Upload
others
View
0
Download
0
Embed Size (px)
Citation preview
STS-130/20A FD 11 Execute Package MSG Page(s) Title
134A 1 - 14 FD11 Flight Plan Revision (Not Printed Onboard)
135 15 - 16 FD11 Mission Summary (Not Printed Onboard)
136 --- Daily Summary (Electronic only. Not Printed Onboard)
137 17 - 37 Stowage Locations for FD11 (GMT 049) (Not Printed Onboard)
138 38 - 39 FD11 Transfer Message (Printed Onboard)
139 40 - 53 STS-130/20A EVA Restow & 19A Tool Config (Printed Onboard)
140 54 - 66 3.2.711 Rotation Hand Controller Fabric Boot Installation (Printed Onboard)
141 67 MPC-DTV MUX Cable Swap Out (Not Printed Onboard)
143 68 - 70 Node 3 UIP Closeout Installation (Printed Onboard)
144 71 - 86 1.154 OGS Rack Transfer LAB to NODE 3 (Printed Onboard)
145 87 FD11 Crew Choice Downlink (Not Printed Onboard)
146 88 FD11 EVA Deltas (Not Printed Onboard)
147 --- Fireport Label Updates (Not Printed Onboard)
148 89 FD11 Reboost Procedure (Printed Onboard)
149B 90 Updated LiOH Cue Card (Printed Onboard)
150 --- IMMT Results - 2/17/10 (Electronic only. Not Printed Onboard)
151A --- FD11 VIP Call (Electronic only. Printed Onboard)
154 91 Post EVA 3 EV-1 Glove Area of Interest (Not Printed Onboard) Approved by FAO: R. Smith Last Updated: Feb 17 2010 9:06 PM GMT JEDI (Joint Execute package Development and Integration), v3.0
After seeing so much of Mr. Alibaruho on NASA Select,
Hollywood just had to have him in their next series:
Star Trek ‐ Defiant Generation
So…have you figured out where to schedule the reboost?
MSG 134A (22-0759A) - FD11 FLIGHT PLAN REVISION Page 1 of 14
1 MSG INDEX 2
3 MSG NO. TITLE 4
5 6 7 8 9
10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
MSG-134 FD11 Flight Plan Revision MSG-135 FD11 Mission Summary MSG-136 Daily Summary MSG-137 Stowage Locations for FD11 (GMT 049) MSG-138 FD11 Transfer Message MSG-139 STS-130/20A EVA Restow & 19A Tool Config MSG-140 3.2.711 Rotation Hand Controller Fabric Boot Installation MSG-141 MPC-DTV MUX Cable Swap Out MSG-143 Node 3 UIP Closeout Installation MSG-144 1.154 OGS Rack Transfer LAB to NODE 3 MSG-145 FD11 Crew Choice Downlink MSG-146 FD11 EVA Deltas MSG-147 Fireport Label Updates MSG-148 FD11 Reboost Procedure MSG-149 Updated LiOH Cue Card MSG-150 IMMT Results - 2/17/10 MSG-151 FD11 VIP Call MSG-154 Post EVA 3 EV-1 Glove Area of Interest 1. Post-Sleep Cryo Config 25
26
27
28
29 30
31 32 33
For today's Post-Sleep cryo config, O2 tanks 2 & 5 will be active with tank 3 configured due to the potential of destratification during reboost. H2 tanks 2 and 4 will be active. R1 O2,H2 MANF VLV TK2 (two) - OP (tb-OP) O2 TK3 HTR A - AUTO
Pre-Sleep Cryo Config 34
35
36 37
38
39
40
41
42 43
√MCC for deltas prior to configuring for Pre-Sleep. For tonight's Pre-Sleep cryo config, Manifold 2 will be closed with O2 tanks 2 and 5 active and H2 tanks 2 and 4 active. R1 O2 TK3 HTR A - OFF
O2,H2 MANF VLV TK2 (two) - CL (tb-CL) 2. Updated LiOH Cue Card 44
MSG 149 contains an updated LiOH Cue Card. Use this cue card for FD11 and subsequent LiOH can changeouts.
45 46 47 48 49 50
Page 1 of 14, MSG 134A (22-0759A) 1
MSG 134A (22-0759A) - FD11 FLIGHT PLAN REVISION Page 2 of 14
Page 2 of 14, MSG 134A (22-0759A)
1 3. ECLSS Rack Transfer 2
During the ECLSS Rack transfer, Shuttle crew assigned to using the WHC should go back to using the WCS. After ECLSS rack transfer is complete, check with MCC for Go to resume using the WHC.
3 4 5 6
4. Post EVA 3 Glove Inspection 7 Bob and Nick, ground analysis of the Post EVA 3 glove photos have cleared both EV-1 and EV-2 right gloves. EV-2’s left glove has been declared NO GO for contingency EVA due to loss of RTV on the thumb. There is an area of concern on EV-1’s left glove, for which we would like additional inspection and photos; see MSG 154 Post EVA 3 EV-1 Glove Area of Interest. During DPC we will be asking TJ to take photographs of the gloves, please join him for the inspection. Regardless of the results of the inspection, we will have you place both pairs of prime gloves into Bag G for early destow and inspection during the reconfig; but the inspection will determine whether this glove would be usable for a contingency EVA.
8 9
10
11
12
13
14 15 16 17
5. EMU Reconfig and Transfer 18 MSG 142 will contain an updated version of EMU Reconfig and Transfer. That msg is still in work but will be uplinked prior to the scheduled activity.
19
20 21
6. For Terry and Soichi 22 Today, we have scheduled the Cupola Corner Panel Installation task. MSG 153 is being developed to address the interference between the Cupola Corner Panels and the Node 3/Cupola vestibule hardware TJ pointed out yesterday. The procedure may not be onboard by morning DPC. In addition to removing the interfering CBM and vestibule hardware, the procedure will also contain steps to drill a hole in Cupola Panels 2 and 4 to accommodate the Hatch Seal Leak Check Port blind gland & nut.
23 24 25 26 27 28 29
31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50
7. REPLACE PAGES 2-38 THROUGH 2-41 and 3-116 THROUGH 3-123. 30
2
FLT PLN/130/FLT
FD11
ZAMK
A
VIRT
S
HIRE
PATR
ICK
ROBI
NSON
BEHN
KEN
NO EXERCISE
[DURING DEADBAND
COLLAPSE]
REPLANNED
EXERCISE CONSTRAINT
[Only CEVIS, TVIS, T2, ARED and Shuttle Ergometer
exercise allowed during VRCS attitude control]
*TO
ISS
2-38
S T S - 1 3 0 S T S ISS
22
23
02/18
01
02
03
04
05
06
07
08
09
GMT 02/17/10 (048)
12
13
14
15
16
17
18
19
20
21
22
23
010/00
MET
Day 009
CDR
A T T H / O *
M N V R @
REBOOST
CONFIG
3
M N V R %
WRS2 XFER
POST SLEEP
L O G
I M UOGS XFER
MEAL
EXERCISE
XFER OPS
CREW
D/L
POST SLEEP
D A P D D C
A T T H / O *
♣N 2 - I
PLT
O B S S #
BOOT
INSTALL
BUMPER
INSTALL
POST SLEEP
L O G
W H C
K A B I N
R P L CMEAL
CREW
D/L
POST SLEEP
REBOOST
CONFIG
3
FLTR CLN
- INSPECT
M U XCUP CORNER PANEL T/S
W C S #
E X E R
PS
CUP CORNER PANEL T/S
MS1
O B S S #
M Y C O
C L C T
POST
SLEEP
MEAL
EXERCISE
X F E R
U P D A T E
XFER OPS
CREW
D/L
POST SLEEP
XFER OPS
N3 UIP CLOSEOUT
INST
XFER OPS
MS2
WRS 1 XFER
WRS DEMATES
MT-PPA LR-RMV
WRS 1 MT
POST SLEEP
OGS DMT
WHC XFER
MEAL
EXERCISE
CREW
D/L
POST SLEEP
XFER OPS
MS3
EVA RECONFIG & XFER
A S P I R I N
L O GPOST SLEEP
MEAL
EXERCISE
CREW
D/L
POST SLEEP
ISS A/L TOOL STOW
MS4
EVA RECONFIG & XFER
SAFER C/O &
SWAP
SAFER
XFER
POST SLEEP
A S P I R I N
MEAL
EXERCISE
CREW
D/L
POST SLEEP
ISS A/L TOOL STOW
M D D K C KDAY/NIGHT
ORBIT
151
152
153
154
155
156
157
158
TDRS
W E Z
BIAS -XLV -ZVV
REBOOST
ORB ATT
TDRS
AVAIL
♣CWC INIT #7
*TO
STS@REBOOST
%TEA
#MNVR TO UNDOCK
#COMPACT
NOTES
2-38
FD11
ZAMK
A
VIRT
S
HIRE
PATR
ICK
ROBI
NSON
BEHN
KEN
NO EXERCISE
[DURING DEADBAND
COLLAPSE]
REPLANNED
EXERCISE CONSTRAINT
[Only CEVIS, TVIS, T2, ARED and Shuttle Ergometer
exercise allowed during VRCS attitude control]
*TO
ISS
S T S - 1 3 0 S T S ISS
22
23
02/18
01
02
03
04
05
06
07
08
09
GMT 02/17/10 (048)
12
13
14
15
16
17
18
19
20
21
22
23
010/00
MET
Day 009
CDR
A T T H / O *
M N V R @
REBOOST
CONFIG
3
M N V R %
WRS2 XFER
POST SLEEP
L O G
I M UOGS XFER
MEAL
EXERCISE
XFER OPS
CREW
D/L
POST SLEEP
D A P D D C
A T T H / O *
♣N 2 - I
PLT
O B S S #
BOOT
INSTALL
BUMPER
INSTALL
POST SLEEP
L O G
W H C
K A B I N
R P L CMEAL
CREW
D/L
POST SLEEP
REBOOST
CONFIG
3
FLTR CLN
- INSPECT
M U XCUP CORNER PANEL T/S
W C S #
E X E R
PS
CUP CORNER PANEL T/S
MS1
O B S S #
M Y C O
C L C T
POST
SLEEP
MEAL
EXERCISE
X F E R
U P D A T E
XFER OPS
CREW
D/L
POST SLEEP
XFER OPS
N3 UIP CLOSEOUT
INST
XFER OPS
MS2
WRS 1 XFER
WRS DEMATES
MT-PPA LR-RMV
WRS 1 MT
POST SLEEP
OGS DMT
WHC XFER
MEAL
EXERCISE
CREW
D/L
POST SLEEP
XFER OPS
MS3
EVA RECONFIG & XFER
A S P I R I N
L O GPOST SLEEP
MEAL
EXERCISE
CREW
D/L
POST SLEEP
ISS A/L TOOL STOW
MS4
EVA RECONFIG & XFER
SAFER C/O &
SWAP
SAFER
XFER
POST SLEEP
A S P I R I N
MEAL
EXERCISE
CREW
D/L
POST SLEEP
ISS A/L TOOL STOW
M D D K C KDAY/NIGHT
ORBIT
151
152
153
154
155
156
157
158
TDRS
W E ZORB ATT
BIAS -XLV -ZVV
REBOOST
TDRS
AVAIL
NOTES
♣CWC INIT #7
*TO
STS@REBOOST
%TEA
#MNVR TO UNDOCK
#COMPACT
3
FLT PLN/130/FLT
FD11
WILL
IAMS
SURA
EV
KOTO
V
CREA
MER
NOGU
CHI
REPLANNED
NO EXERCISE
[DURING DEADBAND
COLLAPSE]
EXERCISE CONSTRAINT
[Only CEVIS, TVIS, T2, ARED and Shuttle Ergometer
exercise allowed during VRCS attitude control]
2-39
I S S E X P 2 2 STS
22
23
02/18
01
02
03
04
05
06
07
08
09
GMT 02/17/10 (048)
12
13
14
15
16
17
18
19
20
21
22
23
010/00
MET
Day 009
TDRS
AVAIL
DAY/NIGHT
DAILY ORBIT
12
34
56
78
132
112
132
112
122
112
142
TLM FORMAT
-XVV +ZLV TEA
ATTITUDE
ALL VHF
TDRS
W E Z
BIAS -XLV -ZVV
REBOOST
ORB ATT
ISS
CDR
R E A C T
POST SLEEP
♣CREW
D/L
P A ODPC
ARED
⊕♦
P / T V
I M A G E R Y
WHC
DMT
MEAL
WHC XFER
♥∆
OGS XFER
OGS UMB
MT
QD CNCT
T2
H2
SNSR
CNCT
FE-1
POST SLEEP
♠CREW
D/L
φ DPCPW
СВ-В2-MNT1
TVIS
TVIS
•И П - 1
MEAL
БИО5D/L
∇МБИ-20-FE1-EXE
FE-4
POST SLEEP
♠CREW
D/L
◊ DPC
PW
PW
∗СОЖ-MNT
♣VELO
⊕♦
MEAL
♥
TVIS
∆
FE-5
♠
R E A C T
φPOST
SLEEP
P O S T
S L E E P
P O S T
S L E E P
CREW
D/L
DPC
P C S P / D
TOCA
C E V I S
H / W R M V
C R B R M V
•
C E V I S
H W I N S T
∇ARED
RAM INSTL
RAM INSTL
◊MEAL
CUP
CORNER
PANEL
T/S
T2
SODF
UPDATE
FE-6
∗D R Y
R E A C T
P O S T
S L E E P
♠
P O S T
S L E E P
HD
SUCREW
D/L
♣ DPC
⊕♦
•
G C / D M S
G C / D M S
♥WRS 1 XFER
WRS2 XFER
WRS 2 MT
MEAL
W H C
M A T E
W H C A C T
∆
S H U T T E R
T2
W H C
K A B I N
R P L CARED
♠φ
♣POST SLEEP
⊕T2-TOOL-FIT-CHECK
♦P/TV S/U ALTEA-HW-RELOCATE
♥WRS-QD-TRBLSHOOT
∆CNDS TANK DSCNCT
♠POST SLEEP
φТЕХ-15-DAKON-CK
•БТХ-39-PHOTO
∇IMS-EDIT
◊СОГС-ЭЛЕК-АФ-БЖ-MON
∗БТХ-39-ON (+37)
♣ЭЛКТ-БЖ-ЗИП-PRESS
⊕БТХ-39-РПР-ПОДГ
♦БТХ-39-МТЖ-ОТБОР1
БТХ-39-CK
♥БТХ-39-ИЗВЛ1
∆ПЗЭ-МО-10-PREP
♠MYCO-ISS SAMPLE-CLCT
φMYCO-20A-MELFI INS
•KABIN RMV
∇WHC DEACT
◊JPM-SHUTTER-CL
∗MYCO-ISS SAMPLE-CLCT
♣ORCA-CYCLES-CHECK
⊕LIOH-CAN-RELOCATE
♦NODE3-RAMV-C/O
NOD3D5-RACK-PREP
♥P/TV-XFER VID-S/U
∆N3 WHC-HYG CVR-INSTL
♠FIREPORT-UPDATE
φP/TV-XFER VID-DEACT
NOTES
2-39
FD11
WILL
IAMS
SURA
EV
KOTO
V
CREA
MER
NOGU
CHI
REPLANNED
NO EXERCISE
[DURING DEADBAND
COLLAPSE]
EXERCISE CONSTRAINT
[Only CEVIS, TVIS, T2, ARED and Shuttle Ergometer
exercise allowed during VRCS attitude control]
I S S E X P 2 2 STS
22
23
02/18
01
02
03
04
05
06
07
08
09
GMT 02/17/10 (048)
12
13
14
15
16
17
18
19
20
21
22
23
010/00
MET
Day 009
TDRS
AVAIL
DAY/NIGHT
DAILY ORBIT
12
34
56
78
TLM FORMAT
132
112
132
112
122
112
142
ATTITUDE
-XVV +ZLV TEA
ALL VHF
TDRS
W E ZORB ATT
BIAS -XLV -ZVV
REBOOST
ISS
CDR
R E A C T
POST SLEEP
♣CREW
D/L
P A ODPC
ARED
⊕♦
P / T V
I M A G E R Y
WHC
DMT
MEAL
WHC XFER
♥∆
OGS XFER
OGS UMB
MT
QD CNCT
T2
H2
SNSR
CNCT
FE-1
POST SLEEP
♠CREW
D/L
φ DPCPW
СВ-В2-MNT1
TVIS
TVIS
•И П - 1
MEAL
БИО5D/L
∇МБИ-20-FE1-EXE
FE-4
POST SLEEP
♠CREW
D/L
◊ DPC
PW
PW
∗СОЖ-MNT
♣VELO
⊕♦
MEAL
♥
TVIS
∆
FE-5
♠
R E A C T
φPOST
SLEEP
P O S T
S L E E P
P O S T
S L E E P
CREW
D/L
DPC
P C S P / D
TOCA
C E V I S
H / W R M V
C R B R M V
•
C E V I S
H W I N S T
∇ARED
RAM INSTL
RAM INSTL
◊MEAL
CUP
CORNER
PANEL
T/S
T2
SODF
UPDATE
FE-6
∗D R Y
R E A C T
P O S T
S L E E P
♠
P O S T
S L E E P
HD
SUCREW
D/L
♣ DPC
⊕♦
•
G C / D M S
G C / D M S
♥WRS 1 XFER
WRS2 XFER
WRS 2 MT
MEAL
W H C
M A T E
W H C A C T
∆
S H U T T E R
T2
W H C
K A B I N
R P L CARED
♠φ
NOTES
♣POST SLEEP
⊕T2-TOOL-FIT-CHECK
♦P/TV S/U ALTEA-HW-RELOCATE
♥WRS-QD-TRBLSHOOT
∆CNDS TANK DSCNCT
♠POST SLEEP
φТЕХ-15-DAKON-CK
•БТХ-39-PHOTO
∇IMS-EDIT
◊СОГС-ЭЛЕК-АФ-БЖ-MON
∗БТХ-39-ON (+37)
♣ЭЛКТ-БЖ-ЗИП-PRESS
⊕БТХ-39-РПР-ПОДГ
♦БТХ-39-МТЖ-ОТБОР1
БТХ-39-CK
♥БТХ-39-ИЗВЛ1
∆ПЗЭ-МО-10-PREP
♠MYCO-ISS SAMPLE-CLCT
φMYCO-20A-MELFI INS
•KABIN RMV
∇WHC DEACT
◊JPM-SHUTTER-CL
∗MYCO-ISS SAMPLE-CLCT
♣ORCA-CYCLES-CHECK
⊕LIOH-CAN-RELOCATE
♦NODE3-RAMV-C/O
NOD3D5-RACK-PREP
♥P/TV-XFER VID-S/U
∆N3 WHC-HYG CVR-INSTL
♠FIREPORT-UPDATE
φP/TV-XFER VID-DEACT
4
FLT PLN/130/FLT
FD11
ZAMK
A
VIRT
S
HIRE
PATR
ICK
ROBI
NSON
BEHN
KEN
REPLANNED
2-40
S T S - 1 3 0 S T S ISS
10
11
12
13
14
15
16
17
18
19
20
21
GMT 02/18/10 (049)
010/00
01
02
03
04
05
06
07
08
09
10
11
12
MET
Day 010
CDR
POST
SLEEP
L O G
PRE
SLEEP
F D C O N F
PRE SLEEP
SLEEP
PMC
A/G
♣C W C
T E R M
C W C X F R
N 2 - T
PLT
POST
SLEEP
L O GPRE SLEEP
SLEEP
EXER
MS1
POST
SLEEP
PRE SLEEP
X F E R
T A G U P
X F E R
B R I E F
SLEEP
X F E R
O P S
MS2
POST
SLEEP
PRE SLEEP
SLEEP
X F E R
O P S
MS3
POST
SLEEP
L O GPRE SLEEP
SLEEP
MS4
POST
SLEEP
PRE SLEEP
M D D K C K
SLEEP
DAY/NIGHT
ORBIT
159
160
161
162
163
164
165
166
TDRS
W E Z
BIAS -XLV -ZVV
ORB ATT
TDRS
AVAIL
♣CWC INIT #7
NOTES
2-40
FD11
ZAMK
A
VIRT
S
HIRE
PATR
ICK
ROBI
NSON
BEHN
KEN
REPLANNED
S T S - 1 3 0 S T S ISS
10
11
12
13
14
15
16
17
18
19
20
21
GMT 02/18/10 (049)
010/00
01
02
03
04
05
06
07
08
09
10
11
12
MET
Day 010
CDR
POST
SLEEP
L O G
PRE
SLEEP
F D C O N F
PRE SLEEP
SLEEP
PMC
A/G
♣C W C
T E R M
C W C X F R
N 2 - T
PLT
POST
SLEEP
L O GPRE SLEEP
SLEEP
EXER
MS1
POST
SLEEP
PRE SLEEP
X F E R
T A G U P
X F E R
B R I E F
SLEEP
X F E R
O P S
MS2
POST
SLEEP
PRE SLEEP
SLEEP
X F E R
O P S
MS3
POST
SLEEP
L O GPRE SLEEP
SLEEP
MS4
POST
SLEEP
PRE SLEEP
M D D K C K
SLEEP
DAY/NIGHT
ORBIT
159
160
161
162
163
164
165
166
TDRS
W E ZORB ATT
BIAS -XLV -ZVV
TDRS
AVAIL
NOTES
♣CWC INIT #7
5
FLT PLN/130/FLT
WILL
IAMS
SURA
EV
KOTO
V
CREA
MER
NOGU
CHI
FD11
REPLANNED
2-41
I S S E X P 2 2 STS
10
11
12
13
14
15
16
17
18
19
20
21
GMT 02/18/10 (049)
010/00
01
02
03
04
05
06
07
08
09
10
11
12
MET
Day 010
TDRS
AVAIL
DAY/NIGHT
DAILY ORBIT
910
11
12
13
14
15
16
142
122
112
TLM FORMAT
-XVV +ZLV TEA
ATTITUDE
ALL VHF
TDRS
W E Z
BIAS -XLV -ZVV
ORB ATT
ISS
CDR
H2
SNSR
CNCT
DPCPW
PRE SLEEP-ISS
R E A C T
SLEEP
POST
SLEEP
B L D O P R
FE-1
PW
PW
DPC
PRE SLEEP-ISS
SLEEP
POST
SLEEP
FE-4
PW
PW
♣ DPC
PRE SLEEP-ISS
SLEEP
POST
SLEEP
FE-5
PW
PW
DPC
PRE SLEEP-ISS
R E A C T
SLEEP
POST
SLEEP
FE-6
DPCPW
PRE SLEEP-ISS
R E A C T
SLEEP
P R O K ^
S A L V A
BLD
SU
B L O O D
♣СОГС-ЭЛЕК-АФ-БЖ-MON
^URN PH TEST
NOTES
2-41
WILL
IAMS
SURA
EV
KOTO
V
CREA
MER
NOGU
CHI
FD11
REPLANNED
I S S E X P 2 2 STS
10
11
12
13
14
15
16
17
18
19
20
21
GMT 02/18/10 (049)
010/00
01
02
03
04
05
06
07
08
09
10
11
12
MET
Day 010
TDRS
AVAIL
DAY/NIGHT
DAILY ORBIT
910
11
12
13
14
15
16
TLM FORMAT
142
122
112
ATTITUDE
-XVV +ZLV TEA
ALL VHF
TDRS
W E ZORB ATT
BIAS -XLV -ZVV
ISS
CDR
H2
SNSR
CNCT
DPCPW
PRE SLEEP-ISS
R E A C T
SLEEP
POST
SLEEP
B L D O P R
FE-1
PW
PW
DPC
PRE SLEEP-ISS
SLEEP
POST
SLEEP
FE-4
PW
PW
♣ DPC
PRE SLEEP-ISS
SLEEP
POST
SLEEP
FE-5
PW
PW
DPC
PRE SLEEP-ISS
R E A C T
SLEEP
POST
SLEEP
FE-6
DPCPW
PRE SLEEP-ISS
R E A C T
SLEEP
P R O K ^
S A L V A
BLD
SU
B L O O D
NOTES
♣СОГС-ЭЛЕК-АФ-БЖ-MON
^URN PH TEST
6
FLT PLN/130/FLT
ZAMK
AVI
RTS
HIRE
11
FD11 EZ ACTIVITIES:
√O
CAC
FILT
ER &
MDD
K DU
CT S
CREE
N
TEPC (
STAT
US C
HECK
) (
ORB
OPS,
CRE
W SY
S) HA
RD R
EBOO
T AL
L PG
SCs
EXCE
PT:
S
TS-6
(WLE
S),S
TS-5
(RPO
P2),
& O
CA R
OUTE
R.
