FORM – I
For
“SHANTA SRIRAM – TECH PARK” (Commercial Complex)
At Gachibowli Village, Serilingampally Mandal,
Ranga Reddy District, Telangana
MAY – 2017
PROJECT PROPONENT ENVIRONMENT CONSULTANT
SHANTA SRIRAM CONSTRUCTIONS PVT. LTD., Hyderabad, Telangana.
B.S. ENVI-TECH PVT. LTD., Secunderabad, Telangana. NABET Accreditation: NABET/EIA/1316/RA002
2
Form - I (As Per New Notification of Mo.E.F dated 1-12-2009 vide SO 3067 (E))
BASIC INFORMATION
S. No
Item Details
1 Name of the Project/s Commercial complex titled
“Shanta Sriram – Tech Park”
developed by
Shanta Sriram Constructions Pvt. Ltd
(SSCPL)
2 S. No. in the schedule 8(a)
3 Proposed capacity/ area/
length/ tonnage to be
handled/ command area/
lease area/ number of wells to
be drilled
Background
SSCPL constructed a commercial
complex titled “Shanta Sriram - Tech
Park” to be accommodated on a plot
area of 2.07 Acres.
This project is a violation case. A court
case was filed by Telangana Pollution
Control Board in the year 2016. The
judgement was declared on 31.08.2016
with a penalty.
The project did not obtain
Environmental Clearance from SEIAA,
Telangana. However it had constructed
the commercial complex in the year
2016.
Details are furnished in Annexure – 1.
Plot Area : 8395.94 Sq.m
Built-up Area : 52367.98 Sq.m
Building Height : 30 m
IT office and Services
Block A and Block B with (Three
Basements + Ground Floor – Seven
Floors)
3
Parking details
Parking Area : 18810.00 Sq.m
Two Wheeler : 225
Four Wheeler : 570
Commercial complex comprising IT
office and Services. The details of the
commercial complex are furnished in
the Annexure – 2.
4 New/ expansion/
modernization
New
5 Existing capacity/ Area etc. Not Applicable
6 Category of Project i.e „A‟ or „B‟ Category „B‟ 7 Does it attract the general
condition? If yes please
specify.
No
8 Does it attract the specific
condition? If yes please
specify.
No
9 Location Location Map of the project site is given
in Annexure – 3.
10 km Radius Map of Survey of India
(SOI) toposheet of the project site is
given in Annexure – 3A.
Google Earth Imagery of the project is
given in Annexure – 3B.
As per GHMC master plan the survey
numbers are designated for commercial
use. The copy of the letter from GHMC
is given in Annexure – 3C.
Photographs of the project site are given
in Annexure – 3D.
Plot/ Survey/ Khasra No 126
Village Gachibowli Village
Tehsil Serilingampally Mandal
District Ranga Reddy
State Telangana
10 Nearest railway station/
airport along with distance in
Kms.
Hitec City Railway Station 4.10 km –
NE
4
11 Nearest town, city, district
headquarters along with
distance in kms.
Hyderabad – 15.58 km – SE
12 Village panchayaths, Zilla
parishad, Municipal
Corporation, Local body
(Complete postal addresses
with telephone nos. to be
given)
Gachibowli Village, Serilingampally
Mandal, Ranga Reddy District,
Telangana.
13 Name of the applicant Shanta Sriram Constructions Private
Limited (SSCPL)
14 Registered address M/s. Shanta Sriram Constructions Pvt.
Ltd., 501, Oasis Centre, Somajiguda,
Begumpet Main Road, Opp. Pullareddy
Sweets, Hyderabad – 500016,
Telangana.
15 Address for correspondence Same as above
Name Mr. M. Narsaiah
Designation (Owner /Partner/
CEO)
Managing Director
Address 501, Oasis Centre, Somajiguda,
Begumpet Main Road, Opp. Pullareddy
Sweets, Hyderabad – 500016,
Telangana.
Pincode 500016
E- mail [email protected]
Tele-Fax. +91- 9849955881
16 Details of Alternative sites
examined, if any location of
these sites should be shown
on a toposheet.
Not Applicable, since it is a building
project.
17 Interlinked projects Not Applicable.
18 Whether separate application
of interlinked project has been
submitted?
Not Applicable.
19 If yes, date of submission Not Applicable.
20 If no, reason Not Applicable.
21 Whether the proposal involves
approval/ clearance under: if
yes, details of the same and
their status to be given.
Not Applicable.
5
(a) The Forest
(Conservation)Act, 1980
(b) The Wild Life
(Protection)Act, 1972
(c) The CRZ Notification,
1991
22 Whether there is any
Government Order/ Policy
relevant/ relating to the site?
Not Applicable.
23 Forest land involved (hectares) Nil.
24 Whether there is any litigation
pending against the project
and/or land in which the
project is propose to be set
up?
(a) Name of the court
(b) Case No
(c) Orders/ directions of the
court, if any and its relevance
with the proposed project.
Name of the
court
IV AJCJ – CUM – XXV
Metropolitan Magistrate,
Cyberabad, Kukatpally,
Miyapur
Case No 1082/2016
Court Order
received
31st Aug 2016
The copy of court order is given in
Annexure – 4.
25 Estimated Cost of Project Rs. 150 Crores
(I) Activity
1. Construction, operation or decommissioning of the Project involving
actions, which will cause physical changes in the locality (Topography,
land use, changes in water bodies, etc.)
S.No Information/Checklist
confirmation
Yes/No
Details thereof (with
approximate quantities /rates,
wherever possible) with source
of information data
1.1 Permanent or temporary
change in land use, land cover
or topography including
increase in intensity of land
use (with respect to local
land use plan)
Yes SSCPL constructed a commercial
complex titled “Shanta Sriram – Tech Park” on a plot area of
8395.94 Sq.m. (2.07 Acres)
Commercial complex comprising
two blocks of IT office and
Services (Three Basements +
Ground Floor – Seven Floors).
1.2 Clearance of existing land,
vegetation and buildings?
No Not Applicable.
6
1.3 Creation of new land uses?
Yes The land use of the site is
earmarked as commercial
development as per GHMC,
Hyderabad
The master plan of the project is
given in Annexure – 5.
1.4 Pre-construction investigations
e.g. bore houses, soil testing?
No Not Applicable.
1.5 Construction works?
Yes Built-up area : 52367.98 Sq.m
Please refer Annexure – 2.
1.6 Demolition works? No Not Applicable.
1.7 Temporary sites used for
construction works or housing
of construction workers?
No Not Applicable. The construction
of the Shanta Sriram – Tech Park
was already completed.
1.8 Above ground buildings,
structures or earthworks
including linear structures, cut
and fill or excavations
Yes The project will have two blocks
namely A and B with Three
Basements + Ground floor –
Seven Floors. Please refer
Annexure – 2.
1.9 Underground works including
mining or tunneling?
No Not Applicable.
1.10 Reclamation works? No Not Applicable.
1.11 Dredging? No Not Applicable.
1.12 Offshore structures? No Not Applicable.
1.13 Production and manufacturing
processes?
No No production / manufacturing
process are involved. This is a
building construction project.
1.14 Facilities for storage of goods or materials?
No Not Applicable. The construction
of the project was already
completed.
1.15 Facilities for treatment or
disposal of solid waste or
liquid effluents?
Yes Liquid Waste:
Operation Phase:
The wastewater generated during
operation phase will be treated to
conform to TSPCB standards in a
sewage treatment plant. Treated
wastewater will be disposed to
existing sewer line.
7
Solid Waste
Operation Phase:
The solid wastes generated during
operation phase will consist of
mainly used paper, cartons,
thermocol, plastics, polythene
bags, corrugated boxes, glass,
and organic waste from kitchen.
Solid waste generation calculation
is enclosed as Annexure – 6.
The inorganic wastes will be
disposed to authorize vendors for
recycling and the organic wastes
will be disposed to local municipal
authorities.
1.16 Facilities for long term housing
of operational workers?
No Not Applicable.
1.17 New road, rail or sea traffic
during construction or
operation?
No Not Applicable.
1.18 New road, rail, air waterborne
or other transport
infrastructure including new
or altered routes and stations,
ports, airports etc?
No Not Applicable.
1.19 Closure or diversion of existing
transport routes or
infrastructure leading to
changes in traffic
movements?
No Not Applicable.
1.20 New or diverted transmission
lines or pipelines?
No Not Applicable.
1.21 Impoundment, damming,
culverting, realignment or
other changes to the hydrology
of watercourses or aquifers?
No Not Applicable.
1.22 Stream crossings? No Not Applicable.
8
1.23 Abstraction or transfers of
from ground or surface
waters?
No Not Applicable.
1.24 Changes in water bodies or the
land surface affecting drainage
or run-off?
No Not Applicable.
1.25 Transport of personnel or
materials for construction,
operation or decommissioning?
No Not Applicable. The construction
of the project was already
completed.
1.26 Long-term dismantling or
decommissioning or
restoration works?
No Not Applicable.
1.27 Ongoing activity during
decommissioning which could
have an impact on the
environment?
No Not Applicable.
1.28 Influx of people to an area in
either temporarily or
permanently?
Yes There will be influx of people
during operation.
1.29 Introduction of alien species? No Not Applicable.
1.30 Loss of native species or
genetic diversity?
No Not Applicable.
1.31 Any other actions? No Not Applicable.
2. Use of Natural resources for construction or operation of the Project
(such as land, water, materials or energy, especially any resources
which are non-renewable or in short supply):
S. No.
Information/checklist
confirmation
Yes/No
Details thereof (with
approximate quantities /rates,
wherever possible) with source
of information data
2.1 Land especially undeveloped or
agricultural land (ha)
No Commercial complex titled
“Shanta Sriram – Tech Park” was
already completed in an area of
2.07 Acres. Commercial complex
comprising IT office and Services.
Please refer Annexure – 2.
2.2 Water (expected source &
competing users) unit: KLD
Yes Total water requirement of the
project during operation phase is
estimated 205 klpd which is
sourced from HMWS&SB/Private
9
tanker.
The fresh water requirement is
205 klpd. A STP of 175 klpd
capacity has already constructed.
It is estimated that about 115
klpd of treated wastewater is
disposed to existing sewer line.
The details of the water
requirement are furnished in the
Annexure – 7.
2.3 Minerals (MT) No Not Applicable
2.4 Construction material – stone,
aggregates, sand / soil
(expected source – MT)
No Not Applicable. Since the
construction is completed.
2.5 Forests and timber (source –
MT)
No Not required.
2.6 Energy including electricity and
fuels (source, competing users)
Unit: fuel (MT), energy (MW)
Yes The estimated power requirement
for the project is 3400 kVA. The
details of the power requirement
are furnished in the
Annexure – 8.
2.7 Any other natural resources
(use appropriate standard
units)
No Not Applicable.
3. Use, storage, transport, handling or production of substances or
materials, which could be harmful to human health or the environment
or raise concerns about actual or perceived risks to human health.
S. No.
Information/Checklist confirmation
Yes/No
Details thereof (with approximate quantities/ rates, wherever possible) with source of information data
3.1 Use of substances or materials,
which are hazardous (as per
MSIHC rules) to human health
or the environment (flora,
fauna, and water supplies)
Yes Used batteries, used lube oil from
DG sets.
3.2 Changes in occurrence of
disease or affect disease vectors
(e.g. insect or water borne
diseases)
No Nil.
10
3.3 Affect the welfare of people e.g.
by changing living conditions?
Yes The project will result in
secondary employment in terms
of service providers/facilities
management.
Employment Number of
persons
Operation phase 30
3.4 Vulnerable groups of people
who could be affected by the
project e.g. hospital patients,
children, the elderly etc.,
No Nil.
3.5 Any other causes No Nil.
4. Production of solid wastes during construction or operation or
decommissioning (MT/month)
S. No.
Information/Checklist
confirmation
Yes/No
Details thereof (with
approximate quantities/ rates,
wherever possible) with source
of information data
4.1 Spoil, overburden or mine
wastes
No Not Applicable.
4.2 Municipal waste (domestic and
or commercial wastes)
Yes The solid wastes generated during
operation phase will consist of
mainly used paper, cartons,
thermocol, plastics, polythene
bags, corrugated boxes, glass,
and organic waste from kitchen.
Please refer Annexure – 4.
The inorganic wastes will be
disposed to authorize vendors for
recycling and the organic wastes
will be disposed to local municipal
authorities.
4.3 Hazardous wastes (as per
Hazardous Waste
Management Rules)
Yes No hazardous waste will be
released from the project except
used oil from DG sets.
4.4 Other industrial process wastes No Not Applicable.
4.5 Surplus product No Not Applicable.
4.6 Sewage sludge or other sludge
from effluent treatment
Yes Dewatered/dried sludge from STP
(Sewage Treatment Plant) will be
11
disposed to local vendors.
4.7 Construction or demolition
wastes
No Not Applicable.
4.8 Redundant machinery or
equipment
No Not Applicable
4.9 Contaminated soils or other
materials
No Not applicable
4.10 Agricultural wastes No Not Applicable
4.11 Other solid wastes No Not Applicable
5. Release of pollutants / hazardous, toxic or noxious substances to air
(Kg/hr)
S. No.
Information/Checklist confirmation
Yes/No
Details thereof (with approximate quantities/ rates, wherever possible) with source of information data
5.1 Emissions from combustion of
fossil fuels from stationary or
mobile sources
Yes The operation of project does not
envisage any air pollution sources
except emission from emergency
backup DG sets.
5.2 Emissions from production
processes
No Not Applicable, since it is a
building project.
5.3 Emissions from materials
handling including storage or
transport
No Not Applicable.
5.4 Emissions from construction
activities including plant and
equipment
No Not Applicable.
5.5 Dust or odours from handling of materials including construction materials, sewage and waste
No Not Applicable.
5.6 Emissions from incineration of
waste
No Not Applicable.
5.7 Emissions from burning of
waste in open air (e.g. slash
materials, construction debris)
No Not Applicable.
5.8 Emissions from any other
sources
No Not Applicable.
12
6. Generation of Noise and Vibration, and Emissions of Light and Heat:
S. No.
Information/Checklist
confirmation
Yes/No
Details thereof (with
approximate quantities/ rates,
wherever possible) with source
of information data with source
of information data
6.1 From operation of equipment
e.g. engines, ventilation plant,
crushers
No Not Applicable
6.2 From industrial or similar
processes
No Not Applicable.
6.3 From construction or
demolition
No Not Applicable.
6.4 From blasting or piling No Not Applicable.
6.5 From construction or
operational traffic
No Not Applicable.
6.6 From lighting or cooling
systems
No Not applicable
6.7 From any other sources No Not applicable
7. Risks of contamination of land or water from releases of pollutants into
the ground or into sewers, surface waters, groundwater, coastal waters
or the sea:
S. No.
Information/Checklist
confirmation
Yes/No
Details thereof (with
approximate quantities/rates,
wherever possible) with source
of information data
7.1 From handling, storage, use or
spillage of hazardous materials
No Not Applicable.
7.2 From discharge of sewage or
other effluents to water or the
land (expected mode and place
of discharge)
Yes Treated wastewater will be disposed
into the nearby sewer line.
7.3 By deposition of pollutants
emitted to air into the land or
into water
Yes Emission from DG sets.
7.4 From any other sources No The waste water is treated in a
STP and discharged into the
sewer line.
13
7.5 Is there a risk of long term
buildup of pollutants in the
environment from these
sources?
No None.
8. Risk of accidents during construction or operation of the Project,
which could affect human health or the environment
S. No.
Information/Checklist
confirmation
Yes/No
Details thereof (with
approximate quantities/rates,
wherever possible) with source
of information data
8.1 From explosions, spillages, fires
etc from storage, handling, use
or production of hazardous
substances
No Not Applicable.
8.2 From any other causes No None.
8.3 Could the project be affected by
natural disasters causing
environmental damage (e.g.
floods, earthquakes, landslides,
cloudburst etc.)?
No The project is in inland area. The
project site falls under Zone II,
according to the Standard India
Seismic Zone Map (2014). The
structures shall be designed with
adequate safety factors.
9. Factors which should be considered (such as consequential
development) which could lead to environmental effects or the
potential for cumulative impacts with other existing or planned
activities in the locality
S. No.
Information/Checklist
confirmation
Yes/No
Details thereof (with
approximate quantities/ rates,
wherever possible) with source
of information data
9.1 Lead to development of supporting utilities, ancillary development or development stimulated by the project which could have impact on the environment e.g.: Supporting infrastructure (roads, power supply, waste or waste water treatment, etc.)
Yes
Supporting infrastructure within the project site will be developed.
14
Housing development Yes This project will provide impetus for housing development in surrounding areas.
Extractive industries No Not Applicable
Supply industries No Not Applicable
Other Yes Unskilled/semiskilled/skilled
labour will be employed for facility
maintenance services and other
services.
9.2 Lead to after-use of the site, which could have an impact on the environment
No Not applicable.
9.3 Set a precedent for later developments
No Not Applicable.
9.4 Have cumulative effects due to proximity to other existing or planned projects with similar effects
Yes The area is earmarked for commercial use as per GHMC master plan.
(II) Environmental Sensitivity
S. No.
Areas Name/ Identity
Aerial distance (within 15 km.) project location boundary
1 Areas protected under
international conventions,
national or local legislation for
their ecological, landscape,
cultural or other related value
Golconda Fort
Qtub Shahi Tombs
Charminar
Mecca Masjid
Chowmahalla Palace
Birla Temple
8.50 km – SSE
7.00 km – SSE
15.80 km – SE
15.40 km – SE
15.70 km – SE
12.90 km – E
2 Areas which are important or
sensitive for ecological reasons
- Wetlands, watercourses or
other water bodies, coastal
zone, biospheres, mountains,
forests
Water Bodies
Musi River
Hussain Sagar
Durgam Cheruvu
Himayatsagar
Osman Sagar
Suraram Cheruvu
Pedda Cheruvu
7.00 km – S
11.60 km – ESE
3.50 km – SE
11.40 km – S
7.50 km – SW
4.80 km – E
2.70 km – SSE
15
Kamunoni Cheruvu
Maisamma Cheruvu
Nerla Cheruvu
Gopi Cheruvu
Nallagandla
Cheruvu
ICRISAT Lake
Vanam Cheruvu
Mella Cheruvu
Kotha Cheruvu
5.10 km – ENE
6.10 km – ENE
1.60 km – NNE
3.8 km – NW
4.6 km – WNW
10.0 km – WNW
7.4 km – WNW
7.5 km – WNW
7.5 km – SW
Reserved Forest
(RF)
Kottaguda RF
Gaganpahad RF
Domnair RF
Chilkur Protected
Forest
8.50 km – SSE
9.00 km – S
3 Areas used by protected,
important or sensitive species
of flora or fauna for breeding,
nesting, foraging, resting, over
wintering, migration
Mrugavani National
Park
Kasu Brahmananda
Reddy National Park
Nehru Zoological
Park
10.77 km – SSW
6.80 km – ESE
14.0 km – SE
4 Inland, coastal, marine or
underground waters
Inland Not Applicable.
5 State, National boundaries Telangana –
Karnataka
(State Boundary)
70.0 km – W
6 Routes or facilities used by the
public for access to recreation
or other tourist, pilgrim areas
None Not Applicable
7 Defence installations Greyhound facility 9.50 km – SSW
8 Densely populated or built-up
area
Hyderabad
Population –
39,43,323
Ranga Reddy
District Population –
52,96,741
Census Data – 2011
15.58 km –SE
16
9 Areas occupied by sensitive
man-made land uses
(hospitals, schools, places of
worship, community facilities)
Schools
NASR Boys school
Euro School
The Gaudium school
Oakridge
International School
Meridian School
Green Gables
International School
Hillside School
Rockwell
International School
1.86 km – ESE
2.46 km – SE
2.76 km – SSW
3.20 km – SSE
3.21 km – ENE
3.88 km – ENE
4.64 km – SE
4.73 km – ESE
Colleges
International
Institute of
Information
Technology
Indian School of
Business
National Institute of
Fashion Technology
Sri Venkateshwara
College of Pharmacy
0.68 km – W
2.00 km – SW
3.07 km – ENE
3.22 km – ESE
Hospitals
Himagiri Hospital
KIMS hospital
Pace Hospital
Care Hospital
Omni Hospital
Citizen Hospital
Srikara Hospital
0.60 km – SE
2.53 km – NE
3.14 km – E
2.55 km – SE
4.79 km – E
5.37 km – NW
5.01 km – NNW
17
10 Areas containing important,
high quality or scarce resources
(ground water resources,
surface resources, forestry,
agriculture, fisheries, tourism,
minerals)
Water Bodies
Musi River
Hussain Sagar
Durgam Cheruvu
Himayatsagar
Osman Sagar
Suraram Cheruvu
Pedda Cheruvu
Kamunoni Cheruvu
Maisamma Cheruvu
Nerla Cheruvu
Gopi Cheruvu
Nallagandla
Cheruvu
ICRISAT Lake
Vanam Cheruvu
Mella Cheruvu
Kotha Cheruvu
7.00 km – S
11.60 km – ESE
3.50 km – SE
11.40 km – S
7.50 km – SW
4.80 km – E
2.70 km – SSE
5.10 km – ENE
6.10 km – ENE
1.60 km – NNE
3.8 km – NW
4.6 km – WNW
10.0 km – WNW
7.4 km – WNW
7.5 km – WNW
7.5 km – SW
11 Areas already subjected to
pollution or environmental
damage. (those where existing
legal environmental standards
are exceeded)
None Not Applicable
12 Areas susceptible to natural
hazard which could cause
the project to present
environmental problems
(earthquakes, subsidence,
landslides, erosion, flooding or
extreme or adverse climatic
conditions)
Nil. The project area
is inland and falls
under Zone II,
according to the
Standard India
Seismic Zone Map
(2014).
