Upload
your-homes-newcastle
View
217
Download
2
Embed Size (px)
DESCRIPTION
Â
Citation preview
1
Delivery Plan2010/11
2 3
Contents
Page
Foreword from Steve Murphy, Chair of Your Homes Newcastle 4
1. Introduction 6
2. What we do
• Mission statement 7
• Strategic objectives 7
• Core Values 8
• Business strategy 8
• Links with Newcastle City Council 8
• Governance 10
3. How we do it (resources, fi nance and performance)
• Our staff 13
• Workforce planning 13
• Our services 13
• Business and fi nancial planning 14
• Managing performance 15
• Performance targets 16
• New housing regulation 16
• Financial management 17
• Service Improvement Programme 18
4. Key Themes
• Customer service 23
• Value for money 24
• Partnership working 25
• Equality and diversity 26
• Risk Management 28
• Organisational Development 28
• Information technology 29
• Environmental Sustainability 30
Page
5. Looking back: what we achieved in 2009/10
• Top 20 Targets 2009/10 31
• Strategic objective achievements 34
• Investment and Modern Homes 39
6. Looking forward: what we aim to achieve in 2010/11
• Our Top 20 targets for 2010/11 41
• How the Top 20 targets were set 42
• Wider Management Team targets 2010/11 43
• Investment and Modern Homes 52
• Future business 52
Appendices
Appendix 1:
Business and fi nancial
planning diagram 54
Appendix 2:
Your Homes Newcastle Service
Plan 2010/11 56
Glossary 126
Appendix 3:
Housing Revenue Account/Your
Homes Newcastle Budgets for
2009/10 and 2010/11 129
Appendix 4:
Modern Homes Programme
2010/11 131
Rent 这是有关您的租金账户的信息。如果您需要此信息的普通话版本或其它语言版本,请致电 0191 278 8633 索取。
Repairs 这是有关要求维修您的住房的信息。如果您需要此信息的普通话版本或其它语言版本,请致电 0191 278 8633 索取。
Right to Buy 这是有关租客有权购买他们的市政房屋的信息。如果您需要此信息的普通话版本或其它语言版本,请致
电 0191 278 8633 索取。 Tenancy 这是有关您作为纽卡斯尔市政租客所需要承担的责任的信息。如果您需要此信息的普通话版本或其它语
言版本,请致电 0191 278 8633 索取。 YCH 这是有关我们的出租服务的信息。如果您需要此信息的普通话版本或其它语言版本,请致电 0191 278
8633 索取。 YHN general / Homes + People
这是有关代表纽卡斯尔市政府(Newcastle City Council)负责管理市政房屋的 Your Homes Newcastle(您的纽卡斯尔住房)组织的信息,内容解释了我们是如何运作。如果您需要此信息的普通话版本或其
它语言版本,请致电 0191 278 8633 索取。
- Chinese Simplifi ed普通话/国语Rent 這是關於您的租金賬戶的信息。如果您需要此信息的廣東話版本或其它語言版本,請致電 0191 278
8633 索取。 Repairs 這是關於如何要求維修您住房的信息。如果您需要此信息的廣東話版本或其它語言版本,請致電 0191
278 8633 索取。 Right to Buy 這是關於租客有權購買他們的市政房屋的信息。如果您需要此信息的廣東話版本或其它語言版本,請致
電 0191 278 8633 索取。 Tenancy 這是關於您作為紐卡素市政府租客所需要承擔的責任的信息。如果您需要此信息的廣東話版本或其它語
言版本,請致電 0191 278 8633 索取。 YCH 這是關於我們的出租服務的信息。如果您需要此信息的廣東話版本或其它語言版本,請致電 0191 278
8633 索取。 YHN general / Homes + People
這是關於 Your Homes Newcastle(您的紐卡素住房)機構的信息,內容解釋了我們代表紐卡素市政府
(Newcastle City Council)負責管理市政房屋以及如何運作。如果您需要此信息的廣東話版本或其它
語言版本,請致電 0191 278 8633 索取。
- Chinese Traditional廣東話/粵語
0191 278 8633 †dvb K‡i Avcwb GKwU wjwLZ Abyev‡`i Rb¨ ej‡Z cv‡ib| Newcastle Furniture service
GB Z_¨ nj BDi †nvg wbDK¨vmj- KvDw݇ji dvwb©Pvi mvwf©m mg‡Ü hviv †Ubv›U‡`i Ni evox mvRv‡Z mvnv‡h¨i Rb¨ dvwb©Pvi mieivn K‡i| GB Z_¨ hw` <evsjvq> A_ev Ab¨ †Kvb fvlvq cÖ‡qvRb nq Zvn‡j GB bv¤̂v‡i †dvb Ki“b- 0191 278 8633
Rent GB Z_¨ nj Avcbvi †i›U GKvD›U (fvovi wnmve wbKvm) m¤̂‡Ü| GB Z_¨ hw` <evsjvq> A_ev Ab¨ †Kvb fvlvq cÖ‡qvRb nq Zvn‡j GB bv¤^v‡i †dvb Ki“b- 0191 278 8633
Repairs GB Z_¨ nj Avcbvi Ni evox †givgZ Ki‡Z PvIqv m¤^‡Ü|GB Z_¨ hw` <evsjvq> A_ev Ab¨ †Kvb fvlvq cÖ‡qvRb nq Zvn‡j GB bv¤^v‡i †dvb Ki“b- 0191 278 8633
Right to Buy GB Z_¨ nj †Ubv›U‡`i KvDw݇ji Ni evox †Kbvi AwaKvi m¤̂‡Ü| GB Z_¨ hw` <evsjvq> A_ev Ab¨ †Kvb fvlvq cÖ‡qvRb nq Zvn‡j GB bv¤^v‡i †dvb Ki“b- 0191 278 8633
Tenancy GB Z_¨ nj wbDKvm¨vj KvDw݇ji †Ubv›U wnmv‡e Avcbvi `vq `vwqZ¡ m¤̂‡Ü| GB Z_¨ hw` <evsjvq> A_ev Ab¨ †Kvb fvlvq cÖ‡qvRb nq Zvn‡j GB bv¤^v‡i †dvb Ki“b- 0191 278 8633
YCH GB Z_¨ nj Avgv‡`i †jwUs mvwf©m( fvov welqK) m¤̂‡Ü| GB Z_¨ hw` <evsjvq> A_ev Ab¨ †Kvb fvlvq cÖ‡qvRb nq Zvn‡j GB bv¤^v‡i †dvb Ki“b- 0191 278 8633
YHN general/Homes + People
GB Z_¨ nj BDi †nvgm wbDK¨vmj mg‡Ü| Ges Avgiv wKfv‡e `vwqZ¡ cvjb KiwQ †m mg‡Ü| BDi †nvgm wbDK¨vmj, wbDK¨vmj wmwU KvDw݇ji c‡¶ KvDw݇ji Ni evox e¨e¯’vcbvi `vwqZ¡cÖvß| GB Z_¨ hw` <evsjvq> A_ev Ab¨ †Kvb fvlvq cÖ‡qvRb nq Zvn‡j GB bv¤^v‡i †dvb Ki“b- 0191 278 8633
- Bengali
YHN general / Homes + People
اسل ، نيوك شهردارى از سوى اين سازمان. عملكرد آن است و » شما در نیوکاسل هاى خانه«درباره سازمان اين اطالعات مسئوليت اداره خانه هاى دولتى را به عهده دارد. در صورت نياز به اين اطالعات به زبان فارسى يا زبان هاى ديگر با شماره تلفن
٠١٩١٢٧٨٨۶٣٣ تماس بگيريد.
- Farsi
téléphoner au 0191 278 8633 pour obtenir une traduction écrite.
Newcastle Furniture service
Ces informations concernent le service « mobilier » de Your Homes Newcastle, qui fournit du mobilier aux locataires pour les aider à s’installer dans leur logement. Si vous avez besoin de ces informations en français ou dans une autre langue, téléphonez au : 0191 278 8633.
Rent Ces informations concernent votre loyer. Si vous avez besoin de ces informations en français ou dans une autre langue, téléphonez au : 0191 278 8633.
Repairs Ces informations concernent les demandes de travaux pour votre logement. Si vous avez besoin de ces informations en français ou dans une autre langue, téléphonez au : 0191 278 8633.
Right to Buy Ces informations concernent les droits des locataires relatifs à l’acquisition de leur logement social. Si vous avez besoin de ces informations en français ou dans une autre langue, téléphonez au : 0191 278 8633.
Tenancy Ces informations concernent vos responsabilités en tant que locataire de la municipalité de Newcastle. Si vous avez besoin de ces informations en français ou dans une autre langue, téléphonez au : 0191 278 8633.
YCH Ces informations concernent notre service de location. Si vous avez besoin de ces informations en français ou dans une autre langue, téléphonez au : 0191 278 8633.
YHN general / Homes + People
Ces informations concernent Your Homes Newcastle : qui est chargé de gérer les logements sociaux au nom de la municipalité de Newcastle et comment nous procédons. Si vous avez besoin de ces informations en français ou dans une autre langue, téléphonez au : 0191 278 8633.
Français - FrenchRepairs
óäbmóØòìíäb‚@ñòìó䆋ÙØbš@üi@ðîŒaí‚a†@ðmóïäüš@ói@pòŠbió@óäbîŠbïäaŒ@ãó÷@NîŠbïäaŒ@ãó÷@m‹ Šòì@óÜ@çbmŒóyŠó ó÷@ói@óäb
@ðäüÑïÝm@òŠbàˆ@ói@óîóè@óÙî†@ðÙ—äbàŒ@Šóè@bî@ñ†ŠíØ@ðäbàŒ0191 278 8633ç‹i@ñ‡äòí—q@N
Right to Buy òŠb’@ñaŠü’@ðäbØòìíäb‚@î‹Ø@üi@çbåï“å–‹Ø@Àbà@ói@pòŠbió@óäbîŠbïäaŒ@ãó÷@N@ói@óäbîŠbïäaŒ@ãó÷@m‹ Šòì@óÜ@çbmŒóyŠó ó÷
@óîóè@óÙî†@ðÙ—äbàŒ@Šóè@bî@ñ†ŠíØ@ðäbàŒ@ðäüÑïÝm@òŠbàˆ@ói0191 278 8633ç‹i@ñ‡äòí—q@N
Tenancyóîa‡Ý—bØüïä@óÜ@Šb’@ñaŠü’@ðÙ—åï“å–‹Ø@íØòì@òí—÷@ðäbØóïmóîb‹qŠói@ói@pòŠbió@óäbîŠbïäaŒ@ãó÷@N@m‹ Šòì@óÜ@çbmŒóyŠó ó÷
@ðäüÑïÝm@òŠbàˆ@ói@óîóè@óÙî†@ðÙ—äbàŒ@Šóè@bî@ñ†ŠíØ@ðäbàŒ@ói@óäbîŠbïäaŒ@ãó÷0191 278 8633q@ç‹i@ñ‡äòí—N
YCHóîóá—÷@ð–‹Ø@ðäbØómóà‚@ ói@pòŠbió@ óäbîŠbïäaŒ@ ãó÷@ N@Šóè@ bî@ñ†ŠíØ@ðäbàŒ@ ói@ óäbîŠbïäaŒ@ ãó÷@m‹ Šòì@ óÜ@çbmŒóyŠó ó÷
@ðäüÑïÝm@òŠbàˆ@ói@óîóè@óÙî†@ðÙ—äbàŒ0191 278 8633ç‹i@ñ‡äòí—q@N
YHN general / Homes + People
@ói@pòŠbió@óäbîŠbïäaŒ@ãó÷Your Homes Newcastle@òìóÝ—bØüïä@ñŠb’@ñaŠü’@çóîý@óÜ@óØ@óîóØó䆋؊bØ@ðmóïäüš@ì@
pbÙi@ðmóîaŠóiòí–Šói@Šb’@ñaŠü’@ðäbØòìíäb‚@óØ@òìaŠ‡—q@ñòìó÷@ðØŠó÷@N@ðäbàŒ@ói@óäbîŠbïäaŒ@ãó÷@m‹ Šòì@óÜ@çbmŒóyŠó ó÷
@ðäüÑïÝm@òŠbàˆ@ói@óîóè@óÙî†@ðÙ—äbàŒ@Šóè@bî@ñ†ŠíØ0191 278 8633i@ñ‡äòí—q@ç‹N
- Kurdish<português> ou noutra língua, queira ligar para o 0191 278 8633.
Rent Esta informação refere-se à sua renda. Se precisar desta informação em <português> ou noutra língua, queira ligar para o 0191 278 8633.
Repairs Esta informação refere-se ao pedido de reparações em sua casa. Se precisar desta informação em <português> ou noutra língua, queira ligar para o 0191 278 8633.
Right to Buy Esta informação refere-se ao direito que os inquilinos têm de comprar a sua habitação social. Se precisar desta informação em <português> ou noutra língua, queira ligar para o 0191 278 8633.
Tenancy Esta informação refere-se às suas responsabilidades como inquilino social em Newcastle. Se precisar desta informação em <português> ou noutra língua, queira ligar para o 0191 278 8633.
YCH Esta informação refere-se ao serviço de arrendamento. Se precisar desta informação em <português> ou noutra língua, queira ligar para o 0191 278 8633.
YHN general / Homes + People
Esta informação refere-se à Your Homes Newcastle, a organização responsável pela gestão da habitação social em nome do Município de Newcastle, e a nossa situação actual. Se precisar desta informação em <português> ou noutra língua, queira ligar para o 0191 278 8633.
Português - Portuguese
idioma, llame al 0191 278 8633. Repairs Ésta es información sobre cómo pedir que se realicen reparaciones en su casa. Si necesita esta
información en español o en otro idioma, llame al 0191 278 8633. Right to Buy Ésta es información sobre los derechos de los inquilinos a comprar su vivienda municipal. Si necesita
esta información en español o en otro idioma, llame al 0191 278 8633. Tenancy Ésta es información sobre sus responsabilidades como inquilino municipal de Newcastle. Si necesita
esta información en español o en otro idioma, llame al 0191 278 8633. YCH Ésta es información sobre nuestro servicio de adjudicación. Si necesita esta información en español
o en otro idioma, llame al 0191 278 8633. YHN general / Homes + People
Ésta es información sobre Your Homes de Newcastle, que es la responsable de gestionar las viviendas municipales en nombre del Ayuntamiento de Newcastle, y sobre nuestra manera de hacerlo. Si necesita esta información en español o en otro idioma, llame al 0191 278 8633.
Español - Spanish
переводчика или Вы можете обратиться за предоставлением письменного перевода по тел. 0191 278 8633 .
Newcastle Furniture service
Информация о службе по обеспечению мебелью Your Homes Newcastle, которая поставляет мебель квартиросъемщикам с целью их обоснования в домах. Если Вы нуждаетесь в этой информации <на русском> или другом языке звоните по тел. 0191 278 8633.
Rent Информация о Вашем арендном счете. Если Вы нуждаетесь в этой информации <на русском> или другом языке звоните по тел. 0191 278 8633.
Repairs Информация о предоставлении помощи с ремонтными работами в Вашем доме. Если Вы нуждаетесь в этой информации <на русском> или другом языке звоните по тел. 0191 278 8633.
Right to Buy Информация о правах квартиросъемщиков на приобретение их муниципального жилья. Если Вы нуждаетесь в этой информации <на русском> или другом языке звоните по тел. 0191 278 8633.
Tenancy Информация о Ваших обязательствах в качестве муниципального квартиросъемщика в г. Ньюкасле. Если Вы нуждаетесь в этой информации <на русском> или другом языке звоните по тел. 0191 278 8633.
YCH Информация о наших услугах сдачи жилья в наем. Если Вы нуждаетесь в этой информации <на русском> или другом языке звоните по тел. 0191 278 8633.
YHN general / Homes + People
Информация о Your Homes Newcastle, которая отвечает за управление делами муниципального жилья от имени Муниципалитета г. Ньюкасла и об общем состоянии дел.
- Russian
This information is about Your Homes Newcastle, who are responsible for managing council homes on behalf of Newcastle City Council, and how we are doing. If you need this in your language or a different language phone 0191 278 8633. This information is also available in easy read, large print, Braille and audio tape. We can also arrange for you to see a British Sign Language interpreter.
4 5
Foreword
This is my second foreword as Chair since my appointment in September 2008. I have very much enjoyed working with the YHN Board and with staff across the organisation so far, and I am looking forward to 2010/11 when we will be continuing to ensure that we provide and develop excellent services.
Since 2004, YHN has made great strides towards achieving its mission to become the best housing provider in the north east. This progress was given a great boost in 2008 through the Audit Commission inspection in which YHN was awarded three star status, both in terms of current service provision and prospects for the future. The publishing of our Business Plan for 2009/14, called ‘Stepping Up: Improving on Excellence in Challenging Times’ in September 2009, following full consultation, will help give us further impetus and direction for the next four years.
2009/10 has been another busy year, and there have been many achievements we are proud of. We have introduced a set of core values, which will be at the heart of what we do in the future, and will influence the way we work and behave. Six of our services have been awarded ‘Customer Service Excellence’ (CSE) accreditation. CSE has replaced Charter Mark as the government’s main customer service award, so this achievement reflects our ongoing drive towards providing excellent services. During 2010/11 we plan to submit a CSE application for the whole organisation to build on our achievements so far, and to gain greater recognition for the level of service we believe we provide.
We have received recognition during 2009/10 through various other awards and accreditations. To mention just a few, we received a ‘Better Health at Work’ award in December 2009 from
NHS Public Health NE, and ‘Employer of the Year’, from Newcastle City Learning. We were also finalists in three categories of the prestigious UK Housing Awards run by the Chartered Institute of Housing, which was more than any other housing organisation.
In September 2009 we were delighted to hear that our application to be included in the Tenant Services Authority’s (TSA) ‘Service Offer’ pilot scheme had been successful. Since then, we have been working with the TSA to develop a scheme offering additional services to all city council sheltered housing tenants. This should help in preparing us for the new inspection regime due to be introduced by the TSA for social housing landlords, which we will be preparing for during the early part of 2010.
We have also been busy this year in developing services that we provide around the ‘worklessness’ agenda. We increasingly recognise the role we have to play in supporting tenants of the city council and other customers, and in providing a wider range of services to promote wellbeing. In September 2009 we published our ‘Skills to Work’ strategy, aimed at helping our customers to get back into work and training. This has led, for example, to the creation of a new Employability Co-ordinator post and work with Newcastle Futures to introduce ‘surgeries’ in housing offices.
Last year in my foreword I was able to outline our first home building initiative. During 2009 we have established Leazes Homes as a charitable subsidiary to
build new homes for sale and rent. We have built 34 bungalows on three sites across Newcastle, and have started a further 65 affordable homes for rent and 45 homes for private sale on a number of sites, in an ambitious programme of building which includes both family accommodation and a range of properties for vulnerable people who need support. This work on new development is in addition to all of the Modern Homes work we continue to carry out to council properties, refurbishing and improving homes to ensure that people have high quality places to live in Newcastle.
These are just a few of our achievements during 2009 and some of the things that will be happening during 2010, which will be another challenging and exciting year for YHN. I know that through the efforts of many people we will continue to embrace challenges and strive to be the best housing provider in the North East. I would like to thank my colleagues on the Board and Committees, our tenants and leaseholders, our partners at the city council, all YHN staff, and others that work with us for their help during 2009/10. I know this support will continue in 2010/11, and I very much look forward to reporting further progress to you in the future.
by Steve Murphy, Chair of Your Homes Newcastle
Steve Murphy, Chair of Your Homes Newcastle
I am very pleased to introduce Your Homes Newcastle’s Delivery Plan for 2010/11. It provides information about our services and how we deliver them. It also sets out our relationship with Newcastle City Council, and identifies what we are aiming to achieve during the next year.
6 7
Introduction1
2What we do
Your Homes Newcastle (YHN) is an Arms Length Management Organisation (ALMO). We were set up in 2004 to manage council properties, to improve housing in order to meet the Government’s Decent Homes standard, and to provide various other services for Newcastle City Council (NCC). Currently we manage around 29,300 tenanted and 1450 leasehold homes.
The services that we provide and
the way that we do this are covered
by a management agreement with
the council. The current agreement
runs until 2014 when it is due to be
reviewed. Through this agreement, we
have to produce an annual delivery plan
which explains how we provide services.
The delivery plan is an opportunity for
us to say what we have achieved over
the previous year, what we intend to
achieve during the current year, and
how we contribute to meeting our own
strategic objectives and those of the city
council.
This year’s delivery plan tells you about:
• What our strategic objectives and core values are;
• How we work with the city council and others;
• What services we provide and how these are paid for;
• How we manage performance;
• Key themes that guide the work we do;
• What we achieved during 2009/10; and
• What we intend to achieve during 2010/11.
The delivery plan also includes our
service plan for 2010/11 as an appendix.
The service plan gives more detailed
information about what our individual
teams and services aim to achieve
during the coming year, and how
they contribute towards our strategic
objectives.
The delivery plan has been produced
every year since 2004. It is a continually
evolving document. Last year we
changed the appearance, content and
structure of the plan. This year we
have included information about our
business plan, ‘Stepping Up: Improving
on Excellence in Challenging Times’, and
about our new core values. There is also
a section about how we have started
to address the new Tenant Services
Authority (TSA) requirements for
managing housing. We hope that the
new delivery plan clearly shows what
YHN is all about.
We think that the three star
rating we received after our Audit
Commission inspection in April
2008 showed that we have come
a long way. Since then we have
continued developing and improving
the services we provide in order to
achieve our mission.
Strategic Objectives
We will achieve our mission by
investing in:
• Support and care to communities
• Three star excellent services
• A quality workforce
• Refurbishing and building homes
These are our four strategic
objectives.
These objectives were revised
in January 2007 to give focus to
our work. They determine how
priorities for YHN are set, and
how performance throughout the
organisation is measured. All of
our performance targets contribute
to achieving one or more of the
strategic objectives.
Our mission statement is:Your Homes Newcastle intends to be the best housing provider in the North East.
8 9
Core Values
In November 2009, following
consultation with staff, Board and
customers, our new core values were
agreed. They are:
Accountability – acting openly and
taking responsibility
Integrity – acting fairly and honestly
Passion – working positively with
enthusiasm
Respect – treating everyone with care
and professionalism
Forward thinking – proactively
seeking improvements and solutions
Our core values are at the heart of
the business, and are the principles
and standards that infl uence the way
we work and behave. They make a
difference by giving us a sense of pride
and belonging at work, and show we
care and are committed to people and
the work we do.
During 2010/11 we will be making sure
that all our staff understand these
values and that they become central to
what we do.
Business Strategy
During 2009 we produced our fi rst
business strategy entitled ‘Stepping up:
Improving on Excellence in Challenging
Times’. The strategy gives a high level
overview of the direction we will take
for the next fi ve years, how we plan to
achieve our strategic objectives, and
what this will mean for our customers.
The business strategy sets out our
aspirations, and provides a framework
for all of our other key documents
such as the annual delivery and service
plans. The strategy explains where we
want to be in 2014, and identifi es key
actions to achieve each of our four
strategic objectives. The delivery and
service plans say what we are doing
on an annual basis towards achieving
our longer term aims and objectives.
