Final BOEM Houston Sept 7

Embed Size (px)

Citation preview

  • 8/12/2019 Final BOEM Houston Sept 7

    1/26

    PresenterLogo

    BOEMRE Public Forum

    Houston, Texas

    September 7, 2010

  • 8/12/2019 Final BOEM Houston Sept 7

    2/26

    PresenterLogoBOEMREand

    Industry

    have

    Shared

    Objectives

    MakeimprovementstoreduceriskandincreaseenvironmentalprotectionssoatragedyliketheDeepwaterHorizonneverhappensagain

    ReturntodrillingintheGulfofMexico

  • 8/12/2019 Final BOEM Houston Sept 7

    3/26

    PresenterLogoDOI/BOEMREsClear,

    Consistent

    Direction

    Improvementneededinthreeareasbeforedrillingwillbe

    allowed:

    Prevention ofanotherblowout

    Demonstrateincreasedintervention

    capability

    Demonstrateincreasedoil

    spillresponsecapability

    Industryhasheardthemessageloudandclear

  • 8/12/2019 Final BOEM Houston Sept 7

    4/26

    PresenterLogoEnergyIndustry

    Response

    CreatedfourJointIndustryTaskForcestoattackthese

    issues

    Prevention

    OperatingProceduresTaskForce

    (ChairmanJohnPeters,

    Chevron)

    EquipmentTaskForce

    (ChairmanAlanSummers,Diamond

    OffshoreDrilling)

    Intervention

    SubseaInterventionandContainmentTaskForce(ChairmanCharlieWilliams,Shell)

    SpillResponse

    OilSpillResponseTaskForce (CoChairmenJayCollins,Oceaneering,KeithRobson,Marathon)

  • 8/12/2019 Final BOEM Houston Sept 7

    5/26

    PresenterLogo

    OperatingProcedures

    Task

    Force

    JITF met ~2 weeks in May to develop recommendations for DOI.

    Focused on (5) areas:

    1. Cementing refer to API RP65 Part 2

    2. Loads and Resistance

    Lock casing hanger assembly into subsea wellhead when installing casing

    Develop deepwater well design considerations (now API RP 96)

    3. Fluid Displacement and Negative Testing

    Close BOP on pipe & circulate thru choke line to prevent gas entry to riser

    Monitor displacement volumes in and out of wellbore

    Position shearable components across shear rams

    4. Abandonment and Barriers

    Recommend two or more independent barriers for each flow path

    Verification

    5. Adopt Safety Case & develop Well Construction Interface Doc (WCID)

  • 8/12/2019 Final BOEM Houston Sept 7

    6/26

    PresenterLogo

    Operating Procedures Task Force

    API RP96 Deepwater Well Design Considerations

    LoadandDesignConsiderations

    HTHP,MASP,Cement,Buckling

    Hanger,LinerTopPacker

    Csg wear,APB

    Driveoff

    ETC,Etc,etc.

    Barrier

    Install,

    Verify

    &

    Manage

    Barriertestmethod

    Nontestablebarriers

    Fluid

    displacements

    ETC,Etc,etc.

    ManagementofChange

    Standard/ReferenceReview

  • 8/12/2019 Final BOEM Houston Sept 7

    7/26

    PresenterLogoAPI RP 96 Deepwater Well Design ConsiderationsForward Plan

    Complete

    Kick

    off

    meeting

    Developinitialoutline

    Organizeintosubteamsand

    select

    sub

    team

    leads

    Subteamsmeetandadd

    contenttooutline

    SelectEngineeringConsultant

    astech

    writer

    Reviewandvetsubteamwork

    Begindraft#1

    InProgress

    Review

    draft

    #1

    Outstanding

    Update

    draft

    #2

    1stBallotforconsensus

    Draft#3(ifnecessary)

    2ndBallot(ifnecessary)

    PublishAPI

    RP961stEdition

  • 8/12/2019 Final BOEM Houston Sept 7

    8/26

    PresenterLogo

    Operating Procedures Task Force

    Well Construction Interfacing Document (WCID)

    Wellconstructioninterface/Basisofdesign

    Location&environment

    Geologicandgeophysical

    Welldesign

    Wellbarriers(withmuchdetail)

    Casingdesign

    Wellexecutionplan(withdetail)

