Project : Group Housing Colony Promoter : Aum Shree Hotels & Resorts Pvt Ltd. Compliance Report of the conditions laid in the Environmental Clearance: up to May 2015 EIA Coordinator Page | 1 For Aum shree Hotels & Resorts Pvt. Ltd. (Authorized Signatory) PROJECT INTRODUCTION: A group housing project coming up at village, Dhunela, sector-33 sohna Gurgaon, Haryana developed by “Aum Shree Hotels & Resorts Pvt. Ltd. Total plot area of the project is 75,838.08 sq. m. and the built up area is 1,48,644.68 sq. m. This project has been granted Environmental Clearance by State Environment Impact Assessment Authority, Haryana vide letter no. SEIAA/HR/2014/870 dated 30 th June 2014. Copy of environmental Clearance is enclosed as Annexure I. PROJECT DESCRIPTION: Location : Sector 33, village Dhunela, Gurgaon Haryana Plot Area : 75,838.08 sq. m. Built up Area : 1,48,644.68 sq. m. Number of Building block : 04 (Two blocks each with 2 basements) Residential Tower (A (GF+20 floor) A1 (GF+25 floors), (B (GF+35 floors) B1 (GF+25) and EWS 2 Blocks (GF+4 floors). Water Demand : 859 KLD (Fresh Water: 505 KLD; Treated water: 496KLD) Power Demand : 5000 kVA (Maximum Demand) STP Capacity : 744 KLD STP Technology : Moving Bed Bio Reactor (MBBR) PROJECT STATUS:- No construction activity has been undertaken at site. Site photographs enclosed as Annexure II. Copy of Certificate of Capital Investment is enclosed as Annexure III OBJECTIVES: To analyze the outcomes of EIA studies. To monitor the environmental data that has been collected in the assessment with the standards, predictions and expectations outlined prior to the projects’ commencement.

Final Compliance report Check - nromoef.gov.innromoef.gov.in/SMPR/26082015/58.pdfCompliance Report of the conditions laid in the Environmental Clearance: ... (MBBR) PROJECT STATUS:-

  • Upload
    lekiet

  • View
    214

  • Download
    2

Embed Size (px)

Citation preview

Page 1: Final Compliance report Check - nromoef.gov.innromoef.gov.in/SMPR/26082015/58.pdfCompliance Report of the conditions laid in the Environmental Clearance: ... (MBBR) PROJECT STATUS:-

Project : Group Housing Colony

Promoter : Aum Shree Hotels & Resorts Pvt Ltd.

Compliance Report of the conditions laid in the

Environmental Clearance: up to May 2015

EIA Coordinator

P a g e | 1

For Aum shree Hotels & Resorts Pvt. Ltd.

(Authorized Signatory)

PROJECT INTRODUCTION:

A group housing project coming up at village, Dhunela, sector-33 sohna Gurgaon, Haryana

developed by “Aum Shree Hotels & Resorts Pvt. Ltd. Total plot area of the project is 75,838.08 sq.

m. and the built up area is 1,48,644.68 sq. m. This project has been granted Environmental

Clearance by State Environment Impact Assessment Authority, Haryana vide letter no.

SEIAA/HR/2014/870 dated 30th

June 2014. Copy of environmental Clearance is enclosed as

Annexure I.

PROJECT DESCRIPTION:

Location : Sector 33, village Dhunela, Gurgaon Haryana

Plot Area : 75,838.08 sq. m.

Built up Area : 1,48,644.68 sq. m.

Number of Building block : 04 (Two blocks each with 2 basements) Residential Tower

(A (GF+20 floor) A1 (GF+25 floors), (B (GF+35 floors)

B1 (GF+25) and EWS 2 Blocks (GF+4 floors).

Water Demand : 859 KLD (Fresh Water: 505 KLD; Treated water: 496KLD)

Power Demand : 5000 kVA (Maximum Demand)

STP Capacity : 744 KLD

STP Technology : Moving Bed Bio Reactor (MBBR)

PROJECT STATUS:-

No construction activity has been undertaken at site. Site photographs enclosed as Annexure II.

Copy of Certificate of Capital Investment is enclosed as Annexure III

OBJECTIVES:

• To analyze the outcomes of EIA studies.

• To monitor the environmental data that has been collected in the assessment with the

standards, predictions and expectations outlined prior to the projects’ commencement.

Page 2: Final Compliance report Check - nromoef.gov.innromoef.gov.in/SMPR/26082015/58.pdfCompliance Report of the conditions laid in the Environmental Clearance: ... (MBBR) PROJECT STATUS:-

Project : Group Housing Colony

Promoter : Aum Shree Hotels & Resorts Pvt Ltd.

Compliance Report of the conditions laid in the

Environmental Clearance: up to May 2015

EIA Coordinator

P a g e | 2

For Aum shree Hotels & Resorts Pvt. Ltd.

(Authorized Signatory)

• To evaluate taking into account the findings of the project in relation to standards, pre-project

predictions and expectations.

• To establish the links between pre-project goals and targets and post project achievements.

• Control of project and environmental impacts

METHODOLOGY:

1. Monitoring – Collection of Environmental data (one day) post project scenario during

construction phase. The parameters include:

• Ambient Air Monitoring

• DG stack emissions

• Ambient Noise levels at the project boundary

• Ground water analysis

• Soil analysis

• Traffic monitoring

Other related information was collected during site visits as well as compliance of the

conditions were monitored and recorded during site visits.

2. Evaluation – the appraisal of the conformance with standards, predictions or expectations as

well as the environmental performance of the activity.

3. Management – making decisions and taking appropriate action in response to issues arising

from monitoring and evaluation activities.

4. Communication – informing the stakeholders about the results of EIA follow-up in order to

provide feedback on project/plan implementation as well as feedback on EIA processes.

AGENCY:

The study has been collectively carried out by Gaurang Environmental Solutions, Jaipur & M/s

Aqura Labs Pvt. Ltd. (NABET approved EIA Consultant Organization) & the environmental

parameters were recorded by M/s Eko Pro Engineers Pvt. Ltd. (NABL accredited & MOEF

recognized Environmental Laboratory)

Page 3: Final Compliance report Check - nromoef.gov.innromoef.gov.in/SMPR/26082015/58.pdfCompliance Report of the conditions laid in the Environmental Clearance: ... (MBBR) PROJECT STATUS:-

Project : Group Housing Colony

Promoter : Aum Shree Hotels & Resorts Pvt Ltd.

Compliance Report of the conditions laid in the

Environmental Clearance: up to May 2015

EIA Coordinator

P a g e | 3

For Aum shree Hotels & Resorts Pvt. Ltd.

(Authorized Signatory)

COMPLIANCE STATUS

PART A: SPECIFIC CONDITION

1. CONSTRUCTION PHASE

S. No. Condition in EC Compliance status

1. “Consent for Establish” shall be

obtained from Haryana State

Pollution Control Board under

Air and Water Act and a copy

shall be submitted to the SEIAA,

Haryana before the start of any

construction work at site.

Consent to Establish has been obtained vide letter

no. HSPCB/Consent: 2821215GUNOCTE1815568,

dated 15.04.2015. Copy of the CTE is enclosed as

Annexure IV.

2. A first aid room as proposed in

the project report shall be

provided both during construction

and operational phase of the

project.

The first aid facility will be provided at the site and

will be maintained throughout the construction and

post construction phase.

3. Adequate drinking water and

sanitary facilities shall be

provided for construction workers

at the site. Provision should be

made for mobile toilets. Open

defecation by the labours is

strictly prohibited. The safe

disposal of waste water and solid

waste generated during the

construction phase should be

ensured.

Housing Facility: Temporary housing facility will

be provided for construction workers.

Safe drinking water: Effective arrangements for

sufficient supply of wholesome drinking water will

be provided at suitable points conveniently situated

for all persons employed.

Toilet Facility: Separate temporary toilets will be

provided for male and female workers at site. The

toilets will be conveniently situated so that they are

accessible to the building workers at all times.

Waste Water Disposal: Waste water generated

during construction phase will be routed to septic

tank followed by soak pit.

Page 4: Final Compliance report Check - nromoef.gov.innromoef.gov.in/SMPR/26082015/58.pdfCompliance Report of the conditions laid in the Environmental Clearance: ... (MBBR) PROJECT STATUS:-

Project : Group Housing Colony

Promoter : Aum Shree Hotels & Resorts Pvt Ltd.

Compliance Report of the conditions laid in the

Environmental Clearance: up to May 2015

EIA Coordinator

P a g e | 4

For Aum shree Hotels & Resorts Pvt. Ltd.

