    Leverage BudgetManagement Functionality

    in SAP to AdministerBudgets for Projects,Internal Orders,and Cost Centers

    Michael PrakhinaLazar Consultants

  • 8/9/2019 FIN2008 Prakhina Leverage Budget Management

    2/57

    In This Session

    This session examines strategies for configuring and

    deploying SAP applications to support BudgetManagement scenarios

    Review functionality available across the SAP landscape

    to manage budgets and receive best practices for

    streamlining the budgeting processes for projects,

    internal orders, and cost centers

    Get a handle on budgeting for more than one currency

    Examine the prerequisites for budget allocation and walkthrough configuration of Budget Management

    functionality for projects and internal orders

    1

  • 8/9/2019 FIN2008 Prakhina Leverage Budget Management

    3/57

    In This Session (cont.)

    Learn how to compare actual postings versus budgets

    using cost center budget planning functionality Understand the impact that purchase order and invoices

    have on budget through Commitments Management

    Get unique tips for displaying budget line items, andlearn how to run budget update reports

    Get tips for approving and releasing the budget on the

    Internet

    2

  • 8/9/2019 FIN2008 Prakhina Leverage Budget Management

    4/57

    33

    What Wel l Cover ...

    Overview of Budget Management in SAP ERP 6.0

    Availabil ity Control

    Commitments Management (CO)

    Budget Management for Cost Centers

    Budget Management for Internal Orders Budget Management for Projects

    Web-Enabled Budgeting in SAP ERP 6.0

    Wrap-up

  • 8/9/2019 FIN2008 Prakhina Leverage Budget Management

    5/57

    What Is Budgeting?

    Budget is the device by which management approves

    the expected development of order costs over a giventimeframe

    4

  • 8/9/2019 FIN2008 Prakhina Leverage Budget Management

    6/57

    Planning vs. Budgeting

    5

    You administrate the approved cost framework for anorder or an order group using Budget Management

    You can enter the order budget manually or copy budget

    information from any plan version

    The budget is the

    approved coststructure for anorder or a project

  • 8/9/2019 FIN2008 Prakhina Leverage Budget Management

    7/57

    Budget Types

    Original budget

    This is the budget originally assigned, before any updates weremade.

    Budget updates Unforeseen events, additional requirements, for example, price

    rises for external activi ties, and so on. This may mean you needto update the original budget, in the form of:

    Supplements

    Returns

    Current budget This is derived from the budget types

    already mentioned:

    6

  • 8/9/2019 FIN2008 Prakhina Leverage Budget Management

    8/577

    How Budgeting Works

    To create a budget for an order, you must define a budget prof ile and assign it

    to the order type

    The budget profile defines the parameters for budgeting

    In Customizing, you must define a number range for your budget documents

    When you save the budget, the system checks that the sum of the annual

    values matches the overall value for the order

    Order: 400010

    Budget Line ItemsOrder 400010 Chicago Trade Fair

    Document Year Activity Amount ...

    Total 2000 19,000

    Original CurrentBudget Budget

    Overall 40,000 50,000

    2000 15,000 19,0002001 15,000 18,0002002 2,000 3,0002003 3,000 4,000

    030000001 2000 Original 15,000

    030000200 2000Supplement 5,000

    030000306 2000Return 1,000-

    You can: Update and make changes

    to the budget

    Freeze the budget using

    status management

    Display the budget line

    items from the budgetscreen

    Enter text for budget line

    items to provide supporting

    information for the budget

    transaction

  • 8/9/2019 FIN2008 Prakhina Leverage Budget Management

    9/57

    Define Budget Profile

    To create a budget for an order, you must define a

    budget profi le and assign it to the order type

    8

    The budgetprofile definesthe parametersfor budgeting

    Is AvailabilityControl activatedmanually orautomaticallyduring budgeting?

  • 8/9/2019 FIN2008 Prakhina Leverage Budget Management

    10/57

    Things to Remember

    The budget represents the funds approved by the

    management. The budget types include the originalbudget, budget updates, and the current budget.

    Line items are recorded for updates to the order budget.

    To create a budget, you must define a budget profile andassign it to the order type or the project definit ion.

