    TABLEOFCONTENTSSl.No. Item Page

    1 Preamble 1

    2 Part1Scope(Sections1To27) 14

    3

    Part2

    Consultancy

    Services

    Including

    That

    Of

    Fire

    Protection

    Experts

    /Specialists

    And

    Submittal Requirements For Obtaining Building Permit, Completion Certificate And

    ApprovalsRelatedTheretoAndShopDrawingApprovals&FitOutWorksRequirements)

    (Sections1To5)

    4

    5

    4 Part3RiskAssessmentStudyandFireRiskAssessmentRequirements(Sections1To4) 57

    5 Part4BuildingFireProtectionDesignfeatures&LifeSafetyRequirements(Sections1To

    16)

    716

    6 Part 5 Miscellaneous (Sections 1 To 30) dealing with (1) Criteria for storage

    configuration for JAFZAPBUs/LIUs,(2)HazardousAreaProtectionconcerningAssembly

    Occupancies,Hotels andDormitories, (3) Building Rehabilitation, (4) SafeguardsDuring

    Construction,(5)Temporarybuildings,facilitiesorstructuresatconstructionsitesforthe

    useof

    offices

    and

    labour

    accommodation,

    (6)

    Covered

    temporary

    structures

    Enclosed

    tentsnormallyusedforevents/activitiessuchasstageshows,concerts,circus,exhibitions,

    tradefairs,sportingevents&celebratoryfunctions,(7)Marinas&Boatyards,(8)Marine

    Terminals, Piers and Wharves, (9) Quality Assurance During Construction, (10)

    Performance BasedDesign (PBD), (11) Standby Power, (12) Basements, (13) Electrical

    Services/Systems,(14)MechanicalSystems,(15)AirConditioning,VentilationandSmoke

    Management Systems , (16) Transformers, (17) Stationery Combustion Engines, Gas

    Turbines&Generators,(18)GasService,(19)InformationTechnologyFacilities,(20)Utility

    Rooms,ShopAreas&IncidentalusePhases,(21)TrashDumpsters,(22)Laboratories,(23)

    Flammable&Combustible liquids, (24)AnimalHousingFacilities, (25)CollectionStorage

    Facilities, (26) Sign Boards and Name Plates for company premises, (27) Lightening

    Protection, (28) Mission Critical Facilities, (29) Fitout works /TIE IN Connections of

    Sprinklers,Standpipes,

    Fire

    Pumps

    and

    Fire

    Alarm

    Systems

    in

    Retails

    &

    Car

    park

    extensions

    and(30)Approvaloflistedfireproducts,equipment&systems.

    1622

    7 Part6Plans/FireLayoutDrawingsSubmittalRequirements(Sections1To2) 2224

    8 Part7 FirePreventionRequirements(Sections1To18) 2427

    9 Part8Fire/EmergencyControlRequirements(Sections1To21) 2730

    10 Part9CertificationAndApprovalrequirements (Sections1To2) 30

    11 Part10Definitions 30

    12 Appendix1ListOfActivitiesPermittedToBeCarriedOutInZoned/SectoredAreasOf

    PCFC/JAFZ.

    31 33

    13

    Appendix 2

    Submittal

    Requirements

    For

    Obtaining

    Building

    Permit,

    Completion

    CertificateAndApprovalsRelatedThereto.

    34

    37

    14 Appendix3Fire&ExplosionIndexAndToxicityIndex 3839

    15 Appendix4SubmissionofReportonFireProtection&LifeSafetyFeatures 4041

    16 Appendix5FireProtection/FireSafetyGuidelinesforDesigningHighRiseBuildings 4243

    17 Appendix6RequirementsConcerningFireDepartment VehicleAccess 4445

    18 Appendix7DimensionalCriteriaConcerningFireEscapeStairs,ExitWidthsEtc. 4648

  • 7/27/2019 fireprotectionfirepreventionfirecontrolregulations2010edition

    3/167

    - 2 -

    19 Appendix8OccupantLoadFactor 49

    20 Appendix9CommonPath,DeadEndAndTravelDistanceLimits 50

    21 Appendix10CriteriaForStorageConfigurationForJAFZPBUs/LIUs 51

    22 Appendix11SafeguardsagainstFires&ExplosionsduringConstruction 5254

    23 Appendix 12 Requirements For Temporary Buildings, Facilities Or Structures At

    ConstructionSites

    For

    The

    Use

    Of

    Offices

    &

    Labour

    Accommodation

    5556

    24 Appendix13EHSFireDeptRequirementsForCoveredTemporaryStructuresEnclosed

    Tents Normally Used For Events/Activities Such As Stage Shows,

    Concerts,Circus,Exhibitions,TradeFairs,SportingEvents&Celebratory

    Functions.

    5758

    25 Appendix14AirConditioning,Ventilation&SmokeManagementSystems 5961

    26 Appendix15MechanicalSmokeControlSystemSubmittalRequirements 6263

    27 Appendix16RequirementsForDesign,Installation,Testing,Certification&Maintenance

    ofLPG/LNGInstallation.

    6465

    28 Appendix17 RequirementsForLightningProtectionSystem 6667

    29 Appendix18 FireTrainingRequirements 68

    30 Appendix19 AvoidanceOfFalseAlarmsFromAutomaticSmokeDetectors 69

    31 Appendix20BuildingCompletionFireAlarmSystemTestCertificateFormat 7072

    32 Appendix21BuildingCompletionFireProtectionSystemTestCertificateFormat 7376

    33 Appendix22BuildingCompletionSmokeExhaustSystemTestCertificateFormat 7779

    34 Appendix23BuildingCompletionStairwellPressurizationSystemTestCertificate

    Format

    8082

    35 Appendix24BuildingCompletionFeaturesofConstructionTestCertificateFormat 83

    36

    Appendix25

    Building

    Completion

    Installation

    of

    Fire

    Rated

    Doors

    Test

    Certificate

    Format

    84

    37 Appendix26BuildingCompletionFireSeal/StopsFormat 85

    38 Appendix27DocumentsSubmissionSchedule(MEPServices) 86

    39 Appendix28RequirementsforDesignofFireWaterPumps 87

    40 Appendix29RequirementsforDesignofWaterTankFireWaterPumpRoom 88

    41 Appendix30RequirementsforDesignofPipes&ValvesFireWaterService 8990

    42 Appendix31RequirementsforDesignofFire&SmokeControlDoors 9192

    43 Appendix32RequirementsforDesignofElevatorsasperNFPA101 93

    44

    Appendix 33

    Specification

    for

    Pillar

    Hydrants

    94

    45 Appendix34SpecificationforUndergroundHydrants 95

    46 Appendix35 RequirementsforPortableFireExtinguishers 96

    47 Appendix36RequirementsforInstallationofFireAlarmSystems 9798

    48 Appendix37RequirementsforApplication,Installation,Location,Performanceand

    MaintenanceofFireAlarmSystem

    99100

    49 Appendix38 RequirementsforDesign,Installation&TestingofCleanAgent 101102

  • 7/27/2019 fireprotectionfirepreventionfirecontrolregulations2010edition

    4/167

    - 3 -

    ExtinguishingSystem

    50 Appendix39RequirementsforDesign,Installation&TestingofStandpipeAndHose

    System

    103104

    51 Appendix40RequirementsforDesign,Installation&TestingofSprinklerSystem 105106

    52 Appendix41RequirementsforDesign,Installation&TestingofHydrantSystem 107

    53

    Appendix42

    Requirements

    for

    Design,

    Installation

    &

    Testing

    of

    Water

    Mist

    System

    108

    54 Appendix43 Requirements forDesign,Installation&TestingofSmoke&Heat

    VentilationSystem

    109

    55 Appendix 44 BasicGuidelines for Sequence ofOperations for Life Safety Systems in

    HighRiseBuildings

    110

    56 Appendix45 ChecklistforFireProtectionPlanGeneralSubmittalRequirements 111113

    57 Appendix46 ChecklistforBusinessOccupanciesNew&ExistingGeneralSubmittal

    Requirements

    114124

    58 Appendix47 Checklist forApartmentBuildingsNew&ExistingGeneral Submittal

    Requirements

    125136

    59 Appendix 48 Checklist for Warehouses New & Existing General SubmittalRequirements

    137144

    60 Appendix 49 Checklist for Fire Alarm NFPA 72 Systems General Submittal

    Requirements

    145146

    61 Appendix50 ChecklistforFireSprinklersNFPA13SystemsGeneralSubmittal

    Requirements

    147148

    62 Appendix 51 Checklist for Fire Pumps NFPA 20 Systems General Submittal

    Requirements

    149151

    63 Appendix52RequirementsforTemporaryBuildings,Structures&Usesattheareassuch

    asTheWorldIslands

    152154

    64 Appendix53RequirementsforCollectionStorageFacilities 155 157

    65 Appendix54ListofOffences 158161

    66 Appendix55 DefinitionsOfTerms,Acronyms&Abbreviations 162 163

  • 7/27/2019 fireprotectionfirepreventionfirecontrolregulations2010edition

    5/167

    - 1 - - 1 -

    FIRE PROTECTION, FIRE PREVENTION & FIRE/EMERGENCY CONTROL

    REGULATIONS(Preamble)

    A)These regulations supersede and repeal the ones embodied in Planning &Construction Regulations for Control of Commercial Developments in Jebel

    Ali Free Zone Building And General Civil Work Construction Regulations

    Third Edition 2003 (Chapter 11). They are now published separately as

    part of Health, Safety and Fire Regulations; and hence shall be read in

    conjunction with all relevant provisions [concerning overall authority of

    Trakhees/EHS Division, sanctions & penalties and enforcement etc] of the

    latter.

    B)These regulations provide fire protection planning, design, construction,sustainment, restoration and modernization criteria. They will be

    periodically reviewed, updated and made available to users as part of EHS-

    Fire Depts responsibility for providing fire protection criteria &

    requirements to developers / lessees / licencees.

    C)These regulations are distributed electronically through websites:www.trakhees.ae; www.ehss.ae

    D)These regulations, having the force of law, are effective from the date ofissuance of their current (2010) electronic version / edition; and all

    stakeholders are obligated to comply with them strictly.

    E)Currency of hard/paper copies of these regulations shall be ensured by wayof doing minute checks against their current electronic version.

    Part1

    -Sections

    1

    to

    27

    (Scope)

    1. Theprovisionsoftheseregulationsestablishminimum fireprotectionrequirements/prescriptivecriteria for

    buildings,facilitiesorstructureswithinTrakhees/Ports,Customs&FreeZoneCorporation(PCFC)jurisdiction.

    Therequirements/criteriareflecttheneedfortheprotectionoflifeandpropertywhiletakingintoaccountthe

    assessed risksassociatedwith thebuildings, facilitiesor structures, theircontentsand*permittedactivities.

    (*Refer to Appendix1) and quality assurance includingmanagement of changes (refer to guideline notes

    followedbysection27)andsafeguardsbefore,duringandafterconstruction.

    2. Theprovisionsshallbeapplicabletoallnewandalltypesofexistingbuildings,facilitiesorstructuresandtheircontents and permitted activities whether considered permanent or temporary, mobile & stationary

    equipment,waterfrontfacilitiesandshoreprotectionforshipswithinTrakhees/PCFCjurisdiction.

    3. The provisions shall also be applicable to construction, alteration, repair, equipment, use and occupancy,

    maintenance,relocation&demolitionofanybuilding,facilityorstructureoranyappurtenancesconnectedor

    attachedtosuchbuildings,facilitiesorstructureswithinTrakhees/PCFCjurisdiction.