(Authorized Signatory)

Solid Waste Disposal:

Different types of waste generated along with

management is given below:

Construction Waste :

• Excavated Soil: The total excavated earth quantity is estimated to be 1,35,600 m3.The

excavated earth material will be utilized for backfilling and horticulture development at the

project site.

• Municipal Solid Waste: Municipal solid waste generated (20 kg/day) form construction

workers will be sent to Municipality disposal site for disposal.

• Total of about 9000 MT of the construction waste is estimated to be generated. Details of

the same is given as under:

S.

N

o.

Particulars Waste generation

as per standard (MT)

% Disposal

1. Wood 4320 48 Sold to vendors

2. Dry Wall 1800 20 Will be reused within

project site

3. Concrete

810

9 Will be reused for filling

purposes

4. Metal Scrap 180 2 Sold to vendors

5. Cardboard 1350 2 Sold to vendors

6. Plastics 180 15 Sold to vendors

7. Electronic Scrap 180 2 Disposal at site.

8. Misc.(Paint,

Ceramic etc)

180 2 Disposal at site.

Page 5: Final Compliance report Check - nromoef.gov.innromoef.gov.in/SMPR/26082015/58.pdfCompliance Report of the conditions laid in the Environmental Clearance: ... (MBBR) PROJECT STATUS:-

Project : Group Housing Colony

Promoter : Aum Shree Hotels &

EIA Coordinator

4. All the topsoil excavated during

construction activities shall

for use in horticulture/landscape

development Within the project site.

5. The project proponent shall

the building material required during

construction phase is properly stored

within the project area and disposal of

construction waste should not create

any adverse effect on the

communities and should be disposed of

after taking necessary precautions for

general safety and health aspects of

people, only in approved sites with the

approval of competent authority.

6. Construction spoils, including

bituminous material and other

hazardous materials must not be

allowed to contaminate water courses

and the dump sites for such material

Group Housing Colony

: Aum Shree Hotels & Resorts Pvt Ltd.

Compliance Report of the conditions laid in the

Environmental Clearance: up to May 2015

P a g e | 5

For Aum shree Hotels & Resorts Pvt. Ltd.

All the topsoil excavated during

activities shall be stored

r use in horticulture/landscape

development Within the project site.

The topsoil excavated during construction phase

will be preserved at designated places and stock

piled. The same will be reutilized within the site

itself for landscaping purposes.

The project proponent shall ensure that

the building material required during

construction phase is properly stored

within the project area and disposal of

construction waste should not create

any adverse effect on the neighbouring

communities and should be disposed of

ecessary precautions for

general safety and health aspects of

people, only in approved sites with the

approval of competent authority.

Building material required for construction

be properly stored in designated storage area

within the project premises.

Construction spoils, including

bituminous material and other

s must not be

e water courses

the dump sites for such material

There will be no hazardous waste including

bituminous waste generated during the

construction phase as define under HWM Rules,

2008. However, the construction waste generated

during construction phase is being managed

Compliance Report of the conditions laid in the

Environmental Clearance: up to May 2015

For Aum shree Hotels & Resorts Pvt. Ltd.

(Authorized Signatory)

The topsoil excavated during construction phase

preserved at designated places and stock

piled. The same will be reutilized within the site

itself for landscaping purposes.

Building material required for construction will

properly stored in designated storage area

within the project premises.

ere will be no hazardous waste including

bituminous waste generated during the

construction phase as define under HWM Rules,

2008. However, the construction waste generated

during construction phase is being managed

Page 6: Final Compliance report Check - nromoef.gov.innromoef.gov.in/SMPR/26082015/58.pdfCompliance Report of the conditions laid in the Environmental Clearance: ... (MBBR) PROJECT STATUS:-

Project : Group Housing Colony

Promoter : Aum Shree Hotels & Resorts Pvt Ltd.

Compliance Report of the conditions laid in the

Environmental Clearance: up to May 2015

EIA Coordinator

P a g e | 6

For Aum shree Hotels & Resorts Pvt. Ltd.

(Authorized Signatory)

must be secured so that they do not

leach in to the ground water and any

hazardous waste generated during

construction phase, should be disposed

off as per applicable rules and norms

with necessary approval of the Haryana

State Pollution Control Board.

effectively by the contractors and site engineers.

Instructions have been given to the contractor to

dispose- off the solid waste with prior permission

at the municipality disposal sites only. However,

efforts have been made to reduce the quantity of

the waste generated by proper management of the

construction material and judicious use of the

resources.

7. The diesel generator sets to be used

during construction phase should be of

ultra-low sulphur diesel type and

should conform to Environment

(Protection) Rules prescribed for air

and noise emission standards.

D.G. set conforming to the applicable rules for air

and noise emissions will be deployed at the site.

Low sulphur fuel (sulphur content: 0.05%) will

be used in the DG sets during construction phase.

8. The diesel required for operating DG

Sets shall be stored in underground

tanks and if required, clearance from

Chief Controller of Explosive shall be

taken.

Diesel used for D.G. sets will be stored in plastic

drums. Further, the same will be placed on

impervious base to avoid contamination of soil or

ground water due to spillages.

9. Ambient noise level should conform to

the residential standards both during

day and night. Incremental pollution

loads on the ambient air and noise

quality should be closely monitored

during construction phase. Adequate

measures should be taken to reduce

ambient air and noise level during

construction phase, so as to conform to

the stipulated residential standards of

CPCB/MoEF.

All necessary measures will be adopted to ensure

that air & noise levels conform to residential

standards laid down by CPCB.

The same are listed as under:

• Unnecessary idling will be avoided through

the use of auxiliary power units, electric

equipment, and strict enforcement of idling

limits.

• Heavy vehicles carrying construction material

will be operated during night time to avoid

traffic congestions especially during the peak

hours.

Page 7: Final Compliance report Check - nromoef.gov.innromoef.gov.in/SMPR/26082015/58.pdfCompliance Report of the conditions laid in the Environmental Clearance: ... (MBBR) PROJECT STATUS:-

Project : Group Housing Colony

Promoter : Aum Shree Hotels & Resorts Pvt Ltd.

Compliance Report of the conditions laid in the

Environmental Clearance: up to May 2015

EIA Coordinator

P a g e | 7

For Aum shree Hotels & Resorts Pvt. Ltd.

(Authorized Signatory)

• Minimum use of DG set (only at the time of

power cuts or failure).

• Regular sprinkling on haul road to minimize

the fugitive emissions.

• PUC Certified vehicles will be used.

• Enclosure construction will be fully bolted

keeping in view the major service

requirement.

• Provision of protective equipments like ear

muffs to the workers.

10. Fly ash should be used as building

material in the construction as per the

provisions of fly ash notification of

September 1999 and as amended on

27th

August 2003.

Fly ash will be used as building material as

mentioned under:

S. No. Building Material Fly Ash

content

1. Portland Pozzolana Cement 17-20 %

2. Ready Mix Concrete 30 %

3. Fly ash bricks 60-80%

11. Storm water control and its reuse as per

CGWB and BIS standards for various

applications should be ensured.

Storm water control and rain water harvesting

will be done as per the standards laid down by

CGWA & BIS. Following measure will be

adopted for the same:

Construction Sequencing: Construction

sequencing (involves disturbing only part of a site

at a time to prevent erosion from dormant parts)

will be done at site. Soils will be effectively

stabilized on one part of the site before grading

and construction commence at another part.

Compost Blankets: A compost blanket is a layer

of loosely applied composted material placed on

the soil in disturbed areas to reduce storm water

Page 8: Final Compliance report Check - nromoef.gov.innromoef.gov.in/SMPR/26082015/58.pdfCompliance Report of the conditions laid in the Environmental Clearance: ... (MBBR) PROJECT STATUS:-

Project : Group Housing Colony

Promoter : Aum Shree Hotels & Resorts Pvt Ltd.

Compliance Report of the conditions laid in the

Environmental Clearance: up to May 2015

EIA Coordinator

P a g e | 8

For Aum shree Hotels & Resorts Pvt. Ltd.

(Authorized Signatory)

runoff and erosion. This material fills in small

rills and voids to limit channelized flow, provides

a more permeable surface to facilitate storm water

infiltration, and promotes re-vegetation.

12. Water demand during construction

should be reduced by use of pre mixed

concrete, curing agents and other best

practices.

Best construction practices will be adopted to

reduce the water demand for construction

activities:

• Use of curing water: Spraying of curing water

and after liberal curing, all concrete structures

are covered with gunny bags, followed by

spraying of water.

