FIIF Management Board Technology Transfer Status May 2012 A . Kellner, May23rd, 2012. Technology Transfer Phases. The long time-to-maturity of the development of the fusion power plant technologies and the related engineering know-how leads to 2 transfer phases. Phase 1: - PowerPoint PPT Presentation

Citation preview

Page 1: FIIF Management Board Technology Transfer Status May 2012

FIIF Management BoardTechnology Transfer

Status May 2012

A. Kellner, May23rd, 2012

Page 2: FIIF Management Board Technology Transfer Status May 2012

Page 2

Thi

s do

cum

ent i

s th

e pr

oper

ty o

f Ast

rium

. It s

hall

not b

e co

mm

unic

ated

to th

ird p

artie

s w

ithou

t prio

r w

ritte

n ag

reem

ent.

Its c

onte

nt s

hall

not b

e di

sclo

sed.

ASTRIUM ST CTO/CQO

Technology Transfer Phases

The long time-to-maturity of the development of the fusion power planttechnologies and the related engineering know-how leads to 2 transfer phases

Phase 1: • transfer of technologies for spin-off generation in non-fusion applications• to startups and SMEs

Phase 2: • transfer of technologies and engineering, integration and ops know-how to build power plants• to potential power plant builders

Page 3: FIIF Management Board Technology Transfer Status May 2012

Page 3

Thi

s do

cum

ent i

s th

e pr

oper

ty o

f Ast

rium

. It s

hall

not b

e co

mm

unic

ated

to th

ird p

artie

s w

ithou

t prio

r w

ritte

n ag

reem

ent.

Its c

onte

nt s

hall

not b

e di

sclo

sed.

ASTRIUM ST CTO/CQO

Phase 1: Transfer Organisation and Processes

Set up a

Technology Transfer Programme Office (TTPO) coordinating:

a Technology Transfer Network (TTN) of technology brokers which get EU

contracts (basic reimbursement and incentives) to pro-actively foster the

knowledge dissemination

opportunities announced on a web-based Technology Market Place matching

technology push and business pull

Business Incubation Centers helping start-ups technologically and legally

funding support for start-ups, e.g. outsourced to Venture Capital companies

Page 4: FIIF Management Board Technology Transfer Status May 2012

Page 4

Thi

s do

cum

ent i

s th

e pr

oper

ty o

f Ast

rium

. It s

hall

not b

e co

mm

unic

ated

to th

ird p

artie

s w

ithou

t prio

r w

ritte

n ag

reem

ent.

Its c

onte

nt s

hall

not b

e di

sclo

sed.

ASTRIUM ST CTO/CQO

Phase 2: Transfer Organisation and Processes

Extend the

Technology Transfer Programme Office (TTPO) to coordinate:

the short-term establishment of a knowledge management system to capture the

knowledge (*)acquired during the JET and ITER construction in configuration-managed,

structured formats easily retrievable in later times

in the long run the placement of a contract to a consortium of potential power plant builders

with the relevant associations as subcontractors for the pre-competitive transfer of know-

how on technologies, engineering, integration, and operations

(*) Comprising, apart from explicitly documented knowledge, in particular the implicit knowledge in the minds of staff w.r.t. best practices, lessons learned on mishaps, experience gained in manufacturing, integration and operations, etc.

Page 5: FIIF Management Board Technology Transfer Status May 2012

Page 5

Thi

s do

cum

ent i

s th

e pr

oper

ty o

f Ast

rium

. It s

hall

not b

e co

mm

unic

ated

to th

ird p

artie

s w

ithou

t prio

r w

ritte

n ag

reem

ent.

Its c

onte

nt s

hall

not b

e di

sclo

sed.

ASTRIUM ST CTO/CQO

Current Status

Phase 1: 2-years pilot project piggy-back „on top“ of the ESA process and institutions Basic agreement with ESA reached Currently under EC-internal preparation

Phase 2: Pilot of a Lessons Learned System currently under development in F4E contract

and procurement unit Focused on knowledge sharing w.r.t. handling procurement procedures