County: Let Date:
Type: Bid No:
Time: Project ID:
Highway: Contract #:
Length: CCSJ:
From: To:
Estimate $ 168,951,004.96
Bidder 1 $ 202,548,591.57
Bidder 2 $ 233,445,739.29
Bidder 3 $ 252,286,943.96
Bidder 4 $ 279,428,828.61
Bidder 5 $ 289,374,971.13
Item CodeUnit Quantity Unit Est. Bidder Unit Bid
STATION 887.35 800.00 1 1,144.00
2 2,000.00
3 26,475.00
4 6,000.00
5 32,000.00
EACH 2.00 2,000.00 1 5,000.00
2 2,000.00
3 5,000.00
4 1,630.00
5 3,500.00
SQUARE YARD 518.00 10.00 1 5.00
2 9.00
3 10.00
4 15.00
5 10.20
SQUARE YARD 485.00 15.00 1 4.00
2 18.00
3 10.00
4 15.50
5 12.20
SQUARE YARD 2,262.00 12.00 1 2.00
2 8.00
3 11.00
4 6.35
5 10.20
SQUARE YARD 11.00 40.00 1 7.00
2 15.00
3 75.00
4 23.00
5 76.25
SQUARE YARD 3,284.00 60.00 1 3.00
2 26.00
3 5.00
4 6.90
5 8.10
SQUARE YARD 131.00 9.00 1 2.00
2 12.00
3 10.00
4 14.00
5 7.60
104-6011 REMOVING CONC (MEDIANS)
104-6013 REMOVING CONC (FOUNDATIONS)
104-6015 REMOVING CONC (SIDEWALKS)
100-6002
103-6001 DISPOSAL OF WATER WELLS
104-6001 REMOVING CONC (PAV)
104-6003 REMOVING CONC (FLOORS)
104-6009 REMOVING CONC (RIPRAP)
Exibit 2. Tabulation of Bids for HCRMA BID #2017-002 for the 365 Toll Project
Contract No. 0921-02-368
PREPARING ROW
11/10/2017
HCRMA #2017-002365 TOLL (SEGS. 1 & 2)
0921-02-368
0921-02-368
71%
Description
Johnson Bros Corp., a Southland Company
Anderson Columbia Company, Inc.
Pulice
Webber, LLC
% Over/Under
20%
38%
49%
Company
1264 CALENDAR DAYS
HIDALGO
0.07 mi north of US 281 (Military Highway)
Lane-Abrams Toll 365 Joint Venture
CONTROLLED ACCESS TOLL FACILITY
0.58 mi west of FM 396 (Anzalduas Hwy)
12.22
365TOLL
65%
Date Prepared: 11/10/2017 Page: 1 of 61
County: Let Date:
Type: Bid No:
Time: Project ID:
Highway: Contract #:
Length: CCSJ:
From: To:
Estimate $ 168,951,004.96
Bidder 1 $ 202,548,591.57
Bidder 2 $ 233,445,739.29
Bidder 3 $ 252,286,943.96
Bidder 4 $ 279,428,828.61
Bidder 5 $ 289,374,971.13
Item CodeUnit Quantity Unit Est. Bidder Unit Bid
Exibit 2. Tabulation of Bids for HCRMA BID #2017-002 for the 365 Toll Project
Contract No. 0921-02-368
11/10/2017
HCRMA #2017-002365 TOLL (SEGS. 1 & 2)
0921-02-368
0921-02-368
71%
Description
Johnson Bros Corp., a Southland Company
Anderson Columbia Company, Inc.
Pulice
Webber, LLC
% Over/Under
20%
38%
49%
Company
1264 CALENDAR DAYS
HIDALGO
0.07 mi north of US 281 (Military Highway)
Lane-Abrams Toll 365 Joint Venture
CONTROLLED ACCESS TOLL FACILITY
0.58 mi west of FM 396 (Anzalduas Hwy)
12.22
365TOLL
65%
SQUARE YARD 99.00 40.00 1 2.00
2 10.00
3 10.00
4 20.00
5 12.20
LINEAR FOOT 2,125.00 5.00 1 4.00
2 5.00
3 5.00
4 3.85
5 4.80
LINEAR FOOT 1,828.00 4.00 1 4.00
2 5.00
3 5.00
4 3.70
5 4.60
LINEAR FOOT 174.00 7.00 1 7.00
2 5.00
3 5.00
4 10.00
5 4.60
SQUARE YARD 75,668.00 1.75 1 2.00
2 2.50
3 2.25
4 2.15
5 0.85
CUBIC YARD 268,066.00 3.75 1 1.75
2 3.50
3 2.50
4 3.00
5 5.40
CUBIC YARD 68,704.00 3.75 1 2.00
2 6.00
3 4.25
4 5.05
5 7.00
CUBIC YARD 11,286.00 6.50 1 4.75
2 15.00
3 5.75
4 1.00
5 8.00
132-6005 EMBANKMENT (FINAL)(ORD COMP)(TY C)
104-6022 REMOVING CONC (CURB AND GUTTER)
104-6026 REMOVE CONC (GUTTER)
106-6002 OBLITERATING ABANDONED ROAD
110-6001 EXCAVATION (ROADWAY)
110-6002 EXCAVATION (CHANNEL)
104-6017 REMOVING CONC (DRIVEWAYS)
104-6021 REMOVING CONC (CURB)
Date Prepared: 11/10/2017 Page: 2 of 61
County: Let Date:
Type: Bid No:
Time: Project ID:
Highway: Contract #:
Length: CCSJ:
From: To:
Estimate $ 168,951,004.96
Bidder 1 $ 202,548,591.57
Bidder 2 $ 233,445,739.29
Bidder 3 $ 252,286,943.96
Bidder 4 $ 279,428,828.61
Bidder 5 $ 289,374,971.13
Item CodeUnit Quantity Unit Est. Bidder Unit Bid
Exibit 2. Tabulation of Bids for HCRMA BID #2017-002 for the 365 Toll Project
Contract No. 0921-02-368
11/10/2017
HCRMA #2017-002365 TOLL (SEGS. 1 & 2)
0921-02-368
0921-02-368
71%
Description
Johnson Bros Corp., a Southland Company
Anderson Columbia Company, Inc.
Pulice
Webber, LLC
% Over/Under
20%
38%
49%
Company
1264 CALENDAR DAYS
HIDALGO
0.07 mi north of US 281 (Military Highway)
Lane-Abrams Toll 365 Joint Venture
CONTROLLED ACCESS TOLL FACILITY
0.58 mi west of FM 396 (Anzalduas Hwy)
12.22
365TOLL
65%
CUBIC YARD 3,572,925.00 4.50 1 5.00
2 6.00
3 7.10
4 8.80
5 11.00
ACRE 336.46 800.00 1 300.00
2 1,100.00
3 1,100.00
4 590.00
5 880.00
ACRE 325.75 800.00 1 300.00
2 700.00
3 700.00
4 590.00
5 880.00
1000 GAL 49,761.00 10.00 1 3.00
2 25.00
3 24.00
4 21.00
5 18.20
SQUARE YARD 383,206.00 1.00 1 1.30
2 1.40
3 1.30
4 1.35
5 1.30
1000 GAL 15,123.00 8.00 1 3.50
2 1.00
3 10.00
4 23.00
5 18.20
CUBIC YARD 16,380.00 22.00 1 40.00
2 25.00
3 28.00
4 41.00
5 23.00
SQUARE YARD 620.00 1.50 1 4.00
2 3.00
3 6.00
4 14.00
5 11.80
169-6004 SOIL RETENTION BLANKETS (CL 1) (TY D)
204-6003 SPRINKLING (DUST CONTROL)
247-6225 FL BS (RDWY DEL)(TY E GR 4)(FNAL POS)
251-6122 REWORK BS MTL (TY C)(9.5")(DENS
CONT)
132-6006 EMBANKMENT (FINAL)(DENS CONT)(TY
C)
164-6036 DRILL SEEDING (PERM) (RURAL) (CLAY)
164-6042 DRILL SEEDING (TEMP) (WARM)
168-6001 VEGETATIVE WATERING
Date Prepared: 11/10/2017 Page: 3 of 61
County: Let Date:
Type: Bid No:
Time: Project ID:
Highway: Contract #:
Length: CCSJ:
From: To:
Estimate $ 168,951,004.96
Bidder 1 $ 202,548,591.57
Bidder 2 $ 233,445,739.29
Bidder 3 $ 252,286,943.96
Bidder 4 $ 279,428,828.61
Bidder 5 $ 289,374,971.13
Item CodeUnit Quantity Unit Est. Bidder Unit Bid
Exibit 2. Tabulation of Bids for HCRMA BID #2017-002 for the 365 Toll Project
Contract No. 0921-02-368
11/10/2017
HCRMA #2017-002365 TOLL (SEGS. 1 & 2)
0921-02-368
0921-02-368
71%
Description
Johnson Bros Corp., a Southland Company
Anderson Columbia Company, Inc.
Pulice
Webber, LLC
% Over/Under
20%
38%
49%
Company
1264 CALENDAR DAYS
HIDALGO
0.07 mi north of US 281 (Military Highway)
Lane-Abrams Toll 365 Joint Venture
CONTROLLED ACCESS TOLL FACILITY
0.58 mi west of FM 396 (Anzalduas Hwy)
12.22
365TOLL
65%
SQUARE YARD 167,789.00 1.00 1 2.00
2 1.20
3 1.70
4 2.10
5 1.70
SQUARE YARD 942,799.00 1.25 1 1.50
2 1.90
3 1.85
4 2.15
5 2.00
TON 27,938.40 140.00 1 200.00
2 126.00
3 155.00
4 196.00
5 120.00
SQUARE YARD 39,964.00 3.50 1 1.25
2 1.80
3 1.75
4 9.85
5 2.60
TON 590.00 150.00 1 160.00
2 132.80
3 138.00
4 182.00
5 153.00
CUBIC YARD 147,208.00 60.00 1 65.00
2 81.00
3 76.00
4 102.00
5 88.00
SQUARE YARD 24,588.00 2.00 1 1.50
2 2.00
3 2.00
4 2.00
5 1.50
GALLON 220,296.00 3.00 1 3.50
2 3.00
3 3.10
4 3.45
5 3.15
305-6016 SALV, HAUL & STKPL RCL APH PV (3")
310-6009 PRIME COAT (MC-30)
260-6011 LIME TRT (EXST MATL) (12")
260-6043 LIME (HYD, COM OR QK)(SLURRY)
260-6054 LIME TRT (NEW BASE)(10")
275-6001 CEMENT
276-6057 CM TRT(PT MX)(CL L)(TYA)(GR1-2)(FN
POS)
260-6006 LIME TRT (EXST MATL) (6")
Date Prepared: 11/10/2017 Page: 4 of 61
County: Let Date:
Type: Bid No:
Time: Project ID:
Highway: Contract #:
Length: CCSJ:
From: To:
Estimate $ 168,951,004.96
Bidder 1 $ 202,548,591.57
Bidder 2 $ 233,445,739.29
Bidder 3 $ 252,286,943.96
Bidder 4 $ 279,428,828.61
Bidder 5 $ 289,374,971.13
Item CodeUnit Quantity Unit Est. Bidder Unit Bid
Exibit 2. Tabulation of Bids for HCRMA BID #2017-002 for the 365 Toll Project
Contract No. 0921-02-368
11/10/2017
HCRMA #2017-002365 TOLL (SEGS. 1 & 2)
0921-02-368
0921-02-368
71%
Description
Johnson Bros Corp., a Southland Company
Anderson Columbia Company, Inc.
Pulice
Webber, LLC
% Over/Under
20%
38%
49%
Company
1264 CALENDAR DAYS
HIDALGO
0.07 mi north of US 281 (Military Highway)
Lane-Abrams Toll 365 Joint Venture
CONTROLLED ACCESS TOLL FACILITY
0.58 mi west of FM 396 (Anzalduas Hwy)
12.22
365TOLL
65%
GALLON 17,050.00 3.50 1 3.00
2 4.25
3 2.65
4 2.95
5 2.70
CUBIC YARD 368.00 90.00 1 94.00
2 74.00
3 85.00
4 95.00
5 84.00
TON 53,222.00 65.00 1 69.00
2 64.00
3 62.00
4 70.00
5 66.00
TON 9,028.00 75.00 1 84.00
2 79.00
3 76.00
4 85.00
5 75.00
SQUARE YARD 7,693.00 2.60 1 2.50
2 4.00
3 2.20
4 2.45
5 2.10
SQUARE YARD 91,398.00 45.00 1 45.00
2 46.00
3 50.00
4 54.30
5 43.50
SQUARE YARD 551,331.00 38.00 1 52.00
2 58.00
3 56.00
4 64.00
5 55.50
SQUARE YARD 168,057.00 40.00 1 50.00
2 52.00
3 53.00
4 60.00
5 53.00
341-6047 D-GR HMA TY-D SAC-A PG76-22
354-6051 PLANE ASPH CONC PAV (0" TO 1 1/2")
360-6004 CONC PVMT (CONT REINF - CRCP) (10")
360-6007 CONC PVMT (CONT REINF - CRCP) (13")
360-6014 CONC PVMT (CONT REINF - CRCP) (11.5")
316-6004 ASPH (TIER I)
316-6126 AGGR(TY-PB GR-4 SAC-A)
341-6039 D-GR HMA TY-D SAC-B PG64-22
Date Prepared: 11/10/2017 Page: 5 of 61
County: Let Date:
Type: Bid No:
Time: Project ID:
Highway: Contract #:
Length: CCSJ:
From: To:
Estimate $ 168,951,004.96
Bidder 1 $ 202,548,591.57
Bidder 2 $ 233,445,739.29
Bidder 3 $ 252,286,943.96
Bidder 4 $ 279,428,828.61
Bidder 5 $ 289,374,971.13
Item CodeUnit Quantity Unit Est. Bidder Unit Bid
Exibit 2. Tabulation of Bids for HCRMA BID #2017-002 for the 365 Toll Project
Contract No. 0921-02-368
11/10/2017
HCRMA #2017-002365 TOLL (SEGS. 1 & 2)
0921-02-368
0921-02-368
71%
Description
Johnson Bros Corp., a Southland Company
Anderson Columbia Company, Inc.
Pulice
Webber, LLC
% Over/Under
20%
38%
49%
Company
1264 CALENDAR DAYS
HIDALGO
0.07 mi north of US 281 (Military Highway)
Lane-Abrams Toll 365 Joint Venture
CONTROLLED ACCESS TOLL FACILITY
0.58 mi west of FM 396 (Anzalduas Hwy)
12.22
365TOLL
65%
SQUARE YARD 3,890.00 38.00 1 70.00
2 80.00
3 71.00
4 104.00
5 76.00
CUBIC YARD 4,682.50 52.00 1 75.00
2 70.00
3 72.00
4 157.00
5 84.00
SQUARE YARD 929.00 100.00 1 55.00
2 50.00
3 15.00
4 59.00
5 55.75
CUBIC YARD 7,507.00 30.00 1 50.00
2 50.00
3 17.00
4 38.00
5 45.75
CUBIC YARD 15,765.00 40.00 1 10.00
2 20.00
3 18.00
4 23.00
5 15.20
LINEAR FOOT 34,980.00 1.00 1 1.00
2 2.50
3 1.00
4 1.80
5 0.75
LINEAR FOOT 2,016.00 100.00 1 100.00
2 75.00
3 80.00
4 100.00
5 70.75
LINEAR FOOT 660.00 150.00 1 200.00
2 77.00
3 90.00
4 141.00
5 76.25
402-6001 TRENCH EXCAVATION PROTECTION
409-6001 PRESTR CONC PIL (16 IN SQ)
409-6002 PRESTR CONC PIL (18 IN SQ)
360-9001 CONC PVMT (CONT REINF - CRCP)(13")SPL
400-6005 CEM STABIL BKFL
400-6006 CUT & RESTORING PAV
400-6010 STRUCT EXCAV (SPECIAL)
400-6011 SAND BACKFILL
Date Prepared: 11/10/2017 Page: 6 of 61
County: Let Date:
Type: Bid No:
Time: Project ID:
Highway: Contract #:
Length: CCSJ:
From: To:
Estimate $ 168,951,004.96
Bidder 1 $ 202,548,591.57
Bidder 2 $ 233,445,739.29
Bidder 3 $ 252,286,943.96
Bidder 4 $ 279,428,828.61
Bidder 5 $ 289,374,971.13
Item CodeUnit Quantity Unit Est. Bidder Unit Bid
Exibit 2. Tabulation of Bids for HCRMA BID #2017-002 for the 365 Toll Project
Contract No. 0921-02-368
11/10/2017
HCRMA #2017-002365 TOLL (SEGS. 1 & 2)
0921-02-368
0921-02-368
71%
Description
Johnson Bros Corp., a Southland Company
Anderson Columbia Company, Inc.
Pulice
Webber, LLC
% Over/Under
20%
38%
49%
Company
1264 CALENDAR DAYS
HIDALGO
0.07 mi north of US 281 (Military Highway)
Lane-Abrams Toll 365 Joint Venture
CONTROLLED ACCESS TOLL FACILITY
0.58 mi west of FM 396 (Anzalduas Hwy)
12.22
365TOLL
65%
LINEAR FOOT 6,992.00 80.00 1 93.00
2 78.00
3 100.00
4 89.00
5 85.50
LINEAR FOOT 1,424.00 60.00 1 42.00
2 120.00
3 70.00
4 66.00
5 115.00
LINEAR FOOT 160.00 150.00 1 100.00
2 260.00
3 300.00
4 136.00
5 150.00
LINEAR FOOT 15,503.00 145.00 1 147.00
2 180.00
3 200.00
4 160.00
5 170.00
LINEAR FOOT 9,092.00 170.00 1 200.00
2 220.00
3 300.00
4 230.00
5 220.00
LINEAR FOOT 3,148.00 360.00 1 410.00
2 420.00
3 500.00
4 465.00
5 400.00
LINEAR FOOT 1,882.00 400.00 1 600.00
2 680.00
3 700.00
4 670.00
5 550.00
LINEAR FOOT 672.00 700.00 1 800.00
2 970.00
3 600.00
4 900.00
5 700.00
416-6012 DRILL SHAFT (84 IN)
416-6003 DRILL SHAFT (30 IN)
416-6004 DRILL SHAFT (36 IN)
416-6005 DRILL SHAFT (42 IN)
416-6008 DRILL SHAFT (60 IN)
416-6010 DRILL SHAFT (72 IN)
409-6003 PRESTR CONC PIL (20 IN SQ)
416-6001 DRILL SHAFT (18 IN)
Date Prepared: 11/10/2017 Page: 7 of 61
County: Let Date:
Type: Bid No:
Time: Project ID:
Highway: Contract #:
Length: CCSJ:
From: To:
Estimate $ 168,951,004.96
Bidder 1 $ 202,548,591.57
Bidder 2 $ 233,445,739.29
Bidder 3 $ 252,286,943.96
Bidder 4 $ 279,428,828.61
Bidder 5 $ 289,374,971.13
Item CodeUnit Quantity Unit Est. Bidder Unit Bid
Exibit 2. Tabulation of Bids for HCRMA BID #2017-002 for the 365 Toll Project
Contract No. 0921-02-368
11/10/2017
HCRMA #2017-002365 TOLL (SEGS. 1 & 2)
0921-02-368
0921-02-368
71%
Description
Johnson Bros Corp., a Southland Company
Anderson Columbia Company, Inc.
Pulice
Webber, LLC
% Over/Under
20%
38%
49%
Company
1264 CALENDAR DAYS
HIDALGO
0.07 mi north of US 281 (Military Highway)
Lane-Abrams Toll 365 Joint Venture
CONTROLLED ACCESS TOLL FACILITY
0.58 mi west of FM 396 (Anzalduas Hwy)
12.22
365TOLL
65%
LINEAR FOOT 28.00 200.00 1 45.00
2 120.00
3 110.00
4 123.00
5 100.00
LINEAR FOOT 755.00 135.00 1 63.00
2 180.00
3 160.00
4 135.00
5 135.00
LINEAR FOOT 76.00 450.00 1 270.00
2 220.00
3 210.00
4 370.00
5 390.00
LINEAR FOOT 698.00 275.00 1 326.00
2 300.00
3 230.00
4 290.00
5 420.00
LINEAR FOOT 827.00 300.00 1 420.00
2 380.00
3 373.00
4 360.00
5 495.00
LINEAR FOOT 190.00 525.00 1 565.00
2 480.00
3 471.00
4 400.00
5 580.00
LINEAR FOOT 495.00 510.00 1 650.00
2 600.00
3 582.00
4 540.00
5 750.00
LINEAR FOOT 1,320.00 130.00 1 100.00
2 260.00
3 230.00
4 131.00
5 165.00
416-6022 DRILL SHAFT (SIGN MTS) (48 IN)
416-6023 DRILL SHAFT (SIGN MTS) (54 IN)
416-6026 DRILL SHAFT (HIGH MAST POLE) (60 IN)
416-6029 DRILL SHAFT (RDWY ILL POLE) (30 IN)
416-6016 DRILL SHAFT (SIGN MTS) (12 IN)
416-6018 DRILL SHAFT (SIGN MTS) (24 IN)
416-6020 DRILL SHAFT (SIGN MTS) (36 IN)
416-6021 DRILL SHAFT (SIGN MTS) (42 IN)
Date Prepared: 11/10/2017 Page: 8 of 61
County: Let Date:
Type: Bid No:
Time: Project ID:
Highway: Contract #:
Length: CCSJ:
From: To:
Estimate $ 168,951,004.96
Bidder 1 $ 202,548,591.57
Bidder 2 $ 233,445,739.29
Bidder 3 $ 252,286,943.96
Bidder 4 $ 279,428,828.61
Bidder 5 $ 289,374,971.13
Item CodeUnit Quantity Unit Est. Bidder Unit Bid
Exibit 2. Tabulation of Bids for HCRMA BID #2017-002 for the 365 Toll Project
Contract No. 0921-02-368
11/10/2017
HCRMA #2017-002365 TOLL (SEGS. 1 & 2)
0921-02-368
0921-02-368
71%
Description
Johnson Bros Corp., a Southland Company
Anderson Columbia Company, Inc.
