Ministry of Communication
s &Information Technology
e-Government Strategy and Implementation Plan - ReportJanuary 2011
E-Government Strategy and Implementation Plan
PricewaterhouseCoopers Page 2Confidential
'This report has been prepared for and only for MCIT, Government of Ethiopia, in accordance with the terms of our contract agreement package no EICTDA/C-09/10 Credit No 3899-ET dated June 2010 and for no other purpose. We do not accept or assume any liability or duty of care for any other purpose or to any other person to whom this report is shown or into whose hands it may come save where expressly agreed by our prior consent in writing.'
© 2010 PricewaterhouseCoopers. All rights reserved. “PricewaterhouseCoopers” refers to the network of member firms of PricewaterhouseCoopers International Limited, each of which is a separate and independent legal entity.
E-Government Strategy and Implementation Plan
Document Control
Overview PwC has been engaged as a consultant by MCIT, Government of Ethiopia, for development of National e-Government Strategy and designing the Ethiopian e-Government Strategy and Implementation Plan
Document Title Final e-Government and Implementation Plan Report
Document Status
Revised Submission based on inputs from Final Workshop
Abstract This document elaborates the strategy and Implementation roadmap of Federal Government of Ethiopia.
Document Publication History
Date Author Version
Remarks
27-September-2010 Avinash Kaushik 1.0 Creation of template
5-October-2010 Raj Kamal Singh, Anurag Johri, Avinash Kaushik
1.1 Creation of First draft
15-October-2010 Anurag Johri, Avinash Kaushik, Raj Kamal Singh
1.2 Creation of Second draft
28-October-2010 Nilachal Mishra, Prasad Unikrishnan, Anurag Johri, Raj Kamal Singh
1.3 Creation of Third draft
7-Nov-2010 Nilachal Mishra, Prasad Unikrishnan, Anurag Johri,
1.4 Updated draft based on MCIT comments
24-Nov-2010 Nilachal Mishra, Prasad Unikrishnan, Anurag Johri,
1.5 Updated draft based on MCITcomments
15th December-2010 Nilachal Mishra,
Prasad Unikrishnan,
1.6 Updated draft based on workshop comments
19th December-2010 Prasad Unikrishnan, 1.8 Revised Report Finalization
13th January, 2011 Nilachal Mishra 1.9 Final Report
Reviewers
Date Reviewers Version Remarks
8-October-2010 Nilachal Mishra 1.1 Review and Comments
18-October-2010 Nilaya Varma 1.2 Review and Comments
PricewaterhouseCoopers Page 3Confidential
E-Government Strategy and Implementation Plan
30th October -2010 Nilaya Varma 1.3 Final Review
3rd Nov - 2010 Dr Mesfin, Mr Damtew, MCIT
1.3 Review and comments in workshop mode
15th November -2010
Dr Mesfin, Mr Damtew, MCIT
1.4 Review and comments
30th November- 2010
Internal Workshop 1.5 Review and comments in workshop mode
17th December,2010 Nilaya Varma 1.6 Review & Comments
11th January, 2011 Final Workshop 1.7 Discussion and Comments
9th February, 2011 Final workshop Inputs & Feedback
1.8 Feedback comments
26th February Feedback comments 1.9 Comments of Mr. Damtew
PricewaterhouseCoopers Page 4Confidential
E-Government Strategy and Implementation Plan
Table of Contents
I. Introduction..................................................................................................................................... 14
I. Project Scope.............................................................................................................................................14
II. Structure of this report............................................................................................................................15
III. Mapping of the Report to areas to be covered in the contract.......................................................16
IV. Project Status.............................................................................................................................................17
V. Limitations of the report..........................................................................................................................19
II. Executive Summary....................................................................................................................... 21
I. Outcomes and Targets.............................................................................................................................25
II. Strategic Dimensions................................................................................................................................29
III. Governance Structure...................................................................................................................39
I. Drivers for the Governance Structure..................................................................................................39
II. Governance Structure: Options and Recommendations...................................................................40
III. Recommended Governance Structure..................................................................................................44
IV. Strategic Dimension 1 - e-Services Enablement......................................................................57
I. Introduction................................................................................................................................................57
II. Guiding Principles for electronic enablement of Service.................................................................57
III. Recommendations and Targets..............................................................................................................58
IV. Agency Priority Projects..........................................................................................................................58
V. Agriculture Services.................................................................................................................................61
VI. Benefits Management System................................................................................................................65
VII. Education....................................................................................................................................................67
VIII. E-Health.......................................................................................................................................................71
IX. E-Trade........................................................................................................................................................ 74
X. Employment................................................................................................................................................79
XI. Transport..................................................................................................................................................... 82
XII. Tourism........................................................................................................................................................86
XIII. Tax................................................................................................................................................................ 91
XIV. e-Court......................................................................................................................................................... 94
XV. Municipalities.............................................................................................................................................97
XVI. Passport & Visa........................................................................................................................................108
XVII. National Data Set:...................................................................................................................................113
XVIII. National Enterprise Service Bus:.........................................................................................................114
XIX. National Integrated Authentication Framework:.............................................................................116
XX. National Payment Gateway:..................................................................................................................118
XXI. Public Key Infrastructure......................................................................................................................120
XXII. Woreda Net...............................................................................................................................................122
XXIII. Data Center..............................................................................................................................................123
PricewaterhouseCoopers Page 5Confidential
E-Government Strategy and Implementation Plan
XXIV. National Enterprise Architecture Framework..................................................................................125
XXV. Common Applications.............................................................................................................................128
XXVI. e-Procurement..........................................................................................................................................128
XXVII.Government wide HRMS.......................................................................................................................129
XXVIII. Financial Management Information System.............................................................................130
XXIX. eOffice / Document Management........................................................................................................131
XXX. Government wide email system...........................................................................................................132
V. Strategic Dimension 2 - Channels.............................................................................................134
I. Introduction..............................................................................................................................................134
II. Current Status.........................................................................................................................................134
III. Summary of the status of the different channels is as below –.....................................................135
IV. Guiding Principles for Channels Strategy..........................................................................................135
V. Recommendations and Targets............................................................................................................136
VI. e-Government Portal...............................................................................................................................137
VII. Contact Center.........................................................................................................................................140
VIII. Mobile Gateway.......................................................................................................................................143
IX. Common Service Center........................................................................................................................147
X. Channel Migration Strategy.................................................................................................................149
VI. Strategic Dimension 3 - Enablers.............................................................................................151
I. Capacity Building....................................................................................................................................151
II. Monitoring and Evaluation....................................................................................................................161
III. Marketing and Awareness.....................................................................................................................169
IV. Standards and policies...........................................................................................................................182
V. Public Private Partnerships (PPP).......................................................................................................187
VII. Over all Implementation Plan and Timelines..........................................................................199
I. Overall Implementation Plan................................................................................................................199
II. Sample Detailed Implementation Plan and RACI Chart for Education Priority project..........204
III. Portal Implementation Plan and Timelines........................................................................................210
IV. ICT Center Implementation Plan and Timelines..............................................................................213
V. Contact Center Implementation Plan and Timelines.......................................................................215
VI. Mobile Implementation Plan and Timelines......................................................................................217
VII. Capacity Building Implementation Plan and Timelines..................................................................219
VIII. Marketing and Awareness Plan and Timelines.................................................................................222
IX. Public Private Partnership - Plan and Timelines..............................................................................223
VII. Cost Estimation & Funding........................................................................................................227
I. Budgetary Estimates..............................................................................................................................227
II. Funding Framework...............................................................................................................................229
III. Program funding Options......................................................................................................................231
IV. Fund Management Framework (FMF)...............................................................................................233
PricewaterhouseCoopers Page 6Confidential
E-Government Strategy and Implementation Plan
V. Fund Allocation Process........................................................................................................................236
Annexures............................................................................................................................................. 240
Annexure I: Concept of Service Life Cycle....................................................................................240
Annexure II: PMO Staffing Requirements.....................................................................................242
Annexure III: Training Courses and Course Levels.....................................................................248
Annexure IV: Detailed Marketing and Awareness Strategy.......................................................251
Annexure V: Detailed Project Report - Template..........................................................................254
Annexure VI: Services Prioritization Framework.........................................................................256
Annexure VII: ICT Standing of Ethiopia – Some international Rankings.................................258
Annexure VIII: Risk in E-Government Strategy Implementation...............................................268
Annexure IX: Sample Project Management templates................................................................269
Annexure X: List of Services.............................................................................................................290
Annexure XI: Overview of Stakeholder Assessment.....................................................................304
Annexure XII: Scope of work for Baseline Survey Agency..........................................................310
Annexure XIII: Scope of work for Marketing and Awareness Agency......................................314
Annexure XIV: Job Descriptions of the IT Officials at the Ministry...........................................316
Annexure XV: Job Descriptions of the ITSG to support in the Ministries................................318
Annexure XVI: Key Considerations during Procurement Process.............................................319
Annexure XVII: Costing details of Individual Projects.................................................................321
PricewaterhouseCoopers Page 7Confidential
E-Government Strategy and Implementation Plan
List of Tables
Table 1: Mapping of the Report to areas to be covered in the contract...............................16Table 2: Outcomes and Targets............................................................................................25Table 3: Implementation Plan for common applications.......................................................33Table 4: Implementation Plan for Core Projects...................................................................34Table 5: e-Services Implementation Plan for the Channels..................................................36Table 6: Overall Implementation Plan..................................................................................37Table 7: Options for sponsorship..........................................................................................40Table 8: High Committee Assessment..................................................................................41Table 9: Technical Committee..............................................................................................41Table 10: PMO Options.........................................................................................................42Table 11: Ownership of IT Initiatives....................................................................................43Table 12: Role and Responsibilities of Ministry Level Organization Structure....................54Table 13: PMO Support........................................................................................................55Table 14: Agency Priority Projects.......................................................................................58Table 15: e-Service Enablement of Agency Priority Projects................................................59Table 16: Core Projects......................................................................................................108Table 17: Core Projects- Implementation Plan...................................................................109Table 30: Existing WOREDA Net........................................................................................120Table 19: Channel – Current Status....................................................................................133Table 20: e-Government Portal Implementation.................................................................136Table 21: Contact Centre Implementation Options............................................................139Table 22: Middleware required for Wireless Applications..................................................142Table 23: Mobile Gateway Implementation Options...........................................................143Table 24: Analysis of Options for ITSG...............................................................................152Table 25: Outsourced vs. Individual Recruitments.............................................................153Table 26: Target Groups for Training.................................................................................153Table 16: Training Levels...................................................................................................154Table 49: Government transformation index: key indicators..............................................162Table 50: Customer satisfaction index: key indicators.......................................................164Table 30: Marketing and Awareness Brief..........................................................................170Table 31: Message Development........................................................................................174Table 32: General Awareness Campaign Overview............................................................175Table 33: Development / Approval Process........................................................................177Table 34: Feedback, measurement of effectiveness and improvement..............................178Table 35: Regulations, Policies, Guidelines and Standards................................................180Table 36: PPP opportunities and Recommendations..........................................................187Table 37: ICT Events...........................................................................................................190Table 38: PPP Implementation Roadmap............................................................................192Table 39: Guidelines for leveraging PPP.............................................................................194Table 40 – Overall Implementation Plan.............................................................................197Table 41 – Education Project Implementation Plan............................................................202Table 42 – Portal implementation Plan...............................................................................208Table 43 – ICT Centre Implementation Plan.......................................................................211Table 44 – Contact Center Implementation Plan................................................................213Table 45 – Mobile Implementation Plan.............................................................................215Table 46 – Capacity Building Implementation Plan............................................................217Table 47 – Marketing and Awareness Implementation Plan...............................................220Table 48 – Public Private Partnership Plan.........................................................................221Table 48 – e-Government Strategy – Summary of Costs.....................................................225Table 48 – Funding Options................................................................................................229Table 51 – PPP Options.......................................................................................................230Table 52: Categories of fund...............................................................................................233
PricewaterhouseCoopers Page 8Confidential
E-Government Strategy and Implementation Plan
Table 53: Approval for allocation........................................................................................233Table 54: Lifecycle Event Description................................................................................238Table 55: PMO staffing Requirements................................................................................240Table 56: PMO Staffing Requirements...............................................................................244Table 46: Training Courses and Course Levels..................................................................246Table 47: Target Market Segments....................................................................................249Table 48: Effectiveness of Media Channels by Marketing Segments.................................250
PricewaterhouseCoopers Page 9Confidential
E-Government Strategy and Implementation Plan
List of Figures
Figure 1: Project Status........................................................................................................18Figure 2 : e-Government Strategy and Goals.......................................................................22Figure 3: Key Strategic Dimensions.....................................................................................29Figure 4: e-Service enablement Plan....................................................................................32Figure 5: Recommended Structure.......................................................................................44Figure 6: Project Management Office (PMO) Structure.......................................................47Figure 7: ITSG Structure......................................................................................................50Figure 8: Capacity Balancer.................................................................................................51Figure 9: Ministry Level IT Organization Structure.............................................................53Figure 10: Core Projects.....................................................................................................110Figure 21: National Enterprise Service Bus.......................................................................113Figure 22: National Integrated Authentication Framework...............................................115Figure 23: National Payment Gateway...............................................................................117Figure 24: Public Key Infrastructure (PKI).........................................................................119Figure 23: Proposed Nationwide Data center Layout.........................................................121Figure 16: The overall EA reference model........................................................................125Figure 17: eProcurement....................................................................................................126Figure 18: IBEX System......................................................................................................128Figure 26: eOffice Components..........................................................................................129Figure 8: e-Government Portal...........................................................................................135Figure 21: Contact Center..................................................................................................138Figure 22: Mobile Gateway.................................................................................................141Figure 23: Four tier Architecture for Wireless Application Delivery..................................142Figure 11: Common Service Center...................................................................................145Figure 25: Capacity Building..............................................................................................149Figure 26: ITSG..................................................................................................................151Figure 27: Marketing and Awareness Plan.........................................................................167Figure 28: Continuous Improvement in Communications..................................................178Figure 29: Policy/Standards/Guidelines Framework..........................................................183Figure 30: Implementation Plan for Standards and Policies..............................................184Figure 31: Key Options for MOCIT.....................................................................................227Figure 32: Government Control/Risk..................................................................................228Figure 33: Fund utilization framework...............................................................................232Figure 34: Fund allocation prioritization............................................................................236Figure 35: Life-Cycle Services............................................................................................239
PricewaterhouseCoopers Page 10Confidential
E-Government Strategy and Implementation Plan
Abbreviations
Sr. No. Acronym Full Form
1. BCP/DR Business Continuity Plan/ Disaster Recovery
2. CAPEX Capital Expenditure
3. CB Capacity Building
4. CDT Common Data Terminals
5. CIO Chief Information Officer
6. CISA Certified Information Security Auditor
7. CISM Certified Information Security Manager
8. CISSP Certified Information Systems Security Professional
9. CoE Centre of Excellence
10. CRTC Computer Refurbishment and Training Center
11. CSC Common Service Centers
12. CTO Chief Technology Officer
13. DSC Digital Signature Certificate
14. e-GIFGovernment Information Systems Interoperability Framework /Standard
15. EICTDAEthiopian Information and Communication Technology Development Agency
16. EMD Earnest Money Deposit
17. ENDC Ethiopian National Data Centre
18. FEMSEDA Federal Micro and Small Enterprise Development Agency
19. GRS Grievances Redressal System
20. GoE Government of Ethiopia
21. HRMS Human Resource Management System
22. IBAS Integrated Budget Accounting System
23. ICT Information and Communication Technology
24. IT Information Technology
25. ITSG Information Technology Services Group
26. JCMS Judicial Case Monitoring System
27. KM Knowledge Management
PricewaterhouseCoopers Page 11Confidential
E-Government Strategy and Implementation Plan
Sr. No. Acronym Full Form
28. KPI Key Performance Indicator
29. KPO Key Performance Objectives
30. M&E Monitoring and Evaluation
31. MIS Management Information System
32. NDC National Data Centre
33. NOC Network Operating Centre
34. PKI Public Key Infrastructure
35. PMO Project Management Office
36. PPP Public Private Partnership
37. PR Public Relations
38. RDC Regional Data Centre
39. RFP Request for Proposal
40. SDLC System Development Life Cycle
41. SLA Service Level Agreement
42. SMS Scheme Management System
43. TCO Total Cost of Ownership
44. TNA Training Need Assessment
45. TVET Technical Vocational Education Training centers
46. VPN Virtual Private Network
47. WAN/MAN Wide Area Network / Metropolitan Area Network
48. WDMS Workflow and Document Management System
PricewaterhouseCoopers Page 12Confidential
.
Section 1 - INTRODUCTION
Development of e-Government Strategy and Implementation Plan
I. Introduction
Ethiopia’s Information and Communication Technology (ICT) policy is an integral part of the country’s larger development goals and objectives. While the goal is to rapidly transform the country’s subsistence agricultural-based economy and society into a predominantly knowledge- and information-based economy and society, the focus of the policy will be on the country’s ICT development process. To achieve this objective, the Government of Ethiopia has developed multiple policies, most notable of which are the National ICT Strategic Plan and the ICT4D Action Plan for the year 2006-2010.
The Ethiopian Information and Communication Technology Development Agency (MINISTRY OF COMMUNICATIONS & IT) has a mission to develop, deploy and use ICT to improve the livelihood of Ethiopians and optimize its contribution to the development of the country. The Agency has thus undertaken a number of e-Government assignments to avail government services online and improve the access to the general public. The Government Information System Development and Data Centre Administration team of the Agency is managing projects targeted towards development of integrated information systems to avail government services online.
However in the current context there was a need to integrate the ICT initiatives undertaken and provide a strategic direction for e-Government implementation in the country. It is in this context MINISTRY OF COMMUNICATIONS & IT has engaged PricewaterhouseCoopers Pvt. Ltd. for designing the National e-Government strategy and implementation plan for the Government of Ethiopia (GoE).
I. Project ScopeThe specific activities as agreed in the contract package no EICTDA/C-09/10 and Credit No 3899-ET include:
Establish a clear vision for e-Government tied up with the Agency’s mandates and come-up with a list of priority areas for e-Government program. (Define a vision that represents the priority objectives and the shared voice of all stakeholders as well as define strategies to communicate the vision to stakeholders);
Critically evaluate the National ICT Strategic Plan and the ICT4D-2008 e-Government Action Plan of the country and other policy and strategy related studies that the Agency has undergone;
Assess the country’s e-Government initiatives pursued in the Government ministries and implementing agencies;
Develop an approach whereby a clear vision that ensures that key constituents and communities will buy into and support e-Government programs is developed;
Identify models of e-Government that suits the country’s socio-economic conditions; and propose best model for Ethiopia’s specific case;
Develop a work plan to implement the priority e-Government projects [this work plan may focus on content development, competency building (training employees at all levels of the bureaucracy including senior officials), connectivity, cyber-laws, citizen interfaces, and capital plus others];
Propose options for government information and knowledge management schemes;
PricewaterhouseCoopers Page 14Confidential
Development of e-Government Strategy and Implementation Plan
Define approaches on measuring progresses through e-government development; Establish mechanisms for the continuing involvement of key stakeholders;
PricewaterhouseCoopers Page 15Confidential
Development of e-Government Strategy and Implementation Plan
II. Structure of this reportThe report is structured as follows:
Section 1 – Introduction
This section covers the Project Scope, current status of the project, mapping of the contents of the report to the contractual obligations, and limitations of this report.
Section 2– Executive summary
This section captures the background, Vision, Outcomes and Targets and summarizes the proposed e-Government Strategy.
Section 3 – Governance Structure
This section covers the proposed Governance structure required for the implementation of the Ethiopian e-Government Strategy.
Section 4 – Strategic Dimension 1 - e-Services Enablement
This section details the strategic dimension of e-Services enablement of 211 e-services comprising of seventy seven (77) informational and one hundred thirty four (134) transactional services over a five year period. The implementation is proposed to be done through twelve (12) priority projects and service delivery would be through four channels (Portal, Call centre, Mobile devices and Common service centres) and delivery will be facilitated and strengthened through Six (6) core projects, including National Payment Gateway, Enterprise Architecture framework, Public Key Infrastructure, National Data Set, National Enterprise Service Bus and National integrated Authentication Framework.
In addition – common applications which will horizontally cut across all ministries are proposed, which include initiatives like E-Procurement, Human resource Management System, E-Office, E-Mail and Financial management & Information System
Section 5 – Strategic Dimension 2 – Channels
This section covers the Implementation details of the service delivery channel enhancement projects that will enable the implementation of e-Government in Ethiopia
Section 6 – Strategic Dimension 3 - Enablers
This section covers the details of the key enablers to assure successful and timely implementation of the e-Government strategy and ensure the sustainability of the initiatives
Section 7 – Implementation and Timelines
This section describes the Implementation Plan for the Ethiopian e-Government Strategy along with the detailed timelines.
PricewaterhouseCoopers Page 16Confidential
Development of e-Government Strategy and Implementation Plan
Section 8 – Cost Estimates
This section provides the estimates of the costing and funds required for the rollout of the e-Government Implementation plan.
Annexure
This section covers the following:
I: Concept of Service Life Cycle
II: PMO Staffing Requirements
III: Training Courses and Course Levels
IV: Detailed Marketing and Awareness Strategy
V: Detailed Project Report - Template
VI: Services Prioritization Framework
VII: ICT Standing of Ethiopia – Some international Rankings
VIII: Risk in E-Government Strategy Implementation
IX: Sample Project Management templates
X: List of Services
XI: Overview of Stakeholder Assessment
XII: Scope of work for Baseline Survey Agency
XIII: Scope of work for Marketing and Awareness Agency
XIV: Job Descriptions of the IT Officials at the Ministry
XV: Job Descriptions of the ITSG to support in the Ministries
XVI: Key Considerations during Procurement
XVII: Costing details of individual Components
III. Mapping of the Report to areas to be covered in the contractThe table placed below maps the areas to be covered under the contract with the sections which cover those areas:
Table 1: Mapping of the Report to areas to be covered in the contract
S.No.
Areas Coverage in Report
1 Informational Needs and Transactional requirements of selected Ministry’s Customers
The Stakeholder Requirements have been captured through workshops and Survey of Stakeholders and have been presented in the VMO Report and the Stakeholder Assessment report. This information has been the source for formulation of the Strategy and Implementation plan presented in this report.
2 Accessibility of Citizen Services Section 5 addresses the accessibility and the
PricewaterhouseCoopers Page 17Confidential
Development of e-Government Strategy and Implementation Plan
S.No.
Areas Coverage in Report
delivery channels for providing the Citizen Services.5.4.1 e-Government Portal5.4.2 Contact Center5.4.3 Mobile Gateway5.4.4 Common Service Center5.4.5 Channel Migration Strategy
3 Business Applications to be e-enabled
Section 6.7 addresses the business applications to be enabled to provide the citizen services6.7 Common Applications6.7.1 e-Procurement6.7.2 Government wide HRMS6.7.3 Financial Management Information System6.7.4 e-Office / Document Management6.7.5 Government wide email system etc.
4 Integration of People, Process and technology using web to transform business models and maintain interoperability
Section 6 addresses the enablers which would be used to transform business models and maintain interoperability6.1 Capacity Building6.2 Monitoring and Evaluation6.3 Marketing and Awareness6.4 Standards and policies6.5 Public Private Partnerships (PPP)
5 Standards and guidelines for all services and processes
Section 6.4 covers the Standards and guidelines for all services and processes
6 Effective and efficient Utilization of Government Resources- Network Infrastructure necessary for providing e-services
Section 6 addressed the strategy for effective and efficient utilization of the Government resources.6.6 Core Projects6.6.1 National Data Set6.6.2 National Enterprise Service Bus6.6.3 National Integrated Authentication Framework:6.6.4 National Payment Gateway:6.6.5 Public Key Infrastructure6.6.6 Woreda Net6.6.7 Data Center
IV. Project StatusThe e-Government Strategy and Implementation project was initiated on 16th July 2010, with the kick off meeting, where senior members of MoCIT and PwC were present. As committed in the kick off meeting, PwC team has submitted the detailed Inception report
PricewaterhouseCoopers Page 18Confidential
Development of e-Government Strategy and Implementation Plan
covering Work Plan, Timelines of deliverables, Deployment Plan and Activities. Vision, Mission and Objective (VMO) workshop was conducted on 5th Aug 2010 to ascertain the vision and objectives of the e-Government Strategy. The PwC team also conducted a dip-stick study of 13 ministries and 11 agencies and a customer survey to understand the expectations and aspiration of the stakeholders from the e-Government Strategy. A draft report has been discussed with MoCIT Officials and a workshop was conducted on 30 th
November, 2010 where the report has been presented to all the MoCIT officials. Further the final workshop was held between the Ministries and Agencies to seek inputs for finalization of the Strategy. This report is a culmination of these efforts and presents the final recommendations and implementation plan based on the study
The figure1 overleaf shows the activities undertaken till date and the present status of the project.
PricewaterhouseCoopers Page 19Confidential
Development of e-Government Strategy and Implementation Plan Inception Report
Figure 1: Project Status
Confidential Page 20 of 399PricewaterhouseCoopers Page 20Confidential
V. Limitations of the report
The recommendations of the e-Government Strategy are based on the Assessment study of 13 Ministries and 11 Agencies that have participated in the study. The sample size of Ministries/Agencies was finalized during the inception Stage.
The information presented in the report is based on the inputs received through questionnaires and interactions with the Ministries/Agencies. No separate field validation study has been done on the data received from Ministries/Agencies.
The assessment study was done during the Months of August –September, 2010 and Undertaken by the Government was designed thereafter. However there has been an Organization Re-structuring of Ministries/Agencies in Ethiopia in Month of October, 2010, which has resulted in changes in the Strategy. PwC has captured the inputs on revised Governance Structure, during design of this report, however it may not be reflective of all the changes under the Government.
While, the strategy takes into account all common e-Government initiatives in the country and those in the participating organizations, there are bound to be independent and isolated initiatives that do not form part of the study and thus do not reflect in the strategy. However, this should not restrict the government to pursue other initiatives, as long as they are in conformance with the overall e-Government program.
The Voice of Customer (VoC) Survey was conducted based on sample size agreed between MINISTRY OF COMMUNICATIONS & IT and PwC in the contract and also during the inception stage, and it should be noted that it is a dip stick study and the findings are only indicative and not representative of the entire country.
Development of e-Government Strategy and Implementation PlanInception Report
ouseCooper
Section 2 – EXECUTIVE SUMMARY
Development of e-Government Strategy and Implementation PlanInception Report
II. Executive Summary
The Ethiopian Information and Communication Technology Development Agency (MINISTRY OF COMMUNICATIONS & IT) has a mission to develop, deploy and use ICT to improve the livelihood of Ethiopians and optimize its contribution for the development of the country. Towards this end, the agency has undertaken a number of e-Government initiatives to improve the internal efficiencies within the government organizations and to improve the access to government services for the general public. MINISTRY OF COMMUNICATIONS & IT realizes the need to integrate these initiatives to provide a strategic direction for e-Government implementation in the country. It is in this context that the e-Government strategy for Ethiopia has been designed, with a focus on facilitating effective delivery of government services to customers (residents, businesses and visitors).
The strategy envisages implementation of 219 e-services comprising of seventy seven (79) informational and one hundred thirty four (140) transactional services over a five year period. The implementation is proposed to be done through twelve (12) priority projects and service delivery would be through four channels (Portal, Call centre, Mobile devices and Common service centres) and delivery will be facilitated and strengthened through Six(6) core projects, including National Payment Gateway, Enterprise Architecture framework, Public Key Infrastructure, National Data Set, National Enterprise Service Bus and National integrated Authentication Framework.
In addition – common applications which will horizontally cut across all ministries are proposed, which include initiatives like E-Procurement, Human resource Management System, E-Office, E-Mail and Financial management & Information System
The Strategy has been design keeping the following guiding principles of e-Government
E-Government is focussed in creating a SMART (Simple Moral Accountable, Responsive and Transparent) Government;
E-government promotes causes of e-citizen and e-democracy; E-Government is not translating processes, however transforming processes; E-Government necessitates Capacity building within the Government; E-government aims networked and integrated government; E-government is citizen-centric; E-government provides multi-channel delivery of public services; E-Government aims in providing convenient access of information to all, and improving
service access & delivery; E-Government enables development & participation of all segments of population to
reap benefits of IT and also participate in the Governance process and be able to voice their opinions more effectively; and
E-Government supports in development and inclusion of Private Sector in public service delivery.
The e-Government strategy has a customer-centric focus so as to facilitate the delivery of services and information through alternate channels in a manner that is convenient for the citizens and is in line with their expectations and aspirations. Life cycle based
PricewaterhouseCoopers
Page 23Confidential
Development of e-Government Strategy and Implementation PlanInception Report
representation of services is a powerful tool towards this end and therefore, the strategy envisages the use of life-cycle events while electronically enabling the services.
As per the life cycle based concept, all services for a particular event, for e.g. ‘starting a business’ should be available under a single umbrella and the customer should not be required to have multiple touch points for the same. In addition to classifying and prioritizing services, services must be integrated at the back-end based on customer lifecycle approach. The services can be grouped by their customer base, and these can further be mapped onto the various customer lifecycle events, where they each respond to a particular need of the customer at a given time. Hence existing services can be identified based on life-cycle services approach for the various customer groups— citizens/residents, businesses, visitors and government employees. Life-cycle of events for the citizens/residents, business, visitors and government employees is discussed in detail in Annexure I.
In line with the above, Vision, Outcomes, targets and strategic plan for the Government of Ethiopia has been pictorially depicted in the figure overleaf. Each of the components depicted in the figure overleaf are further detailed in the next few pages. A brief of the proposed implementation plan for the strategy is also mentioned – thus encapsulating the complete E-Government Strategy and its implementation – in this chapter.
Figure 2 : e-Government Strategy and Goals
PricewaterhouseCoopers
Page 24Confidential
Development of e-Government Strategy and Implementation PlanInception Report
PricewaterhouseCoopers
Page 25Confidential
Development of e-Government Strategy and Implementation PlanInception Report
The vision of the e-Government strategy has four key elements:
1. Bring the Government closer to the people: The e-Government strategy aims to increase the awareness levels of the people regarding the services offered by the Government and their rights as customers and also make it easier for the customers to influence and participate in design of Government policies and schemes. This participation is expected to create a sense of ownership and a culture of higher compliance leading to closer ties between the government and the people.
2. Effective governance: The implementation of the e-Government strategy will lead to backend automation and adherence to a common set of policies and standards leading to better integration and information sharing amongst them and resulting in making the government organizations more effective and efficient in discharging their services and duties. Furthermore, capacity building to impart training to public servants on skills that will enable them to serve the customers in a more effective manner is an integral part of the overall e-Government strategy.
3. Improved service delivery: The sine qua non of the e-Government Strategy is the electronic enablement of 219 services to be delivered through alternate channels such as the internet, mobile, call centre and the citizen facilitation centres. The introduction of these alternate channels will empower the people with the choice of how, when and where they interact with the government to facilitate a “no-wrong door policy” which will further improve the customer satisfaction levels with the government services. It is also envisaged that electronically enabled services would be not only faster, and easier to demand and avail but will also have pre-defined and published service levels thereby leading to a visible enhancement in quality of service delivery.
4. Socio-Economic growth: The implementation of the e-Government program will benefit through participation of the private sector and deployment of its resources, entrepreneurship and competence. At the same time, the private sector would also benefit through the e-Government program as government services will be delivered faster and at a lower cost to the customers thereby resulting in lower cost of doing business. This is likely to foster a symbiotic environment that would promote economic growth and sustainability of the e-Government initiatives.
PricewaterhouseCoopers
Page 26Confidential
Development of e-Government Strategy and Implementation PlanInception Report
I. Outcomes and TargetsIn order to measure and manage progress, it is imperative to define key outcomes and targets that would enable realization of the vision. Also linkages with the National ICT policy Goals have been provided in the table below:
Table 2: Outcomes and Targets
Outcomes and Targets Description
Element of Vision: Bring government closer to the people
Outcome 1: Customer participation in Government policy/scheme design
Target 1 - Ethiopia to be amongst the top 30 countries in the world in the e-Participation index of UN by the year 2015 (Ranked 135 in 2010): Most countries are using electronic channels to understand firsthand the views, expectations and aspirations of their people. UN’s e-Participation index measures the progress made by all the member countries in doing the same. It is envisaged that the e-Government portal as well as other alternate service delivery channels will facilitate the citizens in putting forth their feedback and preferences on national issues.
Target 2: Customer Feedback Mechanism available on all Government Channels: A comprehensive Grievance redressal mechanism and a process to inculcate feedback from various stakeholders would be established so that existing Government policies and schemes can be modified and new schemes created as per customers’ feedback.
Outcome 2: High awareness regarding all Government Schemes/Services
Target 3: More than 70% of Customers aware of the e-Government program: An integral element of the implementation of the strategy would be a high decibel marketing and awareness campaign at the federal as well as regional levels to create awareness regarding the e-Government program and the benefits of availing e-Services. E.g. The customers need not travel to Addis Ababa or any other regional centre to seek information and services – such facilities would be made available within their immediate community. This will not only present the government in positive light as working towards the benefits of the customers but will also facilitate in higher take-up of new channels.
Linkage to National ICT Policy Goal: To ensure access to ICT by Ethiopia’s rural population.( It is also linked to Vision of Improved Service Delivery across different Channels)
Element of Vision: Effective Governance
Outcome 3: Improved turnaround time for service delivery
Target 4 – At least 30% improvement on Government Transformation Index PricewaterhouseCoopers
Page 27Confidential
Development of e-Government Strategy and Implementation PlanInception Report
Outcomes and Targets Description
(GTI) from 2010 to 2015: Government Transformation Index (GTI) helps to assess impact of the e-Government program on Government based on parameters such transparency, accountability, responsiveness and quality of delivery of services. It aims to measure the beneficial impact of projects in transforming government practices at a program level. This tool will also build a review mechanism to assess the impact of implementation of e-Government strategy in enhancing the effectiveness of the government. The target is to improve government efficiency by at least 30% from 2010 to 2015.
Outcome 4: Joined-Up Government
Target 5- Integration of Ministries /Agencies through common applications, standards and policies: The e-Government Strategy mandates the implementation of common applications, standards and policies to improve government efficiency and costs through facilitation of better coordination amongst the government departments. Towards this end, two key imperatives would be:
Core projects which include, Data Centre, Woreda Network, National Dataset, Payment Gateway, Enterprise Architecture and PKI would be implemented to provide the requisite foundational infrastructure upon which service enablement can be accomplished
Along with the core infrastructure, common applications need to be made available across the Ministries and Agencies to enable smooth functioning and provide focus on implementation of the priority projects by reducing the effort required. The common applications would also facilitate collaboration and consistency across common processes such as procurement, HR management, Financial Management etc.
Outcome 5: Customer friendly and Accountable Government
Target 6 – Capacity building of all officials on IT and Customer behaviour: Capacity building is an integral part of the e-Government strategy and is envisaged to be a tool for change management, imparting relevant IT skills to government personnel and to re-orient the customer facing staff in terms of customer etiquette and quality of service. By 2015, all the officials should have received training relevant to their job which will enable them to discharge their responsibilities in a more effective and efficient manner.
Linkage to National ICT Policy Goals:
Establish highly skilled ICT human resource base for transforming Ethiopia into a knowledge- and information-based society and economy.( Through Capacity Building Initiatives detailed in further sections)
Promote infrastructure development including physical and telecommunications and communications infrastructure as a backbone for ICT development.( Core Projects and Common Applications which will help in delivery of public services)
PricewaterhouseCoopers
Page 28Confidential
Development of e-Government Strategy and Implementation PlanInception Report
Outcomes and Targets Description
Element of Vision: Improved Service Delivery
Outcome 6: All services accessible within the community
Target 7 - Electronic enablement of 219 services: Electronic enablement of the 211 service ‘transactions’ to enable services across Life Cycle Events for businesses and citizens/residents. All services that can be provisioned electronically will be made available through alternate channels. Procedural information and support for services that are not amenable for electronic delivery will be provisioned through alternate channels.
Additionally, a Grievance Redressal System will be developed during the first year of the program, i.e. 2011. Procedural information about all the services that may not be amenable for electronic delivery will also be made available through electronic channels. (Definition of Life Cycle Events and transactions has been provided in Annexure I).
Target 8 – All the 4 Channels established with more than 50% uptake for alternate service delivery channels: The customers should be able to interact with the government at a time and place of their liking. To facilitate this endeavour, the access to government services and information would be provisioned through internet, m-Government and contact centre so that citizens can connect with government 24*7. Further, common services centres would be leveraged to provide all government services within the community. All the channels are envisaged to be functional by 2012 albeit with different number and maturity of services. All identified services to the maximum possible depth to be provided through all channels by 2015. Uptake of services through alternate channels is the best indicator to test the success of these channels and therefore all efforts would be made to ensure that at least 50% of the transactions with the government are conducted through the alternate channels. This would reflect the efficacy of reaching out to all customers and the effectiveness of the alternate channels created as part of the strategy.
Outcome 7: Improvement in Customer Satisfaction
Target 9 – 60% customer satisfaction: The Customer Satisfaction Index would use mechanisms like e-Poll, Feedbacks, e-Consultation, surveys, etc, to assess customer satisfaction levels with delivery of government services. Comprehensive reviews will be undertaken to take corrective measures wherever satisfaction rating falls below 50% of all customers. The target is to achieve 60% customer satisfaction rate by 2015.
Target 10 - Published Customer Charters for all services provided by government organizations by 2015: Customer charter is a published document
PricewaterhouseCoopers
Page 29Confidential
Development of e-Government Strategy and Implementation PlanInception Report
Outcomes and Targets Description
that announces the service levels such as the turnaround time for service, escalation mechanism in case of unsatisfactory quality of service, requirements for availing services etc. The target is to put in place a Customer Charter in place for all services provided to citizens, businesses, government employees and visitors. This is likely to increase customer satisfaction levels due to higher transparency and accountability in provisioning services.
Linkage to National ICT Policy Goals:
Deliver efficient and effective public and civil service to all citizens.( Through Multiple Channels, enablement of e-Services and customer charters for transparency)
Ensure that ICT as an integral part of education and training at all levels.(Education is one of the 12 Priority Projects being implemented as part of the Strategy)
Modernize and expand improved health services coverage using ICT. (Health is one of the 12 Priority Projects being implemented as part of the Strategy)
Modernize agriculture and radically increase output and productivity. (Agriculture is one of the 12 Priority Projects being implemented as part of the Strategy)
Element of Vision: Socio-Economic Growth
Outcome 8: Improve Business Climate
Target 11 – Amongst top 75 in Doing Business rankings of World Bank for ease of doing business in the country (Ranked 116 in 2009): Doing Business is an annual report investigating the regulations that enhance business activity and those that constrain it. It presents quantitative indicators on business regulations and the protection of property rights that can be compared across 181 economies. The delivery of services through alternate channels is likely to simplify business processes and reduce the cost of doing business and compliance with regulations.
Outcome 9: Growth of ICT entrepreneurship/Industry
Target 12 – Investment of > 10% of Budget of e-Government Program through PPP: Experience of other countries illustrates that a number of industries such as banking, education, Information Technology, Telecommunication etc. get positively impacted due to large scale e-Government implementations. The players in these sectors invest not only as part of their Corporate Social Responsibility (CSR) initiatives but also to create goodwill and awareness regarding their products through advertisement and association with the e-Government program. It is envisaged that such partnerships will facilitate in accrual of 10% of the total funds required for the implementation of the e-Government strategy.
Linkage to National ICT Policy Goal:
PricewaterhouseCoopers
Page 30Confidential
Development of e-Government Strategy and Implementation PlanInception Report
Outcomes and Targets Description
Develop an efficient and globally competitive ICT industry( Through Private sector Involvement and Growth)
Ensure Ethiopia’s effective participation in national, regional and global trade( Trade portal is one of the 12 Priority Projects being implemented as part of the Strategy)
PricewaterhouseCoopers
Page 31Confidential
Development of e-Government Strategy and Implementation PlanInception Report
II. Strategic Dimensions
In order to achieve the above outcomes and targets leading to the realization of the vision, strategic components and an action plan for the implementation of these strategic dimensions has been defined. The figure below presents the key Strategic dimensions:
Figure 3: Key Strategic Dimensions
As can be seen from the figure above, the key dimension of the e-Government strategy for Ethiopia are Services enablement through the implementation of 12 Agency priority projects, delivery of services through 4 alternate channels of services delivery and the enablers which will facilitate the creation of a sustainable ecosystem for the implementation of the e-Government strategy. All these dimensions are shrouded in the Governance structure to highlight the key role that the governance mechanism for the e-Government program is envisaged to play in ensuring that each of the strategic dimensions gets implemented in a way that furthers the overall implementation of the e-Government program. The strategic components are explained as follows:
Strategic Dimension 1 -Service enablement
PricewaterhouseCoopers
Page 32Confidential
Development of e-Government Strategy and Implementation PlanInception Report
1. Agency Priority Projects - 219 services through implementation of 12 Agency Priority
Projects that will facilitate service enablement of these services based on lifecycle based service requirements of customers. The key priority projects are mentioned in brief below:
i. Agriculture Services - Given this overwhelming significance of Agriculture in the Ethiopian economy, it is imperative to leverage ICT to facilitate services provided for the agricultural sector. This project would be undertaken under the ownership of the Ministry of Agriculture and Rural Development.
ii. Benefits Management - Benefits are offered to Citizens by various agencies and departments. To improve satisfaction with the services, it is essential that the customers are able to get information about their eligibility for different schemes and file a single request to avail all the benefits. Such a common interface also enables better management and improved service levels of the services offered by such benefit schemes. This project would be undertaken under the ownership of the Social Security Agency or Ministry of Labour & Social Affairs and would also involve Addis Ababa city administration.
iii. Education - Education is one of the priority areas for the development of Ethiopia. Education related services have huge potential for leveraging ICT. The field of education is apt for initiating such a project as it has a direct impact on the future development of the country. This project would be undertaken under the ownership of Ministry of Education.
iv. E-Health - Health is also one of the focus areas for the government of Ethiopia. It is imperative that the field of health is IT enabled not only to improve the efficiency and the effectiveness of the Hospitals and labs but also to build a base for gaining access to future advancements in medical science. The field of health is also a prime candidate for leveraging ICT for better service delivery to the citizens of Ethiopia. This project would be undertaken under the ownership of Ministry of Health.
v. Trade Portal - The portal would serve the business community’s need for information and services such as business registration, licensing, loans, penalties etc. Also investment related regulations and processes would be facilitated through the G2B Portal. The portal is also a medium of interaction and feedback on Government policies and regulations. It is imperative for the G2B space to be e-enabled for sustained economic growth of Ethiopia. This project would be undertaken under the ownership of Ministry of Trade and Investment.
vi. Employment - Generation of adequate employment opportunities is imperative for the prosperity of Ethiopia. This project envisages facilitating the same through better information dissemination amongst the unemployed and by providing a forum for the companies and the individuals to interact. This will also help the businesses find the right people. This project would be undertaken under the ownership of the Ministry of Labour.
vii. Transport - This project would facilitate the electronic enablement of the services provided by the Ministry of Transport and Communication and the Transport Authority. Most of these services such as the services related to Drivers License and Registration of vehicles are high volume, high impact services that would improve
PricewaterhouseCoopers
Page 33Confidential
Development of e-Government Strategy and Implementation PlanInception Report
the service experience of a large number of people. This project would be undertaken under the ownership of the Ministry of Transport and Communications.
viii. Tourism - The government is keen to leverage the same to enhance the contribution of the tourism sector in the national economy. This priority project is envisaged to be a facilitator towards this end. This project would be undertaken under the ownership of the Ministry of Culture and Tourism and participation of Ministry of Foreign Affairs.
ix. Tax - The Government of Ethiopia has launched an ambitious government transformation plan aiming at double digit growth of the economy for the next 5 years. In order to support such a voracious growth, a huge number of resources need to be mobilized. In order to generate these resources, it is imperative to ensure that the cost of compliance to tax system in Ethiopia is lowered so that tax
collections may be enhanced. This project aims to facilitate the same. This project would be undertaken under the ownership of the Revenue and Customs Authority.
x. e-Court - e-Court project envisages leveraging ICT to facilitate the delivery of services provided by the judiciary. This project would be undertaken under the ownership of the Ministry of Justice. Services of the Federal Supreme court would also be covered under the project.
xi. Municipalities - This project envisages leveraging ICT to facilitate the delivery of services provided by the Municipalities. This project would be undertaken under the ownership of the Addis Ababa City Administration.
xii. Passport & Visa – This project envisages automation of services relating to issuance of passports and visa and the services would include application/renewal /replacement of passport, visa processing and ID Card issuance for Foreign Nationals. The project would be undertaken by Ministry of Foreign Affairs
PricewaterhouseCoopers
Page 34Confidential
The electronic enablement of services will be undertaken in a phase wise manner. It is expected that while all information services, grievance redressal mechanism and most information services will be provided electronically by the end of year 1 (2011), transactional services will be enabled progressively over the course of next 5 years (2015).
Development of e-Government Strategy and Implementation PlanInception Report
The e-Services enablement plan for 219 services through the priority projects is provided below in figure
Figure 4: e-Service enablement Plan
Agency Priority Projects Year 1 Year 2 Year 3 Year 4 Year 5 Total
Agricultural Services
15
296 8
Benefits Management system
2
53
Education
5
133 5
Health
4
1410
e-Trade
6
185 7
Employment
3
712
Transport
6
148
Tourism
4
142 4 4
Tax
7
136
e-Court 114 7
e-Municipality
25
6213 19 5
e-Passport
2
114 5
Yearly Services 35 73 64 30 9
Total Services ( 79 Informational,140 Transactional) 219
Transactional
Informational
PricewaterhouseCoopers
Page 35Confidential
Development of e-Government Strategy and Implementation PlanInception Report
2. Common Applications: Common applications need to be made available across the
Ministries and Agencies to enable smooth functioning and provide focus on implementation of the priority projects by reducing the effort required. The common applications would also facilitate collaboration and consistency across common processes such as procurement, HR management, Financial Management etc. The details of the common applications include
i. e-Procurement: Provide businesses and ministries with common platform to transact with features such as Demand aggregation, catalogue based procurement, dynamic pricing engine, etc
ii. HRMS - Government wide HRMS application to handle all functions related to leave, transfer, payroll, recruitment etc.
iii. E-office- To eliminate the paper-based interactions even within the government across different agencies by using a single solution
iv. FMIS - Enhancement of the existing Integrated Budget and Expenditure System (IBEX) addressing the core functions of public financial management
v. Email Management System: Email can be used as a very effective medium for the inter-office and intra-office communication. Since the email system will be common across the departments, the common system can be used across with the standardization in email addresses.
The implementation plan for the common applications is provided below:
Table 3: Implementation Plan for common applications
Yr. v/s Project
Implementation plan
Year 1 Year 2 Year 3 Year 4 Year 5
e-Procurement
HRMS
e-Office
FMIS
PricewaterhouseCoopers
Page 36Confidential
Development of e-Government Strategy and Implementation PlanInception Report
3. Core Projects: The core projects, as mentioned are proposed to be implemented in the
1st three years of implementation of the strategy implementation, considering the fact that they would be building blocks/ or the facilitators for the priority project implementation.
I. National Data set: Provisioning a national level data set of commonly used data elements across ministries, that can be used by all inter-ministerial applications as well as channels of delivery (national portal, mobile portal, CSC, NCC etc.) for delivering eServices
II. National Enterprise Service Bus (NESB): Provisioning a platform for seamless integration of ministry / agency applications and database at the back end; integrating all front end channels to deliver eServices
III. National Integrated Authentication Framework(NIAF): Provisioning of a unique identity based login to individuals for accessing the various electronic channels of government (National Portal, Mobile Portal, Common Service Centre (CSC) and National Contact Centre (NCC) & other ministry applications
IV. National Payment Gateway: Provisioning of a national payment gateway for Ethiopia to enable all modes of electronic payments to be transacted through all the electronic channels of delivery
V. PKI : Provisioning of PKI based identification, integrity and non-repudiation for online transactions related to the e-Government projects in Ethiopia
VI. Woreda Network: Provisioning of high bandwidth connectivity between ministries and agencies for sharing data, voice and video communication throughout the country
VII. National data Centre: It is proposed that the Ethiopian National Data Centre (ENDC) would consolidate services, applications and infrastructure to provide efficient electronic delivery of G2G, G2C and G2B services. ENDC infrastructure shall provide adequate space to house ICT assets of various departments and Government agencies within the country in an environment that meets the need for reliability, availability, scalability, security and serviceability.
VIII. National enterprise Architecture: Unified architecture adoption across ministries enabling better integration of ministry applications
The implementation plan for the common applications is provided in the table below:
Table 4: Implementation Plan for Core Projects
Yr. v/s Project
Implementation plan
Year 1 Year 2 Year 3 Year 4 Year 5
National Data SetNational Enterprise Service Bus
National Integrated Authentication Framework
PricewaterhouseCoopers
Page 37Confidential
Development of e-Government Strategy and Implementation PlanInception Report
National Payment Gateway
Public Key Infrastructure
Enterprise Architecture* WoredaNet and National data Centre is already being implemented by MINISTRY OF COMMUNICATIONS & IT
Strategic Dimension 2- Channel Enablement:
Implementation of the following four service delivery channel enhancement projects that will enable the customers to demand and avail services as per their choice and convenience:
1. e-Government portal where customers can use internet to request and avail services, search information, make payments, etc the national e-Government portal of Ethiopia – www.ethiopia.gov.et needs to be updated and enriched with the electronic enablement of 219 services over the next 5 years. Currently Ethiopia’s e-Portal is managed in-house. Based on the current assessment of the existing portal and websites of various departments, it is suggested that the government continue with the “in-house portal” model. However, the portal must be enhanced to be able to provide eServices. Additionally, the Government must consider options to allow private sector participation in the provision of related value-added services through the e-Government portal.
2. Phone (Call Center) where customers can call up to request services and information and access the same through call center agents and ‘Interactive Voice Response’ technologies. Government of Ethiopia has set up an in-house government call center. Since the exiting set-up is very basic and not a full-fledged call center, it is suggested that as part of the e-Government strategy implementation, the government establish an “Outsourced Call Center” to facilitate e-Services. It is planned to provide around 77 Informational and 40 transactional services through the call centre channel.
3. Mobile Gateway where customers can request services and information through mobile phones and hand-held digital personal assistants. The departments can send customers regular alerts through SMS. It is recommended that the Government of Ethiopia should review options of Outsourced Mobile gateway and ASP model (vendor managed) gateway for its services as current number of transactions may not warrant a dedicated in-house mobile gateway. It is planned to provide around 77 Informational and 40 transactional services through the Mobile channel.
PricewaterhouseCoopers
Page 38Confidential
Development of e-Government Strategy and Implementation PlanInception Report
4. Common Service Centers (CSC) where services like Information dissemination,
acceptance of service requests and delivery of services is provided to the customers at a single point of service delivery. It is recommended that the 92 existing ICT Community Centres and the proposed 42 Unified Billing Centres are leveraged as CSCs for offering government services. In addition it is proposed to set-up around 800 centres (equal to approx. number of Woredas) on a PPP model. These centres would provide access to the 219 services – across the country.
PricewaterhouseCoopers
Page 39Confidential
Given the high cost of ownership of internet, PC and mobiles and the relatively low ICT literacy in Ethiopia, Common Services Centers are expected to be the primary vehicles of electronic services delivery during the initial part of the implementation of the e-Government Strategy. Mobile channel is also expected to become a key channel for delivery of services over the next 5 years if the projection of the number of subscribers of mobiles in Ethiopia were to be realized.
Development of e-Government Strategy and Implementation PlanInception Report
The implementation for e-Services through the channels is provided below
Table 5: e-Services Implementation Plan for the Channels
Channel Year I Year II Year III Year IV Year V
Portal 35 73 64 30 9
ContactCentre
35 42 20 20
Mobile 35 42 20 20
ICT Centres
35 73 64 30 9
Strategic Dimension 3- Enablers:
It is essential that the various components of the e-Government strategy are supported by the following Five key enablers to assure successful and timely implementation of the e-Government strategy and ensure the sustainability of the initiatives:
Common standards and policies would enable an integrated and connected Government and facilitate standardization and efficiency across all key elements of the e-Government Components
Capacity building activities such as training, career planning and change management would ensure the availability of personnel resources and skill sets required to achieve the strategy
Marketing and awareness campaigns are key enablers in generating awareness and communicating with external and internal stakeholders to generate sufficient demand for the electronic services and reduce possible resistance to e-Government
Monitoring and evaluation would enable the High Committee/Technical Committee, through the project office, to monitor progress, customer satisfaction and government transformation which would be important in assessing if the desired outcomes are being achieved
Public Private Partnership models facilitate private sector participation for effective and efficient delivery of services
Overall Cost Estimates: Budgetary estimates for the implementation of the Strategy over a period of five years are approx. 3328.18 Mil. Birr or approx. 201.46 Mil USD. Details are provided in section 8 of the Report.
Overall Implementation Plan: The E Government Strategy along with all its components is to be implemented and monitored and assessed over a period of five years.
The components essentially comprise of the core projects – which are the infrastructure projects, the identified twelve priority projects and the Enablers. The enablers would
PricewaterhouseCoopers
Page 40Confidential
Development of e-Government Strategy and Implementation PlanInception Report
actually be implemented over a period of 1 year – but they will be used on a recurring basis for the entire five year period.
The brief of the proposed overall implementation plan is provided below. The details of the implementation are in chapter 7.
Table 6: Overall Implementation Plan
S No. Project Implementation Plan
Year 1 Year 2 Year 3 Year 4Year
5
Core Projects
1 National Data Set
2National Enterprise Service Bus
3National Integrated Authentication Framework
4 National Payment Gateway
5 Public Key Infrastructure
6 Enterprise Architecture
Priority Projects
1 Agriculture services
2Benefits Management System
3 Education
4 Ehealth
5 G2B Portal
6 Employment
7 Transport
8 Tourism
9 Tax
10 Ecourts
11 Municipality
12 Passport & Visa
Enablers
1Marketing & Awareness Campaign
2 Capacity Building
3 Monitoring & Evaluation
4 Standards & Policies
Common Applications
E-Procurement
HRMS
E-OfficeFMIS
PricewaterhouseCoopers
Page 41Confidential
Development of e-Government Strategy and Implementation PlanInception Report
E Mail
These components of the e-Government Strategy must be looked at in totality and the dynamic nature of the same must be acknowledged. Towards this end, the Governance Structure put forward in this document would provide an institutional mechanism responsible for coordinating and monitoring the implementation of the strategy and ensuring benefit realization. The following chapters detail out the recommendations for the Governance Structure and implementation of these strategic dimensions.
PricewaterhouseCoopers
Page 42Confidential
Development of e-Government Strategy and Implementation PlanInception Report
PricewaterhouseCoopers
Page 43Confidential
Section 3 – GOVERNANCE STRUCTURE
Development of e-Government Strategy and Implementation PlanInception Report
III. Governance Structure
This section describes the Governance Structure that should be established to oversee and facilitate the Ethiopian e-Government Strategy implementation process. Some of the key factors that have been considered while drafting the governance structure are:
Ownership and Accountability for success of implementation of the e-Government program needs to be established;
Focus on realization of the strategic dimensions identified in the strategy needs to be maintained;
Ethiopian e-Government Strategy is a Government wide strategy that cuts across Ethiopia’s different Ministries/Agencies, it is not meant for any specific Ministry/Agency or sector. Therefore, a forum needs to be established to facilitate coordination amongst all stakeholders; and
Government priorities, frameworks, processes and organization structures.
Based on the Assessment done the following gaps have been identified:
Lack of a holistic coordination and cooperation across the Government for properly developing and utilizing IT;
IT organization structures, roles, and responsibilities are not properly defined nor approved, resulting in IT organizations in the Government Entity with varying levels of maturity in terms of design and resourcing;
Lack of a clear program and project management framework and tools to ensure all e-Government initiatives apply the same controls and quality measures and proper planning is in place for IT development;
Lack of knowledge sharing and resources sharing which can speed the process of IT implementations in common domains; and
IT expenditure is not recognized among the Ministries/Agencies budget, in addition, there is no allocation of a central fund to support central IT projects implementation.
I. Drivers for the Governance StructureTo guide the program towards achieving its objectives, the development of the program governance should take into consideration the nature of the program and the surrounding circumstances and factors that will influence and drive the program in the long and short terms. The Ethiopia e-Government Strategy Governance Structure drivers include the following:
The e-Government Strategy is for the Government as a whole; A large program with many projects needs to be coordinated and managed; A high number of stakeholders in different locations to be managed; A proper level of trust and confidence around the program need to be established; Standardization of approach and use of standards need to be enforced; Interdependency and conflicts need to be managed; Continuous monitoring and course correction is required; Ongoing alignment to business objectives is mandatory; Funding and spending critical decisions need to be tackled timely and properly; and A long term investment that require proper controls.
PricewaterhouseCoopers
Page 44Confidential
Development of e-Government Strategy and Implementation PlanInception Report
II. Governance Structure: Options and Recommendations
For the successful implementation of e-Government Strategy, the owners for various functions as well as their relationship with each other needs to be defined clearly. The various roles envisaged and the options available are analyzed in the following section. Various areas considered are as follows:
Overall sponsorship of program Need for High Committee Need for the Technical Committee PMO as part of Ministry of Communications & IT Ownership of initiatives in entities
Overall Sponsorship of Program
Considering the scope of e-Government Strategy and its impact, it is imperative that the ultimate ownership of project rests with a high level authority. The sponsor of program will own the functions related to funding and strategic directions. In the table below the options of having Council of Ministers under the Prime Minister or a Board under the Council of Ministers as program sponsor has been analyzed.
Table 7: Options for sponsorship
Options Advantages Disadvantages
Council of Ministers under the Prime Minister
• Highest ownership in policy level decisions
• Establishment of the identity and importance of the program
• Easy co-ordination between Ministries/Agencies
• Quicker conflict resolution
• Sustainability of program will be ensured
• Decisions may be delayed
• Prime Minister may not be able to regularly monitor the progress of the Program
A Board under the Council of Ministers as the sponsor
• Quick decision making • Multiple stakeholders in board with different roles
• No ownership at individual level
• Insufficient level of support
Need for a High Committee
The best governance practices globally recommend the formation of a High Committee for large scale IT Strategy implementation. The role of this committee will be focused on providing guidance for the strategic directions and coordinating at the highest level. The available options for constituting the High Committee are analyzed in the table provided overleaf:
PricewaterhouseCoopers
Page 45Confidential
Development of e-Government Strategy and Implementation PlanInception Report
Table 8: High Committee Assessment
Options Advantages Disadvantages
High Committee chaired by Minister of Communications & IT
• High visibility of program
• Co-ordination and conflict resolution mechanism amongst Ministries
• Program could become a part of high priority agenda of the Council of Ministers
• The legal and policy level issues can be managed
• Members may not be available to meet too often which may result in delays in decision making process
No High Committee –Recommendations made by Technical Committee
• Availability of members to meet and discuss
• Authority to enforce decisions across the Government is weak
• Decisions on Ministry level have to go through a higher level (the Minister)
Need for a Technical Committee
The best practices globally recommend the formation of a Technical Committee for Strategy implementation. The role of this committee will be to coordinate, monitor the progress and establish standards for implementation. The advantages and disadvantages of constituting a Technical Committee are placed in the table below:
Table 9: Technical Committee
Options Advantages Disadvantages
Technical Committee chaired by Representative – Ministry of Communication & IT
• Co-ordination between Ministries
• Regular monitoring of the project progress
• Faster resolution of technical issues
• The organization structure may have too many committees and delays in decision making process
• The Technical Committee is not empowered to undertake policy decisions
PricewaterhouseCoopers
Page 46Confidential
Development of e-Government Strategy and Implementation PlanInception Report
Project Management Office (PMO) under e-Government Directorate of Ministry of Communications & IT or separate Directorate or separate Entity
In the new structure, the role of the Project Management Office (PMO) is focused on monitoring, compliance and supporting the central as well as entity level initiatives. PMO will also be playing a critical role in the capacity building and knowledge management across various Ministries/Agencies. The option of having the PMO as part of Ministry of Communications & IT or as an independent entity was evaluated, considering the scope of PMO.
