Oct-18
Central Electricity Authority
Executive Summary on Power Sector
Government of India
विदयत मतरालयMinistry of Power
कनदरीय विदयत पराधिकरण
भारत सरकार
File NoCEA-CH-14-1142018-Coordination Division
SN Section A - Highlights of Power Sector Page
1 Electricity Generation for Oct-2018 (BU) 1A amp 1B
2 Generating Capacity Addition for Oct-2018 (MW) 2
3 List of Projects Commissioned in Oct-2018 3
4 All India Installed Capacity (MW) Region-wise as on 31-10-18 3
5 All India Installed Capacity (MW) Sector-wise as on 31-10-18 4
6 Transmission Lines Added during Oct-2018 (Ckms) 5
7 Transformation Capacity Addition during Oct-2018 (MVA) 6
8 Power Supply Position (Energy amp Peak) in Oct-2018 7
9 Peak Shortage of Power Supply (MW) in Different Regions 8-9
10 All India PLF Sector-wise for Oct-2018 10
11 T amp D and AT amp C Losses ()
12 All India Village Electrification
13 Average cost of Power amp Average Realisation
14 All India Coal consumption for Power Generation (MT)
1 Capacity Addition Targets and Achievements in 12th Plan 12
2 Capacity Addition Targets amp Achievements during Oct-2018 13
3 Installed Capacity in various Regions including their shares 14-19
1 Programme and Achievements of Transmission Lines in Oct-2018
2 List of Transmission Lines CommissionedReady for commissioning during Oct-2018
1 Programme and Achievements of Sub-Stations in Oct-2018
2 List of Sub Stations commissionedready for commisssioning in Oct-2018
1 Electricity Generation (MU) Targets and Achievements for 2018-19 22
1 Power Supply Position (Provisional) for Oct-2018 23
2 Peak Demand and Peak Met (Provisional) for Oct-2018 24
3 Power Supply Position (Revised) for Sep-2018 25
4 Peak Demand and Peak Met (Revised) for Sep-2018 26
5 Notified Power cuts Restrictions on Industries during Oct-2018 27
6 Power Supply to Agricultural Sector during Oct-2018 28
1 Growth of Installed Capacity since 6th Plan 29
2 Growth of Transmission Sector since 6th Plan 30
3 All India Yearly Coal consumption for Power Generation (Utilities)
4 All India Annual Per Capita Consumption of Electricity since 2006
5 Average cost of power supply amp Average realisation (Paisakwh)
6 Growth of Rural Electrification amp Pump Sets Energisation
7 Status of Hydro Schemes Cleared by the CEA in Oct-2018
1 Rate of sale of power for the year 2016-17 33-41
Section H - Rate of sale of power for the year 2016-17
Executive Summary for the Month of Oct-2018
32
11
20
21
31
Section B - Capacity Addition
Section C - Transmission Lines
Section D - Sub Stations
Section E - Electricity Generation
Section F - Power supply position
Contents
Section G - Growth of Power Sector
File NoCEA-CH-14-1142018-Coordination Division
SN Contents Page
1Electricity Generation (Conventional Sources) for Oct-2018 (BU) 1
2 Generating Capacity Addition for Oct-2018 (MW) 2
3 List of Projects Commissioned in Oct-2018 3
4 All India Installed Capacity (MW) Region-wise as on 31-10-18 3
5 All India Installed Capacity (MW) Sector-wise as on 31-10-18 4
6 Transmission Lines Added during Oct-2018 (Ckms) 5
7 Transformation Capacity Addition during Oct-2018 (MVA) 6
8 Power Supply Position (Energy amp Peak) in Oct-2018 7
9 Peak Shortage of Power Supply (MW) in Different Regions 8-9
10 All India PLF Sector-wise for Oct-2018 10
11 T amp D and AT amp C Losses ()
12 All India Village Electrification
13 Average cost of Power amp Average Realisation
14 All India Coal consumption for Power Generation (MT)
Section A - Highlights of Power Sector
11
File NoCEA-CH-14-1142018-Coordination Division
Achievement
Oct-18
Thermal 9736 1067
Nuclear 303 -288
Hydro 1262 1287
Bhutan Import 0353 -4146
All India 113364 1019
Type
Thermal
Nuclear
Hydro
Bhutan Import
All India
1A
96003
41664409
9182018
3719257
-551
Change wrt April 2017- Oct
2017
Electricity Generation During April 2017- Oct 2017 amp April 2018- Oct 2018 (BU)
April 2017- Oct 2017 April 2018- Oct 2018
312
10722
49174917171413
102878
0633
62697
22035
502
8797
59698
1 Electricity Generation for Oct-2018 (BU)
Oct-18Type
Achievement
Oct-17
Targets Change
wrt 2017
9443
0603
3533
109320
1118
102878
113364
96000
98000
100000
102000
104000
106000
108000
110000
112000
114000
116000
BU
Oct-17 Oct-18
71413749171
000
10000
20000
30000
40000
50000
60000
70000
80000
BU
April 2017- Oct 2017 April 2018- Oct 2018
File NoCEA-CH-14-1142018-Coordination Division
Generation from
Conventional
Sources
Generation
from
Renewable
Sources
Total Generation from
Conventional Sources
Generation from
Renewable SourcesTotal
Growth in
Conventional
Generation
Growth in
Renewable
Generation
Growth in
Total
Generation
(BU) (BU) (BU) (BU) (BU) (BU) () () ()
113366 8500 121866 102879 6537 109416 1019 3003 1138
Note Tentative
SlNo
Source-Wise All
India
Generation
from
Renewables
Sep-2018 Sep-2017 April 2018- Sept 2018 April 2017- Sept 2017
1 Wind 6093345 3897076 45331034 37069611
2 Solar 3209923 2002513 17912711 10811454
3 Biomass 177174 273211 1382764 1741918
4 Bagasse 231358 270424 3154629 2085272
5 Small Hydro 993983 1021349 5335933 4727041
6 Others 32159 24319 209731 173991
Total 10737943 7488892 73326802 56609286
Note 1) All figures are provisional
2) Data as received from SLDC of the respective states or from the electricity department
Electricity Generation (Conventional and Renewable Sources)
Oct-2018 Oct-2017 Growth
1B
For the Month of Cummulative for the period
All India Generation From Renewables (All Figures are in MU)
File NoCEA-CH-14-1142018-Coordination Division
Achievement Targets Achievement
Oct-17
Thermal 0 1280 600 NA
Hydro 30 0 0 000
Nuclear 0 0 0 NA
All India 30 1280 600 200000
April 2017- Oct 2017 April 2018- Oct 2018 Change
Thermal 4300 670 -84
Hydro 308 140 -55
Nuclear 0 0 NA
All India 4608 810 -82
Note Lakwa Replacement Power Project (69755 MW) had achieved COD on 260418 but
the intimation regarding COD was received in Oct18 (Additional Capacity addition)
2
2 Generating Capacity Addition for Oct-2018 (MW)
Generating Capacity Addition during April 2017- Oct 2017 amp April 2018- Oct 2018
NA- Not Applicable
Change wrt
Oct-2017Type
Oct-18
300
6000
0
100
200
300
400
500
600
700
1Oct-17 Oct-18
0
500
1000
1500
2000
2500
3000
3500
4000
4500
5000
April 2017- Oct 2017 April 2018- Oct 2018
File NoCEA-CH-14-1142018-Coordination Division
(i)
(ii)
(iii)
Nuclear Hydro RES Grand TotalRegion Coal Gas Diesel Total
Northern 5128020 578126 000 5706146 162000 1970777 1363391 9202314
Western 7120862 1080649 000 8201511 184000 754750 2102418 11242679
Southern 4578202 647366 76158 5301726 332000 1183803 3597107 10414636
Eastern 2720164 10000 000 2730164 000 494212 108364 3332740
North-East 52002 177581 3600 233183 000 145200 28745 407128
Islands 000 000 4005 4005 000 000 1256 5261
ALL INDIA 19599250 2493722 83763 22176734 678000 4548742 7201281 34604757
Note Captive Genaration is not included in the total Captive Power capacity as on 31032017 RES as on 30092018 3
Thermal
Nuclear
3 List of Projects Commissioned During Oct-2018
4 All India Installed Capacity (MW) Region-wise as on 31-10-18
Mahan TPP of Essar Power MP ltd of capacity 600 MW was commissioned on 07102018
NIL
Thermal
NIL
Hydro
22176734
678000
4548742
7201281
34604757
51529
000
5000000
10000000
15000000
20000000
25000000
30000000
35000000
40000000
Thermal Nuclear Hydro RES Total Captive
Thermal Nuclear Hydro RES Total Captive
Total = 34604757
File NoCEA-CH-14-1142018-Coordination Division
Sector
Coal Gas Diesel Total
State 6359650 711871 36393 7107913 000 2994200 200887 10303000
Private 7614600 1058060 47370 8720030 000 339400 6850164 15909594
Central 5625000 723791 000 6348791 678000 1215142 150230 8392163
All India 19599250 2493722 83763 22176734 678000 4548742 7201281 34604757
State 10303000
Private 15909594
Central 8392163
Electricity Generation (MU) Targets and Achievements for 2016-17
5 All India Installed Capacity (MW) Sector-wise as on 31-10-18
4
Grand TotalTHERMAL
Nuclear Hydro RES
RES as on 30092018
State 10303000 30
Private 15909594 46
Central 8392163 24
All India Installed Capacity(MW) as on 31-10-2018 (Sector-Wise)
File NoCEA-CH-14-1142018-Coordination Division
Voltage Level
+- 500 KV HVDC
+- 800 KV HVDC
765 KV
400 KV
220 KV
All India
Voltage Level
+- 500 KV HVDC
+- 800 KV HVDC
765 KV
400 kV
220 KV
All India
5
0 0
6 Transmission Lines Added during Oct-2018 (Ckms)
Oct-17 Oct-18
0 0
0 0
0 729
245 737
324 401
569 1867
Transmission Lines Added duringApril 2017- Oct 2017 ampApril 2018- Oct 2018 (Ckms)
April 2017- Oct 2017 April 2018- Oct 2018
2151 4521
13120 11799
0 0
2046 2464
8923 4814
569
1867
0
500
1000
1500
2000
All India
Ckm
s
Oct-17 Oct-18
13120
11799
11000
11500
12000
12500
13000
13500
All India
Ckm
s
April 2017- Oct 2017 April 2018- Oct 2018
File NoCEA-CH-14-1142018-Coordination Division
Voltage Level
+- 800 KV HVDC
+- 500 KV HVDC
765 KV
400 KV
220 KV
All India
Voltage Level
+- 800 KV HVDC
+- 500 KV HVDC
765 KV
400 KV
220 KV
All India
6
7 Transformation Capacity Addition During Oct-2018 (MVA)
0
0
2575
1025
0 0
Oct-17 Oct-18
3600
0
3000
9840
4620
2220
3000 0
All India Transformation Capacity Addition during April 2017- Oct 2017 amp April
2018- Oct 2018 (MVA)
41790
0
14000
17180
10610
45665
10000
23020
9645
0
April 2017- Oct 2017 April 2018- Oct 2018
3600
9840
0
2000
4000
6000
8000
10000
12000
MV
A
Oct-17 Oct-18
4566541790
0
74520
1
MV
A
April 2017- Oct 2017 April 2018- Oct 2018
File NoCEA-CH-14-1142018-Coordination Division
Oct-2017 Oct-2018 Oct-2017 Oct-2018 Oct-2017 Oct-2018
Northern 31786 31822 31096 31375 -22 -14
Western 31728 36308 31628 36178 -03 -04
Southern 24314 29392 24271 29342 -02 -02
Eastern 12012 12547 11931 12507 -07 -03
North Eastern 1487 1387 1451 1351 -24 -25
All India 101327 111455 100377 110753 -09 -06
Oct-2017 Oct-2018 Oct-2017 Oct-2018 Oct-2017 Oct-2018
Northern 51307 50659 50289 49635 -20 -20
Western 48530 56548 46392 55695 -44 -15
Southern 39142 45279 38905 45226 -06 -01
Eastern 19850 22959 19836 22567 -01 -17
North Eastern 2596 2790 2499 2700 -37 -32
All India 162027 172945 157394 170604 -29 -14
Oct-2018 Figures are Provisional
7
8 Power Supply Position (Energy amp Peak) in Oct-2018
Peak Demand Peak Met
Requirement Availability
Energy (MU)Region
Surplus(+)
Deficit (-) in
Surplus(+)
Deficit (-) in Region
Power (MW)
File NoCEA-CH-14-1142018-Coordination Division
Chandigarh Delhi Haryana HP JampK Punjab Rajasthan UP Utrakhand Oct-2017 0 0 0 0 516 0 0 0 0
Oct-2018 0 0 0 0 567 0 0 688 0
Chattisgarh Gujarat MP Maharastra Daman amp Diu Dadar Nagar Goa
Oct-2017 16 0 13 2062 0 0 25
Oct-2018 146 19 39 705 1 4 0
AP Telangana Karnataka Kerala Tamil Nadu Puducherry Lakshadweep
Oct-2017 18 19 0 211 38 2 0
Oct-2018 0 0 0 83 414 1 0
8
9 Peak Shortage of Power Supply (MW) in Different Regions in Oct-2018
0 0 0 0
567
0 0
688
00 0 0 0
516
0 0 0 0
0
400
800
Chan
dig
ar
h
Delh
i
Hary
ana
HP
Jamp
K
Pu
nj
ab
Raja
sth
an
UP
Utr
ak
hand
MW
Northern States (MW) Oct-2018 Oct-2017
146
19
39 705
1 4 016
0 13
2062
0 0 25
0
5000
Ch
attis
garh
Guja
rat
MP
Mah
ara
st
ra
Da
man amp
Diu
Da
dar
Na
gar G
oaM
W
Western States (MW) Oct-2018 Oct-2017
0 0 083
414
1 018 19 0
211
38 2 00
500
AP Telangana Karnataka Kerala Tamil Nadu Puducherry Lakshadweep
Southern State (MW) Oct-2018 Oct-2017
File NoCEA-CH-14-1142018-Coordination Division
Bihar DVC Jharkhand Odisha West Bengal Sikkim AampN Island
Oct-2017 6 0 0 0 8 0 4
Oct-2018 0 0 0 400 0 0 4
Arunachal Assam Manipur Meghalaya Mizoram Nagaland Tripura
Oct-2017 6 77 4 0 2 2 12
Oct-2018 13 81 2 0 2 3 0
9
0 0 0
400
0 0 46 0 0 0 8 0 4
0100200300400500
Bih
ar
DV
C
Jha
rkh
an
d
Od
ish
a
We
st
Be
ng
al
Sik
kim
Aamp
NIs
land
MW
Eastern States (MW) Oct-2018 Oct-2017
13
81
2 0 2 3 06 4 0 2 2
12
0
100
Aru
na
ch
al
Assa
m
Ma
nip
ur
Meghal
aya
Miz
ora
m
Na
gala
nd
Trip
ura
MW
North-Eastern States (MW)
File NoCEA-CH-14-1142018-Coordination Division
Sector Oct-2017 Oct-2018
Central 6872 7355
State 5217 6078
Private 6045 6819
ALL INDIA 5882 6524
Month PLF 2017 PLF 2018
Jan 6014 6288
Feb 6153 6285
March 6313 6558
April 6493 6458
May 6355 6554
June 5672 5917
July 537 5545
Aug 5733 5639
Sep 5989 6109
Oct 5882 6524
For Coal and Lignite based Power Plants and Provisional based on Actual-Cum-Assesment
10
PLF of Thermal Power Plants
All India PLF of Thermal Plants (Excluding Gas Based Plants) Month-wise
10 All India PLF Sector-wise for Oct-2018
68
72
52
17
60
45
58
8273
55
60
78
68
19
65
24
000
1000
2000
3000
4000
5000
6000
7000
8000
Central State Private ALL INDIA
P
LF
Oct-2017 Oct-2018
0
10
20
30
40
50
60
70
Jan Feb March April May June July Aug Sep Oct
Months
All India PLF Month-wise
PLF 2017 PLF 2018
File NoCEA-CH-14-1142018-Coordination Division
2012-13 2013-14 2014-15 2015-16 2016-17
TampD Losses 2304 2284 2277 2181 2142
ATampC Losses 2548 2258 2462
Note As per PFC for utilities selling directly to consumers
Total Number of Villages
597464
Note From the year 2004-05 onwards Definition of Village Electrification-
A village would be declared Electrified if
Without
Subsidy
Gap ACS-
ARR(
Without
Subsidy)
Paiseunit
Gap ACS-
ARR (on
subsidy
booked
basis)
paiseunit
Gap ACS-
ARR (on
subsidyrece
ived basis)
paiseunit
2013-14 400 118 76 77
2014-15 412 108 58 60
Source- PFC Reports on the performance of State Power Utilities
2013-14 4894
2014-15 5304
2015-16 5459
2016-17 5743
2017-18 6080
11
Average cost of supply(ACS)
(paiseunit)
i) Basic Infrastructure such as Distribution Transformer and Distribution lines are provided in the inhabited locality
as well as Dalit Basti hemlet where it exists (For electrification through Non-Conventional Energy Sources a
Distribution Transformer may not be necessary)
14 All India Coal consumption for Power Generation (MT)
520
Average Revenue Realization(paiseunit)
518
Year
ii) Electricity is provided to Public places like Schools Panchayat Office Health Centre Dispensaries Community
Centres etc and
iv) Mandatory Certification from Gram Panchayat regarding the completion of village electrification should be
obtained
13 Average cost of Power amp Average Realisation
iii) The number of households electrified should be at least 10 of the total number of households in the village
11 T amp D and ATampC Losses ()
12 All India Village Electrification
Villiages Electrified (Nos)
10000All villages as per census 2011 has
been electrified on 28042018
Villages electrified
File NoCEA-CH-14-1142018-Coordination Division
SN Contents Page
1 Capacity Addition Targets and Achievements in 12th Plan 12
2 Capacity Addition Targets amp Achievements during Oct-2018 and April 2018- Oct 2018 13
3 Installed Capacity in various Regions including their shares 14-19
Section B - Capacity Addition
File NoCEA-CH-14-1142018-Coordination Division
Figures in MW
TARGET ACH TARGET ACH TARGET ACH TARGET ACH
CENTRAL 14878 15869 6004 2584 5300 2000 26182 20453
STATE 13922 22201 1608 2276 0 0 15530 24477
PRIVATE 43540 53661 3285 619 0 0 46825 54280
ALL INDIA 72340 91730 10897 5479 5300 2000 88537 99209
Figures in MW
Thermal Hydro Nuclear Total
Target Ach Target Ach Target Ach Target Ach
Central 4880 3170 800 390 500 6180 3560 5761
State 3546 1760 300 200 0 3846 1960 5096
Private 2940 3780 205 205 0 3145 3985 12671
Total 11366 8710 1305 795 500 0 13171 9505 7217
12
2 CAPACITY ADDITION TARGET AND ACHIEVEMENT FOR 2017-18 (IN MW)
1 Capacity Addtion Targets and Achievements in the 12th Plan
SECTORTHERMAL HYDRO NUCLEAR TOTAL
File NoCEA-CH-14-1142018-Coordination Division
(MW)
Cummulative
Deviation
Target Achievement Target Achievement (+) (-)
Central 2760 250 0 250 0 -250
State 450615 1030 0 1030 69755 -960245
Private 0 0 600 0 600 600
Total 726615 1280 600 1280 669755 -610245
Central 710 0 0 110 110 0
State 130 0 0 12999 30 -9999
Private 0 0 0 0 0 0
Total 840 0 0 23999 140 -9999
Nuclear Central 0 0 0 0 0 0
Central 3470 250 0 360 110 -250
State 463615 1030 0 115999 99755 -1060235
Private 0 0 600 0 600 600
Total 810615 1280 600 151999 809755 -710235
Electricity Generation (MU) Targets and Achievements for 2016-17
13
2 Capacity Addition Targets Achievements During Oct-2018
Schemes Sector
Target 2018-19
April 2018- Oct 2018Oct-18
Hydro
All India
Capacity Addition TargetsAchievements during the Month of Oct-2018
Thermal
12
80
24
0
0
15
20
67
0
14
0
0
81
0
0
200
400
600
800
1000
1200
1400
1600
Thermal Hydro Nuclear Total
MW
Targets and Achievement during 2018-19Target Achievement
600
0 00 0
600
0
100
200
300
400
500
600
700
800
900
1000
Target Achievement
MW
Targets and Achievement during Oct 2018Thermal Hydro
Nuclear Total
File NoCEA-CH-14-1142018-Coordination Division
Coal Gas Diesel Total
State 1593400 287920 000 1881320 000 869755 68956 2820031
Private 2276083 55800 000 2331883 000 251400 1261535 3844818
Central 1258537 234406 000 1492943 162000 849622 32900 2537465
Sub Total 5128020 578126 000 5706146 162000 1970777 1363391 9202314
State 2128000 284982 000 2412982 000 544650 31119 2988751
Private 3488567 467600 000 3956167 000 48100 2005170 6009437
Central 1504295 328067 000 1832362 184000 162000 66130 2244492
Sub Total 7120862 1080649 000 8201511 184000 754750 2102418 11242679
State 1943250 79198 28788 2051236 000 1183803 52102 3287141
Private 1212450 532210 47370 1792030 000 000 3495815 5287845
Central 1422502 35958 000 1458460 332000 000 49190 1839650
Sub Total 4578202 647366 76158 5301726 332000 1183803 3597107 10414636
State 695000 10000 000 705000 000 353792 22511 1081303
Private 637500 000 000 637500 000 39900 84853 762253
Central 1387664 000 000 1387664 000 100520 1000 1489184
Sub Total 2720164 10000 000 2730164 000 494212 108364 3332740
State 000 49771 3600 53371 000 42200 25674 121245
Private 000 2450 000 2450 000 000 2571 5021
Central 52002 125360 000 177362 000 103000 500 280862
Sub Total 52002 177581 3600 233183 000 145200 28745 407128
State 000 000 4005 4005 000 000 525 4530
Private 000 000 000 000 000 000 221 221
Central 000 000 000 000 000 000 510 510
Sub Total 000 000 4005 4005 000 000 1256 5261
State 6359650 711871 36393 7107913 000 2994200 200887 10303000
Private 7614600 1058060 47370 8720030 000 339400 6850164 15909594
Central 5625000 723791 000 6348791 678000 1215142 150230 8392163
Total 19599250 2493722 83763 22176734 678000 4548742 7201281 34604757
Figures at decimal may not tally due to rounding off
Note -
(As per latest information available with MNRE)
Break up of RES all India as on 30092018 is given below (in MW)
450695 3461510 2402166 7201281
A Oct 2018 669755 MW
B Capacity Retired
during
Oct 2018 705 MW
C Oct 2018 0 MW
D Oct 2018 A-B+C -35245 MW
Share of Telangana from JEGURUPADU CCPP Ph II has been removed and the same has been added to private sector of Andhra Pradesh due to expiry of PPA as per
request from TS Transco
Region
ALL INDIA INSTALLED CAPACITY (IN MW) OF POWER STATIONS (As on 31102018)
(UTILITIES)
Net Capacity Added during
1 RES include SHP BP UampI Solar and Wind Energy Installed capacity in respect of RES (MNRE) as on 30092018
Small
Hydro PowerWind Power
Bio-PowerSolar Power
Total
CapacityBM PowerCogen Waste to Energy
2 U-1 to 7 (76995=69755 MW) of LAKWA REPLACEMENT POWER PROJECT commissioned in April 2018 but intimated in October 2018
has been added to state sector of Assam
1 Badarpur TPS (705 MW) has been retired from central sector of Northern Region
Capacity Up-rated
Ownership Sector
873080 13830
Capacity Added during
1 U-2 (600 MW) of MAHAN TPP has been commissioned and added to private sector of Madhya Pradesh
Grand TotalThermalNuclear Hydro
Islands
ALL INDIA
Abbreviation- SHP=Small Hydro Project (le 25 MW) BP=Biomass Power UampI=Urban amp Industrial Waste Power RES=Renewable Energy Sources
Northern Region
Western Region
Southern Region
Eastern Region
North Eastern
Region
RES
(MNRE)
Modewise breakup
File NoCEA-CH-14-1142018-Coordination Division
Coal Gas Diesel Total
State 13500 180040 000 193540 000 000 000 193540
Private 86922 10800 000 97722 000 000 12157 109879
Central 311272 20701 000 331973 10283 72309 000 414565
Sub-Total 411694 211541 000 623235 10283 72309 12157 717984
State 272000 15000 000 287000 000 110282 5930 403212
Private 408078 000 000 408078 000 20000 34745 462823
Central 129472 53561 000 183034 10094 66370181 500 259998
Sub-Total 809550 68561 000 878112 10094 196652 41175 1126032
State 000 000 000 000 000 69460 25661 95121
Private 000 000 000 000 000 99200 60536 159736
Central 18340 6201 000 24541 2895 122388 000 149824
Sub-Total 18340 6201 000 24541 2895 291048 86197 404681
State 000 17500 000 17500 000 123000 12903 153403
Private 000 000 000 000 000 000 5985 5985
Central 50639 12907 000 63547 6798 109188 000 179533
Sub-Total 50639 30407 000 81047 6798 232188 18888 338921
State 176000 15000 000 191000 000 259770 12780 463550
Private 511550 000 000 511550 000 28800 115462 655812
Central 85458 26401 000 111859 19681 92342 000 223882
Sub-Total 773008 41401 000 814409 19681 380912 128242 1343244
State 585000 60380 000 645380 000 109618 2385 757383
Private 388200 000 000 388200 000 10400 710680 1109280
Central 120625 22110 000 142735 55674 73901 29400 301710
Sub-Total 1093825 82490 000 1176315 55674 193919 742465 2168373
State 546900 000 000 546900 000 72410 2510 621820
Private 871433 000 000 871433 000 84200 266691 1222324
Central 379639 54949 000 434588 28948 180253 3000 646789
Sub-Total 1797972 54949 000 1852921 28948 336863 272201 2490933
State 000 000 000 000 000 125215 6787 132002
Private 9900 45000 000 54900 000 8800 52244 115944
Central 34324 6966 000 41290 3124 47554 000 91968
Sub-Total 44224 51966 000 96190 3124 181569 59031 339914
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 3035 3035
Central 3815 1503 000 5317 801 10171 000 16289
Sub-Total 3815 1503 000 5317 801 10171 3035 19324
124953 29105 000 154058 23703 75145 000 252907
State 1593400 287920 000 1881320 000 869755 68956 2820031
Private 2276083 55800 000 2331883 000 251400 1261535 3844818
Central 1258537 234406 000 1492943 162000 849622 32900 2537465
Grand Total 5128020 578126 000 5706146 162000 1970777 1363391 9202314
Uttar Pradesh
Uttarakhand
Chandigarh
Grand TotalThermalNuclear
Hydro
(Renewable)
RES
(MNRE)
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
NORTHERN REGION
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
(As on 31102018)
Central - Unallocated
Total (Northern
Region)
Delhi
Haryana
Himachal Pradesh
Jammu amp Kashmir
Punjab
Rajasthan
State Ownership Sector
Modewise breakup
File NoCEA-CH-14-1142018-Coordination Division
(As on 31102018)
Coal Gas Diesel Total
State 000 000 000 000 000 000 005 005
Private 000 4800 000 4800 000 000 091 4891
Central 45478 1967 000 47445 2600 000 000 50045
Sub-Total 45478 6767 000 52245 2600 000 096 54941
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 1301 1301
Central 12663 4334 000 16997 700 000 000 17697
Sub-Total 12663 4334 000 16997 700 000 1301 18998
State 475000 217782 000 692782 000 77200 800 770782
Private 776567 396000 000 1172567 000 000 729782 1902349
Central 309051 42400 000 351451 55900 000 23830 431181
Sub-Total 1560618 656182 000 2216800 55900 77200 754412 3104312
State 408000 000 000 408000 000 170366 8396 586762
Private 617400 10000 000 627400 000 000 378205 1005605
Central 279441 25700 000 305141 27300 152000 30000 514441
Sub-Total 1304841 35700 000 1340541 27300 322366 416601 2106808
State 228000 000 000 228000 000 12000 1105 241105
Private 849000 000 000 849000 000 000 52430 901430
Central 195344 000 000 195344 4800 10000 000 210144
Sub-Total 1272344 000 000 1272344 4800 22000 53535 1352679
State 1017000 67200 000 1084200 000 285084 20813 1390097
Private 1245600 56800 000 1302400 000 48100 842815 2193315
Central 433475 227273 000 660748 69000 000 12300 742048
Sub-Total 2696075 351273 000 3047348 69000 333184 875927 4325459
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 546 546
Central 17444 6634 000 24078 900 000 000 24978
Sub-Total 17444 6634 000 24078 900 000 546 25524
211400 19759 000 231159 22800 000 000 253959
State 2128000 284982 000 2412982 000 544650 31119 2988751
Private 3488567 467600 000 3956167 000 48100 2005170 6009437
Central 1504295 328067 000 1832362 184000 162000 66130 2244492
Grand Total 7120862 1080649 000 8201511 184000 754750 2102418 11242679
Central - Unallocated
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
WESTERN REGION
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
State Ownership Sector
Modewise breakup
Grand TotalThermalNuclear
Hydro
(Renewable)
RES
(MNRE)
Total (Western
Region)
Goa
Daman amp Diu
Gujarat
Madhya Pradesh
Chhattisgarh
Maharashtra
Dadra amp Nagar
Naveli
File NoCEA-CH-14-1142018-Coordination Division
(As on 31102018)
Coal Gas Diesel Total
State 501000 23540 000 524540 000 167360 4875 696775
Private 387388 381318 3680 772386 000 000 693073 1465459
Central 167456 000 000 167456 12727 000 25000 205183
Sub-Total 1055844 404858 3680 1464382 12727 167360 722948 2367417
State 508250 000 000 508250 000 247993 4022 760265
Private 83945 83182 000 167127 000 000 375048 542175
Central 195612 000 000 195612 14873 000 1000 211485
Sub-Total 787807 83182 000 870989 14873 247993 380070 1513925
State 502000 000 12792 514792 000 359980 15533 890305
Private 195850 000 2520 198370 000 000 1275640 1474010
Central 282920 000 000 282920 69800 000 000 352720
Sub-Total 980770 000 15312 996082 69800 359980 1291173 2717035
State 000 000 15996 15996 000 188150 15402 219548
Private 61500 17400 000 78900 000 000 20899 99799
Central 114322 35958 000 150280 36200 000 5000 191480
Sub-Total 175822 53358 15996 245176 36200 188150 41301 510827
State 432000 52408 000 484408 000 220320 12270 716998
Private 483767 50310 41170 575247 000 000 1130984 1706231
Central 448952 000 000 448952 144800 000 18190 611942
Sub-Total 1364719 102718 41170 1508607 144800 220320 1161444 3035171
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 000 000
Central 10000 000 000 10000 000 000 000 10000
Sub-Total 10000 000 000 10000 000 000 000 10000
State 000 3250 000 3250 000 000 000 3250
Private 000 000 000 000 000 000 171 171
Central 24840 000 000 24840 8600 000 000 33440
Sub-Total 24840 3250 000 28090 8600 000 171 36861
178400 000 000 178400 45000 000 000 223400
State 1943250 79198 28788 2051236 000 1183803 52102 3287141
Private 1212450 532210 47370 1792030 000 000 3495815 5287845
Central 1422502 35958 000 1458460 332000 000 49190 1839650
Grand Total 4578202 647366 76158 5301726 332000 1183803 3597107 10414636
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
SOUTHERN REGION
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
State Ownership Sector
Modewise breakup
Grand TotalThermal RES
(MNRE)Nuclear
Hydro
(Renewable)
Kerala
Tamil Nadu
NLC
Puducherry
Central - Unallocated
Total (Southern
Region)
Andhra Pradesh
Telangana
Karnataka
File NoCEA-CH-14-1142018-Coordination Division
(As on 31102018)
Coal Gas Diesel Total
State 71000 000 000 71000 000 000 7070 78070
Private 28100 000 000 28100 000 000 25545 53645
Central 291433 000 000 291433 000 11000 000 302432
Sub-Total 390533 000 000 390533 000 11000 32615 434147
State 42000 000 000 42000 000 13000 405 55405
Private 73000 000 000 73000 000 000 3207 76207
Central 39374 000 000 39374 000 6100 000 45474
Sub-Total 154374 000 000 154374 000 19100 3612 177086
State 540000 10000 000 550000 000 98600 9195 657795
Private 242500 000 000 242500 000 000 34452 276952
Central 76077 000 000 76077 000 41000 000 117077
Sub-Total 858577 10000 000 868577 000 139600 43647 1051824
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 000 000
Central 698504 000 000 698504 000 18620 000 717124
Sub-Total 698504 000 000 698504 000 18620 000 717124
State 42000 000 000 42000 000 206192 630 248822
Private 293900 000 000 293900 000 000 21648 315548
Central 163390 000 000 163390 000 8900 1000 173290
Sub-Total 499290 000 000 499290 000 215092 23278 737660
State 000 000 000 000 000 36000 5211 41211
Private 000 000 000 000 000 39900 001 39901
Central 8703 000 000 8703 000 6400 000 15103
Sub-Total 8703 000 000 8703 000 82300 5212 96215
110183 000 000 110183 000 8501 000 118684
State 695000 10000 000 705000 000 353792 22511 1081303
Private 637500 000 000 637500 000 39900 84853 762253
Central 1387664 000 000 1387664 000 100520 1000 1489184
Grand Total 2720164 10000 000 2730164 000 494212 108364 3332740
(As on 31102018)
Coal Gas Diesel Total
State 000 32821 000 32821 000 10000 3001 45822
Private 000 2450 000 2450 000 000 1680 4130
Central 27902 43556 000 71458 000 36851 000 108309
Sub-Total 27902 78827 000 106729 000 46851 4681 158261
State 000 000 000 000 000 000 10710 10710
Private 000 000 000 000 000 000 539 539
Central 2470 4682 000 7152 000 11800 000 18952
Sub-Total 2470 4682 000 7152 000 11800 11249 30201
State 000 000 000 000 000 32200 3103 35303
Private 000 000 000 000 000 000 006 006
Central 3040 10969 000 14009 000 7446 000 21455
Sub-Total 3040 10969 000 14009 000 39646 3109 56764
State 000 16950 000 16950 000 000 1601 18551
Private 000 000 000 000 000 000 009 009
Central 3740 43695 000 47435 000 7077 500 55012
Sub-Total 3740 60645 000 64385 000 7077 2110 73572
State 000 000 3600 3600 000 000 545 4145
Private 000 000 000 000 000 000 217 217
Central 3140 7157 000 10297 000 9677 000 19974
Sub-Total 3140 7157 3600 13897 000 9677 762 24336
State 000 000 000 000 000 000 3067 3067
Private 000 000 000 000 000 000 100 100
Central 2140 4893 000 7033 000 5860 000 12893
Sub-Total 2140 4893 000 7033 000 5860 3167 16060
State 000 000 000 000 000 000 3647 3647
Private 000 000 000 000 000 000 020 020
Central 2070 4046 000 6116 000 9913 000 16029
Sub-Total 2070 4046 000 6116 000 9913 3667 19696
7500 6362 000 13862 000 14376 000 28238
State 000 49771 3600 53371 000 42200 25674 121245
Private 000 2450 000 2450 000 000 2571 5021
Central 52002 125360 000 177362 000 103000 500 280862
Grand Total 52002 177581 3600 233183 000 145200 28745 407128
Central - Unallocated
Total (Eastern
Region)
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
NORTH-EASTERN REGION
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
State Ownership Sector
Modewise breakup
Grand TotalThermalNuclear
Bihar
Jharkhand
West Bengal
DVC
Odisha
Sikkim
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
EASTERN REGION
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
Ownership Sector
Modewise breakup
Grand TotalThermalNuclear
Hydro
(Renewable)
RES
(MNRE)
Manipur
Nagaland
State
Mizoram
Central - Unallocated
Total (North-
Eastern Region)
Hydro
(Renewable)
RES
(MNRE)
Assam
Arunachal Pradesh
Meghalaya
Tripura
File NoCEA-CH-14-1142018-Coordination Division
(As on 31102018)
Coal Gas Diesel Total
State 000 000 4005 4005 000 000 525 4530
Private 000 000 000 000 000 000 146 146
Central 000 000 000 000 000 000 510 510
Sub-Total 000 000 4005 4005 000 000 1181 5186
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 075 075
Central 000 000 000 000 000 000 000 000
Sub-Total 000 000 000 000 000 000 075 075
State 000 000 4005 4005 000 000 525 4530
Private 000 000 000 000 000 000 221 221
Central 000 000 000 000 000 000 510 510
Grand Total 000 000 4005 4005 000 000 1256 5261
19
Andaman amp
Nicobar
lakshadweep
Total (Islands)
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
State Ownership Sector
Modewise breakup
Grand TotalThermalNuclear
Hydro
(Renewable)
RES
(MNRE)
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
ISLANDS
File NoCEA-CH-14-1142018-Coordination Division
SrNo Contents Page
1 Executive summary of Target and Achievement of Transmission Lines during 2018-19
20(1)
2 List of Transmission Lines CommissionedReady for commissioning during Oct-2018 20(2)
Section C - Transmission Lines
File NoCEA-CH-14-1142018-Coordination Division
Executive summary of Target and Achievement of Transmission Lines during 2018-19 As on Oct-18
(All figures in circuit kms)
Centr
al S
ecto
r
Sta
te S
ecto
r
JV
Private
Secto
r
To
tal
Centr
al S
ecto
r
Sta
te S
ecto
r
JV
Private
Secto
r
To
tal
Centr
al S
ecto
r
Sta
te S
ecto
r
JV
Private
Secto
r
To
tal
Centr
al S
ecto
r
Sta
te S
ecto
r
JV
Private
Secto
r
To
tal
Centr
al S
ecto
r
Sta
te S
ecto
r
JV
Private
Secto
r
To
tal
Cen
tral S
ecto
r
Sta
te S
ecto
r
JV
Pri
vate
Secto
r
Gra
nd
To
tal
0 0 0 0 0 0 0 0 4692 766 827 6285 3045 5906 980 9931 553 5878 0 6431 8290 12550 1807 22647
Oct18 Programme 0 0 0 0 0 0 0 0 300 0 0 300 662 90 562 1314 0 723 0 723 962 813 562 2337
Achievement 0 0 0 0 0 0 0 0 729 0 0 729 471 266 0 737 0 401 0 401 1200 667 0 1867
Upto Oct-18 Programme 0 0 0 0 0 0 0 0 3004 416 0 3420 1350 3109 562 5021 481 4346 0 4827 4835 7871 562 13268
Achievement 0 0 0 0 0 0 0 0 2286 0 178 2464 1436 1783 1595 4814 60 4461 0 4521 3782 6244 1773 11799
20(1)
220 kV Grand Total 800 kV 500 kV
Programme 2018-19
Programme
Achievement
HVDC765 kV 400 kV
File NoCEA-CH-14-1142018-Coordination Division
SlNo Line
Length
(cKM)
1 2 3 4 5 6
1 765 Jharsuguda - Dharamjaygarh line DC PGCIL 296
2 765LILO of Kurnool - Thirvualam line at
CuddapahDC PGCIL 190
3 765 Salem PS - Madhugiri PS line SC PGCIL 243
4 400 Cuddapah - Hindupur line (Q) DC PGCIL 338
5 400LILO of Both Ckt of Bamnauli - Samaypur at
TughlakabadMC PGCIL 114
6 400LILO-Out of Cuddapah - Hindupur line (Q)
(Both Ckts) at NP Kunta ssDC PGCIL 19
1200
7 400LILO of Sterlite - Meramundali at Lapanga
4oo kV ssDC OPTCL 14
8 400 Sterlite - Lapanga line DC OPTCL 37
9 400 TMDC Podili - Sattapenalli line DC APTRANSCO 215
10 230Neyveli 230110 kV ss - Eachangadu
230kV FeederSC TANTRANSCO 1
11 230 NNTPS - Neyveli 230110kV ss DC TANTRANSCO 2
12 220 Ajmer (400 kV) - Bherunda (TK) DC RVPNL 100
13 220 Aligarh - Atrauli line DC UPPTCL 77
14 220 Khandwa - Chhanera line DC MPPTCL 78
15 220LILO of one Ckt of Hadala - Sartanpar line
at Wankaner on MC towersDC GETCO 6
16 220 LILO of one Ckt of Vita - Miraj at Alkud ss DC MSETCL 27
17 220 Mendhigiri - Alkud ss DC MSETCL 110
667
1867
20(2)
Grand Total
2Transmission Lines (220 kV and above) CommissionedReady for commissioning During Oct-2018
As on 31-10-18
Voltage
Level (kV)Name of Transmission Lines
Circuit
Type
Executing
Agency
CENTRAL SECTOR
Total of CENTRAL SECTOR
STATE SECTOR Sector
Total of STATE SECTOR
File NoCEA-CH-14-1142018-Coordination Division
SN Contents Page
1 Executive summary of Target and Achievement of Substations during 2018-19 21(1)
2Sub Stations (220 kV and above) commissionedready for commisssioning during Oct-
201821(2)
Section D - Sub Stations
File NoCEA-CH-14-1142018-Coordination Division
1 Executive summary of Target and Achievement of Substations during 2018-19 As on Oct-18
(All figures in circuit MVA)
Centr
al S
ecto
r
Sta
te S
ecto
r
JV
Private
Secto
r
To
tal
Centr
al S
ecto
r
Sta
te S
ecto
r
JV
Private
Secto
r
To
tal
Centr
al S
ecto
r
Sta
te S
ecto
r
JV
Private
Secto
r
To
tal
Centr
al S
ecto
r
Sta
te S
ecto
r
JV
Private
Secto
r
To
tal
Centr
al S
ecto
r
Sta
te S
ecto
r
JV
Private
Secto
r
To
tal
Cen
tral S
ecto
r
Sta
te S
ecto
r
JV
Pri
vate
Secto
r
Gra
nd
To
tal
3000 0 0 3000 0 0 0 0 22200 0 0 22200 8185 13085 630 21900 740 14760 0 15500 34125 27845 630 62600
Oct18 Programme 0 0 0 0 0 0 0 0 0 0 0 0 1000 1260 630 2890 0 1400 0 1400 1000 2660 630 4290
Achievement 0 0 0 0 0 0 0 0 3000 0 0 3000 1500 3120 0 4620 0 2220 0 2220 4500 5340 0 9840
Upto Oct-18 Programme 0 0 0 0 0 0 0 0 10000 0 0 10000 6130 7435 630 14195 0 9670 0 9670 16130 17105 630 33865
Achievement 0 0 0 0 0 0 0 0 14000 0 0 14000 9000 7550 630 17180 0 10610 0 10610 23000 18160 630 41790
21(1)
220 kV Grand Total 800 kV 500 kV
Programme 2018-19
Programme
Achievement
HVDC765 kV 400 kV
File NoCEA-CH-14-1142018-Coordination Division
As on 31-10-18
Sl Voltage Ratio Capacity
No (kVkV) (MWMVA)
1 2 3 4 5
1 Cuddapah Ss 765400 PGCIL 3000
2 Tughlakabad SS (GIS) 400220 PGCIL 1500
Total of CENTRAL SECTOR 4500
3 Panki Kanpur (Aug) TF-I 400200 UPPTCL 75
4 Hindupur ss (1st ICT) 400220 APTRANSCO 315
5 Thappagundu ss 400110 TANTRANSCO 600
6 Mendhasal (2nd power TF) 400220 OPTCL 20
7 Jodhpur ss (New) 400220 RVPNL 315
8 Shankarpally 400220 TSTRANSCO 500
9 Podili ss (1st ICT) 400220 APTRANSCO 315
10 Doni (Gadag)SS 400220 KPTCL 1000
11 Porur (Addl TF) 230110 TANTRANSCO 100
12 Anuppankulam (Addl TF) 230110 TANTRANSCO 60
13 Neyveli SS 230110 TANTRANSCO 480
14 Savarkundla (Aug) 22066 GETCO 60
15 Bhuna (Aug) 220132 HVPNL 100
16 Madanpur (Aug) 22066 HVPNL 100
17 Gurgaon Sec-52A (Aug) 22066 HVPNL 160
18 IA Hisar (Aug) 220132 HVPNL 50
19 Narwana (Aug) 220132 HVPNL 60
20 Therubali (3rd Auto TF) 220132 OPTCL 160
21 Halasar ss 220132 RVPNL 160
22 Bansi Siddaharthnagar (Aug) TF-I 220132 UPPTCL 60
23 Hata Kushinagar (New) TF-I 220132 UPPTCL 100
24 Gomti nagar Lucknow (Aug) TF-IV 22033 UPPTCL 60
25 Kanpur Road Lucknow (New) TF-III 22033 UPPTCL 60
26 Asoj (Aug) 22066 GETCO 150
27 Kangasiyali (Aug) 22066 GETCO 60
28 Karmsad (Aug) 22066 GETCO 160
29 Lalpar (Aug) 22066 GETCO 60
TOTAL STATE SECTOR 5340
GRAND TOTAL 9840
21(2)
PRIVATE SECTOR
CENTRAL SECTOR
STATE SECTOR
2Sub-Stations (220 kV and above) CommissionedReady for commissioning During Oct-2018
Name of Sub StationsExecuting
Agency
File NoCEA-CH-14-1142018-Coordination Division
SN Contents Page
1 Electricity Generation (MU) Targets and Achievements for 2018-19 22
Section E - Electricity Generation
File NoCEA-CH-14-1142018-Coordination Division
Programme Achievement Ach Programme Achievement Ach
Central Sector 35160700 3028100 3162321 10443 20144400 21150469 10499
State Sector 35132000 3010000 3017260 10024 19922100 19549030 9813
PvtIPP Sector 36999700 3240600 3375603 10417 21598300 20794155 9628
PvtUTL Sector 1857600 164500 180597 10979 1130900 1203107 10638
Total 109150000 9443200 9735781 10310 62795700 62696761 9984
Central Sector 5617600 420900 451004 10715 4193000 4045436 9648
State Sector 6110600 559500 708469 12663 4049400 4433000 10947
PvtIPP Sector 1141800 80500 90122 11195 976400 1021963 10467
PvtUTL Sector 130000 11300 12564 11119 76700 99943 13030
Total 13000000 1072200 1262159 11772 9295500 9600342 10328
Central Sector 3850000 353300 303310 8585 2068900 2203540 10651
Total 3850000 353300 303310 8585 2068900 2203540 10651
Bhutan Import 500000 63300 35395 5592 347000 416660 12007
Central Sector 44628300 3802300 3916635 10301 26406300 27399445 10376
State Sector 41242600 3569500 3725729 10438 23971500 23982030 10004
Pvt Sector 40129100 3496900 3658886 10463 23782300 23119168 9721
Total 126500000 10932000 11336645 10370 74507100 74917303 10055
Provisional based on actual-cum-Assesment
Figs in MU
Cummulative
Achievement
Cummulative
Achievement
Sep-18 Sep-17 Upto Sep-2018 Upto Sep-2017
1073794 748889 7332680 5660929
22
Renewable Energy Generation
Achievement
Oct-2018
1 Electricity Generation (MU) Targets and Achievememts for 2018-19
All India Energy Generation During April 2018- Oct 2018 (MU)
Target (2018-19)April 2018- Oct 2018
Sector
Hydro
Thermal
Nuclear
627957
92955
20689
745071
626968
96003
22035
749173
0
100000
200000
300000
400000
500000
600000
700000
800000
Thermal Hydro Nuclear Total
Programme
Achievement
File NoCEA-CH-14-1142018-Coordination Division
SN Contents Page
1 Energy Power Supply Position (Provisional) for Oct-2018 and during April 2018- Oct 2018 23
2 Peak Power Supply Position (Provisional) for Oct-2018 and during April 2018- Oct 2018 24
3 Energy Power Supply Position (Revised) for Sep-2018 and during April 2018- Sept 2018 25
4 Peak Power Supply Position (Revised) for Sep-2018 and during April 2018- Sept 2018 26
5 Notified Power cuts Restrictions on Industries during Oct-2018 27
6 Power Supply to Agricultural Sector during Oct-2018 28
Section F - Power supply position
File NoCEA-CH-14-1142018-Coordination Division
आकड़ मममलयन यननट नट Figures in MU net
ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied
कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )
चडीगढ़ Chandigarh 108 108 0 00 1055 1055 0 00
दिलली Delhi 2490 2489 1 00 22524 22510 14 01
हरियजणज Haryana 4554 4554 0 00 35205 35205 0 00
दहमजचल परिश Himachal Pradesh 788 787 2 02 5728 5560 168 29
रमम कशमीि Jammu amp Kashmir 1497 1219 278 186 10982 8865 2117 193
परजब Punjab 4418 4418 0 00 38832 38819 13 00
िजरसथजन Rajasthan 6748 6748 0 00 45341 45181 160 04
उतति परिश Uttar Pradesh 10136 9973 164 16 75485 74808 676 09
उततिजखड Uttarakhand 1083 1081 3 03 8395 8310 85 10
उततरी कषतर Northern Region 31822 31375 447 14 243547 240314 3233 13
छततीसगढ़ Chhattisgarh 2454 2453 1 00 16119 16091 28 02
गरिजत Gujarat 11636 11636 0 00 70782 70768 14 00
मधय परिश Madhya Pradesh 5860 5859 1 00 38412 38410 2 00
महजिजषटर Maharashtra 15223 15095 128 08 95489 95355 134 01
िमन औि दिउ Daman amp Diu 216 216 0 00 1523 1523 0 00
िजिि व नगि हवली Dadra amp Nagar Haveli 553 553 0 00 3757 3757 0 00
गोवज Goa 366 366 0 00 2497 2495 2 01
पशचिमी कषतर Western Region 36308 36178 130 04 228579 228398 180 01
आनधर परिश Andhra Pradesh 5860 5854 6 01 37377 37334 43 01
तलगजनज Telangana 6748 6742 6 01 38251 38205 46 01
कनजाटक Karnataka 5842 5835 7 01 39111 39059 52 01
किल Kerala 2116 2096 20 09 14256 14160 96 07
तममल नजड Tamil Nadu 8611 8601 10 01 65742 65666 76 01
पडचिी Puducherry 216 215 1 05 1654 1646 8 05
लकष-दवीप Lakshadweep 4 4 0 0 27 27 0 0
दकषकषणी कषतर Southern Region 29392 29342 50 02 196390 196069 321 02
बबहजि Bihar 2742 2738 4 01 19143 18951 192 10
िजमोिि घजटी ननगम DVC 1712 1698 13 08 13096 12828 268 20
झजिखणड Jharkhand 701 697 4 06 5022 4949 73 15
ओडडशज Odisha 3147 3134 13 04 20224 20192 32 02
पशशचम बगजल West Bengal 4204 4200 4 01 33008 32881 127 04
मसशककम Sikkim 40 40 0 00 279 279 0 01
अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 67 202 188 13 67
परवी कषतर Eastern Region 12547 12507 40 03 90772 90080 692 08
अरणजचल परिश Arunachal Pradesh 67 66 1 09 502 496 7 13
असम Assam 833 809 24 29 6153 5903 250 41
मणणपि Manipur 72 71 1 10 485 478 7 14
मघजलय Meghalaya 147 147 0 00 1043 1042 0 00
ममज़ोिम Mizoram 63 62 1 08 365 359 5 14
नजगजलड Nagaland 76 67 8 110 540 481 59 109
बिपिज Tripura 130 129 1 09 1025 1007 19 18
उततर-परवी कषतर North-Eastern Region 1387 1351 35 25 10113 9766 346 34
समपणण भारत All India 111455 110753 702 06 769399 764627 4773 06
23
ऊराण वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Energy Power Supply Position Report (Provisional)
राजयStateअकरबर2018 October2018 अपरल2018 -अकरबर2018 April2018 to October2018
ऊरजा पनत ा म कमी ऊरजा पनत ा म कमीEnergy not Supplied
Excludes energy exported to Bangladesh
Energy not Supplied
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
File NoCEA-CH-14-1142018-Coordination Division
अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met
कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )
चडीगढ़ Chandigarh 217 217 0 00 369 369 0 00
दिलली Delhi 4713 4713 0 00 7016 7016 0 00
हरियजणज Haryana 7948 7948 0 00 10270 10270 0 00
दहमजचल परिश Himachal Pradesh 1520 1520 0 00 1520 1520 0 00
रमम कशमीि Jammu amp Kashmir 2836 2269 567 200 2951 2361 590 200
परजब Punjab 7979 7979 0 00 12638 12638 0 00
िजरसथजन Rajasthan 11450 11450 0 00 11698 11698 0 00
उतति परिश Uttar Pradesh 17434 16745 688 39 20498 20062 436 21
उततिजखड Uttarakhand 1943 1943 0 00 2143 2143 0 00
उततरी कषतर Northern Region 50659 49635 1024 20 63166 61726 1440 23
छततीसगढ़ Chhattisgarh 4414 4268 146 33 4414 4268 146 33
गरिजत Gujarat 18148 18130 19 01 18148 18130 19 01
मधय परिश Madhya Pradesh 11356 11317 39 03 11356 11317 39 03
महजिजषटर Maharashtra 23864 23159 705 30 23864 23254 610 26
िमन औि दिउ Daman amp Diu 342 341 1 02 357 356 1 02
िजिि व नगि हवली Dadra amp Nagar Haveli 784 780 4 05 816 815 1 01
गोवज Goa 536 536 0 00 596 596 0 00
पशचिमी कषतर Western Region 56548 55695 853 15 56548 55695 853 15
आनधर परिश Andhra Pradesh 9435 9435 0 00 9435 9435 0 00
तलगजनज Telangana 10603 10603 0 00 10815 10815 0 00
कनजाटक Karnataka 10741 10741 0 00 10741 10741 0 00
किल Kerala 3727 3644 83 22 4050 3997 53 13
तममल नजड Tamil Nadu 14747 14333 414 28 15029 14981 47 03
पडचिी Puducherry 363 362 1 03 420 400 19 46
लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0
दकषकषणी कषतर Southern Region 45279 45226 53 01 45946 45684 262 06
बबहजि Bihar 4945 4945 0 00 5050 5045 5 01
िजमोिि घजटी ननगम DVC 2729 2729 0 00 2874 2874 0 00
झजिखणड Jharkhand 1260 1260 0 00 1339 1284 55 41
ओडडशज Odisha 5624 5224 400 71 5624 5357 268 48
पशशचम बगजल West Bengal 8775 8775 0 00 9130 9123 7 01
मसशककम Sikkim 86 86 0 00 90 90 0 00
अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7
परवी कषतर Eastern Region 22959 22567 392 17 22959 22567 392 17
अरणजचल परिश Arunachal Pradesh 138 125 13 94 138 133 5 37
असम Assam 1785 1704 81 45 1865 1809 56 30
मणणपि Manipur 187 185 2 11 193 186 7 36
मघजलय Meghalaya 336 336 0 00 371 368 2 07
ममज़ोिम Mizoram 99 97 2 20 103 98 4 41
नजगजलड Nagaland 134 131 3 22 156 138 18 117
बिपिज Tripura 269 269 0 00 298 293 5 17
उततर-परवी कषतर North-Eastern Region 2790 2700 90 32 2967 2850 117 39
समपणण भारत All India 172945 170604 2341 14 177022 175528 1494 08
24
अधिकतम वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Peak Power Supply Position Report (Provisional)
आकड़ मगज वजट नट Figures in MW netअपरल2018 -अकरबर2018 April2018 to October2018
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
मजग की पनता म कमी Demand not Met
Excludes the supply to Bangladesh
राजयStateअकरबर2018 October2018
मजग की पनता म कमी Demand not Met
File NoCEA-CH-14-1142018-Coordination Division
आकड़ मममलयन यननट नट Figures in MU net
ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied
कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )
चडीगढ़ Chandigarh 141 141 0 00 947 947 0 00
दिलली Delhi 2925 2924 1 00 20034 20021 13 01
हरियजणज Haryana 4794 4794 0 00 30651 30651 0 00
दहमजचल परिश Himachal Pradesh 876 853 24 27 4940 4773 167 34
रमम कशमीि Jammu amp Kashmir 1520 1246 274 180 9485 7646 1839 194
परजब Punjab 5575 5575 0 00 34414 34401 13 00
िजरसथजन Rajasthan 6202 6201 0 00 38594 38434 160 04
उतति परिश Uttar Pradesh 10211 10124 86 08 65349 64836 513 08
उततिजखड Uttarakhand 1162 1149 13 11 7311 7229 82 11
उततरी कषतर Northern Region 33405 33008 398 12 211725 208939 2786 13
छततीसगढ़ Chhattisgarh 2403 2388 15 06 13665 13638 27 02
गरिजत Gujarat 10122 10122 0 00 59146 59132 14 00
मधय परिश Madhya Pradesh 5492 5491 1 00 32552 32551 1 00
महजिजषटर Maharashtra 13615 13612 3 00 80266 80260 6 00
िमन औि दिउ Daman amp Diu 221 221 0 00 1306 1306 0 00
िजिि व नगि हवली Dadra amp Nagar Haveli 551 551 0 00 3204 3204 0 00
गोवज Goa 339 339 0 00 2131 2128 2 01
पशचिमी कषतर Western Region 32742 32723 19 01 192270 192220 50 00
आनधर परिश Andhra Pradesh 5294 5287 7 01 31518 31480 37 01
तलगजनज Telangana 6279 6272 8 01 31503 31463 40 01
कनजाटक Karnataka 5701 5693 8 01 33269 33225 45 01
किल Kerala 2050 2026 24 12 12140 12063 76 06
तममल नजड Tamil Nadu 8971 8959 12 01 57131 57065 66 01
पडचिी Puducherry 226 224 2 08 1438 1431 7 05
लकष-दवीप Lakshadweep 4 4 0 0 23 23 0 0
दकषकषणी कषतर Southern Region 28520 28460 60 02 166998 166727 271 02
बबहजि Bihar 2839 2793 46 16 16400 16213 188 11
िजमोिि घजटी ननगम DVC 1901 1750 151 79 11384 11130 254 22
झजिखणड Jharkhand 740 723 17 22 4321 4252 69 16
ओडडशज Odisha 2921 2918 3 01 17077 17058 19 01
पशशचम बगजल West Bengal 4902 4879 23 05 28804 28681 123 04
मसशककम Sikkim 39 39 0 01 239 239 0 01
अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 67 173 162 12 67
परवी कषतर Eastern Region 13341 13102 240 18 78225 77573 652 08
अरणजचल परिश Arunachal Pradesh 74 73 1 10 435 429 6 14
असम Assam 950 914 36 38 5320 5094 226 43
मणणपि Manipur 70 69 1 11 414 408 6 15
मघजलय Meghalaya 150 150 0 01 896 896 0 01
ममज़ोिम Mizoram 58 57 1 12 302 297 5 16
नजगजलड Nagaland 80 72 8 104 464 414 50 108
बिपिज Tripura 192 191 1 07 895 878 17 19
उततर-परवी कषतर North-Eastern Region 1575 1527 48 31 8726 8415 311 36
समपणण भारत All India 109584 108819 765 07 657944 653873 4071 06
Energy not Supplied Energy not Supplied
ससतबर2018 September2018 अपरल2018 -ससतबर2018 April2018 to September2018
ऊरजा पनत ा म कमी ऊरजा पनत ा म कमी
Excludes energy exported to Bangladesh
राजयState
ऊराण वरवदयत आपरतण शथिरत ररपोरण (सशोधित) Energy Power Supply Position Report (Revised)
25
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
File NoCEA-CH-14-1142018-Coordination Division
अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met
कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )
चडीगढ़ Chandigarh 293 293 0 00 369 369 0 00
दिलली Delhi 5358 5358 0 00 7016 7016 0 00
हरियजणज Haryana 9008 9008 0 00 10270 10270 0 00
दहमजचल परिश Himachal Pradesh 1466 1466 0 00 1479 1479 0 00
रमम कशमीि Jammu amp Kashmir 2951 2361 590 200 2951 2361 590 200
परजब Punjab 11405 11405 0 00 12638 12638 0 00
िजरसथजन Rajasthan 10612 10612 0 00 11698 11698 0 00
उतति परिश Uttar Pradesh 18346 18121 225 12 20498 20062 436 21
उततिजखड Uttarakhand 1996 1996 0 00 2143 2143 0 00
उततरी कषतर Northern Region 56407 55649 758 13 63166 61726 1440 23
छततीसगढ़ Chhattisgarh 4404 4075 328 75 4404 4136 268 61
गरिजत Gujarat 16963 16963 0 00 17053 16963 90 05
मधय परिश Madhya Pradesh 8811 8771 41 05 8811 8775 36 04
महजिजषटर Maharashtra 22455 22349 106 05 23395 23254 141 06
िमन औि दिउ Daman amp Diu 357 356 1 02 357 356 1 02
िजिि व नगि हवली Dadra amp Nagar Haveli 816 815 1 01 816 815 1 01
गोवज Goa 596 596 0 00 596 596 0 00
पशचिमी कषतर Western Region 52933 52895 38 01 53841 52895 945 18
आनधर परिश Andhra Pradesh 9435 9416 19 02 9435 9416 19 02
तलगजनज Telangana 10815 10815 0 00 10815 10815 0 00
कनजाटक Karnataka 10103 10090 13 01 10690 10688 2 00
किल Kerala 3888 3638 251 64 4050 3997 53 13
तममल नजड Tamil Nadu 14556 14553 3 00 15029 14981 47 03
पडचिी Puducherry 390 372 17 45 420 400 19 46
लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0
दकषकषणी कषतर Southern Region 45542 45428 114 02 45946 45684 262 06
बबहजि Bihar 5050 5045 5 01 5050 5045 5 01
िजमोिि घजटी ननगम DVC 2641 2641 0 00 2874 2874 0 00
झजिखणड Jharkhand 1233 1233 0 00 1339 1284 55 41
ओडडशज Odisha 4906 4906 0 00 5357 5357 0 00
पशशचम बगजल West Bengal 8644 8639 5 01 9130 9123 7 01
मसशककम Sikkim 78 78 0 00 90 90 0 00
अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7
परवी कषतर Eastern Region 22110 22100 10 00 22470 22290 180 08
अरणजचल परिश Arunachal Pradesh 132 130 2 15 138 133 5 37
असम Assam 1865 1809 56 30 1865 1809 56 30
मणणपि Manipur 184 182 2 13 193 186 7 36
मघजलय Meghalaya 317 317 0 00 371 368 2 07
ममज़ोिम Mizoram 95 93 2 23 103 98 4 41
नजगजलड Nagaland 142 138 5 32 156 138 18 117
बिपिज Tripura 296 293 3 10 298 293 5 17
उततर-परवी कषतर North-Eastern Region 2921 2850 71 24 2967 2850 117 39
समपणण भारत All India 177022 175528 1494 08 177022 175528 1494 08
26
मजग की पनता म कमी मजग की पनता म कमी Demand not MetDemand not Met
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
Excludes the supply to Bangladesh
अधिकतम वरवदयत आपरतण शथिरत ररपोरण (सशोधित) Peak Power Supply Position Report (Revised)
आकड़ मगज वजट नट Figures in MW net
राजयStateससतबर2018 September2018 अपरल2018 -ससतबर2018 April2018 to September2018
File NoCEA-CH-14-1142018-Coordination Division
अकरबर2018 October2018अपरल2018 -अकरबर2018 April2018 to October2018
उततरी कषतर Northern Region
चडीगढ़ Chandigarh Data not received Data not received
दिलली Delhi
हरियजणज Haryana
दहमजचल परिश Himachal Pradesh
रमम कशमीि Jammu amp Kashmir Data not received Data not received
परजब Punjab
िजरसथजन Rajasthanउतति परिश Uttar Pradesh
उततिजखड Uttarakhand
पशचिमी कषतर Western Region
छततीसगढ़ Chhattisgarh
गरिजत Gujarat
मधय परिश Madhya Pradesh
महजिजषटर Maharashtra
गोवज Goa
दकषकषणी कषतर Southern Region
आनधर परिश Andhra Pradesh
तलगजनज Telangana
कनजाटक Karnataka
किल Kerala
तममल नजड Tamil Nadu
पडचिी Puducherryपरवी कषतर Eastern Region
बबहजि Bihar
झजिखणड Jharkhand
ओडडशज Odisha
पशशचम बगजल West Bengal
N
o No
tified
Cuts
N
o No
tified
Cuts
27
अकरबर 2018 म इडथरीर पर वरवदयत करौती का वरवरवरण Notified Power CutsRestrictions on Industries during October2018
राजय कषतर State Regionऊराणमाग करौती EnergyDemand Cut
No Notified Cuts No Notified Cuts
File NoCEA-CH-14-1142018-Coordination Division
अकरबर2018 October2018अपरल2018 -अकरबर2018 April2018 to October2018
उततरी कषतर Northern Region
चडीगढ़ Chandigarh Data not received Data not received
दिलली Delhi Data not received Data not received
हरियजणज Haryana 940 hrsday 0709 - 0950 hrsday
दहमजचल परिश Himachal Pradesh No cut imposed on agriculture consumers and uninterrupted
power is being supplied to agriculture sector
HPSEBL has only 2 agriculture consumers and uninterrupted
power is being supplied to agriculture sector
रमम कशमीि Jammu amp Kashmir Data not received Data not received
परजब Punjab 0507 hrsday 0349 - 0844 hrsday
िजरसथजन Rajasthan 0630 hrsday 0630 hrsday
उतति परिश Uttar Pradesh 1825 hrsday 1814 - 1858 hrsday
उततिजखड Uttarakhand 2350 hrsday 2128 - 2357 hrsday
पशचिमी कषतर Western Region
छततीसगढ़ Chhattisgarh 18hoursday 18 hrsday
गरिजत Gujarat 805 hrsday 805 hrsday
मधय परिश Madhya Pradesh Three-Phase Supply(Irrigation)-947 hrs day
Three-Phase (Mixed) Supply - 2311 hrs day
Three-Phase Supply(Irrigation)- 0933 - 0947 hrs day Three-
Phase (Mixed) Supply - 2300 - 2320 hrs day
महजिजषटर Maharashtra Three-Phase Supply(Irrigation)- 9 hrs day
Three-Phase (Mixed) Supply - 24 hrs day
Three-Phase Supply(Irrigation)- 9 hrs day
Three-Phase (Mixed) Supply - 24 hrs day
गोवज Goa No restriction No restriction
दकषकषणी कषतर Southern Region
आनधर परिश Andhra Pradesh 07 hrsday 07 hrsday
तलगजनज Telangana 24 hoursday 24 hoursday
कनजाटक Karnataka 6 hrsday 6 hrsday
किल Kerala No Restrictions No Restrictions
तममल नजड Tamil Nadu 9 hrsday (6 hrs during day time and 3 hrs during night time) 9 hrsday (6 hrs during day time and 3 hrs during night time)
पडचिी Puducherry No Restrictions No Restrictions
परवी कषतर Eastern Region
बबहजि Bihar About 18 hrsday About 18 hrsday
झजिखणड Jharkhand About 20 hrsday About 20 hrsday
ओडडशज Odisha 24 hrsday 24 hrsday
पशशचम बगजल West Bengal About 23 hrsday About 23 hrsday
28
अकटबर 2018 कषि कषतर को षिदयत आपरति का षििरण Power Supply to Agricultural Sector during October2018
राजय कषतर State Regionऔसत वरवदयत आपरतण घनरो म Average Hours of Supply
On segregated feeders
File NoCEA-CH-14-1142018-Coordination Division
SNo Contents Page
1 Growth of Installed Capacity since 6th Plan 29
2 Progress of Transmission Sector since 6th Plan 30
3 All India Yearly Coal consumption for Power Generation (Utilities)
4 All India Annual Per Capita Consumption of Electricity since -2006
5 Average cost of power supply amp Average realisation (Paisakwh)
6 Growth of Rural Electrification amp Pump Sets Energisation
7 Status of Hydro Schemes Cleared by the CEA in Oct-2018
Section G - Growth of Power Sector
31
32
File NoCEA-CH-14-1142018-Coordination Division
(In MW)
Coal Gas Diesel Total
End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472
End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634
End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537
End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596
End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921
End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703
End of 12th Plan 19216288 2532938 83763 21832988 6780 4447842 50018 31960630
Up to Oct-2018 19599250 2493722 837629 22176734 6780 4548742 7201281 34604757
Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-17) = 51529 MW
Electricity Generation (MU) Targets and Achievements for 2016-17
Coal Gas Diesel Nuclear Hydro Res Total
1959925 2493722 837629 678000 454874 72012805 22925174
29
1 Growth of Installed Capacity Since 6th Plan
Plan YearThermal
Nuclear Hydro RES (MNRE) Total
Total Installed Capacity 34604757 MW
Coal Gas Diesel Nuclear Hydro Res
File NoCEA-CH-14-1142018-Coordination Division
Progress of Transmission Sector in the Country up to Oct 2018
1 TRANSMISSION LINES (All fig in CKM)
At the end of
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
6th plan 0 0 0 0 0 0 0 0 0 0 0 0 1831 4198 0 6029 1641 44364 0 46005 3472 48562 0 52034
7th plan 0 0 0 0 0 0 0 0 0 0 0 0 13068 6756 0 19824 4560 55071 0 59631 17628 61827 0 79455
8th plan 0 0 0 0 1634 0 0 1634 0 0 0 0 23001 13141 0 36142 6564 73036 0 79600 31199 86177 0 117376
9th plan 0 0 0 0 3234 1504 0 4738 751 409 0 1160 29345 20033 0 49378 8687 88306 0 96993 42017 110252 0 152269
10th plan 0 0 0 0 4368 1504 0 5872 1775 409 0 2184 48708 24730 0 73438 9444 105185 0 114629 64295 131828 0 196123
11th Plan 0 0 0 0 5948 1504 1980 9432 4839 411 0 5250 71023 30191 5605 106819 10140 125010 830 135980 91950 157116 8415 257481
12th Plan 6124 0 0 6124 5948 1504 1980 9432 25465 1177 4598 31240 92482 48240 17065 157787 11014 151276 978 163268 141033 202197 24621 367851
13th Plan (Up
to Mar2018)6124 0 0 6124 5948 1504 1980 9432 28666 1512 4881 35059 98247 54286 19067 171600 11258 156497 1000 168755 150243 213799 26928 390970
13th Plan (Up
to Sep-18)6124 0 0 6124 5948 1504 1980 9432 30952 1512 5059 37523 99683 56069 20662 176414 11318 160958 1000 173276 154025 220043 28701 402769
27150
75050
47900
118050
90650
30
IR addition in 12th Plan (up to
March 2017)
Total IR (up to Oct-18)
IR at the end of 11th Plan
IR at the end of 12th Plan
Envisaged IR Capacity at the end
of 13th Plan
Grand Total
Note - The figure upto the end of 10th plan in for stringing progress including the lines not commissioned Now only commissioned lines are reckoned Accordingly the figure for 10th plan (end) may read as 187555 after adjusting with (-) 10852 Ckm
Inter-regional Power Transfer Capacity
plusmn 800 kV HVDC plusmn 500 kV HVDC 765 kV 400 kV 220 kV
File NoCEA-CH-14-1142018-Coordination Division
2004-05 27800
2005-06 28100
2006-07 30200
2007-08 33000
2008-09 35500
2009-10 36700
2010-11 38700
2011-12 41756
2012-13 45460
2013-14 48940
2014-15 53040
2015-16 54590
2016-17 57430
2017-18 60800
Year
2005-06
2006-07
2007-08
2008-09
2009-10
2010-11
2011-12
2012-13
2013-14
2014-15
2015-16
2016-17
2017-18
2004-05 254 209 7568
2005-06 260 221 7636
2006-07 276 227 7423
2007-08 293 239 7727
2008-09 340 263 8713
2009-10 355 268 8870
2010-11 398 303 11975
2011-12 455 330 13514
2012-13 501 376 14867
2013-14 518 175
2014-15 520
6719
7171
3 All India yearly Coal Consumption for Power Generation (Utilities)
YEARCoal Consumption
Million Tonnes
4 All India Annual per Capita consumption of Electricity Since 2006
Per Capita Consumption ( kWh)
6314
(GrossGen+ Net Import) Mid-year population
5 Average cost of power supply amp average realization ( paiseKWH )
Yearcost of supply
(paiseunit)
Realization(paiseunit)
Including AgricultureOnly
Agriculture
1149
7335
7786
91441
8188
88363
957
1010
1075
1122
File NoCEA-CH-14-1142018-Coordination Division
Source- PFC Reports on the performance of State Power Utilities 31
File NoCEA-CH-14-1142018-Coordination Division
Sl
NoExecuting Agency
Installed
Capacity (MW)Cost (Rs crore)
Date of
Clearance
32
No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification
since 2004-05
65291374575 296361511th Plan
Cumu upto End of 11th Plan
596556 21212860
557439Cummulative up to end of 12th Plan
46708
18423975
499150
2003-042004-05
5743
9769
Cumu upto End of 10th Plan
010407 to 310308
010410 to 310311557976840909
010411 to 310312
412667
86293726
3207
482864
12632
1576036
4451722594
15455554
2314176
397343611750
2093311060316074
65109527813884
6 Growth Of Rural Electrification amp Pumpsets Energisation
Plan Year
9th Plan2002-03
134092626
4111
Pump Sets Energised Villages Electricfied (Nos)
2001-02
284064367244
1218
27801997-981998-991999-002000-01
297594
010408 to 310309010409 to 310310
10th Plan
2005-062006-07
322968331020
Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as
Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received
from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made
available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified
villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is
independent of the earlier published reports
No Hydro Electric Project has been issued concurrenceAppraisal letter by CEA during October 2018
7 Status of Hydro Schemes Cleared by the CEA in Oct-2018
Name of Scheme
File NoCEA-CH-14-1142018-Coordination Division
SN Contents Page
1 Rate of sale of power for the year 2016-17 33-41
RATE OF SALE OF POWER FOR THE YEAR 2016-17
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) NORTHERN REGION
CENTRAL SECTOR
BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 18000 66900 19800
CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 54000 222400 21600
CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 30000 144400 19600
CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 23100 91700 42600
PARBATI - III HPS NHPC LTD HYDRO-HYDRO 52000 68200 54800
DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 28000 95600 30000
CHUTAK NHPC LTD HYDRO-HYDRO 4400 22000 79800
DULHASTI HPS NHPC LTD HYDRO-HYDRO 39000 228000 56400
SALAL HPS NHPC LTD HYDRO-HYDRO 69000 342300 11000
TANAKPUR HPS NHPC LTD HYDRO-HYDRO 9420 43000 29600
URI HPS -I NHPC LTD HYDRO-HYDRO 48000 280300 16000
URI HPS - II NHPC LTD HYDRO-HYDRO 24000 147300 48600
NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 4500 24600 88200
SEWA - II NHPC LTD HYDRO-HYDRO 12000 47100 43400
ANTA CCPP NTPC LTD THERMAL-GASN 41930 67539 32400
AURAIYA CCPP NTPC LTD THERMAL-GASN 66336 53501 39100
BADARPUR TPS NTPC LTD THERMAL-COAL 70500 159153 44800
DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 84000 296170 42300
DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 98000 526686 46300
DADRI CCPP NTPC LTD THERMAL-GASHSD 82978 227469 33000
FARIDABAD CCPP NTPC LTD THERMAL-GASN 43159 115577 30800
RIHAND STPS I NTPC LTD THERMAL-COAL 100000 596766 24500
RIHAND STPS II NTPC LTD THERMAL-COAL 100000 737069 24600
RIHAND STPS III NTPC LTD THERMAL-COAL 100000 706546 30600
SINGRAULI STPS NTPC LTD THERMAL-COAL 200000 1394068 20400
TANDA TPS NTPC LTD THERMAL-COAL 44000 295438 40800
UNCHAHAR TPS I NTPC LTD THERMAL-COAL 42000 256454 39800
UNCHAHAR TPS II NTPC LTD THERMAL-COAL 42000 273577 38900
UNCHAHAR TPS III NTPC LTD THERMAL-COAL 21000 142780 43000
KOLDAM NTPC LTD HYDRO-HYDRO 80000 363260 43600
NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 303575 25841
RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 108000 668677 35374
NJHPS SJVNL HYDRO-HYDRO 150000 699496 23820
RAMPUR HPS SJVNL HYDRO-HYDRO 41202 195982 32260
TEHRI HPP THDC HYDRO-HYDRO 100000 272543 51800
KOTESHWAR HEP THDC HYDRO-HYDRO 40000 106244 53400
IGSTPS JHAJJAR ARAVALI P CPL THERMAL-COAL 150000 510429 49490
NEYVELI BARSINGSAR NEYVELI LIG CORP LTD THERMAL-LIG 25000 127520 38040
STATE SECTOR
PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 21000 14222 48200
PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 21000 19205 48400
PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 25000 102257 42600
PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 25000 62107 41800
DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 60000 312213 41000
RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 120000 35767442200
WYC HYDEL STATION HPGCL HYDRO-HYDRO 6240 20365 24900
GIRI POWER HOUSE HPSEB HYDRO-HYDRO 6000 13958 7600
ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 1695 5467 11900
BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 12000 18528 6700
GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 2250 7462 22500
BASSI POWER HOUSE HPSEB HYDRO-HYDRO 6600 29649 7500
BINWA POWER HOUSE HPSEB HYDRO-HYDRO 600 2749 19300
ANNEXURE-I
RATE OF SALE OF POWER FOR THE YEAR 2016-2017
Page 33
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) GAJ POWER HOUSE HPSEB HYDRO-HYDRO 1050 2914 26700
BANER POWER HOUSE HPSEB HYDRO-HYDRO 1200 2864 16200
HOLI POWER HOUSE HPSEB HYDRO-HYDRO 300 616 22500
THIROT POWER HOUSE HPSEB HYDRO-HYDRO 450 1126 22500
KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 1200 3064 22500
LARJI POWER HOUSE HPSEB HYDRO-HYDRO 12600 53677 23700
NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 250 750 31000
CHABA POWER HOUSE HPSEB HYDRO-HYDRO 175 465 23300
RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 150 101 13400
SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 200 000 22500
KILLAR HPSEB HYDRO-HYDRO 030 050 22500
BHABA AUGUMENP H HPSEB HYDRO-HYDRO 450 1276 22500
BS CHAMBA HPSEB HYDRO-HYDRO 045 099 19500
GUMMA HPSEB HYDRO-HYDRO 300 423 22500
GAS TURBINE POWER STATION IPGCL THERMAL-GAS 27000 67233 39300
PPS-I PPCL THERMAL-GAS 33000 175905 38300
PPS-III PPCL THERMAL-GAS 137120 196879 36100
LOWER JHELUM JampKPDD HYDRO-HYDRO 10500 60214 5100
UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 2260 10514 6300
UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 10500 44202 8500
GANDHARBAL JampKPDD HYDRO-HYDRO 1500 8925 4700
KARNAH MPH JampKPDD HYDRO-HYDRO 200 1122 31000
CHENANI I JampKPDD HYDRO-HYDRO 2330 10892 6600
CHENANI II JampKPDD HYDRO-HYDRO 200 1188 9300
CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 750 3634 14200
IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 375 2108 18500
IGO MERCHELLONG JampKPDD HYDRO-HYDRO 300 1572 29700
PAHALGAM MHP JampKPDD HYDRO-HYDRO 450 1713 32900
MARPACHOO JampKPDD HYDRO-HYDRO 075 375 29800
HAFTAL JampKPDD HYDRO-HYDRO 100 483 28700
SANJAK JampKPDD HYDRO-HYDRO 126 441 36000
SEWA-III JampKPDD HYDRO-HYDRO 900 3273 20200
BHADERWAH JampKPDD HYDRO-HYDRO 150 935 8900
BAZGO JampKPDD HYDRO-HYDRO 030 108 33300
SUMOOR JampKPDD HYDRO-HYDRO 010 045 35400
HUNDER JampKPDD HYDRO-HYDRO 040 176 26200
STAKNA JampKPDD HYDRO-HYDRO 400 1933 4100
KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 124000 662879 31360
SURATGARH TPS RRVUNL THERMAL-COAL 150000 402328 41730
CHHABRA TPS 1amp 2 RRVUNL THERMAL-COAL 50000 305946 36700
CHHABRA TPS 3 RRVUNL THERMAL-COAL 25000 151536 36700
CHHABRA TPS 4 RRVUNL THERMAL-COAL 25000 155896 36700
RAMGARH GT POWER PROJECT RRVUNL THERMAL-COAL 22050 43177 41800
RAMGARH GAS T P PROJECT 3 RRVUNL THERMAL-GAS 5000 93615 41800
DHOLPUR C C POWER PROJECT RRVUNL THERMAL-R-LNG 33000 9486 46110
MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 14000 20855 34192
MINI MICRO HYDEL (MMH) P S RRVUNL HYDRO-HYDRO 2385 851 37800
KALISINDH TPP 1 RRVUNL THERMAL-COAL 60000 341543 45000
KALISINDH TPP 2 RRVUNL THERMAL-COAL 60000 211588 45000
KHARA HEP UPJVNL HYDRO-HYDRO 7200 26654 7200
MATATILLA HEP UPJVNL HYDRO-HYDRO 3060 12219 6500
OBRA HEP UPJVNL HYDRO-HYDRO 9900 21517 6300
RIHAND UPJVNL HYDRO-HYDRO 30000 57369 5500
ANPARA A TPS UPRVUNL THERMAL-COAL 63000 317536 27000
ANPARA B TPS UPRVUNL THERMAL-COAL 100000 705605 22700
ANPARA D UPRVUNL THERMAL-COAL 100000 300158 39800
HARDUAGANJ TPS UPRVUNL THERMAL-COAL 16500 45817 49200
HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 50000 304389 46600
OBRA A TPS UPRVUNL THERMAL-COAL 28800 13158 34000
OBRA B TPS UPRVUNL THERMAL-COAL 100000 328124 21900
Page 34
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) PANKI TPS UPRVUNL THERMAL-COAL 21000 66488 50300
PARICHHA TPS UPRVUNL THERMAL-COAL 22000 38762 49400
PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 42000 231931 45600
PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 50000 276722 50400
CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 24000 70845 8290
CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 14400 75366 8390
DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 3375 9595 12080
DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 5100 18701 10520
KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4140 17359 12330
KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 12000 33001 9420
KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 3000 11953 8320
TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 9000 33983 12460
MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 30400 124510 16110
RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 19800 17897 10550
MPUR UTTARAKHAND JVNL HYDRO-HYDRO 930 5121 19200
PATHRI UTTARAKHAND JVNL HYDRO-HYDRO 2040 11636 14200
GALOGI UTTARAKHAND JVNL HYDRO-HYDRO 300 648 12500
PRIVATE SECTOR
MGTPP CLP INDIA PVT LTD THERMAL-COAL 132000 268902 41940
SHRINAGAR HEP ALAKNANDA HPCL HYDRO-HYDRO 33000 127414 48800
GAMA INFRAPROP CCPP GAMA INFRAPROP PVT THERMAL-GAS 22500 52686 47000
PPGCL (BARA) JP POWER VENTURES LTD THERMAL-COAL 198000 448200 38500
MALANA HEP MALANA PCL HYDRO-HYDRO 8600 26354 29792
MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 10000 30369 32580
ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 19200 56347 36079
KASHANG HEP H P PCL HYDRO-HYDRO 19500 5034 29200
BASPA-II HEP HBPCL HYDRO-HYDRO 30000 132769 13600
KARCHAM WANGTOO HEP HBPCL HYDRO-HYDRO 100000 434386 36600
RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 108000 582600 43700
RITHALA COMBI CY POWER PLANT TATA POWER DDL THERMAL-GAS 9480 000 11900
RAJPURA TPS NABHA POWER LTD THERMAL-GAS 140000 901484 39000
TALWANDI SABO POWER LTD TALWANDI SABO POWER LTD THERMAL-COAL 198000 636040 49548
ROJA THERMAL POWER STATION ROJA POWER SCL THERMAL-COAL 120000 727200 43400
KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 34400 63400
BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 36000 62600
MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 38200 60800
UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 37900 61500
KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 42300 58800
LALITPUR PGCL BAJAJ ENERGY PVT LTD THERMAL-COAL 198000 359400 47300
PRAYAGRAJ PGCL PRAYAGRAJ PGCL THERMAL-COAL 132000 448200 38595
KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 132000 783182 33438
WESTERN REGION
CENTRAL SECTOR
INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 100000 325333 23892
OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 52000 141663 34001
GANDHAR CCPP NTPC LTD THERMAL-GAS 65739 221924 28700
KAWAS CCPP NTPC LTD THERMAL-GASN 65620 167929 27000
KORBA I amp II NTPC LTD THERMAL-COAL 210000 1499171 20500
KORBA III NTPC LTD THERMAL-COAL 50000 358746 26600
SIPAT STPS I NTPC LTD THERMAL-COAL 198000 1479902 26800
SIPAT STPS II NTPC LTD THERMAL-COAL 100000 766549 26500
VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 126000 693142 25800
VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 100000 608781 23800
VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 100000 673475 27600
VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 100000 655924 32900
VINDHYACHAL STPS V NTPC LTD THERMAL-COAL 50000 328265 31700
MOUDA I NTPC LTD THERMAL-COAL 100000 343130 44500
MOUDA Ii NTPC LTD THERMAL-COAL 66000 40637 39900
RATNAGIRI GAS amp POWER PVT LTD RGPPL THERMAL-GAS 196708 442485 47000
KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 000 24729
TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 32000 201227 10740
Page 35
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 365122 19069
TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 787444 29324
STATE SECTOR
GSEG-HAZIRA15610 MW GUJARAT S ENEGEN LTD THERMAL-GAS 15610 1805 28200
GSEG-HAZIRA35143 MW GUJARAT S ENEGEN LTD THERMAL-GAS 35130 22276 51300
GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 21978 51800
AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 13929 26100
KORBA TPS EAST CSPGCL THERMAL-COAL 44000 198673 33880
DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 365808 27570
KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 316500 30420
HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 532878 19410
CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 515 58300
MTTPS CHAMPA U-I CSPGCL THERMAL-COAL 50000 220376 39000
MTTPS CHAMPA U-II CSPGCL THERMAL-COAL 50000 23709 10000
SHP GANGREL CSPGCL HYDRO-HYDRO 1000 2350 36790
BANGO HEP CSPGCL HYDRO-HYDRO 12000 14662 8900
MHP KORBA WEST CSPGCL HYDRO-HYDRO 170 859 38190
SIKASAR HEP CSPGCL HYDRO-HYDRO 700 418 26870
DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8843 74500
DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 19446 51500
GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 66388 71600
GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127488 41300
KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 96072 43900
KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 29841 56400
SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 184966 58800
UKAI 1-5 GSECL THERMAL-COAL 85000 204891 46900
UKAI TPS 6 GSECL THERMAL-COAL 50000 284448 48200
WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 271999 58300
WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 82808 44100
KADANA HPS GSECL HYDRO-HYDRO 24200 34433 16800
UKAI HPS GSECL HYDRO-HYDRO 30500 40585 6100
TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 123000 11500
BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 8900 10900
BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 7200 27500
JHINNA HPS MPPGCL HYDRO-HYDRO 2000 9700 18500
RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 44300 3400
GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 17300 4600
SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 4100 16900
MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 14600 27000
PENCH HPS MPPGCL HYDRO-HYDRO 16000 23700 8100
RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 3000 16900
AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 134400 35100
SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 283800 38700
SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 344600 34300
SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 111600 61600
SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 211800 58000
SSTPS PH-I MPPGCL THERMAL-COAL 120000 233100 84300
BHUSAWAL TPS MSPGCL THERMAL-COAL 142000 566258 51100
CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1365682 33700
KHAPERKHEDA MSPGCL THERMAL-COAL 134000 706207 39100
KORADI TPS MSPGCL THERMAL-COAL 62000 443206 42000
NASIK TPS MSPGCL THERMAL-COAL 63000 297275 47000
PARLI TPS MSPGCL THERMAL-COAL 113000 175934 71600
PARAS MSPGCL THERMAL-COAL 50000 267931 38700
URAN CCPP MSPGCL THERMAL-GAS 67200 320330 30600
KOYANA MSPGCL HYDRO-HYDRO 195600 328155 13100
SMALL HYDRO POWER PLANTS MSPGCL HYDRO-HYDRO 45400 93062 30500
BHIRA MSPGCL HYDRO-HYDRO 8000 10046 8400
TILLARI MSPGCL HYDRO-HYDRO 8900 10584 3100
SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 233298 20500
SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 87633 20500
PRIVATE SECTOR
Page 36
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 81282 46750
JNSTPP(JAYPEE NIGRIE) JP POWER VENTURES LTD THERMAL-COAL 132000 726695 29310
MB POWER MB POWER THERMAL-COAL 120000 345632 38310
ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 754922 28671
ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 780761 23495
ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 198000 1263784 32090
ADANI POWER MAHARA ADANI POWER LTD THERMAL-COAL 330000 1666191 34124
AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 170065 36827
SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 252035 45129
ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 458551 36000
ESSAR POWER MP LTD ESSAR POWER MP LTD THERMAL-COAL 60000 243040 28600
VEDANTA LTD (P P -I) VEDANTA LTD THERMAL-GAS 3000 15044 24000
VEDANTA LTD (P P -II) VEDANTA LTD THERMAL-GAS 3000 21293 24000
PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 8234600 24000
165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 5850 64390
145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 68717 40349
SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 132655 28776
SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 144686 38567
MUNDRA UMPPCOASTAL GUJARAT POWER
LTD THERMAL-IMP COAL 400000 2530300
23900
LANCO AMARKANTAK TPP PATHADIH
U-ILANCO AMARKAN POWER LTD THERMAL-COAL 30000 195500
29200
LANCO AMARKANTAK TPP PATHADIH
U-IILANCO AMARKAN POWER LTD THERMAL-COAL 30000 206900
27600
BARADARHA TPS D B POWER LTD THERMAL-COAL 120000 677373 29200
JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 405000 28900
JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 453000 40500
DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 339437 40700
TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 293400 44000
TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 137200 37000
TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 174900 44000
BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 92900 14100
BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23700 34300
KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 27600 48300
CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2530300 23900
BHANDARDRA HEP -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 2475 54900
SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 161400 26500
SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 445000 39000
SOTHERN REGION
CENTRAL SECTOR
NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 325699 54820
NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 305532 39880
NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 998805 38510
NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 113016 54070
NEYVELI TAMILNADU POWER LTD JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 625274 42200
VALLUR TPS NTPC TECL THERMAL-COAL 150000 856438 42350
R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 1493 84300
RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1502919 29400
RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 341291 31800
SIMHADRI I NTPC LTD THERMAL-COAL 100000 688382 36800
SIMHADRI II NTPC LTD THERMAL-COAL 100000 663657 43400
KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 593110 31324
MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 291625 21764
KKNPP-1 amp 2 NPCIL NUCLEAR-NUCLEAR 200000 572609 40948
MINICOY LAKSHADEEP THERMAL-DIESEL 340 770 29600
KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1097 29600
AMINI LAKSHADEEP THERMAL-DIESEL 265 509 29600
ANDROTT LAKSHADEEP THERMAL-DIESEL 219 524 29600
KALPENI LAKSHADEEP THERMAL-DIESEL 175 356 29600
AGATTI LAKSHADEEP THERMAL-DIESEL 195 658 29600
KADMAT LAKSHADEEP THERMAL-DIESEL 190 414 29600
KILTAN LAKSHADEEP THERMAL-DIESEL 150 269 29600
CHETLET LAKSHADEEP THERMAL-DIESEL 100 139 29600
BITRA LAKSHADEEP THERMAL-DIESEL 043 024 29600
BANGARAM LAKSHADEEP THERMAL-DIESEL 018 009 29600
Page 37
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) STATE SECTOR
Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 721811 46500
Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 50000 336142 46500
RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 237358 46500
RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 239926 46500
RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 124500 46500
SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 62109 46500
UPPER SILERU APGENCO HYDRO-HYDRO 24000 33000 46500
LOWER SILERU APGENCO HYDRO-HYDRO 46000 81066 46500
DONKARAI APGENCO HYDRO-HYDRO 2500 6007 46500
PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 1262 46500
CHETTIPETA APGENCO HYDRO-HYDRO 100 214 46500
MUCHKUND APGENCO HYDRO-HYDRO 12000 37571 46500
NAGARJUNASAGAR RCPH APGENCO HYDRO-HYDRO 9000 606 46500
TUNGABHADRA HES amp HAMPI(AP
Share)
APGENCO HYDRO-HYDRO 7200 6100 46500
KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 352232 42600
KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 288131 32500
KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 319272 46500
RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 40073 44300
KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 308317 46000
KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 308963 51300
SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 61004 76600
NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 17960 75300
PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 20873 58300
POCHAMPAD-I TSPGENCO HYDRO-HYDRO 2700 5455 29800
POCHAMPAD-II TSPGENCO HYDRO-HYDRO 900 1932 40700
NIZAMSAGAR TSPGENCO HYDRO-HYDRO 1000 1126 53400
RAICHUR TPS 1 to 7 KPCL THERMAL-COAL 147000 890866 43800
RAICHUR TPS 8 KPCL THERMAL-COAL 25000 159523 48200
BELLARI TPS 1 KPCL THERMAL-COAL 50000 318679 51100
BELLARI TPS 2 KPCL THERMAL-COAL 50000 232347 55600
BELLARI TPS 3 KPCL THERMAL-COAL 70000 47565 34400
BHADRA PH KPCL HYDRO-HYDRO 3920 2369 45900
GERUSUPPA PH KPCL HYDRO-HYDRO 24000 26990 22000
GHAT PRABHA HEP KPCL HYDRO-HYDRO 3200 4777 25300
KADRA HPS KPCL HYDRO-HYDRO 15000 16889 26800
NAGJHARI KPCL HYDRO-HYDRO 90000 155159 9800
KODASALLI DPH KPCL HYDRO-HYDRO 12000 14854 19200
MUNIRA+MGH+SPH+SPH KPCL HYDRO-HYDRO 22640 48211 7900
SHARAVATHY HPS KPCL HYDRO-HYDRO 108550 276215 5400
ALMATTI DPH KPCL HYDRO-HYDRO 29000 39611 24600
VARAHI UGPH KPCL HYDRO-HYDRO 46000 71368 15600
IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 17196 15300
IDUKKI HPS KSEB HYDRO-HYDRO 78000 137905 15300
KAKKAD HPS KSEB HYDRO-HYDRO 5000 13063 15300
KALLADA HPS KSEB HYDRO-HYDRO 1500 4436 15300
KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 46544 15300
KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 635 15300
LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 30822 15300
MALANKARA HPS KSEB HYDRO-HYDRO 1050 2474 15300
MATTUPETTY KSEB HYDRO-HYDRO 200 230 15300
MALAMPUZHA KSEB HYDRO-HYDRO 250 063 15300
CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 864 15300
URUMI ST I amp II KSEB HYDRO-HYDRO 615 903 15300
LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 248 15300
NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7765 19625 15300
PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 16601 15300
PANNIAR HPS KSEB HYDRO-HYDRO 3240 6217 15300
PORINGALKUTHU KSEB HYDRO-HYDRO 3600 10052 15300
PORINGALKUTHU LBE KSEB HYDRO-HYDRO 1600 9438 15300
PEPPARA KSEB HYDRO-HYDRO 300 395 15300
POOZHITHODE KSEB HYDRO-HYDRO 480 1045 15300
Page 38
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) PEECHI KSEB HYDRO-HYDRO 125 040 15300
RANI-PERUNADU KSEB HYDRO-HYDRO 400 585 15300
SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 79783 15300
SENGULAM HPS KSEB HYDRO-HYDRO 5120 11558 15300
SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 16711 15300
VILANGAD KSEB HYDRO-HYDRO 750 1578 15300
BARAPOLE KSEB HYDRO-HYDRO 1500 1932 15300
VELLATHOOVAL KSEB HYDRO-HYDRO 360 305 15300
CHIM0NY KSEB HYDRO-HYDRO 250 156 15300
ADYANPARA KSEB HYDRO-HYDRO 350 501 15300
BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 554 15300
KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 3801 15300
KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 23132 32800
ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 14416 62280
METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 523970 62280
METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 321270 62280
NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 336575 62280
NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 591240 62280
TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 508966 62280
KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 30897 62280
VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 18720 90699 62280
KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 33593 62280
BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 1047 62280
PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 1250 62280
PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 330 62280
MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 4897 62280
MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 032 62280
KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15681 62280
KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 40608 62280
KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 21342 62280
KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 4717 62280
KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4322 62280
KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2399 62280
METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 4416 62280
METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 8035 62280
BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2187 62280
BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2359 62280
BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2511 62280
BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 1949 62280
BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 1819 62280
POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 172 62280
SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 241 62280
MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 026 62280
THIRUMOORTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 136 62280
PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 9309 62280
VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 353 62280
SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 4192 62280
PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 6571 62280
SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 1186 62280
SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6319 62280
ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 6122 62280
KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 28674 62280
SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 18381 62280
SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 4258 62280
KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 12680 62280
KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4201 62280
ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 000 62280
PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 19175 62280
AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 078 62280
BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 504 62280
BHAVANI KATTALAI (BKB)(IIIampIII BB I amp II)TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 5847 62280
PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 000 62280
Page 39
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) SRI DAMODARAM STPS APPDCL THERMAL-COAL 160000 808108 36300
PRIVATE SECTOR
KARUPPUR TANJORE LANCO TANJORE PCL THERMAL-GAS 12000 48096 28770
SIMHAPURI ENERGY LTD SIMHAPURI ENERGY LTD THERMAL-COAL 60000 143900 39100
JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 7111 45500
SBU 1 JSW ENERGY LTD
VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 26000 159100
43300
SBU 2 JSW ENERGY LTD
VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 60000 247900
42800
LANCO KPLLANCO KONDAPALLI POWER
LTDTHERMAL-GAS 36814 85060
25776
LANCO KPL STG -IILANCO KONDAPALLI POWER
LTDTHERMAL-GAS 36600 12979
46330
LANCO KPL STG -IIIALANCO KONDAPALLI POWER
LTDTHERMAL-GAS 37100 85710
46330
LANCO KPL STG -III BLANCO KONDAPALLI POWER
LTDTHERMAL-GAS 37100 43639
46330
HINDUJA NATIONAL PCL HINDUJA NATIONAL PCL THERMAL-COAL 104000 303000 38200
MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 121164 49940
UDUPI POWER COR LTD ADANI POWER LTD THERMAL-COAL 120000 754613 42500
SPECTRUM POWER GENERATION
LTD SPECTRUM PG LTD THERMAL-GASN 20525 9256812
34952
TAQA NEYVELI POWER COM PVT
LTD TAQA NEYVELI THERMAL-LIG 25000 5840
34500
ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 251000 51000
ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 207860 36800
GMR VEMAGIRI POWER GENERATION
LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 30117
46450
EASTERN REGION
CENTRAL SECTOR
MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 64675 53113
MTPS STAGE - II KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 39000 1432 69138
BOKARO `B` TPS DVC THERMAL-COAL 63000 145670 31539
MEJIA TPS U 1-3 DVC THERMAL-COAL 63000 348298 31552
MEJIA TPS U 4 DVC THERMAL-COAL 21000 116099 34997
MEJIA TPS U 5-6 DVC THERMAL-COAL 50000 276427 35976
MEJIA TPS U 7-8 DVC THERMAL-COAL 100000 552854 36991
DURGAPUR STEEL TPS DVC THERMAL-COAL 100000 665550 39323
DURGAPUR TPS DVC THERMAL-COAL 21000 59270 35416
RAGHUNATHPUR TPS DVC THERMAL-COAL 120000 201650 35326
MAITHON HYDEL STA DVC HYDRO-HYDRO 6320 12200 17984
CHANDRAPURA TPSU1-3 DVC THERMAL-COAL 42000 257610 35095
CHANDRAPURA TPSU7-8 DVC THERMAL-COAL 50000 306673 34987
KODERMA TPS DVC THERMAL-COAL 100000 380180 38131
PANCHET HPS DVC HYDRO-HYDRO 8000 13360 17984
TILLAYA HPS DVC HYDRO-HYDRO 400 1410 17984
RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34700 35400
TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 277300 23200
TLDP -III NHPC LTD HYDRO-HYDRO 13200 55400 62000
TLDP -IV NHPC LTD HYDRO-HYDRO 16000 60300 25600
FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 957219 33700
FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 308943 41000
BONGAINGAON TPS NTPC LTD THERMAL-COAL 25000 153663 58600
KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 542277 34200
KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 942591 34200
BARH-II NTPC LTD THERMAL-COAL 132000 728021 44500
TALCHER TPS NTPC LTD THERMAL-COAL 46000 335521 30100
TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 702319 25600
TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1436521 24700
STATE SECTOR
BTPS(RampM) BIHAR STATE PGCL THERMAL-COAL 22000 12142 39700
BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 98331 10602
HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 50593 9482
CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 19689 2605
RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 53192 6033
UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 147208 14637
Page 40
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 60353 4519
IB TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 288567 25000
J P H GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 210 038 61100
MEYONG CHU GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 400 1086 61100
TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 122667 38200
DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 214339 43321
KOLAGHAT THERMAL POWER
STATION
WEST BENGAL PDCL THERMAL-COAL 126000 538269 31603
BAKRESHWAR THERMAL POWER
PLANT
WEST BENGAL PDCL THERMAL-COAL 105000 634876 32154
BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 45000 166855 33299
SANTHALDIH THERMAL POWER
STATION
WEST BENGAL PDCL THERMAL-COAL 50000 336442 34932
SAGARDIGHI THERMAL POWER
PROJECT
WEST BENGAL PDCL THERMAL-COAL 160000 423121 34705
JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 20344 68900
RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 24559 68900
TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 4623 68900
PURULIA PUMPED STORAGE
PROJECT
WEST BENGAL SEDCL HYDRO-HYDRO 90000 108816 68900
MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2768 68900
PRIVATE SECTOR
CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 49474 20230
CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 555500 70200
HALDIA ENERGY HALDIA ENERGY LTD THERMAL-COAL 60000 371000 50400
DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3688 63400
KAMALANGA TPS GMR KAMALANGA ENERGY LTD THERMAL-COAL 105000547670
33300
ADHUNIK POWER U-1 ADHUNIK POWER THERMAL-COAL 27000 158 44060
ADHUNIK POWER U-2 ADHUNIK POWER THERMAL-COAL 27000 168 44250
VL-JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 332800 23622
JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 43000 45250
JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 71700 37030
JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 70700 35920
JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 71100 38870
JOJOBERA UNIT 5 TATA POWER COM LTD THERMAL-COAL 12000 79300 44560
JOJOBERA UNIT 6 TATA POWER COM LTD THERMAL-WHR 12000 83700 12840
IEL KALINGANAGAR U-I TATA POWER COM LTD THERMAL-WG 6750 33400 22500
IEL KALINGANAGAR U-II TATA POWER COM LTD THERMAL-WG 6750 34800 22500
MAITHON UNIT 1 amp 2 TATA POWER COM LTD THERMAL-COAL 105000 678000 36100
HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 27500 24340
HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 28400 24340
HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 15800 24310
NORTH EASTERN REGION
CENTRAL SECTOR
LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 74100 36600
AGARTALA GT NEEPCO THERMAL-GAS 13500 88611 27210
ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 153111 32310
DOYANG HEP NEEPCO HYDRO-HYDRO 7500 25598 49801
KOPILI HEP NEEPCO HYDRO-HYDRO 20000 98186 11491
KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 19582 20237
KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 10310 17968
RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 124093 22945
TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 10100 17344 39000
STATE SECTOR
HYDRO POWER (122 Stns) ITANAGAR GOVT OF ARUNACHAL
PRADESHHYDRO-HYDRO 6971 6217270
24600
KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39514 17337
LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 82327 36810
NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 33318 48290
MYNTRIANG SHEP ST II ASSAM POWER GENCO HYDRO-HYDRO 300 567 35776
LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 9130 49200
LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 012 49200
DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 022 49200
TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 000 49200
UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 4990 16000
UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 6476 37000
UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 16494 14600
UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 3600 9556 15000
SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 758 8000
MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44070 44800
KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 154 41400
TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 091 41400
MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 411 41400
MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 394 41400
KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 760 41400
SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 3264 41400
LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 044 41400
BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 18953 28000
ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 43585 28200
GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 4080 11100
Note
LIG Lignite N Naptha WHR Waste Heat Recovery
Page 41
File NoCEA-CH-14-1142018-Coordination Division
SN Section A - Highlights of Power Sector Page
1 Electricity Generation for Oct-2018 (BU) 1A amp 1B
2 Generating Capacity Addition for Oct-2018 (MW) 2
3 List of Projects Commissioned in Oct-2018 3
4 All India Installed Capacity (MW) Region-wise as on 31-10-18 3
5 All India Installed Capacity (MW) Sector-wise as on 31-10-18 4
6 Transmission Lines Added during Oct-2018 (Ckms) 5
7 Transformation Capacity Addition during Oct-2018 (MVA) 6
8 Power Supply Position (Energy amp Peak) in Oct-2018 7
9 Peak Shortage of Power Supply (MW) in Different Regions 8-9
10 All India PLF Sector-wise for Oct-2018 10
11 T amp D and AT amp C Losses ()
12 All India Village Electrification
13 Average cost of Power amp Average Realisation
14 All India Coal consumption for Power Generation (MT)
1 Capacity Addition Targets and Achievements in 12th Plan 12
2 Capacity Addition Targets amp Achievements during Oct-2018 13
3 Installed Capacity in various Regions including their shares 14-19
1 Programme and Achievements of Transmission Lines in Oct-2018
2 List of Transmission Lines CommissionedReady for commissioning during Oct-2018
1 Programme and Achievements of Sub-Stations in Oct-2018
2 List of Sub Stations commissionedready for commisssioning in Oct-2018
1 Electricity Generation (MU) Targets and Achievements for 2018-19 22
1 Power Supply Position (Provisional) for Oct-2018 23
2 Peak Demand and Peak Met (Provisional) for Oct-2018 24
3 Power Supply Position (Revised) for Sep-2018 25
4 Peak Demand and Peak Met (Revised) for Sep-2018 26
5 Notified Power cuts Restrictions on Industries during Oct-2018 27
6 Power Supply to Agricultural Sector during Oct-2018 28
1 Growth of Installed Capacity since 6th Plan 29
2 Growth of Transmission Sector since 6th Plan 30
3 All India Yearly Coal consumption for Power Generation (Utilities)
4 All India Annual Per Capita Consumption of Electricity since 2006
5 Average cost of power supply amp Average realisation (Paisakwh)
6 Growth of Rural Electrification amp Pump Sets Energisation
7 Status of Hydro Schemes Cleared by the CEA in Oct-2018
1 Rate of sale of power for the year 2016-17 33-41
Section H - Rate of sale of power for the year 2016-17
Executive Summary for the Month of Oct-2018
32
11
20
21
31
Section B - Capacity Addition
Section C - Transmission Lines
Section D - Sub Stations
Section E - Electricity Generation
Section F - Power supply position
Contents
Section G - Growth of Power Sector
File NoCEA-CH-14-1142018-Coordination Division
SN Contents Page
1Electricity Generation (Conventional Sources) for Oct-2018 (BU) 1
2 Generating Capacity Addition for Oct-2018 (MW) 2
3 List of Projects Commissioned in Oct-2018 3
4 All India Installed Capacity (MW) Region-wise as on 31-10-18 3
5 All India Installed Capacity (MW) Sector-wise as on 31-10-18 4
6 Transmission Lines Added during Oct-2018 (Ckms) 5
7 Transformation Capacity Addition during Oct-2018 (MVA) 6
8 Power Supply Position (Energy amp Peak) in Oct-2018 7
9 Peak Shortage of Power Supply (MW) in Different Regions 8-9
10 All India PLF Sector-wise for Oct-2018 10
11 T amp D and AT amp C Losses ()
12 All India Village Electrification
13 Average cost of Power amp Average Realisation
14 All India Coal consumption for Power Generation (MT)
Section A - Highlights of Power Sector
11
File NoCEA-CH-14-1142018-Coordination Division
Achievement
Oct-18
Thermal 9736 1067
Nuclear 303 -288
Hydro 1262 1287
Bhutan Import 0353 -4146
All India 113364 1019
Type
Thermal
Nuclear
Hydro
Bhutan Import
All India
1A
96003
41664409
9182018
3719257
-551
Change wrt April 2017- Oct
2017
Electricity Generation During April 2017- Oct 2017 amp April 2018- Oct 2018 (BU)
April 2017- Oct 2017 April 2018- Oct 2018
312
10722
49174917171413
102878
0633
62697
22035
502
8797
59698
1 Electricity Generation for Oct-2018 (BU)
Oct-18Type
Achievement
Oct-17
Targets Change
wrt 2017
9443
0603
3533
109320
1118
102878
113364
96000
98000
100000
102000
104000
106000
108000
110000
112000
114000
116000
BU
Oct-17 Oct-18
71413749171
000
10000
20000
30000
40000
50000
60000
70000
80000
BU
April 2017- Oct 2017 April 2018- Oct 2018
File NoCEA-CH-14-1142018-Coordination Division
Generation from
Conventional
Sources
Generation
from
Renewable
Sources
Total Generation from
Conventional Sources
Generation from
Renewable SourcesTotal
Growth in
Conventional
Generation
Growth in
Renewable
Generation
Growth in
Total
Generation
(BU) (BU) (BU) (BU) (BU) (BU) () () ()
113366 8500 121866 102879 6537 109416 1019 3003 1138
Note Tentative
SlNo
Source-Wise All
India
Generation
from
Renewables
Sep-2018 Sep-2017 April 2018- Sept 2018 April 2017- Sept 2017
1 Wind 6093345 3897076 45331034 37069611
2 Solar 3209923 2002513 17912711 10811454
3 Biomass 177174 273211 1382764 1741918
4 Bagasse 231358 270424 3154629 2085272
5 Small Hydro 993983 1021349 5335933 4727041
6 Others 32159 24319 209731 173991
Total 10737943 7488892 73326802 56609286
Note 1) All figures are provisional
2) Data as received from SLDC of the respective states or from the electricity department
Electricity Generation (Conventional and Renewable Sources)
Oct-2018 Oct-2017 Growth
1B
For the Month of Cummulative for the period
All India Generation From Renewables (All Figures are in MU)
File NoCEA-CH-14-1142018-Coordination Division
Achievement Targets Achievement
Oct-17
Thermal 0 1280 600 NA
Hydro 30 0 0 000
Nuclear 0 0 0 NA
All India 30 1280 600 200000
April 2017- Oct 2017 April 2018- Oct 2018 Change
Thermal 4300 670 -84
Hydro 308 140 -55
Nuclear 0 0 NA
All India 4608 810 -82
Note Lakwa Replacement Power Project (69755 MW) had achieved COD on 260418 but
the intimation regarding COD was received in Oct18 (Additional Capacity addition)
2
2 Generating Capacity Addition for Oct-2018 (MW)
Generating Capacity Addition during April 2017- Oct 2017 amp April 2018- Oct 2018
NA- Not Applicable
Change wrt
Oct-2017Type
Oct-18
300
6000
0
100
200
300
400
500
600
700
1Oct-17 Oct-18
0
500
1000
1500
2000
2500
3000
3500
4000
4500
5000
April 2017- Oct 2017 April 2018- Oct 2018
File NoCEA-CH-14-1142018-Coordination Division
(i)
(ii)
(iii)
Nuclear Hydro RES Grand TotalRegion Coal Gas Diesel Total
Northern 5128020 578126 000 5706146 162000 1970777 1363391 9202314
Western 7120862 1080649 000 8201511 184000 754750 2102418 11242679
Southern 4578202 647366 76158 5301726 332000 1183803 3597107 10414636
Eastern 2720164 10000 000 2730164 000 494212 108364 3332740
North-East 52002 177581 3600 233183 000 145200 28745 407128
Islands 000 000 4005 4005 000 000 1256 5261
ALL INDIA 19599250 2493722 83763 22176734 678000 4548742 7201281 34604757
Note Captive Genaration is not included in the total Captive Power capacity as on 31032017 RES as on 30092018 3
Thermal
Nuclear
3 List of Projects Commissioned During Oct-2018
4 All India Installed Capacity (MW) Region-wise as on 31-10-18
Mahan TPP of Essar Power MP ltd of capacity 600 MW was commissioned on 07102018
NIL
Thermal
NIL
Hydro
22176734
678000
4548742
7201281
34604757
51529
000
5000000
10000000
15000000
20000000
25000000
30000000
35000000
40000000
Thermal Nuclear Hydro RES Total Captive
Thermal Nuclear Hydro RES Total Captive
Total = 34604757
File NoCEA-CH-14-1142018-Coordination Division
Sector
Coal Gas Diesel Total
State 6359650 711871 36393 7107913 000 2994200 200887 10303000
Private 7614600 1058060 47370 8720030 000 339400 6850164 15909594
Central 5625000 723791 000 6348791 678000 1215142 150230 8392163
All India 19599250 2493722 83763 22176734 678000 4548742 7201281 34604757
State 10303000
Private 15909594
Central 8392163
Electricity Generation (MU) Targets and Achievements for 2016-17
5 All India Installed Capacity (MW) Sector-wise as on 31-10-18
4
Grand TotalTHERMAL
Nuclear Hydro RES
RES as on 30092018
State 10303000 30
Private 15909594 46
Central 8392163 24
All India Installed Capacity(MW) as on 31-10-2018 (Sector-Wise)
File NoCEA-CH-14-1142018-Coordination Division
Voltage Level
+- 500 KV HVDC
+- 800 KV HVDC
765 KV
400 KV
220 KV
All India
Voltage Level
+- 500 KV HVDC
+- 800 KV HVDC
765 KV
400 kV
220 KV
All India
5
0 0
6 Transmission Lines Added during Oct-2018 (Ckms)
Oct-17 Oct-18
0 0
0 0
0 729
245 737
324 401
569 1867
Transmission Lines Added duringApril 2017- Oct 2017 ampApril 2018- Oct 2018 (Ckms)
April 2017- Oct 2017 April 2018- Oct 2018
2151 4521
13120 11799
0 0
2046 2464
8923 4814
569
1867
0
500
1000
1500
2000
All India
Ckm
s
Oct-17 Oct-18
13120
11799
11000
11500
12000
12500
13000
13500
All India
Ckm
s
April 2017- Oct 2017 April 2018- Oct 2018
File NoCEA-CH-14-1142018-Coordination Division
Voltage Level
+- 800 KV HVDC
+- 500 KV HVDC
765 KV
400 KV
220 KV
All India
Voltage Level
+- 800 KV HVDC
+- 500 KV HVDC
765 KV
400 KV
220 KV
All India
6
7 Transformation Capacity Addition During Oct-2018 (MVA)
0
0
2575
1025
0 0
Oct-17 Oct-18
3600
0
3000
9840
4620
2220
3000 0
All India Transformation Capacity Addition during April 2017- Oct 2017 amp April
2018- Oct 2018 (MVA)
41790
0
14000
17180
10610
45665
10000
23020
9645
0
April 2017- Oct 2017 April 2018- Oct 2018
3600
9840
0
2000
4000
6000
8000
10000
12000
MV
A
Oct-17 Oct-18
4566541790
0
74520
1
MV
A
April 2017- Oct 2017 April 2018- Oct 2018
File NoCEA-CH-14-1142018-Coordination Division
Oct-2017 Oct-2018 Oct-2017 Oct-2018 Oct-2017 Oct-2018
Northern 31786 31822 31096 31375 -22 -14
Western 31728 36308 31628 36178 -03 -04
Southern 24314 29392 24271 29342 -02 -02
Eastern 12012 12547 11931 12507 -07 -03
North Eastern 1487 1387 1451 1351 -24 -25
All India 101327 111455 100377 110753 -09 -06
Oct-2017 Oct-2018 Oct-2017 Oct-2018 Oct-2017 Oct-2018
Northern 51307 50659 50289 49635 -20 -20
Western 48530 56548 46392 55695 -44 -15
Southern 39142 45279 38905 45226 -06 -01
Eastern 19850 22959 19836 22567 -01 -17
North Eastern 2596 2790 2499 2700 -37 -32
All India 162027 172945 157394 170604 -29 -14
Oct-2018 Figures are Provisional
7
8 Power Supply Position (Energy amp Peak) in Oct-2018
Peak Demand Peak Met
Requirement Availability
Energy (MU)Region
Surplus(+)
Deficit (-) in
Surplus(+)
Deficit (-) in Region
Power (MW)
File NoCEA-CH-14-1142018-Coordination Division
Chandigarh Delhi Haryana HP JampK Punjab Rajasthan UP Utrakhand Oct-2017 0 0 0 0 516 0 0 0 0
Oct-2018 0 0 0 0 567 0 0 688 0
Chattisgarh Gujarat MP Maharastra Daman amp Diu Dadar Nagar Goa
Oct-2017 16 0 13 2062 0 0 25
Oct-2018 146 19 39 705 1 4 0
AP Telangana Karnataka Kerala Tamil Nadu Puducherry Lakshadweep
Oct-2017 18 19 0 211 38 2 0
Oct-2018 0 0 0 83 414 1 0
8
9 Peak Shortage of Power Supply (MW) in Different Regions in Oct-2018
0 0 0 0
567
0 0
688
00 0 0 0
516
0 0 0 0
0
400
800
Chan
dig
ar
h
Delh
i
Hary
ana
HP
Jamp
K
Pu
nj
ab
Raja
sth
an
UP
Utr
ak
hand
MW
Northern States (MW) Oct-2018 Oct-2017
146
19
39 705
1 4 016
0 13
2062
0 0 25
0
5000
Ch
attis
garh
Guja
rat
MP
Mah
ara
st
ra
Da
man amp
Diu
Da
dar
Na
gar G
oaM
W
Western States (MW) Oct-2018 Oct-2017
0 0 083
414
1 018 19 0
211
38 2 00
500
AP Telangana Karnataka Kerala Tamil Nadu Puducherry Lakshadweep
Southern State (MW) Oct-2018 Oct-2017
File NoCEA-CH-14-1142018-Coordination Division
Bihar DVC Jharkhand Odisha West Bengal Sikkim AampN Island
Oct-2017 6 0 0 0 8 0 4
Oct-2018 0 0 0 400 0 0 4
Arunachal Assam Manipur Meghalaya Mizoram Nagaland Tripura
Oct-2017 6 77 4 0 2 2 12
Oct-2018 13 81 2 0 2 3 0
9
0 0 0
400
0 0 46 0 0 0 8 0 4
0100200300400500
Bih
ar
DV
C
Jha
rkh
an
d
Od
ish
a
We
st
Be
ng
al
Sik
kim
Aamp
NIs
land
MW
Eastern States (MW) Oct-2018 Oct-2017
13
81
2 0 2 3 06 4 0 2 2
12
0
100
Aru
na
ch
al
Assa
m
Ma
nip
ur
Meghal
aya
Miz
ora
m
Na
gala
nd
Trip
ura
MW
North-Eastern States (MW)
File NoCEA-CH-14-1142018-Coordination Division
Sector Oct-2017 Oct-2018
Central 6872 7355
State 5217 6078
Private 6045 6819
ALL INDIA 5882 6524
Month PLF 2017 PLF 2018
Jan 6014 6288
Feb 6153 6285
March 6313 6558
April 6493 6458
May 6355 6554
June 5672 5917
July 537 5545
Aug 5733 5639
Sep 5989 6109
Oct 5882 6524
For Coal and Lignite based Power Plants and Provisional based on Actual-Cum-Assesment
10
PLF of Thermal Power Plants
All India PLF of Thermal Plants (Excluding Gas Based Plants) Month-wise
10 All India PLF Sector-wise for Oct-2018
68
72
52
17
60
45
58
8273
55
60
78
68
19
65
24
000
1000
2000
3000
4000
5000
6000
7000
8000
Central State Private ALL INDIA
P
LF
Oct-2017 Oct-2018
0
10
20
30
40
50
60
70
Jan Feb March April May June July Aug Sep Oct
Months
All India PLF Month-wise
PLF 2017 PLF 2018
File NoCEA-CH-14-1142018-Coordination Division
2012-13 2013-14 2014-15 2015-16 2016-17
TampD Losses 2304 2284 2277 2181 2142
ATampC Losses 2548 2258 2462
Note As per PFC for utilities selling directly to consumers
Total Number of Villages
597464
Note From the year 2004-05 onwards Definition of Village Electrification-
A village would be declared Electrified if
Without
Subsidy
Gap ACS-
ARR(
Without
Subsidy)
Paiseunit
Gap ACS-
ARR (on
subsidy
booked
basis)
paiseunit
Gap ACS-
ARR (on
subsidyrece
ived basis)
paiseunit
2013-14 400 118 76 77
2014-15 412 108 58 60
Source- PFC Reports on the performance of State Power Utilities
2013-14 4894
2014-15 5304
2015-16 5459
2016-17 5743
2017-18 6080
11
Average cost of supply(ACS)
(paiseunit)
i) Basic Infrastructure such as Distribution Transformer and Distribution lines are provided in the inhabited locality
as well as Dalit Basti hemlet where it exists (For electrification through Non-Conventional Energy Sources a
Distribution Transformer may not be necessary)
14 All India Coal consumption for Power Generation (MT)
520
Average Revenue Realization(paiseunit)
518
Year
ii) Electricity is provided to Public places like Schools Panchayat Office Health Centre Dispensaries Community
Centres etc and
iv) Mandatory Certification from Gram Panchayat regarding the completion of village electrification should be
obtained
13 Average cost of Power amp Average Realisation
iii) The number of households electrified should be at least 10 of the total number of households in the village
11 T amp D and ATampC Losses ()
12 All India Village Electrification
Villiages Electrified (Nos)
10000All villages as per census 2011 has
been electrified on 28042018
Villages electrified
File NoCEA-CH-14-1142018-Coordination Division
SN Contents Page
1 Capacity Addition Targets and Achievements in 12th Plan 12
2 Capacity Addition Targets amp Achievements during Oct-2018 and April 2018- Oct 2018 13
3 Installed Capacity in various Regions including their shares 14-19
Section B - Capacity Addition
File NoCEA-CH-14-1142018-Coordination Division
Figures in MW
TARGET ACH TARGET ACH TARGET ACH TARGET ACH
CENTRAL 14878 15869 6004 2584 5300 2000 26182 20453
STATE 13922 22201 1608 2276 0 0 15530 24477
PRIVATE 43540 53661 3285 619 0 0 46825 54280
ALL INDIA 72340 91730 10897 5479 5300 2000 88537 99209
Figures in MW
Thermal Hydro Nuclear Total
Target Ach Target Ach Target Ach Target Ach
Central 4880 3170 800 390 500 6180 3560 5761
State 3546 1760 300 200 0 3846 1960 5096
Private 2940 3780 205 205 0 3145 3985 12671
Total 11366 8710 1305 795 500 0 13171 9505 7217
12
2 CAPACITY ADDITION TARGET AND ACHIEVEMENT FOR 2017-18 (IN MW)
1 Capacity Addtion Targets and Achievements in the 12th Plan
SECTORTHERMAL HYDRO NUCLEAR TOTAL
File NoCEA-CH-14-1142018-Coordination Division
(MW)
Cummulative
Deviation
Target Achievement Target Achievement (+) (-)
Central 2760 250 0 250 0 -250
State 450615 1030 0 1030 69755 -960245
Private 0 0 600 0 600 600
Total 726615 1280 600 1280 669755 -610245
Central 710 0 0 110 110 0
State 130 0 0 12999 30 -9999
Private 0 0 0 0 0 0
Total 840 0 0 23999 140 -9999
Nuclear Central 0 0 0 0 0 0
Central 3470 250 0 360 110 -250
State 463615 1030 0 115999 99755 -1060235
Private 0 0 600 0 600 600
Total 810615 1280 600 151999 809755 -710235
Electricity Generation (MU) Targets and Achievements for 2016-17
13
2 Capacity Addition Targets Achievements During Oct-2018
Schemes Sector
Target 2018-19
April 2018- Oct 2018Oct-18
Hydro
All India
Capacity Addition TargetsAchievements during the Month of Oct-2018
Thermal
12
80
24
0
0
15
20
67
0
14
0
0
81
0
0
200
400
600
800
1000
1200
1400
1600
Thermal Hydro Nuclear Total
MW
Targets and Achievement during 2018-19Target Achievement
600
0 00 0
600
0
100
200
300
400
500
600
700
800
900
1000
Target Achievement
MW
Targets and Achievement during Oct 2018Thermal Hydro
Nuclear Total
File NoCEA-CH-14-1142018-Coordination Division
Coal Gas Diesel Total
State 1593400 287920 000 1881320 000 869755 68956 2820031
Private 2276083 55800 000 2331883 000 251400 1261535 3844818
Central 1258537 234406 000 1492943 162000 849622 32900 2537465
Sub Total 5128020 578126 000 5706146 162000 1970777 1363391 9202314
State 2128000 284982 000 2412982 000 544650 31119 2988751
Private 3488567 467600 000 3956167 000 48100 2005170 6009437
Central 1504295 328067 000 1832362 184000 162000 66130 2244492
Sub Total 7120862 1080649 000 8201511 184000 754750 2102418 11242679
State 1943250 79198 28788 2051236 000 1183803 52102 3287141
Private 1212450 532210 47370 1792030 000 000 3495815 5287845
Central 1422502 35958 000 1458460 332000 000 49190 1839650
Sub Total 4578202 647366 76158 5301726 332000 1183803 3597107 10414636
State 695000 10000 000 705000 000 353792 22511 1081303
Private 637500 000 000 637500 000 39900 84853 762253
Central 1387664 000 000 1387664 000 100520 1000 1489184
Sub Total 2720164 10000 000 2730164 000 494212 108364 3332740
State 000 49771 3600 53371 000 42200 25674 121245
Private 000 2450 000 2450 000 000 2571 5021
Central 52002 125360 000 177362 000 103000 500 280862
Sub Total 52002 177581 3600 233183 000 145200 28745 407128
State 000 000 4005 4005 000 000 525 4530
Private 000 000 000 000 000 000 221 221
Central 000 000 000 000 000 000 510 510
Sub Total 000 000 4005 4005 000 000 1256 5261
State 6359650 711871 36393 7107913 000 2994200 200887 10303000
Private 7614600 1058060 47370 8720030 000 339400 6850164 15909594
Central 5625000 723791 000 6348791 678000 1215142 150230 8392163
Total 19599250 2493722 83763 22176734 678000 4548742 7201281 34604757
Figures at decimal may not tally due to rounding off
Note -
(As per latest information available with MNRE)
Break up of RES all India as on 30092018 is given below (in MW)
450695 3461510 2402166 7201281
A Oct 2018 669755 MW
B Capacity Retired
during
Oct 2018 705 MW
C Oct 2018 0 MW
D Oct 2018 A-B+C -35245 MW
Share of Telangana from JEGURUPADU CCPP Ph II has been removed and the same has been added to private sector of Andhra Pradesh due to expiry of PPA as per
request from TS Transco
Region
ALL INDIA INSTALLED CAPACITY (IN MW) OF POWER STATIONS (As on 31102018)
(UTILITIES)
Net Capacity Added during
1 RES include SHP BP UampI Solar and Wind Energy Installed capacity in respect of RES (MNRE) as on 30092018
Small
Hydro PowerWind Power
Bio-PowerSolar Power
Total
CapacityBM PowerCogen Waste to Energy
2 U-1 to 7 (76995=69755 MW) of LAKWA REPLACEMENT POWER PROJECT commissioned in April 2018 but intimated in October 2018
has been added to state sector of Assam
1 Badarpur TPS (705 MW) has been retired from central sector of Northern Region
Capacity Up-rated
Ownership Sector
873080 13830
Capacity Added during
1 U-2 (600 MW) of MAHAN TPP has been commissioned and added to private sector of Madhya Pradesh
Grand TotalThermalNuclear Hydro
Islands
ALL INDIA
Abbreviation- SHP=Small Hydro Project (le 25 MW) BP=Biomass Power UampI=Urban amp Industrial Waste Power RES=Renewable Energy Sources
Northern Region
Western Region
Southern Region
Eastern Region
North Eastern
Region
RES
(MNRE)
Modewise breakup
File NoCEA-CH-14-1142018-Coordination Division
Coal Gas Diesel Total
State 13500 180040 000 193540 000 000 000 193540
Private 86922 10800 000 97722 000 000 12157 109879
Central 311272 20701 000 331973 10283 72309 000 414565
Sub-Total 411694 211541 000 623235 10283 72309 12157 717984
State 272000 15000 000 287000 000 110282 5930 403212
Private 408078 000 000 408078 000 20000 34745 462823
Central 129472 53561 000 183034 10094 66370181 500 259998
Sub-Total 809550 68561 000 878112 10094 196652 41175 1126032
State 000 000 000 000 000 69460 25661 95121
Private 000 000 000 000 000 99200 60536 159736
Central 18340 6201 000 24541 2895 122388 000 149824
Sub-Total 18340 6201 000 24541 2895 291048 86197 404681
State 000 17500 000 17500 000 123000 12903 153403
Private 000 000 000 000 000 000 5985 5985
Central 50639 12907 000 63547 6798 109188 000 179533
Sub-Total 50639 30407 000 81047 6798 232188 18888 338921
State 176000 15000 000 191000 000 259770 12780 463550
Private 511550 000 000 511550 000 28800 115462 655812
Central 85458 26401 000 111859 19681 92342 000 223882
Sub-Total 773008 41401 000 814409 19681 380912 128242 1343244
State 585000 60380 000 645380 000 109618 2385 757383
Private 388200 000 000 388200 000 10400 710680 1109280
Central 120625 22110 000 142735 55674 73901 29400 301710
Sub-Total 1093825 82490 000 1176315 55674 193919 742465 2168373
State 546900 000 000 546900 000 72410 2510 621820
Private 871433 000 000 871433 000 84200 266691 1222324
Central 379639 54949 000 434588 28948 180253 3000 646789
Sub-Total 1797972 54949 000 1852921 28948 336863 272201 2490933
State 000 000 000 000 000 125215 6787 132002
Private 9900 45000 000 54900 000 8800 52244 115944
Central 34324 6966 000 41290 3124 47554 000 91968
Sub-Total 44224 51966 000 96190 3124 181569 59031 339914
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 3035 3035
Central 3815 1503 000 5317 801 10171 000 16289
Sub-Total 3815 1503 000 5317 801 10171 3035 19324
124953 29105 000 154058 23703 75145 000 252907
State 1593400 287920 000 1881320 000 869755 68956 2820031
Private 2276083 55800 000 2331883 000 251400 1261535 3844818
Central 1258537 234406 000 1492943 162000 849622 32900 2537465
Grand Total 5128020 578126 000 5706146 162000 1970777 1363391 9202314
Uttar Pradesh
Uttarakhand
Chandigarh
Grand TotalThermalNuclear
Hydro
(Renewable)
RES
(MNRE)
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
NORTHERN REGION
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
(As on 31102018)
Central - Unallocated
Total (Northern
Region)
Delhi
Haryana
Himachal Pradesh
Jammu amp Kashmir
Punjab
Rajasthan
State Ownership Sector
Modewise breakup
File NoCEA-CH-14-1142018-Coordination Division
(As on 31102018)
Coal Gas Diesel Total
State 000 000 000 000 000 000 005 005
Private 000 4800 000 4800 000 000 091 4891
Central 45478 1967 000 47445 2600 000 000 50045
Sub-Total 45478 6767 000 52245 2600 000 096 54941
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 1301 1301
Central 12663 4334 000 16997 700 000 000 17697
Sub-Total 12663 4334 000 16997 700 000 1301 18998
State 475000 217782 000 692782 000 77200 800 770782
Private 776567 396000 000 1172567 000 000 729782 1902349
Central 309051 42400 000 351451 55900 000 23830 431181
Sub-Total 1560618 656182 000 2216800 55900 77200 754412 3104312
State 408000 000 000 408000 000 170366 8396 586762
Private 617400 10000 000 627400 000 000 378205 1005605
Central 279441 25700 000 305141 27300 152000 30000 514441
Sub-Total 1304841 35700 000 1340541 27300 322366 416601 2106808
State 228000 000 000 228000 000 12000 1105 241105
Private 849000 000 000 849000 000 000 52430 901430
Central 195344 000 000 195344 4800 10000 000 210144
Sub-Total 1272344 000 000 1272344 4800 22000 53535 1352679
State 1017000 67200 000 1084200 000 285084 20813 1390097
Private 1245600 56800 000 1302400 000 48100 842815 2193315
Central 433475 227273 000 660748 69000 000 12300 742048
Sub-Total 2696075 351273 000 3047348 69000 333184 875927 4325459
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 546 546
Central 17444 6634 000 24078 900 000 000 24978
Sub-Total 17444 6634 000 24078 900 000 546 25524
211400 19759 000 231159 22800 000 000 253959
State 2128000 284982 000 2412982 000 544650 31119 2988751
Private 3488567 467600 000 3956167 000 48100 2005170 6009437
Central 1504295 328067 000 1832362 184000 162000 66130 2244492
Grand Total 7120862 1080649 000 8201511 184000 754750 2102418 11242679
Central - Unallocated
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
WESTERN REGION
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
State Ownership Sector
Modewise breakup
Grand TotalThermalNuclear
Hydro
(Renewable)
RES
(MNRE)
Total (Western
Region)
Goa
Daman amp Diu
Gujarat
Madhya Pradesh
Chhattisgarh
Maharashtra
Dadra amp Nagar
Naveli
File NoCEA-CH-14-1142018-Coordination Division
(As on 31102018)
Coal Gas Diesel Total
State 501000 23540 000 524540 000 167360 4875 696775
Private 387388 381318 3680 772386 000 000 693073 1465459
Central 167456 000 000 167456 12727 000 25000 205183
Sub-Total 1055844 404858 3680 1464382 12727 167360 722948 2367417
State 508250 000 000 508250 000 247993 4022 760265
Private 83945 83182 000 167127 000 000 375048 542175
Central 195612 000 000 195612 14873 000 1000 211485
Sub-Total 787807 83182 000 870989 14873 247993 380070 1513925
State 502000 000 12792 514792 000 359980 15533 890305
Private 195850 000 2520 198370 000 000 1275640 1474010
Central 282920 000 000 282920 69800 000 000 352720
Sub-Total 980770 000 15312 996082 69800 359980 1291173 2717035
State 000 000 15996 15996 000 188150 15402 219548
Private 61500 17400 000 78900 000 000 20899 99799
Central 114322 35958 000 150280 36200 000 5000 191480
Sub-Total 175822 53358 15996 245176 36200 188150 41301 510827
State 432000 52408 000 484408 000 220320 12270 716998
Private 483767 50310 41170 575247 000 000 1130984 1706231
Central 448952 000 000 448952 144800 000 18190 611942
Sub-Total 1364719 102718 41170 1508607 144800 220320 1161444 3035171
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 000 000
Central 10000 000 000 10000 000 000 000 10000
Sub-Total 10000 000 000 10000 000 000 000 10000
State 000 3250 000 3250 000 000 000 3250
Private 000 000 000 000 000 000 171 171
Central 24840 000 000 24840 8600 000 000 33440
Sub-Total 24840 3250 000 28090 8600 000 171 36861
178400 000 000 178400 45000 000 000 223400
State 1943250 79198 28788 2051236 000 1183803 52102 3287141
Private 1212450 532210 47370 1792030 000 000 3495815 5287845
Central 1422502 35958 000 1458460 332000 000 49190 1839650
Grand Total 4578202 647366 76158 5301726 332000 1183803 3597107 10414636
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
SOUTHERN REGION
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
State Ownership Sector
Modewise breakup
Grand TotalThermal RES
(MNRE)Nuclear
Hydro
(Renewable)
Kerala
Tamil Nadu
NLC
Puducherry
Central - Unallocated
Total (Southern
Region)
Andhra Pradesh
Telangana
Karnataka
File NoCEA-CH-14-1142018-Coordination Division
(As on 31102018)
Coal Gas Diesel Total
State 71000 000 000 71000 000 000 7070 78070
Private 28100 000 000 28100 000 000 25545 53645
Central 291433 000 000 291433 000 11000 000 302432
Sub-Total 390533 000 000 390533 000 11000 32615 434147
State 42000 000 000 42000 000 13000 405 55405
Private 73000 000 000 73000 000 000 3207 76207
Central 39374 000 000 39374 000 6100 000 45474
Sub-Total 154374 000 000 154374 000 19100 3612 177086
State 540000 10000 000 550000 000 98600 9195 657795
Private 242500 000 000 242500 000 000 34452 276952
Central 76077 000 000 76077 000 41000 000 117077
Sub-Total 858577 10000 000 868577 000 139600 43647 1051824
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 000 000
Central 698504 000 000 698504 000 18620 000 717124
Sub-Total 698504 000 000 698504 000 18620 000 717124
State 42000 000 000 42000 000 206192 630 248822
Private 293900 000 000 293900 000 000 21648 315548
Central 163390 000 000 163390 000 8900 1000 173290
Sub-Total 499290 000 000 499290 000 215092 23278 737660
State 000 000 000 000 000 36000 5211 41211
Private 000 000 000 000 000 39900 001 39901
Central 8703 000 000 8703 000 6400 000 15103
Sub-Total 8703 000 000 8703 000 82300 5212 96215
110183 000 000 110183 000 8501 000 118684
State 695000 10000 000 705000 000 353792 22511 1081303
Private 637500 000 000 637500 000 39900 84853 762253
Central 1387664 000 000 1387664 000 100520 1000 1489184
Grand Total 2720164 10000 000 2730164 000 494212 108364 3332740
(As on 31102018)
Coal Gas Diesel Total
State 000 32821 000 32821 000 10000 3001 45822
Private 000 2450 000 2450 000 000 1680 4130
Central 27902 43556 000 71458 000 36851 000 108309
Sub-Total 27902 78827 000 106729 000 46851 4681 158261
State 000 000 000 000 000 000 10710 10710
Private 000 000 000 000 000 000 539 539
Central 2470 4682 000 7152 000 11800 000 18952
Sub-Total 2470 4682 000 7152 000 11800 11249 30201
State 000 000 000 000 000 32200 3103 35303
Private 000 000 000 000 000 000 006 006
Central 3040 10969 000 14009 000 7446 000 21455
Sub-Total 3040 10969 000 14009 000 39646 3109 56764
State 000 16950 000 16950 000 000 1601 18551
Private 000 000 000 000 000 000 009 009
Central 3740 43695 000 47435 000 7077 500 55012
Sub-Total 3740 60645 000 64385 000 7077 2110 73572
State 000 000 3600 3600 000 000 545 4145
Private 000 000 000 000 000 000 217 217
Central 3140 7157 000 10297 000 9677 000 19974
Sub-Total 3140 7157 3600 13897 000 9677 762 24336
State 000 000 000 000 000 000 3067 3067
Private 000 000 000 000 000 000 100 100
Central 2140 4893 000 7033 000 5860 000 12893
Sub-Total 2140 4893 000 7033 000 5860 3167 16060
State 000 000 000 000 000 000 3647 3647
Private 000 000 000 000 000 000 020 020
Central 2070 4046 000 6116 000 9913 000 16029
Sub-Total 2070 4046 000 6116 000 9913 3667 19696
7500 6362 000 13862 000 14376 000 28238
State 000 49771 3600 53371 000 42200 25674 121245
Private 000 2450 000 2450 000 000 2571 5021
Central 52002 125360 000 177362 000 103000 500 280862
Grand Total 52002 177581 3600 233183 000 145200 28745 407128
Central - Unallocated
Total (Eastern
Region)
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
NORTH-EASTERN REGION
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
State Ownership Sector
Modewise breakup
Grand TotalThermalNuclear
Bihar
Jharkhand
West Bengal
DVC
Odisha
Sikkim
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
EASTERN REGION
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
Ownership Sector
Modewise breakup
Grand TotalThermalNuclear
Hydro
(Renewable)
RES
(MNRE)
Manipur
Nagaland
State
Mizoram
Central - Unallocated
Total (North-
Eastern Region)
Hydro
(Renewable)
RES
(MNRE)
Assam
Arunachal Pradesh
Meghalaya
Tripura
File NoCEA-CH-14-1142018-Coordination Division
(As on 31102018)
Coal Gas Diesel Total
State 000 000 4005 4005 000 000 525 4530
Private 000 000 000 000 000 000 146 146
Central 000 000 000 000 000 000 510 510
Sub-Total 000 000 4005 4005 000 000 1181 5186
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 075 075
Central 000 000 000 000 000 000 000 000
Sub-Total 000 000 000 000 000 000 075 075
State 000 000 4005 4005 000 000 525 4530
Private 000 000 000 000 000 000 221 221
Central 000 000 000 000 000 000 510 510
Grand Total 000 000 4005 4005 000 000 1256 5261
19
Andaman amp
Nicobar
lakshadweep
Total (Islands)
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
State Ownership Sector
Modewise breakup
Grand TotalThermalNuclear
Hydro
(Renewable)
RES
(MNRE)
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
ISLANDS
File NoCEA-CH-14-1142018-Coordination Division
SrNo Contents Page
1 Executive summary of Target and Achievement of Transmission Lines during 2018-19
20(1)
2 List of Transmission Lines CommissionedReady for commissioning during Oct-2018 20(2)
Section C - Transmission Lines
File NoCEA-CH-14-1142018-Coordination Division
Executive summary of Target and Achievement of Transmission Lines during 2018-19 As on Oct-18
(All figures in circuit kms)
Centr
al S
ecto
r
Sta
te S
ecto
r
JV
Private
Secto
r
To
tal
Centr
al S
ecto
r
Sta
te S
ecto
r
JV
Private
Secto
r
To
tal
Centr
al S
ecto
r
Sta
te S
ecto
r
JV
Private
Secto
r
To
tal
Centr
al S
ecto
r
Sta
te S
ecto
r
JV
Private
Secto
r
To
tal
Centr
al S
ecto
r
Sta
te S
ecto
r
JV
Private
Secto
r
To
tal
Cen
tral S
ecto
r
Sta
te S
ecto
r
JV
Pri
vate
Secto
r
Gra
nd
To
tal
0 0 0 0 0 0 0 0 4692 766 827 6285 3045 5906 980 9931 553 5878 0 6431 8290 12550 1807 22647
Oct18 Programme 0 0 0 0 0 0 0 0 300 0 0 300 662 90 562 1314 0 723 0 723 962 813 562 2337
Achievement 0 0 0 0 0 0 0 0 729 0 0 729 471 266 0 737 0 401 0 401 1200 667 0 1867
Upto Oct-18 Programme 0 0 0 0 0 0 0 0 3004 416 0 3420 1350 3109 562 5021 481 4346 0 4827 4835 7871 562 13268
Achievement 0 0 0 0 0 0 0 0 2286 0 178 2464 1436 1783 1595 4814 60 4461 0 4521 3782 6244 1773 11799
20(1)
220 kV Grand Total 800 kV 500 kV
Programme 2018-19
Programme
Achievement
HVDC765 kV 400 kV
File NoCEA-CH-14-1142018-Coordination Division
SlNo Line
Length
(cKM)
1 2 3 4 5 6
1 765 Jharsuguda - Dharamjaygarh line DC PGCIL 296
2 765LILO of Kurnool - Thirvualam line at
CuddapahDC PGCIL 190
3 765 Salem PS - Madhugiri PS line SC PGCIL 243
4 400 Cuddapah - Hindupur line (Q) DC PGCIL 338
5 400LILO of Both Ckt of Bamnauli - Samaypur at
TughlakabadMC PGCIL 114
6 400LILO-Out of Cuddapah - Hindupur line (Q)
(Both Ckts) at NP Kunta ssDC PGCIL 19
1200
7 400LILO of Sterlite - Meramundali at Lapanga
4oo kV ssDC OPTCL 14
8 400 Sterlite - Lapanga line DC OPTCL 37
9 400 TMDC Podili - Sattapenalli line DC APTRANSCO 215
10 230Neyveli 230110 kV ss - Eachangadu
230kV FeederSC TANTRANSCO 1
11 230 NNTPS - Neyveli 230110kV ss DC TANTRANSCO 2
12 220 Ajmer (400 kV) - Bherunda (TK) DC RVPNL 100
13 220 Aligarh - Atrauli line DC UPPTCL 77
14 220 Khandwa - Chhanera line DC MPPTCL 78
15 220LILO of one Ckt of Hadala - Sartanpar line
at Wankaner on MC towersDC GETCO 6
16 220 LILO of one Ckt of Vita - Miraj at Alkud ss DC MSETCL 27
17 220 Mendhigiri - Alkud ss DC MSETCL 110
667
1867
20(2)
Grand Total
2Transmission Lines (220 kV and above) CommissionedReady for commissioning During Oct-2018
As on 31-10-18
Voltage
Level (kV)Name of Transmission Lines
Circuit
Type
Executing
Agency
CENTRAL SECTOR
Total of CENTRAL SECTOR
STATE SECTOR Sector
Total of STATE SECTOR
File NoCEA-CH-14-1142018-Coordination Division
SN Contents Page
1 Executive summary of Target and Achievement of Substations during 2018-19 21(1)
2Sub Stations (220 kV and above) commissionedready for commisssioning during Oct-
201821(2)
Section D - Sub Stations
File NoCEA-CH-14-1142018-Coordination Division
1 Executive summary of Target and Achievement of Substations during 2018-19 As on Oct-18
(All figures in circuit MVA)
Centr
al S
ecto
r
Sta
te S
ecto
r
JV
Private
Secto
r
To
tal
Centr
al S
ecto
r
Sta
te S
ecto
r
JV
Private
Secto
r
To
tal
Centr
al S
ecto
r
Sta
te S
ecto
r
JV
Private
Secto
r
To
tal
Centr
al S
ecto
r
Sta
te S
ecto
r
JV
Private
Secto
r
To
tal
Centr
al S
ecto
r
Sta
te S
ecto
r
JV
Private
Secto
r
To
tal
Cen
tral S
ecto
r
Sta
te S
ecto
r
JV
Pri
vate
Secto
r
Gra
nd
To
tal
3000 0 0 3000 0 0 0 0 22200 0 0 22200 8185 13085 630 21900 740 14760 0 15500 34125 27845 630 62600
Oct18 Programme 0 0 0 0 0 0 0 0 0 0 0 0 1000 1260 630 2890 0 1400 0 1400 1000 2660 630 4290
Achievement 0 0 0 0 0 0 0 0 3000 0 0 3000 1500 3120 0 4620 0 2220 0 2220 4500 5340 0 9840
Upto Oct-18 Programme 0 0 0 0 0 0 0 0 10000 0 0 10000 6130 7435 630 14195 0 9670 0 9670 16130 17105 630 33865
Achievement 0 0 0 0 0 0 0 0 14000 0 0 14000 9000 7550 630 17180 0 10610 0 10610 23000 18160 630 41790
21(1)
220 kV Grand Total 800 kV 500 kV
Programme 2018-19
Programme
Achievement
HVDC765 kV 400 kV
File NoCEA-CH-14-1142018-Coordination Division
As on 31-10-18
Sl Voltage Ratio Capacity
No (kVkV) (MWMVA)
1 2 3 4 5
1 Cuddapah Ss 765400 PGCIL 3000
2 Tughlakabad SS (GIS) 400220 PGCIL 1500
Total of CENTRAL SECTOR 4500
3 Panki Kanpur (Aug) TF-I 400200 UPPTCL 75
4 Hindupur ss (1st ICT) 400220 APTRANSCO 315
5 Thappagundu ss 400110 TANTRANSCO 600
6 Mendhasal (2nd power TF) 400220 OPTCL 20
7 Jodhpur ss (New) 400220 RVPNL 315
8 Shankarpally 400220 TSTRANSCO 500
9 Podili ss (1st ICT) 400220 APTRANSCO 315
10 Doni (Gadag)SS 400220 KPTCL 1000
11 Porur (Addl TF) 230110 TANTRANSCO 100
12 Anuppankulam (Addl TF) 230110 TANTRANSCO 60
13 Neyveli SS 230110 TANTRANSCO 480
14 Savarkundla (Aug) 22066 GETCO 60
15 Bhuna (Aug) 220132 HVPNL 100
16 Madanpur (Aug) 22066 HVPNL 100
17 Gurgaon Sec-52A (Aug) 22066 HVPNL 160
18 IA Hisar (Aug) 220132 HVPNL 50
19 Narwana (Aug) 220132 HVPNL 60
20 Therubali (3rd Auto TF) 220132 OPTCL 160
21 Halasar ss 220132 RVPNL 160
22 Bansi Siddaharthnagar (Aug) TF-I 220132 UPPTCL 60
23 Hata Kushinagar (New) TF-I 220132 UPPTCL 100
24 Gomti nagar Lucknow (Aug) TF-IV 22033 UPPTCL 60
25 Kanpur Road Lucknow (New) TF-III 22033 UPPTCL 60
26 Asoj (Aug) 22066 GETCO 150
27 Kangasiyali (Aug) 22066 GETCO 60
28 Karmsad (Aug) 22066 GETCO 160
29 Lalpar (Aug) 22066 GETCO 60
TOTAL STATE SECTOR 5340
GRAND TOTAL 9840
21(2)
PRIVATE SECTOR
CENTRAL SECTOR
STATE SECTOR
2Sub-Stations (220 kV and above) CommissionedReady for commissioning During Oct-2018
Name of Sub StationsExecuting
Agency
File NoCEA-CH-14-1142018-Coordination Division
SN Contents Page
1 Electricity Generation (MU) Targets and Achievements for 2018-19 22
Section E - Electricity Generation
File NoCEA-CH-14-1142018-Coordination Division
Programme Achievement Ach Programme Achievement Ach
Central Sector 35160700 3028100 3162321 10443 20144400 21150469 10499
State Sector 35132000 3010000 3017260 10024 19922100 19549030 9813
PvtIPP Sector 36999700 3240600 3375603 10417 21598300 20794155 9628
PvtUTL Sector 1857600 164500 180597 10979 1130900 1203107 10638
Total 109150000 9443200 9735781 10310 62795700 62696761 9984
Central Sector 5617600 420900 451004 10715 4193000 4045436 9648
State Sector 6110600 559500 708469 12663 4049400 4433000 10947
PvtIPP Sector 1141800 80500 90122 11195 976400 1021963 10467
PvtUTL Sector 130000 11300 12564 11119 76700 99943 13030
Total 13000000 1072200 1262159 11772 9295500 9600342 10328
Central Sector 3850000 353300 303310 8585 2068900 2203540 10651
Total 3850000 353300 303310 8585 2068900 2203540 10651
Bhutan Import 500000 63300 35395 5592 347000 416660 12007
Central Sector 44628300 3802300 3916635 10301 26406300 27399445 10376
State Sector 41242600 3569500 3725729 10438 23971500 23982030 10004
Pvt Sector 40129100 3496900 3658886 10463 23782300 23119168 9721
Total 126500000 10932000 11336645 10370 74507100 74917303 10055
Provisional based on actual-cum-Assesment
Figs in MU
Cummulative
Achievement
Cummulative
Achievement
Sep-18 Sep-17 Upto Sep-2018 Upto Sep-2017
1073794 748889 7332680 5660929
22
Renewable Energy Generation
Achievement
Oct-2018
1 Electricity Generation (MU) Targets and Achievememts for 2018-19
All India Energy Generation During April 2018- Oct 2018 (MU)
Target (2018-19)April 2018- Oct 2018
Sector
Hydro
Thermal
Nuclear
627957
92955
20689
745071
626968
96003
22035
749173
0
100000
200000
300000
400000
500000
600000
700000
800000
Thermal Hydro Nuclear Total
Programme
Achievement
File NoCEA-CH-14-1142018-Coordination Division
SN Contents Page
1 Energy Power Supply Position (Provisional) for Oct-2018 and during April 2018- Oct 2018 23
2 Peak Power Supply Position (Provisional) for Oct-2018 and during April 2018- Oct 2018 24
3 Energy Power Supply Position (Revised) for Sep-2018 and during April 2018- Sept 2018 25
4 Peak Power Supply Position (Revised) for Sep-2018 and during April 2018- Sept 2018 26
5 Notified Power cuts Restrictions on Industries during Oct-2018 27
6 Power Supply to Agricultural Sector during Oct-2018 28
Section F - Power supply position
File NoCEA-CH-14-1142018-Coordination Division
आकड़ मममलयन यननट नट Figures in MU net
ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied
कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )
चडीगढ़ Chandigarh 108 108 0 00 1055 1055 0 00
दिलली Delhi 2490 2489 1 00 22524 22510 14 01
हरियजणज Haryana 4554 4554 0 00 35205 35205 0 00
दहमजचल परिश Himachal Pradesh 788 787 2 02 5728 5560 168 29
रमम कशमीि Jammu amp Kashmir 1497 1219 278 186 10982 8865 2117 193
परजब Punjab 4418 4418 0 00 38832 38819 13 00
िजरसथजन Rajasthan 6748 6748 0 00 45341 45181 160 04
उतति परिश Uttar Pradesh 10136 9973 164 16 75485 74808 676 09
उततिजखड Uttarakhand 1083 1081 3 03 8395 8310 85 10
उततरी कषतर Northern Region 31822 31375 447 14 243547 240314 3233 13
छततीसगढ़ Chhattisgarh 2454 2453 1 00 16119 16091 28 02
गरिजत Gujarat 11636 11636 0 00 70782 70768 14 00
मधय परिश Madhya Pradesh 5860 5859 1 00 38412 38410 2 00
महजिजषटर Maharashtra 15223 15095 128 08 95489 95355 134 01
िमन औि दिउ Daman amp Diu 216 216 0 00 1523 1523 0 00
िजिि व नगि हवली Dadra amp Nagar Haveli 553 553 0 00 3757 3757 0 00
गोवज Goa 366 366 0 00 2497 2495 2 01
पशचिमी कषतर Western Region 36308 36178 130 04 228579 228398 180 01
आनधर परिश Andhra Pradesh 5860 5854 6 01 37377 37334 43 01
तलगजनज Telangana 6748 6742 6 01 38251 38205 46 01
कनजाटक Karnataka 5842 5835 7 01 39111 39059 52 01
किल Kerala 2116 2096 20 09 14256 14160 96 07
तममल नजड Tamil Nadu 8611 8601 10 01 65742 65666 76 01
पडचिी Puducherry 216 215 1 05 1654 1646 8 05
लकष-दवीप Lakshadweep 4 4 0 0 27 27 0 0
दकषकषणी कषतर Southern Region 29392 29342 50 02 196390 196069 321 02
बबहजि Bihar 2742 2738 4 01 19143 18951 192 10
िजमोिि घजटी ननगम DVC 1712 1698 13 08 13096 12828 268 20
झजिखणड Jharkhand 701 697 4 06 5022 4949 73 15
ओडडशज Odisha 3147 3134 13 04 20224 20192 32 02
पशशचम बगजल West Bengal 4204 4200 4 01 33008 32881 127 04
मसशककम Sikkim 40 40 0 00 279 279 0 01
अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 67 202 188 13 67
परवी कषतर Eastern Region 12547 12507 40 03 90772 90080 692 08
अरणजचल परिश Arunachal Pradesh 67 66 1 09 502 496 7 13
असम Assam 833 809 24 29 6153 5903 250 41
मणणपि Manipur 72 71 1 10 485 478 7 14
मघजलय Meghalaya 147 147 0 00 1043 1042 0 00
ममज़ोिम Mizoram 63 62 1 08 365 359 5 14
नजगजलड Nagaland 76 67 8 110 540 481 59 109
बिपिज Tripura 130 129 1 09 1025 1007 19 18
उततर-परवी कषतर North-Eastern Region 1387 1351 35 25 10113 9766 346 34
समपणण भारत All India 111455 110753 702 06 769399 764627 4773 06
23
ऊराण वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Energy Power Supply Position Report (Provisional)
राजयStateअकरबर2018 October2018 अपरल2018 -अकरबर2018 April2018 to October2018
ऊरजा पनत ा म कमी ऊरजा पनत ा म कमीEnergy not Supplied
Excludes energy exported to Bangladesh
Energy not Supplied
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
File NoCEA-CH-14-1142018-Coordination Division
अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met
कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )
चडीगढ़ Chandigarh 217 217 0 00 369 369 0 00
दिलली Delhi 4713 4713 0 00 7016 7016 0 00
हरियजणज Haryana 7948 7948 0 00 10270 10270 0 00
दहमजचल परिश Himachal Pradesh 1520 1520 0 00 1520 1520 0 00
रमम कशमीि Jammu amp Kashmir 2836 2269 567 200 2951 2361 590 200
परजब Punjab 7979 7979 0 00 12638 12638 0 00
िजरसथजन Rajasthan 11450 11450 0 00 11698 11698 0 00
उतति परिश Uttar Pradesh 17434 16745 688 39 20498 20062 436 21
उततिजखड Uttarakhand 1943 1943 0 00 2143 2143 0 00
उततरी कषतर Northern Region 50659 49635 1024 20 63166 61726 1440 23
छततीसगढ़ Chhattisgarh 4414 4268 146 33 4414 4268 146 33
गरिजत Gujarat 18148 18130 19 01 18148 18130 19 01
मधय परिश Madhya Pradesh 11356 11317 39 03 11356 11317 39 03
महजिजषटर Maharashtra 23864 23159 705 30 23864 23254 610 26
िमन औि दिउ Daman amp Diu 342 341 1 02 357 356 1 02
िजिि व नगि हवली Dadra amp Nagar Haveli 784 780 4 05 816 815 1 01
गोवज Goa 536 536 0 00 596 596 0 00
पशचिमी कषतर Western Region 56548 55695 853 15 56548 55695 853 15
आनधर परिश Andhra Pradesh 9435 9435 0 00 9435 9435 0 00
तलगजनज Telangana 10603 10603 0 00 10815 10815 0 00
कनजाटक Karnataka 10741 10741 0 00 10741 10741 0 00
किल Kerala 3727 3644 83 22 4050 3997 53 13
तममल नजड Tamil Nadu 14747 14333 414 28 15029 14981 47 03
पडचिी Puducherry 363 362 1 03 420 400 19 46
लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0
दकषकषणी कषतर Southern Region 45279 45226 53 01 45946 45684 262 06
बबहजि Bihar 4945 4945 0 00 5050 5045 5 01
िजमोिि घजटी ननगम DVC 2729 2729 0 00 2874 2874 0 00
झजिखणड Jharkhand 1260 1260 0 00 1339 1284 55 41
ओडडशज Odisha 5624 5224 400 71 5624 5357 268 48
पशशचम बगजल West Bengal 8775 8775 0 00 9130 9123 7 01
मसशककम Sikkim 86 86 0 00 90 90 0 00
अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7
परवी कषतर Eastern Region 22959 22567 392 17 22959 22567 392 17
अरणजचल परिश Arunachal Pradesh 138 125 13 94 138 133 5 37
असम Assam 1785 1704 81 45 1865 1809 56 30
मणणपि Manipur 187 185 2 11 193 186 7 36
मघजलय Meghalaya 336 336 0 00 371 368 2 07
ममज़ोिम Mizoram 99 97 2 20 103 98 4 41
नजगजलड Nagaland 134 131 3 22 156 138 18 117
बिपिज Tripura 269 269 0 00 298 293 5 17
उततर-परवी कषतर North-Eastern Region 2790 2700 90 32 2967 2850 117 39
समपणण भारत All India 172945 170604 2341 14 177022 175528 1494 08
24
अधिकतम वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Peak Power Supply Position Report (Provisional)
आकड़ मगज वजट नट Figures in MW netअपरल2018 -अकरबर2018 April2018 to October2018
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
मजग की पनता म कमी Demand not Met
Excludes the supply to Bangladesh
राजयStateअकरबर2018 October2018
मजग की पनता म कमी Demand not Met
File NoCEA-CH-14-1142018-Coordination Division
आकड़ मममलयन यननट नट Figures in MU net
ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied
कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )
चडीगढ़ Chandigarh 141 141 0 00 947 947 0 00
दिलली Delhi 2925 2924 1 00 20034 20021 13 01
हरियजणज Haryana 4794 4794 0 00 30651 30651 0 00
दहमजचल परिश Himachal Pradesh 876 853 24 27 4940 4773 167 34
रमम कशमीि Jammu amp Kashmir 1520 1246 274 180 9485 7646 1839 194
परजब Punjab 5575 5575 0 00 34414 34401 13 00
िजरसथजन Rajasthan 6202 6201 0 00 38594 38434 160 04
उतति परिश Uttar Pradesh 10211 10124 86 08 65349 64836 513 08
उततिजखड Uttarakhand 1162 1149 13 11 7311 7229 82 11
उततरी कषतर Northern Region 33405 33008 398 12 211725 208939 2786 13
छततीसगढ़ Chhattisgarh 2403 2388 15 06 13665 13638 27 02
गरिजत Gujarat 10122 10122 0 00 59146 59132 14 00
मधय परिश Madhya Pradesh 5492 5491 1 00 32552 32551 1 00
महजिजषटर Maharashtra 13615 13612 3 00 80266 80260 6 00
िमन औि दिउ Daman amp Diu 221 221 0 00 1306 1306 0 00
िजिि व नगि हवली Dadra amp Nagar Haveli 551 551 0 00 3204 3204 0 00
गोवज Goa 339 339 0 00 2131 2128 2 01
पशचिमी कषतर Western Region 32742 32723 19 01 192270 192220 50 00
आनधर परिश Andhra Pradesh 5294 5287 7 01 31518 31480 37 01
तलगजनज Telangana 6279 6272 8 01 31503 31463 40 01
कनजाटक Karnataka 5701 5693 8 01 33269 33225 45 01
किल Kerala 2050 2026 24 12 12140 12063 76 06
तममल नजड Tamil Nadu 8971 8959 12 01 57131 57065 66 01
पडचिी Puducherry 226 224 2 08 1438 1431 7 05
लकष-दवीप Lakshadweep 4 4 0 0 23 23 0 0
दकषकषणी कषतर Southern Region 28520 28460 60 02 166998 166727 271 02
बबहजि Bihar 2839 2793 46 16 16400 16213 188 11
िजमोिि घजटी ननगम DVC 1901 1750 151 79 11384 11130 254 22
झजिखणड Jharkhand 740 723 17 22 4321 4252 69 16
ओडडशज Odisha 2921 2918 3 01 17077 17058 19 01
पशशचम बगजल West Bengal 4902 4879 23 05 28804 28681 123 04
मसशककम Sikkim 39 39 0 01 239 239 0 01
अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 67 173 162 12 67
परवी कषतर Eastern Region 13341 13102 240 18 78225 77573 652 08
अरणजचल परिश Arunachal Pradesh 74 73 1 10 435 429 6 14
असम Assam 950 914 36 38 5320 5094 226 43
मणणपि Manipur 70 69 1 11 414 408 6 15
मघजलय Meghalaya 150 150 0 01 896 896 0 01
ममज़ोिम Mizoram 58 57 1 12 302 297 5 16
नजगजलड Nagaland 80 72 8 104 464 414 50 108
बिपिज Tripura 192 191 1 07 895 878 17 19
उततर-परवी कषतर North-Eastern Region 1575 1527 48 31 8726 8415 311 36
समपणण भारत All India 109584 108819 765 07 657944 653873 4071 06
Energy not Supplied Energy not Supplied
ससतबर2018 September2018 अपरल2018 -ससतबर2018 April2018 to September2018
ऊरजा पनत ा म कमी ऊरजा पनत ा म कमी
Excludes energy exported to Bangladesh
राजयState
ऊराण वरवदयत आपरतण शथिरत ररपोरण (सशोधित) Energy Power Supply Position Report (Revised)
25
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
File NoCEA-CH-14-1142018-Coordination Division
अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met
कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )
चडीगढ़ Chandigarh 293 293 0 00 369 369 0 00
दिलली Delhi 5358 5358 0 00 7016 7016 0 00
हरियजणज Haryana 9008 9008 0 00 10270 10270 0 00
दहमजचल परिश Himachal Pradesh 1466 1466 0 00 1479 1479 0 00
रमम कशमीि Jammu amp Kashmir 2951 2361 590 200 2951 2361 590 200
परजब Punjab 11405 11405 0 00 12638 12638 0 00
िजरसथजन Rajasthan 10612 10612 0 00 11698 11698 0 00
उतति परिश Uttar Pradesh 18346 18121 225 12 20498 20062 436 21
उततिजखड Uttarakhand 1996 1996 0 00 2143 2143 0 00
उततरी कषतर Northern Region 56407 55649 758 13 63166 61726 1440 23
छततीसगढ़ Chhattisgarh 4404 4075 328 75 4404 4136 268 61
गरिजत Gujarat 16963 16963 0 00 17053 16963 90 05
मधय परिश Madhya Pradesh 8811 8771 41 05 8811 8775 36 04
महजिजषटर Maharashtra 22455 22349 106 05 23395 23254 141 06
िमन औि दिउ Daman amp Diu 357 356 1 02 357 356 1 02
िजिि व नगि हवली Dadra amp Nagar Haveli 816 815 1 01 816 815 1 01
गोवज Goa 596 596 0 00 596 596 0 00
पशचिमी कषतर Western Region 52933 52895 38 01 53841 52895 945 18
आनधर परिश Andhra Pradesh 9435 9416 19 02 9435 9416 19 02
तलगजनज Telangana 10815 10815 0 00 10815 10815 0 00
कनजाटक Karnataka 10103 10090 13 01 10690 10688 2 00
किल Kerala 3888 3638 251 64 4050 3997 53 13
तममल नजड Tamil Nadu 14556 14553 3 00 15029 14981 47 03
पडचिी Puducherry 390 372 17 45 420 400 19 46
लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0
दकषकषणी कषतर Southern Region 45542 45428 114 02 45946 45684 262 06
बबहजि Bihar 5050 5045 5 01 5050 5045 5 01
िजमोिि घजटी ननगम DVC 2641 2641 0 00 2874 2874 0 00
झजिखणड Jharkhand 1233 1233 0 00 1339 1284 55 41
ओडडशज Odisha 4906 4906 0 00 5357 5357 0 00
पशशचम बगजल West Bengal 8644 8639 5 01 9130 9123 7 01
मसशककम Sikkim 78 78 0 00 90 90 0 00
अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7
परवी कषतर Eastern Region 22110 22100 10 00 22470 22290 180 08
अरणजचल परिश Arunachal Pradesh 132 130 2 15 138 133 5 37
असम Assam 1865 1809 56 30 1865 1809 56 30
मणणपि Manipur 184 182 2 13 193 186 7 36
मघजलय Meghalaya 317 317 0 00 371 368 2 07
ममज़ोिम Mizoram 95 93 2 23 103 98 4 41
नजगजलड Nagaland 142 138 5 32 156 138 18 117
बिपिज Tripura 296 293 3 10 298 293 5 17
उततर-परवी कषतर North-Eastern Region 2921 2850 71 24 2967 2850 117 39
समपणण भारत All India 177022 175528 1494 08 177022 175528 1494 08
26
मजग की पनता म कमी मजग की पनता म कमी Demand not MetDemand not Met
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
Excludes the supply to Bangladesh
अधिकतम वरवदयत आपरतण शथिरत ररपोरण (सशोधित) Peak Power Supply Position Report (Revised)
आकड़ मगज वजट नट Figures in MW net
राजयStateससतबर2018 September2018 अपरल2018 -ससतबर2018 April2018 to September2018
File NoCEA-CH-14-1142018-Coordination Division
अकरबर2018 October2018अपरल2018 -अकरबर2018 April2018 to October2018
उततरी कषतर Northern Region
चडीगढ़ Chandigarh Data not received Data not received
दिलली Delhi
हरियजणज Haryana
दहमजचल परिश Himachal Pradesh
रमम कशमीि Jammu amp Kashmir Data not received Data not received
परजब Punjab
िजरसथजन Rajasthanउतति परिश Uttar Pradesh
उततिजखड Uttarakhand
पशचिमी कषतर Western Region
छततीसगढ़ Chhattisgarh
गरिजत Gujarat
मधय परिश Madhya Pradesh
महजिजषटर Maharashtra
गोवज Goa
दकषकषणी कषतर Southern Region
आनधर परिश Andhra Pradesh
तलगजनज Telangana
कनजाटक Karnataka
किल Kerala
तममल नजड Tamil Nadu
पडचिी Puducherryपरवी कषतर Eastern Region
बबहजि Bihar
झजिखणड Jharkhand
ओडडशज Odisha
पशशचम बगजल West Bengal
N
o No
tified
Cuts
N
o No
tified
Cuts
27
अकरबर 2018 म इडथरीर पर वरवदयत करौती का वरवरवरण Notified Power CutsRestrictions on Industries during October2018
राजय कषतर State Regionऊराणमाग करौती EnergyDemand Cut
No Notified Cuts No Notified Cuts
File NoCEA-CH-14-1142018-Coordination Division
अकरबर2018 October2018अपरल2018 -अकरबर2018 April2018 to October2018
उततरी कषतर Northern Region
चडीगढ़ Chandigarh Data not received Data not received
दिलली Delhi Data not received Data not received
हरियजणज Haryana 940 hrsday 0709 - 0950 hrsday
दहमजचल परिश Himachal Pradesh No cut imposed on agriculture consumers and uninterrupted
power is being supplied to agriculture sector
HPSEBL has only 2 agriculture consumers and uninterrupted
power is being supplied to agriculture sector
रमम कशमीि Jammu amp Kashmir Data not received Data not received
परजब Punjab 0507 hrsday 0349 - 0844 hrsday
िजरसथजन Rajasthan 0630 hrsday 0630 hrsday
उतति परिश Uttar Pradesh 1825 hrsday 1814 - 1858 hrsday
उततिजखड Uttarakhand 2350 hrsday 2128 - 2357 hrsday
पशचिमी कषतर Western Region
छततीसगढ़ Chhattisgarh 18hoursday 18 hrsday
गरिजत Gujarat 805 hrsday 805 hrsday
मधय परिश Madhya Pradesh Three-Phase Supply(Irrigation)-947 hrs day
Three-Phase (Mixed) Supply - 2311 hrs day
Three-Phase Supply(Irrigation)- 0933 - 0947 hrs day Three-
Phase (Mixed) Supply - 2300 - 2320 hrs day
महजिजषटर Maharashtra Three-Phase Supply(Irrigation)- 9 hrs day
Three-Phase (Mixed) Supply - 24 hrs day
Three-Phase Supply(Irrigation)- 9 hrs day
Three-Phase (Mixed) Supply - 24 hrs day
गोवज Goa No restriction No restriction
दकषकषणी कषतर Southern Region
आनधर परिश Andhra Pradesh 07 hrsday 07 hrsday
तलगजनज Telangana 24 hoursday 24 hoursday
कनजाटक Karnataka 6 hrsday 6 hrsday
किल Kerala No Restrictions No Restrictions
तममल नजड Tamil Nadu 9 hrsday (6 hrs during day time and 3 hrs during night time) 9 hrsday (6 hrs during day time and 3 hrs during night time)
पडचिी Puducherry No Restrictions No Restrictions
परवी कषतर Eastern Region
बबहजि Bihar About 18 hrsday About 18 hrsday
झजिखणड Jharkhand About 20 hrsday About 20 hrsday
ओडडशज Odisha 24 hrsday 24 hrsday
पशशचम बगजल West Bengal About 23 hrsday About 23 hrsday
28
अकटबर 2018 कषि कषतर को षिदयत आपरति का षििरण Power Supply to Agricultural Sector during October2018
राजय कषतर State Regionऔसत वरवदयत आपरतण घनरो म Average Hours of Supply
On segregated feeders
File NoCEA-CH-14-1142018-Coordination Division
SNo Contents Page
1 Growth of Installed Capacity since 6th Plan 29
2 Progress of Transmission Sector since 6th Plan 30
3 All India Yearly Coal consumption for Power Generation (Utilities)
4 All India Annual Per Capita Consumption of Electricity since -2006
5 Average cost of power supply amp Average realisation (Paisakwh)
6 Growth of Rural Electrification amp Pump Sets Energisation
7 Status of Hydro Schemes Cleared by the CEA in Oct-2018
Section G - Growth of Power Sector
31
32
File NoCEA-CH-14-1142018-Coordination Division
(In MW)
Coal Gas Diesel Total
End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472
End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634
End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537
End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596
End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921
End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703
End of 12th Plan 19216288 2532938 83763 21832988 6780 4447842 50018 31960630
Up to Oct-2018 19599250 2493722 837629 22176734 6780 4548742 7201281 34604757
Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-17) = 51529 MW
Electricity Generation (MU) Targets and Achievements for 2016-17
Coal Gas Diesel Nuclear Hydro Res Total
1959925 2493722 837629 678000 454874 72012805 22925174
29
1 Growth of Installed Capacity Since 6th Plan
Plan YearThermal
Nuclear Hydro RES (MNRE) Total
Total Installed Capacity 34604757 MW
Coal Gas Diesel Nuclear Hydro Res
File NoCEA-CH-14-1142018-Coordination Division
Progress of Transmission Sector in the Country up to Oct 2018
1 TRANSMISSION LINES (All fig in CKM)
At the end of
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
6th plan 0 0 0 0 0 0 0 0 0 0 0 0 1831 4198 0 6029 1641 44364 0 46005 3472 48562 0 52034
7th plan 0 0 0 0 0 0 0 0 0 0 0 0 13068 6756 0 19824 4560 55071 0 59631 17628 61827 0 79455
8th plan 0 0 0 0 1634 0 0 1634 0 0 0 0 23001 13141 0 36142 6564 73036 0 79600 31199 86177 0 117376
9th plan 0 0 0 0 3234 1504 0 4738 751 409 0 1160 29345 20033 0 49378 8687 88306 0 96993 42017 110252 0 152269
10th plan 0 0 0 0 4368 1504 0 5872 1775 409 0 2184 48708 24730 0 73438 9444 105185 0 114629 64295 131828 0 196123
11th Plan 0 0 0 0 5948 1504 1980 9432 4839 411 0 5250 71023 30191 5605 106819 10140 125010 830 135980 91950 157116 8415 257481
12th Plan 6124 0 0 6124 5948 1504 1980 9432 25465 1177 4598 31240 92482 48240 17065 157787 11014 151276 978 163268 141033 202197 24621 367851
13th Plan (Up
to Mar2018)6124 0 0 6124 5948 1504 1980 9432 28666 1512 4881 35059 98247 54286 19067 171600 11258 156497 1000 168755 150243 213799 26928 390970
13th Plan (Up
to Sep-18)6124 0 0 6124 5948 1504 1980 9432 30952 1512 5059 37523 99683 56069 20662 176414 11318 160958 1000 173276 154025 220043 28701 402769
27150
75050
47900
118050
90650
30
IR addition in 12th Plan (up to
March 2017)
Total IR (up to Oct-18)
IR at the end of 11th Plan
IR at the end of 12th Plan
Envisaged IR Capacity at the end
of 13th Plan
Grand Total
Note - The figure upto the end of 10th plan in for stringing progress including the lines not commissioned Now only commissioned lines are reckoned Accordingly the figure for 10th plan (end) may read as 187555 after adjusting with (-) 10852 Ckm
Inter-regional Power Transfer Capacity
plusmn 800 kV HVDC plusmn 500 kV HVDC 765 kV 400 kV 220 kV
File NoCEA-CH-14-1142018-Coordination Division
2004-05 27800
2005-06 28100
2006-07 30200
2007-08 33000
2008-09 35500
2009-10 36700
2010-11 38700
2011-12 41756
2012-13 45460
2013-14 48940
2014-15 53040
2015-16 54590
2016-17 57430
2017-18 60800
Year
2005-06
2006-07
2007-08
2008-09
2009-10
2010-11
2011-12
2012-13
2013-14
2014-15
2015-16
2016-17
2017-18
2004-05 254 209 7568
2005-06 260 221 7636
2006-07 276 227 7423
2007-08 293 239 7727
2008-09 340 263 8713
2009-10 355 268 8870
2010-11 398 303 11975
2011-12 455 330 13514
2012-13 501 376 14867
2013-14 518 175
2014-15 520
6719
7171
3 All India yearly Coal Consumption for Power Generation (Utilities)
YEARCoal Consumption
Million Tonnes
4 All India Annual per Capita consumption of Electricity Since 2006
Per Capita Consumption ( kWh)
6314
(GrossGen+ Net Import) Mid-year population
5 Average cost of power supply amp average realization ( paiseKWH )
Yearcost of supply
(paiseunit)
Realization(paiseunit)
Including AgricultureOnly
Agriculture
1149
7335
7786
91441
8188
88363
957
1010
1075
1122
File NoCEA-CH-14-1142018-Coordination Division
Source- PFC Reports on the performance of State Power Utilities 31
File NoCEA-CH-14-1142018-Coordination Division
Sl
NoExecuting Agency
Installed
Capacity (MW)Cost (Rs crore)
Date of
Clearance
32
No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification
since 2004-05
65291374575 296361511th Plan
Cumu upto End of 11th Plan
596556 21212860
557439Cummulative up to end of 12th Plan
46708
18423975
499150
2003-042004-05
5743
9769
Cumu upto End of 10th Plan
010407 to 310308
010410 to 310311557976840909
010411 to 310312
412667
86293726
3207
482864
12632
1576036
4451722594
15455554
2314176
397343611750
2093311060316074
65109527813884
6 Growth Of Rural Electrification amp Pumpsets Energisation
Plan Year
9th Plan2002-03
134092626
4111
Pump Sets Energised Villages Electricfied (Nos)
2001-02
284064367244
1218
27801997-981998-991999-002000-01
297594
010408 to 310309010409 to 310310
10th Plan
2005-062006-07
322968331020
Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as
Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received
from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made
available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified
villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is
independent of the earlier published reports
No Hydro Electric Project has been issued concurrenceAppraisal letter by CEA during October 2018
7 Status of Hydro Schemes Cleared by the CEA in Oct-2018
Name of Scheme
File NoCEA-CH-14-1142018-Coordination Division
SN Contents Page
1 Rate of sale of power for the year 2016-17 33-41
RATE OF SALE OF POWER FOR THE YEAR 2016-17
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) NORTHERN REGION
CENTRAL SECTOR
BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 18000 66900 19800
CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 54000 222400 21600
CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 30000 144400 19600
CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 23100 91700 42600
PARBATI - III HPS NHPC LTD HYDRO-HYDRO 52000 68200 54800
DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 28000 95600 30000
CHUTAK NHPC LTD HYDRO-HYDRO 4400 22000 79800
DULHASTI HPS NHPC LTD HYDRO-HYDRO 39000 228000 56400
SALAL HPS NHPC LTD HYDRO-HYDRO 69000 342300 11000
TANAKPUR HPS NHPC LTD HYDRO-HYDRO 9420 43000 29600
URI HPS -I NHPC LTD HYDRO-HYDRO 48000 280300 16000
URI HPS - II NHPC LTD HYDRO-HYDRO 24000 147300 48600
NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 4500 24600 88200
SEWA - II NHPC LTD HYDRO-HYDRO 12000 47100 43400
ANTA CCPP NTPC LTD THERMAL-GASN 41930 67539 32400
AURAIYA CCPP NTPC LTD THERMAL-GASN 66336 53501 39100
BADARPUR TPS NTPC LTD THERMAL-COAL 70500 159153 44800
DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 84000 296170 42300
DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 98000 526686 46300
DADRI CCPP NTPC LTD THERMAL-GASHSD 82978 227469 33000
FARIDABAD CCPP NTPC LTD THERMAL-GASN 43159 115577 30800
RIHAND STPS I NTPC LTD THERMAL-COAL 100000 596766 24500
RIHAND STPS II NTPC LTD THERMAL-COAL 100000 737069 24600
RIHAND STPS III NTPC LTD THERMAL-COAL 100000 706546 30600
SINGRAULI STPS NTPC LTD THERMAL-COAL 200000 1394068 20400
TANDA TPS NTPC LTD THERMAL-COAL 44000 295438 40800
UNCHAHAR TPS I NTPC LTD THERMAL-COAL 42000 256454 39800
UNCHAHAR TPS II NTPC LTD THERMAL-COAL 42000 273577 38900
UNCHAHAR TPS III NTPC LTD THERMAL-COAL 21000 142780 43000
KOLDAM NTPC LTD HYDRO-HYDRO 80000 363260 43600
NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 303575 25841
RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 108000 668677 35374
NJHPS SJVNL HYDRO-HYDRO 150000 699496 23820
RAMPUR HPS SJVNL HYDRO-HYDRO 41202 195982 32260
TEHRI HPP THDC HYDRO-HYDRO 100000 272543 51800
KOTESHWAR HEP THDC HYDRO-HYDRO 40000 106244 53400
IGSTPS JHAJJAR ARAVALI P CPL THERMAL-COAL 150000 510429 49490
NEYVELI BARSINGSAR NEYVELI LIG CORP LTD THERMAL-LIG 25000 127520 38040
STATE SECTOR
PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 21000 14222 48200
PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 21000 19205 48400
PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 25000 102257 42600
PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 25000 62107 41800
DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 60000 312213 41000
RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 120000 35767442200
WYC HYDEL STATION HPGCL HYDRO-HYDRO 6240 20365 24900
GIRI POWER HOUSE HPSEB HYDRO-HYDRO 6000 13958 7600
ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 1695 5467 11900
BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 12000 18528 6700
GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 2250 7462 22500
BASSI POWER HOUSE HPSEB HYDRO-HYDRO 6600 29649 7500
BINWA POWER HOUSE HPSEB HYDRO-HYDRO 600 2749 19300
ANNEXURE-I
RATE OF SALE OF POWER FOR THE YEAR 2016-2017
Page 33
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) GAJ POWER HOUSE HPSEB HYDRO-HYDRO 1050 2914 26700
BANER POWER HOUSE HPSEB HYDRO-HYDRO 1200 2864 16200
HOLI POWER HOUSE HPSEB HYDRO-HYDRO 300 616 22500
THIROT POWER HOUSE HPSEB HYDRO-HYDRO 450 1126 22500
KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 1200 3064 22500
LARJI POWER HOUSE HPSEB HYDRO-HYDRO 12600 53677 23700
NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 250 750 31000
CHABA POWER HOUSE HPSEB HYDRO-HYDRO 175 465 23300
RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 150 101 13400
SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 200 000 22500
KILLAR HPSEB HYDRO-HYDRO 030 050 22500
BHABA AUGUMENP H HPSEB HYDRO-HYDRO 450 1276 22500
BS CHAMBA HPSEB HYDRO-HYDRO 045 099 19500
GUMMA HPSEB HYDRO-HYDRO 300 423 22500
GAS TURBINE POWER STATION IPGCL THERMAL-GAS 27000 67233 39300
PPS-I PPCL THERMAL-GAS 33000 175905 38300
PPS-III PPCL THERMAL-GAS 137120 196879 36100
LOWER JHELUM JampKPDD HYDRO-HYDRO 10500 60214 5100
UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 2260 10514 6300
UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 10500 44202 8500
GANDHARBAL JampKPDD HYDRO-HYDRO 1500 8925 4700
KARNAH MPH JampKPDD HYDRO-HYDRO 200 1122 31000
CHENANI I JampKPDD HYDRO-HYDRO 2330 10892 6600
CHENANI II JampKPDD HYDRO-HYDRO 200 1188 9300
CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 750 3634 14200
IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 375 2108 18500
IGO MERCHELLONG JampKPDD HYDRO-HYDRO 300 1572 29700
PAHALGAM MHP JampKPDD HYDRO-HYDRO 450 1713 32900
MARPACHOO JampKPDD HYDRO-HYDRO 075 375 29800
HAFTAL JampKPDD HYDRO-HYDRO 100 483 28700
SANJAK JampKPDD HYDRO-HYDRO 126 441 36000
SEWA-III JampKPDD HYDRO-HYDRO 900 3273 20200
BHADERWAH JampKPDD HYDRO-HYDRO 150 935 8900
BAZGO JampKPDD HYDRO-HYDRO 030 108 33300
SUMOOR JampKPDD HYDRO-HYDRO 010 045 35400
HUNDER JampKPDD HYDRO-HYDRO 040 176 26200
STAKNA JampKPDD HYDRO-HYDRO 400 1933 4100
KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 124000 662879 31360
SURATGARH TPS RRVUNL THERMAL-COAL 150000 402328 41730
CHHABRA TPS 1amp 2 RRVUNL THERMAL-COAL 50000 305946 36700
CHHABRA TPS 3 RRVUNL THERMAL-COAL 25000 151536 36700
CHHABRA TPS 4 RRVUNL THERMAL-COAL 25000 155896 36700
RAMGARH GT POWER PROJECT RRVUNL THERMAL-COAL 22050 43177 41800
RAMGARH GAS T P PROJECT 3 RRVUNL THERMAL-GAS 5000 93615 41800
DHOLPUR C C POWER PROJECT RRVUNL THERMAL-R-LNG 33000 9486 46110
MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 14000 20855 34192
MINI MICRO HYDEL (MMH) P S RRVUNL HYDRO-HYDRO 2385 851 37800
KALISINDH TPP 1 RRVUNL THERMAL-COAL 60000 341543 45000
KALISINDH TPP 2 RRVUNL THERMAL-COAL 60000 211588 45000
KHARA HEP UPJVNL HYDRO-HYDRO 7200 26654 7200
MATATILLA HEP UPJVNL HYDRO-HYDRO 3060 12219 6500
OBRA HEP UPJVNL HYDRO-HYDRO 9900 21517 6300
RIHAND UPJVNL HYDRO-HYDRO 30000 57369 5500
ANPARA A TPS UPRVUNL THERMAL-COAL 63000 317536 27000
ANPARA B TPS UPRVUNL THERMAL-COAL 100000 705605 22700
ANPARA D UPRVUNL THERMAL-COAL 100000 300158 39800
HARDUAGANJ TPS UPRVUNL THERMAL-COAL 16500 45817 49200
HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 50000 304389 46600
OBRA A TPS UPRVUNL THERMAL-COAL 28800 13158 34000
OBRA B TPS UPRVUNL THERMAL-COAL 100000 328124 21900
Page 34
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) PANKI TPS UPRVUNL THERMAL-COAL 21000 66488 50300
PARICHHA TPS UPRVUNL THERMAL-COAL 22000 38762 49400
PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 42000 231931 45600
PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 50000 276722 50400
CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 24000 70845 8290
CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 14400 75366 8390
DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 3375 9595 12080
DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 5100 18701 10520
KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4140 17359 12330
KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 12000 33001 9420
KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 3000 11953 8320
TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 9000 33983 12460
MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 30400 124510 16110
RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 19800 17897 10550
MPUR UTTARAKHAND JVNL HYDRO-HYDRO 930 5121 19200
PATHRI UTTARAKHAND JVNL HYDRO-HYDRO 2040 11636 14200
GALOGI UTTARAKHAND JVNL HYDRO-HYDRO 300 648 12500
PRIVATE SECTOR
MGTPP CLP INDIA PVT LTD THERMAL-COAL 132000 268902 41940
SHRINAGAR HEP ALAKNANDA HPCL HYDRO-HYDRO 33000 127414 48800
GAMA INFRAPROP CCPP GAMA INFRAPROP PVT THERMAL-GAS 22500 52686 47000
PPGCL (BARA) JP POWER VENTURES LTD THERMAL-COAL 198000 448200 38500
MALANA HEP MALANA PCL HYDRO-HYDRO 8600 26354 29792
MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 10000 30369 32580
ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 19200 56347 36079
KASHANG HEP H P PCL HYDRO-HYDRO 19500 5034 29200
BASPA-II HEP HBPCL HYDRO-HYDRO 30000 132769 13600
KARCHAM WANGTOO HEP HBPCL HYDRO-HYDRO 100000 434386 36600
RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 108000 582600 43700
RITHALA COMBI CY POWER PLANT TATA POWER DDL THERMAL-GAS 9480 000 11900
RAJPURA TPS NABHA POWER LTD THERMAL-GAS 140000 901484 39000
TALWANDI SABO POWER LTD TALWANDI SABO POWER LTD THERMAL-COAL 198000 636040 49548
ROJA THERMAL POWER STATION ROJA POWER SCL THERMAL-COAL 120000 727200 43400
KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 34400 63400
BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 36000 62600
MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 38200 60800
UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 37900 61500
KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 42300 58800
LALITPUR PGCL BAJAJ ENERGY PVT LTD THERMAL-COAL 198000 359400 47300
PRAYAGRAJ PGCL PRAYAGRAJ PGCL THERMAL-COAL 132000 448200 38595
KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 132000 783182 33438
WESTERN REGION
CENTRAL SECTOR
INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 100000 325333 23892
OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 52000 141663 34001
GANDHAR CCPP NTPC LTD THERMAL-GAS 65739 221924 28700
KAWAS CCPP NTPC LTD THERMAL-GASN 65620 167929 27000
KORBA I amp II NTPC LTD THERMAL-COAL 210000 1499171 20500
KORBA III NTPC LTD THERMAL-COAL 50000 358746 26600
SIPAT STPS I NTPC LTD THERMAL-COAL 198000 1479902 26800
SIPAT STPS II NTPC LTD THERMAL-COAL 100000 766549 26500
VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 126000 693142 25800
VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 100000 608781 23800
VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 100000 673475 27600
VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 100000 655924 32900
VINDHYACHAL STPS V NTPC LTD THERMAL-COAL 50000 328265 31700
MOUDA I NTPC LTD THERMAL-COAL 100000 343130 44500
MOUDA Ii NTPC LTD THERMAL-COAL 66000 40637 39900
RATNAGIRI GAS amp POWER PVT LTD RGPPL THERMAL-GAS 196708 442485 47000
KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 000 24729
TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 32000 201227 10740
Page 35
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 365122 19069
TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 787444 29324
STATE SECTOR
GSEG-HAZIRA15610 MW GUJARAT S ENEGEN LTD THERMAL-GAS 15610 1805 28200
GSEG-HAZIRA35143 MW GUJARAT S ENEGEN LTD THERMAL-GAS 35130 22276 51300
GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 21978 51800
AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 13929 26100
KORBA TPS EAST CSPGCL THERMAL-COAL 44000 198673 33880
DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 365808 27570
KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 316500 30420
HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 532878 19410
CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 515 58300
MTTPS CHAMPA U-I CSPGCL THERMAL-COAL 50000 220376 39000
MTTPS CHAMPA U-II CSPGCL THERMAL-COAL 50000 23709 10000
SHP GANGREL CSPGCL HYDRO-HYDRO 1000 2350 36790
BANGO HEP CSPGCL HYDRO-HYDRO 12000 14662 8900
MHP KORBA WEST CSPGCL HYDRO-HYDRO 170 859 38190
SIKASAR HEP CSPGCL HYDRO-HYDRO 700 418 26870
DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8843 74500
DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 19446 51500
GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 66388 71600
GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127488 41300
KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 96072 43900
KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 29841 56400
SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 184966 58800
UKAI 1-5 GSECL THERMAL-COAL 85000 204891 46900
UKAI TPS 6 GSECL THERMAL-COAL 50000 284448 48200
WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 271999 58300
WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 82808 44100
KADANA HPS GSECL HYDRO-HYDRO 24200 34433 16800
UKAI HPS GSECL HYDRO-HYDRO 30500 40585 6100
TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 123000 11500
BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 8900 10900
BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 7200 27500
JHINNA HPS MPPGCL HYDRO-HYDRO 2000 9700 18500
RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 44300 3400
GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 17300 4600
SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 4100 16900
MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 14600 27000
PENCH HPS MPPGCL HYDRO-HYDRO 16000 23700 8100
RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 3000 16900
AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 134400 35100
SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 283800 38700
SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 344600 34300
SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 111600 61600
SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 211800 58000
SSTPS PH-I MPPGCL THERMAL-COAL 120000 233100 84300
BHUSAWAL TPS MSPGCL THERMAL-COAL 142000 566258 51100
CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1365682 33700
KHAPERKHEDA MSPGCL THERMAL-COAL 134000 706207 39100
KORADI TPS MSPGCL THERMAL-COAL 62000 443206 42000
NASIK TPS MSPGCL THERMAL-COAL 63000 297275 47000
PARLI TPS MSPGCL THERMAL-COAL 113000 175934 71600
PARAS MSPGCL THERMAL-COAL 50000 267931 38700
URAN CCPP MSPGCL THERMAL-GAS 67200 320330 30600
KOYANA MSPGCL HYDRO-HYDRO 195600 328155 13100
SMALL HYDRO POWER PLANTS MSPGCL HYDRO-HYDRO 45400 93062 30500
BHIRA MSPGCL HYDRO-HYDRO 8000 10046 8400
TILLARI MSPGCL HYDRO-HYDRO 8900 10584 3100
SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 233298 20500
SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 87633 20500
PRIVATE SECTOR
Page 36
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 81282 46750
JNSTPP(JAYPEE NIGRIE) JP POWER VENTURES LTD THERMAL-COAL 132000 726695 29310
MB POWER MB POWER THERMAL-COAL 120000 345632 38310
ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 754922 28671
ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 780761 23495
ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 198000 1263784 32090
ADANI POWER MAHARA ADANI POWER LTD THERMAL-COAL 330000 1666191 34124
AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 170065 36827
SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 252035 45129
ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 458551 36000
ESSAR POWER MP LTD ESSAR POWER MP LTD THERMAL-COAL 60000 243040 28600
VEDANTA LTD (P P -I) VEDANTA LTD THERMAL-GAS 3000 15044 24000
VEDANTA LTD (P P -II) VEDANTA LTD THERMAL-GAS 3000 21293 24000
PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 8234600 24000
165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 5850 64390
145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 68717 40349
SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 132655 28776
SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 144686 38567
MUNDRA UMPPCOASTAL GUJARAT POWER
LTD THERMAL-IMP COAL 400000 2530300
23900
LANCO AMARKANTAK TPP PATHADIH
U-ILANCO AMARKAN POWER LTD THERMAL-COAL 30000 195500
29200
LANCO AMARKANTAK TPP PATHADIH
U-IILANCO AMARKAN POWER LTD THERMAL-COAL 30000 206900
27600
BARADARHA TPS D B POWER LTD THERMAL-COAL 120000 677373 29200
JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 405000 28900
JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 453000 40500
DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 339437 40700
TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 293400 44000
TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 137200 37000
TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 174900 44000
BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 92900 14100
BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23700 34300
KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 27600 48300
CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2530300 23900
BHANDARDRA HEP -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 2475 54900
SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 161400 26500
SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 445000 39000
SOTHERN REGION
CENTRAL SECTOR
NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 325699 54820
NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 305532 39880
NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 998805 38510
NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 113016 54070
NEYVELI TAMILNADU POWER LTD JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 625274 42200
VALLUR TPS NTPC TECL THERMAL-COAL 150000 856438 42350
R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 1493 84300
RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1502919 29400
RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 341291 31800
SIMHADRI I NTPC LTD THERMAL-COAL 100000 688382 36800
SIMHADRI II NTPC LTD THERMAL-COAL 100000 663657 43400
KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 593110 31324
MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 291625 21764
KKNPP-1 amp 2 NPCIL NUCLEAR-NUCLEAR 200000 572609 40948
MINICOY LAKSHADEEP THERMAL-DIESEL 340 770 29600
KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1097 29600
AMINI LAKSHADEEP THERMAL-DIESEL 265 509 29600
ANDROTT LAKSHADEEP THERMAL-DIESEL 219 524 29600
KALPENI LAKSHADEEP THERMAL-DIESEL 175 356 29600
AGATTI LAKSHADEEP THERMAL-DIESEL 195 658 29600
KADMAT LAKSHADEEP THERMAL-DIESEL 190 414 29600
KILTAN LAKSHADEEP THERMAL-DIESEL 150 269 29600
CHETLET LAKSHADEEP THERMAL-DIESEL 100 139 29600
BITRA LAKSHADEEP THERMAL-DIESEL 043 024 29600
BANGARAM LAKSHADEEP THERMAL-DIESEL 018 009 29600
Page 37
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) STATE SECTOR
Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 721811 46500
Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 50000 336142 46500
RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 237358 46500
RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 239926 46500
RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 124500 46500
SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 62109 46500
UPPER SILERU APGENCO HYDRO-HYDRO 24000 33000 46500
LOWER SILERU APGENCO HYDRO-HYDRO 46000 81066 46500
DONKARAI APGENCO HYDRO-HYDRO 2500 6007 46500
PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 1262 46500
CHETTIPETA APGENCO HYDRO-HYDRO 100 214 46500
MUCHKUND APGENCO HYDRO-HYDRO 12000 37571 46500
NAGARJUNASAGAR RCPH APGENCO HYDRO-HYDRO 9000 606 46500
TUNGABHADRA HES amp HAMPI(AP
Share)
APGENCO HYDRO-HYDRO 7200 6100 46500
KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 352232 42600
KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 288131 32500
KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 319272 46500
RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 40073 44300
KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 308317 46000
KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 308963 51300
SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 61004 76600
NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 17960 75300
PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 20873 58300
POCHAMPAD-I TSPGENCO HYDRO-HYDRO 2700 5455 29800
POCHAMPAD-II TSPGENCO HYDRO-HYDRO 900 1932 40700
NIZAMSAGAR TSPGENCO HYDRO-HYDRO 1000 1126 53400
RAICHUR TPS 1 to 7 KPCL THERMAL-COAL 147000 890866 43800
RAICHUR TPS 8 KPCL THERMAL-COAL 25000 159523 48200
BELLARI TPS 1 KPCL THERMAL-COAL 50000 318679 51100
BELLARI TPS 2 KPCL THERMAL-COAL 50000 232347 55600
BELLARI TPS 3 KPCL THERMAL-COAL 70000 47565 34400
BHADRA PH KPCL HYDRO-HYDRO 3920 2369 45900
GERUSUPPA PH KPCL HYDRO-HYDRO 24000 26990 22000
GHAT PRABHA HEP KPCL HYDRO-HYDRO 3200 4777 25300
KADRA HPS KPCL HYDRO-HYDRO 15000 16889 26800
NAGJHARI KPCL HYDRO-HYDRO 90000 155159 9800
KODASALLI DPH KPCL HYDRO-HYDRO 12000 14854 19200
MUNIRA+MGH+SPH+SPH KPCL HYDRO-HYDRO 22640 48211 7900
SHARAVATHY HPS KPCL HYDRO-HYDRO 108550 276215 5400
ALMATTI DPH KPCL HYDRO-HYDRO 29000 39611 24600
VARAHI UGPH KPCL HYDRO-HYDRO 46000 71368 15600
IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 17196 15300
IDUKKI HPS KSEB HYDRO-HYDRO 78000 137905 15300
KAKKAD HPS KSEB HYDRO-HYDRO 5000 13063 15300
KALLADA HPS KSEB HYDRO-HYDRO 1500 4436 15300
KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 46544 15300
KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 635 15300
LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 30822 15300
MALANKARA HPS KSEB HYDRO-HYDRO 1050 2474 15300
MATTUPETTY KSEB HYDRO-HYDRO 200 230 15300
MALAMPUZHA KSEB HYDRO-HYDRO 250 063 15300
CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 864 15300
URUMI ST I amp II KSEB HYDRO-HYDRO 615 903 15300
LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 248 15300
NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7765 19625 15300
PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 16601 15300
PANNIAR HPS KSEB HYDRO-HYDRO 3240 6217 15300
PORINGALKUTHU KSEB HYDRO-HYDRO 3600 10052 15300
PORINGALKUTHU LBE KSEB HYDRO-HYDRO 1600 9438 15300
PEPPARA KSEB HYDRO-HYDRO 300 395 15300
POOZHITHODE KSEB HYDRO-HYDRO 480 1045 15300
Page 38
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) PEECHI KSEB HYDRO-HYDRO 125 040 15300
RANI-PERUNADU KSEB HYDRO-HYDRO 400 585 15300
SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 79783 15300
SENGULAM HPS KSEB HYDRO-HYDRO 5120 11558 15300
SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 16711 15300
VILANGAD KSEB HYDRO-HYDRO 750 1578 15300
BARAPOLE KSEB HYDRO-HYDRO 1500 1932 15300
VELLATHOOVAL KSEB HYDRO-HYDRO 360 305 15300
