Exhibit C Energy and Water Audit Report Tool Set
Post (city):
Country:
Project Number:
Audit Level:
Submittal Date:
Consultant:
Project Information 4.2 Exhibit C Life Cycle Cost Analysis Audit Tool Page 1
Life Cycle Cost Analysis (LCCA) Tool - INSTRUCTIONS
This MS Excel output tool template is a companion to the Energy and Water Audit Report Template and shall be
completed as an electronic file with each submittal. Please request a meeting with the ESD team prior to
implementation of this tool for a walk though of the tool and it's functionality.
Input cells are light orange .
Cells with formulas have been locked to prevent user error, but may be unlocked by unprotecting each sheet
(there is no password; simply click 'unprotect sheet').
If printing this workbook, please select black and white.
ECM/WCM/REM output tables (blue tabs) and LCCA Tool (green tab)
The LCCA tool allows the team to assess the financial and environmental impact of combinations of ECMs,
WCMs, and REMs.
Do not modify the column headings or formulas. Certain cells are locked, but not password-protected, as noted
above. Other instructions are noted on the Tool worksheet.
1. Compile cost, utility, and environmental data for each proposed measure using other tools, and then enter the
summary in the light orange cells in the main table. Consider all life cycle costs, including shipping and
installation.
2. Identify the strategy category for each ECM, WCM, or REM (e.g. Lighting, HVAC,or Renewable Energy).
3. The tool will automatically calculate the NPV and payback for each conservation measure.
4. Categorize each ECM, WCM, or REM as no-/low-cost or longer-term.
5. For each summary output table tab (blue tabs: ECM Summary, WCM Summary, and REM Summary), select
the strategy categories that should be included in the overall evaluation. These are pre-populated based on
expected filtering requirements; use the drop-down orange cells to add additional categories. The strategy
categories included are pulled directly from the LCCA table.
6. The measures included in the LCCA table will be automatically filtered into the output tables (blue tabs) based
on categorization within the LCCA table and selection of categories in each summary output table, as outlined
above.
7. Copy the filtered summary tables (Recommended ECM/WCM/REM Lists and ECM/WCM/REM Summary
(blue tabs)) into the Report where noted in the Template. Note that the LCCA Tool screen is too large to print
legibly. Include only the Output Tables in the Report, and provide a copy of the editable electronic spreadsheet to
OBO.
Instructions 4.2 Exhibit C Life Cycle Cost Analysis Audit Tool Page 2
Output Tool Table of Contents(click name to go to tab)
Tab # Tab Name
1 Project Information
2 Instructions
3 Table of Contents (TOC)
