Upload
others
View
4
Download
0
Embed Size (px)
Citation preview
PHASE 1PHASE 1PHASE 1PHASE 2
PHASE 2PHASE 2
Proposed Construction Right of Wayfor Tacoma Water 2nd Supply Pipeline
Proposed Construction Right of Wayfor Tacoma Water 2nd Supply Pipeline
Tacoma Water SupplyPipeline No. 5 Right of Way
Tacoma Water Supply Pipeline No. 5 Right of Way
BPARight of WayBPARight of Way
Brannan ParkBrannan Park
Brannan ParkStormwater
Pump Station
Brannan ParkStormwater
Pump Station
30th Street NE30th Street NE
26th Street NE26th Street NE
37th Street NE37th Street NE
AuburnMunicipal
Airport
AuburnMunicipal
Airport
Isaac EvansPark
Isaac EvansPark
Auburn RegionalGolf Course
Auburn RegionalGolf Course
Auburn 40 DevelopmentAuburn 40 Development
Labr
ador
Prop
erty
Labr
ador
Prop
erty
River Mobile EstatesRiver Mobile Estates
City of Auburn Property(former Crista Property)City of Auburn Property(former Crista Property)
Riverpointe DevelopmentRiverpointe Development
Riverpark Estates DevelopmentRiverpark Estates Development
Trail Run DevelopmentTrail Run Development
Port of SeattleWetland Mitigation
Site
Port of SeattleWetland Mitigation
Site
Gre
enRi
ver R
oad
SE
Gre
en R
iver R
oad
SE
Gre
enR
iver
Roa
dS
EG
reen
Riv
er R
oad
SE
RM 29.5RM 29.5RM 29.5RM 29.5
RM 28.5RM 28.5RM 28.5RM 28.5
RM 28.0RM 28.0RM 28.0RM 28.0
RM 27.5RM 27.5RM 27.5RM 27.5
RM 29.0RM 29.0RM 29.0RM 29.0
Green R
iverG
reenR
iverG
reenR
iverG
reen River
Green River
Green River
Green River
Green River
Green River
Green River
Green River
Green River
MS
treet
NE
M S
treet
NE
CS
treet
NE
C S
treet
NE
Aub
run
Way
N.
Aub
run
Way
N.
AubrunW
ay N.
Aubrun Way N.
EXISTINGLEVEE
PROPOSEDLEVEE
ALIGNMENTPROPOSED LEVEE
LeveeFootprint
Levee Crest
500’500’ 0
Legend
Minor Contours - 2 foot
River Mile Marker and Number
Parcel Boundaries
Utility Easements
Railroad
Major Contours - 10 foot
5.1MR
Edge of Pavement
Structures
Edge of Water
MaintenanceAccess Road
135-12539-10001-06/Fig3-1_FINA
L_BaseM
apandProposedA
lignment.ai
Reddington Levee Setback and Extension Feasibility Report1420 Fifth Avenue, Suite 600Seattle, Washington 98101Tel 206.883.9300 Fax 206.883-9301
Figure 3-1.UPDATED BASE MAP AND PROPOSED LEVEE ALIGNMENT