CHIM0NY KSEB HYDRO-HYDRO 250 156 15300
ADYANPARA KSEB HYDRO-HYDRO 350 501 15300
BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 554 15300
KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 3801 15300
KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 23132 32800
ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 14416 62280
METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 523970 62280
METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 321270 62280
NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 336575 62280
NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 591240 62280
TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 508966 62280
KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 30897 62280
VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 18720 90699 62280
KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 33593 62280
BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 1047 62280
PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 1250 62280
PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 330 62280
MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 4897 62280
MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 032 62280
KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15681 62280
KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 40608 62280
KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 21342 62280
KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 4717 62280
KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4322 62280
KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2399 62280
METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 4416 62280
METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 8035 62280
BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2187 62280
BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2359 62280
BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2511 62280
BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 1949 62280
BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 1819 62280
POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 172 62280
SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 241 62280
MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 026 62280
THIRUMOORTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 136 62280
PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 9309 62280
VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 353 62280
SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 4192 62280
PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 6571 62280
SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 1186 62280
SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6319 62280
ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 6122 62280
KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 28674 62280
SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 18381 62280
SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 4258 62280
KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 12680 62280
KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4201 62280
ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 000 62280
PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 19175 62280
AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 078 62280
BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 504 62280
BHAVANI KATTALAI (BKB)(IIIampIII BB I amp II)TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 5847 62280
PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 000 62280
Page 39
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) SRI DAMODARAM STPS APPDCL THERMAL-COAL 160000 808108 36300
PRIVATE SECTOR
KARUPPUR TANJORE LANCO TANJORE PCL THERMAL-GAS 12000 48096 28770
SIMHAPURI ENERGY LTD SIMHAPURI ENERGY LTD THERMAL-COAL 60000 143900 39100
JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 7111 45500
SBU 1 JSW ENERGY LTD
VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 26000 159100
43300
SBU 2 JSW ENERGY LTD
VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 60000 247900
42800
LANCO KPLLANCO KONDAPALLI POWER
LTDTHERMAL-GAS 36814 85060
25776
LANCO KPL STG -IILANCO KONDAPALLI POWER
LTDTHERMAL-GAS 36600 12979
46330
LANCO KPL STG -IIIALANCO KONDAPALLI POWER
LTDTHERMAL-GAS 37100 85710
46330
LANCO KPL STG -III BLANCO KONDAPALLI POWER
LTDTHERMAL-GAS 37100 43639
46330
HINDUJA NATIONAL PCL HINDUJA NATIONAL PCL THERMAL-COAL 104000 303000 38200
MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 121164 49940
UDUPI POWER COR LTD ADANI POWER LTD THERMAL-COAL 120000 754613 42500
SPECTRUM POWER GENERATION
LTD SPECTRUM PG LTD THERMAL-GASN 20525 9256812
34952
TAQA NEYVELI POWER COM PVT
LTD TAQA NEYVELI THERMAL-LIG 25000 5840
34500
ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 251000 51000
ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 207860 36800
GMR VEMAGIRI POWER GENERATION
LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 30117
46450
EASTERN REGION
CENTRAL SECTOR
MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 64675 53113
MTPS STAGE - II KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 39000 1432 69138
BOKARO `B` TPS DVC THERMAL-COAL 63000 145670 31539
MEJIA TPS U 1-3 DVC THERMAL-COAL 63000 348298 31552
MEJIA TPS U 4 DVC THERMAL-COAL 21000 116099 34997
MEJIA TPS U 5-6 DVC THERMAL-COAL 50000 276427 35976
MEJIA TPS U 7-8 DVC THERMAL-COAL 100000 552854 36991
DURGAPUR STEEL TPS DVC THERMAL-COAL 100000 665550 39323
DURGAPUR TPS DVC THERMAL-COAL 21000 59270 35416
RAGHUNATHPUR TPS DVC THERMAL-COAL 120000 201650 35326
MAITHON HYDEL STA DVC HYDRO-HYDRO 6320 12200 17984
CHANDRAPURA TPSU1-3 DVC THERMAL-COAL 42000 257610 35095
CHANDRAPURA TPSU7-8 DVC THERMAL-COAL 50000 306673 34987
KODERMA TPS DVC THERMAL-COAL 100000 380180 38131
PANCHET HPS DVC HYDRO-HYDRO 8000 13360 17984
TILLAYA HPS DVC HYDRO-HYDRO 400 1410 17984
RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34700 35400
TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 277300 23200
TLDP -III NHPC LTD HYDRO-HYDRO 13200 55400 62000
TLDP -IV NHPC LTD HYDRO-HYDRO 16000 60300 25600
FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 957219 33700
FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 308943 41000
BONGAINGAON TPS NTPC LTD THERMAL-COAL 25000 153663 58600
KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 542277 34200
KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 942591 34200
BARH-II NTPC LTD THERMAL-COAL 132000 728021 44500
TALCHER TPS NTPC LTD THERMAL-COAL 46000 335521 30100
TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 702319 25600
TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1436521 24700
STATE SECTOR
BTPS(RampM) BIHAR STATE PGCL THERMAL-COAL 22000 12142 39700
BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 98331 10602
HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 50593 9482
CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 19689 2605
RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 53192 6033
UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 147208 14637
Page 40
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 60353 4519
IB TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 288567 25000
J P H GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 210 038 61100
MEYONG CHU GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 400 1086 61100
TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 122667 38200
DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 214339 43321
KOLAGHAT THERMAL POWER
STATION
WEST BENGAL PDCL THERMAL-COAL 126000 538269 31603
BAKRESHWAR THERMAL POWER
PLANT
WEST BENGAL PDCL THERMAL-COAL 105000 634876 32154
BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 45000 166855 33299
SANTHALDIH THERMAL POWER
STATION
WEST BENGAL PDCL THERMAL-COAL 50000 336442 34932
SAGARDIGHI THERMAL POWER
PROJECT
WEST BENGAL PDCL THERMAL-COAL 160000 423121 34705
JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 20344 68900
RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 24559 68900
TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 4623 68900
PURULIA PUMPED STORAGE
PROJECT
WEST BENGAL SEDCL HYDRO-HYDRO 90000 108816 68900
MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2768 68900
PRIVATE SECTOR
CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 49474 20230
CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 555500 70200
HALDIA ENERGY HALDIA ENERGY LTD THERMAL-COAL 60000 371000 50400
DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3688 63400
KAMALANGA TPS GMR KAMALANGA ENERGY LTD THERMAL-COAL 105000547670
33300
ADHUNIK POWER U-1 ADHUNIK POWER THERMAL-COAL 27000 158 44060
ADHUNIK POWER U-2 ADHUNIK POWER THERMAL-COAL 27000 168 44250
VL-JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 332800 23622
JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 43000 45250
JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 71700 37030
JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 70700 35920
JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 71100 38870
JOJOBERA UNIT 5 TATA POWER COM LTD THERMAL-COAL 12000 79300 44560
JOJOBERA UNIT 6 TATA POWER COM LTD THERMAL-WHR 12000 83700 12840
IEL KALINGANAGAR U-I TATA POWER COM LTD THERMAL-WG 6750 33400 22500
IEL KALINGANAGAR U-II TATA POWER COM LTD THERMAL-WG 6750 34800 22500
MAITHON UNIT 1 amp 2 TATA POWER COM LTD THERMAL-COAL 105000 678000 36100
HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 27500 24340
HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 28400 24340
HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 15800 24310
NORTH EASTERN REGION
CENTRAL SECTOR
LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 74100 36600
AGARTALA GT NEEPCO THERMAL-GAS 13500 88611 27210
ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 153111 32310
DOYANG HEP NEEPCO HYDRO-HYDRO 7500 25598 49801
KOPILI HEP NEEPCO HYDRO-HYDRO 20000 98186 11491
KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 19582 20237
KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 10310 17968
RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 124093 22945
TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 10100 17344 39000
STATE SECTOR
HYDRO POWER (122 Stns) ITANAGAR GOVT OF ARUNACHAL
PRADESHHYDRO-HYDRO 6971 6217270
24600
KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39514 17337
LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 82327 36810
NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 33318 48290
MYNTRIANG SHEP ST II ASSAM POWER GENCO HYDRO-HYDRO 300 567 35776
LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 9130 49200
LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 012 49200
DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 022 49200
TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 000 49200
UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 4990 16000
UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 6476 37000
UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 16494 14600
UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 3600 9556 15000
SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 758 8000
MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44070 44800
KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 154 41400
TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 091 41400
MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 411 41400
MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 394 41400
KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 760 41400
SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 3264 41400
LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 044 41400
BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 18953 28000
ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 43585 28200
GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 4080 11100
Note
LIG Lignite N Naptha WHR Waste Heat Recovery
Page 41
File NoCEA-CH-14-1142018-Coordination Division
SN Contents Page
1Electricity Generation (Conventional Sources) for Oct-2018 (BU) 1
2 Generating Capacity Addition for Oct-2018 (MW) 2
3 List of Projects Commissioned in Oct-2018 3
4 All India Installed Capacity (MW) Region-wise as on 31-10-18 3
5 All India Installed Capacity (MW) Sector-wise as on 31-10-18 4
6 Transmission Lines Added during Oct-2018 (Ckms) 5
7 Transformation Capacity Addition during Oct-2018 (MVA) 6
8 Power Supply Position (Energy amp Peak) in Oct-2018 7
9 Peak Shortage of Power Supply (MW) in Different Regions 8-9
10 All India PLF Sector-wise for Oct-2018 10
11 T amp D and AT amp C Losses ()
12 All India Village Electrification
13 Average cost of Power amp Average Realisation
14 All India Coal consumption for Power Generation (MT)
Section A - Highlights of Power Sector
11
File NoCEA-CH-14-1142018-Coordination Division
Achievement
Oct-18
Thermal 9736 1067
Nuclear 303 -288
Hydro 1262 1287
Bhutan Import 0353 -4146
All India 113364 1019
Type
Thermal
Nuclear
Hydro
Bhutan Import
All India
1A
96003
41664409
9182018
3719257
-551
Change wrt April 2017- Oct
2017
Electricity Generation During April 2017- Oct 2017 amp April 2018- Oct 2018 (BU)
April 2017- Oct 2017 April 2018- Oct 2018
312
10722
49174917171413
102878
0633
62697
22035
502
8797
59698
1 Electricity Generation for Oct-2018 (BU)
Oct-18Type
Achievement
Oct-17
Targets Change
wrt 2017
9443
0603
3533
109320
1118
102878
113364
96000
98000
100000
102000
104000
106000
108000
110000
112000
114000
116000
BU
Oct-17 Oct-18
71413749171
000
10000
20000
30000
40000
50000
60000
70000
80000
BU
April 2017- Oct 2017 April 2018- Oct 2018
File NoCEA-CH-14-1142018-Coordination Division
Generation from
Conventional
Sources
Generation
from
Renewable
Sources
Total Generation from
Conventional Sources
Generation from
Renewable SourcesTotal
Growth in
Conventional
Generation
Growth in
Renewable
Generation
Growth in
Total
Generation
(BU) (BU) (BU) (BU) (BU) (BU) () () ()
113366 8500 121866 102879 6537 109416 1019 3003 1138
Note Tentative
SlNo
Source-Wise All
India
Generation
from
Renewables
Sep-2018 Sep-2017 April 2018- Sept 2018 April 2017- Sept 2017
1 Wind 6093345 3897076 45331034 37069611
2 Solar 3209923 2002513 17912711 10811454
3 Biomass 177174 273211 1382764 1741918
4 Bagasse 231358 270424 3154629 2085272
5 Small Hydro 993983 1021349 5335933 4727041
6 Others 32159 24319 209731 173991
Total 10737943 7488892 73326802 56609286
Note 1) All figures are provisional
2) Data as received from SLDC of the respective states or from the electricity department
Electricity Generation (Conventional and Renewable Sources)
Oct-2018 Oct-2017 Growth
1B
For the Month of Cummulative for the period
All India Generation From Renewables (All Figures are in MU)
File NoCEA-CH-14-1142018-Coordination Division
Achievement Targets Achievement
Oct-17
Thermal 0 1280 600 NA
Hydro 30 0 0 000
Nuclear 0 0 0 NA
All India 30 1280 600 200000
April 2017- Oct 2017 April 2018- Oct 2018 Change
Thermal 4300 670 -84
Hydro 308 140 -55
Nuclear 0 0 NA
All India 4608 810 -82
Note Lakwa Replacement Power Project (69755 MW) had achieved COD on 260418 but
the intimation regarding COD was received in Oct18 (Additional Capacity addition)
2
2 Generating Capacity Addition for Oct-2018 (MW)
Generating Capacity Addition during April 2017- Oct 2017 amp April 2018- Oct 2018
NA- Not Applicable
Change wrt
Oct-2017Type
Oct-18
300
6000
0
100
200
300
400
500
600
700
1Oct-17 Oct-18
0
500
1000
1500
2000
2500
3000
3500
4000
4500
5000
April 2017- Oct 2017 April 2018- Oct 2018
File NoCEA-CH-14-1142018-Coordination Division
(i)
(ii)
(iii)
Nuclear Hydro RES Grand TotalRegion Coal Gas Diesel Total
Northern 5128020 578126 000 5706146 162000 1970777 1363391 9202314
Western 7120862 1080649 000 8201511 184000 754750 2102418 11242679
Southern 4578202 647366 76158 5301726 332000 1183803 3597107 10414636
Eastern 2720164 10000 000 2730164 000 494212 108364 3332740
North-East 52002 177581 3600 233183 000 145200 28745 407128
Islands 000 000 4005 4005 000 000 1256 5261
ALL INDIA 19599250 2493722 83763 22176734 678000 4548742 7201281 34604757
Note Captive Genaration is not included in the total Captive Power capacity as on 31032017 RES as on 30092018 3
Thermal
Nuclear
3 List of Projects Commissioned During Oct-2018
4 All India Installed Capacity (MW) Region-wise as on 31-10-18
Mahan TPP of Essar Power MP ltd of capacity 600 MW was commissioned on 07102018
NIL
Thermal
NIL
Hydro
22176734
678000
4548742
7201281
34604757
51529
000
5000000
10000000
15000000
20000000
25000000
30000000
35000000
40000000
Thermal Nuclear Hydro RES Total Captive
Thermal Nuclear Hydro RES Total Captive
Total = 34604757
File NoCEA-CH-14-1142018-Coordination Division
Sector
Coal Gas Diesel Total
State 6359650 711871 36393 7107913 000 2994200 200887 10303000
Private 7614600 1058060 47370 8720030 000 339400 6850164 15909594
Central 5625000 723791 000 6348791 678000 1215142 150230 8392163
All India 19599250 2493722 83763 22176734 678000 4548742 7201281 34604757
State 10303000
Private 15909594
Central 8392163
Electricity Generation (MU) Targets and Achievements for 2016-17
5 All India Installed Capacity (MW) Sector-wise as on 31-10-18
4
Grand TotalTHERMAL
Nuclear Hydro RES
RES as on 30092018
State 10303000 30
Private 15909594 46
Central 8392163 24
All India Installed Capacity(MW) as on 31-10-2018 (Sector-Wise)
File NoCEA-CH-14-1142018-Coordination Division
Voltage Level
+- 500 KV HVDC
+- 800 KV HVDC
765 KV
400 KV
220 KV
All India
Voltage Level
+- 500 KV HVDC
+- 800 KV HVDC
765 KV
400 kV
220 KV
All India
5
0 0
6 Transmission Lines Added during Oct-2018 (Ckms)
Oct-17 Oct-18
0 0
0 0
0 729
245 737
324 401
569 1867
Transmission Lines Added duringApril 2017- Oct 2017 ampApril 2018- Oct 2018 (Ckms)
April 2017- Oct 2017 April 2018- Oct 2018
2151 4521
13120 11799
0 0
2046 2464
8923 4814
569
1867
0
500
1000
1500
2000
All India
Ckm
s
Oct-17 Oct-18
13120
11799
11000
11500
12000
12500
13000
13500
All India
Ckm
s
April 2017- Oct 2017 April 2018- Oct 2018
File NoCEA-CH-14-1142018-Coordination Division
Voltage Level
+- 800 KV HVDC
+- 500 KV HVDC
765 KV
400 KV
220 KV
All India
Voltage Level
+- 800 KV HVDC
+- 500 KV HVDC
765 KV
400 KV
220 KV
All India
6
7 Transformation Capacity Addition During Oct-2018 (MVA)
0
0
2575
1025
0 0
Oct-17 Oct-18
3600
0
3000
9840
4620
2220
3000 0
All India Transformation Capacity Addition during April 2017- Oct 2017 amp April
2018- Oct 2018 (MVA)
41790
0
14000
17180
10610
45665
10000
23020
9645
0
April 2017- Oct 2017 April 2018- Oct 2018
3600
9840
0
2000
4000
6000
8000
10000
12000
MV
A
Oct-17 Oct-18
4566541790
0
74520
1
MV
A
April 2017- Oct 2017 April 2018- Oct 2018
File NoCEA-CH-14-1142018-Coordination Division
Oct-2017 Oct-2018 Oct-2017 Oct-2018 Oct-2017 Oct-2018
Northern 31786 31822 31096 31375 -22 -14
Western 31728 36308 31628 36178 -03 -04
Southern 24314 29392 24271 29342 -02 -02
Eastern 12012 12547 11931 12507 -07 -03
North Eastern 1487 1387 1451 1351 -24 -25
All India 101327 111455 100377 110753 -09 -06
Oct-2017 Oct-2018 Oct-2017 Oct-2018 Oct-2017 Oct-2018
Northern 51307 50659 50289 49635 -20 -20
Western 48530 56548 46392 55695 -44 -15
Southern 39142 45279 38905 45226 -06 -01
Eastern 19850 22959 19836 22567 -01 -17
North Eastern 2596 2790 2499 2700 -37 -32
All India 162027 172945 157394 170604 -29 -14
Oct-2018 Figures are Provisional
7
8 Power Supply Position (Energy amp Peak) in Oct-2018
Peak Demand Peak Met
Requirement Availability
Energy (MU)Region
Surplus(+)
Deficit (-) in
Surplus(+)
Deficit (-) in Region
Power (MW)
File NoCEA-CH-14-1142018-Coordination Division
Chandigarh Delhi Haryana HP JampK Punjab Rajasthan UP Utrakhand Oct-2017 0 0 0 0 516 0 0 0 0
Oct-2018 0 0 0 0 567 0 0 688 0
Chattisgarh Gujarat MP Maharastra Daman amp Diu Dadar Nagar Goa
Oct-2017 16 0 13 2062 0 0 25
Oct-2018 146 19 39 705 1 4 0
AP Telangana Karnataka Kerala Tamil Nadu Puducherry Lakshadweep
Oct-2017 18 19 0 211 38 2 0
Oct-2018 0 0 0 83 414 1 0
8
9 Peak Shortage of Power Supply (MW) in Different Regions in Oct-2018
0 0 0 0
567
0 0
688
00 0 0 0
516
0 0 0 0
0
400
800
Chan
dig
ar
h
Delh
i
Hary
ana
HP
Jamp
K
Pu
nj
ab
Raja
sth
an
UP
Utr
ak
hand
MW
Northern States (MW) Oct-2018 Oct-2017
146
19
39 705
1 4 016
0 13
2062
0 0 25
0
5000
Ch
attis
garh
Guja
rat
MP
Mah
ara
st
ra
Da
man amp
Diu
Da
dar
Na
gar G
oaM
W
Western States (MW) Oct-2018 Oct-2017
0 0 083
414
1 018 19 0
211
38 2 00
500
AP Telangana Karnataka Kerala Tamil Nadu Puducherry Lakshadweep
Southern State (MW) Oct-2018 Oct-2017
File NoCEA-CH-14-1142018-Coordination Division
Bihar DVC Jharkhand Odisha West Bengal Sikkim AampN Island
Oct-2017 6 0 0 0 8 0 4
Oct-2018 0 0 0 400 0 0 4
Arunachal Assam Manipur Meghalaya Mizoram Nagaland Tripura
Oct-2017 6 77 4 0 2 2 12
Oct-2018 13 81 2 0 2 3 0
9
0 0 0
400
0 0 46 0 0 0 8 0 4
0100200300400500
Bih
ar
DV
C
Jha
rkh
an
d
Od
ish
a
We
st
Be
ng
al
Sik
kim
Aamp
NIs
land
MW
Eastern States (MW) Oct-2018 Oct-2017
13
81
2 0 2 3 06 4 0 2 2
12
0
100
Aru
na
ch
al
Assa
m
Ma
nip
ur
Meghal
aya
Miz
ora
m
Na
gala
nd
Trip
ura
MW
North-Eastern States (MW)
File NoCEA-CH-14-1142018-Coordination Division
Sector Oct-2017 Oct-2018
Central 6872 7355
State 5217 6078
Private 6045 6819
ALL INDIA 5882 6524
Month PLF 2017 PLF 2018
Jan 6014 6288
Feb 6153 6285
March 6313 6558
April 6493 6458
May 6355 6554
June 5672 5917
July 537 5545
Aug 5733 5639
Sep 5989 6109
Oct 5882 6524
For Coal and Lignite based Power Plants and Provisional based on Actual-Cum-Assesment
10
PLF of Thermal Power Plants
All India PLF of Thermal Plants (Excluding Gas Based Plants) Month-wise
10 All India PLF Sector-wise for Oct-2018
68
72
52
17
60
45
58
8273
55
60
78
68
19
65
24
000
1000
2000
3000
4000
5000
6000
7000
8000
Central State Private ALL INDIA
P
LF
Oct-2017 Oct-2018
0
10
20
30
40
50
60
70
Jan Feb March April May June July Aug Sep Oct
Months
All India PLF Month-wise
PLF 2017 PLF 2018
File NoCEA-CH-14-1142018-Coordination Division
2012-13 2013-14 2014-15 2015-16 2016-17
TampD Losses 2304 2284 2277 2181 2142
ATampC Losses 2548 2258 2462
Note As per PFC for utilities selling directly to consumers
Total Number of Villages
597464
Note From the year 2004-05 onwards Definition of Village Electrification-
A village would be declared Electrified if
Without
Subsidy
Gap ACS-
ARR(
Without
Subsidy)
Paiseunit
Gap ACS-
ARR (on
subsidy
booked
basis)
paiseunit
Gap ACS-
ARR (on
subsidyrece
ived basis)
paiseunit
2013-14 400 118 76 77
2014-15 412 108 58 60
Source- PFC Reports on the performance of State Power Utilities
2013-14 4894
2014-15 5304
2015-16 5459
2016-17 5743
2017-18 6080
11
Average cost of supply(ACS)
(paiseunit)
i) Basic Infrastructure such as Distribution Transformer and Distribution lines are provided in the inhabited locality
as well as Dalit Basti hemlet where it exists (For electrification through Non-Conventional Energy Sources a
Distribution Transformer may not be necessary)
14 All India Coal consumption for Power Generation (MT)
520
Average Revenue Realization(paiseunit)
518
Year
ii) Electricity is provided to Public places like Schools Panchayat Office Health Centre Dispensaries Community
Centres etc and
iv) Mandatory Certification from Gram Panchayat regarding the completion of village electrification should be
obtained
13 Average cost of Power amp Average Realisation
iii) The number of households electrified should be at least 10 of the total number of households in the village
11 T amp D and ATampC Losses ()
12 All India Village Electrification
Villiages Electrified (Nos)
10000All villages as per census 2011 has
been electrified on 28042018
Villages electrified
File NoCEA-CH-14-1142018-Coordination Division
SN Contents Page
1 Capacity Addition Targets and Achievements in 12th Plan 12
2 Capacity Addition Targets amp Achievements during Oct-2018 and April 2018- Oct 2018 13
3 Installed Capacity in various Regions including their shares 14-19
Section B - Capacity Addition
File NoCEA-CH-14-1142018-Coordination Division
Figures in MW
TARGET ACH TARGET ACH TARGET ACH TARGET ACH
CENTRAL 14878 15869 6004 2584 5300 2000 26182 20453
STATE 13922 22201 1608 2276 0 0 15530 24477
PRIVATE 43540 53661 3285 619 0 0 46825 54280
ALL INDIA 72340 91730 10897 5479 5300 2000 88537 99209
Figures in MW
Thermal Hydro Nuclear Total
Target Ach Target Ach Target Ach Target Ach
Central 4880 3170 800 390 500 6180 3560 5761
State 3546 1760 300 200 0 3846 1960 5096
Private 2940 3780 205 205 0 3145 3985 12671
Total 11366 8710 1305 795 500 0 13171 9505 7217
12
2 CAPACITY ADDITION TARGET AND ACHIEVEMENT FOR 2017-18 (IN MW)
1 Capacity Addtion Targets and Achievements in the 12th Plan
SECTORTHERMAL HYDRO NUCLEAR TOTAL
File NoCEA-CH-14-1142018-Coordination Division
(MW)
Cummulative
Deviation
Target Achievement Target Achievement (+) (-)
Central 2760 250 0 250 0 -250
State 450615 1030 0 1030 69755 -960245
Private 0 0 600 0 600 600
Total 726615 1280 600 1280 669755 -610245
Central 710 0 0 110 110 0
State 130 0 0 12999 30 -9999
Private 0 0 0 0 0 0
Total 840 0 0 23999 140 -9999
Nuclear Central 0 0 0 0 0 0
Central 3470 250 0 360 110 -250
State 463615 1030 0 115999 99755 -1060235
Private 0 0 600 0 600 600
Total 810615 1280 600 151999 809755 -710235
Electricity Generation (MU) Targets and Achievements for 2016-17
13
2 Capacity Addition Targets Achievements During Oct-2018
Schemes Sector
Target 2018-19
April 2018- Oct 2018Oct-18
Hydro
All India
Capacity Addition TargetsAchievements during the Month of Oct-2018
Thermal
12
80
24
0
0
15
20
67
0
14
0
0
81
0
0
200
400
600
800
1000
1200
1400
1600
Thermal Hydro Nuclear Total
MW
Targets and Achievement during 2018-19Target Achievement
600
0 00 0
600
0
100
200
300
400
500
600
700
800
900
1000
Target Achievement
MW
Targets and Achievement during Oct 2018Thermal Hydro
Nuclear Total
File NoCEA-CH-14-1142018-Coordination Division
Coal Gas Diesel Total
State 1593400 287920 000 1881320 000 869755 68956 2820031
Private 2276083 55800 000 2331883 000 251400 1261535 3844818
Central 1258537 234406 000 1492943 162000 849622 32900 2537465
Sub Total 5128020 578126 000 5706146 162000 1970777 1363391 9202314
State 2128000 284982 000 2412982 000 544650 31119 2988751
Private 3488567 467600 000 3956167 000 48100 2005170 6009437
Central 1504295 328067 000 1832362 184000 162000 66130 2244492
Sub Total 7120862 1080649 000 8201511 184000 754750 2102418 11242679
State 1943250 79198 28788 2051236 000 1183803 52102 3287141
Private 1212450 532210 47370 1792030 000 000 3495815 5287845
Central 1422502 35958 000 1458460 332000 000 49190 1839650
Sub Total 4578202 647366 76158 5301726 332000 1183803 3597107 10414636
State 695000 10000 000 705000 000 353792 22511 1081303
Private 637500 000 000 637500 000 39900 84853 762253
Central 1387664 000 000 1387664 000 100520 1000 1489184
Sub Total 2720164 10000 000 2730164 000 494212 108364 3332740
State 000 49771 3600 53371 000 42200 25674 121245
Private 000 2450 000 2450 000 000 2571 5021
Central 52002 125360 000 177362 000 103000 500 280862
Sub Total 52002 177581 3600 233183 000 145200 28745 407128
State 000 000 4005 4005 000 000 525 4530
Private 000 000 000 000 000 000 221 221
Central 000 000 000 000 000 000 510 510
Sub Total 000 000 4005 4005 000 000 1256 5261
State 6359650 711871 36393 7107913 000 2994200 200887 10303000
Private 7614600 1058060 47370 8720030 000 339400 6850164 15909594
Central 5625000 723791 000 6348791 678000 1215142 150230 8392163
Total 19599250 2493722 83763 22176734 678000 4548742 7201281 34604757
Figures at decimal may not tally due to rounding off
Note -
(As per latest information available with MNRE)
Break up of RES all India as on 30092018 is given below (in MW)
450695 3461510 2402166 7201281
A Oct 2018 669755 MW
B Capacity Retired
during
Oct 2018 705 MW
C Oct 2018 0 MW
D Oct 2018 A-B+C -35245 MW
Share of Telangana from JEGURUPADU CCPP Ph II has been removed and the same has been added to private sector of Andhra Pradesh due to expiry of PPA as per
request from TS Transco
Region
ALL INDIA INSTALLED CAPACITY (IN MW) OF POWER STATIONS (As on 31102018)
(UTILITIES)
Net Capacity Added during
1 RES include SHP BP UampI Solar and Wind Energy Installed capacity in respect of RES (MNRE) as on 30092018
Small
Hydro PowerWind Power
Bio-PowerSolar Power
Total
CapacityBM PowerCogen Waste to Energy
2 U-1 to 7 (76995=69755 MW) of LAKWA REPLACEMENT POWER PROJECT commissioned in April 2018 but intimated in October 2018
has been added to state sector of Assam
1 Badarpur TPS (705 MW) has been retired from central sector of Northern Region
Capacity Up-rated
Ownership Sector
873080 13830
Capacity Added during
1 U-2 (600 MW) of MAHAN TPP has been commissioned and added to private sector of Madhya Pradesh
Grand TotalThermalNuclear Hydro
Islands
ALL INDIA
Abbreviation- SHP=Small Hydro Project (le 25 MW) BP=Biomass Power UampI=Urban amp Industrial Waste Power RES=Renewable Energy Sources
Northern Region
Western Region
Southern Region
Eastern Region
North Eastern
Region
RES
(MNRE)
Modewise breakup
File NoCEA-CH-14-1142018-Coordination Division
Coal Gas Diesel Total
State 13500 180040 000 193540 000 000 000 193540
Private 86922 10800 000 97722 000 000 12157 109879
Central 311272 20701 000 331973 10283 72309 000 414565
Sub-Total 411694 211541 000 623235 10283 72309 12157 717984
State 272000 15000 000 287000 000 110282 5930 403212
Private 408078 000 000 408078 000 20000 34745 462823
Central 129472 53561 000 183034 10094 66370181 500 259998
Sub-Total 809550 68561 000 878112 10094 196652 41175 1126032
State 000 000 000 000 000 69460 25661 95121
Private 000 000 000 000 000 99200 60536 159736
Central 18340 6201 000 24541 2895 122388 000 149824
Sub-Total 18340 6201 000 24541 2895 291048 86197 404681
State 000 17500 000 17500 000 123000 12903 153403
Private 000 000 000 000 000 000 5985 5985
Central 50639 12907 000 63547 6798 109188 000 179533
Sub-Total 50639 30407 000 81047 6798 232188 18888 338921
State 176000 15000 000 191000 000 259770 12780 463550
Private 511550 000 000 511550 000 28800 115462 655812
Central 85458 26401 000 111859 19681 92342 000 223882
Sub-Total 773008 41401 000 814409 19681 380912 128242 1343244
State 585000 60380 000 645380 000 109618 2385 757383
Private 388200 000 000 388200 000 10400 710680 1109280
Central 120625 22110 000 142735 55674 73901 29400 301710
Sub-Total 1093825 82490 000 1176315 55674 193919 742465 2168373
State 546900 000 000 546900 000 72410 2510 621820
Private 871433 000 000 871433 000 84200 266691 1222324
Central 379639 54949 000 434588 28948 180253 3000 646789
Sub-Total 1797972 54949 000 1852921 28948 336863 272201 2490933
State 000 000 000 000 000 125215 6787 132002
Private 9900 45000 000 54900 000 8800 52244 115944
Central 34324 6966 000 41290 3124 47554 000 91968
Sub-Total 44224 51966 000 96190 3124 181569 59031 339914
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 3035 3035
Central 3815 1503 000 5317 801 10171 000 16289
Sub-Total 3815 1503 000 5317 801 10171 3035 19324
124953 29105 000 154058 23703 75145 000 252907
State 1593400 287920 000 1881320 000 869755 68956 2820031
Private 2276083 55800 000 2331883 000 251400 1261535 3844818
Central 1258537 234406 000 1492943 162000 849622 32900 2537465
Grand Total 5128020 578126 000 5706146 162000 1970777 1363391 9202314
Uttar Pradesh
Uttarakhand
Chandigarh
Grand TotalThermalNuclear
Hydro
(Renewable)
RES
(MNRE)
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
NORTHERN REGION
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
(As on 31102018)
Central - Unallocated
Total (Northern
Region)
Delhi
Haryana
Himachal Pradesh
Jammu amp Kashmir
Punjab
Rajasthan
State Ownership Sector
Modewise breakup
File NoCEA-CH-14-1142018-Coordination Division
(As on 31102018)
Coal Gas Diesel Total
State 000 000 000 000 000 000 005 005
Private 000 4800 000 4800 000 000 091 4891
Central 45478 1967 000 47445 2600 000 000 50045
Sub-Total 45478 6767 000 52245 2600 000 096 54941
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 1301 1301
Central 12663 4334 000 16997 700 000 000 17697
Sub-Total 12663 4334 000 16997 700 000 1301 18998
State 475000 217782 000 692782 000 77200 800 770782
Private 776567 396000 000 1172567 000 000 729782 1902349
Central 309051 42400 000 351451 55900 000 23830 431181
Sub-Total 1560618 656182 000 2216800 55900 77200 754412 3104312
State 408000 000 000 408000 000 170366 8396 586762
Private 617400 10000 000 627400 000 000 378205 1005605
Central 279441 25700 000 305141 27300 152000 30000 514441
Sub-Total 1304841 35700 000 1340541 27300 322366 416601 2106808
State 228000 000 000 228000 000 12000 1105 241105
Private 849000 000 000 849000 000 000 52430 901430
Central 195344 000 000 195344 4800 10000 000 210144
Sub-Total 1272344 000 000 1272344 4800 22000 53535 1352679
State 1017000 67200 000 1084200 000 285084 20813 1390097
Private 1245600 56800 000 1302400 000 48100 842815 2193315
Central 433475 227273 000 660748 69000 000 12300 742048
Sub-Total 2696075 351273 000 3047348 69000 333184 875927 4325459
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 546 546
Central 17444 6634 000 24078 900 000 000 24978
Sub-Total 17444 6634 000 24078 900 000 546 25524
211400 19759 000 231159 22800 000 000 253959
State 2128000 284982 000 2412982 000 544650 31119 2988751
Private 3488567 467600 000 3956167 000 48100 2005170 6009437
Central 1504295 328067 000 1832362 184000 162000 66130 2244492
Grand Total 7120862 1080649 000 8201511 184000 754750 2102418 11242679
Central - Unallocated
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
WESTERN REGION
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
State Ownership Sector
Modewise breakup
Grand TotalThermalNuclear
Hydro
(Renewable)
RES
(MNRE)
Total (Western
Region)
Goa
Daman amp Diu
Gujarat
Madhya Pradesh
Chhattisgarh
Maharashtra
Dadra amp Nagar
Naveli
File NoCEA-CH-14-1142018-Coordination Division
(As on 31102018)
Coal Gas Diesel Total
State 501000 23540 000 524540 000 167360 4875 696775
Private 387388 381318 3680 772386 000 000 693073 1465459
Central 167456 000 000 167456 12727 000 25000 205183
Sub-Total 1055844 404858 3680 1464382 12727 167360 722948 2367417
State 508250 000 000 508250 000 247993 4022 760265
Private 83945 83182 000 167127 000 000 375048 542175
Central 195612 000 000 195612 14873 000 1000 211485
Sub-Total 787807 83182 000 870989 14873 247993 380070 1513925
State 502000 000 12792 514792 000 359980 15533 890305
Private 195850 000 2520 198370 000 000 1275640 1474010
Central 282920 000 000 282920 69800 000 000 352720
Sub-Total 980770 000 15312 996082 69800 359980 1291173 2717035
State 000 000 15996 15996 000 188150 15402 219548
Private 61500 17400 000 78900 000 000 20899 99799
Central 114322 35958 000 150280 36200 000 5000 191480
Sub-Total 175822 53358 15996 245176 36200 188150 41301 510827
State 432000 52408 000 484408 000 220320 12270 716998
Private 483767 50310 41170 575247 000 000 1130984 1706231
Central 448952 000 000 448952 144800 000 18190 611942
Sub-Total 1364719 102718 41170 1508607 144800 220320 1161444 3035171
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 000 000
Central 10000 000 000 10000 000 000 000 10000
Sub-Total 10000 000 000 10000 000 000 000 10000
State 000 3250 000 3250 000 000 000 3250
Private 000 000 000 000 000 000 171 171
Central 24840 000 000 24840 8600 000 000 33440
Sub-Total 24840 3250 000 28090 8600 000 171 36861
178400 000 000 178400 45000 000 000 223400
State 1943250 79198 28788 2051236 000 1183803 52102 3287141
Private 1212450 532210 47370 1792030 000 000 3495815 5287845
Central 1422502 35958 000 1458460 332000 000 49190 1839650
Grand Total 4578202 647366 76158 5301726 332000 1183803 3597107 10414636
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
SOUTHERN REGION
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
State Ownership Sector
Modewise breakup
Grand TotalThermal RES
(MNRE)Nuclear
Hydro
(Renewable)
Kerala
Tamil Nadu
NLC
Puducherry
Central - Unallocated
Total (Southern
Region)
Andhra Pradesh
Telangana
Karnataka
File NoCEA-CH-14-1142018-Coordination Division
(As on 31102018)
Coal Gas Diesel Total
State 71000 000 000 71000 000 000 7070 78070
Private 28100 000 000 28100 000 000 25545 53645
Central 291433 000 000 291433 000 11000 000 302432
Sub-Total 390533 000 000 390533 000 11000 32615 434147
State 42000 000 000 42000 000 13000 405 55405
Private 73000 000 000 73000 000 000 3207 76207
Central 39374 000 000 39374 000 6100 000 45474
Sub-Total 154374 000 000 154374 000 19100 3612 177086
State 540000 10000 000 550000 000 98600 9195 657795
Private 242500 000 000 242500 000 000 34452 276952
Central 76077 000 000 76077 000 41000 000 117077
Sub-Total 858577 10000 000 868577 000 139600 43647 1051824
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 000 000
Central 698504 000 000 698504 000 18620 000 717124
Sub-Total 698504 000 000 698504 000 18620 000 717124
State 42000 000 000 42000 000 206192 630 248822
Private 293900 000 000 293900 000 000 21648 315548
Central 163390 000 000 163390 000 8900 1000 173290
Sub-Total 499290 000 000 499290 000 215092 23278 737660
State 000 000 000 000 000 36000 5211 41211
Private 000 000 000 000 000 39900 001 39901
Central 8703 000 000 8703 000 6400 000 15103
Sub-Total 8703 000 000 8703 000 82300 5212 96215
110183 000 000 110183 000 8501 000 118684
State 695000 10000 000 705000 000 353792 22511 1081303
Private 637500 000 000 637500 000 39900 84853 762253
Central 1387664 000 000 1387664 000 100520 1000 1489184
Grand Total 2720164 10000 000 2730164 000 494212 108364 3332740
(As on 31102018)
Coal Gas Diesel Total
State 000 32821 000 32821 000 10000 3001 45822
Private 000 2450 000 2450 000 000 1680 4130
Central 27902 43556 000 71458 000 36851 000 108309
Sub-Total 27902 78827 000 106729 000 46851 4681 158261
State 000 000 000 000 000 000 10710 10710
Private 000 000 000 000 000 000 539 539
Central 2470 4682 000 7152 000 11800 000 18952
Sub-Total 2470 4682 000 7152 000 11800 11249 30201
State 000 000 000 000 000 32200 3103 35303
Private 000 000 000 000 000 000 006 006
Central 3040 10969 000 14009 000 7446 000 21455
Sub-Total 3040 10969 000 14009 000 39646 3109 56764
State 000 16950 000 16950 000 000 1601 18551
Private 000 000 000 000 000 000 009 009
Central 3740 43695 000 47435 000 7077 500 55012
Sub-Total 3740 60645 000 64385 000 7077 2110 73572
State 000 000 3600 3600 000 000 545 4145
Private 000 000 000 000 000 000 217 217
Central 3140 7157 000 10297 000 9677 000 19974
Sub-Total 3140 7157 3600 13897 000 9677 762 24336
State 000 000 000 000 000 000 3067 3067
Private 000 000 000 000 000 000 100 100
Central 2140 4893 000 7033 000 5860 000 12893
Sub-Total 2140 4893 000 7033 000 5860 3167 16060
State 000 000 000 000 000 000 3647 3647
Private 000 000 000 000 000 000 020 020
Central 2070 4046 000 6116 000 9913 000 16029
Sub-Total 2070 4046 000 6116 000 9913 3667 19696
7500 6362 000 13862 000 14376 000 28238
State 000 49771 3600 53371 000 42200 25674 121245
Private 000 2450 000 2450 000 000 2571 5021
Central 52002 125360 000 177362 000 103000 500 280862
Grand Total 52002 177581 3600 233183 000 145200 28745 407128
Central - Unallocated
Total (Eastern
Region)
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
NORTH-EASTERN REGION
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
State Ownership Sector
Modewise breakup
Grand TotalThermalNuclear
Bihar
Jharkhand
West Bengal
DVC
Odisha
Sikkim
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
EASTERN REGION
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
Ownership Sector
Modewise breakup
Grand TotalThermalNuclear
Hydro
(Renewable)
RES
(MNRE)
Manipur
Nagaland
State
Mizoram
Central - Unallocated
Total (North-
Eastern Region)
Hydro
(Renewable)
RES
(MNRE)
Assam
Arunachal Pradesh
Meghalaya
Tripura
File NoCEA-CH-14-1142018-Coordination Division
(As on 31102018)
Coal Gas Diesel Total
State 000 000 4005 4005 000 000 525 4530
Private 000 000 000 000 000 000 146 146
Central 000 000 000 000 000 000 510 510
Sub-Total 000 000 4005 4005 000 000 1181 5186
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 075 075
Central 000 000 000 000 000 000 000 000
Sub-Total 000 000 000 000 000 000 075 075
State 000 000 4005 4005 000 000 525 4530
Private 000 000 000 000 000 000 221 221
Central 000 000 000 000 000 000 510 510
Grand Total 000 000 4005 4005 000 000 1256 5261
19
Andaman amp
Nicobar
lakshadweep
Total (Islands)
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
State Ownership Sector
Modewise breakup
Grand TotalThermalNuclear
Hydro
(Renewable)
RES
(MNRE)
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
ISLANDS
File NoCEA-CH-14-1142018-Coordination Division
SrNo Contents Page
1 Executive summary of Target and Achievement of Transmission Lines during 2018-19
20(1)
2 List of Transmission Lines CommissionedReady for commissioning during Oct-2018 20(2)
Section C - Transmission Lines
File NoCEA-CH-14-1142018-Coordination Division
Executive summary of Target and Achievement of Transmission Lines during 2018-19 As on Oct-18
(All figures in circuit kms)
Centr
al S
ecto
r
Sta
te S
ecto
r
JV
Private
Secto
r
To
tal
Centr
al S
ecto
r
Sta
te S
ecto
r
JV
Private
Secto
r
To
tal
Centr
al S
ecto
r
Sta
te S
ecto
r
JV
Private
Secto
r
To
tal
Centr
al S
ecto
r
Sta
te S
ecto
r
JV
Private
Secto
r
To
tal
Centr
al S
ecto
r
Sta
te S
ecto
r
JV
Private
Secto
r
To
tal
Cen
tral S
ecto
r
Sta
te S
ecto
r
JV
Pri
vate
Secto
r
Gra
nd
To
tal
0 0 0 0 0 0 0 0 4692 766 827 6285 3045 5906 980 9931 553 5878 0 6431 8290 12550 1807 22647
Oct18 Programme 0 0 0 0 0 0 0 0 300 0 0 300 662 90 562 1314 0 723 0 723 962 813 562 2337
Achievement 0 0 0 0 0 0 0 0 729 0 0 729 471 266 0 737 0 401 0 401 1200 667 0 1867
Upto Oct-18 Programme 0 0 0 0 0 0 0 0 3004 416 0 3420 1350 3109 562 5021 481 4346 0 4827 4835 7871 562 13268
Achievement 0 0 0 0 0 0 0 0 2286 0 178 2464 1436 1783 1595 4814 60 4461 0 4521 3782 6244 1773 11799
20(1)
220 kV Grand Total 800 kV 500 kV
Programme 2018-19
Programme
Achievement
HVDC765 kV 400 kV
File NoCEA-CH-14-1142018-Coordination Division
SlNo Line
Length
(cKM)
1 2 3 4 5 6
1 765 Jharsuguda - Dharamjaygarh line DC PGCIL 296
2 765LILO of Kurnool - Thirvualam line at
CuddapahDC PGCIL 190
3 765 Salem PS - Madhugiri PS line SC PGCIL 243
4 400 Cuddapah - Hindupur line (Q) DC PGCIL 338
5 400LILO of Both Ckt of Bamnauli - Samaypur at
TughlakabadMC PGCIL 114
6 400LILO-Out of Cuddapah - Hindupur line (Q)
(Both Ckts) at NP Kunta ssDC PGCIL 19
1200
7 400LILO of Sterlite - Meramundali at Lapanga
4oo kV ssDC OPTCL 14
8 400 Sterlite - Lapanga line DC OPTCL 37
9 400 TMDC Podili - Sattapenalli line DC APTRANSCO 215
10 230Neyveli 230110 kV ss - Eachangadu
230kV FeederSC TANTRANSCO 1
11 230 NNTPS - Neyveli 230110kV ss DC TANTRANSCO 2
12 220 Ajmer (400 kV) - Bherunda (TK) DC RVPNL 100
13 220 Aligarh - Atrauli line DC UPPTCL 77
14 220 Khandwa - Chhanera line DC MPPTCL 78
15 220LILO of one Ckt of Hadala - Sartanpar line
at Wankaner on MC towersDC GETCO 6
16 220 LILO of one Ckt of Vita - Miraj at Alkud ss DC MSETCL 27
17 220 Mendhigiri - Alkud ss DC MSETCL 110
667
1867
20(2)
Grand Total
2Transmission Lines (220 kV and above) CommissionedReady for commissioning During Oct-2018
As on 31-10-18
Voltage
Level (kV)Name of Transmission Lines
Circuit
Type
Executing
Agency
CENTRAL SECTOR
Total of CENTRAL SECTOR
STATE SECTOR Sector
Total of STATE SECTOR
File NoCEA-CH-14-1142018-Coordination Division
SN Contents Page
1 Executive summary of Target and Achievement of Substations during 2018-19 21(1)
2Sub Stations (220 kV and above) commissionedready for commisssioning during Oct-
201821(2)
Section D - Sub Stations
File NoCEA-CH-14-1142018-Coordination Division
1 Executive summary of Target and Achievement of Substations during 2018-19 As on Oct-18
(All figures in circuit MVA)
Centr
al S
ecto
r
Sta
te S
ecto
r
JV
Private
Secto
r
To
tal
Centr
al S
ecto
r
Sta
te S
ecto
r
JV
Private
Secto
r
To
tal
Centr
al S
ecto
r
Sta
te S
ecto
r
JV
Private
Secto
r
To
tal
Centr
al S
ecto
r
Sta
te S
ecto
r
JV
Private
Secto
r
To
tal
Centr
al S
ecto
r
Sta
te S
ecto
r
JV
Private
Secto
r
To
tal
Cen
tral S
ecto
r
Sta
te S
ecto
r
JV
Pri
vate
Secto
r
Gra
nd
To
tal
3000 0 0 3000 0 0 0 0 22200 0 0 22200 8185 13085 630 21900 740 14760 0 15500 34125 27845 630 62600
Oct18 Programme 0 0 0 0 0 0 0 0 0 0 0 0 1000 1260 630 2890 0 1400 0 1400 1000 2660 630 4290
Achievement 0 0 0 0 0 0 0 0 3000 0 0 3000 1500 3120 0 4620 0 2220 0 2220 4500 5340 0 9840
Upto Oct-18 Programme 0 0 0 0 0 0 0 0 10000 0 0 10000 6130 7435 630 14195 0 9670 0 9670 16130 17105 630 33865
Achievement 0 0 0 0 0 0 0 0 14000 0 0 14000 9000 7550 630 17180 0 10610 0 10610 23000 18160 630 41790
21(1)
220 kV Grand Total 800 kV 500 kV
Programme 2018-19
Programme
Achievement
HVDC765 kV 400 kV
File NoCEA-CH-14-1142018-Coordination Division
As on 31-10-18
Sl Voltage Ratio Capacity
No (kVkV) (MWMVA)
1 2 3 4 5
1 Cuddapah Ss 765400 PGCIL 3000
2 Tughlakabad SS (GIS) 400220 PGCIL 1500
Total of CENTRAL SECTOR 4500
3 Panki Kanpur (Aug) TF-I 400200 UPPTCL 75
4 Hindupur ss (1st ICT) 400220 APTRANSCO 315
5 Thappagundu ss 400110 TANTRANSCO 600
6 Mendhasal (2nd power TF) 400220 OPTCL 20
7 Jodhpur ss (New) 400220 RVPNL 315
8 Shankarpally 400220 TSTRANSCO 500
9 Podili ss (1st ICT) 400220 APTRANSCO 315
10 Doni (Gadag)SS 400220 KPTCL 1000
11 Porur (Addl TF) 230110 TANTRANSCO 100
12 Anuppankulam (Addl TF) 230110 TANTRANSCO 60
13 Neyveli SS 230110 TANTRANSCO 480
14 Savarkundla (Aug) 22066 GETCO 60
15 Bhuna (Aug) 220132 HVPNL 100
16 Madanpur (Aug) 22066 HVPNL 100
17 Gurgaon Sec-52A (Aug) 22066 HVPNL 160
18 IA Hisar (Aug) 220132 HVPNL 50
19 Narwana (Aug) 220132 HVPNL 60
20 Therubali (3rd Auto TF) 220132 OPTCL 160
21 Halasar ss 220132 RVPNL 160
22 Bansi Siddaharthnagar (Aug) TF-I 220132 UPPTCL 60
23 Hata Kushinagar (New) TF-I 220132 UPPTCL 100
24 Gomti nagar Lucknow (Aug) TF-IV 22033 UPPTCL 60
25 Kanpur Road Lucknow (New) TF-III 22033 UPPTCL 60
26 Asoj (Aug) 22066 GETCO 150
27 Kangasiyali (Aug) 22066 GETCO 60
28 Karmsad (Aug) 22066 GETCO 160
29 Lalpar (Aug) 22066 GETCO 60
TOTAL STATE SECTOR 5340
GRAND TOTAL 9840
21(2)
PRIVATE SECTOR
CENTRAL SECTOR
STATE SECTOR
2Sub-Stations (220 kV and above) CommissionedReady for commissioning During Oct-2018
Name of Sub StationsExecuting
Agency
File NoCEA-CH-14-1142018-Coordination Division
SN Contents Page
1 Electricity Generation (MU) Targets and Achievements for 2018-19 22
Section E - Electricity Generation
File NoCEA-CH-14-1142018-Coordination Division
Programme Achievement Ach Programme Achievement Ach
Central Sector 35160700 3028100 3162321 10443 20144400 21150469 10499
State Sector 35132000 3010000 3017260 10024 19922100 19549030 9813
PvtIPP Sector 36999700 3240600 3375603 10417 21598300 20794155 9628
PvtUTL Sector 1857600 164500 180597 10979 1130900 1203107 10638
Total 109150000 9443200 9735781 10310 62795700 62696761 9984
Central Sector 5617600 420900 451004 10715 4193000 4045436 9648
State Sector 6110600 559500 708469 12663 4049400 4433000 10947
PvtIPP Sector 1141800 80500 90122 11195 976400 1021963 10467
PvtUTL Sector 130000 11300 12564 11119 76700 99943 13030
Total 13000000 1072200 1262159 11772 9295500 9600342 10328
Central Sector 3850000 353300 303310 8585 2068900 2203540 10651
Total 3850000 353300 303310 8585 2068900 2203540 10651
Bhutan Import 500000 63300 35395 5592 347000 416660 12007
Central Sector 44628300 3802300 3916635 10301 26406300 27399445 10376
State Sector 41242600 3569500 3725729 10438 23971500 23982030 10004
Pvt Sector 40129100 3496900 3658886 10463 23782300 23119168 9721
Total 126500000 10932000 11336645 10370 74507100 74917303 10055
Provisional based on actual-cum-Assesment
Figs in MU
Cummulative
Achievement
Cummulative
Achievement
Sep-18 Sep-17 Upto Sep-2018 Upto Sep-2017
1073794 748889 7332680 5660929
22
Renewable Energy Generation
Achievement
Oct-2018
1 Electricity Generation (MU) Targets and Achievememts for 2018-19
All India Energy Generation During April 2018- Oct 2018 (MU)
Target (2018-19)April 2018- Oct 2018
Sector
Hydro
Thermal
Nuclear
627957
92955
20689
745071
626968
96003
22035
749173
0
100000
200000
300000
400000
500000
600000
700000
800000
Thermal Hydro Nuclear Total
Programme
Achievement
File NoCEA-CH-14-1142018-Coordination Division
SN Contents Page
1 Energy Power Supply Position (Provisional) for Oct-2018 and during April 2018- Oct 2018 23
2 Peak Power Supply Position (Provisional) for Oct-2018 and during April 2018- Oct 2018 24
3 Energy Power Supply Position (Revised) for Sep-2018 and during April 2018- Sept 2018 25
4 Peak Power Supply Position (Revised) for Sep-2018 and during April 2018- Sept 2018 26
5 Notified Power cuts Restrictions on Industries during Oct-2018 27
6 Power Supply to Agricultural Sector during Oct-2018 28
Section F - Power supply position
File NoCEA-CH-14-1142018-Coordination Division
आकड़ मममलयन यननट नट Figures in MU net
ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied
कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )
चडीगढ़ Chandigarh 108 108 0 00 1055 1055 0 00
दिलली Delhi 2490 2489 1 00 22524 22510 14 01
हरियजणज Haryana 4554 4554 0 00 35205 35205 0 00
दहमजचल परिश Himachal Pradesh 788 787 2 02 5728 5560 168 29
रमम कशमीि Jammu amp Kashmir 1497 1219 278 186 10982 8865 2117 193
परजब Punjab 4418 4418 0 00 38832 38819 13 00
िजरसथजन Rajasthan 6748 6748 0 00 45341 45181 160 04
उतति परिश Uttar Pradesh 10136 9973 164 16 75485 74808 676 09
उततिजखड Uttarakhand 1083 1081 3 03 8395 8310 85 10
उततरी कषतर Northern Region 31822 31375 447 14 243547 240314 3233 13
छततीसगढ़ Chhattisgarh 2454 2453 1 00 16119 16091 28 02
गरिजत Gujarat 11636 11636 0 00 70782 70768 14 00
मधय परिश Madhya Pradesh 5860 5859 1 00 38412 38410 2 00
महजिजषटर Maharashtra 15223 15095 128 08 95489 95355 134 01
िमन औि दिउ Daman amp Diu 216 216 0 00 1523 1523 0 00
िजिि व नगि हवली Dadra amp Nagar Haveli 553 553 0 00 3757 3757 0 00
गोवज Goa 366 366 0 00 2497 2495 2 01
पशचिमी कषतर Western Region 36308 36178 130 04 228579 228398 180 01
आनधर परिश Andhra Pradesh 5860 5854 6 01 37377 37334 43 01
तलगजनज Telangana 6748 6742 6 01 38251 38205 46 01
कनजाटक Karnataka 5842 5835 7 01 39111 39059 52 01
किल Kerala 2116 2096 20 09 14256 14160 96 07
तममल नजड Tamil Nadu 8611 8601 10 01 65742 65666 76 01
पडचिी Puducherry 216 215 1 05 1654 1646 8 05
लकष-दवीप Lakshadweep 4 4 0 0 27 27 0 0
दकषकषणी कषतर Southern Region 29392 29342 50 02 196390 196069 321 02
बबहजि Bihar 2742 2738 4 01 19143 18951 192 10
िजमोिि घजटी ननगम DVC 1712 1698 13 08 13096 12828 268 20
झजिखणड Jharkhand 701 697 4 06 5022 4949 73 15
ओडडशज Odisha 3147 3134 13 04 20224 20192 32 02
पशशचम बगजल West Bengal 4204 4200 4 01 33008 32881 127 04
मसशककम Sikkim 40 40 0 00 279 279 0 01
अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 67 202 188 13 67
परवी कषतर Eastern Region 12547 12507 40 03 90772 90080 692 08
अरणजचल परिश Arunachal Pradesh 67 66 1 09 502 496 7 13
असम Assam 833 809 24 29 6153 5903 250 41
मणणपि Manipur 72 71 1 10 485 478 7 14
मघजलय Meghalaya 147 147 0 00 1043 1042 0 00
ममज़ोिम Mizoram 63 62 1 08 365 359 5 14
नजगजलड Nagaland 76 67 8 110 540 481 59 109
बिपिज Tripura 130 129 1 09 1025 1007 19 18
उततर-परवी कषतर North-Eastern Region 1387 1351 35 25 10113 9766 346 34
समपणण भारत All India 111455 110753 702 06 769399 764627 4773 06
23
ऊराण वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Energy Power Supply Position Report (Provisional)
राजयStateअकरबर2018 October2018 अपरल2018 -अकरबर2018 April2018 to October2018
ऊरजा पनत ा म कमी ऊरजा पनत ा म कमीEnergy not Supplied
Excludes energy exported to Bangladesh
Energy not Supplied
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
File NoCEA-CH-14-1142018-Coordination Division
अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met
कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )
चडीगढ़ Chandigarh 217 217 0 00 369 369 0 00
दिलली Delhi 4713 4713 0 00 7016 7016 0 00
हरियजणज Haryana 7948 7948 0 00 10270 10270 0 00
दहमजचल परिश Himachal Pradesh 1520 1520 0 00 1520 1520 0 00
रमम कशमीि Jammu amp Kashmir 2836 2269 567 200 2951 2361 590 200
परजब Punjab 7979 7979 0 00 12638 12638 0 00
िजरसथजन Rajasthan 11450 11450 0 00 11698 11698 0 00
उतति परिश Uttar Pradesh 17434 16745 688 39 20498 20062 436 21
उततिजखड Uttarakhand 1943 1943 0 00 2143 2143 0 00
उततरी कषतर Northern Region 50659 49635 1024 20 63166 61726 1440 23
छततीसगढ़ Chhattisgarh 4414 4268 146 33 4414 4268 146 33
गरिजत Gujarat 18148 18130 19 01 18148 18130 19 01
मधय परिश Madhya Pradesh 11356 11317 39 03 11356 11317 39 03
महजिजषटर Maharashtra 23864 23159 705 30 23864 23254 610 26
िमन औि दिउ Daman amp Diu 342 341 1 02 357 356 1 02
िजिि व नगि हवली Dadra amp Nagar Haveli 784 780 4 05 816 815 1 01
गोवज Goa 536 536 0 00 596 596 0 00
पशचिमी कषतर Western Region 56548 55695 853 15 56548 55695 853 15
आनधर परिश Andhra Pradesh 9435 9435 0 00 9435 9435 0 00
तलगजनज Telangana 10603 10603 0 00 10815 10815 0 00
कनजाटक Karnataka 10741 10741 0 00 10741 10741 0 00
किल Kerala 3727 3644 83 22 4050 3997 53 13
तममल नजड Tamil Nadu 14747 14333 414 28 15029 14981 47 03
पडचिी Puducherry 363 362 1 03 420 400 19 46
लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0
दकषकषणी कषतर Southern Region 45279 45226 53 01 45946 45684 262 06
बबहजि Bihar 4945 4945 0 00 5050 5045 5 01
िजमोिि घजटी ननगम DVC 2729 2729 0 00 2874 2874 0 00
झजिखणड Jharkhand 1260 1260 0 00 1339 1284 55 41
ओडडशज Odisha 5624 5224 400 71 5624 5357 268 48
पशशचम बगजल West Bengal 8775 8775 0 00 9130 9123 7 01
मसशककम Sikkim 86 86 0 00 90 90 0 00
अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7
परवी कषतर Eastern Region 22959 22567 392 17 22959 22567 392 17
अरणजचल परिश Arunachal Pradesh 138 125 13 94 138 133 5 37
असम Assam 1785 1704 81 45 1865 1809 56 30
मणणपि Manipur 187 185 2 11 193 186 7 36
मघजलय Meghalaya 336 336 0 00 371 368 2 07
ममज़ोिम Mizoram 99 97 2 20 103 98 4 41
नजगजलड Nagaland 134 131 3 22 156 138 18 117
बिपिज Tripura 269 269 0 00 298 293 5 17
उततर-परवी कषतर North-Eastern Region 2790 2700 90 32 2967 2850 117 39
समपणण भारत All India 172945 170604 2341 14 177022 175528 1494 08
24
अधिकतम वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Peak Power Supply Position Report (Provisional)
आकड़ मगज वजट नट Figures in MW netअपरल2018 -अकरबर2018 April2018 to October2018
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
मजग की पनता म कमी Demand not Met
Excludes the supply to Bangladesh
राजयStateअकरबर2018 October2018
मजग की पनता म कमी Demand not Met
File NoCEA-CH-14-1142018-Coordination Division
आकड़ मममलयन यननट नट Figures in MU net
ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied
कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )
चडीगढ़ Chandigarh 141 141 0 00 947 947 0 00
दिलली Delhi 2925 2924 1 00 20034 20021 13 01
हरियजणज Haryana 4794 4794 0 00 30651 30651 0 00
दहमजचल परिश Himachal Pradesh 876 853 24 27 4940 4773 167 34
रमम कशमीि Jammu amp Kashmir 1520 1246 274 180 9485 7646 1839 194
परजब Punjab 5575 5575 0 00 34414 34401 13 00
िजरसथजन Rajasthan 6202 6201 0 00 38594 38434 160 04
उतति परिश Uttar Pradesh 10211 10124 86 08 65349 64836 513 08
उततिजखड Uttarakhand 1162 1149 13 11 7311 7229 82 11
उततरी कषतर Northern Region 33405 33008 398 12 211725 208939 2786 13
छततीसगढ़ Chhattisgarh 2403 2388 15 06 13665 13638 27 02
गरिजत Gujarat 10122 10122 0 00 59146 59132 14 00
मधय परिश Madhya Pradesh 5492 5491 1 00 32552 32551 1 00
महजिजषटर Maharashtra 13615 13612 3 00 80266 80260 6 00
िमन औि दिउ Daman amp Diu 221 221 0 00 1306 1306 0 00
िजिि व नगि हवली Dadra amp Nagar Haveli 551 551 0 00 3204 3204 0 00
गोवज Goa 339 339 0 00 2131 2128 2 01
पशचिमी कषतर Western Region 32742 32723 19 01 192270 192220 50 00
आनधर परिश Andhra Pradesh 5294 5287 7 01 31518 31480 37 01
तलगजनज Telangana 6279 6272 8 01 31503 31463 40 01
कनजाटक Karnataka 5701 5693 8 01 33269 33225 45 01
किल Kerala 2050 2026 24 12 12140 12063 76 06
तममल नजड Tamil Nadu 8971 8959 12 01 57131 57065 66 01
पडचिी Puducherry 226 224 2 08 1438 1431 7 05
लकष-दवीप Lakshadweep 4 4 0 0 23 23 0 0
दकषकषणी कषतर Southern Region 28520 28460 60 02 166998 166727 271 02
बबहजि Bihar 2839 2793 46 16 16400 16213 188 11
िजमोिि घजटी ननगम DVC 1901 1750 151 79 11384 11130 254 22
झजिखणड Jharkhand 740 723 17 22 4321 4252 69 16
ओडडशज Odisha 2921 2918 3 01 17077 17058 19 01
पशशचम बगजल West Bengal 4902 4879 23 05 28804 28681 123 04
मसशककम Sikkim 39 39 0 01 239 239 0 01
अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 67 173 162 12 67
परवी कषतर Eastern Region 13341 13102 240 18 78225 77573 652 08
अरणजचल परिश Arunachal Pradesh 74 73 1 10 435 429 6 14
असम Assam 950 914 36 38 5320 5094 226 43
मणणपि Manipur 70 69 1 11 414 408 6 15
मघजलय Meghalaya 150 150 0 01 896 896 0 01
ममज़ोिम Mizoram 58 57 1 12 302 297 5 16
नजगजलड Nagaland 80 72 8 104 464 414 50 108
बिपिज Tripura 192 191 1 07 895 878 17 19
उततर-परवी कषतर North-Eastern Region 1575 1527 48 31 8726 8415 311 36
समपणण भारत All India 109584 108819 765 07 657944 653873 4071 06
Energy not Supplied Energy not Supplied
ससतबर2018 September2018 अपरल2018 -ससतबर2018 April2018 to September2018
ऊरजा पनत ा म कमी ऊरजा पनत ा म कमी
Excludes energy exported to Bangladesh
राजयState
ऊराण वरवदयत आपरतण शथिरत ररपोरण (सशोधित) Energy Power Supply Position Report (Revised)
25
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
File NoCEA-CH-14-1142018-Coordination Division
अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met
कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )
चडीगढ़ Chandigarh 293 293 0 00 369 369 0 00
दिलली Delhi 5358 5358 0 00 7016 7016 0 00
हरियजणज Haryana 9008 9008 0 00 10270 10270 0 00
दहमजचल परिश Himachal Pradesh 1466 1466 0 00 1479 1479 0 00
रमम कशमीि Jammu amp Kashmir 2951 2361 590 200 2951 2361 590 200
परजब Punjab 11405 11405 0 00 12638 12638 0 00
िजरसथजन Rajasthan 10612 10612 0 00 11698 11698 0 00
उतति परिश Uttar Pradesh 18346 18121 225 12 20498 20062 436 21
उततिजखड Uttarakhand 1996 1996 0 00 2143 2143 0 00
उततरी कषतर Northern Region 56407 55649 758 13 63166 61726 1440 23
छततीसगढ़ Chhattisgarh 4404 4075 328 75 4404 4136 268 61
गरिजत Gujarat 16963 16963 0 00 17053 16963 90 05
मधय परिश Madhya Pradesh 8811 8771 41 05 8811 8775 36 04
महजिजषटर Maharashtra 22455 22349 106 05 23395 23254 141 06
िमन औि दिउ Daman amp Diu 357 356 1 02 357 356 1 02
िजिि व नगि हवली Dadra amp Nagar Haveli 816 815 1 01 816 815 1 01
गोवज Goa 596 596 0 00 596 596 0 00
पशचिमी कषतर Western Region 52933 52895 38 01 53841 52895 945 18
आनधर परिश Andhra Pradesh 9435 9416 19 02 9435 9416 19 02
तलगजनज Telangana 10815 10815 0 00 10815 10815 0 00
कनजाटक Karnataka 10103 10090 13 01 10690 10688 2 00
किल Kerala 3888 3638 251 64 4050 3997 53 13
तममल नजड Tamil Nadu 14556 14553 3 00 15029 14981 47 03
पडचिी Puducherry 390 372 17 45 420 400 19 46
लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0
दकषकषणी कषतर Southern Region 45542 45428 114 02 45946 45684 262 06
बबहजि Bihar 5050 5045 5 01 5050 5045 5 01
िजमोिि घजटी ननगम DVC 2641 2641 0 00 2874 2874 0 00
झजिखणड Jharkhand 1233 1233 0 00 1339 1284 55 41
ओडडशज Odisha 4906 4906 0 00 5357 5357 0 00
पशशचम बगजल West Bengal 8644 8639 5 01 9130 9123 7 01
मसशककम Sikkim 78 78 0 00 90 90 0 00
अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7
परवी कषतर Eastern Region 22110 22100 10 00 22470 22290 180 08
अरणजचल परिश Arunachal Pradesh 132 130 2 15 138 133 5 37
असम Assam 1865 1809 56 30 1865 1809 56 30
मणणपि Manipur 184 182 2 13 193 186 7 36
मघजलय Meghalaya 317 317 0 00 371 368 2 07
ममज़ोिम Mizoram 95 93 2 23 103 98 4 41
नजगजलड Nagaland 142 138 5 32 156 138 18 117
बिपिज Tripura 296 293 3 10 298 293 5 17
उततर-परवी कषतर North-Eastern Region 2921 2850 71 24 2967 2850 117 39
समपणण भारत All India 177022 175528 1494 08 177022 175528 1494 08
26
मजग की पनता म कमी मजग की पनता म कमी Demand not MetDemand not Met
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
Excludes the supply to Bangladesh
अधिकतम वरवदयत आपरतण शथिरत ररपोरण (सशोधित) Peak Power Supply Position Report (Revised)
आकड़ मगज वजट नट Figures in MW net
राजयStateससतबर2018 September2018 अपरल2018 -ससतबर2018 April2018 to September2018
File NoCEA-CH-14-1142018-Coordination Division
अकरबर2018 October2018अपरल2018 -अकरबर2018 April2018 to October2018
उततरी कषतर Northern Region
चडीगढ़ Chandigarh Data not received Data not received
दिलली Delhi
हरियजणज Haryana
दहमजचल परिश Himachal Pradesh
रमम कशमीि Jammu amp Kashmir Data not received Data not received
परजब Punjab
िजरसथजन Rajasthanउतति परिश Uttar Pradesh
उततिजखड Uttarakhand
पशचिमी कषतर Western Region
छततीसगढ़ Chhattisgarh
गरिजत Gujarat
मधय परिश Madhya Pradesh
महजिजषटर Maharashtra
गोवज Goa
दकषकषणी कषतर Southern Region
आनधर परिश Andhra Pradesh
तलगजनज Telangana
कनजाटक Karnataka
किल Kerala
तममल नजड Tamil Nadu
पडचिी Puducherryपरवी कषतर Eastern Region
बबहजि Bihar
झजिखणड Jharkhand
ओडडशज Odisha
पशशचम बगजल West Bengal
N
o No
tified
Cuts
N
o No
tified
Cuts
27
अकरबर 2018 म इडथरीर पर वरवदयत करौती का वरवरवरण Notified Power CutsRestrictions on Industries during October2018
राजय कषतर State Regionऊराणमाग करौती EnergyDemand Cut
No Notified Cuts No Notified Cuts
File NoCEA-CH-14-1142018-Coordination Division
अकरबर2018 October2018अपरल2018 -अकरबर2018 April2018 to October2018
उततरी कषतर Northern Region
चडीगढ़ Chandigarh Data not received Data not received
दिलली Delhi Data not received Data not received
हरियजणज Haryana 940 hrsday 0709 - 0950 hrsday
दहमजचल परिश Himachal Pradesh No cut imposed on agriculture consumers and uninterrupted
power is being supplied to agriculture sector
HPSEBL has only 2 agriculture consumers and uninterrupted
power is being supplied to agriculture sector
रमम कशमीि Jammu amp Kashmir Data not received Data not received
परजब Punjab 0507 hrsday 0349 - 0844 hrsday
िजरसथजन Rajasthan 0630 hrsday 0630 hrsday
उतति परिश Uttar Pradesh 1825 hrsday 1814 - 1858 hrsday
उततिजखड Uttarakhand 2350 hrsday 2128 - 2357 hrsday
पशचिमी कषतर Western Region
छततीसगढ़ Chhattisgarh 18hoursday 18 hrsday
गरिजत Gujarat 805 hrsday 805 hrsday
मधय परिश Madhya Pradesh Three-Phase Supply(Irrigation)-947 hrs day
Three-Phase (Mixed) Supply - 2311 hrs day
Three-Phase Supply(Irrigation)- 0933 - 0947 hrs day Three-
Phase (Mixed) Supply - 2300 - 2320 hrs day
महजिजषटर Maharashtra Three-Phase Supply(Irrigation)- 9 hrs day
Three-Phase (Mixed) Supply - 24 hrs day
Three-Phase Supply(Irrigation)- 9 hrs day
Three-Phase (Mixed) Supply - 24 hrs day
गोवज Goa No restriction No restriction
दकषकषणी कषतर Southern Region
आनधर परिश Andhra Pradesh 07 hrsday 07 hrsday
तलगजनज Telangana 24 hoursday 24 hoursday
कनजाटक Karnataka 6 hrsday 6 hrsday
किल Kerala No Restrictions No Restrictions
तममल नजड Tamil Nadu 9 hrsday (6 hrs during day time and 3 hrs during night time) 9 hrsday (6 hrs during day time and 3 hrs during night time)
पडचिी Puducherry No Restrictions No Restrictions
परवी कषतर Eastern Region
बबहजि Bihar About 18 hrsday About 18 hrsday
झजिखणड Jharkhand About 20 hrsday About 20 hrsday
ओडडशज Odisha 24 hrsday 24 hrsday
पशशचम बगजल West Bengal About 23 hrsday About 23 hrsday
28
अकटबर 2018 कषि कषतर को षिदयत आपरति का षििरण Power Supply to Agricultural Sector during October2018
राजय कषतर State Regionऔसत वरवदयत आपरतण घनरो म Average Hours of Supply
On segregated feeders
File NoCEA-CH-14-1142018-Coordination Division
SNo Contents Page
1 Growth of Installed Capacity since 6th Plan 29
2 Progress of Transmission Sector since 6th Plan 30
3 All India Yearly Coal consumption for Power Generation (Utilities)
4 All India Annual Per Capita Consumption of Electricity since -2006
5 Average cost of power supply amp Average realisation (Paisakwh)
6 Growth of Rural Electrification amp Pump Sets Energisation
7 Status of Hydro Schemes Cleared by the CEA in Oct-2018
Section G - Growth of Power Sector
31
32
File NoCEA-CH-14-1142018-Coordination Division
(In MW)
Coal Gas Diesel Total
End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472
End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634
End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537
End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596
End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921
End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703
End of 12th Plan 19216288 2532938 83763 21832988 6780 4447842 50018 31960630
Up to Oct-2018 19599250 2493722 837629 22176734 6780 4548742 7201281 34604757
Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-17) = 51529 MW
Electricity Generation (MU) Targets and Achievements for 2016-17
Coal Gas Diesel Nuclear Hydro Res Total
1959925 2493722 837629 678000 454874 72012805 22925174
29
1 Growth of Installed Capacity Since 6th Plan
Plan YearThermal
Nuclear Hydro RES (MNRE) Total
Total Installed Capacity 34604757 MW
Coal Gas Diesel Nuclear Hydro Res
File NoCEA-CH-14-1142018-Coordination Division
Progress of Transmission Sector in the Country up to Oct 2018
1 TRANSMISSION LINES (All fig in CKM)
At the end of
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
6th plan 0 0 0 0 0 0 0 0 0 0 0 0 1831 4198 0 6029 1641 44364 0 46005 3472 48562 0 52034
7th plan 0 0 0 0 0 0 0 0 0 0 0 0 13068 6756 0 19824 4560 55071 0 59631 17628 61827 0 79455
8th plan 0 0 0 0 1634 0 0 1634 0 0 0 0 23001 13141 0 36142 6564 73036 0 79600 31199 86177 0 117376
9th plan 0 0 0 0 3234 1504 0 4738 751 409 0 1160 29345 20033 0 49378 8687 88306 0 96993 42017 110252 0 152269
10th plan 0 0 0 0 4368 1504 0 5872 1775 409 0 2184 48708 24730 0 73438 9444 105185 0 114629 64295 131828 0 196123
11th Plan 0 0 0 0 5948 1504 1980 9432 4839 411 0 5250 71023 30191 5605 106819 10140 125010 830 135980 91950 157116 8415 257481
12th Plan 6124 0 0 6124 5948 1504 1980 9432 25465 1177 4598 31240 92482 48240 17065 157787 11014 151276 978 163268 141033 202197 24621 367851
13th Plan (Up
to Mar2018)6124 0 0 6124 5948 1504 1980 9432 28666 1512 4881 35059 98247 54286 19067 171600 11258 156497 1000 168755 150243 213799 26928 390970
13th Plan (Up
to Sep-18)6124 0 0 6124 5948 1504 1980 9432 30952 1512 5059 37523 99683 56069 20662 176414 11318 160958 1000 173276 154025 220043 28701 402769
27150
75050
47900
118050
90650
30
IR addition in 12th Plan (up to
March 2017)
Total IR (up to Oct-18)
IR at the end of 11th Plan
IR at the end of 12th Plan
Envisaged IR Capacity at the end
of 13th Plan
Grand Total
Note - The figure upto the end of 10th plan in for stringing progress including the lines not commissioned Now only commissioned lines are reckoned Accordingly the figure for 10th plan (end) may read as 187555 after adjusting with (-) 10852 Ckm
Inter-regional Power Transfer Capacity
plusmn 800 kV HVDC plusmn 500 kV HVDC 765 kV 400 kV 220 kV
File NoCEA-CH-14-1142018-Coordination Division
2004-05 27800
2005-06 28100
2006-07 30200
2007-08 33000
2008-09 35500
2009-10 36700
2010-11 38700
2011-12 41756
2012-13 45460
2013-14 48940
2014-15 53040
2015-16 54590
2016-17 57430
2017-18 60800
Year
2005-06
2006-07
2007-08
2008-09
2009-10
2010-11
2011-12
2012-13
2013-14
2014-15
2015-16
2016-17
2017-18
2004-05 254 209 7568
2005-06 260 221 7636
2006-07 276 227 7423
2007-08 293 239 7727
2008-09 340 263 8713
2009-10 355 268 8870
2010-11 398 303 11975
2011-12 455 330 13514
2012-13 501 376 14867
2013-14 518 175
2014-15 520
6719
7171
3 All India yearly Coal Consumption for Power Generation (Utilities)
YEARCoal Consumption
Million Tonnes
4 All India Annual per Capita consumption of Electricity Since 2006
Per Capita Consumption ( kWh)
6314
(GrossGen+ Net Import) Mid-year population
5 Average cost of power supply amp average realization ( paiseKWH )
Yearcost of supply
(paiseunit)
Realization(paiseunit)
Including AgricultureOnly
Agriculture
1149
7335
7786
91441
8188
88363
957
1010
1075
1122
File NoCEA-CH-14-1142018-Coordination Division
Source- PFC Reports on the performance of State Power Utilities 31
File NoCEA-CH-14-1142018-Coordination Division
Sl
NoExecuting Agency
Installed
Capacity (MW)Cost (Rs crore)
Date of
Clearance
32
No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification
since 2004-05
65291374575 296361511th Plan
Cumu upto End of 11th Plan
596556 21212860
557439Cummulative up to end of 12th Plan
46708
18423975
499150
2003-042004-05
5743
9769
Cumu upto End of 10th Plan
010407 to 310308
010410 to 310311557976840909
010411 to 310312
412667
86293726
3207
482864
12632
1576036
4451722594
15455554
2314176
397343611750
2093311060316074
65109527813884
6 Growth Of Rural Electrification amp Pumpsets Energisation
Plan Year
9th Plan2002-03
134092626
4111
Pump Sets Energised Villages Electricfied (Nos)
2001-02
284064367244
1218
27801997-981998-991999-002000-01
297594
010408 to 310309010409 to 310310
10th Plan
2005-062006-07
322968331020
Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as
Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received
from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made
available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified
villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is
independent of the earlier published reports
No Hydro Electric Project has been issued concurrenceAppraisal letter by CEA during October 2018
7 Status of Hydro Schemes Cleared by the CEA in Oct-2018
Name of Scheme
File NoCEA-CH-14-1142018-Coordination Division
SN Contents Page
1 Rate of sale of power for the year 2016-17 33-41
RATE OF SALE OF POWER FOR THE YEAR 2016-17
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) NORTHERN REGION
CENTRAL SECTOR
BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 18000 66900 19800
CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 54000 222400 21600
CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 30000 144400 19600
CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 23100 91700 42600
PARBATI - III HPS NHPC LTD HYDRO-HYDRO 52000 68200 54800
DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 28000 95600 30000
CHUTAK NHPC LTD HYDRO-HYDRO 4400 22000 79800
DULHASTI HPS NHPC LTD HYDRO-HYDRO 39000 228000 56400
SALAL HPS NHPC LTD HYDRO-HYDRO 69000 342300 11000
TANAKPUR HPS NHPC LTD HYDRO-HYDRO 9420 43000 29600
URI HPS -I NHPC LTD HYDRO-HYDRO 48000 280300 16000
URI HPS - II NHPC LTD HYDRO-HYDRO 24000 147300 48600
NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 4500 24600 88200
SEWA - II NHPC LTD HYDRO-HYDRO 12000 47100 43400
ANTA CCPP NTPC LTD THERMAL-GASN 41930 67539 32400
AURAIYA CCPP NTPC LTD THERMAL-GASN 66336 53501 39100
BADARPUR TPS NTPC LTD THERMAL-COAL 70500 159153 44800
DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 84000 296170 42300
DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 98000 526686 46300
DADRI CCPP NTPC LTD THERMAL-GASHSD 82978 227469 33000
FARIDABAD CCPP NTPC LTD THERMAL-GASN 43159 115577 30800
RIHAND STPS I NTPC LTD THERMAL-COAL 100000 596766 24500
RIHAND STPS II NTPC LTD THERMAL-COAL 100000 737069 24600
RIHAND STPS III NTPC LTD THERMAL-COAL 100000 706546 30600
SINGRAULI STPS NTPC LTD THERMAL-COAL 200000 1394068 20400
TANDA TPS NTPC LTD THERMAL-COAL 44000 295438 40800
UNCHAHAR TPS I NTPC LTD THERMAL-COAL 42000 256454 39800
UNCHAHAR TPS II NTPC LTD THERMAL-COAL 42000 273577 38900
UNCHAHAR TPS III NTPC LTD THERMAL-COAL 21000 142780 43000
KOLDAM NTPC LTD HYDRO-HYDRO 80000 363260 43600
NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 303575 25841
RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 108000 668677 35374
NJHPS SJVNL HYDRO-HYDRO 150000 699496 23820
RAMPUR HPS SJVNL HYDRO-HYDRO 41202 195982 32260
TEHRI HPP THDC HYDRO-HYDRO 100000 272543 51800
KOTESHWAR HEP THDC HYDRO-HYDRO 40000 106244 53400
IGSTPS JHAJJAR ARAVALI P CPL THERMAL-COAL 150000 510429 49490
NEYVELI BARSINGSAR NEYVELI LIG CORP LTD THERMAL-LIG 25000 127520 38040
STATE SECTOR
PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 21000 14222 48200
PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 21000 19205 48400
PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 25000 102257 42600
PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 25000 62107 41800
DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 60000 312213 41000
RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 120000 35767442200
WYC HYDEL STATION HPGCL HYDRO-HYDRO 6240 20365 24900
GIRI POWER HOUSE HPSEB HYDRO-HYDRO 6000 13958 7600
ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 1695 5467 11900
BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 12000 18528 6700
GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 2250 7462 22500
BASSI POWER HOUSE HPSEB HYDRO-HYDRO 6600 29649 7500
BINWA POWER HOUSE HPSEB HYDRO-HYDRO 600 2749 19300
ANNEXURE-I
RATE OF SALE OF POWER FOR THE YEAR 2016-2017
Page 33
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) GAJ POWER HOUSE HPSEB HYDRO-HYDRO 1050 2914 26700
BANER POWER HOUSE HPSEB HYDRO-HYDRO 1200 2864 16200
HOLI POWER HOUSE HPSEB HYDRO-HYDRO 300 616 22500
THIROT POWER HOUSE HPSEB HYDRO-HYDRO 450 1126 22500
KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 1200 3064 22500
LARJI POWER HOUSE HPSEB HYDRO-HYDRO 12600 53677 23700
NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 250 750 31000
CHABA POWER HOUSE HPSEB HYDRO-HYDRO 175 465 23300
RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 150 101 13400
SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 200 000 22500
KILLAR HPSEB HYDRO-HYDRO 030 050 22500
BHABA AUGUMENP H HPSEB HYDRO-HYDRO 450 1276 22500
BS CHAMBA HPSEB HYDRO-HYDRO 045 099 19500
GUMMA HPSEB HYDRO-HYDRO 300 423 22500
GAS TURBINE POWER STATION IPGCL THERMAL-GAS 27000 67233 39300
PPS-I PPCL THERMAL-GAS 33000 175905 38300
PPS-III PPCL THERMAL-GAS 137120 196879 36100
LOWER JHELUM JampKPDD HYDRO-HYDRO 10500 60214 5100
UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 2260 10514 6300
UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 10500 44202 8500
GANDHARBAL JampKPDD HYDRO-HYDRO 1500 8925 4700
KARNAH MPH JampKPDD HYDRO-HYDRO 200 1122 31000
CHENANI I JampKPDD HYDRO-HYDRO 2330 10892 6600
CHENANI II JampKPDD HYDRO-HYDRO 200 1188 9300
CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 750 3634 14200
IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 375 2108 18500
IGO MERCHELLONG JampKPDD HYDRO-HYDRO 300 1572 29700
PAHALGAM MHP JampKPDD HYDRO-HYDRO 450 1713 32900
MARPACHOO JampKPDD HYDRO-HYDRO 075 375 29800
HAFTAL JampKPDD HYDRO-HYDRO 100 483 28700
SANJAK JampKPDD HYDRO-HYDRO 126 441 36000
SEWA-III JampKPDD HYDRO-HYDRO 900 3273 20200
BHADERWAH JampKPDD HYDRO-HYDRO 150 935 8900
BAZGO JampKPDD HYDRO-HYDRO 030 108 33300
SUMOOR JampKPDD HYDRO-HYDRO 010 045 35400
HUNDER JampKPDD HYDRO-HYDRO 040 176 26200
STAKNA JampKPDD HYDRO-HYDRO 400 1933 4100
KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 124000 662879 31360
SURATGARH TPS RRVUNL THERMAL-COAL 150000 402328 41730
CHHABRA TPS 1amp 2 RRVUNL THERMAL-COAL 50000 305946 36700
CHHABRA TPS 3 RRVUNL THERMAL-COAL 25000 151536 36700
CHHABRA TPS 4 RRVUNL THERMAL-COAL 25000 155896 36700
RAMGARH GT POWER PROJECT RRVUNL THERMAL-COAL 22050 43177 41800
RAMGARH GAS T P PROJECT 3 RRVUNL THERMAL-GAS 5000 93615 41800
DHOLPUR C C POWER PROJECT RRVUNL THERMAL-R-LNG 33000 9486 46110
MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 14000 20855 34192
MINI MICRO HYDEL (MMH) P S RRVUNL HYDRO-HYDRO 2385 851 37800
KALISINDH TPP 1 RRVUNL THERMAL-COAL 60000 341543 45000
KALISINDH TPP 2 RRVUNL THERMAL-COAL 60000 211588 45000
KHARA HEP UPJVNL HYDRO-HYDRO 7200 26654 7200
MATATILLA HEP UPJVNL HYDRO-HYDRO 3060 12219 6500
OBRA HEP UPJVNL HYDRO-HYDRO 9900 21517 6300
RIHAND UPJVNL HYDRO-HYDRO 30000 57369 5500
ANPARA A TPS UPRVUNL THERMAL-COAL 63000 317536 27000
ANPARA B TPS UPRVUNL THERMAL-COAL 100000 705605 22700
ANPARA D UPRVUNL THERMAL-COAL 100000 300158 39800
HARDUAGANJ TPS UPRVUNL THERMAL-COAL 16500 45817 49200
HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 50000 304389 46600
OBRA A TPS UPRVUNL THERMAL-COAL 28800 13158 34000
OBRA B TPS UPRVUNL THERMAL-COAL 100000 328124 21900
Page 34
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) PANKI TPS UPRVUNL THERMAL-COAL 21000 66488 50300
PARICHHA TPS UPRVUNL THERMAL-COAL 22000 38762 49400
PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 42000 231931 45600
PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 50000 276722 50400
CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 24000 70845 8290
CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 14400 75366 8390
DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 3375 9595 12080
DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 5100 18701 10520
KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4140 17359 12330
KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 12000 33001 9420
KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 3000 11953 8320
TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 9000 33983 12460
MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 30400 124510 16110
RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 19800 17897 10550
MPUR UTTARAKHAND JVNL HYDRO-HYDRO 930 5121 19200
PATHRI UTTARAKHAND JVNL HYDRO-HYDRO 2040 11636 14200
GALOGI UTTARAKHAND JVNL HYDRO-HYDRO 300 648 12500
PRIVATE SECTOR
MGTPP CLP INDIA PVT LTD THERMAL-COAL 132000 268902 41940
SHRINAGAR HEP ALAKNANDA HPCL HYDRO-HYDRO 33000 127414 48800
GAMA INFRAPROP CCPP GAMA INFRAPROP PVT THERMAL-GAS 22500 52686 47000
PPGCL (BARA) JP POWER VENTURES LTD THERMAL-COAL 198000 448200 38500
MALANA HEP MALANA PCL HYDRO-HYDRO 8600 26354 29792
MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 10000 30369 32580
ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 19200 56347 36079
KASHANG HEP H P PCL HYDRO-HYDRO 19500 5034 29200
BASPA-II HEP HBPCL HYDRO-HYDRO 30000 132769 13600
KARCHAM WANGTOO HEP HBPCL HYDRO-HYDRO 100000 434386 36600
RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 108000 582600 43700
RITHALA COMBI CY POWER PLANT TATA POWER DDL THERMAL-GAS 9480 000 11900
RAJPURA TPS NABHA POWER LTD THERMAL-GAS 140000 901484 39000
TALWANDI SABO POWER LTD TALWANDI SABO POWER LTD THERMAL-COAL 198000 636040 49548
ROJA THERMAL POWER STATION ROJA POWER SCL THERMAL-COAL 120000 727200 43400
KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 34400 63400
BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 36000 62600
MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 38200 60800
UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 37900 61500
KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 42300 58800
LALITPUR PGCL BAJAJ ENERGY PVT LTD THERMAL-COAL 198000 359400 47300
PRAYAGRAJ PGCL PRAYAGRAJ PGCL THERMAL-COAL 132000 448200 38595
KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 132000 783182 33438
WESTERN REGION
CENTRAL SECTOR
INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 100000 325333 23892
OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 52000 141663 34001
GANDHAR CCPP NTPC LTD THERMAL-GAS 65739 221924 28700
KAWAS CCPP NTPC LTD THERMAL-GASN 65620 167929 27000
KORBA I amp II NTPC LTD THERMAL-COAL 210000 1499171 20500
KORBA III NTPC LTD THERMAL-COAL 50000 358746 26600
SIPAT STPS I NTPC LTD THERMAL-COAL 198000 1479902 26800
SIPAT STPS II NTPC LTD THERMAL-COAL 100000 766549 26500
VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 126000 693142 25800
VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 100000 608781 23800
VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 100000 673475 27600
VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 100000 655924 32900
VINDHYACHAL STPS V NTPC LTD THERMAL-COAL 50000 328265 31700
MOUDA I NTPC LTD THERMAL-COAL 100000 343130 44500
MOUDA Ii NTPC LTD THERMAL-COAL 66000 40637 39900
RATNAGIRI GAS amp POWER PVT LTD RGPPL THERMAL-GAS 196708 442485 47000
KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 000 24729
TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 32000 201227 10740
Page 35
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 365122 19069
TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 787444 29324
STATE SECTOR
GSEG-HAZIRA15610 MW GUJARAT S ENEGEN LTD THERMAL-GAS 15610 1805 28200
GSEG-HAZIRA35143 MW GUJARAT S ENEGEN LTD THERMAL-GAS 35130 22276 51300
GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 21978 51800
AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 13929 26100
KORBA TPS EAST CSPGCL THERMAL-COAL 44000 198673 33880
DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 365808 27570
KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 316500 30420
HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 532878 19410
CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 515 58300
MTTPS CHAMPA U-I CSPGCL THERMAL-COAL 50000 220376 39000
MTTPS CHAMPA U-II CSPGCL THERMAL-COAL 50000 23709 10000
SHP GANGREL CSPGCL HYDRO-HYDRO 1000 2350 36790
BANGO HEP CSPGCL HYDRO-HYDRO 12000 14662 8900
MHP KORBA WEST CSPGCL HYDRO-HYDRO 170 859 38190
SIKASAR HEP CSPGCL HYDRO-HYDRO 700 418 26870
DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8843 74500
DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 19446 51500
GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 66388 71600
GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127488 41300
KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 96072 43900
KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 29841 56400
SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 184966 58800
UKAI 1-5 GSECL THERMAL-COAL 85000 204891 46900
UKAI TPS 6 GSECL THERMAL-COAL 50000 284448 48200
WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 271999 58300
WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 82808 44100
KADANA HPS GSECL HYDRO-HYDRO 24200 34433 16800
UKAI HPS GSECL HYDRO-HYDRO 30500 40585 6100
TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 123000 11500
BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 8900 10900
BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 7200 27500
JHINNA HPS MPPGCL HYDRO-HYDRO 2000 9700 18500
RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 44300 3400
GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 17300 4600
SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 4100 16900
MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 14600 27000
PENCH HPS MPPGCL HYDRO-HYDRO 16000 23700 8100
RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 3000 16900
AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 134400 35100
SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 283800 38700
SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 344600 34300
SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 111600 61600
SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 211800 58000
SSTPS PH-I MPPGCL THERMAL-COAL 120000 233100 84300
BHUSAWAL TPS MSPGCL THERMAL-COAL 142000 566258 51100
CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1365682 33700
KHAPERKHEDA MSPGCL THERMAL-COAL 134000 706207 39100
KORADI TPS MSPGCL THERMAL-COAL 62000 443206 42000
NASIK TPS MSPGCL THERMAL-COAL 63000 297275 47000
PARLI TPS MSPGCL THERMAL-COAL 113000 175934 71600
PARAS MSPGCL THERMAL-COAL 50000 267931 38700
URAN CCPP MSPGCL THERMAL-GAS 67200 320330 30600
KOYANA MSPGCL HYDRO-HYDRO 195600 328155 13100
SMALL HYDRO POWER PLANTS MSPGCL HYDRO-HYDRO 45400 93062 30500
BHIRA MSPGCL HYDRO-HYDRO 8000 10046 8400
TILLARI MSPGCL HYDRO-HYDRO 8900 10584 3100
SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 233298 20500
SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 87633 20500
PRIVATE SECTOR
Page 36
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 81282 46750
JNSTPP(JAYPEE NIGRIE) JP POWER VENTURES LTD THERMAL-COAL 132000 726695 29310
MB POWER MB POWER THERMAL-COAL 120000 345632 38310
ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 754922 28671
ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 780761 23495
ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 198000 1263784 32090
ADANI POWER MAHARA ADANI POWER LTD THERMAL-COAL 330000 1666191 34124
AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 170065 36827
SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 252035 45129
ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 458551 36000
ESSAR POWER MP LTD ESSAR POWER MP LTD THERMAL-COAL 60000 243040 28600
VEDANTA LTD (P P -I) VEDANTA LTD THERMAL-GAS 3000 15044 24000
VEDANTA LTD (P P -II) VEDANTA LTD THERMAL-GAS 3000 21293 24000
PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 8234600 24000
165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 5850 64390
145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 68717 40349
SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 132655 28776
SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 144686 38567
MUNDRA UMPPCOASTAL GUJARAT POWER
LTD THERMAL-IMP COAL 400000 2530300
23900
LANCO AMARKANTAK TPP PATHADIH
U-ILANCO AMARKAN POWER LTD THERMAL-COAL 30000 195500
29200
LANCO AMARKANTAK TPP PATHADIH
U-IILANCO AMARKAN POWER LTD THERMAL-COAL 30000 206900
27600
BARADARHA TPS D B POWER LTD THERMAL-COAL 120000 677373 29200
JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 405000 28900
JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 453000 40500
DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 339437 40700
TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 293400 44000
TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 137200 37000
TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 174900 44000
BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 92900 14100
BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23700 34300
KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 27600 48300
CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2530300 23900
BHANDARDRA HEP -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 2475 54900
SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 161400 26500
SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 445000 39000
SOTHERN REGION
CENTRAL SECTOR
NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 325699 54820
NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 305532 39880
NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 998805 38510
NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 113016 54070
NEYVELI TAMILNADU POWER LTD JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 625274 42200
VALLUR TPS NTPC TECL THERMAL-COAL 150000 856438 42350
R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 1493 84300
RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1502919 29400
RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 341291 31800
SIMHADRI I NTPC LTD THERMAL-COAL 100000 688382 36800
SIMHADRI II NTPC LTD THERMAL-COAL 100000 663657 43400
KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 593110 31324
MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 291625 21764
KKNPP-1 amp 2 NPCIL NUCLEAR-NUCLEAR 200000 572609 40948
MINICOY LAKSHADEEP THERMAL-DIESEL 340 770 29600
KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1097 29600
AMINI LAKSHADEEP THERMAL-DIESEL 265 509 29600
ANDROTT LAKSHADEEP THERMAL-DIESEL 219 524 29600
KALPENI LAKSHADEEP THERMAL-DIESEL 175 356 29600
AGATTI LAKSHADEEP THERMAL-DIESEL 195 658 29600
KADMAT LAKSHADEEP THERMAL-DIESEL 190 414 29600
KILTAN LAKSHADEEP THERMAL-DIESEL 150 269 29600
CHETLET LAKSHADEEP THERMAL-DIESEL 100 139 29600
BITRA LAKSHADEEP THERMAL-DIESEL 043 024 29600
BANGARAM LAKSHADEEP THERMAL-DIESEL 018 009 29600
Page 37
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) STATE SECTOR
Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 721811 46500
Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 50000 336142 46500
RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 237358 46500
RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 239926 46500
RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 124500 46500
SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 62109 46500
UPPER SILERU APGENCO HYDRO-HYDRO 24000 33000 46500
LOWER SILERU APGENCO HYDRO-HYDRO 46000 81066 46500
DONKARAI APGENCO HYDRO-HYDRO 2500 6007 46500
PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 1262 46500
CHETTIPETA APGENCO HYDRO-HYDRO 100 214 46500
MUCHKUND APGENCO HYDRO-HYDRO 12000 37571 46500
NAGARJUNASAGAR RCPH APGENCO HYDRO-HYDRO 9000 606 46500
TUNGABHADRA HES amp HAMPI(AP
Share)
APGENCO HYDRO-HYDRO 7200 6100 46500
KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 352232 42600
KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 288131 32500
KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 319272 46500
RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 40073 44300
KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 308317 46000
KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 308963 51300
SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 61004 76600
NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 17960 75300
PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 20873 58300
POCHAMPAD-I TSPGENCO HYDRO-HYDRO 2700 5455 29800
POCHAMPAD-II TSPGENCO HYDRO-HYDRO 900 1932 40700
NIZAMSAGAR TSPGENCO HYDRO-HYDRO 1000 1126 53400
RAICHUR TPS 1 to 7 KPCL THERMAL-COAL 147000 890866 43800
RAICHUR TPS 8 KPCL THERMAL-COAL 25000 159523 48200
BELLARI TPS 1 KPCL THERMAL-COAL 50000 318679 51100
BELLARI TPS 2 KPCL THERMAL-COAL 50000 232347 55600
BELLARI TPS 3 KPCL THERMAL-COAL 70000 47565 34400
BHADRA PH KPCL HYDRO-HYDRO 3920 2369 45900
GERUSUPPA PH KPCL HYDRO-HYDRO 24000 26990 22000
GHAT PRABHA HEP KPCL HYDRO-HYDRO 3200 4777 25300
KADRA HPS KPCL HYDRO-HYDRO 15000 16889 26800
NAGJHARI KPCL HYDRO-HYDRO 90000 155159 9800
KODASALLI DPH KPCL HYDRO-HYDRO 12000 14854 19200
MUNIRA+MGH+SPH+SPH KPCL HYDRO-HYDRO 22640 48211 7900
SHARAVATHY HPS KPCL HYDRO-HYDRO 108550 276215 5400
ALMATTI DPH KPCL HYDRO-HYDRO 29000 39611 24600
VARAHI UGPH KPCL HYDRO-HYDRO 46000 71368 15600
IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 17196 15300
IDUKKI HPS KSEB HYDRO-HYDRO 78000 137905 15300
KAKKAD HPS KSEB HYDRO-HYDRO 5000 13063 15300
KALLADA HPS KSEB HYDRO-HYDRO 1500 4436 15300
KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 46544 15300
KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 635 15300
LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 30822 15300
MALANKARA HPS KSEB HYDRO-HYDRO 1050 2474 15300
MATTUPETTY KSEB HYDRO-HYDRO 200 230 15300
MALAMPUZHA KSEB HYDRO-HYDRO 250 063 15300
CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 864 15300
URUMI ST I amp II KSEB HYDRO-HYDRO 615 903 15300
LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 248 15300
NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7765 19625 15300
PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 16601 15300
PANNIAR HPS KSEB HYDRO-HYDRO 3240 6217 15300
PORINGALKUTHU KSEB HYDRO-HYDRO 3600 10052 15300
PORINGALKUTHU LBE KSEB HYDRO-HYDRO 1600 9438 15300
PEPPARA KSEB HYDRO-HYDRO 300 395 15300
POOZHITHODE KSEB HYDRO-HYDRO 480 1045 15300
Page 38
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) PEECHI KSEB HYDRO-HYDRO 125 040 15300
RANI-PERUNADU KSEB HYDRO-HYDRO 400 585 15300
SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 79783 15300
SENGULAM HPS KSEB HYDRO-HYDRO 5120 11558 15300
SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 16711 15300
VILANGAD KSEB HYDRO-HYDRO 750 1578 15300
BARAPOLE KSEB HYDRO-HYDRO 1500 1932 15300
VELLATHOOVAL KSEB HYDRO-HYDRO 360 305 15300
CHIM0NY KSEB HYDRO-HYDRO 250 156 15300
ADYANPARA KSEB HYDRO-HYDRO 350 501 15300
BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 554 15300
KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 3801 15300
KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 23132 32800
ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 14416 62280
METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 523970 62280
METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 321270 62280
NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 336575 62280
NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 591240 62280
TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 508966 62280
KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 30897 62280
VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 18720 90699 62280
KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 33593 62280
BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 1047 62280
PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 1250 62280
PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 330 62280
MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 4897 62280
MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 032 62280
KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15681 62280
KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 40608 62280
KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 21342 62280
KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 4717 62280
KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4322 62280
KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2399 62280
METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 4416 62280
METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 8035 62280
BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2187 62280
BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2359 62280
BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2511 62280
BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 1949 62280
BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 1819 62280
POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 172 62280
SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 241 62280
MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 026 62280
THIRUMOORTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 136 62280
PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 9309 62280
VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 353 62280
SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 4192 62280
PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 6571 62280
SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 1186 62280
SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6319 62280
ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 6122 62280
KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 28674 62280
SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 18381 62280
SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 4258 62280
KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 12680 62280
KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4201 62280
ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 000 62280
PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 19175 62280
AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 078 62280
BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 504 62280
BHAVANI KATTALAI (BKB)(IIIampIII BB I amp II)TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 5847 62280
PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 000 62280
Page 39
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) SRI DAMODARAM STPS APPDCL THERMAL-COAL 160000 808108 36300
PRIVATE SECTOR
KARUPPUR TANJORE LANCO TANJORE PCL THERMAL-GAS 12000 48096 28770
SIMHAPURI ENERGY LTD SIMHAPURI ENERGY LTD THERMAL-COAL 60000 143900 39100
JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 7111 45500
SBU 1 JSW ENERGY LTD
VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 26000 159100
43300
SBU 2 JSW ENERGY LTD
VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 60000 247900
42800
LANCO KPLLANCO KONDAPALLI POWER
LTDTHERMAL-GAS 36814 85060
25776
LANCO KPL STG -IILANCO KONDAPALLI POWER
LTDTHERMAL-GAS 36600 12979
46330
LANCO KPL STG -IIIALANCO KONDAPALLI POWER
LTDTHERMAL-GAS 37100 85710
46330
LANCO KPL STG -III BLANCO KONDAPALLI POWER
LTDTHERMAL-GAS 37100 43639
46330
HINDUJA NATIONAL PCL HINDUJA NATIONAL PCL THERMAL-COAL 104000 303000 38200
MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 121164 49940
UDUPI POWER COR LTD ADANI POWER LTD THERMAL-COAL 120000 754613 42500
SPECTRUM POWER GENERATION
LTD SPECTRUM PG LTD THERMAL-GASN 20525 9256812
34952
TAQA NEYVELI POWER COM PVT
LTD TAQA NEYVELI THERMAL-LIG 25000 5840
34500
ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 251000 51000
ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 207860 36800
GMR VEMAGIRI POWER GENERATION
LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 30117
46450
EASTERN REGION
CENTRAL SECTOR
MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 64675 53113
MTPS STAGE - II KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 39000 1432 69138
BOKARO `B` TPS DVC THERMAL-COAL 63000 145670 31539
MEJIA TPS U 1-3 DVC THERMAL-COAL 63000 348298 31552
MEJIA TPS U 4 DVC THERMAL-COAL 21000 116099 34997
MEJIA TPS U 5-6 DVC THERMAL-COAL 50000 276427 35976
MEJIA TPS U 7-8 DVC THERMAL-COAL 100000 552854 36991
DURGAPUR STEEL TPS DVC THERMAL-COAL 100000 665550 39323
DURGAPUR TPS DVC THERMAL-COAL 21000 59270 35416
RAGHUNATHPUR TPS DVC THERMAL-COAL 120000 201650 35326
MAITHON HYDEL STA DVC HYDRO-HYDRO 6320 12200 17984
CHANDRAPURA TPSU1-3 DVC THERMAL-COAL 42000 257610 35095
CHANDRAPURA TPSU7-8 DVC THERMAL-COAL 50000 306673 34987
KODERMA TPS DVC THERMAL-COAL 100000 380180 38131
PANCHET HPS DVC HYDRO-HYDRO 8000 13360 17984
TILLAYA HPS DVC HYDRO-HYDRO 400 1410 17984
RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34700 35400
TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 277300 23200
TLDP -III NHPC LTD HYDRO-HYDRO 13200 55400 62000
TLDP -IV NHPC LTD HYDRO-HYDRO 16000 60300 25600
FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 957219 33700
FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 308943 41000
BONGAINGAON TPS NTPC LTD THERMAL-COAL 25000 153663 58600
KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 542277 34200
KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 942591 34200
BARH-II NTPC LTD THERMAL-COAL 132000 728021 44500
TALCHER TPS NTPC LTD THERMAL-COAL 46000 335521 30100
TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 702319 25600
TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1436521 24700
STATE SECTOR
BTPS(RampM) BIHAR STATE PGCL THERMAL-COAL 22000 12142 39700
BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 98331 10602
HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 50593 9482
CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 19689 2605
RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 53192 6033
UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 147208 14637
Page 40
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 60353 4519
IB TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 288567 25000
J P H GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 210 038 61100
MEYONG CHU GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 400 1086 61100
TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 122667 38200
DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 214339 43321
KOLAGHAT THERMAL POWER
STATION
WEST BENGAL PDCL THERMAL-COAL 126000 538269 31603
BAKRESHWAR THERMAL POWER
PLANT
WEST BENGAL PDCL THERMAL-COAL 105000 634876 32154
BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 45000 166855 33299
SANTHALDIH THERMAL POWER
STATION
WEST BENGAL PDCL THERMAL-COAL 50000 336442 34932
SAGARDIGHI THERMAL POWER
PROJECT
WEST BENGAL PDCL THERMAL-COAL 160000 423121 34705
JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 20344 68900
RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 24559 68900
TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 4623 68900
PURULIA PUMPED STORAGE
PROJECT
WEST BENGAL SEDCL HYDRO-HYDRO 90000 108816 68900
MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2768 68900
PRIVATE SECTOR
CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 49474 20230
CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 555500 70200
HALDIA ENERGY HALDIA ENERGY LTD THERMAL-COAL 60000 371000 50400
DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3688 63400
KAMALANGA TPS GMR KAMALANGA ENERGY LTD THERMAL-COAL 105000547670
33300
ADHUNIK POWER U-1 ADHUNIK POWER THERMAL-COAL 27000 158 44060
ADHUNIK POWER U-2 ADHUNIK POWER THERMAL-COAL 27000 168 44250
VL-JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 332800 23622
JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 43000 45250
JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 71700 37030
JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 70700 35920
JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 71100 38870
JOJOBERA UNIT 5 TATA POWER COM LTD THERMAL-COAL 12000 79300 44560
JOJOBERA UNIT 6 TATA POWER COM LTD THERMAL-WHR 12000 83700 12840
IEL KALINGANAGAR U-I TATA POWER COM LTD THERMAL-WG 6750 33400 22500
IEL KALINGANAGAR U-II TATA POWER COM LTD THERMAL-WG 6750 34800 22500
MAITHON UNIT 1 amp 2 TATA POWER COM LTD THERMAL-COAL 105000 678000 36100
HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 27500 24340
HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 28400 24340
HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 15800 24310
NORTH EASTERN REGION
CENTRAL SECTOR
LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 74100 36600
AGARTALA GT NEEPCO THERMAL-GAS 13500 88611 27210
ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 153111 32310
DOYANG HEP NEEPCO HYDRO-HYDRO 7500 25598 49801
KOPILI HEP NEEPCO HYDRO-HYDRO 20000 98186 11491
KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 19582 20237
KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 10310 17968
RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 124093 22945
TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 10100 17344 39000
STATE SECTOR
HYDRO POWER (122 Stns) ITANAGAR GOVT OF ARUNACHAL
PRADESHHYDRO-HYDRO 6971 6217270
24600
KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39514 17337
LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 82327 36810
NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 33318 48290
MYNTRIANG SHEP ST II ASSAM POWER GENCO HYDRO-HYDRO 300 567 35776
LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 9130 49200
LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 012 49200
DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 022 49200
TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 000 49200
UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 4990 16000
UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 6476 37000
UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 16494 14600
UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 3600 9556 15000
SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 758 8000
MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44070 44800
KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 154 41400
TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 091 41400
MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 411 41400
MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 394 41400
KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 760 41400
SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 3264 41400
LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 044 41400
BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 18953 28000
ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 43585 28200
GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 4080 11100
Note
LIG Lignite N Naptha WHR Waste Heat Recovery
Page 41
File NoCEA-CH-14-1142018-Coordination Division
Achievement
Oct-18
Thermal 9736 1067
Nuclear 303 -288
Hydro 1262 1287
Bhutan Import 0353 -4146
All India 113364 1019
Type
Thermal
Nuclear
Hydro
Bhutan Import
All India
1A
96003
41664409
9182018
3719257
-551
Change wrt April 2017- Oct
2017
Electricity Generation During April 2017- Oct 2017 amp April 2018- Oct 2018 (BU)
April 2017- Oct 2017 April 2018- Oct 2018
312
10722
49174917171413
102878
0633
62697
22035
502
8797
59698
1 Electricity Generation for Oct-2018 (BU)
Oct-18Type
Achievement
Oct-17
Targets Change
wrt 2017
9443
0603
3533
109320
1118
102878
113364
96000
98000
100000
102000
104000
106000
108000
110000
112000
114000
116000
BU
Oct-17 Oct-18
71413749171
000
10000
20000
30000
40000
50000
60000
70000
80000
BU
April 2017- Oct 2017 April 2018- Oct 2018
File NoCEA-CH-14-1142018-Coordination Division
Generation from
Conventional
Sources
Generation
from
Renewable
Sources
Total Generation from
Conventional Sources
Generation from
Renewable SourcesTotal
Growth in
Conventional
Generation
Growth in
Renewable
Generation
Growth in
Total
Generation
(BU) (BU) (BU) (BU) (BU) (BU) () () ()
113366 8500 121866 102879 6537 109416 1019 3003 1138
Note Tentative
SlNo
Source-Wise All
India
Generation
from
Renewables
Sep-2018 Sep-2017 April 2018- Sept 2018 April 2017- Sept 2017
1 Wind 6093345 3897076 45331034 37069611
2 Solar 3209923 2002513 17912711 10811454
3 Biomass 177174 273211 1382764 1741918
4 Bagasse 231358 270424 3154629 2085272
5 Small Hydro 993983 1021349 5335933 4727041
6 Others 32159 24319 209731 173991
Total 10737943 7488892 73326802 56609286
Note 1) All figures are provisional
2) Data as received from SLDC of the respective states or from the electricity department
Electricity Generation (Conventional and Renewable Sources)
Oct-2018 Oct-2017 Growth
1B
For the Month of Cummulative for the period
All India Generation From Renewables (All Figures are in MU)
File NoCEA-CH-14-1142018-Coordination Division
Achievement Targets Achievement
Oct-17
Thermal 0 1280 600 NA
Hydro 30 0 0 000
Nuclear 0 0 0 NA
All India 30 1280 600 200000
April 2017- Oct 2017 April 2018- Oct 2018 Change
Thermal 4300 670 -84
Hydro 308 140 -55
Nuclear 0 0 NA
All India 4608 810 -82
Note Lakwa Replacement Power Project (69755 MW) had achieved COD on 260418 but
the intimation regarding COD was received in Oct18 (Additional Capacity addition)
2
2 Generating Capacity Addition for Oct-2018 (MW)
Generating Capacity Addition during April 2017- Oct 2017 amp April 2018- Oct 2018
NA- Not Applicable
Change wrt
Oct-2017Type
Oct-18
300
6000
0
100
200
300
400
500
600
700
1Oct-17 Oct-18
0
500
1000
1500
2000
2500
3000
3500
4000
4500
5000
April 2017- Oct 2017 April 2018- Oct 2018
File NoCEA-CH-14-1142018-Coordination Division
(i)
(ii)
(iii)
Nuclear Hydro RES Grand TotalRegion Coal Gas Diesel Total
Northern 5128020 578126 000 5706146 162000 1970777 1363391 9202314
Western 7120862 1080649 000 8201511 184000 754750 2102418 11242679
Southern 4578202 647366 76158 5301726 332000 1183803 3597107 10414636
Eastern 2720164 10000 000 2730164 000 494212 108364 3332740
North-East 52002 177581 3600 233183 000 145200 28745 407128
Islands 000 000 4005 4005 000 000 1256 5261
ALL INDIA 19599250 2493722 83763 22176734 678000 4548742 7201281 34604757
Note Captive Genaration is not included in the total Captive Power capacity as on 31032017 RES as on 30092018 3
Thermal
Nuclear
3 List of Projects Commissioned During Oct-2018
4 All India Installed Capacity (MW) Region-wise as on 31-10-18
Mahan TPP of Essar Power MP ltd of capacity 600 MW was commissioned on 07102018
NIL
Thermal
NIL
Hydro
22176734
678000
4548742
7201281
34604757
51529
000
5000000
10000000
15000000
20000000
25000000
30000000
35000000
40000000
Thermal Nuclear Hydro RES Total Captive
Thermal Nuclear Hydro RES Total Captive
Total = 34604757
File NoCEA-CH-14-1142018-Coordination Division
Sector
Coal Gas Diesel Total
State 6359650 711871 36393 7107913 000 2994200 200887 10303000
Private 7614600 1058060 47370 8720030 000 339400 6850164 15909594
Central 5625000 723791 000 6348791 678000 1215142 150230 8392163
All India 19599250 2493722 83763 22176734 678000 4548742 7201281 34604757
State 10303000
Private 15909594
Central 8392163
Electricity Generation (MU) Targets and Achievements for 2016-17
5 All India Installed Capacity (MW) Sector-wise as on 31-10-18
4
Grand TotalTHERMAL
Nuclear Hydro RES
RES as on 30092018
State 10303000 30
Private 15909594 46
Central 8392163 24
All India Installed Capacity(MW) as on 31-10-2018 (Sector-Wise)
File NoCEA-CH-14-1142018-Coordination Division
Voltage Level
+- 500 KV HVDC
+- 800 KV HVDC
765 KV
400 KV
220 KV
All India
Voltage Level
+- 500 KV HVDC
+- 800 KV HVDC
765 KV
400 kV
220 KV
All India
5
0 0
6 Transmission Lines Added during Oct-2018 (Ckms)
Oct-17 Oct-18
0 0
0 0
0 729
245 737
324 401
569 1867
Transmission Lines Added duringApril 2017- Oct 2017 ampApril 2018- Oct 2018 (Ckms)
April 2017- Oct 2017 April 2018- Oct 2018
2151 4521
13120 11799
0 0
2046 2464
8923 4814
569
1867
0
500
1000
1500
2000
All India
Ckm
s
Oct-17 Oct-18
13120
11799
11000
11500
12000
12500
13000
13500
All India
Ckm
s
April 2017- Oct 2017 April 2018- Oct 2018
File NoCEA-CH-14-1142018-Coordination Division
Voltage Level
+- 800 KV HVDC
+- 500 KV HVDC
765 KV
400 KV
220 KV
All India
Voltage Level
+- 800 KV HVDC
+- 500 KV HVDC
765 KV
400 KV
220 KV
All India
6
7 Transformation Capacity Addition During Oct-2018 (MVA)
0
0
2575
1025
0 0
Oct-17 Oct-18
3600
0
3000
9840
4620
2220
3000 0
All India Transformation Capacity Addition during April 2017- Oct 2017 amp April
2018- Oct 2018 (MVA)
41790
0
14000
17180
10610
45665
10000
23020
9645
0
April 2017- Oct 2017 April 2018- Oct 2018
3600
9840
0
2000
4000
6000
8000
10000
12000
MV
A
Oct-17 Oct-18
4566541790
0
74520
1
MV
A
April 2017- Oct 2017 April 2018- Oct 2018
File NoCEA-CH-14-1142018-Coordination Division
Oct-2017 Oct-2018 Oct-2017 Oct-2018 Oct-2017 Oct-2018
Northern 31786 31822 31096 31375 -22 -14
Western 31728 36308 31628 36178 -03 -04
Southern 24314 29392 24271 29342 -02 -02
Eastern 12012 12547 11931 12507 -07 -03
North Eastern 1487 1387 1451 1351 -24 -25
All India 101327 111455 100377 110753 -09 -06
Oct-2017 Oct-2018 Oct-2017 Oct-2018 Oct-2017 Oct-2018
Northern 51307 50659 50289 49635 -20 -20
Western 48530 56548 46392 55695 -44 -15
Southern 39142 45279 38905 45226 -06 -01
Eastern 19850 22959 19836 22567 -01 -17
North Eastern 2596 2790 2499 2700 -37 -32
All India 162027 172945 157394 170604 -29 -14
Oct-2018 Figures are Provisional
7
8 Power Supply Position (Energy amp Peak) in Oct-2018
Peak Demand Peak Met
Requirement Availability
Energy (MU)Region
Surplus(+)
Deficit (-) in
Surplus(+)
Deficit (-) in Region
Power (MW)
File NoCEA-CH-14-1142018-Coordination Division
Chandigarh Delhi Haryana HP JampK Punjab Rajasthan UP Utrakhand Oct-2017 0 0 0 0 516 0 0 0 0
Oct-2018 0 0 0 0 567 0 0 688 0
Chattisgarh Gujarat MP Maharastra Daman amp Diu Dadar Nagar Goa
Oct-2017 16 0 13 2062 0 0 25
Oct-2018 146 19 39 705 1 4 0
AP Telangana Karnataka Kerala Tamil Nadu Puducherry Lakshadweep
Oct-2017 18 19 0 211 38 2 0
Oct-2018 0 0 0 83 414 1 0
8
9 Peak Shortage of Power Supply (MW) in Different Regions in Oct-2018
0 0 0 0
567
0 0
688
00 0 0 0
516
0 0 0 0
0
400
800
Chan
dig
ar
h
Delh
i
Hary
ana
HP
Jamp
K
Pu
nj
ab
Raja
sth
an
UP
Utr
ak
hand
MW
Northern States (MW) Oct-2018 Oct-2017
146
19
39 705
1 4 016
0 13
2062
0 0 25
0
5000
Ch
attis
garh
Guja
rat
MP
Mah
ara
st
ra
Da
man amp
Diu
Da
dar
Na
gar G
oaM
W
Western States (MW) Oct-2018 Oct-2017
0 0 083
414
1 018 19 0
211
38 2 00
500
AP Telangana Karnataka Kerala Tamil Nadu Puducherry Lakshadweep
Southern State (MW) Oct-2018 Oct-2017
File NoCEA-CH-14-1142018-Coordination Division
Bihar DVC Jharkhand Odisha West Bengal Sikkim AampN Island
Oct-2017 6 0 0 0 8 0 4
Oct-2018 0 0 0 400 0 0 4
Arunachal Assam Manipur Meghalaya Mizoram Nagaland Tripura
Oct-2017 6 77 4 0 2 2 12
Oct-2018 13 81 2 0 2 3 0
9
0 0 0
400
0 0 46 0 0 0 8 0 4
0100200300400500
Bih
ar
DV
C
Jha
rkh
an
d
Od
ish
a
We
st
Be
ng
al
Sik
kim
Aamp
NIs
land
MW
Eastern States (MW) Oct-2018 Oct-2017
13
81
2 0 2 3 06 4 0 2 2
12
0
100
Aru
na
ch
al
Assa
m
Ma
nip
ur
Meghal
aya
Miz
ora
m
Na
gala
nd
Trip
ura
MW
North-Eastern States (MW)
File NoCEA-CH-14-1142018-Coordination Division
Sector Oct-2017 Oct-2018
Central 6872 7355
State 5217 6078
Private 6045 6819
ALL INDIA 5882 6524
Month PLF 2017 PLF 2018
Jan 6014 6288
Feb 6153 6285
March 6313 6558
April 6493 6458
May 6355 6554
June 5672 5917
July 537 5545
Aug 5733 5639
Sep 5989 6109
Oct 5882 6524
For Coal and Lignite based Power Plants and Provisional based on Actual-Cum-Assesment
10
PLF of Thermal Power Plants
All India PLF of Thermal Plants (Excluding Gas Based Plants) Month-wise
10 All India PLF Sector-wise for Oct-2018
68
72
52
17
60
45
58
8273
55
60
78
68
19
65
24
000
1000
2000
3000
4000
5000
6000
7000
8000
Central State Private ALL INDIA
P
LF
Oct-2017 Oct-2018
0
10
20
30
40
50
60
70
Jan Feb March April May June July Aug Sep Oct
Months
All India PLF Month-wise
PLF 2017 PLF 2018
File NoCEA-CH-14-1142018-Coordination Division
2012-13 2013-14 2014-15 2015-16 2016-17
TampD Losses 2304 2284 2277 2181 2142
ATampC Losses 2548 2258 2462
Note As per PFC for utilities selling directly to consumers
Total Number of Villages
597464
Note From the year 2004-05 onwards Definition of Village Electrification-
A village would be declared Electrified if
Without
Subsidy
Gap ACS-
ARR(
Without
Subsidy)
Paiseunit
Gap ACS-
ARR (on
subsidy
booked
basis)
paiseunit
Gap ACS-
ARR (on
subsidyrece
ived basis)
paiseunit
2013-14 400 118 76 77
2014-15 412 108 58 60
Source- PFC Reports on the performance of State Power Utilities
2013-14 4894
2014-15 5304
2015-16 5459
2016-17 5743
2017-18 6080
11
Average cost of supply(ACS)
(paiseunit)
i) Basic Infrastructure such as Distribution Transformer and Distribution lines are provided in the inhabited locality
as well as Dalit Basti hemlet where it exists (For electrification through Non-Conventional Energy Sources a
Distribution Transformer may not be necessary)
14 All India Coal consumption for Power Generation (MT)
520
Average Revenue Realization(paiseunit)
518
Year
ii) Electricity is provided to Public places like Schools Panchayat Office Health Centre Dispensaries Community
Centres etc and
iv) Mandatory Certification from Gram Panchayat regarding the completion of village electrification should be
obtained
13 Average cost of Power amp Average Realisation
iii) The number of households electrified should be at least 10 of the total number of households in the village
11 T amp D and ATampC Losses ()
12 All India Village Electrification
Villiages Electrified (Nos)
10000All villages as per census 2011 has
been electrified on 28042018
Villages electrified
File NoCEA-CH-14-1142018-Coordination Division
SN Contents Page
1 Capacity Addition Targets and Achievements in 12th Plan 12
2 Capacity Addition Targets amp Achievements during Oct-2018 and April 2018- Oct 2018 13
3 Installed Capacity in various Regions including their shares 14-19
Section B - Capacity Addition
File NoCEA-CH-14-1142018-Coordination Division
Figures in MW
TARGET ACH TARGET ACH TARGET ACH TARGET ACH
CENTRAL 14878 15869 6004 2584 5300 2000 26182 20453
STATE 13922 22201 1608 2276 0 0 15530 24477
PRIVATE 43540 53661 3285 619 0 0 46825 54280
ALL INDIA 72340 91730 10897 5479 5300 2000 88537 99209
Figures in MW
Thermal Hydro Nuclear Total
Target Ach Target Ach Target Ach Target Ach
Central 4880 3170 800 390 500 6180 3560 5761
State 3546 1760 300 200 0 3846 1960 5096
Private 2940 3780 205 205 0 3145 3985 12671
Total 11366 8710 1305 795 500 0 13171 9505 7217
12
2 CAPACITY ADDITION TARGET AND ACHIEVEMENT FOR 2017-18 (IN MW)
1 Capacity Addtion Targets and Achievements in the 12th Plan
SECTORTHERMAL HYDRO NUCLEAR TOTAL
File NoCEA-CH-14-1142018-Coordination Division
(MW)
Cummulative
Deviation
Target Achievement Target Achievement (+) (-)
Central 2760 250 0 250 0 -250
State 450615 1030 0 1030 69755 -960245
Private 0 0 600 0 600 600
Total 726615 1280 600 1280 669755 -610245
Central 710 0 0 110 110 0
State 130 0 0 12999 30 -9999
Private 0 0 0 0 0 0
Total 840 0 0 23999 140 -9999
Nuclear Central 0 0 0 0 0 0
Central 3470 250 0 360 110 -250
State 463615 1030 0 115999 99755 -1060235
Private 0 0 600 0 600 600
Total 810615 1280 600 151999 809755 -710235
Electricity Generation (MU) Targets and Achievements for 2016-17
13
2 Capacity Addition Targets Achievements During Oct-2018
Schemes Sector
Target 2018-19
April 2018- Oct 2018Oct-18
Hydro
All India
Capacity Addition TargetsAchievements during the Month of Oct-2018
Thermal
12
80
24
0
0
15
20
67
0
14
0
0
81
0
0
200
400
600
800
1000
1200
1400
1600
Thermal Hydro Nuclear Total
MW
Targets and Achievement during 2018-19Target Achievement
600
0 00 0
600
0
100
200
300
400
500
600
700
800
900
1000
Target Achievement
MW
Targets and Achievement during Oct 2018Thermal Hydro
Nuclear Total
File NoCEA-CH-14-1142018-Coordination Division
Coal Gas Diesel Total
State 1593400 287920 000 1881320 000 869755 68956 2820031
Private 2276083 55800 000 2331883 000 251400 1261535 3844818
Central 1258537 234406 000 1492943 162000 849622 32900 2537465
Sub Total 5128020 578126 000 5706146 162000 1970777 1363391 9202314
State 2128000 284982 000 2412982 000 544650 31119 2988751
Private 3488567 467600 000 3956167 000 48100 2005170 6009437
Central 1504295 328067 000 1832362 184000 162000 66130 2244492
Sub Total 7120862 1080649 000 8201511 184000 754750 2102418 11242679
State 1943250 79198 28788 2051236 000 1183803 52102 3287141
Private 1212450 532210 47370 1792030 000 000 3495815 5287845
Central 1422502 35958 000 1458460 332000 000 49190 1839650
Sub Total 4578202 647366 76158 5301726 332000 1183803 3597107 10414636
State 695000 10000 000 705000 000 353792 22511 1081303
Private 637500 000 000 637500 000 39900 84853 762253
Central 1387664 000 000 1387664 000 100520 1000 1489184
Sub Total 2720164 10000 000 2730164 000 494212 108364 3332740
State 000 49771 3600 53371 000 42200 25674 121245
Private 000 2450 000 2450 000 000 2571 5021
Central 52002 125360 000 177362 000 103000 500 280862
Sub Total 52002 177581 3600 233183 000 145200 28745 407128
State 000 000 4005 4005 000 000 525 4530
Private 000 000 000 000 000 000 221 221
Central 000 000 000 000 000 000 510 510
Sub Total 000 000 4005 4005 000 000 1256 5261
State 6359650 711871 36393 7107913 000 2994200 200887 10303000
Private 7614600 1058060 47370 8720030 000 339400 6850164 15909594
Central 5625000 723791 000 6348791 678000 1215142 150230 8392163
Total 19599250 2493722 83763 22176734 678000 4548742 7201281 34604757
Figures at decimal may not tally due to rounding off
Note -
(As per latest information available with MNRE)
Break up of RES all India as on 30092018 is given below (in MW)
450695 3461510 2402166 7201281
A Oct 2018 669755 MW
B Capacity Retired
during
Oct 2018 705 MW
C Oct 2018 0 MW
D Oct 2018 A-B+C -35245 MW
Share of Telangana from JEGURUPADU CCPP Ph II has been removed and the same has been added to private sector of Andhra Pradesh due to expiry of PPA as per
request from TS Transco
Region
ALL INDIA INSTALLED CAPACITY (IN MW) OF POWER STATIONS (As on 31102018)
(UTILITIES)
Net Capacity Added during
1 RES include SHP BP UampI Solar and Wind Energy Installed capacity in respect of RES (MNRE) as on 30092018
Small
Hydro PowerWind Power
Bio-PowerSolar Power
Total
CapacityBM PowerCogen Waste to Energy
2 U-1 to 7 (76995=69755 MW) of LAKWA REPLACEMENT POWER PROJECT commissioned in April 2018 but intimated in October 2018
has been added to state sector of Assam
1 Badarpur TPS (705 MW) has been retired from central sector of Northern Region
Capacity Up-rated
Ownership Sector
873080 13830
Capacity Added during
1 U-2 (600 MW) of MAHAN TPP has been commissioned and added to private sector of Madhya Pradesh
Grand TotalThermalNuclear Hydro
Islands
ALL INDIA
Abbreviation- SHP=Small Hydro Project (le 25 MW) BP=Biomass Power UampI=Urban amp Industrial Waste Power RES=Renewable Energy Sources
Northern Region
Western Region
Southern Region
Eastern Region
North Eastern
Region
RES
(MNRE)
Modewise breakup
File NoCEA-CH-14-1142018-Coordination Division
Coal Gas Diesel Total
State 13500 180040 000 193540 000 000 000 193540
Private 86922 10800 000 97722 000 000 12157 109879
Central 311272 20701 000 331973 10283 72309 000 414565
Sub-Total 411694 211541 000 623235 10283 72309 12157 717984
State 272000 15000 000 287000 000 110282 5930 403212
Private 408078 000 000 408078 000 20000 34745 462823
Central 129472 53561 000 183034 10094 66370181 500 259998
Sub-Total 809550 68561 000 878112 10094 196652 41175 1126032
State 000 000 000 000 000 69460 25661 95121
Private 000 000 000 000 000 99200 60536 159736
Central 18340 6201 000 24541 2895 122388 000 149824
Sub-Total 18340 6201 000 24541 2895 291048 86197 404681
State 000 17500 000 17500 000 123000 12903 153403
Private 000 000 000 000 000 000 5985 5985
Central 50639 12907 000 63547 6798 109188 000 179533
Sub-Total 50639 30407 000 81047 6798 232188 18888 338921
State 176000 15000 000 191000 000 259770 12780 463550
Private 511550 000 000 511550 000 28800 115462 655812
Central 85458 26401 000 111859 19681 92342 000 223882
Sub-Total 773008 41401 000 814409 19681 380912 128242 1343244
State 585000 60380 000 645380 000 109618 2385 757383
Private 388200 000 000 388200 000 10400 710680 1109280
Central 120625 22110 000 142735 55674 73901 29400 301710
Sub-Total 1093825 82490 000 1176315 55674 193919 742465 2168373
State 546900 000 000 546900 000 72410 2510 621820
Private 871433 000 000 871433 000 84200 266691 1222324
Central 379639 54949 000 434588 28948 180253 3000 646789
Sub-Total 1797972 54949 000 1852921 28948 336863 272201 2490933
State 000 000 000 000 000 125215 6787 132002
Private 9900 45000 000 54900 000 8800 52244 115944
Central 34324 6966 000 41290 3124 47554 000 91968
Sub-Total 44224 51966 000 96190 3124 181569 59031 339914
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 3035 3035
Central 3815 1503 000 5317 801 10171 000 16289
Sub-Total 3815 1503 000 5317 801 10171 3035 19324
124953 29105 000 154058 23703 75145 000 252907
State 1593400 287920 000 1881320 000 869755 68956 2820031
Private 2276083 55800 000 2331883 000 251400 1261535 3844818
Central 1258537 234406 000 1492943 162000 849622 32900 2537465
Grand Total 5128020 578126 000 5706146 162000 1970777 1363391 9202314
Uttar Pradesh
Uttarakhand
Chandigarh
Grand TotalThermalNuclear
Hydro
(Renewable)
RES
(MNRE)
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
NORTHERN REGION
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
(As on 31102018)
Central - Unallocated
Total (Northern
Region)
Delhi
Haryana
Himachal Pradesh
Jammu amp Kashmir
Punjab
Rajasthan
State Ownership Sector
Modewise breakup
File NoCEA-CH-14-1142018-Coordination Division
(As on 31102018)
Coal Gas Diesel Total
State 000 000 000 000 000 000 005 005
Private 000 4800 000 4800 000 000 091 4891
Central 45478 1967 000 47445 2600 000 000 50045
Sub-Total 45478 6767 000 52245 2600 000 096 54941
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 1301 1301
Central 12663 4334 000 16997 700 000 000 17697
Sub-Total 12663 4334 000 16997 700 000 1301 18998
State 475000 217782 000 692782 000 77200 800 770782
Private 776567 396000 000 1172567 000 000 729782 1902349
Central 309051 42400 000 351451 55900 000 23830 431181
Sub-Total 1560618 656182 000 2216800 55900 77200 754412 3104312
State 408000 000 000 408000 000 170366 8396 586762
Private 617400 10000 000 627400 000 000 378205 1005605
Central 279441 25700 000 305141 27300 152000 30000 514441
Sub-Total 1304841 35700 000 1340541 27300 322366 416601 2106808
State 228000 000 000 228000 000 12000 1105 241105
Private 849000 000 000 849000 000 000 52430 901430
Central 195344 000 000 195344 4800 10000 000 210144
Sub-Total 1272344 000 000 1272344 4800 22000 53535 1352679
State 1017000 67200 000 1084200 000 285084 20813 1390097
Private 1245600 56800 000 1302400 000 48100 842815 2193315
Central 433475 227273 000 660748 69000 000 12300 742048
Sub-Total 2696075 351273 000 3047348 69000 333184 875927 4325459
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 546 546
Central 17444 6634 000 24078 900 000 000 24978
Sub-Total 17444 6634 000 24078 900 000 546 25524
211400 19759 000 231159 22800 000 000 253959
State 2128000 284982 000 2412982 000 544650 31119 2988751
Private 3488567 467600 000 3956167 000 48100 2005170 6009437
Central 1504295 328067 000 1832362 184000 162000 66130 2244492
Grand Total 7120862 1080649 000 8201511 184000 754750 2102418 11242679
Central - Unallocated
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
WESTERN REGION
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
State Ownership Sector
Modewise breakup
Grand TotalThermalNuclear
Hydro
(Renewable)
RES
(MNRE)
Total (Western
Region)
Goa
Daman amp Diu
Gujarat
Madhya Pradesh
Chhattisgarh
Maharashtra
Dadra amp Nagar
Naveli
File NoCEA-CH-14-1142018-Coordination Division
(As on 31102018)
Coal Gas Diesel Total
State 501000 23540 000 524540 000 167360 4875 696775
Private 387388 381318 3680 772386 000 000 693073 1465459
Central 167456 000 000 167456 12727 000 25000 205183
Sub-Total 1055844 404858 3680 1464382 12727 167360 722948 2367417
State 508250 000 000 508250 000 247993 4022 760265
Private 83945 83182 000 167127 000 000 375048 542175
Central 195612 000 000 195612 14873 000 1000 211485
Sub-Total 787807 83182 000 870989 14873 247993 380070 1513925
State 502000 000 12792 514792 000 359980 15533 890305
Private 195850 000 2520 198370 000 000 1275640 1474010
Central 282920 000 000 282920 69800 000 000 352720
Sub-Total 980770 000 15312 996082 69800 359980 1291173 2717035
State 000 000 15996 15996 000 188150 15402 219548
Private 61500 17400 000 78900 000 000 20899 99799
Central 114322 35958 000 150280 36200 000 5000 191480
Sub-Total 175822 53358 15996 245176 36200 188150 41301 510827
State 432000 52408 000 484408 000 220320 12270 716998
Private 483767 50310 41170 575247 000 000 1130984 1706231
Central 448952 000 000 448952 144800 000 18190 611942
Sub-Total 1364719 102718 41170 1508607 144800 220320 1161444 3035171
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 000 000
Central 10000 000 000 10000 000 000 000 10000
Sub-Total 10000 000 000 10000 000 000 000 10000
State 000 3250 000 3250 000 000 000 3250
Private 000 000 000 000 000 000 171 171
Central 24840 000 000 24840 8600 000 000 33440
Sub-Total 24840 3250 000 28090 8600 000 171 36861
178400 000 000 178400 45000 000 000 223400
State 1943250 79198 28788 2051236 000 1183803 52102 3287141
Private 1212450 532210 47370 1792030 000 000 3495815 5287845
Central 1422502 35958 000 1458460 332000 000 49190 1839650
Grand Total 4578202 647366 76158 5301726 332000 1183803 3597107 10414636
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
SOUTHERN REGION
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
State Ownership Sector
Modewise breakup
Grand TotalThermal RES
(MNRE)Nuclear
Hydro
(Renewable)
Kerala
Tamil Nadu
NLC
Puducherry
Central - Unallocated
Total (Southern
Region)
Andhra Pradesh
Telangana
Karnataka
File NoCEA-CH-14-1142018-Coordination Division
(As on 31102018)
Coal Gas Diesel Total
State 71000 000 000 71000 000 000 7070 78070
Private 28100 000 000 28100 000 000 25545 53645
Central 291433 000 000 291433 000 11000 000 302432
Sub-Total 390533 000 000 390533 000 11000 32615 434147
State 42000 000 000 42000 000 13000 405 55405
Private 73000 000 000 73000 000 000 3207 76207
Central 39374 000 000 39374 000 6100 000 45474
Sub-Total 154374 000 000 154374 000 19100 3612 177086
State 540000 10000 000 550000 000 98600 9195 657795
Private 242500 000 000 242500 000 000 34452 276952
Central 76077 000 000 76077 000 41000 000 117077
Sub-Total 858577 10000 000 868577 000 139600 43647 1051824
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 000 000
Central 698504 000 000 698504 000 18620 000 717124
Sub-Total 698504 000 000 698504 000 18620 000 717124
State 42000 000 000 42000 000 206192 630 248822
Private 293900 000 000 293900 000 000 21648 315548
Central 163390 000 000 163390 000 8900 1000 173290
Sub-Total 499290 000 000 499290 000 215092 23278 737660
State 000 000 000 000 000 36000 5211 41211
Private 000 000 000 000 000 39900 001 39901
Central 8703 000 000 8703 000 6400 000 15103
Sub-Total 8703 000 000 8703 000 82300 5212 96215
110183 000 000 110183 000 8501 000 118684
State 695000 10000 000 705000 000 353792 22511 1081303
Private 637500 000 000 637500 000 39900 84853 762253
Central 1387664 000 000 1387664 000 100520 1000 1489184
Grand Total 2720164 10000 000 2730164 000 494212 108364 3332740
(As on 31102018)
Coal Gas Diesel Total
State 000 32821 000 32821 000 10000 3001 45822
Private 000 2450 000 2450 000 000 1680 4130
Central 27902 43556 000 71458 000 36851 000 108309
Sub-Total 27902 78827 000 106729 000 46851 4681 158261
State 000 000 000 000 000 000 10710 10710
Private 000 000 000 000 000 000 539 539
Central 2470 4682 000 7152 000 11800 000 18952
Sub-Total 2470 4682 000 7152 000 11800 11249 30201
State 000 000 000 000 000 32200 3103 35303
Private 000 000 000 000 000 000 006 006
Central 3040 10969 000 14009 000 7446 000 21455
Sub-Total 3040 10969 000 14009 000 39646 3109 56764
State 000 16950 000 16950 000 000 1601 18551
Private 000 000 000 000 000 000 009 009
Central 3740 43695 000 47435 000 7077 500 55012
Sub-Total 3740 60645 000 64385 000 7077 2110 73572
State 000 000 3600 3600 000 000 545 4145
Private 000 000 000 000 000 000 217 217
Central 3140 7157 000 10297 000 9677 000 19974
Sub-Total 3140 7157 3600 13897 000 9677 762 24336
State 000 000 000 000 000 000 3067 3067
Private 000 000 000 000 000 000 100 100
Central 2140 4893 000 7033 000 5860 000 12893
Sub-Total 2140 4893 000 7033 000 5860 3167 16060
State 000 000 000 000 000 000 3647 3647
Private 000 000 000 000 000 000 020 020
Central 2070 4046 000 6116 000 9913 000 16029
Sub-Total 2070 4046 000 6116 000 9913 3667 19696
7500 6362 000 13862 000 14376 000 28238
State 000 49771 3600 53371 000 42200 25674 121245
Private 000 2450 000 2450 000 000 2571 5021
Central 52002 125360 000 177362 000 103000 500 280862
Grand Total 52002 177581 3600 233183 000 145200 28745 407128
Central - Unallocated
Total (Eastern
Region)
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
NORTH-EASTERN REGION
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
State Ownership Sector
Modewise breakup
Grand TotalThermalNuclear
Bihar
Jharkhand
West Bengal
DVC
Odisha
Sikkim
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
EASTERN REGION
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
Ownership Sector
Modewise breakup
Grand TotalThermalNuclear
Hydro
(Renewable)
RES
(MNRE)
Manipur
Nagaland
State
Mizoram
Central - Unallocated
Total (North-
Eastern Region)
Hydro
(Renewable)
RES
(MNRE)
Assam
Arunachal Pradesh
Meghalaya
Tripura
File NoCEA-CH-14-1142018-Coordination Division
(As on 31102018)
Coal Gas Diesel Total
State 000 000 4005 4005 000 000 525 4530
Private 000 000 000 000 000 000 146 146
Central 000 000 000 000 000 000 510 510
Sub-Total 000 000 4005 4005 000 000 1181 5186
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 075 075
Central 000 000 000 000 000 000 000 000
Sub-Total 000 000 000 000 000 000 075 075
State 000 000 4005 4005 000 000 525 4530
Private 000 000 000 000 000 000 221 221
Central 000 000 000 000 000 000 510 510
Grand Total 000 000 4005 4005 000 000 1256 5261
19
Andaman amp
Nicobar
lakshadweep
Total (Islands)
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
State Ownership Sector
Modewise breakup
Grand TotalThermalNuclear
Hydro
(Renewable)
RES
(MNRE)
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
ISLANDS
File NoCEA-CH-14-1142018-Coordination Division
SrNo Contents Page
1 Executive summary of Target and Achievement of Transmission Lines during 2018-19
20(1)
2 List of Transmission Lines CommissionedReady for commissioning during Oct-2018 20(2)
Section C - Transmission Lines
File NoCEA-CH-14-1142018-Coordination Division
Executive summary of Target and Achievement of Transmission Lines during 2018-19 As on Oct-18
(All figures in circuit kms)
Centr
al S
ecto
r
Sta
te S
ecto
r
JV
Private
Secto
r
To
tal
Centr
al S
ecto
r
Sta
te S
ecto
r
JV
Private
Secto
r
To
tal
Centr
al S
ecto
r
Sta
te S
ecto
r
JV
Private
Secto
r
To
tal
Centr
al S
ecto
r
Sta
te S
ecto
r
JV
Private
Secto
r
To
tal
Centr
al S
ecto
r
Sta
te S
ecto
r
JV
Private
Secto
r
To
tal
Cen
tral S
ecto
r
Sta
te S
ecto
r
JV
Pri
vate
Secto
r
Gra
nd
To
tal
0 0 0 0 0 0 0 0 4692 766 827 6285 3045 5906 980 9931 553 5878 0 6431 8290 12550 1807 22647
Oct18 Programme 0 0 0 0 0 0 0 0 300 0 0 300 662 90 562 1314 0 723 0 723 962 813 562 2337
Achievement 0 0 0 0 0 0 0 0 729 0 0 729 471 266 0 737 0 401 0 401 1200 667 0 1867
Upto Oct-18 Programme 0 0 0 0 0 0 0 0 3004 416 0 3420 1350 3109 562 5021 481 4346 0 4827 4835 7871 562 13268
Achievement 0 0 0 0 0 0 0 0 2286 0 178 2464 1436 1783 1595 4814 60 4461 0 4521 3782 6244 1773 11799
20(1)
220 kV Grand Total 800 kV 500 kV
Programme 2018-19
Programme
Achievement
HVDC765 kV 400 kV
File NoCEA-CH-14-1142018-Coordination Division
SlNo Line
Length
(cKM)
1 2 3 4 5 6
1 765 Jharsuguda - Dharamjaygarh line DC PGCIL 296
2 765LILO of Kurnool - Thirvualam line at
CuddapahDC PGCIL 190
3 765 Salem PS - Madhugiri PS line SC PGCIL 243
4 400 Cuddapah - Hindupur line (Q) DC PGCIL 338
5 400LILO of Both Ckt of Bamnauli - Samaypur at
TughlakabadMC PGCIL 114
6 400LILO-Out of Cuddapah - Hindupur line (Q)
(Both Ckts) at NP Kunta ssDC PGCIL 19
1200
7 400LILO of Sterlite - Meramundali at Lapanga
4oo kV ssDC OPTCL 14
8 400 Sterlite - Lapanga line DC OPTCL 37
9 400 TMDC Podili - Sattapenalli line DC APTRANSCO 215
10 230Neyveli 230110 kV ss - Eachangadu
230kV FeederSC TANTRANSCO 1
11 230 NNTPS - Neyveli 230110kV ss DC TANTRANSCO 2
12 220 Ajmer (400 kV) - Bherunda (TK) DC RVPNL 100
13 220 Aligarh - Atrauli line DC UPPTCL 77
14 220 Khandwa - Chhanera line DC MPPTCL 78
15 220LILO of one Ckt of Hadala - Sartanpar line
at Wankaner on MC towersDC GETCO 6
16 220 LILO of one Ckt of Vita - Miraj at Alkud ss DC MSETCL 27
17 220 Mendhigiri - Alkud ss DC MSETCL 110
667
1867
20(2)
Grand Total
2Transmission Lines (220 kV and above) CommissionedReady for commissioning During Oct-2018
As on 31-10-18
Voltage
Level (kV)Name of Transmission Lines
Circuit
Type
Executing
Agency
CENTRAL SECTOR
Total of CENTRAL SECTOR
STATE SECTOR Sector
Total of STATE SECTOR
File NoCEA-CH-14-1142018-Coordination Division
SN Contents Page
1 Executive summary of Target and Achievement of Substations during 2018-19 21(1)
2Sub Stations (220 kV and above) commissionedready for commisssioning during Oct-
201821(2)
Section D - Sub Stations
File NoCEA-CH-14-1142018-Coordination Division
1 Executive summary of Target and Achievement of Substations during 2018-19 As on Oct-18
(All figures in circuit MVA)
Centr
al S
ecto
r
Sta
te S
ecto
r
JV
Private
Secto
r
To
tal
Centr
al S
ecto
r
Sta
te S
ecto
r
JV
Private
Secto
r
To
tal
Centr
al S
ecto
r
Sta
te S
ecto
r
JV
Private
Secto
r
To
tal
Centr
al S
ecto
r
Sta
te S
ecto
r
JV
Private
Secto
r
To
tal
Centr
al S
ecto
r
Sta
te S
ecto
r
JV
Private
Secto
r
To
tal
Cen
tral S
ecto
r
Sta
te S
ecto
r
JV
Pri
vate
Secto
r
Gra
nd
To
tal
3000 0 0 3000 0 0 0 0 22200 0 0 22200 8185 13085 630 21900 740 14760 0 15500 34125 27845 630 62600
Oct18 Programme 0 0 0 0 0 0 0 0 0 0 0 0 1000 1260 630 2890 0 1400 0 1400 1000 2660 630 4290
Achievement 0 0 0 0 0 0 0 0 3000 0 0 3000 1500 3120 0 4620 0 2220 0 2220 4500 5340 0 9840
Upto Oct-18 Programme 0 0 0 0 0 0 0 0 10000 0 0 10000 6130 7435 630 14195 0 9670 0 9670 16130 17105 630 33865
Achievement 0 0 0 0 0 0 0 0 14000 0 0 14000 9000 7550 630 17180 0 10610 0 10610 23000 18160 630 41790
21(1)
220 kV Grand Total 800 kV 500 kV
Programme 2018-19
Programme
Achievement
HVDC765 kV 400 kV
File NoCEA-CH-14-1142018-Coordination Division
As on 31-10-18
Sl Voltage Ratio Capacity
No (kVkV) (MWMVA)
1 2 3 4 5
1 Cuddapah Ss 765400 PGCIL 3000
2 Tughlakabad SS (GIS) 400220 PGCIL 1500
Total of CENTRAL SECTOR 4500
3 Panki Kanpur (Aug) TF-I 400200 UPPTCL 75
4 Hindupur ss (1st ICT) 400220 APTRANSCO 315
5 Thappagundu ss 400110 TANTRANSCO 600
6 Mendhasal (2nd power TF) 400220 OPTCL 20
7 Jodhpur ss (New) 400220 RVPNL 315
8 Shankarpally 400220 TSTRANSCO 500
9 Podili ss (1st ICT) 400220 APTRANSCO 315
10 Doni (Gadag)SS 400220 KPTCL 1000
11 Porur (Addl TF) 230110 TANTRANSCO 100
12 Anuppankulam (Addl TF) 230110 TANTRANSCO 60
13 Neyveli SS 230110 TANTRANSCO 480
14 Savarkundla (Aug) 22066 GETCO 60
15 Bhuna (Aug) 220132 HVPNL 100
16 Madanpur (Aug) 22066 HVPNL 100
17 Gurgaon Sec-52A (Aug) 22066 HVPNL 160
18 IA Hisar (Aug) 220132 HVPNL 50
19 Narwana (Aug) 220132 HVPNL 60
20 Therubali (3rd Auto TF) 220132 OPTCL 160
21 Halasar ss 220132 RVPNL 160
22 Bansi Siddaharthnagar (Aug) TF-I 220132 UPPTCL 60
23 Hata Kushinagar (New) TF-I 220132 UPPTCL 100
24 Gomti nagar Lucknow (Aug) TF-IV 22033 UPPTCL 60
25 Kanpur Road Lucknow (New) TF-III 22033 UPPTCL 60
26 Asoj (Aug) 22066 GETCO 150
27 Kangasiyali (Aug) 22066 GETCO 60
28 Karmsad (Aug) 22066 GETCO 160
29 Lalpar (Aug) 22066 GETCO 60
TOTAL STATE SECTOR 5340
GRAND TOTAL 9840
21(2)
PRIVATE SECTOR
CENTRAL SECTOR
STATE SECTOR
2Sub-Stations (220 kV and above) CommissionedReady for commissioning During Oct-2018
Name of Sub StationsExecuting
Agency
File NoCEA-CH-14-1142018-Coordination Division
SN Contents Page
1 Electricity Generation (MU) Targets and Achievements for 2018-19 22
Section E - Electricity Generation
File NoCEA-CH-14-1142018-Coordination Division
Programme Achievement Ach Programme Achievement Ach
Central Sector 35160700 3028100 3162321 10443 20144400 21150469 10499
State Sector 35132000 3010000 3017260 10024 19922100 19549030 9813
PvtIPP Sector 36999700 3240600 3375603 10417 21598300 20794155 9628
PvtUTL Sector 1857600 164500 180597 10979 1130900 1203107 10638
Total 109150000 9443200 9735781 10310 62795700 62696761 9984
Central Sector 5617600 420900 451004 10715 4193000 4045436 9648
State Sector 6110600 559500 708469 12663 4049400 4433000 10947
PvtIPP Sector 1141800 80500 90122 11195 976400 1021963 10467
PvtUTL Sector 130000 11300 12564 11119 76700 99943 13030
Total 13000000 1072200 1262159 11772 9295500 9600342 10328
Central Sector 3850000 353300 303310 8585 2068900 2203540 10651
Total 3850000 353300 303310 8585 2068900 2203540 10651
Bhutan Import 500000 63300 35395 5592 347000 416660 12007
Central Sector 44628300 3802300 3916635 10301 26406300 27399445 10376
State Sector 41242600 3569500 3725729 10438 23971500 23982030 10004
Pvt Sector 40129100 3496900 3658886 10463 23782300 23119168 9721
Total 126500000 10932000 11336645 10370 74507100 74917303 10055
Provisional based on actual-cum-Assesment
Figs in MU
Cummulative
Achievement
Cummulative
Achievement
Sep-18 Sep-17 Upto Sep-2018 Upto Sep-2017
1073794 748889 7332680 5660929
22
Renewable Energy Generation
Achievement
Oct-2018
1 Electricity Generation (MU) Targets and Achievememts for 2018-19
All India Energy Generation During April 2018- Oct 2018 (MU)
Target (2018-19)April 2018- Oct 2018
Sector
Hydro
Thermal
Nuclear
627957
92955
20689
745071
626968
96003
22035
749173
0
100000
200000
300000
400000
500000
600000
700000
800000
Thermal Hydro Nuclear Total
Programme
Achievement
File NoCEA-CH-14-1142018-Coordination Division
SN Contents Page
1 Energy Power Supply Position (Provisional) for Oct-2018 and during April 2018- Oct 2018 23
2 Peak Power Supply Position (Provisional) for Oct-2018 and during April 2018- Oct 2018 24
3 Energy Power Supply Position (Revised) for Sep-2018 and during April 2018- Sept 2018 25
4 Peak Power Supply Position (Revised) for Sep-2018 and during April 2018- Sept 2018 26
5 Notified Power cuts Restrictions on Industries during Oct-2018 27
6 Power Supply to Agricultural Sector during Oct-2018 28
Section F - Power supply position
File NoCEA-CH-14-1142018-Coordination Division
आकड़ मममलयन यननट नट Figures in MU net
ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied
कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )
चडीगढ़ Chandigarh 108 108 0 00 1055 1055 0 00
दिलली Delhi 2490 2489 1 00 22524 22510 14 01
हरियजणज Haryana 4554 4554 0 00 35205 35205 0 00
दहमजचल परिश Himachal Pradesh 788 787 2 02 5728 5560 168 29
रमम कशमीि Jammu amp Kashmir 1497 1219 278 186 10982 8865 2117 193
परजब Punjab 4418 4418 0 00 38832 38819 13 00
िजरसथजन Rajasthan 6748 6748 0 00 45341 45181 160 04
उतति परिश Uttar Pradesh 10136 9973 164 16 75485 74808 676 09
उततिजखड Uttarakhand 1083 1081 3 03 8395 8310 85 10
उततरी कषतर Northern Region 31822 31375 447 14 243547 240314 3233 13
छततीसगढ़ Chhattisgarh 2454 2453 1 00 16119 16091 28 02
गरिजत Gujarat 11636 11636 0 00 70782 70768 14 00
मधय परिश Madhya Pradesh 5860 5859 1 00 38412 38410 2 00
महजिजषटर Maharashtra 15223 15095 128 08 95489 95355 134 01
िमन औि दिउ Daman amp Diu 216 216 0 00 1523 1523 0 00
िजिि व नगि हवली Dadra amp Nagar Haveli 553 553 0 00 3757 3757 0 00
गोवज Goa 366 366 0 00 2497 2495 2 01
पशचिमी कषतर Western Region 36308 36178 130 04 228579 228398 180 01
आनधर परिश Andhra Pradesh 5860 5854 6 01 37377 37334 43 01
तलगजनज Telangana 6748 6742 6 01 38251 38205 46 01
कनजाटक Karnataka 5842 5835 7 01 39111 39059 52 01
किल Kerala 2116 2096 20 09 14256 14160 96 07
तममल नजड Tamil Nadu 8611 8601 10 01 65742 65666 76 01
पडचिी Puducherry 216 215 1 05 1654 1646 8 05
लकष-दवीप Lakshadweep 4 4 0 0 27 27 0 0
दकषकषणी कषतर Southern Region 29392 29342 50 02 196390 196069 321 02
बबहजि Bihar 2742 2738 4 01 19143 18951 192 10
िजमोिि घजटी ननगम DVC 1712 1698 13 08 13096 12828 268 20
झजिखणड Jharkhand 701 697 4 06 5022 4949 73 15
ओडडशज Odisha 3147 3134 13 04 20224 20192 32 02
पशशचम बगजल West Bengal 4204 4200 4 01 33008 32881 127 04
मसशककम Sikkim 40 40 0 00 279 279 0 01
अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 67 202 188 13 67
परवी कषतर Eastern Region 12547 12507 40 03 90772 90080 692 08
अरणजचल परिश Arunachal Pradesh 67 66 1 09 502 496 7 13
असम Assam 833 809 24 29 6153 5903 250 41
मणणपि Manipur 72 71 1 10 485 478 7 14
मघजलय Meghalaya 147 147 0 00 1043 1042 0 00
ममज़ोिम Mizoram 63 62 1 08 365 359 5 14
नजगजलड Nagaland 76 67 8 110 540 481 59 109
बिपिज Tripura 130 129 1 09 1025 1007 19 18
उततर-परवी कषतर North-Eastern Region 1387 1351 35 25 10113 9766 346 34
समपणण भारत All India 111455 110753 702 06 769399 764627 4773 06
23
ऊराण वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Energy Power Supply Position Report (Provisional)
राजयStateअकरबर2018 October2018 अपरल2018 -अकरबर2018 April2018 to October2018
ऊरजा पनत ा म कमी ऊरजा पनत ा म कमीEnergy not Supplied
Excludes energy exported to Bangladesh
Energy not Supplied
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
File NoCEA-CH-14-1142018-Coordination Division
अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met
कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )
चडीगढ़ Chandigarh 217 217 0 00 369 369 0 00
दिलली Delhi 4713 4713 0 00 7016 7016 0 00
हरियजणज Haryana 7948 7948 0 00 10270 10270 0 00
दहमजचल परिश Himachal Pradesh 1520 1520 0 00 1520 1520 0 00
रमम कशमीि Jammu amp Kashmir 2836 2269 567 200 2951 2361 590 200
परजब Punjab 7979 7979 0 00 12638 12638 0 00
िजरसथजन Rajasthan 11450 11450 0 00 11698 11698 0 00
उतति परिश Uttar Pradesh 17434 16745 688 39 20498 20062 436 21
उततिजखड Uttarakhand 1943 1943 0 00 2143 2143 0 00
उततरी कषतर Northern Region 50659 49635 1024 20 63166 61726 1440 23
छततीसगढ़ Chhattisgarh 4414 4268 146 33 4414 4268 146 33
गरिजत Gujarat 18148 18130 19 01 18148 18130 19 01
मधय परिश Madhya Pradesh 11356 11317 39 03 11356 11317 39 03
महजिजषटर Maharashtra 23864 23159 705 30 23864 23254 610 26
िमन औि दिउ Daman amp Diu 342 341 1 02 357 356 1 02
िजिि व नगि हवली Dadra amp Nagar Haveli 784 780 4 05 816 815 1 01
गोवज Goa 536 536 0 00 596 596 0 00
पशचिमी कषतर Western Region 56548 55695 853 15 56548 55695 853 15
आनधर परिश Andhra Pradesh 9435 9435 0 00 9435 9435 0 00
तलगजनज Telangana 10603 10603 0 00 10815 10815 0 00
कनजाटक Karnataka 10741 10741 0 00 10741 10741 0 00
किल Kerala 3727 3644 83 22 4050 3997 53 13
तममल नजड Tamil Nadu 14747 14333 414 28 15029 14981 47 03
पडचिी Puducherry 363 362 1 03 420 400 19 46
लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0
दकषकषणी कषतर Southern Region 45279 45226 53 01 45946 45684 262 06
बबहजि Bihar 4945 4945 0 00 5050 5045 5 01
िजमोिि घजटी ननगम DVC 2729 2729 0 00 2874 2874 0 00
झजिखणड Jharkhand 1260 1260 0 00 1339 1284 55 41
ओडडशज Odisha 5624 5224 400 71 5624 5357 268 48
पशशचम बगजल West Bengal 8775 8775 0 00 9130 9123 7 01
मसशककम Sikkim 86 86 0 00 90 90 0 00
अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7
परवी कषतर Eastern Region 22959 22567 392 17 22959 22567 392 17
अरणजचल परिश Arunachal Pradesh 138 125 13 94 138 133 5 37
असम Assam 1785 1704 81 45 1865 1809 56 30
मणणपि Manipur 187 185 2 11 193 186 7 36
मघजलय Meghalaya 336 336 0 00 371 368 2 07
ममज़ोिम Mizoram 99 97 2 20 103 98 4 41
नजगजलड Nagaland 134 131 3 22 156 138 18 117
बिपिज Tripura 269 269 0 00 298 293 5 17
उततर-परवी कषतर North-Eastern Region 2790 2700 90 32 2967 2850 117 39
समपणण भारत All India 172945 170604 2341 14 177022 175528 1494 08
24
अधिकतम वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Peak Power Supply Position Report (Provisional)
आकड़ मगज वजट नट Figures in MW netअपरल2018 -अकरबर2018 April2018 to October2018
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
मजग की पनता म कमी Demand not Met
Excludes the supply to Bangladesh
राजयStateअकरबर2018 October2018
मजग की पनता म कमी Demand not Met
File NoCEA-CH-14-1142018-Coordination Division
आकड़ मममलयन यननट नट Figures in MU net
ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied
कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )
चडीगढ़ Chandigarh 141 141 0 00 947 947 0 00
दिलली Delhi 2925 2924 1 00 20034 20021 13 01
हरियजणज Haryana 4794 4794 0 00 30651 30651 0 00
दहमजचल परिश Himachal Pradesh 876 853 24 27 4940 4773 167 34
रमम कशमीि Jammu amp Kashmir 1520 1246 274 180 9485 7646 1839 194
परजब Punjab 5575 5575 0 00 34414 34401 13 00
िजरसथजन Rajasthan 6202 6201 0 00 38594 38434 160 04
उतति परिश Uttar Pradesh 10211 10124 86 08 65349 64836 513 08
उततिजखड Uttarakhand 1162 1149 13 11 7311 7229 82 11
उततरी कषतर Northern Region 33405 33008 398 12 211725 208939 2786 13
छततीसगढ़ Chhattisgarh 2403 2388 15 06 13665 13638 27 02
गरिजत Gujarat 10122 10122 0 00 59146 59132 14 00
मधय परिश Madhya Pradesh 5492 5491 1 00 32552 32551 1 00
महजिजषटर Maharashtra 13615 13612 3 00 80266 80260 6 00
िमन औि दिउ Daman amp Diu 221 221 0 00 1306 1306 0 00
िजिि व नगि हवली Dadra amp Nagar Haveli 551 551 0 00 3204 3204 0 00
गोवज Goa 339 339 0 00 2131 2128 2 01
पशचिमी कषतर Western Region 32742 32723 19 01 192270 192220 50 00
आनधर परिश Andhra Pradesh 5294 5287 7 01 31518 31480 37 01
तलगजनज Telangana 6279 6272 8 01 31503 31463 40 01
कनजाटक Karnataka 5701 5693 8 01 33269 33225 45 01
किल Kerala 2050 2026 24 12 12140 12063 76 06
तममल नजड Tamil Nadu 8971 8959 12 01 57131 57065 66 01
पडचिी Puducherry 226 224 2 08 1438 1431 7 05
लकष-दवीप Lakshadweep 4 4 0 0 23 23 0 0
दकषकषणी कषतर Southern Region 28520 28460 60 02 166998 166727 271 02
बबहजि Bihar 2839 2793 46 16 16400 16213 188 11
िजमोिि घजटी ननगम DVC 1901 1750 151 79 11384 11130 254 22
झजिखणड Jharkhand 740 723 17 22 4321 4252 69 16
ओडडशज Odisha 2921 2918 3 01 17077 17058 19 01
पशशचम बगजल West Bengal 4902 4879 23 05 28804 28681 123 04
मसशककम Sikkim 39 39 0 01 239 239 0 01
अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 67 173 162 12 67
परवी कषतर Eastern Region 13341 13102 240 18 78225 77573 652 08
अरणजचल परिश Arunachal Pradesh 74 73 1 10 435 429 6 14
असम Assam 950 914 36 38 5320 5094 226 43
मणणपि Manipur 70 69 1 11 414 408 6 15
मघजलय Meghalaya 150 150 0 01 896 896 0 01
ममज़ोिम Mizoram 58 57 1 12 302 297 5 16
नजगजलड Nagaland 80 72 8 104 464 414 50 108
बिपिज Tripura 192 191 1 07 895 878 17 19
उततर-परवी कषतर North-Eastern Region 1575 1527 48 31 8726 8415 311 36
समपणण भारत All India 109584 108819 765 07 657944 653873 4071 06
Energy not Supplied Energy not Supplied
ससतबर2018 September2018 अपरल2018 -ससतबर2018 April2018 to September2018
ऊरजा पनत ा म कमी ऊरजा पनत ा म कमी
Excludes energy exported to Bangladesh
राजयState
ऊराण वरवदयत आपरतण शथिरत ररपोरण (सशोधित) Energy Power Supply Position Report (Revised)
25
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
File NoCEA-CH-14-1142018-Coordination Division
अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met
कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )
चडीगढ़ Chandigarh 293 293 0 00 369 369 0 00
दिलली Delhi 5358 5358 0 00 7016 7016 0 00
हरियजणज Haryana 9008 9008 0 00 10270 10270 0 00
दहमजचल परिश Himachal Pradesh 1466 1466 0 00 1479 1479 0 00
रमम कशमीि Jammu amp Kashmir 2951 2361 590 200 2951 2361 590 200
परजब Punjab 11405 11405 0 00 12638 12638 0 00
िजरसथजन Rajasthan 10612 10612 0 00 11698 11698 0 00
उतति परिश Uttar Pradesh 18346 18121 225 12 20498 20062 436 21
उततिजखड Uttarakhand 1996 1996 0 00 2143 2143 0 00
उततरी कषतर Northern Region 56407 55649 758 13 63166 61726 1440 23
छततीसगढ़ Chhattisgarh 4404 4075 328 75 4404 4136 268 61
गरिजत Gujarat 16963 16963 0 00 17053 16963 90 05
मधय परिश Madhya Pradesh 8811 8771 41 05 8811 8775 36 04
महजिजषटर Maharashtra 22455 22349 106 05 23395 23254 141 06
िमन औि दिउ Daman amp Diu 357 356 1 02 357 356 1 02
िजिि व नगि हवली Dadra amp Nagar Haveli 816 815 1 01 816 815 1 01
गोवज Goa 596 596 0 00 596 596 0 00
पशचिमी कषतर Western Region 52933 52895 38 01 53841 52895 945 18
आनधर परिश Andhra Pradesh 9435 9416 19 02 9435 9416 19 02
तलगजनज Telangana 10815 10815 0 00 10815 10815 0 00
कनजाटक Karnataka 10103 10090 13 01 10690 10688 2 00
किल Kerala 3888 3638 251 64 4050 3997 53 13
तममल नजड Tamil Nadu 14556 14553 3 00 15029 14981 47 03
पडचिी Puducherry 390 372 17 45 420 400 19 46
लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0
दकषकषणी कषतर Southern Region 45542 45428 114 02 45946 45684 262 06
बबहजि Bihar 5050 5045 5 01 5050 5045 5 01
िजमोिि घजटी ननगम DVC 2641 2641 0 00 2874 2874 0 00
झजिखणड Jharkhand 1233 1233 0 00 1339 1284 55 41
ओडडशज Odisha 4906 4906 0 00 5357 5357 0 00
पशशचम बगजल West Bengal 8644 8639 5 01 9130 9123 7 01
मसशककम Sikkim 78 78 0 00 90 90 0 00
अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7
परवी कषतर Eastern Region 22110 22100 10 00 22470 22290 180 08
अरणजचल परिश Arunachal Pradesh 132 130 2 15 138 133 5 37
असम Assam 1865 1809 56 30 1865 1809 56 30
मणणपि Manipur 184 182 2 13 193 186 7 36
मघजलय Meghalaya 317 317 0 00 371 368 2 07
ममज़ोिम Mizoram 95 93 2 23 103 98 4 41
नजगजलड Nagaland 142 138 5 32 156 138 18 117
बिपिज Tripura 296 293 3 10 298 293 5 17
उततर-परवी कषतर North-Eastern Region 2921 2850 71 24 2967 2850 117 39
समपणण भारत All India 177022 175528 1494 08 177022 175528 1494 08
26
मजग की पनता म कमी मजग की पनता म कमी Demand not MetDemand not Met
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
Excludes the supply to Bangladesh
अधिकतम वरवदयत आपरतण शथिरत ररपोरण (सशोधित) Peak Power Supply Position Report (Revised)
आकड़ मगज वजट नट Figures in MW net
राजयStateससतबर2018 September2018 अपरल2018 -ससतबर2018 April2018 to September2018
File NoCEA-CH-14-1142018-Coordination Division
अकरबर2018 October2018अपरल2018 -अकरबर2018 April2018 to October2018
उततरी कषतर Northern Region
चडीगढ़ Chandigarh Data not received Data not received
दिलली Delhi
हरियजणज Haryana
दहमजचल परिश Himachal Pradesh
रमम कशमीि Jammu amp Kashmir Data not received Data not received
परजब Punjab
िजरसथजन Rajasthanउतति परिश Uttar Pradesh
उततिजखड Uttarakhand
पशचिमी कषतर Western Region
छततीसगढ़ Chhattisgarh
गरिजत Gujarat
मधय परिश Madhya Pradesh
महजिजषटर Maharashtra
गोवज Goa
दकषकषणी कषतर Southern Region
आनधर परिश Andhra Pradesh
तलगजनज Telangana
कनजाटक Karnataka
किल Kerala
तममल नजड Tamil Nadu
पडचिी Puducherryपरवी कषतर Eastern Region
बबहजि Bihar
झजिखणड Jharkhand
ओडडशज Odisha
पशशचम बगजल West Bengal
N
o No
tified
Cuts
N
o No
tified
Cuts
27
अकरबर 2018 म इडथरीर पर वरवदयत करौती का वरवरवरण Notified Power CutsRestrictions on Industries during October2018
राजय कषतर State Regionऊराणमाग करौती EnergyDemand Cut
No Notified Cuts No Notified Cuts
File NoCEA-CH-14-1142018-Coordination Division
अकरबर2018 October2018अपरल2018 -अकरबर2018 April2018 to October2018
उततरी कषतर Northern Region
चडीगढ़ Chandigarh Data not received Data not received
दिलली Delhi Data not received Data not received
हरियजणज Haryana 940 hrsday 0709 - 0950 hrsday
दहमजचल परिश Himachal Pradesh No cut imposed on agriculture consumers and uninterrupted
power is being supplied to agriculture sector
HPSEBL has only 2 agriculture consumers and uninterrupted
power is being supplied to agriculture sector
रमम कशमीि Jammu amp Kashmir Data not received Data not received
परजब Punjab 0507 hrsday 0349 - 0844 hrsday
िजरसथजन Rajasthan 0630 hrsday 0630 hrsday
उतति परिश Uttar Pradesh 1825 hrsday 1814 - 1858 hrsday
उततिजखड Uttarakhand 2350 hrsday 2128 - 2357 hrsday
पशचिमी कषतर Western Region
छततीसगढ़ Chhattisgarh 18hoursday 18 hrsday
गरिजत Gujarat 805 hrsday 805 hrsday
मधय परिश Madhya Pradesh Three-Phase Supply(Irrigation)-947 hrs day
Three-Phase (Mixed) Supply - 2311 hrs day
Three-Phase Supply(Irrigation)- 0933 - 0947 hrs day Three-
Phase (Mixed) Supply - 2300 - 2320 hrs day
महजिजषटर Maharashtra Three-Phase Supply(Irrigation)- 9 hrs day
Three-Phase (Mixed) Supply - 24 hrs day
Three-Phase Supply(Irrigation)- 9 hrs day
Three-Phase (Mixed) Supply - 24 hrs day
गोवज Goa No restriction No restriction
दकषकषणी कषतर Southern Region
आनधर परिश Andhra Pradesh 07 hrsday 07 hrsday
तलगजनज Telangana 24 hoursday 24 hoursday
कनजाटक Karnataka 6 hrsday 6 hrsday
किल Kerala No Restrictions No Restrictions
तममल नजड Tamil Nadu 9 hrsday (6 hrs during day time and 3 hrs during night time) 9 hrsday (6 hrs during day time and 3 hrs during night time)
पडचिी Puducherry No Restrictions No Restrictions
परवी कषतर Eastern Region
बबहजि Bihar About 18 hrsday About 18 hrsday
झजिखणड Jharkhand About 20 hrsday About 20 hrsday
ओडडशज Odisha 24 hrsday 24 hrsday
पशशचम बगजल West Bengal About 23 hrsday About 23 hrsday
28
अकटबर 2018 कषि कषतर को षिदयत आपरति का षििरण Power Supply to Agricultural Sector during October2018
राजय कषतर State Regionऔसत वरवदयत आपरतण घनरो म Average Hours of Supply
On segregated feeders
File NoCEA-CH-14-1142018-Coordination Division
SNo Contents Page
1 Growth of Installed Capacity since 6th Plan 29
2 Progress of Transmission Sector since 6th Plan 30
3 All India Yearly Coal consumption for Power Generation (Utilities)
4 All India Annual Per Capita Consumption of Electricity since -2006
5 Average cost of power supply amp Average realisation (Paisakwh)
6 Growth of Rural Electrification amp Pump Sets Energisation
7 Status of Hydro Schemes Cleared by the CEA in Oct-2018
Section G - Growth of Power Sector
31
32
File NoCEA-CH-14-1142018-Coordination Division
(In MW)
Coal Gas Diesel Total
End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472
End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634
End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537
End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596
End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921
End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703
End of 12th Plan 19216288 2532938 83763 21832988 6780 4447842 50018 31960630
Up to Oct-2018 19599250 2493722 837629 22176734 6780 4548742 7201281 34604757
Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-17) = 51529 MW
Electricity Generation (MU) Targets and Achievements for 2016-17
Coal Gas Diesel Nuclear Hydro Res Total
1959925 2493722 837629 678000 454874 72012805 22925174
29
1 Growth of Installed Capacity Since 6th Plan
Plan YearThermal
Nuclear Hydro RES (MNRE) Total
Total Installed Capacity 34604757 MW
Coal Gas Diesel Nuclear Hydro Res
File NoCEA-CH-14-1142018-Coordination Division
Progress of Transmission Sector in the Country up to Oct 2018
1 TRANSMISSION LINES (All fig in CKM)
At the end of
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
6th plan 0 0 0 0 0 0 0 0 0 0 0 0 1831 4198 0 6029 1641 44364 0 46005 3472 48562 0 52034
7th plan 0 0 0 0 0 0 0 0 0 0 0 0 13068 6756 0 19824 4560 55071 0 59631 17628 61827 0 79455
8th plan 0 0 0 0 1634 0 0 1634 0 0 0 0 23001 13141 0 36142 6564 73036 0 79600 31199 86177 0 117376
9th plan 0 0 0 0 3234 1504 0 4738 751 409 0 1160 29345 20033 0 49378 8687 88306 0 96993 42017 110252 0 152269
10th plan 0 0 0 0 4368 1504 0 5872 1775 409 0 2184 48708 24730 0 73438 9444 105185 0 114629 64295 131828 0 196123
11th Plan 0 0 0 0 5948 1504 1980 9432 4839 411 0 5250 71023 30191 5605 106819 10140 125010 830 135980 91950 157116 8415 257481
12th Plan 6124 0 0 6124 5948 1504 1980 9432 25465 1177 4598 31240 92482 48240 17065 157787 11014 151276 978 163268 141033 202197 24621 367851
13th Plan (Up
to Mar2018)6124 0 0 6124 5948 1504 1980 9432 28666 1512 4881 35059 98247 54286 19067 171600 11258 156497 1000 168755 150243 213799 26928 390970
13th Plan (Up
to Sep-18)6124 0 0 6124 5948 1504 1980 9432 30952 1512 5059 37523 99683 56069 20662 176414 11318 160958 1000 173276 154025 220043 28701 402769
27150
75050
47900
118050
90650
30
IR addition in 12th Plan (up to
March 2017)
Total IR (up to Oct-18)
IR at the end of 11th Plan
IR at the end of 12th Plan
Envisaged IR Capacity at the end
of 13th Plan
Grand Total
Note - The figure upto the end of 10th plan in for stringing progress including the lines not commissioned Now only commissioned lines are reckoned Accordingly the figure for 10th plan (end) may read as 187555 after adjusting with (-) 10852 Ckm
Inter-regional Power Transfer Capacity
plusmn 800 kV HVDC plusmn 500 kV HVDC 765 kV 400 kV 220 kV
File NoCEA-CH-14-1142018-Coordination Division
2004-05 27800
2005-06 28100
2006-07 30200
2007-08 33000
2008-09 35500
2009-10 36700
2010-11 38700
2011-12 41756
2012-13 45460
2013-14 48940
2014-15 53040
2015-16 54590
2016-17 57430
2017-18 60800
Year
2005-06
2006-07
2007-08
2008-09
2009-10
2010-11
2011-12
2012-13
2013-14
2014-15
2015-16
2016-17
2017-18
2004-05 254 209 7568
2005-06 260 221 7636
2006-07 276 227 7423
2007-08 293 239 7727
2008-09 340 263 8713
2009-10 355 268 8870
2010-11 398 303 11975
2011-12 455 330 13514
2012-13 501 376 14867
2013-14 518 175
2014-15 520
6719
7171
3 All India yearly Coal Consumption for Power Generation (Utilities)
YEARCoal Consumption
Million Tonnes
4 All India Annual per Capita consumption of Electricity Since 2006
Per Capita Consumption ( kWh)
6314
(GrossGen+ Net Import) Mid-year population
5 Average cost of power supply amp average realization ( paiseKWH )
Yearcost of supply
(paiseunit)
Realization(paiseunit)
Including AgricultureOnly
Agriculture
1149
7335
7786
91441
8188
88363
957
1010
1075
1122
File NoCEA-CH-14-1142018-Coordination Division
Source- PFC Reports on the performance of State Power Utilities 31
File NoCEA-CH-14-1142018-Coordination Division
Sl
NoExecuting Agency
Installed
Capacity (MW)Cost (Rs crore)
Date of
Clearance
32
No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification
since 2004-05
65291374575 296361511th Plan
Cumu upto End of 11th Plan
596556 21212860
557439Cummulative up to end of 12th Plan
46708
18423975
499150
2003-042004-05
5743
9769
Cumu upto End of 10th Plan
010407 to 310308
010410 to 310311557976840909
010411 to 310312
412667
86293726
3207
482864
12632
1576036
4451722594
15455554
2314176
397343611750
2093311060316074
65109527813884
6 Growth Of Rural Electrification amp Pumpsets Energisation
Plan Year
9th Plan2002-03
134092626
4111
Pump Sets Energised Villages Electricfied (Nos)
2001-02
284064367244
1218
27801997-981998-991999-002000-01
297594
010408 to 310309010409 to 310310
10th Plan
2005-062006-07
322968331020
Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as
Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received
from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made
available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified
villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is
independent of the earlier published reports
No Hydro Electric Project has been issued concurrenceAppraisal letter by CEA during October 2018
7 Status of Hydro Schemes Cleared by the CEA in Oct-2018
Name of Scheme
File NoCEA-CH-14-1142018-Coordination Division
SN Contents Page
1 Rate of sale of power for the year 2016-17 33-41
RATE OF SALE OF POWER FOR THE YEAR 2016-17
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) NORTHERN REGION
CENTRAL SECTOR
BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 18000 66900 19800
CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 54000 222400 21600
CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 30000 144400 19600
CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 23100 91700 42600
PARBATI - III HPS NHPC LTD HYDRO-HYDRO 52000 68200 54800
DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 28000 95600 30000
CHUTAK NHPC LTD HYDRO-HYDRO 4400 22000 79800
DULHASTI HPS NHPC LTD HYDRO-HYDRO 39000 228000 56400
SALAL HPS NHPC LTD HYDRO-HYDRO 69000 342300 11000
TANAKPUR HPS NHPC LTD HYDRO-HYDRO 9420 43000 29600
URI HPS -I NHPC LTD HYDRO-HYDRO 48000 280300 16000
URI HPS - II NHPC LTD HYDRO-HYDRO 24000 147300 48600
NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 4500 24600 88200
SEWA - II NHPC LTD HYDRO-HYDRO 12000 47100 43400
ANTA CCPP NTPC LTD THERMAL-GASN 41930 67539 32400
AURAIYA CCPP NTPC LTD THERMAL-GASN 66336 53501 39100
BADARPUR TPS NTPC LTD THERMAL-COAL 70500 159153 44800
DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 84000 296170 42300
DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 98000 526686 46300
DADRI CCPP NTPC LTD THERMAL-GASHSD 82978 227469 33000
FARIDABAD CCPP NTPC LTD THERMAL-GASN 43159 115577 30800
RIHAND STPS I NTPC LTD THERMAL-COAL 100000 596766 24500
RIHAND STPS II NTPC LTD THERMAL-COAL 100000 737069 24600
RIHAND STPS III NTPC LTD THERMAL-COAL 100000 706546 30600
SINGRAULI STPS NTPC LTD THERMAL-COAL 200000 1394068 20400
TANDA TPS NTPC LTD THERMAL-COAL 44000 295438 40800
UNCHAHAR TPS I NTPC LTD THERMAL-COAL 42000 256454 39800
UNCHAHAR TPS II NTPC LTD THERMAL-COAL 42000 273577 38900
UNCHAHAR TPS III NTPC LTD THERMAL-COAL 21000 142780 43000
KOLDAM NTPC LTD HYDRO-HYDRO 80000 363260 43600
NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 303575 25841
RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 108000 668677 35374
NJHPS SJVNL HYDRO-HYDRO 150000 699496 23820
RAMPUR HPS SJVNL HYDRO-HYDRO 41202 195982 32260
TEHRI HPP THDC HYDRO-HYDRO 100000 272543 51800
KOTESHWAR HEP THDC HYDRO-HYDRO 40000 106244 53400
IGSTPS JHAJJAR ARAVALI P CPL THERMAL-COAL 150000 510429 49490
NEYVELI BARSINGSAR NEYVELI LIG CORP LTD THERMAL-LIG 25000 127520 38040
STATE SECTOR
PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 21000 14222 48200
PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 21000 19205 48400
PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 25000 102257 42600
PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 25000 62107 41800
DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 60000 312213 41000
RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 120000 35767442200
WYC HYDEL STATION HPGCL HYDRO-HYDRO 6240 20365 24900
GIRI POWER HOUSE HPSEB HYDRO-HYDRO 6000 13958 7600
ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 1695 5467 11900
BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 12000 18528 6700
GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 2250 7462 22500
BASSI POWER HOUSE HPSEB HYDRO-HYDRO 6600 29649 7500
BINWA POWER HOUSE HPSEB HYDRO-HYDRO 600 2749 19300
ANNEXURE-I
RATE OF SALE OF POWER FOR THE YEAR 2016-2017
Page 33
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) GAJ POWER HOUSE HPSEB HYDRO-HYDRO 1050 2914 26700
BANER POWER HOUSE HPSEB HYDRO-HYDRO 1200 2864 16200
HOLI POWER HOUSE HPSEB HYDRO-HYDRO 300 616 22500
THIROT POWER HOUSE HPSEB HYDRO-HYDRO 450 1126 22500
KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 1200 3064 22500
LARJI POWER HOUSE HPSEB HYDRO-HYDRO 12600 53677 23700
NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 250 750 31000
CHABA POWER HOUSE HPSEB HYDRO-HYDRO 175 465 23300
RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 150 101 13400
SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 200 000 22500
KILLAR HPSEB HYDRO-HYDRO 030 050 22500
BHABA AUGUMENP H HPSEB HYDRO-HYDRO 450 1276 22500
BS CHAMBA HPSEB HYDRO-HYDRO 045 099 19500
GUMMA HPSEB HYDRO-HYDRO 300 423 22500
GAS TURBINE POWER STATION IPGCL THERMAL-GAS 27000 67233 39300
PPS-I PPCL THERMAL-GAS 33000 175905 38300
PPS-III PPCL THERMAL-GAS 137120 196879 36100
LOWER JHELUM JampKPDD HYDRO-HYDRO 10500 60214 5100
UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 2260 10514 6300
UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 10500 44202 8500
GANDHARBAL JampKPDD HYDRO-HYDRO 1500 8925 4700
KARNAH MPH JampKPDD HYDRO-HYDRO 200 1122 31000
CHENANI I JampKPDD HYDRO-HYDRO 2330 10892 6600
CHENANI II JampKPDD HYDRO-HYDRO 200 1188 9300
CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 750 3634 14200
IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 375 2108 18500
IGO MERCHELLONG JampKPDD HYDRO-HYDRO 300 1572 29700
PAHALGAM MHP JampKPDD HYDRO-HYDRO 450 1713 32900
MARPACHOO JampKPDD HYDRO-HYDRO 075 375 29800
HAFTAL JampKPDD HYDRO-HYDRO 100 483 28700
SANJAK JampKPDD HYDRO-HYDRO 126 441 36000
SEWA-III JampKPDD HYDRO-HYDRO 900 3273 20200
BHADERWAH JampKPDD HYDRO-HYDRO 150 935 8900
BAZGO JampKPDD HYDRO-HYDRO 030 108 33300
SUMOOR JampKPDD HYDRO-HYDRO 010 045 35400
HUNDER JampKPDD HYDRO-HYDRO 040 176 26200
STAKNA JampKPDD HYDRO-HYDRO 400 1933 4100
KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 124000 662879 31360
SURATGARH TPS RRVUNL THERMAL-COAL 150000 402328 41730
CHHABRA TPS 1amp 2 RRVUNL THERMAL-COAL 50000 305946 36700
CHHABRA TPS 3 RRVUNL THERMAL-COAL 25000 151536 36700
CHHABRA TPS 4 RRVUNL THERMAL-COAL 25000 155896 36700
RAMGARH GT POWER PROJECT RRVUNL THERMAL-COAL 22050 43177 41800
RAMGARH GAS T P PROJECT 3 RRVUNL THERMAL-GAS 5000 93615 41800
DHOLPUR C C POWER PROJECT RRVUNL THERMAL-R-LNG 33000 9486 46110
MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 14000 20855 34192
MINI MICRO HYDEL (MMH) P S RRVUNL HYDRO-HYDRO 2385 851 37800
KALISINDH TPP 1 RRVUNL THERMAL-COAL 60000 341543 45000
KALISINDH TPP 2 RRVUNL THERMAL-COAL 60000 211588 45000
KHARA HEP UPJVNL HYDRO-HYDRO 7200 26654 7200
MATATILLA HEP UPJVNL HYDRO-HYDRO 3060 12219 6500
OBRA HEP UPJVNL HYDRO-HYDRO 9900 21517 6300
RIHAND UPJVNL HYDRO-HYDRO 30000 57369 5500
ANPARA A TPS UPRVUNL THERMAL-COAL 63000 317536 27000
ANPARA B TPS UPRVUNL THERMAL-COAL 100000 705605 22700
ANPARA D UPRVUNL THERMAL-COAL 100000 300158 39800
HARDUAGANJ TPS UPRVUNL THERMAL-COAL 16500 45817 49200
HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 50000 304389 46600
OBRA A TPS UPRVUNL THERMAL-COAL 28800 13158 34000
OBRA B TPS UPRVUNL THERMAL-COAL 100000 328124 21900
Page 34
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) PANKI TPS UPRVUNL THERMAL-COAL 21000 66488 50300
PARICHHA TPS UPRVUNL THERMAL-COAL 22000 38762 49400
PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 42000 231931 45600
PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 50000 276722 50400
CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 24000 70845 8290
CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 14400 75366 8390
DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 3375 9595 12080
DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 5100 18701 10520
KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4140 17359 12330
KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 12000 33001 9420
KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 3000 11953 8320
TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 9000 33983 12460
MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 30400 124510 16110
RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 19800 17897 10550
MPUR UTTARAKHAND JVNL HYDRO-HYDRO 930 5121 19200
PATHRI UTTARAKHAND JVNL HYDRO-HYDRO 2040 11636 14200
GALOGI UTTARAKHAND JVNL HYDRO-HYDRO 300 648 12500
PRIVATE SECTOR
MGTPP CLP INDIA PVT LTD THERMAL-COAL 132000 268902 41940
SHRINAGAR HEP ALAKNANDA HPCL HYDRO-HYDRO 33000 127414 48800
GAMA INFRAPROP CCPP GAMA INFRAPROP PVT THERMAL-GAS 22500 52686 47000
PPGCL (BARA) JP POWER VENTURES LTD THERMAL-COAL 198000 448200 38500
MALANA HEP MALANA PCL HYDRO-HYDRO 8600 26354 29792
MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 10000 30369 32580
ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 19200 56347 36079
KASHANG HEP H P PCL HYDRO-HYDRO 19500 5034 29200
BASPA-II HEP HBPCL HYDRO-HYDRO 30000 132769 13600
KARCHAM WANGTOO HEP HBPCL HYDRO-HYDRO 100000 434386 36600
RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 108000 582600 43700
RITHALA COMBI CY POWER PLANT TATA POWER DDL THERMAL-GAS 9480 000 11900
RAJPURA TPS NABHA POWER LTD THERMAL-GAS 140000 901484 39000
TALWANDI SABO POWER LTD TALWANDI SABO POWER LTD THERMAL-COAL 198000 636040 49548
ROJA THERMAL POWER STATION ROJA POWER SCL THERMAL-COAL 120000 727200 43400
KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 34400 63400
BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 36000 62600
MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 38200 60800
UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 37900 61500
KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 42300 58800
LALITPUR PGCL BAJAJ ENERGY PVT LTD THERMAL-COAL 198000 359400 47300
PRAYAGRAJ PGCL PRAYAGRAJ PGCL THERMAL-COAL 132000 448200 38595
KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 132000 783182 33438
WESTERN REGION
CENTRAL SECTOR
INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 100000 325333 23892
OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 52000 141663 34001
GANDHAR CCPP NTPC LTD THERMAL-GAS 65739 221924 28700
KAWAS CCPP NTPC LTD THERMAL-GASN 65620 167929 27000
KORBA I amp II NTPC LTD THERMAL-COAL 210000 1499171 20500
KORBA III NTPC LTD THERMAL-COAL 50000 358746 26600
SIPAT STPS I NTPC LTD THERMAL-COAL 198000 1479902 26800
SIPAT STPS II NTPC LTD THERMAL-COAL 100000 766549 26500
VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 126000 693142 25800
VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 100000 608781 23800
VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 100000 673475 27600
VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 100000 655924 32900
VINDHYACHAL STPS V NTPC LTD THERMAL-COAL 50000 328265 31700
MOUDA I NTPC LTD THERMAL-COAL 100000 343130 44500
MOUDA Ii NTPC LTD THERMAL-COAL 66000 40637 39900
RATNAGIRI GAS amp POWER PVT LTD RGPPL THERMAL-GAS 196708 442485 47000
KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 000 24729
TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 32000 201227 10740
Page 35
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 365122 19069
TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 787444 29324
STATE SECTOR
GSEG-HAZIRA15610 MW GUJARAT S ENEGEN LTD THERMAL-GAS 15610 1805 28200
GSEG-HAZIRA35143 MW GUJARAT S ENEGEN LTD THERMAL-GAS 35130 22276 51300
GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 21978 51800
AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 13929 26100
KORBA TPS EAST CSPGCL THERMAL-COAL 44000 198673 33880
DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 365808 27570
KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 316500 30420
HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 532878 19410
CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 515 58300
MTTPS CHAMPA U-I CSPGCL THERMAL-COAL 50000 220376 39000
MTTPS CHAMPA U-II CSPGCL THERMAL-COAL 50000 23709 10000
SHP GANGREL CSPGCL HYDRO-HYDRO 1000 2350 36790
BANGO HEP CSPGCL HYDRO-HYDRO 12000 14662 8900
MHP KORBA WEST CSPGCL HYDRO-HYDRO 170 859 38190
SIKASAR HEP CSPGCL HYDRO-HYDRO 700 418 26870
DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8843 74500
DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 19446 51500
GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 66388 71600
GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127488 41300
KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 96072 43900
KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 29841 56400
SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 184966 58800
UKAI 1-5 GSECL THERMAL-COAL 85000 204891 46900
UKAI TPS 6 GSECL THERMAL-COAL 50000 284448 48200
WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 271999 58300
WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 82808 44100
KADANA HPS GSECL HYDRO-HYDRO 24200 34433 16800
UKAI HPS GSECL HYDRO-HYDRO 30500 40585 6100
TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 123000 11500
BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 8900 10900
BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 7200 27500
JHINNA HPS MPPGCL HYDRO-HYDRO 2000 9700 18500
RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 44300 3400
GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 17300 4600
SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 4100 16900
MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 14600 27000
PENCH HPS MPPGCL HYDRO-HYDRO 16000 23700 8100
RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 3000 16900
AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 134400 35100
SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 283800 38700
SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 344600 34300
SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 111600 61600
SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 211800 58000
SSTPS PH-I MPPGCL THERMAL-COAL 120000 233100 84300
BHUSAWAL TPS MSPGCL THERMAL-COAL 142000 566258 51100
CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1365682 33700
KHAPERKHEDA MSPGCL THERMAL-COAL 134000 706207 39100
KORADI TPS MSPGCL THERMAL-COAL 62000 443206 42000
NASIK TPS MSPGCL THERMAL-COAL 63000 297275 47000
PARLI TPS MSPGCL THERMAL-COAL 113000 175934 71600
PARAS MSPGCL THERMAL-COAL 50000 267931 38700
URAN CCPP MSPGCL THERMAL-GAS 67200 320330 30600
KOYANA MSPGCL HYDRO-HYDRO 195600 328155 13100
SMALL HYDRO POWER PLANTS MSPGCL HYDRO-HYDRO 45400 93062 30500
BHIRA MSPGCL HYDRO-HYDRO 8000 10046 8400
TILLARI MSPGCL HYDRO-HYDRO 8900 10584 3100
SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 233298 20500
SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 87633 20500
PRIVATE SECTOR
Page 36
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 81282 46750
JNSTPP(JAYPEE NIGRIE) JP POWER VENTURES LTD THERMAL-COAL 132000 726695 29310
MB POWER MB POWER THERMAL-COAL 120000 345632 38310
ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 754922 28671
ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 780761 23495
ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 198000 1263784 32090
ADANI POWER MAHARA ADANI POWER LTD THERMAL-COAL 330000 1666191 34124
AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 170065 36827
SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 252035 45129
ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 458551 36000
ESSAR POWER MP LTD ESSAR POWER MP LTD THERMAL-COAL 60000 243040 28600
VEDANTA LTD (P P -I) VEDANTA LTD THERMAL-GAS 3000 15044 24000
VEDANTA LTD (P P -II) VEDANTA LTD THERMAL-GAS 3000 21293 24000
PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 8234600 24000
165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 5850 64390
145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 68717 40349
SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 132655 28776
SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 144686 38567
MUNDRA UMPPCOASTAL GUJARAT POWER
LTD THERMAL-IMP COAL 400000 2530300
23900
LANCO AMARKANTAK TPP PATHADIH
U-ILANCO AMARKAN POWER LTD THERMAL-COAL 30000 195500
29200
LANCO AMARKANTAK TPP PATHADIH
U-IILANCO AMARKAN POWER LTD THERMAL-COAL 30000 206900
27600
BARADARHA TPS D B POWER LTD THERMAL-COAL 120000 677373 29200
JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 405000 28900
JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 453000 40500
DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 339437 40700
TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 293400 44000
TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 137200 37000
TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 174900 44000
BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 92900 14100
BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23700 34300
KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 27600 48300
CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2530300 23900
BHANDARDRA HEP -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 2475 54900
SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 161400 26500
SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 445000 39000
SOTHERN REGION
CENTRAL SECTOR
NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 325699 54820
NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 305532 39880
NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 998805 38510
NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 113016 54070
NEYVELI TAMILNADU POWER LTD JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 625274 42200
VALLUR TPS NTPC TECL THERMAL-COAL 150000 856438 42350
R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 1493 84300
RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1502919 29400
RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 341291 31800
SIMHADRI I NTPC LTD THERMAL-COAL 100000 688382 36800
SIMHADRI II NTPC LTD THERMAL-COAL 100000 663657 43400
KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 593110 31324
MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 291625 21764
KKNPP-1 amp 2 NPCIL NUCLEAR-NUCLEAR 200000 572609 40948
MINICOY LAKSHADEEP THERMAL-DIESEL 340 770 29600
KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1097 29600
AMINI LAKSHADEEP THERMAL-DIESEL 265 509 29600
ANDROTT LAKSHADEEP THERMAL-DIESEL 219 524 29600
KALPENI LAKSHADEEP THERMAL-DIESEL 175 356 29600
AGATTI LAKSHADEEP THERMAL-DIESEL 195 658 29600
KADMAT LAKSHADEEP THERMAL-DIESEL 190 414 29600
KILTAN LAKSHADEEP THERMAL-DIESEL 150 269 29600
CHETLET LAKSHADEEP THERMAL-DIESEL 100 139 29600
BITRA LAKSHADEEP THERMAL-DIESEL 043 024 29600
BANGARAM LAKSHADEEP THERMAL-DIESEL 018 009 29600
Page 37
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) STATE SECTOR
Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 721811 46500
Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 50000 336142 46500
RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 237358 46500
RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 239926 46500
RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 124500 46500
SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 62109 46500
UPPER SILERU APGENCO HYDRO-HYDRO 24000 33000 46500
LOWER SILERU APGENCO HYDRO-HYDRO 46000 81066 46500
DONKARAI APGENCO HYDRO-HYDRO 2500 6007 46500
PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 1262 46500
CHETTIPETA APGENCO HYDRO-HYDRO 100 214 46500
MUCHKUND APGENCO HYDRO-HYDRO 12000 37571 46500
NAGARJUNASAGAR RCPH APGENCO HYDRO-HYDRO 9000 606 46500
TUNGABHADRA HES amp HAMPI(AP
Share)
APGENCO HYDRO-HYDRO 7200 6100 46500
KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 352232 42600
KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 288131 32500
KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 319272 46500
RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 40073 44300
KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 308317 46000
KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 308963 51300
SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 61004 76600
NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 17960 75300
PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 20873 58300
POCHAMPAD-I TSPGENCO HYDRO-HYDRO 2700 5455 29800
POCHAMPAD-II TSPGENCO HYDRO-HYDRO 900 1932 40700
NIZAMSAGAR TSPGENCO HYDRO-HYDRO 1000 1126 53400
RAICHUR TPS 1 to 7 KPCL THERMAL-COAL 147000 890866 43800
RAICHUR TPS 8 KPCL THERMAL-COAL 25000 159523 48200
BELLARI TPS 1 KPCL THERMAL-COAL 50000 318679 51100
BELLARI TPS 2 KPCL THERMAL-COAL 50000 232347 55600
BELLARI TPS 3 KPCL THERMAL-COAL 70000 47565 34400
BHADRA PH KPCL HYDRO-HYDRO 3920 2369 45900
GERUSUPPA PH KPCL HYDRO-HYDRO 24000 26990 22000
GHAT PRABHA HEP KPCL HYDRO-HYDRO 3200 4777 25300
KADRA HPS KPCL HYDRO-HYDRO 15000 16889 26800
NAGJHARI KPCL HYDRO-HYDRO 90000 155159 9800
KODASALLI DPH KPCL HYDRO-HYDRO 12000 14854 19200
MUNIRA+MGH+SPH+SPH KPCL HYDRO-HYDRO 22640 48211 7900
SHARAVATHY HPS KPCL HYDRO-HYDRO 108550 276215 5400
ALMATTI DPH KPCL HYDRO-HYDRO 29000 39611 24600
VARAHI UGPH KPCL HYDRO-HYDRO 46000 71368 15600
IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 17196 15300
IDUKKI HPS KSEB HYDRO-HYDRO 78000 137905 15300
KAKKAD HPS KSEB HYDRO-HYDRO 5000 13063 15300
KALLADA HPS KSEB HYDRO-HYDRO 1500 4436 15300
KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 46544 15300
KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 635 15300
LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 30822 15300
MALANKARA HPS KSEB HYDRO-HYDRO 1050 2474 15300
MATTUPETTY KSEB HYDRO-HYDRO 200 230 15300
MALAMPUZHA KSEB HYDRO-HYDRO 250 063 15300
CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 864 15300
URUMI ST I amp II KSEB HYDRO-HYDRO 615 903 15300
LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 248 15300
NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7765 19625 15300
PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 16601 15300
PANNIAR HPS KSEB HYDRO-HYDRO 3240 6217 15300
PORINGALKUTHU KSEB HYDRO-HYDRO 3600 10052 15300
PORINGALKUTHU LBE KSEB HYDRO-HYDRO 1600 9438 15300
PEPPARA KSEB HYDRO-HYDRO 300 395 15300
POOZHITHODE KSEB HYDRO-HYDRO 480 1045 15300
Page 38
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) PEECHI KSEB HYDRO-HYDRO 125 040 15300
RANI-PERUNADU KSEB HYDRO-HYDRO 400 585 15300
SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 79783 15300
SENGULAM HPS KSEB HYDRO-HYDRO 5120 11558 15300
SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 16711 15300
VILANGAD KSEB HYDRO-HYDRO 750 1578 15300
BARAPOLE KSEB HYDRO-HYDRO 1500 1932 15300
VELLATHOOVAL KSEB HYDRO-HYDRO 360 305 15300
CHIM0NY KSEB HYDRO-HYDRO 250 156 15300
ADYANPARA KSEB HYDRO-HYDRO 350 501 15300
BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 554 15300
KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 3801 15300
KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 23132 32800
ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 14416 62280
METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 523970 62280
METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 321270 62280
NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 336575 62280
NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 591240 62280
TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 508966 62280
KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 30897 62280
VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 18720 90699 62280
KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 33593 62280
BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 1047 62280
PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 1250 62280
PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 330 62280
MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 4897 62280
MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 032 62280
KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15681 62280
KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 40608 62280
KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 21342 62280
KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 4717 62280
KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4322 62280
KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2399 62280
METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 4416 62280
METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 8035 62280
BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2187 62280
BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2359 62280
BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2511 62280
BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 1949 62280
BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 1819 62280
POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 172 62280
SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 241 62280
MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 026 62280
THIRUMOORTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 136 62280
PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 9309 62280
VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 353 62280
SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 4192 62280
PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 6571 62280
SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 1186 62280
SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6319 62280
ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 6122 62280
KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 28674 62280
SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 18381 62280
SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 4258 62280
KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 12680 62280
KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4201 62280
ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 000 62280
PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 19175 62280
AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 078 62280
BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 504 62280
BHAVANI KATTALAI (BKB)(IIIampIII BB I amp II)TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 5847 62280
PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 000 62280
Page 39
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) SRI DAMODARAM STPS APPDCL THERMAL-COAL 160000 808108 36300
PRIVATE SECTOR
KARUPPUR TANJORE LANCO TANJORE PCL THERMAL-GAS 12000 48096 28770
SIMHAPURI ENERGY LTD SIMHAPURI ENERGY LTD THERMAL-COAL 60000 143900 39100
JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 7111 45500
SBU 1 JSW ENERGY LTD
VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 26000 159100
43300
SBU 2 JSW ENERGY LTD
VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 60000 247900
42800
LANCO KPLLANCO KONDAPALLI POWER
LTDTHERMAL-GAS 36814 85060
25776
LANCO KPL STG -IILANCO KONDAPALLI POWER
LTDTHERMAL-GAS 36600 12979
46330
LANCO KPL STG -IIIALANCO KONDAPALLI POWER
LTDTHERMAL-GAS 37100 85710
46330
LANCO KPL STG -III BLANCO KONDAPALLI POWER
LTDTHERMAL-GAS 37100 43639
46330
HINDUJA NATIONAL PCL HINDUJA NATIONAL PCL THERMAL-COAL 104000 303000 38200
MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 121164 49940
UDUPI POWER COR LTD ADANI POWER LTD THERMAL-COAL 120000 754613 42500
SPECTRUM POWER GENERATION
LTD SPECTRUM PG LTD THERMAL-GASN 20525 9256812
34952
TAQA NEYVELI POWER COM PVT
LTD TAQA NEYVELI THERMAL-LIG 25000 5840
34500
ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 251000 51000
ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 207860 36800
GMR VEMAGIRI POWER GENERATION
LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 30117
46450
EASTERN REGION
CENTRAL SECTOR
MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 64675 53113
MTPS STAGE - II KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 39000 1432 69138
BOKARO `B` TPS DVC THERMAL-COAL 63000 145670 31539
MEJIA TPS U 1-3 DVC THERMAL-COAL 63000 348298 31552
MEJIA TPS U 4 DVC THERMAL-COAL 21000 116099 34997
MEJIA TPS U 5-6 DVC THERMAL-COAL 50000 276427 35976
MEJIA TPS U 7-8 DVC THERMAL-COAL 100000 552854 36991
DURGAPUR STEEL TPS DVC THERMAL-COAL 100000 665550 39323
DURGAPUR TPS DVC THERMAL-COAL 21000 59270 35416
RAGHUNATHPUR TPS DVC THERMAL-COAL 120000 201650 35326
MAITHON HYDEL STA DVC HYDRO-HYDRO 6320 12200 17984
CHANDRAPURA TPSU1-3 DVC THERMAL-COAL 42000 257610 35095
CHANDRAPURA TPSU7-8 DVC THERMAL-COAL 50000 306673 34987
KODERMA TPS DVC THERMAL-COAL 100000 380180 38131
PANCHET HPS DVC HYDRO-HYDRO 8000 13360 17984
TILLAYA HPS DVC HYDRO-HYDRO 400 1410 17984
RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34700 35400
TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 277300 23200
TLDP -III NHPC LTD HYDRO-HYDRO 13200 55400 62000
TLDP -IV NHPC LTD HYDRO-HYDRO 16000 60300 25600
FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 957219 33700
FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 308943 41000
BONGAINGAON TPS NTPC LTD THERMAL-COAL 25000 153663 58600
KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 542277 34200
KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 942591 34200
BARH-II NTPC LTD THERMAL-COAL 132000 728021 44500
TALCHER TPS NTPC LTD THERMAL-COAL 46000 335521 30100
TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 702319 25600
TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1436521 24700
STATE SECTOR
BTPS(RampM) BIHAR STATE PGCL THERMAL-COAL 22000 12142 39700
BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 98331 10602
HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 50593 9482
CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 19689 2605
RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 53192 6033
UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 147208 14637
Page 40
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 60353 4519
IB TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 288567 25000
J P H GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 210 038 61100
MEYONG CHU GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 400 1086 61100
TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 122667 38200
DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 214339 43321
KOLAGHAT THERMAL POWER
STATION
WEST BENGAL PDCL THERMAL-COAL 126000 538269 31603
BAKRESHWAR THERMAL POWER
PLANT
WEST BENGAL PDCL THERMAL-COAL 105000 634876 32154
BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 45000 166855 33299
SANTHALDIH THERMAL POWER
STATION
WEST BENGAL PDCL THERMAL-COAL 50000 336442 34932
SAGARDIGHI THERMAL POWER
PROJECT
WEST BENGAL PDCL THERMAL-COAL 160000 423121 34705
JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 20344 68900
RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 24559 68900
TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 4623 68900
PURULIA PUMPED STORAGE
PROJECT
WEST BENGAL SEDCL HYDRO-HYDRO 90000 108816 68900
MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2768 68900
PRIVATE SECTOR
CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 49474 20230
CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 555500 70200
HALDIA ENERGY HALDIA ENERGY LTD THERMAL-COAL 60000 371000 50400
DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3688 63400
KAMALANGA TPS GMR KAMALANGA ENERGY LTD THERMAL-COAL 105000547670
33300
ADHUNIK POWER U-1 ADHUNIK POWER THERMAL-COAL 27000 158 44060
ADHUNIK POWER U-2 ADHUNIK POWER THERMAL-COAL 27000 168 44250
VL-JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 332800 23622
JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 43000 45250
JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 71700 37030
JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 70700 35920
JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 71100 38870
JOJOBERA UNIT 5 TATA POWER COM LTD THERMAL-COAL 12000 79300 44560
JOJOBERA UNIT 6 TATA POWER COM LTD THERMAL-WHR 12000 83700 12840
IEL KALINGANAGAR U-I TATA POWER COM LTD THERMAL-WG 6750 33400 22500
IEL KALINGANAGAR U-II TATA POWER COM LTD THERMAL-WG 6750 34800 22500
MAITHON UNIT 1 amp 2 TATA POWER COM LTD THERMAL-COAL 105000 678000 36100
HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 27500 24340
HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 28400 24340
HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 15800 24310
NORTH EASTERN REGION
CENTRAL SECTOR
LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 74100 36600
AGARTALA GT NEEPCO THERMAL-GAS 13500 88611 27210
ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 153111 32310
DOYANG HEP NEEPCO HYDRO-HYDRO 7500 25598 49801
KOPILI HEP NEEPCO HYDRO-HYDRO 20000 98186 11491
KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 19582 20237
KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 10310 17968
RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 124093 22945
TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 10100 17344 39000
STATE SECTOR
HYDRO POWER (122 Stns) ITANAGAR GOVT OF ARUNACHAL
PRADESHHYDRO-HYDRO 6971 6217270
24600
KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39514 17337
LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 82327 36810
NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 33318 48290
MYNTRIANG SHEP ST II ASSAM POWER GENCO HYDRO-HYDRO 300 567 35776
LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 9130 49200
LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 012 49200
DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 022 49200
TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 000 49200
UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 4990 16000
UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 6476 37000
UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 16494 14600
UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 3600 9556 15000
SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 758 8000
MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44070 44800
KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 154 41400
TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 091 41400
MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 411 41400
MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 394 41400
KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 760 41400
SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 3264 41400
LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 044 41400
BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 18953 28000
ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 43585 28200
GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 4080 11100
Note
LIG Lignite N Naptha WHR Waste Heat Recovery
Page 41
File NoCEA-CH-14-1142018-Coordination Division
Generation from
Conventional
Sources
Generation
from
Renewable
Sources
Total Generation from
Conventional Sources
Generation from
Renewable SourcesTotal
Growth in
Conventional
Generation
Growth in
Renewable
Generation
Growth in
Total
Generation
(BU) (BU) (BU) (BU) (BU) (BU) () () ()
113366 8500 121866 102879 6537 109416 1019 3003 1138
Note Tentative
SlNo
Source-Wise All
India
Generation
from
Renewables
Sep-2018 Sep-2017 April 2018- Sept 2018 April 2017- Sept 2017
1 Wind 6093345 3897076 45331034 37069611
2 Solar 3209923 2002513 17912711 10811454
3 Biomass 177174 273211 1382764 1741918
4 Bagasse 231358 270424 3154629 2085272
5 Small Hydro 993983 1021349 5335933 4727041
6 Others 32159 24319 209731 173991
Total 10737943 7488892 73326802 56609286
Note 1) All figures are provisional
2) Data as received from SLDC of the respective states or from the electricity department
Electricity Generation (Conventional and Renewable Sources)
Oct-2018 Oct-2017 Growth
1B
For the Month of Cummulative for the period
All India Generation From Renewables (All Figures are in MU)
File NoCEA-CH-14-1142018-Coordination Division
Achievement Targets Achievement
Oct-17
Thermal 0 1280 600 NA
Hydro 30 0 0 000
Nuclear 0 0 0 NA
All India 30 1280 600 200000
April 2017- Oct 2017 April 2018- Oct 2018 Change
Thermal 4300 670 -84
Hydro 308 140 -55
Nuclear 0 0 NA
All India 4608 810 -82
Note Lakwa Replacement Power Project (69755 MW) had achieved COD on 260418 but
the intimation regarding COD was received in Oct18 (Additional Capacity addition)
2
2 Generating Capacity Addition for Oct-2018 (MW)
Generating Capacity Addition during April 2017- Oct 2017 amp April 2018- Oct 2018
NA- Not Applicable
Change wrt
Oct-2017Type
Oct-18
300
6000
0
100
200
300
400
500
600
700
1Oct-17 Oct-18
0
500
1000
1500
2000
2500
3000
3500
4000
4500
5000
April 2017- Oct 2017 April 2018- Oct 2018
File NoCEA-CH-14-1142018-Coordination Division
(i)
(ii)
(iii)
Nuclear Hydro RES Grand TotalRegion Coal Gas Diesel Total
Northern 5128020 578126 000 5706146 162000 1970777 1363391 9202314
Western 7120862 1080649 000 8201511 184000 754750 2102418 11242679
Southern 4578202 647366 76158 5301726 332000 1183803 3597107 10414636
Eastern 2720164 10000 000 2730164 000 494212 108364 3332740
North-East 52002 177581 3600 233183 000 145200 28745 407128
Islands 000 000 4005 4005 000 000 1256 5261
ALL INDIA 19599250 2493722 83763 22176734 678000 4548742 7201281 34604757
Note Captive Genaration is not included in the total Captive Power capacity as on 31032017 RES as on 30092018 3
Thermal
Nuclear
3 List of Projects Commissioned During Oct-2018
4 All India Installed Capacity (MW) Region-wise as on 31-10-18
Mahan TPP of Essar Power MP ltd of capacity 600 MW was commissioned on 07102018
NIL
Thermal
NIL
Hydro
22176734
678000
4548742
7201281
34604757
51529
000
5000000
10000000
15000000
20000000
25000000
30000000
35000000
40000000
Thermal Nuclear Hydro RES Total Captive
Thermal Nuclear Hydro RES Total Captive
Total = 34604757
File NoCEA-CH-14-1142018-Coordination Division
Sector
Coal Gas Diesel Total
State 6359650 711871 36393 7107913 000 2994200 200887 10303000
Private 7614600 1058060 47370 8720030 000 339400 6850164 15909594
Central 5625000 723791 000 6348791 678000 1215142 150230 8392163
All India 19599250 2493722 83763 22176734 678000 4548742 7201281 34604757
State 10303000
Private 15909594
Central 8392163
Electricity Generation (MU) Targets and Achievements for 2016-17
5 All India Installed Capacity (MW) Sector-wise as on 31-10-18
4
Grand TotalTHERMAL
Nuclear Hydro RES
RES as on 30092018
State 10303000 30
Private 15909594 46
Central 8392163 24
All India Installed Capacity(MW) as on 31-10-2018 (Sector-Wise)
File NoCEA-CH-14-1142018-Coordination Division
Voltage Level
+- 500 KV HVDC
+- 800 KV HVDC
765 KV
400 KV
220 KV
All India
Voltage Level
+- 500 KV HVDC
+- 800 KV HVDC
765 KV
400 kV
220 KV
All India
5
0 0
6 Transmission Lines Added during Oct-2018 (Ckms)
Oct-17 Oct-18
0 0
0 0
0 729
245 737
324 401
569 1867
Transmission Lines Added duringApril 2017- Oct 2017 ampApril 2018- Oct 2018 (Ckms)
April 2017- Oct 2017 April 2018- Oct 2018
2151 4521
13120 11799
0 0
2046 2464
8923 4814
569
1867
0
500
1000
1500
2000
All India
Ckm
s
Oct-17 Oct-18
13120
11799
11000
11500
12000
12500
13000
13500
All India
Ckm
s
April 2017- Oct 2017 April 2018- Oct 2018
File NoCEA-CH-14-1142018-Coordination Division
Voltage Level
+- 800 KV HVDC
+- 500 KV HVDC
765 KV
400 KV
220 KV
All India
Voltage Level
+- 800 KV HVDC
+- 500 KV HVDC
765 KV
400 KV
220 KV
All India
6
7 Transformation Capacity Addition During Oct-2018 (MVA)
0
0
2575
1025
0 0
Oct-17 Oct-18
3600
0
3000
9840
4620
2220
3000 0
All India Transformation Capacity Addition during April 2017- Oct 2017 amp April
2018- Oct 2018 (MVA)
41790
0
14000
17180
10610
45665
10000
23020
9645
0
April 2017- Oct 2017 April 2018- Oct 2018
3600
9840
0
2000
4000
6000
8000
10000
12000
MV
A
Oct-17 Oct-18
4566541790
0
74520
1
MV
A
April 2017- Oct 2017 April 2018- Oct 2018
File NoCEA-CH-14-1142018-Coordination Division
Oct-2017 Oct-2018 Oct-2017 Oct-2018 Oct-2017 Oct-2018
Northern 31786 31822 31096 31375 -22 -14
Western 31728 36308 31628 36178 -03 -04
Southern 24314 29392 24271 29342 -02 -02
Eastern 12012 12547 11931 12507 -07 -03
North Eastern 1487 1387 1451 1351 -24 -25
All India 101327 111455 100377 110753 -09 -06
Oct-2017 Oct-2018 Oct-2017 Oct-2018 Oct-2017 Oct-2018
Northern 51307 50659 50289 49635 -20 -20
Western 48530 56548 46392 55695 -44 -15
Southern 39142 45279 38905 45226 -06 -01
Eastern 19850 22959 19836 22567 -01 -17
North Eastern 2596 2790 2499 2700 -37 -32
All India 162027 172945 157394 170604 -29 -14
Oct-2018 Figures are Provisional
7
8 Power Supply Position (Energy amp Peak) in Oct-2018
Peak Demand Peak Met
Requirement Availability
Energy (MU)Region
Surplus(+)
Deficit (-) in
Surplus(+)
Deficit (-) in Region
Power (MW)
File NoCEA-CH-14-1142018-Coordination Division
Chandigarh Delhi Haryana HP JampK Punjab Rajasthan UP Utrakhand Oct-2017 0 0 0 0 516 0 0 0 0
Oct-2018 0 0 0 0 567 0 0 688 0
Chattisgarh Gujarat MP Maharastra Daman amp Diu Dadar Nagar Goa
Oct-2017 16 0 13 2062 0 0 25
Oct-2018 146 19 39 705 1 4 0
AP Telangana Karnataka Kerala Tamil Nadu Puducherry Lakshadweep
Oct-2017 18 19 0 211 38 2 0
Oct-2018 0 0 0 83 414 1 0
8
9 Peak Shortage of Power Supply (MW) in Different Regions in Oct-2018
0 0 0 0
567
0 0
688
00 0 0 0
516
0 0 0 0
0
400
800
Chan
dig
ar
h
Delh
i
Hary
ana
HP
Jamp
K
Pu
nj
ab
Raja
sth
an
UP
Utr
ak
hand
MW
Northern States (MW) Oct-2018 Oct-2017
146
19
39 705
1 4 016
0 13
2062
0 0 25
0
5000
Ch
attis
garh
Guja
rat
MP
Mah
ara
st
ra
Da
man amp
Diu
Da
dar
Na
gar G
oaM
W
Western States (MW) Oct-2018 Oct-2017
0 0 083
414
1 018 19 0
211
38 2 00
500
AP Telangana Karnataka Kerala Tamil Nadu Puducherry Lakshadweep
Southern State (MW) Oct-2018 Oct-2017
File NoCEA-CH-14-1142018-Coordination Division
Bihar DVC Jharkhand Odisha West Bengal Sikkim AampN Island
Oct-2017 6 0 0 0 8 0 4
Oct-2018 0 0 0 400 0 0 4
Arunachal Assam Manipur Meghalaya Mizoram Nagaland Tripura
Oct-2017 6 77 4 0 2 2 12
Oct-2018 13 81 2 0 2 3 0
9
0 0 0
400
0 0 46 0 0 0 8 0 4
0100200300400500
Bih
ar
DV
C
Jha
rkh
an
d
Od
ish
a
We
st
Be
ng
al
Sik
kim
Aamp
NIs
land
MW
Eastern States (MW) Oct-2018 Oct-2017
13
81
2 0 2 3 06 4 0 2 2
12
0
100
Aru
na
ch
al
Assa
m
Ma
nip
ur
Meghal
aya
Miz
ora
m
Na
gala
nd
Trip
ura
MW
North-Eastern States (MW)
File NoCEA-CH-14-1142018-Coordination Division
Sector Oct-2017 Oct-2018
Central 6872 7355
State 5217 6078
Private 6045 6819
ALL INDIA 5882 6524
Month PLF 2017 PLF 2018
Jan 6014 6288
Feb 6153 6285
March 6313 6558
April 6493 6458
May 6355 6554
June 5672 5917
July 537 5545
Aug 5733 5639
Sep 5989 6109
Oct 5882 6524
For Coal and Lignite based Power Plants and Provisional based on Actual-Cum-Assesment
10
PLF of Thermal Power Plants
All India PLF of Thermal Plants (Excluding Gas Based Plants) Month-wise
10 All India PLF Sector-wise for Oct-2018
68
72
52
17
60
45
58
8273
55
60
78
68
19
65
24
000
1000
2000
3000
4000
5000
6000
7000
8000
Central State Private ALL INDIA
P
LF
Oct-2017 Oct-2018
0
10
20
30
40
50
60
70
Jan Feb March April May June July Aug Sep Oct
Months
All India PLF Month-wise
PLF 2017 PLF 2018
File NoCEA-CH-14-1142018-Coordination Division
2012-13 2013-14 2014-15 2015-16 2016-17
TampD Losses 2304 2284 2277 2181 2142
ATampC Losses 2548 2258 2462
Note As per PFC for utilities selling directly to consumers
Total Number of Villages
597464
Note From the year 2004-05 onwards Definition of Village Electrification-
A village would be declared Electrified if
Without
Subsidy
Gap ACS-
ARR(
Without
Subsidy)
Paiseunit
Gap ACS-
ARR (on
subsidy
booked
basis)
paiseunit
Gap ACS-
ARR (on
subsidyrece
ived basis)
paiseunit
2013-14 400 118 76 77
2014-15 412 108 58 60
Source- PFC Reports on the performance of State Power Utilities
2013-14 4894
2014-15 5304
2015-16 5459
2016-17 5743
2017-18 6080
11
Average cost of supply(ACS)
(paiseunit)
i) Basic Infrastructure such as Distribution Transformer and Distribution lines are provided in the inhabited locality
as well as Dalit Basti hemlet where it exists (For electrification through Non-Conventional Energy Sources a
Distribution Transformer may not be necessary)
14 All India Coal consumption for Power Generation (MT)
520
Average Revenue Realization(paiseunit)
518
Year
ii) Electricity is provided to Public places like Schools Panchayat Office Health Centre Dispensaries Community
Centres etc and
iv) Mandatory Certification from Gram Panchayat regarding the completion of village electrification should be
obtained
13 Average cost of Power amp Average Realisation
iii) The number of households electrified should be at least 10 of the total number of households in the village
11 T amp D and ATampC Losses ()
12 All India Village Electrification
Villiages Electrified (Nos)
10000All villages as per census 2011 has
been electrified on 28042018
Villages electrified
File NoCEA-CH-14-1142018-Coordination Division
SN Contents Page
1 Capacity Addition Targets and Achievements in 12th Plan 12
2 Capacity Addition Targets amp Achievements during Oct-2018 and April 2018- Oct 2018 13
3 Installed Capacity in various Regions including their shares 14-19
Section B - Capacity Addition
File NoCEA-CH-14-1142018-Coordination Division
Figures in MW
TARGET ACH TARGET ACH TARGET ACH TARGET ACH
CENTRAL 14878 15869 6004 2584 5300 2000 26182 20453
STATE 13922 22201 1608 2276 0 0 15530 24477
PRIVATE 43540 53661 3285 619 0 0 46825 54280
ALL INDIA 72340 91730 10897 5479 5300 2000 88537 99209
Figures in MW
Thermal Hydro Nuclear Total
Target Ach Target Ach Target Ach Target Ach
Central 4880 3170 800 390 500 6180 3560 5761
State 3546 1760 300 200 0 3846 1960 5096
Private 2940 3780 205 205 0 3145 3985 12671
Total 11366 8710 1305 795 500 0 13171 9505 7217
12
2 CAPACITY ADDITION TARGET AND ACHIEVEMENT FOR 2017-18 (IN MW)
1 Capacity Addtion Targets and Achievements in the 12th Plan
SECTORTHERMAL HYDRO NUCLEAR TOTAL
File NoCEA-CH-14-1142018-Coordination Division
(MW)
Cummulative
Deviation
Target Achievement Target Achievement (+) (-)
Central 2760 250 0 250 0 -250
State 450615 1030 0 1030 69755 -960245
Private 0 0 600 0 600 600
Total 726615 1280 600 1280 669755 -610245
Central 710 0 0 110 110 0
State 130 0 0 12999 30 -9999
Private 0 0 0 0 0 0
Total 840 0 0 23999 140 -9999
Nuclear Central 0 0 0 0 0 0
Central 3470 250 0 360 110 -250
State 463615 1030 0 115999 99755 -1060235
Private 0 0 600 0 600 600
Total 810615 1280 600 151999 809755 -710235
Electricity Generation (MU) Targets and Achievements for 2016-17
13
2 Capacity Addition Targets Achievements During Oct-2018
Schemes Sector
Target 2018-19
April 2018- Oct 2018Oct-18
Hydro
All India
Capacity Addition TargetsAchievements during the Month of Oct-2018
Thermal
12
80
24
0
0
15
20
67
0
14
0
0
81
0
0
200
400
600
800
1000
1200
1400
1600
Thermal Hydro Nuclear Total
MW
Targets and Achievement during 2018-19Target Achievement
600
0 00 0
600
0
100
200
300
400
500
600
700
800
900
1000
Target Achievement
MW
Targets and Achievement during Oct 2018Thermal Hydro
Nuclear Total
File NoCEA-CH-14-1142018-Coordination Division
Coal Gas Diesel Total
State 1593400 287920 000 1881320 000 869755 68956 2820031
Private 2276083 55800 000 2331883 000 251400 1261535 3844818
Central 1258537 234406 000 1492943 162000 849622 32900 2537465
Sub Total 5128020 578126 000 5706146 162000 1970777 1363391 9202314
State 2128000 284982 000 2412982 000 544650 31119 2988751
Private 3488567 467600 000 3956167 000 48100 2005170 6009437
Central 1504295 328067 000 1832362 184000 162000 66130 2244492
Sub Total 7120862 1080649 000 8201511 184000 754750 2102418 11242679
State 1943250 79198 28788 2051236 000 1183803 52102 3287141
Private 1212450 532210 47370 1792030 000 000 3495815 5287845
Central 1422502 35958 000 1458460 332000 000 49190 1839650
Sub Total 4578202 647366 76158 5301726 332000 1183803 3597107 10414636
State 695000 10000 000 705000 000 353792 22511 1081303
Private 637500 000 000 637500 000 39900 84853 762253
Central 1387664 000 000 1387664 000 100520 1000 1489184
Sub Total 2720164 10000 000 2730164 000 494212 108364 3332740
State 000 49771 3600 53371 000 42200 25674 121245
Private 000 2450 000 2450 000 000 2571 5021
Central 52002 125360 000 177362 000 103000 500 280862
Sub Total 52002 177581 3600 233183 000 145200 28745 407128
State 000 000 4005 4005 000 000 525 4530
Private 000 000 000 000 000 000 221 221
Central 000 000 000 000 000 000 510 510
Sub Total 000 000 4005 4005 000 000 1256 5261
State 6359650 711871 36393 7107913 000 2994200 200887 10303000
Private 7614600 1058060 47370 8720030 000 339400 6850164 15909594
Central 5625000 723791 000 6348791 678000 1215142 150230 8392163
Total 19599250 2493722 83763 22176734 678000 4548742 7201281 34604757
Figures at decimal may not tally due to rounding off
Note -
(As per latest information available with MNRE)
Break up of RES all India as on 30092018 is given below (in MW)
450695 3461510 2402166 7201281
A Oct 2018 669755 MW
B Capacity Retired
during
Oct 2018 705 MW
C Oct 2018 0 MW
D Oct 2018 A-B+C -35245 MW
Share of Telangana from JEGURUPADU CCPP Ph II has been removed and the same has been added to private sector of Andhra Pradesh due to expiry of PPA as per
request from TS Transco
Region
ALL INDIA INSTALLED CAPACITY (IN MW) OF POWER STATIONS (As on 31102018)
(UTILITIES)
Net Capacity Added during
1 RES include SHP BP UampI Solar and Wind Energy Installed capacity in respect of RES (MNRE) as on 30092018
Small
Hydro PowerWind Power
Bio-PowerSolar Power
Total
CapacityBM PowerCogen Waste to Energy
2 U-1 to 7 (76995=69755 MW) of LAKWA REPLACEMENT POWER PROJECT commissioned in April 2018 but intimated in October 2018
has been added to state sector of Assam
1 Badarpur TPS (705 MW) has been retired from central sector of Northern Region
Capacity Up-rated
Ownership Sector
873080 13830
Capacity Added during
1 U-2 (600 MW) of MAHAN TPP has been commissioned and added to private sector of Madhya Pradesh
Grand TotalThermalNuclear Hydro
Islands
ALL INDIA
Abbreviation- SHP=Small Hydro Project (le 25 MW) BP=Biomass Power UampI=Urban amp Industrial Waste Power RES=Renewable Energy Sources
Northern Region
Western Region
Southern Region
Eastern Region
North Eastern
Region
RES
(MNRE)
Modewise breakup
File NoCEA-CH-14-1142018-Coordination Division
Coal Gas Diesel Total
State 13500 180040 000 193540 000 000 000 193540
Private 86922 10800 000 97722 000 000 12157 109879
Central 311272 20701 000 331973 10283 72309 000 414565
Sub-Total 411694 211541 000 623235 10283 72309 12157 717984
State 272000 15000 000 287000 000 110282 5930 403212
Private 408078 000 000 408078 000 20000 34745 462823
Central 129472 53561 000 183034 10094 66370181 500 259998
Sub-Total 809550 68561 000 878112 10094 196652 41175 1126032
State 000 000 000 000 000 69460 25661 95121
Private 000 000 000 000 000 99200 60536 159736
Central 18340 6201 000 24541 2895 122388 000 149824
Sub-Total 18340 6201 000 24541 2895 291048 86197 404681
State 000 17500 000 17500 000 123000 12903 153403
Private 000 000 000 000 000 000 5985 5985
Central 50639 12907 000 63547 6798 109188 000 179533
Sub-Total 50639 30407 000 81047 6798 232188 18888 338921
State 176000 15000 000 191000 000 259770 12780 463550
Private 511550 000 000 511550 000 28800 115462 655812
Central 85458 26401 000 111859 19681 92342 000 223882
Sub-Total 773008 41401 000 814409 19681 380912 128242 1343244
State 585000 60380 000 645380 000 109618 2385 757383
Private 388200 000 000 388200 000 10400 710680 1109280
Central 120625 22110 000 142735 55674 73901 29400 301710
Sub-Total 1093825 82490 000 1176315 55674 193919 742465 2168373
State 546900 000 000 546900 000 72410 2510 621820
Private 871433 000 000 871433 000 84200 266691 1222324
Central 379639 54949 000 434588 28948 180253 3000 646789
Sub-Total 1797972 54949 000 1852921 28948 336863 272201 2490933
State 000 000 000 000 000 125215 6787 132002
Private 9900 45000 000 54900 000 8800 52244 115944
Central 34324 6966 000 41290 3124 47554 000 91968
Sub-Total 44224 51966 000 96190 3124 181569 59031 339914
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 3035 3035
Central 3815 1503 000 5317 801 10171 000 16289
Sub-Total 3815 1503 000 5317 801 10171 3035 19324
124953 29105 000 154058 23703 75145 000 252907
State 1593400 287920 000 1881320 000 869755 68956 2820031
Private 2276083 55800 000 2331883 000 251400 1261535 3844818
Central 1258537 234406 000 1492943 162000 849622 32900 2537465
Grand Total 5128020 578126 000 5706146 162000 1970777 1363391 9202314
Uttar Pradesh
Uttarakhand
Chandigarh
Grand TotalThermalNuclear
Hydro
(Renewable)
RES
(MNRE)
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
NORTHERN REGION
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
(As on 31102018)
Central - Unallocated
Total (Northern
Region)
Delhi
Haryana
Himachal Pradesh
Jammu amp Kashmir
Punjab
Rajasthan
State Ownership Sector
Modewise breakup
File NoCEA-CH-14-1142018-Coordination Division
(As on 31102018)
Coal Gas Diesel Total
State 000 000 000 000 000 000 005 005
Private 000 4800 000 4800 000 000 091 4891
Central 45478 1967 000 47445 2600 000 000 50045
Sub-Total 45478 6767 000 52245 2600 000 096 54941
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 1301 1301
Central 12663 4334 000 16997 700 000 000 17697
Sub-Total 12663 4334 000 16997 700 000 1301 18998
State 475000 217782 000 692782 000 77200 800 770782
Private 776567 396000 000 1172567 000 000 729782 1902349
Central 309051 42400 000 351451 55900 000 23830 431181
Sub-Total 1560618 656182 000 2216800 55900 77200 754412 3104312
State 408000 000 000 408000 000 170366 8396 586762
Private 617400 10000 000 627400 000 000 378205 1005605
Central 279441 25700 000 305141 27300 152000 30000 514441
Sub-Total 1304841 35700 000 1340541 27300 322366 416601 2106808
State 228000 000 000 228000 000 12000 1105 241105
Private 849000 000 000 849000 000 000 52430 901430
Central 195344 000 000 195344 4800 10000 000 210144
Sub-Total 1272344 000 000 1272344 4800 22000 53535 1352679
State 1017000 67200 000 1084200 000 285084 20813 1390097
Private 1245600 56800 000 1302400 000 48100 842815 2193315
Central 433475 227273 000 660748 69000 000 12300 742048
Sub-Total 2696075 351273 000 3047348 69000 333184 875927 4325459
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 546 546
Central 17444 6634 000 24078 900 000 000 24978
Sub-Total 17444 6634 000 24078 900 000 546 25524
211400 19759 000 231159 22800 000 000 253959
State 2128000 284982 000 2412982 000 544650 31119 2988751
Private 3488567 467600 000 3956167 000 48100 2005170 6009437
Central 1504295 328067 000 1832362 184000 162000 66130 2244492
Grand Total 7120862 1080649 000 8201511 184000 754750 2102418 11242679
Central - Unallocated
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
WESTERN REGION
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
State Ownership Sector
Modewise breakup
Grand TotalThermalNuclear
Hydro
(Renewable)
RES
(MNRE)
Total (Western
Region)
Goa
Daman amp Diu
Gujarat
Madhya Pradesh
Chhattisgarh
Maharashtra
Dadra amp Nagar
Naveli
File NoCEA-CH-14-1142018-Coordination Division
(As on 31102018)
Coal Gas Diesel Total
State 501000 23540 000 524540 000 167360 4875 696775
Private 387388 381318 3680 772386 000 000 693073 1465459
Central 167456 000 000 167456 12727 000 25000 205183
Sub-Total 1055844 404858 3680 1464382 12727 167360 722948 2367417
State 508250 000 000 508250 000 247993 4022 760265
Private 83945 83182 000 167127 000 000 375048 542175
Central 195612 000 000 195612 14873 000 1000 211485
Sub-Total 787807 83182 000 870989 14873 247993 380070 1513925
State 502000 000 12792 514792 000 359980 15533 890305
Private 195850 000 2520 198370 000 000 1275640 1474010
Central 282920 000 000 282920 69800 000 000 352720
Sub-Total 980770 000 15312 996082 69800 359980 1291173 2717035
State 000 000 15996 15996 000 188150 15402 219548
Private 61500 17400 000 78900 000 000 20899 99799
Central 114322 35958 000 150280 36200 000 5000 191480
Sub-Total 175822 53358 15996 245176 36200 188150 41301 510827
State 432000 52408 000 484408 000 220320 12270 716998
Private 483767 50310 41170 575247 000 000 1130984 1706231
Central 448952 000 000 448952 144800 000 18190 611942
Sub-Total 1364719 102718 41170 1508607 144800 220320 1161444 3035171
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 000 000
Central 10000 000 000 10000 000 000 000 10000
Sub-Total 10000 000 000 10000 000 000 000 10000
State 000 3250 000 3250 000 000 000 3250
Private 000 000 000 000 000 000 171 171
Central 24840 000 000 24840 8600 000 000 33440
Sub-Total 24840 3250 000 28090 8600 000 171 36861
178400 000 000 178400 45000 000 000 223400
State 1943250 79198 28788 2051236 000 1183803 52102 3287141
Private 1212450 532210 47370 1792030 000 000 3495815 5287845
Central 1422502 35958 000 1458460 332000 000 49190 1839650
Grand Total 4578202 647366 76158 5301726 332000 1183803 3597107 10414636
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
SOUTHERN REGION
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
State Ownership Sector
Modewise breakup
Grand TotalThermal RES
(MNRE)Nuclear
Hydro
(Renewable)
Kerala
Tamil Nadu
NLC
Puducherry
Central - Unallocated
Total (Southern
Region)
Andhra Pradesh
Telangana
Karnataka
File NoCEA-CH-14-1142018-Coordination Division
(As on 31102018)
Coal Gas Diesel Total
State 71000 000 000 71000 000 000 7070 78070
Private 28100 000 000 28100 000 000 25545 53645
Central 291433 000 000 291433 000 11000 000 302432
Sub-Total 390533 000 000 390533 000 11000 32615 434147
State 42000 000 000 42000 000 13000 405 55405
Private 73000 000 000 73000 000 000 3207 76207
Central 39374 000 000 39374 000 6100 000 45474
Sub-Total 154374 000 000 154374 000 19100 3612 177086
State 540000 10000 000 550000 000 98600 9195 657795
Private 242500 000 000 242500 000 000 34452 276952
Central 76077 000 000 76077 000 41000 000 117077
Sub-Total 858577 10000 000 868577 000 139600 43647 1051824
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 000 000
Central 698504 000 000 698504 000 18620 000 717124
Sub-Total 698504 000 000 698504 000 18620 000 717124
State 42000 000 000 42000 000 206192 630 248822
Private 293900 000 000 293900 000 000 21648 315548
Central 163390 000 000 163390 000 8900 1000 173290
Sub-Total 499290 000 000 499290 000 215092 23278 737660
State 000 000 000 000 000 36000 5211 41211
Private 000 000 000 000 000 39900 001 39901
Central 8703 000 000 8703 000 6400 000 15103
Sub-Total 8703 000 000 8703 000 82300 5212 96215
110183 000 000 110183 000 8501 000 118684
State 695000 10000 000 705000 000 353792 22511 1081303
Private 637500 000 000 637500 000 39900 84853 762253
Central 1387664 000 000 1387664 000 100520 1000 1489184
Grand Total 2720164 10000 000 2730164 000 494212 108364 3332740
(As on 31102018)
Coal Gas Diesel Total
State 000 32821 000 32821 000 10000 3001 45822
Private 000 2450 000 2450 000 000 1680 4130
Central 27902 43556 000 71458 000 36851 000 108309
Sub-Total 27902 78827 000 106729 000 46851 4681 158261
State 000 000 000 000 000 000 10710 10710
Private 000 000 000 000 000 000 539 539
Central 2470 4682 000 7152 000 11800 000 18952
Sub-Total 2470 4682 000 7152 000 11800 11249 30201
State 000 000 000 000 000 32200 3103 35303
Private 000 000 000 000 000 000 006 006
Central 3040 10969 000 14009 000 7446 000 21455
Sub-Total 3040 10969 000 14009 000 39646 3109 56764
State 000 16950 000 16950 000 000 1601 18551
Private 000 000 000 000 000 000 009 009
Central 3740 43695 000 47435 000 7077 500 55012
Sub-Total 3740 60645 000 64385 000 7077 2110 73572
State 000 000 3600 3600 000 000 545 4145
Private 000 000 000 000 000 000 217 217
Central 3140 7157 000 10297 000 9677 000 19974
Sub-Total 3140 7157 3600 13897 000 9677 762 24336
State 000 000 000 000 000 000 3067 3067
Private 000 000 000 000 000 000 100 100
Central 2140 4893 000 7033 000 5860 000 12893
Sub-Total 2140 4893 000 7033 000 5860 3167 16060
State 000 000 000 000 000 000 3647 3647
Private 000 000 000 000 000 000 020 020
Central 2070 4046 000 6116 000 9913 000 16029
Sub-Total 2070 4046 000 6116 000 9913 3667 19696
7500 6362 000 13862 000 14376 000 28238
State 000 49771 3600 53371 000 42200 25674 121245
Private 000 2450 000 2450 000 000 2571 5021
Central 52002 125360 000 177362 000 103000 500 280862
Grand Total 52002 177581 3600 233183 000 145200 28745 407128
Central - Unallocated
Total (Eastern
Region)
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
NORTH-EASTERN REGION
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
State Ownership Sector
Modewise breakup
Grand TotalThermalNuclear
Bihar
Jharkhand
West Bengal
DVC
Odisha
Sikkim
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
EASTERN REGION
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
Ownership Sector
Modewise breakup
Grand TotalThermalNuclear
Hydro
(Renewable)
RES
(MNRE)
Manipur
Nagaland
State
Mizoram
Central - Unallocated
Total (North-
Eastern Region)
Hydro
(Renewable)
RES
(MNRE)
Assam
Arunachal Pradesh
Meghalaya
Tripura
File NoCEA-CH-14-1142018-Coordination Division
(As on 31102018)
Coal Gas Diesel Total
State 000 000 4005 4005 000 000 525 4530
Private 000 000 000 000 000 000 146 146
Central 000 000 000 000 000 000 510 510
Sub-Total 000 000 4005 4005 000 000 1181 5186
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 075 075
Central 000 000 000 000 000 000 000 000
Sub-Total 000 000 000 000 000 000 075 075
State 000 000 4005 4005 000 000 525 4530
Private 000 000 000 000 000 000 221 221
Central 000 000 000 000 000 000 510 510
Grand Total 000 000 4005 4005 000 000 1256 5261
19
Andaman amp
Nicobar
lakshadweep
Total (Islands)
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
State Ownership Sector
Modewise breakup
Grand TotalThermalNuclear
Hydro
(Renewable)
RES
(MNRE)
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
ISLANDS
File NoCEA-CH-14-1142018-Coordination Division
SrNo Contents Page
1 Executive summary of Target and Achievement of Transmission Lines during 2018-19
20(1)
2 List of Transmission Lines CommissionedReady for commissioning during Oct-2018 20(2)
Section C - Transmission Lines
File NoCEA-CH-14-1142018-Coordination Division
Executive summary of Target and Achievement of Transmission Lines during 2018-19 As on Oct-18
(All figures in circuit kms)
Centr
al S
ecto
r
Sta
te S
ecto
r
JV
Private
Secto
r
To
tal
Centr
al S
ecto
r
Sta
te S
ecto
r
JV
Private
Secto
r
To
tal
Centr
al S
ecto
r
Sta
te S
ecto
r
JV
Private
Secto
r
To
tal
Centr
al S
ecto
r
Sta
te S
ecto
r
JV
Private
Secto
r
To
tal
Centr
al S
ecto
r
Sta
te S
ecto
r
JV
Private
Secto
r
To
tal
Cen
tral S
ecto
r
Sta
te S
ecto
r
JV
Pri
vate
Secto
r
Gra
nd
To
tal
0 0 0 0 0 0 0 0 4692 766 827 6285 3045 5906 980 9931 553 5878 0 6431 8290 12550 1807 22647
Oct18 Programme 0 0 0 0 0 0 0 0 300 0 0 300 662 90 562 1314 0 723 0 723 962 813 562 2337
Achievement 0 0 0 0 0 0 0 0 729 0 0 729 471 266 0 737 0 401 0 401 1200 667 0 1867
Upto Oct-18 Programme 0 0 0 0 0 0 0 0 3004 416 0 3420 1350 3109 562 5021 481 4346 0 4827 4835 7871 562 13268
Achievement 0 0 0 0 0 0 0 0 2286 0 178 2464 1436 1783 1595 4814 60 4461 0 4521 3782 6244 1773 11799
20(1)
220 kV Grand Total 800 kV 500 kV
Programme 2018-19
Programme
Achievement
HVDC765 kV 400 kV
File NoCEA-CH-14-1142018-Coordination Division
SlNo Line
Length
(cKM)
1 2 3 4 5 6
1 765 Jharsuguda - Dharamjaygarh line DC PGCIL 296
2 765LILO of Kurnool - Thirvualam line at
CuddapahDC PGCIL 190
3 765 Salem PS - Madhugiri PS line SC PGCIL 243
4 400 Cuddapah - Hindupur line (Q) DC PGCIL 338
5 400LILO of Both Ckt of Bamnauli - Samaypur at
TughlakabadMC PGCIL 114
6 400LILO-Out of Cuddapah - Hindupur line (Q)
(Both Ckts) at NP Kunta ssDC PGCIL 19
1200
7 400LILO of Sterlite - Meramundali at Lapanga
4oo kV ssDC OPTCL 14
8 400 Sterlite - Lapanga line DC OPTCL 37
9 400 TMDC Podili - Sattapenalli line DC APTRANSCO 215
10 230Neyveli 230110 kV ss - Eachangadu
230kV FeederSC TANTRANSCO 1
11 230 NNTPS - Neyveli 230110kV ss DC TANTRANSCO 2
12 220 Ajmer (400 kV) - Bherunda (TK) DC RVPNL 100
13 220 Aligarh - Atrauli line DC UPPTCL 77
14 220 Khandwa - Chhanera line DC MPPTCL 78
15 220LILO of one Ckt of Hadala - Sartanpar line
at Wankaner on MC towersDC GETCO 6
16 220 LILO of one Ckt of Vita - Miraj at Alkud ss DC MSETCL 27
17 220 Mendhigiri - Alkud ss DC MSETCL 110
667
1867
20(2)
Grand Total
2Transmission Lines (220 kV and above) CommissionedReady for commissioning During Oct-2018
As on 31-10-18
Voltage
Level (kV)Name of Transmission Lines
Circuit
Type
Executing
Agency
CENTRAL SECTOR
Total of CENTRAL SECTOR
STATE SECTOR Sector
Total of STATE SECTOR
File NoCEA-CH-14-1142018-Coordination Division
SN Contents Page
1 Executive summary of Target and Achievement of Substations during 2018-19 21(1)
2Sub Stations (220 kV and above) commissionedready for commisssioning during Oct-
201821(2)
Section D - Sub Stations
File NoCEA-CH-14-1142018-Coordination Division
1 Executive summary of Target and Achievement of Substations during 2018-19 As on Oct-18
(All figures in circuit MVA)
Centr
al S
ecto
r
Sta
te S
ecto
r
JV
Private
Secto
r
To
tal
Centr
al S
ecto
r
Sta
te S
ecto
r
JV
Private
Secto
r
To
tal
Centr
al S
ecto
r
Sta
te S
ecto
r
JV
Private
Secto
r
To
tal
Centr
al S
ecto
r
Sta
te S
ecto
r
JV
Private
Secto
r
To
tal
Centr
al S
ecto
r
Sta
te S
ecto
r
JV
Private
Secto
r
To
tal
Cen
tral S
ecto
r
Sta
te S
ecto
r
JV
Pri
vate
Secto
r
Gra
nd
To
tal
3000 0 0 3000 0 0 0 0 22200 0 0 22200 8185 13085 630 21900 740 14760 0 15500 34125 27845 630 62600
Oct18 Programme 0 0 0 0 0 0 0 0 0 0 0 0 1000 1260 630 2890 0 1400 0 1400 1000 2660 630 4290
Achievement 0 0 0 0 0 0 0 0 3000 0 0 3000 1500 3120 0 4620 0 2220 0 2220 4500 5340 0 9840
Upto Oct-18 Programme 0 0 0 0 0 0 0 0 10000 0 0 10000 6130 7435 630 14195 0 9670 0 9670 16130 17105 630 33865
Achievement 0 0 0 0 0 0 0 0 14000 0 0 14000 9000 7550 630 17180 0 10610 0 10610 23000 18160 630 41790
21(1)
220 kV Grand Total 800 kV 500 kV
Programme 2018-19
Programme
Achievement
HVDC765 kV 400 kV
File NoCEA-CH-14-1142018-Coordination Division
As on 31-10-18
Sl Voltage Ratio Capacity
No (kVkV) (MWMVA)
1 2 3 4 5
1 Cuddapah Ss 765400 PGCIL 3000
2 Tughlakabad SS (GIS) 400220 PGCIL 1500
Total of CENTRAL SECTOR 4500
3 Panki Kanpur (Aug) TF-I 400200 UPPTCL 75
4 Hindupur ss (1st ICT) 400220 APTRANSCO 315
5 Thappagundu ss 400110 TANTRANSCO 600
6 Mendhasal (2nd power TF) 400220 OPTCL 20
7 Jodhpur ss (New) 400220 RVPNL 315
8 Shankarpally 400220 TSTRANSCO 500
9 Podili ss (1st ICT) 400220 APTRANSCO 315
10 Doni (Gadag)SS 400220 KPTCL 1000
11 Porur (Addl TF) 230110 TANTRANSCO 100
12 Anuppankulam (Addl TF) 230110 TANTRANSCO 60
13 Neyveli SS 230110 TANTRANSCO 480
14 Savarkundla (Aug) 22066 GETCO 60
15 Bhuna (Aug) 220132 HVPNL 100
16 Madanpur (Aug) 22066 HVPNL 100
17 Gurgaon Sec-52A (Aug) 22066 HVPNL 160
18 IA Hisar (Aug) 220132 HVPNL 50
19 Narwana (Aug) 220132 HVPNL 60
20 Therubali (3rd Auto TF) 220132 OPTCL 160
21 Halasar ss 220132 RVPNL 160
22 Bansi Siddaharthnagar (Aug) TF-I 220132 UPPTCL 60
23 Hata Kushinagar (New) TF-I 220132 UPPTCL 100
24 Gomti nagar Lucknow (Aug) TF-IV 22033 UPPTCL 60
25 Kanpur Road Lucknow (New) TF-III 22033 UPPTCL 60
26 Asoj (Aug) 22066 GETCO 150
27 Kangasiyali (Aug) 22066 GETCO 60
28 Karmsad (Aug) 22066 GETCO 160
29 Lalpar (Aug) 22066 GETCO 60
TOTAL STATE SECTOR 5340
GRAND TOTAL 9840
21(2)
PRIVATE SECTOR
CENTRAL SECTOR
STATE SECTOR
2Sub-Stations (220 kV and above) CommissionedReady for commissioning During Oct-2018
Name of Sub StationsExecuting
Agency
File NoCEA-CH-14-1142018-Coordination Division
SN Contents Page
1 Electricity Generation (MU) Targets and Achievements for 2018-19 22
Section E - Electricity Generation
File NoCEA-CH-14-1142018-Coordination Division
Programme Achievement Ach Programme Achievement Ach
Central Sector 35160700 3028100 3162321 10443 20144400 21150469 10499
State Sector 35132000 3010000 3017260 10024 19922100 19549030 9813
PvtIPP Sector 36999700 3240600 3375603 10417 21598300 20794155 9628
PvtUTL Sector 1857600 164500 180597 10979 1130900 1203107 10638
Total 109150000 9443200 9735781 10310 62795700 62696761 9984
Central Sector 5617600 420900 451004 10715 4193000 4045436 9648
State Sector 6110600 559500 708469 12663 4049400 4433000 10947
PvtIPP Sector 1141800 80500 90122 11195 976400 1021963 10467
PvtUTL Sector 130000 11300 12564 11119 76700 99943 13030
Total 13000000 1072200 1262159 11772 9295500 9600342 10328
Central Sector 3850000 353300 303310 8585 2068900 2203540 10651
Total 3850000 353300 303310 8585 2068900 2203540 10651
Bhutan Import 500000 63300 35395 5592 347000 416660 12007
Central Sector 44628300 3802300 3916635 10301 26406300 27399445 10376
State Sector 41242600 3569500 3725729 10438 23971500 23982030 10004
Pvt Sector 40129100 3496900 3658886 10463 23782300 23119168 9721
Total 126500000 10932000 11336645 10370 74507100 74917303 10055
Provisional based on actual-cum-Assesment
Figs in MU
Cummulative
Achievement
Cummulative
Achievement
Sep-18 Sep-17 Upto Sep-2018 Upto Sep-2017
1073794 748889 7332680 5660929
22
Renewable Energy Generation
Achievement
Oct-2018
1 Electricity Generation (MU) Targets and Achievememts for 2018-19
All India Energy Generation During April 2018- Oct 2018 (MU)
Target (2018-19)April 2018- Oct 2018
Sector
Hydro
Thermal
Nuclear
627957
92955
20689
745071
626968
96003
22035
749173
0
100000
200000
300000
400000
500000
600000
700000
800000
Thermal Hydro Nuclear Total
Programme
Achievement
File NoCEA-CH-14-1142018-Coordination Division
SN Contents Page
1 Energy Power Supply Position (Provisional) for Oct-2018 and during April 2018- Oct 2018 23
2 Peak Power Supply Position (Provisional) for Oct-2018 and during April 2018- Oct 2018 24
3 Energy Power Supply Position (Revised) for Sep-2018 and during April 2018- Sept 2018 25
4 Peak Power Supply Position (Revised) for Sep-2018 and during April 2018- Sept 2018 26
5 Notified Power cuts Restrictions on Industries during Oct-2018 27
6 Power Supply to Agricultural Sector during Oct-2018 28
Section F - Power supply position
File NoCEA-CH-14-1142018-Coordination Division
आकड़ मममलयन यननट नट Figures in MU net
ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied
कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )
चडीगढ़ Chandigarh 108 108 0 00 1055 1055 0 00
दिलली Delhi 2490 2489 1 00 22524 22510 14 01
हरियजणज Haryana 4554 4554 0 00 35205 35205 0 00
दहमजचल परिश Himachal Pradesh 788 787 2 02 5728 5560 168 29
रमम कशमीि Jammu amp Kashmir 1497 1219 278 186 10982 8865 2117 193
परजब Punjab 4418 4418 0 00 38832 38819 13 00
िजरसथजन Rajasthan 6748 6748 0 00 45341 45181 160 04
उतति परिश Uttar Pradesh 10136 9973 164 16 75485 74808 676 09
उततिजखड Uttarakhand 1083 1081 3 03 8395 8310 85 10
उततरी कषतर Northern Region 31822 31375 447 14 243547 240314 3233 13
छततीसगढ़ Chhattisgarh 2454 2453 1 00 16119 16091 28 02
गरिजत Gujarat 11636 11636 0 00 70782 70768 14 00
मधय परिश Madhya Pradesh 5860 5859 1 00 38412 38410 2 00
महजिजषटर Maharashtra 15223 15095 128 08 95489 95355 134 01
िमन औि दिउ Daman amp Diu 216 216 0 00 1523 1523 0 00
िजिि व नगि हवली Dadra amp Nagar Haveli 553 553 0 00 3757 3757 0 00
गोवज Goa 366 366 0 00 2497 2495 2 01
पशचिमी कषतर Western Region 36308 36178 130 04 228579 228398 180 01
आनधर परिश Andhra Pradesh 5860 5854 6 01 37377 37334 43 01
तलगजनज Telangana 6748 6742 6 01 38251 38205 46 01
कनजाटक Karnataka 5842 5835 7 01 39111 39059 52 01
किल Kerala 2116 2096 20 09 14256 14160 96 07
तममल नजड Tamil Nadu 8611 8601 10 01 65742 65666 76 01
पडचिी Puducherry 216 215 1 05 1654 1646 8 05
लकष-दवीप Lakshadweep 4 4 0 0 27 27 0 0
दकषकषणी कषतर Southern Region 29392 29342 50 02 196390 196069 321 02
बबहजि Bihar 2742 2738 4 01 19143 18951 192 10
िजमोिि घजटी ननगम DVC 1712 1698 13 08 13096 12828 268 20
झजिखणड Jharkhand 701 697 4 06 5022 4949 73 15
ओडडशज Odisha 3147 3134 13 04 20224 20192 32 02
पशशचम बगजल West Bengal 4204 4200 4 01 33008 32881 127 04
मसशककम Sikkim 40 40 0 00 279 279 0 01
अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 67 202 188 13 67
परवी कषतर Eastern Region 12547 12507 40 03 90772 90080 692 08
अरणजचल परिश Arunachal Pradesh 67 66 1 09 502 496 7 13
असम Assam 833 809 24 29 6153 5903 250 41
मणणपि Manipur 72 71 1 10 485 478 7 14
मघजलय Meghalaya 147 147 0 00 1043 1042 0 00
ममज़ोिम Mizoram 63 62 1 08 365 359 5 14
नजगजलड Nagaland 76 67 8 110 540 481 59 109
बिपिज Tripura 130 129 1 09 1025 1007 19 18
उततर-परवी कषतर North-Eastern Region 1387 1351 35 25 10113 9766 346 34
समपणण भारत All India 111455 110753 702 06 769399 764627 4773 06
23
ऊराण वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Energy Power Supply Position Report (Provisional)
राजयStateअकरबर2018 October2018 अपरल2018 -अकरबर2018 April2018 to October2018
ऊरजा पनत ा म कमी ऊरजा पनत ा म कमीEnergy not Supplied
Excludes energy exported to Bangladesh
Energy not Supplied
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
File NoCEA-CH-14-1142018-Coordination Division
अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met
कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )
चडीगढ़ Chandigarh 217 217 0 00 369 369 0 00
दिलली Delhi 4713 4713 0 00 7016 7016 0 00
हरियजणज Haryana 7948 7948 0 00 10270 10270 0 00
दहमजचल परिश Himachal Pradesh 1520 1520 0 00 1520 1520 0 00
रमम कशमीि Jammu amp Kashmir 2836 2269 567 200 2951 2361 590 200
परजब Punjab 7979 7979 0 00 12638 12638 0 00
िजरसथजन Rajasthan 11450 11450 0 00 11698 11698 0 00
उतति परिश Uttar Pradesh 17434 16745 688 39 20498 20062 436 21
उततिजखड Uttarakhand 1943 1943 0 00 2143 2143 0 00
उततरी कषतर Northern Region 50659 49635 1024 20 63166 61726 1440 23
छततीसगढ़ Chhattisgarh 4414 4268 146 33 4414 4268 146 33
गरिजत Gujarat 18148 18130 19 01 18148 18130 19 01
मधय परिश Madhya Pradesh 11356 11317 39 03 11356 11317 39 03
महजिजषटर Maharashtra 23864 23159 705 30 23864 23254 610 26
िमन औि दिउ Daman amp Diu 342 341 1 02 357 356 1 02
िजिि व नगि हवली Dadra amp Nagar Haveli 784 780 4 05 816 815 1 01
गोवज Goa 536 536 0 00 596 596 0 00
पशचिमी कषतर Western Region 56548 55695 853 15 56548 55695 853 15
आनधर परिश Andhra Pradesh 9435 9435 0 00 9435 9435 0 00
तलगजनज Telangana 10603 10603 0 00 10815 10815 0 00
कनजाटक Karnataka 10741 10741 0 00 10741 10741 0 00
किल Kerala 3727 3644 83 22 4050 3997 53 13
तममल नजड Tamil Nadu 14747 14333 414 28 15029 14981 47 03
पडचिी Puducherry 363 362 1 03 420 400 19 46
लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0
दकषकषणी कषतर Southern Region 45279 45226 53 01 45946 45684 262 06
बबहजि Bihar 4945 4945 0 00 5050 5045 5 01
िजमोिि घजटी ननगम DVC 2729 2729 0 00 2874 2874 0 00
झजिखणड Jharkhand 1260 1260 0 00 1339 1284 55 41
ओडडशज Odisha 5624 5224 400 71 5624 5357 268 48
पशशचम बगजल West Bengal 8775 8775 0 00 9130 9123 7 01
मसशककम Sikkim 86 86 0 00 90 90 0 00
अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7
परवी कषतर Eastern Region 22959 22567 392 17 22959 22567 392 17
अरणजचल परिश Arunachal Pradesh 138 125 13 94 138 133 5 37
असम Assam 1785 1704 81 45 1865 1809 56 30
मणणपि Manipur 187 185 2 11 193 186 7 36
मघजलय Meghalaya 336 336 0 00 371 368 2 07
ममज़ोिम Mizoram 99 97 2 20 103 98 4 41
नजगजलड Nagaland 134 131 3 22 156 138 18 117
बिपिज Tripura 269 269 0 00 298 293 5 17
उततर-परवी कषतर North-Eastern Region 2790 2700 90 32 2967 2850 117 39
समपणण भारत All India 172945 170604 2341 14 177022 175528 1494 08
24
अधिकतम वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Peak Power Supply Position Report (Provisional)
आकड़ मगज वजट नट Figures in MW netअपरल2018 -अकरबर2018 April2018 to October2018
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
मजग की पनता म कमी Demand not Met
Excludes the supply to Bangladesh
राजयStateअकरबर2018 October2018
मजग की पनता म कमी Demand not Met
File NoCEA-CH-14-1142018-Coordination Division
आकड़ मममलयन यननट नट Figures in MU net
ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied
कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )
चडीगढ़ Chandigarh 141 141 0 00 947 947 0 00
दिलली Delhi 2925 2924 1 00 20034 20021 13 01
हरियजणज Haryana 4794 4794 0 00 30651 30651 0 00
दहमजचल परिश Himachal Pradesh 876 853 24 27 4940 4773 167 34
रमम कशमीि Jammu amp Kashmir 1520 1246 274 180 9485 7646 1839 194
परजब Punjab 5575 5575 0 00 34414 34401 13 00
िजरसथजन Rajasthan 6202 6201 0 00 38594 38434 160 04
उतति परिश Uttar Pradesh 10211 10124 86 08 65349 64836 513 08
उततिजखड Uttarakhand 1162 1149 13 11 7311 7229 82 11
उततरी कषतर Northern Region 33405 33008 398 12 211725 208939 2786 13
छततीसगढ़ Chhattisgarh 2403 2388 15 06 13665 13638 27 02
गरिजत Gujarat 10122 10122 0 00 59146 59132 14 00
मधय परिश Madhya Pradesh 5492 5491 1 00 32552 32551 1 00
महजिजषटर Maharashtra 13615 13612 3 00 80266 80260 6 00
िमन औि दिउ Daman amp Diu 221 221 0 00 1306 1306 0 00
िजिि व नगि हवली Dadra amp Nagar Haveli 551 551 0 00 3204 3204 0 00
गोवज Goa 339 339 0 00 2131 2128 2 01
पशचिमी कषतर Western Region 32742 32723 19 01 192270 192220 50 00
आनधर परिश Andhra Pradesh 5294 5287 7 01 31518 31480 37 01
तलगजनज Telangana 6279 6272 8 01 31503 31463 40 01
कनजाटक Karnataka 5701 5693 8 01 33269 33225 45 01
किल Kerala 2050 2026 24 12 12140 12063 76 06
तममल नजड Tamil Nadu 8971 8959 12 01 57131 57065 66 01
पडचिी Puducherry 226 224 2 08 1438 1431 7 05
लकष-दवीप Lakshadweep 4 4 0 0 23 23 0 0
दकषकषणी कषतर Southern Region 28520 28460 60 02 166998 166727 271 02
बबहजि Bihar 2839 2793 46 16 16400 16213 188 11
िजमोिि घजटी ननगम DVC 1901 1750 151 79 11384 11130 254 22
झजिखणड Jharkhand 740 723 17 22 4321 4252 69 16
ओडडशज Odisha 2921 2918 3 01 17077 17058 19 01
पशशचम बगजल West Bengal 4902 4879 23 05 28804 28681 123 04
मसशककम Sikkim 39 39 0 01 239 239 0 01
अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 67 173 162 12 67
परवी कषतर Eastern Region 13341 13102 240 18 78225 77573 652 08
अरणजचल परिश Arunachal Pradesh 74 73 1 10 435 429 6 14
असम Assam 950 914 36 38 5320 5094 226 43
मणणपि Manipur 70 69 1 11 414 408 6 15
मघजलय Meghalaya 150 150 0 01 896 896 0 01
ममज़ोिम Mizoram 58 57 1 12 302 297 5 16
नजगजलड Nagaland 80 72 8 104 464 414 50 108
बिपिज Tripura 192 191 1 07 895 878 17 19
उततर-परवी कषतर North-Eastern Region 1575 1527 48 31 8726 8415 311 36
समपणण भारत All India 109584 108819 765 07 657944 653873 4071 06
Energy not Supplied Energy not Supplied
ससतबर2018 September2018 अपरल2018 -ससतबर2018 April2018 to September2018
ऊरजा पनत ा म कमी ऊरजा पनत ा म कमी
Excludes energy exported to Bangladesh
राजयState
ऊराण वरवदयत आपरतण शथिरत ररपोरण (सशोधित) Energy Power Supply Position Report (Revised)
25
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
File NoCEA-CH-14-1142018-Coordination Division
अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met
कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )
चडीगढ़ Chandigarh 293 293 0 00 369 369 0 00
दिलली Delhi 5358 5358 0 00 7016 7016 0 00
हरियजणज Haryana 9008 9008 0 00 10270 10270 0 00
दहमजचल परिश Himachal Pradesh 1466 1466 0 00 1479 1479 0 00
रमम कशमीि Jammu amp Kashmir 2951 2361 590 200 2951 2361 590 200
परजब Punjab 11405 11405 0 00 12638 12638 0 00
िजरसथजन Rajasthan 10612 10612 0 00 11698 11698 0 00
उतति परिश Uttar Pradesh 18346 18121 225 12 20498 20062 436 21
उततिजखड Uttarakhand 1996 1996 0 00 2143 2143 0 00
उततरी कषतर Northern Region 56407 55649 758 13 63166 61726 1440 23
छततीसगढ़ Chhattisgarh 4404 4075 328 75 4404 4136 268 61
गरिजत Gujarat 16963 16963 0 00 17053 16963 90 05
मधय परिश Madhya Pradesh 8811 8771 41 05 8811 8775 36 04
महजिजषटर Maharashtra 22455 22349 106 05 23395 23254 141 06
िमन औि दिउ Daman amp Diu 357 356 1 02 357 356 1 02
िजिि व नगि हवली Dadra amp Nagar Haveli 816 815 1 01 816 815 1 01
गोवज Goa 596 596 0 00 596 596 0 00
पशचिमी कषतर Western Region 52933 52895 38 01 53841 52895 945 18
आनधर परिश Andhra Pradesh 9435 9416 19 02 9435 9416 19 02
तलगजनज Telangana 10815 10815 0 00 10815 10815 0 00
कनजाटक Karnataka 10103 10090 13 01 10690 10688 2 00
किल Kerala 3888 3638 251 64 4050 3997 53 13
तममल नजड Tamil Nadu 14556 14553 3 00 15029 14981 47 03
पडचिी Puducherry 390 372 17 45 420 400 19 46
लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0
दकषकषणी कषतर Southern Region 45542 45428 114 02 45946 45684 262 06
बबहजि Bihar 5050 5045 5 01 5050 5045 5 01
िजमोिि घजटी ननगम DVC 2641 2641 0 00 2874 2874 0 00
झजिखणड Jharkhand 1233 1233 0 00 1339 1284 55 41
ओडडशज Odisha 4906 4906 0 00 5357 5357 0 00
पशशचम बगजल West Bengal 8644 8639 5 01 9130 9123 7 01
मसशककम Sikkim 78 78 0 00 90 90 0 00
अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7
परवी कषतर Eastern Region 22110 22100 10 00 22470 22290 180 08
अरणजचल परिश Arunachal Pradesh 132 130 2 15 138 133 5 37
असम Assam 1865 1809 56 30 1865 1809 56 30
मणणपि Manipur 184 182 2 13 193 186 7 36
मघजलय Meghalaya 317 317 0 00 371 368 2 07
ममज़ोिम Mizoram 95 93 2 23 103 98 4 41
नजगजलड Nagaland 142 138 5 32 156 138 18 117
बिपिज Tripura 296 293 3 10 298 293 5 17
उततर-परवी कषतर North-Eastern Region 2921 2850 71 24 2967 2850 117 39
समपणण भारत All India 177022 175528 1494 08 177022 175528 1494 08
26
मजग की पनता म कमी मजग की पनता म कमी Demand not MetDemand not Met
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
Excludes the supply to Bangladesh
अधिकतम वरवदयत आपरतण शथिरत ररपोरण (सशोधित) Peak Power Supply Position Report (Revised)
आकड़ मगज वजट नट Figures in MW net
राजयStateससतबर2018 September2018 अपरल2018 -ससतबर2018 April2018 to September2018
File NoCEA-CH-14-1142018-Coordination Division
अकरबर2018 October2018अपरल2018 -अकरबर2018 April2018 to October2018
उततरी कषतर Northern Region
चडीगढ़ Chandigarh Data not received Data not received
दिलली Delhi
हरियजणज Haryana
दहमजचल परिश Himachal Pradesh
रमम कशमीि Jammu amp Kashmir Data not received Data not received
परजब Punjab
िजरसथजन Rajasthanउतति परिश Uttar Pradesh
उततिजखड Uttarakhand
पशचिमी कषतर Western Region
छततीसगढ़ Chhattisgarh
गरिजत Gujarat
मधय परिश Madhya Pradesh
महजिजषटर Maharashtra
गोवज Goa
दकषकषणी कषतर Southern Region
आनधर परिश Andhra Pradesh
तलगजनज Telangana
कनजाटक Karnataka
किल Kerala
तममल नजड Tamil Nadu
पडचिी Puducherryपरवी कषतर Eastern Region
बबहजि Bihar
झजिखणड Jharkhand
ओडडशज Odisha
पशशचम बगजल West Bengal
N
o No
tified
Cuts
N
o No
tified
Cuts
27
अकरबर 2018 म इडथरीर पर वरवदयत करौती का वरवरवरण Notified Power CutsRestrictions on Industries during October2018
राजय कषतर State Regionऊराणमाग करौती EnergyDemand Cut
No Notified Cuts No Notified Cuts
File NoCEA-CH-14-1142018-Coordination Division
अकरबर2018 October2018अपरल2018 -अकरबर2018 April2018 to October2018
उततरी कषतर Northern Region
चडीगढ़ Chandigarh Data not received Data not received
दिलली Delhi Data not received Data not received
हरियजणज Haryana 940 hrsday 0709 - 0950 hrsday
दहमजचल परिश Himachal Pradesh No cut imposed on agriculture consumers and uninterrupted
power is being supplied to agriculture sector
HPSEBL has only 2 agriculture consumers and uninterrupted
power is being supplied to agriculture sector
रमम कशमीि Jammu amp Kashmir Data not received Data not received
परजब Punjab 0507 hrsday 0349 - 0844 hrsday
िजरसथजन Rajasthan 0630 hrsday 0630 hrsday
उतति परिश Uttar Pradesh 1825 hrsday 1814 - 1858 hrsday
उततिजखड Uttarakhand 2350 hrsday 2128 - 2357 hrsday
पशचिमी कषतर Western Region
छततीसगढ़ Chhattisgarh 18hoursday 18 hrsday
गरिजत Gujarat 805 hrsday 805 hrsday
मधय परिश Madhya Pradesh Three-Phase Supply(Irrigation)-947 hrs day
Three-Phase (Mixed) Supply - 2311 hrs day
Three-Phase Supply(Irrigation)- 0933 - 0947 hrs day Three-
Phase (Mixed) Supply - 2300 - 2320 hrs day
महजिजषटर Maharashtra Three-Phase Supply(Irrigation)- 9 hrs day
Three-Phase (Mixed) Supply - 24 hrs day
Three-Phase Supply(Irrigation)- 9 hrs day
Three-Phase (Mixed) Supply - 24 hrs day
गोवज Goa No restriction No restriction
दकषकषणी कषतर Southern Region
आनधर परिश Andhra Pradesh 07 hrsday 07 hrsday
तलगजनज Telangana 24 hoursday 24 hoursday
कनजाटक Karnataka 6 hrsday 6 hrsday
किल Kerala No Restrictions No Restrictions
तममल नजड Tamil Nadu 9 hrsday (6 hrs during day time and 3 hrs during night time) 9 hrsday (6 hrs during day time and 3 hrs during night time)
पडचिी Puducherry No Restrictions No Restrictions
परवी कषतर Eastern Region
बबहजि Bihar About 18 hrsday About 18 hrsday
झजिखणड Jharkhand About 20 hrsday About 20 hrsday
ओडडशज Odisha 24 hrsday 24 hrsday
पशशचम बगजल West Bengal About 23 hrsday About 23 hrsday
28
अकटबर 2018 कषि कषतर को षिदयत आपरति का षििरण Power Supply to Agricultural Sector during October2018
राजय कषतर State Regionऔसत वरवदयत आपरतण घनरो म Average Hours of Supply
On segregated feeders
File NoCEA-CH-14-1142018-Coordination Division
SNo Contents Page
1 Growth of Installed Capacity since 6th Plan 29
2 Progress of Transmission Sector since 6th Plan 30
3 All India Yearly Coal consumption for Power Generation (Utilities)
4 All India Annual Per Capita Consumption of Electricity since -2006
5 Average cost of power supply amp Average realisation (Paisakwh)
6 Growth of Rural Electrification amp Pump Sets Energisation
7 Status of Hydro Schemes Cleared by the CEA in Oct-2018
Section G - Growth of Power Sector
31
32
File NoCEA-CH-14-1142018-Coordination Division
(In MW)
Coal Gas Diesel Total
End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472
End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634
End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537
End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596
End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921
End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703
End of 12th Plan 19216288 2532938 83763 21832988 6780 4447842 50018 31960630
Up to Oct-2018 19599250 2493722 837629 22176734 6780 4548742 7201281 34604757
Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-17) = 51529 MW
Electricity Generation (MU) Targets and Achievements for 2016-17
Coal Gas Diesel Nuclear Hydro Res Total
1959925 2493722 837629 678000 454874 72012805 22925174
29
1 Growth of Installed Capacity Since 6th Plan
Plan YearThermal
Nuclear Hydro RES (MNRE) Total
Total Installed Capacity 34604757 MW
Coal Gas Diesel Nuclear Hydro Res
File NoCEA-CH-14-1142018-Coordination Division
Progress of Transmission Sector in the Country up to Oct 2018
1 TRANSMISSION LINES (All fig in CKM)
At the end of
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
6th plan 0 0 0 0 0 0 0 0 0 0 0 0 1831 4198 0 6029 1641 44364 0 46005 3472 48562 0 52034
7th plan 0 0 0 0 0 0 0 0 0 0 0 0 13068 6756 0 19824 4560 55071 0 59631 17628 61827 0 79455
8th plan 0 0 0 0 1634 0 0 1634 0 0 0 0 23001 13141 0 36142 6564 73036 0 79600 31199 86177 0 117376
9th plan 0 0 0 0 3234 1504 0 4738 751 409 0 1160 29345 20033 0 49378 8687 88306 0 96993 42017 110252 0 152269
10th plan 0 0 0 0 4368 1504 0 5872 1775 409 0 2184 48708 24730 0 73438 9444 105185 0 114629 64295 131828 0 196123
11th Plan 0 0 0 0 5948 1504 1980 9432 4839 411 0 5250 71023 30191 5605 106819 10140 125010 830 135980 91950 157116 8415 257481
12th Plan 6124 0 0 6124 5948 1504 1980 9432 25465 1177 4598 31240 92482 48240 17065 157787 11014 151276 978 163268 141033 202197 24621 367851
13th Plan (Up
to Mar2018)6124 0 0 6124 5948 1504 1980 9432 28666 1512 4881 35059 98247 54286 19067 171600 11258 156497 1000 168755 150243 213799 26928 390970
13th Plan (Up
to Sep-18)6124 0 0 6124 5948 1504 1980 9432 30952 1512 5059 37523 99683 56069 20662 176414 11318 160958 1000 173276 154025 220043 28701 402769
27150
75050
47900
118050
90650
30
IR addition in 12th Plan (up to
March 2017)
Total IR (up to Oct-18)
IR at the end of 11th Plan
IR at the end of 12th Plan
Envisaged IR Capacity at the end
of 13th Plan
Grand Total
Note - The figure upto the end of 10th plan in for stringing progress including the lines not commissioned Now only commissioned lines are reckoned Accordingly the figure for 10th plan (end) may read as 187555 after adjusting with (-) 10852 Ckm
Inter-regional Power Transfer Capacity
plusmn 800 kV HVDC plusmn 500 kV HVDC 765 kV 400 kV 220 kV
File NoCEA-CH-14-1142018-Coordination Division
2004-05 27800
2005-06 28100
2006-07 30200
2007-08 33000
2008-09 35500
2009-10 36700
2010-11 38700
2011-12 41756
2012-13 45460
2013-14 48940
2014-15 53040
2015-16 54590
2016-17 57430
2017-18 60800
Year
2005-06
2006-07
2007-08
2008-09
2009-10
2010-11
2011-12
2012-13
2013-14
2014-15
2015-16
2016-17
2017-18
2004-05 254 209 7568
2005-06 260 221 7636
2006-07 276 227 7423
2007-08 293 239 7727
2008-09 340 263 8713
2009-10 355 268 8870
2010-11 398 303 11975
2011-12 455 330 13514
2012-13 501 376 14867
2013-14 518 175
2014-15 520
6719
7171
3 All India yearly Coal Consumption for Power Generation (Utilities)
YEARCoal Consumption
Million Tonnes
4 All India Annual per Capita consumption of Electricity Since 2006
Per Capita Consumption ( kWh)
6314
(GrossGen+ Net Import) Mid-year population
5 Average cost of power supply amp average realization ( paiseKWH )
Yearcost of supply
(paiseunit)
Realization(paiseunit)
Including AgricultureOnly
Agriculture
1149
7335
7786
91441
8188
88363
957
1010
1075
1122
File NoCEA-CH-14-1142018-Coordination Division
Source- PFC Reports on the performance of State Power Utilities 31
File NoCEA-CH-14-1142018-Coordination Division
Sl
NoExecuting Agency
Installed
Capacity (MW)Cost (Rs crore)
Date of
Clearance
32
No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification
since 2004-05
65291374575 296361511th Plan
Cumu upto End of 11th Plan
596556 21212860
557439Cummulative up to end of 12th Plan
46708
18423975
499150
2003-042004-05
5743
9769
Cumu upto End of 10th Plan
010407 to 310308
010410 to 310311557976840909
010411 to 310312
412667
86293726
3207
482864
12632
1576036
4451722594
15455554
2314176
397343611750
2093311060316074
65109527813884
6 Growth Of Rural Electrification amp Pumpsets Energisation
Plan Year
9th Plan2002-03
134092626
4111
Pump Sets Energised Villages Electricfied (Nos)
2001-02
284064367244
1218
27801997-981998-991999-002000-01
297594
010408 to 310309010409 to 310310
10th Plan
2005-062006-07
322968331020
Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as
Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received
from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made
available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified
villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is
independent of the earlier published reports
No Hydro Electric Project has been issued concurrenceAppraisal letter by CEA during October 2018
7 Status of Hydro Schemes Cleared by the CEA in Oct-2018
Name of Scheme
File NoCEA-CH-14-1142018-Coordination Division
SN Contents Page
1 Rate of sale of power for the year 2016-17 33-41
RATE OF SALE OF POWER FOR THE YEAR 2016-17
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) NORTHERN REGION
CENTRAL SECTOR
BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 18000 66900 19800
CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 54000 222400 21600
CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 30000 144400 19600
CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 23100 91700 42600
PARBATI - III HPS NHPC LTD HYDRO-HYDRO 52000 68200 54800
DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 28000 95600 30000
CHUTAK NHPC LTD HYDRO-HYDRO 4400 22000 79800
DULHASTI HPS NHPC LTD HYDRO-HYDRO 39000 228000 56400
SALAL HPS NHPC LTD HYDRO-HYDRO 69000 342300 11000
TANAKPUR HPS NHPC LTD HYDRO-HYDRO 9420 43000 29600
URI HPS -I NHPC LTD HYDRO-HYDRO 48000 280300 16000
URI HPS - II NHPC LTD HYDRO-HYDRO 24000 147300 48600
NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 4500 24600 88200
SEWA - II NHPC LTD HYDRO-HYDRO 12000 47100 43400
ANTA CCPP NTPC LTD THERMAL-GASN 41930 67539 32400
AURAIYA CCPP NTPC LTD THERMAL-GASN 66336 53501 39100
BADARPUR TPS NTPC LTD THERMAL-COAL 70500 159153 44800
DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 84000 296170 42300
DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 98000 526686 46300
DADRI CCPP NTPC LTD THERMAL-GASHSD 82978 227469 33000
FARIDABAD CCPP NTPC LTD THERMAL-GASN 43159 115577 30800
RIHAND STPS I NTPC LTD THERMAL-COAL 100000 596766 24500
RIHAND STPS II NTPC LTD THERMAL-COAL 100000 737069 24600
RIHAND STPS III NTPC LTD THERMAL-COAL 100000 706546 30600
SINGRAULI STPS NTPC LTD THERMAL-COAL 200000 1394068 20400
TANDA TPS NTPC LTD THERMAL-COAL 44000 295438 40800
UNCHAHAR TPS I NTPC LTD THERMAL-COAL 42000 256454 39800
UNCHAHAR TPS II NTPC LTD THERMAL-COAL 42000 273577 38900
UNCHAHAR TPS III NTPC LTD THERMAL-COAL 21000 142780 43000
KOLDAM NTPC LTD HYDRO-HYDRO 80000 363260 43600
NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 303575 25841
RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 108000 668677 35374
NJHPS SJVNL HYDRO-HYDRO 150000 699496 23820
RAMPUR HPS SJVNL HYDRO-HYDRO 41202 195982 32260
TEHRI HPP THDC HYDRO-HYDRO 100000 272543 51800
KOTESHWAR HEP THDC HYDRO-HYDRO 40000 106244 53400
IGSTPS JHAJJAR ARAVALI P CPL THERMAL-COAL 150000 510429 49490
NEYVELI BARSINGSAR NEYVELI LIG CORP LTD THERMAL-LIG 25000 127520 38040
STATE SECTOR
PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 21000 14222 48200
PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 21000 19205 48400
PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 25000 102257 42600
PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 25000 62107 41800
DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 60000 312213 41000
RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 120000 35767442200
WYC HYDEL STATION HPGCL HYDRO-HYDRO 6240 20365 24900
GIRI POWER HOUSE HPSEB HYDRO-HYDRO 6000 13958 7600
ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 1695 5467 11900
BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 12000 18528 6700
GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 2250 7462 22500
BASSI POWER HOUSE HPSEB HYDRO-HYDRO 6600 29649 7500
BINWA POWER HOUSE HPSEB HYDRO-HYDRO 600 2749 19300
ANNEXURE-I
RATE OF SALE OF POWER FOR THE YEAR 2016-2017
Page 33
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) GAJ POWER HOUSE HPSEB HYDRO-HYDRO 1050 2914 26700
BANER POWER HOUSE HPSEB HYDRO-HYDRO 1200 2864 16200
HOLI POWER HOUSE HPSEB HYDRO-HYDRO 300 616 22500
THIROT POWER HOUSE HPSEB HYDRO-HYDRO 450 1126 22500
KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 1200 3064 22500
LARJI POWER HOUSE HPSEB HYDRO-HYDRO 12600 53677 23700
NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 250 750 31000
CHABA POWER HOUSE HPSEB HYDRO-HYDRO 175 465 23300
RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 150 101 13400
SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 200 000 22500
KILLAR HPSEB HYDRO-HYDRO 030 050 22500
BHABA AUGUMENP H HPSEB HYDRO-HYDRO 450 1276 22500
BS CHAMBA HPSEB HYDRO-HYDRO 045 099 19500
GUMMA HPSEB HYDRO-HYDRO 300 423 22500
GAS TURBINE POWER STATION IPGCL THERMAL-GAS 27000 67233 39300
PPS-I PPCL THERMAL-GAS 33000 175905 38300
PPS-III PPCL THERMAL-GAS 137120 196879 36100
LOWER JHELUM JampKPDD HYDRO-HYDRO 10500 60214 5100
UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 2260 10514 6300
UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 10500 44202 8500
GANDHARBAL JampKPDD HYDRO-HYDRO 1500 8925 4700
KARNAH MPH JampKPDD HYDRO-HYDRO 200 1122 31000
CHENANI I JampKPDD HYDRO-HYDRO 2330 10892 6600
CHENANI II JampKPDD HYDRO-HYDRO 200 1188 9300
CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 750 3634 14200
IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 375 2108 18500
IGO MERCHELLONG JampKPDD HYDRO-HYDRO 300 1572 29700
PAHALGAM MHP JampKPDD HYDRO-HYDRO 450 1713 32900
MARPACHOO JampKPDD HYDRO-HYDRO 075 375 29800
HAFTAL JampKPDD HYDRO-HYDRO 100 483 28700
SANJAK JampKPDD HYDRO-HYDRO 126 441 36000
SEWA-III JampKPDD HYDRO-HYDRO 900 3273 20200
BHADERWAH JampKPDD HYDRO-HYDRO 150 935 8900
BAZGO JampKPDD HYDRO-HYDRO 030 108 33300
SUMOOR JampKPDD HYDRO-HYDRO 010 045 35400
HUNDER JampKPDD HYDRO-HYDRO 040 176 26200
STAKNA JampKPDD HYDRO-HYDRO 400 1933 4100
KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 124000 662879 31360
SURATGARH TPS RRVUNL THERMAL-COAL 150000 402328 41730
CHHABRA TPS 1amp 2 RRVUNL THERMAL-COAL 50000 305946 36700
CHHABRA TPS 3 RRVUNL THERMAL-COAL 25000 151536 36700
CHHABRA TPS 4 RRVUNL THERMAL-COAL 25000 155896 36700
RAMGARH GT POWER PROJECT RRVUNL THERMAL-COAL 22050 43177 41800
RAMGARH GAS T P PROJECT 3 RRVUNL THERMAL-GAS 5000 93615 41800
DHOLPUR C C POWER PROJECT RRVUNL THERMAL-R-LNG 33000 9486 46110
MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 14000 20855 34192
MINI MICRO HYDEL (MMH) P S RRVUNL HYDRO-HYDRO 2385 851 37800
KALISINDH TPP 1 RRVUNL THERMAL-COAL 60000 341543 45000
KALISINDH TPP 2 RRVUNL THERMAL-COAL 60000 211588 45000
KHARA HEP UPJVNL HYDRO-HYDRO 7200 26654 7200
MATATILLA HEP UPJVNL HYDRO-HYDRO 3060 12219 6500
OBRA HEP UPJVNL HYDRO-HYDRO 9900 21517 6300
RIHAND UPJVNL HYDRO-HYDRO 30000 57369 5500
ANPARA A TPS UPRVUNL THERMAL-COAL 63000 317536 27000
ANPARA B TPS UPRVUNL THERMAL-COAL 100000 705605 22700
ANPARA D UPRVUNL THERMAL-COAL 100000 300158 39800
HARDUAGANJ TPS UPRVUNL THERMAL-COAL 16500 45817 49200
HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 50000 304389 46600
OBRA A TPS UPRVUNL THERMAL-COAL 28800 13158 34000
OBRA B TPS UPRVUNL THERMAL-COAL 100000 328124 21900
Page 34
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) PANKI TPS UPRVUNL THERMAL-COAL 21000 66488 50300
PARICHHA TPS UPRVUNL THERMAL-COAL 22000 38762 49400
PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 42000 231931 45600
PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 50000 276722 50400
CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 24000 70845 8290
CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 14400 75366 8390
DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 3375 9595 12080
DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 5100 18701 10520
KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4140 17359 12330
KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 12000 33001 9420
KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 3000 11953 8320
TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 9000 33983 12460
MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 30400 124510 16110
RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 19800 17897 10550
MPUR UTTARAKHAND JVNL HYDRO-HYDRO 930 5121 19200
PATHRI UTTARAKHAND JVNL HYDRO-HYDRO 2040 11636 14200
GALOGI UTTARAKHAND JVNL HYDRO-HYDRO 300 648 12500
PRIVATE SECTOR
MGTPP CLP INDIA PVT LTD THERMAL-COAL 132000 268902 41940
SHRINAGAR HEP ALAKNANDA HPCL HYDRO-HYDRO 33000 127414 48800
GAMA INFRAPROP CCPP GAMA INFRAPROP PVT THERMAL-GAS 22500 52686 47000
PPGCL (BARA) JP POWER VENTURES LTD THERMAL-COAL 198000 448200 38500
MALANA HEP MALANA PCL HYDRO-HYDRO 8600 26354 29792
MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 10000 30369 32580
ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 19200 56347 36079
KASHANG HEP H P PCL HYDRO-HYDRO 19500 5034 29200
BASPA-II HEP HBPCL HYDRO-HYDRO 30000 132769 13600
KARCHAM WANGTOO HEP HBPCL HYDRO-HYDRO 100000 434386 36600
RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 108000 582600 43700
RITHALA COMBI CY POWER PLANT TATA POWER DDL THERMAL-GAS 9480 000 11900
RAJPURA TPS NABHA POWER LTD THERMAL-GAS 140000 901484 39000
TALWANDI SABO POWER LTD TALWANDI SABO POWER LTD THERMAL-COAL 198000 636040 49548
ROJA THERMAL POWER STATION ROJA POWER SCL THERMAL-COAL 120000 727200 43400
KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 34400 63400
BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 36000 62600
MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 38200 60800
UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 37900 61500
KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 42300 58800
LALITPUR PGCL BAJAJ ENERGY PVT LTD THERMAL-COAL 198000 359400 47300
PRAYAGRAJ PGCL PRAYAGRAJ PGCL THERMAL-COAL 132000 448200 38595
KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 132000 783182 33438
WESTERN REGION
CENTRAL SECTOR
INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 100000 325333 23892
OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 52000 141663 34001
GANDHAR CCPP NTPC LTD THERMAL-GAS 65739 221924 28700
KAWAS CCPP NTPC LTD THERMAL-GASN 65620 167929 27000
KORBA I amp II NTPC LTD THERMAL-COAL 210000 1499171 20500
KORBA III NTPC LTD THERMAL-COAL 50000 358746 26600
SIPAT STPS I NTPC LTD THERMAL-COAL 198000 1479902 26800
SIPAT STPS II NTPC LTD THERMAL-COAL 100000 766549 26500
VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 126000 693142 25800
VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 100000 608781 23800
VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 100000 673475 27600
VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 100000 655924 32900
VINDHYACHAL STPS V NTPC LTD THERMAL-COAL 50000 328265 31700
MOUDA I NTPC LTD THERMAL-COAL 100000 343130 44500
MOUDA Ii NTPC LTD THERMAL-COAL 66000 40637 39900
RATNAGIRI GAS amp POWER PVT LTD RGPPL THERMAL-GAS 196708 442485 47000
KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 000 24729
TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 32000 201227 10740
Page 35
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 365122 19069
TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 787444 29324
STATE SECTOR
GSEG-HAZIRA15610 MW GUJARAT S ENEGEN LTD THERMAL-GAS 15610 1805 28200
GSEG-HAZIRA35143 MW GUJARAT S ENEGEN LTD THERMAL-GAS 35130 22276 51300
GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 21978 51800
AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 13929 26100
KORBA TPS EAST CSPGCL THERMAL-COAL 44000 198673 33880
DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 365808 27570
KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 316500 30420
HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 532878 19410
CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 515 58300
MTTPS CHAMPA U-I CSPGCL THERMAL-COAL 50000 220376 39000
MTTPS CHAMPA U-II CSPGCL THERMAL-COAL 50000 23709 10000
SHP GANGREL CSPGCL HYDRO-HYDRO 1000 2350 36790
BANGO HEP CSPGCL HYDRO-HYDRO 12000 14662 8900
MHP KORBA WEST CSPGCL HYDRO-HYDRO 170 859 38190
SIKASAR HEP CSPGCL HYDRO-HYDRO 700 418 26870
DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8843 74500
DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 19446 51500
GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 66388 71600
GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127488 41300
KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 96072 43900
KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 29841 56400
SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 184966 58800
UKAI 1-5 GSECL THERMAL-COAL 85000 204891 46900
UKAI TPS 6 GSECL THERMAL-COAL 50000 284448 48200
WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 271999 58300
WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 82808 44100
KADANA HPS GSECL HYDRO-HYDRO 24200 34433 16800
UKAI HPS GSECL HYDRO-HYDRO 30500 40585 6100
TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 123000 11500
BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 8900 10900
BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 7200 27500
JHINNA HPS MPPGCL HYDRO-HYDRO 2000 9700 18500
RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 44300 3400
GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 17300 4600
SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 4100 16900
MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 14600 27000
PENCH HPS MPPGCL HYDRO-HYDRO 16000 23700 8100
RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 3000 16900
AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 134400 35100
SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 283800 38700
SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 344600 34300
SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 111600 61600
SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 211800 58000
SSTPS PH-I MPPGCL THERMAL-COAL 120000 233100 84300
BHUSAWAL TPS MSPGCL THERMAL-COAL 142000 566258 51100
CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1365682 33700
KHAPERKHEDA MSPGCL THERMAL-COAL 134000 706207 39100
KORADI TPS MSPGCL THERMAL-COAL 62000 443206 42000
NASIK TPS MSPGCL THERMAL-COAL 63000 297275 47000
PARLI TPS MSPGCL THERMAL-COAL 113000 175934 71600
PARAS MSPGCL THERMAL-COAL 50000 267931 38700
URAN CCPP MSPGCL THERMAL-GAS 67200 320330 30600
KOYANA MSPGCL HYDRO-HYDRO 195600 328155 13100
SMALL HYDRO POWER PLANTS MSPGCL HYDRO-HYDRO 45400 93062 30500
BHIRA MSPGCL HYDRO-HYDRO 8000 10046 8400
TILLARI MSPGCL HYDRO-HYDRO 8900 10584 3100
SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 233298 20500
SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 87633 20500
PRIVATE SECTOR
Page 36
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 81282 46750
JNSTPP(JAYPEE NIGRIE) JP POWER VENTURES LTD THERMAL-COAL 132000 726695 29310
MB POWER MB POWER THERMAL-COAL 120000 345632 38310
ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 754922 28671
ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 780761 23495
ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 198000 1263784 32090
ADANI POWER MAHARA ADANI POWER LTD THERMAL-COAL 330000 1666191 34124
AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 170065 36827
SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 252035 45129
ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 458551 36000
ESSAR POWER MP LTD ESSAR POWER MP LTD THERMAL-COAL 60000 243040 28600
VEDANTA LTD (P P -I) VEDANTA LTD THERMAL-GAS 3000 15044 24000
VEDANTA LTD (P P -II) VEDANTA LTD THERMAL-GAS 3000 21293 24000
PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 8234600 24000
165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 5850 64390
145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 68717 40349
SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 132655 28776
SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 144686 38567
MUNDRA UMPPCOASTAL GUJARAT POWER
LTD THERMAL-IMP COAL 400000 2530300
23900
LANCO AMARKANTAK TPP PATHADIH
U-ILANCO AMARKAN POWER LTD THERMAL-COAL 30000 195500
29200
LANCO AMARKANTAK TPP PATHADIH
U-IILANCO AMARKAN POWER LTD THERMAL-COAL 30000 206900
27600
BARADARHA TPS D B POWER LTD THERMAL-COAL 120000 677373 29200
JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 405000 28900
JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 453000 40500
DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 339437 40700
TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 293400 44000
TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 137200 37000
TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 174900 44000
BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 92900 14100
BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23700 34300
KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 27600 48300
CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2530300 23900
BHANDARDRA HEP -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 2475 54900
SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 161400 26500
SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 445000 39000
SOTHERN REGION
CENTRAL SECTOR
NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 325699 54820
NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 305532 39880
NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 998805 38510
NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 113016 54070
NEYVELI TAMILNADU POWER LTD JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 625274 42200
VALLUR TPS NTPC TECL THERMAL-COAL 150000 856438 42350
R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 1493 84300
RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1502919 29400
RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 341291 31800
SIMHADRI I NTPC LTD THERMAL-COAL 100000 688382 36800
SIMHADRI II NTPC LTD THERMAL-COAL 100000 663657 43400
KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 593110 31324
MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 291625 21764
KKNPP-1 amp 2 NPCIL NUCLEAR-NUCLEAR 200000 572609 40948
MINICOY LAKSHADEEP THERMAL-DIESEL 340 770 29600
KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1097 29600
AMINI LAKSHADEEP THERMAL-DIESEL 265 509 29600
ANDROTT LAKSHADEEP THERMAL-DIESEL 219 524 29600
KALPENI LAKSHADEEP THERMAL-DIESEL 175 356 29600
AGATTI LAKSHADEEP THERMAL-DIESEL 195 658 29600
KADMAT LAKSHADEEP THERMAL-DIESEL 190 414 29600
KILTAN LAKSHADEEP THERMAL-DIESEL 150 269 29600
CHETLET LAKSHADEEP THERMAL-DIESEL 100 139 29600
BITRA LAKSHADEEP THERMAL-DIESEL 043 024 29600
BANGARAM LAKSHADEEP THERMAL-DIESEL 018 009 29600
Page 37
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) STATE SECTOR
Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 721811 46500
Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 50000 336142 46500
RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 237358 46500
RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 239926 46500
RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 124500 46500
SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 62109 46500
UPPER SILERU APGENCO HYDRO-HYDRO 24000 33000 46500
LOWER SILERU APGENCO HYDRO-HYDRO 46000 81066 46500
DONKARAI APGENCO HYDRO-HYDRO 2500 6007 46500
PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 1262 46500
CHETTIPETA APGENCO HYDRO-HYDRO 100 214 46500
MUCHKUND APGENCO HYDRO-HYDRO 12000 37571 46500
NAGARJUNASAGAR RCPH APGENCO HYDRO-HYDRO 9000 606 46500
TUNGABHADRA HES amp HAMPI(AP
Share)
APGENCO HYDRO-HYDRO 7200 6100 46500
KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 352232 42600
KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 288131 32500
KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 319272 46500
RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 40073 44300
KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 308317 46000
KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 308963 51300
SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 61004 76600
NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 17960 75300
PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 20873 58300
POCHAMPAD-I TSPGENCO HYDRO-HYDRO 2700 5455 29800
POCHAMPAD-II TSPGENCO HYDRO-HYDRO 900 1932 40700
NIZAMSAGAR TSPGENCO HYDRO-HYDRO 1000 1126 53400
RAICHUR TPS 1 to 7 KPCL THERMAL-COAL 147000 890866 43800
RAICHUR TPS 8 KPCL THERMAL-COAL 25000 159523 48200
BELLARI TPS 1 KPCL THERMAL-COAL 50000 318679 51100
BELLARI TPS 2 KPCL THERMAL-COAL 50000 232347 55600
BELLARI TPS 3 KPCL THERMAL-COAL 70000 47565 34400
BHADRA PH KPCL HYDRO-HYDRO 3920 2369 45900
GERUSUPPA PH KPCL HYDRO-HYDRO 24000 26990 22000
GHAT PRABHA HEP KPCL HYDRO-HYDRO 3200 4777 25300
KADRA HPS KPCL HYDRO-HYDRO 15000 16889 26800
NAGJHARI KPCL HYDRO-HYDRO 90000 155159 9800
KODASALLI DPH KPCL HYDRO-HYDRO 12000 14854 19200
MUNIRA+MGH+SPH+SPH KPCL HYDRO-HYDRO 22640 48211 7900
SHARAVATHY HPS KPCL HYDRO-HYDRO 108550 276215 5400
ALMATTI DPH KPCL HYDRO-HYDRO 29000 39611 24600
VARAHI UGPH KPCL HYDRO-HYDRO 46000 71368 15600
IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 17196 15300
IDUKKI HPS KSEB HYDRO-HYDRO 78000 137905 15300
KAKKAD HPS KSEB HYDRO-HYDRO 5000 13063 15300
KALLADA HPS KSEB HYDRO-HYDRO 1500 4436 15300
KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 46544 15300
KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 635 15300
LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 30822 15300
MALANKARA HPS KSEB HYDRO-HYDRO 1050 2474 15300
MATTUPETTY KSEB HYDRO-HYDRO 200 230 15300
MALAMPUZHA KSEB HYDRO-HYDRO 250 063 15300
CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 864 15300
URUMI ST I amp II KSEB HYDRO-HYDRO 615 903 15300
LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 248 15300
NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7765 19625 15300
PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 16601 15300
PANNIAR HPS KSEB HYDRO-HYDRO 3240 6217 15300
PORINGALKUTHU KSEB HYDRO-HYDRO 3600 10052 15300
PORINGALKUTHU LBE KSEB HYDRO-HYDRO 1600 9438 15300
PEPPARA KSEB HYDRO-HYDRO 300 395 15300
POOZHITHODE KSEB HYDRO-HYDRO 480 1045 15300
Page 38
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) PEECHI KSEB HYDRO-HYDRO 125 040 15300
RANI-PERUNADU KSEB HYDRO-HYDRO 400 585 15300
SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 79783 15300
SENGULAM HPS KSEB HYDRO-HYDRO 5120 11558 15300
SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 16711 15300
VILANGAD KSEB HYDRO-HYDRO 750 1578 15300
BARAPOLE KSEB HYDRO-HYDRO 1500 1932 15300
VELLATHOOVAL KSEB HYDRO-HYDRO 360 305 15300
CHIM0NY KSEB HYDRO-HYDRO 250 156 15300
ADYANPARA KSEB HYDRO-HYDRO 350 501 15300
BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 554 15300
KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 3801 15300
KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 23132 32800
ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 14416 62280
METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 523970 62280
METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 321270 62280
NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 336575 62280
NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 591240 62280
TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 508966 62280
KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 30897 62280
VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 18720 90699 62280
KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 33593 62280
BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 1047 62280
PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 1250 62280
PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 330 62280
MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 4897 62280
MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 032 62280
KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15681 62280
KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 40608 62280
KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 21342 62280
KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 4717 62280
KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4322 62280
KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2399 62280
METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 4416 62280
METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 8035 62280
BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2187 62280
BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2359 62280
BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2511 62280
BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 1949 62280
BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 1819 62280
POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 172 62280
SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 241 62280
MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 026 62280
THIRUMOORTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 136 62280
PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 9309 62280
VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 353 62280
SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 4192 62280
PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 6571 62280
SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 1186 62280
SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6319 62280
ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 6122 62280
KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 28674 62280
SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 18381 62280
SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 4258 62280
KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 12680 62280
KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4201 62280
ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 000 62280
PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 19175 62280
AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 078 62280
BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 504 62280
BHAVANI KATTALAI (BKB)(IIIampIII BB I amp II)TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 5847 62280
PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 000 62280
Page 39
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) SRI DAMODARAM STPS APPDCL THERMAL-COAL 160000 808108 36300
PRIVATE SECTOR
KARUPPUR TANJORE LANCO TANJORE PCL THERMAL-GAS 12000 48096 28770
SIMHAPURI ENERGY LTD SIMHAPURI ENERGY LTD THERMAL-COAL 60000 143900 39100
JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 7111 45500
SBU 1 JSW ENERGY LTD
VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 26000 159100
43300
SBU 2 JSW ENERGY LTD
VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 60000 247900
42800
LANCO KPLLANCO KONDAPALLI POWER
LTDTHERMAL-GAS 36814 85060
25776
LANCO KPL STG -IILANCO KONDAPALLI POWER
LTDTHERMAL-GAS 36600 12979
46330
LANCO KPL STG -IIIALANCO KONDAPALLI POWER
LTDTHERMAL-GAS 37100 85710
46330
LANCO KPL STG -III BLANCO KONDAPALLI POWER
LTDTHERMAL-GAS 37100 43639
46330
HINDUJA NATIONAL PCL HINDUJA NATIONAL PCL THERMAL-COAL 104000 303000 38200
MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 121164 49940
UDUPI POWER COR LTD ADANI POWER LTD THERMAL-COAL 120000 754613 42500
SPECTRUM POWER GENERATION
LTD SPECTRUM PG LTD THERMAL-GASN 20525 9256812
34952
TAQA NEYVELI POWER COM PVT
LTD TAQA NEYVELI THERMAL-LIG 25000 5840
34500
ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 251000 51000
ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 207860 36800
GMR VEMAGIRI POWER GENERATION
LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 30117
46450
EASTERN REGION
CENTRAL SECTOR
MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 64675 53113
MTPS STAGE - II KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 39000 1432 69138
BOKARO `B` TPS DVC THERMAL-COAL 63000 145670 31539
MEJIA TPS U 1-3 DVC THERMAL-COAL 63000 348298 31552
MEJIA TPS U 4 DVC THERMAL-COAL 21000 116099 34997
MEJIA TPS U 5-6 DVC THERMAL-COAL 50000 276427 35976
MEJIA TPS U 7-8 DVC THERMAL-COAL 100000 552854 36991
DURGAPUR STEEL TPS DVC THERMAL-COAL 100000 665550 39323
DURGAPUR TPS DVC THERMAL-COAL 21000 59270 35416
RAGHUNATHPUR TPS DVC THERMAL-COAL 120000 201650 35326
MAITHON HYDEL STA DVC HYDRO-HYDRO 6320 12200 17984
CHANDRAPURA TPSU1-3 DVC THERMAL-COAL 42000 257610 35095
CHANDRAPURA TPSU7-8 DVC THERMAL-COAL 50000 306673 34987
KODERMA TPS DVC THERMAL-COAL 100000 380180 38131
PANCHET HPS DVC HYDRO-HYDRO 8000 13360 17984
TILLAYA HPS DVC HYDRO-HYDRO 400 1410 17984
RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34700 35400
TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 277300 23200
TLDP -III NHPC LTD HYDRO-HYDRO 13200 55400 62000
TLDP -IV NHPC LTD HYDRO-HYDRO 16000 60300 25600
FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 957219 33700
FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 308943 41000
BONGAINGAON TPS NTPC LTD THERMAL-COAL 25000 153663 58600
KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 542277 34200
KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 942591 34200
BARH-II NTPC LTD THERMAL-COAL 132000 728021 44500
TALCHER TPS NTPC LTD THERMAL-COAL 46000 335521 30100
TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 702319 25600
TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1436521 24700
STATE SECTOR
BTPS(RampM) BIHAR STATE PGCL THERMAL-COAL 22000 12142 39700
BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 98331 10602
HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 50593 9482
CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 19689 2605
RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 53192 6033
UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 147208 14637
Page 40
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 60353 4519
IB TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 288567 25000
J P H GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 210 038 61100
MEYONG CHU GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 400 1086 61100
TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 122667 38200
DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 214339 43321
KOLAGHAT THERMAL POWER
STATION
WEST BENGAL PDCL THERMAL-COAL 126000 538269 31603
BAKRESHWAR THERMAL POWER
PLANT
WEST BENGAL PDCL THERMAL-COAL 105000 634876 32154
BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 45000 166855 33299
SANTHALDIH THERMAL POWER
STATION
WEST BENGAL PDCL THERMAL-COAL 50000 336442 34932
SAGARDIGHI THERMAL POWER
PROJECT
WEST BENGAL PDCL THERMAL-COAL 160000 423121 34705
JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 20344 68900
RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 24559 68900
TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 4623 68900
PURULIA PUMPED STORAGE
PROJECT
WEST BENGAL SEDCL HYDRO-HYDRO 90000 108816 68900
MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2768 68900
PRIVATE SECTOR
CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 49474 20230
CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 555500 70200
HALDIA ENERGY HALDIA ENERGY LTD THERMAL-COAL 60000 371000 50400
DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3688 63400
KAMALANGA TPS GMR KAMALANGA ENERGY LTD THERMAL-COAL 105000547670
33300
ADHUNIK POWER U-1 ADHUNIK POWER THERMAL-COAL 27000 158 44060
ADHUNIK POWER U-2 ADHUNIK POWER THERMAL-COAL 27000 168 44250
VL-JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 332800 23622
JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 43000 45250
JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 71700 37030
JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 70700 35920
JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 71100 38870
JOJOBERA UNIT 5 TATA POWER COM LTD THERMAL-COAL 12000 79300 44560
JOJOBERA UNIT 6 TATA POWER COM LTD THERMAL-WHR 12000 83700 12840
IEL KALINGANAGAR U-I TATA POWER COM LTD THERMAL-WG 6750 33400 22500
IEL KALINGANAGAR U-II TATA POWER COM LTD THERMAL-WG 6750 34800 22500
MAITHON UNIT 1 amp 2 TATA POWER COM LTD THERMAL-COAL 105000 678000 36100
HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 27500 24340
HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 28400 24340
HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 15800 24310
NORTH EASTERN REGION
CENTRAL SECTOR
LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 74100 36600
AGARTALA GT NEEPCO THERMAL-GAS 13500 88611 27210
ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 153111 32310
DOYANG HEP NEEPCO HYDRO-HYDRO 7500 25598 49801
KOPILI HEP NEEPCO HYDRO-HYDRO 20000 98186 11491
KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 19582 20237
KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 10310 17968
RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 124093 22945
TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 10100 17344 39000
STATE SECTOR
HYDRO POWER (122 Stns) ITANAGAR GOVT OF ARUNACHAL
PRADESHHYDRO-HYDRO 6971 6217270
24600
KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39514 17337
LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 82327 36810
NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 33318 48290
MYNTRIANG SHEP ST II ASSAM POWER GENCO HYDRO-HYDRO 300 567 35776
LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 9130 49200
LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 012 49200
DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 022 49200
TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 000 49200
UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 4990 16000
UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 6476 37000
UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 16494 14600
UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 3600 9556 15000
SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 758 8000
MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44070 44800
KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 154 41400
TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 091 41400
MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 411 41400
MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 394 41400
KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 760 41400
SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 3264 41400
LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 044 41400
BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 18953 28000
ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 43585 28200
GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 4080 11100
Note
LIG Lignite N Naptha WHR Waste Heat Recovery
Page 41
File NoCEA-CH-14-1142018-Coordination Division
Achievement Targets Achievement
Oct-17
Thermal 0 1280 600 NA
Hydro 30 0 0 000
Nuclear 0 0 0 NA
All India 30 1280 600 200000
April 2017- Oct 2017 April 2018- Oct 2018 Change
Thermal 4300 670 -84
Hydro 308 140 -55
Nuclear 0 0 NA
All India 4608 810 -82
Note Lakwa Replacement Power Project (69755 MW) had achieved COD on 260418 but
the intimation regarding COD was received in Oct18 (Additional Capacity addition)
2
2 Generating Capacity Addition for Oct-2018 (MW)
Generating Capacity Addition during April 2017- Oct 2017 amp April 2018- Oct 2018
NA- Not Applicable
Change wrt
Oct-2017Type
Oct-18
300
6000
0
100
200
300
400
500
600
700
1Oct-17 Oct-18
0
500
1000
1500
2000
2500
3000
3500
4000
4500
5000
April 2017- Oct 2017 April 2018- Oct 2018
File NoCEA-CH-14-1142018-Coordination Division
(i)
(ii)
(iii)
Nuclear Hydro RES Grand TotalRegion Coal Gas Diesel Total
Northern 5128020 578126 000 5706146 162000 1970777 1363391 9202314
Western 7120862 1080649 000 8201511 184000 754750 2102418 11242679
Southern 4578202 647366 76158 5301726 332000 1183803 3597107 10414636
Eastern 2720164 10000 000 2730164 000 494212 108364 3332740
North-East 52002 177581 3600 233183 000 145200 28745 407128
Islands 000 000 4005 4005 000 000 1256 5261
ALL INDIA 19599250 2493722 83763 22176734 678000 4548742 7201281 34604757
Note Captive Genaration is not included in the total Captive Power capacity as on 31032017 RES as on 30092018 3
Thermal
Nuclear
3 List of Projects Commissioned During Oct-2018
4 All India Installed Capacity (MW) Region-wise as on 31-10-18
Mahan TPP of Essar Power MP ltd of capacity 600 MW was commissioned on 07102018
NIL
Thermal
NIL
Hydro
22176734
678000
4548742
7201281
34604757
51529
000
5000000
10000000
15000000
20000000
25000000
30000000
35000000
40000000
Thermal Nuclear Hydro RES Total Captive
Thermal Nuclear Hydro RES Total Captive
Total = 34604757
File NoCEA-CH-14-1142018-Coordination Division
Sector
Coal Gas Diesel Total
State 6359650 711871 36393 7107913 000 2994200 200887 10303000
Private 7614600 1058060 47370 8720030 000 339400 6850164 15909594
Central 5625000 723791 000 6348791 678000 1215142 150230 8392163
All India 19599250 2493722 83763 22176734 678000 4548742 7201281 34604757
State 10303000
Private 15909594
Central 8392163
Electricity Generation (MU) Targets and Achievements for 2016-17
5 All India Installed Capacity (MW) Sector-wise as on 31-10-18
4
Grand TotalTHERMAL
Nuclear Hydro RES
RES as on 30092018
State 10303000 30
Private 15909594 46
Central 8392163 24
All India Installed Capacity(MW) as on 31-10-2018 (Sector-Wise)
File NoCEA-CH-14-1142018-Coordination Division
Voltage Level
+- 500 KV HVDC
+- 800 KV HVDC
765 KV
400 KV
220 KV
All India
Voltage Level
+- 500 KV HVDC
+- 800 KV HVDC
765 KV
400 kV
220 KV
All India
5
0 0
6 Transmission Lines Added during Oct-2018 (Ckms)
Oct-17 Oct-18
0 0
0 0
0 729
245 737
324 401
569 1867
Transmission Lines Added duringApril 2017- Oct 2017 ampApril 2018- Oct 2018 (Ckms)
April 2017- Oct 2017 April 2018- Oct 2018
2151 4521
13120 11799
0 0
2046 2464
8923 4814
569
1867
0
500
1000
1500
2000
All India
Ckm
s
Oct-17 Oct-18
13120
11799
11000
11500
12000
12500
13000
13500
All India
Ckm
s
April 2017- Oct 2017 April 2018- Oct 2018
File NoCEA-CH-14-1142018-Coordination Division
Voltage Level
+- 800 KV HVDC
+- 500 KV HVDC
765 KV
400 KV
220 KV
All India
Voltage Level
+- 800 KV HVDC
+- 500 KV HVDC
765 KV
400 KV
220 KV
All India
6
7 Transformation Capacity Addition During Oct-2018 (MVA)
0
0
2575
1025
0 0
Oct-17 Oct-18
3600
0
3000
9840
4620
2220
3000 0
All India Transformation Capacity Addition during April 2017- Oct 2017 amp April
2018- Oct 2018 (MVA)
41790
0
14000
17180
10610
45665
10000
23020
9645
0
April 2017- Oct 2017 April 2018- Oct 2018
3600
9840
0
2000
4000
6000
8000
10000
12000
MV
A
Oct-17 Oct-18
4566541790
0
74520
1
MV
A
April 2017- Oct 2017 April 2018- Oct 2018
File NoCEA-CH-14-1142018-Coordination Division
Oct-2017 Oct-2018 Oct-2017 Oct-2018 Oct-2017 Oct-2018
Northern 31786 31822 31096 31375 -22 -14
Western 31728 36308 31628 36178 -03 -04
Southern 24314 29392 24271 29342 -02 -02
Eastern 12012 12547 11931 12507 -07 -03
North Eastern 1487 1387 1451 1351 -24 -25
All India 101327 111455 100377 110753 -09 -06
Oct-2017 Oct-2018 Oct-2017 Oct-2018 Oct-2017 Oct-2018
Northern 51307 50659 50289 49635 -20 -20
Western 48530 56548 46392 55695 -44 -15
Southern 39142 45279 38905 45226 -06 -01
Eastern 19850 22959 19836 22567 -01 -17
North Eastern 2596 2790 2499 2700 -37 -32
All India 162027 172945 157394 170604 -29 -14
Oct-2018 Figures are Provisional
7
8 Power Supply Position (Energy amp Peak) in Oct-2018
Peak Demand Peak Met
Requirement Availability
Energy (MU)Region
Surplus(+)
Deficit (-) in
Surplus(+)
Deficit (-) in Region
Power (MW)
File NoCEA-CH-14-1142018-Coordination Division
Chandigarh Delhi Haryana HP JampK Punjab Rajasthan UP Utrakhand Oct-2017 0 0 0 0 516 0 0 0 0
Oct-2018 0 0 0 0 567 0 0 688 0
Chattisgarh Gujarat MP Maharastra Daman amp Diu Dadar Nagar Goa
Oct-2017 16 0 13 2062 0 0 25
Oct-2018 146 19 39 705 1 4 0
AP Telangana Karnataka Kerala Tamil Nadu Puducherry Lakshadweep
Oct-2017 18 19 0 211 38 2 0
Oct-2018 0 0 0 83 414 1 0
8
9 Peak Shortage of Power Supply (MW) in Different Regions in Oct-2018
0 0 0 0
567
0 0
688
00 0 0 0
516
0 0 0 0
0
400
800
Chan
dig
ar
h
Delh
i
Hary
ana
HP
Jamp
K
Pu
nj
ab
Raja
sth
an
UP
Utr
ak
hand
MW
Northern States (MW) Oct-2018 Oct-2017
146
19
39 705
1 4 016
0 13
2062
0 0 25
0
5000
Ch
attis
garh
Guja
rat
MP
Mah
ara
st
ra
Da
man amp
Diu
Da
dar
Na
gar G
oaM
W
Western States (MW) Oct-2018 Oct-2017
0 0 083
414
1 018 19 0
211
38 2 00
500
AP Telangana Karnataka Kerala Tamil Nadu Puducherry Lakshadweep
Southern State (MW) Oct-2018 Oct-2017
File NoCEA-CH-14-1142018-Coordination Division
Bihar DVC Jharkhand Odisha West Bengal Sikkim AampN Island
Oct-2017 6 0 0 0 8 0 4
Oct-2018 0 0 0 400 0 0 4
Arunachal Assam Manipur Meghalaya Mizoram Nagaland Tripura
Oct-2017 6 77 4 0 2 2 12
Oct-2018 13 81 2 0 2 3 0
9
0 0 0
400
0 0 46 0 0 0 8 0 4
0100200300400500
Bih
ar
DV
C
Jha
rkh
an
d
Od
ish
a
We
st
Be
ng
al
Sik
kim
Aamp
NIs
land
MW
Eastern States (MW) Oct-2018 Oct-2017
13
81
2 0 2 3 06 4 0 2 2
12
0
100
Aru
na
ch
al
Assa
m
Ma
nip
ur
Meghal
aya
Miz
ora
m
Na
gala
nd
Trip
ura
MW
North-Eastern States (MW)
File NoCEA-CH-14-1142018-Coordination Division
Sector Oct-2017 Oct-2018
Central 6872 7355
State 5217 6078
Private 6045 6819
ALL INDIA 5882 6524
Month PLF 2017 PLF 2018
Jan 6014 6288
Feb 6153 6285
March 6313 6558
April 6493 6458
May 6355 6554
June 5672 5917
July 537 5545
Aug 5733 5639
Sep 5989 6109
Oct 5882 6524
For Coal and Lignite based Power Plants and Provisional based on Actual-Cum-Assesment
10
PLF of Thermal Power Plants
All India PLF of Thermal Plants (Excluding Gas Based Plants) Month-wise
10 All India PLF Sector-wise for Oct-2018
68
72
52
17
60
45
58
8273
55
60
78
68
19
65
24
000
1000
2000
3000
4000
5000
6000
7000
8000
Central State Private ALL INDIA
P
LF
Oct-2017 Oct-2018
0
10
20
30
40
50
60
70
Jan Feb March April May June July Aug Sep Oct
Months
All India PLF Month-wise
PLF 2017 PLF 2018
File NoCEA-CH-14-1142018-Coordination Division
2012-13 2013-14 2014-15 2015-16 2016-17
TampD Losses 2304 2284 2277 2181 2142
ATampC Losses 2548 2258 2462
Note As per PFC for utilities selling directly to consumers
Total Number of Villages
597464
Note From the year 2004-05 onwards Definition of Village Electrification-
A village would be declared Electrified if
Without
Subsidy
Gap ACS-
ARR(
Without
Subsidy)
Paiseunit
Gap ACS-
ARR (on
subsidy
booked
basis)
paiseunit
Gap ACS-
ARR (on
subsidyrece
ived basis)
paiseunit
2013-14 400 118 76 77
2014-15 412 108 58 60
Source- PFC Reports on the performance of State Power Utilities
2013-14 4894
2014-15 5304
2015-16 5459
2016-17 5743
2017-18 6080
11
Average cost of supply(ACS)
(paiseunit)
i) Basic Infrastructure such as Distribution Transformer and Distribution lines are provided in the inhabited locality
as well as Dalit Basti hemlet where it exists (For electrification through Non-Conventional Energy Sources a
Distribution Transformer may not be necessary)
14 All India Coal consumption for Power Generation (MT)
520
Average Revenue Realization(paiseunit)
518
Year
ii) Electricity is provided to Public places like Schools Panchayat Office Health Centre Dispensaries Community
Centres etc and
iv) Mandatory Certification from Gram Panchayat regarding the completion of village electrification should be
obtained
13 Average cost of Power amp Average Realisation
iii) The number of households electrified should be at least 10 of the total number of households in the village
11 T amp D and ATampC Losses ()
12 All India Village Electrification
Villiages Electrified (Nos)
10000All villages as per census 2011 has
been electrified on 28042018
Villages electrified
File NoCEA-CH-14-1142018-Coordination Division
SN Contents Page
1 Capacity Addition Targets and Achievements in 12th Plan 12
2 Capacity Addition Targets amp Achievements during Oct-2018 and April 2018- Oct 2018 13
3 Installed Capacity in various Regions including their shares 14-19
Section B - Capacity Addition
File NoCEA-CH-14-1142018-Coordination Division
Figures in MW
TARGET ACH TARGET ACH TARGET ACH TARGET ACH
CENTRAL 14878 15869 6004 2584 5300 2000 26182 20453
STATE 13922 22201 1608 2276 0 0 15530 24477
PRIVATE 43540 53661 3285 619 0 0 46825 54280
ALL INDIA 72340 91730 10897 5479 5300 2000 88537 99209
Figures in MW
Thermal Hydro Nuclear Total
Target Ach Target Ach Target Ach Target Ach
Central 4880 3170 800 390 500 6180 3560 5761
State 3546 1760 300 200 0 3846 1960 5096
Private 2940 3780 205 205 0 3145 3985 12671
Total 11366 8710 1305 795 500 0 13171 9505 7217
12
2 CAPACITY ADDITION TARGET AND ACHIEVEMENT FOR 2017-18 (IN MW)
1 Capacity Addtion Targets and Achievements in the 12th Plan
SECTORTHERMAL HYDRO NUCLEAR TOTAL
File NoCEA-CH-14-1142018-Coordination Division
(MW)
Cummulative
Deviation
Target Achievement Target Achievement (+) (-)
Central 2760 250 0 250 0 -250
State 450615 1030 0 1030 69755 -960245
Private 0 0 600 0 600 600
Total 726615 1280 600 1280 669755 -610245
Central 710 0 0 110 110 0
State 130 0 0 12999 30 -9999
Private 0 0 0 0 0 0
Total 840 0 0 23999 140 -9999
Nuclear Central 0 0 0 0 0 0
Central 3470 250 0 360 110 -250
State 463615 1030 0 115999 99755 -1060235
Private 0 0 600 0 600 600
Total 810615 1280 600 151999 809755 -710235
Electricity Generation (MU) Targets and Achievements for 2016-17
13
2 Capacity Addition Targets Achievements During Oct-2018
Schemes Sector
Target 2018-19
April 2018- Oct 2018Oct-18
Hydro
All India
Capacity Addition TargetsAchievements during the Month of Oct-2018
Thermal
12
80
24
0
0
15
20
67
0
14
0
0
81
0
0
200
400
600
800
1000
1200
1400
1600
Thermal Hydro Nuclear Total
MW
Targets and Achievement during 2018-19Target Achievement
600
0 00 0
600
0
100
200
300
400
500
600
700
800
900
1000
Target Achievement
MW
Targets and Achievement during Oct 2018Thermal Hydro
Nuclear Total
File NoCEA-CH-14-1142018-Coordination Division
Coal Gas Diesel Total
State 1593400 287920 000 1881320 000 869755 68956 2820031
Private 2276083 55800 000 2331883 000 251400 1261535 3844818
Central 1258537 234406 000 1492943 162000 849622 32900 2537465
Sub Total 5128020 578126 000 5706146 162000 1970777 1363391 9202314
State 2128000 284982 000 2412982 000 544650 31119 2988751
Private 3488567 467600 000 3956167 000 48100 2005170 6009437
Central 1504295 328067 000 1832362 184000 162000 66130 2244492
Sub Total 7120862 1080649 000 8201511 184000 754750 2102418 11242679
State 1943250 79198 28788 2051236 000 1183803 52102 3287141
Private 1212450 532210 47370 1792030 000 000 3495815 5287845
Central 1422502 35958 000 1458460 332000 000 49190 1839650
Sub Total 4578202 647366 76158 5301726 332000 1183803 3597107 10414636
State 695000 10000 000 705000 000 353792 22511 1081303
Private 637500 000 000 637500 000 39900 84853 762253
Central 1387664 000 000 1387664 000 100520 1000 1489184
Sub Total 2720164 10000 000 2730164 000 494212 108364 3332740
State 000 49771 3600 53371 000 42200 25674 121245
Private 000 2450 000 2450 000 000 2571 5021
Central 52002 125360 000 177362 000 103000 500 280862
Sub Total 52002 177581 3600 233183 000 145200 28745 407128
State 000 000 4005 4005 000 000 525 4530
Private 000 000 000 000 000 000 221 221
Central 000 000 000 000 000 000 510 510
Sub Total 000 000 4005 4005 000 000 1256 5261
State 6359650 711871 36393 7107913 000 2994200 200887 10303000
Private 7614600 1058060 47370 8720030 000 339400 6850164 15909594
Central 5625000 723791 000 6348791 678000 1215142 150230 8392163
Total 19599250 2493722 83763 22176734 678000 4548742 7201281 34604757
Figures at decimal may not tally due to rounding off
Note -
(As per latest information available with MNRE)
Break up of RES all India as on 30092018 is given below (in MW)
450695 3461510 2402166 7201281
A Oct 2018 669755 MW
B Capacity Retired
during
Oct 2018 705 MW
C Oct 2018 0 MW
D Oct 2018 A-B+C -35245 MW
Share of Telangana from JEGURUPADU CCPP Ph II has been removed and the same has been added to private sector of Andhra Pradesh due to expiry of PPA as per
request from TS Transco
Region
ALL INDIA INSTALLED CAPACITY (IN MW) OF POWER STATIONS (As on 31102018)
(UTILITIES)
Net Capacity Added during
1 RES include SHP BP UampI Solar and Wind Energy Installed capacity in respect of RES (MNRE) as on 30092018
Small
Hydro PowerWind Power
Bio-PowerSolar Power
Total
CapacityBM PowerCogen Waste to Energy
2 U-1 to 7 (76995=69755 MW) of LAKWA REPLACEMENT POWER PROJECT commissioned in April 2018 but intimated in October 2018
has been added to state sector of Assam
1 Badarpur TPS (705 MW) has been retired from central sector of Northern Region
Capacity Up-rated
Ownership Sector
873080 13830
Capacity Added during
1 U-2 (600 MW) of MAHAN TPP has been commissioned and added to private sector of Madhya Pradesh
Grand TotalThermalNuclear Hydro
Islands
ALL INDIA
Abbreviation- SHP=Small Hydro Project (le 25 MW) BP=Biomass Power UampI=Urban amp Industrial Waste Power RES=Renewable Energy Sources
Northern Region
Western Region
Southern Region
Eastern Region
North Eastern
Region
RES
(MNRE)
Modewise breakup
File NoCEA-CH-14-1142018-Coordination Division
Coal Gas Diesel Total
State 13500 180040 000 193540 000 000 000 193540
Private 86922 10800 000 97722 000 000 12157 109879
Central 311272 20701 000 331973 10283 72309 000 414565
Sub-Total 411694 211541 000 623235 10283 72309 12157 717984
State 272000 15000 000 287000 000 110282 5930 403212
Private 408078 000 000 408078 000 20000 34745 462823
Central 129472 53561 000 183034 10094 66370181 500 259998
Sub-Total 809550 68561 000 878112 10094 196652 41175 1126032
State 000 000 000 000 000 69460 25661 95121
Private 000 000 000 000 000 99200 60536 159736
Central 18340 6201 000 24541 2895 122388 000 149824
Sub-Total 18340 6201 000 24541 2895 291048 86197 404681
State 000 17500 000 17500 000 123000 12903 153403
Private 000 000 000 000 000 000 5985 5985
Central 50639 12907 000 63547 6798 109188 000 179533
Sub-Total 50639 30407 000 81047 6798 232188 18888 338921
State 176000 15000 000 191000 000 259770 12780 463550
Private 511550 000 000 511550 000 28800 115462 655812
Central 85458 26401 000 111859 19681 92342 000 223882
Sub-Total 773008 41401 000 814409 19681 380912 128242 1343244
State 585000 60380 000 645380 000 109618 2385 757383
Private 388200 000 000 388200 000 10400 710680 1109280
Central 120625 22110 000 142735 55674 73901 29400 301710
Sub-Total 1093825 82490 000 1176315 55674 193919 742465 2168373
State 546900 000 000 546900 000 72410 2510 621820
Private 871433 000 000 871433 000 84200 266691 1222324
Central 379639 54949 000 434588 28948 180253 3000 646789
Sub-Total 1797972 54949 000 1852921 28948 336863 272201 2490933
State 000 000 000 000 000 125215 6787 132002
Private 9900 45000 000 54900 000 8800 52244 115944
Central 34324 6966 000 41290 3124 47554 000 91968
Sub-Total 44224 51966 000 96190 3124 181569 59031 339914
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 3035 3035
Central 3815 1503 000 5317 801 10171 000 16289
Sub-Total 3815 1503 000 5317 801 10171 3035 19324
124953 29105 000 154058 23703 75145 000 252907
State 1593400 287920 000 1881320 000 869755 68956 2820031
Private 2276083 55800 000 2331883 000 251400 1261535 3844818
Central 1258537 234406 000 1492943 162000 849622 32900 2537465
Grand Total 5128020 578126 000 5706146 162000 1970777 1363391 9202314
Uttar Pradesh
Uttarakhand
Chandigarh
Grand TotalThermalNuclear
Hydro
(Renewable)
RES
(MNRE)
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
NORTHERN REGION
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
(As on 31102018)
Central - Unallocated
Total (Northern
Region)
Delhi
Haryana
Himachal Pradesh
Jammu amp Kashmir
Punjab
Rajasthan
State Ownership Sector
Modewise breakup
File NoCEA-CH-14-1142018-Coordination Division
(As on 31102018)
Coal Gas Diesel Total
State 000 000 000 000 000 000 005 005
Private 000 4800 000 4800 000 000 091 4891
Central 45478 1967 000 47445 2600 000 000 50045
Sub-Total 45478 6767 000 52245 2600 000 096 54941
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 1301 1301
Central 12663 4334 000 16997 700 000 000 17697
Sub-Total 12663 4334 000 16997 700 000 1301 18998
State 475000 217782 000 692782 000 77200 800 770782
Private 776567 396000 000 1172567 000 000 729782 1902349
Central 309051 42400 000 351451 55900 000 23830 431181
Sub-Total 1560618 656182 000 2216800 55900 77200 754412 3104312
State 408000 000 000 408000 000 170366 8396 586762
Private 617400 10000 000 627400 000 000 378205 1005605
Central 279441 25700 000 305141 27300 152000 30000 514441
Sub-Total 1304841 35700 000 1340541 27300 322366 416601 2106808
State 228000 000 000 228000 000 12000 1105 241105
Private 849000 000 000 849000 000 000 52430 901430
Central 195344 000 000 195344 4800 10000 000 210144
Sub-Total 1272344 000 000 1272344 4800 22000 53535 1352679
State 1017000 67200 000 1084200 000 285084 20813 1390097
Private 1245600 56800 000 1302400 000 48100 842815 2193315
Central 433475 227273 000 660748 69000 000 12300 742048
Sub-Total 2696075 351273 000 3047348 69000 333184 875927 4325459
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 546 546
Central 17444 6634 000 24078 900 000 000 24978
Sub-Total 17444 6634 000 24078 900 000 546 25524
211400 19759 000 231159 22800 000 000 253959
State 2128000 284982 000 2412982 000 544650 31119 2988751
Private 3488567 467600 000 3956167 000 48100 2005170 6009437
Central 1504295 328067 000 1832362 184000 162000 66130 2244492
Grand Total 7120862 1080649 000 8201511 184000 754750 2102418 11242679
Central - Unallocated
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
WESTERN REGION
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
State Ownership Sector
Modewise breakup
Grand TotalThermalNuclear
Hydro
(Renewable)
RES
(MNRE)
Total (Western
Region)
Goa
Daman amp Diu
Gujarat
Madhya Pradesh
Chhattisgarh
Maharashtra
Dadra amp Nagar
Naveli
File NoCEA-CH-14-1142018-Coordination Division
(As on 31102018)
Coal Gas Diesel Total
State 501000 23540 000 524540 000 167360 4875 696775
Private 387388 381318 3680 772386 000 000 693073 1465459
Central 167456 000 000 167456 12727 000 25000 205183
Sub-Total 1055844 404858 3680 1464382 12727 167360 722948 2367417
State 508250 000 000 508250 000 247993 4022 760265
Private 83945 83182 000 167127 000 000 375048 542175
Central 195612 000 000 195612 14873 000 1000 211485
Sub-Total 787807 83182 000 870989 14873 247993 380070 1513925
State 502000 000 12792 514792 000 359980 15533 890305
Private 195850 000 2520 198370 000 000 1275640 1474010
Central 282920 000 000 282920 69800 000 000 352720
Sub-Total 980770 000 15312 996082 69800 359980 1291173 2717035
State 000 000 15996 15996 000 188150 15402 219548
Private 61500 17400 000 78900 000 000 20899 99799
Central 114322 35958 000 150280 36200 000 5000 191480
Sub-Total 175822 53358 15996 245176 36200 188150 41301 510827
State 432000 52408 000 484408 000 220320 12270 716998
Private 483767 50310 41170 575247 000 000 1130984 1706231
Central 448952 000 000 448952 144800 000 18190 611942
Sub-Total 1364719 102718 41170 1508607 144800 220320 1161444 3035171
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 000 000
Central 10000 000 000 10000 000 000 000 10000
Sub-Total 10000 000 000 10000 000 000 000 10000
State 000 3250 000 3250 000 000 000 3250
Private 000 000 000 000 000 000 171 171
Central 24840 000 000 24840 8600 000 000 33440
Sub-Total 24840 3250 000 28090 8600 000 171 36861
178400 000 000 178400 45000 000 000 223400
State 1943250 79198 28788 2051236 000 1183803 52102 3287141
Private 1212450 532210 47370 1792030 000 000 3495815 5287845
Central 1422502 35958 000 1458460 332000 000 49190 1839650
Grand Total 4578202 647366 76158 5301726 332000 1183803 3597107 10414636
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
SOUTHERN REGION
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
State Ownership Sector
Modewise breakup
Grand TotalThermal RES
(MNRE)Nuclear
Hydro
(Renewable)
Kerala
Tamil Nadu
NLC
Puducherry
Central - Unallocated
Total (Southern
Region)
Andhra Pradesh
Telangana
Karnataka
File NoCEA-CH-14-1142018-Coordination Division
(As on 31102018)
Coal Gas Diesel Total
State 71000 000 000 71000 000 000 7070 78070
Private 28100 000 000 28100 000 000 25545 53645
Central 291433 000 000 291433 000 11000 000 302432
Sub-Total 390533 000 000 390533 000 11000 32615 434147
State 42000 000 000 42000 000 13000 405 55405
Private 73000 000 000 73000 000 000 3207 76207
Central 39374 000 000 39374 000 6100 000 45474
Sub-Total 154374 000 000 154374 000 19100 3612 177086
State 540000 10000 000 550000 000 98600 9195 657795
Private 242500 000 000 242500 000 000 34452 276952
Central 76077 000 000 76077 000 41000 000 117077
Sub-Total 858577 10000 000 868577 000 139600 43647 1051824
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 000 000
Central 698504 000 000 698504 000 18620 000 717124
Sub-Total 698504 000 000 698504 000 18620 000 717124
State 42000 000 000 42000 000 206192 630 248822
Private 293900 000 000 293900 000 000 21648 315548
Central 163390 000 000 163390 000 8900 1000 173290
Sub-Total 499290 000 000 499290 000 215092 23278 737660
State 000 000 000 000 000 36000 5211 41211
Private 000 000 000 000 000 39900 001 39901
Central 8703 000 000 8703 000 6400 000 15103
Sub-Total 8703 000 000 8703 000 82300 5212 96215
110183 000 000 110183 000 8501 000 118684
State 695000 10000 000 705000 000 353792 22511 1081303
Private 637500 000 000 637500 000 39900 84853 762253
Central 1387664 000 000 1387664 000 100520 1000 1489184
Grand Total 2720164 10000 000 2730164 000 494212 108364 3332740
(As on 31102018)
Coal Gas Diesel Total
State 000 32821 000 32821 000 10000 3001 45822
Private 000 2450 000 2450 000 000 1680 4130
Central 27902 43556 000 71458 000 36851 000 108309
Sub-Total 27902 78827 000 106729 000 46851 4681 158261
State 000 000 000 000 000 000 10710 10710
Private 000 000 000 000 000 000 539 539
Central 2470 4682 000 7152 000 11800 000 18952
Sub-Total 2470 4682 000 7152 000 11800 11249 30201
State 000 000 000 000 000 32200 3103 35303
Private 000 000 000 000 000 000 006 006
Central 3040 10969 000 14009 000 7446 000 21455
Sub-Total 3040 10969 000 14009 000 39646 3109 56764
State 000 16950 000 16950 000 000 1601 18551
Private 000 000 000 000 000 000 009 009
Central 3740 43695 000 47435 000 7077 500 55012
Sub-Total 3740 60645 000 64385 000 7077 2110 73572
State 000 000 3600 3600 000 000 545 4145
Private 000 000 000 000 000 000 217 217
Central 3140 7157 000 10297 000 9677 000 19974
Sub-Total 3140 7157 3600 13897 000 9677 762 24336
State 000 000 000 000 000 000 3067 3067
Private 000 000 000 000 000 000 100 100
Central 2140 4893 000 7033 000 5860 000 12893
Sub-Total 2140 4893 000 7033 000 5860 3167 16060
State 000 000 000 000 000 000 3647 3647
Private 000 000 000 000 000 000 020 020
Central 2070 4046 000 6116 000 9913 000 16029
Sub-Total 2070 4046 000 6116 000 9913 3667 19696
7500 6362 000 13862 000 14376 000 28238
State 000 49771 3600 53371 000 42200 25674 121245
Private 000 2450 000 2450 000 000 2571 5021
Central 52002 125360 000 177362 000 103000 500 280862
Grand Total 52002 177581 3600 233183 000 145200 28745 407128
Central - Unallocated
Total (Eastern
Region)
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
NORTH-EASTERN REGION
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
State Ownership Sector
Modewise breakup
Grand TotalThermalNuclear
Bihar
Jharkhand
West Bengal
DVC
Odisha
Sikkim
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
EASTERN REGION
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
Ownership Sector
Modewise breakup
Grand TotalThermalNuclear
Hydro
(Renewable)
RES
(MNRE)
Manipur
Nagaland
State
Mizoram
Central - Unallocated
Total (North-
Eastern Region)
Hydro
(Renewable)
RES
(MNRE)
Assam
Arunachal Pradesh
Meghalaya
Tripura
File NoCEA-CH-14-1142018-Coordination Division
(As on 31102018)
Coal Gas Diesel Total
State 000 000 4005 4005 000 000 525 4530
Private 000 000 000 000 000 000 146 146
Central 000 000 000 000 000 000 510 510
Sub-Total 000 000 4005 4005 000 000 1181 5186
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 075 075
Central 000 000 000 000 000 000 000 000
Sub-Total 000 000 000 000 000 000 075 075
State 000 000 4005 4005 000 000 525 4530
Private 000 000 000 000 000 000 221 221
Central 000 000 000 000 000 000 510 510
Grand Total 000 000 4005 4005 000 000 1256 5261
19
Andaman amp
Nicobar
lakshadweep
Total (Islands)
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
State Ownership Sector
Modewise breakup
Grand TotalThermalNuclear
Hydro
(Renewable)
RES
(MNRE)
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
ISLANDS
File NoCEA-CH-14-1142018-Coordination Division
SrNo Contents Page
1 Executive summary of Target and Achievement of Transmission Lines during 2018-19
20(1)
2 List of Transmission Lines CommissionedReady for commissioning during Oct-2018 20(2)
Section C - Transmission Lines
File NoCEA-CH-14-1142018-Coordination Division
Executive summary of Target and Achievement of Transmission Lines during 2018-19 As on Oct-18
(All figures in circuit kms)
Centr
al S
ecto
r
Sta
te S
ecto
r
JV
Private
Secto
r
To
tal
Centr
al S
ecto
r
Sta
te S
ecto
r
JV
Private
Secto
r
To
tal
Centr
al S
ecto
r
Sta
te S
ecto
r
JV
Private
Secto
r
To
tal
Centr
al S
ecto
r
Sta
te S
ecto
r
JV
Private
Secto
r
To
tal
Centr
al S
ecto
r
Sta
te S
ecto
r
JV
Private
Secto
r
To
tal
Cen
tral S
ecto
r
Sta
te S
ecto
r
JV
Pri
vate
Secto
r
Gra
nd
To
tal
0 0 0 0 0 0 0 0 4692 766 827 6285 3045 5906 980 9931 553 5878 0 6431 8290 12550 1807 22647
Oct18 Programme 0 0 0 0 0 0 0 0 300 0 0 300 662 90 562 1314 0 723 0 723 962 813 562 2337
Achievement 0 0 0 0 0 0 0 0 729 0 0 729 471 266 0 737 0 401 0 401 1200 667 0 1867
Upto Oct-18 Programme 0 0 0 0 0 0 0 0 3004 416 0 3420 1350 3109 562 5021 481 4346 0 4827 4835 7871 562 13268
Achievement 0 0 0 0 0 0 0 0 2286 0 178 2464 1436 1783 1595 4814 60 4461 0 4521 3782 6244 1773 11799
20(1)
220 kV Grand Total 800 kV 500 kV
Programme 2018-19
Programme
Achievement
HVDC765 kV 400 kV
File NoCEA-CH-14-1142018-Coordination Division
SlNo Line
Length
(cKM)
1 2 3 4 5 6
1 765 Jharsuguda - Dharamjaygarh line DC PGCIL 296
2 765LILO of Kurnool - Thirvualam line at
CuddapahDC PGCIL 190
3 765 Salem PS - Madhugiri PS line SC PGCIL 243
4 400 Cuddapah - Hindupur line (Q) DC PGCIL 338
5 400LILO of Both Ckt of Bamnauli - Samaypur at
TughlakabadMC PGCIL 114
6 400LILO-Out of Cuddapah - Hindupur line (Q)
(Both Ckts) at NP Kunta ssDC PGCIL 19
1200
7 400LILO of Sterlite - Meramundali at Lapanga
4oo kV ssDC OPTCL 14
8 400 Sterlite - Lapanga line DC OPTCL 37
9 400 TMDC Podili - Sattapenalli line DC APTRANSCO 215
10 230Neyveli 230110 kV ss - Eachangadu
230kV FeederSC TANTRANSCO 1
11 230 NNTPS - Neyveli 230110kV ss DC TANTRANSCO 2
12 220 Ajmer (400 kV) - Bherunda (TK) DC RVPNL 100
13 220 Aligarh - Atrauli line DC UPPTCL 77
14 220 Khandwa - Chhanera line DC MPPTCL 78
15 220LILO of one Ckt of Hadala - Sartanpar line
at Wankaner on MC towersDC GETCO 6
16 220 LILO of one Ckt of Vita - Miraj at Alkud ss DC MSETCL 27
17 220 Mendhigiri - Alkud ss DC MSETCL 110
667
1867
20(2)
Grand Total
2Transmission Lines (220 kV and above) CommissionedReady for commissioning During Oct-2018
As on 31-10-18
Voltage
Level (kV)Name of Transmission Lines
Circuit
Type
Executing
Agency
CENTRAL SECTOR
Total of CENTRAL SECTOR
STATE SECTOR Sector
Total of STATE SECTOR
File NoCEA-CH-14-1142018-Coordination Division
SN Contents Page
1 Executive summary of Target and Achievement of Substations during 2018-19 21(1)
2Sub Stations (220 kV and above) commissionedready for commisssioning during Oct-
201821(2)
Section D - Sub Stations
File NoCEA-CH-14-1142018-Coordination Division
1 Executive summary of Target and Achievement of Substations during 2018-19 As on Oct-18
(All figures in circuit MVA)
Centr
al S
ecto
r
Sta
te S
ecto
r
JV
Private
Secto
r
To
tal
Centr
al S
ecto
r
Sta
te S
ecto
r
JV
Private
Secto
r
To
tal
Centr
al S
ecto
r
Sta
te S
ecto
r
JV
Private
Secto
r
To
tal
Centr
al S
ecto
r
Sta
te S
ecto
r
JV
Private
Secto
r
To
tal
Centr
al S
ecto
r
Sta
te S
ecto
r
JV
Private
Secto
r
To
tal
Cen
tral S
ecto
r
Sta
te S
ecto
r
JV
Pri
vate
Secto
r
Gra
nd
To
tal
3000 0 0 3000 0 0 0 0 22200 0 0 22200 8185 13085 630 21900 740 14760 0 15500 34125 27845 630 62600
Oct18 Programme 0 0 0 0 0 0 0 0 0 0 0 0 1000 1260 630 2890 0 1400 0 1400 1000 2660 630 4290
Achievement 0 0 0 0 0 0 0 0 3000 0 0 3000 1500 3120 0 4620 0 2220 0 2220 4500 5340 0 9840
Upto Oct-18 Programme 0 0 0 0 0 0 0 0 10000 0 0 10000 6130 7435 630 14195 0 9670 0 9670 16130 17105 630 33865
Achievement 0 0 0 0 0 0 0 0 14000 0 0 14000 9000 7550 630 17180 0 10610 0 10610 23000 18160 630 41790
21(1)
220 kV Grand Total 800 kV 500 kV
Programme 2018-19
Programme
Achievement
HVDC765 kV 400 kV
File NoCEA-CH-14-1142018-Coordination Division
As on 31-10-18
Sl Voltage Ratio Capacity
No (kVkV) (MWMVA)
1 2 3 4 5
1 Cuddapah Ss 765400 PGCIL 3000
2 Tughlakabad SS (GIS) 400220 PGCIL 1500
Total of CENTRAL SECTOR 4500
3 Panki Kanpur (Aug) TF-I 400200 UPPTCL 75
4 Hindupur ss (1st ICT) 400220 APTRANSCO 315
5 Thappagundu ss 400110 TANTRANSCO 600
6 Mendhasal (2nd power TF) 400220 OPTCL 20
7 Jodhpur ss (New) 400220 RVPNL 315
8 Shankarpally 400220 TSTRANSCO 500
9 Podili ss (1st ICT) 400220 APTRANSCO 315
10 Doni (Gadag)SS 400220 KPTCL 1000
11 Porur (Addl TF) 230110 TANTRANSCO 100
12 Anuppankulam (Addl TF) 230110 TANTRANSCO 60
13 Neyveli SS 230110 TANTRANSCO 480
14 Savarkundla (Aug) 22066 GETCO 60
15 Bhuna (Aug) 220132 HVPNL 100
16 Madanpur (Aug) 22066 HVPNL 100
17 Gurgaon Sec-52A (Aug) 22066 HVPNL 160
18 IA Hisar (Aug) 220132 HVPNL 50
19 Narwana (Aug) 220132 HVPNL 60
20 Therubali (3rd Auto TF) 220132 OPTCL 160
21 Halasar ss 220132 RVPNL 160
22 Bansi Siddaharthnagar (Aug) TF-I 220132 UPPTCL 60
23 Hata Kushinagar (New) TF-I 220132 UPPTCL 100
24 Gomti nagar Lucknow (Aug) TF-IV 22033 UPPTCL 60
25 Kanpur Road Lucknow (New) TF-III 22033 UPPTCL 60
26 Asoj (Aug) 22066 GETCO 150
27 Kangasiyali (Aug) 22066 GETCO 60
28 Karmsad (Aug) 22066 GETCO 160
29 Lalpar (Aug) 22066 GETCO 60
TOTAL STATE SECTOR 5340
GRAND TOTAL 9840
21(2)
PRIVATE SECTOR
CENTRAL SECTOR
STATE SECTOR
2Sub-Stations (220 kV and above) CommissionedReady for commissioning During Oct-2018
Name of Sub StationsExecuting
Agency
File NoCEA-CH-14-1142018-Coordination Division
SN Contents Page
1 Electricity Generation (MU) Targets and Achievements for 2018-19 22
Section E - Electricity Generation
File NoCEA-CH-14-1142018-Coordination Division
Programme Achievement Ach Programme Achievement Ach
Central Sector 35160700 3028100 3162321 10443 20144400 21150469 10499
State Sector 35132000 3010000 3017260 10024 19922100 19549030 9813
PvtIPP Sector 36999700 3240600 3375603 10417 21598300 20794155 9628
PvtUTL Sector 1857600 164500 180597 10979 1130900 1203107 10638
Total 109150000 9443200 9735781 10310 62795700 62696761 9984
Central Sector 5617600 420900 451004 10715 4193000 4045436 9648
State Sector 6110600 559500 708469 12663 4049400 4433000 10947
PvtIPP Sector 1141800 80500 90122 11195 976400 1021963 10467
PvtUTL Sector 130000 11300 12564 11119 76700 99943 13030
Total 13000000 1072200 1262159 11772 9295500 9600342 10328
Central Sector 3850000 353300 303310 8585 2068900 2203540 10651
Total 3850000 353300 303310 8585 2068900 2203540 10651
Bhutan Import 500000 63300 35395 5592 347000 416660 12007
Central Sector 44628300 3802300 3916635 10301 26406300 27399445 10376
State Sector 41242600 3569500 3725729 10438 23971500 23982030 10004
Pvt Sector 40129100 3496900 3658886 10463 23782300 23119168 9721
Total 126500000 10932000 11336645 10370 74507100 74917303 10055
Provisional based on actual-cum-Assesment
Figs in MU
Cummulative
Achievement
Cummulative
Achievement
Sep-18 Sep-17 Upto Sep-2018 Upto Sep-2017
1073794 748889 7332680 5660929
22
Renewable Energy Generation
Achievement
Oct-2018
1 Electricity Generation (MU) Targets and Achievememts for 2018-19
All India Energy Generation During April 2018- Oct 2018 (MU)
Target (2018-19)April 2018- Oct 2018
Sector
Hydro
Thermal
Nuclear
627957
92955
20689
745071
626968
96003
22035
749173
0
100000
200000
300000
400000
500000
600000
700000
800000
Thermal Hydro Nuclear Total
Programme
Achievement
File NoCEA-CH-14-1142018-Coordination Division
SN Contents Page
1 Energy Power Supply Position (Provisional) for Oct-2018 and during April 2018- Oct 2018 23
2 Peak Power Supply Position (Provisional) for Oct-2018 and during April 2018- Oct 2018 24
3 Energy Power Supply Position (Revised) for Sep-2018 and during April 2018- Sept 2018 25
4 Peak Power Supply Position (Revised) for Sep-2018 and during April 2018- Sept 2018 26
5 Notified Power cuts Restrictions on Industries during Oct-2018 27
6 Power Supply to Agricultural Sector during Oct-2018 28
Section F - Power supply position
File NoCEA-CH-14-1142018-Coordination Division
आकड़ मममलयन यननट नट Figures in MU net
ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied
कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )
चडीगढ़ Chandigarh 108 108 0 00 1055 1055 0 00
दिलली Delhi 2490 2489 1 00 22524 22510 14 01
हरियजणज Haryana 4554 4554 0 00 35205 35205 0 00
दहमजचल परिश Himachal Pradesh 788 787 2 02 5728 5560 168 29
रमम कशमीि Jammu amp Kashmir 1497 1219 278 186 10982 8865 2117 193
परजब Punjab 4418 4418 0 00 38832 38819 13 00
िजरसथजन Rajasthan 6748 6748 0 00 45341 45181 160 04
उतति परिश Uttar Pradesh 10136 9973 164 16 75485 74808 676 09
उततिजखड Uttarakhand 1083 1081 3 03 8395 8310 85 10
उततरी कषतर Northern Region 31822 31375 447 14 243547 240314 3233 13
छततीसगढ़ Chhattisgarh 2454 2453 1 00 16119 16091 28 02
गरिजत Gujarat 11636 11636 0 00 70782 70768 14 00
मधय परिश Madhya Pradesh 5860 5859 1 00 38412 38410 2 00
महजिजषटर Maharashtra 15223 15095 128 08 95489 95355 134 01
िमन औि दिउ Daman amp Diu 216 216 0 00 1523 1523 0 00
िजिि व नगि हवली Dadra amp Nagar Haveli 553 553 0 00 3757 3757 0 00
गोवज Goa 366 366 0 00 2497 2495 2 01
पशचिमी कषतर Western Region 36308 36178 130 04 228579 228398 180 01
आनधर परिश Andhra Pradesh 5860 5854 6 01 37377 37334 43 01
तलगजनज Telangana 6748 6742 6 01 38251 38205 46 01
कनजाटक Karnataka 5842 5835 7 01 39111 39059 52 01
किल Kerala 2116 2096 20 09 14256 14160 96 07
तममल नजड Tamil Nadu 8611 8601 10 01 65742 65666 76 01
पडचिी Puducherry 216 215 1 05 1654 1646 8 05
लकष-दवीप Lakshadweep 4 4 0 0 27 27 0 0
दकषकषणी कषतर Southern Region 29392 29342 50 02 196390 196069 321 02
बबहजि Bihar 2742 2738 4 01 19143 18951 192 10
िजमोिि घजटी ननगम DVC 1712 1698 13 08 13096 12828 268 20
झजिखणड Jharkhand 701 697 4 06 5022 4949 73 15
ओडडशज Odisha 3147 3134 13 04 20224 20192 32 02
पशशचम बगजल West Bengal 4204 4200 4 01 33008 32881 127 04
मसशककम Sikkim 40 40 0 00 279 279 0 01
अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 67 202 188 13 67
परवी कषतर Eastern Region 12547 12507 40 03 90772 90080 692 08
अरणजचल परिश Arunachal Pradesh 67 66 1 09 502 496 7 13
असम Assam 833 809 24 29 6153 5903 250 41
मणणपि Manipur 72 71 1 10 485 478 7 14
मघजलय Meghalaya 147 147 0 00 1043 1042 0 00
ममज़ोिम Mizoram 63 62 1 08 365 359 5 14
नजगजलड Nagaland 76 67 8 110 540 481 59 109
बिपिज Tripura 130 129 1 09 1025 1007 19 18
उततर-परवी कषतर North-Eastern Region 1387 1351 35 25 10113 9766 346 34
समपणण भारत All India 111455 110753 702 06 769399 764627 4773 06
23
ऊराण वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Energy Power Supply Position Report (Provisional)
राजयStateअकरबर2018 October2018 अपरल2018 -अकरबर2018 April2018 to October2018
ऊरजा पनत ा म कमी ऊरजा पनत ा म कमीEnergy not Supplied
Excludes energy exported to Bangladesh
Energy not Supplied
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
File NoCEA-CH-14-1142018-Coordination Division
अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met
कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )
चडीगढ़ Chandigarh 217 217 0 00 369 369 0 00
दिलली Delhi 4713 4713 0 00 7016 7016 0 00
हरियजणज Haryana 7948 7948 0 00 10270 10270 0 00
दहमजचल परिश Himachal Pradesh 1520 1520 0 00 1520 1520 0 00
रमम कशमीि Jammu amp Kashmir 2836 2269 567 200 2951 2361 590 200
परजब Punjab 7979 7979 0 00 12638 12638 0 00
िजरसथजन Rajasthan 11450 11450 0 00 11698 11698 0 00
उतति परिश Uttar Pradesh 17434 16745 688 39 20498 20062 436 21
उततिजखड Uttarakhand 1943 1943 0 00 2143 2143 0 00
उततरी कषतर Northern Region 50659 49635 1024 20 63166 61726 1440 23
छततीसगढ़ Chhattisgarh 4414 4268 146 33 4414 4268 146 33
गरिजत Gujarat 18148 18130 19 01 18148 18130 19 01
मधय परिश Madhya Pradesh 11356 11317 39 03 11356 11317 39 03
महजिजषटर Maharashtra 23864 23159 705 30 23864 23254 610 26
िमन औि दिउ Daman amp Diu 342 341 1 02 357 356 1 02
िजिि व नगि हवली Dadra amp Nagar Haveli 784 780 4 05 816 815 1 01
गोवज Goa 536 536 0 00 596 596 0 00
पशचिमी कषतर Western Region 56548 55695 853 15 56548 55695 853 15
आनधर परिश Andhra Pradesh 9435 9435 0 00 9435 9435 0 00
तलगजनज Telangana 10603 10603 0 00 10815 10815 0 00
कनजाटक Karnataka 10741 10741 0 00 10741 10741 0 00
किल Kerala 3727 3644 83 22 4050 3997 53 13
तममल नजड Tamil Nadu 14747 14333 414 28 15029 14981 47 03
पडचिी Puducherry 363 362 1 03 420 400 19 46
लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0
दकषकषणी कषतर Southern Region 45279 45226 53 01 45946 45684 262 06
बबहजि Bihar 4945 4945 0 00 5050 5045 5 01
िजमोिि घजटी ननगम DVC 2729 2729 0 00 2874 2874 0 00
झजिखणड Jharkhand 1260 1260 0 00 1339 1284 55 41
ओडडशज Odisha 5624 5224 400 71 5624 5357 268 48
पशशचम बगजल West Bengal 8775 8775 0 00 9130 9123 7 01
मसशककम Sikkim 86 86 0 00 90 90 0 00
अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7
परवी कषतर Eastern Region 22959 22567 392 17 22959 22567 392 17
अरणजचल परिश Arunachal Pradesh 138 125 13 94 138 133 5 37
असम Assam 1785 1704 81 45 1865 1809 56 30
मणणपि Manipur 187 185 2 11 193 186 7 36
मघजलय Meghalaya 336 336 0 00 371 368 2 07
ममज़ोिम Mizoram 99 97 2 20 103 98 4 41
नजगजलड Nagaland 134 131 3 22 156 138 18 117
बिपिज Tripura 269 269 0 00 298 293 5 17
उततर-परवी कषतर North-Eastern Region 2790 2700 90 32 2967 2850 117 39
समपणण भारत All India 172945 170604 2341 14 177022 175528 1494 08
24
अधिकतम वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Peak Power Supply Position Report (Provisional)
आकड़ मगज वजट नट Figures in MW netअपरल2018 -अकरबर2018 April2018 to October2018
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
मजग की पनता म कमी Demand not Met
Excludes the supply to Bangladesh
राजयStateअकरबर2018 October2018
मजग की पनता म कमी Demand not Met
File NoCEA-CH-14-1142018-Coordination Division
आकड़ मममलयन यननट नट Figures in MU net
ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied
कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )
चडीगढ़ Chandigarh 141 141 0 00 947 947 0 00
दिलली Delhi 2925 2924 1 00 20034 20021 13 01
हरियजणज Haryana 4794 4794 0 00 30651 30651 0 00
दहमजचल परिश Himachal Pradesh 876 853 24 27 4940 4773 167 34
रमम कशमीि Jammu amp Kashmir 1520 1246 274 180 9485 7646 1839 194
परजब Punjab 5575 5575 0 00 34414 34401 13 00
िजरसथजन Rajasthan 6202 6201 0 00 38594 38434 160 04
उतति परिश Uttar Pradesh 10211 10124 86 08 65349 64836 513 08
उततिजखड Uttarakhand 1162 1149 13 11 7311 7229 82 11
उततरी कषतर Northern Region 33405 33008 398 12 211725 208939 2786 13
छततीसगढ़ Chhattisgarh 2403 2388 15 06 13665 13638 27 02
गरिजत Gujarat 10122 10122 0 00 59146 59132 14 00
मधय परिश Madhya Pradesh 5492 5491 1 00 32552 32551 1 00
महजिजषटर Maharashtra 13615 13612 3 00 80266 80260 6 00
िमन औि दिउ Daman amp Diu 221 221 0 00 1306 1306 0 00
िजिि व नगि हवली Dadra amp Nagar Haveli 551 551 0 00 3204 3204 0 00
गोवज Goa 339 339 0 00 2131 2128 2 01
पशचिमी कषतर Western Region 32742 32723 19 01 192270 192220 50 00
आनधर परिश Andhra Pradesh 5294 5287 7 01 31518 31480 37 01
तलगजनज Telangana 6279 6272 8 01 31503 31463 40 01
कनजाटक Karnataka 5701 5693 8 01 33269 33225 45 01
किल Kerala 2050 2026 24 12 12140 12063 76 06
तममल नजड Tamil Nadu 8971 8959 12 01 57131 57065 66 01
पडचिी Puducherry 226 224 2 08 1438 1431 7 05
लकष-दवीप Lakshadweep 4 4 0 0 23 23 0 0
दकषकषणी कषतर Southern Region 28520 28460 60 02 166998 166727 271 02
बबहजि Bihar 2839 2793 46 16 16400 16213 188 11
िजमोिि घजटी ननगम DVC 1901 1750 151 79 11384 11130 254 22
झजिखणड Jharkhand 740 723 17 22 4321 4252 69 16
ओडडशज Odisha 2921 2918 3 01 17077 17058 19 01
पशशचम बगजल West Bengal 4902 4879 23 05 28804 28681 123 04
मसशककम Sikkim 39 39 0 01 239 239 0 01
अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 67 173 162 12 67
परवी कषतर Eastern Region 13341 13102 240 18 78225 77573 652 08
अरणजचल परिश Arunachal Pradesh 74 73 1 10 435 429 6 14
असम Assam 950 914 36 38 5320 5094 226 43
मणणपि Manipur 70 69 1 11 414 408 6 15
मघजलय Meghalaya 150 150 0 01 896 896 0 01
ममज़ोिम Mizoram 58 57 1 12 302 297 5 16
नजगजलड Nagaland 80 72 8 104 464 414 50 108
बिपिज Tripura 192 191 1 07 895 878 17 19
उततर-परवी कषतर North-Eastern Region 1575 1527 48 31 8726 8415 311 36
समपणण भारत All India 109584 108819 765 07 657944 653873 4071 06
Energy not Supplied Energy not Supplied
ससतबर2018 September2018 अपरल2018 -ससतबर2018 April2018 to September2018
ऊरजा पनत ा म कमी ऊरजा पनत ा म कमी
Excludes energy exported to Bangladesh
राजयState
ऊराण वरवदयत आपरतण शथिरत ररपोरण (सशोधित) Energy Power Supply Position Report (Revised)
25
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
File NoCEA-CH-14-1142018-Coordination Division
अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met
कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )
चडीगढ़ Chandigarh 293 293 0 00 369 369 0 00
दिलली Delhi 5358 5358 0 00 7016 7016 0 00
हरियजणज Haryana 9008 9008 0 00 10270 10270 0 00
दहमजचल परिश Himachal Pradesh 1466 1466 0 00 1479 1479 0 00
रमम कशमीि Jammu amp Kashmir 2951 2361 590 200 2951 2361 590 200
परजब Punjab 11405 11405 0 00 12638 12638 0 00
िजरसथजन Rajasthan 10612 10612 0 00 11698 11698 0 00
उतति परिश Uttar Pradesh 18346 18121 225 12 20498 20062 436 21
उततिजखड Uttarakhand 1996 1996 0 00 2143 2143 0 00
उततरी कषतर Northern Region 56407 55649 758 13 63166 61726 1440 23
छततीसगढ़ Chhattisgarh 4404 4075 328 75 4404 4136 268 61
गरिजत Gujarat 16963 16963 0 00 17053 16963 90 05
मधय परिश Madhya Pradesh 8811 8771 41 05 8811 8775 36 04
महजिजषटर Maharashtra 22455 22349 106 05 23395 23254 141 06
िमन औि दिउ Daman amp Diu 357 356 1 02 357 356 1 02
िजिि व नगि हवली Dadra amp Nagar Haveli 816 815 1 01 816 815 1 01
गोवज Goa 596 596 0 00 596 596 0 00
पशचिमी कषतर Western Region 52933 52895 38 01 53841 52895 945 18
आनधर परिश Andhra Pradesh 9435 9416 19 02 9435 9416 19 02
तलगजनज Telangana 10815 10815 0 00 10815 10815 0 00
कनजाटक Karnataka 10103 10090 13 01 10690 10688 2 00
किल Kerala 3888 3638 251 64 4050 3997 53 13
तममल नजड Tamil Nadu 14556 14553 3 00 15029 14981 47 03
पडचिी Puducherry 390 372 17 45 420 400 19 46
लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0
दकषकषणी कषतर Southern Region 45542 45428 114 02 45946 45684 262 06
बबहजि Bihar 5050 5045 5 01 5050 5045 5 01
िजमोिि घजटी ननगम DVC 2641 2641 0 00 2874 2874 0 00
झजिखणड Jharkhand 1233 1233 0 00 1339 1284 55 41
ओडडशज Odisha 4906 4906 0 00 5357 5357 0 00
पशशचम बगजल West Bengal 8644 8639 5 01 9130 9123 7 01
मसशककम Sikkim 78 78 0 00 90 90 0 00
अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7
परवी कषतर Eastern Region 22110 22100 10 00 22470 22290 180 08
अरणजचल परिश Arunachal Pradesh 132 130 2 15 138 133 5 37
असम Assam 1865 1809 56 30 1865 1809 56 30
मणणपि Manipur 184 182 2 13 193 186 7 36
मघजलय Meghalaya 317 317 0 00 371 368 2 07
ममज़ोिम Mizoram 95 93 2 23 103 98 4 41
नजगजलड Nagaland 142 138 5 32 156 138 18 117
बिपिज Tripura 296 293 3 10 298 293 5 17
उततर-परवी कषतर North-Eastern Region 2921 2850 71 24 2967 2850 117 39
समपणण भारत All India 177022 175528 1494 08 177022 175528 1494 08
26
मजग की पनता म कमी मजग की पनता म कमी Demand not MetDemand not Met
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
Excludes the supply to Bangladesh
अधिकतम वरवदयत आपरतण शथिरत ररपोरण (सशोधित) Peak Power Supply Position Report (Revised)
आकड़ मगज वजट नट Figures in MW net
राजयStateससतबर2018 September2018 अपरल2018 -ससतबर2018 April2018 to September2018
File NoCEA-CH-14-1142018-Coordination Division
अकरबर2018 October2018अपरल2018 -अकरबर2018 April2018 to October2018
उततरी कषतर Northern Region
चडीगढ़ Chandigarh Data not received Data not received
दिलली Delhi
हरियजणज Haryana
दहमजचल परिश Himachal Pradesh
रमम कशमीि Jammu amp Kashmir Data not received Data not received
परजब Punjab
िजरसथजन Rajasthanउतति परिश Uttar Pradesh
उततिजखड Uttarakhand
पशचिमी कषतर Western Region
छततीसगढ़ Chhattisgarh
गरिजत Gujarat
मधय परिश Madhya Pradesh
महजिजषटर Maharashtra
गोवज Goa
दकषकषणी कषतर Southern Region
आनधर परिश Andhra Pradesh
तलगजनज Telangana
कनजाटक Karnataka
किल Kerala
तममल नजड Tamil Nadu
पडचिी Puducherryपरवी कषतर Eastern Region
बबहजि Bihar
झजिखणड Jharkhand
ओडडशज Odisha
पशशचम बगजल West Bengal
N
o No
tified
Cuts
N
o No
tified
Cuts
27
अकरबर 2018 म इडथरीर पर वरवदयत करौती का वरवरवरण Notified Power CutsRestrictions on Industries during October2018
राजय कषतर State Regionऊराणमाग करौती EnergyDemand Cut
No Notified Cuts No Notified Cuts
File NoCEA-CH-14-1142018-Coordination Division
अकरबर2018 October2018अपरल2018 -अकरबर2018 April2018 to October2018
उततरी कषतर Northern Region
चडीगढ़ Chandigarh Data not received Data not received
दिलली Delhi Data not received Data not received
हरियजणज Haryana 940 hrsday 0709 - 0950 hrsday
दहमजचल परिश Himachal Pradesh No cut imposed on agriculture consumers and uninterrupted
power is being supplied to agriculture sector
HPSEBL has only 2 agriculture consumers and uninterrupted
power is being supplied to agriculture sector
रमम कशमीि Jammu amp Kashmir Data not received Data not received
परजब Punjab 0507 hrsday 0349 - 0844 hrsday
िजरसथजन Rajasthan 0630 hrsday 0630 hrsday
उतति परिश Uttar Pradesh 1825 hrsday 1814 - 1858 hrsday
उततिजखड Uttarakhand 2350 hrsday 2128 - 2357 hrsday
पशचिमी कषतर Western Region
छततीसगढ़ Chhattisgarh 18hoursday 18 hrsday
गरिजत Gujarat 805 hrsday 805 hrsday
मधय परिश Madhya Pradesh Three-Phase Supply(Irrigation)-947 hrs day
Three-Phase (Mixed) Supply - 2311 hrs day
Three-Phase Supply(Irrigation)- 0933 - 0947 hrs day Three-
Phase (Mixed) Supply - 2300 - 2320 hrs day
महजिजषटर Maharashtra Three-Phase Supply(Irrigation)- 9 hrs day
Three-Phase (Mixed) Supply - 24 hrs day
Three-Phase Supply(Irrigation)- 9 hrs day
Three-Phase (Mixed) Supply - 24 hrs day
गोवज Goa No restriction No restriction
दकषकषणी कषतर Southern Region
आनधर परिश Andhra Pradesh 07 hrsday 07 hrsday
तलगजनज Telangana 24 hoursday 24 hoursday
कनजाटक Karnataka 6 hrsday 6 hrsday
किल Kerala No Restrictions No Restrictions
तममल नजड Tamil Nadu 9 hrsday (6 hrs during day time and 3 hrs during night time) 9 hrsday (6 hrs during day time and 3 hrs during night time)
पडचिी Puducherry No Restrictions No Restrictions
परवी कषतर Eastern Region
बबहजि Bihar About 18 hrsday About 18 hrsday
झजिखणड Jharkhand About 20 hrsday About 20 hrsday
ओडडशज Odisha 24 hrsday 24 hrsday
पशशचम बगजल West Bengal About 23 hrsday About 23 hrsday
28
अकटबर 2018 कषि कषतर को षिदयत आपरति का षििरण Power Supply to Agricultural Sector during October2018
राजय कषतर State Regionऔसत वरवदयत आपरतण घनरो म Average Hours of Supply
On segregated feeders
File NoCEA-CH-14-1142018-Coordination Division
SNo Contents Page
1 Growth of Installed Capacity since 6th Plan 29
2 Progress of Transmission Sector since 6th Plan 30
3 All India Yearly Coal consumption for Power Generation (Utilities)
4 All India Annual Per Capita Consumption of Electricity since -2006
5 Average cost of power supply amp Average realisation (Paisakwh)
6 Growth of Rural Electrification amp Pump Sets Energisation
7 Status of Hydro Schemes Cleared by the CEA in Oct-2018
Section G - Growth of Power Sector
31
32
File NoCEA-CH-14-1142018-Coordination Division
(In MW)
Coal Gas Diesel Total
End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472
End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634
End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537
End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596
End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921
End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703
End of 12th Plan 19216288 2532938 83763 21832988 6780 4447842 50018 31960630
Up to Oct-2018 19599250 2493722 837629 22176734 6780 4548742 7201281 34604757
Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-17) = 51529 MW
Electricity Generation (MU) Targets and Achievements for 2016-17
Coal Gas Diesel Nuclear Hydro Res Total
1959925 2493722 837629 678000 454874 72012805 22925174
29
1 Growth of Installed Capacity Since 6th Plan
Plan YearThermal
Nuclear Hydro RES (MNRE) Total
Total Installed Capacity 34604757 MW
Coal Gas Diesel Nuclear Hydro Res
File NoCEA-CH-14-1142018-Coordination Division
Progress of Transmission Sector in the Country up to Oct 2018
1 TRANSMISSION LINES (All fig in CKM)
At the end of
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
6th plan 0 0 0 0 0 0 0 0 0 0 0 0 1831 4198 0 6029 1641 44364 0 46005 3472 48562 0 52034
7th plan 0 0 0 0 0 0 0 0 0 0 0 0 13068 6756 0 19824 4560 55071 0 59631 17628 61827 0 79455
8th plan 0 0 0 0 1634 0 0 1634 0 0 0 0 23001 13141 0 36142 6564 73036 0 79600 31199 86177 0 117376
9th plan 0 0 0 0 3234 1504 0 4738 751 409 0 1160 29345 20033 0 49378 8687 88306 0 96993 42017 110252 0 152269
10th plan 0 0 0 0 4368 1504 0 5872 1775 409 0 2184 48708 24730 0 73438 9444 105185 0 114629 64295 131828 0 196123
11th Plan 0 0 0 0 5948 1504 1980 9432 4839 411 0 5250 71023 30191 5605 106819 10140 125010 830 135980 91950 157116 8415 257481
12th Plan 6124 0 0 6124 5948 1504 1980 9432 25465 1177 4598 31240 92482 48240 17065 157787 11014 151276 978 163268 141033 202197 24621 367851
13th Plan (Up
to Mar2018)6124 0 0 6124 5948 1504 1980 9432 28666 1512 4881 35059 98247 54286 19067 171600 11258 156497 1000 168755 150243 213799 26928 390970
13th Plan (Up
to Sep-18)6124 0 0 6124 5948 1504 1980 9432 30952 1512 5059 37523 99683 56069 20662 176414 11318 160958 1000 173276 154025 220043 28701 402769
27150
75050
47900
118050
90650
30
IR addition in 12th Plan (up to
March 2017)
Total IR (up to Oct-18)
IR at the end of 11th Plan
IR at the end of 12th Plan
Envisaged IR Capacity at the end
of 13th Plan
Grand Total
Note - The figure upto the end of 10th plan in for stringing progress including the lines not commissioned Now only commissioned lines are reckoned Accordingly the figure for 10th plan (end) may read as 187555 after adjusting with (-) 10852 Ckm
Inter-regional Power Transfer Capacity
plusmn 800 kV HVDC plusmn 500 kV HVDC 765 kV 400 kV 220 kV
File NoCEA-CH-14-1142018-Coordination Division
2004-05 27800
2005-06 28100
2006-07 30200
2007-08 33000
2008-09 35500
2009-10 36700
2010-11 38700
2011-12 41756
2012-13 45460
2013-14 48940
2014-15 53040
2015-16 54590
2016-17 57430
2017-18 60800
Year
2005-06
2006-07
2007-08
2008-09
2009-10
2010-11
2011-12
2012-13
2013-14
2014-15
2015-16
2016-17
2017-18
2004-05 254 209 7568
2005-06 260 221 7636
2006-07 276 227 7423
2007-08 293 239 7727
2008-09 340 263 8713
2009-10 355 268 8870
2010-11 398 303 11975
2011-12 455 330 13514
2012-13 501 376 14867
2013-14 518 175
2014-15 520
6719
7171
3 All India yearly Coal Consumption for Power Generation (Utilities)
YEARCoal Consumption
Million Tonnes
4 All India Annual per Capita consumption of Electricity Since 2006
Per Capita Consumption ( kWh)
6314
(GrossGen+ Net Import) Mid-year population
5 Average cost of power supply amp average realization ( paiseKWH )
Yearcost of supply
(paiseunit)
Realization(paiseunit)
Including AgricultureOnly
Agriculture
1149
7335
7786
91441
8188
88363
957
1010
1075
1122
File NoCEA-CH-14-1142018-Coordination Division
Source- PFC Reports on the performance of State Power Utilities 31
File NoCEA-CH-14-1142018-Coordination Division
Sl
NoExecuting Agency
Installed
Capacity (MW)Cost (Rs crore)
Date of
Clearance
32
No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification
since 2004-05
65291374575 296361511th Plan
Cumu upto End of 11th Plan
596556 21212860
557439Cummulative up to end of 12th Plan
46708
18423975
499150
2003-042004-05
5743
9769
Cumu upto End of 10th Plan
010407 to 310308
010410 to 310311557976840909
010411 to 310312
412667
86293726
3207
482864
12632
1576036
4451722594
15455554
2314176
397343611750
2093311060316074
65109527813884
6 Growth Of Rural Electrification amp Pumpsets Energisation
Plan Year
9th Plan2002-03
134092626
4111
Pump Sets Energised Villages Electricfied (Nos)
2001-02
284064367244
1218
27801997-981998-991999-002000-01
297594
010408 to 310309010409 to 310310
10th Plan
2005-062006-07
322968331020
Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as
Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received
from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made
available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified
villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is
independent of the earlier published reports
No Hydro Electric Project has been issued concurrenceAppraisal letter by CEA during October 2018
7 Status of Hydro Schemes Cleared by the CEA in Oct-2018
Name of Scheme
File NoCEA-CH-14-1142018-Coordination Division
SN Contents Page
1 Rate of sale of power for the year 2016-17 33-41
RATE OF SALE OF POWER FOR THE YEAR 2016-17
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) NORTHERN REGION
CENTRAL SECTOR
BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 18000 66900 19800
CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 54000 222400 21600
CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 30000 144400 19600
CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 23100 91700 42600
PARBATI - III HPS NHPC LTD HYDRO-HYDRO 52000 68200 54800
DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 28000 95600 30000
CHUTAK NHPC LTD HYDRO-HYDRO 4400 22000 79800
DULHASTI HPS NHPC LTD HYDRO-HYDRO 39000 228000 56400
SALAL HPS NHPC LTD HYDRO-HYDRO 69000 342300 11000
TANAKPUR HPS NHPC LTD HYDRO-HYDRO 9420 43000 29600
URI HPS -I NHPC LTD HYDRO-HYDRO 48000 280300 16000
URI HPS - II NHPC LTD HYDRO-HYDRO 24000 147300 48600
NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 4500 24600 88200
SEWA - II NHPC LTD HYDRO-HYDRO 12000 47100 43400
ANTA CCPP NTPC LTD THERMAL-GASN 41930 67539 32400
AURAIYA CCPP NTPC LTD THERMAL-GASN 66336 53501 39100
BADARPUR TPS NTPC LTD THERMAL-COAL 70500 159153 44800
DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 84000 296170 42300
DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 98000 526686 46300
DADRI CCPP NTPC LTD THERMAL-GASHSD 82978 227469 33000
FARIDABAD CCPP NTPC LTD THERMAL-GASN 43159 115577 30800
RIHAND STPS I NTPC LTD THERMAL-COAL 100000 596766 24500
RIHAND STPS II NTPC LTD THERMAL-COAL 100000 737069 24600
RIHAND STPS III NTPC LTD THERMAL-COAL 100000 706546 30600
SINGRAULI STPS NTPC LTD THERMAL-COAL 200000 1394068 20400
TANDA TPS NTPC LTD THERMAL-COAL 44000 295438 40800
UNCHAHAR TPS I NTPC LTD THERMAL-COAL 42000 256454 39800
UNCHAHAR TPS II NTPC LTD THERMAL-COAL 42000 273577 38900
UNCHAHAR TPS III NTPC LTD THERMAL-COAL 21000 142780 43000
KOLDAM NTPC LTD HYDRO-HYDRO 80000 363260 43600
NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 303575 25841
RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 108000 668677 35374
NJHPS SJVNL HYDRO-HYDRO 150000 699496 23820
RAMPUR HPS SJVNL HYDRO-HYDRO 41202 195982 32260
TEHRI HPP THDC HYDRO-HYDRO 100000 272543 51800
KOTESHWAR HEP THDC HYDRO-HYDRO 40000 106244 53400
IGSTPS JHAJJAR ARAVALI P CPL THERMAL-COAL 150000 510429 49490
NEYVELI BARSINGSAR NEYVELI LIG CORP LTD THERMAL-LIG 25000 127520 38040
STATE SECTOR
PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 21000 14222 48200
PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 21000 19205 48400
PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 25000 102257 42600
PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 25000 62107 41800
DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 60000 312213 41000
RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 120000 35767442200
WYC HYDEL STATION HPGCL HYDRO-HYDRO 6240 20365 24900
GIRI POWER HOUSE HPSEB HYDRO-HYDRO 6000 13958 7600
ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 1695 5467 11900
BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 12000 18528 6700
GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 2250 7462 22500
BASSI POWER HOUSE HPSEB HYDRO-HYDRO 6600 29649 7500
BINWA POWER HOUSE HPSEB HYDRO-HYDRO 600 2749 19300
ANNEXURE-I
RATE OF SALE OF POWER FOR THE YEAR 2016-2017
Page 33
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) GAJ POWER HOUSE HPSEB HYDRO-HYDRO 1050 2914 26700
BANER POWER HOUSE HPSEB HYDRO-HYDRO 1200 2864 16200
HOLI POWER HOUSE HPSEB HYDRO-HYDRO 300 616 22500
THIROT POWER HOUSE HPSEB HYDRO-HYDRO 450 1126 22500
KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 1200 3064 22500
LARJI POWER HOUSE HPSEB HYDRO-HYDRO 12600 53677 23700
NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 250 750 31000
CHABA POWER HOUSE HPSEB HYDRO-HYDRO 175 465 23300
RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 150 101 13400
SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 200 000 22500
KILLAR HPSEB HYDRO-HYDRO 030 050 22500
BHABA AUGUMENP H HPSEB HYDRO-HYDRO 450 1276 22500
BS CHAMBA HPSEB HYDRO-HYDRO 045 099 19500
GUMMA HPSEB HYDRO-HYDRO 300 423 22500
GAS TURBINE POWER STATION IPGCL THERMAL-GAS 27000 67233 39300
PPS-I PPCL THERMAL-GAS 33000 175905 38300
PPS-III PPCL THERMAL-GAS 137120 196879 36100
LOWER JHELUM JampKPDD HYDRO-HYDRO 10500 60214 5100
UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 2260 10514 6300
UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 10500 44202 8500
GANDHARBAL JampKPDD HYDRO-HYDRO 1500 8925 4700
KARNAH MPH JampKPDD HYDRO-HYDRO 200 1122 31000
CHENANI I JampKPDD HYDRO-HYDRO 2330 10892 6600
CHENANI II JampKPDD HYDRO-HYDRO 200 1188 9300
CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 750 3634 14200
IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 375 2108 18500
IGO MERCHELLONG JampKPDD HYDRO-HYDRO 300 1572 29700
PAHALGAM MHP JampKPDD HYDRO-HYDRO 450 1713 32900
MARPACHOO JampKPDD HYDRO-HYDRO 075 375 29800
HAFTAL JampKPDD HYDRO-HYDRO 100 483 28700
SANJAK JampKPDD HYDRO-HYDRO 126 441 36000
SEWA-III JampKPDD HYDRO-HYDRO 900 3273 20200
BHADERWAH JampKPDD HYDRO-HYDRO 150 935 8900
BAZGO JampKPDD HYDRO-HYDRO 030 108 33300
SUMOOR JampKPDD HYDRO-HYDRO 010 045 35400
HUNDER JampKPDD HYDRO-HYDRO 040 176 26200
STAKNA JampKPDD HYDRO-HYDRO 400 1933 4100
KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 124000 662879 31360
SURATGARH TPS RRVUNL THERMAL-COAL 150000 402328 41730
CHHABRA TPS 1amp 2 RRVUNL THERMAL-COAL 50000 305946 36700
CHHABRA TPS 3 RRVUNL THERMAL-COAL 25000 151536 36700
CHHABRA TPS 4 RRVUNL THERMAL-COAL 25000 155896 36700
RAMGARH GT POWER PROJECT RRVUNL THERMAL-COAL 22050 43177 41800
RAMGARH GAS T P PROJECT 3 RRVUNL THERMAL-GAS 5000 93615 41800
DHOLPUR C C POWER PROJECT RRVUNL THERMAL-R-LNG 33000 9486 46110
MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 14000 20855 34192
MINI MICRO HYDEL (MMH) P S RRVUNL HYDRO-HYDRO 2385 851 37800
KALISINDH TPP 1 RRVUNL THERMAL-COAL 60000 341543 45000
KALISINDH TPP 2 RRVUNL THERMAL-COAL 60000 211588 45000
KHARA HEP UPJVNL HYDRO-HYDRO 7200 26654 7200
MATATILLA HEP UPJVNL HYDRO-HYDRO 3060 12219 6500
OBRA HEP UPJVNL HYDRO-HYDRO 9900 21517 6300
RIHAND UPJVNL HYDRO-HYDRO 30000 57369 5500
ANPARA A TPS UPRVUNL THERMAL-COAL 63000 317536 27000
ANPARA B TPS UPRVUNL THERMAL-COAL 100000 705605 22700
ANPARA D UPRVUNL THERMAL-COAL 100000 300158 39800
HARDUAGANJ TPS UPRVUNL THERMAL-COAL 16500 45817 49200
HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 50000 304389 46600
OBRA A TPS UPRVUNL THERMAL-COAL 28800 13158 34000
OBRA B TPS UPRVUNL THERMAL-COAL 100000 328124 21900
Page 34
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) PANKI TPS UPRVUNL THERMAL-COAL 21000 66488 50300
PARICHHA TPS UPRVUNL THERMAL-COAL 22000 38762 49400
PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 42000 231931 45600
PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 50000 276722 50400
CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 24000 70845 8290
CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 14400 75366 8390
DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 3375 9595 12080
DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 5100 18701 10520
KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4140 17359 12330
KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 12000 33001 9420
KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 3000 11953 8320
TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 9000 33983 12460
MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 30400 124510 16110
RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 19800 17897 10550
MPUR UTTARAKHAND JVNL HYDRO-HYDRO 930 5121 19200
PATHRI UTTARAKHAND JVNL HYDRO-HYDRO 2040 11636 14200
GALOGI UTTARAKHAND JVNL HYDRO-HYDRO 300 648 12500
PRIVATE SECTOR
MGTPP CLP INDIA PVT LTD THERMAL-COAL 132000 268902 41940
SHRINAGAR HEP ALAKNANDA HPCL HYDRO-HYDRO 33000 127414 48800
GAMA INFRAPROP CCPP GAMA INFRAPROP PVT THERMAL-GAS 22500 52686 47000
PPGCL (BARA) JP POWER VENTURES LTD THERMAL-COAL 198000 448200 38500
MALANA HEP MALANA PCL HYDRO-HYDRO 8600 26354 29792
MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 10000 30369 32580
ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 19200 56347 36079
KASHANG HEP H P PCL HYDRO-HYDRO 19500 5034 29200
BASPA-II HEP HBPCL HYDRO-HYDRO 30000 132769 13600
KARCHAM WANGTOO HEP HBPCL HYDRO-HYDRO 100000 434386 36600
RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 108000 582600 43700
RITHALA COMBI CY POWER PLANT TATA POWER DDL THERMAL-GAS 9480 000 11900
RAJPURA TPS NABHA POWER LTD THERMAL-GAS 140000 901484 39000
TALWANDI SABO POWER LTD TALWANDI SABO POWER LTD THERMAL-COAL 198000 636040 49548
ROJA THERMAL POWER STATION ROJA POWER SCL THERMAL-COAL 120000 727200 43400
KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 34400 63400
BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 36000 62600
MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 38200 60800
UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 37900 61500
KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 42300 58800
LALITPUR PGCL BAJAJ ENERGY PVT LTD THERMAL-COAL 198000 359400 47300
PRAYAGRAJ PGCL PRAYAGRAJ PGCL THERMAL-COAL 132000 448200 38595
KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 132000 783182 33438
WESTERN REGION
CENTRAL SECTOR
INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 100000 325333 23892
OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 52000 141663 34001
GANDHAR CCPP NTPC LTD THERMAL-GAS 65739 221924 28700
KAWAS CCPP NTPC LTD THERMAL-GASN 65620 167929 27000
KORBA I amp II NTPC LTD THERMAL-COAL 210000 1499171 20500
KORBA III NTPC LTD THERMAL-COAL 50000 358746 26600
SIPAT STPS I NTPC LTD THERMAL-COAL 198000 1479902 26800
SIPAT STPS II NTPC LTD THERMAL-COAL 100000 766549 26500
VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 126000 693142 25800
VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 100000 608781 23800
VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 100000 673475 27600
VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 100000 655924 32900
VINDHYACHAL STPS V NTPC LTD THERMAL-COAL 50000 328265 31700
MOUDA I NTPC LTD THERMAL-COAL 100000 343130 44500
MOUDA Ii NTPC LTD THERMAL-COAL 66000 40637 39900
RATNAGIRI GAS amp POWER PVT LTD RGPPL THERMAL-GAS 196708 442485 47000
KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 000 24729
TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 32000 201227 10740
Page 35
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 365122 19069
TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 787444 29324
STATE SECTOR
GSEG-HAZIRA15610 MW GUJARAT S ENEGEN LTD THERMAL-GAS 15610 1805 28200
GSEG-HAZIRA35143 MW GUJARAT S ENEGEN LTD THERMAL-GAS 35130 22276 51300
GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 21978 51800
AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 13929 26100
KORBA TPS EAST CSPGCL THERMAL-COAL 44000 198673 33880
DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 365808 27570
KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 316500 30420
HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 532878 19410
CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 515 58300
MTTPS CHAMPA U-I CSPGCL THERMAL-COAL 50000 220376 39000
MTTPS CHAMPA U-II CSPGCL THERMAL-COAL 50000 23709 10000
SHP GANGREL CSPGCL HYDRO-HYDRO 1000 2350 36790
BANGO HEP CSPGCL HYDRO-HYDRO 12000 14662 8900
MHP KORBA WEST CSPGCL HYDRO-HYDRO 170 859 38190
SIKASAR HEP CSPGCL HYDRO-HYDRO 700 418 26870
DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8843 74500
DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 19446 51500
GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 66388 71600
GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127488 41300
KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 96072 43900
KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 29841 56400
SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 184966 58800
UKAI 1-5 GSECL THERMAL-COAL 85000 204891 46900
UKAI TPS 6 GSECL THERMAL-COAL 50000 284448 48200
WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 271999 58300
WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 82808 44100
KADANA HPS GSECL HYDRO-HYDRO 24200 34433 16800
UKAI HPS GSECL HYDRO-HYDRO 30500 40585 6100
TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 123000 11500
BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 8900 10900
BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 7200 27500
JHINNA HPS MPPGCL HYDRO-HYDRO 2000 9700 18500
RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 44300 3400
GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 17300 4600
SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 4100 16900
MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 14600 27000
PENCH HPS MPPGCL HYDRO-HYDRO 16000 23700 8100
RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 3000 16900
AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 134400 35100
SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 283800 38700
SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 344600 34300
SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 111600 61600
SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 211800 58000
SSTPS PH-I MPPGCL THERMAL-COAL 120000 233100 84300
BHUSAWAL TPS MSPGCL THERMAL-COAL 142000 566258 51100
CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1365682 33700
KHAPERKHEDA MSPGCL THERMAL-COAL 134000 706207 39100
KORADI TPS MSPGCL THERMAL-COAL 62000 443206 42000
NASIK TPS MSPGCL THERMAL-COAL 63000 297275 47000
