First Quarter 2012 Financial and Production Results First Quarter 2012 Financial and Production Results: 30 September 2011 www.aquariusplatinum.com Page 1 of 26 Aquarius Platinum Limited Financial and Production Results to 30 September 2011 Highlights y Attributable production for the first quarter decreased by 3% quarteronquarter to 109,828 PGM ounces y Average PGM Dollar prices deteriorated in the quarter – platinum and palladium both down 1% and rhodium down 13% y The Rand weakened against the US Dollar by 5% on average quarteronquarter, and by 20% over the current quarter y Onmine EBITDA increased by 24% yearonyear to $34.5 million y Foreign exchange loss of $94.3 million on intercompany loans, resulting in a net loss after tax (IFRS) for the quarter of $91.8 million y Production at Kroondal and Marikana remained adversely affected by manual installation of hangingwall support y Production at Everest negatively impacted by continuing poor ground conditions and section 54 stoppages Q1 2012 Operating Results Summary Kroondal Marikana Everest * Mimosa CTRP Plat. Mile 4E PGM Production Total (100% basis) 88,908 25,993 23,074 53,798 661 3,087 Attributable 44,454 12,996 23,074 26,899 331 2,074 4E Basket Price R/oz 10,374 10,431 10,233 10,745 10,267 $/oz 1,480 1,488 1,460 1,374 1,535 1,438 Cash Costs (4E basis) R/oz 8,507 10,098 9,775 16,223 7,723 $/oz 1,213 1,440 1,394 726 2,318 1,082 Cash Margin (%) 1 (14) (6) 50 (516) 22 StayinBusiness Capex R/oz 1,062 726 1,970 3,763 311 $/oz 151 103 281 301 538 43 * Everest is in rampup phase Commenting on the results, Stuart Murray, CEO of Aquarius Platinum said: The first quarter of FY2012 has been a truly difficult one. As expected, the operational issues that we faced at our South African operations in the final quarter of FY2011 continued to pose challenges in the period under review, exacerbated by further primary mining contractor underperformance in Q1. This escalating underperformance relates to a failure to achieve agreed budgeted production and unit cost targets at all the SA mines, and a failure to maintain acceptable safety standards and industrial relations practices (particularly at Everest). This continued underperformance is currently being addressed, and AQPSA’s management is formulating strategies to resolve it which will include revisiting the cost reimbursable basis of the primary mining contract. AQPSA will be taking an increasingly interventionist role in the management of this contractor as the current risk profile of the contract (which overly favours the contractor) is not sustainable, especially in the current metal price environment. At Kroondal and Marikana, the issues relating to the implementation of our new support systems, and long lead times for the necessary equipment, do remain. However, safety is an area in which we will not compromise. Everest continues to face temporary adverse geological conditions and also suffered extensive section 54 shutdowns and maintenance issues. The tailings operations continued to suffer from feedstock quality issues, impacting costs through their very high fixed cost base. On a more positive note, Mimosa returned an For personal use only

First Quarter 2012 Financial and Production Results · First Quarter 2012 Financial and Production Results First Quarter 2012 Financial and Production Results: 30 September 2011 Page

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

Page 1: First Quarter 2012 Financial and Production Results · First Quarter 2012 Financial and Production Results First Quarter 2012 Financial and Production Results: 30 September 2011 Page

First Quarter 2012 Financial and Production Results

First Quarter 2012 Financial and Production Results: 30 September 2011 www.aquariusplatinum.com Page 1 of 26

Aquarius Platinum Limited Financial and Production Results to 30 September 2011 

 Highlights     Attributable production for the first quarter decreased by 3% quarter‐on‐quarter to 109,828 PGM ounces  Average PGM Dollar prices deteriorated in the quarter – platinum and palladium both down 1% and rhodium down 13%  The Rand weakened against the US Dollar by 5% on average quarter‐on‐quarter, and by 20% over the current quarter  On‐mine EBITDA increased by 24% year‐on‐year to $34.5 million  Foreign exchange loss of $94.3 million on inter‐company loans, resulting in a net loss after tax (IFRS) for the quarter of $91.8 million 

Production at Kroondal and Marikana remained adversely affected by manual installation of hangingwall support  Production at Everest negatively impacted by continuing poor ground conditions and section 54 stoppages 

  

 Q1 2012 Operating Results Summary 

Kroondal  Marikana  Everest *  Mimosa  CTRP  Plat. Mile 

4E PGM Production             

Total (100% basis)  88,908  25,993  23,074  53,798  661  3,087 

Attributable  44,454  12,996  23,074  26,899  331  2,074 

4E Basket Price              

R/oz  10,374  10,431  10,233  ‐  10,745  10,267 

$/oz  1,480  1,488  1,460  1,374  1,535  1,438 

Cash Costs (4E basis)             

R/oz  8,507  10,098  9,775  ‐  16,223  7,723 

$/oz  1,213  1,440  1,394  726  2,318  1,082 

Cash Margin (%)  1  (14)  (6)  50  (516)  22 

Stay‐in‐Business Capex             

R/oz  1,062  726  1,970  ‐  3,763  311 

$/oz  151  103  281  301  538  43 

* Everest is in ramp‐up phase      

 Commenting on the results, Stuart Murray, CEO of Aquarius Platinum said:   

The first quarter of FY2012 has been a truly difficult one. As expected, the operational issues that we faced at our South African operations in the final quarter of FY2011 continued to pose challenges in the period under review, exacerbated by  further primary mining contractor underperformance  in Q1. This escalating underperformance relates to a failure to achieve agreed budgeted production and unit cost targets at all the SA mines, and a failure to maintain acceptable safety standards and industrial relations practices (particularly at Everest). This continued underperformance is currently being addressed, and AQPSA’s management is formulating strategies to resolve it which will include revisiting the cost reimbursable basis of the primary mining contract. AQPSA will be taking an increasingly  interventionist role  in the management of this contractor as the current risk profile of the contract (which overly favours the contractor) is not sustainable, especially in the current metal price environment.   

At Kroondal and Marikana, the issues relating to the implementation of our new support systems, and long lead times  for  the necessary  equipment, do  remain. However,  safety  is an area  in which we will not  compromise. Everest  continues  to  face  temporary  adverse  geological  conditions  and  also  suffered  extensive  section  54 shutdowns and maintenance  issues. The  tailings operations  continued  to  suffer  from  feedstock quality  issues, impacting  costs  through  their  very  high  fixed  cost  base.  On  a  more  positive  note,  Mimosa  returned  an 

For

per

sona

l use

onl

y

Page 2: First Quarter 2012 Financial and Production Results · First Quarter 2012 Financial and Production Results First Quarter 2012 Financial and Production Results: 30 September 2011 Page

First Quarter 2012 Financial and Production Results

First Quarter 2012 Financial and Production Results: 30 September 2011 www.aquariusplatinum.com Page 2 of 26

outstanding performance, lowering costs while continuing to produce at capacity. These operational difficulties, while unhelpful in the quarter under review, are in each case temporary in nature and are in the process of being rectified. 

The global economy is weakening once more. Basket prices were flat quarter‐on‐quarter in both currencies, but both fell in the final week of the period, and have remained at a lower level in October. The reasons for this relate to macroeconomic issues such as European sovereign debt rather than PGM fundamentals, which remain strong. Fortunately the Rand has weakened against the Dollar  in step with the Euro, providing some relief  from  lower Dollar metals prices. 

The  quarter  did  have  its  positive  aspects,  with  an  agreement  reached  with  our  partners  at  Kroondal  and Marikana  to  exploit  the  Siphumelele  3  ore  reserves  through  the  P&SAs,  in  keeping with  our  commitment  to expand the scope of those operations. We were also able to settle our wage negotiations at a level acceptable to all  parties with  no  disruption. We  are working  hard  to  resolve  the  current  operational  challenges  and  I  am confident that we will be able to restore our margins in the short term and emerge with a stronger business and safer, more robust mines. We have among the lowest capital intensities in the platinum sector and these factors together  will  enable  us  to  weather  any  renewed  deterioration  in  the  economic  environment.