The ‘looking back’ section in this year’s
delivery plan is more specifi c about
what we have achieved in relation
to business strategy actions, and the
‘looking forward’ section says how we
will be developing milestone targets
to help us keep on track in achieving
longer term strategic goals.
Links with Newcastle City Council
NCC set up YHN as a limited company,
and the council is our one and only
shareholder. Our management
agreement with NCC explains the
services that we set up to provide on
behalf of the council and also describes
the working relationship between us.
The agreement says that NCC and YHN:
‘intend to work within a spirit of
partnership in order to continuously
improve the services and the way in
which they are delivered’.
This spirit of partnership underpins the
work that we do and the services we
provide. Ways in which this happens are
explained further in section four of this
plan.
NCC contributes to the Newcastle
Partnership, which brings together
at a strategic level, a range of public,
private, community and voluntary sector
groups in order to promote effective
working and improved services. The
Sustainable Community Strategy (SCS)
sets out the partnership’s vision, aims
and priority objectives for Newcastle.
The Local Area Agreement (LAA)
identifi es improvement targets and
priorities agreed with the Government
to help the partnership to achieve its
aims and objectives over a three year
period (2008-11).
Some of our work is featured in
the SCS, and we have an important
contribution to make towards meeting
the challenges within all of the themes
identifi ed, which are:
• better economy (strengthening the economy);
• better health (wellbeing, health and independence);
• better environment (managing environmental impact);
• better places to live (creating and sustaining quality places to live);
• safe, strong communities (creating safe, inclusive, cohesive and empowered communities); and
• more for young people (improving outcomes for children and young people)
We contribute directly to some of the
targets identifi ed within the LAA,
particularly the following within the
theme of ‘creating and sustaining
quality places to live’:
• offering the homes that people want;
• delivering more affordable homes;
• delivering quality homes; and
• providing homes for older people, people with disabilities, vulnerable people and people with support needs
NCC has developed a number of other strategies and plans which contribute towards the SCS, such as the Regeneration Strategy and the Housing Strategy. The 15 year housing strategy, ‘Homes for a sustainable future’ sets out a clear vision of what the council wants to achieve before 2021.
Accountability • Integrity • Passion • Respect • Fo
rwar
d th
inki
ng •A bilitytyt • Integritytyt
•Passion•Respectctc•Fo
rwrwrnk
in
g •
YHN:Our CoreValues
10 11
It recognises the important role we have in offering high quality services to tenants and leaseholders, and contributing to creating a good quality of life for residents.
Our staff work in close co-operation with staff from the council and other partner agencies to help meet the aims and objectives of these strategies and plans. This relationship operates at a number of different levels, and continues to develop. The diagram on page 12 shows the relationship between the different plans and strategies that
have an impact on the work of YHN.
Governance
YHN is a company limited by guarantee
and has legal and statutory duties under
the Companies Act. We have a Company
Secretary who is responsible for making
sure that our business is conducted
in accordance with the law and for
arranging the governance of our
business. Our governance framework
has been developed around the
Good Governance Standard for Public
Services. The standard comprises six
core principles of good governance, one
of which is to promote values for the
whole organisation and to demonstrate
good governance through conduct and
behaviour. We have adopted codes of
conduct for staff and board members
which facilitate the promotion,
communication and embedding of
proper standards of behaviour across
the organisation.
Corporate governance arrangements
are set out in the Governance
Handbook, a copy of which is issued
to all board members and which is
available on the organisation’s website.
The Board and its Committees
The Board has overall responsibility for
the management of the organisation
and its primary responsibility is to set
the organisation’s overall strategy and
to oversee the effective implementation
of that strategy. There is a risk
management strategy in place that
underlies its key decisions.
The Board meets every six weeks and
a forward plan of matters that are
to be considered is in place and is
reviewed regularly. Meetings are open
to the public except when personal or
confidential matters are discussed. The
Chair meets regularly with the Chief
Executive and other informal meetings
and discussions take place with board
members as appropriate.
In 2009, the Board reviewed its
committee structure following which
four committees were set. These are:
Audit; Customer and Service Delivery;
Finance and Resources; Performance;
and Remuneration. Terms of Reference
for these committees are on our website
and copies can be obtained from the
Company Administrator. Each of the
three groups of board members is
represented on the committees.
During 2009 the Board also set up a
Time Limited Committee to review the
previous Area Board structure. The
review concluded that area boards
should be replaced by neighbourhood
themed meetings. A programme of
meetings has been implemented to
meet the needs of local communities
and to complement existing mechanisms
for involvement.
Board Membership
The Board has a membership of 19
made up of:
• A Chair;
• Six tenant members;
• Six independent members; and
• Six city council nominees
The Chair is appointed after open
recruitment and the appointment is
approved by board and NCC. The Chair
is appointed for a three year term.
Board members can serve a maximum of
three terms (a maximum of nine years)
and there is a rotational requirement
for tenant and independent board
members to stand down each year at
the Annual General Meeting.
Tenant members, two from each of
the three areas across the city, are
nominated by other tenants. One
of the tenant positions can be held
by a leaseholder, though at present
there are no leaseholders on the
board. Following interview, tenant
appointments are recommended to the
board for approval. Where there is more
than one successful candidate for an
area, a ballot of tenants in that area will
be held.
Independent members are selected for
the additional skills, knowledge and
experience they bring to the Board and
are appointed by the Board following
open recruitment. Appointment of
new independent members is
confirmed by NCC; the Board approves
re-appointments.
NCC nominees are appointed each
year by the city council at their Annual
General Meeting.
There is an induction programme for
new board members and a Board
Learning and Development Plan that
is reviewed and updated each year to
meet the needs of board members.
The Executive Management Team
The Executive Management Team is
the Chief Executive; Assistant Chief
Executive and Director of Business;
Director of Finance and Resources; and
Director of Tenancy Services.
The day to day running of the
organisation is delegated to the
Chief Executive and his Executive
Management Team through our Scheme
of Delegations.
The Chief Executive and Executive
Management Team are not members of
the YHN Board.
12 13
Newcastle City Council Corporate Plan 2009/12
This sets out the council’s strategic direction.
Housing Strategy This City Council strategy shows how housing of all tenures will contribute to the
Newcastle Plan and the Regeneration Strategy.
YHN Business Strategy 2009/14This strategy gives a high
level overview of our strategic direction for the next fi ve years.
YHN Delivery PlanThis plan sets out our objectives,
targets and achievements.
Service PlanThis contains team action plans
developed to achieve our four strategic objectives. It is included as an appendix
to the Delivery Plan.
YHN Service Improvement Programme This is where Prince 2 methodology is used to project manage service
improvements are. This is also included in the Delivery Plan.
Tenant Participation Strategy
This strategy sets out how NCC and YHN will work together
to put tenant and leaseholder
involvement at the heart of our housing
services.
YHN Corporate Equality Plan
This covers the six strands of equality
and diversity.
Procurement PlanThis details how we will review Service Level Agreements
(SLA’s) and our own services and how we will buy work, goods and services to ensure value for
money.
YHN Medium Term PlanThis is our key fi nancial plan – growth
and effi ciencies are set out here.
Modern Homes ProgrammeThis details the work we will carry out to improve and maintain Council housing.
Local Area Agreement This is a three year
action plan to deliver the Sustainable Community
Strategy.
Regeneration Strategy This City Council
strategy ties together all regeneration plans across
the city.
3Resources, fi nance and performanceSustainable Community Strategy
This sets out a long term vision for the City, and sets priorities to achieve this.
Our staff
We are a large organisation, with an
establishment of over 900 posts. About
300 of our staff are based at our head
offi ce, YHN House. The rest work from
a number of locations across the city
such as community housing offi ces,
the Your Choice Homes (YCH) Property
Shop, concierge lodges and sheltered
housing schemes.
Workforce planning
So that we can accurately anticipate
our future staffi ng needs it is essential
that we keep abreast of our workforce
profi le which includes numbers of staff
employed, turnover, demographics
and skill levels. We also need to have a
fi rm understanding of the challenges
and issues we are likely to face over
the coming years through workforce
planning. Doing so enables us to
effectively plan ahead and ensure that
we have the right people, in the right
jobs at the right time.
Workforce planning is a key theme
within the People Strategy we began
developing during 2009/10. We have
started to formalise workforce planning
and as part of our action plan we will
be including this in our annual business
and fi nancial planning process (see
below).
Our services
To provide services, we are split
into three directorates and a Chief
Executive’s Offi ce. The directorates are:
• Business
• Finance and Resources
• Tenancy Services
The Business Directorate is responsible
for delivering the Modern Homes
Programme, managing assets, staff
development, customer involvement
and business strategy.
Finance and Resources is made up
mostly of central teams which provide
support to the organisation, including
fi nance, human resources, information
technology and administration.
Tenancy Services is made up of customer
facing teams. This includes Housing
Management, Property Maintenance,
Customer Service, Care and Support
Services and Citywide Services.
Our Chief Executive’s Offi ce has
responsibility for equality and
diversity issues, communications, and
governance.
Further information about all of our
staff, and more detailed information
about the directorates and the services
that they provide are available on our
website, and in the service plan.
15
Managing performance
It is essential that we manage and
report on our performance to ensure
that we are continuing to provide
excellent services. We need to be able
to demonstrate this to our customers,
including the city council. We also
need to show that we are continually
trying to improve and that we are
working towards achieving our strategic
objectives.
We have a performance management
framework in place which ensures that
our strategic objectives are threaded
though all levels of the organisation
to frontline staff. It is designed to
translate vision into action and to
demonstrate the extent to which
this occurs. The framework is used to
drive improvement in services and is
regularly improved to reflect customer
focus, tenant priorities and local
circumstances.
The principles behind managing
performance are that we:
• Ensure all targets are SMART (Specific, Measurable, Achievable, Realistic, Time-bound) and are outcome focused where possible;
• Benchmark our performance with others and look at trends to help us understand the issues;
• Produce ‘traffic light’ reports so that stakeholders can get a snapshot picture of our performance;
• Keep all stakeholders involved and informed about performance issues;
• Focus on action for recovery in areas of under-performance; and
• Operate a consistent approach to supervision, workplans and appraisals.
During 2009/10 we have continued to
improve the ways in which we gather
and report on performance information.
Monitoring performance is aligned
with targets and actions in the service
plan, which has increasingly become
embedded across the organisation
as a basis for directing action and
resources. There is also a strengthening
link between monitoring performance,
appraisals, and workplan meetings
within teams. Targets in the service plan
are cascaded through the organisation
so that all staff feel part of the process
of achieving the overall strategic aims
of the organisation.
We will continue to develop the
way we ‘mainstream’ performance
monitoring and management across
the organisation during 2010/11 so that
all staff feel involved in this process,
and have clear targets and actions for
which they are responsible, or to which
they contribute. Through our new
Performance Committee, in operation
since September 2009, we are also
further developing the ways in which
performance information is scrutinised
and poor performance addressed, in
order to continually improve services for
our customers.
Business and financial planning
We use a business and financial planning process to prepare our delivery and service plans, to help plan our budgets, and to help produce learning and development plans for our staff. We introduced this in 2005 to help join up service planning and financial planning, which had previously been separate exercises. We also wanted customers, managers, staff and partners to all have a say in what goes into the plans.
The process involves consultation throughout the year with managers, customers, staff and stakeholders. We ask managers and staff about resources, performance, customer service, equalities and other important issues. During 2009/10 for the first time we took the opportunity to ask about worklessness and financial inclusion, and how we can contribute as an organisation in these areas. We ask tenants and leaseholders about what
issues they think are important, and how we should be spending their rent and service charges. We then produce draft plans based on the comments, suggestions and ideas that have been put forward. These draft plans are then circulated for further discussion before the final version of the delivery plan is put forward to the YHN Board and the city council for agreement.
Performance targets and actions that are agreed through the business and financial planning process become the basis for managing and reporting performance for the following year.
Further information about business and financial planning is available on our website. This includes a diagram showing the cycle of events which make up the planning process, which normally runs from May until the following March. This diagram is attached as an appendix to the delivery plan for information (Appendix 1).
14
16 17
Performance targets
Our last delivery plan explained a
change in the way we set and monitor
targets. From April 2008, following
consultation, we introduced a new set
of ‘Top 20’ and ‘Wider Management
Team’ targets, which are explained
below. The intention of this was to
provide more relevant information
to our board and customers about
‘business critical’, targets, and to ensure
that senior managers concentrate
attention on ‘headline’ targets for
each service. We are continuing with
this approach as we believe that this
combines the best aspects of our
previous arrangements with a more
focussed approach that is easier for
customers, board members, the city
council and staff to understand. We
now have the following performance
targets:
• Our ‘Top 20’ targets. These are 20 key targets that provide an overview of how we are doing across all of our services. Performance against these targets is reported to our Performance Committee on a quarterly basis, and is reported to NCC and to our customers. If any targets are not hit, an action plan is developed to ensure an improvement in performance.
• Our ‘Wider Management Team’ targets. This is an additional set of 34 targets identified by managers to represent overall service performance and key service actions. Performance against these and the ‘Top 20’ targets is discussed by the team at regular meetings, and any action required where targets are not being met is agreed. Wider Management Team is made up of all senior managers within YHN.
• Team Targets. This is a larger set of targets for each team within YHN which forms our service plan, attached to this delivery plan (Appendix 2). These targets are used as a basis for monitoring performance within teams, and link with team workplans, staff supervision, and annual staff appraisals.
More information about performance
against these targets for 2009/10, and
targets set for 2010/11 is provided in
sections five and six of this plan, and in
the introduction to the service plan.
New housing regulation
During 2009/10 the Tenant Services
Authority (TSA) announced their
new regulatory framework for social
landlords. The framework is based on
a set of national and local standards
across a range of service areas.
In July 2009 we submitted an
application to be part of a TSA local
standard pilot scheme. Our application
was around providing a ‘service offer’
to sheltered housing tenants, offering
a range of new services to help current
and future sheltered housing tenants.
We were successful with our
application, and have had discussions
with the TSA, who are enthusiastic
about our pilot scheme, which runs
from April to October 2010. After that
the pilot will be evaluated, and if it
has been successful we will consider
possibilities to extend it to other
vulnerable customers.
During early 2010 we started
considering the implications of
proposed new regulation, which could
have a big impact on the way we
currently measure our performance,
and on all our service standards.
During 2010/11 we will find out more
about what we need to do, and will
make whatever changes we need to in
order to meet new requirements. We
believe that the positive links we have
established with the TSA so far, and our
pilot scheme, will stand us in good stead
for future changes.
Financial management
The services that we provide are paid
for through a management fee from
the Housing Revenue Account (HRA),
which we manage on behalf of the
city council. The HRA and YHN budgets
set out what services will be provided
during each year and how they will be
funded. The budgets are monitored
and reported to Finance and Resources
Committee and to the city council
at Section 151 meetings. These are
meetings held every month to discuss
the YHN Management Fee and other
important financial issues. Significant
amendments to budgets are highlighted
for approval by Finance and Resources
Committee and the Board. The Board
receives quarterly updates on the latest
budget and Medium Term Plan position.
18 19
Regular meetings are held between
finance staff and service managers
to discuss budgets and spending, so
that any cost increases or new areas
of spending can be built into budget
planning and efficiencies can be
recorded. A finance manager is part
of the business and financial planning
steering group, and financial planning
links closely with business planning.
Our HRA and YHN budgets for 2009/10
and the budget set for 2010/11 are
attached to the Delivery Plan (Appendix
3). Further information about these
budgets, including details of variations
between the two years, was included in
a report to the YHN Board in January
2010 entitled ‘YHN and HRA Budgets
and Medium Term Plan update’. YHN
Board reports are available on our
website.
We produce a medium term plan which
identifies projected budgets for a five
year period. The medium term plan is
reported to our Finance and Resources
Committee on a quarterly basis so that
any projected deficit or surplus can be
discussed and required action agreed.
Service Improvement Programme: ‘Improving on Excellence’
To assist us in delivering our Business
Strategy and to enable us to continue to
deliver three star excellent services, we
have developed a Service Improvement
Programme named ‘Improving on
Excellence’. This is based on the ‘Prince
2’ project management method.
The aim of the service improvement
programme is to ‘get better at what we
do’. In order to do this, the programme
ensures that a five year timetable of
service reviews is carried out and all
actions from strategies are delivered.
This allows us to ensure that we
continuously improve our services.
The Programme is made up of three
Project Executive Boards each of which
consists of a number of projects. Each
Project Executive Board is headed
by a Director of Service. The project
executives report monthly on progress
to a Programme Board which is chaired
by the Chief Executive.
Projects are normally led by a service
manager and include a small group
of staff from across YHN and other
partnering organisations, often chosen
for their specialist knowledge in a
particular field. Project leaders are
expected to provide regular update
reports on their ‘key deliverables and
milestones’ (specific tasks) they are
working on.
We employ an external specialist with
industry knowledge and experience to
fulfil the role of Programme Assurance.
This role forms part of Programme
Board and is there to provide advice
and guidance on best practice and to
assist us in ensuring our key deliverables
are ‘fit for purpose’.
The current make up of the Programme
is shown on pages 20 and 21. The
programme has recently been reviewed
and was re-launched in January 2010 to
complement our key business priorities.
The Programme has Project Executive
Boards that reflect our three
directorates. These are:
• Tenancy Services;
• Finance and Resources; and
• Business Development
20 21
ProgrammeAssurance
ProgrammeAssurance
Programme Manager
Programme Manager
Programme Board
Programme Board
ProgrammeOffi ce
ProgrammeOffi ce
Tenancy ServicesNeil Scott
Tenancy ServicesNeil Scott
TS Service Reviews
COMMUNITY CAREALARM SERVICE
Alyson Bell
INFORMATION TECHOLOGYGeof Ellingham
LEASEHOLDJeanette Johnson
HOUSING, ANTI-SOCIAL BEHAVIOUR AND
ENFORCEMENT TEAMNick Dodgeon
FINANCE STRATEGYLisa Forrest
ASSET MANAGEMENTDavid Langhorne
FR Service Reviews
BD Service Reviews
TS Strategies
FR Strategies
BD Strategies
Finance and ResourcesRoss Atkinson
Finance and ResourcesRoss Atkinson
Business DevelopmentSheila Breslin
Business DevelopmentSheila Breslin
ASYLUM SEEKERS UNITVin Totten
INCOME MANAGEMENTAnne Crute
TENANT AND LEASEHOLDERLouise Dixon
HOUSING MANAGEMENTAllison Hodgson
PEOPLES STRATEGYSandra Archbold/Sandie Dickson
RISK MANAGEMENTKeith Mcdonald
CUSTOMER SERVICEWilf Keilty
EFFICIENCYLisa Forrest
COMMUNICATIONSDaniel McGuinness
YOUNG PERSONSKim McMaster
INFORMATION TECHOLOGYGeof Ellingham
CORPORATE EQUALITIES PLANSimone Doyle
REPAIRS AND MAINTENANCEIan Gallagher
PROCUREMENTChris Nicholson
ORGANISATIONAL DEVELOPMENT
Sandra Archbold
SKILLS TO WORKMartyn Burn
HUMAN RESOURCESSandie Dickson
SERVICE REVIEWS
SERVICE REVIEWSACTION PLAN
STRATEGIES
FINANCIAL INCLUSIONSuzanne Halliwell
LETTINGSJohn Urwin
ENVIRONMENTAL SUSTAINABILITY
Ian Gallagher
CONCIERGEHelen Garbutt
KEY
Service Improvement Programme Structure
22 23
4Key Themes
Customer service
To achieve our mission to be the best
housing provider in the North East, we
need to consistently provide excellent
customer services. We are committed to
increasing opportunities to access our
services in ways that suit the diverse
requirements of our customers and
that equip us for the future whilst
maintaining high levels of customer
care.
During 2008 we produced our Customer
Service Strategy called ‘Every Customer
Matters’. The strategy sets out our
vision for the future development of
customer services for the following
three years and outlines improvements
that we need to make to ensure
the ongoing delivery of three star
excellent services. The strategy was
developed around customers’ needs
and aspirations, gathered through
consultation with them and our own
staff, and additionally takes account
of the rigorous Customer Service
Excellence (CSE) standard.
Our vision for customer services, as
explained in ‘Every Customer Matters’, is
that:
“Our customers will be able to access
our services at whatever time they
want in a way that best suits their
needs. Every time a customer comes
in contact with our organisation they
will receive excellent and consistent
customer services, delivered by a
quality workforce that is enabled by
technology. Your Homes Newcastle
will be recognised as a responsive,
accessible, inclusive and above all an
organisation that delivers excellent
customer services”
During 2010/11 our priorities are:
• “To get better at what we do” through implementation of products and services in accordance with the YHN Service Improvement Programme plans and timescales;
• To produce and publish a YHN Customer Service Charter to reflect our commitment to delivering services in keeping with the CSE Standard and YHN’s core values of Accountability, Integrity, Passion, Respect and Forward Thinking;
• To maintain our existing CSE and Charter Mark recognitions for YHN services and achieve an organisation wide CSE recognition for YHN; and
• To continue to positively engage with our complaints and compliments processes in order to “get things right and right any wrongs”.
Performance against our standards
and plans is regularly monitored and
reported to a number of key forums
including the YHN Service Improvement
Programme Board, YHN Performance
Committee, YHN Customer and
Service Delivery Committee and where
necessary the main YHN Board.
24 25
Value for money
Value for money is a central
requirement for any successful
organisation. Efficiency savings can be
reinvested to provide better services
for customers, provide more choice,
and ensure that needs and priorities
are met. Efficiency is not about service
reductions, but about doing more for
the same or less by raising productivity,
increasing effectiveness and getting
better value for money.
Our approach and key processes for
achieving value for money are set out
in our YHN Efficiency Strategy. They
include:-
• Benchmarking ourselves against others through the HouseMark Performance Improvement Club to identify inefficiency;
• Making sure all staff are involved in identifying savings and efficiencies through our business and financial planning process, Team Brief process and Wider Management Team meetings;
• Undertaking regular analysis of all our suppliers to identify ways to reduce costs;
• Carrying out regular service reviews of internal services;
• Reviewing all Service Level Agreements with NCC; and
• Consulting with our customers to ensure efficiency savings are reinvested in services that they want.
During 2009/10 we have:
• Generated capital savings of over £7,680,000 on our Modern Homes Investment Programme;
• Achieved savings of over £814,000 from procurements; and
• Improved processes and working practices resulting in savings of over £370,000.
Partnership working
Partnership working is essential in
providing our services and deciding
our strategic priorities. We have close
ties with NCC for reasons explained
in section two of this plan, and this
relationship is formalised in a number
of ways:
• Newcastle Partnership: our Chief Executive contributes to the Local Strategic Partnership, working with NCC and other local agencies to deliver the Sustainable Community Strategy and the Local Area Agreement;
• The Management Agreement: this is the formal agreement that sets out the context within which the Council has delegated its responsibilities to us;
• The Delivery Plan: this contains some of the key interfaces between the two organisations, including delivery plan monitoring, officer liaison meetings, and Section 151 reporting meetings about our management of the HRA on behalf of the council; and
• Service Level Agreements: these explain the services that we purchase from the council and the regular monitoring and liaison required to manage the delivery of these services.
