www.tetratech.com
FEMA Levee Certification
Maxent Levee
40 Arpent Levee
Presented by:
Patti Sexton
November 21, 2013
What is FEMA Levee Certification
FEMA MAPFEMA MAP AERIAL IMAGEAERIAL IMAGE
WARNING:
Provisionally
Accredited
Levee.
(FEMA Note)
ZONE X
What is FEMA Levee Certification
•
What are the requirements
• Design Criteria– Freeboard
– Closures
– Embankment Protection
– Stability/Seepage
– Settlement
– Interior Drainage
• Operations Plan
• Maintenance Plan
• As-built plans
• Engineer certification
What are the requirements
• Operations & Maintenance Plan– Must be levee specific
– Operation • Closure structures
• Interior Drainage (pipes, pumps)
• Flood warning – document warning time
– Maintenance Activities• Activities performed
• Frequency
• Name/title responsible
• Type of vegetation allowed
– Inspection• Levee
• Mechanical systems
– Jurisdiction (O&M)• Agency created by Federal/State Law
• Officially adopted
PAL AgreementMaxent and Paris Road,
and 40 Arpent and Florida Ave Levee Systems
AUGUST 7, 2014
• Phase 1
– Data Collection and Review
– Inspections
– Needs Assessment Report
– Meetings
Work Completed
Inspection Report
Main Findings
• Maintenance issues
• Sheetpile corrosion
Meetings
• Existing interior drainage documentation sufficient
• Some flexibility in schedule
USACE
• Agree HSDRRS is not required
• Using USACE EM 1110-2-1913
Work to Complete
FIELD WORK
• Subsurface Investigations*
• Sheetpile Testing
• Surveys*
ANALYSESANALYSES
• Geotechnical
• Structural
DOCUMENT
• Develop As-Builts
• Update O&M Plans
• Certification Report
* Work underway
Schedule
x
•
y
•
x
•