ENGR. MARIANO V JOSEPH JR., PEEChief, Fire Safety Enforcement Division
Bureau of Fire Protection, National Headquarters
INTRODUCTION On
FIRE AND LIFE SAFETY ASSESSMENT REPORT
( L R
)
8/9/2019 FALAR Introduction
2/18
8/9/2019 FALAR Introduction
3/18
BFP VISION
A MODERN FIRE
PROTECTION AGENCY WORKINGTOWARDS A SAFE
AND PROGRESSIVE SOCIETY
8/9/2019 FALAR Introduction
4/18
8/9/2019 FALAR Introduction
5/18
The IRR of RA 9514 covers the following:
A. All persons;B. All private or public buildings, facilities or
structures and their premises erected or
constructed before and after the effectivity hereof;
C. Design and installation of mechanical, electronics
and electrical systems relative to fire protection;
D. Manufacturing, storage, handling and/or use, and
transportation of explosives and/or combustible,
flammable liquids and gases, toxic and other
hazardous materials and operations, and their
wastes;
8/9/2019 FALAR Introduction
6/18
E. Fire safety planning, design, construction, repair,
maintenance, rehabilitation and demolition;
F. Fire protective and warning equipment orsystems;
G. All land transportation vehicles and equipment,
ships or vessels docked at piers or wharves or
anchored in seaports; and
H. Petroleum industry installations.
The IRR of RA 9514 covers the following:
8/9/2019 FALAR Introduction
7/18
CHRONOLOGICAL EVENTS OF FALAR
24 April 2003 - Meeting of BFP, RADIAN and USPS to discuss
FALAR
03 June 2003 - Meeting between DILG-BFP and RADIAN
07 July 2003 - Bureau (BFP) Order No. 2003-1149 Creating thecommittee on FALAR
26 March 2004 - SOPI Endorsement on FALAR
17 March 2005 - Sectoral Consultation on the Implementation of
FALAR
15 December 2005 - DILG Memo Circular 2005-143
18 November 2009 - Effectivity of IRR’s RA 9514
8/9/2019 FALAR Introduction
8/18
CHRONOLOGICAL EVENTS OF FALAR
24 April 2003 - Meeting of BFP, RADIAN and USPS to discuss
FALAR
03 June 2003 - Meeting between DILG-BFP and RADIAN
07 July 2003 - Bureau (BFP) Order No. 2003-1149 Creating the
committee on FALAR
26 March 2004 - SOPI Endorsement on FALAR
17 March 2005 - Sectoral Consultation on the Implementation of
FALAR
15 December 2005 - DILG Memo Circular 2005-143
18 November 2009 - Effectivity of IRR’s RA 9514
8/9/2019 FALAR Introduction
9/18
* The National Building Code (NBC, PD 1096)was enacted on February 19, 1977
* The Fire Code of the Philippines (FCP, PD 1185)
was enacted on August 26,1977
* Memorandum of Agreement (MOA) August 1,
1978 between;
- Ministry of National Defense (now Department of theInterior and Local Government)
- Ministry of Public Works/Transportation and
Communications (now Department of Public Works and
Highway)
BACKGROUND
8/9/2019 FALAR Introduction
10/18
•In the MOA the life of the building is divided
into 3 phases:
Pre-Construction Phase Construction Phase
Post Construction Phase
BACKGROUND
8/9/2019 FALAR Introduction
11/18
• Two (2) days plan review
• Effective Code Compliance
• Highly reliable
• Better appreciation and understanding
• More efficient regular annual inspection
Benefits of the Fire and Life Safety AssessmentReport (FALAR)
8/9/2019 FALAR Introduction
12/18
*A written report prepared and certified by the Architect and his Fire SafetyPractitioner.
*The report shall have three (3) parts: Part 1- Pre-Construction Phase
Part 2- Construction Phase Part 3- Post Construction Phase
*FALAR Part 1 is a compilation of plans/specifications and designapproach, criteria and calculations.
*FALAR Part 2 is a compilation of all approved submittals, test andacceptance forms of all fire protection and life safety features.*FALAR Part 3 is a compilation of the maintenance and testing records
kept by the buildings engineering and maintenance departments.
What is a Fire and Life Safety
Assessment Report (FALAR) ?
8/9/2019 FALAR Introduction
13/18
A. All private and public buildings, facilities and structures to beconstructed or being constructed upon effectivity of this IRR shall berequired to submit FALAR 1 and 2 among other documents to theCity /Municipal Fire Marshal having jurisdiction as one of therequirements for securing FSEC or FSIC for the issuance of BuildingPermit and Occupancy Permit. (SECTION 9.0.3.1A. IRR’s RA 9514)
B. All existing private and public buildings, facilities or structures withoccupancy of at least (50) persons shall be required to submit
FALAR 3 annually to the City/Municipal Fire Marshal having jurisdiction when securing FSIC. (SECTION 9.0.3.1B. IRR’s RA 9514)
Applicability
8/9/2019 FALAR Introduction
14/18
Pre-Construction Phase
3 sets FALAR Part 1
Architect and Fire Safety Practitioner
Fire Safety Evaluation Clearance (FSEC)
Building Permit
When will the submission of FALAR be required ?
8/9/2019 FALAR Introduction
15/18
Construction Phase
3 sets FALAR Part 2
Construction Manager and Contractor
Fire Safety Inspection Certificate (FSIC)
Occupancy Permit
When will the submission of FALAR be required ?
8/9/2019 FALAR Introduction
16/18
Post Construction Phase
3 sets FALAR Part 3
Building Administrator
Fire Safety Inspection Certificate (FSIC)
Business Permit
When will the submission of FALAR be required ?
8/9/2019 FALAR Introduction
17/18
• BFP Personnel do not have access to vital fire safety
documents which includes but are not limited to the basis of
design, design approach, calculations, as – built plans,
records of testing, commissioning and maintenance.
• BFP Personnel involved in review plans and specifications
and fire safety inspection have not cope up with the growth
of fire protection and life safety technology.
• Major violations of the fire safety provisions are difficult to
discover by the BFP Personnel because of incomplete
submission of vital fire protection and life safety documents
by the designers, construction managers and building
administrator.