Table 10: PMO Options
Options Advantages Disadvantages
PMO as part of e-Government Directorate Ministry of Communications & IT
• High maturity level as organization
• Office infrastructure is in place
• Availability of skilled manpower
• Ministry of Communications & IT will enable a structured reporting mechanism & process
• All conflicts related to IT implementation can be resolved easily
• The implementation will require the ownership from different Ministries/Agencies and co-operation will require continuous & efficient co-ordination
PMO as a Separate Directorate Ministry of Communications & IT
• Office infrastructure is in place
• Dedicated team to implement the e-Government Strategy
• All conflicts related to IT implementation can be resolved easily
• Recruitment of all the officials of the Directorate needs to be dome
• Coordination with the e-Government Directorate with conflicting roles
• Reporting structure needs to be established
PMO as an independent Entity under independent implementation agency – like erstwhile EICTDA
• PMO will be Entity-independent
• PMO need to co-ordinate with various sub-committees within implementation agency
• PMO will need empowerment and support from Government officials
• A new Entity that will need to undergo different levels of maturity to reach the right shape
PricewaterhouseCoopers
Page 47Confidential
Development of e-Government Strategy and Implementation PlanInception Report
Options Advantages Disadvantages
• The new reporting structure needs to be carefully designed and approved
* Please note that the role of implementation agency for e-Government implementation within MoC&IT may be finalized after structure of the MoC&IT is finalized.
Ownership of IT initiatives in entity
Implementation of all the central initiatives will be owned by the implementation agency but the ownership of initiatives at the Ministries’ level needs to be clearly defined to avoid any conflict in scope and responsibilities. The options available in this area are analyzed below:
Table 11: Ownership of IT Initiatives
Options Advantages Disadvantages
Implementation Agency owns the implementation of Ministries/Agencies initiatives
• Central control on the implementation
• Easy to enforce standards and procedures
• Lack of ownership by Ministries/Agencies
• No domain expertise, as a result providing direction will be difficult
• Funding will be done by entity so ownership can be questioned
Ministries/Agencies owns the implementation
• Faster implementation and better control
• Scope of project can be defined considering the requirements of the entity
• Sustainability resulting from ownership
• Compliance with standards and procedures may be impacted
The recommendations based on analysis of the various options are as follows
o The Council of Ministers headed by Prime Minister should be the Program sponsor o High Committee under the Minister of Communications & IT is needed in the overall
structure for effective implementation of the strategyo Technical Committee is needed in the overall structure o PMO will be under e-Government Directorate of Ministry of Communications & ITo Ministry/Agency initiatives will be owned by the respective Ministries/Agencies and
will be supported by the PMO while core and common initiatives will be owned by the Ministry of Communications & IT
PricewaterhouseCoopers
Page 48Confidential
Development of e-Government Strategy and Implementation PlanInception Report
III. Recommended Governance StructureIn light of the recommendations above, envisaged governance structure is placed below:
Figure 5: Recommended Structure
As shown in the figure above, the ultimate responsibility for the implementation of the Ethiopian e-Government program lies with the Council of Ministers under the Ethiopian Prime Minister. The High Committee will be assisted by the PMO in Ministry of Communications & IT for monitoring, coordinating and directly following up the execution of IT initiatives. Ministries and other Government Agencies are the owners of their respective core and cross Government projects and will get the support for delivering these projects from the PMO.
In addition, Ministries and other Government Agencies are responsible for developing their vertical IT Strategies and implementation plans in coordination and under the direct supervision of the Technical Committee, in line with the e-Government Strategy and are responsible for deploying their Ministry/Agencies specific IT vertical projects. The
PricewaterhouseCoopers
Page 49Confidential
Development of e-Government Strategy and Implementation PlanInception Report
Technical Committee will report on the progress and the issues of the strategy implementation to the High Committee.
Progress on vertical plans execution will be reported to the PMO to ensure alignment amongst all e-Government initiatives. All work initiated and conducted by Ministries/Agencies should be in compliance with the approved Strategic Directions. Any deviation – during implementation – from the directions provided in the Strategy document should be pre approved by the High Committee.
Description of the Entities presented in the Governance Structure
1. Overall Sponsor: The e-Government Strategy Sponsor is the council of Ministers under his Excellency, the Prime Minister. Ownership at this level is mandatory to ensure that the program receives sufficient support, which is necessary to ensure the success of the Program taking into consideration the size and nature of the change to take place. It is envisaged that the Prime minister as the Program owner will sponsor the program across the Government, push for change and resources, publicly take “ownership” of the projects and commit his time on a sustained basis.
2. The High committee chaired by Minister of Communications & IT will have the following members:
1. The Minister of Finance and Economic Development2. The Minister of Labor and Social Affairs3. The Minister of Transport 4. The Minister of Agriculture 5. The Minister of Education 6. The Minister of Trade 7. The Minister of Industry 8. The Minister of Foreign Affairs9. The Minister of Works and Urban Development10. The Minister of Justice11. The Minister of Civil Services12. Representative(s), PMO13. DG, Social Security Agency
The High Committee would be responsible to:
Agree on priorities among Program initiatives; Lead the implementation of the e-Government Strategy across the Government
covering all tracks defined within the Strategy and the implementation Roadmap. This includes submitting strategies for final approval by the High Committee, initiatives and projects approval and the monitoring and control activities;
Harmonize the Strategy implementation across all the components and manage interdependencies; and
Specify required funding and administer the allocated funds as part of Program management activities.
PricewaterhouseCoopers
Page 50Confidential
Development of e-Government Strategy and Implementation PlanInception Report
3. The Technical Committee is responsible for the Program implementation
management through initiatives implementation management and provides Program integration, interdependency management and delivery assurance. The Technical Committee will report to the High Committee and will contain IT heads from the following Ministries/Agencies:1. Ministry of Minister of Communications & IT2. Ministry of Finance and Economic Development3. Ministry of Labor and Social Affairs4. Ministry of Transport 5. Ministry of Education 6. Ministry of Agriculture7. Ministry of Education 8. Ministry of Trade 9. Ministry of Industry10. Ministry of Foreign Affairs11. Ministry of Works and Urban Development12. Ministry of Justice13. Ministry of Civil Service14. Social Security Agency15. Head of PMO
The Technical Committee will be responsible for the following:
Identify technical assistance requirement at project implementation units; Assist in developing program level training schedule for project teams, general IT
skills, technology etc ; Identify competent technical as well as administrative resources (within the
Government and externally) for specific requirements of stakeholders; Lead the development of IT related policies and standards and submit drafts for
High Committee sign-off; Lead the development of IT related regulations and submit drafts for High
Committee sign-off; Lead the discussions with the private sector organization; and Support resolving conflicts whenever they arise and escalate conflicts to High
Committee whenever resolution is not possible.
4. Ministry of Communications & IT will own the implementation of e-Government
Strategy with support from Programme Governing Body or PMO. Some of the important functions of Ministry of Communications & IT and the PMO are as follows:
Specify required funding and administer the allocated funds as part of e-Government Strategy activities;
Lead the development of IT related policies and standards and submit drafts for High Committee sign-off;
Lead the development of IT related regulations and submit drafts for High Committee sign-off
PricewaterhouseCoopers
Page 51Confidential
Development of e-Government Strategy and Implementation PlanInception Report
Lead the discussions with the private sector organizations; and Facilitate implementation of the IT initiatives across the Ministries/Agencies.
5. The Project Management Office (PMO) will be part of the E-Government Directorate of Ministry of Communications & IT and will support the e-Government Strategy implementation through monitoring projects delivery, controlling the relation with vendors, managing the procurement process, ensuring compliance with policies and standards, auditing projects at hand over, knowledge management and sharing for areas related to project management. The PMO will play the following roles: Monitoring the implementation of the e-Government Program on the different
aspects (technical, administrative and financial); Project Addition/Deletion Approval Supporting with evaluating requests received from the different Ministries/Agencies
for implementations, and Supporting projects execution tasks through the identification and allocation of required resources; and
Knowledge sharing for experiences gained through executing the different Program components
Procurement and contracting process management.
The organization structure of the PMO (described in diagram in next page) was developed based on the above mandate, where the following key departments will have the core teams tasked to deliver listed roles:
Project Coordination Knowledge Management Appraisal ITSG (IT Services Group) Marketing & Awareness Monitoring & Evaluation Cadre Control
The core teams will be supported by the following support teams which will report to the respective departments in the MoC&IT
Financial Control Procurement
The PMO will contain a pool of resources that can be assigned different tasks depending on work load, projects nature and projects level of maturity. Accordingly, one team member can play several roles that can be of monitoring, support, and knowledge or procurement nature. The details regarding PMO Staffing requirements have been provided in Annexure II. The recommended structure for the Project Management Office (PMO) is provided in the figure below:
PricewaterhouseCoopers
Page 52Confidential
Development of e-Government Strategy and Implementation PlanInception Report
Figure 6: Project Management Office (PMO) Structure
Core Team of PMO
The details of the Core team of the PMO are provided in the following sections:
Project Co-ordination Team
This team will contain experts in infrastructure, applications, business process and information security and control requirements. It will be mainly responsible for the following:
1. Liaise with the implementing Ministries/Agencies closely and provide necessary coordination in order to ensure the realization of the Program targets and to facilitate the integration of the projects outputs with the e-Government Strategy;
2. Manage and monitor the implementation of the Program by assisting the Ministries/Agencies and other stakeholders;
3. Gather and review work plans from implementing Ministries/Agencies, and monitor the implementation of the different tasks defined in the plan;
4. Periodically report projects’ progress to the Program Governance Board with detailed analysis of status and deliverables;
5. Review projects’ deliverables and ensure deliverables specifications and quality meet those agreed in the contract signed with the service or technology provider;
6. In addition to monitoring projects, the Project Coordination team will also be involved in reviewing service level agreements for maintenance and operation contracts to validate compliance versus agreed terms and conditions from technical perspective;
Knowledge Management Team
It is mandatory to apply the same standards on the different projects within the e-Government Strategy Program; this includes applying the same procedures, using the same
PricewaterhouseCoopers
Page 53Confidential
Development of e-Government Strategy and Implementation PlanInception Report
templates, and following the same controls. In addition, there will be similar implementations rolled out across the Government; the knowledge gained in one implementation will need to be shared among others.
The Knowledge Management team will be responsible for the following:
1. Develop knowledge management objectives and plan on annual basis
2. Ensure the same project management standards are applied across the e-Government Program
3. Define the broad contours of the Knowledge Management Portal to be developed as part of the Capacity Building Initiative.
4. Maintain a central database of references, templates, projects documentation and other details
5. Provide project managers in the different Ministries with access to the central database
6. Conduct awareness sessions on approved project management frameworks and standards for the different stakeholders
7. Ensure project managers provide proper documentation on their projects at project conclusion
Appraisal Team
To properly manage requests for implementations (and associate funding), all requests will be accompanied by a Detailed Project Report which will contain technical and financial information about the requested change. The Appraisal team will handle the evaluation of all received requests and will perform technical and financial reviews to ensure received requests are in line with the Strategy and within the approved budget allocations. The purpose of the technical review and the financial review are described below:
Technical Review
The technical review will target ensuring the following:
Alignment of project with the Strategy
No overlap with approved, core and common initiatives
A proper utilization of shared and central facilities
The scope of work is defined clearly
A proper functional description is in place
A proper technical description is in place
Potential risk identified for the initiative and risk mitigation plan.
Details about the dependency of initiative on other initiatives (core, common or Ministry/Agencies specific)
Post implementation support plan is described properly
Financial Review
Financial review activities target ensuring the following:
PricewaterhouseCoopers
Page 54Confidential
Development of e-Government Strategy and Implementation PlanInception Report
Details about the fund required with sufficient break down are included in the request
submitted by the Ministries
Financial analyses including CAPEX and TCO are covered in the request
Adherence with Procurement policy
Availability of funds
Identification of funding options/resources
ITSG (IT Services Group)
To support the different projects that are part of the Program, resources will be needed to perform project management, technical activities and administrative activities. The need for resources will be assessed on a case by case basis to ensure projects are neither over staffed nor under staffed. The ITSG Resources team will play the role of Capacity Balancing by identifying resource requirements and allocating necessary resources accordingly. The source of these resources can be contracting with third parties.
Option 1 – Ethiopia Internal Resources
The resources with required skills can be deployed for short term from MoC&IT or any other Ministries/Agencies. This will ensure a proper utilization of in-house capacity and will lead to the development of a pool of Government experts who are specialized in technical and functional domains. This option is the preferred option and will be more predominant once capacity has developed properly to meet the targets established under capacity building domain.
Option 2– External Resources
In the initial phase the mobilization of resources from within the Ethiopia will be a challenge, as a result experts can be hired from third parties. Consulting, outsourcing and managed services companies can be contracted to provide technical and project management experts. While mobilizing resources from external resources, it is important to have a system for knowledge transfer to support internal capacity building on the long term. The technical areas where experts will be needed can include; Database Administration and Management, Networking, Solutions Architectures and Integration, Software Development, Computer Hardware, Financial Analysis, Business Analysis and Re-engineering, and Organizational Development.
Option 3- Fresh graduates and interns
It’s very important to employ fresh graduates and interns for suitable supporting roles in various Directorates in Ministries. ITSG will co-ordinate the hiring of qualified resources from the institutes in region and will be taking care of mobilization to various Ministries. This will help in building the future capacity for various positions where consultants will be hired initially. Graduates in Computer Science/IT, Engineering, Finance, HR and Management will form the part of this pool of resources. ITSG team will organize annual campus visits as part of internship program to identify such resources.
The indicative structure of ITSG required at the Ministries/Agencies is provided in the figure below (The details regarding ITSG qualifications requirements have been provided in Annexure XV)
PricewaterhouseCoopers
Page 55Confidential
Development of e-Government Strategy and Implementation PlanInception Report
Figure 7: ITSG Structure
Capacity Balancer
Capacity Balancer role will be handled by the ITSG within the PMO who will play the expert role in supplementing the efforts of the project implementation teams of the initiatives on request.
For a proper execution of the strategy, technical and administrative resources should be available where and when needed. It is expected to have a lack of sufficient resources in all Ministries/Agencies especially at the early stages of the Program implementation. To ensure this gap is managed properly a “Capacity Balancer” – which is one of the main roles of the PMO – will support in allocating the right resources to support initiatives, these resources can be from within Strategy or through contracting with third parties. This would integrate seamlessly across the centre and Ministry/Agencies departments to ensure capacities exist within the implementation units to prepare/undertake initiatives.
The Program Governance Structure is designed to have a structured mechanism to assess individual Ministries capacities and their gaps and then devising the right intervention to help fill these gaps. This mechanism would supplement the Ministry/Agencies’ capacity and equip them to effectively prepare/undertake initiatives.
The Capacity Balancer would need to address both long term capacity creations such as CIO, IT Management skills within the Ministry, etc. It would address both long term requirements either by implanting CIO from existing organizations for longer duration as internal staff and creating skill sets for the Ministry/Agencies staff. Short term requirements could be addressed by hiring private organizations or individuals with the required skill sets.
The work of the Capacity Balancer is illustrated in the diagram below. For example, Ministry- A may have internal capabilities in project preparation and design but may not have the necessary know-how in Bid-Process Management, Budgeting or the resources for Project Management. In such cases, the Ministry/Agencies may approach the ITSG unit of the PMO, which would in-turn help the Ministry to identify and engage appropriate
PricewaterhouseCoopers
Page 56Confidential
Solution Design Expert
Project Management Expert
Project Design Expert
Standards and Policies Expert
PPP Expert
Project Coordinator
Development of e-Government Strategy and Implementation PlanInception Report
resources for a given period to initially undertake the project and simultaneously build the required capacities. Ministry on the other hand, is fully equipped to undertake a project and thus would see no significant advantage in requesting support from the PMO
Figure 8: Capacity Balancer
Monitoring & Evaluation Team
This team of the PMO will play a very important role – in terms of development & implementation of program monitoring tools, implementation of a Monitoring & Evaluation framework consisting of project progress tracking measures, benefits measurement and impact assessment. This team will also be responsible for implementation of Government Transformation Index (GTI) and Customer satisfaction index (CSI).
Marketing & Awareness Team
This team of the PMO will be responsible for all publicity, marketing and advertising activities, which will ensure that there is a wide awareness among all stakeholders about the program and accordingly the demand and uptake of the different services is increased.
Cadre Control
This is another important part of the PMO which will oversee the identification, deployment, progression and capacity building of a central pool of Government IT resources – who will play an important role in the implementation
Support Team
The details of the support team of PMO are provided in the following sections. The support teams will be reporting to the respective directorate/division of the MoC&IT, which will also decide the structure and number of resources of the teams.
PricewaterhouseCoopers
Page 57Confidential
Development of e-Government Strategy and Implementation PlanInception Report
Financial Control Team
As the implementation of Strategy will involve huge investments, the strategy budget need to be managed through a comprehensive fund tracking mechanism. The Financial Control team will be responsible for the following:
1. Monitor the financial status of the program and report any deviation from the approved budget;
2. Perform financial analysis as part of evaluating requests received for new projects from the different Ministries; and
3. Develop the estimates for the Program annual budget.
The Financial Control team will do ongoing periodic reviews of active projects and will also be involved in reviewing service level agreements for maintenance and operation contracts to validate compliance versus agreed terms and conditions from financial perspective.
Procurement Team
As the execution of the e-Government Program will involve large number of procurements in the form of services, hardware and software, central control over procurement is mandatory to properly control acquisitions and ensure the standards are applied consistently.
The Procurement team will handle the following tasks:
1. Manage the tendering cycle for core and common initiatives;
2. Prepare purchase orders of IT products like computers, servers, peripherals, networking and any hardware requirements; and
3. Monitor purchase orders, release of payments, stock entries, billings, deliveries, utilization certificates related to all IT products;
4. Estimate expenditure details and manage correspondence with suppliers and departments/organizations after orders placement;
5. Manage framework contracts; and
6. Maintain vendor’s short list.
The Procurement team will manage the Service Level Agreements (SLAs) with the different providers and will ensure the following:
SLAs are signed on time;
The terms within SLAs cover the required services;
The providers are complying with their respective SLAs; and
Compliance reviews are conducted by the Coordination team and the Financial Control team.
PricewaterhouseCoopers
Page 58Confidential
Development of e-Government Strategy and Implementation PlanInception Report
Temporary Capacity Sourcing Agencies
Since implementation of the Strategy would require experts from different domains as mentioned above, there is a need to have a Temporary capacity Sourcing Agencies who could provide resources with desired qualifications for a specified contract period. Human Resource Development, Capacity Building, Research and Consultancy Directorate of MoC&IT could be responsible for empanelment of such agencies and then procure resources based on the Ministerial/Agency project requirements.
IT Organization Structure at Ministry/Project Level
Each Ministry/Agency will have a dedicated IT department to manage the operations and support of the IT infrastructure and system implemented within the entity. Currently, the Ministry level IT department may not have requisite staff and skill set. The profile of the people, their experience and attitude are critical success factors for the successful implementation of IT initiatives. Given this, it is recommended that only experts in the respective domains be sourced. Leveraging expertise of resources from the private sector is a good option in this context. The strategy to have the best quality for a reasonable cost will be to hire people from the market in the initial phase, get the systems and processes in place. Simultaneously the senior government officials with sufficient experience and interest will be identified and trained over a period to take over their positions. This way, over a period of time, there will be systems and processes in place and people with the right skill-set to take the challenge of achieving the objectives.
Taking cognizance of the above as well as the gaps identified in the present mechanism during current state assessment of all Ministry/Agency level the recommended minimum composition of the Ministry level IT Department is given in the following figure
Figure 9: Ministry Level IT Organization Structure
Role of CIO/Head of Department
The key to the long term success of the e-Government Strategy lies in the creation of effective Information Technology Managers within the Government Ministries. While project implementation along with associated process improvements could be considered as a onetime activity, the continuous improvement in processes and technology is an activity for which capacities need to be created within the individual Ministries/Agencies.
PricewaterhouseCoopers
Page 59Confidential
Development of e-Government Strategy and Implementation PlanInception Report
International experience indicates that creation of CIOs has been extensively used by countries to sustain and increase the pace of IT development.
The first step towards creating such capabilities is to create an appropriate position with the identified responsibility of information management within the Government. Across the globe, this is being achieved through the role of the Chief Information Officers (CIO)
The governance structure proposed here briefly introduces the concept of CIOs. It is an important position and can play a significant role. This section highlights the concept and functioning of CIOs, in addition to describing the structures of IT departments within Ministries, the size of these departments will vary depending on Entity size and Entity level of dependency on information technology.
The primary role of the CIO/IT Head is to act as the IT manager of the Ministry. He or she would be the person responsible for Ministry IT strategy development and maintenance, further entity capacity building, sponsor of IT initiatives within the Ministry, and up keeping and maintaining the IT infrastructure.
The role of other officials is provided in the table below. (Detailed Qualifications of the Officials in provided in Annexure IV)
Table 12: Role and Responsibilities of Ministry Level Organization Structure
Department Roles and Responsibilities
Project Champion
• Project prioritization within Ministry• Identification and resolution of interdependencies• Annual projects budgeting• Preparing Project Detailed Reports for submission to PMO• Ministry projects management at all stages• Implementing and using a Project Management Information System• Track project progress with respect to desired outcomes and outputs
and report the same to senior stakeholders
IT Capacity Building Expert
• Design a Capacity Building Strategy for the Ministry• Design the Training Plan• Conduct Trainings of the officials• Monitor the trainings• Procurement of experts from Outsourced agencies for providing
training
Government Process
Re-engineering
Expert
• Monitor the BPR reforms implementation in the Ministry• Monitor the service levels• Identify further BPR opportunities for improvement in service levels• Implement the BPR recommendations
Domain Experts
• Monitor the BPR reforms implementation in the Ministry• Monitor the service levels• Identify further BPR opportunities for improvement in service levels• Implement the BPR recommendations
PricewaterhouseCoopers
Page 60Confidential
Development of e-Government Strategy and Implementation PlanInception Report
IT
Infrastructure Expert
• Design IT infrastructure requirements• Support in Bid Process Management for procurement of IT
infrastructure• Test the IT infrastructure procured• Support in Hardware and Software installation
IT Security Expert
• Design IT Security Requirements• Implementation of IT Security requirements• Review the Security Controls
Application Expert
• Design Application architecture• Design the Application Controls• Monitor the Software Development• User Acceptance Testing
PMO Support – Tools and Infrastructure Support
Table 13: PMO Support
Function Tools and Infrastructure Support
Programme Management
Technology Tools: Project Tracking, Document Management, Knowledge Management, Planning and Tracking Tool, Report Writer, risk management, change management, progress recording
Methodologies : Project Management, Risk Management, Communication Management, Change Management, Training, Capacity Building, Project Assessment, Project Proposal and creation, etc.
Infrastructure: Network connectivity, Mail Management, all office suit products and other office management products like projectors, visual boards, Video Conferencing facilities, etc.
Fund Management Fund Management System, Financial Management System, Management Information System, Guidelines for project procurement and bid evaluation
Technical Assistance / Capacity Balancer
Standard template for capability gap assessment, guidelines for processing technical assistance support
HR / Training Standard template and assessment methodology for training need assessment; formal linkages with select national/international training institutes for actual delivery
Communication Appointment of a Public Relations (PR) and an advertising agencies to manage communication – internal and external
Policies / Standard Setting
Representation on standard setting working groups, Regular training and study tours on new technology and applications
Centre of Strong knowledge management tools; Data miningPricewaterhouseCoopers
Page 61Confidential
Development of e-Government Strategy and Implementation PlanInception Report
Excellence/Knowledge Management
PricewaterhouseCoopers
Page 62Confidential
Development of e-Government Strategy and Implementation PlanInception Report
PricewaterhouseCoopers
Page 63Confidential
Section 4 – STRATEGIC DIMENSION 1 – SERVICES ENABLEMENT
Development of e-Government Strategy and Implementation PlanInception Report
IV. Strategic Dimension 1 - e-Services Enablement
I. IntroductionA service is defined as an interaction or a set of interactions that involve exchange of information / documents between customers and the government. There are two types of services as enunciated below:
i) Informational Services: includes those services that solely provide information to customers and do not involve processing of any transactions or documents. For example, providing procedural information for requesting a service / facility, providing status update of applications for availing services etc. Informational services have relatively simple back-office operations and can be easily electronically enabled.
ii) Transactional Services: includes those services where customers require specific actions to be taken by the department. For example, issue of a driving license is a transactional service. Transactional services mandate a higher degree of customer interaction and more complex delivery operations than informational services
II. Guiding Principles for electronic enablement of Service
PricewaterhouseCoopers Page 64Confidential
Focus on designing eServices around citizen needs
Any service should be electronically enabled only after business process has been re-engineered for that particular service.
Electronic enablement of services should result in visible enhancement of customer experience in terms of faster turnaround time, lesser visits to government offices and / or lesser cost of availing services (cost should not be confused with fees)
Development of e-Government Strategy and Implementation PlanInception Report
III. Recommendations and TargetsBased on the above guiding principles, 219 services have been considered for phase-wise electronic enablement. (This list of services is however not static and could vary at time of actual project implementation as- Ministries, Agencies may have added or modified their services or even make changes at time of finalizing the application requirements & functionality, for their services.)
Some of the other recommendations are:
1. The Services should be presented on the e-Government portal as per the services life-cycle (explained in detail in Annexure I) so that the customers can access services intuitively.
2. The services for various groups such as businesses, individuals, government employees, visitors should be segregated to facilitate easy and fast navigation.
3. In order to implement the services in an integrated manner, bundle of services should be grouped as priority projects (discussed later).
4. Clear-cut service levels must be defined for electronically enabled services. The services should be designed such that breach of service levels is escalated to the higher levels so as to fix accountability for delays.
5. Electronic enablement of a service does not mean that no further work is required to be done regarding that service. It is imperative to provide robust maintenance support to facilitate acceptable uptime and performance of the eServices. Features of eServices should also be improved with technological improvements and based on feedback from users.
IV. Agency Priority Projects The electronic enablement of services will be realized through the implementation of Twelve (12) Agency Priority projects. The underlying idea is that the services can be electronically enabled in a sustainable manner only when the organization that offers the respective services takes ownership of the electronic enablement.
Each of these 12 projects is detailed out in the next few pages. The service enablement across the priority projects is provided in the table below
Table 14: Agency Priority Projects
S.No.Agency Priority
ProjectsYear
1 Year 2 Year 3 Year 4 Year 5 Total
1 Agricultural Services 15 6 8 0 0 29
2Benefits Management system 0 2 3 0 0 5
3 Education 5 3 5 0 0 13
PricewaterhouseCoopers
Page 65Confidential
Page 65
Development of e-Government Strategy and Implementation PlanInception Report
S.No.Agency Priority
ProjectsYear
1 Year 2 Year 3 Year 4 Year 5 Total
4 Health 0 4 10 0 0 14
5 E Trade 0 6 5 7 0 18
6 Employment 1 6 0 0 7
7 Transport 6 8 0 0 0 14
8 Tourism 0 4 2 4 4 14
9 Tax 7 6 0 0 0 13
10 e-Court 0 4 7 0 0 11
11 e-Municipality 0 25 13 19 5 62
12 Passport & Visa 2 4 5 11
Total Services 35 73 64 30 9 211
The e-Service enablement across the 12 priority projects is provided in the table below
Table 15: e-Service Enablement of Agency Priority Projects
Agency Priority Projects Year 1 Year 2 Year 3 Year 4 Year 5 Total
Agricultural Services
15
296 8
Benefits Management system
2
53
Education
5
133 5
Health
4
1410
e-Trade
6
185 7
Employment
1
76
Transport
6
148
PricewaterhouseCoopers
Page 66Confidential
Page 66
Development of e-Government Strategy and Implementation PlanInception Report
Tourism
4
142 4 4
Tax
7
136
e-Court 114 7
e-Municipality
25
6213 19 5
e-Passport
2
114 5
Yearly Services 35 73 64 30 9
Total Services ( 77 Informational,134 Transactional) 211
Transactional
Informational
Details of each of the Agency Priority Project is provided in further sections
PricewaterhouseCoopers
Page 67Confidential
Page 67
Development of e-Government Strategy and Implementation PlanInception Report
V. Agriculture ServicesInitiative name
e-Agriculture
Objective To provide information & services to all stakeholders in the Agriculture sector (farmers, importers, exporters, investors, Government/regulatory agencies, research & support institutions) efficiently using ICT, and enable all stakeholders to contribute & participate in the development of the Agriculture Sector.
Outcomes expected
Improvement in Agriculture services provided by Government
Provide access & improve access to informational & transactional services to all stakeholders across the country
Improve Government administration and supervision of the Agriculture sector by using ICT
Improve overall quality & productivity/yield in Agriculture sector in the country by providing timely access to information on agriculture techniques, practices, cropping, weather, markets etc
Strengthening of Agrinet project
Coverage Ministry of Agriculture
Departments of – Agriculture development, Agriculture marketing, Natural Resource, Disaster prevention, preparedness & food security (DPPA), Animal & Plant health, Plan & Program, Human resource dev., women affairs, Information & tec. Management, Procurement, finance & property admin and Public relations
Regional Agriculture Bureaus
Subordinate organizations including DPPA, EIARP (Ethiopian institute of Agr. Research), EGTE – Ethiopian Grain trading enterprise, NVI – Veterinary Institute and IBC – Biodiversity centre
List of major components to be addressed
Agriculture portal – with separate sections for each of the stakeholders (farmers, Government and support institutions) or separate portals and including services for all stakeholders
Agriculture information & management system
Services that will be delivered
Service Major component
Cate
gory
Servic
e T
ype
Ch
an
nels
PricewaterhouseCoopers
Page 68Confidential
Page 68
Development of e-Government Strategy and Implementation PlanInception Report
Initiative name
e-Agriculture
Information services1. Provision of data on the Agro-
processing Industry.2. Crop Failure Reports3. Provision of information on
Enabling Environment, Financing, and Infrastructure in the agro-processing industry.
4. Provision of Information on Market Fragmentation and Investment Potential.
5. Provision of Information on Quality Standard Implementation and Certification.
6. Provision of Information on Competition Indicators in the Agricultural sector.
7. Provision of Information on Investment Incentives in the Agro-processing Industry.
8. Information on prices of Fertilizers, Pesticides, Seeds, and Crops.
9. Technical services and support for farmers.
10. Irrigation Request by farmers.11. Information on livestock disease
control & surveillance12. Information on animal
infrastructure distribution & personnel
13. Information on quarantine inspection and certification
14. Information on rural land admin. Policies, procedure & guidelines
15. Information on natural resources conservation
Portal, Agriculture Information & Management system
G2
C, G
2G
, G2
B
Info
rmatio
nal
Natio
nal W
eb
porta
l, Min
istry porta
l, Mob
ile, IC
T C
en
ters
PricewaterhouseCoopers
Page 69Confidential
Page 69
Development of e-Government Strategy and Implementation PlanInception Report
Initiative name
e-Agriculture
Transactional servicesAgricultural Product Inspection and Certification Services:
For Investors or any Business man who is engaged in import and/or export of plant and animals products for commercial purposeApplication for python sanitary inspection on export and import.Application for the import or export pesticide for commercial purposeApplication for plant import permit, etc
Services relating to provision of Farm Land to Investors :
Local or Foreign Investors who need Agricultural land for Investment, the following requirements and services are given by MoA.
Application form to obtain the landProvision of Information on the potential Agricultural landTechnical and Administration supportContinuous follow-up and support on the land use, Land management
Other transactional servicesCustom clearance certificate for agriculture importsCertificate of competence on agricultureCertificate of import & export of animal & crop products
Portal, Agriculture Information & Management system
G2
C, G
2B
Tra
nsa
ction
al
Natio
nal W
eb
porta
l, Min
istry porta
l, Mob
ile, IC
T C
en
ters
Implementation plan Yr. v/s
Project
Implementation Plan
Year 1Year 2
Year 3 Year 4 Year 5
Sp
read
of
sub
-pro
jects Portal
DevelopmentAIMS
Continuous improvement /updation of policy and regulatory framework ensuring the safety, authenticity, integrity and availability of the envisaged services
PricewaterhouseCoopers
Page 70Confidential
Page 70
Development of e-Government Strategy and Implementation PlanInception Report
Initiative name
e-Agriculture
across all the delivery channels & Expansion & Strengthening of Agrinet
Budget 33.86 Mil. Birr
Pre-Requisites The above mentioned initiative is a comprehensive project envisaging a complete end to end automation of some of the core functions of the ministry and agencies. For end to end automation of the service delivery, it will be important that core infrastructure projects run in parallel and are completed on time. Following core projects will have to be executed on time for successful implementation of the initiative
National Data Set (NDS) National Enterprise Service Bus (NESB) National Integrated Authentication Framework (NIAF) National Payment Gateway (NPG) Public key infrastructure (PKI) National Wide Area Network (WOREDANET) Implementation of the Network Master Plan
Apart from the key core projects to be undertaken for the successful implementation of the initiative the success of the health initiative will directly depend of the how successfully Ethiopia achieves high level of Internet and Mobile penetration and how successfully private hospitals are integrated into the system.
PricewaterhouseCoopers
Page 71Confidential
Page 71
Development of e-Government Strategy and Implementation PlanInception Report
VI. Benefits Management SystemInitiative name
Social Benefits Management System
Objective Provisioning of major informational and transactional services related to transport ministry through electronic channels thereby improving the service delivery’s quality and efficiency.
Outcomes expected
Better awareness about benefit schemes due to single source of information
Higher satisfaction of beneficiaries with benefit schemes due to a single interface to access these schemes and faster turnaround times
The service delivery can be monitored centrally for all benefit schemes making it easy to access the impact and benefits of the various schemes
Better controls to check leakages in the systemCoverage Ministry of Labor and Social Affairs
Social Security Agency Department of Postal services Addis Ababa City Administration
List of major components to be addressed
Benefit Schemes Portal (BSP) Pension Management System (PMS) e-Municipality
PricewaterhouseCoopers
Page 72Confidential
Page 72
Development of e-Government Strategy and Implementation PlanInception Report
Initiative name
Social Benefits Management System
Services that will be delivered
Service Major component C
ate
gory
Servic
e
Typ
e
Channels
Web-based information publishing
Benefit Schemes Portal (BSP)
G2
C
Info
rmatio
nal
National Web portal, Ministry portal, Mobile, ICT Centers, call center
Benefits eligibility calculator
Benefit Schemes Portal (BSP)
G2
C
Info
rmatio
nal
National Web portal, Ministry portal, ICT Centers, call center
Applications for availing benefits
Benefit Schemes Portal (BSP)
G2
C
Tra
nsa
ction
al
National Web portal, Ministry portal, ICT Centers, call center
Pension Services (Pensioner registration, and pension payment)
Pension Management System (PMS)
G2
C
Tra
nsa
ction
al National Web
portal, Ministry portal, Mobile, ICT Centers
Support Letter (for unemployment; free health treatment, scholarships)
e-Municipality
G2
C
Tra
nsa
ction
al National Web
portal, Mobile, Ministry portal, ICT Centers
Implementation plan Yr. v/s
ProjectImplementation plan
Year 2 Year 3 Year 4
Sp
read
of
sub
-p
roje
cts
PMSSBP
Integration of various subprojects into a seamless and single Social Benefits Management System
PricewaterhouseCoopers
Page 73Confidential
Page 73
Development of e-Government Strategy and Implementation PlanInception Report
Initiative name
Social Benefits Management System
Continuous improvement / updation of policy and regulatory framework to ensure that benefits reach the intended beneficiaries through all available service delivery channels.
Budget
33.63 Mil. BirrPre-Requisites
This initiative is a comprehensive project that would integrate all the welfare programs of the Government of Ethiopia. For end to end automation of the delivery of the welfare programs, it will be important that core infrastructure projects run in parallel and are completed on time. Following core projects will have to be executed on time for successful implementation of the initiative
National Data Set (NDS) National Enterprise Service Bus (NESB) National Integrated Authentication Framework (NIAF) Public key infrastructure (PKI) National Wide Area Network (WOREDANET) Implementation of the Network Master Plan
Apart from the key core projects to be undertaken for the successful implementation of the initiative, the success of the project will also depend on the success of marketing and awareness activities as the target group - underprivileged section of the society, is the least aware about new schemes and policies.
PricewaterhouseCoopers
Page 74Confidential
Page 74
Development of e-Government Strategy and Implementation PlanInception Report
VII. Education Initiative name
e-Education
Objective To provide information & services to all stakeholders in the Education sector (students, teachers, Government/regulatory agencies, and educational institutions) efficiently using ICT, and enable all stakeholders to contribute & participate in the development of the Education Sector.
Outcomes expected
Improvement in education services provided by Government
Provide access to education across the country
Improve teaching standards by providing on-line access to latest teaching aids, material, techniques
Improve Government administration and supervision of the education sector by using ICT
Improve overall quality of education in the country through distance learning, E-learning, computer based training (CBT)
Strengthening of Schoolnet project
Coverage Ministry
General Education, Higher Education & Technical & Vocational Education Training (TVET) departments
Regional Education Bureaus
List of major components to be addressed
Education portal – with separate sections for each of the 3 depts. (general, Higher and TVET) or three separate portals.
Student management system – including registration, admission and complete student records – for government schools & colleges
Examination management system
Education Institutes (schools, colleges, etc) administration system, including internal work-flow management system for the ministry, to provide services electronically
Providing, facilitating internet connectivity with adequate bandwidth to schools & other educational institutions
PricewaterhouseCoopers
Page 75Confidential
Page 75
Development of e-Government Strategy and Implementation PlanInception Report
Initiative name
e-Education
Services that will be delivered
Service Major component
Cate
gory
Servic
e
Typ
e
Channels
National Exam results
Examination management system
G2
C
Info
rmatio
nal National Web
portal, Ministry portal, Mobile, ICT Centers
Student placement results
G2
C
Info
rmatio
na
l National Web portal, Ministry portal, Mobile, ICT Centers
Teacher placement results
G2
C
Info
rmatio
nal
National Web portal, Ministry portal, Mobile, ICT Centers
Student registration
Education administration system and Student management system
G2
C
Tra
nsa
ction
al National Web
portal, Ministry portal, Mobile, ICT Centers
Certificate for completion of high school (original & replacement)
G2
C
Tra
nsa
ction
al National Web
portal, Ministry portal, Mobile, ICT Centers
Certificate for completion of degree (original & replacement)
G2
C
Tra
nsa
ction
al
National Web portal, Ministry portal, Mobile, ICT Centers
Publish education statistics
G2
G &
G2
C
Info
rmatio
nal
National Web portal, Ministry portal, Mobile, ICT Centers
PricewaterhouseCoopers
Page 76Confidential
Page 76
Development of e-Government Strategy and Implementation PlanInception Report
Initiative name
e-Education
Implementation plan
Yr. v/s Project
Implementation PlanYear 1 Year 2 Year 3 Year 4 Year 5
Sp
read
of
sub
-pro
ject
s
Exam Management System
Student Management System
Education administration System
Integration of various core projects and various channels
Continuous improvement /updation of policy and regulatory framework ensuring the safety, authenticity, integrity and availability of the envisaged services across all the delivery channels & Schoolnet project
Budget
48.70 Mil. BirrPre-Requisites
The above mentioned initiative is a comprehensive project envisaging a complete end to end automation of some of the core functions of the ministry and agencies. For end to end automation of the service delivery, it will be important that core infrastructure projects run in parallel and are completed on time. Following core projects will have to be executed on time for successful implementation of the initiative
National Data Set (NDS) National Enterprise Service Bus (NESB) National Integrated Authentication Framework (NIAF) National Payment Gateway (NPG) Public key infrastructure (PKI) National Wide Area Network (WOREDANET) Implementation of the Network Master Plan Expansion & Strengthening of Schoolnet project
Apart from the key core projects to be undertaken for the successful implementation of the initiative the success of the E-Education initiative will directly depend of the how successfully Ethiopia achieves high level of Internet and Mobile penetration and how successfully all education sector stakeholders are integrated into the system.
PricewaterhouseCoopers
Page 77Confidential
Page 77
Development of e-Government Strategy and Implementation PlanInception Report
VIII. E-Health Initiative name
e-Health
Objective Provisioning of major informational and transactional services related to Health through electronic channels thereby improving the service delivery’s quality and efficiency.
Outcomes expected
Convenience to the general public , healthcare institutions( hospitals and pharmacies) for informational and transactional services
Improvement in the service levels of health ministry’s services leading to timely medical aid to the citizens thereby improving the overall health scenario in the country
Uniform and transparent licensing process leading to efficient health care service delivery
Convenient and accurate monitoring of certification and license status of health care institutions
Putting HSDP project on a fast track and aligning the e governance objectives with the 8 project components of HSDP project
Coverage Ministry
Government Hospital
Regional Health Bureaus
Woreda Health offices
Agencies
Pharmacies
Private Hospitals
List of major components to be addressed
Health Ministry Portal (HMP)
Hospital Information Management System (HMIS)
Drug Information Management System (DIMS)
Integration of hospitals(Public and Private), Pharmacies
National Payment gateway
PricewaterhouseCoopers
Page 78Confidential
Page 78
Development of e-Government Strategy and Implementation PlanInception Report
Initiative name
e-Health
Services that will be delivered
Service Major component
Cate
gory
Info
/ T
ran
sactio
nal
Channels
Issuance of Drug Marketing license
Issuance and renewal of Certificates of competence to drug establishmentsIssuance, Renewal and cancellation of drug registration certificateIssuance of certificate of competence to health professionalsIssuance of licenses to hospitalsIssuance, Renewal and cancellation of license to conduct clinical trialsBooking of AppointmentsNotification of Test resultsHospital Information
HMIS G2
C
Info
rmatio
nal National Web
portal, Ministry portal, Mobile, ICT Centers
Drug pricing information
DMIS G2
CG
2B
Info
rmatio
nal
National Web portal, Ministry portal, Mobile, ICT Centers
Drug Availability DMIS G2
CG
2B
Info
rmatio
nal
National Web PricewaterhouseCoopers
Page 79Confidential
Page 79
Development of e-Government Strategy and Implementation PlanInception Report
Initiative name
e-Health
Implementation plan
Yr. v/s Project
Implementation PlanYear 1 Year 2 Year 3 Year 4 Year 5
Sp
read
of
sub
-pro
jects
HMP
HMISDMIS
Integration of various core projects and various channels
Continuous improvement /updation of policy and regulatory framework ensuring the safety, authenticity, integrity and availability of the envisaged services across all the delivery channels.
Pre-Requisites
The above mentioned initiative is a comprehensive project envisaging a complete end to end automation of some of the core functions of the ministry and agencies. For end to end automation of the service delivery, it will be important that core infrastructure projects run in parallel and are completed on time. Following core projects will have to be executed on time for successful implementation of the initiative
National Data Set (NDS) National Enterprise Service Bus (NESB) National Integrated Authentication Framework (NIAF) National Payment Gateway (NPG) Public key infrastructure (PKI) National Wide Area Network (WOREDANET) Implementation of the Network Master Plan
Apart from the key core projects to be undertaken for the successful implementation of the initiative the success of the health initiative will directly depend of the how successfully Ethiopia achieves high level of Internet and Mobile penetration and how successfully private hospitals are integrated into the system.
Budget 46.87 Mil. Birr
PricewaterhouseCoopers
Page 80Confidential
Page 80
Development of e-Government Strategy and Implementation PlanInception Report
IX. E-Trade
Initiative name
e-Trade
Objective Provisioning of major informational and transactional services related to Trade and Industry through electronic channels thereby improving the service delivery’s quality and efficiency.
Outcomes expected
Convenience to the Industries, Businesses ,Large, Medium, Small and Micro Enterprises, Investors and the general public for informational and transactional services
Improvement in the service levels of Trade and Industry ministry’s services leading to timely Business aid to the citizens thereby improving the overall Economic scenario in the country
Uniform and transparent licensing process leading to efficient Trade and Industrial service delivery
Convenient and accurate monitoring of certification and license status of Business institutions
Putting SMME Development project on a fast track and aligning the e governance objectives with the Agencies and Bureaus
Facilitating and developing the Import and Export Trade linkages
Coverage Ministry of Trade
Ministry of Works and Urban development
Public Sector Undertaking(PSU)
Regional Trade and Industry Bureaus
Woreda Trade and Industry offices
Agencies
Large Industries
Small Micro and Medium Enterprises (SMME)
Foreign and Domestic Investors
International Relations
Sectoral Growth
List of major components to be addressed
Trade and Industry Portal
Works & Urban Development Application (WUD)
Enterprise(SMME & Large Industries) Management System (EMS)
Trade (Import/Export) Management System (TMS)
Investors Management System(IMS)PricewaterhouseCoopers
Page 81Confidential
Page 81
Development of e-Government Strategy and Implementation PlanInception Report
Initiative name
e-Trade
Integration of Domestic(Public and Private) Enterprise Linkages
Sector and Business specific ICT Infrastructure and Applications Support
PricewaterhouseCoopers
Page 82Confidential
Page 82
Development of e-Government Strategy and Implementation PlanInception Report
Initiative name
e-Trade
Services that will be delivered
Service Major component
Cate
gory
Info
/ T
ran
sactio
nal
Channels
Provision of Investor Information
IMS
G2
B
Info
rmatio
nal
National Web portal, Ministry portal, Mobile, ICT Centers
Policies on Business Loans
G2
B
Info
rmatio
nal
National Web portal, Ministry portal, Mobile, ICT Centers
Trade name and trade mark registration and renewal
G2
B
Tra
nsa
ction
al
National Web portal, Ministry portal, Mobile, ICT Centers
Collection of fines if businesses operate without license or outdated license
G2
B
Tra
nsa
ction
al
National Web portal, Ministry portal, Mobile, ICT Centers
Requesting for Business area
G2
B
Tra
nsa
ction
al
National Web portal, Ministry
PricewaterhouseCoopers
Page 83Confidential
Page 83
Development of e-Government Strategy and Implementation PlanInception Report
Initiative name
e-Trade
Implementation plan
Yr
v/s
Pro
js Implementation Plan
Year 2 Year 3 Year 4 year 5
Sp
read
of
su
b-P
roje
cts
Ministry Portal
WUD, IMS
TMS
EMSIndustry Linkages
Hosting Business Specific ApplicationsCore Infrastructure
EMS, TMS and IMS Management Systems shall be purely
informational in Year 1 with web interfaces. These systems shall be developed for specific workflow
applications in Year 2 and Year 3.
Industry Linkages are initiatives to explore and implement synergies between the sectors/Industries and also between SMME and Large industries
Customized Business specific ICT Applications and Infrastructure shall be developed and hosted for usage by the Local industries. These could be implemented in collaboration with the Private sector on appropriate PPP Models.
Budget – 9.83 Mil. Birr
Pre-Requisites The above mentioned initiative is a comprehensive project envisaging a complete end to end automation of some of the core functions of the ministry and agencies. For end to end automation of the service delivery, it will be important that core infrastructure projects run in parallel and are completed on time. Following core projects will have to be executed on time for successful implementation of the initiative
National Data Set (NDS)
National Enterprise Service Bus (NESB)
National Integrated Authentication Framework (NIAF)
National Payment Gateway (NPG)
Public key infrastructure (PKI)
National Wide Area Network (WOREDANET)
Implementation of the Network Master Plan
PricewaterhouseCoopers
Page 84Confidential
Page 84
Development of e-Government Strategy and Implementation PlanInception Report
Initiative name
e-Trade
Agrinet
Apart from the key core projects to be undertaken for the successful implementation of the initiative the success of the e-Trade initiative will directly depend on how successfully Ethiopia achieves high level of Internet and Mobile penetration and how successfully SMMEs are integrated into the system.
ICT Support to Domestic Industries:
ICT support in terms of Infrastructure, Information and Linkages through ICT shall be extended to the local Industries and Small Micro and Medium Enterprises (SMMEs) in particular. Specific Software solutions shall be built for the SMME sector in view of the Growth and Transformation Plan of Ethiopia as follows.
Developing the micro and small-scale enterprises sector so that it contributes, to the development of the industrial sector as a whole serve as the basis, and contributes to the development of the agricultural sector and create employment opportunities.
Enabling all industries to utilize their full capacity in order to increase production and productivity.
o Enable the sector to develop strong linkage with the agricultural, medium and large scale industrial sector.
o Improving SMES management skills in a coordinated and networked manner with the existing extension systems.
o Working in collaboration with TVET and other appropriate institutions in expanding and strengthening the urban industrial extension programs.
o Providing credit facilities and develop saving culture for MSEs.
X. EmploymentInitiative name
Employment Management System
Objective Provisioning of major informational and transactional services related to Employment to the ministry of Labour through electronic channels thereby improving the service delivery’s quality and efficiency.
Outcomes expected
Management of Unemployment in the country
Issuance and certification for unemployment
Integration and licensing of the Agencies
Issuance and renewal of work permit
Coverage Ministry of Labor and Social Affairs
Addis Ababa City Administration
List of major components to be
Employment Information Portal
Employment Management System
PricewaterhouseCoopers
Page 85Confidential
Page 85
Development of e-Government Strategy and Implementation PlanInception Report
Initiative name
Employment Management System
addressedServices that will be delivered
Service Major component
Cate
gory
Servic
e
Typ
e
Channels
Unemployment Registration/ Unemployment Certificate
Employment Information
PortalEmployment Management
System
G2
C
Tra
nsa
ction
al
National Portal, Ministry of Labour Portal, ICT centers.
Overseas employment registration for Ethiopian Nationals
G2
C,
G2
G
National Portal, Ministry of Labour Portal, ICT centers.
Employment Agency License Renewal
Employment Management
System
G2
B
Tra
nsa
ction
al National Portal,
Ministry of Labour Portal, ICT centers.
Employment Agency Licensing (New)
Employment Management
System
G2
B
Tra
nsa
ction
al
National Portal, Ministry of Labour Portal, ICT centers.
Foreign Nationals work permit Employment
Management System
G2
C, G
2G
Tra
nsa
ction
al National Portal,
Ministry of Labour Portal, ICT centers.
Job Matching, Labour Market Information
Employment Information
Portal
G2
C
Info
rmati
on National Portal,
Ministry of Labour Portal, ICT centers.
PricewaterhouseCoopers
Page 86Confidential
Page 86
Development of e-Government Strategy and Implementation PlanInception Report
Initiative name
Employment Management System
Registration of –Labour UnionsEmployment UnionsWork PlacesCollective AgentsSafety & Health CommitteesWork place accidentsInstitution & Partner Organisations
Employment Information
PortalEmployment Management
System
G2
C, G
2B
Tra
nsa
ction
al
National Portal, Ministry of Labour Portal, ICT centers
Implementation plan
Yr. v/s Project
Implementation PlanYear 2 Year 3 Year 4 Year 5
Sp
read
of
sub
-pro
jects Employmen
t Portal
Employment Management System
Integration with other systemsPre-Requisites
This initiative is a comprehensive project that would integrate all the programs of the Ministries , agencies involved. For end to end automation & delivery of the programs, it will be important that core infrastructure projects run in parallel and are completed on time. Following core projects will have to be executed on time for successful implementation of the initiative
National Data Set (NDS) National Enterprise Service Bus (NESB) National Integrated Authentication Framework (NIAF) Public key infrastructure (PKI) National Wide Area Network (WOREDANET) Implementation of the Network Master Plan
Apart from the key core projects to be undertaken for the successful implementation of the initiative, the success of the project will also depend on the success of marketing and awareness activities as the target group - underprivileged section of the society, is the least aware about new schemes and policies.
Budget 35.04 Mil. Birr
PricewaterhouseCoopers
Page 87Confidential
Page 87
Development of e-Government Strategy and Implementation PlanInception Report
XI. TransportInitiative name
e-Transport
Objective Provisioning of major informational and transactional services related to transport ministry through electronic channels thereby improving the service delivery’s quality and efficiency.
Outcomes expected
Convenience to the general public, business community, other ministries for informational and transactional services
Improvement in the service levels of transport ministry’s services leading to efficient delivery of licenses, information and other services
Uniform and transparent licensing process leading to efficient service delivery
Convenient and accurate monitoring of certification and licenses and other vehicle registration information
Coverage Ministry
Government transport agencies
Roads Authority
Embassies
Ministry of Foreign Affairs
Private Transport/ Travel agencies
Regional Transport Authorities
List of major components to be addressed
Transport Ministry Portal (TMP)
Vehicle Registration Information System (VRIS)
Online ticket booking System (TBS)
Government Vehicle Insurance Management System (IMS)
Integration of various ministries (Ministry of Transport, Ministry of Foreign Affairs, Insurance companies, Embassies, Roads Authority)
National Payment gateway
PricewaterhouseCoopers
Page 88Confidential
Page 88
Development of e-Government Strategy and Implementation PlanInception Report
Initiative name
e-Transport
Services that will be delivered
Service Major component
Cate
gory
Info
/ T
ran
sactio
na
Channels
Issuance/ Renewal of drivers license (National/ International)
TMPVRISNPG
G2
C, G
2B
Tra
nsa
ction
al
National Web portal, Ministry portal, Mobile, ICT Centers
Application for change of ownership of vehicles
TMPVRISNPG
G2
C
Tra
nsa
ction
al
National Web portal, Ministry portal, Mobile, ICT Centers
Application and renewal of vehicle Insurance
TMPVRISIMS
G2
C
Tra
nsa
ction
al National Web
portal, Ministry portal, Mobile, ICT Centers
Application for request of special numbers
TMPVRIS
G2
C
Tra
nsa
ction
al National Web
portal, Ministry portal, Mobile, ICT Centers
Online notification and collection of fines for traffic violation
VRISNPG
G2
C
Tra
nsa
ction
al
National Web portal, Ministry portal, Mobile, ICT Centers
Online booking of tickets for inter state government transport
TMPNPGTBS
G2
C
Tra
nsa
ction
al
National Web portal, Ministry portal, Mobile, ICT Centers
Generic information on the application process, work flow, timelines, documents needed,
TMP G2
C
Info
rmatio
na
l National Web portal, Ministry portal, PricewaterhouseCoopers
Page 89Confidential
Page 89
Development of e-Government Strategy and Implementation PlanInception Report
Initiative name
e-Transport
Implementation plan
Yr. v/s Project
Implementation PlanYear 1 Year 2 Year 3 Year 4 Year 5
Sp
read
of
sub
-pro
jects
TMPVRIS
TBSIMS
Integration with Other Ministries
Integration of various core projects and various channels
Continuous improvement /updation of policy and regulatory framework ensuring the safety, authenticity, integrity and availability of the envisaged services across all the delivery channels.
Pre-Requisites The above mentioned initiative is a comprehensive project envisaging a complete end to end automation of some of the core functions of the ministry and agencies. For end to end automation of the service delivery, it will be important that core infrastructure projects run in parallel and are completed on time. Following core projects will have to be executed on time for successful implementation of the initiative
National Data Set (NDS) National Enterprise Service Bus (NESB) National Integrated Authentication Framework (NIAF) National Payment Gateway (NPG) Public key infrastructure (PKI) National Wide Area Network (WOREDANET) Implementation of the Network Master Plan
Apart from the key core projects to be undertaken for the successful implementation of the initiative the success of the e transport initiative will directly depend of the how successfully Ethiopia achieves high level of Internet and Mobile penetration and how successfully other related government agencies and ministries are integrated into the system.
Budget 41.44 Mil. Birr
PricewaterhouseCoopers
Page 90Confidential
Page 90
Development of e-Government Strategy and Implementation PlanInception Report
XII. TourismInitiative name
e-Tourism
Objective Provisioning of major informational and transactional services related to Tourism through electronic channels thereby improving the service delivery’s quality and efficiency.
Ethiopia has great scenic beauty and tourist spots. The government is keen to leverage the same to enhance the contribution of the tourism sector in the national economy. This priority project is envisaged to be a facilitator towards this end.
This project would be undertaken under the ownership of the Ministry of Culture and Tourism and participation of Ministry of Foreign Affairs.The long-term vision of the Government is to make Ethiopia one of the top tentourist destinations in Africa by the year 2020, with an emphasis on maximizing the poverty-reducing impacts of tourism, and utilizing tourism to transform the image of the country .The number of tourists who visited the country in 2009 was 412,341, obtaining $211.5 million in revenue. Ethiopia has announced plans to attract around one million tourists.
Ethiopia has unique sites to attract tourists and eight of its heritages are inscribed by UNESCO as world heritage sites. Various projects are currently being carried out to expand the tourism industry with $35 million loan obtained from the World Bank in 2009.
Outcomes expected
Convenience to the Tourists and the general public for informational and transactional services
Improvement in the service levels of Tourism ministry’s services leading to timely aid to the citizens thereby improving the overall Culture and Tourism scenario in the country
Convenient and accurate monitoring of certification and license status of Businesses in the Tourism sector.
