“Our know-how was made for
challenging times. Together we can do great things.”
Jacques Melman, Managing Director, with Frames since 1991
FPSO
“FPSOs operate in every corner of the globe, but one thing is the same
across the board: production is becoming increasingly challenging.
Especially in the difficult economic climate we are facing today.
Frames is one of the largest oil and gas solutions providers in the
world. With more than 90 FPSO projects worldwide, we have all the
necessary technology in house for your project, from compact
packages to complete topside modules.
For us and for our clients, it’s necessary to work efficiently and reduce
costs. This is a constant process between technical engineers and
project managers, on both sides. We’re committed to make it work,
now and in the future. For this reason we wrote this white paper on
ways to increase efficiency in production and design of FPSO
topside packages.”
Jacques Melman, Managing Director Frames
Table of Contents
The Situation and the Challenge
• by Subject
• Optimization
• Integration Means Better Design
• Customizing Specifications Without
Compromising
• Staying Safe and Efficient with
New Technology
• Project Management
• Conversion
• Modification
• Reducing Costs in Topside Packages
Russia
Europe
Africa
Brazil
Australia
China
Malaysia
Vietnam
Gulf of Mexico
Frames’ FPSO projects worldwide. Find out more about our FPSO projects.
2 A Family of Oil & Gas Solutions
Efficient Design and Production of FPSO Topside Packages
The Situation and the Challenge
In the last two years, most economies have continued their growth.
For several reasons, oil prices, however, have continued to fall.
This has created a challenge for the Floating Production Storage and
Offloading (FPSO) market and the oil and gas market in general.
New onshore discoveries are at a historic low, and recent technological
advances have enabled offshore exploration into unprecedented
depths. Thus oil and gas companies are moving into new and
increasingly harsh and remote environments to meet the world’s
growing demand for energy. Production in deepwater and ultra-
deepwater has gained the spotlight in the industry. Often the regions
that represent the richest areas of energy resource are also the most
challenging for production.
Their weather conditions and limited transportation
access require more specially designed equipment
for FPSO vessels. Due to the market trends,
however, it is essential to reduce the cost of FPSO
topside packages and increase efficiency.
Skarv FPSO, Courtesy BP
Optimization
Low oil prices are not entirely bad. They drive oil companies, FPSO
contractors, EPCs and equipment providers to refine and improve
technologies, work more efficiently and optimize processes.
Integration Means Better Design
The power of integration lies within the optimization of topside
process packages. Taking control of the complete process and
designing the individual packages as a function of that control will
create improved capabilities, ease of operation, a reliable operating
window, a smaller footprint, lighter designs and faster delivery.
A company that can combine a broad portfolio with a thorough
understanding of gas, oil and water processes can create
synchronization and flexibility between and inside the different
topside packages on an FPSO.
“You don’t buy a car and
ask for the fuel gauge to be
switched over to the other side
of it, and yet that has been the
kind of preferential non-value-
added requests we’ve been
asking of our suppliers.”
Ian Cummins, CEO, BP
4 A Family of Oil & Gas Solutions
Customizing specifications without
compromising
Through time, prescriptive specifications became a restraining demand
on projects in the oil and gas industry. Imposing generic specifications
to specific individual projects leads to unnecessary complications, with
a risk of oversized, overqualified and expensive solutions. Even more
importantly, risk exposure may actually increase, as extra specifica-
tions dilute focus and introduce needless complexity.
A partnership with the solutions provider in the
early stages of the project is essential. With their
unique knowledge base, the solutions provider can
design the right package based on the process and
functional specifications. This also avoids
compromising the functionality, quality, and safety
of the operation.
Solutions
Staying Safe and Efficient with
New Technology
The oil and gas industry has been evolving rapidly
since 1859, when Edwin Drake drilled an oil well
using a cable system. Research and development
have given rise to sophisticated tools and equip-
ment that enable safe, effective exploration and
production. To continually meet the world’s growing
energy needs, research and development have
enabled all aspects of the industry.
Simulation of wave motion with the use of
Computational Fluid Dynamics (CFD) has been an
important development in the FPSO market. This
enabled designing more compact and efficient
separation and other oil and gas treatment pack-
ages. To remain efficient and ensure optimization
in the future, adding new technology to the
portfolio is a must.
Flexible, Compact and
Efficient Separation
During production, water and sand are produced together with the oil
and gas. There are a number of techniques available for separating
these phases. The obvious choice would be a conventional 2 or
3-phase separator. However, this type of separator takes up a large
amount of precious space.
Frames has the solution in the form of its newest and most compact
(inline) technology: the SwirlSep. Unlike competitive technologies, the
patented SwirlSep can be modified remotely and has an extremely
large working range, which makes it easily adjustable to changing well
conditions. Field test at the NAM (Shell/ExxonMobil) in October 2014
proved high separation efficiency and ease of operation. Furthermore,
the motions of an FPSO have no influence on the performance of this
separator. By using a more all-in-one compact separating technique
like SwirlSep, it is possible to reduce costly plot size up to 75 percent.
Find out more about our separation solutions.
Case
3-D rendition of the SwirlSep
6 A Family of Oil & Gas Solutions
Kraken FPSO: Optimization
and Integration
The Kraken oil field, discovered in 1985, is one of the biggest subsea
heavy-oil-field projects under development in the UK sector of the
North Sea. The operator of the field is EnQuest, and they are expecting
first oil in 2017. The Bumi Armada Kraken FPSO, which has a storage
capacity of 600,000 barrels, will process and store crude oil before
offloading it to a shuttle tanker.
