Expediting Status - Indra - 1 Sep 15 Rev

Embed Size (px)

DESCRIPTION

Expediting status sample

Citation preview

  • Current Position PIC Due Date Rem. Dur

    Prepare Kbricatdy for Done -g ArraOtw Sbm CleaVessel w LuwAt SiteInstrument Bulk Material I - Additional Items Otw Luwuk Shipping 5-Sep-15 3 ### ### ### ### ### ### ### ### ###

    Ultrasonic Flow Transmitter Otw Luwuk Shipping 5-Sep-15 3 ### ### ### ### ### ### ### ### ###

    Rotameter Otw Luwuk Shipping 5-Sep-15 3 ### ### ### ### ### ### ### ### ###

    Temperature Indicator & Thermowhell Otw Luwuk Shipping 11-Sep-15 9 ### ### ### ### ### ### ### ### ###Control Valve Custom Clearance Shipping 3-Sep-15 1 ### ### ### ### ### ### ###Pressure Safety Valve - Sea Freight Waiting Vessel to Luwuk Shipping 5-Sep-15 3 ### ### ### ### ### ### ### ###Differential Pressure Indicator and Pressure Indicator - Otw Sby Shipping 2-Sep-15 0 ### ### ### ### ### ###Orifice Plate & Flange - Sea Freight Shipping Arrangement Shipping 2-Sep-15 0 ### ### ### ### ###

    Radar Level Transmitter Shipping Arrangement Shipping 3-Sep-15 1 ### ### ### ### ###

    Sampling connection Shipping Arrangement Shipping 3-Sep-15 1 ### ### ### ### ###

    SDV/BDV & On/Off Valves Shipping Arrangement Shipping 6-Sep-15 4 ### ### ### ### ###

    Gas Chromatograph System Shipping Arrangement Shipping 6-Sep-15 4 ### ### ### ### ###

    Magnetic Flow Transmitter FAT Done - RSR Expediter 9-Sep-15 7 ### ### ### ###

    Differential Pressure and Pressure Transmitter Ready for FAT Expediter 10-Sep-15 8 ### ### ###

    Pressure Switch Ready for FAT Expediter 11-Sep-15 9 ### ### ###

    Level Indicator Fabrication Expediter 13-Sep-15 11 ### ###Level Indicator - Change 1 item Fabrication Expediter 13-Sep-15 11 ### ###pH, Redox, and Conductivity Transmitter FAT Done - RSR Expediter 14-Sep-15 12 ### ### ### ###

    Temperature Transmitter and Thermowell Ready for FAT Expediter 15-Sep-15 13 ### ### ###

    Gas Analyzer (CO2, H2S, Moisture) Ready for FAT Expediter 16-Sep-15 14 ### ### ###

    Differential Pressure and Pressure Transmitter (Integral orifice 6 pcs) Ready for FAT Expediter 16-Sep-15 14 ### ### ###

    CEMS Fabrication Expediter 17-Sep-15 15 ### ###

    Requisition

    To L

    uwuk

    Site

    FAT

    Status

    PO KoM

    Fabr

    RSR

    Del

    iver

    y

    At S

    by

    Cus

    tom

    s