• Use of polymer dispersion and air entraining

agents to reduce the construction water

demand.

• Admixtures will be used to reduce water

demand during construction.

• Ready mix concrete will be used to the extent

possible, for construction purposes to reduce

the water demand.

• Discouraging the washing of vehicles and

equipment on the construction site. Workers

will not be allowed to wash their personal

vehicles on site. Vehicles and equipment that

regularly leave the construction site should be

washed offsite.

13. In view of the severe constrains in

water supply augmentation in the

region and sustainability of water

resources, the developer will submit the

NOC from CGWA specifying water

extraction quantities and assurance

Drinking water (Potable): will be met through

tanker water supply of HUDA.

Construction water (Non-potable): The water

demand will be met from STP treated waste water

supply from HUDA (primary & secondary

treated) treated) which will be treated in STP of

Page 9: Final Compliance report Check - nromoef.gov.innromoef.gov.in/SMPR/26082015/58.pdfCompliance Report of the conditions laid in the Environmental Clearance: ... (MBBR) PROJECT STATUS:-

Project : Group Housing Colony

Promoter : Aum Shree Hotels & Resorts Pvt Ltd.

Compliance Report of the conditions laid in the

Environmental Clearance: up to May 2015

EIA Coordinator

P a g e | 9

For Aum shree Hotels & Resorts Pvt. Ltd.

(Authorized Signatory)

from HUDA/ utility provider indicating

source of water supply and quantity of

water with details of intended use of

water – potable and non-potable.

Assurance is required for both

construction and operation stages

separately. It shall be submitted to the

SEIAA and RO, MoEF, Chandigarh

before the start of construction.

capacity 744 KLD (secondary & tertiary

treatment) and then reused for construction

activities.

Related records:

No Objection Certificate from HUDA, Gurgaon:

Annexure V (a).

Ground water will not be used for construction

activities.

During operational phase of the project water

demand will be met through water supply from

HUDA. Ground water will not be used for the

project. Water assurance letter from HUDA

enclosed as Annexure V (b).

14. Roof must meet prescriptive

requirement as per energy conservation

building code by using appropriate

thermal insulation material.

Thermal characteristics of the roof assembly shall

be as under:

Climate zone: Composite*

Building Type: 24 hrs. used building

U value (W/m2-°C) 0.409

R value (m2°C/W) 2.1

*Source: ECBC CODE 2007

Following measures will be adopted to reduce the

heat ingress into the building:

• The solar panels will be provided on the roof

which will help to reduce exposed area,

thereby, reducing the heat gains inside the

building.

• Energy efficient materials, heat reflecting

terrace surface and roof (by using broken

white china tiles & heat reflecting paint) will

be provided to reduce head gains.

• Broken bricks will be used for roof insulation.

Page 10: Final Compliance report Check - nromoef.gov.innromoef.gov.in/SMPR/26082015/58.pdfCompliance Report of the conditions laid in the Environmental Clearance: ... (MBBR) PROJECT STATUS:-

Project : Group Housing Colony

Promoter : Aum Shree Hotels & Resorts Pvt Ltd.

Compliance Report of the conditions laid in the

Environmental Clearance: up to May 2015

EIA Coordinator

P a g e | 10

For Aum shree Hotels & Resorts Pvt. Ltd.

(Authorized Signatory)

• Roofs will be painted with reflective,

aluminium based paints with solar reflectance

ranging from 0.3-0.6. This will result in less

absorption of sunlight causing 40% back

reflection and less heating of building

structure during summer seasons.

15. Opaque wall must meet prescriptive

requirement as per Energy

Conservation Building Code which is

proposed to be mandatory for all air

conditioned spaces while it is desirable

for non-air conditioned spaces by use

of appropriate thermal insulation

material to fulfil requirement.

Thermal characteristics of the wall assembly shall

be as under:

Climate zone: Composite*

Building Type: 24 hrs. used building

U value (W/m2-°C) 0.352

R value (m2°C/W) 2.35

*Source: ECBC CODE 2007

The wall will be made with fly ash bricks, AAC

blocks, plastered outside and water proofing

paint. Shading devices provided to shade to

windows and external façade. Following

measures will be adopted to reduce the heat

ingress inside the building:

• Recessed windows and Covered balconies to

limit direct heat gains.

• For walls of the building, a maximum of 10%

window to wall ratio will be there to minimize

solar radiation

• There will be less no. of openings on the west

side and more no. of openings in the south

side.

• Use of fly ash based cement having lower U

& R values.

16. The approval from competent authority Structural Stability:

Page 11: Final Compliance report Check - nromoef.gov.innromoef.gov.in/SMPR/26082015/58.pdfCompliance Report of the conditions laid in the Environmental Clearance: ... (MBBR) PROJECT STATUS:-

Project : Group Housing Colony

Promoter : Aum Shree Hotels & Resorts Pvt Ltd.

Compliance Report of the conditions laid in the

Environmental Clearance: up to May 2015

EIA Coordinator

P a g e | 11

For Aum shree Hotels & Resorts Pvt. Ltd.

(Authorized Signatory)

shall be obtained for structural safety of

the building on account of earthquake,

adequacy of fire fighting equipments,

etc. as per National Building Code

including protection measures from

lightening etc. If any forest land is

involved in the proposed site, clearance

under Forest Conservation Act shall be

obtained from the competent authority.

The entire building will be designed as per the

provisions of National Building Code-2005 for

structural safety of the building against any

possible earthquakes.

Further, Forest Clearance under Forest

Conservation Act is not applicable as there is no

forest land involved in the project. The copy of

certificate obtained from Divisional Forest

Officer, Gurgaon is enclosed as Annexure VI.

17. Overexploited groundwater and

impending severe shortage of water

supply in the region requires the

developer to redraw the water and

energy conservation plan. Developer

shall reduce the overall footprint of the

proposed development .Project

proponent shall incorporate water

efficiency /saving measures as well as

water reuse /recycling within 3 months

and before start of construction to the

SEIAA, Haryana and RO .MOEF ,GOI

,Chandigarh.

During construction phase water demand will be

met through treated water supply from HUDA.

Water conservation measures (Construction

Phase): has been detailed at point 12 above.

The water and energy conservation plan is given

below:

Total Water Demand : 859 KLD

Type Quantity Source

Fresh water 505 KLD HUDA water supply

Treated

water

496 KLD STP treated water

Water conservation measures (Construction Phase):

• Curing water sprayed and after liberal curing all concrete structures are covered with gunny

bags this will conserve water.

• There is provision of using polymer dispersion and air entraining agents to reduce the water

demand for construction.

• Provisions to ensure the construction vehicles stick to the access track to prevent mud & dirt

being deposited on roads.

• Fence is constructed around the site to trap sediments whilst allowing the water to flow

through.

Page 12: Final Compliance report Check - nromoef.gov.innromoef.gov.in/SMPR/26082015/58.pdfCompliance Report of the conditions laid in the Environmental Clearance: ... (MBBR) PROJECT STATUS:-

Project : Group Housing Colony

Promoter : Aum Shree Hotels & Resorts Pvt Ltd.

Compliance Report of the conditions laid in the

Environmental Clearance: up to May 2015

EIA Coordinator

P a g e | 12

For Aum shree Hotels & Resorts Pvt. Ltd.

(Authorized Signatory)

Water conservation measures (Post Construction phase):

• Dual plumbing system will be used for the project to utilize the treated waste water .This will

help in reducing the fresh water demand by 54%.

• Dual flushing fixtures will be used to allow different volumes of water for solid and liquid

flushing which will help in conserving the water demand for flushing significantly.

• Landscape design & management of irrigation systems:

• Drought tolerant species will be selected.

• Turfs will be avoided to the extent possible.

• Central shut off valve will be provided

• Drip irrigation/ sprinkler irrigation system will be used to conserve water

• Water meters will be installed for the following:

• Potable water consumption

• Landscape water consumption

• Hot water consumption through solar systems, at building level

• Treated waste water consumption

• DG cooling water make up

Energy Conservation Measures (Construction Phase):

• Efficient work scheduling and methods that minimise equipment idle time and double

handling of material

• Switching off construction equipment when not in use

• Switching off site office equipment and lights and using optimum lighting intensity for

security and safety purposes

• Regular maintenance of equipment to ensure optimum operations and fuel efficiency.