4 LCCA Tool
10 Recommended Energy Conservation Measure (ECM) List
11 ECM Summary
12 Recommended Water Conseravation Measure (WCM) List
13 WCM Summary
14 Recommended Renewable Energy Measure (REM) List
15 REM Summary
16 DOS Approved Measures List
TOC 4.2 Exhibit C Life Cycle Cost Analysis Audit Tool Page 3
Life Cycle Cost Assessment (LCCA) Tool Go to Table of Contents
Template developed by: Paladino and Company, 2014
LCCA
ASSUMPTIONS
Electricity Use (MWh)
Natural Gas/Other
Use (MWh)
Water Use (kL)
TOTAL PROJECT
AREA
FIRST COST
Low-and no-cost 1,252,323$ 235,369$ NA 610,785 19,488 29,519 66,424$ 19,488$ 20,528$ 6,477$ 112,917$ 11 10 19,902,865$
Medium-cost 1,316,039$ 236,291$ NA 465,978 24,631 30,372 95,865$ 24,631$ 21,120$ 6,480$ 148,096$ 9 8 26,534,410$
High-cost 11,299,067$ 2,894,256$ NA 2,671,013 24,631 30,372 237,145$ 24,631$ 21,120$ 60,915$ 343,811$ 33 21 47,043,803$
Rec. Measure 2,631,943$ 355,658$ NA 1,320,108 8,999 30,372 118,468$ 8,999$ 21,120$ 60,922$ 209,509$ 13 10
DOS Approved 832,426$ 160,514$ NA 452,552 - 217 25,796$ -$ 150$ 7$ 25,953$ 32 21Click to change ---> Renewable Energy 9,790,970$ 2,610,757$ NA 1,689,110 - - 111,196$ -$ -$ 10$ 372,214$ 26 41 4,996,173$
Totals 12,287,791$ 3,053,566$ 3,151,058$ 24,631$ 30,372$ 265,541$ 24,631$ 21,120$ 60,922$ 372,214$ 33 21 51,149,505$
FIRST COST
Y Lighting Y y LED Site Lighting Select 43,222$ -$ 0 26050 0 - 1,485$ -$ -$ 7$ 1,492$ 29 19 243,779$
Y Lighting Y y LED Lighting (122/270 V) Select 412,605$ 57,608$ 17 324100 0 - 18,474$ -$ -$ -$ 18,474$ 22 16 3,012,106$
Y Lighting Y Daylighting Control Select -$ -$ - 43400 0 - 2,474$ -$ -$ -$ 2,474$ IMMEDIATE IMMEDIATE 475,899$
Y Y HVAC Y y Chillers: 3x high efficiency air cooled Select 370,253$ 101,702$ 25 85400 0 - 4,868$ 0 0 0 4,868$ 76 38 325,999$
Y HVAC Y Active Chilled Beam with 4 ACH Select 380,908$ -$ 0 165000 0 - 12,375$ 0 0 51435 63,810$ 6 6 11,893,593$
Y Y Y Renewable Energy Y Solar Pool Heating Select 52,162$ 14,328$ 25 46304 0 - 3,473$ 0 0 0 3,473$ 15 12 582,071$
Y Y Renewable Energy Y PV Ready roofs on SPX, UTX, NOB and Select 10$ 10$ 0 0 0 0 10$ 0 0 10 20$ 1 IMMEDIATE 3,837$
Y Y Y Water Y Rainwater Capture Select 154,153$ -$ 50 - 0 3441 -$ 0 2393 250 2,643$ 58 29 354,255$
Y Y Y Water Y Efficient Interior Plumbing Select -$ -$ 25 - 0 3435 -$ 0 2389 0 2,389$ IMMEDIATE IMMEDIATE 459,548$
Y Y Lighting Y CEE Tier 3 Clothes Washing Machines Select 695$ 1,070$ 12 15546 0 802 886$ 0 557 0 1,443$ 0 IMMEDIATE 271,990$
Y Y Water Y y Efficient Pre-Rinse Spray Valves Select -$ -$ 12 - 0 51 -$ 0 35 0 35$ IMMEDIATE IMMEDIATE 6,733$
Y Y Y Water Y
Energy Star Multi-tank Commercial
Dishwasher Select 3,477$ 5,350$ 12 18989 0 373 1,082$ 0 260 0 1,342$ 3
3 230,216$
Y Y Y Water Y Energy Star Commercial Ice Machine Select 348$ 701$ 10 4107 0 50 234$ 0 35 0 269$ 1 2 47,391$