Return all Shuttle IFM tools
used on ISS, per MSG 052, to
End
eavo
ur p
rior
to
slee
p.
REPLANNED
3.2.711 ROTATION HAND CONTROLLER FABRIC
BOOT INSTALLATION Ref. MSG 140
3-116
STS-
130
FD
22:00
23:00
00:00
01:00
GMT
Date
02/17
(048)
12:00
13:00
14:00
15:00
16:00
MET
Day 009
WE
Z
T D R S
~
~ ~
~
D / N
O R B 1 5 1 1 5 2 1 5 3
~ ~B I A S - X L V - Z V VS T S A T T
CDR
POST-SLEEP ACTIVITY
(ORB OPS, CREW SYS)
SLEEP LOGBOOK (ORB OPS, SDBI)
IMU STAR OF OPPTY ALIGN (ORB OPS, GNC)
TRANSFER OPS
Ref. Transfer List & MSG 138
~
PUBLIC AFFAIRS EVENT
ISS KU AVAIL: 12:53-13:32
Ref. MSG 151
POST-SLEEP ACTIVITY
(ORB OPS, CREW SYS)
PLT
OBSS MNVR TO UNDOCK
(PDRS, OBSS NOMINAL) ~
1.186 RWS VIDEO MONITOR ORU BUMPER INSTALL
(ASSY OPS, ACT & C/O)
POST-SLEEP ACTIVITY
(ORB OPS, CREW SYS)
SLEEP LOGBOOK (ORB OPS, SDBI)
PUBLIC AFFAIRS EVENT
ISS KU AVAIL: 12:53-13:32
Ref. MSG 151
POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)
MPC-DTV MUX CABLE SWAP OUT
Ref. MSG 141
WCS COMPACTOR OPS (DUAL-VANE)
(ORB OPS, CUE CARD)
POST-SLEEP ACTIVITY
(ORB OPS, CREW SYS)
MS1
OBSS MNVR TO UNDOCK
(PDRS, OBSS NOMINAL)
MYCO BODY SAMPLE COLLECTION
(ASSY OPS, P/L)
POST-SLEEP ACTIVITY
(ORB OPS, CREW SYS)
EXERCISE
TRANSFER UPDATE
Ref. Transfer List & MSG 138
PUBLIC AFFAIRS EVENT
ISS KU AVAIL: 12:53-13:32
Ref. MSG 151
POST-SLEEP ACTIVITY
(ORB OPS, CREW SYS)
Notes
3-116
ZAMK
AVI
RTS
HIRE
11
FD11 EZ ACTIVITIES:
√O
CAC
FILT
ER &
MDD
K DU
CT S
CREE
N
TEPC (
STAT
US C
HECK
) (
ORB
OPS,
CRE
W SY
S) HA
RD R
EBOO
T AL
L PG
SCs
EXCE
PT:
S
TS-6
(WLE
S),S
TS-5
(RPO
P2),
& O
CA R
OUTE
R.
Return all Shuttle IFM tools
used on ISS, per MSG 052, to
End
eavo
ur p
rior
to
slee
p.
REPLANNED
3.2.711 ROTATION HAND CONTROLLER FABRIC
BOOT INSTALLATION Ref. MSG 140
STS-
130
FD
22:00
23:00
00:00
01:00
GMT
Date
02/17
(048)
12:00
13:00
14:00
15:00
16:00
MET
Day 009
WE
Z
T D R SD / N
O R B 1 5 1 1 5 2 1 5 3
S T S A T T ~ ~B I A S - X L V - Z V V
CDR
POST-SLEEP ACTIVITY
(ORB OPS, CREW SYS)
SLEEP LOGBOOK (ORB OPS, SDBI)
IMU STAR OF OPPTY ALIGN (ORB OPS, GNC)
~
TRANSFER OPS
Ref. Transfer List & MSG 138
PUBLIC AFFAIRS EVENT
ISS KU AVAIL: 12:53-13:32
Ref. MSG 151
POST-SLEEP ACTIVITY
(ORB OPS, CREW SYS)
PLT
OBSS MNVR TO UNDOCK
(PDRS, OBSS NOMINAL) ~
1.186 RWS VIDEO MONITOR ORU BUMPER INSTALL
(ASSY OPS, ACT & C/O)
POST-SLEEP ACTIVITY
(ORB OPS, CREW SYS)
SLEEP LOGBOOK (ORB OPS, SDBI)
PUBLIC AFFAIRS EVENT
ISS KU AVAIL: 12:53-13:32
Ref. MSG 151
POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)
MPC-DTV MUX CABLE SWAP OUT
Ref. MSG 141
WCS COMPACTOR OPS (DUAL-VANE)
(ORB OPS, CUE CARD)
POST-SLEEP ACTIVITY
(ORB OPS, CREW SYS)
MS1
OBSS MNVR TO UNDOCK
(PDRS, OBSS NOMINAL)
MYCO BODY SAMPLE COLLECTION
(ASSY OPS, P/L)
POST-SLEEP ACTIVITY
(ORB OPS, CREW SYS)
EXERCISE
TRANSFER UPDATE
Ref. Transfer List & MSG 138
PUBLIC AFFAIRS EVENT
ISS KU AVAIL: 12:53-13:32
Ref. MSG 151
POST-SLEEP ACTIVITY
(ORB OPS, CREW SYS)
Notes
7
FLT PLN/130/FLT
ROBI
NSON
PATR
ICK
BEHN
KEN
11 REPLANNED
3-117
STS-
130
FD
22:00
23:00
00:00
01:00
GMT
Date
02/17
(048)
12:00
13:00
14:00
15:00
16:00
MET
Day 009
WE
Z
T D R S
~
~ ~
~
D / N
O R B 1 5 1 1 5 2 1 5 3
~ ~B I A S - X L V - Z V VS T S A T T
MS2
1.150 WRS-1 & WRS-2 RACK XFER LAB TO NOD3
(ASSY OPS, ACT&C/O)
Steps 5-10.4 for WRS-1 (LAB1D4)
~
1.150 WRS-1 & WRS-2 RACK XFER LAB TO NOD3
(ASSY OPS, ACT&C/O)
Steps 1-4, Step 1.6 not required
POST-SLEEP ACTIVITY
(ORB OPS, CREW SYS)
PUBLIC AFFAIRS EVENT
ISS KU AVAIL: 12:53-13:32
Ref. MSG 151
POST-SLEEP ACTIVITY
(ORB OPS, CREW SYS)
MS3
EVA CREW: TAKE 1 ASPIRIN (325mg)
SLEEP LOGBOOK (ORB OPS, SDBI)
POST-SLEEP ACTIVITY
(ORB OPS, CREW SYS)
EXERCISE
~
PUBLIC AFFAIRS EVENT
ISS KU AVAIL: 12:53-13:32
Ref. MSG 151
POST-SLEEP ACTIVITY
(ORB OPS, CREW SYS)
MS4
SAFER CHECKOUT & SWAP
(EVA, AIRLOCK CONFIG)
Retrieve SAFER 1003 from NOD1 D2
Retrieve SAFER 1005 from NOD3 A2
~
POST-SLEEP ACTIVITY
(ORB OPS, CREW SYS)
EVA CREW: TAKE 1 ASPIRIN (325mg)
PUBLIC AFFAIRS EVENT
ISS KU AVAIL: 12:53-13:32
Ref. MSG 151
POST-SLEEP ACTIVITY
(ORB OPS, CREW SYS)
GLACIER STATUS CHECK (ASSY OPS,CC)
Notes
3-117
ROBI
NSON
PATR
ICK
BEHN
KEN
11 REPLANNED
STS-
130
FD
22:00
23:00
00:00
01:00
GMT
Date
02/17
(048)
12:00
13:00
14:00
15:00
16:00
MET
Day 009
WE
Z
T D R SD / N
O R B 1 5 1 1 5 2 1 5 3
S T S A T T ~ ~B I A S - X L V - Z V V
MS2
~
1.150 WRS-1 & WRS-2 RACK XFER LAB TO NOD3
(ASSY OPS, ACT&C/O)
Steps 5-10.4 for WRS-1 (LAB1D4)
1.150 WRS-1 & WRS-2 RACK XFER LAB TO NOD3
(ASSY OPS, ACT&C/O)
Steps 1-4, Step 1.6 not required
POST-SLEEP ACTIVITY
(ORB OPS, CREW SYS)
PUBLIC AFFAIRS EVENT
ISS KU AVAIL: 12:53-13:32
Ref. MSG 151
POST-SLEEP ACTIVITY
(ORB OPS, CREW SYS)
MS3
EVA CREW: TAKE 1 ASPIRIN (325mg)
SLEEP LOGBOOK (ORB OPS, SDBI)
POST-SLEEP ACTIVITY
(ORB OPS, CREW SYS)
~EXERCISE
PUBLIC AFFAIRS EVENT
ISS KU AVAIL: 12:53-13:32
Ref. MSG 151
POST-SLEEP ACTIVITY
(ORB OPS, CREW SYS)
MS4
~
SAFER CHECKOUT & SWAP
(EVA, AIRLOCK CONFIG)
Retrieve SAFER 1003 from NOD1 D2
Retrieve SAFER 1005 from NOD3 A2
POST-SLEEP ACTIVITY
(ORB OPS, CREW SYS)
EVA CREW: TAKE 1 ASPIRIN (325mg)
PUBLIC AFFAIRS EVENT
ISS KU AVAIL: 12:53-13:32
Ref. MSG 151
POST-SLEEP ACTIVITY
(ORB OPS, CREW SYS)
GLACIER STATUS CHECK (ASSY OPS,CC)
Notes
8
FLT PLN/130/FLT
ZAMK
AVI
RTS
HIRE
11 REPLANNED
3-118
STS-
130
FD
02:00
03:00
04:00
05:00
GMT
Date
02/18
(049)
16:00
17:00
18:00
19:00
20:00
MET
Day 009
WE
Z
T D R S
~~ ~~
D / N
O R B 1 5 3 1 5 4 1 5 5 1 5 6
~ ~B I A S - X L V - Z V VS T S A T T
CDR
1.150 WRS-1 & WRS-2 RACK XFER LAB TO NOD3
(ASSY OPS, ACT&C/O)
Steps 5-end for WRS-2 (LAB1P4)
MEAL
EXERCISE
TRANSFER OPS
Ref. Transfer List & MSG 138
~
PLT
3.2.711 ROTATION HAND CONTROLLER FABRIC
BOOT INSTALLATION
Ref. MSG 140
~
MEAL
CUPOLA CORNER PANEL INTERFERENCE WORK
AROUND
Ref. MSG 153
CUPOLA CORNER PANEL INTERFERENCE WORK
AROUND
Ref. MSG 153
~
MS1
MEAL
TRANSFER OPS
Ref. Transfer List & MSG 138
TRANSFER OPS
Ref. Transfer List & MSG 138
~
Notes
3-118
ZAMK
AVI
RTS
HIRE
11 REPLANNED
STS-
130
FD
02:00
03:00
04:00
05:00
GMT
Date
02/18
(049)
16:00
17:00
18:00
19:00
20:00
MET
Day 009
WE
Z
T D R SD / N
O R B 1 5 3 1 5 4 1 5 5 1 5 6
S T S A T T ~ ~B I A S - X L V - Z V V
CDR
1.150 WRS-1 & WRS-2 RACK XFER LAB TO NOD3
(ASSY OPS, ACT&C/O)
Steps 5-end for WRS-2 (LAB1P4)
MEAL
EXERCISE
~TRANSFER OPS
Ref. Transfer List & MSG 138
PLT
~3.2.711 ROTATION HAND CONTROLLER FABRIC
BOOT INSTALLATION
Ref. MSG 140
MEAL
CUPOLA CORNER PANEL INTERFERENCE WORK
AROUND
Ref. MSG 153
~
CUPOLA CORNER PANEL INTERFERENCE WORK
AROUND
Ref. MSG 153
MS1
MEAL
TRANSFER OPS
Ref. Transfer List & MSG 138
~
TRANSFER OPS
Ref. Transfer List & MSG 138
Notes
9
FLT PLN/130/FLT
ROBI
NSON
PATR
ICK
BEHN
KEN
11 REPLANNED
3-119
STS-
130
FD
02:00
03:00
04:00
05:00
GMT
Date
02/18
(049)
16:00
17:00
18:00
19:00
20:00
MET
Day 009
WE
Z
T D R S
~~ ~~
D / N
O R B 1 5 3 1 5 4 1 5 5 1 5 6
~ ~B I A S - X L V - Z V VS T S A T T
MS2
1.150 WRS-1 & WRS-2 RACK XFER LAB TO NOD3
(ASSY OPS, ACT&C/O)
Steps 5-10.4 for WRS-1 (LAB1D4)
~
S&M: 1.341 WRS-1 UMBILICAL MATE
Steps 1.1, 1.4-end
In step 3, RPCs will show "Purple
D's" until WRS2 Umbilical Mate.
1.154 OGS RACK TRANSFER LAB TO NODE 3
Ref. MSG 144, Steps 1-6
~
1.146 WHC RACK TRANSFER
(ASSY OPS, RACK TRANSFERS)
Steps 6-end
MEAL
MS3
POST EVA RECONFIG AND TRANSFER TO SHUTTLE
(EVA, AIRLOCK CONFIG)
Temp stow EMUs in Middeck.
Will install on FD12.
Ref. MSG 142
Ref. Transfer List: Items 702,712,713,715
~
MEAL
EXERCISE
~
MS4
POST EVA RECONFIG AND TRANSFER TO SHUTTLE
(EVA, AIRLOCK CONFIG)
Temp stow EMUs in Middeck.
Will install on FD12.
Ref. MSG 142
Ref. Transfer List: Items 702,712,713,715
~
SAFER CHECKOUT & SWAP
(EVA, AIRLOCK CONFIG)
Retrieve SAFER 1003 from NOD1 D2
Retrieve SAFER 1005 from NOD3 A2
~
SAFER TRANSFER
Ref. Transfer List: Item 714
MEAL
EXERCISE
Notes
3-119
ROBI
NSON
PATR
ICK
BEHN
KEN
11 REPLANNED
STS-
130
FD
02:00
03:00
04:00
05:00
GMT
Date
02/18
(049)
16:00
17:00
18:00
19:00
20:00
MET
Day 009
WE
Z
T D R SD / N
O R B 1 5 3 1 5 4 1 5 5 1 5 6
S T S A T T ~ ~B I A S - X L V - Z V V
MS2
~1.150 WRS-1 & WRS-2 RACK XFER LAB TO NOD3
(ASSY OPS, ACT&C/O)
Steps 5-10.4 for WRS-1 (LAB1D4)
S&M: 1.341 WRS-1 UMBILICAL MATE
Steps 1.1, 1.4-end
In step 3, RPCs will show "Purple
D's" until WRS2 Umbilical Mate.
~
1.154 OGS RACK TRANSFER LAB TO NODE 3
Ref. MSG 144, Steps 1-6
1.146 WHC RACK TRANSFER
(ASSY OPS, RACK TRANSFERS)
Steps 6-end
MEAL
MS3
~
POST EVA RECONFIG AND TRANSFER TO SHUTTLE
(EVA, AIRLOCK CONFIG)
Temp stow EMUs in Middeck.
Will install on FD12.
Ref. MSG 142
Ref. Transfer List: Items 702,712,713,715
MEAL
~
EXERCISE
MS4
~
POST EVA RECONFIG AND TRANSFER TO SHUTTLE
(EVA, AIRLOCK CONFIG)
Temp stow EMUs in Middeck.
Will install on FD12.
Ref. MSG 142
Ref. Transfer List: Items 702,712,713,715
~SAFER CHECKOUT & SWAP
(EVA, AIRLOCK CONFIG)
Retrieve SAFER 1003 from NOD1 D2
Retrieve SAFER 1005 from NOD3 A2
SAFER TRANSFER
Ref. Transfer List: Item 714
MEAL
EXERCISE
Notes
10
FLT PLN/130/FLT
ZAMK
AVI
RTS
HIRE
11
B When ISS is GO for att. control, DAP: FREE
Then return to DAP A, √A12/FREE/VERN
Reconfig DAP B to B12
NO EXERCISE
[During
Deadband
Collapse]
EXERCISE
CONSTRAINT
[Only CEVIS,
TVIS, T2,
ARED and
Shuttle
Ergometer
exercise
allowed
during VRCS
attitude
control]
A N2 REPRESS USING P/L N2 VLVS
(ORB OPS, ECLS) Steps 1-6;
MCC will TMBU S/W FDA in Step 1.
On MCC go, perform Step 7.
Work the ()s for all steps performed
REPLANNED
3-120
STS-
130
FD
06:00
07:00
08:00
09:00
GMT
Date
02/18
(049)
20:00
21:00
22:00
23:00
00:00
MET
Day 009
WE
Z
T D R S
~
~~
D / N
O R B 1 5 6 1 5 7 1 5 8
~ B I A S - X L V - Z V V R E B O O S T ~B I A S - X L V - Z V VS T S A T T
CDR
H/O ATT CONTROL CMG TA to ORB:
√MCC for DAP
MNVR (TRK) REBOOST
TGT=2 BV=5 P=176 Y=0 OM=178
A12/AUTO/VERN, Init TRK
AUTO REBOOST
Ref. MSG 148
TIG: 22:17-22:50
MNVR (TRK) BIAS -XLV -ZVV
TGT=2 BV=5 P=162.71 Y=359.93 OM=167.12
A12/AUTO/VERN, Init TRK
1.154 OGS RACK TRANSFER LAB TO NODE 3
Ref. MSG 144, Steps 7-end
When ISS is GO for deadband collapse,
DAP:B13
ATT H/O TO ISS B
CWC FILL (ORB OPS, CWC OPS)
Init Fill #7, Ref. MSG 027
~
N2 REPRESS INIT A
PLT
S&M:1.280 WHC KABIN DISASSEMBLE/REASSEMBLE
Step 6 to install in NOD3F4
Setup WHC with crew preference items
(footrails, toiletries) as needed.
AUTO REBOOST
Ref. MSG 148
TIG: 22:17-22:50
FILTER CLEANING
(IFM, SCHEDULED MAINTENANCE)
Inspect filters and clean
as necessary
EXERCISE
~
CUPOLA CORNER PANEL INTERFERENCE WORK
AROUND
Ref. MSG 153
~
MS1
TRANSFER OPS
Ref. Transfer List & MSG 138
~
NODE 3 UIP CLOSEOUT HYGIENE COVER INSTALL
Ref. MSG 143
TRANSFER OPS
Ref. Transfer List & MSG 138
~
Notes
3-120
ZAMK
AVI
RTS
HIRE
11
B When ISS is GO for att. control, DAP: FREE
Then return to DAP A, √A12/FREE/VERN
Reconfig DAP B to B12
NO EXERCISE
[During
Deadband
Collapse]
EXERCISE
CONSTRAINT
[Only CEVIS,
TVIS, T2,
ARED and
Shuttle
Ergometer
exercise
allowed
during VRCS
attitude
control]
A N2 REPRESS USING P/L N2 VLVS
(ORB OPS, ECLS) Steps 1-6;
MCC will TMBU S/W FDA in Step 1.
On MCC go, perform Step 7.
Work the ()s for all steps performed
REPLANNED
STS-
130
FD
06:00
07:00
08:00
09:00
GMT
Date
02/18
(049)
20:00
21:00
22:00
23:00
00:00
MET
Day 009
WE
Z
T D R SD / N
O R B 1 5 6 1 5 7 1 5 8
S T S A T T ~ B I A S - X L V - Z V V R E B O O S T ~B I A S - X L V - Z V V
CDR
H/O ATT CONTROL CMG TA to ORB:
√MCC for DAP
MNVR (TRK) REBOOST
TGT=2 BV=5 P=176 Y=0 OM=178
A12/AUTO/VERN, Init TRK
AUTO REBOOST
Ref. MSG 148
TIG: 22:17-22:50
MNVR (TRK) BIAS -XLV -ZVV
TGT=2 BV=5 P=162.71 Y=359.93 OM=167.12
A12/AUTO/VERN, Init TRK
1.154 OGS RACK TRANSFER LAB TO NODE 3
Ref. MSG 144, Steps 7-end
When ISS is GO for deadband collapse,
DAP:B13
ATT H/O TO ISS B
~CWC FILL (ORB OPS, CWC OPS)
Init Fill #7, Ref. MSG 027
N2 REPRESS INIT A
PLT
S&M:1.280 WHC KABIN DISASSEMBLE/REASSEMBLE
Step 6 to install in NOD3F4
Setup WHC with crew preference items
(footrails, toiletries) as needed.
AUTO REBOOST
Ref. MSG 148
TIG: 22:17-22:50
FILTER CLEANING
(IFM, SCHEDULED MAINTENANCE)
Inspect filters and clean
as necessary
~
EXERCISE
~CUPOLA CORNER PANEL INTERFERENCE WORK
AROUND
Ref. MSG 153
MS1
~
TRANSFER OPS
Ref. Transfer List & MSG 138
NODE 3 UIP CLOSEOUT HYGIENE COVER INSTALL
Ref. MSG 143
~TRANSFER OPS
Ref. Transfer List & MSG 138
Notes
11
FLT PLN/130/FLT
ROBI
NSON
PATR
ICK
BEHN
KEN
11 REPLANNED
3-121
STS-
130
FD
06:00
07:00
08:00
09:00
GMT
Date
02/18
(049)
20:00
21:00
22:00
23:00
00:00
MET
Day 009
WE
Z
T D R S
~
~~
D / N
O R B 1 5 6 1 5 7 1 5 8
~ B I A S - X L V - Z V V R E B O O S T ~B I A S - X L V - Z V VS T S A T T
MS2
1.136 NODE 3 MTL PUMP PACKAGE ASSEMBLY(PPA)
LAUNCH BRACKET REMOVAL
(ASSY OPS, ACT&C/O)
1.154 OGS RACK TRANSFER LAB TO NODE 3
Ref. MSG 144, Steps 1-6
~
EXERCISE
TRANSFER OPS
Ref. Transfer List & MSG 138
~
MS3
POST EVA RECONFIG AND TRANSFER TO SHUTTLE
(EVA, AIRLOCK CONFIG)
Temp stow EMUs in Middeck.
Will install on FD12.
Ref. MSG 142
Ref. Transfer List: Items 702,712,713,715
~
ISS A/L TOOL STOW
Ref. MSG 139
Ref. MSG 146
MS4
POST EVA RECONFIG AND TRANSFER TO SHUTTLE
(EVA, AIRLOCK CONFIG)
Temp stow EMUs in Middeck.
Will install on FD12.
Ref. MSG 142
Ref. Transfer List: Items 702,712,713,715
~
ISS A/L TOOL STOW
Ref. MSG 139
Ref. MSG 146
Notes
3-121
ROBI
NSON
PATR
ICK
BEHN
KEN
11 REPLANNED
STS-
130
FD
06:00
07:00
08:00
09:00
GMT
Date
02/18
(049)
20:00
21:00
22:00
23:00
00:00
MET
Day 009
WE
Z
T D R SD / N
O R B 1 5 6 1 5 7 1 5 8
S T S A T T ~ B I A S - X L V - Z V V R E B O O S T ~B I A S - X L V - Z V V
MS2
1.136 NODE 3 MTL PUMP PACKAGE ASSEMBLY(PPA)
LAUNCH BRACKET REMOVAL
(ASSY OPS, ACT&C/O)
~1.154 OGS RACK TRANSFER LAB TO NODE 3
Ref. MSG 144, Steps 1-6
EXERCISE
~
TRANSFER OPS
Ref. Transfer List & MSG 138
MS3
~POST EVA RECONFIG AND TRANSFER TO SHUTTLE
(EVA, AIRLOCK CONFIG)
Temp stow EMUs in Middeck.
Will install on FD12.
Ref. MSG 142
Ref. Transfer List: Items 702,712,713,715
ISS A/L TOOL STOW
Ref. MSG 139
Ref. MSG 146
MS4
~POST EVA RECONFIG AND TRANSFER TO SHUTTLE
(EVA, AIRLOCK CONFIG)
Temp stow EMUs in Middeck.
Will install on FD12.
