Forward Calorimeter Layer Sum BoardsPhase I UpgradeLAr Internal Review

J. Rutherfoord29 May 2015

Page 2: Forward Calorimeter Layer Sum Boards Phase I Upgrade LAr Internal Review J. Rutherfoord 29 May 2015

23 September 2014 J. Rutherfoord 2

FCal LSBs for Phase I

Goals of the Phase I upgradeDescription of the baselinePresent status

Page 3: Forward Calorimeter Layer Sum Boards Phase I Upgrade LAr Internal Review J. Rutherfoord 29 May 2015

J. Rutherfoord 3

One FCal1 -slice

28 May 2015

Now

Proposed

Now just 4 trigger towers per -slice

Will be 12 trigger towers per -slice

Page 4: Forward Calorimeter Layer Sum Boards Phase I Upgrade LAr Internal Review J. Rutherfoord 29 May 2015

FCal front-end is different

Trigger summing No summing in depth All LSB inputs are individually weighted

by sin() – Of order 10 variation

23 September 2014 J. Rutherfoord 4

Page 5: Forward Calorimeter Layer Sum Boards Phase I Upgrade LAr Internal Review J. Rutherfoord 29 May 2015

FCal Layer Sum Bds

Layer Sum Boards will provide finer segmentation, i.e. less summing.Will maintain legacy summing

23 September 2014 J. Rutherfoord 5

Layer Sum Board

Page 6: Forward Calorimeter Layer Sum Boards Phase I Upgrade LAr Internal Review J. Rutherfoord 29 May 2015

FCal1 LSB Schematic

23 September 2014 J. Rutherfoord 6

Page 7: Forward Calorimeter Layer Sum Boards Phase I Upgrade LAr Internal Review J. Rutherfoord 29 May 2015

FCal1 Phase I Layer Sum Board

23 September 2014 J. Rutherfoord 7

Page 8: Forward Calorimeter Layer Sum Boards Phase I Upgrade LAr Internal Review J. Rutherfoord 29 May 2015

23 September 2014 J. Rutherfoord 8

Dynamic range

Table is everywhere in units of ET

In FCal, kinematic limit determined at s = 14 TeVChoose pT = 512 GeV as upper limit for all FCal trigger towers for now No saturation!Use shaper linear mixer output upper limit of 3.0 VSet linear mixer gains as low, hi, hi

Page 9: Forward Calorimeter Layer Sum Boards Phase I Upgrade LAr Internal Review J. Rutherfoord 29 May 2015

Resistor values assuming 512 GeV pT and linear mixer 3.00 V

23 September 2014 J. Rutherfoord 9

Page 10: Forward Calorimeter Layer Sum Boards Phase I Upgrade LAr Internal Review J. Rutherfoord 29 May 2015

Test (dummy) boards

Front-End Board (with LSB slots)Calibration board Input from pulse generator to mux

which drives 128 lines

LTDB with mux from inputs to output to digital scope

23 September 2014 J. Rutherfoord 10

Page 11: Forward Calorimeter Layer Sum Boards Phase I Upgrade LAr Internal Review J. Rutherfoord 29 May 2015

“Dummy” Front End Board layout

23 September 2014 J. Rutherfoord 11

Page 12: Forward Calorimeter Layer Sum Boards Phase I Upgrade LAr Internal Review J. Rutherfoord 29 May 2015

FCal1 prototype Phase 1 LSB

23 September 2014 J. Rutherfoord 12

Input: pin 02Output: pin 49

Rise: 35 nsAmp: 2.5 Vpp

Only one power and one ground pin connected for this test.

100 ns

2.5 V

Page 13: Forward Calorimeter Layer Sum Boards Phase I Upgrade LAr Internal Review J. Rutherfoord 29 May 2015

FCal1 LSB prototype: Normal x-talk

23 September 2014 J. Rutherfoord 13

Input: 2.5 VppOutput: 3 mVpp

0.1% x-talk

100 ns

5 mV

2.5 V

Page 14: Forward Calorimeter Layer Sum Boards Phase I Upgrade LAr Internal Review J. Rutherfoord 29 May 2015

FCal1 LSBOnly case of bad x-talk

23 September 2014 J. Rutherfoord 14

Input: 2.5 VppOutput: 50 mVpp

2% x-talk

100 ns

50 mV

2.5 V

Page 15: Forward Calorimeter Layer Sum Boards Phase I Upgrade LAr Internal Review J. Rutherfoord 29 May 2015

23 September 2014 J. Rutherfoord 15

Present status

FCal1 LSB pcb stuffed and tested Flaw – One channel in one location has

cross-talk exceeding specs. Easy to fix. Possible mix-up on which pair to sum.

Three dummy FEB pcbs stuffed – ready to test