Pulice
Webber, LLC
% Over/Under
20%
38%
49%
Company
1264 CALENDAR DAYS
HIDALGO
0.07 mi north of US 281 (Military Highway)
Lane-Abrams Toll 365 Joint Venture
CONTROLLED ACCESS TOLL FACILITY
0.58 mi west of FM 396 (Anzalduas Hwy)
12.22
365TOLL
65%
LINEAR FOOT 34.20 130.00 1 65.00
2 200.00
3 175.00
4 122.00
5 135.00
LINEAR FOOT 522.20 210.00 1 235.00
2 450.00
3 415.00
4 230.00
5 295.00
LINEAR FOOT 154.00 410.00 1 410.00
2 720.00
3 650.00
4 440.00
5 495.00
CUBIC YARD 1,601.20 775.00 1 750.00
2 900.00
3 590.00
4 830.00
5 900.00
CUBIC YARD 3,187.10 800.00 1 900.00
2 1,000.00
3 650.00
4 940.00
5 850.00
CUBIC YARD 767.80 750.00 1 1,100.00
2 800.00
3 650.00
4 860.00
5 800.00
CUBIC YARD 525.00 850.00 1 830.00
2 950.00
3 700.00
4 990.00
5 650.00
CUBIC YARD 330.30 750.00 1 490.00
2 600.00
3 350.00
4 700.00
5 600.00
420-6037 CL C CONC (COLUMN)
420-6043 CL C CONC (FOOTING)
416-6032 DRILL SHAFT (TRF SIG POLE) (36 IN)
416-6034 DRILL SHAFT (TRF SIG POLE) (48 IN)
420-6013 CL C CONC (ABUT)
420-6025 CL C CONC (BENT)
420-6029 CL C CONC (CAP)
416-6030 DRILL SHAFT (TRF SIG POLE) (24 IN)
Date Prepared: 11/10/2017 Page: 9 of 61
County: Let Date:
Type: Bid No:
Time: Project ID:
Highway: Contract #:
Length: CCSJ:
From: To:
Estimate $ 168,951,004.96
Bidder 1 $ 202,548,591.57
Bidder 2 $ 233,445,739.29
Bidder 3 $ 252,286,943.96
Bidder 4 $ 279,428,828.61
Bidder 5 $ 289,374,971.13
Item CodeUnit Quantity Unit Est. Bidder Unit Bid
Exibit 2. Tabulation of Bids for HCRMA BID #2017-002 for the 365 Toll Project
Contract No. 0921-02-368
11/10/2017
HCRMA #2017-002365 TOLL (SEGS. 1 & 2)
0921-02-368
0921-02-368
71%
Description
Johnson Bros Corp., a Southland Company
Anderson Columbia Company, Inc.
Pulice
Webber, LLC
% Over/Under
20%
38%
49%
Company
1264 CALENDAR DAYS
HIDALGO
0.07 mi north of US 281 (Military Highway)
Lane-Abrams Toll 365 Joint Venture
CONTROLLED ACCESS TOLL FACILITY
0.58 mi west of FM 396 (Anzalduas Hwy)
12.22
365TOLL
65%
CUBIC YARD 28.00 800.00 1 450.00
2 450.00
3 350.00
4 450.00
5 500.00
CUBIC YARD 25.90 1,200.00 1 1,200.00
2 450.00
3 800.00
4 1,370.00
5 3,000.00
CUBIC YARD 119.00 800.00 1 430.00
2 450.00
3 350.00
4 470.00
5 500.00
SQUARE FOOT 448,042.00 12.50 1 16.50
2 17.00
3 13.00
4 18.50
5 17.00
CUBIC YARD 2,102.43 400.00 1 335.00
2 500.00
3 370.00
4 530.00
5 500.00
SQUARE FOOT 463,168.00 35.00 1 42.50
2 70.00
3 54.00
4 68.00
5 56.00
LINEAR FOOT 2,075.76 175.00 1 135.00
2 150.00
3 108.00
4 131.00
5 120.00
LINEAR FOOT 1,890.00 150.00 1 157.00
2 165.00
3 30.00
4 152.00
5 125.00
422-6001 REINF CONC SLAB
422-6015 APPROACH SLAB
423-6001 RETAINING WALL (MSE)
425-6036 PRESTR CONC GIRDER (TX34)
425-6037 PRESTR CONC GIRDER (TX40)
420-6066 CL C CONC (RAIL FOUNDATION)
420-9001 CLASS CLASS "D" CONC (MISC)
420-9010 CL C CONC (RAIL FOUNDATION)SPL
Date Prepared: 11/10/2017 Page: 10 of 61
County: Let Date:
Type: Bid No:
Time: Project ID:
Highway: Contract #:
Length: CCSJ:
From: To:
Estimate $ 168,951,004.96
Bidder 1 $ 202,548,591.57
Bidder 2 $ 233,445,739.29
Bidder 3 $ 252,286,943.96
Bidder 4 $ 279,428,828.61
Bidder 5 $ 289,374,971.13
Item CodeUnit Quantity Unit Est. Bidder Unit Bid
Exibit 2. Tabulation of Bids for HCRMA BID #2017-002 for the 365 Toll Project
Contract No. 0921-02-368
11/10/2017
HCRMA #2017-002365 TOLL (SEGS. 1 & 2)
0921-02-368
0921-02-368
71%
Description
Johnson Bros Corp., a Southland Company
Anderson Columbia Company, Inc.
Pulice
Webber, LLC
% Over/Under
20%
38%
49%
Company
1264 CALENDAR DAYS
HIDALGO
0.07 mi north of US 281 (Military Highway)
Lane-Abrams Toll 365 Joint Venture
CONTROLLED ACCESS TOLL FACILITY
0.58 mi west of FM 396 (Anzalduas Hwy)
12.22
365TOLL
65%
LINEAR FOOT 48,168.24 130.00 1 138.00
2 160.00
3 130.00
4 150.00
5 130.00
CUBIC YARD 10,767.30 300.00 1 280.00
2 350.00
3 350.00
4 375.00
5 315.00
CUBIC YARD 477.00 300.00 1 260.00
2 500.00
3 350.00
4 410.00
5 325.00
CUBIC YARD 481.00 300.00 1 270.00
2 270.00
3 350.00
4 450.00
5 340.00
CUBIC YARD 100.00 300.00 1 320.00
2 360.00
3 350.00
4 430.00
5 325.00
CUBIC YARD 42.51 300.00 1 450.00
2 340.00
3 350.00
4 440.00
5 325.00
CUBIC YARD 110.00 150.00 1 275.00
2 90.00
3 170.00
4 114.00
5 175.00
CUBIC YARD 577.00 300.00 1 350.00
2 360.00
3 350.00
4 415.00
5 325.00
432-6009 RIPRAP (CONC) (CL B) (4")
432-6024 RIPRAP (STONE COMMON)(DRY)(12 IN)
432-6044 RIPRAP (CONC)(FLUME)
425-6039 PRESTR CONC GIRDER (TX54)
432-6001 RIPRAP (CONC)(4 IN)
432-6002 RIPRAP (CONC)(5 IN)
432-6003 RIPRAP (CONC)(6 IN)
432-6006 RIPRAP (CONC)(CL B)
Date Prepared: 11/10/2017 Page: 11 of 61
County: Let Date:
Type: Bid No:
Time: Project ID:
Highway: Contract #:
Length: CCSJ:
From: To:
Estimate $ 168,951,004.96
Bidder 1 $ 202,548,591.57
Bidder 2 $ 233,445,739.29
Bidder 3 $ 252,286,943.96
Bidder 4 $ 279,428,828.61
Bidder 5 $ 289,374,971.13
Item CodeUnit Quantity Unit Est. Bidder Unit Bid
Exibit 2. Tabulation of Bids for HCRMA BID #2017-002 for the 365 Toll Project
Contract No. 0921-02-368
11/10/2017
HCRMA #2017-002365 TOLL (SEGS. 1 & 2)
0921-02-368
0921-02-368
71%
Description
Johnson Bros Corp., a Southland Company
Anderson Columbia Company, Inc.
Pulice
Webber, LLC
% Over/Under
20%
38%
49%
Company
1264 CALENDAR DAYS
HIDALGO
0.07 mi north of US 281 (Military Highway)
Lane-Abrams Toll 365 Joint Venture
CONTROLLED ACCESS TOLL FACILITY
0.58 mi west of FM 396 (Anzalduas Hwy)
12.22
365TOLL
65%
CUBIC YARD 3,266.44 300.00 1 340.00
2 360.00
3 350.00
4 425.00
5 315.00
EACH 10.00 2,500.00 1 2,100.00
2 1,000.00
3 1,700.00
4 1,200.00
5 2,560.00
EACH 10.00 2,070.00 1 2,100.00
2 1,800.00
3 1,700.00
4 2,400.00
5 3,350.00
EACH 10.00 2,070.00 1 2,100.00
2 1,800.00
3 1,700.00
4 2,400.00
5 3,360.00
EACH 10.00 2,500.00 1 2,100.00
2 1,500.00
3 1,700.00
4 2,100.00
5 3,080.00
POUND 2,931,330.00 1.40 1 1.32
2 1.70
3 1.45
4 1.85
5 1.50
POUND 2,573.00 6.50 1 4.00
2 7.00
3 8.50
4 15.50
5 15.00
LINEAR FOOT 90.00 150.00 1 71.00
2 120.00
3 100.00
4 132.00
5 149.00
450-6006 RAIL (TY T223)
434-6026 ELASTOMERIC BEARING (E7)
434-6035 ELASTOMERIC BEARING (F7)
434-6042 SLIDING ELASTOMERIC BEARING (ES 5)
442-6001 STR STEEL (PLATE GIRDER)
442-6007 STR STEEL (MISC NON - BRIDGE)
432-6045 RIPRAP (MOW STRIP)(4 IN)
434-6007 ELASTOMERIC BEARING (EE5)
Date Prepared: 11/10/2017 Page: 12 of 61
County: Let Date:
Type: Bid No:
Time: Project ID:
Highway: Contract #:
Length: CCSJ:
From: To:
Estimate $ 168,951,004.96
Bidder 1 $ 202,548,591.57
Bidder 2 $ 233,445,739.29
Bidder 3 $ 252,286,943.96
Bidder 4 $ 279,428,828.61
Bidder 5 $ 289,374,971.13
Item CodeUnit Quantity Unit Est. Bidder Unit Bid
Exibit 2. Tabulation of Bids for HCRMA BID #2017-002 for the 365 Toll Project
Contract No. 0921-02-368
11/10/2017
HCRMA #2017-002365 TOLL (SEGS. 1 & 2)
0921-02-368
0921-02-368
71%
Description
Johnson Bros Corp., a Southland Company
Anderson Columbia Company, Inc.
Pulice
Webber, LLC
% Over/Under
20%
38%
49%
Company
1264 CALENDAR DAYS
HIDALGO
0.07 mi north of US 281 (Military Highway)
Lane-Abrams Toll 365 Joint Venture
CONTROLLED ACCESS TOLL FACILITY
0.58 mi west of FM 396 (Anzalduas Hwy)
12.22
365TOLL
65%
LINEAR FOOT 44,479.70 40.00 1 30.00
2 46.00
3 55.00
4 45.00
5 60.00
LINEAR FOOT 100.00 60.00 1 35.00
2 58.00
3 55.00
4 101.00
5 60.00
LINEAR FOOT 848.00 60.00 1 36.00
2 60.00
3 80.00
4 67.00
5 90.00
LINEAR FOOT 240.00 75.00 1 40.00
2 60.00
3 80.00
4 102.00
5 90.00
LINEAR FOOT 2,633.10 75.00 1 95.00
2 100.00
3 85.00
4 79.00
5 74.75
LINEAR FOOT 169.00 110.00 1 126.00
2 134.00
3 138.00
4 143.00
5 127.00
LINEAR FOOT 313.00 300.00 1 245.00
2 320.00
3 190.00
4 300.00
5 234.00
LINEAR FOOT 812.00 280.00 1 270.00
2 340.00
3 200.00
4 320.00
5 250.00
454-6001 SEALED EXPANSION JOINT (4 IN) (SEJ - A)
454-6002 SEALED EXPANSION JOINT (5 IN) (SEJ - A)
462-6007 CONC BOX CULV (5 FT X 3 FT)
462-6008 CONC BOX CULV (5 FT X 4 FT)
450-6023 RAIL (TY SSTR)
450-6054 RAIL (TY SSTR) (W/DRAIN SLOTS)
450-9001 RAIL (TY SSTR) (W/DRAIN SLOTS)SPL
450-9002 RAIL (TY SSTR) SPL
Date Prepared: 11/10/2017 Page: 13 of 61
County: Let Date:
Type: Bid No:
Time: Project ID:
Highway: Contract #:
Length: CCSJ:
From: To:
Estimate $ 168,951,004.96
Bidder 1 $ 202,548,591.57
Bidder 2 $ 233,445,739.29
Bidder 3 $ 252,286,943.96
Bidder 4 $ 279,428,828.61
Bidder 5 $ 289,374,971.13
Item CodeUnit Quantity Unit Est. Bidder Unit Bid
Exibit 2. Tabulation of Bids for HCRMA BID #2017-002 for the 365 Toll Project
Contract No. 0921-02-368
11/10/2017
HCRMA #2017-002365 TOLL (SEGS. 1 & 2)
0921-02-368
0921-02-368
71%
Description
Johnson Bros Corp., a Southland Company
Anderson Columbia Company, Inc.
Pulice
Webber, LLC
% Over/Under
20%
38%
49%
Company
1264 CALENDAR DAYS
HIDALGO
0.07 mi north of US 281 (Military Highway)
Lane-Abrams Toll 365 Joint Venture
CONTROLLED ACCESS TOLL FACILITY
0.58 mi west of FM 396 (Anzalduas Hwy)
12.22
365TOLL
65%
LINEAR FOOT 373.00 325.00 1 280.00
2 360.00
3 220.00
4 340.00
5 260.00
LINEAR FOOT 620.00 400.00 1 382.00
2 440.00
3 290.00
4 430.00
5 360.00
LINEAR FOOT 172.00 600.00 1 554.00
2 420.00
3 430.00
4 410.00
5 520.00
LINEAR FOOT 1,316.00 750.00 1 755.00
2 670.00
3 575.00
4 700.00
5 665.00
LINEAR FOOT 546.00 1,000.00 1 755.00
2 900.00
3 600.00
4 900.00
5 660.00
LINEAR FOOT 438.00 1,500.00 1 1,290.00
2 1,400.00
3 1,050.00
4 1,350.00
5 1,190.00
LINEAR FOOT 1,671.00 40.00 1 42.00
2 36.00
3 40.00
4 35.00
5 39.50
LINEAR FOOT 312.00 80.00 1 55.00
2 38.00
3 45.00
4 37.00
5 50.75
464-6003 RC PIPE (CL III)(18 IN)
464-6004 RC PIPE (CL III)(21 IN)
462-6013 CONC BOX CULV (6 FT X 6 FT)
462-6017 CONC BOX CULV (7 FT X 6 FT)
462-6028 CONC BOX CULV (9 FT X 9 FT)
462-6032 CONC BOX CULV (10 FT X 8 FT)
462-6044 CONC BOX CULV (12 FT X 12 FT)
462-6009 CONC BOX CULV (5 FT X 5 FT)
Date Prepared: 11/10/2017 Page: 14 of 61
County: Let Date:
Type: Bid No:
Time: Project ID:
Highway: Contract #:
Length: CCSJ:
From: To:
Estimate $ 168,951,004.96
Bidder 1 $ 202,548,591.57
Bidder 2 $ 233,445,739.29
Bidder 3 $ 252,286,943.96
Bidder 4 $ 279,428,828.61
Bidder 5 $ 289,374,971.13
Item CodeUnit Quantity Unit Est. Bidder Unit Bid
Exibit 2. Tabulation of Bids for HCRMA BID #2017-002 for the 365 Toll Project
Contract No. 0921-02-368
11/10/2017
HCRMA #2017-002365 TOLL (SEGS. 1 & 2)
0921-02-368
0921-02-368
71%
Description
Johnson Bros Corp., a Southland Company
Anderson Columbia Company, Inc.
Pulice
Webber, LLC
% Over/Under
20%
38%
49%
Company
1264 CALENDAR DAYS
HIDALGO
0.07 mi north of US 281 (Military Highway)
Lane-Abrams Toll 365 Joint Venture
CONTROLLED ACCESS TOLL FACILITY
0.58 mi west of FM 396 (Anzalduas Hwy)
12.22
365TOLL
65%
LINEAR FOOT 4,848.00 60.00 1 50.00
2 46.00
3 56.00
4 46.00
5 46.75
LINEAR FOOT 1,545.00 70.00 1 66.00
2 62.00
3 70.00
4 61.00
5 62.00
LINEAR FOOT 1,557.00 80.00 1 82.00
2 82.00
3 80.00
4 81.00
5 76.75
LINEAR FOOT 958.00 115.00 1 102.00
2 110.00
3 136.00
4 106.00
5 96.50
LINEAR FOOT 600.00 140.00 1 127.00
2 125.00
3 145.00
4 122.00
5 120.00
LINEAR FOOT 4,286.00 62.00 1 54.00
2 47.00
3 65.00
4 47.00
5 51.25
LINEAR FOOT 11,480.00 40.00 1 44.00
2 34.00
3 55.00
4 32.00
5 41.00
LINEAR FOOT 4,325.00 60.00 1 53.00
2 42.00
3 60.00
4 41.00
5 46.75
464-6009 RC PIPE (CL III)(42 IN)
464-6010 RC PIPE (CL III)(48 IN)
464-6026 RC PIPE (CL V)(24 IN)
464-6038 RC PIPE (CL III)(18 IN)(SPL)
464-6039 RC PIPE (CL III)(24 IN)(SPL)
464-6005 RC PIPE (CL III)(24 IN)
464-6007 RC PIPE (CL III)(30 IN)
464-6008 RC PIPE (CL III)(36 IN)
Date Prepared: 11/10/2017 Page: 15 of 61
County: Let Date:
Type: Bid No:
Time: Project ID:
Highway: Contract #:
Length: CCSJ:
From: To:
Estimate $ 168,951,004.96
Bidder 1 $ 202,548,591.57
Bidder 2 $ 233,445,739.29
Bidder 3 $ 252,286,943.96
Bidder 4 $ 279,428,828.61
Bidder 5 $ 289,374,971.13
Item CodeUnit Quantity Unit Est. Bidder Unit Bid
Exibit 2. Tabulation of Bids for HCRMA BID #2017-002 for the 365 Toll Project
Contract No. 0921-02-368
11/10/2017
HCRMA #2017-002365 TOLL (SEGS. 1 & 2)
0921-02-368
0921-02-368
71%
Description
Johnson Bros Corp., a Southland Company
Anderson Columbia Company, Inc.