At an operational level we also
work closely with NCC staff across all
Directorates to assist with providing
‘joined-up’ services to customers.
As well as links with NCC, we also work
in partnership with a large number
of other organisations at a local and
citywide level.
Key partners include:
• Newcastle Tenants’ Federation – which represents 85 affiliated tenants’ groups across the city;
• Northumbria Police – working together at a local and strategic level;
• The Voluntary Sector – a wide range of contacts, supporting communities, providing advice, support and other services to local people; and
• Specialist partners such as the Groundwork Trust who are an environmental regeneration charity.
We are also part of a wide range of
diverse and extensive partnerships,
including the city’s housing, health
and community safety partnerships,
to name but three. These reflect the
size and importance of council housing
within the city and the scale of the
interdependencies that exist between
social housing and so many other
aspects of communities’ lives.
26 27
Equality and diversity
We recognise that the people who
live in council homes have diverse
backgrounds, circumstances and needs.
They are all ages, disabled and non-
disabled, of different races and ethnic
backgrounds, heterosexual, lesbian, gay
and bisexual, and from faith and non-
faith backgrounds.
Our Equality Policy and Corporate
Equality Plan (CEP) outlines our vision,
aims and targets and how we are
meeting our responsibilities:
• As an employer;
• Providing services to our customers;
• Working with other organisations;
• Involving communities; and
• As a procurer of services and contracts.
Our commitment to equality goes
beyond our legal duties and our policy
outlines the need to address equality
of opportunity through avoiding direct
and indirect discrimination, making
sure that all areas of YHN are involved
in meeting this objective. To make this
happen, responsibility for equality and
diversity rests with our board, and our
Chief Executive acts as our corporate
champion in ensuring proper systems
are in place to put our policy into
practice.
We need to make sure that treating
everyone fairly and justly and with
respect becomes a natural part of the
way we do things. This involves staff at
all levels thinking about whether we are
being fair and respectful to different
types of people during normal work
activities. This includes when we are:
• Delivering existing services;
• Developing new services;
• Reviewing existing policies and procedures;
• Arranging consultation events and questionnaires;
• Procuring goods and services;
• Undertaking service reviews; and
• Dealing with comments and complaints.
To ensure this happens equality and
diversity targets are built into our
delivery plan and actions which will
support our equality and diversity
objectives are included in individual
service plans.
To help us include equality and diversity
into everything we do, we carry out
Equality Impact and Needs Assessments
(EINAs) against all areas of our business
including existing policies, procedures
and services with regard to race, gender,
disability, faith, sexual orientation
and age to identify where there
may be unmet needs or potentially
discriminatory outcomes.
When conducting EINAs we look at all
the information we have on individual
services to see if:
• We need to make any special arrangements for different groups of people, such as disabled people, or older people;
• Anything we do disadvantages these groups; and
• We can identify any unmet needs for example providing hearing loops and signers, for people with sensory disability at consultation events.
We need to be sure that the information is good enough to answer these questions and if not, we work out ways of collecting or improving it. The agreed improvements, objectives and targets are added to our service plans.
Communication within YHN around diversity and equality is also being reviewed to ensure that important information and policy or legislative changes are passed on to all staff.
We have a CEP Project within our Service Improvement Programme, with a number of projects to ensure that Top Twenty equality and diversity targets are achieved.
Following a review of our governance structure, progress on equality and diversity activities undertaken is reported directly to our board, and where it is necessary to scrutinise and challenge information we hold Board
Equality and Diversity workshops.
During 2009/10 we have:
• Included a separate section within our service plan for the Equality and Diversity Team, which identifies corporate responsibilities;
• Revised and strengthened our CEP. The plan identifies key diversity issues and explains the importance of addressing equality and diversity issues;
• Revised our EINA process to reflect the regulations and good practice developments that have occurred across the equality and diversity field;
• Conducted a review of Our Strategic Independent Advisory Group (SIAG). The review resulted in an agreed way forward and a developed workplan that will assist us achieve our equality and diversity objectives; and
• Made good progress in our migration to the revised Equalities Framework for Local Government and towards achieving Level 2 of the new framework.
• Achieved a place within the top 100 employers in the Stonewall Equality Workplace Index.
• Established a Lesbian Gay Bisexual Transgender (LGBT) employee network which is open to any member of staff who identifies as lesbian, gay, bisexual and transgender (LGBT). The network provides opportunities for members to talk about issues affecting them, speak safely about any difficulties faced at work because of discrimination or homophobia and provide input into YHN’s development of LGBT-friendly policies for staff and customers.
28 29
• Co-ordinated Adult Learners’ Week giving staff opportunities to share their expertise and learn new skills;
• Were recognised ‘2009 Employer of the Year’ by Newcastle City Learning for our commitment to staff development;
• Implemented the Customer Service Learning Framework enabling staff and customers to be involved in designing and delivering customer service related training;
• Introduced new programmes to raise awareness about our customers and improve our understanding of their needs such as Introductory British Sign Language, and Health and Housing;
• Co-ordinated the Investors in People re-assessment; and
• Continued to deliver competence based core business training.
During 2010/11 we will
• Develop an OD webpage to encourage staff to share learning resources and best practice with colleagues;
• Work in partnership with HR to implement YHN’s People Strategy, and the YHN Employee Capability Policy and Procedure;
• Action recommendations from the OD / HR service review;
• Implement the YHN Competence Framework for all staff; and
• Work towards achieving the North East Better Health at Work ‘Silver’ Award.
Information Technology (IT)
The mission of our IT service is to
provide secure, reliable and efficient
IT systems and services that support
productivity and excellent customer
service, and to get the right information
to the right people in the right way.
Over the next three years, we intend
to continue replacing out of date
and stand-alone IT systems with a
more integrated approach. We will
complete the replacement of our old
stock condition database with a more
modern Asset Management System this
year, and will also be improving our
reporting system. This will help us to
ensure that a full and consistent view
of our customers and procedures is
available to all staff when it’s needed.
We will continue to help our customers
to meet their needs through online
services delivered through our website,
though we recognise that the majority
of our customers do not yet have access
to the internet. We are providing
internet access and basic desktop PCs in
all sheltered housing schemes, and will
look for ways to help get other YHN
customers online.
We will respond to the increasing
popularity of mobile phones amongst
our customers by making much more
use of text messaging services. We
will also be launching a YHN Digital
TV service in 2010 through “Looking
Local”, and hope to use this service
in future to allow customers to view
properties, and bid for them, on their
TVs.
Risk management
YHN has a Risk Management Strategy in
place that sets out:
• Our commitment to implement an effective risk management framework;
• Our approach to risk management and how, as an organisation, we intend to embed risk management;
• Clear roles and responsibilities in the process of risk management; and
• Clear monitoring procedures at a strategic, divisional and service level.
YHN’s risk management framework
uses a top down approach starting with
the identification of risks at a strategic
level by Board Members and YHN
Management Team. When we identify
risks we assess their relative probability
and impact. This enables us to score
and prioritise the risks we face. We also
identify and assess what controls are in
place or may be required.
The above process is then repeated at
divisional and team levels throughout
the organisation. This approach
provides us with a comprehensive log of
strategic and operational risks.
Risks identified at a strategic level are
monitored and reviewed by board
members, YHN Management Team and
Audit Committee on a six monthly basis.
Risks identified at divisional and team
levels are monitored and reviewed by
the appropriate divisions, teams and
the Business Strategy Team also on a six
monthly basis.
Organisational Development
Our Organisational Development Team
(OD) ensures that all organisational and
learning and development initiatives
and opportunities are aligned to
business need. All services and teams
have their own annual Learning and
Development Plan developed with
OD. These are reviewed regularly to
ensure all learning and development
is timely, relevant and beneficial to
the organisation. Regular appraisal
and supervision ensure that all staff
understand how they contribute to our
strategic objectives.
We work with board members, staff
and customers. Their contributions are
invaluable in helping OD to make us a
learning organisation, where people
are given opportunities and support to
learn and develop effectively at work.
During 2009/10 we:
• Supported the development and implementation of Core Values promoting positive attitudes and behaviour towards partners, colleagues and customers;
• Designed and delivered 12 Institute of Leadership and Management (ILM) management and coaching programmes from Level 2 to Level 7;
• Generated over £15,000 income from ILM programmes with candidates from partner organisations undertaking higher level qualifications;
• Achieved the North East Better Health at Work ‘Bronze’ Award;
30 31
We have started to pilot the use of mobile technology, allowing staff to access IT systems away from the office. This allows us to spend more time supporting customers face to face, and less time working on computers in our offices.
IT security is an important part of our work, ensuring that information held on our IT systems is properly maintained and protected.
We also expect our IT systems to support our efficiency agenda, and are using “green” technologies to reduce the
energy used to run IT.
Environmental Sustainability
We are committed to meeting our responsibilities for the protection of the environment and tackling global warming, and to develop and integrate our policies to ensure the maximum benefit possible from them for all our customers. We recognise that we have a key role to play in meeting the city council’s sustainability objectives set out in its Climate Change Strategy. Major elements of the Modern Homes Standard and other parts of the housing capital programme deal with key sustainability issues including the installation of efficient central heating and high
performance double-glazed windows.
Our environmental policies are:
• For all timber components used in refurbishment to be from sustainable sources;
• To improve the heating and insulation standard of all council housing;
• To maximise the energy efficiency and minimise the carbon footprint of our operational premises; and
• To minimise the environmental impact of providing our services.
During 2009/10 we:
• Implemented procedures to comply with the Energy Performance of Buildings Directive;
• Completed a pioneering ‘Green Houses’ project with the Groundwork Trust at Glebe Street in Benwell;
• Maintained a continuous programme to improve the sustainability of our working methods and work places;
• Participated in the development of the city council’s corporate sustainability policy and programme;
• Continued to support and implement Newcastle Warm Zone;
• Constructed 34 new bungalows, 17 of which meet level three of the Code for Sustainable Homes and 17 are Ecohomes very good;
• Started the conversion of two district heating schemes to biomass fuel;
• Provided Energy performance certificates for 2,390 council properties on change of tenancy (2009 calendar year);
• Developed a pilot scheme for the conversion of lighting in communal areas to LED (light-emitting diode);
• Upgraded the sustainability of 1,990 council properties through the Modern Homes programme;
• Installed smart meters in 10 of our service delivery outlets; and
• Provided advice for tenants on sustainability.
During 2010/11 we will be developing a new environmental maintenance strategy. This will help to drive forward environmental initiatives around our customers, staff and the buildings and properties we manage.
5Looking back: what we achieved in 2009/10
Top 20 Targets 2009/10
The diagram below and on the following page shows predicted performance for our Top 20 targets for 2009/10.
It shows targets that were either achieved or are expected to be achieved by the end of March in green, and the targets not expected to be achieved in red. As the diagram shows, we expect to achieve 16 out of 19 targets. We are unable to predict performance about
the 20th target (shown in blue), as this is dependent on the results of a survey which is currently taking place. We have done well with our new build, re-let and rent arrears performance.
Areas where we need to do further work are around satisfaction levels although the score for overall satisfaction with the housing service is the highest we have achieved since the creation of Your Homes Newcastle.
Refurbishing and Building Homes
Reduce the average voids re-let time to 27 days by 31/03/10.
7,683 homes to be made decent in 2009/10.
Ensure 100% of all tender submissions to the Homes and Communities Agency completed to agreed timescales during 2009/10.
Achieve 85% satisfaction with the internals investment programme by 31/03/10.
Achieve 90 % satisfaction with the externals investment programme by 31/03/10.
97% of Modern Homes Programme spend to come within budget during 2009/10.
Achieve 92% satisfaction with the repairs and maintenance service by 31/03/10.
Set up and administer a separate and appropriate legal entity as a Board subsidiary by 31/05/09 to facilitate new business.
Continued overleaf
Your Homes Newcastle Top 20 2009/10 performance 01/04/09 – 31/03/2010
32 33
Three star excellent services
Achieve 81% satisfaction with the overall housing service by 31/03/10.
Maintain a minimum Housing Revenue Account balance of £5 million by 31/03/10.
Reduce net rent arrears to £2,650,000 by 31/03/10.
Achieve 3% efficiency saving on 2007/08 baseline budget by 31/03/10.
Develop an action plan to enable us to “move towards excellence” for the revised Equality Framework for Local Government standard by 30/06/09.
Support and care to communities
Achieve 81% BME satisfaction with the overall housing service by 31/03/10.
Achieve 50% level A’s in our Quality Assessment Frameworks for Supporting People contracts during 2009/10.
Achieve 60% satisfaction of tenants who report anti-social behaviour in 2009/10.
Access 10 additional sources of funding to raise £100k by 31/03/10.
Achieve 89% satisfaction with involvement services from involved customers by 31/03/10.
A quality workforce
Reduce the number of sickness days per FTE employee to 10.2 days by 31/03/10.
Retain Investors in People Status by 31/03/10.
34 35
Strategic objective achievements
2009/10 was another good year for us. We achieved many of our service plan targets and actions, and all teams have contributed towards meeting our strategic objectives.
Some of our other major achievements during the year are identified below, with comments where this links directly with a business plan action or target. The achievements are listed by strategic objective, although some of these achievements fit within more than one objective.
Support and care to communities
• Financial Inclusion strategy. We have launched our refreshed strategy aimed at working in partnership with other organisations to eliminate financial exclusion within our communities. This has already led to a number of new initiatives including tackling illegal money lending and offering free money management training for residents.
• Grants and benefits. Our Advice and Support Team have raised nearly £2million during the year in benefits and grants for tenants and leaseholders, accessing money for many residents on low incomes.
• 10 Year Asylum Seekers Unit (ASU) celebration. The ASU celebrated 10 years of working to provide support to asylum seekers arriving in Newcastle with an event in December 2009, attended by representatives from the voluntary and statutory sectors.
• Tenant Services Authority Local Standards Pilot (TSA). We completed a successful application to be part of a pilot scheme run by the TSA around
the services we offer to sheltered housing tenants across the city. This will lead to additional services being offered to help support sheltered housing tenants and to improve their quality of life.
• Concierge Service review. A comprehensive review of our Concierge Service was completed during 2009. The outcome of the review, following extensive consultation, was to create a central control room to manage door entry access and CCTV coverage of multi-storey and other blocks covered by the service. This will free up staff to provide more local on-site services to tenants, many of whom are vulnerable.
• Additional Advice and Support Services. During 2009 we expanded services through Supporting People funding to employ two additional workers to support vulnerable tenants with mental health problems to both take up and sustain tenancies.
• Prevention from eviction protocol. We have continued to work with partners to prevent eviction and to eliminate ‘repeat’ homelessness. During 2009 we have completed briefings for over 1,000 council, voluntary sector and YHN staff to make them aware of the protocol and services available to support people threatened by homelessness.
• Family Intervention Project. We extended the project during 2009 by accessing funding from both the Child Poverty Action Grant and the Youth Crime Action Plan. This additional funding will lead to expansion of the project and will help us achieve positive outcomes for
families with major problems, and the communities they live in.
• Free Telecare for the over ‘85’s. We have teamed up with the city council to offer six months of free Telecare to local people aged 85 and over. This initiative is open to all Newcastle residents, and should provide valuable support for this vulnerable group of people.
• Young People’s Service (YPS) Exchange visit. Following the successful visit of seven young customers of the YPS in 2008, 12 young people from Little Rock Arkansas visited Newcastle in July 2009 to gain a greater understanding about the YPS, and about global homeless issues.
• Housing and Employment Compact/Skills to Work. With the city council, Newcastle Futures and housing providers across the city we have contributed to the development of a compact aimed at supporting residents to improve their job prospects. Through the compact we will help residents to get involved in activities like volunteering, group work and education and training, with the aim of building their job skills, and helping them afford and sustain long term tenancies.
• Activities for older people. We had two ‘age friendly’ films selected for presentation at a Northern Housing Consortium event in January, out of only four films being shown at this ‘northern silver screen’. One was about our Telecare service, and the other was about positive activities, including ‘rookie golf’, and an inter-generational bowls project, two events for older people. The film highlighted the work we do to
encourage activities for older people and to break down intergenerational barriers.
• Adult Learners Week. This award winning event in May 2009 provided a forum to promote opportunities for tenants to get involved in learning and development activities, particularly providing support and encouragement for YHN tenants and staff gaining Numeracy and Literacy Certificates and basic skills qualifications.
• Severe weather assistance. Our concierge and sheltered housing staff helped with the wellbeing of our tenants by ensuring that all entrances and pathways to sheltered housing and multi storey blocks of flats remained clear from ice and snow through the severe winter weather.
• Child Safety Equipment Scheme. We secured two years funding for most of the running costs of the scheme, which will ensure that this valuable scheme continues to provide essential equipment to assist parents.
• Providing employment opportunities. We worked with the City Council (Adult Services) to support Palatine, a supported factory business that makes beds, employing people with disabilities. This has led to a new contract for Palatine to supply a range of composite doors to the city council, in addition to the supply of environmentally friendly beds. Palatine has also maintained sales levels during 2009/10 despite the recession.
36 37
Three star excellent services
• Business Plan-‘Stepping up: Improving on Excellence in challenging times’. Information about our first business plan, published in 2009, is included in section two of this plan. The business plan will help give focus to all our activity for the next four years, and will help us to improve our services further.
• Customer Service Excellence (CSE)/Charter Mark. Six of our services achieved the CSE standard during 2009, including four of our five support and care services. The services are: Advice and Support, Asylum Seekers Unit, Concierge, Young People’s Service, Right to Buy and Your Choice Homes. CSE has replaced Charter Mark as the Governments key customer service standard. All services that have not yet transferred to the new standards retained their Charter Mark status.
• Customer Involvement. Our involvement service was featured in a Housing Quality Network good practice document ‘What does excellence look like – resident involvement’ in June 2009. Since the publication of the document, a number of housing providers have visited us to learn about our approach and meet our tenants.
• Your Choice Homes. In partnership with the city council and other housing providers in the Tyne and Wear area, we launched a new sub regional mutual exchange scheme in August 2009, to increase mobility options for tenants. There were over 50 exchanges through this scheme up to February 2010, and this figure is likely to rise considerably during 2010.
• Digital TV for customers. In December 2009 we introduced ‘Looking Local’, a Digital TV and mobile phone service owned by Kirklees Council, as another access channel for our customers. This provides another method of making information available continuously to our customers through the Digital TV platform. Creating additional access for our customers is a key component our Customer Service Strategy “Every Customer Matters”.
• Review of all service standards. During 2009 and early 2010 we carried out a review of all our service standards, both for customer facing services, and for internal ‘back office’ teams. This involved extensive consultation with customers, staff and partners to ensure that the standards are meaningful for our customers, and are challenging.
• UK Housing Award finalists. We had three entries shortlisted in the 2009 Chartered Institute of Housing UK Housing Awards, more than any other housing organisation. Two of the shortlisted applications were for initiatives developed by our HASBET and CCAS teams. The third was the Inspirational Colleague award for one of our employees, Lesley Sandland, who has continued to be an inspiration to colleagues despite serious illness. HASBET also received a runners-up award from Lemos and Crane’s ASB Action Net in April 2009.
• Telecare Services Authority accreditation. Our Community Care Alarm Service retained three levels of Telecare Services Authority accreditation in October 2009. CCAS is classed as a ‘premier’ service
reflecting the high quality service provided. The CCAS manager is currently on the board of the Telecare Services Authority.
• Supporting People. We exceeded our Supporting People targets through the QAF (Quality Assessment Framework). Supporting People funds many of the support services we provide, and the QAF measured the quality of the services we provide. Our Young People’s Service achieved 17 out of 18 level ‘A’ grades, and our Advice and Support Team four out of six, both above the challenging targets we had set ourselves.
• Extending Gardening Service. We extended our gardening service citywide so that it is available to all council tenants in Newcastle. The scheme has proved to be very popular, and has grown rapidly during 2009
• Expanding furniture service. We entered into contracts with South Tyneside Homes and Gateshead Housing Company to supply furniture packs to their tenants. We have already supplied over 100 packs to South Tyneside, and we are about to start supplying Gateshead tenants.
A quality workforce
• Core values. The introduction of core values during 2009 is explained in section two of this delivery plan. This is an important development that will have and important positive impact on the way we deliver services.
• Staff satisfaction survey. We carried out a survey of all our staff in 2009. The purpose of this was to give everyone the opportunity to tell us how they feel about working for us. Every member of staff received the survey, and over 70% responded. This informed our People Strategy.
• People Strategy. Our overall vision for the future of our people is to achieve: ‘A highly engaged and skilled workforce proud and happy to work for Your Homes Newcastle’. To help achieve this we developed our new people strategy. This sets out the actions we will take over the next four years to enable us to recruit, develop and retain a quality workforce with the right skills and attitude who are enabled to consistently deliver excellent services to our customers both now and into the future.
• Investors in People. We have maintained our Investors in People status during 2009. We were assessed in February 2010 and we gained the Bronze Award level. ‘Investors in People’ is a standard of best practice on business performance which focuses on people and their learning and development.
• ‘Better Health at work’ award (NHS Public Health NE) In December 2009 we achieved the Better Health at Work award-bronze level. This recognises the progress we have made in improving the health and well-being of our workforce and making our workplace a healthier place to be. Over the past year we have implemented a fresh fruit delivery service and an initiative to help staff stop smoking.
38 39
• Employee Assistance Programme. In 2009 we introduced an independent and confidential service to help staff with issues like financial difficulties, relationship problems, family illness and traumatic incidents at work.
• Learning at Work. Held in May 2009 as part of Adult Learners week, this initiative involved a series of short workshops, some delivered by members of staff who were willing to share particular knowledge, skills or expertise they felt may be of interest to their colleagues. We were awarded the ‘Best Employer’ title in the Celebration of Success Adult Learning Awards 2009.
• Institute of Leadership and Management (ILM). Our OD team designed and delivered 12 management and coaching programmes from Level 2 to Level 7. This has developed knowledge and skills of existing managers and employees who aspire to become YHN managers in the future.
• The Stonewall Workplace Equality Index. In January 2010 we were ranked within the Stonewall Top 100 Employers 2010 Workplace Equality Index. This demonstrates our commitment to supporting lesbian, gay and bisexual members of staff.
Refurbishing and building homes
• Leazes Homes. Following discussions with the City Council, we set up a charitable company, Leazes Homes, to enable us to build new affordable homes.
• Completed new build properties. We successfully completed our first new build project, the construction of 34 bungalows on three sites across Newcastle.
• Developer Panel. We established a panel of developers to provide the expertise to take forward projects and ensure through a competitive process that value for money is always provided.
• Started new build properties. With support from the Homes and Communities Agency we achieved start on sites for a total of 65 affordable homes and 45 homes for private sale, including supported housing for young families, the learning disabled and general needs family accommodation.
• Slatyford 3 storey flats. We worked with Benfield school and our construction partner Frank Haslam Milan Ltd. to involve young people in construction, and to raise awareness of environmental issues.
• Daisy Hill estate. We secured additional funding from Bridging Newcastle Gateshead (BNG) pathfinder, and SHIP to deliver environmental improvements to some properties on this estate.