    CriticalwellRiskAssessments

    Operators

    MOC

    DrillingcontractorsafetycaseandleaseoperatorSMSinterface

    Managementstructure/RRs/Acct

    Drilling

    Contractor

    MOC

    Personnelmanagement

    Wellcontrolprocedures

    Riskmanagementprocesses

    Emergency

    response

    Monitoring,auditingandreview

  • 8/12/2019 Final BOEM Houston Sept 7

    9/26

    PresenterLogoWCID Plan Forward Complete

    Sub

    Team

    Kick

    Off

    meeting

    DevelopinitialWCID

    guidelinesoutline

    Sub

    Team

    vet

    WCID

    outline

    withJITFProceduresGroup

    Subteamdevelopsadditional

    detailandexplanation

    Seek

    additional

    comment

    from

    JITFProceduresGroupand

    BOEM

    InProgress

    Sub

    team

    updates

    draft

    WCID

    Outstanding

    WCID

    and

    Safety

    Case

    Workshops

    Release1steditionofWCID

    Guidelinesforgeneraluseby

    Industry

  • 8/12/2019 Final BOEM Houston Sept 7

    10/26

    PresenterLogoOffshoreEquipment

    Task

    Force

    ReviewingCurrentBOPEquipmentDesigns,

    TestingProtocols,RegulationsandData

    SecondaryBOPControlSystems

    BOPTestingandTestData

    RemotelyOperatedVehicles

    AddressingHealth,Safety&EnvironmentCase

    Over60Participants;Over30Organizations

  • 8/12/2019 Final BOEM Houston Sept 7

    11/26

    PresenterLogoOffshoreEquipment

    Task

    Force

    Workgroups

    ShearingWorkgroup

    Workonhavingtheindustryshareallshearingdata

    EquipmentOEMsarecheckingonstoringandmaintainingtheinformationontheircompanywebsitesforeasyaccessbytheindustry

    ROVWorkgroup

    WorkonROVunitstandardsforGOMthatarereasonablefor

    currenttechnology

    AcousticWorkgroup

    InvestigateAcousticreliability,history,learningsfromMacondo,

    etc.

  • 8/12/2019 Final BOEM Houston Sept 7

    12/26

    PresenterLogo

    OffshoreEquipmentTaskForce

    Recommendations/CommentstotheBOEMREon

    interimfinal

    rule

    Notfinalized,stillbeingworked

  • 8/12/2019 Final BOEM Houston Sept 7

    13/26

    PresenterLogoSubsea

    Well

    Control

    and

    ContainmentTaskForce

    Addressingsubseainterventionandcontainment

    onawellfollowingaBOPfailureorfailureallowing

    flowoutsideofthecasingatthewellhead.

    DoesnotincludetheBOPsorBOPcontrolsystems

    otherthan

    ROV

    intervention

    Over30participants/Over20organizations

  • 8/12/2019 Final BOEM Houston Sept 7

    14/26

    PresenterLogo

    SubGroups

    WellContainmentattheSeafloor

    SealingConnectiontotheWellorSeafloor

    TopKillProcedures&Methods

    ExistingEquipmentModification

    InterventionandContainmentWithintheSubseaWell

    ReliefWells

    DynamicKill

    DirectMechanicalInterventioninsidetheWell

    o SubseaSnubbing;

    Coil

    Tubing;

    Packers/Mechanical

    Barriers;

    Reactant

    Pills

    SubseaCollectionandSurfaceProcessing&Storage

    WellProductionCaptureSystems

    o WithSealingtotheWell

    o WithNo

    Sealing

    directly

    to

    Well

    o DispersedFlowfromtheseafloor

    14

    SubseaWell

    Control

    and

    ContainmentTaskForce

  • 8/12/2019 Final BOEM Houston Sept 7

    15/26

    PresenterLogo

    Identified

    29

    recommendations,

    including

    15

    immediateactionitems

    Recommendationsfocused

    on

    5areas:

    WellContainmentattheSeafloor

    InterventionandContainmentwithintheSubseaWell

    SubseaCollectionandSurfaceProcessingandStorage

    ContinuingR&D

    ReliefWells15

    SubseaWell

    Control

    and

    ContainmentTaskForce

  • 8/12/2019 Final BOEM Houston Sept 7

    16/26

    PresenterLogo

    15ImmediateActionItems

    Industrymustown/providecontainmenttechnology&capability

    Develop

    capability

    to

    remove

    LMRP

    from

    BOP

    using

    asurface

    intervention

    vessel

    &

    ROV

    DevelopnewmethodstoreleaseLMRPwithoutrisertension

    DevelopcapabilitytoremovedamagedBOPforinstallationofnew

    BOP

    inspecialsituations

    Develop

    capability

    to

    regain

    full

    functionality

    of

    BOP

    stack

    ContainmentCapabilitytobeprovidedviaContainmentCompany(CC)