Y Y Y Process Loads Y y Efficient Combination Ovens Select 782$ 1,204$ 12 15095 0 166 860$ 0 115 0 975$ 1 IMMEDIATE 181,266$
Y Y Y Water Y Water Efficient Irrigation Select -$ -$ 50 - 0 22054 -$ 0 15336 0 15,336$ IMMEDIATE IMMEDIATE 2,950,035$
Y Other Y y Habitat & Public Amenity Creation Select -$ -$ 0 0 0 0 -$ 0 0 0 -$ - - -$
Y Y HVAC Y Chillers: Heat Recovery Chiller Select 52,162$ 14,328$ 25 129000 0 - 7,353$ 0 0 0 7,353$ 7 7 1,328,428$
Y HVAC N Solar Driven Desiccant Dehumidification Select 373,831$ 131,060$ 10 222000 0 - 12,654$ 0 0 0 12,654$ 30 27 1,311,328$
Y Y Renewable Energy Y Solar DHW, Staff Showers/Laundry Select 107,620$ 29,561$ 25 51290 0 - 2,924$ 0 0 0 2,924$ 37 26 385,036$
Y Y Renewable Energy Y y Solar DHW, MSGR Select 5,564$ -$ 50 1907 0 - 109$ 0 0 0 109$ 51 27 15,403$
Y Y Y Water and Wastewater Y Horizontal Flow Constructed Wetlands Select 198,322$ 54,476$ 25 14704 0 - 838$ 0 0 6220 7,058$ 28
18 1,030,717$
Y Renewable Energy N Solar Driven Desiccant Dehumidification Select 411,393$ 131,060$ 10 12654 0 0 12,654$ 0 0 0 12,654$ 33 28 1,273,764$
Y Renewable Energy Y Small Wind Turbine, 2 kW VAWT Select 28,702$ -$ 0 198 0 0 198$ 0 0 0 198$ 145 45 9,305$
Y Renewable Energy Y Small Wind Turbine, 4.5 kW VAWT Select 43,053$ -$ 0 41 0 0 41$ 0 0 0 41$ 1062
51 (35,255)$
Y Renewable Energy Y Small Wind Turbine, 4 kW VAWT Select 38,269$ -$ 0 244 0 0 244$ 0 0 0 244$ 157 46 8,721$
Renewable Energy Y Small Wind Turbine, 10 kW VAWT, 14 m Select 95,673$ -$ 0 653 0 0 653$ 0 0 0 653$ 147 45 29,893$
Y Renewable Energy Y Small Wind Turbine, 10 kW VAWT, 40 m Select 95,673$ -$ 0 905 0 0 905$ 0 0 0 905$ 106 39 78,435$
Y Renewable Energy Y Small Wind Turbine, 2 kW HAWT Select 22,961$ -$ 0 218 0 0 218$ 0 0 0 218$ 106 39 18,886$
Y Renewable Energy Y Microturbines & Cogeneration Select 10$ 10$ 0 0 0 0 10$ 0 0 0 10$ IMMEDIATE
IMMEDIATE 1,914$
Y HVAC Y Chillers: 3x Maglev water cooled chillers Select 224,799$ 61,749$ 25 326400 0 - 18,605$ 0 0 3000 21,605$ 10
9 3,785,329$
Y Y Renewable Energy Y Solar DHW, Chancery Select 22,256$ -$ 50 11037 0 - 629$ 0 0 0 629$ 35 21 98,739$
Y Renewable Energy N PV to make the chancery ZNE Select 8,867,625$ 2,435,788$ 25 1563660 0 - 89,129$ 0 0 0 89,129$ 99 43 2,525,424$
Y Y HVAC Y Adjust HVAC BAS/Set points/Sensors Select 43,598$ -$ 20 4698 1689 4,698$ 1689 6,387$ 7 6 1,185,006$
Wastewater
ASHRAE BASELINE
5,000,000
-
60,000
10,000 m2
STRATEGY CATEGORIES
Passive Design
Lighting
HVAC
Renewable Energy
Water
Schedule Changes
Plug Loads
Process Loads
Enter all assumptions and conservation measure data in the orange cells. The tool will calculate Net Present Value (NPV) and payback. Results are in
the grey cells, and output is generated in tables on separate tabs in this workbook.