Not Applicable
PROJECT PROPONENT : Shanta Sriram Construction Pvt. Ltd
PROJECT NAME : Shanta Sriram – Tech Park
LOCATION : Gachibowli Village, Serilingampally
Mandal, Ranga Reddy District, Telangana
SUBJECT : Form 1
LIST OF ANNEXURES
S. No. ANNEXURES NUMBER
DESCRIPTION
1. Annexure – 1 Chronology of the project
2. Annexure – 2 Facilities of the Tech Park
3. Annexure – 3 Location Map
4. Annexure – 3A 10 km Radius Map
5. Annexure – 3B Google Earth Imagery
6. Annexure – 3C Copy of HMDA letter
7. Annexure – 3D Photographs of the site
8. Annexure – 4 Copy of the court order
9. Annexure – 5 Master plan of the project
10. Annexure – 6 Solid waste generation
11. Annexure – 7 Water and wastewater balance
12. Annexure – 8 Power requirement
ANNEXURE – 1
PROJECT PROPONENT : Shanta Sriram Construction Pvt. Ltd
PROJECT NAME : Shanta Sriram – Tech Park
LOCATION : Gachibowli Village, Serilingampally
Mandal, Ranga Reddy District, Telangana
SUBJECT : Chronology of the project
COMMERCIAL COMPLEX SHANTA SRIRAM – TECH PARK
S.No. Description Status
1. Date of Land Acquisition 2005
2. Date of Application to GHMC for plan
approval (Old)
2008
3. Date of Application to GHMC for plan
approval (Revised)
2013
4. Permit No. (Old - 2008) G/104/BP/WZ/447/08
5. Date of GHMC plan Approval (Old
2008)
23.09.2008
6. Application No. (Revised 2013) 62846/24/07/2013/HO
7. Permit No. (Revised 2013) 40076/HO/WZ/Cir-11/2015
8. Date of GHMC plan Approval 13.03.2015
9. Date of start of construction 2005
10. Date of completion of construction 2016
11. Application to SEIAA, AP 27.07.2013
12. Letter vide No. SEIAA/AP/RRD-2013-3786
13. SEIAA, Andhra Pradesh letter dated 25.09.2013
14. Court case filed by Department of
Environment
May 2016
15. Name of the court IV AJCJ – CUM – XXV
Metropolitan Magistrate,
Cyberabad, Kukatpally,
Miyapur
16. Court Case No. 1082/2016
17. Status of the court case Court case was cleared on
31.08.2016
18. Court order Penalty of Rs. 30,000/- was
paid by the project proponent
ANNEXURE – 2
PROJECT PROPONENT : Shanta Sriram Construction Pvt. Ltd
PROJECT NAME : Shanta Sriram – Tech Park
LOCATION : Gachibowli Village, Serilingampally
Mandal, Ranga Reddy District, Telangana
SUBJECT : Facilities of the project
COMMERCIAL COMPLEX SHANTA SRIRAM – TECH PARK
A. FACILITIES OF THE PROJECT
S.No Description Height of the Building (m)
1. IT Office 30
B. LAND USE BREAK-UP
S.No Description Area (Sq.m) Area (Acres) Percentage (%)
1. Ground coverage 3499.92 0.86 41.69
2. Internal road 3768.09 0.94 44.87
3. Open Space Reserves (OSR)
813.00 0.20 9.68
4. Area left for road widening
314.93 0.07 3.76
5. Total 8395.94 2.07 100.00
C. BUILT-UP AREA
S.No Description Block A & B (Sq.m)
1. Basement – 1 6200.00
2. Basement – 2 6270.00
3. Basement – 3 6340.00
4. Ground Floor 3679.58
5. First Floor 3828.98
6. Second Floor 4341.57
7. Third Floor 4341.57
8. Fourth Floor 4341.57
9. Fifth Floor 4341.57
10. Sixth Floor 4341.57
11. Seventh Floor 4341.57
Total 52367.98
D. PARKING DETAILS
BLOCK „A‟ & „B‟ S.No Description Two Wheeler Four Wheeler
1. Basement – 1 65 120
2. Basement – 2 80 110
3. Basement – 3 80 115
Total 225 570
LOCATION MAP
INDIA
Wa ra n ga l
TELANGANA
Na lgon da
Kh a m m a m
Adila ba d
Ka rim n a ga rNiza m ba d
Me da k
Ra n ga re dd i
Ma h a bu bn a ga r
LEGEND
RAILWAY TRACK
RIVER
ROAD
DIS TRICT BOUNDARY
S TATE HIGHWAY
TALUK HEADQUARTER
DIS TRICT HEADQUARTER
TOWN
S TREAMS
NATIONAL HIGHWAY
PROJECT S ITERANGA REDDY DISTRICT
Ve n ka ta pu ra m
Ma ilwa rra m
Mirya n
Tandur
S h a h a ba dPargi
Ma rka lNa n ch e rla
Mu h a m m a da ba d
Dom a
Mora n gpa lli
Pe dda m a l
Ela l
Kote pa lli
Pa t lu r
Ma rpa lli
Ch a n gom a l
Chevella
S h a n ka rpa lli
Vikarabad
Ibrahimpatanam
Ya ch a ra m
Ma is a ra m
Bola ra mMa u la Ali
Medchal
HYDERABAD
Tu kku gu da
S e cu n de ra ba dGu n d ipe t
Golkon da
7
7
9
7& 9
Hu s a inS a ga r
PROJECT SITE
ANNEXURE - 3
N
Note : - Not to s ca le
N
Kazipet Jn.134.5 km
To
25.7 km
To
Sangareddi
Hyderabad8.7 km
To
Wadi153.0 km
To
Bolarum9.1 km
To
PROJECT SITE PREPARED BY
S ECUNDERABAD
SHOWING 10 km RADIUS
TOPOGRAPHICAL MAP
AN
NE
XU
RE
- 3A
M/s. SHANTA SRIRAM CONSTRUCTIONS PVT. LTD., CLIENT :
TITLE :
Ga ch ibowli Villa ge , S e rilin ga m pa lly Ma n da l, Ra n ga Re ddy Dis t r ict , Te la n ga n a .
PROJECT :
PROJECT S ITE
S CALE
3
S u rve y of In d ia Topos h e e t s
5 67
K
5 66
K
5 68
K
5 63
K
5 62
K
5 64
K
5 61 0
K
5 61 1
K
5 61 2
K
In de x to
0 6 km
REFER TO THIS MAP AS : - 1 : 5 0 ,0 0 0
Pu b lis h e d u n de r th e d ire ct ion of
S HEET 5 6 K / 7 FIRS T EDITION
th e S u rve yor Ge n e ra l of In d ia - 2 0 1 2
LEGEND
PROJECT SITE
GOOGLE EARTH IMAGERY FOR THE PROJECT SITEA
NN
EX
UR
E - 3
B
ANNEXURE – 3D
PHOTOGRAPHS SHOWING THE PROJECT
PROPOSED EXISTING
DISMENTLE SCALE 1: 100 M
REFERENCESREFERENCES
BUILDERS SIGNATUREENGINEER SIGNATUREARCHITECT SIGNATURE
D.G.P.A. HOLDER SIGNATURE
AREA DETAILS :
LOCATION PLANNOT TO SCALE
DUCT
PROPOSED
BUILDING
PROPOSED
BUILDING
DUCT
19.36 Smt
30' WIDE ROAD30' WIDE ROAD
130.00 smt
30
' W
IDE
RO
AD
180.00 smt
30' WIDE ROAD
OSR
53.00 smt
SIDE OPEN SPACE
SIDE OPEN SPACE
SIDE OPEN SPACESIDE OPEN SPACE
RE
AR
O
PE
N S
PA
CE
FR
ON
T O
PE
N S
PA
CE
EF
F.
UN
DE
R R
OA
D W
IDE
NIN
G A
RE
A :
31
4.9
3 S
mt
450.00 smt
15.00 [49'-2 1/2"]
14.00 [45'-11"]
8.0411.81
5.6
8
17.23
8.00
8.0
0
8.7
3
8.0
7
11.8
0
3.71
19.44
25.0
8 [
82'-
3 1
/2"]
26.92 [88'-4"]13.23 [43'-5"]
7.51 [24'-7 1/2"]23.35 [76'-7 1/2"]
17.13 [56'-2"]
3.46
14.00 [45'-11"]
19.11 [62'-8 1/2"]
7.48 [24'-6 1/2"]
64.5830.33
8.2
7
27.44
16.65
7.91
15.21
16.49
8.7
5
9.1
1
8.0
4
8.4
7
0.9
0
23.36
2.3
1
31.0
9
10.00
1.9
0
11.17
2.4
5
10.771.56 11.24
1.3
8 5.15
0.5
5
5.74
0.9
8
10.46
0.4
6 5.59
1.3
0 4.65
8.1
25.6
9
9.10
9.69
8.2
0
8.0
0
11.23 [36'-10"]
11.61 [38'-1"]
11.48 [37'-8"]
5.55 [18'-2 1/2"]
4.44 [14'-7"]16.41 [53'-10"]
4.8
5 [1
5'-1
1"]
4.3
7 [
14'-
4"]
2.1
1
13.45 [44'-1 1/2"]
14.6
2 [
47'-
11 1
/2"]
7.6
0 [
24'-
11"]
43.44 [142'-6 1/2"]
25.54 [83'-9 1/2"]
8.06 [26'-5"] 5.64 [18'-6"] 4.62 [15'-2"]10.01 [32'-10"]
7.91 [25'-11 1/2"]7.86 [25'-9 1/2"]
8.07 [26'-5 1/2"]7.78 [25'-6 1/2"] 7.82 [25'-8"]
7.75 [25'-5"]7.83 [25'-8 1/2"]
8.43 [27'-8"]
9.02 [29'-7"]7.04 [23'-1"]
9.08 [29'-9 1/2"]7.63 [25'-0 1/2"]
7.48 [24'-6 1/2"]6.62 [21'-8 1/2"]2.347.50 [24'-7"]2.782.742.730.73
7.63 [25'-0 1/2"]7.77 [25'-5 1/2"]7.80 [25'-7"]4.78 [15'-8"]3.047.83 [25'-8 1/2"]
7.67 [25'-2"]7.84 [25'-8 1/2"]2.945.68 [18'-7 1/2"]8.46 [27'-9"]10.05 [32'-11 1/2"]10.50 [34'-5 1/2"]
11.04 [36'-2 1/2"]
0.7
5
6.68 0.90
6.89
8.0
0
8.00
8.0
3
2.533.20
4.88
1.98 [6'-6"]
1.9
0
12.10
SITE PLAN
PLAN OF EXISTING OFFICE BUILDING SHANTA SRIRAM - TECH PARK
IN SURVEY NO : 126,
SITUATED AT GACHIBOWLI VILLAGE,
SERILINGAMPALLY MANDAL,
RANGA REDDY (DIST)., TELANGANA.
NORTH
9.70
GACHIBOWLI
STADIUM
TO SHAMSHABAD EXPRESS
WAY ROAD
GACHIBOWLI 'X' ROADS
TO ISB & MICRO SOFT ROAD
BO
TA
NIC
AL
GA
RD
EN
DL
F C
YB
ER
CIT
Y
ROAD
IIIT
CA
MP
US
TO
H
YD
ER
AB
AD
C
EN
TR
AL
UN
IVE
RS
ITY
TCS SYNERGY PARK
OP
EN
PL
OT
SITE
ROAD
TO KONDAPUR ROAD
RO
AD
TO
TO
LIC
HO
WK
I
OPEN PLOT
OSR
OSR
OSR
S.No Description Area (Sq.m) Area (Acres) Percentage (%)1. Ground coverage 3499.92 0.86 41.69
2. Internal road 3768.09 0.94 44.87
3. Open Space Reserves (OSR)
813.00 0.20 9.68
4. Area left for road widening
314.93 0.07 3.76
5. Total 8395.94 2.07 100.00
S.No Description Block A & B (Sq.m)
1. Basement 1 6200.00
2. Basement 2 6270.00
3. Basement 3 6340.00
4. Ground Floor 3679.58
5. First Floor 3828.98
6. Second Floor 4341.57
7. Third Floor 4341.57
8. Fourth Floor 4341.57
9. Fifth Floor 4341.57
10. Sixth Floor 4341.57
11. Seventh Floor 4341.57
Total 52367.98
BLOCK 'A' & 'B'
S.No Description Two Wheeler Four Wheeler
1. Basement 1 65 120
2. Basement 2 80 110
3. Basement 3 80 115
Total 225 570
PARKING DETAILS
BUILT-UP AREA
LAND USE BREAK-UP
PROJECT DEVELOPER
SHANTA SRIRAM CONSTRUCTIONS PVT. LTD
501, Oasis Centre, Somajiguda,
Begumpet Main Road, Opp. Pullareddy Sweets,
PLAN OF SHANTA SRIRAM - TECH PARK, GACHIBOWLI VILLAGE, SERILINGAMPALLY MANDAL, RANGA REDDY DISTRICT, TELANGANA.
SCALE:-1:200
AN
NE
XU
RE
- 5
ANNEXURE – 6
PROJECT PROPONENT : Shanta Sriram Construction Pvt. Ltd
PROJECT NAME : Shanta Sriram – Tech Park
LOCATION : Gachibowli Village, Serilingampally
Mandal, Ranga Reddy District, Telangana
SUBJECT : Solid waste generation calculation
CALCULATION:
COMMERCIAL COMPLEX
S. No. Description Number of units Number of persons/unit
Total number of persons
1. Block A 1 2606 2606
2. Block B 1 1116 1116
Total persons 3722
3. Based on solid waste generation rates in the urban areas, it is estimated per person
0.2 kg
4. Total persons 3722
5. Total waste generation in kg 744
6. Organic waste in kg (55%) 409
7. In-organic waste in kg (45%) 335
S.No. Waste Disposal Details
1. Organic waste Organic wastes will be disposed to local municipal authorities
2. Inorganic waste Inorganic wastes will be disposed to authorize vendors for recycling
ANNEXURE – 7
PROJECT PROPONENT : Shanta Sriram Construction Pvt. Ltd
PROJECT NAME : Shanta Sriram – Tech Park
LOCATION : Gachibowli Village, Serilingampally
Mandal, Ranga Reddy District, Telangana
SUBJECT : Water and wastewater balance
A. SOURCE OF WATER : Hyderabad Metropolitan Water Supply &
Sewerage Board (HMWS&SB)/Water tankers B. WATER REQUIREMENT
S.No Description Total no of persons
Drinking (lpd)
Flushing (lpd)
Drinking (klpd)
Flushing (klpd)
Total (klpd)
1. Block – A 2606 5 45 13.03 117.27 130.30
2. Block – B 1116 5 45 5.58 50.22 55.80
3. Visitors (10% Block – A & B)
373 5 45 1.87 16.79 18.66
Sub Total 4095 - - 20.48 184.28 204.76
Total water requirement 205 klpd (Approx.)
WASTEWATER GENERATION
S.No Item Details
1. Total water requirement klpd 205
2. Wastewater generation (75% Domestic and Flushing) (0.75*205 =153.75)
klpd 154
3. Design STP Capacity klpd 175
4. Treated wastewater (75% wastewater generation) (0.75*154 = 115)
klpd 115
TREATED WASTEWATER USAGE
The treated wastewater will be disposed to the existing sewer line.
FRESH WATER REQUIREMENT
The fresh water requirement is estimated at 205 klpd
Note: klpd – kilo litres per day lpd – litres per day
–
ANNEXURE – 8
PROJECT PROPONENT : Shanta Sriram Construction Pvt. Ltd
PROJECT NAME : Shanta Sriram – Tech Park
LOCATION : Gachibowli Village, Serilingampally
Mandal, Ranga Reddy District, Telangana
SUBJECT : Power Requirement
S.No Item Details
1. Source of electricity Telangana Southern Power Distribution Company Limited (TSSPDCL)
2. TSSPDCL kVA Construction phase Operation phase
- 3400
3. DG sets for power backup
kVA - 2500
4. Fuel requirement Litres per hour
- 444.77
5. DG sets Number - 2x1250
FORM – IA
For
“SHANTA SRIRAM – TECH PARK” (Commercial complex)
At Gachibowli Village, Serilingampally Mandal,
Ranga Reddy District, Telangana
MAY – 2017
PROJECT PROPONENT ENVIRONMENT CONSULTANT
SHANTA SRIRAM CONSTRUCTIONS PVT. LTD., Hyderabad, Telangana.
B.S. ENVI-TECH PVT. LTD., Secunderabad, Telangana. NABET Accreditation: NABET/EIA/1316/RA002
2
APPENDIX II
(See paragraph 6)
FORM-1 A
(Only for construction projects listed under item 8 of the Schedule) CHECK LIST OF ENVIRONMENTAL IMPACTS (Project proponents are required to provide full information and wherever necessary attach explanatory notes with the Form and submit along with proposed environmental management plan & monitoring programme)
1. LAND ENVIRONMENT
1.0 (Attach panoramic view of the
project site and the vicinity)
Site photographs are enclosed in
Annexure - A1
1.1. Will the existing landuse get
significantly altered from the project
that is not consistent with the
surroundings? (Proposed landuse
must conform to the approved
Master Plan / Development Plan of
the area. Change of landuse if any
and the statutory approval from the
competent authority are submitted).
Background
SSCPL constructed a commercial
complex titled “Shanta Sriram - Tech Park” to accommodated on a plot area of 2.07 Acres.
It is a violation case. A court case
was filed by Telangana Pollution
Control Board in the year 2016.
The judgement was declared on
31.08.2016 with a penalty.
The project did not obtain
Environmental Clearance from
SEIAA, Telangana. However it had
constructed the commercial
complex in the year 2016.
The details are furnished in
Annexure – A2.
3
Attach Maps of
(i) Site location,
(ii) Surrounding features of
the proposed site (within
500 meters) and
(iii) The site (indicating levels &
contours) to appropriate
scales.
If not available attach only
conceptual plans.
Plot Area : 8395.94 Sq.m
Built-up Area : 52367.98 Sq.m
Building Height : 30 m
IT office and Services
Block A and Block B with (Three
Basements + Ground Floor –
Seven Floors)
Parking details
Parking Area : 18810.00 Sq.m
Two Wheeler : 225 Nos.
Four Wheeler : 570 Nos.
The various facilities of the
Commercial complex are given in
Annexure – A3.
As per GHMC master plan, the
survey numbers are designated
for commercial use. The copy of
the letter from GHMC is given in
Annexure – A4.
The Master plan of project is given
in Annexure – A5.
Maps for the project site
Annexures
Location Map Annexure A6
10km radius map
Annexure A7
500m Key map Annexure A8
Google Earth Imagery
Annexure A9
1.2. List out all the major project
requirements in terms of the land
area, built up area, water
consumption, power requirement,
connectivity, community facilities,
The salient features of the
completed project are given in
Annexure – A10.
4
parking needs etc.
1.3. What are the likely impacts of the
proposed activity on the existing
facilities adjacent to the proposed
site? (Such as open spaces,
community facilities, details of the
existing landuse, disturbance to the
local ecology).
The site and surrounding areas
are earmarked as commercial
development as per the master
plan of GHMC
1.4. Will there be any significant land
disturbance resulting in erosion,
subsidence & instability?
(Details of soil type, slope analysis,
vulnerability to subsidence,
seismicity etc may be given).
Not Applicable.
1.5. Will the proposal involve alteration
of natural drainage systems? (Give
details on a contour map showing
the natural drainage near the
proposed project site)
A proper storm water
management has been
implemented.
1.6. What are the quantities of
earthwork involved in the
construction activity-cutting, filling,
reclamation etc. (Give details of the
quantities of earthwork involved,
transport of fill materials from
outside the site etc)
Not Applicable.
1.7. Give details regarding water supply,
waste handling etc during the
construction period.
Not Applicable.
1.8. Will the low-lying areas & wetlands
get altered? (Provide details of how
low lying and wetlands are getting
modified from the proposed activity)
None.
