23
February 12 th , 2004 Heidelberg TPC Meeting J.B. TPC SECTOR TEST TPC SECTOR TEST at T10 at T10 May 3 May 3 rd rd – June 2 – June 2 nd nd MOTIVATION REQUIREMENTS STATUS OF SYSTEM TIME SCHEDULE CONCLUSIONS

February 12 th, 2004 Heidelberg TPC Meeting J.B. TPC SECTOR TEST at T10 May 3 rd – June 2 nd MOTIVATION REQUIREMENTS STATUS OF SYSTEM TIME SCHEDULE CONCLUSIONS

Embed Size (px)

Citation preview

Page 1: February 12 th, 2004 Heidelberg TPC Meeting J.B. TPC SECTOR TEST at T10 May 3 rd – June 2 nd MOTIVATION REQUIREMENTS STATUS OF SYSTEM TIME SCHEDULE CONCLUSIONS

February 12th , 2004Heidelberg TPC Meeting J.B.

TPC SECTOR TEST TPC SECTOR TEST at T10 at T10

May 3May 3rdrd – June 2 – June 2ndnd

MOTIVATION

REQUIREMENTS

STATUS OF SYSTEM

TIME SCHEDULE

CONCLUSIONS

Page 2: February 12 th, 2004 Heidelberg TPC Meeting J.B. TPC SECTOR TEST at T10 May 3 rd – June 2 nd MOTIVATION REQUIREMENTS STATUS OF SYSTEM TIME SCHEDULE CONCLUSIONS

February 12th , 2004Heidelberg TPC Meeting J.B.

MOTIVATION 1MOTIVATION 1 CALIBRATION OF TPC (IROC MODULE) -- DEFINED BEAM ENERGY

--- electronics gain (x) chamber gain --- dE/dX studies

TRACKING WITH EXTERNAL REFERENCE

DEFINED PARTICLE ANGLE

Page 3: February 12 th, 2004 Heidelberg TPC Meeting J.B. TPC SECTOR TEST at T10 May 3 rd – June 2 nd MOTIVATION REQUIREMENTS STATUS OF SYSTEM TIME SCHEDULE CONCLUSIONS

February 12th , 2004Heidelberg TPC Meeting J.B.

MOTIVATION 2MOTIVATION 2

FULL OPERATION OF COMPLETE INNER SECTOR

-- ALL FE CARDS (final cards) -- RCU CARD (full functionality) -- ISEG (HV)

-- WIENER (LV) -- FINAL GATING GRID PULSER

Page 4: February 12 th, 2004 Heidelberg TPC Meeting J.B. TPC SECTOR TEST at T10 May 3 rd – June 2 nd MOTIVATION REQUIREMENTS STATUS OF SYSTEM TIME SCHEDULE CONCLUSIONS

February 12th , 2004Heidelberg TPC Meeting J.B.

REQUIREMENTS REQUIREMENTS (BEAM/PARTICLES/GEOMETRY)(BEAM/PARTICLES/GEOMETRY)BEAM ENERGY VARIATIONBEAM INTENSITY VARIATIONPARTICLE SEPARATIONTRACK ANGLE VARIATONEXTERNAL TRACKINGTRIGGER

Page 5: February 12 th, 2004 Heidelberg TPC Meeting J.B. TPC SECTOR TEST at T10 May 3 rd – June 2 nd MOTIVATION REQUIREMENTS STATUS OF SYSTEM TIME SCHEDULE CONCLUSIONS

February 12th , 2004Heidelberg TPC Meeting J.B.

REQUIREMENTSREQUIREMENTS(ELECTRONICS/RCU)(ELECTRONICS/RCU)

ALL FE ELECTRONIC CHANNELS 43 FE Cards

RCU CARD -> 2 RCU cards with full functionality

TRIGGER LOGIC -> NIM TO LVCMOS

Page 6: February 12 th, 2004 Heidelberg TPC Meeting J.B. TPC SECTOR TEST at T10 May 3 rd – June 2 nd MOTIVATION REQUIREMENTS STATUS OF SYSTEM TIME SCHEDULE CONCLUSIONS

February 12th , 2004Heidelberg TPC Meeting J.B.