Ref. MSG 142
Ref. Transfer List: Items 702,712,713,715
ISS A/L TOOL STOW
Ref. MSG 139
Ref. MSG 146
Notes
12
FLT PLN/130/FLT
ZAMK
AVI
RTS
HIRE
11
CREW WAKE AT 10/11:30
REPLANNED
C N2 REPRESS USING P/L N2 VLVS
(ORB OPS, ECLS) on MCC GO,
perform Steps 8-13
MCC will TMBU S/W FDA in Step 13
Work the ()s for all steps performed
After Step 13 on MCC GO,
MO10W 14.7 CAB REG INLET SYS 2 vlv-OP
3-122
STS-
130
FD
10:00
11:00
12:00
13:00
GMT
Date
02/18
(049)
00:00
01:00
02:00
03:00
04:00
MET
Day 010
WE
Z
T D R S
~
~~
D / N
O R B 1 5 9 1 6 0 1 6 1
~ ~B I A S - X L V - Z V VS T S A T T
CDR
PRE-SLEEP ACTIVITY
(ORB OPS, CREW SYS)
FLIGHT DIRECTOR CONFERENCE
PRE-SLEEP ACTIVITY
(ORB OPS, CREW SYS) SLEEP
~
PRIVATE MEDICAL CONFERENCE
L9 PAYLOAD STATION A/G (two) - OFF
Perform via A/G2
CWC FILL (ORB OPS, CWC OPS)
Init Fill #7, Ref. MSG 027
~
CWC FILL (ORB OPS, CWC OPS)
Perform FILL TERMINATION
CWC TRANSFER
Transfer CWC to ISS
N2 REPRESS TERM (On MCC GO) C
PLT
PRE-SLEEP ACTIVITY
(ORB OPS, CREW SYS)
√ILLUMINATORS OFF - ALL
SLEEP
~
EXERCISE
~
MS1
PRE-SLEEP ACTIVITY
(ORB OPS, CREW SYS)
TRANSFER TAGUP
Coordinate with transfer counterpart
TRANSFER BRIEF
Call down status to MCC
SLEEP
~
TRANSFER OPS
Ref. Transfer List & MSG 138
~
Notes
3-122
ZAMK
AVI
RTS
HIRE
11
CREW WAKE AT 10/11:30
REPLANNED
C N2 REPRESS USING P/L N2 VLVS
(ORB OPS, ECLS) on MCC GO,
perform Steps 8-13
MCC will TMBU S/W FDA in Step 13
Work the ()s for all steps performed
After Step 13 on MCC GO,
MO10W 14.7 CAB REG INLET SYS 2 vlv-OP
STS-
130
FD
10:00
11:00
12:00
13:00
GMT
Date
02/18
(049)
00:00
01:00
02:00
03:00
04:00
MET
Day 010
WE
Z
T D R SD / N
O R B 1 5 9 1 6 0 1 6 1
S T S A T T ~ ~B I A S - X L V - Z V V
CDR
PRE-SLEEP ACTIVITY
(ORB OPS, CREW SYS)
FLIGHT DIRECTOR CONFERENCE
PRE-SLEEP ACTIVITY
(ORB OPS, CREW SYS)
~
SLEEP
PRIVATE MEDICAL CONFERENCE
L9 PAYLOAD STATION A/G (two) - OFF
Perform via A/G2
~CWC FILL (ORB OPS, CWC OPS)
Init Fill #7, Ref. MSG 027
CWC FILL (ORB OPS, CWC OPS)
Perform FILL TERMINATION
CWC TRANSFER
Transfer CWC to ISS
N2 REPRESS TERM (On MCC GO) C
PLT
PRE-SLEEP ACTIVITY
(ORB OPS, CREW SYS)
√ILLUMINATORS OFF - ALL
~
SLEEP
~
EXERCISE
MS1
PRE-SLEEP ACTIVITY
(ORB OPS, CREW SYS)
TRANSFER TAGUP
Coordinate with transfer counterpart
TRANSFER BRIEF
Call down status to MCC
~
SLEEP
~TRANSFER OPS
Ref. Transfer List & MSG 138
Notes
13
FLT PLN/130/FLT
ROBI
NSON
PATR
ICK
BEHN
KEN
11
CREW WAKE AT 10/11:30
REPLANNED
3-123
STS-
130
FD
10:00
11:00
12:00
13:00
GMT
Date
02/18
(049)
00:00
01:00
02:00
03:00
04:00
MET
Day 010
WE
Z
T D R S
~
~~
D / N
O R B 1 5 9 1 6 0 1 6 1
~ ~B I A S - X L V - Z V VS T S A T T
MS2
PRE-SLEEP ACTIVITY
(ORB OPS, CREW SYS) SLEEP
~
TRANSFER OPS
Ref. Transfer List & MSG 138
~
MS3
PRE-SLEEP ACTIVITY
(ORB OPS, CREW SYS) SLEEP
~
MS4
PRE-SLEEP ACTIVITY
(ORB OPS, CREW SYS)
GLACIER STATUS CHECK (ASSY OPS,CC)
SLEEP
~
Notes
3-123
ROBI
NSON
PATR
ICK
BEHN
KEN
11
CREW WAKE AT 10/11:30
REPLANNED
STS-
130
FD
10:00
11:00
12:00
13:00
GMT
Date
02/18
(049)
00:00
01:00
02:00
03:00
04:00
MET
Day 010
WE
Z
T D R SD / N
O R B 1 5 9 1 6 0 1 6 1
S T S A T T ~ ~B I A S - X L V - Z V V
MS2
PRE-SLEEP ACTIVITY
(ORB OPS, CREW SYS)
~
SLEEP
~TRANSFER OPS
Ref. Transfer List & MSG 138
MS3
PRE-SLEEP ACTIVITY
(ORB OPS, CREW SYS)
~
SLEEP
MS4
PRE-SLEEP ACTIVITY
(ORB OPS, CREW SYS)
GLACIER STATUS CHECK (ASSY OPS,CC)
~
SLEEP
Notes
14
MSG 135 - FD11 MISSION SUMMARY
1 2 3 4 5 6 7
Good morning Endeavour. Outstanding work yesterday with the EVA and opening the Cupola's view to the world. We're looking forward to a great day today. YOUR CURRENT ORBIT IS: 188 X 180 NM NOTAMS: TWO CHANGES (DELETED ESN AND ADDED DOV) 8
9 10 11 12 13 14 15 16 17 18 19 20 21
EDW - TEMP RWY IN USE. PERM RWY CLOSED FOR CONSTRUCTION. EDW - LAKEBED RWYS RED. NOR - LAKEBED RWYS USABLE. DRYING OUT. FOK - CLOSED. WAL- CLOSED. DOV - RWY 32 RWY END LIGHTS OUT OF SERVICE. ZZA - ARRESTING NET INSTALLED 40M FROM END OF RWY 30L. GUA - RWY 06L/24R RWY END LIGHTS OUT OF SERVICE. PTN - CLOSED FOR RUNWAY CONSTRUCTION. IKF - NOT USABLE. NO AGREEMENT. BEN - NOT RECOMMENDED/NOT SUPPORTED.
NEXT 2 PLS OPPORTUNITIES: 22
23 24 25 26 27
EDT22R ORB 157 – 9/21:48 SKC 7 240/3P5 EDT22R ORB 172 –10/20:35 BKN200 7 230/8P12 OMS TANK FAIL CAPABILITY: 28
29 30 31 32
L OMS FAILS: NO R OMS FAILS: NO LEAKING OMS PRPLT BURN: 33
34 35 36 37
L OMS LEAK: ALWAYS BURN RETROGRADE R OMS LEAK: ALWAYS BURN RETROGRADE OMS QUANTITIES(%) 38
39 40 41 42 43 44 45 46 47 48 49 50 51
L OMS OX = 30.2 R OMS OX = 31.4 FU = 29.9 FU = 31.2 Subtract interconnect counter for current OMS quantities.
END OF PAGE 1 OF 2, MSG 135 15
MSG 135 - FD11 MISSION SUMMARY
END OF PAGE 2 OF 2, MSG 135
1 DELTA V AVAILABLE: 2
3 4
OMS 322 FPS ARCS (TOTAL ABOVE QTY1) 40 FPS 5
6 7 8 9
10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51
TOTAL IN THE AFT 362 FPS ARCS (TOTAL ABOVE QTY2) 74 FPS FRCS (ABOVE QTY 1) 12 FPS AFT QTY 1 75 % AFT QTY 2 37 % THERE ARE NO FAILURE/IMPACT/WORK AROUNDS FOR TODAY.
16
22-0
756
(MS
G 1
37) –
Sto
wag
e Lo
catio
ns fo
r FD
11
(GM
T 04
9)
Pag
e 1
of 2
1 P
age
1 of
21,
22-
0756
(MS
G 1
37)
Con
tent
s:
1
Tim
elin
e Pr
oced
ures
: 2
MY
CO
-ISS
SAM
PLE-
CLC
T 3
MY
CO
-STS
-SA
MP
LE C
LCT
4
MY
CO
-20A
-ME
LFI I
NS
5
LIO
H-C
AN
-RE
LOC
ATE
6
TOC
A R
MV
7
CE
VIS
-H/W
-RM
V
8
CE
VIS
-H/W
-INST
L 9
**W
RS
DE
MA
TES
10
WR
S 1
RA
CK
XFE
R
11
WR
S 2
RA
CK
XFE
R
12
**W
RS
1 R
K U
MB
IL M
ATE
13
WR
S 2
RK
UM
BIL
MA
TE
14
**C
UP
CO
RN
ER
PAN
EL T
/S
15
NO
D3D
5-R
AC
K-P
RE
P
16
CR
AB R
MV
/STO
W
17
T2-T
OO
L-FI
T-C
HEC
K 18
WH
C D
EM
ATE
19
WH
C R
AC
K X
FER
20
WH
C M
ATE
21
**O
GS
RA
CK
UM
BIL
DM
ATE
22
**O
GS
RA
CK
XFE
R
23
OG
S R
AC
K U
MB
IL M
ATE
24
EH
S-R
AM
-DE
PLO
Y
25
**R
WS
-BU
MP
ER
-INS
TL
26
**R
WS
-BO
OT-
INST
ALL
27
N3-
WH
C-H
YG-C
VR
-INS
TL
28
OG
S-Q
D-C
NC
T 29
OG
S-H
2 S
NS
R-C
NC
T 30
N3-
UIP
-CLS
OU
T-IN
STL
31
** M
T-PP
A L
R-R
MV
32
FIR
EPO
RT-
UP
DA
TE
33
ESA
Tim
elin
e Pr
oced
ures
: 34
17
22-0
756
(MS
G 1
37) –
Sto
wag
e Lo
catio
ns fo
r FD
11
(GM
T 04
9)
Pag
e 2
of 2
1 P
age
2 of
21,
22-
0756
(MS
G 1
37)
Non
e 1
JAXA
Tim
elin
e Pr
oced
ures
: 2
Non
e 3
Task
list P
roce
dure
s:
4
BC
AT3
-CR
YST
AL-
CH
EC
K
5
WH
C-K
TO-R
EPLA
CE
6
WH
C-ЕДВ-У-
R&
R
7
PW
D-B
EV
AD
PTR
-R&R
8
JAXA
Tas
klis
t Pro
cedu
res:
9
Non
e 10
ESA
Tas
klis
t Pro
cedu
res:
11
Non
e 12
13
14
15
16
Tim
elin
e Pr
oced
ures
: 17
18
MYC
O-IS
S SA
MPL
E-C
LCT
MYC
O-S
TS-S
AM
PLE
CLC
T
MYC
O-2
0A-M
ELFI
INS
2.00
3 M
YCO
BO
DY
SAM
PLE
CO
LLEC
TIO
N
2.01
4 M
ELFI
Inse
rtio
n of
Sam
ple
Into
Box
Mod
ule-
IMS
Gen
eric
Ty
pe: S
tand
ard
#
LOC
ATI
ON
IT
EM N
AM
E P/
N
S/N
B
/C
Not
es
1 LA
B1S
2_B
1 D
ewar
AS
E P
ouch
03
298
03J
ME
FDA
P03
J
2
Whi
te G
love
s 03
291-
1 A
ny
Any
3 LA
B1S
2 (a
t ME
LFI 2
) C
oldp
late
/Wire
way
Cov
er
0300
0 -
-
4 Te
mp
Stow
ed
FD10
Myc
o K
it [Q
TY:3
] M
K-1
00
1 00
2 00
3
MY
C01
001N
M
YC
0100
2N
MY
C01
003N
Soi
chi
TJ
Kay
18
22-0
756
(MS
G 1
37) –
Sto
wag
e Lo
catio
ns fo
r FD
11
(GM
T 04
9)
Pag
e 3
of 2
1 P
age
3 of
21,
22-
0756
(MS
G 1
37)
Type
: Res
tow
IM
S P
lan:
No
5 LA
B1S
2 M
ELFI
-2
Dew
ar 4
, Tra
y B,
Sec
3-4
.
MY
CO
Kit
MK
-1
001
MY
C01
001N
Soi
chi
6
MY
CO
Kit
[QTY
:2]
MK
-1
002
003
MY
C01
002N
M
YC
0100
3N
TJ
Kay
1
LIO
H-C
AN
-REL
OC
ATE
22
-074
5 LI
OH
CA
N R
ELO
CA
TE
Type
: Sta
ndar
d
# LO
CA
TIO
N
ITEM
NA
ME
P/N
S/
N
B/C
N
otes
1
NO
D1S
4_D
2 Li
OH
M
C62
1-00
08-
0409
/SV
7555
10-4
An
y ST
S-
130/
20A
C
an
- R
EPO
RT
Can
#
Type
: Res
tow
2 N
OD
1P4_
B2
1.0
CTB
: Pos
t-Fi
re K
it, 1
of 2
, S
/N 1
009,
B/C
00
2303
J
LiO
H
MC
621-
0008
-04
09/S
V75
5510
-4
- -
2
TOC
A R
MV
22-0
586
Tota
l Org
anic
Car
bon
Ana
lyze
r: T
OC
A –
Uni
nsta
ll fr
om W
ater
Rec
over
y Sy
stem
2 (W
RS2
) Rac
k Ty
pe: R
esto
w
#
LOC
ATI
ON
IT
EM N
AM
E P/
N
S/N
B
/C
Not
es
1 N
OD
3F1
TOC
A
SE
G52
1013
88-3
01
1001
2T
CA
14J
2
TOC
A W
ater
Sam
ple
Hos
e
SE
G52
1017
27-3
01
1001
00
1006
49J
3
LAB
TO
CA
N2
Hos
e 68
3-63
488-
1 00
0001
00
0941
63H
3
4
5
19
22-0
756
(MS
G 1
37) –
Sto
wag
e Lo
catio
ns fo
r FD
11
(GM
T 04
9)
Pag
e 4
of 2
1 P
age
4 of
21,
22-
0756
(MS
G 1
37)
CEV
IS-H
/W-R
MV
CEV
IS-H
/W-IN
STL
2.1.
885
CEV
IS -
DIS
CO
NN
ECTI
NG
CEV
IS F
RO
M R
AC
K
2.1.
800
CEV
IS-C
onne
ctin
g C
EVIS
to R
ack
Type
: Sta
ndar
d
# LO
CA
TIO
N
ITEM
NA
ME
P/N
S/
N
B/C
N
otes
1
LAB
1P3_
D2
CE
VIS
Acc
esso
ry K
it S
EG
4611
6009
-301
-
CH
CC
ES02
J
2 C
EV
IS Is
olat
or K
it S
EG
4611
6012
-301
-
0001
5648
J
1
2
3
4
**W
RS
DEM
ATE
S W
RS
1 R
AC
K X
FER
W
RS
2 R
AC
K X
FER
**
WR
S 1
RK
UM
BIL
MA
TE
WR
S 2
RK
UM
BIL
MA
TE
1.15
0 W
RS-
1 &
WR
S-2
RA
CK
TR
AN
SFER
LA
B T
O N
OD
3 Ty
pe: S
tand
ard
#
LOC
ATI
ON
IT
EM N
AM
E P/
N
S/N
B
/C
Not
es
1 C
OL1
F3
Em
pty
3.0
CTB
S
EG
3311
1840
-303
A
ny
Any
R
epor
t S/N
to
MC
C-H
2
LAB
1D5
0.5
CTB
: WR
S
Cap
s&P
lugs
P
otab
le W
ater
R
efill
Pur
ge
Adap
, S/N
13
79, B
/C
CTB
0028
4J
Zipl
ock:
WR
S P
wr/D
ata
Cap
s -
- -
3
Zipl
ock:
WR
S P
roce
ss W
ater
C
aps/
Plug
s -
- -
4 Zi
ploc
k: W
RS
2 W
aste
Wat
er
Cap
s/Pl
ugs
- -
-
5 Zi
ploc
k: W
RS
1 O
2 C
aps/
Plu
gs
- -
-
6 Zi
ploc
k: W
RS
1 P
otab
le W
ater
C
aps/
Plug
s -
- -
7 Zi
ploc
k: W
RS
TC
S C
aps/
Plu
gs
- -
-
8
QD
Plu
g [Q
TY: 4
] 68
3-16
348-
813
- -
20
22-0
756
(MS
G 1
37) –
Sto
wag
e Lo
catio
ns fo
r FD
11
(GM
T 04
9)
Pag
e 5
of 2
1 P
age
5 of
21,
22-
0756
(MS
G 1
37)
9 Zi
ploc
k "Q
D C
aps
and
Plu
gs F
or
EC
LSS
Urin
e P
roce
ssor
Ass
y M
aint
enan
ce O
nly
(for t
ox le
vel 2
flui
d lin
es)"
- -
-
10
LAB
1P2
0.5
CTB
, S/N
12
21, B
/C
0104
02J
Reg
en E
CLS
S T
ox-2
PP
E K
it S
EG
4210
3702
-302
10
02
CH
CC
PK02
J
11
S
urgi
cal M
ask
503R
-
-
12
S
afet
y G
oggl
es
SS
104M
-
-
13
S
ilver
Shi
eld
Glo
ves
8210
-
-
14
NO
D1D
4 6”
Lon
g, 3
/8” H
ex H
ead,
3/8
” Driv
e
- -
15
5/
16” S
ocke
t, 1/
4” D
rive
-
-
16
(40-
200
in-lb
s) T
rq W
renc
h, 3
/8” D
rive
17
5/32
” Hex
Hea
d, 3
/8” D
rive
18
Preg
athe
red
Tool
set
“Jef
f” o
r “TV
”
9/16
” Soc
ket,
3/8”
Driv
e
19
Rat
chet
, 1/4
” Driv
e
20
A
djus
tabl
e Jo
int P
liers
, Stra
ight
Jaw
21
R
atch
et, 3
/8” D
rive
22
Wire
Cut
ters
23
S
tatic
Wris
t Tet
her
Type
: Res
tow
24
Tem
p St
ow
NO
D3
3.0
CTB
: WR
S a
nd O
GS
Lab
Mod
Kit
Jum
pers
S
EG
3311
1840
-303
-
-
25
Zipl
ock:
WR
S P
wr/D
ata
Cap
s -
- -
REP
OR
T Q
TY
left
in b
ag
26
Zipl
ock:
WR
S P
roce
ss W
ater
C
aps/
Plu
gs
- -
- R
EPO
RT
QTY
le
ft in
bag
27
Zi
ploc
k: W
RS
2 W
aste
Wat
er
Cap
s/P
lugs
-
- -
REP
OR
T Q
TY
left
in b
ag
28
Zipl
ock:
WR
S1
O2
Cap
s/P
lugs
-
- -
REP
OR
T Q
TY
left
in b
ag
29
Zipl
ock:
WR
S1
Pot
able
Wat
er
Cap
s/P
lugs
-
- -
REP
OR
T Q
TY
left
in b
ag
21
22-0
756
(MS
G 1
37) –
Sto
wag
e Lo
catio
ns fo
r FD
11
(GM
T 04
9)
Pag
e 6
of 2
1 P
age
6 of
21,
22-
0756
(MS
G 1
37)
30
Zipl
ock:
WR
S T
CS
Cap
s/P
lugs
-
- -
REP
OR
T Q
TY
left
in b
ag
31
Tem
pora
ry O
GS
/WR
S-2
Rac
k P
ower
Jum
per (
W51
24)
683-
9512
4-1
0000
01
0005
8643
H
32
WR
S2
- WR
S1
120V
Pw
r Jum
per
(W51
30)
683-
9513
0-1
0000
01
0005
6685
H
33
WR
S1
J6 -
WR
S2
J7 P
wr/D
ata
Jum
per (
W51
31)
683-
9513
1-1
0000
01
0005
6686
H
34
WR
S1
J7 -
WR
S2
J8 P
wr/D
ata
Jum
per (
W51
32)
683-
9513
2-1
0000
01
0005
6687
H
35
WR
S-1
J8
- WR
S-2
J9 D
ata
Jum
per (
W51
33)
683-
9513
3-1
0000
01
0005
6643
H
36
WR
S-2
Rac
k 15
53A
Jum
per
(W51
27)
683-
9512
7-1
0000
01
0005
6683
H
37
WR
S-2
Rac
k 15
53B
Jum
per
(W51
28)
683-
9512
8-1
0000
01
0005
6684
H
38
WR
S-2
Rac
k D
ata
Jum
per
(W51
29)
683-
9512
9-1
0000
01
0005
6642
H
39
WR
S-1
Rac
k D
ata
Cab
le
(W51
20)
683-
9512
0-1
0000
01
0005
6677
H
40
WR
S-1
Rac
k 15
53A
Jum
per
(W51
25)
683-
9512
5-1
0000
01
0005
6640
H
41
WR
S-1
Rac
k 15
53B
Jum
per
(W51
26)
683-
9512
6-1
0000
01
0005
6641
H
42
WR
S P
roce
ss W
ater
A J
umpe
r 68
3-63
461-
15
- -
43
W
RS
Pro
cess
Wat
er B
Jum
per
683-
6346
1-16
-
-
44
WR
S P
roce
ss W
ater
C J
umpe
r 68
3-63
461-
17
- -
45
WR
S P
roce
ss W
ater
D J
umpe
r 68
3-63
461-
18
- -
46
W
RS
-2 W
aste
Wat
er J
umpe
r 68
3-63
461-
14
0000
01
0006
0108
H
47
W
RS
-1 M
TL R
etur
n Ju
mpe
r 68
3-63
495-
1 00
0001
00
0601
03H
48
WR
S-1
MTL
Sup
ply
Jum
per
683-
6346
1-10
00
0001
00
0601
02H
49
WR
S-2
MTL
Ret
urn
Jum
per
683-
6346
1-13
00
0001
00
0601
07H
22
22-0
756
(MS
G 1
37) –
Sto
wag
e Lo
catio
ns fo
r FD
11
(GM
T 04
9)
Pag
e 7
of 2
1 P
age
7 of
21,
22-
0756
(MS
G 1
37)
50
WR
S-2
MTL
Sup
ply
Jum
per
683-
6346
1-12
00
0001
00
0601
06H
51
WR
S-1
Pot
able
Wat
er J
umpe
r 68
3-63
461-
11
0000
01
0006
0104
H
52
W
RS
Jum
per S
uppo
rt B
rack
et
683-
6440
0-1
0000
01
0006
0127
H
53
W
RS
Clo
seou
t Ass
embl
y - S
eat
Trac
k B
rack
et [Q
ty 2
] 68
3-64
400-
3 00
0001
00
0707
94H
1
2
**C
UP
CO
RN
ER P
AN
EL T
/S
22-0
765
CU
POLA
CO
RN
ER P
AN
EL IN
TER
FER
ENC
E W
OR
KA
RO
UN
D
Type
: Sta
ndar
d
# LO
CA
TIO
N
ITEM
NA
ME
P/N
S/
N
B/C
N
otes
1
Tem
p St
ow
NO
D3A
2 C
orne
r Pan
el [Q
TY: 1
] 12
10C
U31
1-40
3 -
-
2 C
orne
r Pan
el [Q
TY: 2
] 12
10C
U32
3-40
3 -
-
3 C
orne
r Pan
el [Q
TY: 1
] 12
10C
U32
7-40
3 -
-
4 N
OD
1D4_
G1
1.0
CTB
, S/N
10
96, B
/C
0040
90J
Scr
ew E
xtra
ctor
Mas
ter K
it S
JG33
1165
81-3
01
1002
00
0425
33J
5
1
/8” C
obal
t Dril
l Bit
SJG
3311
5397
-504
-
-
6
5/1
6" C
obal
t Dril
l Bit
S
JG33
1153
97-5
01
- -
7 N
OD
1D4
#2 P
hilli
ps H
ead
Driv
er, 3
/8” D
rive
- -
- 8
6" L
ong,
3/1
6" B
all T
ip H
ex H
ead,
3/8
" D
rive
- -
-
9 La
rge
File
Set
-
- -
10
C
ente
r Pun
ch
- -
-
11
Dea
d B
low
Bal
lpee
n H
amm
er
- -
-
12
5/16
” Hex
Hea
d, 3
/8” D
rive
- -
-
13
Preg
athe
red
Tool
set
“Jef
f” o
r “TV
”
3/16
" Hex
Hea
d, 1
/4" D
rive
- -
-
14
Rat
chet
, 1/4
" Driv
e -
- -
15
R
atch
et, 3
/8" D
rive
- -
-
16
1/4”
to 3
/8” A
dapt
er
- -
-
17
Driv
er H
andl
e, 1
/4" D
rive
- -
-
18
5/32
" Hex
Hea
d, 1
/4" D
rive
- -
-
23
22-0
756
(MS
G 1
37) –
Sto
wag
e Lo
catio
ns fo
r FD
11
(GM
T 04
9)
Pag
e 8
of 2
1 P
age
8 of
21,
22-
0756
(MS
G 1
37)
19
3/8"
Soc
ket,
1/4"
Driv
e -
- -
20
4"
Ext
, 1/4
" Driv
e -
- -
21
4"
Com
mon
Tip
Scr
ewdr
iver
-
- -
Ty
pe: R
esto
w
22
N
OD
1P2
3.0
CTB
: N
ode
3 V
estib
ule
Out
fittin
g ki
t (V
OK)
, S/N
10
48, B
/C
0042
33J
0.5
CTB
: NO
D3
Uni
nsta
lled
Har
dwar
e S
EG
3311
1836
-303
10
65
0039
47J
23
Zip
lock
: “N
OD
3-C
upol
a A
lignm
ent
G
uide
s”
- -
-
24
A
lignm
ent G
uide
s
- -
-
25
Z
iplo
ck: “
NO
D3
Nad
ir R
TLs
” -
- -
26
RTL
s -
- -
27
Zip
lock
: “N
OD
3-C
upol
a C
aptu
re
L
atch
Ass
embl
ies”
-
- -
28
C
LA
- -
-
29
F
aste
ners
-
- -
30
Zip
lock
: “N
OD
3-C
upol
a V
estib
ule
Clo
seou
t Bra
cket
s”
- -
-
31
C
lose
out B
rack
ets
- -
-
32
P
-Cla
mp
- -
-
33
F
aste
ners
-
- -
34
Zip
lock
: “N
OD
3-C
upol
a V
estib
ule
P-C
lam
ps”.