1.9. Whether construction debris &
waste during construction cause
health hazard? (Give quantities of
various types of wastes generated
during construction including the
construction labour and the means
of disposal)
Not Applicable.
5
2. WATER ENVIRONMENT
2.1. Give the total quantity of water
requirement for the proposed
project with the breakup of
requirements for various uses. How
will the water requirement met?
State the sources & quantities and
furnish a water balance statement.
Total water requirement of the
project is estimated as 205 klpd.
Details of the water and
wastewater balance are given in
Annexure – A11.
2.2. What is the capacity (dependable
flow or yield) of the proposed source
of water?
The source of water will be through
HMWS&SB/Private tankers.
2.3. What is the quality of water
required, in case, the supply is not
from a municipal source? (Provide
physical, chemical, biological
characteristics with class of water
quality)
Not Applicable.
2.4. How much of the water
requirement can be met from the
recycling of treated wastewater?
(Give the details of quantities,
sources and usage)
A STP of 175 kld capacity is
provided. Treated wastewater of
115 klpd is disposed to existing
sewer line
Please refer Annexure – A11.
2.5. Will there be diversion of water
from other users? (Please assess
the impacts of the project on other
existing uses and quantities of
consumption)
No
2.6. What is the incremental pollution
load from wastewater generated
from the proposed activity? (Give
details of the quantities and
composition of wastewater
generated from the proposed
activity)
The wastewater generated will be
treated in a Sewage Treatment
Plant (STP) within project premises
and will be disposed to the existing
sewer line
2.7. Give details of the water
requirements met from water
harvesting? Furnish details of the
facilities created.
The roof rain water will be
collected from the terrace of the
building and discharge to the
existing storm water drain.
6
2.8. What would be the impact of the
land use changes occurring due to
the proposed project on the runoff
characteristics (quantitative as well
as qualitative) of the area in the
post construction phase on a long-
term basis? Would it aggravate the
problems of flooding or water
logging in any way?
A well design storm water
management has been
constructed.
2.9. What are the impacts of the
proposal on the ground water? (Will
there be tapping of ground water;
give the details of ground water
table, recharging capacity, and
approvals obtained from competent
authority, if any)
Nil.
2.10. What precautions/measures are
taken to prevent the run-off from
construction activities polluting
land & aquifers? (Give details of
quantities and the measures taken
to avoid the adverse impacts)
Not Applicable, since the
construction is completed.
2.11. How is the storm water from within
the site managed?(State the
provisions made to avoid flooding of
the area, details of the drainage
facilities provided along with a site
layout indication contour levels)
Roof water from the respective
buildings shall be collected
through rain water down take
pipes and disposed to storm water
drain.
2.12. Will the deployment of construction
labourers particularly in the peak
period lead to unsanitary
conditions around the project site
(Justify with proper explanation)
Not Applicable.
2.13. What on-site facilities are provided
for the collection, treatment & safe
disposal of sewage? (Give details of
the quantities of wastewater
generation, treatment capacities
The wastewater generated during
the operation phase will be treated
by 175 kld capacity of STP based
on Sequential Batch Reactor
process.
7
with technology & facilities for
recycling and disposal).
2.14. Give details of dual plumbing
system if treated waste is used for
flushing of toilets of toilets or any
other use.
Not Applicable.
3. VEGETATION
3.1. Is there any threat of the project to
the biodiversity? (Give a description
of the local ecosystem with it’s unique features, if any)
No.
3.2. Will the construction involve
extensive clearing or modification of
vegetation? (Provide a detailed
account of the trees & vegetation
affected by the project)
Not Applicable, since the
construction was completed.
3.3.
What are the measures proposed to
be taken to minimize the likely
impacts on important site features
(Give details of proposal for tree
plantation, landscaping, creation of
water bodies etc along with a layout
plan to an appropriate scale)
Not Applicable, since the
construction was completed.
4. FAUNA
4.1. Is there likely to be any
displacement of fauna- both
terrestrial and aquatic or creation of
barriers for their movement? Provide
the details.
No.
4.2. Any direct or indirect impacts on the
avifauna of the area? Provide
details.
Not Applicable.
4.3. Prescribe measures such as
corridors, fish ladders etc to
mitigate adverse impacts on fauna
Not Applicable.
8
5. AIR ENVIRONMENT
5.1. Will the project increase
atmospheric concentration of gases
& result in heat islands? (Give
details of background air quality
levels with predicted values based
on dispersion models taking into
account the increased traffic
generation as a result of the
proposed constructions)
Diesel Generator (DG) sets of
2x1250 kVA will be provided for
the emergency standby power. The
DG set operation is to meet
emergency power requirements.
Hence there will be no significant
impact on air quality. Since the
usage of DG sets is for temporary
period only.
5.2. What are the impacts on generation
of dust, smoke, odorous fumes or
other hazardous gases? Give details
in relation to all the meteorological
parameters.
Not applicable. Since the
Commercial complex will have
paved roads. This will minimize
the generation of fugitive dust.
5.3. Will the proposal create shortage of
parking space for vehicles? Furnish
details of the present level of
transport infrastructure and
measures proposed for improvement
including the traffic management at
the entry & exit to the project site.
Sufficient parking slots are
provided
Commercial complex
NO.OF SLOTS
Cars 570
2 Wheelers 225
Parking Area : 18810.00 Sq.m
5.4. Provide details of the movement
patterns with internal roads, bicycle
tracks, pedestrian pathways,
footpaths etc., with areas under
each category.
The project will have internal
roads of 8m width to ensure free
flow of traffic.
5.5. Will there be significant increase in
traffic noise & vibrations? Give
details of the sources and the
measures proposed for mitigation of
the above.
Not Applicable.
5.6. What will be the impact of DG sets
& other equipment on noise levels &
vibration in & ambient air quality
around the project site? Provide
details.
DG (Diesel Generator) set will be
used as backup power option.
They will comply with Central
Pollution Control Board (CPCB)
guidelines for emission & noise
control.
9
6. AESTHETICS
6.1. Will the proposed constructions in
any way result in the obstruction
of a view, scenic amenity or
landscapes? Are these
considerations taken into account
by the proponents?
No provision for greenbelt
development has been made.
6.2. Will there be any adverse impacts
from new constructions on the
existing structures? What are the
considerations taken into
account?
No.
6.3. Whether there are any local
considerations of urban form &
urban design influencing the
design criteria? They may be
explicitly spelt out.
No.
6.4. Are there any anthropological or
archaeological sites or artifacts
nearby? State if any other
significant features in the vicinity
of the proposed site have been
considered.
Golconda Fort is at a distance of
8.50 km – SSE
7. SOCIO-ECONOMIC ASPECTS
7.1. Will the proposal result in any
changes to the demographic
structure of local population?
Provide the details.
No.
7.2. Give details of the existing social
infrastructure around the
proposed project.
The area is having a number of IT
parks, Engineering colleges and
other commercial apartment
complexes in the vicinity.
7.3. Will the project cause adverse
effects on local communities,
disturbance to sacred sites or
other cultural values? What are
the safeguards proposed?
No.
10
8. BUILDING MATERIALS
8.1. May involve the use of building
materials with high-embodied
energy. Are the construction
materials produced with energy
efficient processes? (Give details of
energy conservation measures in
the selection of building materials
and their energy efficiency)
Common area lighting are
provided to work on high energy
efficient lamps (CFL) which results
in saving general consumption.
8.2. Transport and handling of
materials during construction
may result in pollution, noise &
public nuisance. What measures
are taken to minimize the
impacts?
Not Applicable. Construction of
commercial complex was already
completed.
8.3. Are recycled materials used in
roads and structures? State the
extent of savings achieved?
Not Applicable.
8.4. Give details of the methods of
collection, segregation & disposal
of the garbage generated during
the operation phases of the
project.
The solid wastes generated during
operation phase will consist of
mainly paper, cartons, thermocol,
plastics, polythene bags, glass,
waste vegetables and foods etc,.
The inorganic wastes will be
disposed to authorize vendors for
recycling and the organic wastes
will be disposed to local municipal
authorities.
9. ENERGY CONSERVATION
9.1 Give details of the power
requirements, source of supply,
backup source etc. What is the
energy consumption assumed per
square foot of built-up area? How
have you tried to minimize energy
consumption?
Power requirement: The estimated
power requirement is 3400 kVA
The details of power requirement are
furnished in the Annexure – A12.
9.2 What type of, and capacity of,
power back-up to you plan to
The emergency power supply is
through DG Sets.
11
provide? Please refer Annexure – A12.
9.3 What are the characteristics of
the glass you plan to use?
Provide specifications of its
characteristics related to both
short wave and long wave
radiation?
Not Applicable.
9.4 What passive solar architectural
features are being used in the
building? Illustrate the
applications made in the
proposed project.
Not Applicable.
9.5 Does the layout of streets &
buildings maximize the potential
for solar energy devices? Have
you considered the use of street
lighting, emergency lighting and
solar hot water systems for use in
the building complex?
Not Applicable.
9.6 Is shading effectively used to
reduce cooling/heating loads?
What principles have been used
to maximize the shading of Walls
on the East and the West and the
Roof? How much energy saving
has been effected?
Not Applicable.
9.7 Do the structures use energy-
efficient space conditioning,
lighting and mechanical systems?
Provide technical details. Provide
details of the transformers and
motor efficiencies, lighting
intensity and air-conditioning
load assumptions? Are you using
CFC and HCFC free chillers?
Provide specifications.
The energy savings will be done by
providing common lighting, CFL and
Lifts.
9.8 What are the likely effects of the
building activity in altering the
micro-climates? Provide a self-
assessment on the likely impacts
No.
12
of the proposed construction on
creation of heat island &
inversion effects?
9.9 What are the thermal
characteristics of the building
envelope? (a) roof; (b) external
walls; and (c) fenestration? Give
details of the material used and
the U-values or the R-values of
the individual components.
Not Applicable.
9.10 What precautions & safety
measures are proposed against
fire hazards? Furnish details of
emergency plans.
Fire Extinguishers
Hose reel system
Wet riser
Automatic detection system
Automatic Sprinkler system
Yard Hydrant system
Manual Call point
(Fire Alarm systems)
Underground static water tank
Terrace tank
The project received NOC from Fire
Department.
9.11 If you are using glass as wall
material, provide details and
specifications including
emissivity and thermal
characteristics.
Not Applicable.
9.12 What is the rate of air infiltration
into the building? Provide details
of how you are mitigating the
effects of infiltration.
The rate of air filtration into the building is 5% as it is not 100% air tight building.
9.13 To what extent the non-
conventional energy technologies
are utilised in the overall energy
consumption? Provide details of
the renewable energy
technologies used.
Nil.
PROJECT PROPONENT : Shanta Sriram Construction Pvt. Ltd
PROJECT NAME : Shanta Sriram – Tech Park
LOCATION : Gachibowli Village, Serilingampally
Mandal, Ranga Reddy District, Telangana
SUBJECT : Form 1A
LIST OF ANNEXURES
S. No. ANNEXURES DESCRIPTION
1. Annexure – A1 Photographs of the site
2. Annexure – A2 Chronology of the project
3. Annexure – A3 Various facilities of the Tech Park
4. Annexure – A4 Copy of GHMC letter
5. Annexure – A5 Master plan of the project
6. Annexure – A6 Location Map
7. Annexure – A7 10 km Radius Map (Toposheet)
8. Annexure – A8 500 m Radius Map (Google Map)
9. Annexure – A9 Google Earth Imagery
10. Annexure – A10 Salient feature of the project
11. Annexure – A11 Water and wastewater balance
12. Annexure – A12 Power requirement
ANNEXURE – A1
PHOTOGRAPHS SHOWING THE PROJECT
ANNEXURE – A2
PROJECT PROPONENT : Shanta Sriram Construction Pvt. Ltd
PROJECT NAME : Shanta Sriram – Tech Park
LOCATION : Gachibowli Village, Serilingampally
Mandal, Ranga Reddy District, Telangana
SUBJECT : Chronology of the project
COMMERCIAL COMPLEX SHANTA SRIRAM – TECH PARK
S.No. Description Status
1. Date of Land Acquisition 2005
2. Date of Application to GHMC for plan
approval (Old)
2008
3. Date of Application to GHMC for plan
approval (Revised)
2013
4. Permit No. (Old - 2008) G/104/BP/WZ/447/08
5. Date of GHMC plan Approval (Old
2008)
23.09.2008
6. Application No. (Revised 2013) 62846/24/07/2013/HO
7. Permit No. (Revised 2013) 40076/HO/WZ/Cir-11/2015
8. Date of GHMC plan Approval 13.03.2015
9. Date of start of construction 2005
10. Date of completion of construction 2016
11. Application to SEIAA, AP 27.07.2013
12. Letter vide No. SEIAA/AP/RRD-2013-3786
13. SEIAA, Andhra Pradesh letter dated 25.09.2013
14. Court case filed by Department of
Environment
May 2016
15. Name of the court IV AJCJ – CUM – XXV
Metropolitan Magistrate,
Cyberabad, Kukatpally,
Miyapur
16. Court Case No. 1082/2016
17. Status of the court case Court case was cleared on
31.08.2016
18. Court order Penalty of Rs. 30,000/- was
paid by the project proponent
ANNEXURE – A3
PROJECT PROPONENT : Shanta Sriram Construction Pvt. Ltd
PROJECT NAME : Shanta Sriram – Tech Park
LOCATION : Gachibowli Village, Serilingampally
Mandal, Ranga Reddy District, Telangana
SUBJECT : Facilities of the project
COMMERCIAL COMPLEX SHANTA SRIRAM – TECH PARK
A. FACILITIES OF THE PROJECT
S.No Description Height of the Building (m)
1. IT Office 30
B. LAND USE BREAK-UP
S.No Description Area (Sq.m) Area (Acres) Percentage (%)
1. Ground coverage 3499.92 0.86 41.69
2. Internal road 3768.09 0.94 44.87
3. Open Space Reserves (OSR)
813.00 0.20 9.68
4. Area left for road widening
314.93 0.07 3.76
5. Total 8395.94 2.07 100.00
C. BUILT-UP AREA
S.No Description Block A & B (Sq.m)
1. Basement – 1 6200.00
2. Basement – 2 6270.00
3. Basement – 3 6340.00
4. Ground Floor 3679.58
5. First Floor 3828.98
6. Second Floor 4341.57
7. Third Floor 4341.57
8. Fourth Floor 4341.57
9. Fifth Floor 4341.57
10. Sixth Floor 4341.57
11. Seventh Floor 4341.57
Total 52367.98
D. PARKING DETAILS
BLOCK „A‟ & „B‟ S.No Description Two Wheeler Four Wheeler
1. Basement – 1 65 120
2. Basement – 2 80 110
3. Basement – 3 80 115
Total 225 570
PROPOSED EXISTING
DISMENTLE SCALE 1: 100 M
REFERENCESREFERENCES
BUILDERS SIGNATUREENGINEER SIGNATUREARCHITECT SIGNATURE
D.G.P.A. HOLDER SIGNATURE
AREA DETAILS :
LOCATION PLANNOT TO SCALE
DUCT
PROPOSED
BUILDING
PROPOSED
BUILDING
DUCT
19.36 Smt
30' WIDE ROAD30' WIDE ROAD
130.00 smt
30
' W
IDE
RO
AD
180.00 smt
30' WIDE ROAD
OSR
53.00 smt
SIDE OPEN SPACE
SIDE OPEN SPACE
SIDE OPEN SPACESIDE OPEN SPACE
RE
AR
O
PE
N S
PA
CE
FR
ON
T O
PE
N S
PA
CE
EF
F.
UN
DE
R R
OA
D W
IDE
NIN
G A
RE
A :
31
4.9
3 S
mt
450.00 smt
15.00 [49'-2 1/2"]
14.00 [45'-11"]
8.0411.81
5.6
8
17.23
8.00
8.0
0
8.7
3
8.0
7
11.8
0
3.71
19.44
25.0
8 [
82'-
3 1
/2"]
26.92 [88'-4"]13.23 [43'-5"]
7.51 [24'-7 1/2"]23.35 [76'-7 1/2"]
17.13 [56'-2"]
3.46
14.00 [45'-11"]
19.11 [62'-8 1/2"]
7.48 [24'-6 1/2"]
64.5830.33
8.2
7
27.44
16.65
7.91
15.21
16.49
8.7
5
9.1
1
8.0
4
8.4
7
0.9
0
23.36
2.3
1
31.0
9
10.00
1.9
0
11.17
2.4
5
10.771.56 11.24
1.3
8 5.15
0.5
5
5.74
0.9
8
10.46
0.4
6 5.59
1.3
0 4.65
8.1
25.6
9
9.10
9.69
8.2
0
8.0
0
11.23 [36'-10"]
11.61 [38'-1"]
11.48 [37'-8"]
5.55 [18'-2 1/2"]
4.44 [14'-7"]16.41 [53'-10"]
4.8
5 [1
5'-1
1"]
4.3
7 [
14'-
4"]
2.1
1
13.45 [44'-1 1/2"]
14.6
2 [
47'-
11 1
/2"]
7.6
0 [
24'-
11"]
43.44 [142'-6 1/2"]
25.54 [83'-9 1/2"]
8.06 [26'-5"] 5.64 [18'-6"] 4.62 [15'-2"]10.01 [32'-10"]
7.91 [25'-11 1/2"]7.86 [25'-9 1/2"]
8.07 [26'-5 1/2"]7.78 [25'-6 1/2"] 7.82 [25'-8"]
7.75 [25'-5"]7.83 [25'-8 1/2"]
8.43 [27'-8"]
9.02 [29'-7"]7.04 [23'-1"]
9.08 [29'-9 1/2"]7.63 [25'-0 1/2"]
7.48 [24'-6 1/2"]6.62 [21'-8 1/2"]2.347.50 [24'-7"]2.782.742.730.73
7.63 [25'-0 1/2"]7.77 [25'-5 1/2"]7.80 [25'-7"]4.78 [15'-8"]3.047.83 [25'-8 1/2"]
7.67 [25'-2"]7.84 [25'-8 1/2"]2.945.68 [18'-7 1/2"]8.46 [27'-9"]10.05 [32'-11 1/2"]10.50 [34'-5 1/2"]
11.04 [36'-2 1/2"]
0.7
5
6.68 0.90
6.89
8.0
0
8.00
8.0
3
2.533.20
4.88
1.98 [6'-6"]
1.9
0
12.10
SITE PLAN
PLAN OF EXISTING OFFICE BUILDING SHANTA SRIRAM - TECH PARK
IN SURVEY NO : 126,
SITUATED AT GACHIBOWLI VILLAGE,
SERILINGAMPALLY MANDAL,
RANGA REDDY (DIST)., TELANGANA.
NORTH
9.70
GACHIBOWLI
STADIUM
TO SHAMSHABAD EXPRESS
WAY ROAD
GACHIBOWLI 'X' ROADS
TO ISB & MICRO SOFT ROAD
BO
TA
NIC
AL
GA
RD
EN
DL
F C
YB
ER
CIT
Y
ROAD
IIIT
CA
MP
US
TO
H
YD
ER
AB
AD
C
EN
TR
AL
UN
IVE
RS
ITY
TCS SYNERGY PARK
OP
EN
PL
OT
SITE
ROAD
TO KONDAPUR ROAD
RO
AD
TO
TO
LIC
HO
WK
I
OPEN PLOT
OSR
OSR
OSR
S.No Description Area (Sq.m) Area (Acres) Percentage (%)1. Ground coverage 3499.92 0.86 41.69
2. Internal road 3768.09 0.94 44.87
3. Open Space Reserves (OSR)
813.00 0.20 9.68
4. Area left for road widening
314.93 0.07 3.76
5. Total 8395.94 2.07 100.00
S.No Description Block A & B (Sq.m)
1. Basement 1 6200.00
2. Basement 2 6270.00
3. Basement 3 6340.00
4. Ground Floor 3679.58
5. First Floor 3828.98
6. Second Floor 4341.57
7. Third Floor 4341.57
8. Fourth Floor 4341.57
9. Fifth Floor 4341.57
10. Sixth Floor 4341.57
11. Seventh Floor 4341.57
Total 52367.98
BLOCK 'A' & 'B'
S.No Description Two Wheeler Four Wheeler
1. Basement 1 65 120
2. Basement 2 80 110
3. Basement 3 80 115
Total 225 570
PARKING DETAILS
BUILT-UP AREA
LAND USE BREAK-UP
PROJECT DEVELOPER
SHANTA SRIRAM CONSTRUCTIONS PVT. LTD
501, Oasis Centre, Somajiguda,
Begumpet Main Road, Opp. Pullareddy Sweets,
PLAN OF SHANTA SRIRAM - TECH PARK, GACHIBOWLI VILLAGE, SERILINGAMPALLY MANDAL, RANGA REDDY DISTRICT, TELANGANA.