REQUIREMENTS REQUIREMENTS (DAQ/DDL)(DAQ/DDL) VISUALIZATION

-> ONLINE MONITOR

COMBINATION OF THE MICROSTRIP-T AND TPC-DAQ -> EVENT BY EVENT MATCHING :

TPC<->MICROSTRIP DDL

-> 2 DDL + DATE -> Download

-- MAX DATA FLOW/EVENT (WITHOUT 0-SUP.) 3.1 Mbyte/event -> (1.9 Mbyte/event / 1.2 Mbyte/event)

max speed : 200 Mbytes/sec 100 events/sec

CONNECTION TO CASTOR

Page 7: February 12 th, 2004 Heidelberg TPC Meeting J.B. TPC SECTOR TEST at T10 May 3 rd – June 2 nd MOTIVATION REQUIREMENTS STATUS OF SYSTEM TIME SCHEDULE CONCLUSIONS

February 12th , 2004Heidelberg TPC Meeting J.B.

REQUIREMENTS REQUIREMENTS (DATA BASE/STORAGE)(DATA BASE/STORAGE) 136 RUNS

# 40 ANODE VOLTAGE – DRIFT # 48 (r-phi/z) - Drift # 48 BEAM ENERGY – DRIFT

5000 EVENTS PER RUN 680 k EVENTS TOTAL ~ 2 Tbyte

Page 8: February 12 th, 2004 Heidelberg TPC Meeting J.B. TPC SECTOR TEST at T10 May 3 rd – June 2 nd MOTIVATION REQUIREMENTS STATUS OF SYSTEM TIME SCHEDULE CONCLUSIONS

February 12th , 2004Heidelberg TPC Meeting J.B.

REQUIREMENTS REQUIREMENTS (DCS)(DCS)DCS (NOT WITH ECS)

-- OPERATION OF ISEG/WIENER

-- VOLTAGE/CURRENT/ /TEMP/PRESSURE MONITORING AND ARCHIVING

Page 9: February 12 th, 2004 Heidelberg TPC Meeting J.B. TPC SECTOR TEST at T10 May 3 rd – June 2 nd MOTIVATION REQUIREMENTS STATUS OF SYSTEM TIME SCHEDULE CONCLUSIONS

February 12th , 2004Heidelberg TPC Meeting J.B.

REQUIREMENTSREQUIREMENTS(READOUT/FIELD CAGE/GAS)(READOUT/FIELD CAGE/GAS)

WORKING READOUT CHAMBER AT NOMINAL VOLTAGE (Ne/CO2/N2) (85.7/9.5/4.8)

DRIFT FIELD OF 400 V/cmOXYGEN < 10 ppmSTABLE GAS MIX

(NE/CO2/N2) (85.7/9.5/4.8)TEMP / PRESSURE

Page 10: February 12 th, 2004 Heidelberg TPC Meeting J.B. TPC SECTOR TEST at T10 May 3 rd – June 2 nd MOTIVATION REQUIREMENTS STATUS OF SYSTEM TIME SCHEDULE CONCLUSIONS

February 12th , 2004Heidelberg TPC Meeting J.B.

REQUIREMENTSREQUIREMENTS

(T10 BEAM LINE)(T10 BEAM LINE) MECHANIC SUPPORT (phi-angle and z-angle variation)MICROSTRIP TELESCOPETRIGGER SYSTEM (SCINT.C)

Page 11: February 12 th, 2004 Heidelberg TPC Meeting J.B. TPC SECTOR TEST at T10 May 3 rd – June 2 nd MOTIVATION REQUIREMENTS STATUS OF SYSTEM TIME SCHEDULE CONCLUSIONS

February 12th , 2004Heidelberg TPC Meeting J.B.

REQUIREMENT REQUIREMENT (MANPOWER/TEAMS)(MANPOWER/TEAMS)CHAMBER/FIELD-CAGE/GAS/

MICROSTRIP/BEAM /SURV.