Pulice
Webber, LLC
% Over/Under
20%
38%
49%
Company
1264 CALENDAR DAYS
HIDALGO
0.07 mi north of US 281 (Military Highway)
Lane-Abrams Toll 365 Joint Venture
CONTROLLED ACCESS TOLL FACILITY
0.58 mi west of FM 396 (Anzalduas Hwy)
12.22
365TOLL
65%
LINEAR FOOT 1,861.00 70.00 1 66.00
2 58.00
3 80.00
4 57.00
5 63.00
LINEAR FOOT 3,157.00 80.00 1 88.00
2 77.00
3 110.00
4 95.00
5 83.25
LINEAR FOOT 2,013.00 115.00 1 109.00
2 100.00
3 150.00
4 99.00
5 104.00
LINEAR FOOT 1,888.00 125.00 1 127.00
2 122.00
3 170.00
4 122.00
5 123.00
LINEAR FOOT 20.00 250.00 1 155.00
2 200.00
3 140.00
4 191.00
5 147.00
LINEAR FOOT 2,042.00 225.00 1 184.00
2 180.00
3 230.00
4 174.00
5 174.00
LINEAR FOOT 425.00 60.00 1 54.00
2 38.00
3 66.00
4 37.00
5 119.00
LINEAR FOOT 1,201.00 125.00 1 80.00
2 72.00
3 100.00
4 70.00
5 74.50
464-6045 RC PIPE (CL III)(60 IN)(SPL)
464-6049 RC PIPE (CL IV)(21 IN)
464-6059 RC PIPE (CL V)(30 IN)
464-6040 RC PIPE (CL III)(30 IN)(SPL)
464-6041 RC PIPE (CL III)(36 IN)(SPL)
464-6042 RC PIPE (CL III)(42 IN)(SPL)
464-6043 RC PIPE (CL III)(48 IN)(SPL)
464-6044 RC PIPE (CL III)(54 IN)(SPL)
Date Prepared: 11/10/2017 Page: 16 of 61
County: Let Date:
Type: Bid No:
Time: Project ID:
Highway: Contract #:
Length: CCSJ:
From: To:
Estimate $ 168,951,004.96
Bidder 1 $ 202,548,591.57
Bidder 2 $ 233,445,739.29
Bidder 3 $ 252,286,943.96
Bidder 4 $ 279,428,828.61
Bidder 5 $ 289,374,971.13
Item CodeUnit Quantity Unit Est. Bidder Unit Bid
Exibit 2. Tabulation of Bids for HCRMA BID #2017-002 for the 365 Toll Project
Contract No. 0921-02-368
11/10/2017
HCRMA #2017-002365 TOLL (SEGS. 1 & 2)
0921-02-368
0921-02-368
71%
Description
Johnson Bros Corp., a Southland Company
Anderson Columbia Company, Inc.
Pulice
Webber, LLC
% Over/Under
20%
38%
49%
Company
1264 CALENDAR DAYS
HIDALGO
0.07 mi north of US 281 (Military Highway)
Lane-Abrams Toll 365 Joint Venture
CONTROLLED ACCESS TOLL FACILITY
0.58 mi west of FM 396 (Anzalduas Hwy)
12.22
365TOLL
65%
LINEAR FOOT 120.00 70.00 1 60.00
2 46.00
3 65.00
4 46.00
5 55.75
LINEAR FOOT 318.00 350.00 1 333.00
2 320.00
3 380.00
4 310.00
5 315.00
EACH 5.00 4,000.00 1 3,000.00
2 4,000.00
3 2,150.00
4 3,500.00
5 2,840.00
EACH 50.00 3,500.00 1 2,475.00
2 2,000.00
3 2,580.00
4 1,860.00
5 2,340.00
EACH 2.00 5,000.00 1 7,800.00
2 5,500.00
3 6,800.00
4 5,200.00
5 7,360.00
EACH 5.00 11,000.00 1 17,800.00
2 3,500.00
3 20,000.00
4 14,800.00
5 16,750.00
EACH 4.00 5,000.00 1 4,400.00
2 4,500.00
3 4,000.00
4 4,300.00
5 4,060.00
EACH 2.00 7,000.00 1 3,700.00
2 2,500.00
3 4,000.00
4 2,400.00
5 3,500.00
465-6051 INLET (COMPL)(POD)(SFG)(3FTX3FT)
465-6002 MANH (COMPL)(PRM)(48IN)
465-6005 JCTBOX(COMPL)(PJB)(3FTX3FT)
465-6011 JCTBOX(COMPL)(PJB)(6FTX6FT)
465-6012 JCTBOX(COMPL)(PJB)(8FTX8FT)
465-6025 INLET (COMPL)(PCO)(6FT)(NONE)
464-6060 RC PIPE (CL IV) (24 IN) (SPL)
464-6065 RC PIPE (CL IV) (72 IN) (SPL)
Date Prepared: 11/10/2017 Page: 17 of 61
County: Let Date:
Type: Bid No:
Time: Project ID:
Highway: Contract #:
Length: CCSJ:
From: To:
Estimate $ 168,951,004.96
Bidder 1 $ 202,548,591.57
Bidder 2 $ 233,445,739.29
Bidder 3 $ 252,286,943.96
Bidder 4 $ 279,428,828.61
Bidder 5 $ 289,374,971.13
Item CodeUnit Quantity Unit Est. Bidder Unit Bid
Exibit 2. Tabulation of Bids for HCRMA BID #2017-002 for the 365 Toll Project
Contract No. 0921-02-368
11/10/2017
HCRMA #2017-002365 TOLL (SEGS. 1 & 2)
0921-02-368
0921-02-368
71%
Description
Johnson Bros Corp., a Southland Company
Anderson Columbia Company, Inc.
Pulice
Webber, LLC
% Over/Under
20%
38%
49%
Company
1264 CALENDAR DAYS
HIDALGO
0.07 mi north of US 281 (Military Highway)
Lane-Abrams Toll 365 Joint Venture
CONTROLLED ACCESS TOLL FACILITY
0.58 mi west of FM 396 (Anzalduas Hwy)
12.22
365TOLL
65%
EACH 1.00 7,500.00 1 4,800.00
2 3,500.00
3 4,000.00
4 3,200.00
5 4,570.00
EACH 1.00 8,000.00 1 5,700.00
2 4,500.00
3 4,000.00
4 4,000.00
5 5,380.00
EACH 9.00 5,000.00 1 4,800.00
2 4,500.00
3 4,000.00
4 4,000.00
5 4,570.00
EACH 2.00 8,000.00 1 6,675.00
2 5,500.00
3 5,000.00
4 5,200.00
5 6,290.00
EACH 67.00 2,700.00 1 3,000.00
2 2,500.00
3 3,200.00
4 2,400.00
5 2,940.00
EACH 12.00 3,800.00 1 3,900.00
2 3,000.00
3 3,500.00
4 2,800.00
5 3,680.00
EACH 57.00 4,000.00 1 4,500.00
2 4,500.00
3 4,600.00
4 4,600.00
5 4,260.00
EACH 82.00 3,800.00 1 6,450.00
2 6,000.00
3 7,300.00
4 5,700.00
5 5,790.00
465-6126 INLET (COMPL)(PSL)(FG)(3FTX3FT-
3FTX3FT)
465-6130 INLET (COMPL)(PSL)(FG)(3FTX5FT-
3FTX5FT)
465-6139 INLET (COMPL)(PSL)(FG)(5FTX6FT-
3FTX5FT)
465-6142 INLET (COMPL)(PSL)(FG)(6FTX6FT-
3FTX5FT)
465-6058 INLET (COMPL)(PSL)(SL)(5FTX5FT)
465-6060 INLET (COMPL)(PSL)(SL)(6FTX6FT)
465-6074 INLET (COMPL)(PSL)(RC)(5FTX5FT)
465-6076 INLET (COMPL)(PSL)(RC)(6FTX6FT)
Date Prepared: 11/10/2017 Page: 18 of 61
County: Let Date:
Type: Bid No:
Time: Project ID:
Highway: Contract #:
Length: CCSJ:
From: To:
Estimate $ 168,951,004.96
Bidder 1 $ 202,548,591.57
Bidder 2 $ 233,445,739.29
Bidder 3 $ 252,286,943.96
Bidder 4 $ 279,428,828.61
Bidder 5 $ 289,374,971.13
Item CodeUnit Quantity Unit Est. Bidder Unit Bid
Exibit 2. Tabulation of Bids for HCRMA BID #2017-002 for the 365 Toll Project
Contract No. 0921-02-368
11/10/2017
HCRMA #2017-002365 TOLL (SEGS. 1 & 2)
0921-02-368
0921-02-368
71%
Description
Johnson Bros Corp., a Southland Company
Anderson Columbia Company, Inc.
Pulice
Webber, LLC
% Over/Under
20%
38%
49%
Company
1264 CALENDAR DAYS
HIDALGO
0.07 mi north of US 281 (Military Highway)
Lane-Abrams Toll 365 Joint Venture
CONTROLLED ACCESS TOLL FACILITY
0.58 mi west of FM 396 (Anzalduas Hwy)
12.22
365TOLL
65%
EACH 4.00 6,000.00 1 13,000.00
2 10,000.00
3 11,500.00
4 9,700.00
5 12,180.00
EACH 15.00 2,600.00 1 10,000.00
2 3,500.00
3 3,700.00
4 3,100.00
5 8,630.00
EACH 7.00 7,000.00 1 9,700.00
2 4,500.00
3 1,700.00
4 3,200.00
5 9,140.00
EACH 1.00 2,000.00 1 8,400.00
2 5,000.00
3 4,600.00
4 6,200.00
5 7,870.00
EACH 1.00 3,000.00 1 16,000.00
2 5,500.00
3 3,200.00
4 7,600.00
5 10,150.00
EACH 1.00 16,500.00 1 19,400.00
2 7,000.00
3 6,200.00
4 18,600.00
5 10,150.00
EACH 2.00 16,500.00 1 19,400.00
2 7,000.00
3 6,600.00
4 15,600.00
5 18,270.00
EACH 2.00 20,000.00 1 5,800.00
2 7,000.00
3 9,500.00
4 10,700.00
5 18,270.00
466-6107 HEADWALL (CH - PW - 0) (DIA= 72 IN)
466-6153 WINGWALL (FW - 0) (HW=6 FT)
465-9002 INLET (COMPL) (TY L1)
466-6002 HEADWALL (CH - FW - 0) (DIA= 15 IN)
466-6003 HEADWALL (CH - FW - 0) (DIA= 18 IN)
466-6007 HEADWALL (CH - FW - 0) (DIA= 30 IN)
466-6015 HEADWALL (CH - FW - 0) (DIA= 72 IN)
465-6145 INLET (COMPL)(PSL)(FG)(8FTX8FT-
3FTX5FT)
Date Prepared: 11/10/2017 Page: 19 of 61
County: Let Date:
Type: Bid No:
Time: Project ID:
Highway: Contract #:
Length: CCSJ:
From: To:
Estimate $ 168,951,004.96
Bidder 1 $ 202,548,591.57
Bidder 2 $ 233,445,739.29
Bidder 3 $ 252,286,943.96
Bidder 4 $ 279,428,828.61
Bidder 5 $ 289,374,971.13
Item CodeUnit Quantity Unit Est. Bidder Unit Bid
Exibit 2. Tabulation of Bids for HCRMA BID #2017-002 for the 365 Toll Project
Contract No. 0921-02-368
11/10/2017
HCRMA #2017-002365 TOLL (SEGS. 1 & 2)
0921-02-368
0921-02-368
71%
Description
Johnson Bros Corp., a Southland Company
Anderson Columbia Company, Inc.
Pulice
Webber, LLC
% Over/Under
20%
38%
49%
Company
1264 CALENDAR DAYS
HIDALGO
0.07 mi north of US 281 (Military Highway)
Lane-Abrams Toll 365 Joint Venture
CONTROLLED ACCESS TOLL FACILITY
0.58 mi west of FM 396 (Anzalduas Hwy)
12.22
365TOLL
65%
EACH 2.00 15,000.00 1 10,850.00
2 8,500.00
3 10,500.00
4 12,700.00
5 22,340.00
EACH 2.00 15,000.00 1 24,000.00
2 12,000.00
3 9,000.00
4 20,000.00
5 20,300.00
EACH 2.00 10,000.00 1 12,000.00
2 8,500.00
3 7,300.00
4 12,600.00
5 11,170.00
EACH 7.00 12,000.00 1 13,000.00
2 7,500.00
3 10,000.00
4 14,300.00
5 12,180.00
EACH 1.00 22,000.00 1 42,000.00
2 9,500.00
3 37,000.00
4 23,000.00
5 30,460.00
EACH 1.00 8,000.00 1 12,000.00
2 7,500.00
3 5,700.00
4 9,500.00
5 11,170.00
EACH 2.00 10,000.00 1 16,000.00
2 8,500.00
3 7,300.00
4 7,100.00
5 15,230.00
EACH 7.00 450.00 1 750.00
2 1,000.00
3 900.00
4 740.00
5 711.00
466-6181 WINGWALL (PW - 1) (HW=6 FT)
466-6200 WINGWALL (SW - 0) (HW=12 FT)
466-6208 WINGWALL (SW - 0) (HW=5 FT)
466-6211 WINGWALL (SW - 0) (HW=8 FT)
467-6356 SET (TY II) (18 IN) (RCP) (3: 1) (C)
466-6155 WINGWALL (FW - 0) (HW=8 FT)
466-6156 WINGWALL (FW - 0) (HW=9 FT)
466-6180 WINGWALL (PW - 1) (HW=5 FT)
Date Prepared: 11/10/2017 Page: 20 of 61
County: Let Date:
Type: Bid No:
Time: Project ID:
Highway: Contract #:
Length: CCSJ:
From: To:
Estimate $ 168,951,004.96
Bidder 1 $ 202,548,591.57
Bidder 2 $ 233,445,739.29
Bidder 3 $ 252,286,943.96
Bidder 4 $ 279,428,828.61
Bidder 5 $ 289,374,971.13
Item CodeUnit Quantity Unit Est. Bidder Unit Bid
Exibit 2. Tabulation of Bids for HCRMA BID #2017-002 for the 365 Toll Project
Contract No. 0921-02-368
11/10/2017
HCRMA #2017-002365 TOLL (SEGS. 1 & 2)
0921-02-368
0921-02-368
71%
Description
Johnson Bros Corp., a Southland Company
Anderson Columbia Company, Inc.
Pulice
Webber, LLC
% Over/Under
20%
38%
49%
Company
1264 CALENDAR DAYS
HIDALGO
0.07 mi north of US 281 (Military Highway)
Lane-Abrams Toll 365 Joint Venture
CONTROLLED ACCESS TOLL FACILITY
0.58 mi west of FM 396 (Anzalduas Hwy)
12.22
365TOLL
65%
EACH 89.00 500.00 1 754.00
2 1,000.00
3 1,000.00
4 740.00
5 711.00
EACH 12.00 800.00 1 754.00
2 1,000.00
3 900.00
4 740.00
5 711.00
EACH 3.00 1,000.00 1 754.00
2 1,000.00
3 950.00
4 760.00
5 711.00
EACH 73.00 450.00 1 754.00
2 1,000.00
3 1,250.00
4 760.00
5 711.00
EACH 84.00 800.00 1 754.00
2 1,000.00
3 1,250.00
4 760.00
5 711.00
EACH 16.00 1,000.00 1 915.00
2 1,200.00
3 1,100.00
4 1,010.00
5 1,020.00
EACH 4.00 1,000.00 1 1,076.00
2 1,200.00
3 1,100.00
4 1,010.00
5 863.00
EACH 6.00 900.00 1 1,076.00
2 1,200.00
3 1,200.00
4 1,130.00
5 1,020.00
467-6388 SET (TY II) (24 IN) (RCP) (3: 1) (C)
467-6390 SET (TY II) (24 IN) (RCP) (4: 1) (C)
467-6392 SET (TY II) (24 IN) (RCP) (5: 1) (C)
467-6358 SET (TY II) (18 IN) (RCP) (4: 1) (C)
467-6359 SET (TY II) (18 IN) (RCP) (4: 1) (P)
467-6360 SET (TY II) (18 IN) (RCP) (5: 1) (C)
467-6362 SET (TY II) (18 IN) (RCP) (6: 1) (C)
467-6363 SET (TY II) (18 IN) (RCP) (6: 1) (P)
Date Prepared: 11/10/2017 Page: 21 of 61
County: Let Date:
Type: Bid No:
Time: Project ID:
Highway: Contract #:
Length: CCSJ:
From: To:
Estimate $ 168,951,004.96
Bidder 1 $ 202,548,591.57
Bidder 2 $ 233,445,739.29
Bidder 3 $ 252,286,943.96
Bidder 4 $ 279,428,828.61
Bidder 5 $ 289,374,971.13
Item CodeUnit Quantity Unit Est. Bidder Unit Bid
Exibit 2. Tabulation of Bids for HCRMA BID #2017-002 for the 365 Toll Project
Contract No. 0921-02-368
11/10/2017
HCRMA #2017-002365 TOLL (SEGS. 1 & 2)
0921-02-368
0921-02-368
71%
Description
Johnson Bros Corp., a Southland Company
Anderson Columbia Company, Inc.
Pulice
Webber, LLC
% Over/Under
20%
38%
49%
Company
1264 CALENDAR DAYS
HIDALGO
0.07 mi north of US 281 (Military Highway)
Lane-Abrams Toll 365 Joint Venture
CONTROLLED ACCESS TOLL FACILITY
0.58 mi west of FM 396 (Anzalduas Hwy)
12.22
365TOLL
65%
EACH 6.00 900.00 1 1,076.00
2 1,200.00
3 1,200.00
4 1,130.00
5 1,020.00
EACH 4.00 2,000.00 1 1,615.00
2 1,600.00
3 1,400.00
4 1,320.00
5 1,520.00
EACH 1.00 3,500.00 1 1,615.00
2 1,700.00
3 1,500.00
4 1,500.00
5 1,520.00
EACH 4.00 2,500.00 1 1,615.00
2 1,500.00
3 1,700.00
4 1,490.00
5 1,520.00
EACH 2.00 2,700.00 1 1,615.00
2 1,500.00
3 2,500.00
4 1,490.00
5 1,520.00
EACH 1.00 4,500.00 1 2,700.00
2 3,000.00
3 2,500.00
4 2,900.00
5 2,540.00
LINEAR FOOT 33.00 70.00 1 338.00
2 250.00
3 70.00
4 162.00
5 254.00
LINEAR FOOT 237.00 600.00 1 415.00
2 350.00
3 600.00
4 390.00
5 391.00
476-6015 JACK BOR OR TUN PIPE(24 IN)(RC)(CL V)
467-6422 SET (TY II) (30 IN) (RCP) (6: 1) (C)
467-6439 SET (TY II) (36 IN) (CMP) (3: 1) (C)
467-6450 SET (TY II) (36 IN) (RCP) (4: 1) (C)
467-6465 SET (TY II) (42 IN) (RCP) (6: 1) (C)
472-6015 REMOV & RE - LAY PIPE (60 IN)
467-6394 SET (TY II) (24 IN) (RCP) (6: 1) (C)
467-6417 SET (TY II) (30 IN) (RCP) (3: 1) (C)
Date Prepared: 11/10/2017 Page: 22 of 61
County: Let Date:
Type: Bid No:
Time: Project ID:
Highway: Contract #:
Length: CCSJ:
From: To:
Estimate $ 168,951,004.96
Bidder 1 $ 202,548,591.57
Bidder 2 $ 233,445,739.29
Bidder 3 $ 252,286,943.96
Bidder 4 $ 279,428,828.61
Bidder 5 $ 289,374,971.13
Item CodeUnit Quantity Unit Est. Bidder Unit Bid
Exibit 2. Tabulation of Bids for HCRMA BID #2017-002 for the 365 Toll Project
Contract No. 0921-02-368
11/10/2017
HCRMA #2017-002365 TOLL (SEGS. 1 & 2)
0921-02-368
0921-02-368
71%
Description
Johnson Bros Corp., a Southland Company
Anderson Columbia Company, Inc.
Pulice
Webber, LLC
% Over/Under
20%
38%
49%
Company
1264 CALENDAR DAYS
HIDALGO
0.07 mi north of US 281 (Military Highway)
Lane-Abrams Toll 365 Joint Venture
CONTROLLED ACCESS TOLL FACILITY
0.58 mi west of FM 396 (Anzalduas Hwy)
12.22
365TOLL
65%
LINEAR FOOT 100.00 600.00 1 410.00
2 400.00
3 510.00
4 430.00
5 386.00
LINEAR FOOT 533.00 650.00 1 512.00
2 500.00
3 700.00
4 540.00
5 482.00
LINEAR FOOT 100.00 1,300.00 1 1,510.00
2 1,500.00
3 1,600.00
4 1,750.00
5 1,420.00
EACH 1.00 1,500.00 1 5,920.00
2 1,500.00
3 700.00
4 1,960.00
5 5,580.00
EACH 50.00 120.00 1 270.00
2 250.00
3 350.00
4 440.00
5 254.00
EACH 1.00 4,000.00 1 2,200.00
2 1,000.00
3 700.00
4 2,100.00
5 1,860.00
EACH 10.00 1,200.00 1 2,200.00
2 3,500.00
3 550.00
4 1,210.00
5 2,030.00
LINEAR FOOT 9,413.00 8.00 1 9.00
2 8.00
3 16.50
4 8.80
5 7.90
496-6004 REMOV STR (SET)
496-6005 REMOV STR (WINGWALL)
496-6006 REMOV STR (HEADWALL)
496-6007 REMOV STR (PIPE)
476-6017 JACK BOR OR TUN PIPE(24 IN)(STL
CASING)
476-6021 JACK BOR OR TUN PIPE(30 IN)(RC)(CL V)
476-6054 JACK BOR OR TUN PIPE(72 IN)(RC)(CL IV)
479-6001 ADJUSTING MANHOLES
Date Prepared: 11/10/2017 Page: 23 of 61
County: Let Date:
Type: Bid No:
Time: Project ID:
Highway: Contract #:
Length: CCSJ:
From: To:
Estimate $ 168,951,004.96
Bidder 1 $ 202,548,591.57
Bidder 2 $ 233,445,739.29
Bidder 3 $ 252,286,943.96
Bidder 4 $ 279,428,828.61
Bidder 5 $ 289,374,971.13
Item CodeUnit Quantity Unit Est. Bidder Unit Bid
Exibit 2. Tabulation of Bids for HCRMA BID #2017-002 for the 365 Toll Project
Contract No. 0921-02-368
11/10/2017
HCRMA #2017-002365 TOLL (SEGS. 1 & 2)
0921-02-368
0921-02-368
71%
Description
Johnson Bros Corp., a Southland Company
Anderson Columbia Company, Inc.