SCALE:-1:200
AN
NE
XU
RE
- A5
LOCATION MAP
INDIA
Wa ra n ga l
TELANGANA
Na lgon da
Kh a m m a m
Adila ba d
Ka rim n a ga rNiza m ba d
Me da k
Ra n ga re dd i
Ma h a bu bn a ga r
LEGEND
RAILWAY TRACK
RIVER
ROAD
DIS TRICT BOUNDARY
S TATE HIGHWAY
TALUK HEADQUARTER
DIS TRICT HEADQUARTER
TOWN
S TREAMS
NATIONAL HIGHWAY
PROJECT S ITERANGA REDDY DISTRICT
Ve n ka ta pu ra m
Ma ilwa rra m
Mirya n
Tandur
S h a h a ba dPargi
Ma rka lNa n ch e rla
Mu h a m m a da ba d
Dom a
Mora n gpa lli
Pe dda m a l
Ela l
Kote pa lli
Pa t lu r
Ma rpa lli
Ch a n gom a l
Chevella
S h a n ka rpa lli
Vikarabad
Ibrahimpatanam
Ya ch a ra m
Ma is a ra m
Bola ra mMa u la Ali
Medchal
HYDERABAD
Tu kku gu da
S e cu n de ra ba dGu n d ipe t
Golkon da
7
7
9
7& 9
Hu s a inS a ga r
PROJECT SITE
ANNEXURE - A6
N
Note : - Not to s ca le
N
Kazipet Jn.134.5 km
To
25.7 km
To
Sangareddi
Hyderabad8.7 km
To
Wadi153.0 km
To
Bolarum9.1 km
To
PROJECT SITE PREPARED BY
S ECUNDERABAD
SHOWING 10 km RADIUS
TOPOGRAPHICAL MAP
AN
NE
XU
RE
- A7
M/s. SHANTA SRIRAM CONSTRUCTIONS PVT. LTD., CLIENT :
TITLE :
Ga ch ibowli Villa ge , S e rilin ga m pa lly Ma n da l, Ra n ga Re ddy Dis t r ict , Te la n ga n a .
PROJECT :
PROJECT S ITE
S CALE
3
S u rve y of In d ia Topos h e e t s
5 67
K
5 66
K
5 68
K
5 63
K
5 62
K
5 64
K
5 61 0
K
5 61 1
K
5 61 2
K
In de x to
0 6 km
REFER TO THIS MAP AS : - 1 : 5 0 ,0 0 0
Pu b lis h e d u n de r th e d ire ct ion of
S HEET 5 6 K / 7 FIRS T EDITION
th e S u rve yor Ge n e ra l of In d ia - 2 0 1 2
LEGEND
AN
NE
XU
RE
- A8
500 m GOOGLE MAP FOR THE PROJECT
PROJECT SITE
GOOGLE EARTH IMAGERY FOR THE PROJECT SITEA
NN
EX
UR
E - A
9
ANNEXURE – A10
PROJECT PROPONENT : Shanta Sriram Construction Pvt. Ltd
PROJECT NAME : Shanta Sriram – Tech Park
LOCATION : Gachibowli Village, Serilingampally
Mandal, Ranga Reddy District, Telangana
SUBJECT : Salient features of the project
A. LAND REQUIREMENT
S.No Description Details
1. The area of the project will be 2.07 Acres
2. Total plot area Sq.m 8395.94
3. Built-up area Sq.m 52367.98
4. Parking area Sq.m 18810.00
5. Two wheeler Nos. 225
6. Four wheeler Nos. 570
B. FACILITIES OF THE BUILDING
S. No. Description Height of the Building (m)
1. 1. IT building 30
C. WATER REQUIREMENT
S.No Item Details
7. Source of water: Hyderabad Metropolitan Water Supply & Sewerage Board (HMWS&SB)/Private tankers
8. Operation phase klpd 205
9. Fresh water klpd 205
10. Wastewater generation klpd 154
11. STP Capacity klpd 175
12. Treated wastewater klpd 115
S.No Item Details
13. Source of electricity Telangana Southern Power Distribution Company Limited (TSSPDCL)
14. TSSPDCL kVA Operation phase
3400
15. DG sets for power backup
kVA 2500
16. Fuel requirement Litres per hour
444.77
17. DG sets Number 2 x 1250
D. SOLID WASTE GENERATION
COMMERCIAL COMPLEX
S. No. Description Number of units
Number of persons/unit
Total number of persons
1. Block A 1 2606 2606
2. Block B 1 1116 1116
Total persons 3722
S.No Description IT Offices
1. Based on solid waste generation rates in the urban areas, it is estimated per person
0.2 kg
2. Total persons 3722
3. Total waste generation in kg 744
4. Organic waste in kg (55%) 409
5. In-organic waste in kg (45%) 335
S.No. Waste Disposal Details
1. Organic waste Organic wastes will be disposed to local municipal authorities
2. Inorganic waste Inorganic wastes will be disposed to authorize vendors for recycling
ANNEXURE – A11
PROJECT PROPONENT : Shanta Sriram Construction Pvt. Ltd
PROJECT NAME : Shanta Sriram – Tech Park
LOCATION : Gachibowli Village, Serilingampally
Mandal, Ranga Reddy District, Telangana
SUBJECT : Water and wastewater balance
A. SOURCE OF WATER : Hyderabad Metropolitan Water Supply &
Sewerage Board (HMWS&SB)/Water tankers B. WATER REQUIREMENT
S.No Description Total no of persons
Drinking (lpd)
Flushing (lpd)
Drinking (klpd)
Flushing (klpd)
Total (klpd)
1. Block – A 2606 5 45 13.03 117.27 130.30
2. Block – B 1116 5 45 5.58 50.22 55.80
3. Visitors (10% Block – A & B)
373 5 45 1.87 16.79 18.66
Sub Total 4095 - - 20.48 184.28 204.76
Total water requirement 205 klpd (Approx.)
WASTEWATER GENERATION
S.No Item Details
1. Total water requirement klpd 205
2. Wastewater generation (75% Domestic and Flushing) (0.75*205 =153.75)
klpd 154
3. Design STP Capacity klpd 175
4. Treated wastewater (75% wastewater generation) (0.75*154 = 115)
klpd 115
TREATED WASTEWATER USAGE
The treated wastewater will be disposed to the existing sewer line
FRESH WATER REQUIREMENT
The fresh water requirement is estimated at 205 klpd
Note: klpd – kilo litres per day lpd – litres per day
–
ANNEXURE – A12
PROJECT PROPONENT : Shanta Sriram Construction Pvt. Ltd
PROJECT NAME : Shanta Sriram – Tech Park
LOCATION : Gachibowli Village, Serilingampally
Mandal, Ranga Reddy District, Telangana
SUBJECT : Power Requirement
S.No Item Details
1. Source of electricity Telangana Southern Power Distribution Company Limited (TSSPDCL)
2. TSSPDCL kVA Construction phase Operation phase
- 3400
3. DG sets for power backup
kVA - 2500
4. Fuel requirement Litres per hour
- 444.77
5. DG sets Number - 2x1250
FORM – I
For
“SHANTA SRIRAM – TECH PARK” (Commercial Complex)
At Gachibowli Village, Serilingampally Mandal,
Ranga Reddy District, Telangana
MAY – 2017
PROJECT PROPONENT ENVIRONMENT CONSULTANT
SHANTA SRIRAM CONSTRUCTIONS PVT. LTD., Hyderabad, Telangana.
B.S. ENVI-TECH PVT. LTD., Secunderabad, Telangana. NABET Accreditation: NABET/EIA/1316/RA002
2
Form - I (As Per New Notification of Mo.E.F dated 1-12-2009 vide SO 3067 (E))
BASIC INFORMATION
S. No
Item Details
1 Name of the Project/s Commercial complex titled
“Shanta Sriram – Tech Park”
developed by
Shanta Sriram Constructions Pvt. Ltd
(SSCPL)
2 S. No. in the schedule 8(a)
3 Proposed capacity/ area/
length/ tonnage to be
handled/ command area/
lease area/ number of wells to
be drilled
Background
SSCPL constructed a commercial
complex titled “Shanta Sriram - Tech
Park” to be accommodated on a plot
area of 2.07 Acres.
This project is a violation case. A court
case was filed by Telangana Pollution
Control Board in the year 2016. The
judgement was declared on 31.08.2016
with a penalty.
The project did not obtain
Environmental Clearance from SEIAA,
Telangana. However it had constructed
the commercial complex in the year
2016.
Details are furnished in Annexure – 1.
Plot Area : 8395.94 Sq.m
Built-up Area : 52367.98 Sq.m
Building Height : 30 m
IT office and Services
Block A and Block B with (Three
Basements + Ground Floor – Seven
Floors)
3
Parking details
Parking Area : 18810.00 Sq.m
Two Wheeler : 225
Four Wheeler : 570
Commercial complex comprising IT
office and Services. The details of the
commercial complex are furnished in
the Annexure – 2.
4 New/ expansion/
modernization
New
5 Existing capacity/ Area etc. Not Applicable
6 Category of Project i.e ‘A’ or ‘B’ Category ‘B’ 7 Does it attract the general
condition? If yes please
specify.
No
8 Does it attract the specific
condition? If yes please
specify.
No
9 Location Location Map of the project site is given
in Annexure – 3.
10 km Radius Map of Survey of India
(SOI) toposheet of the project site is
given in Annexure – 3A.
Google Earth Imagery of the project is
given in Annexure – 3B.
As per GHMC master plan the survey
numbers are designated for commercial
use. The copy of the letter from GHMC
is given in Annexure – 3C.
Photographs of the project site are given
in Annexure – 3D.
Plot/ Survey/ Khasra No 126
Village Gachibowli Village
Tehsil Serilingampally Mandal
District Ranga Reddy
State Telangana
10 Nearest railway station/
airport along with distance in
Kms.
Hitec City Railway Station 4.10 km –
NE
4
11 Nearest town, city, district
headquarters along with
distance in kms.
Hyderabad – 15.58 km – SE
12 Village panchayaths, Zilla
parishad, Municipal
Corporation, Local body
(Complete postal addresses
with telephone nos. to be
given)
Gachibowli Village, Serilingampally
Mandal, Ranga Reddy District,
Telangana.
13 Name of the applicant Shanta Sriram Constructions Private
Limited (SSCPL)
14 Registered address M/s. Shanta Sriram Constructions Pvt.
Ltd., 501, Oasis Centre, Somajiguda,
Begumpet Main Road, Opp. Pullareddy
Sweets, Hyderabad – 500016,
Telangana.
15 Address for correspondence Same as above
Name Mr. M. Narsaiah
Designation (Owner /Partner/
CEO)
Managing Director
Address 501, Oasis Centre, Somajiguda,
Begumpet Main Road, Opp. Pullareddy
Sweets, Hyderabad – 500016,
Telangana.
Pincode 500016
E- mail [email protected]
Tele-Fax. +91- 9849955881
16 Details of Alternative sites
examined, if any location of
these sites should be shown
on a toposheet.
Not Applicable, since it is a building
project.
17 Interlinked projects Not Applicable.
18 Whether separate application
of interlinked project has been
submitted?
Not Applicable.
19 If yes, date of submission Not Applicable.
20 If no, reason Not Applicable.
21 Whether the proposal involves
approval/ clearance under: if
yes, details of the same and
their status to be given.
Not Applicable.
5
(a) The Forest
(Conservation)Act, 1980
(b) The Wild Life
(Protection)Act, 1972
(c) The CRZ Notification,
1991
22 Whether there is any
Government Order/ Policy
relevant/ relating to the site?
Not Applicable.
23 Forest land involved (hectares) Nil.
24 Whether there is any litigation
pending against the project
and/or land in which the
project is propose to be set
up?
(a) Name of the court
(b) Case No
(c) Orders/ directions of the
court, if any and its relevance
with the proposed project.
Name of the
court
IV AJCJ – CUM – XXV
Metropolitan Magistrate,
Cyberabad, Kukatpally,
Miyapur
Case No 1082/2016
Court Order
received
31st Aug 2016
The copy of court order is given in
Annexure – 4.
25 Estimated Cost of Project Rs. 150 Crores
(I) Activity
1. Construction, operation or decommissioning of the Project involving
actions, which will cause physical changes in the locality (Topography,
land use, changes in water bodies, etc.)
S.No Information/Checklist
confirmation
Yes/No
Details thereof (with
approximate quantities /rates,
wherever possible) with source
of information data
1.1 Permanent or temporary
change in land use, land cover
or topography including
increase in intensity of land
use (with respect to local
land use plan)
Yes SSCPL constructed a commercial
complex titled “Shanta Sriram – Tech Park” on a plot area of
8395.94 Sq.m. (2.07 Acres)
Commercial complex comprising
two blocks of IT office and
Services (Three Basements +
Ground Floor – Seven Floors).
1.2 Clearance of existing land,
vegetation and buildings?
No Not Applicable.
6
1.3 Creation of new land uses?
Yes The land use of the site is
earmarked as commercial
development as per GHMC,
Hyderabad
The master plan of the project is
given in Annexure – 5.
1.4 Pre-construction investigations
e.g. bore houses, soil testing?
No Not Applicable.
1.5 Construction works?
Yes Built-up area : 52367.98 Sq.m
Please refer Annexure – 2.
1.6 Demolition works? No Not Applicable.
1.7 Temporary sites used for
construction works or housing
of construction workers?
No Not Applicable. The construction
of the Shanta Sriram – Tech Park
was already completed.
1.8 Above ground buildings,
structures or earthworks
including linear structures, cut
and fill or excavations
Yes The project will have two blocks
namely A and B with Three
Basements + Ground floor –
Seven Floors. Please refer
Annexure – 2.
1.9 Underground works including
mining or tunneling?
No Not Applicable.
1.10 Reclamation works? No Not Applicable.
1.11 Dredging? No Not Applicable.
1.12 Offshore structures? No Not Applicable.
1.13 Production and manufacturing
processes?
No No production / manufacturing
process are involved. This is a
building construction project.
1.14 Facilities for storage of goods or materials?
No Not Applicable. The construction
of the project was already
completed.
1.15 Facilities for treatment or
disposal of solid waste or
liquid effluents?
Yes Liquid Waste:
Operation Phase:
The wastewater generated during
operation phase will be treated to
conform to TSPCB standards in a
sewage treatment plant. Treated
wastewater will be disposed to
existing sewer line.
7
Solid Waste
Operation Phase:
The solid wastes generated during
operation phase will consist of
mainly used paper, cartons,
thermocol, plastics, polythene
bags, corrugated boxes, glass,
and organic waste from kitchen.
Solid waste generation calculation
is enclosed as Annexure – 6.
The inorganic wastes will be
disposed to authorize vendors for
recycling and the organic wastes
will be disposed to local municipal
authorities.
1.16 Facilities for long term housing
of operational workers?
No Not Applicable.
1.17 New road, rail or sea traffic
during construction or
operation?
No Not Applicable.
1.18 New road, rail, air waterborne
or other transport
infrastructure including new
or altered routes and stations,
ports, airports etc?
No Not Applicable.
1.19 Closure or diversion of existing
transport routes or
infrastructure leading to
changes in traffic
movements?
No Not Applicable.
1.20 New or diverted transmission
lines or pipelines?
No Not Applicable.
1.21 Impoundment, damming,
culverting, realignment or
other changes to the hydrology
of watercourses or aquifers?
No Not Applicable.
1.22 Stream crossings? No Not Applicable.
8
1.23 Abstraction or transfers of
from ground or surface
waters?
No Not Applicable.
1.24 Changes in water bodies or the
land surface affecting drainage
or run-off?
No Not Applicable.
1.25 Transport of personnel or
materials for construction,
operation or decommissioning?
No Not Applicable. The construction
of the project was already
completed.
1.26 Long-term dismantling or
decommissioning or
restoration works?
No Not Applicable.
1.27 Ongoing activity during
decommissioning which could
have an impact on the
environment?
No Not Applicable.
1.28 Influx of people to an area in
either temporarily or
permanently?
Yes There will be influx of people
during operation.
1.29 Introduction of alien species? No Not Applicable.
1.30 Loss of native species or
genetic diversity?
No Not Applicable.
1.31 Any other actions? No Not Applicable.
2. Use of Natural resources for construction or operation of the Project
(such as land, water, materials or energy, especially any resources
which are non-renewable or in short supply):
S. No.
Information/checklist
confirmation
Yes/No
Details thereof (with
approximate quantities /rates,
wherever possible) with source
of information data
2.1 Land especially undeveloped or
agricultural land (ha)
No Commercial complex titled
“Shanta Sriram – Tech Park” was
already completed in an area of
2.07 Acres. Commercial complex
comprising IT office and Services.
Please refer Annexure – 2.
2.2 Water (expected source &
competing users) unit: KLD
Yes Total water requirement of the
project during operation phase is
estimated 205 klpd which is
sourced from HMWS&SB/Private
9
tanker.
The fresh water requirement is
205 klpd. A STP of 175 klpd
capacity has already constructed.
It is estimated that about 115
klpd of treated wastewater is
disposed to existing sewer line.
The details of the water
requirement are furnished in the
Annexure – 7.
2.3 Minerals (MT) No Not Applicable
2.4 Construction material – stone,
aggregates, sand / soil
(expected source – MT)
No Not Applicable. Since the
construction is completed.
2.5 Forests and timber (source –
MT)
No Not required.
2.6 Energy including electricity and
fuels (source, competing users)
Unit: fuel (MT), energy (MW)
Yes The estimated power requirement
for the project is 3400 kVA. The
details of the power requirement
are furnished in the
Annexure – 8.
2.7 Any other natural resources
(use appropriate standard
units)
No Not Applicable.
3. Use, storage, transport, handling or production of substances or
materials, which could be harmful to human health or the environment
or raise concerns about actual or perceived risks to human health.
S. No.
Information/Checklist confirmation
Yes/No
Details thereof (with approximate quantities/ rates, wherever possible) with source of information data
3.1 Use of substances or materials,
which are hazardous (as per
MSIHC rules) to human health
or the environment (flora,
fauna, and water supplies)
Yes Used batteries, used lube oil from
DG sets.
3.2 Changes in occurrence of
disease or affect disease vectors
(e.g. insect or water borne
diseases)
No Nil.
10
3.3 Affect the welfare of people e.g.
by changing living conditions?
Yes The project will result in
secondary employment in terms
of service providers/facilities
management.
Employment Number of
persons
Operation phase 30
3.4 Vulnerable groups of people
who could be affected by the
project e.g. hospital patients,
children, the elderly etc.,
No Nil.
3.5 Any other causes No Nil.
4. Production of solid wastes during construction or operation or
decommissioning (MT/month)
S. No.
Information/Checklist
confirmation
Yes/No
Details thereof (with
approximate quantities/ rates,
wherever possible) with source
of information data
4.1 Spoil, overburden or mine
wastes
No Not Applicable.
4.2 Municipal waste (domestic and
or commercial wastes)
Yes The solid wastes generated during
operation phase will consist of
mainly used paper, cartons,
thermocol, plastics, polythene
bags, corrugated boxes, glass,
and organic waste from kitchen.
Please refer Annexure – 4.
The inorganic wastes will be
disposed to authorize vendors for
recycling and the organic wastes
will be disposed to local municipal
authorities.
4.3 Hazardous wastes (as per
Hazardous Waste
Management Rules)
Yes No hazardous waste will be
released from the project except
used oil from DG sets.
4.4 Other industrial process wastes No Not Applicable.
4.5 Surplus product No Not Applicable.
4.6 Sewage sludge or other sludge
from effluent treatment
Yes Dewatered/dried sludge from STP
(Sewage Treatment Plant) will be
11
disposed to local vendors.
4.7 Construction or demolition
wastes
No Not Applicable.
4.8 Redundant machinery or
equipment
No Not Applicable
4.9 Contaminated soils or other
materials
No Not applicable
4.10 Agricultural wastes No Not Applicable
4.11 Other solid wastes No Not Applicable
5. Release of pollutants / hazardous, toxic or noxious substances to air
(Kg/hr)
S. No.
Information/Checklist confirmation
Yes/No
Details thereof (with approximate quantities/ rates, wherever possible) with source of information data
5.1 Emissions from combustion of
fossil fuels from stationary or
mobile sources
Yes The operation of project does not
envisage any air pollution sources
except emission from emergency
backup DG sets.
5.2 Emissions from production
processes
No Not Applicable, since it is a
building project.
5.3 Emissions from materials
handling including storage or
transport
No Not Applicable.
5.4 Emissions from construction
activities including plant and
equipment
No Not Applicable.
5.5 Dust or odours from handling of materials including construction materials, sewage and waste
No Not Applicable.
5.6 Emissions from incineration of
waste
No Not Applicable.
5.7 Emissions from burning of
waste in open air (e.g. slash
materials, construction debris)
No Not Applicable.
5.8 Emissions from any other
sources
No Not Applicable.