18. The project proponent as stated in the

proposal shall construct 17 nos. rain water

harvesting pits for recharging the ground

water within the project premises. Rain

water harvesting pits shall be designed to

make provisions for silting chamber and

removal of floating matter before entering

Rain water harvesting (RWH) system for roof

run-off and surface run-off will be designed

and implemented as per the submitted plan &

GOI manual.

17 nos. of rain water harvesting pits will be

provided for rain water harvesting during

operational phase of the project.

Page 13: Final Compliance report Check - nromoef.gov.innromoef.gov.in/SMPR/26082015/58.pdfCompliance Report of the conditions laid in the Environmental Clearance: ... (MBBR) PROJECT STATUS:-

Project : Group Housing Colony

Promoter : Aum Shree Hotels & Resorts Pvt Ltd.

Compliance Report of the conditions laid in the

Environmental Clearance: up to May 2015

EIA Coordinator

P a g e | 13

For Aum shree Hotels & Resorts Pvt. Ltd.

(Authorized Signatory)

harvesting pit. Maintenance budget and

persons responsible for maintenance must

be provided. Care shall also be taken that

contaminated water do not enter any RWH

pit.

Design of Rain Water Harvesting :

For good design of rainwater harvesting,

following points are to be kept under

consideration:

• Ideal location with good ground slope.

• The location has adequate subsurface

permeability of the aquifer to accommodate

maximum recharge of rainwater through

injection well.

• Rate of filtration should exceed average

rainfall intensity.

• Clogging of filtration media should be

cleaned periodically.

• Ground water pollution does not take place.

• There will be provision of silting chamber

to remove floating matter before entering

harvesting pit.

19. The project proponent shall provide for

adequate fire safety measures and

equipments as required by Haryana Fire

Service Act, 2009 and instructions issued

by the local Authority / Directorate of fire

from time to time. Further the project

proponent shall take necessary permission

regarding fire safety scheme/NOC from

competent Authority as required.

The same will be complied with.

Adequate fire safety measure will be

adopted at site:

• Good construction practises

• All Safe construction practices &

precautionary measures will be adopted and

use of PPE will be mandatory.

• Adequate fire-fighting arrangements will be

as per National Building Code - 2005 &

conditions laid in fire NOC.

• All applicable IS standards for electricity

will be followed during construction phase.

• Indian Electricity Act of 1910 and rules

issued there under revised up to date will be

Page 14: Final Compliance report Check - nromoef.gov.innromoef.gov.in/SMPR/26082015/58.pdfCompliance Report of the conditions laid in the Environmental Clearance: ... (MBBR) PROJECT STATUS:-

Project : Group Housing Colony

Promoter : Aum Shree Hotels & Resorts Pvt Ltd.

Compliance Report of the conditions laid in the

Environmental Clearance: up to May 2015

EIA Coordinator

P a g e | 14

For Aum shree Hotels & Resorts Pvt. Ltd.

(Authorized Signatory)

followed.

• Regulations for electrical equipment in

building issued by The Bombay Regional

Council of Insurance Association of India

will be followed.

20. The project proponent shall obtain

assurance from the DHBVN for supply of

5000 kVA of power supply before the start

of construction. In no case project will be

operational solely on generators without

any power supply from any external power

utility.

Assurance will be obtained from DHBVN for

power supply before the start of construction.

DG sets will be used as power back source

only during the power cuts & failure only and

the project will not be operational solely on

generators without any power supply from any

external power utility.

21. Detail calculation of power load and

ultimate power load of the project shall be

submitted to DHBVN under intimation to

SEIAA Haryana before the start of

construction. Provisions shall be made for

electrical infrastructure in the project area.

Detailed calculation of power load will be

submitted to DHBVN and power supply

assurance letter will be obtained from

DHBVN.

22. The project proponent shall not raise any

construction in the natural land depression

/ Nallah / water course and shall ensure

that the natural flow from the Nallah/

Water course is not obstructed.

The same is noted and no construction will be

carried out in the natural land/ nallah or water

course.

23. The project proponent shall keep the plinth

level of the building blocks sufficiently

above the level of the approach road to the

project. Levels of the other areas in the

group housing project shall also be kept

suitably so as to avoid flooding.

The plinth level of the building blocks will be

constructed sufficiently above the level of the

approach road.

24. Construction shall be carried out so that

density of population does not exceed

The maximum density of population due to the

proposed project will not exceed the approved

Page 15: Final Compliance report Check - nromoef.gov.innromoef.gov.in/SMPR/26082015/58.pdfCompliance Report of the conditions laid in the Environmental Clearance: ... (MBBR) PROJECT STATUS:-

Project : Group Housing Colony

Promoter : Aum Shree Hotels & Resorts Pvt Ltd.

Compliance Report of the conditions laid in the

Environmental Clearance: up to May 2015

EIA Coordinator

P a g e | 15

For Aum shree Hotels & Resorts Pvt. Ltd.

(Authorized Signatory)

norms approved by Director General Town

and Country Department, Haryana.

density of population by Director General

Town and Country Department, Haryana. The

same is summarized as under:

Max. Population density as

per approved zoning plan

Population Achieved Population density

as per design

Population

400ppa 7329 286 5238

25. The project proponent shall submit an

affidavit with the declaration that ground

water will not be used for construction and

only treated water should be used for

construction.

During construction phase of the project water

demand will be met from treated water from

HUDA. Copy of Certificate in this regards

issued from HUDA, Gurgaon, is enclosed as

Annexure V. The affidavit in this regard was

submitted during the EIA stage. We would like

to assure that ground water is not being used

for construction activities.

26. The project proponent shall not cut any

existing tree and project landscaping plan

should be modified to include those trees

in green area.

The content of para 26 are noted and will be

followed.

27. The project proponent shall provide 3

meter high barricade around the project

area, dust screen for every floor above the

ground, proper sprinkling and covering of

stored material to restrict dust and air

pollution during construction.

The same will be complied with. Following

measures will be adopted for mitigating dust

pollution during construction phase:

• Minimise dust generating activities

• The site will be covered from all four sides.

• Water sprinkling on haul roads.

• Water or Dust suppressants which are more

effective than water, will be applied

judiciously

• Covering the stockpiles to prevent wind

whipping

• Storage pile activity will be conducted

Page 16: Final Compliance report Check - nromoef.gov.innromoef.gov.in/SMPR/26082015/58.pdfCompliance Report of the conditions laid in the Environmental Clearance: ... (MBBR) PROJECT STATUS:-

Project : Group Housing Colony

Promoter : Aum Shree Hotels & Resorts Pvt Ltd.

Compliance Report of the conditions laid in the

Environmental Clearance: up to May 2015

EIA Coordinator

P a g e | 16

For Aum shree Hotels & Resorts Pvt. Ltd.

(Authorized Signatory)

downwind

• Unpaved roads will be properly maintained.

28. The project proponent shall construct a

sedimentation basin in the lower level of

the project site to trap pollutants and other

wastes during rains.

The content of para 30 are noted and will be

followed.

29. The project proponent shall provide proper

rasta of proper width and proper strength

for the project before the start of

construction

The same will be complied with.

30. The project proponent shall ensure that the

U value of the glass is less than 3.177 and

maximum solar heat gain co-efficient is

0.25 for vertical fenestration.

The same will be complied with. However, as

per ECBC 2007, the thermal characteristics of

the vertical fenestration will be as under:

Maximum U-factor Maximum SHGC Maximum VLT

3.30 W/m2-°C 0.25 0.27

Source:ECBC CODE 2005

31. The project proponent shall adequately

control construction dust like silica dust,

non-silica dust and wood dust. Such dusts

shall not spread outside project premises.

Project Proponent shall provide respiratory

protective equipments to all construction

workers.

The same will be complied with. Following

measures will be adopted for mitigating dust

pollution during construction phase:

• Cutting & grinding operations on site will be

conducted using equipment and techniques

that suppress and reduce dust emissions

• Respiratory protective equipments will be

provided to the construction workers.

32. The project proponent shall develop

complete civic infrastructure of the group

housing colony including internal roads,

green belt development, sewerage line, rain

The same will be complied with. Complete

infrastructural facilities will be provided before

operational phase of the project.

• Proper internal roads with adequate width

Page 17: Final Compliance report Check - nromoef.gov.innromoef.gov.in/SMPR/26082015/58.pdfCompliance Report of the conditions laid in the Environmental Clearance: ... (MBBR) PROJECT STATUS:-

Project : Group Housing Colony

Promoter : Aum Shree Hotels & Resorts Pvt Ltd.

Compliance Report of the conditions laid in the

Environmental Clearance: up to May 2015

EIA Coordinator

P a g e | 17

For Aum shree Hotels & Resorts Pvt. Ltd.