• Milecastle House and Wansbeck House. We carried out a number of conversions of unpopular bed sit flats, involving older people from the Quality of Life partnership in the design of these new life time homes conversions.
• Adaptations service review. We have introduced a new service to assist residents to move, rather than adapt existing unsuitable homes.
This list is a summary of some of the big achievements, but all teams across the organisation have contributed towards our drive towards achieving our strategic objectives.
Investment and modern homes
In October 2004, the YHN Board agreed a YHN Investment Programme to meet the Government’s Decent Homes Standard by 2011. An initial group of 12 construction partners were appointed to help us deliver the programme. These partners have been subject to quarterly and annual benchmarking to ensure that only the lowest cost highest quality constructors receive allocations of work each year. As part of continued review, we are looking to progress delivery through the North East Procurement consortium framework to gain further efficiencies.
Since 2004 the programme has been revised on an annual basis to reflect changes in allocations from the Government and progress made during the previous year. Proposed schemes
for 2009/10 within our Modern Homes Investment Programme were agreed by YHN Board in January 2009.
Good progress has been made during 2009/10 towards achieving priorities, including completion of decent homes ‘packages’ contributing to the decency targets.
Programmes have been changed due to various practical issues, such as unexpected levels of work identified on site or estates being held under regeneration reviews. This has resulted in some estates being deferred to 2010/11 and others replacing them, providing a better fit against resources available, and ensuring continual value for money.
Overall progress is given below:
2005/06 2006/07 2007/08 2008/09 Qtr 2 Qtr 3 Q3 2009/10 2009/10 2009/10 2009/10 Target Outturn
Number of packages 5,678 7,741 7,396 7,624 33,061 34,680 6,241 8,351 completed
Number of units made 1,063 2,074 6,113 5,885 18,131 18,934 4,127 7,683 decent
Average energy efficiency (SAP) SAP 60 SAP 61 SAP 64 SAP 64 SAP 69 SAP 70 SAP 70 SAP 69 rating
Annual Cumulative Current year Outturn Outturn Outturn against (from 2004) target
Current Progress at 31.12.2009
40 41
6Looking forward: what we aim to achieve in 2010/11
Our ‘Top 20’ targets
We have identified 20 ‘business critical’ targets which will be monitored by our Performance Committee on a quarterly basis. We think that these targets will give a good overall picture of how we are doing during the year to our customers, the Tenants’ Federation, our board and Newcastle City Council. These are aligned with our four strategic objectives. The ‘top 20’ targets for
2010/11 are:
Refurbishing and building homes
• Reduce the average voids re-let time to 21 days by 31/03/2011.
• 6,869 homes to be made decent in 2010/11.
• Achieve 85% satisfaction with the internals investment programme by 31/03/2011.
• Achieve 93% satisfaction with the externals investment programme by 31/03/2011.
• 97% of Modern Homes Programme spend to come within budget during 2010/11.
• Achieve 92% satisfaction with the repairs and maintenance service by 31/03/2011.
• Start on site 52 new properties and complete 46 by 31/03/2011.
Three star excellent services
• Achieve 81% satisfaction with the overall housing service by 31/03/2011.
• Reduce net rent arrears to £1,900,000 by 31/03/2011.
• Achieve 3% efficiency saving on 2008/09 baseline budget by 31/03/2011.
• Meet the ‘achieving’ level of the Equality Framework for Local Government by 30/06/2010.
• Achieve the Corporate Customer Service Excellence accreditation by 31/03/2011.
• Agree local standards with tenants for the service areas outlined by the Tenant Services Authority by 31/03/2011.
Support and care to communities
• Maintain 81% BME satisfaction with the overall housing service by 31/03/2011.
• Achieve 60% level A’s in our Service Quality Frameworks for Supporting People contracts during 2010/11.
• Achieve 60% satisfaction of tenants who report anti-social behaviour in 2010/11.
• Achieve 89% satisfaction with involvement services from involved customers by 31/3/2011.
A quality workforce
• Reduce the number of sickness days per FTE employee to 9.6 days by 31/03/11.
• Achieve North East Better Health at Work Silver award by 31/12/2010.
• Implement Staff Competency Framework by 31/10/2010.
The other capital programmes that make up the Housing Investment Programme are
summarised below.
This expenditure is for projects outside modern homes work, made up of the
following:
• Environments and modern homes plus;
• Landlord services;
• Meeting special needs;
• Redevelopment and demolitions;
• Improving customer services.
Other Capital Programmes Totals to 2011/12
At end Q3 2008/09
Current Expenditure Forecast £101.2M
Current HIP Resource Allocation £102.7M
Current Programme Excess Funding £1.5M
42 43
Wider Management Team targets
The targets that we have identified below are ones which our senior managers will be monitoring on a regular basis through the year. These represent key areas of work for all teams within YHN. This list of targets will enable senior managers to recognise and acknowledge things that are going well. If any of the targets are not being met during the year, our
Wider Management Team will decide what action is required to address any problems. Several of the targets are repeated in the table where these are the responsibility of more than one team.
The targets highlighted in red in the table are ‘Top 20’ targets. These are included as they will also be monitored by the Wider Management Team.
Target ReasoningHow the top 20 targets were set for 2010/11
The following table provides further information about the targets and how they
were set: Agree local standards with tenants for the service areas outlined by the Tenant Services Authority by 31/03/2011.
Achieve 81% BME satisfaction with the overall housing service by31/03/2011.
Achieve 60% level A’s in our Service Quality Frameworks for Supporting People contracts during 2010/2011.
Achieve 60% satisfaction of tenants who report anti-social behaviour in 2010/2011.
Achieve 89% satisfaction with involvement services from involved customers by 31/03/2011.
Reduce the number of sickness days per FTE employee to 9.6 days by 31/03/2011.
Achieve North East Better Health at Work Silver award by 3112/2010.
Implement Staff Competency Framework 31/10/2010.
This is a Tenant Services Authority requirement.
Maintain performance. Numbers responding to the STATUS survey are low.
This is a 10% increase on the 2009/2010 target. A new framework introduced has raised the bar for achieving level A.
This target has been rolled over as we did not achieve the satisfaction rate in 2009/10.
This target has been rolled over as we did not achieve the satisfaction rate in 2009/10.
This target is set to achieve the performance of our comparators.
This target aims to build on our 2009/2010 achievement of the bronze award.
New target.
Target
Reduce the average voids re-let time to 21 days by 31/03/2011.
6,869 homes to be made decent in 2010/11.
Achieve 85% satisfaction with the internals investment programme by 31/03/2011.
Achieve 93% satisfaction with the externals investment programme by 31/03/2011.
97% of Modern Homes Programme spend to come within budget during 2010/2011.
Achieve 92% satisfaction with the repairs and maintenance service by 31/03/2011.
Start on site 52 new properties and complete 46 by 31/03/2011.
Achieve 81% satisfaction with the overall housing service by 31/03/11.
Reduce net rent arrears to £1,900,000 by 31/03/2011.
Achieve 3% efficiency saving on 2008/09 baseline budget by 31/03/2011.
Meet the ‘achieving’ level of the Equality Framework for Local Government by 30/06/2010.
Achieve the Corporate Customer Service Excellence accreditation by 31/03/2011.
Reasoning
This is a further reduction on the 2009/2010 target of 27 days.
This is based on decent homes projections for 2010/11.
Maintain performance. As there is more disruption for customers satisfaction rates tend to be lower for internals than externals.
This is a 3% increase on the 2009/2010 programme of 90%.
Maintain 2009/2010 performance.
This is an existing target carried forward. It is a contractual target with the repairs and maintenance service provider.
This is a new target.
This is an existing target carried forward. In 2009/2010 79% was achieved, a 6% increase on 2008/09. As this is a National Indicator the aim is to be top quartile.
This is a further reduction on the target of £2.4 million in 2009/2010.
This is an existing target carried forward. The target is set by central government for local authorities and YHN is expected to contribute to the city council efficiency savings.
This is a new target, for a new framework.
This is a new target building on individual services accreditations.
Target Type Colour
YHN Top 20 and WMT target P
WMT target Pi
No YHN Top 20 or WMT target Y
2010-11 YHN Top 20 and Wider Management Team (WMT) targets
44 45
Headline Targets
• 6869 homes to be made decent in 2010/11
• 97% of Modern Homes Programme spend to come within budget during 2010/11
• Deliver 97% of projects on Planned Environmental Maintenance Schemes (PEMS), Housing Project Fund (HPF) and Structural Minor Works during 2010/11
• Start on site 52 new properties and complete 46 by 31/03/2011
• Ensure 100% of all tender submissions to the Homes and Communities Agency completed to agreed timescales during 2010/11
• Produce 100% of policies, strategies and procedures to approved templates within agreed timescales during 2010/11
• Identify and deliver a full research programme by 31/03/2011
• 6869 homes to made decent in 2010/11
• Achieve 93% satisfaction with the externals investment programme by 31/03/2011
• Achieve 85% satisfaction with the internals investment programme by 31/03/2011
• 97% of Modern Homes spend to come within budget during 2010/11
• Carry out Leasehold Service review by 31/03/2011
• Implement a staff competency framework by 31/10/2010
• Achieve North East Better Health at Work silver award by 31/12/2010
• In partnership with the HR Team implement actions by deadlines outlined with the YHN People Strategy
• Achieve 89% satisfaction with involvement services from involved customers by 31/3/2011
• Agree local standards with tenants for the service areas outlined by the TSA by 31/3/2011
• Make sure the database of ‘make a difference’ volunteers is representative of the tenant population in terms of age, gender, ethnicity, disability, religious beliefs and sexual orientation by 31/03/2011
• Meet the requirements set out by the Tenant Services Authority to agree and publish an approach to working with tenants to agree local standards for services by 1/10/2010
Team
Assets and Programming
Business Strategy Team
Investment Delivery Team
Leasehold Team
Organisational Development Team
Customer Involvement Team
Directorate
Business
2010-11 YHN Top 20 and Wider Management Team (WMT) targets
P
P
P
P
P
Pi
Pi
Pi
Pi
Pi
46 47
Headline Targets
• Achieve a 15% increase in traffic to the YHN website by 31/03/2011
• Hold the first AGM for Leazes Homes during 2010/11
• Meet the ‘achieving’ level of the Equality Framework for Local Government by 30/06/2010
• Adopt the key features of the Public Sector Equality Duty contained within the new Single Equality Act by 31/01/2011
No YHN Top 20 or Wider Management Team targets during 2010/11
• Maintain a minimum Housing Revenue Account (HRA) balance of £5 Million by 31/03/2011
• Access additional sources of funding to raise £500k by 31/03/2011
• Leasehold Service Charges for 2009/2010 actual costs will be invoiced at a block level by July 2010
• Maintain a minimum Housing Revenue Account (HRA) balance of £5 million by 31/03/2010
• Achieve 3% efficiency saving on 2008/09 baseline budget by 31/03/2011
• Maintain a minimum Housing Revenue Account (HRA) balance of £5 million by 31/03/2011
• Reduce number of sickness absence days per full time equivalent to 9.6 days by 31/03/2011
• In partnership with the OD Team implement actions by deadlines outlined with the YHN People Strategy
• Contribute to achieving a minimum Housing Revenue Account Balance of £5 million by 31/03/2011
• Collect £400k of Former Tenants Arrears during 2010/11
• Collect 97% of leasehold service charges during 2010/11
• Collect 80% of leasehold major works invoices during 2010/11
No YHN Top 20 or Wider Management Team targets during 2010/11
Team
Chief Executive’s Office
Equality and Diversity
Administration and Facilities
Finance Business Support
Finance Procurement and Payments
Finance Revenue
Human Resources
Income Team
Right to Buy
Directorate
Chief Executive’s Office
Finance and Resources
Pi
P
Pi
Y
Pi
Pi
Pi
Pi
Pi
Y
P
P
48 49
Headline Targets
• Project delivery: 82% of projects (and key milestones) delivered to agreed timescale during 2010/11
• Carry out an IT service review by 31/03/2011
• Achieve 60% level A’s in our Service Quality Framework assessments for Supporting People contracts during 2010/11
• Complete service review by 30/09/2010
• Achieve 60% level A’s in our Service Quality Framework assessments for Supporting People contracts during 2010/11
• Complete service review by 30/09/2010
• Achieve 5% increase in CCAS/Telecare client growth by 31/03/2011
• Continue implementation of the Concierge Service review recommendations by 30/03/2011
• Carry out HASBET and Rent Recovery service review by 31/03/2011
• Increase external managed furnished tenancies by 40% by 31/03/2011
• Carry out HASBET and Rent Recovery service review by 31/03/2011
• Achieve 60% level A’s in our Service Quality Framework assessments for Supporting People contracts during 20010/11
• 90% of people living in our supported accommodation at North Kenton to maintain their tenancy for at least six months during 2010/11
• Complete all 2010/11 allocated actions in relation to the Councils new Lettings Policy
Team
YHN IT
Advice and Support
Asylum Seekers Unit
Care Services
Concierge
HASBET
NFS
Rent Recovery Team
YPS
YCH
Directorate
Pi
P
P
P
Pi
Pi
Pi
Pi
Pi
Pi
Pi
Pi
Citywide Services
50 51
Headline Targets
• Achieve the corporate Customer Service Excellence accreditation by 31/03/2011
• 95% of complaints to be given a full written response within 10 working days during 2010/11
• Reduce the average time taken to re-let properties to 21 days by 31/03/2011
• Reduce net rent arrears to £1,900,000
• Achieve 81% customer satisfaction with the overall housing service by 31/03/2011
• Achieve 60% satisfaction of tenants who report anti-social behaviour by 31/03/2011
• Achieve 81% Black Minority Ethnic (BME) satisfaction with the overall housing service by 31/03/2011
• Carry out service review by 31/12/2010
• Achieve 92% satisfaction with the Repairs and Maintenance Service during 2010/11
• Ensure that 90% of maintenance contracts Key Performance Indicators (KPI’s) are achieved in 2010/11
Team
Customer Service
Housing Management
Property Maintenance Team
Directorate
Tenancy Services P
Pi
P
P
Pi
Pi
52 53
Investment and modern homes
The modern homes partner allocations
for 2010/11 will be agreed by the
YHN Board. These include allocations
to existing partners and new
contacts through the NEP (North East
Procurement) framework. The 2010/11
programme reflects the prioritised and
programmed approach towards our
ultimate decent homes target. Our full
programme for the year is attached to
this plan (Appendix 4).
The modern homes programme for
2010/11 remains significant. We
anticipate capital spend of £62.6
million of which £56 million relates
to the modern homes programme
(the remainder covers demolitions,
capitalised voids properties, Riverside
Dene regeneration, and so on).
Our key modern homes targets for
2010/11 are:
• Decent Homes work (internal and external packages of work) to be completed to approx. 8,354 properties by 31/03/2011.
• 6,869 homes to be made decent in 2010/11.
The second of these targets is in our
‘Top 20’ targets, and the first one is a
‘Wider Management Team’ target for
2010/11.
Future business
Our future business until 2014 and an
overview of our direction for the next
four years is explained in our business
strategy, which is summarised in section
two of this plan.
Our future business will continue to
be developed through discussions with
NCC. Opportunities that arose through
the provisions of the Housing and
Regeneration Act 2008 will continue to
drive some of the work that we do. This
includes working with the Homes and
Communities Agency, to build new and
affordable homes across all tenures and
driving investment in regeneration. It
also includes working with the Tenant
Services Authority (TSA) in relation to
their new framework to regulate social
housing.
Some of our new business already
identified for 2010/11 will include:
• Developing new service standards for service areas defined by the TSA, in full consultation with tenants and other customers.
• Working with the City Council to introduce the council’s new lettings policy. This will involve working with sub regional partners to develop one lettings service for the Tyne and Wear area.
• Offering anti-social behaviour services to other social landlords.
• Expanding services provided by our furniture service. This has been made possible by acquiring a new warehouse in September 2009. This includes developing partnership working with Wakefield Homes and other social landlords in Yorkshire, following discussions and expressions of interest during 2009.
In terms of building new properties, we
will:-
• Progress with our partners new opportunities to bring developments to market;
• Look at providing different housing tenure types and help enable people to chose the housing option that best meets their needs and circumstances; and
• Build on 2009/10 and bring on four new sites to start on site in 2010/11.
54 55
Appendix 1Business and fi nancial planning diagram
Steering group launch the process through Senior Management Teams (SMTs)
Managers complete thePlanning Proforma
Service Plan preparatory information produced
Service Plan preparatory information to managers for discussion with staff
Steering group collate feedback from all sources
Draft Service Plan produced (with agreed 3% effi ciency savings to feed into medium term
plan and service budgets)
Final Draft Delivery Plan, base budget and medium term plan produced
Reported to Management Team, Boardand NCC for agreement
Organisational and Team Learning and Development plans developed (reviewed
quarterly with managers)
Targets and Actions cascaded through individual appraisals and 1:1 meetings
Launch of Delivery Plan
• Information from managers to SMT’s for comment
• YHN Management team agree Directorate effi ciency saving allocations
Team meetings:• Managers agree targets and actions with
their staff• Staff identify achievements and outcomes
for customers
Steering group collate feedback from all sources
Monthly budget monitoring meetings
Draft Service Plan consultation – NCC, Tenant’s Fed and customers
Monthly feedback on issues raised during the process via
Housing Services News
Performance against targets monitored and reported
Corporate issues reported to Management Team Initial
feedback to staff on their contribution to the process –
opportunity to comment
Initial consultation on Service Plan preparatory information –
NCC, Tenant’s Fed and customers
May
June
July
August/September
October/November
October/November
December -March
April and beyond
55
56 57
What is the Service Plan?
The YHN Service Plan is an annual
document which sets out what all
our teams do, and what they want to
achieve during the year. It explains
how all teams contribute to meeting
the strategic objectives identified in
the Delivery Plan. The information is
in alphabetical order on a directorate
basis.
How is it developed?
We use a business and financial
planning process to produce service
plans. This process is described in the
delivery plan. It involves discussing team
priorities, financial issues and potential
targets and actions to achieve objectives
with managers and staff from across
the organisation. We consulted with
a cross section of staff from all teams
and sections during 2008/09. We also
spoke to service users to find out what
the important issues were for them. All
of the information produced from this
process was condensed into a list of
possible actions and targets. Through
further consultation with customers,
senior managers, managers and staff,
this list was refined further into a final
plan for each team.
What is in the plan?
The service plan includes information
about what teams do, and lists actions,
targets and indicators for each service.
It also includes service standards for
all teams. The service plan is used as a
working document for managers and
staff across the organisation, and is
developed and refined further each
year. An organisation chart is included
to show how the individual teams fit
into the YHN structure. The targets and
actions are drawn from a wide range of
sources in addition to those identified
by managers, staff and tenants. These
include statutory or legal requirements
and YHN strategic policy documents.
The intention is that the service plan
acts as a comprehensive reference
document for staff in identifying key
targets and action areas. There is also
a link between what is in the service
plan, and what is identified in individual
workplans, appraisals and supervision
sessions within teams.
Specific information in the plans is
made up of:
• Our ‘Top 20’ targets. A list of strategic
targets which are considered ‘business
critical’. These also appear in the
Delivery Plan and form the basis of
performance reports to the YHN
Performance Committee. They are
also monitored regularly by senior
managers.
• Our ‘Wider Management Team’
targets. An additional set of 33
targets and actions identified by
YHN Management Team to represent
overall performance and key actions
for each team. These are also
included in the team service plans
to ensure accountability, and are
discussed at regular meetings of the
Wider Management Team of senior
managers regularly.
• Team targets and actions. These
form the basis of team service plans
and are used by managers to assist
in guiding and focussing the work
of their teams. They are used as a
basis for monitoring performance
within teams, and they link with
staff supervision and annual staff
appraisals.
• Service Improvement Plan actions.
Work that is being carried out
through the Service Improvement
Plan such as service and policy
reviews is included, so that there is a
cross reference between the service
plan and the Service Improvement
Programme.
• Equality and diversity targets.
These are identified for each team
so that staff are clear about their
responsibilities in relation to diversity
issues.
• Service standards. These are included
so that performance against service
standards is monitored in the
same way that all other targets
are, through the performance
management framework. We
have carried out a review of all
service standards during 2009/10 in
consultation with customers. The
review is complete for most services,
but several sets of standards are still
subject to consultation. For these
services, previous standards are
included, but these will be updated as
new standards are finalised.
What changes have we made this year?
The plan is similar to last year’s, although
we have refined the content again.
The code list at the beginning of the
service plan identifies the source of each
action and target listed. Actions and
targets are also colour coded to reflect
different categories of target which are
identified below and in section three of
the Delivery Plan. The codes have been
changed this year to establish more of
a link between the service plan and
work monitored through our Service
Improvement Programme, explained in
section three of the Delivery Plan.
We have reduced the number of targets
and actions again this year, and we
have made an effort to ensure that all
targets are SMART (specific/ measurable/
achievable/realistic/timely), and that they
are meaningful for our customers.
We have also included a glossary of
terms at the end of the plan this year for
the first time.
How is the plan monitored?
All of the actions and targets listed in the service plan are monitored through the performance management framework. This is described in the Delivery Plan. It involves regular liaison with the manager of each service to check that actions and targets are completed by the due date. Information about performance is reported to the YHN Performance Committee on a quarterly basis. If actions or targets are not being met and are reported to the committee as ‘red’, the relevant manager is required to take necessary action or develop a plan to ensure that performance improves.
Appendix 2The YHN Service Plan to 2010/11
58 59
Target Type Colour
YHN Top 20 and wider management team P
Wider management team Pi
Service standards O
Team target Y
Equality and diversity target B
Strategy R
Team action G
Chief Executive
Director of Tenancy Services
Care and Support Services
- Advice and Support
- Asylum Seekers’ Unit
- Community Care Alarm Service and Sheltered Housing
- Concierge Service
- Young People’s Services
Citywide Services
- Anti Social Behaviour (HASBET) and Rent Recovery
- Newcastle Furniture Service and Garden Care
- Your Choice Homes
Customer Service
Housing Management
Property Maintenance
Assets and Programming
Business Strategy
Investment Delivery
Leasehold Service
Organisational Development
Customer Involvement
Central Services
Finance
Human Resources
Income
Right to Buy
YHN IT
Assistant Chief Executive and
Director of Business
Director of Finance
and Resources
Communications Equality & Diversity
Governance Management
Support
Source Code
Support and care to communities 1
Three star excellent services 2
A quality workforce 3
Refurbishing and building homes 4
Commission of Racial Equality action plan 5
Service Improvement Plan 6
How we spend your rent – tenant focus group 7
Business and fi nancial planning – managers suggestion 8
Business and fi nancial planning – staff suggestion 9
Corporate Equality Plan 10
Legal requirement 11
Equality Impact and Needs Assessment (EINA) 12
Environmental maintenance 13
National Indicator 14
Service Plan Code List and Colour Key Organisational Structure
60 61
Directorate: Business DevelopmentTeam: Assets and Programming
• Asset Management strategy – development and implementation
• Preparation, prioritising monitoring and control of the YHN Investment Programme and budget including:
• Decent Homes Standard • Modern homes • Landlord services • Meeting special needs • Demolition and redevelopment • Improving customer services, including office accommodation • Managing and monitoring the painting programme • Programme monitoring of all non-decent homes work • New build programme • Housing Project Fund • Planned environmental schemes • Fire safety programmes • One off capital projects
• Business Planning information and analysis including sustainability assessments
• Controlling the delegated decision process
• Prioritisation of capital expenditure
• Consortia working
• Construction procurements
• Development and management of the 50 year investment plan
• Monitoring works completed or required and disseminating information as relevant to other IT systems, such as warranties, decency tracking, adaptations, website, PS Team contract monitoring
• Management and development of stock condition information
• Construction related health and safety including asbestos monitoring
• Identifying and evaluating sites for development of housing new build
• Management of community building budget
• Management of all aspects of leasehold tenure on behalf of Newcastle City Council
• Adhere to all leasehold legislation in relation to issuing and managing of service charge accounts, lease terms and statutory consultation.