- -
-
35
P
-Cla
mps
-
- -
36
Zip
lock
: “N
OD
3 N
AD
IR C
ente
r Dis
k
Cov
er S
tand
off B
rack
et --
Loo
se
Par
ts”
- -
-
37
C
ente
r Dis
k C
over
Sta
ndof
f
Bra
cket
-
- -
1
2
3
4
24
22-0
756
(MS
G 1
37) –
Sto
wag
e Lo
catio
ns fo
r FD
11
(GM
T 04
9)
Pag
e 9
of 2
1 P
age
9 of
21,
22-
0756
(MS
G 1
37)
NO
D3D
5-R
AC
K-P
REP
1.
142
PREP
AR
E N
OD
E 3
FOR
RA
CK
INST
ALL
ATI
ON
ON
20A
Ty
pe: S
tand
ard
#
LOC
ATI
ON
IT
EM N
AM
E P/
N
S/N
B
/C
Not
es
1 C
OL1
O4_
B2
0.5
CTB
: KB
AR/A
RIS
U
MB
ILIC
ALS
, S
/N 1
096,
B/C
00
6545
J
Zipl
ock
w/ K
-Bar
, Lef
t ite
ms
- -
-
2 K
-BA
R C
aptu
re F
ittin
g, L
eft
683-
6220
1-27
A
ny
- R
epor
t S/N
to
MC
C-H
3
Zipl
ock
w/ K
-Bar
, Rig
ht it
ems
- -
-
4 K
-BA
R C
aptu
re F
ittin
g, R
ight
68
3-62
201-
28
Any
-
Rep
ort S
/N to
M
CC
-H
5 N
OD
1D4
5/32
” Hex
Hea
d, 3
/8” D
rive
- -
-
6 (1
0-50
in-lb
s) T
rq W
renc
h, 1
/4” D
rive
- -
-
7 Pr
egat
here
d To
olse
t “J
eff”
or “
TV”
Rat
chet
, 1/4
” Driv
e -
- -
1
CR
AB
RM
V/ST
OW
2.
1.88
5 C
EVIS
- D
ISC
ON
NEC
TIN
G C
EVIS
FR
OM
RA
CK
Ty
pe: R
esto
w
#
LOC
ATI
ON
IT
EM N
AM
E P/
N
S/N
B
/C
Not
es
1 D
eplo
y
Cre
w P
ref
CE
VIS
Rac
k A
ttach
men
t Bra
cket
s [Q
TY: 4
] 68
3-99
542
- -
Can
be
used
as
crew
rest
rain
t and
m
obili
ty a
ids
as
desi
red.
2
T2-T
OO
L-FI
T-C
HEC
K
22-0
700
TREA
DM
ILL
2 –S
NU
BB
ER A
RM
FA
STEN
ER T
OO
L FI
T C
HEC
K
Type
: Sta
ndar
d
# LO
CA
TIO
N
ITEM
NA
ME
P/N
S/
N
B/C
N
otes
1
NO
D1D
4 3/
8” L
-Wre
nch
SK
G33
1175
62-7
96
- -
3
4
25
22-0
756
(MS
G 1
37) –
Sto
wag
e Lo
catio
ns fo
r FD
11
(GM
T 04
9)
Pag
e 10
of 2
1 P
age
10 o
f 21,
22-
0756
(MS
G 1
37)
1
2
3
WH
C D
EMA
TE
WH
C R
AC
K X
FER
W
HC
MA
TE
1.14
6 W
HC
Rac
k Tr
ansf
er -
LAB
1P2
to N
OD
3F4
1.33
3 W
HC
RA
CK
UM
BIL
ICA
L M
ATE
Ty
pe: S
tand
ard
#
LOC
ATI
ON
IT
EM N
AM
E P/
N
S/N
B
/C
Not
es
1 LA
B1P
2 0.
5 C
TB, S
/N
1221
, B/C
01
0402
J
Reg
en E
CLS
S T
ox-2
PP
E K
it S
EG
4210
3702
-302
10
02
CH
CC
PK02
J
2
Sur
gica
l Mas
k 50
3R
- -
3
S
afet
y G
oggl
es
SS
104M
-
-
4
Silv
er S
hiel
d G
love
s 82
10
- -
5
LAB
1P2
W
HC
Rac
k U
IP
Zipl
ock
“WH
C U
rine
Jum
per B
ag”
- -
-
6 N
OD
3F1
2.0
CTB
: IN
STA
LLAT
ION
H
/W 1
, S/N
10
92, B
/C
0106
80J
NO
D3
WH
C F
lush
Wat
er A
dapt
er M
od
Kit
683-
9939
6-1
0000
01
-
7
NO
D3
WH
C F
lush
Wat
er
A
dapt
er
683-
9939
5-1
0000
01
-
8
IM
S L
abel
68
3-99
224-
10
- -
9
4
" Tef
lon
Tape
C
HR
-C
- -
10
N
OD
1D4
(40-
200
in-lb
s) T
rq W
renc
h, 3
/8" D
rive
SE
G33
1172
89-3
02
M21
3569
-
11
6"
Lon
g, 3
/8" H
ex H
ead
Driv
er, 3
/8"
Driv
e S
KG
3311
7562
-751
-
-
12
5" L
ong,
3/8
" Bal
l Tip
Hex
Hea
d, 3
/8"
Driv
e S
EG
3310
9848
-309
-
-
13
Preg
athe
red
Tool
set
“Jef
f” o
r “TV
”
9/16
" Soc
ket,
3/8"
Driv
e S
KG
3311
7562
-731
-
-
14
Rat
chet
, 3/8
" Driv
e S
KG
3311
7562
-938
-
-
15
Wire
Cut
ters
S
KG
3311
7562
-926
-
-
16
Adj
usta
ble
Join
t Plie
rs, S
traig
ht J
aw
SK
G33
1175
62-9
45
- -
17
S
tatic
Wris
t Tet
her
SK
G33
1175
62-3
35
- -
26
22-0
756
(MS
G 1
37) –
Sto
wag
e Lo
catio
ns fo
r FD
11
(GM
T 04
9)
Pag
e 11
of 2
1 P
age
11 o
f 21,
22-
0756
(MS
G 1
37)
Type
: Res
tow
18
CO
L1O
4_B
2 0.
5 C
TB:
KBAR
/AR
IS
UM
BIL
ICA
LS,
S/N
109
6, B
/C
0065
45J
K-B
AR
Ass
y, L
eft
683-
6220
1-33
-
- R
epor
t S/N
to
MC
C-H
19
K
-BA
R A
ssy,
Rig
ht
683-
6220
1-34
-
- R
epor
t S/N
to
MC
C-H
20
LAB
1P2
Sta
ndof
f Are
a W
HC
Urin
e Ju
mpe
r 68
3-63
461-
25
0000
01
0008
5696
H
Rou
ted
thro
ugh
stan
doff.
Rem
ains
in
sta
ndof
f. 21
W
HC
Flu
sh W
ater
Jum
per
683-
6346
1-26
00
0001
00
0856
95H
R
oute
d th
roug
h st
ando
ff.
Rem
oved
dur
ing
OG
S R
ack
Xfer
. 22
N
OD
3F4
UIP
Zi
ploc
k: W
HC
Pw
r/Dat
a C
aps
- -
-
23
Cap
s [Q
TY: 4
] -
- -
24
Zi
ploc
k: W
HC
Urin
e C
aps
- -
-
25
Cap
s [Q
TY: 2
] -
- -
26
Zi
ploc
k: W
HC
Pot
able
H2O
Cap
s -
- -
27
C
aps
[QTY
: 2]
- -
-
28
Tem
p St
ow
NO
D3
3.0
CTB
: WR
S a
nd O
GS
Lab
Mod
Kit
Jum
pers
S
EG
3311
1840
-303
-
- C
reat
ed d
urin
g W
RS
Rac
k X
fers
29
Zi
ploc
k La
bele
d “W
HC
Pow
er/D
ata
Jum
pers
” -
- -
Cre
ated
in W
HC
R
ACK
XFE
R
30
WH
C P
ower
Jum
per
683-
9913
4-1
0000
01
0008
5697
H
31
W
HC
Dat
a Ju
mpe
r 68
3-99
135-
1 00
0001
00
0856
98H
1
2
3
4
5
6
27
22-0
756
(MS
G 1
37) –
Sto
wag
e Lo
catio
ns fo
r FD
11
(GM
T 04
9)
Pag
e 12
of 2
1 P
age
12 o
f 21,
22-
0756
(MS
G 1
37)
**O
GS
RA
CK
UM
BIL
DM
ATE
**
OG
S R
AC
K X
FER
O
GS
RA
CK
UM
BIL
MA
TE
22-0
752
1.15
4 O
GS
RA
CK
TR
AN
SFER
LA
B1P
1 TO
NO
D3A
5 1.
325
OG
S U
MB
ILIC
AL
MA
TE
Type
: Sta
ndar
d
# LO
CA
TIO
N
ITEM
NA
ME
P/N
S/
N
B/C
N
otes
1
LAB
1P1
stow
age
area
in
side
rack
0.
5 C
TB: O
GS
H
ardw
are,
S/N
13
49, B
/C
0105
30J
Zipl
ock:
OG
S J
umpe
r Ele
ctric
al
Plu
gs
- -
-
2 Zi
ploc
k: O
GS
Jum
per F
luid
Plu
gs
- -
-
3 Zi
ploc
k: N
ode
3 M
isce
llane
ous
- -
-
4 W
HC
/OG
S P
otab
le W
ater
QD
Cap
s -
- -
5 Te
mp
stow
ed
NO
D3
3.0
CTB
: WR
S a
nd O
GS
Lab
Mod
K
it Ju
mpe
rs
SE
G33
1118
40-3
03
- -
Cre
ated
dur
ing
WR
S
Rac
k X
fers
6
OG
S W
aste
Wat
er J
umpe
r (A
CTE
X H
ose)
68
3-63
461-
7 00
0001
00
0600
99H
R
emov
ed d
urin
g O
GS
U
mbi
lical
Dem
ate
and
used
dur
ing
OG
S
Um
bilc
al m
ate
in N
ode
3.
7 N
OD
1D4
5/32
" Hex
Hea
d, 3
/8" D
rive
- -
-
8 5/
16" S
ocke
t, 1/
4" D
rive
- -
-
9 D
river
Han
dle,
3/8
” Driv
e -
- -
10
6”
Lon
g, 3
/8” H
ex H
ead,
3/8
” Driv
e -
- -
11
(5
-35
in-lb
s) T
rq D
river
, 1/4
" Driv
e -
- -
12
Pr
egat
here
d To
olse
t “J
eff”
or “
TV”
Rat
chet
, 3/8
" Driv
e -
- -
13
9/
16" S
ocke
t, 3/
8" D
rive
- -
-
14
Rat
chet
, 1/4
" Driv
e -
- -
15
6"
Ext
, 1/4
" Driv
e -
- -
16
W
ire C
utte
rs
- -
-
17
Adj
usta
ble
Join
t Plie
rs, S
traig
ht J
aw
- -
-
18
Sta
tic W
rist T
ethe
r -
- -
28
22-0
756
(MS
G 1
37) –
Sto
wag
e Lo
catio
ns fo
r FD
11
(GM
T 04
9)
Pag
e 13
of 2
1 P
age
13 o
f 21,
22-
0756
(MS
G 1
37)
Type
: Res
tow
19
JL
P1S1
W
ater
Del
iver
y O
RU
, OG
S
Feed
wat
er
Adap
ter H
ose
OG
S F
eed
Wat
er J
umpe
r 68
3-63
461-
8 00
0001
00
0601
00H
O
GS
Fee
d W
ater
Ju
mpe
r get
s m
ated
to
the
WD
S in
ste
p 16
.4 o
f th
e tra
nsfe
r.
20
NO
D3O
1 3.
0 C
TB: W
RS
and
OG
S L
ab M
od
Kit
Jum
pers
S
EG
3311
1840
-303
-
- C
reat
ed d
urin
g W
RS
R
ack
Xfe
rs
21
WH
C F
lush
Wat
er J
umpe
r 68
3-63
461-
26
0000
01
0008
5695
H
22
O
GS
Was
te W
ater
Jum
per
(Gre
en F
lex
Hos
e)
683-
6346
1-7
0000
01
0006
0099
H
23
OG
S R
ack
Dat
a Ju
mpe
r 68
3-95
136-
1 00
0001
00
0566
90H
24
OG
S R
ack
Pri
Pw
r Jum
per
683-
9513
4-1
0000
01
0005
6688
H
25
O
GS
Rac
k S
ec P
wr J
umpe
r 68
3-95
135-
1 00
0001
00
0566
89H
26
OG
S M
TL S
uppl
y Ju
mpe
r 68
3-63
461-
4 00
0001
00
0600
96H
27
OG
S M
TL R
etur
n Ju
mpe
r 68
3-63
461-
5 00
0001
00
0600
97H
28
OG
S N
itrog
en J
umpe
r 68
3-63
461-
6 00
0001
00
0600
98H
29
OG
S H
2/N
2 V
ent J
umpe
r 68
3-63
461-
9 00
0001
00
0601
01H
30
NO
D3A
5 0.
5 C
TB: O
GS
H
ardw
are,
S/N
13
49, B
/C
0105
30J
Zipl
ock
Bag
: OG
S J
umpe
r Flu
id
Plu
gs
- -
-
31
Plu
gs
- -
- R
EPO
RT
QTY
32
Zi
ploc
k B
ag: O
GS
Jum
per E
lect
rical
P
lugs
-
- -
33
Plu
gs
- -
- R
EPO
RT
QTY
34
N
OD
1P2
3.0
CTB
: Nod
e 3
Ves
tibul
e O
utfit
ting
kit
(VO
K), S
/N
1048
, B/C
00
4233
J
0.5
CTB
: NO
D3
Uni
nsta
lled
Har
dwar
e S
EG
3311
1836
-303
10
65
0039
47J
35
Zipl
ock:
Nod
e 3
Mis
cella
neou
s -
- -
36
C
onne
ctor
Sup
port
Bra
cket
[Q
TY: 2
] -
- -
37
Fast
ener
s [Q
TY: 8
] -
- -
1
29
22-0
756
(MS
G 1
37) –
Sto
wag
e Lo
catio
ns fo
r FD
11
(GM
T 04
9)
Pag
e 14
of 2
1 P
age
14 o
f 21,
22-
0756
(MS
G 1
37)
1
2
3
EHS-
RA
M-D
EPLO
Y 22
-058
2 3.
119
RA
DIA
TIO
N A
REA
MO
NIT
OR
DO
SIM
ETER
S Ty
pe: S
tand
ard
IMS
Pla
n: N
o #
LOC
ATI
ON
IT
EM N
AM
E P/
N
S/N
B
/C
Not
es
1 LA
B1D
6 1.
0 C
TB:
CH
eCS
H
ardw
are,
S/N
11
66, B
/C
0041
60J
Rad
iatio
n A
rea
Mon
itor H
ardw
are
Zipl
ock
Bag
-
- -
2
Zip
lock
-
- -
3
R
adia
tion
Are
a M
onito
r [Q
TY:2
4]
SE
Z331
1151
9-31
3 23
56-2
379
- 24
blu
e m
onito
rs.
To b
e de
ploy
ed
per p
roce
dure
. 4
R
adia
tion
Are
a S
ubpa
ck A
ssy
SE
G46
1169
51-6
06
- -
Con
tain
s 2
subp
ack
assy
5
N
ew R
AM
Loc
atio
n S
ubpa
ck
[Q
TY:2
] S
EG
4611
6951
-605
-
EH
S00
013J
EH
S00
035J
E
ach
New
RA
M
Loca
tion
Sub
pack
co
ntai
ns o
ne N
ew
Rad
iatio
n A
rea
Mon
itor
6
Rad
iatio
n A
rea
Mon
itor
[Q
TY:2
] S
EZ3
3111
519-
313
2380
23
81
-
Type
: Res
tow
IM
S P
lan:
No
7 Tr
ansf
er L
ist
Ret
urn
Item
#7
26
Rad
iatio
n A
rea
Mon
itor H
ardw
are
Zipl
ock
Bag
-
- -
8
Rad
iatio
n A
rea
Mon
itor [
QTY
:25]
S
EZ
3311
1519
-313
22
91-2
315
- 25
whi
te
mon
itors
. C
olle
cted
from
va
rious
loca
tions
in
ISS
per
pr
oced
ure.
4
5
6
7
8
30
22-0
756
(MS
G 1
37) –
Sto
wag
e Lo
catio
ns fo
r FD
11
(GM
T 04
9)
Pag
e 15
of 2
1 P
age
15 o
f 21,
22-
0756
(MS
G 1
37)
**R
WS-
BU
MPE
R-IN
STL
1.17
6 R
WS
VID
EO M
ON
ITO
R O
RU
BU
MPE
R IN
STA
LLA
TIO
N
Type
: Sta
ndar
d
# LO
CA
TIO
N
ITEM
NA
ME
P/N
S/
N
B/C
N
otes
1
NO
D3A
2 2.
0 C
TB:
RW
S/C
RE
W
PR
EF,
S/N
10
87, B
/C
0106
75J
RW
S M
onito
r Bum
per K
it [Q
TY: 3
] 84
3442
-551
A
ny
- R
epor
t S/N
to
MC
C-H
2
Cor
ner B
umpe
r [Q
TY: 2
eac
h ki
t]
8428
36-5
51
- -
3
3” L
ong
“Loo
p” V
elcr
o
[QTY
: 2 e
ach
kit]
2538
251-
7002
-
-
4 1”
Squ
are
“Loo
p” V
elcr
o
[QTY
: 2 e
ach
kit]
2538
251-
7002
-
-
5 C
onne
ctor
Bum
per [
QTY
: 2 e
ach
kit]
8428
37-5
51
- -
1
**R
WS-
BO
OT-
INST
ALL
22
-063
8 7.
2.71
1 R
OTA
TIO
N H
AN
D C
ON
TRO
LLER
FA
BR
IC B
OO
T IN
STA
LLA
TIO
N
Type
: Sta
ndar
d
# LO
CA
TIO
N
ITEM
NA
ME
P/N
S/
N
B/C
N
otes
1
NO
D3A
2 2.
0 C
TB:
RW
S/C
RE
W
PR
EF,
S/N
10
87, B
/C
0106
75J
EM
C B
oot K
it 20
4215
-551
A
ny
- R
epor
t S/N
to
MC
C-H
2
Con
tact
Stri
p
2042
13-5
01
- -
3
Upp
er C
lam
p
2042
12-5
01
- -
4
Fabr
ic B
oot
20
4216
-501
-
-
5 Lo
wer
Cla
mp
20
4214
-501
-
-
6 N
OD
1D4
5/64
" Hex
Hea
d, 1
/4" D
rive
SK
G33
1175
62-7
37
- -
7
1/8"
Hex
Hea
d, 1
/4" D
rive
SK
G33
1175
62-7
40
- -
8
(10-
50 in
-lbs)
Trq
Wre
nch,
1/4
" Driv
e S
EG
3311
2395
-301
M
2064
22
-
9 S
tatic
Wris
t Tet
her
SK
G33
1175
62-3
35
- -
10
Pr
egat
here
d To
olse
t “J
eff”
or “
TV”
Driv
er H
andl
e, 1
/4" D
rive
SK
G33
1175
62-9
41
- -
2
31
22-0
756
(MS
G 1
37) –
Sto
wag
e Lo
catio
ns fo
r FD
11
(GM
T 04
9)
Pag
e 16
of 2
1 P
age
16 o
f 21,
22-
0756
(MS
G 1
37)
N3-
WH
C-H
YG-C
VR-IN
STL
22-0
750
WH
C N
ode
3 H
ygie
ne C
over
s In
stal
l Ty
pe: S
tand
ard
#
LOC
ATI
ON
IT
EM N
AM
E P/
N
S/N
B
/C
Not
es
1 JL
P1P2
_B1
ACУ
Pan
el C
over
S
K68
3-99
217-
10
- -
2
Fron
t Con
trol P
anel
Cov
er
SK
683-
9921
7-11
-
-
3 A
V3
Pow
er S
witc
h C
over
S
K68
3-99
217-
12
- -
Ty
pe: R
esto
w
4
JLP1
P2_B
1 Zi
ploc
k B
ag
- -
- R
emov
ed
Hyg
iene
Cov
ers
5
ACУ
Pan
el C
over
68
3-99
217-
4 -
BC
C00
098J
6
W
HC
Fro
nt P
anel
Cov
er
683-
9921
7-6
- -
7
AV
3 P
ower
Sw
itch
Cov
er
683-
9921
7-7
- B
CC
0010
0J
8
WH
C U
OP
Cov
er
683-
9921
7-8
- B
CC
0009
9J
9 Zi
ploc
k B
ag
- -
- Le
ft ov
er
mag
nets
from
co
ver i
nsta
ll 10
WH
C H
ygie
ne C
over
Mag
nets
-
- -
1
OG
S-Q
D-C
NC
T O
GS-
H2
SNSR
-CN
CT
1.91
2 O
GA
Act
ivat
ion
22-0
751
6.1.