Putting Heritage Development project on a fast track and aligning the e governance objectives with the Agencies and Bureaus
To enhance the capacity of national authorities & local communities through the development of a comprehensive & centralized database of the cultural industries
Coverage Ministry
Heritage Sites
Artifacts
Hospitality Industry (Hotels, Resorts, Traditional Accommodations, Camping Sites, Hostels, Guest Houses)
Travel Agencies
Tour Operators
Tourism Information
PricewaterhouseCoopers
Page 91Confidential
Page 91
Development of e-Government Strategy and Implementation PlanInception Report
Initiative name
e-Tourism
Travel Visa
Disaster Alert
International Relations
Sector Growth
List of major components to be addressed
Culture and Tourism Portal
Hospitality Management System(HMS)
Tour Management System (TMS)
Disaster Management System(DMS)
Travel Licenses Management System(TLMS)
Resource Management System(RMS) – (Natural and Cultural Resources, Heritage Sites, Artifacts)
Geographic Information System(GIS)
PricewaterhouseCoopers
Page 92Confidential
Page 92
Development of e-Government Strategy and Implementation PlanInception Report
Initiative name
e-Tourism
Services that will be delivered
Service Major compone
nt
Cate
gory
Servic
e
Typ
e
Channels
Registration of private tour operators
TMS
G2
B
Tra
nsa
ction
al
National Web portal, Ministry portal, Mobile, ICT Centers
Information on Tour Operators, Travel Packages, Itinerary, Fee
G2
C
Info
rmatio
nal
National Web portal, Ministry portal, Mobile, ICT Centers
Registering for a Tour G2
C
Tra
nsa
ction
al National Web
portal, Ministry portal, Mobile, ICT Centers
Registration of Hotels, Resorts, Guest Houses and Local Accommodations
HMS
G2
B
Tra
nsa
ction
al National Web
portal, Ministry portal, Mobile, ICT Centers
Information about the Accommodations
G2
C
Info
rmatio
na
l National Web portal, Ministry portal, Mobile, ICT Centers
Booking a Hotel, Resort etc G2
C
Tra
nsa
ction
al
National Web portal, Ministry portal, Mobile, ICT Centers
Registering with the DMS for alerts
DMS G2
C
Tra
nsa
ction
al
National Web portal, Ministry portal, Mobile, ICT Centers
PricewaterhouseCoopers
Page 93Confidential
Page 93
Development of e-Government Strategy and Implementation PlanInception Report
Initiative name
e-Tourism
Implementation plan
Implementation Plan
Year 2 Year 3 Year 4 Year 5
Spr
ead
of s
ub P
roje
cts
TLMS
HMS
TMS
DMS
GISCore Infrastructure
Yr v
/s
Pro
js
Ministry Portal
Pre-Requisites The above mentioned initiative is a comprehensive project envisaging a complete end to end automation of some of the core functions of the ministry and agencies. For end to end automation of the service delivery, it will be important that core infrastructure projects run in parallel and are completed on time. Following core projects will have to be executed on time for successful implementation of the initiative
National Data Set (NDS) National Enterprise Service Bus (NESB) National Integrated Authentication Framework (NIAF) National Payment Gateway (NPG) Public key infrastructure (PKI) National Wide Area Network (WOREDANET) Implementation of the Network Master Plan Agrinet
Apart from the key core projects to be undertaken for the successful implementation of the initiative the success of the e-Trade initiative will directly depend on how successfully Ethiopia achieves high level of Internet and Mobile penetration and how successfully SMMEs are integrated into the system.
Budget 36.34 Mil. Birr
Strategic Direction
The Priority projects are aligned with the cultural policy that targets to create a favorable condition to the languages, cultural, historical and natural heritage, fine arts, handicrafts, oral literature, customs and other cultural elements of the nations, nationalities and peoples of Ethiopia, receive equal recognition. The Ethiopian Tourism policy focuses on identifying the country’s historical, cultural, wildlife and natural resources to develop responsible and sustainable tourism through the participation of the private sector, local community. Moreover, the wildlife conservation policy is to create conducive environment whereby the country’s wildlife and their habitats are protected and developed in a sustainable manner.
PricewaterhouseCoopers
Page 94Confidential
Page 94
Development of e-Government Strategy and Implementation PlanInception Report
Disaster Management System
Ethiopia’s major cities like Addis Ababa, Nazret, Dire Dawa and Awassa are very near main fault lines such as the Wonji fault, the Nazret fault, the Addis-Ambo-Ghedo fault, and the Fil Woha fault lines along which numerous earthquakes of varying magnitude have occurred over the years. Other cities like Arba Minch, Dessie, and Mekele are also located in some of the most seismically active areas in the country. Hence the Government needs to constantly monitor and alert the citizens against Flood risk, Epidemic risk, Earthquake Risk, Volcanic Activity Risk etc. The Disaster Management System serves as a Disaster Alert and Coordination System provides near real-time alerts about natural disasters around the Country and tools to facilitate response coordination. It shall also provide linkages for provision of stand-by emergency centers and mobile sub-stations.
Geographic Information System (GIS)
Geographic information system (GIS) integrates hardware, software, and data for capturing, managing, analyzing, and displaying all forms of geographically referenced information.GIS systems are used in cartography, remote sensing, land surveying, Forest cover/ Population density mapping, hydrographs, public utility management, natural resource management, precision agriculture, photogrammetric, geography, urban planning, emergency arrangement, navigation, aerial video, and localized search engines. It integrates stores, edits, analyzes, shares, and displays geographic information for informing decision making. GIS applications are tools that allow users to create interactive queries (user-created searches), analyze spatial information, edit data, maps, and present the results of all these operations.
PricewaterhouseCoopers
Page 95Confidential
Page 95
Development of e-Government Strategy and Implementation PlanInception Report
XIII. TaxInitiative name
Tax
Objective Provisioning of major informational and transactional services related to Tax through electronic channels thereby improving the service delivery’s quality and efficiency.
Outcomes expected
Timely and effectively tax revenues generated efficient collections
Simplifying administration of tax and providing better control over compliance
Timely tracking of late-files and late-payers
Over all view of all taxpayer liabilities and payments
Ensure that tax payer data collected is valid and provides an easy-to use assessment calculation method
Improvement in customer satisfaction levels regarding tax related services.
Coverage Revenue and Custom Authority including the Business Processes and Directorates
Regional Branch Offices
Customs Authority Coordination offices
List of major components to be addressed
Upgradation of Standard Integrated Government Tax Administration System (SIGTAS) to Tax Management and Information System(TMIS)
National data set(NDS)
Custom and Revenue Authority Portal(Portal)
National Enterprise Service Bus (NESB)
National Payment gateway (NPG)
PKI Framework(PKI)
PricewaterhouseCoopers
Page 96Confidential
Page 96
Development of e-Government Strategy and Implementation PlanInception Report
Initiative name
Tax
Services that will be delivered
Service Major component
Cate
gory
Servic
e
Typ
e
Channels
Online application of Registration as a Taxpayer
Upgradation of SIGTASTMIS
G2
C a
nd
G
2B
Tra
nsa
ction
al National
Web portal, Authority portal, ICT Centers
Online filling of Tax Return (Land tax, Rental Housing tax (paid by owner), Turnover tax, TV tax, VAT, and Excise tax)
G2
C a
nd
G
2B
Tra
nsa
ction
al National
Web portal, Ministry portal, ICT Centers
File a declaration
G2
C a
nd
G
2B
Tra
nsa
ction
al National
Web portal, Ministry portal, ICT Centers
View Pending messages
G2
C a
nd
G
2B
Info
rmatio
nal National
Web portal, Ministry portal, Mobile, ICT Centers
View Registration Data
G2
C a
nd
G
2B
Info
rmatio
nal
National Web portal, Ministry portal, Mobile, ICT Centers
View Field assessments
G2
C a
nd
G
2B
Info
rmatio
nal
National Web portal, Ministry portal, Mobile, ICT Centers
View list of decelerations not filed
G2
C a
nd
G
2B
Info
rmatio
nal
National Web portal, Ministry portal, Mobile, ICT
PricewaterhouseCoopers
Page 97Confidential
Page 97
Development of e-Government Strategy and Implementation PlanInception Report
Initiative name
Tax
Implementation plan
Yr
v/s
Pro
js Implementation Plan
Year 1 Year 2 Year 3 Year 4 year 5
Sp
read
of
Su
b -
Pro
jects
Portal
TMIS
Integration of various Sub Projects and various channels
Continuous improvement /updation of policy and regulatory framework ensuring the safety, authenticity, integrity and availability of the envisaged Tax related services across all the delivery channels
Pre-Requisites
The above mentioned initiative is a comprehensive project envisaging a complete end to end automation of some of the core functions of the Authority. For end to end automation of the service delivery, it will be important that core infrastructure projects run in parallel and are completed on time. Following core projects will have to be executed on time for successful implementation of the initiative
National Data Set (NDS) National Enterprise Service Bus (NESB) National Payment Gateway (NPG) Public key infrastructure (PKI) Up gradation of National Wide Area Network (WOREDANET)
Apart from the key core projects to be undertaken for the successful implementation of the initiative the success of the Tax initiative will directly depend of the how successfully Ethiopia achieves high level of Internet and Mobile penetration and how successfully all the Branch and coordination offices s are integrated into the system.
Budget 43.37 Mil. Birr
PricewaterhouseCoopers
Page 98Confidential
Page 98
Development of e-Government Strategy and Implementation PlanInception Report
XIV. e-CourtInitiative name
e-Court Management System
Objective Provisioning of major informational and transactional services related to Court to Ministry of justice, Federal Supreme Courte and Regional Courts through electronic channels thereby improving the service delivery’s quality, tracking and efficiency.
Outcomes expected
Better awareness about functioning and processes of the Ministry of Justice, Federal Supreme Court.
Digitized copy of the Law, Acts and case Documents.
Applications for the Case filling, Property Details etc.
Coverage Ministry of Justice
Federal Supreme Court
Regional Court
List of major components to be addressed
E-Court Portal
Property and Land management system
Case Management Application
PricewaterhouseCoopers
Page 99Confidential
Page 99
Development of e-Government Strategy and Implementation PlanInception Report
Initiative name
e-Court Management System
Services that will be delivered
Service Major component Cate
gory
Servic
e typ
e
Channels
Buying & Selling Property Agreement e-Court Portal,
Property and Land Management System
G2
C,G
2B
, G2
G
Tra
nsa
ction
al
National Portal, ICT Centers
Land OwnershipLand transferProperty RegistrationApplication for a Pleading
e-Court portal, Case management Application
G2
C,G
2B
, G2
G
Tra
nsa
ction
al
National Portal, ICT Centers
Document TransferCase Filing
Adjourning Cases
G2
C,G
2B
, G2
G
Tra
nsa
ction
al
National Portal, ICT Centers
Implementation plan Yr. v/s
ProjectImplementation Plan
Year 2 Year 3 Year 4 Year 5
Sp
read
of
sub
-pro
ject
s e-Court informational Portal
Case Management System
Property and Land Management System
Integration with Regional Court and Property Systems
Pre-Requisites
This initiative is a comprehensive project that would integrate all the programs of the Justice Ministry. For end to end automation of the
PricewaterhouseCoopers
Page 100Confidential
Page 100
Development of e-Government Strategy and Implementation PlanInception Report
Initiative name
e-Court Management System
delivery of the programs, it will be important that core infrastructure projects run in parallel and are completed on time. Following core projects will have to be executed on time for successful implementation of the initiative
National Data Set (NDS) National Enterprise Service Bus (NESB) National Integrated Authentication Framework (NIAF) Public key infrastructure (PKI) National Wide Area Network (WOREDANET) Implementation of the Network Master Plan
Apart from the key core projects to be undertaken for the successful implementation of the initiative, the success of the project will also depend on the success of marketing and awareness activities as the target group - underprivileged section of the society, is the least aware about new schemes and policies.
Budget 31.80 Mil. Birr
PricewaterhouseCoopers
Page 101Confidential
Page 101
Development of e-Government Strategy and Implementation PlanInception Report
XV.MunicipalitiesInitiative name
e-Municipality Management System
Objective Provisioning of the e-services to ensure a safe and clean environment for a healthy and productive society with improved access to social services and physical infrastructure.
Outcomes expected
Institute good governance with efficiency, transparency and accountability to the residents.
Overall citizen satisfaction by providing convenience and improved service delivery.
Provide decision support system to the Addis Ababa city administration Cabinet, Bureaus, Authorities and Agencies for better planning, development and management.
Improve the quality of Citizen Service Delivery System and offer these services with optimal effectiveness and transparency.
Allow data sharing across different departments, thus bringing about the efficiency in administration functioning.
Help different departments to improve their revenue collection efficiency.
Harness the use of technology to create sense of achievement amongst employees and citizens.
Coverage All Urban Local bodies of federal and Regional
List of major components to be addressed
Municipal Portal
Certificate generation module
Payment / Tax collection Module
Accounts Module
Licenses Module
Project Systems (for Water/Sewerage / Roads /Building etc.)
GIS Application
Grievance Information System
Human Resource Management System
Document & Workflow Management System
e-Procurement
Asset Management System
Material Management System
Fleet Management System
PricewaterhouseCoopers
Page 102Confidential
Page 102
Development of e-Government Strategy and Implementation PlanInception Report
Initiative name
e-Municipality Management System
PricewaterhouseCoopers
Page 103Confidential
Page 103
Development of e-Government Strategy and Implementation PlanInception Report
Initiative name
e-Municipality Management System
Implementation Plan
Agency Service Majo
r C
om
pon
en
t
Cate
gory
Servic
e
Typ
e
Channels
A.A. City Administration Communication Affairs Bureau
Information Provision about A.A. City Administration
Ad
dis A
bab
a
City
Info
rmatio
n
Porta
l
All
Info
rmatio
nal
Portal
A.A Mass Media Agency
Request for Archives of News, Television Programs, Radio Programs
Porta
l, Sto
rag
e S
erve
r, Grie
van
ces re
dre
ssed
system
G2
G
Tra
nsa
ction
al
Portal
Download of Radio Program
All
Info
rmatio
nal Portal,
Mobile
Download of News
All
Info
rmatio
nal Portal, Mobile
Application for sponsorship of News, Communications
G2
B
Tra
nsa
ction
al
Portal, ICT centre
Request to post News
G2
B
Tra
nsa
ction
al Portal, ICT
centre
Request Portal, ICT PricewaterhouseCoopers
Page 104Confidential
Page 104
Development of e-Government Strategy and Implementation PlanInception Report
Initiative name
e-Municipality Management System
Implementation Plan
Yr. v/s Projec
t
Implementation Plan
ModulesYear 2
Year 3
Year 4
Year 5
Sp
read
of
core
an
d s
ub
-pro
ject
s
Municipal PortalCertificate generation modulePayment / Tax collection ModuleAccounts ModuleLicenses ModuleProject Systems (for Water/Sewerage / Roads /Building etc.)GIS ApplicationGrievance Information SystemHuman Resource Management SystemDocument & Workflow Management Systeme-ProcurementAsset Management SystemMaterial Management SystemFleet Management System
Pre-Requisites
This initiative is a comprehensive project that would integrate all the programs of the City Administration of Addis. For end to end automation of the delivery of the programs, it will be important that core infrastructure projects run in parallel and are completed on time. Following core projects will have to be executed on time for successful implementation of the initiative
National Data Set (NDS) National Enterprise Service Bus (NESB) National Integrated Authentication Framework (NIAF) Public key infrastructure (PKI) National Wide Area Network (WOREDANET) Implementation of the Network Master Plan
Apart from the key core projects to be undertaken for the successful implementation of the initiative, the success of the project will also depend on the success of marketing and awareness activities as the target group - underprivileged section of the society, is the least aware about new schemes and policies.
PricewaterhouseCoopers
Page 105Confidential
Page 105
Development of e-Government Strategy and Implementation PlanInception Report
Initiative name
e-Municipality Management System
Budget 37.97 Mil. Birr
PricewaterhouseCoopers
Page 106Confidential
Page 106
Development of e-Government Strategy and Implementation PlanInception Report
XVI. Passport & VisaInitiative name
Passport & Visa Management System
Objective Automation of services provided with respect to issue, renewal of passports and visa services of Ministry of Foreign Affairs
Outcomes expected
Better functioning and processes of the Ministry of Foreign Affairs
Faster & more efficient issue and management of applications and documents
Reduction in opportunities for fraudulent applications
Coverage Ministry of Foreign Affairs
Immigration Offices
International Airport
List of major components to be addressed
Passport & Visa Management Application
Status check facility on channels (Portal, call centre, etc)
Services that will be delivered
Service Major component Cate
gory
Servic
e typ
e
Channels
Application
Passport & Visa Management
system
G2
C,G
2B
, G2
G
Tra
nsa
ction
al
National Portal, ICT Centers
Renewal
Replacement
Visa Application, Processing & Issue
PricewaterhouseCoopers
Page 107Confidential
Page 107
Development of e-Government Strategy and Implementation PlanInception Report
Initiative name
Passport & Visa Management System
ID Card issue to Foreign Nationals
Implementation plan Yr. v/s
ProjectImplementation Plan
Year 1 Year 2 Year 3 Year 4S
pre
ad
of
sub
-p
roje
cts
Passport & Visa Management System
Pre-Requisites
This initiative is a comprehensive project that would integrate the programs of the Foreign Affairs Ministry in passport and visa areas. For end to end automation & delivery of the program, it will be important that core infrastructure projects run in parallel and are completed on time. Following core projects will have to be executed on time for successful implementation of the initiative
National Data Set (NDS) National Enterprise Service Bus (NESB) National Integrated Authentication Framework (NIAF) Public key infrastructure (PKI) National Wide Area Network (WOREDANET) Implementation of the Network Master Plan
Apart from the key core projects to be undertaken for the successful implementation of the initiative, the success of the project will also depend on the success of marketing and awareness activities as the target group - underprivileged section of the society, is the least aware about new schemes and policies.
Budget 31.80 Mil. Birr
PricewaterhouseCoopers
Page 108Confidential
Page 108
Development of e-Government Strategy and Implementation PlanInception Report
Core Projects
Introduction:The e-Government strategy for Ethiopia has identified several strategic priority projects. These projects when implemented would deliver electronic services. As these projects cut across ministries and also if these projects are to deliver fully transactional services over the various electronic channels, it is absolutely essential to develop a robust infrastructure on which these projects should be hosted. This infrastructure would include the following to be implemented during the first 3 years of the strategy implementation.
Table 16: Core Projects
S.No.
Core Projects Strategy Alignment Current Status
Owner Ministry
Estimated Cost
1 National Data Set (NDS)
This infrastructure is required at a National Level to provide a commonly used master database which can be shared across ministries
Need to set up
MoCIT 367 Mil. Birr
2 National Enterprise Service Bus (NESB)
This infrastructure is required at the National Level to act a platform for exchanging data between ministries on a common platform
Need to set up
MoCIT 20.60 Mil. Birr
3 National Integrated Authentication Framework (NIAF)
This infrastructure is required at the National Level to authenticate users on the various electronic channels. This facility will provide secure user login based on certain credentials
Need to set up
MoCIT 36 Mil. Birr
4 National Payment Gateway (NPG)
This infrastructure is required for providing a unified payment system for all ministries / agencies to deliver payment related eServices through the identified channels
Need to set up
MoCIT 28.08 Mil. Birr
5 Public Key Infrastructure (PKI)
This infrastructure is required both to facilitate electronic transactions and provide required
Project in progress, alignment required as
MoCIT 124.75 Mil. Birr
PricewaterhouseCoopers
Page 109Confidential
Page 109
Development of e-Government Strategy and Implementation PlanInception Report
security for the same. per the
strategy6 Enterprise
Architecture (EA)
Development of EA for all Ministries in line with the National framework
Needs to be done
MoCIT 6.30 Mil. Birr
7 National Data Centre (NDC)
This infrastructure provides the common hosting facility for all government applications, core projects etc.
Project in progress, alignment required as per the strategy
MoCIT
8 National Wide Area Network (WOREDANET)
This infrastructure is required to provide the back bone connectivity for all ministries and agencies to be in a common wide area network
Project in progress, alignment required as per the strategy
MoCIT
Implementation Plan for the Core Projects –The core projects, as mentioned are proposed to be implemented in the 1st three years of implementation of the strategy implementation, considering the fact that they would be building blocks/ or the facilitators for the priority project implementation. Broad level implementation plan of the core projects is as below –
Table 17: Core Projects- Implementation Plan
Yr. v/s Project
Implementation plan
Year 1 Year 2 Year 3 Year 4 Year 5
National Data Set
National Enterprise Service Bus
National Integrated Authentication Framework
National Payment Gateway
Public Key Infrastructure
Enterprise Architecture
PricewaterhouseCoopers
Page 110Confidential
Page 110
Development of e-Government Strategy and Implementation PlanInception Report
The details of these initiatives are provided in the coming sections. A logical diagram of these infrastructures is provided below for reference:
PricewaterhouseCoopers
Page 111Confidential
Page 111
BusinessEmployee
CitizenCust
omer
s
Private Agencies
Mobile kioskServ
ice
Deliv
ery
Chan
nels
Ministry Portal
National Enterprise Service Bus(Integration Layer)
Application
Database
Ministry 2
Application
Database
NIAF
Application
Database
Ministry 1
Application
Database
NationalPayment Gateway
Operational Applications / Databases @ Ministries
NCC National Portal
Application
Database
NDS
Application
Database
Public Key Infrastructure
WOREDANET
NDC
Development of e-Government Strategy and Implementation PlanInception Report
XVII. National Data Set:Initiative name National Data Set
Objective Provisioning a national level data set of commonly used data elements across ministries, that can be used by all inter-ministerial applications as well as channels of delivery (national portal, mobile portal, CSC, NCC etc.) for delivering eServices
Outcomes expected
A database system to support all business requirements of the government
A nation-wide metadata standard for creating and maintaining data repositories for any kind of information in government
A common database for data sharing, data integrity, data redundancy, database security between ministries
Support standardized nomenclature and value for common data across ministries
Assist in better integration of services and applications across ministries
Drive the National Meta Data standards
Reduce the dependency of applications, channels, interacting with multiple master data bases
Coverage The coverage of NDS would be the following: All ministries and agencies of Ethiopia
List of major components to be addressed
Build a central read-only repository of most commonly required master data that can be shared to all the data consumers (government ministries as well as private) as a single source of truth
Develop and Maintain Metadata Standards (data owner, data source system, data type, data width, standard values, etc.) for uniform understanding of the data among the data providers and data consumers
PricewaterhouseCoopers
Page 112Confidential
Page 112
Development of e-Government Strategy and Implementation PlanInception Report
Services that will be delivered
Data sharing and validation by the respective entities
Project duration The expected project duration is 1.5 to 2 years. The project may be initiated within 6 months of the start of the eGovernment strategy implementation
Critical Success Factors
Clearly articulated Data ownership responsibility
Data sharing policy and guidelines
Communication infrastructure for data sharing (ESB)
Development of data architecture
Dedicated project teams during implementation
Dedicated team for operations and maintenance
Implementation options
As these projects involve specialized software and hardware, this should be implemented as a turnkey solution.
PricewaterhouseCoopers
Page 113Confidential
Page 113
Development of e-Government Strategy and Implementation PlanInception Report
XVIII. National Enterprise Service Bus:Initiative name National Enterprise Service Bus (NESB)
Objective Provisioning a platform for seamless integration of ministry / agency applications and database at the back end; integrating all front end channels to deliver eServices
Outcomes expected
Increasing business agility: NESB enables enterprise to respond quickly to new business changes, develop distinctive new capabilities and leverage existing services for true responsiveness.
Simpler systems: NESB are based on industry standards and loosely coupled integration will reduce complexity when compared with integrating systems on a solution-by-solution API-based integration basis.
Standards: Service-oriented architectures make it possible for organizations to develop, implement and reuse processes that are technically enabled and integrated through the use of web services standards such as XML, SOAP and WSDL
Process/Data High Availability: NESB would provide high availability for business process runtime and process data, without any complex hardware and configuration.
Ensure better scalability, reducing integration expense, and lowering maintenance costs.
Coverage All ministry and agency applications identified in the eGovernment strategy
List of major components to be addressed
Develop a nation-wide SOA and governance model for service delivery
Set up of hardware and software for NESBServices that will be delivered
The NESB will act as an interconnection to bridge various component services provided by ministries for exchange of information. This would include the following:
Seamless integration of applications and databases of ministries / agencies to deliver eServices
Create SOA based service architecture
Act as a framework for routing or mediating the information that flows between ministries, transforming the messages between requestors and providers
Project duration The expected project duration is 1.5 to 2 years. The project may be initiated within 6 months of the start of the eGovernment strategy implementation
Critical Success Factors
Identify the list of all business services for integration
Alignment of SOA for developing services
Existence of Data sharing policy and guidelines
Dedicated project teams during implementation
Dedicated team for operations and maintenance
Implementation options
As these projects involve specialized software and hardware, this should be implemented as a turnkey solution.
PricewaterhouseCoopers
Page 114Confidential
Page 114
Development of e-Government Strategy and Implementation PlanInception Report
A logical diagram of the NESB describing the various components and interaction is provided below:
PricewaterhouseCoopers
Page 115Confidential
Page 115
NIAFNSEB
Figure 11: National Enterprise Service Bus
Development of e-Government Strategy and Implementation PlanInception Report
XIX. National Integrated Authentication Framework:Initiative name National Integrated Authentication Framework - NIAFObjective Provisioning of a unique identity based login to individuals for
accessing the various electronic channels of government (National Portal, Mobile Portal, Common Service Centre (CSC) and National Contact Centre (NCC) & other ministry applications.
Outcomes expected Single authentication facility for individuals, business and government to be used across all ministries and agencies
Assist in building other capabilities on the electronic channels like personalization
Can be offered as an authentication management solution for private sector like banks, business offices etc.
Coverage The IAF is envisaged to be utilized by the following: Applications: All government electronic Channels- National
portal, Ministry websites (Intranet and internet), Mobile, CSC, NCC, all ministry back end applications
Usage: To be provided to all citizens and legal residents of Ethiopia
List of major components to be addressed
Set up the NIAF infrastructure Provisioning of all levels of authentication Integration with channels and eServices
Services that will be delivered
A national authentication framework – IAF to have the following levels of authenticationLevel 1: Username & passwordLevel 2: Username & password + BiometricLevel 3: Username & password + Biometric +Token (RSA, PKI)
Project duration The expected project duration is 1.5 to 2 years. The project may be initiated within 6 months of the start of the eGovernment strategy implementation
Critical Success Factors
The above mentioned initiative is a comprehensive project envisaging the complete end to end automation of authenticating all individuals of Ethiopia to use the various electronic services provisioned on electronic channels. The pre-requisites are:
A nation-wide unique identity number (UIN) for all citizens and residents of Ethiopia
Data base of the Unique id Infrastructure for high end authentication – chip based
(smart card) for all (UIN), PKI certificates Availability of an Nation-wide enterprise service bus to
integrate the NAG services to all requestors
Dedicated project teams during implementation
Dedicated team for operations and maintenance
Implementation options
As these projects involve specialized software and hardware, this should be implemented as a turnkey solution.
PricewaterhouseCoopers
Page 116Confidential
Page 116
Development of e-Government Strategy and Implementation PlanInception Report
A logical diagram of the National Integrated Authentication Framework describing the various components and interaction is provided below:
PricewaterhouseCoopers
Page 117Confidential
Page 117
Figure 12: National Integrated Authentication Framework
Development of e-Government Strategy and Implementation PlanInception Report
XX.National Payment Gateway:Initiative name National Payment Gateway
Objective Provisioning of a national payment gateway for Ethiopia to enable all modes of electronic payments to be transacted through all the electronic channels of delivery
Outcomes expected
Single, unified electronic payment solution across all government entities.
Enable all government payment services under one umbrella; making it easy, convenient and secure payment process for all its citizens, businesses and the government.
Provide for greater payment flexibility, features & methods Enables all modes of payment -Card based payments, Direct
Debit & eBanking, eWalletCoverage All transactional payment eServices
All electronic channels that accept electronic payments
List of major components to be addressed
Set up the National Payment Gateway infrastructure Provisioning of all payment types Integration with channels and eServices
Services that will be delivered
Set up the payment gateway infrastructure with payment mechanisms such as - Credit cards, Direct Debits, Net Banking, ePurse, eWallet, eVouchers and/or, Any other payments that is currently available in the proposed product by the respondent need to be included in the solution
Project duration The expected project duration is 1.5 to 2 years. The project may be initiated within 6 months of the start of the eGovernment strategy implementation
Critical Success Factors
Availability of eTransaction laws to support electronic payment Availability of infrastructure at the financial institution levels
e.g. Banks to become Payment Service Providers (Card acquires, card issuers, merchant banks etc.)
Compliance with international laws and practices for enabling electronic payments like PCIDSS
Dedicated project teams during implementation Dedicated team for operations and maintenance
Implementation options
As these projects involve specialized software and hardware, this should be implemented as a turnkey solution.
PricewaterhouseCoopers
Page 118Confidential
Page 118
Development of e-Government Strategy and Implementation PlanInception Report
A logical diagram of the National Payment Gateway describing the various components and interaction is provided below:
PricewaterhouseCoopers
Page 119Confidential
Page 119
Figure 13: National Payment Gateway
Development of e-Government Strategy and Implementation PlanInception Report
XXI. Public Key InfrastructureInitiative name Public Key Infrastructure (PKI)
Objective Provisioning of PKI based identification, integrity and non-repudiation for online transactions related to the eGovernment projects in Ethiopia
Outcomes expected
Ensuring safe and reliable online transactions for government, public and private
Support the use of other online systems line Payment Gateway, Authentication Framework, eServices, document signing etc.
Coverage Nationwide initiative for issuance and use of PKI for all electronic transactions for government and private
List of major components to be addressed
Set up of the PKI environment Provisioning the PKI services Create suitable laws for support and use of PKI in online
transactionsServices that will be delivered
Data encryption services for government and private
Identity verification using digital keys
Provide end users with eSignature, time stamping, etc.
Integration with eServices and applications for use
Project duration The expected project duration is 1 to 1.5 years. The project may be initiated within 6 months of the start of the eGovernment strategy implementation
Critical Success Factors
Availability of electronic signature act, decree or ordinance Availability of eTransaction laws to support electronic payment Availability of infrastructure at the institution levels for using
the PKI Readiness of applications and systems to use PKI based
authentication Compliance with international laws and practices for enabling
electronic payments like PCIDSS
High skilled man power in the PKI area
Increased PKI awareness level in ministries/agencies
Create high bandwidth and ICT penetration
Good telecommunications infrastructure
Dedicated project teams during implementation
Dedicated team for operations and maintenance
Implementation options
As these projects involve specialized software and hardware, this should be implemented as a turnkey solution.
PricewaterhouseCoopers
Page 120Confidential
Page 120
Development of e-Government Strategy and Implementation PlanInception Report
PricewaterhouseCoopers
Page 121Confidential
Page 121
Figure 14: Public Key Infrastructure (PKI)
Development of e-Government Strategy and Implementation PlanInception Report
XXII. Woreda NetInitiative name Woreda-net
Objective Provisioning of high bandwidth connectivity between ministries and agencies for sharing data, voice and video communication throughout the country
Outcomes expected
Create / establish a government wide area network
Create single unified, reliable, robust and secure Intranet for the Government thereby facilitating effective communication and creating less paper environment.
Provide connectivity to all the e-Government applications.
Coverage All the participating ministries, agencies, regional and local government offices to be covered in the Woreda-net
Services that will be delivered
216 services would be delivered
Project duration Phase I: Ethiopia has already covered 13 ministries with fiber optic connectivity and 700 Woredas with terrestrial and VSAT connectivity.Phase II: This phase would cover additional 10 Ministries and 175 woredas in the next 1 Year. Over a period of 5 years all the participating ministries, agencies, regional and local government offices to be covered in the Woreda-net
Critical Success Factors
Availability of telecom provider to enable high bandwidth Availability of infrastructure at the institution levels High skilled man power for maintenance of the WAN Good telecommunications infrastructure Availability of High security infrastructure Dedicated project teams during implementation Dedicated team for operations and maintenance
Implementation options
As these projects involve specialized software and hardware, this should be implemented as a turnkey solution.
The current status of the existing WOREDA Net is provided below: (WOREDA is the administrative equivalent of a District)
Table 18: Existing WOREDA Net
S. No. Region/Site Name Total no of site
(connectivity)
Connectivity
VPN VSAT
1 Federal Office 3 3 -2 Addis Ababa Region 11 11 -
3 Tigray Region 39 5 34
4 Amhara Region 116 7 110
5 Oromia Region 199 3 195
6 Somalia Region 46 1 45
7 Beneshangul Gumuz Region 21 21 21
8 SNNP Region 106 3 103
PricewaterhouseCoopers
Page 122Confidential
Page 122
Development of e-Government Strategy and Implementation PlanInception Report
S. No. Region/Site Name Total no of site
(connectivity)
Connectivity
VPN VSAT
9 Afar Region 37 37 37
10 Gambella Region 10 10 10
11 Harari Region 1 1 -
12 Dir Dawa Region 1 1 -
Total 590 36 554
XXIII. Data CenterThe Ethiopian National Data Centre (ENDC), under the management of MOCIT, aims to provide reliable ICT Infrastructure and storage facilities to all Government ministries and departments by hosting required hardware, software and applications in a centralized, secure environment, connecting National Data Center and Regional Data Centers (RDC) through fiber optics. 260 terra bytes (TB) and 60 TB of storage capacity is available at ENDC and RDC respectively.
PricewaterhouseCoopers
Page 123Confidential
Page 123
Development of e-Government Strategy and Implementation PlanInception Report
Figure 15: Proposed Nationwide Data center Layout
It is proposed that the Ethiopian National Data Centre (ENDC) would consolidate services, applications and infrastructure to provide efficient electronic delivery of G2G, G2C and G2B services. ENDC infrastructure shall provide adequate space to house ICT assets of various departments and Government agencies within the country in an environment that meets the need for reliability, availability, scalability, security and serviceability. Various applications and some of the functionalities envisaged at the ENDC include Secure Central Data Repository of Ethiopian e-government, Core Application Servers, Service Delivery Gateway, Citizen Information/Services Portal, Government Intranet Portal, Remote Management and Service Integration facility.
Ethiopian National Data Centre will act as a mediator and convergence point between open unsecured public domain and sensitive government environment. The ENDC is equipped to host / co-locate systems such as Web Servers, Application Servers, Database Servers, SAN, and NAS etc.
PricewaterhouseCoopers
Page 124Confidential
Page 124
Development of e-Government Strategy and Implementation PlanInception Report
Recommendations:
1) Presently the data centre is not available on 24/7/365 basis – though the infrastructure and facilities to provide on 24/7 basis have been created. The NDC is now operating on a single 8 hour shift. Hence there is a need to have 24x7 Team of trained resources at the Data Centres with well defined roles and responsibilities for each team member.
2) Reporting structure of the Data Centre Resouces should be published and shared with the respective Ministires and other government Agencies.
3) Complete Catalog of the inventory (Hardware/ Software) needs to be maintianed and updated regularly along with the vendor details.
4) A detailed Service catalog has to be maintained for each of the service that are being delivered through the Data Centres e.g: IP phone, V-Con, Web, Portal / Application hosting, e-Mail Etc..
5) Currently services being provided by NDC need to be fully used by the various ministries, agencies – e.g Though e-mail server and DNS are available and official mail ids can be used by all government personnel, this is not happening due to lack of a directive from the government making it mandatory for all govt. bodies to use official e-mail/domain. And most of govt. currently uses personal mail ids for govt. correspondence.
6) Domain(.gov..et) has to be created for all Ministries, Agencies and Federal Government to bring them all under that domain umbrella.
7) The infrastructure (Storage, IP Addresses and Connectivity etc.) for each of the Ministries, Agency at the National and Regional Data Centres should be planned, allocated and made available.
Presently NDC does have block of IP addresses and also provides facilities for server co-location, provision of dedicated or shared servers for the various ministries. However these facilities should be provided in a planned and organised manner, as per the Governments’ own ICT implementation plans as well as per the plans of the individual ministries and agencies.
8) The Network capacity of the National Portal needs to be upgraded, considering that E-services will be implemented fully within couple of years. Further, the govt. also plans to migrate the portal to an open source platform.
9) Presently the connectivity between NDC and RDCs is through fibre links. There is a need to build in redundancy and provide back-up connectivity through other media like VSAT, RF etc..
10)DR sites (13 in number) are in process of being implemented. Good practices for establishment of Disaster Recovery Centres such as building the DRC in a seismic zone different from where the Data Centre is hosted should be adhered to.
11)Capacity utilisation of NDC should be improved. E.g Though NDC is in a position to provide around 100 servers for the various ministries, agencies, only around 30 servers are being used.
PricewaterhouseCoopers
Page 125Confidential
Page 125
Development of e-Government Strategy and Implementation PlanInception Report
XXIV. National Enterprise Architecture Framework
Initiative name National Enterprise Architecture Framework (NEAF)
Objective Developing enterprise architectures for all Ministries in alignment with the NEAF
Outcomes expected
Unified architecture adoption across ministries enabling better integration of ministry applications
Identification and implementation of proper governance mechanism for IT implementation across the country
Unified standards, guidelines, taxonomies and processes for IT implementation (including software, hardware, interoperability standards)
Identification of core and common projects which will act as an enabler for eGovernment implementation
Reducing the cost of IT implementation by minimizing the duplicity, increasing re-usability, thereby providing better RoI.
Coverage Nationwide initiative for all ministries and agenciesList of major components to be addressed
Develop an EA for each ministry in line with the NEAF and eGovernment Strategy
Identification of core and common projects to be implemented across the country
Set up of the EA governance framework for continuous monitoring and adoption
Services that will be delivered
NEAF is a framework to be used by all ministries to develop the various architectures proposed. This architecture would form the base for eGovernment strategy implementation i.e. the services and strategic priority initiatives proposed.
Identification of ministry specific, core and common projects to be implemented
Defining the roles and responsibilities for implementation
Project duration Since EA is a pre-requisite for any Business-IT implementation alignment, it would be appropriate to develop the EA for all ministries during the initial phase of eGovernment strategy implementation i.e. in the first year of strategy implementation. The ministry wise EA would be considered as the strategy implementation blueprint.
Critical Success Factors
Buy-in from High level (ministers of all ministries) for EA adoption
Availability of required trained man power in each ministry on NEAF
Set up of EA governance body
Provision of suitable technical bodies at a national level to guide EA development, consolidation of EA of all ministries and also manage the EA implementation.
Provisioning a good EA tool for knowledge management
Continuous training for the ministerial staff on EA adoption
Dedicated project teams during implementationImplementation There are two options for EA implementation:
PricewaterhouseCoopers
Page 126Confidential
Page 126
Development of e-Government Strategy and Implementation PlanInception Report
Initiative name National Enterprise Architecture Framework (NEAF)options 1. In-house development: EA development is a continuous
activity and therefore, training the internal teams in ministries and agencies to develop their own EA would be the most sustainable model for Ethiopia. However, this option would be time consuming, as providing training to all the key employees and then developing EA would take considerable time thereby delaying the eGovernment strategy implementation.
2. Consultant supported: In this model, an EA consultant may support the ministries to develop the first version of EA. The ministries and agencies should dedicate a core team to work with the consultants during the EA development. This would ensure that the ministry team acquires the ability to develop EA as an on-the-job training. This option would consume less time for completion.
As a part of the strategy recommendation, we suggest option 2 as the involved in this case would be less and also provide on-the-job training.
Alignment of EA and eGovernment strategy
Ethiopia has already developed an EA framework for the country. This framework is all encompassing and has considered the various elements of the Ethiopia IT initiatives. The alignment of the EA with the eGovernment strategy is provided below depicting the major components:
NEAF Reference Components
eGovernment Strategy Alignment
Government Services Architecture
Strategy has identified the various business services that have to be delivered to the customers and also the channels of delivery. However, the EA framework need to be used to develop the processes, KPIs, etc to develop the business life cycle processes of each of these ministry / agency services
Application Architecture
The eGovernment strategy has identified most of the core, common and ministry specific applications required for supporting the eGovernment strategy. However, EA may re-validate the same during the EA development. Each ministry will identify the list of applications required to support the government service delivery. This will consolidated at the national level and then the core, common and ministry specific applications will be duly allocated with roles and responsibilities for implementation.
Data Architecture The strategy has identified National Data Set as a core project. During the EA implementation, the NDS has to be further elaborated technically to include the data elements, data structure, metadata etc.
Technology architecture
The components related to technology – hardware, software, integration platforms, security, GDN (Woreda-net) etc has been identified at a high level by the eGovernment strategy. These projects need to be further elaborated from the technology adoption side while developing the Technology architecture.
PricewaterhouseCoopers
Page 127Confidential
Page 127
Development of e-Government Strategy and Implementation PlanInception Report
PricewaterhouseCoopers
Page 128Confidential
Page 128
Development of e-Government Strategy and Implementation PlanInception Report
The overall EA reference model is provided below:
GOVERNMENT SERVICE ARCHITECTURE
APPLICATIONS ARCHITECTURE
DATA ARCHITECTURE
TECHNOLOGY ARCHITECTURE
APPLICATION , TECHNOLOGY, DATA AND SECURITY STANDARDS, GUIDELINES, SPECIFICATIONS
LEG
AL &
REG
ULA
TORY
FR
AMEW
ORK
GO
VERN
ANCE
FRA
MEW
ORK DELIVERY
CHANNELS
SERVICES PROVISIONING
CORE APPLICATIONS
COMMONAPPLICATIONS
MINISTRY SPECIFICAPPLICATIONS
COMMON NATIONAL DATA SET
METADATA REPOSITORY
ENTERPRISE INFORMATION MANAGEMENT
HARDWARE / SYSTEM SOFTWARE
INTEGRATION PLATFORMS
SECURITY
GOVERNMENT WIDE AREA NETWORK
Every aspect of Ethiopian life is ICT assisted
ICT infrastructure development
Human resource development
ICT for egovernance service delivery
ICT for agriculture modernization
ICT for improved health
ICT in the education sector
ICT in Industry and Private sector
ICT for research and development
Vision
StrategicInitiatives
ETHIOPIAN ENTERPRISE ARCHITECTURE REFERENCE MODEL
BUSINESS DRIVERS FOR ENTERPRISE ARCHITECTURE
Figure 16: The overall EA reference model
PricewaterhouseCoopers
Page 129Confidential
Page 129
Development of e-Government Strategy and Implementation PlanInception Report
XXV. Common ApplicationsCommon applications need to be made available across the Ministries and Agencies to enable smooth functioning and provide focus on implementation of the priority projects by reducing the effort required. The common applications would also facilitate collaboration and consistency across common processes such as procurement, HR management, Financial Management etc.
S.No. Common Applications Owner Ministry Estimated Cost
1 E-Procurement MoFED 16.03 Mil. Birr
2 HRMS Ministry of Civil Services
22.13 Mil. Birr
3 E-office MoCIT 16.03 Mil. Birr
4 Financial management Information System (FMIS)
MoFED 4.03 Mil. Birr
Proposed Implementation Plan for Common Applications
Yr. v/s Project
Implementation plan
Year 1 Year 2 Year 3 Year 4 Year 5
e-Procurement
HRMS
e-Office
FMIS
XXVI. e-ProcurementGiven the high percentage of government procurement as a percentage of total procurement in the economy, a comprehensive eProcurement solution can substantially improve efficiency and cost effectiveness of government procurement. eProcurement system will provide businesses and ministries with a common platform to transact. With features such as demand aggregation, catalogue based procurement, dynamic pricing engine, etc; the system is expected to cut down the transaction costs for not only the government, but also
PricewaterhouseCoopers
Page 130Confidential
Page 130
Back-end / Legacy Systems
Government e-Procurement Meta-site Homepage
User/Dept. Specific View (Personalisation)
Back-end Application Integration & External Interfaces
Data Analysis (Spend and Demand)
Core Transaction Platform; Content
Catalog Based Procurement,
eRFX, eTenders
Search, Yellow Pages,
Advertisements, Business News, Announcements
Supplier Self-Service
Zone
Dynamic Pricing Engine
(Auctions, Reverse
Auctions, Negotiations)
Multi-Channel Delivery
AdvertisersAgency/Buyers
Govt.Employees
Suppliers
External Service
Providers
Other eProc. Portals
SuppliersGovernment Co-operative
Enterprise eProcurement
Portals
Back-end / Legacy Systems
Government e-Procurement Meta-site Homepage
User/Dept. Specific View (Personalisation)
Government e-Procurement Meta-site Homepage
User/Dept. Specific View (Personalisation)
Back-end Application Integration & External Interfaces
Data Analysis (Spend and Demand)
Back-end Application Integration & External Interfaces
Data Analysis (Spend and Demand)
Core Transaction Platform; Content
Catalog Based Procurement,
eRFX, eTenders
Search, Yellow Pages,
Advertisements, Business News, Announcements
Supplier Self-Service
Zone
Dynamic Pricing Engine
(Auctions, Reverse
Auctions, Negotiations)
Multi-Channel Delivery
AdvertisersAgency/Buyers
Govt.Employees
Suppliers
External Service
Providers
Other eProc. Portals
SuppliersSuppliers
External Service
Providers
Other eProc. Portals
SuppliersGovernment Co-operative
Enterprise eProcurement
Portals
Figure 17: eProcurement
Development of e-Government Strategy and Implementation PlanInception Report
suppliers. It is envisaged that training will be provided to small and medium enterprises so that they can also benefit from the solution.
e-Procurement solution will take care of the end-to-end procurement process, including:
Vendor management
Catalogue management
Bid process management
Auctions
Payment management
Contract management
Main benefits that should accrue due to implementation of the e-Procurement system include:
Transparency and accountability in procurements
Reduction in cost of procurement for government due to increased competition and demand aggregation
Reduction in cost of bidding by 50%
Improve turnaround time for payments
Following key activities need to be undertaken to establish an e-Procurement system for the Government of Ethiopia:
As part of the project, the following key activities are required to be undertaken:
1. Reengineering and streamlining the complete public procurement process
2. Development of the eProcurement solution with the requisite functionalities
3. Procurement of hardware for hosting the application
4. Develop a meta-site homepage dedicated to eProcurement that can also be accessed through the eGovernment portal
5. Vendor development programme
XXVII. Government wide HRMSThe efficient management of government resource personnel is imperative to bring in efficiency and improve productivity. A government wide Human Resource Management System is a compelling tool for this purpose. It is recommended that Government wide HRMS solution is commissioned across all government agencies under the leadership of Ministry of Civil Services. As per the assessment study, some work has already been undertaken in this regard. At a minimum following steps need to be undertaken to bring this to fruition:
1. Analysis of the management information needs of the Civil Services Agency and the HR departments of the ministries
2. Decision regarding development of a new software or purchase of a Commercial-off- the- shelf (COTS) HRMS solution. COTS solution is faster to procure and also has
PricewaterhouseCoopers
Page 131Confidential
Page 131
Development of e-Government Strategy and Implementation PlanInception Report
good practices embedded within, so using a COTS HRMS with minimum customizations can potentially yield higher performance improvements.
3. User training and awareness campaign to build support and uptake is required.
Following benefits are envisaged from this project:
Employee empowerment
Enhancement of computer usage skills of employees as they are likely to use the system for availing services
Efficient and effective management of the government workforce
XXVIII. Financial Management Information System
An Integrated Budget and Expenditure System (IBEX) is an integrated financial management information system (IFMIS) addressing the core functions of public financial management with the flexibility to include other non-core functions has been developed by Ministry of Finance and Economic Development. It is a custom built solution using industry standard products and open source frameworks that has been developed to support public financial management reforms in Ethiopia. The IBEX web application is deployed on the country’s WoredaNET infrastructure.
IBEX is an integrated budget and accounts financial application, which provides the framework for core public financial management functions and has the following core modules
Budget Module: This module executes all the budget preparation activities performed by government financial offices.
Account Module: This module executes all the budget execution activities of government budgetary institutions. More specifically, the accounts module records the financial transactions of the budgetary institutions, records the aggregated monthly accounting reports and provides accounting reports for ledgers, financial statements, management reports, transactions, expenditures and revenues.
Budget Adjustment Module: This module provides the functionality to address changes to the approved budget during budget execution. It specifically enables the recording of budget transfers and budget supplements and the subsequent production of the adjusted budget.
Budget Control Module: This module manages the activities of recording budget commitments and disbursement payments in order to enable budgetary control over expenditures.
Account Consolidation Module: This module consolidates the budget and accounting data for the entire country. This module allows for the generation of regional and national consolidated reports.
PricewaterhouseCoopers
Page 132Confidential
Page 132
Development of e-Government Strategy and Implementation PlanInception Report
Disbursement Module: This module manages the public treasury functions
associated with cash management and disbursing funds between public financial institutions.
Administration Module: This module provides an interface to manage users and user’s profiles that interact with the IBEX system.
Figure 18: IBEX System
PricewaterhouseCoopers
Page 133Confidential
Page 133
Development of e-Government Strategy and Implementation PlanInception Report
Under the e-Government Strategy it is envisaged to upgrade this system by undertaking the following initiatives:
Implementation of the IBEX application across all the Regions in the Country
Standardization of process and workflow for using IBEX across different Ministries/Agencies to simply the process of data compilation
Hosting of the IBEX application in the National Data Centre
XXIX. eOffice / Document Management As more public constituents demand instant access to public information, government agencies need an efficient, affordable and accessible solution that eliminates paper work and provides a simple, searchable and secure way to publish documents on an intranet or the Internet. Going forward, the idea is to eliminate the paper-based interactions even within the government across different agencies by using a single solution. Document Management addresses the life cycle of documents (workflow), provides library services (versioning, security, audit trails), maintains components of documents (compound documents) and manages the long-term archives (records management). Managing documents typically involves structured business processes that are document-centric, and often involve lengthy and complex documents; examples include legal or regulatory documents (e.g., land records, applications, and standard operating procedures), contracts and proposals. A document management system helps in streamlining the internal processes to create a paperless office by ensuring an effective migration of old documents from legacy systems to the archives.
This strategic initiative is envisaged to provide the following benefits:
Communications management through digital registration and routing of government communications
Efficiency in receipt, processing & output
Performance management through standardization and automation of repetitive processes
Knowledge management
Transparency and accountability in operations
Cost-effectiveness
PricewaterhouseCoopers
Page 134Confidential
Page 134
eOffice
Enterprise Content ManagementRole and Group
ManagementContent Collection
and CreationContent
TransformationLibrary
Services
Metatagging WorkflowMulti-
Language
Document & Records Management
Digital Asset Management
Collaboration
Knowledge Management
Figure 19: eOffice Components
Development of e-Government Strategy and Implementation PlanInception Report
Responsive to customers
PricewaterhouseCoopers
Page 135Confidential
Page 135
Development of e-Government Strategy and Implementation PlanInception Report
Following are the broad steps required for implementing the solution:
1. Analysis
a. Scope/definition of the system
b. Analysis of requirements
c. Analysis of the IT infrastructure
d. Envisioning of the system
2. Design
a. Definition of requirements
i. Solution evaluation
ii. IT infrastructure definition
iii. Data migration
b. Definition of documentation and training
c. Transition planning
d. Implementation design
3. Development
a. Vendor selection
b. IT development
c. User documentation
d. Testing
4. Implementation
a. System implementation
b. IT support
c. User training
5. Roll out of the solution.
XXX. Government wide email system Email can be used as a very effective medium for the inter-office and intra-office communication. Though some of the departments use the commonly used web-based mailing services, it is limited by internet access. The email-ids must be created for the important functionaries in the department. Since the email system will be common across the departments, the common system can be used across with the standardization in email addresses.
The Government has already undertaken commencement of this initiative and this may be speeded up and completed quickly, so as to help in the Strategy implementation.
PricewaterhouseCoopers
Page 136Confidential
Page 136
Development of e-Government Strategy and Implementation PlanInception Report
PricewaterhouseCoopers
Page 137Confidential
Page 137
Section 4 – STRATEGIC DIMENSION 2 – CHANNELS
V. Strategic Dimension 2 - Channels
I. IntroductionThe term channel connotes the means through which services are delivered to the customers. Channel Strategy represents a set of business-driven choices about how and through what means services will be delivered to customers.
The central theme of the e-Government strategy is to enhance public service delivery through the phased electronic enablement of services. However, provisioning services through electronic means is only useful if it facilitates the customers to access services anytime and anywhere in a more convenient manner. Identifying channels of customers’ preference is a critical success factor for effective eGovernment, as the choice of delivery channels has a major impact on the following:
Technology infrastructure required to support the channel such as hardware, software and networking.
Standard procedures and guidelines required to operate the channel.
Organization structure required to manage and deliver the electronic services such as skills, roles and alliances.
Convenience and satisfaction for the customers in availing public services.
II. Current StatusBased on the assessment study conducted during the formulation of the eGovernment Strategy, following observations need to be highlighted:
Ethiopian eGovernment Portal is already operational, albeit with limited functionality.
Government information portals for around 15 Entities including Ministries and other institutions have been hosted presently and still more are under development.
All regions and federal institutions are to develop and implement websites with basic level public service delivery information as per the existing policy of government. 69 websites have been developed for regional bureaus to make information accessible to the public.
A call centre has been established by MINISTRY OF COMMUNICATIONS & IT with participation of 4 government entities - Transport Authority, Addis Ababa Transport Branch Office; City Government of Addis Ababa, Land Administration; Document Authentication and Registration Office and Social Security Agency.
Three Services (weather forecast, currency exchange rates and Electricity) are likely to be provided through the mobile channel in the next 1 month.
92 ICT community centres have been established across the country. These centres are well equipped and could be leveraged as Common Services Centres (CSCs) in future.
PricewaterhouseCoopers
Page 138Confidential
Page 138
Channel strategy should support wider government policies on universal access, modernizing government and social inclusion.
Channel strategy should ensure social inclusion, providing coverage for the underprivileged and people with special needs for accessing services.
Channel strategy must ensure a “no wrong door policy” – citizens should be able to conduct different steps of the same transaction through different channels in a seamless manner.
The agencies should adopt channel strategies in a coordinated manner so as to leverage synergies and economies of scale to deliver integrated services in a cost effective manner.
Channel strategy should be focused towards providing clear benefits to both customers and agencies.
A coherent and clear Channel migration strategy must be implemented to promote uptake of new channels
Channel strategy should ensure integration – an applicant should be able to perform different steps for availing the service through different channels
III. Summary of the status of the different channels is as below –
Table 19: Channel – Current Status
Sr. No Channel Status
1 National Portal Portals for around 15 entities including Ministries and other institutions have been hosted presently and still more are under development.
Few Information services are present -27 Informational Services
Channel uptake has been very low
2 Call centre Four Agencies with around nine agents now providing information
Approx. 700 calls answered per day But there is more demand existing - around 4000
calls are attempted every day
3 ICT Service Centres
Approx. 92 existing ICT Community centres Set up by ICTAD
4 Mobile Under design Three Services (weather forecast, currency exchange
rate and electricity bill information are likely to be provided shortly
IV. Guiding Principles for Channels Strategy
PricewaterhouseCoopers
Page 139Confidential
Page 139
V. Recommendations and TargetsBased on the technological choices available today, readiness levels of participating organizations, customer preferences and an overwhelming preference of key decision makers for integrated service delivery, the following channels present themselves as viable alternatives for delivering government services alongside traditional government offices:
1. eGovernment Portal: where customers can use internet to request and avail services, search information, make payments, etc
2. Phone (Call Center): where customers can call up to request services and information and access the same through call center agents and ‘Interactive Voice Response’ technologies.
3. Mobile Gateway; where customers can request services and information through mobile phones and hand-held digital personal assistants. The departments can send customers regular alerts through SMS.
4. Common Service Centers (CSC): where services like Information dissemination, acceptance of service requests and delivery of services is provided to the customers at a single point of service delivery. CSC includes self-service kiosks, utility bill payment centers, ICT community centers etc. Furthermore, the Government in Ethiopia is about to commence implementation of the Unified Billing System (UBS) in a Public-Private Partnership (PPP) mode in Addis Ababa. This project will establish 70 billing centres (for payment of power, telephone & water bills, to begin with), with all required IT Infrastructure. These may be considered for upgradation as CSCs by facilitating delivery of all e-Services. It is also planned to expand the UBS project to more cities.
The options of the various channels and the factors of convenience and choice to the customers make it imperative to develop a comprehensively defined strategy for the enablement of service delivery channels. Each of these channels and their implementation plan is discussed in greater detail in the following pages.
PricewaterhouseCoopers
Page 140Confidential
Page 140
VI. e-Government PortalGovernment Portal is envisaged to be the primary electronic channel for providing eServices to the customers. There are several advantages that can accrue to the government through the use of eGovernment Portal as the primary service delivery channel.
PricewaterhouseCoopers
Page 141Confidential
Page 141
Implementation model• Existing “in-house” model for portal
management• Portal design based on customer
segments and life events
Outcomes• One stop-shop for all e-Services• Service improvement through
customer feedback
Critical Success Factors• Introduction of eServices as per the schedule • Content management processes for updating content• High uptime • Standards and policies for integration and security of data• Marketing and awareness campaign
The portal can be the integration point and a one stop shop for all government services. It can also act as a linkage between the other delivery channels.
User friendly – all services available at a single location for anywhere, anytime access.
The use of internet helps in reducing load on physical infrastructure of the government by reducing the need for customers to visit government offices.
It requires minimal human intervention and enables interactive service delivery.
Easier to remember 1 URL than a number of different URL’s for each department
Presents single face of the government
Leads to higher usage of web services as users of already existing services get information regarding new eServices while transacting
Internet is a cost effective and convenient means for providing information about services, rules and regulations etc.
Implementation Imperatives
Ethiopian eGovernment Portal is already operational, albeit with limited functionality. The Government of Ethiopia needs to consider the following implementation imperatives for further development of the eGovernment portal as a delivery channel for Government services:
Mandate a common look and feel for user interface for all government websites of Ethiopia
The enablement of services for online/ electronic delivery channels would require:
o Changes to departmental IT systems: The existing IT systems are designed to cater to the backend functioning of the departments only, hence would need modification for service delivery through the portal.
o Regulatory changes: The new process redesign for online delivery may also require changes to the regulations governing the service.
Well defined content management processes to ensure that the content published on the portal is relevant and up-to-date.
PricewaterhouseCoopers
Page 142Confidential
Page 142
Figure 20: e-Government Portal
A capable team and robust processes and systems for network and portal maintenance to ensure acceptable uptime and resolution of issues impacting services delivery 24*7.
A Monitoring and Evaluation framework for measuring the effectiveness of service delivery through the portal and to identify opportunities for further improvement.
Innovative measures such as Common Services Centers to ensure that the limitation of high cost of computer equipment and internet access does not result in low uptake of the portal.
Single Government portal can only be successful if it has the backing of all the ministries and agencies. Therefore, it is imperative that an inter-ministerial group is constituted to oversee portal development and maintenance
Marketing and awareness campaign for creating awareness regarding the benefits of availing services through the portal. This is extremely important – considering that presently the usage of the portal is very poor (approx. 1000 hits per month).
98% uptime of the portal and eServices should be ensured through stringent service levels.
Introduction of eServices as per the schedule to keep the momentum
Standards and policies for integration and security of data to facilitate delivery of services that span across ministries
Options Analysis
The various options available for enhancing the e-Government Portal along with their implications are as follows:
Table 20: e-Government Portal Implementation
Option Implication
In-house Portal Large up-front cost
Difficult to implement stringent service levels
Outsourced Portal Ownership of servers, data and basic project management team with government
Outsource development, operation and maintenance of the portal
Lower up-front cost and overheads
ASP Model (Vendor-managed)
Vendor gets paid based on the number of transactions
No extra capacity created
Recommendation
Currently Ethiopia’s e-Portal is managed in-house. Based on the current assessment of the existing portal and websites of various departments, it is suggested that
The government may continue with the “in-house portal” model in the immediate term (next one Year) with enhanced infrastructure to be able to provide eServices. However
PricewaterhouseCoopers
Page 143Confidential
Page 143
it needs to Outsource development & maintenance – keeping ownership with Government, so that the portal is able to provide all services – End to End, as they are developed.
Enhancement of Portal – to provide ‘End-to End’ delivery of identified 216 E-Services - including facilities of online authentication, digital signatures, payment, etc
Establish Governance Framework and portal management processes, to ensure continuous updation and improvement and provide more relevant content & facilities for online Citizen participation in Governance & development – this will help increase uptake of the channel
Consider options to allow private sector participation in the provision of related value-added services through the portal
Government should also consider options to allow private sector participation in the provision of related value-added services through the e-Government portal
As mentioned above Government should consider outsourcing the development & maintenance of the portal, while retaining ownership. This will help ensure that the development of the portal is able to simultaneously develop as the various projects of E-Government Strategy are implemented. The Vendor would be responsible for ensuring that the usability and technical capacity of the portal are up to date – while Government would focus on making different services available through this channel and the Governance and management processes, so that Content is always updated and is relevant to the needs of the different stakeholders.