12
6. Generation of Noise and Vibration, and Emissions of Light and Heat:
S. No.
Information/Checklist
confirmation
Yes/No
Details thereof (with
approximate quantities/ rates,
wherever possible) with source
of information data with source
of information data
6.1 From operation of equipment
e.g. engines, ventilation plant,
crushers
No Not Applicable
6.2 From industrial or similar
processes
No Not Applicable.
6.3 From construction or
demolition
No Not Applicable.
6.4 From blasting or piling No Not Applicable.
6.5 From construction or
operational traffic
No Not Applicable.
6.6 From lighting or cooling
systems
No Not applicable
6.7 From any other sources No Not applicable
7. Risks of contamination of land or water from releases of pollutants into
the ground or into sewers, surface waters, groundwater, coastal waters
or the sea:
S. No.
Information/Checklist
confirmation
Yes/No
Details thereof (with
approximate quantities/rates,
wherever possible) with source
of information data
7.1 From handling, storage, use or
spillage of hazardous materials
No Not Applicable.
7.2 From discharge of sewage or
other effluents to water or the
land (expected mode and place
of discharge)
Yes Treated wastewater will be disposed
into the nearby sewer line.
7.3 By deposition of pollutants
emitted to air into the land or
into water
Yes Emission from DG sets.
7.4 From any other sources No The waste water is treated in a
STP and discharged into the
sewer line.
13
7.5 Is there a risk of long term
buildup of pollutants in the
environment from these
sources?
No None.
8. Risk of accidents during construction or operation of the Project,
which could affect human health or the environment
S. No.
Information/Checklist
confirmation
Yes/No
Details thereof (with
approximate quantities/rates,
wherever possible) with source
of information data
8.1 From explosions, spillages, fires
etc from storage, handling, use
or production of hazardous
substances
No Not Applicable.
8.2 From any other causes No None.
8.3 Could the project be affected by
natural disasters causing
environmental damage (e.g.
floods, earthquakes, landslides,
cloudburst etc.)?
No The project is in inland area. The
project site falls under Zone II,
according to the Standard India
Seismic Zone Map (2014). The
structures shall be designed with
adequate safety factors.
9. Factors which should be considered (such as consequential
development) which could lead to environmental effects or the
potential for cumulative impacts with other existing or planned
activities in the locality
S. No.
Information/Checklist
confirmation
Yes/No
Details thereof (with
approximate quantities/ rates,
wherever possible) with source
of information data
9.1 Lead to development of supporting utilities, ancillary development or development stimulated by the project which could have impact on the environment e.g.: Supporting infrastructure (roads, power supply, waste or waste water treatment, etc.)
Yes
Supporting infrastructure within the project site will be developed.
14
Housing development Yes This project will provide impetus for housing development in surrounding areas.
Extractive industries No Not Applicable
Supply industries No Not Applicable
Other Yes Unskilled/semiskilled/skilled
labour will be employed for facility
maintenance services and other
services.
9.2 Lead to after-use of the site, which could have an impact on the environment
No Not applicable.
9.3 Set a precedent for later developments
No Not Applicable.
9.4 Have cumulative effects due to proximity to other existing or planned projects with similar effects
Yes The area is earmarked for commercial use as per GHMC master plan.
(II) Environmental Sensitivity
S. No.
Areas Name/ Identity
Aerial distance (within 15 km.) project location boundary
1 Areas protected under
international conventions,
national or local legislation for
their ecological, landscape,
cultural or other related value
Golconda Fort
Qtub Shahi Tombs
Charminar
Mecca Masjid
Chowmahalla Palace
Birla Temple
8.50 km – SSE
7.00 km – SSE
15.80 km – SE
15.40 km – SE
15.70 km – SE
12.90 km – E
2 Areas which are important or
sensitive for ecological reasons
- Wetlands, watercourses or
other water bodies, coastal
zone, biospheres, mountains,
forests
Water Bodies
Musi River
Hussain Sagar
Durgam Cheruvu
Himayatsagar
Osman Sagar
Suraram Cheruvu
Pedda Cheruvu
7.00 km – S
11.60 km – ESE
3.50 km – SE
11.40 km – S
7.50 km – SW
4.80 km – E
2.70 km – SSE
15
Kamunoni Cheruvu
Maisamma Cheruvu
Nerla Cheruvu
Gopi Cheruvu
Nallagandla
Cheruvu
ICRISAT Lake
Vanam Cheruvu
Mella Cheruvu
Kotha Cheruvu
5.10 km – ENE
6.10 km – ENE
1.60 km – NNE
3.8 km – NW
4.6 km – WNW
10.0 km – WNW
7.4 km – WNW
7.5 km – WNW
7.5 km – SW
Reserved Forest
(RF)
Kottaguda RF
Gaganpahad RF
Domnair RF
Chilkur Protected
Forest
8.50 km – SSE
9.00 km – S
3 Areas used by protected,
important or sensitive species
of flora or fauna for breeding,
nesting, foraging, resting, over
wintering, migration
Mrugavani National
Park
Kasu Brahmananda
Reddy National Park
Nehru Zoological
Park
10.77 km – SSW
6.80 km – ESE
14.0 km – SE
4 Inland, coastal, marine or
underground waters
Inland Not Applicable.
5 State, National boundaries Telangana –
Karnataka
(State Boundary)
70.0 km – W
6 Routes or facilities used by the
public for access to recreation
or other tourist, pilgrim areas
None Not Applicable
7 Defence installations Greyhound facility 9.50 km – SSW
8 Densely populated or built-up
area
Hyderabad
Population –
39,43,323
Ranga Reddy
District Population –
52,96,741
Census Data – 2011
15.58 km –SE
16
9 Areas occupied by sensitive
man-made land uses
(hospitals, schools, places of
worship, community facilities)
Schools
NASR Boys school
Euro School
The Gaudium school
Oakridge
International School
Meridian School
Green Gables
International School
Hillside School
Rockwell
International School
1.86 km – ESE
2.46 km – SE
2.76 km – SSW
3.20 km – SSE
3.21 km – ENE
3.88 km – ENE
4.64 km – SE
4.73 km – ESE
Colleges
International
Institute of
Information
Technology
Indian School of
Business
National Institute of
Fashion Technology
Sri Venkateshwara
College of Pharmacy
0.68 km – W
2.00 km – SW
3.07 km – ENE
3.22 km – ESE
Hospitals
Himagiri Hospital
KIMS hospital
Pace Hospital
Care Hospital
Omni Hospital
Citizen Hospital
Srikara Hospital
0.60 km – SE
2.53 km – NE
3.14 km – E
2.55 km – SE
4.79 km – E
5.37 km – NW
5.01 km – NNW
17
10 Areas containing important,
high quality or scarce resources
(ground water resources,
surface resources, forestry,
agriculture, fisheries, tourism,
minerals)
Water Bodies
Musi River
Hussain Sagar
Durgam Cheruvu
Himayatsagar
Osman Sagar
Suraram Cheruvu
Pedda Cheruvu
Kamunoni Cheruvu
Maisamma Cheruvu
Nerla Cheruvu
Gopi Cheruvu
Nallagandla
Cheruvu
ICRISAT Lake
Vanam Cheruvu
Mella Cheruvu
Kotha Cheruvu
7.00 km – S
11.60 km – ESE
3.50 km – SE
11.40 km – S
7.50 km – SW
4.80 km – E
2.70 km – SSE
5.10 km – ENE
6.10 km – ENE
1.60 km – NNE
3.8 km – NW
4.6 km – WNW
10.0 km – WNW
7.4 km – WNW
7.5 km – WNW
7.5 km – SW
11 Areas already subjected to
pollution or environmental
damage. (those where existing
legal environmental standards
are exceeded)
None Not Applicable
12 Areas susceptible to natural
hazard which could cause
the project to present
environmental problems
(earthquakes, subsidence,
landslides, erosion, flooding or
extreme or adverse climatic
conditions)
Nil. The project area
is inland and falls
under Zone II,
according to the
Standard India
Seismic Zone Map
(2014).
Not Applicable
PROJECT PROPONENT : Shanta Sriram Construction Pvt. Ltd
PROJECT NAME : Shanta Sriram – Tech Park
LOCATION : Gachibowli Village, Serilingampally
Mandal, Ranga Reddy District, Telangana
SUBJECT : Form 1
LIST OF ANNEXURES
S. No. ANNEXURES NUMBER
DESCRIPTION
1. Annexure – 1 Chronology of the project
2. Annexure – 2 Facilities of the Tech Park
3. Annexure – 3 Location Map
4. Annexure – 3A 10 km Radius Map
5. Annexure – 3B Google Earth Imagery
6. Annexure – 3C Copy of HMDA letter
7. Annexure – 3D Photographs of the site
8. Annexure – 4 Copy of the court order
9. Annexure – 5 Master plan of the project
10. Annexure – 6 Solid waste generation
11. Annexure – 7 Water and wastewater balance
12. Annexure – 8 Power requirement
ANNEXURE – 1
PROJECT PROPONENT : Shanta Sriram Construction Pvt. Ltd
PROJECT NAME : Shanta Sriram – Tech Park
LOCATION : Gachibowli Village, Serilingampally
Mandal, Ranga Reddy District, Telangana
SUBJECT : Chronology of the project
COMMERCIAL COMPLEX SHANTA SRIRAM – TECH PARK
S.No. Description Status
1. Date of Land Acquisition 2005
2. Date of Application to GHMC for plan
approval (Old)
2008
3. Date of Application to GHMC for plan
approval (Revised)
2013
4. Permit No. (Old - 2008) G/104/BP/WZ/447/08
5. Date of GHMC plan Approval (Old
2008)
23.09.2008
6. Application No. (Revised 2013) 62846/24/07/2013/HO
7. Permit No. (Revised 2013) 40076/HO/WZ/Cir-11/2015
8. Date of GHMC plan Approval 13.03.2015
9. Date of start of construction 2005
10. Date of completion of construction 2016
11. Application to SEIAA, AP 27.07.2013
12. Letter vide No. SEIAA/AP/RRD-2013-3786
13. SEIAA, Andhra Pradesh letter dated 25.09.2013
14. Court case filed by Department of
Environment
May 2016
15. Name of the court IV AJCJ – CUM – XXV
Metropolitan Magistrate,
Cyberabad, Kukatpally,
Miyapur
16. Court Case No. 1082/2016
17. Status of the court case Court case was cleared on
31.08.2016
18. Court order Penalty of Rs. 30,000/- was
paid by the project proponent
ANNEXURE – 2
PROJECT PROPONENT : Shanta Sriram Construction Pvt. Ltd
PROJECT NAME : Shanta Sriram – Tech Park
LOCATION : Gachibowli Village, Serilingampally
Mandal, Ranga Reddy District, Telangana
SUBJECT : Facilities of the project
COMMERCIAL COMPLEX SHANTA SRIRAM – TECH PARK
A. FACILITIES OF THE PROJECT
S.No Description Height of the Building (m)
1. IT Office 30
B. LAND USE BREAK-UP
S.No Description Area (Sq.m) Area (Acres) Percentage (%)
1. Ground coverage 3499.92 0.86 41.69
2. Internal road 3768.09 0.94 44.87
3. Open Space Reserves (OSR)
813.00 0.20 9.68
4. Area left for road widening
314.93 0.07 3.76
5. Total 8395.94 2.07 100.00
C. BUILT-UP AREA
S.No Description Block A & B (Sq.m)
1. Basement – 1 6200.00
2. Basement – 2 6270.00
3. Basement – 3 6340.00
4. Ground Floor 3679.58
5. First Floor 3828.98
6. Second Floor 4341.57
7. Third Floor 4341.57
8. Fourth Floor 4341.57
9. Fifth Floor 4341.57
10. Sixth Floor 4341.57
11. Seventh Floor 4341.57
Total 52367.98
D. PARKING DETAILS
BLOCK „A‟ & „B‟ S.No Description Two Wheeler Four Wheeler
1. Basement – 1 65 120
2. Basement – 2 80 110
3. Basement – 3 80 115
Total 225 570
LOCATION MAP
INDIA
Wa ra n ga l
TELANGANA
Na lgon da
Kh a m m a m
Adila ba d
Ka rim n a ga rNiza m ba d
Me da k
Ra n ga re dd i
Ma h a bu bn a ga r
LEGEND
RAILWAY TRACK
RIVER
ROAD
DIS TRICT BOUNDARY
S TATE HIGHWAY
TALUK HEADQUARTER
DIS TRICT HEADQUARTER
TOWN
S TREAMS
NATIONAL HIGHWAY
PROJECT S ITERANGA REDDY DISTRICT
Ve n ka ta pu ra m
Ma ilwa rra m
Mirya n
Tandur
S h a h a ba dPargi
Ma rka lNa n ch e rla
Mu h a m m a da ba d
Dom a
Mora n gpa lli
Pe dda m a l
Ela l
Kote pa lli
Pa t lu r
Ma rpa lli
Ch a n gom a l
Chevella
S h a n ka rpa lli
Vikarabad
Ibrahimpatanam
Ya ch a ra m
Ma is a ra m
Bola ra mMa u la Ali
Medchal
HYDERABAD
Tu kku gu da
S e cu n de ra ba dGu n d ipe t
Golkon da
7
7
9
7& 9
Hu s a inS a ga r
PROJECT SITE
ANNEXURE - 3
N
Note : - Not to s ca le
N
Kazipet Jn.134.5 km
To
25.7 km
To
Sangareddi
Hyderabad8.7 km
To
Wadi153.0 km
To
Bolarum9.1 km
To
PROJECT SITE PREPARED BY
S ECUNDERABAD
SHOWING 10 km RADIUS
TOPOGRAPHICAL MAP
AN
NE
XU
RE
- 3A
M/s. SHANTA SRIRAM CONSTRUCTIONS PVT. LTD., CLIENT :
TITLE :
Ga ch ibowli Villa ge , S e rilin ga m pa lly Ma n da l, Ra n ga Re ddy Dis t r ict , Te la n ga n a .
PROJECT :
PROJECT S ITE
S CALE
3
S u rve y of In d ia Topos h e e t s
5 67
K
5 66
K
5 68
K
5 63
K
5 62
K
5 64
K
5 61 0
K
5 61 1
K
5 61 2
K
In de x to
0 6 km
REFER TO THIS MAP AS : - 1 : 5 0 ,0 0 0
Pu b lis h e d u n de r th e d ire ct ion of
S HEET 5 6 K / 7 FIRS T EDITION
th e S u rve yor Ge n e ra l of In d ia - 2 0 1 2
LEGEND
PROJECT SITE
GOOGLE EARTH IMAGERY FOR THE PROJECT SITEA
NN
EX
UR
E - 3
B
ANNEXURE – 3D
PHOTOGRAPHS SHOWING THE PROJECT
PROPOSED EXISTING
DISMENTLE SCALE 1: 100 M
REFERENCESREFERENCES
BUILDERS SIGNATUREENGINEER SIGNATUREARCHITECT SIGNATURE
D.G.P.A. HOLDER SIGNATURE
AREA DETAILS :
LOCATION PLANNOT TO SCALE
DUCT
PROPOSED
BUILDING
PROPOSED
BUILDING
DUCT
19.36 Smt
30' WIDE ROAD30' WIDE ROAD
130.00 smt
30
' W
IDE
RO
AD
180.00 smt
30' WIDE ROAD
OSR
53.00 smt
SIDE OPEN SPACE
SIDE OPEN SPACE
SIDE OPEN SPACESIDE OPEN SPACE
RE
AR
O
PE
N S
PA
CE
FR
ON
T O
PE
N S
PA
CE
EF
F.
UN
DE
R R
OA
D W
IDE
NIN
G A
RE
A :
31
4.9
3 S
mt
450.00 smt
15.00 [49'-2 1/2"]
14.00 [45'-11"]
8.0411.81
5.6
8
17.23
8.00
8.0
0
8.7
3
8.0
7
11.8
0
3.71
19.44
25.0
8 [
82'-
3 1
/2"]
26.92 [88'-4"]13.23 [43'-5"]
7.51 [24'-7 1/2"]23.35 [76'-7 1/2"]
17.13 [56'-2"]
3.46
14.00 [45'-11"]
19.11 [62'-8 1/2"]
7.48 [24'-6 1/2"]
64.5830.33
8.2
7
27.44
16.65
7.91
15.21
16.49
8.7
5
9.1
1
8.0
4
8.4
7
0.9
0
23.36
2.3
1
31.0
9
10.00
1.9
0
11.17
2.4
5
10.771.56 11.24
1.3
8 5.15
0.5
5
5.74
0.9
8
10.46
0.4
6 5.59
1.3
0 4.65
8.1
25.6
9
9.10
9.69
8.2
0
8.0
0
11.23 [36'-10"]
11.61 [38'-1"]
11.48 [37'-8"]
5.55 [18'-2 1/2"]
4.44 [14'-7"]16.41 [53'-10"]
4.8
5 [1
5'-1
1"]
4.3
7 [
14'-
4"]
2.1
1
13.45 [44'-1 1/2"]
14.6
2 [
47'-
11 1
/2"]
7.6
0 [
24'-
11"]
43.44 [142'-6 1/2"]
25.54 [83'-9 1/2"]
8.06 [26'-5"] 5.64 [18'-6"] 4.62 [15'-2"]10.01 [32'-10"]
7.91 [25'-11 1/2"]7.86 [25'-9 1/2"]
8.07 [26'-5 1/2"]7.78 [25'-6 1/2"] 7.82 [25'-8"]
7.75 [25'-5"]7.83 [25'-8 1/2"]
8.43 [27'-8"]
9.02 [29'-7"]7.04 [23'-1"]
9.08 [29'-9 1/2"]7.63 [25'-0 1/2"]
7.48 [24'-6 1/2"]6.62 [21'-8 1/2"]2.347.50 [24'-7"]2.782.742.730.73
7.63 [25'-0 1/2"]7.77 [25'-5 1/2"]7.80 [25'-7"]4.78 [15'-8"]3.047.83 [25'-8 1/2"]
7.67 [25'-2"]7.84 [25'-8 1/2"]2.945.68 [18'-7 1/2"]8.46 [27'-9"]10.05 [32'-11 1/2"]10.50 [34'-5 1/2"]
11.04 [36'-2 1/2"]
0.7
5
6.68 0.90
6.89
8.0
0
8.00
8.0
3
2.533.20
4.88
1.98 [6'-6"]
1.9
0
12.10
SITE PLAN
PLAN OF EXISTING OFFICE BUILDING SHANTA SRIRAM - TECH PARK
IN SURVEY NO : 126,
SITUATED AT GACHIBOWLI VILLAGE,
SERILINGAMPALLY MANDAL,
RANGA REDDY (DIST)., TELANGANA.
NORTH
9.70
GACHIBOWLI
STADIUM
TO SHAMSHABAD EXPRESS
WAY ROAD
GACHIBOWLI 'X' ROADS
TO ISB & MICRO SOFT ROAD
BO
TA
NIC
AL
GA
RD
EN
DL
F C
YB
ER
CIT
Y
ROAD
IIIT
CA
MP
US
TO
H
YD
ER
AB
AD
C
EN
TR
AL
UN
IVE
RS
ITY
TCS SYNERGY PARK
OP
EN
PL
OT
SITE
ROAD
TO KONDAPUR ROAD
RO
AD
TO
TO
LIC
HO
WK
I
OPEN PLOT
OSR
OSR
OSR
S.No Description Area (Sq.m) Area (Acres) Percentage (%)1. Ground coverage 3499.92 0.86 41.69
2. Internal road 3768.09 0.94 44.87
3. Open Space Reserves (OSR)
813.00 0.20 9.68
4. Area left for road widening
314.93 0.07 3.76
5. Total 8395.94 2.07 100.00
S.No Description Block A & B (Sq.m)
1. Basement 1 6200.00
2. Basement 2 6270.00
3. Basement 3 6340.00
4. Ground Floor 3679.58
5. First Floor 3828.98
6. Second Floor 4341.57
7. Third Floor 4341.57
8. Fourth Floor 4341.57
9. Fifth Floor 4341.57
10. Sixth Floor 4341.57
11. Seventh Floor 4341.57
Total 52367.98
BLOCK 'A' & 'B'
S.No Description Two Wheeler Four Wheeler
1. Basement 1 65 120
2. Basement 2 80 110
3. Basement 3 80 115
Total 225 570
PARKING DETAILS
BUILT-UP AREA
LAND USE BREAK-UP
PROJECT DEVELOPER
SHANTA SRIRAM CONSTRUCTIONS PVT. LTD
501, Oasis Centre, Somajiguda,
Begumpet Main Road, Opp. Pullareddy Sweets,
PLAN OF SHANTA SRIRAM - TECH PARK, GACHIBOWLI VILLAGE, SERILINGAMPALLY MANDAL, RANGA REDDY DISTRICT, TELANGANA.