    4. Theprovisionsprimarilyaddressthoseconstruction,protectionandoccupancyfeaturesnecessarytominimize

    dangertolife&property.

    5. Allprovisionsarebasedalmoston functional requirementsanddonotencompassdetaileddimensionaland

    technicalspecifications.

    6. Theprovisionsaremandatory.Also,allrequirementsplacedhereunderateveryGuidelineNotesandtheones

  • 7/27/2019 fireprotectionfirepreventionfirecontrolregulations2010edition

    6/167

    - 2 - - 2 -

    containedinAppendicestotheseregulationsaremandatorywithrelationtotheprincipalmattertowhichthey

    standasrequirements.

    7. Theprovisionsshallbeusedconsistentlyasamandatoryreferencedocumentforthedevelopmentofdetaileddocuments (including scope,basisofdesign, technical requirements,plans,designdrawings&specifications

    etc.)bytheconsultingservices,includingthatoffireprotectionexperts/specialists,hiredbythestakeholders.

    Theprovisionsshallnotbeusedinlieuofdetaileddocumentsthatarerequiredtobesodeveloped.

    8. Trakhees/PCFChasadoptedbyreferenceNationalFireProtectionAssociation(NFPA)USAanditscompanion

    Codes,standardsandpublicationsincludingtheirofficialdefinitions,forapplicationoftheirprescriptivedesign

    criteria / requirementswithin Trakhees / PCFCjurisdiction. Accordingly, relevant provisions of themost

    currentNFPAcodes&standardsshallapplynormallytotheextentasprescribed.

    9. AHJ: (a) The term AuthorityHaving Jurisdiction (AHJ) as used inNFPA codes, standards and publications

    referenced intheseregulations indicatestheofficeofresponsibility i.e.EHSFireDepartment,asrepresented

    by itsofficers includingVicePresident/ChiefFireOfficerandhisdeputy forenforcing (i)therequirementsof

    NFPAanditscompanioncodes,standardsandpublications(ii)provisionsoftheseregulations(iii)requirements

    of EHSFireDepartment and (iv) applicable statutes and regulations ofUAE /DubaiGovernment; andVice

    President / Chief Fire Officer of EHSFire Dept is the person who is ultimately responsible to Trakhees /

    PCFC/EHSmanagementfortheenforcementoftheforegoingrequirements,statutes,rules&regulationsand

    forthedeliveryof fire,nonfireandemergencymedicalservices(i.e.ambulanceservices inaccordancewith

    DubaiGovernmentprotocol)withintheoptimumcapabilitiesofavailable resources. (b)VicePresident/Chief

    FireOfficer,cantherefore,reverse,rescindormodifyanyapproval(s)/decision(s)takenandcommunicatedbyanyofficerbelowhisrankincasesuchapprovalordecisionissubsequentlyfoundtobeerroneousontheface

    oftherecord. Nopartyshallbeentitledtothebenefitsofanysucherroneousapprovalordecision&(c)Inthe

    event that a conflict arises on a code application, Vice President / Chief Fire Officer shall make the

    determinationsonequivalencies,variancesandwaiversasapartofhiscodeinterpretation/administration/

    enforcement responsibilities. All such decisionsmade by him shall be final and binding for the concerned

    stakeholders.

    10.Certainrequirementsandrecommendations[thatmaynotbecovered inNFPAcodes/publications/standards]

    thatarenecessarilyrecommendedbytheEHS FireDepartmentonacasebycasebasisshallbecompliedwith

    notwithstandingmerecompliancewithNFPAcodes/publications/standards.

    11.Inthe

    event

    of

    any

    conflict

    between

    the

    text

    of

    the

    references

    cited

    herein

    in

    regard

    to

    NFPA

    and

    its

    companion codes, standards andpublications, the textof the relevantandapplicable codes, standards and

    publicationsshalltakeprecedence.

    12.Omission of any specific references or cross references, in regard to any NFPA and its companion codes,

    standardsandpublications,shallnotrelievethestakeholdersoftheirobligationtocomplyingwithsuchcodes,

    standardsandpublicationshavingregulatoryjurisdictioneffectandforce.

    13.Wherethesituationandthecontextwarrants,thestakeholders,includingtheconsultants,shallbeobligatedto

    gathertheexplicitinterpretationofthewordsofanyprovisionsoftheseregulationsfromEHSFireDept/AHJ

    andnot fromwhat theyprofess it tobewhen theyhave translated their selfassumptionor intention into

    requirements.

    14.Where appropriate relevant and current statutes and regulations of UAE/Dubai Governments shall be

    applicable.

    15.Equivalencies: (a) Equivalencies to any established prescriptive criteria of NFPA and its companion codes,

    standardsandpublications,theprovisionsoftheseregulationsmaybeapprovedbytheEHSFireDept/AHJ,if

    thealternativefireprotectionengineeringdesignprovidesanequivalentleveloffireprotectionandlifesafety.

    Writtenrequestsforapprovalshallincludejustification,hazardanalysis,criteriausedandotherpertinentdata

    (b)Lackof fundsand timedeadlinesofprojects shallnotbeconsidered sufficientjustification fordeviation

    fromtheestablishedcriteriarequirementsandprovisions& (c)Approvedequivalenciesandalternativesshall

    only apply to the specific building, facility or structure involved in extraordinary case where no technical

  • 7/27/2019 fireprotectionfirepreventionfirecontrolregulations2010edition

    7/167

    - 3 - - 3 -

    alternativesexist;andshallnotconstituteblanketapprovalforsimilarcases.

    16.AbsenceofCriteria: (a)Whena specificapplication isnotcoveredby thecriteriaor theprovisionsofNFPA

    codes, standards & publications; other international building codes, recognized industry standards and

    standardengineeringpracticesshallbefollowedwithpriorandexpressapprovalofEHSFireDepartment/AHJ.

    (b)WhereappropriatetheprovisionofSection 15(Equivalencies)shallapply.

    17.Waivers: (a)Written request forwaiver to any established prescriptive criteria ofNFPA and its companioncodes,standardsandpublicationsorprovisionsoftheseregulationsshallbesubmittedtoEHSFireDept/AHJ

    fordeterminationprior to commencementofbuilding constructions. The same shalldemonstrate that the

    provisions,criteriaorrequirementscannotbetechnicallyexecuted,ortheirexecutionwillincreaseahazardor

    createanewhazardandnotechnicalalternativesexist. Writtenrequestforwaiversshallincludejustification,

    hazard analysis, alternatives considered and other pertinent data (b) Lack of funds and time deadlines of

    projectsshallnotbeconsideredsufficientjustificationfordeviationfromtheestablishedcriteria,requirements

    orprovisions&(c)Waivers,ifgivenexpresslybyEHSFireDept/AHJ,shallonlyapplytothespecificbuilding,

    structure,facilityorprojectinvolvedandshallnotconstituteblanketapprovalforsimilarcases.

    18.Insurance:Thestakeholdersarerequiredtohavetheir landsandpremises insuredagainstFire,ExplosionandPerils.

    19.Existing buildings, facilities or structures: (a) Existing buildings, facilities or structures that meet therequirementsofNFPA101 forexistingoccupanciesdonothavetobemodified tocomplywithprovisionsof

    these regulations, (b) Buildings, facilitiesor structures thatdonotmeet the requirementsofNFPA 101 forexisting facilitiesshallbebroughtup to,at least, theminimumrequirements, includingsprinklerretrofit, for

    existing occupancies, (c) If the facility cannot be brought up to the minimum requirements for existing

    occupanciesandarenovation,modernizationorrehabilitationproject isrequired,thatprojectshallmeetthe

    requirements fornew construction as stipulated in these regulations.& (d) any changes inoccupancy shall

    requirethebuilding,facilityorstructuretomeettherequirementsfornewconstructionforthenewoccupancy

    asstipulatedintheseregulations.

    20.SustainmentandRestoration:(a)Newworkaccomplishedinexistingbuildings,facilitiesorstructuresaspartof

    repair, restoration and sustainment actions /projects shallmeet the requirements fornew constructionas

    stipulated intheseregulations. Sustainmentandrestorationeffortsshall lookbeyondthescopeofworkto

    ensurethatthefireprotection,including lifesafety,featuresarenotbeingcompromisedordesignedonlyfor

    theportion

    of

    the

    building,

    facilities

    or

    structure

    that

    is

    being

    repaired

    &

    (b)

    The

    repair

    project,

    ifpossible,

    shall

    include a basis to support the entire building, facility or structure i.e. if considering providing a fire alarm

    extenderpanel to theexistingantiquated firealarmcontrolpanel,ensure thepanelbeingprovidedhas the

    capabilitytosupporttheentirebuildingfacilityorstructuresothatanyadditionalprojectscanutilizethenew

    panelwithouthavingtoremovewhatwasjustinstalled.

    21.Conversionofuse/changeofoccupancy:(a)Whenanyportionofabuilding,facilityorstructure ismodifiedfrom its current use to thatof an inhabited building, facility, structure forone year ormore, the building,

    facility or structure shall meet the requirements for new construction as stipulated in these regulations.

    Exampleswould include a warehouse (uninhabited) being converted to administrative (inhabited) use; an

    inhabitedadministrativebuildingbeingconvertedto uninhabitedbuilding, facilityorstructure;or inhabited

    building,facilityorstructurebeingaltered,modernized,modified,rehabilitatedorrenovatedandconvertedto

    uninhabitedbuilding,

    facility

    or

    structure

    or

    vice

    versa

    &

    (b)

    When

    any

    portion

    of

    abuilding,

    facility

    or

    structure

    ismodified from its currentuse toanyotheroccupancyuse for two yearsormore, thebuilding, facilityor

    structureshallmeettherequirementsofnewconstructionasstipulatedintheseregulations. Changinggroups

    of occupantswithin the occupancy classification does not constitute an occupancy change. An example of

    modifying from one occupancy to another would include an office building converted tomercantile. An

    exampleofchanginggroupsofoccupantswouldincludeaninstallationpersonnelfunctionoccupyingtheoffice

    spaceformallyusedbyaninstallationcontractingfunction.

    22.DurationofvalidityofFireDeptNOCforbuildingpermit: Iftheconstructionworkdoesnotcommencewithinsixmonthsof issueofNOC forbuildingpermit,a freshNOC is required tobeobtained;and theconcerned

    stakeholdersshallbeobligatedtocomplywithnewrequirements, ifany,asmayberequiredbythecurrent

  • 7/27/2019 fireprotectionfirepreventionfirecontrolregulations2010edition

    8/167

    - 4 - - 4 -

    changesincodes/regulations.Suchnewrequirementsshallbeincorporated/stipulatedinthefreshNOC.

    23.Offences: Appendix 53 contains the list of offences againstwhich appropriate financial penalties shall be

    imposed.

    24.Accreditation: Accreditationoftheconsultants,contractors,designteammembersand installersofactive&passivefireprotectionsystems,equipment,materialsorproductsthroughcompetentthirdpartyismandatory.

    25.Fakeandcounterfeitmaterials/products/equipment

    (a) Theconsultantsandcontractors shallbesubject to the lawsofUAE& relevantTrakhees regulations for

    supplyandinstallation ofthematerials/products/equipmentandcomponentsorpartsthereofthatare

    not genuine, original or not suitable for the intended purpose. This includes but not limited to the

    materials/ products/equipment that are defective, suspect or fake/counterfeit,

    materials/products/equipmentthathavebeenprovidedunderfalsepretensesandmaterials/products/

    equipmentthataremateriallyaltered,damaged,deteriorated&degraded.

    (b) Fire Dept reserves the right to rejectmultiple /cross listed and private labeledmaterials / products /equipment.

