PRE FEASIBILITY REPORT Existing Multicolour Granite Quarry
AT
S.F.No. 224/1, 224/2, 224/3, 224/4 and 224/20A,
Extent: 1.97.0 Hectares
Ariyur Village,
Illupur Taluk, Pudukkottai District.
PROPONENT
Tvl. Yellow Stone Enterprises,
Pudukkottai District, TAMILNADU.
CONSULTANT
Aadhi Boomi Mining and Enviro Tech (P) Ltd,
Salem District, TAMILNADU.
PFR – Tvl. Yellow Stone Enterprises, Pudukkottai 12
Consultant: AADHI BOOMI MINING AND ENVIRO TECH (P) LTD, SALEM, TN
Chapter No. Chapter Title Page No.
1 Executive Summary ...13
2 Introduction of the Project ...14
3 Project description ...15
4 Site Analysis ...18
5 Planning Brief ...19
6 Proposed Infrastructure ...20
7 R & R Plan ...21
8 Project Schedule & Cost …21
9 Analysis of Proposal …22
PFR – Tvl. Yellow Stone Enterprises, Pudukkottai 13
Consultant: AADHI BOOMI MINING AND ENVIRO TECH (P) LTD, SALEM, TN
1. EXECUTIVE SUMMARY
The Proponent, Tvl. Yellow Stone Enterprises, is intended to apply for
Environment Clearance, over an extent of 1.97.0Hectares in S.F.No.224/1, 224/2,
224/3, 224/4 and 224/20A, Ariylur Village of Illupur Taluk, Pudukkottai District.
The Proponent has vast experience in mining and marketing of granite rough
dimensional blocks and finished products in the domestic and overseas market.
The mining lease was granted vide G.O.3(D)No.2 Industries (MMB-2)
Dept, dated 04.01.2001 for a period of 20years (04.10.2001 to 03.10.2021). The
mining plan was prepared and submitted during the year 2000 and was
approved by the State Geology and Mining Department, Guindy, Chennai vide
letter no. 4439/MM2/2001 dated 20.09.2001. The mining Scheme is prepared for
period from 2016 - 2021 for effective implementation.
The scheme of quarrying is prepared with a view of optimum exploitation
of deposit by systematic quarrying and scientific mining with proper bench
formation and adhering to strict safety measures. The main objective of this
scheme is to maintain consistent ore to waste ratio, uniform cost of mining, profit
margin, mineral conservation and proper dumping of waste/rejects with a bare
minimum damage to the environment and society.
The EIA (Environmental Impact Assessment) Notification, 2006,
requires mining projects, including new projects, expansion, modernization, or
renewal of mine leases of minor minerals less than 5 Ha has to obtain
Environmental clearance from the DEIAA.
Accordingly, the proponent has submitted Form1M, Prefeasibility report,
Copy of Scheme of Mining for issuing Environmental Clearance for the above
quarrying activity from DEIAA/DEAC, Pudukottai.
PFR – Tvl. Yellow Stone Enterprises, Pudukkottai 14
Consultant: AADHI BOOMI MINING AND ENVIRO TECH (P) LTD, SALEM, TN
2. INTRODUCTION OF THE PROJECT/BACKGROUND INFORMATION
(i) Identification of the project
and project proponent. (In
case of mining project, a
copy of mining lease/ letter
of intent should be given)
Identification of Project:
Tvl. Yellow Stone Enterprises
S.F.No. 224/1, 224/2, 224/3, 224/4 and 224/20A,
Extent: 1.97.0 Hectares
Ariylur Village,
Illupur Taluk, Pudukkottai District.
Identification of Project Proponent:
Tvl. Yellow Stone Enterprises
No.33, 2nd
Street,
Sivanandapuram, Pudukkottai District,
Tamil Nadu. Pin Code: 622 001.
Phone: +04322 24879.
The mining lease was granted vide G.O.3(D) No.2
Industries (MMB-2) Dept, dated 04.01.2001 for a
period of 20years (04.10.2001 to 03.10.2021).
(ii) Brief description of nature of
the project
Open cast method of semi mechanized quarrying
method is adopted to raise the production in this
area using Line drilling, smooth blasting and block
lifting using cranes. Waste and rejects removal
using Hydraulic excavators and tippers
combination. The Wire saw cutting is adopted
below second bench to recover more granite blocks
to increase the rate of recovery. Removing the
defective portion and dressing into the dimensional
blocks are done manually using feather, wedges
and chisels by the skilled Chislemen. The defect
free dimensional stone of different sizes are
marketed into domestic and international market.