SCALE:-1:200
AN
NE
XU
RE
- 5
ANNEXURE – 6
PROJECT PROPONENT : Shanta Sriram Construction Pvt. Ltd
PROJECT NAME : Shanta Sriram – Tech Park
LOCATION : Gachibowli Village, Serilingampally
Mandal, Ranga Reddy District, Telangana
SUBJECT : Solid waste generation calculation
CALCULATION:
COMMERCIAL COMPLEX
S. No. Description Number of units Number of persons/unit
Total number of persons
1. Block A 1 2606 2606
2. Block B 1 1116 1116
Total persons 3722
3. Based on solid waste generation rates in the urban areas, it is estimated per person
0.2 kg
4. Total persons 3722
5. Total waste generation in kg 744
6. Organic waste in kg (55%) 409
7. In-organic waste in kg (45%) 335
S.No. Waste Disposal Details
1. Organic waste Organic wastes will be disposed to local municipal authorities
2. Inorganic waste Inorganic wastes will be disposed to authorize vendors for recycling
ANNEXURE – 7
PROJECT PROPONENT : Shanta Sriram Construction Pvt. Ltd
PROJECT NAME : Shanta Sriram – Tech Park
LOCATION : Gachibowli Village, Serilingampally
Mandal, Ranga Reddy District, Telangana
SUBJECT : Water and wastewater balance
A. SOURCE OF WATER : Hyderabad Metropolitan Water Supply &
Sewerage Board (HMWS&SB)/Water tankers B. WATER REQUIREMENT
S.No Description Total no of persons
Drinking (lpd)
Flushing (lpd)
Drinking (klpd)
Flushing (klpd)
Total (klpd)
1. Block – A 2606 5 45 13.03 117.27 130.30
2. Block – B 1116 5 45 5.58 50.22 55.80
3. Visitors (10% Block – A & B)
373 5 45 1.87 16.79 18.66
Sub Total 4095 - - 20.48 184.28 204.76
Total water requirement 205 klpd (Approx.)
WASTEWATER GENERATION
S.No Item Details
1. Total water requirement klpd 205
2. Wastewater generation (75% Domestic and Flushing) (0.75*205 =153.75)
klpd 154
3. Design STP Capacity klpd 175
4. Treated wastewater (75% wastewater generation) (0.75*154 = 115)
klpd 115
TREATED WASTEWATER USAGE
The treated wastewater will be disposed to the existing sewer line.
FRESH WATER REQUIREMENT
The fresh water requirement is estimated at 205 klpd
Note: klpd – kilo litres per day lpd – litres per day
–
ANNEXURE – 8
PROJECT PROPONENT : Shanta Sriram Construction Pvt. Ltd
PROJECT NAME : Shanta Sriram – Tech Park
LOCATION : Gachibowli Village, Serilingampally
Mandal, Ranga Reddy District, Telangana
SUBJECT : Power Requirement
S.No Item Details
1. Source of electricity Telangana Southern Power Distribution Company Limited (TSSPDCL)
2. TSSPDCL kVA Construction phase Operation phase
- 3400
3. DG sets for power backup
kVA - 2500
4. Fuel requirement Litres per hour
- 444.77
5. DG sets Number - 2x1250
FORM – IA
For
“SHANTA SRIRAM – TECH PARK” (Commercial complex)
At Gachibowli Village, Serilingampally Mandal,
Ranga Reddy District, Telangana
MAY – 2017
PROJECT PROPONENT ENVIRONMENT CONSULTANT
SHANTA SRIRAM CONSTRUCTIONS PVT. LTD., Hyderabad, Telangana.
B.S. ENVI-TECH PVT. LTD., Secunderabad, Telangana. NABET Accreditation: NABET/EIA/1316/RA002
2
APPENDIX II
(See paragraph 6)
FORM-1 A
(Only for construction projects listed under item 8 of the Schedule) CHECK LIST OF ENVIRONMENTAL IMPACTS (Project proponents are required to provide full information and wherever necessary attach explanatory notes with the Form and submit along with proposed environmental management plan & monitoring programme)
1. LAND ENVIRONMENT
1.0 (Attach panoramic view of the
project site and the vicinity)
Site photographs are enclosed in
Annexure - A1
1.1. Will the existing landuse get
significantly altered from the project
that is not consistent with the
surroundings? (Proposed landuse
must conform to the approved
Master Plan / Development Plan of
the area. Change of landuse if any
and the statutory approval from the
competent authority are submitted).
Background
SSCPL constructed a commercial
complex titled “Shanta Sriram - Tech Park” to accommodated on a plot area of 2.07 Acres.
It is a violation case. A court case
was filed by Telangana Pollution
Control Board in the year 2016.
The judgement was declared on
31.08.2016 with a penalty.
The project did not obtain
Environmental Clearance from
SEIAA, Telangana. However it had
constructed the commercial
complex in the year 2016.
The details are furnished in
Annexure – A2.
3
Attach Maps of
(i) Site location,
(ii) Surrounding features of
the proposed site (within
500 meters) and
(iii) The site (indicating levels &
contours) to appropriate
scales.
If not available attach only
conceptual plans.
Plot Area : 8395.94 Sq.m
Built-up Area : 52367.98 Sq.m
Building Height : 30 m
IT office and Services
Block A and Block B with (Three
Basements + Ground Floor –
Seven Floors)
Parking details
Parking Area : 18810.00 Sq.m
Two Wheeler : 225 Nos.
Four Wheeler : 570 Nos.
The various facilities of the
Commercial complex are given in
Annexure – A3.
As per GHMC master plan, the
survey numbers are designated
for commercial use. The copy of
the letter from GHMC is given in
Annexure – A4.
The Master plan of project is given
in Annexure – A5.
Maps for the project site
Annexures
Location Map Annexure A6
10km radius map
Annexure A7
500m Key map Annexure A8
Google Earth Imagery
Annexure A9
1.2. List out all the major project
requirements in terms of the land
area, built up area, water
consumption, power requirement,
connectivity, community facilities,
The salient features of the
completed project are given in
Annexure – A10.
4
parking needs etc.
1.3. What are the likely impacts of the
proposed activity on the existing
facilities adjacent to the proposed
site? (Such as open spaces,
community facilities, details of the
existing landuse, disturbance to the
local ecology).
The site and surrounding areas
are earmarked as commercial
development as per the master
plan of GHMC
1.4. Will there be any significant land
disturbance resulting in erosion,
subsidence & instability?
(Details of soil type, slope analysis,
vulnerability to subsidence,
seismicity etc may be given).
Not Applicable.
1.5. Will the proposal involve alteration
of natural drainage systems? (Give
details on a contour map showing
the natural drainage near the
proposed project site)
A proper storm water
management has been
implemented.
1.6. What are the quantities of
earthwork involved in the
construction activity-cutting, filling,
reclamation etc. (Give details of the
quantities of earthwork involved,
transport of fill materials from
outside the site etc)
Not Applicable.
1.7. Give details regarding water supply,
waste handling etc during the
construction period.
Not Applicable.
1.8. Will the low-lying areas & wetlands
get altered? (Provide details of how
low lying and wetlands are getting
modified from the proposed activity)
None.
1.9. Whether construction debris &
waste during construction cause
health hazard? (Give quantities of
various types of wastes generated
during construction including the
construction labour and the means
of disposal)
Not Applicable.
5
2. WATER ENVIRONMENT
2.1. Give the total quantity of water
requirement for the proposed
project with the breakup of
requirements for various uses. How
will the water requirement met?
State the sources & quantities and
furnish a water balance statement.
Total water requirement of the
project is estimated as 205 klpd.
Details of the water and
wastewater balance are given in
Annexure – A11.
2.2. What is the capacity (dependable
flow or yield) of the proposed source
of water?
The source of water will be through
HMWS&SB/Private tankers.
2.3. What is the quality of water
required, in case, the supply is not
from a municipal source? (Provide
physical, chemical, biological
characteristics with class of water
quality)
Not Applicable.
2.4. How much of the water
requirement can be met from the
recycling of treated wastewater?
(Give the details of quantities,
sources and usage)
A STP of 175 kld capacity is
provided. Treated wastewater of
115 klpd is disposed to existing
sewer line
Please refer Annexure – A11.
2.5. Will there be diversion of water
from other users? (Please assess
the impacts of the project on other
existing uses and quantities of
consumption)
No
2.6. What is the incremental pollution
load from wastewater generated
from the proposed activity? (Give
details of the quantities and
composition of wastewater
generated from the proposed
activity)
The wastewater generated will be
treated in a Sewage Treatment
Plant (STP) within project premises
and will be disposed to the existing
sewer line
2.7. Give details of the water
requirements met from water
harvesting? Furnish details of the
facilities created.
The roof rain water will be
collected from the terrace of the
building and discharge to the
existing storm water drain.
6
2.8. What would be the impact of the
land use changes occurring due to
the proposed project on the runoff
characteristics (quantitative as well
as qualitative) of the area in the
post construction phase on a long-
term basis? Would it aggravate the
problems of flooding or water
logging in any way?
A well design storm water
management has been
constructed.
2.9. What are the impacts of the
proposal on the ground water? (Will
there be tapping of ground water;
give the details of ground water
table, recharging capacity, and
approvals obtained from competent
authority, if any)
Nil.
2.10. What precautions/measures are
taken to prevent the run-off from
construction activities polluting
land & aquifers? (Give details of
quantities and the measures taken
to avoid the adverse impacts)
Not Applicable, since the
construction is completed.
2.11. How is the storm water from within
the site managed?(State the
provisions made to avoid flooding of
the area, details of the drainage
facilities provided along with a site
layout indication contour levels)
Roof water from the respective
buildings shall be collected
through rain water down take
pipes and disposed to storm water
drain.
2.12. Will the deployment of construction
labourers particularly in the peak
period lead to unsanitary
conditions around the project site
(Justify with proper explanation)
Not Applicable.
2.13. What on-site facilities are provided
for the collection, treatment & safe
disposal of sewage? (Give details of
the quantities of wastewater
generation, treatment capacities
The wastewater generated during
the operation phase will be treated
by 175 kld capacity of STP based
on Sequential Batch Reactor
process.
7
with technology & facilities for
recycling and disposal).
2.14. Give details of dual plumbing
system if treated waste is used for
flushing of toilets of toilets or any
other use.
Not Applicable.
3. VEGETATION
3.1. Is there any threat of the project to
the biodiversity? (Give a description
of the local ecosystem with it’s unique features, if any)
No.
3.2. Will the construction involve
extensive clearing or modification of
vegetation? (Provide a detailed
account of the trees & vegetation
affected by the project)
Not Applicable, since the
construction was completed.
3.3.
What are the measures proposed to
be taken to minimize the likely
impacts on important site features
(Give details of proposal for tree
plantation, landscaping, creation of
water bodies etc along with a layout
plan to an appropriate scale)
Not Applicable, since the
construction was completed.
4. FAUNA
4.1. Is there likely to be any
displacement of fauna- both
terrestrial and aquatic or creation of
barriers for their movement? Provide
the details.
No.
4.2. Any direct or indirect impacts on the
avifauna of the area? Provide
details.
Not Applicable.
4.3. Prescribe measures such as
corridors, fish ladders etc to
mitigate adverse impacts on fauna
Not Applicable.
8
5. AIR ENVIRONMENT
5.1. Will the project increase
atmospheric concentration of gases
& result in heat islands? (Give
details of background air quality
levels with predicted values based
on dispersion models taking into
account the increased traffic
generation as a result of the
proposed constructions)
Diesel Generator (DG) sets of
2x1250 kVA will be provided for
the emergency standby power. The
DG set operation is to meet
emergency power requirements.
Hence there will be no significant
impact on air quality. Since the
usage of DG sets is for temporary
period only.
5.2. What are the impacts on generation
of dust, smoke, odorous fumes or
other hazardous gases? Give details
in relation to all the meteorological
parameters.
Not applicable. Since the
Commercial complex will have
paved roads. This will minimize
the generation of fugitive dust.
5.3. Will the proposal create shortage of
parking space for vehicles? Furnish
details of the present level of
transport infrastructure and
measures proposed for improvement
including the traffic management at
the entry & exit to the project site.
Sufficient parking slots are
provided
Commercial complex
NO.OF SLOTS
Cars 570
2 Wheelers 225
Parking Area : 18810.00 Sq.m
5.4. Provide details of the movement
patterns with internal roads, bicycle
tracks, pedestrian pathways,
footpaths etc., with areas under
each category.
The project will have internal
roads of 8m width to ensure free
flow of traffic.
5.5. Will there be significant increase in
traffic noise & vibrations? Give
details of the sources and the
measures proposed for mitigation of
the above.
Not Applicable.
5.6. What will be the impact of DG sets
& other equipment on noise levels &
vibration in & ambient air quality
around the project site? Provide
details.
DG (Diesel Generator) set will be
used as backup power option.
They will comply with Central
Pollution Control Board (CPCB)
guidelines for emission & noise
control.
9
6. AESTHETICS
6.1. Will the proposed constructions in
any way result in the obstruction
of a view, scenic amenity or
landscapes? Are these
considerations taken into account
by the proponents?
No provision for greenbelt
development has been made.
6.2. Will there be any adverse impacts
from new constructions on the
existing structures? What are the
considerations taken into
account?
No.
6.3. Whether there are any local
considerations of urban form &
urban design influencing the
design criteria? They may be
explicitly spelt out.
No.
6.4. Are there any anthropological or
archaeological sites or artifacts
nearby? State if any other
significant features in the vicinity
of the proposed site have been
considered.
Golconda Fort is at a distance of
8.50 km – SSE
7. SOCIO-ECONOMIC ASPECTS
7.1. Will the proposal result in any
changes to the demographic
structure of local population?
Provide the details.
No.
7.2. Give details of the existing social
infrastructure around the
proposed project.
The area is having a number of IT
parks, Engineering colleges and
other commercial apartment
complexes in the vicinity.
7.3. Will the project cause adverse
effects on local communities,
disturbance to sacred sites or
other cultural values? What are
the safeguards proposed?
No.
10
8. BUILDING MATERIALS
8.1. May involve the use of building
materials with high-embodied
energy. Are the construction
materials produced with energy
efficient processes? (Give details of
energy conservation measures in
the selection of building materials
and their energy efficiency)
Common area lighting are
provided to work on high energy
efficient lamps (CFL) which results
in saving general consumption.
8.2. Transport and handling of
materials during construction
may result in pollution, noise &
public nuisance. What measures
are taken to minimize the
impacts?
Not Applicable. Construction of
commercial complex was already
completed.
8.3. Are recycled materials used in
roads and structures? State the
extent of savings achieved?
Not Applicable.
8.4. Give details of the methods of
collection, segregation & disposal
of the garbage generated during
the operation phases of the
project.
The solid wastes generated during
operation phase will consist of
mainly paper, cartons, thermocol,
plastics, polythene bags, glass,
waste vegetables and foods etc,.
The inorganic wastes will be
disposed to authorize vendors for
recycling and the organic wastes
will be disposed to local municipal
authorities.
9. ENERGY CONSERVATION
9.1 Give details of the power
requirements, source of supply,
backup source etc. What is the
energy consumption assumed per
square foot of built-up area? How
have you tried to minimize energy
consumption?
Power requirement: The estimated
power requirement is 3400 kVA
The details of power requirement are
furnished in the Annexure – A12.
9.2 What type of, and capacity of,
power back-up to you plan to
The emergency power supply is
through DG Sets.
11
provide? Please refer Annexure – A12.
9.3 What are the characteristics of
the glass you plan to use?
Provide specifications of its
characteristics related to both
short wave and long wave
radiation?
Not Applicable.
9.4 What passive solar architectural
features are being used in the
building? Illustrate the
applications made in the
proposed project.
Not Applicable.
9.5 Does the layout of streets &
buildings maximize the potential
for solar energy devices? Have
you considered the use of street
lighting, emergency lighting and
solar hot water systems for use in
the building complex?
Not Applicable.
9.6 Is shading effectively used to
reduce cooling/heating loads?
What principles have been used
to maximize the shading of Walls
on the East and the West and the
Roof? How much energy saving
has been effected?
Not Applicable.
9.7 Do the structures use energy-
efficient space conditioning,
lighting and mechanical systems?
Provide technical details. Provide
details of the transformers and
motor efficiencies, lighting
intensity and air-conditioning
load assumptions? Are you using
CFC and HCFC free chillers?
Provide specifications.
The energy savings will be done by
providing common lighting, CFL and
Lifts.
9.8 What are the likely effects of the
building activity in altering the
micro-climates? Provide a self-
assessment on the likely impacts
No.
12
of the proposed construction on
creation of heat island &
inversion effects?
9.9 What are the thermal
characteristics of the building
envelope? (a) roof; (b) external
walls; and (c) fenestration? Give
details of the material used and
the U-values or the R-values of
the individual components.
Not Applicable.
9.10 What precautions & safety
measures are proposed against
fire hazards? Furnish details of
emergency plans.
Fire Extinguishers
Hose reel system
Wet riser
Automatic detection system
Automatic Sprinkler system
Yard Hydrant system
Manual Call point
(Fire Alarm systems)
Underground static water tank
Terrace tank
The project received NOC from Fire
Department.
9.11 If you are using glass as wall
material, provide details and
specifications including
emissivity and thermal
characteristics.
Not Applicable.
9.12 What is the rate of air infiltration
into the building? Provide details
of how you are mitigating the
effects of infiltration.
The rate of air filtration into the building is 5% as it is not 100% air tight building.
9.13 To what extent the non-
conventional energy technologies
are utilised in the overall energy
consumption? Provide details of
the renewable energy
technologies used.
Nil.
PROJECT PROPONENT : Shanta Sriram Construction Pvt. Ltd
PROJECT NAME : Shanta Sriram – Tech Park
LOCATION : Gachibowli Village, Serilingampally
Mandal, Ranga Reddy District, Telangana
SUBJECT : Form 1A
LIST OF ANNEXURES
S. No. ANNEXURES DESCRIPTION
1. Annexure – A1 Photographs of the site
2. Annexure – A2 Chronology of the project
3. Annexure – A3 Various facilities of the Tech Park
4. Annexure – A4 Copy of GHMC letter
5. Annexure – A5 Master plan of the project
6. Annexure – A6 Location Map
7. Annexure – A7 10 km Radius Map (Toposheet)
8. Annexure – A8 500 m Radius Map (Google Map)
9. Annexure – A9 Google Earth Imagery
10. Annexure – A10 Salient feature of the project
11. Annexure – A11 Water and wastewater balance
12. Annexure – A12 Power requirement
ANNEXURE – A1
PHOTOGRAPHS SHOWING THE PROJECT
ANNEXURE – A2
PROJECT PROPONENT : Shanta Sriram Construction Pvt. Ltd
PROJECT NAME : Shanta Sriram – Tech Park
LOCATION : Gachibowli Village, Serilingampally
Mandal, Ranga Reddy District, Telangana
SUBJECT : Chronology of the project
COMMERCIAL COMPLEX SHANTA SRIRAM – TECH PARK
S.No. Description Status
1. Date of Land Acquisition 2005
2. Date of Application to GHMC for plan
approval (Old)
2008
3. Date of Application to GHMC for plan
approval (Revised)
2013
4. Permit No. (Old - 2008) G/104/BP/WZ/447/08
5. Date of GHMC plan Approval (Old
2008)
23.09.2008
6. Application No. (Revised 2013) 62846/24/07/2013/HO
7. Permit No. (Revised 2013) 40076/HO/WZ/Cir-11/2015
8. Date of GHMC plan Approval 13.03.2015
9. Date of start of construction 2005
10. Date of completion of construction 2016
11. Application to SEIAA, AP 27.07.2013
12. Letter vide No. SEIAA/AP/RRD-2013-3786
13. SEIAA, Andhra Pradesh letter dated 25.09.2013
14. Court case filed by Department of
Environment
May 2016
15. Name of the court IV AJCJ – CUM – XXV
Metropolitan Magistrate,
Cyberabad, Kukatpally,
Miyapur
16. Court Case No. 1082/2016
17. Status of the court case Court case was cleared on
31.08.2016
18. Court order Penalty of Rs. 30,000/- was
paid by the project proponent
ANNEXURE – A3
PROJECT PROPONENT : Shanta Sriram Construction Pvt. Ltd
PROJECT NAME : Shanta Sriram – Tech Park
LOCATION : Gachibowli Village, Serilingampally
Mandal, Ranga Reddy District, Telangana
SUBJECT : Facilities of the project
COMMERCIAL COMPLEX SHANTA SRIRAM – TECH PARK
A. FACILITIES OF THE PROJECT
S.No Description Height of the Building (m)
1. IT Office 30
B. LAND USE BREAK-UP
S.No Description Area (Sq.m) Area (Acres) Percentage (%)
1. Ground coverage 3499.92 0.86 41.69
2. Internal road 3768.09 0.94 44.87
3. Open Space Reserves (OSR)
813.00 0.20 9.68
4. Area left for road widening
314.93 0.07 3.76
5. Total 8395.94 2.07 100.00
C. BUILT-UP AREA
S.No Description Block A & B (Sq.m)
1. Basement – 1 6200.00
2. Basement – 2 6270.00
3. Basement – 3 6340.00
4. Ground Floor 3679.58
5. First Floor 3828.98
6. Second Floor 4341.57
7. Third Floor 4341.57
8. Fourth Floor 4341.57
9. Fifth Floor 4341.57
10. Sixth Floor 4341.57
11. Seventh Floor 4341.57
Total 52367.98
D. PARKING DETAILS
BLOCK „A‟ & „B‟ S.No Description Two Wheeler Four Wheeler
1. Basement – 1 65 120
2. Basement – 2 80 110
3. Basement – 3 80 115
Total 225 570
PROPOSED EXISTING
DISMENTLE SCALE 1: 100 M
REFERENCESREFERENCES
BUILDERS SIGNATUREENGINEER SIGNATUREARCHITECT SIGNATURE
D.G.P.A. HOLDER SIGNATURE
AREA DETAILS :
LOCATION PLANNOT TO SCALE
DUCT
PROPOSED
BUILDING
PROPOSED
BUILDING
DUCT
19.36 Smt
30' WIDE ROAD30' WIDE ROAD
130.00 smt
30
' W
IDE
RO
AD
180.00 smt
30' WIDE ROAD
OSR
53.00 smt
SIDE OPEN SPACE
SIDE OPEN SPACE
SIDE OPEN SPACESIDE OPEN SPACE
RE
AR
O
PE
N S
PA
CE
FR
ON
T O
PE
N S
PA
CE
EF
F.