    26.Precedence:Theseregulationsshalltakeprecedenceoveranyconflictingsituation.

    27.If any section, subsection, sentence, clause of phrase of these regulations is, for any reasons, held to beunenforceableforanyreasonwhatsoever,itshallnotaffecttheremainingportionsoftheseregulations.

    GuidelineNotes:

    ChangeManagement

    Efficiency,effectivenessorsatisfactoryperformancesofanyfireprotectionsystemorequipmentondemand

    primarilydependuponadherencetotheirdesigncriteriaandtimelymaintenancethroughoutthelifecycleof

    building/facility. This life cyclemay involve changes in individual stakeholders including owners, tenants,

    management, maintenance staff and designed facility configuration and occupancy. It is, therefore,

    imperative that these changes bemanaged through recognition and adherence to (i) established change

    managementpolicies&proceduresand(ii)buildingfacilitymaintenancemanualsandestablishedprocedures

    fortheapprovalanddocumentationofbuilding/facilityusageandconfirmationattention.

    Operation

    &

    Maintenance

    manual

    (O

    &

    M)

    Thefireprotectionoperations&maintenancemanualclearlystatingtherequirementsofthebuilding/facility

    operatortoensurethatall installedfireprotectionsystems&theircomponentsandfirefightingequipment

    are inplaceandoperatingproperly /efficientlyatall times.TheO&M shallalsocontainappropriate fire

    prevention checklist,method of implementing such fire preventionmeasures (Refer to Part 7 of these

    regulations)andbuildingevacuationplan.

    Part2Sections1to5

    (ConsultancyServicesincludingthatofFireProtectionExperts/Specialistsand

    SubmittalRequirementsForObtainingBuildingPermit,CompletionCertificateand

    approvals

    related

    thereto

    and

    shop

    drawing

    approvals

    &

    fit

    out

    works

    requirements)

    1. Thequalified,competent&authorized/approvedconsultantsshallsubmitthedocumentsanddrawingsasperAppendix2. (RefertoCivilEngineeringDeptofTrakhees/PCFCforadditionalinformation/thecurrentlistof

    suchconsultants).

    2. TheConsultants(serviceproviders)executingprojectsinvolvingfireprotectiondesign,fireratedconstruction,

    firedetection,firesuppressionor lifesafetysystemsincludingevacuationplansshallberequiredtoprovide/

    hire the services and review of a qualified fire protection expert/specialist. Such fire protection

    expert/specialist shall be an integral part of the design team and shall be involved in every aspect of fire

    protectiondesign. Thisshallinclude,butnotlimitedto,buildingcodeanalysis,lifesafetycodeanalysis,design

  • 7/27/2019 fireprotectionfirepreventionfirecontrolregulations2010edition

    9/167

    - 5 - - 5 -

    of automaticdetection and suppression systems,water supply analysis andamultidiscipline reviewof the

    entireproject.

    3. Aqualifiedfireprotectionexpert/specialistshallbefullyconversantwithallprovisionsoftheseregulationsandalsomeetoneofthefollowingconditions:

    Fireprotectionexpert/specialistwithinthemeaning&contextoftheprovisionsoftheseregulationsshallbe

    anengineerhavingaBachelorofScience,AdvancedDiplomaorMasterofScienceDegree inFireProtection

    Engineering fromanaccrediteduniversityengineeringprogramor recognized FireEngineering Institutionof

    repute plus aminimum of 15 years ofwork experience dedicated to fire protection engineering including

    applicationofNFPAanditscompanioncodesandstandardsthatcanbeverifiedwithdocumentation.

    OR

    Aregisteredprofessionalengineer(P.E) inarelatedengineeringdisciplinewhohaspassedthe fireprotection

    engineering written examination administered by an accredited university or recognized Fire Engineering

    Institutionsofreputeplusminimumof10yearsofworkexperiencededicatedto fireprotectionengineering

    includingapplicationofNFPAanditscompanioncodesandstandards thatcanbeverifiedwithdocumentation.

    4. EHSFireDept/AHJreservestherighttoapprovefireprotectionexperts/specialists.

    5. Aqualifiedfireprotectionexpert/specialistshallhaveanunderstandingoforanabilitytointerpretthelevelof

    safetyintendedbythecodesorstandardsrelevanttotheprojectandtheabilitytodemonstrateanddocument

    theachievement

    of

    acceptable

    levels

    of

    protection.

    He/she

    shall

    have

    sufficient

    relevant

    knowledge

    to

    know

    whichapproachescouldbeusedtoperformthetasksandtheapplicabilityand limitationsofthemethods(s)

    thatcanbe selected. Examplesofareas that fireprotectiondesignprofessionalsoftenneed tounderstand

    includethefollowing:

    FireDynamics

    FireModeling

    ActiveandPassiveFireProtectionSystems

    FireTesting

    FireDeptoperations

    HumanBehavior

    GuidelineNotes:

    i. The consultants shallbe solely subject to the lawsof theUAE for lossesordamages in termsof lifeandproperty stemming from design errors, implementation errors, deficiencies of inspections, failure to

    construct in compliancewith the required standards, failure to complywith rules of Professional ethics,

    failure touse knowledge and experience to the contracting entity, and similar reasons; and successively

    (severally)liablewiththecontractorswheretheconsultantshaveundertakendesigncontrolandinspection

    servicesonworks. The consultants shallbe caused to complete and compensate forany such lossesor

    damagespursuanttothelawsoftheUAE.

    ii. EHSFire

    Dept/AHJ,

    EHS

    Dept

    or

    any

    other

    departments

    of

    Trakhees

    /PCFC

    and

    their

    directors,

    officers

    &

    otherconcernedpersonnel shallnotbeheld responsibleor liable foranysuch lossesordamages,errors,

    deficienciesandfailuresonthepartoftheconsultants.

    Part3Sections1to4

    (RiskAssessmentStudyandFireRiskAssessmentRequirements)

    1. RiskAssessmentstudyshallbemandatorynormally formanufacturing&process industries,storeplaces for

    flammable,combustibleandotherhazardousliquids,solids&gases,TankFarms,Spheres,Bullets,Liquid&gas

    storagetanks,boilers&pressurevessels,gasdistributionsystems,Petrol,Oil&Chemicaldistributionsystems/

    pipelinesandotherspecialstructures.

  • 7/27/2019 fireprotectionfirepreventionfirecontrolregulations2010edition

    10/167

    - 6 - - 6 -

    2. RiskAssessmentstudyshallbecarriedoutandreporttothateffectshallbesubmittedtoEHSDeptandEHS

    FireDeptbythequalified,competent&authorized/approvedconsultants(RefertoEHSDeptorEHSFireDept

    forthecurrentlistofsuchconsultants).

    3. EHSapprovedRiskAssessmentconsultantsshall include,butnot limitedto,the followingpoints intheirRiskAssessment/AnalysisReport:

    a) Firehazardidentification.

    b) Severityanalysis/Fire

    &

    Explosion

    Index

    (F

    &

    EI)

    and

    Toxicity

    Index

    (TI).

    (RefertoAppendix3)

    c) Mappingareasofrisk,riskcontoursandrisktransect

    d) Directcomparisonwithactuarialdataandotherriskcriteria.

    e) Criteriaforassessingmaximumreleasequantityandseparationdistances/quantifyingdispersion.

    f) Scenariodevelopment.

    g) Probabilityanalysis/thechancesoffireandexplosion.

    h) Riskmonitoring(iftheriskisacceptable).

    i) Identificationofenvironmentalproblemsthatarerelatedtofireprotection.

    j) Riskreductionanalysis(iftheriskisnotacceptable)systems&methodsandrecommendationstopreventand/orreducethemtotheacceptablelevel(s).

    k) Hazard

    and

    Operability

    Study

    (HAZOP)

    l) Eventtrees

    m) Casehistorieswhereappropriate

    n) Compliancewithcodes,proceduresandregulations includingmanufacturingrequirement&management

    underASMEcodeforboilers&pressurevessels.

    o) Toxicityrelationships&densegasdispersionmodel

    p) Damagefromfireandradiantheat

    q) TheTNTequivalence

    r) Primaryandsecondaryblastsrelationships

    s) Topeventfrequencyestimation

    t) Design

    &

    construction

    procedures

    u) MaintenanceOperations

    v) Education&Trainingofstaff

    w) Emergency/EvacuationPlans (onsite&offsiteplans includingemergencyactions,emergencyreportingprocedures, evacuation policy, exitmaps, procedure for sheltering in place, procedure for peoplewho

    remain in place, procedure for accounting for all personnel, Rescue andmedical tasks and emergency

    communicationplan.)

    4. FireRiskAssessment(FRA):NFPA551shallbecompliedwithforevaluationofFireRiskAssessment. NFPA551

    mainlyaddressesthefollowing:

    a) Applyingriskinformeddecisionmakingforfiresafety

    b) Selectingfire

    scenarios,

    identifying

    representative

    challenging

    scenarios

    and

    grouping

    such

    scenarios

    into

    clustersforthepurposesofconductingmoreeffectiveconsequenceanalysis

    c) Documentationthatshouldaccompanyafireriskassessment

    d) Capabilitiesofthoseconductingafireriskassessment

    Guidelinenotes:

    i Thescalethatmeasuresseveritysuchasdeath,injuries,propertydamage,andareasreachedbyflamesshallbespecified.

    ii Calculationsspecifyingtheseveritymeasureusedforaparticularfireshallbeincluded.

    iii Activeandpassivefireprotectionmeasuresshallbeincluded.

  • 7/27/2019 fireprotectionfirepreventionfirecontrolregulations2010edition

    11/167

    - 7 - - 7 -

    iv The consultants shallbe solely subject to the lawsof theUAE for lossesordamages in termsof life and

    property stemming from design errors, implementation errors, deficiencies of inspections, failure to

    construct in compliancewith the required standards, failure to complywith rules of Professional ethics,

    failure to use knowledge and experience to the contracting entity, and similar reasons; and successively

    (severally)liablewiththecontractorswheretheconsultantshaveundertakencontrolandinspectionservices

    onworks. Theconsultants shallbecaused tocompleteand compensate forany such lossesordamages

    pursuanttothelawsoftheUAE.

    v EHSFireDept/AHJ,EHSDeptoranyotherdepartmentsofTrakhees/PCFCandtheirdirectors,officersand

    otherconcernedpersonnel shallnotbeheld responsibleor liable forany such lossesordamages,errors,

    deficienciesand

    failures

    on

    the

    part

    of

    the

    consultants.

    Part(4)Sections1to16)

    (BuildingFireProtectionDesignFeaturesandLifeSafetyRequirements)

    1. FireProtectionDesignAnalysis:

    Afireprotectiondesignanalysisisrequiredforalldesignsandshalladdressthefireprotectionrequirementsof

    theprojectasrequiredbytheseregulations. Thefireprotectiondesignanalysisshallbeseparatefromother

    disciplinesandshallbesubmittedwithconceptsubmission. Thesameshallincludethefollowing:

    a)Building code analysis i.e. type of construction, height and area limitations and building separation orexposureprotection.

    b)Classificationof

    occupancy.

    c)Requirement for fire rated walls, fire rated doors, fire dampers with their fire resistive ratings, smokecompartmentation&smokebarriers.

    d)MeansofegressinaccordancewithNFPA101(occupantloads,exitcapacitiesetc).

    e)Analysis of automatic sprinkler systems and other suppression systems and protected areas, including

    hydraulicanalysisofrequiredwaterdemand.

    f)Watersupplies,waterdistribution,locationoffirehydrants.g)Smokecontrolmethodsandsmokecontrolsystems.

    h)FireAlarmSystem(thetypeofalarmsystemandlocationofalarmequipment).

    i) Firedetectionsystem(thetypeofdetectionsystemandlocationofdetectors).j) Standpipesystemsandfireextinguishers.

    k)Interiorfinishratings.

    l) Connectionto

    and

    description

    of

    fire

    alarm

    supervising

    system.

    m) Identifythevariousoccupanciesandhazardousareasassociatedwiththefacility.

    n)FireDeptaccess.

    o)Coordinationwithsecurityrequirements.