The targets below are monitored on a quarterly basis through the service plan monitoring programme
YHN Top 20 and Wider Management Team targets
4 • 6,869 homes to be made decent in 2010/11
4 • 97% of Modern Homes Programme spend to come within budget during 2010/11
Wider Management Team targets
9 • Deliver 97% of projects on PEMS, HPF and Structural Minor Works during 2010/11
6 • Carry out Leasehold Service review by 31/03/2011
Service standards
Assets and Programming:
• We will produce a quarterly report to Performance Committee, Customer and Service Delivery Committee and managers on the Modern Homes Programme progress during 2010/11
• We will ensure the Housing Investment Programme is monitored through monthly business meetings with budget holders during 2010/11
• We will present resulting priorities and proposals to Investment Executive quarterly during 2010/11 to ensure value for money and strategic programme priorities are maintained.
• We will update all information systems within specified timescales:
• Property Information system (IIS) once a week • Property moves and omits with two working days upon receiving request • Website information relating to Modern Homes Programme every two weeks • Financial updates received from the construction partners are updated into the Modern Homes Programme model within one working day upon receiving request
• We will acknowledge all internal information requests within five working days of receiving request; detailing an expected completion
• We will provide quarterly KPI information on Constructor performance on the Modern Homes Programme for quarterly benchmarking meetings
• We will complete a technical assessment for all PAFF submissions within five working days of receipt
• We will provide technical recommendations on HPF schemes and budget estimates to housing management within two weeks of request
Key work areas: Ref
P
Pi
O
62 63
Ref
• We will provide technical support to carry out surveys and inspections etc. to other YHN teams within two weeks of receiving the request
Leasehold:
• We will send you an estimated invoice for the year ahead by 31st March each year, and an actual bill for the previous year by 30th September each year
• We will send you a leasehold newsletter twice a year
• We will invite you to a leasehold event once per year
• We will consult with you a minimum of 30 days before we carry out any major work to your home (legal requirement)
• We will consult with you at least 30 days before we make any major changes to services you receive which involve long term partner agreements (legal requirement)
Team targets
4 • Complete independent internal works surveys for all remaining properties in the Modern Homes Programme by 31/08/2010
9 • All asbestos surveys to be incorporated within the new Asset Management IT System by 30/06/2010
4 • Quarterly cost and quality benchmarking of construction partners to take place during 2010/11
8 • Complete the implementation of the Asset Management IT system, with the last phase of integration to Northgate complete by 31/10/2010
9 • 80% of Housing Project Budget to be committed and orders placed by 30/11/2010
9 • All HPF and PEMS works to be identified by 30/09/2010
2 • Develop a process for the collection of customer satisfaction information on non-modern homes works and set a baseline for future targets by 30/09/2010
2 • Participate in the HQN leasehold benchmarking survey during 2010/11
4 • Average Standard Assessment Procedure rating of local authority owned dwellings of 71 by 31/03/2011 (BV 63)
2 • We will send all new leaseholders a welcome pack within 30 days of notification of sale completion during 2010/11
2 • We will issue all leaseholders an annual report including demographic information and performance information during 2010/11
2 • We will achieve 65% leaseholder customer satisfaction during 2010/11
Ref
Equality and Diversity targets
2 • Monitor and measure construction partners outcomes against agreed Key Performance Indicators to reflect the diversity of the community in respect of both services provided and as employers during 2010/11
8 • Monitor leaseholder loan uptake by BME groups and set a baseline during 2010/11
12 • Complete an EINA on the YHN Asset Management Strategy by 31/03/2011
12 • Complete an EINA as part of the Leasehold Service review by 31/03/2011
The actions below contribute to achieving all of the above targets
Team actions
4 • Monitor our construction partners to ensure that they meet the
following Modern Homes Programme targets:
• 8354 improvement packages to be delivered during 2010/11
• 6869 (to be confirmed) homes to be made decent in 2010/11
2 • Monitor leasehold internal performance indicators on a quarterly basis
2 • Undertake an annual leaseholder satisfaction survey by 31/12/2010
O
Y
G
B
64 65
Directorate: Business Team: Business Strategy Team
• Establish, develop and implement performance management and monitoring frameworks
• Formulate, develop and update policy and strategy
• Provide support to operational teams when requested
• Manage the YHN Improving on Excellence service improvement programme
• Strategic, divisional and team risk management
• Evaluate business propositions
• Carry out research for YHN and ensure there is a comprehensive understanding of our customer base
• Work on key procurements
• Will embed a robust contract management structure for all Service Level Agreements
• Co-ordinate service improvements as recommended by the TSA
• Disseminate information on housing initiatives, policy development and legislative changes
Key work areas:
Ref
Ref
• We will produce quarterly performance management reports during 2010/11
• We will produce quarterly research reports during 2010/11
• We will deliver two risk management update sessions to YHN Board, Audit Committee and each Senior Management Team during 2010/11
• We will update our pages of the YHN staff intranet on a quarterly basis to ensure an accurate reflection of our current work and team members during 2010/11
• On receiving a request for advice on policy and strategy development we will agree the next steps required within 10 working days during 2010/11
• We will report to Performance Committee twice annually on milestones delivered as part of the Service Improvement Programme during 2010/11
Team targets
2 • Ensure that all draft SLA’s for 2011/12 are formulated by 31/03/2011
7 • Build 10 two bed bungalows with affordable rents for the over 60’s by 31/03/2011
7 • Build 59 houses for family accommodation by 31/03/2011
9 • Complete annual Business and Financial Planning cycle to agreed timescales during 2010/11
2 • We will produce quarterly performance management reports for performance committee and NCC during 2010/11
9 • Complete 99% of Housemark benchmarking exercises to agreed timescales during 2010/11
Equality and Diversity targets
8 • Deliver a supported housing scheme for young families by 31/01/2011
12 • Complete an EINA on the YHN Risk Management Strategy by 31/03/2011
5 • Complete all CRE actions within the CRE action plan on time during 2010/11
P
Pi
O
O
Y
B
The targets below are monitored on a quarterly basis through the service plan monitoring programme
YHN Top 20 and wider Management Team target
7 • Start on site 52 new properties and complete 46 by 31/03/2011
Wider Management Team targets
4 • Ensure 100% of all tender submissions to the Homes and Communities Agency completed to agreed timescales during 2010/11
2 • Produce 100% of policies, strategies and procedures to approved templates within agreed timescales during 2010/11
2 • Identify and deliver a full research programme by 31/03/2011
Service standards
• We will produce an annual service plan for Your Homes Newcastle during 2010/11
• We will produce an organisational wide policy briefing every two months during 2010/11
• We will review all service standards on an annual basis during 2010/11
66 67
Ref
The targets below are monitored on a monthly basis through the Service
Improvement Programme
Strategy target
6 • Complete a review of the YHN Risk Management Strategy by
31/03/2011
The actions below contribute to achieving all of the above targets
Team actions
8 • Develop all business cases agreed by management team during 2010/11
7 • Ensure all Neighbourhood Services SLA’s have a robust management
structure by 31/03/2011
9 • Complete review of the tenancy handbook by 30/06/2010
9 • Complete review of Highways SLA by 31/10/2010 G
R
Directorate: BusinessTeam: Investment Delivery
• Delivery of all aspects of the YHN Investment Programme
• Commissioning of YHN Investment Delivery including procurement, delivery and cyclical repairs such as painting programmes
• Consultation with residents and stakeholders on programmes and the business plan
• Resident consultation and support services for each project
• Affordable Warmth, Newcastle Warm Zone and Home Energy Conservation Act strategy and delivery
• Project management of regeneration schemes and programmes
• Commissioning and delivery of adaptations for people in council housing
• Involvement in induction for YHN staff
• Developing new regeneration schemes
• Relocation of residents as required within regeneration areas
• Identifying and applying for new and existing sources of funding
Key work areas:
The targets below are monitored on a quarterly basis through the service plan monitoring programme
YHN Top 20 and Wider Management Team targets
4 • 6869 homes to made decent in 2010/11
2 • Achieve 93% satisfaction with the externals investment programme by 31/03/2011 (also service standard)
2 • Achieve 85% satisfaction with the internals investment programme by 31/03/2011 (also service standard)
4 • 97% of Modern Homes spend to come within budget during 2010/11
Service standards
Investment Delivery:
• We will always write to tell you about any work we are planning for your home at least three months before work is due to start during 2010/11
• We will always hold an information event before we start work on your estate under the Modern Homes Programme during 2010/11
• During 2010/11 we will carry out customer satisfaction surveys on your estate during the Modern Homes work
Ref
P
O
68 69
Ref
Equality and Diversity targets
8 • Investigate communication methods with BME groups by 31/12/2010
5 • Complete all CRE actions within the CRE action plan on time during 2010/11
The actions below contribute to achieving all of the above targets
Team actions
2 • Produce quarterly satisfaction reports on the Modern Homes Programme to Performance Committee during 2010/11
6 • Carry out a review of the Investment Delivery Team by 31/03/2011
9 • Deliver three pilot estates through NEP by 31/12/2010
9 • Investigate the option of re-charging tenants for non access for Modern Homes work by 31/12/2010
9 • Investigate the possibility of providing a chargeable adaptations service to other housing organisations by 31/03/2011
Ref
Y
B
G
O
• During 2010/11 we will carry out a customer satisfaction survey within three months of the estate being finished on all of our completed schemes to assess the quality of the work and service. We will let you know what we have found and what we are going to do about any problems
• We aim for 85% of our customers to be satisfied with internal work we have done on the Modern Homes Programme during 2010/11
• We aim for 93% of our customers to be satisfied with the external work we have done on the Modern Homes Programme during 2010/11
Adaptations:
• We will send a welcome letter to all of our new clients within 28 working days of receiving a referral from Adult and Culture Services during 2010/11
• We aim to achieve at least 90% customer satisfaction for the work carried out to customers’ homes’ during 2010/11
Resettlement and Relocation:
• We will contact you within 20 working days of receiving a referral during 2010/11
• We will agree with you how often we will update you about your move during 2010/11
• When you have accepted another property, we will contact you within two working days to organise your move during 2010/11
• We will contact you within five working days after your move to sort out any problems you may have during 2010/11
Team targets
2 • Carry out interim customer satisfaction surveys within six weeks of a scheme starting throughout 2010/11. The result will be discussed in site meetings to continually improve constructors performance
4 • 8354 improvement packages to be delivered during 2010/11
8 • Re-house 270 households on the Riverside Dene project by 31/03/2011
8 • Achieve 85% customer satisfaction from tenants who are re- housed during 2010/11
8 • Achieve five sources of external funding during 2010/11
70 71
Directorate: Business Team: Organisational Development
• Support staff and managers in identifying and prioritising team and individual learning and development needs
• Plan, develop, deliver and commission appropriate learning and development responses to prioritised needs
• Manage, monitor, review and report on learning and development activities to demonstrate return on investment
• Design and facilitate the implementation of organisational development and initiatives
• Ensure all learning and development activities are aligned to business need
Key work areas:
The targets below are monitored on a quarterly basis through the service plan monitoring programme
YHN Top 20 and Wider Management Team targets
3 • Implement a staff competency framework by 31/10/2010
3 • Achieve North East Better Health at Work silver award by 31/12/2010
Wider Management Team
3 • In partnership with the HR Team implement actions by deadlines outlined with the YHN People Strategy
Service standards
• We will produce and advertise a learning and development prospectus by 31/03/2011
• We will send joining instructions to all learners who have an advanced booking on a training programme within 10 working days of the internal course date. We aim to do this for 96%.
• We will work with managers to develop annual team learning and development plans for all service areas by 31/07/2010
• We will develop an annual learning and development plan for YHN Board members by 31/07/2010
Team targets
3 • Involve 15% of staff in Adult Learners Week by 21/05/2010
9 • Carry out one research programme utilising local university students during 2010/11
9 • 10% of staff to participate in Safeguarding Adults training by 31/03/2011
Ref
Ref
Equality and Diversity targets
8 • Introduce a range of learning opportunities around the six strands of equality by 31/03/2011
5 • Complete all CRE actions within the CRE action plan on time during 2010/11
12 • Complete an EINA on the YHN Leadership and Development Strategy by 31/12/2010
The actions below contribute to achieving all of the above targets
Team actions
3 • Update our learning and development calendar/intranet pages in June 2010, September 2010 and December 2010
9 • Launch revised appraisal paperwork and procedure in line with the staff competence framework by 30/06/2010
9 • Produce quarterly learning and development evaluation reports during 2010/11
9 • Gain national accreditation (OCN credit4learning) for two areas of core business learning and development by 30/09/2010
9 • Review and implement YHN Management Charter by 30/09/2010
P
Pi
O
Y
B
G
72 73
Directorate: Business Team: Customer Involvement
• Develop a wide range of good quality and effective involvement and feedback methods
• Support other service areas to make YHN a customer - focused organisation where customers drive forward service improvements
• Ensure that involved customers are representative of the YHN customer base
• Deliver a structured programme of positive activities
Key work areas:
The targets below are monitored on a quarterly basis through the service plan monitoring programme
YHN Top 20 and Wider Management Team targets
2 • Achieve 89% satisfaction with involvement services from involved customers by 31/3/2011
2 • Agree local standards with tenants for the service areas outlined by the TSA by 31/3/2011
Wider Management Team targets
2 • Make sure the database of ‘make a difference’ volunteers is representative of the tenant population in terms of age, gender, ethnicity, disability, religious beliefs and sexual orientation by 31/03/2011 (also service standard)
2 • Meet the requirements set out by the TSA to agree and publish an approach to working with tenants to agree local standards for services by 01/10/2010
Service Standards
• We will respond to request for advice and support on involvement activity within three working days
• We will feedback to services any issues raised from involvement within two weeks of the activity taking place
• We will contact services six months after involvement activity to request progress against actions identified
• We will contact services once a year to identify their involvement needs. This will ensure involvement priorities are aligned to organisational priorities in addition to meeting customer priorities
Ref
Ref
• Make sure the database of ‘make a difference’ volunteers is representative of tenant population in terms of age, gender, ethnicity, disability and sexual orientation by 31/03/2011 (also WMT target)
• We will deliver 100 involvement activities by 31/03/2011
Team targets
2 • Deliver 10 service user workshops during 2010/11
2 • Deliver six mystery shopping exercises during 2010/11
8 • Monitor improvements to services in relation to involvement activity outcomes on a quarterly basis during 2010/11
2 • Feed back outcomes to 99% of participants from involvement events held during 2010/11
The targets below are monitored on a monthly basis through the Service Improvement Programme
Strategy target
6 • Work in collaboration with NCC to complete a review of the Tenant and Leaseholder Involvement Strategy 31/12/2010
The actions below contribute to achieving all of the above targets
Team actions
1 • Acquire £10,000 income for diversionary/leisure activities by 31/03/2011
1 • Deliver eight different positive activities for tenants by 31/03/2011
8 • Comply with the TSA standard on tenant involvement and empowerment by 31/03/2011
9 • Carry out a review of venues used for events to identify potential savings by 31/03/2011
9 • Investigate the possibility of improving the current customer involvement database to improve quality of information and effectiveness by 31/03/2011
P
Pi
O
Y
O
R
G
74 75
Ref
Communications:
• We will produce and deliver Homes + People four times each year to every tenant and leaseholder during 2010/11
• We will produce 10 editions of ‘Rewind’ , our internal newsletter for staff, during 2010/11
• We will agree a timescale for the design and production of printed materials within five working days of accepting a request during 2010/11
• We will inform you of the timescale for the translation of a document within four working days of accepting a request during 2010/11
• Achieve £200,000 advertising value equivalent of positive media coverage during 2010/11
• We will review all pages on www.yhn.org.uk for accuracy twice during 2010/11
The Communications team will action requests reported to [email protected] within the following timescales during 2010/11:
• All requests for basic content update or addition to an existing page will be responded to within five working days
• Development of an existing page or a new page, or a request that involves re-structuring information, adding links or several new documents: we will agree a timescale on a job by job basis up to a maximum of 10 working days
• All requests for urgent corrections or deletions will be responded to within two working days
Team targets
1 • Carry out specific targeted activity to Young People and the LGB community by 31/03/2011 to promote Board Membership opportunities
2 • Carry out 98% of planned organisation wide telephone monitoring during 2010/11
2 • Type and circulate Divisional SMT minutes within five working days during 2010/11
8 • Provide translated information or material in alternative formats within 10 days of request during 2010/11
2 • Ensure key performance data is published in Homes and People twice during 2010/11
Directorate: Chief Executives Office Team: Chief Executives Office
The Chief Executive’s Office incorporates the following functions: management support and executive assistance, equalities and diversity, company administration and board support and communications. We:
• Assist the Chief Executive and Management Team in the delivery of executive projects
• Facilitate and develop the organisations decision making processes
• Make sure that effective Governance processes and procedures are in place
• Ensure compliance with all statutory requirements relating to governance
• Provide Board/Area support and manage the support provided to committees through Service Level Agreements
• Provide administration and secretarial support to Management Team and Board as required
• Provide general and specialist advice to internal and external customers
• Manage and maintain effective data information systems
• Develop a wide range of good quality and effective communications
• Support internal and external customers to make YHN a customer - focused organisation where customers drive forward service improvements
• Organise events on behalf of YHN
Equality and diversity key work areas are provided in the separate service plan for the Equality and Diversity Team
Key work areas:
The targets below are monitored on a quarterly basis through the service plan monitoring programme
Wider Management Team targets
2 • Achieve a 15% increase in traffic to the YHN website by 31/03/2011
8 • Hold the first AGM for Leazes Homes during 2010/11
Service standards
Management Support:
• We will achieve 90% internal customer satisfaction during 2010/11
• Respond to 95% of management team correspondence within 10 working days during 2010/11
Board Support:
• Distribute Board papers within one week of the meeting taking place during 2010/11
Ref
Pi
O
O
Y
76 77
Ref
Equality and Diversity targets
8 • Ensure that images of BME, LGBT and disabled senior staff and customers are used within promotional material to promote role models during 2010/11
12 • Complete an EINA on the YHN Communications Strategy by 31/03/2011
The targets below are monitored on a monthly basis through the Service Improvement Programme
Strategy targets
6 • Complete a review of the YHN Communications Strategy by 31/03/2011
The actions below contribute to achieving all of the above targets
Team actions
2 • Review the Democratic Services SLA with NCC by 31/03/2011
8 • Meet quarterly with Homes and People Editorial Board to ensure tenants and leaseholders make a recognised contribution to the newsletter during 2010/11
2 • Pass on 97% of complaints to the central team within one working day during 2010/11
3 • Deliver eight Team Briefs to staff in 2010/11
8 • Produce an Annual Report for Leazes Homes by 31/10/2010
8 • Review the range of options available for customers with additional communications needs to access information by 31/03/2011
9 • Develop a database of all officers within the organisation who can provide additional voluntary and emergency communication assistance by 31/03/2011
9 • Provide a preference for tenants and leaseholders to opt out of receiving Homes and People by post where they have access to email by 31/03/2011
2 • Work with the YHN IT to review the potential use of social networking websites and, subject to funding, implement at least one new initiative by 31/03/2011
1 • Develop an employment page on the YHN website to facilitate the greater provision of information for people who want to get back into work or training by 31/03/2011
B
R
G
• Ensure that all equality and diversity responsibilities of the organisation are met
• Lead on mainstreaming the equality and diversity agenda within YHN with specific reference to:
• Equality Framework for Local Government
• Audit Commission Diversity KLOE
• CRE – Code of practice on Racial Equality in Housing
• Compliance with all equalities legislation
• Act as lead on the Corporate Equality Plan project within YHN’s Service Improvement Programme
Key work areas:
The targets below are monitored on a quarterly basis through the service plan monitoring programme
YHN Top 20 and Wider Management Team target
8 • Meet the ‘achieving’ level of the Equality Framework for Local Government by 30/06/2010.