    9

  • 8/9/2019 FIN2008 Prakhina Leverage Budget Management

    11/571010

    What Wel l Cover

    Overview of Budget Management in SAP ERP 6.0

    Availabil ity Control

    Commitments Management (CO)

    Budget Management for Cost Centers

    Budget Management for Internal Orders Budget Management for Projects

    Web-Enabled Budgeting in SAP ERP 6.0

    Wrap-up

  • 8/9/2019 FIN2008 Prakhina Leverage Budget Management

    12/57

    What Is Availabil ity Control?

    11

    As an order or project is executed, business events are recorded that call uponavailable funds

    These events result in the posting of actual costs and commitments to the order

    or project

    Commitments represent obligations that lead to actual costs through subsequent

    business events; e.g., a purchase order may result in a CO commitment

    Is availability control

    active?

    For which transactionswill availability controlapply?

    What are the tolerancelimits?

  • 8/9/2019 FIN2008 Prakhina Leverage Budget Management

    13/57

    How Budgeting Works with Availability Control

    Use tolerances to

    define how the

    system should

    respond to a given

    degree of budget

    overrun

    12

  • 8/9/2019 FIN2008 Prakhina Leverage Budget Management

    14/57

    Budget Carry Forward

    13

    You can transfer unusedfunds to the next fiscal yearusing the budget carry

    forward function SAP carries forward the

    difference between thebudget and actual amountsfor the year specified

  • 8/9/2019 FIN2008 Prakhina Leverage Budget Management

    15/57

    Budgeting in Different Currencies

    14

    You can choosedifferent currenciesto enter your budget

    All budget items are

    converted and savedautomatically in thecontrolling areacurrency and theobject currency

  • 8/9/2019 FIN2008 Prakhina Leverage Budget Management

    16/57

    Things to Remember

    Unused budget amounts can be carried forward to the

    next fiscal year. ERP system can perform active availabil ity checks when

    the order is debited. The ERP system checks whether

    the order budget is adequate for the actual posting or

    commitment.

    In Customizing, you specify the system response if

    tolerance levels were exceeded.

    Budget can be entered in the controlling area currency,object currency, or a user-defined currency.

    15

  • 8/9/2019 FIN2008 Prakhina Leverage Budget Management

    17/57

    1616

    What Wel l Cover

    Overview of Budget Management in SAP ERP 6.0

    Availabil ity Control

    Commitments Management (CO)

    Budget Management for Cost Centers

    Budget Management for Internal Orders Budget Management for Projects

    Web-Enabled Budgeting in SAP ERP 6.0

    Wrap-up

  • 8/9/2019 FIN2008 Prakhina Leverage Budget Management

    18/57

    About Commitments Management

    17

    By recording commitments as well as actual costs, you can

    compare the funds you have allocated to your budgeted cost to

    determine funds availability

  • 8/9/2019 FIN2008 Prakhina Leverage Budget Management

    19/57

    Commitments Carry Forward

    You can carry forward open commitment values into the

    first period of the next fiscal year as part of year-endclosing

    18

  • 8/9/2019 FIN2008 Prakhina Leverage Budget Management

    20/57

    Types of Commitments Management

    There are three types of commitments, depending on

    the account assignment object: Order commitment

    The commitment is initially assigned to an order

    Cost center commitment

    The commitment is initially assigned to a cost center

    Project commitment

    The commitment is ini tially assigned to a project or to a

    work breakdown structure element

    19

  • 8/9/2019 FIN2008 Prakhina Leverage Budget Management

    21/57

    Activate Commitments Management

    You activate Commitments Management:

    For each controlling area from a chosen fiscal year For orders per order type

    For cost centers

    For cost centers per cost center type

    20

    Tip

  • 8/9/2019 FIN2008 Prakhina Leverage Budget Management

    22/57

    Commitments Reports

    In addit ion to the actual values and budget values, this

    report displays commitment values

    21

  • 8/9/2019 FIN2008 Prakhina Leverage Budget Management

    23/57

    Things to Remember

    Commitments are specific goods ordered for an internal

    order, a cost center, or a project A purchase order commitment is created that is

    equivalent to the purchase order value

    Commitments are reduced by business transactions(such as goods receipts) and actual costs are incurred

    by the corresponding account assignment object

    At year-end closing, you can carry open commitment

    values

    22

  • 8/9/2019 FIN2008 Prakhina Leverage Budget Management

    24/57

    2323

    What Wel l Cover

    Overview of Budget Management in SAP ERP 6.0

    Availabil ity Control Commitments Management (CO)