Frames provided the produced water treatment skids, slop water
treatment skid, electrostatic coalescers and heat exchangers for the
project. One of the keys to our success was our early involvement
during the FEED phase to optimize the produced water treatment
system in close cooperation with Bumi Armada.
We optimized the produced water treatment skid in
a number of ways. With the integration of two skids
into one module, we reduced the plot by about 15
percent. Our understanding of mechanical
engineering principles led us to suggest adding a
sub-deck and incorporating the equipment into one
module. We also substituted our alternative process
design for the original one, using desanding
cyclones instead of membrane filtration, leading to
a high-performance, compact and cost-efficient
solution.
Find out more about our produced water treatment packages.
Kraken FPSO Produced Water Treatment Skid
Case
Project Management
Studies shows that the majority of oil and gas
projects are facing delays or cost escalations.
Effective project management is one of the defining
factors in reducing costs and controlling deadlines.
It requires the precise coordination of a wide range
of tasks and also guides professionals working
together toward delivering the best outcomes.
In principle, solutions providers need to build wherever the customer
wants them to build. Knowledgeable teams of all disciplines work in
place, overseen by a project manager who is the single point of
contact. This way, the project manager stays in control during the
whole project and can serve as a predictable partner for their clients
worldwide. Access to local offices is an added value for global business
players, providing the flexibility of a small, local operation. Operating
this way, solutions providers can raise the various technologies
in-house, over otherwise restricting boundaries.
Replicantes FPSO P-66, Courtesy Agência Petrobras
8 A Family of Oil & Gas Solutions
Replicantes: Successful Project
Management and Worldwide Presence
Petrobras is finalizing six identical FPSOs that will operate in the
Santos Basin, off the Brazilian coast. The project is also referred to as
Replicantes. Frames provided the molecular sieve gas dehydration unit,
the topside and subsea HPUs, the produced water treatment systems
and chemical injection systems for the modules. We worked in
coordinated multidisciplinary teams that have experience in delivering
single packages as well as integrated solutions such as the total FPSO
topside. Our office in Rio de Janeiro stayed in control and effectively
coordinated project planning, risk and change management.
In this project, we recognized that our local presence increased the
decisiveness of all parties involved. The partnership between Frames,
our local fabricator, EBSE, and the contractors proved to be essential
for equipping the modules to comply with all the local requirements.
The dialogue between the companies was always effective, and we
worked together closely whenever challenges arose, from the engineer-
ing phase to the development of the designs and through the
execution of the work.
“We are seeing a number of
operators trying to engage at
a much earlier stage with
contractors like us…and for
me that’s a really good
opportunity to change the
face of the industry.”
Burno Chabas, CEO, SBM
Find out more about our chemical injection systems.
Case
Replicantes FPSO’s Chemical Injection Skid
Conversion
As one of the biggest challenge for the coming years will be to deliver
cost-effective projects, conversion hulls will more often become the
only economically viable option. When it comes to conversion, a
thorough familiarity with all of the critical processes is crucial.
In addition to designing process topside, a key challenge lies in creat-
ing the optimal combination of reusing, modifying or replacement by
new equipment. This requires substantial know-how and a long-term
vision to keep overall cost competitiveness without compromising
the result.
Modification
Analyzing the topside of critical equipment and
debottlenecking where necessary results in a
cost-effective alternative to new built, useful
for re-deployment of FPSOs.
By modifying topside process equipment the FPSO
can be altered to meet a longer lifespan or become
better equipped to cope with changing field
requirements. Upgrading and retrofitting existing
equipment offers a strategic solution to realize fast
track projects against lower investments.
N’Goma FPSO, Courtesy SBM
10 A Family of Oil & Gas Solutions
Petrojarl: Partnership
and Shared Responsibility
in Conversion
The Petrojarl I is a Teekay Petrojarl–managed FPSO, built in 1986,
that has been active in the North Sea. It will be redeployed for the
Atlanta Field in Brazil.
In this project, the teams of Damen Shiprepair Rotterdam, Nevesbu
and Frames are working in close cooperation throughout the entire
project.
Case
Petrojarl FPSO
Léon van Bossum, Marketing and Sales Director, Frames
“Together with our partners we
have created a new approach
to the FPSO conversion market.”
That is why we are able to act quickly when
design changes are needed, with minimal
impact on the process design, project duration
and costs. The investment in partnerships,
cooperation from an early phase and shared
responsibilities, will result in an optimized
module process and layout designs,
lower module weights and fewer design
uncertainties. In the end this will lead to capital
and operational expenditure reduction for
the end client.
Find out more about our integrated solutions.
FRA1509W1
frames-group.comAbout Frames
At Frames we provide the vital link between well and pipeline.
We design, deliver and construct separation, treatment and control
and monitoring systems as well as total plant solutions and modules
for the international oil and gas market. Our people work directly,
one-on-one, with each client for the best results. Sharp. Together.
Committed.
Reducing Costs in Topside Packages
Here are some simple ways to cut costs.
• Approach contractors as partners.
• Maintain single point contact to avoid communication noise
and delay.
• Share your know-how to improve technology and results.
• Invest in new technologies to reduce plot space, weight
and the need for maintenance.
• Design topside packages as one integrated process.
• Customize the specifications to get the optimal design,
taking into account functionality, quality and safety.
• For conversion, find the optimal balance between re-use,
modification and new build with support of skilled contractors.
Contact
For more information about FPSO topside packages, contact:
Marjan Dekker [email protected] +31 880 033352 or
Felipe Santiago [email protected] +31 172 504956
Learn More
Read all our white papers at frames-group.com/together.