    Fiscal Year 2011/12 Project Report

    Project Name Power Capacity(kW) Remarks

    Hewa Khola 4455 kW completed

    Lower Piluwa 990 kW completed

    Gamgad small hydropower

    project

    400 kW completed

    Dhalkebar-Muzaffarpur doublecircuit transmission line

    400 kV Cross-border interconnectionbetween Nepal and India.

    Necessary ground works are now

    in place for taking off the

    implementation. Expected to be

    in operation by 2014

    Rasuwagadhi

    HydroelectricProject

    111MW

    Middle Bhotekoshi Hydroelectric

    Project

    102MW

    Upper Sanjen Hydroelectric

    Project

    14.8 MW

    Sanjen Hydroelectric Project 42.5 MW

    Upper Modi Hydropower Project 47 MW NEA and K-Water(S.Korea) with

    20% NEA share ownership

    Upper Trishuli Hydropower

    Project

    60 MW

    Hetaunda-Bharatpur

    Transmission Line

    220 kV

    Bhotekoshi Hydropower Project 9 MW

    Kulekhani-3 Hydroelectric

    Project

    14 MW Completion date September

    13,2014

    Chameliya Hydrolectric Project 30 MW tunnel breakthrough on 12th

    May, 2012

    Overall progress of civil works is

    75%

    Upper Trishuli 3A 60 MW Construction of major works of

    the Project is to commence only

    after the issuance of Work Order

    by the Consultant.

    The Khimti Dhalkebar Double

    Circuit Transmission line Project

    220 kV 95 % work completed

    the completion of the project is

    hampered due to obstructions

    created by local residents

    regarding the right of way issue

    Hetauda- Bharatpur Bardghat

    transmission line

    220 kV Work is underway

    Syangja substation 132 kV Almost complete and expected

    to be commissioned soon

  • 7/29/2019 Fiscal Year 2012 Project

    2/2

    Fiscal Year 2011/12 Project Report

    Dumre-Damauli-Marsyangdi

    132kV transmission line

    132 kV Substantial Progress

    Singati-Lamosangu 132kV

    transmission line

    132 kV Substantial Progress

    Kabeli 132 kV transmission line 132 kV Substantial Progress

    Chapali 132 kV substation 132 kV Substantial ProgressPathlaiya 132 kV substation 132 kV Substantial Progress

    Matatirtha 132 kV substation

    extension

    132 kV Substantial Progress

    Second circuit stringing of

    Butwal Kohalpur-

    Mahendranagar 132 kV

    transmission line

    132 kV Substantial Progress

    Second circuit stringing of

    Hetauda Kulekhani-II -

    Siuchatar 132 kV transmission

    line

    132 kV Substantial Progress

    Hetauda Dhalkebar Duhabi

    400 kV transmission line project

    400 kV Cross border power exchange

    with India

    Upper Tamakoshi Hydro Power

    Company Limited (UTKHPL)

    456 MW NEA with 41% stake

    A Project Of National Pride

    Construction Works ongoing at

    full swing

    Tanahu Hydropower Project 140 MW The detailed engineering study

    of the project is in the final stage

    of completion. Construction

    could begin by mid 2013

    Upper Trishuli 3BHydroelectric Project

    37 MW Under development