12

FABRICATION DRAWING: DUCT WORK

  • Upload
    others

  • View
    13

  • Download
    1

Embed Size (px)

Citation preview

Page 1: FABRICATION DRAWING: DUCT WORK
User-02
BIM HOUSE GLOBAL
User-02
BIM HOUSE GLOBAL
User-02
BIM HOUSE GLOBAL
User-02
BIM HOUSE GLOBAL
User-02
BIM HOUSE GLOBAL
User-02
BIM HOUSE GLOBAL
Page 2: FABRICATION DRAWING: DUCT WORK

FABRICATION DRAWING: DUCT WORK

User-02
BIM HOUSE GLOBAL
User-02
BIM HOUSE GLOBAL
User-02
BIM HOUSE GLOBAL
User-02
BIM HOUSE GLOBAL
User-02
BIM HOUSE GLOBAL
Page 3: FABRICATION DRAWING: DUCT WORK

J

1

2

3

EXAMI./ DOC.

TOILET

PREP./POST. BED

LOBBY

1500 mm 740 mm

17

5 m

m

81

mm

Radius Bend - F4Angle 30*(100mm x 100mm)

15

00

mm

74

4 m

m1

56

mm

100 mmx100 mmTOD : 2940 mmBOD : 2840 mm

VCD-F8

FAD FAD

FAD

100 mmx100 mmTOD : 2940 mmBOD : 2840 mm

2400 mm x 150 mm Linear Grille-6A26

71

9 m

m

200 mmø-200 mmx100 mm

200 mmx200 mmTOD : 2830 mmBOD : 2630 mm

405 mm15

7 m

m

200 mmx100 mmTOD : 2780 mmBOD : 2680 mm

EAD

EAD

100 CFM Inline Fan-E6 For Toilet Exhaust Air

Linear Grille-6C4(1000 mm x 150 mm)

FCU - 6C 1.0 TR

46

0 m

m4

28

mm

600 mmx200 mmTOD : 2870 mmBOD : 2670 mm

Transition-6C2(600mm x 200mm - 700mm x 150mm)

SAD

CS AHU - 6A 2 Stage 1200 CFM

187 mm 500 mm 187 mm

27

60

mm

50

0 m

m1

868

mm

327 mm 250 mm

331 mm 250 mm

250 mm959 mm

81

4 m

m

250 mm206 mm

Canvas Connection(600mm x 250mm)

600 mmx250 mmTOD : 3275 mmBOD : 3025 mm

Transition-6A3(600mm x 250mm - 600mm x 200mm)

600 mmx200 mmTOD : 3250 mmBOD : 3050 mm

200 mmx150 mmTOD : 2800 mmBOD : 2650 mm

200 mmx150 mmTOD : 2800 mmBOD : 2650 mm

2400 mm x 150 mm Linear Grille-6A25

600 mmx150 mmTOD : 3225 mmBOD : 3075 mm

Radius Bend-6A14(600mm x 150mm)

Radius Bend-6A12Angle 90*(600mm x 150mm)

Radius Bend-6A5Angle 90*(600mm x 200mm)

Square Bend-6A9(600mm x 150mm)

Square Bend-6A19, 6A22(600mm x 150mm)

600 mmx150 mmTOD : 3225 mmBOD : 3075 mm

350 mmx200 mmTOD : 3250 mmBOD : 3050 mm

Transition-6A15(600mm x 200mm - 350mm x 200mm)

600 mmx150 mmTOD : 3225 mmBOD : 3075 mm

SAD

SAD

SAD

SAD

SADSAD

SAD

978 mm

200 mmx100 mmTOD : 2800 mmBOD : 2700 mm

200 mmø-200 mmx100 mm

100 CFM Inline Fan-EA4For Toilet Exhaust Air

200 mmx200 mmTOD : 2850 mmBOD : 2650 mm

310 mm

EAD EAD

18

00

mm

417 mm

2757 mm

31

6 m

m

34

4 m

m

Louver-E1(200mm x 200mm)