It is proposed that the outsourced operations of the portal will commence by year 3. Total estimated cost for the portal is 29.06 Mil. Birr.
Outcomes
Ethiopia should drive the implementation of the eGovernment portal by taking into account of outcomes such as
E-Government portal to be the one-stop-shop for all Government services
All possible Government services to be delivered completely through the eGovernment Portal. Availability of services on portal should be in line with their implementation, which will make the following number of services available through the portal channel, over five years -:
o Year 1: 35
o Year 2: 73
o Year 3: 64
o Year 4: 30
o Year 5: 9
Visible enhancement in the customer experience and reduced cost of availing services
Reduction in per transaction cost for the Government
Provide 98% uptime for all online services
All informational services, downloadable forms, grievance redressal and status tracking for applications to be provided online.
PricewaterhouseCoopers
Page 144Confidential
Page 144
Online feedback mechanism to be established to facilitate participation of customers in improving the services delivery
PricewaterhouseCoopers
Page 145Confidential
Page 145
VII. Contact CenterA Contact Center can be an effective means of obtaining service related information, delivery of some services, and grievance redress. The call center provides the following advantages:
Figure 21: Contact Center
It provides an element of human interface to the process of information dissemination / complaints recording
It is a cost effective means to disseminate information to the customer in an interactive way.
It reduces the need for the citizens to visit the government office for information, thereby helping in reduction of the load on the physical infrastructure of the government departments.
Most inclusive alternate channel as telephone is much more pervasive than internet and the number of people who can use telephones is much higher than those that use internet. A testimony to this is the fact that the present call center with participation of only 4 ministries is attracting over 800 calls a day.
PricewaterhouseCoopers
Page 146Confidential
Page 146
Implementation model• Outsource Call Center operations to
third party• Outbound calls for targeted promotion
and push services
Outcomes• A single national toll free number for
all information services, status checks and complaints
Critical Success Factors• Bilingual support in English and Amharic• Adherence to service levels and Standard Operating Procedures• Integration with other channels especially the eGovernment portal• Marketing and awareness campaign
The record of all interactions with the customer can be maintained and analyzed for continuous improvement in service delivery.
It can be used as an outbound centre to promote specific government schemes to target customer segments and pro-actively provide information to the customers.
The Contact centre will essentially provide support for all government services. It shall serve as a first point of contact for most customers exploring alternate delivery channels. The call centre would also provide information on all government services with certain value added services like status checking, and grievance redressal for all services. The call centre is expected to provide multi-lingual support.
Implementation Imperatives
Following implementation imperatives need to be considered for the development of the Call centre as an effective delivery channel for Government services:
Learning’s from the in-house call center established at MINISTRY OF COMMUNICATIONS & IT must be documented and utilized for better performance.
Multilingual support in English, Amharic and identified regional languages must be provided.
Increasing capacity to meet growing demand
Adherence to service levels and Standard Operating Procedures.
Integration with other channels especially the e-Government portal
Marketing and awareness campaign to raise awareness regarding the existence of call center and benefits that accrue by using the channel for availing services.
Design the database of expected FAQ’s from customers on services to facilitate call center operations. These would need to be updated continually.
Design of efficient IVR system to resolve maximum queries through self-service by callers.
Implementation of a CRM analytics system for analyzing the calls received.
Options Analysis
The various options available for implementing the Call centre along with their implications are as follows:
PricewaterhouseCoopers
Page 147Confidential
Page 147
Option Implication
In-house Call centre
Large up-front investment
Hard to scale down in case up-take is weak
Maximum control of government and data security
Outsourced Call Centre
Servers, data, and basic project management team belongs to the government
Call centre infrastructure and operations by private party
Lower up-front cost
May take some time as call center industry is not very mature in Ethiopia
Vendor-managed Call centre (transaction-based payment)
Vendor gets paid based on number of calls handled
No extra capacity created
Least control of the government
Concerns over data privacy
Table 21: Contact Centre Implementation Options
Recommendation
Government of Ethiopia has set up an in-house government call center. Since the current set-up is very basic and not a full-fledged call center, it is suggested that as part of the e-Government strategy implementation, the government should establish an “Outsourced Call Center” to facilitate e-Services. This is further necessiated by the fact that the Call Centre channel requires expertise of different domains, including IT and Communications infrastructure, operations, human resource management and training and service delivery excellence. However a dedicated team to continuously monitor the service levels and lead further improvements in services delivery must be established. So Government should consider –
Implementing outsourced call centre model This channel would be able to provide 77 informational and around 40 transactional
services (estimate of 30% of the transactional services identified) The Call centre would also provide facilities for outgoing calls, emails, live chat,
integration (connecting to live databases of Ministries)
It is proposed that a 100 seat facility (including 80 agents and support staff), be established – which would take care of increased number of services as well as be able to serve calls from regions. Outsourced operations would start from year 3. Total estimated cost is at 164.57 Mil. Birr.
PricewaterhouseCoopers
Page 148Confidential
Page 148
Call centre outsourcing can be a PPP business model – wherein there would be toll-free service for services like information and transaction services like payments etc, may be through paid calls.
Private partner would be paid on number of calls and the services.
Outcomes
Desired outcomes of implementing the Call centre as a delivery channel are:
A single national toll free number for all information services, status checks and complaints with Multi-lingual (English, Amharic and popular regional languages) support.
The services rollout proposed through the call centre channel, over a period of 4 years is
o Year 1: 35
o Year 2: 42
o Year 3: 20
o Year 4: 20
Visible enhancement in the customer experience and reduced cost of availing services
Improvement in Service turnaround time
Proactive service delivery (push services) by leveraging the Call Center.
30% of grievance resolved on call and 90% resolution of all grievances received within 5 working days.
PricewaterhouseCoopers
Page 149Confidential
Page 149
VIII. Mobile Gateway Mobiles are used world-wide for providing Government service due to their high penetration. Some of the advantages of the mobile Gateway as a service delivery channel are:
A mobile gateway helps in providing services to customers on the move.
Reduction in cost of delivering and availing services.
Anytime, anywhere access to information and select public services
It reduces the need for the citizens to visit the Government office for information, thereby helping in reduction of the load on the physical infrastructure of the government departments.
The mobile penetration is increasing at a fast rate, so this channel is likely to become the most pervasive service delivery channel in the future.
Using the mobile gateway, a number of select services can be delivered such as:
Payment services;
Information services;
Currency converter;
Flight Information
Weather information
Status checks
Information regarding important / emergency numbers
Proactive delivery of services, i.e. push services (services such as intimation regarding renewal of licence which is due in future etc.).
The Government of Ethiopia has already awarded a pilot project for the enablement of 3 services (Currency rates, weather information and Electricity bill information).
Implementation model• Outsource Call Center operations to
third party• Outbound calls for targeted promotion
and push services
Outcomes• All informational, status checking
and payment services to be available through mobiles.
Critical Success Factors• Cooperation and support of the Ethiopian Telecommunication Company• Redesign of content and formatting for mobiles• Identification of services amenable for delivery through mobiles• Integration with other channels especially the eGovernment portal• Marketing and awareness campaign
Figure 22: Mobile Gateway
The high-level diagram below illustrates the different functions in end-to-end solutions of the various components of mobile middleware required to for delivering eGovernment services.
Table 22: Middleware required for Wireless Applications
Architectural Layer
Middleware Required
Tier 1 Device integration/drivers; Browsers
Tier 2 Wireless gateways
Tier 3 Web and wireless application servers; Wireless commerce servers
Tier 4 Enterprise application integration (via application connectors)
Implementation Imperatives
Following implementation imperatives need to be considered for the development of the mobile channel as an effective delivery channel for Government services:
Identification of services amenable for delivery through mobiles
Redesign of content and formatting for mobiles
Support and cooperation of Ethiopian Telecommunication Company (ETC) must be solicited.
Mobile interface / application connectors need to be developed for the e-Government Portal and applicable agency applications.
Cooper
Web Application
Server / Agency
Applications
Figure 23: Four tier Architecture for Wireless Application Delivery
Adherence to service levels and Standard Operating Procedures.
Integration with other channels especially the e-Government portal.
Marketing and awareness campaign to raise awareness regarding the existence of call center and benefits that accrue by using the channel for availing services.
Options Analysis
The various options available for implementing mobile gateway along with their implications are as follows:
Table 23: Mobile Gateway Implementation Options
Option Implication
In-house Mobile Gateway Large up-front cost
Difficult to implement stringent service levels
Lack of in-house expertise in government will require extensive recruitment for the purpose which may be time consuming
Maximum control and data privacy
Outsourced Mobile Gateway
Ownership of servers, data and basic project management team with government
Outsource development, operation and maintenance of Mobile Gateway
Lower up-front cost and overheads
Faster implementation
ASP model (vendor-managed)
Vendor gets paid based on number of transactions handled
No extra capacity created
WAP server and content converter provided by vendor
Integration effort also carried out by vendor
Fast implementation
Recommendation
It is recommended that the Government of Ethiopia should consider options of Outsourced Mobile gateway and ASP model (vendor managed) gateway for its services. This would involve
• Set-up of Mobile gateway and creation of content for the Mobile channel
• Provision of 77 informational services and around 40 transactional services
The business model option can be PPP implementation – with the private partner responsible for development & maintenance and payment would be based on number of transactions/uptake of the channel.
Cooper
It is proposed that outsourcing of the mobile channel commence from year 2 and the total estimated cost at 19.25 Mil. Birr
Cooper
Outcomes
Desired outcomes of implementing the mobile gateway are:
All payment services and services related to status queries of applications for availing services to be made available through mobile.
Availability of 77 informational and around 40 transactional services
The services rollout through the Mobile channel, over 4 years proposed is
o Year 2: 35
o Year 3: 42
o Year 4: 20
o Year 5: 20
Visible enhancement in the customer experience and reduced cost of availing services.
Wherever possible, proactive service delivery such as reminders for deadlines etc. to be enabled through mobiles.
At a later stage, services such as mobile parking solutions in busy areas to be introduced.
Cooper
IX. Common Service CenterCommon Service centers would facilitate single window multiple services delivery. This means that Common service centers though similar to departmental counters, would provide services of multiple departments. Key drivers for Common Service Centres are:
Customer Preference for human interaction
Some government services may require manual signatures on documents
A wide array of services of multiple departments could be provided to customers from a single point
Common Service Centres are an inclusive means of service delivery as service delivery is not dependent on technology requirements, and technical knowledge on part of the customer is not required.
Further, the CSC transcend the problem of low literacy and low PC and internet penetration by leveraging ICT to reach the masses and also providing a human interface to facilitate the delivery of services.
Ethiopia has successfully implemented fully functional 65 ICT community Centres that cover nearly 95% of the country’s population. These Centres along with the Unified Billing Centres could be utilized for delivery of eServices.
Common Service Centers (CSC) can either be set up at existing government premises (government agency counters) or other locations such as the ICT Community Centers and Unified Billing Centers.
CSC shall provide all portal based services and other services requiring physical presence.
It would also provide payment related services, along with form distribution and submission for all government services.
For customers who do not have Internet access, there would be an information help desk for assistance, and self-service (or facilitated) kiosks for accessing the Internet to avail government services.
Cooper
Implementation model• Leverage existing ICT Community
Centres and proposed Unified Billing Centres as CSCs
Outcomes• Single window multiple service
delivery• All government services to be
available in the locality
Critical Success Factors• Training of staff at the CSCs• Authority and empowerment of the staff at the CSCs• Integration with other channels especially the eGovernment portal• Adherence to Service levels and standard operating procedures• Marketing and awareness campaign
Figure 24: Common Service Center
Implementation Imperatives
Some of the implementation imperatives for successfully setting up CSCs as service delivery channels are:
Framing processes and guidelines to facilitate the delivery of departmental services through CSCs including
o Process design, including clearly laid out roles and responsibilities for the people involved
o Identification of process owner
o Changes/upgrade in department IT systems
o Design and monitoring of SLAs, along with escalation and problem resolution in case of breach
Utilizing 92 existing ICT Community Centers and the proposed 40+ Unified Billing Centers for offering government services
Customer orientation training and functional training regarding the services to staff at the CSCs
Monitoring and Evaluation framework for measuring effectiveness of service delivery
Recommendation
It is recommended that the 92 existing ICT Community Centres and the proposed 40+ Unified Billing Centres are leveraged as CSCs for offering government services immediately.
The number of CSCs needs to be increased as per the demand for services across the country and also to facilitate easy access to government information and services even in interior and remote areas, in the longer run.
It is recommended that additional 800 CSCs be set up in Partnership with the private sector on a PPP business model. This would cover all the Woredas in the country. Spreading the CSCs till Kebele level could subsequently be taken up by respective regions, based on need and demand.
The CSCs would charge transaction charges for services availed by citizens – which would not only include Government services but also others like photocopy, basic DTP services, etc.
However it may be expected that around 50 % of the CSCs could be self-sustainable, in terms of being able to meet operational expenditure and recover capital investment to some extent. Remaining CSCs may need provision of subsidy and support from Government, in order to be viable.
It is estimated that an investment of approx. 2206.21 Mil. Birr would be needed over a period of five years for the CSC project. However, the project is expected to start only from Year 2 on PPP model – after required tendering and finalisation.
Broad level estimate at this stage, of the support needed from Government would be around 50% of the investment i.e. 2206.21/2 = 1103.11 Mil.Birr. The remaining investment is proposed to be provided by the private partner.
Outcomes
Cooper
Government of Ethiopia should drive implementation of Common Service Centers by taking into account outcomes such as:
CSC to offer service of all government departments
Availability of services through CSCs would be in line with availability on National Portal, which will make the following number of services available through the portal channel, over five years -:
o Year 1: 35
o Year 2: 73
o Year 3: 64
o Year 4: 30
o Year 5: 9
Visible enhancement in the customer experience and reduced cost of availing services
No need for citizens to visit departments for services related to submitting applications, making payments, requests for duplicates, etc and to be provided from CSC
All services offered through the portal to be available at the CSC
Defined and published service levels for all services to be delivered through CSC
Self-service kiosks also to be established
ISO certification for processes at Common Service Centers
X. Channel Migration StrategyThe introduction of alternate channels needs to be augmented with channel migration initiatives to increase the uptake of electronic channels. Some of the recommended initiatives towards this end are:
Promotion of benefits of eServices: To promote uptake, it is essential to educate customers of the benefits of using the e-Services. The customers would use the new channels if there is a perceptible advantage to them in terms of cost, time or convenience. Hence, specific campaigns to highlight advantages of availing services through alternate channels should be conducted.
Targeted promotion of service: The Government can identify specific high-value services for targeted utilization improvement.
Incentives such as Differential pricing and faster turnaround times: Financial incentives including lesser fees for availing services through electronic channels could be useful incentives for promoting usage of electronic channels. Similarly, turnaround time for services demanded electronically could be reduced as compared to the services demanded through conventional channels to provide incentives to the early adopters.
Adding value through information and expertise: Government needs to focus on ‘pulling’ customers to more efficient channels by making the informational services more useful and attractive.
Possible compulsion for channel shift: Government has the option of implementing compulsory channel shift, focusing initially on the more sophisticated audiences of business and intermediaries. One of the ways of compelling the users for channel shift is to offer some services exclusively through the electronic channels. This is one of the most difficult ways of implementing channel shift, but provides maximum benefit as
Cooper
closure of inefficient channels results in savings and enhanced efficiency for the Government.
Cooper
PricewaterhouseCoopers Page 159
ConfidentialhouseCooouseCooper
Section 5 – STRATEGIC PRIORITY 3 – ENABLERS
D
Development of e-Government Strategy and Implementation Plan
VI. Strategic Dimension 3 - Enablers
I. Capacity BuildingE-Government projects are not equivalent to conventional IT projects. The focus of the e-Government strategy is on service, service levels and sustainability; not on software and hardware. Capacity building seeks to address the skill gaps in the current system and people. Capacity building in the context of this strategy refers to the need to adjust policies and regulations, to strengthen institutions, to modify working procedures and coordination mechanisms, to enhance the skills and qualifications of people, to change value systems and attitudes in a way that meets the demands and prerequisites of implementing the eGovernment strategy.
The adjacent figure depicts the journey towards developing a Capacity Building Strategy for Ethiopia. The Strategy emphasizes the need to not only strategize in terms of identifying and developing CB initiatives but also to sustain the capacity that has been developed. A structured Capacity Building framework has been developed as part of the Strategy. The report presents in detail this framework and each of its components. It also lists down the Capacity Building initiatives in each component and how they contribute to achieving objectives laid down for this objective area.
Summary of the Current Capacity Building Initiatives undertaken
Ethiopia in the past few years has undertaken significant Capacity Building initiatives such as
Technical Vocational Education Training (TVET) centers have been created and around 576 teachers have been trained on ICT to effectively deliver education to students. Around 15 ICT training labs in all the regions have been established for providing training to the TVET teachers.
Four Business Incubation Centers to help entrepreneurs’ in ICT related businesses has been established. A total of 43 private ICT start-ups have entered into business under these established centers. In addition 18 Virtual Incubation in Addis Ababa have been established to support the ICT start-ups and create business opportunities.
645 SME operators have been trained on computer maintenance, basics of computing and database by training institutions such as FEMSEDA and PIC.
The ICT Centre of Excellence has been established in Addis Ababa University for research and development of ICT solutions.
Computer Refurbishment and Training Center (CRTC) has been established to provide hands on training on computer refurbishment and technical and business
PricewaterhouseCoopers Page 160Confidential
Figure 25: Capacity Building
D
Development of e-Government Strategy and Implementation Plan
training. The key activity included refurbishing donated computers to provide affordable computers to schools, health centers and communities.
Training to the Experts: 931 members trained in basic IT skill, 203 members trained in Interactive and Dynamic Webpage Development, 1180 members trained in Advanced Network Management, 103 in IT Security, 80 in IT Security & Cyber crime, 100 members trained in Business (IT) Continuity and Disaster Recovery, 60 members trained in C# with dot.net Frame work, 33 in CCSP, 112 members trained in Database Management.
Seven Community Radios have been implemented and operationalized which helps in information dissemination and Capacity Building in rural communities.
Some of the improvement opportunities identified during the assessment study include:
Almost all the ministries and agencies acknowledge that the biggest challenge to implement e-Government in Ethiopia is the non-availability of the technical manpower and Capacity Building
Lack of established communication between all the Capacity Building organizations for monitoring and evaluating the Capacity Building programs
Limited number of IT professionals to support Ministries/Agencies in future plans and initiatives
Lack of qualified employees and technical experts (the education and experience of some of the IT personnel are not relevant)
Capacity Building Objectives
Objectives identified for IT Capacity Building are:
Create appreciation and understanding of eGovernment projects amongst the decision makers
Increased computer literacy among Government staff
Re-orientation of the government staff to focus on customer service delivery
Enhancement in capacities of the ministries to undertake e-Government Projects
Development of skill sets amongst customers
Effective government wide knowledge sharing and coordination
Change Management Plan
Framework for Capacity Building
The Capacity building initiative for the e-Government program should work towards the following:
1. Enhancement of required skills within the government to implement and run e-Government program
2. Development of skill sets amongst customers
The Strategy for accomplishing the above is enunciated below
PricewaterhouseCoopers Page 161Confidential
D
Development of e-Government Strategy and Implementation Plan
Enhancement of required skills within the Government
This will be accomplished through the following initiatives:
Initiative 1: Creation of Information Technology Services Group
Initiative 2: Training Needs Assessment and Preparation of Training curriculum
Initiative 3: Strengthening of IT Training Infrastructure including development of a Knowledge Management Portal and e-learning facilities
Initiative 4: Conduct Seminars, workshops and study tours
Initiative 5: Standardization of structure of IT Department across the Ministries and Agencies – for smooth & effective implementation of the priority projects.
Initiative 6: Incentivize employees to build capacity
Initiative 7: Establishment of Common Data Terminals (CDTs) in each Ministry/Agencies
Initiative 1: Creation of Information Technology Services Group
Our experience shows that governments across the world face the following issues in retaining talented IT staff due to the following reasons:
IT directorates / divisions within ministries are too small to offer any career path to IT professionals
As IT divisions are small, even minor attrition has a high impact. Reactive hiring to fill up the resource gap leads to compromise in quality of new staff.
Due to small IT staff size within ministries, available skill sets are not diverse, as a result evaluating and working on diverse technologies and solutions is difficult.
Pay scales of trained IT staff in government are perceived as low as compared to prevailing rates for IT professionals in the private sector
Some of the highly qualified staff such as software architects are either too expensive for the ministries to afford or even if they hire them, they are unable to utilize their services to the fullest as the amount of work a typical IT department handles only requires such specialized expertise sporadically.
In order to overcome these difficulties, a recommended course of action is the establishment of a government wide Information Technology Services Group (ITSG) to create a pool of IT resources available for all the government organizations on a need basis. Such an agency would be the responsible for central repository and exchange of all systems and software, would recommend and monitor external IT contracts, develop IT curricula and training models for use throughout government and provide a knowledge base for all IT needs linked to a central knowledge management repository. The detailed structure of ITSG is provided in Section-3 Governance structure. The existing Human Resource Development, Capacity Building, Research and Consultancy Directorate should be enhanced to provide support as envisaged from the ITSG group
PricewaterhouseCoopers Page 162Confidential
D
Development of e-Government Strategy and Implementation Plan
Following benefits will be realized through the ITSG (as depicted in Fig 13):
Capacity Balancer: ITSG would act as a capacity balancer for Ministries at different stages of IT maturity. While some Ministries may not require any outside support, others might require additional IT resources to accomplish time bound projects. ITSG would help the Ministries that need additional support through the provisioning of resources for completion of the IT projects undertaken by them.
Focus on outcomes and timelines: As the ITSG staff will be deployed in any Ministry/Agencies for a fixed time to complete a project; there would be a higher focus to complete the projects on time.
Better staff retention and career planning: The size of the proposed ITSG will be large enough to provide a defined career path and growth opportunities to IT resources. Though the IT resources could work on projects in different Ministries / departments, they would report to the managers in the ITSG and have a deeper career path in the ITSG.
Diverse skill sets: Due to the aggregation of resources, diverse skills sets would be available within the ITSG to undertake projects. This will enable the group to use most appropriate people and technologies to provide solutions.
There are three options for the organizational set up of the proposed ITSG:
Table 24: Analysis of Options for ITSG
Analysis of Options for setting up ITSG
Options Positive Negative
Option 1: Established as part of MOCIT
This option is the quickest way for establishing the group, as some of the IT staff from various Ministries may be deputed to the group.
However the issue of attrition due to lower wages than the market may not be addressed through this option.
Option 2: Incorporation as a separate company wholly/partially owned and controlled by the government
This option will allow private participation in provisioning IT human resources without relinquishing the control of the Government. This option will facilitate the linking of salaries to market rates and bring in higher efficiencies and productivity associated with the private sector.
This will however, tie up the government with a private partner who may get an opportunity to cast undue influence over the e-Government programme.
PricewaterhouseCoopers Page 163Confidential
Figure 26: ITSG
D
Development of e-Government Strategy and Implementation Plan
Option 3: Outsourcing to private sector with the IT staff of the government being transferred to the private partner’s payrolls
This option will allow the Government to cap its IT Human Resource expenditure and define strict service level criteria while also making the Government leaner.
This option would be the most difficult to implement due to various reasons such as lack of availability of private players in the local market, resistance from Ministries / employees against outsourcing.
Based upon the analysis of the options and current circumstances, option 2 appears to the preferred option. The broad modalities for implementing the concept are as follows:
Resources: - To initiate the project, a group of 1-2 resources from each Ministry/Agencies will be identified. It is expected that over a period of time 100+ resources across the three levels (project managers, IT managers and analyst) and multiple skills (technical platforms, change management, project management, vendor management, etc) will be required. For expanding the ITSG, a private sector company can be hired to provide IT resources. The following table provides the advantages and disadvantages of directly engaging and outsourcing it to a private sector company.
PricewaterhouseCoopers Page 164Confidential
D
Development of e-Government Strategy and Implementation Plan
Table 25: Outsourced vs. Individual Recruitments
Individual Recruitments Outsourced Agency
Advantages
Cost Effective Ensures availability at all times
Cuts down the time required for following the procedures of recruitment
One stop solution
Saves time and effort
Disadvantages
Risk of attrition
Delays in recruitment
Risk of not finding the right manpower
Comparatively higher cost
Funding: - A small budget for setting up of the ITSG and its core team will be required. The operation cost of the group would be centrally funded on behalf of Ministry/Agency depending on the IT projects.
Management: - The ITSG will be managed by Programme Management Office (PMO) being set up as a separate initiative under e-Government directorate of MoC&IT
Initiative 2: Training Need Assessment and Preparation of Training curriculum
For the successful implementation of the e-Government program, it is imperative to ensure that the government employees are provided training so as to re-orient them for customer centric service delivery and educate them to utilize ICT for delivering the envisaged benefits to customers. An indicative list of training areas is provided below:
Technology Management Project Management Change Management (including process reforms) Financial Management Soft Skills
However, it is imperative that a comprehensive training needs assessment exercise is undertaken to ensure that suitable course curriculum is designed. In this regard, owing to the different needs of officials at different positions / levels in the government hierarchy it is recommended that officials with similar duties / requirements are clubbed together for training purposes. The various Target Groups for training purposes are:
Table 26: Target Groups for Training
Groups Responsibilities
Group A Leadership( Ministers and DGs)
Group B Directors
PricewaterhouseCoopers Page 165Confidential
D
Development of e-Government Strategy and Implementation Plan
Group C Senior Experts
Group D Middle and Junior Level experts
Group E Support Functions Staff
Group F Clerical Staff
Group G Custodian Services
The training needs of these groups will be aligned to specific training areas and courses. A sample of the same is provided as part of Annexure III.
The Training Needs Assessment aims to elicit the views of the target groups (Ethiopia employees at various levels) addressing the capacity requirement of handling IT implementation in their own functional domain. It also focuses on addressing the general skill levels and educational background of the target groups. The TNA is to be administered across Ministries at every level. The nodal agency to drive this will be MOCIT.
Training Need Assessment will provide inputs for preparation of training curriculum as well. Training courses will be identified for the training areas used in assessing the employees. We feel to cater to different levels of Government staff the training should be offered at three levels. The training levels are described as in the following table:
Table 27: Training Levels
Basic Level The basic level courses would enable the participants to gain an Understanding of the concepts and issues related to the topic
It would create an awareness of the range of possible approaches and able to do the task in a simple environment, or with supervision
Intermediate Level The intermediate level courses would enable the participant to undertake the task in a medium complexity environment.
It would also enable decision making and choose an approach where several approaches are available.
Advanced Level
1.1.1
The advanced level courses would enable the participant an in-depth understanding of the topic; it would enable training and managing others performing the task
It would enable application of the learning in a complex environment;
Advanced level may count towards professional or academic qualifications (to be arranged with higher/further education institutions).
PricewaterhouseCoopers Page 166Confidential
D
Development of e-Government Strategy and Implementation Plan
The training courses for each of the levels are provided in Annexure III. 15 ICT training labs in all the regions /Private Training Institutions/COE can refer to this course list and supporting course content may be provided to implement a comprehensive training program for Government employees of Ethiopia.
Initiative 3: Strengthening of IT Training Infrastructure
Development of the Ethiopian Government Knowledge Management Portal
Ethiopian Government Knowledge Management Portal accessible to all employees through Woreda-net should be established within the first year of strategy implementation. It is envisaged that this portal will act as a one stop repository for documentation of different initiatives across the e-Government program to facilitate dissemination and sharing of knowledge in the form of learning’s and good practices. This is expected to facilitate faster implementation while preventing wastage of effort and resources on reinventing the wheel.
Towards this end, a Knowledge Management database needs to be developed to store all the information and be accessible through the Knowledge Management portal. This would help in the creation of the initial database but for the sustainability of this initiative and to increase its usefulness it is imperative that the employees are encouraged to share their learning on the portal and utilize others’ learning while working on new projects. eLearning modules would also be developed as part of this initiative so that the government employees can take up online learning at a time of their choice without compromising on their allocated duties and responsibilities. The PMO being set-up as part of the e-Government strategy will assist in defining the contours of this portal.
Enhancing the existing Regional Training Labs
The Regional ICT labs need to be equipped to train the employees in the courses provided in Annexure III. It is imperative to ensure that adequate facilities and infrastructure is created to provide practical hands on training at these labs as well as online training for government employees at remote locations.
Tie-up with the ICT community centers
The Community ICT Centers across different regions could also be mandated to provide training to the employees in the regions. A tie up between MOCIT and the ICT community centers should be established to provide training to the Government employees in the region. A business model should be established for long term sustainability of such trainings through the ICT centers.
Partnering with Private Training Institutes
Partnership with Private Training institutes is meant to tap the availability of physical infrastructure and other resources at these institutes. Another important dimension for IT Training is the access to the pool of specialized IT Training experts at Partner Private Training Institutes. To start the initiative, a list of all private Training Institutes operating in the region will be prepared and a study will be conducted to find out their ability to provide training to Ethiopia staff.
PricewaterhouseCoopers Page 167Confidential
D
Development of e-Government Strategy and Implementation Plan
Initiative 4: Conduct workshops, seminars and study tours
Organization of Seminars and Workshops
Organization of Seminars and Workshops will enable the knowledge and Skills transfer to a large number of Government employees in shorter period of time. This will also bring a group of experts from diverse experiences sharing them with a group of participants with different roles on a same platform. The content of these seminars and workshops in form of audio, video and printed material will be shared on knowledge gateway.
As part of this initiative, it is proposed to conduct two seminars each year that will include key-note address by 3 speakers on different emerging technologies across the globe. The seminar will also include panel discussion on these emerging technologies where Government officials will get a chance to interact with elite technology experts from across the globe and gain valuable experience.
In addition to these seminars, it is also proposed to conduct two workshops each year where leaders from elite global IT corporations will create awareness amongst the CIOs and CTOs of all Ethiopia Ministries about new technology trends that will enable in improving efficiency of IT functions in their respective Ministries.
These seminars and workshops will support various IT initiatives in the region and help in creating a knowledge management system and culture. They will not only enable sharing of information and content but also create awareness amongst Ethiopia Ministries and its employees.
Study tours and exchange programmes for the government employees
Our experience suggests that Study tours and exchange programmes for senior government officials play an effective role in facilitating a mindset change and to illustrate the fruits of success of the e-Government program thereby building buy-in for the program.
It is proposed to select 5 senior Government officials every year for study tours and exchange programmes that will spend a specified amount of time either with the Government of another country or attend relevant courses at reputed places such as the Kennedy school of government, National School of government etc. Such programs are also useful in building networks with other organizations to bring good practices and leading technologies to Ethiopia.
Besides visits to leading countries and schools by Ethiopian government functionaries, foreign experts could also be invited to visit Ethiopia to work on specific assignments on various IT initiatives in Ethiopia. The idea here is two-fold: one to gain access to the knowledge of foreign experts in the short term and second to develop skills and expertise amongst the Government staff which will act as a building block for long term implementation of IT initiatives in the Ethiopia
Initiative 5: Standardization of structure of IT Department across the Ministries and Agencies – for smooth & effective implementation of the priority projects.
For the effective implementation of the E-Government Strategy, it is important that a minimum capacity be available, created in the various ministries and agencies. Further, a common organization structure should also be prevalent across Ministries and agencies to
PricewaterhouseCoopers Page 168Confidential
D
Development of e-Government Strategy and Implementation Plan
facilitate smooth interaction and coordination during implementation and monitoring of the priority projects. The recommended organization structure is provided in the Governance Structure section of this document in section 3.
Initiative 6: Incentivise employees to build capacity
Encouragement to take up certification courses
Employees will be encouraged to augment their skills through third party certifications such as a Microsoft certified systems engineer, a Cisco certified network associate, and a project management professional etc. The encouragement will be in the form of leaves for preparation of exams, payment of examination fees provided the employee clears the exam or any other support that can be provided by the Ministry/Agencies.
These certifications can be made mandatory for some promotions so as to encourage employees willing to undertake certification courses. In addition to certifications they can be rewarded by their Ministry/Agencies on excellent performance in the exams leading to certifications. However, to keep checks and balances in place, a two member committee will be set up comprising of 1 representative each from the Ministry/Agencies concerned and the MINISTRY OF COMMUNICATIONS & IT that will evaluate the need of the certification for running the business of the Ministry/Agencies and future growth of employee in the Ministry/Agencies in order to avoid any misuse of this policy by the government staff.
Encouragement to get trained on various courses provided by IT Academy
Letter of recommendations for promotions and salary increments will be linked to successful completion of Trainings and also to employees who perform exceptionally well in IT training.
Letter of recommendation will be on following lines:
Best performer of the year in all IT training courses – Recommendation Letter by Prime Minister
Maximum number of credits through IT training courses in a year – Recommendation Letter by the Minister
Best Performer for each Ministry/Agencies – Recommendation Letter by DG
Best Performer of each sub-Ministry/Agencies – Recommendation Letter by IT head
Encouragement to become Trainers
High performing individuals will be provided an opportunity to take up Training of Trainer courses with special benefits from their Ministry/Agencies. They will become Training Champions in their own Ministry/Agencies and provide training to as many employees as possible. Such individuals will be eligible for Recommendation from Minister / Prime Minister and also for out of turn promotions in exceptional cases.
Encouragement to take up eLearning modules
PricewaterhouseCoopers Page 169Confidential
D
Development of e-Government Strategy and Implementation Plan
The employees will be encouraged to take up eLearning modules for training where they don’t have to attend classes and can take up online assessment at designated evaluation centres to complete training and earn credits for various courses.
Initiative 6: Establishment of Common Data Terminals (CDTs) in each Ministry/Agencies
Self-service data terminals will be set up at all the Ministries to promote usage of Technology and familiarity with Computer Systems. This will enable the government staff to learn the use of systems and build awareness amongst them about computer literacy. These data terminals will be used by government employees who do not require computer use in their day to day functioning but would like to get familiar and acquainted with IT environment.
These Data Terminals will be operated and run by an outsourced private company. This company will set up a small training centre in each Ministry/Agencies which will be responsible for training Ministry/Agencies staff to become end users of these common data terminals. The training managed by the outsourced private company will be paid based on successful completion (PPP). Provided in Table below is a indicative list of companies who can provide training to government staff in the Ethiopia Ministries
List of Companies (Illustrative only)
S.No. Name of the Company
1 Microsoft
2 IBM Corporation
5 Learning Tree
6 Microlearning
Development of skill sets amongst customers
This will be accomplished through the following initiatives:
Initiative 1: Promotion of ICT education and e-Government in Schools
Initiative 2: Marketing and awareness campaign
Initiative 3: Targeted training of businesses
Initiative 1: Promotion of ICT Education and e-Government in Schools
The course curriculum in schools must have modules on ICT education and e-Government. As Ethiopia has a high proportion of its population in schools, this is the most sustainable way of creating capacities amongst the customers. Moreover, children can help their parents in not only accessing services but also in informing them of the introduction of new services. It must be ensured that every school has Internet access facilities for children.
Initiative 2: Targeted Training for Businesses
PricewaterhouseCoopers Page 170Confidential
D
Development of e-Government Strategy and Implementation Plan
Ethiopia has a high number of small and medium scale enterprises which may not have the resources to train the staff in using online services, e-Procurement etc., It is therefore critical to run elaborate training programs that will create awareness and capability amongst the businesses in using e-Services and electronic channels. This will also make the industry in the country more competitive.
PricewaterhouseCoopers Page 171Confidential
D
Development of e-Government Strategy and Implementation Plan
II. Monitoring and EvaluationThe Government would need to keep a track on the progress and assure all stakeholders that the Government’s time and financial resources are being spent in an optimal manner. Taking into account the unique challenges of e-Government services from their delivery modes and expectations perspectives, new performance measures need to be developed to provide accountability for various e-Government efforts.
The Monitoring and Evaluation (M&E) mechanism must not only provide information about the performance of Government policies, programs and projects. It must be able to identify what works, what does not, and the reasons why. The real value of Monitoring and Evaluation doesn’t come from just conducting this exercise but from using the results of this exercise to improve performance of the e-Government program.
The objective of the M&E framework is to enhance the effectiveness of the e-Government strategy by establishing clear metrics to measures the success of the e-Government initiatives in delivering services to its stakeholders.
The advantage resulting from the e-Government monitoring and evaluation is:
e-Government initiatives, most of the times lead to change in the process and delivery modes for the service, hence it is essential to develop new performance measures for e-Government programs
The e-Government programs also require significant investment from Government. Some of these cannot be measured in simple financial terms and need to be evaluated on such parameters
o Improvement of service standards,
o Increase satisfaction level of stakeholders
o Increased authenticity and security of information
Provide supporting evidence in policy making in the context of defining Government priorities amongst the competing demands from citizens and society
Enhance transparency and support accountability relationships within and outside the Government
Recommendation
Implementation of the monitoring & evaluation framework will include
1. Establishment of the PMO to monitor the Programme implementation
2. Development and implementation of a Programme Monitoring Tool
3. Implementation of M & E framework by PMO consisting of:
• Project progress tracking measures
• Benefits measurement
• Impact assessment
4. Implementation of Government Transformation Index (GTI)
5. Implementation of Customer Satisfaction Index (CSI)
PricewaterhouseCoopers Page 172Confidential
D
Development of e-Government Strategy and Implementation Plan
The Monitoring and Evaluation framework essentially has four components and the above mentioned measures will facilitate the monitoring of the E-Government Strategy implementation through -
1. Monitoring physical progress of the projects
2. Monitoring financial progress of the projects
3. Monitoring and evaluating the program outputs
4. Assessing impact of the program
Component 1: Monitoring physical progress of the project
Physical progress of the project will be tracked based upon implementation status of the project. Based upon the current status of the project, indicators are required to be defined for tracking the progress of the project in a particular stage. The indicators for the various stages along with a conformance index would be defined to track the progress of the projects.
The e-Government Project stages broadly include:
1. Conceptualization stage: During this stage, project description document for the project is under preparation. Indicators include:
a. Conducting requirement analysis for the project
b. Identifying a project leader and a team
c. Identifying services to be covered
d. Conducting stakeholder analysis
e. Risks and issues envisaged and a mitigation plan to address the same
2. Design and Approval Stage: After the project description document has been prepared and Request for Proposal (RFP) for vendor selection has been released, the progress milestones for tracking progress would include:
a. Appointment of an implementing agency
b. Definition of core services and service levels
c. Definition of target customer base
d. Appointment of a project leader and a team
e. Formulation of a plan for process re-engineering, if required
f. Formal approval of the project
3. Pilot and Implementation Stage: In this stage, the Project design would have been approved and the funds released for implementation. The project tracking would be performed on meeting the following milestones.
a. Status of Government Process Re-engineering
b. Channel coverage
c. Appointment of external vendor
PricewaterhouseCoopers Page 173Confidential
D
Development of e-Government Strategy and Implementation Plan
d. Key milestones definition and adherence to them
e. Integration with other agencies/projects
f. Technology architecture
g. Adherence to defined standards and policies
h. Capacity Building plan and roadmap
Component 2: Monitoring the financial progress of the project
Measuring the financial progress of the projects is an essential component of the monitoring and evaluation framework. The key indicators identified for tracking the financial progress include:
Total financial outlay of the project
Total funds disbursed till date
Expenditure incurred till date
Committed expenses
Yearly allocation of funds
Yearly expenditure
Total percentage of funds utilized
Additional funds required
Component 3: Monitoring and evaluating the program outputs
Overall program outputs/outcomes would be measured along the parameters as envisaged in the e-Government vision for the project. The indicators definition would be one of the key components of the program design.
Component 4: Assessing impact of the program
Since feedback of the customers is essential for effective implementation of the Monitoring and Evaluation framework and also for facilitating in mid-course correction steps, the Monitoring and Evaluation framework proposes to measure customer satisfaction levels every year to provide recommendations for improvement. This will also enable the Government of Ethiopia in assessing the incremental improvements in services delivery and perceptions of the customer base as a result of the e-Government initiatives.
This would include the following:
Customer satisfaction surveys
Report on the uptake of the envisaged services in the project
Outcomes
The following are the broad expected outcomes from the Monitoring and evaluation exercise.
Quarterly user satisfaction survey on e-Services( Scope of work for an external agency to conduct baseline survey is provided in Annexure XII)
Monthly reports tracking project implementation
PricewaterhouseCoopers Page 174Confidential
D
Development of e-Government Strategy and Implementation Plan
Monthly reports tracking citizen usage of electronic channels to interact with the Government
100% of projects to identify KPI/KPO as part of project design and parameters for measuring success
100% of projects to be evaluated against KPI/KPO by independent agency
Award for e-Government programs in Ethiopia, instituted for departments/ individuals
PricewaterhouseCoopers Page 175Confidential
D
Development of e-Government Strategy and Implementation Plan
Monitoring and Evaluation – GTI and CSI
Government Transformation Index
Detailed methodology for calculation of Government transformation index is provided below:
Table 28: Government transformation index: key indicators
S. No. Overall government transformation index
(Assuming the maximum score to be 1000)
Rating Final score
1. Efficiency of service delivery H1 122
a. Increase in number of transactions handled H 47
b. Reduction in pending/backlog cases H 47
c. Integrated services provided to customers M 28
2. Quality of services provided H1 122
a. Accuracy of reports H 47
b. Relevant services provided to customers H 47
c. Reduction of redundant information in application forms
M 28
3. Increase in the capacity of the Government officials (awareness, knowledge, satisfaction)
H1 122
a. Increase in the awareness of the eGovernment initiatives
H 55
b. Increase in the ICT usage of the officials H 55
c. Number of trained officials L 11
4. Grievance redressal system M1 73
a. Redressal of grievances within the defined service levels
H 37
b. Measures taken to prevent high frequency grievances
H 37
5. Accountability and reliability H1 122
a. Presence of audit trail activities M 33
b. Status tracking mechanism H 55
c. Ability to identify the owner of an activity / result
M 33
6. Capacity to deliver services H1 122
PricewaterhouseCoopers Page 176Confidential
D
Development of e-Government Strategy and Implementation Plan
a. eGovernment portal H 47
b. Number of common service centres H 47
c. Number of additional alternate channels created for delivering services
M 28
7. Digitization of the Government operations H1 122
a. Degree of data digitization of manual records M 61
b. Process reforms to deliver services through the computerized system
M 61
8. Responsiveness M1 73
a. Timeliness of delivery of services H 46
b. Availability of MIS reports for decision making M 27
9. Private sector participation H1 122
a. PPP models established for delivery of services H 68
b. Number of private services delivery through CSCs
M 41
c. Total number of services which are currently being delivered by PPP operators
L 14
Note:
For the top-level parameters, the three ratings are H1 for high, M1 for medium and L1 for low
For the parameters, the three ratings are H for high, M for medium and L for low
The weights are indicative and have been assigned based on our experience of conducting similar exercises in the past with various Governments and Government agencies
Maximum score is 1000
PricewaterhouseCoopers Page 177Confidential
D
Development of e-Government Strategy and Implementation Plan
Customer Satisfaction Index
Detailed Methodology for calculation of customer satisfaction index is given in Table 50
Table 29: Customer satisfaction index: key indicators
S. No.
Overall customer satisfaction Index
(Assuming the maximum score to be 1000)
Rating
Final score
1. Awareness about the availability of eServices H1 119
a. Awareness of the e-Government portal, common service centres and other new delivery channels
H 40
b. Extent of the customer awareness programmes H 40
c. Awareness of the customers about the online services H 40
2. Ease of accessibility of Government services H1 119
a. Adequacy of the number of delivery centres on which information is available
M 32
b. Location of service touch points H 54
c. Reduction of redundant information in the application forms M 32
3. Usage of eServices H1 119
a. Number of transactions by the users on the alternate channels
H 74
b. Number of visits for information versus transaction services M 45
4. Time savings of the customers for using eServices M1 71
a. Reduction in time taken to deliver the services H 27
b. Reduction the number of visits to avail the services H 27
c. Reduction in travel time in availing services M 16
5. Cost savings of the customers for using eServices H1 119
a. Cost of transactions for using services online versus offline H 74
b. Satisfaction with fee given for availing the services M 45
6. Quality of services - informational and transactional H1 119
a. Number of visits reduced to the agency counters H 46
b. Quality of helpdesk and telephonic support M 27
c. Hassle free mechanism for payment H 46
7. Relevance of services to the customers M1 71
a. Satisfaction with range of services provided H 45
PricewaterhouseCoopers Page 178Confidential
D
Development of e-Government Strategy and Implementation Plan
b. Relevance of information asked for in application form(s) M 27
8. Effectiveness of grievance redressal mechanism H1 119
a. Reduction in time taken for resolution of grievance H 46
b. Grievance redressal within the service levels H 46
c. Satisfaction of the quality of the grievance responses M 27
9. Ease of usage of the system M1 71
a. Services provided in Arabic and English L 5
b. Ease of navigation (number of 'clicks' required) M 16
c. Security of interface/ data transfer H 27
d. User friendliness of the applications M 16
e. Comprehensive help facility, guidelines for using the system L 5
10. Attitude towards Government M1 71
a. Customer perception towards Government: bureaucratic or customer-centric
H 45
b. Customer perception on the Government working: authoritative or participatory
M 27
Note:
For the top level parameters, the three ratings are H1 for high, M1 for medium and L1 for low
For the parameters, the three ratings are H for high, M for medium and L for low
The weights are indicative have been assigned based on our experience of conducting similar exercises in the past with various Governments and Government agencies
Maximum score is 1000
PricewaterhouseCoopers Page 179Confidential
D
Development of e-Government Strategy and Implementation Plan
Survey for CSI and GTI
Objective
The objective is to assess the awareness and reach of the e-Government projects amongst the customers and to determine satisfaction and impact amongst stakeholders and users of services offered by the e-Government programme.
Approach
It is suggested that a bi-modular approach be adopted for conducting the assessment exercise. The first module would involve qualitative in-depth interviews with key stakeholders and the second module would consist of quantitative survey with the beneficiaries.
Target Respondents
Module 1 – Qualitative stakeholder assessment
Since it is necessary to conduct an assessment from various perspectives, the target respondents would have to represent the stakeholders from both the service delivery as well as service access aspects. The target respondents for this module have been suggested keeping in mind the above.
Agency officials involved in the delivery of eGovernment initiatives.
Agency officials not directly related to eGovernment.
Common service centres / point of service delivery – These could be located at post offices, governorates etc. Interviews would be done with the person in charge of interaction with beneficiaries as well as overall supervision of the e-service delivery at the centres.
Key influencers / opinion leaders – These would constitute people who are in a position to have access to, are medium of information or influence the knowledge, attitudes and decisions at a community /population sub group level. These could be community leaders or other accepted motivators.
The qualitative module would help identify the parameters to be used for the quantitative module. Also it would give a good understanding of the existing practices.
Module 2 – Quantitative
In this module, face-to-face quantitative interviews would be conducted with the stakeholders and persons who are eligible as a beneficiary for a particular service. The questionnaire to be administered in the quantitative survey would be based on the findings from the qualitative module and data gathered from secondary sources like CIO surveys, similar studies by World Bank, etc. Once the first draft is ready, a round of pilot interviews would be done. With the inputs gathered from this phase and a revision of the questionnaire, the same would be administered to a larger sample. The scales to be used in the questionnaire would be 5 point Likert scale. Information like awareness/satisfaction might be captured as the top 2 / bottom 2 box score on the 5 point scale.
PricewaterhouseCoopers Page 180Confidential
D
Development of e-Government Strategy and Implementation Plan
PricewaterhouseCoopers Page 181Confidential
D
Development of e-Government Strategy and Implementation Plan
III. Marketing and Awareness
A national awareness, education and marketing campaign is essential to ensure that potential customers know about the e-Government services being rolled out, aspire to use them and are able to conveniently use them. Raising awareness through informational and educational support is an ongoing activity, but specially designed and timed campaigns will be needed, for example, to coincide with the launch of specific services or to target a particular customer group. Such campaigns must serve the overall goal of changing customer attitudes and, critically, their behaviour in favour of using e-Government services. A common central strategy is needed to guide the Government-wide branding and marketing initiative within which more focused and short-lived campaigns can be accommodated. In this regard it is extremely important to
- Institutionalize marketing and awareness as part of the formal organizational structure of the MoC&IT. The detailed structure and role is provided in Section 4 - Governance structure.
- Undertake Selection of a Marketing and PR agency to be involved throughout the program, so as to effectively communicate developments at every stage to stakeholders( Scope of work of a Marketing & PR Agency is provided in Annexure XII)
The summary and components of the overall marketing and awareness plan is presented in figure below and explained in detail subsequently.
Essential to ensure that customers know about the eGovernment services being rolled out, aspire to use them and are able to conveniently use them
Target Segments
• Businesses
• Citizens
• Residents
• Visitors
• Government Employee
Channels wrt Target Segments
• Billboard
• Newspaper
• Social Groups
• Internal Communication Newsletter
• Mosques
• TV
Messages
“It’s easy, cheap,
beneficial and smart to use eGovernment
services”
“You can save a lot of time
and convenience by renewing your driving license on-
line, just like Mahmood.”
Timing
• Pre-launch
• Launch
• Year 1, 2 and 3
Development /Approval Process
•Empanelment of an agency
• Creation of a cross agency marketing
Committee
• PR and marketing manager under the program office
Feedback / Review
• Data Collection
• Analysis
Figure 27: Marketing and Awareness Plan
PricewaterhouseCoopers Page 182Confidential
D
Development of e-Government Strategy and Implementation Plan
Design of the marketing and awareness campaign will include 6 key components, each of which should be defined and described in as much detail as possible during the planning and design stage:
Target market
Channel (media mix) selection
Message development based upon audience skills and education
Timing
Development/approval process
Feedback/review
In addition to the above, internal communication aimed at Government employees would also need to form part of the marketing and awareness strategy
Target Market
One marketing medium cannot reach all segments of the diverse community that makes up Ethiopia. Marketing campaigns do best when they define specific target markets and deliver a tailored marketing programme for each market. At a finer level of granularity, within the residential segment there are several specific segments of Ethiopian population that are traditionally harder to reach:
Elderly
Uneducated
Socially underprivileged
People with special needs
In the case of both specific residential and business segments, the country should consider using specially targeted media. For example, a greater use of personal communications channels, such as outreach through community organizations, working with opinion leaders, and developing word-of-mouth, may be more appropriate to reach the elderly and non-Ethiopian communities. In contrast, methods such as direct mail may be the best way to get messages across to segments of the business community.
Channel (Media) Selection
An appropriate communication and media channel mix is critical to ensure that everyone in the target audience receives and understands the campaign messages. Given customer diversity, any awareness-raising campaign that relies too heavily on just one medium or type of communication is unlikely to achieve its goals. However, there could be services that might be targeted at only a small segment of the society that would require targeted campaign through the channels and media of the choice of that segment. E.g. Pensions is one service that will only be targeted at elderly people, so the campaign will have to be directed through a medium that is most appealing to the old age segment. Scholarship service should be directed towards students and the target area should be educational institutions.
PricewaterhouseCoopers Page 183Confidential
D
Development of e-Government Strategy and Implementation Plan
Messages
The development of specific messages should be undertaken after the formal adoption of the e-Government strategy and implementation plan that specifies the order in which services will become available, the agencies affected, and other essential details. Assuming that the country adopts a ‘phased-in’ approach to implementing the e-Government services, the marketing plan will need to reflect the planned sequence of operations. The marketing team within the Project Management Office should work with advertising and public relations professionals to craft specific marketing messages, including both Amharic and non-Amharic speaking customers. The development of messages should proceed in tandem with refinement of the overall marketing plan. Creative concepts and material should be tested in focus groups for clarity, impact, ‘memorability’ and other dimensions.
Specifically, decisions regarding the level of budget available for the marketing campaign will drive the types of media that can be utilized, which will in turn drive the development of messages appropriate for each medium. Working with experts to craft messages requires a disciplined time commitment. Work should begin on the development of marketing messages at least 3 months prior to the desired launch of the marketing campaign. The Country must also factor in the additional upfront-time required to select the vendor(s).
Timing
It is crucial that an appropriate communication and media awareness programme is spread across the various stages of the e-Government program, to achieve its goals; the marketing campaigns must commence before the launch of the e-Government programme and must be sustained through the launch and lifetime of the program.
Development / Approval Process
An explicit communications development/approval process will ensure that communications are appropriate and consistent. To avoid confusion, it is particularly critical that the meaning of messages delivered in the internal communications programme be congruent with those that are used in the external marketing campaign. The marketing team (to be created as part of the MOCIT) will be responsible for reviewing draft materials, contributing editorial suggestions, approving the final version and ensuring that scheduled release dates are met. The Technical Committee should also review, comment and approve on critical internal and external communications.
Feedback, measurement of effectiveness and improvement
For the Country’s marketing and awareness programme, it is critical that feedback be sought and the effectiveness of communications measured on a regular basis. This will require scheduling and commitment to respond to constructive feedback and take action to address issues raised. These assessment efforts will provide valuable insight into whether the generic messages are reaching the intended audience and provide insights into ad hoc
PricewaterhouseCoopers Page 184Confidential
D
Development of e-Government Strategy and Implementation Plan
messages required in the near term. The feedback mechanism envisaged will address two requirements. The first is quantitative, tracking plan against execution and the delivery of messages to the intended stakeholder/audience. The second will focus on qualitative data; stakeholder/audience understanding and engagement of issues generated through communications. Collation of data will occur on an ongoing basis, and periodic, pre-planned reviews with the marketing team will be scheduled. It is important that the communication plan be adapted and subsequent behaviours demonstrate actions in response to feedback collected. This data collection responsibility can be part of the mandate of the Monitoring and Evaluation team of MOCIT.
Internal Communication
The Country’s internal communication about the e-Government programme represents the best chance to create a common frame of mind for the diverse group of employees who make up the government family. Communications to employees will be concentrated during the development/pre-launch phase, but will continue throughout the implementation of the e-Government programme.
An explicit marketing objective relates to employees:
Obtain 100% awareness and understanding of the e-Government services among Government employees
To achieve this objective, Ethiopia must utilize formal and informal communications. The management of the overall e-Government programme must collaborate with other agency officials to build consensus regarding the need for change and the expected benefits. The e-Government programme management must also communicate project activities to all stakeholders with an explanation regarding the organizational and personal benefits to be attained.
There will be 4 primary components of the internal communication programme:
Internal stakeholder/audience identification
Channel selection
Message development
Feedback, measurement of effectiveness and improvement
Marketing and Awareness Brief
Each of the above elements has been summarized through the marketing and communication brief presented below, which can also be used as a brief for the appointment of the advertising and marketing agency. A detailed marketing and awareness strategy document is also provided as Annexure IV to the report.
Table 30: Marketing and Awareness Brief
Project e-Government Strategy for Ethiopia
Agency To Be Decided
Background
PricewaterhouseCoopers Page 185Confidential
D
Development of e-Government Strategy and Implementation Plan
Governments around the world are leveraging advances in Information and Communication Technologies (ICT) to enhance their service delivery mechanism to improve citizen satisfaction and gain competitive advantage over other nations to attract investments
As a part of this programme, major projects such as the Woreda Network and National Data Centre have been launched and should be marketed
The impetus of the Country on leveraging ICT has resulted in a high degree of intra-ministerial computerization and a good ICT infrastructure
The initiative on the ICT Community Centres to educate and create ICT awareness across the Country should be highlighted
The Country has also set-up a High Committee and Technical Committee to provide direction and decision to developing and implementing a comprehensive e-Government strategy
The e-Government strategy proposes providing customer value through aligning Government across the lifecycle events of the citizens, residents and businesses
The strategy proposes to deliver most of the Government services in an integrated manner through multiple channels
Benefits offered under the e-Government programme for which the marketing and awareness strategy needs to cater:
Convenience
Efficiency
Reach
Value for money
Value proposition
“It’s easy, economical, beneficial and smart to use e-Government services”
“You can save a lot of time and convenience by renewing your driving license on-line, or apply Passport online or File Taxes”
Marketing and Awareness objective
The business objectives should aim for the following:
Create awareness
Build credibility for the e-Government strategy
Drive higher participation across the various target segments
Highlight the impact of the e-Government strategy
The communication objective is as follows:
Pull rather than push communications strategy
We have to establish that e-Government strategy can actually make a difference to the customers in Ethiopia
Drive confidence amongst businesses - Ethiopia is a good place to invest
E-Government is about participatory Government
PricewaterhouseCoopers Page 186Confidential
D
Development of e-Government Strategy and Implementation Plan
Target Audience: Who are we talking to? What do these people currently think of our programme? What is the desired perception?
At a finer level of granularity, within the residential segment, there are several specific segments of the Country’s population that are traditionally harder to reach:
Elderly
Uneducated
Socially underprivileged
People with special needs
Within the business community, there may be particular groups that will require special targeting. For example, if the Country launches a web application that enables applications for company registrations process to be done online, it may be necessary to market this service to the relevant users. In the case of both specific residential and business segments, the Country should consider using specially targeted media. For example, a greater use of personal communications channels, such as outreach through community organizations, working with opinion leaders, and developing word-of-mouth, may be more appropriate to reach the elderly communities. In contrast, methods such as direct mail may be the best way to get messages across to segments of the business community.
Current Thinking:
Diverse views about what is eGovernment and the benefits
Overall OK with the objective of the programme
Certain pessimism/scepticism within the customer segment in the use of electronic service
What we are trying to achieve is far too down-the-line
Desired Thinking:
The programme is useful
Participation is important
The programme would not wait for anyone
There are many who would benefit
Success of the programme is not in its design but in the collective participation in its implementation
What is the hot button that we can leverage to influence our target audience?
The programme is already underway and people are benefiting
It is only a start, but the best is yet to come
People who participate now will benefit later
What is the key thought that marketing and advertising has to communicate?
Participating is key to success
PricewaterhouseCoopers Page 187Confidential
D
Development of e-Government Strategy and Implementation Plan
e-Government is about services and about customers
eGovernment is a key strategic priority
Act now or repent later – as an industry and as a nation
Call to action?
Strong call-to-action on the desired strategy
Large no. of responses
Possible communication vehicles
One marketing medium cannot reach all segments of the diverse community that makes up the Country. Marketing campaigns do best when they define specific target markets and deliver a tailored marketing programme for each market. Prior experience with eGovernment awareness campaigns indicates that billboards and traditional media – such as radio and newspaper would be most cost effective, but alone will not be sufficient to penetrate the target market with news of the e-Government services. We also recommend presentations at schools, community organizations and events to supplement billboards and traditional advertising. Additionally we could also look at Public places for distribution of flyers and leaflets. These marketing outlets will provide an opportunity for the Country to tailor specific messages to individual communities.
Execution considerations
Value for advertisement spend
Summary of the Marketing and Awareness Plan
The objective of the marketing and awareness strategy would be met through the following:
Initial burst of advertisement in dailies with the launch of programme stressing upon the delivery channels
Sustained public relation efforts aimed at covering the benefits and recipients
Branding of eGovernment strategy for the Country
Documenting the benefits and outcomes of selected agency projects through the preparation of advocacy videos that can be circulated among the various interest groups
Circulation of bi-monthly progress reports among all internal stakeholders
Preparation and publication of a quarterly event planner for wider circulation through national dailies. This can also be used to call for applications under various strategies
Message
The development of specific messages should be undertaken after the formal adoption of the e-Government strategy and implementation plan that specifies the order in which services will become available, the agencies affected, and other essential details. Assuming
PricewaterhouseCoopers Page 188Confidential
D
Development of e-Government Strategy and Implementation Plan
that the Country adopts a “phased-in” approach to implementing the e-Government services, the marketing plan will need to reflect the planned sequence of operations.