Pulice
Webber, LLC
% Over/Under
20%
38%
49%
Company
1264 CALENDAR DAYS
HIDALGO
0.07 mi north of US 281 (Military Highway)
Lane-Abrams Toll 365 Joint Venture
CONTROLLED ACCESS TOLL FACILITY
0.58 mi west of FM 396 (Anzalduas Hwy)
12.22
365TOLL
65%
LINEAR FOOT 252.00 38.00 1 22.00
2 50.00
3 130.00
4 169.00
5 20.30
EACH 1.00 15,000.00 1 27,000.00
2 25,000.00
3 15,000.00
4 13,000.00
5 25,380.00
EACH 8.00 1,000.00 1 430.00
2 1,500.00
3 12.00
4 820.00
5 406.00
EACH 1.00 10,000.00 1 2,700.00
2 6,500.00
3 2,500.00
4 8,600.00
5 2,540.00
EACH 10.00 500.00 1 1,100.00
2 1,000.00
3 250.00
4 1,190.00
5 1,020.00
LINEAR FOOT 8,271.00 5.00 1 3.00
2 2.00
3 3.00
4 1.70
5 2.55
EACH 9.00 500.00 1 1,100.00
2 2,000.00
3 450.00
4 4,400.00
5 1,020.00
CUBIC YARD 30.00 80.00 1 100.00
2 120.00
3 37.00
4 68.00
5 152.00
496-6096 REMOV STR (WELL GATE)
496-9001 REMOVE (ROCK RIPRAP)
496-6009 REMOV STR (BRIDGE 0 - 99 FT LENGTH)
496-6016 REMOV STR (PIPE)
496-6041 REMOV STR (LARGE)
496-6042 REMOV STR (SMALL)
496-6043 REMOV STR (SMALL FENCE)
496-6008 REMOV STR (BOX CULVERT)
Date Prepared: 11/10/2017 Page: 24 of 61
County: Let Date:
Type: Bid No:
Time: Project ID:
Highway: Contract #:
Length: CCSJ:
From: To:
Estimate $ 168,951,004.96
Bidder 1 $ 202,548,591.57
Bidder 2 $ 233,445,739.29
Bidder 3 $ 252,286,943.96
Bidder 4 $ 279,428,828.61
Bidder 5 $ 289,374,971.13
Item CodeUnit Quantity Unit Est. Bidder Unit Bid
Exibit 2. Tabulation of Bids for HCRMA BID #2017-002 for the 365 Toll Project
Contract No. 0921-02-368
11/10/2017
HCRMA #2017-002365 TOLL (SEGS. 1 & 2)
0921-02-368
0921-02-368
71%
Description
Johnson Bros Corp., a Southland Company
Anderson Columbia Company, Inc.
Pulice
Webber, LLC
% Over/Under
20%
38%
49%
Company
1264 CALENDAR DAYS
HIDALGO
0.07 mi north of US 281 (Military Highway)
Lane-Abrams Toll 365 Joint Venture
CONTROLLED ACCESS TOLL FACILITY
0.58 mi west of FM 396 (Anzalduas Hwy)
12.22
365TOLL
65%
LUMP SUM 1.00 4,000,000.00 1 18,895,400.00
2 17,450,000.00
3 25,000,000.00
4 27,500,000.00
5 29,000,000.00
MONTH 42.00 2,500.00 1 7,500.00
2 5,000.00
3 5,000.00
4 27,000.00
5 60,000.00
LINEAR FOOT 523.00 25.00 1 26.50
2 40.00
3 35.00
4 27.00
5 26.00
LINEAR FOOT 523.00 10.00 1 14.00
2 10.00
3 2.00
4 15.00
5 14.40
SQUARE YARD 3,120.00 10.00 1 21.00
2 25.00
3 21.00
4 18.00
5 17.60
SQUARE YARD 3,120.00 4.00 1 11.00
2 10.00
3 11.00
4 9.50
5 9.30
HOUR 61.00 55.00 1 90.00
2 120.00
3 75.00
4 92.00
5 113.00
LINEAR FOOT 39,560.00 1.50 1 2.25
2 2.40
3 2.50
4 1.90
5 1.85
506-6011 ROCK FILTER DAMS (REMOVE)
506-6020 CONSTRUCTION EXITS (INSTALL) (TY 1)
506-6024 CONSTRUCTION EXITS (REMOVE)
506-6031 FRNT END LOADER WORK (ERSN & SEDM
CONT)
506-6038 TEMP SEDMT CONT FENCE (INSTALL)
500-6001 MOBILIZATION
502-6001 BARRICADES, SIGNS AND TRAFFIC
HANDLING
506-6002 ROCK FILTER DAMS (INSTALL) (TY 2)
Date Prepared: 11/10/2017 Page: 25 of 61
County: Let Date:
Type: Bid No:
Time: Project ID:
Highway: Contract #:
Length: CCSJ:
From: To:
Estimate $ 168,951,004.96
Bidder 1 $ 202,548,591.57
Bidder 2 $ 233,445,739.29
Bidder 3 $ 252,286,943.96
Bidder 4 $ 279,428,828.61
Bidder 5 $ 289,374,971.13
Item CodeUnit Quantity Unit Est. Bidder Unit Bid
Exibit 2. Tabulation of Bids for HCRMA BID #2017-002 for the 365 Toll Project
Contract No. 0921-02-368
11/10/2017
HCRMA #2017-002365 TOLL (SEGS. 1 & 2)
0921-02-368
0921-02-368
71%
Description
Johnson Bros Corp., a Southland Company
Anderson Columbia Company, Inc.
Pulice
Webber, LLC
% Over/Under
20%
38%
49%
Company
1264 CALENDAR DAYS
HIDALGO
0.07 mi north of US 281 (Military Highway)
Lane-Abrams Toll 365 Joint Venture
CONTROLLED ACCESS TOLL FACILITY
0.58 mi west of FM 396 (Anzalduas Hwy)
12.22
365TOLL
65%
LINEAR FOOT 39,560.00 0.50 1 1.00
2 0.40
3 0.15
4 0.50
5 0.50
LINEAR FOOT 28,752.00 2.00 1 4.00
2 3.00
3 2.50
4 2.45
5 2.40
LINEAR FOOT 28,752.00 0.70 1 0.75
2 0.50
3 0.15
4 0.50
5 0.50
SQUARE YARD 4,138.00 50.00 1 16.00
2 40.00
3 25.00
4 41.00
5 89.75
LINEAR FOOT 334.00 50.00 1 63.00
2 80.00
3 75.00
4 69.00
5 61.50
LINEAR FOOT 64.00 15.00 1 52.00
2 40.00
3 15.00
4 21.00
5 44.75
LINEAR FOOT 3,458.00 62.00 1 40.00
2 90.00
3 70.00
4 59.00
5 87.25
LINEAR FOOT 10.00 200.00 1 125.00
2 90.00
3 325.00
4 126.00
5 154.00
512-6049 PORT CTB (REMOVE)(SGL SLP)(TY 1)
514-6001 PERM CTB (SGL SLOPE) (TY 1) (42 )
514-6004 PERM CTB (SGL SLOPE) (TY 4) (42 )
506-6039 TEMP SEDMT CONT FENCE (REMOVE)
506-6041 BIODEG EROSN CONT LOGS (INSTL) (12")
506-6043 BIODEG EROSN CONT LOGS (REMOVE)
508-6001 CONSTRUCTING DETOURS
512-6001 PORT CTB (FUR & INST)(SGL SLOPE)(TY 1)
Date Prepared: 11/10/2017 Page: 26 of 61
County: Let Date:
Type: Bid No:
Time: Project ID:
Highway: Contract #:
Length: CCSJ:
From: To:
Estimate $ 168,951,004.96
Bidder 1 $ 202,548,591.57
Bidder 2 $ 233,445,739.29
Bidder 3 $ 252,286,943.96
Bidder 4 $ 279,428,828.61
Bidder 5 $ 289,374,971.13
Item CodeUnit Quantity Unit Est. Bidder Unit Bid
Exibit 2. Tabulation of Bids for HCRMA BID #2017-002 for the 365 Toll Project
Contract No. 0921-02-368
11/10/2017
HCRMA #2017-002365 TOLL (SEGS. 1 & 2)
0921-02-368
0921-02-368
71%
Description
Johnson Bros Corp., a Southland Company
Anderson Columbia Company, Inc.
Pulice
Webber, LLC
% Over/Under
20%
38%
49%
Company
1264 CALENDAR DAYS
HIDALGO
0.07 mi north of US 281 (Military Highway)
Lane-Abrams Toll 365 Joint Venture
CONTROLLED ACCESS TOLL FACILITY
0.58 mi west of FM 396 (Anzalduas Hwy)
12.22
365TOLL
65%
LINEAR FOOT 10,082.00 60.00 1 40.00
2 90.00
3 75.00
4 62.00
5 102.00
SQUARE YARD 12,727.00 45.00 1 32.00
2 56.00
3 50.00
4 45.00
5 55.75
LINEAR FOOT 2,084.00 10.00 1 15.00
2 14.00
3 10.00
4 12.00
5 0.55
LINEAR FOOT 613.00 20.00 1 17.00
2 14.00
3 5.00
4 2.60
5 0.55
LINEAR FOOT 5,026.00 8.00 1 14.00
2 14.00
3 9.00
4 12.00
5 9.00
LINEAR FOOT 8,121.00 20.00 1 12.00
2 16.00
3 12.00
4 15.00
5 11.50
LINEAR FOOT 640.00 26.00 1 17.00
2 16.00
3 16.00
4 46.00
5 15.00
LINEAR FOOT 19,219.00 20.00 1 30.00
2 40.00
3 21.00
4 20.00
5 19.00
529-6031 CONC CURB & GUTTER(VALLEY
GUTTER)(48")
529-6002 CONC CURB (TY II)
529-6006 CONC CURB (MONO) (TY II A)
529-6024 CONC CURB (MOUNTABLE)
529-6028 CONC CURB & GUTTER (TY B)
(MOUNTABLE)
529-6030 CONC CURB & GUTTER (VALLEY GUTTER)
514-6005 PERM CTB (SGL SLOPE) (TY 1) (48 )
528-6004 LANDSCAPE PAVERS
Date Prepared: 11/10/2017 Page: 27 of 61
County: Let Date:
Type: Bid No:
Time: Project ID:
Highway: Contract #:
Length: CCSJ:
From: To:
Estimate $ 168,951,004.96
Bidder 1 $ 202,548,591.57
Bidder 2 $ 233,445,739.29
Bidder 3 $ 252,286,943.96
Bidder 4 $ 279,428,828.61
Bidder 5 $ 289,374,971.13
Item CodeUnit Quantity Unit Est. Bidder Unit Bid
Exibit 2. Tabulation of Bids for HCRMA BID #2017-002 for the 365 Toll Project
Contract No. 0921-02-368
11/10/2017
HCRMA #2017-002365 TOLL (SEGS. 1 & 2)
0921-02-368
0921-02-368
71%
Description
Johnson Bros Corp., a Southland Company
Anderson Columbia Company, Inc.
Pulice
Webber, LLC
% Over/Under
20%
38%
49%
Company
1264 CALENDAR DAYS
HIDALGO
0.07 mi north of US 281 (Military Highway)
Lane-Abrams Toll 365 Joint Venture
CONTROLLED ACCESS TOLL FACILITY
0.58 mi west of FM 396 (Anzalduas Hwy)
12.22
365TOLL
65%
SQUARE YARD 372.00 100.00 1 64.00
2 60.00
3 45.00
4 83.00
5 18.00
SQUARE YARD 7,236.00 16.00 1 32.00
2 24.00
3 20.00
4 34.00
5 18.00
SQUARE YARD 341.00 70.00 1 50.00
2 44.00
3 40.00
4 68.00
5 35.00
EACH 8.00 1,500.00 1 1,712.00
2 1,200.00
3 1,400.00
4 1,090.00
5 1,200.00
EACH 1.00 1,000.00 1 1,425.00
2 1,200.00
3 1,400.00
4 1,090.00
5 1,000.00
EACH 3.00 1,500.00 1 1,712.00
2 1,200.00
3 1,400.00
4 1,090.00
5 1,200.00
EACH 26.00 1,300.00 1 1,712.00
2 1,200.00
3 1,400.00
4 1,140.00
5 1,200.00
EACH 2.00 500.00 1 500.00
2 500.00
3 2,000.00
4 360.00
5 500.00
531-6008 CURB RAMPS (TY 5)
531-6010 CURB RAMPS (TY 7)
531-6015 CURB RAMPS (TY 20)
538-6001 RIGHT OF WAY MARKERS
530-6002 INTERSECTIONS (ACP)
530-6005 DRIVEWAYS (ACP)
531-6001 CONC SIDEWALKS (4")
531-6004 CURB RAMPS (TY 1)
Date Prepared: 11/10/2017 Page: 28 of 61
County: Let Date:
Type: Bid No:
Time: Project ID:
Highway: Contract #:
Length: CCSJ:
From: To:
Estimate $ 168,951,004.96
Bidder 1 $ 202,548,591.57
Bidder 2 $ 233,445,739.29
Bidder 3 $ 252,286,943.96
Bidder 4 $ 279,428,828.61
Bidder 5 $ 289,374,971.13
Item CodeUnit Quantity Unit Est. Bidder Unit Bid
Exibit 2. Tabulation of Bids for HCRMA BID #2017-002 for the 365 Toll Project
Contract No. 0921-02-368
11/10/2017
HCRMA #2017-002365 TOLL (SEGS. 1 & 2)
0921-02-368
0921-02-368
71%
Description
Johnson Bros Corp., a Southland Company
Anderson Columbia Company, Inc.
Pulice
Webber, LLC
% Over/Under
20%
38%
49%
Company
1264 CALENDAR DAYS
HIDALGO
0.07 mi north of US 281 (Military Highway)
Lane-Abrams Toll 365 Joint Venture
CONTROLLED ACCESS TOLL FACILITY
0.58 mi west of FM 396 (Anzalduas Hwy)
12.22
365TOLL
65%
LINEAR FOOT 45,614.00 19.00 1 10.00
2 21.00
3 15.00
4 22.00
5 20.00
EACH 96.00 1,100.00 1 752.00
2 1,500.00
3 1,700.00
4 2,100.00
5 1,300.00
LINEAR FOOT 1,295.00 25.00 1 14.00
2 22.00
3 33.00
4 31.00
5 21.00
EACH 91.00 825.00 1 554.00
2 1,200.00
3 1,000.00
4 1,040.00
5 1,000.00
LINEAR FOOT 2,988.00 1.00 1 2.50
2 2.50
3 2.75
4 1.40
5 1.60
LINEAR FOOT 46,203.00 8.00 1 7.00
2 14.00
3 13.00
4 10.50
5 13.20
EACH 30.00 2,200.00 1 1,850.00
2 2,500.00
3 2,300.00
4 2,200.00
5 2,300.00
EACH 108.00 2,000.00 1 1,330.00
2 2,200.00
3 2,300.00
4 2,400.00
5 2,200.00
543-6020 CABLE BARRIER TERMINAL SECTION (TL-
4)
544-6001 GUARDRAIL END TREATMENT (INSTALL)
540-6006 MTL BEAM GD FEN TRANS (THRIE-BEAM)
540-6014 SHORT RADIUS
540-6016 DOWNSTREAM ANCHOR TERMINAL
SECTION
542-6001 REMOVE METAL BEAM GUARD FENCE
543-6006 CABLE BARRIER SYSTEM (TL-4) (10'-0")
540-6001 MTL W-BEAM GD FEN (TIM POST)
Date Prepared: 11/10/2017 Page: 29 of 61
County: Let Date:
Type: Bid No:
Time: Project ID:
Highway: Contract #:
Length: CCSJ:
From: To:
Estimate $ 168,951,004.96
Bidder 1 $ 202,548,591.57
Bidder 2 $ 233,445,739.29
Bidder 3 $ 252,286,943.96
Bidder 4 $ 279,428,828.61
Bidder 5 $ 289,374,971.13
Item CodeUnit Quantity Unit Est. Bidder Unit Bid
Exibit 2. Tabulation of Bids for HCRMA BID #2017-002 for the 365 Toll Project
Contract No. 0921-02-368
11/10/2017
HCRMA #2017-002365 TOLL (SEGS. 1 & 2)
0921-02-368
0921-02-368
71%
Description
Johnson Bros Corp., a Southland Company
Anderson Columbia Company, Inc.
Pulice
Webber, LLC
% Over/Under
20%
38%
49%
Company
1264 CALENDAR DAYS
HIDALGO
0.07 mi north of US 281 (Military Highway)
Lane-Abrams Toll 365 Joint Venture
CONTROLLED ACCESS TOLL FACILITY
0.58 mi west of FM 396 (Anzalduas Hwy)
12.22
365TOLL
65%
EACH 9.00 13,500.00 1 14,000.00
2 32,200.00
3 11,000.00
4 13,600.00
5 31,600.00
LINEAR FOOT 65.00 150.00 1 25.00
2 26.00
3 33.00
4 30.00
5 15.00
LINEAR FOOT 1,562.00 3.00 1 3.00
2 3.00
3 8.00
4 2.80
5 1.50
EACH 1.00 1,000.00 1 650.00
2 710.00
3 500.00
4 700.00
5 600.00
LINEAR FOOT 21,120.00 12.00 1 24.00
2 19.00
3 35.00
4 17.50
5 1.00
EACH 3.00 200.00 1 400.00
2 180.00
3 200.00
4 158.00
5 368.00
EACH 1.00 300.00 1 500.00
2 410.00
3 300.00
4 160.00
5 1,320.00
EACH 32.00 1,500.00 1 1,385.00
2 1,400.00
3 1,300.00
4 1,100.00
5 1,650.00
550-6006 GATE (REMOVE)
556-6007 PIPE UNDERDRAINS (TY 7) (6")
560-6007 MAILBOX INSTALL-S (WC-POST) TY 3
560-9001 MAILBOX INSTALL-M (WC-POST) TY 3
610-6104 IN RD IL (U/P) (TY 1) (150W EQ) LED
545-6001 CRASH CUSH ATTEN (INSTL)
550-6001 CHAIN LINK FENCE (INSTALL) (6')
550-6003 CHAIN LINK FENCE (REMOVE)
Date Prepared: 11/10/2017 Page: 30 of 61
County: Let Date:
Type: Bid No:
Time: Project ID:
Highway: Contract #:
Length: CCSJ:
From: To:
Estimate $ 168,951,004.96
Bidder 1 $ 202,548,591.57
Bidder 2 $ 233,445,739.29
Bidder 3 $ 252,286,943.96
Bidder 4 $ 279,428,828.61
Bidder 5 $ 289,374,971.13
Item CodeUnit Quantity Unit Est. Bidder Unit Bid
Exibit 2. Tabulation of Bids for HCRMA BID #2017-002 for the 365 Toll Project
Contract No. 0921-02-368
11/10/2017
HCRMA #2017-002365 TOLL (SEGS. 1 & 2)
0921-02-368
0921-02-368
71%
Description
Johnson Bros Corp., a Southland Company
Anderson Columbia Company, Inc.
