2
Strathy South Wind Farm Figure 4.15a - VP8: Sgor Chaonasaid Baseline Photo and Cumulative Wireline Horizontal field of view: 90° (cylindrical projection) Principal distance: 522 mm OS reference: 257961 E 949822 N Direction of view: 85.82° Nearest visible turbine: 19.4 km Ground level: 699.46 m AOD Camera: Canon EOS 5D Mk II Date and time: 23/07/2019 11:19 Camera height: 1.5m AGL Lens: 50mm (Canon EF 50mm f/1.4) Cumulative Wireline Drawing Baseline Photograph This image provides landscape and visual context only Drawing No. - 119008-D-LV4.15a-1.0.0 Date - 20/06/2020 Proposed Varied Development Wind Turbine Consented Wind Turbine Application / Appeal Wind Turbine Scoping Wind Turbine Operational / Under Construction Wind Turbine Proposed Varied Development Strathy Wood Wind Farm Strathy North Wind Farm Limekiln Wind Farm Baillie Wind Farm Ackron Wind Farm Armadale Wind Farm Bettyhill Wind Farm Extent of 53.5° planar panorama Extent of central 50mm frame used to construct panorama

Figure 4.15a - VP8: Sgor Chaonasaid Baseline Photo and ......Figure 4.15b - VP8: Sgor Chaonasaid Wireline Ground level: 699.46 m AOD Nearest visible turbine: 19.4 km OS reference:

  • Upload
    others

  • View
    3

  • Download
    0

Embed Size (px)

Citation preview

  • Strathy South Wind Farm

    Figure 4.15a - VP8: Sgor Chaonasaid Baseline Photo and Cumulative Wireline

    Horizontal field of view: 90° (cylindrical projection)Principal distance: 522 mm

    OS reference: 257961 E 949822 N

    Direction of view: 85.82°Nearest visible turbine: 19.4 km

    Ground level: 699.46 m AODCamera: Canon EOS 5D Mk II

    Date and time: 23/07/2019 11:19Camera height: 1.5m AGLLens: 50mm (Canon EF 50mm f/1.4)

    Cumulative Wireline Drawing

    Baseline Photograph This image provides landscape and visual context only

    Drawing No. - 119008-D-LV4.15a-1.0.0 Date - 20/06/2020

    Proposed Varied Development Wind Turbine

    Consented Wind Turbine

    Application / AppealWind Turbine

    Scoping Wind Turbine

    Operational / UnderConstruction Wind Turbine

    Proposed Varied DevelopmentStrathy Wood Wind Farm

    Strathy North Wind Farm

    Limekiln Wind Farm

    Baillie Wind Farm

    Ackron Wind Farm

    Armadale Wind Farm

    Bettyhill Wind Farm

    Extent of 53.5° planar panorama

    Extent of central 50mm frame used to construct panorama

  • Drawing: 117037-D-SCOFI2-0.0.2

    Strathy South Wind Farm

    Figure 4.15b - VP8: Sgor Chaonasaid Wireline

    Ground level: 699.46 m AOD

    Nearest visible turbine: 19.4 km

    OS reference: 257961 E 949822 N

    Direction of view: 85.82° Paper size: 841 x 297 mm (half A1) Correct printed image size: 820 x 260 mm

    Horizontal field of view: 53.5° (planar projection)Principal distance: 812.5 mm

    Wireline Drawing View flat at a comfortable arm’s length

    Drawing No. - 119008-D-LV4.15b-1.0.0 Date - 20/06/2020

    46 45 19 18 20 29 419 11 49 47 13 15 1756 6 52 8 57 10 5069 72 70 1 2 4 61 39 43 26 35 36 33 2842 22 24 30

    Proposed Varied Development Wind Turbine

    Strathy North Wind Farm Turbine

    StrathySouth_Figure 4.15a_Low_res1: Page 1

    StrathySouth_Figure 4.15b_Low_res1: Comp Wirelines