For

per

sona

l use

onl

y

Page 3: First Quarter 2012 Financial and Production Results · First Quarter 2012 Financial and Production Results First Quarter 2012 Financial and Production Results: 30 September 2011 Page

First Quarter 2012 Financial and Production Results

First Quarter 2012 Financial and Production Results: 30 September 2011 www.aquariusplatinum.com Page 3 of 26

Production by mine 

PGMs (4E) Quarter ended 

Sept 2011  June 2011  % Change  Sept 2010  % Change 

Kroondal  88,908  89,196  (0%)  110,575  (20%) 

Marikana  25,993  21,411  21%  27,756  (6%) 

Everest  23,074  26,954  (14%)  20,417  13% 

Blue Ridge   ‐  3,021  (100%)  8,092  (100%) 

Mimosa  53,798  55,605  (3%)  54,133  (1%) 

CTRP  661  685  (4%)  1,470  (55%) 

Platinum Mile  3,087  4,694  (34%)  3,923  (21%) 

Total  195,521  201,566  (3%)  226,366  (14%) 

 

Production by mine attributable to Aquarius 

PGMs (4E) Quarter ended 

Sept 2011  June 2011  % Change  Sept 2010  % Change 

Kroondal  44,454  44,598  (0%)  55,287  (20%) 

Marikana  12,996  10,705  21%  13,878  (6%) 

Everest  23,074  26,954  (14%)  20,417  13% 

Blue Ridge   ‐  1,510  (100%)  4,046  (100%) 

Mimosa  26,899  27,803  (3%)  27,067  (1%) 

CTRP  331  343  (3%)  735  (55%) 

Platinum Mile  2,074  2,347  21%  1,962  44% 

Total  109,828  114,260  (3%)  123,392  (10%) 

 

Aquarius Group attributable production (PGM ounces) to 30 September 2011 

 

0

20,000

40,000

60,000

80,000

100,000

120,000

Dec‐10 Mar‐11 Jun‐11 Sep 11

Kroondal Marikana Everest Mimosa CTRP Platinum Mile Blue Ridge

For

per

sona

l use

onl

y

Page 4: First Quarter 2012 Financial and Production Results · First Quarter 2012 Financial and Production Results First Quarter 2012 Financial and Production Results: 30 September 2011 Page

First Quarter 2012 Financial and Production Results

First Quarter 2012 Financial and Production Results: 30 September 2011 www.aquariusplatinum.com Page 4 of 26

Market Summary   Metals prices  The Dollar prices of both platinum and palladium remained relatively steady over much of the  first quarter, as fundamental  industrial demand continued to  improve slowly and the global supply‐chain disruptions caused to the automotive  industry by the Japanese earthquake and tsunami were resolved. The prices of both metals fell sharply in the final week of the quarter, however, as investor sentiment deteriorated markedly in response to the debt  crisis  in  Europe  and  signs of potential  recession  in  various parts of  the world.  These  falls  in price were accompanied by outflows  from both  the platinum  and palladium physically‐backed ETFs, demonstrating once again that prices are currently driven by investor views rather than fundamental demand. The price of rhodium weakened throughout the quarter, reflective of the significant current surplus in that metal.   The average platinum and palladium prices both fell by 1% quarter‐on‐quarter, while the average rhodium price fell by 13%. Gold rose by 13% on average, reflecting the uncertainty in world markets, but in a counterintuitive development, it weakened along with the industrial commodities at the end of the quarter, as investor liquidity was pulled from the market. Gold reached parity with platinum for an unprecedented period during the quarter under review, and  the platinum price has now  fallen  to below  that of gold. Platinum closed  the quarter down 12% at $1,511 per ounce, while palladium  fell by 18%  to $614 per ounce over  the same period. The  rhodium price fell 16% to $1,675 per ounce over the quarter and gold rose 9% to $1,622 per ounce.   PGM prices have remained at the lower levels reached at the end of the first quarter in October, and while the European debt crisis  remains unresolved and  the global economic  recovery continues  to slow,  this situation  is unlikely to change. The outlook for PGM prices in the medium term remains good, but macroeconomic concerns are likely to outweigh this in the short term.  Rand‐Dollar exchange rate  The average Rand‐Dollar exchange rate for the quarter weakened by 5% from R6.80 to R7.15 to the US dollar, with much of the deterioration coming at the end of the quarter  in response to the weakness  in the Eurozone (South Africa’s  largest trading partner),  investor risk aversion for developing markets and a stronger US Dollar. The Rand closed the quarter down 20% at R8.13 to the Dollar.   Rand basket prices remained relatively stable over much of the quarter, with currency moves offsetting changes to US Dollar PGM prices until the final week of the quarter, when metal price falls began to outweigh currency gains. Average PGM basket prices over  the quarter weakened slightly at all operations  in US Dollar  terms but improved slightly in Rand terms. The US Dollar weighted average group basket price decreased by 2% to $1,450 per 4E PGM ounce  compared  to  the previous quarter, while  the weighted average basket price at  the South African operations was $1,475 per PGM ounce. The average South African basket price was R10,540 per PGM ounce for the period, a 3% increase compared to the prior quarter.     

For

per

sona

l use

onl

y

Page 5: First Quarter 2012 Financial and Production Results · First Quarter 2012 Financial and Production Results First Quarter 2012 Financial and Production Results: 30 September 2011 Page

First Quarter 2012 Financial and Production Results

First Quarter 2012 Financial and Production Results: 30 September 2011 www.aquariusplatinum.com Page 5 of 26

 

12‐month individual PGM prices to September 2012(US$/oz) 

12‐month PGM basket prices to September 2012(US$ and ZAR per PGM basket ounce) 

12‐month Rand‐Dollar exchange rate to September 2012(ZAR/US$) 

 

  Average PGM basket prices achieved at Aquarius operations  

US$ per PGM ounce (4E) 

Quarter ended 

Sept 11  June 11  % Change  Sept 11  % Change 

Kroondal  1,480  1,519  ‐3%  1,307  16% 

Marikana  1,488  1,523  ‐2%  1,306  17% 

Everest  1,460  1,484  ‐2%  1,265  17% 

Blue Ridge   ‐  1,511   ‐  1301  ‐ 

Mimosa  1,374  1,392  ‐1%  1,144  22% 

CTRP  1,535  1,636  ‐6%  1,426  15% 

Platinum Mile  1,438  1,487  ‐3%  1,300  14% 

Weighted Avg.  1,450  1,480  ‐2%  1,265  17% 

 

 

   

400450500550600650700750800850900

1,000

1,200

1,400

1,600

1,800

2,000

2,200

2,400

Oct 10 Dec 10 Mar 11 Jun 11 Sep 11

Platinum Gold Rhodium Palladium

Pt, Ru & Au ($/oz) Pd ($/oz)

8,000 

8,500 

9,000 

9,500 

10,000 

10,500 

11,000 

11,500 

12,000 

12,500 

1,100 

1,200 

1,300 

1,400 

1,500 

1,600 

1,700 

Oct 10 Dec 10 Mar 11 Jun 11 Sep 11

SA $ Basket Zim $ Basket SA R Basket

$/oz R/oz

6.50

6.70

6.90

7.10

7.30

7.50

7.70

7.90

8.10

8.30

8.50

Oct 10 Dec 10 Mar 11 Jun 11 Sep 11

R/$

For

per

sona

l use

onl

y

Page 6: First Quarter 2012 Financial and Production Results · First Quarter 2012 Financial and Production Results First Quarter 2012 Financial and Production Results: 30 September 2011 Page

First Quarter 2012 Financial and Production Results

First Quarter 2012 Financial and Production Results: 30 September 2011 www.aquariusplatinum.com Page 6 of 26

 Financial results  Aquarius recorded on‐mine EBITDA of $34.9 million for the quarter ended September 2011, an increase of 24% compared to the previous corresponding period (pcp), September 2010. The result was despite production for the quarter being 8% lower at 109,828 PGM ounces attributable to Aquarius. The net result of the group, a net loss  after  tax  of  $91.8 million,  was  distorted  by  $94.3 million  of  foreign  exchange  losses  arising  from  the revaluation of  inter‐company  loans and non‐US Dollar cash balances at period end. Significant currency swings between  the Rand and  the US Dollar were experienced during  the quarter, which saw  the Rand weaken 20% from R6.76 to R8.13 at the close of the quarter.  EBITDA, Profit & Production Comparison by corresponding quarters 

 * excludes PGM ounces of Blue Ridge production capitalised.   On‐mine EBITDA for the quarter of $34.9 million was 24% higher compared to the pcp despite lower production and higher unit costs. This was due to foreign exchange gains on sales of $27.0 million which were partially offset by negative PGM sales adjustments of $6.7 million. The  foreign exchange gains  (at mine  level) were however more than offset by  foreign exchange  losses recorded by the group on cash balances  (Rand, Australian dollar, Pound  Sterling),  and  the  revaluation  of  inter‐company  loans;  resulting  in  net  foreign  exchange  losses  to  the group of $94.1 million.   Revenue (PGM sales and including interest income of $3.5 million) was down 3% to $144.6 million from $149.1 million in the pcp. Revenue was inclusive of negative sales adjustments of $6.7 million due to the flow‐through of declining PGM prices experienced during the quarter.  Despite the decline in PGM prices towards the end of September, the average revenue per ounce achieved for the quarter was slightly higher at $1,317 compared to the pcp, despite PGM prices having retreated in the second half of September to their current low levels.  

        

 Production for the quarter was 8% lower at 109,828 PGM ounces, down from 119,346 PGM ounces in the pcp. This was  largely  due  to  lower  production  at  Kroondal  and Marikana;  collectively  down  11,714  PGM  ounces compared  to  the  pcp.  Generally,  the  decrease  in  production  was  linked  to  the  slower  than  expected implementation of the new underground support processes as part of the reinforced focus on increased safety. Everest and Mimosa exceeded production compared to the pcp. 