The marketing team within the project office should work with advertising and public relations professionals to craft specific marketing messages, including both Amharic and non- Amharic speaking customers. The development of messages should proceed in tandem with refinement of the overall marketing plan. Creative concepts and material should be tested in focus groups for clarity, impact, “memorability” and other dimensions.
Specifically, decisions regarding the level of budget available for the marketing campaign will drive the types of media that can be utilized, which will in turn drive the development of messages appropriate for each medium.
Working with experts to craft messages requires a disciplined time commitment. Work should begin on the development of marketing messages at least three months prior to the desired launch of the marketing campaign. The Country must also factor in the additional upfront time required to select the vendor(s). Table 23 summarises the message development component.
Table 31: Message Development
Challenges • The timeline for key implementation milestones may change so mapping key messages to it is a challenge
• Working with authors to craft messages; requires disciplined time commitment• Tracking and monitoring of messages distributed and to whom
• The timeline for key implementation milestones may change so mapping key messages to it is a challenge
• Working with authors to craft messages; requires disciplined time commitment• Tracking and monitoring of messages distributed and to whom
Challenges • The timeline for key implementation milestones may change so mapping key messages to it is a challenge
• Working with authors to craft messages; requires disciplined time commitment• Tracking and monitoring of messages distributed and to whom
• The timeline for key implementation milestones may change so mapping key messages to it is a challenge
• Working with authors to craft messages; requires disciplined time commitment• Tracking and monitoring of messages distributed and to whom
Actions • Proactive planning of generic messages and build ‘database’ of items ready for publication
• Clearly assign “owners” for content development of messages• Conduct detailed planning on a rolling 3-4 month basis to reflect shifting
events timeline
• Proactive planning of generic messages and build ‘database’ of items ready for publication
• Clearly assign “owners” for content development of messages• Conduct detailed planning on a rolling 3-4 month basis to reflect shifting
events timeline
Actions • Proactive planning of generic messages and build ‘database’ of items ready for publication
• Clearly assign “owners” for content development of messages• Conduct detailed planning on a rolling 3-4 month basis to reflect shifting
events timeline
• Proactive planning of generic messages and build ‘database’ of items ready for publication
• Clearly assign “owners” for content development of messages• Conduct detailed planning on a rolling 3-4 month basis to reflect shifting
events timeline
Message DevelopmentMessage Development
• Work with the implementation team to track key milestones and likely timing• Identify generic messages in advance, plan and prepare drafts for publication• Work continuously with the implementation team to anticipate
communication/message requirements• Manage detailed communications plan and work with experts to determine
content and format
• Work with the implementation team to track key milestones and likely timing• Identify generic messages in advance, plan and prepare drafts for publication• Work continuously with the implementation team to anticipate
communication/message requirements• Manage detailed communications plan and work with experts to determine
content and format
Message DevelopmentMessage Development
• Work with the implementation team to track key milestones and likely timing• Identify generic messages in advance, plan and prepare drafts for publication• Work continuously with the implementation team to anticipate
communication/message requirements• Manage detailed communications plan and work with experts to determine
content and format
• Work with the implementation team to track key milestones and likely timing• Identify generic messages in advance, plan and prepare drafts for publication• Work continuously with the implementation team to anticipate
communication/message requirements• Manage detailed communications plan and work with experts to determine
content and format
There are a number of generic messages that can be pre-planned, prepared and pre-approved. These will serve to raise customer’s awareness, and to answer the basic questions that they are likely to have about the e-Government Strategy. Suggested subjects for these generic messages are listed below.
Communication of the rationale
What is the vision for e-Government programme
Why do we need an e-Government strategy
PricewaterhouseCoopers Page 189Confidential
D
Development of e-Government Strategy and Implementation Plan
What are the major benefits?
Establish Awareness of the Project
What is the e-Government programme about
Sponsorship – who is the champion?
Structure & organization
Implementation approach
Implementation timeline
Integration with other Country initiatives
What will change?
What will stay the same?
What has happened so far?
Periodic update on progress
Achievement of milestones and celebrations of success
Changes in timeline, scope and/or approach
Differentiation of this project from others
Why will this one succeed?
Lessons incorporated from other projects
Impact on the Government’s functioning
How will we operate differently?
How will this be perceived by the “outside” world?
Impact on the Individual Customer
What will change for me?
Generic, pre approved messages will only partially meet the information requirements of the Country’s employees. Ad hoc messages may also be needed as the dynamics and events change through the implementation lifecycle. Ad hoc messages will be needed to address key developments, issues arising and achievements across all facets of the e-Government programme. To capture these, the project office and the e-Government implementation teams in various agencies will need to remain in close contact.
General Awareness
Making a noticeable difference in the Country’s quality of customer service and increasing public access to Government information and services are intrinsic drivers of the e-Government Strategy. The judicious use of the modern customer service technology that will be deployed in the common channels being created will help to enhance the Country’s image in the public eye. While there may be a strong tendency to begin publicity early, the best approach will be to delay the campaign until sufficient infrastructure is in place to
PricewaterhouseCoopers Page 190Confidential
D
Development of e-Government Strategy and Implementation Plan
handle a sudden influx of telephone calls, emails, and service requests. In this manner, the Country will avoid the problem of building expectations that are then unrealized.
Table 32: General Awareness Campaign Overview
Implementation Stage Audience Primary Themes
Pre-launch (Build-up) Government Employees Existing services and eGovernment strategy & plan
Launch All Target Segments (Citizens and Residents, Businesses, Visitors, Employees)
Services and channels being launched
First year of full implementation
All Target Segments (Citizens and Residents, Businesses, Visitors, Employees)
Achievements
Additional services and channel enhancements made available
Second year of full implementation
All Target Segments (Citizens and Residents, Businesses, Visitors, Employees)
Achievements so far
Additional services and channel enhancements made available
Showcasing e-Government programme internationally
Third year of full implementation
All target segments (Citizens and Residents, Businesses, Visitors, Employees)
Achievements so far
Additional services made available
Showcasing e-Government programme internationally
Government employees will continue to be responsible for delivering services to residents and businesses. Employees interface with the public on a daily basis and their understanding of the e-Government services is a critical success factor. Moreover, if employees are appropriately informed, they can serve as ambassadors, helping to spread the word about the new services. The general rule of “tell them early, tell them often” should be observed with truthful, straightforward, consistent communications to all Government employees.
PricewaterhouseCoopers Page 191Confidential
D
Development of e-Government Strategy and Implementation Plan
It is critical that Country’s management is fully educated about and supportive of, the e-Government programme. Government employees will take their cue from leadership.
Management’s approach and attitude about the new system will filter to Agency personnel where the new system actually interfaces with the public. If the management does not show its commitment to the e-Government programme, employees will be reluctant to support the new system, eventually resulting in a lower level of customer service and satisfaction with the system.
Development / Approval Process
An explicit communications development/approval process will ensure that communications are appropriate and consistent. To avoid confusion, it is particularly critical that the meaning of messages delivered in the internal communications programme be congruent with those that are used in the external marketing campaign. The marketing team will be responsible for reviewing draft materials; contributing editorial suggestions, approving the final version and ensuring that scheduled release dates are met. MOCIT should also review and comment on critical internal communications. Table 25 below summarizes the development/approval process.
Table 33: Development / Approval Process
Challenges • Smart selection of message contributors• Keeping to development and delivery schedule• Managing a fast path through the process in the case of extraordinary ad hoc
communications
• Smart selection of message contributors• Keeping to development and delivery schedule• Managing a fast path through the process in the case of extraordinary ad hoc
communications
Challenges • Smart selection of message contributors• Keeping to development and delivery schedule• Managing a fast path through the process in the case of extraordinary ad hoc
communications
• Smart selection of message contributors• Keeping to development and delivery schedule• Managing a fast path through the process in the case of extraordinary ad hoc
communications
Actions • Develop proposed process and seek agreement• Communicate and educate Champion and implementation team• Marketing Team within the Programme Office will instigate and manage the
process
• Develop proposed process and seek agreement• Communicate and educate Champion and implementation team• Marketing Team within the Programme Office will instigate and manage the
process
Actions • Develop proposed process and seek agreement• Communicate and educate Champion and implementation team• Marketing Team within the Programme Office will instigate and manage the
process
• Develop proposed process and seek agreement• Communicate and educate Champion and implementation team• Marketing Team within the Programme Office will instigate and manage the
process
Development / Approval Process
Development / Approval Process
• Creation of a robust yet efficient process for reviewing communications• Managing the development/editorial process to ensure appropriate content• Monitoring consistency of messages• Facilitating timely release of messages• Ensuring appropriate channel selection and delivery
• Creation of a robust yet efficient process for reviewing communications• Managing the development/editorial process to ensure appropriate content• Monitoring consistency of messages• Facilitating timely release of messages• Ensuring appropriate channel selection and delivery
Development / Approval Process
Development / Approval Process
• Creation of a robust yet efficient process for reviewing communications• Managing the development/editorial process to ensure appropriate content• Monitoring consistency of messages• Facilitating timely release of messages• Ensuring appropriate channel selection and delivery
• Creation of a robust yet efficient process for reviewing communications• Managing the development/editorial process to ensure appropriate content• Monitoring consistency of messages• Facilitating timely release of messages• Ensuring appropriate channel selection and delivery
Feedback, measurement of effectiveness and improvement
For the Country’s internal communications programme, it is critical that feedback be sought and the effectiveness of communications measured on a regular basis.
PricewaterhouseCoopers Page 192Confidential
D
Development of e-Government Strategy and Implementation Plan
This will require scheduling and commitment to respond to constructive feedback and take action to address issues raised. These assessment efforts will provide valuable insight into whether the generic messages are reaching the intended audience and provide insights into ad hoc messages required in the near term.
The feedback mechanism envisaged will address two requirements. The first is quantitative, tracking plan against execution and the delivery of messages to the intended stakeholder/audience. The second will focus on qualitative data; stakeholder/audience understanding and engagement or issues generated through communications.
Collation of data will occur on an ongoing basis, and periodic, pre-planned reviews with the marketing team will be scheduled. It is important that the communication plan be adapted and subsequent behaviours demonstrate actions in response to feedback collected.
PricewaterhouseCoopers Page 193Confidential
D
Development of e-Government Strategy and Implementation Plan
Table 34: Feedback, measurement of effectiveness and improvement
Challenges • Leveraging the Kingdom’s communications network to gather and channel feedback centrally
• Reacting appropriately and speedily to feedback• Showing that the eGovernment team listens and hears
• Leveraging the Kingdom’s communications network to gather and channel feedback centrally
• Reacting appropriately and speedily to feedback• Showing that the eGovernment team listens and hears
Challenges • Leveraging the Kingdom’s communications network to gather and channel feedback centrally
• Reacting appropriately and speedily to feedback• Showing that the eGovernment team listens and hears
• Leveraging the Kingdom’s communications network to gather and channel feedback centrally
• Reacting appropriately and speedily to feedback• Showing that the eGovernment team listens and hears
Actions • Develop standard approaches for obtaining qualitative data through focus groups and on site feedback
• Develop standard approaches for assessing quantitative data from plan execution, distribution, questionnaires, etc.
• Schedule periodic reviews with the eGovernment team
• Develop standard approaches for obtaining qualitative data through focus groups and on site feedback
• Develop standard approaches for assessing quantitative data from plan execution, distribution, questionnaires, etc.
• Schedule periodic reviews with the eGovernment team
Actions • Develop standard approaches for obtaining qualitative data through focus groups and on site feedback
• Develop standard approaches for assessing quantitative data from plan execution, distribution, questionnaires, etc.
• Schedule periodic reviews with the eGovernment team
• Develop standard approaches for obtaining qualitative data through focus groups and on site feedback
• Develop standard approaches for assessing quantitative data from plan execution, distribution, questionnaires, etc.
• Schedule periodic reviews with the eGovernment team
Feedback andMeasurement ofEffectiveness
Feedback andMeasurement ofEffectiveness
• Develop and facilitate feedback mechanisms • Capture, document and channel feedback and issues raised as appropriate for
resolution, action planning, further communication• Develop methods of measuring effectiveness of communication activity, both
quantitative and qualitative• Conduct scheduled reassessments of communication activity and build
amendments to plan
• Develop and facilitate feedback mechanisms • Capture, document and channel feedback and issues raised as appropriate for
resolution, action planning, further communication• Develop methods of measuring effectiveness of communication activity, both
quantitative and qualitative• Conduct scheduled reassessments of communication activity and build
amendments to plan
Feedback andMeasurement ofEffectiveness
Feedback andMeasurement ofEffectiveness
• Develop and facilitate feedback mechanisms • Capture, document and channel feedback and issues raised as appropriate for
resolution, action planning, further communication• Develop methods of measuring effectiveness of communication activity, both
quantitative and qualitative• Conduct scheduled reassessments of communication activity and build
amendments to plan
• Develop and facilitate feedback mechanisms • Capture, document and channel feedback and issues raised as appropriate for
resolution, action planning, further communication• Develop methods of measuring effectiveness of communication activity, both
quantitative and qualitative• Conduct scheduled reassessments of communication activity and build
amendments to plan
Figure below illustrates the continuous cycle of data collection, followed by review and analysis, adjustment to the communications plan, incorporating feedback from stakeholders, and refined execution of the communications plan.
Data CollectionReporting /
Management Review
Adjustment to Communication
Plan
Feedback from stakeholders
Execute Communication
Plan
Continuous Improvement
Figure 28: Continuous Improvement in Communications
Audience skills and education
Raising awareness about an issue or topic does not necessarily lead to lasting changes in attitudes and behaviour, especially when people also need specific skills they may not already posses. For awareness campaign to achieve long-term benefits it is also necessary to consider how to provide a specific customer group with the skills and incentives to
PricewaterhouseCoopers Page 194Confidential
D
Development of e-Government Strategy and Implementation Plan
change. Thus, changing behaviour may also mean, for some potential customers, the need to upgrade skills, so that the awareness campaign should be linked to educational and training opportunities whoever provides these (e.g. the public sector, the private sector and possibly also NGOs) and however provided (e.g. traditionally, through intermediary help, or through eLearning courses). Existing educational offers must therefore be mapped to see whether adequate training and support is available and if not, new offers may need to be provided or encouraged in order to fulfil the needs of the campaign. An excellent campaign could fail if it convinces customers of the desirability of using Government services but leaves them without the necessary skills.
Advertising Revenue
There is also an opportunity for the Country to earn revenues by charging other organizations to advertise on the e-Government portal and the common services centres and other channels being set-up. This revenue could then be used to defray the advertising costs to build awareness for the e-Government Services.
PricewaterhouseCoopers Page 195Confidential
D
Development of e-Government Strategy and Implementation Plan
IV. Standards and policies
Introduction
During the implementation of the e-Government strategy, a number of the proposed eGovernment initiatives will involve development of new systems for provisioning online services.
These new systems, deployed at either a central or a local agency level, are developed with specifications and solutions that match the goals and tasks relevant to a particular department. However, taking the big picture into account, it is important for any such initiative to give adequate attention to surrounding Government institutions and their allied ICT initiatives so as to enhance the compatibility, interoperability and efficiency while also eliminating redundancy.
It is important for all Government agencies to make a concerted effort to implement eGovernment initiatives in a collaborative manner which, in addition to meeting the specific needs of the owner agencies, are also in line with the overall Management practices
ICT usage
Technical and security issues
Web services provisioning
Data and information exchange
Scalability and Interoperability
Summary of the Current Scenario
Based on Stakeholder Assessment the various standards and policies that are already implemented or under progress include
Table 35: Regulations, Policies, Guidelines and Standards
Regulations/Laws
S.No
Name Status
1.
National Electronic Transaction Law Draft document has been prepared
2.
National Data Protection Law completed(draft) document has been prepared
3.
e-Commerce Law. completed(draft) document has been prepared
4.
e-Signature Law. Ongoing
5 Computer Misuse and Cyber Crime Law. completed(draft) document
PricewaterhouseCoopers Page 196Confidential
D
Development of e-Government Strategy and Implementation Plan
. has been prepared
Policies/Framework
S.No
Name Status
1. National Public Key Infrastructure (PKI) Framework.
Ongoing
2. National Enterprise Architecture Framework for Ethiopia
Ongoing
3. Government Information Systems Interoperability Framework /Standard (e-GIF).
On ratification process
Standards
S.No
Name Status
1. Keyboard Layout, Typeface and OCR standard Completed, ratified and implemented
2. Critical Localization Standard for Ethiopic languages such as Amharic, Oromifa, Tigrigna, Afaraf and Somali.
Completed, ratified and implemented
3. ICT Accessibility Requirement Standard for People with Disability Information Exchange Standard.
Completed and on the approval process
4. ICT Transliteration Standard Completed and on the approval process
5. Ethiopic Soundex (Phonetic Matching) Standard.
Completed and on the approval process
6. ICT Content Digitization Standard. On the Approval Process
7. Information exchange standard completed and waiting for
PricewaterhouseCoopers Page 197Confidential
D
Development of e-Government Strategy and Implementation Plan
approval
8. E-Commerce Standard. on going
9. Ethiopic Collation standard. On the Approval Process
10. Contractual Standard Conditions for ICT Services/Projects.
Completed
11. Business Process Re-engineering Completed
Guidelines
S. No Name Status
1. Standard Evaluation and Selection guideline for ICT Hardware and Software.
Completed,
2. Certification Guideline for ICT Professionals, Consultants and Trainers.
Completed
3. ICT Project management Guideline. Completed
Recommendation:
There are various standards and policies which need to be laid down for the e-Government strategy. Following are the suggested measures for implementing Standards and guidelines required for effective implementation of the strategy -
1. Implementation of Standards through a Technical Committee specifically created, comprising Government, Academic, Industry and Outside experts( Section 4- Governance Structure)
2. Engage an external agency for design and implementation of the Standards/Policies
3. Implementation of the existing Enterprise Architecture Framework, E-Government Interoperability Framework and Public Key Infrastructure
4. Adoption of Cyber laws for effective implementation of e-Services
PricewaterhouseCoopers Page 198Confidential
D
Development of e-Government Strategy and Implementation Plan
The policies/standards/guidelines that help to support the implementation of various e-Government initiatives are provided in the figure below:
Figure 29: Policy/Standards/Guidelines Framework
PricewaterhouseCoopers Page 199Confidential
D
Development of e-Government Strategy and Implementation Plan
The policies/standards/guidelines that MOCIT needs to develop for further implementing e-Government is provided in the following tables. The year-wise implementation of the Standards and Policies has been designed keeping the following considerations:
Current e-readiness of the Ministries/Agencies in Ethiopia Alignment with the Overall e-Government Strategy Dimensions and Components Initiatives already undertaken in terms of laws, policies and standards Phasing is also based on priority of the Standards/Policies/Guidelines, so as to facilitate
effective e-Government implementation. It has been envisaged that the Policies/Standards/Guidelines framework should be
completed within the next 3 Years for timely implementation of e-Government in the Country.
Figure 30: Implementation Plan for Standards and Policies
PricewaterhouseCoopers Page 200Confidential
D
Development of e-Government Strategy and Implementation Plan
V. Public Private Partnerships (PPP)
Introduction
A Public Private Partnership, or PPP, involves government and private sectors working together to deliver infrastructure or services that are traditionally provided by government. It involves private financing, construction and management of key infrastructure with the primary objective of improving public services. PPPs focus on service outcome, not assets.
PPP mode of project implementation is a necessity for the following reasons:-
To enhance public services management and expedite the implementation
To accelerate infrastructure provision and bridge the huge infrastructure gap
To provide opportunity to local private sector to gain experience and work with the
government
To address national inequalities
To overcome barriers of social, economic and geographical isolation
To increase access to information and education
To enhance the government capacity to manage the relationship with the private
partner as well as manage the changes associated with the shift from traditional to
digital paradigm.
PPP in Ethiopia
PPP forums have been established by the Ethiopia Chamber of Commerce and the
previously combined Ministry of Trade and Industry for addressing PPP related issues. For
the dialogue platforms, the forum promotes and strengthens the existing public-private
platforms (PPP) in the regions and at federal level. Presently, the Ministry of Trade and
Industry organizes regular forums with the Chamber of Commerce both at national and
regional levels. Following are the two forums that have been established to foster public
and private partnerships:-
PricewaterhouseCoopers Page 201Confidential
Basic principles for PPP
PPPs are concerned with services, not assets
o The government does not need to own infrastructure to deliver services
PPPs are a procurement option, not a novel method of developing public infrastructure
o PPP policy sits alongside other procurement methods – i.e. conventional, outsourcing, leasing etc.
o Suitable to some public projects, not all projects
PPPs are not ‘new money’
o Service outputs must be paid for, whether directly (e.g. user charges) or by appropriation
o Must therefore be affordable – either to users (user charges) or to the budget
D
Development of e-Government Strategy and Implementation Plan
Public and Business Community Joint Consultation Forum
Objective: To create awareness concerning government development vision; to provide
support for business communities; to discuss and comment on draft business and
investment laws and regulations; to discus on implementation problems of laws and
regulations and to create smooth relationship between government and business
community.
Current activities: Creating common understanding concerning government development
policies/vision: giving ideas and opinion before the issuance of business laws; creating an
enabling environment for business communities; provide suggestions/comments by
identifying implementation problems and finding solutions for the same.,
Addis Ababa Investment and Industry Development Consultation forum
Objective: To create enabling environment for investment and industrial development
based on transparent and free market economic policy; to ensure fast and sustainable
industrial development by creating common understanding and coordination between
government and the business communities/partners; to promote development endeavor of
those actors which have key roles in urban development;: to improve quality and price of
industrial products by integrating all development partners.
Current activities: Finding ways and means to promote the investment and industrial
development of Addis Ababa City Government; improving industrial development by
providing necessary support; conducting studies to solve development problems; working
together with investors to introduce large investment opportunities; and providing training
to improve efficiency of human resources.
Besides the above two forum established by the government, some of the successful PPP
initiatives in Ethiopia in the ICT sector are discussed below:
ICT Community Centres
92 ICT Community centers are currently operating across Ethiopia. These centers are
mainly driven by the local communities with support from the ICTAD. A laudable feature of
this initiative is the self sustainable nature of the ICT community centers – while the initial
funding has been provided by ICTAD for one year, these centers need to manage their
operations after the first year on their own. Most of these centers are generating enough
revenues to meet their operating costs by providing services such as training facilities,
internet access facilities, photocopying and printing etc. A comprehensive Monitoring and
Evaluation Framework and a repository of learning’s of the various centers needs to be
created to ensure that this initiative can be expanded and improved. The use of these
centers for the delivery of e-Services will further strengthen the business case of these
centers by providing an additional revenue stream.
Unified Billing System (UBS)
PricewaterhouseCoopers Page 202Confidential
D
Development of e-Government Strategy and Implementation Plan
The Unified Billing System (UBS) is one of the flagship projects in ICT sector that is being
implemented on the Build Own Operate Transfer (BOOT) model. The Private partner shall
Build Own and Operate Utility Bill collection centers and will eventually transfer the entire
system to the Government at the end of the PPP contract. 40+ UBS centers are planned to
be established as part of the project, to act as one stop shops for payment of bills for
power, water and telecom. It is recommended that these centers may be upgraded to offer
all the e-Services as Common Services Centers after the pilot has been successfully
accomplished.
PricewaterhouseCoopers Page 203Confidential
D
Development of e-Government Strategy and Implementation Plan
ICT business incubator in Ethiopia
Incubation Centers have been setup by the ICTAD to encourage and support entrepreneurs
of Ethiopia in ICT related ventures. Currently there are 4 Incubation centers which are
supporting 47 startup companies. Following are the main objectives of the incubation
centers:-
Provide shared Workspace and Facilities
• Facilities typically include conference rooms, phone system and broadband
connectivity, security, etc.
Provide Business Advisory Services
• Basic assistance provided by incubator staff (business plan)
• Mentoring/coaching by staff and outside entrepreneurs
• Access to external network of service providers (e.g.,accountants, lawyers),
plus universities, tech parks, private enterprises, etc.
Ensure Access to Capital
• in-house seed equity or small loan fund on a case to case basis
• Affiliated angel investors and venture capital funds
• Relationships with banks
The main focus of the Incubation centers is to create strong companies that can sustain
themselves after a period of initial assistance. Government provides policy and financial
support, but does not run the incubator directly. ICTAD Project contributes significant
resources to develop the incubator.
PPP opportunities for implementation of the e-Government program and
recommendations for their realization
Table 36: PPP opportunities and Recommendations
S.No. Area Recommendations
1. Program and project implementation
1. Ethiopian Telecommunication Company could partner the e-Government program in roll out of various channels for services delivery. E-Government implementation across the country will help the company in increasing its revenues through increased usage of its ICT infrastructure. ETC could in turn contribute by lowering bandwidth and mobile tariffs / making SMS and calls to some of the pre-designated service delivery numbers free etc..
2. Banks such as the Bank of Ethiopia could develop the payment gateway and charge a nominal fee from the government for the use of payment gateway. This will benefit the bank as number of transactions through its payment gateway would increase. Furthermore, use of debit cards and
PricewaterhouseCoopers Page 204Confidential
D
Development of e-Government Strategy and Implementation Plan
S.No. Area Recommendations
credit cards issued by the bank is likely to increase once payments for government services are facilitate electronically. Another way the banking sector could contribute is by the way of facilitating payment of fees for government services using their ATM machines and branch outlets for free / nominal fees.
3. Feasibility of all projects for private partnership must be examined during the design stage and in case the same is established then that PPP should be preferred mode of implementation. This should be done in a manner to ensure that the private sector brings in the initial investment and runs the project and recoups its investment through levy of user charges / transaction fees. This will ensure that the risk of the project is shared with the private sector, efficiencies of the private sector are leveraged and the model is sustainable. The provision of viability gap funding, where-ever possible (to provide subsidies / one time funds for making PPP feasible) should also be explored where-ever required.
4. The government could develop course curriculum aimed at increasing computer literacy and to train people in using e-Services while the private educational institutes could take the onus of imparting the courses at a reasonable cost.
2. Generation of funds and resources for the implementation of the e-Government program
1. The government could allow the private sector to utilize its service delivery channels such as the portal and the Citizen Service Centers for advertising their products and services. This could become a steady revenue stream for the e-Government program while the companies could gain trust and goodwill due to their association with a program of national significance.
2. The industry in general could provide funds as well as used computers as part of their Corporate Social Responsibility (CSR) initiatives so that the same may be used at CSCs and training centers.
3. Encouragement to entrepreneurs for setting up companies in the ICT sector
1. The number of ICT community centers needs to be increased from the present 65 for a better coverage of the population. Furthermore, once these centers are allowed to offer Services as Common Service
PricewaterhouseCoopers Page 205Confidential
D
Development of e-Government Strategy and Implementation Plan
S.No. Area Recommendations
Centers their revenue stream would also grow. Entrepreneurs, individuals and companies should be made aware and encouraged to take up the establishment of new ICT community centers.
2. The infrastructure and funds available at the 4 ICT incubation centers that are currently operational needs to be enhanced so that they can offer better services to the entrepreneurs. This number also needs to be increased to at least 10 incubation centers spread across the country for better results.
Strategies to promote ICT development through Public Private Partnerships
Following are a brief of illustrative strategic initiatives to enable the expansion and growth
of the ICT sector and the Private sector companies as a whole using PPP as a tool.
Revise Policies to attract Investments:
Foreign Investments into ICT Sector: Foreign investment is required to supplement
local investment in the local ICT Sector, in order to stimulate the desired growth
within the sector. It is therefore necessary to explore creation of a consortium-
driven agency or policies dedicated to attracting foreign investment in ICT.
Develop and/or revise tax and other incentives for individuals and firms to
encourage investment in ICT. There are incentive schemes in existence and these
need to be reviewed in terms of directing and effectively supporting the ICT Sector.
Promote Private sector Collaborations:
A key aspect of developing a stable and growing trade environment in ICT Sector is
the establishment of linkages between the larger companies and the SMMEs.
Ownership/investment/mentoring linkages between large companies and new
entrant SMMEs.
Outsourcing arrangements of non-core functions of larger companies to other
companies in the sector.
Supply/Distribution arrangements between large companies and SMMEs.
Partnerships and alliances, especially between local companies and Multi National
Enterprises.
eKiosks installation on PPP model
The Kiosks are another ICT initiatives which help in reengineering several Public and
Private sector processes and making the citizen self sufficient in accessing information and
performing certain key day to day operations.Kiosks need to be set up across the country to
PricewaterhouseCoopers Page 206Confidential
D
Development of e-Government Strategy and Implementation Plan
enable information dissemination at the grass root level. Private sector partnerships need
to be encouraged to expedite the rollout of kiosks.
Country wide rollout of ICT Community Centers on PPP model
The lack of ICT usage and PC penetration keeps a large section of the population out of ICT
reach. In order to integrate this section into the mainstream of ICT beneficiaries there is a
pressing need for ICT facilitators who will assist the ICT illiterate citizens in not only
availing the Government services but also will guide them through relevant information.
Additional ICT centers need to be implemented on mechanisms such as the Public Private
Partnerships engaging the private sector. Currently there are 65 community driven ICT
Centers with different levels of ICT infrastructure and services. There needs to be
Government Driven ICT centers with uniformity in infrastructure access and citizen
services.
ICT Trade Fair/ Forums:
In order to create an ecosystem for Public and Private collaborations, the Government
must establish and encourage networking events that permit face-to-face discussion
and sharing of information and knowledge. These networking events can take the form
of ICT Sector focused exhibitions, conferences and workshops.
Table 37: ICT Events
Sr# Events Frequency Stakeholders
1 Workshops Every
Month
ICT Workshop for students in Universities to
build skills in ICT
ICT workshop Ministries, Agencies for e-
Governance
ICT workshop for Private sector to enable
better business operations using ICT
2 Exhibitions Half Yearly Trade fair to show case the ICT technologies to
build a stronger domestic demand
Exhibition to attract Foreign investments in
Ethiopian ICT to promote IT and IT enabled
industry in Ethiopia.
3 Conference One Every
Month
Private Sector conference to pursue public
private partnerships
ICT Trade conference to address business
related issues and concerns
International ICT Conference to build stronger
PricewaterhouseCoopers Page 207Confidential
D
Development of e-Government Strategy and Implementation Plan
ICT trade relations with other countries and
address issues related to International ICT
Trade
Establish a stakeholder group or groups to
foster collaborative projects and networking
events, e.g. projects such as building a
broadband community network.
Establish SME Centers
SME Centers need to be established for supporting and nurturing the Ethiopian SMEs.
SME Centers would act as "one-stop-shops" located in various parts of the country that
provide information, advisory and consulting services in the following areas:
productivity, improvement, technology upgrading, market information, product and
market development, trade promotion, credit, financing and entrepreneurship
Development of SME databases providing easy access to buyers and suppliers.
Imports, customs and tariff rates, etc.
All the ICT Agencies across the regions must set up SME Support Centers in their offices to
promote SME development. There must be clear mandate to the ICT Agencies to
incorporate and Implement SME focused initiatives in their Annual Plans. A central ICT
SME Cell must be established in the MINISTRY OF COMMUNICATIONS & IT to coordinate
with all the regional SME Centers in working towards a common goal to support SMEs.
Promote trade through E-Commerce
The growth of the local ICT Sector cannot be promoted through addressing the local
market alone. E-commerce is a solution to tap potential markets across the world in a very
cost effective manner.
Ethiopia with its diverse cultural backgrounds of its people and varieties of natural
resources has a rich heritage of crafts skills. Handicraft, Leather and textiles are one of the
important and widely spread occupations of most Ethiopians next to agriculture. Thus it
would be important to design appropriate mechanisms that will help SMEs participate in
product modernization and export market development especially in leather and leather
products, textiles, horticulture, etc., in which the country has comparative advantages.
ICT Information Centers (IICs): Facilitating access to information and skills
Ethiopia suffers from in information asymmetry. Relevant information is difficult to obtain
and it is often outdated, very expensive or only available from isolated institutions. The
main objective of the ICT Information Centres (IICs) programme would be to use ICT and
relevant business information for the development of local skills and public usage of ICT.
The IICs can be set-up as a joint venture between public and private sector institutions and
provide a central information access point for citizens.
PricewaterhouseCoopers Page 208Confidential
D
Development of e-Government Strategy and Implementation Plan
These Information centers need to be located in every city.
Mobile Phone Solutions on PPP model
Mobile phones have a huge impact in developing countries like Ethiopia, substituting
for scarce fixed connections, reducing transaction costs, increasing mobility,
broadening trade networks, and facilitating searches for employment.
Currently there is a Mobile Governance initiative wherein a Private partner shall
provide SMS based informational services to the citizens. Government should
collaborate with private sector to utilize mobile telephony and take the ICT enabled
services out into the remote communities, enabling:
Women entrepreneurs to build a business as ‘village phone operators’
Farmers to make good choices based on market conditions
Rural poor to receive banking services they otherwise couldn’t access
PricewaterhouseCoopers Page 209Confidential
D
Development of e-Government Strategy and Implementation Plan
PPP Implementation Plan:
Table 38: PPP Implementation Roadmap
Sr#
Strategy Implementation Plan Timeline
1 Unified Billing System on PPP Model
RFP Evaluation and Contracting of Unified billing System (UBS) project in Addis Ababa for the following Utilities:The Addis Ababa Water & Sewage Authority (AAWSA);The EEPCO (Ethiopia Electric Power Company); andThe ETC (Ethiopia Telecommunications Corporation)
1 month
Program Management Unit of UBS to be setup
3 months
Pilot of UBS in 5 centers in Addis Ababa 6 monthsPilot of UBS across 70 centers in Addis Ababa
1 year
Initiation of UBS across multiple cities in Ethiopia. EOI and RFP process to be initiated across 4 regions- Diredawa,Mekelle, Awassa and Bahir Dar
6 months
Initiation of UBS in rural areas 1 yearExpansion of Utilities in UBS –Government housing Rent – city and federal governmentHousing Loan repayments to GovtBroadcasting PaymentTransport related paymentsSchool fees
2 years
2 Exploring PPP Opportunities
Identification of 3 ICT Services project to be rolled out on PPP Model
3 months
Schedule and Action plan for ICT Interventions for Private sector 6 months
3 Policies and Guidelines to enable PPP
PPP Guidelines for National Level 1 yearEstablishment of International ICT Trade panel to revise policies to support Foreign investment into ICT in Ethiopia.
3 months
Formulation of Preferential Taxation for Rural ICT Development
6 months
4 Business enablers to Establishment of Special Economic Zones to attract both domestic and Foreign ICT
1 year
PricewaterhouseCoopers Page 210Confidential
D
Development of e-Government Strategy and Implementation Plan
support partnerships companies with incentivesImplementation of payment gateway 2 yearsDevelopment of National Trade portal integrating all the businesses in Ethiopia
1 year
Integration of SMEs, Banks and Micro finance institutions, NGOs and donor organizations through ICT for effective funding and project executions
1 year
Integration of the Inventory of all the goods, Warehouses and building trade channels for Ethiopia both at domestic and foreign market
1 Year
Establishment of SME Support centers 1 Year
5 Development of Delivery Channels for both Citizens and Business on PPP Model
Informational and transactional Trade Portals
December 2011
PPP in implementing Citizen Service Electronic Kiosks to enable public and private e-services for citizens at national level
2 Year
Establish ICT Information Centers in all the Regions with coordination from the regional ICT Agencies
1 Year
SMS based public services on PPP model 6 monthsEstablishment of additional ICT Centers to deliver Citizen Services
1 year
Mobile Solutions on PPP Model 1 year
11 Training and Capacity Building with Partnerships from ICT Companies and Educational Institutes
Training for professionals/Students in ICT
Every 3 Months
ICT business training for SME in order to relate their business with ICT
Every 3 months
12 Establishment of Centers of Excellence on PPP model
ICT Research and Development Center 1 YearSetup of De-manufacturing centers 1 Yeare-Waste Management Center:Development of Regulation document and Implementation plan for e-Waste Management
1 Year
Establishment Incubation centers in all the remaining regions
1 Year
Refurbishment Centers for more ICT goods to provide affordable access to ICT
1 Year
PricewaterhouseCoopers Page 211Confidential
D
Development of e-Government Strategy and Implementation Plan
PricewaterhouseCoopers Page 212Confidential
D
Development of e-Government Strategy and Implementation Plan
Guidelines for leveraging PPP in Ethiopia
1. PPP projects should be initiated only after the same are examined by the technical committee and approved by the high committee. An indicative format in which such requests should be sent to the Technical Committee is placed below.
2. All projects proposed for PPP mode of implementation should undergo a comprehensive feasibility check and the value added by the private partner should be clearly articulated and quantified.
3. The proposed user charges and tariffs should be checked for appropriateness and acceptability of the users.
4. The process for the selection of the private partner should be clearly defined and notified to ensure that there is transparency in the selection process and the e-Government program does not get tarnished by allegations of corruption and partisanship.
5. A comprehensive Master Services Agreement with unambiguous timelines and service levels and penalties in case of non-adherence to the same must be signed with the private partner before initiating the project.
6. An annual review of the performance of the private partner must be conducted at the level of the high committee.
Table 39: Guidelines for leveraging PPP
1. General
1.1 Name of the Project
1.2 Type of PPP (BOT, BOOT, BOLT, OMT etc.)
1.3 Location (State/District/Town)
1.4 Administrative Ministry/Department
1.5 Name of Sponsoring Authority
1.6 Name of the Implementing Agency2. Project Description2.1 Brief description of the project
2.2 Justification for the project
2.3 Possible alternatives, if any
2.4 Estimated Capital costs with break-up under major heads of expenditure. Also indicate the basis of cost estimation.
2.5 Phasing of investment
2.6 Project Implementation Schedule (PIS)3. Financing Arrangements3.1 Sources of financing (equity, debt,
mezzanine capital etc.)3.2 Indicate the revenue streams of the
project (annual flows over project life). Also indicate the underlying assumptions.
3.3 Indicate the NPV of revenue streams with appropriate discounting
3.4 Who will fix the tariff/ user charges? Please specify in detail.
PricewaterhouseCoopers Page 213Confidential
D
Development of e-Government Strategy and Implementation Plan
1. General4. IRR4.1 Economic IRR (if computed)
4.2 Financial IRR, indicating various assumptions (attach separate sheet if necessary)
5. Clearances5.1 Status of environmental clearances
5.2 Clearance required from the State Government and other local bodies
5.3 Other support required from the State Government
6. Government of Ethiopia Support6.1 Viability Gap Funding, if required
6.2 Guarantees being sought, if any7. Concession Agreement7.1 Details of Concession Agreement7.2 Service levels and penalties8. Criteria for short-listing8.1 Indicate the criteria for short-listing
(attach separate sheet if necessary)
9. Others
9.1 Remarks, If any
PricewaterhouseCoopers Page 214Confidential
D
Development of e-Government Strategy and Implementation Plan
PricewaterhouseCoopers Page 215Confidential
Section 7 – IMPLEMENTATION PLAN & TIMELINES
D
Development of e-Government Strategy and Implementation Plan
VII. Over all Implementation Plan and Timelines
I. Overall Implementation Plan
Table 40 – Overall Implementation Plan
S.No. Yr. v/s Project
Implementation planYear 1 Year 2 Year 3 Year 4 Year 5
Agency Priority Projects
1 Agriculture ServicesAll information servicesAgricultural Services Management SystemPortal for all Agricultural services and information
2 Benefits Management systemSocial Benefits Portal with information regarding all welfare schemes
Pension Management systemSocial Benefits Management System
3 EducationEducation portalExam Management systemStudent Management SystemEducation Administration system
4 eHealthHospital Management PortalHospital Information Management System
Drug Information Management SystemIntegration of hospitals and pharmacies
5 E-TradeAll information regarding G2B services
PricewaterhouseCoopers Page 216Confidential
D
Development of e-Government Strategy and Implementation Plan
S.No. Yr. v/s Project
Implementation planYear 1 Year 2 Year 3 Year 4 Year 5
Investors Management systemTrade Management SystemEnterprise Management SystemIntegrated G2B portal
6 EmploymentEmployment portal with all information servicesEmployment Management System
7 Transport
Transport ministry portal including all information services and drivers licenses related servicesVehicle Registration Information systemOnline ticket booking systemGovernment Vehicles Insurance Management System
8 TourismAll information related to travel attraction, hotels etc.Travel Licenses Management SystemHospitality Management SystemTour Management System
Disaster Management systemGIS enabled Portal for Tourists
9 TaxCustom and Revenue Authority Portal (CRAP)Tax Management and Information System
10 e-CourtseCourt portal to provide informational services
PricewaterhouseCoopers Page 217Confidential
D
Development of e-Government Strategy and Implementation Plan
S.No. Yr. v/s Project
Implementation planYear 1 Year 2 Year 3 Year 4 Year 5
Case Management systemProperty and Land Management systemIntegration with Regional court and property systems
11 e-Municipality
Portal with all information services of the Municipality
Modules for certificate generation, tax collection, accounts and licenseGIS applicationProject Systems (for Water/Sewerage / Roads /Building etc.)Fleet Management SystemAsset and Material Management system
12 Passport & VisaPassport & Visa Management System
PricewaterhouseCoopers Page 218Confidential
D
Development of e-Government Strategy and Implementation Plan
S.No. Yr. v/s ProjectImplementation plan
Year 1 Year 2 Year 3 Year 4 Year 5Enablers
1Marketing and Awareness Campaign
Internal Awareness Campaign, FeelersTargeted Customer Campaigns
2 Capacity Building
Establishment of the Knowledge Management System
Design of Change Management Plan, Training CurriculaOperationalization of the ITSG
Courses for leadership, customer orientation, IT and project management etc.
3 Monitoring and EvaluationSetting up the M&E frameworkBaseline survey of government organizations and customers
Annual survey of government organizations and customers
PricewaterhouseCoopers Page 219Confidential
Design of annual plan for Marketing and awareness activities
D
Development of e-Government Strategy and Implementation Plan
S.No. Yr. v/s ProjectImplementation plan
Year 1 Year 2 Year 3 Year 4 Year 54 Standards and Policies
Selection of a consultant for setting up Standards and Policies
Identification of Standards, policies and guidelines required for implementation of the e-Government strategy
Phase - I of standards and policies implementationPhase - II of standards and policies implementationPhase - III of standards and policies implementation
5 Core ProjectsNational Data SetNational Enterprise Service BusNational Integrated Authentication FrameworkNational Payment GatewayPublic Key InfrastructureNational Data CenterWoredanet
PricewaterhouseCoopers Page 220Confidential
D
Development of e-Government Strategy and Implementation Plan
II. Sample Detailed Implementation Plan and RACI Chart for Education Priority project
Table 41 – Education Project Implementation Plan
S.No. Activities
Implementation plan - SBMSYear 1 Year 2 Year 3
0-6 mon 6-12 mon 12-18 mon18-24 mon
24-30 mon
30-36 mon
1Formation of the project team and selection of a project manager
2Meetings between the Project team and PMO to discuss the way forward
3
Preparation of Detailed Project Report including As-Is processes, To-be processes, detailed costing and implementation timelines
4 Review of the DPR and approval
5
Development of Benefits management portal to put all informational services related to benefit schemes online and for the development of Pension Management System
5.1Preparation of the RFP for the selection of vendor
5.2 Review and finalization of RFP
5.3Bid process management leading to selection of the vendor
5.4 Project implementation kickoff5.5 Application Development5.6 Testing5.7 Training of the Staff5.8 Go live5.9 Sub-project closure and learning report
6Development of comprehensive Social Benefits Management System
PricewaterhouseCoopers Page 221Confidential
D
Development of e-Government Strategy and Implementation Plan
S.No. Activities
Implementation plan - SBMSYear 1 Year 2 Year 3
0-6 mon 6-12 mon 12-18 mon18-24 mon
24-30 mon
30-36 mon
6.1Preparation of the RFP for the selection of vendor
6.2 Reviezxw and finalization of RFP
6.3Bid process management leading to selection of the vendor
6.4 Project implementation kickoff
6.5Application Development and integration with Pension Management System
6.6 Testing6.7 Training of the Staff6.8 Go live6.9 Sub-project closure and learning report7 Project Closure Report
Implementation Plan detail for Education Ministry priority project
Education Ministry priority project has 4 main components or sub-projects – Education Portal, Exam management System, Student management System and Education Administration System. As per the proposed implementation plan – the portal implementation may be spread out over years 1 and 2, while the Exam management system may be implemented in 1st Year and the Education Administration System implementation (automating the entire functioning of the ministry) is proposed over years 2 and 3.
A RACI chart is detailed below clearly showing the implementation plan – for the Exam management system project. The same chart may be followed for all projects.
PricewaterhouseCoopers Page 222Confidential
D
Development of e-Government Strategy and Implementation Plan
The RACI Chart is used to clarify roles and responsibilities in the project implementation. It is a table that provides the list of activities and information about roles different people have in relation to those activities. For each activity, different people are assigned different roles as per “RACI”. This acronym stands for (i) Responsible, or the person doing the work; (ii) Accountable, or the person responsible for making sure the work is done adequately; (iii) Consulted, or the person(s) who is asked for their input; and (iv) Informed, or the person(s) who must be told about the work.
No Activity/Task Responsible Accountable To Consult To Inform Remark/Comment
Guidelines documents/templates reference(s)
Formation of the project team and selection of a project manager
Education Ministry
E-Gov. Strategy PMO
E-Gov. Strategy Technical Committee
E-Gov. Strategy High Committee
Meetings between the Project team and PMO to discuss the way forward
Ministry project team
E-Gov. Strategy PMO
E-Gov. Strategy Technical Committee
Preparation of Detailed Project Report including As-Is processes, To-be processes, detailed costing and implementation timelines
Ministry project team
E-Gov. Strategy PMO
E-Gov. Strategy Technical Committee
DPR format provided in the E-Gov. Strategy Report
Review of the DPR and approval
E-Gov. Strategy PMO
E-Gov. Strategy Technical Committee
E-Gov. Strategy High Committee
Project Sponsor / Council of Ministers
E-Gov. Strategy High committee will approve the report
Development of Exam
PricewaterhouseCoopers Page 223Confidential
D
Development of e-Government Strategy and Implementation Plan
No Activity/Task Responsible Accountable To Consult To Inform Remark/Comment
Guidelines documents/templates reference(s)
management SystemPreparation of the RFP for the selection of vendor
Ministry project team
E-Gov. Strategy PMO
E-Gov. Strategy High Committee
Depending on the funding source of the project, the RFP may be prepared in the applicable format – Example – If it is funded by Govt. funds, the RFP best practices document template may be usedor If project is funded by World bank or other such Institution then the RFP template of the funding institution will need to be used.
- RFP Best practices document provided by PwC- World Bank or other funding Institution RFP template
Review and finalization of RFP
E-Gov. Strategy PMO
E-Gov. Strategy Technical Committee
E-Gov. Strategy High Committee
E-Gov. Strategy High committee will approve the RFP
PricewaterhouseCoopers Page 224Confidential
D
Development of e-Government Strategy and Implementation Plan
No Activity/Task Responsible Accountable To Consult To Inform Remark/Comment
Guidelines documents/templates reference(s)
Bid process management leading to selection of the vendor
Ministry project team
E-Gov. Strategy PMO
E-Gov. Strategy Technical Committee
E-Gov. Strategy High Committee
The technical committee may approve the vendor selection
The High committee will be informed about the vendor selection and give final approval
Selection criteria as per approved RFP
Model Template (Excel Sheet) for evaluation of proposals submitted by PwC
Project implementation kickoff
Ministry project team
E-Gov. Strategy PMO
Application Development
Selected vendor
Ministry Project Team
E-Gov. Strategy PMO
E-Gov. Strategy High Committee
E-Gov. Strategy High Committee
Direct supervision of Application development will be done by Ministry project team and PMO
Technical committee will be closely guiding this activity and will resolve any technical issues
Software Project Management Guidelines provided by PwC
Project Management Guidelines templates provided by PwC
PricewaterhouseCoopers Page 225Confidential
D
Development of e-Government Strategy and Implementation Plan
No Activity/Task Responsible Accountable To Consult To Inform Remark/Comment
Guidelines documents/templates reference(s)
in implementation and also be responsible for approving final sign –off of all documentation like SRS, test plan, acceptance test reports, etc.
The High committee will be kept informed of the progress and resolve any administration issues like scope increase, cost increase etc.
Testing Selected vendor
Ministry Project Team
E-Gov. Strategy PMO
E-Gov. Strategy Technical Committee
E-Gov. Strategy High Committee
High-Committee may be kept informed about testing progress and reports
Testing guidelines document provided by PwC
Training of the Staff Selected vendor
Ministry Project Team
E-Gov. Strategy Technical
E-Gov. Strategy High
High-Committee may be kept informed about
Training plan and material prepared by vendor and as
PricewaterhouseCoopers Page 226Confidential
D
Development of e-Government Strategy and Implementation Plan
No Activity/Task Responsible Accountable To Consult To Inform Remark/Comment
Guidelines documents/templates reference(s)
E-Gov. Strategy PMO
Committee Committee training plan & progress
approved by Technical Committee
Go live Selected vendor
Ministry Project Team
E-Gov. Strategy PMO
E-Gov. Strategy Technical Committee
E-Gov. Strategy High Committee
High-Committee will be kept informed about project go-live date
Project closure and learning report
Ministry project team
E-Gov. Strategy PMO
E-Gov. Strategy Technical Committee
E-Gov. Strategy High Committee
The high committee will be kept informed about any special lessons learned from the project implementation – like in case of any scope increase or cost increase which may have been better controlled
PricewaterhouseCoopers Page 227Confidential
D
Development of e-Government Strategy and Implementation Plan
III. Portal Implementation Plan and Timelines
Table 42 – Portal implementation Plan
e-Government Portal for EthiopiaS.No Key Activities Year I Year II Year III Year IV Year V
1Design of portal and content management
1.1Identify a team to upgrade the existing e-Government portal
1.2 Develop portal charter
1.3
RFP for the selection of a vendor for development of a new portal and to develop content for the portal
1.4Appointment of the vendor for portal design and content
1.5Requirements gathering by the vendor
1.6 Conference room pilot1.7 Development of FRS and SRS
1.8Development of the new portal and content
1.9
Development of Standard operating procedures and content management processes for the portal
1.10Testing and review of content
1.11 Go-live
2Development of 46 e-Services for first year
2.1Requirements gathering by SDA
2.2Preparation of SRS and FRS by the SDA
PricewaterhouseCoopers Page 228Confidential
D
Development of e-Government Strategy and Implementation Plan
e-Government Portal for EthiopiaS.No Key Activities Year I Year II Year III Year IV Year V
2.3Development of the e-Services
2.4
Portal Infrastructure augmentation for new e-Services
2.5 Testing of the Services
2.6
Training of the government employees that provide these services
2.7 Go-Live of the portal2.8 Closure of the sub-project
3Development of Grievance Redressal System
3.1
Identification of team of officials from various departments for development of the grievance redressal system
3.2
Meeting between PMO and the identified team to understand the requirements for Grievance redressal system
3.3
Identification of officials in every department to whom the grievance redressal requests of their departments would be directed to
3.4
Development of FRS and workflow for the Grievance Redressal system
3.5Approval of the FRS and workflow
PricewaterhouseCoopers Page 229Confidential
D
Development of e-Government Strategy and Implementation Plan
e-Government Portal for EthiopiaS.No Key Activities Year I Year II Year III Year IV Year V
3.6
Development of the Grievance redressal system by the programmers at MoICT
3.7 Testing
3.8Go-Live of the Grievance Redressal System
4
Addition of e-Services to the e-Government Portal as per the go-live of e-Services through the Agency Priority Projects
PricewaterhouseCoopers Page 230Confidential
D
Development of e-Government Strategy and Implementation Plan
IV. ICT Center Implementation Plan and Timelines
Table 43 – ICT Centre Implementation Plan
e-Government ICT CentresS.No Key Activities Year I Year II Year III Year IV Year V
1
Identify a team to upgrade the existing ICT Centres for delivering the e-Services
2Study the existing ICT Community Centre and Unified Billing Centre
3
Study the existing services delivered through the 65 ICT Community Centres and 70 UBS
4Study the existing infrastructure in the Centres
5
Undertaking a Feasibility Study on the type of services that could be delivered these Channels
6
Identification of the extra number of centres required to cover all the regions
7Design a Business Model for the Centres for delivering the services
8
Design the Standardization requirements in terms of Services, Infrastructure and Staff cross the Centres
9
Design a RFP for selection of an agency for establishing the extra channels or identify community partners for the same
10Design the funding requirements of the Centres
11 Establishment of the new ICT
PricewaterhouseCoopers Page 231Confidential
D
Development of e-Government Strategy and Implementation Plan
e-Government ICT CentresS.No Key Activities Year I Year II Year III Year IV Year V
Centres and upgradation of the existing for delivering the e-Services
12Training of the employees of the ICT centres
13 Operationalization of the ICT Centre
14Delivery of the e-Services - Informational
15Delivery of the e-Services - Transactional
16Establishment of a Monitoring and evaluation Framework
17Monitoring the SLAs of the ICT Centres
18 Monitoring the Channel Uptake
19
Incremental upgradation of the Channel based on the uptake and Feedback received
20Conduct Customer satisfaction survey for the ICT Centre
21Revised the Channel Strategy based on survey results
22 Study the Impact of the Channel
PricewaterhouseCoopers Page 232Confidential
D
Development of e-Government Strategy and Implementation Plan
V. Contact Center Implementation Plan and Timelines
Table 44 – Contact Center Implementation Plan
e-Government Contact Centre for EthiopiaS.No Key Activities Year I Year II Year III Year IV Year V
1
Identify a team to upgrade the existing Contact Centre for delivering the e-Services
2Study the learnings from the existing Contact Centre
3Design a Business Model for a Private Sector Participation
4Identify the services that needs to be delivered through the Channel
5
Design the scope of work for a private agency sector for development of the Contact Centre
6Design the workflow for delivering the e-services through the Contact Centre
7Conduct a Cost benefit Analysis for creation of the Channel
8Conduct Customer satisfaction survey for the Contact Centre Channel
9Bid process Management for selection of the Agency
10Design the requirements of the Contact Centre Inbound/outbound Software
11Design the SRS for the Contact Centre Software
12 Develop the Contact Centre Software13 Installation of the Contact Centre Software
14Training of all the Contact Centre Employees
PricewaterhouseCoopers Page 233Confidential
D
Development of e-Government Strategy and Implementation Plan
e-Government Contact Centre for EthiopiaS.No Key Activities Year I Year II Year III Year IV Year V15 Operationalization of the Contact Centre16 Delivery of the e-Services - Informational17 Delivery of the e-Services - Transactional
18Establishment of a Monitoring and evaluation Framework
19 Monitoring the SLAs of the agency20 Monitoring the Channel Uptake
21
Incremental upgradation of the Channel based on the uptake and Feedback received
22Conduct Customer satisfaction survey for the Contact Centre Channel
23Revised the Channel Strategy based on survey results
24 Study the Impact of the Channel
25Design the Sustainability Options after the term of the Agency is completed
PricewaterhouseCoopers Page 234Confidential
D
Development of e-Government Strategy and Implementation Plan
VI. Mobile Implementation Plan and Timelines
Table 45 – Mobile Implementation Plan
Mobile Portal for Ethiopia
S.No Key Activities Year I Year II Year IIIYear IV
Year V
1
Identify a team responsible for the implementation of the mobile gateway
2
Contact ETC to appoint a nodal officer to assist in the implementation of this initiative
3Identify the services to be delivered through the mobiles
4Capture the learning from the pilot project
5
Design the scope of work for a private agency sector for development of the Contact Centre
5.1
Develop Terms of Reference and issue an Expression of Interest seeking solution design, architecture, bill of materials and services enablement plan for the mobile gateway
5.2Shortlist the vendors based on the quality of the EoI response
5.3
Use the EoI responses to draft an RFP with well defined scope of work
5.4Issue the RFP to the shortlisted bidders
5.5Bid process Management for selection of the vendor
5.6 Assessment of the services for
PricewaterhouseCoopers Page 235Confidential
D
Development of e-Government Strategy and Implementation Plan
Mobile Portal for Ethiopia
S.No Key Activities Year I Year II Year IIIYear IV
Year V
feasibility and any changes in processes for phase 1
5.7Development of content for the mobile gateway
5.8 Testing5.9 Go-live5.1
0 Capture learning of phase 15.1
1 Closure of phase 1
6Phase 2 for introduction of additional services
7Phase 3 for introduction of additional services
PricewaterhouseCoopers Page 236Confidential
D
Development of e-Government Strategy and Implementation Plan
VII. Capacity Building Implementation Plan and Timelines
Table 46 – Capacity Building Implementation Plan
Implementation plan - Capacity Building
S.No Key Activities Year I Year IIYear III
Year IV Year V
1
Identify a team responsible for the implementation of capacity building initiatives within the Government
2 Creation of a IT Services group
2.1Framing the roles and responsibilities of the ITSG
2.2
Defining the organization structure, no. of resources, qualifications required and job descriptions
2.3Identification of the staff within government that can fill up these positions
2.4
Permission from relevant authorities to explore the option of forming a joint venture company for ITSG to source resources that are not available within the government
2.5Development of an EoI to invite private partners for the JV
2.6Shortlisting of vendors based on their responses
2.7RFP and bid process management for the selection of private partner
2.8Formation of the JV and incorporation as a separate company
3Training Needs Assessment and preparation of training curriculum
3.1
Identification of various categories of officials as per their needs for using IT, project management, customer service skills and providing leadership
PricewaterhouseCoopers Page 237Confidential
D
Development of e-Government Strategy and Implementation Plan
Implementation plan - Capacity Building
S.No Key Activities Year I Year IIYear III
Year IV Year V
3.2
Survey to understand the present level of proficiency of the target groups in the skill areas identified as relevant for performing their jobs
3.3Design of course curriculum based on survey results
3.4
Development of e-learning modules for delivery to augment instructor led training
3.5 Training based on the training modules4 Strengthening of IT Training infrastructure
4.1Identification of training institutes to be leveraged for providing training
4.2
Define minimum infrastructure and other facilities to be available at these training institutes
4.3Assessment of the present infrastructure of the identified institutes
4.4Provisioning funds to these institutes for strengthening infrastructure
4.5Development of the requisite infrastructure
4.6
Augmentation of infrastructure for scaling up the operations and any required improvements
5Development of Ethiopian Government Knowledge Management Portal
5.1Development of a DPR for the project by PMO
5.2 Approval of the DPR
5.3
Issue of RFP for the selection of an implementation agency to develop the KM portal
5.4 Bid process management leading to
PricewaterhouseCoopers Page 238Confidential
D
Development of e-Government Strategy and Implementation Plan
Implementation plan - Capacity Building
S.No Key Activities Year I Year IIYear III
Year IV Year V
appointment of an agency for implementing KM portal
5.5 Development of the portal5.6 Procurement of hardware for the portal5.7 Testing5.8 Go-Live
5.9
Project closure and learning report along with recommendations and best practices to ensure that the KM portal serves its purpose as one single source of information for government staff
5.10
Awareness campaign within the government departments for contributing towards and using the KM portal
6Arrangement of Tours, seminars and conferences
6.1
Identification of countries, institutions, conferences and events across the world that can be studied to improve the understanding of e-Government amongst officials
6.2 Identifications of officials for these tours
6.3Compendium of learning from each of these activities
PricewaterhouseCoopers Page 239Confidential
D
Development of e-Government Strategy and Implementation Plan
VIII. Marketing and Awareness Plan and Timelines
Table 47 – Marketing and Awareness Implementation Plan
Implementation plan - Marketing and AwarenessS.No Key Activities Year I Year II Year III Year IV Year V
1
Identify a team responsible for the implementation of Marketing and awareness campaign
2Development of RFP for the selection of Marketing and PR partner
3
Issue of the RFP after approval from authorities and bid process management leading to the appointment of the marketing and PR partner for e-Government strategy implementation
4Development of a distinctive theme, branding and symbol for e-Government
5
Workshops with all government organizations to make them aware regarding the branding guidelines for e-Government strategy
6
Discussions with the owner agencies of Agency priority projects whose services will be enabled online during the year
7Development of annual plan for Marketing and Awareness
8
Development of marketing material for new services including content for bill boards, newspapers, TV and Radio ads etc.