(Authorized Signatory)

water harvesting arrangements, storm

water drainage system, solid waste

management site and provision for

treatment of bio-degradable waste, STP,

water supply line, dual plumbing line,

electric supply lines etc. and shall offer

possession of the units/flats thereafter.

will be provided.

• Greenbelt development: About 22814.55

sq. m. (32%) area will be under landscape

during operational phase of the project.

• Sewerage Line: separate pipeline will be

provided for sewage generated from the

project.

• Rain water harvesting: rain water

harvesting will be done in the project. About

17 nos. of rain water harvesting pits will be

provided to recharge the ground water

aquifer.

• Solid waste management: Solid waste

generated from the project will be handled as

per Municipal Solid Wastes (Management

and Handling) Rules, 2000 and amended

Rules, 2008. The same is described at point

no. (e) of operational phase conditions.

• STP: for waste water treatment. An STP of

capacity 744 KLD will be provided at site.

• Dual plumbing: There will be dual

plumbing system for use of water with

different water quality which will result in

optimal use of water for different

applications. There will be two pipelines, one

supplying fresh water and other for supply of

treated water for flushing, landscaping etc.

33. The project proponent shall provide one

refuge area till 24 meter, one till 39 meter

and one after 15 meter as per National

Building Code. The project proponent shall

The same will be complied with. Refuge areas

will be provided as per National Building Code

2005.

Page 18: Final Compliance report Check - nromoef.gov.innromoef.gov.in/SMPR/26082015/58.pdfCompliance Report of the conditions laid in the Environmental Clearance: ... (MBBR) PROJECT STATUS:-

Project : Group Housing Colony

Promoter : Aum Shree Hotels & Resorts Pvt Ltd.

Compliance Report of the conditions laid in the

Environmental Clearance: up to May 2015

EIA Coordinator

P a g e | 18

For Aum shree Hotels & Resorts Pvt. Ltd.

(Authorized Signatory)

not convert any refuse area in the habitable

space and it should not be sold

out/commercialized.

34. The project proponent shall provide fire

control room and fire officer for building

above 30 meter as per National Building

Code.

Proper fire fighting arrangements will be made

as per NBC 2005.

35. The project proponent shall obtain

permission of Mines & Geology

Department for excavation of soil before

the start of construction.

The same will be complied with. Permission

will be obtained from Mines and Geology

Department for excavation of soil and copy of

the same will be submitted to your good office.

36. The project proponent shall seek specific

prior approval from concerned local

Authority/HUDA regarding provision of

storm drainage and sewage system

including their integration with external

services of HUDA/Local authorities

besides other required services before

taking up any construction activity.

The same will be complied with.

37. The site for solid waste management plant

is earmarked on the layout plan and the

detailed project for setting up the solid

waste management plant shall be submitted

to the Authority within one month.

The same will be complied with. Solid waste

generated during construction phase will be

handled as per rules and norms.

38. The project proponent shall submit the

copy of the fire safety plan duly approved

by Fire department before the start of

construction.

The same will be submitted soon.

39. The project proponent shall discharge

excess of treated waste water /storm water

in the public drainage system and shall

The same will be complied with. Excessive

treated water will be discharged in to public

drainage system after getting permission from

Page 19: Final Compliance report Check - nromoef.gov.innromoef.gov.in/SMPR/26082015/58.pdfCompliance Report of the conditions laid in the Environmental Clearance: ... (MBBR) PROJECT STATUS:-

Project : Group Housing Colony

Promoter : Aum Shree Hotels & Resorts Pvt Ltd.

Compliance Report of the conditions laid in the

Environmental Clearance: up to May 2015

EIA Coordinator

P a g e | 19

For Aum shree Hotels & Resorts Pvt. Ltd.

(Authorized Signatory)

seek permission of HUDA before the start

of construction.

HUDA.

40. The project proponent shall maintain the

distance between STP and water supply

line.

The same is noted and will be followed.

41. The project proponent shall ensure that the

stack height is 6 meter more than the

highest tower.

The same will be complied with. DG sets will

be provided with adequate stack. Height as per

the norms of CPCB.

42. The project proponent shall ensure that

structurally stability to withstand

earthquake of magnitude 8.5 on Richter

scale.

The entire building has been designed as per

the provisions of National Building Code-2005

for structural safety of the building against any

possible earthquakes.

43. The project proponent shall seek NOC

from Town and Country department

regarding height of the building allowed in

the skyline of that city.

The same will be complied with.

44. The project proponent shall provide

helipad facility as required under NBC

norms and shall seek permission of helipad

from AAI accordingly.

The contents of para 44 are noted and will be

complied with for building above 60 m in

height.

45. The project proponent shall implement the

revised parking /traffic circulation plan

dated 12.06.201 as submitted in the

meeting (width of ramp up to 6 meter)

The contents of para 45 are noted and will be

complied.

46. The project proponent shall implement

revised layout plan as submitted dated

12.06.2014(parking in between the blocks

of schools).

The contents of para 45 are noted and will be

complied

• OPERATIONAL PHASE

a) “Consent to Operate” shall be obtained The contents of para a) are noted and will be

Page 20: Final Compliance report Check - nromoef.gov.innromoef.gov.in/SMPR/26082015/58.pdfCompliance Report of the conditions laid in the Environmental Clearance: ... (MBBR) PROJECT STATUS:-

Project : Group Housing Colony

Promoter : Aum Shree Hotels & Resorts Pvt Ltd.

Compliance Report of the conditions laid in the

Environmental Clearance: up to May 2015

EIA Coordinator

P a g e | 20

For Aum shree Hotels & Resorts Pvt. Ltd.

(Authorized Signatory)

from Haryana State Pollution Control

Board under Air & Water Act and a copy

shall be submitted to the SEIAA, Haryana.

complied with.

b) The sewage treatment plant shall be

installed for the treatment of the sewage to

the prescribed standards including odour

and treated effluent will be recycled. The

installation of STP should be certified by an

independent expert and a report in this

regard should be submitted to the SEIAA

Haryana before the project is commissioned

for operation. Tertiary treatment of waste

water is mandatory. Discharge of treated

sewage shall conform to the norms and

standards of HSPCB, Panchkula. Project

Proponent shall implement such STP

technology which does not require filter

backwash.

The STP will be commissioned under the

guidance of an expert. Sewage treatment plant

scheme will be approved by HSPCB.

There will be zero exit discharge since the

treated effluent from STP (744 KLD) will be

recycled/ reused for flushing (216 KLD),

plantation (116 KLD), make up water for

cooling towers/ DG sets (22 KLD),water Body

(5 KLD) .We would like to assure that tertiary

treatment of the waste water will be done by

the means of UV followed by Ultra filtration

to meet the cooling water standards and the

treated water will conform to the standards of

CPCB/ HSPCB (whichever is stringent).

c) Separation of the grey and black water

should be done by the use of dual plumbing

line. Treatment of 100% grey water by

decentralized treatment should be done

ensuring that the re-circulated water should

have BOD level less than 5 mg/litre and the

recycled water will be used for flushing

,gardening and DG set cooling

Etc. to achieve zero exit discharge.

The same will be complied with. Dual

plumbing will be done during the operational

phase of the project. The STP treated water

will be recycled/reuse for flushing landscaping

and general washing purposes.

d) For disinfection of the treated waste water

ultra-violet radiation or ozonization process

should be used.

The same will be complied with. Ozone

treatment or UV radiation process will be used

for disinfection of treated waste water.

e) Diesel power generating sets proposed as D.G. set of cumulative capacity 4000 kVA (4

Page 21: Final Compliance report Check - nromoef.gov.innromoef.gov.in/SMPR/26082015/58.pdfCompliance Report of the conditions laid in the Environmental Clearance: ... (MBBR) PROJECT STATUS:-

Project : Group Housing Colony

Promoter : Aum Shree Hotels & Resorts Pvt Ltd.

Compliance Report of the conditions laid in the

Environmental Clearance: up to May 2015

EIA Coordinator

P a g e | 21

For Aum shree Hotels & Resorts Pvt. Ltd.

(Authorized Signatory)

source of back-up power for lifts. Common

area illumination and for domestic use

should be of enclosed type and conform to

rules made under the environment

(protection) Act .1986.The location of the

DG set shall be in the open as promised by

the project proponent with appropriate

stack height above the highest roof level of

the project as per the CPCB norms. The

diesel used for DG sets shall be ultra-low

sulphur diesel (35 ppm sulphur), instead of

low sulphur diesel.

nos. - 1000 kVA each) will be deployed at the

site.