 Quarter ended

Sept 2011 Quarter ended

Sept 2010 Movement 

Financial yearended 

June 2011 EBITDA  $34.9M  $28.1M  $6.8M  $203.2M Headline earnings  ‐  ‐  ‐  $142.8M Forex (loss)/gain  ($94.3M)  $37.0M  $131.3M  $60.1M Net (loss)/profit after tax  ($91.8M)  $42.4M  ($134.2M)  ($10.4M) Revenue  $144.6M  $149.1M  ($4.5M)  $682.9M 

PGM ozs production (in operation)  109,828  119,346*  (9,518)  478,551* 

  Quarter ended 

  Sept 2010  Dec 2010  Mar 2011  June 2011  Sept 2011 

Revenue   $145.5m  $174.2m  $174.3m  $164.8m  $151.3m PGM sales adjustments   $3.6m  $12.9m  $8.5m  ($0.9m)  ($6.7m) 

Total revenue  $149.1m  $187.1m  $182.8m  $163.9m  $144.6m 

For

per

sona

l use

onl

y

Page 7: First Quarter 2012 Financial and Production Results · First Quarter 2012 Financial and Production Results First Quarter 2012 Financial and Production Results: 30 September 2011 Page

First Quarter 2012 Financial and Production Results

First Quarter 2012 Financial and Production Results: 30 September 2011 www.aquariusplatinum.com Page 7 of 26

      

 Total cash cost of production was higher at $126 million despite  lower production due  to  the high  fixed cost nature of the mining contract. This translated into higher weighted average on‐mine unit costs which increased 28% in South Africa in Rand terms compared to the pcp, and 17% quarter on quarter. In Dollar terms, unit costs increased 33% compared to the pcp due principally to Rand weakness against the US Dollar.    Unit costs increased at all operations in Rand and US Dollar terms compared to the pcp, although Mimosa’s unit costs fell by 9% in US Dollars compared to the previous quarter.   Amortisation  and  depreciation  was  higher  at  $19.9  million  from  $13.5  million  in  the  pcp  despite  lower production due to an increased write off of mine development costs following closure of the Marikana open pit.   Administration and other  costs at $3.9 million are  in  line with expectations based on  these  costs  in previous periods. Finance costs for the quarter of $9.2 million comprised interest on the convertible note of $4.8 million, non‐cash  interest accretion on the convertible note of $2.5 million, pipeline finance of $0.3 million, borrowing costs of $0.3 million and unwinding of the rehabilitation provision of $1.4 million. 

 Capitalisation of inter‐company loans During  the quarter, Aquarius  capitalised $353 million of  intercompany  loans with  its  subsidiaries, AQPSA and ACS(SA).  The value of these loans is now represented as capital in the subsidiaries and will no longer be subject to monthly revaluation through the income statement.  The loans were capitalised at a ZAR/USD exchange rate higher  than  that pertaining when  the  loans were originally  transacted and accordingly, a  tax  credit has been booked during the quarter.  Cash The Group cash balance at the end of the quarter under review was $276 million.   Net operating cash flow for the quarter of $34 million comprised $184 million from sales, $148 million paid to suppliers, net finance costs of $1 million and income tax paid of $1 million. During the quarter Aquarius settled the acquisition of 41.7% of Platmile for $16 million and also paid out Aquarius’ dividend of 4 cents per share to Aquarius shareholders of $19 million.    Group cash at 30 September 2011 was held as follows:  AQP    $207 million AQPSA    $  25 million ACS(SA)    $    2 million Mimosa    $  34 million Ridge Mining  $    2 million Platmile   $    6 million Total    $276 million       

  Quarter ended 

Attributable ounces  Sept 2010  Dec 2010  Mar 2011  June 2011  Sept 2011 

4PGE production  Blue Ridge  

119,3464,046 

127,579‐ 

122,213‐ 

114,220 ‐ 

109,828‐ 

Total production  123,392  127,579  122,213  114,220  109,828 

For

per

sona

l use

onl

y

Page 8: First Quarter 2012 Financial and Production Results · First Quarter 2012 Financial and Production Results First Quarter 2012 Financial and Production Results: 30 September 2011 Page

First Quarter 2012 Financial and Production Results

First Quarter 2012 Financial and Production Results: 30 September 2011 www.aquariusplatinum.com Page 8 of 26

Aquarius Platinum Limited Consolidated Income Statement 

Quarter ended 30 September 2011 $’000 

 

Note 

Quarter Ended Financial Year 

Ended 

30/09/11*  30/09/10*  30/06/11 

 PGM Production from operating mines Blue Ridge Total production 

 109,828 

‐ 109,828 

119,346 4,046 

123,392 

483,358 4,046 

487,404 

 

Revenue  (i)  144,579  149,102  682,859 

Cost of sales (including D&A)  (ii)  (146,189)  (120,779)  (507,728) 

Gross (loss)/profit    (1,610)  28,323  175,131 

Other income    167  150  1,764 

Administrative costs  (iii)  (3,965)  (4,039)  (13,030) 

Foreign exchange (loss)/gain  (iv)  (94,116)  45,301  60,068 

Finance costs  (v)  (9,265)  (7,505)  (30,945) 

Impairment losses  (vi)  ‐  ‐  (159,779) 

Settlement of contractor dispute  (vi)  ‐  (7,810)  (7,810) 

(Loss)/profit before income tax    (108,789)  54,420  25,399 

Income tax benefit/(expense)  (viii)  16,947  (12,021)  (35,795) 

Net (loss)/profit    (91,842)  42,399  (10,396) 

EPS (basic – cents per share)    (19.6)  9.2  (2.25) 

 * Unaudited     

For

per

sona

l use

onl

y

Page 9: First Quarter 2012 Financial and Production Results · First Quarter 2012 Financial and Production Results First Quarter 2012 Financial and Production Results: 30 September 2011 Page

First Quarter 2012 Financial and Production Results

First Quarter 2012 Financial and Production Results: 30 September 2011 www.aquariusplatinum.com Page 9 of 26

Notes on the September 2011 Consolidated Income Statement 

(i) Revenue decrease reflects lower production and flat prices compared to the pcp.  

(ii) Cost of sales: unit cash costs per PGM ounce increased 17.0% in South Africa in Rand quarter‐on‐quarter and 28.5% compared to September 2010. In US Dollar terms unit costs increased 9.6% quarter‐quarter and 32.5% compared to September 2010 principally due to Rand weakness compared to the US Dollar  

(iii) Administration and other costs of $4.0 million are in line with previous periods.  

(iv) Forex loss is largely attributable to negative revaluation adjustments on intergroup debt, cash balances held in Rand, Australian dollars and Pound Stirling, and the revaluation of pipeline debtors following the weakening of the Rand against the US Dollar.  

(v) Finance costs include convertible note debt $4.8 million, non‐cash interest accretion on the convertible note $2.5 million, pipeline finance $0.3 million, borrowing costs $0.3 million and unwinding of the rehabilitation provision $1.4 million. 

(vi) Impairment losses relating to the Blue Ridge mine which has ceased operations  

(vii) Settlement payment of the contractor dispute between Moolman Mining and AQPSA pursuant to an agreement of settlement signed in August 2010, in full and final settlement of all disputes and claims between the parties.  

(viii) Income tax benefit relates to reversal of deferred tax balances on realisation of foreign exchange losses. 

For

per

sona

l use

onl

y

Page 10: First Quarter 2012 Financial and Production Results · First Quarter 2012 Financial and Production Results First Quarter 2012 Financial and Production Results: 30 September 2011 Page

First Quarter 2012 Financial and Production Results

First Quarter 2012 Financial and Production Results: 30 September 2011 www.aquariusplatinum.com Page 10 of 26

Aquarius Platinum Limited Consolidated Statement of Cash Flows Quarter ended 30 September 2011 

$’000 

  

  Quarter Ended Financial Year 

Ended 

   Note  30/09/11*  30/09/10*  30/06/11 

Net operating cash inflow   (i)  34,056  39,790  162,311 

Net investing cash outflow   (ii)  (44,489)   (45,754)  (209,908) 

Net financing cash inflow/(outflow)  (iii)  (25,519)  (30,159)                (33,527) 

Net decrease in cash held     (35,952)  (36,123)  (81,124) 

Opening cash balance     328,083  381,734  381,734 

Exchange rate movement on cash     (16,329)  18,273  27,473 

Closing cash balance      275,802  363,884  328,083 

 * Unaudited  

Notes on the September 2011 Consolidated Statement of Cash Flows 

(i) Includes $184 million inflow from sales, $158 million paid to suppliers, net finance costs of $1 million and income tax paid of $1 million. 

(ii) Includes development and plant and equipment expenditure of $28 million on AQPSA and Mimosa operations and $16m payment for purchase of a 41.7% interest in Plat Mile. 

(iii) Includes payment of 4 cents per share dividend to Aquarius shareholders of $19 million, purchase of treasury shares of $3 million and repayment of borrowings of $3 million. 

