FORM I For SHANTA SRIRAM TECH PARK(Commercial Complex) At Gachibowli Village, Serilingampally Mandal, Ranga Reddy District, Telangana MAY 2017 PROJECT PROPONENT ENVIRONMENT CONSULTANT SHANTA SRIRAM CONSTRUCTIONS PVT. LTD., Hyderabad, Telangana. B.S. ENVI-TECH PVT. LTD., Secunderabad, Telangana. NABET Accreditation: NABET/EIA/1316/RA002

FORM Ienvironmentclearance.nic.in/writereaddata/Online/TOR/21_Feb_2018_160644530Y7EQLA6Q...Form - I (As Per New Notification of Mo.E.F dated 1-12-2009 vide SO 3067 (E)) ... As per

  • Upload
    others

  • View
    5

  • Download
    1

Embed Size (px)

Citation preview

Page 1: FORM Ienvironmentclearance.nic.in/writereaddata/Online/TOR/21_Feb_2018_160644530Y7EQLA6Q...Form - I (As Per New Notification of Mo.E.F dated 1-12-2009 vide SO 3067 (E)) ... As per

FORM – I

For

“SHANTA SRIRAM – TECH PARK” (Commercial Complex)

At Gachibowli Village, Serilingampally Mandal,

Ranga Reddy District, Telangana

MAY – 2017

PROJECT PROPONENT ENVIRONMENT CONSULTANT

SHANTA SRIRAM CONSTRUCTIONS PVT. LTD., Hyderabad, Telangana.

B.S. ENVI-TECH PVT. LTD., Secunderabad, Telangana. NABET Accreditation: NABET/EIA/1316/RA002

Page 2: FORM Ienvironmentclearance.nic.in/writereaddata/Online/TOR/21_Feb_2018_160644530Y7EQLA6Q...Form - I (As Per New Notification of Mo.E.F dated 1-12-2009 vide SO 3067 (E)) ... As per

2

Form - I (As Per New Notification of Mo.E.F dated 1-12-2009 vide SO 3067 (E))

BASIC INFORMATION

S. No

Item Details

1 Name of the Project/s Commercial complex titled

“Shanta Sriram – Tech Park”

developed by

Shanta Sriram Constructions Pvt. Ltd

(SSCPL)

2 S. No. in the schedule 8(a)

3 Proposed capacity/ area/

length/ tonnage to be

handled/ command area/

lease area/ number of wells to

be drilled

Background

SSCPL constructed a commercial

complex titled “Shanta Sriram - Tech

Park” to be accommodated on a plot

area of 2.07 Acres.

This project is a violation case. A court

case was filed by Telangana Pollution

Control Board in the year 2016. The

judgement was declared on 31.08.2016

with a penalty.

The project did not obtain

Environmental Clearance from SEIAA,

Telangana. However it had constructed

the commercial complex in the year

2016.

Details are furnished in Annexure – 1.

Plot Area : 8395.94 Sq.m

Built-up Area : 52367.98 Sq.m

Building Height : 30 m

IT office and Services

Block A and Block B with (Three

Basements + Ground Floor – Seven

Floors)

Page 3: FORM Ienvironmentclearance.nic.in/writereaddata/Online/TOR/21_Feb_2018_160644530Y7EQLA6Q...Form - I (As Per New Notification of Mo.E.F dated 1-12-2009 vide SO 3067 (E)) ... As per

3

Parking details

Parking Area : 18810.00 Sq.m

Two Wheeler : 225

Four Wheeler : 570

Commercial complex comprising IT

office and Services. The details of the

commercial complex are furnished in

the Annexure – 2.

4 New/ expansion/

modernization

New

5 Existing capacity/ Area etc. Not Applicable

6 Category of Project i.e „A‟ or „B‟ Category „B‟ 7 Does it attract the general

condition? If yes please

specify.

No

8 Does it attract the specific

condition? If yes please

specify.

No

9 Location Location Map of the project site is given

in Annexure – 3.

10 km Radius Map of Survey of India

(SOI) toposheet of the project site is

given in Annexure – 3A.

Google Earth Imagery of the project is

given in Annexure – 3B.

As per GHMC master plan the survey

numbers are designated for commercial

use. The copy of the letter from GHMC

is given in Annexure – 3C.

Photographs of the project site are given

in Annexure – 3D.

Plot/ Survey/ Khasra No 126

Village Gachibowli Village

Tehsil Serilingampally Mandal

District Ranga Reddy

State Telangana

10 Nearest railway station/

airport along with distance in

Kms.

Hitec City Railway Station 4.10 km –

NE

Page 4: FORM Ienvironmentclearance.nic.in/writereaddata/Online/TOR/21_Feb_2018_160644530Y7EQLA6Q...Form - I (As Per New Notification of Mo.E.F dated 1-12-2009 vide SO 3067 (E)) ... As per

4

11 Nearest town, city, district

headquarters along with

distance in kms.

Hyderabad – 15.58 km – SE

12 Village panchayaths, Zilla

parishad, Municipal

Corporation, Local body

(Complete postal addresses

with telephone nos. to be

given)

Gachibowli Village, Serilingampally

Mandal, Ranga Reddy District,

Telangana.

13 Name of the applicant Shanta Sriram Constructions Private

Limited (SSCPL)

14 Registered address M/s. Shanta Sriram Constructions Pvt.

Ltd., 501, Oasis Centre, Somajiguda,

Begumpet Main Road, Opp. Pullareddy

Sweets, Hyderabad – 500016,

Telangana.

15 Address for correspondence Same as above

Name Mr. M. Narsaiah

Designation (Owner /Partner/

CEO)

Managing Director

Address 501, Oasis Centre, Somajiguda,

Begumpet Main Road, Opp. Pullareddy

Sweets, Hyderabad – 500016,

Telangana.

Pincode 500016

E- mail [email protected]

Tele-Fax. +91- 9849955881

16 Details of Alternative sites

examined, if any location of

these sites should be shown

on a toposheet.

Not Applicable, since it is a building

project.

17 Interlinked projects Not Applicable.

18 Whether separate application

of interlinked project has been

submitted?

Not Applicable.

19 If yes, date of submission Not Applicable.

20 If no, reason Not Applicable.

21 Whether the proposal involves

approval/ clearance under: if

yes, details of the same and

their status to be given.

Not Applicable.

Page 5: FORM Ienvironmentclearance.nic.in/writereaddata/Online/TOR/21_Feb_2018_160644530Y7EQLA6Q...Form - I (As Per New Notification of Mo.E.F dated 1-12-2009 vide SO 3067 (E)) ... As per

5

(a) The Forest

(Conservation)Act, 1980

(b) The Wild Life

(Protection)Act, 1972

(c) The CRZ Notification,

1991

22 Whether there is any

Government Order/ Policy

relevant/ relating to the site?

Not Applicable.

23 Forest land involved (hectares) Nil.

24 Whether there is any litigation

pending against the project

and/or land in which the

project is propose to be set

up?

(a) Name of the court

(b) Case No

(c) Orders/ directions of the

court, if any and its relevance

with the proposed project.

Name of the

court

IV AJCJ – CUM – XXV

Metropolitan Magistrate,

Cyberabad, Kukatpally,

Miyapur

Case No 1082/2016

Court Order

received

31st Aug 2016

The copy of court order is given in

Annexure – 4.

25 Estimated Cost of Project Rs. 150 Crores

(I) Activity

1. Construction, operation or decommissioning of the Project involving

actions, which will cause physical changes in the locality (Topography,

land use, changes in water bodies, etc.)

S.No Information/Checklist

confirmation

Yes/No

Details thereof (with

approximate quantities /rates,

wherever possible) with source

of information data

1.1 Permanent or temporary

change in land use, land cover

or topography including

increase in intensity of land

use (with respect to local

land use plan)

Yes SSCPL constructed a commercial

complex titled “Shanta Sriram – Tech Park” on a plot area of

8395.94 Sq.m. (2.07 Acres)

Commercial complex comprising

two blocks of IT office and

Services (Three Basements +

Ground Floor – Seven Floors).

1.2 Clearance of existing land,

vegetation and buildings?

No Not Applicable.

Page 6: FORM Ienvironmentclearance.nic.in/writereaddata/Online/TOR/21_Feb_2018_160644530Y7EQLA6Q...Form - I (As Per New Notification of Mo.E.F dated 1-12-2009 vide SO 3067 (E)) ... As per

6

1.3 Creation of new land uses?

Yes The land use of the site is

earmarked as commercial

development as per GHMC,

Hyderabad

The master plan of the project is

given in Annexure – 5.

1.4 Pre-construction investigations

e.g. bore houses, soil testing?

No Not Applicable.

1.5 Construction works?

Yes Built-up area : 52367.98 Sq.m

Please refer Annexure – 2.

1.6 Demolition works? No Not Applicable.

1.7 Temporary sites used for

construction works or housing

of construction workers?

No Not Applicable. The construction

of the Shanta Sriram – Tech Park

was already completed.

1.8 Above ground buildings,

structures or earthworks

including linear structures, cut

and fill or excavations

Yes The project will have two blocks

namely A and B with Three

Basements + Ground floor –

Seven Floors. Please refer

Annexure – 2.

1.9 Underground works including

mining or tunneling?

No Not Applicable.

1.10 Reclamation works? No Not Applicable.

1.11 Dredging? No Not Applicable.

1.12 Offshore structures? No Not Applicable.

1.13 Production and manufacturing

processes?

No No production / manufacturing

process are involved. This is a

building construction project.

1.14 Facilities for storage of goods or materials?

No Not Applicable. The construction

of the project was already

completed.

1.15 Facilities for treatment or

disposal of solid waste or

liquid effluents?

Yes Liquid Waste:

Operation Phase:

The wastewater generated during

operation phase will be treated to

conform to TSPCB standards in a

sewage treatment plant. Treated

wastewater will be disposed to

existing sewer line.

Page 7: FORM Ienvironmentclearance.nic.in/writereaddata/Online/TOR/21_Feb_2018_160644530Y7EQLA6Q...Form - I (As Per New Notification of Mo.E.F dated 1-12-2009 vide SO 3067 (E)) ... As per

7

Solid Waste

Operation Phase:

The solid wastes generated during

operation phase will consist of

mainly used paper, cartons,

thermocol, plastics, polythene

bags, corrugated boxes, glass,

and organic waste from kitchen.

Solid waste generation calculation

is enclosed as Annexure – 6.

The inorganic wastes will be

disposed to authorize vendors for

recycling and the organic wastes

will be disposed to local municipal

authorities.

1.16 Facilities for long term housing

of operational workers?

No Not Applicable.

1.17 New road, rail or sea traffic

during construction or

operation?

No Not Applicable.

1.18 New road, rail, air waterborne

or other transport

infrastructure including new

or altered routes and stations,

ports, airports etc?

No Not Applicable.

1.19 Closure or diversion of existing

transport routes or

infrastructure leading to

changes in traffic

movements?

No Not Applicable.

1.20 New or diverted transmission

lines or pipelines?

No Not Applicable.

1.21 Impoundment, damming,

culverting, realignment or

other changes to the hydrology

of watercourses or aquifers?

No Not Applicable.

1.22 Stream crossings? No Not Applicable.

Page 8: FORM Ienvironmentclearance.nic.in/writereaddata/Online/TOR/21_Feb_2018_160644530Y7EQLA6Q...Form - I (As Per New Notification of Mo.E.F dated 1-12-2009 vide SO 3067 (E)) ... As per

8

1.23 Abstraction or transfers of

from ground or surface

waters?

No Not Applicable.

1.24 Changes in water bodies or the

land surface affecting drainage

or run-off?

No Not Applicable.

1.25 Transport of personnel or

materials for construction,

operation or decommissioning?

No Not Applicable. The construction

of the project was already

completed.

1.26 Long-term dismantling or

decommissioning or

restoration works?

No Not Applicable.

1.27 Ongoing activity during

decommissioning which could

have an impact on the

environment?

No Not Applicable.

1.28 Influx of people to an area in

either temporarily or

permanently?

Yes There will be influx of people

during operation.

1.29 Introduction of alien species? No Not Applicable.

1.30 Loss of native species or

genetic diversity?

No Not Applicable.

1.31 Any other actions? No Not Applicable.

2. Use of Natural resources for construction or operation of the Project

(such as land, water, materials or energy, especially any resources

which are non-renewable or in short supply):

S. No.

Information/checklist

confirmation

Yes/No

Details thereof (with

approximate quantities /rates,

wherever possible) with source

of information data

2.1 Land especially undeveloped or

agricultural land (ha)

No Commercial complex titled

“Shanta Sriram – Tech Park” was

already completed in an area of

2.07 Acres. Commercial complex

comprising IT office and Services.

Please refer Annexure – 2.

2.2 Water (expected source &

competing users) unit: KLD

Yes Total water requirement of the

project during operation phase is

estimated 205 klpd which is

sourced from HMWS&SB/Private

Page 9: FORM Ienvironmentclearance.nic.in/writereaddata/Online/TOR/21_Feb_2018_160644530Y7EQLA6Q...Form - I (As Per New Notification of Mo.E.F dated 1-12-2009 vide SO 3067 (E)) ... As per

9

tanker.

The fresh water requirement is

205 klpd. A STP of 175 klpd

capacity has already constructed.

It is estimated that about 115

klpd of treated wastewater is

disposed to existing sewer line.

The details of the water

requirement are furnished in the

Annexure – 7.

2.3 Minerals (MT) No Not Applicable

2.4 Construction material – stone,

aggregates, sand / soil

(expected source – MT)

No Not Applicable. Since the

construction is completed.

2.5 Forests and timber (source –

MT)

No Not required.

2.6 Energy including electricity and

fuels (source, competing users)

Unit: fuel (MT), energy (MW)

Yes The estimated power requirement

for the project is 3400 kVA. The

details of the power requirement

are furnished in the

Annexure – 8.

2.7 Any other natural resources

(use appropriate standard

units)

No Not Applicable.

3. Use, storage, transport, handling or production of substances or

materials, which could be harmful to human health or the environment

or raise concerns about actual or perceived risks to human health.

S. No.

Information/Checklist confirmation

Yes/No

Details thereof (with approximate quantities/ rates, wherever possible) with source of information data

3.1 Use of substances or materials,

which are hazardous (as per

MSIHC rules) to human health

or the environment (flora,

fauna, and water supplies)

Yes Used batteries, used lube oil from

DG sets.

3.2 Changes in occurrence of

disease or affect disease vectors

(e.g. insect or water borne

diseases)

No Nil.

Page 10: FORM Ienvironmentclearance.nic.in/writereaddata/Online/TOR/21_Feb_2018_160644530Y7EQLA6Q...Form - I (As Per New Notification of Mo.E.F dated 1-12-2009 vide SO 3067 (E)) ... As per

10

3.3 Affect the welfare of people e.g.

by changing living conditions?

Yes The project will result in

secondary employment in terms

of service providers/facilities

management.

Employment Number of

persons

Operation phase 30

3.4 Vulnerable groups of people

who could be affected by the

project e.g. hospital patients,

children, the elderly etc.,

No Nil.

3.5 Any other causes No Nil.

4. Production of solid wastes during construction or operation or

decommissioning (MT/month)

S. No.

Information/Checklist

confirmation

Yes/No

Details thereof (with

approximate quantities/ rates,

wherever possible) with source

of information data

4.1 Spoil, overburden or mine

wastes

No Not Applicable.

4.2 Municipal waste (domestic and

or commercial wastes)

Yes The solid wastes generated during

operation phase will consist of

mainly used paper, cartons,

thermocol, plastics, polythene

bags, corrugated boxes, glass,

and organic waste from kitchen.

Please refer Annexure – 4.

The inorganic wastes will be

disposed to authorize vendors for

recycling and the organic wastes

will be disposed to local municipal

authorities.

4.3 Hazardous wastes (as per

Hazardous Waste

Management Rules)

Yes No hazardous waste will be

released from the project except

used oil from DG sets.

4.4 Other industrial process wastes No Not Applicable.

4.5 Surplus product No Not Applicable.

4.6 Sewage sludge or other sludge

from effluent treatment

Yes Dewatered/dried sludge from STP

(Sewage Treatment Plant) will be

Page 11: FORM Ienvironmentclearance.nic.in/writereaddata/Online/TOR/21_Feb_2018_160644530Y7EQLA6Q...Form - I (As Per New Notification of Mo.E.F dated 1-12-2009 vide SO 3067 (E)) ... As per

11

disposed to local vendors.

4.7 Construction or demolition

wastes

No Not Applicable.

4.8 Redundant machinery or

equipment

No Not Applicable

4.9 Contaminated soils or other

materials

No Not applicable

4.10 Agricultural wastes No Not Applicable

4.11 Other solid wastes No Not Applicable

5. Release of pollutants / hazardous, toxic or noxious substances to air

(Kg/hr)

S. No.

Information/Checklist confirmation

Yes/No

Details thereof (with approximate quantities/ rates, wherever possible) with source of information data

5.1 Emissions from combustion of

fossil fuels from stationary or

mobile sources

Yes The operation of project does not

envisage any air pollution sources

except emission from emergency

backup DG sets.

5.2 Emissions from production

processes

No Not Applicable, since it is a

building project.

5.3 Emissions from materials

handling including storage or

transport

No Not Applicable.

5.4 Emissions from construction

activities including plant and

equipment

No Not Applicable.

5.5 Dust or odours from handling of materials including construction materials, sewage and waste

No Not Applicable.

5.6 Emissions from incineration of

waste

No Not Applicable.

5.7 Emissions from burning of

waste in open air (e.g. slash

materials, construction debris)

No Not Applicable.

5.8 Emissions from any other

sources

No Not Applicable.

Page 12: FORM Ienvironmentclearance.nic.in/writereaddata/Online/TOR/21_Feb_2018_160644530Y7EQLA6Q...Form - I (As Per New Notification of Mo.E.F dated 1-12-2009 vide SO 3067 (E)) ... As per

12

6. Generation of Noise and Vibration, and Emissions of Light and Heat:

S. No.

Information/Checklist

confirmation

Yes/No

Details thereof (with

approximate quantities/ rates,

wherever possible) with source

of information data with source

of information data

6.1 From operation of equipment

e.g. engines, ventilation plant,

crushers

No Not Applicable

6.2 From industrial or similar

processes

No Not Applicable.

6.3 From construction or

demolition

No Not Applicable.

6.4 From blasting or piling No Not Applicable.

6.5 From construction or

operational traffic

No Not Applicable.

6.6 From lighting or cooling

systems

No Not applicable

6.7 From any other sources No Not applicable

7. Risks of contamination of land or water from releases of pollutants into

the ground or into sewers, surface waters, groundwater, coastal waters

or the sea:

S. No.

Information/Checklist

confirmation

Yes/No

Details thereof (with

approximate quantities/rates,

wherever possible) with source

of information data

7.1 From handling, storage, use or

spillage of hazardous materials

No Not Applicable.

7.2 From discharge of sewage or

other effluents to water or the

land (expected mode and place

of discharge)

Yes Treated wastewater will be disposed

into the nearby sewer line.

7.3 By deposition of pollutants

emitted to air into the land or

into water

Yes Emission from DG sets.

7.4 From any other sources No The waste water is treated in a

STP and discharged into the

sewer line.

Page 13: FORM Ienvironmentclearance.nic.in/writereaddata/Online/TOR/21_Feb_2018_160644530Y7EQLA6Q...Form - I (As Per New Notification of Mo.E.F dated 1-12-2009 vide SO 3067 (E)) ... As per

13

7.5 Is there a risk of long term

buildup of pollutants in the

environment from these

sources?

No None.

8. Risk of accidents during construction or operation of the Project,

which could affect human health or the environment

S. No.

Information/Checklist

confirmation

Yes/No

Details thereof (with

approximate quantities/rates,

wherever possible) with source

of information data

8.1 From explosions, spillages, fires

etc from storage, handling, use

or production of hazardous

substances

No Not Applicable.

8.2 From any other causes No None.

8.3 Could the project be affected by

natural disasters causing

environmental damage (e.g.

floods, earthquakes, landslides,

cloudburst etc.)?

No The project is in inland area. The

project site falls under Zone II,

according to the Standard India

Seismic Zone Map (2014). The

structures shall be designed with

adequate safety factors.

9. Factors which should be considered (such as consequential

development) which could lead to environmental effects or the

potential for cumulative impacts with other existing or planned

activities in the locality

S. No.

Information/Checklist

confirmation

Yes/No

Details thereof (with

approximate quantities/ rates,

wherever possible) with source

of information data

9.1 Lead to development of supporting utilities, ancillary development or development stimulated by the project which could have impact on the environment e.g.: Supporting infrastructure (roads, power supply, waste or waste water treatment, etc.)

Yes

Supporting infrastructure within the project site will be developed.

Page 14: FORM Ienvironmentclearance.nic.in/writereaddata/Online/TOR/21_Feb_2018_160644530Y7EQLA6Q...Form - I (As Per New Notification of Mo.E.F dated 1-12-2009 vide SO 3067 (E)) ... As per

14

Housing development Yes This project will provide impetus for housing development in surrounding areas.

Extractive industries No Not Applicable

Supply industries No Not Applicable

Other Yes Unskilled/semiskilled/skilled

labour will be employed for facility

maintenance services and other

services.

9.2 Lead to after-use of the site, which could have an impact on the environment

No Not applicable.

9.3 Set a precedent for later developments

No Not Applicable.

9.4 Have cumulative effects due to proximity to other existing or planned projects with similar effects

Yes The area is earmarked for commercial use as per GHMC master plan.

(II) Environmental Sensitivity

S. No.

Areas Name/ Identity

Aerial distance (within 15 km.) project location boundary

1 Areas protected under

international conventions,

national or local legislation for

their ecological, landscape,

cultural or other related value

Golconda Fort

Qtub Shahi Tombs

Charminar

Mecca Masjid

Chowmahalla Palace

Birla Temple

8.50 km – SSE

7.00 km – SSE

15.80 km – SE

15.40 km – SE

15.70 km – SE

12.90 km – E

2 Areas which are important or

sensitive for ecological reasons

- Wetlands, watercourses or

other water bodies, coastal

zone, biospheres, mountains,

forests

Water Bodies

Musi River

Hussain Sagar

Durgam Cheruvu

Himayatsagar

Osman Sagar

Suraram Cheruvu

Pedda Cheruvu

7.00 km – S

11.60 km – ESE

3.50 km – SE

11.40 km – S

7.50 km – SW

4.80 km – E

2.70 km – SSE

Page 15: FORM Ienvironmentclearance.nic.in/writereaddata/Online/TOR/21_Feb_2018_160644530Y7EQLA6Q...Form - I (As Per New Notification of Mo.E.F dated 1-12-2009 vide SO 3067 (E)) ... As per

15

Kamunoni Cheruvu

Maisamma Cheruvu

Nerla Cheruvu

Gopi Cheruvu

Nallagandla

Cheruvu

ICRISAT Lake

Vanam Cheruvu

Mella Cheruvu

Kotha Cheruvu

5.10 km – ENE

6.10 km – ENE

1.60 km – NNE

3.8 km – NW

4.6 km – WNW

10.0 km – WNW

7.4 km – WNW

7.5 km – WNW

7.5 km – SW

Reserved Forest

(RF)

Kottaguda RF

Gaganpahad RF

Domnair RF

Chilkur Protected

Forest

8.50 km – SSE

9.00 km – S

3 Areas used by protected,

important or sensitive species

of flora or fauna for breeding,

nesting, foraging, resting, over

wintering, migration

Mrugavani National

Park

Kasu Brahmananda

Reddy National Park

Nehru Zoological

Park

10.77 km – SSW

6.80 km – ESE

14.0 km – SE

4 Inland, coastal, marine or

underground waters

Inland Not Applicable.

5 State, National boundaries Telangana –

Karnataka

(State Boundary)

70.0 km – W

6 Routes or facilities used by the

public for access to recreation

or other tourist, pilgrim areas

None Not Applicable

7 Defence installations Greyhound facility 9.50 km – SSW

8 Densely populated or built-up

area

Hyderabad

Population –

39,43,323

Ranga Reddy

District Population –

52,96,741

Census Data – 2011

15.58 km –SE

Page 16: FORM Ienvironmentclearance.nic.in/writereaddata/Online/TOR/21_Feb_2018_160644530Y7EQLA6Q...Form - I (As Per New Notification of Mo.E.F dated 1-12-2009 vide SO 3067 (E)) ... As per

16

9 Areas occupied by sensitive

man-made land uses

(hospitals, schools, places of

worship, community facilities)

Schools

NASR Boys school

Euro School

The Gaudium school

Oakridge

International School

Meridian School

Green Gables

International School

Hillside School

Rockwell

International School

1.86 km – ESE

2.46 km – SE

2.76 km – SSW

3.20 km – SSE

3.21 km – ENE

3.88 km – ENE

4.64 km – SE

4.73 km – ESE

Colleges

International

Institute of

Information

Technology

Indian School of

Business

National Institute of

Fashion Technology

Sri Venkateshwara

College of Pharmacy

0.68 km – W

2.00 km – SW

3.07 km – ENE

3.22 km – ESE

Hospitals

Himagiri Hospital

KIMS hospital

Pace Hospital

Care Hospital

Omni Hospital

Citizen Hospital

Srikara Hospital

0.60 km – SE

2.53 km – NE

3.14 km – E

2.55 km – SE

4.79 km – E

5.37 km – NW

5.01 km – NNW

Page 17: FORM Ienvironmentclearance.nic.in/writereaddata/Online/TOR/21_Feb_2018_160644530Y7EQLA6Q...Form - I (As Per New Notification of Mo.E.F dated 1-12-2009 vide SO 3067 (E)) ... As per

17

10 Areas containing important,

high quality or scarce resources

(ground water resources,

surface resources, forestry,

agriculture, fisheries, tourism,

minerals)

Water Bodies

Musi River

Hussain Sagar

Durgam Cheruvu

Himayatsagar

Osman Sagar

Suraram Cheruvu

Pedda Cheruvu

Kamunoni Cheruvu

Maisamma Cheruvu

Nerla Cheruvu

Gopi Cheruvu

Nallagandla

Cheruvu

ICRISAT Lake

Vanam Cheruvu

Mella Cheruvu

Kotha Cheruvu

7.00 km – S

11.60 km – ESE

3.50 km – SE

11.40 km – S

7.50 km – SW

4.80 km – E

2.70 km – SSE

5.10 km – ENE

6.10 km – ENE

1.60 km – NNE

3.8 km – NW

4.6 km – WNW

10.0 km – WNW

7.4 km – WNW

7.5 km – WNW

7.5 km – SW

11 Areas already subjected to

pollution or environmental

damage. (those where existing

legal environmental standards

are exceeded)

None Not Applicable

12 Areas susceptible to natural

hazard which could cause

the project to present

environmental problems

(earthquakes, subsidence,

landslides, erosion, flooding or

extreme or adverse climatic

conditions)

Nil. The project area

is inland and falls

under Zone II,

according to the

Standard India

Seismic Zone Map

(2014).