DG sets of capacity > 1000 kVA: will be

housed in a room/ enclosure designed to meet

the applicable CPCB standards.

The DG sets will be equipped with acoustic

enclosure with proper stack height to

minimize the emission and noise generation.

Low sulphur fuel (sulphur content: 0.05%)

will be used in the DG sets.

f) Ambient Noise level should be controlled

to ensure that it does not exceed the

prescribed standards both within and at the

boundary of the proposed Group Housing

Project.

All necessary measures will be adopted to

ensure that noise levels conform to residential

standards laid down by CPCB. The same are

listed as under:

• D.G. sets will be housed in an acoustic

rooms designed to meet the CPCB standards

of noise.

• The driveways will have sufficient width so

that there is no congestion of vehicles during

peak hours which lead to increase in the

noise levels

• Adequate parking including provisions of

visitors parking

• Entry & exits will be manned with trained &

efficient security to ensure smooth flow of

vehicles.

• There will be less starting and stopping and

the vehicles will be speed restricted to

ensure the noise within the permissible

Page 22: Final Compliance report Check - nromoef.gov.innromoef.gov.in/SMPR/26082015/58.pdfCompliance Report of the conditions laid in the Environmental Clearance: ... (MBBR) PROJECT STATUS:-

Project : Group Housing Colony

Promoter : Aum Shree Hotels & Resorts Pvt Ltd.

Compliance Report of the conditions laid in the

Environmental Clearance: up to May 2015

EIA Coordinator

P a g e | 22

For Aum shree Hotels & Resorts Pvt. Ltd.

(Authorized Signatory)

limits.

• The area will cover 22814.55 sq. m. (32%)

area under landscape, which will help to

absorb noise.

g) The project proponent as started in the

proposal should maintain at least 32 % as

green cover area for tree plantation

especially all around the periphery of the

project and on the road sides preferably

with local species which can provide

protection against noise and suspended

particulate matter. The open spaces inside

the project shall be preferably landscape

and covered with vegetation/grass, herbs &

shrubs. Only locally available plant species

shall be used.

About 32% of the total area is under green belt

under shelter belt, Avenue Plantation, Shrubs,

herbs, parks, landscaping, water body and

climber plants. The same is detailed as under:

Description Area (sq. m.)

Total plot area 75838.08

Landscape Area 22814.55

Shelter belt 9268.42

Avenue plantation 6416.59

Shrubs, herbs, organised

green area etc.

3564.77

water body 3564.77

Total 22814.55

h) The project proponent shall strive to

minimize water in irrigation of landscape

by minimizing grass area, using native

variety, xeriscaping and mulching, utilizing

efficient irrigation system, scheduling

irrigation only after checking

evapotranspiration data.

• The same will be complied with. Following

measures will be adopted to minimize water

requirement for landscaping :

• Native & xeriscaping plant species:

Choose native plant species that need less

water (list of the same is provided at point h

above).

• Creating Hydrozones: Grouping of plant

according to their water needs to provide

adequate water to all plants without over or

under-watering.

• Maintain Healthy Soil: Healthy soils are

the basis for a water-smart landscape; they

effectively cycle nutrients, minimize runoff,

retain water, and absorb excess nutrients,

Page 23: Final Compliance report Check - nromoef.gov.innromoef.gov.in/SMPR/26082015/58.pdfCompliance Report of the conditions laid in the Environmental Clearance: ... (MBBR) PROJECT STATUS:-

Project : Group Housing Colony

Promoter : Aum Shree Hotels & Resorts Pvt Ltd.

Compliance Report of the conditions laid in the

Environmental Clearance: up to May 2015

EIA Coordinator

P a g e | 23

For Aum shree Hotels & Resorts Pvt. Ltd.

(Authorized Signatory)

sediments, and pollutants.

• Mulching: Incorporate mulch around shrubs

and garden plants to help reduce

evaporation, inhibit weed growth, moderate

soil temperature, and prevent erosion.

Adding organic matter and aerating soil can

improve its ability to hold water.

• Avoid watering during the heat of the day.

Water early in the morning to reduce the

evaporation rate

• Turfs will be avoided to the extent possible

• Central shut off valve will be provided

• Drip irrigation/ sprinkler irrigation system

will be used to conserve water.

i) Rain water harvesting for roof run-off and

surface run-off, as per plan submitted

should be implemented. Before recharging

the surface run off, pre-treatment through

sedimentation tanks must be done to

remove suspended matter, oil and grease.

The bore well for rain water recharging

shall be kept at least 5 mts. above the

highest ground water table. Care shall be

taken that contaminated water do not enter

any RWH pit .The project proponent shall

avoid Rain water Harvesting of first 10

minutes of rain fall .Roof top of the

building shall be without any toxic material

or paint which can contaminate rain water

.Wire mess and filter should be used

wherever use required.

Rain water harvesting (RWH) system for roof

run-off and surface run-off has been designed

and implemented as per the submitted plan &

GOI manual.

Surface run off from the roof top and the

paved areas will be channelized through storm

water network after pre-treatment to remove

oil & grease to remove suspended matter, oil

& grease and ensure the quality of water.

Details of rain water harvesting structures are

as under:

Design Parameters

Average annual rainfall 541 mm

Peak intensity of rainfall 45 mm/hr

Details of structures

Number of structures 17

Page 24: Final Compliance report Check - nromoef.gov.innromoef.gov.in/SMPR/26082015/58.pdfCompliance Report of the conditions laid in the Environmental Clearance: ... (MBBR) PROJECT STATUS:-

Project : Group Housing Colony

Promoter : Aum Shree Hotels & Resorts Pvt Ltd.

Compliance Report of the conditions laid in the

Environmental Clearance: up to May 2015

EIA Coordinator

P a g e | 24

For Aum shree Hotels & Resorts Pvt. Ltd.

(Authorized Signatory)

j) The ground water level and its quality

should be monitored regularly in

consultation with central Ground Water

Authority.

The ground water monitoring will done and

piezometric well will be constructed in

consultation with Central Ground Water

Authority.

k) A report on the energy conservation

measures conforming to energy

conservation norms finalized by Bureau of

Energy Efficiency should be prepared

incorporating details about building

material & technology, R&U Factors etc

and submitted to the SEIAA, Haryana in

three months’ time.

The detailed report on the energy conservation

measures conforming to energy conservation

norms finalized by Bureau of Energy

Efficiency shall be prepared submitted as

desired with subsequent compliance reports.

Energy conservation measures are detailed

below:

• Solar geysers will be used for meeting hot water requirement (top two floors).

• Energy efficient compact Fluorescent Lamps will be used as these CFL gives same

illumination with less wattage compare to GLS Lamps.

• Automatic Power Factor correction panel with capacitor will be used for Common Load &

Fixed Capacitor for Transformer to minimize the losses

• Day light integrated to reduce artificial lighting demand.

• Emphasis will be given on low maintenance, low wattage and longer life in selection of

chokes and lamps for all common area and external light fixtures.

• Following measures will be adopted to reduce the heat ingress inside the building:

o Recessed windows and Covered balconies to limit direct heat gains.

o The wall will be made with fly ash bricks, AAC blocks, plastered outside and water

proofing paint.

o Shading devices are being provided to shade to windows and external façade.

• Optimizing building envelop & window design to reduce cooling demand (by selecting

energy efficient low U value materials for envelop is application of high reflecting white

china mosaic tiles to terrace).

• All the lifts and other pumps will be provided with variable frequency drives (VFD) which

will help in cutting the energy demand by 23%

l) Energy conservation measures like LED lights will be used for lighting the areas

Page 25: Final Compliance report Check - nromoef.gov.innromoef.gov.in/SMPR/26082015/58.pdfCompliance Report of the conditions laid in the Environmental Clearance: ... (MBBR) PROJECT STATUS:-

Project : Group Housing Colony

Promoter : Aum Shree Hotels & Resorts Pvt Ltd.

Compliance Report of the conditions laid in the

Environmental Clearance: up to May 2015

EIA Coordinator

P a g e | 25

For Aum shree Hotels & Resorts Pvt. Ltd.

(Authorized Signatory)

installation of LED only for lighting the

areas outside the building and inside the

building should be integral part of the

project design and should be in place before

project commissioning. Use of solar panels

must be adapted to the maximum energy

conservation.

outside the building.

Solar Panels will be installed on the terrace

floor and will be used for meeting hot water

requirement.

m) The Project Proponent shall use zero ozone

depleting potential material in insulation,

refrigeration, air-conditioning and adhesive.

