2
Salford City College Eccles Sixth Form Centre BTec Level 3 Extended Diploma in Creative Media Production Games Design Final Major Project Production Log Name Sam Gregory Haigh Date Comments Sunday 10.02.13 Tuesday 26.02.13 I have made some blueprints with sizes of the pitch and a seating layout that I think is suitable for both fans and the press.

FMP Production Log Week 2

Embed Size (px)

Citation preview

Page 1: FMP Production Log Week 2

Salford City College Eccles Sixth Form Centre BTec Level 3 Extended Diploma in Creative Media Production

Games Design

Final Major Project Production Log

Name Sam Gregory Haigh

Date Comments Sunday 10.02.13 Tuesday 26.02.13

I have made some blueprints with sizes of the pitch and a seating layout that I think is suitable for both fans and the press.

Page 2: FMP Production Log Week 2

Tuesday 05/03/13 Wednesday 06/03/13

I have also looked on Google maps for a suitable location to make the stadium, but there is nowhere that it could be built, so I will have to make it up. I also asked my friends, who are big Bury fans, my plans for the stadium and if they had any suggestions, they just said they love the proposed idea, but try to keep it near the centre of Bury. I have uploaded my questionnaires answers sheet onto my blog I have also started to do my pitch plans. I have also made a powerpoint presentation that deals with audience profiling. I have also finalised a location for my stadium, made an email that is ready to send to the club after proofreading and did some research into architecture.

I have sent the email to Bury and am now awaiting a reply.