Not Applicable

Page 18: FORM Ienvironmentclearance.nic.in/writereaddata/Online/TOR/21_Feb_2018_160644530Y7EQLA6Q...Form - I (As Per New Notification of Mo.E.F dated 1-12-2009 vide SO 3067 (E)) ... As per
Page 19: FORM Ienvironmentclearance.nic.in/writereaddata/Online/TOR/21_Feb_2018_160644530Y7EQLA6Q...Form - I (As Per New Notification of Mo.E.F dated 1-12-2009 vide SO 3067 (E)) ... As per

PROJECT PROPONENT : Shanta Sriram Construction Pvt. Ltd

PROJECT NAME : Shanta Sriram – Tech Park

LOCATION : Gachibowli Village, Serilingampally

Mandal, Ranga Reddy District, Telangana

SUBJECT : Form 1

LIST OF ANNEXURES

S. No. ANNEXURES NUMBER

DESCRIPTION

1. Annexure – 1 Chronology of the project

2. Annexure – 2 Facilities of the Tech Park

3. Annexure – 3 Location Map

4. Annexure – 3A 10 km Radius Map

5. Annexure – 3B Google Earth Imagery

6. Annexure – 3C Copy of HMDA letter

7. Annexure – 3D Photographs of the site

8. Annexure – 4 Copy of the court order

9. Annexure – 5 Master plan of the project

10. Annexure – 6 Solid waste generation

11. Annexure – 7 Water and wastewater balance

12. Annexure – 8 Power requirement

Page 20: FORM Ienvironmentclearance.nic.in/writereaddata/Online/TOR/21_Feb_2018_160644530Y7EQLA6Q...Form - I (As Per New Notification of Mo.E.F dated 1-12-2009 vide SO 3067 (E)) ... As per

ANNEXURE – 1

PROJECT PROPONENT : Shanta Sriram Construction Pvt. Ltd

PROJECT NAME : Shanta Sriram – Tech Park

LOCATION : Gachibowli Village, Serilingampally

Mandal, Ranga Reddy District, Telangana

SUBJECT : Chronology of the project

COMMERCIAL COMPLEX SHANTA SRIRAM – TECH PARK

S.No. Description Status

1. Date of Land Acquisition 2005

2. Date of Application to GHMC for plan

approval (Old)

2008

3. Date of Application to GHMC for plan

approval (Revised)

2013

4. Permit No. (Old - 2008) G/104/BP/WZ/447/08

5. Date of GHMC plan Approval (Old

2008)

23.09.2008

6. Application No. (Revised 2013) 62846/24/07/2013/HO

7. Permit No. (Revised 2013) 40076/HO/WZ/Cir-11/2015

8. Date of GHMC plan Approval 13.03.2015

9. Date of start of construction 2005

10. Date of completion of construction 2016

11. Application to SEIAA, AP 27.07.2013

12. Letter vide No. SEIAA/AP/RRD-2013-3786

13. SEIAA, Andhra Pradesh letter dated 25.09.2013

14. Court case filed by Department of

Environment

May 2016

15. Name of the court IV AJCJ – CUM – XXV

Metropolitan Magistrate,

Cyberabad, Kukatpally,

Miyapur

16. Court Case No. 1082/2016

17. Status of the court case Court case was cleared on

31.08.2016

18. Court order Penalty of Rs. 30,000/- was

paid by the project proponent

Page 21: FORM Ienvironmentclearance.nic.in/writereaddata/Online/TOR/21_Feb_2018_160644530Y7EQLA6Q...Form - I (As Per New Notification of Mo.E.F dated 1-12-2009 vide SO 3067 (E)) ... As per

ANNEXURE – 2

PROJECT PROPONENT : Shanta Sriram Construction Pvt. Ltd

PROJECT NAME : Shanta Sriram – Tech Park

LOCATION : Gachibowli Village, Serilingampally

Mandal, Ranga Reddy District, Telangana

SUBJECT : Facilities of the project

COMMERCIAL COMPLEX SHANTA SRIRAM – TECH PARK

A. FACILITIES OF THE PROJECT

S.No Description Height of the Building (m)

1. IT Office 30

B. LAND USE BREAK-UP

S.No Description Area (Sq.m) Area (Acres) Percentage (%)

1. Ground coverage 3499.92 0.86 41.69

2. Internal road 3768.09 0.94 44.87

3. Open Space Reserves (OSR)

813.00 0.20 9.68

4. Area left for road widening

314.93 0.07 3.76

5. Total 8395.94 2.07 100.00

C. BUILT-UP AREA

S.No Description Block A & B (Sq.m)

1. Basement – 1 6200.00

2. Basement – 2 6270.00

3. Basement – 3 6340.00

4. Ground Floor 3679.58

5. First Floor 3828.98

6. Second Floor 4341.57

7. Third Floor 4341.57

8. Fourth Floor 4341.57

9. Fifth Floor 4341.57

10. Sixth Floor 4341.57

11. Seventh Floor 4341.57

Total 52367.98

D. PARKING DETAILS

BLOCK „A‟ & „B‟ S.No Description Two Wheeler Four Wheeler

1. Basement – 1 65 120

2. Basement – 2 80 110

3. Basement – 3 80 115

Total 225 570

Page 22: FORM Ienvironmentclearance.nic.in/writereaddata/Online/TOR/21_Feb_2018_160644530Y7EQLA6Q...Form - I (As Per New Notification of Mo.E.F dated 1-12-2009 vide SO 3067 (E)) ... As per

LOCATION MAP

INDIA

Wa ra n ga l

TELANGANA

Na lgon da

Kh a m m a m

Adila ba d

Ka rim n a ga rNiza m ba d

Me da k

Ra n ga re dd i

Ma h a bu bn a ga r

LEGEND

RAILWAY TRACK

RIVER

ROAD

DIS TRICT BOUNDARY

S TATE HIGHWAY

TALUK HEADQUARTER

DIS TRICT HEADQUARTER

TOWN

S TREAMS

NATIONAL HIGHWAY

PROJECT S ITERANGA REDDY DISTRICT

Ve n ka ta pu ra m

Ma ilwa rra m

Mirya n

Tandur

S h a h a ba dPargi

Ma rka lNa n ch e rla

Mu h a m m a da ba d

Dom a

Mora n gpa lli

Pe dda m a l

Ela l

Kote pa lli

Pa t lu r

Ma rpa lli

Ch a n gom a l

Chevella

S h a n ka rpa lli

Vikarabad

Ibrahimpatanam

Ya ch a ra m

Ma is a ra m

Bola ra mMa u la Ali

Medchal

HYDERABAD

Tu kku gu da

S e cu n de ra ba dGu n d ipe t

Golkon da

7

7

9

7& 9

Hu s a inS a ga r

PROJECT SITE

ANNEXURE - 3

N

Note : - Not to s ca le

Page 23: FORM Ienvironmentclearance.nic.in/writereaddata/Online/TOR/21_Feb_2018_160644530Y7EQLA6Q...Form - I (As Per New Notification of Mo.E.F dated 1-12-2009 vide SO 3067 (E)) ... As per

N

Kazipet Jn.134.5 km

To

25.7 km

To

Sangareddi

Hyderabad8.7 km

To

Wadi153.0 km

To

Bolarum9.1 km

To

PROJECT SITE PREPARED BY

S ECUNDERABAD

SHOWING 10 km RADIUS

TOPOGRAPHICAL MAP

AN

NE

XU

RE

- 3A

M/s. SHANTA SRIRAM CONSTRUCTIONS PVT. LTD., CLIENT :

TITLE :

Ga ch ibowli Villa ge , S e rilin ga m pa lly Ma n da l, Ra n ga Re ddy Dis t r ict , Te la n ga n a .

PROJECT :

PROJECT S ITE

S CALE

3

S u rve y of In d ia Topos h e e t s

5 67

K

5 66

K

5 68

K

5 63

K

5 62

K

5 64

K

5 61 0

K

5 61 1

K

5 61 2

K

In de x to

0 6 km

REFER TO THIS MAP AS : - 1 : 5 0 ,0 0 0

Pu b lis h e d u n de r th e d ire ct ion of

S HEET 5 6 K / 7 FIRS T EDITION

th e S u rve yor Ge n e ra l of In d ia - 2 0 1 2

LEGEND

Page 24: FORM Ienvironmentclearance.nic.in/writereaddata/Online/TOR/21_Feb_2018_160644530Y7EQLA6Q...Form - I (As Per New Notification of Mo.E.F dated 1-12-2009 vide SO 3067 (E)) ... As per

PROJECT SITE

GOOGLE EARTH IMAGERY FOR THE PROJECT SITEA

NN

EX

UR

E - 3

B

Page 25: FORM Ienvironmentclearance.nic.in/writereaddata/Online/TOR/21_Feb_2018_160644530Y7EQLA6Q...Form - I (As Per New Notification of Mo.E.F dated 1-12-2009 vide SO 3067 (E)) ... As per
Page 26: FORM Ienvironmentclearance.nic.in/writereaddata/Online/TOR/21_Feb_2018_160644530Y7EQLA6Q...Form - I (As Per New Notification of Mo.E.F dated 1-12-2009 vide SO 3067 (E)) ... As per
Page 27: FORM Ienvironmentclearance.nic.in/writereaddata/Online/TOR/21_Feb_2018_160644530Y7EQLA6Q...Form - I (As Per New Notification of Mo.E.F dated 1-12-2009 vide SO 3067 (E)) ... As per

ANNEXURE – 3D

PHOTOGRAPHS SHOWING THE PROJECT

Page 28: FORM Ienvironmentclearance.nic.in/writereaddata/Online/TOR/21_Feb_2018_160644530Y7EQLA6Q...Form - I (As Per New Notification of Mo.E.F dated 1-12-2009 vide SO 3067 (E)) ... As per
Page 29: FORM Ienvironmentclearance.nic.in/writereaddata/Online/TOR/21_Feb_2018_160644530Y7EQLA6Q...Form - I (As Per New Notification of Mo.E.F dated 1-12-2009 vide SO 3067 (E)) ... As per
Page 30: FORM Ienvironmentclearance.nic.in/writereaddata/Online/TOR/21_Feb_2018_160644530Y7EQLA6Q...Form - I (As Per New Notification of Mo.E.F dated 1-12-2009 vide SO 3067 (E)) ... As per
Page 31: FORM Ienvironmentclearance.nic.in/writereaddata/Online/TOR/21_Feb_2018_160644530Y7EQLA6Q...Form - I (As Per New Notification of Mo.E.F dated 1-12-2009 vide SO 3067 (E)) ... As per
Page 32: FORM Ienvironmentclearance.nic.in/writereaddata/Online/TOR/21_Feb_2018_160644530Y7EQLA6Q...Form - I (As Per New Notification of Mo.E.F dated 1-12-2009 vide SO 3067 (E)) ... As per

PROPOSED EXISTING

DISMENTLE SCALE 1: 100 M

REFERENCESREFERENCES

BUILDERS SIGNATUREENGINEER SIGNATUREARCHITECT SIGNATURE

D.G.P.A. HOLDER SIGNATURE

AREA DETAILS :

LOCATION PLANNOT TO SCALE

DUCT

PROPOSED

BUILDING

PROPOSED

BUILDING

DUCT

19.36 Smt

30' WIDE ROAD30' WIDE ROAD

130.00 smt

30

' W

IDE

RO

AD

180.00 smt

30' WIDE ROAD

OSR

53.00 smt

SIDE OPEN SPACE

SIDE OPEN SPACE

SIDE OPEN SPACESIDE OPEN SPACE

RE

AR

O

PE

N S

PA

CE

FR

ON

T O

PE

N S

PA

CE

EF

F.

UN

DE

R R

OA

D W

IDE

NIN

G A

RE

A :

31

4.9

3 S

mt

450.00 smt

15.00 [49'-2 1/2"]

14.00 [45'-11"]

8.0411.81

5.6

8

17.23

8.00

8.0

0

8.7

3

8.0

7

11.8

0

3.71

19.44

25.0

8 [

82'-

3 1

/2"]

26.92 [88'-4"]13.23 [43'-5"]

7.51 [24'-7 1/2"]23.35 [76'-7 1/2"]

17.13 [56'-2"]

3.46

14.00 [45'-11"]

19.11 [62'-8 1/2"]

7.48 [24'-6 1/2"]

64.5830.33

8.2

7

27.44

16.65

7.91

15.21

16.49

8.7

5

9.1

1

8.0

4

8.4

7

0.9

0

23.36

2.3

1

31.0

9

10.00

1.9

0

11.17

2.4

5

10.771.56 11.24

1.3

8 5.15

0.5

5

5.74

0.9

8

10.46

0.4

6 5.59

1.3

0 4.65

8.1

25.6

9

9.10

9.69

8.2

0

8.0

0

11.23 [36'-10"]

11.61 [38'-1"]

11.48 [37'-8"]

5.55 [18'-2 1/2"]

4.44 [14'-7"]16.41 [53'-10"]

4.8

5 [1

5'-1

1"]

4.3

7 [

14'-

4"]

2.1

1

13.45 [44'-1 1/2"]

14.6

2 [

47'-

11 1

/2"]

7.6

0 [

24'-

11"]

43.44 [142'-6 1/2"]

25.54 [83'-9 1/2"]

8.06 [26'-5"] 5.64 [18'-6"] 4.62 [15'-2"]10.01 [32'-10"]

7.91 [25'-11 1/2"]7.86 [25'-9 1/2"]

8.07 [26'-5 1/2"]7.78 [25'-6 1/2"] 7.82 [25'-8"]

7.75 [25'-5"]7.83 [25'-8 1/2"]

8.43 [27'-8"]

9.02 [29'-7"]7.04 [23'-1"]

9.08 [29'-9 1/2"]7.63 [25'-0 1/2"]

7.48 [24'-6 1/2"]6.62 [21'-8 1/2"]2.347.50 [24'-7"]2.782.742.730.73

7.63 [25'-0 1/2"]7.77 [25'-5 1/2"]7.80 [25'-7"]4.78 [15'-8"]3.047.83 [25'-8 1/2"]

7.67 [25'-2"]7.84 [25'-8 1/2"]2.945.68 [18'-7 1/2"]8.46 [27'-9"]10.05 [32'-11 1/2"]10.50 [34'-5 1/2"]

11.04 [36'-2 1/2"]

0.7

5

6.68 0.90

6.89

8.0

0

8.00

8.0

3

2.533.20

4.88

1.98 [6'-6"]

1.9

0

12.10

SITE PLAN

PLAN OF EXISTING OFFICE BUILDING SHANTA SRIRAM - TECH PARK

IN SURVEY NO : 126,

SITUATED AT GACHIBOWLI VILLAGE,

SERILINGAMPALLY MANDAL,

RANGA REDDY (DIST)., TELANGANA.

NORTH

9.70

GACHIBOWLI

STADIUM

TO SHAMSHABAD EXPRESS

WAY ROAD

GACHIBOWLI 'X' ROADS

TO ISB & MICRO SOFT ROAD

BO

TA

NIC

AL

GA

RD

EN

DL

F C

YB

ER

CIT

Y

ROAD

IIIT

CA

MP

US

TO

H

YD

ER

AB

AD

C

EN

TR

AL

UN

IVE

RS

ITY

TCS SYNERGY PARK

OP

EN

PL

OT

SITE

ROAD

TO KONDAPUR ROAD

RO

AD

TO

TO

LIC

HO

WK

I

OPEN PLOT

OSR

OSR

OSR

S.No Description Area (Sq.m) Area (Acres) Percentage (%)1. Ground coverage 3499.92 0.86 41.69

2. Internal road 3768.09 0.94 44.87

3. Open Space Reserves (OSR)

813.00 0.20 9.68

4. Area left for road widening

314.93 0.07 3.76

5. Total 8395.94 2.07 100.00

S.No Description Block A & B (Sq.m)

1. Basement 1 6200.00

2. Basement 2 6270.00

3. Basement 3 6340.00

4. Ground Floor 3679.58

5. First Floor 3828.98

6. Second Floor 4341.57

7. Third Floor 4341.57

8. Fourth Floor 4341.57

9. Fifth Floor 4341.57

10. Sixth Floor 4341.57

11. Seventh Floor 4341.57

Total 52367.98

BLOCK 'A' & 'B'

S.No Description Two Wheeler Four Wheeler

1. Basement 1 65 120

2. Basement 2 80 110

3. Basement 3 80 115

Total 225 570

PARKING DETAILS

BUILT-UP AREA

LAND USE BREAK-UP

PROJECT DEVELOPER

SHANTA SRIRAM CONSTRUCTIONS PVT. LTD

501, Oasis Centre, Somajiguda,

Begumpet Main Road, Opp. Pullareddy Sweets,

PLAN OF SHANTA SRIRAM - TECH PARK, GACHIBOWLI VILLAGE, SERILINGAMPALLY MANDAL, RANGA REDDY DISTRICT, TELANGANA.

SCALE:-1:200

AN

NE

XU

RE

- 5

Page 33: FORM Ienvironmentclearance.nic.in/writereaddata/Online/TOR/21_Feb_2018_160644530Y7EQLA6Q...Form - I (As Per New Notification of Mo.E.F dated 1-12-2009 vide SO 3067 (E)) ... As per

ANNEXURE – 6

PROJECT PROPONENT : Shanta Sriram Construction Pvt. Ltd

PROJECT NAME : Shanta Sriram – Tech Park

LOCATION : Gachibowli Village, Serilingampally

Mandal, Ranga Reddy District, Telangana

SUBJECT : Solid waste generation calculation

CALCULATION:

COMMERCIAL COMPLEX

S. No. Description Number of units Number of persons/unit

Total number of persons

1. Block A 1 2606 2606

2. Block B 1 1116 1116

Total persons 3722

3. Based on solid waste generation rates in the urban areas, it is estimated per person

0.2 kg

4. Total persons 3722

5. Total waste generation in kg 744

6. Organic waste in kg (55%) 409

7. In-organic waste in kg (45%) 335

S.No. Waste Disposal Details

1. Organic waste Organic wastes will be disposed to local municipal authorities

2. Inorganic waste Inorganic wastes will be disposed to authorize vendors for recycling

Page 34: FORM Ienvironmentclearance.nic.in/writereaddata/Online/TOR/21_Feb_2018_160644530Y7EQLA6Q...Form - I (As Per New Notification of Mo.E.F dated 1-12-2009 vide SO 3067 (E)) ... As per

ANNEXURE – 7

PROJECT PROPONENT : Shanta Sriram Construction Pvt. Ltd

PROJECT NAME : Shanta Sriram – Tech Park

LOCATION : Gachibowli Village, Serilingampally

Mandal, Ranga Reddy District, Telangana

SUBJECT : Water and wastewater balance

A. SOURCE OF WATER : Hyderabad Metropolitan Water Supply &

Sewerage Board (HMWS&SB)/Water tankers B. WATER REQUIREMENT

S.No Description Total no of persons

Drinking (lpd)

Flushing (lpd)

Drinking (klpd)

Flushing (klpd)

Total (klpd)

1. Block – A 2606 5 45 13.03 117.27 130.30

2. Block – B 1116 5 45 5.58 50.22 55.80

3. Visitors (10% Block – A & B)

373 5 45 1.87 16.79 18.66

Sub Total 4095 - - 20.48 184.28 204.76

Total water requirement 205 klpd (Approx.)

WASTEWATER GENERATION

S.No Item Details

1. Total water requirement klpd 205

2. Wastewater generation (75% Domestic and Flushing) (0.75*205 =153.75)

klpd 154

3. Design STP Capacity klpd 175

4. Treated wastewater (75% wastewater generation) (0.75*154 = 115)

klpd 115

TREATED WASTEWATER USAGE

The treated wastewater will be disposed to the existing sewer line.

FRESH WATER REQUIREMENT

The fresh water requirement is estimated at 205 klpd

Note: klpd – kilo litres per day lpd – litres per day

Page 35: FORM Ienvironmentclearance.nic.in/writereaddata/Online/TOR/21_Feb_2018_160644530Y7EQLA6Q...Form - I (As Per New Notification of Mo.E.F dated 1-12-2009 vide SO 3067 (E)) ... As per

ANNEXURE – 8

PROJECT PROPONENT : Shanta Sriram Construction Pvt. Ltd

PROJECT NAME : Shanta Sriram – Tech Park

LOCATION : Gachibowli Village, Serilingampally

Mandal, Ranga Reddy District, Telangana

SUBJECT : Power Requirement

S.No Item Details

1. Source of electricity Telangana Southern Power Distribution Company Limited (TSSPDCL)

2. TSSPDCL kVA Construction phase Operation phase

- 3400

3. DG sets for power backup

kVA - 2500

4. Fuel requirement Litres per hour

- 444.77

5. DG sets Number - 2x1250

Page 36: FORM Ienvironmentclearance.nic.in/writereaddata/Online/TOR/21_Feb_2018_160644530Y7EQLA6Q...Form - I (As Per New Notification of Mo.E.F dated 1-12-2009 vide SO 3067 (E)) ... As per

FORM – IA

For

“SHANTA SRIRAM – TECH PARK” (Commercial complex)

At Gachibowli Village, Serilingampally Mandal,

Ranga Reddy District, Telangana

MAY – 2017

PROJECT PROPONENT ENVIRONMENT CONSULTANT

SHANTA SRIRAM CONSTRUCTIONS PVT. LTD., Hyderabad, Telangana.

B.S. ENVI-TECH PVT. LTD., Secunderabad, Telangana. NABET Accreditation: NABET/EIA/1316/RA002

Page 37: FORM Ienvironmentclearance.nic.in/writereaddata/Online/TOR/21_Feb_2018_160644530Y7EQLA6Q...Form - I (As Per New Notification of Mo.E.F dated 1-12-2009 vide SO 3067 (E)) ... As per

2

APPENDIX II

(See paragraph 6)

FORM-1 A

(Only for construction projects listed under item 8 of the Schedule) CHECK LIST OF ENVIRONMENTAL IMPACTS (Project proponents are required to provide full information and wherever necessary attach explanatory notes with the Form and submit along with proposed environmental management plan & monitoring programme)

1. LAND ENVIRONMENT

1.0 (Attach panoramic view of the

project site and the vicinity)

Site photographs are enclosed in

Annexure - A1

1.1. Will the existing landuse get

significantly altered from the project

that is not consistent with the

surroundings? (Proposed landuse

must conform to the approved

Master Plan / Development Plan of

the area. Change of landuse if any

and the statutory approval from the

competent authority are submitted).

Background

SSCPL constructed a commercial

complex titled “Shanta Sriram - Tech Park” to accommodated on a plot area of 2.07 Acres.

It is a violation case. A court case

was filed by Telangana Pollution

Control Board in the year 2016.

The judgement was declared on

31.08.2016 with a penalty.

The project did not obtain

Environmental Clearance from

SEIAA, Telangana. However it had

constructed the commercial

complex in the year 2016.

The details are furnished in

Annexure – A2.

Page 38: FORM Ienvironmentclearance.nic.in/writereaddata/Online/TOR/21_Feb_2018_160644530Y7EQLA6Q...Form - I (As Per New Notification of Mo.E.F dated 1-12-2009 vide SO 3067 (E)) ... As per

3

Attach Maps of

(i) Site location,

(ii) Surrounding features of

the proposed site (within

500 meters) and

(iii) The site (indicating levels &

contours) to appropriate

scales.

If not available attach only

conceptual plans.

Plot Area : 8395.94 Sq.m

Built-up Area : 52367.98 Sq.m

Building Height : 30 m

IT office and Services

Block A and Block B with (Three

Basements + Ground Floor –

Seven Floors)

Parking details

Parking Area : 18810.00 Sq.m

Two Wheeler : 225 Nos.

Four Wheeler : 570 Nos.

The various facilities of the

Commercial complex are given in

Annexure – A3.

As per GHMC master plan, the

survey numbers are designated

for commercial use. The copy of

the letter from GHMC is given in

Annexure – A4.

The Master plan of project is given

in Annexure – A5.

Maps for the project site

Annexures

Location Map Annexure A6

10km radius map

Annexure A7

500m Key map Annexure A8

Google Earth Imagery

Annexure A9

1.2. List out all the major project

requirements in terms of the land

area, built up area, water

consumption, power requirement,

connectivity, community facilities,

The salient features of the

completed project are given in

Annexure – A10.