9
Identification of private partners and other innovative means for funding the marketing and awareness program
PricewaterhouseCoopers Page 240Confidential
D
Development of e-Government Strategy and Implementation Plan
IX. Public Private Partnership - Plan and Timelines
Table 48 – Public Private Partnership Plan
S.No ActivitiesYear 1 Year 2 Year 3
0-6 mon
6-12 mon
12-18 mon
18-24 mon
24-30 mon
30-36 mon
1
Formation of the project team in charge of PPP Initiatives and selection of a project manager
2
Meetings between the Project team and PMO to discuss the key PPP Initiatives with ETC, Banks, Educational Institutes, Private Sector and Healthcare Institutions
3
Preparation of Detailed Project Report including As-Is processes, To-be processes, detailed costing and implementation timelines.
4
Review of the DPR and approval. Funding road shows and Workshops for generating the required funding.
5
Development of e-Procurement portal to put all informational services related to Public Private Partnerships and Government Tenders
5.1Preparation of the RFP for the selection of vendor
5.2 Review and finalization of RFP
5.3Bid process management leading to
selection of the vendor5.4 Project implementation kickoff5.5 Application Development5.6 Testing5.7 Training of the Staff5.8 Go live5.9 Sub-project closure and learning report6 Development of ICT Centers6.1 Preparation of the RFP for the selection
PricewaterhouseCoopers Page 241Confidential
D
Development of e-Government Strategy and Implementation Plan
S.No ActivitiesYear 1 Year 2 Year 3
0-6 mon
6-12 mon
12-18 mon
18-24 mon
24-30 mon
30-36 mon
of vendor6.2 Review and finalization of RFP
6.3Bid process management leading to
selection of the vendor6.4 Project implementation kickoff
6.5ICT Center Development and integration
with e-Government Services6.6 Testing6.7 Training of the Staff6.8 Go live6.9 Sub-project closure and learning report7 Development of ICT Incubation Centers
7.1Preparation of the RFP for the selection
of vendor7.2 Review and finalization of RFP
7.3Bid process management leading to
selection of the vendor7.4 Project implementation kickoff
7.5
ICT Incubation Center Development and initial setup of Entrepreneurial Ventures at the Center
7.6 Testing7.7 Training of the Staff7.8 Go live7.9 Sub-project closure and learning report
8
Implementation of key PPP Projects in collaboration with ETC, Banks, Educational Institutes, Private Sector and Healthcare Institutions. Note: The period of the Partnership and the term of the contract shall depend on the type of PPP Models. Generally the PPP BOOT Model shall be implemented for a period of 3- 5 Years.
8.1 Preparation of the RFP for the selection
PricewaterhouseCoopers Page 242Confidential
D
Development of e-Government Strategy and Implementation Plan
S.No ActivitiesYear 1 Year 2 Year 3
0-6 mon
6-12 mon
12-18 mon
18-24 mon
24-30 mon
30-36 mon
of vendor8.2 Review and finalization of RFP
8.3Bid process management leading to
selection of the vendor8.4 Project implementation kickoff8.5 Project implementation and Tracking8.6 Testing8.7 Training of the Staff
8.8Go live( This period would depend on the
duration and Type of the PPP Contract)8.9 Sub-project closure and learning report
PricewaterhouseCoopers Page 243Confidential
D
Development of e-Government Strategy and Implementation Plan
Section 8 – FUNDING
D
Development of e-Government Strategy and Implementation Plan
VII. Cost Estimation & Funding
I. Budgetary Estimates
The proposed e-Government Strategy budget of Birr 3.33 billion for 5 years or Birr 0.67 billion / year compares with Birr 2.13 billion/ year and Birr 10.13 billion / year for Health and Education sector respectively. The proposed budget for the e-Government strategy will entail less than 1% of the overall budget of Government of EthiopiaSummary of the Cost Estimates of the various initiatives proposed is as below –
Table 49 – e-Government Strategy – Summary of Costs
Ethiopia eGovernment Strategy - Costing Summary
S.No.
Initiatives
Year 1 (In Birr.)
Year 2 (In Birr.)
Year 3 (In Birr.)
Year 4 (In Birr.)
Year 5 (In Birr.)
1
Agriculture Services
15,514,298
4,893,316
4,466,779
4,687,683
4,294,225
2
Benefits Management System
17,442,654
4,269,715
3,954,873
4,124,957
3,833,491
3Education
23,829,430
7,420,991
6,080,086
6,337,290
5,036,393
4 eHealth 23,529,430
7,090,991
5,717,086
5,937,990
4,597,163
5G2B Portal
4,759,002
1,197,989
1,223,221
1,303,081
1,343,558
6Employment
17,287,346
4,946,355
4,335,524
4,527,388
3,944,091
7 Transport 20,203,136
5,553,724
5,166,787
5,431,251
5,085,709
8 Tourism 15,502,509
5,427,716
5,056,619
5,338,507
5,012,131
9 Tax 21,420,680
5,889,513
5,344,682
5,609,146
5,105,709
10 e-Court 14,758,509
4,609,316
4,156,379
4,348,243
3,922,841
11Municipalities
17,767,346
5,474,355
4,916,324
5,166,268
4,646,859
12 Passport 16,228,048
5,672,355
5,134,124
5,405,848
4,910,397
12
eGovernment Portal
10,097,895
4,197,158
4,537,137
4,910,285
5,319,877
13Contact Center
29,199,123
29,240,352
32,112,471
35,270,474
38,742,883
14Mobile Gateway
4,520,000
4,235,509
3,226,291
3,489,082
3,776,991
15
Common Service Center
718,243,842
326,899,053
355,121,309
386,036,106
419,906,215
16 Capacity
PricewaterhouseCoopers Page 245Confidential
D
Development of e-Government Strategy and Implementation Plan
Building 14,716,421 6,329,996 6,702,958 7,204,999 7,750,824
17
Marketing & Awareness
10,163,170
10,810,802
11,504,763
12,248,764
13,046,842
18
Standards & Policies
5,021,754
5,509,684
6,045,695
6,634,558
7,281,523
19
Enterprise Architecture
5,081,667
435,000
257,000
257,000
257,000
20 NIAF 33,788,816
500,000
500,000
500,000
500,000
21 NSEB 20,595,316
-
-
-
-
22 NDS 36,676,316
-
-
-
-
23 NPG 28,076,316
-
-
-
-
24
PKI( Design and implementation as per the design by external consultant)
124,754,500
25 HRMS 16,243,211
1,473,684
1,473,684
1,473,684
1,473,684
26
e-Procurement System
15,022,158
252,632
252,632
252,632
252,632
27e-Office System
15,022,158
252,632
252,632
252,632
252,632
28
Financial Manangement Information System
4,319,058
-
-
-
-
29
Email Management System
14,769,526
-
-
-
-
30
ITSG Manpower costs
1,500,000
3,300,000
3,630,000
3,993,000
4,392,300
31
PMO staffing costs
1,860,000
2,706,000
2,976,600
3,274,260
3,601,686
Total
PricewaterhouseCoopers Page 246Confidential
D
Development of e-Government Strategy and Implementation Plan
1,317,913,633
458,588,838
484,145,652
524,015,128
558,287,654
Grand Total
3,328,181,379
Grand Total (in USD) 201,463,764
Details of the Costing is provided in Annexure XVII
PricewaterhouseCoopers Page 247Confidential
D
Development of e-Government Strategy and Implementation Plan
II. Funding Framework
To enable proper implementation of the Strategy Program, a proper funding and spending system needs to be developed, approved and implemented to ensure that the funds are sufficiently allocated for the different development domains. Funding options need to be considered carefully to ensure that
Transparency and accountability is maintained in allocation and utilization of funds Adequate funds are available for the implementation of the project utilization of allocated funds is monitored Strategic control of the government is maintained
E-Government Strategy funding and spending process and the life cycle across the different stages of IT initiatives are explained in the pages that follow. More specifically the following areas have been addressed:
Funding options identified during the Assessment Phase and the planning activities. Funding and Spending Framework including percentages distribution and link to
Governance Structure Fund allocation and utilization process for core, common, Ministry/Agency specific
and Ministry/Agency owned initiatives. The annual procedure for short-listing vendors.
The key options available for MOCIT to fund the Strategy are:
Figure 31: Key Options for MOCIT
OPTION 1 (Conventional) - Government Funded: The source of the fund is the Government annual budget, where the Government of Ethiopia invests the whole project/initiative amount as capital expenditure
OPTION 2 - International Funding Agencies: Several international donor agencies provide financial support to development projects in developing countries. Bilateral development agencies facilitate the provision of grants and loans from one national government to other governments or NGOs in order to help implement development projects. Multilateral development agencies also provide resources and carry out development projects with governments and NGOs and include numerous UN agencies (such as UNDP, UNFPA, UNIFEM), development banks (such as the World Bank, African Development Bank), and other inter-governmental bodies
OPTION 3(PPP) - Public Private Partnerships: Government and Private sector can collaborate on different models for the implementation and success of the model
PricewaterhouseCoopers Page 248Confidential
D
Development of e-Government Strategy and Implementation Plan
(BOT) – Build Operate and Transfer (BOT): For some of the initiatives the private sector can build the infrastructure, own the operations for a fixed period of time and transfer it to government once the fixed period is over.
OPTION 4 (Privatise) – In a longer timeframe when the system is mature and basic infrastructure is in place, some of the services can be completely privatised where Government funding will not be done and it will be controlled by parties in private sector
The various funding options mentioned above differ in terms of the ownership by Government and the risk transferred to the private sector as shown in the diagram below
Figure 32: Government Control/Risk
Some of the key factors to be considered during the design include: The e-Government Program will be initially funded through Government funds. Other funding options (mainly BOT and Funding Agencies) can be explored in parallel PPP can be consider at a later stage once PPP models become more mature in Ethiopia Privatization is a long term target that can start once services have taken a mature
shape or became well defined.
PricewaterhouseCoopers Page 249Confidential
D
Development of e-Government Strategy and Implementation Plan
III. Program funding Options
The E-Government Strategy implementation may be funded by a combination of funding sources – including Government’s own budgetary allocations, finance from multilateral institutions like the World Bank or by partnering with the private sector.
Partnering with the private sector would provide a two-fold benefit – in terms of providing finance as well as it will help the development of the private sector and develop indigenous capacity and skills.
60%20%
20%
Funding Source
Funding Agency PPP Government
The above diagram depicts the probable quantum of funding of the E-Government strategy program from different sources, including Government funds, institutions like the World Bank and through the PPP (Public-Private Partnership) route. The table below provides the amounts which could be funded by the different entities.
Table 50 – Funding Options
Funding Options Amount( in Birr) Amount(in USD
Funding Agencies 1,996,908,827 120878258
PPP 665,636,276 40292753Government 665,636,276 40292753
PricewaterhouseCoopers Page 250Confidential
D
Development of e-Government Strategy and Implementation Plan
Savings through PPP- IndicativeAs mentioned earlier, partnering with the private sector for implementation of the program – will not only help in funding but will also develop the indigenous private sector. The different projects – including the identified priority projects and the channels could be implemented in PPP mode.
Assumption: Since the number of transactions for the Ministries/Agencies was not available, it has been assumed that in projects related to development sectors such as health, education, social and labor etc, where Government has a larger and more important mandate, and the there will low or no service charges the PPP participation may be around 10%. However in projects such as E-Trade, Tax, Municipalities, Tourism – where transactions are more and service charges could be collected the PPP participation may be around 20%.
Based on above assumptions, following table depicts some of the possibilities of PPP funding of the program, including savings in investment, which may accrue to the Government.
Table 51 – PPP Options
Sr. No. Project Estimated Cost (Mil. Birr)
PPP Investment(i.e. savings in investment for Government)
PPP Participation of 10%
1 Agriculture 33.86 3.39
2 Benefits Management 33.63 3.36
3 Education 48.70 4.87
4 Health 46.87 4.69
5 Employment 35.04 3.50
6 E-Court 31.80 3.18
PPP Participation of 20%
7 E-Trade 9.80 1.96
8 Transport 41.44 8.29
9 Tourism 36.34 7.27
10 Tax 43.37 8.67
11 Municipalities 37.97 7.59
12 Passport 37.35 7.47
13 Portal 29.06 14.77
14 Contact Centre 164.57 106.13
15 Mobile Gateway 19.25 14.73
16 Common Service Centres 2206.21 1103.11
PricewaterhouseCoopers Page 251Confidential
D
Development of e-Government Strategy and Implementation Plan
Total 2855.26 1302.98
PricewaterhouseCoopers Page 252Confidential
D
Development of e-Government Strategy and Implementation Plan
PPP participation in Channels development:
The cost estimates for the development of the different channels have been made, as in other cases, for a five year period. However, it is expected that private participation would commence from year 3 in case of Portal and Call centre and from year 2 in case of Mobile gateway. The CSCs are proposed to be implemented on PPP model itself – though implementation would start from year 2 – after completion of tendering and selection.
The PPP investment contribution for the channels in above table, has accordingly been estimated for
- Years, 3,4,5 in case of Portal & Call centre- Years 2,3,4,5 in case of Mobile Gateway- Years 1,2,3,4,5 in case of CSCs
Thus it can be observed that out of total funding requirement of 3.33 Bil. Birr almost 40% amounting to 1302.98 Mil. Birr, could be funded by partnering with the private sector. It is important that the Government consider this approach for implementation, because as mentioned earlier, partnering with private sector is expected to provide multi-fold benefits for the country’s development.
IV. Fund Management Framework (FMF)
In developing the FMF several variables were discussed and analysed. The major variables are mentioned below:
1. The size of the fund 2. The distribution of the fund among the different initiatives (central/Ministry/Agency) 3. The approval process
To recommend the target framework, the following factors were taken into consideration: Governments across the world are spending 3 to 5 per cent of their total annual budget
on modernization efforts; these Governments are of varying levels of maturity and thus require different budget allocations.
Modernizing Government of Ethiopia requires work on the center level and on the Ministries/Agencies level as well, the investment for the center will be larger during the Program initial stages
As the Program develop, tendency will be towards automating work in the Ministries/Agencies, this will mandate allocating more fund to the center where the center would have reached a good level of maturity
There will be expenses associated with allocating resources to do designs and evaluations for implementations to come, studies will have to be conducted to evaluate the need and the shape of certain projects. These resources can be MOCIT internal resources or external third party resources
In general fund will be utilized for approved projects as detailed in the e-Government Strategy, however, there will be instances where new requirements might arise and these will need to be tackled properly.
There should be a system for allocations approval that complies with the Government policies and procedures.
PricewaterhouseCoopers Page 253Confidential
D
Development of e-Government Strategy and Implementation Plan
The diagram below describes the FMF, in which it was assumed that 1% of the annual budget will be allocated for e-Government Strategy Implementation.
Figure 33: Fund utilization framework
The diagram above describes the framework that is proposed for the fund allocation for the e-Government Strategy. Important points include: It has been assumed that the process for approval of budget will follow the normal cycle
within Ethiopian financial year. There will be a fraction of total budget which will be allocated for the implementation of
e-Government Strategy. As mentioned previously it is assumed this fraction will be 1% of the total Ethiopia budget.
Once the fund is approved it will be allocated under two separate categories as described below: 1. Central Fund: This fund will be allocated for the implementation of core and
common initiatives which include the shared infrastructure components and the common applications. These components will be used by the different Government Ministries/Agencies.
2. Ministries/Agencies Fund: This fund will be allocated specifically for the initiatives to be implemented by Ministries. The fund under this category will be allocated to Ministries for the implementation of new or approved initiatives. A pre approved list of initiatives will be within the Entity roadmap and annual IT plan, however, the need for other non-planned deployments might arise during the year,
PricewaterhouseCoopers Page 254Confidential
D
Development of e-Government Strategy and Implementation Plan
these new requirements will be assessed and if given high priority will be allocated a fund from the Entity fund if sufficient amounts are available.
Note: The process of utilization of fund or ‘spending processes will follow the existing Ministry of Finance and Economic Development procedure. However, the process will be managed by MOCIT for Core and Common initiatives and by Ministries/Agencies for specific initiatives.
The Central and Ministry/Agency funds will be divided under the following categories for administrative and accounting purposes
Table 52: Categories of fund
S.No.
Category Details
1. Research and Development
Ministries/Agencies may need support from experts outside the Government to analyze ‘new initiatives’ and to prepare DPR for the fund allocation. This fund can be utilized by Ministries/Agencies to hire an external agency with support from PMO
2. Core and Common Initiatives
This fund will be allocated for the implementation of core and common initiatives.
3. New Initiatives This fund will be allocated for the implementation of the ‘new initiatives’ that were not pre-planned.
4. Approved Initiatives This fund will be allocated to Ministries/Agencies for the implementation of ‘approved initiatives’
Considering the Governance Structure, the approval for allocation of fund and the review of proposal will be owned by different organizations within the structure for control purposes, these are described in the table below.
Table 53: Approval for allocation
S.No.
Initiative Category
Initiative Value
Implementation Owner
Monitoring role
Supporting Role
Approval for allocation of fund
1 Core and common
value>X MOCIT MOCIT(PMO)
Technical Committee
High Committee
Value< X
Technical Committee /MOCIT
2 Ministries/Agencies Specific
Value > X
Ministry/Agency
MOCIT(PMO)
Technical Committee
High Committee
Value< X
Technical Committee
PricewaterhouseCoopers Page 255Confidential
D
Development of e-Government Strategy and Implementation Plan
/MOCIT
3 Ministry/Agency Owned
Value > X
Ministry/Agency
MOCIT(PMO)
Technical Committee
Technical Committee/ High Committee
Value< X
MOCIT
V. Fund Allocation Process
Allocation of Funds for implementation of the 31 Projects will be done Centrally Ministries/Agencies to prepare Detailed Project Report with the assistance from
ITSG. The various details to be covered under DPR are mentioned in the following sections and the Detailed Project Report – Template has been provided in Annexure V.
Funding Approval will be done by the High Committee Responsibility for Implementation of the Projects lies with the Implementation
Ministry/ Agency Fund Management and Review will be done by the PMO The proposal/DPR will be reviewed by PMO and the recommendations/review
comments will be shared with the owner of initiative for further refinement will approve/reject the allocation of fund.
High Committee will consolidate the list of approved initiatives and will finalize the fund allocation.
The consolidated report will be shared with High Committee and fund approval process will follow the existing Budgeting procedures
Guidelines
Project Case Formulation
Compliance with Guidelines and Procedures - The DPR to be submitted by the Implementation Entity should contain the following details:
Project Description, including clear definition of the citizen/business need that it is fulfilling and service standards sought to be achieved
How the project is leveraging existing and proposed infrastructure created by other initiatives
Project Funding sought
Breakdown of costs including Hardware, Software, Systems Development, Communications Connectivity, Personnel, Training, Civil Works, Materials and supplies, Taxes, Contingency Costs and Other Significant costs.
Projected Cash Flows (if any)
Ability to support PPP and Initiatives taken
PricewaterhouseCoopers Page 256Confidential
D
Development of e-Government Strategy and Implementation Plan
Proposed Implementation Plan including Timeline
Key risk factors
Appraisal and Approval of Project Proposals
The Project DPR would be prepared by the implementing Ministry/Agency along the guidelines established by MOCIT
The PMO would assist the implementing Ministry/Agency in filling the DRP
The PMO would assist the High Committee in reviewing the projects and facilitating approval for both Central and Ministry/Agency initiatives
The factors that need to be considered while evaluating projects include:
• Purpose and context -reflects e-Government strategy objectives
• Cost-benefit analysis
– Analysis of benefits in terms of envisaged citizen/business services
– The solution is practical and cost effective
– The project envisages infrastructure built by existing/proposed projects
– The project leverages Government funding with private resources
– The project leverages private sector skills
• Proposed implementation plan is realistic and reasonable
• Project management capacity
• Requisite skills to manage the project implementation as well as ongoing operation
• Risks perceived and mitigation measures (E.g. issue of political and Government staff acceptability, statutory consents- whether risks are justified by the potentially high outcomes)
• The way forward:
– Whether the decision is adequate to ensure continuation of services including availability of O&M budgets in case e-service charges are not available or are not adequate to cover these expenses
– The approval process would be detailed to ensure that this is the only approval that the implementing Entity requires.
A Fund Allocation prioritization framework is provided in the figure below
PricewaterhouseCoopers Page 257Confidential
D
Development of e-Government Strategy and Implementation Plan
Figure 34: Fund allocation prioritization
PricewaterhouseCoopers Page 258Confidential
D
Development of e-Government Strategy and Implementation Plan
PricewaterhouseCoopers Page 259Confidential
ANNEXURES
Development of e-Government Strategy and Implementation PlanInception Report
Annexures
Annexure I: Concept of Service Life Cycle
The concept of Life Cycle Event, service enablement and agency services, i.e. ‘transaction’, is explained in the following table:
Table 54: Lifecycle Event Description
Category Definition Example
Life Cycle Event
An event comprises the major categories through which any customer carries out his activities and interactions with the Government. These events are a combination of Life Cycle functions and service based
Birth of a child
Starting a business
Service Enablement
Refers to provisioning of a complete service offering; it comprises of many transactions.
Registering of business
Obtaining driver license
Agency Services ‘transaction’
Refers to individual transactions provided by multiple agencies/ departments within an agency for service enablement
Ministry of Trade and Industry– Business License
Ministry of Health – Drug Registration Certificate
The desired end result of enabling services for delivery via alternate channels is to facilitate the customers to access the services in an easier and faster manner. Life cycle based representation of services is a powerful tool towards this end. As per this concept, all services for a particular event say ‘starting a business’ should be available under a single umbrella and the customer should not be required to have multiple touch points for the same.
In addition to classifying and prioritizing services, services must be integrated at the back-end based on customer lifecycle approach. The services can be grouped by their customer base, and these can further be mapped onto the various customer lifecycle events, where they each respond to a particular need of the customer at a given time. Hence existing services can be identified based on life-cycle services approach for the various customer groups— citizens/residents, businesses, visitors and government employees.
The figures below provides an illustration for the life-cycle of events for the citizens/residents, business, visitors and government employees.
PricewaterhouseCoopers Page 260Confidential
Development of e-Government Strategy and Implementation PlanInception Report
PricewaterhouseCoopers Page 261Confidential
Development of e-Government Strategy and Implementation PlanInception Report
Figure 35: Life-Cycle Services
PricewaterhouseCoopers Page 262Confidential
Development of e-Government Strategy and Implementation PlanInception Report
Annexure II:
PMO Staffing Requirements
Considering the roles and responsibilities defined for various teams within PMO the table below proposes the profiles of
various members
and the
staffing strength for five years. The strength will be reviewed by the end of every year.
Table 55: PMO staffing Requirements
S. Team Title Numbers Key Roles and Knowledge
PricewaterhouseCoopers Page 263Confidential
Birth
Education
Old Age
Youth and Family
Employment
Death
Housing
Legal Services
Public Utilities
Grievance Redress
Travel
Others
Birth Certif icate; Immunization certif icate, others
Registration; Scholarship; Results; Certif icates
Work permit; employment benef its
Marriage; Divorce; Family Counseling
Social Assistance; Pension
Death Certif icate; Wealth Distribution
Building Permit; Sewerage; Electricity and Water, Permits
Debt Collection; Civil Suits
All Services and Agencies
Electricity; Water; Telephone
Passport; Student; Pilgrim; Scholarship
Informational Services; Fines; Registration
Citizen/ Resident
Key servicesLifecycle events
Exploration
Starting Business
Regulatory
Operations
Funding
Closure/ selling of business
Recruitment
Legal Services
Public Utilities
Expanding business
Grievance redress
Others
Economic data; business environment; regulations;
Registration; license; of f ice setup
options, loans
Approvals; Advertising; license; etc.
Returns; taxes; laws of land etc.
cancellation of license; etc.
Work permit; visa; etc.
Debt Collection; Civil Suits
Opening braches; adding activities
Electricity; Water; Telephone
All Services and Agencies
Real estate; environment; compliance
Business
Key servicesLifecycle events
Joining
Recurring
Resignation/ retirement
Career Advancement
Employee Welfare
Others
work permit; ID creation; personal details; training
Salary transfer; time and attendance; performance
appraisal
Training/ Promotion/Transfer)
Cancellation of work permit; pension; grant
Loans; further studies
Leave management; employee grievances
GovernmentEmployee
Key servicesLifecycle events
Recruitment Application; interview; offer
Travel within Ethiopia
Travel to Ethiopia
Tourism service providers
Others
Currency exchange; car rentals
Entertainment; food options, emergency contacts, local
customs
Licensing; online services provisioning
Leave management; employee grievances
Visitors
Key servicesLifecycle events
Enquiry Visa rules; travel agencies; destinations; weather; events;
accommodation, flight information
Exploration Information on Ethiopia; brochures
Development of e-Government Strategy and Implementation PlanInception Report
No.
Responsibilities
Areas (PMI)Y1
Y2
Y3
Y4
Y5
1. Project Co-ordination team (technology, process, application, Information Security)
Team Leader
1 1 1 1 1 • Monitoring the progress of various initiatives under e-Government Strategy with the help of team members.
• Managing the co-ordination between various Project Managers
• Project Integration Management
• Project Scope Management
• Project Time Management
Member (Technology)
1 1 1 1 1 • Monitoring the initiatives from technology perspectives.
Member (Process)
1 1 1 1 1 • Monitoring the initiatives from business process perspectives.
Member (Application)
1 1 1 1 1 • Monitoring the development of various applications and ensuring the coherence with framework defined under the application architecture
Member (Information Security)
1 1 1 1 1 • Monitoring the initiatives for Information
PricewaterhouseCoopers Page 264Confidential
Development of e-Government Strategy and Implementation PlanInception Report
Security compliance.
2. Knowledge Management Team
Team Leader
1 1 1 1 1 • Facilitate information exchange and knowledge sharing across entities and projects.
Project Communications Management
Member 1 1 1 1 1 • Manages databases of various initiatives being implemented under Strategy
• Ensure standards are shared with PMs.
• Use best practices in project management to update standards as needed
Member 1 1 1 1 1 • Confirm the compliance of RFPs with the procurement policies.
• Maintain a tracker for procurement activities and share the same with identified stakeholders
3. Appraisal Team (technical and financial)
Team Leader
1 1 1 1 1 • Review and approve the evaluation done by team for received requests and share the recommenda
• Project Scope Management
• Project Cost Manageme
PricewaterhouseCoopers Page 265Confidential
Development of e-Government Strategy and Implementation PlanInception Report
tions• Share
Detailed Project Report standard template with Entities and provide necessary awareness and support.
nt
Member Technical
1 1 1 1 1 • Evaluate the project request to verify applicability and compliance with technical requirements.
Member Financial
1 1 1 1 1 • Ensure sufficient financial details and breakdown is included in the request.
• Confirm availability of fund and identify sources and alternatives.
4. ITSG experts
Team Leader
1 1 1 1 1 • Identify a pool of resources to support with implementations across the Ministries/Agencies.
• Interact with various entities to maintain a demand tracker for various kinds
Project Human Resource Management
PricewaterhouseCoopers Page 266Confidential
Development of e-Government Strategy and Implementation PlanInception Report
of resources.• Identify
external providers for resources
Member 1 1 1 1 1 • Maintain a database of skilled resources and companies
• Respond to the demand of resources raised by Ministries/Agencies.
5. Marketing and Awareness
Team Leader
1 1 1 1 1 • Review the Marketing and Awareness Strategy
• Design and Implement Marketing and Awareness Campaigns
• Marketing and Public Relations
Team Member
2 2 2 2 2 • Design and Implement Marketing and Awareness Campaigns
• Design and Implement Marketing and Awareness Campaigns
6. Monitoring and Evaluation
Team Leader
1 1 1 1 1 • Monitoring the Project Progress
• Review the M&E Framework
• Conduct Evaluations
• M&E of large e-Government Projects
Team Members
2 2 2 2 2 • Monitoring the Project Progress
• Conduct Evaluations
• M&E of large e-Government Projects
7. Cadre Control
Team Leader
1 1 1 1 1 • Control Promotion, transfers
• Administrative and HR
PricewaterhouseCoopers Page 267Confidential
Development of e-Government Strategy and Implementation PlanInception Report
functions
Team Member
1 1 1 1 1 • Control Promotion, transfers
• Administrative and HR functions
PricewaterhouseCoopers Page 268Confidential
Development of e-Government Strategy and Implementation PlanInception Report
PMO Staffing Requirements – Background and Qualifications
Table 56: PMO Staffing Requirements
No.
Title Background and Qualifications
1. Team Leader (Project Coordination)
• Post graduate in Management with PMP certification.
• Minimum 8 years of experience in IT industry with 3 years in a Project Manager role
Member (Technology)
• Graduate in Computer Science or IT related field with technical certifications in infrastructure and computer hardware
• Minimum 6 years of experience in IT industry
Member (Process) • Post graduate in MIS, Management or related field.
• Minimum 4 years of experience in business processes
Member (Information Security)
• Graduate in Computer Science or IT related field with security certificates and/or technical infrastructure certifications. These can include CISSP, CISA, CISM, and other vendor specific certificates.
• Minimum 6 years of experience in IT and Information Security.
Member (Application)
• Graduate in Computer Science or IT related field with certifications in enterprise architecture and/or software development.
• Minimum 6 years of experience in IT industry
2. Team Leader (Knowledge Management)
• Graduate in MIS, Management or related field with certification in Project Management
• Minimum 8 years of experience in industry with 3 years as a KM team leader
Member (Knowledge Management)
• Graduate in MIS, Management or related field.
• Minimum 2 years of relevant experience
3. Team Leader (Appraisal)
• Post graduate in Management with certifications.• Minimum 8 years of experience in industry with 3
years in a Program Management Office of large implementation
Member (Technical)
• Post graduate in Management with certifications.• Minimum 4 years of experience in industry with 3
years in a Program Management Office of large implementation
Member (Financial) • Post graduate in Finance or qualified Chartered
PricewaterhouseCoopers Page 269Confidential
Development of e-Government Strategy and Implementation PlanInception Report
Accountant with certifications.• Minimum 4 years of experience in industry with 2
years in a Financial Analysis role.
4. Team Leader (ITSG Experts)
• Post graduate in Human Resources Management with certifications.
• Minimum 8 years of experience in industry with 3 years in leading recruitment division of a big IT organization.
Member • Graduate in Computer Science/IT with certifications.
• Minimum 2 years of experience in industry
Team Leader (MIS ) • Post graduate in MIS, Management or related field.• Minimum 8 years of experience in industry with 5
years in a similar position
5 Team Leader (Cadre Control)
• Post graduate in Human Resources Management with certifications.
• Minimum 8 years of experience in industry with 3 years in leading HR division of a big IT organization.
Member • Graduate in HR.• Minimum 2 years of experience in industry
6. Team Leader (Marketing and Awareness)
• Post graduate in Marketing and Public Relations• Minimum 8 years of experience in industry with 5
years in leading Marketing division of a big IT organization.
Member • Post Graduate in Marketing• Minimum 2 years of experience in Marketing in
industry
Team Leader (Marketing and Awareness)
• Post graduate in IT/MIS with relevant certification• Minimum 8 years of experience in industry with 3
years in handling large e-Governance Project as M&E Expert
Member • Minimum 3 years of experience in e-Governance
Annexure III: Training Courses and Course Levels
Table 57: Training Courses and Course Levels
Training Areas Available course curriculum
PricewaterhouseCoopers Page 270Confidential
Development of e-Government Strategy and Implementation PlanInception Report
Basic Competent Advanced
Technology Management Training
1 Basic Computer Training
2 Network Design and Management √ √
3 Web-Designing and Management √ √
4 Setup and Management √ √
5 Hardware/ Server Sizing and Management √
6 BCP/ DR √
7 Configuration Management √
8 Quality Management √ √
9 SDLC √ √
10
Database and Storage Administration √
11
Information Security √
12
Emerging ICT Technologies √ √ √
13
Open Standards/ Interoperability √ √ √
14
Monitoring √
15
Knowledge Management √ √
16
IT Standards, Guidelines and Procedures √ √ √
17
Application Development (Languages: VB, C, C++, Java, etc.)
√ √ √
18
Specialized Packages (e.g. AutoCAD, Tally, etc.)
√
Project Management Training Basic Competent
Advanced
1 IT Project Management √
PricewaterhouseCoopers Page 271Confidential
Development of e-Government Strategy and Implementation PlanInception Report
2 Program Management √
3 Outsourcing Management √ √
4 Vendor Management √
5 General Management √ √ √
6 Strategic Management √ √ √
7 IT Project Evaluation/ Audit √ √
Change Management
1 Managing Change Basics √
2 Human Resource Management √ √
3 Leadership Skills √ √ √
4 Intellectual Property Rights √
5 IT Acts, Policies and Regulations √
6 Application end-user Training √ √ √
7 Government Process Re-engineering √ √
8 Risk Analysis √
9 Champions Training Program √
10 Legal Reforms √ √
11 Business Process designing & detailing; BPM
√ √ √
Training Areas Include in which syllabus
Basic Competent
Advanced
Financial Management
1 Defining and Understanding Total Cost of Ownership (TCO)
√
2 Negotiation and Conflict Resolution Skills √
3 Procurement Process (especially licensing cost)
√ √
4 Financial Management √ √
5 PPP Modeling √ √
Soft Skills
PricewaterhouseCoopers Page 272Confidential
Development of e-Government Strategy and Implementation PlanInception Report
1 Communication and Presentation Skills √ √
2 Relationship Management √ √ √
3 Team Building √ √ √
4 Technical Report Writing Skills √ √
5 Personal effectiveness Skills √ √
6 Publicity and Awareness/ PR Skills √ √
PricewaterhouseCoopers Page 273Confidential
Development of e-Government Strategy and Implementation PlanInception Report
Annexure IV: Detailed Marketing and Awareness Strategy
Design of the marketing and awareness campaign will include five key components, each of which should be defined and described in as much detail as possible during the planning and design stage:
Identifying target market segments
Channel (media mix) selection
Timing
Message development
Audience skills and education
Target market segments
One marketing medium cannot reach all segments of the diverse community that makes up the Country of Ethiopia. Marketing campaigns do best when they define specific target markets and deliver a tailored marketing programme for each market.
Our prior experience with e-Government awareness campaigns indicates that billboards and traditional media – such as television and radio – alone will not be sufficient to penetrate the target market with news of the e-Government services. We also recommend presentations at schools, community organizations and events to supplement billboards and traditional advertising. Additionally we could also look at the mosques for distribution of flyers and leaflets. These marketing outlets will provide an opportunity for the Country to tailor specific messages to individual communities.
One way of segmenting the potential users for e-Government services is into four groups as illustrated in Table 21 below.
Table 58: Target Market Segments
Audience categories Segmentation basis
Business Size of business
Industry
Citizens and residents
Further segmentation based on
Education levels
Age
o Elderly
o Younger generation
Income groups
People with special needs
Socially underprivileged
Visitors Business travellers
Tourists
Government For all personnel (awareness of the overall
PricewaterhouseCoopers Page 274Confidential
Development of e-Government Strategy and Implementation PlanInception Report
employees eGovernment strategy)
Agency personnel (agency’s eGovernment programme)
At a finer level of granularity, within the residential segment there are several specific segments of the Country’s population that are traditionally harder to reach:
Elderly Uneducated Socially underprivileged People with special needs
Within the business community, there may be particular groups that will require special targeting. For example, if the Country launches a web application that enables applications for scholarships to be submitted online, it may be necessary to market this service to the students and their parents.
In the case of both specific residential and business segments, the Country should consider using specially targeted media. For example, a greater use of personal communications channels, such as outreach through community organizations, working with opinion leaders, and developing word-of-mouth, may be more appropriate to reach the elderly and non-Ethiopian communities. In contrast, methods such as direct mail may be the best way to get messages across to segments of the business community.
Communication and media channel mix
An appropriate communication and media channel mix is critical to ensure that everyone in the target audience receives and understands the campaign messages. Given customer diversity, any awareness-raising campaign that relies too heavily on just one medium or type of communication is unlikely to achieve its goals. However, there could be services which might be targeted at only a small segment of the society which would require targeted campaign through the channels and media of the choice of that segment. E.g. Pensions is one service that will only be targeted at the people in the old age, so the campaign will have to be directed through the medium which is most appealing to the old age segment. Suggested channels for different segments are illustrated in the table below.
Table 59: Effectiveness of Media Channels by Marketing Segments
New
spap
ers
T V
Bil
lboard
s
Dir
ect
ers
Ag
en
cy
Off
ices
Mall
s
Bu
ses
/ S
helt
ers
Tele
ph
on
e B
ooks
Bu
sin
ess
P
ubli
cati
on
sC
ham
bers
of
Com
merc
eM
osq
ues
Sch
ools
Lib
rari
es
Hosp
itals
Eve
nts
Work
shop
s
PricewaterhouseCoopers Page 275Confidential
Development of e-Government Strategy and Implementation PlanInception Report
Cit
izen
s an
d
E
lderl
y
You
ng
er
Gen
era
ti
Ara
bic
S
peakin
Un
-ed
uca
te
Bu
sin
es
s
Gove
rnm
en
t
PricewaterhouseCoopers Page 276Confidential
Development of e-Government Strategy and Implementation PlanInception Report
Annexure V: Detailed Project Report - Template
Some of the important Areas to be included in Detailed Project Report are as follows
1. Background of initiative and other basic information
2. Initiative overview or summary
Overview Input and output costing source of funding
3. Initiative details including implementation model
Goal and objectives of initiative Stakeholder analysis Service and service levels Implementation strategy Key activities (‘As Is Study’, ‘Process Re-engineering’, ‘Change Management’ etc.) Infrastructure requirements including technology Sustainability Plan
4. Way forward
5. Plan for implementation
A Sample Detailed Template for preparation of a DPR is given below
TABLE OF CONTENTS
1 EXECUTIVE SUMMARY
2 INTRODUCTION
2.1 ABOUT MINISTRY IMPLEMENTING THE PROJECT
2.2 IT INITIATIVES, PLANS OF MINISTRY
2.3 About Project
3 PROJECT OBJECTIVES
3.1 E-GOVERNMENT STRATEGY INITIATIVE OF GOVERNMENT
3.2 PROJECT OBJECTIVES
3.3 SCOPE OF WORK
4 SERVICES ENVISAGED – PRESENT AND FUTURE
5 SERVICES CURRENTLY OFFERED AND AS - IS IT SCENARIO
5.1 PRESENT IT SCENARIO IN MINISTRY
5.2 SERVICES CURRENTLY OFFERED
6 TARGET BENEFICIARIES
7 STAKEHOLDERS - ROLES AND RESPONSIBILITIES
PricewaterhouseCoopers Page 277Confidential
Development of e-Government Strategy and Implementation PlanInception Report
8 STAKEHOLDERS’ EXPECTATION
8.1 CITIZEN
8.2 ADMINISTRATION
8.3 FEDERAL GOVERNMENT
9 BUSINESS MODEL
10 BUSINESS PROCESS RE-ENGINEERING
10.1 REQUIREMENT FOR BPR
10.2 BPR METHODOLOGY
11 SERVICE LEVELS AND MEASUREMENT
12 CAPITAL EXPENDITURE
13 OPERATING EXPENSES
14 CAPACITY BUILDING, TRAINING REQUIREMENTS
15 CONTRACTING ARRANGEMENTS
16 RISK MANAGEMENT
17 KEY SUCCESS FACTORS
18 SERVICE DELIVERY MECHANISM
19 IMPLEMENTATION METHODOLOGY & STRATEGY
20 PROJECT MANAGEMENT AND MONITORING
20.1 PROJECT MANAGEMENT METHODOLOGY
20.2 PROJECT MANAGEMENT AND MONITORING STRUCTURE
21 MILESTONES & ESTIMATED PROJECT TIME SCHEDULE
PricewaterhouseCoopers Page 278Confidential
Development of e-Government Strategy and Implementation PlanInception Report
Annexure VI: Services Prioritization Framework
The implementation of the e-Services has been phased out as part of the phasing out of the sub-projects under the various Agency Priority Projects. However, during the implementation phase, there may be unforeseen exigencies that may warrant a further prioritization and phasing of the services planned during a given year. In order to address the same, a services prioritization framework has been designed so that the Government of Ethiopia can leverage the same to conduct this prioritization and phasing in a scientific manner.
The list of services to be electronically enabled should be prioritized using the criticality-feasibility model. This model facilitates the prioritization and phasing of services and initiatives based on their importance (criticality) and the ease of implementing them through electronic channels (feasibility).
Criticality should be evaluated though an assessment of:
Strategic Fit – Does this service fit into Ethiopian e-Government strategy?
Visibility – Will creating this service promote a positive image of Government of Ethiopia to constituents and businesses?
Cost Savings -- Does providing this service over the alternate channels generate cost savings for Ethiopia?
Revenue generation – Could electronically-enabling this service potentially provide a new revenue source for the Government?
To determine feasibility, following would be assessed:
Market Readiness – What is the number of customers that use the service? Are customers demanding this service?
Operational Readiness – Are the ministries and agencies ready from a technology and capability standpoint, to undertake this project?
Development Cost - Are development costs relatively low or high?
Leveragability – Can the service leverage an existing application? If a new application must be built, will other applications be able to leverage it?
The criticality and feasibility framework will allow the Government of Ethiopia to determine the phasing and prioritization of the initiatives in the following manner
Defer – If there is low criticality and low feasibility, the application should not be undertaken. Low criticality implies little gain and low feasibility implies relatively high risk. So such services should be taken up in the end.
Permit – If there is low criticality but high feasibility Government of Ethiopia should allow the development of the application as long as it follows the Standards and
PricewaterhouseCoopers Page 279Confidential
Development of e-Government Strategy and Implementation PlanInception Report
Guidelines and uses the overall infrastructure. Low criticality implies little gain, but high feasibility implies relatively few risks. This type of project should be allowed.
Pursue – If there is high criticality but low feasibility, Government of Ethiopia should allow the application to be built. High criticality implies that there is customer demand for such a service or that significant benefits could be realized from this application, but low feasibility implies that there may be significant risks.
Target – If there is high criticality and high feasibility, Ethiopia should build this application. High criticality implies customer demand and benefits to the organization and high feasibility implies relatively few risks in pursuing this application. Such services should be taken up at the earliest as they would provide maximum gains with
least amount of effort.
PricewaterhouseCoopers Page 280Confidential
Pursue Target
Defer Permit
High Criticality
Low Criticality
Hig
h F
easi
bili
ty
Low
Fea
sib
ility
Pursue Target
Defer Permit
High Criticality
Low Criticality
Hig
h F
easi
bili
ty
Low
Fea
sib
ility
Development of e-Government Strategy and Implementation PlanInception Report
Annexure VII: ICT Standing of Ethiopia – Some international Rankings
UN e-Readiness Index
Ethiopia has consistently been ranked around 170 marks on the UN e-Readiness Index in the past few years as shown in the table below.
Year Ranking
2005 171
2008 172
2010 172
The UN e-readiness Index is evaluated based on the Web maturity, Infrastructure and Human Capital available in the country. Ethiopia has made significant progress in the web measure index over the years but the Infrastructure component of the index has been relatively low as seen in the Chart below.
e-readiness Index Web measure index
Infratrucure Index Human Capital Index
0
0.05
0.1
0.15
0.2
0.25
0.3
0.35
0.4
0.45
2005
2008
2010
Ethiopia must target to break into the 150 mark on the countries ranking by the next UN Rankings by targeting a Web Measure Index of 0.3, Infrastructure Index of 0.05 and Human Capital index of 0.39.
PricewaterhouseCoopers Page 281Confidential
Development of e-Government Strategy and Implementation PlanInception Report
PricewaterhouseCoopers Page 282Confidential
Development of e-Government Strategy and Implementation PlanInception Report
The Web Measure Index
The Web Measure Index is based upon a five-stage model, which builds upon the previous levels of sophistication of a country’s online presence. As a country migrates upwards through the various stages, it is ranked higher in the web measure index.
Figure - Stages of UN Web Measurement Index
The Telecommunication Infrastructure Index
The Telecommunication Infrastructure Index is a composite index of five primary indicators relating to a country’s infrastructure capacity as they relate to the delivery of eGovernment services. These are:
1. Internet Users /100 persons2. PCs /100 persons3. Main Telephones Lines /100 persons4. Cellular telephones /100 persons5. Broad banding /100 persons
The Human Capital Index
The Human Capital Index is a composite index of the adult literacy rate and the gross enrolment ratio (including primary, secondary and tertiary enrollment), with two thirds weight given to the adult literacy rate and one third to the gross enrolment ratio.
PricewaterhouseCoopers Page 283Confidential
Connected
Transactional
Interactive
Enhanced
Emerging Current State of Ethiopia
Development of e-Government Strategy and Implementation PlanInception Report
ICT DEVELOPMENT INDEXES - 2008 RANKING:
International Telecommunication Union (ITU) places Ethiopia 154th in Global IT Development Index. The best and the worst performing countries in ICT Development as per ITU are illustrated below
Economy Rank 2008
IDI 2008 Rank 2007
IDI 2007
Sweden 1 7.85
1 7.27
Singapore 14 6.95
15 6.47
United States
19 6.54
17 6.33
India 117
1.75
116
1.62
Tanzania 149
1.17
151
1.05
Ethiopia 154
1.03
153
0.97
Niger 158
0.9 157
0.86
Chad 15 0.7 15 0.7
PricewaterhouseCoopers Page 284Confidential
Development of e-Government Strategy and Implementation PlanInception Report
9 9 9 3
The following section illustrates the three major Methodologies to assess the ICT status of Ethiopia.
I. ICT Opportunity Index
II. ICT Development Index
III. ICT Price basket
I. ICT Opportunity Index:
In this method, the evaluation is broadly categorized into Information density and Information Usage. Information Density comprises of the ICT Networks which is further broken down into sub index of Fixed Telephone lines, Internet Bandwidth and Mobile subscriptions and ICT Skills which is a basic requirement for accessing and comprehending the Information. The ICT Skills basically comprises of the literacy indicators and School enrolment indicators. Information Usage is further broken down into ICT Usage intensity comprising of Broadband subscription and International outgoing telephone traffic and the ICT Usage uptake comprising of PC, TV and Internet usage as illustrated in the diagram below.
PricewaterhouseCoopers Page 285Confidential
Development of e-Government Strategy and Implementation PlanInception Report
Ethiopia - ICT Opportunity Index Analysis:
inde
x
104.
7
8.7
26.2
103.
6
229.
6
South Africa
Ethiopia LOW AV-ERAGE
(63 economies)
MEDIUM AVERAGE
(63 economies)
UPPER AVERAGE
(28 economies)
0
50
100
150
200
250
SKILLS
UPTAKE
INTENSITY
ICT-OI
Avg annual growth rate 2001-05
As seen in the above graph, Ethiopia is much below the Low Average in the ICT Skill Levels. The ICT Uptake which is the usage of PC, TV and Internet is strikingly lower than the Low Average of 63 Countries. The ICT Intensity which is mainly driven by the telephone traffic is relatively better at the same level as the Low average of countries.
II. ICT Development Index
PricewaterhouseCoopers Page 286Confidential
Development of e-Government Strategy and Implementation PlanInception Report
The ICT Development Index method mainly helps to assess the ICT Impact and Outcomes by evaluating the ICT Access, ICT Usage and ICT Capability of the country. Following is the ICT Index status of Ethiopia benchmarked against Average values for Indicators.
ICT INDEX 2008 Average Value Ethiopian Values
Ethiopian Rank (out of 159 Countries)
ICT Development Index
3.58 1.03 154
Access 4.07 1.33 148
Usage 1.7 0.01 157
Skills 6.37 2.43 153
PricewaterhouseCoopers Page 287Confidential
Development of e-Government Strategy and Implementation PlanInception Report
Parameters for ICT Development Index:
Following is the description of key parameters used in deducing the ICT Development Index. Ethiopia which is ranked 154th in this Index needs to focus and improve these parameters in order to go up the ranking table.
A. Access sub-index:
This index captures ICT readiness and includes five infrastructure and access indicators
fixed telephony,
mobile telephony,
international
Internet bandwidth,
households with computers,
households with Internet
B. Use sub-index:
This index captures ICT intensity and includes three ICT intensity and usage indicators
Internet users,
fixed broadband,
mobile broadband
C. Skills sub-index:
This index captures ICT capability or skills as indispensable input indicators and includes three proxy indicators
adult literacy,
gross secondary and tertiary enrolment
The skills sub-index therefore has less weight in the computation of the IDI compared to the other two sub-indices.
ICT Development Index: Benchmarking with Average values
Ethiopian ICT Development has a huge gap to bridge in order to reach the minimum average global standards of ICT as indicated in the graph below:
PricewaterhouseCoopers Page 288Confidential
Development of e-Government Strategy and Implementation PlanInception Report
ICT De-velopment
Index
Access Usage Skills0
1
2
3
4
5
6
7
Average Value
Ethiopian Values
III. ICT Price Basket Analysis:
The third approach of ICT Assessment is the ICT Price Basket Analysis where the affordability and pricing of the ICT services is benchmarked against global standards as
indicated in the picture below.
Ethiopia - ICT Price Basket Ranking and key statistics:
Ethiopia is ranked at 140th position out of 161 countries evaluated for ICT Price basket as indicated in the following table. When compared to a developing country like India, Ethiopia fares similar to India in Fixed Telephone rates and 6.5 times higher rate than in India for Cellular rates. But the major obstacle to the Ethiopian ICT Development is the broadband rate which is 360 times higher than that in India and 3600 times higher than that in Singapore.
PricewaterhouseCoopers Page 289Confidential
Development of e-Government Strategy and Implementation PlanInception Report
Details Ethiopia
India
Singapore
Rank Economy(out of 161 Countries)
140 81 3
ICT Price Basket 37.98 3.64 0.33
Fixed telephone sub-basket as a % of GNI per capita(2009)
3.76 3.5 0.27
Mobile cellular sub-basket as a % of GNI per capita(2009)
10.19 1.57 0.14
Fixed broadband sub-basket as a % of GNI per capita(2009)
2085.05 5.84 0.58
GNI per capita, US$, 2008
280 1'070
34'760
ICT Price Basket
Fixed telephone sub-basket as a % of GNI per capita(2009)
Mobile cellular sub-basket as a % of GNI per capita(2009)
Fixed broadband sub-basket as a % of GNI per capita(2009)
37.98
3.76
10.19
2085.05
3.64
3.5
1.57
5.84
0.330000000000005
0.27
0.14
0.58
ICT Price Basket Analysis
Singapore India Ethiopia
AFRICAN ICT STATISTICS:
Even amongst the African countries, Ethiopian ICT status falls much below the rest of the countries as illustrated in the following table and graphs.
Country
Fixed telepho
Mobile cellular
International Internet
Proportion of
Proportion of
PricewaterhouseCoopers Page 290Confidential
Development of e-Government Strategy and Implementation PlanInception Report
ne lines per 100 inhabita
nts
subscriptions
per 100 inhabitants
bandwidth per Internet user(bit/s)
householdswith
computer
households
with Internet
Ethiopia
1.1
1.5 842 0.2 0.1
Kenya 0.7
30.2 112 5.5 2.2
Sudan 0.9
21.3 3800 4.3 1
Egypt 14.9
39.8 1023 16.1 9.1
Nigeria 1.1
27.3 69 5.1 3.6
South Africa
9.6
87.1 852 14.8 4.8
PricewaterhouseCoopers Page 291Confidential
Ethio
pia
Kenya
Suda
nEgy
pt
Nigeri
a
Sout
h Afri
ca0
20
40
60
80
100
Mobile cellular subscriptions per 100 inhabitants
Mobile cellular subscrip-tions per 100 inhabitants
Development of e-Government Strategy and Implementation PlanInception Report
Ethio
pia
Kenya
Suda
nEgy
pt
Nigeri
a
Sout
h Afri
ca0
2
4
6
8
10
Proportion of households with Internet
Proportion of households with Internet
Source: ITU World Telecommunication/ICT Indicators Database
PricewaterhouseCoopers Page 292Confidential
Development of e-Government Strategy and Implementation PlanInception Report
Annexure VIII: Risk in E-Government Strategy Implementation
Implementation of such a large program such as the National E-Government Strategy will naturally involve many risks and it is important to identify and plan for the management of the different kinds of risks which will arise in course of the Program Implementation.
The risks may be categorized broadly under two heads i.e. Program Level and Project Level
Program level Risks
These, among others will include Change in Government priorities or requirements due to unexpected circumstances Budgetary constraints Change in Leadership at top levels leading to disruption or modifications Issues in Governance structure in terms of lack of PMO or inadequate coordination
between stakeholders, etc
Project level Risks
At the project level, the risks would include Shortage of required human resources Lack of availability of required skill sets for implementation Poor project management processes and practices Inadequate detailed documentation whether DPR or RFP etc, which will lead to
delays and problems in implementation Inadequate capacity of selected vendors and vendor management issues
The above are a few of the envisaged risks while implementing a large program. It is hence important that the required Governance structure to oversee and monitor this kind of a program is created and standard practices and processes are followed.
It is important that a risk identification and management strategy is created at start of adoption of the strategy and is continuously tracked and updated. Project management, including risk management templates are provided in the following Annexure. Risk Management will one of the important activities of PMO
PricewaterhouseCoopers Page 293Confidential
Development of e-Government Strategy and Implementation PlanInception Report
Annexure IX: Sample Project Management templates
1. Minutes of meeting Format
{insert name of meeting} meeting agenda and minutes
Meeting Date:
Time:
Facilitator:
Recorder:
Location: Number of Pages:
Distribution and Attendee List: (X indicates that the member was present; T indicates present via teleconference, A - Absent)
***Visitors-
Agenda:
Item Category: A - action D - decision R - action rolled over C - completeN - note
Nbr.
Topic A/C/D/
N/R
Time Frame
Start Time
Responsible
1.
2.
3.
4.
PricewaterhouseCoopers Page 294Confidential
Development of e-Government Strategy and Implementation PlanInception Report
PricewaterhouseCoopers Page 295Confidential
Development of e-Government Strategy and Implementation PlanInception Report
Annotated Agenda & Minutes:
Topic 1
Discussion:
Topic 2
Discussion:
Topic 2 Team
Discussion:
Future Meeting Schedule
Date Time Location Facilitator/Scribe
Future Agenda Item(s)
Agenda Item Planned Date(s)
Priority
Time
Responsible
PricewaterhouseCoopers Page 296Confidential
Development of e-Government Strategy and Implementation PlanInception Report
Action Items
Open Action Items
# Create Date
Action Item Assigned Target Date
1
2
3
4
6
Closed Action Items
# Create Date
Action Item Assigned Target Date
1
Issues Opened
# Open Date
Issue Description
Assigned Target Date
Category
(1/2/3)
Priority
(H/M/L)
Risks Opened
# Open
Date
Title Assigned to
Target
Date
Category
(1/2/3)
Impact
(1/2/3/4/5)
Probability
(0-100%)
Cost
PricewaterhouseCoopers Page 297Confidential
Development of e-Government Strategy and Implementation PlanInception Report
2. Project Charter Template
VERSION: [VERSION NUMBER]
Pre-Requisites for this Document None
Review and Approval of the Project Charter indicates an understanding of the purpose and content described in this document. By signing this deliverable, each individual agrees work should be initiated on this project and necessary resources should be committed as described herein.
Title Name Signature Date
Owner Ministry/AgencyPMO Head
PMO Programme ManagerPMO Finance
Revision
Any revision of content in this document needs approval as per the below table. Review and Approval of the Project Charter indicates an understanding of the purpose and content described in this document. By signing this deliverable, each individual agrees work should be initiated on this project and necessary resources should be committed as described herein
Revision SNo.
1 Revision Date
Title Name Signature DateOwner Ministry/AgencyPMO Head
PMO Programme ManagerPMO Finance
Revision SNo.
2 Revision Date
Title Name Signature DateOwner Ministry/Age
PricewaterhouseCoopers Page 298Confidential
Development of e-Government Strategy and Implementation PlanInception Report
ncyPMO Head
PMO Programme ManagerPMO Finance
Contents
Section 1. Project Overview1.1 Problem Statement1.2 Project Goals and Objectives1.3 Project Scope1.4 Assumptions1.5 Constraints1.6 Risks
Section 2. Project Authority and Milestones2.1 Funding Authority2.2 Project Oversight Authority2.3 Major Project Milestones
Section 3. Project Organization3.1 Project Structure 43.2 Roles and Responsibilities
Section 4. Points of Contact………………………………………………………………………………………………………………………
Section 1. Project Overview
1.1 Problem StatementDescribe the business reason(s) for initiating the project, specifically stating the business problem.Problem Statement
1.2 Project Goals and ObjectivesDescribe the business goals and objectives of the project.Sno Problem Goals and Objectives
1.3 Project ScopeDescribe the project scope. The scope defines project limits and identifies the products and/or services delivered by the project. The scope establishes the boundaries of the project and should describe products and/or services that are outside of the project scope.
Sno Project Includes
PricewaterhouseCoopers Page 299Confidential
Development of e-Government Strategy and Implementation PlanInception Report
Sno Project Excludes
1.4 AssumptionsDescribe any project assumptions related to business, technology, resources, scope, expectations, or schedules.Sno Assumptions
1.5 ConstraintsDescribe any project constraints being imposed in areas such as schedule, budget, resources, products to be reused, technology to be employed, products to be acquired, and interfaces to other products. List the project constraints based on the current knowledge today.Sno Constraints
1.6 RisksDescribe any events or conditions that may occur, and whose occurrence, if it does take place, has a harmful or negative effect in your projectSno Risks
Section 2. Project Authority and Milestones2.1 Funding AuthorityFunding AuthorityEstimated Budget –ETB/USD
2.2 Project Oversight AuthorityDescribe management control over the project. Mention any external oversight bodies, Programme Management office, etcOversight AuthorityOwner Directorate
2.3 Major Project MilestonesList the expected duration of the project and its major milestones and deliverables and the planned completion dates for delivery. This list should reflect products and/or services
PricewaterhouseCoopers Page 300Confidential
Development of e-Government Strategy and Implementation PlanInception Report
delivered to the end user as well as the delivery of key project management or other project-related work products. Expected Total Duration of projectMilestone/Deliverable Planned
Completion Date
PricewaterhouseCoopers Page 301Confidential
Development of e-Government Strategy and Implementation PlanInception Report
Section 3. Project Organization
3.1 Project StructureAssign a Project Manager and describe the initial organizational structure of the project team and stakeholders, preferably providing a graphical depiction.Project Manager
Initial Project Organization Structure
3.2 Roles and ResponsibilitiesSummarize roles and responsibilities for the project team and stakeholders identified in the project structure above.