Project Proponent shall also provide Halon

Free fire suppression system.

The same will be complied with.

n) The solid waste generated should be

properly collected and segregated as per the

requirement of the MSW Rules, 2000 and

as amended from time to time. The bio

degradable waste should be treated by

appropriate technology at the site ear

marked within the project area and dry/inert

solid waste should be disposed off to the

approved sites for land filling after

recovering recyclable material.

About 2732 kg/day municipal solid waste will

be generated during the operational phase of

the project which will be collected and

segregated as per the Municipal Solid Waste

Rules 2000 and amended Rules, 2008.Details

for the same is given below :-

Collection and Segregation of waste:

• A door to door collection system will be provided .

• The vendors will be hired to provide separate plastic bags for dry recyclables and Bio-

Degradable waste.

• For commercial waste collection, adequate number of colour coded bins (Green and Blue &

dark grey separate for Bio-degradable and Non Bio-degradable) are proposed to be provided at

the strategic locations of the commercial area.

• Litter bin will also be provided in open areas like parks etc.

Treatment of waste:

Page 26: Final Compliance report Check - nromoef.gov.innromoef.gov.in/SMPR/26082015/58.pdfCompliance Report of the conditions laid in the Environmental Clearance: ... (MBBR) PROJECT STATUS:-

Project : Group Housing Colony

Promoter : Aum Shree Hotels & Resorts Pvt Ltd.

Compliance Report of the conditions laid in the

Environmental Clearance: up to May 2015

EIA Coordinator

P a g e | 26

For Aum shree Hotels & Resorts Pvt. Ltd.

(Authorized Signatory)

� Bio-Degradable wastes:

• STP sludge will be used for horticultural purposes as manure.

• Horticultural Waste will be composted and will be used for gardening purposes.

� Recyclable wastes:

Recyclable wastes like paper, plastic, metals etc. will be sold off to vendors.

o) The provision of the solar water heating

system shall be as per norms specified by

HAREDA and shall be made operational in

each building block.

The same will be complied with. Solar water

heating system will be installed as per

guidelines of Haryana Renewable Energy

Development Agency (HAREDA).

p) The traffic plan and the parking plan

proposed by the project proponent should be

adhered to meticulously with further scope

of additional parking for future

requirements. There should be no traffic

congestion near the entry and exit points

from the roads adjoining the proposed

project site .Parking should be fully

internalized and no public space should be

used.

Adequate parking will be provided to avoid

traffic congestion near the entry and exit

points. The movement pattern inside the

project area will be guided traffic ways with

one-way traffic movement to avoid traffic

congestion. Fully internalized parking

facilities will be provided at basement, stilt

and open surfaces at well designated parking

places and no public space will be utilized for

the same.

q) The Project shall be operationalized only

when HUDA/local authority will provide

domestic water supply system in the area.

The content of para (q) are noted and will be

followed.

r) Operation and maintenance of STP, solid

waste management and electrical

Infrastructure, pollution control measures

shall be ensured even after the completion of

project.

The same will complied with.

s) Different type of waste should be disposed

off as per provisions of municipal solid

waste, biomedical waste, hazardous waste,

e-waste, batteries & plastic rules made under

Hazardous waste or bio medical waste will not

be generated from the project. However, the

municipal solid waste generated from the

project will be handled as per the Municipal

Page 27: Final Compliance report Check - nromoef.gov.innromoef.gov.in/SMPR/26082015/58.pdfCompliance Report of the conditions laid in the Environmental Clearance: ... (MBBR) PROJECT STATUS:-

Project : Group Housing Colony

Promoter : Aum Shree Hotels & Resorts Pvt Ltd.

Compliance Report of the conditions laid in the

Environmental Clearance: up to May 2015

EIA Coordinator

P a g e | 27

For Aum shree Hotels & Resorts Pvt. Ltd.

(Authorized Signatory)

Environment Protection Act, 1986.

Particularly E-waste and battery waste shall

be disposed of as per existing E-waste

management Rules 2011 and Batteries

management Rules 2001.The project

proponent should maintain a collection

center for E-waste and it shall be disposed of

to only registered and authorised

dismantler/recycler.

Solid Waste (Management & Handling) Rules.

The same is detailed in point number (d)

above. E-Waste and battery waste generated

from the project will be disposed off as per

norms and rules.

t) Standard discharge of environment

pollutants as enshrines in various schedules

of rule 3 of Environment Protection Rule

1986 shall be strictly complied with.

The same will be complied with.

u) Water supply shall be metered among

different users and different utilities.

The same will be complied with. Water meter

will be installed to monitor the water usage at

the following points:

� Fresh water intake

� Inlet of flushing tanks

� STP inlet

� STP outlet

� Landscaping

v) The project proponent shall ensure that the

use of DG sets is more than the highest

tower and also ensure that the emission

standards of noise and air are within the

CPCB latest prescribed limits. Noise and

Emission level of DG set greater than 800

KVA shall be as per CPCM latest standards

for high capacity DG sets.

The same will be complied with. DG sets will

be provided with effective stack height as per

the norms of CPCB. Details of DG Sets and

stack heights are given at point no. (e) above.

w) All electric supply exceeding 100 amp, 3

phases shall maintain the power factor

The same are noted and will be followed.

Page 28: Final Compliance report Check - nromoef.gov.innromoef.gov.in/SMPR/26082015/58.pdfCompliance Report of the conditions laid in the Environmental Clearance: ... (MBBR) PROJECT STATUS:-

Project : Group Housing Colony

Promoter : Aum Shree Hotels & Resorts Pvt Ltd.

Compliance Report of the conditions laid in the

Environmental Clearance: up to May 2015

EIA Coordinator

P a g e | 28

For Aum shree Hotels & Resorts Pvt. Ltd.

(Authorized Signatory)

between 0.98 lag to 1 at the point of

connection.

x) The project proponent shall not use fresh

water HVAC and DG cooling. Air based

HVAC system should be adopted and only

treated water shall be used by project

proponent for cooling. If it is at all needed.

The project proponent shall also use

evaporative for cooling technology and

double stages cooling system for HVAC in

order to reduce water consumption .Further

temperature, relative humidity during

summer and winter seasons should be kept

at optimal level. Variable speed drive, best

Co-efficient of Performance (Cop), as well

as optimal Integrated Point Load value and

minimum outside fresh air supply may be

resorted for conservation of power and

water. Coil type cooling DG sets shall be

used for saving cooling water consumption

for water cooled D.G sets.

The same will be complied with.

y) The project proponent shall ensure that the

transformer is constructed with high quality

grain oriented, low loss silicon steel and

virgin electrolyte grade copper. The project

proponent shall obtain manufacturer’s

certificate also for that.

The contents of para (y) are noted and will be

complied with.

z) The project proponent shall ensure that exit

velocity from the stack should be

sufficiently high. Stack shall be designed in

such a way that there is no stack down-wash

The same will be complied with.

Page 29: Final Compliance report Check - nromoef.gov.innromoef.gov.in/SMPR/26082015/58.pdfCompliance Report of the conditions laid in the Environmental Clearance: ... (MBBR) PROJECT STATUS:-

Project : Group Housing Colony

Promoter : Aum Shree Hotels & Resorts Pvt Ltd.

Compliance Report of the conditions laid in the

Environmental Clearance: up to May 2015

EIA Coordinator

P a g e | 29

For Aum shree Hotels & Resorts Pvt. Ltd.

(Authorized Signatory)

under any meteorological conditions.

aa The project proponent shall provide water

sprinkling system in the project area to

suppress the dust in addition to the already

suggested mitigation measures in the Air

Environment Chapter of EMP.

The same will be complied with.

ab The project proponent shall ensure proper

Air Ventilation and light system in the

basements area for comfortable living of

human being and shall ensure that number of

Air changes per hour/(ACH) in basement

never falls below 15.In case of emergency

capacity for increasing ACH to the extent of

30 must be provided by the project

proponent.

The same will be complied with.

ac The project proponent shall ensure drinking

/domestic water supply as per prescribed

standard till treated water supply is made

available by HUDA.

The same will be complied with.

PART B: GENERAL CONDITION

i. The project proponent shall ensure the

commitments made in Form-1, Form-1A,

EIA/EMP and other documents submitted to the

SEIAA for the protection of environment and

proposed environmental safeguards are

complied with in letter and spirit.