901
HYD
RO
GEN
SEN
SOR
R&
R -
OG
S R
AC
K
Type
: Sta
ndar
d
# LO
CA
TIO
N
ITEM
NA
ME
P/N
S/
N
B/C
N
otes
1
NO
D1O
4_G
H
ydro
gen
Sen
sor O
RU
S
V82
6167
-1
1005
A
RS
OH
2S5M
2 N
OD
1D4
(40-
200
in-lb
) Trq
Wre
nch,
1/4
" Driv
e -
- -
3
Preg
athe
red
Tool
set
“Jef
f” o
r “TV
”
6" E
xt, 1
/4" D
rive
- -
-
4 3/
8" S
ocke
t, 1/
4" D
rive
- -
-
5 R
atch
et, 1
/4" D
rive
- -
-
6 S
tatic
Wris
t Tet
her
- -
-
Type
: Res
tow
7 N
OD
1O4_
G
Hyd
roge
n S
enso
r OR
U
SV
8261
67-1
10
03
AR
SO
H2S
5M
32
22-0
756
(MS
G 1
37) –
Sto
wag
e Lo
catio
ns fo
r FD
11
(GM
T 04
9)
Pag
e 17
of 2
1 P
age
17 o
f 21,
22-
0756
(MS
G 1
37)
1
N3-
UIP
-CLS
OU
T-IN
STL
22-0
749
NO
D3
UIP
CLO
SEO
UT
INST
ALL
ATI
ON
Ty
pe: S
tand
ard
#
LOC
ATI
ON
IT
EM N
AM
E P/
N
S/N
B
/C
Not
es
1 N
OD
1D2
Zipl
ock:
NO
D3
Rac
k C
loso
ut
- -
-
2 N
OD
3A5
OG
S R
ack
Clo
seou
t 96
M35
015-
1 00
1 -
3
NO
D3A
4 A
RS
Rac
k C
lose
out
96M
3501
6-1
001
-
4 N
OD
3D5
WR
S1
Rac
k C
lose
out
96M
3501
7-1
001
-
5 N
OD
3D4
WR
S2
Rac
k C
lose
out
96M
3501
8-1
001
-
2
3
4
5
6
** M
T-PP
A L
R-R
MV
1.13
6 N
OD
E 3
MTL
PU
MP
PAC
KA
GE
ASS
EMB
LY (P
PA) L
AU
NC
H B
RA
CK
ET R
EMO
VAL
Type
: Sta
ndar
d
# LO
CA
TIO
N
ITEM
NA
ME
P/N
S/
N
B/C
N
otes
1
NO
D1D
4 5/
16" C
ombi
natio
n W
renc
h S
KG
3311
7562
-328
-
-
2 5/
16" S
ocke
t, 1/
4" D
rive
SK
G33
1175
62-6
97
- -
3
1/2"
Soc
ket,
1/4"
Driv
e S
KG
3311
7562
-702
-
-
4 2"
Ext
, 1/4
" Driv
e S
KG
3311
7562
-763
-
-
5 10
" Ext
, 1/4
" Driv
e S
KG
3311
7562
-766
-
-
6 In
spec
tion
Mirr
or
SK
G33
1175
62-9
23
- -
7
Preg
athe
red
Tool
set
“Jef
f” o
r “TV
”
5/32
" Hex
Hea
d, 1
/4" D
rive
SK
G33
1175
62-7
42
- -
8
3/16
" Hex
Hea
d, 1
/4" D
rive
SK
G33
1175
62-7
43
- -
9
4" E
xt, 1
/4" D
rive
SK
G33
1175
62-7
64
- -
10
6"
Ext
, 1/4
" Driv
e S
KG
3311
7562
-765
-
-
11
Rat
chet
, 1/4
" Driv
e S
KG
3311
7562
-939
-
-
12
Driv
er H
andl
e, 1
/4" D
rive
SK
G33
1175
62-9
41
- -
33
22-0
756
(MS
G 1
37) –
Sto
wag
e Lo
catio
ns fo
r FD
11
(GM
T 04
9)
Pag
e 18
of 2
1 P
age
18 o
f 21,
22-
0756
(MS
G 1
37)
Type
: Res
tow
13
NO
D1P
2 3.
0 C
TB: N
ode
3 V
estib
ule
Out
fittin
g ki
t (V
OK)
, S/N
10
48, B
/C
0042
33J
0.5
CTB
: NO
D3
Uni
nsta
lled
Har
dwar
e S
EG
3311
1836
-303
10
65
0039
47J
14
Zi
ploc
k: N
ode
3 C
lose
out P
anel
La
unch
Bol
ts
- -
-
15
Laun
ch B
olts
[QTY
: 20]
-
- -
16
24
” X 2
4“ Z
iplo
ck
- -
- LA
BEL
“AV
M
Blo
ckin
g S
pace
rs”
17
U-S
hape
d A
VM B
lock
ing
Dev
ice
Spa
cer [
QTY
:2]
N2-
DR
-OH
B
01.2
1.20
.013
-
- B
rack
ets
18
Sm
all A
VM
Blo
ckin
g D
evic
e S
pace
r [Q
TY:2
] N
2-D
R-O
HB-
01.2
1.20
.012
-
-
19
Larg
e A
VM
Blo
ckin
g D
evic
e S
pace
r[ Q
TY:2
] N
2-D
R-O
HB-
01.2
1.20
.011
-
-
20
NO
D3D
1 S
hear
Fra
me
Ass
embl
y 17
40N
D20
5 -
-
21
Dia
gona
l Fra
me
Ass
embl
y 17
40N
D20
5 -
-
1
FIR
EPO
RT-
UPD
ATE
22
-076
0: F
irepo
rt L
abel
Upd
ates
Ty
pe: S
tand
ard
#
LOC
ATI
ON
IT
EM N
AM
E P/
N
S/N
B
/C
Not
es
1 N
OD
1D2
1.0
CTB
: IS
S H
W #
2, S
/N
1338
, B/C
C
TB00
004J
Zipl
ock:
Rac
k Fi
repo
rt La
bels
. Ins
tall
Onl
y A
FTE
R R
ack
Tran
sfer
-
- -
2
ESA
Tim
elin
e Pr
oced
ures
: 3
Non
e 4
5
JAXA
Tim
elin
e Pr
oced
ures
: 6
Non
e 7
8
9
34
22-0
756
(MS
G 1
37) –
Sto
wag
e Lo
catio
ns fo
r FD
11
(GM
T 04
9)
Pag
e 19
of 2
1 P
age
19 o
f 21,
22-
0756
(MS
G 1
37)
Task
list P
roce
dure
s:
1
2
BC
AT3
-CR
YSTA
L-C
HEC
K
2.03
4 B
CA
T-4
CR
YSTA
L C
HEC
K F
OR
SA
MPL
ES 8
,9, a
nd 1
0 Ty
pe: S
tand
ard
#
LOC
ATI
ON
IT
EM N
AM
E P/
N
S/N
B
/C
Not
es
1 LA
B1O
7 R
ack
Fron
t B
CA
T-3
Slow
Gro
wth
Sam
ple
Mod
ule
6704
1FS
M22
00
- 00
0304
26L
2 LA
B1O
4_J1
0.
5 C
TB B
CA
T S
/N 1
240,
B/C
01
0421
J
LED
Min
i Mag
light
60
107M
FA20
17
- 00
1052
56L
3
1.5V
Bat
tery
Siz
e A
A
528-
4135
0-3
- -
(if re
quire
d)
3
WH
C-K
TO-R
EPLA
CE
2.30
5 W
HC
[KTO
] R&
R
Type
: Sta
ndar
d
# LO
CA
TIO
N
ITEM
NA
ME
P/N
S/
N
B/C
N
otes
1
FGB
Pan
el 2
20
or
FGB
Flo
or
or
NO
D1O
2
Sol
id W
aste
Con
tain
er –
Bod
y (a
ka K
TO B
ody)
11Ф
615.
8720А
55-2
0 25
7 26
3 26
4 26
5 27
2 27
5 27
8 28
2 30
4 30
7 30
8 30
9 31
0 32
5
- 00
1127
22J
0011
2724
J 00
1127
35J
0011
6316
J 00
1163
13J
0011
6302
J 00
1163
11J
0011
2744
J 00
1127
38J
- 00
1127
46J
0011
2748
J 00
1127
36J
This
is th
e lis
t of a
vaila
ble
KTO
Bod
ies.
R
EPO
RT
S/N
and
B/C
2 S
olid
Was
te C
onta
iner
– L
id
(aka
KTO
Bot
tom
) 11Ф
615.
8720А
55-1
0 25
7 25
8 26
3
0009
8427
R
0009
8428
R
0011
2721
J
This
is th
e lis
t of a
vaila
ble
KTO
Lid
s.
REP
OR
T S/
N a
nd B
/C
35
22-0
756
(MS
G 1
37) –
Sto
wag
e Lo
catio
ns fo
r FD
11
(GM
T 04
9)
Pag
e 20
of 2
1 P
age
20 o
f 21,
22-
0756
(MS
G 1
37)
265
272
274
275
278
282
307
308
309
310
325
0011
2733
J 00
0984
72R
00
0984
74R
00
0984
75R
00
0984
38R
00
0984
42R
00
1127
37J
- 00
1127
45J
0011
2747
J -
3 LA
B1D
1 S
olid
Was
te C
onta
iner
– B
ody
(aka
KTO
Bod
y)
11Ф
615.
8720А
55-2
0 30
5 00
1127
30J
Pre
posi
tione
d fo
r Ins
tall
4 S
olid
Was
te C
onta
iner
– L
id
(aka
KTO
Bot
tom
) 11Ф
615.
8720А
55-1
0 27
6 00
0984
36R
5 N
OD
1D4
Rat
chet
, 1/4
" Driv
e S
KG
3311
7562
-939
-
-
6 10
mm
6 P
t Soc
ket,
1/4"
Driv
e S
KG
3311
7562
-657
-
-
7 (1
0-50
in-lb
s) T
rq W
renc
h, 1
/4"
Driv
e S
EG
3311
2395
-301
M
2064
22
-
Type
: Res
tow
8 LA
B1S
1 Te
SS
Sol
id W
aste
Con
tain
er –
Bod
y (a
ka K
TO B
ody)
11Ф
615.
8720А
55-2
0 -
- R
EPO
RT
S/N
and
B/C
9 S
olid
Was
te C
onta
iner
– L
id
(aka
KTO
Bot
tom
) 11Ф
615.
8720А
55-1
0 -
-
1
2
WH
C-ЕДВ
-У-R
&R
2.
302
WH
C ЕДВ
R&
R
Type
: Sta
ndar
d
# LO
CA
TIO
N
ITEM
NA
ME
P/N
S/
N
B/C
N
otes
1
LAB
1P2
0.5
CTB
S
/N 1
221,
B
/C 0
1040
2J
Reg
en E
CLS
S T
ox-2
PP
E K
IT
SE
G42
1037
02-3
02
1002
C
HC
CP
K02
J
2
S
afet
y G
oggl
es
1664
4-00
000
- -
3
Silv
er S
hiel
d G
love
s S
SG
/10
- -
4
Dus
t Mas
k 92
11
- -
36
22-0
756
(MS
G 1
37) –
Sto
wag
e Lo
catio
ns fo
r FD
11
(GM
T 04
9)
Pag
e 21
of 2
1 P
age
21 o
f 21,
22-
0756
(MS
G 1
37)
5 Te
mp
Stow
ed
near
LA
B1P
4
ЕДВ
Кры
шка
(ED
V L
id)
11Ф
615.
8711
-180А1
5-1
93
4 00
1163
25J
Em
ptie
d FD
10 (G
MT
48)
durin
g W
RS
-RFT
A-F
ILL
6
ЕДВ
Корпус
(ED
V B
ucke
t) 11Ф
615.
8711
-120А1
5-1
458
0011
6318
J
Type
: Res
tow
7 LA
B1S
1 ЕДВ
Кры
шка
(ED
V L
id)
11Ф
615.
8711
-180А1
5-1
93
1 00
1163
26J
8
ЕДВ
Корпус
(ED
V B
ucke
t) 11Ф
615.
8711
-120А1
5-1
455
0011
6319
J
1
PWD
-BEV
AD
PTR
-R&
R
22-0
309
PWD
Bev
erag
e A
dapt
er M
odifi
catio
n an
d In
stal
l Ty
pe: S
tand
ard
#
LOC
ATI
ON
IT
EM N
AM
E P/
N
S/N
B
/C
Not
es
1 LA
B1O
4_D
1 P
WD
Bev
erag
e A
dapt
er
SE
G33
1203
33-3
02
1002
-
2
NO
D1D
4 R
atch
et, 1
/4” D
rive
SK
G33
1175
62-9
39
- -
3
5/32
” Hex
Hea
d, 1
/4” D
rive
SK
G33
1175
62-7
42
- -
Ty
pe: R
esto
w
4
LAB
1O4_
D1
PW
D B
ever
age
Ada
pter
S
EG
3312
0333
-301
-
-
2
JAXA
Tas
klis
t Pro
cedu
res:
3
Non
e 4
5
ESA
Tas
klis
t Pro
cedu
res:
6
Non
e 7
8
9
10
11
12
13
14
15
16
17
18
19
37
MSG 138 (22-0757) - FD11 TRANSFER MESSAGE Page 1 of 2
1 2 3 4 5 6 7 8 9
10 11 12 13 14 15 16 17 18
Good morning Kay, Terry, & Steve, You are doing very well on transfer overall, and are now 74 percent complete! Today, there are several hours of transfer scheduled. There are no Transfer List change pages this morning. In your choreography, we have listed all the open items that can be completed today. If you complete all of these open items, you will only have the following open items for hatch closure day; the last 5 MLE bags, the water kit items and a few TBD late-additions. In order for us to finalize what TBD items will be transferred, we need to know how much space we have to work with. That is why we are asking the two questions below. The Transfer List Excel file, FD11_Transfer_List_STS130.xls, is located on the KFX machine in C:\OCA-up\transfer (and available via the PGSC homepage). For ISS, the Transfer List Excel file, FD11_Transfer_List_STS130.xls, is located in K:\OCA-up\transfer. Questions for Kay (please call down answers in your morning transfer time) 19
21
23 24 25
1. Please check Bag 406 (3.0 CTB) and let us know about how much space is still 20 available. Do you think an additional CTB would fit in this bag?
2. We are assessing the return of the Node 3 Closeout Panel Launch Bolts but space is 22 becoming limited. Would you be willing to use an empty food locker for returning these?
FD11 Choreography 26
27
28 29
30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49
• Bob: Transfer SAFER to shuttle per SAFER XFER activity (Item 714) • Nick & Bob: Transfer EVA items to shuttle per EVA RECONFIG & XFER activity
(Items 702, 712, 713, and 715) • XFER OPS:
o Item 740: Please verify this sample transfer is complete. You are looking for a Fluid Sample Bag with barcode ending in 96016J. We believe it is in Return Bag 404 (currently at NOD2D2), inside an ITCS Sample Return ziplock s/n 1007.
o These items may be done based on previous activities/calls, please verify: Old CDRA bed (Item 608) PWR CTB with foam (Item 725) (may have been done on FD04)
o Transfer returning RFTA (Item 732) o Per FD08 Transfer Brief, please check on whether item 611 is complete o Final stow of Pre-Treat tank, already on MDDK (Item 723) o Relocate entry garments (Item 38) o Transfer Return to Houston Imagery ziplock if ready (Item 727) o Continue other available return items (Item 404, 406, 610, 902)
Have a great day! - The 20A Transfer Team 50
Page 1 of 2, MSG 138 (22-0757) 38
MSG 138 (22-0757) - FD11 TRANSFER MESSAGE Page 2 of 2
Page 2 of 2, MSG 138 (22-0757)
1
2 3 4
20A Transfer Choreography
FD12 5
10
11
12 13 14 15 16
• Jeff: Transfer returning blood sample per BLD STW activity (Item 704) 6
• TJ: Transfer returning saliva sample per SLV STW activity (Item 728) 7
• Steve: Transfer AFD PCS per AFT PCS XFER activity (Item 39) 8
• Steve: Transfer SSC back to ISS during SSC RETURN activity (Item 804) 9
• Soichi: Transfer returning RAMs to shuttle per RAM INSTALL activity (Item 726) • Soichi: Transfer DCBs to shuttle per DCB-TRANSFER activity (Item 709 and 710) • XFER OPS:
o Complete water hardware transfers (Items 24, 25, 801, 729, and 735) o Transfer remaining 5 MLE bags (Items 408 and 701)
5 MLE Bag Plan (9 total) 17
18
19
20
21
22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50
• Bags B & H: to Columbus for temp stow (as needed) • Bag F: to Columbus permanently (return prepacked 5 MLE in its place) • Bags C, D & E: remain on shuttle for unpacking/repacking • Bag A: contains UPA DA, temp stow in JEM for FD04 • Bags G & I: handled via EVA procedures (G will be temp stowed in Node 1)
39
22-0
738
(MSG
139
)- ST
S-13
0/20
A E
VA R
esto
w 1
9A T
ool C
onfig
Page
1 o
f 14
Item
#
Loca
tion
Item
QTY
P/N
S/N
B/C
Fina
l Loc
atio
nN
otes
1M
WS
Bas
epla
te[M
odul
ar B
asep
late
Ass
embl
y]1
SE
G33
1104
90-3
0310
0100
0087
35J
2M
WS
T-B
ar1
SE
G33
1104
93-3
0510
3000
0186
21J
3S
mal
l EV
A T
rash
Bag
1S
EG
3310
6678
-301
1006
-C
ON
FIR
M e
mpt
y &
zip
ped
up.
4S
win
g A
rm A
ssy,
RH
1S
EG
3311
0491
-307
1004
-
5P
GT
1G
E15
5700
0-
-R
EPO
RT
larg
e ID
# to
MC
C-H
.
67/
16 x
6" W
obbl
e1
SE
G33
1069
31-3
0110
1900
4343
J
7B
ody
Res
train
t Tet
her
[BR
T A
ssem
bly]
1S
EG
3311
0400
-309
1017
-
8E
q H
k R
ET
[Sm
-Sm
]3
SE
G33
1061
64-3
81-
-U
se R
ed R
ETs
STO
W 1
on
the
BR
T, 1
on
the
T-B
ar, a
nd u
se o
ne to
con
nect
the
PG
T to
the
swin
g ar
m.
9E
q H
k R
ET
w/P
ip P
in1
SE
G33
1061
64-3
83-
-U
se R
ed R
ETs
STO
W o
n th
e T-
Bar
.
10A
djus
tabl
e E
quip
men
t Tet
her
[Sm
-Sm
]2
SE
G33
1069
45-3
07-
-ST
OW
dire
ctly
on
the
T-B
ar.
22-0
738:
STS
-130
/20A
EVA
Res
tow
& 1
9A T
ool C
onfig
OVE
RVI
EW:
This
mes
sage
is d
esig
ned
to re
stow
the
tool
s de
ploy
ed fo
r the
20A
EV
As
and
conf
igur
e fo
r the
19A
EV
As.
PRO
CED
UR
E:
1. P
erfo
rm S
TS-1
30 E
VA
CH
EC
KLI
ST:
FS
8 -1
6 C
RE
W T
ETH
ER
INS
PE
CTI
ON
S, P
arts
1 a
nd 2
onl
y fo
r all
Wai
st a
nd S
afet
y te
ther
s an
d D
-rin
g ex
tend
ers
2
. Per
form
STS
-130
EV
A C
HE
CK
LIS
T: F
S 8
- 22
BR
T IN
SP
EC
TIO
N fo
r all
used
BR
Ts
3. C
ON
FIR
M th
at th
ere
is a
D-R
ing
Ext
ende
r on
A/L
D-R
ing.
4. R
EMO
VE a
ll te
ther
s fro
m a
ll ba
gs a
nd M
WS
and
STO
W th
em o
n th
e te
ther
sta
ging
are
a. A
lso
TEM
P ST
OW
any
wire
ties
you
con
side
re-u
sabl
e fo
r 19A
.
5. M
OVE
any
item
s in
side
the
"20A
Too
ls E
VA 1
", "2
0A T
ools
EVA
2",
"20A
Too
ls E
VA 3
" mes
h ba
gs, c
rew
lock
bag
s, a
nd d
eplo
yed
OR
U b
ags
into
the
"Don
e To
ols"
mes
h ba
g.
6. R
EMO
VE la
bels
from
Cre
wlo
ck B
ags.
7
. REL
AB
EL a
n em
pty
mes
h ba
g: "
19A
Too
ls".
8. C
OM
PLET
E Ta
bles
A -
H.
9
. REP
OR
T to
MC
C-H
whe
n ac
tivity
is c
ompl
ete,
the
requ
este
d S
/N in
form
atio
n, a
nd a
ny d
elta
s.
Tabl
e A
: Con
figur
e EV
1 M
WS
EV1
A/L
1D2
Teth
er S
tagi
ng
Are
a
EV1
Pag
e 1
of 1
4, 2
2-07
38 (M
SG
139
)
40
22-0
738
(MSG
139
)- ST
S-13
0/20
A E
VA R
esto
w 1
9A T
ool C
onfig
Page
2 o
f 14
11Te
mp
Stow
ed(u
sed
for 2
0A)
orA
/L1O
0Zi
ploc
k
Wire
Tie
s[S
hort]
5S
DG
3310
8130
-001
--
EV1
STO
W (d
on't
conf
igur
e) 2
wire
ties
on
BR
T an
d 3
on th
e T-
bar.
Item
#
Loca
tion
Item
QT Y
P/N
S/N
B/C
Fina
l Loc
atio
nN
otes
12M
WS
Bas
epla
te[M
odul
ar B
asep
late
Ass
embl
y]1
SE
G33
1104
90-3
0310
02-
13M
WS
T-B
ar1
SE
G33
1104
93-3
0510
06-
14S
mal
l EV
A T
rash
Bag
1S
EG
3310
6678
-301
1007
-C
ON
FIR
M e
mpt
y &
zip
ped
up.
15
PM
A3
Con
nect
or C
ap1
NZG
L-P
PC
-N-2
5-R
P60
3-
N1P
2 N
ode
3 U
nins
talle
d H
ardw
are
Pla
ce in
zip
lock
bag
and
labe
l "P
MA
3 co
nnec
tor c
ap".
Stow
in
Hal
f CTB
106
5, in
side
3.0
CTB
10
48 la
bele
d N
ode
3 un
inst
alle
d ha
rdw
are
16S
win
g A
rm A
ssy,
RH
1S
EG
3311
0491
-307
1003
-
17P
GT
1G
E15
5700
0-
-R
EPO
RT
larg
e ID
# to
MC
C-H
.
187/
16 x
6" W
obbl
e1
SE
G33
1069
31-3
0110
07-
19B
ody
Res
train
t Tet
her
[BR
T A
ssem
bly]
1S
EG
3311
0400
-309
1021
-
EV1:
□
MW
S -
(Item
#1)
□
T-B
ar -
(Item
#2)
□
RE
T (e
q-eq
) - (I
tem
#8)
□
RE
T w
/PIP
Pin
- (It
em #
9)
□ A
dj E
quip
Tet
her (
2) -
(Item
#10
)
□ W
ire T
ie (3
) - (I
tem
#11
)
□ S
mal
l EV
A T
rash
Bag
- (It
em #
3)
□
Sw
ing
Arm
(R) -
(Ite
m #
4)
□ R
ET
(eq-
eq)
- (Ite
m #
8)
□
PG
T w
/6-in
ext
- (It
em #
5 &
#6)
□ B
RT
(L) -
(Ite
m #
7)
□ R
ET
(eq-
eq) -
(Ite
m #
8)
□ W
ire T
ie (2
) - (I
tem
#11
)
REP
OR
T an
y ad
ditio
nal i
tem
s fo
und
to M
CC
-H.
EV2
Tabl
e B
: C
onfig
ure
EV2
MW
S
EV2
Pag
e 2
of 1
4, 2
2-07
38 (M
SG
139
)
41
22-0
738
(MSG
139
)- ST
S-13
0/20
A E
VA R
esto
w 1
9A T
ool C
onfig
Page
3 o
f 14
20E
q H
k R
ET
[Sm
-Sm
]2
SE
G33
1061
64-3
81-
-U
se R
ed R
ETs
STO
W 1
on
the
BR
T an
d 1
on T
-B
ar.
21E
q H
k R
ET
w/P
ip P
in2
SE
G33
1061
64-3
83-
-U
se R
ed R
ETs
STO
W o
ne o
n th
e T-
Bar
and
use
on
e to
atta
ch th
e P
GT
to th
e S
win
g A
rm.
22A
djus
tabl
e E
quip
men
t Tet
her
[Sm
-Sm
]1
SE
G33
1069
45-3
07-
-ST
OW
1 d
irect
ly o
n th
e T-
Bar
.