    Budget Management for Cost Centers

    Budget Management for Internal Orders Budget Management for Projects

    Web-Enabled Budgeting in SAP ERP 6.0

    Wrap-up

  • 8/9/2019 FIN2008 Prakhina Leverage Budget Management

    25/57

    Define a Budget Profile for Cost Centers

    You create a budget profile to specify technical and

    administration values for budgeting by cost center

    24

  • 8/9/2019 FIN2008 Prakhina Leverage Budget Management

    26/57

    Maintain Cost Center Budget Information

    Entering cost center budget is simple! You can enter i t

    manually, copy/paste, or just simply upload from

    spreadsheets 25

    You canmanually enter

    budget for costcenters

    Use Excel toupload valuesautomatically

  • 8/9/2019 FIN2008 Prakhina Leverage Budget Management

    27/57

    Cost Center Budget Planning in Excel Type Report

    26

  • 8/9/2019 FIN2008 Prakhina Leverage Budget Management

    28/57

    Cost Center Budget and Commitments Reports

    27

    Via the Report/ReportInterface you canbranch to the CostCenters: Actual LineItems report

  • 8/9/2019 FIN2008 Prakhina Leverage Budget Management

    29/57

    Budget Upload Using Excel

    To be able to upload the files, you must specify the characteristic

    values in the lead column of the corresponding planning layout. It

    is not enough to simply specify the characteristic text.28

    You can uploadbudget values from

    Excel

    You can copy actualcosts or otherplanning profiles toyour budget

  • 8/9/2019 FIN2008 Prakhina Leverage Budget Management

    30/57

    Things to Remember

    The simplest way to define budget information is to enter

    amounts into the Cost Center Budget Planning screenfor each cost center

    All reports in SAP ERP 6.0 are embedded into Excel

    You can upload budget information by using regular flat

    files from your PC

    29

  • 8/9/2019 FIN2008 Prakhina Leverage Budget Management

    31/57

    3030

    What Wel l Cover

    Overview of Budget Management in SAP ERP 6.0

    Availabil ity Control Commitments Management (CO)

    Budget Management for Cost Centers

    Budget Management for Internal Orders Budget Management for Projects

    Web-Enabled Budgeting in SAP ERP 6.0

    Wrap-up

  • 8/9/2019 FIN2008 Prakhina Leverage Budget Management

    32/57

    Assign Budget Profi le to Internal Order

    31

    You assign BudgetProfile to Internal OrderType.

    You can allocate budgetafter the Createdstatusis reached. If you want

    to prohibit budgetallocation in the Createdstatus, you need todefine a user status.

  • 8/9/2019 FIN2008 Prakhina Leverage Budget Management

    33/57

    Change Budget for Internal Order

    32

    You can manually enter a budget per internal order orper order group

    Internal order commitments will reserve funds

    You can use Excelto upload values

    automatically

  • 8/9/2019 FIN2008 Prakhina Leverage Budget Management

    34/57

    Internal Orders Commitments Reports

    This report enables the internal orders manager tocompare budgeted and allotted costs on internal orders.

    It also includes postings on statistical internal orders.

    33

  • 8/9/2019 FIN2008 Prakhina Leverage Budget Management

    35/57

    Things to Remember

    In order to budget by internal order you have to assign a

    budget profi le to an internal order type You can manually enter budget information or upload

    using Excel

    All predefined SAP reports display budget, actual, and

    commitments values

    In order to report in a number of different currencies,

    you have to develop new reports or change existing

    reports

    34

  • 8/9/2019 FIN2008 Prakhina Leverage Budget Management

    36/57

    3535

    What Wel l Cover

    Overview of Budget Management in SAP ERP 6.0

    Availabil ity Control Commitments Management (CO)

    Budget Management for Cost Centers

    Budget Management for Internal Orders Budget Management for Projects

    Web-Enabled Budgeting in SAP ERP 6.0

    Wrap-up

    f f

  • 8/9/2019 FIN2008 Prakhina Leverage Budget Management

    37/57

    Enter Budget Information for Projects

    You can enter or use Excel upload to import budget

    amounts per project or for WBS elements

    36

    A i B d ti P fi l t th P j t D fi iti

  • 8/9/2019 FIN2008 Prakhina Leverage Budget Management

    38/57

    You should not maintainbudget profile if you

    use Budget ControlSystem (BCS)