FE-ELECTRONICSDCSRCU DAQ-DDL SOFTWARE

Page 12: February 12 th, 2004 Heidelberg TPC Meeting J.B. TPC SECTOR TEST at T10 May 3 rd – June 2 nd MOTIVATION REQUIREMENTS STATUS OF SYSTEM TIME SCHEDULE CONCLUSIONS

February 12th , 2004Heidelberg TPC Meeting J.B.

STATUS STATUS (READOUT/FIELD CAGE/ GAS SYSTEM)(READOUT/FIELD CAGE/ GAS SYSTEM)

READOUT-- operational

FIELD CAGE -- He-Leak detection leak drift/CO2 volume-- Field optimization in progress (40 k events)

GAS SYSTEM -- He Leak detection improvement

-- pump circuit changed permanent circulation -- pump service kit ordered /spare pump

Page 13: February 12 th, 2004 Heidelberg TPC Meeting J.B. TPC SECTOR TEST at T10 May 3 rd – June 2 nd MOTIVATION REQUIREMENTS STATUS OF SYSTEM TIME SCHEDULE CONCLUSIONS

February 12th , 2004Heidelberg TPC Meeting J.B.

STATUSSTATUS(FE ELCTRONIC)(FE ELCTRONIC)FE ELECTRONIC CARDS --- complete

COOLING PLATES ---30 arrived at CERN (43 needed)

COOLING SYSTEM --- manifold under work

CAPTON CABLE--- 200 available / 200 ordered

CONNECTION TO RCU--- TO BE TESTED

Page 14: February 12 th, 2004 Heidelberg TPC Meeting J.B. TPC SECTOR TEST at T10 May 3 rd – June 2 nd MOTIVATION REQUIREMENTS STATUS OF SYSTEM TIME SCHEDULE CONCLUSIONS

February 12th , 2004Heidelberg TPC Meeting J.B.

STATUS STATUS (T10 BEAM AREA)(T10 BEAM AREA)WORK STARTS BY FEBRUARY 17th NOT CLEAR WHICH SUPPORT TABLE

WILL BE USED

Page 15: February 12 th, 2004 Heidelberg TPC Meeting J.B. TPC SECTOR TEST at T10 May 3 rd – June 2 nd MOTIVATION REQUIREMENTS STATUS OF SYSTEM TIME SCHEDULE CONCLUSIONS

February 12th , 2004Heidelberg TPC Meeting J.B.

STATUS RCUSTATUS RCU

AT PRESENT WE TAKE DATA WITH “OLD” RCU CARD AND 8 FE CARDS

THE FINAL RCU WAS NOT YET TESTED !

Page 16: February 12 th, 2004 Heidelberg TPC Meeting J.B. TPC SECTOR TEST at T10 May 3 rd – June 2 nd MOTIVATION REQUIREMENTS STATUS OF SYSTEM TIME SCHEDULE CONCLUSIONS

February 12th , 2004Heidelberg TPC Meeting J.B.

SCHEDULE SCHEDULE (BEAM AREA/ BEAM TIME)(BEAM AREA/ BEAM TIME)BEAM AREA WILL BE CLOSED BY

MAY 3rd

FROM MAY 3rd – MAY 18th (no M-STRIP TELESCOPE)

FROM MAY 19th – JUNE 2nd (M-STRIP TELESCOPE AVAILABLE)

Page 17: February 12 th, 2004 Heidelberg TPC Meeting J.B. TPC SECTOR TEST at T10 May 3 rd – June 2 nd MOTIVATION REQUIREMENTS STATUS OF SYSTEM TIME SCHEDULE CONCLUSIONS

February 12th , 2004Heidelberg TPC Meeting J.B.