PARLI TPS MSPGCL THERMAL-COAL 113000 175934 71600
PARAS MSPGCL THERMAL-COAL 50000 267931 38700
URAN CCPP MSPGCL THERMAL-GAS 67200 320330 30600
KOYANA MSPGCL HYDRO-HYDRO 195600 328155 13100
SMALL HYDRO POWER PLANTS MSPGCL HYDRO-HYDRO 45400 93062 30500
BHIRA MSPGCL HYDRO-HYDRO 8000 10046 8400
TILLARI MSPGCL HYDRO-HYDRO 8900 10584 3100
SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 233298 20500
SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 87633 20500
PRIVATE SECTOR
Page 36
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 81282 46750
JNSTPP(JAYPEE NIGRIE) JP POWER VENTURES LTD THERMAL-COAL 132000 726695 29310
MB POWER MB POWER THERMAL-COAL 120000 345632 38310
ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 754922 28671
ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 780761 23495
ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 198000 1263784 32090
ADANI POWER MAHARA ADANI POWER LTD THERMAL-COAL 330000 1666191 34124
AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 170065 36827
SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 252035 45129
ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 458551 36000
ESSAR POWER MP LTD ESSAR POWER MP LTD THERMAL-COAL 60000 243040 28600
VEDANTA LTD (P P -I) VEDANTA LTD THERMAL-GAS 3000 15044 24000
VEDANTA LTD (P P -II) VEDANTA LTD THERMAL-GAS 3000 21293 24000
PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 8234600 24000
165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 5850 64390
145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 68717 40349
SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 132655 28776
SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 144686 38567
MUNDRA UMPPCOASTAL GUJARAT POWER
LTD THERMAL-IMP COAL 400000 2530300
23900
LANCO AMARKANTAK TPP PATHADIH
U-ILANCO AMARKAN POWER LTD THERMAL-COAL 30000 195500
29200
LANCO AMARKANTAK TPP PATHADIH
U-IILANCO AMARKAN POWER LTD THERMAL-COAL 30000 206900
27600
BARADARHA TPS D B POWER LTD THERMAL-COAL 120000 677373 29200
JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 405000 28900
JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 453000 40500
DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 339437 40700
TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 293400 44000
TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 137200 37000
TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 174900 44000
BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 92900 14100
BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23700 34300
KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 27600 48300
CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2530300 23900
BHANDARDRA HEP -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 2475 54900
SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 161400 26500
SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 445000 39000
SOTHERN REGION
CENTRAL SECTOR
NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 325699 54820
NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 305532 39880
NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 998805 38510
NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 113016 54070
NEYVELI TAMILNADU POWER LTD JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 625274 42200
VALLUR TPS NTPC TECL THERMAL-COAL 150000 856438 42350
R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 1493 84300
RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1502919 29400
RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 341291 31800
SIMHADRI I NTPC LTD THERMAL-COAL 100000 688382 36800
SIMHADRI II NTPC LTD THERMAL-COAL 100000 663657 43400
KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 593110 31324
MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 291625 21764
KKNPP-1 amp 2 NPCIL NUCLEAR-NUCLEAR 200000 572609 40948
MINICOY LAKSHADEEP THERMAL-DIESEL 340 770 29600
KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1097 29600
AMINI LAKSHADEEP THERMAL-DIESEL 265 509 29600
ANDROTT LAKSHADEEP THERMAL-DIESEL 219 524 29600
KALPENI LAKSHADEEP THERMAL-DIESEL 175 356 29600
AGATTI LAKSHADEEP THERMAL-DIESEL 195 658 29600
KADMAT LAKSHADEEP THERMAL-DIESEL 190 414 29600
KILTAN LAKSHADEEP THERMAL-DIESEL 150 269 29600
CHETLET LAKSHADEEP THERMAL-DIESEL 100 139 29600
BITRA LAKSHADEEP THERMAL-DIESEL 043 024 29600
BANGARAM LAKSHADEEP THERMAL-DIESEL 018 009 29600
Page 37
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) STATE SECTOR
Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 721811 46500
Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 50000 336142 46500
RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 237358 46500
RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 239926 46500
RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 124500 46500
SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 62109 46500
UPPER SILERU APGENCO HYDRO-HYDRO 24000 33000 46500
LOWER SILERU APGENCO HYDRO-HYDRO 46000 81066 46500
DONKARAI APGENCO HYDRO-HYDRO 2500 6007 46500
PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 1262 46500
CHETTIPETA APGENCO HYDRO-HYDRO 100 214 46500
MUCHKUND APGENCO HYDRO-HYDRO 12000 37571 46500
NAGARJUNASAGAR RCPH APGENCO HYDRO-HYDRO 9000 606 46500
TUNGABHADRA HES amp HAMPI(AP
Share)
APGENCO HYDRO-HYDRO 7200 6100 46500
KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 352232 42600
KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 288131 32500
KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 319272 46500
RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 40073 44300
KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 308317 46000
KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 308963 51300
SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 61004 76600
NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 17960 75300
PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 20873 58300
POCHAMPAD-I TSPGENCO HYDRO-HYDRO 2700 5455 29800
POCHAMPAD-II TSPGENCO HYDRO-HYDRO 900 1932 40700
NIZAMSAGAR TSPGENCO HYDRO-HYDRO 1000 1126 53400
RAICHUR TPS 1 to 7 KPCL THERMAL-COAL 147000 890866 43800
RAICHUR TPS 8 KPCL THERMAL-COAL 25000 159523 48200
BELLARI TPS 1 KPCL THERMAL-COAL 50000 318679 51100
BELLARI TPS 2 KPCL THERMAL-COAL 50000 232347 55600
BELLARI TPS 3 KPCL THERMAL-COAL 70000 47565 34400
BHADRA PH KPCL HYDRO-HYDRO 3920 2369 45900
GERUSUPPA PH KPCL HYDRO-HYDRO 24000 26990 22000
GHAT PRABHA HEP KPCL HYDRO-HYDRO 3200 4777 25300
KADRA HPS KPCL HYDRO-HYDRO 15000 16889 26800
NAGJHARI KPCL HYDRO-HYDRO 90000 155159 9800
KODASALLI DPH KPCL HYDRO-HYDRO 12000 14854 19200
MUNIRA+MGH+SPH+SPH KPCL HYDRO-HYDRO 22640 48211 7900
SHARAVATHY HPS KPCL HYDRO-HYDRO 108550 276215 5400
ALMATTI DPH KPCL HYDRO-HYDRO 29000 39611 24600
VARAHI UGPH KPCL HYDRO-HYDRO 46000 71368 15600
IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 17196 15300
IDUKKI HPS KSEB HYDRO-HYDRO 78000 137905 15300
KAKKAD HPS KSEB HYDRO-HYDRO 5000 13063 15300
KALLADA HPS KSEB HYDRO-HYDRO 1500 4436 15300
KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 46544 15300
KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 635 15300
LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 30822 15300
MALANKARA HPS KSEB HYDRO-HYDRO 1050 2474 15300
MATTUPETTY KSEB HYDRO-HYDRO 200 230 15300
MALAMPUZHA KSEB HYDRO-HYDRO 250 063 15300
CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 864 15300
URUMI ST I amp II KSEB HYDRO-HYDRO 615 903 15300
LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 248 15300
NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7765 19625 15300
PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 16601 15300
PANNIAR HPS KSEB HYDRO-HYDRO 3240 6217 15300
PORINGALKUTHU KSEB HYDRO-HYDRO 3600 10052 15300
PORINGALKUTHU LBE KSEB HYDRO-HYDRO 1600 9438 15300
PEPPARA KSEB HYDRO-HYDRO 300 395 15300
POOZHITHODE KSEB HYDRO-HYDRO 480 1045 15300
Page 38
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) PEECHI KSEB HYDRO-HYDRO 125 040 15300
RANI-PERUNADU KSEB HYDRO-HYDRO 400 585 15300
SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 79783 15300
SENGULAM HPS KSEB HYDRO-HYDRO 5120 11558 15300
SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 16711 15300
VILANGAD KSEB HYDRO-HYDRO 750 1578 15300
BARAPOLE KSEB HYDRO-HYDRO 1500 1932 15300
VELLATHOOVAL KSEB HYDRO-HYDRO 360 305 15300
CHIM0NY KSEB HYDRO-HYDRO 250 156 15300
ADYANPARA KSEB HYDRO-HYDRO 350 501 15300
BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 554 15300
KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 3801 15300
KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 23132 32800
ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 14416 62280
METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 523970 62280
METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 321270 62280
NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 336575 62280
NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 591240 62280
TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 508966 62280
KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 30897 62280
VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 18720 90699 62280
KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 33593 62280
BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 1047 62280
PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 1250 62280
PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 330 62280
MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 4897 62280
MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 032 62280
KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15681 62280
KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 40608 62280
KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 21342 62280
KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 4717 62280
KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4322 62280
KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2399 62280
METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 4416 62280
METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 8035 62280
BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2187 62280
BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2359 62280
BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2511 62280
BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 1949 62280
BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 1819 62280
POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 172 62280
SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 241 62280
MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 026 62280
THIRUMOORTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 136 62280
PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 9309 62280
VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 353 62280
SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 4192 62280
PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 6571 62280
SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 1186 62280
SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6319 62280
ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 6122 62280
KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 28674 62280
SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 18381 62280
SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 4258 62280
KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 12680 62280
KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4201 62280
ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 000 62280
PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 19175 62280
AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 078 62280
BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 504 62280
BHAVANI KATTALAI (BKB)(IIIampIII BB I amp II)TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 5847 62280
PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 000 62280
Page 39
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) SRI DAMODARAM STPS APPDCL THERMAL-COAL 160000 808108 36300
PRIVATE SECTOR
KARUPPUR TANJORE LANCO TANJORE PCL THERMAL-GAS 12000 48096 28770
SIMHAPURI ENERGY LTD SIMHAPURI ENERGY LTD THERMAL-COAL 60000 143900 39100
JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 7111 45500
SBU 1 JSW ENERGY LTD
VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 26000 159100
43300
SBU 2 JSW ENERGY LTD
VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 60000 247900
42800
LANCO KPLLANCO KONDAPALLI POWER
LTDTHERMAL-GAS 36814 85060
25776
LANCO KPL STG -IILANCO KONDAPALLI POWER
LTDTHERMAL-GAS 36600 12979
46330
LANCO KPL STG -IIIALANCO KONDAPALLI POWER
LTDTHERMAL-GAS 37100 85710
46330
LANCO KPL STG -III BLANCO KONDAPALLI POWER
LTDTHERMAL-GAS 37100 43639
46330
HINDUJA NATIONAL PCL HINDUJA NATIONAL PCL THERMAL-COAL 104000 303000 38200
MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 121164 49940
UDUPI POWER COR LTD ADANI POWER LTD THERMAL-COAL 120000 754613 42500
SPECTRUM POWER GENERATION
LTD SPECTRUM PG LTD THERMAL-GASN 20525 9256812
34952
TAQA NEYVELI POWER COM PVT
LTD TAQA NEYVELI THERMAL-LIG 25000 5840
34500
ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 251000 51000
ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 207860 36800
GMR VEMAGIRI POWER GENERATION
LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 30117
46450
EASTERN REGION
CENTRAL SECTOR
MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 64675 53113
MTPS STAGE - II KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 39000 1432 69138
BOKARO `B` TPS DVC THERMAL-COAL 63000 145670 31539
MEJIA TPS U 1-3 DVC THERMAL-COAL 63000 348298 31552
MEJIA TPS U 4 DVC THERMAL-COAL 21000 116099 34997
MEJIA TPS U 5-6 DVC THERMAL-COAL 50000 276427 35976
MEJIA TPS U 7-8 DVC THERMAL-COAL 100000 552854 36991
DURGAPUR STEEL TPS DVC THERMAL-COAL 100000 665550 39323
DURGAPUR TPS DVC THERMAL-COAL 21000 59270 35416
RAGHUNATHPUR TPS DVC THERMAL-COAL 120000 201650 35326
MAITHON HYDEL STA DVC HYDRO-HYDRO 6320 12200 17984
CHANDRAPURA TPSU1-3 DVC THERMAL-COAL 42000 257610 35095
CHANDRAPURA TPSU7-8 DVC THERMAL-COAL 50000 306673 34987
KODERMA TPS DVC THERMAL-COAL 100000 380180 38131
PANCHET HPS DVC HYDRO-HYDRO 8000 13360 17984
TILLAYA HPS DVC HYDRO-HYDRO 400 1410 17984
RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34700 35400
TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 277300 23200
TLDP -III NHPC LTD HYDRO-HYDRO 13200 55400 62000
TLDP -IV NHPC LTD HYDRO-HYDRO 16000 60300 25600
FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 957219 33700
FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 308943 41000
BONGAINGAON TPS NTPC LTD THERMAL-COAL 25000 153663 58600
KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 542277 34200
KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 942591 34200
BARH-II NTPC LTD THERMAL-COAL 132000 728021 44500
TALCHER TPS NTPC LTD THERMAL-COAL 46000 335521 30100
TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 702319 25600
TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1436521 24700
STATE SECTOR
BTPS(RampM) BIHAR STATE PGCL THERMAL-COAL 22000 12142 39700
BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 98331 10602
HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 50593 9482
CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 19689 2605
RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 53192 6033
UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 147208 14637
Page 40
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 60353 4519
IB TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 288567 25000
J P H GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 210 038 61100
MEYONG CHU GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 400 1086 61100
TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 122667 38200
DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 214339 43321
KOLAGHAT THERMAL POWER
STATION
WEST BENGAL PDCL THERMAL-COAL 126000 538269 31603
BAKRESHWAR THERMAL POWER
PLANT
WEST BENGAL PDCL THERMAL-COAL 105000 634876 32154
BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 45000 166855 33299
SANTHALDIH THERMAL POWER
STATION
WEST BENGAL PDCL THERMAL-COAL 50000 336442 34932
SAGARDIGHI THERMAL POWER
PROJECT
WEST BENGAL PDCL THERMAL-COAL 160000 423121 34705
JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 20344 68900
RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 24559 68900
TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 4623 68900
PURULIA PUMPED STORAGE
PROJECT
WEST BENGAL SEDCL HYDRO-HYDRO 90000 108816 68900
MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2768 68900
PRIVATE SECTOR
CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 49474 20230
CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 555500 70200
HALDIA ENERGY HALDIA ENERGY LTD THERMAL-COAL 60000 371000 50400
DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3688 63400
KAMALANGA TPS GMR KAMALANGA ENERGY LTD THERMAL-COAL 105000547670
33300
ADHUNIK POWER U-1 ADHUNIK POWER THERMAL-COAL 27000 158 44060
ADHUNIK POWER U-2 ADHUNIK POWER THERMAL-COAL 27000 168 44250
VL-JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 332800 23622
JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 43000 45250
JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 71700 37030
JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 70700 35920
JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 71100 38870
JOJOBERA UNIT 5 TATA POWER COM LTD THERMAL-COAL 12000 79300 44560
JOJOBERA UNIT 6 TATA POWER COM LTD THERMAL-WHR 12000 83700 12840
IEL KALINGANAGAR U-I TATA POWER COM LTD THERMAL-WG 6750 33400 22500
IEL KALINGANAGAR U-II TATA POWER COM LTD THERMAL-WG 6750 34800 22500
MAITHON UNIT 1 amp 2 TATA POWER COM LTD THERMAL-COAL 105000 678000 36100
HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 27500 24340
HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 28400 24340
HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 15800 24310
NORTH EASTERN REGION
CENTRAL SECTOR
LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 74100 36600
AGARTALA GT NEEPCO THERMAL-GAS 13500 88611 27210
ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 153111 32310
DOYANG HEP NEEPCO HYDRO-HYDRO 7500 25598 49801
KOPILI HEP NEEPCO HYDRO-HYDRO 20000 98186 11491
KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 19582 20237
KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 10310 17968
RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 124093 22945
TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 10100 17344 39000
STATE SECTOR
HYDRO POWER (122 Stns) ITANAGAR GOVT OF ARUNACHAL
PRADESHHYDRO-HYDRO 6971 6217270
24600
KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39514 17337
LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 82327 36810
NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 33318 48290
MYNTRIANG SHEP ST II ASSAM POWER GENCO HYDRO-HYDRO 300 567 35776
LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 9130 49200
LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 012 49200
DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 022 49200
TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 000 49200
UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 4990 16000
UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 6476 37000
UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 16494 14600
UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 3600 9556 15000
SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 758 8000
MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44070 44800
KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 154 41400
TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 091 41400
MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 411 41400
MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 394 41400
KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 760 41400
SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 3264 41400
LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 044 41400
BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 18953 28000
ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 43585 28200
GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 4080 11100
Note
LIG Lignite N Naptha WHR Waste Heat Recovery
Page 41
File NoCEA-CH-14-1142018-Coordination Division
(i)
(ii)
(iii)
Nuclear Hydro RES Grand TotalRegion Coal Gas Diesel Total
Northern 5128020 578126 000 5706146 162000 1970777 1363391 9202314
Western 7120862 1080649 000 8201511 184000 754750 2102418 11242679
Southern 4578202 647366 76158 5301726 332000 1183803 3597107 10414636
Eastern 2720164 10000 000 2730164 000 494212 108364 3332740
North-East 52002 177581 3600 233183 000 145200 28745 407128
Islands 000 000 4005 4005 000 000 1256 5261
ALL INDIA 19599250 2493722 83763 22176734 678000 4548742 7201281 34604757
Note Captive Genaration is not included in the total Captive Power capacity as on 31032017 RES as on 30092018 3
Thermal
Nuclear
3 List of Projects Commissioned During Oct-2018
4 All India Installed Capacity (MW) Region-wise as on 31-10-18
Mahan TPP of Essar Power MP ltd of capacity 600 MW was commissioned on 07102018
NIL
Thermal
NIL
Hydro
22176734
678000
4548742
7201281
34604757
51529
000
5000000
10000000
15000000
20000000
25000000
30000000
35000000
40000000
Thermal Nuclear Hydro RES Total Captive
Thermal Nuclear Hydro RES Total Captive
Total = 34604757
File NoCEA-CH-14-1142018-Coordination Division
Sector
Coal Gas Diesel Total
State 6359650 711871 36393 7107913 000 2994200 200887 10303000
Private 7614600 1058060 47370 8720030 000 339400 6850164 15909594
Central 5625000 723791 000 6348791 678000 1215142 150230 8392163
All India 19599250 2493722 83763 22176734 678000 4548742 7201281 34604757
State 10303000
Private 15909594
Central 8392163
Electricity Generation (MU) Targets and Achievements for 2016-17
5 All India Installed Capacity (MW) Sector-wise as on 31-10-18
4
Grand TotalTHERMAL
Nuclear Hydro RES
RES as on 30092018
State 10303000 30
Private 15909594 46
Central 8392163 24
All India Installed Capacity(MW) as on 31-10-2018 (Sector-Wise)
File NoCEA-CH-14-1142018-Coordination Division
Voltage Level
+- 500 KV HVDC
+- 800 KV HVDC
765 KV
400 KV
220 KV
All India
Voltage Level
+- 500 KV HVDC
+- 800 KV HVDC
765 KV
400 kV
220 KV
All India
5
0 0
6 Transmission Lines Added during Oct-2018 (Ckms)
Oct-17 Oct-18
0 0
0 0
0 729
245 737
324 401
569 1867
Transmission Lines Added duringApril 2017- Oct 2017 ampApril 2018- Oct 2018 (Ckms)
April 2017- Oct 2017 April 2018- Oct 2018
2151 4521
13120 11799
0 0
2046 2464
8923 4814
569
1867
0
500
1000
1500
2000
All India
Ckm
s
Oct-17 Oct-18
13120
11799
11000
11500
12000
12500
13000
13500
All India
Ckm
s
April 2017- Oct 2017 April 2018- Oct 2018
File NoCEA-CH-14-1142018-Coordination Division
Voltage Level
+- 800 KV HVDC
+- 500 KV HVDC
765 KV
400 KV
220 KV
All India
Voltage Level
+- 800 KV HVDC
+- 500 KV HVDC
765 KV
400 KV
220 KV
All India
6
7 Transformation Capacity Addition During Oct-2018 (MVA)
0
0
2575
1025
0 0
Oct-17 Oct-18
3600
0
3000
9840
4620
2220
3000 0
All India Transformation Capacity Addition during April 2017- Oct 2017 amp April
2018- Oct 2018 (MVA)
41790
0
14000
17180
10610
45665
10000
23020
9645
0
April 2017- Oct 2017 April 2018- Oct 2018
3600
9840
0
2000
4000
6000
8000
10000
12000
MV
A
Oct-17 Oct-18
4566541790
0
74520
1
MV
A
April 2017- Oct 2017 April 2018- Oct 2018
File NoCEA-CH-14-1142018-Coordination Division
Oct-2017 Oct-2018 Oct-2017 Oct-2018 Oct-2017 Oct-2018
Northern 31786 31822 31096 31375 -22 -14
Western 31728 36308 31628 36178 -03 -04
Southern 24314 29392 24271 29342 -02 -02
Eastern 12012 12547 11931 12507 -07 -03
North Eastern 1487 1387 1451 1351 -24 -25
All India 101327 111455 100377 110753 -09 -06
Oct-2017 Oct-2018 Oct-2017 Oct-2018 Oct-2017 Oct-2018
Northern 51307 50659 50289 49635 -20 -20
Western 48530 56548 46392 55695 -44 -15
Southern 39142 45279 38905 45226 -06 -01
Eastern 19850 22959 19836 22567 -01 -17
North Eastern 2596 2790 2499 2700 -37 -32
All India 162027 172945 157394 170604 -29 -14
Oct-2018 Figures are Provisional
7
8 Power Supply Position (Energy amp Peak) in Oct-2018
Peak Demand Peak Met
Requirement Availability
Energy (MU)Region
Surplus(+)
Deficit (-) in
Surplus(+)
Deficit (-) in Region
Power (MW)
File NoCEA-CH-14-1142018-Coordination Division
Chandigarh Delhi Haryana HP JampK Punjab Rajasthan UP Utrakhand Oct-2017 0 0 0 0 516 0 0 0 0
Oct-2018 0 0 0 0 567 0 0 688 0
Chattisgarh Gujarat MP Maharastra Daman amp Diu Dadar Nagar Goa
Oct-2017 16 0 13 2062 0 0 25
Oct-2018 146 19 39 705 1 4 0
AP Telangana Karnataka Kerala Tamil Nadu Puducherry Lakshadweep
Oct-2017 18 19 0 211 38 2 0
Oct-2018 0 0 0 83 414 1 0
8
9 Peak Shortage of Power Supply (MW) in Different Regions in Oct-2018
0 0 0 0
567
0 0
688
00 0 0 0
516
0 0 0 0
0
400
800
Chan
dig
ar
h
Delh
i
Hary
ana
HP
Jamp
K
Pu
nj
ab
Raja
sth
an
UP
Utr
ak
hand
MW
Northern States (MW) Oct-2018 Oct-2017
146
19
39 705
1 4 016
0 13
2062
0 0 25
0
5000
Ch
attis
garh
Guja
rat
MP
Mah
ara
st
ra
Da
man amp
Diu
Da
dar
Na
gar G
oaM
W
Western States (MW) Oct-2018 Oct-2017
0 0 083
414
1 018 19 0
211
38 2 00
500
AP Telangana Karnataka Kerala Tamil Nadu Puducherry Lakshadweep
Southern State (MW) Oct-2018 Oct-2017
File NoCEA-CH-14-1142018-Coordination Division
Bihar DVC Jharkhand Odisha West Bengal Sikkim AampN Island
Oct-2017 6 0 0 0 8 0 4
Oct-2018 0 0 0 400 0 0 4
Arunachal Assam Manipur Meghalaya Mizoram Nagaland Tripura
Oct-2017 6 77 4 0 2 2 12
Oct-2018 13 81 2 0 2 3 0
9
0 0 0
400
0 0 46 0 0 0 8 0 4
0100200300400500
Bih
ar
DV
C
Jha
rkh
an
d
Od
ish
a
We
st
Be
ng
al
Sik
kim
Aamp
NIs
land
MW
Eastern States (MW) Oct-2018 Oct-2017
13
81
2 0 2 3 06 4 0 2 2
12
0
100
Aru
na
ch
al
Assa
m
Ma
nip
ur
Meghal
aya
Miz
ora
m
Na
gala
nd
Trip
ura
MW
North-Eastern States (MW)
File NoCEA-CH-14-1142018-Coordination Division
Sector Oct-2017 Oct-2018
Central 6872 7355
State 5217 6078
Private 6045 6819
ALL INDIA 5882 6524
Month PLF 2017 PLF 2018
Jan 6014 6288
Feb 6153 6285
March 6313 6558
April 6493 6458
May 6355 6554
June 5672 5917
July 537 5545
Aug 5733 5639
Sep 5989 6109
Oct 5882 6524
For Coal and Lignite based Power Plants and Provisional based on Actual-Cum-Assesment
10
PLF of Thermal Power Plants
All India PLF of Thermal Plants (Excluding Gas Based Plants) Month-wise
10 All India PLF Sector-wise for Oct-2018
68
72
52
17
60
45
58
8273
55
60
78
68
19
65
24
000
1000
2000
3000
4000
5000
6000
7000
8000
Central State Private ALL INDIA
P
LF
Oct-2017 Oct-2018
0
10
20
30
40
50
60
70
Jan Feb March April May June July Aug Sep Oct
Months
All India PLF Month-wise
PLF 2017 PLF 2018
File NoCEA-CH-14-1142018-Coordination Division
2012-13 2013-14 2014-15 2015-16 2016-17
TampD Losses 2304 2284 2277 2181 2142
ATampC Losses 2548 2258 2462
Note As per PFC for utilities selling directly to consumers
Total Number of Villages
597464
Note From the year 2004-05 onwards Definition of Village Electrification-
A village would be declared Electrified if
Without
Subsidy
Gap ACS-
ARR(
Without
Subsidy)
Paiseunit
Gap ACS-
ARR (on
subsidy
booked
basis)
paiseunit
Gap ACS-
ARR (on
subsidyrece
ived basis)
paiseunit
2013-14 400 118 76 77
2014-15 412 108 58 60
Source- PFC Reports on the performance of State Power Utilities
2013-14 4894
2014-15 5304
2015-16 5459
2016-17 5743
2017-18 6080
11
Average cost of supply(ACS)
(paiseunit)
i) Basic Infrastructure such as Distribution Transformer and Distribution lines are provided in the inhabited locality
as well as Dalit Basti hemlet where it exists (For electrification through Non-Conventional Energy Sources a
Distribution Transformer may not be necessary)
14 All India Coal consumption for Power Generation (MT)
520
Average Revenue Realization(paiseunit)
518
Year
ii) Electricity is provided to Public places like Schools Panchayat Office Health Centre Dispensaries Community
Centres etc and
iv) Mandatory Certification from Gram Panchayat regarding the completion of village electrification should be
obtained
13 Average cost of Power amp Average Realisation
iii) The number of households electrified should be at least 10 of the total number of households in the village
11 T amp D and ATampC Losses ()
12 All India Village Electrification
Villiages Electrified (Nos)
10000All villages as per census 2011 has
been electrified on 28042018
Villages electrified
File NoCEA-CH-14-1142018-Coordination Division
SN Contents Page
1 Capacity Addition Targets and Achievements in 12th Plan 12
2 Capacity Addition Targets amp Achievements during Oct-2018 and April 2018- Oct 2018 13
3 Installed Capacity in various Regions including their shares 14-19
Section B - Capacity Addition
File NoCEA-CH-14-1142018-Coordination Division
Figures in MW
TARGET ACH TARGET ACH TARGET ACH TARGET ACH
CENTRAL 14878 15869 6004 2584 5300 2000 26182 20453
STATE 13922 22201 1608 2276 0 0 15530 24477
PRIVATE 43540 53661 3285 619 0 0 46825 54280
ALL INDIA 72340 91730 10897 5479 5300 2000 88537 99209
Figures in MW
Thermal Hydro Nuclear Total
Target Ach Target Ach Target Ach Target Ach
Central 4880 3170 800 390 500 6180 3560 5761
State 3546 1760 300 200 0 3846 1960 5096
Private 2940 3780 205 205 0 3145 3985 12671
Total 11366 8710 1305 795 500 0 13171 9505 7217
12
2 CAPACITY ADDITION TARGET AND ACHIEVEMENT FOR 2017-18 (IN MW)
1 Capacity Addtion Targets and Achievements in the 12th Plan
SECTORTHERMAL HYDRO NUCLEAR TOTAL
File NoCEA-CH-14-1142018-Coordination Division
(MW)
Cummulative
Deviation
Target Achievement Target Achievement (+) (-)
Central 2760 250 0 250 0 -250
State 450615 1030 0 1030 69755 -960245
Private 0 0 600 0 600 600
Total 726615 1280 600 1280 669755 -610245
Central 710 0 0 110 110 0
State 130 0 0 12999 30 -9999
Private 0 0 0 0 0 0
Total 840 0 0 23999 140 -9999
Nuclear Central 0 0 0 0 0 0
Central 3470 250 0 360 110 -250
State 463615 1030 0 115999 99755 -1060235
Private 0 0 600 0 600 600
Total 810615 1280 600 151999 809755 -710235
Electricity Generation (MU) Targets and Achievements for 2016-17
13
2 Capacity Addition Targets Achievements During Oct-2018
Schemes Sector
Target 2018-19
April 2018- Oct 2018Oct-18
Hydro
All India
Capacity Addition TargetsAchievements during the Month of Oct-2018
Thermal
12
80
24
0
0
15
20
67
0
14
0
0
81
0
0
200
400
600
800
1000
1200
1400
1600
Thermal Hydro Nuclear Total
MW
Targets and Achievement during 2018-19Target Achievement
600
0 00 0
600
0
100
200
300
400
500
600
700
800
900
1000
Target Achievement
MW
Targets and Achievement during Oct 2018Thermal Hydro
Nuclear Total
File NoCEA-CH-14-1142018-Coordination Division
Coal Gas Diesel Total
State 1593400 287920 000 1881320 000 869755 68956 2820031
Private 2276083 55800 000 2331883 000 251400 1261535 3844818
Central 1258537 234406 000 1492943 162000 849622 32900 2537465
Sub Total 5128020 578126 000 5706146 162000 1970777 1363391 9202314
State 2128000 284982 000 2412982 000 544650 31119 2988751
Private 3488567 467600 000 3956167 000 48100 2005170 6009437
Central 1504295 328067 000 1832362 184000 162000 66130 2244492
Sub Total 7120862 1080649 000 8201511 184000 754750 2102418 11242679
State 1943250 79198 28788 2051236 000 1183803 52102 3287141
Private 1212450 532210 47370 1792030 000 000 3495815 5287845
Central 1422502 35958 000 1458460 332000 000 49190 1839650
Sub Total 4578202 647366 76158 5301726 332000 1183803 3597107 10414636
State 695000 10000 000 705000 000 353792 22511 1081303
Private 637500 000 000 637500 000 39900 84853 762253
Central 1387664 000 000 1387664 000 100520 1000 1489184
Sub Total 2720164 10000 000 2730164 000 494212 108364 3332740
State 000 49771 3600 53371 000 42200 25674 121245
Private 000 2450 000 2450 000 000 2571 5021
Central 52002 125360 000 177362 000 103000 500 280862
Sub Total 52002 177581 3600 233183 000 145200 28745 407128
State 000 000 4005 4005 000 000 525 4530
Private 000 000 000 000 000 000 221 221
Central 000 000 000 000 000 000 510 510
Sub Total 000 000 4005 4005 000 000 1256 5261
State 6359650 711871 36393 7107913 000 2994200 200887 10303000
Private 7614600 1058060 47370 8720030 000 339400 6850164 15909594
Central 5625000 723791 000 6348791 678000 1215142 150230 8392163
Total 19599250 2493722 83763 22176734 678000 4548742 7201281 34604757
Figures at decimal may not tally due to rounding off
Note -
(As per latest information available with MNRE)
Break up of RES all India as on 30092018 is given below (in MW)
450695 3461510 2402166 7201281
A Oct 2018 669755 MW
B Capacity Retired
during
Oct 2018 705 MW
C Oct 2018 0 MW
D Oct 2018 A-B+C -35245 MW
Share of Telangana from JEGURUPADU CCPP Ph II has been removed and the same has been added to private sector of Andhra Pradesh due to expiry of PPA as per
request from TS Transco
Region
ALL INDIA INSTALLED CAPACITY (IN MW) OF POWER STATIONS (As on 31102018)
(UTILITIES)
Net Capacity Added during
1 RES include SHP BP UampI Solar and Wind Energy Installed capacity in respect of RES (MNRE) as on 30092018
Small
Hydro PowerWind Power
Bio-PowerSolar Power
Total
CapacityBM PowerCogen Waste to Energy
2 U-1 to 7 (76995=69755 MW) of LAKWA REPLACEMENT POWER PROJECT commissioned in April 2018 but intimated in October 2018
has been added to state sector of Assam
1 Badarpur TPS (705 MW) has been retired from central sector of Northern Region
Capacity Up-rated
Ownership Sector
873080 13830
Capacity Added during
1 U-2 (600 MW) of MAHAN TPP has been commissioned and added to private sector of Madhya Pradesh
Grand TotalThermalNuclear Hydro
Islands
ALL INDIA
Abbreviation- SHP=Small Hydro Project (le 25 MW) BP=Biomass Power UampI=Urban amp Industrial Waste Power RES=Renewable Energy Sources
Northern Region
Western Region
Southern Region
Eastern Region
North Eastern
Region
RES
(MNRE)
Modewise breakup
File NoCEA-CH-14-1142018-Coordination Division
Coal Gas Diesel Total
State 13500 180040 000 193540 000 000 000 193540
Private 86922 10800 000 97722 000 000 12157 109879
Central 311272 20701 000 331973 10283 72309 000 414565
Sub-Total 411694 211541 000 623235 10283 72309 12157 717984
State 272000 15000 000 287000 000 110282 5930 403212
Private 408078 000 000 408078 000 20000 34745 462823
Central 129472 53561 000 183034 10094 66370181 500 259998
Sub-Total 809550 68561 000 878112 10094 196652 41175 1126032
State 000 000 000 000 000 69460 25661 95121
Private 000 000 000 000 000 99200 60536 159736
Central 18340 6201 000 24541 2895 122388 000 149824
Sub-Total 18340 6201 000 24541 2895 291048 86197 404681
State 000 17500 000 17500 000 123000 12903 153403
Private 000 000 000 000 000 000 5985 5985
Central 50639 12907 000 63547 6798 109188 000 179533
Sub-Total 50639 30407 000 81047 6798 232188 18888 338921
State 176000 15000 000 191000 000 259770 12780 463550
Private 511550 000 000 511550 000 28800 115462 655812
Central 85458 26401 000 111859 19681 92342 000 223882
Sub-Total 773008 41401 000 814409 19681 380912 128242 1343244
State 585000 60380 000 645380 000 109618 2385 757383
Private 388200 000 000 388200 000 10400 710680 1109280
Central 120625 22110 000 142735 55674 73901 29400 301710
Sub-Total 1093825 82490 000 1176315 55674 193919 742465 2168373
State 546900 000 000 546900 000 72410 2510 621820
Private 871433 000 000 871433 000 84200 266691 1222324
Central 379639 54949 000 434588 28948 180253 3000 646789
Sub-Total 1797972 54949 000 1852921 28948 336863 272201 2490933
State 000 000 000 000 000 125215 6787 132002
Private 9900 45000 000 54900 000 8800 52244 115944
Central 34324 6966 000 41290 3124 47554 000 91968
Sub-Total 44224 51966 000 96190 3124 181569 59031 339914
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 3035 3035
Central 3815 1503 000 5317 801 10171 000 16289
Sub-Total 3815 1503 000 5317 801 10171 3035 19324
124953 29105 000 154058 23703 75145 000 252907
State 1593400 287920 000 1881320 000 869755 68956 2820031
Private 2276083 55800 000 2331883 000 251400 1261535 3844818
Central 1258537 234406 000 1492943 162000 849622 32900 2537465
Grand Total 5128020 578126 000 5706146 162000 1970777 1363391 9202314
Uttar Pradesh
Uttarakhand
Chandigarh
Grand TotalThermalNuclear
Hydro
(Renewable)
RES
(MNRE)
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
NORTHERN REGION
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
(As on 31102018)
Central - Unallocated
Total (Northern
Region)
Delhi
Haryana
Himachal Pradesh
Jammu amp Kashmir
Punjab
Rajasthan
State Ownership Sector
Modewise breakup
File NoCEA-CH-14-1142018-Coordination Division
(As on 31102018)
Coal Gas Diesel Total
State 000 000 000 000 000 000 005 005
Private 000 4800 000 4800 000 000 091 4891
Central 45478 1967 000 47445 2600 000 000 50045
Sub-Total 45478 6767 000 52245 2600 000 096 54941
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 1301 1301
Central 12663 4334 000 16997 700 000 000 17697
Sub-Total 12663 4334 000 16997 700 000 1301 18998
State 475000 217782 000 692782 000 77200 800 770782
Private 776567 396000 000 1172567 000 000 729782 1902349
Central 309051 42400 000 351451 55900 000 23830 431181
Sub-Total 1560618 656182 000 2216800 55900 77200 754412 3104312
State 408000 000 000 408000 000 170366 8396 586762
Private 617400 10000 000 627400 000 000 378205 1005605
Central 279441 25700 000 305141 27300 152000 30000 514441
Sub-Total 1304841 35700 000 1340541 27300 322366 416601 2106808
State 228000 000 000 228000 000 12000 1105 241105
Private 849000 000 000 849000 000 000 52430 901430
Central 195344 000 000 195344 4800 10000 000 210144
Sub-Total 1272344 000 000 1272344 4800 22000 53535 1352679
State 1017000 67200 000 1084200 000 285084 20813 1390097
Private 1245600 56800 000 1302400 000 48100 842815 2193315
Central 433475 227273 000 660748 69000 000 12300 742048
Sub-Total 2696075 351273 000 3047348 69000 333184 875927 4325459
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 546 546
Central 17444 6634 000 24078 900 000 000 24978
Sub-Total 17444 6634 000 24078 900 000 546 25524
211400 19759 000 231159 22800 000 000 253959
State 2128000 284982 000 2412982 000 544650 31119 2988751
Private 3488567 467600 000 3956167 000 48100 2005170 6009437
Central 1504295 328067 000 1832362 184000 162000 66130 2244492
Grand Total 7120862 1080649 000 8201511 184000 754750 2102418 11242679
Central - Unallocated
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
WESTERN REGION
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
State Ownership Sector
Modewise breakup
Grand TotalThermalNuclear
Hydro
(Renewable)
RES
(MNRE)
Total (Western
Region)
Goa
Daman amp Diu
Gujarat
Madhya Pradesh
Chhattisgarh
Maharashtra
Dadra amp Nagar
Naveli
File NoCEA-CH-14-1142018-Coordination Division
(As on 31102018)
Coal Gas Diesel Total
State 501000 23540 000 524540 000 167360 4875 696775
Private 387388 381318 3680 772386 000 000 693073 1465459
Central 167456 000 000 167456 12727 000 25000 205183
Sub-Total 1055844 404858 3680 1464382 12727 167360 722948 2367417
State 508250 000 000 508250 000 247993 4022 760265
Private 83945 83182 000 167127 000 000 375048 542175
Central 195612 000 000 195612 14873 000 1000 211485
Sub-Total 787807 83182 000 870989 14873 247993 380070 1513925
State 502000 000 12792 514792 000 359980 15533 890305
Private 195850 000 2520 198370 000 000 1275640 1474010
Central 282920 000 000 282920 69800 000 000 352720
Sub-Total 980770 000 15312 996082 69800 359980 1291173 2717035
State 000 000 15996 15996 000 188150 15402 219548
Private 61500 17400 000 78900 000 000 20899 99799
Central 114322 35958 000 150280 36200 000 5000 191480
Sub-Total 175822 53358 15996 245176 36200 188150 41301 510827
State 432000 52408 000 484408 000 220320 12270 716998
Private 483767 50310 41170 575247 000 000 1130984 1706231
Central 448952 000 000 448952 144800 000 18190 611942
Sub-Total 1364719 102718 41170 1508607 144800 220320 1161444 3035171
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 000 000
Central 10000 000 000 10000 000 000 000 10000
Sub-Total 10000 000 000 10000 000 000 000 10000
State 000 3250 000 3250 000 000 000 3250
Private 000 000 000 000 000 000 171 171
Central 24840 000 000 24840 8600 000 000 33440
Sub-Total 24840 3250 000 28090 8600 000 171 36861
178400 000 000 178400 45000 000 000 223400
State 1943250 79198 28788 2051236 000 1183803 52102 3287141
Private 1212450 532210 47370 1792030 000 000 3495815 5287845
Central 1422502 35958 000 1458460 332000 000 49190 1839650
Grand Total 4578202 647366 76158 5301726 332000 1183803 3597107 10414636
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
SOUTHERN REGION
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
State Ownership Sector
Modewise breakup
Grand TotalThermal RES
(MNRE)Nuclear
Hydro
(Renewable)
Kerala
Tamil Nadu
NLC
Puducherry
Central - Unallocated
Total (Southern
Region)
Andhra Pradesh
Telangana
Karnataka
File NoCEA-CH-14-1142018-Coordination Division
(As on 31102018)
Coal Gas Diesel Total
State 71000 000 000 71000 000 000 7070 78070
Private 28100 000 000 28100 000 000 25545 53645
Central 291433 000 000 291433 000 11000 000 302432
Sub-Total 390533 000 000 390533 000 11000 32615 434147
State 42000 000 000 42000 000 13000 405 55405
Private 73000 000 000 73000 000 000 3207 76207
Central 39374 000 000 39374 000 6100 000 45474
Sub-Total 154374 000 000 154374 000 19100 3612 177086
State 540000 10000 000 550000 000 98600 9195 657795
Private 242500 000 000 242500 000 000 34452 276952
Central 76077 000 000 76077 000 41000 000 117077
Sub-Total 858577 10000 000 868577 000 139600 43647 1051824
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 000 000
Central 698504 000 000 698504 000 18620 000 717124
Sub-Total 698504 000 000 698504 000 18620 000 717124
State 42000 000 000 42000 000 206192 630 248822
Private 293900 000 000 293900 000 000 21648 315548
Central 163390 000 000 163390 000 8900 1000 173290
Sub-Total 499290 000 000 499290 000 215092 23278 737660
State 000 000 000 000 000 36000 5211 41211
Private 000 000 000 000 000 39900 001 39901
Central 8703 000 000 8703 000 6400 000 15103
Sub-Total 8703 000 000 8703 000 82300 5212 96215
110183 000 000 110183 000 8501 000 118684
State 695000 10000 000 705000 000 353792 22511 1081303
Private 637500 000 000 637500 000 39900 84853 762253
Central 1387664 000 000 1387664 000 100520 1000 1489184
Grand Total 2720164 10000 000 2730164 000 494212 108364 3332740
(As on 31102018)
Coal Gas Diesel Total
State 000 32821 000 32821 000 10000 3001 45822
Private 000 2450 000 2450 000 000 1680 4130
Central 27902 43556 000 71458 000 36851 000 108309
Sub-Total 27902 78827 000 106729 000 46851 4681 158261
State 000 000 000 000 000 000 10710 10710
Private 000 000 000 000 000 000 539 539
Central 2470 4682 000 7152 000 11800 000 18952
Sub-Total 2470 4682 000 7152 000 11800 11249 30201
State 000 000 000 000 000 32200 3103 35303
Private 000 000 000 000 000 000 006 006
Central 3040 10969 000 14009 000 7446 000 21455
Sub-Total 3040 10969 000 14009 000 39646 3109 56764
State 000 16950 000 16950 000 000 1601 18551
Private 000 000 000 000 000 000 009 009
Central 3740 43695 000 47435 000 7077 500 55012
Sub-Total 3740 60645 000 64385 000 7077 2110 73572
State 000 000 3600 3600 000 000 545 4145
Private 000 000 000 000 000 000 217 217
Central 3140 7157 000 10297 000 9677 000 19974
Sub-Total 3140 7157 3600 13897 000 9677 762 24336
State 000 000 000 000 000 000 3067 3067
Private 000 000 000 000 000 000 100 100
Central 2140 4893 000 7033 000 5860 000 12893
Sub-Total 2140 4893 000 7033 000 5860 3167 16060
State 000 000 000 000 000 000 3647 3647
Private 000 000 000 000 000 000 020 020
Central 2070 4046 000 6116 000 9913 000 16029
Sub-Total 2070 4046 000 6116 000 9913 3667 19696
7500 6362 000 13862 000 14376 000 28238
State 000 49771 3600 53371 000 42200 25674 121245
Private 000 2450 000 2450 000 000 2571 5021
Central 52002 125360 000 177362 000 103000 500 280862
Grand Total 52002 177581 3600 233183 000 145200 28745 407128
Central - Unallocated
Total (Eastern
Region)
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
NORTH-EASTERN REGION
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
State Ownership Sector
Modewise breakup
Grand TotalThermalNuclear
Bihar
Jharkhand
West Bengal
DVC
Odisha
Sikkim
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
EASTERN REGION
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
Ownership Sector
Modewise breakup
Grand TotalThermalNuclear
Hydro
(Renewable)
RES
(MNRE)
Manipur
Nagaland
State
Mizoram
Central - Unallocated
Total (North-
Eastern Region)
Hydro
(Renewable)
RES
(MNRE)
Assam
Arunachal Pradesh
Meghalaya
Tripura
File NoCEA-CH-14-1142018-Coordination Division
(As on 31102018)
Coal Gas Diesel Total
State 000 000 4005 4005 000 000 525 4530
Private 000 000 000 000 000 000 146 146
Central 000 000 000 000 000 000 510 510
Sub-Total 000 000 4005 4005 000 000 1181 5186
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 075 075
Central 000 000 000 000 000 000 000 000
Sub-Total 000 000 000 000 000 000 075 075
State 000 000 4005 4005 000 000 525 4530
Private 000 000 000 000 000 000 221 221
Central 000 000 000 000 000 000 510 510
Grand Total 000 000 4005 4005 000 000 1256 5261
19
Andaman amp
Nicobar
lakshadweep
Total (Islands)
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
State Ownership Sector
Modewise breakup
Grand TotalThermalNuclear
Hydro
(Renewable)
RES
(MNRE)
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
ISLANDS
File NoCEA-CH-14-1142018-Coordination Division
SrNo Contents Page
1 Executive summary of Target and Achievement of Transmission Lines during 2018-19
20(1)
2 List of Transmission Lines CommissionedReady for commissioning during Oct-2018 20(2)
Section C - Transmission Lines
File NoCEA-CH-14-1142018-Coordination Division
Executive summary of Target and Achievement of Transmission Lines during 2018-19 As on Oct-18
(All figures in circuit kms)
Centr
al S
ecto
r
Sta
te S
ecto
r
JV
Private
Secto
r
To
tal
Centr
al S
ecto
r
Sta
te S
ecto
r
JV
Private
Secto
r
To
tal
Centr
al S
ecto
r
Sta
te S
ecto
r
JV
Private
Secto
r
To
tal
Centr
al S
ecto
r
Sta
te S
ecto
r
JV
Private
Secto
r
To
tal
Centr
al S
ecto
r
Sta
te S
ecto
r
JV
Private
Secto
r
To
tal
Cen
tral S
ecto
r
Sta
te S
ecto
r
JV
Pri
vate
Secto
r
Gra
nd
To
tal
0 0 0 0 0 0 0 0 4692 766 827 6285 3045 5906 980 9931 553 5878 0 6431 8290 12550 1807 22647
Oct18 Programme 0 0 0 0 0 0 0 0 300 0 0 300 662 90 562 1314 0 723 0 723 962 813 562 2337
Achievement 0 0 0 0 0 0 0 0 729 0 0 729 471 266 0 737 0 401 0 401 1200 667 0 1867
Upto Oct-18 Programme 0 0 0 0 0 0 0 0 3004 416 0 3420 1350 3109 562 5021 481 4346 0 4827 4835 7871 562 13268
Achievement 0 0 0 0 0 0 0 0 2286 0 178 2464 1436 1783 1595 4814 60 4461 0 4521 3782 6244 1773 11799
20(1)
220 kV Grand Total 800 kV 500 kV
Programme 2018-19
Programme
Achievement
HVDC765 kV 400 kV
File NoCEA-CH-14-1142018-Coordination Division
SlNo Line
Length
(cKM)
1 2 3 4 5 6
1 765 Jharsuguda - Dharamjaygarh line DC PGCIL 296
2 765LILO of Kurnool - Thirvualam line at
CuddapahDC PGCIL 190
3 765 Salem PS - Madhugiri PS line SC PGCIL 243
4 400 Cuddapah - Hindupur line (Q) DC PGCIL 338
5 400LILO of Both Ckt of Bamnauli - Samaypur at
TughlakabadMC PGCIL 114
6 400LILO-Out of Cuddapah - Hindupur line (Q)
(Both Ckts) at NP Kunta ssDC PGCIL 19
1200
7 400LILO of Sterlite - Meramundali at Lapanga
4oo kV ssDC OPTCL 14
8 400 Sterlite - Lapanga line DC OPTCL 37
9 400 TMDC Podili - Sattapenalli line DC APTRANSCO 215
10 230Neyveli 230110 kV ss - Eachangadu
230kV FeederSC TANTRANSCO 1
11 230 NNTPS - Neyveli 230110kV ss DC TANTRANSCO 2
12 220 Ajmer (400 kV) - Bherunda (TK) DC RVPNL 100
13 220 Aligarh - Atrauli line DC UPPTCL 77
14 220 Khandwa - Chhanera line DC MPPTCL 78
15 220LILO of one Ckt of Hadala - Sartanpar line
at Wankaner on MC towersDC GETCO 6
16 220 LILO of one Ckt of Vita - Miraj at Alkud ss DC MSETCL 27
17 220 Mendhigiri - Alkud ss DC MSETCL 110
667
1867
20(2)
Grand Total
2Transmission Lines (220 kV and above) CommissionedReady for commissioning During Oct-2018
As on 31-10-18
Voltage
Level (kV)Name of Transmission Lines
Circuit
Type
Executing
Agency
CENTRAL SECTOR
Total of CENTRAL SECTOR
STATE SECTOR Sector
Total of STATE SECTOR
File NoCEA-CH-14-1142018-Coordination Division
SN Contents Page
1 Executive summary of Target and Achievement of Substations during 2018-19 21(1)
2Sub Stations (220 kV and above) commissionedready for commisssioning during Oct-
201821(2)
Section D - Sub Stations
File NoCEA-CH-14-1142018-Coordination Division
1 Executive summary of Target and Achievement of Substations during 2018-19 As on Oct-18
(All figures in circuit MVA)
Centr
al S
ecto
r
Sta
te S
ecto
r
JV
Private
Secto
r
To
tal
Centr
al S
ecto
r
Sta
te S
ecto
r
JV
Private
Secto
r
To
tal
Centr
al S
ecto
r
Sta
te S
ecto
r
JV
Private
Secto
r
To
tal
Centr
al S
ecto
r
Sta
te S
ecto
r
JV
Private
Secto
r
To
tal
Centr
al S
ecto
r
Sta
te S
ecto
r
JV
Private
Secto
r
To
tal
Cen
tral S
ecto
r
Sta
te S
ecto
r
JV
Pri
vate
Secto
r
Gra
nd
To
tal
3000 0 0 3000 0 0 0 0 22200 0 0 22200 8185 13085 630 21900 740 14760 0 15500 34125 27845 630 62600
Oct18 Programme 0 0 0 0 0 0 0 0 0 0 0 0 1000 1260 630 2890 0 1400 0 1400 1000 2660 630 4290
Achievement 0 0 0 0 0 0 0 0 3000 0 0 3000 1500 3120 0 4620 0 2220 0 2220 4500 5340 0 9840
Upto Oct-18 Programme 0 0 0 0 0 0 0 0 10000 0 0 10000 6130 7435 630 14195 0 9670 0 9670 16130 17105 630 33865
Achievement 0 0 0 0 0 0 0 0 14000 0 0 14000 9000 7550 630 17180 0 10610 0 10610 23000 18160 630 41790
21(1)
220 kV Grand Total 800 kV 500 kV
Programme 2018-19
Programme
Achievement
HVDC765 kV 400 kV
File NoCEA-CH-14-1142018-Coordination Division
As on 31-10-18
Sl Voltage Ratio Capacity
No (kVkV) (MWMVA)
1 2 3 4 5
1 Cuddapah Ss 765400 PGCIL 3000
2 Tughlakabad SS (GIS) 400220 PGCIL 1500
Total of CENTRAL SECTOR 4500
3 Panki Kanpur (Aug) TF-I 400200 UPPTCL 75
4 Hindupur ss (1st ICT) 400220 APTRANSCO 315
5 Thappagundu ss 400110 TANTRANSCO 600
6 Mendhasal (2nd power TF) 400220 OPTCL 20
7 Jodhpur ss (New) 400220 RVPNL 315
8 Shankarpally 400220 TSTRANSCO 500
9 Podili ss (1st ICT) 400220 APTRANSCO 315
10 Doni (Gadag)SS 400220 KPTCL 1000
11 Porur (Addl TF) 230110 TANTRANSCO 100
12 Anuppankulam (Addl TF) 230110 TANTRANSCO 60
13 Neyveli SS 230110 TANTRANSCO 480
14 Savarkundla (Aug) 22066 GETCO 60
15 Bhuna (Aug) 220132 HVPNL 100
16 Madanpur (Aug) 22066 HVPNL 100
17 Gurgaon Sec-52A (Aug) 22066 HVPNL 160
18 IA Hisar (Aug) 220132 HVPNL 50
19 Narwana (Aug) 220132 HVPNL 60
20 Therubali (3rd Auto TF) 220132 OPTCL 160
21 Halasar ss 220132 RVPNL 160
22 Bansi Siddaharthnagar (Aug) TF-I 220132 UPPTCL 60
23 Hata Kushinagar (New) TF-I 220132 UPPTCL 100
24 Gomti nagar Lucknow (Aug) TF-IV 22033 UPPTCL 60
25 Kanpur Road Lucknow (New) TF-III 22033 UPPTCL 60
26 Asoj (Aug) 22066 GETCO 150
27 Kangasiyali (Aug) 22066 GETCO 60
28 Karmsad (Aug) 22066 GETCO 160
29 Lalpar (Aug) 22066 GETCO 60
TOTAL STATE SECTOR 5340
GRAND TOTAL 9840
21(2)
PRIVATE SECTOR
CENTRAL SECTOR
STATE SECTOR
2Sub-Stations (220 kV and above) CommissionedReady for commissioning During Oct-2018
Name of Sub StationsExecuting
Agency
File NoCEA-CH-14-1142018-Coordination Division
SN Contents Page
1 Electricity Generation (MU) Targets and Achievements for 2018-19 22
Section E - Electricity Generation
File NoCEA-CH-14-1142018-Coordination Division
Programme Achievement Ach Programme Achievement Ach
Central Sector 35160700 3028100 3162321 10443 20144400 21150469 10499
State Sector 35132000 3010000 3017260 10024 19922100 19549030 9813
PvtIPP Sector 36999700 3240600 3375603 10417 21598300 20794155 9628
PvtUTL Sector 1857600 164500 180597 10979 1130900 1203107 10638
Total 109150000 9443200 9735781 10310 62795700 62696761 9984
Central Sector 5617600 420900 451004 10715 4193000 4045436 9648
State Sector 6110600 559500 708469 12663 4049400 4433000 10947
PvtIPP Sector 1141800 80500 90122 11195 976400 1021963 10467
PvtUTL Sector 130000 11300 12564 11119 76700 99943 13030
Total 13000000 1072200 1262159 11772 9295500 9600342 10328
Central Sector 3850000 353300 303310 8585 2068900 2203540 10651
Total 3850000 353300 303310 8585 2068900 2203540 10651
Bhutan Import 500000 63300 35395 5592 347000 416660 12007
Central Sector 44628300 3802300 3916635 10301 26406300 27399445 10376
State Sector 41242600 3569500 3725729 10438 23971500 23982030 10004
Pvt Sector 40129100 3496900 3658886 10463 23782300 23119168 9721
Total 126500000 10932000 11336645 10370 74507100 74917303 10055
Provisional based on actual-cum-Assesment
Figs in MU
Cummulative
Achievement
Cummulative
Achievement
Sep-18 Sep-17 Upto Sep-2018 Upto Sep-2017
1073794 748889 7332680 5660929
22
Renewable Energy Generation
Achievement
Oct-2018
1 Electricity Generation (MU) Targets and Achievememts for 2018-19
All India Energy Generation During April 2018- Oct 2018 (MU)
Target (2018-19)April 2018- Oct 2018
Sector
Hydro
Thermal
Nuclear
627957
92955
20689
745071
626968
96003
22035
749173
0
100000
200000
300000
400000
500000
600000
700000
800000
Thermal Hydro Nuclear Total
Programme
Achievement
File NoCEA-CH-14-1142018-Coordination Division
SN Contents Page
1 Energy Power Supply Position (Provisional) for Oct-2018 and during April 2018- Oct 2018 23
2 Peak Power Supply Position (Provisional) for Oct-2018 and during April 2018- Oct 2018 24
3 Energy Power Supply Position (Revised) for Sep-2018 and during April 2018- Sept 2018 25
4 Peak Power Supply Position (Revised) for Sep-2018 and during April 2018- Sept 2018 26
5 Notified Power cuts Restrictions on Industries during Oct-2018 27
6 Power Supply to Agricultural Sector during Oct-2018 28
Section F - Power supply position
File NoCEA-CH-14-1142018-Coordination Division
आकड़ मममलयन यननट नट Figures in MU net
ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied
कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )
चडीगढ़ Chandigarh 108 108 0 00 1055 1055 0 00
दिलली Delhi 2490 2489 1 00 22524 22510 14 01
हरियजणज Haryana 4554 4554 0 00 35205 35205 0 00
दहमजचल परिश Himachal Pradesh 788 787 2 02 5728 5560 168 29
रमम कशमीि Jammu amp Kashmir 1497 1219 278 186 10982 8865 2117 193
परजब Punjab 4418 4418 0 00 38832 38819 13 00
िजरसथजन Rajasthan 6748 6748 0 00 45341 45181 160 04
उतति परिश Uttar Pradesh 10136 9973 164 16 75485 74808 676 09
उततिजखड Uttarakhand 1083 1081 3 03 8395 8310 85 10
उततरी कषतर Northern Region 31822 31375 447 14 243547 240314 3233 13
छततीसगढ़ Chhattisgarh 2454 2453 1 00 16119 16091 28 02
गरिजत Gujarat 11636 11636 0 00 70782 70768 14 00
मधय परिश Madhya Pradesh 5860 5859 1 00 38412 38410 2 00
महजिजषटर Maharashtra 15223 15095 128 08 95489 95355 134 01
िमन औि दिउ Daman amp Diu 216 216 0 00 1523 1523 0 00
िजिि व नगि हवली Dadra amp Nagar Haveli 553 553 0 00 3757 3757 0 00
गोवज Goa 366 366 0 00 2497 2495 2 01
पशचिमी कषतर Western Region 36308 36178 130 04 228579 228398 180 01
आनधर परिश Andhra Pradesh 5860 5854 6 01 37377 37334 43 01
तलगजनज Telangana 6748 6742 6 01 38251 38205 46 01
कनजाटक Karnataka 5842 5835 7 01 39111 39059 52 01
किल Kerala 2116 2096 20 09 14256 14160 96 07
तममल नजड Tamil Nadu 8611 8601 10 01 65742 65666 76 01
पडचिी Puducherry 216 215 1 05 1654 1646 8 05
लकष-दवीप Lakshadweep 4 4 0 0 27 27 0 0
दकषकषणी कषतर Southern Region 29392 29342 50 02 196390 196069 321 02
बबहजि Bihar 2742 2738 4 01 19143 18951 192 10
िजमोिि घजटी ननगम DVC 1712 1698 13 08 13096 12828 268 20
झजिखणड Jharkhand 701 697 4 06 5022 4949 73 15
ओडडशज Odisha 3147 3134 13 04 20224 20192 32 02
पशशचम बगजल West Bengal 4204 4200 4 01 33008 32881 127 04
मसशककम Sikkim 40 40 0 00 279 279 0 01
अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 67 202 188 13 67
परवी कषतर Eastern Region 12547 12507 40 03 90772 90080 692 08
अरणजचल परिश Arunachal Pradesh 67 66 1 09 502 496 7 13
असम Assam 833 809 24 29 6153 5903 250 41
मणणपि Manipur 72 71 1 10 485 478 7 14
मघजलय Meghalaya 147 147 0 00 1043 1042 0 00
ममज़ोिम Mizoram 63 62 1 08 365 359 5 14
नजगजलड Nagaland 76 67 8 110 540 481 59 109
बिपिज Tripura 130 129 1 09 1025 1007 19 18
उततर-परवी कषतर North-Eastern Region 1387 1351 35 25 10113 9766 346 34
समपणण भारत All India 111455 110753 702 06 769399 764627 4773 06
23
ऊराण वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Energy Power Supply Position Report (Provisional)
राजयStateअकरबर2018 October2018 अपरल2018 -अकरबर2018 April2018 to October2018
ऊरजा पनत ा म कमी ऊरजा पनत ा म कमीEnergy not Supplied
Excludes energy exported to Bangladesh
Energy not Supplied
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
File NoCEA-CH-14-1142018-Coordination Division
अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met
कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )
चडीगढ़ Chandigarh 217 217 0 00 369 369 0 00
दिलली Delhi 4713 4713 0 00 7016 7016 0 00
हरियजणज Haryana 7948 7948 0 00 10270 10270 0 00
दहमजचल परिश Himachal Pradesh 1520 1520 0 00 1520 1520 0 00
रमम कशमीि Jammu amp Kashmir 2836 2269 567 200 2951 2361 590 200
परजब Punjab 7979 7979 0 00 12638 12638 0 00
िजरसथजन Rajasthan 11450 11450 0 00 11698 11698 0 00
उतति परिश Uttar Pradesh 17434 16745 688 39 20498 20062 436 21
उततिजखड Uttarakhand 1943 1943 0 00 2143 2143 0 00
उततरी कषतर Northern Region 50659 49635 1024 20 63166 61726 1440 23
छततीसगढ़ Chhattisgarh 4414 4268 146 33 4414 4268 146 33
गरिजत Gujarat 18148 18130 19 01 18148 18130 19 01
मधय परिश Madhya Pradesh 11356 11317 39 03 11356 11317 39 03
महजिजषटर Maharashtra 23864 23159 705 30 23864 23254 610 26
िमन औि दिउ Daman amp Diu 342 341 1 02 357 356 1 02
िजिि व नगि हवली Dadra amp Nagar Haveli 784 780 4 05 816 815 1 01
गोवज Goa 536 536 0 00 596 596 0 00
पशचिमी कषतर Western Region 56548 55695 853 15 56548 55695 853 15
आनधर परिश Andhra Pradesh 9435 9435 0 00 9435 9435 0 00
तलगजनज Telangana 10603 10603 0 00 10815 10815 0 00
कनजाटक Karnataka 10741 10741 0 00 10741 10741 0 00
किल Kerala 3727 3644 83 22 4050 3997 53 13
तममल नजड Tamil Nadu 14747 14333 414 28 15029 14981 47 03
पडचिी Puducherry 363 362 1 03 420 400 19 46
लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0
दकषकषणी कषतर Southern Region 45279 45226 53 01 45946 45684 262 06
बबहजि Bihar 4945 4945 0 00 5050 5045 5 01
िजमोिि घजटी ननगम DVC 2729 2729 0 00 2874 2874 0 00
झजिखणड Jharkhand 1260 1260 0 00 1339 1284 55 41
ओडडशज Odisha 5624 5224 400 71 5624 5357 268 48
पशशचम बगजल West Bengal 8775 8775 0 00 9130 9123 7 01
मसशककम Sikkim 86 86 0 00 90 90 0 00
अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7
परवी कषतर Eastern Region 22959 22567 392 17 22959 22567 392 17
अरणजचल परिश Arunachal Pradesh 138 125 13 94 138 133 5 37
असम Assam 1785 1704 81 45 1865 1809 56 30
मणणपि Manipur 187 185 2 11 193 186 7 36
मघजलय Meghalaya 336 336 0 00 371 368 2 07
ममज़ोिम Mizoram 99 97 2 20 103 98 4 41
नजगजलड Nagaland 134 131 3 22 156 138 18 117
बिपिज Tripura 269 269 0 00 298 293 5 17
उततर-परवी कषतर North-Eastern Region 2790 2700 90 32 2967 2850 117 39
समपणण भारत All India 172945 170604 2341 14 177022 175528 1494 08
24
अधिकतम वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Peak Power Supply Position Report (Provisional)
आकड़ मगज वजट नट Figures in MW netअपरल2018 -अकरबर2018 April2018 to October2018
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
मजग की पनता म कमी Demand not Met
Excludes the supply to Bangladesh
राजयStateअकरबर2018 October2018
मजग की पनता म कमी Demand not Met
File NoCEA-CH-14-1142018-Coordination Division
आकड़ मममलयन यननट नट Figures in MU net
ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied
कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )
चडीगढ़ Chandigarh 141 141 0 00 947 947 0 00
दिलली Delhi 2925 2924 1 00 20034 20021 13 01
हरियजणज Haryana 4794 4794 0 00 30651 30651 0 00
दहमजचल परिश Himachal Pradesh 876 853 24 27 4940 4773 167 34
रमम कशमीि Jammu amp Kashmir 1520 1246 274 180 9485 7646 1839 194
परजब Punjab 5575 5575 0 00 34414 34401 13 00
िजरसथजन Rajasthan 6202 6201 0 00 38594 38434 160 04
उतति परिश Uttar Pradesh 10211 10124 86 08 65349 64836 513 08
उततिजखड Uttarakhand 1162 1149 13 11 7311 7229 82 11
उततरी कषतर Northern Region 33405 33008 398 12 211725 208939 2786 13
छततीसगढ़ Chhattisgarh 2403 2388 15 06 13665 13638 27 02
गरिजत Gujarat 10122 10122 0 00 59146 59132 14 00
मधय परिश Madhya Pradesh 5492 5491 1 00 32552 32551 1 00
महजिजषटर Maharashtra 13615 13612 3 00 80266 80260 6 00
िमन औि दिउ Daman amp Diu 221 221 0 00 1306 1306 0 00
िजिि व नगि हवली Dadra amp Nagar Haveli 551 551 0 00 3204 3204 0 00
गोवज Goa 339 339 0 00 2131 2128 2 01
पशचिमी कषतर Western Region 32742 32723 19 01 192270 192220 50 00
आनधर परिश Andhra Pradesh 5294 5287 7 01 31518 31480 37 01
तलगजनज Telangana 6279 6272 8 01 31503 31463 40 01
कनजाटक Karnataka 5701 5693 8 01 33269 33225 45 01
किल Kerala 2050 2026 24 12 12140 12063 76 06
तममल नजड Tamil Nadu 8971 8959 12 01 57131 57065 66 01
पडचिी Puducherry 226 224 2 08 1438 1431 7 05
लकष-दवीप Lakshadweep 4 4 0 0 23 23 0 0
दकषकषणी कषतर Southern Region 28520 28460 60 02 166998 166727 271 02
बबहजि Bihar 2839 2793 46 16 16400 16213 188 11
िजमोिि घजटी ननगम DVC 1901 1750 151 79 11384 11130 254 22
झजिखणड Jharkhand 740 723 17 22 4321 4252 69 16
ओडडशज Odisha 2921 2918 3 01 17077 17058 19 01
पशशचम बगजल West Bengal 4902 4879 23 05 28804 28681 123 04
मसशककम Sikkim 39 39 0 01 239 239 0 01
अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 67 173 162 12 67
परवी कषतर Eastern Region 13341 13102 240 18 78225 77573 652 08
अरणजचल परिश Arunachal Pradesh 74 73 1 10 435 429 6 14
असम Assam 950 914 36 38 5320 5094 226 43
मणणपि Manipur 70 69 1 11 414 408 6 15
मघजलय Meghalaya 150 150 0 01 896 896 0 01
ममज़ोिम Mizoram 58 57 1 12 302 297 5 16
नजगजलड Nagaland 80 72 8 104 464 414 50 108
बिपिज Tripura 192 191 1 07 895 878 17 19
उततर-परवी कषतर North-Eastern Region 1575 1527 48 31 8726 8415 311 36
समपणण भारत All India 109584 108819 765 07 657944 653873 4071 06
Energy not Supplied Energy not Supplied
ससतबर2018 September2018 अपरल2018 -ससतबर2018 April2018 to September2018
ऊरजा पनत ा म कमी ऊरजा पनत ा म कमी
Excludes energy exported to Bangladesh
राजयState
ऊराण वरवदयत आपरतण शथिरत ररपोरण (सशोधित) Energy Power Supply Position Report (Revised)
25
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
File NoCEA-CH-14-1142018-Coordination Division
अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met
कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )
चडीगढ़ Chandigarh 293 293 0 00 369 369 0 00
दिलली Delhi 5358 5358 0 00 7016 7016 0 00
हरियजणज Haryana 9008 9008 0 00 10270 10270 0 00
दहमजचल परिश Himachal Pradesh 1466 1466 0 00 1479 1479 0 00
रमम कशमीि Jammu amp Kashmir 2951 2361 590 200 2951 2361 590 200
परजब Punjab 11405 11405 0 00 12638 12638 0 00
िजरसथजन Rajasthan 10612 10612 0 00 11698 11698 0 00
उतति परिश Uttar Pradesh 18346 18121 225 12 20498 20062 436 21
उततिजखड Uttarakhand 1996 1996 0 00 2143 2143 0 00
उततरी कषतर Northern Region 56407 55649 758 13 63166 61726 1440 23
छततीसगढ़ Chhattisgarh 4404 4075 328 75 4404 4136 268 61
गरिजत Gujarat 16963 16963 0 00 17053 16963 90 05
मधय परिश Madhya Pradesh 8811 8771 41 05 8811 8775 36 04
महजिजषटर Maharashtra 22455 22349 106 05 23395 23254 141 06
िमन औि दिउ Daman amp Diu 357 356 1 02 357 356 1 02
िजिि व नगि हवली Dadra amp Nagar Haveli 816 815 1 01 816 815 1 01
गोवज Goa 596 596 0 00 596 596 0 00
पशचिमी कषतर Western Region 52933 52895 38 01 53841 52895 945 18
आनधर परिश Andhra Pradesh 9435 9416 19 02 9435 9416 19 02
तलगजनज Telangana 10815 10815 0 00 10815 10815 0 00
कनजाटक Karnataka 10103 10090 13 01 10690 10688 2 00
किल Kerala 3888 3638 251 64 4050 3997 53 13
तममल नजड Tamil Nadu 14556 14553 3 00 15029 14981 47 03
पडचिी Puducherry 390 372 17 45 420 400 19 46
लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0
दकषकषणी कषतर Southern Region 45542 45428 114 02 45946 45684 262 06
बबहजि Bihar 5050 5045 5 01 5050 5045 5 01
िजमोिि घजटी ननगम DVC 2641 2641 0 00 2874 2874 0 00
झजिखणड Jharkhand 1233 1233 0 00 1339 1284 55 41
ओडडशज Odisha 4906 4906 0 00 5357 5357 0 00
पशशचम बगजल West Bengal 8644 8639 5 01 9130 9123 7 01
मसशककम Sikkim 78 78 0 00 90 90 0 00
अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7
परवी कषतर Eastern Region 22110 22100 10 00 22470 22290 180 08
अरणजचल परिश Arunachal Pradesh 132 130 2 15 138 133 5 37
असम Assam 1865 1809 56 30 1865 1809 56 30
मणणपि Manipur 184 182 2 13 193 186 7 36
मघजलय Meghalaya 317 317 0 00 371 368 2 07
ममज़ोिम Mizoram 95 93 2 23 103 98 4 41
नजगजलड Nagaland 142 138 5 32 156 138 18 117
बिपिज Tripura 296 293 3 10 298 293 5 17
उततर-परवी कषतर North-Eastern Region 2921 2850 71 24 2967 2850 117 39
समपणण भारत All India 177022 175528 1494 08 177022 175528 1494 08
26
मजग की पनता म कमी मजग की पनता म कमी Demand not MetDemand not Met
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
Excludes the supply to Bangladesh
अधिकतम वरवदयत आपरतण शथिरत ररपोरण (सशोधित) Peak Power Supply Position Report (Revised)
आकड़ मगज वजट नट Figures in MW net
राजयStateससतबर2018 September2018 अपरल2018 -ससतबर2018 April2018 to September2018
File NoCEA-CH-14-1142018-Coordination Division
अकरबर2018 October2018अपरल2018 -अकरबर2018 April2018 to October2018
उततरी कषतर Northern Region
चडीगढ़ Chandigarh Data not received Data not received
दिलली Delhi
हरियजणज Haryana
दहमजचल परिश Himachal Pradesh
रमम कशमीि Jammu amp Kashmir Data not received Data not received
परजब Punjab
िजरसथजन Rajasthanउतति परिश Uttar Pradesh
उततिजखड Uttarakhand
पशचिमी कषतर Western Region
छततीसगढ़ Chhattisgarh
गरिजत Gujarat
मधय परिश Madhya Pradesh
महजिजषटर Maharashtra
गोवज Goa
दकषकषणी कषतर Southern Region
आनधर परिश Andhra Pradesh
तलगजनज Telangana
कनजाटक Karnataka
किल Kerala
तममल नजड Tamil Nadu
पडचिी Puducherryपरवी कषतर Eastern Region
बबहजि Bihar
झजिखणड Jharkhand
ओडडशज Odisha
पशशचम बगजल West Bengal
N
o No
tified
Cuts
N
o No
tified
Cuts
27
अकरबर 2018 म इडथरीर पर वरवदयत करौती का वरवरवरण Notified Power CutsRestrictions on Industries during October2018
राजय कषतर State Regionऊराणमाग करौती EnergyDemand Cut
No Notified Cuts No Notified Cuts
File NoCEA-CH-14-1142018-Coordination Division
अकरबर2018 October2018अपरल2018 -अकरबर2018 April2018 to October2018
उततरी कषतर Northern Region
चडीगढ़ Chandigarh Data not received Data not received
दिलली Delhi Data not received Data not received
हरियजणज Haryana 940 hrsday 0709 - 0950 hrsday
दहमजचल परिश Himachal Pradesh No cut imposed on agriculture consumers and uninterrupted
power is being supplied to agriculture sector
HPSEBL has only 2 agriculture consumers and uninterrupted
power is being supplied to agriculture sector
रमम कशमीि Jammu amp Kashmir Data not received Data not received
परजब Punjab 0507 hrsday 0349 - 0844 hrsday
िजरसथजन Rajasthan 0630 hrsday 0630 hrsday
उतति परिश Uttar Pradesh 1825 hrsday 1814 - 1858 hrsday
उततिजखड Uttarakhand 2350 hrsday 2128 - 2357 hrsday
पशचिमी कषतर Western Region
छततीसगढ़ Chhattisgarh 18hoursday 18 hrsday
गरिजत Gujarat 805 hrsday 805 hrsday
मधय परिश Madhya Pradesh Three-Phase Supply(Irrigation)-947 hrs day
Three-Phase (Mixed) Supply - 2311 hrs day
Three-Phase Supply(Irrigation)- 0933 - 0947 hrs day Three-
Phase (Mixed) Supply - 2300 - 2320 hrs day
महजिजषटर Maharashtra Three-Phase Supply(Irrigation)- 9 hrs day
Three-Phase (Mixed) Supply - 24 hrs day
Three-Phase Supply(Irrigation)- 9 hrs day
Three-Phase (Mixed) Supply - 24 hrs day
गोवज Goa No restriction No restriction
दकषकषणी कषतर Southern Region
आनधर परिश Andhra Pradesh 07 hrsday 07 hrsday
तलगजनज Telangana 24 hoursday 24 hoursday
कनजाटक Karnataka 6 hrsday 6 hrsday
किल Kerala No Restrictions No Restrictions
तममल नजड Tamil Nadu 9 hrsday (6 hrs during day time and 3 hrs during night time) 9 hrsday (6 hrs during day time and 3 hrs during night time)
पडचिी Puducherry No Restrictions No Restrictions
परवी कषतर Eastern Region
बबहजि Bihar About 18 hrsday About 18 hrsday
झजिखणड Jharkhand About 20 hrsday About 20 hrsday
ओडडशज Odisha 24 hrsday 24 hrsday
पशशचम बगजल West Bengal About 23 hrsday About 23 hrsday
28
अकटबर 2018 कषि कषतर को षिदयत आपरति का षििरण Power Supply to Agricultural Sector during October2018
राजय कषतर State Regionऔसत वरवदयत आपरतण घनरो म Average Hours of Supply
On segregated feeders
File NoCEA-CH-14-1142018-Coordination Division
SNo Contents Page
1 Growth of Installed Capacity since 6th Plan 29
2 Progress of Transmission Sector since 6th Plan 30
3 All India Yearly Coal consumption for Power Generation (Utilities)
4 All India Annual Per Capita Consumption of Electricity since -2006
5 Average cost of power supply amp Average realisation (Paisakwh)
6 Growth of Rural Electrification amp Pump Sets Energisation
7 Status of Hydro Schemes Cleared by the CEA in Oct-2018
Section G - Growth of Power Sector
31
32
File NoCEA-CH-14-1142018-Coordination Division
(In MW)
Coal Gas Diesel Total
End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472
End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634
End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537
End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596
End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921
End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703
End of 12th Plan 19216288 2532938 83763 21832988 6780 4447842 50018 31960630
Up to Oct-2018 19599250 2493722 837629 22176734 6780 4548742 7201281 34604757
Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-17) = 51529 MW
Electricity Generation (MU) Targets and Achievements for 2016-17
Coal Gas Diesel Nuclear Hydro Res Total
1959925 2493722 837629 678000 454874 72012805 22925174
29
1 Growth of Installed Capacity Since 6th Plan
Plan YearThermal
Nuclear Hydro RES (MNRE) Total
Total Installed Capacity 34604757 MW
Coal Gas Diesel Nuclear Hydro Res
File NoCEA-CH-14-1142018-Coordination Division
Progress of Transmission Sector in the Country up to Oct 2018
1 TRANSMISSION LINES (All fig in CKM)
At the end of
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
6th plan 0 0 0 0 0 0 0 0 0 0 0 0 1831 4198 0 6029 1641 44364 0 46005 3472 48562 0 52034
7th plan 0 0 0 0 0 0 0 0 0 0 0 0 13068 6756 0 19824 4560 55071 0 59631 17628 61827 0 79455
8th plan 0 0 0 0 1634 0 0 1634 0 0 0 0 23001 13141 0 36142 6564 73036 0 79600 31199 86177 0 117376
9th plan 0 0 0 0 3234 1504 0 4738 751 409 0 1160 29345 20033 0 49378 8687 88306 0 96993 42017 110252 0 152269
10th plan 0 0 0 0 4368 1504 0 5872 1775 409 0 2184 48708 24730 0 73438 9444 105185 0 114629 64295 131828 0 196123
11th Plan 0 0 0 0 5948 1504 1980 9432 4839 411 0 5250 71023 30191 5605 106819 10140 125010 830 135980 91950 157116 8415 257481
12th Plan 6124 0 0 6124 5948 1504 1980 9432 25465 1177 4598 31240 92482 48240 17065 157787 11014 151276 978 163268 141033 202197 24621 367851
13th Plan (Up
to Mar2018)6124 0 0 6124 5948 1504 1980 9432 28666 1512 4881 35059 98247 54286 19067 171600 11258 156497 1000 168755 150243 213799 26928 390970
13th Plan (Up
to Sep-18)6124 0 0 6124 5948 1504 1980 9432 30952 1512 5059 37523 99683 56069 20662 176414 11318 160958 1000 173276 154025 220043 28701 402769
27150
75050
47900
118050
90650
30
IR addition in 12th Plan (up to
March 2017)
Total IR (up to Oct-18)
IR at the end of 11th Plan
IR at the end of 12th Plan
Envisaged IR Capacity at the end
of 13th Plan
Grand Total
Note - The figure upto the end of 10th plan in for stringing progress including the lines not commissioned Now only commissioned lines are reckoned Accordingly the figure for 10th plan (end) may read as 187555 after adjusting with (-) 10852 Ckm
Inter-regional Power Transfer Capacity
plusmn 800 kV HVDC plusmn 500 kV HVDC 765 kV 400 kV 220 kV
File NoCEA-CH-14-1142018-Coordination Division
2004-05 27800
2005-06 28100
2006-07 30200
2007-08 33000
2008-09 35500
2009-10 36700
2010-11 38700
2011-12 41756
2012-13 45460
2013-14 48940
2014-15 53040
2015-16 54590
2016-17 57430
2017-18 60800
Year
2005-06
2006-07
2007-08
2008-09
2009-10
2010-11
2011-12
2012-13
2013-14
2014-15
2015-16
2016-17
2017-18
2004-05 254 209 7568
2005-06 260 221 7636
2006-07 276 227 7423
2007-08 293 239 7727
2008-09 340 263 8713
2009-10 355 268 8870
2010-11 398 303 11975
2011-12 455 330 13514
2012-13 501 376 14867
2013-14 518 175
2014-15 520
6719
7171
3 All India yearly Coal Consumption for Power Generation (Utilities)
YEARCoal Consumption
Million Tonnes
4 All India Annual per Capita consumption of Electricity Since 2006
Per Capita Consumption ( kWh)
6314
(GrossGen+ Net Import) Mid-year population
5 Average cost of power supply amp average realization ( paiseKWH )
Yearcost of supply
(paiseunit)
Realization(paiseunit)
Including AgricultureOnly
Agriculture
1149
7335
7786
91441
8188
88363
957
1010
1075
1122
File NoCEA-CH-14-1142018-Coordination Division
Source- PFC Reports on the performance of State Power Utilities 31
File NoCEA-CH-14-1142018-Coordination Division
Sl
NoExecuting Agency
Installed
Capacity (MW)Cost (Rs crore)
Date of
Clearance
32
No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification
since 2004-05
65291374575 296361511th Plan
Cumu upto End of 11th Plan
596556 21212860
557439Cummulative up to end of 12th Plan
46708
18423975
499150
2003-042004-05
5743
9769
Cumu upto End of 10th Plan
010407 to 310308
010410 to 310311557976840909
010411 to 310312
412667
86293726
3207
482864
12632
1576036
4451722594
15455554
2314176
397343611750
2093311060316074
65109527813884
6 Growth Of Rural Electrification amp Pumpsets Energisation
Plan Year
9th Plan2002-03
134092626
4111
Pump Sets Energised Villages Electricfied (Nos)
2001-02
284064367244
1218
27801997-981998-991999-002000-01
297594
010408 to 310309010409 to 310310
10th Plan
2005-062006-07
322968331020
Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as
Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received
from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made
available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified
villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is
independent of the earlier published reports
No Hydro Electric Project has been issued concurrenceAppraisal letter by CEA during October 2018
7 Status of Hydro Schemes Cleared by the CEA in Oct-2018
Name of Scheme
File NoCEA-CH-14-1142018-Coordination Division
SN Contents Page
1 Rate of sale of power for the year 2016-17 33-41
RATE OF SALE OF POWER FOR THE YEAR 2016-17
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) NORTHERN REGION
CENTRAL SECTOR
BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 18000 66900 19800
CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 54000 222400 21600
CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 30000 144400 19600
CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 23100 91700 42600
PARBATI - III HPS NHPC LTD HYDRO-HYDRO 52000 68200 54800
DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 28000 95600 30000
CHUTAK NHPC LTD HYDRO-HYDRO 4400 22000 79800
DULHASTI HPS NHPC LTD HYDRO-HYDRO 39000 228000 56400
SALAL HPS NHPC LTD HYDRO-HYDRO 69000 342300 11000
TANAKPUR HPS NHPC LTD HYDRO-HYDRO 9420 43000 29600
URI HPS -I NHPC LTD HYDRO-HYDRO 48000 280300 16000
URI HPS - II NHPC LTD HYDRO-HYDRO 24000 147300 48600
NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 4500 24600 88200
SEWA - II NHPC LTD HYDRO-HYDRO 12000 47100 43400
ANTA CCPP NTPC LTD THERMAL-GASN 41930 67539 32400
AURAIYA CCPP NTPC LTD THERMAL-GASN 66336 53501 39100
BADARPUR TPS NTPC LTD THERMAL-COAL 70500 159153 44800
DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 84000 296170 42300
DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 98000 526686 46300
DADRI CCPP NTPC LTD THERMAL-GASHSD 82978 227469 33000
FARIDABAD CCPP NTPC LTD THERMAL-GASN 43159 115577 30800
RIHAND STPS I NTPC LTD THERMAL-COAL 100000 596766 24500
RIHAND STPS II NTPC LTD THERMAL-COAL 100000 737069 24600
RIHAND STPS III NTPC LTD THERMAL-COAL 100000 706546 30600
SINGRAULI STPS NTPC LTD THERMAL-COAL 200000 1394068 20400
TANDA TPS NTPC LTD THERMAL-COAL 44000 295438 40800
UNCHAHAR TPS I NTPC LTD THERMAL-COAL 42000 256454 39800
UNCHAHAR TPS II NTPC LTD THERMAL-COAL 42000 273577 38900
UNCHAHAR TPS III NTPC LTD THERMAL-COAL 21000 142780 43000
KOLDAM NTPC LTD HYDRO-HYDRO 80000 363260 43600
NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 303575 25841
RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 108000 668677 35374
NJHPS SJVNL HYDRO-HYDRO 150000 699496 23820
RAMPUR HPS SJVNL HYDRO-HYDRO 41202 195982 32260
TEHRI HPP THDC HYDRO-HYDRO 100000 272543 51800
KOTESHWAR HEP THDC HYDRO-HYDRO 40000 106244 53400
IGSTPS JHAJJAR ARAVALI P CPL THERMAL-COAL 150000 510429 49490
NEYVELI BARSINGSAR NEYVELI LIG CORP LTD THERMAL-LIG 25000 127520 38040
STATE SECTOR
PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 21000 14222 48200
PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 21000 19205 48400
PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 25000 102257 42600
PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 25000 62107 41800
DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 60000 312213 41000
RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 120000 35767442200
WYC HYDEL STATION HPGCL HYDRO-HYDRO 6240 20365 24900
GIRI POWER HOUSE HPSEB HYDRO-HYDRO 6000 13958 7600
ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 1695 5467 11900
BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 12000 18528 6700
GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 2250 7462 22500
BASSI POWER HOUSE HPSEB HYDRO-HYDRO 6600 29649 7500
BINWA POWER HOUSE HPSEB HYDRO-HYDRO 600 2749 19300
ANNEXURE-I
RATE OF SALE OF POWER FOR THE YEAR 2016-2017
Page 33
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) GAJ POWER HOUSE HPSEB HYDRO-HYDRO 1050 2914 26700
BANER POWER HOUSE HPSEB HYDRO-HYDRO 1200 2864 16200
HOLI POWER HOUSE HPSEB HYDRO-HYDRO 300 616 22500
THIROT POWER HOUSE HPSEB HYDRO-HYDRO 450 1126 22500
KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 1200 3064 22500
LARJI POWER HOUSE HPSEB HYDRO-HYDRO 12600 53677 23700
NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 250 750 31000
CHABA POWER HOUSE HPSEB HYDRO-HYDRO 175 465 23300
RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 150 101 13400
SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 200 000 22500
KILLAR HPSEB HYDRO-HYDRO 030 050 22500
BHABA AUGUMENP H HPSEB HYDRO-HYDRO 450 1276 22500
BS CHAMBA HPSEB HYDRO-HYDRO 045 099 19500
GUMMA HPSEB HYDRO-HYDRO 300 423 22500
GAS TURBINE POWER STATION IPGCL THERMAL-GAS 27000 67233 39300
PPS-I PPCL THERMAL-GAS 33000 175905 38300
PPS-III PPCL THERMAL-GAS 137120 196879 36100
LOWER JHELUM JampKPDD HYDRO-HYDRO 10500 60214 5100
UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 2260 10514 6300
UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 10500 44202 8500
GANDHARBAL JampKPDD HYDRO-HYDRO 1500 8925 4700
KARNAH MPH JampKPDD HYDRO-HYDRO 200 1122 31000
CHENANI I JampKPDD HYDRO-HYDRO 2330 10892 6600
CHENANI II JampKPDD HYDRO-HYDRO 200 1188 9300
CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 750 3634 14200
IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 375 2108 18500
IGO MERCHELLONG JampKPDD HYDRO-HYDRO 300 1572 29700
PAHALGAM MHP JampKPDD HYDRO-HYDRO 450 1713 32900
MARPACHOO JampKPDD HYDRO-HYDRO 075 375 29800
HAFTAL JampKPDD HYDRO-HYDRO 100 483 28700
SANJAK JampKPDD HYDRO-HYDRO 126 441 36000
SEWA-III JampKPDD HYDRO-HYDRO 900 3273 20200
BHADERWAH JampKPDD HYDRO-HYDRO 150 935 8900
BAZGO JampKPDD HYDRO-HYDRO 030 108 33300
SUMOOR JampKPDD HYDRO-HYDRO 010 045 35400
HUNDER JampKPDD HYDRO-HYDRO 040 176 26200
STAKNA JampKPDD HYDRO-HYDRO 400 1933 4100
KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 124000 662879 31360
SURATGARH TPS RRVUNL THERMAL-COAL 150000 402328 41730
CHHABRA TPS 1amp 2 RRVUNL THERMAL-COAL 50000 305946 36700
CHHABRA TPS 3 RRVUNL THERMAL-COAL 25000 151536 36700
CHHABRA TPS 4 RRVUNL THERMAL-COAL 25000 155896 36700
RAMGARH GT POWER PROJECT RRVUNL THERMAL-COAL 22050 43177 41800
RAMGARH GAS T P PROJECT 3 RRVUNL THERMAL-GAS 5000 93615 41800
DHOLPUR C C POWER PROJECT RRVUNL THERMAL-R-LNG 33000 9486 46110
MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 14000 20855 34192
MINI MICRO HYDEL (MMH) P S RRVUNL HYDRO-HYDRO 2385 851 37800
KALISINDH TPP 1 RRVUNL THERMAL-COAL 60000 341543 45000
KALISINDH TPP 2 RRVUNL THERMAL-COAL 60000 211588 45000
KHARA HEP UPJVNL HYDRO-HYDRO 7200 26654 7200
MATATILLA HEP UPJVNL HYDRO-HYDRO 3060 12219 6500
OBRA HEP UPJVNL HYDRO-HYDRO 9900 21517 6300
RIHAND UPJVNL HYDRO-HYDRO 30000 57369 5500
ANPARA A TPS UPRVUNL THERMAL-COAL 63000 317536 27000
ANPARA B TPS UPRVUNL THERMAL-COAL 100000 705605 22700
ANPARA D UPRVUNL THERMAL-COAL 100000 300158 39800
HARDUAGANJ TPS UPRVUNL THERMAL-COAL 16500 45817 49200
HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 50000 304389 46600
OBRA A TPS UPRVUNL THERMAL-COAL 28800 13158 34000
OBRA B TPS UPRVUNL THERMAL-COAL 100000 328124 21900
Page 34
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) PANKI TPS UPRVUNL THERMAL-COAL 21000 66488 50300
PARICHHA TPS UPRVUNL THERMAL-COAL 22000 38762 49400
PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 42000 231931 45600
PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 50000 276722 50400
CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 24000 70845 8290
CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 14400 75366 8390
DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 3375 9595 12080
DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 5100 18701 10520
KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4140 17359 12330
KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 12000 33001 9420
KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 3000 11953 8320
TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 9000 33983 12460
MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 30400 124510 16110
RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 19800 17897 10550
MPUR UTTARAKHAND JVNL HYDRO-HYDRO 930 5121 19200
PATHRI UTTARAKHAND JVNL HYDRO-HYDRO 2040 11636 14200
GALOGI UTTARAKHAND JVNL HYDRO-HYDRO 300 648 12500
PRIVATE SECTOR
MGTPP CLP INDIA PVT LTD THERMAL-COAL 132000 268902 41940
SHRINAGAR HEP ALAKNANDA HPCL HYDRO-HYDRO 33000 127414 48800
GAMA INFRAPROP CCPP GAMA INFRAPROP PVT THERMAL-GAS 22500 52686 47000
PPGCL (BARA) JP POWER VENTURES LTD THERMAL-COAL 198000 448200 38500
MALANA HEP MALANA PCL HYDRO-HYDRO 8600 26354 29792
MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 10000 30369 32580
ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 19200 56347 36079
KASHANG HEP H P PCL HYDRO-HYDRO 19500 5034 29200
BASPA-II HEP HBPCL HYDRO-HYDRO 30000 132769 13600
KARCHAM WANGTOO HEP HBPCL HYDRO-HYDRO 100000 434386 36600
RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 108000 582600 43700
RITHALA COMBI CY POWER PLANT TATA POWER DDL THERMAL-GAS 9480 000 11900
RAJPURA TPS NABHA POWER LTD THERMAL-GAS 140000 901484 39000
TALWANDI SABO POWER LTD TALWANDI SABO POWER LTD THERMAL-COAL 198000 636040 49548
ROJA THERMAL POWER STATION ROJA POWER SCL THERMAL-COAL 120000 727200 43400
KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 34400 63400
BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 36000 62600
MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 38200 60800
UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 37900 61500
KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 42300 58800
LALITPUR PGCL BAJAJ ENERGY PVT LTD THERMAL-COAL 198000 359400 47300
PRAYAGRAJ PGCL PRAYAGRAJ PGCL THERMAL-COAL 132000 448200 38595
KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 132000 783182 33438
WESTERN REGION
CENTRAL SECTOR
INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 100000 325333 23892
OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 52000 141663 34001
GANDHAR CCPP NTPC LTD THERMAL-GAS 65739 221924 28700
KAWAS CCPP NTPC LTD THERMAL-GASN 65620 167929 27000
KORBA I amp II NTPC LTD THERMAL-COAL 210000 1499171 20500
KORBA III NTPC LTD THERMAL-COAL 50000 358746 26600
SIPAT STPS I NTPC LTD THERMAL-COAL 198000 1479902 26800
SIPAT STPS II NTPC LTD THERMAL-COAL 100000 766549 26500
VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 126000 693142 25800
VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 100000 608781 23800
VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 100000 673475 27600
VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 100000 655924 32900
VINDHYACHAL STPS V NTPC LTD THERMAL-COAL 50000 328265 31700
MOUDA I NTPC LTD THERMAL-COAL 100000 343130 44500
MOUDA Ii NTPC LTD THERMAL-COAL 66000 40637 39900
RATNAGIRI GAS amp POWER PVT LTD RGPPL THERMAL-GAS 196708 442485 47000
KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 000 24729
TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 32000 201227 10740
Page 35
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 365122 19069
TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 787444 29324
STATE SECTOR
GSEG-HAZIRA15610 MW GUJARAT S ENEGEN LTD THERMAL-GAS 15610 1805 28200
GSEG-HAZIRA35143 MW GUJARAT S ENEGEN LTD THERMAL-GAS 35130 22276 51300
GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 21978 51800
AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 13929 26100
KORBA TPS EAST CSPGCL THERMAL-COAL 44000 198673 33880
DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 365808 27570
KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 316500 30420
HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 532878 19410
CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 515 58300
MTTPS CHAMPA U-I CSPGCL THERMAL-COAL 50000 220376 39000
MTTPS CHAMPA U-II CSPGCL THERMAL-COAL 50000 23709 10000
SHP GANGREL CSPGCL HYDRO-HYDRO 1000 2350 36790
BANGO HEP CSPGCL HYDRO-HYDRO 12000 14662 8900
MHP KORBA WEST CSPGCL HYDRO-HYDRO 170 859 38190
SIKASAR HEP CSPGCL HYDRO-HYDRO 700 418 26870
DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8843 74500
DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 19446 51500
GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 66388 71600
GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127488 41300
KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 96072 43900
KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 29841 56400
SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 184966 58800
UKAI 1-5 GSECL THERMAL-COAL 85000 204891 46900
UKAI TPS 6 GSECL THERMAL-COAL 50000 284448 48200
WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 271999 58300
WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 82808 44100
KADANA HPS GSECL HYDRO-HYDRO 24200 34433 16800
UKAI HPS GSECL HYDRO-HYDRO 30500 40585 6100
TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 123000 11500
BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 8900 10900
BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 7200 27500
JHINNA HPS MPPGCL HYDRO-HYDRO 2000 9700 18500
RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 44300 3400
GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 17300 4600
SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 4100 16900
MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 14600 27000
PENCH HPS MPPGCL HYDRO-HYDRO 16000 23700 8100
RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 3000 16900
AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 134400 35100
SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 283800 38700
SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 344600 34300
SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 111600 61600
SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 211800 58000
SSTPS PH-I MPPGCL THERMAL-COAL 120000 233100 84300
BHUSAWAL TPS MSPGCL THERMAL-COAL 142000 566258 51100
CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1365682 33700
KHAPERKHEDA MSPGCL THERMAL-COAL 134000 706207 39100
KORADI TPS MSPGCL THERMAL-COAL 62000 443206 42000
NASIK TPS MSPGCL THERMAL-COAL 63000 297275 47000
PARLI TPS MSPGCL THERMAL-COAL 113000 175934 71600
PARAS MSPGCL THERMAL-COAL 50000 267931 38700
URAN CCPP MSPGCL THERMAL-GAS 67200 320330 30600
KOYANA MSPGCL HYDRO-HYDRO 195600 328155 13100
SMALL HYDRO POWER PLANTS MSPGCL HYDRO-HYDRO 45400 93062 30500
BHIRA MSPGCL HYDRO-HYDRO 8000 10046 8400
TILLARI MSPGCL HYDRO-HYDRO 8900 10584 3100
SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 233298 20500
SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 87633 20500
PRIVATE SECTOR
Page 36
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 81282 46750
JNSTPP(JAYPEE NIGRIE) JP POWER VENTURES LTD THERMAL-COAL 132000 726695 29310
MB POWER MB POWER THERMAL-COAL 120000 345632 38310
ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 754922 28671
ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 780761 23495
ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 198000 1263784 32090
ADANI POWER MAHARA ADANI POWER LTD THERMAL-COAL 330000 1666191 34124
AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 170065 36827
SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 252035 45129
ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 458551 36000
ESSAR POWER MP LTD ESSAR POWER MP LTD THERMAL-COAL 60000 243040 28600
VEDANTA LTD (P P -I) VEDANTA LTD THERMAL-GAS 3000 15044 24000
VEDANTA LTD (P P -II) VEDANTA LTD THERMAL-GAS 3000 21293 24000
PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 8234600 24000
165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 5850 64390
145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 68717 40349
SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 132655 28776
SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 144686 38567
MUNDRA UMPPCOASTAL GUJARAT POWER
LTD THERMAL-IMP COAL 400000 2530300
23900
LANCO AMARKANTAK TPP PATHADIH
U-ILANCO AMARKAN POWER LTD THERMAL-COAL 30000 195500
29200
LANCO AMARKANTAK TPP PATHADIH
U-IILANCO AMARKAN POWER LTD THERMAL-COAL 30000 206900
27600
BARADARHA TPS D B POWER LTD THERMAL-COAL 120000 677373 29200
JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 405000 28900
JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 453000 40500
DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 339437 40700
TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 293400 44000
TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 137200 37000
TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 174900 44000
BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 92900 14100
BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23700 34300
KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 27600 48300
CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2530300 23900
BHANDARDRA HEP -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 2475 54900
SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 161400 26500
SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 445000 39000
SOTHERN REGION
CENTRAL SECTOR
NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 325699 54820
NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 305532 39880
NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 998805 38510
NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 113016 54070
NEYVELI TAMILNADU POWER LTD JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 625274 42200
VALLUR TPS NTPC TECL THERMAL-COAL 150000 856438 42350
R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 1493 84300
RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1502919 29400
RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 341291 31800
SIMHADRI I NTPC LTD THERMAL-COAL 100000 688382 36800
SIMHADRI II NTPC LTD THERMAL-COAL 100000 663657 43400
KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 593110 31324
MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 291625 21764
KKNPP-1 amp 2 NPCIL NUCLEAR-NUCLEAR 200000 572609 40948
MINICOY LAKSHADEEP THERMAL-DIESEL 340 770 29600
KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1097 29600
AMINI LAKSHADEEP THERMAL-DIESEL 265 509 29600
ANDROTT LAKSHADEEP THERMAL-DIESEL 219 524 29600
KALPENI LAKSHADEEP THERMAL-DIESEL 175 356 29600
AGATTI LAKSHADEEP THERMAL-DIESEL 195 658 29600
KADMAT LAKSHADEEP THERMAL-DIESEL 190 414 29600
KILTAN LAKSHADEEP THERMAL-DIESEL 150 269 29600
CHETLET LAKSHADEEP THERMAL-DIESEL 100 139 29600
BITRA LAKSHADEEP THERMAL-DIESEL 043 024 29600
BANGARAM LAKSHADEEP THERMAL-DIESEL 018 009 29600
Page 37
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) STATE SECTOR
Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 721811 46500
Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 50000 336142 46500
RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 237358 46500
RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 239926 46500
RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 124500 46500
SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 62109 46500
UPPER SILERU APGENCO HYDRO-HYDRO 24000 33000 46500
LOWER SILERU APGENCO HYDRO-HYDRO 46000 81066 46500
DONKARAI APGENCO HYDRO-HYDRO 2500 6007 46500
PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 1262 46500
CHETTIPETA APGENCO HYDRO-HYDRO 100 214 46500
MUCHKUND APGENCO HYDRO-HYDRO 12000 37571 46500
NAGARJUNASAGAR RCPH APGENCO HYDRO-HYDRO 9000 606 46500
TUNGABHADRA HES amp HAMPI(AP
Share)
APGENCO HYDRO-HYDRO 7200 6100 46500
KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 352232 42600
KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 288131 32500
KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 319272 46500
RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 40073 44300
KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 308317 46000
KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 308963 51300
SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 61004 76600
NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 17960 75300
PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 20873 58300
POCHAMPAD-I TSPGENCO HYDRO-HYDRO 2700 5455 29800
POCHAMPAD-II TSPGENCO HYDRO-HYDRO 900 1932 40700
NIZAMSAGAR TSPGENCO HYDRO-HYDRO 1000 1126 53400
RAICHUR TPS 1 to 7 KPCL THERMAL-COAL 147000 890866 43800
RAICHUR TPS 8 KPCL THERMAL-COAL 25000 159523 48200
BELLARI TPS 1 KPCL THERMAL-COAL 50000 318679 51100
BELLARI TPS 2 KPCL THERMAL-COAL 50000 232347 55600
BELLARI TPS 3 KPCL THERMAL-COAL 70000 47565 34400
BHADRA PH KPCL HYDRO-HYDRO 3920 2369 45900
GERUSUPPA PH KPCL HYDRO-HYDRO 24000 26990 22000
GHAT PRABHA HEP KPCL HYDRO-HYDRO 3200 4777 25300
KADRA HPS KPCL HYDRO-HYDRO 15000 16889 26800
NAGJHARI KPCL HYDRO-HYDRO 90000 155159 9800
KODASALLI DPH KPCL HYDRO-HYDRO 12000 14854 19200
MUNIRA+MGH+SPH+SPH KPCL HYDRO-HYDRO 22640 48211 7900
SHARAVATHY HPS KPCL HYDRO-HYDRO 108550 276215 5400
ALMATTI DPH KPCL HYDRO-HYDRO 29000 39611 24600
VARAHI UGPH KPCL HYDRO-HYDRO 46000 71368 15600
IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 17196 15300
IDUKKI HPS KSEB HYDRO-HYDRO 78000 137905 15300
KAKKAD HPS KSEB HYDRO-HYDRO 5000 13063 15300
KALLADA HPS KSEB HYDRO-HYDRO 1500 4436 15300
KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 46544 15300
KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 635 15300
LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 30822 15300
MALANKARA HPS KSEB HYDRO-HYDRO 1050 2474 15300
MATTUPETTY KSEB HYDRO-HYDRO 200 230 15300
MALAMPUZHA KSEB HYDRO-HYDRO 250 063 15300
CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 864 15300
URUMI ST I amp II KSEB HYDRO-HYDRO 615 903 15300
LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 248 15300
NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7765 19625 15300
PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 16601 15300
PANNIAR HPS KSEB HYDRO-HYDRO 3240 6217 15300
PORINGALKUTHU KSEB HYDRO-HYDRO 3600 10052 15300
PORINGALKUTHU LBE KSEB HYDRO-HYDRO 1600 9438 15300
PEPPARA KSEB HYDRO-HYDRO 300 395 15300
POOZHITHODE KSEB HYDRO-HYDRO 480 1045 15300
Page 38
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) PEECHI KSEB HYDRO-HYDRO 125 040 15300
RANI-PERUNADU KSEB HYDRO-HYDRO 400 585 15300
SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 79783 15300
SENGULAM HPS KSEB HYDRO-HYDRO 5120 11558 15300
SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 16711 15300
VILANGAD KSEB HYDRO-HYDRO 750 1578 15300
BARAPOLE KSEB HYDRO-HYDRO 1500 1932 15300
VELLATHOOVAL KSEB HYDRO-HYDRO 360 305 15300
CHIM0NY KSEB HYDRO-HYDRO 250 156 15300
ADYANPARA KSEB HYDRO-HYDRO 350 501 15300
BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 554 15300
KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 3801 15300
KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 23132 32800
ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 14416 62280
METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 523970 62280
METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 321270 62280
NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 336575 62280
NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 591240 62280
TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 508966 62280
KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 30897 62280
VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 18720 90699 62280
KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 33593 62280
BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 1047 62280
PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 1250 62280
PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 330 62280
MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 4897 62280
MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 032 62280
KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15681 62280
KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 40608 62280
KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 21342 62280
KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 4717 62280
KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4322 62280
KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2399 62280
METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 4416 62280
METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 8035 62280
BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2187 62280
BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2359 62280
BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2511 62280
BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 1949 62280
BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 1819 62280
POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 172 62280
SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 241 62280
MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 026 62280
THIRUMOORTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 136 62280
PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 9309 62280
VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 353 62280
SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 4192 62280
PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 6571 62280
SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 1186 62280
SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6319 62280
ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 6122 62280
KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 28674 62280
SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 18381 62280
SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 4258 62280
KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 12680 62280
KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4201 62280
ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 000 62280
PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 19175 62280
AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 078 62280
BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 504 62280
BHAVANI KATTALAI (BKB)(IIIampIII BB I amp II)TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 5847 62280
PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 000 62280
Page 39
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) SRI DAMODARAM STPS APPDCL THERMAL-COAL 160000 808108 36300
PRIVATE SECTOR
KARUPPUR TANJORE LANCO TANJORE PCL THERMAL-GAS 12000 48096 28770
SIMHAPURI ENERGY LTD SIMHAPURI ENERGY LTD THERMAL-COAL 60000 143900 39100
JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 7111 45500
SBU 1 JSW ENERGY LTD
VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 26000 159100
43300
SBU 2 JSW ENERGY LTD
VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 60000 247900
42800
LANCO KPLLANCO KONDAPALLI POWER
LTDTHERMAL-GAS 36814 85060
25776
LANCO KPL STG -IILANCO KONDAPALLI POWER
LTDTHERMAL-GAS 36600 12979
46330
LANCO KPL STG -IIIALANCO KONDAPALLI POWER
LTDTHERMAL-GAS 37100 85710
46330
LANCO KPL STG -III BLANCO KONDAPALLI POWER
LTDTHERMAL-GAS 37100 43639
46330
HINDUJA NATIONAL PCL HINDUJA NATIONAL PCL THERMAL-COAL 104000 303000 38200
MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 121164 49940
UDUPI POWER COR LTD ADANI POWER LTD THERMAL-COAL 120000 754613 42500
SPECTRUM POWER GENERATION
LTD SPECTRUM PG LTD THERMAL-GASN 20525 9256812
34952
TAQA NEYVELI POWER COM PVT
LTD TAQA NEYVELI THERMAL-LIG 25000 5840
34500
ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 251000 51000
ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 207860 36800
GMR VEMAGIRI POWER GENERATION
LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 30117
46450
EASTERN REGION
CENTRAL SECTOR
MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 64675 53113
MTPS STAGE - II KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 39000 1432 69138
BOKARO `B` TPS DVC THERMAL-COAL 63000 145670 31539
MEJIA TPS U 1-3 DVC THERMAL-COAL 63000 348298 31552
MEJIA TPS U 4 DVC THERMAL-COAL 21000 116099 34997
MEJIA TPS U 5-6 DVC THERMAL-COAL 50000 276427 35976
MEJIA TPS U 7-8 DVC THERMAL-COAL 100000 552854 36991
DURGAPUR STEEL TPS DVC THERMAL-COAL 100000 665550 39323
DURGAPUR TPS DVC THERMAL-COAL 21000 59270 35416
RAGHUNATHPUR TPS DVC THERMAL-COAL 120000 201650 35326
MAITHON HYDEL STA DVC HYDRO-HYDRO 6320 12200 17984
CHANDRAPURA TPSU1-3 DVC THERMAL-COAL 42000 257610 35095
CHANDRAPURA TPSU7-8 DVC THERMAL-COAL 50000 306673 34987
KODERMA TPS DVC THERMAL-COAL 100000 380180 38131
PANCHET HPS DVC HYDRO-HYDRO 8000 13360 17984
TILLAYA HPS DVC HYDRO-HYDRO 400 1410 17984
RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34700 35400
TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 277300 23200
TLDP -III NHPC LTD HYDRO-HYDRO 13200 55400 62000
TLDP -IV NHPC LTD HYDRO-HYDRO 16000 60300 25600
FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 957219 33700
FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 308943 41000
BONGAINGAON TPS NTPC LTD THERMAL-COAL 25000 153663 58600
KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 542277 34200
KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 942591 34200
BARH-II NTPC LTD THERMAL-COAL 132000 728021 44500
TALCHER TPS NTPC LTD THERMAL-COAL 46000 335521 30100
TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 702319 25600
TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1436521 24700
STATE SECTOR
BTPS(RampM) BIHAR STATE PGCL THERMAL-COAL 22000 12142 39700
BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 98331 10602
HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 50593 9482
CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 19689 2605
RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 53192 6033
UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 147208 14637
Page 40
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 60353 4519
IB TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 288567 25000
J P H GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 210 038 61100
MEYONG CHU GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 400 1086 61100
TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 122667 38200
DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 214339 43321
KOLAGHAT THERMAL POWER
STATION
WEST BENGAL PDCL THERMAL-COAL 126000 538269 31603
BAKRESHWAR THERMAL POWER
PLANT
WEST BENGAL PDCL THERMAL-COAL 105000 634876 32154
BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 45000 166855 33299
SANTHALDIH THERMAL POWER
STATION
WEST BENGAL PDCL THERMAL-COAL 50000 336442 34932
SAGARDIGHI THERMAL POWER
PROJECT
WEST BENGAL PDCL THERMAL-COAL 160000 423121 34705
JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 20344 68900
RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 24559 68900
TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 4623 68900
PURULIA PUMPED STORAGE
PROJECT
WEST BENGAL SEDCL HYDRO-HYDRO 90000 108816 68900
MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2768 68900
PRIVATE SECTOR
CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 49474 20230
CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 555500 70200
HALDIA ENERGY HALDIA ENERGY LTD THERMAL-COAL 60000 371000 50400
DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3688 63400
KAMALANGA TPS GMR KAMALANGA ENERGY LTD THERMAL-COAL 105000547670
33300
ADHUNIK POWER U-1 ADHUNIK POWER THERMAL-COAL 27000 158 44060
ADHUNIK POWER U-2 ADHUNIK POWER THERMAL-COAL 27000 168 44250
VL-JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 332800 23622
JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 43000 45250
JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 71700 37030
JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 70700 35920
JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 71100 38870
JOJOBERA UNIT 5 TATA POWER COM LTD THERMAL-COAL 12000 79300 44560
JOJOBERA UNIT 6 TATA POWER COM LTD THERMAL-WHR 12000 83700 12840
IEL KALINGANAGAR U-I TATA POWER COM LTD THERMAL-WG 6750 33400 22500
IEL KALINGANAGAR U-II TATA POWER COM LTD THERMAL-WG 6750 34800 22500
MAITHON UNIT 1 amp 2 TATA POWER COM LTD THERMAL-COAL 105000 678000 36100
HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 27500 24340
HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 28400 24340
HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 15800 24310
NORTH EASTERN REGION
CENTRAL SECTOR
LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 74100 36600
AGARTALA GT NEEPCO THERMAL-GAS 13500 88611 27210
ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 153111 32310
DOYANG HEP NEEPCO HYDRO-HYDRO 7500 25598 49801
KOPILI HEP NEEPCO HYDRO-HYDRO 20000 98186 11491
KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 19582 20237
KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 10310 17968
RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 124093 22945
TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 10100 17344 39000
STATE SECTOR
HYDRO POWER (122 Stns) ITANAGAR GOVT OF ARUNACHAL
PRADESHHYDRO-HYDRO 6971 6217270
24600
KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39514 17337
LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 82327 36810
NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 33318 48290
MYNTRIANG SHEP ST II ASSAM POWER GENCO HYDRO-HYDRO 300 567 35776
LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 9130 49200
LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 012 49200
DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 022 49200
TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 000 49200
UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 4990 16000
UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 6476 37000
UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 16494 14600
UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 3600 9556 15000
SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 758 8000
MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44070 44800
KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 154 41400
TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 091 41400
MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 411 41400
MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 394 41400
KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 760 41400
SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 3264 41400
LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 044 41400
BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 18953 28000
ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 43585 28200
GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 4080 11100
Note
LIG Lignite N Naptha WHR Waste Heat Recovery
Page 41
File NoCEA-CH-14-1142018-Coordination Division
Sector
Coal Gas Diesel Total
State 6359650 711871 36393 7107913 000 2994200 200887 10303000
Private 7614600 1058060 47370 8720030 000 339400 6850164 15909594
Central 5625000 723791 000 6348791 678000 1215142 150230 8392163
All India 19599250 2493722 83763 22176734 678000 4548742 7201281 34604757
State 10303000
Private 15909594
Central 8392163
Electricity Generation (MU) Targets and Achievements for 2016-17
5 All India Installed Capacity (MW) Sector-wise as on 31-10-18
4
Grand TotalTHERMAL
Nuclear Hydro RES
RES as on 30092018
State 10303000 30
Private 15909594 46
Central 8392163 24
All India Installed Capacity(MW) as on 31-10-2018 (Sector-Wise)
File NoCEA-CH-14-1142018-Coordination Division
Voltage Level
+- 500 KV HVDC
+- 800 KV HVDC
765 KV
400 KV
220 KV
All India
Voltage Level
+- 500 KV HVDC
+- 800 KV HVDC
765 KV
400 kV
220 KV
All India
5
0 0
6 Transmission Lines Added during Oct-2018 (Ckms)
Oct-17 Oct-18
0 0
0 0
0 729
245 737
324 401
569 1867
Transmission Lines Added duringApril 2017- Oct 2017 ampApril 2018- Oct 2018 (Ckms)
April 2017- Oct 2017 April 2018- Oct 2018
2151 4521
13120 11799
0 0
2046 2464
8923 4814
569
1867
0
500
1000
1500
2000
All India
Ckm
s
Oct-17 Oct-18
13120
11799
11000
11500
12000
12500
13000
13500
All India
Ckm
s
April 2017- Oct 2017 April 2018- Oct 2018
File NoCEA-CH-14-1142018-Coordination Division
Voltage Level
+- 800 KV HVDC
+- 500 KV HVDC
765 KV
400 KV
220 KV
All India
Voltage Level
+- 800 KV HVDC
+- 500 KV HVDC
765 KV
400 KV
220 KV
All India
6
7 Transformation Capacity Addition During Oct-2018 (MVA)
0
0
2575
1025
0 0
Oct-17 Oct-18
3600
0
3000
9840
4620
2220
3000 0
All India Transformation Capacity Addition during April 2017- Oct 2017 amp April
2018- Oct 2018 (MVA)
41790
0
14000
17180
10610
45665
10000
23020
9645
0
April 2017- Oct 2017 April 2018- Oct 2018
3600
9840
0
2000
4000
6000
8000
10000
12000
MV
A
Oct-17 Oct-18
4566541790
0
74520
1
MV
A
April 2017- Oct 2017 April 2018- Oct 2018
File NoCEA-CH-14-1142018-Coordination Division
Oct-2017 Oct-2018 Oct-2017 Oct-2018 Oct-2017 Oct-2018
Northern 31786 31822 31096 31375 -22 -14
Western 31728 36308 31628 36178 -03 -04
Southern 24314 29392 24271 29342 -02 -02
Eastern 12012 12547 11931 12507 -07 -03
North Eastern 1487 1387 1451 1351 -24 -25
All India 101327 111455 100377 110753 -09 -06
Oct-2017 Oct-2018 Oct-2017 Oct-2018 Oct-2017 Oct-2018
Northern 51307 50659 50289 49635 -20 -20
Western 48530 56548 46392 55695 -44 -15
Southern 39142 45279 38905 45226 -06 -01
Eastern 19850 22959 19836 22567 -01 -17
North Eastern 2596 2790 2499 2700 -37 -32
All India 162027 172945 157394 170604 -29 -14
Oct-2018 Figures are Provisional
7
8 Power Supply Position (Energy amp Peak) in Oct-2018
Peak Demand Peak Met
Requirement Availability
Energy (MU)Region
Surplus(+)
Deficit (-) in
Surplus(+)
Deficit (-) in Region
Power (MW)
File NoCEA-CH-14-1142018-Coordination Division
Chandigarh Delhi Haryana HP JampK Punjab Rajasthan UP Utrakhand Oct-2017 0 0 0 0 516 0 0 0 0
Oct-2018 0 0 0 0 567 0 0 688 0
Chattisgarh Gujarat MP Maharastra Daman amp Diu Dadar Nagar Goa
Oct-2017 16 0 13 2062 0 0 25
Oct-2018 146 19 39 705 1 4 0
AP Telangana Karnataka Kerala Tamil Nadu Puducherry Lakshadweep
Oct-2017 18 19 0 211 38 2 0
Oct-2018 0 0 0 83 414 1 0
8
9 Peak Shortage of Power Supply (MW) in Different Regions in Oct-2018
0 0 0 0
567
0 0
688
00 0 0 0
516
0 0 0 0
0
400
800
Chan
dig
ar
h
Delh
i
Hary
ana
HP
Jamp
K
Pu
nj
ab
Raja
sth
an
UP
Utr
ak
hand
MW
Northern States (MW) Oct-2018 Oct-2017
146
19
39 705
1 4 016
0 13
2062
0 0 25
0
5000
Ch
attis
garh
Guja
rat
MP
Mah
ara
st
ra
Da
man amp
Diu
Da
dar
Na
gar G
oaM
W
Western States (MW) Oct-2018 Oct-2017
0 0 083
414
1 018 19 0
211
38 2 00
500
AP Telangana Karnataka Kerala Tamil Nadu Puducherry Lakshadweep
Southern State (MW) Oct-2018 Oct-2017
File NoCEA-CH-14-1142018-Coordination Division
Bihar DVC Jharkhand Odisha West Bengal Sikkim AampN Island
Oct-2017 6 0 0 0 8 0 4
Oct-2018 0 0 0 400 0 0 4
Arunachal Assam Manipur Meghalaya Mizoram Nagaland Tripura
Oct-2017 6 77 4 0 2 2 12
Oct-2018 13 81 2 0 2 3 0
9
0 0 0
400
0 0 46 0 0 0 8 0 4
0100200300400500
Bih
ar
DV
C
Jha
rkh
an
d
Od
ish
a
We
st
Be
ng
al
Sik
kim
Aamp
NIs
land
MW
Eastern States (MW) Oct-2018 Oct-2017
13
81
2 0 2 3 06 4 0 2 2
12
0
100
Aru
na
ch
al
Assa
m
Ma
nip
ur
Meghal
aya
Miz
ora
m
Na
gala
nd
Trip
ura
MW
North-Eastern States (MW)
File NoCEA-CH-14-1142018-Coordination Division
Sector Oct-2017 Oct-2018
Central 6872 7355
State 5217 6078
Private 6045 6819
ALL INDIA 5882 6524
Month PLF 2017 PLF 2018
Jan 6014 6288
Feb 6153 6285
March 6313 6558
April 6493 6458
May 6355 6554
June 5672 5917
July 537 5545
Aug 5733 5639
Sep 5989 6109
Oct 5882 6524
For Coal and Lignite based Power Plants and Provisional based on Actual-Cum-Assesment
10
PLF of Thermal Power Plants
All India PLF of Thermal Plants (Excluding Gas Based Plants) Month-wise
10 All India PLF Sector-wise for Oct-2018
68
72
52
17
60
45
58
8273
55
60
78
68
19
65
24
000
1000
2000
3000
4000
5000
6000
7000
8000
Central State Private ALL INDIA
P
LF
Oct-2017 Oct-2018
0
10
20
30
40
50
60
70
Jan Feb March April May June July Aug Sep Oct
Months
All India PLF Month-wise
PLF 2017 PLF 2018
File NoCEA-CH-14-1142018-Coordination Division
2012-13 2013-14 2014-15 2015-16 2016-17
TampD Losses 2304 2284 2277 2181 2142
ATampC Losses 2548 2258 2462
Note As per PFC for utilities selling directly to consumers
Total Number of Villages
597464
Note From the year 2004-05 onwards Definition of Village Electrification-
A village would be declared Electrified if
Without
Subsidy
Gap ACS-
ARR(
Without
Subsidy)
Paiseunit
Gap ACS-
ARR (on
subsidy
booked
basis)
paiseunit
Gap ACS-
ARR (on
subsidyrece
ived basis)
paiseunit
2013-14 400 118 76 77
2014-15 412 108 58 60
Source- PFC Reports on the performance of State Power Utilities
2013-14 4894
2014-15 5304
2015-16 5459
2016-17 5743
2017-18 6080
11
Average cost of supply(ACS)
(paiseunit)
i) Basic Infrastructure such as Distribution Transformer and Distribution lines are provided in the inhabited locality
as well as Dalit Basti hemlet where it exists (For electrification through Non-Conventional Energy Sources a
Distribution Transformer may not be necessary)
14 All India Coal consumption for Power Generation (MT)
520
Average Revenue Realization(paiseunit)
518
Year
ii) Electricity is provided to Public places like Schools Panchayat Office Health Centre Dispensaries Community
Centres etc and
iv) Mandatory Certification from Gram Panchayat regarding the completion of village electrification should be
obtained
13 Average cost of Power amp Average Realisation
iii) The number of households electrified should be at least 10 of the total number of households in the village
11 T amp D and ATampC Losses ()
12 All India Village Electrification
Villiages Electrified (Nos)
10000All villages as per census 2011 has
been electrified on 28042018
Villages electrified
File NoCEA-CH-14-1142018-Coordination Division
SN Contents Page
1 Capacity Addition Targets and Achievements in 12th Plan 12
2 Capacity Addition Targets amp Achievements during Oct-2018 and April 2018- Oct 2018 13
3 Installed Capacity in various Regions including their shares 14-19
Section B - Capacity Addition
File NoCEA-CH-14-1142018-Coordination Division
Figures in MW
TARGET ACH TARGET ACH TARGET ACH TARGET ACH
CENTRAL 14878 15869 6004 2584 5300 2000 26182 20453
STATE 13922 22201 1608 2276 0 0 15530 24477
PRIVATE 43540 53661 3285 619 0 0 46825 54280
ALL INDIA 72340 91730 10897 5479 5300 2000 88537 99209
Figures in MW
Thermal Hydro Nuclear Total
Target Ach Target Ach Target Ach Target Ach
Central 4880 3170 800 390 500 6180 3560 5761
State 3546 1760 300 200 0 3846 1960 5096
Private 2940 3780 205 205 0 3145 3985 12671
Total 11366 8710 1305 795 500 0 13171 9505 7217
12
2 CAPACITY ADDITION TARGET AND ACHIEVEMENT FOR 2017-18 (IN MW)
1 Capacity Addtion Targets and Achievements in the 12th Plan
SECTORTHERMAL HYDRO NUCLEAR TOTAL
File NoCEA-CH-14-1142018-Coordination Division
(MW)
Cummulative
Deviation
Target Achievement Target Achievement (+) (-)
Central 2760 250 0 250 0 -250
State 450615 1030 0 1030 69755 -960245
Private 0 0 600 0 600 600
Total 726615 1280 600 1280 669755 -610245
Central 710 0 0 110 110 0
State 130 0 0 12999 30 -9999
Private 0 0 0 0 0 0
Total 840 0 0 23999 140 -9999
Nuclear Central 0 0 0 0 0 0
Central 3470 250 0 360 110 -250
State 463615 1030 0 115999 99755 -1060235
Private 0 0 600 0 600 600
Total 810615 1280 600 151999 809755 -710235
Electricity Generation (MU) Targets and Achievements for 2016-17
13
2 Capacity Addition Targets Achievements During Oct-2018
Schemes Sector
Target 2018-19
April 2018- Oct 2018Oct-18
Hydro
All India
Capacity Addition TargetsAchievements during the Month of Oct-2018
Thermal
12
80
24
0
0
15
20
67
0
14
0
0
81
0
0
200
400
600
800
1000
1200
1400
1600
Thermal Hydro Nuclear Total
MW
Targets and Achievement during 2018-19Target Achievement
600
0 00 0
600
0
100
200
300
400
500
600
700
800
900
1000
Target Achievement
MW
Targets and Achievement during Oct 2018Thermal Hydro
Nuclear Total
File NoCEA-CH-14-1142018-Coordination Division
Coal Gas Diesel Total
State 1593400 287920 000 1881320 000 869755 68956 2820031
Private 2276083 55800 000 2331883 000 251400 1261535 3844818
Central 1258537 234406 000 1492943 162000 849622 32900 2537465
Sub Total 5128020 578126 000 5706146 162000 1970777 1363391 9202314
State 2128000 284982 000 2412982 000 544650 31119 2988751
Private 3488567 467600 000 3956167 000 48100 2005170 6009437
Central 1504295 328067 000 1832362 184000 162000 66130 2244492
Sub Total 7120862 1080649 000 8201511 184000 754750 2102418 11242679
State 1943250 79198 28788 2051236 000 1183803 52102 3287141
Private 1212450 532210 47370 1792030 000 000 3495815 5287845
Central 1422502 35958 000 1458460 332000 000 49190 1839650
Sub Total 4578202 647366 76158 5301726 332000 1183803 3597107 10414636
State 695000 10000 000 705000 000 353792 22511 1081303
Private 637500 000 000 637500 000 39900 84853 762253
Central 1387664 000 000 1387664 000 100520 1000 1489184
Sub Total 2720164 10000 000 2730164 000 494212 108364 3332740
State 000 49771 3600 53371 000 42200 25674 121245
Private 000 2450 000 2450 000 000 2571 5021
Central 52002 125360 000 177362 000 103000 500 280862
Sub Total 52002 177581 3600 233183 000 145200 28745 407128
State 000 000 4005 4005 000 000 525 4530
Private 000 000 000 000 000 000 221 221
Central 000 000 000 000 000 000 510 510
Sub Total 000 000 4005 4005 000 000 1256 5261
State 6359650 711871 36393 7107913 000 2994200 200887 10303000
Private 7614600 1058060 47370 8720030 000 339400 6850164 15909594
Central 5625000 723791 000 6348791 678000 1215142 150230 8392163
Total 19599250 2493722 83763 22176734 678000 4548742 7201281 34604757
Figures at decimal may not tally due to rounding off
Note -
(As per latest information available with MNRE)
Break up of RES all India as on 30092018 is given below (in MW)
450695 3461510 2402166 7201281
A Oct 2018 669755 MW
B Capacity Retired
during
Oct 2018 705 MW
C Oct 2018 0 MW
D Oct 2018 A-B+C -35245 MW
Share of Telangana from JEGURUPADU CCPP Ph II has been removed and the same has been added to private sector of Andhra Pradesh due to expiry of PPA as per
request from TS Transco
Region
ALL INDIA INSTALLED CAPACITY (IN MW) OF POWER STATIONS (As on 31102018)
(UTILITIES)
Net Capacity Added during
1 RES include SHP BP UampI Solar and Wind Energy Installed capacity in respect of RES (MNRE) as on 30092018
Small
Hydro PowerWind Power
Bio-PowerSolar Power
Total
CapacityBM PowerCogen Waste to Energy
2 U-1 to 7 (76995=69755 MW) of LAKWA REPLACEMENT POWER PROJECT commissioned in April 2018 but intimated in October 2018
has been added to state sector of Assam
1 Badarpur TPS (705 MW) has been retired from central sector of Northern Region
Capacity Up-rated
Ownership Sector
873080 13830
Capacity Added during
1 U-2 (600 MW) of MAHAN TPP has been commissioned and added to private sector of Madhya Pradesh
Grand TotalThermalNuclear Hydro
Islands
ALL INDIA
Abbreviation- SHP=Small Hydro Project (le 25 MW) BP=Biomass Power UampI=Urban amp Industrial Waste Power RES=Renewable Energy Sources
Northern Region
Western Region
Southern Region
Eastern Region
North Eastern
Region
RES
(MNRE)
Modewise breakup
File NoCEA-CH-14-1142018-Coordination Division
Coal Gas Diesel Total
State 13500 180040 000 193540 000 000 000 193540
Private 86922 10800 000 97722 000 000 12157 109879
Central 311272 20701 000 331973 10283 72309 000 414565
Sub-Total 411694 211541 000 623235 10283 72309 12157 717984
State 272000 15000 000 287000 000 110282 5930 403212
Private 408078 000 000 408078 000 20000 34745 462823
Central 129472 53561 000 183034 10094 66370181 500 259998
Sub-Total 809550 68561 000 878112 10094 196652 41175 1126032
State 000 000 000 000 000 69460 25661 95121
Private 000 000 000 000 000 99200 60536 159736
Central 18340 6201 000 24541 2895 122388 000 149824
Sub-Total 18340 6201 000 24541 2895 291048 86197 404681
State 000 17500 000 17500 000 123000 12903 153403
Private 000 000 000 000 000 000 5985 5985
Central 50639 12907 000 63547 6798 109188 000 179533
Sub-Total 50639 30407 000 81047 6798 232188 18888 338921
State 176000 15000 000 191000 000 259770 12780 463550
Private 511550 000 000 511550 000 28800 115462 655812
Central 85458 26401 000 111859 19681 92342 000 223882
Sub-Total 773008 41401 000 814409 19681 380912 128242 1343244
State 585000 60380 000 645380 000 109618 2385 757383
Private 388200 000 000 388200 000 10400 710680 1109280
Central 120625 22110 000 142735 55674 73901 29400 301710
Sub-Total 1093825 82490 000 1176315 55674 193919 742465 2168373
State 546900 000 000 546900 000 72410 2510 621820
Private 871433 000 000 871433 000 84200 266691 1222324
Central 379639 54949 000 434588 28948 180253 3000 646789
Sub-Total 1797972 54949 000 1852921 28948 336863 272201 2490933
State 000 000 000 000 000 125215 6787 132002
Private 9900 45000 000 54900 000 8800 52244 115944
Central 34324 6966 000 41290 3124 47554 000 91968
Sub-Total 44224 51966 000 96190 3124 181569 59031 339914
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 3035 3035
Central 3815 1503 000 5317 801 10171 000 16289
Sub-Total 3815 1503 000 5317 801 10171 3035 19324
124953 29105 000 154058 23703 75145 000 252907
State 1593400 287920 000 1881320 000 869755 68956 2820031
Private 2276083 55800 000 2331883 000 251400 1261535 3844818
Central 1258537 234406 000 1492943 162000 849622 32900 2537465
Grand Total 5128020 578126 000 5706146 162000 1970777 1363391 9202314
Uttar Pradesh
Uttarakhand
Chandigarh
Grand TotalThermalNuclear
Hydro
(Renewable)
RES
(MNRE)
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
NORTHERN REGION
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
(As on 31102018)
Central - Unallocated
Total (Northern
Region)
Delhi
Haryana
Himachal Pradesh
Jammu amp Kashmir
Punjab
Rajasthan
State Ownership Sector
Modewise breakup
File NoCEA-CH-14-1142018-Coordination Division
(As on 31102018)
Coal Gas Diesel Total
State 000 000 000 000 000 000 005 005
Private 000 4800 000 4800 000 000 091 4891
Central 45478 1967 000 47445 2600 000 000 50045
Sub-Total 45478 6767 000 52245 2600 000 096 54941
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 1301 1301
Central 12663 4334 000 16997 700 000 000 17697
Sub-Total 12663 4334 000 16997 700 000 1301 18998
State 475000 217782 000 692782 000 77200 800 770782
Private 776567 396000 000 1172567 000 000 729782 1902349
Central 309051 42400 000 351451 55900 000 23830 431181
Sub-Total 1560618 656182 000 2216800 55900 77200 754412 3104312
State 408000 000 000 408000 000 170366 8396 586762
Private 617400 10000 000 627400 000 000 378205 1005605
Central 279441 25700 000 305141 27300 152000 30000 514441
Sub-Total 1304841 35700 000 1340541 27300 322366 416601 2106808
State 228000 000 000 228000 000 12000 1105 241105
Private 849000 000 000 849000 000 000 52430 901430
Central 195344 000 000 195344 4800 10000 000 210144
Sub-Total 1272344 000 000 1272344 4800 22000 53535 1352679
State 1017000 67200 000 1084200 000 285084 20813 1390097
Private 1245600 56800 000 1302400 000 48100 842815 2193315
Central 433475 227273 000 660748 69000 000 12300 742048
Sub-Total 2696075 351273 000 3047348 69000 333184 875927 4325459
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 546 546
Central 17444 6634 000 24078 900 000 000 24978
Sub-Total 17444 6634 000 24078 900 000 546 25524
211400 19759 000 231159 22800 000 000 253959
State 2128000 284982 000 2412982 000 544650 31119 2988751
Private 3488567 467600 000 3956167 000 48100 2005170 6009437
Central 1504295 328067 000 1832362 184000 162000 66130 2244492
Grand Total 7120862 1080649 000 8201511 184000 754750 2102418 11242679
Central - Unallocated
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
WESTERN REGION
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
State Ownership Sector
Modewise breakup
Grand TotalThermalNuclear
Hydro
(Renewable)
RES
(MNRE)
Total (Western
Region)
Goa
Daman amp Diu
Gujarat
Madhya Pradesh
Chhattisgarh
Maharashtra
Dadra amp Nagar
Naveli
File NoCEA-CH-14-1142018-Coordination Division
(As on 31102018)
Coal Gas Diesel Total
State 501000 23540 000 524540 000 167360 4875 696775
Private 387388 381318 3680 772386 000 000 693073 1465459
Central 167456 000 000 167456 12727 000 25000 205183
Sub-Total 1055844 404858 3680 1464382 12727 167360 722948 2367417
State 508250 000 000 508250 000 247993 4022 760265
Private 83945 83182 000 167127 000 000 375048 542175
Central 195612 000 000 195612 14873 000 1000 211485
Sub-Total 787807 83182 000 870989 14873 247993 380070 1513925
State 502000 000 12792 514792 000 359980 15533 890305
Private 195850 000 2520 198370 000 000 1275640 1474010
Central 282920 000 000 282920 69800 000 000 352720
Sub-Total 980770 000 15312 996082 69800 359980 1291173 2717035
State 000 000 15996 15996 000 188150 15402 219548
Private 61500 17400 000 78900 000 000 20899 99799
Central 114322 35958 000 150280 36200 000 5000 191480
Sub-Total 175822 53358 15996 245176 36200 188150 41301 510827
State 432000 52408 000 484408 000 220320 12270 716998
Private 483767 50310 41170 575247 000 000 1130984 1706231
Central 448952 000 000 448952 144800 000 18190 611942
Sub-Total 1364719 102718 41170 1508607 144800 220320 1161444 3035171
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 000 000
Central 10000 000 000 10000 000 000 000 10000
Sub-Total 10000 000 000 10000 000 000 000 10000
State 000 3250 000 3250 000 000 000 3250
Private 000 000 000 000 000 000 171 171
Central 24840 000 000 24840 8600 000 000 33440
Sub-Total 24840 3250 000 28090 8600 000 171 36861
178400 000 000 178400 45000 000 000 223400
State 1943250 79198 28788 2051236 000 1183803 52102 3287141
Private 1212450 532210 47370 1792030 000 000 3495815 5287845
Central 1422502 35958 000 1458460 332000 000 49190 1839650
Grand Total 4578202 647366 76158 5301726 332000 1183803 3597107 10414636
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
SOUTHERN REGION
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
State Ownership Sector
Modewise breakup
Grand TotalThermal RES
(MNRE)Nuclear
Hydro
(Renewable)
Kerala
Tamil Nadu
NLC
Puducherry
Central - Unallocated
Total (Southern
Region)
Andhra Pradesh
Telangana
Karnataka
File NoCEA-CH-14-1142018-Coordination Division
(As on 31102018)
Coal Gas Diesel Total
State 71000 000 000 71000 000 000 7070 78070
Private 28100 000 000 28100 000 000 25545 53645
Central 291433 000 000 291433 000 11000 000 302432
Sub-Total 390533 000 000 390533 000 11000 32615 434147
State 42000 000 000 42000 000 13000 405 55405
Private 73000 000 000 73000 000 000 3207 76207
Central 39374 000 000 39374 000 6100 000 45474
Sub-Total 154374 000 000 154374 000 19100 3612 177086
State 540000 10000 000 550000 000 98600 9195 657795
Private 242500 000 000 242500 000 000 34452 276952
Central 76077 000 000 76077 000 41000 000 117077
Sub-Total 858577 10000 000 868577 000 139600 43647 1051824
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 000 000
Central 698504 000 000 698504 000 18620 000 717124
Sub-Total 698504 000 000 698504 000 18620 000 717124
State 42000 000 000 42000 000 206192 630 248822
Private 293900 000 000 293900 000 000 21648 315548
Central 163390 000 000 163390 000 8900 1000 173290
Sub-Total 499290 000 000 499290 000 215092 23278 737660
State 000 000 000 000 000 36000 5211 41211
Private 000 000 000 000 000 39900 001 39901
Central 8703 000 000 8703 000 6400 000 15103
Sub-Total 8703 000 000 8703 000 82300 5212 96215
110183 000 000 110183 000 8501 000 118684
State 695000 10000 000 705000 000 353792 22511 1081303
Private 637500 000 000 637500 000 39900 84853 762253
Central 1387664 000 000 1387664 000 100520 1000 1489184
Grand Total 2720164 10000 000 2730164 000 494212 108364 3332740
(As on 31102018)
Coal Gas Diesel Total
State 000 32821 000 32821 000 10000 3001 45822
Private 000 2450 000 2450 000 000 1680 4130
Central 27902 43556 000 71458 000 36851 000 108309
Sub-Total 27902 78827 000 106729 000 46851 4681 158261
State 000 000 000 000 000 000 10710 10710
Private 000 000 000 000 000 000 539 539
Central 2470 4682 000 7152 000 11800 000 18952
Sub-Total 2470 4682 000 7152 000 11800 11249 30201
State 000 000 000 000 000 32200 3103 35303
Private 000 000 000 000 000 000 006 006
Central 3040 10969 000 14009 000 7446 000 21455
Sub-Total 3040 10969 000 14009 000 39646 3109 56764
State 000 16950 000 16950 000 000 1601 18551
Private 000 000 000 000 000 000 009 009
Central 3740 43695 000 47435 000 7077 500 55012
Sub-Total 3740 60645 000 64385 000 7077 2110 73572
State 000 000 3600 3600 000 000 545 4145
Private 000 000 000 000 000 000 217 217
Central 3140 7157 000 10297 000 9677 000 19974
Sub-Total 3140 7157 3600 13897 000 9677 762 24336
State 000 000 000 000 000 000 3067 3067
Private 000 000 000 000 000 000 100 100
Central 2140 4893 000 7033 000 5860 000 12893
Sub-Total 2140 4893 000 7033 000 5860 3167 16060
State 000 000 000 000 000 000 3647 3647
Private 000 000 000 000 000 000 020 020
Central 2070 4046 000 6116 000 9913 000 16029
Sub-Total 2070 4046 000 6116 000 9913 3667 19696
7500 6362 000 13862 000 14376 000 28238
State 000 49771 3600 53371 000 42200 25674 121245
Private 000 2450 000 2450 000 000 2571 5021
Central 52002 125360 000 177362 000 103000 500 280862
Grand Total 52002 177581 3600 233183 000 145200 28745 407128
Central - Unallocated
Total (Eastern
Region)
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
NORTH-EASTERN REGION
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
State Ownership Sector
Modewise breakup
Grand TotalThermalNuclear
Bihar
Jharkhand
West Bengal
DVC
Odisha
Sikkim
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
EASTERN REGION
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
Ownership Sector
Modewise breakup
Grand TotalThermalNuclear
Hydro
(Renewable)
RES
(MNRE)
Manipur
Nagaland
State
Mizoram
Central - Unallocated
Total (North-
Eastern Region)
Hydro
(Renewable)
RES
(MNRE)
Assam
Arunachal Pradesh
Meghalaya
Tripura
File NoCEA-CH-14-1142018-Coordination Division
(As on 31102018)
Coal Gas Diesel Total
State 000 000 4005 4005 000 000 525 4530
Private 000 000 000 000 000 000 146 146
Central 000 000 000 000 000 000 510 510
Sub-Total 000 000 4005 4005 000 000 1181 5186
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 075 075
Central 000 000 000 000 000 000 000 000
Sub-Total 000 000 000 000 000 000 075 075
State 000 000 4005 4005 000 000 525 4530
Private 000 000 000 000 000 000 221 221
Central 000 000 000 000 000 000 510 510
Grand Total 000 000 4005 4005 000 000 1256 5261
19
Andaman amp
Nicobar
lakshadweep
Total (Islands)
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
State Ownership Sector
Modewise breakup
Grand TotalThermalNuclear
Hydro
(Renewable)
RES
(MNRE)
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
ISLANDS
File NoCEA-CH-14-1142018-Coordination Division
SrNo Contents Page
1 Executive summary of Target and Achievement of Transmission Lines during 2018-19
20(1)
2 List of Transmission Lines CommissionedReady for commissioning during Oct-2018 20(2)
Section C - Transmission Lines
File NoCEA-CH-14-1142018-Coordination Division
Executive summary of Target and Achievement of Transmission Lines during 2018-19 As on Oct-18
(All figures in circuit kms)
Centr
al S
ecto
r
Sta
te S
ecto
r
JV
Private
Secto
r
To
tal
Centr
al S
ecto
r
Sta
te S
ecto
r
JV
Private
Secto
r
To
tal
Centr
al S
ecto
r
Sta
te S
ecto
r
JV
Private
Secto
r
To
tal
Centr
al S
ecto
r
Sta
te S
ecto
r
JV
Private
Secto
r
To
tal
Centr
al S
ecto
r
Sta
te S
ecto
r
JV
Private
Secto
r
To
tal
Cen
tral S
ecto
r
Sta
te S
ecto
r
JV
Pri
vate
Secto
r
Gra
nd
To
tal
0 0 0 0 0 0 0 0 4692 766 827 6285 3045 5906 980 9931 553 5878 0 6431 8290 12550 1807 22647
Oct18 Programme 0 0 0 0 0 0 0 0 300 0 0 300 662 90 562 1314 0 723 0 723 962 813 562 2337
Achievement 0 0 0 0 0 0 0 0 729 0 0 729 471 266 0 737 0 401 0 401 1200 667 0 1867
Upto Oct-18 Programme 0 0 0 0 0 0 0 0 3004 416 0 3420 1350 3109 562 5021 481 4346 0 4827 4835 7871 562 13268
Achievement 0 0 0 0 0 0 0 0 2286 0 178 2464 1436 1783 1595 4814 60 4461 0 4521 3782 6244 1773 11799
20(1)
220 kV Grand Total 800 kV 500 kV
Programme 2018-19
Programme
Achievement
HVDC765 kV 400 kV
File NoCEA-CH-14-1142018-Coordination Division
SlNo Line
Length
(cKM)
1 2 3 4 5 6
1 765 Jharsuguda - Dharamjaygarh line DC PGCIL 296
2 765LILO of Kurnool - Thirvualam line at
CuddapahDC PGCIL 190
3 765 Salem PS - Madhugiri PS line SC PGCIL 243
4 400 Cuddapah - Hindupur line (Q) DC PGCIL 338
5 400LILO of Both Ckt of Bamnauli - Samaypur at
TughlakabadMC PGCIL 114
6 400LILO-Out of Cuddapah - Hindupur line (Q)
(Both Ckts) at NP Kunta ssDC PGCIL 19
1200
7 400LILO of Sterlite - Meramundali at Lapanga
4oo kV ssDC OPTCL 14
8 400 Sterlite - Lapanga line DC OPTCL 37
9 400 TMDC Podili - Sattapenalli line DC APTRANSCO 215
10 230Neyveli 230110 kV ss - Eachangadu
230kV FeederSC TANTRANSCO 1
11 230 NNTPS - Neyveli 230110kV ss DC TANTRANSCO 2
12 220 Ajmer (400 kV) - Bherunda (TK) DC RVPNL 100
13 220 Aligarh - Atrauli line DC UPPTCL 77
14 220 Khandwa - Chhanera line DC MPPTCL 78
15 220LILO of one Ckt of Hadala - Sartanpar line
at Wankaner on MC towersDC GETCO 6
16 220 LILO of one Ckt of Vita - Miraj at Alkud ss DC MSETCL 27
17 220 Mendhigiri - Alkud ss DC MSETCL 110
667
1867
20(2)
Grand Total
2Transmission Lines (220 kV and above) CommissionedReady for commissioning During Oct-2018
As on 31-10-18
Voltage
Level (kV)Name of Transmission Lines
Circuit
Type
Executing
Agency
CENTRAL SECTOR
Total of CENTRAL SECTOR
STATE SECTOR Sector
Total of STATE SECTOR
File NoCEA-CH-14-1142018-Coordination Division
SN Contents Page
1 Executive summary of Target and Achievement of Substations during 2018-19 21(1)
2Sub Stations (220 kV and above) commissionedready for commisssioning during Oct-
201821(2)
Section D - Sub Stations
File NoCEA-CH-14-1142018-Coordination Division
1 Executive summary of Target and Achievement of Substations during 2018-19 As on Oct-18
(All figures in circuit MVA)
Centr
al S
ecto
r
Sta
te S
ecto
r
JV
Private
Secto
r
To
tal
Centr
al S
ecto
r
Sta
te S
ecto
r
JV
Private
Secto
r
To
tal
Centr
al S
ecto
r
Sta
te S
ecto
r
JV
Private
Secto
r
To
tal
Centr
al S
ecto
r
Sta
te S
ecto
r
JV
Private
Secto
r
To
tal
Centr
al S
ecto
r
Sta
te S
ecto
r
JV
Private
Secto
r
To
tal
Cen
tral S
ecto
r
Sta
te S
ecto
r
JV
Pri
vate
Secto
r
Gra
nd
To
tal
3000 0 0 3000 0 0 0 0 22200 0 0 22200 8185 13085 630 21900 740 14760 0 15500 34125 27845 630 62600
Oct18 Programme 0 0 0 0 0 0 0 0 0 0 0 0 1000 1260 630 2890 0 1400 0 1400 1000 2660 630 4290
Achievement 0 0 0 0 0 0 0 0 3000 0 0 3000 1500 3120 0 4620 0 2220 0 2220 4500 5340 0 9840
Upto Oct-18 Programme 0 0 0 0 0 0 0 0 10000 0 0 10000 6130 7435 630 14195 0 9670 0 9670 16130 17105 630 33865
Achievement 0 0 0 0 0 0 0 0 14000 0 0 14000 9000 7550 630 17180 0 10610 0 10610 23000 18160 630 41790
21(1)
220 kV Grand Total 800 kV 500 kV
Programme 2018-19
Programme
Achievement
HVDC765 kV 400 kV
File NoCEA-CH-14-1142018-Coordination Division
As on 31-10-18
Sl Voltage Ratio Capacity
No (kVkV) (MWMVA)
1 2 3 4 5
1 Cuddapah Ss 765400 PGCIL 3000
2 Tughlakabad SS (GIS) 400220 PGCIL 1500
Total of CENTRAL SECTOR 4500
3 Panki Kanpur (Aug) TF-I 400200 UPPTCL 75
4 Hindupur ss (1st ICT) 400220 APTRANSCO 315
5 Thappagundu ss 400110 TANTRANSCO 600
6 Mendhasal (2nd power TF) 400220 OPTCL 20
7 Jodhpur ss (New) 400220 RVPNL 315
8 Shankarpally 400220 TSTRANSCO 500
9 Podili ss (1st ICT) 400220 APTRANSCO 315
10 Doni (Gadag)SS 400220 KPTCL 1000
11 Porur (Addl TF) 230110 TANTRANSCO 100
12 Anuppankulam (Addl TF) 230110 TANTRANSCO 60
13 Neyveli SS 230110 TANTRANSCO 480
14 Savarkundla (Aug) 22066 GETCO 60
15 Bhuna (Aug) 220132 HVPNL 100
16 Madanpur (Aug) 22066 HVPNL 100
17 Gurgaon Sec-52A (Aug) 22066 HVPNL 160
18 IA Hisar (Aug) 220132 HVPNL 50
19 Narwana (Aug) 220132 HVPNL 60
20 Therubali (3rd Auto TF) 220132 OPTCL 160
21 Halasar ss 220132 RVPNL 160
22 Bansi Siddaharthnagar (Aug) TF-I 220132 UPPTCL 60
23 Hata Kushinagar (New) TF-I 220132 UPPTCL 100
24 Gomti nagar Lucknow (Aug) TF-IV 22033 UPPTCL 60
25 Kanpur Road Lucknow (New) TF-III 22033 UPPTCL 60
26 Asoj (Aug) 22066 GETCO 150
27 Kangasiyali (Aug) 22066 GETCO 60
28 Karmsad (Aug) 22066 GETCO 160
29 Lalpar (Aug) 22066 GETCO 60
TOTAL STATE SECTOR 5340
GRAND TOTAL 9840
21(2)
PRIVATE SECTOR
CENTRAL SECTOR
STATE SECTOR
2Sub-Stations (220 kV and above) CommissionedReady for commissioning During Oct-2018
Name of Sub StationsExecuting
Agency
File NoCEA-CH-14-1142018-Coordination Division
SN Contents Page
1 Electricity Generation (MU) Targets and Achievements for 2018-19 22
Section E - Electricity Generation
File NoCEA-CH-14-1142018-Coordination Division
Programme Achievement Ach Programme Achievement Ach
Central Sector 35160700 3028100 3162321 10443 20144400 21150469 10499
State Sector 35132000 3010000 3017260 10024 19922100 19549030 9813
PvtIPP Sector 36999700 3240600 3375603 10417 21598300 20794155 9628
PvtUTL Sector 1857600 164500 180597 10979 1130900 1203107 10638
Total 109150000 9443200 9735781 10310 62795700 62696761 9984
Central Sector 5617600 420900 451004 10715 4193000 4045436 9648
State Sector 6110600 559500 708469 12663 4049400 4433000 10947
PvtIPP Sector 1141800 80500 90122 11195 976400 1021963 10467
PvtUTL Sector 130000 11300 12564 11119 76700 99943 13030
Total 13000000 1072200 1262159 11772 9295500 9600342 10328
Central Sector 3850000 353300 303310 8585 2068900 2203540 10651
Total 3850000 353300 303310 8585 2068900 2203540 10651
Bhutan Import 500000 63300 35395 5592 347000 416660 12007
Central Sector 44628300 3802300 3916635 10301 26406300 27399445 10376
State Sector 41242600 3569500 3725729 10438 23971500 23982030 10004
Pvt Sector 40129100 3496900 3658886 10463 23782300 23119168 9721
Total 126500000 10932000 11336645 10370 74507100 74917303 10055
Provisional based on actual-cum-Assesment
Figs in MU
Cummulative
Achievement
Cummulative
Achievement
Sep-18 Sep-17 Upto Sep-2018 Upto Sep-2017
1073794 748889 7332680 5660929
22
Renewable Energy Generation
Achievement
Oct-2018
1 Electricity Generation (MU) Targets and Achievememts for 2018-19
All India Energy Generation During April 2018- Oct 2018 (MU)
Target (2018-19)April 2018- Oct 2018
Sector
Hydro
Thermal
Nuclear
627957
92955
20689
745071
626968
96003
22035
749173
0
100000
200000
300000
400000
500000
600000
700000
800000
Thermal Hydro Nuclear Total
Programme
Achievement
File NoCEA-CH-14-1142018-Coordination Division
SN Contents Page
1 Energy Power Supply Position (Provisional) for Oct-2018 and during April 2018- Oct 2018 23
2 Peak Power Supply Position (Provisional) for Oct-2018 and during April 2018- Oct 2018 24
3 Energy Power Supply Position (Revised) for Sep-2018 and during April 2018- Sept 2018 25
4 Peak Power Supply Position (Revised) for Sep-2018 and during April 2018- Sept 2018 26
5 Notified Power cuts Restrictions on Industries during Oct-2018 27
6 Power Supply to Agricultural Sector during Oct-2018 28
Section F - Power supply position
File NoCEA-CH-14-1142018-Coordination Division
आकड़ मममलयन यननट नट Figures in MU net
ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied
कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )
चडीगढ़ Chandigarh 108 108 0 00 1055 1055 0 00
दिलली Delhi 2490 2489 1 00 22524 22510 14 01
हरियजणज Haryana 4554 4554 0 00 35205 35205 0 00
दहमजचल परिश Himachal Pradesh 788 787 2 02 5728 5560 168 29
रमम कशमीि Jammu amp Kashmir 1497 1219 278 186 10982 8865 2117 193
परजब Punjab 4418 4418 0 00 38832 38819 13 00
िजरसथजन Rajasthan 6748 6748 0 00 45341 45181 160 04
उतति परिश Uttar Pradesh 10136 9973 164 16 75485 74808 676 09
उततिजखड Uttarakhand 1083 1081 3 03 8395 8310 85 10
उततरी कषतर Northern Region 31822 31375 447 14 243547 240314 3233 13
छततीसगढ़ Chhattisgarh 2454 2453 1 00 16119 16091 28 02
गरिजत Gujarat 11636 11636 0 00 70782 70768 14 00
मधय परिश Madhya Pradesh 5860 5859 1 00 38412 38410 2 00
महजिजषटर Maharashtra 15223 15095 128 08 95489 95355 134 01
िमन औि दिउ Daman amp Diu 216 216 0 00 1523 1523 0 00
िजिि व नगि हवली Dadra amp Nagar Haveli 553 553 0 00 3757 3757 0 00
गोवज Goa 366 366 0 00 2497 2495 2 01
पशचिमी कषतर Western Region 36308 36178 130 04 228579 228398 180 01
आनधर परिश Andhra Pradesh 5860 5854 6 01 37377 37334 43 01
तलगजनज Telangana 6748 6742 6 01 38251 38205 46 01
कनजाटक Karnataka 5842 5835 7 01 39111 39059 52 01
किल Kerala 2116 2096 20 09 14256 14160 96 07
तममल नजड Tamil Nadu 8611 8601 10 01 65742 65666 76 01
पडचिी Puducherry 216 215 1 05 1654 1646 8 05
लकष-दवीप Lakshadweep 4 4 0 0 27 27 0 0
दकषकषणी कषतर Southern Region 29392 29342 50 02 196390 196069 321 02
बबहजि Bihar 2742 2738 4 01 19143 18951 192 10
िजमोिि घजटी ननगम DVC 1712 1698 13 08 13096 12828 268 20
झजिखणड Jharkhand 701 697 4 06 5022 4949 73 15
ओडडशज Odisha 3147 3134 13 04 20224 20192 32 02
पशशचम बगजल West Bengal 4204 4200 4 01 33008 32881 127 04
मसशककम Sikkim 40 40 0 00 279 279 0 01
अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 67 202 188 13 67
परवी कषतर Eastern Region 12547 12507 40 03 90772 90080 692 08
अरणजचल परिश Arunachal Pradesh 67 66 1 09 502 496 7 13
असम Assam 833 809 24 29 6153 5903 250 41
मणणपि Manipur 72 71 1 10 485 478 7 14
मघजलय Meghalaya 147 147 0 00 1043 1042 0 00
ममज़ोिम Mizoram 63 62 1 08 365 359 5 14
नजगजलड Nagaland 76 67 8 110 540 481 59 109
बिपिज Tripura 130 129 1 09 1025 1007 19 18
उततर-परवी कषतर North-Eastern Region 1387 1351 35 25 10113 9766 346 34
समपणण भारत All India 111455 110753 702 06 769399 764627 4773 06
23
ऊराण वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Energy Power Supply Position Report (Provisional)
राजयStateअकरबर2018 October2018 अपरल2018 -अकरबर2018 April2018 to October2018
ऊरजा पनत ा म कमी ऊरजा पनत ा म कमीEnergy not Supplied
Excludes energy exported to Bangladesh
Energy not Supplied
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
File NoCEA-CH-14-1142018-Coordination Division
अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met
कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )
चडीगढ़ Chandigarh 217 217 0 00 369 369 0 00
दिलली Delhi 4713 4713 0 00 7016 7016 0 00
हरियजणज Haryana 7948 7948 0 00 10270 10270 0 00
दहमजचल परिश Himachal Pradesh 1520 1520 0 00 1520 1520 0 00
रमम कशमीि Jammu amp Kashmir 2836 2269 567 200 2951 2361 590 200
परजब Punjab 7979 7979 0 00 12638 12638 0 00
िजरसथजन Rajasthan 11450 11450 0 00 11698 11698 0 00
उतति परिश Uttar Pradesh 17434 16745 688 39 20498 20062 436 21
उततिजखड Uttarakhand 1943 1943 0 00 2143 2143 0 00
उततरी कषतर Northern Region 50659 49635 1024 20 63166 61726 1440 23
छततीसगढ़ Chhattisgarh 4414 4268 146 33 4414 4268 146 33
गरिजत Gujarat 18148 18130 19 01 18148 18130 19 01
मधय परिश Madhya Pradesh 11356 11317 39 03 11356 11317 39 03
महजिजषटर Maharashtra 23864 23159 705 30 23864 23254 610 26
िमन औि दिउ Daman amp Diu 342 341 1 02 357 356 1 02
िजिि व नगि हवली Dadra amp Nagar Haveli 784 780 4 05 816 815 1 01
गोवज Goa 536 536 0 00 596 596 0 00
पशचिमी कषतर Western Region 56548 55695 853 15 56548 55695 853 15
आनधर परिश Andhra Pradesh 9435 9435 0 00 9435 9435 0 00
तलगजनज Telangana 10603 10603 0 00 10815 10815 0 00
कनजाटक Karnataka 10741 10741 0 00 10741 10741 0 00
किल Kerala 3727 3644 83 22 4050 3997 53 13
तममल नजड Tamil Nadu 14747 14333 414 28 15029 14981 47 03
पडचिी Puducherry 363 362 1 03 420 400 19 46
लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0
दकषकषणी कषतर Southern Region 45279 45226 53 01 45946 45684 262 06
बबहजि Bihar 4945 4945 0 00 5050 5045 5 01
िजमोिि घजटी ननगम DVC 2729 2729 0 00 2874 2874 0 00
झजिखणड Jharkhand 1260 1260 0 00 1339 1284 55 41
ओडडशज Odisha 5624 5224 400 71 5624 5357 268 48
पशशचम बगजल West Bengal 8775 8775 0 00 9130 9123 7 01
मसशककम Sikkim 86 86 0 00 90 90 0 00
अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7
परवी कषतर Eastern Region 22959 22567 392 17 22959 22567 392 17
अरणजचल परिश Arunachal Pradesh 138 125 13 94 138 133 5 37
असम Assam 1785 1704 81 45 1865 1809 56 30
मणणपि Manipur 187 185 2 11 193 186 7 36
मघजलय Meghalaya 336 336 0 00 371 368 2 07
ममज़ोिम Mizoram 99 97 2 20 103 98 4 41
नजगजलड Nagaland 134 131 3 22 156 138 18 117
बिपिज Tripura 269 269 0 00 298 293 5 17
उततर-परवी कषतर North-Eastern Region 2790 2700 90 32 2967 2850 117 39
समपणण भारत All India 172945 170604 2341 14 177022 175528 1494 08
24
अधिकतम वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Peak Power Supply Position Report (Provisional)
आकड़ मगज वजट नट Figures in MW netअपरल2018 -अकरबर2018 April2018 to October2018
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
मजग की पनता म कमी Demand not Met
Excludes the supply to Bangladesh
राजयStateअकरबर2018 October2018
मजग की पनता म कमी Demand not Met
File NoCEA-CH-14-1142018-Coordination Division
आकड़ मममलयन यननट नट Figures in MU net
ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied
कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )
चडीगढ़ Chandigarh 141 141 0 00 947 947 0 00
दिलली Delhi 2925 2924 1 00 20034 20021 13 01
हरियजणज Haryana 4794 4794 0 00 30651 30651 0 00
दहमजचल परिश Himachal Pradesh 876 853 24 27 4940 4773 167 34
रमम कशमीि Jammu amp Kashmir 1520 1246 274 180 9485 7646 1839 194
परजब Punjab 5575 5575 0 00 34414 34401 13 00
िजरसथजन Rajasthan 6202 6201 0 00 38594 38434 160 04
उतति परिश Uttar Pradesh 10211 10124 86 08 65349 64836 513 08
उततिजखड Uttarakhand 1162 1149 13 11 7311 7229 82 11
उततरी कषतर Northern Region 33405 33008 398 12 211725 208939 2786 13
छततीसगढ़ Chhattisgarh 2403 2388 15 06 13665 13638 27 02
गरिजत Gujarat 10122 10122 0 00 59146 59132 14 00
मधय परिश Madhya Pradesh 5492 5491 1 00 32552 32551 1 00
महजिजषटर Maharashtra 13615 13612 3 00 80266 80260 6 00
िमन औि दिउ Daman amp Diu 221 221 0 00 1306 1306 0 00
िजिि व नगि हवली Dadra amp Nagar Haveli 551 551 0 00 3204 3204 0 00
गोवज Goa 339 339 0 00 2131 2128 2 01
पशचिमी कषतर Western Region 32742 32723 19 01 192270 192220 50 00
आनधर परिश Andhra Pradesh 5294 5287 7 01 31518 31480 37 01
तलगजनज Telangana 6279 6272 8 01 31503 31463 40 01
कनजाटक Karnataka 5701 5693 8 01 33269 33225 45 01
किल Kerala 2050 2026 24 12 12140 12063 76 06
तममल नजड Tamil Nadu 8971 8959 12 01 57131 57065 66 01
पडचिी Puducherry 226 224 2 08 1438 1431 7 05
लकष-दवीप Lakshadweep 4 4 0 0 23 23 0 0
दकषकषणी कषतर Southern Region 28520 28460 60 02 166998 166727 271 02
बबहजि Bihar 2839 2793 46 16 16400 16213 188 11
िजमोिि घजटी ननगम DVC 1901 1750 151 79 11384 11130 254 22
झजिखणड Jharkhand 740 723 17 22 4321 4252 69 16
ओडडशज Odisha 2921 2918 3 01 17077 17058 19 01
पशशचम बगजल West Bengal 4902 4879 23 05 28804 28681 123 04
मसशककम Sikkim 39 39 0 01 239 239 0 01
अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 67 173 162 12 67
परवी कषतर Eastern Region 13341 13102 240 18 78225 77573 652 08
अरणजचल परिश Arunachal Pradesh 74 73 1 10 435 429 6 14
असम Assam 950 914 36 38 5320 5094 226 43
मणणपि Manipur 70 69 1 11 414 408 6 15
मघजलय Meghalaya 150 150 0 01 896 896 0 01
ममज़ोिम Mizoram 58 57 1 12 302 297 5 16
नजगजलड Nagaland 80 72 8 104 464 414 50 108
बिपिज Tripura 192 191 1 07 895 878 17 19
उततर-परवी कषतर North-Eastern Region 1575 1527 48 31 8726 8415 311 36
समपणण भारत All India 109584 108819 765 07 657944 653873 4071 06
Energy not Supplied Energy not Supplied
ससतबर2018 September2018 अपरल2018 -ससतबर2018 April2018 to September2018
ऊरजा पनत ा म कमी ऊरजा पनत ा म कमी
Excludes energy exported to Bangladesh
राजयState
ऊराण वरवदयत आपरतण शथिरत ररपोरण (सशोधित) Energy Power Supply Position Report (Revised)
25
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
File NoCEA-CH-14-1142018-Coordination Division
अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met
कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )
चडीगढ़ Chandigarh 293 293 0 00 369 369 0 00
दिलली Delhi 5358 5358 0 00 7016 7016 0 00
हरियजणज Haryana 9008 9008 0 00 10270 10270 0 00
दहमजचल परिश Himachal Pradesh 1466 1466 0 00 1479 1479 0 00
रमम कशमीि Jammu amp Kashmir 2951 2361 590 200 2951 2361 590 200
परजब Punjab 11405 11405 0 00 12638 12638 0 00
िजरसथजन Rajasthan 10612 10612 0 00 11698 11698 0 00
उतति परिश Uttar Pradesh 18346 18121 225 12 20498 20062 436 21
उततिजखड Uttarakhand 1996 1996 0 00 2143 2143 0 00
उततरी कषतर Northern Region 56407 55649 758 13 63166 61726 1440 23
छततीसगढ़ Chhattisgarh 4404 4075 328 75 4404 4136 268 61
गरिजत Gujarat 16963 16963 0 00 17053 16963 90 05
मधय परिश Madhya Pradesh 8811 8771 41 05 8811 8775 36 04
महजिजषटर Maharashtra 22455 22349 106 05 23395 23254 141 06
िमन औि दिउ Daman amp Diu 357 356 1 02 357 356 1 02
िजिि व नगि हवली Dadra amp Nagar Haveli 816 815 1 01 816 815 1 01
गोवज Goa 596 596 0 00 596 596 0 00
पशचिमी कषतर Western Region 52933 52895 38 01 53841 52895 945 18
आनधर परिश Andhra Pradesh 9435 9416 19 02 9435 9416 19 02
तलगजनज Telangana 10815 10815 0 00 10815 10815 0 00
कनजाटक Karnataka 10103 10090 13 01 10690 10688 2 00
किल Kerala 3888 3638 251 64 4050 3997 53 13
तममल नजड Tamil Nadu 14556 14553 3 00 15029 14981 47 03
पडचिी Puducherry 390 372 17 45 420 400 19 46
लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0
दकषकषणी कषतर Southern Region 45542 45428 114 02 45946 45684 262 06
बबहजि Bihar 5050 5045 5 01 5050 5045 5 01
िजमोिि घजटी ननगम DVC 2641 2641 0 00 2874 2874 0 00
झजिखणड Jharkhand 1233 1233 0 00 1339 1284 55 41
ओडडशज Odisha 4906 4906 0 00 5357 5357 0 00
पशशचम बगजल West Bengal 8644 8639 5 01 9130 9123 7 01
मसशककम Sikkim 78 78 0 00 90 90 0 00
अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7
परवी कषतर Eastern Region 22110 22100 10 00 22470 22290 180 08
अरणजचल परिश Arunachal Pradesh 132 130 2 15 138 133 5 37
असम Assam 1865 1809 56 30 1865 1809 56 30
मणणपि Manipur 184 182 2 13 193 186 7 36
मघजलय Meghalaya 317 317 0 00 371 368 2 07
ममज़ोिम Mizoram 95 93 2 23 103 98 4 41
नजगजलड Nagaland 142 138 5 32 156 138 18 117
बिपिज Tripura 296 293 3 10 298 293 5 17
उततर-परवी कषतर North-Eastern Region 2921 2850 71 24 2967 2850 117 39
समपणण भारत All India 177022 175528 1494 08 177022 175528 1494 08
26
मजग की पनता म कमी मजग की पनता म कमी Demand not MetDemand not Met
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
Excludes the supply to Bangladesh
अधिकतम वरवदयत आपरतण शथिरत ररपोरण (सशोधित) Peak Power Supply Position Report (Revised)
आकड़ मगज वजट नट Figures in MW net
राजयStateससतबर2018 September2018 अपरल2018 -ससतबर2018 April2018 to September2018
File NoCEA-CH-14-1142018-Coordination Division
अकरबर2018 October2018अपरल2018 -अकरबर2018 April2018 to October2018
उततरी कषतर Northern Region
चडीगढ़ Chandigarh Data not received Data not received
दिलली Delhi
हरियजणज Haryana
दहमजचल परिश Himachal Pradesh
रमम कशमीि Jammu amp Kashmir Data not received Data not received
परजब Punjab
िजरसथजन Rajasthanउतति परिश Uttar Pradesh
उततिजखड Uttarakhand
पशचिमी कषतर Western Region
छततीसगढ़ Chhattisgarh
गरिजत Gujarat
मधय परिश Madhya Pradesh
महजिजषटर Maharashtra
गोवज Goa
दकषकषणी कषतर Southern Region
आनधर परिश Andhra Pradesh
तलगजनज Telangana
कनजाटक Karnataka
किल Kerala
तममल नजड Tamil Nadu
पडचिी Puducherryपरवी कषतर Eastern Region
बबहजि Bihar
झजिखणड Jharkhand
ओडडशज Odisha
पशशचम बगजल West Bengal
N
o No
tified
Cuts
N
o No
tified
Cuts
27
अकरबर 2018 म इडथरीर पर वरवदयत करौती का वरवरवरण Notified Power CutsRestrictions on Industries during October2018
राजय कषतर State Regionऊराणमाग करौती EnergyDemand Cut
No Notified Cuts No Notified Cuts
File NoCEA-CH-14-1142018-Coordination Division
अकरबर2018 October2018अपरल2018 -अकरबर2018 April2018 to October2018
उततरी कषतर Northern Region
चडीगढ़ Chandigarh Data not received Data not received
दिलली Delhi Data not received Data not received
हरियजणज Haryana 940 hrsday 0709 - 0950 hrsday
दहमजचल परिश Himachal Pradesh No cut imposed on agriculture consumers and uninterrupted
power is being supplied to agriculture sector
HPSEBL has only 2 agriculture consumers and uninterrupted
power is being supplied to agriculture sector
रमम कशमीि Jammu amp Kashmir Data not received Data not received
परजब Punjab 0507 hrsday 0349 - 0844 hrsday
िजरसथजन Rajasthan 0630 hrsday 0630 hrsday
उतति परिश Uttar Pradesh 1825 hrsday 1814 - 1858 hrsday
उततिजखड Uttarakhand 2350 hrsday 2128 - 2357 hrsday
पशचिमी कषतर Western Region
छततीसगढ़ Chhattisgarh 18hoursday 18 hrsday
गरिजत Gujarat 805 hrsday 805 hrsday
मधय परिश Madhya Pradesh Three-Phase Supply(Irrigation)-947 hrs day
Three-Phase (Mixed) Supply - 2311 hrs day
Three-Phase Supply(Irrigation)- 0933 - 0947 hrs day Three-
Phase (Mixed) Supply - 2300 - 2320 hrs day
महजिजषटर Maharashtra Three-Phase Supply(Irrigation)- 9 hrs day
Three-Phase (Mixed) Supply - 24 hrs day
Three-Phase Supply(Irrigation)- 9 hrs day
Three-Phase (Mixed) Supply - 24 hrs day
गोवज Goa No restriction No restriction
दकषकषणी कषतर Southern Region
आनधर परिश Andhra Pradesh 07 hrsday 07 hrsday
तलगजनज Telangana 24 hoursday 24 hoursday
कनजाटक Karnataka 6 hrsday 6 hrsday
किल Kerala No Restrictions No Restrictions
तममल नजड Tamil Nadu 9 hrsday (6 hrs during day time and 3 hrs during night time) 9 hrsday (6 hrs during day time and 3 hrs during night time)
पडचिी Puducherry No Restrictions No Restrictions
परवी कषतर Eastern Region
बबहजि Bihar About 18 hrsday About 18 hrsday
झजिखणड Jharkhand About 20 hrsday About 20 hrsday
ओडडशज Odisha 24 hrsday 24 hrsday
पशशचम बगजल West Bengal About 23 hrsday About 23 hrsday
28
अकटबर 2018 कषि कषतर को षिदयत आपरति का षििरण Power Supply to Agricultural Sector during October2018
राजय कषतर State Regionऔसत वरवदयत आपरतण घनरो म Average Hours of Supply
On segregated feeders
File NoCEA-CH-14-1142018-Coordination Division
SNo Contents Page
1 Growth of Installed Capacity since 6th Plan 29
2 Progress of Transmission Sector since 6th Plan 30
3 All India Yearly Coal consumption for Power Generation (Utilities)
4 All India Annual Per Capita Consumption of Electricity since -2006
5 Average cost of power supply amp Average realisation (Paisakwh)
6 Growth of Rural Electrification amp Pump Sets Energisation
7 Status of Hydro Schemes Cleared by the CEA in Oct-2018
Section G - Growth of Power Sector
31
32
File NoCEA-CH-14-1142018-Coordination Division
(In MW)
Coal Gas Diesel Total
End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472
End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634
End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537
End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596
End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921
End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703
End of 12th Plan 19216288 2532938 83763 21832988 6780 4447842 50018 31960630
Up to Oct-2018 19599250 2493722 837629 22176734 6780 4548742 7201281 34604757
Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-17) = 51529 MW
Electricity Generation (MU) Targets and Achievements for 2016-17
Coal Gas Diesel Nuclear Hydro Res Total
1959925 2493722 837629 678000 454874 72012805 22925174
29
1 Growth of Installed Capacity Since 6th Plan
Plan YearThermal
Nuclear Hydro RES (MNRE) Total
Total Installed Capacity 34604757 MW
Coal Gas Diesel Nuclear Hydro Res
File NoCEA-CH-14-1142018-Coordination Division
Progress of Transmission Sector in the Country up to Oct 2018
1 TRANSMISSION LINES (All fig in CKM)
At the end of
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
6th plan 0 0 0 0 0 0 0 0 0 0 0 0 1831 4198 0 6029 1641 44364 0 46005 3472 48562 0 52034
7th plan 0 0 0 0 0 0 0 0 0 0 0 0 13068 6756 0 19824 4560 55071 0 59631 17628 61827 0 79455
8th plan 0 0 0 0 1634 0 0 1634 0 0 0 0 23001 13141 0 36142 6564 73036 0 79600 31199 86177 0 117376
9th plan 0 0 0 0 3234 1504 0 4738 751 409 0 1160 29345 20033 0 49378 8687 88306 0 96993 42017 110252 0 152269
10th plan 0 0 0 0 4368 1504 0 5872 1775 409 0 2184 48708 24730 0 73438 9444 105185 0 114629 64295 131828 0 196123
11th Plan 0 0 0 0 5948 1504 1980 9432 4839 411 0 5250 71023 30191 5605 106819 10140 125010 830 135980 91950 157116 8415 257481
12th Plan 6124 0 0 6124 5948 1504 1980 9432 25465 1177 4598 31240 92482 48240 17065 157787 11014 151276 978 163268 141033 202197 24621 367851
13th Plan (Up
to Mar2018)6124 0 0 6124 5948 1504 1980 9432 28666 1512 4881 35059 98247 54286 19067 171600 11258 156497 1000 168755 150243 213799 26928 390970
13th Plan (Up
to Sep-18)6124 0 0 6124 5948 1504 1980 9432 30952 1512 5059 37523 99683 56069 20662 176414 11318 160958 1000 173276 154025 220043 28701 402769
27150
75050
47900
118050
90650
30
IR addition in 12th Plan (up to
March 2017)
Total IR (up to Oct-18)
IR at the end of 11th Plan
IR at the end of 12th Plan
Envisaged IR Capacity at the end
of 13th Plan
Grand Total
Note - The figure upto the end of 10th plan in for stringing progress including the lines not commissioned Now only commissioned lines are reckoned Accordingly the figure for 10th plan (end) may read as 187555 after adjusting with (-) 10852 Ckm
Inter-regional Power Transfer Capacity
plusmn 800 kV HVDC plusmn 500 kV HVDC 765 kV 400 kV 220 kV
File NoCEA-CH-14-1142018-Coordination Division
2004-05 27800
2005-06 28100
2006-07 30200
2007-08 33000
2008-09 35500
2009-10 36700
2010-11 38700
2011-12 41756
2012-13 45460
2013-14 48940
2014-15 53040
2015-16 54590
2016-17 57430
2017-18 60800
Year
2005-06
2006-07
2007-08
2008-09
2009-10
2010-11
2011-12
2012-13
2013-14
2014-15
2015-16
2016-17
2017-18
2004-05 254 209 7568
2005-06 260 221 7636
2006-07 276 227 7423
2007-08 293 239 7727
2008-09 340 263 8713
2009-10 355 268 8870
2010-11 398 303 11975
2011-12 455 330 13514
2012-13 501 376 14867
2013-14 518 175
2014-15 520
6719
7171
3 All India yearly Coal Consumption for Power Generation (Utilities)
YEARCoal Consumption
Million Tonnes
4 All India Annual per Capita consumption of Electricity Since 2006
Per Capita Consumption ( kWh)
6314
(GrossGen+ Net Import) Mid-year population
5 Average cost of power supply amp average realization ( paiseKWH )
Yearcost of supply
(paiseunit)
Realization(paiseunit)
Including AgricultureOnly
Agriculture
1149
7335
7786
91441
8188
88363
957
1010
1075
1122
File NoCEA-CH-14-1142018-Coordination Division
Source- PFC Reports on the performance of State Power Utilities 31
File NoCEA-CH-14-1142018-Coordination Division
Sl
NoExecuting Agency
Installed
Capacity (MW)Cost (Rs crore)
Date of
Clearance
32
No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification
since 2004-05
65291374575 296361511th Plan
Cumu upto End of 11th Plan
596556 21212860
557439Cummulative up to end of 12th Plan
46708
18423975
499150
2003-042004-05
5743
9769
Cumu upto End of 10th Plan
010407 to 310308
010410 to 310311557976840909
010411 to 310312
412667
86293726
3207
482864
12632
1576036
4451722594
15455554
2314176
397343611750
2093311060316074
65109527813884
6 Growth Of Rural Electrification amp Pumpsets Energisation
Plan Year
9th Plan2002-03
134092626
4111
Pump Sets Energised Villages Electricfied (Nos)
2001-02
284064367244
1218
27801997-981998-991999-002000-01
297594
010408 to 310309010409 to 310310
10th Plan
2005-062006-07
322968331020
Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as
Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received
from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made
available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified
villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is
independent of the earlier published reports
No Hydro Electric Project has been issued concurrenceAppraisal letter by CEA during October 2018
7 Status of Hydro Schemes Cleared by the CEA in Oct-2018
Name of Scheme
File NoCEA-CH-14-1142018-Coordination Division
SN Contents Page
1 Rate of sale of power for the year 2016-17 33-41
RATE OF SALE OF POWER FOR THE YEAR 2016-17
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) NORTHERN REGION
CENTRAL SECTOR
BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 18000 66900 19800
CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 54000 222400 21600
CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 30000 144400 19600
CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 23100 91700 42600
PARBATI - III HPS NHPC LTD HYDRO-HYDRO 52000 68200 54800
DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 28000 95600 30000
CHUTAK NHPC LTD HYDRO-HYDRO 4400 22000 79800
DULHASTI HPS NHPC LTD HYDRO-HYDRO 39000 228000 56400
SALAL HPS NHPC LTD HYDRO-HYDRO 69000 342300 11000
TANAKPUR HPS NHPC LTD HYDRO-HYDRO 9420 43000 29600
URI HPS -I NHPC LTD HYDRO-HYDRO 48000 280300 16000
URI HPS - II NHPC LTD HYDRO-HYDRO 24000 147300 48600
NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 4500 24600 88200
SEWA - II NHPC LTD HYDRO-HYDRO 12000 47100 43400
ANTA CCPP NTPC LTD THERMAL-GASN 41930 67539 32400
AURAIYA CCPP NTPC LTD THERMAL-GASN 66336 53501 39100
BADARPUR TPS NTPC LTD THERMAL-COAL 70500 159153 44800
DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 84000 296170 42300
DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 98000 526686 46300
DADRI CCPP NTPC LTD THERMAL-GASHSD 82978 227469 33000
FARIDABAD CCPP NTPC LTD THERMAL-GASN 43159 115577 30800
RIHAND STPS I NTPC LTD THERMAL-COAL 100000 596766 24500
RIHAND STPS II NTPC LTD THERMAL-COAL 100000 737069 24600
RIHAND STPS III NTPC LTD THERMAL-COAL 100000 706546 30600
SINGRAULI STPS NTPC LTD THERMAL-COAL 200000 1394068 20400
TANDA TPS NTPC LTD THERMAL-COAL 44000 295438 40800
UNCHAHAR TPS I NTPC LTD THERMAL-COAL 42000 256454 39800
UNCHAHAR TPS II NTPC LTD THERMAL-COAL 42000 273577 38900
UNCHAHAR TPS III NTPC LTD THERMAL-COAL 21000 142780 43000
KOLDAM NTPC LTD HYDRO-HYDRO 80000 363260 43600
NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 303575 25841
RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 108000 668677 35374
NJHPS SJVNL HYDRO-HYDRO 150000 699496 23820
RAMPUR HPS SJVNL HYDRO-HYDRO 41202 195982 32260
TEHRI HPP THDC HYDRO-HYDRO 100000 272543 51800
KOTESHWAR HEP THDC HYDRO-HYDRO 40000 106244 53400
IGSTPS JHAJJAR ARAVALI P CPL THERMAL-COAL 150000 510429 49490
NEYVELI BARSINGSAR NEYVELI LIG CORP LTD THERMAL-LIG 25000 127520 38040
STATE SECTOR
PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 21000 14222 48200
PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 21000 19205 48400
PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 25000 102257 42600
PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 25000 62107 41800
DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 60000 312213 41000
RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 120000 35767442200
WYC HYDEL STATION HPGCL HYDRO-HYDRO 6240 20365 24900
GIRI POWER HOUSE HPSEB HYDRO-HYDRO 6000 13958 7600
ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 1695 5467 11900
BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 12000 18528 6700
GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 2250 7462 22500
BASSI POWER HOUSE HPSEB HYDRO-HYDRO 6600 29649 7500
BINWA POWER HOUSE HPSEB HYDRO-HYDRO 600 2749 19300
ANNEXURE-I
RATE OF SALE OF POWER FOR THE YEAR 2016-2017
Page 33
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) GAJ POWER HOUSE HPSEB HYDRO-HYDRO 1050 2914 26700
BANER POWER HOUSE HPSEB HYDRO-HYDRO 1200 2864 16200
HOLI POWER HOUSE HPSEB HYDRO-HYDRO 300 616 22500
THIROT POWER HOUSE HPSEB HYDRO-HYDRO 450 1126 22500
KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 1200 3064 22500
LARJI POWER HOUSE HPSEB HYDRO-HYDRO 12600 53677 23700
NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 250 750 31000
CHABA POWER HOUSE HPSEB HYDRO-HYDRO 175 465 23300
RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 150 101 13400
SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 200 000 22500
KILLAR HPSEB HYDRO-HYDRO 030 050 22500
BHABA AUGUMENP H HPSEB HYDRO-HYDRO 450 1276 22500
BS CHAMBA HPSEB HYDRO-HYDRO 045 099 19500
GUMMA HPSEB HYDRO-HYDRO 300 423 22500
GAS TURBINE POWER STATION IPGCL THERMAL-GAS 27000 67233 39300
PPS-I PPCL THERMAL-GAS 33000 175905 38300
PPS-III PPCL THERMAL-GAS 137120 196879 36100
LOWER JHELUM JampKPDD HYDRO-HYDRO 10500 60214 5100
UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 2260 10514 6300
UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 10500 44202 8500
GANDHARBAL JampKPDD HYDRO-HYDRO 1500 8925 4700
KARNAH MPH JampKPDD HYDRO-HYDRO 200 1122 31000
CHENANI I JampKPDD HYDRO-HYDRO 2330 10892 6600
CHENANI II JampKPDD HYDRO-HYDRO 200 1188 9300
CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 750 3634 14200
IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 375 2108 18500
IGO MERCHELLONG JampKPDD HYDRO-HYDRO 300 1572 29700
PAHALGAM MHP JampKPDD HYDRO-HYDRO 450 1713 32900
MARPACHOO JampKPDD HYDRO-HYDRO 075 375 29800
HAFTAL JampKPDD HYDRO-HYDRO 100 483 28700
SANJAK JampKPDD HYDRO-HYDRO 126 441 36000
SEWA-III JampKPDD HYDRO-HYDRO 900 3273 20200
BHADERWAH JampKPDD HYDRO-HYDRO 150 935 8900
BAZGO JampKPDD HYDRO-HYDRO 030 108 33300
SUMOOR JampKPDD HYDRO-HYDRO 010 045 35400
HUNDER JampKPDD HYDRO-HYDRO 040 176 26200
STAKNA JampKPDD HYDRO-HYDRO 400 1933 4100
KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 124000 662879 31360
SURATGARH TPS RRVUNL THERMAL-COAL 150000 402328 41730
CHHABRA TPS 1amp 2 RRVUNL THERMAL-COAL 50000 305946 36700
CHHABRA TPS 3 RRVUNL THERMAL-COAL 25000 151536 36700
CHHABRA TPS 4 RRVUNL THERMAL-COAL 25000 155896 36700
RAMGARH GT POWER PROJECT RRVUNL THERMAL-COAL 22050 43177 41800
RAMGARH GAS T P PROJECT 3 RRVUNL THERMAL-GAS 5000 93615 41800
DHOLPUR C C POWER PROJECT RRVUNL THERMAL-R-LNG 33000 9486 46110
MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 14000 20855 34192
MINI MICRO HYDEL (MMH) P S RRVUNL HYDRO-HYDRO 2385 851 37800
KALISINDH TPP 1 RRVUNL THERMAL-COAL 60000 341543 45000
KALISINDH TPP 2 RRVUNL THERMAL-COAL 60000 211588 45000
KHARA HEP UPJVNL HYDRO-HYDRO 7200 26654 7200
MATATILLA HEP UPJVNL HYDRO-HYDRO 3060 12219 6500
OBRA HEP UPJVNL HYDRO-HYDRO 9900 21517 6300
RIHAND UPJVNL HYDRO-HYDRO 30000 57369 5500
ANPARA A TPS UPRVUNL THERMAL-COAL 63000 317536 27000
ANPARA B TPS UPRVUNL THERMAL-COAL 100000 705605 22700
ANPARA D UPRVUNL THERMAL-COAL 100000 300158 39800
HARDUAGANJ TPS UPRVUNL THERMAL-COAL 16500 45817 49200
HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 50000 304389 46600
OBRA A TPS UPRVUNL THERMAL-COAL 28800 13158 34000
OBRA B TPS UPRVUNL THERMAL-COAL 100000 328124 21900
Page 34
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) PANKI TPS UPRVUNL THERMAL-COAL 21000 66488 50300
PARICHHA TPS UPRVUNL THERMAL-COAL 22000 38762 49400
PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 42000 231931 45600
PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 50000 276722 50400
CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 24000 70845 8290
CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 14400 75366 8390
DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 3375 9595 12080
DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 5100 18701 10520
KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4140 17359 12330
KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 12000 33001 9420
KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 3000 11953 8320
TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 9000 33983 12460
MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 30400 124510 16110
RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 19800 17897 10550
MPUR UTTARAKHAND JVNL HYDRO-HYDRO 930 5121 19200
PATHRI UTTARAKHAND JVNL HYDRO-HYDRO 2040 11636 14200
GALOGI UTTARAKHAND JVNL HYDRO-HYDRO 300 648 12500
PRIVATE SECTOR
MGTPP CLP INDIA PVT LTD THERMAL-COAL 132000 268902 41940
SHRINAGAR HEP ALAKNANDA HPCL HYDRO-HYDRO 33000 127414 48800
GAMA INFRAPROP CCPP GAMA INFRAPROP PVT THERMAL-GAS 22500 52686 47000
PPGCL (BARA) JP POWER VENTURES LTD THERMAL-COAL 198000 448200 38500
MALANA HEP MALANA PCL HYDRO-HYDRO 8600 26354 29792
MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 10000 30369 32580
ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 19200 56347 36079
KASHANG HEP H P PCL HYDRO-HYDRO 19500 5034 29200
BASPA-II HEP HBPCL HYDRO-HYDRO 30000 132769 13600
KARCHAM WANGTOO HEP HBPCL HYDRO-HYDRO 100000 434386 36600
RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 108000 582600 43700
RITHALA COMBI CY POWER PLANT TATA POWER DDL THERMAL-GAS 9480 000 11900
RAJPURA TPS NABHA POWER LTD THERMAL-GAS 140000 901484 39000
TALWANDI SABO POWER LTD TALWANDI SABO POWER LTD THERMAL-COAL 198000 636040 49548
ROJA THERMAL POWER STATION ROJA POWER SCL THERMAL-COAL 120000 727200 43400
KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 34400 63400
BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 36000 62600
MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 38200 60800
UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 37900 61500
KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 42300 58800
LALITPUR PGCL BAJAJ ENERGY PVT LTD THERMAL-COAL 198000 359400 47300
PRAYAGRAJ PGCL PRAYAGRAJ PGCL THERMAL-COAL 132000 448200 38595
KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 132000 783182 33438
WESTERN REGION
CENTRAL SECTOR
INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 100000 325333 23892
OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 52000 141663 34001
GANDHAR CCPP NTPC LTD THERMAL-GAS 65739 221924 28700
KAWAS CCPP NTPC LTD THERMAL-GASN 65620 167929 27000
KORBA I amp II NTPC LTD THERMAL-COAL 210000 1499171 20500
KORBA III NTPC LTD THERMAL-COAL 50000 358746 26600
SIPAT STPS I NTPC LTD THERMAL-COAL 198000 1479902 26800
SIPAT STPS II NTPC LTD THERMAL-COAL 100000 766549 26500
VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 126000 693142 25800
VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 100000 608781 23800
VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 100000 673475 27600
VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 100000 655924 32900
VINDHYACHAL STPS V NTPC LTD THERMAL-COAL 50000 328265 31700
MOUDA I NTPC LTD THERMAL-COAL 100000 343130 44500
MOUDA Ii NTPC LTD THERMAL-COAL 66000 40637 39900
RATNAGIRI GAS amp POWER PVT LTD RGPPL THERMAL-GAS 196708 442485 47000
KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 000 24729
TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 32000 201227 10740
Page 35
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 365122 19069
TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 787444 29324
STATE SECTOR
GSEG-HAZIRA15610 MW GUJARAT S ENEGEN LTD THERMAL-GAS 15610 1805 28200
GSEG-HAZIRA35143 MW GUJARAT S ENEGEN LTD THERMAL-GAS 35130 22276 51300
GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 21978 51800
AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 13929 26100
KORBA TPS EAST CSPGCL THERMAL-COAL 44000 198673 33880
DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 365808 27570
KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 316500 30420
HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 532878 19410
CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 515 58300
MTTPS CHAMPA U-I CSPGCL THERMAL-COAL 50000 220376 39000
MTTPS CHAMPA U-II CSPGCL THERMAL-COAL 50000 23709 10000
SHP GANGREL CSPGCL HYDRO-HYDRO 1000 2350 36790
BANGO HEP CSPGCL HYDRO-HYDRO 12000 14662 8900
MHP KORBA WEST CSPGCL HYDRO-HYDRO 170 859 38190
SIKASAR HEP CSPGCL HYDRO-HYDRO 700 418 26870
DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8843 74500
DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 19446 51500
GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 66388 71600
GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127488 41300
KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 96072 43900
KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 29841 56400
SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 184966 58800
UKAI 1-5 GSECL THERMAL-COAL 85000 204891 46900
UKAI TPS 6 GSECL THERMAL-COAL 50000 284448 48200
WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 271999 58300
WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 82808 44100
KADANA HPS GSECL HYDRO-HYDRO 24200 34433 16800
UKAI HPS GSECL HYDRO-HYDRO 30500 40585 6100
TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 123000 11500
BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 8900 10900
BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 7200 27500
JHINNA HPS MPPGCL HYDRO-HYDRO 2000 9700 18500
RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 44300 3400
GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 17300 4600
SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 4100 16900
MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 14600 27000
PENCH HPS MPPGCL HYDRO-HYDRO 16000 23700 8100
RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 3000 16900
AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 134400 35100
SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 283800 38700
SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 344600 34300
SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 111600 61600
SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 211800 58000
SSTPS PH-I MPPGCL THERMAL-COAL 120000 233100 84300
BHUSAWAL TPS MSPGCL THERMAL-COAL 142000 566258 51100
CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1365682 33700
KHAPERKHEDA MSPGCL THERMAL-COAL 134000 706207 39100
KORADI TPS MSPGCL THERMAL-COAL 62000 443206 42000
NASIK TPS MSPGCL THERMAL-COAL 63000 297275 47000
PARLI TPS MSPGCL THERMAL-COAL 113000 175934 71600
PARAS MSPGCL THERMAL-COAL 50000 267931 38700
URAN CCPP MSPGCL THERMAL-GAS 67200 320330 30600
KOYANA MSPGCL HYDRO-HYDRO 195600 328155 13100
SMALL HYDRO POWER PLANTS MSPGCL HYDRO-HYDRO 45400 93062 30500
BHIRA MSPGCL HYDRO-HYDRO 8000 10046 8400
TILLARI MSPGCL HYDRO-HYDRO 8900 10584 3100
SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 233298 20500
SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 87633 20500
PRIVATE SECTOR
Page 36
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 81282 46750
JNSTPP(JAYPEE NIGRIE) JP POWER VENTURES LTD THERMAL-COAL 132000 726695 29310
MB POWER MB POWER THERMAL-COAL 120000 345632 38310
ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 754922 28671
ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 780761 23495
ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 198000 1263784 32090
ADANI POWER MAHARA ADANI POWER LTD THERMAL-COAL 330000 1666191 34124
AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 170065 36827
SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 252035 45129
ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 458551 36000
ESSAR POWER MP LTD ESSAR POWER MP LTD THERMAL-COAL 60000 243040 28600
VEDANTA LTD (P P -I) VEDANTA LTD THERMAL-GAS 3000 15044 24000
VEDANTA LTD (P P -II) VEDANTA LTD THERMAL-GAS 3000 21293 24000
PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 8234600 24000