Page 39: FORM Ienvironmentclearance.nic.in/writereaddata/Online/TOR/21_Feb_2018_160644530Y7EQLA6Q...Form - I (As Per New Notification of Mo.E.F dated 1-12-2009 vide SO 3067 (E)) ... As per

4

parking needs etc.

1.3. What are the likely impacts of the

proposed activity on the existing

facilities adjacent to the proposed

site? (Such as open spaces,

community facilities, details of the

existing landuse, disturbance to the

local ecology).

The site and surrounding areas

are earmarked as commercial

development as per the master

plan of GHMC

1.4. Will there be any significant land

disturbance resulting in erosion,

subsidence & instability?

(Details of soil type, slope analysis,

vulnerability to subsidence,

seismicity etc may be given).

Not Applicable.

1.5. Will the proposal involve alteration

of natural drainage systems? (Give

details on a contour map showing

the natural drainage near the

proposed project site)

A proper storm water

management has been

implemented.

1.6. What are the quantities of

earthwork involved in the

construction activity-cutting, filling,

reclamation etc. (Give details of the

quantities of earthwork involved,

transport of fill materials from

outside the site etc)

Not Applicable.

1.7. Give details regarding water supply,

waste handling etc during the

construction period.

Not Applicable.

1.8. Will the low-lying areas & wetlands

get altered? (Provide details of how

low lying and wetlands are getting

modified from the proposed activity)

None.

1.9. Whether construction debris &

waste during construction cause

health hazard? (Give quantities of

various types of wastes generated

during construction including the

construction labour and the means

of disposal)

Not Applicable.

Page 40: FORM Ienvironmentclearance.nic.in/writereaddata/Online/TOR/21_Feb_2018_160644530Y7EQLA6Q...Form - I (As Per New Notification of Mo.E.F dated 1-12-2009 vide SO 3067 (E)) ... As per

5

2. WATER ENVIRONMENT

2.1. Give the total quantity of water

requirement for the proposed

project with the breakup of

requirements for various uses. How

will the water requirement met?

State the sources & quantities and

furnish a water balance statement.

Total water requirement of the

project is estimated as 205 klpd.

Details of the water and

wastewater balance are given in

Annexure – A11.

2.2. What is the capacity (dependable

flow or yield) of the proposed source

of water?

The source of water will be through

HMWS&SB/Private tankers.

2.3. What is the quality of water

required, in case, the supply is not

from a municipal source? (Provide

physical, chemical, biological

characteristics with class of water

quality)

Not Applicable.

2.4. How much of the water

requirement can be met from the

recycling of treated wastewater?

(Give the details of quantities,

sources and usage)

A STP of 175 kld capacity is

provided. Treated wastewater of

115 klpd is disposed to existing

sewer line

Please refer Annexure – A11.

2.5. Will there be diversion of water

from other users? (Please assess

the impacts of the project on other

existing uses and quantities of

consumption)

No

2.6. What is the incremental pollution

load from wastewater generated

from the proposed activity? (Give

details of the quantities and

composition of wastewater

generated from the proposed

activity)

The wastewater generated will be

treated in a Sewage Treatment

Plant (STP) within project premises

and will be disposed to the existing

sewer line

2.7. Give details of the water

requirements met from water

harvesting? Furnish details of the

facilities created.

The roof rain water will be

collected from the terrace of the

building and discharge to the

existing storm water drain.

Page 41: FORM Ienvironmentclearance.nic.in/writereaddata/Online/TOR/21_Feb_2018_160644530Y7EQLA6Q...Form - I (As Per New Notification of Mo.E.F dated 1-12-2009 vide SO 3067 (E)) ... As per

6

2.8. What would be the impact of the

land use changes occurring due to

the proposed project on the runoff

characteristics (quantitative as well

as qualitative) of the area in the

post construction phase on a long-

term basis? Would it aggravate the

problems of flooding or water

logging in any way?

A well design storm water

management has been

constructed.

2.9. What are the impacts of the

proposal on the ground water? (Will

there be tapping of ground water;

give the details of ground water

table, recharging capacity, and

approvals obtained from competent

authority, if any)

Nil.

2.10. What precautions/measures are

taken to prevent the run-off from

construction activities polluting

land & aquifers? (Give details of

quantities and the measures taken

to avoid the adverse impacts)

Not Applicable, since the

construction is completed.

2.11. How is the storm water from within

the site managed?(State the

provisions made to avoid flooding of

the area, details of the drainage

facilities provided along with a site

layout indication contour levels)

Roof water from the respective

buildings shall be collected

through rain water down take

pipes and disposed to storm water

drain.

2.12. Will the deployment of construction

labourers particularly in the peak

period lead to unsanitary

conditions around the project site

(Justify with proper explanation)

Not Applicable.

2.13. What on-site facilities are provided

for the collection, treatment & safe

disposal of sewage? (Give details of

the quantities of wastewater

generation, treatment capacities

The wastewater generated during

the operation phase will be treated

by 175 kld capacity of STP based

on Sequential Batch Reactor

process.

Page 42: FORM Ienvironmentclearance.nic.in/writereaddata/Online/TOR/21_Feb_2018_160644530Y7EQLA6Q...Form - I (As Per New Notification of Mo.E.F dated 1-12-2009 vide SO 3067 (E)) ... As per

7

with technology & facilities for

recycling and disposal).

2.14. Give details of dual plumbing

system if treated waste is used for

flushing of toilets of toilets or any

other use.

Not Applicable.

3. VEGETATION

3.1. Is there any threat of the project to

the biodiversity? (Give a description

of the local ecosystem with it’s unique features, if any)

No.

3.2. Will the construction involve

extensive clearing or modification of

vegetation? (Provide a detailed

account of the trees & vegetation

affected by the project)

Not Applicable, since the

construction was completed.

3.3.

What are the measures proposed to

be taken to minimize the likely

impacts on important site features

(Give details of proposal for tree

plantation, landscaping, creation of

water bodies etc along with a layout

plan to an appropriate scale)

Not Applicable, since the

construction was completed.

4. FAUNA

4.1. Is there likely to be any

displacement of fauna- both

terrestrial and aquatic or creation of

barriers for their movement? Provide

the details.

No.

4.2. Any direct or indirect impacts on the

avifauna of the area? Provide

details.

Not Applicable.

4.3. Prescribe measures such as

corridors, fish ladders etc to

mitigate adverse impacts on fauna

Not Applicable.

Page 43: FORM Ienvironmentclearance.nic.in/writereaddata/Online/TOR/21_Feb_2018_160644530Y7EQLA6Q...Form - I (As Per New Notification of Mo.E.F dated 1-12-2009 vide SO 3067 (E)) ... As per

8

5. AIR ENVIRONMENT

5.1. Will the project increase

atmospheric concentration of gases

& result in heat islands? (Give

details of background air quality

levels with predicted values based

on dispersion models taking into

account the increased traffic

generation as a result of the

proposed constructions)

Diesel Generator (DG) sets of

2x1250 kVA will be provided for

the emergency standby power. The

DG set operation is to meet

emergency power requirements.

Hence there will be no significant

impact on air quality. Since the

usage of DG sets is for temporary

period only.

5.2. What are the impacts on generation

of dust, smoke, odorous fumes or

other hazardous gases? Give details

in relation to all the meteorological

parameters.

Not applicable. Since the

Commercial complex will have

paved roads. This will minimize

the generation of fugitive dust.

5.3. Will the proposal create shortage of

parking space for vehicles? Furnish

details of the present level of

transport infrastructure and

measures proposed for improvement

including the traffic management at

the entry & exit to the project site.

Sufficient parking slots are

provided

Commercial complex

NO.OF SLOTS

Cars 570

2 Wheelers 225

Parking Area : 18810.00 Sq.m

5.4. Provide details of the movement

patterns with internal roads, bicycle

tracks, pedestrian pathways,

footpaths etc., with areas under

each category.

The project will have internal

roads of 8m width to ensure free

flow of traffic.

5.5. Will there be significant increase in

traffic noise & vibrations? Give

details of the sources and the

measures proposed for mitigation of

the above.

Not Applicable.

5.6. What will be the impact of DG sets

& other equipment on noise levels &

vibration in & ambient air quality

around the project site? Provide

details.

DG (Diesel Generator) set will be

used as backup power option.

They will comply with Central

Pollution Control Board (CPCB)

guidelines for emission & noise

control.

Page 44: FORM Ienvironmentclearance.nic.in/writereaddata/Online/TOR/21_Feb_2018_160644530Y7EQLA6Q...Form - I (As Per New Notification of Mo.E.F dated 1-12-2009 vide SO 3067 (E)) ... As per

9

6. AESTHETICS

6.1. Will the proposed constructions in

any way result in the obstruction

of a view, scenic amenity or

landscapes? Are these

considerations taken into account

by the proponents?

No provision for greenbelt

development has been made.

6.2. Will there be any adverse impacts

from new constructions on the

existing structures? What are the

considerations taken into

account?

No.

6.3. Whether there are any local

considerations of urban form &

urban design influencing the

design criteria? They may be

explicitly spelt out.

No.

6.4. Are there any anthropological or

archaeological sites or artifacts

nearby? State if any other

significant features in the vicinity

of the proposed site have been

considered.

Golconda Fort is at a distance of

8.50 km – SSE

7. SOCIO-ECONOMIC ASPECTS

7.1. Will the proposal result in any

changes to the demographic

structure of local population?

Provide the details.

No.

7.2. Give details of the existing social

infrastructure around the

proposed project.

The area is having a number of IT

parks, Engineering colleges and

other commercial apartment

complexes in the vicinity.

7.3. Will the project cause adverse

effects on local communities,

disturbance to sacred sites or

other cultural values? What are

the safeguards proposed?

No.

Page 45: FORM Ienvironmentclearance.nic.in/writereaddata/Online/TOR/21_Feb_2018_160644530Y7EQLA6Q...Form - I (As Per New Notification of Mo.E.F dated 1-12-2009 vide SO 3067 (E)) ... As per

10

8. BUILDING MATERIALS

8.1. May involve the use of building

materials with high-embodied

energy. Are the construction

materials produced with energy

efficient processes? (Give details of

energy conservation measures in

the selection of building materials

and their energy efficiency)

Common area lighting are

provided to work on high energy

efficient lamps (CFL) which results

in saving general consumption.

8.2. Transport and handling of

materials during construction

may result in pollution, noise &

public nuisance. What measures

are taken to minimize the

impacts?

Not Applicable. Construction of

commercial complex was already

completed.

8.3. Are recycled materials used in

roads and structures? State the

extent of savings achieved?

Not Applicable.

8.4. Give details of the methods of

collection, segregation & disposal

of the garbage generated during

the operation phases of the

project.

The solid wastes generated during

operation phase will consist of

mainly paper, cartons, thermocol,

plastics, polythene bags, glass,

waste vegetables and foods etc,.

The inorganic wastes will be

disposed to authorize vendors for

recycling and the organic wastes

will be disposed to local municipal

authorities.

9. ENERGY CONSERVATION

9.1 Give details of the power

requirements, source of supply,

backup source etc. What is the

energy consumption assumed per

square foot of built-up area? How

have you tried to minimize energy

consumption?

Power requirement: The estimated

power requirement is 3400 kVA

The details of power requirement are

furnished in the Annexure – A12.

9.2 What type of, and capacity of,

power back-up to you plan to

The emergency power supply is

through DG Sets.

Page 46: FORM Ienvironmentclearance.nic.in/writereaddata/Online/TOR/21_Feb_2018_160644530Y7EQLA6Q...Form - I (As Per New Notification of Mo.E.F dated 1-12-2009 vide SO 3067 (E)) ... As per

11

provide? Please refer Annexure – A12.

9.3 What are the characteristics of

the glass you plan to use?

Provide specifications of its

characteristics related to both

short wave and long wave

radiation?

Not Applicable.

9.4 What passive solar architectural

features are being used in the

building? Illustrate the

applications made in the

proposed project.

Not Applicable.

9.5 Does the layout of streets &

buildings maximize the potential

for solar energy devices? Have

you considered the use of street

lighting, emergency lighting and

solar hot water systems for use in

the building complex?

Not Applicable.

9.6 Is shading effectively used to

reduce cooling/heating loads?

What principles have been used

to maximize the shading of Walls

on the East and the West and the

Roof? How much energy saving

has been effected?

Not Applicable.

9.7 Do the structures use energy-

efficient space conditioning,

lighting and mechanical systems?

Provide technical details. Provide

details of the transformers and

motor efficiencies, lighting

intensity and air-conditioning

load assumptions? Are you using

CFC and HCFC free chillers?

Provide specifications.

The energy savings will be done by

providing common lighting, CFL and

Lifts.

9.8 What are the likely effects of the

building activity in altering the

micro-climates? Provide a self-

assessment on the likely impacts

No.

Page 47: FORM Ienvironmentclearance.nic.in/writereaddata/Online/TOR/21_Feb_2018_160644530Y7EQLA6Q...Form - I (As Per New Notification of Mo.E.F dated 1-12-2009 vide SO 3067 (E)) ... As per

12

of the proposed construction on

creation of heat island &

inversion effects?

9.9 What are the thermal

characteristics of the building

envelope? (a) roof; (b) external

walls; and (c) fenestration? Give

details of the material used and

the U-values or the R-values of

the individual components.

Not Applicable.

9.10 What precautions & safety

measures are proposed against

fire hazards? Furnish details of

emergency plans.

Fire Extinguishers

Hose reel system

Wet riser

Automatic detection system

Automatic Sprinkler system

Yard Hydrant system

Manual Call point

(Fire Alarm systems)

Underground static water tank

Terrace tank

The project received NOC from Fire

Department.

9.11 If you are using glass as wall

material, provide details and

specifications including

emissivity and thermal

characteristics.

Not Applicable.

9.12 What is the rate of air infiltration

into the building? Provide details

of how you are mitigating the

effects of infiltration.

The rate of air filtration into the building is 5% as it is not 100% air tight building.

9.13 To what extent the non-

conventional energy technologies

are utilised in the overall energy

consumption? Provide details of

the renewable energy

technologies used.

Nil.

Page 48: FORM Ienvironmentclearance.nic.in/writereaddata/Online/TOR/21_Feb_2018_160644530Y7EQLA6Q...Form - I (As Per New Notification of Mo.E.F dated 1-12-2009 vide SO 3067 (E)) ... As per

PROJECT PROPONENT : Shanta Sriram Construction Pvt. Ltd

PROJECT NAME : Shanta Sriram – Tech Park

LOCATION : Gachibowli Village, Serilingampally

Mandal, Ranga Reddy District, Telangana

SUBJECT : Form 1A

LIST OF ANNEXURES

S. No. ANNEXURES DESCRIPTION

1. Annexure – A1 Photographs of the site

2. Annexure – A2 Chronology of the project

3. Annexure – A3 Various facilities of the Tech Park

4. Annexure – A4 Copy of GHMC letter

5. Annexure – A5 Master plan of the project

6. Annexure – A6 Location Map

7. Annexure – A7 10 km Radius Map (Toposheet)

8. Annexure – A8 500 m Radius Map (Google Map)

9. Annexure – A9 Google Earth Imagery

10. Annexure – A10 Salient feature of the project

11. Annexure – A11 Water and wastewater balance

12. Annexure – A12 Power requirement

Page 49: FORM Ienvironmentclearance.nic.in/writereaddata/Online/TOR/21_Feb_2018_160644530Y7EQLA6Q...Form - I (As Per New Notification of Mo.E.F dated 1-12-2009 vide SO 3067 (E)) ... As per

ANNEXURE – A1

PHOTOGRAPHS SHOWING THE PROJECT

Page 50: FORM Ienvironmentclearance.nic.in/writereaddata/Online/TOR/21_Feb_2018_160644530Y7EQLA6Q...Form - I (As Per New Notification of Mo.E.F dated 1-12-2009 vide SO 3067 (E)) ... As per

ANNEXURE – A2

PROJECT PROPONENT : Shanta Sriram Construction Pvt. Ltd

PROJECT NAME : Shanta Sriram – Tech Park

LOCATION : Gachibowli Village, Serilingampally

Mandal, Ranga Reddy District, Telangana

SUBJECT : Chronology of the project

COMMERCIAL COMPLEX SHANTA SRIRAM – TECH PARK

S.No. Description Status

1. Date of Land Acquisition 2005

2. Date of Application to GHMC for plan

approval (Old)

2008

3. Date of Application to GHMC for plan

approval (Revised)

2013

4. Permit No. (Old - 2008) G/104/BP/WZ/447/08

5. Date of GHMC plan Approval (Old

2008)

23.09.2008

6. Application No. (Revised 2013) 62846/24/07/2013/HO

7. Permit No. (Revised 2013) 40076/HO/WZ/Cir-11/2015

8. Date of GHMC plan Approval 13.03.2015

9. Date of start of construction 2005

10. Date of completion of construction 2016

11. Application to SEIAA, AP 27.07.2013

12. Letter vide No. SEIAA/AP/RRD-2013-3786

13. SEIAA, Andhra Pradesh letter dated 25.09.2013

14. Court case filed by Department of

Environment

May 2016

15. Name of the court IV AJCJ – CUM – XXV

Metropolitan Magistrate,

Cyberabad, Kukatpally,

Miyapur

16. Court Case No. 1082/2016

17. Status of the court case Court case was cleared on

31.08.2016

18. Court order Penalty of Rs. 30,000/- was

paid by the project proponent

Page 51: FORM Ienvironmentclearance.nic.in/writereaddata/Online/TOR/21_Feb_2018_160644530Y7EQLA6Q...Form - I (As Per New Notification of Mo.E.F dated 1-12-2009 vide SO 3067 (E)) ... As per

ANNEXURE – A3

PROJECT PROPONENT : Shanta Sriram Construction Pvt. Ltd

PROJECT NAME : Shanta Sriram – Tech Park

LOCATION : Gachibowli Village, Serilingampally

Mandal, Ranga Reddy District, Telangana

SUBJECT : Facilities of the project

COMMERCIAL COMPLEX SHANTA SRIRAM – TECH PARK

A. FACILITIES OF THE PROJECT

S.No Description Height of the Building (m)

1. IT Office 30

B. LAND USE BREAK-UP

S.No Description Area (Sq.m) Area (Acres) Percentage (%)

1. Ground coverage 3499.92 0.86 41.69

2. Internal road 3768.09 0.94 44.87

3. Open Space Reserves (OSR)

813.00 0.20 9.68

4. Area left for road widening

314.93 0.07 3.76

5. Total 8395.94 2.07 100.00

C. BUILT-UP AREA

S.No Description Block A & B (Sq.m)

1. Basement – 1 6200.00

2. Basement – 2 6270.00

3. Basement – 3 6340.00

4. Ground Floor 3679.58

5. First Floor 3828.98

6. Second Floor 4341.57

7. Third Floor 4341.57

8. Fourth Floor 4341.57

9. Fifth Floor 4341.57

10. Sixth Floor 4341.57

11. Seventh Floor 4341.57

Total 52367.98

D. PARKING DETAILS

BLOCK „A‟ & „B‟ S.No Description Two Wheeler Four Wheeler

1. Basement – 1 65 120

2. Basement – 2 80 110

3. Basement – 3 80 115

Total 225 570

Page 52: FORM Ienvironmentclearance.nic.in/writereaddata/Online/TOR/21_Feb_2018_160644530Y7EQLA6Q...Form - I (As Per New Notification of Mo.E.F dated 1-12-2009 vide SO 3067 (E)) ... As per
Page 53: FORM Ienvironmentclearance.nic.in/writereaddata/Online/TOR/21_Feb_2018_160644530Y7EQLA6Q...Form - I (As Per New Notification of Mo.E.F dated 1-12-2009 vide SO 3067 (E)) ... As per
Page 54: FORM Ienvironmentclearance.nic.in/writereaddata/Online/TOR/21_Feb_2018_160644530Y7EQLA6Q...Form - I (As Per New Notification of Mo.E.F dated 1-12-2009 vide SO 3067 (E)) ... As per

PROPOSED EXISTING

DISMENTLE SCALE 1: 100 M

REFERENCESREFERENCES

BUILDERS SIGNATUREENGINEER SIGNATUREARCHITECT SIGNATURE

D.G.P.A. HOLDER SIGNATURE

AREA DETAILS :

LOCATION PLANNOT TO SCALE

DUCT

PROPOSED

BUILDING

PROPOSED

BUILDING

DUCT

19.36 Smt

30' WIDE ROAD30' WIDE ROAD

130.00 smt

30

' W

IDE

RO

AD

180.00 smt

30' WIDE ROAD

OSR

53.00 smt

SIDE OPEN SPACE

SIDE OPEN SPACE

SIDE OPEN SPACESIDE OPEN SPACE

RE

AR

O

PE

N S

PA

CE

FR

ON

T O

PE

N S

PA

CE

EF

F.

UN

DE

R R

OA

D W

IDE

NIN

G A

RE

A :

31

4.9

3 S

mt

450.00 smt

15.00 [49'-2 1/2"]

14.00 [45'-11"]

8.0411.81

5.6

8

17.23

8.00

8.0

0

8.7

3

8.0

7

11.8

0

3.71

19.44

25.0

8 [

82'-

3 1

/2"]

26.92 [88'-4"]13.23 [43'-5"]

7.51 [24'-7 1/2"]23.35 [76'-7 1/2"]

17.13 [56'-2"]

3.46

14.00 [45'-11"]

19.11 [62'-8 1/2"]

7.48 [24'-6 1/2"]

64.5830.33

8.2

7

27.44

16.65

7.91

15.21

16.49

8.7

5

9.1

1

8.0

4

8.4

7

0.9

0

23.36

2.3

1

31.0

9

10.00

1.9

0

11.17

2.4

5

10.771.56 11.24

1.3

8 5.15

0.5

5

5.74

0.9

8

10.46

0.4

6 5.59

1.3

0 4.65

8.1

25.6

9

9.10

9.69

8.2

0

8.0

0

11.23 [36'-10"]

11.61 [38'-1"]

11.48 [37'-8"]

5.55 [18'-2 1/2"]

4.44 [14'-7"]16.41 [53'-10"]

4.8

5 [1

5'-1

1"]

4.3

7 [

14'-

4"]

2.1

1

13.45 [44'-1 1/2"]

14.6

2 [

47'-

11 1

/2"]

7.6

0 [

24'-

11"]

43.44 [142'-6 1/2"]

25.54 [83'-9 1/2"]

8.06 [26'-5"] 5.64 [18'-6"] 4.62 [15'-2"]10.01 [32'-10"]

7.91 [25'-11 1/2"]7.86 [25'-9 1/2"]

8.07 [26'-5 1/2"]7.78 [25'-6 1/2"] 7.82 [25'-8"]

7.75 [25'-5"]7.83 [25'-8 1/2"]

8.43 [27'-8"]

9.02 [29'-7"]7.04 [23'-1"]

9.08 [29'-9 1/2"]7.63 [25'-0 1/2"]

7.48 [24'-6 1/2"]6.62 [21'-8 1/2"]2.347.50 [24'-7"]2.782.742.730.73

7.63 [25'-0 1/2"]7.77 [25'-5 1/2"]7.80 [25'-7"]4.78 [15'-8"]3.047.83 [25'-8 1/2"]

7.67 [25'-2"]7.84 [25'-8 1/2"]2.945.68 [18'-7 1/2"]8.46 [27'-9"]10.05 [32'-11 1/2"]10.50 [34'-5 1/2"]

11.04 [36'-2 1/2"]

0.7

5

6.68 0.90

6.89

8.0

0

8.00

8.0

3

2.533.20

4.88

1.98 [6'-6"]

1.9

0

12.10

SITE PLAN

PLAN OF EXISTING OFFICE BUILDING SHANTA SRIRAM - TECH PARK

IN SURVEY NO : 126,

SITUATED AT GACHIBOWLI VILLAGE,

SERILINGAMPALLY MANDAL,

RANGA REDDY (DIST)., TELANGANA.

NORTH

9.70

GACHIBOWLI

STADIUM

TO SHAMSHABAD EXPRESS

WAY ROAD

GACHIBOWLI 'X' ROADS

TO ISB & MICRO SOFT ROAD

BO

TA

NIC

AL

GA

RD

EN

DL

F C

YB

ER

CIT

Y

ROAD

IIIT

CA

MP

US

TO

H

YD

ER

AB

AD

C

EN

TR

AL

UN

IVE

RS

ITY

TCS SYNERGY PARK

OP

EN

PL

OT

SITE

ROAD

TO KONDAPUR ROAD

RO

AD

TO

TO

LIC

HO

WK

I

OPEN PLOT

OSR

OSR

OSR

S.No Description Area (Sq.m) Area (Acres) Percentage (%)1. Ground coverage 3499.92 0.86 41.69

2. Internal road 3768.09 0.94 44.87

3. Open Space Reserves (OSR)

813.00 0.20 9.68

4. Area left for road widening

314.93 0.07 3.76

5. Total 8395.94 2.07 100.00

S.No Description Block A & B (Sq.m)

1. Basement 1 6200.00

2. Basement 2 6270.00

3. Basement 3 6340.00

4. Ground Floor 3679.58

5. First Floor 3828.98

6. Second Floor 4341.57

7. Third Floor 4341.57

8. Fourth Floor 4341.57

9. Fifth Floor 4341.57

10. Sixth Floor 4341.57

11. Seventh Floor 4341.57

Total 52367.98

BLOCK 'A' & 'B'

S.No Description Two Wheeler Four Wheeler

1. Basement 1 65 120

2. Basement 2 80 110

3. Basement 3 80 115

Total 225 570

PARKING DETAILS

BUILT-UP AREA

LAND USE BREAK-UP

PROJECT DEVELOPER

SHANTA SRIRAM CONSTRUCTIONS PVT. LTD

501, Oasis Centre, Somajiguda,

Begumpet Main Road, Opp. Pullareddy Sweets,

PLAN OF SHANTA SRIRAM - TECH PARK, GACHIBOWLI VILLAGE, SERILINGAMPALLY MANDAL, RANGA REDDY DISTRICT, TELANGANA.