Pulice
Webber, LLC
% Over/Under
20%
38%
49%
Company
1264 CALENDAR DAYS
HIDALGO
0.07 mi north of US 281 (Military Highway)
Lane-Abrams Toll 365 Joint Venture
CONTROLLED ACCESS TOLL FACILITY
0.58 mi west of FM 396 (Anzalduas Hwy)
12.22
365TOLL
65%
EACH 76.00 1,200.00 1 1,430.00
2 1,440.00
3 1,300.00
4 1,290.00
5 1,850.00
EACH 3.00 2,000.00 1 3,000.00
2 3,000.00
3 2,800.00
4 1,350.00
5 2,870.00
EACH 26.00 2,800.00 1 3,100.00
2 3,100.00
3 2,900.00
4 2,600.00
5 2,150.00
EACH 81.00 2,800.00 1 3,300.00
2 3,300.00
3 3,000.00
4 3,100.00
5 2,670.00
EACH 42.00 2,000.00 1 3,200.00
2 3,200.00
3 2,900.00
4 2,100.00
5 2,250.00
EACH 11.00 3,200.00 1 3,400.00
2 3,400.00
3 3,200.00
4 2,300.00
5 2,750.00
EACH 4.00 3,800.00 1 3,700.00
2 3,700.00
3 3,400.00
4 3,900.00
5 3,350.00
EACH 4.00 4,000.00 1 3,650.00
2 3,600.00
3 3,300.00
4 3,700.00
5 3,500.00
610-6259 IN RD IL (TY ST) 40T-12-12(250W EQ)LED
610-6261 IN RD IL (TY SP) 48S-4-4 (400W EQ) LED
610-6282 IN RD IL (TY SA) 50S-12 (400W EQ) LED
610-6106 IN RD IL (U/P) (TY 2) (150W EQ) LED
610-6188 IN RD IL (TY SP) 38S-4 (250W EQ) LED
610-6214 IN RD IL (TY SA) 40T-8 (250W EQ) LED
610-6215 IN RD IL (TY SA) 40T-8-8 (250W EQ) LED
610-6218 IN RD IL (TY SA) 40T-12 (250W EQ) LED
Date Prepared: 11/10/2017 Page: 31 of 61
County: Let Date:
Type: Bid No:
Time: Project ID:
Highway: Contract #:
Length: CCSJ:
From: To:
Estimate $ 168,951,004.96
Bidder 1 $ 202,548,591.57
Bidder 2 $ 233,445,739.29
Bidder 3 $ 252,286,943.96
Bidder 4 $ 279,428,828.61
Bidder 5 $ 289,374,971.13
Item CodeUnit Quantity Unit Est. Bidder Unit Bid
Exibit 2. Tabulation of Bids for HCRMA BID #2017-002 for the 365 Toll Project
Contract No. 0921-02-368
11/10/2017
HCRMA #2017-002365 TOLL (SEGS. 1 & 2)
0921-02-368
0921-02-368
71%
Description
Johnson Bros Corp., a Southland Company
Anderson Columbia Company, Inc.
Pulice
Webber, LLC
% Over/Under
20%
38%
49%
Company
1264 CALENDAR DAYS
HIDALGO
0.07 mi north of US 281 (Military Highway)
Lane-Abrams Toll 365 Joint Venture
CONTROLLED ACCESS TOLL FACILITY
0.58 mi west of FM 396 (Anzalduas Hwy)
12.22
365TOLL
65%
EACH 26.00 2,600.00 1 3,700.00
2 3,700.00
3 3,400.00
4 3,800.00
5 2,850.00
EACH 10.00 32,000.00 1 38,500.00
2 38,800.00
3 35,000.00
4 30,000.00
5 38,500.00
EACH 5.00 32,000.00 1 24,750.00
2 24,900.00
3 23,000.00
4 32,000.00
5 30,500.00
EACH 5.00 32,000.00 1 24,500.00
2 24,800.00
3 23,000.00
4 31,000.00
5 30,500.00
LINEAR FOOT 3,298.00 9.75 1 3.60
2 3.60
3 3.30
4 9.70
5 7.00
LINEAR FOOT 49,972.00 6.00 1 3.80
2 3.80
3 3.50
4 6.40
5 4.00
LINEAR FOOT 4,563.00 36.00 1 28.00
2 27.00
3 25.00
4 30.00
5 18.00
LINEAR FOOT 707.00 40.00 1 9.00
2 9.00
3 8.00
4 14.00
5 10.00
618-6029 CONDT (PVC) (SCH 40) (3")
614-6002 HI MST IL ASM (12-400W)(ASYM)(TY B)
614-6003 HI MST IL ASM (12-400W)(SYM)
618-6016 CONDT (PVC) (SCH 40) (1")
618-6023 CONDT (PVC) (SCH 40) (2")
618-6024 CONDT (PVC) (SCH 40) (2") (BORE)
610-6290 IN RD IL (TY SA) 50T-12 (400W EQ) LED
613-6006 HI MST IL POLE (150 FT)(100 MPH)
Date Prepared: 11/10/2017 Page: 32 of 61
County: Let Date:
Type: Bid No:
Time: Project ID:
Highway: Contract #:
Length: CCSJ:
From: To:
Estimate $ 168,951,004.96
Bidder 1 $ 202,548,591.57
Bidder 2 $ 233,445,739.29
Bidder 3 $ 252,286,943.96
Bidder 4 $ 279,428,828.61
Bidder 5 $ 289,374,971.13
Item CodeUnit Quantity Unit Est. Bidder Unit Bid
Exibit 2. Tabulation of Bids for HCRMA BID #2017-002 for the 365 Toll Project
Contract No. 0921-02-368
11/10/2017
HCRMA #2017-002365 TOLL (SEGS. 1 & 2)
0921-02-368
0921-02-368
71%
Description
Johnson Bros Corp., a Southland Company
Anderson Columbia Company, Inc.
Pulice
Webber, LLC
% Over/Under
20%
38%
49%
Company
1264 CALENDAR DAYS
HIDALGO
0.07 mi north of US 281 (Military Highway)
Lane-Abrams Toll 365 Joint Venture
CONTROLLED ACCESS TOLL FACILITY
0.58 mi west of FM 396 (Anzalduas Hwy)
12.22
365TOLL
65%
LINEAR FOOT 320.00 50.00 1 37.00
2 37.00
3 34.00
4 28.00
5 27.00
LINEAR FOOT 1,393.00 12.00 1 9.00
2 9.40
3 8.50
4 12.00
5 15.00
LINEAR FOOT 1,591.00 30.00 1 46.00
2 46.00
3 43.00
4 24.00
5 30.00
LINEAR FOOT 6,655.00 12.00 1 4.00
2 3.80
3 3.50
4 10.00
5 4.00
LINEAR FOOT 2,545.00 16.00 1 28.00
2 28.00
3 25.00
4 45.00
5 20.00
LINEAR FOOT 5,661.00 25.00 1 9.00
2 9.00
3 8.30
4 28.00
5 15.00
LINEAR FOOT 6,800.00 35.00 1 45.00
2 45.00
3 42.00
4 35.00
5 65.00
LINEAR FOOT 155,515.00 0.75 1 0.55
2 0.54
3 0.50
4 2.00
5 0.45
618-6047 CONDT (PVC) (SCH 80) (2") (BORE)
618-6064 CONDT (RM) (1")
618-6074 CONDT (RM) (3")
620-6002 ELEC CONDR (NO.14) INSULATED
618-6030 CONDT (PVC) (SCH 40) (3") (BORE)
618-6033 CONDT (PVC) (SCH 40) (4")
618-6034 CONDT (PVC) (SCH 40) (4") (BORE)
618-6046 CONDT (PVC) (SCH 80) (2")
Date Prepared: 11/10/2017 Page: 33 of 61
County: Let Date:
Type: Bid No:
Time: Project ID:
Highway: Contract #:
Length: CCSJ:
From: To:
Estimate $ 168,951,004.96
Bidder 1 $ 202,548,591.57
Bidder 2 $ 233,445,739.29
Bidder 3 $ 252,286,943.96
Bidder 4 $ 279,428,828.61
Bidder 5 $ 289,374,971.13
Item CodeUnit Quantity Unit Est. Bidder Unit Bid
Exibit 2. Tabulation of Bids for HCRMA BID #2017-002 for the 365 Toll Project
Contract No. 0921-02-368
11/10/2017
HCRMA #2017-002365 TOLL (SEGS. 1 & 2)
0921-02-368
0921-02-368
71%
Description
Johnson Bros Corp., a Southland Company
Anderson Columbia Company, Inc.
Pulice
Webber, LLC
% Over/Under
20%
38%
49%
Company
1264 CALENDAR DAYS
HIDALGO
0.07 mi north of US 281 (Military Highway)
Lane-Abrams Toll 365 Joint Venture
CONTROLLED ACCESS TOLL FACILITY
0.58 mi west of FM 396 (Anzalduas Hwy)
12.22
365TOLL
65%
LINEAR FOOT 3,509.00 0.90 1 0.55
2 0.55
3 0.50
4 1.10
5 0.50
LINEAR FOOT 7,018.00 1.10 1 0.58
2 0.60
3 0.50
4 1.80
5 0.55
LINEAR FOOT 48,044.00 1.00 1 0.70
2 0.70
3 0.60
4 1.00
5 0.85
LINEAR FOOT 260,663.00 1.00 1 0.80
2 0.80
3 0.70
4 1.05
5 0.90
LINEAR FOOT 13,884.00 1.20 1 0.85
2 0.85
3 0.75
4 1.25
5 1.00
LINEAR FOOT 28,088.00 1.20 1 1.00
2 1.00
3 0.80
4 1.40
5 1.10
LINEAR FOOT 6,691.00 1.75 1 1.00
2 1.10
3 1.00
4 1.55
5 1.70
LINEAR FOOT 13,412.00 1.75 1 1.20
2 1.20
3 1.00
4 1.70
5 1.80
620-6009 ELEC CONDR (NO.6) BARE
620-6010 ELEC CONDR (NO.6) INSULATED
620-6011 ELEC CONDR (NO.4) BARE
620-6012 ELEC CONDR (NO.4) INSULATED
620-6004 ELEC CONDR (NO.12) INSULATED
620-6007 ELEC CONDR (NO.8) BARE
620-6008 ELEC CONDR (NO.8) INSULATED
620-6003 ELEC CONDR (NO.12) BARE
Date Prepared: 11/10/2017 Page: 34 of 61
County: Let Date:
Type: Bid No:
Time: Project ID:
Highway: Contract #:
Length: CCSJ:
From: To:
Estimate $ 168,951,004.96
Bidder 1 $ 202,548,591.57
Bidder 2 $ 233,445,739.29
Bidder 3 $ 252,286,943.96
Bidder 4 $ 279,428,828.61
Bidder 5 $ 289,374,971.13
Item CodeUnit Quantity Unit Est. Bidder Unit Bid
Exibit 2. Tabulation of Bids for HCRMA BID #2017-002 for the 365 Toll Project
Contract No. 0921-02-368
11/10/2017
HCRMA #2017-002365 TOLL (SEGS. 1 & 2)
0921-02-368
0921-02-368
71%
Description
Johnson Bros Corp., a Southland Company
Anderson Columbia Company, Inc.
Pulice
Webber, LLC
% Over/Under
20%
38%
49%
Company
1264 CALENDAR DAYS
HIDALGO
0.07 mi north of US 281 (Military Highway)
Lane-Abrams Toll 365 Joint Venture
CONTROLLED ACCESS TOLL FACILITY
0.58 mi west of FM 396 (Anzalduas Hwy)
12.22
365TOLL
65%
LINEAR FOOT 3,045.00 1.80 1 1.20
2 1.20
3 1.15
4 2.90
5 2.00
LINEAR FOOT 6,090.00 1.80 1 1.40
2 1.40
3 1.30
4 3.00
5 2.20
LINEAR FOOT 2,761.00 1.90 1 1.45
2 1.40
3 1.30
4 2.00
5 16.00
LINEAR FOOT 1,899.00 3.25 1 2.50
2 2.40
3 2.25
4 4.30
5 2.60
EACH 342.00 700.00 1 755.00
2 760.00
3 700.00
4 700.00
5 950.00
EACH 55.00 690.00 1 940.00
2 940.00
3 875.00
4 700.00
5 1,100.00
LINEAR FOOT 700.00 3.00 1 1.50
2 1.55
3 1.40
4 2.30
5 2.00
LINEAR FOOT 1,980.00 3.25 1 1.65
2 1.65
3 1.50
4 3.10
5 2.50
GROUND BOX TY D (162922)W/APRON
625-6002 ZINC-COAT STL WIRE STRAND (3/16")
625-6004 ZINC-COAT STL WIRE STRAND (5/16")
620-6013 ELEC CONDR (NO.3) BARE
620-6014 ELEC CONDR (NO.3) INSULATED
621-6005 TRAY CABLE (4 CONDR) (12 AWG)
621-6007 TRAY CABLE (4 CONDR) (8 AWG)
624-6002 GROUND BOX TY A (122311)W/APRON
624-6010
Date Prepared: 11/10/2017 Page: 35 of 61
County: Let Date:
Type: Bid No:
Time: Project ID:
Highway: Contract #:
Length: CCSJ:
From: To:
Estimate $ 168,951,004.96
Bidder 1 $ 202,548,591.57
Bidder 2 $ 233,445,739.29
Bidder 3 $ 252,286,943.96
Bidder 4 $ 279,428,828.61
Bidder 5 $ 289,374,971.13
Item CodeUnit Quantity Unit Est. Bidder Unit Bid
Exibit 2. Tabulation of Bids for HCRMA BID #2017-002 for the 365 Toll Project
Contract No. 0921-02-368
11/10/2017
HCRMA #2017-002365 TOLL (SEGS. 1 & 2)
0921-02-368
0921-02-368
71%
Description
Johnson Bros Corp., a Southland Company
Anderson Columbia Company, Inc.
Pulice
Webber, LLC
% Over/Under
20%
38%
49%
Company
1264 CALENDAR DAYS
HIDALGO
0.07 mi north of US 281 (Military Highway)
Lane-Abrams Toll 365 Joint Venture
CONTROLLED ACCESS TOLL FACILITY
0.58 mi west of FM 396 (Anzalduas Hwy)
12.22
365TOLL
65%
EACH 1.00 6,000.00 1 4,000.00
2 4,100.00
3 3,800.00
4 5,700.00
5 5,800.00
EACH 32.00 5,500.00 1 3,700.00
2 3,700.00
3 3,400.00
4 5,700.00
5 3,800.00
EACH 5.00 5,500.00 1 3,000.00
2 3,000.00
3 2,700.00
4 5,600.00
5 2,850.00
EACH 6.00 4,000.00 1 2,475.00
2 2,500.00
3 2,300.00
4 3,900.00
5 2,500.00
EACH 41.00 4,000.00 1 2,550.00
2 2,560.00
3 2,200.00
4 4,200.00
5 2,150.00
EACH 10.00 3,500.00 1 2,725.00
2 2,750.00
3 2,500.00
4 5,600.00
5 1,850.00
SQUARE FOOT 94.00 25.00 1 31.00
2 31.00
3 29.00
4 30.00
5 16.50
SQUARE FOOT 4,653.00 25.00 1 22.00
2 22.00
3 20.00
4 30.00
5 21.00
636-6002 ALUMINUM SIGNS (TY G)
628-6145 ELC SRV TY D 120/240 060(NS)SS(E)SP(O)
628-6148 ELC SRV TY D 120/240 060(NS)SS(E)TS(O)
628-6252 ELC SRV TY D 120/240 100(NS)SS(N)TP(O)
628-9001 ELC SRV TY D 120/240 100(NS)SS(L)TP(O)
636-6001 ALUMINUM SIGNS (TY A)
628-6044 ELC SRV TY A 240/480 060(NS)SS(E)PS(U)
628-6045 ELC SRV TY A 240/480 060(NS)SS(E)SP(O)
Date Prepared: 11/10/2017 Page: 36 of 61
County: Let Date:
Type: Bid No:
Time: Project ID:
Highway: Contract #:
Length: CCSJ:
From: To:
Estimate $ 168,951,004.96
Bidder 1 $ 202,548,591.57
Bidder 2 $ 233,445,739.29
Bidder 3 $ 252,286,943.96
Bidder 4 $ 279,428,828.61
Bidder 5 $ 289,374,971.13
Item CodeUnit Quantity Unit Est. Bidder Unit Bid
Exibit 2. Tabulation of Bids for HCRMA BID #2017-002 for the 365 Toll Project
Contract No. 0921-02-368
11/10/2017
HCRMA #2017-002365 TOLL (SEGS. 1 & 2)
0921-02-368
0921-02-368
71%
Description
Johnson Bros Corp., a Southland Company
Anderson Columbia Company, Inc.
Pulice
Webber, LLC
% Over/Under
20%
38%
49%
Company
1264 CALENDAR DAYS
HIDALGO
0.07 mi north of US 281 (Military Highway)
Lane-Abrams Toll 365 Joint Venture
CONTROLLED ACCESS TOLL FACILITY
0.58 mi west of FM 396 (Anzalduas Hwy)
12.22
365TOLL
65%
SQUARE FOOT 1,564.75 25.00 1 22.00
2 22.00
3 22.00
4 21.00
5 28.00
EACH 324.00 420.00 1 595.00
2 600.00
3 555.67
4 420.00
5 451.00
EACH 185.00 600.00 1 695.00
2 700.00
3 647.27
4 590.00
5 618.00
EACH 34.00 750.00 1 797.00
2 800.00
3 800.00
4 690.00
5 895.00
EACH 3.00 850.00 1 980.00
2 980.00
3 914.14
4 720.00
5 963.00
EACH 14.00 1,200.00 1 1,029.00
2 1,030.00
3 1,100.00
4 850.00
5 960.00
EACH 2.00 930.00 1 1,695.00
2 1,700.00
3 1,500.00
4 930.00
5 1,320.00
EACH 20.00 1,500.00 1 1,630.00
2 1,640.00
3 1,400.00
4 1,200.00
5 2,300.00
644-6034 IN SM RD SN SUP&AM TYS80(1)SA(U-
1EXT)
644-6038 IN SM RD SN SUP&AM TYS80(1)SA(U-
EXAL)
644-6051 IN SM RD SN SUP&AM TYS80(2)SA(P-
EXAL)
644-6064 IN BRIDGE MNT CLEARANCE SGN
ASSM(TY N)
636-6003 ALUMINUM SIGNS (TY O)
644-6027 IN SM RD SN SUP&AM TYS80(1)SA(P)
644-6030 IN SM RD SN SUP&AM TYS80(1)SA(T)
644-6033 IN SM RD SN SUP&AM TYS80(1)SA(U)
Date Prepared: 11/10/2017 Page: 37 of 61
County: Let Date:
Type: Bid No:
Time: Project ID:
Highway: Contract #:
Length: CCSJ:
From: To:
Estimate $ 168,951,004.96
Bidder 1 $ 202,548,591.57
Bidder 2 $ 233,445,739.29
Bidder 3 $ 252,286,943.96
Bidder 4 $ 279,428,828.61
Bidder 5 $ 289,374,971.13
Item CodeUnit Quantity Unit Est. Bidder Unit Bid
Exibit 2. Tabulation of Bids for HCRMA BID #2017-002 for the 365 Toll Project
Contract No. 0921-02-368
11/10/2017
HCRMA #2017-002365 TOLL (SEGS. 1 & 2)
0921-02-368
0921-02-368
71%
Description
Johnson Bros Corp., a Southland Company
Anderson Columbia Company, Inc.
Pulice
Webber, LLC
% Over/Under
20%
38%
49%
Company
1264 CALENDAR DAYS
HIDALGO
0.07 mi north of US 281 (Military Highway)
Lane-Abrams Toll 365 Joint Venture
CONTROLLED ACCESS TOLL FACILITY
0.58 mi west of FM 396 (Anzalduas Hwy)
12.22
365TOLL
65%
EACH 12.00 2,000.00 1 1,757.00
2 1,770.00
3 2,900.00
4 1,950.00
5 2,490.00
EACH 30.00 1,800.00 1 3,822.00
2 3,860.00
3 2,500.00
4 2,500.00
5 5,120.00
EACH 61.00 60.00 1 62.00
2 62.00
3 84.00
4 59.00
5 111.00
POUND 28,374.00 5.00 1 4.50
2 4.50
3 4.00
4 5.70
5 4.80
EACH 4.00 26,000.00 1 28,625.00
2 28,900.00
3 27,000.00
4 29,000.00
5 22,400.00
EACH 13.00 15,500.00 1 24,950.00
2 25,000.00
3 23,000.00
4 15,900.00
5 18,800.00
EACH 4.00 19,500.00 1 41,164.00
2 41,300.00
3 38,000.00
4 16,800.00
5 34,300.00
EACH 1.00 20,000.00 1 32,700.00
2 33,000.00
3 30,000.00
4 22,000.00
5 27,350.00
650-6038 INS OH SN SUP(35 FT CANT)
650-6045 INS OH SN SUP(40 FT CANT)
644-6066 IN SM RD SN SUP&AM (RAIL MOUNT)
644-6076 REMOVE SM RD SN SUP&AM
647-6001 INSTALL LRSS (STRUCT STEEL)
650-6028 INS OH SN SUP(30 FT BAL TEE)
650-6032 INS OH SN SUP(30 FT CANT)
644-6065 IN BRIDGE MNT CLEARANCE SGN
ASSM(TY S)
Date Prepared: 11/10/2017 Page: 38 of 61
County: Let Date:
Type: Bid No:
Time: Project ID:
Highway: Contract #:
Length: CCSJ:
From: To:
Estimate $ 168,951,004.96
Bidder 1 $ 202,548,591.57
Bidder 2 $ 233,445,739.29
Bidder 3 $ 252,286,943.96
Bidder 4 $ 279,428,828.61
Bidder 5 $ 289,374,971.13
Item CodeUnit Quantity Unit Est. Bidder Unit Bid
Exibit 2. Tabulation of Bids for HCRMA BID #2017-002 for the 365 Toll Project
Contract No. 0921-02-368
11/10/2017
HCRMA #2017-002365 TOLL (SEGS. 1 & 2)
0921-02-368
0921-02-368
71%
Description
Johnson Bros Corp., a Southland Company
Anderson Columbia Company, Inc.
