FacilityCase Study
October Revision 001 © Sport England 2016
Main entrance aproach
1
Sports hall
Reigate & Banstead Borough Council committed to the construction of two new Leisure Centres, and the comprehensive refurbishment of another as part of the Council's continued commitment to residents leisure facilities in the Borough.
The Tadworth Leisure & Community Centre was the last of the three projects, instigated because the existing facility was at the end of its serviceable life. It also provided the opportunity to form part of the regeneration of the area that includes over 300 homes.
The project was funded by Sport England and Reigate and Banstead Borough Council.
TADWORTH LEISURE & COMMUNITY
CENTRE
TADWORTH, SURREYStatus: Completed 2015Client: Reigate & Banstead Borough CouncilValue: £11.5 million
FacilityCase Study
October Revision 001 © Sport England 2016
4 44 4
2 22 222
2 22 22 2
2 2
2 2
Unisex WCY07.4
Learner Pool
25m Community Pool
Lift 1Lift 2
HallY08
Community StoreG07.1
Community RoomG07
Information WallG07.2
CrecheG07.3
Creche StoreG07.5
WCG07.4
Cafe ToiletsLobbyG06
Entrance LobbyG01
Cafe/ViewingG04
Entrance FoyerG02
ReceptionG03
Admin OfficeG03.1
Main Circulation AreaG02.1
ServeryG05
Pool HallG17
Preparation AreaG05.1
Cash OfficeG03.2
Female Drychange
G08
Female ShowerG08.1
Female WC'sG08.2
Male WC'sG09.2
Male Dry changeG09
Male ShowerG09.1
Pool StoreG17.2
TeamChange 4
G15
Wet ChangeG11
Female ShowerG11.3
Female WC'sG11.4
Male WCsG11.5
Male ShowerG11.6
Acc. SHW/WC/CG10
LV RoomG18
Changing PlacesFacilityG11.2
TeamChange 3
G14
TeamChange 2
G13
TeamChange 1
G12
Escape StairST-2
StoreY09
Hall LobbyY08.1
Music StudioY10
EntranceLobby
Y01
OfficeY11
StoreY02.2
1 to 1Room 2
Y12
1 to 1Room 1
Y13
Waiting AreaY14
Group WorkRoom 1
Y15
Group WorkRoom 2
Y17
Chill OutY02.1
PlantY04
ComputersY03
Ground FloorFiltration Plant
G21
Pool StoreG17.3 First Aid
G22
Youth AreaY02
WC LobbyY07
Clnr. St.Y07.1
Acc. ToiletY07.2
Unisex WCY07.3
CirculationY06
KitchenY05
Acc. ShowerY16
Sports HallG16
Acc.SHW/WC/CHG11.1
Poolside ViewingG17.1
CorridorG02.2
AcidStoreG19
Hypo StoreG20
Clnr.G11.7
Sports Hall StoreG16.1
EX
IT
CirculationY06
Youth AreaY02
Waiting AreaY14
1 to 1 RoomY13
Cleaners StY07.1
HallY08
General CirculationF01
Main Circulation AreaG02.1
Female WC
G08.2
Fitness SuiteF03
Female dry change
G08Pool side Veiwing
G17.1
Pool Hall
G17
Main Pool
Lift 1Lift 2Studio
F02
Studio StoreF02.1
FeatureStairST-1
Fitness SuiteF03
GeneralCirculation
F04
General CirculationF01
Male ToiletLobby
F05
Male ToiletF05.1
MaleShowers
F06.1
Female ToiletLobby
F07
Female ToiletsF07.1
FemaleDry Change
F08
FemaleShowers
F08.1
IT RoomF09
Acc.SHW/WC/CHF10
OfficeF12
Staff Rest RoomF14
Escape StairST-2
Plant RoomF15
AccessLadder
F15.1
Stair LobbyF16 Corridor
F11
RiserCupboard
F01.1
CleanersStoreF13
MaleDry Change
F06
2
An excellent example of how a good quality Public Sector Leisure Centre can be built at an Affordable Cost
Fitness suite
Entrance
Circulation / stairs
Café
Staff areas / reception
Pool hall
Spectator seating
Stores / Plant / Service void
Crèche
Youth Facility
Community Space
Sports hall
Fitness suite
Studio
Wet / Dry changing
Showers / toilets
First aid
Key
Cross sectionLevel 2 layout
Level 1 layout
FacilityCase Study
October Revision 001 © Sport England 2016
Studio
Learner pool
The project benefited from a project team that had considerable experience in Leisure Centre projects, and the design and specification were developed collaboratively with Sport England.
The stakeholders and designers focussed on all aspects of the design to keep costs within the budget envelope, for example; many rooms were left with a self-finished blockwork to minimise the cost of the finishes.