Wider Management Team target
8 • Adopt the key features of the Public Sector Equality Duty contained within the new Single Equality Act by 31/01/2011
Service standards
Internal:
• Deliver an equality and diversity induction module to all new YHN staff during 2010/11
• Provide advice and assistance to all staff on all equality and diversity issues within three working days of receiving the request during 2010/11
• When there are changes in equality and diversity legislation that effect YHN policy and procedures we will brief all staff before changes take effect during 2010/11
External:
• Work with the Strategic Independent Advisory Group (SIAG) to agree an annual work plan during 2010/11
Ref
Directorate: Chief Executives Office Team: Equality and Diversity
Y
P
Pi
O
78 79
Ref
• Annually review the Disability Action Plans (DAPS) for all our workplaces during 2010/11 to make sure that access to our services meets the different needs of our diverse communities
• Attend and take part in at least three meetings of the Housing Diversity Network Bench Marking Club during 2010/11
Team targets
10 • Ensure that all Corporate Equality Plan targets for 2010/11 are achieved by 31/03/2011
10 • Produce a statement of compliance with the CRE code of practice on activities undertaken by 31/03/2011
2 • Produce and publish an Equality and Diversity Annual Report of all activities undertaken during 2009/10 by 31/05/2010
10 • Monitoring and continuous Improvements are reported at least six monthly to Board/SMT/Staff and stakeholders
1 • Review DAPS processes to ensure that our services meet the different needs of our diverse communities by 31/3/2011
The actions below contribute to achieving all of the above targets
Team actions
9 • Explore the possibility of introducing a virtual forum via email for SIAG members by 30/06/2010
1 • Carry out six monthly review of all DAPS Statements during 2010/11
10 • Attend at least three equality and diversity conferences/ workshops and three benchmarking meetings during 2010/11
7 • Participate in at least three events to celebrate significant cultural events such as Refugee Week, Pride etc. during 2010/11
2 • Hold two activities to target harder to reach groups and promote consultation during 2010/11
12 • Complete an EINA on the YHN Corporate Equality Plan by 31/12/2010
5 • Complete all CRE actions within the CRE action plan on time during 2010/11
Y
O
G
Administration:
• Provide general and specialist information and advice to internal and external customers
• Manage the room booking and catering functions for YHN House
• Assist the work of YHN through the provision of clerical, administrative and support functions
• Manage and maintain effective data information systems in relation to PRI’s, incident and accident reporting
• Provide statistical and management information to management teams and in line with statutory requirements
Facilities Management:
• Arrange and manage planned and responsive maintenance to YHN House and grounds
• Arrange and manage planned and responsive cleaning within YHN House
• Deliver a daily courier service
• Collect and recycle materials
Key work areas:
The targets below are monitored on a quarterly basis through the service plan monitoring programme
Service standards
Administration:
• We will provide a reception service at YHN House between 8.15am and 5pm each working day during 2010/11
• We will collect and deliver the internal post at YHN House twice each working day during 2010/11
• We will input 97% of flexi adjustments within two working days of receiving the adjustment form during 2010/11
• We will issue a minimum of 97% of weekly flexi reports to section managers within five working days of the end of the flexi period during 2010/11
• We will respond to a minimum of 96% of admin pool request forms within two working days during 2010/11
• We will order 95% of uniforms within two working days of uniform fittings taking place during 2010/11
Ref
Directorate: Finance and Resources Team: Administration and Facilities
O
80 81
Ref
• We will confirm buffet requests within one week prior to the date of the buffet being required. We aim to do this for at least 95% of bookings during 2010/11
• We will process 96% of travel/accommodation requests within two working days during 2010/11
• We will enter a minimum of 98% of PRI forms onto the Northgate system within two working days during 2010/11
• Carry out 98% of planned organisation wide telephone monitoring during 2010/11
• We will respond to 96% of YHN leaflet requests within two working days during 2010/11
Facilities:
• We will provide a daily courier service for YHN House, decentralised teams and the Civic Centre on each working day. We aim to do this at least 98% of the time during 2010/11
• 99% of goods received at YHN House bearing a name or section will be delivered to the recipient within one working day during 2010/11
• We will review the security of YHN House and all service contracts on an annual basis during 2010/11
Team targets
13 Facilities Management:
• Provide a daily recycling collection service for YHN House and decentralised services. 98% target during 2010/11
3 • 96% for completion of a health and safety review of YHN House and the grounds twice each day during 2010/11
Equality and Diversity targets
1 • Review DAP for YHN House by 31/03/2011
12 • Complete an EINA on the YHN Access to Information Policy by 31/03/2011
The actions below contribute to achieving all of the above targets
Team actions
8 Facilities Management:
• Investigate options of expanding the Facilities Management service to provide repairs and maintenance to satellite YHN offices by 31/07/2010
8 • Investigate options of introducing an online repairs reporting form accessible to all Facilities Management staff and use of ‘blog’ style feedback for other issues by 31/10/2010
O
Y
B
G
Directorate: Finance and Resources Team: Financial Business Support
Key work areas:
• Interface with Newcastle City Council (NCC) on technical finance issues
• Prepare financial information for Housing Revenue Account (HRA) and YHN Business and Medium Term plans
• Monitor and report timely, accurate and robust financial information relating to the HRA Capital Investment Programme and provide financial support and advice to enable decisions to be made at the earliest opportunity in order that the programme can be delivered within agreed financial constraints so as to minimise the impact on HRA Reserves.
• Prepare YHN and HRA statutory accounts for submission in accordance with statutory deadlines.
• Liaise with the Company’s external auditors to ensure there is no qualification of the accounts
• Prepare and submit HRA Subsidy returns and Prepare Supporting People performance returns and maintain and maintain Supporting People financial information
• Provide a financial and business planning consultation service including taxation issues
• Prepare and submit statistical data to external organisations
• Carry out assessment and appraisal of consultations affecting the HRA and ALMO finance
• Co-ordinate grant claims and procedures
• Interface with NCC on technical finance issues
• Prepare financial information for HRA and YHN Business and Medium Term plans
• Financial Support to Leazes Homes, Investment Appraisals and Financial Statements
82 83
Ref Ref
The targets below are monitored on a quarterly basis through the service plan monitoring programme
Wider Management Targets
2 • Maintain a minimum HRA balance of £5 Million by 31/03/2011
2 • Access additional sources of funding to raise £500k by 31/03/2011
2 • Leasehold Service Charges for 2009/2010 actual costs will be invoiced at a block level by July 2010
Service Standards
• Provide an investment programme monthly monitor for managers during 2010/11
• Provide revenue and investment reports for YHN Finance and Resources committee in line with their timetable during 2010/11
• Process Right to Buy cost floor calculations within 15 working days of receiving the request during 2010/11
• Produce audited YHN annual financial statements for the YHN annual general meeting during 2010/11
Team targets
2 • HRA Subsidy 2010/11 claims to be submitted to the Department of Communities and Local Government timetable and without subsequent amendment of value greater than £420,000
2 • To investigate accountancy actions within the month (95% for red and 90% for non-red flags), during 2010/11 for the NCC Budget Monitoring Tool for HRA and YHN budget holders.
8 • Provide budgeted Leasehold charges to the Income Team by 28/02/2010
8 • Provide actual Leasehold charges to the Income Team by 31/07/2010
8 • Provide 100% of requested Leasehold statements within statutory deadlines during 2010/11
Equality and Diversity targets
12 • Complete an EINA on the YHN Finance Strategy by 30/6/2010
12 • Complete an EINA on the YHN Efficiency Strategy by 30/6/2010
The targets below are monitored on a monthly basis through the Service Improvement Programme
Strategy actions
6 • Complete a review of the YHN Finance Strategy by 30/6/2010
6 • Complete a review of the YHN Efficiency Strategy by 30/6/2010
The actions below contribute to achieving all of the above targets
Team actions
17 • Produce YHN and HRA company accounts to auditor’s timetable and without auditor’s qualification during 2010/11
2 • Answer all S151 technical issues raised at S151 meetings to NCC satisfaction prior to next meeting during 2010/11
2 • Produce NCC specified financial information for the 30 year HRA Business Plan by 31/03/2011
16 • Explore more grant opportunities through the active use of grant finder etc. by 31/03/2011
16 • Set up statutory accounts for Leazes Homes by to auditor’s timetable and without auditor’s qualification during 2010/11
B
R
Y
Pi
O
G
84 85
Directorate: Finance and Resources Team: Finance Procurement and Payments
Key work areas:
Ref
Ref
within 15 working days of receipt during 2010/11
9 • All request for tender/quotation to be sent to potential supplier within four working days during 2009/10
9 • Notify staff within two weeks following any changes to the procurement/Pop’s procedure during 2010/11
Equality and Diversity Targets
8 • Promote equality of opportunity within the procurement process by engaging with at least one group who traditionally may not have supplied to us, by 31/03/2011
12 • Complete an EINA on the YHN Finance Strategy by 30/06/2010
12 • Complete an EINA on the YHN Efficiency Strategy by 30/06/2010
12 • Complete an EINA on the YHN Procurement Strategy by 30/09/2010
The targets below are monitored on a monthly basis through the Service Improvement Programme
Strategy targets
6 • Complete a review of the YHN Finance Strategy by 30/06/2010
6 • Complete a review of the YHN Efficiency Strategy by 30/06/2010
6 • Complete a review of the YHN Procurement Strategy by 30/09/2010
The actions below contribute to achieving all of the above targets
Team actions
8 • Monitor and report Corporate Procurement Strategy action plan to Finance and Resources Committee, according to committee requirements, during 2010/11
2 • Deliver 90% of reviews / procurements of externally delivered services as recommended by annual spend analysis during 2010/11
2 • Deliver at least one procurement through collaborative working with Procurement Champions from NCC Corporate Business Management during 2010/11
2 • Implement and promote the availability, to all suppliers, of the pro-contract e-tendering system, to improve electronic communication and information on contracts and tenders, by 30/09/2010.
Pi
R
G
B
• Enable staff and managers to procure correctly on behalf of YHN and the HRA by developing, implementing and maintaining effective systems and processes and ensuring adherence to financial regulations, including appropriate UK and EU procurement legislation
• Maintain the procurement/contract database and carry out corporate procurements
• Act as the gatekeeper in the procurement process.
• Co-ordinate the closedown of financial systems to enable the preparation of the year end accounts in accordance with statutory deadline and codes of practice
• Develop and deliver financial training courses for staff and managers relating to POPS, financial regulations and procurement
• Support staff and managers with all payment related services.
The targets below are monitored on a quarterly basis through the service plan monitoring programme
Wider Management Team Target
2 • Maintain a minimum HRA balance of £5 million by 31/03/2011
Service Standards
• Train 95% of new staff and supply security access to the POP system within two weeks of being notified of their FAMIS login during 2010/11
• Petty cash will be available between the hours of 08:30 and 16:30 on each working day during 2010/11, subject to the appropriate approvals and notice being given.
• POP query support will be available between the hours of 08:30 and 16:30 on each working day during 2010/11
Team targets
9 • 96% of invoices to be paid on time during 2010/11
11 • Comply with NCC’s statutory deadlines for closure of 2009/10 accounts during 2010/11
9 • Confirmation orders to be kept to 10% or less of total orders raised during 2010/11
9 • 95% of authorised contracts to be sent to supplier/service manager
O
Y
Y
86 87
Directorate: Finance and Resources Team: Finance Revenue
• Produce, revise and monitor an annual budget complying with statutory deadlines and codes of practice
• Implement a five year medium term financial planning process to help plan the effective application of resources to meet YHN’s objectives
• The preparation and production of revenue YHN and HRA budgets and the Medium Term Plan including agreement of the YHN Management Fee
• Production of quarterly Revenue Budget Monitor to Finance and Resources Committee and the NCC Director of Resources (S151)
• Monthly budget monitoring of all revenue budget heads and support to all budget managers, via the Budget Monitoring Tool, including quarterly reporting on performance to WMT
• Review and updating of medium term financial information for service business plans
• Monthly monitoring and reconciliation of YHN Payroll and maintenance of YHN establishment.
• To support the revision of the Efficiency Strategy and to support the monitoring of the Action Plan, reporting to Finance and Resources committee
• To support and drive the Business and Financial Planning process
• To support the implementation of Single Status Phase 2
Key work areas:
The targets below are monitored on a quarterly basis through the service plan monitoring programme
YHN Top 20 and Wider Management Team Target
8 • Achieve 3% efficiency saving on 2008/09 baseline budget by 31/03/2011
Wider Management Team Target
2 • Maintain a minimum HRA balance of £5 million by 31/03/2011
Ref
Ref
Service Standards
• Provide revenue budget monitoring reports for YHN Finance and Resources committee in line with their timetable during 2010/11
• Provide bi-monthly revenue budget monitors for managers during 2010/11, within 10 working days from the 1st of the month
• Provide six monthly Financial updates to managers with Service Business Plans (January and June) during 2010/11
• Car Allowance Insurance Documents; send a reminder to appropriate staff one month before date of expiry
Team Targets
2 • Achieve 97% accuracy of YHN Management Fee expenditure, revised outturn budgets to actual during 2010/11
2 • Achieve 97% accuracy of HRA supervision and management expenditure revised outturn budgets to actual during 2010/11
8 • Agree YHN management fee with NCC Director of Finance and Resources on a quarterly basis (recorded in S151 minutes)
2 • To investigate accountancy actions within the month (95% for red and 90% for non-red flags) during 2010/11 for the NCC Budget Monitoring Tool for HRA and YHN budget holders.
8 • Single Status Phase 2 : to accurately reflect the results of SS PH 2 into budgets within three months of implementation during 2010/11
8 • To monitor and report on the implementation of the Efficiency Strategy Action Plan to Finance and Resources committee on a six monthly basis during 2010/11
Equality and Diversity Targets
12 • Complete an EINA on the YHN Finance Strategy by 30/06/2010
12 • Complete an EINA on the YHN Efficiency Strategy by 30/06/2010
The targets below are monitored on a monthly basis through the Service Improvement Programme
Strategy actions
6 • Complete a review of the YHN Finance Strategy by 30/06/2010
6 • Complete a review of the YHN Efficiency Strategy by 30/06/2010
P
Pi B
R
Y
O
88 89
Ref
The actions below contribute to achieving all of the above targets
Team actions
11 • Produce, revise and monitor an annual budget complying with statutory deadlines and codes of practice, during 2010/11
2 • Implement a five year medium term financial planning process to help plan the effective application of resources to meet YHN’s objectives, during 2010/11
2 • Answer all revenue issues raised at S151 meetings to NCC satisfaction prior to next meeting during 2010/11
11 • Comply with NCC statutory deadlines for closure of accounts during 2010/11
2 • Support Business and Financial Planning, providing support with all aspects relating to finance, during 2010/11
8 • Investigate options of providing seminars on household budgeting to schools and tenants groups by 31/03/2011 G
Directorate: Finance and ResourcesTeam: Human Resources
Develop and implement company HR policy and strategy. We monitor and evaluate the delivery of HR services, including:
• recruitment and selection• conditions of service/single status• employee welfare/absence management• employment law• employee relations• advice and research• workforce planning strategies• HR information systems/DHS• 360 degree feedback
Key work areas:
The targets below are monitored on a quarterly basis through the service plan monitoring programme
YHN Top 20 and Wider Management Team target
3 • Reduce number of sickness absence days per full time equivalent to 9.6 days by 31/03/2011
Wider Management Team target
3 • In partnership with the OD Team implement actions by deadlines outlined with the YHN People Strategy
Service standards
• Provide advice and coaching to managers on sickness absence reviews when requested within three working days during 2010/11
• Review all long term sickness cases that have been referred to occupational health with the OHS doctor on a monthly basis during 2010/11
• Provide advice and coaching to managers on disciplinary issues when requested within one working day of receiving the request during 2010/11
• Provide advice on policy and procedures to all staff within three working days of receiving a request during 2010/11
• In receipt of a completed (signed off) vacancy notification we will take the necessary action within three working days during 2010/11
• All shortlisted recruitment candidates will be sent a conditional, unsuccessful or holding letter within five working days of receiving the information from the recruiting manager during 2010/11
• Update organisational charts and circulate to service managers on a monthly basis during 2010/11
Ref
P
Pi
O
90 91
Ref
Team target
8 • Increase the number of job application packs sent electronically from 48% to 58% by 31/03/2011
Equality and Diversity targets
12 • Complete an EINA on the YHN Absence Policy by 31/03/2011
12 • Complete an EINA on the YHN Recruitment and Selection Policy by 31/03/2011
12 • Complete an EINA on the YHN Retirement Procedure (including the Flexible Retirement Procedure) by 31/03/2011
5 • Complete all CRE actions within the CRE action plan on time during 2010/11
The actions below contribute to achieving all of the above targets
Team actions
8 • Skill the HR team to enable 95% of psychometric testing to be administered in house by 31/03/2011
8 • Review current recruitment process by 30/11/2010
8 • Develop a suite of bespoke HR information on a dedicated web page by 31/03/2011
B
G
Y
Directorate: Finance and ResourcesTeam: Income
Income Team:
• Delivering excellent services by providing a rental administration service to approximately 28,500 tenants and 1,500 leaseholders
• Complying with Government policies and codes of practice such as Rent Reform and Convergence
• Reconciling weekly/annual balance of rent accounts and income received
• Developing and maintaining the rents and service charges module of the Northgate system
• Providing accurate and effective advice and information to customers
• Produce rent and service charge estimates, budget monitors and year end accounts
• Prepare income and arrears monitor to Finance and Resources Committee and NCC Director of Finance and Resources [S151]
• Liaise with NCC and District Auditors
• Maximise income by providing and administering a variety of cost effective payment methods
• Promote the benefits of Home Contents Insurance and administer YHN Home Contents Insurance scheme
Debt Recovery Team:
• Manage the recovery of YHN debt including:
• Former Tenant Arrears
• Leaseholders Rent, Service Charges and Major Works
• Re-chargeable works
• Develop new debt recovery services through working with partners and outside agencies
Key work areas:
92 93
Ref Ref
The targets below are monitored on a quarterly basis through the Service plan monitoring programme
Wider Management Team targets
2 • Contribute to achieving a minimum HRA Balance of £5 million by 31/03/2011
2 • Collect £400k of Former Tenants Arrears during 2010/11
2 • Collect 97% of leasehold service charges during 2010/11
2 • Collect 80% of leasehold major works invoices during 2010/11
Service standards
Income Team:
• We will authorise NCC to issue a refund within five working days of receiving a refund request during 2010/11
• We will issue a new swipe card within 10 working days of receiving the request during 2010/11
• We will recalculate rents within five working days of being notified of any changes during 2010/11
• We will send you a quarterly statement detailing transactions on your rent account during 2010/11
• We will provide the facility to view your rent account or make a payment online during 2010/11
• We will forward written confirmation of Home Contents Insurance within 10 working days of the requested start date during 2010/11
• We will provide a schedule of payments to all customers who pay by direct debit and will ensure that at least 10 working days notice is given for any changes to payments during 2010/11
Debt recovery:
• We will contact you within a maximum of 14 working days of you being referred to the service during 2010/11, to discuss your outstanding debt
• All members of the team conducting visits will carry an authorised identity card, which will be shown on arrival, during 2010/11
• We will always ask you to sign and agree all payment plans during 2010/11
• We will send you confirmation once the debt is paid in full within 10 working days
Team targets
1 • Increase the percentage of tenants who have a home contents insurance policy to 28% by 31/03/2011
11 • Deliver rent increase notifications to tenants by the statutory deadline (07/03/2011)
2 • Charge approved rent and service charge levels from the first Monday in April (04/04/11)
2 • Increase the number of direct debit payers by 550 during 2010/11
Equality and Diversity targets
12 • Complete an EINA on the Income Management Strategy by 31/10/2010
5 • Complete all CRE actions within the CRE action plan on time during 2010/11
12 • Contribute towards the completion of an EINA on the YHN Finance Strategy by 30/06/2010
The targets below are monitored on a monthly basis through the Service Improvement Programme
Strategy targets
6 • Complete a review of the Income Management Strategy by 31/10/2010
6 • Contribute towards the completion of a review of the YHN Finance Strategy by 30/06/2010
The actions below contribute to achieving all of the above targets
Team actions
2 • Review the Exchequer Services Income SLA by 30/09/2010
11 • Calculation of rent and service charges within the Governments Rent Reform and Convergence Guidelines during 2010/11
2 • Ensuring all rental income collected is allocated and reconciled correctly. Providing 6 weekly reports on this to YHN Finance and Resources Committee during 2010/11
2 • Complete a Rent and Service Charge Setting Policy by 30/09/2010
2 • Produce and publicise a procedure document detailing how we will keep our tenants informed of changes to rent and service charges by 30/09/2010
8 • Carry out two targeted campaigns to promote direct debit payment and two targeted campaigns to improve debt collection during 2010/11
O
B
R
G
PiY
94 95
Directorate: Finance and Resources Team: Right to Buy
Directorate: Finance and Resources Team: YHN IT
We provide tenants an affordable opportunity to become home owners by:
• Administering the Right To Buy process• Providing statistical and management information to management teams in
line with statutory requirements• Providing general and specialist information and advice to internal and external
customers• Resolving conflicts that arise from the Right To Buy process• Providing Right To Buy and technical property Information• Interpreting current legislation and developing procedures in line with this
• Operate a service desk to provide help and advice on the use of the Northgate housing management system and other IT systems
• Ensure that third party organisations (including Newcastle IT) with responsibility for second and third line support meet their obligations to our customers
• Provide support to YHN services in defining the requirements for changes to the service they receive from us
• Provide advice, project management and technical support for changes to the Northgate system and other IT services, and for the procurement and implementation of new IT services
• Support the testing of all system changes, prior to release
• Procure IT hardware and software, including inventory and licensing arrangements
• Manage upgrades and other infrastructure changes
• Administer Outlook accounts and control access to the network and shared folders
• Build and maintain standard reports from the Northgate system, and ad-hoc reports for individual services when needed
• Ensure that the Northgate system and other core IT services is available and fit for purpose
• Provide technical support to OD for the training of end-users in the use of the system
• Work with Newcastle IT and other suppliers to ensure that their services meet the needs of our customers
• Maintain appropriate levels of knowledge and skills through training, and attendance at Northgate user groups and other events
• Monitor and manage elements of the IT Service Level Agreement with Newcastle IT
• Develop the YHN IT Strategy and governance policies for IT-enabled change
Key work areas: Key work areas:
Ref
Y
O
B
G
The targets below are monitored on a quarterly basis through the service plan monitoring programme
Team targets
2 • Achieve 96% compliance with statutory timescales during 2010/11 9 • Turn around 96% of property valuations within 10 days during 2010/11 2 • Achieve customer satisfaction of 80% by 31/03/20112 • No successful Right to Buy 6’s and 8’s served during 2010/11
Service Standards
• Where all information is available, we will send RTB2 notices to at least 96% of customers within four weeks during 2010/11 • Following an RTB2 notice, we will send offer notices to 96% of customers: • within eight weeks from the date of the RTB2 if you are buying a freehold property (normally a house) during 2010/11; or • within 12 weeks from the date of the RTB2 if you are buying a leasehold property (normally a flat or maisonette) during 2010/11 • We will respond to 100% of customers who have sent us an initial notice of delay form within one calendar month during 2010/11
Equality and Diversity target
12 • Complete an EINA on the YHN Buyback Policy by 30/09/2010
The actions below contribute to achieving all of the above targets
Team actions
9 • Review Legal Services SLA charges and explore the possibility of being charged per application, by 31/03/2011 9 • Review Property Services SLA by 31/03/2011 8 • Implement procedures to process Right to Acquire applications by 31/03/20119 • Monitor the number of days taken to return valuations on a quarterly basis during 2010/11
96 97
Ref
• Block a website
• Provide critical advice and guidance
Within two working days, we will:
• Restore an email mailbox
• Unblock a website
Within five working days, we will:
• Install a standard desktop application onto a PC or laptop
• Install a new peripheral device
• Restore files or folders from backup
• Upgrade a PC or laptop (e.g. install new memory)
• Provide general advice and guidance
• Book IT equipment from the loan pool (subject to availability)
• Complete purchase orders for other IT Equipment
• Complete administrative tasks relating to email, corporate network, internet
Within 10 working days, we will:
• Order and install new networked PC or laptop (including standard desktop applications)
• Carry out patch changes and associated tasks on Northgate Housing
• Correct Rent data between Northgate Housing and Revenues and Benefits (3P Rent File issues)
Change requests:
Within 10 working days, we will:
• Complete a standard report request using information from Northgate Housing
• Agree a delivery date for any other change request
Ref
The targets below are monitored on a quarterly basis through the service plan monitoring programme
Wider Management Team targets
2 • Project delivery: 82% of projects (and key milestones) delivered to agreed timescale during 2010/11
6 • Carry out an IT service review by 31/03/2011
Service standards
Incidents:
Within one working day, we will resolve:
• Failure of an online business application such as Northgate Housing or RepairIT
• A virus outbreak or a failure of email or calendar
• Failure of a backup process
• Failure of the corporate network or internet services
• Failure of network folders
• Failure of a Northgate Housing interface
• Any other major hardware failure
Within two working days, we will resolve:
• Failure of a PC, laptop, tablet or PDA
• Failure of standard desktop application (e.g. Microsoft Office)
• Failure of a desktop telephone
Within three working days, we will resolve:
• Failure of a telephone line
• Failure of a printer or other peripheral device
Within 10 working days, we will resolve:
• Data corruption (e.g. following interface failure) requiring a manual datafix
Service requests:
Within one working day, we will:
• Create a new account for email, internet or corporate network
• Reset a password (Northgate Housing, corporate network, internet, SAP etc)
• Release a quarantined email
O
O
O
O
Pi
98 99
Ref Ref
Team targets
2 • 85% overall satisfaction from YHN Services for 2010/11 (measured by snapshot survey in January 2011)
2 • An average rating of “good” or better for individual service desk calls for at least 85% of survey responses during 2010/11
2 • Service levels achieved for 80% of requests and incidents during 2010/11
2 • Change management: 80% of service and system changes delivered to agreed timescale during 2010/11
8 • Reduction of 10% in number of new incidents raised with the service desk over time during 2010/11
Equality and Diversity targets
2 • Investigate options to give additional support to older customers (or other groups who are statistically less likely to have IT experience) who would like to use our online services but lack confidence and/or knowledge, by 31/03/2011
12 • Complete an EINA as part of the IT Service review by 31/03/2011
12 • Provide communal PC’s with internet access in all sheltered housing units by deadline outlined within Service EINA action plan
12 • Investigate the possibility of providing internet access for tenants in their homes and make recommendations to IT Steering Group by deadline outlined within Service EINA action plan
The actions below contribute to achieving all of the above targets
Team actions
8 • Review implementation of configuration management within Service- Now and, if justified, initiate implementation by 30/06/2010
8 • Publish first official version of YHN IT Service Catalogue by 30/06/2010
8 • Publish the YHN Test and Release Policy Statement by 30/06/2010
8 • Begin publishing monthly statistics on service desk and change management targets by 30/06/2010
8 • Publish an IT Security Governance statement by 30/06/2010
8 • Publish policy statements for each ITIL process currently live with YHN IT by 30/06/2010
8 • Implement Business Objects XI (EDGE) by 30/06/2010
8 • Implement improvements to IT programme/project reporting by 30/09/2010
8 • Implement a standard methodology for estimating and reporting effort for application development by 30/09/2010
8 • Create an Informal Learning Policy for YHN IT by 30/09/2010
8 • Implement MOSS infrastructure by 30/09/2010
8 • Implement call management (through NCC) for YHN IT Service Desk by 31/12/2010
8 • Work with the business to evaluate and plan an upgrade to Northgate Housing V6 by 31/12/2010
8 • Begin publishing availability statistics to the business for key IT services by 31/12/2010
8 • Publish guide to building business cases for IT investments by 31/03/2011
8 • Publish a YHN IT Architecture Document by 31/03/2011
8 • Investigate the possibility of providing broadband internet capabilities directly to tenants as a utility (free or subsidised) by 31/03/2011
8 • Rationalise YHN’s printer estate by 31/03/2011
9 • Carry out an audit of software licences by 31/03/2011
8 • Develop and begin publishing telephony stats for Service Desk following implementation of Voice Over IP (VOIP) telephony by 31/03/2011
9 • Implement centralised power-saving technology for desktop PCs by 31/03/2011
8 • Implement automated leavers processing within Service-Now by 31/03/2011
G
GB
Y
100 101
Directorate: Tenancy Services (Care and Support)Team: Advice and Support
We give advice and support to current and prospective tenants around housing and financial issues. We aim to ensure that tenancies are maintained and that prospective tenants succeed in new tenancies.