Pulice
Webber, LLC
% Over/Under
20%
38%
49%
Company
1264 CALENDAR DAYS
HIDALGO
0.07 mi north of US 281 (Military Highway)
Lane-Abrams Toll 365 Joint Venture
CONTROLLED ACCESS TOLL FACILITY
0.58 mi west of FM 396 (Anzalduas Hwy)
12.22
365TOLL
65%
EACH 1.00 32,000.00 1 37,600.00
2 37,900.00
3 35,000.00
4 32,000.00
5 35,000.00
EACH 8.00 50,000.00 1 104,600.00
2 105,000.00
3 98,000.00
4 54,000.00
5 95,000.00
EACH 76.00 40.00 1 62.00
2 61.00
3 58.00
4 66.00
5 40.75
EACH 97.00 12.00 1 14.00
2 14.00
3 13.00
4 20.00
5 19.30
EACH 10.00 20.00 1 14.50
2 14.00
3 14.00
4 20.00
5 7.00
EACH 43.00 105.00 1 62.00
2 62.00
3 60.00
4 66.00
5 40.75
EACH 90.00 18.00 1 53.00
2 54.00
3 60.00
4 20.00
5 14.00
EACH 42.00 20.00 1 14.00
2 14.00
3 13.00
4 20.00
5 23.80
658-6013 INSTL DEL ASSM (D-SW)SZ (BRF)CTB
658-6014 INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
658-6018 INSTL DEL ASSM (D-SY)SZ 1(FLX)GND
658-6022 INSTL DEL ASSM (D-SY)SZ 1(FLX)GF2
658-6026 INSTL DEL ASSM (D-SY)SZ (BRF)CTB
650-6079 INS OH SN SUP(70 FT BRDG)
650-6139 INS OH SN SUP(130 FT BRDG)
658-6001 INSTL DEL ASSM (D-SW)SZ 1(FLX)GND
Date Prepared: 11/10/2017 Page: 39 of 61
County: Let Date:
Type: Bid No:
Time: Project ID:
Highway: Contract #:
Length: CCSJ:
From: To:
Estimate $ 168,951,004.96
Bidder 1 $ 202,548,591.57
Bidder 2 $ 233,445,739.29
Bidder 3 $ 252,286,943.96
Bidder 4 $ 279,428,828.61
Bidder 5 $ 289,374,971.13
Item CodeUnit Quantity Unit Est. Bidder Unit Bid
Exibit 2. Tabulation of Bids for HCRMA BID #2017-002 for the 365 Toll Project
Contract No. 0921-02-368
11/10/2017
HCRMA #2017-002365 TOLL (SEGS. 1 & 2)
0921-02-368
0921-02-368
71%
Description
Johnson Bros Corp., a Southland Company
Anderson Columbia Company, Inc.
Pulice
Webber, LLC
% Over/Under
20%
38%
49%
Company
1264 CALENDAR DAYS
HIDALGO
0.07 mi north of US 281 (Military Highway)
Lane-Abrams Toll 365 Joint Venture
CONTROLLED ACCESS TOLL FACILITY
0.58 mi west of FM 396 (Anzalduas Hwy)
12.22
365TOLL
65%
EACH 56.00 18.00 1 15.00
2 15.00
3 14.00
4 20.00
5 26.00
EACH 32.00 80.00 1 62.00
2 61.00
3 60.00
4 66.00
5 40.75
EACH 116.00 52.00 1 65.00
2 65.00
3 60.00
4 66.00
5 46.00
EACH 150.00 26.00 1 18.00
2 19.00
3 17.00
4 20.00
5 34.00
EACH 221.00 20.00 1 15.00
2 15.00
3 14.00
4 20.00
5 35.00
EACH 141.00 18.00 1 15.00
2 15.00
3 14.00
4 20.00
5 35.00
EACH 42.00 25.00 1 16.00
2 15.00
3 15.00
4 20.00
5 36.00
EACH 18.00 20.00 1 14.00
2 14.00
3 14.00
4 20.00
5 36.00
658-6064 INSTL DEL ASSM (D-SY)SZ 1(BRF)GF2
658-6067 INSTL DEL ASSM (D-DW)SZ 1(BRF)GF2
658-9001 INSTL DEL ASSM (D-DW)SZ (BRF)CTB
658-6027 INSTL DEL ASSM (D-SY)SZ (BRF)CTB (BI)
658-6036 INSTL DEL ASSM (D-DW)SZ 1(FLX)GND
658-6048 INSTL OM ASSM (OM-2Z)(FLX)GND
658-6061 INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
658-6062 INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
Date Prepared: 11/10/2017 Page: 40 of 61
County: Let Date:
Type: Bid No:
Time: Project ID:
Highway: Contract #:
Length: CCSJ:
From: To:
Estimate $ 168,951,004.96
Bidder 1 $ 202,548,591.57
Bidder 2 $ 233,445,739.29
Bidder 3 $ 252,286,943.96
Bidder 4 $ 279,428,828.61
Bidder 5 $ 289,374,971.13
Item CodeUnit Quantity Unit Est. Bidder Unit Bid
Exibit 2. Tabulation of Bids for HCRMA BID #2017-002 for the 365 Toll Project
Contract No. 0921-02-368
11/10/2017
HCRMA #2017-002365 TOLL (SEGS. 1 & 2)
0921-02-368
0921-02-368
71%
Description
Johnson Bros Corp., a Southland Company
Anderson Columbia Company, Inc.
Pulice
Webber, LLC
% Over/Under
20%
38%
49%
Company
1264 CALENDAR DAYS
HIDALGO
0.07 mi north of US 281 (Military Highway)
Lane-Abrams Toll 365 Joint Venture
CONTROLLED ACCESS TOLL FACILITY
0.58 mi west of FM 396 (Anzalduas Hwy)
12.22
365TOLL
65%
LINEAR FOOT 13,612.00 0.50 1 0.50
2 0.40
3 0.40
4 0.65
5 0.40
LINEAR FOOT 13,612.00 0.40 1 0.50
2 0.40
3 0.40
4 0.65
5 0.40
EACH 323.00 4.00 1 4.00
2 4.00
3 4.00
4 5.15
5 4.00
LINEAR FOOT 20,292.00 0.60 1 0.60
2 0.56
3 0.55
4 1.25
5 0.55
LINEAR FOOT 29,032.00 0.82 1 0.60
2 0.56
3 0.40
4 1.25
5 0.55
EACH 16,678.00 0.80 1 1.50
2 1.40
3 1.25
4 1.00
5 0.80
EACH 7,121.00 0.33 1 1.10
2 1.40
3 1.25
4 1.00
5 0.40
LINEAR FOOT 362.00 1.20 1 0.33
2 0.33
3 0.55
4 2.55
5 0.30
666-6006 REFL PAV MRK TY I (W)4"(DOT)(100MIL)
662-6050 WK ZN PAV MRK REMOV (REFL) TY II-A-A
662-6063 WK ZN PAV MRK REMOV (W)4"(SLD)
662-6095 WK ZN PAV MRK REMOV (Y)4"(SLD)
662-6109 WK ZN PAV MRK SHT TERM (TAB)TY W
662-6111 WK ZN PAV MRK SHT TERM (TAB)TY Y-2
662-6004 WK ZN PAV MRK NON-REMOV
(W)4"(SLD)
662-6034 WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
Date Prepared: 11/10/2017 Page: 41 of 61
County: Let Date:
Type: Bid No:
Time: Project ID:
Highway: Contract #:
Length: CCSJ:
From: To:
Estimate $ 168,951,004.96
Bidder 1 $ 202,548,591.57
Bidder 2 $ 233,445,739.29
Bidder 3 $ 252,286,943.96
Bidder 4 $ 279,428,828.61
Bidder 5 $ 289,374,971.13
Item CodeUnit Quantity Unit Est. Bidder Unit Bid
Exibit 2. Tabulation of Bids for HCRMA BID #2017-002 for the 365 Toll Project
Contract No. 0921-02-368
11/10/2017
HCRMA #2017-002365 TOLL (SEGS. 1 & 2)
0921-02-368
0921-02-368
71%
Description
Johnson Bros Corp., a Southland Company
Anderson Columbia Company, Inc.
Pulice
Webber, LLC
% Over/Under
20%
38%
49%
Company
1264 CALENDAR DAYS
HIDALGO
0.07 mi north of US 281 (Military Highway)
Lane-Abrams Toll 365 Joint Venture
CONTROLLED ACCESS TOLL FACILITY
0.58 mi west of FM 396 (Anzalduas Hwy)
12.22
365TOLL
65%
LINEAR FOOT 117.00 3.00 1 1.00
2 1.00
3 0.55
4 3.40
5 1.00
LINEAR FOOT 42,481.00 0.72 1 0.75
2 0.70
3 0.80
4 0.80
5 0.70
LINEAR FOOT 175.00 5.00 1 1.50
2 1.50
3 1.50
4 5.15
5 1.50
LINEAR FOOT 4,379.00 2.70 1 1.10
2 1.10
3 1.05
4 3.60
5 1.05
LINEAR FOOT 2,306.00 5.75 1 3.00
2 3.00
3 3.00
4 5.90
5 3.00
LINEAR FOOT 1,514.00 0.75 1 1.00
2 1.00
3 1.00
4 2.55
5 1.00
LINEAR FOOT 1,465.00 2.00 1 1.50
2 1.50
3 1.50
4 3.45
5 1.50
LINEAR FOOT 3,248.00 6.00 1 3.00
2 3.00
3 3.00
4 6.20
5 3.00
666-6048 REFL PAV MRK TY I (W)24"(SLD)(100MIL)
666-6138 REFL PAV MRK TY I (Y)8"(SLD)(100MIL)
666-6141 REFL PAV MRK TY I (Y)12"(SLD)(100MIL)
666-6147 REFL PAV MRK TY I (Y)24"(SLD)(100MIL)
666-6033 REFL PAV MRK TY I (W)8"(LNDP)(100MIL)
666-6036 REFL PAV MRK TY I (W)8"(SLD)(100MIL)
666-6039 REFL PAV MRK TY I
(W)12"(LNDP)(100MIL)
666-6042 REFL PAV MRK TY I (W)12"(SLD)(100MIL)
Date Prepared: 11/10/2017 Page: 42 of 61
County: Let Date:
Type: Bid No:
Time: Project ID:
Highway: Contract #:
Length: CCSJ:
From: To:
Estimate $ 168,951,004.96
Bidder 1 $ 202,548,591.57
Bidder 2 $ 233,445,739.29
Bidder 3 $ 252,286,943.96
Bidder 4 $ 279,428,828.61
Bidder 5 $ 289,374,971.13
Item CodeUnit Quantity Unit Est. Bidder Unit Bid
Exibit 2. Tabulation of Bids for HCRMA BID #2017-002 for the 365 Toll Project
Contract No. 0921-02-368
11/10/2017
HCRMA #2017-002365 TOLL (SEGS. 1 & 2)
0921-02-368
0921-02-368
71%
Description
Johnson Bros Corp., a Southland Company
Anderson Columbia Company, Inc.
Pulice
Webber, LLC
% Over/Under
20%
38%
49%
Company
1264 CALENDAR DAYS
HIDALGO
0.07 mi north of US 281 (Military Highway)
Lane-Abrams Toll 365 Joint Venture
CONTROLLED ACCESS TOLL FACILITY
0.58 mi west of FM 396 (Anzalduas Hwy)
12.22
365TOLL
65%
LINEAR FOOT 41,650.00 0.90 1 1.00
2 0.90
3 1.00
4 0.80
5 0.90
LINEAR FOOT 470,953.00 0.10 1 0.10
2 0.10
3 0.10
4 0.10
5 0.10
LINEAR FOOT 39,979.00 0.35 1 0.20
2 0.20
3 0.20
4 0.20
5 0.20
LINEAR FOOT 5,571.00 1.25 1 0.30
2 0.30
3 0.30
4 1.25
5 0.30
LINEAR FOOT 1,045.00 2.00 1 0.61
2 0.60
3 0.60
4 2.05
5 0.60
EACH 40.00 50.00 1 4.00
2 4.00
3 4.00
4 36.00
5 4.00
EACH 38.00 55.00 1 4.00
2 4.00
3 4.00
4 41.00
5 4.00
EACH 14.00 100.00 1 6.00
2 6.00
3 6.00
4 41.00
5 6.00
666-6232 PAVEMENT SEALER (WORD)
666-6234 PAVEMENT SEALER (DBL ARROW)
666-6224 PAVEMENT SEALER 4"
666-6226 PAVEMENT SEALER 8"
666-6228 PAVEMENT SEALER 12"
666-6230 PAVEMENT SEALER 24"
666-6231 PAVEMENT SEALER (ARROW)
666-6159 RE PV MRK TY
I(BLACK)4"(SHADOW)(100MIL)
Date Prepared: 11/10/2017 Page: 43 of 61
County: Let Date:
Type: Bid No:
Time: Project ID:
Highway: Contract #:
Length: CCSJ:
From: To:
Estimate $ 168,951,004.96
Bidder 1 $ 202,548,591.57
Bidder 2 $ 233,445,739.29
Bidder 3 $ 252,286,943.96
Bidder 4 $ 279,428,828.61
Bidder 5 $ 289,374,971.13
Item CodeUnit Quantity Unit Est. Bidder Unit Bid
Exibit 2. Tabulation of Bids for HCRMA BID #2017-002 for the 365 Toll Project
Contract No. 0921-02-368
11/10/2017
HCRMA #2017-002365 TOLL (SEGS. 1 & 2)
0921-02-368
0921-02-368
71%
Description
Johnson Bros Corp., a Southland Company
Anderson Columbia Company, Inc.
Pulice
Webber, LLC
% Over/Under
20%
38%
49%
Company
1264 CALENDAR DAYS
HIDALGO
0.07 mi north of US 281 (Military Highway)
Lane-Abrams Toll 365 Joint Venture
CONTROLLED ACCESS TOLL FACILITY
0.58 mi west of FM 396 (Anzalduas Hwy)
12.22
365TOLL
65%
EACH 9.00 110.00 1 6.00
2 6.00
3 6.00
4 38.00
5 6.00
EACH 62.00 3.50 1 2.00
2 2.00
3 2.00
4 13.50
5 2.00
LINEAR FOOT 34,535.00 0.35 1 0.30
2 0.30
3 0.30
4 0.45
5 0.30
LINEAR FOOT 237,996.00 0.30 1 0.29
2 0.30
3 0.30
4 0.40
5 0.30
LINEAR FOOT 590.00 1.00 1 0.30
2 0.30
3 0.30
4 1.05
5 0.30
LINEAR FOOT 230,623.00 0.28 1 0.29
2 0.30
3 0.30
4 0.40
5 0.30
EACH 28.00 350.00 1 278.00
2 280.00
3 275.00
4 480.00
5 275.00
EACH 32.00 680.00 1 404.00
2 405.00
3 400.00
4 750.00
5 400.00
666-6303 RE PM W/RET REQ TY I
(W)4"(SLD)(100MIL)
666-6312 RE PM W/RET REQ TY I
(Y)4"(BRK)(100MIL)
666-6315 RE PM W/RET REQ TY I
(Y)4"(SLD)(100MIL)
668-6019 PREFAB PAV MRK TY B (W)(ARROW)
668-6020 PREFAB PAV MRK TY B (W)(DBL ARROW)
666-6236 PAVEMENT SEALER (UTURN ARROW)
666-6243 PAVEMENT SEALER (YLD TRI)
666-6300 RE PM W/RET REQ TY I
(W)4"(BRK)(100MIL)
Date Prepared: 11/10/2017 Page: 44 of 61
County: Let Date:
Type: Bid No:
Time: Project ID:
Highway: Contract #:
Length: CCSJ:
From: To:
Estimate $ 168,951,004.96
Bidder 1 $ 202,548,591.57
Bidder 2 $ 233,445,739.29
Bidder 3 $ 252,286,943.96
Bidder 4 $ 279,428,828.61
Bidder 5 $ 289,374,971.13
Item CodeUnit Quantity Unit Est. Bidder Unit Bid
Exibit 2. Tabulation of Bids for HCRMA BID #2017-002 for the 365 Toll Project
Contract No. 0921-02-368
11/10/2017
HCRMA #2017-002365 TOLL (SEGS. 1 & 2)
0921-02-368
0921-02-368
71%
Description
Johnson Bros Corp., a Southland Company
Anderson Columbia Company, Inc.
Pulice
Webber, LLC
% Over/Under
20%
38%
49%
Company
1264 CALENDAR DAYS
HIDALGO
0.07 mi north of US 281 (Military Highway)
Lane-Abrams Toll 365 Joint Venture
CONTROLLED ACCESS TOLL FACILITY
0.58 mi west of FM 396 (Anzalduas Hwy)
12.22
365TOLL
65%
EACH 3.00 1,000.00 1 404.00
2 405.00
3 400.00
4 750.00
5 400.00
EACH 30.00 500.00 1 404.00
2 405.00
3 400.00
4 700.00
5 400.00
EACH 32.00 200.00 1 202.00
2 205.00
3 200.00
4 220.00
5 200.00
EACH 4.00 400.00 1 353.00
2 355.00
3 350.00
4 360.00
5 350.00
EACH 6.00 400.00 1 404.00
2 405.00
3 400.00
4 310.00
5 400.00
EACH 38.00 250.00 1 303.00
2 305.00
3 300.00
4 260.00
5 300.00
EACH 62.00 40.00 1 25.00
2 25.00
3 25.00
4 46.00
5 25.00
EACH 734.00 3.50 1 3.30
2 3.30
3 3.25
4 4.10
5 3.25
668-6085 PREFAB PAV MRK TY C (W) (WORD)
668-6092 PREFAB PAV MRK TY C (W) (36")(YLD TRI)
672-6006 REFL PAV MRKR TY I-A
668-6022 PREFAB PAV MRK TY B (W)(UTURN
ARROW)
668-6027 PREFAB PAV MRK TY B (W)(WORD)
668-6077 PREFAB PAV MRK TY C (W) (ARROW)
668-6078 PREFAB PAV MRK TY C (W) (DBL ARROW)
668-6080 PREFAB PAV MRK TY C (W) (UTURN
ARROW)
Date Prepared: 11/10/2017 Page: 45 of 61
County: Let Date:
Type: Bid No:
Time: Project ID:
Highway: Contract #:
Length: CCSJ:
From: To:
Estimate $ 168,951,004.96
Bidder 1 $ 202,548,591.57
Bidder 2 $ 233,445,739.29
Bidder 3 $ 252,286,943.96
Bidder 4 $ 279,428,828.61
Bidder 5 $ 289,374,971.13
Item CodeUnit Quantity Unit Est. Bidder Unit Bid
Exibit 2. Tabulation of Bids for HCRMA BID #2017-002 for the 365 Toll Project
Contract No. 0921-02-368
11/10/2017
HCRMA #2017-002365 TOLL (SEGS. 1 & 2)
0921-02-368
0921-02-368
71%
Description
Johnson Bros Corp., a Southland Company
Anderson Columbia Company, Inc.
Pulice
Webber, LLC
% Over/Under
20%
38%
49%
Company
1264 CALENDAR DAYS
HIDALGO
0.07 mi north of US 281 (Military Highway)
Lane-Abrams Toll 365 Joint Venture
CONTROLLED ACCESS TOLL FACILITY
0.58 mi west of FM 396 (Anzalduas Hwy)
12.22
365TOLL
65%
EACH 590.00 3.00 1 3.30
2 3.30
3 3.25
4 4.10
5 3.25
EACH 140.00 8.00 1 3.30
2 3.30
3 3.25
4 4.10
5 3.25
EACH 1,413.00 3.00 1 3.30
2 3.30
3 3.25
4 3.60
5 3.25
EACH 4,110.00 2.75 1 3.30
2 3.30
3 3.25
4 3.60
5 3.25
LINEAR FOOT 19,986.00 0.50 1 0.10
2 0.10
3 0.10
4 0.45
5 0.10
LINEAR FOOT 50.00 2.00 1 0.20
2 0.20
3 0.20
4 7.20
5 0.20
LINEAR FOOT 192.00 4.50 1 0.60
2 0.60
3 0.60
4 10.50
5 0.60
LINEAR FOOT 470,953.00 0.06 1 0.10
2 0.08
3 0.15
4 0.10
5 0.10
678-6001 PAV SURF PREP FOR MRK (4")
672-6009 REFL PAV MRKR TY II-A-A
672-6010 REFL PAV MRKR TY II-C-R
677-6001 ELIM EXT PAV MRK & MRKS (4")
677-6003 ELIM EXT PAV MRK & MRKS (8")
677-6007 ELIM EXT PAV MRK & MRKS (24")
672-6007 REFL PAV MRKR TY I-C
672-6008 REFL PAV MRKR TY I-R
Date Prepared: 11/10/2017 Page: 46 of 61
County: Let Date:
Type: Bid No:
Time: Project ID:
Highway: Contract #:
Length: CCSJ:
From: To:
Estimate $ 168,951,004.96
Bidder 1 $ 202,548,591.57
Bidder 2 $ 233,445,739.29
Bidder 3 $ 252,286,943.96
Bidder 4 $ 279,428,828.61
Bidder 5 $ 289,374,971.13
Item CodeUnit Quantity Unit Est. Bidder Unit Bid
Exibit 2. Tabulation of Bids for HCRMA BID #2017-002 for the 365 Toll Project
Contract No. 0921-02-368
11/10/2017
HCRMA #2017-002365 TOLL (SEGS. 1 & 2)
0921-02-368
0921-02-368
71%
Description
Johnson Bros Corp., a Southland Company
Anderson Columbia Company, Inc.