   

For

per

sona

l use

onl

y

Page 11: First Quarter 2012 Financial and Production Results · First Quarter 2012 Financial and Production Results First Quarter 2012 Financial and Production Results: 30 September 2011 Page

First Quarter 2012 Financial and Production Results

First Quarter 2012 Financial and Production Results: 30 September 2011 www.aquariusplatinum.com Page 11 of 26

Aquarius Platinum LimitedConsolidated Balance Sheet 

At 30 September 2011  

 

 

Quarter Ended 

30 Sept 2011 

Financial Year Ended 

30 June 2011 

Note  $’000  $’000 

Assets       

Cash assets    275,802  328,083 

Current receivables  (i)  92,197  108,395 

Other current assets  (ii)  44,835  44,747 

Property, plant and equipment  (iii)  279,515  325,763 

Mining assets  (iv)  439,955  480,634 

Other non‐current assets  (vi)  81,323  91,735 

Intangibles  (v)  64,415  77,989 

Total assets    1,278,042  1,457,346 

Liabilities       

Current liabilities  (vii)  112,544  120,549 

Non‐current payables  (viii)  5,266  6,150 

Non‐current interest‐bearing liabilities  (ix)  256,488  257,599 

Other non‐current liabilities  (x)  176,591  221,711 

Total liabilities    550,889  606,009 

Net assets    727,153  851,337 

Equity       

Issued capital    23,509  23,509 

Reserves    697,647  711,182 

Retained earnings    5,997  116,646 

Total Equity    727,153  851,337 

 * Unaudited     

For

per

sona

l use

onl

y

Page 12: First Quarter 2012 Financial and Production Results · First Quarter 2012 Financial and Production Results First Quarter 2012 Financial and Production Results: 30 September 2011 Page

First Quarter 2012 Financial and Production Results

First Quarter 2012 Financial and Production Results: 30 September 2011 www.aquariusplatinum.com Page 12 of 26

Notes on the September 2011 Consolidated Balance Sheet  

(i) Reflects debtors receivable on PGM concentrate sales 

(ii) Reflects PGM concentrate inventory, consumables, stores and critical spares. (iii) Represents plant and equipment within the Group 

(iv) Includes group’s mining assets at Kroondal, Marikana, Mimosa, Everest, Blue Ridge, CTRP and Platmile (v) Includes intangibles relating to goodwill and contract value acquired on acquisition of 50.0% equity interest in 

Platinum Mile Resources (Pty) Ltd. (vi) Includes recoverable portion of rehabilitation provision at P&SA sites of $12 million, cash contributed to 

Rehabilitation Trusts of $17 million, listed investments of $1 million,  Mimosa receivable from RBZ relating to the previous requirements to repatriate US Dollar proceeds on metals sales to the RBZ of $28 million, and  Blue Ridge receivables from outside shareholders of $23 million.  

(vii) Includes  trade  creditors  of  $81 million,  DBSA  and  IDC  bank  loans  in  Blue  Ridge  of  $30 million,  current  tax liabilities of $1 million and provision for annual leave of $1 million.   

(viii) Includes rehabilitation obligations on P&SA1 and P&SA2 structures. 

(ix) Includes convertible bonds of $248 million and AQPSA / Blue Ridge lease facilities of $8 million. 

(x) Includes deferred tax liabilities $116 million and provision for closure costs $61 million. 

   

For

per

sona

l use

onl

y

Page 13: First Quarter 2012 Financial and Production Results · First Quarter 2012 Financial and Production Results First Quarter 2012 Financial and Production Results: 30 September 2011 Page

First Quarter 2012 Financial and Production Results

First Quarter 2012 Financial and Production Results: 30 September 2011 www.aquariusplatinum.com Page 13 of 26

Operating Review Summary (all numbers on 100% basis)  AQUARIUS PLATINUM (SOUTH AFRICA) (PTY) LTD (Aquarius Platinum ‐ 100%)  P&SA 1 at Kroondal (Aquarius Platinum – 50%)  12‐month rolling average DIIR improved to 0.63 per 200,000 man hours from 0.77 in the previous quarter  Production increased by 4% to 1,483,000 tonnes  Head grade deteriorated from 2.46 g/t to 2.39g/t  Recoveries deteriorated by 0.4%  Volumes processed increased by 3% to 1,478,000 tonnes  Stockpiles at the end of the quarter totalled approximately 20,000 tonnes   PGM production decreased by 0.3% to 88,908 PGM ounces  Revenue increased by 0.3% to R766 million Q‐on‐Q due to a slight increase in the Rand basket price  Mining cash costs increased by 13% to R512 per tonne, and costs per PGM ounce by 17% to R8,507  Kroondal’s cash margin for the period decreased from 15% to 1% 

 P&SA2 at Marikana (Aquarius Platinum – 50%)  12‐month rolling average DIIR improved to 0.30 per 200,000 man hours from 0.48 in the previous quarter  Production increased by 18% to 476,692 tonnes, all from underground operations   Head grade increased by 3% to 2.30 g/t  Recoveries increased by 2% to 75%  Volumes processed increased by 16% to 467,334 tonnes  PGM production increased by 21% to 25,993 ounces  Revenue increased by 22% to R230 million Q‐on‐Q due to improved PGM production   Mining cash costs increased by 13% to R562 per tonne, and costs per PGM ounce by 8% to R10,098  Marikana’s cash margin deteriorated from (6%) to (14%)  

  Everest Mine (Aquarius Platinum – 100%)  12 month rolling DIIR deteriorated to 1.28 per 200,000 man hours from 0.41 in the previous quarter  Production decreased by 11% to 326,000 tonnes  Head grade deteriorated from 2.62 g/t to 2.57 g/t  Recoveries remained stable at 85%  Volumes processed decreased by 13% to 327,000 tonnes  PGM production decreased by 14% to 23,074 PGM ounces  Revenue decreased by 13% compared to the previous quarter to R213 million   Mining  cash  costs  increased by  19%  to R689 per  tonne,  and  costs per  PGM ounce  increased by 20%  to 

R9,775  Everest’s cash margin decreased from 10% to (6%) 

 Commentary  Kroondal and Marikana: Mine production continued to be negatively impacted by the implementation of the new hangingwall support systems, as manual drilling of support holes remained necessary during the quarter. Slower‐than‐plan installation of support thus continued to interfere with the blasting cycle. These mines are now trialling a locally manufactured prototype rock drill for mechanised support installation, and it is possible that these significantly cheaper units may be rolled out to use in place of the imported drilling rigs currently under order but subject to long lead times.   The change in mining orientation also continued to require the establishment of additional face at the expense of head grade. Production in the quarter was comparable to the previous period but significantly below capacity, which had a negative effect on unit costs due to the high fixed cost base. The extent of the fixed cost base is a feature of the mining contractor agreement across Aquarius’s South African operations, and this agreement is currently being renegotiated to remove this inflexibility.   

For

per

sona

l use

onl

y

Page 14: First Quarter 2012 Financial and Production Results · First Quarter 2012 Financial and Production Results First Quarter 2012 Financial and Production Results: 30 September 2011 Page

First Quarter 2012 Financial and Production Results

First Quarter 2012 Financial and Production Results: 30 September 2011 www.aquariusplatinum.com Page 14 of 26

Mine management has been informed that the supplier of the imported specialty drill steel used in the new hangingwall support methodology will be unable to deliver sufficient units to meet AQPSA’s requirements until the middle of the third financial quarter of 2012. This has necessitated moving certain areas of these mines back to the old national standard of roof support in the short term. While this situation is not optimal, it has enabled those mining areas to begin producing at capacity once again. The new technologies for the early detection of geological anomalies (ground penetrating radar, snake‐eye cameras and the other elements of the revised TARP system) remain in place in all mining areas.  Rustenburg Platinum Mines’ (RPM) Siphumelele 3 ore reserves have now been included in both P&SA1 and P&SA2 and mining there has commenced, in accordance with an agreement between RPM and AQPSA (see “Corporate Matters” below).  Everest: Mining during the quarter was negatively impacted by the same oxidised ore and resulting poor ground conditions seen in the prior period. Tragically, two fatalities also occurred at Everest during the quarter in separate incidents, and the associated section 54 safety stoppages caused the loss of 27 shifts. One of the accidents involved an underground vehicle (LDV), and further impacts on production were caused by the need to modify LDV brake systems which reduced the number of these vehicles available underground, especially for maintenance. This resulted in lower LHD and drill rig availability. Finally, there was also an underground belt fire, and a further 9 shifts were lost while it was repaired. These incidents resulted in production significantly below plan, and this resulted in materially higher unit costs during the quarter.   As disclosed separately at the time, after the quarter‐end a protected strike by certain employees of Murray & Roberts Cementation (Proprietary) Limited (“MRC”), a mining contractor to AQPSA, occurred at the Everest Mine. The strike was called by the Association of Mining and Construction Unions (“AMCU”), which is demanding full organisational rights from MRC in terms of the South African Labour Relations Act. This is a dispute between AMCU and MRC, and no demands are being made by AMCU of Aquarius or its subsidiaries. The strike was ended by AQPSA coming to an interim arrangement with AMCU while their dispute with MRC continues. As a consequence of the strike, Everest was unable to operate for in excess of two weeks.  AQPSA Operating costs per ounce 

  

4E  6E  6E net of by‐products 

(Pt+Pd+Rh+Au)  (Pt+Pd+Rh+Ir+Ru+Au)  (Ni&Cu) 

Kroondal  8,507  6,966  6,832 

Marikana  10,098  8,294  8,091 

Everest  9,775  8,141  7,695  Capital expenditure Ongoing capital expenditure remained at normal operating levels but project capital remained higher than usual this quarter with the sinking operations at K6 shaft.  

