Upload
others
View
3
Download
0
Embed Size (px)
Citation preview
Strathy South Wind Farm
Figure 4.15a - VP8: Sgor Chaonasaid Baseline Photo and Cumulative Wireline
Horizontal field of view: 90° (cylindrical projection)Principal distance: 522 mm
OS reference: 257961 E 949822 N
Direction of view: 85.82°Nearest visible turbine: 19.4 km
Ground level: 699.46 m AODCamera: Canon EOS 5D Mk II
Date and time: 23/07/2019 11:19Camera height: 1.5m AGLLens: 50mm (Canon EF 50mm f/1.4)
Cumulative Wireline Drawing
Baseline Photograph This image provides landscape and visual context only
Drawing No. - 119008-D-LV4.15a-1.0.0 Date - 20/06/2020
Proposed Varied Development Wind Turbine
Consented Wind Turbine
Application / AppealWind Turbine
Scoping Wind Turbine
Operational / UnderConstruction Wind Turbine
Proposed Varied DevelopmentStrathy Wood Wind Farm
Strathy North Wind Farm
Limekiln Wind Farm
Baillie Wind Farm
Ackron Wind Farm
Armadale Wind Farm
Bettyhill Wind Farm
Extent of 53.5° planar panorama
Extent of central 50mm frame used to construct panorama
Drawing: 117037-D-SCOFI2-0.0.2
Strathy South Wind Farm
Figure 4.15b - VP8: Sgor Chaonasaid Wireline
Ground level: 699.46 m AOD
Nearest visible turbine: 19.4 km
OS reference: 257961 E 949822 N
Direction of view: 85.82° Paper size: 841 x 297 mm (half A1) Correct printed image size: 820 x 260 mm
Horizontal field of view: 53.5° (planar projection)Principal distance: 812.5 mm
Wireline Drawing View flat at a comfortable arm’s length
Drawing No. - 119008-D-LV4.15b-1.0.0 Date - 20/06/2020
46 45 19 18 20 29 419 11 49 47 13 15 1756 6 52 8 57 10 5069 72 70 1 2 4 61 39 43 26 35 36 33 2842 22 24 30
Proposed Varied Development Wind Turbine
Strathy North Wind Farm Turbine
StrathySouth_Figure 4.15a_Low_res1: Page 1
StrathySouth_Figure 4.15b_Low_res1: Comp Wirelines