    Assign Budgeting Profi le to the Project Definition

    37

    Tip

    You store a budgetprofile or order type inthe project definition

    The period of timeduring which budgetingis allowed

    Whether budgeting is

    allowed for total annualvalues, and/or annualvalues

    R l i th B d t

  • 8/9/2019 FIN2008 Prakhina Leverage Budget Management

    39/57

    Releasing the Budget

    You can release budget on a total or an annual level

    The release is based on the current budget, meaning theoriginal budget changed by supplements, returns, or

    transfers 38

    Release

    B d t F i C R l l ti f P j t

  • 8/9/2019 FIN2008 Prakhina Leverage Budget Management

    40/57

    Budget Foreign Currency Recalculation for Projects

    Regardless of which currency you use for budgeting,

    the system always translates the entered planning andbudget line items into the controlling area currency

    and object currency and updates the values in both

    currencies39Tip

    C i t Ch k

  • 8/9/2019 FIN2008 Prakhina Leverage Budget Management

    41/57

    Consistency Check

    40

    Consistency check of

    plan/budget Transfer of p lan to

    budget

    Mass release of

    budget for projects

    Currencyrecalculation for

    plan/budget

    The consistency checks you activated are run in the

    background when you post or pre-post a budget amount

    B d t C F d f P j t

  • 8/9/2019 FIN2008 Prakhina Leverage Budget Management

    42/57

    Budget Carry Forward for Projects

    You cannot carry

    forward a negative

    budget into thefollowing year

    41

    P j t B d t d C it t R t

  • 8/9/2019 FIN2008 Prakhina Leverage Budget Management

    43/57

    Project Budget and Commitments Reports

    Using the navigation menu, you can break down a report by a number of

    features, such as business transactions

    You can report overall budget as well as budget commitments information

    42

    Drilldown

    Thi t R b

  • 8/9/2019 FIN2008 Prakhina Leverage Budget Management

    44/57

    Things to Remember

    The budget is carried forward on the basis of the values

    in the currency defined in the budget profile To budget a project, you can transfer the values from

    cost planning as a budget; you can also enter the

    budgets directly in the WBS elements

    You can release a budget on a total or an annual level

    (providing budgeting using total or annual values is

    included in the budget profile)

    You can display totals records for supplements, returns,and transfers for projects

    43

    What Wel l Co er

  • 8/9/2019 FIN2008 Prakhina Leverage Budget Management

    45/57

    4444

    What Wel l Cover

    Overview of Budget Management in SAP ERP 6.0

    Availabil ity Control Commitments Management (CO)

    Budget Management for Cost Centers

    Budget Management for Internal Orders Budget Management for Projects

    Web-Enabled Budgeting in SAP ERP 6.0

    Wrap-up

    Web Enabled Budget Requests

  • 8/9/2019 FIN2008 Prakhina Leverage Budget Management

    46/57

    Web-Enabled Budget Requests

    45

    Request for

    Budget Request(scenario SR61)

    Budget Requestwith Approval

    (scenario SR62)

    In SAP ERP 6.0 theremultiple predefinedWeb-Enabled forms

    such as this one.Components Internet/

    Intranet ServicesInternal Service Request Scenario Definition

    Define Scenarios

    Internal Tasks

  • 8/9/2019 FIN2008 Prakhina Leverage Budget Management

    47/57

    Internal Tasks

    You can define a follow-up action for an Internal Task that wil l

    automatically be triggered and executed by the system A follow-up action can call one or more function modules that

    execute specific funct ions (for example, printing or calling up a

    transaction)

    46

    Document Flow

  • 8/9/2019 FIN2008 Prakhina Leverage Budget Management

    48/57

    Document Flow

    The document flow allows you to identify:

    Preceding documents Documents from which the current notification originated

    Subsequent documents

    Documents that originated from the current notification

    To-and-from references between documents Document number

    Addit ional data (if available)

    47

    Things to Remember

  • 8/9/2019 FIN2008 Prakhina Leverage Budget Management

    49/57

    Things to Remember

    You can define Web-enabled scenarios for recurrent

    internal service requests Budget scenarios SR61 and SR62 are predefined and

    can be used as templates

    You can assign workflow tasks and display document

    flow to list corresponding documents assigned to a

    budget request

    48

    What Wel l Cover

  • 8/9/2019 FIN2008 Prakhina Leverage Budget Management

    50/57

    49

    What We ll Cover

    Overview of Budget Management in SAP ERP 6.0

    Availabil ity Control Commitments Management (CO)

    Budget Management for Cost Centers

    Budget Management for Internal Orders Budget Management for Projects

    Web-Enabled Budgeting in SAP ERP 6.0

    Wrap-up

    Useful Reports

  • 8/9/2019 FIN2008 Prakhina Leverage Budget Management

    51/57

    Useful Reports

    Calling up Cost Element Reports for Order Commitments Choose Accounting Controlling Internal orders Information system

    Reports for internal orders Plan/Actual comparisons Additional keyfigures Order: Actual/Plan/Commitments.