The facility features measures designed to reduce its carbon footprint and reduce running costs.
Gross Site Area
Sports Hall
Pool Hall
Fitness Suite & Studio
Dry Change
Foyer / Reception / Café
Pitches
Youth Facility / Community Space /Crèche
Wet Change / External Change
22,600 m²
34.5m x 20m 4 court hall, to club and recreational standard
25 x 13m 6-lane community pool, ranging from 0.9 to 2.0 metres deep with 13 x 7m learner pool ranging from 0.7 to 0.9 metres deep and with stepped access for full width of pool and pool side viewing area
60 station state of the art gym with views to pool hall. One studio. Dedicated changing space at 1st floor
Separate male and female changing space for sports hall
Attractive, welcoming reception with café area with views to pool hall
Four five-a-side Artificial Grass Pitches
Integrated youth facility adjoining community room and hall adjacent to crèche
Unisex changing village, with four adjacent 2 team changing rooms for outdoor pitches
3,392 m² (GEA)
4,965 m² (GIFA)
10 %
Building Footprint Area
Gross Internal Floor Area (all floors)
Circulation Area (% GIFA excluding café/reception)
Design
Accessible Design
Schedule of Areas
General Accommodation / Standards
At the outset of the project, design and budget were given a priority. Decision makers were given the opportunity to view other Centres and, with the support of capital commitments from Reigate & Banstead Borough Council, Sport England and Surrey County Council, a brief emerged that improved on the facility mix provided in the existing centre.
Key features include:
Ÿ 2 vertical access lifts
Ÿ Automatic opening sliding access doors
Ÿ Dedicated accessible toilets and changing space
Ÿ Appropriate circulation provision for wheelchair users
Ÿ Adjacent disabled parking
3
FacilityCase Study
October Revision 001 © Sport England 2016
Measures include:
Extensive use of natural lightŸHigh efficiency lighting ŸLighting controls that compensate for Ÿoccupancy and daylight
Variable speed drives on pump and fan Ÿmotors
Heat recovery on ventilation plantŸHigh efficiency boilersŸGas fired CHP acting as lead boiler, and Ÿgenerating electricity for the site
Ultraviolet as primary form of Ÿdisinfection on both pools
Natural ventilation to sports hall and Ÿreception/café
Underfloor heating to reception/caféŸAir source heat pumps providing heating Ÿand cooling to fitness suite and studios
Pool coversŸBuilding management systemŸ
Click here for ‘User Guide’Click here for current ‘Design and Cost Guidance’
Frame
Designer
Contractor
Tender
Contract
Duration
Cladding
Pool tanks
Roofing
Internal wallsand partitions
Internal doors
Wall finishes
Element
Element
Substructure
Total water area
1
Superstructure
Pool Hall area
2
Finishes
Wet Change, Toilets & Showers
3
Fittings and Furnishings
Pool Equipment Store
Fitness Suite
Sports Hall
Youth Facility
Community Space and Crèche
4
Services
Combined area of Pool Hall, Wet Change and Storage
5
External Works6
Preliminaries7
Contingencies8
Design Fees
Total Contract Sum
9
Total Cost (£)
853,000
2,483,000
809,000
321,000
2,484,000
2,237,000
1,036,000
384,000
908,000
11,515,000
Cost (£) /m²
Water Area Ratio
Approximate Area
172
416m²
500
1:1.70702m²
163
1:0.73305m²
1:0.0835m²
310m²
690m²
570m²
310m²
1:2.501,042m²
65
501
451
209
77
183
2,319
Floors
Steel frame
AFLS+P
Pellikaan Construction Ltd
OJEU Restricted
JCT
56 weeks
Composite metal cladding with aluminium windows
Sprayed concrete construction
Combination of standing seam aluminium covering and single ply membrane
Blockwork and metal stud partitions
Factory finished solid core laminate-faced door sets with fully encased encapsulated GRP doors and frames to wet areas
Painted plaster, with ceramic tiles to wet areas
Sprung wooden sports floor, vinyl & ceramic tiles to wet & changing spaces, carpet and tiles elsewhere
Notes:st
Ÿ Costs are rounded and are based on 1 quarter 2014Ÿ Costs exclude vatŸ Costs exclude fit out and equipmentŸ Costs do not include any land acquisition costs
General Description of Key Specifications and Materials
Procurement / Programme
Environmental Sustainability
Summary of Elemental Costs
Specific Items of Interest
4
Photographs provided by Reigate & Banstead Borough Council and GLL 2015
Reception
John ReedProperty Services Manager
Reigate & Banstead Borough Council
The end result is a regional sports centre of which the community can be justifiably proud.
“ “