    2. ClassificationofOccupancyandHazardsofContentsandSpecialOperation:

    RelevantprovisionsofNFPA101andNFPA5000 shallapply. QualifiedFireProtectionexpert/specialistshall

    submitareportonfireprotectionandlifesafetyfeatureswhenmakingbuildingpermitsubmissionforprojects.

    (RefertoAppendix 4)

    3. TypesofConstruction:

    Newstructures

    shall

    be

    constructed

    from

    non

    combustible

    or

    the

    resistive

    construction

    as

    per

    NFPA

    5000.

    4. Heightandarealimits:

    Heightandarea limitationsofnewbuildingsshallbe inaccordancewithNFPA5000whereexistingbuildings

    undergoadditions,thecombinedareaoftheexistingbuildingandthenewadditionshallcomplywiththelimits

    establishedinNFPA5000wheretheareaoftheadditionwouldcausethebuildingtoexceedtheheightand/or

    arealimitsofNFPA5000,firewallsand/orfirebarriersarerequiredasdeterminedbyNFPA5000.

    5. SiteConsiderations:

  • 7/27/2019 fireprotectionfirepreventionfirecontrolregulations2010edition

    12/167

    - 8 - - 8 -

    a) RefertoAppendix6FireDepartmentVehicleAccess. Atminimum,oneofthelongsidesofeverybuilding

    shallbeaccessibletoFireDeptvehicles.

    b) Buildingseparationandrequirementsforratedexteriorwallsandopeningsforprotectionfromexposures

    byadjacentbuildingsorhazardsshallcomplywithNFPA5000.

    6. SpecialStructures&HighRiseBuildings:

    RelevantProvisionsofNFPA101andNFPA5000shallapply. Towers,highrisebuildings;watercoolingtowers;

    television,microwaveandradiotransmittingtowers;windowlessandundergroundbuildings;tunnels;highway

    andrailroadbridges; tents;grandstands;amusementparkstructures;membranestructures;piersandwater

    surroundedstructures

    used

    for

    purposes

    other

    than

    vessel

    mooring

    or

    cargo

    handling;

    air

    right

    structures;

    coveredmallbuildingsandother special structures suchas signsandopenparkinggaragesareexamplesof

    specialstructures.

    Guidelinenotes:

    Fordesigninghighrisebuildings,thefollowingmajorfireprotectionfactorsshallbeconsidered:

    i. Accessibility

    ii. Uniquepeoplemovement&egresssystems

    iii. Increasedoccupant,equipment,materialandfuelload(s)

    iv. Combinationofoccupanciesinasinglehighrisebuilding

    v. Naturalforcesi.e.wind/stackeffectaffectingfireandsmokemovement.

    RefertoAppendix5forFireProtection/FireSafetyGuidelinesforDesigningHighRiseBuildings

    7. OccupanciesinSpecialStructures:

    Relevant provisions of NFPA 5000 shall apply for all occupancies in special structure viz. underground

    structures, limitedaccessstructures,vehiclesandvessels(mobileunits),openstructures (outdoorprocessing

    facilities),towers,watersurroundedstructures,piers&helistops.

    8. SpecialConstruction:

    RelevantprovisionsofNFPA5000shallapplyforallspecialconstructionviz.bleachers,foldingandtelescopic

    seating, grandstand, hot tub, membrane public pool, residential pool, swimming pool, spa, air inflated

    structure,

    air

    supported

    structure,

    membrane

    structure,

    tensioned

    membrane

    structure,

    permanent

    &

    temporarystructures,tent,privatepartytentandweatheredmembranematerial.

    9. EncroachmentsintothePublicRightofway:

    RelevantprovisionsofNFPA5000shallapply forprojection intoAlleys,spacebelow sidewalk,Balconiesand

    Appendages,Doors,RoofDrainage,Airtightstructures&SkywalkBridges.

    10.RoadTunnels,BridgesandotherLimitedAccessHighways:

    RelevantprovisionsofNFPA5000shallapply.

    11.PassiveFireProtection FeaturesofFireProtectionandFireResistiveMaterialsandConstruction:

    a)Everybuilding,

    facility

    or

    structure

    shall

    be

    constructed,

    arranged,

    equipped,

    maintained,

    and

    operated

    to

    avoidunduedangertotheoccupantsfromfire,smoke,fumes,unsafeconditionsorresultingpanics.

    b)RelevantprovisionsofNFPA101,NFPA5000andNFPA220shallapply.

    Guidelinenotes:

    i Balancepassiveandactivefireprotectionmeasurestoreinforceandcomplimenteachother.

    ii Implement key decisions related to passive fire protection made during design, construction andoccupancy.

    iii Useoffireresistivebarrierstoslowspreadoffiretolargesecondaryitems.

    iv Useconstructionbarriers toblock firespreadbetweenzones (wallassemblies,ceiling/floorassemblies,

  • 7/27/2019 fireprotectionfirepreventionfirecontrolregulations2010edition

    13/167

    - 9 - - 9 -

    barriersbetweenoccupiedandconcealedplaces,firestopping inconcealedspacesandexteriorbarriers

    toverticalspreadbetweenfloors).

    v Design doors and windows to block fire spread between zones (Fire door assemblies and window

    restrictionstoblockfirespreadbetweenbuildings/structures/plants).

    vi Separatebuildings,facilitiesorstructuresenoughtopreventfirespreadbetweenthem.

    vii Regulate design and operation of systems for heating, venting, and air conditioning to prevent theirservingasmechanismtotransfersmokeandgases intouncontaminatedoccupiedareas.(Thisshallalso

    permitshutoffofairmovementinfires).

    viii Plugverticalandhorizontalutilityopenings(pipes,cableducts,ACductsandcables)andpeepthrough(at

    doors,columns&beams)bysuitablefireresistivesealant.

    ix Considercompartmentationtocontainspreadoffire/smoke/heat.

    x Fireretardanttreated(FRT)plywood: FRTplywoodshallnotbeused inanypartoftherooforroofing

    systems. Existing FRT plywood installations shall be regularly inspected for structural integrity.

    ReplacementofdamagedFRTplywoodmayrequireadditionalfireprotectionmeasuresifFRTplywoodis

    tobereplacedwithmorecombustiblematerials.

    xi Insulation: Thermal and acoustical insulationwith a flame spread (FS) ratingnothigher than75 and

    smokedeveloped(SD)ratingnothigherthan150whentestedinaccordancewithASTME84(NFPA255)

    shallbeused. Applicationofcellularplasticinsulationtobuildingexteriorsshallbeinaccordancewiththe

    requirementsoftherelevantcode/standard. Cellularplasticshallnotbeusedforinteriorinsulation.

    xii Roofcoveringsandroofdecks: Roofcoveringsapprovedand listedbyanNRTLshallbeused. TheUL

    RoofingMaterials

    and

    Systems

    Directory

    lists

    three

    classes

    (A,

    B

    and

    C)

    of

    acceptable

    roof

    coverings

    based

    oncompliancewithUL790andNFPA256. RoofdeckassembliesshallbeUL listedasFireclassifiesor

    equal listing or classification by an NRTL or FM approved except for fully sprinklered buildings and

    buildingslessthan744m2.

    xiii Wood: Woodusedforwalls,platforms,blocking,furringandsimilarapplicationsshallbefireretardant,

    pressureimpregnated. Fireretardantcoatingsofintumescentpaintorotherfireretardantchemicalsare

    notacceptableinlieuoffireretardanttreatment.

    xiv Fire and Smoke Barriers: Fire and smoke barriers shall comply with the requirements of NFPA 101.RelevantprovisionsofNFPA90AshallapplyfortreatmentofHVACductpenetrations,locationsofsmoke

    dampersand smokedetector requirements. Subject to theapprovalofEHSFireDept smokedampers

    maybeomitted inHVACductsthatpenetratesmokebarrierswherethesystem isdesignedtoperform

    any

    of

    the

    following

    functions:

    Function as an engineered smokecontrol system, including the provision of continuous air

    movementwithairhandlingsystem.

    Provideairtootherareasofthebuildingduringafireemergency.

    Providepressuredifferentialsduringafireemergency.

    12. InteriorFinish,includingfloorfinish,Contents&Furnishings:

    a) RelevantprovisionsofNFPA101andNFPA5000shallapply.

    b) Restrictmaterialsused incontentsand furnishings to reduceheat release rateand smokegenerationrate&topreventunusualtoxichazardrelativetoquantityofsmokegenerated.

    c) Addfireretardantstomaterialstoslowgrowthofheatreleaserate.

    d) Restricttotal

    fuel

    load

    to

    limit

    contents

    based

    in

    total

    fuel

    potential.

    e) Restrict liningsof rooms toprevent rapid flame spread (Restrictwallcoverings,ceilingcoverings,and

    floorcoverings).

    f) Restrictmaterialsinconcealedspaces(Restrictconcealedcombustiblesandconcealedspacelinings).

    g) Dropoutceilings(foamgridpanels)shallnotbeused.

    13. LiftsFireLifts/ElevatorsandConveyingSystems:

    a) New lifts shall be designed in accordancewithASMEA 17.1which includesprovisions for a fire lift.RelevantprovisionsofNFPA101andNFPA5000shallapply.

  • 7/27/2019 fireprotectionfirepreventionfirecontrolregulations2010edition

    14/167

    - 10 - - 10 -

    b) Allthefloorsshallbeaccessiblefor24hoursbythelifts.Theliftsprovided inthebuildingsshallnotbe

    consideredasameansofescapeincaseofemergency.

    c) Theliftmachineroomshallbeseparatedandnoothermachineryshallbeinstalledtherein.

    d) Liftsdesigned in accordancewithDubaiMunicipality standards shall alsobeapproved subject to theconditionthatthefollowingrequirementsarestrictlymet:

    i) Theelevatorshafttobeofthe2Hourfireresistantconstruction.ii) Elevatortobefittedwithprotectedandstandbypowersupplies.

    iii) Smokeventingprovisionshallbeprovidedtotheseliftshafts.iv) Elevatorsshallreturntothelevelofexitdischargeincaseofemergency,andinthecaseofthe

    emergencybeingontheLED,aalternativefloorshallbeusedasdefinedbytheFireSafetyStrategy

    14. BuildingsServiceandFireProtectioninstallations/fireextinguishingSystemsandEquipment:

    a) Design of new, andmodifications to existing buildings and facilities shall be in accordancewith the

    requirementsof these regulationswhichdescribe specific fireprotectiondesign criteria. Design is to

    incorporateredundantfireprotectionconcepts,employingactivefireprotectionthroughautomaticfire

    suppression and detection systems, passive fire barrier features, and limiting combustible fuel load

    withinthebuildingsinordertocontrolandminimizepotentiallosses.

    Completeautomatic firesuppressionsystemsare tobeprovidedand installed inaccordancewiththe

    applicable NFPAcodes/standards forallprojects (regardlessof fundingsources)where themaximum

    credible fire loss (MCFL)withoutautomatic fire suppressionwould result in the lossofuseofa vital

    structureor

    equipment.

    Inaddition to theabove requirement, fireextinguishingsystemsshallbeprovidedwhere requiredby

    applicableNFPAcodes/standards.