1000 mm

1226 mm

1226 mm

236 mm214 mm

32

2 m

m

451 mm 79 mm

936 mm

564 mm

80

9 m

m

1870 mm

83

0 m

m

1156 mm

Side Throw Grille-6A25(4950mm x 150mm)

2622 mm

14

14

mm

53

1 m

m

853 mm

671 mm

65

6 m

m

986 mm

318 mm

10

56

mm

406 mm

Louver-EA1(200mm x 200mm)

91

0 m

m

TOILET

Side Throw Grille-6C3(700mm x 150mm)

Exhaust Diffuser-E8Down Throw(100mm x 100mm)

Plenum Size-E3(200mm x 300mm (H)

Linear Grille-6A24(4950 mm x 150mm)

Exhaust Air DuctFor Toilet

Supply Air Duct

Fresh Air Duct

2

H001.A

EXAMI./ DOC.

6A1 6A2 6A3 6A4 6A5

6A6

6A76A8

6A106A116A12

6A13

6A14

6A15

6A16

6A176A186A19

6A206A216A22 6A236C1

6C2

6C3

E2

E4

E5

E7

E10

E11

F1

F2

F3

F5

F6

F7

F9

End Cap-F10

F11 F12F13

EA2

EA3EA5EA6

E9

EA7

EA10

Sixth Floor Lvl

26450

Terrace Lvl

30075

1

24

50

mm

200 mmx600 mmTOD : 2870 mmBOD : 2670 mm

Transition-6C2(600mm x 200mm - 700mm x 150mm)

Side Throw Grille-6C3For Supply Air (400 CFM)Size : 700mm x 150mm)

Threaded Rod

EXAMI./ DOC.

85

0 m

m

Linear Grille-6C41000 mm x 150 mm

45

5 m

m9

5 m

m

24

5 m

m

1062 mm

FCU - 6C 1.0 TR

SAD

6C1

6C2

SI.No. Size Description Material Length (RM) Quantity (Nos)

600mm x 250mm Rectangular Duct - 6A2 26G Galvanized Sheet Steel Ducting 0.187 11)

600mm x 200mm Rectangular Duct - 6A4 26G Galvanized Sheet Steel Ducting 0.187 12)

600mm x 200mm Rectangular Duct - 6A6 26G Galvanized Sheet Steel Ducting 2.760 13)

600mm x 150mm Rectangular Duct - 6A8 26G Galvanized Sheet Steel Ducting 0.206 14)

600mm x 150mm Rectangular Duct - 6A11 26G Galvanized Sheet Steel Ducting 0.959 15)

600mm x 150mm Rectangular Duct - 6A13 26G Galvanized Sheet Steel Ducting 0.8146)

600mm x 150mm Rectangular Duct - 6A18 26G Galvanized Sheet Steel Ducting 0.3317)

600mm x 150mm Rectangular Duct - 6A21 26G Galvanized Sheet Steel Ducting 0.3278)

600mm x 150mm Rectangular Duct (For Grille Connection) 26G Galvanized Sheet Steel Ducting 0.8239)

350mm x 250mm Rectangular Duct - 6A16 26G Galvanized Sheet Steel Ducting 1.868 110)

1

1

1

1

8.462 10TOTAL CARRIED TO SUMMARY

Service : 6A (Ducting for Pre. Post Bed :- 1200 CFM)SI.No. Size Description Material Length (RM) Quantity (Nos)

600mm x 200mm Rectangular Duct - 6C1 26G Galvanized Sheet Steel Ducting 0.460 11)

0.460 1TOTAL CARRIED TO SUMMARY

Service : 6C (Ducting for Exami. / Doc. :- 1.0 TR)

SI.No. Size Description Material Length (RM) Quantity (Nos)

200mm x 300mm Plenum Box - E3 26G Galvanized Sheet Steel Ducting 0.405 11)

1.367 4TOTAL CARRIED TO SUMMARY

Service : E (Ducting for Toilet :- 100 CFM)

