-lined channel. The ... system under the channel to...
30
from the Tarbela dam, to a 52 km long concrete-lined channel. The ... system under the channel to minimise seepage losses and adverse effects on the local groundwater levels; and (iv)