    When the criteria above does not apply, automatic fire suppression and/or detection may still be

    warrantedbasedonanyofthefollowingfactors:

    (i) Programmaticimportance(ii) Effectsonoperations(iii)Costvs.benefit

    (iv)Exposure

    (v) Futureconditions

    b) FixedFireFighting Installations/FireExtinguishingSystems:Thefixedfirefighting installations/systems,sorequired,shallmostlyinclude[butnotlimitedto]thefollowing:

    (i) HoseReel.

    (ii) SprinklerincludingEarlySuppressionFastResponse(ESFR)sprinklerssystem

    (iii) WaterSpraySystem

    (iv) AutomaticSmoke/Heat/Flame/LowExplosiveLimit(LEL)Detectors.(v) Smokeandheatventilationsystem.(vi) Delugefoamorwatersprinkler&foamorwaterspraysystems.

    (vii) ClosedHeadfoamwatersprinklersystem.

    (viii)Totalfloodingsystems(ofappropriateextinguishingagent(s).)

    (ix) FoamPourerSystem.

    (x) Foam/Watermonitors.(xi) HydrantsandHoseBoxes.(xii) FirePumps&(xiii) FireWaterTanks.(xiv)PrivateFireServiceMains

    (xv) CleanAgentFireExtinguishingSystems

    c) FireDetection&FireAlarmSystems:Everybuilding,facilityorstructureshallbeprovidedwithsuitablefiredetection/alarmsystemscapableofenablingearlydetectionoffireandwarningoccupantsofthe

    existenceoffire.

  • 7/27/2019 fireprotectionfirepreventionfirecontrolregulations2010edition

    15/167

    - 11 - - 11 -

    When fire protection systems are installed in buildings/facilities they are to be compatiblewith and

    connectedto(whereavailable),thesitewidefirealarmmonitoringsystem.

    Firealarm installationsshallcomplywiththe requirementsandrecommendationsofNFPA72,project

    specifications, and EHSFire Dept and Dubai Civil Defence requirements (24 X 7 CentralMonitoring

    System).

    AllnewfirealarmsystemsshallbeaddressableunlessotherwisepermittedbyEHSFireDept.

    (i)Specialrequirements

    Wheremultiple firealarm controlpanelsareprovided they shallbe interconnected inaClassA

    (Style6or

    7)

    network

    arrangement.

    Allfirealarmsystemsshallbemonitoredbyasupervisingstation.

    All firealarmcircuitsshallbe installed inconduit (EMT, IMT,or rigid). Theuseof firealarmMC

    cablemaybepermitted,subjecttotheapprovalofEHSFireDept

    SignalingLine,notificationappliance,andpowercircuitsshalleachbeinseparateconduit.(Referto

    Appendices36&37andreferAppendix49forchecklists)

    (ii) PublicAddress

    Separate public address systems shall be provided for nonemergency communication where

    desired/needed. Fire alarm systems shall not be used to address the public in nonemergency

    situations.

    d) Portable Fire Extinguishers: Every building, facility or structure shall be provided with portable fire

    extinguishers

    of

    types,

    capacities,

    numbers,

    and

    locations

    appropriate

    to

    the

    individual

    building

    or

    structurewithdueregardtothecharacterof itsoccupancy.Allthe fireextinguishersshallconformto

    thestandardscurrentlyapprovedbyUAE/CivilDefenseauthorities.

    e) SprinklerSystems

    (i) FireSprinklerSystemdesigncriteriashallcomplywithNFPA13.

    (ii) Thefollowingminimumdesigncriteriashallbemet:

    Hydrauliccalculationsmustbeusedfordesign. Pipescheduledesignwillnotbeaccepted.

    Reductions in thehydraulicallymost remoteareaallowed inNFPA13with theuseofquick

    responsesprinklersarenotpermitted.

    Variation indischarge from individual sprinklerheads in thehydraulicallymost remote area

    shallbeaspertherespectivedensitycurves.

    Thecalculatedpipevelocityshallnotexceed20ft/sec(6.1m/sec).

    Safetymargin:Thetotaldemandwaterflowandpressuremustbeat least10% lessthanthe

    availablewaterflowandpressure.

    Pipeschedule:Schedule40orgreatershallbeused forallsprinklerpiping lessthan4 inches

    (100mm). Schedule10,40,orgreatershallbeusedforsprinklerpiping4inches(100mm)and

    larger.

    Butterflyvalvesmaybeusedonlyonpiping4inches(100mm)andless.

    GatevalvesshallbeOS&Ystyle.

    Useofrestrictiveorifices,reducingflanges,unions,andplainendfittingswillnotbepermitted.

    Branchoutletmechanicalfittingsandclamptypefittingsshallnotbepermitted.

    Compact shelving shall be protected with automatic sprinkler system meeting the

    requirementsofNFPA909

    f) StandpipeSystems

    i. When required, standpipe systems shall be installed in accordance with NFPA 14, Installation of

    StandpipeandHoseSystems.

    ii. Residualpressurerequirementsmaybeomittedforbuildingsunder150ft(45m)inheightwherefire

    department apparatus are expected to boost pressure in standpipe systems. Piping for standpipe

    systems shall be designed by hydraulic calculation to show that the fire department pumper,

    connectedtoafiredepartmentconnection,candelivertheneededflowandpressureatthetopmost

    hoseconnections.

  • 7/27/2019 fireprotectionfirepreventionfirecontrolregulations2010edition

    16/167

    - 12 - - 12 -

    iii. ClassIstandpipesystemsshallbeprovidedinexitstairwaysofbuildingsfourstoriesormoreinheight.

    Thesesystemsshallnot includehose.21/2by11/2(63.5by38mm)reducers,withcaps,shallbe

    providedatallfiredepartmentvalves.

    iv. ClassIstandpipesystemsshallalsobeprovided innonsprinkleredfacilitieswhereallportionsofthe

    buildingcannotbereachedwith200feetoffirefightinghoselinesextendedfromtheexteriorofthebuilding, regardless of building height. Locate FD hose connections such that all portions of the

    buildingcanbereachedwith100ft.(30.5m)ofhoseplus30ft.(9.14m)ofhosestream.

    v. CombinedClassIIandClassIIIstandpipesarenotpermitted.

    g) PrivateSystemsi. Privatewaterdistributionsystemsandwatersupplies shallbe installedinaccordancewithNFPA24

    NFPA20,NFPA22andAWWAM31

    ii. Supply Duration andMain Size Criteria: Thewater supply for fire protection shall haveminimum

    supplydurationof2hours. Newprimarydistributionmainsshallinnocasebesmallerthan12inches

    (300mm),building/facility loops shallbe8 inches (200mm)or larger,and fixed suppression feeds

    shall,innocase,besmallerthan6inches(150mm).

    iii. DistributionSystem:Fireprotectionwatersupplydistributionsystemsforallnewinstallationsshallbe

    loopedtoprovidetwowayflow,withsectionalvalvesarrangedtoprovidealternatewaterflowpaths

    toanypointinthesystem.

    iv. IndependentSources:

    Facilities

    having

    an

    MPFL

    in

    excess

    of

    AED

    200

    million

    shall

    have

    two

    independentsourcesoffireprotectionwater.

    v. Hydrants:FirehydrantsshallbeUL listed,FMapproved,or listedorclassifiedbyanNRTLand shallhave two 21/2inch (65mm) hose outlets and one 41/2inch (115mm) suction connectionwith

    national standard fire hose threads in accordance with NFPA 24 and NFPA 1963, Fire Hose

    Connections.

    Hydrantsshallbeabovegroundtype.

    Hydrantsshallbeinstalledadjacenttopavedareas,accessibletofiredepartmentapparatus/vehicles.

    Hydrantsshallnotbecloserthan3feet(1m)norfartherthan7ft(2.1m)fromtheroadwayshoulder

    orcurb line. Hydrantsshallbe installedwithnot lessthan6inch(65mm)connectiontothesupply

    main,andvalvedattheconnection. Barrelsshallbelongenoughtopermitatleast18inch(450mm)

    clearance

    between

    the

    center

    of

    the

    4

    1/2

    inch

    (115

    mm)

    suction

    connection

    and

    grade.

    The

    ground

    shallbegradedsothatanysurfacedrainageisawayfromthehydrant.

    InstallationshallbeinaccordancewithNFPA24. Suctionconnectionshouldbeperpendiculartothe

    streettoallowstraightlinedconnectiontothepumper.

    Asufficientnumberofhydrantsshallbeprovidedsothathosestreamdemandcanbemetwithout

    takingmorethan1,250gpm(4,740L/min)fromanysinglehydrant. Hydrantsmustalsobespacedin

    accordancewiththefollowingrequirements:

    Allpartsofthebuildingexteriorshallbewithin350ft(106m)ofahydrantwithconsideration

    given toaccessibility andobstructions. Hydrants shallbe locatedwith consideration given to

    emergencyvehicleaccess.

    Atleastonehydrantshallbelocatedwithin150ft(45m)ofthefiredepartmentconnection.

    Hydrantsprotectingstoragefacilitiesaretobespacedamaximumof300ft(91m)apart.

    Hydrantslocated

    adjacent

    to

    parking

    areas

    or

    other

    vehicle

    traffic

    areas,

    shall

    be

    protected

    by

    bollards. Thebollardsshallbelocatedsotheyarenotdirectlyinfrontofanoutlet.

    (RefertoAppendix33)

    Guidelinenotes:

    i.SmokeControl&HeatVentilationSystem: Smoke&Heatventsshallbeconsidered inbuildingswhereahighrateofheatreleaseisanticipatedduringafire. RelevantprovisionsofNFPA92A,NFPA92BandBSEN

    12101shallbeapplicablewhereappropriate.

  • 7/27/2019 fireprotectionfirepreventionfirecontrolregulations2010edition

    17/167

    - 13 - - 13 -

    ii.Waterdemandsforsprinkleredbuildings,facilitiesorstructures:Thewaterdemandrequiredforsprinkler

    protection shall take into considerationoccupancy,dischargedensity,design areaand typeof sprinkler

    system(wetordry),typeofconstructionandotherbuildingfeatures.

    iii.Waterdemands forhosestreams:Hosestreamsshallbeneededconcurrentlywithsprinklerdischarge in

    ordertoeffectfinalextinguishmentortowetdownadjacentareas/structures.

    iv.Totalwaterdemand forsprinkleredoccupancies:The totalwaterdemand forsprinkleredoccupancies isequaltothesumofthedomestic/industrialdemandplusthesprinklersystem(s)waterdemandandhose

    stream(s) demand. The total demand shall be available at the sprinkler system connection to the

    underground main and at the pressure necessary to produce the required sprinkler density over the

    requiredhydraulicallymostremoteareaofsprinkleroperation.