UN
DE
R R
OA
D W
IDE
NIN
G A
RE
A :
31
4.9
3 S
mt
450.00 smt
15.00 [49'-2 1/2"]
14.00 [45'-11"]
8.0411.81
5.6
8
17.23
8.00
8.0
0
8.7
3
8.0
7
11.8
0
3.71
19.44
25.0
8 [
82'-
3 1
/2"]
26.92 [88'-4"]13.23 [43'-5"]
7.51 [24'-7 1/2"]23.35 [76'-7 1/2"]
17.13 [56'-2"]
3.46
14.00 [45'-11"]
19.11 [62'-8 1/2"]
7.48 [24'-6 1/2"]
64.5830.33
8.2
7
27.44
16.65
7.91
15.21
16.49
8.7
5
9.1
1
8.0
4
8.4
7
0.9
0
23.36
2.3
1
31.0
9
10.00
1.9
0
11.17
2.4
5
10.771.56 11.24
1.3
8 5.15
0.5
5
5.74
0.9
8
10.46
0.4
6 5.59
1.3
0 4.65
8.1
25.6
9
9.10
9.69
8.2
0
8.0
0
11.23 [36'-10"]
11.61 [38'-1"]
11.48 [37'-8"]
5.55 [18'-2 1/2"]
4.44 [14'-7"]16.41 [53'-10"]
4.8
5 [1
5'-1
1"]
4.3
7 [
14'-
4"]
2.1
1
13.45 [44'-1 1/2"]
14.6
2 [
47'-
11 1
/2"]
7.6
0 [
24'-
11"]
43.44 [142'-6 1/2"]
25.54 [83'-9 1/2"]
8.06 [26'-5"] 5.64 [18'-6"] 4.62 [15'-2"]10.01 [32'-10"]
7.91 [25'-11 1/2"]7.86 [25'-9 1/2"]
8.07 [26'-5 1/2"]7.78 [25'-6 1/2"] 7.82 [25'-8"]
7.75 [25'-5"]7.83 [25'-8 1/2"]
8.43 [27'-8"]
9.02 [29'-7"]7.04 [23'-1"]
9.08 [29'-9 1/2"]7.63 [25'-0 1/2"]
7.48 [24'-6 1/2"]6.62 [21'-8 1/2"]2.347.50 [24'-7"]2.782.742.730.73
7.63 [25'-0 1/2"]7.77 [25'-5 1/2"]7.80 [25'-7"]4.78 [15'-8"]3.047.83 [25'-8 1/2"]
7.67 [25'-2"]7.84 [25'-8 1/2"]2.945.68 [18'-7 1/2"]8.46 [27'-9"]10.05 [32'-11 1/2"]10.50 [34'-5 1/2"]
11.04 [36'-2 1/2"]
0.7
5
6.68 0.90
6.89
8.0
0
8.00
8.0
3
2.533.20
4.88
1.98 [6'-6"]
1.9
0
12.10
SITE PLAN
PLAN OF EXISTING OFFICE BUILDING SHANTA SRIRAM - TECH PARK
IN SURVEY NO : 126,
SITUATED AT GACHIBOWLI VILLAGE,
SERILINGAMPALLY MANDAL,
RANGA REDDY (DIST)., TELANGANA.
NORTH
9.70
GACHIBOWLI
STADIUM
TO SHAMSHABAD EXPRESS
WAY ROAD
GACHIBOWLI 'X' ROADS
TO ISB & MICRO SOFT ROAD
BO
TA
NIC
AL
GA
RD
EN
DL
F C
YB
ER
CIT
Y
ROAD
IIIT
CA
MP
US
TO
H
YD
ER
AB
AD
C
EN
TR
AL
UN
IVE
RS
ITY
TCS SYNERGY PARK
OP
EN
PL
OT
SITE
ROAD
TO KONDAPUR ROAD
RO
AD
TO
TO
LIC
HO
WK
I
OPEN PLOT
OSR
OSR
OSR
S.No Description Area (Sq.m) Area (Acres) Percentage (%)1. Ground coverage 3499.92 0.86 41.69
2. Internal road 3768.09 0.94 44.87
3. Open Space Reserves (OSR)
813.00 0.20 9.68
4. Area left for road widening
314.93 0.07 3.76
5. Total 8395.94 2.07 100.00
S.No Description Block A & B (Sq.m)
1. Basement 1 6200.00
2. Basement 2 6270.00
3. Basement 3 6340.00
4. Ground Floor 3679.58
5. First Floor 3828.98
6. Second Floor 4341.57
7. Third Floor 4341.57
8. Fourth Floor 4341.57
9. Fifth Floor 4341.57
10. Sixth Floor 4341.57
11. Seventh Floor 4341.57
Total 52367.98
BLOCK 'A' & 'B'
S.No Description Two Wheeler Four Wheeler
1. Basement 1 65 120
2. Basement 2 80 110
3. Basement 3 80 115
Total 225 570
PARKING DETAILS
BUILT-UP AREA
LAND USE BREAK-UP
PROJECT DEVELOPER
SHANTA SRIRAM CONSTRUCTIONS PVT. LTD
501, Oasis Centre, Somajiguda,
Begumpet Main Road, Opp. Pullareddy Sweets,
PLAN OF SHANTA SRIRAM - TECH PARK, GACHIBOWLI VILLAGE, SERILINGAMPALLY MANDAL, RANGA REDDY DISTRICT, TELANGANA.
SCALE:-1:200
AN
NE
XU
RE
- A5
LOCATION MAP
INDIA
Wa ra n ga l
TELANGANA
Na lgon da
Kh a m m a m
Adila ba d
Ka rim n a ga rNiza m ba d
Me da k
Ra n ga re dd i
Ma h a bu bn a ga r
LEGEND
RAILWAY TRACK
RIVER
ROAD
DIS TRICT BOUNDARY
S TATE HIGHWAY
TALUK HEADQUARTER
DIS TRICT HEADQUARTER
TOWN
S TREAMS
NATIONAL HIGHWAY
PROJECT S ITERANGA REDDY DISTRICT
Ve n ka ta pu ra m
Ma ilwa rra m
Mirya n
Tandur
S h a h a ba dPargi
Ma rka lNa n ch e rla
Mu h a m m a da ba d
Dom a
Mora n gpa lli
Pe dda m a l
Ela l
Kote pa lli
Pa t lu r
Ma rpa lli
Ch a n gom a l
Chevella
S h a n ka rpa lli
Vikarabad
Ibrahimpatanam
Ya ch a ra m
Ma is a ra m
Bola ra mMa u la Ali
Medchal
HYDERABAD
Tu kku gu da
S e cu n de ra ba dGu n d ipe t
Golkon da
7
7
9
7& 9
Hu s a inS a ga r
PROJECT SITE
ANNEXURE - A6
N
Note : - Not to s ca le
N
Kazipet Jn.134.5 km
To
25.7 km
To
Sangareddi
Hyderabad8.7 km
To
Wadi153.0 km
To
Bolarum9.1 km
To
PROJECT SITE PREPARED BY
S ECUNDERABAD
SHOWING 10 km RADIUS
TOPOGRAPHICAL MAP
AN
NE
XU
RE
- A7
M/s. SHANTA SRIRAM CONSTRUCTIONS PVT. LTD., CLIENT :
TITLE :
Ga ch ibowli Villa ge , S e rilin ga m pa lly Ma n da l, Ra n ga Re ddy Dis t r ict , Te la n ga n a .
PROJECT :
PROJECT S ITE
S CALE
3
S u rve y of In d ia Topos h e e t s
5 67
K
5 66
K
5 68
K
5 63
K
5 62
K
5 64
K
5 61 0
K
5 61 1
K
5 61 2
K
In de x to
0 6 km
REFER TO THIS MAP AS : - 1 : 5 0 ,0 0 0
Pu b lis h e d u n de r th e d ire ct ion of
S HEET 5 6 K / 7 FIRS T EDITION
th e S u rve yor Ge n e ra l of In d ia - 2 0 1 2
LEGEND
AN
NE
XU
RE
- A8
500 m GOOGLE MAP FOR THE PROJECT
PROJECT SITE
GOOGLE EARTH IMAGERY FOR THE PROJECT SITEA
NN
EX
UR
E - A
9
ANNEXURE – A10
PROJECT PROPONENT : Shanta Sriram Construction Pvt. Ltd
PROJECT NAME : Shanta Sriram – Tech Park
LOCATION : Gachibowli Village, Serilingampally
Mandal, Ranga Reddy District, Telangana
SUBJECT : Salient features of the project
A. LAND REQUIREMENT
S.No Description Details
1. The area of the project will be 2.07 Acres
2. Total plot area Sq.m 8395.94
3. Built-up area Sq.m 52367.98
4. Parking area Sq.m 18810.00
5. Two wheeler Nos. 225
6. Four wheeler Nos. 570
B. FACILITIES OF THE BUILDING
S. No. Description Height of the Building (m)
1. 1. IT building 30
C. WATER REQUIREMENT
S.No Item Details
7. Source of water: Hyderabad Metropolitan Water Supply & Sewerage Board (HMWS&SB)/Private tankers
8. Operation phase klpd 205
9. Fresh water klpd 205
10. Wastewater generation klpd 154
11. STP Capacity klpd 175
12. Treated wastewater klpd 115
S.No Item Details
13. Source of electricity Telangana Southern Power Distribution Company Limited (TSSPDCL)
14. TSSPDCL kVA Operation phase
3400
15. DG sets for power backup
kVA 2500
16. Fuel requirement Litres per hour
444.77
17. DG sets Number 2 x 1250
D. SOLID WASTE GENERATION
COMMERCIAL COMPLEX
S. No. Description Number of units
Number of persons/unit
Total number of persons
1. Block A 1 2606 2606
2. Block B 1 1116 1116
Total persons 3722
S.No Description IT Offices
1. Based on solid waste generation rates in the urban areas, it is estimated per person
0.2 kg
2. Total persons 3722
3. Total waste generation in kg 744
4. Organic waste in kg (55%) 409
5. In-organic waste in kg (45%) 335
S.No. Waste Disposal Details
1. Organic waste Organic wastes will be disposed to local municipal authorities
2. Inorganic waste Inorganic wastes will be disposed to authorize vendors for recycling
ANNEXURE – A11
PROJECT PROPONENT : Shanta Sriram Construction Pvt. Ltd
PROJECT NAME : Shanta Sriram – Tech Park
LOCATION : Gachibowli Village, Serilingampally
Mandal, Ranga Reddy District, Telangana
SUBJECT : Water and wastewater balance
A. SOURCE OF WATER : Hyderabad Metropolitan Water Supply &
Sewerage Board (HMWS&SB)/Water tankers B. WATER REQUIREMENT
S.No Description Total no of persons
Drinking (lpd)
Flushing (lpd)
Drinking (klpd)
Flushing (klpd)
Total (klpd)
1. Block – A 2606 5 45 13.03 117.27 130.30
2. Block – B 1116 5 45 5.58 50.22 55.80
3. Visitors (10% Block – A & B)
373 5 45 1.87 16.79 18.66
Sub Total 4095 - - 20.48 184.28 204.76
Total water requirement 205 klpd (Approx.)
WASTEWATER GENERATION
S.No Item Details
1. Total water requirement klpd 205
2. Wastewater generation (75% Domestic and Flushing) (0.75*205 =153.75)
klpd 154
3. Design STP Capacity klpd 175
4. Treated wastewater (75% wastewater generation) (0.75*154 = 115)
klpd 115
TREATED WASTEWATER USAGE
The treated wastewater will be disposed to the existing sewer line
FRESH WATER REQUIREMENT
The fresh water requirement is estimated at 205 klpd
Note: klpd – kilo litres per day lpd – litres per day
–
ANNEXURE – A12
PROJECT PROPONENT : Shanta Sriram Construction Pvt. Ltd
PROJECT NAME : Shanta Sriram – Tech Park
LOCATION : Gachibowli Village, Serilingampally
Mandal, Ranga Reddy District, Telangana
SUBJECT : Power Requirement
S.No Item Details
1. Source of electricity Telangana Southern Power Distribution Company Limited (TSSPDCL)
2. TSSPDCL kVA Construction phase Operation phase
- 3400
3. DG sets for power backup
kVA - 2500
4. Fuel requirement Litres per hour
- 444.77
5. DG sets Number - 2x1250
ENVIRONMENTAL MANAGEMENT PLAN
of
“SHANTA SRIRAM – TECH PARK”
(Commercial Complex)
At Gachibowli Village, Serilingampally Mandal
Ranga Reddy District, Telangana.
MAY – 2017
PROJECT PROPONENT ENVIRONMENT CONSULTANT
SHANTA SRIRAM CONSTRUCTIONS PVT. LTD., Hyderabad, Telangana.
B.S. ENVI-TECH PVT. LTD., Secunderabad, Telangana. NABET Accreditation: NABET/EIA/1316/RA002
TABLE OF CONTENTS
Para No. Content Page No.
Chapter -1 : Introduction
1.0 Shanta Sriram Construction Pvt. Ltd SSCPL) 2
1.1 Government of India – Legislation - Building/Construction Projects/Area Development Projects and Townships
2
1.2 Environmental Management Plan 2
1.3 Present status of the project 3
1.4 Applicable Environmental Standards And Regulations
4
1.5 Location of the project 5
1.6 Resource requirement 6
1.6.1 Construction phase 6
1.6.2 Operation phase 6
Chapter – 2 : Environmental Management Plan
2.1 Environmental Management Plan during Operation phase
8
2.1.1 Water Environment 8
2.1.2 Air Environment 9
2.1.3 Noise Environment 10
2.1.4 Storm Water Management 10
2.1.5 Greenbelt development 10
2.1.6 Solid Waste Generation 10
2.1.7 Energy Conservation 11
2.1.8 Fire Fighting devices 11
LIST OF TABLES
Table No. Title Page No.
1 Facilities of the project 3
2 Details of Land use Break-up 3
3 Details of Built-up Area 3
4 Details of Parking 4
5 Co-ordinates of the project site 5
6 Sewage Treatment Plant (Design Basis) 9
7 Details of Fire-fighting devices 11
LIST OF FIGURES
Fig. No. Title Page No.
1 Perspective view of the building 4
2 Location map of the project site 5
3 Study area of 10 km radius around the project site 5
4 2 km Radius Map for the project site 5
5 Google Earth Imagery for the project site 5
6 Master plan of the project 8
Shanta Sriram – Tech Park Gachibowli Village, Serilingampally Mandal, Ranga Reddy District, Telangana.
EMP Report
Project proponent
Shanta Sriram Construction Pvt. Ltd 2 B.S. Envi-Tech (P) Ltd., Sec’bad.
CHAPTER – 1: INTRODUCTION
1.0 SHANTA SRIRAM CONSTRUCTION PRIVATE LIMITED (SSPCL)
SSPCL constructed a commercial complex titled “SHANTA SRIRAM – TECH PARK” on a plot area of 2.07 Acres (8395.94 Sq.m) at Survey
Nos. 126, Gachibowli Village, Serilingampally Mandal, Ranga Reddy
District, Telangana. This project is a violation case. A court case was
filed by Telangana Pollution Control Board in the year 2016. The
judgement was declared on 31.08.2016 with a penalty.
1.1 GOVERNMENT OF INDIA – LEGISLATION -
BUILDING/CONSTRUCTION PROJECTS/AREA DEVELOPMENT
PROJECTS AND TOWNSHIPS
Government of India, Ministry of Environment, Forests and Climate
Change (MoEF&CC) New Delhi has issued an Environmental Impact
Assessment (EIA) Notification SO 1533, on 14th Sep 2006 and
Amendments thereof. As per the notification, all building/construction
projects/area development projects and townships are identified as
Category ‘B’ project which necessitates obtaining the Environmental
Clearance (EC). The notification has exempted the above
establishment from holding the Public Hearing.
1.2 ENVIRONMENTAL MANAGEMENT PLAN
Towards complying with above statutory requirements of MoEF&CC,
SSCPL proposes to obtain the Environmental clearance for its
completed commercial complex titled “Shanta Sriram – Tech Park”
at Survey No. 126, Gachibowli Village, Serilingampally Mandal, Ranga
Reddy District, Telangana.
Shanta Sriram – Tech Park Gachibowli Village, Serilingampally Mandal, Ranga Reddy District, Telangana.
EMP Report
Project proponent
Shanta Sriram Construction Pvt. Ltd 3 B.S. Envi-Tech (P) Ltd., Sec’bad.
1.3 PRESENT STATUS OF THE PROJECT
SSCPL already constructed the commercial complex titled “Shanta
Sriram – Tech Park” at Survey No. 126, Gachibowli Village,
Serilingampally Mandal, Ranga Reddy District, Telangana at an
estimated project cost of Rs. 150 Crores.
Total Plot area of the project is 2.07 Acres with built-up area of
52367.98 Sq.m. The projects have IT office and Services.
TABLE – 1
A. FACILITIES OF THE PROJECT
S. No. Description Height of the Building (m)
1. IT Office 30
TABLE – 2
B. DETAILS OF LAND USE BREAK-UP
S.No Description Area (Sq.m) Area (Acres) Percentage (%)
1. Ground coverage 3499.92 0.86 41.69
2. Internal road 3768.09 0.94 44.87
3. Open Space Reserves (OSR)
813.00 0.20 9.68
4. Area left for road widening
314.93 0.07 3.76
5. Total 8395.94 2.07 100.00
TABLE – 3
C. DETAILS OF BUILT-UP AREA
S.No Description Block A & B (Sq.m)
1. Basement – 1 6200.00
2. Basement – 2 6270.00
3. Basement – 3 6340.00
4. Ground Floor 3679.58
5. First Floor 3828.98
6. Second Floor 4341.57
7. Third Floor 4341.57
8. Fourth Floor 4341.57
9. Fifth Floor 4341.57
10. Sixth Floor 4341.57
11. Seventh Floor 4341.57
Total 52367.98
Shanta Sriram – Tech Park Gachibowli Village, Serilingampally Mandal, Ranga Reddy District, Telangana.
EMP Report
Project proponent
Shanta Sriram Construction Pvt. Ltd 4 B.S. Envi-Tech (P) Ltd., Sec’bad.
TABLE – 4
D. DETAILS OF PARKING
BLOCK „A‟ AND BLOCK „B‟ S.No Description Two Wheeler Four Wheeler
1. Basement – 1 65 120
2. Basement – 2 80 110
3. Basement – 3 80 115
Total 225 570
Parking Area: 18810.00 Sq.m
FIG – 1 depicts the perspective view of the Shanta Sriram - Tech Park
1.4 APPLICABLE ENVIRONMENTAL STANDARDS AND REGULATIONS
With respect to prevention and control of environmental pollution, the
project is governed by the following Acts and Rules of MoEF&CC:
Water (Prevention and Control of Pollution) Act, 1974 as amended
in 1978 and 1988;
Air (Prevention and Control of Pollution) Act, 1981 as amended
in 1987;
Environment (Protection) Act, 1986 amended 1991 and
Environment (Protection) rules, 1986 and amendments thereafter;
Hazardous Waste (Management & Handling) Rules, 1989, as
amended in 2000, 2003, 2008, 2011 and 2013.