Strategy CategoriesHig
h-c
ost
LCCA
Simple Payback
(Yrs)
Financial
Payback (Yrs) Net Present Value ($)
REPLACEMENT (O&M)
Water Cost ($/m3)
ANNUAL UTILITY SAVINGS
ANNUAL UTILITY SAVINGS
DOS Approved
First Cost ($) *Includes
material and labor
costs
Cost ($)
*Material and
Installation cost
Replacement
Every_?_
Number of years
Electricity Savings
(MWh)
Natural
Gas/Other
Savings (MWH)
Water Savings
(m3)
Electricity Cost
Savings ($)
Natural
Gas/Other Cost
Savings ($)
LCCA
Replacement
(O&M) Cost
Savings ($)
Total Savings
($)
Simple Payback
(Yrs)
Med
ium
-
cost
Low
-an
d n
o-
cost
1.5$
5.0$
1$
REPLACEMENT (O&M) ANNUAL UTILITY AND O&M COST SAVINGS
• No- and low-cost measures = measures that have very little to no first
cost associated with it and that post staff may implement easily
• Medium-cost measures = measures that require OBO funding and/or
permit
• High-cost measures = measures that may require alternative financing
such as an Energy Savings Performance Contract with support from ICASS
and OBO
• Recommended measures = All ECMs that the consultant performing the
analysis recommends be implemented.
• DOS approved measures = To be completed by the contracting officer
• Measures by end use = Individual end uses can be examined by clicking
on cell S33
Difficulty ANNUAL UTILITY AND O&M COST SAVINGS
Water Cost
Savings ($)
Rec. Measure Conservation Measures Notes
First Cost ($) *Includes
material and labor
costs
Cost ($)
*Material and
Installation cost
Replacement
Every_?_
Number of years
Water Cost
Savings ($)
Replacement
(O&M) Cost
Savings ($)
Total Savings ($)Electricity Savings
(MWh)
Natural
Gas/Other
Savings (MWh)
Water Savings
(m3)
Electricity Cost
Savings ($)
Natural
Gas/Other Cost
Savings ($)
Does this ECM require
shipping of
components?
OBO Default Project-Specific
3.00%
2.75%
50
-$
50
2.30%
Utility Escalation Rate 7.00%
3.00%
2.75%
2.30%
7.00%
Net Present Value ($)
Discount Rate
O & M Escalation Rate
Inflation Rate
Number of Years
UTILITY COST ASSUMPTIONS
Electricity Cost ($/MWH)
Natural Gas/Other Cost ($/MWH)
Other Fuel ($/unit)
Financial
Payback (Yrs)
-$20,000
-$10,000
$0
$10,000
$20,000
$30,000
$40,000
$50,000
$60,000
0 5 10 15 20 25 30 35 40 45 50
Tho
usa
nd
s
NPV and Payback
Low-and no-cost Medium-cost High-cost
Rec. Measure DOS Approved Renewable Energy
LCCA Tool 4.2 Exhibit C Life Cycle Cost Analysis Audit Tool Page 4
FIRST COST
Strategy CategoriesHig
h-c
ost
LCCA
Simple Payback
(Yrs)
Financial
Payback (Yrs) Net Present Value ($)
REPLACEMENT (O&M) ANNUAL UTILITY SAVINGS
DOS ApprovedMed
ium
-
cost
Low
-an
d n
o-
cost
Difficulty ANNUAL UTILITY AND O&M COST SAVINGS
Rec. Measure Conservation Measures Notes
First Cost ($) *Includes
material and labor
costs
Cost ($)
*Material and
Installation cost
Replacement
Every_?_
Number of years
Water Cost
Savings ($)
Replacement
(O&M) Cost
Savings ($)
Total Savings ($)Electricity Savings
(MWh)
Natural
Gas/Other
Savings (MWh)
Water Savings
(m3)
Electricity Cost
Savings ($)
Natural
Gas/Other Cost
Savings ($)
Does this ECM require
shipping of
components?