The contents of para (i) are noted and

will be complied with.

ii. The project proponent shall also submit Six

monthly reports on status of compliance of the

stipulated EC conditions including results of

monitored data (both in hard copies as well as

The same will be noted and complied

with.

Page 30: Final Compliance report Check - nromoef.gov.innromoef.gov.in/SMPR/26082015/58.pdfCompliance Report of the conditions laid in the Environmental Clearance: ... (MBBR) PROJECT STATUS:-

Project : Group Housing Colony

Promoter : Aum Shree Hotels & Resorts Pvt Ltd.

Compliance Report of the conditions laid in the

Environmental Clearance: up to May 2015

EIA Coordinator

P a g e | 30

For Aum shree Hotels & Resorts Pvt. Ltd.

(Authorized Signatory)

by e-mail) to the northern Regional office of

MoEF, the repective Zonal Office of CPCB,

HSPCB and SEIAA Haryana.

iii. STP outlets after stabilization and stack

emission shall be monitored monthly. Other

environmental parameters and green belt shall

be monitored on quarterly basis. After every 3

months, the project proponent shall conduct

environmental audit and shall take corrective

measure, if required, without delay.

The same will be complied with.

iv. The SEIAA Haryana, reserves the right to add

additional safeguards measures subsequently, if

found necessary. Environmental Clearance

granted will be revoked if it is found that false

information has been given for getting approval

of this project. SEIAA reserves the right to

revoke the clearance if conditions stipulated are

not implemented to the satisfaction of

SEIAA/MoEF.

If any additional safeguards measures

will be given, it will be followed and

complied.

v. The project proponent shall not violate any

judicial orders/ pronouncements issued by the

Hon’ble Supreme Court/High Courts.

We will try to the best possible extent not

to violate any judicial orders/

pronouncements issued by the Hon’ble

Supreme Court/High Courts.

vi. All other statutory clearances such as the

approvals for storage of diesel from Chief

Controller of Explosive, Fire Department, Civil

Aviation Department, Forest Conservation Act,

1980 and Wildlife (Protection) Act 1972, Forest

Act 1927, PLPA 1900, etc. shall be obtained, as

applicable by project proponents from the

respective authorities prior to construction of

The same will be complied with as per

applicability on the project.

Forest Clearance under Forest

Conservation Act is not applicable as

there is no forest land involved in the

project. The copy of certificate obtained

from Dy. Conservator of Forests,

Gurgaon is enclosed as Annexure VI.

Page 31: Final Compliance report Check - nromoef.gov.innromoef.gov.in/SMPR/26082015/58.pdfCompliance Report of the conditions laid in the Environmental Clearance: ... (MBBR) PROJECT STATUS:-

Project : Group Housing Colony

Promoter : Aum Shree Hotels & Resorts Pvt Ltd.

Compliance Report of the conditions laid in the

Environmental Clearance: up to May 2015

EIA Coordinator

P a g e | 31

For Aum shree Hotels & Resorts Pvt. Ltd.

(Authorized Signatory)

the project.

vii. The project proponent should inform the public

that the project has been accorded

Environmental Clearance by the SEIAA and

copies of the clearance letter are available with

the State Pollution Control Board & SEIAA.

This should be advertised within 7 days from

the date of issue of the clearance letter at least

in two local newspapers that are widely

circulated in the region and the copy of the

same should be forwarded to SEIAA Haryana.

A copy of Environment Clearance conditions

shall also be put on project proponent’s web site

for public awareness.

The same will be complied with. The

copy of the newspaper advertisement is

enclosed as Annexure VII.

viii Under the provision of Environment

(Protection) Act, 1986, legal action shall be

initiated against the project proponent it was

found that construction of the project has been

started before obtaining prior Environmental

Clearance.

The content of para viii are noted and

undisputed.

ix. Any appeal against this Environmental

Clearance shall lie with the National Green

Tribunal, if preferred, within a period of 30

days as prescribed under Section 16 of the

National Green Tribunal Act, 2010.

The content of para ix are noted and

undisputed.

x. The project proponent shall put in place

Corporate Environment Policy as mentioned in

MoEF, GoI OM No. J-11013/41/2006-IA II (I)

dated 26.04.2012.within 3 months period

.Latest Corporate Environment Policy should be

submitted to SEIAA within 3 months of

The same will be complied with.

Page 32: Final Compliance report Check - nromoef.gov.innromoef.gov.in/SMPR/26082015/58.pdfCompliance Report of the conditions laid in the Environmental Clearance: ... (MBBR) PROJECT STATUS:-

Project : Group Housing Colony

Promoter : Aum Shree Hotels & Resorts Pvt Ltd.

Compliance Report of the conditions laid in the

Environmental Clearance: up to May 2015

EIA Coordinator

P a g e | 32

For Aum shree Hotels & Resorts Pvt. Ltd.

(Authorized Signatory)

issuance of this letter.

xi. The fund ear-marked for environment

protection measures should be kept in separate

account and should not be diverted for other

purposes and year wise expenditure shall be

reported to the SEIAA/RO MoEF GoI under

rules prescribed for Environmental Audit.

The same will be complied with.

xii. The project proponent shall ensure the

compliance of Forest Department, Haryana

Notification no.S.O.121/PA2/1900/S.4/94 dated

28.11.1997

The same will be complied with.

xiii The project proponent shall ensure that no

vehicle during construction /operation phase

enter the project premises without valid

‘Pollution Under Control’ certificate from

competent Authority.

The same will be complied with. PUC

certified vehicle will be used during

construction phase of the project

xi. The project proponent is responsible for

compliance of all conditions in Environment

Clearanace letter and project proponent cannot

absolve himself /herself of the responsibility by

shifting it to any contractor engaged by project

proponent.

The project proponent is responsible for

compliance of all conditions in

Environmental Clearance letter.

xv. The project proponent shall seek fresh

Environment clearance if at any stage there is

change in the planning of the proposed project.

The same will be followed.

xvi Besides the developer/applicant ,the

responsibility to ensure the compliance of

Environmental Safeguards/conditions imposed

in the Environmental Clearance letter shall also

lie on the licensee/licensees in whose

name/names the license/CLU has been granted

The same will be complied with.

Page 33: Final Compliance report Check - nromoef.gov.innromoef.gov.in/SMPR/26082015/58.pdfCompliance Report of the conditions laid in the Environmental Clearance: ... (MBBR) PROJECT STATUS:-

Project : Group Housing Colony

Promoter : Aum Shree Hotels & Resorts Pvt Ltd.

Compliance Report of the conditions laid in the

Environmental Clearance: up to May 2015

EIA Coordinator

P a g e | 33

For Aum shree Hotels & Resorts Pvt. Ltd.

(Authorized Signatory)

by the Town & country Planning Department

,Haryana.

xvii. The proponent shall upload the status of

compliance of the stipulated EC conditions,

including results of monitored data on their

website and shall update the same periodically.

It shall simultaneously be sent to the Regional

Office of MoEF ,the respective Zonal Office of

CPCB and the SPCB .The criteria pollutant

level namely ; PM2.5, PM10, SOX, NOX, Ozone,

Lead, CO, benzene, Ammonia, Benzopyrine,

arsenic and Nickel. (Ambient level as well as

stack emissions) or crictical sectoral

parameters, indicated for the project shall be

monitored and displayed at a convenient

location near the main gate of the company in

the public domain.

The same will be noted and followed.

xviii The Environment statement for each financial

year ending 31st march in Form V as is

mandated to be submitted by the project

proponent to HSPCB Panchkula as prescribed

under the Environment (Protection) Rules,

1986, as amended subsequently, shall also be

put on the website of the company along with

the status of the compliance of EC conditions

and shall also to be respective Regional Office

of MoEF by e-mail.

The same will be noted and followed.

xix. The project proponent shall conduct

environment audit at every three months

interval and thereafter corrected measures shall

be taken without any delay. Details of

The same is noted and will be followed.

Page 34: Final Compliance report Check - nromoef.gov.innromoef.gov.in/SMPR/26082015/58.pdfCompliance Report of the conditions laid in the Environmental Clearance: ... (MBBR) PROJECT STATUS:-

Project : Group Housing Colony

Promoter : Aum Shree Hotels & Resorts Pvt Ltd.

Compliance Report of the conditions laid in the

Environmental Clearance: up to May 2015

EIA Coordinator

P a g e | 34

For Aum shree Hotels & Resorts Pvt. Ltd.

(Authorized Signatory)

environmental audit and corrective measures

shall be submitted in the monitoring report.

For “Aum Shree Hotels & Resorts Pvt Ltd”

(Authorized Signatory)

***********