HST_STAB.XLS WESTERN POWER Page 1 07/19/2022 LATTICE TOWER FOUNDATION DESIGN CHECK STABILITY CHECKS Project Description : SF-OC 81 Uprate Prelim. Contractor : WP Support type : 0 deg Susp Tower ntricity of stub leg wrt column centreline : est = 50 ity of slab centreline wrt column centreline : ec = 100 Eccentricity of K-brace wrt top of column : ek = 50 Foundation Type A B C C1 D E E1 F Geometry of column and/or slab Nominal length of column = Lnom (mm) 1448 Maximum length of column = Lmax (mm) 1448 Diameter of column =Dc (mm) 305 Maximum diameter of undercut = Duc (mm) 1500 0.00 Width of concrete pad = Ws (mm) - Breadth of concrete pad = Bs (mm) - Width of undercut to slab = Buc (mm) - Depth of concrete pad = Ds (mm) - Geometry and soil properties for foundation Total depth of foundation = Df (mm) 2286 Depth of soil overburden = Dsoil (mm) 2286 Soil volume reduction for cone interference = Vred 0.00 16 - - Ultimate shear strength soil/soil = Sss (kPa) 85 Ultimate friction concrete/soil = Fcs (kPa) 65 Ultimate friction concrete/rock = Fcr (kPa) - Stub leg valley angle (to vertical) = q (deg) Specific wt of undisturbed soil = gs (kN/m3) Specific wt of backfill material = gbf (kN/m3) Specific wt of rock = gr (kN/m3)

Found Check1

Embed Size (px)

DESCRIPTION

Found Check1

Citation preview

Sheet1LATTICE TOWER FOUNDATION DESIGN CHECK

STABILITY CHECKS

Project Description : SF-OC 81 Uprate Prelim.Contractor : WPSupport type : 0 deg Susp Tower

Eccentricity of stub leg wrt column centreline : est =50Eccentricity of slab centreline wrt column centreline : ec =100Eccentricity of K-brace wrt top of column : ek =50

Foundation TypeABCC1DEE1FGeometry of column and/or slabNominal length of column = Lnom (mm) 1448Maximum length of column = Lmax (mm)1448Diameter of column =Dc (mm) 305Maximum diameter of undercut = Duc (mm) 1500Stub leg valley angle (to vertical) = q (deg)0.00Width of concrete pad = Ws (mm) -Breadth of concrete pad = Bs (mm) -Width of undercut to slab = Buc (mm)-Depth of concrete pad = Ds (mm) -Geometry and soil properties for foundationTotal depth of foundation = Df (mm) 2286Depth of soil overburden = Dsoil (mm) 2286Soil volume reduction for cone interference = Vred (m3)0.00Specific wt of undisturbed soil = gs (kN/m3) 16Specific wt of backfill material = gbf (kN/m3) -Specific wt of rock = gr (kN/m3) -Ultimate shear strength soil/soil = Sss (kPa) 85Ultimate friction concrete/soil = Fcs (kPa) 65Ultimate friction concrete/rock = Fcr (kPa) -Ultimate bearing capacity for soil = Pult (kPa) 600

LATTICE TOWER FOUNDATION DESIGN CHECK

STABILITY CHECKS

Project Description : SF-OC 81 Uprate Prelim.Contractor : WPSupport type : o Susp Tower

Foundation TypeABCC1DEE1FGeotechnical design loads for foundationMaximum thrust GDL = GDLc (kN) 239.1Maximum uplift GDL = GDLu (kN)187.1Maximum lateral GDL = GDLh (kN)42.3FOS calculations for foundationWeight of concrete = Wc (kN) 2.67Weight of soil = Wsoil (kN)242Weight of backfill = Wbf (kN)0Weight of rock = Wr (kN)0Shear capacity of cylinder under uplift = Scyu (kN)916Shear capacity of cylinder under compression = Scyc (kN)142Minimum uplift resistance = Ru (kN)245Maximum overturning moment = Mot (kNm)-Resisting moment = Mres (kNm)-Total vertical load acting @ base under thrust = Ptot (kN)243Bearing stress beneath column or slab = fp* (kPa)57Factors of safety and foundation statusFOS against uplift failure = FOSu1.31Status of foundation for upliftOKFOS against bearing failure = FOSc10.58Status of foundation for bearingOKFOS against overturning failure = FOSot4.35Status of foundation for overturningOK

Interference Volume Calculations for Overlapping Soil Frusta

Foundation type : Type =MC ("B" for bored,"MC" for mass concrete)Tower width between lowest K-Brace points: B =2500mmSlope of leg relative to vertical: a =2.41degAngle for failure cone measured from vertical: F =30degDepth of foundation: D =2600mmLength of column: Lcol =2900mmDiameter of undercut or column: Duc =1500mm

X =1372mmHi =1523mmRadius=2251mm2q =105degLarc =4121mma=622mmb=879mmc=1366mmd=1501mmAseg =2.92m2Vinter =1.82m3