Y Y HVAC Y Perform HVAC System Balancing Select 58,520$ -$ 10 1850 1105 1,850$ 1105 0 0 2,955$ 20 14 509,904$
Y Y Y Schedule Changes N Adjust Temperature Set points Select 2,999$ -$ 0 32636 15632 0 32,636$ 15632 0 0 48,268$ 0 IMMEDIATE 9,281,841$
Y Y HVAC Y Install Motors with VFD Controllers Select 65,897$ 13,561$ 8 6859 2349 6,859$ 2349 0 0 9,208$ 7 7 1,613,184$
Y Y Y Process Loads Y Install Pool Covers Select 14,000$ -$ 0 0 3856 0 -$ 3856 0 0 3,856$ 4 4 727,741$
Y Y Process Loads Y Reduced Use of Desktop Printers/Copiers Select 96,250$ -$ 0 26114 0 0 26,114$ 0 0 0 26,114$ 4
4 4,927,043$
Select -$ - - -$
Y Select -$ - - -$
Y Select -$ - - -$
Y Select -$ - - -$
Y Select -$ - - -$
Y Select -$ - - -$
Y Select -$ - - -$
Y Select -$ - - -$
Y Select -$ - - -$
Y Select -$ - - -$
Y Select -$ - - -$
Y Select -$ - - -$
Y Select -$ - - -$
Y Select -$ - - -$
Y Select -$ - - -$
Y Select -$ - - -$
Y Select -$ - - -$
Y Select -$ - - -$
Y Select -$ - - -$
Y Select -$ - - -$
Y Select -$ - - -$
Y Select -$ - - -$
Y Select -$ - - -$
Y Select -$ - - -$
Y Select -$ - - -$
Y Select -$ - - -$
Y Select -$ - - -$
Y Select -$ - - -$
Y Select -$ - - -$
Y Select -$ - - -$
Y Select -$ - - -$
Y Select -$ - - -$
LCCA Tool 4.2 Exhibit C Life Cycle Cost Analysis Audit Tool Page 5
List of Recommended ECMsGo to LCCA Tool tab
Complete the tool before filtering the output on this tab.
Copy the information for each recommended no-/low-cost ECM into the table below. Go to Table of Contents
1,763,691$ 251,222$ 154$ 1,169,512$ 8,999$ 968$ 106,901$ 8,999$ 672$ 54,442$ 171,014$ 10 9 30,481,268$
FIRST COST
Y Lighting y LED Site Lighting 43,222$ -$ 0 26050 - 1,485$ 7$ 1,492$ 29 19 243,779$
Y Lighting y LED Lighting (122/270 V) 412,605$ 57,608$ 17 324100 - 18,474$ 18,474$ 22 16 3,012,106$
Y Lighting Daylighting Control -$ -$ - 43400 - 2,474$ 2,474$ IMMEDIATE IMMEDIATE 475,899$
Y Y HVAC y
Chillers: 3x high efficiency air
cooled chillers @ 33% Load 370,253$ 101,702$ 25 85400 - 4,868$ 4,868$ 76 38 325,999$
Y HVAC Active Chilled Beam with 4 ACH 380,908$ -$ 0 165000 - 12,375$ 51,435$ 63,810$ 6 6 11,893,593$
Y Y Lighting
CEE Tier 3 Clothes Washing
Machines 695$ 1,070$ 12 15546 802 886$ 557$ 1,443$ 0 IMMEDIATE 271,990$
Y Y Y Process Loads y Efficient Combination Ovens 782$ 1,204$ 12 15095 166 860$ 115$ 975$ 1 IMMEDIATE 181,266$
Y Y HVAC Chillers: Heat Recovery Chiller 52,162$ 14,328$ 25 129000 - 7,353$ 7,353$ 7 7 1,328,428$
Y HVAC
Chillers: 3x Maglev water cooled
chillers 224,799$ 61,749$ 25 326400 - 18,605$ 3,000$ 21,605$ 10 9 3,785,329$
Y Y HVAC
Adjust HVAC BAS/Set
points/Sensors 43,598$ -$ 20 4698 1689 4,698$ 1,689$ 6,387$ 7 6 1,185,006$
Y Y HVAC Perform HVAC System Balancing 58,520$ -$ 10 1850 1105 1,850$ 1,105$ 2,955$ 20 14 509,904$
Y Y HVAC Install Motors with VFD Controllers 65,897$ 13,561$ 8 6859 2349 6,859$ 2,349$ 9,208$ 7 7 1,613,184$
Y Y Y Process Loads Install Pool Covers 14,000$ -$ 0 3856 3,856$ 3,856$ 4 4 727,741$