SCALE:-1:200

AN

NE

XU

RE

- A5

Page 55: FORM Ienvironmentclearance.nic.in/writereaddata/Online/TOR/21_Feb_2018_160644530Y7EQLA6Q...Form - I (As Per New Notification of Mo.E.F dated 1-12-2009 vide SO 3067 (E)) ... As per

LOCATION MAP

INDIA

Wa ra n ga l

TELANGANA

Na lgon da

Kh a m m a m

Adila ba d

Ka rim n a ga rNiza m ba d

Me da k

Ra n ga re dd i

Ma h a bu bn a ga r

LEGEND

RAILWAY TRACK

RIVER

ROAD

DIS TRICT BOUNDARY

S TATE HIGHWAY

TALUK HEADQUARTER

DIS TRICT HEADQUARTER

TOWN

S TREAMS

NATIONAL HIGHWAY

PROJECT S ITERANGA REDDY DISTRICT

Ve n ka ta pu ra m

Ma ilwa rra m

Mirya n

Tandur

S h a h a ba dPargi

Ma rka lNa n ch e rla

Mu h a m m a da ba d

Dom a

Mora n gpa lli

Pe dda m a l

Ela l

Kote pa lli

Pa t lu r

Ma rpa lli

Ch a n gom a l

Chevella

S h a n ka rpa lli

Vikarabad

Ibrahimpatanam

Ya ch a ra m

Ma is a ra m

Bola ra mMa u la Ali

Medchal

HYDERABAD

Tu kku gu da

S e cu n de ra ba dGu n d ipe t

Golkon da

7

7

9

7& 9

Hu s a inS a ga r

PROJECT SITE

ANNEXURE - A6

N

Note : - Not to s ca le

Page 56: FORM Ienvironmentclearance.nic.in/writereaddata/Online/TOR/21_Feb_2018_160644530Y7EQLA6Q...Form - I (As Per New Notification of Mo.E.F dated 1-12-2009 vide SO 3067 (E)) ... As per

N

Kazipet Jn.134.5 km

To

25.7 km

To

Sangareddi

Hyderabad8.7 km

To

Wadi153.0 km

To

Bolarum9.1 km

To

PROJECT SITE PREPARED BY

S ECUNDERABAD

SHOWING 10 km RADIUS

TOPOGRAPHICAL MAP

AN

NE

XU

RE

- A7

M/s. SHANTA SRIRAM CONSTRUCTIONS PVT. LTD., CLIENT :

TITLE :

Ga ch ibowli Villa ge , S e rilin ga m pa lly Ma n da l, Ra n ga Re ddy Dis t r ict , Te la n ga n a .

PROJECT :

PROJECT S ITE

S CALE

3

S u rve y of In d ia Topos h e e t s

5 67

K

5 66

K

5 68

K

5 63

K

5 62

K

5 64

K

5 61 0

K

5 61 1

K

5 61 2

K

In de x to

0 6 km

REFER TO THIS MAP AS : - 1 : 5 0 ,0 0 0

Pu b lis h e d u n de r th e d ire ct ion of

S HEET 5 6 K / 7 FIRS T EDITION

th e S u rve yor Ge n e ra l of In d ia - 2 0 1 2

LEGEND

Page 57: FORM Ienvironmentclearance.nic.in/writereaddata/Online/TOR/21_Feb_2018_160644530Y7EQLA6Q...Form - I (As Per New Notification of Mo.E.F dated 1-12-2009 vide SO 3067 (E)) ... As per

AN

NE

XU

RE

- A8

500 m GOOGLE MAP FOR THE PROJECT

Page 58: FORM Ienvironmentclearance.nic.in/writereaddata/Online/TOR/21_Feb_2018_160644530Y7EQLA6Q...Form - I (As Per New Notification of Mo.E.F dated 1-12-2009 vide SO 3067 (E)) ... As per

PROJECT SITE

GOOGLE EARTH IMAGERY FOR THE PROJECT SITEA

NN

EX

UR

E - A

9

Page 59: FORM Ienvironmentclearance.nic.in/writereaddata/Online/TOR/21_Feb_2018_160644530Y7EQLA6Q...Form - I (As Per New Notification of Mo.E.F dated 1-12-2009 vide SO 3067 (E)) ... As per

ANNEXURE – A10

PROJECT PROPONENT : Shanta Sriram Construction Pvt. Ltd

PROJECT NAME : Shanta Sriram – Tech Park

LOCATION : Gachibowli Village, Serilingampally

Mandal, Ranga Reddy District, Telangana

SUBJECT : Salient features of the project

A. LAND REQUIREMENT

S.No Description Details

1. The area of the project will be 2.07 Acres

2. Total plot area Sq.m 8395.94

3. Built-up area Sq.m 52367.98

4. Parking area Sq.m 18810.00

5. Two wheeler Nos. 225

6. Four wheeler Nos. 570

B. FACILITIES OF THE BUILDING

S. No. Description Height of the Building (m)

1. 1. IT building 30

C. WATER REQUIREMENT

S.No Item Details

7. Source of water: Hyderabad Metropolitan Water Supply & Sewerage Board (HMWS&SB)/Private tankers

8. Operation phase klpd 205

9. Fresh water klpd 205

10. Wastewater generation klpd 154

11. STP Capacity klpd 175

12. Treated wastewater klpd 115

S.No Item Details

13. Source of electricity Telangana Southern Power Distribution Company Limited (TSSPDCL)

14. TSSPDCL kVA Operation phase

3400

15. DG sets for power backup

kVA 2500

16. Fuel requirement Litres per hour

444.77

17. DG sets Number 2 x 1250

Page 60: FORM Ienvironmentclearance.nic.in/writereaddata/Online/TOR/21_Feb_2018_160644530Y7EQLA6Q...Form - I (As Per New Notification of Mo.E.F dated 1-12-2009 vide SO 3067 (E)) ... As per

D. SOLID WASTE GENERATION

COMMERCIAL COMPLEX

S. No. Description Number of units

Number of persons/unit

Total number of persons

1. Block A 1 2606 2606

2. Block B 1 1116 1116

Total persons 3722

S.No Description IT Offices

1. Based on solid waste generation rates in the urban areas, it is estimated per person

0.2 kg

2. Total persons 3722

3. Total waste generation in kg 744

4. Organic waste in kg (55%) 409

5. In-organic waste in kg (45%) 335

S.No. Waste Disposal Details

1. Organic waste Organic wastes will be disposed to local municipal authorities

2. Inorganic waste Inorganic wastes will be disposed to authorize vendors for recycling

Page 61: FORM Ienvironmentclearance.nic.in/writereaddata/Online/TOR/21_Feb_2018_160644530Y7EQLA6Q...Form - I (As Per New Notification of Mo.E.F dated 1-12-2009 vide SO 3067 (E)) ... As per

ANNEXURE – A11

PROJECT PROPONENT : Shanta Sriram Construction Pvt. Ltd

PROJECT NAME : Shanta Sriram – Tech Park

LOCATION : Gachibowli Village, Serilingampally

Mandal, Ranga Reddy District, Telangana

SUBJECT : Water and wastewater balance

A. SOURCE OF WATER : Hyderabad Metropolitan Water Supply &

Sewerage Board (HMWS&SB)/Water tankers B. WATER REQUIREMENT

S.No Description Total no of persons

Drinking (lpd)

Flushing (lpd)

Drinking (klpd)

Flushing (klpd)

Total (klpd)

1. Block – A 2606 5 45 13.03 117.27 130.30

2. Block – B 1116 5 45 5.58 50.22 55.80

3. Visitors (10% Block – A & B)

373 5 45 1.87 16.79 18.66

Sub Total 4095 - - 20.48 184.28 204.76

Total water requirement 205 klpd (Approx.)

WASTEWATER GENERATION

S.No Item Details

1. Total water requirement klpd 205

2. Wastewater generation (75% Domestic and Flushing) (0.75*205 =153.75)

klpd 154

3. Design STP Capacity klpd 175

4. Treated wastewater (75% wastewater generation) (0.75*154 = 115)

klpd 115

TREATED WASTEWATER USAGE

The treated wastewater will be disposed to the existing sewer line

FRESH WATER REQUIREMENT

The fresh water requirement is estimated at 205 klpd

Note: klpd – kilo litres per day lpd – litres per day

Page 62: FORM Ienvironmentclearance.nic.in/writereaddata/Online/TOR/21_Feb_2018_160644530Y7EQLA6Q...Form - I (As Per New Notification of Mo.E.F dated 1-12-2009 vide SO 3067 (E)) ... As per

ANNEXURE – A12

PROJECT PROPONENT : Shanta Sriram Construction Pvt. Ltd

PROJECT NAME : Shanta Sriram – Tech Park

LOCATION : Gachibowli Village, Serilingampally

Mandal, Ranga Reddy District, Telangana

SUBJECT : Power Requirement

S.No Item Details

1. Source of electricity Telangana Southern Power Distribution Company Limited (TSSPDCL)

2. TSSPDCL kVA Construction phase Operation phase

- 3400

3. DG sets for power backup

kVA - 2500

4. Fuel requirement Litres per hour

- 444.77

5. DG sets Number - 2x1250

Page 63: FORM Ienvironmentclearance.nic.in/writereaddata/Online/TOR/21_Feb_2018_160644530Y7EQLA6Q...Form - I (As Per New Notification of Mo.E.F dated 1-12-2009 vide SO 3067 (E)) ... As per

FORM – I

For

“SHANTA SRIRAM – TECH PARK” (Commercial Complex)

At Gachibowli Village, Serilingampally Mandal,

Ranga Reddy District, Telangana

MAY – 2017

PROJECT PROPONENT ENVIRONMENT CONSULTANT

SHANTA SRIRAM CONSTRUCTIONS PVT. LTD., Hyderabad, Telangana.

B.S. ENVI-TECH PVT. LTD., Secunderabad, Telangana. NABET Accreditation: NABET/EIA/1316/RA002

Page 64: FORM Ienvironmentclearance.nic.in/writereaddata/Online/TOR/21_Feb_2018_160644530Y7EQLA6Q...Form - I (As Per New Notification of Mo.E.F dated 1-12-2009 vide SO 3067 (E)) ... As per

2

Form - I (As Per New Notification of Mo.E.F dated 1-12-2009 vide SO 3067 (E))

BASIC INFORMATION

S. No

Item Details

1 Name of the Project/s Commercial complex titled

“Shanta Sriram – Tech Park”

developed by

Shanta Sriram Constructions Pvt. Ltd

(SSCPL)

2 S. No. in the schedule 8(a)

3 Proposed capacity/ area/

length/ tonnage to be

handled/ command area/

lease area/ number of wells to

be drilled

Background

SSCPL constructed a commercial

complex titled “Shanta Sriram - Tech

Park” to be accommodated on a plot

area of 2.07 Acres.

This project is a violation case. A court

case was filed by Telangana Pollution

Control Board in the year 2016. The

judgement was declared on 31.08.2016

with a penalty.

The project did not obtain

Environmental Clearance from SEIAA,

Telangana. However it had constructed

the commercial complex in the year

2016.

Details are furnished in Annexure – 1.

Plot Area : 8395.94 Sq.m

Built-up Area : 52367.98 Sq.m

Building Height : 30 m

IT office and Services

Block A and Block B with (Three

Basements + Ground Floor – Seven

Floors)

Page 65: FORM Ienvironmentclearance.nic.in/writereaddata/Online/TOR/21_Feb_2018_160644530Y7EQLA6Q...Form - I (As Per New Notification of Mo.E.F dated 1-12-2009 vide SO 3067 (E)) ... As per

3

Parking details

Parking Area : 18810.00 Sq.m

Two Wheeler : 225

Four Wheeler : 570

Commercial complex comprising IT

office and Services. The details of the

commercial complex are furnished in

the Annexure – 2.

4 New/ expansion/

modernization

New

5 Existing capacity/ Area etc. Not Applicable

6 Category of Project i.e ‘A’ or ‘B’ Category ‘B’ 7 Does it attract the general

condition? If yes please

specify.

No

8 Does it attract the specific

condition? If yes please

specify.

No

9 Location Location Map of the project site is given

in Annexure – 3.

10 km Radius Map of Survey of India

(SOI) toposheet of the project site is

given in Annexure – 3A.

Google Earth Imagery of the project is

given in Annexure – 3B.

As per GHMC master plan the survey

numbers are designated for commercial

use. The copy of the letter from GHMC

is given in Annexure – 3C.

Photographs of the project site are given

in Annexure – 3D.

Plot/ Survey/ Khasra No 126

Village Gachibowli Village

Tehsil Serilingampally Mandal

District Ranga Reddy

State Telangana

10 Nearest railway station/

airport along with distance in

Kms.

Hitec City Railway Station 4.10 km –

NE

Page 66: FORM Ienvironmentclearance.nic.in/writereaddata/Online/TOR/21_Feb_2018_160644530Y7EQLA6Q...Form - I (As Per New Notification of Mo.E.F dated 1-12-2009 vide SO 3067 (E)) ... As per

4

11 Nearest town, city, district

headquarters along with

distance in kms.

Hyderabad – 15.58 km – SE

12 Village panchayaths, Zilla

parishad, Municipal

Corporation, Local body

(Complete postal addresses

with telephone nos. to be

given)

Gachibowli Village, Serilingampally

Mandal, Ranga Reddy District,

Telangana.

13 Name of the applicant Shanta Sriram Constructions Private

Limited (SSCPL)

14 Registered address M/s. Shanta Sriram Constructions Pvt.

Ltd., 501, Oasis Centre, Somajiguda,

Begumpet Main Road, Opp. Pullareddy

Sweets, Hyderabad – 500016,

Telangana.

15 Address for correspondence Same as above

Name Mr. M. Narsaiah

Designation (Owner /Partner/

CEO)

Managing Director

Address 501, Oasis Centre, Somajiguda,

Begumpet Main Road, Opp. Pullareddy

Sweets, Hyderabad – 500016,

Telangana.

Pincode 500016

E- mail [email protected]

Tele-Fax. +91- 9849955881

16 Details of Alternative sites

examined, if any location of

these sites should be shown

on a toposheet.

Not Applicable, since it is a building

project.

17 Interlinked projects Not Applicable.

18 Whether separate application

of interlinked project has been

submitted?

Not Applicable.

19 If yes, date of submission Not Applicable.

20 If no, reason Not Applicable.

21 Whether the proposal involves

approval/ clearance under: if

yes, details of the same and

their status to be given.

Not Applicable.

Page 67: FORM Ienvironmentclearance.nic.in/writereaddata/Online/TOR/21_Feb_2018_160644530Y7EQLA6Q...Form - I (As Per New Notification of Mo.E.F dated 1-12-2009 vide SO 3067 (E)) ... As per

5

(a) The Forest

(Conservation)Act, 1980

(b) The Wild Life

(Protection)Act, 1972

(c) The CRZ Notification,

1991

22 Whether there is any

Government Order/ Policy

relevant/ relating to the site?

Not Applicable.

23 Forest land involved (hectares) Nil.

24 Whether there is any litigation

pending against the project

and/or land in which the

project is propose to be set

up?

(a) Name of the court

(b) Case No

(c) Orders/ directions of the

court, if any and its relevance

with the proposed project.

Name of the

court

IV AJCJ – CUM – XXV

Metropolitan Magistrate,

Cyberabad, Kukatpally,

Miyapur

Case No 1082/2016

Court Order

received

31st Aug 2016

The copy of court order is given in

Annexure – 4.

25 Estimated Cost of Project Rs. 150 Crores

(I) Activity

1. Construction, operation or decommissioning of the Project involving

actions, which will cause physical changes in the locality (Topography,

land use, changes in water bodies, etc.)

S.No Information/Checklist

confirmation

Yes/No

Details thereof (with

approximate quantities /rates,

wherever possible) with source

of information data

1.1 Permanent or temporary

change in land use, land cover

or topography including

increase in intensity of land

use (with respect to local

land use plan)

Yes SSCPL constructed a commercial

complex titled “Shanta Sriram – Tech Park” on a plot area of

8395.94 Sq.m. (2.07 Acres)

Commercial complex comprising

two blocks of IT office and

Services (Three Basements +

Ground Floor – Seven Floors).

1.2 Clearance of existing land,

vegetation and buildings?

No Not Applicable.

Page 68: FORM Ienvironmentclearance.nic.in/writereaddata/Online/TOR/21_Feb_2018_160644530Y7EQLA6Q...Form - I (As Per New Notification of Mo.E.F dated 1-12-2009 vide SO 3067 (E)) ... As per

6

1.3 Creation of new land uses?

Yes The land use of the site is

earmarked as commercial

development as per GHMC,

Hyderabad

The master plan of the project is

given in Annexure – 5.

1.4 Pre-construction investigations

e.g. bore houses, soil testing?

No Not Applicable.

1.5 Construction works?

Yes Built-up area : 52367.98 Sq.m

Please refer Annexure – 2.

1.6 Demolition works? No Not Applicable.

1.7 Temporary sites used for

construction works or housing

of construction workers?

No Not Applicable. The construction

of the Shanta Sriram – Tech Park

was already completed.

1.8 Above ground buildings,

structures or earthworks

including linear structures, cut

and fill or excavations

Yes The project will have two blocks

namely A and B with Three

Basements + Ground floor –

Seven Floors. Please refer

Annexure – 2.

1.9 Underground works including

mining or tunneling?

No Not Applicable.

1.10 Reclamation works? No Not Applicable.

1.11 Dredging? No Not Applicable.

1.12 Offshore structures? No Not Applicable.

1.13 Production and manufacturing

processes?

No No production / manufacturing

process are involved. This is a

building construction project.

1.14 Facilities for storage of goods or materials?

No Not Applicable. The construction

of the project was already

completed.

1.15 Facilities for treatment or

disposal of solid waste or

liquid effluents?

Yes Liquid Waste:

Operation Phase:

The wastewater generated during

operation phase will be treated to

conform to TSPCB standards in a

sewage treatment plant. Treated

wastewater will be disposed to

existing sewer line.

Page 69: FORM Ienvironmentclearance.nic.in/writereaddata/Online/TOR/21_Feb_2018_160644530Y7EQLA6Q...Form - I (As Per New Notification of Mo.E.F dated 1-12-2009 vide SO 3067 (E)) ... As per

7

Solid Waste

Operation Phase:

The solid wastes generated during

operation phase will consist of

mainly used paper, cartons,

thermocol, plastics, polythene

bags, corrugated boxes, glass,

and organic waste from kitchen.

Solid waste generation calculation

is enclosed as Annexure – 6.

The inorganic wastes will be

disposed to authorize vendors for

recycling and the organic wastes

will be disposed to local municipal

authorities.

1.16 Facilities for long term housing

of operational workers?

No Not Applicable.

1.17 New road, rail or sea traffic

during construction or

operation?

No Not Applicable.

1.18 New road, rail, air waterborne

or other transport

infrastructure including new

or altered routes and stations,

ports, airports etc?

No Not Applicable.

1.19 Closure or diversion of existing

transport routes or

infrastructure leading to

changes in traffic

movements?

No Not Applicable.

1.20 New or diverted transmission

lines or pipelines?

No Not Applicable.

1.21 Impoundment, damming,

culverting, realignment or

other changes to the hydrology

of watercourses or aquifers?

No Not Applicable.

1.22 Stream crossings? No Not Applicable.

Page 70: FORM Ienvironmentclearance.nic.in/writereaddata/Online/TOR/21_Feb_2018_160644530Y7EQLA6Q...Form - I (As Per New Notification of Mo.E.F dated 1-12-2009 vide SO 3067 (E)) ... As per

8

1.23 Abstraction or transfers of

from ground or surface

waters?

No Not Applicable.

1.24 Changes in water bodies or the

land surface affecting drainage

or run-off?

No Not Applicable.

1.25 Transport of personnel or

materials for construction,

operation or decommissioning?

No Not Applicable. The construction

of the project was already

completed.

1.26 Long-term dismantling or

decommissioning or

restoration works?

No Not Applicable.

1.27 Ongoing activity during

decommissioning which could

have an impact on the

environment?

No Not Applicable.

1.28 Influx of people to an area in

either temporarily or

permanently?

Yes There will be influx of people

during operation.

1.29 Introduction of alien species? No Not Applicable.

1.30 Loss of native species or

genetic diversity?

No Not Applicable.

1.31 Any other actions? No Not Applicable.

2. Use of Natural resources for construction or operation of the Project

(such as land, water, materials or energy, especially any resources

which are non-renewable or in short supply):

S. No.

Information/checklist

confirmation

Yes/No

Details thereof (with

approximate quantities /rates,

wherever possible) with source

of information data

2.1 Land especially undeveloped or

agricultural land (ha)

No Commercial complex titled

“Shanta Sriram – Tech Park” was

already completed in an area of

2.07 Acres. Commercial complex

comprising IT office and Services.

Please refer Annexure – 2.

2.2 Water (expected source &

competing users) unit: KLD

Yes Total water requirement of the

project during operation phase is

estimated 205 klpd which is

sourced from HMWS&SB/Private

Page 71: FORM Ienvironmentclearance.nic.in/writereaddata/Online/TOR/21_Feb_2018_160644530Y7EQLA6Q...Form - I (As Per New Notification of Mo.E.F dated 1-12-2009 vide SO 3067 (E)) ... As per

9

tanker.

The fresh water requirement is

205 klpd. A STP of 175 klpd

capacity has already constructed.

It is estimated that about 115

klpd of treated wastewater is

disposed to existing sewer line.

The details of the water

requirement are furnished in the

Annexure – 7.

2.3 Minerals (MT) No Not Applicable

2.4 Construction material – stone,

aggregates, sand / soil

(expected source – MT)

No Not Applicable. Since the

construction is completed.

2.5 Forests and timber (source –

MT)

No Not required.

2.6 Energy including electricity and

fuels (source, competing users)

Unit: fuel (MT), energy (MW)

Yes The estimated power requirement

for the project is 3400 kVA. The

details of the power requirement

are furnished in the

Annexure – 8.

2.7 Any other natural resources

(use appropriate standard

units)

No Not Applicable.

3. Use, storage, transport, handling or production of substances or

materials, which could be harmful to human health or the environment

or raise concerns about actual or perceived risks to human health.

S. No.

Information/Checklist confirmation

Yes/No

Details thereof (with approximate quantities/ rates, wherever possible) with source of information data

3.1 Use of substances or materials,

which are hazardous (as per

MSIHC rules) to human health

or the environment (flora,

fauna, and water supplies)

Yes Used batteries, used lube oil from

DG sets.

3.2 Changes in occurrence of

disease or affect disease vectors

(e.g. insect or water borne

diseases)

No Nil.

Page 72: FORM Ienvironmentclearance.nic.in/writereaddata/Online/TOR/21_Feb_2018_160644530Y7EQLA6Q...Form - I (As Per New Notification of Mo.E.F dated 1-12-2009 vide SO 3067 (E)) ... As per

10

3.3 Affect the welfare of people e.g.

by changing living conditions?

Yes The project will result in

secondary employment in terms

of service providers/facilities

management.

Employment Number of

persons

Operation phase 30

3.4 Vulnerable groups of people

who could be affected by the

project e.g. hospital patients,

children, the elderly etc.,

No Nil.

3.5 Any other causes No Nil.

4. Production of solid wastes during construction or operation or

decommissioning (MT/month)

S. No.

Information/Checklist

confirmation

Yes/No

Details thereof (with

approximate quantities/ rates,

wherever possible) with source

of information data

4.1 Spoil, overburden or mine

wastes

No Not Applicable.

4.2 Municipal waste (domestic and

or commercial wastes)

Yes The solid wastes generated during

operation phase will consist of

mainly used paper, cartons,

thermocol, plastics, polythene

bags, corrugated boxes, glass,

and organic waste from kitchen.

Please refer Annexure – 4.

The inorganic wastes will be

disposed to authorize vendors for

recycling and the organic wastes

will be disposed to local municipal

authorities.

4.3 Hazardous wastes (as per

Hazardous Waste

Management Rules)

Yes No hazardous waste will be

released from the project except

used oil from DG sets.

4.4 Other industrial process wastes No Not Applicable.

4.5 Surplus product No Not Applicable.

4.6 Sewage sludge or other sludge

from effluent treatment

Yes Dewatered/dried sludge from STP

(Sewage Treatment Plant) will be

Page 73: FORM Ienvironmentclearance.nic.in/writereaddata/Online/TOR/21_Feb_2018_160644530Y7EQLA6Q...Form - I (As Per New Notification of Mo.E.F dated 1-12-2009 vide SO 3067 (E)) ... As per

11

disposed to local vendors.

4.7 Construction or demolition

wastes

No Not Applicable.

4.8 Redundant machinery or

equipment

No Not Applicable

4.9 Contaminated soils or other

materials

No Not applicable

4.10 Agricultural wastes No Not Applicable

4.11 Other solid wastes No Not Applicable

5. Release of pollutants / hazardous, toxic or noxious substances to air

(Kg/hr)

S. No.

Information/Checklist confirmation

Yes/No

Details thereof (with approximate quantities/ rates, wherever possible) with source of information data

5.1 Emissions from combustion of

fossil fuels from stationary or

mobile sources

Yes The operation of project does not

envisage any air pollution sources

except emission from emergency

backup DG sets.

5.2 Emissions from production

processes

No Not Applicable, since it is a

building project.

5.3 Emissions from materials

handling including storage or

transport

No Not Applicable.