Role Responsibility
Section 4. Points of Contact
Identify and provide contact information for the primary and secondary contacts for the project.Primary Contact Name/Title/Organization Phone Email
Secondary Contact Name/Title/Organization Phone Email
PricewaterhouseCoopers Page 302Confidential
Development of e-Government Strategy and Implementation PlanInception Report
3. Project Closure TemplatePROJECT CLOSURE REPORT
[PROJECT NAME]
VERSION: [VERSION NUMBER]
Pre-Requisites for this Document None
Title Name Signature DateProject ManagerOwner Ministry/AgencyProgramme managerPMO Head
PricewaterhouseCoopers Page 303Confidential
Development of e-Government Strategy and Implementation PlanInception Report
Prepared By
Document Owner(s) Project/Organization Role
Project Closure Report Version Control
Version
Date Author Change Description
TABLE OF CONTENTSPROJECT CLOSURE REPORT[PROJECT NAME]1 PROJECT CLOSURE REPORT PURPOSE2 PROJECT CLOSURE REPORT GOALS3 PROJECT CLOSURE REPORT SUMMARY3.1 Project Background Overview3.2 Project Highlights and Best Practices3.3 Project Closure Synopsis4 PROJECT METRICS PERFORMANCE4.1 Goals and Objectives Performance4.2 Success Criteria Performance4.3 Milestone and Deliverables Performance4.4 Schedule Performance4.5 Budget Performance4.6 Metrics Performance Recommendations5 PROJECT CLOSURE TASKS5.1 Knowledge Management5.2 Issue Management5.3 Risk Management5.4 Quality Management5.5 Communication Management5.6 Asset Management5.7 Lessons Learned5.8 Post project Tasks5.9 Project Closure Recommendations
PricewaterhouseCoopers Page 304Confidential
Development of e-Government Strategy and Implementation PlanInception Report
PROJECT CLOSURE REPORT PURPOSE
Project Closure Report Purpose
The Project Closure Report is the final document produced for the project and is used by senior management to assess the success of the project, identify best practices for future projects, resolve all open issues, and formally close the project.
PROJECT CLOSURE REPORT GOALS
Project Closure Report Goals
[Replace this text with your own statement of goals, or use the following sample.]
This Project Closure Report is created to accomplish the following goals:
Review and validate the milestones and success of the project. Confirm outstanding issues, risks, and recommendations. Outline tasks and activities required to close the project. Identify project highlights and best practices for future projects.
PROJECT CLOSURE REPORT SUMMARYProject Background Overview
Project Background Overview
[Replace this text with a brief description of the project background.
What were the original goals, objectives, and success criteria? Refer to project overview statement and/or project charter for
this information.]
PricewaterhouseCoopers Page 305Confidential
Development of e-Government Strategy and Implementation PlanInception Report
Project Highlights and Best Practices
Project Highlights and Best Practices
Project Highlights:
[Highlight] [Highlight]
Best Practices:
[Best practice] [Best practice]
Project Closure Synopsis
Project Closure Synopsis
[Replace this text with a brief description of why the project is being closed.
Is it being closed because all project objectives and deliverables have been met?
Or is it being closed for other reasons (loss of funding, shift in strategy, etc.)?]
PricewaterhouseCoopers Page 306Confidential
Development of e-Government Strategy and Implementation PlanInception Report
PROJECT METRICS PERFORMANCEGoals and Objectives Performance
Goals and Objectives Performance
[Replace this text with a comparison of actual project performance to project objectives.]
Success Criteria Performance
Success Criteria Performance
[Replace this text with details of project performance in terms of targeted success criteria.
Were all criteria achieved? To what level of success? If some criteria were not achieved, what were the reasons?
Is achievement anticipated at a later date? Who is responsible for measuring continued progress?]
Milestone and Deliverables Performance
Milestones and Deliverables Performance
[Replace this text with an outline of actual performance of project milestones and corresponding deliverables.
Were all deliverables achieved with high quality and customer acceptance?
If not, what were the reasons? Is achievement anticipated at a later date?]
Schedule Performance
Schedule Performance
Project Schedule Overview:[Replace this text with the overview.]
Project Schedule Corrective Actions:[Replace this text with the corrective actions.]
Budget Performance
Budget Performance
Project Budget Overview:[Replace this text with the overview.]
Project Budget Corrective Actions:[Replace this text with the corrective actions.]
Metrics Performance Recommendations
PricewaterhouseCoopers Page 307Confidential
Development of e-Government Strategy and Implementation PlanInception Report
Metrics Performance Recommendations
[Replace this text with an outline of metrics performance recommendations for the future.]
PROJECT CLOSURE TASKSKnowledge Management
Knowledge Management
[Replace this text with an explanation of how knowledge can be managed.
Explain how project knowledge (IP) from project team members will be captured and retained for future projects.]
Issue Management
Issue Management
[Replace this text with a list of any issues still outstanding at the end of the project.
Will each issue be resolved? Who will continue to report on each issue's progress?]
Risk Management
Risk Management
Project Risks Mitigated:[Replace this text with the risks mitigated.]
Outstanding Project Risks:[Replace this text with the outstanding risks.]
Quality Management
Quality Management
[Replace this text with a description of how quality management processes were used and integrated into the project, and how quality control measures provided quality assurance.]
Communication Management
Communication Management
PricewaterhouseCoopers Page 308Confidential
Development of e-Government Strategy and Implementation PlanInception Report
[Replace this text with an outline of the project communication process.
How effective was the process? What changes were made during the project?]
Asset Management
Asset Management
[Replace this text with a list of assets remaining at the end of the project.
How will those assets be dispositioned? Who will manage the disposition process?]
Lessons Learned
Lessons Learned
[Replace this text with a list of successes and shortcomings to remember for the future.
Which activities and processes worked well? Which could have been improved, and how?]
Post project Tasks
Post project Tasks
[Replace this text with a list of outstanding issues for this project.
What actions are not yet completed? Who is responsible for them?
Which success criteria are not yet met? Which deliverables are not yet achieved?
Which training requirements are still outstanding? This information can be summarized from details in the
preceding sections.]
Project Closure Recommendations
Project Closure Recommendations
[Replace this text with a list of recommendations arising from review of closure tasks.
The main recommendation would usually be to gain project closure approval from the Project Sponsor, including agreement that the project has fulfilled all of the requirements as documented and that the Project Sponsor is satisfied that all outstanding items have been satisfactorily addressed.]
PricewaterhouseCoopers Page 309Confidential
Development of e-Government Strategy and Implementation PlanInception Report
PricewaterhouseCoopers Page 310Confidential
Development of e-Government Strategy and Implementation PlanInception Report
4. Project Status Report Template
Project NameProject ManagerOwner Ministry/AgencyPMO Representative nameProject Start DateEstimated Date of Go-Live Modified?
(Mark “Modified” if there is any change in the date from last week.)
SNo. 1
Estimated Project End Date Modified? SNo. 1(Indicates the SNos of tasks that resulted in change of dates)
Project Status Meeting detailsDate & Place of MeetingMoM
Status of Planned activities
SNo.
Activity description Activity type
Status Remarks
Project Task / Action Task
Completed / In Progress / Delayed / Not Started
Targets for next week
SNo.
Activity description Activity type
Status Remarks
Project Task / Action Task
Completed / In Progress / Delayed / Not Started
PricewaterhouseCoopers Page 311Confidential
Development of e-Government Strategy and Implementation PlanInception Report
5. Project Snapshot Template
P R O G R A M S N A P S H O T
Q U A R T E R L Y O U T C O M E S
PQ TQ Change
eGovernment Program Start Date
Number of services online
PMO Creation Date Number of transactions through alt. channels
Expected Program End Date
Customer Satisfaction Index (CSI)Government Transformation Index (GTI)United NationseGovernment Readiness Ranking
GlobalAfrica
P R
O J
E C
T V
I E
W
Project Name Stage
Status
Priority End Date(Expected /
Actual)
Financial Progress
Services
online
Support Require
d
Responsible
DirectorateC-D-
IH-M-L Allocate
dActua
lY-N
C H
A N
N E
L V
I E
W
Channel Name Stage
Status
Date for Pilot
(Expected / Actual)
Date for roll-out
(Expected / Actual)
Financial Progress
Support Required
Responsible
Directorate
C-D-I
Allocated
Actual
Y-N
eGovernment PortalNational Call CentreCommon Service CentresMobile PortalKiosk
PricewaterhouseCoopers Page 312Confidential
Development of e-Government Strategy and Implementation PlanInception Report
E N
A B
L E
R
V I
E W
Enabler Name Status
Financial Progress
Deliverables Support Require
d
Responsible Directorate
Allocated
Actual
PQ TQ Y-N
Marketing and Awareness
eGovernment Awards
eGovernment Benchmarking
M&E - CSI Evaluation
M&E - GTI Evaluation
Standards and Policies
Customer Charter Framework
Government Process Reforms (GPR)
Capacity Building
PricewaterhouseCoopers Page 313Confidential
Development of e-Government Strategy and Implementation PlanInception Report
6. Risk Management Template
Project Name:Date: Release: Draft/FinalAuthor:
Owner:
Client:
Document Number:
Note: This document is only valid on the day it was printed
Revision HistoryDate of next revision:
Revision Date
Previous Revision Date
Summary of Changes Changes Marked
Approvals
This document requires the following approvals. A signed copy should be placed in the project files.
Name Signature Title Date of Issue
Version
Distribution
This document has been distributed to:Name Title Date of
IssueVersion
Overview
PricewaterhouseCoopers Page 314Confidential
Development of e-Government Strategy and Implementation PlanInception Report
Purpose A Risk Management Strategy describes the specific risk management techniques and standards to be applied and the responsibilities for achieving an effective risk management procedure.
Contents The Risk Management Strategy should cover the following topics.Introduction 286Risk Management Procedure 286Tools and Techniques 286Records 286Reporting 286Timing of Risk Management Activities 286Roles and Responsibilities 286Scales 287Proximity 287Risk Categories 287Risk Response Categories 287Early-warning Indicators 287Risk Tolerance 287Risk Budget 287
Advice The Risk Management Strategy is derived from the: Project Brief; Business Case; The corporate or programme management’s risk management guide, strategy or policy.A Risk Management Strategy can take a number of formats, including: Stand-alone document or a section in the Project Initiation Document; Entry in a project management tool.
The following quality criteria should be observed: Responsibilities are clear and understood by all parties The risk management procedure is clearly documented and
can be understood by all parties Scales, expected value and proximity definitions are clear and
unambiguous The chosen scales are appropriate for the level of control
required Risk reporting requirements are fully defined.
PricewaterhouseCoopers Page 315Confidential
Development of e-Government Strategy and Implementation PlanInception Report
Introduction
(States the purpose, objectives and scope, and identifies who is responsible for the strategy)
Risk Management Procedure
(A description of (or reference to) the risk management procedure to be used. Any variance from programme management standards should be highlighted, together with a justification for the variance.)
The procedure should cover activities such as:
Identify
Assess
Plan
Implement
Communicate
Tools and Techniques
(Refers to any risk management systems or tools to be used, and any preference for techniques which may be used for each step in the risk management procedure)
Records(Definition of the composition and format of the Risk Register and any other risk records to be used by the project)
Reporting(Describes any risk management reports that are to be produced, including their purpose, timing and recipients)
Timing of Risk Management Activities
PricewaterhouseCoopers Page 316Confidential
Development of e-Government Strategy and Implementation PlanInception Report
(States when formal risk management activities are to be undertaken - for example, at end stage assessments)
Roles and Responsibilities(Defines the roles and responsibilities for risk management activities)
Scales(Defines the scales for estimating probability and impact for the project to ensure that the scales for cost and time (for instance) are relevant to the cost and timeframe of the project. These may be shown giving the criteria for each level within the scale, e.g. for ‘very high’, ‘high’, ‘medium’, ‘low’ and ‘very low’)
Proximity
(Guidance on how proximity for risk events is to be assessed. Proximity reflects the fact that risks will occur at particular times and the severity of their impact will vary according to when they occur. Typical proximity categories will be: imminent, within the stage, within the project, beyond the project)
Risk Categories
(Definition of the risk categories to be used (if at all). These may be derived from a risk breakdown structure or prompt list. If no risks have been recorded against a category, this may suggest that the risk identification has not been as thorough as it should have been)
Risk Response Categories
(Definition of the risk response categories to be used, which themselves depend on whether a risk is a perceived threat or an opportunity)
Early-warning Indicators
(Definition of any indicators to be used to track critical aspects of the project so that if certain predefined levels are reached, corrective action will be triggered. They will be selected for their relevance to the project objectives)
Risk Tolerance
(Defining the threshold levels of risk exposure, which, when exceeded, require the risk to be escalated to the next level of management. (For example, a project-level risk tolerance could be set as any risk that, should it occur, would result in financial loss. Such risks would need to be escalated to corporate or programme management.) The risk tolerance
PricewaterhouseCoopers Page 317Confidential
Development of e-Government Strategy and Implementation PlanInception Report
should define the risk expectations of corporate or programme management and the Project Board)
Risk Budget
(Describing whether a risk budget is to be established and, if so, how it will be used)
Annexure X: List of Services
Projects Total Services
Informational Services
G2C
G2B
Total Services
Transactional Services
G2C
G2B
e-Agriculture
Provision of data on the Agro-processing Industry.
Yes Yes Agricultural Product Inspection and Certification Services for Investors or any Business man who is engaged in import and/or export of plant and animals products for commercial purpose
Yes
Crop Failure Reports
Yes Yes Application for python sanitary inspection on export and import.
Yes
Provision of information on Enabling Environment, Financing, and Infrastructure in the agro-processing industry.
Yes Application for the import or export pesticide for commercial purpose
Yes
Provision of Information on Market Fragmentation and Investment Potential.
Yes Yes Application for plant import permit,
Yes
Provision of Information on Quality Standard Implementation and Certification.
Yes Application form to obtain the land
Yes
Provision of Information
Yes Provision of Information on the
Yes
PricewaterhouseCoopers Page 318Confidential
Development of e-Government Strategy and Implementation PlanInception Report
Projects Total Services
Informational Services
G2C
G2B
Total Services
Transactional Services
G2C
G2B
on Competition Indicators in the Agricultural sector.
potential Agricultural land
Provision of Information on Investment Incentives in the Agro-processing Industry.
Yes Technical and Administration support
Yes
Information on prices of Fertilizers, Pesticides, Seeds, and Crops.
Yes Yes Continuous follow-up and support on the land use, Land management
Yes
Technical services and support for farmers.
Yes Yes Custom clearance certificate for agriculture imports
Yes
Information on livestock disease control & surveillance
Yes Yes Certificate of competence on agriculture
Yes
Information on animal infrastructure distribution & personnel
Yes Certificate of import & export of animal & crop products
Yes
Information on quarantine inspection and certification
Yes Irrigation Request by farmers.
Yes
Information on rural land admin. Policies, procedure & guidelines
Yes Yes Loan services for crops
Yes
Information on natural resources conservation
Yes Fertilizer Service/ purchase
Yes
Provision of information on import and export statistics by product value, quantities destination
Yes Yes
15 14
PricewaterhouseCoopers Page 319Confidential
Development of e-Government Strategy and Implementation PlanInception Report
Projects Total Services
Informational Services
G2C
G2B
Total Services
Transactional Services
G2C
G2B
Social Benefit
Management
Web-based information publishing
Yes Applications for availing benefits
Yes
Benefits eligibility calculator
Yes Pension Services (Pensioner registration, and pension payment)
Yes
Support Letter (for unemployment; free health treatment, scholarships)
Yes
2 3
e-Education
National Exam results
Yes Student registration Yes
Student placement results
Yes Certificate for completion of high school (original & replacement)
Yes
Teacher placement results
Yes Certificate for completion of degree (original & replacement)
Yes
Publish education statistics
Yes Yes National exam candidate registration
Yes
Report student performance results
Yes Teaching permit – for employment
Yes
Education certificate – to be sent abroad
Yes
Re-issuance of national exam certificates upon request
Yes
Scholarships Yes
5 8
e-Health Hospital Information
Yes Yes Issuance of Drug Marketing license
Yes
Drug pricing information
Yes Yes Issuance and renewal of Certificates of competence to drug establishments
Yes
Drug Availability Information
Yes Yes Issuance, Renewal and cancellation of drug registration certificate
Yes
Doctors profile information
Yes Issuance of certificate of competence to health professionals
Yes
Request of Yes Yes
PricewaterhouseCoopers Page 320Confidential
Development of e-Government Strategy and Implementation PlanInception Report
Projects Total Services
Informational Services
G2C
G2B
Total Services
Transactional Services
G2C
G2B
Medication/ medical supplies for citizensIssuance of licenses to hospitals
Yes
Request for Vaccination
Yes Yes
Issuance, Renewal and cancellation of license to conduct clinical trials
Yes
Booking of Appointments
Yes
4 10 Notification of Test results
Yes
e-Trade Provision of Investor Information
Yes Business Licensing and Registration services(Issuance, Renewal and cancellation) including professional, contractors and construction machines licensing
Yes
Policies on Business Loans
Yes Trade name and trade mark registration and renewal
Yes
Provision of Export/Import Trade Information to the business community
Yes Collection of fines if businesses operate without license or outdated license
Yes
Dissemination of market research to Exporters for investing in existing as well as new markets
Yes Requesting for Business area
Yes
Provision of Information on SMMEs and Large Industries
Yes Application for Subsidies and Duty relaxations
Yes
Encouraging businesses engaged in export trade to utilize he export trade incentive scheme of the country
Yes Issuing commercial representative license
Yes
Giving licenses to Yes
PricewaterhouseCoopers Page 321Confidential
Development of e-Government Strategy and Implementation PlanInception Report
Projects Total Services
Informational Services
G2C
G2B
Total Services
Transactional Services
G2C
G2B
forwarders and shipping agentsAmendment of business license
Yes
Registration of commercial representative
Yes
Issuance of broadcast license
Yes
Issuance of press licenses
Yes
Alteration and modification of principal registration
Yes
6 12
Employment
Management System
Information on employment opportunities within the government
Yes Unemployment Registration/ Unemployment Certificate
Yes
Labour Market Information
Yes
Overseas employment registration for Ethiopian Nationals
Yes
Job Matching Yes
Employment Agency License Renewal
Yes
Employment Agency Licensing (New)
Yes
Foreign Nationals work permit
Yes
Teacher placement Yes
Registration of labour unions, Employment unions Registration of work places Registration of Collective Agreements Registration of Safety & health Committees Registration of work place accidents
3 12 Registration of Institution & partner organisations
e-Transport
Generic information on the
Yes Yes Issuance/ Renewal of drivers license (National/
Yes
PricewaterhouseCoopers Page 322Confidential
Development of e-Government Strategy and Implementation PlanInception Report
Projects Total Services
Informational Services
G2C
G2B
Total Services
Transactional Services
G2C
G2B
application process, work flow, timelines, documents needed, ministry offices, work timings
International)
Notification of expiry/ renewal of insurance, licenses
Yes Yes Application for change of ownership of vehicles
Yes
Information on Public transport timings, tickets availability, routes, stops etc.
Yes Application and renewal of vehicle Insurance
Yes
Information on the traffic movement, special events, road works, Parking areas, detour information etc.
Yes Application for request of special numbers
Yes
Notification of traffic violations and penalties
Yes Online notification and collection of fines for traffic violation
Yes
Information on regulation, policies, and import duty for vehicles
Yes Online booking of tickets for inter state government transport
Yes
Vehicle Registration Yes
Vehicle Inspection Yes
6 8
e-Tourism Information on Tour Operators, Travel Packages, Itinerary, Fee
Yes Registration of private tour operators
Yes
Information about the Accommodations
Yes Registering for a Tour
Yes
Information regarding
Yes Registration of Hotels, Resorts,
Yes
PricewaterhouseCoopers Page 323Confidential
Development of e-Government Strategy and Implementation PlanInception Report
Projects Total Services
Informational Services
G2C
G2B
Total Services
Transactional Services
G2C
G2B
various resources , Cultural and heritage centers
Guest Houses and Local Accommodations
Information on Various GIS Mapping statistics
Yes Yes Booking a Hotel, Resort etc
Yes
Registering with the DMS for alerts
Yes
Supporting letter for film-makers ,Tourists to go abroad
Yes
Application for Tourist VISA on Arrival
Yes
Driving license equivalence for foreign citizens
Yes
Issuing Birth, Death and Marriage Certificates to foreign nationals
Yes
Permission to visit Heritage sites
Yes
4 10
e-Tax View Pending messages
Yes Yes Online application of Registration as a Taxpayer
Yes Yes
View Registration Data
Yes Yes Online filling of Tax Return (Land tax, Rental Housing tax (paid by owner), Turnover tax, TV tax, VAT, and Excise tax)
Yes Yes
View Field assessments
Yes Yes File a declaration Yes Yes
View list of decelerations not filed
Yes Yes Tax clearance certificate
Yes Yes
List previous Tax returns
Yes Yes TIN Number Registration
Yes Yes
Show filed declaration
Yes Yes Application for a tax holiday
Yes Yes
Budgetary information dissemination
Yes
PricewaterhouseCoopers Page 324Confidential
Development of e-Government Strategy and Implementation PlanInception Report
Projects Total Services
Informational Services
G2C
G2B
Total Services
Transactional Services
G2C
G2B
7 6
e-Court Management System
Buying & Selling Property Agreement
Yes Yes
Construction permit Yes Yes
Land Ownership Yes Yes
Rental Agreement(Transfer)
Yes Yes
Rental agreement (renewal/ownership)
Yes Yes
Land transfer Yes Yes
Property Registration
Yes Yes
Application for a Pleading
Yes Yes
Document Transfer Yes Yes
Case Filing Yes Yes
11 Adjourning Cases Yes Yes
e-Municipalit
y Management System
Information Provision about A.A. City Administration
Yes Request for Archives of News, Television Programs, Radio Programs
Yes
Download of Radio Program
Yes Application for sponsorship of News, Communications
Yes
Download of News
Yes Request to post News
Yes
Information on determination of design standards and preparation of design for construction of roads
Yes Request for Advertising different bids and names etc.
Yes
Give information about court case such as adjournment date.
Yes Appeal to damaged roads
Yes
Information on creating awareness for protecting the city from different pollution and
Yes Requests for the permission of blocking of the road temporarily
Yes
PricewaterhouseCoopers Page 325Confidential
Development of e-Government Strategy and Implementation PlanInception Report
Projects Total Services
Informational Services
G2C
G2B
Total Services
Transactional Services
G2C
G2B
natural resource degradationDistributing Organizational Structure for sub cities and center Offices
Yes Application for change of name.
Yes Yes
Distributing directives, guidance, rules and regulation concerning with promotion, allowance, transfer, requirement of employment discipline.
Yes Application for declaration of absence.
Yes Yes
Collect data about employees profile form all offices
Yes Application for succession Certificate.
Yes Yes
Provision of statistical analysis about employees’ profile.
Yes Application for marriage certificate.
Yes
Distribution of laws
Yes Application for certificate of guardianship.
Yes
Educational management information for researchers
Yes Issuance of Marriage Certificate
Yes
Information on how to get examinee ID
Yes Issuance of Divorce Certificate
Yes
News Release Yes Issuance of Birth Certificate
Yes
Press Release Yes Issuance of Non-Married Certificate
Yes
Documentation and dissemination of information
Yes Issuance of Death Certificate
Yes
Dissemination of declaration ratified by the council
Yes Issuance of license for mining
Yes
Information Yes Yes Environmental Yes
PricewaterhouseCoopers Page 326Confidential
Development of e-Government Strategy and Implementation PlanInception Report
Projects Total Services
Informational Services
G2C
G2B
Total Services
Transactional Services
G2C
G2B
on safety inspection and certification
Impact Assessment Permit.
Information on safety consultancy
Yes Request for environmental Lab test
Yes
Information on training and awareness
Yes Yes Request for disposal of solid waste
Yes
Request for park and recreation center/hall
Yes Receiving appeals from employees (Administrative court)
Yes
Information on how to get funeral service
Yes Recruit new employees for all sub cities and center offices
Yes
Information on the provision of ornamental seedlings
Yes Registration of complaints investigation and litigation sub process
Yes
Information on green area adoption and outsource service
Yes Registration of Tax appeal
Yes
Information on public relation mobilization and awareness
Yes Request for new water line
Yes Yes
Request for maintenance of Water/Sewerage lines
Yes
Request for sewerage service
Yes
Bill collection Yes
Registration of Private ECLSE examinees
Yes
Request for summer course registration
Yes
Request for grade 8 report card when they lost it
Yes
Request for buying laws
Yes
Receiving appeal Yes Yes
Preparing Structural Plan
Yes Yes
Preparing Local Yes
PricewaterhouseCoopers Page 327Confidential
Development of e-Government Strategy and Implementation PlanInception Report
Projects Total Services
Informational Services
G2C
G2B
Total Services
Transactional Services
G2C
G2B
development PlanCollecting land and land related data
Yes
Request for land and land related data (has transaction fee)
Yes
Yes
Yes
25 37 Yes
ePassport Status Check of ID Cards
Yes Application for Resident ID
Yes
Status Check of Passports
Yes Renewal of Resident ID
Yes
Replacement of Resident ID
Yes
Application for Passport
Yes
Renewal of Passport
Yes
Replacement of Passport
Yes
ID card issuance for foreign nationals
Yes
Issuing diplomatic and service visas
Yes
Verification of incoming and outgoing documents
Yes
2 9
Total Informational Services
Informational
Total Transactional Sevices
Transactional
Total Service
s
G2C G2B G2C G2B
79 61 41 140 102 68 219
List of services for Agencies
Sr. No.
Agencies Services Type of Service
1 Ethiopian Investment Agency
Information Services Informational
Licensing and Registration services Transactional
Investment Registration Transactional
Requesting for Business area Transactional
PricewaterhouseCoopers Page 328Confidential
Development of e-Government Strategy and Implementation PlanInception Report
2 General Education Quality Assurance and
Examination Agency(GEQAEA)
Registration of national examinees for examinations
Transactional
Examination Result Scoring Informational
Download of Certifications Transactional
Replacement certificates Transactional
Authentications of certificates Informational
3 Transport Authority Annual Vehicles Inspection Transactional
Drivers penalty management Transactional
New Driver license Issuance Transactional
Driver license renewal Transactional
Driving license Transfer to Region Transactional
New vehicles Registration Transactional
Vehicles ownership transfer Transactional
Annual Vehicles Inspection Transactional
Vehicles body change Transactional
Vehicles service change Transactional
Vehicles Transfer to Region Transactional
Garage Licensing and Renewal Transactional
Vehicle Importers and Assemblers Licensing and renewal
Transactional
Vehicle Inspection Organizations Licensing and Renewal
Transactional
Get Pass of (Drivers and Vehicles for neighboring countries)
Transactional
Membership Registration letters for operators to Associations
Transactional
Issuance for Transport Associations and Companies Competency Certificate
Transactional
Renewal for Transport Associations and Companies Competency Certificate
Transactional
Passenger Transport Dispatching and fleet management
Informational
Vehicle Import Permit Transactional
4 Social Security Agency Web-based information publishing Informational
Pension services (Pensioner registration, and pension payment)
Transactional
Services to business(regarding to goods and services)
Transactional
5 Revenue and Customs Online application of Registration as a Taxpayer Transactional
Online filling of Tax Return (Land tax, Rental Housing tax (paid by owner), Turnover tax, TV tax, VAT, and Excise tax)
Transactional
File a declaration Transactional
View Pending messages Informational
PricewaterhouseCoopers Page 329Confidential
Development of e-Government Strategy and Implementation PlanInception Report
Authority View Registration Data Informational
View Field assessments Informational
View list of decelerations not filed Informational
View list of assessment Informational
View list of transactions Informational
List previous Tax returns Informational
Show filed declaration Informational
Tax clearance certificate Transactional
TIN Number Registration Transactional
6 Federal Supreme Court
Application for a Pleading Transactional
Document Transfer Transactional
Case Filing Informational
Adjourning Cases Informational
7 Ethiopia Commodity Exchange
Market Data Dissemination Informational
Payment transfer Transactional
Membership registration Transactional
Commodity deposit Transactional
8 Department of Postal Service
Electronic money transfer Transactional
Domestic mail transfer Informational
Money transfer and payment system Transactional
Box rental Transactional
Pension services (Pensioner registration, and pension payment)
Transactional
9 Micro and Small Enterprise
Development Agency
Registration of SMEs; Transactional
10 ETC New Service (VPN, Internet) Transactional
Upgrade Transactional
Downgrade Transactional
Cancellation Transactional
CPE Change Transactional
Bill settlement Transactional
Online data service management Transactional
11 Addis Ababa City Administration
Download of Radio Program Transactional
Download of News Transactional
Vacancy Application Transactional
Application for sponsorship Transactional
News Transactional
Communications Transactional
Determine design standards for roads & prepare design for construction of roads or prepare it through qualified consultants.
Transactional
PricewaterhouseCoopers Page 330Confidential
Development of e-Government Strategy and Implementation PlanInception Report
Plan and study ways and means that have to prevent roads from damage and implement same upon approval. With the cooperation of the city government.
Informational
Give permit to requests to temporally block or to use roads for some purposes.
Transactional
Application for change of name. Transactional
Application for declaration of absence. Transactional
Application for succession Certificate. Transactional
Application for marriage certificate. Transactional
Application for certificate of guardianship. Transactional
Give information about court case such as adjournment date.
Transactional
Resident ID Transactional
Marriage Certificate Transactional
Divorce Certificate Transactional
Birth Certificate Transactional
Non-Married Certificate Transactional
Death Certificate Transactional
Permit mining and related activities to those who are in need of investing on mining development in accordance with sustainable environment.
Transactional
Expand environmental education and awareness creation for different time, places and levels.
Transactional
Exerts to pass development projects through the rules and procedures of environmental impact assessment.
Informational
Receiving appeals from employees (Administrative court)
Transactional
Recruit new employees for all sub cities and center offices
Transactional
Registration of complaints investigation and litigation sub process
Transactional
Registration of Tax appeal Transactional
Request for new water line Transactional
Request for maintenance Transactional
Request for sewerage service Transactional
Bill collection Transactional
Educational management information for researchers
Transactional
Information on how to get examinee ID Informational
Registration of Private ECLSE examinees Informational
PricewaterhouseCoopers Page 331Confidential
Development of e-Government Strategy and Implementation PlanInception Report
Request for summer course Transactional
Request for grade 8 report card when they lost it Transactional
Information on business areas/opportunities Transactional
Business requirement Information Informational
Registration of MSEs Informational
Registration of tax payers Transactional
Prepare Tax Identification number Transactional
Preparation and distribution of VAT Certificate Transactional
Preparation and distribution of assessment notification
Transactional
Auditing and preparing assessment paper Transactional
Collection of Tax Transactional
Giving clearance paper Transactional
Collecting local and foreign transaction of taxpayers
Transactional
News Release Transactional
Press Release Informational
Documentation and dissemination of information Informational
Dissemination of declaration ratified by the council
Informational
Receiving appeal Informational
Four Ministries that have not been included in the e-Government Strategy include
Ministry of Defence Ministry of Federal Affairs Ministry of Mines Ministry of Science and Technology
PricewaterhouseCoopers Page 332Confidential
Development of e-Government Strategy and Implementation PlanInception Report
Annexure XI: Overview of Stakeholder Assessment
The following chart gives a snapshot of the key findings of the Stakeholder Assessment across various dimensions and parameters.
Note: Methodology and analysis of the assessment was designed by PwC. The details of each of the dimensions/parameters and Ministries/Agencies is provided in Stakeholder holder Assessment Report. However a summary is provided in the next few pages
PricewaterhouseCoopers Page 333Confidential
Development of e-Government Strategy and Implementation PlanInception Report
Ministries and Agencies
Hardware and Networking
During the interaction with Ministries and Agencies it was found that most of the
ministries and Agencies are well equipped with the Hardware and LAN environment.
The availability of the Hardware and presence of LAN in the ministry/agencies is a good
indication for the e-Government implementation. This also indicated that the resources
are at-least familiar with technology and only strategic planning is required for the
effective implementation of the e-Government. However some of ministries such as the
Ministry of Youth and Sports and the Ministry of Urban works seem to be lagging
behind in terms of availability of basic IT infrastructure, nevertheless inventory of such
ministries/ agencies can be easily upgraded.
Software
Analysis of survey responses indicate that most of the ministries have some specialized
software developed for their internal use, which will benefit only the Employees/Staff of
that organization. Ministries pertaining to Agriculture, Finance, Foreign Affairs et is
also a necetera have HRMS and Inventory management system in place, similarly other
ministries have different applications developed for their internal use. While it is good
to have such applications, an exercise may be conducted to identify common
applications that can be implemented in all the Ministries and Agencies which can be
developed by a central agency, rather than each Ministry developing them individually
There is also a need to identify the citizen centric applications which could be
implemented across different Ministries/Agencies.
e-Services
Interestingly most of the ministries have recognized the importance of e-Services and
delivering some of the services online to the citizens of Ethiopia. The Ministry of
Transport and Communication provides two online services, similarly the Federal
Supreme Court and Ethiopian Commodity Exchange also provides online services to
benefit the citizens. However, most of the ministries and agencies are still their
planning phase of ‘going online’ with the services. Efforts have been made by the
Ministries and Agencies in this direction and they have identified the services that can
be rolled out in phased manner over a period of 2-3 years.
Capacity building
Most of the ministries and agencies feel the biggest challenge to implement e-
Government in Ethiopia is the availability of the technical manpower and capacity
building. Almost all ministries such as The Ministry of Labour and Social Affairs, The
Ministry of Foreign Affairs, The Ministry of Youth and Sports et cetera, have raised a
concern about the lack of technical manpower in their respective organization.
Policies, Standards and Guidelines
PricewaterhouseCoopers Page 334Confidential
Development of e-Government Strategy and Implementation PlanInception Report
In the feedback given by the ministries / agencies one of the key components –
Standards and Guidelines’ is completely missing. Only The Ministry of Transport and
Communication has shown some level of maturity in terms of the relevant policies
defined for the organization for the effective implementation of the e-Government.
However most of the ministry/agency have one or two policies defined in place. There is
a need to design a policy framework with guidelines across the Ministries for
implementation of e-Government.
Security
The Ministry of Justice and The Ministry of Youth and Sports have raised concern on
the security of the data and applications. It is extremely necessary for the e-
Government applications to be secure and ‘hack-proof’ from any attack. During the
discussion with the ministries it is evident that a framework is required to ensure the
security of Government Data and Transactions.
Integration
The survey indicates that Ministries are interacting with each other and sharing
information. But there is no interface for the information interchange. Ministries are
not concentrating on the information sharing with other ministries by means of
electronic channel. However some of the Ministries (Ministry of Education, Ministry of
Trade and Industry, Ministry of Finance) have raised the issue of forming a framework
at a ational level for such an integration.
Focus Area
The success of e-Government across the world is increasingly being measured by the
benefits it creates for Customers (constituents, citizens and business communities).
However, the survey data indicated that the focus of the business applications
purchased or developed by Ministries/Agencies is mainly on improving internal
efficiency rather than focusing on delivery of Customer services. While internal
operational efficiency is a necessity, this emphasis on internal business applications
indicate an inward-looking emphasis by Ministries/Agencies, rather than a more
strategic and integrated approach to e-Government, where on-line Customer services
are identified for implementation and internal applications support this.
ICT infrastructure Usage
The Ethiopia ICT infrastructure is well equipped with a Data centre which is
highlighted with the presence of “Woreda Net”. Also the call centre facility is in
operational condition. The survey findings indicate that the shared ICT infrastructure is
under-utilized and there is scope to make these facilities more popular among the
ministers and agencies.
Donors
World Bank
PricewaterhouseCoopers Page 335Confidential
Development of e-Government Strategy and Implementation PlanInception Report
Major initiatives: Poverty Reduction, Infrastructure – Transport and ICT, Water Supply, Education, Health, Agriculture, Private sector development Anti Malaria Campaign, Rural water supply, Food Security Initiative, Sustainable Land Management, Basic education, Post secondary education.Challenges for Citizen Services: Being a Federal Government, there are challenges in building capacities and implementing e-Government solutions at isolated regions.
United Nations Major initiatives: Build Local Capacity, Millennium Development Goals such as Poverty Reduction, Crisis Prevention, HIV/AIDS treatment, Environment, ICT and EnergyMillennium Development Goal too reduce poverty, provide primary education, Empower Women, Reduce child mortality, Anti HIV and malaria initiativesChallenges for Citizen Services: There is a need to strengthen the local capacity to implement e-Government in the Country.
Spanish Development CorporationMajor initiatives: Sectoral Development, Health, Food Security, Agriculture, ICT Infrastructure, Gender Issues, Culture Public Basic Services to provide basic health and education , ADG- Agri Growth Program, ,Infrastructure and Capacity BuildingChallenges for Citizen Services: Need for incentive schemes to the citizens, to increase the usage of IT services
African Development BankMajor initiatives: Socio Economic development for Africa, Poverty Reduction, Living Conditions Improvement, ICT, Technical and Financial Assistance to the local Government.Fertilizer Financing, Water facilities, Women Entrepreneurship, Small scale Industries, Agro Industries, Sanitation, Ethiopia-Djibouti Linking infrastructure
Challenges for Citizen Services: Mobilization of Resources, Uneven distribution and access to resources
Business
The survey of private companies reveals that the Access to the ICT infrastructure in
terms of availability of computers and peripherals; network connections both internal
and external; and connectivity are the major ICT challenges that these companies face
in their operations. The other major challenges expressed by the private companies are
the high cost of ICT access. An ADSL connection of 2 Mbps costs more than 45,000 ETB
per month in tariffs. But voice data and wireless telephone tariffs are very cheap (0.20
Birr/6 Min for calls within same city and 0.40 Birr/ Min for calls within same tariff
zones) and are the major means for communication in private companies.
PricewaterhouseCoopers Page 336Confidential
Development of e-Government Strategy and Implementation PlanInception Report
Companies also find the import duties on ICT equipments to be exorbitant. The
peripherals and additional equipments such as printers etc do not fall under ICT goods
and hence the companies spend large sums of money on such equipments.
The private ICT companies also find a lack of domestic demand since the ICT Market in
Ethiopia is yet to mature to a self sustainable state. as almost all the ICT equipments
are imported. The companies in the ICT equipments sector mainly operate as resellers,
dealers or maintenance and services. The duties and the taxation on products are
passed on to the customers this reduces the margins for these companies
The major demand for ICT in Ethiopia comes from the Government but the procurement
policies of Government make it almost impossible for the local companies to compete or
participate in the bidding process. Firstly, the private companies do not have the
experience that the procurement guidelines stipulate due to which the local companies
get disqualified. Secondly the local companies do not have resources in terms of staff or
infrastructure to carry out large projects of the Government. Hence it is essential for a
collaboration of the Public and Private sectors of the country to mutually help each
other in building a stronger domestic market.
PricewaterhouseCoopers Page 337Confidential
Development of e-Government Strategy and Implementation PlanInception Report
Customers
Based on the Survey responses and interaction with the citizens the overall key observations are as follows:
a) The table below specifies the most commonly used Services / Service Organization by the Citizens of the Ethiopia.
1. Census2. Commercial bank
of Ethiopia3. Education4. Electricity / Power5. ERTA (Radio /
Television)
6. Health services7. Internet8. Mobile / SMS9. Municipality
services10. Passport11. Police
12. Taxpaying13. Telephone14. Transportation15. Water
b) The table below specifies the most commonly used Government Website by the Citizens of Ethiopia.
Sr. No. Site Address Ministry / Agency / Bureau1 http://www.erta.gov.et/ Ethiopian Radio and Television Agency2 http://www.ethionet.et/ Ethiopian Telecommunications
Corporation3 http://www.ena.gov.et/ The Ethiopian News Agency4 http://www.amhcbb.gov.et/ Amhara National Regional State
Capacity Building Bureau5 http://
www.ethiopianairlines.com/Ethiopian Airlines
6 http://www.mu.edu.et/ Mekelle University official Website7 http:// www.bdu.edu.et/ Bahir Dar University website
c) The table below specifies the feedback received and analysed for some of the key questions that is useful for planning of the future roadmap of the e-Government in Ethiopia.
Sr. No. Question Analysis1. Do you know / have you heard about e-
Government initiatives of Government of Ethiopia?
Only 30%-35% people heard about such initiatives
2. Have you ever used internet to access the website of a government agency?
Only 20%-30% people use internet as a medium to access the Government services
3. What are the key benefits that you expect from e-Government?
Most of the people want “Faster Delivery of Services”
Then people prefer to avail services through “One Stop Shop for Services”
PricewaterhouseCoopers Page 338Confidential
Development of e-Government Strategy and Implementation PlanInception Report
“Lower cost of obtaining Service”
4. What could the Government do to encourage you to use online Government Services?
Citizens of Ethiopia suggested to “Reduce cost of internet access, including hardware /software” and the second on priority will be “Make services easy to use” and then to “Increased awareness of availability”
5. For users’ convenience, the Government plans to use alternate channels for providing Public Services.
People want the government services to be delivered through “Mobile” then by “Internet” and then by “Call Centre”
PricewaterhouseCoopers Page 339Confidential
Development of e-Government Strategy and Implementation PlanInception Report
Annexure XII: Scope of work for Baseline Survey Agency
The survey will be designed to establish a baseline against which the accrued benefits in terms of improvements in the government’s services delivery mechanism and the increase in satisfaction levels of the customers due to the ongoing e-Government program can be compared. Further, the survey is envisaged to be a tool to capture some of the key issues, opportunities and challenges for the e-Government program as it moves into its next phases of development.
The project will consist of four phases as follows:
Survey Design phase Information Gathering phase Data Analysis phase Output and Reporting phase
1. Survey Design phase
Survey objectives
The key objectives of the e-Government Satisfaction Survey are to understand the following:
Awareness regarding e-Government and its activities among major groups of users. Detailed Usage and Accessibility of all e-Government Services. Satisfaction with various services among the major stakeholders.
Target Population
The e-Government users are divided into three broad segments: citizens, business and government; thus three separate modules will be conducted to collect the required information:
The sample size for residents should be such that it is a true representative sample of residents of Ethiopia in terms of Nationality (Citizens and Residents), Age and Education.
Target respondents for Business and Government
Responsible for e-Government needs in the organization (Decision makers or Influencers)
Following sectors will be included in survey:o Agriculture
o Education
o Health
o Municipalities
o Labor and Social affairs
o Justice
o Tax
PricewaterhouseCoopers Page 340Confidential
Development of e-Government Strategy and Implementation PlanInception Report
o Trade
o Transport & Communication
The pretest
The pretest is crucial because it allows field-testing the questionnaire on a selected small sample of the population. The results of the pretest usually suggest that some modifications must be made before a full-scale sampling is undertaken.
2. Information Gathering Phase
Citizens sample design
The Vendor will draw a sample from the citizen's population with the following criteria:
Cluster sampling: Classifying target population into seven regions.
Strata sampling: Stratify each region according to citizens or residents with corresponding proportion for each type obtained from population census.
The sample will be drawn by simple random sample method.
Business and Government Sample design
The Vendor will draw a sample from the business population with the following criteria:
Cluster sampling: Classifying target population into three groups of establishments according to the size.
Stratify sampling according to industry type with proportionate representation for each type obtained.
The sample will be drawn by simple random sampling method.
Sample size for Residents
The sample size for residents should be such that it is a true representative sample of residents of Ethiopia in terms of Nationality (Citizens and Residents), Age and Education as per census.
Sample size for Business
The indicative sample size for Business is illustrated below in Table
Table: Sample size of Businesses
Industry Sample Size
Sample Propositions
Agriculture 29 14%
Financial, Insurance, Real estate & Business services
42 21%
Health care 6 3%
Hotels + Restaurants 40 20%
Manufacturing industries 26 13%
PricewaterhouseCoopers Page 341Confidential
Development of e-Government Strategy and Implementation PlanInception Report
Transport, IT and Communication
8 4%
Wholesale and Retail trade 31 16%
Business Services (Ad agencies / Consultants) etc
18 9%
Total 200 100
Methods of measurement
For the citizens' survey,900 face to face interviews and 600 telephonic interviews for residents and 200 face to face interviews for Businesses and the Government respectively will be conducted using a structured questionnaire. The interviews will be performed in English or Amharic as convenient to the respondent. Interview length will be determined from pre test procedure.
Selection and training of field workers
The field-workers must carefully be trained in what measurements to be made and how to make them during the interviews. Training is especially important if interviews because the rate of response and the accuracy of responses are affected by the interviewer’s personal style and voice.
Data Validation and Quality Control
Daily checks on the collected questionnaires will be made after collecting them from the field to ensure that data are correct and clean. Every questionnaire will be reviewed in order to insure the quality of the collected data.
Data Entry
The vendor shall use SPSS Data Entry software or any appropriate software
3. Data analysis phase
Describing Data
The vendor will describe data through the following techniques:
Count responses
compute descriptive statistics
compare groups
plot data
Index Number
The Vendor will create index number for e-Government Satisfaction with respect to international definitions and maintain background documentation on sources and methods.
PricewaterhouseCoopers Page 342Confidential
Development of e-Government Strategy and Implementation PlanInception Report
The Satisfaction Index will be composed from the following sub-indices:
Government Satisfaction Index
Citizens Satisfaction Index
Businesses Satisfaction Index
Cluster Analysis
Clustering is the classification of audience and stakeholders into different groups, or more precisely, the partitioning of respondents into subsets (clusters), so that the data in each respondents subset (ideally) share some common trait - often proximity according to some defined distance measure. This will be done in order to explore the heterogeneity of the different stakeholders and audiences.
4. Outputs Phase
The Report
The report should cover the following elements:
The beneficiary and the applied methodology.
The poll objective
Population of the research
Sampling techniques
Pre-test procedure
Evaluation of the poll outcome
Full description of results.
Concluding remarks
Reports will be generated as follows:
A draft report 10 weeks after the signature of the contract.
Final report, in draft form 1 weeks prior to the end of the contract to allow for comments by the beneficiary and the donor (if any) to be incorporated.
Number of reports copies will be three hard copies & one electronic copy.
The final report will be presented in English and Amharic with translation provided by the POC.
Presentation
Summary conclusion and summary of e-Government Satisfaction Survey will be presented.
PricewaterhouseCoopers Page 343Confidential
Development of e-Government Strategy and Implementation PlanInception Report
Annexure XIII: Scope of work for Marketing and Awareness Agency
The scope of work of the consultant will be: To review the media plan for the proposed Public awareness campaign. To recommend a comprehensive communications strategy and creative for all mass
media, viz. television, radio, print etc. This should include a comprehensive media plan, media schedules based on prioritisation of different mass media taking note of different target groups. A comprehensive strategy, including a media plan for both the campaigns needs to be evolved.
To suggest concept design for production of TV commercial (60/30/10 seconds) To suggest concept design for production of radio jingle (60/30/10 seconds), To suggest concept design for production of print advertisements of different sizes. To recommend a public relation/ publicity strategy covering the entire gamut of the
media. To recommend the need for and assist in organising Events/ Rallies /Exhibition for
effective outreach. To suggest the modalities of outdoor publicity. To suggest the concept and design of Internet Advertising/ campaigns using mobile
phones. To recommend the use of Direct Marketing in this endeavor.
Additionally the consultant would be responsible for the following:
Preparing a comprehensive Media Strategy Plan (MSP) that could help leverage the maximum outcome from the Communications campaigns.
Review and implementation of the Communications plan while also help supplement the efforts to create awareness amongst the larger section of stakeholders. It must prepare a Media Implementation Plan (MIP) for this purpose. The plan must take note of the complementarily of the different target groups and ensure that there is no overlap amongst various different kind of communications.
Prepare, based on the respective requirements of the campaign, separate creatives for print, audio, video, internet and other related Communications. It must prepare a Media Creative Plan (MCrP) for this purpose. The plan must highlight different creatives to address different target groups to effectively communicate the message.
Develop time frame for insertions – time releases / media initiatives for sustained visibility at key centres and liaise with target media to bring out special reports on activities / events. It must prepare a Media Scheduling Plan (MSP) for this purpose.
Examine the replicability of the media plan to cover all stakeholders and media. It must prepare a Media Replicability Plan (MRP) for this purpose.
Strategically and proactively develop the theme / concept for advertisements, press meets, news releases, articles and other promotional initiatives targeting local, national & international Communications. It must prepare a Media Thematic Plan (MTP) for this purpose.
Communications Scanning / Feedback from across a minimum of 10 centres: Maintain Communications watch / Communications intelligence for any development that may impact the Government; and provide reports of press
PricewaterhouseCoopers Page 344Confidential
Development of e-Government Strategy and Implementation PlanInception Report
clippings, TV, online news items, etc. It must prepare a Media Feedback Plan (MFP) for this purpose.
Undertaking media training at various levels including refresher modules for relevant spokespersons, basic communication process flows & skills equipping media workshops for all public access points within the organisation and Crisis Communication i.e. help prevent negative news and counter such news if at all it appears and develop a crisis communication module at the outset. It must prepare a Media Training Plan (MTrP) for this purpose.
Create a positive mindset, inculcate a sense of ownership among employees and instill customer orientation by undertaking suitable programmes / interactive sessions. This must also be a part of the MTP.
Undertake Influencer / Opinion Leader Outreach by highlighting the objectives and relevance of Stakeholders Efficiency with a view to positively influencing opinion leaders through initiatives like Seminars, Conferences and Presentations. This must also be a part of the MTP.
PricewaterhouseCoopers Page 345Confidential
Development of e-Government Strategy and Implementation PlanInception Report
Annexure XIV: Job Descriptions of the IT Officials at the Ministry
No.
Title Background and Qualifications
1. Chief Information Officer (CIO)
• Master’s degree in Information Technology, Management Information Systems, Business Administration, or related field
• Minimum of 8 years of senior management experience in managing a large organization’s information technology strategic plan
2. Project Champion (s) (Domain)
• Undergraduate/Masters degree in engineering/Computer Science
• Project Management Certification
• 10+ years of relevant work experience
IT Capacity Building Expert
• MBA with focus on Capacity Building/Change Management
• 8+ years of experience
• Desirable to have additional certification or training in e-Governance, change management, change psychology or mass communication
Government Process Re-engineering Expert
• Degree in economics, accounting, information technologies, business or public administration or similarly relevant discipline;
• At least 10 years of working experience in business process management and change within Government organizations.
• At least 5 years international experience in undertaking similar assignments within a Government environment where processes are subject to laws, rules, habit, conservatism, patronage and a long history of total reliance on multi-stage, multi-authorization manual, paper-based processes involving people at all levels of Government
Domain Experts • Masters Degree in Business Administration/Engineering
• Over 15 years of experience in the relevant area of expertise
• At least 10 years of hands-on experience in the relevant areas
3. Technical Solution Architect
• Masters Degree in Computer Science or Engineering• 8+ years of experience with at least three years as a
Technology Architect in multiple full life cycle software development projects
• Certified as an Architect
IT Infrastructure Expert
• Undergraduate/Masters degree in engineering, preferable Computer Science
• 8+ years of work experience, at least 4 years in
PricewaterhouseCoopers Page 346Confidential
Development of e-Government Strategy and Implementation PlanInception Report
technical program management• Should have certifications such as ITIL certification /
BS7799 auditing certification, CCNP/PIX/CCSA etc.
IT Security Expert • Undergraduate/Masters degree in engineering, preferable Computer Science
• 8+ years of work experience, at least 4 years in technical program management
• Should have CISA / CEH / ITIL certification.
Application Expert • Undergraduate/Masters degree in engineering, preferable Computer Science
• 8+ years of work experience, at least 4 years in technical program management and software development
• Should have experience in IT application development/ Software Development/ Enterprise-Wide systems integration.
PricewaterhouseCoopers Page 347Confidential
Development of e-Government Strategy and Implementation PlanInception Report
Annexure XV: Job Descriptions of the ITSG to support in the Ministries
No.
Title Background and Qualifications
1. Project Coordinator • Post graduate in Management with PMP certification.
• Minimum 8 years of experience in IT industry with 3 years in a Project Manager role
Project Design Expert
• Master's degree in Business Administration/social science
• Minimum of ten years experience in design, implementation, and evaluation of overseas development projects
• Knowledge and experience of different social science techniques including focus group research, key information interviews and surveys
PPP Expert • Minimum Masters Degree in Business Administration/Public Administration/ Rural development and Communication or any related field from a reputed institute.
• Minimum ten years of experience in providing technical assistance in developing and implementing PPPs or related activities resulting in for profit infrastructure investment
• Proven track record of successful capacity building and association with PPP transactions that have reached closure.
• Familiarity with PPP best practices.
Standards and Policies
Expert
• Post graduate in Management/Information Technology
• Minimum 8 years of experience in developing standards and policies
Project Management
Expert
• Post graduate in Management with PMP certification.
• Minimum 8 years of experience in IT industry with 3 years in a Project Manager role
Solution Design Expert
• B.E. (Computer/E&C)/MCA from a premier institute with minimum 10 years of experience.
• Ability to define functional / technical architecture with good understanding of non-functional requirements & technology risks
• Hands on experience on various technologies including Open Standard Platforms
PricewaterhouseCoopers Page 348Confidential
Development of e-Government Strategy and Implementation PlanInception Report
Annexure XVI: Key Considerations during Procurement Process
Donor agencies, worldwide, are increasingly demanding transparency in the manner in which their funds are utilized by the implementing agencies. This is mainly to ensure that the funds are used for the purposes intended, with due attention to economy and efficiency; mitigating risk of misuse. One of the key aspects that the donors look at is procurement.
Different donors have their own guidelines which need to be followed while carrying out the activities under a project, include those related to procurement. Some donors (such as The World Bank) do not finance expenditures for contracts which have not been procured in accordance with the prescribed procedures/guidelines and would normally not reimburse such amounts to the implementing agencies.Type of procurement activities of the borrowers may include procurement of goods, works and consultancy & other services.
PricewaterhouseCoopers Page 349Confidential
Development of e-Government Strategy and Implementation PlanInception Report
PricewaterhouseCoopers Page 350Confidential
Selection of other than the lowest bidder
Selection of a bidder followed by change in price or scope
Disqualification of winning bidder and re-bidding
Contracts repeatedly awarded to one contractor/ repeat sole-source awards
Rotating Awards to different bidders
Evaluation criteria not consistent for different bidders
Project official insisting on award to certain suppliers
Same (few) vendors bidding Re-bid results identical to
original bids Similarities in bids Persistent high bid prices Apparent connection
between bidders Changes in the bids made
after their formal receipt Successful contractors use
competitors as sub-contractors
Exceptions to tender
Inadequate needs analysis Bid specifications too
narrow or too vague Unduly short supply period Unreasonable
prequalification requirements
Unreasonably short time to submit bids
Evaluation of bidsBiddingInvitation of bids
Significant Issues in Procurement
Receipt of goods/ services
Award of contractReceipt & Evaluationof bids
Request for proposal/quotation
Indenting by User department
Assessmentof need
Procurement life-cycle
Kinds of Frauds in Procurement: Kickback from vendors Conflicts of interest Favouritism Personal purchases Split purchases Bid rigging by vendors False and/or inflated invoicing by
Challenges faced: Obtaining information from project officials,
particularly government officials, due to bureaucracy
Difficulty in document retrieval in case of time gap between the time of execution of the procurement and the date of review.
Lack of awareness among project officials
Development of e-Government Strategy and Implementation PlanInception Report
Basic rules for vendor Short listing Vendors during Procurement of IT Services
Individual companies or consortium of companies operating in different domains identified for short listing process (Application Development, Hardware Procurement, IT Infrastructure Management, Networks, Telecommunication, Training, and Technical Helpdesk Operations) can bid. Consortium with representatives from maximum number of domains will be preferred.
In the event of a consortium, one of the partners shall be designated as a “Lead Partner”. However, every member of the consortium shall be equally responsible and jointly and severally liable for the successful completion of the entire project .The prime bidder is encouraged to form consortium with companies operating in or based in Ethiopia.
The prime bidder and all consortium members should have ISO 9001: 2000 certification or equivalent. Preference shall be given to bidders with business specific latest versions of certifications like CMMi, PCMMi, and ISO and Environmental & Corporate Governance accreditations.
The Prime Bidder has to be an Information Technology Company registered under the existing rules and regulations in the respective country since last 5 years.
Bidder can also submit if they have any country specific registrations as Technology Company.
The bidder need to have an office in the African Region for past 5 years or at least one of the consortium partners should comply with the condition.
The Prime Bidder should have positive annual turnover of more than <<USD 100 Million>> from all the domains for each of the last three Financial Years ending. If bidding for single track out of three tracks, the bidder should have a positive turnover of more than <<50 Million>> in the particular track. For 2 tracks, the turnover should be <<USD 75 Million>>
An undertaking (self certificate) that the bidder and all consortium partners are not blacklisted by a Government institution and there has been no litigation with any government department on account of similar services. The prime bidder can submit the same on behalf of other consortium partner also, However, MoC&IT, on its discretion, can ask for individual declarations also.
The bidder is required to provide detailed information on the projects executed by them, regional/country presence and resources to establish their credentials for evaluation
PricewaterhouseCoopers Page 351Confidential
Development of e-Government Strategy and Implementation PlanInception Report
Annexure XVII: Costing details of Individual Projects
Costing AssumptionsAssumptions and Unit Rates - General
Key Assumptions - General
Rate Hardware Unit Costs (In Birr.)
Salaried / Contract Staff
Unit Costs (In Birr.)
Others Items
Unit Costs (In Birr.)
Salary Growth Rate
0.10 Servers ( with System Software)
200,000.00
Project Manager
180,000.00
User Training per person
10,526.32
IT Equipment
0.10 Personal Computers( with OS, MS office and Antivirus solutions)
17,000.00
Solution / Application Architect
180,000.00
Change Management
3,508.77
Hardware/Software AMC
0.10 Multifunctional Printer/Scanner/Photocopier
45,000.00
Domain Expert
180,000.00
Office Maintenance (Electricity, water, maintenance, diesel cost etc) per office
84,210.53
Maintanence Cost
0.05 Networking and cabling( Router, Switch, Cabling)
140,350.88
Database administrator
180,000.00
Consumables (Paper, stationery, toners etc.) per
4,210.53
PricewaterhouseCoopers Page 352Confidential
Development of e-Government Strategy and Implementation PlanInception Report
officeNumber of employees to be provided with PCs
0.75 Generator Set (5KVA)
26,315.79
Support Staff
120,000.00
Number of Printers for Total PCs
0.50 Digital Camera
7,017.54
Web administrator
120,000.00
Software
Unit Costs(In Birr.)
Software development cost per man-month
87,719.30
S/w Developer
120,000.00
Data Digitization Software
1754.39
Percentage of total employees to be trained
0.90 Editorial Team - Editor
120,000.00
Percentage of total employees Targetted for change management
0.90 Editorial Team - Asst Editors
168,000.00
Per record digitization cost
3.51 Editorial Team - Support
144,000.00
Ethiopian Birr (In. Rs.)
