From Shelter to New Safe
Confinement
A. Gora
Deputy General Director for PersonnelManagement
SSE Chernobyl NPP, Ukraine
7/31/2019 From Shelter to New SafeConfinement
2/16
ChNPPStrategicPlanningService2
CommissioningCommissioning
DevelopmentofestablishedChNPPcapacities:September26,1977
Unit1
wascommissioned
December21,1978
Unit2
wascommissionedDecember3,
1981
Unit3
wascommissioned
December21,1983 Unit4
wascommissioned
Turbine HallSight on
turbogenerators
TG-1,2
7/31/2019 From Shelter to New SafeConfinement
3/16
ChNPPStrategicPlanningService3 3
Accident of Apr il 26, 1986Accident of Apr il 26, 1986
Accident at Chernobyl NPPUnit 4 occurred on April,26, 1986 at 01:23:40 a.m.(Moscow time)
It was possible to stopactive release of radioactivesubstances from destroyedreactor only in the end of
May, 1986
7/31/2019 From Shelter to New SafeConfinement
4/16
ChNPPStrategicPlanningService4
Accident of Apr il 26, 1986Accident of Apr il 26, 1986
The rate of gamma-radiation dose
was up to 2,000 R/h
(20 Sv/h) and
mainly was determined by
radiation from reactor breakdown
itself, inside of which measurable
values of dose rate amounted to
50,000 R/h
(500 Sv/h).
7/31/2019 From Shelter to New SafeConfinement
5/16
ChNPPStrategicPlanningService5
Creat ion of Shelt er Obj ectCreat ion of Shelt er Obj ect
Designing of protective sarcophagus(Shelter) commenced on May 20,
1986;
Construction lasted 206 days andnights from June to November 1986.
7/31/2019 From Shelter to New SafeConfinement
6/16ChNPPStrategicPlanningService
6
New Safe Confinement Creation (NSC)New Safe Confinement Creation (NSC)
In 2012 it is planned to start production of steelconstructions of NSC Arch.
Milestones for NSC creation:
Foundations construction completion
May,
2013.
Main Arch construction assembly November, 2014. NSC Commissioning
October,
2015.
7/31/2019 From Shelter to New SafeConfinement
7/16ChNPPStrategicPlanningService
7
ChNPP Units shutdownChNPP Units shutdown
Chernobyl NPP Unit 3 was finally shutdown on December 15,
2000 at 13:17 according to the Decree of the President ofUkraine. Plant stopped power generation.
7/31/2019 From Shelter to New SafeConfinement
8/16ChNPPStrategicPlanningService
8
Before the accident Chernobyl NPP generated 150.2 billion kW/h .After the accident 158.6 billion kW/h.In total it was generated 308.8 billion kW/h.
Unit 1Unit 2Unit 3ShelterObject
1977 19961978 19911981 20001983 1986
Chernobyl NPP site from satellite
ChNPP Units shutdownChNPP Units shutdown
7/31/2019 From Shelter to New SafeConfinement
9/16ChNPPStrategicPlanningService
9
STRESS-TESTSTRESS-TEST
In 2011 the Chernobyl NPP, the first among Ukrainian NPPs, performedthe targeted unscheduled safety assessment of ChNPP nuclear facilities
by its own forces taking into consideration the events at Fukushima 1 NPP
(stress-test).
The full-scale emergency trainings including personnel actions in case ofaccident and examination of the capabilities of emergency response units
were conducted.
Safety Improvement Plan for ChNPP facilities was developed:
control, collection and return system for ISF-1 leakages was created;
conditions enabling to connect a mobile diesel generator for ISF-1
consumers were created, tests were carried out;
it is planned to conduct psychological training of personnel aimed at
increasing resistance to psychological stress, development of endurance,
self-control, mutual supportiveness and interaction;
system of psychological selection and training of persons involved in
managing the accidents with severe consequences is being developed
(similar to system of operational personnel selection).
7/31/2019 From Shelter to New SafeConfinement
10/16ChNPPStrategicPlanningService
10
Spent Nuclear Fuel Management (SNF)Spent Nuclear Fuel Management (SNF)
At the moment reactors of Units 1, 2 and 3 arecompletely released from nuclear fuel.
Fuel is only in cooling pools of Units 1 and 2.