200mm x 200mm Rectangular Duct - E2 26G Galvanized Sheet Steel Ducting 0.160 12)

200mm x 300mm Rectangular Duct - E4 26G Galvanized Sheet Steel Ducting 0.083 13)

200mm x 300mm Rectangular Duct - E10 26G Galvanized Sheet Steel Ducting 0.719 14)

ABBREVIATION:

SAD :-Supply Air DuctEAD :-Exhaust Air DuctFAD :-Fresh Air DuctFCU :-Fan Coil UnitAHU :- Air Handling UnitTOD :-Top of DuctBOD :- Bottom of DuctVCD :- Volume Control Damper

Date

Drawn by

Checked by

Approved by

Project No.

Drawing No.

Dimensions are not to be scaled.

NO

TE

S

Structural Consultant

Project Title

Drawing Title

Client

Architects

MEP Consultant

DescriptionDateNo. By

All dimensions (if present) are in mm.

Revisions

DescriptionDateNo. By

Issues

BIM Consultant

BIM HOUSE GLOBAL Pvt. Ltd.Projects | Consulting | Training

The purpose of this drawing is to only highlight coordination issues between Architectural, Structural & MEPF (Mechanical, Electrical, Plumbing & Fire-fighting) discipline, for the project design consultants to update their respective discipline drawings

This drawing should not be referred for any other purpose

A1 Size Sheet = 841 x 594

BC-108, Matrix Tower, Opp. Jaypee Hospital,Sector-132, Noida-201304

dd/mm/yyyy

Author

H001.A

Fabrication_HVAC Part-01

Checker

Approver

1 : 25

6th Floor_HVAC - Part 011

1 : 15

Section 22

1 : 50

Quantity_Ducting Route 6A

1 : 50

Quantity_Ducting Route 6C

1 : 50

Quantity_Ducting Route E

BIM House
BIM HOUSE GLOBAL
User-02
BIM HOUSE GLOBAL
User-02
BIM HOUSE GLOBAL
User-02
BIM HOUSE GLOBAL
User-02
BIM HOUSE GLOBAL
User-02
BIM HOUSE GLOBAL
Page 4: FABRICATION DRAWING: DUCT WORK

SI.No. Size Description Material Length (RM) Quantity (Nos)

200mm x 200mm Rectangular Duct - EA2 26G Galvanized Sheet Steel Ducting 0.310 11)

1.288 2TOTAL CARRIED TO SUMMARY

Service : EA (Ducting for Toilet :- 100 CFM)

200mm x 100mm Rectangular Duct - EA6 26G Galvanized Sheet Steel Ducting 0.978 12)

SI.No. Size Description Material Length (RM) Quantity (Nos)

200mm x 150mm Rectangular Duct- F1 & F11 26G Galvanized Sheet Steel Ducting 1.500 21)

4.897 8TOTAL CARRIED TO SUMMARY

Service : F (Ducting for Fresh Air Duct)

200mm x 150mm Rectangular Duct - F12 26G Galvanized Sheet Steel Ducting 0.740 12)

100mm x 100mm Rectangular Duct - F3 26G Galvanized Sheet Steel Ducting 0.081 13)

100mm x 100mm Rectangular Duct - F5 26G Galvanized Sheet Steel Ducting 0.176 14)

100mm x 100mm Rectangular Duct - F6 26G Galvanized Sheet Steel Ducting 1.500 15)

100mm x 100mm Rectangular Duct - F7 26G Galvanized Sheet Steel Ducting 0.744 16)

100mm x 100mm Rectangular Duct - F9 26G Galvanized Sheet Steel Ducting 0.156 17)

SI.No. Size Description Material Length (RM) Quantity (Nos)

4950mm x 150mm Linear Grille - 6A24 Aluminum (With Powder coated & 18G Blade Thickness

4.950 11)

4950mm x 150mm Side Throw Grille - 6A25 4.950 12)

9.900 3TOTAL CARRIED TO SUMMARY

Service : 6A (Equipment for Pre. Post Bed :- 1200 CFM)

