Upload
jon-berkoe
View
71
Download
0
Embed Size (px)
Citation preview
© 2015, Fiatech
4D Planning as a Means
for Balancing
Technology and
Disruption
Compelling
Image Here
(If Possible)
Jon Berkoe [email protected]
Benjamin Crosby [email protected]
© 2015, Fiatech
Integrated 4D – Where We Need To BE
Ap
pro
ach
& B
en
efi
ts R
ea
lize
d
© 2015, FiatechPre
sen
tati
on
Ta
kea
wa
ys/D
eli
vera
ble
s
IS THERE A GAP THAT NEEDS TO BE BRIDGED?
IS THERE A STRATEGY TO MINIMIZE THE REAL AND PERCEIVED
RISK TO PROJECT WORKFLOW DISRUPTION?
© 2015, FiatechPre
sen
tati
on
Ta
kea
wa
ys/D
eli
vera
ble
s
“NOT ON MY JOB”
• BIM/PIM technology promises “end to
end” IT-driven execution and delivery
• The “enablers” are working hard to drive
change
• Many “stakeholders” are cautious –
“NOT ON MY JOB”
© 2015, Fiatech
WHAT KEEPS YOU UP AT NIGHT?
PM’s and CM’s expectations
are defined by their needs….
What do they need?Ability to see what is coming,
Ability to avoid rework,
Ability to deal with the constantly
changing dynamics
Co
nst
rain
ts &
Ba
rrie
rs
© 2015, Fiatech
4D PLANNING – WHAT IT MEANS
• Foundational process that utilizes software which integrates schedule data
with model data
• Single environment provides for creation of visually detailed construction
sequences that can be modified, analyzed, and optimized
• Leads to alignment of planned and actualized activities through the full
lifecycle of the project execution.
Ap
pro
ach
& B
en
efi
ts R
ea
lize
d
© 2015, Fiatech
GOALS FOR SUCCESS
Ap
pro
ach
& B
en
efi
ts R
ea
lize
d
4D “VISUALIZATION”
4D must
become
the project
“mindset”
© 2015, Fiatech
Ap
pro
ach
& B
en
efi
ts R
ea
lize
d
BIM PROCESS – FROM TECH TO REALITY
How Does 4D
Planning
Minimize
Disruption And
Become The
Project Mindset?
Achieving Success!
© 2015, Fiatech
Op
po
rtu
nit
ies
Be
ing
Ad
dre
sse
d
Align BIM LOD to Schedule Development
© 2015, Fiatech
Op
po
rtu
nit
ies
Be
ing
Ad
dre
sse
d
Align BIM LOD to Schedule Development
BIM
LOD
LOD 100-
200
LOD 100-
300
LOD 200-
300
LOD 300-
400
LOD
500
AACEi
Sched Level 1 Level 2 Level 3 Level 4 Level 5
Design
Stages
Program
Devel. /
Schematic
Design
Develop.
Construction
Docs. Fabrication Installation
© 2015, Fiatech
Co
nst
rain
ts &
Ba
rrie
rs
BIM Process with LOD
• Schematic
• Design Devel.
• Construct Docs
• Fabrication
• Installation
© 2015, Fiatech
Co
nst
rain
ts &
Ba
rrie
rs
BIM Process with LOD
• Schematic
• Design Devel.
• Construct Docs
• Fabrication
• Installation
4D4D4D4D4D
© 2015, Fiatech
Co
nst
rain
ts &
Ba
rrie
rs
BIM Process with LOD
• Schematic Design
4D4D
© 2015, Fiatech
Schematic – Level 1 and LOD 100
Compelling
Image Here
Ap
pro
ach
& B
en
efi
ts R
ea
lize
d
© 2015, Fiatech
Co
nst
rain
ts &
Ba
rrie
rs
BIM Process with LOD
• Marketing
4D
© 2015, Fiatech
Marketing – Level 1 and LOD 100
Ap
pro
ach
& B
en
efi
ts R
ea
lize
d
© 2015, Fiatech
Co
nst
rain
ts &
Ba
rrie
rs
BIM Process with LOD
• Construction
Documentation
4D4D
© 2015, Fiatech
Design – Level 2 and LOD 200-300
Ap
pro
ach
& B
en
efi
ts R
ea
lize
d
© 2015, Fiatech
Co
nst
rain
ts &
Ba
rrie
rs
BIM Process with LOD
• Fabrication
4D4D
© 2015, Fiatech
Fabrication – Level 4 and LOD 300-400
Ap
pro
ach
& B
en
efi
ts R
ea
lize
d
© 2015, Fiatech
Co
nst
rain
ts &
Ba
rrie
rs
BIM Process with LOD
• Installation
4D4D4D4D4D
© 2015, Fiatech
Thank You… Are There Any Questions?
Co
nta
ct &
Mo
re I
nfo
rma
tio
n
Benjamin
Crosby
Jon
Berkoe