Y Y Process Loads
Reduced Use of Desktop
Printers/Copiers 96,250$ -$ 0 26114 26,114$ 26,114$ 4 4 4,927,043$
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
DOS
Approved
ANNUAL UTILITY AND O&M COST SAVINGS LCCA
Low
-and n
o-c
ost
Mediu
m-c
ost
Hig
h-c
ost
Strategy Categories
Difficulty REPLACEMENT (O&M) ANNUAL UTILITY SAVINGS
Water Cost
Savings ($)
Conservation Measures Notes
First Cost ($)
*Includes
material and
labor costs
Cost ($)
*Material and
Installation cost
Replacement
Every_?_
Number of
years
Electricity
Savings (MWh)
Natural
Gas/Other
Savings (MWh)
Water Savings
(kL)
Electricity Cost
Savings ($)
Net Present
Value ($)
Natural
Gas/Other Cost
Savings ($)
Replacement
(O&M) Cost
Savings ($)
Total Savings ($)Simple Payback
(Yrs)
Financial
Payback (Yrs)
Recommended ECM List 4.2 Exhibit C Life Cycle Cost Analysis Audit Tool Page 6
Low-and no-cost Medium-cost
Net Annual Savings (US$) $80,407 $111,427
First Costs (US$) $843,861 $705,156
Simple Payback (yrs) 10 6
Financial Payback (yrs) 9 6
Net Present Value (NPV) (US$) $14,248,631 $20,352,402
ENERGY Total (MWh/yr) 546,169 341,829
FINANCIAL
(ENERGY ONLY)
ECM Summary 4.2 Exhibit C Life Cycle Cost Analysis Audit Tool Page 7
List of Recommended WCMsGo to LCCA Tool tab
Complete the tool before filtering the output on this tab.
Copy the information for each recommended no-/low-cost WCM into the table below. Go to Table of Contents
157,978$ 6,051$ 159$ 23,096$ -$ 29,404$ 1,316$ -$ 20,448$ 250$ 22,014$ 7 1 4,048,178$
FIRST COST
Y Y Y Water Rainwater Capture 154,153$ -$ 50 - 3441 2,393$ 250$ 2,643$ 58 29 354,255$
Y Y Y Water Efficient Interior Plumbing -$ -$ 25 - 3435 2,389$ 2,389$ IMMEDIATE IMMEDIATE 459,548$
Y Y Water y Efficient Pre-Rinse Spray Valves -$ -$ 12 - 51 35$ 35$ IMMEDIATE IMMEDIATE 6,733$
Y Y Y Water
Energy Star Multi-tank Commercial
Dishwasher 3,477$ 5,350$ 12 18989 373 1,082$ 260$ 1,342$ 3 3 230,216$
Y Y Y Water
Energy Star Commercial Ice
Machine 348$ 701$ 10 4107 50 234$ 35$ 269$ 1 2 47,391$
Y Y Y Water Water Efficient Irrigation -$ -$ 50 - 22054 15,336$ 15,336$ IMMEDIATE IMMEDIATE 2,950,035$
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
DOS
Approved
ANNUAL UTILITY AND O&M COST SAVINGS LCCA
Low
-an
d n
o-c
ost
Med
ium
-co
st
Hig
h-c
ost
Strategy Categories
Difficulty REPLACEMENT (O&M) ANNUAL UTILITY SAVINGS
Water Cost
Savings ($)
Conservation Measures Notes
First Cost ($)
*Includes
material and
labor costs
Cost ($)
*Material and
Installation cost
Replacement
Every_?_
Number of
years
Electricity
Savings (MWh)
Natural
Gas/Other
Savings (MWh)
Water Savings
(m3)
Electricity Cost
Savings ($)
Net Present
Value ($)
Natural
Gas/Other Cost
Savings ($)
Replacement
(O&M) Cost
Savings ($)
Total Savings ($)Simple Payback
(Yrs)
Financial
Payback (Yrs)
Recommended WCM List 4.2 Exhibit C Life Cycle Cost Analysis Audit Tool Page 8
Low-and no-cost Medium-cost
Net Annual Savings (US$) $21,979 $22,014