Aluminum (With Powder coated & 18G Blade Thickness

1800mm x 850mm 800mm(H)

CS AHU - 6A2 Stage (1200 CFM)

13) As per BOQ NA

SI.No. Size Description Material Length (RM) Quantity (Nos)

700mm x 150mm Side Throw Grille - 6C3 Aluminum (With Powder coated & 18G Blade Thickness

0.700 11)

1000mm x 150mm Linear Grille - 6C4 1.000 12)

1.700 3TOTAL CARRIED TO SUMMARY

Service : 6C (Equipment for Exami. / Doc. :- 1.0 TR)

Aluminum (With Powder coated & 18G Blade Thickness

1000mm x 550mm 300mm (H)

FCU - 6C 1.0 TR

NA 13) As per BOQ

SI.No. Size Description Material Length (RM) Quantity (Nos)

200mm x 300mm Linear Grille - E1 Aluminum (With Powder coated & 18G Blade Thickness

0.200 11)

100mm x 100mm Exhaust Diffuser - E8 0.000 12)

0.200 2TOTAL CARRIED TO SUMMARY

Service : E (Equipment for Toilet :- 100 CFM)

Aluminum (With Powder coated)

100 Dia Inline Fan - E6 NA 13) As per BOQ

SI.No. Size Description Material Length (RM) Quantity (Nos)

200mm x 200mm Linear Grille - EA1 Aluminum (With Powder coated & 18G Blade Thickness

0.200 11)

100mm x 100mm Exhaust Diffuser - EA7 0.000 12)

0.200 3TOTAL CARRIED TO SUMMARY

Service : EA (Equipment for Toilet :- 100 CFM)

Aluminum (With Powder coated)

100mm Dia Inline Fan NA 13) As per BOQ

SI.No. Size Description Material Length (RM) Quantity (Nos)

100mm x 100mm Volume Control Damper - F8 Aluminum 0.078 11)

0.078 1TOTAL CARRIED TO SUMMARY

Service : F (Equipment for Fresh Air Duct)

SI.No. Size Description Material Length (RM) Quantity (Nos)

600mm x 250mm Canvas Connection - 6A1 26G Galvanized Sheet Steel Ducting 0.100 11)

350mm x 200mm End Cap - 6A23 26G Galvanized Sheet Steel Ducting 0.000 12)

600mm x 150mm Radius Bend 90* Deg - 6A14, 6A12 26G Galvanized Sheet Steel Ducting 0.000 23)

600mm x 200mm Radius Bend 90* Deg - 6A5

26G Galvanized Sheet Steel Ducting 0.000 3

4)

600mm x 150mm Square Bend 90* Deg - 6A9, 6A19, 6A22

26G Galvanized Sheet Steel Ducting 0.250

5)

6)

7)

800mm x 150mm - 600mm x 150mm Shoe - 6A7, 6A10, 6A17, 6A20

26G Galvanized Sheet Steel Ducting

8)

Transition - 6A15 26G Galvanized Sheet Steel Ducting 0.500 1

4

2.100 14

Service : 6A (Fitting for Pre. Post Bed - 1200 CFM)

600mm x 200mm - 350mm x 200mm

600mm x 250mm - 600mm x 200mm 26G Galvanized Sheet Steel Ducting

TOTAL CARRIED TO SUMMARY

0.500Transition - 6A3 1

0.000 1

SI.No. Size Description Material Length (RM) Quantity (Nos)

600mm x 200mm - 700mm x 150mm Transition - 6C2 26G Galvanized Sheet Steel Ducting 0.428 11)

0.428 1TOTAL CARRIED TO SUMMARY

Service : 6C (Fitting for Exami. / Doc. - 1.0 TR)

SI.No. Size Description Material Length (RM) Quantity (Nos)

200mm x 100mm End Cap - E11 26G Galvanized Sheet Steel Ducting 0.000 11)

0.575 5TOTAL CARRIED TO SUMMARY

Service : E (Fitting for Toilet :- 100 CFM)