5.4 Emissions from construction

activities including plant and

equipment

No Not Applicable.

5.5 Dust or odours from handling of materials including construction materials, sewage and waste

No Not Applicable.

5.6 Emissions from incineration of

waste

No Not Applicable.

5.7 Emissions from burning of

waste in open air (e.g. slash

materials, construction debris)

No Not Applicable.

5.8 Emissions from any other

sources

No Not Applicable.

Page 74: FORM Ienvironmentclearance.nic.in/writereaddata/Online/TOR/21_Feb_2018_160644530Y7EQLA6Q...Form - I (As Per New Notification of Mo.E.F dated 1-12-2009 vide SO 3067 (E)) ... As per

12

6. Generation of Noise and Vibration, and Emissions of Light and Heat:

S. No.

Information/Checklist

confirmation

Yes/No

Details thereof (with

approximate quantities/ rates,

wherever possible) with source

of information data with source

of information data

6.1 From operation of equipment

e.g. engines, ventilation plant,

crushers

No Not Applicable

6.2 From industrial or similar

processes

No Not Applicable.

6.3 From construction or

demolition

No Not Applicable.

6.4 From blasting or piling No Not Applicable.

6.5 From construction or

operational traffic

No Not Applicable.

6.6 From lighting or cooling

systems

No Not applicable

6.7 From any other sources No Not applicable

7. Risks of contamination of land or water from releases of pollutants into

the ground or into sewers, surface waters, groundwater, coastal waters

or the sea:

S. No.

Information/Checklist

confirmation

Yes/No

Details thereof (with

approximate quantities/rates,

wherever possible) with source

of information data

7.1 From handling, storage, use or

spillage of hazardous materials

No Not Applicable.

7.2 From discharge of sewage or

other effluents to water or the

land (expected mode and place

of discharge)

Yes Treated wastewater will be disposed

into the nearby sewer line.

7.3 By deposition of pollutants

emitted to air into the land or

into water

Yes Emission from DG sets.

7.4 From any other sources No The waste water is treated in a

STP and discharged into the

sewer line.

Page 75: FORM Ienvironmentclearance.nic.in/writereaddata/Online/TOR/21_Feb_2018_160644530Y7EQLA6Q...Form - I (As Per New Notification of Mo.E.F dated 1-12-2009 vide SO 3067 (E)) ... As per

13

7.5 Is there a risk of long term

buildup of pollutants in the

environment from these

sources?

No None.

8. Risk of accidents during construction or operation of the Project,

which could affect human health or the environment

S. No.

Information/Checklist

confirmation

Yes/No

Details thereof (with

approximate quantities/rates,

wherever possible) with source

of information data

8.1 From explosions, spillages, fires

etc from storage, handling, use

or production of hazardous

substances

No Not Applicable.

8.2 From any other causes No None.

8.3 Could the project be affected by

natural disasters causing

environmental damage (e.g.

floods, earthquakes, landslides,

cloudburst etc.)?

No The project is in inland area. The

project site falls under Zone II,

according to the Standard India

Seismic Zone Map (2014). The

structures shall be designed with

adequate safety factors.

9. Factors which should be considered (such as consequential

development) which could lead to environmental effects or the

potential for cumulative impacts with other existing or planned

activities in the locality

S. No.

Information/Checklist

confirmation

Yes/No

Details thereof (with

approximate quantities/ rates,

wherever possible) with source

of information data

9.1 Lead to development of supporting utilities, ancillary development or development stimulated by the project which could have impact on the environment e.g.: Supporting infrastructure (roads, power supply, waste or waste water treatment, etc.)

Yes

Supporting infrastructure within the project site will be developed.

Page 76: FORM Ienvironmentclearance.nic.in/writereaddata/Online/TOR/21_Feb_2018_160644530Y7EQLA6Q...Form - I (As Per New Notification of Mo.E.F dated 1-12-2009 vide SO 3067 (E)) ... As per

14

Housing development Yes This project will provide impetus for housing development in surrounding areas.

Extractive industries No Not Applicable

Supply industries No Not Applicable

Other Yes Unskilled/semiskilled/skilled

labour will be employed for facility

maintenance services and other

services.

9.2 Lead to after-use of the site, which could have an impact on the environment

No Not applicable.

9.3 Set a precedent for later developments

No Not Applicable.

9.4 Have cumulative effects due to proximity to other existing or planned projects with similar effects

Yes The area is earmarked for commercial use as per GHMC master plan.

(II) Environmental Sensitivity

S. No.

Areas Name/ Identity

Aerial distance (within 15 km.) project location boundary

1 Areas protected under

international conventions,

national or local legislation for

their ecological, landscape,

cultural or other related value

Golconda Fort

Qtub Shahi Tombs

Charminar

Mecca Masjid

Chowmahalla Palace

Birla Temple

8.50 km – SSE

7.00 km – SSE

15.80 km – SE

15.40 km – SE

15.70 km – SE

12.90 km – E

2 Areas which are important or

sensitive for ecological reasons

- Wetlands, watercourses or

other water bodies, coastal

zone, biospheres, mountains,

forests

Water Bodies

Musi River

Hussain Sagar

Durgam Cheruvu

Himayatsagar

Osman Sagar

Suraram Cheruvu

Pedda Cheruvu

7.00 km – S

11.60 km – ESE

3.50 km – SE

11.40 km – S

7.50 km – SW

4.80 km – E

2.70 km – SSE

Page 77: FORM Ienvironmentclearance.nic.in/writereaddata/Online/TOR/21_Feb_2018_160644530Y7EQLA6Q...Form - I (As Per New Notification of Mo.E.F dated 1-12-2009 vide SO 3067 (E)) ... As per

15

Kamunoni Cheruvu

Maisamma Cheruvu

Nerla Cheruvu

Gopi Cheruvu

Nallagandla

Cheruvu

ICRISAT Lake

Vanam Cheruvu

Mella Cheruvu

Kotha Cheruvu

5.10 km – ENE

6.10 km – ENE

1.60 km – NNE

3.8 km – NW

4.6 km – WNW

10.0 km – WNW

7.4 km – WNW

7.5 km – WNW

7.5 km – SW

Reserved Forest

(RF)

Kottaguda RF

Gaganpahad RF

Domnair RF

Chilkur Protected

Forest

8.50 km – SSE

9.00 km – S

3 Areas used by protected,

important or sensitive species

of flora or fauna for breeding,

nesting, foraging, resting, over

wintering, migration

Mrugavani National

Park

Kasu Brahmananda

Reddy National Park

Nehru Zoological

Park

10.77 km – SSW

6.80 km – ESE

14.0 km – SE

4 Inland, coastal, marine or

underground waters

Inland Not Applicable.

5 State, National boundaries Telangana –

Karnataka

(State Boundary)

70.0 km – W

6 Routes or facilities used by the

public for access to recreation

or other tourist, pilgrim areas

None Not Applicable

7 Defence installations Greyhound facility 9.50 km – SSW

8 Densely populated or built-up

area

Hyderabad

Population –

39,43,323

Ranga Reddy

District Population –

52,96,741

Census Data – 2011

15.58 km –SE

Page 78: FORM Ienvironmentclearance.nic.in/writereaddata/Online/TOR/21_Feb_2018_160644530Y7EQLA6Q...Form - I (As Per New Notification of Mo.E.F dated 1-12-2009 vide SO 3067 (E)) ... As per

16

9 Areas occupied by sensitive

man-made land uses

(hospitals, schools, places of

worship, community facilities)

Schools

NASR Boys school

Euro School

The Gaudium school

Oakridge

International School

Meridian School

Green Gables

International School

Hillside School

Rockwell

International School

1.86 km – ESE

2.46 km – SE

2.76 km – SSW

3.20 km – SSE

3.21 km – ENE

3.88 km – ENE

4.64 km – SE

4.73 km – ESE

Colleges

International

Institute of

Information

Technology

Indian School of

Business

National Institute of

Fashion Technology

Sri Venkateshwara

College of Pharmacy

0.68 km – W

2.00 km – SW

3.07 km – ENE

3.22 km – ESE

Hospitals

Himagiri Hospital

KIMS hospital

Pace Hospital

Care Hospital

Omni Hospital

Citizen Hospital

Srikara Hospital

0.60 km – SE

2.53 km – NE

3.14 km – E

2.55 km – SE

4.79 km – E

5.37 km – NW

5.01 km – NNW

Page 79: FORM Ienvironmentclearance.nic.in/writereaddata/Online/TOR/21_Feb_2018_160644530Y7EQLA6Q...Form - I (As Per New Notification of Mo.E.F dated 1-12-2009 vide SO 3067 (E)) ... As per

17

10 Areas containing important,

high quality or scarce resources

(ground water resources,

surface resources, forestry,

agriculture, fisheries, tourism,

minerals)

Water Bodies

Musi River

Hussain Sagar

Durgam Cheruvu

Himayatsagar

Osman Sagar

Suraram Cheruvu

Pedda Cheruvu

Kamunoni Cheruvu

Maisamma Cheruvu

Nerla Cheruvu

Gopi Cheruvu

Nallagandla

Cheruvu

ICRISAT Lake

Vanam Cheruvu

Mella Cheruvu

Kotha Cheruvu

7.00 km – S

11.60 km – ESE

3.50 km – SE

11.40 km – S

7.50 km – SW

4.80 km – E

2.70 km – SSE

5.10 km – ENE

6.10 km – ENE

1.60 km – NNE

3.8 km – NW

4.6 km – WNW

10.0 km – WNW

7.4 km – WNW

7.5 km – WNW

7.5 km – SW

11 Areas already subjected to

pollution or environmental

damage. (those where existing

legal environmental standards

are exceeded)

None Not Applicable

12 Areas susceptible to natural

hazard which could cause

the project to present

environmental problems

(earthquakes, subsidence,

landslides, erosion, flooding or

extreme or adverse climatic

conditions)

Nil. The project area

is inland and falls

under Zone II,

according to the

Standard India

Seismic Zone Map

(2014).

Not Applicable

Page 80: FORM Ienvironmentclearance.nic.in/writereaddata/Online/TOR/21_Feb_2018_160644530Y7EQLA6Q...Form - I (As Per New Notification of Mo.E.F dated 1-12-2009 vide SO 3067 (E)) ... As per
Page 81: FORM Ienvironmentclearance.nic.in/writereaddata/Online/TOR/21_Feb_2018_160644530Y7EQLA6Q...Form - I (As Per New Notification of Mo.E.F dated 1-12-2009 vide SO 3067 (E)) ... As per

PROJECT PROPONENT : Shanta Sriram Construction Pvt. Ltd

PROJECT NAME : Shanta Sriram – Tech Park

LOCATION : Gachibowli Village, Serilingampally

Mandal, Ranga Reddy District, Telangana

SUBJECT : Form 1

LIST OF ANNEXURES

S. No. ANNEXURES NUMBER

DESCRIPTION

1. Annexure – 1 Chronology of the project

2. Annexure – 2 Facilities of the Tech Park

3. Annexure – 3 Location Map

4. Annexure – 3A 10 km Radius Map

5. Annexure – 3B Google Earth Imagery

6. Annexure – 3C Copy of HMDA letter

7. Annexure – 3D Photographs of the site

8. Annexure – 4 Copy of the court order

9. Annexure – 5 Master plan of the project

10. Annexure – 6 Solid waste generation

11. Annexure – 7 Water and wastewater balance

12. Annexure – 8 Power requirement

Page 82: FORM Ienvironmentclearance.nic.in/writereaddata/Online/TOR/21_Feb_2018_160644530Y7EQLA6Q...Form - I (As Per New Notification of Mo.E.F dated 1-12-2009 vide SO 3067 (E)) ... As per

ANNEXURE – 1

PROJECT PROPONENT : Shanta Sriram Construction Pvt. Ltd

PROJECT NAME : Shanta Sriram – Tech Park

LOCATION : Gachibowli Village, Serilingampally

Mandal, Ranga Reddy District, Telangana

SUBJECT : Chronology of the project

COMMERCIAL COMPLEX SHANTA SRIRAM – TECH PARK

S.No. Description Status

1. Date of Land Acquisition 2005

2. Date of Application to GHMC for plan

approval (Old)

2008

3. Date of Application to GHMC for plan

approval (Revised)

2013

4. Permit No. (Old - 2008) G/104/BP/WZ/447/08

5. Date of GHMC plan Approval (Old

2008)

23.09.2008

6. Application No. (Revised 2013) 62846/24/07/2013/HO

7. Permit No. (Revised 2013) 40076/HO/WZ/Cir-11/2015

8. Date of GHMC plan Approval 13.03.2015

9. Date of start of construction 2005

10. Date of completion of construction 2016

11. Application to SEIAA, AP 27.07.2013

12. Letter vide No. SEIAA/AP/RRD-2013-3786

13. SEIAA, Andhra Pradesh letter dated 25.09.2013

14. Court case filed by Department of

Environment

May 2016

15. Name of the court IV AJCJ – CUM – XXV

Metropolitan Magistrate,

Cyberabad, Kukatpally,

Miyapur

16. Court Case No. 1082/2016

17. Status of the court case Court case was cleared on

31.08.2016

18. Court order Penalty of Rs. 30,000/- was

paid by the project proponent

Page 83: FORM Ienvironmentclearance.nic.in/writereaddata/Online/TOR/21_Feb_2018_160644530Y7EQLA6Q...Form - I (As Per New Notification of Mo.E.F dated 1-12-2009 vide SO 3067 (E)) ... As per

ANNEXURE – 2

PROJECT PROPONENT : Shanta Sriram Construction Pvt. Ltd

PROJECT NAME : Shanta Sriram – Tech Park

LOCATION : Gachibowli Village, Serilingampally

Mandal, Ranga Reddy District, Telangana

SUBJECT : Facilities of the project

COMMERCIAL COMPLEX SHANTA SRIRAM – TECH PARK

A. FACILITIES OF THE PROJECT

S.No Description Height of the Building (m)

1. IT Office 30

B. LAND USE BREAK-UP

S.No Description Area (Sq.m) Area (Acres) Percentage (%)

1. Ground coverage 3499.92 0.86 41.69

2. Internal road 3768.09 0.94 44.87

3. Open Space Reserves (OSR)

813.00 0.20 9.68

4. Area left for road widening

314.93 0.07 3.76

5. Total 8395.94 2.07 100.00

C. BUILT-UP AREA

S.No Description Block A & B (Sq.m)

1. Basement – 1 6200.00

2. Basement – 2 6270.00

3. Basement – 3 6340.00

4. Ground Floor 3679.58

5. First Floor 3828.98

6. Second Floor 4341.57

7. Third Floor 4341.57

8. Fourth Floor 4341.57

9. Fifth Floor 4341.57

10. Sixth Floor 4341.57

11. Seventh Floor 4341.57

Total 52367.98

D. PARKING DETAILS

BLOCK „A‟ & „B‟ S.No Description Two Wheeler Four Wheeler

1. Basement – 1 65 120

2. Basement – 2 80 110

3. Basement – 3 80 115

Total 225 570

Page 84: FORM Ienvironmentclearance.nic.in/writereaddata/Online/TOR/21_Feb_2018_160644530Y7EQLA6Q...Form - I (As Per New Notification of Mo.E.F dated 1-12-2009 vide SO 3067 (E)) ... As per

LOCATION MAP

INDIA

Wa ra n ga l

TELANGANA

Na lgon da

Kh a m m a m

Adila ba d

Ka rim n a ga rNiza m ba d

Me da k

Ra n ga re dd i

Ma h a bu bn a ga r

LEGEND

RAILWAY TRACK

RIVER

ROAD

DIS TRICT BOUNDARY

S TATE HIGHWAY

TALUK HEADQUARTER

DIS TRICT HEADQUARTER

TOWN

S TREAMS

NATIONAL HIGHWAY

PROJECT S ITERANGA REDDY DISTRICT

Ve n ka ta pu ra m

Ma ilwa rra m

Mirya n

Tandur

S h a h a ba dPargi

Ma rka lNa n ch e rla

Mu h a m m a da ba d

Dom a

Mora n gpa lli

Pe dda m a l

Ela l

Kote pa lli

Pa t lu r

Ma rpa lli

Ch a n gom a l

Chevella

S h a n ka rpa lli

Vikarabad

Ibrahimpatanam

Ya ch a ra m

Ma is a ra m

Bola ra mMa u la Ali

Medchal

HYDERABAD

Tu kku gu da

S e cu n de ra ba dGu n d ipe t

Golkon da

7

7

9

7& 9

Hu s a inS a ga r

PROJECT SITE

ANNEXURE - 3

N

Note : - Not to s ca le

Page 85: FORM Ienvironmentclearance.nic.in/writereaddata/Online/TOR/21_Feb_2018_160644530Y7EQLA6Q...Form - I (As Per New Notification of Mo.E.F dated 1-12-2009 vide SO 3067 (E)) ... As per

N

Kazipet Jn.134.5 km

To

25.7 km

To

Sangareddi

Hyderabad8.7 km

To

Wadi153.0 km

To

Bolarum9.1 km

To

PROJECT SITE PREPARED BY

S ECUNDERABAD

SHOWING 10 km RADIUS

TOPOGRAPHICAL MAP

AN

NE

XU

RE

- 3A

M/s. SHANTA SRIRAM CONSTRUCTIONS PVT. LTD., CLIENT :

TITLE :

Ga ch ibowli Villa ge , S e rilin ga m pa lly Ma n da l, Ra n ga Re ddy Dis t r ict , Te la n ga n a .

PROJECT :

PROJECT S ITE

S CALE

3

S u rve y of In d ia Topos h e e t s

5 67

K

5 66

K

5 68

K

5 63

K

5 62

K

5 64

K

5 61 0

K

5 61 1

K

5 61 2

K

In de x to

0 6 km

REFER TO THIS MAP AS : - 1 : 5 0 ,0 0 0

Pu b lis h e d u n de r th e d ire ct ion of

S HEET 5 6 K / 7 FIRS T EDITION

th e S u rve yor Ge n e ra l of In d ia - 2 0 1 2

LEGEND

Page 86: FORM Ienvironmentclearance.nic.in/writereaddata/Online/TOR/21_Feb_2018_160644530Y7EQLA6Q...Form - I (As Per New Notification of Mo.E.F dated 1-12-2009 vide SO 3067 (E)) ... As per

PROJECT SITE

GOOGLE EARTH IMAGERY FOR THE PROJECT SITEA

NN

EX

UR

E - 3

B

Page 87: FORM Ienvironmentclearance.nic.in/writereaddata/Online/TOR/21_Feb_2018_160644530Y7EQLA6Q...Form - I (As Per New Notification of Mo.E.F dated 1-12-2009 vide SO 3067 (E)) ... As per
Page 88: FORM Ienvironmentclearance.nic.in/writereaddata/Online/TOR/21_Feb_2018_160644530Y7EQLA6Q...Form - I (As Per New Notification of Mo.E.F dated 1-12-2009 vide SO 3067 (E)) ... As per
Page 89: FORM Ienvironmentclearance.nic.in/writereaddata/Online/TOR/21_Feb_2018_160644530Y7EQLA6Q...Form - I (As Per New Notification of Mo.E.F dated 1-12-2009 vide SO 3067 (E)) ... As per

ANNEXURE – 3D

PHOTOGRAPHS SHOWING THE PROJECT

Page 90: FORM Ienvironmentclearance.nic.in/writereaddata/Online/TOR/21_Feb_2018_160644530Y7EQLA6Q...Form - I (As Per New Notification of Mo.E.F dated 1-12-2009 vide SO 3067 (E)) ... As per
Page 91: FORM Ienvironmentclearance.nic.in/writereaddata/Online/TOR/21_Feb_2018_160644530Y7EQLA6Q...Form - I (As Per New Notification of Mo.E.F dated 1-12-2009 vide SO 3067 (E)) ... As per
Page 92: FORM Ienvironmentclearance.nic.in/writereaddata/Online/TOR/21_Feb_2018_160644530Y7EQLA6Q...Form - I (As Per New Notification of Mo.E.F dated 1-12-2009 vide SO 3067 (E)) ... As per
Page 93: FORM Ienvironmentclearance.nic.in/writereaddata/Online/TOR/21_Feb_2018_160644530Y7EQLA6Q...Form - I (As Per New Notification of Mo.E.F dated 1-12-2009 vide SO 3067 (E)) ... As per
Page 94: FORM Ienvironmentclearance.nic.in/writereaddata/Online/TOR/21_Feb_2018_160644530Y7EQLA6Q...Form - I (As Per New Notification of Mo.E.F dated 1-12-2009 vide SO 3067 (E)) ... As per

PROPOSED EXISTING

DISMENTLE SCALE 1: 100 M

REFERENCESREFERENCES

BUILDERS SIGNATUREENGINEER SIGNATUREARCHITECT SIGNATURE

D.G.P.A. HOLDER SIGNATURE

AREA DETAILS :

LOCATION PLANNOT TO SCALE

DUCT

PROPOSED

BUILDING

PROPOSED

BUILDING

DUCT

19.36 Smt

30' WIDE ROAD30' WIDE ROAD

130.00 smt

30

' W

IDE

RO

AD

180.00 smt

30' WIDE ROAD

OSR

53.00 smt

SIDE OPEN SPACE

SIDE OPEN SPACE

SIDE OPEN SPACESIDE OPEN SPACE

RE

AR

O

PE

N S

PA

CE

FR

ON

T O

PE

N S

PA

CE

EF

F.

UN

DE

R R

OA

D W

IDE

NIN

G A

RE

A :

31

4.9

3 S

mt

450.00 smt

15.00 [49'-2 1/2"]

14.00 [45'-11"]

8.0411.81

5.6

8

17.23

8.00

8.0

0

8.7

3

8.0

7

11.8

0

3.71

19.44

25.0

8 [

82'-

3 1

/2"]

26.92 [88'-4"]13.23 [43'-5"]

7.51 [24'-7 1/2"]23.35 [76'-7 1/2"]

17.13 [56'-2"]

3.46

14.00 [45'-11"]

19.11 [62'-8 1/2"]

7.48 [24'-6 1/2"]

64.5830.33

8.2

7

27.44

16.65

7.91

15.21

16.49

8.7

5

9.1

1

8.0

4

8.4

7

0.9

0

23.36

2.3

1

31.0

9

10.00

1.9

0

11.17

2.4

5

10.771.56 11.24

1.3

8 5.15

0.5

5

5.74

0.9

8

10.46

0.4

6 5.59

1.3

0 4.65

8.1

25.6

9

9.10

9.69

8.2

0

8.0

0

11.23 [36'-10"]

11.61 [38'-1"]

11.48 [37'-8"]

5.55 [18'-2 1/2"]

4.44 [14'-7"]16.41 [53'-10"]

4.8

5 [1

5'-1

1"]

4.3

7 [

14'-

4"]

2.1

1

13.45 [44'-1 1/2"]

14.6

2 [

47'-

11 1

/2"]

7.6

0 [

24'-

11"]

43.44 [142'-6 1/2"]

25.54 [83'-9 1/2"]

8.06 [26'-5"] 5.64 [18'-6"] 4.62 [15'-2"]10.01 [32'-10"]

7.91 [25'-11 1/2"]7.86 [25'-9 1/2"]

8.07 [26'-5 1/2"]7.78 [25'-6 1/2"] 7.82 [25'-8"]

7.75 [25'-5"]7.83 [25'-8 1/2"]

8.43 [27'-8"]

9.02 [29'-7"]7.04 [23'-1"]

9.08 [29'-9 1/2"]7.63 [25'-0 1/2"]

7.48 [24'-6 1/2"]6.62 [21'-8 1/2"]2.347.50 [24'-7"]2.782.742.730.73

7.63 [25'-0 1/2"]7.77 [25'-5 1/2"]7.80 [25'-7"]4.78 [15'-8"]3.047.83 [25'-8 1/2"]

7.67 [25'-2"]7.84 [25'-8 1/2"]2.945.68 [18'-7 1/2"]8.46 [27'-9"]10.05 [32'-11 1/2"]10.50 [34'-5 1/2"]

11.04 [36'-2 1/2"]

0.7

5

6.68 0.90

6.89

8.0

0

8.00

8.0

3

2.533.20

4.88

1.98 [6'-6"]

1.9

0

12.10

SITE PLAN

PLAN OF EXISTING OFFICE BUILDING SHANTA SRIRAM - TECH PARK

IN SURVEY NO : 126,

SITUATED AT GACHIBOWLI VILLAGE,

SERILINGAMPALLY MANDAL,

RANGA REDDY (DIST)., TELANGANA.

NORTH

9.70

GACHIBOWLI

STADIUM

TO SHAMSHABAD EXPRESS

WAY ROAD

GACHIBOWLI 'X' ROADS

TO ISB & MICRO SOFT ROAD

BO

TA

NIC

AL

GA

RD

EN

DL

F C

YB

ER

CIT

Y

ROAD

IIIT

CA

MP

US

TO

H

YD

ER

AB

AD

C

EN

TR

AL

UN

IVE

RS

ITY

TCS SYNERGY PARK

OP

EN

PL

OT

SITE

ROAD

TO KONDAPUR ROAD

RO

AD

TO

TO

LIC

HO

WK

I

OPEN PLOT

OSR

OSR

OSR

S.No Description Area (Sq.m) Area (Acres) Percentage (%)1. Ground coverage 3499.92 0.86 41.69

2. Internal road 3768.09 0.94 44.87

3. Open Space Reserves (OSR)

813.00 0.20 9.68

4. Area left for road widening

314.93 0.07 3.76

5. Total 8395.94 2.07 100.00

S.No Description Block A & B (Sq.m)

1. Basement 1 6200.00

2. Basement 2 6270.00

3. Basement 3 6340.00

4. Ground Floor 3679.58

5. First Floor 3828.98

6. Second Floor 4341.57

7. Third Floor 4341.57

8. Fourth Floor 4341.57

9. Fifth Floor 4341.57

10. Sixth Floor 4341.57

11. Seventh Floor 4341.57

Total 52367.98

BLOCK 'A' & 'B'

S.No Description Two Wheeler Four Wheeler

1. Basement 1 65 120

2. Basement 2 80 110

3. Basement 3 80 115

Total 225 570

PARKING DETAILS

BUILT-UP AREA

LAND USE BREAK-UP

PROJECT DEVELOPER

SHANTA SRIRAM CONSTRUCTIONS PVT. LTD

501, Oasis Centre, Somajiguda,

Begumpet Main Road, Opp. Pullareddy Sweets,

PLAN OF SHANTA SRIRAM - TECH PARK, GACHIBOWLI VILLAGE, SERILINGAMPALLY MANDAL, RANGA REDDY DISTRICT, TELANGANA.

