© 2015, Fiatech 4D Planning as a Means for Balancing Technology and Disruption Compelling Image Here (If Possible) Jon Berkoe [email protected] Benjamin Crosby [email protected]

Fiatech Presentation Berkoe_Crosby_Final

Embed Size (px)

Citation preview

Page 1: Fiatech Presentation Berkoe_Crosby_Final

© 2015, Fiatech

4D Planning as a Means

for Balancing

Technology and

Disruption

Compelling

Image Here

(If Possible)

Jon Berkoe [email protected]

Benjamin Crosby [email protected]

Page 2: Fiatech Presentation Berkoe_Crosby_Final

© 2015, Fiatech

Integrated 4D – Where We Need To BE

Ap

pro

ach

& B

en

efi

ts R

ea

lize

d

Page 3: Fiatech Presentation Berkoe_Crosby_Final

© 2015, FiatechPre

sen

tati

on

Ta

kea

wa

ys/D

eli

vera

ble

s

IS THERE A GAP THAT NEEDS TO BE BRIDGED?

IS THERE A STRATEGY TO MINIMIZE THE REAL AND PERCEIVED

RISK TO PROJECT WORKFLOW DISRUPTION?

Page 4: Fiatech Presentation Berkoe_Crosby_Final

© 2015, FiatechPre

sen

tati

on

Ta

kea

wa

ys/D

eli

vera

ble

s

“NOT ON MY JOB”

• BIM/PIM technology promises “end to

end” IT-driven execution and delivery

• The “enablers” are working hard to drive

change

• Many “stakeholders” are cautious –

“NOT ON MY JOB”

Page 5: Fiatech Presentation Berkoe_Crosby_Final

© 2015, Fiatech

WHAT KEEPS YOU UP AT NIGHT?

PM’s and CM’s expectations

are defined by their needs….

What do they need?Ability to see what is coming,

Ability to avoid rework,

Ability to deal with the constantly

changing dynamics

Co

nst

rain

ts &

Ba

rrie

rs

Page 6: Fiatech Presentation Berkoe_Crosby_Final

© 2015, Fiatech

4D PLANNING – WHAT IT MEANS

• Foundational process that utilizes software which integrates schedule data

with model data

• Single environment provides for creation of visually detailed construction

sequences that can be modified, analyzed, and optimized

• Leads to alignment of planned and actualized activities through the full

lifecycle of the project execution.

Ap

pro

ach

& B

en

efi

ts R

ea

lize

d

Page 7: Fiatech Presentation Berkoe_Crosby_Final

© 2015, Fiatech

GOALS FOR SUCCESS

Ap

pro

ach

& B

en

efi

ts R

ea

lize

d

4D “VISUALIZATION”

4D must

become

the project

“mindset”

Page 8: Fiatech Presentation Berkoe_Crosby_Final

© 2015, Fiatech

Ap

pro

ach

& B

en

efi

ts R

ea

lize

d

BIM PROCESS – FROM TECH TO REALITY

How Does 4D

Planning

Minimize

Disruption And

Become The

Project Mindset?

Achieving Success!

Page 9: Fiatech Presentation Berkoe_Crosby_Final

© 2015, Fiatech

Op

po

rtu

nit

ies

Be

ing

Ad

dre

sse

d

Align BIM LOD to Schedule Development

Page 10: Fiatech Presentation Berkoe_Crosby_Final

© 2015, Fiatech

Op

po

rtu

nit

ies

Be

ing

Ad

dre

sse

d

Align BIM LOD to Schedule Development

BIM

LOD

LOD 100-

200

LOD 100-

300

LOD 200-

300

LOD 300-

400

LOD

500

AACEi

Sched Level 1 Level 2 Level 3 Level 4 Level 5

Design

Stages

Program

Devel. /

Schematic

Design

Develop.

Construction

Docs. Fabrication Installation

Page 11: Fiatech Presentation Berkoe_Crosby_Final

© 2015, Fiatech

Co

nst

rain

ts &

Ba

rrie

rs

BIM Process with LOD

• Schematic

• Design Devel.

• Construct Docs

• Fabrication

• Installation

Page 12: Fiatech Presentation Berkoe_Crosby_Final

© 2015, Fiatech

Co

nst

rain

ts &

Ba

rrie

rs

BIM Process with LOD

• Schematic

• Design Devel.

• Construct Docs

• Fabrication

• Installation

4D4D4D4D4D

Page 13: Fiatech Presentation Berkoe_Crosby_Final

© 2015, Fiatech

Co

nst

rain

ts &

Ba

rrie

rs

BIM Process with LOD

• Schematic Design

4D4D

Page 14: Fiatech Presentation Berkoe_Crosby_Final

© 2015, Fiatech

Schematic – Level 1 and LOD 100

Compelling

Image Here

Ap

pro

ach

& B

en

efi

ts R

ea

lize

d

Page 15: Fiatech Presentation Berkoe_Crosby_Final

© 2015, Fiatech

Co

nst

rain

ts &

Ba

rrie

rs

BIM Process with LOD

• Marketing

4D

Page 16: Fiatech Presentation Berkoe_Crosby_Final

© 2015, Fiatech

Marketing – Level 1 and LOD 100

Ap

pro

ach

& B

en

efi

ts R

ea

lize

d

Page 17: Fiatech Presentation Berkoe_Crosby_Final

© 2015, Fiatech

Co

nst

rain

ts &

Ba

rrie

rs

BIM Process with LOD

• Construction

Documentation

4D4D

Page 18: Fiatech Presentation Berkoe_Crosby_Final

© 2015, Fiatech

Design – Level 2 and LOD 200-300

Ap

pro

ach

& B

en

efi

ts R

ea

lize

d

Page 19: Fiatech Presentation Berkoe_Crosby_Final

© 2015, Fiatech

Co

nst

rain

ts &

Ba

rrie

rs

BIM Process with LOD

• Fabrication

4D4D

Page 20: Fiatech Presentation Berkoe_Crosby_Final

© 2015, Fiatech

Fabrication – Level 4 and LOD 300-400

Ap

pro

ach

& B

en

efi

ts R

ea

lize

d

Page 21: Fiatech Presentation Berkoe_Crosby_Final

© 2015, Fiatech

Co

nst

rain

ts &

Ba

rrie

rs

BIM Process with LOD

• Installation

4D4D4D4D4D

Page 22: Fiatech Presentation Berkoe_Crosby_Final

© 2015, Fiatech

Thank You… Are There Any Questions?

Co

nta

ct &

Mo

re I

nfo

rma

tio

n

Benjamin

Crosby

Jon

Berkoe