165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 5850 64390
145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 68717 40349
SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 132655 28776
SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 144686 38567
MUNDRA UMPPCOASTAL GUJARAT POWER
LTD THERMAL-IMP COAL 400000 2530300
23900
LANCO AMARKANTAK TPP PATHADIH
U-ILANCO AMARKAN POWER LTD THERMAL-COAL 30000 195500
29200
LANCO AMARKANTAK TPP PATHADIH
U-IILANCO AMARKAN POWER LTD THERMAL-COAL 30000 206900
27600
BARADARHA TPS D B POWER LTD THERMAL-COAL 120000 677373 29200
JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 405000 28900
JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 453000 40500
DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 339437 40700
TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 293400 44000
TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 137200 37000
TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 174900 44000
BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 92900 14100
BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23700 34300
KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 27600 48300
CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2530300 23900
BHANDARDRA HEP -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 2475 54900
SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 161400 26500
SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 445000 39000
SOTHERN REGION
CENTRAL SECTOR
NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 325699 54820
NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 305532 39880
NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 998805 38510
NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 113016 54070
NEYVELI TAMILNADU POWER LTD JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 625274 42200
VALLUR TPS NTPC TECL THERMAL-COAL 150000 856438 42350
R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 1493 84300
RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1502919 29400
RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 341291 31800
SIMHADRI I NTPC LTD THERMAL-COAL 100000 688382 36800
SIMHADRI II NTPC LTD THERMAL-COAL 100000 663657 43400
KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 593110 31324
MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 291625 21764
KKNPP-1 amp 2 NPCIL NUCLEAR-NUCLEAR 200000 572609 40948
MINICOY LAKSHADEEP THERMAL-DIESEL 340 770 29600
KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1097 29600
AMINI LAKSHADEEP THERMAL-DIESEL 265 509 29600
ANDROTT LAKSHADEEP THERMAL-DIESEL 219 524 29600
KALPENI LAKSHADEEP THERMAL-DIESEL 175 356 29600
AGATTI LAKSHADEEP THERMAL-DIESEL 195 658 29600
KADMAT LAKSHADEEP THERMAL-DIESEL 190 414 29600
KILTAN LAKSHADEEP THERMAL-DIESEL 150 269 29600
CHETLET LAKSHADEEP THERMAL-DIESEL 100 139 29600
BITRA LAKSHADEEP THERMAL-DIESEL 043 024 29600
BANGARAM LAKSHADEEP THERMAL-DIESEL 018 009 29600
Page 37
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) STATE SECTOR
Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 721811 46500
Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 50000 336142 46500
RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 237358 46500
RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 239926 46500
RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 124500 46500
SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 62109 46500
UPPER SILERU APGENCO HYDRO-HYDRO 24000 33000 46500
LOWER SILERU APGENCO HYDRO-HYDRO 46000 81066 46500
DONKARAI APGENCO HYDRO-HYDRO 2500 6007 46500
PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 1262 46500
CHETTIPETA APGENCO HYDRO-HYDRO 100 214 46500
MUCHKUND APGENCO HYDRO-HYDRO 12000 37571 46500
NAGARJUNASAGAR RCPH APGENCO HYDRO-HYDRO 9000 606 46500
TUNGABHADRA HES amp HAMPI(AP
Share)
APGENCO HYDRO-HYDRO 7200 6100 46500
KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 352232 42600
KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 288131 32500
KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 319272 46500
RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 40073 44300
KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 308317 46000
KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 308963 51300
SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 61004 76600
NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 17960 75300
PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 20873 58300
POCHAMPAD-I TSPGENCO HYDRO-HYDRO 2700 5455 29800
POCHAMPAD-II TSPGENCO HYDRO-HYDRO 900 1932 40700
NIZAMSAGAR TSPGENCO HYDRO-HYDRO 1000 1126 53400
RAICHUR TPS 1 to 7 KPCL THERMAL-COAL 147000 890866 43800
RAICHUR TPS 8 KPCL THERMAL-COAL 25000 159523 48200
BELLARI TPS 1 KPCL THERMAL-COAL 50000 318679 51100
BELLARI TPS 2 KPCL THERMAL-COAL 50000 232347 55600
BELLARI TPS 3 KPCL THERMAL-COAL 70000 47565 34400
BHADRA PH KPCL HYDRO-HYDRO 3920 2369 45900
GERUSUPPA PH KPCL HYDRO-HYDRO 24000 26990 22000
GHAT PRABHA HEP KPCL HYDRO-HYDRO 3200 4777 25300
KADRA HPS KPCL HYDRO-HYDRO 15000 16889 26800
NAGJHARI KPCL HYDRO-HYDRO 90000 155159 9800
KODASALLI DPH KPCL HYDRO-HYDRO 12000 14854 19200
MUNIRA+MGH+SPH+SPH KPCL HYDRO-HYDRO 22640 48211 7900
SHARAVATHY HPS KPCL HYDRO-HYDRO 108550 276215 5400
ALMATTI DPH KPCL HYDRO-HYDRO 29000 39611 24600
VARAHI UGPH KPCL HYDRO-HYDRO 46000 71368 15600
IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 17196 15300
IDUKKI HPS KSEB HYDRO-HYDRO 78000 137905 15300
KAKKAD HPS KSEB HYDRO-HYDRO 5000 13063 15300
KALLADA HPS KSEB HYDRO-HYDRO 1500 4436 15300
KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 46544 15300
KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 635 15300
LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 30822 15300
MALANKARA HPS KSEB HYDRO-HYDRO 1050 2474 15300
MATTUPETTY KSEB HYDRO-HYDRO 200 230 15300
MALAMPUZHA KSEB HYDRO-HYDRO 250 063 15300
CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 864 15300
URUMI ST I amp II KSEB HYDRO-HYDRO 615 903 15300
LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 248 15300
NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7765 19625 15300
PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 16601 15300
PANNIAR HPS KSEB HYDRO-HYDRO 3240 6217 15300
PORINGALKUTHU KSEB HYDRO-HYDRO 3600 10052 15300
PORINGALKUTHU LBE KSEB HYDRO-HYDRO 1600 9438 15300
PEPPARA KSEB HYDRO-HYDRO 300 395 15300
POOZHITHODE KSEB HYDRO-HYDRO 480 1045 15300
Page 38
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) PEECHI KSEB HYDRO-HYDRO 125 040 15300
RANI-PERUNADU KSEB HYDRO-HYDRO 400 585 15300
SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 79783 15300
SENGULAM HPS KSEB HYDRO-HYDRO 5120 11558 15300
SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 16711 15300
VILANGAD KSEB HYDRO-HYDRO 750 1578 15300
BARAPOLE KSEB HYDRO-HYDRO 1500 1932 15300
VELLATHOOVAL KSEB HYDRO-HYDRO 360 305 15300
CHIM0NY KSEB HYDRO-HYDRO 250 156 15300
ADYANPARA KSEB HYDRO-HYDRO 350 501 15300
BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 554 15300
KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 3801 15300
KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 23132 32800
ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 14416 62280
METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 523970 62280
METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 321270 62280
NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 336575 62280
NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 591240 62280
TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 508966 62280
KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 30897 62280
VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 18720 90699 62280
KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 33593 62280
BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 1047 62280
PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 1250 62280
PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 330 62280
MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 4897 62280
MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 032 62280
KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15681 62280
KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 40608 62280
KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 21342 62280
KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 4717 62280
KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4322 62280
KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2399 62280
METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 4416 62280
METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 8035 62280
BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2187 62280
BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2359 62280
BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2511 62280
BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 1949 62280
BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 1819 62280
POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 172 62280
SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 241 62280
MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 026 62280
THIRUMOORTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 136 62280
PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 9309 62280
VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 353 62280
SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 4192 62280
PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 6571 62280
SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 1186 62280
SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6319 62280
ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 6122 62280
KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 28674 62280
SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 18381 62280
SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 4258 62280
KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 12680 62280
KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4201 62280
ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 000 62280
PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 19175 62280
AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 078 62280
BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 504 62280
BHAVANI KATTALAI (BKB)(IIIampIII BB I amp II)TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 5847 62280
PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 000 62280
Page 39
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) SRI DAMODARAM STPS APPDCL THERMAL-COAL 160000 808108 36300
PRIVATE SECTOR
KARUPPUR TANJORE LANCO TANJORE PCL THERMAL-GAS 12000 48096 28770
SIMHAPURI ENERGY LTD SIMHAPURI ENERGY LTD THERMAL-COAL 60000 143900 39100
JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 7111 45500
SBU 1 JSW ENERGY LTD
VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 26000 159100
43300
SBU 2 JSW ENERGY LTD
VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 60000 247900
42800
LANCO KPLLANCO KONDAPALLI POWER
LTDTHERMAL-GAS 36814 85060
25776
LANCO KPL STG -IILANCO KONDAPALLI POWER
LTDTHERMAL-GAS 36600 12979
46330
LANCO KPL STG -IIIALANCO KONDAPALLI POWER
LTDTHERMAL-GAS 37100 85710
46330
LANCO KPL STG -III BLANCO KONDAPALLI POWER
LTDTHERMAL-GAS 37100 43639
46330
HINDUJA NATIONAL PCL HINDUJA NATIONAL PCL THERMAL-COAL 104000 303000 38200
MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 121164 49940
UDUPI POWER COR LTD ADANI POWER LTD THERMAL-COAL 120000 754613 42500
SPECTRUM POWER GENERATION
LTD SPECTRUM PG LTD THERMAL-GASN 20525 9256812
34952
TAQA NEYVELI POWER COM PVT
LTD TAQA NEYVELI THERMAL-LIG 25000 5840
34500
ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 251000 51000
ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 207860 36800
GMR VEMAGIRI POWER GENERATION
LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 30117
46450
EASTERN REGION
CENTRAL SECTOR
MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 64675 53113
MTPS STAGE - II KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 39000 1432 69138
BOKARO `B` TPS DVC THERMAL-COAL 63000 145670 31539
MEJIA TPS U 1-3 DVC THERMAL-COAL 63000 348298 31552
MEJIA TPS U 4 DVC THERMAL-COAL 21000 116099 34997
MEJIA TPS U 5-6 DVC THERMAL-COAL 50000 276427 35976
MEJIA TPS U 7-8 DVC THERMAL-COAL 100000 552854 36991
DURGAPUR STEEL TPS DVC THERMAL-COAL 100000 665550 39323
DURGAPUR TPS DVC THERMAL-COAL 21000 59270 35416
RAGHUNATHPUR TPS DVC THERMAL-COAL 120000 201650 35326
MAITHON HYDEL STA DVC HYDRO-HYDRO 6320 12200 17984
CHANDRAPURA TPSU1-3 DVC THERMAL-COAL 42000 257610 35095
CHANDRAPURA TPSU7-8 DVC THERMAL-COAL 50000 306673 34987
KODERMA TPS DVC THERMAL-COAL 100000 380180 38131
PANCHET HPS DVC HYDRO-HYDRO 8000 13360 17984
TILLAYA HPS DVC HYDRO-HYDRO 400 1410 17984
RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34700 35400
TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 277300 23200
TLDP -III NHPC LTD HYDRO-HYDRO 13200 55400 62000
TLDP -IV NHPC LTD HYDRO-HYDRO 16000 60300 25600
FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 957219 33700
FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 308943 41000
BONGAINGAON TPS NTPC LTD THERMAL-COAL 25000 153663 58600
KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 542277 34200
KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 942591 34200
BARH-II NTPC LTD THERMAL-COAL 132000 728021 44500
TALCHER TPS NTPC LTD THERMAL-COAL 46000 335521 30100
TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 702319 25600
TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1436521 24700
STATE SECTOR
BTPS(RampM) BIHAR STATE PGCL THERMAL-COAL 22000 12142 39700
BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 98331 10602
HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 50593 9482
CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 19689 2605
RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 53192 6033
UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 147208 14637
Page 40
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 60353 4519
IB TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 288567 25000
J P H GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 210 038 61100
MEYONG CHU GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 400 1086 61100
TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 122667 38200
DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 214339 43321
KOLAGHAT THERMAL POWER
STATION
WEST BENGAL PDCL THERMAL-COAL 126000 538269 31603
BAKRESHWAR THERMAL POWER
PLANT
WEST BENGAL PDCL THERMAL-COAL 105000 634876 32154
BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 45000 166855 33299
SANTHALDIH THERMAL POWER
STATION
WEST BENGAL PDCL THERMAL-COAL 50000 336442 34932
SAGARDIGHI THERMAL POWER
PROJECT
WEST BENGAL PDCL THERMAL-COAL 160000 423121 34705
JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 20344 68900
RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 24559 68900
TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 4623 68900
PURULIA PUMPED STORAGE
PROJECT
WEST BENGAL SEDCL HYDRO-HYDRO 90000 108816 68900
MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2768 68900
PRIVATE SECTOR
CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 49474 20230
CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 555500 70200
HALDIA ENERGY HALDIA ENERGY LTD THERMAL-COAL 60000 371000 50400
DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3688 63400
KAMALANGA TPS GMR KAMALANGA ENERGY LTD THERMAL-COAL 105000547670
33300
ADHUNIK POWER U-1 ADHUNIK POWER THERMAL-COAL 27000 158 44060
ADHUNIK POWER U-2 ADHUNIK POWER THERMAL-COAL 27000 168 44250
VL-JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 332800 23622
JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 43000 45250
JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 71700 37030
JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 70700 35920
JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 71100 38870
JOJOBERA UNIT 5 TATA POWER COM LTD THERMAL-COAL 12000 79300 44560
JOJOBERA UNIT 6 TATA POWER COM LTD THERMAL-WHR 12000 83700 12840
IEL KALINGANAGAR U-I TATA POWER COM LTD THERMAL-WG 6750 33400 22500
IEL KALINGANAGAR U-II TATA POWER COM LTD THERMAL-WG 6750 34800 22500
MAITHON UNIT 1 amp 2 TATA POWER COM LTD THERMAL-COAL 105000 678000 36100
HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 27500 24340
HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 28400 24340
HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 15800 24310
NORTH EASTERN REGION
CENTRAL SECTOR
LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 74100 36600
AGARTALA GT NEEPCO THERMAL-GAS 13500 88611 27210
ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 153111 32310
DOYANG HEP NEEPCO HYDRO-HYDRO 7500 25598 49801
KOPILI HEP NEEPCO HYDRO-HYDRO 20000 98186 11491
KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 19582 20237
KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 10310 17968
RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 124093 22945
TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 10100 17344 39000
STATE SECTOR
HYDRO POWER (122 Stns) ITANAGAR GOVT OF ARUNACHAL
PRADESHHYDRO-HYDRO 6971 6217270
24600
KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39514 17337
LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 82327 36810
NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 33318 48290
MYNTRIANG SHEP ST II ASSAM POWER GENCO HYDRO-HYDRO 300 567 35776
LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 9130 49200
LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 012 49200
DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 022 49200
TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 000 49200
UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 4990 16000
UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 6476 37000
UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 16494 14600
UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 3600 9556 15000
SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 758 8000
MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44070 44800
KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 154 41400
TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 091 41400
MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 411 41400
MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 394 41400
KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 760 41400
SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 3264 41400
LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 044 41400
BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 18953 28000
ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 43585 28200
GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 4080 11100
Note
LIG Lignite N Naptha WHR Waste Heat Recovery
Page 41
File NoCEA-CH-14-1142018-Coordination Division
Voltage Level
+- 500 KV HVDC
+- 800 KV HVDC
765 KV
400 KV
220 KV
All India
Voltage Level
+- 500 KV HVDC
+- 800 KV HVDC
765 KV
400 kV
220 KV
All India
5
0 0
6 Transmission Lines Added during Oct-2018 (Ckms)
Oct-17 Oct-18
0 0
0 0
0 729
245 737
324 401
569 1867
Transmission Lines Added duringApril 2017- Oct 2017 ampApril 2018- Oct 2018 (Ckms)
April 2017- Oct 2017 April 2018- Oct 2018
2151 4521
13120 11799
0 0
2046 2464
8923 4814
569
1867
0
500
1000
1500
2000
All India
Ckm
s
Oct-17 Oct-18
13120
11799
11000
11500
12000
12500
13000
13500
All India
Ckm
s
April 2017- Oct 2017 April 2018- Oct 2018
File NoCEA-CH-14-1142018-Coordination Division
Voltage Level
+- 800 KV HVDC
+- 500 KV HVDC
765 KV
400 KV
220 KV
All India
Voltage Level
+- 800 KV HVDC
+- 500 KV HVDC
765 KV
400 KV
220 KV
All India
6
7 Transformation Capacity Addition During Oct-2018 (MVA)
0
0
2575
1025
0 0
Oct-17 Oct-18
3600
0
3000
9840
4620
2220
3000 0
All India Transformation Capacity Addition during April 2017- Oct 2017 amp April
2018- Oct 2018 (MVA)
41790
0
14000
17180
10610
45665
10000
23020
9645
0
April 2017- Oct 2017 April 2018- Oct 2018
3600
9840
0
2000
4000
6000
8000
10000
12000
MV
A
Oct-17 Oct-18
4566541790
0
74520
1
MV
A
April 2017- Oct 2017 April 2018- Oct 2018
File NoCEA-CH-14-1142018-Coordination Division
Oct-2017 Oct-2018 Oct-2017 Oct-2018 Oct-2017 Oct-2018
Northern 31786 31822 31096 31375 -22 -14
Western 31728 36308 31628 36178 -03 -04
Southern 24314 29392 24271 29342 -02 -02
Eastern 12012 12547 11931 12507 -07 -03
North Eastern 1487 1387 1451 1351 -24 -25
All India 101327 111455 100377 110753 -09 -06
Oct-2017 Oct-2018 Oct-2017 Oct-2018 Oct-2017 Oct-2018
Northern 51307 50659 50289 49635 -20 -20
Western 48530 56548 46392 55695 -44 -15
Southern 39142 45279 38905 45226 -06 -01
Eastern 19850 22959 19836 22567 -01 -17
North Eastern 2596 2790 2499 2700 -37 -32
All India 162027 172945 157394 170604 -29 -14
Oct-2018 Figures are Provisional
7
8 Power Supply Position (Energy amp Peak) in Oct-2018
Peak Demand Peak Met
Requirement Availability
Energy (MU)Region
Surplus(+)
Deficit (-) in
Surplus(+)
Deficit (-) in Region
Power (MW)
File NoCEA-CH-14-1142018-Coordination Division
Chandigarh Delhi Haryana HP JampK Punjab Rajasthan UP Utrakhand Oct-2017 0 0 0 0 516 0 0 0 0
Oct-2018 0 0 0 0 567 0 0 688 0
Chattisgarh Gujarat MP Maharastra Daman amp Diu Dadar Nagar Goa
Oct-2017 16 0 13 2062 0 0 25
Oct-2018 146 19 39 705 1 4 0
AP Telangana Karnataka Kerala Tamil Nadu Puducherry Lakshadweep
Oct-2017 18 19 0 211 38 2 0
Oct-2018 0 0 0 83 414 1 0
8
9 Peak Shortage of Power Supply (MW) in Different Regions in Oct-2018
0 0 0 0
567
0 0
688
00 0 0 0
516
0 0 0 0
0
400
800
Chan
dig
ar
h
Delh
i
Hary
ana
HP
Jamp
K
Pu
nj
ab
Raja
sth
an
UP
Utr
ak
hand
MW
Northern States (MW) Oct-2018 Oct-2017
146
19
39 705
1 4 016
0 13
2062
0 0 25
0
5000
Ch
attis
garh
Guja
rat
MP
Mah
ara
st
ra
Da
man amp
Diu
Da
dar
Na
gar G
oaM
W
Western States (MW) Oct-2018 Oct-2017
0 0 083
414
1 018 19 0
211
38 2 00
500
AP Telangana Karnataka Kerala Tamil Nadu Puducherry Lakshadweep
Southern State (MW) Oct-2018 Oct-2017
File NoCEA-CH-14-1142018-Coordination Division
Bihar DVC Jharkhand Odisha West Bengal Sikkim AampN Island
Oct-2017 6 0 0 0 8 0 4
Oct-2018 0 0 0 400 0 0 4
Arunachal Assam Manipur Meghalaya Mizoram Nagaland Tripura
Oct-2017 6 77 4 0 2 2 12
Oct-2018 13 81 2 0 2 3 0
9
0 0 0
400
0 0 46 0 0 0 8 0 4
0100200300400500
Bih
ar
DV
C
Jha
rkh
an
d
Od
ish
a
We
st
Be
ng
al
Sik
kim
Aamp
NIs
land
MW
Eastern States (MW) Oct-2018 Oct-2017
13
81
2 0 2 3 06 4 0 2 2
12
0
100
Aru
na
ch
al
Assa
m
Ma
nip
ur
Meghal
aya
Miz
ora
m
Na
gala
nd
Trip
ura
MW
North-Eastern States (MW)
File NoCEA-CH-14-1142018-Coordination Division
Sector Oct-2017 Oct-2018
Central 6872 7355
State 5217 6078
Private 6045 6819
ALL INDIA 5882 6524
Month PLF 2017 PLF 2018
Jan 6014 6288
Feb 6153 6285
March 6313 6558
April 6493 6458
May 6355 6554
June 5672 5917
July 537 5545
Aug 5733 5639
Sep 5989 6109
Oct 5882 6524
For Coal and Lignite based Power Plants and Provisional based on Actual-Cum-Assesment
10
PLF of Thermal Power Plants
All India PLF of Thermal Plants (Excluding Gas Based Plants) Month-wise
10 All India PLF Sector-wise for Oct-2018
68
72
52
17
60
45
58
8273
55
60
78
68
19
65
24
000
1000
2000
3000
4000
5000
6000
7000
8000
Central State Private ALL INDIA
P
LF
Oct-2017 Oct-2018
0
10
20
30
40
50
60
70
Jan Feb March April May June July Aug Sep Oct
Months
All India PLF Month-wise
PLF 2017 PLF 2018
File NoCEA-CH-14-1142018-Coordination Division
2012-13 2013-14 2014-15 2015-16 2016-17
TampD Losses 2304 2284 2277 2181 2142
ATampC Losses 2548 2258 2462
Note As per PFC for utilities selling directly to consumers
Total Number of Villages
597464
Note From the year 2004-05 onwards Definition of Village Electrification-
A village would be declared Electrified if
Without
Subsidy
Gap ACS-
ARR(
Without
Subsidy)
Paiseunit
Gap ACS-
ARR (on
subsidy
booked
basis)
paiseunit
Gap ACS-
ARR (on
subsidyrece
ived basis)
paiseunit
2013-14 400 118 76 77
2014-15 412 108 58 60
Source- PFC Reports on the performance of State Power Utilities
2013-14 4894
2014-15 5304
2015-16 5459
2016-17 5743
2017-18 6080
11
Average cost of supply(ACS)
(paiseunit)
i) Basic Infrastructure such as Distribution Transformer and Distribution lines are provided in the inhabited locality
as well as Dalit Basti hemlet where it exists (For electrification through Non-Conventional Energy Sources a
Distribution Transformer may not be necessary)
14 All India Coal consumption for Power Generation (MT)
520
Average Revenue Realization(paiseunit)
518
Year
ii) Electricity is provided to Public places like Schools Panchayat Office Health Centre Dispensaries Community
Centres etc and
iv) Mandatory Certification from Gram Panchayat regarding the completion of village electrification should be
obtained
13 Average cost of Power amp Average Realisation
iii) The number of households electrified should be at least 10 of the total number of households in the village
11 T amp D and ATampC Losses ()
12 All India Village Electrification
Villiages Electrified (Nos)
10000All villages as per census 2011 has
been electrified on 28042018
Villages electrified
File NoCEA-CH-14-1142018-Coordination Division
SN Contents Page
1 Capacity Addition Targets and Achievements in 12th Plan 12
2 Capacity Addition Targets amp Achievements during Oct-2018 and April 2018- Oct 2018 13
3 Installed Capacity in various Regions including their shares 14-19
Section B - Capacity Addition
File NoCEA-CH-14-1142018-Coordination Division
Figures in MW
TARGET ACH TARGET ACH TARGET ACH TARGET ACH
CENTRAL 14878 15869 6004 2584 5300 2000 26182 20453
STATE 13922 22201 1608 2276 0 0 15530 24477
PRIVATE 43540 53661 3285 619 0 0 46825 54280
ALL INDIA 72340 91730 10897 5479 5300 2000 88537 99209
Figures in MW
Thermal Hydro Nuclear Total
Target Ach Target Ach Target Ach Target Ach
Central 4880 3170 800 390 500 6180 3560 5761
State 3546 1760 300 200 0 3846 1960 5096
Private 2940 3780 205 205 0 3145 3985 12671
Total 11366 8710 1305 795 500 0 13171 9505 7217
12
2 CAPACITY ADDITION TARGET AND ACHIEVEMENT FOR 2017-18 (IN MW)
1 Capacity Addtion Targets and Achievements in the 12th Plan
SECTORTHERMAL HYDRO NUCLEAR TOTAL
File NoCEA-CH-14-1142018-Coordination Division
(MW)
Cummulative
Deviation
Target Achievement Target Achievement (+) (-)
Central 2760 250 0 250 0 -250
State 450615 1030 0 1030 69755 -960245
Private 0 0 600 0 600 600
Total 726615 1280 600 1280 669755 -610245
Central 710 0 0 110 110 0
State 130 0 0 12999 30 -9999
Private 0 0 0 0 0 0
Total 840 0 0 23999 140 -9999
Nuclear Central 0 0 0 0 0 0
Central 3470 250 0 360 110 -250
State 463615 1030 0 115999 99755 -1060235
Private 0 0 600 0 600 600
Total 810615 1280 600 151999 809755 -710235
Electricity Generation (MU) Targets and Achievements for 2016-17
13
2 Capacity Addition Targets Achievements During Oct-2018
Schemes Sector
Target 2018-19
April 2018- Oct 2018Oct-18
Hydro
All India
Capacity Addition TargetsAchievements during the Month of Oct-2018
Thermal
12
80
24
0
0
15
20
67
0
14
0
0
81
0
0
200
400
600
800
1000
1200
1400
1600
Thermal Hydro Nuclear Total
MW
Targets and Achievement during 2018-19Target Achievement
600
0 00 0
600
0
100
200
300
400
500
600
700
800
900
1000
Target Achievement
MW
Targets and Achievement during Oct 2018Thermal Hydro
Nuclear Total
File NoCEA-CH-14-1142018-Coordination Division
Coal Gas Diesel Total
State 1593400 287920 000 1881320 000 869755 68956 2820031
Private 2276083 55800 000 2331883 000 251400 1261535 3844818
Central 1258537 234406 000 1492943 162000 849622 32900 2537465
Sub Total 5128020 578126 000 5706146 162000 1970777 1363391 9202314
State 2128000 284982 000 2412982 000 544650 31119 2988751
Private 3488567 467600 000 3956167 000 48100 2005170 6009437
Central 1504295 328067 000 1832362 184000 162000 66130 2244492
Sub Total 7120862 1080649 000 8201511 184000 754750 2102418 11242679
State 1943250 79198 28788 2051236 000 1183803 52102 3287141
Private 1212450 532210 47370 1792030 000 000 3495815 5287845
Central 1422502 35958 000 1458460 332000 000 49190 1839650
Sub Total 4578202 647366 76158 5301726 332000 1183803 3597107 10414636
State 695000 10000 000 705000 000 353792 22511 1081303
Private 637500 000 000 637500 000 39900 84853 762253
Central 1387664 000 000 1387664 000 100520 1000 1489184
Sub Total 2720164 10000 000 2730164 000 494212 108364 3332740
State 000 49771 3600 53371 000 42200 25674 121245
Private 000 2450 000 2450 000 000 2571 5021
Central 52002 125360 000 177362 000 103000 500 280862
Sub Total 52002 177581 3600 233183 000 145200 28745 407128
State 000 000 4005 4005 000 000 525 4530
Private 000 000 000 000 000 000 221 221
Central 000 000 000 000 000 000 510 510
Sub Total 000 000 4005 4005 000 000 1256 5261
State 6359650 711871 36393 7107913 000 2994200 200887 10303000
Private 7614600 1058060 47370 8720030 000 339400 6850164 15909594
Central 5625000 723791 000 6348791 678000 1215142 150230 8392163
Total 19599250 2493722 83763 22176734 678000 4548742 7201281 34604757
Figures at decimal may not tally due to rounding off
Note -
(As per latest information available with MNRE)
Break up of RES all India as on 30092018 is given below (in MW)
450695 3461510 2402166 7201281
A Oct 2018 669755 MW
B Capacity Retired
during
Oct 2018 705 MW
C Oct 2018 0 MW
D Oct 2018 A-B+C -35245 MW
Share of Telangana from JEGURUPADU CCPP Ph II has been removed and the same has been added to private sector of Andhra Pradesh due to expiry of PPA as per
request from TS Transco
Region
ALL INDIA INSTALLED CAPACITY (IN MW) OF POWER STATIONS (As on 31102018)
(UTILITIES)
Net Capacity Added during
1 RES include SHP BP UampI Solar and Wind Energy Installed capacity in respect of RES (MNRE) as on 30092018
Small
Hydro PowerWind Power
Bio-PowerSolar Power
Total
CapacityBM PowerCogen Waste to Energy
2 U-1 to 7 (76995=69755 MW) of LAKWA REPLACEMENT POWER PROJECT commissioned in April 2018 but intimated in October 2018
has been added to state sector of Assam
1 Badarpur TPS (705 MW) has been retired from central sector of Northern Region
Capacity Up-rated
Ownership Sector
873080 13830
Capacity Added during
1 U-2 (600 MW) of MAHAN TPP has been commissioned and added to private sector of Madhya Pradesh
Grand TotalThermalNuclear Hydro
Islands
ALL INDIA
Abbreviation- SHP=Small Hydro Project (le 25 MW) BP=Biomass Power UampI=Urban amp Industrial Waste Power RES=Renewable Energy Sources
Northern Region
Western Region
Southern Region
Eastern Region
North Eastern
Region
RES
(MNRE)
Modewise breakup
File NoCEA-CH-14-1142018-Coordination Division
Coal Gas Diesel Total
State 13500 180040 000 193540 000 000 000 193540
Private 86922 10800 000 97722 000 000 12157 109879
Central 311272 20701 000 331973 10283 72309 000 414565
Sub-Total 411694 211541 000 623235 10283 72309 12157 717984
State 272000 15000 000 287000 000 110282 5930 403212
Private 408078 000 000 408078 000 20000 34745 462823
Central 129472 53561 000 183034 10094 66370181 500 259998
Sub-Total 809550 68561 000 878112 10094 196652 41175 1126032
State 000 000 000 000 000 69460 25661 95121
Private 000 000 000 000 000 99200 60536 159736
Central 18340 6201 000 24541 2895 122388 000 149824
Sub-Total 18340 6201 000 24541 2895 291048 86197 404681
State 000 17500 000 17500 000 123000 12903 153403
Private 000 000 000 000 000 000 5985 5985
Central 50639 12907 000 63547 6798 109188 000 179533
Sub-Total 50639 30407 000 81047 6798 232188 18888 338921
State 176000 15000 000 191000 000 259770 12780 463550
Private 511550 000 000 511550 000 28800 115462 655812
Central 85458 26401 000 111859 19681 92342 000 223882
Sub-Total 773008 41401 000 814409 19681 380912 128242 1343244
State 585000 60380 000 645380 000 109618 2385 757383
Private 388200 000 000 388200 000 10400 710680 1109280
Central 120625 22110 000 142735 55674 73901 29400 301710
Sub-Total 1093825 82490 000 1176315 55674 193919 742465 2168373
State 546900 000 000 546900 000 72410 2510 621820
Private 871433 000 000 871433 000 84200 266691 1222324
Central 379639 54949 000 434588 28948 180253 3000 646789
Sub-Total 1797972 54949 000 1852921 28948 336863 272201 2490933
State 000 000 000 000 000 125215 6787 132002
Private 9900 45000 000 54900 000 8800 52244 115944
Central 34324 6966 000 41290 3124 47554 000 91968
Sub-Total 44224 51966 000 96190 3124 181569 59031 339914
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 3035 3035
Central 3815 1503 000 5317 801 10171 000 16289
Sub-Total 3815 1503 000 5317 801 10171 3035 19324
124953 29105 000 154058 23703 75145 000 252907
State 1593400 287920 000 1881320 000 869755 68956 2820031
Private 2276083 55800 000 2331883 000 251400 1261535 3844818
Central 1258537 234406 000 1492943 162000 849622 32900 2537465
Grand Total 5128020 578126 000 5706146 162000 1970777 1363391 9202314
Uttar Pradesh
Uttarakhand
Chandigarh
Grand TotalThermalNuclear
Hydro
(Renewable)
RES
(MNRE)
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
NORTHERN REGION
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
(As on 31102018)
Central - Unallocated
Total (Northern
Region)
Delhi
Haryana
Himachal Pradesh
Jammu amp Kashmir
Punjab
Rajasthan
State Ownership Sector
Modewise breakup
File NoCEA-CH-14-1142018-Coordination Division
(As on 31102018)
Coal Gas Diesel Total
State 000 000 000 000 000 000 005 005
Private 000 4800 000 4800 000 000 091 4891
Central 45478 1967 000 47445 2600 000 000 50045
Sub-Total 45478 6767 000 52245 2600 000 096 54941
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 1301 1301
Central 12663 4334 000 16997 700 000 000 17697
Sub-Total 12663 4334 000 16997 700 000 1301 18998
State 475000 217782 000 692782 000 77200 800 770782
Private 776567 396000 000 1172567 000 000 729782 1902349
Central 309051 42400 000 351451 55900 000 23830 431181
Sub-Total 1560618 656182 000 2216800 55900 77200 754412 3104312
State 408000 000 000 408000 000 170366 8396 586762
Private 617400 10000 000 627400 000 000 378205 1005605
Central 279441 25700 000 305141 27300 152000 30000 514441
Sub-Total 1304841 35700 000 1340541 27300 322366 416601 2106808
State 228000 000 000 228000 000 12000 1105 241105
Private 849000 000 000 849000 000 000 52430 901430
Central 195344 000 000 195344 4800 10000 000 210144
Sub-Total 1272344 000 000 1272344 4800 22000 53535 1352679
State 1017000 67200 000 1084200 000 285084 20813 1390097
Private 1245600 56800 000 1302400 000 48100 842815 2193315
Central 433475 227273 000 660748 69000 000 12300 742048
Sub-Total 2696075 351273 000 3047348 69000 333184 875927 4325459
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 546 546
Central 17444 6634 000 24078 900 000 000 24978
Sub-Total 17444 6634 000 24078 900 000 546 25524
211400 19759 000 231159 22800 000 000 253959
State 2128000 284982 000 2412982 000 544650 31119 2988751
Private 3488567 467600 000 3956167 000 48100 2005170 6009437
Central 1504295 328067 000 1832362 184000 162000 66130 2244492
Grand Total 7120862 1080649 000 8201511 184000 754750 2102418 11242679
Central - Unallocated
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
WESTERN REGION
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
State Ownership Sector
Modewise breakup
Grand TotalThermalNuclear
Hydro
(Renewable)
RES
(MNRE)
Total (Western
Region)
Goa
Daman amp Diu
Gujarat
Madhya Pradesh
Chhattisgarh
Maharashtra
Dadra amp Nagar
Naveli
File NoCEA-CH-14-1142018-Coordination Division
(As on 31102018)
Coal Gas Diesel Total
State 501000 23540 000 524540 000 167360 4875 696775
Private 387388 381318 3680 772386 000 000 693073 1465459
Central 167456 000 000 167456 12727 000 25000 205183
Sub-Total 1055844 404858 3680 1464382 12727 167360 722948 2367417
State 508250 000 000 508250 000 247993 4022 760265
Private 83945 83182 000 167127 000 000 375048 542175
Central 195612 000 000 195612 14873 000 1000 211485
Sub-Total 787807 83182 000 870989 14873 247993 380070 1513925
State 502000 000 12792 514792 000 359980 15533 890305
Private 195850 000 2520 198370 000 000 1275640 1474010
Central 282920 000 000 282920 69800 000 000 352720
Sub-Total 980770 000 15312 996082 69800 359980 1291173 2717035
State 000 000 15996 15996 000 188150 15402 219548
Private 61500 17400 000 78900 000 000 20899 99799
Central 114322 35958 000 150280 36200 000 5000 191480
Sub-Total 175822 53358 15996 245176 36200 188150 41301 510827
State 432000 52408 000 484408 000 220320 12270 716998
Private 483767 50310 41170 575247 000 000 1130984 1706231
Central 448952 000 000 448952 144800 000 18190 611942
Sub-Total 1364719 102718 41170 1508607 144800 220320 1161444 3035171
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 000 000
Central 10000 000 000 10000 000 000 000 10000
Sub-Total 10000 000 000 10000 000 000 000 10000
State 000 3250 000 3250 000 000 000 3250
Private 000 000 000 000 000 000 171 171
Central 24840 000 000 24840 8600 000 000 33440
Sub-Total 24840 3250 000 28090 8600 000 171 36861
178400 000 000 178400 45000 000 000 223400
State 1943250 79198 28788 2051236 000 1183803 52102 3287141
Private 1212450 532210 47370 1792030 000 000 3495815 5287845
Central 1422502 35958 000 1458460 332000 000 49190 1839650
Grand Total 4578202 647366 76158 5301726 332000 1183803 3597107 10414636
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
SOUTHERN REGION
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
State Ownership Sector
Modewise breakup
Grand TotalThermal RES
(MNRE)Nuclear
Hydro
(Renewable)
Kerala
Tamil Nadu
NLC
Puducherry
Central - Unallocated
Total (Southern
Region)
Andhra Pradesh
Telangana
Karnataka
File NoCEA-CH-14-1142018-Coordination Division
(As on 31102018)
Coal Gas Diesel Total
State 71000 000 000 71000 000 000 7070 78070
Private 28100 000 000 28100 000 000 25545 53645
Central 291433 000 000 291433 000 11000 000 302432
Sub-Total 390533 000 000 390533 000 11000 32615 434147
State 42000 000 000 42000 000 13000 405 55405
Private 73000 000 000 73000 000 000 3207 76207
Central 39374 000 000 39374 000 6100 000 45474
Sub-Total 154374 000 000 154374 000 19100 3612 177086
State 540000 10000 000 550000 000 98600 9195 657795
Private 242500 000 000 242500 000 000 34452 276952
Central 76077 000 000 76077 000 41000 000 117077
Sub-Total 858577 10000 000 868577 000 139600 43647 1051824
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 000 000
Central 698504 000 000 698504 000 18620 000 717124
Sub-Total 698504 000 000 698504 000 18620 000 717124
State 42000 000 000 42000 000 206192 630 248822
Private 293900 000 000 293900 000 000 21648 315548
Central 163390 000 000 163390 000 8900 1000 173290
Sub-Total 499290 000 000 499290 000 215092 23278 737660
State 000 000 000 000 000 36000 5211 41211
Private 000 000 000 000 000 39900 001 39901
Central 8703 000 000 8703 000 6400 000 15103
Sub-Total 8703 000 000 8703 000 82300 5212 96215
110183 000 000 110183 000 8501 000 118684
State 695000 10000 000 705000 000 353792 22511 1081303
Private 637500 000 000 637500 000 39900 84853 762253
Central 1387664 000 000 1387664 000 100520 1000 1489184
Grand Total 2720164 10000 000 2730164 000 494212 108364 3332740
(As on 31102018)
Coal Gas Diesel Total
State 000 32821 000 32821 000 10000 3001 45822
Private 000 2450 000 2450 000 000 1680 4130
Central 27902 43556 000 71458 000 36851 000 108309
Sub-Total 27902 78827 000 106729 000 46851 4681 158261
State 000 000 000 000 000 000 10710 10710
Private 000 000 000 000 000 000 539 539
Central 2470 4682 000 7152 000 11800 000 18952
Sub-Total 2470 4682 000 7152 000 11800 11249 30201
State 000 000 000 000 000 32200 3103 35303
Private 000 000 000 000 000 000 006 006
Central 3040 10969 000 14009 000 7446 000 21455
Sub-Total 3040 10969 000 14009 000 39646 3109 56764
State 000 16950 000 16950 000 000 1601 18551
Private 000 000 000 000 000 000 009 009
Central 3740 43695 000 47435 000 7077 500 55012
Sub-Total 3740 60645 000 64385 000 7077 2110 73572
State 000 000 3600 3600 000 000 545 4145
Private 000 000 000 000 000 000 217 217
Central 3140 7157 000 10297 000 9677 000 19974
Sub-Total 3140 7157 3600 13897 000 9677 762 24336
State 000 000 000 000 000 000 3067 3067
Private 000 000 000 000 000 000 100 100
Central 2140 4893 000 7033 000 5860 000 12893
Sub-Total 2140 4893 000 7033 000 5860 3167 16060
State 000 000 000 000 000 000 3647 3647
Private 000 000 000 000 000 000 020 020
Central 2070 4046 000 6116 000 9913 000 16029
Sub-Total 2070 4046 000 6116 000 9913 3667 19696
7500 6362 000 13862 000 14376 000 28238
State 000 49771 3600 53371 000 42200 25674 121245
Private 000 2450 000 2450 000 000 2571 5021
Central 52002 125360 000 177362 000 103000 500 280862
Grand Total 52002 177581 3600 233183 000 145200 28745 407128
Central - Unallocated
Total (Eastern
Region)
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
NORTH-EASTERN REGION
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
State Ownership Sector
Modewise breakup
Grand TotalThermalNuclear
Bihar
Jharkhand
West Bengal
DVC
Odisha
Sikkim
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
EASTERN REGION
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
Ownership Sector
Modewise breakup
Grand TotalThermalNuclear
Hydro
(Renewable)
RES
(MNRE)
Manipur
Nagaland
State
Mizoram
Central - Unallocated
Total (North-
Eastern Region)
Hydro
(Renewable)
RES
(MNRE)
Assam
Arunachal Pradesh
Meghalaya
Tripura
File NoCEA-CH-14-1142018-Coordination Division
(As on 31102018)
Coal Gas Diesel Total
State 000 000 4005 4005 000 000 525 4530
Private 000 000 000 000 000 000 146 146
Central 000 000 000 000 000 000 510 510
Sub-Total 000 000 4005 4005 000 000 1181 5186
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 075 075
Central 000 000 000 000 000 000 000 000
Sub-Total 000 000 000 000 000 000 075 075
State 000 000 4005 4005 000 000 525 4530
Private 000 000 000 000 000 000 221 221
Central 000 000 000 000 000 000 510 510
Grand Total 000 000 4005 4005 000 000 1256 5261
19
Andaman amp
Nicobar
lakshadweep
Total (Islands)
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
State Ownership Sector
Modewise breakup
Grand TotalThermalNuclear
Hydro
(Renewable)
RES
(MNRE)
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
ISLANDS
File NoCEA-CH-14-1142018-Coordination Division
SrNo Contents Page
1 Executive summary of Target and Achievement of Transmission Lines during 2018-19
20(1)
2 List of Transmission Lines CommissionedReady for commissioning during Oct-2018 20(2)
Section C - Transmission Lines
File NoCEA-CH-14-1142018-Coordination Division
Executive summary of Target and Achievement of Transmission Lines during 2018-19 As on Oct-18
(All figures in circuit kms)
Centr
al S
ecto
r
Sta
te S
ecto
r
JV
Private
Secto
r
To
tal
Centr
al S
ecto
r
Sta
te S
ecto
r
JV
Private
Secto
r
To
tal
Centr
al S
ecto
r
Sta
te S
ecto
r
JV
Private
Secto
r
To
tal
Centr
al S
ecto
r
Sta
te S
ecto
r
JV
Private
Secto
r
To
tal
Centr
al S
ecto
r
Sta
te S
ecto
r
JV
Private
Secto
r
To
tal
Cen
tral S
ecto
r
Sta
te S
ecto
r
JV
Pri
vate
Secto
r
Gra
nd
To
tal
0 0 0 0 0 0 0 0 4692 766 827 6285 3045 5906 980 9931 553 5878 0 6431 8290 12550 1807 22647
Oct18 Programme 0 0 0 0 0 0 0 0 300 0 0 300 662 90 562 1314 0 723 0 723 962 813 562 2337
Achievement 0 0 0 0 0 0 0 0 729 0 0 729 471 266 0 737 0 401 0 401 1200 667 0 1867
Upto Oct-18 Programme 0 0 0 0 0 0 0 0 3004 416 0 3420 1350 3109 562 5021 481 4346 0 4827 4835 7871 562 13268
Achievement 0 0 0 0 0 0 0 0 2286 0 178 2464 1436 1783 1595 4814 60 4461 0 4521 3782 6244 1773 11799
20(1)
220 kV Grand Total 800 kV 500 kV
Programme 2018-19
Programme
Achievement
HVDC765 kV 400 kV
File NoCEA-CH-14-1142018-Coordination Division
SlNo Line
Length
(cKM)
1 2 3 4 5 6
1 765 Jharsuguda - Dharamjaygarh line DC PGCIL 296
2 765LILO of Kurnool - Thirvualam line at
CuddapahDC PGCIL 190
3 765 Salem PS - Madhugiri PS line SC PGCIL 243
4 400 Cuddapah - Hindupur line (Q) DC PGCIL 338
5 400LILO of Both Ckt of Bamnauli - Samaypur at
TughlakabadMC PGCIL 114
6 400LILO-Out of Cuddapah - Hindupur line (Q)
(Both Ckts) at NP Kunta ssDC PGCIL 19
1200
7 400LILO of Sterlite - Meramundali at Lapanga
4oo kV ssDC OPTCL 14
8 400 Sterlite - Lapanga line DC OPTCL 37
9 400 TMDC Podili - Sattapenalli line DC APTRANSCO 215
10 230Neyveli 230110 kV ss - Eachangadu
230kV FeederSC TANTRANSCO 1
11 230 NNTPS - Neyveli 230110kV ss DC TANTRANSCO 2
12 220 Ajmer (400 kV) - Bherunda (TK) DC RVPNL 100
13 220 Aligarh - Atrauli line DC UPPTCL 77
14 220 Khandwa - Chhanera line DC MPPTCL 78
15 220LILO of one Ckt of Hadala - Sartanpar line
at Wankaner on MC towersDC GETCO 6
16 220 LILO of one Ckt of Vita - Miraj at Alkud ss DC MSETCL 27
17 220 Mendhigiri - Alkud ss DC MSETCL 110
667
1867
20(2)
Grand Total
2Transmission Lines (220 kV and above) CommissionedReady for commissioning During Oct-2018
As on 31-10-18
Voltage
Level (kV)Name of Transmission Lines
Circuit
Type
Executing
Agency
CENTRAL SECTOR
Total of CENTRAL SECTOR
STATE SECTOR Sector
Total of STATE SECTOR
File NoCEA-CH-14-1142018-Coordination Division
SN Contents Page
1 Executive summary of Target and Achievement of Substations during 2018-19 21(1)
2Sub Stations (220 kV and above) commissionedready for commisssioning during Oct-
201821(2)
Section D - Sub Stations
File NoCEA-CH-14-1142018-Coordination Division
1 Executive summary of Target and Achievement of Substations during 2018-19 As on Oct-18
(All figures in circuit MVA)
Centr
al S
ecto
r
Sta
te S
ecto
r
JV
Private
Secto
r
To
tal
Centr
al S
ecto
r
Sta
te S
ecto
r
JV
Private
Secto
r
To
tal
Centr
al S
ecto
r
Sta
te S
ecto
r
JV
Private
Secto
r
To
tal
Centr
al S
ecto
r
Sta
te S
ecto
r
JV
Private
Secto
r
To
tal
Centr
al S
ecto
r
Sta
te S
ecto
r
JV
Private
Secto
r
To
tal
Cen
tral S
ecto
r
Sta
te S
ecto
r
JV
Pri
vate
Secto
r
Gra
nd
To
tal
3000 0 0 3000 0 0 0 0 22200 0 0 22200 8185 13085 630 21900 740 14760 0 15500 34125 27845 630 62600
Oct18 Programme 0 0 0 0 0 0 0 0 0 0 0 0 1000 1260 630 2890 0 1400 0 1400 1000 2660 630 4290
Achievement 0 0 0 0 0 0 0 0 3000 0 0 3000 1500 3120 0 4620 0 2220 0 2220 4500 5340 0 9840
Upto Oct-18 Programme 0 0 0 0 0 0 0 0 10000 0 0 10000 6130 7435 630 14195 0 9670 0 9670 16130 17105 630 33865
Achievement 0 0 0 0 0 0 0 0 14000 0 0 14000 9000 7550 630 17180 0 10610 0 10610 23000 18160 630 41790
21(1)
220 kV Grand Total 800 kV 500 kV
Programme 2018-19
Programme
Achievement
HVDC765 kV 400 kV
File NoCEA-CH-14-1142018-Coordination Division
As on 31-10-18
Sl Voltage Ratio Capacity
No (kVkV) (MWMVA)
1 2 3 4 5
1 Cuddapah Ss 765400 PGCIL 3000
2 Tughlakabad SS (GIS) 400220 PGCIL 1500
Total of CENTRAL SECTOR 4500
3 Panki Kanpur (Aug) TF-I 400200 UPPTCL 75
4 Hindupur ss (1st ICT) 400220 APTRANSCO 315
5 Thappagundu ss 400110 TANTRANSCO 600
6 Mendhasal (2nd power TF) 400220 OPTCL 20
7 Jodhpur ss (New) 400220 RVPNL 315
8 Shankarpally 400220 TSTRANSCO 500
9 Podili ss (1st ICT) 400220 APTRANSCO 315
10 Doni (Gadag)SS 400220 KPTCL 1000
11 Porur (Addl TF) 230110 TANTRANSCO 100
12 Anuppankulam (Addl TF) 230110 TANTRANSCO 60
13 Neyveli SS 230110 TANTRANSCO 480
14 Savarkundla (Aug) 22066 GETCO 60
15 Bhuna (Aug) 220132 HVPNL 100
16 Madanpur (Aug) 22066 HVPNL 100
17 Gurgaon Sec-52A (Aug) 22066 HVPNL 160
18 IA Hisar (Aug) 220132 HVPNL 50
19 Narwana (Aug) 220132 HVPNL 60
20 Therubali (3rd Auto TF) 220132 OPTCL 160
21 Halasar ss 220132 RVPNL 160
22 Bansi Siddaharthnagar (Aug) TF-I 220132 UPPTCL 60
23 Hata Kushinagar (New) TF-I 220132 UPPTCL 100
24 Gomti nagar Lucknow (Aug) TF-IV 22033 UPPTCL 60
25 Kanpur Road Lucknow (New) TF-III 22033 UPPTCL 60
26 Asoj (Aug) 22066 GETCO 150
27 Kangasiyali (Aug) 22066 GETCO 60
28 Karmsad (Aug) 22066 GETCO 160
29 Lalpar (Aug) 22066 GETCO 60
TOTAL STATE SECTOR 5340
GRAND TOTAL 9840
21(2)
PRIVATE SECTOR
CENTRAL SECTOR
STATE SECTOR
2Sub-Stations (220 kV and above) CommissionedReady for commissioning During Oct-2018
Name of Sub StationsExecuting
Agency
File NoCEA-CH-14-1142018-Coordination Division
SN Contents Page
1 Electricity Generation (MU) Targets and Achievements for 2018-19 22
Section E - Electricity Generation
File NoCEA-CH-14-1142018-Coordination Division
Programme Achievement Ach Programme Achievement Ach
Central Sector 35160700 3028100 3162321 10443 20144400 21150469 10499
State Sector 35132000 3010000 3017260 10024 19922100 19549030 9813
PvtIPP Sector 36999700 3240600 3375603 10417 21598300 20794155 9628
PvtUTL Sector 1857600 164500 180597 10979 1130900 1203107 10638
Total 109150000 9443200 9735781 10310 62795700 62696761 9984
Central Sector 5617600 420900 451004 10715 4193000 4045436 9648
State Sector 6110600 559500 708469 12663 4049400 4433000 10947
PvtIPP Sector 1141800 80500 90122 11195 976400 1021963 10467
PvtUTL Sector 130000 11300 12564 11119 76700 99943 13030
Total 13000000 1072200 1262159 11772 9295500 9600342 10328
Central Sector 3850000 353300 303310 8585 2068900 2203540 10651
Total 3850000 353300 303310 8585 2068900 2203540 10651
Bhutan Import 500000 63300 35395 5592 347000 416660 12007
Central Sector 44628300 3802300 3916635 10301 26406300 27399445 10376
State Sector 41242600 3569500 3725729 10438 23971500 23982030 10004
Pvt Sector 40129100 3496900 3658886 10463 23782300 23119168 9721
Total 126500000 10932000 11336645 10370 74507100 74917303 10055
Provisional based on actual-cum-Assesment
Figs in MU
Cummulative
Achievement
Cummulative
Achievement
Sep-18 Sep-17 Upto Sep-2018 Upto Sep-2017
1073794 748889 7332680 5660929
22
Renewable Energy Generation
Achievement
Oct-2018
1 Electricity Generation (MU) Targets and Achievememts for 2018-19
All India Energy Generation During April 2018- Oct 2018 (MU)
Target (2018-19)April 2018- Oct 2018
Sector
Hydro
Thermal
Nuclear
627957
92955
20689
745071
626968
96003
22035
749173
0
100000
200000
300000
400000
500000
600000
700000
800000
Thermal Hydro Nuclear Total
Programme
Achievement
File NoCEA-CH-14-1142018-Coordination Division
SN Contents Page
1 Energy Power Supply Position (Provisional) for Oct-2018 and during April 2018- Oct 2018 23
2 Peak Power Supply Position (Provisional) for Oct-2018 and during April 2018- Oct 2018 24
3 Energy Power Supply Position (Revised) for Sep-2018 and during April 2018- Sept 2018 25
4 Peak Power Supply Position (Revised) for Sep-2018 and during April 2018- Sept 2018 26
5 Notified Power cuts Restrictions on Industries during Oct-2018 27
6 Power Supply to Agricultural Sector during Oct-2018 28
Section F - Power supply position
File NoCEA-CH-14-1142018-Coordination Division
आकड़ मममलयन यननट नट Figures in MU net
ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied
कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )
चडीगढ़ Chandigarh 108 108 0 00 1055 1055 0 00
दिलली Delhi 2490 2489 1 00 22524 22510 14 01
हरियजणज Haryana 4554 4554 0 00 35205 35205 0 00
दहमजचल परिश Himachal Pradesh 788 787 2 02 5728 5560 168 29
रमम कशमीि Jammu amp Kashmir 1497 1219 278 186 10982 8865 2117 193
परजब Punjab 4418 4418 0 00 38832 38819 13 00
िजरसथजन Rajasthan 6748 6748 0 00 45341 45181 160 04
उतति परिश Uttar Pradesh 10136 9973 164 16 75485 74808 676 09
उततिजखड Uttarakhand 1083 1081 3 03 8395 8310 85 10
उततरी कषतर Northern Region 31822 31375 447 14 243547 240314 3233 13
छततीसगढ़ Chhattisgarh 2454 2453 1 00 16119 16091 28 02
गरिजत Gujarat 11636 11636 0 00 70782 70768 14 00
मधय परिश Madhya Pradesh 5860 5859 1 00 38412 38410 2 00
महजिजषटर Maharashtra 15223 15095 128 08 95489 95355 134 01
िमन औि दिउ Daman amp Diu 216 216 0 00 1523 1523 0 00
िजिि व नगि हवली Dadra amp Nagar Haveli 553 553 0 00 3757 3757 0 00
गोवज Goa 366 366 0 00 2497 2495 2 01
पशचिमी कषतर Western Region 36308 36178 130 04 228579 228398 180 01
आनधर परिश Andhra Pradesh 5860 5854 6 01 37377 37334 43 01
तलगजनज Telangana 6748 6742 6 01 38251 38205 46 01
कनजाटक Karnataka 5842 5835 7 01 39111 39059 52 01
किल Kerala 2116 2096 20 09 14256 14160 96 07
तममल नजड Tamil Nadu 8611 8601 10 01 65742 65666 76 01
पडचिी Puducherry 216 215 1 05 1654 1646 8 05
लकष-दवीप Lakshadweep 4 4 0 0 27 27 0 0
दकषकषणी कषतर Southern Region 29392 29342 50 02 196390 196069 321 02
बबहजि Bihar 2742 2738 4 01 19143 18951 192 10
िजमोिि घजटी ननगम DVC 1712 1698 13 08 13096 12828 268 20
झजिखणड Jharkhand 701 697 4 06 5022 4949 73 15
ओडडशज Odisha 3147 3134 13 04 20224 20192 32 02
पशशचम बगजल West Bengal 4204 4200 4 01 33008 32881 127 04
मसशककम Sikkim 40 40 0 00 279 279 0 01
अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 67 202 188 13 67
परवी कषतर Eastern Region 12547 12507 40 03 90772 90080 692 08
अरणजचल परिश Arunachal Pradesh 67 66 1 09 502 496 7 13
असम Assam 833 809 24 29 6153 5903 250 41
मणणपि Manipur 72 71 1 10 485 478 7 14
मघजलय Meghalaya 147 147 0 00 1043 1042 0 00
ममज़ोिम Mizoram 63 62 1 08 365 359 5 14
नजगजलड Nagaland 76 67 8 110 540 481 59 109
बिपिज Tripura 130 129 1 09 1025 1007 19 18
उततर-परवी कषतर North-Eastern Region 1387 1351 35 25 10113 9766 346 34
समपणण भारत All India 111455 110753 702 06 769399 764627 4773 06
23
ऊराण वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Energy Power Supply Position Report (Provisional)
राजयStateअकरबर2018 October2018 अपरल2018 -अकरबर2018 April2018 to October2018
ऊरजा पनत ा म कमी ऊरजा पनत ा म कमीEnergy not Supplied
Excludes energy exported to Bangladesh
Energy not Supplied
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
File NoCEA-CH-14-1142018-Coordination Division
अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met
कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )
चडीगढ़ Chandigarh 217 217 0 00 369 369 0 00
दिलली Delhi 4713 4713 0 00 7016 7016 0 00
हरियजणज Haryana 7948 7948 0 00 10270 10270 0 00
दहमजचल परिश Himachal Pradesh 1520 1520 0 00 1520 1520 0 00
रमम कशमीि Jammu amp Kashmir 2836 2269 567 200 2951 2361 590 200
परजब Punjab 7979 7979 0 00 12638 12638 0 00
िजरसथजन Rajasthan 11450 11450 0 00 11698 11698 0 00
उतति परिश Uttar Pradesh 17434 16745 688 39 20498 20062 436 21
उततिजखड Uttarakhand 1943 1943 0 00 2143 2143 0 00
उततरी कषतर Northern Region 50659 49635 1024 20 63166 61726 1440 23
छततीसगढ़ Chhattisgarh 4414 4268 146 33 4414 4268 146 33
गरिजत Gujarat 18148 18130 19 01 18148 18130 19 01
मधय परिश Madhya Pradesh 11356 11317 39 03 11356 11317 39 03
महजिजषटर Maharashtra 23864 23159 705 30 23864 23254 610 26
िमन औि दिउ Daman amp Diu 342 341 1 02 357 356 1 02
िजिि व नगि हवली Dadra amp Nagar Haveli 784 780 4 05 816 815 1 01
गोवज Goa 536 536 0 00 596 596 0 00
पशचिमी कषतर Western Region 56548 55695 853 15 56548 55695 853 15
आनधर परिश Andhra Pradesh 9435 9435 0 00 9435 9435 0 00
तलगजनज Telangana 10603 10603 0 00 10815 10815 0 00
कनजाटक Karnataka 10741 10741 0 00 10741 10741 0 00
किल Kerala 3727 3644 83 22 4050 3997 53 13
तममल नजड Tamil Nadu 14747 14333 414 28 15029 14981 47 03
पडचिी Puducherry 363 362 1 03 420 400 19 46
लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0
दकषकषणी कषतर Southern Region 45279 45226 53 01 45946 45684 262 06
बबहजि Bihar 4945 4945 0 00 5050 5045 5 01
िजमोिि घजटी ननगम DVC 2729 2729 0 00 2874 2874 0 00
झजिखणड Jharkhand 1260 1260 0 00 1339 1284 55 41
ओडडशज Odisha 5624 5224 400 71 5624 5357 268 48
पशशचम बगजल West Bengal 8775 8775 0 00 9130 9123 7 01
मसशककम Sikkim 86 86 0 00 90 90 0 00
अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7
परवी कषतर Eastern Region 22959 22567 392 17 22959 22567 392 17
अरणजचल परिश Arunachal Pradesh 138 125 13 94 138 133 5 37
असम Assam 1785 1704 81 45 1865 1809 56 30
मणणपि Manipur 187 185 2 11 193 186 7 36
मघजलय Meghalaya 336 336 0 00 371 368 2 07
ममज़ोिम Mizoram 99 97 2 20 103 98 4 41
नजगजलड Nagaland 134 131 3 22 156 138 18 117
बिपिज Tripura 269 269 0 00 298 293 5 17
उततर-परवी कषतर North-Eastern Region 2790 2700 90 32 2967 2850 117 39
समपणण भारत All India 172945 170604 2341 14 177022 175528 1494 08
24
अधिकतम वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Peak Power Supply Position Report (Provisional)
आकड़ मगज वजट नट Figures in MW netअपरल2018 -अकरबर2018 April2018 to October2018
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
मजग की पनता म कमी Demand not Met
Excludes the supply to Bangladesh
राजयStateअकरबर2018 October2018
मजग की पनता म कमी Demand not Met
File NoCEA-CH-14-1142018-Coordination Division
आकड़ मममलयन यननट नट Figures in MU net
ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied
कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )
चडीगढ़ Chandigarh 141 141 0 00 947 947 0 00
दिलली Delhi 2925 2924 1 00 20034 20021 13 01
हरियजणज Haryana 4794 4794 0 00 30651 30651 0 00
दहमजचल परिश Himachal Pradesh 876 853 24 27 4940 4773 167 34
रमम कशमीि Jammu amp Kashmir 1520 1246 274 180 9485 7646 1839 194
परजब Punjab 5575 5575 0 00 34414 34401 13 00
िजरसथजन Rajasthan 6202 6201 0 00 38594 38434 160 04
उतति परिश Uttar Pradesh 10211 10124 86 08 65349 64836 513 08
उततिजखड Uttarakhand 1162 1149 13 11 7311 7229 82 11
उततरी कषतर Northern Region 33405 33008 398 12 211725 208939 2786 13
छततीसगढ़ Chhattisgarh 2403 2388 15 06 13665 13638 27 02
गरिजत Gujarat 10122 10122 0 00 59146 59132 14 00
मधय परिश Madhya Pradesh 5492 5491 1 00 32552 32551 1 00
महजिजषटर Maharashtra 13615 13612 3 00 80266 80260 6 00
िमन औि दिउ Daman amp Diu 221 221 0 00 1306 1306 0 00
िजिि व नगि हवली Dadra amp Nagar Haveli 551 551 0 00 3204 3204 0 00
गोवज Goa 339 339 0 00 2131 2128 2 01
पशचिमी कषतर Western Region 32742 32723 19 01 192270 192220 50 00
आनधर परिश Andhra Pradesh 5294 5287 7 01 31518 31480 37 01
तलगजनज Telangana 6279 6272 8 01 31503 31463 40 01
कनजाटक Karnataka 5701 5693 8 01 33269 33225 45 01
किल Kerala 2050 2026 24 12 12140 12063 76 06
तममल नजड Tamil Nadu 8971 8959 12 01 57131 57065 66 01
पडचिी Puducherry 226 224 2 08 1438 1431 7 05
लकष-दवीप Lakshadweep 4 4 0 0 23 23 0 0
दकषकषणी कषतर Southern Region 28520 28460 60 02 166998 166727 271 02
बबहजि Bihar 2839 2793 46 16 16400 16213 188 11
िजमोिि घजटी ननगम DVC 1901 1750 151 79 11384 11130 254 22
झजिखणड Jharkhand 740 723 17 22 4321 4252 69 16
ओडडशज Odisha 2921 2918 3 01 17077 17058 19 01
पशशचम बगजल West Bengal 4902 4879 23 05 28804 28681 123 04
मसशककम Sikkim 39 39 0 01 239 239 0 01
अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 67 173 162 12 67
परवी कषतर Eastern Region 13341 13102 240 18 78225 77573 652 08
अरणजचल परिश Arunachal Pradesh 74 73 1 10 435 429 6 14
असम Assam 950 914 36 38 5320 5094 226 43
मणणपि Manipur 70 69 1 11 414 408 6 15
मघजलय Meghalaya 150 150 0 01 896 896 0 01
ममज़ोिम Mizoram 58 57 1 12 302 297 5 16
नजगजलड Nagaland 80 72 8 104 464 414 50 108
बिपिज Tripura 192 191 1 07 895 878 17 19
उततर-परवी कषतर North-Eastern Region 1575 1527 48 31 8726 8415 311 36
समपणण भारत All India 109584 108819 765 07 657944 653873 4071 06
Energy not Supplied Energy not Supplied
ससतबर2018 September2018 अपरल2018 -ससतबर2018 April2018 to September2018
ऊरजा पनत ा म कमी ऊरजा पनत ा म कमी
Excludes energy exported to Bangladesh
राजयState
ऊराण वरवदयत आपरतण शथिरत ररपोरण (सशोधित) Energy Power Supply Position Report (Revised)
25
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
File NoCEA-CH-14-1142018-Coordination Division
अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met
कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )
चडीगढ़ Chandigarh 293 293 0 00 369 369 0 00
दिलली Delhi 5358 5358 0 00 7016 7016 0 00
हरियजणज Haryana 9008 9008 0 00 10270 10270 0 00
दहमजचल परिश Himachal Pradesh 1466 1466 0 00 1479 1479 0 00
रमम कशमीि Jammu amp Kashmir 2951 2361 590 200 2951 2361 590 200
परजब Punjab 11405 11405 0 00 12638 12638 0 00
िजरसथजन Rajasthan 10612 10612 0 00 11698 11698 0 00
उतति परिश Uttar Pradesh 18346 18121 225 12 20498 20062 436 21
उततिजखड Uttarakhand 1996 1996 0 00 2143 2143 0 00
उततरी कषतर Northern Region 56407 55649 758 13 63166 61726 1440 23
छततीसगढ़ Chhattisgarh 4404 4075 328 75 4404 4136 268 61
गरिजत Gujarat 16963 16963 0 00 17053 16963 90 05
मधय परिश Madhya Pradesh 8811 8771 41 05 8811 8775 36 04
महजिजषटर Maharashtra 22455 22349 106 05 23395 23254 141 06
िमन औि दिउ Daman amp Diu 357 356 1 02 357 356 1 02
िजिि व नगि हवली Dadra amp Nagar Haveli 816 815 1 01 816 815 1 01
गोवज Goa 596 596 0 00 596 596 0 00
पशचिमी कषतर Western Region 52933 52895 38 01 53841 52895 945 18
आनधर परिश Andhra Pradesh 9435 9416 19 02 9435 9416 19 02
तलगजनज Telangana 10815 10815 0 00 10815 10815 0 00
कनजाटक Karnataka 10103 10090 13 01 10690 10688 2 00
किल Kerala 3888 3638 251 64 4050 3997 53 13
तममल नजड Tamil Nadu 14556 14553 3 00 15029 14981 47 03
पडचिी Puducherry 390 372 17 45 420 400 19 46
लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0
दकषकषणी कषतर Southern Region 45542 45428 114 02 45946 45684 262 06
बबहजि Bihar 5050 5045 5 01 5050 5045 5 01
िजमोिि घजटी ननगम DVC 2641 2641 0 00 2874 2874 0 00
झजिखणड Jharkhand 1233 1233 0 00 1339 1284 55 41
ओडडशज Odisha 4906 4906 0 00 5357 5357 0 00
पशशचम बगजल West Bengal 8644 8639 5 01 9130 9123 7 01
मसशककम Sikkim 78 78 0 00 90 90 0 00
अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7
परवी कषतर Eastern Region 22110 22100 10 00 22470 22290 180 08
अरणजचल परिश Arunachal Pradesh 132 130 2 15 138 133 5 37
असम Assam 1865 1809 56 30 1865 1809 56 30
मणणपि Manipur 184 182 2 13 193 186 7 36
मघजलय Meghalaya 317 317 0 00 371 368 2 07
ममज़ोिम Mizoram 95 93 2 23 103 98 4 41
नजगजलड Nagaland 142 138 5 32 156 138 18 117
बिपिज Tripura 296 293 3 10 298 293 5 17
उततर-परवी कषतर North-Eastern Region 2921 2850 71 24 2967 2850 117 39
समपणण भारत All India 177022 175528 1494 08 177022 175528 1494 08
26
मजग की पनता म कमी मजग की पनता म कमी Demand not MetDemand not Met
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
Excludes the supply to Bangladesh
अधिकतम वरवदयत आपरतण शथिरत ररपोरण (सशोधित) Peak Power Supply Position Report (Revised)
आकड़ मगज वजट नट Figures in MW net
राजयStateससतबर2018 September2018 अपरल2018 -ससतबर2018 April2018 to September2018
File NoCEA-CH-14-1142018-Coordination Division
अकरबर2018 October2018अपरल2018 -अकरबर2018 April2018 to October2018
उततरी कषतर Northern Region
चडीगढ़ Chandigarh Data not received Data not received
दिलली Delhi
हरियजणज Haryana
दहमजचल परिश Himachal Pradesh
रमम कशमीि Jammu amp Kashmir Data not received Data not received
परजब Punjab
िजरसथजन Rajasthanउतति परिश Uttar Pradesh
उततिजखड Uttarakhand
पशचिमी कषतर Western Region
छततीसगढ़ Chhattisgarh
गरिजत Gujarat
मधय परिश Madhya Pradesh
महजिजषटर Maharashtra
गोवज Goa
दकषकषणी कषतर Southern Region
आनधर परिश Andhra Pradesh
तलगजनज Telangana
कनजाटक Karnataka
किल Kerala
तममल नजड Tamil Nadu
पडचिी Puducherryपरवी कषतर Eastern Region
बबहजि Bihar
झजिखणड Jharkhand
ओडडशज Odisha
पशशचम बगजल West Bengal
N
o No
tified
Cuts
N
o No
tified
Cuts
27
अकरबर 2018 म इडथरीर पर वरवदयत करौती का वरवरवरण Notified Power CutsRestrictions on Industries during October2018
राजय कषतर State Regionऊराणमाग करौती EnergyDemand Cut
No Notified Cuts No Notified Cuts
File NoCEA-CH-14-1142018-Coordination Division
अकरबर2018 October2018अपरल2018 -अकरबर2018 April2018 to October2018
उततरी कषतर Northern Region
चडीगढ़ Chandigarh Data not received Data not received
दिलली Delhi Data not received Data not received
हरियजणज Haryana 940 hrsday 0709 - 0950 hrsday
दहमजचल परिश Himachal Pradesh No cut imposed on agriculture consumers and uninterrupted
power is being supplied to agriculture sector
HPSEBL has only 2 agriculture consumers and uninterrupted
power is being supplied to agriculture sector
रमम कशमीि Jammu amp Kashmir Data not received Data not received
परजब Punjab 0507 hrsday 0349 - 0844 hrsday
िजरसथजन Rajasthan 0630 hrsday 0630 hrsday
उतति परिश Uttar Pradesh 1825 hrsday 1814 - 1858 hrsday
उततिजखड Uttarakhand 2350 hrsday 2128 - 2357 hrsday
पशचिमी कषतर Western Region
छततीसगढ़ Chhattisgarh 18hoursday 18 hrsday
गरिजत Gujarat 805 hrsday 805 hrsday
मधय परिश Madhya Pradesh Three-Phase Supply(Irrigation)-947 hrs day
Three-Phase (Mixed) Supply - 2311 hrs day
Three-Phase Supply(Irrigation)- 0933 - 0947 hrs day Three-
Phase (Mixed) Supply - 2300 - 2320 hrs day
महजिजषटर Maharashtra Three-Phase Supply(Irrigation)- 9 hrs day
Three-Phase (Mixed) Supply - 24 hrs day
Three-Phase Supply(Irrigation)- 9 hrs day
Three-Phase (Mixed) Supply - 24 hrs day
गोवज Goa No restriction No restriction
दकषकषणी कषतर Southern Region
आनधर परिश Andhra Pradesh 07 hrsday 07 hrsday
तलगजनज Telangana 24 hoursday 24 hoursday
कनजाटक Karnataka 6 hrsday 6 hrsday
किल Kerala No Restrictions No Restrictions
तममल नजड Tamil Nadu 9 hrsday (6 hrs during day time and 3 hrs during night time) 9 hrsday (6 hrs during day time and 3 hrs during night time)
पडचिी Puducherry No Restrictions No Restrictions
परवी कषतर Eastern Region
बबहजि Bihar About 18 hrsday About 18 hrsday
झजिखणड Jharkhand About 20 hrsday About 20 hrsday
ओडडशज Odisha 24 hrsday 24 hrsday
पशशचम बगजल West Bengal About 23 hrsday About 23 hrsday
28
अकटबर 2018 कषि कषतर को षिदयत आपरति का षििरण Power Supply to Agricultural Sector during October2018
राजय कषतर State Regionऔसत वरवदयत आपरतण घनरो म Average Hours of Supply
On segregated feeders
File NoCEA-CH-14-1142018-Coordination Division
SNo Contents Page
1 Growth of Installed Capacity since 6th Plan 29
2 Progress of Transmission Sector since 6th Plan 30
3 All India Yearly Coal consumption for Power Generation (Utilities)
4 All India Annual Per Capita Consumption of Electricity since -2006
5 Average cost of power supply amp Average realisation (Paisakwh)
6 Growth of Rural Electrification amp Pump Sets Energisation
7 Status of Hydro Schemes Cleared by the CEA in Oct-2018
Section G - Growth of Power Sector
31
32
File NoCEA-CH-14-1142018-Coordination Division
(In MW)
Coal Gas Diesel Total
End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472
End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634
End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537
End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596
End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921
End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703
End of 12th Plan 19216288 2532938 83763 21832988 6780 4447842 50018 31960630
Up to Oct-2018 19599250 2493722 837629 22176734 6780 4548742 7201281 34604757
Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-17) = 51529 MW
Electricity Generation (MU) Targets and Achievements for 2016-17
Coal Gas Diesel Nuclear Hydro Res Total
1959925 2493722 837629 678000 454874 72012805 22925174
29
1 Growth of Installed Capacity Since 6th Plan
Plan YearThermal
Nuclear Hydro RES (MNRE) Total
Total Installed Capacity 34604757 MW
Coal Gas Diesel Nuclear Hydro Res
File NoCEA-CH-14-1142018-Coordination Division
Progress of Transmission Sector in the Country up to Oct 2018
1 TRANSMISSION LINES (All fig in CKM)
At the end of
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
6th plan 0 0 0 0 0 0 0 0 0 0 0 0 1831 4198 0 6029 1641 44364 0 46005 3472 48562 0 52034
7th plan 0 0 0 0 0 0 0 0 0 0 0 0 13068 6756 0 19824 4560 55071 0 59631 17628 61827 0 79455
8th plan 0 0 0 0 1634 0 0 1634 0 0 0 0 23001 13141 0 36142 6564 73036 0 79600 31199 86177 0 117376
9th plan 0 0 0 0 3234 1504 0 4738 751 409 0 1160 29345 20033 0 49378 8687 88306 0 96993 42017 110252 0 152269
10th plan 0 0 0 0 4368 1504 0 5872 1775 409 0 2184 48708 24730 0 73438 9444 105185 0 114629 64295 131828 0 196123
11th Plan 0 0 0 0 5948 1504 1980 9432 4839 411 0 5250 71023 30191 5605 106819 10140 125010 830 135980 91950 157116 8415 257481
12th Plan 6124 0 0 6124 5948 1504 1980 9432 25465 1177 4598 31240 92482 48240 17065 157787 11014 151276 978 163268 141033 202197 24621 367851
13th Plan (Up
to Mar2018)6124 0 0 6124 5948 1504 1980 9432 28666 1512 4881 35059 98247 54286 19067 171600 11258 156497 1000 168755 150243 213799 26928 390970
13th Plan (Up
to Sep-18)6124 0 0 6124 5948 1504 1980 9432 30952 1512 5059 37523 99683 56069 20662 176414 11318 160958 1000 173276 154025 220043 28701 402769
27150
75050
47900
118050
90650
30
IR addition in 12th Plan (up to
March 2017)
Total IR (up to Oct-18)
IR at the end of 11th Plan
IR at the end of 12th Plan
Envisaged IR Capacity at the end
of 13th Plan
Grand Total
Note - The figure upto the end of 10th plan in for stringing progress including the lines not commissioned Now only commissioned lines are reckoned Accordingly the figure for 10th plan (end) may read as 187555 after adjusting with (-) 10852 Ckm
Inter-regional Power Transfer Capacity
plusmn 800 kV HVDC plusmn 500 kV HVDC 765 kV 400 kV 220 kV
File NoCEA-CH-14-1142018-Coordination Division
2004-05 27800
2005-06 28100
2006-07 30200
2007-08 33000
2008-09 35500
2009-10 36700
2010-11 38700
2011-12 41756
2012-13 45460
2013-14 48940
2014-15 53040
2015-16 54590
2016-17 57430
2017-18 60800
Year
2005-06
2006-07
2007-08
2008-09
2009-10
2010-11
2011-12
2012-13
2013-14
2014-15
2015-16
2016-17
2017-18
2004-05 254 209 7568
2005-06 260 221 7636
2006-07 276 227 7423
2007-08 293 239 7727
2008-09 340 263 8713
2009-10 355 268 8870
2010-11 398 303 11975
2011-12 455 330 13514
2012-13 501 376 14867
2013-14 518 175
2014-15 520
6719
7171
3 All India yearly Coal Consumption for Power Generation (Utilities)
YEARCoal Consumption
Million Tonnes
4 All India Annual per Capita consumption of Electricity Since 2006
Per Capita Consumption ( kWh)
6314
(GrossGen+ Net Import) Mid-year population
5 Average cost of power supply amp average realization ( paiseKWH )
Yearcost of supply
(paiseunit)
Realization(paiseunit)
Including AgricultureOnly
Agriculture
1149
7335
7786
91441
8188
88363
957
1010
1075
1122
File NoCEA-CH-14-1142018-Coordination Division
Source- PFC Reports on the performance of State Power Utilities 31
File NoCEA-CH-14-1142018-Coordination Division
Sl
NoExecuting Agency
Installed
Capacity (MW)Cost (Rs crore)
Date of
Clearance
32
No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification
since 2004-05
65291374575 296361511th Plan
Cumu upto End of 11th Plan
596556 21212860
557439Cummulative up to end of 12th Plan
46708
18423975
499150
2003-042004-05
5743
9769
Cumu upto End of 10th Plan
010407 to 310308
010410 to 310311557976840909
010411 to 310312
412667
86293726
3207
482864
12632
1576036
4451722594
15455554
2314176
397343611750
2093311060316074
65109527813884
6 Growth Of Rural Electrification amp Pumpsets Energisation
Plan Year
9th Plan2002-03
134092626
4111
Pump Sets Energised Villages Electricfied (Nos)
2001-02
284064367244
1218
27801997-981998-991999-002000-01
297594
010408 to 310309010409 to 310310
10th Plan
2005-062006-07
322968331020
Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as
Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received
from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made
available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified
villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is
independent of the earlier published reports
No Hydro Electric Project has been issued concurrenceAppraisal letter by CEA during October 2018
7 Status of Hydro Schemes Cleared by the CEA in Oct-2018
Name of Scheme
File NoCEA-CH-14-1142018-Coordination Division
SN Contents Page
1 Rate of sale of power for the year 2016-17 33-41
RATE OF SALE OF POWER FOR THE YEAR 2016-17
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) NORTHERN REGION
CENTRAL SECTOR
BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 18000 66900 19800
CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 54000 222400 21600
CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 30000 144400 19600
CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 23100 91700 42600
PARBATI - III HPS NHPC LTD HYDRO-HYDRO 52000 68200 54800
DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 28000 95600 30000
CHUTAK NHPC LTD HYDRO-HYDRO 4400 22000 79800
DULHASTI HPS NHPC LTD HYDRO-HYDRO 39000 228000 56400
SALAL HPS NHPC LTD HYDRO-HYDRO 69000 342300 11000
TANAKPUR HPS NHPC LTD HYDRO-HYDRO 9420 43000 29600
URI HPS -I NHPC LTD HYDRO-HYDRO 48000 280300 16000
URI HPS - II NHPC LTD HYDRO-HYDRO 24000 147300 48600
NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 4500 24600 88200
SEWA - II NHPC LTD HYDRO-HYDRO 12000 47100 43400
ANTA CCPP NTPC LTD THERMAL-GASN 41930 67539 32400
AURAIYA CCPP NTPC LTD THERMAL-GASN 66336 53501 39100
BADARPUR TPS NTPC LTD THERMAL-COAL 70500 159153 44800
DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 84000 296170 42300
DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 98000 526686 46300
DADRI CCPP NTPC LTD THERMAL-GASHSD 82978 227469 33000
FARIDABAD CCPP NTPC LTD THERMAL-GASN 43159 115577 30800
RIHAND STPS I NTPC LTD THERMAL-COAL 100000 596766 24500
RIHAND STPS II NTPC LTD THERMAL-COAL 100000 737069 24600
RIHAND STPS III NTPC LTD THERMAL-COAL 100000 706546 30600
SINGRAULI STPS NTPC LTD THERMAL-COAL 200000 1394068 20400
TANDA TPS NTPC LTD THERMAL-COAL 44000 295438 40800
UNCHAHAR TPS I NTPC LTD THERMAL-COAL 42000 256454 39800
UNCHAHAR TPS II NTPC LTD THERMAL-COAL 42000 273577 38900
UNCHAHAR TPS III NTPC LTD THERMAL-COAL 21000 142780 43000
KOLDAM NTPC LTD HYDRO-HYDRO 80000 363260 43600
NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 303575 25841
RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 108000 668677 35374
NJHPS SJVNL HYDRO-HYDRO 150000 699496 23820
RAMPUR HPS SJVNL HYDRO-HYDRO 41202 195982 32260
TEHRI HPP THDC HYDRO-HYDRO 100000 272543 51800
KOTESHWAR HEP THDC HYDRO-HYDRO 40000 106244 53400
IGSTPS JHAJJAR ARAVALI P CPL THERMAL-COAL 150000 510429 49490
NEYVELI BARSINGSAR NEYVELI LIG CORP LTD THERMAL-LIG 25000 127520 38040
STATE SECTOR
PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 21000 14222 48200
PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 21000 19205 48400
PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 25000 102257 42600
PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 25000 62107 41800
DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 60000 312213 41000
RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 120000 35767442200
WYC HYDEL STATION HPGCL HYDRO-HYDRO 6240 20365 24900
GIRI POWER HOUSE HPSEB HYDRO-HYDRO 6000 13958 7600
ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 1695 5467 11900
BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 12000 18528 6700
GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 2250 7462 22500
BASSI POWER HOUSE HPSEB HYDRO-HYDRO 6600 29649 7500
BINWA POWER HOUSE HPSEB HYDRO-HYDRO 600 2749 19300
ANNEXURE-I
RATE OF SALE OF POWER FOR THE YEAR 2016-2017
Page 33
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) GAJ POWER HOUSE HPSEB HYDRO-HYDRO 1050 2914 26700
BANER POWER HOUSE HPSEB HYDRO-HYDRO 1200 2864 16200
HOLI POWER HOUSE HPSEB HYDRO-HYDRO 300 616 22500
THIROT POWER HOUSE HPSEB HYDRO-HYDRO 450 1126 22500
KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 1200 3064 22500
LARJI POWER HOUSE HPSEB HYDRO-HYDRO 12600 53677 23700
NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 250 750 31000
CHABA POWER HOUSE HPSEB HYDRO-HYDRO 175 465 23300
RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 150 101 13400
SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 200 000 22500
KILLAR HPSEB HYDRO-HYDRO 030 050 22500
BHABA AUGUMENP H HPSEB HYDRO-HYDRO 450 1276 22500
BS CHAMBA HPSEB HYDRO-HYDRO 045 099 19500
GUMMA HPSEB HYDRO-HYDRO 300 423 22500
GAS TURBINE POWER STATION IPGCL THERMAL-GAS 27000 67233 39300
PPS-I PPCL THERMAL-GAS 33000 175905 38300
PPS-III PPCL THERMAL-GAS 137120 196879 36100
LOWER JHELUM JampKPDD HYDRO-HYDRO 10500 60214 5100
UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 2260 10514 6300
UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 10500 44202 8500
GANDHARBAL JampKPDD HYDRO-HYDRO 1500 8925 4700
KARNAH MPH JampKPDD HYDRO-HYDRO 200 1122 31000
CHENANI I JampKPDD HYDRO-HYDRO 2330 10892 6600
CHENANI II JampKPDD HYDRO-HYDRO 200 1188 9300
CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 750 3634 14200
IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 375 2108 18500
IGO MERCHELLONG JampKPDD HYDRO-HYDRO 300 1572 29700
PAHALGAM MHP JampKPDD HYDRO-HYDRO 450 1713 32900
MARPACHOO JampKPDD HYDRO-HYDRO 075 375 29800
HAFTAL JampKPDD HYDRO-HYDRO 100 483 28700
SANJAK JampKPDD HYDRO-HYDRO 126 441 36000
SEWA-III JampKPDD HYDRO-HYDRO 900 3273 20200
BHADERWAH JampKPDD HYDRO-HYDRO 150 935 8900
BAZGO JampKPDD HYDRO-HYDRO 030 108 33300
SUMOOR JampKPDD HYDRO-HYDRO 010 045 35400
HUNDER JampKPDD HYDRO-HYDRO 040 176 26200
STAKNA JampKPDD HYDRO-HYDRO 400 1933 4100
KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 124000 662879 31360
SURATGARH TPS RRVUNL THERMAL-COAL 150000 402328 41730
CHHABRA TPS 1amp 2 RRVUNL THERMAL-COAL 50000 305946 36700
CHHABRA TPS 3 RRVUNL THERMAL-COAL 25000 151536 36700
CHHABRA TPS 4 RRVUNL THERMAL-COAL 25000 155896 36700
RAMGARH GT POWER PROJECT RRVUNL THERMAL-COAL 22050 43177 41800
RAMGARH GAS T P PROJECT 3 RRVUNL THERMAL-GAS 5000 93615 41800
DHOLPUR C C POWER PROJECT RRVUNL THERMAL-R-LNG 33000 9486 46110
MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 14000 20855 34192
MINI MICRO HYDEL (MMH) P S RRVUNL HYDRO-HYDRO 2385 851 37800
KALISINDH TPP 1 RRVUNL THERMAL-COAL 60000 341543 45000
KALISINDH TPP 2 RRVUNL THERMAL-COAL 60000 211588 45000
KHARA HEP UPJVNL HYDRO-HYDRO 7200 26654 7200
MATATILLA HEP UPJVNL HYDRO-HYDRO 3060 12219 6500
OBRA HEP UPJVNL HYDRO-HYDRO 9900 21517 6300
RIHAND UPJVNL HYDRO-HYDRO 30000 57369 5500
ANPARA A TPS UPRVUNL THERMAL-COAL 63000 317536 27000
ANPARA B TPS UPRVUNL THERMAL-COAL 100000 705605 22700
ANPARA D UPRVUNL THERMAL-COAL 100000 300158 39800
HARDUAGANJ TPS UPRVUNL THERMAL-COAL 16500 45817 49200
HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 50000 304389 46600
OBRA A TPS UPRVUNL THERMAL-COAL 28800 13158 34000
OBRA B TPS UPRVUNL THERMAL-COAL 100000 328124 21900
Page 34
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) PANKI TPS UPRVUNL THERMAL-COAL 21000 66488 50300
PARICHHA TPS UPRVUNL THERMAL-COAL 22000 38762 49400
PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 42000 231931 45600
PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 50000 276722 50400
CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 24000 70845 8290
CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 14400 75366 8390
DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 3375 9595 12080
DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 5100 18701 10520
KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4140 17359 12330
KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 12000 33001 9420
KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 3000 11953 8320
TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 9000 33983 12460
MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 30400 124510 16110
RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 19800 17897 10550
MPUR UTTARAKHAND JVNL HYDRO-HYDRO 930 5121 19200
PATHRI UTTARAKHAND JVNL HYDRO-HYDRO 2040 11636 14200
GALOGI UTTARAKHAND JVNL HYDRO-HYDRO 300 648 12500
PRIVATE SECTOR
MGTPP CLP INDIA PVT LTD THERMAL-COAL 132000 268902 41940
SHRINAGAR HEP ALAKNANDA HPCL HYDRO-HYDRO 33000 127414 48800
GAMA INFRAPROP CCPP GAMA INFRAPROP PVT THERMAL-GAS 22500 52686 47000
PPGCL (BARA) JP POWER VENTURES LTD THERMAL-COAL 198000 448200 38500
MALANA HEP MALANA PCL HYDRO-HYDRO 8600 26354 29792
MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 10000 30369 32580
ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 19200 56347 36079
KASHANG HEP H P PCL HYDRO-HYDRO 19500 5034 29200
BASPA-II HEP HBPCL HYDRO-HYDRO 30000 132769 13600
KARCHAM WANGTOO HEP HBPCL HYDRO-HYDRO 100000 434386 36600
RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 108000 582600 43700
RITHALA COMBI CY POWER PLANT TATA POWER DDL THERMAL-GAS 9480 000 11900
RAJPURA TPS NABHA POWER LTD THERMAL-GAS 140000 901484 39000
TALWANDI SABO POWER LTD TALWANDI SABO POWER LTD THERMAL-COAL 198000 636040 49548
ROJA THERMAL POWER STATION ROJA POWER SCL THERMAL-COAL 120000 727200 43400
KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 34400 63400
BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 36000 62600
MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 38200 60800
UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 37900 61500
KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 42300 58800
LALITPUR PGCL BAJAJ ENERGY PVT LTD THERMAL-COAL 198000 359400 47300
PRAYAGRAJ PGCL PRAYAGRAJ PGCL THERMAL-COAL 132000 448200 38595
KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 132000 783182 33438
WESTERN REGION
CENTRAL SECTOR
INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 100000 325333 23892
OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 52000 141663 34001
GANDHAR CCPP NTPC LTD THERMAL-GAS 65739 221924 28700
KAWAS CCPP NTPC LTD THERMAL-GASN 65620 167929 27000
KORBA I amp II NTPC LTD THERMAL-COAL 210000 1499171 20500
KORBA III NTPC LTD THERMAL-COAL 50000 358746 26600
SIPAT STPS I NTPC LTD THERMAL-COAL 198000 1479902 26800
SIPAT STPS II NTPC LTD THERMAL-COAL 100000 766549 26500
VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 126000 693142 25800
VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 100000 608781 23800
VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 100000 673475 27600
VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 100000 655924 32900
VINDHYACHAL STPS V NTPC LTD THERMAL-COAL 50000 328265 31700
MOUDA I NTPC LTD THERMAL-COAL 100000 343130 44500
MOUDA Ii NTPC LTD THERMAL-COAL 66000 40637 39900
RATNAGIRI GAS amp POWER PVT LTD RGPPL THERMAL-GAS 196708 442485 47000
KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 000 24729
TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 32000 201227 10740
Page 35
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 365122 19069
TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 787444 29324
STATE SECTOR
GSEG-HAZIRA15610 MW GUJARAT S ENEGEN LTD THERMAL-GAS 15610 1805 28200
GSEG-HAZIRA35143 MW GUJARAT S ENEGEN LTD THERMAL-GAS 35130 22276 51300
GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 21978 51800
AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 13929 26100
KORBA TPS EAST CSPGCL THERMAL-COAL 44000 198673 33880
DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 365808 27570
KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 316500 30420
HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 532878 19410
CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 515 58300
MTTPS CHAMPA U-I CSPGCL THERMAL-COAL 50000 220376 39000
MTTPS CHAMPA U-II CSPGCL THERMAL-COAL 50000 23709 10000
SHP GANGREL CSPGCL HYDRO-HYDRO 1000 2350 36790
BANGO HEP CSPGCL HYDRO-HYDRO 12000 14662 8900
MHP KORBA WEST CSPGCL HYDRO-HYDRO 170 859 38190
SIKASAR HEP CSPGCL HYDRO-HYDRO 700 418 26870
DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8843 74500
DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 19446 51500
GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 66388 71600
GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127488 41300
KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 96072 43900
KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 29841 56400
SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 184966 58800
UKAI 1-5 GSECL THERMAL-COAL 85000 204891 46900
UKAI TPS 6 GSECL THERMAL-COAL 50000 284448 48200
WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 271999 58300
WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 82808 44100
KADANA HPS GSECL HYDRO-HYDRO 24200 34433 16800
UKAI HPS GSECL HYDRO-HYDRO 30500 40585 6100
TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 123000 11500
BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 8900 10900
BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 7200 27500
JHINNA HPS MPPGCL HYDRO-HYDRO 2000 9700 18500
RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 44300 3400
GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 17300 4600
SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 4100 16900
MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 14600 27000
PENCH HPS MPPGCL HYDRO-HYDRO 16000 23700 8100
RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 3000 16900
AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 134400 35100
SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 283800 38700
SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 344600 34300
SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 111600 61600
SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 211800 58000
SSTPS PH-I MPPGCL THERMAL-COAL 120000 233100 84300
BHUSAWAL TPS MSPGCL THERMAL-COAL 142000 566258 51100
CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1365682 33700
KHAPERKHEDA MSPGCL THERMAL-COAL 134000 706207 39100
KORADI TPS MSPGCL THERMAL-COAL 62000 443206 42000
NASIK TPS MSPGCL THERMAL-COAL 63000 297275 47000
PARLI TPS MSPGCL THERMAL-COAL 113000 175934 71600
PARAS MSPGCL THERMAL-COAL 50000 267931 38700
URAN CCPP MSPGCL THERMAL-GAS 67200 320330 30600
KOYANA MSPGCL HYDRO-HYDRO 195600 328155 13100
SMALL HYDRO POWER PLANTS MSPGCL HYDRO-HYDRO 45400 93062 30500
BHIRA MSPGCL HYDRO-HYDRO 8000 10046 8400
TILLARI MSPGCL HYDRO-HYDRO 8900 10584 3100
SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 233298 20500
SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 87633 20500
PRIVATE SECTOR
Page 36
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 81282 46750
JNSTPP(JAYPEE NIGRIE) JP POWER VENTURES LTD THERMAL-COAL 132000 726695 29310
MB POWER MB POWER THERMAL-COAL 120000 345632 38310
ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 754922 28671
ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 780761 23495
ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 198000 1263784 32090
ADANI POWER MAHARA ADANI POWER LTD THERMAL-COAL 330000 1666191 34124
AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 170065 36827
SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 252035 45129
ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 458551 36000
ESSAR POWER MP LTD ESSAR POWER MP LTD THERMAL-COAL 60000 243040 28600
VEDANTA LTD (P P -I) VEDANTA LTD THERMAL-GAS 3000 15044 24000
VEDANTA LTD (P P -II) VEDANTA LTD THERMAL-GAS 3000 21293 24000
PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 8234600 24000
165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 5850 64390
145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 68717 40349
SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 132655 28776
SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 144686 38567
MUNDRA UMPPCOASTAL GUJARAT POWER
LTD THERMAL-IMP COAL 400000 2530300
23900
LANCO AMARKANTAK TPP PATHADIH
U-ILANCO AMARKAN POWER LTD THERMAL-COAL 30000 195500
29200
LANCO AMARKANTAK TPP PATHADIH
U-IILANCO AMARKAN POWER LTD THERMAL-COAL 30000 206900
27600
BARADARHA TPS D B POWER LTD THERMAL-COAL 120000 677373 29200
JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 405000 28900
JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 453000 40500
DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 339437 40700
TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 293400 44000
TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 137200 37000
TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 174900 44000
BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 92900 14100
BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23700 34300
KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 27600 48300
CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2530300 23900
BHANDARDRA HEP -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 2475 54900
SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 161400 26500
SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 445000 39000
SOTHERN REGION
CENTRAL SECTOR
NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 325699 54820
NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 305532 39880
NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 998805 38510
NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 113016 54070
NEYVELI TAMILNADU POWER LTD JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 625274 42200
VALLUR TPS NTPC TECL THERMAL-COAL 150000 856438 42350
R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 1493 84300
RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1502919 29400
RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 341291 31800
SIMHADRI I NTPC LTD THERMAL-COAL 100000 688382 36800
SIMHADRI II NTPC LTD THERMAL-COAL 100000 663657 43400
KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 593110 31324
MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 291625 21764
KKNPP-1 amp 2 NPCIL NUCLEAR-NUCLEAR 200000 572609 40948
MINICOY LAKSHADEEP THERMAL-DIESEL 340 770 29600
KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1097 29600
AMINI LAKSHADEEP THERMAL-DIESEL 265 509 29600
ANDROTT LAKSHADEEP THERMAL-DIESEL 219 524 29600
KALPENI LAKSHADEEP THERMAL-DIESEL 175 356 29600
AGATTI LAKSHADEEP THERMAL-DIESEL 195 658 29600
KADMAT LAKSHADEEP THERMAL-DIESEL 190 414 29600
KILTAN LAKSHADEEP THERMAL-DIESEL 150 269 29600
CHETLET LAKSHADEEP THERMAL-DIESEL 100 139 29600
BITRA LAKSHADEEP THERMAL-DIESEL 043 024 29600
BANGARAM LAKSHADEEP THERMAL-DIESEL 018 009 29600
Page 37
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) STATE SECTOR
Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 721811 46500
Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 50000 336142 46500
RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 237358 46500
RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 239926 46500
RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 124500 46500
SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 62109 46500
UPPER SILERU APGENCO HYDRO-HYDRO 24000 33000 46500
LOWER SILERU APGENCO HYDRO-HYDRO 46000 81066 46500
DONKARAI APGENCO HYDRO-HYDRO 2500 6007 46500
PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 1262 46500
CHETTIPETA APGENCO HYDRO-HYDRO 100 214 46500
MUCHKUND APGENCO HYDRO-HYDRO 12000 37571 46500
NAGARJUNASAGAR RCPH APGENCO HYDRO-HYDRO 9000 606 46500
TUNGABHADRA HES amp HAMPI(AP
Share)
APGENCO HYDRO-HYDRO 7200 6100 46500
KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 352232 42600
KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 288131 32500
KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 319272 46500
RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 40073 44300
KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 308317 46000
KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 308963 51300
SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 61004 76600
NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 17960 75300
PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 20873 58300
POCHAMPAD-I TSPGENCO HYDRO-HYDRO 2700 5455 29800
POCHAMPAD-II TSPGENCO HYDRO-HYDRO 900 1932 40700
NIZAMSAGAR TSPGENCO HYDRO-HYDRO 1000 1126 53400
RAICHUR TPS 1 to 7 KPCL THERMAL-COAL 147000 890866 43800
RAICHUR TPS 8 KPCL THERMAL-COAL 25000 159523 48200
BELLARI TPS 1 KPCL THERMAL-COAL 50000 318679 51100
BELLARI TPS 2 KPCL THERMAL-COAL 50000 232347 55600
BELLARI TPS 3 KPCL THERMAL-COAL 70000 47565 34400
BHADRA PH KPCL HYDRO-HYDRO 3920 2369 45900
GERUSUPPA PH KPCL HYDRO-HYDRO 24000 26990 22000
GHAT PRABHA HEP KPCL HYDRO-HYDRO 3200 4777 25300
KADRA HPS KPCL HYDRO-HYDRO 15000 16889 26800
NAGJHARI KPCL HYDRO-HYDRO 90000 155159 9800
KODASALLI DPH KPCL HYDRO-HYDRO 12000 14854 19200
MUNIRA+MGH+SPH+SPH KPCL HYDRO-HYDRO 22640 48211 7900
SHARAVATHY HPS KPCL HYDRO-HYDRO 108550 276215 5400
ALMATTI DPH KPCL HYDRO-HYDRO 29000 39611 24600
VARAHI UGPH KPCL HYDRO-HYDRO 46000 71368 15600
IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 17196 15300
IDUKKI HPS KSEB HYDRO-HYDRO 78000 137905 15300
KAKKAD HPS KSEB HYDRO-HYDRO 5000 13063 15300
KALLADA HPS KSEB HYDRO-HYDRO 1500 4436 15300
KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 46544 15300
KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 635 15300
LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 30822 15300
MALANKARA HPS KSEB HYDRO-HYDRO 1050 2474 15300
MATTUPETTY KSEB HYDRO-HYDRO 200 230 15300
MALAMPUZHA KSEB HYDRO-HYDRO 250 063 15300
CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 864 15300
URUMI ST I amp II KSEB HYDRO-HYDRO 615 903 15300
LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 248 15300
NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7765 19625 15300
PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 16601 15300
PANNIAR HPS KSEB HYDRO-HYDRO 3240 6217 15300
PORINGALKUTHU KSEB HYDRO-HYDRO 3600 10052 15300
PORINGALKUTHU LBE KSEB HYDRO-HYDRO 1600 9438 15300
PEPPARA KSEB HYDRO-HYDRO 300 395 15300
POOZHITHODE KSEB HYDRO-HYDRO 480 1045 15300
Page 38
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) PEECHI KSEB HYDRO-HYDRO 125 040 15300
RANI-PERUNADU KSEB HYDRO-HYDRO 400 585 15300
SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 79783 15300
SENGULAM HPS KSEB HYDRO-HYDRO 5120 11558 15300
SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 16711 15300
VILANGAD KSEB HYDRO-HYDRO 750 1578 15300
BARAPOLE KSEB HYDRO-HYDRO 1500 1932 15300
VELLATHOOVAL KSEB HYDRO-HYDRO 360 305 15300
CHIM0NY KSEB HYDRO-HYDRO 250 156 15300
ADYANPARA KSEB HYDRO-HYDRO 350 501 15300
BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 554 15300
KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 3801 15300
KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 23132 32800
ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 14416 62280
METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 523970 62280
METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 321270 62280
NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 336575 62280
NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 591240 62280
TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 508966 62280
KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 30897 62280
VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 18720 90699 62280
KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 33593 62280
BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 1047 62280
PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 1250 62280
PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 330 62280
MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 4897 62280
MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 032 62280
KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15681 62280
KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 40608 62280
KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 21342 62280
KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 4717 62280
KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4322 62280
KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2399 62280
METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 4416 62280
METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 8035 62280
BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2187 62280
BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2359 62280
BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2511 62280
BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 1949 62280
BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 1819 62280
POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 172 62280
SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 241 62280
MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 026 62280
THIRUMOORTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 136 62280
PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 9309 62280
VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 353 62280
SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 4192 62280
PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 6571 62280
SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 1186 62280
SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6319 62280
ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 6122 62280
KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 28674 62280
SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 18381 62280
SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 4258 62280
KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 12680 62280
KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4201 62280
ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 000 62280
PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 19175 62280
AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 078 62280
BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 504 62280
BHAVANI KATTALAI (BKB)(IIIampIII BB I amp II)TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 5847 62280
PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 000 62280
Page 39
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) SRI DAMODARAM STPS APPDCL THERMAL-COAL 160000 808108 36300
PRIVATE SECTOR
KARUPPUR TANJORE LANCO TANJORE PCL THERMAL-GAS 12000 48096 28770
SIMHAPURI ENERGY LTD SIMHAPURI ENERGY LTD THERMAL-COAL 60000 143900 39100
JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 7111 45500
SBU 1 JSW ENERGY LTD
VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 26000 159100
43300
SBU 2 JSW ENERGY LTD
VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 60000 247900
42800
LANCO KPLLANCO KONDAPALLI POWER
LTDTHERMAL-GAS 36814 85060
25776
LANCO KPL STG -IILANCO KONDAPALLI POWER
LTDTHERMAL-GAS 36600 12979
46330
LANCO KPL STG -IIIALANCO KONDAPALLI POWER
LTDTHERMAL-GAS 37100 85710
46330
LANCO KPL STG -III BLANCO KONDAPALLI POWER
LTDTHERMAL-GAS 37100 43639
46330
HINDUJA NATIONAL PCL HINDUJA NATIONAL PCL THERMAL-COAL 104000 303000 38200
MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 121164 49940
UDUPI POWER COR LTD ADANI POWER LTD THERMAL-COAL 120000 754613 42500
SPECTRUM POWER GENERATION
LTD SPECTRUM PG LTD THERMAL-GASN 20525 9256812
34952
TAQA NEYVELI POWER COM PVT
LTD TAQA NEYVELI THERMAL-LIG 25000 5840
34500
ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 251000 51000
ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 207860 36800
GMR VEMAGIRI POWER GENERATION
LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 30117
46450
EASTERN REGION
CENTRAL SECTOR
MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 64675 53113
MTPS STAGE - II KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 39000 1432 69138
BOKARO `B` TPS DVC THERMAL-COAL 63000 145670 31539
MEJIA TPS U 1-3 DVC THERMAL-COAL 63000 348298 31552
MEJIA TPS U 4 DVC THERMAL-COAL 21000 116099 34997
MEJIA TPS U 5-6 DVC THERMAL-COAL 50000 276427 35976
MEJIA TPS U 7-8 DVC THERMAL-COAL 100000 552854 36991
DURGAPUR STEEL TPS DVC THERMAL-COAL 100000 665550 39323
DURGAPUR TPS DVC THERMAL-COAL 21000 59270 35416
RAGHUNATHPUR TPS DVC THERMAL-COAL 120000 201650 35326
MAITHON HYDEL STA DVC HYDRO-HYDRO 6320 12200 17984
CHANDRAPURA TPSU1-3 DVC THERMAL-COAL 42000 257610 35095
CHANDRAPURA TPSU7-8 DVC THERMAL-COAL 50000 306673 34987
KODERMA TPS DVC THERMAL-COAL 100000 380180 38131
PANCHET HPS DVC HYDRO-HYDRO 8000 13360 17984
TILLAYA HPS DVC HYDRO-HYDRO 400 1410 17984
RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34700 35400
TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 277300 23200
TLDP -III NHPC LTD HYDRO-HYDRO 13200 55400 62000
TLDP -IV NHPC LTD HYDRO-HYDRO 16000 60300 25600
FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 957219 33700
FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 308943 41000
BONGAINGAON TPS NTPC LTD THERMAL-COAL 25000 153663 58600
KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 542277 34200
KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 942591 34200
BARH-II NTPC LTD THERMAL-COAL 132000 728021 44500
TALCHER TPS NTPC LTD THERMAL-COAL 46000 335521 30100
TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 702319 25600
TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1436521 24700
STATE SECTOR
BTPS(RampM) BIHAR STATE PGCL THERMAL-COAL 22000 12142 39700
BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 98331 10602
HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 50593 9482
CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 19689 2605
RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 53192 6033
UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 147208 14637
Page 40
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 60353 4519
IB TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 288567 25000
J P H GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 210 038 61100
MEYONG CHU GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 400 1086 61100
TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 122667 38200
DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 214339 43321
KOLAGHAT THERMAL POWER
STATION
WEST BENGAL PDCL THERMAL-COAL 126000 538269 31603
BAKRESHWAR THERMAL POWER
PLANT
WEST BENGAL PDCL THERMAL-COAL 105000 634876 32154
BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 45000 166855 33299
SANTHALDIH THERMAL POWER
STATION
WEST BENGAL PDCL THERMAL-COAL 50000 336442 34932
SAGARDIGHI THERMAL POWER
PROJECT
WEST BENGAL PDCL THERMAL-COAL 160000 423121 34705
JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 20344 68900
RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 24559 68900
TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 4623 68900
PURULIA PUMPED STORAGE
PROJECT
WEST BENGAL SEDCL HYDRO-HYDRO 90000 108816 68900
MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2768 68900
PRIVATE SECTOR
CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 49474 20230
CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 555500 70200
HALDIA ENERGY HALDIA ENERGY LTD THERMAL-COAL 60000 371000 50400
DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3688 63400
KAMALANGA TPS GMR KAMALANGA ENERGY LTD THERMAL-COAL 105000547670
33300
ADHUNIK POWER U-1 ADHUNIK POWER THERMAL-COAL 27000 158 44060
ADHUNIK POWER U-2 ADHUNIK POWER THERMAL-COAL 27000 168 44250
VL-JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 332800 23622
JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 43000 45250
JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 71700 37030
JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 70700 35920
JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 71100 38870
JOJOBERA UNIT 5 TATA POWER COM LTD THERMAL-COAL 12000 79300 44560
JOJOBERA UNIT 6 TATA POWER COM LTD THERMAL-WHR 12000 83700 12840
IEL KALINGANAGAR U-I TATA POWER COM LTD THERMAL-WG 6750 33400 22500
IEL KALINGANAGAR U-II TATA POWER COM LTD THERMAL-WG 6750 34800 22500
MAITHON UNIT 1 amp 2 TATA POWER COM LTD THERMAL-COAL 105000 678000 36100
HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 27500 24340
HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 28400 24340
HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 15800 24310
NORTH EASTERN REGION
CENTRAL SECTOR
LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 74100 36600
AGARTALA GT NEEPCO THERMAL-GAS 13500 88611 27210
ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 153111 32310
DOYANG HEP NEEPCO HYDRO-HYDRO 7500 25598 49801
KOPILI HEP NEEPCO HYDRO-HYDRO 20000 98186 11491
KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 19582 20237
KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 10310 17968
RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 124093 22945
TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 10100 17344 39000
STATE SECTOR
HYDRO POWER (122 Stns) ITANAGAR GOVT OF ARUNACHAL
PRADESHHYDRO-HYDRO 6971 6217270
24600
KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39514 17337
LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 82327 36810
NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 33318 48290
MYNTRIANG SHEP ST II ASSAM POWER GENCO HYDRO-HYDRO 300 567 35776
LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 9130 49200
LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 012 49200
DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 022 49200
TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 000 49200
UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 4990 16000
UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 6476 37000
UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 16494 14600
UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 3600 9556 15000
SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 758 8000
MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44070 44800
KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 154 41400
TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 091 41400
MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 411 41400
MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 394 41400
KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 760 41400
SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 3264 41400
LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 044 41400
BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 18953 28000
ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 43585 28200
GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 4080 11100
Note
LIG Lignite N Naptha WHR Waste Heat Recovery
Page 41
File NoCEA-CH-14-1142018-Coordination Division
Voltage Level
+- 800 KV HVDC
+- 500 KV HVDC
765 KV
400 KV
220 KV
All India
Voltage Level
+- 800 KV HVDC
+- 500 KV HVDC
765 KV
400 KV
220 KV
All India
6
7 Transformation Capacity Addition During Oct-2018 (MVA)
0
0
2575
1025
0 0
Oct-17 Oct-18
3600
0
3000
9840
4620
2220
3000 0
All India Transformation Capacity Addition during April 2017- Oct 2017 amp April
2018- Oct 2018 (MVA)
41790
0
14000
17180
10610
45665
10000
23020
9645
0
April 2017- Oct 2017 April 2018- Oct 2018
3600
9840
0
2000
4000
6000
8000
10000
12000
MV
A
Oct-17 Oct-18
4566541790
0
74520
1
MV
A
April 2017- Oct 2017 April 2018- Oct 2018
File NoCEA-CH-14-1142018-Coordination Division
Oct-2017 Oct-2018 Oct-2017 Oct-2018 Oct-2017 Oct-2018
Northern 31786 31822 31096 31375 -22 -14
Western 31728 36308 31628 36178 -03 -04
Southern 24314 29392 24271 29342 -02 -02
Eastern 12012 12547 11931 12507 -07 -03
North Eastern 1487 1387 1451 1351 -24 -25
All India 101327 111455 100377 110753 -09 -06
Oct-2017 Oct-2018 Oct-2017 Oct-2018 Oct-2017 Oct-2018
Northern 51307 50659 50289 49635 -20 -20
Western 48530 56548 46392 55695 -44 -15
Southern 39142 45279 38905 45226 -06 -01
Eastern 19850 22959 19836 22567 -01 -17
North Eastern 2596 2790 2499 2700 -37 -32
All India 162027 172945 157394 170604 -29 -14
Oct-2018 Figures are Provisional
7
8 Power Supply Position (Energy amp Peak) in Oct-2018
Peak Demand Peak Met
Requirement Availability
Energy (MU)Region
Surplus(+)
Deficit (-) in
Surplus(+)
Deficit (-) in Region
Power (MW)
File NoCEA-CH-14-1142018-Coordination Division
Chandigarh Delhi Haryana HP JampK Punjab Rajasthan UP Utrakhand Oct-2017 0 0 0 0 516 0 0 0 0
Oct-2018 0 0 0 0 567 0 0 688 0
Chattisgarh Gujarat MP Maharastra Daman amp Diu Dadar Nagar Goa
Oct-2017 16 0 13 2062 0 0 25
Oct-2018 146 19 39 705 1 4 0
AP Telangana Karnataka Kerala Tamil Nadu Puducherry Lakshadweep
Oct-2017 18 19 0 211 38 2 0
Oct-2018 0 0 0 83 414 1 0
8
9 Peak Shortage of Power Supply (MW) in Different Regions in Oct-2018
0 0 0 0
567
0 0
688
00 0 0 0
516
0 0 0 0
0
400
800
Chan
dig
ar
h
Delh
i
Hary
ana
HP
Jamp
K
Pu
nj
ab
Raja
sth
an
UP
Utr
ak
hand
MW
Northern States (MW) Oct-2018 Oct-2017
146
19
39 705
1 4 016
0 13
2062
0 0 25
0
5000
Ch
attis
garh
Guja
rat
MP
Mah
ara
st
ra
Da
man amp
Diu
Da
dar
Na
gar G
oaM
W
Western States (MW) Oct-2018 Oct-2017
0 0 083
414
1 018 19 0
211
38 2 00
500
AP Telangana Karnataka Kerala Tamil Nadu Puducherry Lakshadweep
Southern State (MW) Oct-2018 Oct-2017
File NoCEA-CH-14-1142018-Coordination Division
Bihar DVC Jharkhand Odisha West Bengal Sikkim AampN Island
Oct-2017 6 0 0 0 8 0 4
Oct-2018 0 0 0 400 0 0 4
Arunachal Assam Manipur Meghalaya Mizoram Nagaland Tripura
Oct-2017 6 77 4 0 2 2 12
Oct-2018 13 81 2 0 2 3 0
9
0 0 0
400
0 0 46 0 0 0 8 0 4
0100200300400500
Bih
ar
DV
C
Jha
rkh
an
d
Od
ish
a
We
st
Be
ng
al
Sik
kim
Aamp
NIs
land
MW
Eastern States (MW) Oct-2018 Oct-2017
13
81
2 0 2 3 06 4 0 2 2
12
0
100
Aru
na
ch
al
Assa
m
Ma
nip
ur
Meghal
aya
Miz
ora
m
Na
gala
nd
Trip
ura
MW
North-Eastern States (MW)
File NoCEA-CH-14-1142018-Coordination Division
Sector Oct-2017 Oct-2018
Central 6872 7355
State 5217 6078
Private 6045 6819
ALL INDIA 5882 6524
Month PLF 2017 PLF 2018
Jan 6014 6288
Feb 6153 6285
March 6313 6558
April 6493 6458
May 6355 6554
June 5672 5917
July 537 5545
Aug 5733 5639
Sep 5989 6109
Oct 5882 6524
For Coal and Lignite based Power Plants and Provisional based on Actual-Cum-Assesment
10
PLF of Thermal Power Plants
All India PLF of Thermal Plants (Excluding Gas Based Plants) Month-wise
10 All India PLF Sector-wise for Oct-2018
68
72
52
17
60
45
58
8273
55
60
78
68
19
65
24
000
1000
2000
3000
4000
5000
6000
7000
8000
Central State Private ALL INDIA
P
LF
Oct-2017 Oct-2018
0
10
20
30
40
50
60
70
Jan Feb March April May June July Aug Sep Oct
Months
All India PLF Month-wise
PLF 2017 PLF 2018
File NoCEA-CH-14-1142018-Coordination Division
2012-13 2013-14 2014-15 2015-16 2016-17
TampD Losses 2304 2284 2277 2181 2142
ATampC Losses 2548 2258 2462
Note As per PFC for utilities selling directly to consumers
Total Number of Villages
597464
Note From the year 2004-05 onwards Definition of Village Electrification-
A village would be declared Electrified if
Without
Subsidy
Gap ACS-
ARR(
Without
Subsidy)
Paiseunit
Gap ACS-
ARR (on
subsidy
booked
basis)
paiseunit
Gap ACS-
ARR (on
subsidyrece
ived basis)
paiseunit
2013-14 400 118 76 77
2014-15 412 108 58 60
Source- PFC Reports on the performance of State Power Utilities
2013-14 4894
2014-15 5304
2015-16 5459
2016-17 5743
2017-18 6080
11
Average cost of supply(ACS)
(paiseunit)
i) Basic Infrastructure such as Distribution Transformer and Distribution lines are provided in the inhabited locality
as well as Dalit Basti hemlet where it exists (For electrification through Non-Conventional Energy Sources a
Distribution Transformer may not be necessary)
14 All India Coal consumption for Power Generation (MT)
520
Average Revenue Realization(paiseunit)
518
Year
ii) Electricity is provided to Public places like Schools Panchayat Office Health Centre Dispensaries Community
Centres etc and
iv) Mandatory Certification from Gram Panchayat regarding the completion of village electrification should be
obtained
13 Average cost of Power amp Average Realisation
iii) The number of households electrified should be at least 10 of the total number of households in the village
11 T amp D and ATampC Losses ()
12 All India Village Electrification
Villiages Electrified (Nos)
10000All villages as per census 2011 has
been electrified on 28042018
Villages electrified
File NoCEA-CH-14-1142018-Coordination Division
SN Contents Page
1 Capacity Addition Targets and Achievements in 12th Plan 12
2 Capacity Addition Targets amp Achievements during Oct-2018 and April 2018- Oct 2018 13
3 Installed Capacity in various Regions including their shares 14-19
Section B - Capacity Addition
File NoCEA-CH-14-1142018-Coordination Division
Figures in MW
TARGET ACH TARGET ACH TARGET ACH TARGET ACH
CENTRAL 14878 15869 6004 2584 5300 2000 26182 20453
STATE 13922 22201 1608 2276 0 0 15530 24477
PRIVATE 43540 53661 3285 619 0 0 46825 54280
ALL INDIA 72340 91730 10897 5479 5300 2000 88537 99209
Figures in MW
Thermal Hydro Nuclear Total
Target Ach Target Ach Target Ach Target Ach
Central 4880 3170 800 390 500 6180 3560 5761
State 3546 1760 300 200 0 3846 1960 5096
Private 2940 3780 205 205 0 3145 3985 12671
Total 11366 8710 1305 795 500 0 13171 9505 7217
12
2 CAPACITY ADDITION TARGET AND ACHIEVEMENT FOR 2017-18 (IN MW)
1 Capacity Addtion Targets and Achievements in the 12th Plan
SECTORTHERMAL HYDRO NUCLEAR TOTAL
File NoCEA-CH-14-1142018-Coordination Division
(MW)
Cummulative
Deviation
Target Achievement Target Achievement (+) (-)
Central 2760 250 0 250 0 -250
State 450615 1030 0 1030 69755 -960245
Private 0 0 600 0 600 600
Total 726615 1280 600 1280 669755 -610245
Central 710 0 0 110 110 0
State 130 0 0 12999 30 -9999
Private 0 0 0 0 0 0
Total 840 0 0 23999 140 -9999
Nuclear Central 0 0 0 0 0 0
Central 3470 250 0 360 110 -250
State 463615 1030 0 115999 99755 -1060235
Private 0 0 600 0 600 600
Total 810615 1280 600 151999 809755 -710235
Electricity Generation (MU) Targets and Achievements for 2016-17
13
2 Capacity Addition Targets Achievements During Oct-2018
Schemes Sector
Target 2018-19
April 2018- Oct 2018Oct-18
Hydro
All India
Capacity Addition TargetsAchievements during the Month of Oct-2018
Thermal
12
80
24
0
0
15
20
67
0
14
0
0
81
0
0
200
400
600
800
1000
1200
1400
1600
Thermal Hydro Nuclear Total
MW
Targets and Achievement during 2018-19Target Achievement
600
0 00 0
600
0
100
200
300
400
500
600
700
800
900
1000
Target Achievement
MW
Targets and Achievement during Oct 2018Thermal Hydro
Nuclear Total
File NoCEA-CH-14-1142018-Coordination Division
Coal Gas Diesel Total
State 1593400 287920 000 1881320 000 869755 68956 2820031
Private 2276083 55800 000 2331883 000 251400 1261535 3844818
Central 1258537 234406 000 1492943 162000 849622 32900 2537465
Sub Total 5128020 578126 000 5706146 162000 1970777 1363391 9202314
State 2128000 284982 000 2412982 000 544650 31119 2988751
Private 3488567 467600 000 3956167 000 48100 2005170 6009437
Central 1504295 328067 000 1832362 184000 162000 66130 2244492
Sub Total 7120862 1080649 000 8201511 184000 754750 2102418 11242679
State 1943250 79198 28788 2051236 000 1183803 52102 3287141
Private 1212450 532210 47370 1792030 000 000 3495815 5287845
Central 1422502 35958 000 1458460 332000 000 49190 1839650
Sub Total 4578202 647366 76158 5301726 332000 1183803 3597107 10414636
State 695000 10000 000 705000 000 353792 22511 1081303
Private 637500 000 000 637500 000 39900 84853 762253
Central 1387664 000 000 1387664 000 100520 1000 1489184
Sub Total 2720164 10000 000 2730164 000 494212 108364 3332740
State 000 49771 3600 53371 000 42200 25674 121245
Private 000 2450 000 2450 000 000 2571 5021
Central 52002 125360 000 177362 000 103000 500 280862
Sub Total 52002 177581 3600 233183 000 145200 28745 407128
State 000 000 4005 4005 000 000 525 4530
Private 000 000 000 000 000 000 221 221
Central 000 000 000 000 000 000 510 510
Sub Total 000 000 4005 4005 000 000 1256 5261
State 6359650 711871 36393 7107913 000 2994200 200887 10303000
Private 7614600 1058060 47370 8720030 000 339400 6850164 15909594
Central 5625000 723791 000 6348791 678000 1215142 150230 8392163
Total 19599250 2493722 83763 22176734 678000 4548742 7201281 34604757
Figures at decimal may not tally due to rounding off
Note -
(As per latest information available with MNRE)
Break up of RES all India as on 30092018 is given below (in MW)
450695 3461510 2402166 7201281
A Oct 2018 669755 MW
B Capacity Retired
during
Oct 2018 705 MW
C Oct 2018 0 MW
D Oct 2018 A-B+C -35245 MW
Share of Telangana from JEGURUPADU CCPP Ph II has been removed and the same has been added to private sector of Andhra Pradesh due to expiry of PPA as per
request from TS Transco
Region
ALL INDIA INSTALLED CAPACITY (IN MW) OF POWER STATIONS (As on 31102018)
(UTILITIES)
Net Capacity Added during
1 RES include SHP BP UampI Solar and Wind Energy Installed capacity in respect of RES (MNRE) as on 30092018
Small
Hydro PowerWind Power
Bio-PowerSolar Power
Total
CapacityBM PowerCogen Waste to Energy
2 U-1 to 7 (76995=69755 MW) of LAKWA REPLACEMENT POWER PROJECT commissioned in April 2018 but intimated in October 2018
has been added to state sector of Assam
1 Badarpur TPS (705 MW) has been retired from central sector of Northern Region
Capacity Up-rated
Ownership Sector
873080 13830
Capacity Added during
1 U-2 (600 MW) of MAHAN TPP has been commissioned and added to private sector of Madhya Pradesh
Grand TotalThermalNuclear Hydro
Islands
ALL INDIA
Abbreviation- SHP=Small Hydro Project (le 25 MW) BP=Biomass Power UampI=Urban amp Industrial Waste Power RES=Renewable Energy Sources
Northern Region
Western Region
Southern Region
Eastern Region
North Eastern
Region
RES
(MNRE)
Modewise breakup
File NoCEA-CH-14-1142018-Coordination Division
Coal Gas Diesel Total
State 13500 180040 000 193540 000 000 000 193540
Private 86922 10800 000 97722 000 000 12157 109879
Central 311272 20701 000 331973 10283 72309 000 414565
Sub-Total 411694 211541 000 623235 10283 72309 12157 717984
State 272000 15000 000 287000 000 110282 5930 403212
Private 408078 000 000 408078 000 20000 34745 462823
Central 129472 53561 000 183034 10094 66370181 500 259998
Sub-Total 809550 68561 000 878112 10094 196652 41175 1126032
State 000 000 000 000 000 69460 25661 95121
Private 000 000 000 000 000 99200 60536 159736
Central 18340 6201 000 24541 2895 122388 000 149824
Sub-Total 18340 6201 000 24541 2895 291048 86197 404681
State 000 17500 000 17500 000 123000 12903 153403
Private 000 000 000 000 000 000 5985 5985
Central 50639 12907 000 63547 6798 109188 000 179533
Sub-Total 50639 30407 000 81047 6798 232188 18888 338921
State 176000 15000 000 191000 000 259770 12780 463550
Private 511550 000 000 511550 000 28800 115462 655812
Central 85458 26401 000 111859 19681 92342 000 223882
Sub-Total 773008 41401 000 814409 19681 380912 128242 1343244
State 585000 60380 000 645380 000 109618 2385 757383
Private 388200 000 000 388200 000 10400 710680 1109280
Central 120625 22110 000 142735 55674 73901 29400 301710
Sub-Total 1093825 82490 000 1176315 55674 193919 742465 2168373
State 546900 000 000 546900 000 72410 2510 621820
Private 871433 000 000 871433 000 84200 266691 1222324
Central 379639 54949 000 434588 28948 180253 3000 646789
Sub-Total 1797972 54949 000 1852921 28948 336863 272201 2490933
State 000 000 000 000 000 125215 6787 132002
Private 9900 45000 000 54900 000 8800 52244 115944
Central 34324 6966 000 41290 3124 47554 000 91968
Sub-Total 44224 51966 000 96190 3124 181569 59031 339914
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 3035 3035
Central 3815 1503 000 5317 801 10171 000 16289
Sub-Total 3815 1503 000 5317 801 10171 3035 19324
124953 29105 000 154058 23703 75145 000 252907
State 1593400 287920 000 1881320 000 869755 68956 2820031
Private 2276083 55800 000 2331883 000 251400 1261535 3844818
Central 1258537 234406 000 1492943 162000 849622 32900 2537465
Grand Total 5128020 578126 000 5706146 162000 1970777 1363391 9202314
Uttar Pradesh
Uttarakhand
Chandigarh
Grand TotalThermalNuclear
Hydro
(Renewable)
RES
(MNRE)
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
NORTHERN REGION
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
(As on 31102018)
Central - Unallocated
Total (Northern
Region)
Delhi
Haryana
Himachal Pradesh
Jammu amp Kashmir
Punjab
Rajasthan
State Ownership Sector
Modewise breakup
File NoCEA-CH-14-1142018-Coordination Division
(As on 31102018)
Coal Gas Diesel Total
State 000 000 000 000 000 000 005 005
Private 000 4800 000 4800 000 000 091 4891
Central 45478 1967 000 47445 2600 000 000 50045
Sub-Total 45478 6767 000 52245 2600 000 096 54941
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 1301 1301
Central 12663 4334 000 16997 700 000 000 17697
Sub-Total 12663 4334 000 16997 700 000 1301 18998
State 475000 217782 000 692782 000 77200 800 770782
Private 776567 396000 000 1172567 000 000 729782 1902349
Central 309051 42400 000 351451 55900 000 23830 431181
Sub-Total 1560618 656182 000 2216800 55900 77200 754412 3104312
State 408000 000 000 408000 000 170366 8396 586762
Private 617400 10000 000 627400 000 000 378205 1005605
Central 279441 25700 000 305141 27300 152000 30000 514441
Sub-Total 1304841 35700 000 1340541 27300 322366 416601 2106808
State 228000 000 000 228000 000 12000 1105 241105
Private 849000 000 000 849000 000 000 52430 901430
Central 195344 000 000 195344 4800 10000 000 210144
Sub-Total 1272344 000 000 1272344 4800 22000 53535 1352679
State 1017000 67200 000 1084200 000 285084 20813 1390097
Private 1245600 56800 000 1302400 000 48100 842815 2193315
Central 433475 227273 000 660748 69000 000 12300 742048
Sub-Total 2696075 351273 000 3047348 69000 333184 875927 4325459
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 546 546
Central 17444 6634 000 24078 900 000 000 24978
Sub-Total 17444 6634 000 24078 900 000 546 25524
211400 19759 000 231159 22800 000 000 253959
State 2128000 284982 000 2412982 000 544650 31119 2988751
Private 3488567 467600 000 3956167 000 48100 2005170 6009437
Central 1504295 328067 000 1832362 184000 162000 66130 2244492
Grand Total 7120862 1080649 000 8201511 184000 754750 2102418 11242679
Central - Unallocated
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
WESTERN REGION
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
State Ownership Sector
Modewise breakup
Grand TotalThermalNuclear
Hydro
(Renewable)
RES
(MNRE)
Total (Western
Region)
Goa
Daman amp Diu
Gujarat
Madhya Pradesh
Chhattisgarh
Maharashtra
Dadra amp Nagar
Naveli
File NoCEA-CH-14-1142018-Coordination Division
(As on 31102018)
Coal Gas Diesel Total
State 501000 23540 000 524540 000 167360 4875 696775
Private 387388 381318 3680 772386 000 000 693073 1465459
Central 167456 000 000 167456 12727 000 25000 205183
Sub-Total 1055844 404858 3680 1464382 12727 167360 722948 2367417
State 508250 000 000 508250 000 247993 4022 760265
Private 83945 83182 000 167127 000 000 375048 542175
Central 195612 000 000 195612 14873 000 1000 211485
Sub-Total 787807 83182 000 870989 14873 247993 380070 1513925
State 502000 000 12792 514792 000 359980 15533 890305
Private 195850 000 2520 198370 000 000 1275640 1474010
Central 282920 000 000 282920 69800 000 000 352720
Sub-Total 980770 000 15312 996082 69800 359980 1291173 2717035
State 000 000 15996 15996 000 188150 15402 219548
Private 61500 17400 000 78900 000 000 20899 99799
Central 114322 35958 000 150280 36200 000 5000 191480
Sub-Total 175822 53358 15996 245176 36200 188150 41301 510827
State 432000 52408 000 484408 000 220320 12270 716998
Private 483767 50310 41170 575247 000 000 1130984 1706231
Central 448952 000 000 448952 144800 000 18190 611942
Sub-Total 1364719 102718 41170 1508607 144800 220320 1161444 3035171
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 000 000
Central 10000 000 000 10000 000 000 000 10000
Sub-Total 10000 000 000 10000 000 000 000 10000
State 000 3250 000 3250 000 000 000 3250
Private 000 000 000 000 000 000 171 171
Central 24840 000 000 24840 8600 000 000 33440
Sub-Total 24840 3250 000 28090 8600 000 171 36861
178400 000 000 178400 45000 000 000 223400
State 1943250 79198 28788 2051236 000 1183803 52102 3287141
Private 1212450 532210 47370 1792030 000 000 3495815 5287845
Central 1422502 35958 000 1458460 332000 000 49190 1839650
Grand Total 4578202 647366 76158 5301726 332000 1183803 3597107 10414636
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
SOUTHERN REGION
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
State Ownership Sector
Modewise breakup
Grand TotalThermal RES
(MNRE)Nuclear
Hydro
(Renewable)
Kerala
Tamil Nadu
NLC
Puducherry
Central - Unallocated
Total (Southern
Region)
Andhra Pradesh
Telangana
Karnataka
File NoCEA-CH-14-1142018-Coordination Division
(As on 31102018)
Coal Gas Diesel Total
State 71000 000 000 71000 000 000 7070 78070
Private 28100 000 000 28100 000 000 25545 53645
Central 291433 000 000 291433 000 11000 000 302432
Sub-Total 390533 000 000 390533 000 11000 32615 434147
State 42000 000 000 42000 000 13000 405 55405
Private 73000 000 000 73000 000 000 3207 76207
Central 39374 000 000 39374 000 6100 000 45474
Sub-Total 154374 000 000 154374 000 19100 3612 177086
State 540000 10000 000 550000 000 98600 9195 657795
Private 242500 000 000 242500 000 000 34452 276952
Central 76077 000 000 76077 000 41000 000 117077
Sub-Total 858577 10000 000 868577 000 139600 43647 1051824
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 000 000
Central 698504 000 000 698504 000 18620 000 717124
Sub-Total 698504 000 000 698504 000 18620 000 717124
State 42000 000 000 42000 000 206192 630 248822
Private 293900 000 000 293900 000 000 21648 315548
Central 163390 000 000 163390 000 8900 1000 173290
Sub-Total 499290 000 000 499290 000 215092 23278 737660
State 000 000 000 000 000 36000 5211 41211
Private 000 000 000 000 000 39900 001 39901
Central 8703 000 000 8703 000 6400 000 15103
Sub-Total 8703 000 000 8703 000 82300 5212 96215
110183 000 000 110183 000 8501 000 118684
State 695000 10000 000 705000 000 353792 22511 1081303
Private 637500 000 000 637500 000 39900 84853 762253
Central 1387664 000 000 1387664 000 100520 1000 1489184
Grand Total 2720164 10000 000 2730164 000 494212 108364 3332740
(As on 31102018)
Coal Gas Diesel Total
State 000 32821 000 32821 000 10000 3001 45822
Private 000 2450 000 2450 000 000 1680 4130
Central 27902 43556 000 71458 000 36851 000 108309
Sub-Total 27902 78827 000 106729 000 46851 4681 158261
State 000 000 000 000 000 000 10710 10710
Private 000 000 000 000 000 000 539 539
Central 2470 4682 000 7152 000 11800 000 18952
Sub-Total 2470 4682 000 7152 000 11800 11249 30201
State 000 000 000 000 000 32200 3103 35303
Private 000 000 000 000 000 000 006 006
Central 3040 10969 000 14009 000 7446 000 21455
Sub-Total 3040 10969 000 14009 000 39646 3109 56764
State 000 16950 000 16950 000 000 1601 18551
Private 000 000 000 000 000 000 009 009
Central 3740 43695 000 47435 000 7077 500 55012
Sub-Total 3740 60645 000 64385 000 7077 2110 73572
State 000 000 3600 3600 000 000 545 4145
Private 000 000 000 000 000 000 217 217
Central 3140 7157 000 10297 000 9677 000 19974
Sub-Total 3140 7157 3600 13897 000 9677 762 24336
State 000 000 000 000 000 000 3067 3067
Private 000 000 000 000 000 000 100 100
Central 2140 4893 000 7033 000 5860 000 12893
Sub-Total 2140 4893 000 7033 000 5860 3167 16060
State 000 000 000 000 000 000 3647 3647
Private 000 000 000 000 000 000 020 020
Central 2070 4046 000 6116 000 9913 000 16029
Sub-Total 2070 4046 000 6116 000 9913 3667 19696
7500 6362 000 13862 000 14376 000 28238
State 000 49771 3600 53371 000 42200 25674 121245
Private 000 2450 000 2450 000 000 2571 5021
Central 52002 125360 000 177362 000 103000 500 280862
Grand Total 52002 177581 3600 233183 000 145200 28745 407128
Central - Unallocated
Total (Eastern
Region)
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
NORTH-EASTERN REGION
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
State Ownership Sector
Modewise breakup
Grand TotalThermalNuclear
Bihar
Jharkhand
West Bengal
DVC
Odisha
Sikkim
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
EASTERN REGION
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
Ownership Sector
Modewise breakup
Grand TotalThermalNuclear
Hydro
(Renewable)
RES
(MNRE)
Manipur
Nagaland
State
Mizoram
Central - Unallocated
Total (North-
Eastern Region)
Hydro
(Renewable)
RES
(MNRE)
Assam
Arunachal Pradesh
Meghalaya
Tripura
File NoCEA-CH-14-1142018-Coordination Division
(As on 31102018)
Coal Gas Diesel Total
State 000 000 4005 4005 000 000 525 4530
Private 000 000 000 000 000 000 146 146
Central 000 000 000 000 000 000 510 510
Sub-Total 000 000 4005 4005 000 000 1181 5186
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 075 075
Central 000 000 000 000 000 000 000 000
Sub-Total 000 000 000 000 000 000 075 075
State 000 000 4005 4005 000 000 525 4530
Private 000 000 000 000 000 000 221 221
Central 000 000 000 000 000 000 510 510
Grand Total 000 000 4005 4005 000 000 1256 5261
19
Andaman amp
Nicobar
lakshadweep
Total (Islands)
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
State Ownership Sector
Modewise breakup
Grand TotalThermalNuclear
Hydro
(Renewable)
RES
(MNRE)
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
ISLANDS
File NoCEA-CH-14-1142018-Coordination Division
SrNo Contents Page
1 Executive summary of Target and Achievement of Transmission Lines during 2018-19
20(1)
2 List of Transmission Lines CommissionedReady for commissioning during Oct-2018 20(2)
Section C - Transmission Lines
File NoCEA-CH-14-1142018-Coordination Division
Executive summary of Target and Achievement of Transmission Lines during 2018-19 As on Oct-18
(All figures in circuit kms)
Centr
al S
ecto
r
Sta
te S
ecto
r
JV
Private
Secto
r
To
tal
Centr
al S
ecto
r
Sta
te S
ecto
r
JV
Private
Secto
r
To
tal
Centr
al S
ecto
r
Sta
te S
ecto
r
JV
Private
Secto
r
To
tal
Centr
al S
ecto
r
Sta
te S
ecto
r
JV
Private
Secto
r
To
tal
Centr
al S
ecto
r
Sta
te S
ecto
r
JV
Private
Secto
r
To
tal
Cen
tral S
ecto
r
Sta
te S
ecto
r
JV
Pri
vate
Secto
r
Gra
nd
To
tal
0 0 0 0 0 0 0 0 4692 766 827 6285 3045 5906 980 9931 553 5878 0 6431 8290 12550 1807 22647
Oct18 Programme 0 0 0 0 0 0 0 0 300 0 0 300 662 90 562 1314 0 723 0 723 962 813 562 2337
Achievement 0 0 0 0 0 0 0 0 729 0 0 729 471 266 0 737 0 401 0 401 1200 667 0 1867
Upto Oct-18 Programme 0 0 0 0 0 0 0 0 3004 416 0 3420 1350 3109 562 5021 481 4346 0 4827 4835 7871 562 13268
Achievement 0 0 0 0 0 0 0 0 2286 0 178 2464 1436 1783 1595 4814 60 4461 0 4521 3782 6244 1773 11799
20(1)
220 kV Grand Total 800 kV 500 kV
Programme 2018-19
Programme
Achievement
HVDC765 kV 400 kV
File NoCEA-CH-14-1142018-Coordination Division
SlNo Line
Length
(cKM)
1 2 3 4 5 6
1 765 Jharsuguda - Dharamjaygarh line DC PGCIL 296
2 765LILO of Kurnool - Thirvualam line at
CuddapahDC PGCIL 190
3 765 Salem PS - Madhugiri PS line SC PGCIL 243
4 400 Cuddapah - Hindupur line (Q) DC PGCIL 338
5 400LILO of Both Ckt of Bamnauli - Samaypur at
TughlakabadMC PGCIL 114
6 400LILO-Out of Cuddapah - Hindupur line (Q)
(Both Ckts) at NP Kunta ssDC PGCIL 19
1200
7 400LILO of Sterlite - Meramundali at Lapanga
4oo kV ssDC OPTCL 14
8 400 Sterlite - Lapanga line DC OPTCL 37
9 400 TMDC Podili - Sattapenalli line DC APTRANSCO 215
10 230Neyveli 230110 kV ss - Eachangadu
230kV FeederSC TANTRANSCO 1
11 230 NNTPS - Neyveli 230110kV ss DC TANTRANSCO 2
12 220 Ajmer (400 kV) - Bherunda (TK) DC RVPNL 100
13 220 Aligarh - Atrauli line DC UPPTCL 77
14 220 Khandwa - Chhanera line DC MPPTCL 78
15 220LILO of one Ckt of Hadala - Sartanpar line
at Wankaner on MC towersDC GETCO 6
16 220 LILO of one Ckt of Vita - Miraj at Alkud ss DC MSETCL 27
17 220 Mendhigiri - Alkud ss DC MSETCL 110
667
1867
20(2)
Grand Total
2Transmission Lines (220 kV and above) CommissionedReady for commissioning During Oct-2018
As on 31-10-18
Voltage
Level (kV)Name of Transmission Lines
Circuit
Type
Executing
Agency
CENTRAL SECTOR
Total of CENTRAL SECTOR
STATE SECTOR Sector
Total of STATE SECTOR
File NoCEA-CH-14-1142018-Coordination Division
SN Contents Page
1 Executive summary of Target and Achievement of Substations during 2018-19 21(1)
2Sub Stations (220 kV and above) commissionedready for commisssioning during Oct-
201821(2)
Section D - Sub Stations
File NoCEA-CH-14-1142018-Coordination Division
1 Executive summary of Target and Achievement of Substations during 2018-19 As on Oct-18
(All figures in circuit MVA)
Centr
al S
ecto
r
Sta
te S
ecto
r
JV
Private
Secto
r
To
tal
Centr
al S
ecto
r
Sta
te S
ecto
r
JV
Private
Secto
r
To
tal
Centr
al S
ecto
r
Sta
te S
ecto
r
JV
Private
Secto
r
To
tal
Centr
al S
ecto
r
Sta
te S
ecto
r
JV
Private
Secto
r
To
tal
Centr
al S
ecto
r
Sta
te S
ecto
r
JV
Private
Secto
r
To
tal
Cen
tral S
ecto
r
Sta
te S
ecto
r
JV
Pri
vate
Secto
r
Gra
nd
To
tal
3000 0 0 3000 0 0 0 0 22200 0 0 22200 8185 13085 630 21900 740 14760 0 15500 34125 27845 630 62600
Oct18 Programme 0 0 0 0 0 0 0 0 0 0 0 0 1000 1260 630 2890 0 1400 0 1400 1000 2660 630 4290
Achievement 0 0 0 0 0 0 0 0 3000 0 0 3000 1500 3120 0 4620 0 2220 0 2220 4500 5340 0 9840
Upto Oct-18 Programme 0 0 0 0 0 0 0 0 10000 0 0 10000 6130 7435 630 14195 0 9670 0 9670 16130 17105 630 33865
Achievement 0 0 0 0 0 0 0 0 14000 0 0 14000 9000 7550 630 17180 0 10610 0 10610 23000 18160 630 41790
21(1)
220 kV Grand Total 800 kV 500 kV
Programme 2018-19
Programme
Achievement
HVDC765 kV 400 kV
File NoCEA-CH-14-1142018-Coordination Division
As on 31-10-18
Sl Voltage Ratio Capacity
No (kVkV) (MWMVA)
1 2 3 4 5
1 Cuddapah Ss 765400 PGCIL 3000
2 Tughlakabad SS (GIS) 400220 PGCIL 1500
Total of CENTRAL SECTOR 4500
3 Panki Kanpur (Aug) TF-I 400200 UPPTCL 75
4 Hindupur ss (1st ICT) 400220 APTRANSCO 315
5 Thappagundu ss 400110 TANTRANSCO 600
6 Mendhasal (2nd power TF) 400220 OPTCL 20
7 Jodhpur ss (New) 400220 RVPNL 315
8 Shankarpally 400220 TSTRANSCO 500
9 Podili ss (1st ICT) 400220 APTRANSCO 315
10 Doni (Gadag)SS 400220 KPTCL 1000
11 Porur (Addl TF) 230110 TANTRANSCO 100
12 Anuppankulam (Addl TF) 230110 TANTRANSCO 60
13 Neyveli SS 230110 TANTRANSCO 480
14 Savarkundla (Aug) 22066 GETCO 60
15 Bhuna (Aug) 220132 HVPNL 100
16 Madanpur (Aug) 22066 HVPNL 100
17 Gurgaon Sec-52A (Aug) 22066 HVPNL 160
18 IA Hisar (Aug) 220132 HVPNL 50
19 Narwana (Aug) 220132 HVPNL 60
20 Therubali (3rd Auto TF) 220132 OPTCL 160
21 Halasar ss 220132 RVPNL 160
22 Bansi Siddaharthnagar (Aug) TF-I 220132 UPPTCL 60
23 Hata Kushinagar (New) TF-I 220132 UPPTCL 100
24 Gomti nagar Lucknow (Aug) TF-IV 22033 UPPTCL 60
25 Kanpur Road Lucknow (New) TF-III 22033 UPPTCL 60
26 Asoj (Aug) 22066 GETCO 150
27 Kangasiyali (Aug) 22066 GETCO 60
28 Karmsad (Aug) 22066 GETCO 160
29 Lalpar (Aug) 22066 GETCO 60
TOTAL STATE SECTOR 5340
GRAND TOTAL 9840
21(2)
PRIVATE SECTOR
CENTRAL SECTOR
STATE SECTOR
2Sub-Stations (220 kV and above) CommissionedReady for commissioning During Oct-2018
Name of Sub StationsExecuting
Agency
File NoCEA-CH-14-1142018-Coordination Division
SN Contents Page
1 Electricity Generation (MU) Targets and Achievements for 2018-19 22
Section E - Electricity Generation
File NoCEA-CH-14-1142018-Coordination Division
Programme Achievement Ach Programme Achievement Ach
Central Sector 35160700 3028100 3162321 10443 20144400 21150469 10499
State Sector 35132000 3010000 3017260 10024 19922100 19549030 9813
PvtIPP Sector 36999700 3240600 3375603 10417 21598300 20794155 9628
PvtUTL Sector 1857600 164500 180597 10979 1130900 1203107 10638
Total 109150000 9443200 9735781 10310 62795700 62696761 9984
Central Sector 5617600 420900 451004 10715 4193000 4045436 9648
State Sector 6110600 559500 708469 12663 4049400 4433000 10947
PvtIPP Sector 1141800 80500 90122 11195 976400 1021963 10467
PvtUTL Sector 130000 11300 12564 11119 76700 99943 13030
Total 13000000 1072200 1262159 11772 9295500 9600342 10328
Central Sector 3850000 353300 303310 8585 2068900 2203540 10651
Total 3850000 353300 303310 8585 2068900 2203540 10651
Bhutan Import 500000 63300 35395 5592 347000 416660 12007
Central Sector 44628300 3802300 3916635 10301 26406300 27399445 10376
State Sector 41242600 3569500 3725729 10438 23971500 23982030 10004
Pvt Sector 40129100 3496900 3658886 10463 23782300 23119168 9721
Total 126500000 10932000 11336645 10370 74507100 74917303 10055
Provisional based on actual-cum-Assesment
Figs in MU
Cummulative
Achievement
Cummulative
Achievement
Sep-18 Sep-17 Upto Sep-2018 Upto Sep-2017
1073794 748889 7332680 5660929
22
Renewable Energy Generation
Achievement
Oct-2018
1 Electricity Generation (MU) Targets and Achievememts for 2018-19
All India Energy Generation During April 2018- Oct 2018 (MU)
Target (2018-19)April 2018- Oct 2018
Sector
Hydro
Thermal
Nuclear
627957
92955
20689
745071
626968
96003
22035
749173
0
100000
200000
300000
400000
500000
600000
700000
800000
Thermal Hydro Nuclear Total
Programme
Achievement
File NoCEA-CH-14-1142018-Coordination Division
SN Contents Page
1 Energy Power Supply Position (Provisional) for Oct-2018 and during April 2018- Oct 2018 23
2 Peak Power Supply Position (Provisional) for Oct-2018 and during April 2018- Oct 2018 24
3 Energy Power Supply Position (Revised) for Sep-2018 and during April 2018- Sept 2018 25
4 Peak Power Supply Position (Revised) for Sep-2018 and during April 2018- Sept 2018 26
5 Notified Power cuts Restrictions on Industries during Oct-2018 27
6 Power Supply to Agricultural Sector during Oct-2018 28
Section F - Power supply position
File NoCEA-CH-14-1142018-Coordination Division
आकड़ मममलयन यननट नट Figures in MU net
ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied
कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )
चडीगढ़ Chandigarh 108 108 0 00 1055 1055 0 00
दिलली Delhi 2490 2489 1 00 22524 22510 14 01
हरियजणज Haryana 4554 4554 0 00 35205 35205 0 00
दहमजचल परिश Himachal Pradesh 788 787 2 02 5728 5560 168 29
रमम कशमीि Jammu amp Kashmir 1497 1219 278 186 10982 8865 2117 193
परजब Punjab 4418 4418 0 00 38832 38819 13 00
िजरसथजन Rajasthan 6748 6748 0 00 45341 45181 160 04
उतति परिश Uttar Pradesh 10136 9973 164 16 75485 74808 676 09
उततिजखड Uttarakhand 1083 1081 3 03 8395 8310 85 10
उततरी कषतर Northern Region 31822 31375 447 14 243547 240314 3233 13
छततीसगढ़ Chhattisgarh 2454 2453 1 00 16119 16091 28 02
गरिजत Gujarat 11636 11636 0 00 70782 70768 14 00
मधय परिश Madhya Pradesh 5860 5859 1 00 38412 38410 2 00
महजिजषटर Maharashtra 15223 15095 128 08 95489 95355 134 01
िमन औि दिउ Daman amp Diu 216 216 0 00 1523 1523 0 00
िजिि व नगि हवली Dadra amp Nagar Haveli 553 553 0 00 3757 3757 0 00
गोवज Goa 366 366 0 00 2497 2495 2 01
पशचिमी कषतर Western Region 36308 36178 130 04 228579 228398 180 01
आनधर परिश Andhra Pradesh 5860 5854 6 01 37377 37334 43 01
तलगजनज Telangana 6748 6742 6 01 38251 38205 46 01
कनजाटक Karnataka 5842 5835 7 01 39111 39059 52 01
किल Kerala 2116 2096 20 09 14256 14160 96 07
तममल नजड Tamil Nadu 8611 8601 10 01 65742 65666 76 01
पडचिी Puducherry 216 215 1 05 1654 1646 8 05
लकष-दवीप Lakshadweep 4 4 0 0 27 27 0 0
दकषकषणी कषतर Southern Region 29392 29342 50 02 196390 196069 321 02
बबहजि Bihar 2742 2738 4 01 19143 18951 192 10
िजमोिि घजटी ननगम DVC 1712 1698 13 08 13096 12828 268 20
झजिखणड Jharkhand 701 697 4 06 5022 4949 73 15
ओडडशज Odisha 3147 3134 13 04 20224 20192 32 02
पशशचम बगजल West Bengal 4204 4200 4 01 33008 32881 127 04
मसशककम Sikkim 40 40 0 00 279 279 0 01
अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 67 202 188 13 67
परवी कषतर Eastern Region 12547 12507 40 03 90772 90080 692 08
अरणजचल परिश Arunachal Pradesh 67 66 1 09 502 496 7 13
असम Assam 833 809 24 29 6153 5903 250 41
मणणपि Manipur 72 71 1 10 485 478 7 14
मघजलय Meghalaya 147 147 0 00 1043 1042 0 00
ममज़ोिम Mizoram 63 62 1 08 365 359 5 14
नजगजलड Nagaland 76 67 8 110 540 481 59 109
बिपिज Tripura 130 129 1 09 1025 1007 19 18
उततर-परवी कषतर North-Eastern Region 1387 1351 35 25 10113 9766 346 34
समपणण भारत All India 111455 110753 702 06 769399 764627 4773 06
23
ऊराण वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Energy Power Supply Position Report (Provisional)
राजयStateअकरबर2018 October2018 अपरल2018 -अकरबर2018 April2018 to October2018
ऊरजा पनत ा म कमी ऊरजा पनत ा म कमीEnergy not Supplied
Excludes energy exported to Bangladesh
Energy not Supplied
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
File NoCEA-CH-14-1142018-Coordination Division
अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met
कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )
चडीगढ़ Chandigarh 217 217 0 00 369 369 0 00
दिलली Delhi 4713 4713 0 00 7016 7016 0 00
हरियजणज Haryana 7948 7948 0 00 10270 10270 0 00
दहमजचल परिश Himachal Pradesh 1520 1520 0 00 1520 1520 0 00
रमम कशमीि Jammu amp Kashmir 2836 2269 567 200 2951 2361 590 200
परजब Punjab 7979 7979 0 00 12638 12638 0 00
िजरसथजन Rajasthan 11450 11450 0 00 11698 11698 0 00
उतति परिश Uttar Pradesh 17434 16745 688 39 20498 20062 436 21
उततिजखड Uttarakhand 1943 1943 0 00 2143 2143 0 00
उततरी कषतर Northern Region 50659 49635 1024 20 63166 61726 1440 23
छततीसगढ़ Chhattisgarh 4414 4268 146 33 4414 4268 146 33
गरिजत Gujarat 18148 18130 19 01 18148 18130 19 01
मधय परिश Madhya Pradesh 11356 11317 39 03 11356 11317 39 03
महजिजषटर Maharashtra 23864 23159 705 30 23864 23254 610 26
िमन औि दिउ Daman amp Diu 342 341 1 02 357 356 1 02
िजिि व नगि हवली Dadra amp Nagar Haveli 784 780 4 05 816 815 1 01
गोवज Goa 536 536 0 00 596 596 0 00
पशचिमी कषतर Western Region 56548 55695 853 15 56548 55695 853 15
आनधर परिश Andhra Pradesh 9435 9435 0 00 9435 9435 0 00
तलगजनज Telangana 10603 10603 0 00 10815 10815 0 00
कनजाटक Karnataka 10741 10741 0 00 10741 10741 0 00
किल Kerala 3727 3644 83 22 4050 3997 53 13
तममल नजड Tamil Nadu 14747 14333 414 28 15029 14981 47 03
पडचिी Puducherry 363 362 1 03 420 400 19 46
लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0
दकषकषणी कषतर Southern Region 45279 45226 53 01 45946 45684 262 06
बबहजि Bihar 4945 4945 0 00 5050 5045 5 01
िजमोिि घजटी ननगम DVC 2729 2729 0 00 2874 2874 0 00
झजिखणड Jharkhand 1260 1260 0 00 1339 1284 55 41
ओडडशज Odisha 5624 5224 400 71 5624 5357 268 48
पशशचम बगजल West Bengal 8775 8775 0 00 9130 9123 7 01
मसशककम Sikkim 86 86 0 00 90 90 0 00
अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7
परवी कषतर Eastern Region 22959 22567 392 17 22959 22567 392 17
अरणजचल परिश Arunachal Pradesh 138 125 13 94 138 133 5 37
असम Assam 1785 1704 81 45 1865 1809 56 30
मणणपि Manipur 187 185 2 11 193 186 7 36
मघजलय Meghalaya 336 336 0 00 371 368 2 07
ममज़ोिम Mizoram 99 97 2 20 103 98 4 41
नजगजलड Nagaland 134 131 3 22 156 138 18 117
बिपिज Tripura 269 269 0 00 298 293 5 17
उततर-परवी कषतर North-Eastern Region 2790 2700 90 32 2967 2850 117 39
समपणण भारत All India 172945 170604 2341 14 177022 175528 1494 08
24
अधिकतम वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Peak Power Supply Position Report (Provisional)
आकड़ मगज वजट नट Figures in MW netअपरल2018 -अकरबर2018 April2018 to October2018
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
मजग की पनता म कमी Demand not Met
Excludes the supply to Bangladesh
राजयStateअकरबर2018 October2018
मजग की पनता म कमी Demand not Met
File NoCEA-CH-14-1142018-Coordination Division
आकड़ मममलयन यननट नट Figures in MU net
ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied
कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )
चडीगढ़ Chandigarh 141 141 0 00 947 947 0 00
दिलली Delhi 2925 2924 1 00 20034 20021 13 01
हरियजणज Haryana 4794 4794 0 00 30651 30651 0 00
दहमजचल परिश Himachal Pradesh 876 853 24 27 4940 4773 167 34
रमम कशमीि Jammu amp Kashmir 1520 1246 274 180 9485 7646 1839 194
परजब Punjab 5575 5575 0 00 34414 34401 13 00
िजरसथजन Rajasthan 6202 6201 0 00 38594 38434 160 04
उतति परिश Uttar Pradesh 10211 10124 86 08 65349 64836 513 08
उततिजखड Uttarakhand 1162 1149 13 11 7311 7229 82 11
उततरी कषतर Northern Region 33405 33008 398 12 211725 208939 2786 13
छततीसगढ़ Chhattisgarh 2403 2388 15 06 13665 13638 27 02
गरिजत Gujarat 10122 10122 0 00 59146 59132 14 00
मधय परिश Madhya Pradesh 5492 5491 1 00 32552 32551 1 00
महजिजषटर Maharashtra 13615 13612 3 00 80266 80260 6 00
िमन औि दिउ Daman amp Diu 221 221 0 00 1306 1306 0 00
िजिि व नगि हवली Dadra amp Nagar Haveli 551 551 0 00 3204 3204 0 00
गोवज Goa 339 339 0 00 2131 2128 2 01
पशचिमी कषतर Western Region 32742 32723 19 01 192270 192220 50 00
आनधर परिश Andhra Pradesh 5294 5287 7 01 31518 31480 37 01
तलगजनज Telangana 6279 6272 8 01 31503 31463 40 01
कनजाटक Karnataka 5701 5693 8 01 33269 33225 45 01
किल Kerala 2050 2026 24 12 12140 12063 76 06
तममल नजड Tamil Nadu 8971 8959 12 01 57131 57065 66 01
पडचिी Puducherry 226 224 2 08 1438 1431 7 05
लकष-दवीप Lakshadweep 4 4 0 0 23 23 0 0
दकषकषणी कषतर Southern Region 28520 28460 60 02 166998 166727 271 02
बबहजि Bihar 2839 2793 46 16 16400 16213 188 11
िजमोिि घजटी ननगम DVC 1901 1750 151 79 11384 11130 254 22
झजिखणड Jharkhand 740 723 17 22 4321 4252 69 16
ओडडशज Odisha 2921 2918 3 01 17077 17058 19 01
पशशचम बगजल West Bengal 4902 4879 23 05 28804 28681 123 04
मसशककम Sikkim 39 39 0 01 239 239 0 01
अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 67 173 162 12 67
परवी कषतर Eastern Region 13341 13102 240 18 78225 77573 652 08
अरणजचल परिश Arunachal Pradesh 74 73 1 10 435 429 6 14
असम Assam 950 914 36 38 5320 5094 226 43
मणणपि Manipur 70 69 1 11 414 408 6 15
मघजलय Meghalaya 150 150 0 01 896 896 0 01
ममज़ोिम Mizoram 58 57 1 12 302 297 5 16
नजगजलड Nagaland 80 72 8 104 464 414 50 108
बिपिज Tripura 192 191 1 07 895 878 17 19
उततर-परवी कषतर North-Eastern Region 1575 1527 48 31 8726 8415 311 36
समपणण भारत All India 109584 108819 765 07 657944 653873 4071 06
Energy not Supplied Energy not Supplied
ससतबर2018 September2018 अपरल2018 -ससतबर2018 April2018 to September2018
ऊरजा पनत ा म कमी ऊरजा पनत ा म कमी
Excludes energy exported to Bangladesh
राजयState
ऊराण वरवदयत आपरतण शथिरत ररपोरण (सशोधित) Energy Power Supply Position Report (Revised)
25
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
File NoCEA-CH-14-1142018-Coordination Division
अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met
कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )
चडीगढ़ Chandigarh 293 293 0 00 369 369 0 00
दिलली Delhi 5358 5358 0 00 7016 7016 0 00
हरियजणज Haryana 9008 9008 0 00 10270 10270 0 00
दहमजचल परिश Himachal Pradesh 1466 1466 0 00 1479 1479 0 00
रमम कशमीि Jammu amp Kashmir 2951 2361 590 200 2951 2361 590 200
परजब Punjab 11405 11405 0 00 12638 12638 0 00
िजरसथजन Rajasthan 10612 10612 0 00 11698 11698 0 00
उतति परिश Uttar Pradesh 18346 18121 225 12 20498 20062 436 21
उततिजखड Uttarakhand 1996 1996 0 00 2143 2143 0 00
उततरी कषतर Northern Region 56407 55649 758 13 63166 61726 1440 23
छततीसगढ़ Chhattisgarh 4404 4075 328 75 4404 4136 268 61
गरिजत Gujarat 16963 16963 0 00 17053 16963 90 05
मधय परिश Madhya Pradesh 8811 8771 41 05 8811 8775 36 04
महजिजषटर Maharashtra 22455 22349 106 05 23395 23254 141 06
िमन औि दिउ Daman amp Diu 357 356 1 02 357 356 1 02
िजिि व नगि हवली Dadra amp Nagar Haveli 816 815 1 01 816 815 1 01
गोवज Goa 596 596 0 00 596 596 0 00
पशचिमी कषतर Western Region 52933 52895 38 01 53841 52895 945 18
आनधर परिश Andhra Pradesh 9435 9416 19 02 9435 9416 19 02
तलगजनज Telangana 10815 10815 0 00 10815 10815 0 00
कनजाटक Karnataka 10103 10090 13 01 10690 10688 2 00
किल Kerala 3888 3638 251 64 4050 3997 53 13
तममल नजड Tamil Nadu 14556 14553 3 00 15029 14981 47 03
पडचिी Puducherry 390 372 17 45 420 400 19 46
लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0
दकषकषणी कषतर Southern Region 45542 45428 114 02 45946 45684 262 06
बबहजि Bihar 5050 5045 5 01 5050 5045 5 01
िजमोिि घजटी ननगम DVC 2641 2641 0 00 2874 2874 0 00
झजिखणड Jharkhand 1233 1233 0 00 1339 1284 55 41
ओडडशज Odisha 4906 4906 0 00 5357 5357 0 00
पशशचम बगजल West Bengal 8644 8639 5 01 9130 9123 7 01
मसशककम Sikkim 78 78 0 00 90 90 0 00
अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7
परवी कषतर Eastern Region 22110 22100 10 00 22470 22290 180 08
अरणजचल परिश Arunachal Pradesh 132 130 2 15 138 133 5 37
असम Assam 1865 1809 56 30 1865 1809 56 30
मणणपि Manipur 184 182 2 13 193 186 7 36
मघजलय Meghalaya 317 317 0 00 371 368 2 07
ममज़ोिम Mizoram 95 93 2 23 103 98 4 41
नजगजलड Nagaland 142 138 5 32 156 138 18 117
बिपिज Tripura 296 293 3 10 298 293 5 17
उततर-परवी कषतर North-Eastern Region 2921 2850 71 24 2967 2850 117 39
समपणण भारत All India 177022 175528 1494 08 177022 175528 1494 08
26
मजग की पनता म कमी मजग की पनता म कमी Demand not MetDemand not Met
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
Excludes the supply to Bangladesh
अधिकतम वरवदयत आपरतण शथिरत ररपोरण (सशोधित) Peak Power Supply Position Report (Revised)
आकड़ मगज वजट नट Figures in MW net
राजयStateससतबर2018 September2018 अपरल2018 -ससतबर2018 April2018 to September2018
File NoCEA-CH-14-1142018-Coordination Division
अकरबर2018 October2018अपरल2018 -अकरबर2018 April2018 to October2018
उततरी कषतर Northern Region
चडीगढ़ Chandigarh Data not received Data not received
दिलली Delhi
हरियजणज Haryana
दहमजचल परिश Himachal Pradesh
रमम कशमीि Jammu amp Kashmir Data not received Data not received
परजब Punjab
िजरसथजन Rajasthanउतति परिश Uttar Pradesh
उततिजखड Uttarakhand
पशचिमी कषतर Western Region
छततीसगढ़ Chhattisgarh
गरिजत Gujarat
मधय परिश Madhya Pradesh
महजिजषटर Maharashtra
गोवज Goa
दकषकषणी कषतर Southern Region
आनधर परिश Andhra Pradesh
तलगजनज Telangana
कनजाटक Karnataka
किल Kerala
तममल नजड Tamil Nadu
पडचिी Puducherryपरवी कषतर Eastern Region
बबहजि Bihar
झजिखणड Jharkhand
ओडडशज Odisha
पशशचम बगजल West Bengal
N
o No
tified
Cuts
N
o No
tified
Cuts
27
अकरबर 2018 म इडथरीर पर वरवदयत करौती का वरवरवरण Notified Power CutsRestrictions on Industries during October2018
राजय कषतर State Regionऊराणमाग करौती EnergyDemand Cut
No Notified Cuts No Notified Cuts
File NoCEA-CH-14-1142018-Coordination Division
अकरबर2018 October2018अपरल2018 -अकरबर2018 April2018 to October2018
उततरी कषतर Northern Region
चडीगढ़ Chandigarh Data not received Data not received
दिलली Delhi Data not received Data not received
हरियजणज Haryana 940 hrsday 0709 - 0950 hrsday
दहमजचल परिश Himachal Pradesh No cut imposed on agriculture consumers and uninterrupted
power is being supplied to agriculture sector
HPSEBL has only 2 agriculture consumers and uninterrupted
power is being supplied to agriculture sector
रमम कशमीि Jammu amp Kashmir Data not received Data not received
परजब Punjab 0507 hrsday 0349 - 0844 hrsday
िजरसथजन Rajasthan 0630 hrsday 0630 hrsday
उतति परिश Uttar Pradesh 1825 hrsday 1814 - 1858 hrsday
उततिजखड Uttarakhand 2350 hrsday 2128 - 2357 hrsday
पशचिमी कषतर Western Region
छततीसगढ़ Chhattisgarh 18hoursday 18 hrsday
गरिजत Gujarat 805 hrsday 805 hrsday
मधय परिश Madhya Pradesh Three-Phase Supply(Irrigation)-947 hrs day
Three-Phase (Mixed) Supply - 2311 hrs day
Three-Phase Supply(Irrigation)- 0933 - 0947 hrs day Three-
Phase (Mixed) Supply - 2300 - 2320 hrs day
महजिजषटर Maharashtra Three-Phase Supply(Irrigation)- 9 hrs day
Three-Phase (Mixed) Supply - 24 hrs day
Three-Phase Supply(Irrigation)- 9 hrs day
Three-Phase (Mixed) Supply - 24 hrs day
गोवज Goa No restriction No restriction
दकषकषणी कषतर Southern Region
आनधर परिश Andhra Pradesh 07 hrsday 07 hrsday
तलगजनज Telangana 24 hoursday 24 hoursday
कनजाटक Karnataka 6 hrsday 6 hrsday
किल Kerala No Restrictions No Restrictions
तममल नजड Tamil Nadu 9 hrsday (6 hrs during day time and 3 hrs during night time) 9 hrsday (6 hrs during day time and 3 hrs during night time)
पडचिी Puducherry No Restrictions No Restrictions
परवी कषतर Eastern Region
बबहजि Bihar About 18 hrsday About 18 hrsday
झजिखणड Jharkhand About 20 hrsday About 20 hrsday
ओडडशज Odisha 24 hrsday 24 hrsday
पशशचम बगजल West Bengal About 23 hrsday About 23 hrsday
28
अकटबर 2018 कषि कषतर को षिदयत आपरति का षििरण Power Supply to Agricultural Sector during October2018
राजय कषतर State Regionऔसत वरवदयत आपरतण घनरो म Average Hours of Supply
On segregated feeders
File NoCEA-CH-14-1142018-Coordination Division
SNo Contents Page
1 Growth of Installed Capacity since 6th Plan 29
2 Progress of Transmission Sector since 6th Plan 30
3 All India Yearly Coal consumption for Power Generation (Utilities)
4 All India Annual Per Capita Consumption of Electricity since -2006
5 Average cost of power supply amp Average realisation (Paisakwh)
6 Growth of Rural Electrification amp Pump Sets Energisation
7 Status of Hydro Schemes Cleared by the CEA in Oct-2018
Section G - Growth of Power Sector
31
32
File NoCEA-CH-14-1142018-Coordination Division
(In MW)
Coal Gas Diesel Total
End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472
End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634
End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537
End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596
End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921
End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703
End of 12th Plan 19216288 2532938 83763 21832988 6780 4447842 50018 31960630
Up to Oct-2018 19599250 2493722 837629 22176734 6780 4548742 7201281 34604757
Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-17) = 51529 MW
Electricity Generation (MU) Targets and Achievements for 2016-17
Coal Gas Diesel Nuclear Hydro Res Total
1959925 2493722 837629 678000 454874 72012805 22925174
29
1 Growth of Installed Capacity Since 6th Plan
Plan YearThermal
Nuclear Hydro RES (MNRE) Total
Total Installed Capacity 34604757 MW
Coal Gas Diesel Nuclear Hydro Res
File NoCEA-CH-14-1142018-Coordination Division
Progress of Transmission Sector in the Country up to Oct 2018
1 TRANSMISSION LINES (All fig in CKM)
At the end of
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
6th plan 0 0 0 0 0 0 0 0 0 0 0 0 1831 4198 0 6029 1641 44364 0 46005 3472 48562 0 52034
7th plan 0 0 0 0 0 0 0 0 0 0 0 0 13068 6756 0 19824 4560 55071 0 59631 17628 61827 0 79455
8th plan 0 0 0 0 1634 0 0 1634 0 0 0 0 23001 13141 0 36142 6564 73036 0 79600 31199 86177 0 117376
9th plan 0 0 0 0 3234 1504 0 4738 751 409 0 1160 29345 20033 0 49378 8687 88306 0 96993 42017 110252 0 152269
10th plan 0 0 0 0 4368 1504 0 5872 1775 409 0 2184 48708 24730 0 73438 9444 105185 0 114629 64295 131828 0 196123
11th Plan 0 0 0 0 5948 1504 1980 9432 4839 411 0 5250 71023 30191 5605 106819 10140 125010 830 135980 91950 157116 8415 257481
12th Plan 6124 0 0 6124 5948 1504 1980 9432 25465 1177 4598 31240 92482 48240 17065 157787 11014 151276 978 163268 141033 202197 24621 367851
13th Plan (Up
to Mar2018)6124 0 0 6124 5948 1504 1980 9432 28666 1512 4881 35059 98247 54286 19067 171600 11258 156497 1000 168755 150243 213799 26928 390970
13th Plan (Up
to Sep-18)6124 0 0 6124 5948 1504 1980 9432 30952 1512 5059 37523 99683 56069 20662 176414 11318 160958 1000 173276 154025 220043 28701 402769
27150
75050
47900
118050
90650
30
IR addition in 12th Plan (up to
March 2017)
Total IR (up to Oct-18)
IR at the end of 11th Plan
IR at the end of 12th Plan
Envisaged IR Capacity at the end
of 13th Plan
Grand Total
Note - The figure upto the end of 10th plan in for stringing progress including the lines not commissioned Now only commissioned lines are reckoned Accordingly the figure for 10th plan (end) may read as 187555 after adjusting with (-) 10852 Ckm
Inter-regional Power Transfer Capacity
plusmn 800 kV HVDC plusmn 500 kV HVDC 765 kV 400 kV 220 kV
File NoCEA-CH-14-1142018-Coordination Division
2004-05 27800
2005-06 28100
2006-07 30200
2007-08 33000
2008-09 35500
2009-10 36700
2010-11 38700
2011-12 41756
2012-13 45460
2013-14 48940
2014-15 53040
2015-16 54590
2016-17 57430
2017-18 60800
Year
2005-06
2006-07
2007-08
2008-09
2009-10
2010-11
2011-12
2012-13
2013-14
2014-15
2015-16
2016-17
2017-18
2004-05 254 209 7568
2005-06 260 221 7636
2006-07 276 227 7423
2007-08 293 239 7727
2008-09 340 263 8713
2009-10 355 268 8870
2010-11 398 303 11975
2011-12 455 330 13514
2012-13 501 376 14867
2013-14 518 175
2014-15 520
6719
7171
3 All India yearly Coal Consumption for Power Generation (Utilities)
YEARCoal Consumption
Million Tonnes
4 All India Annual per Capita consumption of Electricity Since 2006
Per Capita Consumption ( kWh)
6314
(GrossGen+ Net Import) Mid-year population
5 Average cost of power supply amp average realization ( paiseKWH )
Yearcost of supply
(paiseunit)
Realization(paiseunit)
Including AgricultureOnly
Agriculture
1149
7335
7786
91441
8188
88363
957
1010
1075
1122
File NoCEA-CH-14-1142018-Coordination Division
Source- PFC Reports on the performance of State Power Utilities 31
File NoCEA-CH-14-1142018-Coordination Division
Sl
NoExecuting Agency
Installed
Capacity (MW)Cost (Rs crore)
Date of
Clearance
32
No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification
since 2004-05
65291374575 296361511th Plan
Cumu upto End of 11th Plan
596556 21212860
557439Cummulative up to end of 12th Plan
46708
18423975
499150
2003-042004-05
5743
9769
Cumu upto End of 10th Plan
010407 to 310308
010410 to 310311557976840909
010411 to 310312
412667
86293726
3207
482864
12632
1576036
4451722594
15455554
2314176
397343611750
2093311060316074
65109527813884
6 Growth Of Rural Electrification amp Pumpsets Energisation
Plan Year
9th Plan2002-03
134092626
4111
Pump Sets Energised Villages Electricfied (Nos)
2001-02
284064367244
1218
27801997-981998-991999-002000-01
297594
010408 to 310309010409 to 310310
10th Plan
2005-062006-07
322968331020
Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as
Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received
from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made
available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified
villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is
independent of the earlier published reports
No Hydro Electric Project has been issued concurrenceAppraisal letter by CEA during October 2018
7 Status of Hydro Schemes Cleared by the CEA in Oct-2018
Name of Scheme
File NoCEA-CH-14-1142018-Coordination Division
SN Contents Page
1 Rate of sale of power for the year 2016-17 33-41
RATE OF SALE OF POWER FOR THE YEAR 2016-17
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) NORTHERN REGION
CENTRAL SECTOR
BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 18000 66900 19800
CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 54000 222400 21600
CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 30000 144400 19600
CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 23100 91700 42600
PARBATI - III HPS NHPC LTD HYDRO-HYDRO 52000 68200 54800
DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 28000 95600 30000
CHUTAK NHPC LTD HYDRO-HYDRO 4400 22000 79800
DULHASTI HPS NHPC LTD HYDRO-HYDRO 39000 228000 56400
SALAL HPS NHPC LTD HYDRO-HYDRO 69000 342300 11000
TANAKPUR HPS NHPC LTD HYDRO-HYDRO 9420 43000 29600
URI HPS -I NHPC LTD HYDRO-HYDRO 48000 280300 16000
URI HPS - II NHPC LTD HYDRO-HYDRO 24000 147300 48600
NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 4500 24600 88200
SEWA - II NHPC LTD HYDRO-HYDRO 12000 47100 43400
ANTA CCPP NTPC LTD THERMAL-GASN 41930 67539 32400
AURAIYA CCPP NTPC LTD THERMAL-GASN 66336 53501 39100
BADARPUR TPS NTPC LTD THERMAL-COAL 70500 159153 44800
DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 84000 296170 42300
DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 98000 526686 46300
DADRI CCPP NTPC LTD THERMAL-GASHSD 82978 227469 33000
FARIDABAD CCPP NTPC LTD THERMAL-GASN 43159 115577 30800
RIHAND STPS I NTPC LTD THERMAL-COAL 100000 596766 24500
RIHAND STPS II NTPC LTD THERMAL-COAL 100000 737069 24600
RIHAND STPS III NTPC LTD THERMAL-COAL 100000 706546 30600
SINGRAULI STPS NTPC LTD THERMAL-COAL 200000 1394068 20400
TANDA TPS NTPC LTD THERMAL-COAL 44000 295438 40800
UNCHAHAR TPS I NTPC LTD THERMAL-COAL 42000 256454 39800
UNCHAHAR TPS II NTPC LTD THERMAL-COAL 42000 273577 38900
UNCHAHAR TPS III NTPC LTD THERMAL-COAL 21000 142780 43000
KOLDAM NTPC LTD HYDRO-HYDRO 80000 363260 43600
NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 303575 25841
RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 108000 668677 35374
NJHPS SJVNL HYDRO-HYDRO 150000 699496 23820
RAMPUR HPS SJVNL HYDRO-HYDRO 41202 195982 32260
TEHRI HPP THDC HYDRO-HYDRO 100000 272543 51800
KOTESHWAR HEP THDC HYDRO-HYDRO 40000 106244 53400
IGSTPS JHAJJAR ARAVALI P CPL THERMAL-COAL 150000 510429 49490
NEYVELI BARSINGSAR NEYVELI LIG CORP LTD THERMAL-LIG 25000 127520 38040
STATE SECTOR
PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 21000 14222 48200
PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 21000 19205 48400
PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 25000 102257 42600
PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 25000 62107 41800
DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 60000 312213 41000
RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 120000 35767442200
WYC HYDEL STATION HPGCL HYDRO-HYDRO 6240 20365 24900
GIRI POWER HOUSE HPSEB HYDRO-HYDRO 6000 13958 7600
ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 1695 5467 11900
BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 12000 18528 6700
GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 2250 7462 22500
BASSI POWER HOUSE HPSEB HYDRO-HYDRO 6600 29649 7500
BINWA POWER HOUSE HPSEB HYDRO-HYDRO 600 2749 19300
ANNEXURE-I
RATE OF SALE OF POWER FOR THE YEAR 2016-2017
Page 33
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) GAJ POWER HOUSE HPSEB HYDRO-HYDRO 1050 2914 26700
BANER POWER HOUSE HPSEB HYDRO-HYDRO 1200 2864 16200
HOLI POWER HOUSE HPSEB HYDRO-HYDRO 300 616 22500
THIROT POWER HOUSE HPSEB HYDRO-HYDRO 450 1126 22500
KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 1200 3064 22500
LARJI POWER HOUSE HPSEB HYDRO-HYDRO 12600 53677 23700
NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 250 750 31000
CHABA POWER HOUSE HPSEB HYDRO-HYDRO 175 465 23300
RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 150 101 13400
SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 200 000 22500
KILLAR HPSEB HYDRO-HYDRO 030 050 22500
BHABA AUGUMENP H HPSEB HYDRO-HYDRO 450 1276 22500
BS CHAMBA HPSEB HYDRO-HYDRO 045 099 19500
GUMMA HPSEB HYDRO-HYDRO 300 423 22500
GAS TURBINE POWER STATION IPGCL THERMAL-GAS 27000 67233 39300
PPS-I PPCL THERMAL-GAS 33000 175905 38300
PPS-III PPCL THERMAL-GAS 137120 196879 36100
LOWER JHELUM JampKPDD HYDRO-HYDRO 10500 60214 5100
UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 2260 10514 6300
UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 10500 44202 8500
GANDHARBAL JampKPDD HYDRO-HYDRO 1500 8925 4700
KARNAH MPH JampKPDD HYDRO-HYDRO 200 1122 31000
CHENANI I JampKPDD HYDRO-HYDRO 2330 10892 6600
CHENANI II JampKPDD HYDRO-HYDRO 200 1188 9300
CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 750 3634 14200
IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 375 2108 18500
IGO MERCHELLONG JampKPDD HYDRO-HYDRO 300 1572 29700
PAHALGAM MHP JampKPDD HYDRO-HYDRO 450 1713 32900
MARPACHOO JampKPDD HYDRO-HYDRO 075 375 29800
HAFTAL JampKPDD HYDRO-HYDRO 100 483 28700
SANJAK JampKPDD HYDRO-HYDRO 126 441 36000
SEWA-III JampKPDD HYDRO-HYDRO 900 3273 20200
BHADERWAH JampKPDD HYDRO-HYDRO 150 935 8900
BAZGO JampKPDD HYDRO-HYDRO 030 108 33300
SUMOOR JampKPDD HYDRO-HYDRO 010 045 35400
HUNDER JampKPDD HYDRO-HYDRO 040 176 26200
STAKNA JampKPDD HYDRO-HYDRO 400 1933 4100
KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 124000 662879 31360
SURATGARH TPS RRVUNL THERMAL-COAL 150000 402328 41730
CHHABRA TPS 1amp 2 RRVUNL THERMAL-COAL 50000 305946 36700
CHHABRA TPS 3 RRVUNL THERMAL-COAL 25000 151536 36700
CHHABRA TPS 4 RRVUNL THERMAL-COAL 25000 155896 36700
RAMGARH GT POWER PROJECT RRVUNL THERMAL-COAL 22050 43177 41800
RAMGARH GAS T P PROJECT 3 RRVUNL THERMAL-GAS 5000 93615 41800
DHOLPUR C C POWER PROJECT RRVUNL THERMAL-R-LNG 33000 9486 46110
MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 14000 20855 34192
MINI MICRO HYDEL (MMH) P S RRVUNL HYDRO-HYDRO 2385 851 37800
KALISINDH TPP 1 RRVUNL THERMAL-COAL 60000 341543 45000
KALISINDH TPP 2 RRVUNL THERMAL-COAL 60000 211588 45000
KHARA HEP UPJVNL HYDRO-HYDRO 7200 26654 7200
MATATILLA HEP UPJVNL HYDRO-HYDRO 3060 12219 6500
OBRA HEP UPJVNL HYDRO-HYDRO 9900 21517 6300
RIHAND UPJVNL HYDRO-HYDRO 30000 57369 5500
ANPARA A TPS UPRVUNL THERMAL-COAL 63000 317536 27000
ANPARA B TPS UPRVUNL THERMAL-COAL 100000 705605 22700
ANPARA D UPRVUNL THERMAL-COAL 100000 300158 39800
HARDUAGANJ TPS UPRVUNL THERMAL-COAL 16500 45817 49200
HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 50000 304389 46600
OBRA A TPS UPRVUNL THERMAL-COAL 28800 13158 34000
OBRA B TPS UPRVUNL THERMAL-COAL 100000 328124 21900
Page 34
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) PANKI TPS UPRVUNL THERMAL-COAL 21000 66488 50300
PARICHHA TPS UPRVUNL THERMAL-COAL 22000 38762 49400
PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 42000 231931 45600
PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 50000 276722 50400
CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 24000 70845 8290
CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 14400 75366 8390
DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 3375 9595 12080
DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 5100 18701 10520
KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4140 17359 12330
KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 12000 33001 9420
KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 3000 11953 8320
TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 9000 33983 12460
MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 30400 124510 16110
RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 19800 17897 10550
MPUR UTTARAKHAND JVNL HYDRO-HYDRO 930 5121 19200
PATHRI UTTARAKHAND JVNL HYDRO-HYDRO 2040 11636 14200
GALOGI UTTARAKHAND JVNL HYDRO-HYDRO 300 648 12500
PRIVATE SECTOR
MGTPP CLP INDIA PVT LTD THERMAL-COAL 132000 268902 41940
SHRINAGAR HEP ALAKNANDA HPCL HYDRO-HYDRO 33000 127414 48800
GAMA INFRAPROP CCPP GAMA INFRAPROP PVT THERMAL-GAS 22500 52686 47000
PPGCL (BARA) JP POWER VENTURES LTD THERMAL-COAL 198000 448200 38500
MALANA HEP MALANA PCL HYDRO-HYDRO 8600 26354 29792
MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 10000 30369 32580
ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 19200 56347 36079
KASHANG HEP H P PCL HYDRO-HYDRO 19500 5034 29200
BASPA-II HEP HBPCL HYDRO-HYDRO 30000 132769 13600
KARCHAM WANGTOO HEP HBPCL HYDRO-HYDRO 100000 434386 36600
RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 108000 582600 43700
RITHALA COMBI CY POWER PLANT TATA POWER DDL THERMAL-GAS 9480 000 11900
RAJPURA TPS NABHA POWER LTD THERMAL-GAS 140000 901484 39000
TALWANDI SABO POWER LTD TALWANDI SABO POWER LTD THERMAL-COAL 198000 636040 49548
ROJA THERMAL POWER STATION ROJA POWER SCL THERMAL-COAL 120000 727200 43400
KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 34400 63400
BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 36000 62600
MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 38200 60800
UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 37900 61500
KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 42300 58800
LALITPUR PGCL BAJAJ ENERGY PVT LTD THERMAL-COAL 198000 359400 47300
PRAYAGRAJ PGCL PRAYAGRAJ PGCL THERMAL-COAL 132000 448200 38595
KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 132000 783182 33438
WESTERN REGION
CENTRAL SECTOR
INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 100000 325333 23892
OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 52000 141663 34001
GANDHAR CCPP NTPC LTD THERMAL-GAS 65739 221924 28700
KAWAS CCPP NTPC LTD THERMAL-GASN 65620 167929 27000
KORBA I amp II NTPC LTD THERMAL-COAL 210000 1499171 20500
KORBA III NTPC LTD THERMAL-COAL 50000 358746 26600
SIPAT STPS I NTPC LTD THERMAL-COAL 198000 1479902 26800
SIPAT STPS II NTPC LTD THERMAL-COAL 100000 766549 26500
VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 126000 693142 25800
VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 100000 608781 23800
VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 100000 673475 27600
VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 100000 655924 32900
VINDHYACHAL STPS V NTPC LTD THERMAL-COAL 50000 328265 31700
MOUDA I NTPC LTD THERMAL-COAL 100000 343130 44500
MOUDA Ii NTPC LTD THERMAL-COAL 66000 40637 39900
RATNAGIRI GAS amp POWER PVT LTD RGPPL THERMAL-GAS 196708 442485 47000
KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 000 24729
TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 32000 201227 10740
Page 35
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 365122 19069
TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 787444 29324
STATE SECTOR
GSEG-HAZIRA15610 MW GUJARAT S ENEGEN LTD THERMAL-GAS 15610 1805 28200
GSEG-HAZIRA35143 MW GUJARAT S ENEGEN LTD THERMAL-GAS 35130 22276 51300
GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 21978 51800
AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 13929 26100
KORBA TPS EAST CSPGCL THERMAL-COAL 44000 198673 33880
DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 365808 27570
KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 316500 30420
HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 532878 19410
CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 515 58300
MTTPS CHAMPA U-I CSPGCL THERMAL-COAL 50000 220376 39000
MTTPS CHAMPA U-II CSPGCL THERMAL-COAL 50000 23709 10000
SHP GANGREL CSPGCL HYDRO-HYDRO 1000 2350 36790
BANGO HEP CSPGCL HYDRO-HYDRO 12000 14662 8900
MHP KORBA WEST CSPGCL HYDRO-HYDRO 170 859 38190
SIKASAR HEP CSPGCL HYDRO-HYDRO 700 418 26870
DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8843 74500
DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 19446 51500
GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 66388 71600
GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127488 41300
KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 96072 43900
KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 29841 56400
SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 184966 58800
UKAI 1-5 GSECL THERMAL-COAL 85000 204891 46900
UKAI TPS 6 GSECL THERMAL-COAL 50000 284448 48200
WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 271999 58300
WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 82808 44100
KADANA HPS GSECL HYDRO-HYDRO 24200 34433 16800
UKAI HPS GSECL HYDRO-HYDRO 30500 40585 6100
TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 123000 11500
BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 8900 10900
BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 7200 27500
JHINNA HPS MPPGCL HYDRO-HYDRO 2000 9700 18500
RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 44300 3400
GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 17300 4600
SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 4100 16900
MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 14600 27000
PENCH HPS MPPGCL HYDRO-HYDRO 16000 23700 8100
RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 3000 16900
AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 134400 35100
SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 283800 38700
SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 344600 34300
SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 111600 61600
SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 211800 58000
SSTPS PH-I MPPGCL THERMAL-COAL 120000 233100 84300
BHUSAWAL TPS MSPGCL THERMAL-COAL 142000 566258 51100
CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1365682 33700
KHAPERKHEDA MSPGCL THERMAL-COAL 134000 706207 39100
KORADI TPS MSPGCL THERMAL-COAL 62000 443206 42000
NASIK TPS MSPGCL THERMAL-COAL 63000 297275 47000
PARLI TPS MSPGCL THERMAL-COAL 113000 175934 71600
PARAS MSPGCL THERMAL-COAL 50000 267931 38700
URAN CCPP MSPGCL THERMAL-GAS 67200 320330 30600
KOYANA MSPGCL HYDRO-HYDRO 195600 328155 13100
SMALL HYDRO POWER PLANTS MSPGCL HYDRO-HYDRO 45400 93062 30500
BHIRA MSPGCL HYDRO-HYDRO 8000 10046 8400
TILLARI MSPGCL HYDRO-HYDRO 8900 10584 3100
SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 233298 20500
SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 87633 20500
PRIVATE SECTOR
Page 36
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 81282 46750
JNSTPP(JAYPEE NIGRIE) JP POWER VENTURES LTD THERMAL-COAL 132000 726695 29310
MB POWER MB POWER THERMAL-COAL 120000 345632 38310
ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 754922 28671
ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 780761 23495
ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 198000 1263784 32090
ADANI POWER MAHARA ADANI POWER LTD THERMAL-COAL 330000 1666191 34124
AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 170065 36827
SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 252035 45129
ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 458551 36000
ESSAR POWER MP LTD ESSAR POWER MP LTD THERMAL-COAL 60000 243040 28600
VEDANTA LTD (P P -I) VEDANTA LTD THERMAL-GAS 3000 15044 24000
VEDANTA LTD (P P -II) VEDANTA LTD THERMAL-GAS 3000 21293 24000
PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 8234600 24000
165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 5850 64390
145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 68717 40349
SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 132655 28776
SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 144686 38567
MUNDRA UMPPCOASTAL GUJARAT POWER
LTD THERMAL-IMP COAL 400000 2530300
23900
LANCO AMARKANTAK TPP PATHADIH
U-ILANCO AMARKAN POWER LTD THERMAL-COAL 30000 195500
29200
LANCO AMARKANTAK TPP PATHADIH
U-IILANCO AMARKAN POWER LTD THERMAL-COAL 30000 206900
27600
BARADARHA TPS D B POWER LTD THERMAL-COAL 120000 677373 29200
JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 405000 28900
JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 453000 40500
DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 339437 40700
TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 293400 44000
TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 137200 37000
TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 174900 44000
BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 92900 14100
BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23700 34300
KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 27600 48300
CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2530300 23900
BHANDARDRA HEP -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 2475 54900
SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 161400 26500
SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 445000 39000
SOTHERN REGION
CENTRAL SECTOR
NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 325699 54820
NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 305532 39880
NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 998805 38510
NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 113016 54070
NEYVELI TAMILNADU POWER LTD JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 625274 42200
VALLUR TPS NTPC TECL THERMAL-COAL 150000 856438 42350
R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 1493 84300
RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1502919 29400
RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 341291 31800
SIMHADRI I NTPC LTD THERMAL-COAL 100000 688382 36800
SIMHADRI II NTPC LTD THERMAL-COAL 100000 663657 43400
KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 593110 31324
MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 291625 21764
KKNPP-1 amp 2 NPCIL NUCLEAR-NUCLEAR 200000 572609 40948
MINICOY LAKSHADEEP THERMAL-DIESEL 340 770 29600
KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1097 29600
AMINI LAKSHADEEP THERMAL-DIESEL 265 509 29600
ANDROTT LAKSHADEEP THERMAL-DIESEL 219 524 29600
KALPENI LAKSHADEEP THERMAL-DIESEL 175 356 29600
AGATTI LAKSHADEEP THERMAL-DIESEL 195 658 29600
KADMAT LAKSHADEEP THERMAL-DIESEL 190 414 29600
KILTAN LAKSHADEEP THERMAL-DIESEL 150 269 29600
CHETLET LAKSHADEEP THERMAL-DIESEL 100 139 29600
BITRA LAKSHADEEP THERMAL-DIESEL 043 024 29600
BANGARAM LAKSHADEEP THERMAL-DIESEL 018 009 29600
Page 37
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) STATE SECTOR
Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 721811 46500
Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 50000 336142 46500
RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 237358 46500
RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 239926 46500
RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 124500 46500
SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 62109 46500
UPPER SILERU APGENCO HYDRO-HYDRO 24000 33000 46500
LOWER SILERU APGENCO HYDRO-HYDRO 46000 81066 46500
DONKARAI APGENCO HYDRO-HYDRO 2500 6007 46500
PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 1262 46500
CHETTIPETA APGENCO HYDRO-HYDRO 100 214 46500
MUCHKUND APGENCO HYDRO-HYDRO 12000 37571 46500
NAGARJUNASAGAR RCPH APGENCO HYDRO-HYDRO 9000 606 46500
TUNGABHADRA HES amp HAMPI(AP
Share)
APGENCO HYDRO-HYDRO 7200 6100 46500
KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 352232 42600
KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 288131 32500
KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 319272 46500
RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 40073 44300
KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 308317 46000
KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 308963 51300
SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 61004 76600
NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 17960 75300
PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 20873 58300
POCHAMPAD-I TSPGENCO HYDRO-HYDRO 2700 5455 29800