Pulice
Webber, LLC
% Over/Under
20%
38%
49%
Company
1264 CALENDAR DAYS
HIDALGO
0.07 mi north of US 281 (Military Highway)
Lane-Abrams Toll 365 Joint Venture
CONTROLLED ACCESS TOLL FACILITY
0.58 mi west of FM 396 (Anzalduas Hwy)
12.22
365TOLL
65%
LINEAR FOOT 39,979.00 0.10 1 0.16
2 0.16
3 0.16
4 0.25
5 0.15
LINEAR FOOT 5,571.00 0.60 1 0.25
2 0.25
3 0.24
4 0.65
5 0.25
LINEAR FOOT 1,045.00 1.10 1 0.50
2 0.50
3 0.50
4 0.70
5 0.50
EACH 40.00 50.00 1 0.65
2 0.66
3 0.65
4 23.00
5 0.65
EACH 14.00 100.00 1 0.65
2 0.66
3 0.65
4 23.00
5 0.65
EACH 9.00 100.00 1 0.65
2 0.66
3 0.65
4 23.00
5 0.65
EACH 46.00 55.00 1 0.65
2 0.66
3 0.65
4 23.00
5 0.65
EACH 62.00 5.00 1 0.65
2 0.66
3 0.65
4 10.50
5 0.65
678-6010 PAV SURF PREP FOR MRK (DBL ARROW)
678-6012 PAV SURF PREP FOR MRK (UTURN ARR)
678-6016 PAV SURF PREP FOR MRK (WORD)
678-6023 PAV SURF PREP FOR MRK (36")(YLD TRI)
678-6004 PAV SURF PREP FOR MRK (8")
678-6006 PAV SURF PREP FOR MRK (12")
678-6008 PAV SURF PREP FOR MRK (24")
678-6009 PAV SURF PREP FOR MRK (ARROW)
Date Prepared: 11/10/2017 Page: 47 of 61
County: Let Date:
Type: Bid No:
Time: Project ID:
Highway: Contract #:
Length: CCSJ:
From: To:
Estimate $ 168,951,004.96
Bidder 1 $ 202,548,591.57
Bidder 2 $ 233,445,739.29
Bidder 3 $ 252,286,943.96
Bidder 4 $ 279,428,828.61
Bidder 5 $ 289,374,971.13
Item CodeUnit Quantity Unit Est. Bidder Unit Bid
Exibit 2. Tabulation of Bids for HCRMA BID #2017-002 for the 365 Toll Project
Contract No. 0921-02-368
11/10/2017
HCRMA #2017-002365 TOLL (SEGS. 1 & 2)
0921-02-368
0921-02-368
71%
Description
Johnson Bros Corp., a Southland Company
Anderson Columbia Company, Inc.
Pulice
Webber, LLC
% Over/Under
20%
38%
49%
Company
1264 CALENDAR DAYS
HIDALGO
0.07 mi north of US 281 (Military Highway)
Lane-Abrams Toll 365 Joint Venture
CONTROLLED ACCESS TOLL FACILITY
0.58 mi west of FM 396 (Anzalduas Hwy)
12.22
365TOLL
65%
EACH 4,220.00 1.25 1 0.65
2 0.66
3 0.65
4 0.15
5 0.65
EACH 6.00 3,000.00 1 5,600.00
2 5,660.00
3 5,200.00
4 780.00
5 1,100.00
EACH 5.00 30,000.00 1 21,400.00
2 21,600.00
3 20,000.00
4 20,000.00
5 19,500.00
EACH 59.00 165.00 1 169.00
2 170.00
3 160.00
4 164.00
5 196.00
EACH 7.00 250.00 1 169.00
2 170.00
3 160.00
4 158.00
5 196.00
EACH 83.00 160.00 1 169.00
2 170.00
3 160.00
4 156.00
5 196.00
EACH 7.00 200.00 1 169.00
2 170.00
3 160.00
4 158.00
5 196.00
EACH 71.00 200.00 1 169.00
2 170.00
3 160.00
4 157.00
5 196.00
682-6004 VEH SIG SEC (12")LED(YEL ARW)
682-6005 VEH SIG SEC (12")LED(RED)
680-6001 INSTALL HWY TRF SIG (FLASH BEACON)
680-6003 INSTALL HWY TRF SIG (SYSTEM)
682-6001 VEH SIG SEC (12")LED(GRN)
682-6002 VEH SIG SEC (12")LED(GRN ARW)
682-6003 VEH SIG SEC (12")LED(YEL)
678-6033 PAV SURF PREP FOR MRK (RPM)
Date Prepared: 11/10/2017 Page: 48 of 61
County: Let Date:
Type: Bid No:
Time: Project ID:
Highway: Contract #:
Length: CCSJ:
From: To:
Estimate $ 168,951,004.96
Bidder 1 $ 202,548,591.57
Bidder 2 $ 233,445,739.29
Bidder 3 $ 252,286,943.96
Bidder 4 $ 279,428,828.61
Bidder 5 $ 289,374,971.13
Item CodeUnit Quantity Unit Est. Bidder Unit Bid
Exibit 2. Tabulation of Bids for HCRMA BID #2017-002 for the 365 Toll Project
Contract No. 0921-02-368
11/10/2017
HCRMA #2017-002365 TOLL (SEGS. 1 & 2)
0921-02-368
0921-02-368
71%
Description
Johnson Bros Corp., a Southland Company
Anderson Columbia Company, Inc.
Pulice
Webber, LLC
% Over/Under
20%
38%
49%
Company
1264 CALENDAR DAYS
HIDALGO
0.07 mi north of US 281 (Military Highway)
Lane-Abrams Toll 365 Joint Venture
CONTROLLED ACCESS TOLL FACILITY
0.58 mi west of FM 396 (Anzalduas Hwy)
12.22
365TOLL
65%
EACH 8.00 200.00 1 169.00
2 170.00
3 160.00
4 157.00
5 196.00
EACH 10.00 550.00 1 300.00
2 305.00
3 280.00
4 420.00
5 450.00
EACH 14.00 80.00 1 57.00
2 58.00
3 50.00
4 81.00
5 65.00
EACH 59.00 70.00 1 68.00
2 69.00
3 65.00
4 69.00
5 75.00
EACH 3.00 100.00 1 80.00
2 80.00
3 75.00
4 75.00
5 85.00
LINEAR FOOT 9,392.00 1.90 1 1.40
2 1.40
3 1.30
4 1.90
5 1.50
LINEAR FOOT 1,666.00 5.00 1 1.60
2 1.60
3 1.50
4 1.95
5 2.00
LINEAR FOOT 926.00 2.25 1 0.80
2 0.80
3 0.75
4 2.70
5 0.70
682-6023 BACK PLATE (12")(3 SEC)
682-6024 BACK PLATE (12")(4 SEC)
684-6010 TRF SIG CBL (TY A)(12 AWG)(5 CONDR)
684-6012 TRF SIG CBL (TY A)(12 AWG)(7 CONDR)
684-6027 TRF SIG CBL (TY A)(14 AWG)(1 CONDR)
682-6006 VEH SIG SEC (12")LED(RED ARW)
682-6018 PED SIG SEC (LED)(COUNTDOWN)
682-6021 BACK PLATE (12")(1 SEC)
Date Prepared: 11/10/2017 Page: 49 of 61
County: Let Date:
Type: Bid No:
Time: Project ID:
Highway: Contract #:
Length: CCSJ:
From: To:
Estimate $ 168,951,004.96
Bidder 1 $ 202,548,591.57
Bidder 2 $ 233,445,739.29
Bidder 3 $ 252,286,943.96
Bidder 4 $ 279,428,828.61
Bidder 5 $ 289,374,971.13
Item CodeUnit Quantity Unit Est. Bidder Unit Bid
Exibit 2. Tabulation of Bids for HCRMA BID #2017-002 for the 365 Toll Project
Contract No. 0921-02-368
11/10/2017
HCRMA #2017-002365 TOLL (SEGS. 1 & 2)
0921-02-368
0921-02-368
71%
Description
Johnson Bros Corp., a Southland Company
Anderson Columbia Company, Inc.
Pulice
Webber, LLC
% Over/Under
20%
38%
49%
Company
1264 CALENDAR DAYS
HIDALGO
0.07 mi north of US 281 (Military Highway)
Lane-Abrams Toll 365 Joint Venture
CONTROLLED ACCESS TOLL FACILITY
0.58 mi west of FM 396 (Anzalduas Hwy)
12.22
365TOLL
65%
LINEAR FOOT 9,867.00 1.55 1 0.85
2 0.85
3 0.75
4 1.65
5 1.20
EACH 4.00 4,500.00 1 5,300.00
2 5,300.00
3 4,900.00
4 4,200.00
5 2,850.00
EACH 20.00 4,500.00 1 6,000.00
2 6,070.00
3 5,600.00
4 4,500.00
5 4,300.00
EACH 1.00 4,000.00 1 6,740.00
2 6,800.00
3 6,300.00
4 3,900.00
5 4,500.00
EACH 1.00 8,500.00 1 9,038.00
2 9,100.00
3 8,400.00
4 5,500.00
5 5,800.00
EACH 4.00 9,500.00 1 8,400.00
2 8,430.00
3 7,800.00
4 9,300.00
5 5,350.00
EACH 4.00 8,000.00 1 9,800.00
2 9,950.00
3 9,000.00
4 8,200.00
5 6,800.00
EACH 5.00 14,500.00 1 19,000.00
2 18,900.00
3 17,500.00
4 16,800.00
5 13,900.00
686-6045 INS TRF SIG PL AM(S)1 ARM(44')
686-6047 INS TRF SIG PL AM(S)1 ARM(44')LUM
686-6055 INS TRF SIG PL AM(S)1 ARM(50')LUM
684-6028 TRF SIG CBL (TY A)(14 AWG)(2 CONDR)
686-6019 INS TRF SIG PL AM (S)STR(TY D)
686-6020 INS TRF SIG PL AM (S)STR(TY D)LUM
686-6033 INS TRF SIG PL AM(S)1 ARM(32')
686-6042 INS TRF SIG PL AM(S)1 ARM(40')ILSN
Date Prepared: 11/10/2017 Page: 50 of 61
County: Let Date:
Type: Bid No:
Time: Project ID:
Highway: Contract #:
Length: CCSJ:
From: To:
Estimate $ 168,951,004.96
Bidder 1 $ 202,548,591.57
Bidder 2 $ 233,445,739.29
Bidder 3 $ 252,286,943.96
Bidder 4 $ 279,428,828.61
Bidder 5 $ 289,374,971.13
Item CodeUnit Quantity Unit Est. Bidder Unit Bid
Exibit 2. Tabulation of Bids for HCRMA BID #2017-002 for the 365 Toll Project
Contract No. 0921-02-368
11/10/2017
HCRMA #2017-002365 TOLL (SEGS. 1 & 2)
0921-02-368
0921-02-368
71%
Description
Johnson Bros Corp., a Southland Company
Anderson Columbia Company, Inc.
Pulice
Webber, LLC
% Over/Under
20%
38%
49%
Company
1264 CALENDAR DAYS
HIDALGO
0.07 mi north of US 281 (Military Highway)
Lane-Abrams Toll 365 Joint Venture
CONTROLLED ACCESS TOLL FACILITY
0.58 mi west of FM 396 (Anzalduas Hwy)
12.22
365TOLL
65%
EACH 2.00 16,500.00 1 19,000.00
2 19,300.00
3 18,000.00
4 16,500.00
5 14,500.00
EACH 6.00 1,500.00 1 1,700.00
2 1,720.00
3 1,600.00
4 1,410.00
5 900.00
EACH 10.00 1,000.00 1 878.00
2 880.00
3 800.00
4 630.00
5 1,180.00
LINEAR FOOT 7,593.00 6.50 1 13.00
2 13.00
3 12.00
4 6.40
5 10.00
EACH 1.00 5,000.00 1 5,000.00
2 5,100.00
3 4,700.00
4 470.00
5 3,500.00
LINEAR FOOT 156.00 7.00 1 4.50
2 4.20
3 15.00
4 5.00
5 4.00
SQUARE FOOT 1,630.00 35.00 1 0.31
2 73.00
3 50.00
4 31.00
5 31.00
EACH 6.00 6,000.00 1 11,000.00
2 9,200.00
3 19,000.00
4 9,100.00
5 10,150.00
1007-6001 IRRIGATION GATE (18")
688-6001 PED DETECT PUSH BUTTON (APS)
688-6004 VEH LP DETECT (SAWCUT)
690-6100 REMOVE TRAFFIC SIGNAL
772-6001 POST AND CABLE FENCE (REMOVAL)
786-6001 CARBON FIBER REINF POLYMER
PROTECTION
686-6059 INS TRF SIG PL AM(S)1 ARM(55')LUM
687-6001 PED POLE ASSEMBLY
Date Prepared: 11/10/2017 Page: 51 of 61
County: Let Date:
Type: Bid No:
Time: Project ID:
Highway: Contract #:
Length: CCSJ:
From: To:
Estimate $ 168,951,004.96
Bidder 1 $ 202,548,591.57
Bidder 2 $ 233,445,739.29
Bidder 3 $ 252,286,943.96
Bidder 4 $ 279,428,828.61
Bidder 5 $ 289,374,971.13
Item CodeUnit Quantity Unit Est. Bidder Unit Bid
Exibit 2. Tabulation of Bids for HCRMA BID #2017-002 for the 365 Toll Project
Contract No. 0921-02-368
11/10/2017
HCRMA #2017-002365 TOLL (SEGS. 1 & 2)
0921-02-368
0921-02-368
71%
Description
Johnson Bros Corp., a Southland Company
Anderson Columbia Company, Inc.
Pulice
Webber, LLC
% Over/Under
20%
38%
49%
Company
1264 CALENDAR DAYS
HIDALGO
0.07 mi north of US 281 (Military Highway)
Lane-Abrams Toll 365 Joint Venture
CONTROLLED ACCESS TOLL FACILITY
0.58 mi west of FM 396 (Anzalduas Hwy)
12.22
365TOLL
65%
EACH 1.00 5,000.00 1 15,000.00
2 12,000.00
3 23,000.00
4 11,800.00
5 14,210.00
EACH 4.00 7,000.00 1 8,000.00
2 9,300.00
3 6,800.00
4 9,200.00
5 7,610.00
EACH 13.00 1,500.00 1 5,400.00
2 2,060.00
3 5,000.00
4 2,000.00
5 5,080.00
EACH 1.00 6,000.00 1 5,700.00
2 6,100.00
3 5,300.00
4 10,000.00
5 5,380.00
EACH 8.00 5,000.00 1 3,770.00
2 9,200.00
3 7,500.00
4 9,100.00
5 3,550.00
EACH 11.00 7,000.00 1 10,765.00
2 8,300.00
3 10,000.00
4 8,200.00
5 10,150.00
EACH 3.00 9,000.00 1 37,700.00
2 14,900.00
3 35,000.00
4 14,600.00
5 106,600.00
EACH 1.00 6,500.00 1 10,765.00
2 7,850.00
3 10,000.00
4 7,700.00
5 10,150.00
1007-6009 IRRIGATION WELL (36")
1007-6013 IRRIGATION GATE (15")
1007-9005 IRRIGATION WELL (TYPE A)
1007-9006 IRRIGATION GATE (12")
1007-6002 IRRIGATION GATE (30")
1007-6005 IRRIGATION WELL (30")
1007-6007 IRRIGATION VALVE (12")
1007-6008 IRRIGATION WELL (48")
Date Prepared: 11/10/2017 Page: 52 of 61
County: Let Date:
Type: Bid No:
Time: Project ID:
Highway: Contract #:
Length: CCSJ:
From: To:
Estimate $ 168,951,004.96
Bidder 1 $ 202,548,591.57
Bidder 2 $ 233,445,739.29
Bidder 3 $ 252,286,943.96
Bidder 4 $ 279,428,828.61
Bidder 5 $ 289,374,971.13
Item CodeUnit Quantity Unit Est. Bidder Unit Bid
Exibit 2. Tabulation of Bids for HCRMA BID #2017-002 for the 365 Toll Project
Contract No. 0921-02-368
11/10/2017
HCRMA #2017-002365 TOLL (SEGS. 1 & 2)
0921-02-368
0921-02-368
71%
Description
Johnson Bros Corp., a Southland Company
Anderson Columbia Company, Inc.
Pulice
Webber, LLC
% Over/Under
20%
38%
49%
Company
1264 CALENDAR DAYS
HIDALGO
0.07 mi north of US 281 (Military Highway)
Lane-Abrams Toll 365 Joint Venture
CONTROLLED ACCESS TOLL FACILITY
0.58 mi west of FM 396 (Anzalduas Hwy)
12.22
365TOLL
65%
EACH 3.00 18,000.00 1 2,700.00
2 2,050.00
3 2,500.00
4 2,000.00
5 2,540.00
EACH 3.00 12,000.00 1 1,615.00
2 1,680.00
3 1,500.00
4 1,650.00
5 1,520.00
EACH 1.00 12,000.00 1 10,765.00
2 14,000.00
3 10,000.00
4 13,800.00
5 10,150.00
EACH 2.00 12,000.00 1 5,382.00
2 7,850.00
3 5,000.00
4 7,700.00
5 5,080.00
EACH 1.00 10,000.00 1 8,075.00
2 10,200.00
3 7,500.00
4 10,800.00
5 7,610.00
LINEAR FOOT 5,874.00 62.00 1 48.00
2 34.00
3 45.00
4 34.00
5 45.75
LINEAR FOOT 343.00 70.00 1 59.00
2 53.00
3 55.00
4 52.00
5 55.75
LINEAR FOOT 604.00 85.00 1 119.00
2 90.00
3 110.00
4 88.00
5 112.00
1008-6002 PRSSR IRRIG PVC PIPE (24")
1008-6005 PRSSR IRRIG PVC PIPE (30")
1007-9011 ALFALFA VALVE (12")
1007-9012 IRRIGATION VALVE (21")
1007-9013 IRRIGATION GATE
1007-9014 IRRIGATION WELL (54")
1008-6001 PRSSR IRRIG PVC PIPE (18")
1007-9009 ALFALFA VALVE (18")
Date Prepared: 11/10/2017 Page: 53 of 61
County: Let Date:
Type: Bid No:
Time: Project ID:
Highway: Contract #:
Length: CCSJ:
From: To:
Estimate $ 168,951,004.96
Bidder 1 $ 202,548,591.57
Bidder 2 $ 233,445,739.29
Bidder 3 $ 252,286,943.96
Bidder 4 $ 279,428,828.61
Bidder 5 $ 289,374,971.13
Item CodeUnit Quantity Unit Est. Bidder Unit Bid
Exibit 2. Tabulation of Bids for HCRMA BID #2017-002 for the 365 Toll Project
Contract No. 0921-02-368
11/10/2017
HCRMA #2017-002365 TOLL (SEGS. 1 & 2)
0921-02-368
0921-02-368
71%
Description
Johnson Bros Corp., a Southland Company
Anderson Columbia Company, Inc.