   Kroondal  Marikana  Everest 

 (R’000 unless otherwise stated)  Total   Per 4E oz  Total  Per 4E oz  Total  Per 4E oz 

Ongoing Infrastructure Establishment  57,857  651  18,609  716  44,967  1,949

Project Capital  36,564  411  250  10  483  21

Mobile Equipment  15,988  180  11,950  460  1,356  59

Total  110,409  1,242  30,808  1,185  46,806  2,029    

For

per

sona

l use

onl

y

Page 15: First Quarter 2012 Financial and Production Results · First Quarter 2012 Financial and Production Results First Quarter 2012 Financial and Production Results: 30 September 2011 Page

First Quarter 2012 Financial and Production Results

First Quarter 2012 Financial and Production Results: 30 September 2011 www.aquariusplatinum.com Page 15 of 26

 MIMOSA INVESTMENTS (Aquarius Platinum ‐ 50%)  Mimosa Platinum Mine  12‐month  rolling  average  DIIR  fell  slightly  to  0.06  per  200,000 man  hours, with  three  lost‐time  injuries 

recorded  Production increased by 1% to 603,609 tonnes  Head grade deteriorated by 1% to 3.64g/t  Recoveries were stable at 78%  Volumes processed decreased by 2% to 592,056 tonnes  Stockpiles at the end of the quarter totalled approximately 159,184 tonnes    PGM production decreased by 3% to 53,798 PGM ounces  Revenue decreased by 24% to $75.6 million due to lower metal prices achieved during the quarter   Mining cash costs decreased by 9% to $67 per tonne, and costs per PGM ounce by 8% to $734  Stay‐in‐business capital expenditure was $301 per PGM ounce for the quarter  Mimosa’s cash margin for the period fell from 55% to 50% 

 Commentary The 9% decrease in cash costs quarter‐on‐quarter was attributable to various cost management initiatives being implemented by management as well as lower off‐mine costs. Off‐mine costs such as royalties, commissions and technical fees vary directly with sales and these were lower than the previous quarter as a result of lower sales revenue due to depressed metal prices.  The  significant  increase  in  stay‐in‐business  capital  expenditure  quarter‐on‐quarter  arose  because  44%  of  the approved capital budget for the 2012 financial year was spent in the first quarter on productive equipment with long lead times.  Operating cash costs per ounce 

 4E 

(Pt+Pd+Rh+Au) 6E

(Pt+Pd+Rh+Ir+Ru+Au) 4E net of by‐products

(Ni, Cu & Co) 

Mimosa  734  696  344 

  Indigenisation and Economic Empowerment  Discussions are ongoing between the various interested parties in order to ensure that a suitable Indigenisation proposal is developed. It is anticipated that the final Indigenisation Implementation Plan will be submitted to the Zimbabwean Minister of Youth Development, Indigenisation and Economic Empowerment during the second quarter of FY2012.     

For

per

sona

l use

onl

y

Page 16: First Quarter 2012 Financial and Production Results · First Quarter 2012 Financial and Production Results First Quarter 2012 Financial and Production Results: 30 September 2011 Page

First Quarter 2012 Financial and Production Results

First Quarter 2012 Financial and Production Results: 30 September 2011 www.aquariusplatinum.com Page 16 of 26

TAILINGS OPERATIONS Chromite Tailings Retreatment Plant (CTRP) (Aquarius Platinum ‐ 50%)  Material processed increased 128% to 70 tonnes  Head grade increased to 2.88 g/t  Recoveries decreased by 54% to 11%  Production decreased to 661 PGM ounces   Cash costs increased by 29% to R16,223 per PGM ounce  Revenue was R2 million for the quarter  CTRP had a negative cash margin for the period of 516%, down from negative 173% in the previous quarter  Platinum Mile (Aquarius Platinum – 91.70%)  Material processed increased 24% to 1,244 million tonnes  Head grade fell to 0.52 g/t  Recoveries decreased by 32% to15%  Production decreased to 3,087 PGM ounces   Cash costs increased by 40% to R7,723 per PGM ounce  Revenue was R31 million for the quarter  The cash margin for the period was 22%, a decrease from 31% in the previous quarter  Commentary CTRP: Dump material was  secured during  the prior year because of diminishing  tailings  supply  from external providers.  It was necessary  to modify  the plant  to accept  this  type of material. A  scrubber was consequently installed  and  commissioning was  completed  at  the  end  of  July  2011  and  the  volumes  processed  increased significantly  for  the quarter. Process optimisation  is ongoing and as a  result  recoveries were poor during  the period under review.    Platinum Mile: Production volumes and recoveries at PlatMile are highly sensitive to the grade of feed material treated at the plant, which is currently beyond management control. The current quarter saw a 20% decrease in the plant feed grade, resulting in the ounces produced declining by 34%. The completion of Aquarius’ acquisition of a further 41.7% of PlatMile became effective during the quarter and as a result PlatMile is now consolidated in the accounts of Aquarius and 100% of its production became attributable as of 1 September. 

Operating cash costs per ounce 

 4E 

(Pt+Pd+Rh+Au) 6E

(Pt+Pd+Rh+Ir+Ru+Au) 4E net of by‐products

(Ni, Cu& Co) 

CTRP  16,223  14,853 14,707 Platinum Mile  7,723  6,658 6,006 

     

For

per

sona

l use

onl

y

Page 17: First Quarter 2012 Financial and Production Results · First Quarter 2012 Financial and Production Results First Quarter 2012 Financial and Production Results: 30 September 2011 Page

First Quarter 2012 Financial and Production Results

First Quarter 2012 Financial and Production Results: 30 September 2011 www.aquariusplatinum.com Page 17 of 26

Statistical Information: Kroondal P&SA1   

   

Current Previous Change Current Previous Change

UnitQuarter

Sep 2011Quarter

Jun 2011Quarter on

Quarter3 months Sep 2011

3 months Sep 2010

Period on Period

Safety

DIIR 200,000 man hrs 0.63 0.77 18 0.63 0.78 19 Revenue

Gross Revenue R'M 766 764 0.3 766 922 (17)PGM basket Price $/oz 1,480 1,519 (3) 1,480 1,307 13 Gross cash margin % 1 15 (91) 1 28 (95)Nickel Price $/lb 10.01 11.02 (9) 10.01 9.61 4 Copper Price $/lb 4.08 4.15 (2) 4.08 3.29 24 Ave R/$ rate 7.01 6.80 3 7.01 7.40 (5)Cash Costs on-mine

R/ton 512 452 13 512 409 25 $/ton 73 66 10 73 55 33 R/oz 8,507 7,277 17 8,507 6,037 41 $/oz 1,213 1,070 13 1,213 816 49 R/oz 6,966 5,941 17 6,966 4,938 41 $/oz 994 874 14 994 667 49

Capital Expenditure

R'000s 94,420 113,752 (17) 94,420 59,061 60 $'000s 13,468 16,731 (20) 13,468 7,980 69 R'000s - - - - - - $'000s - - - - - -

Tons Mined

Underground ROM Ton '000 1,483 1,425 4 1,483 1,619 (8)Open Pit ROM Ton '000 - - - - - - Total ROM Ton '000 1,483 1,425 4 1,483 1,619 (8)Surface Stockpiles

Underground Ore ROM Ton '000 20 14 42 20 44 (55)Open Pit Ore ROM Ton '000 - - - - - - Total ROM Ton '000 20 14 42 20 44 (55)Tons Processed

Underground ROM Ton '000 1,478 1,436 3 1,478 1,631 (9)Open Pit ROM Ton '000 - - - - - - Total ROM Ton '000 1,478 1,436 3 1,478 1,631 (9)Grade

Plant Head g/t 2.39 2.46 (3) 2.39 2.62 (9)Recoveries % 78 79 (0) 78 81 (3)PGM Production

Platinum Ozs 52,501 52,452 0 52,501 65,068 (19)Palladium Ozs 26,354 26,561 (1) 26,354 32,901 (20)Rhodium Ozs 9,608 9,766 (2) 9,608 12,057 (20)Gold Ozs 444 416 7 444 548 (19)Total PGM (3E+Au) Ozs 88,908 89,196 (0) 88,908 110,575 (20)Iridium Ozs 3,744 3,813 (2) 3,744 4,680 (20)Ruthenium Ozs 15,923 16,254 (2) 15,923 19,921 (20)Total PGE (5E+Au) Ozs 108,574 109,262 (1) 108,574 135,176 (20)Base Metals Production

Nickel Tonnes 96 100 (4) 96 123 (22)Copper Tonnes 44 44 0 44 53 (17)Chromite (000) Tonnes 42 51 (17) 42 84 (50)