23Te
mp
Stow
ed(u
sed
for 2
0A)
orA
/L1O
0Zi
ploc
k
Wire
Tie
s[S
hort]
4S
DG
3310
8130
-001
--
STO
W (d
on't
conf
igur
e) 2
wire
ties
on
BR
T an
d 2
on th
e T-
bar.
EV2
EV2:
□
MW
S -
(Item
#12
)
□
T-B
ar -
(Item
#13
)
□ R
ET
(eq-
eq) -
(Ite
m #
19)
□
RE
T w
/PIP
Pin
- (It
em #
20)
□
Adj
Equ
ip T
ethe
r - (I
tem
#21
)
□ W
ire T
ie (2
) - (I
tem
#22
)
□ S
mal
l EV
A T
rash
Bag
- (It
em #
14)
□ S
win
g A
rm (R
) - (I
tem
#15
)
□ R
ET
w/P
IP P
in -
(Item
#20
)
□
PG
T w
/6-in
ext
- (It
em #
16 &
#17
)
□
BR
T (L
) - (I
tem
#18
)
□ R
ET
(eq-
eq) -
(Ite
m #
19)
□
Wire
Tie
(2) -
(Ite
m #
22)
REP
OR
T an
y ad
ditio
nal i
tem
s fo
und
to M
CC
-H.
A/L
1D2
Teth
er S
tagi
ng
Are
a
Pag
e 3
of 1
4, 2
2-07
38 (M
SG
139
)
42
22-0
738
(MSG
139
)- ST
S-13
0/20
A E
VA R
esto
w 1
9A T
ool C
onfig
Page
4 o
f 14
Item
#
Loca
tion
Item
QTY
P/N
S/N
B/C
Fina
l Loc
atio
nN
otes
24A
/L1D
2Te
ther
Sta
ging
A
rea
Lg-E
q R
ET
[Lg-
Sm
]1
SE
G33
1061
64-3
85-
-U
se R
ed R
ET.
25A
/L C
rew
lock
Cre
wlo
ck E
VA
Bag
#1
1S
EG
3311
1751
-301
1001
-ST
OW
on
Lg-E
q R
ET.
26A
djus
tabl
e E
quip
men
t Tet
her
[Sm
-Sm
]4
SE
G33
1069
45-3
07-
-ST
OW
4 o
n th
e ou
tsid
e of
C
rew
lock
Bag
#1
27S
afet
y Te
ther
55f
t1
SE
G33
1066
74-3
07-
-R
EPO
RT
larg
e ID
# u
sed
to M
CC
-H
.
STO
W o
ne o
n th
e ou
tsid
e of
C
rew
lock
Bag
#1.
28E
q H
k R
ET
[Sm
-Sm
]1
SE
G33
1061
64-3
81-
-U
se R
ed R
ET.
STO
W in
side
Cre
wlo
ck B
ag #
1 fo
r ca
mer
as.
29A
/L1O
01.
0 C
TB: E
VA
M
isce
llane
ous
Tool
s #2
, S/N
11
61, B
/C
0041
55J
Rou
nd S
coop
1S
EG
3310
7677
-301
--
STO
W in
side
Cre
wlo
ck B
ag #
1 fo
r M
PA
C/S
EE
D.
Cre
wlo
ckD
eplo
yed
Cre
wlo
ck B
ag #
1
Cre
wlo
ckD
eplo
yed
Tabl
e C
: Con
figur
e C
rew
lock
Bag
#1
A/L
1D2
Teth
er S
tagi
ng
Are
a
Pag
e 4
of 1
4, 2
2-07
38 (M
SG
139
)
43
22-0
738
(MSG
139
)- ST
S-13
0/20
A E
VA R
esto
w 1
9A T
ool C
onfig
Page
5 o
f 14
30E
VA
Rat
chet
1S
EG
3310
6927
-303
1015
-ST
OW
insi
de C
rew
lock
Bag
#1
on
Int R
ET.
Ver
ify n
o P
alm
Whe
el.
317/
16 x
2" R
igid
1S
EG
3310
6930
-301
1008
-ST
OW
on
EV
A R
atch
et o
n In
t R
ET.
32A
/L C
rew
lock
Sta
ging
Bag
Pry
Bar
1S
DG
3310
6924
-001
1004
0000
1199
JST
OW
insi
de C
rew
lock
Bag
#1
on
Int R
ET.
33E
VA
Rat
chet
1S
EG
3310
6927
-303
1012
-ST
OW
insi
de C
rew
lock
Bag
#1
on
Int R
ET.
See
nex
t lin
e fo
r 2"
sock
et in
stal
l
R
epor
t s/n
of P
alm
Whe
el a
nd
stow
in 1
.0 C
B 1
161.
34
7/1
6 x
2" R
igid
1S
EG
3310
6930
-301
1006
-ST
OW
on
EV
A R
atch
et o
n In
t R
ET.
35R
ound
Tor
que
Mul
tiplie
r1
SE
G33
1062
60-3
0110
02-
STO
W in
side
Cre
wlo
ck B
ag #
1
367/
16" S
ocke
t Flu
sh R
ound
Tor
que
Mul
tiplie
r1
SD
G33
1070
87-0
0310
12-
STO
W in
side
Cre
wlo
ck B
ag #
1 on
R
ound
Tor
que
Mul
tiplie
r.
37A
/L1D
2Te
ther
Sta
ging
A
rea
Adj
usta
ble
Fuse
Tet
her
[Fis
h S
tring
er]
1S
ED
3912
7200
-705
--
STO
W in
side
Cre
wlo
ck B
ag #
1.
38N
H3
QD
Cap
21F
4558
0-1
314
31
5-
STO
W in
side
Cre
wlo
ck B
ag #
1 on
Fi
sh S
tring
er.
39N
H3
QD
Cap
21F
4558
0-50
1A
ny-
STO
W in
side
Cre
wlo
ck B
ag #
1 on
Fi
sh S
tring
er.
Cre
wlo
ckD
eplo
yed
Cre
wlo
ck B
ag #
1
A/L
1O0
1.0
CTB
: EV
A
Mis
cella
neou
s To
ols
#2, S
/N
1161
, B/C
00
4155
J
A/L
Dep
loye
d(M
esh
Bag
: Don
e To
ols)
A/L
1D2
1.
0 C
TB: U
niqu
e E
VA
Too
ls, S
/N
1022
, B/C
00
2317
J
Pag
e 5
of 1
4, 2
2-07
38 (M
SG
139
)
44
22-0
738
(MSG
139
)- ST
S-13
0/20
A E
VA R
esto
w 1
9A T
ool C
onfig
Page
6 o
f 14
Cre
wlo
ck B
ag #
1:
□
RE
T (L
g-sm
) - (I
tem
#23
)
□
C/L
bag
- (It
em #
24)
□
Adj
Tet
her (
outs
ide
– tie
dow
n) (2
) - (I
tem
#25
)
□ R
ET
(sm
-sm
) - (I
tem
#27
)
□ A
dj T
ethe
r (ou
tsid
e –
MP
AC
/SE
ED
) - (I
tem
#25
)
□ A
dj T
ethe
r (ou
tsid
e –
MP
AC
/SE
ED
) - (I
tem
#25
)
□
Rou
nd S
coop
- (It
em #
28)
□
55-
ft S
afet
y Te
ther
- (It
em #
26)
□
Rat
chet
(No
Pal
m W
heel
) (In
t RE
T #1
) - (I
tem
#29
)
□
7/1
6-2-
in ri
gid
ext -
(Ite
m #
30)
□
Rou
nd T
M (I
nt R
ET
#2) -
(Ite
m #
33)
□ 7
/16-
in F
lush
Soc
ket -
(Ite
m #
34)
□
Pry
bar (
Int R
ET
#3) -
(Ite
m #
31)
□
Rat
chet
(No
Pal
m W
heel
) (In
t RE
T #4
) - (I
tem
#35
)
□
7/1
6-2-
in ri
gid
ext -
(Ite
m #
32)
□
Fis
h S
tring
er -
(Item
#36
)
□
1/4
-in F
luid
Cap
s (2
) - (I
tem
#37
)
□
1/2
-in F
luid
Cap
s (2
) - (I
tem
#38
)
R
EPO
RT
any
addi
tiona
l ite
ms
foun
d to
MC
C-H
.
Pag
e 6
of 1
4, 2
2-07
38 (M
SG
139
)
45
22-0
738
(MSG
139
)- ST
S-13
0/20
A E
VA R
esto
w 1
9A T
ool C
onfig
Page
7 o
f 14
Item
#
Loca
tion
Item
QTY
P/N
S/N
B/C
Fina
l Loc
atio
nN
otes
40A
/L D
eplo
yed
OR
U T
rans
fer B
ag L
arge
1S
EG
3311
4494
-307
1002
0000
8707
J
41S
afet
y Te
ther
55f
t1
SE
G33
1066
74-3
07-
-R
EPO
RT
larg
e ID
# u
sed
to M
CC
-H
.
STO
W in
Lar
ge O
RU
Bag
.
42E
q H
k R
ET
[Sm
-Sm
]2
SE
G33
1061
64-3
81-
-U
se R
ed R
ETs
STO
W in
Lar
ge O
RU
Bag
.
43A
djus
tabl
e E
quip
men
t Tet
her
[Sm
-Sm
]1
SE
G33
1069
45-3
07-
-ST
OW
on
outs
ide
of L
arge
OR
U
Bag
.
44Lg
-Eq
RE
T[L
g-S
m]
1S
EG
3310
6164
-385
--
Use
Red
RET
.
STO
W o
n ou
tsid
e of
Lar
ge O
RU
B
ag.
A/L
1D2
Teth
er S
tagi
ng
Are
a
Larg
e O
RU
Bag
:
□
RE
T (L
g-sm
) - (I
tem
#43
)
□
Larg
e O
RU
bag
- (It
em #
39)
□
Adj
Tet
her (
outs
ide
– tie
dow
n) (L
ower
Rig
ht L
oop)
□
RE
T (s
m-s
m) -
(Ite
m #
41)
□
RE
T (s
m-s
m) -
(Ite
m #
42)
□
55-
ft S
afet
y Te
ther
(Atta
ch in
side
- E
RC
M o
utsi
de) -
(Ite
m #
40)
REP
OR
T an
y ad
ditio
nal i
tem
s fo
und
to M
CC
-H.
Cre
wlo
ckD
eplo
yed
Tabl
e D
: Con
figur
e La
rge
OR
U B
ag
Pag
e 7
of 1
4, 2
2-07
38 (M
SG
139
)
46
22-0
738
(MSG
139
)- ST
S-13
0/20
A E
VA R
esto
w 1
9A T
ool C
onfig
Page
8 o
f 14
Item
#
Loca
tion
Item
QTY
P/N
S/N
B/C
Fina
l Loc
atio
nN
otes
45A
djus
tabl
e Fu
se T
ethe
r[F
ish
Stri
nger
]1
SE
D39
1272
00-7
0510
11-
46Ta
pe a
nd V
elcr
o C
addy
1S
ED
3310
4207
-301
1005
-
47P
GT
1G
E15
5700
0-
-R
EPO
RT
larg
e ID
# to
MC
C-H
.
487/
16 x
6" W
obbl
e1
SE
G33
1069
31-3
0110
18-
49E
VA
Rat
chet
1S
EG
3310
6927
-303
1012
-
507/
16 x
9" R
igid
1S
EG
3310
6930
-305
1013
0019
56J
51H
AM
ME
R1
SE
G33
1069
17-3
0110
01-
52A
djus
tabl
e Fu
se T
ethe
r[F
ish
Stri
nger
]1
SE
D39
1272
00-7
0510
32-
53C
onne
ctor
Cle
aner
Too
l Kit
1S
JG33
1116
30-3
0110
10-
54P
in S
traig
hten
er A
ssy
1S
EG
3310
6913
-301
1001
0019
48J
55P
RO
BE
1S
EG
3310
6923
-701
1001
-
56M
MW
S K
ey S
trap
Ass
embl
y1
SE
G33
1108
12-3
0110
0800
0086
53J
57W
ire T
ie C
addy
Ass
y1
SE
G33
1115
86-3
0110
05-
CO
NFI
RM
that
this
cad
dy
cont
ains
9 w
ire ti
es.
58N
eedl
e N
ose
Plie
rs1
SE
G33
1069
21-3
0110
07-
Tabl
e E:
Con
firm
Sta
ging
Bag
Con
fig
A/L
Cre
wlo
ckS
tagi
ng B
agA
/L C
rew
lock
Sta
ging
Bag
Pag
e 8
of 1
4, 2
2-07
38 (M
SG
139
)
47
22-0
738
(MSG
139
)- ST
S-13
0/20
A E
VA R
esto
w 1
9A T
ool C
onfig
Page
9 o
f 14
59W
IF A
dapt
er1
SE
G33
1068
63-3
0910
15
60V
ise
Grip
Plie
rs1
SE
G33
1069
22-3
0110
01-
61S
afet
y Te
ther
55f
t1
SE
G33
1066
74-3
07-
-A
/L1D
2Te
ther
Sta
ging
Are
aR
EPO
RT
larg
e ID
# to
MC
C-H
.
62S
afet
y Te
ther
85f
t1
SE
D33
1161
09-3
07-
-R
EPO
RT
larg
e ID
# to
MC
C-H
.
63E
q H
k R
ET
[Sm
-Sm
]1
SE
G33
1061
64-3
81-
-
64A
/L1D
21.
0 C
TB: U
niqu
e E
VA
Too
ls, S
/N
1022
, B/C
00
2317
J
BR
S T
ool
1S
EG
3311
3644
-305
1001
-
65A
/L1O
01.
0 C
TB: E
VA
M
isce
llane
ous
Tool
s #2
, S/N
11
61, B
/C
0041
55J
Che
ater
Bar
1S
EG
3310
6926
-301
1002
-
66A
/L D
eplo
yed
(Mes
h B
ag: D
one
Tool
s)
LDTD
Tet
her
1S
EG
3311
3860
-301
--
REP
OR
T s/
n to
MC
C-H
67A
/L1O
0
1.0
CTB
: EV
A
Mis
cella
neou
s To
ols
#2, S
/N
1161
, B/C
00
4155
J
Rig
ht A
ngle
Driv
e1
SE
G33
1069
25-3
0510
09-
A/L
Cre
wlo
ckS
tagi
ng B
agA
/L C
rew
lock
Sta
ging
Bag
A/L
1D2
Teth
er S
tagi
ng
Are
a
A/L
Cre
wlo
ckS
tagi
ng B
ag
Pag
e 9
of 1
4, 2
2-07
38 (M
SG
139
)
48
22-0
738
(MSG
139
)- ST
S-13
0/20
A E
VA R
esto
w 1
9A T
ool C
onfig
Page
10
of 1
4
Stag
ing
Bag
:
□
Fis
h S
tring
er -
(Item
#44
)
□
Wire
Tie
Cad
dy (H
ook
#1) -
(Ite
m #
56)
□
V
elcr
o/Ta
pe C
addy
(Hoo
k #2
) - (I
tem
#45
)
□
PG
T (H
ook
#3) -
(Ite
m #
46)
□
7/1
6 (w
obbl
e) S
ocke
t-6 e
xt -
(Item
#47
)
□
Vis
e G
rips
(Hoo
k #4
) - (I
tem
#59
)
□
Rat
chet
Wre
nch
(Hoo
k #5
) - (I
tem
#48
)
□
7/1
6 (r
igid
) Soc
ket-9
ext
- (It
em #
49)
□
N
eedl
e N
ose
Plie
rs (H
ook
#6) -
(Ite
m #
57)
□
S
pare
WIF
Ada
pter
(Hoo
k #7
) - (I
tem
#58
)
□
Spa
re 8
5-ft
Saf
ety
Teth
er -
(Item
#61
)
□
Fis
h S
tring
er -
(Item
#51
)
□
Con
nect
or C
lean
er T
ool K
it (H
ook
#1) -
(Ite
m #
52)
□
P
in S
traig
hten
er A
ssy
(Hoo
k #2
) - (I
tem
#53
)
□
Pro
be w
/She
ath
(Hoo
k #3
) - (I
tem
#54
)
□
Ham
mer
(Hoo
k #4
) - (I
tem
#50
)
□
Che
ater
Bar
(Hoo
k #5
) - (I
tem
#64
)
□
BR
S P
in T
ool (
Hoo
k #7
) - (I
tem
#63
)
□
MW
S K
ey S
trap
Ass
y (o
n W
ire ti
e, to
stra
p) -
(Item
#56
)
□
Long
Dur
atio
n Ti
e-D
own
Teth
er -
(Item
#64
)
□
RE
T (s
m-s
m) -
(Ite
m #
62)
□
Rig
ht A
ngle
Driv
e - (
Item
#66
)
REP
OR
T an
y ad
ditio
nal i
tem
s fo
und
to M
CC
-H.
Pag
e 10
of 1
4, 2
2-07
38 (M
SG
139
)
49
22-0
738
(MSG
139
)- ST
S-13
0/20
A E
VA R
esto
w 1
9A T
ool C
onfig
Page
11
of 1
4
Item
#
Loca
tion
Item
QTY
P/N
S/N
B/C
Fina
l Loc
atio
nN
otes
68IS
S C
onta
min
atio
n D
etec
tion
Kit
1S
JG39
1360
50-3
0210
01-
69To
wel
[Wra
pped
with
sho
rt w
ire ti
e]2
--
-
70E
q H
k R
ET
[Sm
-Sm
]1
SE
G33
1061
64-3
8140
62-
71S
AFE
R H
and
Con
trolle
r Mou
nt[D
CM
Plu
g]1
SV
1006
962-
2'0
0004
0005
1187
J
72S
AFE
R H
and
Con
trolle
r Mou
nt[D
CM
Plu
g]1
SV
1006
962-
2'0
0007
0005
9995
J
73E
q H
k R
ET
[Sm
-Sm
]1
SE
G33
1061
64-3
8140
63-
74IS
S G
P C
addy
1S
EG
3311
3531
-301
1008
-
75A
djus
tabl
e Th
erm
al M
itten
101
06-8
1154
0-03
'022
EM
UG
15J
76A
djus
tabl
e Th
erm
al M
itten
101
06-8
1154
0-04
'022
EM
UA
16J
77IS
S G
P C
addy
1S
EG
3311
3531
-301
1010
-
78A
djus
tabl
e Th
erm
al M
itten
101
06-8
1154
0-03
'023
EM
UG
19J
79A
djus
tabl
e Th
erm
al M
itten
101
06-8
1154
0-04
'023
EM
UG
20J
80E
q H
k R
ET
[Sm
-Sm
]1
SE
G33
1061
64-3
8140
73-
81S
ocke
t Cad
dy A
ssy
1S
EG
3310
6938
-301
1011
-
821/
2 x
8" W
obbl
e1
SE
G33
1084
23-3
0110
04-
837/
16 x
6" W
obbl
e1
SE
G33
1069
31-3
0110
14-
84A
mm
onia
Con
tam
inat
ion
Cue
Car
d
A/L
Cre
wlo
ckIV
Bag
A/L
Cre
wlo
ckIV
Bag
CO
NFI
RM
con
tent
s an
d co
nfig
urat
ion
of IV
Bag
.
Bla
ck R
ETs
sta
y in
this
bag
(not
fo
r EV
A).
Tabl
e F:
Con
firm
IV B
ag C
onfig
Pag
e 11
of 1
4, 2
2-07
38 (M
SG
139
)
50
22-0
738
(MSG
139
)- ST
S-13
0/20
A E
VA R
esto
w 1
9A T
ool C
onfig
Page
12
of 1
4
Item
#
Loca
tion
Item
QTY
P/N
S/N
B/C
Fina
l Loc
atio
nN
otes
85N
OD
1D2
Mes
h B
ag1
SK
D13
1014
94-3
05-
-C
rew
lock
Dep
loye
dLa
bel "
19A
EV
A to
ols
"
861/
4"X
1/2"
Alle
n D
river
[MM
OD
Shi
eld
T-H
andl
e (S
hort)
]1
SE
D39
1270
91-3
0110
0300
0019
95J
87S
ocke
t Cad
dy A
ssy
2S
EG
3310
6938
-301
1001
1010
0019
45J
885/
8 x
7.8"
Rig
id1
SE
G33
1069
34-3
0110
02-
Stow
in S
ocke
t Cad
dy S
/N 1
001.
89A
/L D
eplo
yed
(Mes
h B
ag: D
one
Tool
s)
SQ
UA
RE
SC
OO
P1
SE
G33
1063
30-3
0110
0100
4281
J
90A
/L1O
0
1.0
CTB
: EV
A
Mis
cella
neou
s To
ols
#1, S
/N
1075
, B/C
00
4069
J
Wor
ksite
Inte
rface
Ada
pter
1S
EG
3310
6863
-309
1013
-
91EV
1Te
ther
Ext
ensi
on A
ssem
bly
[D-R
ing
Ext
ende
r]2
SE
G33
1123
21-7
0110
0610
01-
92EV
2Te
ther
Ext
ensi
on A
ssem
bly
[D-R
ing
Ext
ende
r]2
SE
G33
1123
21-7
0110
0710
10-
-
IV B
ag:
□
Am
mon
ia C
onta
min
atio
n C
ue C
ard
- (Ite
m #
83)
□
2 -
Tow
els
- (Ite
m #
68)
□
Con
tam
inat
ion
Det
ectio
n K
it - (
Item
#67
)
□
RE
T (s
m-s
m, b
lack
) - (I
tem
#69
)
□ 2
- D
CM
Plu
g - (
Item
#70
& 7
1)
□
RE
T (s
m-s
m, b
lack
) - (I
tem
#72
)
□ 2
- G
P C
addy
- (It
em #
73 &
#76
)
□
2 -
Adj
usta
ble
Ther
mal
Mitt
ens
- (Ite
m #
74, #
75, #
77, &
#78
)
□
RE
T (s
m-s
m, b
lack
) - (I
tem
#79
)
□ S
ocke
t Cad
dy -
(Item
#80
)
□
1/2
-in S
ocke
t-8 e
xt -
(Item
#81
)
□
7/1
6 (w
obbl
e) S
ocke
t-6 e
xt -
(spa
re) (
Item
#82
)
REP
OR
T an
y ad
ditio
nal i
tem
s fo
und
to M
CC
-H.
Cre
wlo
ckD
eplo
yed
M
esh
Bag
: 19A
EV
A
tool
s
Tabl
e G
: Con
figur
e 19
A E
VA to
ols
Mes
h B
ag
A/L
1O0
1.
0 C
TB: E
VA
M
isce
llane
ous
Tool
s #2
, S/N
11
61, B
/C
0041
55J
Pag
e 12
of 1
4, 2
2-07
38 (M
SG
139
)
51
22-0
738
(MSG
139
)- ST
S-13
0/20
A E
VA R
esto
w 1
9A T
ool C
onfig
Page
13
of 1
4
Item
#
Loca
tion
Item
QTY
P/N
S/N
B/C
Fina
l Loc
atio
nN
otes
93W
ire T
ies
[Lon
g]A
LLS
DG
3310
8130
-003
--
A/L
1O0
Zipl
ock
94W
ire T
ies
[Sho
rt]A
LLS
DG
3310
8130
-001
--
A/L
1O0
Zipl
ock
95S
MA
LL Q
D B
AIL
LE
VE
R1
SD
G33
1138
38-7
0310
04-
CO
NFR
IM th
at th
ere
are
no o
ther
S
mal
l QD
Bai
l Lev
ers
in th
is C
TB.
961.
0-IN
QR
T1
SE
G33
1146
16-7
0110
02-
CO
NFR
IM th
at th
ere
are
no o
ther
1.
0 In
ch Q
RTs
in th
is C
TB.
971.
0 In
ch B
DT
1S
EG
3311
4987
-301
1001
-
98Q
D A
KT
1S
EG
3311
4982
-301
1005
-
991
N2
Ven
t Too
l1
1F98
596-
12
-ST
OW
insi
de C
rew
lock
Bag
#1
on
RE
T.
100
Wire
Tie
Cad
dy A
ssy
1S
EG
3311
1586
-301
1003
-A
/L1O
01.
0 C
TB: M
WS
H
ardw
are,
S/N
10
13, B
/C 0
0230
8J
CO
NFI
RM
that
this
cad
dy
cont
ains
9 w
ire ti
es.
101
Tras
h B
ag L
arge
2S
EG
3310
6937
-301
1012
1001
-A
/L1O
01.