POCHAMPAD-II TSPGENCO HYDRO-HYDRO 900 1932 40700
NIZAMSAGAR TSPGENCO HYDRO-HYDRO 1000 1126 53400
RAICHUR TPS 1 to 7 KPCL THERMAL-COAL 147000 890866 43800
RAICHUR TPS 8 KPCL THERMAL-COAL 25000 159523 48200
BELLARI TPS 1 KPCL THERMAL-COAL 50000 318679 51100
BELLARI TPS 2 KPCL THERMAL-COAL 50000 232347 55600
BELLARI TPS 3 KPCL THERMAL-COAL 70000 47565 34400
BHADRA PH KPCL HYDRO-HYDRO 3920 2369 45900
GERUSUPPA PH KPCL HYDRO-HYDRO 24000 26990 22000
GHAT PRABHA HEP KPCL HYDRO-HYDRO 3200 4777 25300
KADRA HPS KPCL HYDRO-HYDRO 15000 16889 26800
NAGJHARI KPCL HYDRO-HYDRO 90000 155159 9800
KODASALLI DPH KPCL HYDRO-HYDRO 12000 14854 19200
MUNIRA+MGH+SPH+SPH KPCL HYDRO-HYDRO 22640 48211 7900
SHARAVATHY HPS KPCL HYDRO-HYDRO 108550 276215 5400
ALMATTI DPH KPCL HYDRO-HYDRO 29000 39611 24600
VARAHI UGPH KPCL HYDRO-HYDRO 46000 71368 15600
IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 17196 15300
IDUKKI HPS KSEB HYDRO-HYDRO 78000 137905 15300
KAKKAD HPS KSEB HYDRO-HYDRO 5000 13063 15300
KALLADA HPS KSEB HYDRO-HYDRO 1500 4436 15300
KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 46544 15300
KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 635 15300
LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 30822 15300
MALANKARA HPS KSEB HYDRO-HYDRO 1050 2474 15300
MATTUPETTY KSEB HYDRO-HYDRO 200 230 15300
MALAMPUZHA KSEB HYDRO-HYDRO 250 063 15300
CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 864 15300
URUMI ST I amp II KSEB HYDRO-HYDRO 615 903 15300
LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 248 15300
NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7765 19625 15300
PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 16601 15300
PANNIAR HPS KSEB HYDRO-HYDRO 3240 6217 15300
PORINGALKUTHU KSEB HYDRO-HYDRO 3600 10052 15300
PORINGALKUTHU LBE KSEB HYDRO-HYDRO 1600 9438 15300
PEPPARA KSEB HYDRO-HYDRO 300 395 15300
POOZHITHODE KSEB HYDRO-HYDRO 480 1045 15300
Page 38
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) PEECHI KSEB HYDRO-HYDRO 125 040 15300
RANI-PERUNADU KSEB HYDRO-HYDRO 400 585 15300
SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 79783 15300
SENGULAM HPS KSEB HYDRO-HYDRO 5120 11558 15300
SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 16711 15300
VILANGAD KSEB HYDRO-HYDRO 750 1578 15300
BARAPOLE KSEB HYDRO-HYDRO 1500 1932 15300
VELLATHOOVAL KSEB HYDRO-HYDRO 360 305 15300
CHIM0NY KSEB HYDRO-HYDRO 250 156 15300
ADYANPARA KSEB HYDRO-HYDRO 350 501 15300
BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 554 15300
KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 3801 15300
KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 23132 32800
ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 14416 62280
METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 523970 62280
METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 321270 62280
NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 336575 62280
NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 591240 62280
TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 508966 62280
KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 30897 62280
VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 18720 90699 62280
KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 33593 62280
BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 1047 62280
PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 1250 62280
PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 330 62280
MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 4897 62280
MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 032 62280
KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15681 62280
KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 40608 62280
KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 21342 62280
KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 4717 62280
KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4322 62280
KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2399 62280
METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 4416 62280
METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 8035 62280
BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2187 62280
BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2359 62280
BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2511 62280
BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 1949 62280
BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 1819 62280
POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 172 62280
SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 241 62280
MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 026 62280
THIRUMOORTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 136 62280
PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 9309 62280
VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 353 62280
SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 4192 62280
PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 6571 62280
SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 1186 62280
SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6319 62280
ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 6122 62280
KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 28674 62280
SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 18381 62280
SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 4258 62280
KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 12680 62280
KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4201 62280
ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 000 62280
PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 19175 62280
AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 078 62280
BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 504 62280
BHAVANI KATTALAI (BKB)(IIIampIII BB I amp II)TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 5847 62280
PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 000 62280
Page 39
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) SRI DAMODARAM STPS APPDCL THERMAL-COAL 160000 808108 36300
PRIVATE SECTOR
KARUPPUR TANJORE LANCO TANJORE PCL THERMAL-GAS 12000 48096 28770
SIMHAPURI ENERGY LTD SIMHAPURI ENERGY LTD THERMAL-COAL 60000 143900 39100
JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 7111 45500
SBU 1 JSW ENERGY LTD
VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 26000 159100
43300
SBU 2 JSW ENERGY LTD
VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 60000 247900
42800
LANCO KPLLANCO KONDAPALLI POWER
LTDTHERMAL-GAS 36814 85060
25776
LANCO KPL STG -IILANCO KONDAPALLI POWER
LTDTHERMAL-GAS 36600 12979
46330
LANCO KPL STG -IIIALANCO KONDAPALLI POWER
LTDTHERMAL-GAS 37100 85710
46330
LANCO KPL STG -III BLANCO KONDAPALLI POWER
LTDTHERMAL-GAS 37100 43639
46330
HINDUJA NATIONAL PCL HINDUJA NATIONAL PCL THERMAL-COAL 104000 303000 38200
MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 121164 49940
UDUPI POWER COR LTD ADANI POWER LTD THERMAL-COAL 120000 754613 42500
SPECTRUM POWER GENERATION
LTD SPECTRUM PG LTD THERMAL-GASN 20525 9256812
34952
TAQA NEYVELI POWER COM PVT
LTD TAQA NEYVELI THERMAL-LIG 25000 5840
34500
ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 251000 51000
ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 207860 36800
GMR VEMAGIRI POWER GENERATION
LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 30117
46450
EASTERN REGION
CENTRAL SECTOR
MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 64675 53113
MTPS STAGE - II KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 39000 1432 69138
BOKARO `B` TPS DVC THERMAL-COAL 63000 145670 31539
MEJIA TPS U 1-3 DVC THERMAL-COAL 63000 348298 31552
MEJIA TPS U 4 DVC THERMAL-COAL 21000 116099 34997
MEJIA TPS U 5-6 DVC THERMAL-COAL 50000 276427 35976
MEJIA TPS U 7-8 DVC THERMAL-COAL 100000 552854 36991
DURGAPUR STEEL TPS DVC THERMAL-COAL 100000 665550 39323
DURGAPUR TPS DVC THERMAL-COAL 21000 59270 35416
RAGHUNATHPUR TPS DVC THERMAL-COAL 120000 201650 35326
MAITHON HYDEL STA DVC HYDRO-HYDRO 6320 12200 17984
CHANDRAPURA TPSU1-3 DVC THERMAL-COAL 42000 257610 35095
CHANDRAPURA TPSU7-8 DVC THERMAL-COAL 50000 306673 34987
KODERMA TPS DVC THERMAL-COAL 100000 380180 38131
PANCHET HPS DVC HYDRO-HYDRO 8000 13360 17984
TILLAYA HPS DVC HYDRO-HYDRO 400 1410 17984
RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34700 35400
TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 277300 23200
TLDP -III NHPC LTD HYDRO-HYDRO 13200 55400 62000
TLDP -IV NHPC LTD HYDRO-HYDRO 16000 60300 25600
FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 957219 33700
FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 308943 41000
BONGAINGAON TPS NTPC LTD THERMAL-COAL 25000 153663 58600
KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 542277 34200
KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 942591 34200
BARH-II NTPC LTD THERMAL-COAL 132000 728021 44500
TALCHER TPS NTPC LTD THERMAL-COAL 46000 335521 30100
TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 702319 25600
TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1436521 24700
STATE SECTOR
BTPS(RampM) BIHAR STATE PGCL THERMAL-COAL 22000 12142 39700
BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 98331 10602
HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 50593 9482
CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 19689 2605
RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 53192 6033
UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 147208 14637
Page 40
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 60353 4519
IB TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 288567 25000
J P H GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 210 038 61100
MEYONG CHU GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 400 1086 61100
TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 122667 38200
DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 214339 43321
KOLAGHAT THERMAL POWER
STATION
WEST BENGAL PDCL THERMAL-COAL 126000 538269 31603
BAKRESHWAR THERMAL POWER
PLANT
WEST BENGAL PDCL THERMAL-COAL 105000 634876 32154
BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 45000 166855 33299
SANTHALDIH THERMAL POWER
STATION
WEST BENGAL PDCL THERMAL-COAL 50000 336442 34932
SAGARDIGHI THERMAL POWER
PROJECT
WEST BENGAL PDCL THERMAL-COAL 160000 423121 34705
JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 20344 68900
RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 24559 68900
TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 4623 68900
PURULIA PUMPED STORAGE
PROJECT
WEST BENGAL SEDCL HYDRO-HYDRO 90000 108816 68900
MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2768 68900
PRIVATE SECTOR
CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 49474 20230
CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 555500 70200
HALDIA ENERGY HALDIA ENERGY LTD THERMAL-COAL 60000 371000 50400
DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3688 63400
KAMALANGA TPS GMR KAMALANGA ENERGY LTD THERMAL-COAL 105000547670
33300
ADHUNIK POWER U-1 ADHUNIK POWER THERMAL-COAL 27000 158 44060
ADHUNIK POWER U-2 ADHUNIK POWER THERMAL-COAL 27000 168 44250
VL-JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 332800 23622
JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 43000 45250
JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 71700 37030
JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 70700 35920
JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 71100 38870
JOJOBERA UNIT 5 TATA POWER COM LTD THERMAL-COAL 12000 79300 44560
JOJOBERA UNIT 6 TATA POWER COM LTD THERMAL-WHR 12000 83700 12840
IEL KALINGANAGAR U-I TATA POWER COM LTD THERMAL-WG 6750 33400 22500
IEL KALINGANAGAR U-II TATA POWER COM LTD THERMAL-WG 6750 34800 22500
MAITHON UNIT 1 amp 2 TATA POWER COM LTD THERMAL-COAL 105000 678000 36100
HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 27500 24340
HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 28400 24340
HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 15800 24310
NORTH EASTERN REGION
CENTRAL SECTOR
LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 74100 36600
AGARTALA GT NEEPCO THERMAL-GAS 13500 88611 27210
ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 153111 32310
DOYANG HEP NEEPCO HYDRO-HYDRO 7500 25598 49801
KOPILI HEP NEEPCO HYDRO-HYDRO 20000 98186 11491
KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 19582 20237
KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 10310 17968
RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 124093 22945
TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 10100 17344 39000
STATE SECTOR
HYDRO POWER (122 Stns) ITANAGAR GOVT OF ARUNACHAL
PRADESHHYDRO-HYDRO 6971 6217270
24600
KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39514 17337
LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 82327 36810
NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 33318 48290
MYNTRIANG SHEP ST II ASSAM POWER GENCO HYDRO-HYDRO 300 567 35776
LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 9130 49200
LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 012 49200
DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 022 49200
TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 000 49200
UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 4990 16000
UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 6476 37000
UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 16494 14600
UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 3600 9556 15000
SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 758 8000
MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44070 44800
KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 154 41400
TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 091 41400
MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 411 41400
MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 394 41400
KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 760 41400
SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 3264 41400
LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 044 41400
BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 18953 28000
ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 43585 28200
GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 4080 11100
Note
LIG Lignite N Naptha WHR Waste Heat Recovery
Page 41
File NoCEA-CH-14-1142018-Coordination Division
Oct-2017 Oct-2018 Oct-2017 Oct-2018 Oct-2017 Oct-2018
Northern 31786 31822 31096 31375 -22 -14
Western 31728 36308 31628 36178 -03 -04
Southern 24314 29392 24271 29342 -02 -02
Eastern 12012 12547 11931 12507 -07 -03
North Eastern 1487 1387 1451 1351 -24 -25
All India 101327 111455 100377 110753 -09 -06
Oct-2017 Oct-2018 Oct-2017 Oct-2018 Oct-2017 Oct-2018
Northern 51307 50659 50289 49635 -20 -20
Western 48530 56548 46392 55695 -44 -15
Southern 39142 45279 38905 45226 -06 -01
Eastern 19850 22959 19836 22567 -01 -17
North Eastern 2596 2790 2499 2700 -37 -32
All India 162027 172945 157394 170604 -29 -14
Oct-2018 Figures are Provisional
7
8 Power Supply Position (Energy amp Peak) in Oct-2018
Peak Demand Peak Met
Requirement Availability
Energy (MU)Region
Surplus(+)
Deficit (-) in
Surplus(+)
Deficit (-) in Region
Power (MW)
File NoCEA-CH-14-1142018-Coordination Division
Chandigarh Delhi Haryana HP JampK Punjab Rajasthan UP Utrakhand Oct-2017 0 0 0 0 516 0 0 0 0
Oct-2018 0 0 0 0 567 0 0 688 0
Chattisgarh Gujarat MP Maharastra Daman amp Diu Dadar Nagar Goa
Oct-2017 16 0 13 2062 0 0 25
Oct-2018 146 19 39 705 1 4 0
AP Telangana Karnataka Kerala Tamil Nadu Puducherry Lakshadweep
Oct-2017 18 19 0 211 38 2 0
Oct-2018 0 0 0 83 414 1 0
8
9 Peak Shortage of Power Supply (MW) in Different Regions in Oct-2018
0 0 0 0
567
0 0
688
00 0 0 0
516
0 0 0 0
0
400
800
Chan
dig
ar
h
Delh
i
Hary
ana
HP
Jamp
K
Pu
nj
ab
Raja
sth
an
UP
Utr
ak
hand
MW
Northern States (MW) Oct-2018 Oct-2017
146
19
39 705
1 4 016
0 13
2062
0 0 25
0
5000
Ch
attis
garh
Guja
rat
MP
Mah
ara
st
ra
Da
man amp
Diu
Da
dar
Na
gar G
oaM
W
Western States (MW) Oct-2018 Oct-2017
0 0 083
414
1 018 19 0
211
38 2 00
500
AP Telangana Karnataka Kerala Tamil Nadu Puducherry Lakshadweep
Southern State (MW) Oct-2018 Oct-2017
File NoCEA-CH-14-1142018-Coordination Division
Bihar DVC Jharkhand Odisha West Bengal Sikkim AampN Island
Oct-2017 6 0 0 0 8 0 4
Oct-2018 0 0 0 400 0 0 4
Arunachal Assam Manipur Meghalaya Mizoram Nagaland Tripura
Oct-2017 6 77 4 0 2 2 12
Oct-2018 13 81 2 0 2 3 0
9
0 0 0
400
0 0 46 0 0 0 8 0 4
0100200300400500
Bih
ar
DV
C
Jha
rkh
an
d
Od
ish
a
We
st
Be
ng
al
Sik
kim
Aamp
NIs
land
MW
Eastern States (MW) Oct-2018 Oct-2017
13
81
2 0 2 3 06 4 0 2 2
12
0
100
Aru
na
ch
al
Assa
m
Ma
nip
ur
Meghal
aya
Miz
ora
m
Na
gala
nd
Trip
ura
MW
North-Eastern States (MW)
File NoCEA-CH-14-1142018-Coordination Division
Sector Oct-2017 Oct-2018
Central 6872 7355
State 5217 6078
Private 6045 6819
ALL INDIA 5882 6524
Month PLF 2017 PLF 2018
Jan 6014 6288
Feb 6153 6285
March 6313 6558
April 6493 6458
May 6355 6554
June 5672 5917
July 537 5545
Aug 5733 5639
Sep 5989 6109
Oct 5882 6524
For Coal and Lignite based Power Plants and Provisional based on Actual-Cum-Assesment
10
PLF of Thermal Power Plants
All India PLF of Thermal Plants (Excluding Gas Based Plants) Month-wise
10 All India PLF Sector-wise for Oct-2018
68
72
52
17
60
45
58
8273
55
60
78
68
19
65
24
000
1000
2000
3000
4000
5000
6000
7000
8000
Central State Private ALL INDIA
P
LF
Oct-2017 Oct-2018
0
10
20
30
40
50
60
70
Jan Feb March April May June July Aug Sep Oct
Months
All India PLF Month-wise
PLF 2017 PLF 2018
File NoCEA-CH-14-1142018-Coordination Division
2012-13 2013-14 2014-15 2015-16 2016-17
TampD Losses 2304 2284 2277 2181 2142
ATampC Losses 2548 2258 2462
Note As per PFC for utilities selling directly to consumers
Total Number of Villages
597464
Note From the year 2004-05 onwards Definition of Village Electrification-
A village would be declared Electrified if
Without
Subsidy
Gap ACS-
ARR(
Without
Subsidy)
Paiseunit
Gap ACS-
ARR (on
subsidy
booked
basis)
paiseunit
Gap ACS-
ARR (on
subsidyrece
ived basis)
paiseunit
2013-14 400 118 76 77
2014-15 412 108 58 60
Source- PFC Reports on the performance of State Power Utilities
2013-14 4894
2014-15 5304
2015-16 5459
2016-17 5743
2017-18 6080
11
Average cost of supply(ACS)
(paiseunit)
i) Basic Infrastructure such as Distribution Transformer and Distribution lines are provided in the inhabited locality
as well as Dalit Basti hemlet where it exists (For electrification through Non-Conventional Energy Sources a
Distribution Transformer may not be necessary)
14 All India Coal consumption for Power Generation (MT)
520
Average Revenue Realization(paiseunit)
518
Year
ii) Electricity is provided to Public places like Schools Panchayat Office Health Centre Dispensaries Community
Centres etc and
iv) Mandatory Certification from Gram Panchayat regarding the completion of village electrification should be
obtained
13 Average cost of Power amp Average Realisation
iii) The number of households electrified should be at least 10 of the total number of households in the village
11 T amp D and ATampC Losses ()
12 All India Village Electrification
Villiages Electrified (Nos)
10000All villages as per census 2011 has
been electrified on 28042018
Villages electrified
File NoCEA-CH-14-1142018-Coordination Division
SN Contents Page
1 Capacity Addition Targets and Achievements in 12th Plan 12
2 Capacity Addition Targets amp Achievements during Oct-2018 and April 2018- Oct 2018 13
3 Installed Capacity in various Regions including their shares 14-19
Section B - Capacity Addition
File NoCEA-CH-14-1142018-Coordination Division
Figures in MW
TARGET ACH TARGET ACH TARGET ACH TARGET ACH
CENTRAL 14878 15869 6004 2584 5300 2000 26182 20453
STATE 13922 22201 1608 2276 0 0 15530 24477
PRIVATE 43540 53661 3285 619 0 0 46825 54280
ALL INDIA 72340 91730 10897 5479 5300 2000 88537 99209
Figures in MW
Thermal Hydro Nuclear Total
Target Ach Target Ach Target Ach Target Ach
Central 4880 3170 800 390 500 6180 3560 5761
State 3546 1760 300 200 0 3846 1960 5096
Private 2940 3780 205 205 0 3145 3985 12671
Total 11366 8710 1305 795 500 0 13171 9505 7217
12
2 CAPACITY ADDITION TARGET AND ACHIEVEMENT FOR 2017-18 (IN MW)
1 Capacity Addtion Targets and Achievements in the 12th Plan
SECTORTHERMAL HYDRO NUCLEAR TOTAL
File NoCEA-CH-14-1142018-Coordination Division
(MW)
Cummulative
Deviation
Target Achievement Target Achievement (+) (-)
Central 2760 250 0 250 0 -250
State 450615 1030 0 1030 69755 -960245
Private 0 0 600 0 600 600
Total 726615 1280 600 1280 669755 -610245
Central 710 0 0 110 110 0
State 130 0 0 12999 30 -9999
Private 0 0 0 0 0 0
Total 840 0 0 23999 140 -9999
Nuclear Central 0 0 0 0 0 0
Central 3470 250 0 360 110 -250
State 463615 1030 0 115999 99755 -1060235
Private 0 0 600 0 600 600
Total 810615 1280 600 151999 809755 -710235
Electricity Generation (MU) Targets and Achievements for 2016-17
13
2 Capacity Addition Targets Achievements During Oct-2018
Schemes Sector
Target 2018-19
April 2018- Oct 2018Oct-18
Hydro
All India
Capacity Addition TargetsAchievements during the Month of Oct-2018
Thermal
12
80
24
0
0
15
20
67
0
14
0
0
81
0
0
200
400
600
800
1000
1200
1400
1600
Thermal Hydro Nuclear Total
MW
Targets and Achievement during 2018-19Target Achievement
600
0 00 0
600
0
100
200
300
400
500
600
700
800
900
1000
Target Achievement
MW
Targets and Achievement during Oct 2018Thermal Hydro
Nuclear Total
File NoCEA-CH-14-1142018-Coordination Division
Coal Gas Diesel Total
State 1593400 287920 000 1881320 000 869755 68956 2820031
Private 2276083 55800 000 2331883 000 251400 1261535 3844818
Central 1258537 234406 000 1492943 162000 849622 32900 2537465
Sub Total 5128020 578126 000 5706146 162000 1970777 1363391 9202314
State 2128000 284982 000 2412982 000 544650 31119 2988751
Private 3488567 467600 000 3956167 000 48100 2005170 6009437
Central 1504295 328067 000 1832362 184000 162000 66130 2244492
Sub Total 7120862 1080649 000 8201511 184000 754750 2102418 11242679
State 1943250 79198 28788 2051236 000 1183803 52102 3287141
Private 1212450 532210 47370 1792030 000 000 3495815 5287845
Central 1422502 35958 000 1458460 332000 000 49190 1839650
Sub Total 4578202 647366 76158 5301726 332000 1183803 3597107 10414636
State 695000 10000 000 705000 000 353792 22511 1081303
Private 637500 000 000 637500 000 39900 84853 762253
Central 1387664 000 000 1387664 000 100520 1000 1489184
Sub Total 2720164 10000 000 2730164 000 494212 108364 3332740
State 000 49771 3600 53371 000 42200 25674 121245
Private 000 2450 000 2450 000 000 2571 5021
Central 52002 125360 000 177362 000 103000 500 280862
Sub Total 52002 177581 3600 233183 000 145200 28745 407128
State 000 000 4005 4005 000 000 525 4530
Private 000 000 000 000 000 000 221 221
Central 000 000 000 000 000 000 510 510
Sub Total 000 000 4005 4005 000 000 1256 5261
State 6359650 711871 36393 7107913 000 2994200 200887 10303000
Private 7614600 1058060 47370 8720030 000 339400 6850164 15909594
Central 5625000 723791 000 6348791 678000 1215142 150230 8392163
Total 19599250 2493722 83763 22176734 678000 4548742 7201281 34604757
Figures at decimal may not tally due to rounding off
Note -
(As per latest information available with MNRE)
Break up of RES all India as on 30092018 is given below (in MW)
450695 3461510 2402166 7201281
A Oct 2018 669755 MW
B Capacity Retired
during
Oct 2018 705 MW
C Oct 2018 0 MW
D Oct 2018 A-B+C -35245 MW
Share of Telangana from JEGURUPADU CCPP Ph II has been removed and the same has been added to private sector of Andhra Pradesh due to expiry of PPA as per
request from TS Transco
Region
ALL INDIA INSTALLED CAPACITY (IN MW) OF POWER STATIONS (As on 31102018)
(UTILITIES)
Net Capacity Added during
1 RES include SHP BP UampI Solar and Wind Energy Installed capacity in respect of RES (MNRE) as on 30092018
Small
Hydro PowerWind Power
Bio-PowerSolar Power
Total
CapacityBM PowerCogen Waste to Energy
2 U-1 to 7 (76995=69755 MW) of LAKWA REPLACEMENT POWER PROJECT commissioned in April 2018 but intimated in October 2018
has been added to state sector of Assam
1 Badarpur TPS (705 MW) has been retired from central sector of Northern Region
Capacity Up-rated
Ownership Sector
873080 13830
Capacity Added during
1 U-2 (600 MW) of MAHAN TPP has been commissioned and added to private sector of Madhya Pradesh
Grand TotalThermalNuclear Hydro
Islands
ALL INDIA
Abbreviation- SHP=Small Hydro Project (le 25 MW) BP=Biomass Power UampI=Urban amp Industrial Waste Power RES=Renewable Energy Sources
Northern Region
Western Region
Southern Region
Eastern Region
North Eastern
Region
RES
(MNRE)
Modewise breakup
File NoCEA-CH-14-1142018-Coordination Division
Coal Gas Diesel Total
State 13500 180040 000 193540 000 000 000 193540
Private 86922 10800 000 97722 000 000 12157 109879
Central 311272 20701 000 331973 10283 72309 000 414565
Sub-Total 411694 211541 000 623235 10283 72309 12157 717984
State 272000 15000 000 287000 000 110282 5930 403212
Private 408078 000 000 408078 000 20000 34745 462823
Central 129472 53561 000 183034 10094 66370181 500 259998
Sub-Total 809550 68561 000 878112 10094 196652 41175 1126032
State 000 000 000 000 000 69460 25661 95121
Private 000 000 000 000 000 99200 60536 159736
Central 18340 6201 000 24541 2895 122388 000 149824
Sub-Total 18340 6201 000 24541 2895 291048 86197 404681
State 000 17500 000 17500 000 123000 12903 153403
Private 000 000 000 000 000 000 5985 5985
Central 50639 12907 000 63547 6798 109188 000 179533
Sub-Total 50639 30407 000 81047 6798 232188 18888 338921
State 176000 15000 000 191000 000 259770 12780 463550
Private 511550 000 000 511550 000 28800 115462 655812
Central 85458 26401 000 111859 19681 92342 000 223882
Sub-Total 773008 41401 000 814409 19681 380912 128242 1343244
State 585000 60380 000 645380 000 109618 2385 757383
Private 388200 000 000 388200 000 10400 710680 1109280
Central 120625 22110 000 142735 55674 73901 29400 301710
Sub-Total 1093825 82490 000 1176315 55674 193919 742465 2168373
State 546900 000 000 546900 000 72410 2510 621820
Private 871433 000 000 871433 000 84200 266691 1222324
Central 379639 54949 000 434588 28948 180253 3000 646789
Sub-Total 1797972 54949 000 1852921 28948 336863 272201 2490933
State 000 000 000 000 000 125215 6787 132002
Private 9900 45000 000 54900 000 8800 52244 115944
Central 34324 6966 000 41290 3124 47554 000 91968
Sub-Total 44224 51966 000 96190 3124 181569 59031 339914
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 3035 3035
Central 3815 1503 000 5317 801 10171 000 16289
Sub-Total 3815 1503 000 5317 801 10171 3035 19324
124953 29105 000 154058 23703 75145 000 252907
State 1593400 287920 000 1881320 000 869755 68956 2820031
Private 2276083 55800 000 2331883 000 251400 1261535 3844818
Central 1258537 234406 000 1492943 162000 849622 32900 2537465
Grand Total 5128020 578126 000 5706146 162000 1970777 1363391 9202314
Uttar Pradesh
Uttarakhand
Chandigarh
Grand TotalThermalNuclear
Hydro
(Renewable)
RES
(MNRE)
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
NORTHERN REGION
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
(As on 31102018)
Central - Unallocated
Total (Northern
Region)
Delhi
Haryana
Himachal Pradesh
Jammu amp Kashmir
Punjab
Rajasthan
State Ownership Sector
Modewise breakup
File NoCEA-CH-14-1142018-Coordination Division
(As on 31102018)
Coal Gas Diesel Total
State 000 000 000 000 000 000 005 005
Private 000 4800 000 4800 000 000 091 4891
Central 45478 1967 000 47445 2600 000 000 50045
Sub-Total 45478 6767 000 52245 2600 000 096 54941
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 1301 1301
Central 12663 4334 000 16997 700 000 000 17697
Sub-Total 12663 4334 000 16997 700 000 1301 18998
State 475000 217782 000 692782 000 77200 800 770782
Private 776567 396000 000 1172567 000 000 729782 1902349
Central 309051 42400 000 351451 55900 000 23830 431181
Sub-Total 1560618 656182 000 2216800 55900 77200 754412 3104312
State 408000 000 000 408000 000 170366 8396 586762
Private 617400 10000 000 627400 000 000 378205 1005605
Central 279441 25700 000 305141 27300 152000 30000 514441
Sub-Total 1304841 35700 000 1340541 27300 322366 416601 2106808
State 228000 000 000 228000 000 12000 1105 241105
Private 849000 000 000 849000 000 000 52430 901430
Central 195344 000 000 195344 4800 10000 000 210144
Sub-Total 1272344 000 000 1272344 4800 22000 53535 1352679
State 1017000 67200 000 1084200 000 285084 20813 1390097
Private 1245600 56800 000 1302400 000 48100 842815 2193315
Central 433475 227273 000 660748 69000 000 12300 742048
Sub-Total 2696075 351273 000 3047348 69000 333184 875927 4325459
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 546 546
Central 17444 6634 000 24078 900 000 000 24978
Sub-Total 17444 6634 000 24078 900 000 546 25524
211400 19759 000 231159 22800 000 000 253959
State 2128000 284982 000 2412982 000 544650 31119 2988751
Private 3488567 467600 000 3956167 000 48100 2005170 6009437
Central 1504295 328067 000 1832362 184000 162000 66130 2244492
Grand Total 7120862 1080649 000 8201511 184000 754750 2102418 11242679
Central - Unallocated
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
WESTERN REGION
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
State Ownership Sector
Modewise breakup
Grand TotalThermalNuclear
Hydro
(Renewable)
RES
(MNRE)
Total (Western
Region)
Goa
Daman amp Diu
Gujarat
Madhya Pradesh
Chhattisgarh
Maharashtra
Dadra amp Nagar
Naveli
File NoCEA-CH-14-1142018-Coordination Division
(As on 31102018)
Coal Gas Diesel Total
State 501000 23540 000 524540 000 167360 4875 696775
Private 387388 381318 3680 772386 000 000 693073 1465459
Central 167456 000 000 167456 12727 000 25000 205183
Sub-Total 1055844 404858 3680 1464382 12727 167360 722948 2367417
State 508250 000 000 508250 000 247993 4022 760265
Private 83945 83182 000 167127 000 000 375048 542175
Central 195612 000 000 195612 14873 000 1000 211485
Sub-Total 787807 83182 000 870989 14873 247993 380070 1513925
State 502000 000 12792 514792 000 359980 15533 890305
Private 195850 000 2520 198370 000 000 1275640 1474010
Central 282920 000 000 282920 69800 000 000 352720
Sub-Total 980770 000 15312 996082 69800 359980 1291173 2717035
State 000 000 15996 15996 000 188150 15402 219548
Private 61500 17400 000 78900 000 000 20899 99799
Central 114322 35958 000 150280 36200 000 5000 191480
Sub-Total 175822 53358 15996 245176 36200 188150 41301 510827
State 432000 52408 000 484408 000 220320 12270 716998
Private 483767 50310 41170 575247 000 000 1130984 1706231
Central 448952 000 000 448952 144800 000 18190 611942
Sub-Total 1364719 102718 41170 1508607 144800 220320 1161444 3035171
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 000 000
Central 10000 000 000 10000 000 000 000 10000
Sub-Total 10000 000 000 10000 000 000 000 10000
State 000 3250 000 3250 000 000 000 3250
Private 000 000 000 000 000 000 171 171
Central 24840 000 000 24840 8600 000 000 33440
Sub-Total 24840 3250 000 28090 8600 000 171 36861
178400 000 000 178400 45000 000 000 223400
State 1943250 79198 28788 2051236 000 1183803 52102 3287141
Private 1212450 532210 47370 1792030 000 000 3495815 5287845
Central 1422502 35958 000 1458460 332000 000 49190 1839650
Grand Total 4578202 647366 76158 5301726 332000 1183803 3597107 10414636
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
SOUTHERN REGION
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
State Ownership Sector
Modewise breakup
Grand TotalThermal RES
(MNRE)Nuclear
Hydro
(Renewable)
Kerala
Tamil Nadu
NLC
Puducherry
Central - Unallocated
Total (Southern
Region)
Andhra Pradesh
Telangana
Karnataka
File NoCEA-CH-14-1142018-Coordination Division
(As on 31102018)
Coal Gas Diesel Total
State 71000 000 000 71000 000 000 7070 78070
Private 28100 000 000 28100 000 000 25545 53645
Central 291433 000 000 291433 000 11000 000 302432
Sub-Total 390533 000 000 390533 000 11000 32615 434147
State 42000 000 000 42000 000 13000 405 55405
Private 73000 000 000 73000 000 000 3207 76207
Central 39374 000 000 39374 000 6100 000 45474
Sub-Total 154374 000 000 154374 000 19100 3612 177086
State 540000 10000 000 550000 000 98600 9195 657795
Private 242500 000 000 242500 000 000 34452 276952
Central 76077 000 000 76077 000 41000 000 117077
Sub-Total 858577 10000 000 868577 000 139600 43647 1051824
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 000 000
Central 698504 000 000 698504 000 18620 000 717124
Sub-Total 698504 000 000 698504 000 18620 000 717124
State 42000 000 000 42000 000 206192 630 248822
Private 293900 000 000 293900 000 000 21648 315548
Central 163390 000 000 163390 000 8900 1000 173290
Sub-Total 499290 000 000 499290 000 215092 23278 737660
State 000 000 000 000 000 36000 5211 41211
Private 000 000 000 000 000 39900 001 39901
Central 8703 000 000 8703 000 6400 000 15103
Sub-Total 8703 000 000 8703 000 82300 5212 96215
110183 000 000 110183 000 8501 000 118684
State 695000 10000 000 705000 000 353792 22511 1081303
Private 637500 000 000 637500 000 39900 84853 762253
Central 1387664 000 000 1387664 000 100520 1000 1489184
Grand Total 2720164 10000 000 2730164 000 494212 108364 3332740
(As on 31102018)
Coal Gas Diesel Total
State 000 32821 000 32821 000 10000 3001 45822
Private 000 2450 000 2450 000 000 1680 4130
Central 27902 43556 000 71458 000 36851 000 108309
Sub-Total 27902 78827 000 106729 000 46851 4681 158261
State 000 000 000 000 000 000 10710 10710
Private 000 000 000 000 000 000 539 539
Central 2470 4682 000 7152 000 11800 000 18952
Sub-Total 2470 4682 000 7152 000 11800 11249 30201
State 000 000 000 000 000 32200 3103 35303
Private 000 000 000 000 000 000 006 006
Central 3040 10969 000 14009 000 7446 000 21455
Sub-Total 3040 10969 000 14009 000 39646 3109 56764
State 000 16950 000 16950 000 000 1601 18551
Private 000 000 000 000 000 000 009 009
Central 3740 43695 000 47435 000 7077 500 55012
Sub-Total 3740 60645 000 64385 000 7077 2110 73572
State 000 000 3600 3600 000 000 545 4145
Private 000 000 000 000 000 000 217 217
Central 3140 7157 000 10297 000 9677 000 19974
Sub-Total 3140 7157 3600 13897 000 9677 762 24336
State 000 000 000 000 000 000 3067 3067
Private 000 000 000 000 000 000 100 100
Central 2140 4893 000 7033 000 5860 000 12893
Sub-Total 2140 4893 000 7033 000 5860 3167 16060
State 000 000 000 000 000 000 3647 3647
Private 000 000 000 000 000 000 020 020
Central 2070 4046 000 6116 000 9913 000 16029
Sub-Total 2070 4046 000 6116 000 9913 3667 19696
7500 6362 000 13862 000 14376 000 28238
State 000 49771 3600 53371 000 42200 25674 121245
Private 000 2450 000 2450 000 000 2571 5021
Central 52002 125360 000 177362 000 103000 500 280862
Grand Total 52002 177581 3600 233183 000 145200 28745 407128
Central - Unallocated
Total (Eastern
Region)
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
NORTH-EASTERN REGION
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
State Ownership Sector
Modewise breakup
Grand TotalThermalNuclear
Bihar
Jharkhand
West Bengal
DVC
Odisha
Sikkim
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
EASTERN REGION
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
Ownership Sector
Modewise breakup
Grand TotalThermalNuclear
Hydro
(Renewable)
RES
(MNRE)
Manipur
Nagaland
State
Mizoram
Central - Unallocated
Total (North-
Eastern Region)
Hydro
(Renewable)
RES
(MNRE)
Assam
Arunachal Pradesh
Meghalaya
Tripura
File NoCEA-CH-14-1142018-Coordination Division
(As on 31102018)
Coal Gas Diesel Total
State 000 000 4005 4005 000 000 525 4530
Private 000 000 000 000 000 000 146 146
Central 000 000 000 000 000 000 510 510
Sub-Total 000 000 4005 4005 000 000 1181 5186
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 075 075
Central 000 000 000 000 000 000 000 000
Sub-Total 000 000 000 000 000 000 075 075
State 000 000 4005 4005 000 000 525 4530
Private 000 000 000 000 000 000 221 221
Central 000 000 000 000 000 000 510 510
Grand Total 000 000 4005 4005 000 000 1256 5261
19
Andaman amp
Nicobar
lakshadweep
Total (Islands)
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
State Ownership Sector
Modewise breakup
Grand TotalThermalNuclear
Hydro
(Renewable)
RES
(MNRE)
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
ISLANDS
File NoCEA-CH-14-1142018-Coordination Division
SrNo Contents Page
1 Executive summary of Target and Achievement of Transmission Lines during 2018-19
20(1)
2 List of Transmission Lines CommissionedReady for commissioning during Oct-2018 20(2)
Section C - Transmission Lines
File NoCEA-CH-14-1142018-Coordination Division
Executive summary of Target and Achievement of Transmission Lines during 2018-19 As on Oct-18
(All figures in circuit kms)
Centr
al S
ecto
r
Sta
te S
ecto
r
JV
Private
Secto
r
To
tal
Centr
al S
ecto
r
Sta
te S
ecto
r
JV
Private
Secto
r
To
tal
Centr
al S
ecto
r
Sta
te S
ecto
r
JV
Private
Secto
r
To
tal
Centr
al S
ecto
r
Sta
te S
ecto
r
JV
Private
Secto
r
To
tal
Centr
al S
ecto
r
Sta
te S
ecto
r
JV
Private
Secto
r
To
tal
Cen
tral S
ecto
r
Sta
te S
ecto
r
JV
Pri
vate
Secto
r
Gra
nd
To
tal
0 0 0 0 0 0 0 0 4692 766 827 6285 3045 5906 980 9931 553 5878 0 6431 8290 12550 1807 22647
Oct18 Programme 0 0 0 0 0 0 0 0 300 0 0 300 662 90 562 1314 0 723 0 723 962 813 562 2337
Achievement 0 0 0 0 0 0 0 0 729 0 0 729 471 266 0 737 0 401 0 401 1200 667 0 1867
Upto Oct-18 Programme 0 0 0 0 0 0 0 0 3004 416 0 3420 1350 3109 562 5021 481 4346 0 4827 4835 7871 562 13268
Achievement 0 0 0 0 0 0 0 0 2286 0 178 2464 1436 1783 1595 4814 60 4461 0 4521 3782 6244 1773 11799
20(1)
220 kV Grand Total 800 kV 500 kV
Programme 2018-19
Programme
Achievement
HVDC765 kV 400 kV
File NoCEA-CH-14-1142018-Coordination Division
SlNo Line
Length
(cKM)
1 2 3 4 5 6
1 765 Jharsuguda - Dharamjaygarh line DC PGCIL 296
2 765LILO of Kurnool - Thirvualam line at
CuddapahDC PGCIL 190
3 765 Salem PS - Madhugiri PS line SC PGCIL 243
4 400 Cuddapah - Hindupur line (Q) DC PGCIL 338
5 400LILO of Both Ckt of Bamnauli - Samaypur at
TughlakabadMC PGCIL 114
6 400LILO-Out of Cuddapah - Hindupur line (Q)
(Both Ckts) at NP Kunta ssDC PGCIL 19
1200
7 400LILO of Sterlite - Meramundali at Lapanga
4oo kV ssDC OPTCL 14
8 400 Sterlite - Lapanga line DC OPTCL 37
9 400 TMDC Podili - Sattapenalli line DC APTRANSCO 215
10 230Neyveli 230110 kV ss - Eachangadu
230kV FeederSC TANTRANSCO 1
11 230 NNTPS - Neyveli 230110kV ss DC TANTRANSCO 2
12 220 Ajmer (400 kV) - Bherunda (TK) DC RVPNL 100
13 220 Aligarh - Atrauli line DC UPPTCL 77
14 220 Khandwa - Chhanera line DC MPPTCL 78
15 220LILO of one Ckt of Hadala - Sartanpar line
at Wankaner on MC towersDC GETCO 6
16 220 LILO of one Ckt of Vita - Miraj at Alkud ss DC MSETCL 27
17 220 Mendhigiri - Alkud ss DC MSETCL 110
667
1867
20(2)
Grand Total
2Transmission Lines (220 kV and above) CommissionedReady for commissioning During Oct-2018
As on 31-10-18
Voltage
Level (kV)Name of Transmission Lines
Circuit
Type
Executing
Agency
CENTRAL SECTOR
Total of CENTRAL SECTOR
STATE SECTOR Sector
Total of STATE SECTOR
File NoCEA-CH-14-1142018-Coordination Division
SN Contents Page
1 Executive summary of Target and Achievement of Substations during 2018-19 21(1)
2Sub Stations (220 kV and above) commissionedready for commisssioning during Oct-
201821(2)
Section D - Sub Stations
File NoCEA-CH-14-1142018-Coordination Division
1 Executive summary of Target and Achievement of Substations during 2018-19 As on Oct-18
(All figures in circuit MVA)
Centr
al S
ecto
r
Sta
te S
ecto
r
JV
Private
Secto
r
To
tal
Centr
al S
ecto
r
Sta
te S
ecto
r
JV
Private
Secto
r
To
tal
Centr
al S
ecto
r
Sta
te S
ecto
r
JV
Private
Secto
r
To
tal
Centr
al S
ecto
r
Sta
te S
ecto
r
JV
Private
Secto
r
To
tal
Centr
al S
ecto
r
Sta
te S
ecto
r
JV
Private
Secto
r
To
tal
Cen
tral S
ecto
r
Sta
te S
ecto
r
JV
Pri
vate
Secto
r
Gra
nd
To
tal
3000 0 0 3000 0 0 0 0 22200 0 0 22200 8185 13085 630 21900 740 14760 0 15500 34125 27845 630 62600
Oct18 Programme 0 0 0 0 0 0 0 0 0 0 0 0 1000 1260 630 2890 0 1400 0 1400 1000 2660 630 4290
Achievement 0 0 0 0 0 0 0 0 3000 0 0 3000 1500 3120 0 4620 0 2220 0 2220 4500 5340 0 9840
Upto Oct-18 Programme 0 0 0 0 0 0 0 0 10000 0 0 10000 6130 7435 630 14195 0 9670 0 9670 16130 17105 630 33865
Achievement 0 0 0 0 0 0 0 0 14000 0 0 14000 9000 7550 630 17180 0 10610 0 10610 23000 18160 630 41790
21(1)
220 kV Grand Total 800 kV 500 kV
Programme 2018-19
Programme
Achievement
HVDC765 kV 400 kV
File NoCEA-CH-14-1142018-Coordination Division
As on 31-10-18
Sl Voltage Ratio Capacity
No (kVkV) (MWMVA)
1 2 3 4 5
1 Cuddapah Ss 765400 PGCIL 3000
2 Tughlakabad SS (GIS) 400220 PGCIL 1500
Total of CENTRAL SECTOR 4500
3 Panki Kanpur (Aug) TF-I 400200 UPPTCL 75
4 Hindupur ss (1st ICT) 400220 APTRANSCO 315
5 Thappagundu ss 400110 TANTRANSCO 600
6 Mendhasal (2nd power TF) 400220 OPTCL 20
7 Jodhpur ss (New) 400220 RVPNL 315
8 Shankarpally 400220 TSTRANSCO 500
9 Podili ss (1st ICT) 400220 APTRANSCO 315
10 Doni (Gadag)SS 400220 KPTCL 1000
11 Porur (Addl TF) 230110 TANTRANSCO 100
12 Anuppankulam (Addl TF) 230110 TANTRANSCO 60
13 Neyveli SS 230110 TANTRANSCO 480
14 Savarkundla (Aug) 22066 GETCO 60
15 Bhuna (Aug) 220132 HVPNL 100
16 Madanpur (Aug) 22066 HVPNL 100
17 Gurgaon Sec-52A (Aug) 22066 HVPNL 160
18 IA Hisar (Aug) 220132 HVPNL 50
19 Narwana (Aug) 220132 HVPNL 60
20 Therubali (3rd Auto TF) 220132 OPTCL 160
21 Halasar ss 220132 RVPNL 160
22 Bansi Siddaharthnagar (Aug) TF-I 220132 UPPTCL 60
23 Hata Kushinagar (New) TF-I 220132 UPPTCL 100
24 Gomti nagar Lucknow (Aug) TF-IV 22033 UPPTCL 60
25 Kanpur Road Lucknow (New) TF-III 22033 UPPTCL 60
26 Asoj (Aug) 22066 GETCO 150
27 Kangasiyali (Aug) 22066 GETCO 60
28 Karmsad (Aug) 22066 GETCO 160
29 Lalpar (Aug) 22066 GETCO 60
TOTAL STATE SECTOR 5340
GRAND TOTAL 9840
21(2)
PRIVATE SECTOR
CENTRAL SECTOR
STATE SECTOR
2Sub-Stations (220 kV and above) CommissionedReady for commissioning During Oct-2018
Name of Sub StationsExecuting
Agency
File NoCEA-CH-14-1142018-Coordination Division
SN Contents Page
1 Electricity Generation (MU) Targets and Achievements for 2018-19 22
Section E - Electricity Generation
File NoCEA-CH-14-1142018-Coordination Division
Programme Achievement Ach Programme Achievement Ach
Central Sector 35160700 3028100 3162321 10443 20144400 21150469 10499
State Sector 35132000 3010000 3017260 10024 19922100 19549030 9813
PvtIPP Sector 36999700 3240600 3375603 10417 21598300 20794155 9628
PvtUTL Sector 1857600 164500 180597 10979 1130900 1203107 10638
Total 109150000 9443200 9735781 10310 62795700 62696761 9984
Central Sector 5617600 420900 451004 10715 4193000 4045436 9648
State Sector 6110600 559500 708469 12663 4049400 4433000 10947
PvtIPP Sector 1141800 80500 90122 11195 976400 1021963 10467
PvtUTL Sector 130000 11300 12564 11119 76700 99943 13030
Total 13000000 1072200 1262159 11772 9295500 9600342 10328
Central Sector 3850000 353300 303310 8585 2068900 2203540 10651
Total 3850000 353300 303310 8585 2068900 2203540 10651
Bhutan Import 500000 63300 35395 5592 347000 416660 12007
Central Sector 44628300 3802300 3916635 10301 26406300 27399445 10376
State Sector 41242600 3569500 3725729 10438 23971500 23982030 10004
Pvt Sector 40129100 3496900 3658886 10463 23782300 23119168 9721
Total 126500000 10932000 11336645 10370 74507100 74917303 10055
Provisional based on actual-cum-Assesment
Figs in MU
Cummulative
Achievement
Cummulative
Achievement
Sep-18 Sep-17 Upto Sep-2018 Upto Sep-2017
1073794 748889 7332680 5660929
22
Renewable Energy Generation
Achievement
Oct-2018
1 Electricity Generation (MU) Targets and Achievememts for 2018-19
All India Energy Generation During April 2018- Oct 2018 (MU)
Target (2018-19)April 2018- Oct 2018
Sector
Hydro
Thermal
Nuclear
627957
92955
20689
745071
626968
96003
22035
749173
0
100000
200000
300000
400000
500000
600000
700000
800000
Thermal Hydro Nuclear Total
Programme
Achievement
File NoCEA-CH-14-1142018-Coordination Division
SN Contents Page
1 Energy Power Supply Position (Provisional) for Oct-2018 and during April 2018- Oct 2018 23
2 Peak Power Supply Position (Provisional) for Oct-2018 and during April 2018- Oct 2018 24
3 Energy Power Supply Position (Revised) for Sep-2018 and during April 2018- Sept 2018 25
4 Peak Power Supply Position (Revised) for Sep-2018 and during April 2018- Sept 2018 26
5 Notified Power cuts Restrictions on Industries during Oct-2018 27
6 Power Supply to Agricultural Sector during Oct-2018 28
Section F - Power supply position
File NoCEA-CH-14-1142018-Coordination Division
आकड़ मममलयन यननट नट Figures in MU net
ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied
कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )
चडीगढ़ Chandigarh 108 108 0 00 1055 1055 0 00
दिलली Delhi 2490 2489 1 00 22524 22510 14 01
हरियजणज Haryana 4554 4554 0 00 35205 35205 0 00
दहमजचल परिश Himachal Pradesh 788 787 2 02 5728 5560 168 29
रमम कशमीि Jammu amp Kashmir 1497 1219 278 186 10982 8865 2117 193
परजब Punjab 4418 4418 0 00 38832 38819 13 00
िजरसथजन Rajasthan 6748 6748 0 00 45341 45181 160 04
उतति परिश Uttar Pradesh 10136 9973 164 16 75485 74808 676 09
उततिजखड Uttarakhand 1083 1081 3 03 8395 8310 85 10
उततरी कषतर Northern Region 31822 31375 447 14 243547 240314 3233 13
छततीसगढ़ Chhattisgarh 2454 2453 1 00 16119 16091 28 02
गरिजत Gujarat 11636 11636 0 00 70782 70768 14 00
मधय परिश Madhya Pradesh 5860 5859 1 00 38412 38410 2 00
महजिजषटर Maharashtra 15223 15095 128 08 95489 95355 134 01
िमन औि दिउ Daman amp Diu 216 216 0 00 1523 1523 0 00
िजिि व नगि हवली Dadra amp Nagar Haveli 553 553 0 00 3757 3757 0 00
गोवज Goa 366 366 0 00 2497 2495 2 01
पशचिमी कषतर Western Region 36308 36178 130 04 228579 228398 180 01
आनधर परिश Andhra Pradesh 5860 5854 6 01 37377 37334 43 01
तलगजनज Telangana 6748 6742 6 01 38251 38205 46 01
कनजाटक Karnataka 5842 5835 7 01 39111 39059 52 01
किल Kerala 2116 2096 20 09 14256 14160 96 07
तममल नजड Tamil Nadu 8611 8601 10 01 65742 65666 76 01
पडचिी Puducherry 216 215 1 05 1654 1646 8 05
लकष-दवीप Lakshadweep 4 4 0 0 27 27 0 0
दकषकषणी कषतर Southern Region 29392 29342 50 02 196390 196069 321 02
बबहजि Bihar 2742 2738 4 01 19143 18951 192 10
िजमोिि घजटी ननगम DVC 1712 1698 13 08 13096 12828 268 20
झजिखणड Jharkhand 701 697 4 06 5022 4949 73 15
ओडडशज Odisha 3147 3134 13 04 20224 20192 32 02
पशशचम बगजल West Bengal 4204 4200 4 01 33008 32881 127 04
मसशककम Sikkim 40 40 0 00 279 279 0 01
अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 67 202 188 13 67
परवी कषतर Eastern Region 12547 12507 40 03 90772 90080 692 08
अरणजचल परिश Arunachal Pradesh 67 66 1 09 502 496 7 13
असम Assam 833 809 24 29 6153 5903 250 41
मणणपि Manipur 72 71 1 10 485 478 7 14
मघजलय Meghalaya 147 147 0 00 1043 1042 0 00
ममज़ोिम Mizoram 63 62 1 08 365 359 5 14
नजगजलड Nagaland 76 67 8 110 540 481 59 109
बिपिज Tripura 130 129 1 09 1025 1007 19 18
उततर-परवी कषतर North-Eastern Region 1387 1351 35 25 10113 9766 346 34
समपणण भारत All India 111455 110753 702 06 769399 764627 4773 06
23
ऊराण वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Energy Power Supply Position Report (Provisional)
राजयStateअकरबर2018 October2018 अपरल2018 -अकरबर2018 April2018 to October2018
ऊरजा पनत ा म कमी ऊरजा पनत ा म कमीEnergy not Supplied
Excludes energy exported to Bangladesh
Energy not Supplied
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
File NoCEA-CH-14-1142018-Coordination Division
अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met
कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )
चडीगढ़ Chandigarh 217 217 0 00 369 369 0 00
दिलली Delhi 4713 4713 0 00 7016 7016 0 00
हरियजणज Haryana 7948 7948 0 00 10270 10270 0 00
दहमजचल परिश Himachal Pradesh 1520 1520 0 00 1520 1520 0 00
रमम कशमीि Jammu amp Kashmir 2836 2269 567 200 2951 2361 590 200
परजब Punjab 7979 7979 0 00 12638 12638 0 00
िजरसथजन Rajasthan 11450 11450 0 00 11698 11698 0 00
उतति परिश Uttar Pradesh 17434 16745 688 39 20498 20062 436 21
उततिजखड Uttarakhand 1943 1943 0 00 2143 2143 0 00
उततरी कषतर Northern Region 50659 49635 1024 20 63166 61726 1440 23
छततीसगढ़ Chhattisgarh 4414 4268 146 33 4414 4268 146 33
गरिजत Gujarat 18148 18130 19 01 18148 18130 19 01
मधय परिश Madhya Pradesh 11356 11317 39 03 11356 11317 39 03
महजिजषटर Maharashtra 23864 23159 705 30 23864 23254 610 26
िमन औि दिउ Daman amp Diu 342 341 1 02 357 356 1 02
िजिि व नगि हवली Dadra amp Nagar Haveli 784 780 4 05 816 815 1 01
गोवज Goa 536 536 0 00 596 596 0 00
पशचिमी कषतर Western Region 56548 55695 853 15 56548 55695 853 15
आनधर परिश Andhra Pradesh 9435 9435 0 00 9435 9435 0 00
तलगजनज Telangana 10603 10603 0 00 10815 10815 0 00
कनजाटक Karnataka 10741 10741 0 00 10741 10741 0 00
किल Kerala 3727 3644 83 22 4050 3997 53 13
तममल नजड Tamil Nadu 14747 14333 414 28 15029 14981 47 03
पडचिी Puducherry 363 362 1 03 420 400 19 46
लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0
दकषकषणी कषतर Southern Region 45279 45226 53 01 45946 45684 262 06
बबहजि Bihar 4945 4945 0 00 5050 5045 5 01
िजमोिि घजटी ननगम DVC 2729 2729 0 00 2874 2874 0 00
झजिखणड Jharkhand 1260 1260 0 00 1339 1284 55 41
ओडडशज Odisha 5624 5224 400 71 5624 5357 268 48
पशशचम बगजल West Bengal 8775 8775 0 00 9130 9123 7 01
मसशककम Sikkim 86 86 0 00 90 90 0 00
अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7
परवी कषतर Eastern Region 22959 22567 392 17 22959 22567 392 17
अरणजचल परिश Arunachal Pradesh 138 125 13 94 138 133 5 37
असम Assam 1785 1704 81 45 1865 1809 56 30
मणणपि Manipur 187 185 2 11 193 186 7 36
मघजलय Meghalaya 336 336 0 00 371 368 2 07
ममज़ोिम Mizoram 99 97 2 20 103 98 4 41
नजगजलड Nagaland 134 131 3 22 156 138 18 117
बिपिज Tripura 269 269 0 00 298 293 5 17
उततर-परवी कषतर North-Eastern Region 2790 2700 90 32 2967 2850 117 39
समपणण भारत All India 172945 170604 2341 14 177022 175528 1494 08
24
अधिकतम वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Peak Power Supply Position Report (Provisional)
आकड़ मगज वजट नट Figures in MW netअपरल2018 -अकरबर2018 April2018 to October2018
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
मजग की पनता म कमी Demand not Met
Excludes the supply to Bangladesh
राजयStateअकरबर2018 October2018
मजग की पनता म कमी Demand not Met
File NoCEA-CH-14-1142018-Coordination Division
आकड़ मममलयन यननट नट Figures in MU net
ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied
कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )
चडीगढ़ Chandigarh 141 141 0 00 947 947 0 00
दिलली Delhi 2925 2924 1 00 20034 20021 13 01
हरियजणज Haryana 4794 4794 0 00 30651 30651 0 00
दहमजचल परिश Himachal Pradesh 876 853 24 27 4940 4773 167 34
रमम कशमीि Jammu amp Kashmir 1520 1246 274 180 9485 7646 1839 194
परजब Punjab 5575 5575 0 00 34414 34401 13 00
िजरसथजन Rajasthan 6202 6201 0 00 38594 38434 160 04
उतति परिश Uttar Pradesh 10211 10124 86 08 65349 64836 513 08
उततिजखड Uttarakhand 1162 1149 13 11 7311 7229 82 11
उततरी कषतर Northern Region 33405 33008 398 12 211725 208939 2786 13
छततीसगढ़ Chhattisgarh 2403 2388 15 06 13665 13638 27 02
गरिजत Gujarat 10122 10122 0 00 59146 59132 14 00
मधय परिश Madhya Pradesh 5492 5491 1 00 32552 32551 1 00
महजिजषटर Maharashtra 13615 13612 3 00 80266 80260 6 00
िमन औि दिउ Daman amp Diu 221 221 0 00 1306 1306 0 00
िजिि व नगि हवली Dadra amp Nagar Haveli 551 551 0 00 3204 3204 0 00
गोवज Goa 339 339 0 00 2131 2128 2 01
पशचिमी कषतर Western Region 32742 32723 19 01 192270 192220 50 00
आनधर परिश Andhra Pradesh 5294 5287 7 01 31518 31480 37 01
तलगजनज Telangana 6279 6272 8 01 31503 31463 40 01
कनजाटक Karnataka 5701 5693 8 01 33269 33225 45 01
किल Kerala 2050 2026 24 12 12140 12063 76 06
तममल नजड Tamil Nadu 8971 8959 12 01 57131 57065 66 01
पडचिी Puducherry 226 224 2 08 1438 1431 7 05
लकष-दवीप Lakshadweep 4 4 0 0 23 23 0 0
दकषकषणी कषतर Southern Region 28520 28460 60 02 166998 166727 271 02
बबहजि Bihar 2839 2793 46 16 16400 16213 188 11
िजमोिि घजटी ननगम DVC 1901 1750 151 79 11384 11130 254 22
झजिखणड Jharkhand 740 723 17 22 4321 4252 69 16
ओडडशज Odisha 2921 2918 3 01 17077 17058 19 01
पशशचम बगजल West Bengal 4902 4879 23 05 28804 28681 123 04
मसशककम Sikkim 39 39 0 01 239 239 0 01
अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 67 173 162 12 67
परवी कषतर Eastern Region 13341 13102 240 18 78225 77573 652 08
अरणजचल परिश Arunachal Pradesh 74 73 1 10 435 429 6 14
असम Assam 950 914 36 38 5320 5094 226 43
मणणपि Manipur 70 69 1 11 414 408 6 15
मघजलय Meghalaya 150 150 0 01 896 896 0 01
ममज़ोिम Mizoram 58 57 1 12 302 297 5 16
नजगजलड Nagaland 80 72 8 104 464 414 50 108
बिपिज Tripura 192 191 1 07 895 878 17 19
उततर-परवी कषतर North-Eastern Region 1575 1527 48 31 8726 8415 311 36
समपणण भारत All India 109584 108819 765 07 657944 653873 4071 06
Energy not Supplied Energy not Supplied
ससतबर2018 September2018 अपरल2018 -ससतबर2018 April2018 to September2018
ऊरजा पनत ा म कमी ऊरजा पनत ा म कमी
Excludes energy exported to Bangladesh
राजयState
ऊराण वरवदयत आपरतण शथिरत ररपोरण (सशोधित) Energy Power Supply Position Report (Revised)
25
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
File NoCEA-CH-14-1142018-Coordination Division
अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met
कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )
चडीगढ़ Chandigarh 293 293 0 00 369 369 0 00
दिलली Delhi 5358 5358 0 00 7016 7016 0 00
हरियजणज Haryana 9008 9008 0 00 10270 10270 0 00
दहमजचल परिश Himachal Pradesh 1466 1466 0 00 1479 1479 0 00
रमम कशमीि Jammu amp Kashmir 2951 2361 590 200 2951 2361 590 200
परजब Punjab 11405 11405 0 00 12638 12638 0 00
िजरसथजन Rajasthan 10612 10612 0 00 11698 11698 0 00
उतति परिश Uttar Pradesh 18346 18121 225 12 20498 20062 436 21
उततिजखड Uttarakhand 1996 1996 0 00 2143 2143 0 00
उततरी कषतर Northern Region 56407 55649 758 13 63166 61726 1440 23
छततीसगढ़ Chhattisgarh 4404 4075 328 75 4404 4136 268 61
गरिजत Gujarat 16963 16963 0 00 17053 16963 90 05
मधय परिश Madhya Pradesh 8811 8771 41 05 8811 8775 36 04
महजिजषटर Maharashtra 22455 22349 106 05 23395 23254 141 06
िमन औि दिउ Daman amp Diu 357 356 1 02 357 356 1 02
िजिि व नगि हवली Dadra amp Nagar Haveli 816 815 1 01 816 815 1 01
गोवज Goa 596 596 0 00 596 596 0 00
पशचिमी कषतर Western Region 52933 52895 38 01 53841 52895 945 18
आनधर परिश Andhra Pradesh 9435 9416 19 02 9435 9416 19 02
तलगजनज Telangana 10815 10815 0 00 10815 10815 0 00
कनजाटक Karnataka 10103 10090 13 01 10690 10688 2 00
किल Kerala 3888 3638 251 64 4050 3997 53 13
तममल नजड Tamil Nadu 14556 14553 3 00 15029 14981 47 03
पडचिी Puducherry 390 372 17 45 420 400 19 46
लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0
दकषकषणी कषतर Southern Region 45542 45428 114 02 45946 45684 262 06
बबहजि Bihar 5050 5045 5 01 5050 5045 5 01
िजमोिि घजटी ननगम DVC 2641 2641 0 00 2874 2874 0 00
झजिखणड Jharkhand 1233 1233 0 00 1339 1284 55 41
ओडडशज Odisha 4906 4906 0 00 5357 5357 0 00
पशशचम बगजल West Bengal 8644 8639 5 01 9130 9123 7 01
मसशककम Sikkim 78 78 0 00 90 90 0 00
अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7
परवी कषतर Eastern Region 22110 22100 10 00 22470 22290 180 08
अरणजचल परिश Arunachal Pradesh 132 130 2 15 138 133 5 37
असम Assam 1865 1809 56 30 1865 1809 56 30
मणणपि Manipur 184 182 2 13 193 186 7 36
मघजलय Meghalaya 317 317 0 00 371 368 2 07
ममज़ोिम Mizoram 95 93 2 23 103 98 4 41
नजगजलड Nagaland 142 138 5 32 156 138 18 117
बिपिज Tripura 296 293 3 10 298 293 5 17
उततर-परवी कषतर North-Eastern Region 2921 2850 71 24 2967 2850 117 39
समपणण भारत All India 177022 175528 1494 08 177022 175528 1494 08
26
मजग की पनता म कमी मजग की पनता म कमी Demand not MetDemand not Met
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
Excludes the supply to Bangladesh
अधिकतम वरवदयत आपरतण शथिरत ररपोरण (सशोधित) Peak Power Supply Position Report (Revised)
आकड़ मगज वजट नट Figures in MW net
राजयStateससतबर2018 September2018 अपरल2018 -ससतबर2018 April2018 to September2018
File NoCEA-CH-14-1142018-Coordination Division
अकरबर2018 October2018अपरल2018 -अकरबर2018 April2018 to October2018
उततरी कषतर Northern Region
चडीगढ़ Chandigarh Data not received Data not received
दिलली Delhi
हरियजणज Haryana
दहमजचल परिश Himachal Pradesh
रमम कशमीि Jammu amp Kashmir Data not received Data not received
परजब Punjab
िजरसथजन Rajasthanउतति परिश Uttar Pradesh
उततिजखड Uttarakhand
पशचिमी कषतर Western Region
छततीसगढ़ Chhattisgarh
गरिजत Gujarat
मधय परिश Madhya Pradesh
महजिजषटर Maharashtra
गोवज Goa
दकषकषणी कषतर Southern Region
आनधर परिश Andhra Pradesh
तलगजनज Telangana
कनजाटक Karnataka
किल Kerala
तममल नजड Tamil Nadu
पडचिी Puducherryपरवी कषतर Eastern Region
बबहजि Bihar
झजिखणड Jharkhand
ओडडशज Odisha
पशशचम बगजल West Bengal
N
o No
tified
Cuts
N
o No
tified
Cuts
27
अकरबर 2018 म इडथरीर पर वरवदयत करौती का वरवरवरण Notified Power CutsRestrictions on Industries during October2018
राजय कषतर State Regionऊराणमाग करौती EnergyDemand Cut
No Notified Cuts No Notified Cuts
File NoCEA-CH-14-1142018-Coordination Division
अकरबर2018 October2018अपरल2018 -अकरबर2018 April2018 to October2018
उततरी कषतर Northern Region
चडीगढ़ Chandigarh Data not received Data not received
दिलली Delhi Data not received Data not received
हरियजणज Haryana 940 hrsday 0709 - 0950 hrsday
दहमजचल परिश Himachal Pradesh No cut imposed on agriculture consumers and uninterrupted
power is being supplied to agriculture sector
HPSEBL has only 2 agriculture consumers and uninterrupted
power is being supplied to agriculture sector
रमम कशमीि Jammu amp Kashmir Data not received Data not received
परजब Punjab 0507 hrsday 0349 - 0844 hrsday
िजरसथजन Rajasthan 0630 hrsday 0630 hrsday
उतति परिश Uttar Pradesh 1825 hrsday 1814 - 1858 hrsday
उततिजखड Uttarakhand 2350 hrsday 2128 - 2357 hrsday
पशचिमी कषतर Western Region
छततीसगढ़ Chhattisgarh 18hoursday 18 hrsday
गरिजत Gujarat 805 hrsday 805 hrsday
मधय परिश Madhya Pradesh Three-Phase Supply(Irrigation)-947 hrs day
Three-Phase (Mixed) Supply - 2311 hrs day
Three-Phase Supply(Irrigation)- 0933 - 0947 hrs day Three-
Phase (Mixed) Supply - 2300 - 2320 hrs day
महजिजषटर Maharashtra Three-Phase Supply(Irrigation)- 9 hrs day
Three-Phase (Mixed) Supply - 24 hrs day
Three-Phase Supply(Irrigation)- 9 hrs day
Three-Phase (Mixed) Supply - 24 hrs day
गोवज Goa No restriction No restriction
दकषकषणी कषतर Southern Region
आनधर परिश Andhra Pradesh 07 hrsday 07 hrsday
तलगजनज Telangana 24 hoursday 24 hoursday
कनजाटक Karnataka 6 hrsday 6 hrsday
किल Kerala No Restrictions No Restrictions
तममल नजड Tamil Nadu 9 hrsday (6 hrs during day time and 3 hrs during night time) 9 hrsday (6 hrs during day time and 3 hrs during night time)
पडचिी Puducherry No Restrictions No Restrictions
परवी कषतर Eastern Region
बबहजि Bihar About 18 hrsday About 18 hrsday
झजिखणड Jharkhand About 20 hrsday About 20 hrsday
ओडडशज Odisha 24 hrsday 24 hrsday
पशशचम बगजल West Bengal About 23 hrsday About 23 hrsday
28
अकटबर 2018 कषि कषतर को षिदयत आपरति का षििरण Power Supply to Agricultural Sector during October2018
राजय कषतर State Regionऔसत वरवदयत आपरतण घनरो म Average Hours of Supply
On segregated feeders
File NoCEA-CH-14-1142018-Coordination Division
SNo Contents Page
1 Growth of Installed Capacity since 6th Plan 29
2 Progress of Transmission Sector since 6th Plan 30
3 All India Yearly Coal consumption for Power Generation (Utilities)
4 All India Annual Per Capita Consumption of Electricity since -2006
5 Average cost of power supply amp Average realisation (Paisakwh)
6 Growth of Rural Electrification amp Pump Sets Energisation
7 Status of Hydro Schemes Cleared by the CEA in Oct-2018
Section G - Growth of Power Sector
31
32
File NoCEA-CH-14-1142018-Coordination Division
(In MW)
Coal Gas Diesel Total
End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472
End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634
End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537
End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596
End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921
End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703
End of 12th Plan 19216288 2532938 83763 21832988 6780 4447842 50018 31960630
Up to Oct-2018 19599250 2493722 837629 22176734 6780 4548742 7201281 34604757
Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-17) = 51529 MW
Electricity Generation (MU) Targets and Achievements for 2016-17
Coal Gas Diesel Nuclear Hydro Res Total
1959925 2493722 837629 678000 454874 72012805 22925174
29
1 Growth of Installed Capacity Since 6th Plan
Plan YearThermal
Nuclear Hydro RES (MNRE) Total
Total Installed Capacity 34604757 MW
Coal Gas Diesel Nuclear Hydro Res
File NoCEA-CH-14-1142018-Coordination Division
Progress of Transmission Sector in the Country up to Oct 2018
1 TRANSMISSION LINES (All fig in CKM)
At the end of
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
6th plan 0 0 0 0 0 0 0 0 0 0 0 0 1831 4198 0 6029 1641 44364 0 46005 3472 48562 0 52034
7th plan 0 0 0 0 0 0 0 0 0 0 0 0 13068 6756 0 19824 4560 55071 0 59631 17628 61827 0 79455
8th plan 0 0 0 0 1634 0 0 1634 0 0 0 0 23001 13141 0 36142 6564 73036 0 79600 31199 86177 0 117376
9th plan 0 0 0 0 3234 1504 0 4738 751 409 0 1160 29345 20033 0 49378 8687 88306 0 96993 42017 110252 0 152269
10th plan 0 0 0 0 4368 1504 0 5872 1775 409 0 2184 48708 24730 0 73438 9444 105185 0 114629 64295 131828 0 196123
11th Plan 0 0 0 0 5948 1504 1980 9432 4839 411 0 5250 71023 30191 5605 106819 10140 125010 830 135980 91950 157116 8415 257481
12th Plan 6124 0 0 6124 5948 1504 1980 9432 25465 1177 4598 31240 92482 48240 17065 157787 11014 151276 978 163268 141033 202197 24621 367851
13th Plan (Up
to Mar2018)6124 0 0 6124 5948 1504 1980 9432 28666 1512 4881 35059 98247 54286 19067 171600 11258 156497 1000 168755 150243 213799 26928 390970
13th Plan (Up
to Sep-18)6124 0 0 6124 5948 1504 1980 9432 30952 1512 5059 37523 99683 56069 20662 176414 11318 160958 1000 173276 154025 220043 28701 402769
27150
75050
47900
118050
90650
30
IR addition in 12th Plan (up to
March 2017)
Total IR (up to Oct-18)
IR at the end of 11th Plan
IR at the end of 12th Plan
Envisaged IR Capacity at the end
of 13th Plan
Grand Total
Note - The figure upto the end of 10th plan in for stringing progress including the lines not commissioned Now only commissioned lines are reckoned Accordingly the figure for 10th plan (end) may read as 187555 after adjusting with (-) 10852 Ckm
Inter-regional Power Transfer Capacity
plusmn 800 kV HVDC plusmn 500 kV HVDC 765 kV 400 kV 220 kV
File NoCEA-CH-14-1142018-Coordination Division
2004-05 27800
2005-06 28100
2006-07 30200
2007-08 33000
2008-09 35500
2009-10 36700
2010-11 38700
2011-12 41756
2012-13 45460
2013-14 48940
2014-15 53040
2015-16 54590
2016-17 57430
2017-18 60800
Year
2005-06
2006-07
2007-08
2008-09
2009-10
2010-11
2011-12
2012-13
2013-14
2014-15
2015-16
2016-17
2017-18
2004-05 254 209 7568
2005-06 260 221 7636
2006-07 276 227 7423
2007-08 293 239 7727
2008-09 340 263 8713
2009-10 355 268 8870
2010-11 398 303 11975
2011-12 455 330 13514
2012-13 501 376 14867
2013-14 518 175
2014-15 520
6719
7171
3 All India yearly Coal Consumption for Power Generation (Utilities)
YEARCoal Consumption
Million Tonnes
4 All India Annual per Capita consumption of Electricity Since 2006
Per Capita Consumption ( kWh)
6314
(GrossGen+ Net Import) Mid-year population
5 Average cost of power supply amp average realization ( paiseKWH )
Yearcost of supply
(paiseunit)
Realization(paiseunit)
Including AgricultureOnly
Agriculture
1149
7335
7786
91441
8188
88363
957
1010
1075
1122
File NoCEA-CH-14-1142018-Coordination Division
Source- PFC Reports on the performance of State Power Utilities 31
File NoCEA-CH-14-1142018-Coordination Division
Sl
NoExecuting Agency
Installed
Capacity (MW)Cost (Rs crore)
Date of
Clearance
32
No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification
since 2004-05
65291374575 296361511th Plan
Cumu upto End of 11th Plan
596556 21212860
557439Cummulative up to end of 12th Plan
46708
18423975
499150
2003-042004-05
5743
9769
Cumu upto End of 10th Plan
010407 to 310308
010410 to 310311557976840909
010411 to 310312
412667
86293726
3207
482864
12632
1576036
4451722594
15455554
2314176
397343611750
2093311060316074
65109527813884
6 Growth Of Rural Electrification amp Pumpsets Energisation
Plan Year
9th Plan2002-03
134092626
4111
Pump Sets Energised Villages Electricfied (Nos)
2001-02
284064367244
1218
27801997-981998-991999-002000-01
297594
010408 to 310309010409 to 310310
10th Plan
2005-062006-07
322968331020
Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as
Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received
from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made
available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified
villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is
independent of the earlier published reports
No Hydro Electric Project has been issued concurrenceAppraisal letter by CEA during October 2018
7 Status of Hydro Schemes Cleared by the CEA in Oct-2018
Name of Scheme
File NoCEA-CH-14-1142018-Coordination Division
SN Contents Page
1 Rate of sale of power for the year 2016-17 33-41
RATE OF SALE OF POWER FOR THE YEAR 2016-17
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) NORTHERN REGION
CENTRAL SECTOR
BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 18000 66900 19800
CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 54000 222400 21600
CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 30000 144400 19600
CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 23100 91700 42600
PARBATI - III HPS NHPC LTD HYDRO-HYDRO 52000 68200 54800
DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 28000 95600 30000
CHUTAK NHPC LTD HYDRO-HYDRO 4400 22000 79800
DULHASTI HPS NHPC LTD HYDRO-HYDRO 39000 228000 56400
SALAL HPS NHPC LTD HYDRO-HYDRO 69000 342300 11000
TANAKPUR HPS NHPC LTD HYDRO-HYDRO 9420 43000 29600
URI HPS -I NHPC LTD HYDRO-HYDRO 48000 280300 16000
URI HPS - II NHPC LTD HYDRO-HYDRO 24000 147300 48600
NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 4500 24600 88200
SEWA - II NHPC LTD HYDRO-HYDRO 12000 47100 43400
ANTA CCPP NTPC LTD THERMAL-GASN 41930 67539 32400
AURAIYA CCPP NTPC LTD THERMAL-GASN 66336 53501 39100
BADARPUR TPS NTPC LTD THERMAL-COAL 70500 159153 44800
DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 84000 296170 42300
DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 98000 526686 46300
DADRI CCPP NTPC LTD THERMAL-GASHSD 82978 227469 33000
FARIDABAD CCPP NTPC LTD THERMAL-GASN 43159 115577 30800
RIHAND STPS I NTPC LTD THERMAL-COAL 100000 596766 24500
RIHAND STPS II NTPC LTD THERMAL-COAL 100000 737069 24600
RIHAND STPS III NTPC LTD THERMAL-COAL 100000 706546 30600
SINGRAULI STPS NTPC LTD THERMAL-COAL 200000 1394068 20400
TANDA TPS NTPC LTD THERMAL-COAL 44000 295438 40800
UNCHAHAR TPS I NTPC LTD THERMAL-COAL 42000 256454 39800
UNCHAHAR TPS II NTPC LTD THERMAL-COAL 42000 273577 38900
UNCHAHAR TPS III NTPC LTD THERMAL-COAL 21000 142780 43000
KOLDAM NTPC LTD HYDRO-HYDRO 80000 363260 43600
NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 303575 25841
RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 108000 668677 35374
NJHPS SJVNL HYDRO-HYDRO 150000 699496 23820
RAMPUR HPS SJVNL HYDRO-HYDRO 41202 195982 32260
TEHRI HPP THDC HYDRO-HYDRO 100000 272543 51800
KOTESHWAR HEP THDC HYDRO-HYDRO 40000 106244 53400
IGSTPS JHAJJAR ARAVALI P CPL THERMAL-COAL 150000 510429 49490
NEYVELI BARSINGSAR NEYVELI LIG CORP LTD THERMAL-LIG 25000 127520 38040
STATE SECTOR
PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 21000 14222 48200
PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 21000 19205 48400
PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 25000 102257 42600
PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 25000 62107 41800
DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 60000 312213 41000
RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 120000 35767442200
WYC HYDEL STATION HPGCL HYDRO-HYDRO 6240 20365 24900
GIRI POWER HOUSE HPSEB HYDRO-HYDRO 6000 13958 7600
ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 1695 5467 11900
BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 12000 18528 6700
GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 2250 7462 22500
BASSI POWER HOUSE HPSEB HYDRO-HYDRO 6600 29649 7500
BINWA POWER HOUSE HPSEB HYDRO-HYDRO 600 2749 19300
ANNEXURE-I
RATE OF SALE OF POWER FOR THE YEAR 2016-2017
Page 33
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) GAJ POWER HOUSE HPSEB HYDRO-HYDRO 1050 2914 26700
BANER POWER HOUSE HPSEB HYDRO-HYDRO 1200 2864 16200
HOLI POWER HOUSE HPSEB HYDRO-HYDRO 300 616 22500
THIROT POWER HOUSE HPSEB HYDRO-HYDRO 450 1126 22500
KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 1200 3064 22500
LARJI POWER HOUSE HPSEB HYDRO-HYDRO 12600 53677 23700
NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 250 750 31000
CHABA POWER HOUSE HPSEB HYDRO-HYDRO 175 465 23300
RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 150 101 13400
SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 200 000 22500
KILLAR HPSEB HYDRO-HYDRO 030 050 22500
BHABA AUGUMENP H HPSEB HYDRO-HYDRO 450 1276 22500
BS CHAMBA HPSEB HYDRO-HYDRO 045 099 19500
GUMMA HPSEB HYDRO-HYDRO 300 423 22500
GAS TURBINE POWER STATION IPGCL THERMAL-GAS 27000 67233 39300
PPS-I PPCL THERMAL-GAS 33000 175905 38300
PPS-III PPCL THERMAL-GAS 137120 196879 36100
LOWER JHELUM JampKPDD HYDRO-HYDRO 10500 60214 5100
UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 2260 10514 6300
UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 10500 44202 8500
GANDHARBAL JampKPDD HYDRO-HYDRO 1500 8925 4700
KARNAH MPH JampKPDD HYDRO-HYDRO 200 1122 31000
CHENANI I JampKPDD HYDRO-HYDRO 2330 10892 6600
CHENANI II JampKPDD HYDRO-HYDRO 200 1188 9300
CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 750 3634 14200
IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 375 2108 18500
IGO MERCHELLONG JampKPDD HYDRO-HYDRO 300 1572 29700
PAHALGAM MHP JampKPDD HYDRO-HYDRO 450 1713 32900
MARPACHOO JampKPDD HYDRO-HYDRO 075 375 29800
HAFTAL JampKPDD HYDRO-HYDRO 100 483 28700
SANJAK JampKPDD HYDRO-HYDRO 126 441 36000
SEWA-III JampKPDD HYDRO-HYDRO 900 3273 20200
BHADERWAH JampKPDD HYDRO-HYDRO 150 935 8900
BAZGO JampKPDD HYDRO-HYDRO 030 108 33300
SUMOOR JampKPDD HYDRO-HYDRO 010 045 35400
HUNDER JampKPDD HYDRO-HYDRO 040 176 26200
STAKNA JampKPDD HYDRO-HYDRO 400 1933 4100
KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 124000 662879 31360
SURATGARH TPS RRVUNL THERMAL-COAL 150000 402328 41730
CHHABRA TPS 1amp 2 RRVUNL THERMAL-COAL 50000 305946 36700
CHHABRA TPS 3 RRVUNL THERMAL-COAL 25000 151536 36700
CHHABRA TPS 4 RRVUNL THERMAL-COAL 25000 155896 36700
RAMGARH GT POWER PROJECT RRVUNL THERMAL-COAL 22050 43177 41800
RAMGARH GAS T P PROJECT 3 RRVUNL THERMAL-GAS 5000 93615 41800
DHOLPUR C C POWER PROJECT RRVUNL THERMAL-R-LNG 33000 9486 46110
MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 14000 20855 34192
MINI MICRO HYDEL (MMH) P S RRVUNL HYDRO-HYDRO 2385 851 37800
KALISINDH TPP 1 RRVUNL THERMAL-COAL 60000 341543 45000
KALISINDH TPP 2 RRVUNL THERMAL-COAL 60000 211588 45000
KHARA HEP UPJVNL HYDRO-HYDRO 7200 26654 7200
MATATILLA HEP UPJVNL HYDRO-HYDRO 3060 12219 6500
OBRA HEP UPJVNL HYDRO-HYDRO 9900 21517 6300
RIHAND UPJVNL HYDRO-HYDRO 30000 57369 5500
ANPARA A TPS UPRVUNL THERMAL-COAL 63000 317536 27000
ANPARA B TPS UPRVUNL THERMAL-COAL 100000 705605 22700
ANPARA D UPRVUNL THERMAL-COAL 100000 300158 39800
HARDUAGANJ TPS UPRVUNL THERMAL-COAL 16500 45817 49200
HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 50000 304389 46600
OBRA A TPS UPRVUNL THERMAL-COAL 28800 13158 34000
OBRA B TPS UPRVUNL THERMAL-COAL 100000 328124 21900
Page 34
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) PANKI TPS UPRVUNL THERMAL-COAL 21000 66488 50300
PARICHHA TPS UPRVUNL THERMAL-COAL 22000 38762 49400
PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 42000 231931 45600
PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 50000 276722 50400
CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 24000 70845 8290
CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 14400 75366 8390
DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 3375 9595 12080
DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 5100 18701 10520
KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4140 17359 12330
KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 12000 33001 9420
KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 3000 11953 8320
TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 9000 33983 12460
MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 30400 124510 16110
RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 19800 17897 10550
MPUR UTTARAKHAND JVNL HYDRO-HYDRO 930 5121 19200
PATHRI UTTARAKHAND JVNL HYDRO-HYDRO 2040 11636 14200
GALOGI UTTARAKHAND JVNL HYDRO-HYDRO 300 648 12500
PRIVATE SECTOR
MGTPP CLP INDIA PVT LTD THERMAL-COAL 132000 268902 41940
SHRINAGAR HEP ALAKNANDA HPCL HYDRO-HYDRO 33000 127414 48800
GAMA INFRAPROP CCPP GAMA INFRAPROP PVT THERMAL-GAS 22500 52686 47000
PPGCL (BARA) JP POWER VENTURES LTD THERMAL-COAL 198000 448200 38500
MALANA HEP MALANA PCL HYDRO-HYDRO 8600 26354 29792
MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 10000 30369 32580
ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 19200 56347 36079
KASHANG HEP H P PCL HYDRO-HYDRO 19500 5034 29200
BASPA-II HEP HBPCL HYDRO-HYDRO 30000 132769 13600
KARCHAM WANGTOO HEP HBPCL HYDRO-HYDRO 100000 434386 36600
RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 108000 582600 43700
RITHALA COMBI CY POWER PLANT TATA POWER DDL THERMAL-GAS 9480 000 11900
RAJPURA TPS NABHA POWER LTD THERMAL-GAS 140000 901484 39000
TALWANDI SABO POWER LTD TALWANDI SABO POWER LTD THERMAL-COAL 198000 636040 49548
ROJA THERMAL POWER STATION ROJA POWER SCL THERMAL-COAL 120000 727200 43400
KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 34400 63400
BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 36000 62600
MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 38200 60800
UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 37900 61500
KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 42300 58800
LALITPUR PGCL BAJAJ ENERGY PVT LTD THERMAL-COAL 198000 359400 47300
PRAYAGRAJ PGCL PRAYAGRAJ PGCL THERMAL-COAL 132000 448200 38595
KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 132000 783182 33438
WESTERN REGION
CENTRAL SECTOR
INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 100000 325333 23892
OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 52000 141663 34001
GANDHAR CCPP NTPC LTD THERMAL-GAS 65739 221924 28700
KAWAS CCPP NTPC LTD THERMAL-GASN 65620 167929 27000
KORBA I amp II NTPC LTD THERMAL-COAL 210000 1499171 20500
KORBA III NTPC LTD THERMAL-COAL 50000 358746 26600
SIPAT STPS I NTPC LTD THERMAL-COAL 198000 1479902 26800
SIPAT STPS II NTPC LTD THERMAL-COAL 100000 766549 26500
VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 126000 693142 25800
VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 100000 608781 23800
VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 100000 673475 27600
VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 100000 655924 32900
VINDHYACHAL STPS V NTPC LTD THERMAL-COAL 50000 328265 31700
MOUDA I NTPC LTD THERMAL-COAL 100000 343130 44500
MOUDA Ii NTPC LTD THERMAL-COAL 66000 40637 39900
RATNAGIRI GAS amp POWER PVT LTD RGPPL THERMAL-GAS 196708 442485 47000
KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 000 24729
TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 32000 201227 10740
Page 35
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 365122 19069
TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 787444 29324
STATE SECTOR
GSEG-HAZIRA15610 MW GUJARAT S ENEGEN LTD THERMAL-GAS 15610 1805 28200
GSEG-HAZIRA35143 MW GUJARAT S ENEGEN LTD THERMAL-GAS 35130 22276 51300
GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 21978 51800
AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 13929 26100
KORBA TPS EAST CSPGCL THERMAL-COAL 44000 198673 33880
DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 365808 27570
KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 316500 30420
HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 532878 19410
CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 515 58300
MTTPS CHAMPA U-I CSPGCL THERMAL-COAL 50000 220376 39000
MTTPS CHAMPA U-II CSPGCL THERMAL-COAL 50000 23709 10000
SHP GANGREL CSPGCL HYDRO-HYDRO 1000 2350 36790
BANGO HEP CSPGCL HYDRO-HYDRO 12000 14662 8900
MHP KORBA WEST CSPGCL HYDRO-HYDRO 170 859 38190
SIKASAR HEP CSPGCL HYDRO-HYDRO 700 418 26870
DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8843 74500
DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 19446 51500
GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 66388 71600
GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127488 41300
KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 96072 43900
KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 29841 56400
SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 184966 58800
UKAI 1-5 GSECL THERMAL-COAL 85000 204891 46900
UKAI TPS 6 GSECL THERMAL-COAL 50000 284448 48200
WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 271999 58300
WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 82808 44100
KADANA HPS GSECL HYDRO-HYDRO 24200 34433 16800
UKAI HPS GSECL HYDRO-HYDRO 30500 40585 6100
TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 123000 11500
BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 8900 10900
BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 7200 27500
JHINNA HPS MPPGCL HYDRO-HYDRO 2000 9700 18500
RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 44300 3400
GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 17300 4600
SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 4100 16900
MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 14600 27000
PENCH HPS MPPGCL HYDRO-HYDRO 16000 23700 8100
RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 3000 16900
AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 134400 35100
SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 283800 38700
SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 344600 34300
SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 111600 61600
SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 211800 58000
SSTPS PH-I MPPGCL THERMAL-COAL 120000 233100 84300
BHUSAWAL TPS MSPGCL THERMAL-COAL 142000 566258 51100
CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1365682 33700
KHAPERKHEDA MSPGCL THERMAL-COAL 134000 706207 39100
KORADI TPS MSPGCL THERMAL-COAL 62000 443206 42000
NASIK TPS MSPGCL THERMAL-COAL 63000 297275 47000
PARLI TPS MSPGCL THERMAL-COAL 113000 175934 71600
PARAS MSPGCL THERMAL-COAL 50000 267931 38700
URAN CCPP MSPGCL THERMAL-GAS 67200 320330 30600
KOYANA MSPGCL HYDRO-HYDRO 195600 328155 13100
SMALL HYDRO POWER PLANTS MSPGCL HYDRO-HYDRO 45400 93062 30500
BHIRA MSPGCL HYDRO-HYDRO 8000 10046 8400
TILLARI MSPGCL HYDRO-HYDRO 8900 10584 3100
SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 233298 20500
SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 87633 20500
PRIVATE SECTOR
Page 36
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 81282 46750
JNSTPP(JAYPEE NIGRIE) JP POWER VENTURES LTD THERMAL-COAL 132000 726695 29310
MB POWER MB POWER THERMAL-COAL 120000 345632 38310
ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 754922 28671
ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 780761 23495
ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 198000 1263784 32090
ADANI POWER MAHARA ADANI POWER LTD THERMAL-COAL 330000 1666191 34124
AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 170065 36827
SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 252035 45129
ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 458551 36000
ESSAR POWER MP LTD ESSAR POWER MP LTD THERMAL-COAL 60000 243040 28600
VEDANTA LTD (P P -I) VEDANTA LTD THERMAL-GAS 3000 15044 24000
VEDANTA LTD (P P -II) VEDANTA LTD THERMAL-GAS 3000 21293 24000
PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 8234600 24000
165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 5850 64390
145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 68717 40349
SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 132655 28776
SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 144686 38567
MUNDRA UMPPCOASTAL GUJARAT POWER
LTD THERMAL-IMP COAL 400000 2530300
23900
LANCO AMARKANTAK TPP PATHADIH
U-ILANCO AMARKAN POWER LTD THERMAL-COAL 30000 195500
29200
LANCO AMARKANTAK TPP PATHADIH
U-IILANCO AMARKAN POWER LTD THERMAL-COAL 30000 206900
27600
BARADARHA TPS D B POWER LTD THERMAL-COAL 120000 677373 29200
JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 405000 28900
JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 453000 40500
DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 339437 40700
TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 293400 44000
TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 137200 37000
TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 174900 44000
BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 92900 14100
BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23700 34300
KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 27600 48300
CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2530300 23900
BHANDARDRA HEP -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 2475 54900
SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 161400 26500
SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 445000 39000
SOTHERN REGION
CENTRAL SECTOR
NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 325699 54820
NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 305532 39880
NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 998805 38510
NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 113016 54070
NEYVELI TAMILNADU POWER LTD JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 625274 42200
VALLUR TPS NTPC TECL THERMAL-COAL 150000 856438 42350
R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 1493 84300
RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1502919 29400
RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 341291 31800
SIMHADRI I NTPC LTD THERMAL-COAL 100000 688382 36800
SIMHADRI II NTPC LTD THERMAL-COAL 100000 663657 43400
KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 593110 31324
MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 291625 21764
KKNPP-1 amp 2 NPCIL NUCLEAR-NUCLEAR 200000 572609 40948
MINICOY LAKSHADEEP THERMAL-DIESEL 340 770 29600
KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1097 29600
AMINI LAKSHADEEP THERMAL-DIESEL 265 509 29600
ANDROTT LAKSHADEEP THERMAL-DIESEL 219 524 29600
KALPENI LAKSHADEEP THERMAL-DIESEL 175 356 29600
AGATTI LAKSHADEEP THERMAL-DIESEL 195 658 29600
KADMAT LAKSHADEEP THERMAL-DIESEL 190 414 29600
KILTAN LAKSHADEEP THERMAL-DIESEL 150 269 29600
CHETLET LAKSHADEEP THERMAL-DIESEL 100 139 29600
BITRA LAKSHADEEP THERMAL-DIESEL 043 024 29600
BANGARAM LAKSHADEEP THERMAL-DIESEL 018 009 29600
Page 37
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) STATE SECTOR
Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 721811 46500
Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 50000 336142 46500
RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 237358 46500
RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 239926 46500
RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 124500 46500
SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 62109 46500
UPPER SILERU APGENCO HYDRO-HYDRO 24000 33000 46500
LOWER SILERU APGENCO HYDRO-HYDRO 46000 81066 46500
DONKARAI APGENCO HYDRO-HYDRO 2500 6007 46500
PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 1262 46500
CHETTIPETA APGENCO HYDRO-HYDRO 100 214 46500
MUCHKUND APGENCO HYDRO-HYDRO 12000 37571 46500
NAGARJUNASAGAR RCPH APGENCO HYDRO-HYDRO 9000 606 46500
TUNGABHADRA HES amp HAMPI(AP
Share)
APGENCO HYDRO-HYDRO 7200 6100 46500
KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 352232 42600
KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 288131 32500
KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 319272 46500
RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 40073 44300
KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 308317 46000
KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 308963 51300
SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 61004 76600
NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 17960 75300
PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 20873 58300
POCHAMPAD-I TSPGENCO HYDRO-HYDRO 2700 5455 29800
POCHAMPAD-II TSPGENCO HYDRO-HYDRO 900 1932 40700
NIZAMSAGAR TSPGENCO HYDRO-HYDRO 1000 1126 53400
RAICHUR TPS 1 to 7 KPCL THERMAL-COAL 147000 890866 43800
RAICHUR TPS 8 KPCL THERMAL-COAL 25000 159523 48200
BELLARI TPS 1 KPCL THERMAL-COAL 50000 318679 51100
BELLARI TPS 2 KPCL THERMAL-COAL 50000 232347 55600
BELLARI TPS 3 KPCL THERMAL-COAL 70000 47565 34400
BHADRA PH KPCL HYDRO-HYDRO 3920 2369 45900
GERUSUPPA PH KPCL HYDRO-HYDRO 24000 26990 22000
GHAT PRABHA HEP KPCL HYDRO-HYDRO 3200 4777 25300
KADRA HPS KPCL HYDRO-HYDRO 15000 16889 26800
NAGJHARI KPCL HYDRO-HYDRO 90000 155159 9800
KODASALLI DPH KPCL HYDRO-HYDRO 12000 14854 19200
MUNIRA+MGH+SPH+SPH KPCL HYDRO-HYDRO 22640 48211 7900
SHARAVATHY HPS KPCL HYDRO-HYDRO 108550 276215 5400
ALMATTI DPH KPCL HYDRO-HYDRO 29000 39611 24600
VARAHI UGPH KPCL HYDRO-HYDRO 46000 71368 15600
IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 17196 15300
IDUKKI HPS KSEB HYDRO-HYDRO 78000 137905 15300
KAKKAD HPS KSEB HYDRO-HYDRO 5000 13063 15300
KALLADA HPS KSEB HYDRO-HYDRO 1500 4436 15300
KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 46544 15300
KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 635 15300
LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 30822 15300
MALANKARA HPS KSEB HYDRO-HYDRO 1050 2474 15300
MATTUPETTY KSEB HYDRO-HYDRO 200 230 15300
MALAMPUZHA KSEB HYDRO-HYDRO 250 063 15300
CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 864 15300
URUMI ST I amp II KSEB HYDRO-HYDRO 615 903 15300
LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 248 15300
NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7765 19625 15300
PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 16601 15300
PANNIAR HPS KSEB HYDRO-HYDRO 3240 6217 15300
PORINGALKUTHU KSEB HYDRO-HYDRO 3600 10052 15300
PORINGALKUTHU LBE KSEB HYDRO-HYDRO 1600 9438 15300
PEPPARA KSEB HYDRO-HYDRO 300 395 15300
POOZHITHODE KSEB HYDRO-HYDRO 480 1045 15300
Page 38
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) PEECHI KSEB HYDRO-HYDRO 125 040 15300
RANI-PERUNADU KSEB HYDRO-HYDRO 400 585 15300
SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 79783 15300
SENGULAM HPS KSEB HYDRO-HYDRO 5120 11558 15300
SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 16711 15300
VILANGAD KSEB HYDRO-HYDRO 750 1578 15300
BARAPOLE KSEB HYDRO-HYDRO 1500 1932 15300
VELLATHOOVAL KSEB HYDRO-HYDRO 360 305 15300
CHIM0NY KSEB HYDRO-HYDRO 250 156 15300
ADYANPARA KSEB HYDRO-HYDRO 350 501 15300
BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 554 15300
KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 3801 15300
KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 23132 32800
ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 14416 62280
METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 523970 62280
METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 321270 62280
NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 336575 62280
NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 591240 62280
TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 508966 62280
KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 30897 62280
VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 18720 90699 62280
KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 33593 62280
BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 1047 62280
PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 1250 62280
PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 330 62280
MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 4897 62280
MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 032 62280
KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15681 62280
KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 40608 62280
KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 21342 62280
KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 4717 62280
KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4322 62280
KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2399 62280
METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 4416 62280
METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 8035 62280
BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2187 62280
BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2359 62280
BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2511 62280
BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 1949 62280
BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 1819 62280
POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 172 62280
SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 241 62280
MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 026 62280
THIRUMOORTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 136 62280
PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 9309 62280
VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 353 62280
SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 4192 62280
PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 6571 62280
SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 1186 62280
SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6319 62280
ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 6122 62280
KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 28674 62280
SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 18381 62280
SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 4258 62280
KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 12680 62280
KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4201 62280
ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 000 62280
PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 19175 62280
AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 078 62280
BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 504 62280
BHAVANI KATTALAI (BKB)(IIIampIII BB I amp II)TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 5847 62280
PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 000 62280
Page 39
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) SRI DAMODARAM STPS APPDCL THERMAL-COAL 160000 808108 36300
PRIVATE SECTOR
KARUPPUR TANJORE LANCO TANJORE PCL THERMAL-GAS 12000 48096 28770
SIMHAPURI ENERGY LTD SIMHAPURI ENERGY LTD THERMAL-COAL 60000 143900 39100
JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 7111 45500
SBU 1 JSW ENERGY LTD
VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 26000 159100
43300
SBU 2 JSW ENERGY LTD
VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 60000 247900
42800
LANCO KPLLANCO KONDAPALLI POWER
LTDTHERMAL-GAS 36814 85060
25776
LANCO KPL STG -IILANCO KONDAPALLI POWER
LTDTHERMAL-GAS 36600 12979
46330
LANCO KPL STG -IIIALANCO KONDAPALLI POWER
LTDTHERMAL-GAS 37100 85710
46330
LANCO KPL STG -III BLANCO KONDAPALLI POWER
LTDTHERMAL-GAS 37100 43639
46330
HINDUJA NATIONAL PCL HINDUJA NATIONAL PCL THERMAL-COAL 104000 303000 38200
MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 121164 49940
UDUPI POWER COR LTD ADANI POWER LTD THERMAL-COAL 120000 754613 42500
SPECTRUM POWER GENERATION
LTD SPECTRUM PG LTD THERMAL-GASN 20525 9256812
34952
TAQA NEYVELI POWER COM PVT
LTD TAQA NEYVELI THERMAL-LIG 25000 5840
34500
ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 251000 51000
ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 207860 36800
GMR VEMAGIRI POWER GENERATION
LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 30117
46450
EASTERN REGION
CENTRAL SECTOR
MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 64675 53113
MTPS STAGE - II KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 39000 1432 69138
BOKARO `B` TPS DVC THERMAL-COAL 63000 145670 31539
MEJIA TPS U 1-3 DVC THERMAL-COAL 63000 348298 31552
MEJIA TPS U 4 DVC THERMAL-COAL 21000 116099 34997
MEJIA TPS U 5-6 DVC THERMAL-COAL 50000 276427 35976
MEJIA TPS U 7-8 DVC THERMAL-COAL 100000 552854 36991
DURGAPUR STEEL TPS DVC THERMAL-COAL 100000 665550 39323
DURGAPUR TPS DVC THERMAL-COAL 21000 59270 35416
RAGHUNATHPUR TPS DVC THERMAL-COAL 120000 201650 35326
MAITHON HYDEL STA DVC HYDRO-HYDRO 6320 12200 17984
CHANDRAPURA TPSU1-3 DVC THERMAL-COAL 42000 257610 35095
CHANDRAPURA TPSU7-8 DVC THERMAL-COAL 50000 306673 34987
KODERMA TPS DVC THERMAL-COAL 100000 380180 38131
PANCHET HPS DVC HYDRO-HYDRO 8000 13360 17984
TILLAYA HPS DVC HYDRO-HYDRO 400 1410 17984
RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34700 35400
TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 277300 23200
TLDP -III NHPC LTD HYDRO-HYDRO 13200 55400 62000
TLDP -IV NHPC LTD HYDRO-HYDRO 16000 60300 25600
FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 957219 33700
FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 308943 41000
BONGAINGAON TPS NTPC LTD THERMAL-COAL 25000 153663 58600
KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 542277 34200
KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 942591 34200
BARH-II NTPC LTD THERMAL-COAL 132000 728021 44500
TALCHER TPS NTPC LTD THERMAL-COAL 46000 335521 30100
TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 702319 25600
TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1436521 24700
STATE SECTOR
BTPS(RampM) BIHAR STATE PGCL THERMAL-COAL 22000 12142 39700
BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 98331 10602
HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 50593 9482
CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 19689 2605
RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 53192 6033
UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 147208 14637
Page 40
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 60353 4519
IB TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 288567 25000
J P H GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 210 038 61100
MEYONG CHU GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 400 1086 61100
TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 122667 38200
DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 214339 43321
KOLAGHAT THERMAL POWER
STATION
WEST BENGAL PDCL THERMAL-COAL 126000 538269 31603
BAKRESHWAR THERMAL POWER
PLANT
WEST BENGAL PDCL THERMAL-COAL 105000 634876 32154
BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 45000 166855 33299
SANTHALDIH THERMAL POWER
STATION
WEST BENGAL PDCL THERMAL-COAL 50000 336442 34932
SAGARDIGHI THERMAL POWER
PROJECT
WEST BENGAL PDCL THERMAL-COAL 160000 423121 34705
JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 20344 68900
RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 24559 68900
TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 4623 68900
PURULIA PUMPED STORAGE
PROJECT
WEST BENGAL SEDCL HYDRO-HYDRO 90000 108816 68900
MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2768 68900
PRIVATE SECTOR
CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 49474 20230
CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 555500 70200
HALDIA ENERGY HALDIA ENERGY LTD THERMAL-COAL 60000 371000 50400
DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3688 63400
KAMALANGA TPS GMR KAMALANGA ENERGY LTD THERMAL-COAL 105000547670
33300
ADHUNIK POWER U-1 ADHUNIK POWER THERMAL-COAL 27000 158 44060
ADHUNIK POWER U-2 ADHUNIK POWER THERMAL-COAL 27000 168 44250
VL-JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 332800 23622
JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 43000 45250
JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 71700 37030
JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 70700 35920
JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 71100 38870
JOJOBERA UNIT 5 TATA POWER COM LTD THERMAL-COAL 12000 79300 44560
JOJOBERA UNIT 6 TATA POWER COM LTD THERMAL-WHR 12000 83700 12840
IEL KALINGANAGAR U-I TATA POWER COM LTD THERMAL-WG 6750 33400 22500
IEL KALINGANAGAR U-II TATA POWER COM LTD THERMAL-WG 6750 34800 22500
MAITHON UNIT 1 amp 2 TATA POWER COM LTD THERMAL-COAL 105000 678000 36100
HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 27500 24340
HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 28400 24340
HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 15800 24310
NORTH EASTERN REGION
CENTRAL SECTOR
LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 74100 36600
AGARTALA GT NEEPCO THERMAL-GAS 13500 88611 27210
ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 153111 32310
DOYANG HEP NEEPCO HYDRO-HYDRO 7500 25598 49801
KOPILI HEP NEEPCO HYDRO-HYDRO 20000 98186 11491
KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 19582 20237
KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 10310 17968
RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 124093 22945
TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 10100 17344 39000
STATE SECTOR
HYDRO POWER (122 Stns) ITANAGAR GOVT OF ARUNACHAL
PRADESHHYDRO-HYDRO 6971 6217270
24600
KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39514 17337
LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 82327 36810
NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 33318 48290
MYNTRIANG SHEP ST II ASSAM POWER GENCO HYDRO-HYDRO 300 567 35776
LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 9130 49200
LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 012 49200
DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 022 49200
TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 000 49200
UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 4990 16000
UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 6476 37000
UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 16494 14600
UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 3600 9556 15000
SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 758 8000
MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44070 44800
KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 154 41400
TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 091 41400
MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 411 41400
MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 394 41400
KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 760 41400
SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 3264 41400
LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 044 41400
BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 18953 28000
ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 43585 28200
GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 4080 11100
Note
LIG Lignite N Naptha WHR Waste Heat Recovery
Page 41
File NoCEA-CH-14-1142018-Coordination Division
Chandigarh Delhi Haryana HP JampK Punjab Rajasthan UP Utrakhand Oct-2017 0 0 0 0 516 0 0 0 0
Oct-2018 0 0 0 0 567 0 0 688 0
Chattisgarh Gujarat MP Maharastra Daman amp Diu Dadar Nagar Goa
Oct-2017 16 0 13 2062 0 0 25
Oct-2018 146 19 39 705 1 4 0
AP Telangana Karnataka Kerala Tamil Nadu Puducherry Lakshadweep
Oct-2017 18 19 0 211 38 2 0
Oct-2018 0 0 0 83 414 1 0
8
9 Peak Shortage of Power Supply (MW) in Different Regions in Oct-2018
0 0 0 0
567
0 0
688
00 0 0 0
516
0 0 0 0
0
400
800
Chan
dig
ar
h
Delh
i
Hary
ana
HP
Jamp
K
Pu
nj
ab
Raja
sth
an
UP
Utr
ak
hand
MW
Northern States (MW) Oct-2018 Oct-2017
146
19
39 705
1 4 016
0 13
2062
0 0 25
0
5000
Ch
attis
garh
Guja
rat
MP
Mah
ara
st
ra
Da
man amp
Diu
Da
dar
Na
gar G
oaM
W
Western States (MW) Oct-2018 Oct-2017
0 0 083
414
1 018 19 0
211
38 2 00
500
AP Telangana Karnataka Kerala Tamil Nadu Puducherry Lakshadweep
Southern State (MW) Oct-2018 Oct-2017
File NoCEA-CH-14-1142018-Coordination Division
Bihar DVC Jharkhand Odisha West Bengal Sikkim AampN Island
Oct-2017 6 0 0 0 8 0 4
Oct-2018 0 0 0 400 0 0 4
Arunachal Assam Manipur Meghalaya Mizoram Nagaland Tripura
Oct-2017 6 77 4 0 2 2 12
Oct-2018 13 81 2 0 2 3 0
9
0 0 0
400
0 0 46 0 0 0 8 0 4
0100200300400500
Bih
ar
DV
C
Jha
rkh
an
d
Od
ish
a
We
st
Be
ng
al
Sik
kim
Aamp
NIs
land
MW
Eastern States (MW) Oct-2018 Oct-2017
13
81
2 0 2 3 06 4 0 2 2
12
0
100
Aru
na
ch
al
Assa
m
Ma
nip
ur
Meghal
aya
Miz
ora
m
Na
gala
nd
Trip
ura
MW
North-Eastern States (MW)
File NoCEA-CH-14-1142018-Coordination Division
Sector Oct-2017 Oct-2018
Central 6872 7355
State 5217 6078
Private 6045 6819
ALL INDIA 5882 6524
Month PLF 2017 PLF 2018
Jan 6014 6288
Feb 6153 6285
March 6313 6558
April 6493 6458
May 6355 6554
June 5672 5917
July 537 5545
Aug 5733 5639
Sep 5989 6109
Oct 5882 6524
For Coal and Lignite based Power Plants and Provisional based on Actual-Cum-Assesment
10
PLF of Thermal Power Plants
All India PLF of Thermal Plants (Excluding Gas Based Plants) Month-wise
10 All India PLF Sector-wise for Oct-2018
68
72
52
17
60
45
58
8273
55
60
78
68
19
65
24
000
1000
2000
3000
4000
5000
6000
7000
8000
Central State Private ALL INDIA
P
LF
Oct-2017 Oct-2018
0
10
20
30
40
50
60
70
Jan Feb March April May June July Aug Sep Oct
Months
All India PLF Month-wise
PLF 2017 PLF 2018
File NoCEA-CH-14-1142018-Coordination Division
2012-13 2013-14 2014-15 2015-16 2016-17
TampD Losses 2304 2284 2277 2181 2142
ATampC Losses 2548 2258 2462
Note As per PFC for utilities selling directly to consumers
Total Number of Villages
597464
Note From the year 2004-05 onwards Definition of Village Electrification-
A village would be declared Electrified if
Without
Subsidy
Gap ACS-
ARR(
Without
Subsidy)
Paiseunit
Gap ACS-
ARR (on
subsidy
booked
basis)
paiseunit
Gap ACS-
ARR (on
subsidyrece
ived basis)
paiseunit
2013-14 400 118 76 77
2014-15 412 108 58 60
Source- PFC Reports on the performance of State Power Utilities
2013-14 4894
2014-15 5304
2015-16 5459
2016-17 5743
2017-18 6080
11
Average cost of supply(ACS)
(paiseunit)
i) Basic Infrastructure such as Distribution Transformer and Distribution lines are provided in the inhabited locality
as well as Dalit Basti hemlet where it exists (For electrification through Non-Conventional Energy Sources a
Distribution Transformer may not be necessary)
14 All India Coal consumption for Power Generation (MT)
520
Average Revenue Realization(paiseunit)
518
Year
ii) Electricity is provided to Public places like Schools Panchayat Office Health Centre Dispensaries Community
Centres etc and
iv) Mandatory Certification from Gram Panchayat regarding the completion of village electrification should be
obtained
13 Average cost of Power amp Average Realisation
iii) The number of households electrified should be at least 10 of the total number of households in the village
11 T amp D and ATampC Losses ()
12 All India Village Electrification
Villiages Electrified (Nos)
10000All villages as per census 2011 has
been electrified on 28042018
Villages electrified
File NoCEA-CH-14-1142018-Coordination Division
SN Contents Page
1 Capacity Addition Targets and Achievements in 12th Plan 12
2 Capacity Addition Targets amp Achievements during Oct-2018 and April 2018- Oct 2018 13
3 Installed Capacity in various Regions including their shares 14-19
Section B - Capacity Addition
File NoCEA-CH-14-1142018-Coordination Division
Figures in MW
TARGET ACH TARGET ACH TARGET ACH TARGET ACH
CENTRAL 14878 15869 6004 2584 5300 2000 26182 20453
STATE 13922 22201 1608 2276 0 0 15530 24477
PRIVATE 43540 53661 3285 619 0 0 46825 54280
ALL INDIA 72340 91730 10897 5479 5300 2000 88537 99209
Figures in MW
Thermal Hydro Nuclear Total
Target Ach Target Ach Target Ach Target Ach
Central 4880 3170 800 390 500 6180 3560 5761
State 3546 1760 300 200 0 3846 1960 5096
Private 2940 3780 205 205 0 3145 3985 12671
Total 11366 8710 1305 795 500 0 13171 9505 7217
12
2 CAPACITY ADDITION TARGET AND ACHIEVEMENT FOR 2017-18 (IN MW)
1 Capacity Addtion Targets and Achievements in the 12th Plan
SECTORTHERMAL HYDRO NUCLEAR TOTAL
File NoCEA-CH-14-1142018-Coordination Division
(MW)
Cummulative
Deviation
Target Achievement Target Achievement (+) (-)
Central 2760 250 0 250 0 -250
State 450615 1030 0 1030 69755 -960245
Private 0 0 600 0 600 600
Total 726615 1280 600 1280 669755 -610245
Central 710 0 0 110 110 0
State 130 0 0 12999 30 -9999
Private 0 0 0 0 0 0
Total 840 0 0 23999 140 -9999
Nuclear Central 0 0 0 0 0 0
Central 3470 250 0 360 110 -250
State 463615 1030 0 115999 99755 -1060235
Private 0 0 600 0 600 600
Total 810615 1280 600 151999 809755 -710235
Electricity Generation (MU) Targets and Achievements for 2016-17
13
2 Capacity Addition Targets Achievements During Oct-2018
Schemes Sector
Target 2018-19
April 2018- Oct 2018Oct-18
Hydro
All India
Capacity Addition TargetsAchievements during the Month of Oct-2018
Thermal
12
80
24
0
0
15
20
67
0
14
0
0
81
0
0
200
400
600
800
1000
1200
1400
1600
Thermal Hydro Nuclear Total
MW
Targets and Achievement during 2018-19Target Achievement
600
0 00 0
600
0
100
200
300
400
500
600
700
800
900
1000
Target Achievement
MW
Targets and Achievement during Oct 2018Thermal Hydro
Nuclear Total
File NoCEA-CH-14-1142018-Coordination Division
Coal Gas Diesel Total
State 1593400 287920 000 1881320 000 869755 68956 2820031
Private 2276083 55800 000 2331883 000 251400 1261535 3844818
Central 1258537 234406 000 1492943 162000 849622 32900 2537465
Sub Total 5128020 578126 000 5706146 162000 1970777 1363391 9202314
State 2128000 284982 000 2412982 000 544650 31119 2988751
Private 3488567 467600 000 3956167 000 48100 2005170 6009437
Central 1504295 328067 000 1832362 184000 162000 66130 2244492
Sub Total 7120862 1080649 000 8201511 184000 754750 2102418 11242679
State 1943250 79198 28788 2051236 000 1183803 52102 3287141
Private 1212450 532210 47370 1792030 000 000 3495815 5287845
Central 1422502 35958 000 1458460 332000 000 49190 1839650
Sub Total 4578202 647366 76158 5301726 332000 1183803 3597107 10414636
State 695000 10000 000 705000 000 353792 22511 1081303
Private 637500 000 000 637500 000 39900 84853 762253
Central 1387664 000 000 1387664 000 100520 1000 1489184
Sub Total 2720164 10000 000 2730164 000 494212 108364 3332740
State 000 49771 3600 53371 000 42200 25674 121245
Private 000 2450 000 2450 000 000 2571 5021
Central 52002 125360 000 177362 000 103000 500 280862
Sub Total 52002 177581 3600 233183 000 145200 28745 407128
State 000 000 4005 4005 000 000 525 4530
Private 000 000 000 000 000 000 221 221
Central 000 000 000 000 000 000 510 510
Sub Total 000 000 4005 4005 000 000 1256 5261
State 6359650 711871 36393 7107913 000 2994200 200887 10303000
Private 7614600 1058060 47370 8720030 000 339400 6850164 15909594
Central 5625000 723791 000 6348791 678000 1215142 150230 8392163
Total 19599250 2493722 83763 22176734 678000 4548742 7201281 34604757
Figures at decimal may not tally due to rounding off
Note -
(As per latest information available with MNRE)
Break up of RES all India as on 30092018 is given below (in MW)
450695 3461510 2402166 7201281
A Oct 2018 669755 MW
B Capacity Retired
during
Oct 2018 705 MW
C Oct 2018 0 MW
D Oct 2018 A-B+C -35245 MW
Share of Telangana from JEGURUPADU CCPP Ph II has been removed and the same has been added to private sector of Andhra Pradesh due to expiry of PPA as per
request from TS Transco
Region
ALL INDIA INSTALLED CAPACITY (IN MW) OF POWER STATIONS (As on 31102018)
(UTILITIES)
Net Capacity Added during
1 RES include SHP BP UampI Solar and Wind Energy Installed capacity in respect of RES (MNRE) as on 30092018
Small
Hydro PowerWind Power
Bio-PowerSolar Power
Total
CapacityBM PowerCogen Waste to Energy
2 U-1 to 7 (76995=69755 MW) of LAKWA REPLACEMENT POWER PROJECT commissioned in April 2018 but intimated in October 2018
has been added to state sector of Assam
1 Badarpur TPS (705 MW) has been retired from central sector of Northern Region
Capacity Up-rated
Ownership Sector
873080 13830
Capacity Added during
1 U-2 (600 MW) of MAHAN TPP has been commissioned and added to private sector of Madhya Pradesh
Grand TotalThermalNuclear Hydro
Islands
ALL INDIA
Abbreviation- SHP=Small Hydro Project (le 25 MW) BP=Biomass Power UampI=Urban amp Industrial Waste Power RES=Renewable Energy Sources
Northern Region
Western Region
Southern Region
Eastern Region
North Eastern
Region
RES
(MNRE)
Modewise breakup
File NoCEA-CH-14-1142018-Coordination Division
Coal Gas Diesel Total
State 13500 180040 000 193540 000 000 000 193540
Private 86922 10800 000 97722 000 000 12157 109879
Central 311272 20701 000 331973 10283 72309 000 414565
Sub-Total 411694 211541 000 623235 10283 72309 12157 717984
State 272000 15000 000 287000 000 110282 5930 403212
Private 408078 000 000 408078 000 20000 34745 462823
Central 129472 53561 000 183034 10094 66370181 500 259998
Sub-Total 809550 68561 000 878112 10094 196652 41175 1126032
State 000 000 000 000 000 69460 25661 95121
Private 000 000 000 000 000 99200 60536 159736
Central 18340 6201 000 24541 2895 122388 000 149824
Sub-Total 18340 6201 000 24541 2895 291048 86197 404681
State 000 17500 000 17500 000 123000 12903 153403
Private 000 000 000 000 000 000 5985 5985
Central 50639 12907 000 63547 6798 109188 000 179533
Sub-Total 50639 30407 000 81047 6798 232188 18888 338921
State 176000 15000 000 191000 000 259770 12780 463550
Private 511550 000 000 511550 000 28800 115462 655812
Central 85458 26401 000 111859 19681 92342 000 223882
Sub-Total 773008 41401 000 814409 19681 380912 128242 1343244
State 585000 60380 000 645380 000 109618 2385 757383
Private 388200 000 000 388200 000 10400 710680 1109280
Central 120625 22110 000 142735 55674 73901 29400 301710
Sub-Total 1093825 82490 000 1176315 55674 193919 742465 2168373
State 546900 000 000 546900 000 72410 2510 621820
Private 871433 000 000 871433 000 84200 266691 1222324
Central 379639 54949 000 434588 28948 180253 3000 646789
Sub-Total 1797972 54949 000 1852921 28948 336863 272201 2490933
State 000 000 000 000 000 125215 6787 132002
Private 9900 45000 000 54900 000 8800 52244 115944
Central 34324 6966 000 41290 3124 47554 000 91968
Sub-Total 44224 51966 000 96190 3124 181569 59031 339914
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 3035 3035
Central 3815 1503 000 5317 801 10171 000 16289
Sub-Total 3815 1503 000 5317 801 10171 3035 19324
124953 29105 000 154058 23703 75145 000 252907
State 1593400 287920 000 1881320 000 869755 68956 2820031
Private 2276083 55800 000 2331883 000 251400 1261535 3844818
Central 1258537 234406 000 1492943 162000 849622 32900 2537465
Grand Total 5128020 578126 000 5706146 162000 1970777 1363391 9202314
Uttar Pradesh
Uttarakhand
Chandigarh
Grand TotalThermalNuclear
Hydro
(Renewable)
RES
(MNRE)
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
NORTHERN REGION
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
(As on 31102018)
Central - Unallocated
Total (Northern
Region)
Delhi
Haryana
Himachal Pradesh
Jammu amp Kashmir
Punjab
Rajasthan
State Ownership Sector
Modewise breakup
File NoCEA-CH-14-1142018-Coordination Division
(As on 31102018)
Coal Gas Diesel Total
State 000 000 000 000 000 000 005 005
Private 000 4800 000 4800 000 000 091 4891
Central 45478 1967 000 47445 2600 000 000 50045
Sub-Total 45478 6767 000 52245 2600 000 096 54941
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 1301 1301
Central 12663 4334 000 16997 700 000 000 17697
Sub-Total 12663 4334 000 16997 700 000 1301 18998
State 475000 217782 000 692782 000 77200 800 770782
Private 776567 396000 000 1172567 000 000 729782 1902349
Central 309051 42400 000 351451 55900 000 23830 431181
Sub-Total 1560618 656182 000 2216800 55900 77200 754412 3104312
State 408000 000 000 408000 000 170366 8396 586762
Private 617400 10000 000 627400 000 000 378205 1005605
Central 279441 25700 000 305141 27300 152000 30000 514441
Sub-Total 1304841 35700 000 1340541 27300 322366 416601 2106808
State 228000 000 000 228000 000 12000 1105 241105
Private 849000 000 000 849000 000 000 52430 901430
Central 195344 000 000 195344 4800 10000 000 210144
Sub-Total 1272344 000 000 1272344 4800 22000 53535 1352679
State 1017000 67200 000 1084200 000 285084 20813 1390097
Private 1245600 56800 000 1302400 000 48100 842815 2193315
Central 433475 227273 000 660748 69000 000 12300 742048
Sub-Total 2696075 351273 000 3047348 69000 333184 875927 4325459
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 546 546
Central 17444 6634 000 24078 900 000 000 24978
Sub-Total 17444 6634 000 24078 900 000 546 25524
211400 19759 000 231159 22800 000 000 253959
State 2128000 284982 000 2412982 000 544650 31119 2988751
Private 3488567 467600 000 3956167 000 48100 2005170 6009437
Central 1504295 328067 000 1832362 184000 162000 66130 2244492
Grand Total 7120862 1080649 000 8201511 184000 754750 2102418 11242679
Central - Unallocated
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
WESTERN REGION
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
State Ownership Sector
Modewise breakup
Grand TotalThermalNuclear
Hydro
(Renewable)
RES
(MNRE)
Total (Western
Region)
Goa
Daman amp Diu
Gujarat
Madhya Pradesh
Chhattisgarh
Maharashtra
Dadra amp Nagar
Naveli
File NoCEA-CH-14-1142018-Coordination Division
(As on 31102018)
Coal Gas Diesel Total
State 501000 23540 000 524540 000 167360 4875 696775
Private 387388 381318 3680 772386 000 000 693073 1465459
Central 167456 000 000 167456 12727 000 25000 205183
Sub-Total 1055844 404858 3680 1464382 12727 167360 722948 2367417
State 508250 000 000 508250 000 247993 4022 760265
Private 83945 83182 000 167127 000 000 375048 542175
Central 195612 000 000 195612 14873 000 1000 211485
Sub-Total 787807 83182 000 870989 14873 247993 380070 1513925
State 502000 000 12792 514792 000 359980 15533 890305
Private 195850 000 2520 198370 000 000 1275640 1474010
Central 282920 000 000 282920 69800 000 000 352720
Sub-Total 980770 000 15312 996082 69800 359980 1291173 2717035
State 000 000 15996 15996 000 188150 15402 219548
Private 61500 17400 000 78900 000 000 20899 99799
Central 114322 35958 000 150280 36200 000 5000 191480
Sub-Total 175822 53358 15996 245176 36200 188150 41301 510827
State 432000 52408 000 484408 000 220320 12270 716998
Private 483767 50310 41170 575247 000 000 1130984 1706231
Central 448952 000 000 448952 144800 000 18190 611942
Sub-Total 1364719 102718 41170 1508607 144800 220320 1161444 3035171
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 000 000
Central 10000 000 000 10000 000 000 000 10000
Sub-Total 10000 000 000 10000 000 000 000 10000
State 000 3250 000 3250 000 000 000 3250
Private 000 000 000 000 000 000 171 171
Central 24840 000 000 24840 8600 000 000 33440
Sub-Total 24840 3250 000 28090 8600 000 171 36861
178400 000 000 178400 45000 000 000 223400
State 1943250 79198 28788 2051236 000 1183803 52102 3287141
Private 1212450 532210 47370 1792030 000 000 3495815 5287845
Central 1422502 35958 000 1458460 332000 000 49190 1839650
Grand Total 4578202 647366 76158 5301726 332000 1183803 3597107 10414636
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
SOUTHERN REGION
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
State Ownership Sector
Modewise breakup
Grand TotalThermal RES
(MNRE)Nuclear
Hydro
(Renewable)
Kerala
Tamil Nadu
NLC
Puducherry
Central - Unallocated
Total (Southern
Region)
Andhra Pradesh
Telangana
Karnataka
File NoCEA-CH-14-1142018-Coordination Division
(As on 31102018)
Coal Gas Diesel Total
State 71000 000 000 71000 000 000 7070 78070
Private 28100 000 000 28100 000 000 25545 53645
Central 291433 000 000 291433 000 11000 000 302432
Sub-Total 390533 000 000 390533 000 11000 32615 434147
State 42000 000 000 42000 000 13000 405 55405
Private 73000 000 000 73000 000 000 3207 76207
Central 39374 000 000 39374 000 6100 000 45474
Sub-Total 154374 000 000 154374 000 19100 3612 177086
State 540000 10000 000 550000 000 98600 9195 657795
Private 242500 000 000 242500 000 000 34452 276952
Central 76077 000 000 76077 000 41000 000 117077
Sub-Total 858577 10000 000 868577 000 139600 43647 1051824
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 000 000
Central 698504 000 000 698504 000 18620 000 717124
Sub-Total 698504 000 000 698504 000 18620 000 717124
State 42000 000 000 42000 000 206192 630 248822
Private 293900 000 000 293900 000 000 21648 315548
Central 163390 000 000 163390 000 8900 1000 173290
Sub-Total 499290 000 000 499290 000 215092 23278 737660
State 000 000 000 000 000 36000 5211 41211
Private 000 000 000 000 000 39900 001 39901
Central 8703 000 000 8703 000 6400 000 15103
Sub-Total 8703 000 000 8703 000 82300 5212 96215
110183 000 000 110183 000 8501 000 118684
State 695000 10000 000 705000 000 353792 22511 1081303
Private 637500 000 000 637500 000 39900 84853 762253
Central 1387664 000 000 1387664 000 100520 1000 1489184
Grand Total 2720164 10000 000 2730164 000 494212 108364 3332740
(As on 31102018)
Coal Gas Diesel Total
State 000 32821 000 32821 000 10000 3001 45822
Private 000 2450 000 2450 000 000 1680 4130
Central 27902 43556 000 71458 000 36851 000 108309
Sub-Total 27902 78827 000 106729 000 46851 4681 158261
State 000 000 000 000 000 000 10710 10710
Private 000 000 000 000 000 000 539 539
Central 2470 4682 000 7152 000 11800 000 18952
Sub-Total 2470 4682 000 7152 000 11800 11249 30201
State 000 000 000 000 000 32200 3103 35303
Private 000 000 000 000 000 000 006 006
Central 3040 10969 000 14009 000 7446 000 21455
Sub-Total 3040 10969 000 14009 000 39646 3109 56764
State 000 16950 000 16950 000 000 1601 18551
Private 000 000 000 000 000 000 009 009
Central 3740 43695 000 47435 000 7077 500 55012
Sub-Total 3740 60645 000 64385 000 7077 2110 73572
State 000 000 3600 3600 000 000 545 4145
Private 000 000 000 000 000 000 217 217
Central 3140 7157 000 10297 000 9677 000 19974
Sub-Total 3140 7157 3600 13897 000 9677 762 24336
State 000 000 000 000 000 000 3067 3067
Private 000 000 000 000 000 000 100 100
Central 2140 4893 000 7033 000 5860 000 12893
Sub-Total 2140 4893 000 7033 000 5860 3167 16060
State 000 000 000 000 000 000 3647 3647
Private 000 000 000 000 000 000 020 020
Central 2070 4046 000 6116 000 9913 000 16029
Sub-Total 2070 4046 000 6116 000 9913 3667 19696
7500 6362 000 13862 000 14376 000 28238
State 000 49771 3600 53371 000 42200 25674 121245
Private 000 2450 000 2450 000 000 2571 5021
Central 52002 125360 000 177362 000 103000 500 280862
Grand Total 52002 177581 3600 233183 000 145200 28745 407128
Central - Unallocated
Total (Eastern
Region)
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
NORTH-EASTERN REGION
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
State Ownership Sector
Modewise breakup
Grand TotalThermalNuclear
Bihar
Jharkhand
West Bengal
DVC
Odisha
Sikkim
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
EASTERN REGION
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
Ownership Sector
Modewise breakup
Grand TotalThermalNuclear
Hydro
(Renewable)
RES
(MNRE)
Manipur
Nagaland
State
Mizoram
Central - Unallocated
Total (North-
Eastern Region)
Hydro
(Renewable)
RES
(MNRE)
Assam
Arunachal Pradesh
Meghalaya
Tripura
File NoCEA-CH-14-1142018-Coordination Division
(As on 31102018)
Coal Gas Diesel Total
State 000 000 4005 4005 000 000 525 4530
Private 000 000 000 000 000 000 146 146
Central 000 000 000 000 000 000 510 510
Sub-Total 000 000 4005 4005 000 000 1181 5186
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 075 075
Central 000 000 000 000 000 000 000 000
Sub-Total 000 000 000 000 000 000 075 075
State 000 000 4005 4005 000 000 525 4530
Private 000 000 000 000 000 000 221 221
Central 000 000 000 000 000 000 510 510
Grand Total 000 000 4005 4005 000 000 1256 5261
19
Andaman amp
Nicobar
lakshadweep
Total (Islands)
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
State Ownership Sector
Modewise breakup
Grand TotalThermalNuclear
Hydro
(Renewable)
RES
(MNRE)
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
ISLANDS
File NoCEA-CH-14-1142018-Coordination Division
SrNo Contents Page
1 Executive summary of Target and Achievement of Transmission Lines during 2018-19
20(1)
2 List of Transmission Lines CommissionedReady for commissioning during Oct-2018 20(2)
Section C - Transmission Lines
File NoCEA-CH-14-1142018-Coordination Division
Executive summary of Target and Achievement of Transmission Lines during 2018-19 As on Oct-18
(All figures in circuit kms)
Centr
al S
ecto
r
Sta
te S
ecto
r
JV
Private
Secto
r
To
tal
Centr
al S
ecto
r
Sta
te S
ecto
r
JV
Private
Secto
r
To
tal
Centr
al S
ecto
r
Sta
te S
ecto
r
JV
Private
Secto
r
To
tal
Centr
al S
ecto
r
Sta
te S
ecto
r
JV
Private
Secto
r
To
tal
Centr
al S
ecto
r
Sta
te S
ecto
r
JV
Private
Secto
r
To
tal
Cen
tral S
ecto
r
Sta
te S
ecto
r
JV
Pri
vate
Secto
r
Gra
nd
To
tal
0 0 0 0 0 0 0 0 4692 766 827 6285 3045 5906 980 9931 553 5878 0 6431 8290 12550 1807 22647
Oct18 Programme 0 0 0 0 0 0 0 0 300 0 0 300 662 90 562 1314 0 723 0 723 962 813 562 2337
Achievement 0 0 0 0 0 0 0 0 729 0 0 729 471 266 0 737 0 401 0 401 1200 667 0 1867
Upto Oct-18 Programme 0 0 0 0 0 0 0 0 3004 416 0 3420 1350 3109 562 5021 481 4346 0 4827 4835 7871 562 13268
Achievement 0 0 0 0 0 0 0 0 2286 0 178 2464 1436 1783 1595 4814 60 4461 0 4521 3782 6244 1773 11799
20(1)
220 kV Grand Total 800 kV 500 kV
Programme 2018-19
Programme
Achievement
HVDC765 kV 400 kV
File NoCEA-CH-14-1142018-Coordination Division
SlNo Line
Length
(cKM)
1 2 3 4 5 6
1 765 Jharsuguda - Dharamjaygarh line DC PGCIL 296
2 765LILO of Kurnool - Thirvualam line at
CuddapahDC PGCIL 190
3 765 Salem PS - Madhugiri PS line SC PGCIL 243
4 400 Cuddapah - Hindupur line (Q) DC PGCIL 338
5 400LILO of Both Ckt of Bamnauli - Samaypur at
TughlakabadMC PGCIL 114
6 400LILO-Out of Cuddapah - Hindupur line (Q)
(Both Ckts) at NP Kunta ssDC PGCIL 19
1200
7 400LILO of Sterlite - Meramundali at Lapanga
4oo kV ssDC OPTCL 14
8 400 Sterlite - Lapanga line DC OPTCL 37
9 400 TMDC Podili - Sattapenalli line DC APTRANSCO 215
10 230Neyveli 230110 kV ss - Eachangadu
230kV FeederSC TANTRANSCO 1
11 230 NNTPS - Neyveli 230110kV ss DC TANTRANSCO 2
12 220 Ajmer (400 kV) - Bherunda (TK) DC RVPNL 100
13 220 Aligarh - Atrauli line DC UPPTCL 77
14 220 Khandwa - Chhanera line DC MPPTCL 78
15 220LILO of one Ckt of Hadala - Sartanpar line
at Wankaner on MC towersDC GETCO 6
16 220 LILO of one Ckt of Vita - Miraj at Alkud ss DC MSETCL 27
17 220 Mendhigiri - Alkud ss DC MSETCL 110
667
1867
20(2)
Grand Total
2Transmission Lines (220 kV and above) CommissionedReady for commissioning During Oct-2018
As on 31-10-18
Voltage
Level (kV)Name of Transmission Lines
Circuit
Type
Executing
Agency
CENTRAL SECTOR
Total of CENTRAL SECTOR
STATE SECTOR Sector
Total of STATE SECTOR
File NoCEA-CH-14-1142018-Coordination Division
SN Contents Page
1 Executive summary of Target and Achievement of Substations during 2018-19 21(1)
2Sub Stations (220 kV and above) commissionedready for commisssioning during Oct-
201821(2)
Section D - Sub Stations
File NoCEA-CH-14-1142018-Coordination Division
1 Executive summary of Target and Achievement of Substations during 2018-19 As on Oct-18
(All figures in circuit MVA)
Centr
al S
ecto
r
Sta
te S
ecto
r
JV
Private
Secto
r
To
tal
Centr
al S
ecto
r
Sta
te S
ecto
r
JV
Private
Secto
r
To
tal
Centr
al S
ecto
r
Sta
te S
ecto
r
JV
Private
Secto
r
To
tal
Centr
al S
ecto
r
Sta
te S
ecto
r
JV
Private
Secto
r
To
tal
Centr
al S
ecto
r
Sta
te S
ecto
r
JV
Private
Secto
r
To
tal
Cen
tral S
ecto
r
Sta
te S
ecto
r
JV
Pri
vate
Secto
r
Gra
nd
To
tal
3000 0 0 3000 0 0 0 0 22200 0 0 22200 8185 13085 630 21900 740 14760 0 15500 34125 27845 630 62600
Oct18 Programme 0 0 0 0 0 0 0 0 0 0 0 0 1000 1260 630 2890 0 1400 0 1400 1000 2660 630 4290
Achievement 0 0 0 0 0 0 0 0 3000 0 0 3000 1500 3120 0 4620 0 2220 0 2220 4500 5340 0 9840
Upto Oct-18 Programme 0 0 0 0 0 0 0 0 10000 0 0 10000 6130 7435 630 14195 0 9670 0 9670 16130 17105 630 33865
Achievement 0 0 0 0 0 0 0 0 14000 0 0 14000 9000 7550 630 17180 0 10610 0 10610 23000 18160 630 41790
21(1)
220 kV Grand Total 800 kV 500 kV
Programme 2018-19
Programme
Achievement
HVDC765 kV 400 kV
File NoCEA-CH-14-1142018-Coordination Division
As on 31-10-18
Sl Voltage Ratio Capacity
No (kVkV) (MWMVA)
1 2 3 4 5
1 Cuddapah Ss 765400 PGCIL 3000
2 Tughlakabad SS (GIS) 400220 PGCIL 1500
Total of CENTRAL SECTOR 4500
3 Panki Kanpur (Aug) TF-I 400200 UPPTCL 75
4 Hindupur ss (1st ICT) 400220 APTRANSCO 315
5 Thappagundu ss 400110 TANTRANSCO 600
6 Mendhasal (2nd power TF) 400220 OPTCL 20
7 Jodhpur ss (New) 400220 RVPNL 315
8 Shankarpally 400220 TSTRANSCO 500
9 Podili ss (1st ICT) 400220 APTRANSCO 315
10 Doni (Gadag)SS 400220 KPTCL 1000
11 Porur (Addl TF) 230110 TANTRANSCO 100
12 Anuppankulam (Addl TF) 230110 TANTRANSCO 60
13 Neyveli SS 230110 TANTRANSCO 480
14 Savarkundla (Aug) 22066 GETCO 60
15 Bhuna (Aug) 220132 HVPNL 100
16 Madanpur (Aug) 22066 HVPNL 100
17 Gurgaon Sec-52A (Aug) 22066 HVPNL 160
18 IA Hisar (Aug) 220132 HVPNL 50
19 Narwana (Aug) 220132 HVPNL 60
20 Therubali (3rd Auto TF) 220132 OPTCL 160
21 Halasar ss 220132 RVPNL 160
22 Bansi Siddaharthnagar (Aug) TF-I 220132 UPPTCL 60
23 Hata Kushinagar (New) TF-I 220132 UPPTCL 100
24 Gomti nagar Lucknow (Aug) TF-IV 22033 UPPTCL 60
25 Kanpur Road Lucknow (New) TF-III 22033 UPPTCL 60
26 Asoj (Aug) 22066 GETCO 150
27 Kangasiyali (Aug) 22066 GETCO 60
28 Karmsad (Aug) 22066 GETCO 160
29 Lalpar (Aug) 22066 GETCO 60
TOTAL STATE SECTOR 5340
GRAND TOTAL 9840
21(2)
PRIVATE SECTOR
CENTRAL SECTOR
STATE SECTOR
2Sub-Stations (220 kV and above) CommissionedReady for commissioning During Oct-2018
Name of Sub StationsExecuting
Agency
File NoCEA-CH-14-1142018-Coordination Division
SN Contents Page
1 Electricity Generation (MU) Targets and Achievements for 2018-19 22
Section E - Electricity Generation
File NoCEA-CH-14-1142018-Coordination Division
Programme Achievement Ach Programme Achievement Ach
Central Sector 35160700 3028100 3162321 10443 20144400 21150469 10499
State Sector 35132000 3010000 3017260 10024 19922100 19549030 9813
PvtIPP Sector 36999700 3240600 3375603 10417 21598300 20794155 9628
PvtUTL Sector 1857600 164500 180597 10979 1130900 1203107 10638
Total 109150000 9443200 9735781 10310 62795700 62696761 9984
Central Sector 5617600 420900 451004 10715 4193000 4045436 9648
State Sector 6110600 559500 708469 12663 4049400 4433000 10947
PvtIPP Sector 1141800 80500 90122 11195 976400 1021963 10467
PvtUTL Sector 130000 11300 12564 11119 76700 99943 13030
Total 13000000 1072200 1262159 11772 9295500 9600342 10328
Central Sector 3850000 353300 303310 8585 2068900 2203540 10651
Total 3850000 353300 303310 8585 2068900 2203540 10651
Bhutan Import 500000 63300 35395 5592 347000 416660 12007
Central Sector 44628300 3802300 3916635 10301 26406300 27399445 10376
State Sector 41242600 3569500 3725729 10438 23971500 23982030 10004
Pvt Sector 40129100 3496900 3658886 10463 23782300 23119168 9721
Total 126500000 10932000 11336645 10370 74507100 74917303 10055
Provisional based on actual-cum-Assesment
Figs in MU
Cummulative
Achievement
Cummulative
Achievement
Sep-18 Sep-17 Upto Sep-2018 Upto Sep-2017
1073794 748889 7332680 5660929
22
Renewable Energy Generation
Achievement
Oct-2018
1 Electricity Generation (MU) Targets and Achievememts for 2018-19
All India Energy Generation During April 2018- Oct 2018 (MU)
Target (2018-19)April 2018- Oct 2018
Sector
Hydro
Thermal
Nuclear
627957
92955
20689
745071
626968
96003
22035
749173
0
100000
200000
300000
400000
500000
600000
700000
800000
Thermal Hydro Nuclear Total
Programme
Achievement
File NoCEA-CH-14-1142018-Coordination Division
SN Contents Page
1 Energy Power Supply Position (Provisional) for Oct-2018 and during April 2018- Oct 2018 23
2 Peak Power Supply Position (Provisional) for Oct-2018 and during April 2018- Oct 2018 24
3 Energy Power Supply Position (Revised) for Sep-2018 and during April 2018- Sept 2018 25
4 Peak Power Supply Position (Revised) for Sep-2018 and during April 2018- Sept 2018 26
5 Notified Power cuts Restrictions on Industries during Oct-2018 27
6 Power Supply to Agricultural Sector during Oct-2018 28
Section F - Power supply position
File NoCEA-CH-14-1142018-Coordination Division
आकड़ मममलयन यननट नट Figures in MU net
ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied
कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )
चडीगढ़ Chandigarh 108 108 0 00 1055 1055 0 00
दिलली Delhi 2490 2489 1 00 22524 22510 14 01
हरियजणज Haryana 4554 4554 0 00 35205 35205 0 00
दहमजचल परिश Himachal Pradesh 788 787 2 02 5728 5560 168 29
रमम कशमीि Jammu amp Kashmir 1497 1219 278 186 10982 8865 2117 193
परजब Punjab 4418 4418 0 00 38832 38819 13 00
िजरसथजन Rajasthan 6748 6748 0 00 45341 45181 160 04
उतति परिश Uttar Pradesh 10136 9973 164 16 75485 74808 676 09
उततिजखड Uttarakhand 1083 1081 3 03 8395 8310 85 10
उततरी कषतर Northern Region 31822 31375 447 14 243547 240314 3233 13
छततीसगढ़ Chhattisgarh 2454 2453 1 00 16119 16091 28 02
गरिजत Gujarat 11636 11636 0 00 70782 70768 14 00
मधय परिश Madhya Pradesh 5860 5859 1 00 38412 38410 2 00
महजिजषटर Maharashtra 15223 15095 128 08 95489 95355 134 01
िमन औि दिउ Daman amp Diu 216 216 0 00 1523 1523 0 00
िजिि व नगि हवली Dadra amp Nagar Haveli 553 553 0 00 3757 3757 0 00
गोवज Goa 366 366 0 00 2497 2495 2 01
पशचिमी कषतर Western Region 36308 36178 130 04 228579 228398 180 01
आनधर परिश Andhra Pradesh 5860 5854 6 01 37377 37334 43 01
तलगजनज Telangana 6748 6742 6 01 38251 38205 46 01
कनजाटक Karnataka 5842 5835 7 01 39111 39059 52 01
किल Kerala 2116 2096 20 09 14256 14160 96 07
तममल नजड Tamil Nadu 8611 8601 10 01 65742 65666 76 01
पडचिी Puducherry 216 215 1 05 1654 1646 8 05
लकष-दवीप Lakshadweep 4 4 0 0 27 27 0 0
दकषकषणी कषतर Southern Region 29392 29342 50 02 196390 196069 321 02
बबहजि Bihar 2742 2738 4 01 19143 18951 192 10
िजमोिि घजटी ननगम DVC 1712 1698 13 08 13096 12828 268 20
झजिखणड Jharkhand 701 697 4 06 5022 4949 73 15
ओडडशज Odisha 3147 3134 13 04 20224 20192 32 02
पशशचम बगजल West Bengal 4204 4200 4 01 33008 32881 127 04
मसशककम Sikkim 40 40 0 00 279 279 0 01
अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 67 202 188 13 67
परवी कषतर Eastern Region 12547 12507 40 03 90772 90080 692 08
अरणजचल परिश Arunachal Pradesh 67 66 1 09 502 496 7 13
असम Assam 833 809 24 29 6153 5903 250 41
मणणपि Manipur 72 71 1 10 485 478 7 14
मघजलय Meghalaya 147 147 0 00 1043 1042 0 00
ममज़ोिम Mizoram 63 62 1 08 365 359 5 14
नजगजलड Nagaland 76 67 8 110 540 481 59 109
बिपिज Tripura 130 129 1 09 1025 1007 19 18
उततर-परवी कषतर North-Eastern Region 1387 1351 35 25 10113 9766 346 34
समपणण भारत All India 111455 110753 702 06 769399 764627 4773 06
23
ऊराण वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Energy Power Supply Position Report (Provisional)
राजयStateअकरबर2018 October2018 अपरल2018 -अकरबर2018 April2018 to October2018
ऊरजा पनत ा म कमी ऊरजा पनत ा म कमीEnergy not Supplied
Excludes energy exported to Bangladesh
Energy not Supplied
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
File NoCEA-CH-14-1142018-Coordination Division
अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met
कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )
चडीगढ़ Chandigarh 217 217 0 00 369 369 0 00
दिलली Delhi 4713 4713 0 00 7016 7016 0 00
हरियजणज Haryana 7948 7948 0 00 10270 10270 0 00
दहमजचल परिश Himachal Pradesh 1520 1520 0 00 1520 1520 0 00
रमम कशमीि Jammu amp Kashmir 2836 2269 567 200 2951 2361 590 200
परजब Punjab 7979 7979 0 00 12638 12638 0 00
िजरसथजन Rajasthan 11450 11450 0 00 11698 11698 0 00
उतति परिश Uttar Pradesh 17434 16745 688 39 20498 20062 436 21
उततिजखड Uttarakhand 1943 1943 0 00 2143 2143 0 00
उततरी कषतर Northern Region 50659 49635 1024 20 63166 61726 1440 23
छततीसगढ़ Chhattisgarh 4414 4268 146 33 4414 4268 146 33
गरिजत Gujarat 18148 18130 19 01 18148 18130 19 01
मधय परिश Madhya Pradesh 11356 11317 39 03 11356 11317 39 03
महजिजषटर Maharashtra 23864 23159 705 30 23864 23254 610 26
िमन औि दिउ Daman amp Diu 342 341 1 02 357 356 1 02
िजिि व नगि हवली Dadra amp Nagar Haveli 784 780 4 05 816 815 1 01
गोवज Goa 536 536 0 00 596 596 0 00
पशचिमी कषतर Western Region 56548 55695 853 15 56548 55695 853 15
आनधर परिश Andhra Pradesh 9435 9435 0 00 9435 9435 0 00
तलगजनज Telangana 10603 10603 0 00 10815 10815 0 00
कनजाटक Karnataka 10741 10741 0 00 10741 10741 0 00
किल Kerala 3727 3644 83 22 4050 3997 53 13
तममल नजड Tamil Nadu 14747 14333 414 28 15029 14981 47 03
पडचिी Puducherry 363 362 1 03 420 400 19 46
लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0
दकषकषणी कषतर Southern Region 45279 45226 53 01 45946 45684 262 06
बबहजि Bihar 4945 4945 0 00 5050 5045 5 01
िजमोिि घजटी ननगम DVC 2729 2729 0 00 2874 2874 0 00
झजिखणड Jharkhand 1260 1260 0 00 1339 1284 55 41
ओडडशज Odisha 5624 5224 400 71 5624 5357 268 48
पशशचम बगजल West Bengal 8775 8775 0 00 9130 9123 7 01
मसशककम Sikkim 86 86 0 00 90 90 0 00
अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7
परवी कषतर Eastern Region 22959 22567 392 17 22959 22567 392 17
अरणजचल परिश Arunachal Pradesh 138 125 13 94 138 133 5 37
असम Assam 1785 1704 81 45 1865 1809 56 30
मणणपि Manipur 187 185 2 11 193 186 7 36
मघजलय Meghalaya 336 336 0 00 371 368 2 07
ममज़ोिम Mizoram 99 97 2 20 103 98 4 41
नजगजलड Nagaland 134 131 3 22 156 138 18 117
बिपिज Tripura 269 269 0 00 298 293 5 17
उततर-परवी कषतर North-Eastern Region 2790 2700 90 32 2967 2850 117 39
समपणण भारत All India 172945 170604 2341 14 177022 175528 1494 08
24
अधिकतम वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Peak Power Supply Position Report (Provisional)
आकड़ मगज वजट नट Figures in MW netअपरल2018 -अकरबर2018 April2018 to October2018
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
मजग की पनता म कमी Demand not Met
Excludes the supply to Bangladesh
राजयStateअकरबर2018 October2018
मजग की पनता म कमी Demand not Met
File NoCEA-CH-14-1142018-Coordination Division
आकड़ मममलयन यननट नट Figures in MU net
ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied
कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )
चडीगढ़ Chandigarh 141 141 0 00 947 947 0 00
दिलली Delhi 2925 2924 1 00 20034 20021 13 01
हरियजणज Haryana 4794 4794 0 00 30651 30651 0 00
दहमजचल परिश Himachal Pradesh 876 853 24 27 4940 4773 167 34
रमम कशमीि Jammu amp Kashmir 1520 1246 274 180 9485 7646 1839 194
परजब Punjab 5575 5575 0 00 34414 34401 13 00
िजरसथजन Rajasthan 6202 6201 0 00 38594 38434 160 04
उतति परिश Uttar Pradesh 10211 10124 86 08 65349 64836 513 08
उततिजखड Uttarakhand 1162 1149 13 11 7311 7229 82 11
उततरी कषतर Northern Region 33405 33008 398 12 211725 208939 2786 13
छततीसगढ़ Chhattisgarh 2403 2388 15 06 13665 13638 27 02
गरिजत Gujarat 10122 10122 0 00 59146 59132 14 00
मधय परिश Madhya Pradesh 5492 5491 1 00 32552 32551 1 00
महजिजषटर Maharashtra 13615 13612 3 00 80266 80260 6 00
िमन औि दिउ Daman amp Diu 221 221 0 00 1306 1306 0 00
िजिि व नगि हवली Dadra amp Nagar Haveli 551 551 0 00 3204 3204 0 00
गोवज Goa 339 339 0 00 2131 2128 2 01
पशचिमी कषतर Western Region 32742 32723 19 01 192270 192220 50 00
आनधर परिश Andhra Pradesh 5294 5287 7 01 31518 31480 37 01
तलगजनज Telangana 6279 6272 8 01 31503 31463 40 01
कनजाटक Karnataka 5701 5693 8 01 33269 33225 45 01
किल Kerala 2050 2026 24 12 12140 12063 76 06
तममल नजड Tamil Nadu 8971 8959 12 01 57131 57065 66 01
पडचिी Puducherry 226 224 2 08 1438 1431 7 05
लकष-दवीप Lakshadweep 4 4 0 0 23 23 0 0
दकषकषणी कषतर Southern Region 28520 28460 60 02 166998 166727 271 02
बबहजि Bihar 2839 2793 46 16 16400 16213 188 11
िजमोिि घजटी ननगम DVC 1901 1750 151 79 11384 11130 254 22
झजिखणड Jharkhand 740 723 17 22 4321 4252 69 16
ओडडशज Odisha 2921 2918 3 01 17077 17058 19 01
पशशचम बगजल West Bengal 4902 4879 23 05 28804 28681 123 04
मसशककम Sikkim 39 39 0 01 239 239 0 01
अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 67 173 162 12 67
परवी कषतर Eastern Region 13341 13102 240 18 78225 77573 652 08
अरणजचल परिश Arunachal Pradesh 74 73 1 10 435 429 6 14
असम Assam 950 914 36 38 5320 5094 226 43
मणणपि Manipur 70 69 1 11 414 408 6 15
मघजलय Meghalaya 150 150 0 01 896 896 0 01
ममज़ोिम Mizoram 58 57 1 12 302 297 5 16
नजगजलड Nagaland 80 72 8 104 464 414 50 108
बिपिज Tripura 192 191 1 07 895 878 17 19
उततर-परवी कषतर North-Eastern Region 1575 1527 48 31 8726 8415 311 36
समपणण भारत All India 109584 108819 765 07 657944 653873 4071 06
Energy not Supplied Energy not Supplied
ससतबर2018 September2018 अपरल2018 -ससतबर2018 April2018 to September2018
ऊरजा पनत ा म कमी ऊरजा पनत ा म कमी
Excludes energy exported to Bangladesh
राजयState
ऊराण वरवदयत आपरतण शथिरत ररपोरण (सशोधित) Energy Power Supply Position Report (Revised)
25
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
File NoCEA-CH-14-1142018-Coordination Division
अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met
कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )
चडीगढ़ Chandigarh 293 293 0 00 369 369 0 00
दिलली Delhi 5358 5358 0 00 7016 7016 0 00
हरियजणज Haryana 9008 9008 0 00 10270 10270 0 00
दहमजचल परिश Himachal Pradesh 1466 1466 0 00 1479 1479 0 00
रमम कशमीि Jammu amp Kashmir 2951 2361 590 200 2951 2361 590 200
परजब Punjab 11405 11405 0 00 12638 12638 0 00
िजरसथजन Rajasthan 10612 10612 0 00 11698 11698 0 00
उतति परिश Uttar Pradesh 18346 18121 225 12 20498 20062 436 21
उततिजखड Uttarakhand 1996 1996 0 00 2143 2143 0 00
उततरी कषतर Northern Region 56407 55649 758 13 63166 61726 1440 23
छततीसगढ़ Chhattisgarh 4404 4075 328 75 4404 4136 268 61
गरिजत Gujarat 16963 16963 0 00 17053 16963 90 05
मधय परिश Madhya Pradesh 8811 8771 41 05 8811 8775 36 04
महजिजषटर Maharashtra 22455 22349 106 05 23395 23254 141 06
िमन औि दिउ Daman amp Diu 357 356 1 02 357 356 1 02
िजिि व नगि हवली Dadra amp Nagar Haveli 816 815 1 01 816 815 1 01
गोवज Goa 596 596 0 00 596 596 0 00
पशचिमी कषतर Western Region 52933 52895 38 01 53841 52895 945 18
आनधर परिश Andhra Pradesh 9435 9416 19 02 9435 9416 19 02
तलगजनज Telangana 10815 10815 0 00 10815 10815 0 00
कनजाटक Karnataka 10103 10090 13 01 10690 10688 2 00
किल Kerala 3888 3638 251 64 4050 3997 53 13
तममल नजड Tamil Nadu 14556 14553 3 00 15029 14981 47 03
पडचिी Puducherry 390 372 17 45 420 400 19 46
लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0
दकषकषणी कषतर Southern Region 45542 45428 114 02 45946 45684 262 06
बबहजि Bihar 5050 5045 5 01 5050 5045 5 01
िजमोिि घजटी ननगम DVC 2641 2641 0 00 2874 2874 0 00
झजिखणड Jharkhand 1233 1233 0 00 1339 1284 55 41
ओडडशज Odisha 4906 4906 0 00 5357 5357 0 00
पशशचम बगजल West Bengal 8644 8639 5 01 9130 9123 7 01
मसशककम Sikkim 78 78 0 00 90 90 0 00
अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7
परवी कषतर Eastern Region 22110 22100 10 00 22470 22290 180 08
अरणजचल परिश Arunachal Pradesh 132 130 2 15 138 133 5 37
असम Assam 1865 1809 56 30 1865 1809 56 30
मणणपि Manipur 184 182 2 13 193 186 7 36
मघजलय Meghalaya 317 317 0 00 371 368 2 07
ममज़ोिम Mizoram 95 93 2 23 103 98 4 41
नजगजलड Nagaland 142 138 5 32 156 138 18 117
बिपिज Tripura 296 293 3 10 298 293 5 17
उततर-परवी कषतर North-Eastern Region 2921 2850 71 24 2967 2850 117 39
समपणण भारत All India 177022 175528 1494 08 177022 175528 1494 08
26
मजग की पनता म कमी मजग की पनता म कमी Demand not MetDemand not Met
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
Excludes the supply to Bangladesh
अधिकतम वरवदयत आपरतण शथिरत ररपोरण (सशोधित) Peak Power Supply Position Report (Revised)
आकड़ मगज वजट नट Figures in MW net
राजयStateससतबर2018 September2018 अपरल2018 -ससतबर2018 April2018 to September2018
File NoCEA-CH-14-1142018-Coordination Division
अकरबर2018 October2018अपरल2018 -अकरबर2018 April2018 to October2018
उततरी कषतर Northern Region
चडीगढ़ Chandigarh Data not received Data not received
दिलली Delhi
हरियजणज Haryana
दहमजचल परिश Himachal Pradesh
रमम कशमीि Jammu amp Kashmir Data not received Data not received
परजब Punjab
िजरसथजन Rajasthanउतति परिश Uttar Pradesh
उततिजखड Uttarakhand
पशचिमी कषतर Western Region
छततीसगढ़ Chhattisgarh
गरिजत Gujarat
मधय परिश Madhya Pradesh
महजिजषटर Maharashtra
गोवज Goa
दकषकषणी कषतर Southern Region
आनधर परिश Andhra Pradesh
तलगजनज Telangana
कनजाटक Karnataka
किल Kerala
तममल नजड Tamil Nadu
पडचिी Puducherryपरवी कषतर Eastern Region
बबहजि Bihar
झजिखणड Jharkhand
ओडडशज Odisha
पशशचम बगजल West Bengal
N
o No
tified
Cuts
N
o No
tified
Cuts
27
अकरबर 2018 म इडथरीर पर वरवदयत करौती का वरवरवरण Notified Power CutsRestrictions on Industries during October2018
राजय कषतर State Regionऊराणमाग करौती EnergyDemand Cut
No Notified Cuts No Notified Cuts
File NoCEA-CH-14-1142018-Coordination Division
अकरबर2018 October2018अपरल2018 -अकरबर2018 April2018 to October2018
उततरी कषतर Northern Region
चडीगढ़ Chandigarh Data not received Data not received
दिलली Delhi Data not received Data not received
हरियजणज Haryana 940 hrsday 0709 - 0950 hrsday
दहमजचल परिश Himachal Pradesh No cut imposed on agriculture consumers and uninterrupted
power is being supplied to agriculture sector
HPSEBL has only 2 agriculture consumers and uninterrupted
power is being supplied to agriculture sector
रमम कशमीि Jammu amp Kashmir Data not received Data not received
परजब Punjab 0507 hrsday 0349 - 0844 hrsday
िजरसथजन Rajasthan 0630 hrsday 0630 hrsday
उतति परिश Uttar Pradesh 1825 hrsday 1814 - 1858 hrsday
उततिजखड Uttarakhand 2350 hrsday 2128 - 2357 hrsday
पशचिमी कषतर Western Region
छततीसगढ़ Chhattisgarh 18hoursday 18 hrsday
गरिजत Gujarat 805 hrsday 805 hrsday
मधय परिश Madhya Pradesh Three-Phase Supply(Irrigation)-947 hrs day
Three-Phase (Mixed) Supply - 2311 hrs day
Three-Phase Supply(Irrigation)- 0933 - 0947 hrs day Three-
Phase (Mixed) Supply - 2300 - 2320 hrs day
महजिजषटर Maharashtra Three-Phase Supply(Irrigation)- 9 hrs day
Three-Phase (Mixed) Supply - 24 hrs day
Three-Phase Supply(Irrigation)- 9 hrs day
Three-Phase (Mixed) Supply - 24 hrs day
गोवज Goa No restriction No restriction
दकषकषणी कषतर Southern Region
आनधर परिश Andhra Pradesh 07 hrsday 07 hrsday
तलगजनज Telangana 24 hoursday 24 hoursday
कनजाटक Karnataka 6 hrsday 6 hrsday
किल Kerala No Restrictions No Restrictions
तममल नजड Tamil Nadu 9 hrsday (6 hrs during day time and 3 hrs during night time) 9 hrsday (6 hrs during day time and 3 hrs during night time)
पडचिी Puducherry No Restrictions No Restrictions
परवी कषतर Eastern Region
बबहजि Bihar About 18 hrsday About 18 hrsday
झजिखणड Jharkhand About 20 hrsday About 20 hrsday
ओडडशज Odisha 24 hrsday 24 hrsday
पशशचम बगजल West Bengal About 23 hrsday About 23 hrsday
28
अकटबर 2018 कषि कषतर को षिदयत आपरति का षििरण Power Supply to Agricultural Sector during October2018
राजय कषतर State Regionऔसत वरवदयत आपरतण घनरो म Average Hours of Supply
On segregated feeders
File NoCEA-CH-14-1142018-Coordination Division
SNo Contents Page
1 Growth of Installed Capacity since 6th Plan 29
2 Progress of Transmission Sector since 6th Plan 30
3 All India Yearly Coal consumption for Power Generation (Utilities)
4 All India Annual Per Capita Consumption of Electricity since -2006
5 Average cost of power supply amp Average realisation (Paisakwh)
6 Growth of Rural Electrification amp Pump Sets Energisation
7 Status of Hydro Schemes Cleared by the CEA in Oct-2018
Section G - Growth of Power Sector
31
32
File NoCEA-CH-14-1142018-Coordination Division
(In MW)
Coal Gas Diesel Total
End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472
End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634
End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537
End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596
End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921
End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703
End of 12th Plan 19216288 2532938 83763 21832988 6780 4447842 50018 31960630
Up to Oct-2018 19599250 2493722 837629 22176734 6780 4548742 7201281 34604757
Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-17) = 51529 MW
Electricity Generation (MU) Targets and Achievements for 2016-17
Coal Gas Diesel Nuclear Hydro Res Total
1959925 2493722 837629 678000 454874 72012805 22925174
29
1 Growth of Installed Capacity Since 6th Plan
Plan YearThermal
Nuclear Hydro RES (MNRE) Total
Total Installed Capacity 34604757 MW
Coal Gas Diesel Nuclear Hydro Res
File NoCEA-CH-14-1142018-Coordination Division
Progress of Transmission Sector in the Country up to Oct 2018
1 TRANSMISSION LINES (All fig in CKM)
At the end of
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
6th plan 0 0 0 0 0 0 0 0 0 0 0 0 1831 4198 0 6029 1641 44364 0 46005 3472 48562 0 52034
7th plan 0 0 0 0 0 0 0 0 0 0 0 0 13068 6756 0 19824 4560 55071 0 59631 17628 61827 0 79455
8th plan 0 0 0 0 1634 0 0 1634 0 0 0 0 23001 13141 0 36142 6564 73036 0 79600 31199 86177 0 117376
9th plan 0 0 0 0 3234 1504 0 4738 751 409 0 1160 29345 20033 0 49378 8687 88306 0 96993 42017 110252 0 152269
10th plan 0 0 0 0 4368 1504 0 5872 1775 409 0 2184 48708 24730 0 73438 9444 105185 0 114629 64295 131828 0 196123
11th Plan 0 0 0 0 5948 1504 1980 9432 4839 411 0 5250 71023 30191 5605 106819 10140 125010 830 135980 91950 157116 8415 257481
12th Plan 6124 0 0 6124 5948 1504 1980 9432 25465 1177 4598 31240 92482 48240 17065 157787 11014 151276 978 163268 141033 202197 24621 367851
13th Plan (Up
to Mar2018)6124 0 0 6124 5948 1504 1980 9432 28666 1512 4881 35059 98247 54286 19067 171600 11258 156497 1000 168755 150243 213799 26928 390970
13th Plan (Up
to Sep-18)6124 0 0 6124 5948 1504 1980 9432 30952 1512 5059 37523 99683 56069 20662 176414 11318 160958 1000 173276 154025 220043 28701 402769
27150
75050
47900
118050
90650
30
IR addition in 12th Plan (up to
March 2017)
Total IR (up to Oct-18)
IR at the end of 11th Plan
IR at the end of 12th Plan
Envisaged IR Capacity at the end
of 13th Plan
Grand Total
Note - The figure upto the end of 10th plan in for stringing progress including the lines not commissioned Now only commissioned lines are reckoned Accordingly the figure for 10th plan (end) may read as 187555 after adjusting with (-) 10852 Ckm
Inter-regional Power Transfer Capacity
plusmn 800 kV HVDC plusmn 500 kV HVDC 765 kV 400 kV 220 kV
File NoCEA-CH-14-1142018-Coordination Division
2004-05 27800
2005-06 28100
2006-07 30200
2007-08 33000
2008-09 35500
2009-10 36700
2010-11 38700
2011-12 41756
2012-13 45460
2013-14 48940
2014-15 53040
2015-16 54590
2016-17 57430
2017-18 60800
Year
2005-06
2006-07
2007-08
2008-09
2009-10
2010-11
2011-12
2012-13
2013-14
2014-15
2015-16
2016-17
2017-18
2004-05 254 209 7568
2005-06 260 221 7636
2006-07 276 227 7423
2007-08 293 239 7727
2008-09 340 263 8713
2009-10 355 268 8870
2010-11 398 303 11975
2011-12 455 330 13514
2012-13 501 376 14867
2013-14 518 175
2014-15 520
6719
7171
3 All India yearly Coal Consumption for Power Generation (Utilities)
YEARCoal Consumption
Million Tonnes
4 All India Annual per Capita consumption of Electricity Since 2006
Per Capita Consumption ( kWh)
6314
(GrossGen+ Net Import) Mid-year population
5 Average cost of power supply amp average realization ( paiseKWH )
Yearcost of supply
(paiseunit)
Realization(paiseunit)
Including AgricultureOnly
Agriculture
1149
7335
7786
91441
8188
88363
957
1010
1075
1122
File NoCEA-CH-14-1142018-Coordination Division
Source- PFC Reports on the performance of State Power Utilities 31
File NoCEA-CH-14-1142018-Coordination Division
Sl
NoExecuting Agency
Installed
Capacity (MW)Cost (Rs crore)
Date of
Clearance
32
No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification
since 2004-05
65291374575 296361511th Plan
Cumu upto End of 11th Plan
596556 21212860
557439Cummulative up to end of 12th Plan
46708
18423975
499150
2003-042004-05
5743
9769
Cumu upto End of 10th Plan
010407 to 310308
010410 to 310311557976840909
010411 to 310312
412667
86293726
3207
482864
12632
1576036
4451722594
15455554
2314176
397343611750
2093311060316074
65109527813884
6 Growth Of Rural Electrification amp Pumpsets Energisation
Plan Year
9th Plan2002-03
134092626
4111
Pump Sets Energised Villages Electricfied (Nos)
2001-02
284064367244
1218
27801997-981998-991999-002000-01
297594
010408 to 310309010409 to 310310
10th Plan
2005-062006-07
322968331020
Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as
Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received
from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made
available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified
villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is
independent of the earlier published reports
No Hydro Electric Project has been issued concurrenceAppraisal letter by CEA during October 2018
7 Status of Hydro Schemes Cleared by the CEA in Oct-2018
Name of Scheme
File NoCEA-CH-14-1142018-Coordination Division
SN Contents Page
1 Rate of sale of power for the year 2016-17 33-41
RATE OF SALE OF POWER FOR THE YEAR 2016-17
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) NORTHERN REGION
CENTRAL SECTOR
BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 18000 66900 19800
CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 54000 222400 21600
CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 30000 144400 19600
CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 23100 91700 42600
PARBATI - III HPS NHPC LTD HYDRO-HYDRO 52000 68200 54800
DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 28000 95600 30000
CHUTAK NHPC LTD HYDRO-HYDRO 4400 22000 79800
DULHASTI HPS NHPC LTD HYDRO-HYDRO 39000 228000 56400
SALAL HPS NHPC LTD HYDRO-HYDRO 69000 342300 11000
TANAKPUR HPS NHPC LTD HYDRO-HYDRO 9420 43000 29600
URI HPS -I NHPC LTD HYDRO-HYDRO 48000 280300 16000
URI HPS - II NHPC LTD HYDRO-HYDRO 24000 147300 48600
NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 4500 24600 88200
SEWA - II NHPC LTD HYDRO-HYDRO 12000 47100 43400
ANTA CCPP NTPC LTD THERMAL-GASN 41930 67539 32400
AURAIYA CCPP NTPC LTD THERMAL-GASN 66336 53501 39100
BADARPUR TPS NTPC LTD THERMAL-COAL 70500 159153 44800
DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 84000 296170 42300
DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 98000 526686 46300
DADRI CCPP NTPC LTD THERMAL-GASHSD 82978 227469 33000
FARIDABAD CCPP NTPC LTD THERMAL-GASN 43159 115577 30800
RIHAND STPS I NTPC LTD THERMAL-COAL 100000 596766 24500
RIHAND STPS II NTPC LTD THERMAL-COAL 100000 737069 24600
RIHAND STPS III NTPC LTD THERMAL-COAL 100000 706546 30600
SINGRAULI STPS NTPC LTD THERMAL-COAL 200000 1394068 20400
TANDA TPS NTPC LTD THERMAL-COAL 44000 295438 40800
UNCHAHAR TPS I NTPC LTD THERMAL-COAL 42000 256454 39800
UNCHAHAR TPS II NTPC LTD THERMAL-COAL 42000 273577 38900
UNCHAHAR TPS III NTPC LTD THERMAL-COAL 21000 142780 43000
KOLDAM NTPC LTD HYDRO-HYDRO 80000 363260 43600
NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 303575 25841
RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 108000 668677 35374
NJHPS SJVNL HYDRO-HYDRO 150000 699496 23820
RAMPUR HPS SJVNL HYDRO-HYDRO 41202 195982 32260
TEHRI HPP THDC HYDRO-HYDRO 100000 272543 51800
KOTESHWAR HEP THDC HYDRO-HYDRO 40000 106244 53400
IGSTPS JHAJJAR ARAVALI P CPL THERMAL-COAL 150000 510429 49490
NEYVELI BARSINGSAR NEYVELI LIG CORP LTD THERMAL-LIG 25000 127520 38040
STATE SECTOR
PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 21000 14222 48200
PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 21000 19205 48400
PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 25000 102257 42600
PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 25000 62107 41800
DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 60000 312213 41000
RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 120000 35767442200
WYC HYDEL STATION HPGCL HYDRO-HYDRO 6240 20365 24900
GIRI POWER HOUSE HPSEB HYDRO-HYDRO 6000 13958 7600
ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 1695 5467 11900
BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 12000 18528 6700
GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 2250 7462 22500
BASSI POWER HOUSE HPSEB HYDRO-HYDRO 6600 29649 7500
BINWA POWER HOUSE HPSEB HYDRO-HYDRO 600 2749 19300
ANNEXURE-I
RATE OF SALE OF POWER FOR THE YEAR 2016-2017
Page 33
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) GAJ POWER HOUSE HPSEB HYDRO-HYDRO 1050 2914 26700
BANER POWER HOUSE HPSEB HYDRO-HYDRO 1200 2864 16200
HOLI POWER HOUSE HPSEB HYDRO-HYDRO 300 616 22500
THIROT POWER HOUSE HPSEB HYDRO-HYDRO 450 1126 22500
KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 1200 3064 22500
LARJI POWER HOUSE HPSEB HYDRO-HYDRO 12600 53677 23700
NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 250 750 31000
CHABA POWER HOUSE HPSEB HYDRO-HYDRO 175 465 23300
RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 150 101 13400
SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 200 000 22500
KILLAR HPSEB HYDRO-HYDRO 030 050 22500
BHABA AUGUMENP H HPSEB HYDRO-HYDRO 450 1276 22500
BS CHAMBA HPSEB HYDRO-HYDRO 045 099 19500
GUMMA HPSEB HYDRO-HYDRO 300 423 22500
GAS TURBINE POWER STATION IPGCL THERMAL-GAS 27000 67233 39300
PPS-I PPCL THERMAL-GAS 33000 175905 38300
PPS-III PPCL THERMAL-GAS 137120 196879 36100
LOWER JHELUM JampKPDD HYDRO-HYDRO 10500 60214 5100
UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 2260 10514 6300
UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 10500 44202 8500
GANDHARBAL JampKPDD HYDRO-HYDRO 1500 8925 4700
KARNAH MPH JampKPDD HYDRO-HYDRO 200 1122 31000
CHENANI I JampKPDD HYDRO-HYDRO 2330 10892 6600
CHENANI II JampKPDD HYDRO-HYDRO 200 1188 9300
CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 750 3634 14200
IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 375 2108 18500
IGO MERCHELLONG JampKPDD HYDRO-HYDRO 300 1572 29700
PAHALGAM MHP JampKPDD HYDRO-HYDRO 450 1713 32900
MARPACHOO JampKPDD HYDRO-HYDRO 075 375 29800
HAFTAL JampKPDD HYDRO-HYDRO 100 483 28700
SANJAK JampKPDD HYDRO-HYDRO 126 441 36000
SEWA-III JampKPDD HYDRO-HYDRO 900 3273 20200
BHADERWAH JampKPDD HYDRO-HYDRO 150 935 8900
BAZGO JampKPDD HYDRO-HYDRO 030 108 33300
SUMOOR JampKPDD HYDRO-HYDRO 010 045 35400
HUNDER JampKPDD HYDRO-HYDRO 040 176 26200
STAKNA JampKPDD HYDRO-HYDRO 400 1933 4100
KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 124000 662879 31360
SURATGARH TPS RRVUNL THERMAL-COAL 150000 402328 41730
CHHABRA TPS 1amp 2 RRVUNL THERMAL-COAL 50000 305946 36700
CHHABRA TPS 3 RRVUNL THERMAL-COAL 25000 151536 36700
CHHABRA TPS 4 RRVUNL THERMAL-COAL 25000 155896 36700
RAMGARH GT POWER PROJECT RRVUNL THERMAL-COAL 22050 43177 41800
RAMGARH GAS T P PROJECT 3 RRVUNL THERMAL-GAS 5000 93615 41800
DHOLPUR C C POWER PROJECT RRVUNL THERMAL-R-LNG 33000 9486 46110
MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 14000 20855 34192
MINI MICRO HYDEL (MMH) P S RRVUNL HYDRO-HYDRO 2385 851 37800
KALISINDH TPP 1 RRVUNL THERMAL-COAL 60000 341543 45000
KALISINDH TPP 2 RRVUNL THERMAL-COAL 60000 211588 45000
KHARA HEP UPJVNL HYDRO-HYDRO 7200 26654 7200
MATATILLA HEP UPJVNL HYDRO-HYDRO 3060 12219 6500
OBRA HEP UPJVNL HYDRO-HYDRO 9900 21517 6300
RIHAND UPJVNL HYDRO-HYDRO 30000 57369 5500
ANPARA A TPS UPRVUNL THERMAL-COAL 63000 317536 27000
ANPARA B TPS UPRVUNL THERMAL-COAL 100000 705605 22700
ANPARA D UPRVUNL THERMAL-COAL 100000 300158 39800
HARDUAGANJ TPS UPRVUNL THERMAL-COAL 16500 45817 49200
HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 50000 304389 46600
OBRA A TPS UPRVUNL THERMAL-COAL 28800 13158 34000
OBRA B TPS UPRVUNL THERMAL-COAL 100000 328124 21900
Page 34
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) PANKI TPS UPRVUNL THERMAL-COAL 21000 66488 50300
PARICHHA TPS UPRVUNL THERMAL-COAL 22000 38762 49400
PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 42000 231931 45600
PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 50000 276722 50400
CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 24000 70845 8290
CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 14400 75366 8390
DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 3375 9595 12080
DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 5100 18701 10520
KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4140 17359 12330
KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 12000 33001 9420
KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 3000 11953 8320
TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 9000 33983 12460
MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 30400 124510 16110
RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 19800 17897 10550
MPUR UTTARAKHAND JVNL HYDRO-HYDRO 930 5121 19200
PATHRI UTTARAKHAND JVNL HYDRO-HYDRO 2040 11636 14200
GALOGI UTTARAKHAND JVNL HYDRO-HYDRO 300 648 12500
PRIVATE SECTOR
MGTPP CLP INDIA PVT LTD THERMAL-COAL 132000 268902 41940
SHRINAGAR HEP ALAKNANDA HPCL HYDRO-HYDRO 33000 127414 48800
GAMA INFRAPROP CCPP GAMA INFRAPROP PVT THERMAL-GAS 22500 52686 47000
PPGCL (BARA) JP POWER VENTURES LTD THERMAL-COAL 198000 448200 38500
MALANA HEP MALANA PCL HYDRO-HYDRO 8600 26354 29792
MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 10000 30369 32580
ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 19200 56347 36079
KASHANG HEP H P PCL HYDRO-HYDRO 19500 5034 29200
BASPA-II HEP HBPCL HYDRO-HYDRO 30000 132769 13600
KARCHAM WANGTOO HEP HBPCL HYDRO-HYDRO 100000 434386 36600
RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 108000 582600 43700
RITHALA COMBI CY POWER PLANT TATA POWER DDL THERMAL-GAS 9480 000 11900
RAJPURA TPS NABHA POWER LTD THERMAL-GAS 140000 901484 39000
TALWANDI SABO POWER LTD TALWANDI SABO POWER LTD THERMAL-COAL 198000 636040 49548
ROJA THERMAL POWER STATION ROJA POWER SCL THERMAL-COAL 120000 727200 43400
KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 34400 63400
BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 36000 62600
MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 38200 60800
UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 37900 61500
KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 42300 58800
LALITPUR PGCL BAJAJ ENERGY PVT LTD THERMAL-COAL 198000 359400 47300
PRAYAGRAJ PGCL PRAYAGRAJ PGCL THERMAL-COAL 132000 448200 38595
KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 132000 783182 33438
WESTERN REGION
CENTRAL SECTOR
INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 100000 325333 23892
OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 52000 141663 34001
GANDHAR CCPP NTPC LTD THERMAL-GAS 65739 221924 28700
KAWAS CCPP NTPC LTD THERMAL-GASN 65620 167929 27000
KORBA I amp II NTPC LTD THERMAL-COAL 210000 1499171 20500
KORBA III NTPC LTD THERMAL-COAL 50000 358746 26600
SIPAT STPS I NTPC LTD THERMAL-COAL 198000 1479902 26800
SIPAT STPS II NTPC LTD THERMAL-COAL 100000 766549 26500
VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 126000 693142 25800
VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 100000 608781 23800
VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 100000 673475 27600
VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 100000 655924 32900
VINDHYACHAL STPS V NTPC LTD THERMAL-COAL 50000 328265 31700
MOUDA I NTPC LTD THERMAL-COAL 100000 343130 44500
MOUDA Ii NTPC LTD THERMAL-COAL 66000 40637 39900
RATNAGIRI GAS amp POWER PVT LTD RGPPL THERMAL-GAS 196708 442485 47000
KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 000 24729
TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 32000 201227 10740
Page 35
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 365122 19069
TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 787444 29324
STATE SECTOR
GSEG-HAZIRA15610 MW GUJARAT S ENEGEN LTD THERMAL-GAS 15610 1805 28200
GSEG-HAZIRA35143 MW GUJARAT S ENEGEN LTD THERMAL-GAS 35130 22276 51300
GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 21978 51800
AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 13929 26100
KORBA TPS EAST CSPGCL THERMAL-COAL 44000 198673 33880
DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 365808 27570
KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 316500 30420
HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 532878 19410
CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 515 58300
MTTPS CHAMPA U-I CSPGCL THERMAL-COAL 50000 220376 39000
MTTPS CHAMPA U-II CSPGCL THERMAL-COAL 50000 23709 10000
SHP GANGREL CSPGCL HYDRO-HYDRO 1000 2350 36790
BANGO HEP CSPGCL HYDRO-HYDRO 12000 14662 8900
MHP KORBA WEST CSPGCL HYDRO-HYDRO 170 859 38190
SIKASAR HEP CSPGCL HYDRO-HYDRO 700 418 26870
DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8843 74500
DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 19446 51500
GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 66388 71600
GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127488 41300
KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 96072 43900
KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 29841 56400
SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 184966 58800
UKAI 1-5 GSECL THERMAL-COAL 85000 204891 46900
UKAI TPS 6 GSECL THERMAL-COAL 50000 284448 48200
WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 271999 58300
WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 82808 44100
KADANA HPS GSECL HYDRO-HYDRO 24200 34433 16800
UKAI HPS GSECL HYDRO-HYDRO 30500 40585 6100
TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 123000 11500
BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 8900 10900
BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 7200 27500
JHINNA HPS MPPGCL HYDRO-HYDRO 2000 9700 18500
RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 44300 3400
GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 17300 4600
SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 4100 16900
MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 14600 27000
PENCH HPS MPPGCL HYDRO-HYDRO 16000 23700 8100
RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 3000 16900
AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 134400 35100
SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 283800 38700
SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 344600 34300
SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 111600 61600
SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 211800 58000
SSTPS PH-I MPPGCL THERMAL-COAL 120000 233100 84300
BHUSAWAL TPS MSPGCL THERMAL-COAL 142000 566258 51100
CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1365682 33700
KHAPERKHEDA MSPGCL THERMAL-COAL 134000 706207 39100
KORADI TPS MSPGCL THERMAL-COAL 62000 443206 42000
NASIK TPS MSPGCL THERMAL-COAL 63000 297275 47000
PARLI TPS MSPGCL THERMAL-COAL 113000 175934 71600
PARAS MSPGCL THERMAL-COAL 50000 267931 38700
URAN CCPP MSPGCL THERMAL-GAS 67200 320330 30600
KOYANA MSPGCL HYDRO-HYDRO 195600 328155 13100
SMALL HYDRO POWER PLANTS MSPGCL HYDRO-HYDRO 45400 93062 30500
BHIRA MSPGCL HYDRO-HYDRO 8000 10046 8400
TILLARI MSPGCL HYDRO-HYDRO 8900 10584 3100
SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 233298 20500
SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 87633 20500
PRIVATE SECTOR
Page 36
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 81282 46750
JNSTPP(JAYPEE NIGRIE) JP POWER VENTURES LTD THERMAL-COAL 132000 726695 29310
MB POWER MB POWER THERMAL-COAL 120000 345632 38310
ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 754922 28671
ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 780761 23495
ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 198000 1263784 32090
ADANI POWER MAHARA ADANI POWER LTD THERMAL-COAL 330000 1666191 34124
AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 170065 36827
SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 252035 45129
ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 458551 36000
ESSAR POWER MP LTD ESSAR POWER MP LTD THERMAL-COAL 60000 243040 28600
VEDANTA LTD (P P -I) VEDANTA LTD THERMAL-GAS 3000 15044 24000
VEDANTA LTD (P P -II) VEDANTA LTD THERMAL-GAS 3000 21293 24000
PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 8234600 24000
165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 5850 64390
145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 68717 40349
SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 132655 28776
SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 144686 38567
MUNDRA UMPPCOASTAL GUJARAT POWER
LTD THERMAL-IMP COAL 400000 2530300
23900
LANCO AMARKANTAK TPP PATHADIH
U-ILANCO AMARKAN POWER LTD THERMAL-COAL 30000 195500
29200
LANCO AMARKANTAK TPP PATHADIH
U-IILANCO AMARKAN POWER LTD THERMAL-COAL 30000 206900
27600
BARADARHA TPS D B POWER LTD THERMAL-COAL 120000 677373 29200
JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 405000 28900
JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 453000 40500
DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 339437 40700
TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 293400 44000
TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 137200 37000
TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 174900 44000
BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 92900 14100
BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23700 34300
KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 27600 48300
CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2530300 23900
BHANDARDRA HEP -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 2475 54900
SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 161400 26500
SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 445000 39000
SOTHERN REGION
CENTRAL SECTOR
NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 325699 54820
NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 305532 39880
NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 998805 38510
NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 113016 54070
NEYVELI TAMILNADU POWER LTD JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 625274 42200
VALLUR TPS NTPC TECL THERMAL-COAL 150000 856438 42350
R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 1493 84300
RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1502919 29400
RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 341291 31800
SIMHADRI I NTPC LTD THERMAL-COAL 100000 688382 36800
SIMHADRI II NTPC LTD THERMAL-COAL 100000 663657 43400
KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 593110 31324
MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 291625 21764
KKNPP-1 amp 2 NPCIL NUCLEAR-NUCLEAR 200000 572609 40948
MINICOY LAKSHADEEP THERMAL-DIESEL 340 770 29600
KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1097 29600
AMINI LAKSHADEEP THERMAL-DIESEL 265 509 29600
ANDROTT LAKSHADEEP THERMAL-DIESEL 219 524 29600
KALPENI LAKSHADEEP THERMAL-DIESEL 175 356 29600
AGATTI LAKSHADEEP THERMAL-DIESEL 195 658 29600
KADMAT LAKSHADEEP THERMAL-DIESEL 190 414 29600
KILTAN LAKSHADEEP THERMAL-DIESEL 150 269 29600
CHETLET LAKSHADEEP THERMAL-DIESEL 100 139 29600
BITRA LAKSHADEEP THERMAL-DIESEL 043 024 29600
BANGARAM LAKSHADEEP THERMAL-DIESEL 018 009 29600
Page 37
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) STATE SECTOR
Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 721811 46500
Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 50000 336142 46500
RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 237358 46500
RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 239926 46500
RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 124500 46500
SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 62109 46500
UPPER SILERU APGENCO HYDRO-HYDRO 24000 33000 46500
LOWER SILERU APGENCO HYDRO-HYDRO 46000 81066 46500
DONKARAI APGENCO HYDRO-HYDRO 2500 6007 46500
PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 1262 46500
CHETTIPETA APGENCO HYDRO-HYDRO 100 214 46500
MUCHKUND APGENCO HYDRO-HYDRO 12000 37571 46500
NAGARJUNASAGAR RCPH APGENCO HYDRO-HYDRO 9000 606 46500
TUNGABHADRA HES amp HAMPI(AP
Share)
APGENCO HYDRO-HYDRO 7200 6100 46500
KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 352232 42600
KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 288131 32500
KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 319272 46500
RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 40073 44300
KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 308317 46000
KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 308963 51300
SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 61004 76600
NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 17960 75300
PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 20873 58300
POCHAMPAD-I TSPGENCO HYDRO-HYDRO 2700 5455 29800
POCHAMPAD-II TSPGENCO HYDRO-HYDRO 900 1932 40700
NIZAMSAGAR TSPGENCO HYDRO-HYDRO 1000 1126 53400
RAICHUR TPS 1 to 7 KPCL THERMAL-COAL 147000 890866 43800
RAICHUR TPS 8 KPCL THERMAL-COAL 25000 159523 48200
BELLARI TPS 1 KPCL THERMAL-COAL 50000 318679 51100
BELLARI TPS 2 KPCL THERMAL-COAL 50000 232347 55600
BELLARI TPS 3 KPCL THERMAL-COAL 70000 47565 34400
BHADRA PH KPCL HYDRO-HYDRO 3920 2369 45900
GERUSUPPA PH KPCL HYDRO-HYDRO 24000 26990 22000
GHAT PRABHA HEP KPCL HYDRO-HYDRO 3200 4777 25300
KADRA HPS KPCL HYDRO-HYDRO 15000 16889 26800
NAGJHARI KPCL HYDRO-HYDRO 90000 155159 9800
KODASALLI DPH KPCL HYDRO-HYDRO 12000 14854 19200
MUNIRA+MGH+SPH+SPH KPCL HYDRO-HYDRO 22640 48211 7900
SHARAVATHY HPS KPCL HYDRO-HYDRO 108550 276215 5400
ALMATTI DPH KPCL HYDRO-HYDRO 29000 39611 24600
VARAHI UGPH KPCL HYDRO-HYDRO 46000 71368 15600
IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 17196 15300
IDUKKI HPS KSEB HYDRO-HYDRO 78000 137905 15300
KAKKAD HPS KSEB HYDRO-HYDRO 5000 13063 15300
KALLADA HPS KSEB HYDRO-HYDRO 1500 4436 15300
KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 46544 15300
KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 635 15300
LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 30822 15300
MALANKARA HPS KSEB HYDRO-HYDRO 1050 2474 15300
MATTUPETTY KSEB HYDRO-HYDRO 200 230 15300
MALAMPUZHA KSEB HYDRO-HYDRO 250 063 15300
CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 864 15300
URUMI ST I amp II KSEB HYDRO-HYDRO 615 903 15300
LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 248 15300
NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7765 19625 15300
PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 16601 15300
PANNIAR HPS KSEB HYDRO-HYDRO 3240 6217 15300
PORINGALKUTHU KSEB HYDRO-HYDRO 3600 10052 15300
PORINGALKUTHU LBE KSEB HYDRO-HYDRO 1600 9438 15300
PEPPARA KSEB HYDRO-HYDRO 300 395 15300
POOZHITHODE KSEB HYDRO-HYDRO 480 1045 15300
Page 38
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) PEECHI KSEB HYDRO-HYDRO 125 040 15300
RANI-PERUNADU KSEB HYDRO-HYDRO 400 585 15300
SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 79783 15300
SENGULAM HPS KSEB HYDRO-HYDRO 5120 11558 15300
SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 16711 15300
VILANGAD KSEB HYDRO-HYDRO 750 1578 15300
BARAPOLE KSEB HYDRO-HYDRO 1500 1932 15300
VELLATHOOVAL KSEB HYDRO-HYDRO 360 305 15300
CHIM0NY KSEB HYDRO-HYDRO 250 156 15300
ADYANPARA KSEB HYDRO-HYDRO 350 501 15300
BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 554 15300
KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 3801 15300
KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 23132 32800
ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 14416 62280
METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 523970 62280
METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 321270 62280
NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 336575 62280
NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 591240 62280
TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 508966 62280
KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 30897 62280
VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 18720 90699 62280
KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 33593 62280
BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 1047 62280
PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 1250 62280
PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 330 62280
MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 4897 62280
MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 032 62280
KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15681 62280
KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 40608 62280
KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 21342 62280
KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 4717 62280
KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4322 62280
KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2399 62280
METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 4416 62280
METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 8035 62280
BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2187 62280
BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2359 62280
BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2511 62280
BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 1949 62280
BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 1819 62280
POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 172 62280
SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 241 62280
MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 026 62280
THIRUMOORTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 136 62280
PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 9309 62280
VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 353 62280
SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 4192 62280
PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 6571 62280
SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 1186 62280
SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6319 62280
ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 6122 62280
KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 28674 62280
SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 18381 62280
SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 4258 62280
KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 12680 62280
KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4201 62280
ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 000 62280
PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 19175 62280
AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 078 62280
BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 504 62280
BHAVANI KATTALAI (BKB)(IIIampIII BB I amp II)TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 5847 62280
PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 000 62280
Page 39
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) SRI DAMODARAM STPS APPDCL THERMAL-COAL 160000 808108 36300
PRIVATE SECTOR
KARUPPUR TANJORE LANCO TANJORE PCL THERMAL-GAS 12000 48096 28770
SIMHAPURI ENERGY LTD SIMHAPURI ENERGY LTD THERMAL-COAL 60000 143900 39100
JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 7111 45500
SBU 1 JSW ENERGY LTD
VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 26000 159100
43300
SBU 2 JSW ENERGY LTD
VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 60000 247900
42800
LANCO KPLLANCO KONDAPALLI POWER
LTDTHERMAL-GAS 36814 85060
25776
LANCO KPL STG -IILANCO KONDAPALLI POWER
LTDTHERMAL-GAS 36600 12979
46330
LANCO KPL STG -IIIALANCO KONDAPALLI POWER
LTDTHERMAL-GAS 37100 85710
46330
LANCO KPL STG -III BLANCO KONDAPALLI POWER
LTDTHERMAL-GAS 37100 43639
46330
HINDUJA NATIONAL PCL HINDUJA NATIONAL PCL THERMAL-COAL 104000 303000 38200
MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 121164 49940
UDUPI POWER COR LTD ADANI POWER LTD THERMAL-COAL 120000 754613 42500
SPECTRUM POWER GENERATION
LTD SPECTRUM PG LTD THERMAL-GASN 20525 9256812
34952
TAQA NEYVELI POWER COM PVT
LTD TAQA NEYVELI THERMAL-LIG 25000 5840
34500
ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 251000 51000
ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 207860 36800
GMR VEMAGIRI POWER GENERATION
LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 30117
46450
EASTERN REGION
CENTRAL SECTOR
MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 64675 53113