200mm x 300mm

200mm x 100mm - 100mm x 100mm

200mm Dia - 200mm x 100mm

End Cap - E3

Shoe - E9

Square to Round - E5, E7

26G Galvanized Sheet Steel Ducting

26G Galvanized Sheet Steel Ducting

26G Galvanized Sheet Steel Ducting

0.000 1

0.175 1

0.200 2

2)

3)

4)

SI.No. Size Description Material Length (RM) Quantity (Nos)

200mm x 100mm End Cap - EA10 26G Galvanized Sheet Steel Ducting 0.000 11)

0.575 4TOTAL CARRIED TO SUMMARY

Service : EA (Fitting for Toilet :- 100 CFM)

200mm x 100mm - 100mm x 100mm

200mm Dia - 200mm x 100mm

Shoe - EA7

Square to Round - EA3, EA5

26G Galvanized Sheet Steel Ducting

26G Galvanized Sheet Steel Ducting

0.175 1

0.200 2

2)

3)

SI.No. Size Description Material Length (RM) Quantity (Nos)

100mm x 100mm End Cap - F10 26G Galvanized Sheet Steel Ducting 0.000 11)

0.175 5TOTAL CARRIED TO SUMMARY

Service : F (Fitting for Fresh Air Duct)

200mm x 150mm

100mm x 100mm

End Cap - F13

Radius Bend - F4

26G Galvanized Sheet Steel Ducting

26G Galvanized Sheet Steel Ducting

0.000 1

0.000 2

2)

3)

200mm x 100mm - 100mm x 100mm Shoe - F2 26G Galvanized Sheet Steel Ducting 0.175 14)

ABBREVIATION:

SAD :-Supply Air DuctEAD :-Exhaust Air DuctFAD :-Fresh Air DuctFCU :-Fan Coil UnitAHU :- Air Handling UnitTOD :-Top of DuctBOD :- Bottom of DuctVCD :- Volume Control Damper

Dimension Value (mm)

A Width 200B Depth 100C Diameter 200D Length 200E Extension 50F Collar 50G Corner Radius 0.0H Slope Angle 18.439

Fitting No. E5, E7, EA3 & EA5

Dimension Value (mm)

A Width In 700B Depth In 150C Width Out 600D Depth Out 200E Length 427.95F Extension In 50G Extension Out 50H Offset Width -50

Fitting No. 6C2

I

J

Offset Depth -180

Angle 28.76043

Dimension Value (mm)

A Top Width 150B Depth 600C Bottom Width 150D Top Extension 100E Bottom Extension 100

Fitting No. 6A9, 6A19 & 6A22

Date

Drawn by

Checked by

Approved by

Project No.

Drawing No.

Dimensions are not to be scaled.

NO

TE

S

Structural Consultant

Project Title

Drawing Title

Client

Architects

MEP Consultant

DescriptionDateNo. By

All dimensions (if present) are in mm.

Revisions

DescriptionDateNo. By

Issues

BIM Consultant

BIM HOUSE GLOBAL Pvt. Ltd.Projects | Consulting | Training

The purpose of this drawing is to only highlight coordination issues between Architectural, Structural & MEPF (Mechanical, Electrical, Plumbing & Fire-fighting) discipline, for the project design consultants to update their respective discipline drawings