Current/Sustaining 100%

Expansion 100%

Data reflects 100% of mine operations

Per ROM ton

Per PGM oz (3E+Au)

Per PGE (5E+Au)

For

per

sona

l use

onl

y

Page 18: First Quarter 2012 Financial and Production Results · First Quarter 2012 Financial and Production Results First Quarter 2012 Financial and Production Results: 30 September 2011 Page

First Quarter 2012 Financial and Production Results

First Quarter 2012 Financial and Production Results: 30 September 2011 www.aquariusplatinum.com Page 18 of 26

Statistical Information: Marikana P&SA2   

      

Current Previous Change Current Previous Change

UnitQuarter

Sep 2011Quarter

Jun 2011Quarter on

Quarter3 months Sep 2011

3 months Sep 2010

Period on Period

Safety

DIIR 200,000 man hrs 0.30 0.48 37 0.30 0.76 60 Revenue

Gross Revenue R'M 230 189 22 230 240 (4)PGM basket Price $/oz 1,488 1,523 (2) 1,488 1,306 14 Gross cash margin % (14) (6) 131 (14) (1) 1,306 Nickel Price $/lb 10.01 11.02 (9) 10.01 9.61 4 Copper Price $/lb 4.08 4.15 (2) 4.08 3.29 24 Ave R/$ rate 7.01 6.80 3 7.01 7.40 (5)

Cash Costs on-mine

R/ton 562 498 13 562 477 18 $/ton 80 73 9 80 65 23 R/oz 10,098 9,355 8 10,098 8,752 15 $/oz 1,440 1,376 5 1,440 1,183 22 R/oz 8,294 7,649 8 8,294 7,195 15 $/oz 1,183 1,125 5 1,183 972 22

Capital Expenditure

R'000s 18,858 25,604 (26) 18,858 60,352 (69)$'000s 2,690 3,766 (29) 2,690 8,154 (67)R'000s 3,495 - - 3,495 - - $'000s 498 - - 498 - -

Tons Mined

Underground ROM Ton '000 477 403 18 477 401 19 Open Pit ROM Ton '000 - - - - 112 (100)Total ROM Ton '000 477 403 18 477 513 (7)Surface Stockpiles

Underground Ore ROM Ton '000 16 6 148 16 22 (29)Open Pit Ore ROM Ton '000 - - - - 2 (100)Total ROM Ton '000 16 6 148 16 24 (35)Tons Processed

Underground ROM Ton '000 467 402 16 467 388 20 Open Pit ROM Ton '000 - - - - 120 (100)Total ROM Ton '000 467 402 16 467 509 (8)Grade

Plant Head g/t 2.30 2.24 3 2.30 2.48 (7)Recoveries % 75 74 2 75 69 9 PGM Production

Platinum Ozs 15,600 12,828 22 15,600 16,544 (6)Palladium Ozs 7,471 6,181 21 7,471 8,160 (8)Rhodium Ozs 2,783 2,287 22 2,783 2,887 (4)Gold Ozs 139 114 22 139 165 (16)Total PGM (3E+Au) Ozs 25,993 21,411 21 25,993 27,756 (6)Iridium Ozs 1,720 910 89 1,720 1,119 54 Ruthenium Ozs 3,933 3,862 2 3,933 4,891 (20)Total PGE (5E+Au) Ozs 31,646 26,183 21 31,646 33,766 (6)Base Metals Production

Nickel Tonnes 30 25 19 30 41 (28)Copper Tonnes 15 14 13 15 31 (50)Chromite (000) Tonnes (000) 35 38 (9) 35 29 19

Current/Sustaining 100%

Expansion 100%

Data reflects 100% of mine operations

Per ROM ton

Per PGM oz (3E+Au)

Per PGE (5E+Au)

For

per

sona

l use

onl

y

Page 19: First Quarter 2012 Financial and Production Results · First Quarter 2012 Financial and Production Results First Quarter 2012 Financial and Production Results: 30 September 2011 Page

First Quarter 2012 Financial and Production Results

First Quarter 2012 Financial and Production Results: 30 September 2011 www.aquariusplatinum.com Page 19 of 26

Statistical Information: Everest   

         

Current Previous Change Current Previous Change

UnitQuarter

Sep 2011Quarter

Jun 2011Quarter on

Quarter3 months Sep 2011

3 months Sep 2010

Period on Period

Safety

DIIR 200,000 man hrs 1.28 0.41 (213) 1.28 0.18 (610)Revenue

Gross Revenue R'M 213 245 (13) 213 191 12 PGM basket Price $/oz 1,460 1,484 (2) 1,460 1,265 15 Gross cash margin % (6) 10 (156) (6) 4 (246)Nickel Price $/lb 10.01 11.02 (9) 10.01 9.61 4 Copper Price $/lb 4.08 4.15 (2) 4.08 3.29 24 Ave R/$ rate 7.01 6.80 3 7.01 7.40 (5)Cash Costs on-mine

R/ton 689 580 19 689 610 13 $/ton 98 85 15 98 82 20 R/oz 9,775 8,128 20 9,775 8,981 9 $/oz 1,394 1,195 17 1,394 1,213 15 R/oz 8,141 6,791 20 8,141 7,489 9 $/oz 1,161 999 16 1,161 1,012 15

Capital Expenditure

R'000s 45,450 38,714 17 45,450 21,819 108 $'000s 6,483 5,694 14 6,483 2,948 120 R'000s - 3,588 (100) - 42,242 (100)$'000s - 528 (100) - 5,707 (100)

Tons Mined

Underground ROM Ton '000 326 369 (11) 326 256 27 Surface Stockpiles - Underground ROM Ton '000 2 3 (30) 2 6 (60)Tons Processed - Underground ROM Ton '000 327 378 (13) 327 300 9 Grade - Plant Head g/t 2.57 2.62 (2) 2.57 2.75 (7)Recoveries % 85 85 1 85 77 11 PGM Production

Platinum Ozs 13,336 15,493 (14) 13,336 11,902 12 Palladium Ozs 7,248 8,541 (15) 7,248 6,403 13 Rhodium Ozs 2,288 2,672 (14) 2,288 1,916 19 Gold Ozs 202 247 (18) 202 196 3 Total PGM (3E+Au) Ozs 23,074 26,954 (14) 23,074 20,417 13 Iridium Ozs 835 959 (13) 835 709 18 Ruthenium Ozs 3,795 4,347 (13) 3,795 3,357 13 Total PGE (5E+Au) Ozs 27,705 32,260 (14) 27,705 24,483 13 Base Metals Production

Nickel Tonnes 40 50 (20) 40 38 5 Copper Tonnes 22 28 (22) 22 18 23 Chromite (000) Tonnes (000) 27 16 66 27 30 (9)

Current/Sustaining 100%

Expansion 100%

Data reflects 100% of mine operations

Per ROM ton

Per PGM oz (3E+Au)

Per PGE (5E+Au)

For

per

sona

l use

onl

y

Page 20: First Quarter 2012 Financial and Production Results · First Quarter 2012 Financial and Production Results First Quarter 2012 Financial and Production Results: 30 September 2011 Page

First Quarter 2012 Financial and Production Results

First Quarter 2012 Financial and Production Results: 30 September 2011 www.aquariusplatinum.com Page 20 of 26

Statistical Information: Mimosa   

     

Current Previous Change Current Previous Change

UnitQuarter

Sept 2011Quarter

June 2011Quarter on

Quarter3 months Sept 2011

3 months Sept 2010

Period on Period

Safety

DIIR 200,000 man hrs 0.27 - - 0.27 0.09 (195)

Revenue

Gross Revenue $M 75.60 99 (24) 75.60 76.18 (1)PGM basket Price $/oz 1,374 1,392 (1) 1,374 1,144 20 Gross cash margin % 50.17 55 (9) 50.17 57.31 (12)Nickel Price $/lb 10.48 12.14 (14) 10.48 9.13 15 Copper Price $/lb 4.18 4.33 (3) 4.18 3.05 37

Cash Costs

Per Rom ton $/ton 67 73 9 67 54 (23)Per PGM ounce 3E+Au $/oz 734 800 8 734 595 (23)

(after by-product credit) $/oz 352 237 (49) 352 245 (44)Per 6 PGM ounce 5E+Au $/oz 696 757 8 696 563 (24)

(after by-product credit) $/oz 344 235 (47) 344 242 (42)

Capital Expenditure

Current $ ' 000s 16,200 7,247 (124) 16,200 12,504 (30)Expansion $ ' 000s 612 606 (1) 612 2,666 77

Mining

Underground RoM ton '000 604 596 1 604 653 (8)

Surface Stock Piles

Underground ton '000 159.184 147.631 8 159.184 130.715 22

Tonnes Processed

Milled ton '000 592 607 (2) 592 594 (0)

Grade

Plant Head g/t 3.64 3.67 (1) 3.64 3.63 0 Recoveries % 78 78 0 78 78 (0)