The waste material generated during quarrying
activity includes rock fragments of different sizes
and waste chips during dressing of blocks are
dumped in the area earmarked as waste dump.
(iii) Need for the project and its
importance to the country
and/or region
The Granite dimension stone is used in buildings,
bridges, paving, monuments, and many other
exterior projects. Indoors, polished granite slabs
and tiles are used in countertops, tile floors, stair
treads and many other design elements.
The Granite raised out of the mine is proposed to be
transported to the different parts of the country.
The mining activities have uplifted the economy of
people in the adjoining area, besides contributing to
the exchequer of the State and Central Government.
PFR – Tvl. Yellow Stone Enterprises, Pudukkottai 15
Consultant: AADHI BOOMI MINING AND ENVIRO TECH (P) LTD, SALEM, TN
(iv) Demand-supply gap Depending upon the market demand granite blocks
are economically viable at present market
conditions.
(v)
Imports vs. Indigenous
production
Not Applicable
(vi) Export Possibility Not Applicable
(vii) Domestic/ export markets The material is used in the domestic market and
exported to other parts of country.
(viii) Employment Generation
(Direct and Indirect) due to
the project
About 26 people will get direct employment and
equal number or more will get indirect
employment.
3. PROJECT DESCRIPTION
(i) Type of project including
interlinked and interdependent
projects, if any
The applicant does not have the facilities to
cut and polish the rough blocks of granite. He
proposes to export the rough blocks directly
to the potential buyers of the Domestic and
world market.
(ii) Location (map showing general
location, specific location, and
project boundary & project site
layout) with coordinates:
The location is represented by Toposheet No.
58 J/15.
Latitude: 10°24'58.94"N to 10°25'04.83"N
Longitude: 78°44'33.99"E to 78°44'44.19"E
Fig. 3.1: Google Image showing Mining Lease Boundary
PFR – Tvl. Yellow Stone Enterprises, Pudukkottai 16
Consultant: AADHI BOOMI MINING AND ENVIRO TECH (P) LTD, SALEM, TN
Fig.3.2 Google Image showing surface features around 300m & 500m radius
(iii) Details of alternate sites,
considered and the basis
of selecting the proposed
site, particularly the
environmental
considerations gone into
should, be highlighted:
No alternate site was considered as the project is
mineral specific and site specific.
(iv) Size or magnitude of
operation:
Extent: 1.97.0 Ha
Period of Lease: 20years (04.10.2001 to
03.10.2021).
Geological Reserves: 92,958 m3
Mineable Reserves: 24,053 m3
Production 100 m3 / annum (2016-2021)
PFR – Tvl. Yellow Stone Enterprises, Pudukkottai 17
Consultant: AADHI BOOMI MINING AND ENVIRO TECH (P) LTD, SALEM, TN
(v) Project description with
process details (a
schematic diagram/ flow
chart showing the
project layout,
components of the
project etc. should be
given):
Open cast method of semi mechanized quarrying
method is adopted to raise the production in this area
using Line drilling, smooth blasting and block lifting
using cranes. Waste and rejects removal using
Hydraulic excavators and tippers combination. The
Wire saw cutting is adopted below second bench to
recover more granite blocks to increase the rate of
recovery. Removing the defective portion and
dressing into the dimensional blocks are done
manually using feather, wedges and chisels by the
skilled Chislemen. The defect free dimensional
stone of different sizes are marketed into domestic
and international market. The waste material
generated during quarrying activity includes rock
fragments of different sizes and waste chips during
dressing of blocks are dumped in the area earmarked
as waste dump.
(vi) Raw material required
along with estimated
quantity, likely source,
marketing area of final
product(s), mode of
transport of raw
material and finished
product:
No raw material is required for this project. The
Granite raised out of the mine is proposed to be
transported to the polishing units as well as
exports through agencies.
(vii) Resource optimization
/recycling and reuse
envisaged in the project,
if any, should be briefly
outlined:
No recycling and reuse of material is envisaged as
entire excavated material will be transported.
(viii) Availability of water its
source, energy /power
requirement and source
should be given:
Total water requirement in the mine will be
about 6.0 KLD for drinking & domestic use, dust
suppression and plantation. Drinking water will
be utilized from the Mineral water industries.