0 C
TB: E
VA
M
isce
llane
ous
Tool
s #1
, S/N
107
5, B
/C
0040
69J
CO
NFI
RM
Em
pty
A/L
Dep
loye
d(M
esh
Bag
: Don
e To
ols)
A/L
1O0
1.0
CTB
: QD
Tr
aine
r, S
/N 1
258,
B
/C 0
1059
4J
A/L
Dep
loye
d
Tabl
e H
: Res
tow
item
s fr
om 2
0A D
one
Tool
s M
esh
Bag
and
A/L
Dep
loye
d
RES
TOW
all
tem
p st
owed
wire
tie
s th
at w
ere
not u
sed
for t
he 1
9A
conf
ig.
19A
Mes
h B
ag:
□
Mes
h B
ag -
(Item
#84
)
□ S
hort
MM
OD
Shi
eld
T-ha
ndle
- (It
em #
85)
□
Soc
ket C
addy
- (It
em #
86)
□
Soc
ket C
addy
- (It
em #
86)
□ 5
/8 x
7.8
-in ri
gid
sock
et (C
ente
r Pos
t) - (
Item
#87
)
□ S
quar
e S
coop
- (It
em #
88)
□
WIF
Ada
pter
- (It
em #
89)
□
D-R
ing
Ext
ende
r (4)
- (It
ems
#90
& #
91)
REP
OR
T an
y ad
ditio
nal i
tem
s fo
und
to M
CC
-H.
Pag
e 13
of 1
4, 2
2-07
38 (M
SG
139
)
52
22-0
738
(MSG
139
)- ST
S-13
0/20
A E
VA R
esto
w 1
9A T
ool C
onfig
Page
14
of 1
4
102
Plu
g P
rote
ctiv
e C
over
w T
ethe
r Rin
g3
--
-In
side
Zip
lock
Bag
labe
led
"PM
A 3
H
eate
r Cab
le C
over
Pro
tect
ive
Cap
s"
103
Con
nect
or C
ap S
ize
17
11F
0091
8-1
--
Insi
de Z
iplo
ck B
ag la
bele
d "P
MA
3
Hea
ter C
able
Cov
er P
rote
ctiv
e C
aps"
104
1" Q
D C
ap4
1F45
580-
505
--
105
1" Q
D P
lug
41F
4558
1-50
5-
-
106
Med
ium
OR
U T
rans
fer B
ag1
SE
G33
1144
94-3
0910
0400
0086
94J
-C
rew
lock
Dep
loye
d
107
7/16
x 1
2" W
obbl
e1
SE
G33
1069
32-3
0110
07-
108
7/16
x 1
8" W
obbl
e1
SE
G33
1069
33-3
0110
07-
109
SQ
UA
RE
SC
OO
P1
SE
G33
1063
30-3
0110
0200
4286
J
110
NP
V B
ase
Pla
te
122
0F01
107-
003
--
111
MLI
Cov
er[fr
om N
PV
Bas
e P
late
] 1
683-
1161
5-25
--
112
Jum
per B
ag1
684-
0140
24-0
001
--
Thes
e ite
ms
may
be
depl
oyed
lo
ose
in th
e A
/L.
113
Cup
ola
MLI
230
00C
N00
5-80
100
001
0000
2-
114
PC
BM
Con
tam
inat
ion
Cov
er8
683-
1360
3-1
683-
1360
3-2
683-
1360
3-3
683-
1360
3-4
--
115
Adj
usta
ble
Fuse
Tet
her
[Fis
h S
tring
er]
2S
ED
3912
7200
-705
1029
1030
-A
/L1D
2Te
ther
Sta
ging
Are
a11
6C
rew
lock
EV
A B
ag
3S
EG
3311
1751
-301
--
A/L
End
cone
CO
L1D
25
MLE
Bag
F
A/L
1O0
1.0
CTB
: EV
A
Mis
cella
neou
s To
ols
#2, S
/N 1
161,
B/C
00
4155
J
NO
D1P
4_C
11.
0 C
TB: M
ISC
E
xter
nal H
ardw
are,
S
/N 1
445,
B/C
C
TB00
135E
A/L
Dep
loye
d(M
esh
Bag
: Don
e To
ols)
A/L
1D2
1.0
CTB
: Uni
que
EV
A T
ools
, S/N
10
22, B
/C 0
0231
7J
Pag
e 14
of 1
4, 2
2-07
38 (M
SG
139
)
53
22-0638 (MSG 140) 3.2.711 ROTATION HAND CONTROLLER FABRIC BOOT INSTALLATION
(IFM/20A - ALL/FIN 1/REAL-TIME) Page 1 of 13 pages
08 FEB 10 16739.doc
OBJECTIVE: Install Fabric Boot to Rotation Hand Controller (RHC) on Robotic Workstation (RWS) to protect RHC circuitry from radiation. It is assumed that RWS powerdown has been completed and that RWS powerup can occur after completion of this procedure. Does not include diagnostic steps following RHC reinstall. LOCATION: LAB DURATION: 45 minutes Total Crew Time
30 minutes Remove and Install RHC 15 minutes Install Fabric Boot
CREW: One PARTS: EMC Boot Kit (P/N 204215-551):
Contact Strip P/N 204213-501 Upper Clamp P/N 204212-501,-503,-505 Fabric Boot P/N 204216-501 Lower Clamp P/N 204214-501,-503
MATERIALS: Ziplock Bag TOOLS: Digital Camera ISS IVA Toolbox: Drawer 2:
Driver Handle, 1/4" Drive 5/64" Hex Head, 1/4" Drive 1/8" Hex Head, 1/4" Drive (10-50 in-lbs) Trq Wrench, 1/4" Drive
Drawer 5: Static Wrist Tether
54
22-0638 (MSG 140) 3.2.711 ROTATION HAND CONTROLLER FABRIC BOOT INSTALLATION
(IFM/20A - ALL/FIN 1/REAL-TIME) Page 2 of 13 pages
08 FEB 10 16739.doc
Figure 1.- Final Configuration of RHC with Fabric Boot Installed.
1. SAFING
1.1 If at LAB1S5 √MCC-H
RPCM LAS52A3B_A RPC 18 is open, close cmd inh. 1.2 If at LAB1P5 √MCC-H
RPCM LAP51A4A_A RPC 18 is open, close cmd inh. PCS 1.3 Verify PCS switched to Battery power. 1.4 Powering Down PCS sel PCSCDS Main
sel Commands sel Shutdown sel Yes
NOTE A shutdown nominally powers off the PCS. There are two beeps and scrolling DOS style writing prior to the screen going blank and a final beep. After the final beep, the PCS should be powered off.
PCSCDS Main Control Panel
Verify Shutdown
55
22-0638 (MSG 140) 3.2.711 ROTATION HAND CONTROLLER FABRIC BOOT INSTALLATION
(IFM/20A - ALL/FIN 1/REAL-TIME) Page 3 of 13 pages
08 FEB 10 16739.doc
At the taskbar on bottom of display sel Start sel Shutdown
Shutdown Menu sel Shutdown Wait for the screen to go blank and the PCS to beep. 2. REMOVING ROTATION HAND CONTROLLER
Figure 2.- RWS Video Monitor ORUs.
NOTE
The Rotation Hand Controller must be removed to install the Fabric Boot.
2.1 If required, reposition Right Video Monitor ORU to gain access to
Rotation Hand Controller. Refer to Figure 2. 2.2 Don Static Wrist Tether. Secure to unpainted, unanodized metal surface.
Rotation Hand Controller
Right RWS Video Monitor ORU
56
22-0638 (MSG 140) 3.2.711 ROTATION HAND CONTROLLER FABRIC BOOT INSTALLATION
(IFM/20A - ALL/FIN 1/REAL-TIME) Page 4 of 13 pages
08 FEB 10 16739.doc
Figure 3.- Bottom View of DCP.
2.3 If at LAB1S5 1J00137-1-P1 ←|→ J1 on DCP
1J00138-1-P2 ←|→ J2 on DCP W1193-P4 ←|→ J3 on DCP Refer to Figure 3.
2.4 If at LAB1P5 1J00137-1-P1 ←|→ J1 on DCP
1J00138-1-P2 ←|→ J2 on DCP W1293-P4 ←|→ J3 on DCP Refer to Figure 3.
Front of RWS Rack
57
22-0638 (MSG 140) 3.2.711 ROTATION HAND CONTROLLER FABRIC BOOT INSTALLATION
(IFM/20A - ALL/FIN 1/REAL-TIME) Page 5 of 13 pages
08 FEB 10 16739.doc
Figure 4.- Bottom Side of Rotation Hand Controller Showing Connectors.
2.5 W01RHP01 ←|→ J1 on Rotation Hand Controller
W01RHP02 ←|→ J2 on Rotation Hand Controller Refer to Figure 4.
J2J1
Fasteners
Lower Support Structure Assembly
58
22-0638 (MSG 140) 3.2.711 ROTATION HAND CONTROLLER FABRIC BOOT INSTALLATION
(IFM/20A - ALL/FIN 1/REAL-TIME) Page 6 of 13 pages
08 FEB 10 16739.doc
Figure 5.- Rotation Hand Controller Fasteners. 2.6 Remove Rotation Hand Controller, fasteners (four) (Driver Handle,
1/4" Drive; 1/8" Hex Head, 1/4" Drive). Refer to Figure 5.
NOTE
Fasteners securing RHC bezel to housing are non-captive and have associated washers. Care should be taken when removing bezel.
Figure 6.- RHC Bezel Removal.
2.7 Remove non-captive fasteners (four), washers (four) securing RHC
bezel to housing and place fasteners (four), washers (four) in Ziplock Bag (Driver Handle, 1/4" Drive; 1/8" Hex Head, 1/4" Drive).
Refer to Figure 6.
Non-Captive Fasteners and Washers
Bezel
Housing
59
22-0638 (MSG 140) 3.2.711 ROTATION HAND CONTROLLER FABRIC BOOT INSTALLATION
(IFM/20A - ALL/FIN 1/REAL-TIME) Page 7 of 13 pages
08 FEB 10 16739.doc
3. INSTALLING CONTACT STRIP
Figure 7.- Contact Strip on RHC.
Figure 8.- Contact Strips showing Alignment Notch. 3.1 Place Contact Strip between RHC grip and dust boot. Insert closed end of Contact Strip first, aligning alignment notch on
Contact Strip with seam on RHC Grip and dust boot. Refer to Figures 7, 8 3.2 Press Contact Strip into place gradually working toward open end.
Refer to Figure 8. 4. INSTALLING UPPER CLAMP AND FABRIC BOOT
NOTE The Fabric Boot is partially stitched to the Upper Clamp Assembly to minimize the total number of loose parts.
Dust Boot
Alignment Notch
Contact Strip
RHC Grip
Seam
60
22-0638 (MSG 140) 3.2.711 ROTATION HAND CONTROLLER FABRIC BOOT INSTALLATION
(IFM/20A - ALL/FIN 1/REAL-TIME) Page 8 of 13 pages
08 FEB 10 16739.doc
Figure 9.- Fabric Boot and Upper Clamp.
Figure 10.- Fabric Boot and Upper Clamp Placement.
Upper Clamp
Fabric Boot
RHC Grip Upper Clamp
Fabric Boot
Lower Hem
Lower Hem
61
22-0638 (MSG 140) 3.2.711 ROTATION HAND CONTROLLER FABRIC BOOT INSTALLATION
(IFM/20A - ALL/FIN 1/REAL-TIME) Page 9 of 13 pages
08 FEB 10 16739.doc
Figure 11.- Upper Clamp Installation.
4.1 Place Fabric Boot (Upper Clamp end first), over RHC grip.
Refer to Figures 9, 10, 11. 4.2 Position Upper Clamp such that Contact Strip sits within inner
groove of Upper Clamp. Ensure lower hem of Fabric Boot at same height around entire
perimeter. Refer to Figures 10,11. 4.3 Alternately tighten fasteners (three) on Upper Clamp (Driver
Handle,1/4" Drive, 5/64" Hex Head, 1/4" Drive). Refer to Figure 11. Photo document Upper Clamp in configuration similar to Figure 11 (Digital Camera).
Fabric Boot
Dust Boot
Upper Clamp
Fabric Boot
62
22-0638 (MSG 140) 3.2.711 ROTATION HAND CONTROLLER FABRIC BOOT INSTALLATION
(IFM/20A - ALL/FIN 1/REAL-TIME) Page 10 of 13 pages
08 FEB 10 16739.doc
Figure 12.- Fabric Boot Folded Over Dust Boot. 4.4 Fold Fabric Boot down over Upper Clamp to cover entire dust boot. Refer to Figure 12. 5. INSTALLING LOWER CLAMP
Figure 13.- Lower Clamp.
Lower Clamp Ears
Lower Clamp Ear
RHC Housing Lid
63
22-0638 (MSG 140) 3.2.711 ROTATION HAND CONTROLLER FABRIC BOOT INSTALLATION
(IFM/20A - ALL/FIN 1/REAL-TIME) Page 11 of 13 pages
08 FEB 10 16739.doc
Figure 14.- Newly Installed Fabric Boot. 5.1 Place Lower Clamp (flat edge against RHC Housing Lid) over RHC
grip and Fabric Boot with Lower Clamp ears aligned according to Figure 14.
Refer to Figures 13, 14. 5.2 Beginning on either side of RHC, position Lower Clamp so that it is
flush with RHC housing lid and gradually work around to opposite side.
Ensure that Fabric Boot lower hem protrudes evenly beneath Lower Clamp around entire perimeter.
Refer to Figure 14. 5.3 Alternately tighten fasteners (two) on Lower Clamp (Driver
Handle,1/4" Drive; 5/64" Hex Head, 1/4" Drive). Push down on Lower Clamp to ensure it is properly seated on RHC
housing lid. Refer to Figure 14. Photo document newly installed Fabric Boot in configuration similar
to Figure 14 (Digital Camera). 6. INSTALLING BEZEL
Figure 15.- Fully Installed Fabric Boot.
6.1 Deflect Rotation Hand Controller in all axes to ensure full range of
unobstructed motion. If necessary, loosen Lower Clamp and draw out additional fabric.
64
22-0638 (MSG 140) 3.2.711 ROTATION HAND CONTROLLER FABRIC BOOT INSTALLATION
(IFM/20A - ALL/FIN 1/REAL-TIME) Page 12 of 13 pages
08 FEB 10 16739.doc
6.2 Place bezel over RHC grip and Fabric Boot. Refer to Figure 15. 6.3 Retrieve fasteners and washers from Ziplock Bag. 6.4 Tighten non-captive fasteners (four), washers (four) to secure bezel to
RHC housing (Driver Handle,1/4" Drive; 1/8" Hex Head, 1/4" Drive).
7. REPLACING ROTATION HAND CONTROLLER 7.1 Position Rotation Hand Controller on Lower Support Structure
Assembly. Refer to Figure 5.
7.2 Tighten, torque fasteners (four) to 28 in-lbs [Driver Handle,
1/4" Drive; 1/8" Hex Head, 1/4" Drive; (10-50 in-lbs) Trq Wrench, 1/4" Drive].
7.3 W01RHP01 →|← J1 on Rotation Hand Controller
W01RHP02 →|← J2 on Rotation Hand Controller Refer to Figure 4.
7.4 If at LAB1S5 W1193-P4 →|← J3 on DCP 1J00138-1-P2 →|← J2 on DCP
1J00137-1-P1 →|← J1 on DCP Refer to Figure 3.
7.5 If at LAB1P5
W1293-P4 →|← J3 on DCP 1J00138-1-P2 →|← J2 on DCP
1J00137-1-P1 →|← J1 on DCP Refer to Figure 3.
7.6 Doff Static Wrist Tether. 8. CLOSEOUT 8.1 Notify MCC-H Go for RWS Powerup. 8.2 If required, G PCS power button → On 8.3 Check for FOD within 1 m area. 8.4 Photo document final configuration (Digital Camera). 8.5 Stow tools, materials.
65
22-0638 (MSG 140) 3.2.711 ROTATION HAND CONTROLLER FABRIC BOOT INSTALLATION
(IFM/20A - ALL/FIN 1/REAL-TIME) Page 13 of 13 pages
08 FEB 10 16739.doc
66
MSG 141 - MPC-DTV MUX CABLE SWAP OUT
END OF PAGE 1 OF 1, MSG 141
Replace the short (1 meter) backup MPC-DTV MUX cable that is currently installed and 1
connected between the MPC (DATA OUT PORT) and the DTV MUX CH 1 (RX PORT) with 2
the longer (3 meter) MPC –DTV MUX cable. Both cables were originally stowed at the 3
bottom of L10A1 with all other MPC hardware. 4
5
Continue to use the Channel 1 RX port on the MUX for all HD events including the FD 14 6
PAO event. Leave both Channels 0 and 2 rate select switches set to 1 and Channel 1 rate 7
select switch set to 8. 8
9
10
LEFT - 3 meter cable RIGHT - 1 meter cable (backup) 11
12
13
14
15
16
17
18
19
20
21
67
22-0749 (MSG 143) NODE 3 UIP CLOSEOUT INSTALLATION Page 1 of 3 pages
17 FEB 10
OBJECTIVE: Install UIP Closeouts on WRS-1, WRS-2, OGS, and ARS Racks in Node 3. LOCATION: NOD3D4, NOD3D5, NOD3A5, NOD3A4 DURATION: 75 minutes (15 minutes per rack, 30 minutes for WRS-2 rack in NOD3D4) CREW: One PARTS: NOD3A5 OGS Rack Closeout (P/N 96M35015-1, S/N 001) NOD3A4 ARS Rack Closeout (P/N 96M35016-1, S/N 001) NOD3D5 WRS1 Rack Closeout (P/N 96M35017-1, S/N 001) NOD3D4 WRS2 Rack Closeout (P/N 96M35018-1, S/N 001) MATERIALS: Gray Tape TOOLS: Digital camera
NOTE 1. This procedure can be run as a stand-alone procedure for each
individual Rack. 2. All directional references (up, down, left, and right) are with respect to
the front face of the Rack (facing the rack) 3. The bottom attachment pieces of the UIP closeout are not being flown
and do not need to be installed, and so are colored over in Figure 1.
68
22-0749 (MSG 143) NODE 3 UIP CLOSEOUT INSTALLATION Page 2 of 3 pages
17 FEB 10
1. INSTALLING QUARTER TURN FASTENER
Figure 1. UIP Closeout in Fully Installed Configuration, View From
Front of the Rack Looking into UIP Area.
Table 1. UIP Closeout Locations, Ops Nom, and P/Ns Location [A] Ops Nom [B] P/N [C] NOD3A5 NOD3A5 OGS Rack Closeout 96M35015-1 NOD3A4 NOD3A4 ARS Rack Closeout 96M35016-1 NOD3D5 NOD3D5 WRS1 Rack Closeout 96M35017-1 NOD3D4 NOD3D4 WRS2 Rack Closeout 96M35018-1
[A] 1.1 Install [B] UIP Closeout (P/N [C]), quarter turn fasteners (two) Refer to Figure 1. 2. UIP CORNER ENGAGEMENT
Figure 2. Rack UIP Area Without Closeout Installed.
2.1 Align left UIP Corner Velcro with angled surface below left Lower
Launch restraint Refer to Figures 1 and 2.
Quarter Turn Fasteners (Shown covered)
Upper UIP Closeout Velcro
UIP Corner Velcro
UIP Corner Velcro
UIP Corner Velcro installs here UIP Corner Velcro installs here
Up
Down
Left Right
Up
Down
Left Right
Upper Rack UIP Velcro installs here
69
22-0749 (MSG 143) NODE 3 UIP CLOSEOUT INSTALLATION Page 3 of 3 pages
17 FEB 10
2.2 Remove backing from velcro at the left UIP Corner Velcro. Firmly press backing onto angled surface below left Lower Launch
Restraint. 2.3 Repeat steps 2.1 and 2.2 for right UIP Corner Velcro. 3. TOP UIP CLOSEOUT ENGAGEMENT 3.1 Align Upper UIP Closeout Velcro with top of rack UIP. Refer to Figures 1 and 2. 3.2 Remove backing from velcro on Upper UIP Closeout Velcro. Firmly press backing onto top of rack UIP. 3.3 If outfitting WRS-2 Rack in NOD3D4 location: Cover both the front side and back side of Rack UIP Closeout holes not used for routing umbilicals with gray tape. 4. CLOSEOUT 4.1 Photo document newly installed hardware (Digital Camera). 4.2 Check for FOD around work area within 3’ radius. 5. CONTINUING OUTFITTING OF REMAINING RACKS
Repeat steps 1 to 3 until all racks in NOD3D4, NOD3D5, NOD3A5, and NOD3A4 are outfitted.
6. POST OUTFITTING
Notify MCC-H that Node 3 UIP closeout outfitting activity is complete.
70
22-0752 (MSG 144) 1.154 OGS RACK TRANSFER LAB TO NODE 3 (ASSY OPS/20A/FIN 2/REAL-TIME) Page 1 of 16 pages
17 FEB 10
OBJECTIVE: Transfer Oxygen Generation System (OGS) Rack from LAB1P1 to NOD3A5. This transfer activity demates all Rack umbilicals, releases K-BARs and Pivot Mechanisms, transfers the Rack from the LAB and then structurally attaches the Rack to the Node 3 module. Rack umbilicals will be subsequently remated using a separate procedure. LOCATION: Stowed: LAB1P1 Installed: NOD3A5 DURATION: 1 hour, 55 minutes
10 minutes - Prep Rack Bay 45 minutes - Demate Jumpers 30 minutes - Transfer 30 minutes - Install in Node 3, Closeout
CREW: Two (second crewmember required for transfer only) PARTS: 3.0 CTB labeled “WRS and OGS Lab Mod Kit Jumpers” Ziplock Bag labeled “Node 3 Miscellaneous” Ziplock Bag labeled “OGS Jumper Electrical Plugs” Ziplock Bag labeled “OGS Jumper Fluid Plugs” Ziplock Bag labeled “WHC/OGS Potable Water QD Caps” Ziplock Bags (As required to replace Caps/Plugs) Gray Tape MATERIALS: Dry Wipes AMP Pallet 3, A3 (SEG52101140-301) (if required) Povidone Iodine Pads (P/N 08486A7) TOOLS: Digital Camera ISS IVA Toolbox: Drawer 2: Driver Handle, 3/8” Drive
Ratchet, 3/8" Drive 9/16" Socket, 3/8" Drive 5/32" Hex Head, 3/8" Drive Ratchet, 1/4" Drive 6" Ext, 1/4" Drive 5/16" Socket, 1/4" Drive (5-35 in-lbs) Trq Driver, 1/4" Drive (40-200 in-lbs) Trq Wrench, 3/8" Drive
Drawer 3: 6" long, 3/8" Hex Head, 3/8" Drive
71
22-0752 (MSG 144) 1.154 OGS RACK TRANSFER LAB TO NODE 3 (ASSY OPS/20A/FIN 2/REAL-TIME) Page 2 of 16 pages
17 FEB 10
Drawer 4: Wire Cutters Adjustable Joint Pliers, Straight Jaw
Drawer 5: Static Wrist Tether
NOTE All directional references (up, down, left, right) are with respect to front face of OGS, as you face Rack, with feet oriented towards the pivot point.
1. SAFING
LAB1P1 1.1 √sw RACK POWER – OFF PCS 1.2 US Lab: EPS Rack Power: Rack Power 1
Rack Power 1‘Rack LAB1P1’
Verify Switch Position – Off Verify Switch Avail – Yes Verify Monitoring Status – Ena
1.3 √MCC-H to verify Rack power safing in place:
Either DDCU LA1A or DDCU LA4A converter Off, and RPCM LA1A4A A RPC 2 Open, Close Cmd Inhibited, and RPCM LA2B C RPC 3 Open, Close Cmd Inhibited.
1.4 √MCC-H to verify system is safed, thermal clock expired, and H2 Vent
Valve closed 2. RACK TRANSLATION PREPARATION
NOTE Umbilicals restrained on Node 3 Standoff need to be released to prevent interference with Rack during installation.
72
22-0752 (MSG 144) 1.154 OGS RACK TRANSFER LAB TO NODE 3 (ASSY OPS/20A/FIN 2/REAL-TIME) Page 3 of 16 pages
17 FEB 10
Figure 1.- NOD3A5 Umbilicals in Launch Restraint.
NOD3A5 2.1 Release Umbilicals from Launch Restraints by cutting Zip Ties (two
per umbilical; Wire Cutters). Release Ground Strap by cutting Zip Ties (two). Refer to Figure 1.
