Exercise

Embed Size (px)

DESCRIPTION

latihan

Citation preview

Sheet9ribbontabgroupcommand

Sheet1FireDadWhat is your name4/11/15253/12/153/15/15WaterMomMy name is 5/13/1425.6EarthSister345267water

Sheet2Office Christmas Party1. Make a sample data as shown.2. Select one of the cells. Notice how the cell address appears in Name Box and its content appears in the Formula Box.EmployeeAttendingNot AttendingBringing Guest3. Use the Fill Handle to fill in data.4. Copy, cut and paste cell content.Peraza, BrianX5. Delete a cell.Swense, LizX6. Move the cell.Harris, JaneXLewty, AliceXOlvera, Emily K.XWodal, MatthewXMcMillan, J. E.XDees, RobertXWimblet, GraceSalter, Joe AnnOlds, HannahStrickler, TheodoreMerrill, Olivia

Sheet3HPAS North Carolina Board of Directors1. Make a sample data as shown.Ashberry, Jane78-A Meaddowview Lane [email protected]. Modify the size of column A to a bigger width.Davis, Garrett29 North Luke Court [email protected]. Modify the size of row 1 to 46.Eberhardt, Elizabeth63-C Chapel Court, [email protected]. Insert a column between column A and B.Everett, Carol123 Garden Plow Way [email protected]. Insert a row between row 3 and 4.Hepburn, Katie H.127 South Pejulup [email protected]. Delete the column and row you just inserted.Lovelace, Deb124 Heuristic Way [email protected]. Merge the cells of row 1.Manning, Christopher2380 New Cove Road [email protected]. Use text wrap for row 1 to row 11.McBride, Rebecca131 W Clinton Street [email protected], Daniel9 Atlantic Boulevard [email protected], Kevin2520 Hopkins Road [email protected]

Sheet4HPAS North Carolina Board of DirectorsAshberry, Jane78-A Meaddowview Lane [email protected], Garrett29 North Luke Court [email protected], Elizabeth63-C Chapel Court, [email protected], Carol123 Garden Plow Way [email protected], Katie H.127 South Pejulup [email protected], Deb124 Heuristic Way [email protected], Christopher2380 New Cove Road [email protected], Rebecca131 W Clinton Street [email protected], Daniel9 Atlantic Boulevard [email protected], Kevin2520 Hopkins Road [email protected]

Sheet5Fitness Progress ChartDateWeight(pounds)Chest (Inches)Waist (Inches)Hips (InchesForearm (Inches)Estimated Lean BodyEstimated Body FatEstimated Body Fat Percentage1/1/1014032314011.5103.836.225.91/10/10140323139.511.5103.936.125.81/20/10139323139.511.5103.235.825.810/30/1013831303911103.435.625.62/3/1013831303911103.435.625.61. Make a sample data as shown.2. Select cell A1 and change the font to Verdana, size to 16, and font colour to green. Merge the cells in row 1. 3. Select cell B3 and make the word "Weight" bold, italized and underlined.4. Add border to row 3.5. Add a fill colour to row 3.6. Try changing the vertical and horizontal text alignment for cells in row 3.7. Change the date format in column A.

Sheet6Fitness Progress ChartDateWeight(pounds)Chest (Inches)Waist (Inches)Hips (InchesForearm (Inches)Estimated Lean BodyEstimated Body FatEstimated Body Fat Percentage2010-01-0114032314011.5103.836.225.92010-01-10140323139.511.5103.936.125.82010-01-20139323139.511.5103.235.825.82010-10-3013831303911103.435.625.62010-02-0313831303911103.435.625.6

Sheet7Summer Remodeling Wish ListTaskPriorityCostBudget for June700Repair hardwoods upstairs185.00Budget for July550Add new vanity and tile in bathroom6263.00Total BudgetExpand bathroom7245.36New tile in kitchen3225.26Add recessed lighting to kitchen5208.901. Make a sample as shown.Add molding downstairs4120.362. Write a division formula in cell B17 to calcualte painting cost per square feet.Paint bedroom275.003. Write an addition formula in cell F5 to calcuate total budget.Total1222.884. Write a subtraction formula in cell C12 to substract the value in cell C6 from cell C11.5. Write a multiplication formula in cell B22 to calcuate total for hardwood floor repair.Estimated Painitng Cost Per Squre FootTotal cost75Square feet250Total/Sq ftHardwood Floor RepairHoursRate per hour3.425Total

Sheet8Summer Remodeling Wish ListTaskPriorityCostBudget for June700Repair hardwoods upstairs185.00Budget for July550Add new vanity and tile in bathroom6263.00Total Budget1250Expand bathroom7245.36New tile in kitchen3225.26Add recessed lighting to kitchen5208.90Add molding downstairs4120.36Paint bedroom275.00Total1222.88977.52Estimated Painitng Cost Per Squre FootTotal cost75Square feet250Total/Sq ft0.3Hardwood Floor RepairHoursRate3.425Total85