SCALE:-1:200

AN

NE

XU

RE

- 5

Page 95: FORM Ienvironmentclearance.nic.in/writereaddata/Online/TOR/21_Feb_2018_160644530Y7EQLA6Q...Form - I (As Per New Notification of Mo.E.F dated 1-12-2009 vide SO 3067 (E)) ... As per

ANNEXURE – 6

PROJECT PROPONENT : Shanta Sriram Construction Pvt. Ltd

PROJECT NAME : Shanta Sriram – Tech Park

LOCATION : Gachibowli Village, Serilingampally

Mandal, Ranga Reddy District, Telangana

SUBJECT : Solid waste generation calculation

CALCULATION:

COMMERCIAL COMPLEX

S. No. Description Number of units Number of persons/unit

Total number of persons

1. Block A 1 2606 2606

2. Block B 1 1116 1116

Total persons 3722

3. Based on solid waste generation rates in the urban areas, it is estimated per person

0.2 kg

4. Total persons 3722

5. Total waste generation in kg 744

6. Organic waste in kg (55%) 409

7. In-organic waste in kg (45%) 335

S.No. Waste Disposal Details

1. Organic waste Organic wastes will be disposed to local municipal authorities

2. Inorganic waste Inorganic wastes will be disposed to authorize vendors for recycling

Page 96: FORM Ienvironmentclearance.nic.in/writereaddata/Online/TOR/21_Feb_2018_160644530Y7EQLA6Q...Form - I (As Per New Notification of Mo.E.F dated 1-12-2009 vide SO 3067 (E)) ... As per

ANNEXURE – 7

PROJECT PROPONENT : Shanta Sriram Construction Pvt. Ltd

PROJECT NAME : Shanta Sriram – Tech Park

LOCATION : Gachibowli Village, Serilingampally

Mandal, Ranga Reddy District, Telangana

SUBJECT : Water and wastewater balance

A. SOURCE OF WATER : Hyderabad Metropolitan Water Supply &

Sewerage Board (HMWS&SB)/Water tankers B. WATER REQUIREMENT

S.No Description Total no of persons

Drinking (lpd)

Flushing (lpd)

Drinking (klpd)

Flushing (klpd)

Total (klpd)

1. Block – A 2606 5 45 13.03 117.27 130.30

2. Block – B 1116 5 45 5.58 50.22 55.80

3. Visitors (10% Block – A & B)

373 5 45 1.87 16.79 18.66

Sub Total 4095 - - 20.48 184.28 204.76

Total water requirement 205 klpd (Approx.)

WASTEWATER GENERATION

S.No Item Details

1. Total water requirement klpd 205

2. Wastewater generation (75% Domestic and Flushing) (0.75*205 =153.75)

klpd 154

3. Design STP Capacity klpd 175

4. Treated wastewater (75% wastewater generation) (0.75*154 = 115)

klpd 115

TREATED WASTEWATER USAGE

The treated wastewater will be disposed to the existing sewer line.

FRESH WATER REQUIREMENT

The fresh water requirement is estimated at 205 klpd

Note: klpd – kilo litres per day lpd – litres per day

Page 97: FORM Ienvironmentclearance.nic.in/writereaddata/Online/TOR/21_Feb_2018_160644530Y7EQLA6Q...Form - I (As Per New Notification of Mo.E.F dated 1-12-2009 vide SO 3067 (E)) ... As per

ANNEXURE – 8

PROJECT PROPONENT : Shanta Sriram Construction Pvt. Ltd

PROJECT NAME : Shanta Sriram – Tech Park

LOCATION : Gachibowli Village, Serilingampally

Mandal, Ranga Reddy District, Telangana

SUBJECT : Power Requirement

S.No Item Details

1. Source of electricity Telangana Southern Power Distribution Company Limited (TSSPDCL)

2. TSSPDCL kVA Construction phase Operation phase

- 3400

3. DG sets for power backup

kVA - 2500

4. Fuel requirement Litres per hour

- 444.77

5. DG sets Number - 2x1250

Page 98: FORM Ienvironmentclearance.nic.in/writereaddata/Online/TOR/21_Feb_2018_160644530Y7EQLA6Q...Form - I (As Per New Notification of Mo.E.F dated 1-12-2009 vide SO 3067 (E)) ... As per

FORM – IA

For

“SHANTA SRIRAM – TECH PARK” (Commercial complex)

At Gachibowli Village, Serilingampally Mandal,

Ranga Reddy District, Telangana

MAY – 2017

PROJECT PROPONENT ENVIRONMENT CONSULTANT

SHANTA SRIRAM CONSTRUCTIONS PVT. LTD., Hyderabad, Telangana.

B.S. ENVI-TECH PVT. LTD., Secunderabad, Telangana. NABET Accreditation: NABET/EIA/1316/RA002

Page 99: FORM Ienvironmentclearance.nic.in/writereaddata/Online/TOR/21_Feb_2018_160644530Y7EQLA6Q...Form - I (As Per New Notification of Mo.E.F dated 1-12-2009 vide SO 3067 (E)) ... As per

2

APPENDIX II

(See paragraph 6)

FORM-1 A

(Only for construction projects listed under item 8 of the Schedule) CHECK LIST OF ENVIRONMENTAL IMPACTS (Project proponents are required to provide full information and wherever necessary attach explanatory notes with the Form and submit along with proposed environmental management plan & monitoring programme)

1. LAND ENVIRONMENT

1.0 (Attach panoramic view of the

project site and the vicinity)

Site photographs are enclosed in

Annexure - A1

1.1. Will the existing landuse get

significantly altered from the project

that is not consistent with the

surroundings? (Proposed landuse

must conform to the approved

Master Plan / Development Plan of

the area. Change of landuse if any

and the statutory approval from the

competent authority are submitted).

Background

SSCPL constructed a commercial

complex titled “Shanta Sriram - Tech Park” to accommodated on a plot area of 2.07 Acres.

It is a violation case. A court case

was filed by Telangana Pollution

Control Board in the year 2016.

The judgement was declared on

31.08.2016 with a penalty.

The project did not obtain

Environmental Clearance from

SEIAA, Telangana. However it had

constructed the commercial

complex in the year 2016.

The details are furnished in

Annexure – A2.

Page 100: FORM Ienvironmentclearance.nic.in/writereaddata/Online/TOR/21_Feb_2018_160644530Y7EQLA6Q...Form - I (As Per New Notification of Mo.E.F dated 1-12-2009 vide SO 3067 (E)) ... As per

3

Attach Maps of

(i) Site location,

(ii) Surrounding features of

the proposed site (within

500 meters) and

(iii) The site (indicating levels &

contours) to appropriate

scales.

If not available attach only

conceptual plans.

Plot Area : 8395.94 Sq.m

Built-up Area : 52367.98 Sq.m

Building Height : 30 m

IT office and Services

Block A and Block B with (Three

Basements + Ground Floor –

Seven Floors)

Parking details

Parking Area : 18810.00 Sq.m

Two Wheeler : 225 Nos.

Four Wheeler : 570 Nos.

The various facilities of the

Commercial complex are given in

Annexure – A3.

As per GHMC master plan, the

survey numbers are designated

for commercial use. The copy of

the letter from GHMC is given in

Annexure – A4.

The Master plan of project is given

in Annexure – A5.

Maps for the project site

Annexures

Location Map Annexure A6

10km radius map

Annexure A7

500m Key map Annexure A8

Google Earth Imagery

Annexure A9

1.2. List out all the major project

requirements in terms of the land

area, built up area, water

consumption, power requirement,

connectivity, community facilities,

The salient features of the

completed project are given in

Annexure – A10.

Page 101: FORM Ienvironmentclearance.nic.in/writereaddata/Online/TOR/21_Feb_2018_160644530Y7EQLA6Q...Form - I (As Per New Notification of Mo.E.F dated 1-12-2009 vide SO 3067 (E)) ... As per

4

parking needs etc.

1.3. What are the likely impacts of the

proposed activity on the existing

facilities adjacent to the proposed

site? (Such as open spaces,

community facilities, details of the

existing landuse, disturbance to the

local ecology).

The site and surrounding areas

are earmarked as commercial

development as per the master

plan of GHMC

1.4. Will there be any significant land

disturbance resulting in erosion,

subsidence & instability?

(Details of soil type, slope analysis,

vulnerability to subsidence,

seismicity etc may be given).

Not Applicable.

1.5. Will the proposal involve alteration

of natural drainage systems? (Give

details on a contour map showing

the natural drainage near the

proposed project site)

A proper storm water

management has been

implemented.

1.6. What are the quantities of

earthwork involved in the

construction activity-cutting, filling,

reclamation etc. (Give details of the

quantities of earthwork involved,

transport of fill materials from

outside the site etc)

Not Applicable.

1.7. Give details regarding water supply,

waste handling etc during the

construction period.

Not Applicable.

1.8. Will the low-lying areas & wetlands

get altered? (Provide details of how

low lying and wetlands are getting

modified from the proposed activity)

None.

1.9. Whether construction debris &

waste during construction cause

health hazard? (Give quantities of

various types of wastes generated

during construction including the

construction labour and the means

of disposal)

Not Applicable.

Page 102: FORM Ienvironmentclearance.nic.in/writereaddata/Online/TOR/21_Feb_2018_160644530Y7EQLA6Q...Form - I (As Per New Notification of Mo.E.F dated 1-12-2009 vide SO 3067 (E)) ... As per

5

2. WATER ENVIRONMENT

2.1. Give the total quantity of water

requirement for the proposed

project with the breakup of

requirements for various uses. How

will the water requirement met?

State the sources & quantities and

furnish a water balance statement.

Total water requirement of the

project is estimated as 205 klpd.

Details of the water and

wastewater balance are given in

Annexure – A11.

2.2. What is the capacity (dependable

flow or yield) of the proposed source

of water?

The source of water will be through

HMWS&SB/Private tankers.

2.3. What is the quality of water

required, in case, the supply is not

from a municipal source? (Provide

physical, chemical, biological

characteristics with class of water

quality)

Not Applicable.

2.4. How much of the water

requirement can be met from the

recycling of treated wastewater?

(Give the details of quantities,

sources and usage)

A STP of 175 kld capacity is

provided. Treated wastewater of

115 klpd is disposed to existing

sewer line

Please refer Annexure – A11.

2.5. Will there be diversion of water

from other users? (Please assess

the impacts of the project on other

existing uses and quantities of

consumption)

No

2.6. What is the incremental pollution

load from wastewater generated

from the proposed activity? (Give

details of the quantities and

composition of wastewater

generated from the proposed

activity)

The wastewater generated will be

treated in a Sewage Treatment

Plant (STP) within project premises

and will be disposed to the existing

sewer line

2.7. Give details of the water

requirements met from water

harvesting? Furnish details of the

facilities created.

The roof rain water will be

collected from the terrace of the

building and discharge to the

existing storm water drain.

Page 103: FORM Ienvironmentclearance.nic.in/writereaddata/Online/TOR/21_Feb_2018_160644530Y7EQLA6Q...Form - I (As Per New Notification of Mo.E.F dated 1-12-2009 vide SO 3067 (E)) ... As per

6

2.8. What would be the impact of the

land use changes occurring due to

the proposed project on the runoff

characteristics (quantitative as well

as qualitative) of the area in the

post construction phase on a long-

term basis? Would it aggravate the

problems of flooding or water

logging in any way?

A well design storm water

management has been

constructed.

2.9. What are the impacts of the

proposal on the ground water? (Will

there be tapping of ground water;

give the details of ground water

table, recharging capacity, and

approvals obtained from competent

authority, if any)

Nil.

2.10. What precautions/measures are

taken to prevent the run-off from

construction activities polluting

land & aquifers? (Give details of

quantities and the measures taken

to avoid the adverse impacts)

Not Applicable, since the

construction is completed.

2.11. How is the storm water from within

the site managed?(State the

provisions made to avoid flooding of

the area, details of the drainage

facilities provided along with a site

layout indication contour levels)

Roof water from the respective

buildings shall be collected

through rain water down take

pipes and disposed to storm water

drain.

2.12. Will the deployment of construction

labourers particularly in the peak

period lead to unsanitary

conditions around the project site

(Justify with proper explanation)

Not Applicable.

2.13. What on-site facilities are provided

for the collection, treatment & safe

disposal of sewage? (Give details of

the quantities of wastewater

generation, treatment capacities

The wastewater generated during

the operation phase will be treated

by 175 kld capacity of STP based

on Sequential Batch Reactor

process.

Page 104: FORM Ienvironmentclearance.nic.in/writereaddata/Online/TOR/21_Feb_2018_160644530Y7EQLA6Q...Form - I (As Per New Notification of Mo.E.F dated 1-12-2009 vide SO 3067 (E)) ... As per

7

with technology & facilities for

recycling and disposal).

2.14. Give details of dual plumbing

system if treated waste is used for

flushing of toilets of toilets or any

other use.

Not Applicable.

3. VEGETATION

3.1. Is there any threat of the project to

the biodiversity? (Give a description

of the local ecosystem with it’s unique features, if any)

No.

3.2. Will the construction involve

extensive clearing or modification of

vegetation? (Provide a detailed

account of the trees & vegetation

affected by the project)

Not Applicable, since the

construction was completed.

3.3.

What are the measures proposed to

be taken to minimize the likely

impacts on important site features

(Give details of proposal for tree

plantation, landscaping, creation of

water bodies etc along with a layout

plan to an appropriate scale)

Not Applicable, since the

construction was completed.

4. FAUNA

4.1. Is there likely to be any

displacement of fauna- both

terrestrial and aquatic or creation of

barriers for their movement? Provide

the details.

No.

4.2. Any direct or indirect impacts on the

avifauna of the area? Provide

details.

Not Applicable.

4.3. Prescribe measures such as

corridors, fish ladders etc to

mitigate adverse impacts on fauna

Not Applicable.

Page 105: FORM Ienvironmentclearance.nic.in/writereaddata/Online/TOR/21_Feb_2018_160644530Y7EQLA6Q...Form - I (As Per New Notification of Mo.E.F dated 1-12-2009 vide SO 3067 (E)) ... As per

8

5. AIR ENVIRONMENT

5.1. Will the project increase

atmospheric concentration of gases

& result in heat islands? (Give

details of background air quality

levels with predicted values based

on dispersion models taking into

account the increased traffic

generation as a result of the

proposed constructions)

Diesel Generator (DG) sets of

2x1250 kVA will be provided for

the emergency standby power. The

DG set operation is to meet

emergency power requirements.

Hence there will be no significant

impact on air quality. Since the

usage of DG sets is for temporary

period only.

5.2. What are the impacts on generation

of dust, smoke, odorous fumes or

other hazardous gases? Give details

in relation to all the meteorological

parameters.

Not applicable. Since the

Commercial complex will have

paved roads. This will minimize

the generation of fugitive dust.

5.3. Will the proposal create shortage of

parking space for vehicles? Furnish

details of the present level of

transport infrastructure and

measures proposed for improvement

including the traffic management at

the entry & exit to the project site.

Sufficient parking slots are

provided

Commercial complex

NO.OF SLOTS

Cars 570

2 Wheelers 225

Parking Area : 18810.00 Sq.m

5.4. Provide details of the movement

patterns with internal roads, bicycle

tracks, pedestrian pathways,

footpaths etc., with areas under

each category.

The project will have internal

roads of 8m width to ensure free

flow of traffic.

5.5. Will there be significant increase in

traffic noise & vibrations? Give

details of the sources and the

measures proposed for mitigation of

the above.

Not Applicable.

5.6. What will be the impact of DG sets

& other equipment on noise levels &

vibration in & ambient air quality

around the project site? Provide

details.

DG (Diesel Generator) set will be

used as backup power option.

They will comply with Central

Pollution Control Board (CPCB)

guidelines for emission & noise

control.

Page 106: FORM Ienvironmentclearance.nic.in/writereaddata/Online/TOR/21_Feb_2018_160644530Y7EQLA6Q...Form - I (As Per New Notification of Mo.E.F dated 1-12-2009 vide SO 3067 (E)) ... As per

9

6. AESTHETICS

6.1. Will the proposed constructions in

any way result in the obstruction

of a view, scenic amenity or

landscapes? Are these

considerations taken into account

by the proponents?

No provision for greenbelt

development has been made.

6.2. Will there be any adverse impacts

from new constructions on the

existing structures? What are the

considerations taken into

account?

No.

6.3. Whether there are any local

considerations of urban form &

urban design influencing the

design criteria? They may be

explicitly spelt out.

No.

6.4. Are there any anthropological or

archaeological sites or artifacts

nearby? State if any other

significant features in the vicinity

of the proposed site have been

considered.

Golconda Fort is at a distance of

8.50 km – SSE

7. SOCIO-ECONOMIC ASPECTS

7.1. Will the proposal result in any

changes to the demographic

structure of local population?

Provide the details.

No.

7.2. Give details of the existing social

infrastructure around the

proposed project.

The area is having a number of IT

parks, Engineering colleges and

other commercial apartment

complexes in the vicinity.

7.3. Will the project cause adverse

effects on local communities,

disturbance to sacred sites or

other cultural values? What are

the safeguards proposed?

No.

Page 107: FORM Ienvironmentclearance.nic.in/writereaddata/Online/TOR/21_Feb_2018_160644530Y7EQLA6Q...Form - I (As Per New Notification of Mo.E.F dated 1-12-2009 vide SO 3067 (E)) ... As per

10

8. BUILDING MATERIALS

8.1. May involve the use of building

materials with high-embodied

energy. Are the construction

materials produced with energy

efficient processes? (Give details of

energy conservation measures in

the selection of building materials

and their energy efficiency)

Common area lighting are

provided to work on high energy

efficient lamps (CFL) which results

in saving general consumption.

8.2. Transport and handling of

materials during construction

may result in pollution, noise &

public nuisance. What measures

are taken to minimize the

impacts?

Not Applicable. Construction of

commercial complex was already

completed.

8.3. Are recycled materials used in

roads and structures? State the

extent of savings achieved?

Not Applicable.

8.4. Give details of the methods of

collection, segregation & disposal

of the garbage generated during

the operation phases of the

project.

The solid wastes generated during

operation phase will consist of

mainly paper, cartons, thermocol,

plastics, polythene bags, glass,

waste vegetables and foods etc,.

The inorganic wastes will be

disposed to authorize vendors for

recycling and the organic wastes

will be disposed to local municipal

authorities.

9. ENERGY CONSERVATION

9.1 Give details of the power

requirements, source of supply,

backup source etc. What is the

energy consumption assumed per

square foot of built-up area? How

have you tried to minimize energy

consumption?

Power requirement: The estimated

power requirement is 3400 kVA

The details of power requirement are

furnished in the Annexure – A12.

9.2 What type of, and capacity of,

power back-up to you plan to

The emergency power supply is

through DG Sets.

Page 108: FORM Ienvironmentclearance.nic.in/writereaddata/Online/TOR/21_Feb_2018_160644530Y7EQLA6Q...Form - I (As Per New Notification of Mo.E.F dated 1-12-2009 vide SO 3067 (E)) ... As per

11

provide? Please refer Annexure – A12.

9.3 What are the characteristics of

the glass you plan to use?

Provide specifications of its

characteristics related to both

short wave and long wave

radiation?

Not Applicable.

9.4 What passive solar architectural

features are being used in the

building? Illustrate the

applications made in the

proposed project.

Not Applicable.

9.5 Does the layout of streets &

buildings maximize the potential

for solar energy devices? Have

you considered the use of street

lighting, emergency lighting and

solar hot water systems for use in

the building complex?

Not Applicable.

9.6 Is shading effectively used to

reduce cooling/heating loads?

What principles have been used

to maximize the shading of Walls

on the East and the West and the

Roof? How much energy saving

has been effected?

Not Applicable.

9.7 Do the structures use energy-

efficient space conditioning,

lighting and mechanical systems?

Provide technical details. Provide

details of the transformers and

motor efficiencies, lighting

intensity and air-conditioning

load assumptions? Are you using

CFC and HCFC free chillers?

Provide specifications.

The energy savings will be done by

providing common lighting, CFL and

Lifts.

9.8 What are the likely effects of the

building activity in altering the

micro-climates? Provide a self-

assessment on the likely impacts

No.

Page 109: FORM Ienvironmentclearance.nic.in/writereaddata/Online/TOR/21_Feb_2018_160644530Y7EQLA6Q...Form - I (As Per New Notification of Mo.E.F dated 1-12-2009 vide SO 3067 (E)) ... As per

12

of the proposed construction on

creation of heat island &

inversion effects?

9.9 What are the thermal

characteristics of the building

envelope? (a) roof; (b) external

walls; and (c) fenestration? Give

details of the material used and

the U-values or the R-values of

the individual components.

Not Applicable.

9.10 What precautions & safety

measures are proposed against

fire hazards? Furnish details of

emergency plans.

Fire Extinguishers

Hose reel system

Wet riser

Automatic detection system

Automatic Sprinkler system

Yard Hydrant system

Manual Call point

(Fire Alarm systems)

Underground static water tank

Terrace tank

The project received NOC from Fire

Department.

9.11 If you are using glass as wall

material, provide details and

specifications including

emissivity and thermal

characteristics.

Not Applicable.

9.12 What is the rate of air infiltration

into the building? Provide details

of how you are mitigating the

effects of infiltration.

The rate of air filtration into the building is 5% as it is not 100% air tight building.

9.13 To what extent the non-

conventional energy technologies

are utilised in the overall energy

consumption? Provide details of

the renewable energy

technologies used.

Nil.