This drawing should not be referred for any other purpose

A1 Size Sheet = 841 x 594

BC-108, Matrix Tower, Opp. Jaypee Hospital,Sector-132, Noida-201304

dd/mm/yyyy

Author

H001.B

Fabrication_HVAC Part-01

Checker

Approver

1 : 50

Quantity_Ducting Route EA

1 : 50

Quantity_Ducting Route F

1 : 50

Quantity_Equipment for Route 6A

1 : 50

Quantity_Equipment for Route 6C

1 : 50

Quantity_Equipment for Route E

1 : 50

Quantity_Equipment for Route EA

1 : 50

Quantity_Equipment for Route F

1 : 50

Quantity_Fitting for Route 6A

1 : 50

Quantity_Fitting for Route 6C

1 : 50

Quantity_Fitting for Route E

1 : 50

Quantity_Fitting for Route EA

1 : 50

Quantity_Fitting for Route F

1 : 50

Details_Square to Round Fitting

1 : 50

Details_Transition

1 : 50

Details_Square Bend 90*

BIM House
BIM HOUSE GLOBAL
User-02
BIM HOUSE GLOBAL
User-02
BIM HOUSE GLOBAL
User-02
BIM HOUSE GLOBAL
User-02
BIM HOUSE GLOBAL
Page 5: FABRICATION DRAWING: DUCT WORK

FABRICATION LEVEL MODEL TO CUTTING ANDASSEMBLY AT FACTORY

User-02
BIM HOUSE GLOBAL
User-02
BIM HOUSE GLOBAL
User-02
BIM HOUSE GLOBAL
User-02
BIM HOUSE GLOBAL
User-02
BIM HOUSE GLOBAL
User-02
BIM HOUSE GLOBAL
User-02
BIM HOUSE GLOBAL
User-02
BIM HOUSE GLOBAL
User-02
BIM HOUSE GLOBAL
User-02
BIM HOUSE GLOBAL
Page 6: FABRICATION DRAWING: DUCT WORK
BIM House
BIM HOUSE GLOBAL
User-02
BIM HOUSE GLOBAL
User-02
BIM HOUSE GLOBAL
User-02
BIM HOUSE GLOBAL
User-02
BIM HOUSE GLOBAL
User-02
BIM HOUSE GLOBAL
User-02
BIM HOUSE GLOBAL
User-02
BIM HOUSE GLOBAL
User-02
BIM HOUSE GLOBAL
User-02
BIM HOUSE GLOBAL
User-02
BIM HOUSE GLOBAL
Page 7: FABRICATION DRAWING: DUCT WORK
BIM House
BIM HOUSE GLOBAL
User-02
BIM HOUSE GLOBAL
User-02
BIM HOUSE GLOBAL
User-02
BIM HOUSE GLOBAL
User-02
BIM HOUSE GLOBAL
User-02
BIM HOUSE GLOBAL
User-02
BIM HOUSE GLOBAL
User-02
BIM HOUSE GLOBAL
User-02
BIM HOUSE GLOBAL
Page 8: FABRICATION DRAWING: DUCT WORK
BIM House
BIM HOUSE GLOBAL
User-02
BIM HOUSE GLOBAL
User-02
BIM HOUSE GLOBAL
User-02
BIM HOUSE GLOBAL
User-02
BIM HOUSE GLOBAL
User-02
BIM HOUSE GLOBAL
User-02
BIM HOUSE GLOBAL
User-02
BIM HOUSE GLOBAL
User-02
BIM HOUSE GLOBAL
User-02
BIM HOUSE GLOBAL
Page 9: FABRICATION DRAWING: DUCT WORK
BIM House
BIM HOUSE GLOBAL
User-02
BIM HOUSE GLOBAL
User-02
BIM HOUSE GLOBAL
User-02
BIM HOUSE GLOBAL
User-02
BIM HOUSE GLOBAL
User-02
BIM HOUSE GLOBAL
User-02
BIM HOUSE GLOBAL
User-02
BIM HOUSE GLOBAL
User-02
BIM HOUSE GLOBAL
User-02
BIM HOUSE GLOBAL
Page 10: FABRICATION DRAWING: DUCT WORK

SPOOL DRAWING FOR FABRICATION &INSTALLATION

User-02
BIM HOUSE GLOBAL
User-02
BIM HOUSE GLOBAL
User-02
BIM HOUSE GLOBAL
User-02
BIM HOUSE GLOBAL
User-02
BIM HOUSE GLOBAL
User-02
BIM HOUSE GLOBAL
User-02
BIM HOUSE GLOBAL
User-02
BIM HOUSE GLOBAL
User-02
BIM HOUSE GLOBAL
Page 11: FABRICATION DRAWING: DUCT WORK

