fr^A[ ftt trT t+* ffi IfSfH r4sF Towhom it moy concern Ero's Multiloterotion svstem in BeUing CopitolInternotionol Airport, Chino Beijing CopitolInternotionol Airport held o competitive tenderin April 2006 for on ASMGCS which resulted in o controctoword in October2006 to Pork AirSystems os the successful bidder. The MLAT system designed os port of the winning tenderresponse of Pork AirSystems wos provided by Ero using their well proven ond robust MSS technology. The specific requirements for the MLAT system of Beijing Copitol Internotionol Airport were verystringenf ond demonding in terms of occurocy, coverogeond redundoncy ond the solution design delivered by Ero met the requiremenfs odmirobly, ond in mony coses exceeded them os well. Due to the complexity of the oirport, the delivered system hos26 remotestotions oroundthe oirport thot delivers MLAT doto to the ASMGCS in the tower - the implementotion of this system hosled to o noticeoble increose of troffic flow on the oirports surfoces. During the project delivery, the MSS of Ero possed Foctory Acceptonce Testing ond ullimotely possed Site AcceptonceTesting ond become operotionol in Morch2008. Ero isrecognized to be the world's leoderin MLAT technology ond olsoo relioble ond communicotive portner.TheEro technicions who instolled the system ond troined the stoff of Beijing were of o veryhighcolibre ond ullimotely, the project wos delivered on time ond within budget. lf you need ony further informotion, pleose don't hesitofe to contoct me. Zeng Sihong Director BEIJING AIRSPACE AND TERMINAL RECONSTRUCTION PROJECT COMMANDING OFFICE t (8') t-/na NDING OFFICE / Office Phone: +86 1064592508

fr^A[ ftt trT t+* ffi IfSfHr4sF - ERA a.s. · ASMGCS in the tower - the implementotion of this system hos led to o noticeoble increose of troffic flow on the oirports surfoces. During

Embed Size (px)

Citation preview

fr^A[ ftt trT t+* ffi IfSfH r4sFTo whom it moy concern

Ero's Multiloterotion svstem in BeUing Copitol Internotionol Airport, Chino

Beijing Copitol Internotionol Airport held o competitive tender in April 2006for on ASMGCS which resulted in o controct oword in October 2006 toPork Air Systems os the successful bidder.

The MLAT system designed os port of the winning tender response of PorkAir Systems wos provided by Ero using their well proven ond robust MSStechnology.

The specific requirements for the MLAT system of Beijing CopitolInternotionol Airport were very stringenf ond demonding in terms ofoccurocy, coveroge ond redundoncy ond the solution design deliveredby Ero met the requiremenfs odmirobly, ond in mony coses exceededthem os well. Due to the complexity of the oirport, the delivered systemhos 26 remote stotions oround the oirport thot delivers MLAT doto to theASMGCS in the tower - the implementotion of this system hos led to onoticeoble increose of troffic flow on the oirports surfoces.

During the project delivery, the MSS of Ero possed Foctory AcceptonceTesting ond ullimotely possed Site Acceptonce Testing ond becomeoperotionol in Morch 2008.

Ero is recognized to be the world's leoder in MLAT technology ond olso orelioble ond communicotive portner. The Ero technicions who instolledthe system ond troined the stoff of Beijing were of o very high colibre ondullimotely, the project wos delivered on time ond within budget.

lf you need ony further informotion, pleose don't hesitofe to contoct me.

Zeng SihongDirectorBEIJING AIRSPACE AND TERMINALRECONSTRUCTION PROJECT COMMANDING OFFICE