MTPS STAGE - II KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 39000 1432 69138
BOKARO `B` TPS DVC THERMAL-COAL 63000 145670 31539
MEJIA TPS U 1-3 DVC THERMAL-COAL 63000 348298 31552
MEJIA TPS U 4 DVC THERMAL-COAL 21000 116099 34997
MEJIA TPS U 5-6 DVC THERMAL-COAL 50000 276427 35976
MEJIA TPS U 7-8 DVC THERMAL-COAL 100000 552854 36991
DURGAPUR STEEL TPS DVC THERMAL-COAL 100000 665550 39323
DURGAPUR TPS DVC THERMAL-COAL 21000 59270 35416
RAGHUNATHPUR TPS DVC THERMAL-COAL 120000 201650 35326
MAITHON HYDEL STA DVC HYDRO-HYDRO 6320 12200 17984
CHANDRAPURA TPSU1-3 DVC THERMAL-COAL 42000 257610 35095
CHANDRAPURA TPSU7-8 DVC THERMAL-COAL 50000 306673 34987
KODERMA TPS DVC THERMAL-COAL 100000 380180 38131
PANCHET HPS DVC HYDRO-HYDRO 8000 13360 17984
TILLAYA HPS DVC HYDRO-HYDRO 400 1410 17984
RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34700 35400
TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 277300 23200
TLDP -III NHPC LTD HYDRO-HYDRO 13200 55400 62000
TLDP -IV NHPC LTD HYDRO-HYDRO 16000 60300 25600
FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 957219 33700
FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 308943 41000
BONGAINGAON TPS NTPC LTD THERMAL-COAL 25000 153663 58600
KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 542277 34200
KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 942591 34200
BARH-II NTPC LTD THERMAL-COAL 132000 728021 44500
TALCHER TPS NTPC LTD THERMAL-COAL 46000 335521 30100
TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 702319 25600
TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1436521 24700
STATE SECTOR
BTPS(RampM) BIHAR STATE PGCL THERMAL-COAL 22000 12142 39700
BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 98331 10602
HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 50593 9482
CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 19689 2605
RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 53192 6033
UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 147208 14637
Page 40
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 60353 4519
IB TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 288567 25000
J P H GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 210 038 61100
MEYONG CHU GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 400 1086 61100
TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 122667 38200
DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 214339 43321
KOLAGHAT THERMAL POWER
STATION
WEST BENGAL PDCL THERMAL-COAL 126000 538269 31603
BAKRESHWAR THERMAL POWER
PLANT
WEST BENGAL PDCL THERMAL-COAL 105000 634876 32154
BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 45000 166855 33299
SANTHALDIH THERMAL POWER
STATION
WEST BENGAL PDCL THERMAL-COAL 50000 336442 34932
SAGARDIGHI THERMAL POWER
PROJECT
WEST BENGAL PDCL THERMAL-COAL 160000 423121 34705
JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 20344 68900
RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 24559 68900
TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 4623 68900
PURULIA PUMPED STORAGE
PROJECT
WEST BENGAL SEDCL HYDRO-HYDRO 90000 108816 68900
MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2768 68900
PRIVATE SECTOR
CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 49474 20230
CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 555500 70200
HALDIA ENERGY HALDIA ENERGY LTD THERMAL-COAL 60000 371000 50400
DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3688 63400
KAMALANGA TPS GMR KAMALANGA ENERGY LTD THERMAL-COAL 105000547670
33300
ADHUNIK POWER U-1 ADHUNIK POWER THERMAL-COAL 27000 158 44060
ADHUNIK POWER U-2 ADHUNIK POWER THERMAL-COAL 27000 168 44250
VL-JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 332800 23622
JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 43000 45250
JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 71700 37030
JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 70700 35920
JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 71100 38870
JOJOBERA UNIT 5 TATA POWER COM LTD THERMAL-COAL 12000 79300 44560
JOJOBERA UNIT 6 TATA POWER COM LTD THERMAL-WHR 12000 83700 12840
IEL KALINGANAGAR U-I TATA POWER COM LTD THERMAL-WG 6750 33400 22500
IEL KALINGANAGAR U-II TATA POWER COM LTD THERMAL-WG 6750 34800 22500
MAITHON UNIT 1 amp 2 TATA POWER COM LTD THERMAL-COAL 105000 678000 36100
HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 27500 24340
HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 28400 24340
HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 15800 24310
NORTH EASTERN REGION
CENTRAL SECTOR
LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 74100 36600
AGARTALA GT NEEPCO THERMAL-GAS 13500 88611 27210
ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 153111 32310
DOYANG HEP NEEPCO HYDRO-HYDRO 7500 25598 49801
KOPILI HEP NEEPCO HYDRO-HYDRO 20000 98186 11491
KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 19582 20237
KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 10310 17968
RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 124093 22945
TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 10100 17344 39000
STATE SECTOR
HYDRO POWER (122 Stns) ITANAGAR GOVT OF ARUNACHAL
PRADESHHYDRO-HYDRO 6971 6217270
24600
KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39514 17337
LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 82327 36810
NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 33318 48290
MYNTRIANG SHEP ST II ASSAM POWER GENCO HYDRO-HYDRO 300 567 35776
LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 9130 49200
LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 012 49200
DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 022 49200
TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 000 49200
UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 4990 16000
UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 6476 37000
UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 16494 14600
UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 3600 9556 15000
SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 758 8000
MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44070 44800
KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 154 41400
TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 091 41400
MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 411 41400
MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 394 41400
KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 760 41400
SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 3264 41400
LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 044 41400
BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 18953 28000
ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 43585 28200
GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 4080 11100
Note
LIG Lignite N Naptha WHR Waste Heat Recovery
Page 41
File NoCEA-CH-14-1142018-Coordination Division
Bihar DVC Jharkhand Odisha West Bengal Sikkim AampN Island
Oct-2017 6 0 0 0 8 0 4
Oct-2018 0 0 0 400 0 0 4
Arunachal Assam Manipur Meghalaya Mizoram Nagaland Tripura
Oct-2017 6 77 4 0 2 2 12
Oct-2018 13 81 2 0 2 3 0
9
0 0 0
400
0 0 46 0 0 0 8 0 4
0100200300400500
Bih
ar
DV
C
Jha
rkh
an
d
Od
ish
a
We
st
Be
ng
al
Sik
kim
Aamp
NIs
land
MW
Eastern States (MW) Oct-2018 Oct-2017
13
81
2 0 2 3 06 4 0 2 2
12
0
100
Aru
na
ch
al
Assa
m
Ma
nip
ur
Meghal
aya
Miz
ora
m
Na
gala
nd
Trip
ura
MW
North-Eastern States (MW)
File NoCEA-CH-14-1142018-Coordination Division
Sector Oct-2017 Oct-2018
Central 6872 7355
State 5217 6078
Private 6045 6819
ALL INDIA 5882 6524
Month PLF 2017 PLF 2018
Jan 6014 6288
Feb 6153 6285
March 6313 6558
April 6493 6458
May 6355 6554
June 5672 5917
July 537 5545
Aug 5733 5639
Sep 5989 6109
Oct 5882 6524
For Coal and Lignite based Power Plants and Provisional based on Actual-Cum-Assesment
10
PLF of Thermal Power Plants
All India PLF of Thermal Plants (Excluding Gas Based Plants) Month-wise
10 All India PLF Sector-wise for Oct-2018
68
72
52
17
60
45
58
8273
55
60
78
68
19
65
24
000
1000
2000
3000
4000
5000
6000
7000
8000
Central State Private ALL INDIA
P
LF
Oct-2017 Oct-2018
0
10
20
30
40
50
60
70
Jan Feb March April May June July Aug Sep Oct
Months
All India PLF Month-wise
PLF 2017 PLF 2018
File NoCEA-CH-14-1142018-Coordination Division
2012-13 2013-14 2014-15 2015-16 2016-17
TampD Losses 2304 2284 2277 2181 2142
ATampC Losses 2548 2258 2462
Note As per PFC for utilities selling directly to consumers
Total Number of Villages
597464
Note From the year 2004-05 onwards Definition of Village Electrification-
A village would be declared Electrified if
Without
Subsidy
Gap ACS-
ARR(
Without
Subsidy)
Paiseunit
Gap ACS-
ARR (on
subsidy
booked
basis)
paiseunit
Gap ACS-
ARR (on
subsidyrece
ived basis)
paiseunit
2013-14 400 118 76 77
2014-15 412 108 58 60
Source- PFC Reports on the performance of State Power Utilities
2013-14 4894
2014-15 5304
2015-16 5459
2016-17 5743
2017-18 6080
11
Average cost of supply(ACS)
(paiseunit)
i) Basic Infrastructure such as Distribution Transformer and Distribution lines are provided in the inhabited locality
as well as Dalit Basti hemlet where it exists (For electrification through Non-Conventional Energy Sources a
Distribution Transformer may not be necessary)
14 All India Coal consumption for Power Generation (MT)
520
Average Revenue Realization(paiseunit)
518
Year
ii) Electricity is provided to Public places like Schools Panchayat Office Health Centre Dispensaries Community
Centres etc and
iv) Mandatory Certification from Gram Panchayat regarding the completion of village electrification should be
obtained
13 Average cost of Power amp Average Realisation
iii) The number of households electrified should be at least 10 of the total number of households in the village
11 T amp D and ATampC Losses ()
12 All India Village Electrification
Villiages Electrified (Nos)
10000All villages as per census 2011 has
been electrified on 28042018
Villages electrified
File NoCEA-CH-14-1142018-Coordination Division
SN Contents Page
1 Capacity Addition Targets and Achievements in 12th Plan 12
2 Capacity Addition Targets amp Achievements during Oct-2018 and April 2018- Oct 2018 13
3 Installed Capacity in various Regions including their shares 14-19
Section B - Capacity Addition
File NoCEA-CH-14-1142018-Coordination Division
Figures in MW
TARGET ACH TARGET ACH TARGET ACH TARGET ACH
CENTRAL 14878 15869 6004 2584 5300 2000 26182 20453
STATE 13922 22201 1608 2276 0 0 15530 24477
PRIVATE 43540 53661 3285 619 0 0 46825 54280
ALL INDIA 72340 91730 10897 5479 5300 2000 88537 99209
Figures in MW
Thermal Hydro Nuclear Total
Target Ach Target Ach Target Ach Target Ach
Central 4880 3170 800 390 500 6180 3560 5761
State 3546 1760 300 200 0 3846 1960 5096
Private 2940 3780 205 205 0 3145 3985 12671
Total 11366 8710 1305 795 500 0 13171 9505 7217
12
2 CAPACITY ADDITION TARGET AND ACHIEVEMENT FOR 2017-18 (IN MW)
1 Capacity Addtion Targets and Achievements in the 12th Plan
SECTORTHERMAL HYDRO NUCLEAR TOTAL
File NoCEA-CH-14-1142018-Coordination Division
(MW)
Cummulative
Deviation
Target Achievement Target Achievement (+) (-)
Central 2760 250 0 250 0 -250
State 450615 1030 0 1030 69755 -960245
Private 0 0 600 0 600 600
Total 726615 1280 600 1280 669755 -610245
Central 710 0 0 110 110 0
State 130 0 0 12999 30 -9999
Private 0 0 0 0 0 0
Total 840 0 0 23999 140 -9999
Nuclear Central 0 0 0 0 0 0
Central 3470 250 0 360 110 -250
State 463615 1030 0 115999 99755 -1060235
Private 0 0 600 0 600 600
Total 810615 1280 600 151999 809755 -710235
Electricity Generation (MU) Targets and Achievements for 2016-17
13
2 Capacity Addition Targets Achievements During Oct-2018
Schemes Sector
Target 2018-19
April 2018- Oct 2018Oct-18
Hydro
All India
Capacity Addition TargetsAchievements during the Month of Oct-2018
Thermal
12
80
24
0
0
15
20
67
0
14
0
0
81
0
0
200
400
600
800
1000
1200
1400
1600
Thermal Hydro Nuclear Total
MW
Targets and Achievement during 2018-19Target Achievement
600
0 00 0
600
0
100
200
300
400
500
600
700
800
900
1000
Target Achievement
MW
Targets and Achievement during Oct 2018Thermal Hydro
Nuclear Total
File NoCEA-CH-14-1142018-Coordination Division
Coal Gas Diesel Total
State 1593400 287920 000 1881320 000 869755 68956 2820031
Private 2276083 55800 000 2331883 000 251400 1261535 3844818
Central 1258537 234406 000 1492943 162000 849622 32900 2537465
Sub Total 5128020 578126 000 5706146 162000 1970777 1363391 9202314
State 2128000 284982 000 2412982 000 544650 31119 2988751
Private 3488567 467600 000 3956167 000 48100 2005170 6009437
Central 1504295 328067 000 1832362 184000 162000 66130 2244492
Sub Total 7120862 1080649 000 8201511 184000 754750 2102418 11242679
State 1943250 79198 28788 2051236 000 1183803 52102 3287141
Private 1212450 532210 47370 1792030 000 000 3495815 5287845
Central 1422502 35958 000 1458460 332000 000 49190 1839650
Sub Total 4578202 647366 76158 5301726 332000 1183803 3597107 10414636
State 695000 10000 000 705000 000 353792 22511 1081303
Private 637500 000 000 637500 000 39900 84853 762253
Central 1387664 000 000 1387664 000 100520 1000 1489184
Sub Total 2720164 10000 000 2730164 000 494212 108364 3332740
State 000 49771 3600 53371 000 42200 25674 121245
Private 000 2450 000 2450 000 000 2571 5021
Central 52002 125360 000 177362 000 103000 500 280862
Sub Total 52002 177581 3600 233183 000 145200 28745 407128
State 000 000 4005 4005 000 000 525 4530
Private 000 000 000 000 000 000 221 221
Central 000 000 000 000 000 000 510 510
Sub Total 000 000 4005 4005 000 000 1256 5261
State 6359650 711871 36393 7107913 000 2994200 200887 10303000
Private 7614600 1058060 47370 8720030 000 339400 6850164 15909594
Central 5625000 723791 000 6348791 678000 1215142 150230 8392163
Total 19599250 2493722 83763 22176734 678000 4548742 7201281 34604757
Figures at decimal may not tally due to rounding off
Note -
(As per latest information available with MNRE)
Break up of RES all India as on 30092018 is given below (in MW)
450695 3461510 2402166 7201281
A Oct 2018 669755 MW
B Capacity Retired
during
Oct 2018 705 MW
C Oct 2018 0 MW
D Oct 2018 A-B+C -35245 MW
Share of Telangana from JEGURUPADU CCPP Ph II has been removed and the same has been added to private sector of Andhra Pradesh due to expiry of PPA as per
request from TS Transco
Region
ALL INDIA INSTALLED CAPACITY (IN MW) OF POWER STATIONS (As on 31102018)
(UTILITIES)
Net Capacity Added during
1 RES include SHP BP UampI Solar and Wind Energy Installed capacity in respect of RES (MNRE) as on 30092018
Small
Hydro PowerWind Power
Bio-PowerSolar Power
Total
CapacityBM PowerCogen Waste to Energy
2 U-1 to 7 (76995=69755 MW) of LAKWA REPLACEMENT POWER PROJECT commissioned in April 2018 but intimated in October 2018
has been added to state sector of Assam
1 Badarpur TPS (705 MW) has been retired from central sector of Northern Region
Capacity Up-rated
Ownership Sector
873080 13830
Capacity Added during
1 U-2 (600 MW) of MAHAN TPP has been commissioned and added to private sector of Madhya Pradesh
Grand TotalThermalNuclear Hydro
Islands
ALL INDIA
Abbreviation- SHP=Small Hydro Project (le 25 MW) BP=Biomass Power UampI=Urban amp Industrial Waste Power RES=Renewable Energy Sources
Northern Region
Western Region
Southern Region
Eastern Region
North Eastern
Region
RES
(MNRE)
Modewise breakup
File NoCEA-CH-14-1142018-Coordination Division
Coal Gas Diesel Total
State 13500 180040 000 193540 000 000 000 193540
Private 86922 10800 000 97722 000 000 12157 109879
Central 311272 20701 000 331973 10283 72309 000 414565
Sub-Total 411694 211541 000 623235 10283 72309 12157 717984
State 272000 15000 000 287000 000 110282 5930 403212
Private 408078 000 000 408078 000 20000 34745 462823
Central 129472 53561 000 183034 10094 66370181 500 259998
Sub-Total 809550 68561 000 878112 10094 196652 41175 1126032
State 000 000 000 000 000 69460 25661 95121
Private 000 000 000 000 000 99200 60536 159736
Central 18340 6201 000 24541 2895 122388 000 149824
Sub-Total 18340 6201 000 24541 2895 291048 86197 404681
State 000 17500 000 17500 000 123000 12903 153403
Private 000 000 000 000 000 000 5985 5985
Central 50639 12907 000 63547 6798 109188 000 179533
Sub-Total 50639 30407 000 81047 6798 232188 18888 338921
State 176000 15000 000 191000 000 259770 12780 463550
Private 511550 000 000 511550 000 28800 115462 655812
Central 85458 26401 000 111859 19681 92342 000 223882
Sub-Total 773008 41401 000 814409 19681 380912 128242 1343244
State 585000 60380 000 645380 000 109618 2385 757383
Private 388200 000 000 388200 000 10400 710680 1109280
Central 120625 22110 000 142735 55674 73901 29400 301710
Sub-Total 1093825 82490 000 1176315 55674 193919 742465 2168373
State 546900 000 000 546900 000 72410 2510 621820
Private 871433 000 000 871433 000 84200 266691 1222324
Central 379639 54949 000 434588 28948 180253 3000 646789
Sub-Total 1797972 54949 000 1852921 28948 336863 272201 2490933
State 000 000 000 000 000 125215 6787 132002
Private 9900 45000 000 54900 000 8800 52244 115944
Central 34324 6966 000 41290 3124 47554 000 91968
Sub-Total 44224 51966 000 96190 3124 181569 59031 339914
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 3035 3035
Central 3815 1503 000 5317 801 10171 000 16289
Sub-Total 3815 1503 000 5317 801 10171 3035 19324
124953 29105 000 154058 23703 75145 000 252907
State 1593400 287920 000 1881320 000 869755 68956 2820031
Private 2276083 55800 000 2331883 000 251400 1261535 3844818
Central 1258537 234406 000 1492943 162000 849622 32900 2537465
Grand Total 5128020 578126 000 5706146 162000 1970777 1363391 9202314
Uttar Pradesh
Uttarakhand
Chandigarh
Grand TotalThermalNuclear
Hydro
(Renewable)
RES
(MNRE)
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
NORTHERN REGION
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
(As on 31102018)
Central - Unallocated
Total (Northern
Region)
Delhi
Haryana
Himachal Pradesh
Jammu amp Kashmir
Punjab
Rajasthan
State Ownership Sector
Modewise breakup
File NoCEA-CH-14-1142018-Coordination Division
(As on 31102018)
Coal Gas Diesel Total
State 000 000 000 000 000 000 005 005
Private 000 4800 000 4800 000 000 091 4891
Central 45478 1967 000 47445 2600 000 000 50045
Sub-Total 45478 6767 000 52245 2600 000 096 54941
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 1301 1301
Central 12663 4334 000 16997 700 000 000 17697
Sub-Total 12663 4334 000 16997 700 000 1301 18998
State 475000 217782 000 692782 000 77200 800 770782
Private 776567 396000 000 1172567 000 000 729782 1902349
Central 309051 42400 000 351451 55900 000 23830 431181
Sub-Total 1560618 656182 000 2216800 55900 77200 754412 3104312
State 408000 000 000 408000 000 170366 8396 586762
Private 617400 10000 000 627400 000 000 378205 1005605
Central 279441 25700 000 305141 27300 152000 30000 514441
Sub-Total 1304841 35700 000 1340541 27300 322366 416601 2106808
State 228000 000 000 228000 000 12000 1105 241105
Private 849000 000 000 849000 000 000 52430 901430
Central 195344 000 000 195344 4800 10000 000 210144
Sub-Total 1272344 000 000 1272344 4800 22000 53535 1352679
State 1017000 67200 000 1084200 000 285084 20813 1390097
Private 1245600 56800 000 1302400 000 48100 842815 2193315
Central 433475 227273 000 660748 69000 000 12300 742048
Sub-Total 2696075 351273 000 3047348 69000 333184 875927 4325459
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 546 546
Central 17444 6634 000 24078 900 000 000 24978
Sub-Total 17444 6634 000 24078 900 000 546 25524
211400 19759 000 231159 22800 000 000 253959
State 2128000 284982 000 2412982 000 544650 31119 2988751
Private 3488567 467600 000 3956167 000 48100 2005170 6009437
Central 1504295 328067 000 1832362 184000 162000 66130 2244492
Grand Total 7120862 1080649 000 8201511 184000 754750 2102418 11242679
Central - Unallocated
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
WESTERN REGION
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
State Ownership Sector
Modewise breakup
Grand TotalThermalNuclear
Hydro
(Renewable)
RES
(MNRE)
Total (Western
Region)
Goa
Daman amp Diu
Gujarat
Madhya Pradesh
Chhattisgarh
Maharashtra
Dadra amp Nagar
Naveli
File NoCEA-CH-14-1142018-Coordination Division
(As on 31102018)
Coal Gas Diesel Total
State 501000 23540 000 524540 000 167360 4875 696775
Private 387388 381318 3680 772386 000 000 693073 1465459
Central 167456 000 000 167456 12727 000 25000 205183
Sub-Total 1055844 404858 3680 1464382 12727 167360 722948 2367417
State 508250 000 000 508250 000 247993 4022 760265
Private 83945 83182 000 167127 000 000 375048 542175
Central 195612 000 000 195612 14873 000 1000 211485
Sub-Total 787807 83182 000 870989 14873 247993 380070 1513925
State 502000 000 12792 514792 000 359980 15533 890305
Private 195850 000 2520 198370 000 000 1275640 1474010
Central 282920 000 000 282920 69800 000 000 352720
Sub-Total 980770 000 15312 996082 69800 359980 1291173 2717035
State 000 000 15996 15996 000 188150 15402 219548
Private 61500 17400 000 78900 000 000 20899 99799
Central 114322 35958 000 150280 36200 000 5000 191480
Sub-Total 175822 53358 15996 245176 36200 188150 41301 510827
State 432000 52408 000 484408 000 220320 12270 716998
Private 483767 50310 41170 575247 000 000 1130984 1706231
Central 448952 000 000 448952 144800 000 18190 611942
Sub-Total 1364719 102718 41170 1508607 144800 220320 1161444 3035171
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 000 000
Central 10000 000 000 10000 000 000 000 10000
Sub-Total 10000 000 000 10000 000 000 000 10000
State 000 3250 000 3250 000 000 000 3250
Private 000 000 000 000 000 000 171 171
Central 24840 000 000 24840 8600 000 000 33440
Sub-Total 24840 3250 000 28090 8600 000 171 36861
178400 000 000 178400 45000 000 000 223400
State 1943250 79198 28788 2051236 000 1183803 52102 3287141
Private 1212450 532210 47370 1792030 000 000 3495815 5287845
Central 1422502 35958 000 1458460 332000 000 49190 1839650
Grand Total 4578202 647366 76158 5301726 332000 1183803 3597107 10414636
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
SOUTHERN REGION
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
State Ownership Sector
Modewise breakup
Grand TotalThermal RES
(MNRE)Nuclear
Hydro
(Renewable)
Kerala
Tamil Nadu
NLC
Puducherry
Central - Unallocated
Total (Southern
Region)
Andhra Pradesh
Telangana
Karnataka
File NoCEA-CH-14-1142018-Coordination Division
(As on 31102018)
Coal Gas Diesel Total
State 71000 000 000 71000 000 000 7070 78070
Private 28100 000 000 28100 000 000 25545 53645
Central 291433 000 000 291433 000 11000 000 302432
Sub-Total 390533 000 000 390533 000 11000 32615 434147
State 42000 000 000 42000 000 13000 405 55405
Private 73000 000 000 73000 000 000 3207 76207
Central 39374 000 000 39374 000 6100 000 45474
Sub-Total 154374 000 000 154374 000 19100 3612 177086
State 540000 10000 000 550000 000 98600 9195 657795
Private 242500 000 000 242500 000 000 34452 276952
Central 76077 000 000 76077 000 41000 000 117077
Sub-Total 858577 10000 000 868577 000 139600 43647 1051824
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 000 000
Central 698504 000 000 698504 000 18620 000 717124
Sub-Total 698504 000 000 698504 000 18620 000 717124
State 42000 000 000 42000 000 206192 630 248822
Private 293900 000 000 293900 000 000 21648 315548
Central 163390 000 000 163390 000 8900 1000 173290
Sub-Total 499290 000 000 499290 000 215092 23278 737660
State 000 000 000 000 000 36000 5211 41211
Private 000 000 000 000 000 39900 001 39901
Central 8703 000 000 8703 000 6400 000 15103
Sub-Total 8703 000 000 8703 000 82300 5212 96215
110183 000 000 110183 000 8501 000 118684
State 695000 10000 000 705000 000 353792 22511 1081303
Private 637500 000 000 637500 000 39900 84853 762253
Central 1387664 000 000 1387664 000 100520 1000 1489184
Grand Total 2720164 10000 000 2730164 000 494212 108364 3332740
(As on 31102018)
Coal Gas Diesel Total
State 000 32821 000 32821 000 10000 3001 45822
Private 000 2450 000 2450 000 000 1680 4130
Central 27902 43556 000 71458 000 36851 000 108309
Sub-Total 27902 78827 000 106729 000 46851 4681 158261
State 000 000 000 000 000 000 10710 10710
Private 000 000 000 000 000 000 539 539
Central 2470 4682 000 7152 000 11800 000 18952
Sub-Total 2470 4682 000 7152 000 11800 11249 30201
State 000 000 000 000 000 32200 3103 35303
Private 000 000 000 000 000 000 006 006
Central 3040 10969 000 14009 000 7446 000 21455
Sub-Total 3040 10969 000 14009 000 39646 3109 56764
State 000 16950 000 16950 000 000 1601 18551
Private 000 000 000 000 000 000 009 009
Central 3740 43695 000 47435 000 7077 500 55012
Sub-Total 3740 60645 000 64385 000 7077 2110 73572
State 000 000 3600 3600 000 000 545 4145
Private 000 000 000 000 000 000 217 217
Central 3140 7157 000 10297 000 9677 000 19974
Sub-Total 3140 7157 3600 13897 000 9677 762 24336
State 000 000 000 000 000 000 3067 3067
Private 000 000 000 000 000 000 100 100
Central 2140 4893 000 7033 000 5860 000 12893
Sub-Total 2140 4893 000 7033 000 5860 3167 16060
State 000 000 000 000 000 000 3647 3647
Private 000 000 000 000 000 000 020 020
Central 2070 4046 000 6116 000 9913 000 16029
Sub-Total 2070 4046 000 6116 000 9913 3667 19696
7500 6362 000 13862 000 14376 000 28238
State 000 49771 3600 53371 000 42200 25674 121245
Private 000 2450 000 2450 000 000 2571 5021
Central 52002 125360 000 177362 000 103000 500 280862
Grand Total 52002 177581 3600 233183 000 145200 28745 407128
Central - Unallocated
Total (Eastern
Region)
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
NORTH-EASTERN REGION
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
State Ownership Sector
Modewise breakup
Grand TotalThermalNuclear
Bihar
Jharkhand
West Bengal
DVC
Odisha
Sikkim
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
EASTERN REGION
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
Ownership Sector
Modewise breakup
Grand TotalThermalNuclear
Hydro
(Renewable)
RES
(MNRE)
Manipur
Nagaland
State
Mizoram
Central - Unallocated
Total (North-
Eastern Region)
Hydro
(Renewable)
RES
(MNRE)
Assam
Arunachal Pradesh
Meghalaya
Tripura
File NoCEA-CH-14-1142018-Coordination Division
(As on 31102018)
Coal Gas Diesel Total
State 000 000 4005 4005 000 000 525 4530
Private 000 000 000 000 000 000 146 146
Central 000 000 000 000 000 000 510 510
Sub-Total 000 000 4005 4005 000 000 1181 5186
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 075 075
Central 000 000 000 000 000 000 000 000
Sub-Total 000 000 000 000 000 000 075 075
State 000 000 4005 4005 000 000 525 4530
Private 000 000 000 000 000 000 221 221
Central 000 000 000 000 000 000 510 510
Grand Total 000 000 4005 4005 000 000 1256 5261
19
Andaman amp
Nicobar
lakshadweep
Total (Islands)
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
State Ownership Sector
Modewise breakup
Grand TotalThermalNuclear
Hydro
(Renewable)
RES
(MNRE)
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
ISLANDS
File NoCEA-CH-14-1142018-Coordination Division
SrNo Contents Page
1 Executive summary of Target and Achievement of Transmission Lines during 2018-19
20(1)
2 List of Transmission Lines CommissionedReady for commissioning during Oct-2018 20(2)
Section C - Transmission Lines
File NoCEA-CH-14-1142018-Coordination Division
Executive summary of Target and Achievement of Transmission Lines during 2018-19 As on Oct-18
(All figures in circuit kms)
Centr
al S
ecto
r
Sta
te S
ecto
r
JV
Private
Secto
r
To
tal
Centr
al S
ecto
r
Sta
te S
ecto
r
JV
Private
Secto
r
To
tal
Centr
al S
ecto
r
Sta
te S
ecto
r
JV
Private
Secto
r
To
tal
Centr
al S
ecto
r
Sta
te S
ecto
r
JV
Private
Secto
r
To
tal
Centr
al S
ecto
r
Sta
te S
ecto
r
JV
Private
Secto
r
To
tal
Cen
tral S
ecto
r
Sta
te S
ecto
r
JV
Pri
vate
Secto
r
Gra
nd
To
tal
0 0 0 0 0 0 0 0 4692 766 827 6285 3045 5906 980 9931 553 5878 0 6431 8290 12550 1807 22647
Oct18 Programme 0 0 0 0 0 0 0 0 300 0 0 300 662 90 562 1314 0 723 0 723 962 813 562 2337
Achievement 0 0 0 0 0 0 0 0 729 0 0 729 471 266 0 737 0 401 0 401 1200 667 0 1867
Upto Oct-18 Programme 0 0 0 0 0 0 0 0 3004 416 0 3420 1350 3109 562 5021 481 4346 0 4827 4835 7871 562 13268
Achievement 0 0 0 0 0 0 0 0 2286 0 178 2464 1436 1783 1595 4814 60 4461 0 4521 3782 6244 1773 11799
20(1)
220 kV Grand Total 800 kV 500 kV
Programme 2018-19
Programme
Achievement
HVDC765 kV 400 kV
File NoCEA-CH-14-1142018-Coordination Division
SlNo Line
Length
(cKM)
1 2 3 4 5 6
1 765 Jharsuguda - Dharamjaygarh line DC PGCIL 296
2 765LILO of Kurnool - Thirvualam line at
CuddapahDC PGCIL 190
3 765 Salem PS - Madhugiri PS line SC PGCIL 243
4 400 Cuddapah - Hindupur line (Q) DC PGCIL 338
5 400LILO of Both Ckt of Bamnauli - Samaypur at
TughlakabadMC PGCIL 114
6 400LILO-Out of Cuddapah - Hindupur line (Q)
(Both Ckts) at NP Kunta ssDC PGCIL 19
1200
7 400LILO of Sterlite - Meramundali at Lapanga
4oo kV ssDC OPTCL 14
8 400 Sterlite - Lapanga line DC OPTCL 37
9 400 TMDC Podili - Sattapenalli line DC APTRANSCO 215
10 230Neyveli 230110 kV ss - Eachangadu
230kV FeederSC TANTRANSCO 1
11 230 NNTPS - Neyveli 230110kV ss DC TANTRANSCO 2
12 220 Ajmer (400 kV) - Bherunda (TK) DC RVPNL 100
13 220 Aligarh - Atrauli line DC UPPTCL 77
14 220 Khandwa - Chhanera line DC MPPTCL 78
15 220LILO of one Ckt of Hadala - Sartanpar line
at Wankaner on MC towersDC GETCO 6
16 220 LILO of one Ckt of Vita - Miraj at Alkud ss DC MSETCL 27
17 220 Mendhigiri - Alkud ss DC MSETCL 110
667
1867
20(2)
Grand Total
2Transmission Lines (220 kV and above) CommissionedReady for commissioning During Oct-2018
As on 31-10-18
Voltage
Level (kV)Name of Transmission Lines
Circuit
Type
Executing
Agency
CENTRAL SECTOR
Total of CENTRAL SECTOR
STATE SECTOR Sector
Total of STATE SECTOR
File NoCEA-CH-14-1142018-Coordination Division
SN Contents Page
1 Executive summary of Target and Achievement of Substations during 2018-19 21(1)
2Sub Stations (220 kV and above) commissionedready for commisssioning during Oct-
201821(2)
Section D - Sub Stations
File NoCEA-CH-14-1142018-Coordination Division
1 Executive summary of Target and Achievement of Substations during 2018-19 As on Oct-18
(All figures in circuit MVA)
Centr
al S
ecto
r
Sta
te S
ecto
r
JV
Private
Secto
r
To
tal
Centr
al S
ecto
r
Sta
te S
ecto
r
JV
Private
Secto
r
To
tal
Centr
al S
ecto
r
Sta
te S
ecto
r
JV
Private
Secto
r
To
tal
Centr
al S
ecto
r
Sta
te S
ecto
r
JV
Private
Secto
r
To
tal
Centr
al S
ecto
r
Sta
te S
ecto
r
JV
Private
Secto
r
To
tal
Cen
tral S
ecto
r
Sta
te S
ecto
r
JV
Pri
vate
Secto
r
Gra
nd
To
tal
3000 0 0 3000 0 0 0 0 22200 0 0 22200 8185 13085 630 21900 740 14760 0 15500 34125 27845 630 62600
Oct18 Programme 0 0 0 0 0 0 0 0 0 0 0 0 1000 1260 630 2890 0 1400 0 1400 1000 2660 630 4290
Achievement 0 0 0 0 0 0 0 0 3000 0 0 3000 1500 3120 0 4620 0 2220 0 2220 4500 5340 0 9840
Upto Oct-18 Programme 0 0 0 0 0 0 0 0 10000 0 0 10000 6130 7435 630 14195 0 9670 0 9670 16130 17105 630 33865
Achievement 0 0 0 0 0 0 0 0 14000 0 0 14000 9000 7550 630 17180 0 10610 0 10610 23000 18160 630 41790
21(1)
220 kV Grand Total 800 kV 500 kV
Programme 2018-19
Programme
Achievement
HVDC765 kV 400 kV
File NoCEA-CH-14-1142018-Coordination Division
As on 31-10-18
Sl Voltage Ratio Capacity
No (kVkV) (MWMVA)
1 2 3 4 5
1 Cuddapah Ss 765400 PGCIL 3000
2 Tughlakabad SS (GIS) 400220 PGCIL 1500
Total of CENTRAL SECTOR 4500
3 Panki Kanpur (Aug) TF-I 400200 UPPTCL 75
4 Hindupur ss (1st ICT) 400220 APTRANSCO 315
5 Thappagundu ss 400110 TANTRANSCO 600
6 Mendhasal (2nd power TF) 400220 OPTCL 20
7 Jodhpur ss (New) 400220 RVPNL 315
8 Shankarpally 400220 TSTRANSCO 500
9 Podili ss (1st ICT) 400220 APTRANSCO 315
10 Doni (Gadag)SS 400220 KPTCL 1000
11 Porur (Addl TF) 230110 TANTRANSCO 100
12 Anuppankulam (Addl TF) 230110 TANTRANSCO 60
13 Neyveli SS 230110 TANTRANSCO 480
14 Savarkundla (Aug) 22066 GETCO 60
15 Bhuna (Aug) 220132 HVPNL 100
16 Madanpur (Aug) 22066 HVPNL 100
17 Gurgaon Sec-52A (Aug) 22066 HVPNL 160
18 IA Hisar (Aug) 220132 HVPNL 50
19 Narwana (Aug) 220132 HVPNL 60
20 Therubali (3rd Auto TF) 220132 OPTCL 160
21 Halasar ss 220132 RVPNL 160
22 Bansi Siddaharthnagar (Aug) TF-I 220132 UPPTCL 60
23 Hata Kushinagar (New) TF-I 220132 UPPTCL 100
24 Gomti nagar Lucknow (Aug) TF-IV 22033 UPPTCL 60
25 Kanpur Road Lucknow (New) TF-III 22033 UPPTCL 60
26 Asoj (Aug) 22066 GETCO 150
27 Kangasiyali (Aug) 22066 GETCO 60
28 Karmsad (Aug) 22066 GETCO 160
29 Lalpar (Aug) 22066 GETCO 60
TOTAL STATE SECTOR 5340
GRAND TOTAL 9840
21(2)
PRIVATE SECTOR
CENTRAL SECTOR
STATE SECTOR
2Sub-Stations (220 kV and above) CommissionedReady for commissioning During Oct-2018
Name of Sub StationsExecuting
Agency
File NoCEA-CH-14-1142018-Coordination Division
SN Contents Page
1 Electricity Generation (MU) Targets and Achievements for 2018-19 22
Section E - Electricity Generation
File NoCEA-CH-14-1142018-Coordination Division
Programme Achievement Ach Programme Achievement Ach
Central Sector 35160700 3028100 3162321 10443 20144400 21150469 10499
State Sector 35132000 3010000 3017260 10024 19922100 19549030 9813
PvtIPP Sector 36999700 3240600 3375603 10417 21598300 20794155 9628
PvtUTL Sector 1857600 164500 180597 10979 1130900 1203107 10638
Total 109150000 9443200 9735781 10310 62795700 62696761 9984
Central Sector 5617600 420900 451004 10715 4193000 4045436 9648
State Sector 6110600 559500 708469 12663 4049400 4433000 10947
PvtIPP Sector 1141800 80500 90122 11195 976400 1021963 10467
PvtUTL Sector 130000 11300 12564 11119 76700 99943 13030
Total 13000000 1072200 1262159 11772 9295500 9600342 10328
Central Sector 3850000 353300 303310 8585 2068900 2203540 10651
Total 3850000 353300 303310 8585 2068900 2203540 10651
Bhutan Import 500000 63300 35395 5592 347000 416660 12007
Central Sector 44628300 3802300 3916635 10301 26406300 27399445 10376
State Sector 41242600 3569500 3725729 10438 23971500 23982030 10004
Pvt Sector 40129100 3496900 3658886 10463 23782300 23119168 9721
Total 126500000 10932000 11336645 10370 74507100 74917303 10055
Provisional based on actual-cum-Assesment
Figs in MU
Cummulative
Achievement
Cummulative
Achievement
Sep-18 Sep-17 Upto Sep-2018 Upto Sep-2017
1073794 748889 7332680 5660929
22
Renewable Energy Generation
Achievement
Oct-2018
1 Electricity Generation (MU) Targets and Achievememts for 2018-19
All India Energy Generation During April 2018- Oct 2018 (MU)
Target (2018-19)April 2018- Oct 2018
Sector
Hydro
Thermal
Nuclear
627957
92955
20689
745071
626968
96003
22035
749173
0
100000
200000
300000
400000
500000
600000
700000
800000
Thermal Hydro Nuclear Total
Programme
Achievement
File NoCEA-CH-14-1142018-Coordination Division
SN Contents Page
1 Energy Power Supply Position (Provisional) for Oct-2018 and during April 2018- Oct 2018 23
2 Peak Power Supply Position (Provisional) for Oct-2018 and during April 2018- Oct 2018 24
3 Energy Power Supply Position (Revised) for Sep-2018 and during April 2018- Sept 2018 25
4 Peak Power Supply Position (Revised) for Sep-2018 and during April 2018- Sept 2018 26
5 Notified Power cuts Restrictions on Industries during Oct-2018 27
6 Power Supply to Agricultural Sector during Oct-2018 28
Section F - Power supply position
File NoCEA-CH-14-1142018-Coordination Division
आकड़ मममलयन यननट नट Figures in MU net
ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied
कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )
चडीगढ़ Chandigarh 108 108 0 00 1055 1055 0 00
दिलली Delhi 2490 2489 1 00 22524 22510 14 01
हरियजणज Haryana 4554 4554 0 00 35205 35205 0 00
दहमजचल परिश Himachal Pradesh 788 787 2 02 5728 5560 168 29
रमम कशमीि Jammu amp Kashmir 1497 1219 278 186 10982 8865 2117 193
परजब Punjab 4418 4418 0 00 38832 38819 13 00
िजरसथजन Rajasthan 6748 6748 0 00 45341 45181 160 04
उतति परिश Uttar Pradesh 10136 9973 164 16 75485 74808 676 09
उततिजखड Uttarakhand 1083 1081 3 03 8395 8310 85 10
उततरी कषतर Northern Region 31822 31375 447 14 243547 240314 3233 13
छततीसगढ़ Chhattisgarh 2454 2453 1 00 16119 16091 28 02
गरिजत Gujarat 11636 11636 0 00 70782 70768 14 00
मधय परिश Madhya Pradesh 5860 5859 1 00 38412 38410 2 00
महजिजषटर Maharashtra 15223 15095 128 08 95489 95355 134 01
िमन औि दिउ Daman amp Diu 216 216 0 00 1523 1523 0 00
िजिि व नगि हवली Dadra amp Nagar Haveli 553 553 0 00 3757 3757 0 00
गोवज Goa 366 366 0 00 2497 2495 2 01
पशचिमी कषतर Western Region 36308 36178 130 04 228579 228398 180 01
आनधर परिश Andhra Pradesh 5860 5854 6 01 37377 37334 43 01
तलगजनज Telangana 6748 6742 6 01 38251 38205 46 01
कनजाटक Karnataka 5842 5835 7 01 39111 39059 52 01
किल Kerala 2116 2096 20 09 14256 14160 96 07
तममल नजड Tamil Nadu 8611 8601 10 01 65742 65666 76 01
पडचिी Puducherry 216 215 1 05 1654 1646 8 05
लकष-दवीप Lakshadweep 4 4 0 0 27 27 0 0
दकषकषणी कषतर Southern Region 29392 29342 50 02 196390 196069 321 02
बबहजि Bihar 2742 2738 4 01 19143 18951 192 10
िजमोिि घजटी ननगम DVC 1712 1698 13 08 13096 12828 268 20
झजिखणड Jharkhand 701 697 4 06 5022 4949 73 15
ओडडशज Odisha 3147 3134 13 04 20224 20192 32 02
पशशचम बगजल West Bengal 4204 4200 4 01 33008 32881 127 04
मसशककम Sikkim 40 40 0 00 279 279 0 01
अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 67 202 188 13 67
परवी कषतर Eastern Region 12547 12507 40 03 90772 90080 692 08
अरणजचल परिश Arunachal Pradesh 67 66 1 09 502 496 7 13
असम Assam 833 809 24 29 6153 5903 250 41
मणणपि Manipur 72 71 1 10 485 478 7 14
मघजलय Meghalaya 147 147 0 00 1043 1042 0 00
ममज़ोिम Mizoram 63 62 1 08 365 359 5 14
नजगजलड Nagaland 76 67 8 110 540 481 59 109
बिपिज Tripura 130 129 1 09 1025 1007 19 18
उततर-परवी कषतर North-Eastern Region 1387 1351 35 25 10113 9766 346 34
समपणण भारत All India 111455 110753 702 06 769399 764627 4773 06
23
ऊराण वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Energy Power Supply Position Report (Provisional)
राजयStateअकरबर2018 October2018 अपरल2018 -अकरबर2018 April2018 to October2018
ऊरजा पनत ा म कमी ऊरजा पनत ा म कमीEnergy not Supplied
Excludes energy exported to Bangladesh
Energy not Supplied
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
File NoCEA-CH-14-1142018-Coordination Division
अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met
कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )
चडीगढ़ Chandigarh 217 217 0 00 369 369 0 00
दिलली Delhi 4713 4713 0 00 7016 7016 0 00
हरियजणज Haryana 7948 7948 0 00 10270 10270 0 00
दहमजचल परिश Himachal Pradesh 1520 1520 0 00 1520 1520 0 00
रमम कशमीि Jammu amp Kashmir 2836 2269 567 200 2951 2361 590 200
परजब Punjab 7979 7979 0 00 12638 12638 0 00
िजरसथजन Rajasthan 11450 11450 0 00 11698 11698 0 00
उतति परिश Uttar Pradesh 17434 16745 688 39 20498 20062 436 21
उततिजखड Uttarakhand 1943 1943 0 00 2143 2143 0 00
उततरी कषतर Northern Region 50659 49635 1024 20 63166 61726 1440 23
छततीसगढ़ Chhattisgarh 4414 4268 146 33 4414 4268 146 33
गरिजत Gujarat 18148 18130 19 01 18148 18130 19 01
मधय परिश Madhya Pradesh 11356 11317 39 03 11356 11317 39 03
महजिजषटर Maharashtra 23864 23159 705 30 23864 23254 610 26
िमन औि दिउ Daman amp Diu 342 341 1 02 357 356 1 02
िजिि व नगि हवली Dadra amp Nagar Haveli 784 780 4 05 816 815 1 01
गोवज Goa 536 536 0 00 596 596 0 00
पशचिमी कषतर Western Region 56548 55695 853 15 56548 55695 853 15
आनधर परिश Andhra Pradesh 9435 9435 0 00 9435 9435 0 00
तलगजनज Telangana 10603 10603 0 00 10815 10815 0 00
कनजाटक Karnataka 10741 10741 0 00 10741 10741 0 00
किल Kerala 3727 3644 83 22 4050 3997 53 13
तममल नजड Tamil Nadu 14747 14333 414 28 15029 14981 47 03
पडचिी Puducherry 363 362 1 03 420 400 19 46
लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0
दकषकषणी कषतर Southern Region 45279 45226 53 01 45946 45684 262 06
बबहजि Bihar 4945 4945 0 00 5050 5045 5 01
िजमोिि घजटी ननगम DVC 2729 2729 0 00 2874 2874 0 00
झजिखणड Jharkhand 1260 1260 0 00 1339 1284 55 41
ओडडशज Odisha 5624 5224 400 71 5624 5357 268 48
पशशचम बगजल West Bengal 8775 8775 0 00 9130 9123 7 01
मसशककम Sikkim 86 86 0 00 90 90 0 00
अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7
परवी कषतर Eastern Region 22959 22567 392 17 22959 22567 392 17
अरणजचल परिश Arunachal Pradesh 138 125 13 94 138 133 5 37
असम Assam 1785 1704 81 45 1865 1809 56 30
मणणपि Manipur 187 185 2 11 193 186 7 36
मघजलय Meghalaya 336 336 0 00 371 368 2 07
ममज़ोिम Mizoram 99 97 2 20 103 98 4 41
नजगजलड Nagaland 134 131 3 22 156 138 18 117
बिपिज Tripura 269 269 0 00 298 293 5 17
उततर-परवी कषतर North-Eastern Region 2790 2700 90 32 2967 2850 117 39
समपणण भारत All India 172945 170604 2341 14 177022 175528 1494 08
24
अधिकतम वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Peak Power Supply Position Report (Provisional)
आकड़ मगज वजट नट Figures in MW netअपरल2018 -अकरबर2018 April2018 to October2018
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
मजग की पनता म कमी Demand not Met
Excludes the supply to Bangladesh
राजयStateअकरबर2018 October2018
मजग की पनता म कमी Demand not Met
File NoCEA-CH-14-1142018-Coordination Division
आकड़ मममलयन यननट नट Figures in MU net
ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied
कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )
चडीगढ़ Chandigarh 141 141 0 00 947 947 0 00
दिलली Delhi 2925 2924 1 00 20034 20021 13 01
हरियजणज Haryana 4794 4794 0 00 30651 30651 0 00
दहमजचल परिश Himachal Pradesh 876 853 24 27 4940 4773 167 34
रमम कशमीि Jammu amp Kashmir 1520 1246 274 180 9485 7646 1839 194
परजब Punjab 5575 5575 0 00 34414 34401 13 00
िजरसथजन Rajasthan 6202 6201 0 00 38594 38434 160 04
उतति परिश Uttar Pradesh 10211 10124 86 08 65349 64836 513 08
उततिजखड Uttarakhand 1162 1149 13 11 7311 7229 82 11
उततरी कषतर Northern Region 33405 33008 398 12 211725 208939 2786 13
छततीसगढ़ Chhattisgarh 2403 2388 15 06 13665 13638 27 02
गरिजत Gujarat 10122 10122 0 00 59146 59132 14 00
मधय परिश Madhya Pradesh 5492 5491 1 00 32552 32551 1 00
महजिजषटर Maharashtra 13615 13612 3 00 80266 80260 6 00
िमन औि दिउ Daman amp Diu 221 221 0 00 1306 1306 0 00
िजिि व नगि हवली Dadra amp Nagar Haveli 551 551 0 00 3204 3204 0 00
गोवज Goa 339 339 0 00 2131 2128 2 01
पशचिमी कषतर Western Region 32742 32723 19 01 192270 192220 50 00
आनधर परिश Andhra Pradesh 5294 5287 7 01 31518 31480 37 01
तलगजनज Telangana 6279 6272 8 01 31503 31463 40 01
कनजाटक Karnataka 5701 5693 8 01 33269 33225 45 01
किल Kerala 2050 2026 24 12 12140 12063 76 06
तममल नजड Tamil Nadu 8971 8959 12 01 57131 57065 66 01
पडचिी Puducherry 226 224 2 08 1438 1431 7 05
लकष-दवीप Lakshadweep 4 4 0 0 23 23 0 0
दकषकषणी कषतर Southern Region 28520 28460 60 02 166998 166727 271 02
बबहजि Bihar 2839 2793 46 16 16400 16213 188 11
िजमोिि घजटी ननगम DVC 1901 1750 151 79 11384 11130 254 22
झजिखणड Jharkhand 740 723 17 22 4321 4252 69 16
ओडडशज Odisha 2921 2918 3 01 17077 17058 19 01
पशशचम बगजल West Bengal 4902 4879 23 05 28804 28681 123 04
मसशककम Sikkim 39 39 0 01 239 239 0 01
अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 67 173 162 12 67
परवी कषतर Eastern Region 13341 13102 240 18 78225 77573 652 08
अरणजचल परिश Arunachal Pradesh 74 73 1 10 435 429 6 14
असम Assam 950 914 36 38 5320 5094 226 43
मणणपि Manipur 70 69 1 11 414 408 6 15
मघजलय Meghalaya 150 150 0 01 896 896 0 01
ममज़ोिम Mizoram 58 57 1 12 302 297 5 16
नजगजलड Nagaland 80 72 8 104 464 414 50 108
बिपिज Tripura 192 191 1 07 895 878 17 19
उततर-परवी कषतर North-Eastern Region 1575 1527 48 31 8726 8415 311 36
समपणण भारत All India 109584 108819 765 07 657944 653873 4071 06
Energy not Supplied Energy not Supplied
ससतबर2018 September2018 अपरल2018 -ससतबर2018 April2018 to September2018
ऊरजा पनत ा म कमी ऊरजा पनत ा म कमी
Excludes energy exported to Bangladesh
राजयState
ऊराण वरवदयत आपरतण शथिरत ररपोरण (सशोधित) Energy Power Supply Position Report (Revised)
25
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
File NoCEA-CH-14-1142018-Coordination Division
अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met
कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )
चडीगढ़ Chandigarh 293 293 0 00 369 369 0 00
दिलली Delhi 5358 5358 0 00 7016 7016 0 00
हरियजणज Haryana 9008 9008 0 00 10270 10270 0 00
दहमजचल परिश Himachal Pradesh 1466 1466 0 00 1479 1479 0 00
रमम कशमीि Jammu amp Kashmir 2951 2361 590 200 2951 2361 590 200
परजब Punjab 11405 11405 0 00 12638 12638 0 00
िजरसथजन Rajasthan 10612 10612 0 00 11698 11698 0 00
उतति परिश Uttar Pradesh 18346 18121 225 12 20498 20062 436 21
उततिजखड Uttarakhand 1996 1996 0 00 2143 2143 0 00
उततरी कषतर Northern Region 56407 55649 758 13 63166 61726 1440 23
छततीसगढ़ Chhattisgarh 4404 4075 328 75 4404 4136 268 61
गरिजत Gujarat 16963 16963 0 00 17053 16963 90 05
मधय परिश Madhya Pradesh 8811 8771 41 05 8811 8775 36 04
महजिजषटर Maharashtra 22455 22349 106 05 23395 23254 141 06
िमन औि दिउ Daman amp Diu 357 356 1 02 357 356 1 02
िजिि व नगि हवली Dadra amp Nagar Haveli 816 815 1 01 816 815 1 01
गोवज Goa 596 596 0 00 596 596 0 00
पशचिमी कषतर Western Region 52933 52895 38 01 53841 52895 945 18
आनधर परिश Andhra Pradesh 9435 9416 19 02 9435 9416 19 02
तलगजनज Telangana 10815 10815 0 00 10815 10815 0 00
कनजाटक Karnataka 10103 10090 13 01 10690 10688 2 00
किल Kerala 3888 3638 251 64 4050 3997 53 13
तममल नजड Tamil Nadu 14556 14553 3 00 15029 14981 47 03
पडचिी Puducherry 390 372 17 45 420 400 19 46
लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0
दकषकषणी कषतर Southern Region 45542 45428 114 02 45946 45684 262 06
बबहजि Bihar 5050 5045 5 01 5050 5045 5 01
िजमोिि घजटी ननगम DVC 2641 2641 0 00 2874 2874 0 00
झजिखणड Jharkhand 1233 1233 0 00 1339 1284 55 41
ओडडशज Odisha 4906 4906 0 00 5357 5357 0 00
पशशचम बगजल West Bengal 8644 8639 5 01 9130 9123 7 01
मसशककम Sikkim 78 78 0 00 90 90 0 00
अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7
परवी कषतर Eastern Region 22110 22100 10 00 22470 22290 180 08
अरणजचल परिश Arunachal Pradesh 132 130 2 15 138 133 5 37
असम Assam 1865 1809 56 30 1865 1809 56 30
मणणपि Manipur 184 182 2 13 193 186 7 36
मघजलय Meghalaya 317 317 0 00 371 368 2 07
ममज़ोिम Mizoram 95 93 2 23 103 98 4 41
नजगजलड Nagaland 142 138 5 32 156 138 18 117
बिपिज Tripura 296 293 3 10 298 293 5 17
उततर-परवी कषतर North-Eastern Region 2921 2850 71 24 2967 2850 117 39
समपणण भारत All India 177022 175528 1494 08 177022 175528 1494 08
26
मजग की पनता म कमी मजग की पनता म कमी Demand not MetDemand not Met
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
Excludes the supply to Bangladesh
अधिकतम वरवदयत आपरतण शथिरत ररपोरण (सशोधित) Peak Power Supply Position Report (Revised)
आकड़ मगज वजट नट Figures in MW net
राजयStateससतबर2018 September2018 अपरल2018 -ससतबर2018 April2018 to September2018
File NoCEA-CH-14-1142018-Coordination Division
अकरबर2018 October2018अपरल2018 -अकरबर2018 April2018 to October2018
उततरी कषतर Northern Region
चडीगढ़ Chandigarh Data not received Data not received
दिलली Delhi
हरियजणज Haryana
दहमजचल परिश Himachal Pradesh
रमम कशमीि Jammu amp Kashmir Data not received Data not received
परजब Punjab
िजरसथजन Rajasthanउतति परिश Uttar Pradesh
उततिजखड Uttarakhand
पशचिमी कषतर Western Region
छततीसगढ़ Chhattisgarh
गरिजत Gujarat
मधय परिश Madhya Pradesh
महजिजषटर Maharashtra
गोवज Goa
दकषकषणी कषतर Southern Region
आनधर परिश Andhra Pradesh
तलगजनज Telangana
कनजाटक Karnataka
किल Kerala
तममल नजड Tamil Nadu
पडचिी Puducherryपरवी कषतर Eastern Region
बबहजि Bihar
झजिखणड Jharkhand
ओडडशज Odisha
पशशचम बगजल West Bengal
N
o No
tified
Cuts
N
o No
tified
Cuts
27
अकरबर 2018 म इडथरीर पर वरवदयत करौती का वरवरवरण Notified Power CutsRestrictions on Industries during October2018
राजय कषतर State Regionऊराणमाग करौती EnergyDemand Cut
No Notified Cuts No Notified Cuts
File NoCEA-CH-14-1142018-Coordination Division
अकरबर2018 October2018अपरल2018 -अकरबर2018 April2018 to October2018
उततरी कषतर Northern Region
चडीगढ़ Chandigarh Data not received Data not received
दिलली Delhi Data not received Data not received
हरियजणज Haryana 940 hrsday 0709 - 0950 hrsday
दहमजचल परिश Himachal Pradesh No cut imposed on agriculture consumers and uninterrupted
power is being supplied to agriculture sector
HPSEBL has only 2 agriculture consumers and uninterrupted
power is being supplied to agriculture sector
रमम कशमीि Jammu amp Kashmir Data not received Data not received
परजब Punjab 0507 hrsday 0349 - 0844 hrsday
िजरसथजन Rajasthan 0630 hrsday 0630 hrsday
उतति परिश Uttar Pradesh 1825 hrsday 1814 - 1858 hrsday
उततिजखड Uttarakhand 2350 hrsday 2128 - 2357 hrsday
पशचिमी कषतर Western Region
छततीसगढ़ Chhattisgarh 18hoursday 18 hrsday
गरिजत Gujarat 805 hrsday 805 hrsday
मधय परिश Madhya Pradesh Three-Phase Supply(Irrigation)-947 hrs day
Three-Phase (Mixed) Supply - 2311 hrs day
Three-Phase Supply(Irrigation)- 0933 - 0947 hrs day Three-
Phase (Mixed) Supply - 2300 - 2320 hrs day
महजिजषटर Maharashtra Three-Phase Supply(Irrigation)- 9 hrs day
Three-Phase (Mixed) Supply - 24 hrs day
Three-Phase Supply(Irrigation)- 9 hrs day
Three-Phase (Mixed) Supply - 24 hrs day
गोवज Goa No restriction No restriction
दकषकषणी कषतर Southern Region
आनधर परिश Andhra Pradesh 07 hrsday 07 hrsday
तलगजनज Telangana 24 hoursday 24 hoursday
कनजाटक Karnataka 6 hrsday 6 hrsday
किल Kerala No Restrictions No Restrictions
तममल नजड Tamil Nadu 9 hrsday (6 hrs during day time and 3 hrs during night time) 9 hrsday (6 hrs during day time and 3 hrs during night time)
पडचिी Puducherry No Restrictions No Restrictions
परवी कषतर Eastern Region
बबहजि Bihar About 18 hrsday About 18 hrsday
झजिखणड Jharkhand About 20 hrsday About 20 hrsday
ओडडशज Odisha 24 hrsday 24 hrsday
पशशचम बगजल West Bengal About 23 hrsday About 23 hrsday
28
अकटबर 2018 कषि कषतर को षिदयत आपरति का षििरण Power Supply to Agricultural Sector during October2018
राजय कषतर State Regionऔसत वरवदयत आपरतण घनरो म Average Hours of Supply
On segregated feeders
File NoCEA-CH-14-1142018-Coordination Division
SNo Contents Page
1 Growth of Installed Capacity since 6th Plan 29
2 Progress of Transmission Sector since 6th Plan 30
3 All India Yearly Coal consumption for Power Generation (Utilities)
4 All India Annual Per Capita Consumption of Electricity since -2006
5 Average cost of power supply amp Average realisation (Paisakwh)
6 Growth of Rural Electrification amp Pump Sets Energisation
7 Status of Hydro Schemes Cleared by the CEA in Oct-2018
Section G - Growth of Power Sector
31
32
File NoCEA-CH-14-1142018-Coordination Division
(In MW)
Coal Gas Diesel Total
End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472
End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634
End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537
End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596
End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921
End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703
End of 12th Plan 19216288 2532938 83763 21832988 6780 4447842 50018 31960630
Up to Oct-2018 19599250 2493722 837629 22176734 6780 4548742 7201281 34604757
Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-17) = 51529 MW
Electricity Generation (MU) Targets and Achievements for 2016-17
Coal Gas Diesel Nuclear Hydro Res Total
1959925 2493722 837629 678000 454874 72012805 22925174
29
1 Growth of Installed Capacity Since 6th Plan
Plan YearThermal
Nuclear Hydro RES (MNRE) Total
Total Installed Capacity 34604757 MW
Coal Gas Diesel Nuclear Hydro Res
File NoCEA-CH-14-1142018-Coordination Division
Progress of Transmission Sector in the Country up to Oct 2018
1 TRANSMISSION LINES (All fig in CKM)
At the end of
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
6th plan 0 0 0 0 0 0 0 0 0 0 0 0 1831 4198 0 6029 1641 44364 0 46005 3472 48562 0 52034
7th plan 0 0 0 0 0 0 0 0 0 0 0 0 13068 6756 0 19824 4560 55071 0 59631 17628 61827 0 79455
8th plan 0 0 0 0 1634 0 0 1634 0 0 0 0 23001 13141 0 36142 6564 73036 0 79600 31199 86177 0 117376
9th plan 0 0 0 0 3234 1504 0 4738 751 409 0 1160 29345 20033 0 49378 8687 88306 0 96993 42017 110252 0 152269
10th plan 0 0 0 0 4368 1504 0 5872 1775 409 0 2184 48708 24730 0 73438 9444 105185 0 114629 64295 131828 0 196123
11th Plan 0 0 0 0 5948 1504 1980 9432 4839 411 0 5250 71023 30191 5605 106819 10140 125010 830 135980 91950 157116 8415 257481
12th Plan 6124 0 0 6124 5948 1504 1980 9432 25465 1177 4598 31240 92482 48240 17065 157787 11014 151276 978 163268 141033 202197 24621 367851
13th Plan (Up
to Mar2018)6124 0 0 6124 5948 1504 1980 9432 28666 1512 4881 35059 98247 54286 19067 171600 11258 156497 1000 168755 150243 213799 26928 390970
13th Plan (Up
to Sep-18)6124 0 0 6124 5948 1504 1980 9432 30952 1512 5059 37523 99683 56069 20662 176414 11318 160958 1000 173276 154025 220043 28701 402769
27150
75050
47900
118050
90650
30
IR addition in 12th Plan (up to
March 2017)
Total IR (up to Oct-18)
IR at the end of 11th Plan
IR at the end of 12th Plan
Envisaged IR Capacity at the end
of 13th Plan
Grand Total
Note - The figure upto the end of 10th plan in for stringing progress including the lines not commissioned Now only commissioned lines are reckoned Accordingly the figure for 10th plan (end) may read as 187555 after adjusting with (-) 10852 Ckm
Inter-regional Power Transfer Capacity
plusmn 800 kV HVDC plusmn 500 kV HVDC 765 kV 400 kV 220 kV
File NoCEA-CH-14-1142018-Coordination Division
2004-05 27800
2005-06 28100
2006-07 30200
2007-08 33000
2008-09 35500
2009-10 36700
2010-11 38700
2011-12 41756
2012-13 45460
2013-14 48940
2014-15 53040
2015-16 54590
2016-17 57430
2017-18 60800
Year
2005-06
2006-07
2007-08
2008-09
2009-10
2010-11
2011-12
2012-13
2013-14
2014-15
2015-16
2016-17
2017-18
2004-05 254 209 7568
2005-06 260 221 7636
2006-07 276 227 7423
2007-08 293 239 7727
2008-09 340 263 8713
2009-10 355 268 8870
2010-11 398 303 11975
2011-12 455 330 13514
2012-13 501 376 14867
2013-14 518 175
2014-15 520
6719
7171
3 All India yearly Coal Consumption for Power Generation (Utilities)
YEARCoal Consumption
Million Tonnes
4 All India Annual per Capita consumption of Electricity Since 2006
Per Capita Consumption ( kWh)
6314
(GrossGen+ Net Import) Mid-year population
5 Average cost of power supply amp average realization ( paiseKWH )
Yearcost of supply
(paiseunit)
Realization(paiseunit)
Including AgricultureOnly
Agriculture
1149
7335
7786
91441
8188
88363
957
1010
1075
1122
File NoCEA-CH-14-1142018-Coordination Division
Source- PFC Reports on the performance of State Power Utilities 31
File NoCEA-CH-14-1142018-Coordination Division
Sl
NoExecuting Agency
Installed
Capacity (MW)Cost (Rs crore)
Date of
Clearance
32
No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification
since 2004-05
65291374575 296361511th Plan
Cumu upto End of 11th Plan
596556 21212860
557439Cummulative up to end of 12th Plan
46708
18423975
499150
2003-042004-05
5743
9769
Cumu upto End of 10th Plan
010407 to 310308
010410 to 310311557976840909
010411 to 310312
412667
86293726
3207
482864
12632
1576036
4451722594
15455554
2314176
397343611750
2093311060316074
65109527813884
6 Growth Of Rural Electrification amp Pumpsets Energisation
Plan Year
9th Plan2002-03
134092626
4111
Pump Sets Energised Villages Electricfied (Nos)
2001-02
284064367244
1218
27801997-981998-991999-002000-01
297594
010408 to 310309010409 to 310310
10th Plan
2005-062006-07
322968331020
Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as
Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received
from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made
available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified
villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is
independent of the earlier published reports
No Hydro Electric Project has been issued concurrenceAppraisal letter by CEA during October 2018
7 Status of Hydro Schemes Cleared by the CEA in Oct-2018
Name of Scheme
File NoCEA-CH-14-1142018-Coordination Division
SN Contents Page
1 Rate of sale of power for the year 2016-17 33-41
RATE OF SALE OF POWER FOR THE YEAR 2016-17
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) NORTHERN REGION
CENTRAL SECTOR
BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 18000 66900 19800
CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 54000 222400 21600
CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 30000 144400 19600
CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 23100 91700 42600
PARBATI - III HPS NHPC LTD HYDRO-HYDRO 52000 68200 54800
DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 28000 95600 30000
CHUTAK NHPC LTD HYDRO-HYDRO 4400 22000 79800
DULHASTI HPS NHPC LTD HYDRO-HYDRO 39000 228000 56400
SALAL HPS NHPC LTD HYDRO-HYDRO 69000 342300 11000
TANAKPUR HPS NHPC LTD HYDRO-HYDRO 9420 43000 29600
URI HPS -I NHPC LTD HYDRO-HYDRO 48000 280300 16000
URI HPS - II NHPC LTD HYDRO-HYDRO 24000 147300 48600
NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 4500 24600 88200
SEWA - II NHPC LTD HYDRO-HYDRO 12000 47100 43400
ANTA CCPP NTPC LTD THERMAL-GASN 41930 67539 32400
AURAIYA CCPP NTPC LTD THERMAL-GASN 66336 53501 39100
BADARPUR TPS NTPC LTD THERMAL-COAL 70500 159153 44800
DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 84000 296170 42300
DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 98000 526686 46300
DADRI CCPP NTPC LTD THERMAL-GASHSD 82978 227469 33000
FARIDABAD CCPP NTPC LTD THERMAL-GASN 43159 115577 30800
RIHAND STPS I NTPC LTD THERMAL-COAL 100000 596766 24500
RIHAND STPS II NTPC LTD THERMAL-COAL 100000 737069 24600
RIHAND STPS III NTPC LTD THERMAL-COAL 100000 706546 30600
SINGRAULI STPS NTPC LTD THERMAL-COAL 200000 1394068 20400
TANDA TPS NTPC LTD THERMAL-COAL 44000 295438 40800
UNCHAHAR TPS I NTPC LTD THERMAL-COAL 42000 256454 39800
UNCHAHAR TPS II NTPC LTD THERMAL-COAL 42000 273577 38900
UNCHAHAR TPS III NTPC LTD THERMAL-COAL 21000 142780 43000
KOLDAM NTPC LTD HYDRO-HYDRO 80000 363260 43600
NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 303575 25841
RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 108000 668677 35374
NJHPS SJVNL HYDRO-HYDRO 150000 699496 23820
RAMPUR HPS SJVNL HYDRO-HYDRO 41202 195982 32260
TEHRI HPP THDC HYDRO-HYDRO 100000 272543 51800
KOTESHWAR HEP THDC HYDRO-HYDRO 40000 106244 53400
IGSTPS JHAJJAR ARAVALI P CPL THERMAL-COAL 150000 510429 49490
NEYVELI BARSINGSAR NEYVELI LIG CORP LTD THERMAL-LIG 25000 127520 38040
STATE SECTOR
PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 21000 14222 48200
PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 21000 19205 48400
PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 25000 102257 42600
PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 25000 62107 41800
DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 60000 312213 41000
RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 120000 35767442200
WYC HYDEL STATION HPGCL HYDRO-HYDRO 6240 20365 24900
GIRI POWER HOUSE HPSEB HYDRO-HYDRO 6000 13958 7600
ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 1695 5467 11900
BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 12000 18528 6700
GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 2250 7462 22500
BASSI POWER HOUSE HPSEB HYDRO-HYDRO 6600 29649 7500
BINWA POWER HOUSE HPSEB HYDRO-HYDRO 600 2749 19300
ANNEXURE-I
RATE OF SALE OF POWER FOR THE YEAR 2016-2017
Page 33
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) GAJ POWER HOUSE HPSEB HYDRO-HYDRO 1050 2914 26700
BANER POWER HOUSE HPSEB HYDRO-HYDRO 1200 2864 16200
HOLI POWER HOUSE HPSEB HYDRO-HYDRO 300 616 22500
THIROT POWER HOUSE HPSEB HYDRO-HYDRO 450 1126 22500
KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 1200 3064 22500
LARJI POWER HOUSE HPSEB HYDRO-HYDRO 12600 53677 23700
NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 250 750 31000
CHABA POWER HOUSE HPSEB HYDRO-HYDRO 175 465 23300
RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 150 101 13400
SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 200 000 22500
KILLAR HPSEB HYDRO-HYDRO 030 050 22500
BHABA AUGUMENP H HPSEB HYDRO-HYDRO 450 1276 22500
BS CHAMBA HPSEB HYDRO-HYDRO 045 099 19500
GUMMA HPSEB HYDRO-HYDRO 300 423 22500
GAS TURBINE POWER STATION IPGCL THERMAL-GAS 27000 67233 39300
PPS-I PPCL THERMAL-GAS 33000 175905 38300
PPS-III PPCL THERMAL-GAS 137120 196879 36100
LOWER JHELUM JampKPDD HYDRO-HYDRO 10500 60214 5100
UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 2260 10514 6300
UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 10500 44202 8500
GANDHARBAL JampKPDD HYDRO-HYDRO 1500 8925 4700
KARNAH MPH JampKPDD HYDRO-HYDRO 200 1122 31000
CHENANI I JampKPDD HYDRO-HYDRO 2330 10892 6600
CHENANI II JampKPDD HYDRO-HYDRO 200 1188 9300
CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 750 3634 14200
IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 375 2108 18500
IGO MERCHELLONG JampKPDD HYDRO-HYDRO 300 1572 29700
PAHALGAM MHP JampKPDD HYDRO-HYDRO 450 1713 32900
MARPACHOO JampKPDD HYDRO-HYDRO 075 375 29800
HAFTAL JampKPDD HYDRO-HYDRO 100 483 28700
SANJAK JampKPDD HYDRO-HYDRO 126 441 36000
SEWA-III JampKPDD HYDRO-HYDRO 900 3273 20200
BHADERWAH JampKPDD HYDRO-HYDRO 150 935 8900
BAZGO JampKPDD HYDRO-HYDRO 030 108 33300
SUMOOR JampKPDD HYDRO-HYDRO 010 045 35400
HUNDER JampKPDD HYDRO-HYDRO 040 176 26200
STAKNA JampKPDD HYDRO-HYDRO 400 1933 4100
KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 124000 662879 31360
SURATGARH TPS RRVUNL THERMAL-COAL 150000 402328 41730
CHHABRA TPS 1amp 2 RRVUNL THERMAL-COAL 50000 305946 36700
CHHABRA TPS 3 RRVUNL THERMAL-COAL 25000 151536 36700
CHHABRA TPS 4 RRVUNL THERMAL-COAL 25000 155896 36700
RAMGARH GT POWER PROJECT RRVUNL THERMAL-COAL 22050 43177 41800
RAMGARH GAS T P PROJECT 3 RRVUNL THERMAL-GAS 5000 93615 41800
DHOLPUR C C POWER PROJECT RRVUNL THERMAL-R-LNG 33000 9486 46110
MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 14000 20855 34192
MINI MICRO HYDEL (MMH) P S RRVUNL HYDRO-HYDRO 2385 851 37800
KALISINDH TPP 1 RRVUNL THERMAL-COAL 60000 341543 45000
KALISINDH TPP 2 RRVUNL THERMAL-COAL 60000 211588 45000
KHARA HEP UPJVNL HYDRO-HYDRO 7200 26654 7200
MATATILLA HEP UPJVNL HYDRO-HYDRO 3060 12219 6500
OBRA HEP UPJVNL HYDRO-HYDRO 9900 21517 6300
RIHAND UPJVNL HYDRO-HYDRO 30000 57369 5500
ANPARA A TPS UPRVUNL THERMAL-COAL 63000 317536 27000
ANPARA B TPS UPRVUNL THERMAL-COAL 100000 705605 22700
ANPARA D UPRVUNL THERMAL-COAL 100000 300158 39800
HARDUAGANJ TPS UPRVUNL THERMAL-COAL 16500 45817 49200
HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 50000 304389 46600
OBRA A TPS UPRVUNL THERMAL-COAL 28800 13158 34000
OBRA B TPS UPRVUNL THERMAL-COAL 100000 328124 21900
Page 34
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) PANKI TPS UPRVUNL THERMAL-COAL 21000 66488 50300
PARICHHA TPS UPRVUNL THERMAL-COAL 22000 38762 49400
PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 42000 231931 45600
PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 50000 276722 50400
CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 24000 70845 8290
CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 14400 75366 8390
DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 3375 9595 12080
DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 5100 18701 10520
KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4140 17359 12330
KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 12000 33001 9420
KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 3000 11953 8320
TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 9000 33983 12460
MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 30400 124510 16110
RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 19800 17897 10550
MPUR UTTARAKHAND JVNL HYDRO-HYDRO 930 5121 19200
PATHRI UTTARAKHAND JVNL HYDRO-HYDRO 2040 11636 14200
GALOGI UTTARAKHAND JVNL HYDRO-HYDRO 300 648 12500
PRIVATE SECTOR
MGTPP CLP INDIA PVT LTD THERMAL-COAL 132000 268902 41940
SHRINAGAR HEP ALAKNANDA HPCL HYDRO-HYDRO 33000 127414 48800
GAMA INFRAPROP CCPP GAMA INFRAPROP PVT THERMAL-GAS 22500 52686 47000
PPGCL (BARA) JP POWER VENTURES LTD THERMAL-COAL 198000 448200 38500
MALANA HEP MALANA PCL HYDRO-HYDRO 8600 26354 29792
MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 10000 30369 32580
ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 19200 56347 36079
KASHANG HEP H P PCL HYDRO-HYDRO 19500 5034 29200
BASPA-II HEP HBPCL HYDRO-HYDRO 30000 132769 13600
KARCHAM WANGTOO HEP HBPCL HYDRO-HYDRO 100000 434386 36600
RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 108000 582600 43700
RITHALA COMBI CY POWER PLANT TATA POWER DDL THERMAL-GAS 9480 000 11900
RAJPURA TPS NABHA POWER LTD THERMAL-GAS 140000 901484 39000
TALWANDI SABO POWER LTD TALWANDI SABO POWER LTD THERMAL-COAL 198000 636040 49548
ROJA THERMAL POWER STATION ROJA POWER SCL THERMAL-COAL 120000 727200 43400
KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 34400 63400
BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 36000 62600
MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 38200 60800
UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 37900 61500
KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 42300 58800
LALITPUR PGCL BAJAJ ENERGY PVT LTD THERMAL-COAL 198000 359400 47300
PRAYAGRAJ PGCL PRAYAGRAJ PGCL THERMAL-COAL 132000 448200 38595
KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 132000 783182 33438
WESTERN REGION
CENTRAL SECTOR
INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 100000 325333 23892
OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 52000 141663 34001
GANDHAR CCPP NTPC LTD THERMAL-GAS 65739 221924 28700
KAWAS CCPP NTPC LTD THERMAL-GASN 65620 167929 27000
KORBA I amp II NTPC LTD THERMAL-COAL 210000 1499171 20500
KORBA III NTPC LTD THERMAL-COAL 50000 358746 26600
SIPAT STPS I NTPC LTD THERMAL-COAL 198000 1479902 26800
SIPAT STPS II NTPC LTD THERMAL-COAL 100000 766549 26500
VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 126000 693142 25800
VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 100000 608781 23800
VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 100000 673475 27600
VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 100000 655924 32900
VINDHYACHAL STPS V NTPC LTD THERMAL-COAL 50000 328265 31700
MOUDA I NTPC LTD THERMAL-COAL 100000 343130 44500
MOUDA Ii NTPC LTD THERMAL-COAL 66000 40637 39900
RATNAGIRI GAS amp POWER PVT LTD RGPPL THERMAL-GAS 196708 442485 47000
KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 000 24729
TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 32000 201227 10740
Page 35
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 365122 19069
TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 787444 29324
STATE SECTOR
GSEG-HAZIRA15610 MW GUJARAT S ENEGEN LTD THERMAL-GAS 15610 1805 28200
GSEG-HAZIRA35143 MW GUJARAT S ENEGEN LTD THERMAL-GAS 35130 22276 51300
GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 21978 51800
AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 13929 26100
KORBA TPS EAST CSPGCL THERMAL-COAL 44000 198673 33880
DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 365808 27570
KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 316500 30420
HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 532878 19410
CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 515 58300
MTTPS CHAMPA U-I CSPGCL THERMAL-COAL 50000 220376 39000
MTTPS CHAMPA U-II CSPGCL THERMAL-COAL 50000 23709 10000
SHP GANGREL CSPGCL HYDRO-HYDRO 1000 2350 36790
BANGO HEP CSPGCL HYDRO-HYDRO 12000 14662 8900
MHP KORBA WEST CSPGCL HYDRO-HYDRO 170 859 38190
SIKASAR HEP CSPGCL HYDRO-HYDRO 700 418 26870
DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8843 74500
DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 19446 51500
GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 66388 71600
GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127488 41300
KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 96072 43900
KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 29841 56400
SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 184966 58800
UKAI 1-5 GSECL THERMAL-COAL 85000 204891 46900
UKAI TPS 6 GSECL THERMAL-COAL 50000 284448 48200
WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 271999 58300
WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 82808 44100
KADANA HPS GSECL HYDRO-HYDRO 24200 34433 16800
UKAI HPS GSECL HYDRO-HYDRO 30500 40585 6100
TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 123000 11500
BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 8900 10900
BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 7200 27500
JHINNA HPS MPPGCL HYDRO-HYDRO 2000 9700 18500
RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 44300 3400
GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 17300 4600
SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 4100 16900
MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 14600 27000
PENCH HPS MPPGCL HYDRO-HYDRO 16000 23700 8100
RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 3000 16900
AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 134400 35100
SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 283800 38700
SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 344600 34300
SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 111600 61600
SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 211800 58000
SSTPS PH-I MPPGCL THERMAL-COAL 120000 233100 84300
BHUSAWAL TPS MSPGCL THERMAL-COAL 142000 566258 51100
CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1365682 33700
KHAPERKHEDA MSPGCL THERMAL-COAL 134000 706207 39100
KORADI TPS MSPGCL THERMAL-COAL 62000 443206 42000
NASIK TPS MSPGCL THERMAL-COAL 63000 297275 47000
PARLI TPS MSPGCL THERMAL-COAL 113000 175934 71600
PARAS MSPGCL THERMAL-COAL 50000 267931 38700
URAN CCPP MSPGCL THERMAL-GAS 67200 320330 30600
KOYANA MSPGCL HYDRO-HYDRO 195600 328155 13100
SMALL HYDRO POWER PLANTS MSPGCL HYDRO-HYDRO 45400 93062 30500
BHIRA MSPGCL HYDRO-HYDRO 8000 10046 8400
TILLARI MSPGCL HYDRO-HYDRO 8900 10584 3100
SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 233298 20500
SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 87633 20500
PRIVATE SECTOR
Page 36
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 81282 46750
JNSTPP(JAYPEE NIGRIE) JP POWER VENTURES LTD THERMAL-COAL 132000 726695 29310
MB POWER MB POWER THERMAL-COAL 120000 345632 38310
ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 754922 28671
ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 780761 23495
ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 198000 1263784 32090
ADANI POWER MAHARA ADANI POWER LTD THERMAL-COAL 330000 1666191 34124
AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 170065 36827
SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 252035 45129
ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 458551 36000
ESSAR POWER MP LTD ESSAR POWER MP LTD THERMAL-COAL 60000 243040 28600
VEDANTA LTD (P P -I) VEDANTA LTD THERMAL-GAS 3000 15044 24000
VEDANTA LTD (P P -II) VEDANTA LTD THERMAL-GAS 3000 21293 24000
PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 8234600 24000
165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 5850 64390
145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 68717 40349
SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 132655 28776
SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 144686 38567
MUNDRA UMPPCOASTAL GUJARAT POWER
LTD THERMAL-IMP COAL 400000 2530300
23900
LANCO AMARKANTAK TPP PATHADIH
U-ILANCO AMARKAN POWER LTD THERMAL-COAL 30000 195500
29200
LANCO AMARKANTAK TPP PATHADIH
U-IILANCO AMARKAN POWER LTD THERMAL-COAL 30000 206900
27600
BARADARHA TPS D B POWER LTD THERMAL-COAL 120000 677373 29200
JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 405000 28900
JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 453000 40500
DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 339437 40700
TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 293400 44000
TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 137200 37000
TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 174900 44000
BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 92900 14100
BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23700 34300
KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 27600 48300
CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2530300 23900
BHANDARDRA HEP -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 2475 54900
SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 161400 26500
SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 445000 39000
SOTHERN REGION
CENTRAL SECTOR
NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 325699 54820
NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 305532 39880
NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 998805 38510
NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 113016 54070
NEYVELI TAMILNADU POWER LTD JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 625274 42200
VALLUR TPS NTPC TECL THERMAL-COAL 150000 856438 42350
R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 1493 84300
RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1502919 29400
RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 341291 31800
SIMHADRI I NTPC LTD THERMAL-COAL 100000 688382 36800
SIMHADRI II NTPC LTD THERMAL-COAL 100000 663657 43400
KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 593110 31324
MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 291625 21764
KKNPP-1 amp 2 NPCIL NUCLEAR-NUCLEAR 200000 572609 40948
MINICOY LAKSHADEEP THERMAL-DIESEL 340 770 29600
KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1097 29600
AMINI LAKSHADEEP THERMAL-DIESEL 265 509 29600
ANDROTT LAKSHADEEP THERMAL-DIESEL 219 524 29600
KALPENI LAKSHADEEP THERMAL-DIESEL 175 356 29600
AGATTI LAKSHADEEP THERMAL-DIESEL 195 658 29600
KADMAT LAKSHADEEP THERMAL-DIESEL 190 414 29600
KILTAN LAKSHADEEP THERMAL-DIESEL 150 269 29600
CHETLET LAKSHADEEP THERMAL-DIESEL 100 139 29600
BITRA LAKSHADEEP THERMAL-DIESEL 043 024 29600
BANGARAM LAKSHADEEP THERMAL-DIESEL 018 009 29600
Page 37
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) STATE SECTOR
Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 721811 46500
Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 50000 336142 46500
RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 237358 46500
RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 239926 46500
RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 124500 46500
SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 62109 46500
UPPER SILERU APGENCO HYDRO-HYDRO 24000 33000 46500
LOWER SILERU APGENCO HYDRO-HYDRO 46000 81066 46500
DONKARAI APGENCO HYDRO-HYDRO 2500 6007 46500
PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 1262 46500
CHETTIPETA APGENCO HYDRO-HYDRO 100 214 46500
MUCHKUND APGENCO HYDRO-HYDRO 12000 37571 46500
NAGARJUNASAGAR RCPH APGENCO HYDRO-HYDRO 9000 606 46500
TUNGABHADRA HES amp HAMPI(AP
Share)
APGENCO HYDRO-HYDRO 7200 6100 46500
KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 352232 42600
KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 288131 32500
KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 319272 46500
RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 40073 44300
KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 308317 46000
KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 308963 51300
SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 61004 76600
NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 17960 75300
PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 20873 58300
POCHAMPAD-I TSPGENCO HYDRO-HYDRO 2700 5455 29800
POCHAMPAD-II TSPGENCO HYDRO-HYDRO 900 1932 40700
NIZAMSAGAR TSPGENCO HYDRO-HYDRO 1000 1126 53400
RAICHUR TPS 1 to 7 KPCL THERMAL-COAL 147000 890866 43800
RAICHUR TPS 8 KPCL THERMAL-COAL 25000 159523 48200
BELLARI TPS 1 KPCL THERMAL-COAL 50000 318679 51100
BELLARI TPS 2 KPCL THERMAL-COAL 50000 232347 55600
BELLARI TPS 3 KPCL THERMAL-COAL 70000 47565 34400
BHADRA PH KPCL HYDRO-HYDRO 3920 2369 45900
GERUSUPPA PH KPCL HYDRO-HYDRO 24000 26990 22000
GHAT PRABHA HEP KPCL HYDRO-HYDRO 3200 4777 25300
KADRA HPS KPCL HYDRO-HYDRO 15000 16889 26800
NAGJHARI KPCL HYDRO-HYDRO 90000 155159 9800
KODASALLI DPH KPCL HYDRO-HYDRO 12000 14854 19200
MUNIRA+MGH+SPH+SPH KPCL HYDRO-HYDRO 22640 48211 7900
SHARAVATHY HPS KPCL HYDRO-HYDRO 108550 276215 5400
ALMATTI DPH KPCL HYDRO-HYDRO 29000 39611 24600
VARAHI UGPH KPCL HYDRO-HYDRO 46000 71368 15600
IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 17196 15300
IDUKKI HPS KSEB HYDRO-HYDRO 78000 137905 15300
KAKKAD HPS KSEB HYDRO-HYDRO 5000 13063 15300
KALLADA HPS KSEB HYDRO-HYDRO 1500 4436 15300
KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 46544 15300
KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 635 15300
LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 30822 15300
MALANKARA HPS KSEB HYDRO-HYDRO 1050 2474 15300
MATTUPETTY KSEB HYDRO-HYDRO 200 230 15300
MALAMPUZHA KSEB HYDRO-HYDRO 250 063 15300
CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 864 15300
URUMI ST I amp II KSEB HYDRO-HYDRO 615 903 15300
LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 248 15300
NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7765 19625 15300
PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 16601 15300
PANNIAR HPS KSEB HYDRO-HYDRO 3240 6217 15300
PORINGALKUTHU KSEB HYDRO-HYDRO 3600 10052 15300
PORINGALKUTHU LBE KSEB HYDRO-HYDRO 1600 9438 15300
PEPPARA KSEB HYDRO-HYDRO 300 395 15300
POOZHITHODE KSEB HYDRO-HYDRO 480 1045 15300
Page 38
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) PEECHI KSEB HYDRO-HYDRO 125 040 15300
RANI-PERUNADU KSEB HYDRO-HYDRO 400 585 15300
SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 79783 15300
SENGULAM HPS KSEB HYDRO-HYDRO 5120 11558 15300
SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 16711 15300
VILANGAD KSEB HYDRO-HYDRO 750 1578 15300
BARAPOLE KSEB HYDRO-HYDRO 1500 1932 15300
VELLATHOOVAL KSEB HYDRO-HYDRO 360 305 15300
CHIM0NY KSEB HYDRO-HYDRO 250 156 15300
ADYANPARA KSEB HYDRO-HYDRO 350 501 15300
BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 554 15300
KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 3801 15300
KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 23132 32800
ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 14416 62280
METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 523970 62280
METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 321270 62280
NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 336575 62280
NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 591240 62280
TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 508966 62280
KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 30897 62280
VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 18720 90699 62280
KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 33593 62280
BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 1047 62280
PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 1250 62280
PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 330 62280
MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 4897 62280
MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 032 62280
KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15681 62280
KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 40608 62280
KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 21342 62280
KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 4717 62280
KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4322 62280
KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2399 62280
METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 4416 62280
METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 8035 62280
BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2187 62280
BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2359 62280
BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2511 62280
BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 1949 62280
BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 1819 62280
POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 172 62280
SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 241 62280
MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 026 62280
THIRUMOORTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 136 62280
PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 9309 62280
VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 353 62280
SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 4192 62280
PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 6571 62280
SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 1186 62280
SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6319 62280
ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 6122 62280
KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 28674 62280
SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 18381 62280
SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 4258 62280
KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 12680 62280
KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4201 62280
ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 000 62280
PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 19175 62280
AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 078 62280
BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 504 62280
BHAVANI KATTALAI (BKB)(IIIampIII BB I amp II)TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 5847 62280
PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 000 62280
Page 39
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) SRI DAMODARAM STPS APPDCL THERMAL-COAL 160000 808108 36300
PRIVATE SECTOR
KARUPPUR TANJORE LANCO TANJORE PCL THERMAL-GAS 12000 48096 28770
SIMHAPURI ENERGY LTD SIMHAPURI ENERGY LTD THERMAL-COAL 60000 143900 39100
JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 7111 45500
SBU 1 JSW ENERGY LTD
VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 26000 159100
43300
SBU 2 JSW ENERGY LTD
VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 60000 247900
42800
LANCO KPLLANCO KONDAPALLI POWER
LTDTHERMAL-GAS 36814 85060
25776
LANCO KPL STG -IILANCO KONDAPALLI POWER
LTDTHERMAL-GAS 36600 12979
46330
LANCO KPL STG -IIIALANCO KONDAPALLI POWER
LTDTHERMAL-GAS 37100 85710
46330
LANCO KPL STG -III BLANCO KONDAPALLI POWER
LTDTHERMAL-GAS 37100 43639
46330
HINDUJA NATIONAL PCL HINDUJA NATIONAL PCL THERMAL-COAL 104000 303000 38200
MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 121164 49940
UDUPI POWER COR LTD ADANI POWER LTD THERMAL-COAL 120000 754613 42500
SPECTRUM POWER GENERATION
LTD SPECTRUM PG LTD THERMAL-GASN 20525 9256812
34952
TAQA NEYVELI POWER COM PVT
LTD TAQA NEYVELI THERMAL-LIG 25000 5840
34500
ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 251000 51000
ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 207860 36800
GMR VEMAGIRI POWER GENERATION
LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 30117
46450
EASTERN REGION
CENTRAL SECTOR
MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 64675 53113
MTPS STAGE - II KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 39000 1432 69138
BOKARO `B` TPS DVC THERMAL-COAL 63000 145670 31539
MEJIA TPS U 1-3 DVC THERMAL-COAL 63000 348298 31552
MEJIA TPS U 4 DVC THERMAL-COAL 21000 116099 34997
MEJIA TPS U 5-6 DVC THERMAL-COAL 50000 276427 35976
MEJIA TPS U 7-8 DVC THERMAL-COAL 100000 552854 36991
DURGAPUR STEEL TPS DVC THERMAL-COAL 100000 665550 39323
DURGAPUR TPS DVC THERMAL-COAL 21000 59270 35416
RAGHUNATHPUR TPS DVC THERMAL-COAL 120000 201650 35326
MAITHON HYDEL STA DVC HYDRO-HYDRO 6320 12200 17984
CHANDRAPURA TPSU1-3 DVC THERMAL-COAL 42000 257610 35095
CHANDRAPURA TPSU7-8 DVC THERMAL-COAL 50000 306673 34987
KODERMA TPS DVC THERMAL-COAL 100000 380180 38131
PANCHET HPS DVC HYDRO-HYDRO 8000 13360 17984
TILLAYA HPS DVC HYDRO-HYDRO 400 1410 17984
RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34700 35400
TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 277300 23200
TLDP -III NHPC LTD HYDRO-HYDRO 13200 55400 62000
TLDP -IV NHPC LTD HYDRO-HYDRO 16000 60300 25600
FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 957219 33700
FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 308943 41000
BONGAINGAON TPS NTPC LTD THERMAL-COAL 25000 153663 58600
KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 542277 34200
KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 942591 34200
BARH-II NTPC LTD THERMAL-COAL 132000 728021 44500
TALCHER TPS NTPC LTD THERMAL-COAL 46000 335521 30100
TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 702319 25600
TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1436521 24700
STATE SECTOR
BTPS(RampM) BIHAR STATE PGCL THERMAL-COAL 22000 12142 39700
BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 98331 10602
HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 50593 9482
CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 19689 2605
RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 53192 6033
UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 147208 14637
Page 40
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 60353 4519
IB TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 288567 25000
J P H GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 210 038 61100
MEYONG CHU GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 400 1086 61100
TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 122667 38200
DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 214339 43321
KOLAGHAT THERMAL POWER
STATION
WEST BENGAL PDCL THERMAL-COAL 126000 538269 31603
BAKRESHWAR THERMAL POWER
PLANT
WEST BENGAL PDCL THERMAL-COAL 105000 634876 32154
BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 45000 166855 33299
SANTHALDIH THERMAL POWER
STATION
WEST BENGAL PDCL THERMAL-COAL 50000 336442 34932
SAGARDIGHI THERMAL POWER
PROJECT
WEST BENGAL PDCL THERMAL-COAL 160000 423121 34705
JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 20344 68900
RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 24559 68900
TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 4623 68900
PURULIA PUMPED STORAGE
PROJECT
WEST BENGAL SEDCL HYDRO-HYDRO 90000 108816 68900
MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2768 68900
PRIVATE SECTOR
CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 49474 20230
CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 555500 70200
HALDIA ENERGY HALDIA ENERGY LTD THERMAL-COAL 60000 371000 50400
DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3688 63400
KAMALANGA TPS GMR KAMALANGA ENERGY LTD THERMAL-COAL 105000547670
33300
ADHUNIK POWER U-1 ADHUNIK POWER THERMAL-COAL 27000 158 44060
ADHUNIK POWER U-2 ADHUNIK POWER THERMAL-COAL 27000 168 44250
VL-JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 332800 23622
JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 43000 45250
JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 71700 37030
JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 70700 35920
JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 71100 38870
JOJOBERA UNIT 5 TATA POWER COM LTD THERMAL-COAL 12000 79300 44560
JOJOBERA UNIT 6 TATA POWER COM LTD THERMAL-WHR 12000 83700 12840
IEL KALINGANAGAR U-I TATA POWER COM LTD THERMAL-WG 6750 33400 22500
IEL KALINGANAGAR U-II TATA POWER COM LTD THERMAL-WG 6750 34800 22500
MAITHON UNIT 1 amp 2 TATA POWER COM LTD THERMAL-COAL 105000 678000 36100
HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 27500 24340
HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 28400 24340
HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 15800 24310
NORTH EASTERN REGION
CENTRAL SECTOR
LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 74100 36600
AGARTALA GT NEEPCO THERMAL-GAS 13500 88611 27210
ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 153111 32310
DOYANG HEP NEEPCO HYDRO-HYDRO 7500 25598 49801
KOPILI HEP NEEPCO HYDRO-HYDRO 20000 98186 11491
KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 19582 20237
KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 10310 17968
RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 124093 22945
TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 10100 17344 39000
STATE SECTOR
HYDRO POWER (122 Stns) ITANAGAR GOVT OF ARUNACHAL
PRADESHHYDRO-HYDRO 6971 6217270
24600
KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39514 17337
LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 82327 36810
NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 33318 48290
MYNTRIANG SHEP ST II ASSAM POWER GENCO HYDRO-HYDRO 300 567 35776
LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 9130 49200
LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 012 49200
DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 022 49200
TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 000 49200
UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 4990 16000
UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 6476 37000
UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 16494 14600
UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 3600 9556 15000
SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 758 8000
MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44070 44800
KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 154 41400
TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 091 41400
MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 411 41400
MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 394 41400
KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 760 41400
SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 3264 41400
LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 044 41400
BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 18953 28000
ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 43585 28200
GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 4080 11100
Note
LIG Lignite N Naptha WHR Waste Heat Recovery
Page 41
File NoCEA-CH-14-1142018-Coordination Division
Sector Oct-2017 Oct-2018
Central 6872 7355
State 5217 6078
Private 6045 6819
ALL INDIA 5882 6524
Month PLF 2017 PLF 2018
Jan 6014 6288
Feb 6153 6285
March 6313 6558
April 6493 6458
May 6355 6554
June 5672 5917
July 537 5545
Aug 5733 5639
Sep 5989 6109
Oct 5882 6524
For Coal and Lignite based Power Plants and Provisional based on Actual-Cum-Assesment
10
PLF of Thermal Power Plants
All India PLF of Thermal Plants (Excluding Gas Based Plants) Month-wise
10 All India PLF Sector-wise for Oct-2018
68
72
52
17
60
45
58
8273
55
60
78
68
19
65
24
000
1000
2000
3000
4000
5000
6000
7000
8000
Central State Private ALL INDIA
P
LF
Oct-2017 Oct-2018
0
10
20
30
40
50
60
70
Jan Feb March April May June July Aug Sep Oct
Months
All India PLF Month-wise
PLF 2017 PLF 2018
File NoCEA-CH-14-1142018-Coordination Division
2012-13 2013-14 2014-15 2015-16 2016-17
TampD Losses 2304 2284 2277 2181 2142
ATampC Losses 2548 2258 2462
Note As per PFC for utilities selling directly to consumers
Total Number of Villages
597464
Note From the year 2004-05 onwards Definition of Village Electrification-
A village would be declared Electrified if
Without
Subsidy
Gap ACS-
ARR(
Without
Subsidy)
Paiseunit
Gap ACS-
ARR (on
subsidy
booked
basis)
paiseunit
Gap ACS-
ARR (on
subsidyrece
ived basis)
paiseunit
2013-14 400 118 76 77
2014-15 412 108 58 60
Source- PFC Reports on the performance of State Power Utilities
2013-14 4894
2014-15 5304
2015-16 5459
2016-17 5743
2017-18 6080
11
Average cost of supply(ACS)
(paiseunit)
i) Basic Infrastructure such as Distribution Transformer and Distribution lines are provided in the inhabited locality
as well as Dalit Basti hemlet where it exists (For electrification through Non-Conventional Energy Sources a
Distribution Transformer may not be necessary)
14 All India Coal consumption for Power Generation (MT)
520
Average Revenue Realization(paiseunit)
518
Year
ii) Electricity is provided to Public places like Schools Panchayat Office Health Centre Dispensaries Community
Centres etc and
iv) Mandatory Certification from Gram Panchayat regarding the completion of village electrification should be
obtained
13 Average cost of Power amp Average Realisation
iii) The number of households electrified should be at least 10 of the total number of households in the village
11 T amp D and ATampC Losses ()
12 All India Village Electrification
Villiages Electrified (Nos)
10000All villages as per census 2011 has
been electrified on 28042018
Villages electrified
File NoCEA-CH-14-1142018-Coordination Division
SN Contents Page
1 Capacity Addition Targets and Achievements in 12th Plan 12
2 Capacity Addition Targets amp Achievements during Oct-2018 and April 2018- Oct 2018 13
3 Installed Capacity in various Regions including their shares 14-19
Section B - Capacity Addition
File NoCEA-CH-14-1142018-Coordination Division
Figures in MW
TARGET ACH TARGET ACH TARGET ACH TARGET ACH
CENTRAL 14878 15869 6004 2584 5300 2000 26182 20453
STATE 13922 22201 1608 2276 0 0 15530 24477
PRIVATE 43540 53661 3285 619 0 0 46825 54280
ALL INDIA 72340 91730 10897 5479 5300 2000 88537 99209
Figures in MW
Thermal Hydro Nuclear Total
Target Ach Target Ach Target Ach Target Ach
Central 4880 3170 800 390 500 6180 3560 5761
State 3546 1760 300 200 0 3846 1960 5096
Private 2940 3780 205 205 0 3145 3985 12671
Total 11366 8710 1305 795 500 0 13171 9505 7217
12
2 CAPACITY ADDITION TARGET AND ACHIEVEMENT FOR 2017-18 (IN MW)
1 Capacity Addtion Targets and Achievements in the 12th Plan
SECTORTHERMAL HYDRO NUCLEAR TOTAL
File NoCEA-CH-14-1142018-Coordination Division
(MW)
Cummulative
Deviation
Target Achievement Target Achievement (+) (-)
Central 2760 250 0 250 0 -250
State 450615 1030 0 1030 69755 -960245
Private 0 0 600 0 600 600
Total 726615 1280 600 1280 669755 -610245
Central 710 0 0 110 110 0
State 130 0 0 12999 30 -9999
Private 0 0 0 0 0 0
Total 840 0 0 23999 140 -9999
Nuclear Central 0 0 0 0 0 0
Central 3470 250 0 360 110 -250
State 463615 1030 0 115999 99755 -1060235
Private 0 0 600 0 600 600
Total 810615 1280 600 151999 809755 -710235
Electricity Generation (MU) Targets and Achievements for 2016-17
13
2 Capacity Addition Targets Achievements During Oct-2018
Schemes Sector
Target 2018-19
April 2018- Oct 2018Oct-18
Hydro
All India
Capacity Addition TargetsAchievements during the Month of Oct-2018
Thermal
12
80
24
0
0
15
20
67
0
14
0
0
81
0
0
200
400
600
800
1000
1200
1400
1600
Thermal Hydro Nuclear Total
MW
Targets and Achievement during 2018-19Target Achievement
600
0 00 0
600
0
100
200
300
400
500
600
700
800
900
1000
Target Achievement
MW
Targets and Achievement during Oct 2018Thermal Hydro
Nuclear Total
File NoCEA-CH-14-1142018-Coordination Division
Coal Gas Diesel Total
State 1593400 287920 000 1881320 000 869755 68956 2820031
Private 2276083 55800 000 2331883 000 251400 1261535 3844818
Central 1258537 234406 000 1492943 162000 849622 32900 2537465
Sub Total 5128020 578126 000 5706146 162000 1970777 1363391 9202314
State 2128000 284982 000 2412982 000 544650 31119 2988751
Private 3488567 467600 000 3956167 000 48100 2005170 6009437
Central 1504295 328067 000 1832362 184000 162000 66130 2244492
Sub Total 7120862 1080649 000 8201511 184000 754750 2102418 11242679
State 1943250 79198 28788 2051236 000 1183803 52102 3287141
Private 1212450 532210 47370 1792030 000 000 3495815 5287845
Central 1422502 35958 000 1458460 332000 000 49190 1839650
Sub Total 4578202 647366 76158 5301726 332000 1183803 3597107 10414636
State 695000 10000 000 705000 000 353792 22511 1081303
Private 637500 000 000 637500 000 39900 84853 762253
Central 1387664 000 000 1387664 000 100520 1000 1489184
Sub Total 2720164 10000 000 2730164 000 494212 108364 3332740
State 000 49771 3600 53371 000 42200 25674 121245
Private 000 2450 000 2450 000 000 2571 5021
Central 52002 125360 000 177362 000 103000 500 280862
Sub Total 52002 177581 3600 233183 000 145200 28745 407128
State 000 000 4005 4005 000 000 525 4530
Private 000 000 000 000 000 000 221 221
Central 000 000 000 000 000 000 510 510
Sub Total 000 000 4005 4005 000 000 1256 5261
State 6359650 711871 36393 7107913 000 2994200 200887 10303000
Private 7614600 1058060 47370 8720030 000 339400 6850164 15909594
Central 5625000 723791 000 6348791 678000 1215142 150230 8392163
Total 19599250 2493722 83763 22176734 678000 4548742 7201281 34604757
Figures at decimal may not tally due to rounding off
Note -
(As per latest information available with MNRE)
Break up of RES all India as on 30092018 is given below (in MW)
450695 3461510 2402166 7201281
A Oct 2018 669755 MW
B Capacity Retired
during
Oct 2018 705 MW
C Oct 2018 0 MW
D Oct 2018 A-B+C -35245 MW
Share of Telangana from JEGURUPADU CCPP Ph II has been removed and the same has been added to private sector of Andhra Pradesh due to expiry of PPA as per
request from TS Transco
Region
ALL INDIA INSTALLED CAPACITY (IN MW) OF POWER STATIONS (As on 31102018)
(UTILITIES)
Net Capacity Added during
1 RES include SHP BP UampI Solar and Wind Energy Installed capacity in respect of RES (MNRE) as on 30092018
Small
Hydro PowerWind Power
Bio-PowerSolar Power
Total
CapacityBM PowerCogen Waste to Energy
2 U-1 to 7 (76995=69755 MW) of LAKWA REPLACEMENT POWER PROJECT commissioned in April 2018 but intimated in October 2018
has been added to state sector of Assam
1 Badarpur TPS (705 MW) has been retired from central sector of Northern Region
Capacity Up-rated
Ownership Sector
873080 13830
Capacity Added during
1 U-2 (600 MW) of MAHAN TPP has been commissioned and added to private sector of Madhya Pradesh
Grand TotalThermalNuclear Hydro
Islands
ALL INDIA
Abbreviation- SHP=Small Hydro Project (le 25 MW) BP=Biomass Power UampI=Urban amp Industrial Waste Power RES=Renewable Energy Sources
Northern Region
Western Region
Southern Region
Eastern Region
North Eastern
Region
RES
(MNRE)
Modewise breakup
File NoCEA-CH-14-1142018-Coordination Division
Coal Gas Diesel Total
State 13500 180040 000 193540 000 000 000 193540
Private 86922 10800 000 97722 000 000 12157 109879
Central 311272 20701 000 331973 10283 72309 000 414565
Sub-Total 411694 211541 000 623235 10283 72309 12157 717984
State 272000 15000 000 287000 000 110282 5930 403212
Private 408078 000 000 408078 000 20000 34745 462823
Central 129472 53561 000 183034 10094 66370181 500 259998
Sub-Total 809550 68561 000 878112 10094 196652 41175 1126032
State 000 000 000 000 000 69460 25661 95121
Private 000 000 000 000 000 99200 60536 159736
Central 18340 6201 000 24541 2895 122388 000 149824
Sub-Total 18340 6201 000 24541 2895 291048 86197 404681
State 000 17500 000 17500 000 123000 12903 153403
Private 000 000 000 000 000 000 5985 5985
Central 50639 12907 000 63547 6798 109188 000 179533
Sub-Total 50639 30407 000 81047 6798 232188 18888 338921
State 176000 15000 000 191000 000 259770 12780 463550
Private 511550 000 000 511550 000 28800 115462 655812
Central 85458 26401 000 111859 19681 92342 000 223882
Sub-Total 773008 41401 000 814409 19681 380912 128242 1343244
State 585000 60380 000 645380 000 109618 2385 757383
Private 388200 000 000 388200 000 10400 710680 1109280
Central 120625 22110 000 142735 55674 73901 29400 301710
Sub-Total 1093825 82490 000 1176315 55674 193919 742465 2168373
State 546900 000 000 546900 000 72410 2510 621820
Private 871433 000 000 871433 000 84200 266691 1222324
Central 379639 54949 000 434588 28948 180253 3000 646789
Sub-Total 1797972 54949 000 1852921 28948 336863 272201 2490933
State 000 000 000 000 000 125215 6787 132002
Private 9900 45000 000 54900 000 8800 52244 115944
Central 34324 6966 000 41290 3124 47554 000 91968
Sub-Total 44224 51966 000 96190 3124 181569 59031 339914
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 3035 3035
Central 3815 1503 000 5317 801 10171 000 16289
Sub-Total 3815 1503 000 5317 801 10171 3035 19324
124953 29105 000 154058 23703 75145 000 252907
State 1593400 287920 000 1881320 000 869755 68956 2820031
Private 2276083 55800 000 2331883 000 251400 1261535 3844818
Central 1258537 234406 000 1492943 162000 849622 32900 2537465
Grand Total 5128020 578126 000 5706146 162000 1970777 1363391 9202314
Uttar Pradesh
Uttarakhand
Chandigarh
Grand TotalThermalNuclear
Hydro
(Renewable)
RES
(MNRE)
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
NORTHERN REGION
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
(As on 31102018)
Central - Unallocated
Total (Northern
Region)
Delhi
Haryana
Himachal Pradesh
Jammu amp Kashmir
Punjab
Rajasthan
State Ownership Sector
Modewise breakup
File NoCEA-CH-14-1142018-Coordination Division
(As on 31102018)
Coal Gas Diesel Total
State 000 000 000 000 000 000 005 005
Private 000 4800 000 4800 000 000 091 4891
Central 45478 1967 000 47445 2600 000 000 50045
Sub-Total 45478 6767 000 52245 2600 000 096 54941
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 1301 1301
Central 12663 4334 000 16997 700 000 000 17697
Sub-Total 12663 4334 000 16997 700 000 1301 18998
State 475000 217782 000 692782 000 77200 800 770782
Private 776567 396000 000 1172567 000 000 729782 1902349
Central 309051 42400 000 351451 55900 000 23830 431181
Sub-Total 1560618 656182 000 2216800 55900 77200 754412 3104312
State 408000 000 000 408000 000 170366 8396 586762
Private 617400 10000 000 627400 000 000 378205 1005605
Central 279441 25700 000 305141 27300 152000 30000 514441
Sub-Total 1304841 35700 000 1340541 27300 322366 416601 2106808
State 228000 000 000 228000 000 12000 1105 241105
Private 849000 000 000 849000 000 000 52430 901430
Central 195344 000 000 195344 4800 10000 000 210144
Sub-Total 1272344 000 000 1272344 4800 22000 53535 1352679
State 1017000 67200 000 1084200 000 285084 20813 1390097
Private 1245600 56800 000 1302400 000 48100 842815 2193315
Central 433475 227273 000 660748 69000 000 12300 742048
Sub-Total 2696075 351273 000 3047348 69000 333184 875927 4325459
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 546 546
Central 17444 6634 000 24078 900 000 000 24978
Sub-Total 17444 6634 000 24078 900 000 546 25524
211400 19759 000 231159 22800 000 000 253959
State 2128000 284982 000 2412982 000 544650 31119 2988751
Private 3488567 467600 000 3956167 000 48100 2005170 6009437
Central 1504295 328067 000 1832362 184000 162000 66130 2244492
Grand Total 7120862 1080649 000 8201511 184000 754750 2102418 11242679
Central - Unallocated
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
WESTERN REGION
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
State Ownership Sector
Modewise breakup
Grand TotalThermalNuclear
Hydro
(Renewable)
RES
(MNRE)
Total (Western
Region)
Goa
Daman amp Diu
Gujarat
Madhya Pradesh
Chhattisgarh
Maharashtra
Dadra amp Nagar
Naveli
File NoCEA-CH-14-1142018-Coordination Division
(As on 31102018)
Coal Gas Diesel Total
State 501000 23540 000 524540 000 167360 4875 696775
Private 387388 381318 3680 772386 000 000 693073 1465459
Central 167456 000 000 167456 12727 000 25000 205183
Sub-Total 1055844 404858 3680 1464382 12727 167360 722948 2367417
State 508250 000 000 508250 000 247993 4022 760265
Private 83945 83182 000 167127 000 000 375048 542175
Central 195612 000 000 195612 14873 000 1000 211485
Sub-Total 787807 83182 000 870989 14873 247993 380070 1513925
State 502000 000 12792 514792 000 359980 15533 890305
Private 195850 000 2520 198370 000 000 1275640 1474010
Central 282920 000 000 282920 69800 000 000 352720
Sub-Total 980770 000 15312 996082 69800 359980 1291173 2717035
State 000 000 15996 15996 000 188150 15402 219548
Private 61500 17400 000 78900 000 000 20899 99799
Central 114322 35958 000 150280 36200 000 5000 191480
Sub-Total 175822 53358 15996 245176 36200 188150 41301 510827
State 432000 52408 000 484408 000 220320 12270 716998
Private 483767 50310 41170 575247 000 000 1130984 1706231
Central 448952 000 000 448952 144800 000 18190 611942
Sub-Total 1364719 102718 41170 1508607 144800 220320 1161444 3035171
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 000 000
Central 10000 000 000 10000 000 000 000 10000
Sub-Total 10000 000 000 10000 000 000 000 10000
State 000 3250 000 3250 000 000 000 3250
Private 000 000 000 000 000 000 171 171
Central 24840 000 000 24840 8600 000 000 33440
Sub-Total 24840 3250 000 28090 8600 000 171 36861
178400 000 000 178400 45000 000 000 223400
State 1943250 79198 28788 2051236 000 1183803 52102 3287141
Private 1212450 532210 47370 1792030 000 000 3495815 5287845
Central 1422502 35958 000 1458460 332000 000 49190 1839650
Grand Total 4578202 647366 76158 5301726 332000 1183803 3597107 10414636
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
SOUTHERN REGION
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
State Ownership Sector
Modewise breakup
Grand TotalThermal RES
(MNRE)Nuclear
Hydro
(Renewable)
Kerala
Tamil Nadu
NLC
Puducherry
Central - Unallocated
Total (Southern
Region)
Andhra Pradesh
Telangana
Karnataka
File NoCEA-CH-14-1142018-Coordination Division
(As on 31102018)
Coal Gas Diesel Total
State 71000 000 000 71000 000 000 7070 78070
Private 28100 000 000 28100 000 000 25545 53645
Central 291433 000 000 291433 000 11000 000 302432
Sub-Total 390533 000 000 390533 000 11000 32615 434147
State 42000 000 000 42000 000 13000 405 55405
Private 73000 000 000 73000 000 000 3207 76207
Central 39374 000 000 39374 000 6100 000 45474
Sub-Total 154374 000 000 154374 000 19100 3612 177086
State 540000 10000 000 550000 000 98600 9195 657795
Private 242500 000 000 242500 000 000 34452 276952
Central 76077 000 000 76077 000 41000 000 117077
Sub-Total 858577 10000 000 868577 000 139600 43647 1051824
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 000 000
Central 698504 000 000 698504 000 18620 000 717124
Sub-Total 698504 000 000 698504 000 18620 000 717124
State 42000 000 000 42000 000 206192 630 248822
Private 293900 000 000 293900 000 000 21648 315548
Central 163390 000 000 163390 000 8900 1000 173290
Sub-Total 499290 000 000 499290 000 215092 23278 737660
State 000 000 000 000 000 36000 5211 41211
Private 000 000 000 000 000 39900 001 39901
Central 8703 000 000 8703 000 6400 000 15103
Sub-Total 8703 000 000 8703 000 82300 5212 96215
110183 000 000 110183 000 8501 000 118684
State 695000 10000 000 705000 000 353792 22511 1081303
Private 637500 000 000 637500 000 39900 84853 762253
Central 1387664 000 000 1387664 000 100520 1000 1489184
Grand Total 2720164 10000 000 2730164 000 494212 108364 3332740
(As on 31102018)
Coal Gas Diesel Total
State 000 32821 000 32821 000 10000 3001 45822
Private 000 2450 000 2450 000 000 1680 4130
Central 27902 43556 000 71458 000 36851 000 108309
Sub-Total 27902 78827 000 106729 000 46851 4681 158261
State 000 000 000 000 000 000 10710 10710
Private 000 000 000 000 000 000 539 539
Central 2470 4682 000 7152 000 11800 000 18952
Sub-Total 2470 4682 000 7152 000 11800 11249 30201
State 000 000 000 000 000 32200 3103 35303
Private 000 000 000 000 000 000 006 006
Central 3040 10969 000 14009 000 7446 000 21455
Sub-Total 3040 10969 000 14009 000 39646 3109 56764
State 000 16950 000 16950 000 000 1601 18551
Private 000 000 000 000 000 000 009 009
Central 3740 43695 000 47435 000 7077 500 55012
Sub-Total 3740 60645 000 64385 000 7077 2110 73572
State 000 000 3600 3600 000 000 545 4145
Private 000 000 000 000 000 000 217 217
Central 3140 7157 000 10297 000 9677 000 19974
Sub-Total 3140 7157 3600 13897 000 9677 762 24336
State 000 000 000 000 000 000 3067 3067
Private 000 000 000 000 000 000 100 100
Central 2140 4893 000 7033 000 5860 000 12893
Sub-Total 2140 4893 000 7033 000 5860 3167 16060
State 000 000 000 000 000 000 3647 3647
Private 000 000 000 000 000 000 020 020
Central 2070 4046 000 6116 000 9913 000 16029
Sub-Total 2070 4046 000 6116 000 9913 3667 19696
7500 6362 000 13862 000 14376 000 28238
State 000 49771 3600 53371 000 42200 25674 121245
Private 000 2450 000 2450 000 000 2571 5021
Central 52002 125360 000 177362 000 103000 500 280862
Grand Total 52002 177581 3600 233183 000 145200 28745 407128
Central - Unallocated
Total (Eastern
Region)
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
NORTH-EASTERN REGION
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
State Ownership Sector
Modewise breakup
Grand TotalThermalNuclear
Bihar
Jharkhand
West Bengal
DVC
Odisha
Sikkim
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
EASTERN REGION
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
Ownership Sector
Modewise breakup
Grand TotalThermalNuclear
Hydro
(Renewable)
RES
(MNRE)
Manipur
Nagaland
State
Mizoram
Central - Unallocated
Total (North-
Eastern Region)
Hydro
(Renewable)
RES
(MNRE)
Assam
Arunachal Pradesh
Meghalaya
Tripura
File NoCEA-CH-14-1142018-Coordination Division
(As on 31102018)
Coal Gas Diesel Total
State 000 000 4005 4005 000 000 525 4530
Private 000 000 000 000 000 000 146 146
Central 000 000 000 000 000 000 510 510
Sub-Total 000 000 4005 4005 000 000 1181 5186
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 075 075
Central 000 000 000 000 000 000 000 000
Sub-Total 000 000 000 000 000 000 075 075
State 000 000 4005 4005 000 000 525 4530
Private 000 000 000 000 000 000 221 221
Central 000 000 000 000 000 000 510 510
Grand Total 000 000 4005 4005 000 000 1256 5261
19
Andaman amp
Nicobar
lakshadweep
Total (Islands)
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
State Ownership Sector
Modewise breakup
Grand TotalThermalNuclear
Hydro
(Renewable)
RES
(MNRE)
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
ISLANDS
File NoCEA-CH-14-1142018-Coordination Division
SrNo Contents Page
1 Executive summary of Target and Achievement of Transmission Lines during 2018-19
20(1)
2 List of Transmission Lines CommissionedReady for commissioning during Oct-2018 20(2)
Section C - Transmission Lines
File NoCEA-CH-14-1142018-Coordination Division
Executive summary of Target and Achievement of Transmission Lines during 2018-19 As on Oct-18
(All figures in circuit kms)
Centr
al S
ecto
r
Sta
te S
ecto
r
JV
Private
Secto
r
To
tal
Centr
al S
ecto
r
Sta
te S
ecto
r
JV
Private
Secto
r
To
tal
Centr
al S
ecto
r
Sta
te S
ecto
r
JV
Private
Secto
r
To
tal
Centr
al S
ecto
r
Sta
te S
ecto
r
JV
Private
Secto
r
To
tal
Centr
al S
ecto
r
Sta
te S
ecto
r
JV
Private
Secto
r
To
tal
Cen
tral S
ecto
r
Sta
te S
ecto
r
JV
Pri
vate
Secto
r
Gra
nd
To
tal
0 0 0 0 0 0 0 0 4692 766 827 6285 3045 5906 980 9931 553 5878 0 6431 8290 12550 1807 22647
Oct18 Programme 0 0 0 0 0 0 0 0 300 0 0 300 662 90 562 1314 0 723 0 723 962 813 562 2337
Achievement 0 0 0 0 0 0 0 0 729 0 0 729 471 266 0 737 0 401 0 401 1200 667 0 1867
Upto Oct-18 Programme 0 0 0 0 0 0 0 0 3004 416 0 3420 1350 3109 562 5021 481 4346 0 4827 4835 7871 562 13268
Achievement 0 0 0 0 0 0 0 0 2286 0 178 2464 1436 1783 1595 4814 60 4461 0 4521 3782 6244 1773 11799
20(1)
220 kV Grand Total 800 kV 500 kV
Programme 2018-19
Programme
Achievement
HVDC765 kV 400 kV
File NoCEA-CH-14-1142018-Coordination Division
SlNo Line
Length
(cKM)
1 2 3 4 5 6
1 765 Jharsuguda - Dharamjaygarh line DC PGCIL 296
2 765LILO of Kurnool - Thirvualam line at
CuddapahDC PGCIL 190
3 765 Salem PS - Madhugiri PS line SC PGCIL 243
4 400 Cuddapah - Hindupur line (Q) DC PGCIL 338
5 400LILO of Both Ckt of Bamnauli - Samaypur at
TughlakabadMC PGCIL 114
6 400LILO-Out of Cuddapah - Hindupur line (Q)
(Both Ckts) at NP Kunta ssDC PGCIL 19
1200
7 400LILO of Sterlite - Meramundali at Lapanga
4oo kV ssDC OPTCL 14
8 400 Sterlite - Lapanga line DC OPTCL 37
9 400 TMDC Podili - Sattapenalli line DC APTRANSCO 215
10 230Neyveli 230110 kV ss - Eachangadu
230kV FeederSC TANTRANSCO 1
11 230 NNTPS - Neyveli 230110kV ss DC TANTRANSCO 2
12 220 Ajmer (400 kV) - Bherunda (TK) DC RVPNL 100
13 220 Aligarh - Atrauli line DC UPPTCL 77
14 220 Khandwa - Chhanera line DC MPPTCL 78
15 220LILO of one Ckt of Hadala - Sartanpar line
at Wankaner on MC towersDC GETCO 6
16 220 LILO of one Ckt of Vita - Miraj at Alkud ss DC MSETCL 27
17 220 Mendhigiri - Alkud ss DC MSETCL 110
667
1867
20(2)
Grand Total
2Transmission Lines (220 kV and above) CommissionedReady for commissioning During Oct-2018
As on 31-10-18
Voltage
Level (kV)Name of Transmission Lines
Circuit
Type
Executing
Agency
CENTRAL SECTOR
Total of CENTRAL SECTOR
STATE SECTOR Sector
Total of STATE SECTOR
File NoCEA-CH-14-1142018-Coordination Division
SN Contents Page
1 Executive summary of Target and Achievement of Substations during 2018-19 21(1)
2Sub Stations (220 kV and above) commissionedready for commisssioning during Oct-
201821(2)
Section D - Sub Stations
File NoCEA-CH-14-1142018-Coordination Division
1 Executive summary of Target and Achievement of Substations during 2018-19 As on Oct-18
(All figures in circuit MVA)
Centr
al S
ecto
r
Sta
te S
ecto
r
JV
Private
Secto
r
To
tal
Centr
al S
ecto
r
Sta
te S
ecto
r
JV
Private
Secto
r
To
tal
Centr
al S
ecto
r
Sta
te S
ecto
r
JV
Private
Secto
r
To
tal
Centr
al S
ecto
r
Sta
te S
ecto
r
JV
Private
Secto
r
To
tal
Centr
al S
ecto
r
Sta
te S
ecto
r
JV
Private
Secto
r
To
tal
Cen
tral S
ecto
r
Sta
te S
ecto
r
JV
Pri
vate
Secto
r
Gra
nd
To
tal
3000 0 0 3000 0 0 0 0 22200 0 0 22200 8185 13085 630 21900 740 14760 0 15500 34125 27845 630 62600
Oct18 Programme 0 0 0 0 0 0 0 0 0 0 0 0 1000 1260 630 2890 0 1400 0 1400 1000 2660 630 4290
Achievement 0 0 0 0 0 0 0 0 3000 0 0 3000 1500 3120 0 4620 0 2220 0 2220 4500 5340 0 9840
Upto Oct-18 Programme 0 0 0 0 0 0 0 0 10000 0 0 10000 6130 7435 630 14195 0 9670 0 9670 16130 17105 630 33865
Achievement 0 0 0 0 0 0 0 0 14000 0 0 14000 9000 7550 630 17180 0 10610 0 10610 23000 18160 630 41790
21(1)
220 kV Grand Total 800 kV 500 kV
Programme 2018-19
Programme
Achievement
HVDC765 kV 400 kV
File NoCEA-CH-14-1142018-Coordination Division
As on 31-10-18
Sl Voltage Ratio Capacity
No (kVkV) (MWMVA)
1 2 3 4 5
1 Cuddapah Ss 765400 PGCIL 3000
2 Tughlakabad SS (GIS) 400220 PGCIL 1500
Total of CENTRAL SECTOR 4500
3 Panki Kanpur (Aug) TF-I 400200 UPPTCL 75
4 Hindupur ss (1st ICT) 400220 APTRANSCO 315
5 Thappagundu ss 400110 TANTRANSCO 600
6 Mendhasal (2nd power TF) 400220 OPTCL 20
7 Jodhpur ss (New) 400220 RVPNL 315
8 Shankarpally 400220 TSTRANSCO 500
9 Podili ss (1st ICT) 400220 APTRANSCO 315
10 Doni (Gadag)SS 400220 KPTCL 1000
11 Porur (Addl TF) 230110 TANTRANSCO 100
12 Anuppankulam (Addl TF) 230110 TANTRANSCO 60
13 Neyveli SS 230110 TANTRANSCO 480
14 Savarkundla (Aug) 22066 GETCO 60
15 Bhuna (Aug) 220132 HVPNL 100
16 Madanpur (Aug) 22066 HVPNL 100
17 Gurgaon Sec-52A (Aug) 22066 HVPNL 160
18 IA Hisar (Aug) 220132 HVPNL 50
19 Narwana (Aug) 220132 HVPNL 60
20 Therubali (3rd Auto TF) 220132 OPTCL 160
21 Halasar ss 220132 RVPNL 160
22 Bansi Siddaharthnagar (Aug) TF-I 220132 UPPTCL 60
23 Hata Kushinagar (New) TF-I 220132 UPPTCL 100
24 Gomti nagar Lucknow (Aug) TF-IV 22033 UPPTCL 60
25 Kanpur Road Lucknow (New) TF-III 22033 UPPTCL 60
26 Asoj (Aug) 22066 GETCO 150
27 Kangasiyali (Aug) 22066 GETCO 60
28 Karmsad (Aug) 22066 GETCO 160
29 Lalpar (Aug) 22066 GETCO 60
TOTAL STATE SECTOR 5340
GRAND TOTAL 9840
21(2)
PRIVATE SECTOR
CENTRAL SECTOR
STATE SECTOR
2Sub-Stations (220 kV and above) CommissionedReady for commissioning During Oct-2018
Name of Sub StationsExecuting
Agency
File NoCEA-CH-14-1142018-Coordination Division
SN Contents Page
1 Electricity Generation (MU) Targets and Achievements for 2018-19 22
Section E - Electricity Generation
File NoCEA-CH-14-1142018-Coordination Division
Programme Achievement Ach Programme Achievement Ach
Central Sector 35160700 3028100 3162321 10443 20144400 21150469 10499
State Sector 35132000 3010000 3017260 10024 19922100 19549030 9813
PvtIPP Sector 36999700 3240600 3375603 10417 21598300 20794155 9628
PvtUTL Sector 1857600 164500 180597 10979 1130900 1203107 10638
Total 109150000 9443200 9735781 10310 62795700 62696761 9984
Central Sector 5617600 420900 451004 10715 4193000 4045436 9648
State Sector 6110600 559500 708469 12663 4049400 4433000 10947
PvtIPP Sector 1141800 80500 90122 11195 976400 1021963 10467
PvtUTL Sector 130000 11300 12564 11119 76700 99943 13030
Total 13000000 1072200 1262159 11772 9295500 9600342 10328
Central Sector 3850000 353300 303310 8585 2068900 2203540 10651
Total 3850000 353300 303310 8585 2068900 2203540 10651
Bhutan Import 500000 63300 35395 5592 347000 416660 12007
Central Sector 44628300 3802300 3916635 10301 26406300 27399445 10376
State Sector 41242600 3569500 3725729 10438 23971500 23982030 10004
Pvt Sector 40129100 3496900 3658886 10463 23782300 23119168 9721
Total 126500000 10932000 11336645 10370 74507100 74917303 10055
Provisional based on actual-cum-Assesment
Figs in MU
Cummulative
Achievement
Cummulative
Achievement
Sep-18 Sep-17 Upto Sep-2018 Upto Sep-2017
1073794 748889 7332680 5660929
22
Renewable Energy Generation
Achievement
Oct-2018
1 Electricity Generation (MU) Targets and Achievememts for 2018-19
All India Energy Generation During April 2018- Oct 2018 (MU)
Target (2018-19)April 2018- Oct 2018
Sector
Hydro
Thermal
Nuclear
627957
92955
20689
745071
626968
96003
22035
749173
0
100000
200000
300000
400000
500000
600000
700000
800000
Thermal Hydro Nuclear Total
Programme
Achievement
File NoCEA-CH-14-1142018-Coordination Division
SN Contents Page
1 Energy Power Supply Position (Provisional) for Oct-2018 and during April 2018- Oct 2018 23
2 Peak Power Supply Position (Provisional) for Oct-2018 and during April 2018- Oct 2018 24
3 Energy Power Supply Position (Revised) for Sep-2018 and during April 2018- Sept 2018 25
4 Peak Power Supply Position (Revised) for Sep-2018 and during April 2018- Sept 2018 26
5 Notified Power cuts Restrictions on Industries during Oct-2018 27
6 Power Supply to Agricultural Sector during Oct-2018 28
Section F - Power supply position
File NoCEA-CH-14-1142018-Coordination Division
आकड़ मममलयन यननट नट Figures in MU net
ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied
कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )
चडीगढ़ Chandigarh 108 108 0 00 1055 1055 0 00
दिलली Delhi 2490 2489 1 00 22524 22510 14 01
हरियजणज Haryana 4554 4554 0 00 35205 35205 0 00
दहमजचल परिश Himachal Pradesh 788 787 2 02 5728 5560 168 29
रमम कशमीि Jammu amp Kashmir 1497 1219 278 186 10982 8865 2117 193
परजब Punjab 4418 4418 0 00 38832 38819 13 00
िजरसथजन Rajasthan 6748 6748 0 00 45341 45181 160 04
उतति परिश Uttar Pradesh 10136 9973 164 16 75485 74808 676 09
उततिजखड Uttarakhand 1083 1081 3 03 8395 8310 85 10
उततरी कषतर Northern Region 31822 31375 447 14 243547 240314 3233 13
छततीसगढ़ Chhattisgarh 2454 2453 1 00 16119 16091 28 02
गरिजत Gujarat 11636 11636 0 00 70782 70768 14 00
मधय परिश Madhya Pradesh 5860 5859 1 00 38412 38410 2 00
महजिजषटर Maharashtra 15223 15095 128 08 95489 95355 134 01
िमन औि दिउ Daman amp Diu 216 216 0 00 1523 1523 0 00
िजिि व नगि हवली Dadra amp Nagar Haveli 553 553 0 00 3757 3757 0 00
गोवज Goa 366 366 0 00 2497 2495 2 01
पशचिमी कषतर Western Region 36308 36178 130 04 228579 228398 180 01
आनधर परिश Andhra Pradesh 5860 5854 6 01 37377 37334 43 01
तलगजनज Telangana 6748 6742 6 01 38251 38205 46 01
कनजाटक Karnataka 5842 5835 7 01 39111 39059 52 01
किल Kerala 2116 2096 20 09 14256 14160 96 07
तममल नजड Tamil Nadu 8611 8601 10 01 65742 65666 76 01
पडचिी Puducherry 216 215 1 05 1654 1646 8 05
लकष-दवीप Lakshadweep 4 4 0 0 27 27 0 0
दकषकषणी कषतर Southern Region 29392 29342 50 02 196390 196069 321 02
बबहजि Bihar 2742 2738 4 01 19143 18951 192 10
िजमोिि घजटी ननगम DVC 1712 1698 13 08 13096 12828 268 20
झजिखणड Jharkhand 701 697 4 06 5022 4949 73 15
ओडडशज Odisha 3147 3134 13 04 20224 20192 32 02
पशशचम बगजल West Bengal 4204 4200 4 01 33008 32881 127 04
मसशककम Sikkim 40 40 0 00 279 279 0 01
अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 67 202 188 13 67
परवी कषतर Eastern Region 12547 12507 40 03 90772 90080 692 08
अरणजचल परिश Arunachal Pradesh 67 66 1 09 502 496 7 13
असम Assam 833 809 24 29 6153 5903 250 41
मणणपि Manipur 72 71 1 10 485 478 7 14
मघजलय Meghalaya 147 147 0 00 1043 1042 0 00
ममज़ोिम Mizoram 63 62 1 08 365 359 5 14
नजगजलड Nagaland 76 67 8 110 540 481 59 109
बिपिज Tripura 130 129 1 09 1025 1007 19 18
उततर-परवी कषतर North-Eastern Region 1387 1351 35 25 10113 9766 346 34
समपणण भारत All India 111455 110753 702 06 769399 764627 4773 06
23
ऊराण वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Energy Power Supply Position Report (Provisional)
राजयStateअकरबर2018 October2018 अपरल2018 -अकरबर2018 April2018 to October2018
ऊरजा पनत ा म कमी ऊरजा पनत ा म कमीEnergy not Supplied
Excludes energy exported to Bangladesh
Energy not Supplied
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
File NoCEA-CH-14-1142018-Coordination Division
अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met
कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )
चडीगढ़ Chandigarh 217 217 0 00 369 369 0 00
दिलली Delhi 4713 4713 0 00 7016 7016 0 00
हरियजणज Haryana 7948 7948 0 00 10270 10270 0 00
दहमजचल परिश Himachal Pradesh 1520 1520 0 00 1520 1520 0 00
रमम कशमीि Jammu amp Kashmir 2836 2269 567 200 2951 2361 590 200
परजब Punjab 7979 7979 0 00 12638 12638 0 00
िजरसथजन Rajasthan 11450 11450 0 00 11698 11698 0 00
उतति परिश Uttar Pradesh 17434 16745 688 39 20498 20062 436 21
उततिजखड Uttarakhand 1943 1943 0 00 2143 2143 0 00
उततरी कषतर Northern Region 50659 49635 1024 20 63166 61726 1440 23
छततीसगढ़ Chhattisgarh 4414 4268 146 33 4414 4268 146 33
गरिजत Gujarat 18148 18130 19 01 18148 18130 19 01
मधय परिश Madhya Pradesh 11356 11317 39 03 11356 11317 39 03
महजिजषटर Maharashtra 23864 23159 705 30 23864 23254 610 26
िमन औि दिउ Daman amp Diu 342 341 1 02 357 356 1 02
िजिि व नगि हवली Dadra amp Nagar Haveli 784 780 4 05 816 815 1 01
गोवज Goa 536 536 0 00 596 596 0 00
पशचिमी कषतर Western Region 56548 55695 853 15 56548 55695 853 15
आनधर परिश Andhra Pradesh 9435 9435 0 00 9435 9435 0 00
तलगजनज Telangana 10603 10603 0 00 10815 10815 0 00
कनजाटक Karnataka 10741 10741 0 00 10741 10741 0 00
किल Kerala 3727 3644 83 22 4050 3997 53 13
तममल नजड Tamil Nadu 14747 14333 414 28 15029 14981 47 03
पडचिी Puducherry 363 362 1 03 420 400 19 46
लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0
दकषकषणी कषतर Southern Region 45279 45226 53 01 45946 45684 262 06
बबहजि Bihar 4945 4945 0 00 5050 5045 5 01
िजमोिि घजटी ननगम DVC 2729 2729 0 00 2874 2874 0 00
झजिखणड Jharkhand 1260 1260 0 00 1339 1284 55 41
ओडडशज Odisha 5624 5224 400 71 5624 5357 268 48
पशशचम बगजल West Bengal 8775 8775 0 00 9130 9123 7 01
मसशककम Sikkim 86 86 0 00 90 90 0 00
अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7
परवी कषतर Eastern Region 22959 22567 392 17 22959 22567 392 17
अरणजचल परिश Arunachal Pradesh 138 125 13 94 138 133 5 37
असम Assam 1785 1704 81 45 1865 1809 56 30
मणणपि Manipur 187 185 2 11 193 186 7 36
मघजलय Meghalaya 336 336 0 00 371 368 2 07
ममज़ोिम Mizoram 99 97 2 20 103 98 4 41
नजगजलड Nagaland 134 131 3 22 156 138 18 117
बिपिज Tripura 269 269 0 00 298 293 5 17
उततर-परवी कषतर North-Eastern Region 2790 2700 90 32 2967 2850 117 39
समपणण भारत All India 172945 170604 2341 14 177022 175528 1494 08
24
अधिकतम वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Peak Power Supply Position Report (Provisional)
आकड़ मगज वजट नट Figures in MW netअपरल2018 -अकरबर2018 April2018 to October2018
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
मजग की पनता म कमी Demand not Met
Excludes the supply to Bangladesh
राजयStateअकरबर2018 October2018
मजग की पनता म कमी Demand not Met
File NoCEA-CH-14-1142018-Coordination Division
आकड़ मममलयन यननट नट Figures in MU net
ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied
कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )
चडीगढ़ Chandigarh 141 141 0 00 947 947 0 00
दिलली Delhi 2925 2924 1 00 20034 20021 13 01
हरियजणज Haryana 4794 4794 0 00 30651 30651 0 00
दहमजचल परिश Himachal Pradesh 876 853 24 27 4940 4773 167 34
रमम कशमीि Jammu amp Kashmir 1520 1246 274 180 9485 7646 1839 194
परजब Punjab 5575 5575 0 00 34414 34401 13 00
िजरसथजन Rajasthan 6202 6201 0 00 38594 38434 160 04
उतति परिश Uttar Pradesh 10211 10124 86 08 65349 64836 513 08
उततिजखड Uttarakhand 1162 1149 13 11 7311 7229 82 11
उततरी कषतर Northern Region 33405 33008 398 12 211725 208939 2786 13
छततीसगढ़ Chhattisgarh 2403 2388 15 06 13665 13638 27 02
गरिजत Gujarat 10122 10122 0 00 59146 59132 14 00
मधय परिश Madhya Pradesh 5492 5491 1 00 32552 32551 1 00
महजिजषटर Maharashtra 13615 13612 3 00 80266 80260 6 00
िमन औि दिउ Daman amp Diu 221 221 0 00 1306 1306 0 00
िजिि व नगि हवली Dadra amp Nagar Haveli 551 551 0 00 3204 3204 0 00
गोवज Goa 339 339 0 00 2131 2128 2 01
पशचिमी कषतर Western Region 32742 32723 19 01 192270 192220 50 00
आनधर परिश Andhra Pradesh 5294 5287 7 01 31518 31480 37 01
तलगजनज Telangana 6279 6272 8 01 31503 31463 40 01
कनजाटक Karnataka 5701 5693 8 01 33269 33225 45 01
किल Kerala 2050 2026 24 12 12140 12063 76 06
तममल नजड Tamil Nadu 8971 8959 12 01 57131 57065 66 01
पडचिी Puducherry 226 224 2 08 1438 1431 7 05
लकष-दवीप Lakshadweep 4 4 0 0 23 23 0 0
दकषकषणी कषतर Southern Region 28520 28460 60 02 166998 166727 271 02
बबहजि Bihar 2839 2793 46 16 16400 16213 188 11
िजमोिि घजटी ननगम DVC 1901 1750 151 79 11384 11130 254 22
झजिखणड Jharkhand 740 723 17 22 4321 4252 69 16
ओडडशज Odisha 2921 2918 3 01 17077 17058 19 01
पशशचम बगजल West Bengal 4902 4879 23 05 28804 28681 123 04
मसशककम Sikkim 39 39 0 01 239 239 0 01
अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 67 173 162 12 67
परवी कषतर Eastern Region 13341 13102 240 18 78225 77573 652 08
अरणजचल परिश Arunachal Pradesh 74 73 1 10 435 429 6 14
असम Assam 950 914 36 38 5320 5094 226 43
मणणपि Manipur 70 69 1 11 414 408 6 15
मघजलय Meghalaya 150 150 0 01 896 896 0 01
ममज़ोिम Mizoram 58 57 1 12 302 297 5 16
नजगजलड Nagaland 80 72 8 104 464 414 50 108
बिपिज Tripura 192 191 1 07 895 878 17 19
उततर-परवी कषतर North-Eastern Region 1575 1527 48 31 8726 8415 311 36
समपणण भारत All India 109584 108819 765 07 657944 653873 4071 06
Energy not Supplied Energy not Supplied
ससतबर2018 September2018 अपरल2018 -ससतबर2018 April2018 to September2018
ऊरजा पनत ा म कमी ऊरजा पनत ा म कमी
Excludes energy exported to Bangladesh
राजयState
ऊराण वरवदयत आपरतण शथिरत ररपोरण (सशोधित) Energy Power Supply Position Report (Revised)
25
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
File NoCEA-CH-14-1142018-Coordination Division
अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met
कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )
चडीगढ़ Chandigarh 293 293 0 00 369 369 0 00
दिलली Delhi 5358 5358 0 00 7016 7016 0 00
हरियजणज Haryana 9008 9008 0 00 10270 10270 0 00
दहमजचल परिश Himachal Pradesh 1466 1466 0 00 1479 1479 0 00
रमम कशमीि Jammu amp Kashmir 2951 2361 590 200 2951 2361 590 200
परजब Punjab 11405 11405 0 00 12638 12638 0 00
िजरसथजन Rajasthan 10612 10612 0 00 11698 11698 0 00
उतति परिश Uttar Pradesh 18346 18121 225 12 20498 20062 436 21
उततिजखड Uttarakhand 1996 1996 0 00 2143 2143 0 00
उततरी कषतर Northern Region 56407 55649 758 13 63166 61726 1440 23
छततीसगढ़ Chhattisgarh 4404 4075 328 75 4404 4136 268 61
गरिजत Gujarat 16963 16963 0 00 17053 16963 90 05
मधय परिश Madhya Pradesh 8811 8771 41 05 8811 8775 36 04
महजिजषटर Maharashtra 22455 22349 106 05 23395 23254 141 06
िमन औि दिउ Daman amp Diu 357 356 1 02 357 356 1 02
िजिि व नगि हवली Dadra amp Nagar Haveli 816 815 1 01 816 815 1 01
गोवज Goa 596 596 0 00 596 596 0 00
पशचिमी कषतर Western Region 52933 52895 38 01 53841 52895 945 18
आनधर परिश Andhra Pradesh 9435 9416 19 02 9435 9416 19 02
तलगजनज Telangana 10815 10815 0 00 10815 10815 0 00
कनजाटक Karnataka 10103 10090 13 01 10690 10688 2 00
किल Kerala 3888 3638 251 64 4050 3997 53 13
तममल नजड Tamil Nadu 14556 14553 3 00 15029 14981 47 03
पडचिी Puducherry 390 372 17 45 420 400 19 46
लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0
दकषकषणी कषतर Southern Region 45542 45428 114 02 45946 45684 262 06
बबहजि Bihar 5050 5045 5 01 5050 5045 5 01
िजमोिि घजटी ननगम DVC 2641 2641 0 00 2874 2874 0 00
झजिखणड Jharkhand 1233 1233 0 00 1339 1284 55 41
ओडडशज Odisha 4906 4906 0 00 5357 5357 0 00
पशशचम बगजल West Bengal 8644 8639 5 01 9130 9123 7 01
मसशककम Sikkim 78 78 0 00 90 90 0 00
अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7
परवी कषतर Eastern Region 22110 22100 10 00 22470 22290 180 08
अरणजचल परिश Arunachal Pradesh 132 130 2 15 138 133 5 37
असम Assam 1865 1809 56 30 1865 1809 56 30
मणणपि Manipur 184 182 2 13 193 186 7 36
मघजलय Meghalaya 317 317 0 00 371 368 2 07
ममज़ोिम Mizoram 95 93 2 23 103 98 4 41
नजगजलड Nagaland 142 138 5 32 156 138 18 117
बिपिज Tripura 296 293 3 10 298 293 5 17
उततर-परवी कषतर North-Eastern Region 2921 2850 71 24 2967 2850 117 39
समपणण भारत All India 177022 175528 1494 08 177022 175528 1494 08
26
मजग की पनता म कमी मजग की पनता म कमी Demand not MetDemand not Met
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
Excludes the supply to Bangladesh
अधिकतम वरवदयत आपरतण शथिरत ररपोरण (सशोधित) Peak Power Supply Position Report (Revised)
आकड़ मगज वजट नट Figures in MW net
राजयStateससतबर2018 September2018 अपरल2018 -ससतबर2018 April2018 to September2018
File NoCEA-CH-14-1142018-Coordination Division
अकरबर2018 October2018अपरल2018 -अकरबर2018 April2018 to October2018
उततरी कषतर Northern Region
चडीगढ़ Chandigarh Data not received Data not received
दिलली Delhi
हरियजणज Haryana
दहमजचल परिश Himachal Pradesh
रमम कशमीि Jammu amp Kashmir Data not received Data not received
परजब Punjab
िजरसथजन Rajasthanउतति परिश Uttar Pradesh
उततिजखड Uttarakhand
पशचिमी कषतर Western Region
छततीसगढ़ Chhattisgarh
गरिजत Gujarat
मधय परिश Madhya Pradesh
महजिजषटर Maharashtra
गोवज Goa
दकषकषणी कषतर Southern Region
आनधर परिश Andhra Pradesh
तलगजनज Telangana
कनजाटक Karnataka
किल Kerala
तममल नजड Tamil Nadu
पडचिी Puducherryपरवी कषतर Eastern Region
बबहजि Bihar
झजिखणड Jharkhand
ओडडशज Odisha
पशशचम बगजल West Bengal
N
o No
tified
Cuts
N
o No
tified
Cuts
27
अकरबर 2018 म इडथरीर पर वरवदयत करौती का वरवरवरण Notified Power CutsRestrictions on Industries during October2018
राजय कषतर State Regionऊराणमाग करौती EnergyDemand Cut
No Notified Cuts No Notified Cuts
File NoCEA-CH-14-1142018-Coordination Division
अकरबर2018 October2018अपरल2018 -अकरबर2018 April2018 to October2018
उततरी कषतर Northern Region
चडीगढ़ Chandigarh Data not received Data not received
दिलली Delhi Data not received Data not received
हरियजणज Haryana 940 hrsday 0709 - 0950 hrsday
दहमजचल परिश Himachal Pradesh No cut imposed on agriculture consumers and uninterrupted
power is being supplied to agriculture sector
HPSEBL has only 2 agriculture consumers and uninterrupted
power is being supplied to agriculture sector
रमम कशमीि Jammu amp Kashmir Data not received Data not received
परजब Punjab 0507 hrsday 0349 - 0844 hrsday
िजरसथजन Rajasthan 0630 hrsday 0630 hrsday
उतति परिश Uttar Pradesh 1825 hrsday 1814 - 1858 hrsday
उततिजखड Uttarakhand 2350 hrsday 2128 - 2357 hrsday
पशचिमी कषतर Western Region
छततीसगढ़ Chhattisgarh 18hoursday 18 hrsday
गरिजत Gujarat 805 hrsday 805 hrsday
मधय परिश Madhya Pradesh Three-Phase Supply(Irrigation)-947 hrs day
Three-Phase (Mixed) Supply - 2311 hrs day
Three-Phase Supply(Irrigation)- 0933 - 0947 hrs day Three-
Phase (Mixed) Supply - 2300 - 2320 hrs day
महजिजषटर Maharashtra Three-Phase Supply(Irrigation)- 9 hrs day
Three-Phase (Mixed) Supply - 24 hrs day
Three-Phase Supply(Irrigation)- 9 hrs day
Three-Phase (Mixed) Supply - 24 hrs day
गोवज Goa No restriction No restriction
दकषकषणी कषतर Southern Region
आनधर परिश Andhra Pradesh 07 hrsday 07 hrsday
तलगजनज Telangana 24 hoursday 24 hoursday
कनजाटक Karnataka 6 hrsday 6 hrsday
किल Kerala No Restrictions No Restrictions
तममल नजड Tamil Nadu 9 hrsday (6 hrs during day time and 3 hrs during night time) 9 hrsday (6 hrs during day time and 3 hrs during night time)
पडचिी Puducherry No Restrictions No Restrictions
परवी कषतर Eastern Region
बबहजि Bihar About 18 hrsday About 18 hrsday
झजिखणड Jharkhand About 20 hrsday About 20 hrsday
ओडडशज Odisha 24 hrsday 24 hrsday
पशशचम बगजल West Bengal About 23 hrsday About 23 hrsday
28
अकटबर 2018 कषि कषतर को षिदयत आपरति का षििरण Power Supply to Agricultural Sector during October2018
राजय कषतर State Regionऔसत वरवदयत आपरतण घनरो म Average Hours of Supply
On segregated feeders
File NoCEA-CH-14-1142018-Coordination Division
SNo Contents Page
1 Growth of Installed Capacity since 6th Plan 29
2 Progress of Transmission Sector since 6th Plan 30
3 All India Yearly Coal consumption for Power Generation (Utilities)
4 All India Annual Per Capita Consumption of Electricity since -2006
5 Average cost of power supply amp Average realisation (Paisakwh)
6 Growth of Rural Electrification amp Pump Sets Energisation
7 Status of Hydro Schemes Cleared by the CEA in Oct-2018
Section G - Growth of Power Sector
31
32
File NoCEA-CH-14-1142018-Coordination Division
(In MW)
Coal Gas Diesel Total
End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472
End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634
End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537
End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596
End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921
End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703
End of 12th Plan 19216288 2532938 83763 21832988 6780 4447842 50018 31960630
Up to Oct-2018 19599250 2493722 837629 22176734 6780 4548742 7201281 34604757
Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-17) = 51529 MW
Electricity Generation (MU) Targets and Achievements for 2016-17
Coal Gas Diesel Nuclear Hydro Res Total
1959925 2493722 837629 678000 454874 72012805 22925174
29
1 Growth of Installed Capacity Since 6th Plan
Plan YearThermal
Nuclear Hydro RES (MNRE) Total
Total Installed Capacity 34604757 MW
Coal Gas Diesel Nuclear Hydro Res
File NoCEA-CH-14-1142018-Coordination Division
Progress of Transmission Sector in the Country up to Oct 2018
1 TRANSMISSION LINES (All fig in CKM)
At the end of
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
6th plan 0 0 0 0 0 0 0 0 0 0 0 0 1831 4198 0 6029 1641 44364 0 46005 3472 48562 0 52034
7th plan 0 0 0 0 0 0 0 0 0 0 0 0 13068 6756 0 19824 4560 55071 0 59631 17628 61827 0 79455
8th plan 0 0 0 0 1634 0 0 1634 0 0 0 0 23001 13141 0 36142 6564 73036 0 79600 31199 86177 0 117376
9th plan 0 0 0 0 3234 1504 0 4738 751 409 0 1160 29345 20033 0 49378 8687 88306 0 96993 42017 110252 0 152269
10th plan 0 0 0 0 4368 1504 0 5872 1775 409 0 2184 48708 24730 0 73438 9444 105185 0 114629 64295 131828 0 196123
11th Plan 0 0 0 0 5948 1504 1980 9432 4839 411 0 5250 71023 30191 5605 106819 10140 125010 830 135980 91950 157116 8415 257481
12th Plan 6124 0 0 6124 5948 1504 1980 9432 25465 1177 4598 31240 92482 48240 17065 157787 11014 151276 978 163268 141033 202197 24621 367851
13th Plan (Up
to Mar2018)6124 0 0 6124 5948 1504 1980 9432 28666 1512 4881 35059 98247 54286 19067 171600 11258 156497 1000 168755 150243 213799 26928 390970
13th Plan (Up
to Sep-18)6124 0 0 6124 5948 1504 1980 9432 30952 1512 5059 37523 99683 56069 20662 176414 11318 160958 1000 173276 154025 220043 28701 402769
27150
75050
47900
118050
90650
30
IR addition in 12th Plan (up to
March 2017)
Total IR (up to Oct-18)
IR at the end of 11th Plan
IR at the end of 12th Plan
Envisaged IR Capacity at the end
of 13th Plan
Grand Total
Note - The figure upto the end of 10th plan in for stringing progress including the lines not commissioned Now only commissioned lines are reckoned Accordingly the figure for 10th plan (end) may read as 187555 after adjusting with (-) 10852 Ckm
Inter-regional Power Transfer Capacity
plusmn 800 kV HVDC plusmn 500 kV HVDC 765 kV 400 kV 220 kV
File NoCEA-CH-14-1142018-Coordination Division
2004-05 27800
2005-06 28100
2006-07 30200
2007-08 33000
2008-09 35500
2009-10 36700
2010-11 38700
2011-12 41756
2012-13 45460
2013-14 48940
2014-15 53040
2015-16 54590
2016-17 57430
2017-18 60800
Year
2005-06
2006-07
2007-08
2008-09
2009-10
2010-11
2011-12
2012-13
2013-14
2014-15
2015-16
2016-17
2017-18
2004-05 254 209 7568
2005-06 260 221 7636
2006-07 276 227 7423
2007-08 293 239 7727
2008-09 340 263 8713
2009-10 355 268 8870
2010-11 398 303 11975
2011-12 455 330 13514
2012-13 501 376 14867
2013-14 518 175
2014-15 520
6719
7171
3 All India yearly Coal Consumption for Power Generation (Utilities)
YEARCoal Consumption
Million Tonnes
4 All India Annual per Capita consumption of Electricity Since 2006
Per Capita Consumption ( kWh)
6314
(GrossGen+ Net Import) Mid-year population
5 Average cost of power supply amp average realization ( paiseKWH )
Yearcost of supply
(paiseunit)
Realization(paiseunit)
Including AgricultureOnly
Agriculture
1149
7335
7786
91441
8188
88363
957
1010
1075
1122
File NoCEA-CH-14-1142018-Coordination Division
Source- PFC Reports on the performance of State Power Utilities 31
File NoCEA-CH-14-1142018-Coordination Division
Sl
NoExecuting Agency
Installed
Capacity (MW)Cost (Rs crore)
Date of
Clearance
32
No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification
since 2004-05
65291374575 296361511th Plan
Cumu upto End of 11th Plan
596556 21212860
557439Cummulative up to end of 12th Plan
46708
18423975
499150
2003-042004-05
5743
9769
Cumu upto End of 10th Plan
010407 to 310308
010410 to 310311557976840909
010411 to 310312
412667
86293726
3207
482864
12632
1576036
4451722594
15455554
2314176
397343611750
2093311060316074
65109527813884
6 Growth Of Rural Electrification amp Pumpsets Energisation
Plan Year
9th Plan2002-03
134092626
4111
Pump Sets Energised Villages Electricfied (Nos)
2001-02
284064367244
1218
27801997-981998-991999-002000-01
297594
010408 to 310309010409 to 310310
10th Plan
2005-062006-07
322968331020
Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as
Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received
from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made
available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified
villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is
independent of the earlier published reports
No Hydro Electric Project has been issued concurrenceAppraisal letter by CEA during October 2018
7 Status of Hydro Schemes Cleared by the CEA in Oct-2018
Name of Scheme
File NoCEA-CH-14-1142018-Coordination Division
SN Contents Page
1 Rate of sale of power for the year 2016-17 33-41
RATE OF SALE OF POWER FOR THE YEAR 2016-17
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) NORTHERN REGION
CENTRAL SECTOR
BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 18000 66900 19800
CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 54000 222400 21600
CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 30000 144400 19600
CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 23100 91700 42600
PARBATI - III HPS NHPC LTD HYDRO-HYDRO 52000 68200 54800
DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 28000 95600 30000
CHUTAK NHPC LTD HYDRO-HYDRO 4400 22000 79800
DULHASTI HPS NHPC LTD HYDRO-HYDRO 39000 228000 56400
SALAL HPS NHPC LTD HYDRO-HYDRO 69000 342300 11000
TANAKPUR HPS NHPC LTD HYDRO-HYDRO 9420 43000 29600
URI HPS -I NHPC LTD HYDRO-HYDRO 48000 280300 16000
URI HPS - II NHPC LTD HYDRO-HYDRO 24000 147300 48600
NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 4500 24600 88200
SEWA - II NHPC LTD HYDRO-HYDRO 12000 47100 43400
ANTA CCPP NTPC LTD THERMAL-GASN 41930 67539 32400
AURAIYA CCPP NTPC LTD THERMAL-GASN 66336 53501 39100
BADARPUR TPS NTPC LTD THERMAL-COAL 70500 159153 44800
DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 84000 296170 42300
DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 98000 526686 46300
DADRI CCPP NTPC LTD THERMAL-GASHSD 82978 227469 33000
FARIDABAD CCPP NTPC LTD THERMAL-GASN 43159 115577 30800
RIHAND STPS I NTPC LTD THERMAL-COAL 100000 596766 24500
RIHAND STPS II NTPC LTD THERMAL-COAL 100000 737069 24600
RIHAND STPS III NTPC LTD THERMAL-COAL 100000 706546 30600
SINGRAULI STPS NTPC LTD THERMAL-COAL 200000 1394068 20400
TANDA TPS NTPC LTD THERMAL-COAL 44000 295438 40800
UNCHAHAR TPS I NTPC LTD THERMAL-COAL 42000 256454 39800
UNCHAHAR TPS II NTPC LTD THERMAL-COAL 42000 273577 38900
UNCHAHAR TPS III NTPC LTD THERMAL-COAL 21000 142780 43000
KOLDAM NTPC LTD HYDRO-HYDRO 80000 363260 43600
NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 303575 25841
RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 108000 668677 35374
NJHPS SJVNL HYDRO-HYDRO 150000 699496 23820
RAMPUR HPS SJVNL HYDRO-HYDRO 41202 195982 32260
TEHRI HPP THDC HYDRO-HYDRO 100000 272543 51800
KOTESHWAR HEP THDC HYDRO-HYDRO 40000 106244 53400
IGSTPS JHAJJAR ARAVALI P CPL THERMAL-COAL 150000 510429 49490
NEYVELI BARSINGSAR NEYVELI LIG CORP LTD THERMAL-LIG 25000 127520 38040
STATE SECTOR
PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 21000 14222 48200
PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 21000 19205 48400
PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 25000 102257 42600
PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 25000 62107 41800
DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 60000 312213 41000
RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 120000 35767442200
WYC HYDEL STATION HPGCL HYDRO-HYDRO 6240 20365 24900
GIRI POWER HOUSE HPSEB HYDRO-HYDRO 6000 13958 7600
ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 1695 5467 11900
BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 12000 18528 6700
GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 2250 7462 22500
BASSI POWER HOUSE HPSEB HYDRO-HYDRO 6600 29649 7500
BINWA POWER HOUSE HPSEB HYDRO-HYDRO 600 2749 19300
ANNEXURE-I
RATE OF SALE OF POWER FOR THE YEAR 2016-2017
Page 33
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) GAJ POWER HOUSE HPSEB HYDRO-HYDRO 1050 2914 26700
BANER POWER HOUSE HPSEB HYDRO-HYDRO 1200 2864 16200
HOLI POWER HOUSE HPSEB HYDRO-HYDRO 300 616 22500
THIROT POWER HOUSE HPSEB HYDRO-HYDRO 450 1126 22500
KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 1200 3064 22500
LARJI POWER HOUSE HPSEB HYDRO-HYDRO 12600 53677 23700
NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 250 750 31000
CHABA POWER HOUSE HPSEB HYDRO-HYDRO 175 465 23300
RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 150 101 13400
SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 200 000 22500
KILLAR HPSEB HYDRO-HYDRO 030 050 22500
BHABA AUGUMENP H HPSEB HYDRO-HYDRO 450 1276 22500
BS CHAMBA HPSEB HYDRO-HYDRO 045 099 19500
GUMMA HPSEB HYDRO-HYDRO 300 423 22500
GAS TURBINE POWER STATION IPGCL THERMAL-GAS 27000 67233 39300
PPS-I PPCL THERMAL-GAS 33000 175905 38300
PPS-III PPCL THERMAL-GAS 137120 196879 36100
LOWER JHELUM JampKPDD HYDRO-HYDRO 10500 60214 5100
UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 2260 10514 6300
UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 10500 44202 8500
GANDHARBAL JampKPDD HYDRO-HYDRO 1500 8925 4700
KARNAH MPH JampKPDD HYDRO-HYDRO 200 1122 31000
CHENANI I JampKPDD HYDRO-HYDRO 2330 10892 6600
CHENANI II JampKPDD HYDRO-HYDRO 200 1188 9300
CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 750 3634 14200
IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 375 2108 18500
IGO MERCHELLONG JampKPDD HYDRO-HYDRO 300 1572 29700
PAHALGAM MHP JampKPDD HYDRO-HYDRO 450 1713 32900
MARPACHOO JampKPDD HYDRO-HYDRO 075 375 29800
HAFTAL JampKPDD HYDRO-HYDRO 100 483 28700
SANJAK JampKPDD HYDRO-HYDRO 126 441 36000
SEWA-III JampKPDD HYDRO-HYDRO 900 3273 20200
BHADERWAH JampKPDD HYDRO-HYDRO 150 935 8900
BAZGO JampKPDD HYDRO-HYDRO 030 108 33300
SUMOOR JampKPDD HYDRO-HYDRO 010 045 35400
HUNDER JampKPDD HYDRO-HYDRO 040 176 26200
STAKNA JampKPDD HYDRO-HYDRO 400 1933 4100
KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 124000 662879 31360
SURATGARH TPS RRVUNL THERMAL-COAL 150000 402328 41730
CHHABRA TPS 1amp 2 RRVUNL THERMAL-COAL 50000 305946 36700
CHHABRA TPS 3 RRVUNL THERMAL-COAL 25000 151536 36700
CHHABRA TPS 4 RRVUNL THERMAL-COAL 25000 155896 36700
RAMGARH GT POWER PROJECT RRVUNL THERMAL-COAL 22050 43177 41800
RAMGARH GAS T P PROJECT 3 RRVUNL THERMAL-GAS 5000 93615 41800
DHOLPUR C C POWER PROJECT RRVUNL THERMAL-R-LNG 33000 9486 46110
MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 14000 20855 34192
MINI MICRO HYDEL (MMH) P S RRVUNL HYDRO-HYDRO 2385 851 37800
KALISINDH TPP 1 RRVUNL THERMAL-COAL 60000 341543 45000
KALISINDH TPP 2 RRVUNL THERMAL-COAL 60000 211588 45000
KHARA HEP UPJVNL HYDRO-HYDRO 7200 26654 7200
MATATILLA HEP UPJVNL HYDRO-HYDRO 3060 12219 6500
OBRA HEP UPJVNL HYDRO-HYDRO 9900 21517 6300
RIHAND UPJVNL HYDRO-HYDRO 30000 57369 5500
ANPARA A TPS UPRVUNL THERMAL-COAL 63000 317536 27000
ANPARA B TPS UPRVUNL THERMAL-COAL 100000 705605 22700
ANPARA D UPRVUNL THERMAL-COAL 100000 300158 39800
HARDUAGANJ TPS UPRVUNL THERMAL-COAL 16500 45817 49200
HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 50000 304389 46600
OBRA A TPS UPRVUNL THERMAL-COAL 28800 13158 34000
OBRA B TPS UPRVUNL THERMAL-COAL 100000 328124 21900
Page 34
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) PANKI TPS UPRVUNL THERMAL-COAL 21000 66488 50300
PARICHHA TPS UPRVUNL THERMAL-COAL 22000 38762 49400
PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 42000 231931 45600
PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 50000 276722 50400
CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 24000 70845 8290
CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 14400 75366 8390
DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 3375 9595 12080
DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 5100 18701 10520
KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4140 17359 12330
KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 12000 33001 9420
KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 3000 11953 8320
TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 9000 33983 12460
MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 30400 124510 16110
RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 19800 17897 10550
MPUR UTTARAKHAND JVNL HYDRO-HYDRO 930 5121 19200
PATHRI UTTARAKHAND JVNL HYDRO-HYDRO 2040 11636 14200
GALOGI UTTARAKHAND JVNL HYDRO-HYDRO 300 648 12500
PRIVATE SECTOR
MGTPP CLP INDIA PVT LTD THERMAL-COAL 132000 268902 41940
SHRINAGAR HEP ALAKNANDA HPCL HYDRO-HYDRO 33000 127414 48800
GAMA INFRAPROP CCPP GAMA INFRAPROP PVT THERMAL-GAS 22500 52686 47000
PPGCL (BARA) JP POWER VENTURES LTD THERMAL-COAL 198000 448200 38500
MALANA HEP MALANA PCL HYDRO-HYDRO 8600 26354 29792
MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 10000 30369 32580
ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 19200 56347 36079
KASHANG HEP H P PCL HYDRO-HYDRO 19500 5034 29200
BASPA-II HEP HBPCL HYDRO-HYDRO 30000 132769 13600
KARCHAM WANGTOO HEP HBPCL HYDRO-HYDRO 100000 434386 36600
RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 108000 582600 43700
RITHALA COMBI CY POWER PLANT TATA POWER DDL THERMAL-GAS 9480 000 11900
RAJPURA TPS NABHA POWER LTD THERMAL-GAS 140000 901484 39000
TALWANDI SABO POWER LTD TALWANDI SABO POWER LTD THERMAL-COAL 198000 636040 49548
ROJA THERMAL POWER STATION ROJA POWER SCL THERMAL-COAL 120000 727200 43400
KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 34400 63400
BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 36000 62600
MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 38200 60800
UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 37900 61500
KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 42300 58800
LALITPUR PGCL BAJAJ ENERGY PVT LTD THERMAL-COAL 198000 359400 47300
PRAYAGRAJ PGCL PRAYAGRAJ PGCL THERMAL-COAL 132000 448200 38595
KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 132000 783182 33438
WESTERN REGION
CENTRAL SECTOR
INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 100000 325333 23892
OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 52000 141663 34001
GANDHAR CCPP NTPC LTD THERMAL-GAS 65739 221924 28700
KAWAS CCPP NTPC LTD THERMAL-GASN 65620 167929 27000
KORBA I amp II NTPC LTD THERMAL-COAL 210000 1499171 20500
KORBA III NTPC LTD THERMAL-COAL 50000 358746 26600
SIPAT STPS I NTPC LTD THERMAL-COAL 198000 1479902 26800
SIPAT STPS II NTPC LTD THERMAL-COAL 100000 766549 26500
VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 126000 693142 25800
VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 100000 608781 23800
VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 100000 673475 27600
VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 100000 655924 32900
VINDHYACHAL STPS V NTPC LTD THERMAL-COAL 50000 328265 31700
MOUDA I NTPC LTD THERMAL-COAL 100000 343130 44500
MOUDA Ii NTPC LTD THERMAL-COAL 66000 40637 39900
RATNAGIRI GAS amp POWER PVT LTD RGPPL THERMAL-GAS 196708 442485 47000
KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 000 24729
TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 32000 201227 10740
Page 35
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 365122 19069
TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 787444 29324
STATE SECTOR
GSEG-HAZIRA15610 MW GUJARAT S ENEGEN LTD THERMAL-GAS 15610 1805 28200
GSEG-HAZIRA35143 MW GUJARAT S ENEGEN LTD THERMAL-GAS 35130 22276 51300
GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 21978 51800
AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 13929 26100
KORBA TPS EAST CSPGCL THERMAL-COAL 44000 198673 33880
DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 365808 27570
KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 316500 30420
HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 532878 19410
CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 515 58300
MTTPS CHAMPA U-I CSPGCL THERMAL-COAL 50000 220376 39000
MTTPS CHAMPA U-II CSPGCL THERMAL-COAL 50000 23709 10000
SHP GANGREL CSPGCL HYDRO-HYDRO 1000 2350 36790
BANGO HEP CSPGCL HYDRO-HYDRO 12000 14662 8900
MHP KORBA WEST CSPGCL HYDRO-HYDRO 170 859 38190
SIKASAR HEP CSPGCL HYDRO-HYDRO 700 418 26870
DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8843 74500
DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 19446 51500
GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 66388 71600
GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127488 41300
KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 96072 43900
KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 29841 56400
SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 184966 58800
UKAI 1-5 GSECL THERMAL-COAL 85000 204891 46900
UKAI TPS 6 GSECL THERMAL-COAL 50000 284448 48200
WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 271999 58300
WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 82808 44100
KADANA HPS GSECL HYDRO-HYDRO 24200 34433 16800
UKAI HPS GSECL HYDRO-HYDRO 30500 40585 6100
TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 123000 11500
BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 8900 10900
BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 7200 27500
JHINNA HPS MPPGCL HYDRO-HYDRO 2000 9700 18500
RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 44300 3400
GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 17300 4600
SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 4100 16900
MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 14600 27000
PENCH HPS MPPGCL HYDRO-HYDRO 16000 23700 8100
RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 3000 16900
AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 134400 35100
SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 283800 38700
SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 344600 34300
SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 111600 61600
SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 211800 58000
SSTPS PH-I MPPGCL THERMAL-COAL 120000 233100 84300
BHUSAWAL TPS MSPGCL THERMAL-COAL 142000 566258 51100
CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1365682 33700
KHAPERKHEDA MSPGCL THERMAL-COAL 134000 706207 39100
KORADI TPS MSPGCL THERMAL-COAL 62000 443206 42000
NASIK TPS MSPGCL THERMAL-COAL 63000 297275 47000
PARLI TPS MSPGCL THERMAL-COAL 113000 175934 71600
PARAS MSPGCL THERMAL-COAL 50000 267931 38700
URAN CCPP MSPGCL THERMAL-GAS 67200 320330 30600
KOYANA MSPGCL HYDRO-HYDRO 195600 328155 13100
SMALL HYDRO POWER PLANTS MSPGCL HYDRO-HYDRO 45400 93062 30500
BHIRA MSPGCL HYDRO-HYDRO 8000 10046 8400
TILLARI MSPGCL HYDRO-HYDRO 8900 10584 3100
SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 233298 20500
SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 87633 20500
PRIVATE SECTOR
Page 36
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 81282 46750
JNSTPP(JAYPEE NIGRIE) JP POWER VENTURES LTD THERMAL-COAL 132000 726695 29310
MB POWER MB POWER THERMAL-COAL 120000 345632 38310
ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 754922 28671
ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 780761 23495
ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 198000 1263784 32090
ADANI POWER MAHARA ADANI POWER LTD THERMAL-COAL 330000 1666191 34124
AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 170065 36827
SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 252035 45129
ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 458551 36000
ESSAR POWER MP LTD ESSAR POWER MP LTD THERMAL-COAL 60000 243040 28600
VEDANTA LTD (P P -I) VEDANTA LTD THERMAL-GAS 3000 15044 24000
VEDANTA LTD (P P -II) VEDANTA LTD THERMAL-GAS 3000 21293 24000
PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 8234600 24000
165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 5850 64390
145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 68717 40349
SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 132655 28776
SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 144686 38567
MUNDRA UMPPCOASTAL GUJARAT POWER
LTD THERMAL-IMP COAL 400000 2530300
23900
LANCO AMARKANTAK TPP PATHADIH
U-ILANCO AMARKAN POWER LTD THERMAL-COAL 30000 195500
29200
LANCO AMARKANTAK TPP PATHADIH
U-IILANCO AMARKAN POWER LTD THERMAL-COAL 30000 206900
27600
BARADARHA TPS D B POWER LTD THERMAL-COAL 120000 677373 29200
JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 405000 28900
JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 453000 40500
DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 339437 40700
TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 293400 44000
TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 137200 37000
TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 174900 44000
BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 92900 14100
BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23700 34300
KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 27600 48300
CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2530300 23900
BHANDARDRA HEP -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 2475 54900
SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 161400 26500
SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 445000 39000
SOTHERN REGION
CENTRAL SECTOR
NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 325699 54820
NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 305532 39880
NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 998805 38510
NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 113016 54070
NEYVELI TAMILNADU POWER LTD JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 625274 42200
VALLUR TPS NTPC TECL THERMAL-COAL 150000 856438 42350
R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 1493 84300
RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1502919 29400
RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 341291 31800
SIMHADRI I NTPC LTD THERMAL-COAL 100000 688382 36800
SIMHADRI II NTPC LTD THERMAL-COAL 100000 663657 43400
KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 593110 31324
MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 291625 21764
KKNPP-1 amp 2 NPCIL NUCLEAR-NUCLEAR 200000 572609 40948
MINICOY LAKSHADEEP THERMAL-DIESEL 340 770 29600
KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1097 29600
AMINI LAKSHADEEP THERMAL-DIESEL 265 509 29600
ANDROTT LAKSHADEEP THERMAL-DIESEL 219 524 29600
KALPENI LAKSHADEEP THERMAL-DIESEL 175 356 29600
AGATTI LAKSHADEEP THERMAL-DIESEL 195 658 29600
KADMAT LAKSHADEEP THERMAL-DIESEL 190 414 29600
KILTAN LAKSHADEEP THERMAL-DIESEL 150 269 29600
CHETLET LAKSHADEEP THERMAL-DIESEL 100 139 29600
BITRA LAKSHADEEP THERMAL-DIESEL 043 024 29600
BANGARAM LAKSHADEEP THERMAL-DIESEL 018 009 29600
Page 37
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) STATE SECTOR
Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 721811 46500
Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 50000 336142 46500
RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 237358 46500
RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 239926 46500
RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 124500 46500
SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 62109 46500
UPPER SILERU APGENCO HYDRO-HYDRO 24000 33000 46500
LOWER SILERU APGENCO HYDRO-HYDRO 46000 81066 46500
DONKARAI APGENCO HYDRO-HYDRO 2500 6007 46500
PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 1262 46500
CHETTIPETA APGENCO HYDRO-HYDRO 100 214 46500
MUCHKUND APGENCO HYDRO-HYDRO 12000 37571 46500
NAGARJUNASAGAR RCPH APGENCO HYDRO-HYDRO 9000 606 46500
TUNGABHADRA HES amp HAMPI(AP
Share)
APGENCO HYDRO-HYDRO 7200 6100 46500
KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 352232 42600
KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 288131 32500
KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 319272 46500
RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 40073 44300
KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 308317 46000
KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 308963 51300
SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 61004 76600
NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 17960 75300
PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 20873 58300
POCHAMPAD-I TSPGENCO HYDRO-HYDRO 2700 5455 29800
POCHAMPAD-II TSPGENCO HYDRO-HYDRO 900 1932 40700
NIZAMSAGAR TSPGENCO HYDRO-HYDRO 1000 1126 53400
RAICHUR TPS 1 to 7 KPCL THERMAL-COAL 147000 890866 43800
RAICHUR TPS 8 KPCL THERMAL-COAL 25000 159523 48200
BELLARI TPS 1 KPCL THERMAL-COAL 50000 318679 51100
BELLARI TPS 2 KPCL THERMAL-COAL 50000 232347 55600
BELLARI TPS 3 KPCL THERMAL-COAL 70000 47565 34400
BHADRA PH KPCL HYDRO-HYDRO 3920 2369 45900
GERUSUPPA PH KPCL HYDRO-HYDRO 24000 26990 22000
GHAT PRABHA HEP KPCL HYDRO-HYDRO 3200 4777 25300
KADRA HPS KPCL HYDRO-HYDRO 15000 16889 26800
NAGJHARI KPCL HYDRO-HYDRO 90000 155159 9800
KODASALLI DPH KPCL HYDRO-HYDRO 12000 14854 19200
MUNIRA+MGH+SPH+SPH KPCL HYDRO-HYDRO 22640 48211 7900
SHARAVATHY HPS KPCL HYDRO-HYDRO 108550 276215 5400
ALMATTI DPH KPCL HYDRO-HYDRO 29000 39611 24600
VARAHI UGPH KPCL HYDRO-HYDRO 46000 71368 15600
IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 17196 15300
IDUKKI HPS KSEB HYDRO-HYDRO 78000 137905 15300
KAKKAD HPS KSEB HYDRO-HYDRO 5000 13063 15300
KALLADA HPS KSEB HYDRO-HYDRO 1500 4436 15300
KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 46544 15300
KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 635 15300
LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 30822 15300
MALANKARA HPS KSEB HYDRO-HYDRO 1050 2474 15300
MATTUPETTY KSEB HYDRO-HYDRO 200 230 15300
MALAMPUZHA KSEB HYDRO-HYDRO 250 063 15300
CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 864 15300
URUMI ST I amp II KSEB HYDRO-HYDRO 615 903 15300
LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 248 15300
NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7765 19625 15300
PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 16601 15300
PANNIAR HPS KSEB HYDRO-HYDRO 3240 6217 15300
PORINGALKUTHU KSEB HYDRO-HYDRO 3600 10052 15300
PORINGALKUTHU LBE KSEB HYDRO-HYDRO 1600 9438 15300
PEPPARA KSEB HYDRO-HYDRO 300 395 15300
POOZHITHODE KSEB HYDRO-HYDRO 480 1045 15300
Page 38
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) PEECHI KSEB HYDRO-HYDRO 125 040 15300
RANI-PERUNADU KSEB HYDRO-HYDRO 400 585 15300
SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 79783 15300
SENGULAM HPS KSEB HYDRO-HYDRO 5120 11558 15300
SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 16711 15300
VILANGAD KSEB HYDRO-HYDRO 750 1578 15300
BARAPOLE KSEB HYDRO-HYDRO 1500 1932 15300
VELLATHOOVAL KSEB HYDRO-HYDRO 360 305 15300
CHIM0NY KSEB HYDRO-HYDRO 250 156 15300
ADYANPARA KSEB HYDRO-HYDRO 350 501 15300
BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 554 15300
KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 3801 15300
KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 23132 32800
ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 14416 62280
METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 523970 62280
METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 321270 62280
NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 336575 62280
NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 591240 62280
TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 508966 62280
KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 30897 62280
VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 18720 90699 62280
KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 33593 62280
BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 1047 62280
PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 1250 62280
PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 330 62280
MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 4897 62280
MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 032 62280
KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15681 62280
KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 40608 62280
KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 21342 62280
KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 4717 62280
KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4322 62280
KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2399 62280
METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 4416 62280
METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 8035 62280
BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2187 62280
BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2359 62280
BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2511 62280
BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 1949 62280
BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 1819 62280
POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 172 62280
SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 241 62280
MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 026 62280
THIRUMOORTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 136 62280
PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 9309 62280
VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 353 62280
SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 4192 62280
PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 6571 62280
SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 1186 62280
SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6319 62280
ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 6122 62280
KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 28674 62280
SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 18381 62280
SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 4258 62280
KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 12680 62280
KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4201 62280
ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 000 62280
PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 19175 62280
AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 078 62280
BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 504 62280
BHAVANI KATTALAI (BKB)(IIIampIII BB I amp II)TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 5847 62280
PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 000 62280
Page 39
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) SRI DAMODARAM STPS APPDCL THERMAL-COAL 160000 808108 36300
PRIVATE SECTOR
KARUPPUR TANJORE LANCO TANJORE PCL THERMAL-GAS 12000 48096 28770
SIMHAPURI ENERGY LTD SIMHAPURI ENERGY LTD THERMAL-COAL 60000 143900 39100
JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 7111 45500
SBU 1 JSW ENERGY LTD
VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 26000 159100
43300
SBU 2 JSW ENERGY LTD
VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 60000 247900
42800
LANCO KPLLANCO KONDAPALLI POWER
LTDTHERMAL-GAS 36814 85060
25776
LANCO KPL STG -IILANCO KONDAPALLI POWER
LTDTHERMAL-GAS 36600 12979
46330
LANCO KPL STG -IIIALANCO KONDAPALLI POWER
LTDTHERMAL-GAS 37100 85710
46330
LANCO KPL STG -III BLANCO KONDAPALLI POWER
LTDTHERMAL-GAS 37100 43639
46330
HINDUJA NATIONAL PCL HINDUJA NATIONAL PCL THERMAL-COAL 104000 303000 38200
MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 121164 49940
UDUPI POWER COR LTD ADANI POWER LTD THERMAL-COAL 120000 754613 42500
SPECTRUM POWER GENERATION
LTD SPECTRUM PG LTD THERMAL-GASN 20525 9256812
34952
TAQA NEYVELI POWER COM PVT
LTD TAQA NEYVELI THERMAL-LIG 25000 5840
34500
ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 251000 51000
ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 207860 36800
GMR VEMAGIRI POWER GENERATION
LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 30117
46450
EASTERN REGION
CENTRAL SECTOR
MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 64675 53113
MTPS STAGE - II KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 39000 1432 69138
BOKARO `B` TPS DVC THERMAL-COAL 63000 145670 31539
MEJIA TPS U 1-3 DVC THERMAL-COAL 63000 348298 31552
MEJIA TPS U 4 DVC THERMAL-COAL 21000 116099 34997
MEJIA TPS U 5-6 DVC THERMAL-COAL 50000 276427 35976
MEJIA TPS U 7-8 DVC THERMAL-COAL 100000 552854 36991
DURGAPUR STEEL TPS DVC THERMAL-COAL 100000 665550 39323
DURGAPUR TPS DVC THERMAL-COAL 21000 59270 35416
RAGHUNATHPUR TPS DVC THERMAL-COAL 120000 201650 35326
MAITHON HYDEL STA DVC HYDRO-HYDRO 6320 12200 17984
CHANDRAPURA TPSU1-3 DVC THERMAL-COAL 42000 257610 35095
CHANDRAPURA TPSU7-8 DVC THERMAL-COAL 50000 306673 34987
KODERMA TPS DVC THERMAL-COAL 100000 380180 38131
PANCHET HPS DVC HYDRO-HYDRO 8000 13360 17984
TILLAYA HPS DVC HYDRO-HYDRO 400 1410 17984
RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34700 35400
TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 277300 23200
TLDP -III NHPC LTD HYDRO-HYDRO 13200 55400 62000
TLDP -IV NHPC LTD HYDRO-HYDRO 16000 60300 25600
FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 957219 33700
FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 308943 41000
BONGAINGAON TPS NTPC LTD THERMAL-COAL 25000 153663 58600
KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 542277 34200
KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 942591 34200
BARH-II NTPC LTD THERMAL-COAL 132000 728021 44500
TALCHER TPS NTPC LTD THERMAL-COAL 46000 335521 30100
TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 702319 25600
TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1436521 24700
STATE SECTOR
BTPS(RampM) BIHAR STATE PGCL THERMAL-COAL 22000 12142 39700
BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 98331 10602
HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 50593 9482
CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 19689 2605
RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 53192 6033
UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 147208 14637
Page 40
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 60353 4519
IB TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 288567 25000
J P H GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 210 038 61100
MEYONG CHU GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 400 1086 61100
TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 122667 38200
DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 214339 43321
KOLAGHAT THERMAL POWER
STATION
WEST BENGAL PDCL THERMAL-COAL 126000 538269 31603
BAKRESHWAR THERMAL POWER
PLANT
WEST BENGAL PDCL THERMAL-COAL 105000 634876 32154
BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 45000 166855 33299
SANTHALDIH THERMAL POWER
STATION
WEST BENGAL PDCL THERMAL-COAL 50000 336442 34932
SAGARDIGHI THERMAL POWER
PROJECT
WEST BENGAL PDCL THERMAL-COAL 160000 423121 34705
JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 20344 68900
RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 24559 68900
TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 4623 68900
PURULIA PUMPED STORAGE
PROJECT
WEST BENGAL SEDCL HYDRO-HYDRO 90000 108816 68900
MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2768 68900
PRIVATE SECTOR
CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 49474 20230
CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 555500 70200
HALDIA ENERGY HALDIA ENERGY LTD THERMAL-COAL 60000 371000 50400
DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3688 63400
KAMALANGA TPS GMR KAMALANGA ENERGY LTD THERMAL-COAL 105000547670
33300
ADHUNIK POWER U-1 ADHUNIK POWER THERMAL-COAL 27000 158 44060
ADHUNIK POWER U-2 ADHUNIK POWER THERMAL-COAL 27000 168 44250
VL-JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 332800 23622
JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 43000 45250
JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 71700 37030
JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 70700 35920
JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 71100 38870
JOJOBERA UNIT 5 TATA POWER COM LTD THERMAL-COAL 12000 79300 44560
JOJOBERA UNIT 6 TATA POWER COM LTD THERMAL-WHR 12000 83700 12840
IEL KALINGANAGAR U-I TATA POWER COM LTD THERMAL-WG 6750 33400 22500
IEL KALINGANAGAR U-II TATA POWER COM LTD THERMAL-WG 6750 34800 22500
MAITHON UNIT 1 amp 2 TATA POWER COM LTD THERMAL-COAL 105000 678000 36100
HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 27500 24340
HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 28400 24340
HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 15800 24310
NORTH EASTERN REGION
CENTRAL SECTOR
LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 74100 36600
AGARTALA GT NEEPCO THERMAL-GAS 13500 88611 27210
ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 153111 32310
DOYANG HEP NEEPCO HYDRO-HYDRO 7500 25598 49801
KOPILI HEP NEEPCO HYDRO-HYDRO 20000 98186 11491
KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 19582 20237
KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 10310 17968
RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 124093 22945
TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 10100 17344 39000
STATE SECTOR
HYDRO POWER (122 Stns) ITANAGAR GOVT OF ARUNACHAL
PRADESHHYDRO-HYDRO 6971 6217270
24600
KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39514 17337
LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 82327 36810
NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 33318 48290
MYNTRIANG SHEP ST II ASSAM POWER GENCO HYDRO-HYDRO 300 567 35776
LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 9130 49200
LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 012 49200
DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 022 49200
TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 000 49200
UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 4990 16000
UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 6476 37000
UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 16494 14600
UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 3600 9556 15000
SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 758 8000
MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44070 44800
KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 154 41400
TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 091 41400
MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 411 41400
MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 394 41400
KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 760 41400
SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 3264 41400
LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 044 41400
BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 18953 28000
ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 43585 28200
GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 4080 11100
Note
LIG Lignite N Naptha WHR Waste Heat Recovery
Page 41
File NoCEA-CH-14-1142018-Coordination Division
2012-13 2013-14 2014-15 2015-16 2016-17
TampD Losses 2304 2284 2277 2181 2142
ATampC Losses 2548 2258 2462
Note As per PFC for utilities selling directly to consumers
Total Number of Villages
597464
Note From the year 2004-05 onwards Definition of Village Electrification-
A village would be declared Electrified if
Without
Subsidy
Gap ACS-
ARR(
Without
Subsidy)
Paiseunit
Gap ACS-
ARR (on
subsidy
booked
basis)
paiseunit
Gap ACS-
ARR (on
subsidyrece
ived basis)
paiseunit
2013-14 400 118 76 77
2014-15 412 108 58 60
Source- PFC Reports on the performance of State Power Utilities
2013-14 4894
2014-15 5304
2015-16 5459
2016-17 5743
2017-18 6080
11
Average cost of supply(ACS)
(paiseunit)
i) Basic Infrastructure such as Distribution Transformer and Distribution lines are provided in the inhabited locality
as well as Dalit Basti hemlet where it exists (For electrification through Non-Conventional Energy Sources a
Distribution Transformer may not be necessary)
14 All India Coal consumption for Power Generation (MT)
520
Average Revenue Realization(paiseunit)
518
Year
ii) Electricity is provided to Public places like Schools Panchayat Office Health Centre Dispensaries Community
Centres etc and
iv) Mandatory Certification from Gram Panchayat regarding the completion of village electrification should be
obtained
13 Average cost of Power amp Average Realisation
iii) The number of households electrified should be at least 10 of the total number of households in the village
11 T amp D and ATampC Losses ()
12 All India Village Electrification
Villiages Electrified (Nos)
10000All villages as per census 2011 has
been electrified on 28042018
Villages electrified
File NoCEA-CH-14-1142018-Coordination Division
SN Contents Page
1 Capacity Addition Targets and Achievements in 12th Plan 12
2 Capacity Addition Targets amp Achievements during Oct-2018 and April 2018- Oct 2018 13
3 Installed Capacity in various Regions including their shares 14-19
Section B - Capacity Addition
File NoCEA-CH-14-1142018-Coordination Division
Figures in MW
TARGET ACH TARGET ACH TARGET ACH TARGET ACH
CENTRAL 14878 15869 6004 2584 5300 2000 26182 20453
STATE 13922 22201 1608 2276 0 0 15530 24477
PRIVATE 43540 53661 3285 619 0 0 46825 54280
ALL INDIA 72340 91730 10897 5479 5300 2000 88537 99209
Figures in MW
Thermal Hydro Nuclear Total
Target Ach Target Ach Target Ach Target Ach
Central 4880 3170 800 390 500 6180 3560 5761
State 3546 1760 300 200 0 3846 1960 5096
Private 2940 3780 205 205 0 3145 3985 12671
Total 11366 8710 1305 795 500 0 13171 9505 7217
12
2 CAPACITY ADDITION TARGET AND ACHIEVEMENT FOR 2017-18 (IN MW)
1 Capacity Addtion Targets and Achievements in the 12th Plan
SECTORTHERMAL HYDRO NUCLEAR TOTAL
File NoCEA-CH-14-1142018-Coordination Division
(MW)
Cummulative
Deviation
Target Achievement Target Achievement (+) (-)
Central 2760 250 0 250 0 -250
State 450615 1030 0 1030 69755 -960245
Private 0 0 600 0 600 600
Total 726615 1280 600 1280 669755 -610245
Central 710 0 0 110 110 0
State 130 0 0 12999 30 -9999
Private 0 0 0 0 0 0
Total 840 0 0 23999 140 -9999
Nuclear Central 0 0 0 0 0 0
Central 3470 250 0 360 110 -250
State 463615 1030 0 115999 99755 -1060235
Private 0 0 600 0 600 600
Total 810615 1280 600 151999 809755 -710235
Electricity Generation (MU) Targets and Achievements for 2016-17
13
2 Capacity Addition Targets Achievements During Oct-2018
Schemes Sector
Target 2018-19
April 2018- Oct 2018Oct-18
Hydro
All India
Capacity Addition TargetsAchievements during the Month of Oct-2018
Thermal
12
80
24
0
0
15
20
67
0
14
0
0
81
0
0
200
400
600
800
1000
1200
1400
1600
Thermal Hydro Nuclear Total
MW
Targets and Achievement during 2018-19Target Achievement
600
0 00 0
600
0
100
200
300
400
500
600
700
800
900
1000
Target Achievement
MW
Targets and Achievement during Oct 2018Thermal Hydro