To reduce risks during New Safe Confinementconstruction, spent nuclear fuel was transferred fromcooling pools of Unit 3 to Interim Spent Fuel StorageFacility (ISF-1).
In order to improve nuclear safety, it was proposed totransport SNF from Units 1 and 2 to ISF-1 for storage.
In November 2011, the State Nuclear RegulatoryInspectorate of Ukraine agreed the Decision to placeall conditioned SNF from Units 1, 2 and 3 to ISF-1.
Works on spent nuclear fuel transportation fromcooling pools of Units 1 and 2 to ISF-1 werecommenced.
7/31/2019 From Shelter to New SafeConfinement
11/16ChNPPStrategicPlanningService
11
The Final State ofDecommissioning NPP can be changed
The Final State ofDecommissioning NPP can be changed
"Green field" status
"Brown spot" status
Developedindustrial site
ChNPP is located at the territory of Exclusion
Zone contaminated with radioactive
substances as a result of accident in 1986.
Thats why decommissioning of Chernobyl
NPP up to the "green field" status is
unreasonable.
A brown spot is a condition of ChNPP industrial
site when its territory and buildings can berestricted released from the regulating control.
Reuse of ChNPP site as National operator of
NPP units decommissioning, SNF and RAW
management is the most desirable final state: a fast and cheap way to reach decommissioning
objectives
using financial and technical resources and
qualified staff of ChNPP more effectively;
solving problems of nuclear industry.
7/31/2019 From Shelter to New SafeConfinement
12/16
ChNPPStrategicPlanningService12
SSE ChNPP Emergency Preparedness
System SSE ChNPP Emergency PreparednessSSE ChNPP Emergency Preparedness
SystemSystem
The Main Tasks of ChNPP Emergency
Preparedness and Response System
Assurance of preparedness to eliminate accidentsand emergencies at SSE Chernobyl NPP facilities; Response to accidents and emergencies at the SSEChernobyl NPP facilities;
Implementation of measures on protecting the NPP
personnel and environment.
7/31/2019 From Shelter to New SafeConfinement
13/16
ChNPPStrategicPlanningService13
SSE ChNPP Emergency Preparedness
System SSE ChNPP Emergency PreparednessSSE ChNPP Emergency Preparedness
SystemSystem
Emergency organizational structures of SSE Chernobyl NPP includes:
Emergency Manager at industrial sites of SSE Chernobyl NPP
facilities
(EMS);
Coordination and Management Body
EMS Staff Office or SSE Chernobyl
NPP
Commission on the Issues of Emergencies (as a synonym);
Standing Management Body
Emergency Preparedness and Response
Department (EP&RD);
SSE Chernobyl NPP
emergency teams and units:
Radiation control unit; Dosimetric survey unit;
Physical protection assurance unit;
Personnel sanitary treatment unit;
Transport unit, etc.;
Teams for elimination of equipmentfailures.
7/31/2019 From Shelter to New SafeConfinement
14/16
ChNPPStrategicPlanningService14
SSE ChNPP Emergency UnitsSSE ChNPP Emergency UnitsSSE ChNPP Emergency Units
The Main Tasks of NPP Emergency Units are:
Actions on preventing beyond-design-basis accidents and
eliminating their consequences;
Measures on personnel protection;
Recommendations on population protection.
A General Director is an Emergency Manager at the ChNPP
industrial site.
7/31/2019 From Shelter to New SafeConfinement
15/16
ChNPPStrategicPlanningService15
SSE ChNPP Emergency UnitsSSE ChNPP Emergency UnitsSSE ChNPP Emergency Units
The Main Functions of EMS:
Primary and subsequent classification of an accident;
Notification of personnel and external organizations;
Initiation of Emergency Plan;
Management of actions on accident containment and elimination;
Coordination of actions of external organizations involved into
emergency and rescue operations;
Provision of information to a Ministry of Emergencies management,
regulatory body, authorities and mass media;
Decision-making on Emergency Plans ending.
The SSE ChNPP personnel is contained in protective shelters
having -radiation dose rate 0,5 mSv/h.
The SSE ChNPP personnel is evacuated having -radiation dose
rate 1 mSv/h.
7/31/2019 From Shelter to New SafeConfinement
16/16
ChNPPStrategicPlanningService16
Thank you for attention!