First Costs (US$) $157,978 $157,978
Simple Payback (yrs) 7 7
Financial Payback (yrs) 7 7
Net Present Value (NPV) (US$) $158,252,738 $158,253,175
WATER Total Savings (m3/yr) 29,353 29,404
FINANCIAL
(WATER ONLY)
WCM Summary 4.2 Exhibit C Life Cycle Cost Analysis Audit Tool Page 9
List of Recommended REMsGo to LCCA Tool tab
Complete the tool before filtering the output on this tab.
Copy the information for each recommended no-/low-cost REM into the table below. Go to Table of Contents
511,952$ 43,909$ 150$ 112,796$ -$ -$ 9,413$ -$ -$ 10$ 9,423$ 54 29 1,196,985$
FIRST COST
Y Y Y Renewable Energy Solar Pool Heating 52,162$ 14,328$ 25 46304 - 3,473$ 3,473$ 15 12 582,071$
Y Y Renewable Energy
PV Ready roofs on SPX, UTX, NOB
and MSGR. 10$ 10$ 0 10$ 10$ 20$ 1 IMMEDIATE 3,837$
Y Y Renewable Energy Solar DHW, Staff Showers/Laundry 107,620$ 29,561$ 25 51290 - 2,924$ 2,924$ 37 26 385,036$
Y Y Renewable Energy y Solar DHW, MSGR 5,564$ -$ 50 1907 - 109$ 109$ 51 27 15,403$
Y Renewable Energy Small Wind Turbine, 2 kW VAWT 28,702$ -$ 0 198 198$ 198$ 145 45 9,305$
Y Renewable Energy Small Wind Turbine, 4.5 kW VAWT 43,053$ -$ 0 41 41$ 41$ 1062 51 (35,255)$
Y Renewable Energy Small Wind Turbine, 4 kW VAWT 38,269$ -$ 0 244 244$ 244$ 157 46 8,721$
Renewable Energy
Small Wind Turbine, 10 kW VAWT,
14 m total height 95,673$ -$ 0 653 653$ 653$ 147 45 29,893$
Y Renewable Energy
Small Wind Turbine, 10 kW VAWT,
40 m tower 95,673$ -$ 0 905 905$ 905$ 106 39 78,435$
Y Renewable Energy Small Wind Turbine, 2 kW HAWT 22,961$ -$ 0 218 218$ 218$ 106 39 18,886$
Y Renewable Energy Microturbines & Cogeneration 10$ 10$ 0 10$ 10$ IMMEDIATE IMMEDIATE 1,914$
Y Y Renewable Energy Solar DHW, Chancery 22,256$ -$ 50 11037 - 629$ 629$ 35 21 98,739$
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
DOS Approved
ANNUAL UTILITY AND O&M COST SAVINGS LCCA
Low
-an
d n
o-c
ost
Med
ium
-co
st
Hig
h-c
ost
Strategy Categories
Difficulty REPLACEMENT (O&M) ANNUAL UTILITY SAVINGS
Water Cost
Savings ($)
Conservation Measures Notes
First Cost ($)
*Includes
material and
labor costs
Cost ($)
*Material and
Installation cost
Replacement
Every_?_
Number of
years
Electricity
Savings (MWh)
Natural
Gas/Other
Savings (MWh)
Water Savings
(kL)
Electricity Cost
Savings ($)
Net Present
Value ($)
Natural
Gas/Other Cost
Savings ($)
Replacement
(O&M) Cost
Savings ($)
Total Savings ($)Simple Payback
(Yrs)
Financial
Payback (Yrs)
Recommended REM List 4.2 Exhibit C Life Cycle Cost Analysis Audit Tool Page 10
Low-and no-cost Medium-cost
Net Annual Savings (US$) $80,407 $111,427
First Costs (US$) $843,861 $705,156
Simple Payback (yrs) 10 6
Financial Payback (yrs) 9 6
Net Present Value (NPV) (US$) $844,866,088 $706,548,838
RENEWABLE ENERGY Total Savings (m3/yr) 166 968
FINANCIAL
(RENEWABLES ONLY)
REM Summary 4.2 Exhibit C Life Cycle Cost Analysis Audit Tool Page 11
List of Recommended ECMsGo to LCCA Tool tab
Complete the tool before filtering the output on this tab.
