If you can't read please download the document
Upload
keita
View
25
Download
0
Embed Size (px)
DESCRIPTION
Fairbanks Areawide Industrial Reclamation Project AREA HISTORY Janice Wiegers ADEC. Area History. 1989-1990 DOT plans Minnie Street Connector S&W investigate surface soil, subsurface soil, and groundwater Widespread contamination stops project (petroleum, solvents, metals, PCBs) - PowerPoint PPT Presentation
Citation preview
Fairbanks Areawide Industrial Reclamation Project
AREA HISTORY
Janice WiegersADEC
Area History1989-1990 DOT plans Minnie Street ConnectorS&W investigate surface soil, subsurface soil, and groundwater Widespread contamination stops project (petroleum, solvents, metals, PCBs)
1993-1996 MSLUG Project - Railroad and ~15 RPs USGS investigates groundwater characteristics and quality Primary focus is public drinking water wells on other site of the Chena River 2002 2004ADEC begins FAIR project (larger than MSLUG)2002 Well point investigation conducted and coordinated sampling begins2003 Risk Management Workplan completed by EPA
Area History1989-1990 DOT plans Minnie Street ConnectorS&W investigate surface soil, subsurface soil, and groundwater Widespread contamination stops project (petroleum, solvents, metals, PCBs)
1993-1996 MSLUG Project - Railroad and ~15 RPs USGS investigates groundwater characteristics and quality Primary focus is public drinking water wells on other site of the Chena River 2002 2004ADEC begins FAIR project (larger than MSLUG)2002 Well point investigation conducted and coordinated sampling begins2003 Risk Management Workplan completed by EPA
MSLUG
October 1993April 1994March 1994September 1993
Area History1989-1990 DOT plans Minnie Street ConnectorS&W investigate surface soil, subsurface soil, and groundwater Widespread contamination stops project (petroleum, solvents, metals, PCBs)
1993-1996 MSLUG Project - Railroad and ~15 RPs USGS investigates groundwater characteristics and quality Primary focus is public drinking water wells on other site of the Chena River 2002 2004ADEC begins FAIR project (larger than MSLUG)2002 Well point investigation conducted and coordinated sampling begins2003 Risk Management Workplan completed by EPA
FAIR AREA
Four Tank Farms fuel delivered by railUNOCAL TanksSaupes TanksWillners TanksVan Gas Tanks
FAIR AREA Baseline Sampling
Groundwater Results - 2002
Groundwater Results Fall 2003
Groundwater Results Spring 2004
Groundwater Results - 2002
Groundwater Results Fall 2003
Groundwater Results Spring 2004
Groundwater Results - 2002
Groundwater Results Fall 2003
Groundwater Results Spring 2004
Groundwater Results Spring 2004