    Waterdemandforspecialfacilities,familyhousing,piledorrackstorage,rubbertirestorage,flammable&

    combustibleliquidstorageshallbedeterminedonthebasisofrelevantNFPAcodes.

    v.Water supplypressure requirements: Pressure required for sprinkleredbuildings, facilitiesor structuresshall be themost demanding pressure of the domestic / industrial demand, sprinkler demand or hose

    streamdemandandshallbedeterminedbyhydrauliccalculations.

    vi.Quantities of water required: Requirements for fire protection water storage shall be based on theassumptionthattherewillbeonlyonefireatatime. Thequantityofwaterrequiredshallbeequaltothe

    product of the fire protectionwater demand and the required duration. This quantity represents fire

    protectionrequirementsonlyandshallbeavailableatalltimes. Watersupplyfordomestic,industrialand

    other

    demands

    shall

    be

    added

    to

    these

    requirements

    to

    determine

    the

    total

    amount

    of

    water

    that

    is

    necessaryatthebuilding,facilityorstructure. Thewaterstorageshallbeselfreplenishing. Itshallreach

    required volume during normal consumption within 48 hours and within 24 hours curtailing normal

    consumption.

    vii. Thepumps:Pumpsshallhaveadequatecapacitywithreliablepowerandwatersupply.Theyshallconform

    totherequirementsofNFPA20.Firepumps,driversandotherequipmentincludingautomaticaccessories

    shall be listed byUL, approved by FM or listed or classified byNRTL. Fire pumps shall be located in a

    detached,noncombustiblepumphouseorlocatedina2hoursfireratedroomwithdirectaccessfromthe

    exterior. A secondary fire pump shall be providedwhen thewater supply cannot support 25% of the

    sprinklersinthehydraulicallymostremotedesignareawiththeprimaryfirepumpoutofservice.

    viii.FireMains: Useof firemains for the services like irrigation,process&domesticpurposes shallnotbe

    permitted.

    PressureRegulating Valves (PRVs): PRVs are restricted in use on fire protectionwater systems.Where

    essential,PRVsshallbeinstalledonindividualserviceratherthanonmainpiping.WherePRVsareprovided

    in distributionmains supplying systems or portions of systems with fire hydrants, automatic sprinkler

    systemsorother installed fireprotection, the following features shallbeprovided to safeguard against

    failuresandtofacilitatemaintenance:

    a) ControlvalvesoneachsideofthePRVs.

    b) BypassaroundPRVs.

    AlsorefertoAppendix31

    ix.FoamSystems:FoaminstallationsshallbeinaccordancewithNFPA11,NFPA11AandNFPA16.FormoreinformationrefertotheNFPAFireProtectionHandbookandFMGlobalDataSheets.

    x.DryChemical Extinguishing Systems:Dry chemical extinguishing systems shall conform toNFPA17.Dry

    chemicalagentsshallnotbeusedprotectsensitiveelectronics.Drychemicalextinguishingsystemsareno

    longerULlistedorFMapprovedfortheprotectionofcookingequipment.

    xi.CarbonDioxideSystems:CarbondioxidesystemsshallconformtoNFPA12.

    xii.WetChemicalsExtinguishingSystems:WetChemicalSystemsshallconformtoNPFA17A.

    xiii.CleanAgentFireExtinguishingSystems:Cleanagentfireextinguishingsystemsaresuitableforprotectionof

    certaintypesofspecialoccupancies,hazardsandfacilitiesandshallconformtoNFPA2001.Cleanagentfire

    extinguishingsystemsshallnotbeinstalledasasubstituteforrequiredautomaticsprinklersystems. Stand

    alonecontrolpanelsthatare listed forreleasingdeviceserviceandmonitoredby thebuilding firealarm

  • 7/27/2019 fireprotectionfirepreventionfirecontrolregulations2010edition

    18/167

    - 14 - - 14 -

    systemshallbeprovided. Carefulconsiderationshallbegiventocompartmentunder/overpressurization

    during the discharge of total flooding clean agent systems. Pressure relieving vents, located near the

    finished ceiling,maybenecessary to regulate rapidpressure changesduringdischarge. Manufacturers

    recommended procedures relative to enclosure venting shall be compliedwith. Amanually activated

    exhaustsystemtofacilitatetheextractionofanyremainingcleanagentaftertherequiredholdtimeofthe

    total flooding clean agent system shallbe provided. The exhaust system can be integrated intoHVAC

    systemfortheenclosure.

    xiv.CookingEquipmentSuppressionSystems:

    a) AllcommercialgreasehoodandductsshallmeettherequirementsofNFPA96andNFPA17A.

    b) Greaseductsshallbeprotectedbyapprovedproducts,designedwithclearancereductionmethodsandinstalledasfireratedenclosures.

    xv.WaterMistFireProtectionSystems:WatermistfireprotectionsystemsshallconformtoNFPA750.Water

    mistfireprotectionsystemsshallnotbeinstalledasasubstituteforrequiredautomaticsprinklersystems.

    xvi.EmergencyWarningSystemshallincludeboth:audibleandvisualalarms.

    xvii. SeismicCriteria:Fireprotection systems shallbedesignedand installed towithstand seismicevents in

    accordance with the applicable NFPA standards except as required by other criteria for safety class

    equipment.

    15. MeansofAccess/Accessibility:

    a) RelevantprovisionsofNFPA5000shallapply.

    b) Nobuilding, facilityor structure shall be erected so as todeprive anyotherbuilding of themeansofaccess.

    c) Theapproachroadtothebuildingandopenspacesonitsallsidesupto6mwidthandthelayoutforthe

    sameshallbedoneinconsultationwithEHSFireDepartmentandthesameshallbeofallweatherground

    accesshard surface capable of taking theweight of the heaviest fire vehicle availablewith FireDept.

    /DubaiCivilDefence.

    d) Mainentrancestothepremisesshallbeofadequatewidthtoalloweasyaccesstothefirevehiclesandin

    nocaseitshallmeasurelessthan5meters.Theentrancegateshallfoldbackagainstthecompoundwall

    ofthepremises,thusleavingtheexterioraccesswaywithintheplotfreeformovementoftheFire/Civil

    DefenceVehicles.Ifarchwayisprovidedoverthemainentrance,theheightofthearchwayshallnotbeat

    aheight

    less

    that

    4m.

    e) Anylockingdevicecontrollingvehicleaccessshallbeundercontrolof24hoursecuritypersonnellocatedatthespecificfacility.

    f) Buildings,facilitiesorstructureswithfiredepartmentconnectionsforsprinklerorstandpipesystemsshallbeprovidedwithsuitableallweathergroundaccesssurfaceforpumperapparatuswithin45mofsuchfire

    departmentconnections.

    g) TheprovisionsofPart5Section5oftheseregulationsshallbecompliedwith.

    h) RefertoAppendix6fortherequirementsconcerningFireDepartmentVehicleAccess.

    16. MeansofEgress:

    a) Everybuilding,

    facility

    or

    structure

    shall

    be

    provided

    with

    safest

    means

    of

    egress

    and

    other

    safeguards

    of

    kinds, numbers, locations and capacities appropriate to the individual building or structurewith due

    regard to type of occupancy, the capabilities of the occupants, number of persons exposed, the fire

    protectionavailable,thetypeofconstructionofthebuildingorstructureandotherfactorsnecessaryto

    providealloccupantswithareasonabledegreeofsafety. Therequisitenumberandsizeofvariousexits

    shall be providedbased on thepopulation in each room, area and floorbased on theoccupant load,

    capacityofexits,traveldistanceandheightofbuildings. (RefertoAppendix7)

    b) Adequatemeansofegressshallbeprovidedineverybuilding,facilityorstructure,wherethesize,areaofoccupancyandotherarrangements[thatarelikelytoendangertheoccupantsattemptingtouseasingle

    meansofegress]areblockedbyfireorsmoke.Allsuchmeansofegressshallbesoarrangedtominimize

  • 7/27/2019 fireprotectionfirepreventionfirecontrolregulations2010edition

    19/167

    - 15 - - 15 -

    thepossibilityoftheirsbeingrenderedimpassablebythesameemergencyconditions.

    c) Everyexitstairwayandotherverticalopeningsbetweenfloorsofabuilding,facilityorstructureshallbesuitably enclosed or protected as necessary to afford reasonable safety to occupantswhile using the

    meansofegressandtopreventthespreadof fire,smokeor fumesthroughtheverticalopenings from

    floortofloorbeforetheoccupantshavereachedthenearestexit.

    d) Exitsshallbesoarrangedthattheymaybereachedwithoutpassingthroughanotheroccupiedunitexceptincaseofresidentialbuildings.

    e) MeansofegresscomponentshallcomplywithNFPA101andNFPA5000.

    f) Thepopulation

    in

    rooms,

    areas

    of

    floors

    shall

    be

    calculated

    based

    on

    the

    occupant

    load

    factors

    given

    in

    theAppendix8totheseregulations.

    g) Common path, DeadEnd and Travel Distance limits etc. shall comply with Appendix9 to these

    regulations.

    h) IlluminationofmeansofEgress shallbeprovided inaccordancewithNFPA101 foreverybuildingand

    structurewhererequired.

    i) Emergency lighting facilities formeansofegressshallbeprovided inaccordancewithNFPA101forthebuildingsandstructureswhererequired.

    j) WalkingsurfacesinmeansofegressshallcomplywithNFPA5000.

    k) EveryrampusedasacomponentinmeansofegressshallconformtothegeneralrequirementsofNFPA

    5000.

    l) AreasofrefugeshallconformtoNFPA5000.

    m) SlidEscapesshallbepermittedasacomponentinameansofegresswherepermittedinNFPA5000.

    n) Locks, latches,alarmdevices,delayedegress locks,accesscontrolledegressdoors,Panichardware,Fire

    exithardware,Selfclosingdevices,Powereddoors,revolvingdoors,turnstiles,doorsinfoldingpartitions,

    balanced doors, horizontal sliding doors, stairs, curved stairs, spiral stairs, winders, landings, guards,

    handrails,bridgesandbalconiesetcshallcomplywithrelevantsectionsofNFPA5000&NPFA101.

    o) Corridors:Egresscorridorsshallnotbeusedasaportionofasupply,returnorexhaustairsystemserving

    adjoining areas. Air transfer opening(s) shall not be permitted inwalls or in doors separating egress

    corridors from adjoining areas. Exception: Toilet rooms, bath rooms, shower rooms, sink closets and

    similarauxiliary

    spaces

    opening

    directly

    onto

    the

    egress

    corridor.

    p) Stairways:Stairsshallbeconstructedofconcrete,steeloracombinationoftwo. Woodconstructionshall

    notbeused.Treadsshallbeprovidedwithnonskidnosingsoran integralabrasive ineh treadsurface.

    Stairways that are part of the egress pattern shall havewidths, run lengths, landings, treads, risers,

    handrails, guardrails, headroom, door sizes, door swings, door ratings, interior finishes,windows and

    otheropeningsinaccordancewithNFPA101andNFPA80.

    q) Scissorstaircasesarenotpermitted

    Guidelinenotes:

    i Exitshallbeeitherofhorizontalorverticaltype.Anexitmaybedoorway,corridorandpassagewaystoan

    internalstaircaseorexternalstaircase,rampsortoverandahorterraceswhichhaveaccesstothestreetor

    toroof

    of

    abuilding.