Key work areas: Ref
Ref
Equality and Diversity targets
12 • Complete an EINA on the YHN Financial Inclusion strategy by 30/06/2010
5 • Complete all CRE actions within the CRE action plan on time during 2010/11
The actions below contribute to achieving all of the above targets
Team actions
2 • Hold an annual Advice and Support Worker service user meeting during 2010/11
9 • Bid for funds from Northern Rock or DWP by 31/03/2011
7 • Produce a minimum of two newsletters during 2010/11
7 • Hold a minimum of four focus group meetings during 2010/11
7 • We will undertake a minimum of four financial awareness training sessions for our tenants during 2010/11
2 • Successfully complete a 12 month review of our Customer Service Excellence award by 31/03/2011
The targets below are monitored on a quarterly basis through the service plan monitoring programme
YHN Top 20 and Wider Management Team target
1 • Achieve 60% level A’s in our Service Quality Framework assessments for Supporting People contracts during 2010/11
Service Standards
• After you are referred to us, we will always arrange to interview you. Our target is to see at least 92% of new customers within 10 working days of you being referred to us during 2010/11
• We will always create a support plan for you. Our target is to do this during the first interview for at least 90% of our customers during 2010/11
• We aim for at least 90% of our customers to be satisfied with staff from the Advice and Support Service during 2010/11
Team targets
8 • Refer at least 50 service users into Newcastle Futures during 2010/11
8 • Revise our support plan process by 31/03/2011
8 • Refer at least 20 service users to Money Made Clear during 2010/11
1 Pathways team:
• 100 service users moved to independent tenancies and supported housing as part of the pathways process during 10/11
1 Outreach team:
• Raise £2,100,000 in charitable grants and additional income from benefits during 2010/11
8 Refugee Move Team:
• Prevent service users from having to access temporary accommodation in at least 90% of cases
P
O
Y
G
B
102 103
Directorate: Tenancy Services (Care and Support) Team: Asylum Seekers Unit
We are a dedicated team who work with a range of partners to provide accommodation and support to people who have claimed asylum and are dispersed to us by the Home Office. We are also commissioned to provide accommodation and support to clients by Adult and Culture and Children’s Services Directorates on referral.
Key work areas:
The targets below are monitored on a quarterly basis through the service plan monitoring programme
Wider Management Team target
6 • Complete service review by 30/09/2010
Service standards
• If you receive support from Adult and Culture Services or Children’s Services, we will provide you with financial support payments every Tuesday morning at the civic centre during 2010/11
• We will always give you a welcome pack which gives you important information about living in Newcastle, including advice about the support that is available to help you. We aim to do this within one working day of you arriving at your first accommodation at least 95% of the time during 2010/11
• We will always arrange for you to be registered with a medical practice if you want us to. We aim to do this within five working days of you arriving at your accommodation at least 95% of the time during 2010/11
• In the first year following arrival into Newcastle we will consult with clients at least twice, to ask how we can continue to improve and develop the services we provide, during 2010/11
• Our staff will visit you at your home to check the property and to see if you have any problems. We aim to do this at least once every four weeks 95% of the time during 2010/11
• We will always outline the details of the Occupancy Agreement. This is a document regarding the use of your accommodation. It outlines the ASU’s responsibilities to you and your responsibility to the ASU and the community in which you live. We aim to do this within one working day of you arriving at your accommodation for all new arrivals during 2010/11
Ref
Ref
Team targets
2 • Maintain 95% customer satisfaction by 31/03/2011
8 • Limit penalties under NECCAS contract with the Home Office to £10K during 2010/11
Equality and Diversity targets
12 • Review ASU satisfaction survey to inform ‘Tackling racism action plan’ by 30/06/2010
8 • Complete all actions in the ASU ‘Tackling racism action plan’ by 31/03/2011
12 • Complete an EINA as part of the ASU Service review by 31/03/2011
5 • Complete all CRE actions within the CRE action plan on time during 2010/11
The actions below contribute to achieving all of the above targets
Team actions
2 • Produce three newsletters for clients during 2010/11
2 • Produce an Annual Report by 31/10/2010
8 • Compliance with Adult and Culture and Children’s Services SLA during 2010/11
2 • Successfully complete a 12 month review of our Customer Service Excellence award by 30/06/2010
O
Pi
B
G
Y
104 105
Directorate: Tenancy Services (Care and Support)Team: Community Care Alarm Service and Sheltered Housing
We provide integrated housing management and mobile warden services for residents of Newcastle. Services are provided to:
• Residents of city council sheltered housing schemes
• Residents of registered social landlord sheltered housing schemes
• Users of the hard-wired alarm systems
• Dispersed alarm users of all tenures
• Vulnerable clients (monitoring only)
We also:
• Complete individual support plans for clients
• Operate Repair Call and Envirocall out of hours services
• Operate 24 hour racist and homophobic incident reporting
• Provide a Jontek ‘Out of Hours’ service
• Carry out lone-worker monitoring for Enterprise 5
• Provide Telecare services to enable people to remain at home and promote independence
• Provide an out of hours housing telephone service
Key work areas:
The targets below are monitored on a quarterly basis through the service plan monitoring programme
YHN Top 20 and Wider Management Team target
1 • Achieve 60% level A’s in our Service Quality Framework assessments for Supporting People contracts during 2010/11
Wider Management Team targets
6 • Complete service review by 30/09/2010
8 • Achieve 5% increase in CCAS/Telecare client growth by 31/03/2011
Service Standards
• We will answer 98.5% of all alarm calls within one minute during 2010/11
• When you need help our Mobile Wardens will come to your home as quickly as possible. We aim to be with customers within 30 minutes for 95% of all alarm calls during 2010/11
• We will complete either a ‘data check’ or a support plan with you depending on your needs. We will do this once during 2010/11, so that the information we use to provide your services is correct and up to date
Ref
Ref
Sheltered housing:
• We will complete a support plan with you once a year, and will review your support plan after six months during 2010/11.
Team targets
2 • Achieve Customer Excellence Standard by 31/10/2010
2 • Achieve 95% user satisfaction during 2010/11
2 Mobile and Telecare Services
• Achieve New Telecare Services Association (TSA) Code of Practice Accreditation 31/12/2010
2 Sheltered Housing Service
• Reduce rent arrears for current tenancies in our sheltered schemes to £19,500 by 31/03/2011
2 • Reduce void re-let times to 35 days by 31/03/2011
2 • Undertake Tenancy Services Authority pilot on developing new service standard for sheltered housing applicants by 31/10/2010
Equality and Diversity targets
5 • Complete all CRE actions within the CRE action plan on time during 2010/11
12 • Complete an EINA as part of the CCAS Service review by 31/03/2011
The actions below contribute to achieving all of the above targets
Team actions
9 • Develop a Telecare stock control system by 31/03/2011
9 • All Sheltered Housing staff within Sheltered Housing Schemes to have access to YHN network by 31/03/2011
9 • Review our five year Business Plan by 31/03/2011
7 • Review furniture and equipment provided in sheltered housing properties by 31/03/2011
7 • Review arrangements for delivery and distribution of post in sheltered housing schemes by 31/03/2011
7 • Review a menu of activities and opportunities for sheltered housing tenants to engage with the wider community by 31/10/2010
P
Pi
O
Y
B
G
O
106 107
Directorate: Tenancy Services (Support and Care) Team: Concierge
• Provide a 24 hour responsive service for YHN tenants who receive the Concierge service
• Provide reception and security services, including 24 hour monitoring of CCTV and smoke alarms
• Provide building cleaning services in specific locations
• Perform a range of good neighbour duties to add value to the role
• Carry out regular inspections of building cleanliness, including sites where the cleaning service is provided by our service provider
• Liaise with our service provider to monitor performance within the building cleaning service level agreement, to ensure that any improvement actions plans are completed.
• Carry out regular safety and security inspections of YHN properties
• Provide customers with 24 hour access to the service via a free phone
Key work areas:
The targets below are monitored on a quarterly basis through the service plan monitoring programme
Wider Management Team target
2 • Continue implementation of the Concierge Service review recommendations by 30/03/2011
Service Standards
• Provide 90% of all new tenants with a welcome pack within seven working days of moving in during 2010/11
• Display our cleaning work schedule in buildings with a Concierge service during 2010/11
• Inspect all Concierge buildings every three months during 2010/11 to make sure our service provider is keeping to our cleaning standard
• Invite tenants’ representatives to our inspections every three months and make the results available to tenants if requested, during 2010/11
• Offer all new tenants an introduction to the Concierge Service during 2010/11
• During 2010/11 carry out all tenant introductions within seven working days of receiving the request unless a later date is specified by the customer
• Carry out safety and security checks for all Concierge blocks every day during 2010/11
Ref
Ref
Team target
2 • Undertake monthly building cleaning inspections for 100% of blocks during 2010/11
Equality and Diversity targets
8 • Involve SIAG during the implementation of the Concierge Service review recommendations at both the system stage and when procuring customer facing technologies during 2010/11
12 • Update the tenant induction pack information to cater for the range of customer needs by deadline outlined within service EINA action plan
The actions below contribute to achieving all of the above targets
Team actions
7 • Review arrangements for monitoring and patrolling the cartilage of blocks of flats by 30/09/2010
2 • Successfully complete a 12 month review of our Customer Service Excellence award by 31/03/2011
Pi
O
G
Y
B
108 109
Directorate: Tenancy Services (Care and Support)Team: Young Peoples Service
• Aim to prevent homelessness for 16 and 17 year olds in Newcastle by carrying out assessment of needs and family reconciliation
• Provide supported accommodation for homeless young people aged 16-21 through direct access into a 24 hour staffed hostel
• Provide support in our block of 16 semi-independent tenancies with on site support during office hours
• Provide intensive floating support for up to two years for young people aged 16-25
• Provide support to our families who are at risk of eviction
• Provide opportunities for young people and families to be involved in decision making on an individual basis and through youth voice and contribute to strategic plans within Newcastle
• Provide opportunities to volunteer
Key work areas:
The targets below are monitored on a quarterly basis through the service plan monitoring programme
YHN Top 20 and Wider Management Team target
1 • Achieve 60% level A’s in our Service Quality Framework assessments for Supporting People contracts during 2010/11
Wider Management Team target
1 • 90% of people living in our supported accommodation at North Kenton to maintain their tenancy for at least six months during 2010/11
Service standards
• We will make sure that everyone supported in a tenancy is fully involved in the decisions that affect their life. We aim to do this for at least 99% of customers during 2010/11
• We will provide advice and information to all young people and families using with our service to make sure they know their rights. We aim to do this for at least 99% of customers during 2010/11
• We will encourage all young people using our service to take part in their community or participate with Youth Voice. We aim to do this for at least 99% of customers during 2010/11
• We will assess the needs of all 16 and 17 year olds in Newcastle who are in need of accommodation. We aim to do this for at least 99% of customers during 2010/11
Ref
Ref
• We will assist all vulnerable young people who are supported by our floating support service to maintain a successful tenancy for 12 months. We aim to do this for at least 95% of customers during 2010/11
• We will offer an accreditation service to all young people supported by our service so they can gain recognition and qualifications for the skills and abilities they have. We aim to do this for 99% of all customers during 2010/11
• We will begin to develop a support plan for all young people and families within 10 working days of engaging with the service. We aim to do this for 99% of customers during 2010/11
• We will review all support plans within the following timescales:
• Monthly for all FIP clients;
• Every six weeks for all customers living in the hostel;
• Every three months for Floating support service customers or those living in our supported accommodation
We aim to do this for at least 99% of customers during 2010/11
Team targets
2 • Achieve 50% customer satisfaction during 2010/11 from young people involved in the homeless prevention service
2 • Achieve 90% customer satisfaction about the quality of support received by young people and families involved in the hostel, floating support, supported accommodation and FIP during 2010/11
Equality and Diversity targets
1 • All children and young people we support will be assisted to achieve their potential within the `Every Child Matters` framework during 2010/11
1 • Implement actions within the YHN Young Persons Strategy by deadlines outlined within the strategy action plan
8 • Investigate ways to increase service take up of customers from BME backgrounds and customers with a disability by 31/03/2011
5 • Complete all CRE actions within the CRE action plan on time during 2010/11
O
P
Pi
O
Y
B
110 111
Ref
The actions below contribute to achieving all of the above targets
Team actions
2 • Produce one outcome report in response to customer satisfaction surveys during 2010/11 for each aspect of the service
1 • Provide teenage pregnancy peer education in Walker School and Excelsior College during 2010/11
8 • Explore the possibility of working with NFS to sell on refurbished furniture to young people by 31/03/2011
8 • Work in partnership with the YHN Employability Co-ordinator to strengthen links with Connexions by 31/10/2010
9 • Produce an energy saving guide for young people by 31/03/2011
2 • Successfully complete a 12 month review of our Customer Service Excellence award by 30/06/2010 G
Directorate: Tenancy Services (Citywide)Team: Housing, Anti-social Behaviour and Enforcement Team
• Work in partnership with other enforcement and support agencies and support multi-agency working
• Work with local teams to tackle anti-social behaviour• Address breaches of tenancy• Manage Newcastle’s graded response intelligence model
Key work areas:
The targets below are monitored on a quarterly basis through the service plan monitoring programme
Wider Management Team target
6 • Carry out HASBET and Rent Recovery service review by 31/03/2011
Service standards
• We will always send you details of our Victim Support Officer. We aim to do this within five working days for 99% of our customers during 2010/11
• We will contact you within the following times to offer a face-to-face interview or an interview by phone, or by e-mail if you would prefer. The timescales are based on how serious the ASB is:
• The next working day if the ASB is very serious
• Within three working days if the ASB is serious but does not need an immediate response
• Within five working days for less serious types of ASB
Our target for the above timescales is 97% for all ASB during 2010/11
• We will always contact the person you say has carried out the ASB. We aim to do this within five working days of the timescales above for 97% of our customers during 2010/11. We will only do this with your permission. In certain circumstances, it may not be appropriate to contact them and we will explain the reasons for this to you
• We will always send you a customer satisfaction form. We aim to do this within five working days of closing a complaint for 99% of our customers during 2010/11
Team targets
2 • Achieve customer satisfaction rating of 76% for the handling of ASB cases referred to HASBET during 2010/11
9 • In 97% of cases we will install surveillance equipment within five working days after receiving RIPA authorisation during 2010/11
2 • Ensure 90% of closed ASB cases are resolved during 2010/11
Ref
O
Y
Pi
112 113
Ref
Equality and Diversity targets
1 • Continue to provide an analysis of hate crime to YHN’s Housing Management teams on a quarterly basis to help identify trends and hot spots of hate crime across the City during 2010/11
12 • Complete an EINA as part of the HASBET Service review by 31/03/2011
12 • Complete an EINA on the YHN Statement and summary of policies and procedures for ASB by 31/03/2011
The actions below contribute to achieving all of the above targets
Team actions
9 • Offer HASBET services to other social landlords by 31/03/2011 and generate £25,000 income
8 • Monitor and benchmark anti-social behaviour against core House Mark benchmarking activities on a quarterly basis during 2010/11
7 • Evaluate the effectiveness of the methods and materials, including electronic methods, used to communicate ASB information to customers by 31/03/2011
7 • Investigate the feasibility of introducing an out of hours service on all estates by 31/03/2011
7 • Evaluate the effectiveness of the current procedures used to deal with noisy neighbours by 31/03/2011
Directorate: Tenancy Services (Citywide)Team: Newcastle Furniture Service
• Provide a comprehensive furniture service to the City Council, other housing providers and charities in the region and in addition operate a child safety equipment scheme for Newcastle residents in partnership with the Primary Care Trust and ROSPA
• Provide the YHN garden care maintenance service, which is available to all tenants
• Provide a document management service for YHN
Key work areas:
The targets below are monitored on a quarterly basis through the service plan monitoring programme
Wider Management Team Target
2 • Increase external managed furnished tenancies by 40% by 31/03/2011
Service standards
• We will deliver furniture to you within five working days of you asking us. We aim to do this for at least 93% of all deliveries during 2010/11
• We will collect furniture from you within five working days of you asking us. We aim to do this for at least 93% of all collections during 2010/11
• We will visit you after delivering your furniture pack to make sure everything is all right. We aim to do this within eight weeks for at least 93% of deliveries during 2010/11
• We will repair or replace any faulty cooker we have supplied to you within two working days of you telling us about it. We aim to do this for at least 93% of all requests during 2010/11
• We will carry out all terminations for YHN tenants within three working days of a request. We aim to do this for 93% of all requests during 2010/11
The Garden Care Service:
• We will visit you 11 times within a 12 month period
• We will answer all queries we receive. We aim to do this within two working days for at least 93% of queries during 2010/11
The Child Safety Equipment Scheme:
• We will install your safety equipment within eight weeks of you asking us. We aim to do this for 93% of all requests during 2010/11
• We will answer all queries we receive. We aim to do this within two working days for at least 99% of queries during 2010/11
Ref
B
G
Pi
O
114 115
Ref
Team targets
2 • Achieve 95.5% satisfaction with services by 31/03/2011
1 Child safety equipment scheme:
• Install 1500 child safety equipment packages by 31/03/2011
2 Gardening scheme:
• Increase by 300 the number of tenants receiving the Garden Care Service by 31/03/2011
The actions below contribute to achieving all of the above targets
Team actions
2 • Achieve the Customer Excellence Standard by 31/10/2010
2 • Run four stakeholder groups during 2010/11
1. YHN Staff and council tenants
2. External organisations and service users
3. Garden Care service users
4. Child Safety service users
9 Furniture service:
• Explore the possibility of providing record management to other organisations by 31/03/2011
Gardening service:
7 • Review the garden care service by 31/03/2011
7 • Explore the possibility of providing a chargeable one-off gardening service by 31/03/2011
7 • Review current promotional material with view to increase level of information provided by 31/03/2011
Directorate: Tenancy Services (Citywide)Team: Rent Recovery Team
• Implement quality assurance in rent arrears recovery
• Help maximise income of tenants
• Work with Courts in targeting ‘won’t pay’ tenants
• Work in partnership with Community Housing Teams to recover rent
• Benchmarking cost and performance
Key work areas:
The targets below are monitored on a quarterly basis through the service plan monitoring programme
Wider Management Team target
6 • Carry out HASBET and Rent Recovery service review by 31/03/2011
Service standards
• We will prepare particulars of claim and lodge papers at court within three working days of receiving a court referral and a valid Notice of Seeking Possession. We will do this for 98% of cases during 2010/11
• We will send out a covering letter, witness statement and fact sheet to defendants 10 working days prior to court hearings in 99% of cases, in order to comply with the pre-action protocol for rent arrears, during 2010/11
• We will check and action if necessary all adjourned rent arrears cases on a weekly basis during 2010/11
• We will check and action if necessary all referrals for a warrant of eviction within four working days of receiving the request and update the rent account where appropriate. We will do this for 98% of cases during 2010/11
• We attend court for all YHN cases listed for rent arrears during 2010/11
• We will check all active rent recovery cases within five working days and update the rent account where appropriate. We will do this for 98% of cases during 2010/11
• We will publish our performance figures to internal customers on a quarterly basis during 2010/11
• We will send out questionnaires on an annual basis to our internal customers and respond to any issues raised and provide feedback within 10 working days during 2010/11
Ref
G
Y
Pi
O
116 117
Ref
Team targets
2 • Achieve 65% user satisfaction during 2010/11
8 • 99% compliance with the pre-action protocol for rent arrears during 2010/11
9 • Refer 99% of tenants who go through the court process to the Advice and Support Service during 2010/11
Equality and Diversity action
12 • Complete an EINA as part of the Rent Recovery Service review by 31/03/2011
The actions below contribute to achieving all of the above targets
Team actions
9 • Review working arrangements with legal services in respect of preparation of applications for warrants and implement any recommendations by 31/03/2011
8 • Review printing and postage costs of rent arrears letters and implement any recommendations by 30/06/2010
9 • Benchmark the cost of rent recovery service delivery annually and collection performance quarterly during 2010/11
9 • A Rent Recovery Officer will be available when requested to carry out joint visits with Housing Officers during 2010/11
9 • A Rent Recovery Officer will be available when requested to visit each Housing Office to discuss and review cases during 2010/11
2 • Achieve Customer Service Excellence accreditation for HASBET and Rent Recovery Team by 31/03/2011
Directorate: Tenancy Services (Citywide)Team: Your Choice Homes
We manage the council’s lettings policy on their behalf. This is a partnership with other housing providers. We market homes, monitor performance and ensure the service is delivered in an open, fair and consistent way.