SCHEDULE AND DEADLINESSCHEDULE AND DEADLINES(RCU/DDL/TRIGGER)(RCU/DDL/TRIGGER)ARRIVAL OF FINAL(*) RCU

CARD AT CERN BY MARCH 15th (2004)

STABLE OPERATION OF COMPLETE SYSTEM AT T10 BY APRIL 15th (2004)

Page 18: February 12 th, 2004 Heidelberg TPC Meeting J.B. TPC SECTOR TEST at T10 May 3 rd – June 2 nd MOTIVATION REQUIREMENTS STATUS OF SYSTEM TIME SCHEDULE CONCLUSIONS

February 12th , 2004Heidelberg TPC Meeting J.B.

SCHEDULE SCHEDULE (installation)(installation)Installation of FE electronics

Installation of TPC / FIELD CAGE IN T10

Page 19: February 12 th, 2004 Heidelberg TPC Meeting J.B. TPC SECTOR TEST at T10 May 3 rd – June 2 nd MOTIVATION REQUIREMENTS STATUS OF SYSTEM TIME SCHEDULE CONCLUSIONS

February 12th , 2004Heidelberg TPC Meeting J.B.

CONCLUSIONS (1) CONCLUSIONS (1)

WE ACCUMULATED SO FAR WITH 8 FE CARDS 40k EVENTS

-- HIGH MULITPLICITY, SINGLE TRACKS (Summary by Marek and Marian)

BEAM TEST IS UNIQUE CHANCE TO COMPLETE THE TEST PROGRAM

Page 20: February 12 th, 2004 Heidelberg TPC Meeting J.B. TPC SECTOR TEST at T10 May 3 rd – June 2 nd MOTIVATION REQUIREMENTS STATUS OF SYSTEM TIME SCHEDULE CONCLUSIONS

February 12th , 2004Heidelberg TPC Meeting J.B.

CONCLUSIONS (2) CONCLUSIONS (2)

ONLY THE COMBINATION OF ALL FE CARDS WITH THE FINAL RCU (ALL FUNCTIONALITY) WILL ALLOW US :

-- TO PERFORM THE COMPLETE CALIBRATION PROGRAM

-- TO TEST THE FUNCTIONALITY UNDER “REALISTIC CONDITIONS”

Page 21: February 12 th, 2004 Heidelberg TPC Meeting J.B. TPC SECTOR TEST at T10 May 3 rd – June 2 nd MOTIVATION REQUIREMENTS STATUS OF SYSTEM TIME SCHEDULE CONCLUSIONS

February 12th , 2004Heidelberg TPC Meeting J.B.

CONCLUSIONS (3) CONCLUSIONS (3) (risk/performance) (risk/performance)THE FIELD CAGE AND GAS SYSTEM

ARE OLD !(RISK OF DAMAGE DURING TRANSPORT)

THE MATERIAL BUDGET OF THE FIELD CAGE IS NOT AS IN THE FINAL ALICE EXPERIMENT !

Page 22: February 12 th, 2004 Heidelberg TPC Meeting J.B. TPC SECTOR TEST at T10 May 3 rd – June 2 nd MOTIVATION REQUIREMENTS STATUS OF SYSTEM TIME SCHEDULE CONCLUSIONS

February 12th , 2004Heidelberg TPC Meeting J.B.

CONCLUSIONS (4) CONCLUSIONS (4) (MOUNTING OF FE CARDS)(MOUNTING OF FE CARDS)FINAL MOUNTING OF FE CARDS

CAN NOT BE TESTED DUE TO DIFFERENT SUPPORT STRUCTURE

Page 23: February 12 th, 2004 Heidelberg TPC Meeting J.B. TPC SECTOR TEST at T10 May 3 rd – June 2 nd MOTIVATION REQUIREMENTS STATUS OF SYSTEM TIME SCHEDULE CONCLUSIONS

February 12th , 2004Heidelberg TPC Meeting J.B.

SUMMARY PARAMETERSUMMARY PARAMETER

BEAM ENERGY (0.5,..,7 GeV/c)BEAM STRUCTURE PARTICLE COMPOSITION (p,pi+/pi-,e)RESOLUTION OF SILICON (~ 3 um)INTERACTION MATERIAL (5mm Al)