Pulice
Webber, LLC
% Over/Under
20%
38%
49%
Company
1264 CALENDAR DAYS
HIDALGO
0.07 mi north of US 281 (Military Highway)
Lane-Abrams Toll 365 Joint Venture
CONTROLLED ACCESS TOLL FACILITY
0.58 mi west of FM 396 (Anzalduas Hwy)
12.22
365TOLL
65%
LINEAR FOOT 2,008.00 25.00 1 36.00
2 27.00
3 33.00
4 27.00
5 33.50
LINEAR FOOT 300.00 100.00 1 59.00
2 50.00
3 311.00
4 49.00
5 55.75
LINEAR FOOT 1,162.00 90.00 1 161.00
2 137.00
3 150.00
4 135.00
5 152.00
LINEAR FOOT 10.00 100.00 1 177.00
2 118.00
3 165.00
4 116.00
5 168.00
LINEAR FOOT 740.00 100.00 1 140.00
2 85.00
3 130.00
4 84.00
5 132.00
LINEAR FOOT 12.00 150.00 1 150.00
2 100.00
3 140.00
4 98.00
5 142.00
LINEAR FOOT 742.00 120.00 1 177.00
2 130.00
3 165.00
4 130.00
5 168.00
LINEAR FOOT 1,265.00 200.00 1 230.00
2 195.00
3 215.00
4 193.00
5 218.00
4024-6002 RC LOW HEAD PRSSR PIPE (CL III)(18")
4024-6005 RC LOW HEAD PRSSR PIPE (CL III)(36")
4024-9001 RC LOW HEAD PRSSR PIPE (CL III) (15")
4024-9002 RC LOW HEAD PRSSR PIPE (CL III) (48")
4024-9003 RC LOW HEAD PRSSR PIPE (CL III) (60")
1008-6006 PRSSR IRRIGATION PVC PIPE (15")
1008-9001 PRSSR IRRIG (PVC) PIPE (21")
1008-9002 PRSSR IRRIG (PVC) PIPE (36")
Date Prepared: 11/10/2017 Page: 54 of 61
County: Let Date:
Type: Bid No:
Time: Project ID:
Highway: Contract #:
Length: CCSJ:
From: To:
Estimate $ 168,951,004.96
Bidder 1 $ 202,548,591.57
Bidder 2 $ 233,445,739.29
Bidder 3 $ 252,286,943.96
Bidder 4 $ 279,428,828.61
Bidder 5 $ 289,374,971.13
Item CodeUnit Quantity Unit Est. Bidder Unit Bid
Exibit 2. Tabulation of Bids for HCRMA BID #2017-002 for the 365 Toll Project
Contract No. 0921-02-368
11/10/2017
HCRMA #2017-002365 TOLL (SEGS. 1 & 2)
0921-02-368
0921-02-368
71%
Description
Johnson Bros Corp., a Southland Company
Anderson Columbia Company, Inc.
Pulice
Webber, LLC
% Over/Under
20%
38%
49%
Company
1264 CALENDAR DAYS
HIDALGO
0.07 mi north of US 281 (Military Highway)
Lane-Abrams Toll 365 Joint Venture
CONTROLLED ACCESS TOLL FACILITY
0.58 mi west of FM 396 (Anzalduas Hwy)
12.22
365TOLL
65%
LINEAR FOOT 3,221.00 275.00 1 322.00
2 260.00
3 250.00
4 250.00
5 279.00
LINEAR FOOT 428.00 200.00 1 215.00
2 162.00
3 428.00
4 159.00
5 203.00
LINEAR FOOT 241,500.00 5.00 1 0.60
2 2.60
3 5.80
4 14.50
5 12.30
SQUARE YARD 40,347.00 2.50 1 3.25
2 2.70
3 2.00
4 1.85
5 2.50
LINEAR FOOT 440.00 75.00 1 36.00
2 29.00
3 33.00
4 29.00
5 33.50
LINEAR FOOT 420.00 125.00 1 115.00
2 110.00
3 106.00
4 109.00
5 108.00
EACH 4.00 3,000.00 1 17,225.00
2 16,400.00
3 1,600.00
4 16,100.00
5 16,240.00
EACH 2.00 4,000.00 1 26,400.00
2 25,700.00
3 24,500.00
4 25,000.00
5 24,870.00
5002-9001 WATER MAIN PIPE (PVC)(24IN)
(DR18)(C900)
5002-9002 18" GATE VALVE & BOX
5002-9003 24" GATE VALVE & BOX
4024-9004 RC LOW HEAD PRSSR PIPE (CL III) (72")
4024-9006 RC LOW HEAD PRSSR PIPE (CL V) (48")
4075-9001 WICK DRAINS
5000-6001 GEOGRID REINFORCE EMBANKMENTS (TY
A)
5002-6005 WATER MAIN PIPE
(PVC)(12IN)(DR18)(C900)
Date Prepared: 11/10/2017 Page: 55 of 61
County: Let Date:
Type: Bid No:
Time: Project ID:
Highway: Contract #:
Length: CCSJ:
From: To:
Estimate $ 168,951,004.96
Bidder 1 $ 202,548,591.57
Bidder 2 $ 233,445,739.29
Bidder 3 $ 252,286,943.96
Bidder 4 $ 279,428,828.61
Bidder 5 $ 289,374,971.13
Item CodeUnit Quantity Unit Est. Bidder Unit Bid
Exibit 2. Tabulation of Bids for HCRMA BID #2017-002 for the 365 Toll Project
Contract No. 0921-02-368
11/10/2017
HCRMA #2017-002365 TOLL (SEGS. 1 & 2)
0921-02-368
0921-02-368
71%
Description
Johnson Bros Corp., a Southland Company
Anderson Columbia Company, Inc.
Pulice
Webber, LLC
% Over/Under
20%
38%
49%
Company
1264 CALENDAR DAYS
HIDALGO
0.07 mi north of US 281 (Military Highway)
Lane-Abrams Toll 365 Joint Venture
CONTROLLED ACCESS TOLL FACILITY
0.58 mi west of FM 396 (Anzalduas Hwy)
12.22
365TOLL
65%
LINEAR FOOT 308.00 100.00 1 90.00
2 68.00
3 84.00
4 67.00
5 85.25
EACH 13.00 500.00 1 862.00
2 1,200.00
3 800.00
4 1,170.00
5 812.00
LUMP SUM 1.00 33,000.00 1 19,912.00
2 18,500.00
3 17,000.00
4 50,000.00
5 37,000.00
LINEAR FOOT 17,340.00 3.25 1 4.50
2 4.10
3 3.80
4 3.00
5 3.00
LINEAR FOOT 159,675.00 4.50 1 4.50
2 4.10
3 3.80
4 4.00
5 5.00
LINEAR FOOT 24,790.00 6.00 1 5.00
2 4.70
3 4.40
4 3.00
5 4.00
EACH 165.00 2,600.00 1 730.00
2 670.00
3 630.00
4 3,500.00
5 1,450.00
EACH 71.00 620.00 1 3,235.00
2 3,000.00
3 2,800.00
4 1,000.00
5 1,200.00
6007-6022 FIBER OPTIC PATCH PANEL (6 POSITION)
6003-6001 ITS SYSTEM SUPPORT EQUIPMENT
6007-6014 FIBER OPTIC CBL (SNGLE-MODE)(48
FIBER)
6007-6017 FIBER OPTIC CBL (SNGLE-MODE)(144
FIBER)
6007-6020 FIBER OPTIC PIGTAIL (12 FIBER)
6007-6021 FIBER OPTIC SPLICE ENCLOSURE
5002-9004 WATER MAIN PIPE
(PVC)(18IN)(DR18)(C900)
5002-9005 12 IN 45 DEG MJ BENDS
Date Prepared: 11/10/2017 Page: 56 of 61
County: Let Date:
Type: Bid No:
Time: Project ID:
Highway: Contract #:
Length: CCSJ:
From: To:
Estimate $ 168,951,004.96
Bidder 1 $ 202,548,591.57
Bidder 2 $ 233,445,739.29
Bidder 3 $ 252,286,943.96
Bidder 4 $ 279,428,828.61
Bidder 5 $ 289,374,971.13
Item CodeUnit Quantity Unit Est. Bidder Unit Bid
Exibit 2. Tabulation of Bids for HCRMA BID #2017-002 for the 365 Toll Project
Contract No. 0921-02-368
11/10/2017
HCRMA #2017-002365 TOLL (SEGS. 1 & 2)
0921-02-368
0921-02-368
71%
Description
Johnson Bros Corp., a Southland Company
Anderson Columbia Company, Inc.
Pulice
Webber, LLC
% Over/Under
20%
38%
49%
Company
1264 CALENDAR DAYS
HIDALGO
0.07 mi north of US 281 (Military Highway)
Lane-Abrams Toll 365 Joint Venture
CONTROLLED ACCESS TOLL FACILITY
0.58 mi west of FM 396 (Anzalduas Hwy)
12.22
365TOLL
65%
EACH 22.00 1,850.00 1 6,165.00
2 5,700.00
3 5,300.00
4 1,500.00
5 1,650.00
EACH 2,842.00 70.00 1 42.00
2 39.00
3 36.00
4 50.00
5 30.00
EACH 11.00 9,000.00 1 11,900.00
2 11,000.00
3 10,200.00
4 14,000.00
5 17,500.00
EACH 2.00 18,600.00 1 18,325.00
2 17,000.00
3 15,000.00
4 14,000.00
5 10,650.00
EACH 20.00 1,000.00 1 639.00
2 590.00
3 500.00
4 2,500.00
5 2,000.00
EACH 16.00 1,000.00 1 600.00
2 555.00
3 500.00
4 1,000.00
5 2,900.00
LINEAR FOOT 135,055.00 21.00 1 23.00
2 21.00
3 19.00
4 50.00
5 10.00
LINEAR FOOT 150.00 100.00 1 35.00
2 32.00
3 30.00
4 50.00
5 65.00
6010-6004 CCTV MOUNT (POLE)
6010-6008 CCTV MOUNT (PENDANT)
6016-6006 ITS MULTI-DUCT CND (PVC-40)
6016-6009 ITS MULTI-DUCT CND (PVC-40)(STL
ENCSE)
6007-6023 FIBER OPTIC PATCH PANEL (12 POSITION)
6007-6094 FIBER OPTIC FUSION SPLICE
6008-6027 ITS GRND MNT CAB (TY 4) (CONF 2)
6008-6043 ITS GRND MNT CAB (TY 6) (CONF 2)
Date Prepared: 11/10/2017 Page: 57 of 61
County: Let Date:
Type: Bid No:
Time: Project ID:
Highway: Contract #:
Length: CCSJ:
From: To:
Estimate $ 168,951,004.96
Bidder 1 $ 202,548,591.57
Bidder 2 $ 233,445,739.29
Bidder 3 $ 252,286,943.96
Bidder 4 $ 279,428,828.61
Bidder 5 $ 289,374,971.13
Item CodeUnit Quantity Unit Est. Bidder Unit Bid
Exibit 2. Tabulation of Bids for HCRMA BID #2017-002 for the 365 Toll Project
Contract No. 0921-02-368
11/10/2017
HCRMA #2017-002365 TOLL (SEGS. 1 & 2)
0921-02-368
0921-02-368
71%
Description
Johnson Bros Corp., a Southland Company
Anderson Columbia Company, Inc.
Pulice
Webber, LLC
% Over/Under
20%
38%
49%
Company
1264 CALENDAR DAYS
HIDALGO
0.07 mi north of US 281 (Military Highway)
Lane-Abrams Toll 365 Joint Venture
CONTROLLED ACCESS TOLL FACILITY
0.58 mi west of FM 396 (Anzalduas Hwy)
12.22
365TOLL
65%
LINEAR FOOT 10,905.00 25.00 1 25.00
2 23.00
3 22.00
4 25.00
5 11.00
LINEAR FOOT 595.00 35.00 1 65.00
2 60.00
3 55.00
4 40.00
5 38.00
LINEAR FOOT 7,055.00 55.00 1 85.00
2 78.00
3 73.00
4 82.00
5 110.00
EACH 403.00 30.00 1 133.00
2 124.00
3 115.00
4 2.00
5 150.00
LINEAR FOOT 2,515.00 125.00 1 77.00
2 71.00
3 66.00
4 30.00
5 65.00
EACH 4.00 7,000.00 1 7,350.00
2 6,800.00
3 6,300.00
4 6,200.00
5 6,800.00
EACH 43.00 10,000.00 1 7,350.00
2 6,800.00
3 6,300.00
4 10,000.00
5 8,600.00
EACH 4.00 7,500.00 1 7,350.00
2 7,150.00
3 6,600.00
4 7,100.00
5 7,200.00
6029-6001 RADAR VEHICLE SENSING DEVICE
6057-6001 RADAR ADVANCED DETECTION DEVICE
6016-6011 ITS MULTI-DUCT CND (PVC-80)(BORE)
6016-6013 ITS MULTI-DUCT CND (RMC)
6016-6015 FIBER OPTIC CABLE ROAD MARKER
6016-9001 ITS MULTI-DUCT CND (PVC-40)(STL
ENCSE)
6025-6001 RADAR PRESENCE DETECTOR
6016-6010 ITS MULTI-DUCT CND (PVC-80)
Date Prepared: 11/10/2017 Page: 58 of 61
County: Let Date:
Type: Bid No:
Time: Project ID:
Highway: Contract #:
Length: CCSJ:
From: To:
Estimate $ 168,951,004.96
Bidder 1 $ 202,548,591.57
Bidder 2 $ 233,445,739.29
Bidder 3 $ 252,286,943.96
Bidder 4 $ 279,428,828.61
Bidder 5 $ 289,374,971.13
Item CodeUnit Quantity Unit Est. Bidder Unit Bid
Exibit 2. Tabulation of Bids for HCRMA BID #2017-002 for the 365 Toll Project
Contract No. 0921-02-368
11/10/2017
HCRMA #2017-002365 TOLL (SEGS. 1 & 2)
0921-02-368
0921-02-368
71%
Description
Johnson Bros Corp., a Southland Company
Anderson Columbia Company, Inc.
Pulice
Webber, LLC
% Over/Under
20%
38%
49%
Company
1264 CALENDAR DAYS
HIDALGO
0.07 mi north of US 281 (Military Highway)
Lane-Abrams Toll 365 Joint Venture
CONTROLLED ACCESS TOLL FACILITY
0.58 mi west of FM 396 (Anzalduas Hwy)
12.22
365TOLL
65%
EACH 1.00 3,600.00 1 4,000.00
2 3,700.00
3 3,400.00
4 3,000.00
5 3,900.00
EACH 3.00 3,400.00 1 2,900.00
2 2,650.00
3 2,400.00
4 3,000.00
5 4,200.00
EACH 25.00 7,000.00 1 6,450.00
2 6,200.00
3 4,500.00
4 5,000.00
5 8,500.00
EACH 21.00 12,000.00 1 15,400.00
2 14,300.00
3 12,000.00
4 10,000.00
5 10,500.00
EACH 69.00 7,000.00 1 6,440.00
2 6,000.00
3 4,300.00
4 10,000.00
5 7,900.00
LINEAR FOOT 24.00 140.00 1 50.00
2 117.00
3 350.00
4 112.00
5 125.00
EACH 238.00 4,200.00 1 1,455.00
2 1,350.00
3 1,200.00
4 4,000.00
5 5,500.00
EACH 165.00 6,000.00 1 2,800.00
2 2,600.00
3 2,400.00
4 5,000.00
5 6,800.00
6064-6048 ITS POLE (55 FT)(130 MPH)
6064-6084 ITS POLE MNT CAB (TY 2)(CONF 2)
6120-6001 DEAD END ROADWAY BARRICADE
6186-6006 ITS GND BOX(PCAST) TY 1
(243660)W/APRN
6186-6012 ITS GND BOX(PCAST) TY 2
(366060)W/APRN
6062-6005 ITS RADIO (SNGL)(900 MHZ)-C-O
6062-6006 ITS RADIO (SNGL)(900 MHZ)-C-U
6064-6003 ITS POLE (20 FT)(130 MPH)
Date Prepared: 11/10/2017 Page: 59 of 61
County: Let Date:
Type: Bid No:
Time: Project ID:
Highway: Contract #:
Length: CCSJ:
From: To:
Estimate $ 168,951,004.96
Bidder 1 $ 202,548,591.57
Bidder 2 $ 233,445,739.29
Bidder 3 $ 252,286,943.96
Bidder 4 $ 279,428,828.61
Bidder 5 $ 289,374,971.13
Item CodeUnit Quantity Unit Est. Bidder Unit Bid
Exibit 2. Tabulation of Bids for HCRMA BID #2017-002 for the 365 Toll Project
Contract No. 0921-02-368
11/10/2017
HCRMA #2017-002365 TOLL (SEGS. 1 & 2)
0921-02-368
0921-02-368
71%
Description
Johnson Bros Corp., a Southland Company
Anderson Columbia Company, Inc.
Pulice
Webber, LLC
% Over/Under
20%
38%
49%
Company
1264 CALENDAR DAYS
HIDALGO
0.07 mi north of US 281 (Military Highway)
Lane-Abrams Toll 365 Joint Venture
CONTROLLED ACCESS TOLL FACILITY
0.58 mi west of FM 396 (Anzalduas Hwy)
12.22
365TOLL
65%
LUMP SUM 2.00 150,000.00 1 300,000.00
2 330,000.00
3 250,000.00
4 326,000.00
5 650,000.00
CUBIC YARD 30,890.00 3.75 1 4.00
2 3.20
3 2.75
4 4.90
5 17.60
CUBIC YARD 600,908.00 4.50 1 4.25
2 7.60
3 8.00
4 12.00
5 12.00
CUBIC YARD 24,815.00 0.50 1 6.00
2 9.70
3 6.00
4 5.95
5 13.40
EACH 3.00 2,000.00 1 108,000.00
2 46,000.00
3 100,000.00
4 38,000.00
5 101,500.00
EACH 2.00 2,000.00 1 27,000.00
2 43,500.00
3 25,000.00
4 5,300.00
5 25,380.00
EACH 2.00 1,500.00 1 950.00
2 5,100.00
3 3,500.00
4 1,500.00
5 6,600.00
LUMP SUM 1.00 135,000.00 1 269,000.00
2 245,000.00
3 230,000.00
4 150,000.00
5 250,000.00
HCRMA
6068-09-
01
SLUICE GATE
HCRMA
9079-90-
01
VEHICULAR GATE
HCRMA-
ITS-01-1
TRAFF MGT CENTER ELECTRONICS &
SOFTWARE
7031-9001 BY-PASS PUMPING (IRRIGATION CANAL)
HCRMA
3541-01-
01
EXCAVATION
HCRMA
3541-01-
02
COMPACTED FILL
HCRMA
3541-01-
03
TOP SOIL
HCRMA
6065-08-
01
GATEWELL STRUCTURE
Date Prepared: 11/10/2017 Page: 60 of 61
County: Let Date:
Type: Bid No:
Time: Project ID:
Highway: Contract #:
Length: CCSJ:
From: To:
Estimate $ 168,951,004.96
Bidder 1 $ 202,548,591.57
Bidder 2 $ 233,445,739.29
Bidder 3 $ 252,286,943.96
Bidder 4 $ 279,428,828.61
Bidder 5 $ 289,374,971.13
Item CodeUnit Quantity Unit Est. Bidder Unit Bid
Exibit 2. Tabulation of Bids for HCRMA BID #2017-002 for the 365 Toll Project
Contract No. 0921-02-368
11/10/2017
HCRMA #2017-002365 TOLL (SEGS. 1 & 2)
0921-02-368
0921-02-368
71%
Description
Johnson Bros Corp., a Southland Company
Anderson Columbia Company, Inc.
Pulice
Webber, LLC
% Over/Under
20%
38%
49%
Company
1264 CALENDAR DAYS
HIDALGO
0.07 mi north of US 281 (Military Highway)
Lane-Abrams Toll 365 Joint Venture
CONTROLLED ACCESS TOLL FACILITY
0.58 mi west of FM 396 (Anzalduas Hwy)
12.22
365TOLL
65%
EACH 20.00 10,000.00 1 3,650.00
2 3,300.00
3 3,000.00
4 2,500.00
5 12,500.00
EACH 16.00 5,000.00 1 3,775.00
2 3,500.00
3 3,250.00
4 20,000.00
5 5,800.00
LUMP SUM 18.00 15,000.00 1 8,850.00
2 8,100.00
3 7,600.00
4 2,500.00
5 32,500.00
EACH 27.00 13,000.00 1 720.00
2 660.00
3 600.00
4 5,000.00
5 3,600.00
EACH 4.00 13,000.00 1 720.00
2 660.00
3 620.00
4 5,000.00
5 5,250.00
EACH 4.00 50,000.00 1 120,000.00
2 112,000.00
3 104,000.00
4 250,000.00
5 225,000.00
LUMP SUM 1.00 30,000.00 1 330,000.00
2 305,000.00
3 280,000.00
4 75,000.00
5 275,000.00
HCRMA-
ITS-03
LIGHTNING PROTECTION
HCRMA-
ITS-04-01
BLUETOOTH DETECTION SYSTEM (SINGLE
LANE)
HCRMA-
ITS-04-02
BLUETOOTH DETECTION SYSTEM
(MULTIPLE LANES)
HCRMA-
ITS-05-1
LED DYNAMIC MESSAGE SIGN FULL
MATRIX FIELD EQUIP
HCRMA-
ITS-07-1
ITS SYSTEM INTEGRATION
HCRMA-
ITS-02-1
CCTV ITS POLE FIELD EQUIPMENT
(DIGITAL)
HCRMA-
ITS-02-2
CCTV DOME TRAFFIC SIGNAL POLE FIELD
EQUIP (DIGITAL)
Date Prepared: 11/10/2017 Page: 61 of 61