Municipal Solid Wastes (Management and Handling) Rules, 2000
as amended in 2016.
The Noise Pollution (Regulation and Control) Rules, 2000 and as
amended in 22.11.2000.
FIG - 1
PHOTOGRAPHS SHOWING THE PROJECT
Shanta Sriram – Tech Park Gachibowli Village, Serilingampally Mandal, Ranga Reddy District, Telangana.
EMP Report
Project proponent
Shanta Sriram Construction Pvt. Ltd 5 B.S. Envi-Tech (P) Ltd., Sec’bad.
1.5 LOCATION OF THE PROJECT
The project site is a part of the Survey of India Toposheet No.
No.56/K/7. The site falls
TABLE – 5
CO-ORDINATES OF THE PROJECT SITE
(A) 17°26'46.47"N - 78°21'19.69"E (H) 17°26'50.04"N - 78°21'13.62"E
(B) 17°26'47.87"N - 78°21'17.13"E (I) 17°26'49.12"N - 78°21'17.68"E
(C) 17°26'49.81"N - 78°21'12.88"E (J) 17°26'48.21"N - 78°21'19.67"E
(D) 17°26'50.28"N - 78°21'12.16"E (K) 17°26'47.85"N - 78°21'20.04"E
(E) 17°26'51.04"N - 78°21'12.65"E (L) 17°26'47.36"N - 78°21'19.79"E
(F) 17°26'50.77"N - 78°21'13.14"E (M) 17°26'47.01"N - 78°21'19.90"E
(G) 17°26'50.46"N - 78°21'13.18"E
The average altitude of project site is 597 m above MSL.
Nearest railway line connecting Kazipet Jn - Wadi of South Central
Railway line is located at a distance of 3.9 km to NNE direction from
the site. Musi River is at a distance of 7.0 km in S direction. Hussain
Sagar is at a distance of 11.6 km in ESE direction.
The National Highway (NH-9) connecting Sangareddi – Hyderabad is
located at a distance of about 5.1 km in N, & The National Highway
(NH-7) connecting Kurnool – Hyderabad is located at a distance of
about 15.0 km in SE Direction, The nearest railway station is located
at Hi Tech City RS which is 4.1 km in NE direction.
FIG – 2 LOCATION MAP FOR THE PROJECT SITE
FIG – 3 STUDY AREA OF 10km RADIUS AROUND PROJECT SITE
FIG – 4 2km RADIUS MAP FOR THE PROJECT SITE
FIG – 5 GOOGLE EARTH IMAGERY FOR THE PROJECT SITE
Kasu Brahmananda Reddy National Park is at a distance of 6.8 km in
ESE direction with respect to the project site. Nehru Zoological
Park is at a distance of 14.0 km in SE with respect to the project
site.
Golconda Fort is at a distance of 8.5 km in SSE direction. Qutub
Shahi Tombs is at a distance of 7.0 km in SSE direction. Charminar is
LOCATION MAP
INDIA
Wa ra n ga l
TELANGANA
Na lgon da
Kh a m m a m
Adila ba d
Ka rim n a ga rNiza m ba d
Me da k
Ra n ga re dd i
Ma h a bu bn a ga r
LEGEND
RAILWAY TRACK
RIVER
ROAD
DIS TRICT BOUNDARY
S TATE HIGHWAY
TALUK HEADQUARTER
DIS TRICT HEADQUARTER
TOWN
S TREAMS
NATIONAL HIGHWAY
PROJECT S ITERANGA REDDY DISTRICT
Ve n ka ta pu ra m
Ma ilwa rra m
Mirya n
Tandur
S h a h a ba dPargi
Ma rka lNa n ch e rla
Mu h a m m a da ba d
Dom a
Mora n gpa lli
Pe dda m a l
Ela l
Kote pa lli
Pa t lu r
Ma rpa lli
Ch a n gom a l
Chevella
S h a n ka rpa lli
Vikarabad
Ibrahimpatanam
Ya ch a ra m
Ma is a ra m
Bola ra mMa u la Ali
Medchal
HYDERABAD
Tu kku gu da
S e cu n de ra ba dGu n d ipe t
Golkon da
7
7
9
7& 9
Hu s a inS a ga r
PROJECT SITE
N
Note : - Not to s ca le
FIG - 2
N
Kazipet Jn.134.5 km
To
25.7 km
To
Sangareddi
Hyderabad8.7 km
To
Wadi153.0 km
To
Bolarum9.1 km
To
PROJECT SITE PREPARED BY
S ECUNDERABAD
SHOWING 10 km RADIUS
TOPOGRAPHICAL MAP
M/s. SHANTA SRIRAM CONSTRUCTIONS PVT. LTD., CLIENT :
TITLE :
Ga ch ibowli Villa ge , S e rilin ga m pa lly Ma n da l, Ra n ga Re ddy Dis t r ict , Te la n ga n a .
PROJECT :
PROJECT S ITE
S CALE
3
S u rve y of In d ia Topos h e e t s
5 67
K
5 66
K
5 68
K
5 63
K
5 62
K
5 64
K
5 61 0
K
5 61 1
K
5 61 2
K
In de x to
0 6 km
REFER TO THIS MAP AS : - 1 : 5 0 ,0 0 0
Pu b lis h e d u n de r th e d ire ct ion of
S HEET 5 6 K / 7 FIRS T EDITION
th e S u rve yor Ge n e ra l of In d ia - 2 0 1 2
LEGEND
FIG - 3
N
PREPARED BY
S ECUNDERABAD
SHOWING 2 km RADIUS
TOPOGRAPHICAL MAP
FIG - 4M/s. SHANTA SRIRAM CONSTRUCTIONS PVT. LTD.,
CLIENT :
TITLE :
Ga ch ibowli Villa ge , S e rilin ga m pa lly Ma n da l, Ra n ga Re ddy Dis t r ict , Te la n ga n a .
PROJECT :
PROJECT S ITE
S CALE
1
S u rve y of In d ia Topos h e e t s
5 67
K
5 66
K
5 68
K
5 63
K
5 62
K
5 64
K
5 61 0
K
5 61 1
K
5 61 2
K
In de x to
0 2 km
REFER TO THIS MAP AS : - 1 : 5 0 ,0 0 0
Pu b lis h e d u n de r th e d ire ct ion of
S HEET 5 6 K / 7 FIRS T EDITION
th e S u rve yor Ge n e ra l of In d ia - 2 0 1 2
LEGEND
PROJECT SITE
PROJECT SITE
GOOGLE EARTH IMAGERY FOR THE PROJECT SITEF
IG - 5
Shanta Sriram – Tech Park Gachibowli Village, Serilingampally Mandal, Ranga Reddy District, Telangana.
EMP Report
Project proponent
Shanta Sriram Construction Pvt. Ltd 6 B.S. Envi-Tech (P) Ltd., Sec’bad.
at a distance of 15.8 km in SE direction. Birla Temple is at a distance
of 12.9 km in ESE direction.
Nearest Settlements from the Project Site
Kottaguda – 1.8 km – NE
Siddiquinagar – 1.0 km – ENE
Gachibauli – 0.7 km – SE
Indiranagar – 0.8 km - S
Nearest Reserve Forests from the Project Site Kottaguda RF is at a
distance of 0.2 km from the site at N direction and Chilkur PF – 9.0
km Southern Direction.
1.6 RESOURCE REQUIREMENT
1.6.1 CONSTRUCTION PHASE
The project has already been constructed
1.6.2 OPERATION PHASE
The following are the major requirements in the operation phase:
A POWER
About 3400 kVA of power will be required for the project and will be
sourced from the TSSPDCL. During periods of power outages, the
emergency power will be supplied through two standby DG sets each
of 1250 kVA.
B WATER SUPPLY
The total water requirement of the project during operation phase is
estimated to be 205 kld.
The fresh water requirement is estimated at 205 kld will be met from
(HMWSSB)/Water tankers.
Shanta Sriram – Tech Park Gachibowli Village, Serilingampally Mandal, Ranga Reddy District, Telangana.
EMP Report
Project proponent
Shanta Sriram Construction Pvt. Ltd 7 B.S. Envi-Tech (P) Ltd., Sec’bad.
C SEWAGE TREATMENT PLANT
The estimated wastewater is 154 kld which is treated in STP of 175
kld capacity. 115 kld will be a treated wastewater from the STP. This
treated wastewater from the STP will be disposed to the existing sewer
line.
D MANPOWER
The project will provide direct employment to the about 5 people and
indirect employment for 30 peoples for service providers/facility
management.
Shanta Sriram – Tech Park Gachibowli Village, Serilingampally Mandal, Ranga Reddy District, Telangana.
EMP Report
Project proponent
Shanta Sriram Construction Pvt. Ltd 8 B.S. Envi-Tech (P) Ltd., Sec’bad.
CHAPTER – 2: ENVIRONMENTAL MANAGEMENT PLAN
Environmental Management Plan of the project has been formulated
keeping in view of current Environmental guidelines standard for
Building Projects provided by Ministry of Environmental, Forests and
Climate Change (MoEF&CC) and Telangana State Pollution Control
Board (TSPCB).
The following mitigation measures are in order to synchronize the
development of the project with the environmental protection. The
construction phase impacts are mostly short term, restricted to the
plot area and not envisaged on the larger scale. In the operation phase
the environmental impacts are due to operation of the project and
hence, the emphasis in the Environment Management Plan (EMP) is to
minimize such impacts.
FIG – 6 Master plan of the project
Following sections describe the environment management plan for
operation phases.
2.1 ENVIRONMENTAL MANAGEMENT PLAN DURING OPERATION
PHASE
The Environmental Management Plan to be implemented during
operation phase is discussed under the following heads
a. Water Environment
b. Air environment
c. Noise Environment
d. Solid waste generation
Details of management plan of each environmental component are
given below:
2.1.1 WATER ENVIRONMENT
WATER CONSUMPTION AND WASTEWATER GENERATION
Total water consumption in the operation phase is about 205 kld. Of
this, about 154 kld is the wastewater generation from the project.
PROPOSED EXISTING
DISMENTLE SCALE 1: 100 M
REFERENCESREFERENCES
BUILDERS SIGNATUREENGINEER SIGNATUREARCHITECT SIGNATURE
D.G.P.A. HOLDER SIGNATURE
AREA DETAILS :
LOCATION PLANNOT TO SCALE
DUCT
PROPOSED
BUILDING
PROPOSED
BUILDING
DUCT
19.36 Smt
30' WIDE ROAD30' WIDE ROAD
130.00 smt
30
' W
IDE
RO
AD
180.00 smt
30' WIDE ROAD
OSR
53.00 smt
SIDE OPEN SPACE
SIDE OPEN SPACE
SIDE OPEN SPACESIDE OPEN SPACE
RE
AR
O
PE
N S
PA
CE
FR
ON
T
OP
EN
S
PA
CE
EF
F.
UN
DE
R R
OA
D W
IDE
NIN
G A
RE
A :
31
4.9
3 S
mt
450.00 smt
15.00 [49'-2 1/2"]
14.00 [45'-11"]
8.0411.81
5.6
8
17.23
8.00
8.0
0
8.7
3
8.0
7
11.8
0
3.71
19.44
25.0
8 [
82'-
3 1
/2"]
26.92 [88'-4"]13.23 [43'-5"]
7.51 [24'-7 1/2"]23.35 [76'-7 1/2"]
17.13 [56'-2"]
3.46
14.00 [45'-11"]
19.11 [62'-8 1/2"]
7.48 [24'-6 1/2"]
64.5830.33
8.2
7
27.44
16.65
7.91
15.21
16.49
8.7
5
9.1
1
8.0
4
8.4
7
0.9
0
23.36
2.3
1
31.0
9
10.00
1.9
0
11.17
2.4
5
10.771.56 11.24
1.3
8 5.15
0.5
5
5.74
0.9
8
10.46
0.4
6 5.59
1.3
0 4.65
8.1
25.6
9
9.10
9.69
8.2
0
8.0
0
11.23 [36'-10"]
11.61 [38'-1"]
11.48 [37'-8"]
5.55 [18'-2 1/2"]
4.44 [14'-7"]16.41 [53'-10"]
4.8
5 [1
5'-1
1"]
4.3
7 [
14'-
4"]
2.1
1
13.45 [44'-1 1/2"]
14.6
2 [
47'-
11 1
/2"]
7.6
0 [
24'-
11"]
43.44 [142'-6 1/2"]
25.54 [83'-9 1/2"]
8.06 [26'-5"] 5.64 [18'-6"] 4.62 [15'-2"]10.01 [32'-10"]
7.91 [25'-11 1/2"]7.86 [25'-9 1/2"]
8.07 [26'-5 1/2"]7.78 [25'-6 1/2"]
7.82 [25'-8"]7.75 [25'-5"]
7.83 [25'-8 1/2"]8.43 [27'-8"]
9.02 [29'-7"]7.04 [23'-1"]
9.08 [29'-9 1/2"]7.63 [25'-0 1/2"]
7.48 [24'-6 1/2"]6.62 [21'-8 1/2"]2.347.50 [24'-7"]2.782.742.730.737.63 [25'-0 1/2"]7.77 [25'-5 1/2"]7.80 [25'-7"]4.78 [15'-8"]
3.047.83 [25'-8 1/2"]
7.67 [25'-2"]7.84 [25'-8 1/2"]2.945.68 [18'-7 1/2"]8.46 [27'-9"]10.05 [32'-11 1/2"]10.50 [34'-5 1/2"]
11.04 [36'-2 1/2"]
0.7
5
6.68 0.90
6.89
8.0
0
8.00
8.0
3
2.533.20
4.88
1.98 [6'-6"]
1.9
0
12.10
SITE PLAN
PLAN OF EXISTING OFFICE BUILDING SHANTA SRIRAM - TECH PARK
IN SURVEY NO : 126,
SITUATED AT GACHIBOWLI VILLAGE,
SERILINGAMPALLY MANDAL,
RANGA REDDY (DIST)., TELANGANA.
NORTH
9.70
GACHIBOWLI
STADIUM
TO SHAMSHABAD EXPRESS
WAY ROAD
GACHIBOWLI 'X' ROADS
TO ISB & MICRO SOFT ROAD
BO
TA
NIC
AL
GA
RD
EN
DL
F C
YB
ER
CIT
Y
ROAD
IIIT
CA
MP
US
TO
H
YD
ER
AB
AD
C
EN
TR
AL
UN
IVE
RS
ITY
TCS SYNERGY PARK
OP
EN
PL
OT
SITE
ROAD
TO KONDAPUR ROAD
RO
AD
TO
TO
LIC
HO
WK
I
OPEN PLOT
OSR
OSR
OSR
S.No Description Area (Sq.m) Area (Acres) Percentage (%)1. Ground coverage 3499.92 0.86 41.692. Internal road 3768.09 0.94 44.87
3. Open Space Reserves (OSR)
813.00 0.20 9.68
4. Area left for road widening
314.93 0.07 3.76
5. Total 8395.94 2.07 100.00
S.No Description Block A & B (Sq.m)
1. Basement 1 6200.00
2. Basement 2 6270.00
3. Basement 3 6340.00
4. Ground Floor 3679.58
5. First Floor 3828.98
6. Second Floor 4341.57
7. Third Floor 4341.57
8. Fourth Floor 4341.57
9. Fifth Floor 4341.57
10. Sixth Floor 4341.57
11. Seventh Floor 4341.57
Total 52367.98
BLOCK 'A' & 'B'
S.No Description Two Wheeler Four Wheeler
1. Basement 1 65 120
2. Basement 2 80 110
3. Basement 3 80 115
Total 225 570
PARKING DETAILS
BUILT-UP AREA
LAND USE BREAK-UP
PROJECT DEVELOPER
SHANTA SRIRAM CONSTRUCTIONS PVT. LTD
501, Oasis Centre, Somajiguda,
Begumpet Main Road, Opp. Pullareddy Sweets,
PLAN OF SHANTA SRIRAM - TECH PARK, GACHIBOWLI VILLAGE, SERILINGAMPALLY MANDAL, RANGA REDDY DISTRICT, TELANGANA.
SCALE:-1:200
FIG
- 6
Shanta Sriram – Tech Park Gachibowli Village, Serilingampally Mandal, Ranga Reddy District, Telangana.
EMP Report
Project proponent
Shanta Sriram Construction Pvt. Ltd 9 B.S. Envi-Tech (P) Ltd., Sec’bad.
The following are the typical characteristics of the wastewater
considered for design of STP:
TABLE – 6
SEWAGE TREATMENT PLANT (DESIGN BASIS)
S.No
Parameter
Input Characteristics
Output Characteristics
1 pH 7 – 8 6.5 – 8.5
2 Biological Oxygen Demand
(BOD), @20C, mg/l
200 – 350 <30
3 Chemical Oxygen Demand (COD) mg/l
350 – 450 <100
4 Total Suspended Solids (TSS), mg/l
350 – 450 <30
5 Oil and Grease, mg/l 100 – 150 <10
The wastewater generated from the Shanta Sriram - Tech Park will be
collected through network of pipes. The collected wastewater will be
routed to the sewage treatment plant of 175 kld capacity. The treated
wastewater will be disposed to existing sewer line.
2.1.2 AIR ENVIRONMENT
The impact on air environment in the operation phase will be mainly
due to the following
a. Vehicular movement
b. Operation of the DG sets which are the emergency power supply
units
Vehicular movement
The emission from vehicular movement is mainly from the exhaust of
two and four wheelers.
Operation of the emergency power supply units - DG sets
2 Nos. 1250 kVA will be provided as emergency power supply.
The following measures will be implemented for control of air pollution
Shanta Sriram – Tech Park Gachibowli Village, Serilingampally Mandal, Ranga Reddy District, Telangana.
EMP Report
Project proponent
Shanta Sriram Construction Pvt. Ltd 10 B.S. Envi-Tech (P) Ltd., Sec’bad.
DG sets will be operated only during emergency and are not in
continuous operation.
CPCB approved DG sets conforming to noise and emission
standard will be provided.
2.1.3 NOISE ENVIRONMENT
DG sets will be provided with acoustic enclosure conforming to CPCB
norms. Noise levels will be checked periodically using a noise pressure
level meter.
2.1.4 STORM WATER MANAGEMENT
Rain water from the roof, paved area and unpaved area will be
connected to the storm water drain at ground level.
2.1.5 GREENBELT DEVELOPMENT
No provision for greenbelt development has been made inside the
premises.
2.1.6 SOLID WASTE GENERATION
The solid waste generation from the project in the operation phase is
mainly from the following areas:
a. Domestic Solid waste
b. Solid waste from sewage treatment plant
Domestic solid waste including Garbage
The solid wastes generated during operation phase will consist of
mainly papers, cartons, thermocol, plastics, polythene bags, glass,
waste vegetables and foods etc. The quantity of solid waste generated
from the Shanta Sriram - Tech Park is 744 kg/day
The inorganic wastes will be disposed to authorized vendors for
recycling and the organic wastes will be disposed to local municipal
authorities.
Sludge from waste-water treatment
Shanta Sriram – Tech Park Gachibowli Village, Serilingampally Mandal, Ranga Reddy District, Telangana.
EMP Report
Project proponent
Shanta Sriram Construction Pvt. Ltd 11 B.S. Envi-Tech (P) Ltd., Sec’bad.
The STP sludge will be conditioned and dried. The dried sludge cakes
will be disposed to the local vendors.
Shanta Sriram – Tech Park Gachibowli Village, Serilingampally Mandal, Ranga Reddy District, Telangana.
EMP Report
Project proponent
Shanta Sriram Construction Pvt. Ltd 12 B.S. Envi-Tech (P) Ltd., Sec’bad.
2.1.7 ENERGY CONSERVATION
The following energy conservation measures are provided in the
building
LED/CFL lighting fixtures are provided in common areas.
Solar fencing is provided on the one side wall of the compound
2.1.8 FIRE FIGHTING DEVICES
Fire-fighting measures in the project are as follow:
TABLE - 7
1. Fire Extinguishers 511 2. Hose reel system 55 3. Wet riser 5 4. Automatic detection system 602 5. Automatic Sprinkler system 3170 6. Yard Hydrant system 12 7. Manual Call point
(Fire Alarm systems) 55
8. Underground static water tank 1,00,000 litres 9. Terrace tank 20,000 litres
The project received the NOC from the Fire Department.
Shanta Sriram – Tech Park Gachibowli Village, Serilingampally Mandal, Ranga Reddy District, Telangana.
EMP Report
Project proponent
Shanta Sriram Construction Pvt. Ltd 13 B.S. Envi-Tech (P) Ltd., Sec’bad.
PHOTOGRAPHS OF THE PROJECT
Shanta Sriram – Tech Park Gachibowli Village, Serilingampally Mandal, Ranga Reddy District, Telangana.
EMP Report
Project proponent
Shanta Sriram Construction Pvt. Ltd 14 B.S. Envi-Tech (P) Ltd., Sec’bad.