We operate from a city centre location, where our Health and Welfare Team, provided in partnership with Health and Social Services, assess the housing needs of our customers to help them to maintain their independence.
Key work areas:
The targets below are monitored on a quarterly basis through the service plan monitoring programme
Wider Management Team target
9 • Complete all 2010/11 allocated actions in relation to the Councils new Lettings Policy
Service standards
• When YCH receives your application form we will aim to register 95% within five working days during 2010/11. We will write to you to confirm this
• If you qualify to join YCH, we will write to you and confirm this. This will include your ‘Prospects’ information, which tells you what homes you are able to bid for and how long you may have to wait, and a satisfaction survey so that you can tell us about the service we provided
• If you do not qualify to join YCH, we will write to you and confirm this:
• Why this is;
• What information we have considered; and
• What can be done to qualify? This will include what support will be available to you
• We will deal with 95% of appeals within 21 days during 2010/11
RefB
G
Y
Pi
O
118 119
Ref
Team targets
8 • All customers will have their housing need assessed and if needed be offered support and information about housing options available during 2010/11
2 • We will achieve 75% satisfaction with the service by 31/03/2011
8 • We will complete all verification decisions within five working days of receiving all information during 2010/11
8 • We will complete all requests for priority assessments on medical and welfare within 10 working days of receiving all relevant information during 2010/11
8 • We will achieve 100% Housing Association nominations to new build properties in line with the nomination agreement with NCC during 2010/11
8 • We will achieve 60% Housing Association Nominations to existing properties during 2010/11
Equality and Diversity targets
5 • Complete all CRE actions within the CRE action plan on time during 2010/11
1 • Review Disability Action Plan for YCH Property Shop by 31/03/2011
The actions below contribute to achieving all of the above targets
Team actions
9 • Chair the Tyne and Wear Sub Regional Choice Based Lettings Group ensuring all 2010/11 actions are completed on time and in line with partnership agreement
8 • Ensure that link between health targets and housing are considered and aligned by 31/03/2011
2 • Improve customer information about available housing options by 31/03/2011
8 • Investigate possible ways to streamline processes created by new lettings policy by 31/03/2011
9 • Advertise YHN job opportunities to customers in the YCH Office during 2010/11
2 • Produce monthly nominations performance information and report to NCC for action during 2010/11
Directorate: Tenancy Services Team: Customer Service
We are responsible for managing and coordinating the implementation of YHNs Customer Service Strategy “Every Customer Matters” across our business areas. We will achieve this through collaboration with all our service managers and staff and by delivery of our Customer Service Strategy Action Plan under the governance of the YHN Service Improvement Programme Board. The YHN Customer Service Strategy Action Plan is aligned to the five criterion of the Customer Service
Excellence Standard;
• Customer Insight
• The Culture of the Organisation
• Information and Access
• Delivery
• Timeliness and Quality of Service
In addition the Customer Service Team will manage and coordinate all activities
and reporting relating to:
• YHN Complaints Policy and Process
• YHN Customer Service Excellence Programme
• National Indicator 14 (Avoidable Contacts)
Key work areas:
RefB
Y
G
P
The targets below are monitored on a quarterly basis through the service plan monitoring programme
YHN Top 20 and Wider Management Team target
2 • Achieve the corporate Customer Service Excellence accreditation by 31/03/2011
Wider Management Team target
2 • 95% of complaints to be given a full written response within 10 working days during 2010/11
Service standards
• We will reply to letters within 10 working days during 2010/11
• We will answer 90% of calls within five rings during 2010/11
Team targets
2 • Work with investigating officers providing advice and support in order to ensure formal complaints are given a full written response by them in 10 working days during 2010/11
2 • Investigating officers to achieve 50% satisfaction in how complaints are handled during 2010/11
Pi
O
Y
120 121
Ref
8 • Include demographic analysis of all informal and formal complaints in the YHN Performance Committee report on a quarterly basis during 2010/11
2 • Acknowledge 90% of formal complaints within three working days during 2010/11
2 • Send 90% of formal complaints to investigating officers within two working days of receipt during 2010/11
Equality and Diversity targets
2 • Continue to analyse demographics from informal and formal complaints and include this information in the quarterly Committee report during 2010/11
2 • Report on sexual orientation on complaints in line with Your Homes Newcastle’s collection of data on Northgate and reflect this quarterly in board reports during 2010/11
12 • Complete an EINA on the YHN Customer Service Strategy by 31/12/2010
12 • Complete an EINA on the YHN Compliments, complaints and comments procedure by 31/12/2010
12 • Complete an EINA on the YHN Remedies Policy by 31/12/2010
The targets below are monitored on a monthly basis via the Service Improvement Programme
Strategy target
6 • Complete a review of the YHN Customer Service Strategy by 31/12/2010
The actions below contribute to achieving all of the above targets
Team actions
2 • Report all active formal complaints on a weekly basis to all managers during 2010/11
2 • Report on compliments and complaints on a quarterly basis to sections of YHN during 2010/11
2 • Report complaints performance to YHN Performance Committee every quarter during 2010/11
2 • Hold Complaints Champions meetings every quarter to learn from compliments and complaints during 2010/11
2 • Feedback to customers on complaints every quarter in Homes + People during 2010/11
2 • Hold the Complaints ‘R’ Us Scrutiny Panel with tenants and leaseholders every quarter to review the quality of step three complaints during 2010/11
Directorate: Tenancy Services Team: Housing Management
We provide an excellent customer focused housing management service to the
council’s 30,000 rented properties and cross-tenure communities. This service is
delivered from eight full service Community Housing Offices, two satellite offices
and four Customer Service Centres. These services are:
• Estate management
• Tenancy enforcement including dealing with anti-social behaviour and rent
arrears
• The management of void properties
• Lettings
• Reporting and monitoring repairs
• Working in partnership with other agencies, especially NCC
• Working with leaseholders and the private sector
• Contributing to regeneration and development
• Sustaining and supporting tenancies and communities
• Assisting in the delivery of the Modern Homes Programme
Key work areas:
The targets below are monitored on a quarterly basis through the service plan monitoring programme
YHN Top 20 and Wider Management Team targets
2 • Reduce the average time taken to re-let properties to 21 days by 31/03/2011
2 • Reduce net rent arrears to £1,900,000
14 • Achieve 81% customer satisfaction with the overall housing service by 31/03/2011
8 • Achieve 60% satisfaction of tenants who report anti-social behaviour by 31/03/2011
2 • Achieve 81% Black Minority Ethnic (BME) satisfaction with the overall housing service by 31/03/2011
Wider Management Team target
6 • Carry out service review by 31/12/2010
RefB
R
Y
G
Pi
P
122 123
Ref Ref
Service Standards
• We will make sure that 95% of all YCH applications received by community housing teams are registered within five working days during 2010/11
• We will give you a copy of our standard for empty homes and will tell you what work we will do to your home before you move in. Our target is to meet this standard for at least 95% of new tenancies during 2010/11
• We will visit you at home within six weeks of you moving in to discuss any problems you may have, including paying your rent. We aim to meet this standard for at least 95% of tenancies during 2010/11
If you are experiencing anti-social behaviour we will contact you within the following times to offer a face-to-face interview or an interview by phone, or by e-mail if you would prefer. The timescales are based on how serious the ASB is:
• We will contact you the next working day if the ASB is very serious
• We will contact you within three working days if the ASB is serious but does not need an immediate response
• We will contact you within five working days for less serious types of ASB
Our target for the above timescales is 97% for all ASB during 2010/11
• We aim to inspect all empty properties within 24 hours of receiving the keys. We aim to achieve this standard in 95% of times during 2010/11
• We will monitor how satisfied our customers are with the service and we aim to achieve at least 81% satisfaction during 2010/11
Team targets
1 • Reduce the percentage of tenants evicted for rent arrears to no more than 0.25% by 31/03/2011
2 • 80% of Housing Project Budget to be committed and orders placed by 30/11/2011
Equality and Diversity targets
1 • Ensure all CHO DAPS Statements are reviewed during 2010/11 and all required works are delivered
3 • Carry out two awareness sessions for CHO staff on initiatives to support vulnerable customers during 2010/11 (e.g. Typetalk, induction loops, minicom and National Interpreting Service)
12 • Complete an EINA as part of the Housing Management Service review by 31/03/2011
The actions below contribute to achieving all of the above targets
Team actions
9 • Review the process for carrying out six week visits by 31/12/2010
9 • Explore the possibility of charging for tenants references by 31/12/2010
9 • Review and update all Northgate letter/form templates by 31/03/2011
7 • Review information provided by Community Housing Staff about local events and activities for young people and families 31/10/2010
7 • Review the Street Warden SLA to increase presence on estates and improve effectiveness by 31/03/2011
O
G
Y
B
124 125
Directorate: Tenancy ServicesTeam: Property Maintenance Services
The Property Maintenance Team is the YHN Client Team managing all aspects of repairs and maintenance, void reinstatement, minor works and programmed and cyclical maintenance for NCC’s housing stock.
The section also gives technical support to Investment Delivery, Leasehold Management, Community Housing Management, the ASU and Facilities Management.
We have overall contract management responsibility for the repairs service
provided by City Build and other Contractors to NCC homes.
Key work areas:
The targets below are monitored on a quarterly basis through the service plan monitoring programme
YHN Top 20 and Wider Management Team target
2 • Achieve 92% satisfaction with the repairs and maintenance Service during 2010/11
Wider Management Team target
2 • Ensure that 90% of maintenance contracts KPI’s are achieved in 2010/11
Service Standards
• We aim to carry out 99.5% of emergency repairs within our four hour timescale during 2010/11
• We aim to carry out 99% of urgent repairs within our one, three or seven day timescale during 2010/11
• We aim to carry out 99% of routine repairs within our 15 day timescale
• We aim to complete at least 98% of repairs at the first visit whenever possible during 2010/11
• We aim to achieve at least 92% customer satisfaction
• We aim to keep at least 97% of appointments that we have made for repairs during 2010/11
• We aim to carry out an annual gas safety check and issue a gas safety certificate for 99.9% of all properties we manage during 2010/11
Team targets
2 • Implement 90% of actions from the Repairs and Maintenance Strategy by 31/03/2011
8 • Complete 99% of all EPC requests within 15 working days of request during 2010/11
Ref
P
Pi
O
Y
Ref
Equality and Diversity targets
12 • Complete an EINA on the Repairs and Maintenance Strategy by 31/01/2011
12 • Complete an EINA on the YHN Environmental Sustainability Strategy by 31/03/2011
12 • Complete an EINA on the YHN Gas Servicing Policy by 31/12/2010
12 • Complete an EINA on the YHN Rechargeable Works Policy by 31/12/2010
2 • Complete all CRE actions within the CRE action plan on time during 2010/11
The targets below are monitored on a monthly basis through the Service Improvement Programme
Strategy targets
6 • Complete a review of the YHN Repairs and Maintenance Strategy by 31/01/2011
6 • Complete the YHN Environmental Sustainability Strategy by 31/03/2011
The actions below contribute to achieving all of the above targets
Team actions
7 • Explore the possibility of extending the repairs service to cover all repairs for specific customer groups (elderly/disabled) by 31/12/2010
7 • Review the repair ticket procedure, consider allocating one ticket per whole repair by 31/03/2011
7 • Implement a procedure to enable emergency repairs to be confirmed by telephone by 30/09/2010
7 • Review the planned maintenance system of fencing and wall repairs by 31/12/2010
B
R
G
126 127
Glossary
Acronym
A
AGM
ALMO
ARCH
ASB
ASU
B
BME
C
CCAS
CEO
CHO
CRE
D
DAPS
DHS
DWP
E
EINA
EPC
F
FAMIS
FIP
H
HASBET
HPF
HR
HRA
Acronym
HQN
K
KPI
KLOE
L
LGB
LGBT
M
MOSS
N
NCC
NEP
NECCAS
NFS
O
OCN
OD
OHS
P
PAFF
PC
PDA
PEMS
POPS
PRI
R
RIPA
ROSPA
RTB
Full description
Annual General Meeting
Arms Length Management Organisation
Agencies against Racist Crime and Harassment
Anti-Social Behaviour
Asylum Seekers Unit
Black, Minority and Ethnic
Community Care Alarm Service
Chief Executives Office
Community Housing Office
Commission for Racial Equality
Disability Action Plans
Diagnostic Health Solutions
Department for Work and Pensions
Equalities Impact Needs Assessment
Energy Performance Certificate
Financial Accounting and Management Information System
Family Intervention Project
Housing, Anti-Social Behaviour and Enforcement Team
Housing Project Fund
Human Resources
Housing Revenue Account
Full description
Housing Quality Network
Key Performance Indicator
Key Lines of Enquiry
Lesbian, Gay, Bisexual
Lesbian, Gay, Bisexual and Transgender
Microsoft Office SharePoint Services
Newcastle City Council
North East Procurement
North East Consortium for Asylum Seekers
Newcastle Furniture Service
Open College Network
Organisational Development
Occupational Health Service
Project Application for Funding
Personal Computer
Personal Digital Assistant
Planned Environmental Maintenance Schemes
Purchase Order Processing System
Potential Risk Indicator
Regulation of Investigatory Powers Act
The Royal Society for the Prevention of Accidents
Right to Buy
128 129
Acronym
S
SIAG
SLA
SMT
T
TSA
W
WMT
Y
YCH
YPS
Full description
Strategic Independent Advisory Group
Service Level Agreement
Senior Management Team
Tenancy Services Authority
Wider Management Team
Your Choice Homes
Young Peoples Service
Appendix 3
YHN 2009-10 Budget Position
Base Budget Revised Estimate Variation from Base budget
£ £ £ %
31,489,080 31,809,560 320,480 +1.0
Budget Base Budget Probable Variation from Estimate Base Budget
£ £ £ % Expenditure 130,057,270 125,476,160 -4,581,110 -3.52 Income 131,442,300cr 131,542,590cr +100,290cr +0.08
Surplus(cr) 1,385,030cr 6,066,430cr 4,681,400cr n/a
HRA 2009-10 Budget Position
2. 2009-10 HRA Revised Budgets
YHN and HRA Budgets for 2009-10 and 2010-11
The net expenditure shown in Table 1 is funded by a HRA Management Fee.
1. 2009-10 YHN Revised Budget - Summary of Latest Budget Position
Table 1
Table 3
Increase in 2009-10 YHN Management Fee [see Table 1] £320,480
Less
Supporting People Grant etc. Expenditure [Funding shown in HRA] £744,820
Increased Single Status Provision [Expenditure initally anticipated in 2008-09] £1,000,000
Adjusted Management Fee Increase [-4.5%] 1,424,340cr
Management Fee: External Factors
Table 2 below details factors affecting the Management Fee
Table 2
130 131
YHN 2010-11 Budget
Base Budget Variation Base to Base budget
2009-10 2010-11
£ £ £ %
31,489,080 31,624,190 135,110 +0.4
Table 3
3. 2010-11 YHN Base Budgets
The net expenditure shown in Table 3 is funded by a HRA Management Fee
Budget Base Budget Variation Base to Base Budget
2009-10 2010-11
£ £ £ % Expenditure 130,057,270 127,806,160 -2,251,110 -1.73 Income 131,442,300cr 131,582,570cr +140,270cr +0.11
Surplus(cr) 1,385,030cr 3,776,410cr 2,391,380cr n/a
HRA 2010-11 Budget
4. 2010-11 HRA Base Budgets
Increase in 2010-11 YHN Management Fee [see Table 3] £135,110
Less
Supporting People Grant etc. Expenditure [Funding shown in HRA] £916,550
Adjusted Management Fee Increase [-2.5%] 781,440cr
Management Fee: External Factors
Table 4 below details factors affecting the Management Fee
Table 4
Est Programme Estate Estate Package Ref Name Total
105 BENTINCK ESTATE 49 Traditional Internal
124 JUBILEE ESTATE 200 Traditional Internal
125 PENDOWER 384 Traditional Internal
127 RACHAEL / MAUGHAN ESTATE 213 Traditional Internal
208 HUNTERS MOOR WHEELCHAIR HSG 6 Traditional External
208 HUNTERS MOOR WHEELCHAIR HSG 6 Traditional Internal
218 FENHAM NORWEG TIMBER 81 NonTraditional Internal
219 FENHAM SOLVYT 24 NonTraditional Internal
220 FENHAM TRADS 56 Traditional Internal
221 FENHAM WILDS 64 NonTraditional Internal
222 MORPETH STREET/HUNTERS ROAD 7 Traditional Internal
227 MORPETH STREET/HUNTERS ROAD MID RISE 40 Multi Storey Internal
230 SLATYFORD NO FINES 250 NonTraditional Internal
231 SLATYFORD MID RISE 40 Multi Storey Internal
234 WESTGATE ROAD MULTIS 355 Multi Storey Internal
312 COWGATE 1940s 24 Traditional Internal
316 LEA GREEN COURT SHLTD 25 Traditional Internal
321 FAWDON NO FINES MID RISE 102 NonTraditional External
321 FAWDON NO FINES MID RISE 102 NonTraditional Internal
333 ACQUIRED/MISC 4 Acquired External
337 KENTON NO FINES 77 NonTraditional Internal
342 MONTAGU MID RISE 118 Traditional Internal
344 MONTAGU WEST BUNGALOWS 20 Traditional Internal
345 MONTAGU WEST 95 Traditional Internal
356 COWGATE 1930s 286 Traditional Internal
403 HAZELRIGG 1946 BUNGALOWS 16 Traditional Internal
405 CHURCH ROAD EST NON TRAD BUNGALOWS 57 NonTraditional Combined
406 CHURCH ROAD EST 10 Traditional Internal
Appendix 42010/11 Modern Homes and Painting Programme(as at February 2010 – subject to review and change)
132 133
Est Programme Estate Estate Package Ref Name Total
406.1 CHURCH ROAD EST Cottages 6 Traditional Internal
419 GRANGE 80 Traditional Internal
420 HAZELRIGG PRE WAR 83 Traditional Internal
421 HAZELRIGG 1946 HOUSES 34 Traditional Internal
423 LINKS GREEN(HAREWOOD ROAD) 14 Traditional Internal
428 GRANGE/RYDAL ROAD 39 NonTraditional Internal
438 GRAHAM PARK ROAD MID RISE 9 Traditional External
505 HARESIDE MID RISE 184 Traditional Internal
512 NEWBURN/THE RETREAT 17 Traditional Internal
518 NEWBIGGIN HALL TREVELYAN DRIVE FLATS 9 Traditional External
518 NEWBIGGIN HALL TREVELYAN DRIVE FLATS 9 Traditional Internal
547 WEST DENTON CDA SOUTH (C-E ROADS) NO FINES 266 NonTraditional Internal
552 WEST DENTON/MULTIS 164 Multi Storey Internal
555 WESTERHOPE 1940s 57 Traditional Internal
558 WESTERHOPE 1960s 32 Traditional Internal
561 WHITE CITY 98 Traditional Internal
564 WEST DENTON DORRANS 73 NonTraditional Internal
566 WEST DENTON CDA SOUTH (C-E ROADS) 14 Traditional Internal
605 CRESSWELL STREET 100 Traditional Internal
608 BYKER DUNN TERRACE SHELTERED SHLTD 53 Traditional Internal
610 ADDISON GRAFTON MULTIS 177 Multi Storey Internal
617 BYKER - BOLAM AYTON RISE 240 Traditional Internal
617 BYKER - BOLAM AYTON RISE 240 Traditional External
618 BYKER JANET SQUARE/STREET 40 Traditional Internal
Est Programme Estate Estate Package Ref Name Total
619 BYKER WALL 390 Traditional Internal
620 BYKER - KENDAL GREEN/BROCK SQUARE 235 Traditional Internal
620 BYKER - KENDAL GREEN/BROCK SQUARE 237 Traditional External
623 BYKER RABY STREET 85 Traditional Internal
624 BYKER - GRACE STREET/SPIRES LANE 79 Traditional Internal
625 BYKER CARVILLE / MT PLEASANT SHLTD 24 Traditional External
625 BYKER CARVILLE / MT PLEASANT SHLTD 23 Traditional Internal
628 BYKER TOWN 202 Traditional Internal
629 BYKER - CHEVIOT/ST MICHAELS MOUNT 198 Traditional Internal
629 BYKER - CHEVIOT/ST MICHAELS MOUNT 214 Traditional External
634 GREENFORD ROAD MULTIS 269 Multi Storey External
639 WALKER PARK SHELTERED/DR RYAN SHLTD 39 Traditional Internal
642 ALGERNON RD / THERESA RUSSLL SHLTD 39 Traditional Internal
648 HEXHAM AVENUE(WALKER) DUOSLABS 51 Traditional Internal
650 HEXHAM AVENUE(WALKER) NORWEG TIMBER 1 NonTraditional Internal
652 WALKER/STH OF WHARRIER STREET 125 Traditional Internal
657 ROMAN AVENUE/ORPINGTON AVENUE BISF 37 NonTraditional Internal
661 ST ANTHONYS/NTH OF BIRDS NEST RD 370 Traditional Internal
663 THE GREENS SHLTD 89 Traditional Internal
134 135
Est Programme Estate Estate Package Ref Name Total
664 ST ANTHONYS/NTH OF DUNSTANBURGH 236 Traditional Internal
666.1 SANDY CRESCENT 186 Traditional Internal
667 ST ANTHONYS-ST ANTHONYS ROAD 82 Traditional Internal
669 POTTERY BANK 1936 211 Traditional External
676 WALKER/NTH OF GRASMERE AVE 63 Traditional Internal
677 WALKER/NTH OF GRASMERE AVE 64 Traditional Internal
696 GRASMERE AVE(ACQUIRED PROPERTY) 5 Acquired Internal
697 HEXHAM AVENUE(WALKER) TRADS 70 Traditional Internal
704 ACQUIRED PROPERTY/LOWER HEATON 191 Acquired Internal
722 HIGH HEATON/THE SPINNEY SHLTD 96 Multi Storey Internal
724 MINORIES SHLTD 24 Traditional Internal
725.2 SHIELDFIELD/VALE HOUSE 138 Multi Storey External
730 FAIRWAYS 54 Traditional Internal
885 City Wide Omits for Works 25 Traditional Internal
1141 CRUDDAS PARK MULTIS - SOCIAL BLOCKS 262 Multi Storey Combined
136
Your Homes Newcastle Limited. Registered in England and Wales. Registration number
5076256. Registered office: Newcastle Civic Centre, Barras Bridge, Newcastle upon Tyne
NE1 8PR. A company controlled by Newcastle City Council.
For more information log ontowww.yhn.org.uk