Water for dust suppression and green belt will be
met from nearby existing sources such as surface
water bodies and bore wells.
(ix) Quantity of wastes to be
generated (liquid and
solid) and scheme for
their management
/disposal :
There will be a generation of topsoil about 510m3
during the scheme period which will be dumped
along the western boundary barrier for
afforestation. Granite rejects forms nearly 80% of
ROM and the total quantity of waste in the
scheme period will be around 2000m3.
PFR – Tvl. Yellow Stone Enterprises, Pudukkottai 18
Consultant: AADHI BOOMI MINING AND ENVIRO TECH (P) LTD, SALEM, TN
(x) Schematic
representations of the
feasibility drawing
which give information
of EIA purpose:
In accordance with the statutory obligation the
project needs environment clearance from State
Environmental Impact Assessment Authority
(SEIAA). The project falls under B2 Category and
hence site specific EMP has been given.
4. SITE ANALYSIS
(i) Land Form, Land use and
Land ownership
The area is classified as Non forest Patta land.
S. No Description Present
Area (Ha)
Area at the
end of 5th
year (Ha)
1 Mining Area 0.24.0 0.29.5
2 Infrastructure --- 0.01.0
3 Roads 0.02.0 0.02.0
4 Green Belt --- 0.10.0
5 Waste Dump --- 0.08.0
6 Unutilized area 1.71.0 1.46.5
Total 1.97.0 Ha 1.97.0 Ha
(ii) Topography (along with
map):
Toposheet No. 58 J 15.
Latitude: 10°24'58.94"N to 10°25'04.83"N
Longitude: 78°44'33.99"E to 78°44'44.19"E
The area is almost a flat terrain and granite
rock is well exposed at many places with
intermittent soil cover. There are pits nearby
on the southern side of the area applied for
lease varying in depth from 1-2m. The general
gradient of the land is from South to North.
(iii) Existing land use pattern (agriculture, non-agriculture, forest, water bodies (including area under CRZ)), shortest distances from the periphery of the project to periphery of the forests, national park, wild life sanctuary, eco sensitive areas, water bodies(distance from, the HFL of the river), CRZ, In case of notified industrial area, a copy of the Gazette notification should be given:
Sensitive area Name Distance from Quarry
Reserve Forest --- Nil within 10 km
National Park --- Nil within 10 km
Wildlife
Sanctuary
--- Nil within 10 km
Eco sensitive
areas
--- Nil within 10 km
Water bodies --- Nil within 500 m radius
CRZ --- Nil within 10 km
PFR – Tvl. Yellow Stone Enterprises, Pudukkottai 19
Consultant: AADHI BOOMI MINING AND ENVIRO TECH (P) LTD, SALEM, TN
(iv) Existing infrastructure
within the site
The lease area is well connected with road network
and approachable in all seasonal conditions.
(v) Soil classification The overburden soil is reddish and gravelly in
nature. It occurs to a depth of 1.0m.
(vi) Climatic data from
secondary sources:
The climate is semi-arid with maximum
temperature upto 35°C in summer and 25°C
during winter seasons. The area receives 600 –
800 m rainfall per annum during both south west
and north east monsoons.
(vii) Social infrastructure
available
Description Place Distance
Railway Station Pudukottai 8 km SE
Airport Tirchy 40 km N
Police station Ariyur 1 km NW
Nearest Village Marayappatti 450m SE
Nearest Town Pudukottai 9 km E
5. PLANNING BRIEF
(i) Planning concept (type of
industries, facilities,
transportation etc) Town
and country planning/
Development authority
classification
On view monitoring of mining activity few technical
staff, skilled and non-skilled labours and will get
employment and State/Central Govt. and Village
Panchayat will get royalty.
(ii) Population projection S.No. Name of the
village
~ Distance
and
direction
~
Population
1 Ariyur 1.5 km NW 800
2 Perunjinai 1.5 km NE 250
3 Marayappatti 1.0 km SE 600
4 Mangudi 2.5 km SW 1200
(iii) Land use planning (break-
up along with green belt
etc.)