Page 110: FORM Ienvironmentclearance.nic.in/writereaddata/Online/TOR/21_Feb_2018_160644530Y7EQLA6Q...Form - I (As Per New Notification of Mo.E.F dated 1-12-2009 vide SO 3067 (E)) ... As per

PROJECT PROPONENT : Shanta Sriram Construction Pvt. Ltd

PROJECT NAME : Shanta Sriram – Tech Park

LOCATION : Gachibowli Village, Serilingampally

Mandal, Ranga Reddy District, Telangana

SUBJECT : Form 1A

LIST OF ANNEXURES

S. No. ANNEXURES DESCRIPTION

1. Annexure – A1 Photographs of the site

2. Annexure – A2 Chronology of the project

3. Annexure – A3 Various facilities of the Tech Park

4. Annexure – A4 Copy of GHMC letter

5. Annexure – A5 Master plan of the project

6. Annexure – A6 Location Map

7. Annexure – A7 10 km Radius Map (Toposheet)

8. Annexure – A8 500 m Radius Map (Google Map)

9. Annexure – A9 Google Earth Imagery

10. Annexure – A10 Salient feature of the project

11. Annexure – A11 Water and wastewater balance

12. Annexure – A12 Power requirement

Page 111: FORM Ienvironmentclearance.nic.in/writereaddata/Online/TOR/21_Feb_2018_160644530Y7EQLA6Q...Form - I (As Per New Notification of Mo.E.F dated 1-12-2009 vide SO 3067 (E)) ... As per

ANNEXURE – A1

PHOTOGRAPHS SHOWING THE PROJECT

Page 112: FORM Ienvironmentclearance.nic.in/writereaddata/Online/TOR/21_Feb_2018_160644530Y7EQLA6Q...Form - I (As Per New Notification of Mo.E.F dated 1-12-2009 vide SO 3067 (E)) ... As per

ANNEXURE – A2

PROJECT PROPONENT : Shanta Sriram Construction Pvt. Ltd

PROJECT NAME : Shanta Sriram – Tech Park

LOCATION : Gachibowli Village, Serilingampally

Mandal, Ranga Reddy District, Telangana

SUBJECT : Chronology of the project

COMMERCIAL COMPLEX SHANTA SRIRAM – TECH PARK

S.No. Description Status

1. Date of Land Acquisition 2005

2. Date of Application to GHMC for plan

approval (Old)

2008

3. Date of Application to GHMC for plan

approval (Revised)

2013

4. Permit No. (Old - 2008) G/104/BP/WZ/447/08

5. Date of GHMC plan Approval (Old

2008)

23.09.2008

6. Application No. (Revised 2013) 62846/24/07/2013/HO

7. Permit No. (Revised 2013) 40076/HO/WZ/Cir-11/2015

8. Date of GHMC plan Approval 13.03.2015

9. Date of start of construction 2005

10. Date of completion of construction 2016

11. Application to SEIAA, AP 27.07.2013

12. Letter vide No. SEIAA/AP/RRD-2013-3786

13. SEIAA, Andhra Pradesh letter dated 25.09.2013

14. Court case filed by Department of

Environment

May 2016

15. Name of the court IV AJCJ – CUM – XXV

Metropolitan Magistrate,

Cyberabad, Kukatpally,

Miyapur

16. Court Case No. 1082/2016

17. Status of the court case Court case was cleared on

31.08.2016

18. Court order Penalty of Rs. 30,000/- was

paid by the project proponent

Page 113: FORM Ienvironmentclearance.nic.in/writereaddata/Online/TOR/21_Feb_2018_160644530Y7EQLA6Q...Form - I (As Per New Notification of Mo.E.F dated 1-12-2009 vide SO 3067 (E)) ... As per

ANNEXURE – A3

PROJECT PROPONENT : Shanta Sriram Construction Pvt. Ltd

PROJECT NAME : Shanta Sriram – Tech Park

LOCATION : Gachibowli Village, Serilingampally

Mandal, Ranga Reddy District, Telangana

SUBJECT : Facilities of the project

COMMERCIAL COMPLEX SHANTA SRIRAM – TECH PARK

A. FACILITIES OF THE PROJECT

S.No Description Height of the Building (m)

1. IT Office 30

B. LAND USE BREAK-UP

S.No Description Area (Sq.m) Area (Acres) Percentage (%)

1. Ground coverage 3499.92 0.86 41.69

2. Internal road 3768.09 0.94 44.87

3. Open Space Reserves (OSR)

813.00 0.20 9.68

4. Area left for road widening

314.93 0.07 3.76

5. Total 8395.94 2.07 100.00

C. BUILT-UP AREA

S.No Description Block A & B (Sq.m)

1. Basement – 1 6200.00

2. Basement – 2 6270.00

3. Basement – 3 6340.00

4. Ground Floor 3679.58

5. First Floor 3828.98

6. Second Floor 4341.57

7. Third Floor 4341.57

8. Fourth Floor 4341.57

9. Fifth Floor 4341.57

10. Sixth Floor 4341.57

11. Seventh Floor 4341.57

Total 52367.98

D. PARKING DETAILS

BLOCK „A‟ & „B‟ S.No Description Two Wheeler Four Wheeler

1. Basement – 1 65 120

2. Basement – 2 80 110

3. Basement – 3 80 115

Total 225 570

Page 114: FORM Ienvironmentclearance.nic.in/writereaddata/Online/TOR/21_Feb_2018_160644530Y7EQLA6Q...Form - I (As Per New Notification of Mo.E.F dated 1-12-2009 vide SO 3067 (E)) ... As per
Page 115: FORM Ienvironmentclearance.nic.in/writereaddata/Online/TOR/21_Feb_2018_160644530Y7EQLA6Q...Form - I (As Per New Notification of Mo.E.F dated 1-12-2009 vide SO 3067 (E)) ... As per
Page 116: FORM Ienvironmentclearance.nic.in/writereaddata/Online/TOR/21_Feb_2018_160644530Y7EQLA6Q...Form - I (As Per New Notification of Mo.E.F dated 1-12-2009 vide SO 3067 (E)) ... As per

PROPOSED EXISTING

DISMENTLE SCALE 1: 100 M

REFERENCESREFERENCES

BUILDERS SIGNATUREENGINEER SIGNATUREARCHITECT SIGNATURE

D.G.P.A. HOLDER SIGNATURE

AREA DETAILS :

LOCATION PLANNOT TO SCALE

DUCT

PROPOSED

BUILDING

PROPOSED

BUILDING

DUCT

19.36 Smt

30' WIDE ROAD30' WIDE ROAD

130.00 smt

30

' W

IDE

RO

AD

180.00 smt

30' WIDE ROAD

OSR

53.00 smt

SIDE OPEN SPACE

SIDE OPEN SPACE

SIDE OPEN SPACESIDE OPEN SPACE

RE

AR

O

PE

N S

PA

CE

FR

ON

T O

PE

N S

PA

CE

EF

F.

UN

DE

R R

OA

D W

IDE

NIN

G A

RE

A :

31

4.9

3 S

mt

450.00 smt

15.00 [49'-2 1/2"]

14.00 [45'-11"]

8.0411.81

5.6

8

17.23

8.00

8.0

0

8.7

3

8.0

7

11.8

0

3.71

19.44

25.0

8 [

82'-

3 1

/2"]

26.92 [88'-4"]13.23 [43'-5"]

7.51 [24'-7 1/2"]23.35 [76'-7 1/2"]

17.13 [56'-2"]

3.46

14.00 [45'-11"]

19.11 [62'-8 1/2"]

7.48 [24'-6 1/2"]

64.5830.33

8.2

7

27.44

16.65

7.91

15.21

16.49

8.7

5

9.1

1

8.0

4

8.4

7

0.9

0

23.36

2.3

1

31.0

9

10.00

1.9

0

11.17

2.4

5

10.771.56 11.24

1.3

8 5.15

0.5

5

5.74

0.9

8

10.46

0.4

6 5.59

1.3

0 4.65

8.1

25.6

9

9.10

9.69

8.2

0

8.0

0

11.23 [36'-10"]

11.61 [38'-1"]

11.48 [37'-8"]

5.55 [18'-2 1/2"]

4.44 [14'-7"]16.41 [53'-10"]

4.8

5 [1

5'-1

1"]

4.3

7 [

14'-

4"]

2.1

1

13.45 [44'-1 1/2"]

14.6

2 [

47'-

11 1

/2"]

7.6

0 [

24'-

11"]

43.44 [142'-6 1/2"]

25.54 [83'-9 1/2"]

8.06 [26'-5"] 5.64 [18'-6"] 4.62 [15'-2"]10.01 [32'-10"]

7.91 [25'-11 1/2"]7.86 [25'-9 1/2"]

8.07 [26'-5 1/2"]7.78 [25'-6 1/2"] 7.82 [25'-8"]

7.75 [25'-5"]7.83 [25'-8 1/2"]

8.43 [27'-8"]

9.02 [29'-7"]7.04 [23'-1"]

9.08 [29'-9 1/2"]7.63 [25'-0 1/2"]

7.48 [24'-6 1/2"]6.62 [21'-8 1/2"]2.347.50 [24'-7"]2.782.742.730.73

7.63 [25'-0 1/2"]7.77 [25'-5 1/2"]7.80 [25'-7"]4.78 [15'-8"]3.047.83 [25'-8 1/2"]

7.67 [25'-2"]7.84 [25'-8 1/2"]2.945.68 [18'-7 1/2"]8.46 [27'-9"]10.05 [32'-11 1/2"]10.50 [34'-5 1/2"]

11.04 [36'-2 1/2"]

0.7

5

6.68 0.90

6.89

8.0

0

8.00

8.0

3

2.533.20

4.88

1.98 [6'-6"]

1.9

0

12.10

SITE PLAN

PLAN OF EXISTING OFFICE BUILDING SHANTA SRIRAM - TECH PARK

IN SURVEY NO : 126,

SITUATED AT GACHIBOWLI VILLAGE,

SERILINGAMPALLY MANDAL,

RANGA REDDY (DIST)., TELANGANA.

NORTH

9.70

GACHIBOWLI

STADIUM

TO SHAMSHABAD EXPRESS

WAY ROAD

GACHIBOWLI 'X' ROADS

TO ISB & MICRO SOFT ROAD

BO

TA

NIC

AL

GA

RD

EN

DL

F C

YB

ER

CIT

Y

ROAD

IIIT

CA

MP

US

TO

H

YD

ER

AB

AD

C

EN

TR

AL

UN

IVE

RS

ITY

TCS SYNERGY PARK

OP

EN

PL

OT

SITE

ROAD

TO KONDAPUR ROAD

RO

AD

TO

TO

LIC

HO

WK

I

OPEN PLOT

OSR

OSR

OSR

S.No Description Area (Sq.m) Area (Acres) Percentage (%)1. Ground coverage 3499.92 0.86 41.69

2. Internal road 3768.09 0.94 44.87

3. Open Space Reserves (OSR)

813.00 0.20 9.68

4. Area left for road widening

314.93 0.07 3.76

5. Total 8395.94 2.07 100.00

S.No Description Block A & B (Sq.m)

1. Basement 1 6200.00

2. Basement 2 6270.00

3. Basement 3 6340.00

4. Ground Floor 3679.58

5. First Floor 3828.98

6. Second Floor 4341.57

7. Third Floor 4341.57

8. Fourth Floor 4341.57

9. Fifth Floor 4341.57

10. Sixth Floor 4341.57

11. Seventh Floor 4341.57

Total 52367.98

BLOCK 'A' & 'B'

S.No Description Two Wheeler Four Wheeler

1. Basement 1 65 120

2. Basement 2 80 110

3. Basement 3 80 115

Total 225 570

PARKING DETAILS

BUILT-UP AREA

LAND USE BREAK-UP

PROJECT DEVELOPER

SHANTA SRIRAM CONSTRUCTIONS PVT. LTD

501, Oasis Centre, Somajiguda,

Begumpet Main Road, Opp. Pullareddy Sweets,

PLAN OF SHANTA SRIRAM - TECH PARK, GACHIBOWLI VILLAGE, SERILINGAMPALLY MANDAL, RANGA REDDY DISTRICT, TELANGANA.

SCALE:-1:200

AN

NE

XU

RE

- A5

Page 117: FORM Ienvironmentclearance.nic.in/writereaddata/Online/TOR/21_Feb_2018_160644530Y7EQLA6Q...Form - I (As Per New Notification of Mo.E.F dated 1-12-2009 vide SO 3067 (E)) ... As per

LOCATION MAP

INDIA

Wa ra n ga l

TELANGANA

Na lgon da

Kh a m m a m

Adila ba d

Ka rim n a ga rNiza m ba d

Me da k

Ra n ga re dd i

Ma h a bu bn a ga r

LEGEND

RAILWAY TRACK

RIVER

ROAD

DIS TRICT BOUNDARY

S TATE HIGHWAY

TALUK HEADQUARTER

DIS TRICT HEADQUARTER

TOWN

S TREAMS

NATIONAL HIGHWAY

PROJECT S ITERANGA REDDY DISTRICT

Ve n ka ta pu ra m

Ma ilwa rra m

Mirya n

Tandur

S h a h a ba dPargi

Ma rka lNa n ch e rla

Mu h a m m a da ba d

Dom a

Mora n gpa lli

Pe dda m a l

Ela l

Kote pa lli

Pa t lu r

Ma rpa lli

Ch a n gom a l

Chevella

S h a n ka rpa lli

Vikarabad

Ibrahimpatanam

Ya ch a ra m

Ma is a ra m

Bola ra mMa u la Ali

Medchal

HYDERABAD

Tu kku gu da

S e cu n de ra ba dGu n d ipe t

Golkon da

7

7

9

7& 9

Hu s a inS a ga r

PROJECT SITE

ANNEXURE - A6

N

Note : - Not to s ca le

Page 118: FORM Ienvironmentclearance.nic.in/writereaddata/Online/TOR/21_Feb_2018_160644530Y7EQLA6Q...Form - I (As Per New Notification of Mo.E.F dated 1-12-2009 vide SO 3067 (E)) ... As per

N

Kazipet Jn.134.5 km

To

25.7 km

To

Sangareddi

Hyderabad8.7 km

To

Wadi153.0 km

To

Bolarum9.1 km

To

PROJECT SITE PREPARED BY

S ECUNDERABAD

SHOWING 10 km RADIUS

TOPOGRAPHICAL MAP

AN

NE

XU

RE

- A7

M/s. SHANTA SRIRAM CONSTRUCTIONS PVT. LTD., CLIENT :

TITLE :

Ga ch ibowli Villa ge , S e rilin ga m pa lly Ma n da l, Ra n ga Re ddy Dis t r ict , Te la n ga n a .

PROJECT :

PROJECT S ITE

S CALE

3

S u rve y of In d ia Topos h e e t s

5 67

K

5 66

K

5 68

K

5 63

K

5 62

K

5 64

K

5 61 0

K

5 61 1

K

5 61 2

K

In de x to

0 6 km

REFER TO THIS MAP AS : - 1 : 5 0 ,0 0 0

Pu b lis h e d u n de r th e d ire ct ion of

S HEET 5 6 K / 7 FIRS T EDITION

th e S u rve yor Ge n e ra l of In d ia - 2 0 1 2

LEGEND

Page 119: FORM Ienvironmentclearance.nic.in/writereaddata/Online/TOR/21_Feb_2018_160644530Y7EQLA6Q...Form - I (As Per New Notification of Mo.E.F dated 1-12-2009 vide SO 3067 (E)) ... As per

AN

NE

XU

RE

- A8

500 m GOOGLE MAP FOR THE PROJECT

Page 120: FORM Ienvironmentclearance.nic.in/writereaddata/Online/TOR/21_Feb_2018_160644530Y7EQLA6Q...Form - I (As Per New Notification of Mo.E.F dated 1-12-2009 vide SO 3067 (E)) ... As per

PROJECT SITE

GOOGLE EARTH IMAGERY FOR THE PROJECT SITEA

NN

EX

UR

E - A

9

Page 121: FORM Ienvironmentclearance.nic.in/writereaddata/Online/TOR/21_Feb_2018_160644530Y7EQLA6Q...Form - I (As Per New Notification of Mo.E.F dated 1-12-2009 vide SO 3067 (E)) ... As per

ANNEXURE – A10

PROJECT PROPONENT : Shanta Sriram Construction Pvt. Ltd

PROJECT NAME : Shanta Sriram – Tech Park

LOCATION : Gachibowli Village, Serilingampally

Mandal, Ranga Reddy District, Telangana

SUBJECT : Salient features of the project

A. LAND REQUIREMENT

S.No Description Details

1. The area of the project will be 2.07 Acres

2. Total plot area Sq.m 8395.94

3. Built-up area Sq.m 52367.98

4. Parking area Sq.m 18810.00

5. Two wheeler Nos. 225

6. Four wheeler Nos. 570

B. FACILITIES OF THE BUILDING

S. No. Description Height of the Building (m)

1. 1. IT building 30

C. WATER REQUIREMENT

S.No Item Details

7. Source of water: Hyderabad Metropolitan Water Supply & Sewerage Board (HMWS&SB)/Private tankers

8. Operation phase klpd 205

9. Fresh water klpd 205

10. Wastewater generation klpd 154

11. STP Capacity klpd 175

12. Treated wastewater klpd 115

S.No Item Details

13. Source of electricity Telangana Southern Power Distribution Company Limited (TSSPDCL)

14. TSSPDCL kVA Operation phase

3400

15. DG sets for power backup

kVA 2500

16. Fuel requirement Litres per hour

444.77

17. DG sets Number 2 x 1250

Page 122: FORM Ienvironmentclearance.nic.in/writereaddata/Online/TOR/21_Feb_2018_160644530Y7EQLA6Q...Form - I (As Per New Notification of Mo.E.F dated 1-12-2009 vide SO 3067 (E)) ... As per

D. SOLID WASTE GENERATION

COMMERCIAL COMPLEX

S. No. Description Number of units

Number of persons/unit

Total number of persons

1. Block A 1 2606 2606

2. Block B 1 1116 1116

Total persons 3722

S.No Description IT Offices

1. Based on solid waste generation rates in the urban areas, it is estimated per person

0.2 kg

2. Total persons 3722

3. Total waste generation in kg 744

4. Organic waste in kg (55%) 409

5. In-organic waste in kg (45%) 335

S.No. Waste Disposal Details

1. Organic waste Organic wastes will be disposed to local municipal authorities

2. Inorganic waste Inorganic wastes will be disposed to authorize vendors for recycling

Page 123: FORM Ienvironmentclearance.nic.in/writereaddata/Online/TOR/21_Feb_2018_160644530Y7EQLA6Q...Form - I (As Per New Notification of Mo.E.F dated 1-12-2009 vide SO 3067 (E)) ... As per

ANNEXURE – A11

PROJECT PROPONENT : Shanta Sriram Construction Pvt. Ltd

PROJECT NAME : Shanta Sriram – Tech Park

LOCATION : Gachibowli Village, Serilingampally

Mandal, Ranga Reddy District, Telangana

SUBJECT : Water and wastewater balance

A. SOURCE OF WATER : Hyderabad Metropolitan Water Supply &

Sewerage Board (HMWS&SB)/Water tankers B. WATER REQUIREMENT

S.No Description Total no of persons

Drinking (lpd)

Flushing (lpd)

Drinking (klpd)

Flushing (klpd)

Total (klpd)

1. Block – A 2606 5 45 13.03 117.27 130.30

2. Block – B 1116 5 45 5.58 50.22 55.80

3. Visitors (10% Block – A & B)

373 5 45 1.87 16.79 18.66

Sub Total 4095 - - 20.48 184.28 204.76

Total water requirement 205 klpd (Approx.)

WASTEWATER GENERATION

S.No Item Details

1. Total water requirement klpd 205

2. Wastewater generation (75% Domestic and Flushing) (0.75*205 =153.75)

klpd 154

3. Design STP Capacity klpd 175

4. Treated wastewater (75% wastewater generation) (0.75*154 = 115)

klpd 115

TREATED WASTEWATER USAGE

The treated wastewater will be disposed to the existing sewer line

FRESH WATER REQUIREMENT

The fresh water requirement is estimated at 205 klpd

Note: klpd – kilo litres per day lpd – litres per day

Page 124: FORM Ienvironmentclearance.nic.in/writereaddata/Online/TOR/21_Feb_2018_160644530Y7EQLA6Q...Form - I (As Per New Notification of Mo.E.F dated 1-12-2009 vide SO 3067 (E)) ... As per

ANNEXURE – A12

PROJECT PROPONENT : Shanta Sriram Construction Pvt. Ltd

PROJECT NAME : Shanta Sriram – Tech Park

LOCATION : Gachibowli Village, Serilingampally

Mandal, Ranga Reddy District, Telangana

SUBJECT : Power Requirement

S.No Item Details

1. Source of electricity Telangana Southern Power Distribution Company Limited (TSSPDCL)

2. TSSPDCL kVA Construction phase Operation phase

- 3400

3. DG sets for power backup

kVA - 2500

4. Fuel requirement Litres per hour

- 444.77

5. DG sets Number - 2x1250

Page 125: FORM Ienvironmentclearance.nic.in/writereaddata/Online/TOR/21_Feb_2018_160644530Y7EQLA6Q...Form - I (As Per New Notification of Mo.E.F dated 1-12-2009 vide SO 3067 (E)) ... As per

ENVIRONMENTAL MANAGEMENT PLAN

of

“SHANTA SRIRAM – TECH PARK”

(Commercial Complex)

At Gachibowli Village, Serilingampally Mandal

Ranga Reddy District, Telangana.

MAY – 2017

PROJECT PROPONENT ENVIRONMENT CONSULTANT

SHANTA SRIRAM CONSTRUCTIONS PVT. LTD., Hyderabad, Telangana.

B.S. ENVI-TECH PVT. LTD., Secunderabad, Telangana. NABET Accreditation: NABET/EIA/1316/RA002

Page 126: FORM Ienvironmentclearance.nic.in/writereaddata/Online/TOR/21_Feb_2018_160644530Y7EQLA6Q...Form - I (As Per New Notification of Mo.E.F dated 1-12-2009 vide SO 3067 (E)) ... As per

TABLE OF CONTENTS

Para No. Content Page No.

Chapter -1 : Introduction

1.0 Shanta Sriram Construction Pvt. Ltd SSCPL) 2

1.1 Government of India – Legislation - Building/Construction Projects/Area Development Projects and Townships

2

1.2 Environmental Management Plan 2

1.3 Present status of the project 3

1.4 Applicable Environmental Standards And Regulations

4

1.5 Location of the project 5

1.6 Resource requirement 6

1.6.1 Construction phase 6

1.6.2 Operation phase 6

Chapter – 2 : Environmental Management Plan

2.1 Environmental Management Plan during Operation phase

8

2.1.1 Water Environment 8

2.1.2 Air Environment 9

2.1.3 Noise Environment 10

2.1.4 Storm Water Management 10

2.1.5 Greenbelt development 10

2.1.6 Solid Waste Generation 10

2.1.7 Energy Conservation 11

2.1.8 Fire Fighting devices 11

Page 127: FORM Ienvironmentclearance.nic.in/writereaddata/Online/TOR/21_Feb_2018_160644530Y7EQLA6Q...Form - I (As Per New Notification of Mo.E.F dated 1-12-2009 vide SO 3067 (E)) ... As per

LIST OF TABLES

Table No. Title Page No.

1 Facilities of the project 3

2 Details of Land use Break-up 3

3 Details of Built-up Area 3

4 Details of Parking 4

5 Co-ordinates of the project site 5

6 Sewage Treatment Plant (Design Basis) 9

7 Details of Fire-fighting devices 11

LIST OF FIGURES

Fig. No. Title Page No.

1 Perspective view of the building 4

2 Location map of the project site 5

3 Study area of 10 km radius around the project site 5

4 2 km Radius Map for the project site 5

5 Google Earth Imagery for the project site 5

6 Master plan of the project 8

Page 128: FORM Ienvironmentclearance.nic.in/writereaddata/Online/TOR/21_Feb_2018_160644530Y7EQLA6Q...Form - I (As Per New Notification of Mo.E.F dated 1-12-2009 vide SO 3067 (E)) ... As per

Shanta Sriram – Tech Park Gachibowli Village, Serilingampally Mandal, Ranga Reddy District, Telangana.

EMP Report

Project proponent

Shanta Sriram Construction Pvt. Ltd 2 B.S. Envi-Tech (P) Ltd., Sec’bad.

CHAPTER – 1: INTRODUCTION

1.0 SHANTA SRIRAM CONSTRUCTION PRIVATE LIMITED (SSPCL)

SSPCL constructed a commercial complex titled “SHANTA SRIRAM – TECH PARK” on a plot area of 2.07 Acres (8395.94 Sq.m) at Survey

Nos. 126, Gachibowli Village, Serilingampally Mandal, Ranga Reddy

District, Telangana. This project is a violation case. A court case was

filed by Telangana Pollution Control Board in the year 2016. The

judgement was declared on 31.08.2016 with a penalty.

1.1 GOVERNMENT OF INDIA – LEGISLATION -

BUILDING/CONSTRUCTION PROJECTS/AREA DEVELOPMENT

PROJECTS AND TOWNSHIPS

Government of India, Ministry of Environment, Forests and Climate

Change (MoEF&CC) New Delhi has issued an Environmental Impact

Assessment (EIA) Notification SO 1533, on 14th Sep 2006 and

Amendments thereof. As per the notification, all building/construction

projects/area development projects and townships are identified as

Category ‘B’ project which necessitates obtaining the Environmental

Clearance (EC). The notification has exempted the above

establishment from holding the Public Hearing.

1.2 ENVIRONMENTAL MANAGEMENT PLAN

Towards complying with above statutory requirements of MoEF&CC,

SSCPL proposes to obtain the Environmental clearance for its

completed commercial complex titled “Shanta Sriram – Tech Park”

at Survey No. 126, Gachibowli Village, Serilingampally Mandal, Ranga

Reddy District, Telangana.

Page 129: FORM Ienvironmentclearance.nic.in/writereaddata/Online/TOR/21_Feb_2018_160644530Y7EQLA6Q...Form - I (As Per New Notification of Mo.E.F dated 1-12-2009 vide SO 3067 (E)) ... As per

Shanta Sriram – Tech Park Gachibowli Village, Serilingampally Mandal, Ranga Reddy District, Telangana.

EMP Report

Project proponent

Shanta Sriram Construction Pvt. Ltd 3 B.S. Envi-Tech (P) Ltd., Sec’bad.

1.3 PRESENT STATUS OF THE PROJECT

SSCPL already constructed the commercial complex titled “Shanta

Sriram – Tech Park” at Survey No. 126, Gachibowli Village,

Serilingampally Mandal, Ranga Reddy District, Telangana at an

estimated project cost of Rs. 150 Crores.

Total Plot area of the project is 2.07 Acres with built-up area of

52367.98 Sq.m. The projects have IT office and Services.

TABLE – 1

A. FACILITIES OF THE PROJECT

S. No. Description Height of the Building (m)

1. IT Office 30

TABLE – 2

B. DETAILS OF LAND USE BREAK-UP

S.No Description Area (Sq.m) Area (Acres) Percentage (%)

1. Ground coverage 3499.92 0.86 41.69

2. Internal road 3768.09 0.94 44.87

3. Open Space Reserves (OSR)

813.00 0.20 9.68

4. Area left for road widening

314.93 0.07 3.76

5. Total 8395.94 2.07 100.00

TABLE – 3

C. DETAILS OF BUILT-UP AREA

S.No Description Block A & B (Sq.m)

1. Basement – 1 6200.00

2. Basement – 2 6270.00

3. Basement – 3 6340.00

4. Ground Floor 3679.58

5. First Floor 3828.98

6. Second Floor 4341.57

7. Third Floor 4341.57

8. Fourth Floor 4341.57

9. Fifth Floor 4341.57

10. Sixth Floor 4341.57

11. Seventh Floor 4341.57

Total 52367.98

Page 130: FORM Ienvironmentclearance.nic.in/writereaddata/Online/TOR/21_Feb_2018_160644530Y7EQLA6Q...Form - I (As Per New Notification of Mo.E.F dated 1-12-2009 vide SO 3067 (E)) ... As per

Shanta Sriram – Tech Park Gachibowli Village, Serilingampally Mandal, Ranga Reddy District, Telangana.

EMP Report

Project proponent

Shanta Sriram Construction Pvt. Ltd 4 B.S. Envi-Tech (P) Ltd., Sec’bad.