Copy the information for each recommended no-/low-cost ECM into the table below. Go to Table of Contents
832,426$ 160,514$ 116$ 452,552$ -$ 217$ 25,796$ -$ 150$ 7$ 25,953$ 32 1
FIRST COST
Y Lighting Y y LED Site Lighting 43,222$ -$ 0 26050 - 1,485$ 7$ 1,492$ 29 19
Y Lighting Y y LED Lighting (122/270 V) 412,605$ 57,608$ 17 324100 - 18,474$ 18,474$ 22 16
Y Y HVAC Y y
Chillers: 3x high efficiency air
cooled chillers @ 33% Load 370,253$ 101,702$ 25 85400 - 4,868$ 4,868$ 76 38
Y Y Water Y y Efficient Pre-Rinse Spray Valves -$ -$ 12 - 51 35$ 35$ IMMEDIATE IMMEDIATE
Y Y Y Process Loads Y y Efficient Combination Ovens 782$ 1,204$ 12 15095 166 860$ 115$ 975$ 1 IMMEDIATE
Y Other Y y Habitat & Public Amenity Creation -$ -$ 0 - -
Y Y Renewable Energy Y y Solar DHW, MSGR 5,564$ -$ 50 1907 - 109$ 109$ 51 27
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
Electricity
Savings (MWh)
ANNUAL UTILITY AND O&M COST SAVINGS LCCA
Replacement
(O&M) Cost
Savings ($)
Total Savings ($)Simple Payback
(Yrs)
Financial
Payback (Yrs)
Water Cost
Savings ($)
Electricity Cost
Savings ($)
Natural
Gas/Other Cost
Savings ($)
Difficulty REPLACEMENT (O&M) ANNUAL UTILITY SAVINGS
Low
-and n
o-c
ost
Mediu
m-c
ost
Hig
h-c
ost
Strategy Categories
Recommende
d Measure? DOS Approved
Natural
Gas/Other
Savings (MWh)
Water Savings
(kL)
Conservation Measures Notes
First Cost ($)
*Includes
material and
labor costs
Cost ($)
*Material and
Installation cost
Replacement
Every_?_
Number of
years
DOS Approved Measures List 4.2 Exhibit C Life Cycle Cost Analysis Audit Tool Page 12
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
DOS Approved Measures List 4.2 Exhibit C Life Cycle Cost Analysis Audit Tool Page 13
3,785,286$
243,779$
3,012,106$
325,999$
6,733$
181,266$
15,403$
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
LCCA
Net Present
Value ($)
DOS Approved Measures List 4.2 Exhibit C Life Cycle Cost Analysis Audit Tool Page 14
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
DOS Approved Measures List 4.2 Exhibit C Life Cycle Cost Analysis Audit Tool Page 15