    Reports for Cost Center Commitments Choose Accounting Controlling Cost Center Accounting

    Information system Reports for Cost Center Accounting Plan/Actual

    comparisons Additional key figures Cost centers: Actual/Plan/Commitments.

    Calling up Cost Element Reports for Project Commitments Choose Accounting Project System Information System

    Controlling Costs Plan-based Hierarchical Plan/Actual/

    Commitments/Rem. Plan/Assigned. To display totals records for supplements, returns and transfers

    Choose Logistics or Account ing Project System Information System Controlling Costs Budget related Budget updates

    50

    Budgeting Transactions

  • 8/9/2019 FIN2008 Prakhina Leverage Budget Management

    52/57

    Budgeting Transactions

    KPZ2 Cost Center Budgets Change

    KO22 Internal Order Budget Change

    CJ30 Project Budget Change CJCO Project Budget Carry Forward

    CJCF Project Carry Forward Commitment

    CJCO Project Budget Carry Forward

    IMCCP3 Transfer Plan to Project Budget

    IMCOC3 Plan/Budget Consistency Check for Projects

    KO30 Activate Availability Control

    KOCO Internal Order Budget Carry Forward

    KOCF Internal Order Commitment Carry Forward

    IMCCP4 Transfer Plan to Order Budget KSCF Cost Center Commitment Carry Forward

    KP06 Change Cost Center Budget Cost, Activity Inputs, and Cost Elements

    IMCOC4 Plan/Budget Consistency Check for Orders

    51

    Budgeting Menu Paths

  • 8/9/2019 FIN2008 Prakhina Leverage Budget Management

    53/57

    Budgeting Menu Paths

    To define Budget Profile for Cost Centers in

    Customizing, choose: Controlling Budget Management Budget Management

    Define Budget Planning Profi les

    To define Budget Profile for Internal Orders inCustomizing, choose: Controlling Internal Orders Budgeting and Availability

    Control Maintain Budget Profile

    To define Budget Profile for Projects in Customizing,choose: Project System Costs Budget Maintain Budget

    Profiles

    52

    Budgeting Menu Paths (cont )

  • 8/9/2019 FIN2008 Prakhina Leverage Budget Management

    54/57

    Budgeting Menu Paths (cont.)

    Another ways to assign a budget profile to a project:

    As a default in Customizing under Project System Costs Budget Maintain Budget Profile

    In the profi le data of a standard project definition under

    Accounting Project System Project Special

    Maintenance Functions Project Structure Planning Project Definition Create Control tab page Group box

    Accounting Budget Profile

    In the profi le data of a project definition in Customizing under

    Project System Structures Operative Structures

    Project Structure Plan Create Project Profile

    Resources

  • 8/9/2019 FIN2008 Prakhina Leverage Budget Management

    55/57

    5454

    Resources

    SAP Service Marketplace*

    Cost Center and Internal Order Accounting http://service.sap.com/~form/sapnet?_SHORTKEY=01200252

    310000079805&

    SAP Help Portal

    http://help.sap.com/erp2005_ehp_03/helpdata/EN/a9/ab7f68414111d182b10000e829fbfe/frameset.htm

    SAP Developers Network

    www.sdn.sap.com/irj/sdn/bpx-forums

    * Requires login credentials to the SAP Service Marketplace

    7 Key Points to Take Home

  • 8/9/2019 FIN2008 Prakhina Leverage Budget Management

    56/57

    5555

    7 Key Points to Take Home

    You can budget by cost center, internal order, and

    project The main configuration feature is to create and assign a

    budget profile

    All reports are Excel-enabled

    You can upload budget information into SAP from Excel You can display, enter, and request budget information

    over the internet/intranet

    You can monitor your budget spending with

    Commitments Management

    Availabil ity Control feature prevents you from spendingunapproved funds

    Your Turn!

  • 8/9/2019 FIN2008 Prakhina Leverage Budget Management

    57/57

    Your Turn!

    How to contact me:

    Michael Prakhina

    [email protected]