2.2 Remove connector support brackets (two; four fasteners each) (Driver Handle, 3/8” Drive; 5/32" Hex Head).
Stow in Ziplock Bag labeled, “Node 3 Miscellaneous.” Refer to Figure 1. 2.3 √K-BAR Capture Mechanisms installed on Ovhd-Aft standoff. √ARIS - Pivot Fitting Bottom Left (inside) (P/N 683-61711-31) installed
on Aft-Deck standoff. LAB1P1 2.4 √All unnecessary equipment protruding into rack translation path has
been removed, stowed (US LAB, Node 1, Node 3) 2.5 If installed, remove ARIS Microgravity Rack Barrier from Mounting
Posts, latches (two). Unscrew, remove Mounting Posts (two) from Standoff closest to OGS.
Temporarily stow. 2.6 Remove any hardware or Handrails from the face of the Rack.
Connector Support Brackets (two; four fasteners each)
73
22-0752 (MSG 144) 1.154 OGS RACK TRANSFER LAB TO NODE 3 (ASSY OPS/20A/FIN 2/REAL-TIME) Page 4 of 16 pages
17 FEB 10
Figure 2.- OGS Rack Utility Interface Panel.
Figure 3.- LAB1P1 Modified Z-Panel.
NOTE The Feed Water Hose in the Standoff did not fit through the Z-Panel cutout, it was routed around the Z-Panel instead.
TCS SUPPLY
TCS RETURN
CO2
J1 PWR
120 VDC 6KW
J2 PWR
120 VDC 3KW
J3 DATA
J4 1553
BUS A
J5 1553
BUS B FEED
WATER H2/N2
WASTE GAS
N2 WASTE WATER CO2/CH4 WASTE GAS
TCS MOD SUPPLY TCS MOD RETURN
J2 J1 J43 J13 J3
TCS LOW SUPPLY GN2
J16 J7 J14 J4 J53 J47 J46
TCS LOW RETURN H2/N2 WASTE GAS
FEED WATER WASTE WATER
WASTE GAS
74
22-0752 (MSG 144) 1.154 OGS RACK TRANSFER LAB TO NODE 3 (ASSY OPS/20A/FIN 2/REAL-TIME) Page 5 of 16 pages
17 FEB 10
To WHC UIP
OGS RackFace
Current Config
WHC Flushwater Jumper
(P/N 683‐63461‐26)
OGS Feed Water Jumper(P/N 683‐63461‐8)Feed Water Hose
FEED WATER
Figure 4.- OGS Water System Connections.
3. DEMATING POTABLE WATER UMBILICALS Refer to Figures 2 to 4.
3.1 At any point in this procedure, if QD caps or plugs are not available,
cover QD with Ziplock Bag and secure with Gray Tape. LAB1P1 3.2 Remove UIP Closeout from Rack, 1/4 Turn fasteners (two).
WARNING Contact with the wetted surfaces of the potable water system QDs can lead to contamination and crew illness.
3.3 If contact made with wetted surface of Potable Water QD, clean
surface (Povidone Iodine Pads). 3.4 Retrieve Potable Water Plug from PWD:
1/2" QD Plug ←|→ 1/2" QD Cap, tethered to PWD Inlet
NOTE The OGS Feed Water Jumper will stay with the rack during transfer.
75
22-0752 (MSG 144) 1.154 OGS RACK TRANSFER LAB TO NODE 3 (ASSY OPS/20A/FIN 2/REAL-TIME) Page 6 of 16 pages
17 FEB 10
3.5 Demating WHC Flush Water Jumper (Figure 4) 3.5.1 WHC Flush Water Jumper TO: OGS FEED WATER
JUMPER ←|→ OGS Feed Water Jumper TO: OGS FEED WATER
1/2" QD Cap, tethered →|← WHC Flush Water Jumper TO: OGS FEED WATER JUMPER
1/2" QD Plug (From Ziplock Bag labeled “WHC/OGS Potable Water QD Caps”) →|← OGS Feed Water Jumper TO: OGS FEED WATER
Temporarily secure OGS Feed Water Jumper for rack transfer.
3.5.2 WHC Flush Water Jumper TO: LAB1P1 FEED WATER
QD ←|→ FEED WATER HOSE (routed past Z-Panel from Standoff)
1/2" QD Plug (From PWD) →|← WHC Flush Water Jumper labeled TO: LAB1P1 FEED WATER QD
1/2" QD Cap (tethered to Z-Panel) →|← FEED WATER HOSE
3.6 Stow WHC Flush Water Jumper in 3.0 CTB labeled “WRS and OGS
Lab Mod Kit Jumpers.”
76
22-0752 (MSG 144) 1.154 OGS RACK TRANSFER LAB TO NODE 3 (ASSY OPS/20A/FIN 2/REAL-TIME) Page 7 of 16 pages
17 FEB 10
Figure 5.- OGS Waste Water Jumper (P/N 683-63461-7) - Check Valve Not Shown.
4. DEMATING WASTE WATER UMBILICAL
Refer to Figure 5. 4.1 OGS Waste Water Jumper labeled TO: OGS Waste Water ←|→
WASTE WATER on Rack UIP
Demate from Z-Panel (Step 4.2)
Demate from OGS UIP (Step 4.1)
Will be installed in Node 3
Demate QD (Step 4.3)
77
22-0752 (MSG 144) 1.154 OGS RACK TRANSFER LAB TO NODE 3 (ASSY OPS/20A/FIN 2/REAL-TIME) Page 8 of 16 pages
17 FEB 10
4.2 OGS Waste Water Jumper labeled TO: OGS Waste Water ←|→ WASTE WATER on Z-Panel
4.3 Green flex hose ←|→ metal line Install plugs from Ziplock Bag “OGS Jumper Fluid Plugs” or tethered
to the Z-Panel. 4.4 Stow green flex hose in 3.0 CTB labeled “WRS and OGS Lab Mod
Kit Jumpers.” 4.5 Temporarily stow remaining portion of OGS Waste Water Jumper
(Check Valve, ACTEX filter, and metal-braided hose) for later installation in Node 3.
5. DEMATING REMAINING FLUID UMBILICALS Refer to Figures 2 and 3.
WARNING OGS Rack Data Jumper must be removed last to ensure proper operation of Rack Power Switch. Failure to comply could result in electrical shock hazard.
Table 1. OGS Fluid Jumpers
OGS Rack Jumper P/N Z-Panel Connector Rack Connector
OGS MTL Supply Jumper 683-63461-4 TCS MOD SUPPLY TCS
SUPPLY
OGS MTL Return Jumper 683-63461-5 TCS MOD RETURN TCS RETURN
OGS Nitrogen Jumper 683-63461-6 GN2 N2 OGS H2/N2 Vent Jumper 683-63461-9 H2/N2 WASTE GAS H2/N2 WASTE GAS
5.1 Remove fluid jumpers, demating both ends. Refer to Table 1. 5.2 Install caps and plugs from Ziplock Bag “OGS Jumper Fluid Plugs”
or tethered to the Z-Panel. 5.3 Stow Jumpers in 3.0 CTB labeled “WRS and OGS Lab Mod Kit
Jumpers.” 6. DEMATING ELECTRICAL UMBILICALS PART 1
Refer to Figures 2 and 3.
78
22-0752 (MSG 144) 1.154 OGS RACK TRANSFER LAB TO NODE 3 (ASSY OPS/20A/FIN 2/REAL-TIME) Page 9 of 16 pages
17 FEB 10
Table 2. OGS Electrical Jumpers OGS Rack Jumper P/N Z-Panel Connector Rack Connector
OGS Rack Pri Pwr Jumper 683-95134-1 J1
J1 PWR 120 VDC
6KW
OGS Rack Sec Pwr Jumper 683-95135-1 J2
J2 PWR 120 VDC
3KW OGS Rack 1553A
Y-Jumper 683-95112-1J3 - Do Not Demate J4
J13 - Do Not Demate 1553 BUS A OGS Rack 1553B
Y-Jumper 683-95113-1J4 - Do Not Demate J5
J14 - Do Not Demate 1553 BUS B
6.1 Don Static Wrist Tether. Secure to unpainted, unannodized metal surface. 6.2 Demate electrical jumpers, per Table 2. Do not demate OGS Rack Data Jumper at this time. Demate 1553 Jumpers from Rack UIP only, leave connected to Z-
Panel 6.3 Install electrical caps from Ziplock Bag labeled “OGS Jumper
Electrical Plugs.” 6.4 Stow Jumpers in 3.0 CTB labeled “WRS and OGS Lab Mod Kit
Jumpers.”
7. DEMATING ELECTRICAL UMBILICALS PART 2 Refer to Figures 2 and 3.
NOTE RPS Switch Position will show “On” on PCS display when Rack Data Jumper is demated.
Table 3. OGS Electrical Jumper
OGS Rack Jumper P/N Z-Panel Connector Rack Connector
OGS Rack Data Jumper 683-95136-1 J43
J3 J53
7.1 Demate OGS Rack Data Jumper, demating both ends. Refer to Table 3. 7.2 Install electrical caps from Ziplock Bag labeled “OGS Jumper
Electrical Plugs.” 7.3 Doff Static Wrist Tether.
79
22-0752 (MSG 144) 1.154 OGS RACK TRANSFER LAB TO NODE 3 (ASSY OPS/20A/FIN 2/REAL-TIME) Page 10 of 16 pages
17 FEB 10
7.4 Stow OGS Rack Data Jumper in 3.0 CTB labeled “WRS and OGS Lab Mod Kit Jumpers.”
Temporarily stow CTB. 8. SAFING AND REMOVING SMOKE DETECTOR MCC-H/ 8.1 Deactivating and Safing Smoke Detector PCS LAB Fire Display
‘Smoke Detectors’
sel PD1
LAB1 PD1Smoke Detector‘Monitoring’
cmd Inh
√Status – Inhibited
sel RPCM_LA1B_H_RPC_03
RPCM_LA1B_H_RPC_03
cmd RPC Position – Open (Verify – Op) cmd Close Cmd – Inhibit (Verify – Inh)
LAB1PD1 8.2 Removing Smoke Detector 8.2.1 P1-W3360 ←|→ J1 8.2.2 Remove Fasteners (four) securing Smoke Detector Bracket to
Standoff (Ratchet, 1/4" Drive; 6" Ext, 1/4" Drive; 5/16" Socket, 1/4" Drive).
8.2.3 Cover connector plug, jack (small Ziplock Bag, Gray Tape). 8.2.4 Temporarily stow.
80
22-0752 (MSG 144) 1.154 OGS RACK TRANSFER LAB TO NODE 3 (ASSY OPS/20A/FIN 2/REAL-TIME) Page 11 of 16 pages
17 FEB 10
Figure 6.- Location of Rack Restraint Hardware.
Figure 7.- Lower Launch Restraint, Left Side.
9. PIVOT MECHANISM KNOB DISENGAGEMENT Refer to Figures 6 and 7.
9.1 Loosen Pivot Mechanism Knob one turn. Snug in down position so Rack is free to lift off Pivot Fitting. 9.2 Repeat disengagement for opposite side.
Pivot Mechanism Knob
Locking Screw (non-captive)
Pivot Latch (inside of slot)
Lower Launch
Restraint Access Hole
Refer to Figure 8, Step 10
Refer to Figure 7, Step 9
81
22-0752 (MSG 144) 1.154 OGS RACK TRANSFER LAB TO NODE 3 (ASSY OPS/20A/FIN 2/REAL-TIME) Page 12 of 16 pages
17 FEB 10
Figure 8.- K-BAR Shown Installed, Left Side.
10. K-BAR DISENGAGEMENT
Refer to Figures 6 and 8. 10.1 Disengage Rack K-BAR Thumb Latches (two) from Standoff. 10.2 Rotate Rack down to a controlled stop.
Figure 9.- Side View of Rotated Rack, Showing Rack Ground Strap Location.
K-BAR Capture Mechanism
K-BAR Thumb Latch
Locking Screw
K-BAR GSE Boss Fastener
Pinion
Ground Strap Attachment Fastener
Ground Strap
Bottom of Rack
82
22-0752 (MSG 144) 1.154 OGS RACK TRANSFER LAB TO NODE 3 (ASSY OPS/20A/FIN 2/REAL-TIME) Page 13 of 16 pages
17 FEB 10
Figure 10.- Rack Ground Strap Cross Section.
11. REMOVING GROUND STRAP
Refer to Figures 9 and 10. 11.1 Fully retract Adjustment Nut towards head of Attachment
Fastener (Adjustable Joint Pliers, Straight Jaw). 11.2 Ground Strap ←|→ Rack, 1/4-Turn Attachment Fastener (Ratchet,
3/8" Drive; 9/16" Socket, 3/8" Drive). 11.3 Stow Ground Strap into Standoff location. 12. TRANSFERRING OGS TO NODE 3 12.1 Lift Rack off of Pivot Fittings. 12.2 Loosen Mechanism Knobs one turn so they are free to move.
Refer to Figure 7.
12.3 Remove ARIS - Pivot Fitting Bottom Right (outside) (P/N 683-61711-34) from lower standoff (Ratchet, 3/8" Drive; 6" Long, 3/8" Hex Head, 3/8" Drive)
12.4 Transfer OGS Rack and Pivot Fitting to NOD3A5. 12.5 Install, torque ARIS - Pivot Fitting Bottom Right (outside), fastener
(one) to 150 in-lbs [Ratchet, 3/8" Drive; 6" Long, 3/8" Hex Head; (40-200 in-lbs) Trq Wrench, 3/8" Drive].
NOD3A5 12.6 With Node 3 Umbilicals routed toward the front of the rack, align
Rack onto Standoff until Rack Pivot Latches engage standoff Pivot Fittings.
Keep Rack rotated down.
12.7 Tighten both Pivot Mechanism Knobs in latched, up position. 13. INSTALLING GROUND STRAP 13.1 Inspect Ground Strap contact surfaces for debris, clean if required
(Dry Wipes).
Rack Structure
1/4-Turn Attachment Fastener (Use 9/16" Socket)
Adjustment Nut (1-1/8") (Use Adjustable Joint Pliers)
Ground Strap Springs
83
22-0752 (MSG 144) 1.154 OGS RACK TRANSFER LAB TO NODE 3 (ASSY OPS/20A/FIN 2/REAL-TIME) Page 14 of 16 pages
17 FEB 10
13.2 Fully retract Adjustment Nut (towards head of Attachment Fastener), by hand.
Refer to Figure 9. 13.3 Ground Strap →|← Rack, 1/4-Turn Attachment Fastener (Ratchet,
3/8" Drive; 9/16" Socket, 3/8" Drive). Refer to Figures 9 and 10.
13.4 Snug Adjustment Nut , until firm against Springs. 13.5 Tighten Adjustment Nut an additional 1/2 to 3/4 turn (Adjustable
Joint Pliers, Straight Jaw). 13.6 Photo document installed Ground Strap (Digital Camera). 14. FINAL INSTALLATION 14.1 √Rack rotation path is unobstructed 14.2 K-BAR Thumb Latches (two) → up position
Refer to Figure 8.
Figure 11.- K-BAR Capture Mechanism.
14.3 Slowly rotate Rack up to a controlled stop.
Engage Rack K-BAR Thumb Latches (two) in K-BAR Capture Mechanism located on upper Standoff.
* **************************************************************************** * * ******
If K-BAR does not align with Capture Mechanism: Loosen Adjustment Fastener (Ratchet, 3/8" Drive; 5/32" Hex Head, 3/8" Drive).
Slide capture clip left or right, as required to engage K-BAR. Once K-BAR engaged, re-tighten Adjustment Fastener (Ratchet, 3/8" Drive; 5/32" Hex Head, 3/8" Drive).
Refer to Figure 11.
* **************************************************************************** 15. REINSTALLING SMOKE DETECTOR LAB1PD1 15.1 Remove Ziplock Bag, Gray Tape, from connectors. 15.2 P1-W3360 →|← J1
Adjustment Fastener
84
22-0752 (MSG 144) 1.154 OGS RACK TRANSFER LAB TO NODE 3 (ASSY OPS/20A/FIN 2/REAL-TIME) Page 15 of 16 pages
17 FEB 10
15.3 Install Smoke Detector Bracket on standoff, fasteners (four) (Ratchet, 1/4" Drive; 6" Ext, 1/4" Drive; 5/16" Socket, 1/4" Drive).
15.4 Tighten, torque Fasteners (four) to 22 in-lbs [Ratchet, 1/4" Drive;
6" Ext, 1/4" Drive; 5/16" Socket, 1/4" Drive; (5-35 in-lbs) Trq Driver, 1/4" Drive].
16. POST TRANSFER 16.1 Notify MCC-H smoke detector installed. NOD3A5 16.2 Photo document OGS in Node 3 and LAB1P1 Z-Panel (Digital
Camera).
OGS Feed Water Jumper(P/N 683‐63461‐8)
OGS Feedwater Adapter Hose
(P/N 683‐64435‐7)
Water Delivery System
POT/DEL
POT TO WD
CWC‐to‐3/4” Female QD Adapter
(P/N SEG33119914‐301)
WD Cntrl Power Cable
(P/N 96M23039‐1)
Water Delivery Supply Hose
(P/N SEG33119485‐301)
Figure 12.- WDS Stowage Configuration.
NOTE
The OGS Feed Water Jumper will now be demated from the rack and stowed with the Water Delivery System (WDS).
16.3 On MCC-H GO: OGS Feed Water Jumper ←|→ FEED WATER on OGS Rack Refer to Figure 4.
85
22-0752 (MSG 144) 1.154 OGS RACK TRANSFER LAB TO NODE 3 (ASSY OPS/20A/FIN 2/REAL-TIME) Page 16 of 16 pages
17 FEB 10
16.4 √MCC-H for stowage location of Water Delivery System (WDS). WDS 1/2” QD Cap, tethered ←|→ OGS Feedwater Adapter Hose OGS Feed Water Jumper →|← OGS Feedwater Adapter Hose Secure hoses to Water Delivery System. Refer to Figure 12. 16.5 If removed in step 2.5, install Mounting Posts (two) on Standoff
closest to OGS. Install ARIS Microgravity Rack Barrier on Mounting Posts, latches
(two). 16.6 Notify MCC-H transfer activity complete.
Stow tools, materials, parts.
Table 4. Restow Table OpNom P/N
WHC Flush Water Jumper 683‐63461‐26 OGS Rack Data Jumper 683-95136-1 OGS Rack Pri Pwr Jumper 683-95134-1 OGS Rack Sec Pwr Jumper 683-95135-1 OGS MTL Supply Jumper 683-63461-4 OGS MTL Return Jumper 683-63461-5 OGS Nitrogen Jumper 683-63461-6 OGS H2/N2 Vent Jumper 683-63461-9 OGS Waste Water Jumper (Green Flex Hose) 683-63461-7 OGS Waste Water Jumper (ACTEX Hose) OGS Feed Water Jumper 683-63461-8
86
MSG 145 - FD11 CREW CHOICE DOWNLINK
1
TDRS AOS LOS Delta (min) Notes W-171 9/23:47 10/00:13 26 E-275 10/01:11 10/01:21 10 Gimbal flip at 01:20; Analog only W-171 10/01:27 10/01:54 27
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
Note: Please notify MCC-H 10 minutes prior to the event to allow for ground network configuration.
END OF PAGE 1 OF 1, MSG 145 87
22-0761 (MSG 146) – FD11 EVA Deltas Page 1 of 1
Page 1 of 1, 22-0761 (MSG 146)
Bob, Nick, and Steve, 1
Amazing job on all three of your EVAs. The team is thrilled with the tremendous 2
work you performed. Thank you for making us all look so good. 3
1. You can expect a new POST EVA RECONFIG AND TRANSFER 4
PROCEDURE for you to work from due to all the suit items changing around 5
and several task items being added/deleted as well. Ref Msg 142 (22-0758). 6
2. The engineering team met to discuss Bob’s report of water droplets in the 7
helmet for EMU 3005. It was decided that the water was a product of nominal 8
sublimator carryover as seen during ground testing - meaning that the slurper 9
doesn’t quite remove all the water in the sublimator, and the excess carries 10
over into the vent loop. They are discussing ways of drying out the vent loop, 11
but consider the EMU operating nominally and it will stay on ISS. 12
3. EVA ISS A/L TOOL STOW ref. Msg 139 (22-0738): 13
• Currently have 2.0 hours for MS3 and MS4 on FD11 and 2.5 hours 14
for MS3, MS4, and FE6 on FD12. 15
• Since the ISS crew likes to be present for any hardware stowage, 16
we would like you to start on the following steps in the 20A EVA 17
Tool Restow & 19A Tool Config.xls: 18
o Steps 1 thru 7 19
o Step 8, Tables A thru G only 20
o You can leave Step 8 Table H and step 9 for FD12 when 21
TJ is there 22
23
4. Due to an LOS, we missed the Torque and Turns for OIH 0612. Can you 24
voice those down for us? 25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
88
MSG 148 - FD11 REBOOST PROCEDURE
1
2 3
FD11 REBOOST - VRCS, CONFIG 3 NOTE 4
5 6 7 8 9
10 11 12
Allow 5 min between establishing reboost attitude and reboost start time for DAP accelerations to converge. Steps 1-2 may be performed prior to completion of maneuver to reboost attitude.
1. Select Reboost Configuration
GNC 20 DAP CONFIG
13 REBOOST CFG – ITEM 8 + 3 EXEC 14 INTVL – ITEM 9 + 2 EXEC 15
16 17 18
2. Set up Future Reboost
GNC UNIV PTG 19
DURATION – ITEM 27 + 0 + 3 3 + 0 EXEC 20 START TIME – ITEM 1 + 9 + 2 2 + 1 7 + 0 EXEC 21
22 23 24 25 26 27 28 29
RBST – ITEM 25 EXEC (FUT-*)
3. Select appropriate Reboost Rotation DAP
When in attitude and prior to START TIME,
C3 DAP: A11/AUTO/VERN
NOTE 30 31 32 33 34 35 36 37 38 39 40 41
42
43
44
45
46
47
Reboost can be aborted with an Item 26 on UNIV PTG or by Selecting FREE on the DAP
4. Post Reboost Configuration C3 DAP: A12/AUTO/VERN
Return to FLIGHT PLAN Attitude
END OF PAGE 1 OF 1, MSG 148 89
MSG 149B - LIOH CUE CARD READY FOR UPLINK
1
2
3 4 5 6 7 8 9
10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34
130 FLIGHT DAY 3 DOCKING
ORBITER with ISS CO2 ABSORBER REPLACEMENT
(6 crewmembers/Single Shift/FD 10-18)
FLIGHT DAY POS A POS B CK CMPLT POST FD10 " " EVA3
PRE FD10 19 "
POST FD11 " “ Extra Docked Day
PRE FD11 “ 13
POST FD12 “ “
MID FD12 STS-128 ___ STS-128 ___ ODS HATCH CL
PRE FD12 “ "
POST FD13 STS-128 ___ STS-128 ___* UNDOCK
PRE FD13 " STS-128 ___
POST FD14 STS-128 ___* STS-128 ___
PRE FD14 33 "
POST FD15 34 35* EOM
PRE FD15 " 36
POST FD16 37* 38 EOM+1
PRE FD16 39 "
POST FD17 40* 41 EOM+2
PRE FD17 14 "
POST FD18 17 31 EOM+3 *Re-bag and seal LiOH cans w/ Gray Tape and stow.
NOTE 35
36 37 38 39 40 41 42 43 44 45 46 47 48 49
This card is specifically used for the STS-130 mission with the orbiter conducting single shift ops with a shuttle crew size of 6 and an ISS crew size of 5. Changeout scheme reflects FD3 docking with ISS, Vozdukh and CDRA (activated in dual-bed mode) during docked ops, and undocking on FD13. ODS hatch closure will be worked the night before undocking.
END OF PAGE 1 OF 1, MSG 149B 90
STS‐130 Po
st EVA
#3 EV1 Left Glove
Are
a of
inte
rest
to ta
rget
for i
nspe
ctio
n an
d po
ssib
le p
hoto
Pos
sibl
e co
ntam
inat
ion
or
Vect
ran
Dam
age
22-0
764
(MSG
154
) - P
ost E
VA 3
EV-
1 G
love
Are
a of
Inte
rest
Pa
ge 1
of 1
Page
1 o
f 1, 2
2-07
64 (M
SG 1
54)
91