    An

    exit

    leading

    to

    an

    adjoining

    building

    at

    the

    same

    level.

    ii Doorsofsmallindividualroomssuchasofficesarenotconsideredasexitsunlesstheyactuallyleaddirectly

    totheopenair.

    iii Doorsoflargeroomsareconsideredtobeexits.

    iv Aninteriorpassagewaydoesnotbecomepartofanexituntilitisenclosedasafirecompartmentwithatleasthalfanhourfireresistance.

    v Whereanexternalstairwayexistsitshallbeensuredthattheuseofitatthetimeoffireisnotprejudiced

    bysmokeandflameissuingfromopenings(e.g.Windows,doors)intheexternalfaceofthebuilding.

    vi Internal stairways [asmeans of escape/egress] shall be suitably enclosed or protected as necessary to

  • 7/27/2019 fireprotectionfirepreventionfirecontrolregulations2010edition

    20/167

    - 16 - - 16 -

    affordreasonablesafetytooccupantsandtopreventspreadoffire,smokeorfumesthroughthevertical

    stairwayopening.

    vii Lifts,escalators,andrevolvingdoorsnottobeconsideredasEXITS.

    viii Adequatecapacityofallescapesroutepaths/passageways.

    ix Protectionforescapepaths/passageways:a) Mark/signpost.

    b) Markexitpaths/passagewaysclearlyandlightthem.

    c) Restrictfuelloadsandfinishesinexitpaths/passageways.

    d) Enclosestairways.

    x Useconstructionbarrierstokeepfireout.

    xi Usesmokecontrolmethodstoprotectatmosphereinexitpaths.

    xii Escapetooutsideortoprotectedplaceoradequatedefenseofplaceswhereoccupantsshouldremain.

    xiii Avoidanceofmakeshiftsecurityarrangements.

    xiv Escaperoutesshallbelightedinsuchamannerthattheycanbeusedinafirewhenafailureofalocalelectricalcircuitisprobable.

    xv EscapelightingshallbedistinguishedfromtheEmergencylightingwhichmightbeprovided,onfailureof

    amainssupply,byastandbygenerator. Suchemergencylightingprobablywillnotfunctioninafiredue

    tolocalcircuitfailureandescapelightingshallbeprovidedbyselfcontainedfittingswhicharecapableof

    runningfor

    aset

    period

    of

    time.

    The

    provisions

    of

    NFPA

    70

    (Article

    700)

    shall

    be

    complied

    with.

    xvi Escapelightingsshallbeprovided/sitedatbutnotlimitedtothefollowing:

    a)EachExitDoor.

    b)NearEachStaircaseSoEachFlightReceivesDirectLight.

    c)EachOtherChangeofFloor.

    d)NearChangesofDirection.

    e)NearEachIntersection.

    f)NearEachFireAlarmCallPoint.

    g)NearFireFightingEquipment.

    h)OutsideEachFinalExitandClosetoit.

    i)LiftCars.

    j)

    Plant

    Rooms.

    Escapelightingsshallalsobeprovidedtoilluminateexitsandsafetysigns.

    xvii Egress lightsare fixturesconnectedtonormalpowersupplysystemsandare to functionsatall timeswhenthebuildingisoccupied.

    xviii Emergencylightsorstandbylightsarenormallybatterytypeemergencyunitequipmentthatprovidenoilluminationuntilfailureoftheegresslightingcircuit. Theseunitsserveasabackupforegresslights.

    xix Thecolouroftheexitsignsshallbegreen.

    Part(5)Sections1to30

    (Miscellaneous)

    1. CriteriaforstorageconfigurationforJAFZAPBUs/LIUs.(RefertoAppendix 10)

    2. HazardousAreaProtectionconcerningAssemblyOccupancies,HotelsandDormitories:

    RelevantprovisionsofNFPA5000andNFPA101shallapply.

    3) BuildingRehabilitation

    RelevantprovisionofNFPA5000dealingwithrepair,renovation,modification,reconstruction,changeofuse

    andchangeofoccupancyclassification,addition,damagedorunsafebuildings,historicbuildings&structures

    etc.shallapply.

  • 7/27/2019 fireprotectionfirepreventionfirecontrolregulations2010edition

    21/167

    - 17 - - 17 -

    4) SafeguardsDuringConstructiona) RelevantprovisionsofNFPA5000,NFPA241,NFPA70&NFPA1dealingwithsafeguardingconstruction,

    alteration,demolitionoperations,protectionofutilities,temporarylight&poweranduseofexplosivesetc.

    shallapply.(RefertoAppendix11)

    b) Separatealloccupiedareas fromdemolition, renovation,orconstructionactivitiesby temporary smoke

    tightconstructionpartitionsofgypsumboardorotherapprovednoncombustibleor limitedcombustible

    material in accordancewith the requirements ofNFPA 241. Barrier design shall be detailed in project

    documents.

    Partitionsshallbefullheight,extendingthroughsuspendedceilingstothefloorslaborroofdeckaboveand

    shallbe

    one

    hour

    fire

    rated,

    unless

    sprinklers

    are

    installed

    and

    are

    operational

    on

    both

    sides

    of

    the

    temporarypartitionwhereuponthepartitionmaybepermittedtoterminateattheceiling inaccordance

    withNFPA241.

    Note: Thisrequirementisduetotheinherentlygreaterpotentialforfireorhazardousmaterialsincidents

    associatedwiththecombustiblesandoperationsofdemolition/construction. Thisrisk ismadeworseby

    thelikelihoodofcompromisedfireprotectionsystemsandfire/smokeresistantconstruction.Thisdoesnot

    obviate the need to provide other protectivemeasures to contain dust and debris as required by EHS

    regulations.

    Sprinklersareconsideredtobeoperationalwhentheyare installed inaccordancewithNFPA13(spacing,

    protection,distancefromtheceiling,etc.)andthereisasufficientautomaticwatersupply.

    Phaseconstructionasnecessarytoensurethatexitsarenotobstructedorreduced inwidth.Ifexitsmust

    beobstructed

    during

    construction,

    provide

    alternate

    exit

    routes

    during

    each

    phase

    of

    construction

    and

    identifythealternateroutesontheconstructiondrawings.

    Minimizeoravoiddisruptions to firealarmand sprinkler systems. Delineatephasingof construction to

    ensurethat installationsofnewsystemsareexpedited,andwherepossible,maintainexistingsystems in

    serviceuntilthereplacementsystemisoperational.

    c) Stopwork:Theconsultantsandthemaincontractorsshallberesponsibleforensuringthattheconstruction

    ofbuildings, facilitiesor structures is carriedout in compliancewith the required standards.They shall

    immediately stop the work when contrary is observed in order to (i) correct any deviation from the

    requirementsofEHSFireDept./AHJand(ii)correctorabateanunsafeconditionposingsignificantriskof

    fire,explosionoraccident.

    d) Theconstructionworkthat isnot inconformancewiththerequirementsofEHSFireDept./AHJshallbesubjecttorectificationwhichmayincludestoppageoftheworkanddemolition.

    e) Removal of Construction Debris: The consultants, Contractors& Subcontractors shall ensure that all

    hazardous,Combustibleand flammableconstructiondebrisare removedregularly fromconstructionsite

    anddisposedofinaccordancewiththerequirementofEHSDept.

    5) Temporary buildings, facilities or structures at construction sites for the use of offices and labour

    accommodation:

    a) Writtenrequestforapprovalofconstructionoftemporarybuildings,facilitiesorstructuresatconstructionsitesshallbesubmittedtoEHSFireDept.

    b) EHSFireDeptreservestherighttoapprovesuchbuildings,facilitiesorstructures.

    (Referto

    Appendix

    12).

    6) Covered temporary structures Enclosed tents normally used for events/activities such as stage shows,

    concerts,circus,exhibitions,tradefairs,sportingevents&celebratoryfunctions:

    a) WrittenrequestforapprovalforconstructionoftemporarystructuresshallbesubmittedtoEHSFireDept.

    b) EHSFireDeptreservestherighttoapprovesuchstructures.(RefertoAppendix13)

    7) MarinasandBoatyards:

    a) MarinecraftshallcomplywiththelawsoftheUAEandNFPA302FireProtectionStandardforPleasureandCommercialMotorCraft.

  • 7/27/2019 fireprotectionfirepreventionfirecontrolregulations2010edition

    22/167

    - 18 - - 18 -

    b) Allboatsanddockingareasshallbeequippedwithportablefireextinguishers. Thenumberandtypeof

    extinguishersshallbeasspecifiedinNFPA302.

    c) Smokedetectorsshallbeprovidedonboatshavingsleepingquarters.

    d) Allinboardpoweredboatswithanenclosedenginecompartmentshallhaveafiresuppressionsystemintheenginespace.

    e) Watersupplyforfireprotectioninmarinas,piers,andboatyardsshallbeprovidedinaccordancewiththelatesteditionsofNFPA13StandardfortheInstallationofSprinklerSystems,NFPA14Standardforthe

    InstallationofStandpipesandHoseSystems,andNFPA24StandardfortheInstallationofPrivateFire

    ServiceMainsandTheirAppurtenances.

    f) Standpipesshall

    be

    provided

    for

    piers

    or

    marine

    docks

    where

    the

    hose

    lay

    from

    the

    responding

    fire

    apparatusisinexcessof150feetlongperNFPA303FireProtectionStandardforMarinasandBoatyards,

    orwheredeemednecessarybyEHSFireDept

    RelevantprovisionsofNFPA303shallapply. Also,relevantEHSregulationsshallapply.

    8) MarineTerminals,PiersandWharves:

    RelevantprovisionsofNFPA307shallapply.Also,relevantEHSregulationsshallapply.

    9) QualityAssuranceDuringConstruction

    RelevantprovisionsofNFPA5000shallapply.

    GuidelineNote:

    Relevant

    chapters

    of

    NFPA

    5000

    dealing

    with

    energy

    efficiency,

    Elevators

    and

    conveying

    system,

    Plumbing

    system, Exterior wall construction, Interior Environment, High Hazard Contents, Structural Design; Soils,

    FoundationsandRetainingWalls,RoofAssembliesandRoofStructures,FloorResistantDesign&construction,

    Encroachments into thepublicRightofway, concrete,Aluminum,Masonry, Steel,WoodGlassandGlazing;

    GypsumBoard,LathandPlasterandPlasticsshallapply.

    10)PerformanceBasedDesign(PBD):

    a) RelevantprovisionsofNFPA101andNFPA5000shallapply.

    b) Performancebasedfiresafetydesignmethodsshallbeappliedtotherenovation,restoration,remodeling

    ormodernization of existing facilities to address the evaluation of a sub system, system or complete

    buildingwhenitisnotpossibletomeettheprovidedprescriptiverequirementsfornewconstruction.

    c) Newbuildings,

    facilities

    or

    structures

    for

    which

    established

    prescriptive

    NFPA

    code

    criteria

    exist

    shall

    not

    be

    permittedtouseperformancebasedfireandlifesafetydesignmethods.

    d) Performancebased fire safety design methods may be permitted by EHSFire Dept / AHJ for uniquefacilitieswhere the usermandates requirements and objectives that are not addressed by established

    prescriptiverequirementsofNFPAcodesortheseregulations.

    e) PerformancebasedfiresafetydesignmethodsshallnotbeusedtoeliminaterequiredexitingrequirementsnorshallitbeusedtoeliminateautomaticsprinklersystemsrequiredbyrelevantNFPAcodes.

    f) Performancebased fire safetydesign report shallbepreparedby theconcerned fireprotectionexpert /specialist indicating that thebuilding, facilityor structurewasdesignedusing a performancebased fire

    safetydesignapproachasmaypermittedbyEHSFireDept/AHJ. Itshallconvey theexpectedhazards,

    risksand systemperformanceover theentirebuilding lifecycle. It shallalso include theproject scope,

    designgoals

    and

    objectives,

    performance

    criteria,

    design

    fire

    scenarios,

    critical

    design

    assumptions,

    critical

    design features, final design, design engineers qualifications & capabilities and data and evaluation

    methodreferences.(RefertoFireDeptforrelevantproceduretobefollowed).

    11)StandbyPower

    a) A standby emergency / electric generator shall be installed to provide power to staircase, emergencylightingsystemsfirelifts,firepumps,pressurizationfanandblowers,smokeextractionanddampersystem

    incaseoffailureofnormalelectricalsupply.Thegeneratorshallbecapableoftakingstartingcurrentofall

    themachinesandcircuitsstatedabovesimultaneously.

    b) RelevantprovisionsofNFPA101,110&NFPA111shallapply.

