C-11 Figure C-17. ARA-02 Standard Army Maintenance System (SAMS) survey. Figure C-18. ARA-02 SAMS survey.

Figure C-17. ARA-02 Standard Army Maintenance System (SAMS ... · ARA-02 Standard Army Maintenance System (SAMS) ... ARA-02 SAMS survey. C-12 Figure C-19. ... ARA-07 seepage pit backfill

Embed Size (px)

Citation preview

C-11

Figure C-17. ARA-02 Standard Army Maintenance System (SAMS) survey.

Figure C-18. ARA-02 SAMS survey.

C-12

Figure C-19. ARA-07 aboveground structure.

Figure C-20. ARA-07 aboveground structure removal.

C-13

Figure C-21. ARA-07 seepage pit.

Figure C-22. ARA-07 seepage pit block removal.

C-14

Figure C-23. ARA-07 seepage pit backfill.

Figure C-24. ARA-08 excavation.