002H

002B

002A

002C

002D

002E

002F

002G

002I

002J

002K

CWR 002

CHR 001

CWR 002

CWR 003

CWR 004

CWS 005

Mark Qty Description Length (meter)Size

MS Pipe Class C as per IS : 1239002B 1 150mm Dia 1.100

MS Pipe Class C as per IS : 1239002H 1 150mm Dia 0.916

MS Pipe Class C as per IS : 1239CWR 002 1 150mm Dia 0.719

2.735 meterTotal

Spool CWR 002 Bill of Material_Pipe

Mark Qty Description Length (m)Size

Threadolet002A 1 250mm-150mm Dia 0.166

Gate Valve002E 1 150mm Dia 0.267

PN 25 Type 11 WN Flange002F 1 150mm Dia 0.035

MS 90 deg Elbow002J 1 150mm Dia

PN 25 Type 11 WN Flange002D 1 150mm Dia 0.035

NA

Spool CWR 002 Bill of Material_Fitting

Mark Qty Description Length (m)Size

PN 25 Bolt002F 4 150mm Dia 0.000

002D 4 150mm Dia 0.000

002F 1 150mm Dia 0.000

002D 1 150mm Dia 0.000

PN 25 Bolt

PN 25 Gasket

PN 25 Gasket

Spool CWR 002 Bill of Material_Bought

Mark Qty Description Length (m)Size

MS Field Weld Gap 3mm002I 1 150mm Dia 0.003

002K 1 150mm Dia 0.003

002G 1 150mm Dia 0.003

002C 1 150mm Dia 0.003

MS Field Weld Gap 3mm

MS Field Weld Gap 3mm

MS Field Weld Gap 3mm

Spool CWR 002 Bill of Material_Weld

6401 mm

6289 mm

4910 mm

90

.00°

90.00°

LEGEND

CWR:- Chilled Water Return

MS:- Mild Steel

Date

Drawn by

Checked by

Approved by

Project No.

Drawing No.

Dimensions are not to be scaled.

NO

TE

S

Structural Consultant

Project Title

Drawing Title

Client

Architects

MEP Consultant

DescriptionDateNo. By

All dimensions (if present) are in mm.

Revisions

N

Issues

BIM Consultant

BIM HOUSE GLOBAL PVT. LTD.BUILDING INFORMATION MODELLING SERVICES

The purpose of this drawing is to only highlight coordination issues between Architectural, Structural & MEPF (Mechanical, Electrical, Plumbing & Fire-fighting) discipline, for the project design consultants to update their respective discipline drawings

This drawing should not be referred for any other purpose

A2 Size Sheet = 594 x 420

DescriptionDateNo. By

Design | Construction | Facility Management

Noida, INDIA (Head Office) | Houston, USA | www.bimhouseglobal.com

dd/mm/yyyy

Author

A101

Spool Drawing

Checker

Approver

Spool_CWR 0021

Spool Continued on:- CWR 001

3D View2

1 : 25

Spool CWR 002_Elevation Front3

1100 m

m

MS

Pip

e C

lass C

916 m

m

MS

Pip

e C

lass C

719 mm

MS Pipe Class C

Flange

Bolt

Gasket

Threadolet

Weld

All Dimensions are to the end of pipe, face of flange, or centerline of fitting, unless otherwise noted.

Note:-

Spool_CWR 0014

User-02
BIM HOUSE GLOBAL
User-02
BIM HOUSE GLOBAL
User-02
BIM HOUSE GLOBAL
User-02
BIM HOUSE GLOBAL
User-02
BIM HOUSE GLOBAL
User-02
BIM HOUSE GLOBAL
User-02
BIM HOUSE GLOBAL
User-02
BIM HOUSE GLOBAL
User-02
BIM HOUSE GLOBAL
Page 12: FABRICATION DRAWING: DUCT WORK
BIM House
Text Box
THANK YOU
User-02
BIM HOUSE GLOBAL
User-02
BIM HOUSE GLOBAL