PGM Production

Platinum Ozs 27,086 27,978 (3) 27,086 27,349 (1)Palladium Ozs 20,904 21,604 (3) 20,904 20,829 0 Rhodium Ozs 2,181 2,224 (2) 2,181 2,174 0 Gold Ozs 3,627 3,799 (5) 3,627 3,781 (4)Total PGM (3E+Au) Ozs 53,798 55,605 (3) 53,798 54,133 (1)Ruthenium Ozs 1,943 2,053 (5) 1,943 2,023 (4)Iridium Ozs 1,004 1,051 (4) 1,004 1,046 (4)

Total PGE (5E+Au) Ozs 56,746 58,710 (3) 56,746 57,203 (1)

Base Metals Production

Nickel Tons 780 817 (5) 780 759 3 Copper Tons 611 653 (6) 611 618 (1)Cobalt Tons 22 22 1 22 23 (4)

Data reflects 100% of mine operations

For

per

sona

l use

onl

y

Page 21: First Quarter 2012 Financial and Production Results · First Quarter 2012 Financial and Production Results First Quarter 2012 Financial and Production Results: 30 September 2011 Page

First Quarter 2012 Financial and Production Results

First Quarter 2012 Financial and Production Results: 30 September 2011 www.aquariusplatinum.com Page 21 of 26

Statistical Information: Chrome Tailings Retreatment Plant   

  

Current Previous Change Current Previous Change

UnitQuarter

Sep 2011Quarter

Jun 2011Quarter on

Quarter3 months Sep 2011

3 months Sep 2010

Period on Period

Safety

DIIR 200,000 man hrs - - - - - Revenue

Gross Revenue R'M 2 3 (37) 2 10 (80)PGM basket Price $/oz 1,535 1,636 (6) 1,535 1,426 8 Gross cash margin % (516) (173) 198 (516) 17 (3,134)Nickel Price $/lb 9.21 11.02 (16) 9.21 9.61 (4)Copper Price $/lb 3.69 4.15 (11) 3.69 3.29 12 Ave R/$ rate 7.00 6.80 3 7.00 7.34 (5)Cash Costs on-mine

R/ton 154 280 (45) 154 193 (20)$/ton 22 41 (47) 22 26 (16)R/oz 16,223 12,572 29 16,223 5,504 195 $/oz 2,318 1,849 25 2,318 750 209 R/oz 14,853 10,372 43 14,853 3,760 295 $/oz 2,122 1,526 39 2,122 512 314

Capital Expenditure

R'000s 2,488 1,907 30 2,488 1,425 75 $'000s 355 280 27 355 194 83 R'000s - - - - - $'000s - - - - -

Tons Mined

Underground ROM Ton '000 nm nm - nm nm - Open Pit ROM Ton '000 nm nm - nm nm - Total ROM Ton '000 nm nm - nm nm - Surface Stockpiles

Underground Ore ROM Ton '000 nm nm - nm nm - Open Pit Ore ROM Ton '000 nm nm - nm nm - Total ROM Ton '000 nm nm - nm nm - Tons Processed

Underground ROM Ton '000 nm nm - nm nm - Open Pit ROM Ton '000 70 31 128 70 42 67 Total ROM Ton '000 70 31 128 70 42 67 Grade

Plant Head g/t 2.88 2.90 (1) 2.88 2.72 6 Recoveries % 11 24 (54) 11 40 (73)PGM Production

Platinum Ozs 409 426 (4) 409 903 (55)Palladium Ozs 143 144 (1) 143 316 (55)Rhodium Ozs 108 114 (5) 108 248 (57)Gold Ozs 2 2 (9) 2 3 (44)Total PGM (3E+Au) Ozs 661 685 (3) 661 1,470 (55)Iridium Ozs - - - - - - Ruthenium Ozs 61 87 (30) 61 557 (89)Total PGE (5E+Au) Ozs 722 830 (13) 722 2,027 (64)Base Metals Production

Nickel Tonnes 1 0 29 1 2 (68)Copper Tonnes 0 1 (57) 0 1 (74)Chromite (000) Tonnes (000) - - - - - -

Current/Sustaining 100%

Expansion 100%

Data reflects 100% of mine operations

Per ROM ton

Per PGM oz (3E+Au)

Per PGE (5E+Au)

For

per

sona

l use

onl

y

Page 22: First Quarter 2012 Financial and Production Results · First Quarter 2012 Financial and Production Results First Quarter 2012 Financial and Production Results: 30 September 2011 Page

First Quarter 2012 Financial and Production Results

First Quarter 2012 Financial and Production Results: 30 September 2011 www.aquariusplatinum.com Page 22 of 26

Statistical Information: Platinum Mile   

     

Current Previous Change Current Previous Change

UnitQuarter

Sep 2011Quarter

Jun 2011Quarter on

Quarter3 months Sep 2011

3 months Sep 2010

Period on Period

Safety

DIIR 200,000 man hrs - - - - 1.47 100 Revenue

Gross Revenue R'M 31 38 (18) 31 31 - PGM basket Price $/oz 1,438 1,487 (3) 1,438 1,300 11 Gross cash margin % 22 31 (29) 22 25 (12)Nickel Price $/lb 9.21 10.10 (9) 9.21 10.23 (10)Copper Price $/lb 3.69 4.02 (8) 3.69 3.42 8 Ave R/$ rate 7.14 6.79 5 7.14 7.32 (2)Cash Costs on-mine

R/ton 19 26 (27) 19 21 (8)$/ton 3 4 (31) 3 3 (6)R/oz 7,723 5,521 40 7,723 5,908 31 $/oz 1,082 813 33 1,082 807 34 R/oz 6,658 4,760 40 6,658 5,093 31 $/oz 932 701 33 932 696 34

Capital Expenditure

R'000s 959 - - 959 352 172 $'000s 134 - - 134 48 179 R'000s - - - - 315 (100)$'000s - - - - 43 (100)

Tons Mined

Underground ROM Ton '000 nm nm - nm nm - Open Pit ROM Ton '000 nm nm - nm nm - Total ROM Ton '000 nm nm - nm nm - Surface Stockpiles

Underground Ore ROM Ton '000 nm nm - nm nm - Open Pit Ore ROM Ton '000 nm nm - nm nm - Total ROM Ton '000 nm nm - nm nm - Tons Processed

Underground ROM Ton '000 nm nm - nm nm - Open Pit ROM Ton '000 1,224 991 24 1,224 1,118 9 Total ROM Ton '000 1,224 991 24 1,224 1,118 9 Grade

Plant Head g/t 0.52 0.65 (20) 0.52 0.63 (17)Recoveries % 15 22 (32) 22 17 29 PGM Production

Platinum Ozs 1,807 2,755 (34) 1,807 2,246 (20)Palladium Ozs 944 1,436 (34) 944 1,221 (23)Rhodium Ozs 244 412 (41) 244 313 (22)Gold Ozs 92 91 1 92 143 (36)Total PGM (3E+Au) Ozs 3,087 4,694 (34) 3,087 3,923 (21)Iridium Ozs nm nm - nm nm - Ruthenium Ozs 494 1,616 (69) 494 628 (21)Total PGE (5E+Au) Ozs 3,581 6,310 (43) 3,581 4,551 (21)Base Metals Production

Nickel Tonnes 22 24 (6) 22 27 (18)Copper Tonnes 7 9 (18) 7 11 (32)Chromite (000) Tonnes (000) nm nm - nm nm -

Current/Sustaining 100%

Expansion 100%

Data reflects 100% of mine operations

Per ROM ton

Per PGM oz (3E+Au)

Per PGE (5E+Au)

For

per

sona

l use

onl

y

Page 23: First Quarter 2012 Financial and Production Results · First Quarter 2012 Financial and Production Results First Quarter 2012 Financial and Production Results: 30 September 2011 Page

First Quarter 2012 Financial and Production Results

First Quarter 2012 Financial and Production Results: 30 September 2011 www.aquariusplatinum.com Page 23 of 26

CORPORATE MATTERS  Agreement with Anglo American Platinum regarding Siphumele 3 AQPSA and Anglo American Platinum Limited (“Amplats”) have entered into an agreement  in terms of which the Siphumelele 3 Shaft and its remaining UG2 resources has been moved from Amplats’ Rustenburg operations to the existing P&SA arrangements currently operating at the Kroondal and Marikana mines.  Siphumelele 3 shaft is a first generation vertical shaft situated on the boundary of the current Kroondal and Marikana mining areas. In 2009 Amplats placed the shaft on care and maintenance, after mining out the Merensky Reef in the area. The Siphumelele 3 mining area will form part of the P&SAs for four years from 1 July 2011 or until mined out, whichever is sooner.  AQPSA will extract the remaining UG2 reef at the Siphumelele 3 mining area. Approximately 70% of the remaining UG2 ore reserves will be mined via the Siphumelele 3 shaft itself, which will be re‐commissioned and used to hoist approximately 55,000 tons per month of PGM ore, and to transport workers and materials. This ore will subsequently be delivered to the Marikana concentration plant, which has excess capacity and dense media separation (DMS) capability. The remaining 30% of the ore will be mined via Kroondal’s Bambanani shaft, and processed at Kroondal.  Wage settlement with the National Union of Mineworkers (NUM) AQPSA and MRC have successfully concluded a 2‐year wage agreement with NUM in terms of which workers at Aquarius’ South African mines will receive a headline wage increase, reduced working hours, an increased contribution to their provident funds and an increased Living Out allowance. The total increase in the cost to company will be 8.17% in the first year and 8.3% in the second. This settlement will be back‐dated to 1 July 2011.   Convertible Bonds On 29 September 2011 Aquarius repurchased two tranches of its outstanding Convertible Bonds due Dec 2015. Each tranche had a face value of $1 million and was repurchased at $0.94 million. Aquarius does not have a buy back policy but may repurchase bonds infrequently when the opportunity presents itself.  