TABLE – 4

D. DETAILS OF PARKING

BLOCK „A‟ AND BLOCK „B‟ S.No Description Two Wheeler Four Wheeler

1. Basement – 1 65 120

2. Basement – 2 80 110

3. Basement – 3 80 115

Total 225 570

Parking Area: 18810.00 Sq.m

FIG – 1 depicts the perspective view of the Shanta Sriram - Tech Park

1.4 APPLICABLE ENVIRONMENTAL STANDARDS AND REGULATIONS

With respect to prevention and control of environmental pollution, the

project is governed by the following Acts and Rules of MoEF&CC:

Water (Prevention and Control of Pollution) Act, 1974 as amended

in 1978 and 1988;

Air (Prevention and Control of Pollution) Act, 1981 as amended

in 1987;

Environment (Protection) Act, 1986 amended 1991 and

Environment (Protection) rules, 1986 and amendments thereafter;

Hazardous Waste (Management & Handling) Rules, 1989, as

amended in 2000, 2003, 2008, 2011 and 2013.

Municipal Solid Wastes (Management and Handling) Rules, 2000

as amended in 2016.

The Noise Pollution (Regulation and Control) Rules, 2000 and as

amended in 22.11.2000.

Page 131: FORM Ienvironmentclearance.nic.in/writereaddata/Online/TOR/21_Feb_2018_160644530Y7EQLA6Q...Form - I (As Per New Notification of Mo.E.F dated 1-12-2009 vide SO 3067 (E)) ... As per

FIG - 1

PHOTOGRAPHS SHOWING THE PROJECT

Page 132: FORM Ienvironmentclearance.nic.in/writereaddata/Online/TOR/21_Feb_2018_160644530Y7EQLA6Q...Form - I (As Per New Notification of Mo.E.F dated 1-12-2009 vide SO 3067 (E)) ... As per

Shanta Sriram – Tech Park Gachibowli Village, Serilingampally Mandal, Ranga Reddy District, Telangana.

EMP Report

Project proponent

Shanta Sriram Construction Pvt. Ltd 5 B.S. Envi-Tech (P) Ltd., Sec’bad.

1.5 LOCATION OF THE PROJECT

The project site is a part of the Survey of India Toposheet No.

No.56/K/7. The site falls

TABLE – 5

CO-ORDINATES OF THE PROJECT SITE

(A) 17°26'46.47"N - 78°21'19.69"E (H) 17°26'50.04"N - 78°21'13.62"E

(B) 17°26'47.87"N - 78°21'17.13"E (I) 17°26'49.12"N - 78°21'17.68"E

(C) 17°26'49.81"N - 78°21'12.88"E (J) 17°26'48.21"N - 78°21'19.67"E

(D) 17°26'50.28"N - 78°21'12.16"E (K) 17°26'47.85"N - 78°21'20.04"E

(E) 17°26'51.04"N - 78°21'12.65"E (L) 17°26'47.36"N - 78°21'19.79"E

(F) 17°26'50.77"N - 78°21'13.14"E (M) 17°26'47.01"N - 78°21'19.90"E

(G) 17°26'50.46"N - 78°21'13.18"E

The average altitude of project site is 597 m above MSL.

Nearest railway line connecting Kazipet Jn - Wadi of South Central

Railway line is located at a distance of 3.9 km to NNE direction from

the site. Musi River is at a distance of 7.0 km in S direction. Hussain

Sagar is at a distance of 11.6 km in ESE direction.

The National Highway (NH-9) connecting Sangareddi – Hyderabad is

located at a distance of about 5.1 km in N, & The National Highway

(NH-7) connecting Kurnool – Hyderabad is located at a distance of

about 15.0 km in SE Direction, The nearest railway station is located

at Hi Tech City RS which is 4.1 km in NE direction.

FIG – 2 LOCATION MAP FOR THE PROJECT SITE

FIG – 3 STUDY AREA OF 10km RADIUS AROUND PROJECT SITE

FIG – 4 2km RADIUS MAP FOR THE PROJECT SITE

FIG – 5 GOOGLE EARTH IMAGERY FOR THE PROJECT SITE

Kasu Brahmananda Reddy National Park is at a distance of 6.8 km in

ESE direction with respect to the project site. Nehru Zoological

Park is at a distance of 14.0 km in SE with respect to the project

site.

Golconda Fort is at a distance of 8.5 km in SSE direction. Qutub

Shahi Tombs is at a distance of 7.0 km in SSE direction. Charminar is

Page 133: FORM Ienvironmentclearance.nic.in/writereaddata/Online/TOR/21_Feb_2018_160644530Y7EQLA6Q...Form - I (As Per New Notification of Mo.E.F dated 1-12-2009 vide SO 3067 (E)) ... As per

LOCATION MAP

INDIA

Wa ra n ga l

TELANGANA

Na lgon da

Kh a m m a m

Adila ba d

Ka rim n a ga rNiza m ba d

Me da k

Ra n ga re dd i

Ma h a bu bn a ga r

LEGEND

RAILWAY TRACK

RIVER

ROAD

DIS TRICT BOUNDARY

S TATE HIGHWAY

TALUK HEADQUARTER

DIS TRICT HEADQUARTER

TOWN

S TREAMS

NATIONAL HIGHWAY

PROJECT S ITERANGA REDDY DISTRICT

Ve n ka ta pu ra m

Ma ilwa rra m

Mirya n

Tandur

S h a h a ba dPargi

Ma rka lNa n ch e rla

Mu h a m m a da ba d

Dom a

Mora n gpa lli

Pe dda m a l

Ela l

Kote pa lli

Pa t lu r

Ma rpa lli

Ch a n gom a l

Chevella

S h a n ka rpa lli

Vikarabad

Ibrahimpatanam

Ya ch a ra m

Ma is a ra m

Bola ra mMa u la Ali

Medchal

HYDERABAD

Tu kku gu da

S e cu n de ra ba dGu n d ipe t

Golkon da

7

7

9

7& 9

Hu s a inS a ga r

PROJECT SITE

N

Note : - Not to s ca le

FIG - 2

Page 134: FORM Ienvironmentclearance.nic.in/writereaddata/Online/TOR/21_Feb_2018_160644530Y7EQLA6Q...Form - I (As Per New Notification of Mo.E.F dated 1-12-2009 vide SO 3067 (E)) ... As per

N

Kazipet Jn.134.5 km

To

25.7 km

To

Sangareddi

Hyderabad8.7 km

To

Wadi153.0 km

To

Bolarum9.1 km

To

PROJECT SITE PREPARED BY

S ECUNDERABAD

SHOWING 10 km RADIUS

TOPOGRAPHICAL MAP

M/s. SHANTA SRIRAM CONSTRUCTIONS PVT. LTD., CLIENT :

TITLE :

Ga ch ibowli Villa ge , S e rilin ga m pa lly Ma n da l, Ra n ga Re ddy Dis t r ict , Te la n ga n a .

PROJECT :

PROJECT S ITE

S CALE

3

S u rve y of In d ia Topos h e e t s

5 67

K

5 66

K

5 68

K

5 63

K

5 62

K

5 64

K

5 61 0

K

5 61 1

K

5 61 2

K

In de x to

0 6 km

REFER TO THIS MAP AS : - 1 : 5 0 ,0 0 0

Pu b lis h e d u n de r th e d ire ct ion of

S HEET 5 6 K / 7 FIRS T EDITION

th e S u rve yor Ge n e ra l of In d ia - 2 0 1 2

LEGEND

FIG - 3

Page 135: FORM Ienvironmentclearance.nic.in/writereaddata/Online/TOR/21_Feb_2018_160644530Y7EQLA6Q...Form - I (As Per New Notification of Mo.E.F dated 1-12-2009 vide SO 3067 (E)) ... As per

N

PREPARED BY

S ECUNDERABAD

SHOWING 2 km RADIUS

TOPOGRAPHICAL MAP

FIG - 4M/s. SHANTA SRIRAM CONSTRUCTIONS PVT. LTD.,

CLIENT :

TITLE :

Ga ch ibowli Villa ge , S e rilin ga m pa lly Ma n da l, Ra n ga Re ddy Dis t r ict , Te la n ga n a .

PROJECT :

PROJECT S ITE

S CALE

1

S u rve y of In d ia Topos h e e t s

5 67

K

5 66

K

5 68

K

5 63

K

5 62

K

5 64

K

5 61 0

K

5 61 1

K

5 61 2

K

In de x to

0 2 km

REFER TO THIS MAP AS : - 1 : 5 0 ,0 0 0

Pu b lis h e d u n de r th e d ire ct ion of

S HEET 5 6 K / 7 FIRS T EDITION

th e S u rve yor Ge n e ra l of In d ia - 2 0 1 2

LEGEND

PROJECT SITE

Page 136: FORM Ienvironmentclearance.nic.in/writereaddata/Online/TOR/21_Feb_2018_160644530Y7EQLA6Q...Form - I (As Per New Notification of Mo.E.F dated 1-12-2009 vide SO 3067 (E)) ... As per

PROJECT SITE

GOOGLE EARTH IMAGERY FOR THE PROJECT SITEF

IG - 5

Page 137: FORM Ienvironmentclearance.nic.in/writereaddata/Online/TOR/21_Feb_2018_160644530Y7EQLA6Q...Form - I (As Per New Notification of Mo.E.F dated 1-12-2009 vide SO 3067 (E)) ... As per

Shanta Sriram – Tech Park Gachibowli Village, Serilingampally Mandal, Ranga Reddy District, Telangana.

EMP Report

Project proponent

Shanta Sriram Construction Pvt. Ltd 6 B.S. Envi-Tech (P) Ltd., Sec’bad.

at a distance of 15.8 km in SE direction. Birla Temple is at a distance

of 12.9 km in ESE direction.

Nearest Settlements from the Project Site

Kottaguda – 1.8 km – NE

Siddiquinagar – 1.0 km – ENE

Gachibauli – 0.7 km – SE

Indiranagar – 0.8 km - S

Nearest Reserve Forests from the Project Site Kottaguda RF is at a

distance of 0.2 km from the site at N direction and Chilkur PF – 9.0

km Southern Direction.

1.6 RESOURCE REQUIREMENT

1.6.1 CONSTRUCTION PHASE

The project has already been constructed

1.6.2 OPERATION PHASE

The following are the major requirements in the operation phase:

A POWER

About 3400 kVA of power will be required for the project and will be

sourced from the TSSPDCL. During periods of power outages, the

emergency power will be supplied through two standby DG sets each

of 1250 kVA.

B WATER SUPPLY

The total water requirement of the project during operation phase is

estimated to be 205 kld.

The fresh water requirement is estimated at 205 kld will be met from

(HMWSSB)/Water tankers.

Page 138: FORM Ienvironmentclearance.nic.in/writereaddata/Online/TOR/21_Feb_2018_160644530Y7EQLA6Q...Form - I (As Per New Notification of Mo.E.F dated 1-12-2009 vide SO 3067 (E)) ... As per

Shanta Sriram – Tech Park Gachibowli Village, Serilingampally Mandal, Ranga Reddy District, Telangana.

EMP Report

Project proponent

Shanta Sriram Construction Pvt. Ltd 7 B.S. Envi-Tech (P) Ltd., Sec’bad.

C SEWAGE TREATMENT PLANT

The estimated wastewater is 154 kld which is treated in STP of 175

kld capacity. 115 kld will be a treated wastewater from the STP. This

treated wastewater from the STP will be disposed to the existing sewer

line.

D MANPOWER

The project will provide direct employment to the about 5 people and

indirect employment for 30 peoples for service providers/facility

management.

Page 139: FORM Ienvironmentclearance.nic.in/writereaddata/Online/TOR/21_Feb_2018_160644530Y7EQLA6Q...Form - I (As Per New Notification of Mo.E.F dated 1-12-2009 vide SO 3067 (E)) ... As per

Shanta Sriram – Tech Park Gachibowli Village, Serilingampally Mandal, Ranga Reddy District, Telangana.

EMP Report

Project proponent

Shanta Sriram Construction Pvt. Ltd 8 B.S. Envi-Tech (P) Ltd., Sec’bad.

CHAPTER – 2: ENVIRONMENTAL MANAGEMENT PLAN

Environmental Management Plan of the project has been formulated

keeping in view of current Environmental guidelines standard for

Building Projects provided by Ministry of Environmental, Forests and

Climate Change (MoEF&CC) and Telangana State Pollution Control

Board (TSPCB).

The following mitigation measures are in order to synchronize the

development of the project with the environmental protection. The

construction phase impacts are mostly short term, restricted to the

plot area and not envisaged on the larger scale. In the operation phase

the environmental impacts are due to operation of the project and

hence, the emphasis in the Environment Management Plan (EMP) is to

minimize such impacts.

FIG – 6 Master plan of the project

Following sections describe the environment management plan for

operation phases.

2.1 ENVIRONMENTAL MANAGEMENT PLAN DURING OPERATION

PHASE

The Environmental Management Plan to be implemented during

operation phase is discussed under the following heads

a. Water Environment

b. Air environment

c. Noise Environment

d. Solid waste generation

Details of management plan of each environmental component are

given below:

2.1.1 WATER ENVIRONMENT

WATER CONSUMPTION AND WASTEWATER GENERATION

Total water consumption in the operation phase is about 205 kld. Of

this, about 154 kld is the wastewater generation from the project.

Page 140: FORM Ienvironmentclearance.nic.in/writereaddata/Online/TOR/21_Feb_2018_160644530Y7EQLA6Q...Form - I (As Per New Notification of Mo.E.F dated 1-12-2009 vide SO 3067 (E)) ... As per

PROPOSED EXISTING

DISMENTLE SCALE 1: 100 M

REFERENCESREFERENCES

BUILDERS SIGNATUREENGINEER SIGNATUREARCHITECT SIGNATURE

D.G.P.A. HOLDER SIGNATURE

AREA DETAILS :

LOCATION PLANNOT TO SCALE

DUCT

PROPOSED

BUILDING

PROPOSED

BUILDING

DUCT

19.36 Smt

30' WIDE ROAD30' WIDE ROAD

130.00 smt

30

' W

IDE

RO

AD

180.00 smt

30' WIDE ROAD

OSR

53.00 smt

SIDE OPEN SPACE

SIDE OPEN SPACE

SIDE OPEN SPACESIDE OPEN SPACE

RE

AR

O

PE

N S

PA

CE

FR

ON

T

OP

EN

S

PA

CE

EF

F.

UN

DE

R R

OA

D W

IDE

NIN

G A

RE

A :

31

4.9

3 S

mt

450.00 smt

15.00 [49'-2 1/2"]

14.00 [45'-11"]

8.0411.81

5.6

8

17.23

8.00

8.0

0

8.7

3

8.0

7

11.8

0

3.71

19.44

25.0

8 [

82'-

3 1

/2"]

26.92 [88'-4"]13.23 [43'-5"]

7.51 [24'-7 1/2"]23.35 [76'-7 1/2"]

17.13 [56'-2"]

3.46

14.00 [45'-11"]

19.11 [62'-8 1/2"]

7.48 [24'-6 1/2"]

64.5830.33

8.2

7

27.44

16.65

7.91

15.21

16.49

8.7

5

9.1

1

8.0

4

8.4

7

0.9

0

23.36

2.3

1

31.0

9

10.00

1.9

0

11.17

2.4

5

10.771.56 11.24

1.3

8 5.15

0.5

5

5.74

0.9

8

10.46

0.4

6 5.59

1.3

0 4.65

8.1

25.6

9

9.10

9.69

8.2

0

8.0

0

11.23 [36'-10"]

11.61 [38'-1"]

11.48 [37'-8"]

5.55 [18'-2 1/2"]

4.44 [14'-7"]16.41 [53'-10"]

4.8

5 [1

5'-1

1"]

4.3

7 [

14'-

4"]

2.1

1

13.45 [44'-1 1/2"]

14.6

2 [

47'-

11 1

/2"]

7.6

0 [

24'-

11"]

43.44 [142'-6 1/2"]

25.54 [83'-9 1/2"]

8.06 [26'-5"] 5.64 [18'-6"] 4.62 [15'-2"]10.01 [32'-10"]

7.91 [25'-11 1/2"]7.86 [25'-9 1/2"]

8.07 [26'-5 1/2"]7.78 [25'-6 1/2"]

7.82 [25'-8"]7.75 [25'-5"]

7.83 [25'-8 1/2"]8.43 [27'-8"]

9.02 [29'-7"]7.04 [23'-1"]

9.08 [29'-9 1/2"]7.63 [25'-0 1/2"]

7.48 [24'-6 1/2"]6.62 [21'-8 1/2"]2.347.50 [24'-7"]2.782.742.730.737.63 [25'-0 1/2"]7.77 [25'-5 1/2"]7.80 [25'-7"]4.78 [15'-8"]

3.047.83 [25'-8 1/2"]

7.67 [25'-2"]7.84 [25'-8 1/2"]2.945.68 [18'-7 1/2"]8.46 [27'-9"]10.05 [32'-11 1/2"]10.50 [34'-5 1/2"]

11.04 [36'-2 1/2"]

0.7

5

6.68 0.90

6.89

8.0

0

8.00

8.0

3

2.533.20

4.88

1.98 [6'-6"]

1.9

0

12.10

SITE PLAN

PLAN OF EXISTING OFFICE BUILDING SHANTA SRIRAM - TECH PARK

IN SURVEY NO : 126,

SITUATED AT GACHIBOWLI VILLAGE,

SERILINGAMPALLY MANDAL,

RANGA REDDY (DIST)., TELANGANA.

NORTH

9.70

GACHIBOWLI

STADIUM

TO SHAMSHABAD EXPRESS

WAY ROAD

GACHIBOWLI 'X' ROADS

TO ISB & MICRO SOFT ROAD

BO

TA

NIC

AL

GA

RD

EN

DL

F C

YB

ER

CIT

Y

ROAD

IIIT

CA

MP

US

TO

H

YD

ER

AB

AD

C

EN

TR

AL

UN

IVE

RS

ITY

TCS SYNERGY PARK

OP

EN

PL

OT

SITE

ROAD

TO KONDAPUR ROAD

RO

AD

TO

TO

LIC

HO

WK

I

OPEN PLOT

OSR

OSR

OSR

S.No Description Area (Sq.m) Area (Acres) Percentage (%)1. Ground coverage 3499.92 0.86 41.692. Internal road 3768.09 0.94 44.87

3. Open Space Reserves (OSR)

813.00 0.20 9.68

4. Area left for road widening

314.93 0.07 3.76

5. Total 8395.94 2.07 100.00

S.No Description Block A & B (Sq.m)

1. Basement 1 6200.00

2. Basement 2 6270.00

3. Basement 3 6340.00

4. Ground Floor 3679.58

5. First Floor 3828.98

6. Second Floor 4341.57

7. Third Floor 4341.57

8. Fourth Floor 4341.57

9. Fifth Floor 4341.57

10. Sixth Floor 4341.57

11. Seventh Floor 4341.57

Total 52367.98

BLOCK 'A' & 'B'

S.No Description Two Wheeler Four Wheeler

1. Basement 1 65 120

2. Basement 2 80 110

3. Basement 3 80 115

Total 225 570

PARKING DETAILS

BUILT-UP AREA

LAND USE BREAK-UP

PROJECT DEVELOPER

SHANTA SRIRAM CONSTRUCTIONS PVT. LTD

501, Oasis Centre, Somajiguda,

Begumpet Main Road, Opp. Pullareddy Sweets,

PLAN OF SHANTA SRIRAM - TECH PARK, GACHIBOWLI VILLAGE, SERILINGAMPALLY MANDAL, RANGA REDDY DISTRICT, TELANGANA.

SCALE:-1:200

FIG

- 6

Page 141: FORM Ienvironmentclearance.nic.in/writereaddata/Online/TOR/21_Feb_2018_160644530Y7EQLA6Q...Form - I (As Per New Notification of Mo.E.F dated 1-12-2009 vide SO 3067 (E)) ... As per

Shanta Sriram – Tech Park Gachibowli Village, Serilingampally Mandal, Ranga Reddy District, Telangana.

EMP Report

Project proponent

Shanta Sriram Construction Pvt. Ltd 9 B.S. Envi-Tech (P) Ltd., Sec’bad.

The following are the typical characteristics of the wastewater

considered for design of STP:

TABLE – 6

SEWAGE TREATMENT PLANT (DESIGN BASIS)

S.No

Parameter

Input Characteristics

Output Characteristics

1 pH 7 – 8 6.5 – 8.5

2 Biological Oxygen Demand

(BOD), @20C, mg/l

200 – 350 <30

3 Chemical Oxygen Demand (COD) mg/l

350 – 450 <100

4 Total Suspended Solids (TSS), mg/l

350 – 450 <30

5 Oil and Grease, mg/l 100 – 150 <10

The wastewater generated from the Shanta Sriram - Tech Park will be

collected through network of pipes. The collected wastewater will be

routed to the sewage treatment plant of 175 kld capacity. The treated

wastewater will be disposed to existing sewer line.

2.1.2 AIR ENVIRONMENT

The impact on air environment in the operation phase will be mainly

due to the following

a. Vehicular movement

b. Operation of the DG sets which are the emergency power supply

units

Vehicular movement

The emission from vehicular movement is mainly from the exhaust of

two and four wheelers.

Operation of the emergency power supply units - DG sets

2 Nos. 1250 kVA will be provided as emergency power supply.

The following measures will be implemented for control of air pollution

Page 142: FORM Ienvironmentclearance.nic.in/writereaddata/Online/TOR/21_Feb_2018_160644530Y7EQLA6Q...Form - I (As Per New Notification of Mo.E.F dated 1-12-2009 vide SO 3067 (E)) ... As per

Shanta Sriram – Tech Park Gachibowli Village, Serilingampally Mandal, Ranga Reddy District, Telangana.

EMP Report

Project proponent

Shanta Sriram Construction Pvt. Ltd 10 B.S. Envi-Tech (P) Ltd., Sec’bad.

DG sets will be operated only during emergency and are not in

continuous operation.

CPCB approved DG sets conforming to noise and emission

standard will be provided.

2.1.3 NOISE ENVIRONMENT

DG sets will be provided with acoustic enclosure conforming to CPCB

norms. Noise levels will be checked periodically using a noise pressure

level meter.

2.1.4 STORM WATER MANAGEMENT

Rain water from the roof, paved area and unpaved area will be

connected to the storm water drain at ground level.

2.1.5 GREENBELT DEVELOPMENT

No provision for greenbelt development has been made inside the

premises.

2.1.6 SOLID WASTE GENERATION

The solid waste generation from the project in the operation phase is

mainly from the following areas:

a. Domestic Solid waste

b. Solid waste from sewage treatment plant

Domestic solid waste including Garbage

The solid wastes generated during operation phase will consist of

mainly papers, cartons, thermocol, plastics, polythene bags, glass,

waste vegetables and foods etc. The quantity of solid waste generated

from the Shanta Sriram - Tech Park is 744 kg/day

The inorganic wastes will be disposed to authorized vendors for

recycling and the organic wastes will be disposed to local municipal

authorities.

Sludge from waste-water treatment

Page 143: FORM Ienvironmentclearance.nic.in/writereaddata/Online/TOR/21_Feb_2018_160644530Y7EQLA6Q...Form - I (As Per New Notification of Mo.E.F dated 1-12-2009 vide SO 3067 (E)) ... As per

Shanta Sriram – Tech Park Gachibowli Village, Serilingampally Mandal, Ranga Reddy District, Telangana.

EMP Report

Project proponent

Shanta Sriram Construction Pvt. Ltd 11 B.S. Envi-Tech (P) Ltd., Sec’bad.

The STP sludge will be conditioned and dried. The dried sludge cakes

will be disposed to the local vendors.

Page 144: FORM Ienvironmentclearance.nic.in/writereaddata/Online/TOR/21_Feb_2018_160644530Y7EQLA6Q...Form - I (As Per New Notification of Mo.E.F dated 1-12-2009 vide SO 3067 (E)) ... As per

Shanta Sriram – Tech Park Gachibowli Village, Serilingampally Mandal, Ranga Reddy District, Telangana.

EMP Report

Project proponent

Shanta Sriram Construction Pvt. Ltd 12 B.S. Envi-Tech (P) Ltd., Sec’bad.

2.1.7 ENERGY CONSERVATION

The following energy conservation measures are provided in the

building

LED/CFL lighting fixtures are provided in common areas.

Solar fencing is provided on the one side wall of the compound

2.1.8 FIRE FIGHTING DEVICES

Fire-fighting measures in the project are as follow:

TABLE - 7

1. Fire Extinguishers 511 2. Hose reel system 55 3. Wet riser 5 4. Automatic detection system 602 5. Automatic Sprinkler system 3170 6. Yard Hydrant system 12 7. Manual Call point

(Fire Alarm systems) 55

8. Underground static water tank 1,00,000 litres 9. Terrace tank 20,000 litres

The project received the NOC from the Fire Department.

Page 145: FORM Ienvironmentclearance.nic.in/writereaddata/Online/TOR/21_Feb_2018_160644530Y7EQLA6Q...Form - I (As Per New Notification of Mo.E.F dated 1-12-2009 vide SO 3067 (E)) ... As per

Shanta Sriram – Tech Park Gachibowli Village, Serilingampally Mandal, Ranga Reddy District, Telangana.

EMP Report

Project proponent

Shanta Sriram Construction Pvt. Ltd 13 B.S. Envi-Tech (P) Ltd., Sec’bad.

PHOTOGRAPHS OF THE PROJECT

Page 146: FORM Ienvironmentclearance.nic.in/writereaddata/Online/TOR/21_Feb_2018_160644530Y7EQLA6Q...Form - I (As Per New Notification of Mo.E.F dated 1-12-2009 vide SO 3067 (E)) ... As per

Shanta Sriram – Tech Park Gachibowli Village, Serilingampally Mandal, Ranga Reddy District, Telangana.

EMP Report

Project proponent

Shanta Sriram Construction Pvt. Ltd 14 B.S. Envi-Tech (P) Ltd., Sec’bad.