2.85
Team Leaders - PMO
180,000.00
Team members - PMO
120,000.00
PricewaterhouseCoopers Page 353Confidential
Development of e-Government Strategy and Implementation PlanInception Report
Assumptions and Unit Rates - Priority Project-wise
Agriculture
Number
Benefits Management
Number
Education
Number
eHealth
Number
Total No. of employees
200.00
Total No. of employees
150.00
Total No. of employees
500.00
Total No. of employees
500.00
Number of offices
20.00
Number of offices
20.00
Number of offices
20.00
Number of offices
20.00
Total number of records to be digitized
100,000.00
Total number of records to be digitized
500,000.00
Total number of records to be digitisd
500,000.00
Total number of records to be digitisd
500,000.00
Software Unit Costs(In Birr.)
Software Unit Costs(In Birr.)
Software
Unit Costs(In Birr.)
Software
Unit Costs(In Birr.)
Agriculture Information Management System
5,263,157.89
Benefits Information and Managements System
7,017,543.86
Education Information and Managements System
7,017,543.86
Health Information and Managements System
7,017,543.86
Number of man-months for development of Software
60.00
Number of man-months for development of Software
80.00
Number of man-months for development of Software
80.00
Number of man-months for development of Software
80.00
G2B Portal
Number
Employment
Number
Transport
Number
Tourism
Number
Total No. 15.0 Total No. of 250. Total 250. Total 200.
PricewaterhouseCoopers Page 354Confidential
Development of e-Government Strategy and Implementation PlanInception Report
of employees
0 employees 00 No. of employees
00 No. of employees
00
Number of offices
1.00 Number of offices
20.00
Number of offices
20.00
Number of offices
20.00
Total number of records to be digitized
0.00 Total number of records to be digitized
500000.0
0
Total number of records to be digitized
500000.0
0
Total number of records to be digitized
10,000.00
Software Unit Costs(In Birr.)
Software Unit Costs(In Birr.)
Software
Unit Costs(In Birr.)
Software
Unit Costs(In Birr.)
G2B Portal
3,508,771.93
Employment Information and Managements System
5,263,157.89
Transport Information and Managements System
7,894,736.84
Tourism Information and Managements System
5,263,157.89
Number of man-months for development of Software
40.00
Number of man-months for development of Software
60.00
Number of man-months for development of Software
90.00
Number of man-months for development of Software
60.00
Tax Number
eCourt Number
Municipalities
Number
Ministry of Foreign Affairs
Number
Total No. of employee
250.00
Total No. of employees
200.00
Total No. of employ
250.00
Total No. of
250.00
PricewaterhouseCoopers Page 355Confidential
Development of e-Government Strategy and Implementation PlanInception Report
s ees employees
Number of offices
20.00
Number of offices
20.00
Number of offices
20.00
Number of offices
20.00
Total number of records to be digitized
700,000.00
Total number of records to be digitized
10,000.00
Total number of records to be digitized
500,000.00
Total number of records to be digitized
10,000.00
Software Unit Costs(In Birr.)
Software Unit Costs(In Birr.)
Software
Unit Costs(In Birr.)
Software
Unit Costs(In Birr.)
Tax Information and Managements System
7,894,736.84
eCourts Information and Managements System
5,263,157.89
Municipalities Information and Managements System
5,263,157.89
Passport
5,263,157.89
Number of man-months for development of Software
90.00
Number of man-months for development of Software
60.00
Number of man-months for development of Software
60.00
Number of man-months for development of Software
60.00
Assumptions and Unit Rates - Other projects
eGovernment Portal
Number
Contact Center
Number
Capacity Building
Number
Common Service Center
Number
Maximim number of
3000.00
Number of
8.00 Total Num
800.00
PricewaterhouseCoopers Page 356Confidential
Development of e-Government Strategy and Implementation PlanInception Report
calls per day
PCs per Training Center
ber of CSC
Number of Hours in a Shift 8.00
Number of Training Centers
20.00
Number of Operators in each CSC 4.00
Number of calls handled in one 1 hour by an Agent, Assuming 5 minutes per call
12.00
Number of Employees
44.00
Total Number of Operators
3200.0
0Hardware
Unit Costs (In Birr.)
Total number of Calls handled by an agent in a day
96.00
High-end Server
2,807,017.54
Total number of Agents required
31.25
Salaried / Contract Staff
Unit Costs (In Birr.)
Salaried / Contract Staff
Unit Costs (In Birr.)
Software Unit Costs (In Birr.)
Supervisors Required 2.00
Business Process Re-engineering Expert
771,929.82
IT Admin
526,315.79
Directory Services
526,315.79
Number of offices
1.00 PPP Expert
771,929.82
Site Inspection and Audit Manager
385,964.91
Integration
350,
Salaried / Contract
Unit Cost
Advanced
771,
CSC Front
42,1
PricewaterhouseCoopers Page 357Confidential
Development of e-Government Strategy and Implementation PlanInception Report
services 877.19
Staff s (In Birr.)
Technologies Expert
929.82
Staff 05.26
Upgradation costs
175,438.60
Call Center Shift Manager
385,964.91
Software Development Expert
771,929.82
HR&Admin Manager
578,947.37
Content Development
175,438.60
Call Center Team Leader
315,789.47
Trainers
350,877.19
Finance Manager
578,947.37
Call Centre Executives
231,578.95
Software
Unit Costs (In Birr.)
Hardware Unit Costs (In Birr.)
CBT - Training content development
1,578,947.37
Calling Equipment
8,771.93
Central Knowledge Management Portal
526,315.
79IVRS & Call Routing
350,877.19
Other Cost
Unit Costs (In Birr.)
Site Preparation
175,438.60
Leadership Orientation (4 batches of 10 people each)
701,754.
39Software Unit
Costs (In Birr.)
Project Management (4 batches of 10 people
3,000.00
PricewaterhouseCoopers Page 358Confidential
Development of e-Government Strategy and Implementation PlanInception Report
each)Call Centre Software (eg Clarity)
1,578,947.37
Vendor Management (4 batches of 10 people each)
1,666.67
Other Cost Unit Costs (In Birr.)
SLA Design and Monitoring (4 batches of 10 people each)
1,666.67
Lease cost per year
526,315.
79
Customer orientation and support (4 batches of 20 people each)
666.
67
Standards & Policies
Number
Marketing & Awareness
Number
Mobile Gateway
Number
Total No. of employees
20.00
Total No. of employees
WAP Server
3508.77
Number of offices
1.00 Number of offices
Content Converter
3508.77
Total number of records to be
0.00 Total number of records to be digitized
PricewaterhouseCoopers Page 359Confidential
Development of e-Government Strategy and Implementation PlanInception Report
digitizedSalaried / Contract Staff
Unit Costs (In Birr.)
Salaried / Contract Staff
Unit Costs (In Birr.)
CIO 877192.9
8
Marketing Director
771,929.82
Data & Process Expert
771929.8
2
Manager - PR
473,684.21
Technology Expert
771929.8
2
Marketing/PR Professional
385,964.91
Service Delivery Expert
771929.8
2
Cost of Hiring Marketing/PR agency
385,964.91
Security Expert
771929.8
2
Other Cost Unit Costs (In Birr.)
Legal Expert
771929.8
2 Direct Mailers
26,679.6
7
Billboards
32,000.0
0
Advertisements in Print Media
33,696.0
0
Radio Advertisements
56,400.0
0
Television Advertisements
99,000.0
0
Online Marketing
66,679.6
7Events
PricewaterhouseCoopers Page 360Confidential
Development of e-Government Strategy and Implementation PlanInception Report
66,679.6
7Branded Gifts / Paraphanelia
33,339.6
7
Content Development
200,000.
00
Priority Project -AgricultureS.no.
Item Unit Cost (Cost in Birr.)
Quantity/Number of units
Year 1 (Cost in Birr.)
Year 2 (Cost in Birr.)
Year 3 (Cost in Birr.)
Year 4 (Cost in Birr.)
Year 5 (Cost in Birr.)
ICapital Expenditure
(A) HardwareServers (Includes AMC for 5 years)
200000 2
400000
40000
40000
40000
40000
Personal Computers (Includes AMC for 5 years)
17000 50
850000
85000
85000
85000
85000
Printers/Scanner/Photocopier
45000 25
1125000 0 0 0 0
Networking and Cabling
140351 20
2807018 0 0 0 0
Generator Set2631
6 205263
16 0 0 0 0
Digital Camera 7018 201403
51 0 0 0 0
Sub-Total (A)5848
6841250
001250
001250
001250
00(B) Software
Agriculture Information and Management System (Includes AMC for 5 years)
5263158 1
5263158
526316
526316
526316
526316
Data Digitisation3508
77 13508
77 0 0 0 0
Sub-Total (B)5614
0355263
165263
165263
165263
16II Operational
PricewaterhouseCoopers Page 361Confidential
Development of e-Government Strategy and Implementation PlanInception Report
Expenditure( C )
Salaried / Contract Staff
Project Manager1800
00 11800
001980
002178
002395
802635
38Solution / Application Architect 0 1 0 0 0 0 0
Domain Expert1800
00 23600
003960
004356
004791
605270
76Database administrator 0 1 0 0 0 0 0
Support Staff1200
00 44800
005280
005808
006388
807027
68
Sub-Total ( C)1020
0001122
0001234
2001357
6201493
382 (D) Others
User Training1052
6 1809473
689473
684736
844736
84 0Change Management 3509 180
315789
315789
157895
157895 0
Office Maintenance8421
1 201684
2111768
4211856
8421949
6842047
168
Consumables 4211 208421
18842
19284
29748
41023
58
Sub-Total (D)3031
5793120
0002581
2632678
7472149
527
Total (A+B+C+D)15514298
4893316
4466779
4687683
4294225
Priority Project II - Benefits ManagementS.no.
Item Unit Cost (Cost in Birr.)
Quantity/Number of units
Year 1 (Cost in Birr.)
Year 2 (Cost in Birr.)
Year 3 (Cost in Birr.)
Year 4 (Cost in Birr.)
Year 5 (Cost in Birr.)
I Capital Expenditure (A) Hardware
Servers200000 2
400000
40000
40000
40000
40000
Personal Computers170
00 38637500
63750
63750
63750
63750
Printers/Scanner/Photocopier 450 19 843 0 0 0 0
PricewaterhouseCoopers Page 362Confidential
Development of e-Government Strategy and Implementation PlanInception Report
00 750
Networking and Cabling140351 20
280701
8 0 0 0 0
Generator Set263
16 20526316 0 0 0 0
Digital Camera701
8 20140351 0 0 0 0
Sub-Total (A)
535493
4103750
103750
103750
103750
(B) Software
Benefits Managements System (Includes AMC for 5 years)
701754
4 1
701754
4701754
701754
701754
701754
Data Digitisation
175438
6 1
175438
6 0 0 0 0
Sub-Total (B)
877193
0701754
701754
701754
701754
II Operational Expenditure( C ) Salaried / Contract Staff
Project Manager180000 1
180000
198000
217800
239580
263538
Solution / Application Architect 0 1 0 0 0 0 0
Domain Experts180000 1
180000
198000
217800
239580
263538
Database administrator 0 1 0 0 0 0 0
Support Staff120000 2
240000
264000
290400
319440
351384
Sub-Total ( C)600000
660000
726000
798600
878460
(D) Others
User Training105
26 135710526
710526
355263
355263 0
Change Management350
9 135236842
236842
118421
118421 0
Office Maintenance842
11 20
168421
1
176842
1
185684
2
194968
4
204716
8
Consumables421
1 20842
11884
21928
42974
84102358
Sub-Total (D) 271578
280421
242336
252085
214952
PricewaterhouseCoopers Page 363Confidential
Development of e-Government Strategy and Implementation PlanInception Report
9 1 8 3 7
Total (A+B+C+D)
174426
54
426971
5
395487
3
412495
7
383349
1
Priority Project III - EducationS.no.
Item Unit Cost (Cost in Birr.)
Quantity/Number of units
Year 1 (Cost in Birr.)
Year 2 (Cost in Birr.)
Year 3 (Cost in Birr.)
Year 4 (Cost in Birr.)
Year 5 (Cost in Birr.)
ICapital Expenditure
(A) Hardware
Servers2000
00 240000
04000
04000
04000
04000
0
Personal Computers1700
0 12521250
002125
002125
002125
002125
00Printers/Scanner/Photocopier
45000 63
2812500 0 0 0 0
Networking and cabling
140351 20
2807018 0 0 0 0
Generator Set2631
6 2052631
6 0 0 0 0
Digital Camera 7018 2014035
1 0 0 0 0
Sub-Total (A)88111
842525
002525
002525
002525
00(B) Software
Education Management System
7017544 1
7017544
701754
701754
701754
701754
Data Digitisation1754
386 117543
86 0 0 0 0
Sub-Total (B)87719
307017
547017
547017
547017
54
IIOperational Expenditure
( C )
Salaried / Contract Staff
Project Manager1800
00 118000
01980
002178
002395
802635
38Solution / Application Architect 0 1 0 0 0 0 0
Domain Expert1800
00 354000
05940
006534
007187
407906
14
PricewaterhouseCoopers Page 364Confidential
Development of e-Government Strategy and Implementation PlanInception Report
Database administrator 0 1 0 0 0 0 0
Support Staff1200
00 560000
06600
007260
007986
008784
60
Sub-Total ( C)13200
001452
0001597
2001756
9201932
612(D) Others
User Training1052
6 45023684
212368
4211184
2111184
211 0Change Management 3509 450
789474
789474
394737
394737 0
Office Maintenance8421
1 2016842
111768
4211856
8421949
6842047
168
Consumables 4211 20 842118842
19284
29748
41023
58
Sub-Total (D)49263
165014
7373528
6323626
1162149
527
Total (A+B+C+D)23829
4307420
9916080
0866337
2905036
393
Priority Project IV - eHealth
S.no.
Item Unit Cost (Cost in Birr.)
Quantity/Number of units
Year 1 (Cost in Birr.)
Year 2 (Cost in Birr.)
Year 3 (Cost in Birr.)
Year 4 (Cost in Birr.)
Year 5 (Cost in Birr.)
ICapital Expenditure
(A) Hardware
Servers2000
00 240000
04000
04000
04000
04000
0
Personal Computers1700
0 12521250
002125
002125
002125
002125
00Printers/Scanner/Photocopier
45000 63
2812500 0 0 0 0
Networking and cabling
140351 20
2807018 0 0 0 0
Generator Set2631
6 2052631
6 0 0 0 0
Digital Camera 7018 2014035
1 0 0 0 0
Sub-Total (A)88111
842525
002525
002525
002525
00(B) Software
Health Management System
7017544 1
7017544
701754
701754
701754
701754
Data Digitisation 1754 1 17543 0 0 0 0
PricewaterhouseCoopers Page 365Confidential
Development of e-Government Strategy and Implementation PlanInception Report
386 86
Sub-Total (B)87719
307017
547017
547017
547017
54
IIOperational Expenditure
( C )
Salaried / Contract Staff
Project Manager1800
00 118000
01980
002178
002395
802635
38Solution / Application Architect 0 1 0 0 0 0 0
Domain Expert1800
00 236000
03960
004356
004791
605270
76Database administrator 0 1 0 0 0 0 0
Support Staff1200
00 448000
05280
005808
006388
807027
68
Sub-Total ( C)10200
001122
0001234
2001357
6201493
382(D) Others
User Training1052
6 45023684
212368
4211184
2111184
211 0Change Management 3509 450
789474
789474
394737
394737 0
Office Maintenance8421
1 2016842
111768
4211856
8421949
6842047
168
Consumables 4211 20 842118842
19284
29748
41023
58
Sub-Total (D)49263
165014
7373528
6323626
1162149
527
Total (A+B+C+D)23529
4307090
9915717
0865937
9904597
163
Priority Project V- E-TradeS.no.
Item Unit Cost (Cost in Birr.)
Quantity/Number of units
Year 1 (Cost in Birr.)
Year 2 (Cost in Birr.)
Year 3 (Cost in Birr.)
Year 4 (Cost in Birr.)
Year 5 (Cost in Birr.)
I Capital Expenditure
(A) HardwareServers 2000
00 12000
002000
02000
02000
02000
0Personal Computers 1700
0 46375
0 6375 6375 6375 6375Printers/Scanner/ 4500 2 8437 0 0 0 0
PricewaterhouseCoopers Page 366Confidential
Development of e-Government Strategy and Implementation PlanInception Report
Photocopier 0 5Networking and cabling
140351 1
140351 0 0 0 0
Digital Camera 7018 1 7018 0 0 0 0Sub-Total (A) 4954
932637
52637
52637
52637
5(B) Software
Application Development of G2B Portal
3508772
13508
7723508
773508
773508
773508
77Sub-Total (B) 3508
7723508
773508
773508
773508
77II Operational
Expenditure ( C )
Salaried / Contract StaffProject Manager 1800
00 11800
001980
002178
002395
802635
38Web administrator 1200
00 11200
001320
001452
001597
201756
92Solution / Application Architect
0
1 0 0 0 0 0S/w Developer 1200
00 11200
001320
001452
001597
201756
92Support staff 1200
00 22400
002640
002904
003194
403513
84Sub-Total ( C) 6600
007260
007986
008784
609663
06(D) Others
User Training 10526 14
71053
71053
35526
35526 0
Change Management
350914
23684
23684
11842
11842 0
Sub-Total (D) 94737
94737
47368
47368 0
Total (A+B+C+D) 4759002
1197989
1223221
1303081
1343558
Priority Project VI - Employment
S.no.
Item Unit Cost (Cost in Bir
Quantity/Number of units
Year 1 (Cost in Birr.)
Year 2 (Cost in Birr.)
Year 3 (Cost in Birr.)
Year 4 (Cost in Birr.)
Year 5 (Cost in Birr.)
PricewaterhouseCoopers Page 367Confidential
Development of e-Government Strategy and Implementation PlanInception Report
r.)I Capital Expenditure (A) Hardware
Servers200000 1
200000
20000
20000
20000
20000
Personal Computers170
00 63
106250
0106250
106250
106250
106250
Printers/Scanner/Photocopier450
00 31
140625
0 0 0 0 0
Networking and cabling140351 20
280701
8 0 0 0 0
Generator Set263
16 20526316 0 0 0 0
Digital Camera701
8 20140351 0 0 0 0
Sub-Total (A)
614243
4126250
126250
126250
126250
(B) Software
Employment Management System (Includes AMC for 5 years)
526315
8 1
526315
8526316
526316
526316
526316
Data Digitisation
175438
6 1
175438
6 0 0 0 0
Sub-Total (B)
701754
4526316
526316
526316
526316
II Operational Expenditure( C ) Salaried / Contract Staff
Project Manager180000 1
180000
198000
217800
239580
263538
Solution / Application Architect 0 1 0 0 0 0 0
Domain Expert180000 2
360000
396000
435600
479160
527076
Database administrator 0 1 0 0 0 0 0
Support Staff120000 2
240000
264000
290400
319440
351384
Sub-Total ( C)780000
858000
943800
103818
0
114199
8
PricewaterhouseCoopers Page 368Confidential
Development of e-Government Strategy and Implementation PlanInception Report
(D) Others
User Training105
26 225
118421
1
118421
1592105
592105 0
Change Management350
9 225394737
394737
197368
197368 0
Office Maintenance842
11 20
168421
1
176842
1
185684
2
194968
4
204716
8
Consumables421
1 20842
11884
21928
42974
84102358
Sub-Total (D)
334736
8
343578
9
273915
8
283664
2
214952
7
5 Total (A+B+C+D)
172873
46
494635
5
433552
4
452738
8
394409
1
PricewaterhouseCoopers Page 369Confidential
Development of e-Government Strategy and Implementation PlanInception Report
Priority Project VII - Transport
S.no.
Item Unit Cost (Cost in Birr.)
Quantity/Number of units
Year 1 (Cost in Birr.)
Year 2 (Cost in Birr.)
Year 3 (Cost in Birr.)
Year 4 (Cost in Birr.)
Year 5 (Cost in Birr.)
I Capital Expenditure(A) Hardware
Servers200000 1
200000
20000
20000
20000
20000
Personal Computers170
00 63
106250
0106250
106250
106250
106250
Printers/Scanner/Photocopier450
00 31
140625
0 0 0 0 0
Networking and cabling140351 20
280701
8 0 0 0 0
Generator Set263
16 20526316 0 0 0 0
Digital Camera701
8 20140351 0 0 0 0
Sub-Total (A)
614243
4126250
126250
126250
126250
(B) Software
Transport Information & Management System (Includes AMC for 5 years)
789473
7 1
789473
7789474
789474
789474
789474
Data Digitisation (Includes AMC for 5 years)
175438
6 1
175438
6 0 0 0 0
Sub-Total (B)
964912
3789474
789474
789474
789474
II Operational Expenditure( C ) Salaried / Contract Staff
Project Manager180000 1
180000
198000
217800
239580
263538
PricewaterhouseCoopers Page 370Confidential
Development of e-Government Strategy and Implementation PlanInception Report
Solution / Application Architect 0 1 0 0 0 0 0
Domain Expert180000 4
720000
792000
871200
958320
105415
2Database administrator 0 1 0 0 0 0 0
Support Staff120000 4
480000
528000
580800
638880
702768
Sub-Total ( C)
138000
0
151800
0
166980
0
183678
0
202045
8(D) Others
User Training105
26 180947368
947368
473684
473684 0
Change Management350
9 180315789
315789
157895
157895 0
Office Maintenance842
11 20
168421
1
176842
1
185684
2
194968
4
204716
8
Consumables421
1 20842
11884
21928
42974
84102358
Sub-Total (D)
303157
9
312000
0
258126
3
267874
7
214952
7
Total (A+B+C+D)
202031
36
555372
4
516678
7
543125
1
508570
9
Priority Project VIII- Tourism
S.no.
Item Unit Cost (Cost in Birr.)
Quantity/Number of units
Year 1 (Cost in Birr.)
Year 2 (Cost in Birr.)
Year 3 (Cost in Birr.)
Year 4 (Cost in Birr.)
Year 5 (Cost in Birr.)
I Capital Expenditure(A) Hardware
Servers200000 1
200000
20000
20000
20000
20000
Personal Computers170
00 508500
00850
00850
00850
00850
00
Printers/Scanner/Photocopier450
00 251125
000 0 0 0 0
Networking and cabling140351 20
2807018 0 0 0 0
PricewaterhouseCoopers Page 371Confidential
Development of e-Government Strategy and Implementation PlanInception Report
Generator Set263
16 205263
16 0 0 0 0
Digital Camera701
8 201403
51 0 0 0 0
Sub-Total (A)5648
684105000
105000
105000
105000
(B) SoftwareTourism Management System (Includes AMC for 5 years)
526315
8 15263
158526316
526316
526316
526316
Data Digitisation350
88 13508
8 0 0 0 0
Sub-Total (B)5298
246526316
526316
526316
526316
II Operational Expenditure( C ) Salaried / Contract Staff
Project Manager180000 1
180000
198000
217800
239580
263538
Solution / Application Architect 0 1 0 0 0 0 0
Domain Expert180000 2
360000
396000
435600
479160
527076
Database administrator 0 1 0 0 0 0 0
Support Staff120000 2
240000
264000
290400
319440
351384
Editorial Team - Editor120000 1
120000
132000
145200
159720
175692
Editorial Team - Asst Editors168000 2
336000
369600
406560
447216
491938
Editorial Team - Support144000 2
288000
316800
348480
383328
421661
Sub-Total ( C)1524
000
167640
0
184404
0
202844
4
223128
8(D) Others
User Training105
26 1809473
68947368
473684
473684 0
Change Management350
9 1803157
89315789
157895
157895 0
Office Maintenance842
11 201684
211
176842
1
185684
2
194968
4
204716
8
Consumables421
1 208421
1884
21928
42974
84102358
Sub-Total (D)3031
579
312000
0
258126
3
267874
7
214952
7
PricewaterhouseCoopers Page 372Confidential
Development of e-Government Strategy and Implementation PlanInception Report
Total (A+B+C+D)15502509
542771
6
505661
9
533850
7
501213
1
Priority Project IX - TaxS.no.
Item Unit Cost (Cost in Birr.)
Quantity/Number of units
Year 1 (Cost in Birr.)
Year 2 (Cost in Birr.)
Year 3 (Cost in Birr.)
Year 4 (Cost in Birr.)
Year 5 (Cost in Birr.)
I Capital Expenditure(A) Hardware
Servers200000 2
400000
40000
40000
40000
40000
Personal Computers170
00 631062
500106250
106250
106250
106250
Printers/Scanner/Photocopier
45000 31
1406250 0 0 0 0
Networking and cabling140351 20
2807018 0 0 0 0
Generator Set263
16 205263
16 0 0 0 0
Digital Camera701
8 201403
51 0 0 0 0
Sub-Total (A)6342
434146250
146250
146250
146250
(B) Software
Tax Management System (Includes AMC for 5 years)
789473
7 17894
737789474
789474
789474
789474
Data Digitisation
245614
0 12456
140 0 0 0 0
Sub-Total (B)10350877
789474
789474
789474
789474
II Operational Expenditure( C ) Salaried / Contract Staff
Project Manager180000 1
180000
198000
217800
239580
263538
Solution / Application Architect 0 1 0 0 0 0 0
Domain Expert180000 4
720000
792000
871200
958320
105415
2
PricewaterhouseCoopers Page 373Confidential
Development of e-Government Strategy and Implementation PlanInception Report
Database administrator 0 1 0 0 0 0 0
Support Staff120000 4
480000
528000
580800
638880
702768
Sub-Total ( C)1380
000
151800
0
166980
0
183678
0
202045
8(D) Others
User Training105
26 2251184
211
118421
1592105
592105 0
Change Management350
9 2253947
37394737
197368
197368 0
Office Maintenance842
11 201684
211
176842
1
185684
2
194968
4
204716
8
Consumables421
1 208421
1884
21928
42974
84102358
Sub-Total (D)3347
368
343578
9
273915
8
283664
2
214952
7
Total (A+B+C+D)21420680
588951
3
534468
2
560914
6
510570
9
PricewaterhouseCoopers Page 374Confidential
Development of e-Government Strategy and Implementation PlanInception Report
Priority Project X- eCourt
S.no.
Item Unit Cost (Cost in Birr.)
Quantity/Number of units
Year 1 (Cost in Birr.)
Year 2 (Cost in Birr.)
Year 3 (Cost in Birr.)
Year 4 (Cost in Birr.)
Year 5 (Cost in Birr.)
I Capital Expenditure (A) Hardware
Servers200000 1
200000
20000
20000
20000
20000
Personal Computers170
00 508500
008500
08500
08500
08500
0Printers/Scanner/Photocopier
45000 25
1125000 0 0 0 0
Networking and cabling140351 20
2807018 0 0 0 0
Generator Set263
16 205263
16 0 0 0 0
Digital Camera701
8 201403
51 0 0 0 0
Sub-Total (A)5648
6841050
001050
001050
001050
00 (B) Software
eCourts System (Includes AMC for 5 years)
526315
8 15263
1585263
165263
165263
165263
16
Data Digitisation350
88 13508
8 0 0 0 0
Sub-Total (B)5298
2465263
165263
165263
165263
16
IIOperational Expenditure
( C ) Salaried / Contract Staff
Project Manager180000 1
180000
198000
217800
239580
263538
Solution / Application Architect 0 1 0 0 0 0 0
Domain Expert180000 2
360000
396000
435600
479160
527076
Database administrator 0 1 0 0 0 0 0
Support Staff120000 2
240000
264000
290400
319440
351384
Sub-Total ( C) 7800 8580 9438 1038 1141
PricewaterhouseCoopers Page 375Confidential
Development of e-Government Strategy and Implementation PlanInception Report
00 00 00 180 998(D) Others
User Training105
26 1809473
689473
684736
844736
84 0
Change Management350
9 1803157
893157
891578
951578
95 0
Office Maintenance842
11 201684
2111768
4211856
8421949
6842047
168
Consumables421
1 208421
18842
19284
29748
41023
58
Sub-Total (D)3031
5793120
0002581
2632678
7472149
527
Total (A+B+C+D)14758509
4609316
4156379
4348243
3922841
Priority Project XI - MunicipalitiesS.no.
Item Unit Cost (Cost in Birr.)
Quantity/Number of units
Year 1 (Cost in Birr.)
Year 2 (Cost in Birr.)
Year 3 (Cost in Birr.)
Year 4 (Cost in Birr.)
Year 5 (Cost in Birr.)
I Capital Expenditure(A) Hardware
Servers200000 1
200000
20000
20000
20000
20000
Personal Computers170
00 63
106250
0106250
106250
106250
106250
Printers/Scanner/Photocopier450
00 31
140625
0 0 0 0 0
Networking and cabling140351 20
280701
8 0 0 0 0
Generator Set263
16 20526316 0 0 0 0
Digital Camera701
8 20140351 0 0 0 0
Sub-Total (A)
614243
4126250
126250
126250
126250
(B) Software
PricewaterhouseCoopers Page 376Confidential
Development of e-Government Strategy and Implementation PlanInception Report
Municipalities Management System (Includes AMC for 5 years)
526315
8 1
526315
8526316
526316
526316
526316
Data Digitisation
175438
6 1
175438
6 0 0 0 0
Sub-Total (B)
701754
4526316
526316
526316
526316
II Operational Expenditure( C ) Salaried / Contract Staff
Project Manager180000 1
180000
198000
217800
239580
263538
Solution / Application Architect 0 1 0 0 0 0 0
Domain Expert180000 2
360000
396000
435600
479160
527076
Database administrator 0 1 0 0 0 0 0
Support Staff120000 6
720000
792000
871200
958320
105415
2
Sub-Total ( C)
126000
0
138600
0
152460
0
167706
0
184476
6(D) Others
User Training105
26 225
118421
1
118421
1592105
592105 0
Change Management350
9 225394737
394737
197368
197368 0
Office Maintenance842
11 20
168421
1
176842
1
185684
2
194968
4
204716
8
Consumables421
1 20842
11884
21928
42974
84102358
Sub-Total (D)
334736
8
343578
9
273915
8
283664
2
214952
7
Total (A+B+C+D)
177673
46
547435
5
491632
4
516626
8
464685
9
Priority Project XII - Passport and VisaS.no.
Item Unit Cost (Cost in
Quantity/Number of
Year 1 (Cost in Birr.
Year 2 (Cost in Birr
Year 3 (Cost in Birr
Year 4 (Cost in Birr.
Year 5 (Cost in Birr
PricewaterhouseCoopers Page 377Confidential
Development of e-Government Strategy and Implementation PlanInception Report
Birr.)
units ) .) .) ) .)
I Capital Expenditure(A) Hardware
Servers200000 1
200000
20000
20000
20000
20000
Personal Computers170
00 631062
5001062
50106250
106250
106250
Printers/Scanner/Photocopier
45000 31
1406250 0 0 0 0
Networking and cabling140351 20
2807018 0 0 0 0
Generator Set263
16 205263
16 0 0 0 0
Digital Camera701
8 201403
51 0 0 0 0
Sub-Total (A)6142
4341262
50126250
126250
126250
(B) SoftwarePassport System (Includes AMC for 5 years)
526315
8 15263
1585263
16526316
526316
526316
Data Digitisation350
88 13508
8 0 0 0 0
Sub-Total (B)5298
2465263
16526316
526316
526316
IIOperational Expenditure
( C ) Salaried / Contract Staff
Project Manager180000 1
180000
198000
217800
239580
263538
Solution / Application Architect
180000 1
180000
198000
217800
239580
263538
Domain Expert180000 2
360000
396000
435600
479160
527076
Database administrator 0 1 0 0 0 0 0
Support Staff120000 6
720000
792000
871200
958320
1054152
Sub-Total ( C)1440
0001584
000
174240
01916
6402108
304(D) Others
User Training105
26 2251184
2111184
211592105
592105 0
Change Management350
9 2253947
373947
37197368
197368 0
Office Maintenance 842 20 1684 1768 185 1949 2047
PricewaterhouseCoopers Page 378Confidential
Development of e-Government Strategy and Implementation PlanInception Report
11 211 421684
2 684 168
Consumables421
1 208421
18842
1928
429748
41023
58
Sub-Total (D)3347
3683435
789
273915
82836
6422149
527
Total (A+B+C+D)16228048
5672355
513412
45405
8484910
397
Channels I- eGovernment PortalS.no.
Item Unit Cost (Cost
in Birr.)
Quantity/
Number of
units
Year 1 (Cost
in Birr.)
Year 2 (Cost
in Birr.)
Year 3
(Cost in
Birr.)
Year 4
(Cost in
Birr.)
Year 5
(Cost in
Birr.)I Capital
Expenditure
(A) HardwareServers 28070
18 2561403
556140
456140
456140
456140
4Sub-Total (A)
5614035
561404
561404
561404
561404
(B) SoftwareDirectory Services
526316 1 526316 17544 17544 17544 17544
Integration services
350877 1 350877 17544 17544 17544 17544
Upgradation costs
175439 1 175439 17544 17544 17544 17544
Content Development
175439
1 175439 17544 17544 17544 17544Sub-Total (B)
1228070 70175 70175 70175 70175
II Operational Expenditure
( C )
Salaried / Contract StaffProject Manager
180000 1 180000
198000
217800
239580
263538
Database administrator
180000
2 36000039600
043560
047916
052707
6
PricewaterhouseCoopers Page 379Confidential
Development of e-Government Strategy and Implementation PlanInception Report
S/w Developer
120000 15
1800000
1980000
2178000
2395800
2635380
Support Staff
120000 5 600000
660000
726000
798600
878460
Sub-Total ( C)
2940000
3234000
3557400
3913140
4304454
(D) OthersUser Training for Portal Management Team of MoCIT - 20 Persons
10526
30 31578933157
934815
836556
638384
4Sub-Total (D) 315789
331579
348158
365566
383844
Total (A+B+C+D)
10097895
4197158
4537137
4910285
5319877
Channels II - Contact CenterS.no.
Item Unit Cost (Cost in
Birr.)
Quantity/
Number of units
Year 1
(Cost in
Birr.)
Year 2
(Cost in
Birr.)
Year 3
(Cost in
Birr.)
Year 4
(Cost in
Birr.)
Year 5
(Cost in
Birr.)
ICapital Expenditure
(A) Hardware
Servers2000
00 24000
00 400004000
0 40000 40000Personal Computers
17000 31
531250 53125
53125 53125 53125
Calling Equipment 1667 315208
3 2604 2604 2604 2604IVRS & Call Routing
66667 1
66667 0 0 0 0
Networking and cabling
140351 1
140351 0 0 0 0
Printers/Scanner/Photocopier
70183
21930 0 0 0 0
Site Preparation3333
3 13333
3 0 0 0 0
Sub Total (A)1245614 95729
95729 95729 95729
(B) Software
PricewaterhouseCoopers Page 380Confidential
Development of e-Government Strategy and Implementation PlanInception Report
Call Centre Software (eg Clarity) (Includes AMC for 5 years)
1578947
11578
94715789
51578
9515789
515789
5
SubTotal (B)1578
94715789
51578
9515789
515789
5
IIOperational Expenditure
( C)Salaried / Contract Staff
Project Manager1800
002
360000
396000
435600
479160
527076
HR&Admin Manager
578947
21157
89512736
841401
05315411
5816952
74Call Center Shift Manager
385965
2 771930
849123
934035
1027439
1130182
Call Center Team Leader
315789 10
3157895
3473684
3821053
4203158
4623474
Call Centre Executives
231579 80
18526316
20378947
22416842
24658526
27124379
Support Staff4736
84 41894
73720842
112292
63225218
9527740
84
Sub Total ( C )25868772
28455649
31301214
34431335
37874469
(D) Other Costs
Lease Cost8000
0 18000
0 840008820
0 92610 97241
User Training1052
6 313289
4734539
53626
6438079
839983
8Office Maintenance
84211 1
84211 88421
92842 97484
102358
Consumables (for 3 shifts) 4211 3
12632 13263
13926 14623 15354
Sub Total (D)5057
8953107
95576
3358551
561479
0Total (A+B+C+D)
29199123
29240352
32112471
35270474
38742883
Channels III- Mobile GatewayS.no.
Item Unit Cost (Cost
in Birr.
)
Quantity/
Number of units
Year 1
(Cost in
Birr.)
Year 2
(Cost in
Birr.)
Year 3
(Cost in
Birr.)
Year 4
(Cost in
Birr.)
Year 5
(Cost in
Birr.)
ICapital Expenditure
(A) Hardware
PricewaterhouseCoopers Page 381Confidential
Development of e-Government Strategy and Implementation PlanInception Report
Servers2807
018 11403
5091543
8602947
372947
372947
37
Sub Total (A)1403509
1543860
294737
294737
294737
(B) Software
WAP Server 3577 1003577
193577
23577
23577
23577
2
Content Converter 3577 1003577
193577
23577
23577
23577
2Application Development
SubTotal (B)7154
397154
47154
47154
47154
4
IIOperational Expenditure
( C )
Salaried / Contract Staff
Project Manager1800
00 11800
001980
002178
002395
802635
38
IT Architect1800
001
180000
198000
217800
239580
263538
Support Staff/Content Developer
120000
6 720000
792000
871200
958320
1054152
DB Administrator1800
001
180000
198000
217800
239580
263538
S/w Developer1200
006
720000
792000
871200
958320
1054152
Sub Total ( C )1980000
2178000
2395800
2635380
2898918
(D) Other CostsTraining and Awareness of the mobile mananmenegt team of MoCIT
10526 30
315789
331579
348158
365566
383844
Change Management of the mobile mananmenegt team of MoCIT 3509 30
105263
110526
116053
121855
127948
Sub-Total (D)4210
534421
054642
114874
215117
92Total (A+B+C+D)
4520000
4235509
3226291
3489082
3776991
Channels IV- Common Service CenterS.no
Item Unit
Quantity/
Year 1
Year 2
Year 3
Year 4
Year 5
PricewaterhouseCoopers Page 382Confidential
Development of e-Government Strategy and Implementation PlanInception Report
. Cost (Cost in Birr.)
Number of units
(Cost in Birr.)
(Cost in Birr.)
(Cost in Birr.)
(Cost in Birr.)
(Cost in Birr.)
ICapital Expenditure
(A) HardwarePersonal Computers
17000 6400
108800000
10880000
10880000
10880000
10880000
Printers/Scanner/Photocopier
45000 6400
288000000 0 0 0 0
Biometric Device (per operator) 667 3200
2133333 0 0 0 0
Smart Card Reader (per operator)
1000 3200
3200000 0 0 0 0
Digital Camera (per operator)
7018 3200
22456140 0 0 0 0
Sub Total (A)42458
947410880
00010880000
10880000
10880000
(B) Software
Billing Software357
7 5 1788622456
142245
61422456
1422456
14Desktop Audit Software
3577 5 17886
2245614
2245614
2245614
2245614
Sub Total (B) 3577244912
284491
22844912
2844912
28
IIOperational Expenditure
( C )
Salaried / Contract Staff
Project Manager180000 1
180000
198000
217800
239580
263538
HR & Admin Manager
578947 1
578947
636842
700526
770579
847637
Finance Manager578947 1
578947
636842
700526
770579
847637
IT Admin526316 1
526316
578947
636842
700526
770579
Site Inspection and Audit Manager
385965 1
385965
424561
467018
513719
565091
CSC Front Staff 42105 3200
134736842
148210526
16303157
917933
473719726
8211
Support Staff 120000 800
96000000
105600000
11616000
012777
600014055
3600
PricewaterhouseCoopers Page 383Confidential
Development of e-Government Strategy and Implementation PlanInception Report
Sub Total ( C)23298
701825628
5719
28191429
131010
572034111
6292(D) Other Costs
Lease Cost - Per CSC office
53333 800
42666667
44800000
47040000
49392000
51861600
User Training - Per CSc operator
3509 3200
11228070
3368421
3368421
3368421
3368421
Office Maintenance - Per CSC office
4211 800
3368421
3536842
3713684
3899368
4094337
Consumables - Per Office
4211 800
3368421
3536842
3713684
3899368
4094337
Sub Total (D)60631
57955242
10557835789
60559158
63418695
Total (A+B+C+D)71824
384232689
9053
35512130
938603
610641990
6215
PricewaterhouseCoopers Page 384Confidential
Development of e-Government Strategy and Implementation PlanInception Report
Enablers- Capacity Building
S.no.
Item Unit Cost (Cost in
Birr.)
Quantity/Number of units
Year 1 (Cost in Birr.)
Year 2 (Cost in Birr.)
Year 3 (Cost in Birr.)
Year 4 (Cost in Birr.)
Year 5 (Cost in Birr.)
ICapital Expenditure
(A) Hardware
Servers2000
00 11000
001100
002100
02100
02100
0
Personal Computers1700
0 1602720
0002720
002720
002720
002720
00Printers/Scanner/Photocopier
45000 20
900000 0 0 0 0
Networking and cabling
140351 20
2807018 0 0 0 0
Generator Set2631
6 205263
16 0 0 0 0
Digital Camera 7018 201403
51 0 0 0 0
Sub-Total (A)7193
6843820
002930
002930
002930
00(B) Software
CBT - Training content development
1578947 1
1578947
52632
52632
52632
52632
Central Knowledge Management Portal
526316 1
526316
52632
52632
52632
52632
SubTotal (B)2105263
105263
105263
105263
105263
IIOperational Expenditure
( C )
Salaried / Contract StaffBusiness Process Re-engineering Expert
771930 1
771930
849123
934035
1027439
1130182
PPP Expert 771930 1
771930
849123
934035
1027439
1130182
Advanced Technologies Expert
771930 1
771930
849123
934035
1027439
1130182
Software Development Expert
771930 1
771930
849123
934035
1027439
1130182
Trainers 350877 40
Sub Total ( C ) 3087 3396 3736 4109 4520
PricewaterhouseCoopers Page 385Confidential
Development of e-Government Strategy and Implementation PlanInception Report
719 491 140 754 730
(D)Training and Other CostsLeadership Orientation Programme
133333 4
533333
560000
588000
617400
648270
Project Management 3000 41200
01260
01323
01389
21458
6Vendor Management 1667 4 6667 7000 7350 7718 8103SLA Design and Monitoring 1667 4 6667 7000 7350 7718 8103Customer orientation and support 667 4 2667 2800 2940 3087 3241Office Maintenance - Per Training Insititute
84211 20
1684211
1768421
1856842
1949684
2047168
Consumables - Per Training Insititute 4211 20
84211
88421
92842
97484
102358
Sub Total (D)2329754
2446242
2568554
2696982
2831831
Total (A+B+C+D)14716421
6329996
6702958
7204999
7750824
Enablers - Marketing and Awareness
S.no.
Item Unit Cost (Cost in Birr.)
Quantity/Number of units
Year 1 (Cost in Birr.)
Year 2 (Cost in Birr.)
Year 3 (Cost in Birr.)
Year 4 (Cost in Birr.)
Year 5 (Cost in Birr.)
(A)Salaried / Contract StaffMarketing Director
771930
17719
308491
239340
351027
4391130
182
Manager - PR4736
841
473684
521053
573158
630474
693521
Marketing/PR Professional
385965
41543
8601698
2461868
0702054
8772260
365Cost of Hiring of a Marketing and PR Agency
385965
1 385965
424561
467018
513719
565091
Sub Total (A )2789474
3068421
3375263
3712789
4084068
(B) Other Costs
Direct Mailers2668
0 123201
563361
643529
723706
213891
52
PricewaterhouseCoopers Page 386Confidential
Development of e-Government Strategy and Implementation PlanInception Report
Billboards3200
0 123840
004032
004233
604445
284667
54Advertisements in Print Media
33696 12
404352
424570
445798
468088
491492
Radio Advertisements
56400 12
676800
710640
746172
783481
822655
Television Advertisements
99000 12
1188000
1247400
1309770
1375259
1444021
Online Marketing6668
0 128001
568401
648821
729262
819725
95
Events6668
0 128001
568401
648821
729262
819725
95Branded Gifts / Paraphanelia
33340 12
400076
420080
441084
463138
486295
Content Development
200000 12
2400000
2520000
2646000
2778300
2917215
Sub Total (B)7373696
7742381
8129500
8535975
8962774
Total (A+B)10163170
10810802
11504763
12248764
13046842
Standards & PoliciesS.no.
Item Unit Cost (Cost in Birr.)
Quantity/Number of units
Year 1 (Cost in Birr.)
Year 2 (Cost in Birr.)
Year 3 (Cost in Birr.)
Year 4 (Cost in Birr.)
Year 5 (Cost in Birr.)
(A)Salaried / Contract StaffCIO 8771
93 187719
396491
210614
0411675
441284
298Data & Process Expert
771930 1
771930
849123
934035
1027439
1130182
Technology Expert
771930 1
771930
849123
934035
1027439
1130182
Service Delivery Expert
771930 1
771930
849123
934035
1027439
1130182
Security Expert 771930 1
771930
849123
934035
1027439
1130182
Legal Expert 771930 1
771930
849123
934035
1027439
1130182
Sub-Total ( C) 4736842
5210526
5731579
6304737
6935211
(B) OthersTraining and Awareness of Standard and Poilicies
10526
20 210526
221053
232105
243711
255896
PricewaterhouseCoopers Page 387Confidential
Development of e-Government Strategy and Implementation PlanInception Report
departmentChange Management of Standard and Poilicies department 3509 20 70175 73684 77368 81237
85299
Consumables 4211 1 4211 4421 4642 4874 5118
Sub-Total (D)28491
229915
831411
632982
23463
13
5 Total (A+B)50217
5455096
8460456
9566345
587281
523
Ethiopia - Core projects - EA
S.no.
Item Unit Cost (Cost in
Birr.)
Quantity/Number of units
Year 1 (Cost in Birr.)
Year 2 (Cost in Birr.)
Year 3 (Cost in Birr.)
Year 4 (Cost in Birr.)
Year 5 (Cost in Birr.)
I Capital Expenditure(A) Hardware
Servers2000
00 22000
002200
004200
04200
04200
0
Sub-Total (A)2000
002200
004200
04200
04200
0(B) Software
EA Tool3500
00 12150
002150
002150
002150
002150
00Central Knowledge Management Portal
526316 1
526316 0 0 0 0
SubTotal (B)7413
162150
002150
002150
002150
00
IIEA development Expenditure
( C ) Consultant cost
EA Architect 771930 1
771930 0 0 0 0
Team members 771930 3
2315789 0 0 0 0
Trainers 350877 3
1052632
Sub Total ( C )4140351 0 0 0 0
(D)Training and Other CostsSub Total (D) 0 0 0 0 0
PricewaterhouseCoopers Page 388Confidential
Development of e-Government Strategy and Implementation PlanInception Report
Total (A+B+C+D)5081
6674350
002570
002570
002570
00
Ethiopia - Core projects - NIAF
S.no.
Item Unit Cost (Cost in
Birr.)
Quantity/Number of units
Year 1 (Cost in Birr.)
Year 2 (Cost in Birr.)
Year 3 (Cost in Birr.)
Year 4 (Cost in Birr.)
Year 5 (Cost in Birr.)
I Capital Expenditure(A) Hardware
Servers + all related H/w4000
000 14000
000 0 0 0 0
Sub-Total (A)4000
000 0 0 0 0(B) Software
Software (all softwares)4200
000 14200
000
SubTotal (B)4200000 0 0 0 0
IISolution development Cost & Maintenance
( C )
Solution development Cost 25262500 1
25262500 0 0 0 0
Maintenance & support500,000
500,000
500000
500000
Sub Total ( C )25262500
500000
500000
500000
500000
(D)Training and Other CostsTraining cost 2000
00 12000
00 0 0 0 0Consumables
4211 301263
16 0 0 0 0
Sub Total (D)3263
16 0 0 0 0
Total (A+B+C+D)33788816
500000
500000
500000
500000
Ethiopia - Core projects - NSEB
S.no.
Item Unit Cost (Cost in
Birr.
Quantity/Number of units
Year 1 (Cost in Birr.
Year 2 (Cost
Year 3 (Cost
Year 4 (Cost
Year 5 (Cost
PricewaterhouseCoopers Page 389Confidential
Development of e-Government Strategy and Implementation PlanInception Report
) ) in Birr.)
in Birr.)
in Birr.)
in Birr.)
I Capital Expenditure(A) Hardware
Servers + all related H/w3000
000 13000
000 0 0 0 0
Sub-Total (A)3000
000 0 0 0 0(B) Software
Software (all softwares)7450
000 17450
000
SubTotal (B)7450000 0 0 0 0
IISolution development Cost & Maintenance
( C )
Consultancy & Solution development Cost
9460000 1
9460000 0 0 0 0
Infrastructure set up5590
00 15590
00 0 0 0 0
Sub Total ( C )10019000 0 0 0 0
(D) Training and Other CostsTraining cost 1 0 0 0 0 0Consumables
4211 301263
16 0 0 0 0
Sub Total (D)1263
16 0 0 0 0
Total (A+B+C+D)20595316 0 0 0 0
Ethiopia - Core projects - NPG
S.no.
Item Unit Cost (Cost
in Birr.
)
Quantity/Number of units
Year 1 (Cost in Birr.)
Year 2 (Cost in Birr.)
Year 3 (Cost in Birr.)
Year 4 (Cost in Birr.)
Year 5 (Cost in Birr.)
I Capital Expenditure(A) Hardware
Servers + all related H/w10750000 1
10750000 0 0 0 0
Sub-Total (A)10750000 0 0 0 0
(B) Software
PricewaterhouseCoopers Page 390Confidential
Development of e-Government Strategy and Implementation PlanInception Report
Software (all softwares)6450
000 16450
000
SubTotal (B)6450000 0 0 0 0
IISolution development Cost & Maintenance
( C )
Consultancy & Solution development Cost
10750000 1
10750000 0 0 0 0
Maintenance & support 0 0 0 0
Sub Total ( C )10750000 0 0 0 0
(D) Training and Other CostsTraining cost 1 0 0 0 0 0Consumables
4211 301263
16 0 0 0 0
Sub Total (D)1263
16 0 0 0 0
Total (A+B+C+D)28076316 0 0 0 0
PricewaterhouseCoopers Page 391Confidential
Development of e-Government Strategy and Implementation PlanInception Report
Ethiopia - Core projects - NDS
S.no.
Item Unit Cost (Cost
in Birr.
)
Quantity/Number of units
Year 1 (Cost in Birr.)
Year 2 (Cost in Birr.)
Year 3 (Cost in Birr.)
Year 4 (Cost in Birr.)
Year 5 (Cost in Birr.)
I Capital Expenditure(A) Hardware
Servers + all related H/w8600
000 18600
000 0 0 0 0
Sub-Total (A)8600
000 0 0 0 0(B) Software
Software (all softwares)6450
000 16450
000
SubTotal (B)6450000 0 0 0 0
IISolution development Cost & Maintenance
( C )
Consultancy & Solution development Cost
21500000 1
21500000 0 0 0 0
Maintenance & support 0 0 0 0
Sub Total ( C )21500000 0 0 0 0
Consumables4211 30
126316 0 0 0 0
Sub Total (D)1263
16 0 0 0 0
Total (A+B+C+D)36676316 0 0 0 0
Common Applications - HRMS
S.no.
Item Unit Cost (Cost in Birr
.)
Quantity/Number of units
Year 1 (Cost in Birr.)
Year 2 (Cost in Birr.)
Year 3 (Cost in Birr.)
Year 4 (Cost in Birr.)
Year 5 (Cost in Birr.)
I Capital Expenditure(A) Hardware
PricewaterhouseCoopers Page 392Confidential
Development of e-Government Strategy and Implementation PlanInception Report
Servers + all related H/w
280701
8 12807
018 0 0 0 0
Sub-Total (A)2807
018 0 0 0 0(B) Software
Software (all softwares)
701754
4 17017
544
SubTotal (B)7017
544 0 0 0 0
IISolution development Cost & Maintenance
( C )
Consultancy & Solution development Cost
438596
5 14385
965 0 0 0 0
Infrastructure set up559000 1
559000 0 0 0 0
Sub Total ( C )4944965 0 0 0 0
(D)Training and Other CostsTraining cost
1001052
632
105263
2
105263
2
105263
2
105263
2Consumables 421
1 1004210
53421053
421053
421053
421053
Sub Total (D)1473684
147368
4
147368
4
147368
4
147368
4
Total (A+B+C+D)16243211
147368
4
147368
4
147368
4
147368
4
Common Applications - e-Office
S.no.
Item Unit Cost (Cost in Birr
.)
Quantity/Number of units
Year 1 (Cost in Birr.)
Year 2 (Cost in Birr.)
Year 3 (Cost in Birr.)
Year 4 (Cost in Birr.)
Year 5 (Cost in Birr.)
I Capital Expenditure(A) Hardware
Servers + all related H/w2807
018 12807
018 0 0 0 0
Sub-Total (A)2807
018 0 0 0 0
PricewaterhouseCoopers Page 393Confidential
Development of e-Government Strategy and Implementation PlanInception Report
(B) Software
Software (all softwares)7017
544 17017
544
SubTotal (B)7017
544 0 0 0 0
IISolution development Cost & Maintenance
( C )
Consultancy & Solution development Cost
4385965 1
4385965 0 0 0 0
Infrastructure set up5590
00 15590
00 0 0 0 0
Sub Total ( C )4944965 0 0 0 0
(D) Training and Other CostsTraining cost
202105
26210526
210526
210526
210526
Consumables4211 10
42105
42105
42105
42105
42105
Sub Total (D)2526
32252632
252632
252632
252632
Total (A+B+C+D)15022158
252632
252632
252632
252632
Common Applications - e-Procurement
S.no.
Item Unit Cost (Cost in Birr
.)
Quantity/Number of units
Year 1 (Cost in Birr.)
Year 2 (Cost in Birr.)
Year 3 (Cost in Birr.)
Year 4 (Cost in Birr.)
Year 5 (Cost in Birr.)
I Capital Expenditure(A) Hardware
Servers + all related H/w2807
018 12807
018 0 0 0 0
Sub-Total (A)2807
018 0 0 0 0(B) Software
Software (all softwares)7017
544 17017
544
SubTotal (B)7017
544 0 0 0 0
IISolution development Cost & Maintenance
( C )
Consultancy & Solution development Cost
4385965 1
4385965 0 0 0 0
Infrastructure set up 5590 1 5590 0 0 0 0
PricewaterhouseCoopers Page 394Confidential
Development of e-Government Strategy and Implementation PlanInception Report
00 00
Sub Total ( C )4944965 0 0 0 0
(D) Training and Other CostsTraining cost
202105
26210526
210526
210526
210526
Consumables4211 10
42105
42105
42105
42105
42105
Sub Total (D)2526
32252632
252632
252632
252632
Total (A+B+C+D)15022158
252632
252632
252632
252632
PricewaterhouseCoopers Page 395Confidential
Development of e-Government Strategy and Implementation PlanInception Report
Common Applications - Financial Management and Information System
S.no.
Item Unit Cost
(Cost in Birr.)
Quantity/Number of units
Year 1 (Cost in Birr.)
Year 2 (Cost in Birr.)
Year 3 (Cost in Birr.)
Year 4 (Cost in Birr.)
Year 5 (Cost in Birr.)
I Capital Expenditure(A) Hardware
Upgrdation Costs -Servers + all related H/w 842105 1 842105 0 0 0 0Sub-Total (A) 842105 0 0 0 0
(B) SoftwareSoftware (all softwares) 2105263 1 2105263SubTotal (B) 2105263 0 0 0 0
IISolution development Cost & Maintenance
( C )
Consultancy & Solution development Cost 1315789 1 1315789 0 0 0 0Infrastructure set up 55900 1 55900 0 0 0 0Sub Total ( C ) 1371689 0 0 0 0
(D)
Training and Other CostsTraining cost 0 0 0 0 0 0Consumables 4211 0 0 0 0 0 0Sub Total (D) 0 0 0 0 0
Total (A+B+C+D)
4,319,057.89 0 0 0 0
Ethiopia - Common Applications - Email Management and Information System
S.no.
Item Unit Cost (Cost in Birr.)
Quantity/Number of units
Year 1 (Cost in Birr.)
Year 2 (Cost in Birr.)
Year 3 (Cost in Birr.)
Year 4 (Cost in Birr.)
Year 5 (Cost in Birr.)
I Capital Expenditure
PricewaterhouseCoopers Page 396Confidential
Development of e-Government Strategy and Implementation PlanInception Report
(A) Hardware
Servers + all related H/w 2807018 1
280701
8 0 0 0 0
Sub-Total (A)
280701
8 0 0 0 0(B) Software
Software (all softwares) 7017544 1
701754
4
SubTotal (B)
701754
4 0 0 0 0
IISolution development Cost & Maintenance
( C )
Consultancy & Solution development Cost
4385965 1
438596
5 0 0 0 0
Infrastructure set up 559000 1559000 0 0 0 0
Sub Total ( C )
494496
5 0 0 0 0(D) Training and Other Costs
Training cost 0 0 0 0 0 0Consumables 4211 0 0 0 0 0 0Sub Total (D) 0 0 0 0 0
Total (A+B+C+D)
147695
26 0 0 0 0
ITSG Salary of manpower
S.no.
Item Unit Cost (Cost in
Birr.)
Quantity/Number of units
Year 1 (Cost in Birr.)
Year 2 (Cost in Birr.)
Year 3 (Cost in Birr.)
Year 4 (Cost in Birr.)
Year 5 (Cost in Birr.)
PricewaterhouseCoopers Page 397Confidential
Development of e-Government Strategy and Implementation PlanInception Report
Manpower costs
1
Solution / application architects
180,000.
00 4
360,000.00
792,000.00
871,200.00
958,320.00
1,054,152.00
2
Database Administrators
180,000.
00 6
540,000.00
1,188,000.00
1,306,800.00
1,437,480.00
1,581,228.00
3
Software Developers
120,000.
00 8
480,000.00
1,056,000.00
1,161,600.00
1,277,760.00
1,405,536.00
4
Web Administrator
120,000.
00 2
120,000.00
264,000.00
290,400.00
319,440.00
351,384.00
Total
1,500,000.00
3,300,000.00
3,630,000
.00
3,993,000.00
4,392,300.00
PMO Staff CostsItem Unit
Cost (Cost
in Birr.)
Quantity/Number of units
Year 1 (Cost in Birr.)
Year 2 (Cost in Birr.)
Year 3 (Cost in Birr.)
Year 4 (Cost in Birr.)
Year 5 (Cost in Birr.)
Manpower costs
Team Leaders
180,000.00 7
1,260,000.00
1,386,000.00
1,524,600.00
1,677,060.00
1,844,766.00
Team Members
120,000.00 10
600,000.00
1,320,000.00
1,452,000.00
1,597,200.00
1,756,920.00
Total
1,860,000.0
0
2,706,000.0
0
2,976,600.0
0
3,274,260.
00
3,601,686.0
0
PricewaterhouseCoopers Page 398Confidential
Development of e-Government Strategy and Implementation PlanInception Report
www.pwc.com
PricewaterhouseCoopers Page 399Confidential
© 2010 PricewaterhouseCoopers. All rights reserved. “PricewaterhouseCoopers”, a registered trademark, refers to PricewaterhouseCoopers Private Limited (a limited company in India) or, as the context requires, other member firms of PricewaterhouseCoopers International Limited, each of which is a separate and independent legal entity.