More information on all corporate matters can be found at www.aquariusplatinum.com  

    

For

per

sona

l use

onl

y

Page 24: First Quarter 2012 Financial and Production Results · First Quarter 2012 Financial and Production Results First Quarter 2012 Financial and Production Results: 30 September 2011 Page

First Quarter 2012 Financial and Production Results

First Quarter 2012 Financial and Production Results: 30 September 2011 www.aquariusplatinum.com Page 24 of 26

Aquarius Platinum Limited Incorporated in Bermuda Exempt company number 26290  Board of Directors Nicholas Sibley    Non‐executive Chairman Stuart Murray    Chief Executive Officer David Dix    Non‐executive Tim Freshwater    Non‐executive Edward Haslam    Non‐executive Sir William Purves    Non‐executive (Senior Independent Director) Kofi Morna    Non‐executive Zwelakhe Mankazana    Non‐executive  Audit/Risk Committee Sir William Purves (Chairman) David Dix Edward Haslam Kofi Morna Nicholas Sibley  Remuneration/Succession Planning Committee Edward Haslam (Chairman) David Dix Zwelakhe Mankazana Nicholas Sibley  Nomination Committee The full Board comprises the Nomination Committee  Company Secretary Willi Boehm  Investor Relations Gavin Mackay      Business Development & Communications Executive  AQPSA Management Stuart Murray      Executive Chairman Anton Lubbe      Managing Director Hélène Nolte      Director: Finance Mkhululi Duka      Director: Human Capital Abraham van Ghent    Senior General Manager: Operations Graham Ferreira      General Manager: Group Admin & Company Secretary Wessel Phumo      General Manager: Kroondal Jenkins Kroon      Acting General Manager: Marikana Augustine Simbanegavi    General Manager: Everest Anthony Joubert      General Manager: Blue Ridge Jan Hattingh      General Manager: Engineering Radesh Sukhdeo      General Manager: Process & Environmental Dave Starley      General Manager: Projects  Mimosa Mine Management Winston Chitando       Managing Director Herbert Mashanyare     Technical Director Peter Chimboza       Resident Director Fungai Makoni       General Manager Finance & Company Secretary  Platinum Mile Management Richard Atkinson       Managing Director Paul Swart       Financial Director  

For

per

sona

l use

onl

y

Page 25: First Quarter 2012 Financial and Production Results · First Quarter 2012 Financial and Production Results First Quarter 2012 Financial and Production Results: 30 September 2011 Page

First Quarter 2012 Financial and Production Results

First Quarter 2012 Financial and Production Results: 30 September 2011 www.aquariusplatinum.com Page 25 of 26

Issued Capital At 30 September 2011, the Company had in issue: 470,167,206 fully paid common shares and 265,372 unlisted options.    

Substantial Shareholders 30 September 2011  Number of Shares  Percentage 

Savannah Consortium  63,254,371  13.45 

JP Morgan Nominees Australia Limited  44,728,165  9.51 

HSBC Custody Nominees (Australia) Limited  38,627,667  8.22 

National Nominees Limited  32,57,596  6.93 

 Main Listing:  Australian Securities Exchange (AQP.AX)  Trading Information Secondary Listing:  London Stock Exchange (AQP.L)  ISIN number BMG0440M1284 Secondary Listing:  JSE Limited (AQP.ZA)  ADR ISIN number US03840M2089     Convertible Bond ISIN number XS0470482067  Broker (LSE) (Joint)  Broker (ASX)  Sponsor (JSE) 

Liberum Capital Limited City Point, 1 Ropemaker Street, London, EC2Y 9HT Telephone: +44 (0) 20 3100 2000 Bank of America Merrill Lynch 2 King Edward St London, EC1A 1HQ Telephone: +44 (0)20 7628 1000 

Euroz Securities Level 18 Alluvion 58 Mounts Bay Road,  Perth WA 6000 Telephone: +61 (0) 8 9488 1400    

Rand Merchant Bank  (A division of FirstRand Bank Limited)  1 Merchant Place  Cnr of Rivonia Rd and Fredman Drive, Sandton 2146  Johannesburg South Africa  

Aquarius Platinum (South Africa) (Proprietary) Ltd 

100% Owned  (Incorporated in the Republic of South Africa) Registration Number 2000/000341/07  1st Floor, Building 5, Harrowdene Office Park, Western Service Road, Woodmead 2191, South Africa Postal Address:  PO Box 76575, Wendywood, 2144, South Africa. Telephone:  +27 (0)11 656 1140 Facsimile:  +27 (0)11 802 0990 

 Aquarius Platinum Corporate Services Pty Ltd 

100% Owned (Incorporated in Australia) ACN 094 425 555  Level 4, Suite 5, South Shore Centre, 85 The Esplanade, South Perth, WA 6151, Australia Postal Address:  PO Box 485, South Perth, WA 6151, Australia Telephone:  +61 (0)8 9367 5211 Facsimile:  +61 (0)8 9367 5233 Email:  [email protected]  For further information please visit www.aquariusplatinum.com or contact: 

 

In Australia Willi Boehm +61 (0) 8 9367 5211  In the United Kingdom and South Africa Gavin Mackay [email protected] + 44 7909 547 042 

For

per

sona

l use

onl

y

Page 26: First Quarter 2012 Financial and Production Results · First Quarter 2012 Financial and Production Results First Quarter 2012 Financial and Production Results: 30 September 2011 Page

First Quarter 2012 Financial and Production Results

First Quarter 2012 Financial and Production Results: 30 September 2011 www.aquariusplatinum.com Page 26 of 26

Glossary A$      Australian Dollar 

Aquarius or AQP    Aquarius Platinum Limited 

APS      Aquarius Platinum Corporate Services Pty Ltd 

AQPSA      Aquarius Platinum (South Africa) (Pty) Ltd 

ACS(SA)      Aquarius Platinum (SA) Corporate Services (Pty) Ltd 

BEE      Black Economic Empowerment 

BRPM      Blue Ridge Platinum Mine 

CTRP    Chrome  Tailings  Retreatment  Operation.  Consortium  comprising  Aquarius  Platinum  (SA) 

(Corporate Services)  (Pty) Limited  (ASACS),  Ivanhoe Nickel and Platinum Limited and Sylvania 

South Africa (Pty) Ltd (SLVSA). 

DIFR    Disabling injury frequency rate ‐ being the number of lost‐time injuries expressed as a rate per 

1,000,000 man‐hours worked 

DIIR    Disabling injury incidence rate ‐ being the number of lost‐time injuries expressed as a rate per 

200,000 man‐hours worked 

DME      formerly South African Government Department of Minerals and Energy  

DMR    South African Government Department of Mineral Resources, formerly the DME 

Dollar or $      United States Dollar 

Everest    Everest Platinum Mine 

Great Dyke Reef    A PGE bearing layer within the Great Dyke Complex in Zimbabwe 

g/t    Grams per tonne, measurement unit of grade (1g/t = 1 part per million) 

JORC code      Australasian code for reporting of Mineral Resources and Ore Reserves 

JSE      JSE Limited 

Kroondal      Kroondal Platinum Mine or P&SA1 at Kroondal 

LHD      Load haul dump machine 

Marikana    Marikana Platinum Mine or P&SA2 at Marikana 

Mimosa    Mimosa Mining Company (Private) Limited 

nm    Not measured 

PGE(s) (6E)    Platinum group elements plus gold.   Five metallic elements  commonly  found  together which constitute the platinoids (excluding Os (osmium)).  These are Pt (platinum), Pd (palladium), Rh (rhodium), Ru (ruthenium), Ir (iridium) plus Au (gold) 

PGM(s) (4E)    Platinum group metals plus gold.   Aquarius reports the PGMs as comprising Pt+Pd+Rh plus Au (gold) with the Pt, Pd and Rh being the most economic platinoids in the UG2 Reef 

PlatMile      Platinum Mile Resources (Pty) Ltd 

P&SA1      Pooling & Sharing Agreement between AQPSA and RPM Ltd on Kroondal 

P&SA2      Pooling & Sharing Agreement between AQPSA and RPM Ltd on Marikana 

R      South African Rand 

Ridge      Ridge Mining Limited 

ROM    Run  of mine.  The  ore  from mining which  is  fed  to  the  concentrator  plant.  This  is  usually  a mixture of UG2 ore and waste. 

Tonne      1 Metric tonne (1,000kg) 

UG2 Reef      A PGE‐bearing chromite layer within the Critical Zone of the Bushveld Complex  For