  • 7/27/2019 fireprotectionfirepreventionfirecontrolregulations2010edition

    23/167

    - 19 - - 19 -

    12)Basements

    a) RelevantprovisionsofNFPA5000includingthatofundergroundspacesshallapply.

    b) Thebasementshallnotbenormallyusedforresidentialpurposes.

    c) Theaccesstothebasementshallbeseparatefromthemainandalternatestaircaseprovidingaccessand

    exitfromhigherfloors.Wherethestaircaseisincontinuousthesameshallbeofenclosedtypeservingasa

    fire separation from the basement floor and higher floors. Open ramps shall be permitted if they are

    constructedwithin the building line subject to the condition that adequate arrangements aremade to

    prevententryofsurfacedrainageintothebasement.

    d) Eachbasement

    shall

    be

    separately

    ventilated.

    The

    standard

    of

    ventilation

    shall

    be

    the

    same

    as

    required

    by

    the particular occupancy or relevant NFPA codes. Any deficiency shall bemet by providing adequate

    mechanicalventilationintheformofblowers,exhaustfans,airconditioningsystemsetc.

    e) Thebasementshallnotbepartitioned.

    13)ElectricalServices/Systems:

    a) RelevantprovisionsofNFPA5000shallapply.

    b) Theelectricaldistributioncables/wiringshallbe laid inseparateduct.Theductshallbesealedatevery

    floorwithnoncombustiblematerialshavingthesamefireresistanceasthatoftheduct.

    c) Watermains,telephonelines,gaspipesoranyotherservice lineshallnotbelaidintheductforelectrical

    cables.

    d) Separate circuits for fire and other pumps, water pumps, lifts, staircases, and corridor lighting andpressurizingsystemshallbeprovideddirectlyfromthemainswitchgearpanel.

    e) AllelectricalservicesshallbesubjecttoDEWAapproval.

    14)MechanicalSystems:

    RelevantprovisionsofNFPA5000shallapply.

    15)AirConditioning,Ventilation&SmokeManagementSystems

    a) WarmAirHeatingandAirConditioning systemsshallcomplywithNFPA90Bforfollowingoccupancies:

    i) One ortwo familydwellingsorii) Serve

    spaces

    not

    exceeding

    708

    Cu.

    M.

    b) Installationof AirConditioning systemsshallcomplywithNFPA90Afor followingoccupancies:

    i) ServeBuildingsofTypesIII,IVandVconstructionof heightover3storiesii) Servespacesexceeding708Cu.M.

    c) SmokeExtractSystemsshallcomplywithNFPA91.d) SmokeControlSystemsshallcomplywithNFPA92A.

    e) SmokeManagementSystemsshallcomplywithNFPA92B.

    (RefertoAppendices14&15)

    f) Standard for ventilation Control and fire protection of commercial cooking operationNFPA 96 shall be

    compliedwith.

    16)Transformers:

    Indoor and outdoor transformers shall be installed and located in accordance with the requirements /

    standardsofDubaiElectricityandWaterAuthority(DEWA)

    17)StationeryCombustionEngines,GasTurbinesandGenerators:

    Engines,gasturbinesandgeneratorsshallbeinstalledinaccordancewiththerequirementofNFPA37.

    18)GasService:

  • 7/27/2019 fireprotectionfirepreventionfirecontrolregulations2010edition

    24/167

    - 20 - - 20 -

    GasservicemainsshallbeinstalledinaccordancewiththerequirementsofNFPA54andNFPA58GasService

    mains shall not be permitted within the perimeter of foundation lines. Natural draft cross ventilation for

    buildingcrawlspacescontaininggasservicepipingshallbeprovided.Supplyconnectionsfromthegasservice

    mainsabovegradeoutsidethefoundationwallshallberaisedandpassedthroughafullswingjointorloopof

    metallictubingbeforeenteringthebuilding.Thiswillavoidpiperuptureintheeventofdifferentialsettlement

    or earthquake. Pressure regulators shall be located outside of buildings or vent to the outside. Refer to

    Appendix 16.

    19)InformationTechnologyFacilities:

    a) Inaddition

    to

    compliance

    with

    NFPA

    75,

    mission

    critical

    IT

    spaces,

    research

    laboratories,

    and

    other

    operations vital to stakeholders/owner shall be protected by the following active and passive fire

    protectionmeasures:

    i. 2hourfireratedenclosures.

    ii. Veryearlywarningsmokedetection.

    iii. Cleanagentfiresuppressionsystemorotherapprovedactivesystem.

    iv. Cleanagent,watermist,orCO2portablefireextinguisherandonewaterextinguisherforclassAfires.

    v. Asignshallbelocatedadjacenttoeachfireextinguishertoplainlyindicatethetypeoffireforwhichitisintended.

    vi. Drychemicalfireextinguishersshallnotbepermitted.

    b) Combustiblestorage,suchaspaperstock, inks,andunusedrecordingmediawithinthecomputerroom

    shallbe

    restricted

    to

    the

    minimum

    necessary

    for

    efficient

    operations,

    and

    shall

    be

    stored

    in

    closed

    metal

    cabinets.

    c) LAN rooms and similar second tier IT spaces shallbeenclosedwith1hour fire rated construction,be

    protectedwithsprinklersandsmokedetection,andkeptfreeofcombustiblestorage.

    d) Where trash receptacles are specified as part of the design only noncombustible containers shall be

    specified.

    20) UtilityRooms,ShopAreasandIncidentalUseSpaces

    a) Combustiblematerials(e.g.,lumber,plastic,mountingboards,etc.)shallnotbestockpiledinshopareas,

    butshallbestored indesignatedstorageareas. Theseareasshallbeseparatedfromadjacentspacesby

    1hour fireratedconstructionandprotectedwith firesuppressionsystemsdesignedspecifically forthe

    fuelloadandstorage

    b)

    c) .econfiguration.

    d) Unsprinkleredstorageroomsandsprinkleredstorageroomsover100sq.ft.(9.3sqm)shallbeenclosed

    with1hourratedfirebarriers.

    e) IncidentalUseareasshallbeenclosedwithratedbarriersasrequiredbyapplicablecodesandstandards.IneachcasethemostrestrictiverequirementofNFPAcodesandthese regulations shall be followed.

    21.TrashDumpsters

    Iflocatedinsideorwithin30feet(10m)ofabuilding,trashdumpstersshallbeplacedwithina2hourfire

    ratedroomandprotectedwithautomaticsprinklers.

    22.Laboratoriesa) Designoflaboratories shallbeinaccordancewiththerequirementsoftheIBC,NFPA45.

    b) All designs for laboratory spaces shall follow the lab unit approach as defined in NFPA 45. Wherequantitiesofhazardousmaterialsstoredwithin labunitscanbeshowntoalsocomplywiththecontrol

    arearequirementsofNFPA45shallapply.

    c) Wherethequantitiesofhazardousmaterialsand/orthenumberoflabunitsonagivenlevelofabuildingexceedthelimitationsestablished,therequirementsofNFPA45shallgovernthedesign.

    d) InallcasesthesprinklersystemrequirementsofNFPA45shallbefollowedforlaboratories.

    e) Limitationson allowablequantitiesof corrosives, toxic chemicals, andotherhazardous materials,not

    addressedbyNFPA45shallcomplywiththerequirementsoftheInternationalBuildingCode(IBC)

  • 7/27/2019 fireprotectionfirepreventionfirecontrolregulations2010edition

    25/167

    - 21 - - 21 -

    23. FlammableandCombustibleLiquidsa) Thestorageandhandlingofflammableandcombustibleliquidsshallcomplywith NFPA30Flammableand

    CombustibleLiquidsCode,andthefollowingrequirements:

    i. Flammable liquid storageareas shallbe separated fromotherareasbybarriershavingaminimum2hourfirerating.

    ii.Insprinklered flammable/combustible liquidsstorageareas,containmentmeasures fortheanticipated

    sprinkler system discharge shall be considered, in addition to the requirements of diking, remote

    impounding,andothercontainmentmeasures.

    24. AnimalHousingFacilitiesa) AllAnimalHousingFacilities[ifandwherepermitted]shallcomplywithNFPA150,StandardonFireand

    LifeSafetyinAnimalHousingFacilities.

    b) AFireProtection/Life SafetyBasisofDesignnarrative shallbeprepared foreach renovationandnewconstructionprojectthataffectsanimalhousingfacilities. Thisnarrativeshalldescribehowthefireand

    lifesafetysystemscomplywithNFPA150.

    c) Means of egress shall be designed to meet the special requirements of animals and/or equipment

    necessaryforegress.

    d) All fire protection designs shall take into consideration the animals ability to reach the equipment,

    potentiallyharmingtheanimalortheanimaldamagingtheequipment.

    e) All fire alarm systems shall take into account theneed for apushbutton that silences the fire alarmnotificationappliancesintheanimalareasonly,butthatactivatesasilentredbeacontoindicatethatthe

    system

    is

    still

    in

    alarm.

    f) Smokeexhaustsystemsshallbeperformancebasedandshalltake intoconsiderationtoxicitylevels,thetemperature,thesmokelayerheightbasedontheanimalbreathingzone,and the risks of exposure to

    the animals during a fire condition.

    25. CollectionStorageFacilitiesRefertoAppendix53.

    26. SignboardsandNameplatesforCompanyPremises:

    a) Developers/lessees/licenseesarerequiredtoerectsuitablesignboardsontheirpremisesforwhichthey

    areresponsible. Thedesign,size,colouringand locationofthesignboardshallbeapprovedbyPCFCCivil

    Eng.department.

    b) Selfilluminated

    signs

    (e.g.

    Neon)

    are

    not

    normally

    permitted.

    c) Written request for installationof selfilluminated signs,wherejustified, shallbe submitted to EHSFireDept.

    d) EHSFireDeptreservesrighttoapproveselfilluminated/neonsigns.

    e) SignboardsarenotrequiredforOfficeLessees. However,OfficeLesseesarerequiredtohaveaNameplateinstalled,manufactured from3mmthickBassandgradconformingtoAmericanstandardASTMB26.This

    shallbelocatedexternally,adjacenttotheofficeentrance.

    f) In the event of relocating / vacating premises, all sign boards and nameplates shall be transferred /removedbythedevelopers/lessees/licensees.

    27. LighteningProtection:

    Thebuildingsthatshallbeprotectedbylighteningprotectionsystem(s)inaccordancewithrelevantprovisions

    ofNFPA780includebutnotlimitedtothefollowing:

    (a) Ordinarystructures

    (b) Miscellaneousstructures,specialoccupancies&highrisebuildings

    (c) Heavydutystacks(d) Structurescontaining flammablevapours, flammablegasesor liquidsthatgivesoff flammablevapours

    (RefertoAppendix 17)

    28. MissionCriticalFacilities:

    Allmissioncriticalareasshallbe identifiedandprovidedwithspecialprotection inaccordancewithrelevant

    NFPAcodes.

  • 7/27/2019 fireprotectionfirepreventionfirecontrolregulations2010edition

    26/167

    - 22 - - 22 -

    29. Fitoutworks/TIEINCONNECTIONSofSprinklers,Standpipes,FirePumpsandFireAlarmsystemsinRetails&

    Carparkextensions:

    (a) Tenants / fit out works contractor shall be obligated to induce strict compliance with relevant

    provisionsofPart 2(Appendix2,Subsection3,FitoutworksRequirements)ofDubaiWorld/EHS

    FireProtection,FirePrevention&FireEmergencyControlRegulations.

    (b) Alltenants fitoutworksconcerning fireprotection including firealarmsystem(floorand room layoutspecific)are subject toEHSFiredepartmentapprovalandshallconform toandbecompatible

    withalldesigncriteriaanddescripti