The 7.5 m and 10 m safety distance along the lease
boundary were identified to be utilized for
subsequent Afforestation. Afforestationplan is as
given below:
Year Species No Survival
rate (%)
No. of trees
expected
to grow
2016-17
Pongami
apinnata
20 80 16
2017-18 20 80 16
2018-19 20 80 16
2019-20 20 80 16
2020-21 20 80 16
PFR – Tvl. Yellow Stone Enterprises, Pudukkottai 20
Consultant: AADHI BOOMI MINING AND ENVIRO TECH (P) LTD, SALEM, TN
(iv) Assessment of
infrastructure demand
(Physical & Social)
The existing road network will be sufficient to meet
the proposed production capacity. Existing approach
road on the southern side will be utilized for
transportation.
(v) Amenities/ Facilities Around 26 persons including supervisory will get
direct employment, similar or more number of
persons will employed indirectly. This employment
has a positive impact on socio economic conditions of
the nearby villages as most of the work force will be
from the nearby areas. Local persons will be hired for
meeting the requirement of trucks loading, plantation,
etc., Drinking water, rest shelter and first aid will
provided to workers at quarry site as per the mines
act/rule.
6. PROPOSED INFRASTRUCTURE
(i) Industrial
area(Processing area):
Nil
(ii) Residential area (Non-
processing area)
As the workers are hired from the nearby villages, no
residential areas required.
(iii) Green Belt It is proposed to plant 20 Pongamiapinnata trees
along the lease boundary for which the maximum
survival rate would be 80%.
(iv) Social Infrastructure,
Connectivity (Traffic and
Transportation Road/
Rail/ Metro/Water ways
etc)
Given in section 4 (vii)
(vi) Drinking Water
Management (Source &
Supply of water)
Total Requirement – 6.0 KLD
Domestic – 2.0 KLD
Industrial, Green Belt & Dust suppression – 4.0
KLD
Source – Mineral Water Industries & Bore well
(vii) Sewerage System NA
(viii) Industrial Waste
Management
There is no generation of effluents/toxic substance
involved in the quarrying operations.
(ix) Solid Waste
Management:
NA
(x) Power Requirement &
Supply /source
The mining activities are envisaged to be carried out
only during day time. All the equipment shall be
operated with diesel as motive power.
PFR – Tvl. Yellow Stone Enterprises, Pudukkottai 21
Consultant: AADHI BOOMI MINING AND ENVIRO TECH (P) LTD, SALEM, TN
7. REHABILITATION AND RESETTLEMENT (R & R) PLAN
(i) Policy to be adopted
(Central/State) in respect
of the project affected
persons including home
out sees, land out sees and
landless labourers (a brief
outline to be given)
Due to nature of occurrence of massive granite
formation, the depth persistence of the granite body
in this quarry is beyond workable limits. In the
proposed scheme of mining only 6m depth (1m
topsoil + 5m Multicolor granite) has been envisaged
as workable depth for safe, systematic and economic
mining. Hence after quarry reaches the ultimate pit
limit of 26 m depth during the entire lease period,
the proposed waste will be dumped along the quarry
barrier in south eastern portion to form safety bund
and barbed wire fencing will be erected to maintain
safety around the quarried area.
8. PROJECT SCHEDULE & COST ESTIMATES
(i) Likely date of start of
construction and likely date of
completion (Time schedule
for the project to be given)
The mining operation is being done since the
execution of lease deed i.e., 04.10.2001
(ii) Estimated project cost Particulars Cost
Environment Monitoring Rs 75,000
Occupational Health Checkup Rs 70,000
Safety kits Rs 75,000
Water sprinkling Rs 75,000
Afforestation Rs 3,80,000
Total Rs 6.75
lakhs
Project Cost: Rs 155.75 lakhs
PFR – Tvl. Yellow Stone Enterprises, Pudukkottai 22
Consultant: AADHI BOOMI MINING AND ENVIRO TECH (P) LTD, SALEM, TN
9. Analysis of proposal (Final Recommendation)
(i) Financial and social benefits with
special emphasis on the benefit to
the local people including tribal
population, if any in the areas
The mining activities in this belt will benefit
to the local people both directly and
indirectly. The direct beneficiaries will be
those who get employed in the mines as
skilled and un-skilled workers. There will
be no environmental impact from the
project since the scale of operation is very
minimum and the method of mining by
manual. This operation doesn’t need
relocation of any habitants. The proponent
will plant sufficient number of trees around
the lease boundary as well as along the
village roads to keep the environment
green.
(Tvl.Yellow Stone Enterprises)
(S. SURIYA KUMAR)
M.Sc., M.Phil, F.C.C. (Min) PGDBA, DIPC
EIA Co-ordinator (Mining)
Date : 19.05.2017
Place: Salem