    ContainmentCompany

    procure,construct&testneededequipment

    CoordinatewithEquipmentTFoncontrolfluidsforBOPs&ROVs

    Coordinate

    with

    API

    RP96

    on

    Deepwater

    Well

    Design

    EvaluateconceptspresentedtoBOEMREAlternativeResponseTechnologiesProgram

    CCtodeliverrapiddeploymentmodularproductionsolution

    Develophistoricaldocumentonmarinewellcontrolandcontainment

    Recommendmosteffectivemethodtoincludereliefwellplansinwellplans

    Develophistoricaldocumentonreliefwells

    DevelopWhitePaperonfeasibilityanddesirabilityofreliefwells (Complete)

    SubseaWellControland

    ContainmentTask

    Force

  • 8/12/2019 Final BOEM Houston Sept 7

    17/26

    PresenterLogo

    ContainmentCompany

    Mustprovideflexible&adaptablesystemsto

    containthewellsubsea&provide

    subseaproduction

    capabilityviasubsea

    equipment,risers,&

    containmentvesselsthatwillsafelycapture,

    storeandoffloadtheoil

  • 8/12/2019 Final BOEM Houston Sept 7

    18/26

    PresenterLogoOil

    Spill

    Response

    Task

    Force

    OILSPILLRESPONSEPLANS

    Currentresponseplanformatandcontentwillbeassessedandaddressedappropriately.

    Likely

    improvements:

    Themannerinwhichresponsecanberampedup

    Contentandstructure

    Coordination

    with

    regulatory

    agencies Trainingandexercisesforlargespillevents

    Propermanagementoversightandattentiontodetail

    Possible

    development

    of

    API

    Recommended

    Practice

  • 8/12/2019 Final BOEM Houston Sept 7

    19/26

  • 8/12/2019 Final BOEM Houston Sept 7

    20/26

    PresenterLogo

    OilSpill

    Response

    Task

    Force

    DISPERSANTS

    Knowledgegapsandmisperceptionsofdispersantseffectedtheextentofuse.

    Needacommon

    understanding

    of

    dispersant

    use

    and

    products

    Riskbenefitsandeffectiveness

    Safety

    Researchisneededtorefinesubseainjectionapproach

    Researchisneededonthebehaviorandlongtermfateofdispersedoil

    inthe

    water

    column

    when

    dispersants

    are

    applied

    at

    the

    sea

    floor

  • 8/12/2019 Final BOEM Houston Sept 7

    21/26

    PresenterLogo

    OilSpill

    Response

    Task

    Force

    INSITUBURNING

    Likedispersants,bothknowledgegapsandmisperceptionsofinsituburneffectedtheiruse

    Needcommon

    understanding

    of

    in

    situ

    burning

    Benefits

    Limitations

    Safety Researchshouldfocusonfireboomperformance

    Currenttechnologylimitation

    Performanceparameters

  • 8/12/2019 Final BOEM Houston Sept 7

    22/26

    PresenterLogo

    OilSpill

    Response

    Task

    Force

    MECHANICALRECOVERYSYSTEMS

    Keyareasforimprovementshouldbeidentifiedandrealisticexpectationsmustbeestablished

    Continueincrementalimprovementinboomandskimmerdesign;

    RevisitEffective

    Daily

    Recovery

    Capacity

    (EDRC)

    calculation

    for skimmers,whichcontributestounrealisticexpectations

    Developtheabilitytofunctioninhigherseastatesandcurrent

  • 8/12/2019 Final BOEM Houston Sept 7

    23/26

    PresenterLogo

    OilSpill

    Response

    Task

    Force

    SHORELINECLEANUPANDPROTECTION

    Knowledgeandsafetyofindividualsinvolvedarekeyareasoffocus

    Increasethe

    number

    of

    trained

    responders

    available

    Strengthencommandandcontrolprotocols

    Localinvolvementinplanningefforts

    Ensureacooperativejointresponseeffort

    Addressancillaryissues

    PreparationofupdatedESImapping

    Localconditionsshouldeffectsafetyandpersonalprotective

    equipmentrequirements

  • 8/12/2019 Final BOEM Houston Sept 7

    24/26

    PresenterLogo

    OilSpill

    Response

    Task

    Force

    ALTERNATIVERESPONSETECHNOLOGIES

    Focusonboththetechnologyandtheprocesstointroduce

    andadvancenew,viabletechnology

    Continuesupportofinnovationinoilspillresponse

    Develop

    a

    clear

    process

    and

    responsible

    organization

    to

    evaluateanddevelopideas

  • 8/12/2019 Final BOEM Houston Sept 7

    25/26

  • 8/12/2019 Final BOEM Houston Sept 7

    26/26

    PresenterLogoSummary

    Significantprogressmadetoimproveprevention,

    interventionand

    spill

    response

    Webelieveenoughprogresshasbeenmadetolift

    thedrilling

    suspension

    now

    Webelieveenoughprogresshasbeenmadetoacceleratetheissuanceofdrillingpermits Wearecommittedtomakingfurtherprogress