Nuclear Total
File NoCEA-CH-14-1142018-Coordination Division
Coal Gas Diesel Total
State 1593400 287920 000 1881320 000 869755 68956 2820031
Private 2276083 55800 000 2331883 000 251400 1261535 3844818
Central 1258537 234406 000 1492943 162000 849622 32900 2537465
Sub Total 5128020 578126 000 5706146 162000 1970777 1363391 9202314
State 2128000 284982 000 2412982 000 544650 31119 2988751
Private 3488567 467600 000 3956167 000 48100 2005170 6009437
Central 1504295 328067 000 1832362 184000 162000 66130 2244492
Sub Total 7120862 1080649 000 8201511 184000 754750 2102418 11242679
State 1943250 79198 28788 2051236 000 1183803 52102 3287141
Private 1212450 532210 47370 1792030 000 000 3495815 5287845
Central 1422502 35958 000 1458460 332000 000 49190 1839650
Sub Total 4578202 647366 76158 5301726 332000 1183803 3597107 10414636
State 695000 10000 000 705000 000 353792 22511 1081303
Private 637500 000 000 637500 000 39900 84853 762253
Central 1387664 000 000 1387664 000 100520 1000 1489184
Sub Total 2720164 10000 000 2730164 000 494212 108364 3332740
State 000 49771 3600 53371 000 42200 25674 121245
Private 000 2450 000 2450 000 000 2571 5021
Central 52002 125360 000 177362 000 103000 500 280862
Sub Total 52002 177581 3600 233183 000 145200 28745 407128
State 000 000 4005 4005 000 000 525 4530
Private 000 000 000 000 000 000 221 221
Central 000 000 000 000 000 000 510 510
Sub Total 000 000 4005 4005 000 000 1256 5261
State 6359650 711871 36393 7107913 000 2994200 200887 10303000
Private 7614600 1058060 47370 8720030 000 339400 6850164 15909594
Central 5625000 723791 000 6348791 678000 1215142 150230 8392163
Total 19599250 2493722 83763 22176734 678000 4548742 7201281 34604757
Figures at decimal may not tally due to rounding off
Note -
(As per latest information available with MNRE)
Break up of RES all India as on 30092018 is given below (in MW)
450695 3461510 2402166 7201281
A Oct 2018 669755 MW
B Capacity Retired
during
Oct 2018 705 MW
C Oct 2018 0 MW
D Oct 2018 A-B+C -35245 MW
Share of Telangana from JEGURUPADU CCPP Ph II has been removed and the same has been added to private sector of Andhra Pradesh due to expiry of PPA as per
request from TS Transco
Region
ALL INDIA INSTALLED CAPACITY (IN MW) OF POWER STATIONS (As on 31102018)
(UTILITIES)
Net Capacity Added during
1 RES include SHP BP UampI Solar and Wind Energy Installed capacity in respect of RES (MNRE) as on 30092018
Small
Hydro PowerWind Power
Bio-PowerSolar Power
Total
CapacityBM PowerCogen Waste to Energy
2 U-1 to 7 (76995=69755 MW) of LAKWA REPLACEMENT POWER PROJECT commissioned in April 2018 but intimated in October 2018
has been added to state sector of Assam
1 Badarpur TPS (705 MW) has been retired from central sector of Northern Region
Capacity Up-rated
Ownership Sector
873080 13830
Capacity Added during
1 U-2 (600 MW) of MAHAN TPP has been commissioned and added to private sector of Madhya Pradesh
Grand TotalThermalNuclear Hydro
Islands
ALL INDIA
Abbreviation- SHP=Small Hydro Project (le 25 MW) BP=Biomass Power UampI=Urban amp Industrial Waste Power RES=Renewable Energy Sources
Northern Region
Western Region
Southern Region
Eastern Region
North Eastern
Region
RES
(MNRE)
Modewise breakup
File NoCEA-CH-14-1142018-Coordination Division
Coal Gas Diesel Total
State 13500 180040 000 193540 000 000 000 193540
Private 86922 10800 000 97722 000 000 12157 109879
Central 311272 20701 000 331973 10283 72309 000 414565
Sub-Total 411694 211541 000 623235 10283 72309 12157 717984
State 272000 15000 000 287000 000 110282 5930 403212
Private 408078 000 000 408078 000 20000 34745 462823
Central 129472 53561 000 183034 10094 66370181 500 259998
Sub-Total 809550 68561 000 878112 10094 196652 41175 1126032
State 000 000 000 000 000 69460 25661 95121
Private 000 000 000 000 000 99200 60536 159736
Central 18340 6201 000 24541 2895 122388 000 149824
Sub-Total 18340 6201 000 24541 2895 291048 86197 404681
State 000 17500 000 17500 000 123000 12903 153403
Private 000 000 000 000 000 000 5985 5985
Central 50639 12907 000 63547 6798 109188 000 179533
Sub-Total 50639 30407 000 81047 6798 232188 18888 338921
State 176000 15000 000 191000 000 259770 12780 463550
Private 511550 000 000 511550 000 28800 115462 655812
Central 85458 26401 000 111859 19681 92342 000 223882
Sub-Total 773008 41401 000 814409 19681 380912 128242 1343244
State 585000 60380 000 645380 000 109618 2385 757383
Private 388200 000 000 388200 000 10400 710680 1109280
Central 120625 22110 000 142735 55674 73901 29400 301710
Sub-Total 1093825 82490 000 1176315 55674 193919 742465 2168373
State 546900 000 000 546900 000 72410 2510 621820
Private 871433 000 000 871433 000 84200 266691 1222324
Central 379639 54949 000 434588 28948 180253 3000 646789
Sub-Total 1797972 54949 000 1852921 28948 336863 272201 2490933
State 000 000 000 000 000 125215 6787 132002
Private 9900 45000 000 54900 000 8800 52244 115944
Central 34324 6966 000 41290 3124 47554 000 91968
Sub-Total 44224 51966 000 96190 3124 181569 59031 339914
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 3035 3035
Central 3815 1503 000 5317 801 10171 000 16289
Sub-Total 3815 1503 000 5317 801 10171 3035 19324
124953 29105 000 154058 23703 75145 000 252907
State 1593400 287920 000 1881320 000 869755 68956 2820031
Private 2276083 55800 000 2331883 000 251400 1261535 3844818
Central 1258537 234406 000 1492943 162000 849622 32900 2537465
Grand Total 5128020 578126 000 5706146 162000 1970777 1363391 9202314
Uttar Pradesh
Uttarakhand
Chandigarh
Grand TotalThermalNuclear
Hydro
(Renewable)
RES
(MNRE)
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
NORTHERN REGION
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
(As on 31102018)
Central - Unallocated
Total (Northern
Region)
Delhi
Haryana
Himachal Pradesh
Jammu amp Kashmir
Punjab
Rajasthan
State Ownership Sector
Modewise breakup
File NoCEA-CH-14-1142018-Coordination Division
(As on 31102018)
Coal Gas Diesel Total
State 000 000 000 000 000 000 005 005
Private 000 4800 000 4800 000 000 091 4891
Central 45478 1967 000 47445 2600 000 000 50045
Sub-Total 45478 6767 000 52245 2600 000 096 54941
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 1301 1301
Central 12663 4334 000 16997 700 000 000 17697
Sub-Total 12663 4334 000 16997 700 000 1301 18998
State 475000 217782 000 692782 000 77200 800 770782
Private 776567 396000 000 1172567 000 000 729782 1902349
Central 309051 42400 000 351451 55900 000 23830 431181
Sub-Total 1560618 656182 000 2216800 55900 77200 754412 3104312
State 408000 000 000 408000 000 170366 8396 586762
Private 617400 10000 000 627400 000 000 378205 1005605
Central 279441 25700 000 305141 27300 152000 30000 514441
Sub-Total 1304841 35700 000 1340541 27300 322366 416601 2106808
State 228000 000 000 228000 000 12000 1105 241105
Private 849000 000 000 849000 000 000 52430 901430
Central 195344 000 000 195344 4800 10000 000 210144
Sub-Total 1272344 000 000 1272344 4800 22000 53535 1352679
State 1017000 67200 000 1084200 000 285084 20813 1390097
Private 1245600 56800 000 1302400 000 48100 842815 2193315
Central 433475 227273 000 660748 69000 000 12300 742048
Sub-Total 2696075 351273 000 3047348 69000 333184 875927 4325459
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 546 546
Central 17444 6634 000 24078 900 000 000 24978
Sub-Total 17444 6634 000 24078 900 000 546 25524
211400 19759 000 231159 22800 000 000 253959
State 2128000 284982 000 2412982 000 544650 31119 2988751
Private 3488567 467600 000 3956167 000 48100 2005170 6009437
Central 1504295 328067 000 1832362 184000 162000 66130 2244492
Grand Total 7120862 1080649 000 8201511 184000 754750 2102418 11242679
Central - Unallocated
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
WESTERN REGION
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
State Ownership Sector
Modewise breakup
Grand TotalThermalNuclear
Hydro
(Renewable)
RES
(MNRE)
Total (Western
Region)
Goa
Daman amp Diu
Gujarat
Madhya Pradesh
Chhattisgarh
Maharashtra
Dadra amp Nagar
Naveli
File NoCEA-CH-14-1142018-Coordination Division
(As on 31102018)
Coal Gas Diesel Total
State 501000 23540 000 524540 000 167360 4875 696775
Private 387388 381318 3680 772386 000 000 693073 1465459
Central 167456 000 000 167456 12727 000 25000 205183
Sub-Total 1055844 404858 3680 1464382 12727 167360 722948 2367417
State 508250 000 000 508250 000 247993 4022 760265
Private 83945 83182 000 167127 000 000 375048 542175
Central 195612 000 000 195612 14873 000 1000 211485
Sub-Total 787807 83182 000 870989 14873 247993 380070 1513925
State 502000 000 12792 514792 000 359980 15533 890305
Private 195850 000 2520 198370 000 000 1275640 1474010
Central 282920 000 000 282920 69800 000 000 352720
Sub-Total 980770 000 15312 996082 69800 359980 1291173 2717035
State 000 000 15996 15996 000 188150 15402 219548
Private 61500 17400 000 78900 000 000 20899 99799
Central 114322 35958 000 150280 36200 000 5000 191480
Sub-Total 175822 53358 15996 245176 36200 188150 41301 510827
State 432000 52408 000 484408 000 220320 12270 716998
Private 483767 50310 41170 575247 000 000 1130984 1706231
Central 448952 000 000 448952 144800 000 18190 611942
Sub-Total 1364719 102718 41170 1508607 144800 220320 1161444 3035171
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 000 000
Central 10000 000 000 10000 000 000 000 10000
Sub-Total 10000 000 000 10000 000 000 000 10000
State 000 3250 000 3250 000 000 000 3250
Private 000 000 000 000 000 000 171 171
Central 24840 000 000 24840 8600 000 000 33440
Sub-Total 24840 3250 000 28090 8600 000 171 36861
178400 000 000 178400 45000 000 000 223400
State 1943250 79198 28788 2051236 000 1183803 52102 3287141
Private 1212450 532210 47370 1792030 000 000 3495815 5287845
Central 1422502 35958 000 1458460 332000 000 49190 1839650
Grand Total 4578202 647366 76158 5301726 332000 1183803 3597107 10414636
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
SOUTHERN REGION
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
State Ownership Sector
Modewise breakup
Grand TotalThermal RES
(MNRE)Nuclear
Hydro
(Renewable)
Kerala
Tamil Nadu
NLC
Puducherry
Central - Unallocated
Total (Southern
Region)
Andhra Pradesh
Telangana
Karnataka
File NoCEA-CH-14-1142018-Coordination Division
(As on 31102018)
Coal Gas Diesel Total
State 71000 000 000 71000 000 000 7070 78070
Private 28100 000 000 28100 000 000 25545 53645
Central 291433 000 000 291433 000 11000 000 302432
Sub-Total 390533 000 000 390533 000 11000 32615 434147
State 42000 000 000 42000 000 13000 405 55405
Private 73000 000 000 73000 000 000 3207 76207
Central 39374 000 000 39374 000 6100 000 45474
Sub-Total 154374 000 000 154374 000 19100 3612 177086
State 540000 10000 000 550000 000 98600 9195 657795
Private 242500 000 000 242500 000 000 34452 276952
Central 76077 000 000 76077 000 41000 000 117077
Sub-Total 858577 10000 000 868577 000 139600 43647 1051824
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 000 000
Central 698504 000 000 698504 000 18620 000 717124
Sub-Total 698504 000 000 698504 000 18620 000 717124
State 42000 000 000 42000 000 206192 630 248822
Private 293900 000 000 293900 000 000 21648 315548
Central 163390 000 000 163390 000 8900 1000 173290
Sub-Total 499290 000 000 499290 000 215092 23278 737660
State 000 000 000 000 000 36000 5211 41211
Private 000 000 000 000 000 39900 001 39901
Central 8703 000 000 8703 000 6400 000 15103
Sub-Total 8703 000 000 8703 000 82300 5212 96215
110183 000 000 110183 000 8501 000 118684
State 695000 10000 000 705000 000 353792 22511 1081303
Private 637500 000 000 637500 000 39900 84853 762253
Central 1387664 000 000 1387664 000 100520 1000 1489184
Grand Total 2720164 10000 000 2730164 000 494212 108364 3332740
(As on 31102018)
Coal Gas Diesel Total
State 000 32821 000 32821 000 10000 3001 45822
Private 000 2450 000 2450 000 000 1680 4130
Central 27902 43556 000 71458 000 36851 000 108309
Sub-Total 27902 78827 000 106729 000 46851 4681 158261
State 000 000 000 000 000 000 10710 10710
Private 000 000 000 000 000 000 539 539
Central 2470 4682 000 7152 000 11800 000 18952
Sub-Total 2470 4682 000 7152 000 11800 11249 30201
State 000 000 000 000 000 32200 3103 35303
Private 000 000 000 000 000 000 006 006
Central 3040 10969 000 14009 000 7446 000 21455
Sub-Total 3040 10969 000 14009 000 39646 3109 56764
State 000 16950 000 16950 000 000 1601 18551
Private 000 000 000 000 000 000 009 009
Central 3740 43695 000 47435 000 7077 500 55012
Sub-Total 3740 60645 000 64385 000 7077 2110 73572
State 000 000 3600 3600 000 000 545 4145
Private 000 000 000 000 000 000 217 217
Central 3140 7157 000 10297 000 9677 000 19974
Sub-Total 3140 7157 3600 13897 000 9677 762 24336
State 000 000 000 000 000 000 3067 3067
Private 000 000 000 000 000 000 100 100
Central 2140 4893 000 7033 000 5860 000 12893
Sub-Total 2140 4893 000 7033 000 5860 3167 16060
State 000 000 000 000 000 000 3647 3647
Private 000 000 000 000 000 000 020 020
Central 2070 4046 000 6116 000 9913 000 16029
Sub-Total 2070 4046 000 6116 000 9913 3667 19696
7500 6362 000 13862 000 14376 000 28238
State 000 49771 3600 53371 000 42200 25674 121245
Private 000 2450 000 2450 000 000 2571 5021
Central 52002 125360 000 177362 000 103000 500 280862
Grand Total 52002 177581 3600 233183 000 145200 28745 407128
Central - Unallocated
Total (Eastern
Region)
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
NORTH-EASTERN REGION
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
State Ownership Sector
Modewise breakup
Grand TotalThermalNuclear
Bihar
Jharkhand
West Bengal
DVC
Odisha
Sikkim
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
EASTERN REGION
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
Ownership Sector
Modewise breakup
Grand TotalThermalNuclear
Hydro
(Renewable)
RES
(MNRE)
Manipur
Nagaland
State
Mizoram
Central - Unallocated
Total (North-
Eastern Region)
Hydro
(Renewable)
RES
(MNRE)
Assam
Arunachal Pradesh
Meghalaya
Tripura
File NoCEA-CH-14-1142018-Coordination Division
(As on 31102018)
Coal Gas Diesel Total
State 000 000 4005 4005 000 000 525 4530
Private 000 000 000 000 000 000 146 146
Central 000 000 000 000 000 000 510 510
Sub-Total 000 000 4005 4005 000 000 1181 5186
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 075 075
Central 000 000 000 000 000 000 000 000
Sub-Total 000 000 000 000 000 000 075 075
State 000 000 4005 4005 000 000 525 4530
Private 000 000 000 000 000 000 221 221
Central 000 000 000 000 000 000 510 510
Grand Total 000 000 4005 4005 000 000 1256 5261
19
Andaman amp
Nicobar
lakshadweep
Total (Islands)
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
State Ownership Sector
Modewise breakup
Grand TotalThermalNuclear
Hydro
(Renewable)
RES
(MNRE)
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
ISLANDS
File NoCEA-CH-14-1142018-Coordination Division
SrNo Contents Page
1 Executive summary of Target and Achievement of Transmission Lines during 2018-19
20(1)
2 List of Transmission Lines CommissionedReady for commissioning during Oct-2018 20(2)
Section C - Transmission Lines
File NoCEA-CH-14-1142018-Coordination Division
Executive summary of Target and Achievement of Transmission Lines during 2018-19 As on Oct-18
(All figures in circuit kms)
Centr
al S
ecto
r
Sta
te S
ecto
r
JV
Private
Secto
r
To
tal
Centr
al S
ecto
r
Sta
te S
ecto
r
JV
Private
Secto
r
To
tal
Centr
al S
ecto
r
Sta
te S
ecto
r
JV
Private
Secto
r
To
tal
Centr
al S
ecto
r
Sta
te S
ecto
r
JV
Private
Secto
r
To
tal
Centr
al S
ecto
r
Sta
te S
ecto
r
JV
Private
Secto
r
To
tal
Cen
tral S
ecto
r
Sta
te S
ecto
r
JV
Pri
vate
Secto
r
Gra
nd
To
tal
0 0 0 0 0 0 0 0 4692 766 827 6285 3045 5906 980 9931 553 5878 0 6431 8290 12550 1807 22647
Oct18 Programme 0 0 0 0 0 0 0 0 300 0 0 300 662 90 562 1314 0 723 0 723 962 813 562 2337
Achievement 0 0 0 0 0 0 0 0 729 0 0 729 471 266 0 737 0 401 0 401 1200 667 0 1867
Upto Oct-18 Programme 0 0 0 0 0 0 0 0 3004 416 0 3420 1350 3109 562 5021 481 4346 0 4827 4835 7871 562 13268
Achievement 0 0 0 0 0 0 0 0 2286 0 178 2464 1436 1783 1595 4814 60 4461 0 4521 3782 6244 1773 11799
20(1)
220 kV Grand Total 800 kV 500 kV
Programme 2018-19
Programme
Achievement
HVDC765 kV 400 kV
File NoCEA-CH-14-1142018-Coordination Division
SlNo Line
Length
(cKM)
1 2 3 4 5 6
1 765 Jharsuguda - Dharamjaygarh line DC PGCIL 296
2 765LILO of Kurnool - Thirvualam line at
CuddapahDC PGCIL 190
3 765 Salem PS - Madhugiri PS line SC PGCIL 243
4 400 Cuddapah - Hindupur line (Q) DC PGCIL 338
5 400LILO of Both Ckt of Bamnauli - Samaypur at
TughlakabadMC PGCIL 114
6 400LILO-Out of Cuddapah - Hindupur line (Q)
(Both Ckts) at NP Kunta ssDC PGCIL 19
1200
7 400LILO of Sterlite - Meramundali at Lapanga
4oo kV ssDC OPTCL 14
8 400 Sterlite - Lapanga line DC OPTCL 37
9 400 TMDC Podili - Sattapenalli line DC APTRANSCO 215
10 230Neyveli 230110 kV ss - Eachangadu
230kV FeederSC TANTRANSCO 1
11 230 NNTPS - Neyveli 230110kV ss DC TANTRANSCO 2
12 220 Ajmer (400 kV) - Bherunda (TK) DC RVPNL 100
13 220 Aligarh - Atrauli line DC UPPTCL 77
14 220 Khandwa - Chhanera line DC MPPTCL 78
15 220LILO of one Ckt of Hadala - Sartanpar line
at Wankaner on MC towersDC GETCO 6
16 220 LILO of one Ckt of Vita - Miraj at Alkud ss DC MSETCL 27
17 220 Mendhigiri - Alkud ss DC MSETCL 110
667
1867
20(2)
Grand Total
2Transmission Lines (220 kV and above) CommissionedReady for commissioning During Oct-2018
As on 31-10-18
Voltage
Level (kV)Name of Transmission Lines
Circuit
Type
Executing
Agency
CENTRAL SECTOR
Total of CENTRAL SECTOR
STATE SECTOR Sector
Total of STATE SECTOR
File NoCEA-CH-14-1142018-Coordination Division
SN Contents Page
1 Executive summary of Target and Achievement of Substations during 2018-19 21(1)
2Sub Stations (220 kV and above) commissionedready for commisssioning during Oct-
201821(2)
Section D - Sub Stations
File NoCEA-CH-14-1142018-Coordination Division
1 Executive summary of Target and Achievement of Substations during 2018-19 As on Oct-18
(All figures in circuit MVA)
Centr
al S
ecto
r
Sta
te S
ecto
r
JV
Private
Secto
r
To
tal
Centr
al S
ecto
r
Sta
te S
ecto
r
JV
Private
Secto
r
To
tal
Centr
al S
ecto
r
Sta
te S
ecto
r
JV
Private
Secto
r
To
tal
Centr
al S
ecto
r
Sta
te S
ecto
r
JV
Private
Secto
r
To
tal
Centr
al S
ecto
r
Sta
te S
ecto
r
JV
Private
Secto
r
To
tal
Cen
tral S
ecto
r
Sta
te S
ecto
r
JV
Pri
vate
Secto
r
Gra
nd
To
tal
3000 0 0 3000 0 0 0 0 22200 0 0 22200 8185 13085 630 21900 740 14760 0 15500 34125 27845 630 62600
Oct18 Programme 0 0 0 0 0 0 0 0 0 0 0 0 1000 1260 630 2890 0 1400 0 1400 1000 2660 630 4290
Achievement 0 0 0 0 0 0 0 0 3000 0 0 3000 1500 3120 0 4620 0 2220 0 2220 4500 5340 0 9840
Upto Oct-18 Programme 0 0 0 0 0 0 0 0 10000 0 0 10000 6130 7435 630 14195 0 9670 0 9670 16130 17105 630 33865
Achievement 0 0 0 0 0 0 0 0 14000 0 0 14000 9000 7550 630 17180 0 10610 0 10610 23000 18160 630 41790
21(1)
220 kV Grand Total 800 kV 500 kV
Programme 2018-19
Programme
Achievement
HVDC765 kV 400 kV
File NoCEA-CH-14-1142018-Coordination Division
As on 31-10-18
Sl Voltage Ratio Capacity
No (kVkV) (MWMVA)
1 2 3 4 5
1 Cuddapah Ss 765400 PGCIL 3000
2 Tughlakabad SS (GIS) 400220 PGCIL 1500
Total of CENTRAL SECTOR 4500
3 Panki Kanpur (Aug) TF-I 400200 UPPTCL 75
4 Hindupur ss (1st ICT) 400220 APTRANSCO 315
5 Thappagundu ss 400110 TANTRANSCO 600
6 Mendhasal (2nd power TF) 400220 OPTCL 20
7 Jodhpur ss (New) 400220 RVPNL 315
8 Shankarpally 400220 TSTRANSCO 500
9 Podili ss (1st ICT) 400220 APTRANSCO 315
10 Doni (Gadag)SS 400220 KPTCL 1000
11 Porur (Addl TF) 230110 TANTRANSCO 100
12 Anuppankulam (Addl TF) 230110 TANTRANSCO 60
13 Neyveli SS 230110 TANTRANSCO 480
14 Savarkundla (Aug) 22066 GETCO 60
15 Bhuna (Aug) 220132 HVPNL 100
16 Madanpur (Aug) 22066 HVPNL 100
17 Gurgaon Sec-52A (Aug) 22066 HVPNL 160
18 IA Hisar (Aug) 220132 HVPNL 50
19 Narwana (Aug) 220132 HVPNL 60
20 Therubali (3rd Auto TF) 220132 OPTCL 160
21 Halasar ss 220132 RVPNL 160
22 Bansi Siddaharthnagar (Aug) TF-I 220132 UPPTCL 60
23 Hata Kushinagar (New) TF-I 220132 UPPTCL 100
24 Gomti nagar Lucknow (Aug) TF-IV 22033 UPPTCL 60
25 Kanpur Road Lucknow (New) TF-III 22033 UPPTCL 60
26 Asoj (Aug) 22066 GETCO 150
27 Kangasiyali (Aug) 22066 GETCO 60
28 Karmsad (Aug) 22066 GETCO 160
29 Lalpar (Aug) 22066 GETCO 60
TOTAL STATE SECTOR 5340
GRAND TOTAL 9840
21(2)
PRIVATE SECTOR
CENTRAL SECTOR
STATE SECTOR
2Sub-Stations (220 kV and above) CommissionedReady for commissioning During Oct-2018
Name of Sub StationsExecuting
Agency
File NoCEA-CH-14-1142018-Coordination Division
SN Contents Page
1 Electricity Generation (MU) Targets and Achievements for 2018-19 22
Section E - Electricity Generation
File NoCEA-CH-14-1142018-Coordination Division
Programme Achievement Ach Programme Achievement Ach
Central Sector 35160700 3028100 3162321 10443 20144400 21150469 10499
State Sector 35132000 3010000 3017260 10024 19922100 19549030 9813
PvtIPP Sector 36999700 3240600 3375603 10417 21598300 20794155 9628
PvtUTL Sector 1857600 164500 180597 10979 1130900 1203107 10638
Total 109150000 9443200 9735781 10310 62795700 62696761 9984
Central Sector 5617600 420900 451004 10715 4193000 4045436 9648
State Sector 6110600 559500 708469 12663 4049400 4433000 10947
PvtIPP Sector 1141800 80500 90122 11195 976400 1021963 10467
PvtUTL Sector 130000 11300 12564 11119 76700 99943 13030
Total 13000000 1072200 1262159 11772 9295500 9600342 10328
Central Sector 3850000 353300 303310 8585 2068900 2203540 10651
Total 3850000 353300 303310 8585 2068900 2203540 10651
Bhutan Import 500000 63300 35395 5592 347000 416660 12007
Central Sector 44628300 3802300 3916635 10301 26406300 27399445 10376
State Sector 41242600 3569500 3725729 10438 23971500 23982030 10004
Pvt Sector 40129100 3496900 3658886 10463 23782300 23119168 9721
Total 126500000 10932000 11336645 10370 74507100 74917303 10055
Provisional based on actual-cum-Assesment
Figs in MU
Cummulative
Achievement
Cummulative
Achievement
Sep-18 Sep-17 Upto Sep-2018 Upto Sep-2017
1073794 748889 7332680 5660929
22
Renewable Energy Generation
Achievement
Oct-2018
1 Electricity Generation (MU) Targets and Achievememts for 2018-19
All India Energy Generation During April 2018- Oct 2018 (MU)
Target (2018-19)April 2018- Oct 2018
Sector
Hydro
Thermal
Nuclear
627957
92955
20689
745071
626968
96003
22035
749173
0
100000
200000
300000
400000
500000
600000
700000
800000
Thermal Hydro Nuclear Total
Programme
Achievement
File NoCEA-CH-14-1142018-Coordination Division
SN Contents Page
1 Energy Power Supply Position (Provisional) for Oct-2018 and during April 2018- Oct 2018 23
2 Peak Power Supply Position (Provisional) for Oct-2018 and during April 2018- Oct 2018 24
3 Energy Power Supply Position (Revised) for Sep-2018 and during April 2018- Sept 2018 25
4 Peak Power Supply Position (Revised) for Sep-2018 and during April 2018- Sept 2018 26
5 Notified Power cuts Restrictions on Industries during Oct-2018 27
6 Power Supply to Agricultural Sector during Oct-2018 28
Section F - Power supply position
File NoCEA-CH-14-1142018-Coordination Division
आकड़ मममलयन यननट नट Figures in MU net
ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied
कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )
चडीगढ़ Chandigarh 108 108 0 00 1055 1055 0 00
दिलली Delhi 2490 2489 1 00 22524 22510 14 01
हरियजणज Haryana 4554 4554 0 00 35205 35205 0 00
दहमजचल परिश Himachal Pradesh 788 787 2 02 5728 5560 168 29
रमम कशमीि Jammu amp Kashmir 1497 1219 278 186 10982 8865 2117 193
परजब Punjab 4418 4418 0 00 38832 38819 13 00
िजरसथजन Rajasthan 6748 6748 0 00 45341 45181 160 04
उतति परिश Uttar Pradesh 10136 9973 164 16 75485 74808 676 09
उततिजखड Uttarakhand 1083 1081 3 03 8395 8310 85 10
उततरी कषतर Northern Region 31822 31375 447 14 243547 240314 3233 13
छततीसगढ़ Chhattisgarh 2454 2453 1 00 16119 16091 28 02
गरिजत Gujarat 11636 11636 0 00 70782 70768 14 00
मधय परिश Madhya Pradesh 5860 5859 1 00 38412 38410 2 00
महजिजषटर Maharashtra 15223 15095 128 08 95489 95355 134 01
िमन औि दिउ Daman amp Diu 216 216 0 00 1523 1523 0 00
िजिि व नगि हवली Dadra amp Nagar Haveli 553 553 0 00 3757 3757 0 00
गोवज Goa 366 366 0 00 2497 2495 2 01
पशचिमी कषतर Western Region 36308 36178 130 04 228579 228398 180 01
आनधर परिश Andhra Pradesh 5860 5854 6 01 37377 37334 43 01
तलगजनज Telangana 6748 6742 6 01 38251 38205 46 01
कनजाटक Karnataka 5842 5835 7 01 39111 39059 52 01
किल Kerala 2116 2096 20 09 14256 14160 96 07
तममल नजड Tamil Nadu 8611 8601 10 01 65742 65666 76 01
पडचिी Puducherry 216 215 1 05 1654 1646 8 05
लकष-दवीप Lakshadweep 4 4 0 0 27 27 0 0
दकषकषणी कषतर Southern Region 29392 29342 50 02 196390 196069 321 02
बबहजि Bihar 2742 2738 4 01 19143 18951 192 10
िजमोिि घजटी ननगम DVC 1712 1698 13 08 13096 12828 268 20
झजिखणड Jharkhand 701 697 4 06 5022 4949 73 15
ओडडशज Odisha 3147 3134 13 04 20224 20192 32 02
पशशचम बगजल West Bengal 4204 4200 4 01 33008 32881 127 04
मसशककम Sikkim 40 40 0 00 279 279 0 01
अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 67 202 188 13 67
परवी कषतर Eastern Region 12547 12507 40 03 90772 90080 692 08
अरणजचल परिश Arunachal Pradesh 67 66 1 09 502 496 7 13
असम Assam 833 809 24 29 6153 5903 250 41
मणणपि Manipur 72 71 1 10 485 478 7 14
मघजलय Meghalaya 147 147 0 00 1043 1042 0 00
ममज़ोिम Mizoram 63 62 1 08 365 359 5 14
नजगजलड Nagaland 76 67 8 110 540 481 59 109
बिपिज Tripura 130 129 1 09 1025 1007 19 18
उततर-परवी कषतर North-Eastern Region 1387 1351 35 25 10113 9766 346 34
समपणण भारत All India 111455 110753 702 06 769399 764627 4773 06
23
ऊराण वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Energy Power Supply Position Report (Provisional)
राजयStateअकरबर2018 October2018 अपरल2018 -अकरबर2018 April2018 to October2018
ऊरजा पनत ा म कमी ऊरजा पनत ा म कमीEnergy not Supplied
Excludes energy exported to Bangladesh
Energy not Supplied
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
File NoCEA-CH-14-1142018-Coordination Division
अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met
कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )
चडीगढ़ Chandigarh 217 217 0 00 369 369 0 00
दिलली Delhi 4713 4713 0 00 7016 7016 0 00
हरियजणज Haryana 7948 7948 0 00 10270 10270 0 00
दहमजचल परिश Himachal Pradesh 1520 1520 0 00 1520 1520 0 00
रमम कशमीि Jammu amp Kashmir 2836 2269 567 200 2951 2361 590 200
परजब Punjab 7979 7979 0 00 12638 12638 0 00
िजरसथजन Rajasthan 11450 11450 0 00 11698 11698 0 00
उतति परिश Uttar Pradesh 17434 16745 688 39 20498 20062 436 21
उततिजखड Uttarakhand 1943 1943 0 00 2143 2143 0 00
उततरी कषतर Northern Region 50659 49635 1024 20 63166 61726 1440 23
छततीसगढ़ Chhattisgarh 4414 4268 146 33 4414 4268 146 33
गरिजत Gujarat 18148 18130 19 01 18148 18130 19 01
मधय परिश Madhya Pradesh 11356 11317 39 03 11356 11317 39 03
महजिजषटर Maharashtra 23864 23159 705 30 23864 23254 610 26
िमन औि दिउ Daman amp Diu 342 341 1 02 357 356 1 02
िजिि व नगि हवली Dadra amp Nagar Haveli 784 780 4 05 816 815 1 01
गोवज Goa 536 536 0 00 596 596 0 00
पशचिमी कषतर Western Region 56548 55695 853 15 56548 55695 853 15
आनधर परिश Andhra Pradesh 9435 9435 0 00 9435 9435 0 00
तलगजनज Telangana 10603 10603 0 00 10815 10815 0 00
कनजाटक Karnataka 10741 10741 0 00 10741 10741 0 00
किल Kerala 3727 3644 83 22 4050 3997 53 13
तममल नजड Tamil Nadu 14747 14333 414 28 15029 14981 47 03
पडचिी Puducherry 363 362 1 03 420 400 19 46
लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0
दकषकषणी कषतर Southern Region 45279 45226 53 01 45946 45684 262 06
बबहजि Bihar 4945 4945 0 00 5050 5045 5 01
िजमोिि घजटी ननगम DVC 2729 2729 0 00 2874 2874 0 00
झजिखणड Jharkhand 1260 1260 0 00 1339 1284 55 41
ओडडशज Odisha 5624 5224 400 71 5624 5357 268 48
पशशचम बगजल West Bengal 8775 8775 0 00 9130 9123 7 01
मसशककम Sikkim 86 86 0 00 90 90 0 00
अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7
परवी कषतर Eastern Region 22959 22567 392 17 22959 22567 392 17
अरणजचल परिश Arunachal Pradesh 138 125 13 94 138 133 5 37
असम Assam 1785 1704 81 45 1865 1809 56 30
मणणपि Manipur 187 185 2 11 193 186 7 36
मघजलय Meghalaya 336 336 0 00 371 368 2 07
ममज़ोिम Mizoram 99 97 2 20 103 98 4 41
नजगजलड Nagaland 134 131 3 22 156 138 18 117
बिपिज Tripura 269 269 0 00 298 293 5 17
उततर-परवी कषतर North-Eastern Region 2790 2700 90 32 2967 2850 117 39
समपणण भारत All India 172945 170604 2341 14 177022 175528 1494 08
24
अधिकतम वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Peak Power Supply Position Report (Provisional)
आकड़ मगज वजट नट Figures in MW netअपरल2018 -अकरबर2018 April2018 to October2018
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
मजग की पनता म कमी Demand not Met
Excludes the supply to Bangladesh
राजयStateअकरबर2018 October2018
मजग की पनता म कमी Demand not Met
File NoCEA-CH-14-1142018-Coordination Division
आकड़ मममलयन यननट नट Figures in MU net
ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied
कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )
चडीगढ़ Chandigarh 141 141 0 00 947 947 0 00
दिलली Delhi 2925 2924 1 00 20034 20021 13 01
हरियजणज Haryana 4794 4794 0 00 30651 30651 0 00
दहमजचल परिश Himachal Pradesh 876 853 24 27 4940 4773 167 34
रमम कशमीि Jammu amp Kashmir 1520 1246 274 180 9485 7646 1839 194
परजब Punjab 5575 5575 0 00 34414 34401 13 00
िजरसथजन Rajasthan 6202 6201 0 00 38594 38434 160 04
उतति परिश Uttar Pradesh 10211 10124 86 08 65349 64836 513 08
उततिजखड Uttarakhand 1162 1149 13 11 7311 7229 82 11
उततरी कषतर Northern Region 33405 33008 398 12 211725 208939 2786 13
छततीसगढ़ Chhattisgarh 2403 2388 15 06 13665 13638 27 02
गरिजत Gujarat 10122 10122 0 00 59146 59132 14 00
मधय परिश Madhya Pradesh 5492 5491 1 00 32552 32551 1 00
महजिजषटर Maharashtra 13615 13612 3 00 80266 80260 6 00
िमन औि दिउ Daman amp Diu 221 221 0 00 1306 1306 0 00
िजिि व नगि हवली Dadra amp Nagar Haveli 551 551 0 00 3204 3204 0 00
गोवज Goa 339 339 0 00 2131 2128 2 01
पशचिमी कषतर Western Region 32742 32723 19 01 192270 192220 50 00
आनधर परिश Andhra Pradesh 5294 5287 7 01 31518 31480 37 01
तलगजनज Telangana 6279 6272 8 01 31503 31463 40 01
कनजाटक Karnataka 5701 5693 8 01 33269 33225 45 01
किल Kerala 2050 2026 24 12 12140 12063 76 06
तममल नजड Tamil Nadu 8971 8959 12 01 57131 57065 66 01
पडचिी Puducherry 226 224 2 08 1438 1431 7 05
लकष-दवीप Lakshadweep 4 4 0 0 23 23 0 0
दकषकषणी कषतर Southern Region 28520 28460 60 02 166998 166727 271 02
बबहजि Bihar 2839 2793 46 16 16400 16213 188 11
िजमोिि घजटी ननगम DVC 1901 1750 151 79 11384 11130 254 22
झजिखणड Jharkhand 740 723 17 22 4321 4252 69 16
ओडडशज Odisha 2921 2918 3 01 17077 17058 19 01
पशशचम बगजल West Bengal 4902 4879 23 05 28804 28681 123 04
मसशककम Sikkim 39 39 0 01 239 239 0 01
अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 67 173 162 12 67
परवी कषतर Eastern Region 13341 13102 240 18 78225 77573 652 08
अरणजचल परिश Arunachal Pradesh 74 73 1 10 435 429 6 14
असम Assam 950 914 36 38 5320 5094 226 43
मणणपि Manipur 70 69 1 11 414 408 6 15
मघजलय Meghalaya 150 150 0 01 896 896 0 01
ममज़ोिम Mizoram 58 57 1 12 302 297 5 16
नजगजलड Nagaland 80 72 8 104 464 414 50 108
बिपिज Tripura 192 191 1 07 895 878 17 19
उततर-परवी कषतर North-Eastern Region 1575 1527 48 31 8726 8415 311 36
समपणण भारत All India 109584 108819 765 07 657944 653873 4071 06
Energy not Supplied Energy not Supplied
ससतबर2018 September2018 अपरल2018 -ससतबर2018 April2018 to September2018
ऊरजा पनत ा म कमी ऊरजा पनत ा म कमी
Excludes energy exported to Bangladesh
राजयState
ऊराण वरवदयत आपरतण शथिरत ररपोरण (सशोधित) Energy Power Supply Position Report (Revised)
25
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
File NoCEA-CH-14-1142018-Coordination Division
अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met
कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )
चडीगढ़ Chandigarh 293 293 0 00 369 369 0 00
दिलली Delhi 5358 5358 0 00 7016 7016 0 00
हरियजणज Haryana 9008 9008 0 00 10270 10270 0 00
दहमजचल परिश Himachal Pradesh 1466 1466 0 00 1479 1479 0 00
रमम कशमीि Jammu amp Kashmir 2951 2361 590 200 2951 2361 590 200
परजब Punjab 11405 11405 0 00 12638 12638 0 00
िजरसथजन Rajasthan 10612 10612 0 00 11698 11698 0 00
उतति परिश Uttar Pradesh 18346 18121 225 12 20498 20062 436 21
उततिजखड Uttarakhand 1996 1996 0 00 2143 2143 0 00
उततरी कषतर Northern Region 56407 55649 758 13 63166 61726 1440 23
छततीसगढ़ Chhattisgarh 4404 4075 328 75 4404 4136 268 61
गरिजत Gujarat 16963 16963 0 00 17053 16963 90 05
मधय परिश Madhya Pradesh 8811 8771 41 05 8811 8775 36 04
महजिजषटर Maharashtra 22455 22349 106 05 23395 23254 141 06
िमन औि दिउ Daman amp Diu 357 356 1 02 357 356 1 02
िजिि व नगि हवली Dadra amp Nagar Haveli 816 815 1 01 816 815 1 01
गोवज Goa 596 596 0 00 596 596 0 00
पशचिमी कषतर Western Region 52933 52895 38 01 53841 52895 945 18
आनधर परिश Andhra Pradesh 9435 9416 19 02 9435 9416 19 02
तलगजनज Telangana 10815 10815 0 00 10815 10815 0 00
कनजाटक Karnataka 10103 10090 13 01 10690 10688 2 00
किल Kerala 3888 3638 251 64 4050 3997 53 13
तममल नजड Tamil Nadu 14556 14553 3 00 15029 14981 47 03
पडचिी Puducherry 390 372 17 45 420 400 19 46
लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0
दकषकषणी कषतर Southern Region 45542 45428 114 02 45946 45684 262 06
बबहजि Bihar 5050 5045 5 01 5050 5045 5 01
िजमोिि घजटी ननगम DVC 2641 2641 0 00 2874 2874 0 00
झजिखणड Jharkhand 1233 1233 0 00 1339 1284 55 41
ओडडशज Odisha 4906 4906 0 00 5357 5357 0 00
पशशचम बगजल West Bengal 8644 8639 5 01 9130 9123 7 01
मसशककम Sikkim 78 78 0 00 90 90 0 00
अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7
परवी कषतर Eastern Region 22110 22100 10 00 22470 22290 180 08
अरणजचल परिश Arunachal Pradesh 132 130 2 15 138 133 5 37
असम Assam 1865 1809 56 30 1865 1809 56 30
मणणपि Manipur 184 182 2 13 193 186 7 36
मघजलय Meghalaya 317 317 0 00 371 368 2 07
ममज़ोिम Mizoram 95 93 2 23 103 98 4 41
नजगजलड Nagaland 142 138 5 32 156 138 18 117
बिपिज Tripura 296 293 3 10 298 293 5 17
उततर-परवी कषतर North-Eastern Region 2921 2850 71 24 2967 2850 117 39
समपणण भारत All India 177022 175528 1494 08 177022 175528 1494 08
26
मजग की पनता म कमी मजग की पनता म कमी Demand not MetDemand not Met
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
Excludes the supply to Bangladesh
अधिकतम वरवदयत आपरतण शथिरत ररपोरण (सशोधित) Peak Power Supply Position Report (Revised)
आकड़ मगज वजट नट Figures in MW net
राजयStateससतबर2018 September2018 अपरल2018 -ससतबर2018 April2018 to September2018
File NoCEA-CH-14-1142018-Coordination Division
अकरबर2018 October2018अपरल2018 -अकरबर2018 April2018 to October2018
उततरी कषतर Northern Region
चडीगढ़ Chandigarh Data not received Data not received
दिलली Delhi
हरियजणज Haryana
दहमजचल परिश Himachal Pradesh
रमम कशमीि Jammu amp Kashmir Data not received Data not received
परजब Punjab
िजरसथजन Rajasthanउतति परिश Uttar Pradesh
उततिजखड Uttarakhand
पशचिमी कषतर Western Region
छततीसगढ़ Chhattisgarh
गरिजत Gujarat
मधय परिश Madhya Pradesh
महजिजषटर Maharashtra
गोवज Goa
दकषकषणी कषतर Southern Region
आनधर परिश Andhra Pradesh
तलगजनज Telangana
कनजाटक Karnataka
किल Kerala
तममल नजड Tamil Nadu
पडचिी Puducherryपरवी कषतर Eastern Region
बबहजि Bihar
झजिखणड Jharkhand
ओडडशज Odisha
पशशचम बगजल West Bengal
N
o No
tified
Cuts
N
o No
tified
Cuts
27
अकरबर 2018 म इडथरीर पर वरवदयत करौती का वरवरवरण Notified Power CutsRestrictions on Industries during October2018
राजय कषतर State Regionऊराणमाग करौती EnergyDemand Cut
No Notified Cuts No Notified Cuts
File NoCEA-CH-14-1142018-Coordination Division
अकरबर2018 October2018अपरल2018 -अकरबर2018 April2018 to October2018
उततरी कषतर Northern Region
चडीगढ़ Chandigarh Data not received Data not received
दिलली Delhi Data not received Data not received
हरियजणज Haryana 940 hrsday 0709 - 0950 hrsday
दहमजचल परिश Himachal Pradesh No cut imposed on agriculture consumers and uninterrupted
power is being supplied to agriculture sector
HPSEBL has only 2 agriculture consumers and uninterrupted
power is being supplied to agriculture sector
रमम कशमीि Jammu amp Kashmir Data not received Data not received
परजब Punjab 0507 hrsday 0349 - 0844 hrsday
िजरसथजन Rajasthan 0630 hrsday 0630 hrsday
उतति परिश Uttar Pradesh 1825 hrsday 1814 - 1858 hrsday
उततिजखड Uttarakhand 2350 hrsday 2128 - 2357 hrsday
पशचिमी कषतर Western Region
छततीसगढ़ Chhattisgarh 18hoursday 18 hrsday
गरिजत Gujarat 805 hrsday 805 hrsday
मधय परिश Madhya Pradesh Three-Phase Supply(Irrigation)-947 hrs day
Three-Phase (Mixed) Supply - 2311 hrs day
Three-Phase Supply(Irrigation)- 0933 - 0947 hrs day Three-
Phase (Mixed) Supply - 2300 - 2320 hrs day
महजिजषटर Maharashtra Three-Phase Supply(Irrigation)- 9 hrs day
Three-Phase (Mixed) Supply - 24 hrs day
Three-Phase Supply(Irrigation)- 9 hrs day
Three-Phase (Mixed) Supply - 24 hrs day
गोवज Goa No restriction No restriction
दकषकषणी कषतर Southern Region
आनधर परिश Andhra Pradesh 07 hrsday 07 hrsday
तलगजनज Telangana 24 hoursday 24 hoursday
कनजाटक Karnataka 6 hrsday 6 hrsday
किल Kerala No Restrictions No Restrictions
तममल नजड Tamil Nadu 9 hrsday (6 hrs during day time and 3 hrs during night time) 9 hrsday (6 hrs during day time and 3 hrs during night time)
पडचिी Puducherry No Restrictions No Restrictions
परवी कषतर Eastern Region
बबहजि Bihar About 18 hrsday About 18 hrsday
झजिखणड Jharkhand About 20 hrsday About 20 hrsday
ओडडशज Odisha 24 hrsday 24 hrsday
पशशचम बगजल West Bengal About 23 hrsday About 23 hrsday
28
अकटबर 2018 कषि कषतर को षिदयत आपरति का षििरण Power Supply to Agricultural Sector during October2018
राजय कषतर State Regionऔसत वरवदयत आपरतण घनरो म Average Hours of Supply
On segregated feeders
File NoCEA-CH-14-1142018-Coordination Division
SNo Contents Page
1 Growth of Installed Capacity since 6th Plan 29
2 Progress of Transmission Sector since 6th Plan 30
3 All India Yearly Coal consumption for Power Generation (Utilities)
4 All India Annual Per Capita Consumption of Electricity since -2006
5 Average cost of power supply amp Average realisation (Paisakwh)
6 Growth of Rural Electrification amp Pump Sets Energisation
7 Status of Hydro Schemes Cleared by the CEA in Oct-2018
Section G - Growth of Power Sector
31
32
File NoCEA-CH-14-1142018-Coordination Division
(In MW)
Coal Gas Diesel Total
End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472
End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634
End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537
End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596
End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921
End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703
End of 12th Plan 19216288 2532938 83763 21832988 6780 4447842 50018 31960630
Up to Oct-2018 19599250 2493722 837629 22176734 6780 4548742 7201281 34604757
Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-17) = 51529 MW
Electricity Generation (MU) Targets and Achievements for 2016-17
Coal Gas Diesel Nuclear Hydro Res Total
1959925 2493722 837629 678000 454874 72012805 22925174
29
1 Growth of Installed Capacity Since 6th Plan
Plan YearThermal
Nuclear Hydro RES (MNRE) Total
Total Installed Capacity 34604757 MW
Coal Gas Diesel Nuclear Hydro Res
File NoCEA-CH-14-1142018-Coordination Division
Progress of Transmission Sector in the Country up to Oct 2018
1 TRANSMISSION LINES (All fig in CKM)
At the end of
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
6th plan 0 0 0 0 0 0 0 0 0 0 0 0 1831 4198 0 6029 1641 44364 0 46005 3472 48562 0 52034
7th plan 0 0 0 0 0 0 0 0 0 0 0 0 13068 6756 0 19824 4560 55071 0 59631 17628 61827 0 79455
8th plan 0 0 0 0 1634 0 0 1634 0 0 0 0 23001 13141 0 36142 6564 73036 0 79600 31199 86177 0 117376
9th plan 0 0 0 0 3234 1504 0 4738 751 409 0 1160 29345 20033 0 49378 8687 88306 0 96993 42017 110252 0 152269
10th plan 0 0 0 0 4368 1504 0 5872 1775 409 0 2184 48708 24730 0 73438 9444 105185 0 114629 64295 131828 0 196123
11th Plan 0 0 0 0 5948 1504 1980 9432 4839 411 0 5250 71023 30191 5605 106819 10140 125010 830 135980 91950 157116 8415 257481
12th Plan 6124 0 0 6124 5948 1504 1980 9432 25465 1177 4598 31240 92482 48240 17065 157787 11014 151276 978 163268 141033 202197 24621 367851
13th Plan (Up
to Mar2018)6124 0 0 6124 5948 1504 1980 9432 28666 1512 4881 35059 98247 54286 19067 171600 11258 156497 1000 168755 150243 213799 26928 390970
13th Plan (Up
to Sep-18)6124 0 0 6124 5948 1504 1980 9432 30952 1512 5059 37523 99683 56069 20662 176414 11318 160958 1000 173276 154025 220043 28701 402769
27150
75050
47900
118050
90650
30
IR addition in 12th Plan (up to
March 2017)
Total IR (up to Oct-18)
IR at the end of 11th Plan
IR at the end of 12th Plan
Envisaged IR Capacity at the end
of 13th Plan
Grand Total
Note - The figure upto the end of 10th plan in for stringing progress including the lines not commissioned Now only commissioned lines are reckoned Accordingly the figure for 10th plan (end) may read as 187555 after adjusting with (-) 10852 Ckm
Inter-regional Power Transfer Capacity
plusmn 800 kV HVDC plusmn 500 kV HVDC 765 kV 400 kV 220 kV
File NoCEA-CH-14-1142018-Coordination Division
2004-05 27800
2005-06 28100
2006-07 30200
2007-08 33000
2008-09 35500
2009-10 36700
2010-11 38700
2011-12 41756
2012-13 45460
2013-14 48940
2014-15 53040
2015-16 54590
2016-17 57430
2017-18 60800
Year
2005-06
2006-07
2007-08
2008-09
2009-10
2010-11
2011-12
2012-13
2013-14
2014-15
2015-16
2016-17
2017-18
2004-05 254 209 7568
2005-06 260 221 7636
2006-07 276 227 7423
2007-08 293 239 7727
2008-09 340 263 8713
2009-10 355 268 8870
2010-11 398 303 11975
2011-12 455 330 13514
2012-13 501 376 14867
2013-14 518 175
2014-15 520
6719
7171
3 All India yearly Coal Consumption for Power Generation (Utilities)
YEARCoal Consumption
Million Tonnes
4 All India Annual per Capita consumption of Electricity Since 2006
Per Capita Consumption ( kWh)
6314
(GrossGen+ Net Import) Mid-year population
5 Average cost of power supply amp average realization ( paiseKWH )
Yearcost of supply
(paiseunit)
Realization(paiseunit)
Including AgricultureOnly
Agriculture
1149
7335
7786
91441
8188
88363
957
1010
1075
1122
File NoCEA-CH-14-1142018-Coordination Division
Source- PFC Reports on the performance of State Power Utilities 31
File NoCEA-CH-14-1142018-Coordination Division
Sl
NoExecuting Agency
Installed
Capacity (MW)Cost (Rs crore)
Date of
Clearance
32
No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification
since 2004-05
65291374575 296361511th Plan
Cumu upto End of 11th Plan
596556 21212860
557439Cummulative up to end of 12th Plan
46708
18423975
499150
2003-042004-05
5743
9769
Cumu upto End of 10th Plan
010407 to 310308
010410 to 310311557976840909
010411 to 310312
412667
86293726
3207
482864
12632
1576036
4451722594
15455554
2314176
397343611750
2093311060316074
65109527813884
6 Growth Of Rural Electrification amp Pumpsets Energisation
Plan Year
9th Plan2002-03
134092626
4111
Pump Sets Energised Villages Electricfied (Nos)
2001-02
284064367244
1218
27801997-981998-991999-002000-01
297594
010408 to 310309010409 to 310310
10th Plan
2005-062006-07
322968331020
Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as
Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received
from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made
available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified
villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is
independent of the earlier published reports
No Hydro Electric Project has been issued concurrenceAppraisal letter by CEA during October 2018
7 Status of Hydro Schemes Cleared by the CEA in Oct-2018
Name of Scheme
File NoCEA-CH-14-1142018-Coordination Division
SN Contents Page
1 Rate of sale of power for the year 2016-17 33-41
RATE OF SALE OF POWER FOR THE YEAR 2016-17
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) NORTHERN REGION
CENTRAL SECTOR
BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 18000 66900 19800
CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 54000 222400 21600
CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 30000 144400 19600
CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 23100 91700 42600
PARBATI - III HPS NHPC LTD HYDRO-HYDRO 52000 68200 54800
DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 28000 95600 30000
CHUTAK NHPC LTD HYDRO-HYDRO 4400 22000 79800
DULHASTI HPS NHPC LTD HYDRO-HYDRO 39000 228000 56400
SALAL HPS NHPC LTD HYDRO-HYDRO 69000 342300 11000
TANAKPUR HPS NHPC LTD HYDRO-HYDRO 9420 43000 29600
URI HPS -I NHPC LTD HYDRO-HYDRO 48000 280300 16000
URI HPS - II NHPC LTD HYDRO-HYDRO 24000 147300 48600
NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 4500 24600 88200
SEWA - II NHPC LTD HYDRO-HYDRO 12000 47100 43400
ANTA CCPP NTPC LTD THERMAL-GASN 41930 67539 32400
AURAIYA CCPP NTPC LTD THERMAL-GASN 66336 53501 39100
BADARPUR TPS NTPC LTD THERMAL-COAL 70500 159153 44800
DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 84000 296170 42300
DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 98000 526686 46300
DADRI CCPP NTPC LTD THERMAL-GASHSD 82978 227469 33000
FARIDABAD CCPP NTPC LTD THERMAL-GASN 43159 115577 30800
RIHAND STPS I NTPC LTD THERMAL-COAL 100000 596766 24500
RIHAND STPS II NTPC LTD THERMAL-COAL 100000 737069 24600
RIHAND STPS III NTPC LTD THERMAL-COAL 100000 706546 30600
SINGRAULI STPS NTPC LTD THERMAL-COAL 200000 1394068 20400
TANDA TPS NTPC LTD THERMAL-COAL 44000 295438 40800
UNCHAHAR TPS I NTPC LTD THERMAL-COAL 42000 256454 39800
UNCHAHAR TPS II NTPC LTD THERMAL-COAL 42000 273577 38900
UNCHAHAR TPS III NTPC LTD THERMAL-COAL 21000 142780 43000
KOLDAM NTPC LTD HYDRO-HYDRO 80000 363260 43600
NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 303575 25841
RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 108000 668677 35374
NJHPS SJVNL HYDRO-HYDRO 150000 699496 23820
RAMPUR HPS SJVNL HYDRO-HYDRO 41202 195982 32260
TEHRI HPP THDC HYDRO-HYDRO 100000 272543 51800
KOTESHWAR HEP THDC HYDRO-HYDRO 40000 106244 53400
IGSTPS JHAJJAR ARAVALI P CPL THERMAL-COAL 150000 510429 49490
NEYVELI BARSINGSAR NEYVELI LIG CORP LTD THERMAL-LIG 25000 127520 38040
STATE SECTOR
PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 21000 14222 48200
PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 21000 19205 48400
PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 25000 102257 42600
PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 25000 62107 41800
DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 60000 312213 41000
RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 120000 35767442200
WYC HYDEL STATION HPGCL HYDRO-HYDRO 6240 20365 24900
GIRI POWER HOUSE HPSEB HYDRO-HYDRO 6000 13958 7600
ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 1695 5467 11900
BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 12000 18528 6700
GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 2250 7462 22500
BASSI POWER HOUSE HPSEB HYDRO-HYDRO 6600 29649 7500
BINWA POWER HOUSE HPSEB HYDRO-HYDRO 600 2749 19300
ANNEXURE-I
RATE OF SALE OF POWER FOR THE YEAR 2016-2017
Page 33
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) GAJ POWER HOUSE HPSEB HYDRO-HYDRO 1050 2914 26700
BANER POWER HOUSE HPSEB HYDRO-HYDRO 1200 2864 16200
HOLI POWER HOUSE HPSEB HYDRO-HYDRO 300 616 22500
THIROT POWER HOUSE HPSEB HYDRO-HYDRO 450 1126 22500
KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 1200 3064 22500
LARJI POWER HOUSE HPSEB HYDRO-HYDRO 12600 53677 23700
NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 250 750 31000
CHABA POWER HOUSE HPSEB HYDRO-HYDRO 175 465 23300
RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 150 101 13400
SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 200 000 22500
KILLAR HPSEB HYDRO-HYDRO 030 050 22500
BHABA AUGUMENP H HPSEB HYDRO-HYDRO 450 1276 22500
BS CHAMBA HPSEB HYDRO-HYDRO 045 099 19500
GUMMA HPSEB HYDRO-HYDRO 300 423 22500
GAS TURBINE POWER STATION IPGCL THERMAL-GAS 27000 67233 39300
PPS-I PPCL THERMAL-GAS 33000 175905 38300
PPS-III PPCL THERMAL-GAS 137120 196879 36100
LOWER JHELUM JampKPDD HYDRO-HYDRO 10500 60214 5100
UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 2260 10514 6300
UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 10500 44202 8500
GANDHARBAL JampKPDD HYDRO-HYDRO 1500 8925 4700
KARNAH MPH JampKPDD HYDRO-HYDRO 200 1122 31000
CHENANI I JampKPDD HYDRO-HYDRO 2330 10892 6600
CHENANI II JampKPDD HYDRO-HYDRO 200 1188 9300
CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 750 3634 14200
IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 375 2108 18500
IGO MERCHELLONG JampKPDD HYDRO-HYDRO 300 1572 29700
PAHALGAM MHP JampKPDD HYDRO-HYDRO 450 1713 32900
MARPACHOO JampKPDD HYDRO-HYDRO 075 375 29800
HAFTAL JampKPDD HYDRO-HYDRO 100 483 28700
SANJAK JampKPDD HYDRO-HYDRO 126 441 36000
SEWA-III JampKPDD HYDRO-HYDRO 900 3273 20200
BHADERWAH JampKPDD HYDRO-HYDRO 150 935 8900
BAZGO JampKPDD HYDRO-HYDRO 030 108 33300
SUMOOR JampKPDD HYDRO-HYDRO 010 045 35400
HUNDER JampKPDD HYDRO-HYDRO 040 176 26200
STAKNA JampKPDD HYDRO-HYDRO 400 1933 4100
KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 124000 662879 31360
SURATGARH TPS RRVUNL THERMAL-COAL 150000 402328 41730
CHHABRA TPS 1amp 2 RRVUNL THERMAL-COAL 50000 305946 36700
CHHABRA TPS 3 RRVUNL THERMAL-COAL 25000 151536 36700
CHHABRA TPS 4 RRVUNL THERMAL-COAL 25000 155896 36700
RAMGARH GT POWER PROJECT RRVUNL THERMAL-COAL 22050 43177 41800
RAMGARH GAS T P PROJECT 3 RRVUNL THERMAL-GAS 5000 93615 41800
DHOLPUR C C POWER PROJECT RRVUNL THERMAL-R-LNG 33000 9486 46110
MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 14000 20855 34192
MINI MICRO HYDEL (MMH) P S RRVUNL HYDRO-HYDRO 2385 851 37800
KALISINDH TPP 1 RRVUNL THERMAL-COAL 60000 341543 45000
KALISINDH TPP 2 RRVUNL THERMAL-COAL 60000 211588 45000
KHARA HEP UPJVNL HYDRO-HYDRO 7200 26654 7200
MATATILLA HEP UPJVNL HYDRO-HYDRO 3060 12219 6500
OBRA HEP UPJVNL HYDRO-HYDRO 9900 21517 6300
RIHAND UPJVNL HYDRO-HYDRO 30000 57369 5500
ANPARA A TPS UPRVUNL THERMAL-COAL 63000 317536 27000
ANPARA B TPS UPRVUNL THERMAL-COAL 100000 705605 22700
ANPARA D UPRVUNL THERMAL-COAL 100000 300158 39800
HARDUAGANJ TPS UPRVUNL THERMAL-COAL 16500 45817 49200
HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 50000 304389 46600
OBRA A TPS UPRVUNL THERMAL-COAL 28800 13158 34000
OBRA B TPS UPRVUNL THERMAL-COAL 100000 328124 21900
Page 34
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) PANKI TPS UPRVUNL THERMAL-COAL 21000 66488 50300
PARICHHA TPS UPRVUNL THERMAL-COAL 22000 38762 49400
PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 42000 231931 45600
PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 50000 276722 50400
CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 24000 70845 8290
CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 14400 75366 8390
DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 3375 9595 12080
DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 5100 18701 10520
KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4140 17359 12330
KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 12000 33001 9420
KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 3000 11953 8320
TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 9000 33983 12460
MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 30400 124510 16110
RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 19800 17897 10550
MPUR UTTARAKHAND JVNL HYDRO-HYDRO 930 5121 19200
PATHRI UTTARAKHAND JVNL HYDRO-HYDRO 2040 11636 14200
GALOGI UTTARAKHAND JVNL HYDRO-HYDRO 300 648 12500
PRIVATE SECTOR
MGTPP CLP INDIA PVT LTD THERMAL-COAL 132000 268902 41940
SHRINAGAR HEP ALAKNANDA HPCL HYDRO-HYDRO 33000 127414 48800
GAMA INFRAPROP CCPP GAMA INFRAPROP PVT THERMAL-GAS 22500 52686 47000
PPGCL (BARA) JP POWER VENTURES LTD THERMAL-COAL 198000 448200 38500
MALANA HEP MALANA PCL HYDRO-HYDRO 8600 26354 29792
MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 10000 30369 32580
ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 19200 56347 36079
KASHANG HEP H P PCL HYDRO-HYDRO 19500 5034 29200
BASPA-II HEP HBPCL HYDRO-HYDRO 30000 132769 13600
KARCHAM WANGTOO HEP HBPCL HYDRO-HYDRO 100000 434386 36600
RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 108000 582600 43700
RITHALA COMBI CY POWER PLANT TATA POWER DDL THERMAL-GAS 9480 000 11900
RAJPURA TPS NABHA POWER LTD THERMAL-GAS 140000 901484 39000
TALWANDI SABO POWER LTD TALWANDI SABO POWER LTD THERMAL-COAL 198000 636040 49548
ROJA THERMAL POWER STATION ROJA POWER SCL THERMAL-COAL 120000 727200 43400
KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 34400 63400
BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 36000 62600
MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 38200 60800
UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 37900 61500
KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 42300 58800
LALITPUR PGCL BAJAJ ENERGY PVT LTD THERMAL-COAL 198000 359400 47300
PRAYAGRAJ PGCL PRAYAGRAJ PGCL THERMAL-COAL 132000 448200 38595
KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 132000 783182 33438
WESTERN REGION
CENTRAL SECTOR
INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 100000 325333 23892
OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 52000 141663 34001
GANDHAR CCPP NTPC LTD THERMAL-GAS 65739 221924 28700
KAWAS CCPP NTPC LTD THERMAL-GASN 65620 167929 27000
KORBA I amp II NTPC LTD THERMAL-COAL 210000 1499171 20500
KORBA III NTPC LTD THERMAL-COAL 50000 358746 26600
SIPAT STPS I NTPC LTD THERMAL-COAL 198000 1479902 26800
SIPAT STPS II NTPC LTD THERMAL-COAL 100000 766549 26500
VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 126000 693142 25800
VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 100000 608781 23800
VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 100000 673475 27600
VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 100000 655924 32900
VINDHYACHAL STPS V NTPC LTD THERMAL-COAL 50000 328265 31700
MOUDA I NTPC LTD THERMAL-COAL 100000 343130 44500
MOUDA Ii NTPC LTD THERMAL-COAL 66000 40637 39900
RATNAGIRI GAS amp POWER PVT LTD RGPPL THERMAL-GAS 196708 442485 47000
KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 000 24729
TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 32000 201227 10740
Page 35
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 365122 19069
TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 787444 29324
STATE SECTOR
GSEG-HAZIRA15610 MW GUJARAT S ENEGEN LTD THERMAL-GAS 15610 1805 28200
GSEG-HAZIRA35143 MW GUJARAT S ENEGEN LTD THERMAL-GAS 35130 22276 51300
GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 21978 51800
AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 13929 26100
KORBA TPS EAST CSPGCL THERMAL-COAL 44000 198673 33880
DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 365808 27570
KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 316500 30420
HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 532878 19410
CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 515 58300
MTTPS CHAMPA U-I CSPGCL THERMAL-COAL 50000 220376 39000
MTTPS CHAMPA U-II CSPGCL THERMAL-COAL 50000 23709 10000
SHP GANGREL CSPGCL HYDRO-HYDRO 1000 2350 36790
BANGO HEP CSPGCL HYDRO-HYDRO 12000 14662 8900
MHP KORBA WEST CSPGCL HYDRO-HYDRO 170 859 38190
SIKASAR HEP CSPGCL HYDRO-HYDRO 700 418 26870
DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8843 74500
DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 19446 51500
GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 66388 71600
GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127488 41300
KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 96072 43900
KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 29841 56400
SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 184966 58800
UKAI 1-5 GSECL THERMAL-COAL 85000 204891 46900
UKAI TPS 6 GSECL THERMAL-COAL 50000 284448 48200
WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 271999 58300
WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 82808 44100
KADANA HPS GSECL HYDRO-HYDRO 24200 34433 16800
UKAI HPS GSECL HYDRO-HYDRO 30500 40585 6100
TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 123000 11500
BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 8900 10900
BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 7200 27500
JHINNA HPS MPPGCL HYDRO-HYDRO 2000 9700 18500
RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 44300 3400
GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 17300 4600
SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 4100 16900
MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 14600 27000
PENCH HPS MPPGCL HYDRO-HYDRO 16000 23700 8100
RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 3000 16900
AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 134400 35100
SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 283800 38700
SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 344600 34300
SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 111600 61600
SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 211800 58000
SSTPS PH-I MPPGCL THERMAL-COAL 120000 233100 84300
BHUSAWAL TPS MSPGCL THERMAL-COAL 142000 566258 51100
CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1365682 33700
KHAPERKHEDA MSPGCL THERMAL-COAL 134000 706207 39100
KORADI TPS MSPGCL THERMAL-COAL 62000 443206 42000
NASIK TPS MSPGCL THERMAL-COAL 63000 297275 47000
PARLI TPS MSPGCL THERMAL-COAL 113000 175934 71600
PARAS MSPGCL THERMAL-COAL 50000 267931 38700
URAN CCPP MSPGCL THERMAL-GAS 67200 320330 30600
KOYANA MSPGCL HYDRO-HYDRO 195600 328155 13100
SMALL HYDRO POWER PLANTS MSPGCL HYDRO-HYDRO 45400 93062 30500
BHIRA MSPGCL HYDRO-HYDRO 8000 10046 8400
TILLARI MSPGCL HYDRO-HYDRO 8900 10584 3100
SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 233298 20500
SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 87633 20500
PRIVATE SECTOR
Page 36
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 81282 46750
JNSTPP(JAYPEE NIGRIE) JP POWER VENTURES LTD THERMAL-COAL 132000 726695 29310
MB POWER MB POWER THERMAL-COAL 120000 345632 38310
ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 754922 28671
ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 780761 23495
ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 198000 1263784 32090
ADANI POWER MAHARA ADANI POWER LTD THERMAL-COAL 330000 1666191 34124
AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 170065 36827
SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 252035 45129
ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 458551 36000
ESSAR POWER MP LTD ESSAR POWER MP LTD THERMAL-COAL 60000 243040 28600
VEDANTA LTD (P P -I) VEDANTA LTD THERMAL-GAS 3000 15044 24000
VEDANTA LTD (P P -II) VEDANTA LTD THERMAL-GAS 3000 21293 24000
PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 8234600 24000
165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 5850 64390
145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 68717 40349
SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 132655 28776
SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 144686 38567
MUNDRA UMPPCOASTAL GUJARAT POWER
LTD THERMAL-IMP COAL 400000 2530300
23900
LANCO AMARKANTAK TPP PATHADIH
U-ILANCO AMARKAN POWER LTD THERMAL-COAL 30000 195500
29200
LANCO AMARKANTAK TPP PATHADIH
U-IILANCO AMARKAN POWER LTD THERMAL-COAL 30000 206900
27600
BARADARHA TPS D B POWER LTD THERMAL-COAL 120000 677373 29200
JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 405000 28900
JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 453000 40500
DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 339437 40700
TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 293400 44000
TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 137200 37000
TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 174900 44000
BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 92900 14100
BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23700 34300
KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 27600 48300
CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2530300 23900
BHANDARDRA HEP -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 2475 54900
SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 161400 26500
SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 445000 39000
SOTHERN REGION
CENTRAL SECTOR
NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 325699 54820
NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 305532 39880
NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 998805 38510
NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 113016 54070
NEYVELI TAMILNADU POWER LTD JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 625274 42200
VALLUR TPS NTPC TECL THERMAL-COAL 150000 856438 42350
R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 1493 84300
RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1502919 29400
RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 341291 31800
SIMHADRI I NTPC LTD THERMAL-COAL 100000 688382 36800
SIMHADRI II NTPC LTD THERMAL-COAL 100000 663657 43400
KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 593110 31324
MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 291625 21764
KKNPP-1 amp 2 NPCIL NUCLEAR-NUCLEAR 200000 572609 40948
MINICOY LAKSHADEEP THERMAL-DIESEL 340 770 29600
KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1097 29600
AMINI LAKSHADEEP THERMAL-DIESEL 265 509 29600
ANDROTT LAKSHADEEP THERMAL-DIESEL 219 524 29600
KALPENI LAKSHADEEP THERMAL-DIESEL 175 356 29600
AGATTI LAKSHADEEP THERMAL-DIESEL 195 658 29600
KADMAT LAKSHADEEP THERMAL-DIESEL 190 414 29600
KILTAN LAKSHADEEP THERMAL-DIESEL 150 269 29600
CHETLET LAKSHADEEP THERMAL-DIESEL 100 139 29600
BITRA LAKSHADEEP THERMAL-DIESEL 043 024 29600
BANGARAM LAKSHADEEP THERMAL-DIESEL 018 009 29600
Page 37
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) STATE SECTOR
Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 721811 46500
Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 50000 336142 46500
RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 237358 46500
RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 239926 46500
RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 124500 46500
SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 62109 46500
UPPER SILERU APGENCO HYDRO-HYDRO 24000 33000 46500
LOWER SILERU APGENCO HYDRO-HYDRO 46000 81066 46500
DONKARAI APGENCO HYDRO-HYDRO 2500 6007 46500
PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 1262 46500
CHETTIPETA APGENCO HYDRO-HYDRO 100 214 46500
MUCHKUND APGENCO HYDRO-HYDRO 12000 37571 46500
NAGARJUNASAGAR RCPH APGENCO HYDRO-HYDRO 9000 606 46500
TUNGABHADRA HES amp HAMPI(AP
Share)
APGENCO HYDRO-HYDRO 7200 6100 46500
KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 352232 42600
KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 288131 32500
KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 319272 46500
RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 40073 44300
KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 308317 46000
KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 308963 51300
SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 61004 76600
NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 17960 75300
PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 20873 58300
POCHAMPAD-I TSPGENCO HYDRO-HYDRO 2700 5455 29800
POCHAMPAD-II TSPGENCO HYDRO-HYDRO 900 1932 40700
NIZAMSAGAR TSPGENCO HYDRO-HYDRO 1000 1126 53400
RAICHUR TPS 1 to 7 KPCL THERMAL-COAL 147000 890866 43800
RAICHUR TPS 8 KPCL THERMAL-COAL 25000 159523 48200
BELLARI TPS 1 KPCL THERMAL-COAL 50000 318679 51100
BELLARI TPS 2 KPCL THERMAL-COAL 50000 232347 55600
BELLARI TPS 3 KPCL THERMAL-COAL 70000 47565 34400
BHADRA PH KPCL HYDRO-HYDRO 3920 2369 45900
GERUSUPPA PH KPCL HYDRO-HYDRO 24000 26990 22000
GHAT PRABHA HEP KPCL HYDRO-HYDRO 3200 4777 25300
KADRA HPS KPCL HYDRO-HYDRO 15000 16889 26800
NAGJHARI KPCL HYDRO-HYDRO 90000 155159 9800
KODASALLI DPH KPCL HYDRO-HYDRO 12000 14854 19200
MUNIRA+MGH+SPH+SPH KPCL HYDRO-HYDRO 22640 48211 7900
SHARAVATHY HPS KPCL HYDRO-HYDRO 108550 276215 5400
ALMATTI DPH KPCL HYDRO-HYDRO 29000 39611 24600
VARAHI UGPH KPCL HYDRO-HYDRO 46000 71368 15600
IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 17196 15300
IDUKKI HPS KSEB HYDRO-HYDRO 78000 137905 15300
KAKKAD HPS KSEB HYDRO-HYDRO 5000 13063 15300
KALLADA HPS KSEB HYDRO-HYDRO 1500 4436 15300
KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 46544 15300
KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 635 15300
LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 30822 15300
MALANKARA HPS KSEB HYDRO-HYDRO 1050 2474 15300
MATTUPETTY KSEB HYDRO-HYDRO 200 230 15300
MALAMPUZHA KSEB HYDRO-HYDRO 250 063 15300
CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 864 15300
URUMI ST I amp II KSEB HYDRO-HYDRO 615 903 15300
LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 248 15300
NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7765 19625 15300
PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 16601 15300
PANNIAR HPS KSEB HYDRO-HYDRO 3240 6217 15300
PORINGALKUTHU KSEB HYDRO-HYDRO 3600 10052 15300
PORINGALKUTHU LBE KSEB HYDRO-HYDRO 1600 9438 15300
PEPPARA KSEB HYDRO-HYDRO 300 395 15300
POOZHITHODE KSEB HYDRO-HYDRO 480 1045 15300
Page 38
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) PEECHI KSEB HYDRO-HYDRO 125 040 15300
RANI-PERUNADU KSEB HYDRO-HYDRO 400 585 15300
SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 79783 15300
SENGULAM HPS KSEB HYDRO-HYDRO 5120 11558 15300
SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 16711 15300
VILANGAD KSEB HYDRO-HYDRO 750 1578 15300
BARAPOLE KSEB HYDRO-HYDRO 1500 1932 15300
VELLATHOOVAL KSEB HYDRO-HYDRO 360 305 15300
CHIM0NY KSEB HYDRO-HYDRO 250 156 15300
ADYANPARA KSEB HYDRO-HYDRO 350 501 15300
BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 554 15300
KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 3801 15300
KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 23132 32800
ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 14416 62280
METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 523970 62280
METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 321270 62280
NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 336575 62280
NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 591240 62280
TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 508966 62280
KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 30897 62280
VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 18720 90699 62280
KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 33593 62280
BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 1047 62280
PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 1250 62280
PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 330 62280
MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 4897 62280
MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 032 62280
KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15681 62280
KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 40608 62280
KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 21342 62280
KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 4717 62280
KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4322 62280
KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2399 62280
METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 4416 62280
METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 8035 62280
BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2187 62280
BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2359 62280
BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2511 62280
BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 1949 62280
BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 1819 62280
POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 172 62280
SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 241 62280
MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 026 62280
THIRUMOORTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 136 62280
PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 9309 62280
VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 353 62280
SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 4192 62280
PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 6571 62280
SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 1186 62280
SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6319 62280
ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 6122 62280
KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 28674 62280
SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 18381 62280
SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 4258 62280
KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 12680 62280
KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4201 62280
ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 000 62280
PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 19175 62280
AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 078 62280
BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 504 62280
BHAVANI KATTALAI (BKB)(IIIampIII BB I amp II)TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 5847 62280
PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 000 62280
Page 39
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) SRI DAMODARAM STPS APPDCL THERMAL-COAL 160000 808108 36300
PRIVATE SECTOR
KARUPPUR TANJORE LANCO TANJORE PCL THERMAL-GAS 12000 48096 28770
SIMHAPURI ENERGY LTD SIMHAPURI ENERGY LTD THERMAL-COAL 60000 143900 39100
JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 7111 45500
SBU 1 JSW ENERGY LTD
VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 26000 159100
43300
SBU 2 JSW ENERGY LTD
VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 60000 247900
42800
LANCO KPLLANCO KONDAPALLI POWER
LTDTHERMAL-GAS 36814 85060
25776
LANCO KPL STG -IILANCO KONDAPALLI POWER
LTDTHERMAL-GAS 36600 12979
46330
LANCO KPL STG -IIIALANCO KONDAPALLI POWER
LTDTHERMAL-GAS 37100 85710
46330
LANCO KPL STG -III BLANCO KONDAPALLI POWER
LTDTHERMAL-GAS 37100 43639
46330
HINDUJA NATIONAL PCL HINDUJA NATIONAL PCL THERMAL-COAL 104000 303000 38200
MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 121164 49940
UDUPI POWER COR LTD ADANI POWER LTD THERMAL-COAL 120000 754613 42500
SPECTRUM POWER GENERATION
LTD SPECTRUM PG LTD THERMAL-GASN 20525 9256812
34952
TAQA NEYVELI POWER COM PVT
LTD TAQA NEYVELI THERMAL-LIG 25000 5840
34500
ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 251000 51000
ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 207860 36800
GMR VEMAGIRI POWER GENERATION
LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 30117
46450
EASTERN REGION
CENTRAL SECTOR
MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 64675 53113
MTPS STAGE - II KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 39000 1432 69138
BOKARO `B` TPS DVC THERMAL-COAL 63000 145670 31539
MEJIA TPS U 1-3 DVC THERMAL-COAL 63000 348298 31552
MEJIA TPS U 4 DVC THERMAL-COAL 21000 116099 34997
MEJIA TPS U 5-6 DVC THERMAL-COAL 50000 276427 35976
MEJIA TPS U 7-8 DVC THERMAL-COAL 100000 552854 36991
DURGAPUR STEEL TPS DVC THERMAL-COAL 100000 665550 39323
DURGAPUR TPS DVC THERMAL-COAL 21000 59270 35416
RAGHUNATHPUR TPS DVC THERMAL-COAL 120000 201650 35326
MAITHON HYDEL STA DVC HYDRO-HYDRO 6320 12200 17984
CHANDRAPURA TPSU1-3 DVC THERMAL-COAL 42000 257610 35095
CHANDRAPURA TPSU7-8 DVC THERMAL-COAL 50000 306673 34987
KODERMA TPS DVC THERMAL-COAL 100000 380180 38131
PANCHET HPS DVC HYDRO-HYDRO 8000 13360 17984
TILLAYA HPS DVC HYDRO-HYDRO 400 1410 17984
RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34700 35400
TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 277300 23200
TLDP -III NHPC LTD HYDRO-HYDRO 13200 55400 62000
TLDP -IV NHPC LTD HYDRO-HYDRO 16000 60300 25600
FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 957219 33700
FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 308943 41000
BONGAINGAON TPS NTPC LTD THERMAL-COAL 25000 153663 58600
KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 542277 34200
KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 942591 34200
BARH-II NTPC LTD THERMAL-COAL 132000 728021 44500
TALCHER TPS NTPC LTD THERMAL-COAL 46000 335521 30100
TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 702319 25600
TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1436521 24700
STATE SECTOR
BTPS(RampM) BIHAR STATE PGCL THERMAL-COAL 22000 12142 39700
BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 98331 10602
HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 50593 9482
CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 19689 2605
RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 53192 6033
UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 147208 14637
Page 40
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 60353 4519
IB TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 288567 25000
J P H GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 210 038 61100
MEYONG CHU GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 400 1086 61100
TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 122667 38200
DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 214339 43321
KOLAGHAT THERMAL POWER
STATION
WEST BENGAL PDCL THERMAL-COAL 126000 538269 31603
BAKRESHWAR THERMAL POWER
PLANT
WEST BENGAL PDCL THERMAL-COAL 105000 634876 32154
BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 45000 166855 33299
SANTHALDIH THERMAL POWER
STATION
WEST BENGAL PDCL THERMAL-COAL 50000 336442 34932
SAGARDIGHI THERMAL POWER
PROJECT
WEST BENGAL PDCL THERMAL-COAL 160000 423121 34705
JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 20344 68900
RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 24559 68900
TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 4623 68900
PURULIA PUMPED STORAGE
PROJECT
WEST BENGAL SEDCL HYDRO-HYDRO 90000 108816 68900
MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2768 68900
PRIVATE SECTOR
CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 49474 20230
CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 555500 70200
HALDIA ENERGY HALDIA ENERGY LTD THERMAL-COAL 60000 371000 50400
DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3688 63400
KAMALANGA TPS GMR KAMALANGA ENERGY LTD THERMAL-COAL 105000547670
33300
ADHUNIK POWER U-1 ADHUNIK POWER THERMAL-COAL 27000 158 44060
ADHUNIK POWER U-2 ADHUNIK POWER THERMAL-COAL 27000 168 44250
VL-JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 332800 23622
JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 43000 45250
JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 71700 37030
JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 70700 35920
JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 71100 38870
JOJOBERA UNIT 5 TATA POWER COM LTD THERMAL-COAL 12000 79300 44560
JOJOBERA UNIT 6 TATA POWER COM LTD THERMAL-WHR 12000 83700 12840
IEL KALINGANAGAR U-I TATA POWER COM LTD THERMAL-WG 6750 33400 22500
IEL KALINGANAGAR U-II TATA POWER COM LTD THERMAL-WG 6750 34800 22500
MAITHON UNIT 1 amp 2 TATA POWER COM LTD THERMAL-COAL 105000 678000 36100
HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 27500 24340
HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 28400 24340
HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 15800 24310
NORTH EASTERN REGION
CENTRAL SECTOR
LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 74100 36600
AGARTALA GT NEEPCO THERMAL-GAS 13500 88611 27210
ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 153111 32310
DOYANG HEP NEEPCO HYDRO-HYDRO 7500 25598 49801
KOPILI HEP NEEPCO HYDRO-HYDRO 20000 98186 11491
KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 19582 20237
KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 10310 17968
RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 124093 22945
TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 10100 17344 39000
STATE SECTOR
HYDRO POWER (122 Stns) ITANAGAR GOVT OF ARUNACHAL
PRADESHHYDRO-HYDRO 6971 6217270
24600
KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39514 17337
LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 82327 36810
NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 33318 48290
MYNTRIANG SHEP ST II ASSAM POWER GENCO HYDRO-HYDRO 300 567 35776
LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 9130 49200
LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 012 49200
DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 022 49200
TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 000 49200
UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 4990 16000
UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 6476 37000
UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 16494 14600
UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 3600 9556 15000
SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 758 8000
MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44070 44800
KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 154 41400
TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 091 41400
MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 411 41400
MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 394 41400
KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 760 41400
SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 3264 41400
LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 044 41400
BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 18953 28000
ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 43585 28200
GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 4080 11100
Note
LIG Lignite N Naptha WHR Waste Heat Recovery
Page 41
File NoCEA-CH-14-1142018-Coordination Division
SN Contents Page
1 Capacity Addition Targets and Achievements in 12th Plan 12
2 Capacity Addition Targets amp Achievements during Oct-2018 and April 2018- Oct 2018 13
3 Installed Capacity in various Regions including their shares 14-19
Section B - Capacity Addition
File NoCEA-CH-14-1142018-Coordination Division
Figures in MW
TARGET ACH TARGET ACH TARGET ACH TARGET ACH
CENTRAL 14878 15869 6004 2584 5300 2000 26182 20453
STATE 13922 22201 1608 2276 0 0 15530 24477
PRIVATE 43540 53661 3285 619 0 0 46825 54280
ALL INDIA 72340 91730 10897 5479 5300 2000 88537 99209
Figures in MW
Thermal Hydro Nuclear Total
Target Ach Target Ach Target Ach Target Ach
Central 4880 3170 800 390 500 6180 3560 5761
State 3546 1760 300 200 0 3846 1960 5096
Private 2940 3780 205 205 0 3145 3985 12671
Total 11366 8710 1305 795 500 0 13171 9505 7217
12
2 CAPACITY ADDITION TARGET AND ACHIEVEMENT FOR 2017-18 (IN MW)
1 Capacity Addtion Targets and Achievements in the 12th Plan
SECTORTHERMAL HYDRO NUCLEAR TOTAL
File NoCEA-CH-14-1142018-Coordination Division
(MW)
Cummulative
Deviation
Target Achievement Target Achievement (+) (-)
Central 2760 250 0 250 0 -250
State 450615 1030 0 1030 69755 -960245
Private 0 0 600 0 600 600
Total 726615 1280 600 1280 669755 -610245
Central 710 0 0 110 110 0
State 130 0 0 12999 30 -9999
Private 0 0 0 0 0 0
Total 840 0 0 23999 140 -9999
Nuclear Central 0 0 0 0 0 0
Central 3470 250 0 360 110 -250
State 463615 1030 0 115999 99755 -1060235
Private 0 0 600 0 600 600
Total 810615 1280 600 151999 809755 -710235
Electricity Generation (MU) Targets and Achievements for 2016-17
13
2 Capacity Addition Targets Achievements During Oct-2018
Schemes Sector
Target 2018-19
April 2018- Oct 2018Oct-18
Hydro
All India
Capacity Addition TargetsAchievements during the Month of Oct-2018
Thermal
12
80
24
0
0
15
20
67
0
14
0
0
81
0
0
200
400
600
800
1000
1200
1400
1600
Thermal Hydro Nuclear Total
MW
Targets and Achievement during 2018-19Target Achievement
600
0 00 0
600
0
100
200
300
400
500
600
700
800
900
1000
Target Achievement
MW
Targets and Achievement during Oct 2018Thermal Hydro
Nuclear Total
File NoCEA-CH-14-1142018-Coordination Division
Coal Gas Diesel Total
State 1593400 287920 000 1881320 000 869755 68956 2820031
Private 2276083 55800 000 2331883 000 251400 1261535 3844818
Central 1258537 234406 000 1492943 162000 849622 32900 2537465
Sub Total 5128020 578126 000 5706146 162000 1970777 1363391 9202314
State 2128000 284982 000 2412982 000 544650 31119 2988751
Private 3488567 467600 000 3956167 000 48100 2005170 6009437
Central 1504295 328067 000 1832362 184000 162000 66130 2244492
Sub Total 7120862 1080649 000 8201511 184000 754750 2102418 11242679
State 1943250 79198 28788 2051236 000 1183803 52102 3287141
Private 1212450 532210 47370 1792030 000 000 3495815 5287845
Central 1422502 35958 000 1458460 332000 000 49190 1839650
Sub Total 4578202 647366 76158 5301726 332000 1183803 3597107 10414636
State 695000 10000 000 705000 000 353792 22511 1081303
Private 637500 000 000 637500 000 39900 84853 762253
Central 1387664 000 000 1387664 000 100520 1000 1489184
Sub Total 2720164 10000 000 2730164 000 494212 108364 3332740
State 000 49771 3600 53371 000 42200 25674 121245
Private 000 2450 000 2450 000 000 2571 5021
Central 52002 125360 000 177362 000 103000 500 280862
Sub Total 52002 177581 3600 233183 000 145200 28745 407128
State 000 000 4005 4005 000 000 525 4530
Private 000 000 000 000 000 000 221 221
Central 000 000 000 000 000 000 510 510
Sub Total 000 000 4005 4005 000 000 1256 5261
State 6359650 711871 36393 7107913 000 2994200 200887 10303000
Private 7614600 1058060 47370 8720030 000 339400 6850164 15909594
Central 5625000 723791 000 6348791 678000 1215142 150230 8392163
Total 19599250 2493722 83763 22176734 678000 4548742 7201281 34604757
Figures at decimal may not tally due to rounding off
Note -
(As per latest information available with MNRE)
Break up of RES all India as on 30092018 is given below (in MW)
450695 3461510 2402166 7201281
A Oct 2018 669755 MW
B Capacity Retired
during
Oct 2018 705 MW
C Oct 2018 0 MW
D Oct 2018 A-B+C -35245 MW
Share of Telangana from JEGURUPADU CCPP Ph II has been removed and the same has been added to private sector of Andhra Pradesh due to expiry of PPA as per
request from TS Transco
Region
ALL INDIA INSTALLED CAPACITY (IN MW) OF POWER STATIONS (As on 31102018)
(UTILITIES)
Net Capacity Added during
1 RES include SHP BP UampI Solar and Wind Energy Installed capacity in respect of RES (MNRE) as on 30092018
Small
Hydro PowerWind Power
Bio-PowerSolar Power
Total
CapacityBM PowerCogen Waste to Energy
2 U-1 to 7 (76995=69755 MW) of LAKWA REPLACEMENT POWER PROJECT commissioned in April 2018 but intimated in October 2018
has been added to state sector of Assam
1 Badarpur TPS (705 MW) has been retired from central sector of Northern Region
Capacity Up-rated
Ownership Sector
873080 13830
Capacity Added during
1 U-2 (600 MW) of MAHAN TPP has been commissioned and added to private sector of Madhya Pradesh
Grand TotalThermalNuclear Hydro
Islands
ALL INDIA
Abbreviation- SHP=Small Hydro Project (le 25 MW) BP=Biomass Power UampI=Urban amp Industrial Waste Power RES=Renewable Energy Sources
Northern Region
Western Region
Southern Region
Eastern Region
North Eastern
Region
RES
(MNRE)
Modewise breakup
File NoCEA-CH-14-1142018-Coordination Division
Coal Gas Diesel Total
State 13500 180040 000 193540 000 000 000 193540
Private 86922 10800 000 97722 000 000 12157 109879
Central 311272 20701 000 331973 10283 72309 000 414565
Sub-Total 411694 211541 000 623235 10283 72309 12157 717984
State 272000 15000 000 287000 000 110282 5930 403212
Private 408078 000 000 408078 000 20000 34745 462823
Central 129472 53561 000 183034 10094 66370181 500 259998
Sub-Total 809550 68561 000 878112 10094 196652 41175 1126032
State 000 000 000 000 000 69460 25661 95121
Private 000 000 000 000 000 99200 60536 159736
Central 18340 6201 000 24541 2895 122388 000 149824
Sub-Total 18340 6201 000 24541 2895 291048 86197 404681
State 000 17500 000 17500 000 123000 12903 153403
Private 000 000 000 000 000 000 5985 5985
Central 50639 12907 000 63547 6798 109188 000 179533
Sub-Total 50639 30407 000 81047 6798 232188 18888 338921
State 176000 15000 000 191000 000 259770 12780 463550
Private 511550 000 000 511550 000 28800 115462 655812
Central 85458 26401 000 111859 19681 92342 000 223882
Sub-Total 773008 41401 000 814409 19681 380912 128242 1343244
State 585000 60380 000 645380 000 109618 2385 757383
Private 388200 000 000 388200 000 10400 710680 1109280
Central 120625 22110 000 142735 55674 73901 29400 301710
Sub-Total 1093825 82490 000 1176315 55674 193919 742465 2168373
State 546900 000 000 546900 000 72410 2510 621820
Private 871433 000 000 871433 000 84200 266691 1222324
Central 379639 54949 000 434588 28948 180253 3000 646789
Sub-Total 1797972 54949 000 1852921 28948 336863 272201 2490933
State 000 000 000 000 000 125215 6787 132002
Private 9900 45000 000 54900 000 8800 52244 115944
Central 34324 6966 000 41290 3124 47554 000 91968
Sub-Total 44224 51966 000 96190 3124 181569 59031 339914
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 3035 3035
Central 3815 1503 000 5317 801 10171 000 16289
Sub-Total 3815 1503 000 5317 801 10171 3035 19324
124953 29105 000 154058 23703 75145 000 252907
State 1593400 287920 000 1881320 000 869755 68956 2820031
Private 2276083 55800 000 2331883 000 251400 1261535 3844818
Central 1258537 234406 000 1492943 162000 849622 32900 2537465
Grand Total 5128020 578126 000 5706146 162000 1970777 1363391 9202314
Uttar Pradesh
Uttarakhand
Chandigarh
Grand TotalThermalNuclear
Hydro
(Renewable)
RES
(MNRE)
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
NORTHERN REGION
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
(As on 31102018)
Central - Unallocated
Total (Northern
Region)
Delhi
Haryana
Himachal Pradesh
Jammu amp Kashmir
Punjab
Rajasthan
State Ownership Sector
Modewise breakup
File NoCEA-CH-14-1142018-Coordination Division
(As on 31102018)
Coal Gas Diesel Total
State 000 000 000 000 000 000 005 005
Private 000 4800 000 4800 000 000 091 4891
Central 45478 1967 000 47445 2600 000 000 50045
Sub-Total 45478 6767 000 52245 2600 000 096 54941
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 1301 1301
Central 12663 4334 000 16997 700 000 000 17697
Sub-Total 12663 4334 000 16997 700 000 1301 18998
State 475000 217782 000 692782 000 77200 800 770782
Private 776567 396000 000 1172567 000 000 729782 1902349
Central 309051 42400 000 351451 55900 000 23830 431181
Sub-Total 1560618 656182 000 2216800 55900 77200 754412 3104312
State 408000 000 000 408000 000 170366 8396 586762
Private 617400 10000 000 627400 000 000 378205 1005605
Central 279441 25700 000 305141 27300 152000 30000 514441
Sub-Total 1304841 35700 000 1340541 27300 322366 416601 2106808
State 228000 000 000 228000 000 12000 1105 241105
Private 849000 000 000 849000 000 000 52430 901430
Central 195344 000 000 195344 4800 10000 000 210144
Sub-Total 1272344 000 000 1272344 4800 22000 53535 1352679
State 1017000 67200 000 1084200 000 285084 20813 1390097
Private 1245600 56800 000 1302400 000 48100 842815 2193315
Central 433475 227273 000 660748 69000 000 12300 742048
Sub-Total 2696075 351273 000 3047348 69000 333184 875927 4325459
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 546 546
Central 17444 6634 000 24078 900 000 000 24978
Sub-Total 17444 6634 000 24078 900 000 546 25524
211400 19759 000 231159 22800 000 000 253959
State 2128000 284982 000 2412982 000 544650 31119 2988751
Private 3488567 467600 000 3956167 000 48100 2005170 6009437
Central 1504295 328067 000 1832362 184000 162000 66130 2244492
Grand Total 7120862 1080649 000 8201511 184000 754750 2102418 11242679
Central - Unallocated
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
WESTERN REGION
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
State Ownership Sector
Modewise breakup
Grand TotalThermalNuclear
Hydro
(Renewable)
RES
(MNRE)
Total (Western
Region)
Goa
Daman amp Diu
Gujarat
Madhya Pradesh
Chhattisgarh
Maharashtra
Dadra amp Nagar
Naveli
File NoCEA-CH-14-1142018-Coordination Division
(As on 31102018)
Coal Gas Diesel Total
State 501000 23540 000 524540 000 167360 4875 696775
Private 387388 381318 3680 772386 000 000 693073 1465459
Central 167456 000 000 167456 12727 000 25000 205183
Sub-Total 1055844 404858 3680 1464382 12727 167360 722948 2367417
State 508250 000 000 508250 000 247993 4022 760265
Private 83945 83182 000 167127 000 000 375048 542175
Central 195612 000 000 195612 14873 000 1000 211485
Sub-Total 787807 83182 000 870989 14873 247993 380070 1513925
State 502000 000 12792 514792 000 359980 15533 890305
Private 195850 000 2520 198370 000 000 1275640 1474010
Central 282920 000 000 282920 69800 000 000 352720
Sub-Total 980770 000 15312 996082 69800 359980 1291173 2717035
State 000 000 15996 15996 000 188150 15402 219548
Private 61500 17400 000 78900 000 000 20899 99799
Central 114322 35958 000 150280 36200 000 5000 191480
Sub-Total 175822 53358 15996 245176 36200 188150 41301 510827
State 432000 52408 000 484408 000 220320 12270 716998
Private 483767 50310 41170 575247 000 000 1130984 1706231
Central 448952 000 000 448952 144800 000 18190 611942
Sub-Total 1364719 102718 41170 1508607 144800 220320 1161444 3035171
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 000 000
Central 10000 000 000 10000 000 000 000 10000
Sub-Total 10000 000 000 10000 000 000 000 10000
State 000 3250 000 3250 000 000 000 3250
Private 000 000 000 000 000 000 171 171
Central 24840 000 000 24840 8600 000 000 33440
Sub-Total 24840 3250 000 28090 8600 000 171 36861
178400 000 000 178400 45000 000 000 223400
State 1943250 79198 28788 2051236 000 1183803 52102 3287141
Private 1212450 532210 47370 1792030 000 000 3495815 5287845
Central 1422502 35958 000 1458460 332000 000 49190 1839650
Grand Total 4578202 647366 76158 5301726 332000 1183803 3597107 10414636
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
SOUTHERN REGION
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
State Ownership Sector
Modewise breakup
Grand TotalThermal RES
(MNRE)Nuclear
Hydro
(Renewable)
Kerala
Tamil Nadu
NLC
Puducherry
Central - Unallocated
Total (Southern
Region)
Andhra Pradesh
Telangana
Karnataka
File NoCEA-CH-14-1142018-Coordination Division
(As on 31102018)
Coal Gas Diesel Total
State 71000 000 000 71000 000 000 7070 78070
Private 28100 000 000 28100 000 000 25545 53645
Central 291433 000 000 291433 000 11000 000 302432
Sub-Total 390533 000 000 390533 000 11000 32615 434147
State 42000 000 000 42000 000 13000 405 55405
Private 73000 000 000 73000 000 000 3207 76207
Central 39374 000 000 39374 000 6100 000 45474
Sub-Total 154374 000 000 154374 000 19100 3612 177086
State 540000 10000 000 550000 000 98600 9195 657795
Private 242500 000 000 242500 000 000 34452 276952
Central 76077 000 000 76077 000 41000 000 117077
Sub-Total 858577 10000 000 868577 000 139600 43647 1051824
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 000 000
Central 698504 000 000 698504 000 18620 000 717124
Sub-Total 698504 000 000 698504 000 18620 000 717124
State 42000 000 000 42000 000 206192 630 248822
Private 293900 000 000 293900 000 000 21648 315548
Central 163390 000 000 163390 000 8900 1000 173290
Sub-Total 499290 000 000 499290 000 215092 23278 737660
State 000 000 000 000 000 36000 5211 41211
Private 000 000 000 000 000 39900 001 39901
Central 8703 000 000 8703 000 6400 000 15103
Sub-Total 8703 000 000 8703 000 82300 5212 96215
110183 000 000 110183 000 8501 000 118684
State 695000 10000 000 705000 000 353792 22511 1081303
Private 637500 000 000 637500 000 39900 84853 762253
Central 1387664 000 000 1387664 000 100520 1000 1489184
Grand Total 2720164 10000 000 2730164 000 494212 108364 3332740
(As on 31102018)
Coal Gas Diesel Total
State 000 32821 000 32821 000 10000 3001 45822
Private 000 2450 000 2450 000 000 1680 4130
Central 27902 43556 000 71458 000 36851 000 108309
Sub-Total 27902 78827 000 106729 000 46851 4681 158261
State 000 000 000 000 000 000 10710 10710
Private 000 000 000 000 000 000 539 539
Central 2470 4682 000 7152 000 11800 000 18952
Sub-Total 2470 4682 000 7152 000 11800 11249 30201
State 000 000 000 000 000 32200 3103 35303
Private 000 000 000 000 000 000 006 006
Central 3040 10969 000 14009 000 7446 000 21455
Sub-Total 3040 10969 000 14009 000 39646 3109 56764
State 000 16950 000 16950 000 000 1601 18551
Private 000 000 000 000 000 000 009 009
Central 3740 43695 000 47435 000 7077 500 55012
Sub-Total 3740 60645 000 64385 000 7077 2110 73572
State 000 000 3600 3600 000 000 545 4145
Private 000 000 000 000 000 000 217 217
Central 3140 7157 000 10297 000 9677 000 19974
Sub-Total 3140 7157 3600 13897 000 9677 762 24336
State 000 000 000 000 000 000 3067 3067
Private 000 000 000 000 000 000 100 100
Central 2140 4893 000 7033 000 5860 000 12893
Sub-Total 2140 4893 000 7033 000 5860 3167 16060
State 000 000 000 000 000 000 3647 3647
Private 000 000 000 000 000 000 020 020
Central 2070 4046 000 6116 000 9913 000 16029
Sub-Total 2070 4046 000 6116 000 9913 3667 19696
7500 6362 000 13862 000 14376 000 28238
State 000 49771 3600 53371 000 42200 25674 121245
Private 000 2450 000 2450 000 000 2571 5021
Central 52002 125360 000 177362 000 103000 500 280862
Grand Total 52002 177581 3600 233183 000 145200 28745 407128
Central - Unallocated
Total (Eastern
Region)
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
NORTH-EASTERN REGION
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
State Ownership Sector
Modewise breakup
Grand TotalThermalNuclear
Bihar
Jharkhand
West Bengal
DVC
Odisha
Sikkim
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
EASTERN REGION
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
Ownership Sector
Modewise breakup
Grand TotalThermalNuclear
Hydro
(Renewable)
RES
(MNRE)
Manipur
Nagaland
State
Mizoram
Central - Unallocated
Total (North-
Eastern Region)
Hydro
(Renewable)
RES
(MNRE)
Assam
Arunachal Pradesh
Meghalaya
Tripura
File NoCEA-CH-14-1142018-Coordination Division
(As on 31102018)
Coal Gas Diesel Total
State 000 000 4005 4005 000 000 525 4530
Private 000 000 000 000 000 000 146 146
Central 000 000 000 000 000 000 510 510
Sub-Total 000 000 4005 4005 000 000 1181 5186
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 075 075
Central 000 000 000 000 000 000 000 000
Sub-Total 000 000 000 000 000 000 075 075
State 000 000 4005 4005 000 000 525 4530
Private 000 000 000 000 000 000 221 221
Central 000 000 000 000 000 000 510 510
Grand Total 000 000 4005 4005 000 000 1256 5261
19
Andaman amp
Nicobar
lakshadweep
Total (Islands)
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
State Ownership Sector
Modewise breakup
Grand TotalThermalNuclear
Hydro
(Renewable)
RES
(MNRE)
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
ISLANDS
File NoCEA-CH-14-1142018-Coordination Division
SrNo Contents Page
1 Executive summary of Target and Achievement of Transmission Lines during 2018-19
20(1)
2 List of Transmission Lines CommissionedReady for commissioning during Oct-2018 20(2)
Section C - Transmission Lines
File NoCEA-CH-14-1142018-Coordination Division
Executive summary of Target and Achievement of Transmission Lines during 2018-19 As on Oct-18
(All figures in circuit kms)
Centr
al S
ecto
r
Sta
te S
ecto
r
JV
Private
Secto
r
To
tal
Centr
al S
ecto
r
Sta
te S
ecto
r
JV
Private
Secto
r
To
tal
Centr
al S
ecto
r
Sta
te S
ecto
r
JV
Private
Secto
r
To
tal
Centr
al S
ecto
r
Sta
te S
ecto
r
JV
Private
Secto
r
To
tal
Centr
al S
ecto
r
Sta
te S
ecto
r
JV
Private
Secto
r
To
tal
Cen
tral S
ecto
r
Sta
te S
ecto
r
JV
Pri
vate
Secto
r
Gra
nd
To
tal
0 0 0 0 0 0 0 0 4692 766 827 6285 3045 5906 980 9931 553 5878 0 6431 8290 12550 1807 22647
Oct18 Programme 0 0 0 0 0 0 0 0 300 0 0 300 662 90 562 1314 0 723 0 723 962 813 562 2337
Achievement 0 0 0 0 0 0 0 0 729 0 0 729 471 266 0 737 0 401 0 401 1200 667 0 1867
Upto Oct-18 Programme 0 0 0 0 0 0 0 0 3004 416 0 3420 1350 3109 562 5021 481 4346 0 4827 4835 7871 562 13268
Achievement 0 0 0 0 0 0 0 0 2286 0 178 2464 1436 1783 1595 4814 60 4461 0 4521 3782 6244 1773 11799
20(1)
220 kV Grand Total 800 kV 500 kV
Programme 2018-19
Programme
Achievement
HVDC765 kV 400 kV
File NoCEA-CH-14-1142018-Coordination Division
SlNo Line
Length
(cKM)
1 2 3 4 5 6
1 765 Jharsuguda - Dharamjaygarh line DC PGCIL 296
2 765LILO of Kurnool - Thirvualam line at
CuddapahDC PGCIL 190
3 765 Salem PS - Madhugiri PS line SC PGCIL 243
4 400 Cuddapah - Hindupur line (Q) DC PGCIL 338
5 400LILO of Both Ckt of Bamnauli - Samaypur at
TughlakabadMC PGCIL 114
6 400LILO-Out of Cuddapah - Hindupur line (Q)
(Both Ckts) at NP Kunta ssDC PGCIL 19
1200
7 400LILO of Sterlite - Meramundali at Lapanga
4oo kV ssDC OPTCL 14
8 400 Sterlite - Lapanga line DC OPTCL 37
9 400 TMDC Podili - Sattapenalli line DC APTRANSCO 215
10 230Neyveli 230110 kV ss - Eachangadu
230kV FeederSC TANTRANSCO 1
11 230 NNTPS - Neyveli 230110kV ss DC TANTRANSCO 2
12 220 Ajmer (400 kV) - Bherunda (TK) DC RVPNL 100
13 220 Aligarh - Atrauli line DC UPPTCL 77
14 220 Khandwa - Chhanera line DC MPPTCL 78
15 220LILO of one Ckt of Hadala - Sartanpar line
at Wankaner on MC towersDC GETCO 6
16 220 LILO of one Ckt of Vita - Miraj at Alkud ss DC MSETCL 27
17 220 Mendhigiri - Alkud ss DC MSETCL 110
667
1867
20(2)
Grand Total
2Transmission Lines (220 kV and above) CommissionedReady for commissioning During Oct-2018
As on 31-10-18
Voltage
Level (kV)Name of Transmission Lines
Circuit
Type
Executing
Agency
CENTRAL SECTOR
Total of CENTRAL SECTOR
STATE SECTOR Sector
Total of STATE SECTOR
File NoCEA-CH-14-1142018-Coordination Division
SN Contents Page
1 Executive summary of Target and Achievement of Substations during 2018-19 21(1)
2Sub Stations (220 kV and above) commissionedready for commisssioning during Oct-
201821(2)
Section D - Sub Stations
File NoCEA-CH-14-1142018-Coordination Division
1 Executive summary of Target and Achievement of Substations during 2018-19 As on Oct-18
(All figures in circuit MVA)
Centr
al S
ecto
r
Sta
te S
ecto
r
JV
Private
Secto
r
To
tal
Centr
al S
ecto
r
Sta
te S
ecto
r
JV
Private
Secto
r
To
tal
Centr
al S
ecto
r
Sta
te S
ecto
r
JV
Private
Secto
r
To
tal
Centr
al S
ecto
r
Sta
te S
ecto
r
JV
Private
Secto
r
To
tal
Centr
al S
ecto
r
Sta
te S
ecto
r
JV
Private
Secto
r
To
tal
Cen
tral S
ecto
r
Sta
te S
ecto
r
JV
Pri
vate
Secto
r
Gra
nd
To
tal
3000 0 0 3000 0 0 0 0 22200 0 0 22200 8185 13085 630 21900 740 14760 0 15500 34125 27845 630 62600
Oct18 Programme 0 0 0 0 0 0 0 0 0 0 0 0 1000 1260 630 2890 0 1400 0 1400 1000 2660 630 4290
Achievement 0 0 0 0 0 0 0 0 3000 0 0 3000 1500 3120 0 4620 0 2220 0 2220 4500 5340 0 9840
Upto Oct-18 Programme 0 0 0 0 0 0 0 0 10000 0 0 10000 6130 7435 630 14195 0 9670 0 9670 16130 17105 630 33865
Achievement 0 0 0 0 0 0 0 0 14000 0 0 14000 9000 7550 630 17180 0 10610 0 10610 23000 18160 630 41790
21(1)
220 kV Grand Total 800 kV 500 kV
Programme 2018-19
Programme
Achievement
HVDC765 kV 400 kV
File NoCEA-CH-14-1142018-Coordination Division
As on 31-10-18
Sl Voltage Ratio Capacity
No (kVkV) (MWMVA)
1 2 3 4 5
1 Cuddapah Ss 765400 PGCIL 3000
2 Tughlakabad SS (GIS) 400220 PGCIL 1500
Total of CENTRAL SECTOR 4500
3 Panki Kanpur (Aug) TF-I 400200 UPPTCL 75
4 Hindupur ss (1st ICT) 400220 APTRANSCO 315
5 Thappagundu ss 400110 TANTRANSCO 600
6 Mendhasal (2nd power TF) 400220 OPTCL 20
7 Jodhpur ss (New) 400220 RVPNL 315
8 Shankarpally 400220 TSTRANSCO 500
9 Podili ss (1st ICT) 400220 APTRANSCO 315
10 Doni (Gadag)SS 400220 KPTCL 1000
11 Porur (Addl TF) 230110 TANTRANSCO 100
12 Anuppankulam (Addl TF) 230110 TANTRANSCO 60
13 Neyveli SS 230110 TANTRANSCO 480
14 Savarkundla (Aug) 22066 GETCO 60
15 Bhuna (Aug) 220132 HVPNL 100
16 Madanpur (Aug) 22066 HVPNL 100
17 Gurgaon Sec-52A (Aug) 22066 HVPNL 160
18 IA Hisar (Aug) 220132 HVPNL 50
19 Narwana (Aug) 220132 HVPNL 60
20 Therubali (3rd Auto TF) 220132 OPTCL 160
21 Halasar ss 220132 RVPNL 160
22 Bansi Siddaharthnagar (Aug) TF-I 220132 UPPTCL 60
23 Hata Kushinagar (New) TF-I 220132 UPPTCL 100
24 Gomti nagar Lucknow (Aug) TF-IV 22033 UPPTCL 60
25 Kanpur Road Lucknow (New) TF-III 22033 UPPTCL 60
26 Asoj (Aug) 22066 GETCO 150
27 Kangasiyali (Aug) 22066 GETCO 60
28 Karmsad (Aug) 22066 GETCO 160
29 Lalpar (Aug) 22066 GETCO 60
TOTAL STATE SECTOR 5340
GRAND TOTAL 9840
21(2)
PRIVATE SECTOR
CENTRAL SECTOR
STATE SECTOR
2Sub-Stations (220 kV and above) CommissionedReady for commissioning During Oct-2018
Name of Sub StationsExecuting
Agency
File NoCEA-CH-14-1142018-Coordination Division
SN Contents Page
1 Electricity Generation (MU) Targets and Achievements for 2018-19 22
Section E - Electricity Generation
File NoCEA-CH-14-1142018-Coordination Division
Programme Achievement Ach Programme Achievement Ach
Central Sector 35160700 3028100 3162321 10443 20144400 21150469 10499
State Sector 35132000 3010000 3017260 10024 19922100 19549030 9813
PvtIPP Sector 36999700 3240600 3375603 10417 21598300 20794155 9628
PvtUTL Sector 1857600 164500 180597 10979 1130900 1203107 10638
Total 109150000 9443200 9735781 10310 62795700 62696761 9984
Central Sector 5617600 420900 451004 10715 4193000 4045436 9648
State Sector 6110600 559500 708469 12663 4049400 4433000 10947
PvtIPP Sector 1141800 80500 90122 11195 976400 1021963 10467
PvtUTL Sector 130000 11300 12564 11119 76700 99943 13030
Total 13000000 1072200 1262159 11772 9295500 9600342 10328
Central Sector 3850000 353300 303310 8585 2068900 2203540 10651
Total 3850000 353300 303310 8585 2068900 2203540 10651
Bhutan Import 500000 63300 35395 5592 347000 416660 12007
Central Sector 44628300 3802300 3916635 10301 26406300 27399445 10376
State Sector 41242600 3569500 3725729 10438 23971500 23982030 10004
Pvt Sector 40129100 3496900 3658886 10463 23782300 23119168 9721
Total 126500000 10932000 11336645 10370 74507100 74917303 10055
Provisional based on actual-cum-Assesment
Figs in MU
Cummulative
Achievement
Cummulative
Achievement
Sep-18 Sep-17 Upto Sep-2018 Upto Sep-2017
1073794 748889 7332680 5660929
22
Renewable Energy Generation
Achievement
Oct-2018
1 Electricity Generation (MU) Targets and Achievememts for 2018-19
All India Energy Generation During April 2018- Oct 2018 (MU)
Target (2018-19)April 2018- Oct 2018
Sector
Hydro
Thermal
Nuclear
627957
92955
20689
745071
626968
96003
22035
749173
0
100000
200000
300000
400000
500000
600000
700000
800000
Thermal Hydro Nuclear Total
Programme
Achievement
File NoCEA-CH-14-1142018-Coordination Division
SN Contents Page
1 Energy Power Supply Position (Provisional) for Oct-2018 and during April 2018- Oct 2018 23
2 Peak Power Supply Position (Provisional) for Oct-2018 and during April 2018- Oct 2018 24
3 Energy Power Supply Position (Revised) for Sep-2018 and during April 2018- Sept 2018 25
4 Peak Power Supply Position (Revised) for Sep-2018 and during April 2018- Sept 2018 26
5 Notified Power cuts Restrictions on Industries during Oct-2018 27
6 Power Supply to Agricultural Sector during Oct-2018 28
Section F - Power supply position
File NoCEA-CH-14-1142018-Coordination Division
आकड़ मममलयन यननट नट Figures in MU net
ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied
कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )
चडीगढ़ Chandigarh 108 108 0 00 1055 1055 0 00
दिलली Delhi 2490 2489 1 00 22524 22510 14 01
हरियजणज Haryana 4554 4554 0 00 35205 35205 0 00
दहमजचल परिश Himachal Pradesh 788 787 2 02 5728 5560 168 29
रमम कशमीि Jammu amp Kashmir 1497 1219 278 186 10982 8865 2117 193
परजब Punjab 4418 4418 0 00 38832 38819 13 00
िजरसथजन Rajasthan 6748 6748 0 00 45341 45181 160 04
उतति परिश Uttar Pradesh 10136 9973 164 16 75485 74808 676 09
उततिजखड Uttarakhand 1083 1081 3 03 8395 8310 85 10
उततरी कषतर Northern Region 31822 31375 447 14 243547 240314 3233 13
छततीसगढ़ Chhattisgarh 2454 2453 1 00 16119 16091 28 02
गरिजत Gujarat 11636 11636 0 00 70782 70768 14 00
मधय परिश Madhya Pradesh 5860 5859 1 00 38412 38410 2 00
महजिजषटर Maharashtra 15223 15095 128 08 95489 95355 134 01
िमन औि दिउ Daman amp Diu 216 216 0 00 1523 1523 0 00
िजिि व नगि हवली Dadra amp Nagar Haveli 553 553 0 00 3757 3757 0 00
गोवज Goa 366 366 0 00 2497 2495 2 01
पशचिमी कषतर Western Region 36308 36178 130 04 228579 228398 180 01
आनधर परिश Andhra Pradesh 5860 5854 6 01 37377 37334 43 01
तलगजनज Telangana 6748 6742 6 01 38251 38205 46 01
कनजाटक Karnataka 5842 5835 7 01 39111 39059 52 01
किल Kerala 2116 2096 20 09 14256 14160 96 07
तममल नजड Tamil Nadu 8611 8601 10 01 65742 65666 76 01
पडचिी Puducherry 216 215 1 05 1654 1646 8 05
लकष-दवीप Lakshadweep 4 4 0 0 27 27 0 0
दकषकषणी कषतर Southern Region 29392 29342 50 02 196390 196069 321 02
बबहजि Bihar 2742 2738 4 01 19143 18951 192 10
िजमोिि घजटी ननगम DVC 1712 1698 13 08 13096 12828 268 20
झजिखणड Jharkhand 701 697 4 06 5022 4949 73 15
ओडडशज Odisha 3147 3134 13 04 20224 20192 32 02
पशशचम बगजल West Bengal 4204 4200 4 01 33008 32881 127 04
मसशककम Sikkim 40 40 0 00 279 279 0 01
अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 67 202 188 13 67
परवी कषतर Eastern Region 12547 12507 40 03 90772 90080 692 08
अरणजचल परिश Arunachal Pradesh 67 66 1 09 502 496 7 13
असम Assam 833 809 24 29 6153 5903 250 41
मणणपि Manipur 72 71 1 10 485 478 7 14
मघजलय Meghalaya 147 147 0 00 1043 1042 0 00
ममज़ोिम Mizoram 63 62 1 08 365 359 5 14
नजगजलड Nagaland 76 67 8 110 540 481 59 109
बिपिज Tripura 130 129 1 09 1025 1007 19 18
उततर-परवी कषतर North-Eastern Region 1387 1351 35 25 10113 9766 346 34
समपणण भारत All India 111455 110753 702 06 769399 764627 4773 06
23
ऊराण वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Energy Power Supply Position Report (Provisional)
राजयStateअकरबर2018 October2018 अपरल2018 -अकरबर2018 April2018 to October2018
ऊरजा पनत ा म कमी ऊरजा पनत ा म कमीEnergy not Supplied
Excludes energy exported to Bangladesh
Energy not Supplied
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
File NoCEA-CH-14-1142018-Coordination Division
अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met
कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )
चडीगढ़ Chandigarh 217 217 0 00 369 369 0 00
दिलली Delhi 4713 4713 0 00 7016 7016 0 00
हरियजणज Haryana 7948 7948 0 00 10270 10270 0 00
दहमजचल परिश Himachal Pradesh 1520 1520 0 00 1520 1520 0 00
रमम कशमीि Jammu amp Kashmir 2836 2269 567 200 2951 2361 590 200
परजब Punjab 7979 7979 0 00 12638 12638 0 00
िजरसथजन Rajasthan 11450 11450 0 00 11698 11698 0 00
उतति परिश Uttar Pradesh 17434 16745 688 39 20498 20062 436 21
उततिजखड Uttarakhand 1943 1943 0 00 2143 2143 0 00
उततरी कषतर Northern Region 50659 49635 1024 20 63166 61726 1440 23
छततीसगढ़ Chhattisgarh 4414 4268 146 33 4414 4268 146 33
गरिजत Gujarat 18148 18130 19 01 18148 18130 19 01
मधय परिश Madhya Pradesh 11356 11317 39 03 11356 11317 39 03
महजिजषटर Maharashtra 23864 23159 705 30 23864 23254 610 26
िमन औि दिउ Daman amp Diu 342 341 1 02 357 356 1 02
िजिि व नगि हवली Dadra amp Nagar Haveli 784 780 4 05 816 815 1 01
गोवज Goa 536 536 0 00 596 596 0 00
पशचिमी कषतर Western Region 56548 55695 853 15 56548 55695 853 15
आनधर परिश Andhra Pradesh 9435 9435 0 00 9435 9435 0 00
तलगजनज Telangana 10603 10603 0 00 10815 10815 0 00
कनजाटक Karnataka 10741 10741 0 00 10741 10741 0 00
किल Kerala 3727 3644 83 22 4050 3997 53 13
तममल नजड Tamil Nadu 14747 14333 414 28 15029 14981 47 03
पडचिी Puducherry 363 362 1 03 420 400 19 46
लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0
दकषकषणी कषतर Southern Region 45279 45226 53 01 45946 45684 262 06
बबहजि Bihar 4945 4945 0 00 5050 5045 5 01
िजमोिि घजटी ननगम DVC 2729 2729 0 00 2874 2874 0 00
झजिखणड Jharkhand 1260 1260 0 00 1339 1284 55 41
ओडडशज Odisha 5624 5224 400 71 5624 5357 268 48
पशशचम बगजल West Bengal 8775 8775 0 00 9130 9123 7 01
मसशककम Sikkim 86 86 0 00 90 90 0 00
अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7
परवी कषतर Eastern Region 22959 22567 392 17 22959 22567 392 17
अरणजचल परिश Arunachal Pradesh 138 125 13 94 138 133 5 37
असम Assam 1785 1704 81 45 1865 1809 56 30
मणणपि Manipur 187 185 2 11 193 186 7 36
मघजलय Meghalaya 336 336 0 00 371 368 2 07
ममज़ोिम Mizoram 99 97 2 20 103 98 4 41
नजगजलड Nagaland 134 131 3 22 156 138 18 117
बिपिज Tripura 269 269 0 00 298 293 5 17
उततर-परवी कषतर North-Eastern Region 2790 2700 90 32 2967 2850 117 39
समपणण भारत All India 172945 170604 2341 14 177022 175528 1494 08
24
अधिकतम वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Peak Power Supply Position Report (Provisional)
आकड़ मगज वजट नट Figures in MW netअपरल2018 -अकरबर2018 April2018 to October2018
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
मजग की पनता म कमी Demand not Met
Excludes the supply to Bangladesh
राजयStateअकरबर2018 October2018
मजग की पनता म कमी Demand not Met
File NoCEA-CH-14-1142018-Coordination Division
आकड़ मममलयन यननट नट Figures in MU net
ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied
कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )
चडीगढ़ Chandigarh 141 141 0 00 947 947 0 00
दिलली Delhi 2925 2924 1 00 20034 20021 13 01
हरियजणज Haryana 4794 4794 0 00 30651 30651 0 00
दहमजचल परिश Himachal Pradesh 876 853 24 27 4940 4773 167 34
रमम कशमीि Jammu amp Kashmir 1520 1246 274 180 9485 7646 1839 194
परजब Punjab 5575 5575 0 00 34414 34401 13 00
िजरसथजन Rajasthan 6202 6201 0 00 38594 38434 160 04
उतति परिश Uttar Pradesh 10211 10124 86 08 65349 64836 513 08
उततिजखड Uttarakhand 1162 1149 13 11 7311 7229 82 11
उततरी कषतर Northern Region 33405 33008 398 12 211725 208939 2786 13
छततीसगढ़ Chhattisgarh 2403 2388 15 06 13665 13638 27 02
गरिजत Gujarat 10122 10122 0 00 59146 59132 14 00
मधय परिश Madhya Pradesh 5492 5491 1 00 32552 32551 1 00
महजिजषटर Maharashtra 13615 13612 3 00 80266 80260 6 00
िमन औि दिउ Daman amp Diu 221 221 0 00 1306 1306 0 00
िजिि व नगि हवली Dadra amp Nagar Haveli 551 551 0 00 3204 3204 0 00
गोवज Goa 339 339 0 00 2131 2128 2 01
पशचिमी कषतर Western Region 32742 32723 19 01 192270 192220 50 00
आनधर परिश Andhra Pradesh 5294 5287 7 01 31518 31480 37 01
तलगजनज Telangana 6279 6272 8 01 31503 31463 40 01
कनजाटक Karnataka 5701 5693 8 01 33269 33225 45 01
किल Kerala 2050 2026 24 12 12140 12063 76 06
तममल नजड Tamil Nadu 8971 8959 12 01 57131 57065 66 01
पडचिी Puducherry 226 224 2 08 1438 1431 7 05
लकष-दवीप Lakshadweep 4 4 0 0 23 23 0 0
दकषकषणी कषतर Southern Region 28520 28460 60 02 166998 166727 271 02
बबहजि Bihar 2839 2793 46 16 16400 16213 188 11
िजमोिि घजटी ननगम DVC 1901 1750 151 79 11384 11130 254 22
झजिखणड Jharkhand 740 723 17 22 4321 4252 69 16
ओडडशज Odisha 2921 2918 3 01 17077 17058 19 01
पशशचम बगजल West Bengal 4902 4879 23 05 28804 28681 123 04
मसशककम Sikkim 39 39 0 01 239 239 0 01
अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 67 173 162 12 67
परवी कषतर Eastern Region 13341 13102 240 18 78225 77573 652 08
अरणजचल परिश Arunachal Pradesh 74 73 1 10 435 429 6 14
असम Assam 950 914 36 38 5320 5094 226 43
मणणपि Manipur 70 69 1 11 414 408 6 15
मघजलय Meghalaya 150 150 0 01 896 896 0 01
ममज़ोिम Mizoram 58 57 1 12 302 297 5 16
नजगजलड Nagaland 80 72 8 104 464 414 50 108
बिपिज Tripura 192 191 1 07 895 878 17 19
उततर-परवी कषतर North-Eastern Region 1575 1527 48 31 8726 8415 311 36
समपणण भारत All India 109584 108819 765 07 657944 653873 4071 06
Energy not Supplied Energy not Supplied
ससतबर2018 September2018 अपरल2018 -ससतबर2018 April2018 to September2018
ऊरजा पनत ा म कमी ऊरजा पनत ा म कमी
Excludes energy exported to Bangladesh
राजयState
ऊराण वरवदयत आपरतण शथिरत ररपोरण (सशोधित) Energy Power Supply Position Report (Revised)
25
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
File NoCEA-CH-14-1142018-Coordination Division
अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met
कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )
चडीगढ़ Chandigarh 293 293 0 00 369 369 0 00
दिलली Delhi 5358 5358 0 00 7016 7016 0 00
हरियजणज Haryana 9008 9008 0 00 10270 10270 0 00
दहमजचल परिश Himachal Pradesh 1466 1466 0 00 1479 1479 0 00
रमम कशमीि Jammu amp Kashmir 2951 2361 590 200 2951 2361 590 200
परजब Punjab 11405 11405 0 00 12638 12638 0 00
िजरसथजन Rajasthan 10612 10612 0 00 11698 11698 0 00
उतति परिश Uttar Pradesh 18346 18121 225 12 20498 20062 436 21
उततिजखड Uttarakhand 1996 1996 0 00 2143 2143 0 00
उततरी कषतर Northern Region 56407 55649 758 13 63166 61726 1440 23
छततीसगढ़ Chhattisgarh 4404 4075 328 75 4404 4136 268 61
गरिजत Gujarat 16963 16963 0 00 17053 16963 90 05
मधय परिश Madhya Pradesh 8811 8771 41 05 8811 8775 36 04
महजिजषटर Maharashtra 22455 22349 106 05 23395 23254 141 06
िमन औि दिउ Daman amp Diu 357 356 1 02 357 356 1 02
िजिि व नगि हवली Dadra amp Nagar Haveli 816 815 1 01 816 815 1 01
गोवज Goa 596 596 0 00 596 596 0 00
पशचिमी कषतर Western Region 52933 52895 38 01 53841 52895 945 18
आनधर परिश Andhra Pradesh 9435 9416 19 02 9435 9416 19 02
तलगजनज Telangana 10815 10815 0 00 10815 10815 0 00
कनजाटक Karnataka 10103 10090 13 01 10690 10688 2 00
किल Kerala 3888 3638 251 64 4050 3997 53 13
तममल नजड Tamil Nadu 14556 14553 3 00 15029 14981 47 03
पडचिी Puducherry 390 372 17 45 420 400 19 46
लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0
दकषकषणी कषतर Southern Region 45542 45428 114 02 45946 45684 262 06
बबहजि Bihar 5050 5045 5 01 5050 5045 5 01
िजमोिि घजटी ननगम DVC 2641 2641 0 00 2874 2874 0 00
झजिखणड Jharkhand 1233 1233 0 00 1339 1284 55 41
ओडडशज Odisha 4906 4906 0 00 5357 5357 0 00
पशशचम बगजल West Bengal 8644 8639 5 01 9130 9123 7 01
मसशककम Sikkim 78 78 0 00 90 90 0 00
अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7
परवी कषतर Eastern Region 22110 22100 10 00 22470 22290 180 08
अरणजचल परिश Arunachal Pradesh 132 130 2 15 138 133 5 37
असम Assam 1865 1809 56 30 1865 1809 56 30
मणणपि Manipur 184 182 2 13 193 186 7 36
मघजलय Meghalaya 317 317 0 00 371 368 2 07
ममज़ोिम Mizoram 95 93 2 23 103 98 4 41
नजगजलड Nagaland 142 138 5 32 156 138 18 117
बिपिज Tripura 296 293 3 10 298 293 5 17
उततर-परवी कषतर North-Eastern Region 2921 2850 71 24 2967 2850 117 39
समपणण भारत All India 177022 175528 1494 08 177022 175528 1494 08
26
मजग की पनता म कमी मजग की पनता म कमी Demand not MetDemand not Met
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
Excludes the supply to Bangladesh
अधिकतम वरवदयत आपरतण शथिरत ररपोरण (सशोधित) Peak Power Supply Position Report (Revised)
आकड़ मगज वजट नट Figures in MW net
राजयStateससतबर2018 September2018 अपरल2018 -ससतबर2018 April2018 to September2018
File NoCEA-CH-14-1142018-Coordination Division
अकरबर2018 October2018अपरल2018 -अकरबर2018 April2018 to October2018
उततरी कषतर Northern Region
चडीगढ़ Chandigarh Data not received Data not received
दिलली Delhi
हरियजणज Haryana
दहमजचल परिश Himachal Pradesh
रमम कशमीि Jammu amp Kashmir Data not received Data not received
परजब Punjab
िजरसथजन Rajasthanउतति परिश Uttar Pradesh
उततिजखड Uttarakhand
पशचिमी कषतर Western Region
छततीसगढ़ Chhattisgarh
गरिजत Gujarat
मधय परिश Madhya Pradesh
महजिजषटर Maharashtra
गोवज Goa
दकषकषणी कषतर Southern Region
आनधर परिश Andhra Pradesh
तलगजनज Telangana
कनजाटक Karnataka
किल Kerala
तममल नजड Tamil Nadu
पडचिी Puducherryपरवी कषतर Eastern Region
बबहजि Bihar
झजिखणड Jharkhand
ओडडशज Odisha
पशशचम बगजल West Bengal
N
o No
tified
Cuts
N
o No
tified
Cuts
27
अकरबर 2018 म इडथरीर पर वरवदयत करौती का वरवरवरण Notified Power CutsRestrictions on Industries during October2018
राजय कषतर State Regionऊराणमाग करौती EnergyDemand Cut
No Notified Cuts No Notified Cuts
File NoCEA-CH-14-1142018-Coordination Division
अकरबर2018 October2018अपरल2018 -अकरबर2018 April2018 to October2018
उततरी कषतर Northern Region
चडीगढ़ Chandigarh Data not received Data not received
दिलली Delhi Data not received Data not received
हरियजणज Haryana 940 hrsday 0709 - 0950 hrsday
दहमजचल परिश Himachal Pradesh No cut imposed on agriculture consumers and uninterrupted
power is being supplied to agriculture sector
HPSEBL has only 2 agriculture consumers and uninterrupted
power is being supplied to agriculture sector
रमम कशमीि Jammu amp Kashmir Data not received Data not received
परजब Punjab 0507 hrsday 0349 - 0844 hrsday
िजरसथजन Rajasthan 0630 hrsday 0630 hrsday
उतति परिश Uttar Pradesh 1825 hrsday 1814 - 1858 hrsday
उततिजखड Uttarakhand 2350 hrsday 2128 - 2357 hrsday
पशचिमी कषतर Western Region
छततीसगढ़ Chhattisgarh 18hoursday 18 hrsday
गरिजत Gujarat 805 hrsday 805 hrsday
मधय परिश Madhya Pradesh Three-Phase Supply(Irrigation)-947 hrs day
Three-Phase (Mixed) Supply - 2311 hrs day
Three-Phase Supply(Irrigation)- 0933 - 0947 hrs day Three-
Phase (Mixed) Supply - 2300 - 2320 hrs day
महजिजषटर Maharashtra Three-Phase Supply(Irrigation)- 9 hrs day
Three-Phase (Mixed) Supply - 24 hrs day
Three-Phase Supply(Irrigation)- 9 hrs day
Three-Phase (Mixed) Supply - 24 hrs day
गोवज Goa No restriction No restriction
दकषकषणी कषतर Southern Region
आनधर परिश Andhra Pradesh 07 hrsday 07 hrsday
तलगजनज Telangana 24 hoursday 24 hoursday
कनजाटक Karnataka 6 hrsday 6 hrsday
किल Kerala No Restrictions No Restrictions
तममल नजड Tamil Nadu 9 hrsday (6 hrs during day time and 3 hrs during night time) 9 hrsday (6 hrs during day time and 3 hrs during night time)
पडचिी Puducherry No Restrictions No Restrictions
परवी कषतर Eastern Region
बबहजि Bihar About 18 hrsday About 18 hrsday
झजिखणड Jharkhand About 20 hrsday About 20 hrsday
ओडडशज Odisha 24 hrsday 24 hrsday
पशशचम बगजल West Bengal About 23 hrsday About 23 hrsday
28
अकटबर 2018 कषि कषतर को षिदयत आपरति का षििरण Power Supply to Agricultural Sector during October2018
राजय कषतर State Regionऔसत वरवदयत आपरतण घनरो म Average Hours of Supply
On segregated feeders
File NoCEA-CH-14-1142018-Coordination Division
SNo Contents Page
1 Growth of Installed Capacity since 6th Plan 29
2 Progress of Transmission Sector since 6th Plan 30
3 All India Yearly Coal consumption for Power Generation (Utilities)
4 All India Annual Per Capita Consumption of Electricity since -2006
5 Average cost of power supply amp Average realisation (Paisakwh)
6 Growth of Rural Electrification amp Pump Sets Energisation
7 Status of Hydro Schemes Cleared by the CEA in Oct-2018
Section G - Growth of Power Sector
31
32
File NoCEA-CH-14-1142018-Coordination Division
(In MW)
Coal Gas Diesel Total
End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472
End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634
End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537
End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596
End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921
End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703
End of 12th Plan 19216288 2532938 83763 21832988 6780 4447842 50018 31960630
Up to Oct-2018 19599250 2493722 837629 22176734 6780 4548742 7201281 34604757
Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-17) = 51529 MW
Electricity Generation (MU) Targets and Achievements for 2016-17
Coal Gas Diesel Nuclear Hydro Res Total
1959925 2493722 837629 678000 454874 72012805 22925174
29
1 Growth of Installed Capacity Since 6th Plan
Plan YearThermal
Nuclear Hydro RES (MNRE) Total
Total Installed Capacity 34604757 MW
Coal Gas Diesel Nuclear Hydro Res
File NoCEA-CH-14-1142018-Coordination Division
Progress of Transmission Sector in the Country up to Oct 2018
1 TRANSMISSION LINES (All fig in CKM)
At the end of
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
6th plan 0 0 0 0 0 0 0 0 0 0 0 0 1831 4198 0 6029 1641 44364 0 46005 3472 48562 0 52034
7th plan 0 0 0 0 0 0 0 0 0 0 0 0 13068 6756 0 19824 4560 55071 0 59631 17628 61827 0 79455
8th plan 0 0 0 0 1634 0 0 1634 0 0 0 0 23001 13141 0 36142 6564 73036 0 79600 31199 86177 0 117376
9th plan 0 0 0 0 3234 1504 0 4738 751 409 0 1160 29345 20033 0 49378 8687 88306 0 96993 42017 110252 0 152269
10th plan 0 0 0 0 4368 1504 0 5872 1775 409 0 2184 48708 24730 0 73438 9444 105185 0 114629 64295 131828 0 196123
11th Plan 0 0 0 0 5948 1504 1980 9432 4839 411 0 5250 71023 30191 5605 106819 10140 125010 830 135980 91950 157116 8415 257481
12th Plan 6124 0 0 6124 5948 1504 1980 9432 25465 1177 4598 31240 92482 48240 17065 157787 11014 151276 978 163268 141033 202197 24621 367851
13th Plan (Up
to Mar2018)6124 0 0 6124 5948 1504 1980 9432 28666 1512 4881 35059 98247 54286 19067 171600 11258 156497 1000 168755 150243 213799 26928 390970
13th Plan (Up
to Sep-18)6124 0 0 6124 5948 1504 1980 9432 30952 1512 5059 37523 99683 56069 20662 176414 11318 160958 1000 173276 154025 220043 28701 402769
27150
75050
47900
118050
90650
30
IR addition in 12th Plan (up to
March 2017)
Total IR (up to Oct-18)
IR at the end of 11th Plan
IR at the end of 12th Plan
Envisaged IR Capacity at the end
of 13th Plan
Grand Total
Note - The figure upto the end of 10th plan in for stringing progress including the lines not commissioned Now only commissioned lines are reckoned Accordingly the figure for 10th plan (end) may read as 187555 after adjusting with (-) 10852 Ckm
Inter-regional Power Transfer Capacity
plusmn 800 kV HVDC plusmn 500 kV HVDC 765 kV 400 kV 220 kV
File NoCEA-CH-14-1142018-Coordination Division
2004-05 27800
2005-06 28100
2006-07 30200
2007-08 33000
2008-09 35500
2009-10 36700
2010-11 38700
2011-12 41756
2012-13 45460
2013-14 48940
2014-15 53040
2015-16 54590
2016-17 57430
2017-18 60800
Year
2005-06
2006-07
2007-08
2008-09
2009-10
2010-11
2011-12
2012-13
2013-14
2014-15
2015-16
2016-17
2017-18
2004-05 254 209 7568
2005-06 260 221 7636
2006-07 276 227 7423
2007-08 293 239 7727
2008-09 340 263 8713
2009-10 355 268 8870
2010-11 398 303 11975
2011-12 455 330 13514
2012-13 501 376 14867
2013-14 518 175
2014-15 520
6719
7171
3 All India yearly Coal Consumption for Power Generation (Utilities)
YEARCoal Consumption
Million Tonnes
4 All India Annual per Capita consumption of Electricity Since 2006
Per Capita Consumption ( kWh)
6314
(GrossGen+ Net Import) Mid-year population
5 Average cost of power supply amp average realization ( paiseKWH )
Yearcost of supply
(paiseunit)
Realization(paiseunit)
Including AgricultureOnly
Agriculture
1149
7335
7786
91441
8188
88363
957
1010
1075
1122
File NoCEA-CH-14-1142018-Coordination Division
Source- PFC Reports on the performance of State Power Utilities 31
File NoCEA-CH-14-1142018-Coordination Division
Sl
NoExecuting Agency
Installed
Capacity (MW)Cost (Rs crore)
Date of
Clearance
32
No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification
since 2004-05
65291374575 296361511th Plan
Cumu upto End of 11th Plan
596556 21212860
557439Cummulative up to end of 12th Plan
46708
18423975
499150
2003-042004-05
5743
9769
Cumu upto End of 10th Plan
010407 to 310308
010410 to 310311557976840909
010411 to 310312
412667
86293726
3207
482864
12632
1576036
4451722594
15455554
2314176
397343611750
2093311060316074
65109527813884
6 Growth Of Rural Electrification amp Pumpsets Energisation
Plan Year
9th Plan2002-03
134092626
4111
Pump Sets Energised Villages Electricfied (Nos)
2001-02
284064367244
1218
27801997-981998-991999-002000-01
297594
010408 to 310309010409 to 310310
10th Plan
2005-062006-07
322968331020
Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as
Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received
from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made
available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified
villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is
independent of the earlier published reports
No Hydro Electric Project has been issued concurrenceAppraisal letter by CEA during October 2018
7 Status of Hydro Schemes Cleared by the CEA in Oct-2018
Name of Scheme
File NoCEA-CH-14-1142018-Coordination Division
SN Contents Page
1 Rate of sale of power for the year 2016-17 33-41
RATE OF SALE OF POWER FOR THE YEAR 2016-17
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) NORTHERN REGION
CENTRAL SECTOR
BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 18000 66900 19800
CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 54000 222400 21600
CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 30000 144400 19600
CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 23100 91700 42600
PARBATI - III HPS NHPC LTD HYDRO-HYDRO 52000 68200 54800
DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 28000 95600 30000
CHUTAK NHPC LTD HYDRO-HYDRO 4400 22000 79800
DULHASTI HPS NHPC LTD HYDRO-HYDRO 39000 228000 56400
SALAL HPS NHPC LTD HYDRO-HYDRO 69000 342300 11000
TANAKPUR HPS NHPC LTD HYDRO-HYDRO 9420 43000 29600
URI HPS -I NHPC LTD HYDRO-HYDRO 48000 280300 16000
URI HPS - II NHPC LTD HYDRO-HYDRO 24000 147300 48600
NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 4500 24600 88200
SEWA - II NHPC LTD HYDRO-HYDRO 12000 47100 43400
ANTA CCPP NTPC LTD THERMAL-GASN 41930 67539 32400
AURAIYA CCPP NTPC LTD THERMAL-GASN 66336 53501 39100
BADARPUR TPS NTPC LTD THERMAL-COAL 70500 159153 44800
DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 84000 296170 42300
DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 98000 526686 46300
DADRI CCPP NTPC LTD THERMAL-GASHSD 82978 227469 33000
FARIDABAD CCPP NTPC LTD THERMAL-GASN 43159 115577 30800
RIHAND STPS I NTPC LTD THERMAL-COAL 100000 596766 24500
RIHAND STPS II NTPC LTD THERMAL-COAL 100000 737069 24600
RIHAND STPS III NTPC LTD THERMAL-COAL 100000 706546 30600
SINGRAULI STPS NTPC LTD THERMAL-COAL 200000 1394068 20400
TANDA TPS NTPC LTD THERMAL-COAL 44000 295438 40800
UNCHAHAR TPS I NTPC LTD THERMAL-COAL 42000 256454 39800
UNCHAHAR TPS II NTPC LTD THERMAL-COAL 42000 273577 38900
UNCHAHAR TPS III NTPC LTD THERMAL-COAL 21000 142780 43000
KOLDAM NTPC LTD HYDRO-HYDRO 80000 363260 43600
NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 303575 25841
RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 108000 668677 35374
NJHPS SJVNL HYDRO-HYDRO 150000 699496 23820
RAMPUR HPS SJVNL HYDRO-HYDRO 41202 195982 32260
TEHRI HPP THDC HYDRO-HYDRO 100000 272543 51800
KOTESHWAR HEP THDC HYDRO-HYDRO 40000 106244 53400
IGSTPS JHAJJAR ARAVALI P CPL THERMAL-COAL 150000 510429 49490
NEYVELI BARSINGSAR NEYVELI LIG CORP LTD THERMAL-LIG 25000 127520 38040
STATE SECTOR
PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 21000 14222 48200
PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 21000 19205 48400
PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 25000 102257 42600
PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 25000 62107 41800
DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 60000 312213 41000
RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 120000 35767442200
WYC HYDEL STATION HPGCL HYDRO-HYDRO 6240 20365 24900
GIRI POWER HOUSE HPSEB HYDRO-HYDRO 6000 13958 7600
ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 1695 5467 11900
BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 12000 18528 6700
GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 2250 7462 22500
BASSI POWER HOUSE HPSEB HYDRO-HYDRO 6600 29649 7500
BINWA POWER HOUSE HPSEB HYDRO-HYDRO 600 2749 19300
ANNEXURE-I
RATE OF SALE OF POWER FOR THE YEAR 2016-2017
Page 33
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) GAJ POWER HOUSE HPSEB HYDRO-HYDRO 1050 2914 26700
BANER POWER HOUSE HPSEB HYDRO-HYDRO 1200 2864 16200
HOLI POWER HOUSE HPSEB HYDRO-HYDRO 300 616 22500
THIROT POWER HOUSE HPSEB HYDRO-HYDRO 450 1126 22500
KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 1200 3064 22500
LARJI POWER HOUSE HPSEB HYDRO-HYDRO 12600 53677 23700
NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 250 750 31000
CHABA POWER HOUSE HPSEB HYDRO-HYDRO 175 465 23300
RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 150 101 13400
SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 200 000 22500
KILLAR HPSEB HYDRO-HYDRO 030 050 22500
BHABA AUGUMENP H HPSEB HYDRO-HYDRO 450 1276 22500
BS CHAMBA HPSEB HYDRO-HYDRO 045 099 19500
GUMMA HPSEB HYDRO-HYDRO 300 423 22500
GAS TURBINE POWER STATION IPGCL THERMAL-GAS 27000 67233 39300
PPS-I PPCL THERMAL-GAS 33000 175905 38300
PPS-III PPCL THERMAL-GAS 137120 196879 36100
LOWER JHELUM JampKPDD HYDRO-HYDRO 10500 60214 5100
UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 2260 10514 6300
UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 10500 44202 8500
GANDHARBAL JampKPDD HYDRO-HYDRO 1500 8925 4700
KARNAH MPH JampKPDD HYDRO-HYDRO 200 1122 31000
CHENANI I JampKPDD HYDRO-HYDRO 2330 10892 6600
CHENANI II JampKPDD HYDRO-HYDRO 200 1188 9300
CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 750 3634 14200
IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 375 2108 18500
IGO MERCHELLONG JampKPDD HYDRO-HYDRO 300 1572 29700
PAHALGAM MHP JampKPDD HYDRO-HYDRO 450 1713 32900
MARPACHOO JampKPDD HYDRO-HYDRO 075 375 29800
HAFTAL JampKPDD HYDRO-HYDRO 100 483 28700
SANJAK JampKPDD HYDRO-HYDRO 126 441 36000
SEWA-III JampKPDD HYDRO-HYDRO 900 3273 20200
BHADERWAH JampKPDD HYDRO-HYDRO 150 935 8900
BAZGO JampKPDD HYDRO-HYDRO 030 108 33300
SUMOOR JampKPDD HYDRO-HYDRO 010 045 35400
HUNDER JampKPDD HYDRO-HYDRO 040 176 26200
STAKNA JampKPDD HYDRO-HYDRO 400 1933 4100
KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 124000 662879 31360
SURATGARH TPS RRVUNL THERMAL-COAL 150000 402328 41730
CHHABRA TPS 1amp 2 RRVUNL THERMAL-COAL 50000 305946 36700
CHHABRA TPS 3 RRVUNL THERMAL-COAL 25000 151536 36700
CHHABRA TPS 4 RRVUNL THERMAL-COAL 25000 155896 36700
RAMGARH GT POWER PROJECT RRVUNL THERMAL-COAL 22050 43177 41800
RAMGARH GAS T P PROJECT 3 RRVUNL THERMAL-GAS 5000 93615 41800
DHOLPUR C C POWER PROJECT RRVUNL THERMAL-R-LNG 33000 9486 46110
MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 14000 20855 34192
MINI MICRO HYDEL (MMH) P S RRVUNL HYDRO-HYDRO 2385 851 37800
KALISINDH TPP 1 RRVUNL THERMAL-COAL 60000 341543 45000
KALISINDH TPP 2 RRVUNL THERMAL-COAL 60000 211588 45000
KHARA HEP UPJVNL HYDRO-HYDRO 7200 26654 7200
MATATILLA HEP UPJVNL HYDRO-HYDRO 3060 12219 6500
OBRA HEP UPJVNL HYDRO-HYDRO 9900 21517 6300
RIHAND UPJVNL HYDRO-HYDRO 30000 57369 5500
ANPARA A TPS UPRVUNL THERMAL-COAL 63000 317536 27000
ANPARA B TPS UPRVUNL THERMAL-COAL 100000 705605 22700
ANPARA D UPRVUNL THERMAL-COAL 100000 300158 39800
HARDUAGANJ TPS UPRVUNL THERMAL-COAL 16500 45817 49200
HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 50000 304389 46600
OBRA A TPS UPRVUNL THERMAL-COAL 28800 13158 34000
OBRA B TPS UPRVUNL THERMAL-COAL 100000 328124 21900
Page 34
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) PANKI TPS UPRVUNL THERMAL-COAL 21000 66488 50300
PARICHHA TPS UPRVUNL THERMAL-COAL 22000 38762 49400
PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 42000 231931 45600
PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 50000 276722 50400
CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 24000 70845 8290
CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 14400 75366 8390
DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 3375 9595 12080
DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 5100 18701 10520
KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4140 17359 12330
KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 12000 33001 9420
KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 3000 11953 8320
TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 9000 33983 12460
MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 30400 124510 16110
RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 19800 17897 10550
MPUR UTTARAKHAND JVNL HYDRO-HYDRO 930 5121 19200
PATHRI UTTARAKHAND JVNL HYDRO-HYDRO 2040 11636 14200
GALOGI UTTARAKHAND JVNL HYDRO-HYDRO 300 648 12500
PRIVATE SECTOR
MGTPP CLP INDIA PVT LTD THERMAL-COAL 132000 268902 41940
SHRINAGAR HEP ALAKNANDA HPCL HYDRO-HYDRO 33000 127414 48800
GAMA INFRAPROP CCPP GAMA INFRAPROP PVT THERMAL-GAS 22500 52686 47000
PPGCL (BARA) JP POWER VENTURES LTD THERMAL-COAL 198000 448200 38500
MALANA HEP MALANA PCL HYDRO-HYDRO 8600 26354 29792
MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 10000 30369 32580
ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 19200 56347 36079
KASHANG HEP H P PCL HYDRO-HYDRO 19500 5034 29200
BASPA-II HEP HBPCL HYDRO-HYDRO 30000 132769 13600
KARCHAM WANGTOO HEP HBPCL HYDRO-HYDRO 100000 434386 36600
RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 108000 582600 43700
RITHALA COMBI CY POWER PLANT TATA POWER DDL THERMAL-GAS 9480 000 11900
RAJPURA TPS NABHA POWER LTD THERMAL-GAS 140000 901484 39000
TALWANDI SABO POWER LTD TALWANDI SABO POWER LTD THERMAL-COAL 198000 636040 49548
ROJA THERMAL POWER STATION ROJA POWER SCL THERMAL-COAL 120000 727200 43400
KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 34400 63400
BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 36000 62600
MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 38200 60800
UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 37900 61500
KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 42300 58800
LALITPUR PGCL BAJAJ ENERGY PVT LTD THERMAL-COAL 198000 359400 47300
PRAYAGRAJ PGCL PRAYAGRAJ PGCL THERMAL-COAL 132000 448200 38595
KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 132000 783182 33438
WESTERN REGION
CENTRAL SECTOR
INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 100000 325333 23892
OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 52000 141663 34001
GANDHAR CCPP NTPC LTD THERMAL-GAS 65739 221924 28700
KAWAS CCPP NTPC LTD THERMAL-GASN 65620 167929 27000
KORBA I amp II NTPC LTD THERMAL-COAL 210000 1499171 20500
KORBA III NTPC LTD THERMAL-COAL 50000 358746 26600
SIPAT STPS I NTPC LTD THERMAL-COAL 198000 1479902 26800
SIPAT STPS II NTPC LTD THERMAL-COAL 100000 766549 26500
VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 126000 693142 25800
VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 100000 608781 23800
VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 100000 673475 27600
VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 100000 655924 32900
VINDHYACHAL STPS V NTPC LTD THERMAL-COAL 50000 328265 31700
MOUDA I NTPC LTD THERMAL-COAL 100000 343130 44500
MOUDA Ii NTPC LTD THERMAL-COAL 66000 40637 39900
RATNAGIRI GAS amp POWER PVT LTD RGPPL THERMAL-GAS 196708 442485 47000
KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 000 24729
TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 32000 201227 10740
Page 35
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 365122 19069
TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 787444 29324
STATE SECTOR
GSEG-HAZIRA15610 MW GUJARAT S ENEGEN LTD THERMAL-GAS 15610 1805 28200
GSEG-HAZIRA35143 MW GUJARAT S ENEGEN LTD THERMAL-GAS 35130 22276 51300
GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 21978 51800
AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 13929 26100
KORBA TPS EAST CSPGCL THERMAL-COAL 44000 198673 33880
DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 365808 27570
KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 316500 30420
HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 532878 19410
CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 515 58300
MTTPS CHAMPA U-I CSPGCL THERMAL-COAL 50000 220376 39000
MTTPS CHAMPA U-II CSPGCL THERMAL-COAL 50000 23709 10000
SHP GANGREL CSPGCL HYDRO-HYDRO 1000 2350 36790
BANGO HEP CSPGCL HYDRO-HYDRO 12000 14662 8900
MHP KORBA WEST CSPGCL HYDRO-HYDRO 170 859 38190
SIKASAR HEP CSPGCL HYDRO-HYDRO 700 418 26870
DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8843 74500
DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 19446 51500
GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 66388 71600
GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127488 41300
KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 96072 43900
KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 29841 56400
SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 184966 58800
UKAI 1-5 GSECL THERMAL-COAL 85000 204891 46900
UKAI TPS 6 GSECL THERMAL-COAL 50000 284448 48200
WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 271999 58300
WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 82808 44100
KADANA HPS GSECL HYDRO-HYDRO 24200 34433 16800
UKAI HPS GSECL HYDRO-HYDRO 30500 40585 6100
TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 123000 11500
BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 8900 10900
BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 7200 27500
JHINNA HPS MPPGCL HYDRO-HYDRO 2000 9700 18500
RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 44300 3400
GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 17300 4600
SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 4100 16900
MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 14600 27000
PENCH HPS MPPGCL HYDRO-HYDRO 16000 23700 8100
RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 3000 16900
AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 134400 35100
SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 283800 38700
SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 344600 34300
SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 111600 61600
SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 211800 58000
SSTPS PH-I MPPGCL THERMAL-COAL 120000 233100 84300
BHUSAWAL TPS MSPGCL THERMAL-COAL 142000 566258 51100
CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1365682 33700
KHAPERKHEDA MSPGCL THERMAL-COAL 134000 706207 39100
KORADI TPS MSPGCL THERMAL-COAL 62000 443206 42000
NASIK TPS MSPGCL THERMAL-COAL 63000 297275 47000
PARLI TPS MSPGCL THERMAL-COAL 113000 175934 71600
PARAS MSPGCL THERMAL-COAL 50000 267931 38700
URAN CCPP MSPGCL THERMAL-GAS 67200 320330 30600
KOYANA MSPGCL HYDRO-HYDRO 195600 328155 13100
SMALL HYDRO POWER PLANTS MSPGCL HYDRO-HYDRO 45400 93062 30500
BHIRA MSPGCL HYDRO-HYDRO 8000 10046 8400
TILLARI MSPGCL HYDRO-HYDRO 8900 10584 3100
SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 233298 20500
SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 87633 20500
PRIVATE SECTOR
Page 36
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 81282 46750
JNSTPP(JAYPEE NIGRIE) JP POWER VENTURES LTD THERMAL-COAL 132000 726695 29310
MB POWER MB POWER THERMAL-COAL 120000 345632 38310
ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 754922 28671
ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 780761 23495
ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 198000 1263784 32090
ADANI POWER MAHARA ADANI POWER LTD THERMAL-COAL 330000 1666191 34124
AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 170065 36827
SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 252035 45129
ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 458551 36000
ESSAR POWER MP LTD ESSAR POWER MP LTD THERMAL-COAL 60000 243040 28600
VEDANTA LTD (P P -I) VEDANTA LTD THERMAL-GAS 3000 15044 24000
VEDANTA LTD (P P -II) VEDANTA LTD THERMAL-GAS 3000 21293 24000
PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 8234600 24000
165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 5850 64390
145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 68717 40349
SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 132655 28776
SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 144686 38567
MUNDRA UMPPCOASTAL GUJARAT POWER
LTD THERMAL-IMP COAL 400000 2530300
23900
LANCO AMARKANTAK TPP PATHADIH
U-ILANCO AMARKAN POWER LTD THERMAL-COAL 30000 195500
29200
LANCO AMARKANTAK TPP PATHADIH
U-IILANCO AMARKAN POWER LTD THERMAL-COAL 30000 206900
27600
BARADARHA TPS D B POWER LTD THERMAL-COAL 120000 677373 29200
JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 405000 28900
JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 453000 40500
DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 339437 40700
TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 293400 44000
TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 137200 37000
TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 174900 44000
BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 92900 14100
BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23700 34300
KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 27600 48300
CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2530300 23900
BHANDARDRA HEP -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 2475 54900
SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 161400 26500
SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 445000 39000
SOTHERN REGION
CENTRAL SECTOR
NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 325699 54820
NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 305532 39880
NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 998805 38510
NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 113016 54070
NEYVELI TAMILNADU POWER LTD JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 625274 42200
VALLUR TPS NTPC TECL THERMAL-COAL 150000 856438 42350
R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 1493 84300
RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1502919 29400
RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 341291 31800
SIMHADRI I NTPC LTD THERMAL-COAL 100000 688382 36800
SIMHADRI II NTPC LTD THERMAL-COAL 100000 663657 43400
KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 593110 31324
MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 291625 21764
KKNPP-1 amp 2 NPCIL NUCLEAR-NUCLEAR 200000 572609 40948
MINICOY LAKSHADEEP THERMAL-DIESEL 340 770 29600
KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1097 29600
AMINI LAKSHADEEP THERMAL-DIESEL 265 509 29600
ANDROTT LAKSHADEEP THERMAL-DIESEL 219 524 29600
KALPENI LAKSHADEEP THERMAL-DIESEL 175 356 29600
AGATTI LAKSHADEEP THERMAL-DIESEL 195 658 29600
KADMAT LAKSHADEEP THERMAL-DIESEL 190 414 29600
KILTAN LAKSHADEEP THERMAL-DIESEL 150 269 29600
CHETLET LAKSHADEEP THERMAL-DIESEL 100 139 29600
BITRA LAKSHADEEP THERMAL-DIESEL 043 024 29600
BANGARAM LAKSHADEEP THERMAL-DIESEL 018 009 29600
Page 37
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) STATE SECTOR
Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 721811 46500
Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 50000 336142 46500
RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 237358 46500
RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 239926 46500
RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 124500 46500
SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 62109 46500
UPPER SILERU APGENCO HYDRO-HYDRO 24000 33000 46500
LOWER SILERU APGENCO HYDRO-HYDRO 46000 81066 46500
DONKARAI APGENCO HYDRO-HYDRO 2500 6007 46500
PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 1262 46500
CHETTIPETA APGENCO HYDRO-HYDRO 100 214 46500
MUCHKUND APGENCO HYDRO-HYDRO 12000 37571 46500
NAGARJUNASAGAR RCPH APGENCO HYDRO-HYDRO 9000 606 46500
TUNGABHADRA HES amp HAMPI(AP
Share)
APGENCO HYDRO-HYDRO 7200 6100 46500
KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 352232 42600
KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 288131 32500
KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 319272 46500
RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 40073 44300
KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 308317 46000
KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 308963 51300
SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 61004 76600
NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 17960 75300
PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 20873 58300
POCHAMPAD-I TSPGENCO HYDRO-HYDRO 2700 5455 29800
POCHAMPAD-II TSPGENCO HYDRO-HYDRO 900 1932 40700
NIZAMSAGAR TSPGENCO HYDRO-HYDRO 1000 1126 53400
RAICHUR TPS 1 to 7 KPCL THERMAL-COAL 147000 890866 43800
RAICHUR TPS 8 KPCL THERMAL-COAL 25000 159523 48200
BELLARI TPS 1 KPCL THERMAL-COAL 50000 318679 51100
BELLARI TPS 2 KPCL THERMAL-COAL 50000 232347 55600
BELLARI TPS 3 KPCL THERMAL-COAL 70000 47565 34400
BHADRA PH KPCL HYDRO-HYDRO 3920 2369 45900
GERUSUPPA PH KPCL HYDRO-HYDRO 24000 26990 22000
GHAT PRABHA HEP KPCL HYDRO-HYDRO 3200 4777 25300
KADRA HPS KPCL HYDRO-HYDRO 15000 16889 26800
NAGJHARI KPCL HYDRO-HYDRO 90000 155159 9800
KODASALLI DPH KPCL HYDRO-HYDRO 12000 14854 19200
MUNIRA+MGH+SPH+SPH KPCL HYDRO-HYDRO 22640 48211 7900
SHARAVATHY HPS KPCL HYDRO-HYDRO 108550 276215 5400
ALMATTI DPH KPCL HYDRO-HYDRO 29000 39611 24600
VARAHI UGPH KPCL HYDRO-HYDRO 46000 71368 15600
IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 17196 15300
IDUKKI HPS KSEB HYDRO-HYDRO 78000 137905 15300
KAKKAD HPS KSEB HYDRO-HYDRO 5000 13063 15300
KALLADA HPS KSEB HYDRO-HYDRO 1500 4436 15300
KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 46544 15300
KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 635 15300
LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 30822 15300
MALANKARA HPS KSEB HYDRO-HYDRO 1050 2474 15300
MATTUPETTY KSEB HYDRO-HYDRO 200 230 15300
MALAMPUZHA KSEB HYDRO-HYDRO 250 063 15300
CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 864 15300
URUMI ST I amp II KSEB HYDRO-HYDRO 615 903 15300
LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 248 15300
NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7765 19625 15300
PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 16601 15300
PANNIAR HPS KSEB HYDRO-HYDRO 3240 6217 15300
PORINGALKUTHU KSEB HYDRO-HYDRO 3600 10052 15300
PORINGALKUTHU LBE KSEB HYDRO-HYDRO 1600 9438 15300
PEPPARA KSEB HYDRO-HYDRO 300 395 15300
POOZHITHODE KSEB HYDRO-HYDRO 480 1045 15300
Page 38
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) PEECHI KSEB HYDRO-HYDRO 125 040 15300
RANI-PERUNADU KSEB HYDRO-HYDRO 400 585 15300
SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 79783 15300
SENGULAM HPS KSEB HYDRO-HYDRO 5120 11558 15300
SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 16711 15300
VILANGAD KSEB HYDRO-HYDRO 750 1578 15300
BARAPOLE KSEB HYDRO-HYDRO 1500 1932 15300
VELLATHOOVAL KSEB HYDRO-HYDRO 360 305 15300
CHIM0NY KSEB HYDRO-HYDRO 250 156 15300
ADYANPARA KSEB HYDRO-HYDRO 350 501 15300
BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 554 15300
KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 3801 15300
KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 23132 32800
ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 14416 62280
METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 523970 62280
METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 321270 62280
NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 336575 62280
NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 591240 62280
TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 508966 62280
KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 30897 62280
VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 18720 90699 62280
KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 33593 62280
BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 1047 62280
PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 1250 62280
PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 330 62280
MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 4897 62280
MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 032 62280
KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15681 62280
KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 40608 62280
KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 21342 62280
KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 4717 62280
KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4322 62280
KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2399 62280
METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 4416 62280
METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 8035 62280
BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2187 62280
BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2359 62280
BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2511 62280
BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 1949 62280
BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 1819 62280
POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 172 62280
SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 241 62280
MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 026 62280
THIRUMOORTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 136 62280
PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 9309 62280
VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 353 62280
SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 4192 62280
PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 6571 62280
SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 1186 62280
SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6319 62280
ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 6122 62280
KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 28674 62280
SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 18381 62280
SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 4258 62280
KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 12680 62280
KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4201 62280
ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 000 62280
PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 19175 62280
AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 078 62280
BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 504 62280
BHAVANI KATTALAI (BKB)(IIIampIII BB I amp II)TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 5847 62280
PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 000 62280
Page 39
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) SRI DAMODARAM STPS APPDCL THERMAL-COAL 160000 808108 36300
PRIVATE SECTOR
KARUPPUR TANJORE LANCO TANJORE PCL THERMAL-GAS 12000 48096 28770
SIMHAPURI ENERGY LTD SIMHAPURI ENERGY LTD THERMAL-COAL 60000 143900 39100
JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 7111 45500
SBU 1 JSW ENERGY LTD
VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 26000 159100
43300
SBU 2 JSW ENERGY LTD
VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 60000 247900
42800
LANCO KPLLANCO KONDAPALLI POWER
LTDTHERMAL-GAS 36814 85060
25776
LANCO KPL STG -IILANCO KONDAPALLI POWER
LTDTHERMAL-GAS 36600 12979
46330
LANCO KPL STG -IIIALANCO KONDAPALLI POWER
LTDTHERMAL-GAS 37100 85710
46330
LANCO KPL STG -III BLANCO KONDAPALLI POWER
LTDTHERMAL-GAS 37100 43639
46330
HINDUJA NATIONAL PCL HINDUJA NATIONAL PCL THERMAL-COAL 104000 303000 38200
MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 121164 49940
UDUPI POWER COR LTD ADANI POWER LTD THERMAL-COAL 120000 754613 42500
SPECTRUM POWER GENERATION
LTD SPECTRUM PG LTD THERMAL-GASN 20525 9256812
34952
TAQA NEYVELI POWER COM PVT
LTD TAQA NEYVELI THERMAL-LIG 25000 5840
34500
ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 251000 51000
ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 207860 36800
GMR VEMAGIRI POWER GENERATION
LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 30117
46450
EASTERN REGION
CENTRAL SECTOR
MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 64675 53113
MTPS STAGE - II KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 39000 1432 69138
BOKARO `B` TPS DVC THERMAL-COAL 63000 145670 31539
MEJIA TPS U 1-3 DVC THERMAL-COAL 63000 348298 31552
MEJIA TPS U 4 DVC THERMAL-COAL 21000 116099 34997
MEJIA TPS U 5-6 DVC THERMAL-COAL 50000 276427 35976
MEJIA TPS U 7-8 DVC THERMAL-COAL 100000 552854 36991
DURGAPUR STEEL TPS DVC THERMAL-COAL 100000 665550 39323
DURGAPUR TPS DVC THERMAL-COAL 21000 59270 35416
RAGHUNATHPUR TPS DVC THERMAL-COAL 120000 201650 35326
MAITHON HYDEL STA DVC HYDRO-HYDRO 6320 12200 17984
CHANDRAPURA TPSU1-3 DVC THERMAL-COAL 42000 257610 35095
CHANDRAPURA TPSU7-8 DVC THERMAL-COAL 50000 306673 34987
KODERMA TPS DVC THERMAL-COAL 100000 380180 38131
PANCHET HPS DVC HYDRO-HYDRO 8000 13360 17984
TILLAYA HPS DVC HYDRO-HYDRO 400 1410 17984
RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34700 35400
TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 277300 23200
TLDP -III NHPC LTD HYDRO-HYDRO 13200 55400 62000
TLDP -IV NHPC LTD HYDRO-HYDRO 16000 60300 25600
FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 957219 33700
FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 308943 41000
BONGAINGAON TPS NTPC LTD THERMAL-COAL 25000 153663 58600
KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 542277 34200
KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 942591 34200
BARH-II NTPC LTD THERMAL-COAL 132000 728021 44500
TALCHER TPS NTPC LTD THERMAL-COAL 46000 335521 30100
TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 702319 25600
TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1436521 24700
STATE SECTOR
BTPS(RampM) BIHAR STATE PGCL THERMAL-COAL 22000 12142 39700
BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 98331 10602
HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 50593 9482
CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 19689 2605
RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 53192 6033
UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 147208 14637
Page 40
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 60353 4519
IB TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 288567 25000
J P H GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 210 038 61100
MEYONG CHU GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 400 1086 61100
TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 122667 38200
DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 214339 43321
KOLAGHAT THERMAL POWER
STATION
WEST BENGAL PDCL THERMAL-COAL 126000 538269 31603
BAKRESHWAR THERMAL POWER
PLANT
WEST BENGAL PDCL THERMAL-COAL 105000 634876 32154
BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 45000 166855 33299
SANTHALDIH THERMAL POWER
STATION
WEST BENGAL PDCL THERMAL-COAL 50000 336442 34932
SAGARDIGHI THERMAL POWER
PROJECT
WEST BENGAL PDCL THERMAL-COAL 160000 423121 34705
JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 20344 68900
RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 24559 68900
TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 4623 68900
PURULIA PUMPED STORAGE
PROJECT
WEST BENGAL SEDCL HYDRO-HYDRO 90000 108816 68900
MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2768 68900
PRIVATE SECTOR
CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 49474 20230
CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 555500 70200
HALDIA ENERGY HALDIA ENERGY LTD THERMAL-COAL 60000 371000 50400
DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3688 63400
KAMALANGA TPS GMR KAMALANGA ENERGY LTD THERMAL-COAL 105000547670
33300
ADHUNIK POWER U-1 ADHUNIK POWER THERMAL-COAL 27000 158 44060
ADHUNIK POWER U-2 ADHUNIK POWER THERMAL-COAL 27000 168 44250
VL-JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 332800 23622
JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 43000 45250
JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 71700 37030
JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 70700 35920
JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 71100 38870
JOJOBERA UNIT 5 TATA POWER COM LTD THERMAL-COAL 12000 79300 44560
JOJOBERA UNIT 6 TATA POWER COM LTD THERMAL-WHR 12000 83700 12840
IEL KALINGANAGAR U-I TATA POWER COM LTD THERMAL-WG 6750 33400 22500
IEL KALINGANAGAR U-II TATA POWER COM LTD THERMAL-WG 6750 34800 22500
MAITHON UNIT 1 amp 2 TATA POWER COM LTD THERMAL-COAL 105000 678000 36100
HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 27500 24340
HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 28400 24340
HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 15800 24310
NORTH EASTERN REGION
CENTRAL SECTOR
LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 74100 36600
AGARTALA GT NEEPCO THERMAL-GAS 13500 88611 27210
ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 153111 32310
DOYANG HEP NEEPCO HYDRO-HYDRO 7500 25598 49801
KOPILI HEP NEEPCO HYDRO-HYDRO 20000 98186 11491
KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 19582 20237
KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 10310 17968
RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 124093 22945
TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 10100 17344 39000
STATE SECTOR
HYDRO POWER (122 Stns) ITANAGAR GOVT OF ARUNACHAL
PRADESHHYDRO-HYDRO 6971 6217270
24600
KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39514 17337
LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 82327 36810
NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 33318 48290
MYNTRIANG SHEP ST II ASSAM POWER GENCO HYDRO-HYDRO 300 567 35776
LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 9130 49200
LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 012 49200
DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 022 49200
TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 000 49200
UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 4990 16000
UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 6476 37000
UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 16494 14600
UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 3600 9556 15000
SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 758 8000
MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44070 44800
KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 154 41400
TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 091 41400
MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 411 41400
MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 394 41400
KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 760 41400
SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 3264 41400
LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 044 41400
BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 18953 28000
ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 43585 28200
GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 4080 11100
Note
LIG Lignite N Naptha WHR Waste Heat Recovery
Page 41
File NoCEA-CH-14-1142018-Coordination Division
Figures in MW
TARGET ACH TARGET ACH TARGET ACH TARGET ACH
CENTRAL 14878 15869 6004 2584 5300 2000 26182 20453
STATE 13922 22201 1608 2276 0 0 15530 24477
PRIVATE 43540 53661 3285 619 0 0 46825 54280
ALL INDIA 72340 91730 10897 5479 5300 2000 88537 99209
Figures in MW
Thermal Hydro Nuclear Total
Target Ach Target Ach Target Ach Target Ach
Central 4880 3170 800 390 500 6180 3560 5761
State 3546 1760 300 200 0 3846 1960 5096
Private 2940 3780 205 205 0 3145 3985 12671
Total 11366 8710 1305 795 500 0 13171 9505 7217
12
2 CAPACITY ADDITION TARGET AND ACHIEVEMENT FOR 2017-18 (IN MW)
1 Capacity Addtion Targets and Achievements in the 12th Plan
SECTORTHERMAL HYDRO NUCLEAR TOTAL
File NoCEA-CH-14-1142018-Coordination Division
(MW)
Cummulative
Deviation
Target Achievement Target Achievement (+) (-)
Central 2760 250 0 250 0 -250
State 450615 1030 0 1030 69755 -960245
Private 0 0 600 0 600 600
Total 726615 1280 600 1280 669755 -610245
Central 710 0 0 110 110 0
State 130 0 0 12999 30 -9999
Private 0 0 0 0 0 0
Total 840 0 0 23999 140 -9999
Nuclear Central 0 0 0 0 0 0
Central 3470 250 0 360 110 -250
State 463615 1030 0 115999 99755 -1060235
Private 0 0 600 0 600 600
Total 810615 1280 600 151999 809755 -710235
Electricity Generation (MU) Targets and Achievements for 2016-17
13
2 Capacity Addition Targets Achievements During Oct-2018
Schemes Sector
Target 2018-19
April 2018- Oct 2018Oct-18
Hydro
All India
Capacity Addition TargetsAchievements during the Month of Oct-2018
Thermal
12
80
24
0
0
15
20
67
0
14
0
0
81
0
0
200
400
600
800
1000
1200
1400
1600
Thermal Hydro Nuclear Total
MW
Targets and Achievement during 2018-19Target Achievement
600
0 00 0
600
0
100
200
300
400
500
600
700
800
900
1000
Target Achievement
MW
Targets and Achievement during Oct 2018Thermal Hydro
Nuclear Total
File NoCEA-CH-14-1142018-Coordination Division
Coal Gas Diesel Total
State 1593400 287920 000 1881320 000 869755 68956 2820031
Private 2276083 55800 000 2331883 000 251400 1261535 3844818
Central 1258537 234406 000 1492943 162000 849622 32900 2537465
Sub Total 5128020 578126 000 5706146 162000 1970777 1363391 9202314
State 2128000 284982 000 2412982 000 544650 31119 2988751
Private 3488567 467600 000 3956167 000 48100 2005170 6009437
Central 1504295 328067 000 1832362 184000 162000 66130 2244492
Sub Total 7120862 1080649 000 8201511 184000 754750 2102418 11242679
State 1943250 79198 28788 2051236 000 1183803 52102 3287141
Private 1212450 532210 47370 1792030 000 000 3495815 5287845
Central 1422502 35958 000 1458460 332000 000 49190 1839650
Sub Total 4578202 647366 76158 5301726 332000 1183803 3597107 10414636
State 695000 10000 000 705000 000 353792 22511 1081303
Private 637500 000 000 637500 000 39900 84853 762253
Central 1387664 000 000 1387664 000 100520 1000 1489184
Sub Total 2720164 10000 000 2730164 000 494212 108364 3332740
State 000 49771 3600 53371 000 42200 25674 121245
Private 000 2450 000 2450 000 000 2571 5021
Central 52002 125360 000 177362 000 103000 500 280862
Sub Total 52002 177581 3600 233183 000 145200 28745 407128
State 000 000 4005 4005 000 000 525 4530
Private 000 000 000 000 000 000 221 221
Central 000 000 000 000 000 000 510 510
Sub Total 000 000 4005 4005 000 000 1256 5261
State 6359650 711871 36393 7107913 000 2994200 200887 10303000
Private 7614600 1058060 47370 8720030 000 339400 6850164 15909594
Central 5625000 723791 000 6348791 678000 1215142 150230 8392163
Total 19599250 2493722 83763 22176734 678000 4548742 7201281 34604757
Figures at decimal may not tally due to rounding off
Note -
(As per latest information available with MNRE)
Break up of RES all India as on 30092018 is given below (in MW)
450695 3461510 2402166 7201281
A Oct 2018 669755 MW
B Capacity Retired
during
Oct 2018 705 MW
C Oct 2018 0 MW
D Oct 2018 A-B+C -35245 MW
Share of Telangana from JEGURUPADU CCPP Ph II has been removed and the same has been added to private sector of Andhra Pradesh due to expiry of PPA as per
request from TS Transco
Region
ALL INDIA INSTALLED CAPACITY (IN MW) OF POWER STATIONS (As on 31102018)
(UTILITIES)
Net Capacity Added during
1 RES include SHP BP UampI Solar and Wind Energy Installed capacity in respect of RES (MNRE) as on 30092018
Small
Hydro PowerWind Power
Bio-PowerSolar Power
Total
CapacityBM PowerCogen Waste to Energy
2 U-1 to 7 (76995=69755 MW) of LAKWA REPLACEMENT POWER PROJECT commissioned in April 2018 but intimated in October 2018
has been added to state sector of Assam
1 Badarpur TPS (705 MW) has been retired from central sector of Northern Region
Capacity Up-rated
Ownership Sector
873080 13830
Capacity Added during
1 U-2 (600 MW) of MAHAN TPP has been commissioned and added to private sector of Madhya Pradesh
Grand TotalThermalNuclear Hydro
Islands
ALL INDIA
Abbreviation- SHP=Small Hydro Project (le 25 MW) BP=Biomass Power UampI=Urban amp Industrial Waste Power RES=Renewable Energy Sources
Northern Region
Western Region
Southern Region
Eastern Region
North Eastern
Region
RES
(MNRE)
Modewise breakup
File NoCEA-CH-14-1142018-Coordination Division
Coal Gas Diesel Total
State 13500 180040 000 193540 000 000 000 193540
Private 86922 10800 000 97722 000 000 12157 109879
Central 311272 20701 000 331973 10283 72309 000 414565
Sub-Total 411694 211541 000 623235 10283 72309 12157 717984
State 272000 15000 000 287000 000 110282 5930 403212
Private 408078 000 000 408078 000 20000 34745 462823
Central 129472 53561 000 183034 10094 66370181 500 259998
Sub-Total 809550 68561 000 878112 10094 196652 41175 1126032
State 000 000 000 000 000 69460 25661 95121
Private 000 000 000 000 000 99200 60536 159736
Central 18340 6201 000 24541 2895 122388 000 149824
Sub-Total 18340 6201 000 24541 2895 291048 86197 404681
State 000 17500 000 17500 000 123000 12903 153403
Private 000 000 000 000 000 000 5985 5985
Central 50639 12907 000 63547 6798 109188 000 179533
Sub-Total 50639 30407 000 81047 6798 232188 18888 338921
State 176000 15000 000 191000 000 259770 12780 463550
Private 511550 000 000 511550 000 28800 115462 655812
Central 85458 26401 000 111859 19681 92342 000 223882
Sub-Total 773008 41401 000 814409 19681 380912 128242 1343244
State 585000 60380 000 645380 000 109618 2385 757383
Private 388200 000 000 388200 000 10400 710680 1109280
Central 120625 22110 000 142735 55674 73901 29400 301710
Sub-Total 1093825 82490 000 1176315 55674 193919 742465 2168373
State 546900 000 000 546900 000 72410 2510 621820
Private 871433 000 000 871433 000 84200 266691 1222324
Central 379639 54949 000 434588 28948 180253 3000 646789
Sub-Total 1797972 54949 000 1852921 28948 336863 272201 2490933
State 000 000 000 000 000 125215 6787 132002
Private 9900 45000 000 54900 000 8800 52244 115944
Central 34324 6966 000 41290 3124 47554 000 91968
Sub-Total 44224 51966 000 96190 3124 181569 59031 339914
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 3035 3035
Central 3815 1503 000 5317 801 10171 000 16289
Sub-Total 3815 1503 000 5317 801 10171 3035 19324
124953 29105 000 154058 23703 75145 000 252907
State 1593400 287920 000 1881320 000 869755 68956 2820031
Private 2276083 55800 000 2331883 000 251400 1261535 3844818
Central 1258537 234406 000 1492943 162000 849622 32900 2537465
Grand Total 5128020 578126 000 5706146 162000 1970777 1363391 9202314
Uttar Pradesh
Uttarakhand
Chandigarh
Grand TotalThermalNuclear
Hydro
(Renewable)
RES
(MNRE)
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
NORTHERN REGION
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
(As on 31102018)
Central - Unallocated
Total (Northern
Region)
Delhi
Haryana
Himachal Pradesh
Jammu amp Kashmir
Punjab
Rajasthan
State Ownership Sector
Modewise breakup
File NoCEA-CH-14-1142018-Coordination Division
(As on 31102018)
Coal Gas Diesel Total
State 000 000 000 000 000 000 005 005
Private 000 4800 000 4800 000 000 091 4891
Central 45478 1967 000 47445 2600 000 000 50045
Sub-Total 45478 6767 000 52245 2600 000 096 54941
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 1301 1301
Central 12663 4334 000 16997 700 000 000 17697
Sub-Total 12663 4334 000 16997 700 000 1301 18998
State 475000 217782 000 692782 000 77200 800 770782
Private 776567 396000 000 1172567 000 000 729782 1902349
Central 309051 42400 000 351451 55900 000 23830 431181
Sub-Total 1560618 656182 000 2216800 55900 77200 754412 3104312
State 408000 000 000 408000 000 170366 8396 586762
Private 617400 10000 000 627400 000 000 378205 1005605
Central 279441 25700 000 305141 27300 152000 30000 514441
Sub-Total 1304841 35700 000 1340541 27300 322366 416601 2106808
State 228000 000 000 228000 000 12000 1105 241105
Private 849000 000 000 849000 000 000 52430 901430
Central 195344 000 000 195344 4800 10000 000 210144
Sub-Total 1272344 000 000 1272344 4800 22000 53535 1352679
State 1017000 67200 000 1084200 000 285084 20813 1390097
Private 1245600 56800 000 1302400 000 48100 842815 2193315
Central 433475 227273 000 660748 69000 000 12300 742048
Sub-Total 2696075 351273 000 3047348 69000 333184 875927 4325459
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 546 546
Central 17444 6634 000 24078 900 000 000 24978
Sub-Total 17444 6634 000 24078 900 000 546 25524
211400 19759 000 231159 22800 000 000 253959
State 2128000 284982 000 2412982 000 544650 31119 2988751
Private 3488567 467600 000 3956167 000 48100 2005170 6009437
Central 1504295 328067 000 1832362 184000 162000 66130 2244492
Grand Total 7120862 1080649 000 8201511 184000 754750 2102418 11242679
Central - Unallocated
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
WESTERN REGION
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
State Ownership Sector
Modewise breakup
Grand TotalThermalNuclear
Hydro
(Renewable)
RES
(MNRE)
Total (Western
Region)
Goa
Daman amp Diu
Gujarat
Madhya Pradesh
Chhattisgarh
Maharashtra
Dadra amp Nagar
Naveli
File NoCEA-CH-14-1142018-Coordination Division
(As on 31102018)
Coal Gas Diesel Total
State 501000 23540 000 524540 000 167360 4875 696775
Private 387388 381318 3680 772386 000 000 693073 1465459
Central 167456 000 000 167456 12727 000 25000 205183
Sub-Total 1055844 404858 3680 1464382 12727 167360 722948 2367417
State 508250 000 000 508250 000 247993 4022 760265
Private 83945 83182 000 167127 000 000 375048 542175
Central 195612 000 000 195612 14873 000 1000 211485
Sub-Total 787807 83182 000 870989 14873 247993 380070 1513925
State 502000 000 12792 514792 000 359980 15533 890305
Private 195850 000 2520 198370 000 000 1275640 1474010
Central 282920 000 000 282920 69800 000 000 352720
Sub-Total 980770 000 15312 996082 69800 359980 1291173 2717035
State 000 000 15996 15996 000 188150 15402 219548
Private 61500 17400 000 78900 000 000 20899 99799
Central 114322 35958 000 150280 36200 000 5000 191480
Sub-Total 175822 53358 15996 245176 36200 188150 41301 510827
State 432000 52408 000 484408 000 220320 12270 716998
Private 483767 50310 41170 575247 000 000 1130984 1706231
Central 448952 000 000 448952 144800 000 18190 611942
Sub-Total 1364719 102718 41170 1508607 144800 220320 1161444 3035171
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 000 000
Central 10000 000 000 10000 000 000 000 10000
Sub-Total 10000 000 000 10000 000 000 000 10000
State 000 3250 000 3250 000 000 000 3250
Private 000 000 000 000 000 000 171 171
Central 24840 000 000 24840 8600 000 000 33440
Sub-Total 24840 3250 000 28090 8600 000 171 36861
178400 000 000 178400 45000 000 000 223400
State 1943250 79198 28788 2051236 000 1183803 52102 3287141
Private 1212450 532210 47370 1792030 000 000 3495815 5287845
Central 1422502 35958 000 1458460 332000 000 49190 1839650
Grand Total 4578202 647366 76158 5301726 332000 1183803 3597107 10414636
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
SOUTHERN REGION
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
State Ownership Sector
Modewise breakup
Grand TotalThermal RES
(MNRE)Nuclear
Hydro
(Renewable)
Kerala
Tamil Nadu
NLC
Puducherry
Central - Unallocated
Total (Southern
Region)
Andhra Pradesh
Telangana
Karnataka
File NoCEA-CH-14-1142018-Coordination Division
(As on 31102018)
Coal Gas Diesel Total
State 71000 000 000 71000 000 000 7070 78070
Private 28100 000 000 28100 000 000 25545 53645
Central 291433 000 000 291433 000 11000 000 302432
Sub-Total 390533 000 000 390533 000 11000 32615 434147
State 42000 000 000 42000 000 13000 405 55405
Private 73000 000 000 73000 000 000 3207 76207
Central 39374 000 000 39374 000 6100 000 45474
Sub-Total 154374 000 000 154374 000 19100 3612 177086
State 540000 10000 000 550000 000 98600 9195 657795
Private 242500 000 000 242500 000 000 34452 276952
Central 76077 000 000 76077 000 41000 000 117077
Sub-Total 858577 10000 000 868577 000 139600 43647 1051824
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 000 000
Central 698504 000 000 698504 000 18620 000 717124
Sub-Total 698504 000 000 698504 000 18620 000 717124
State 42000 000 000 42000 000 206192 630 248822
Private 293900 000 000 293900 000 000 21648 315548
Central 163390 000 000 163390 000 8900 1000 173290
Sub-Total 499290 000 000 499290 000 215092 23278 737660
State 000 000 000 000 000 36000 5211 41211
Private 000 000 000 000 000 39900 001 39901
Central 8703 000 000 8703 000 6400 000 15103
Sub-Total 8703 000 000 8703 000 82300 5212 96215
110183 000 000 110183 000 8501 000 118684
State 695000 10000 000 705000 000 353792 22511 1081303
Private 637500 000 000 637500 000 39900 84853 762253
Central 1387664 000 000 1387664 000 100520 1000 1489184
Grand Total 2720164 10000 000 2730164 000 494212 108364 3332740
(As on 31102018)
Coal Gas Diesel Total
State 000 32821 000 32821 000 10000 3001 45822
Private 000 2450 000 2450 000 000 1680 4130
Central 27902 43556 000 71458 000 36851 000 108309
Sub-Total 27902 78827 000 106729 000 46851 4681 158261
State 000 000 000 000 000 000 10710 10710
Private 000 000 000 000 000 000 539 539
Central 2470 4682 000 7152 000 11800 000 18952
Sub-Total 2470 4682 000 7152 000 11800 11249 30201
State 000 000 000 000 000 32200 3103 35303
Private 000 000 000 000 000 000 006 006
Central 3040 10969 000 14009 000 7446 000 21455
Sub-Total 3040 10969 000 14009 000 39646 3109 56764
State 000 16950 000 16950 000 000 1601 18551
Private 000 000 000 000 000 000 009 009
Central 3740 43695 000 47435 000 7077 500 55012
Sub-Total 3740 60645 000 64385 000 7077 2110 73572
State 000 000 3600 3600 000 000 545 4145
Private 000 000 000 000 000 000 217 217
Central 3140 7157 000 10297 000 9677 000 19974
Sub-Total 3140 7157 3600 13897 000 9677 762 24336
State 000 000 000 000 000 000 3067 3067
Private 000 000 000 000 000 000 100 100
Central 2140 4893 000 7033 000 5860 000 12893
Sub-Total 2140 4893 000 7033 000 5860 3167 16060
State 000 000 000 000 000 000 3647 3647
Private 000 000 000 000 000 000 020 020
Central 2070 4046 000 6116 000 9913 000 16029
Sub-Total 2070 4046 000 6116 000 9913 3667 19696
7500 6362 000 13862 000 14376 000 28238
State 000 49771 3600 53371 000 42200 25674 121245
Private 000 2450 000 2450 000 000 2571 5021
Central 52002 125360 000 177362 000 103000 500 280862
Grand Total 52002 177581 3600 233183 000 145200 28745 407128
Central - Unallocated
Total (Eastern
Region)
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
NORTH-EASTERN REGION
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
State Ownership Sector
Modewise breakup
Grand TotalThermalNuclear
Bihar
Jharkhand
West Bengal
DVC
Odisha
Sikkim
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
EASTERN REGION
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
Ownership Sector
Modewise breakup
Grand TotalThermalNuclear
Hydro
(Renewable)
RES
(MNRE)
Manipur
Nagaland
State
Mizoram
Central - Unallocated
Total (North-
Eastern Region)
Hydro
(Renewable)
RES
(MNRE)
Assam
Arunachal Pradesh
Meghalaya
Tripura
File NoCEA-CH-14-1142018-Coordination Division
(As on 31102018)
Coal Gas Diesel Total
State 000 000 4005 4005 000 000 525 4530
Private 000 000 000 000 000 000 146 146
Central 000 000 000 000 000 000 510 510
Sub-Total 000 000 4005 4005 000 000 1181 5186
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 075 075
Central 000 000 000 000 000 000 000 000
Sub-Total 000 000 000 000 000 000 075 075
State 000 000 4005 4005 000 000 525 4530
Private 000 000 000 000 000 000 221 221
Central 000 000 000 000 000 000 510 510
Grand Total 000 000 4005 4005 000 000 1256 5261
19
Andaman amp
Nicobar
lakshadweep
Total (Islands)
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
State Ownership Sector
Modewise breakup
Grand TotalThermalNuclear
Hydro
(Renewable)
RES
(MNRE)
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
ISLANDS
File NoCEA-CH-14-1142018-Coordination Division
SrNo Contents Page
1 Executive summary of Target and Achievement of Transmission Lines during 2018-19
20(1)
2 List of Transmission Lines CommissionedReady for commissioning during Oct-2018 20(2)
Section C - Transmission Lines
File NoCEA-CH-14-1142018-Coordination Division
Executive summary of Target and Achievement of Transmission Lines during 2018-19 As on Oct-18
(All figures in circuit kms)
Centr
al S
ecto
r
Sta
te S
ecto
r
JV
Private
Secto
r
To
tal
Centr
al S
ecto
r
Sta
te S
ecto
r
JV
Private
Secto
r
To
tal
Centr
al S
ecto
r
Sta
te S
ecto
r
JV
Private
Secto
r
To
tal
Centr
al S
ecto
r
Sta
te S
ecto
r
JV
Private
Secto
r
To
tal
Centr
al S
ecto
r
Sta
te S
ecto
r
JV
Private
Secto
r
To
tal
Cen
tral S
ecto
r
Sta
te S
ecto
r
JV
Pri
vate
Secto
r
Gra
nd
To
tal
0 0 0 0 0 0 0 0 4692 766 827 6285 3045 5906 980 9931 553 5878 0 6431 8290 12550 1807 22647
Oct18 Programme 0 0 0 0 0 0 0 0 300 0 0 300 662 90 562 1314 0 723 0 723 962 813 562 2337
Achievement 0 0 0 0 0 0 0 0 729 0 0 729 471 266 0 737 0 401 0 401 1200 667 0 1867
Upto Oct-18 Programme 0 0 0 0 0 0 0 0 3004 416 0 3420 1350 3109 562 5021 481 4346 0 4827 4835 7871 562 13268
Achievement 0 0 0 0 0 0 0 0 2286 0 178 2464 1436 1783 1595 4814 60 4461 0 4521 3782 6244 1773 11799
20(1)
220 kV Grand Total 800 kV 500 kV
Programme 2018-19
Programme
Achievement
HVDC765 kV 400 kV
File NoCEA-CH-14-1142018-Coordination Division
SlNo Line
Length
(cKM)
1 2 3 4 5 6
1 765 Jharsuguda - Dharamjaygarh line DC PGCIL 296
2 765LILO of Kurnool - Thirvualam line at
CuddapahDC PGCIL 190
3 765 Salem PS - Madhugiri PS line SC PGCIL 243
4 400 Cuddapah - Hindupur line (Q) DC PGCIL 338
5 400LILO of Both Ckt of Bamnauli - Samaypur at
TughlakabadMC PGCIL 114
6 400LILO-Out of Cuddapah - Hindupur line (Q)
(Both Ckts) at NP Kunta ssDC PGCIL 19
1200
7 400LILO of Sterlite - Meramundali at Lapanga
4oo kV ssDC OPTCL 14
8 400 Sterlite - Lapanga line DC OPTCL 37
9 400 TMDC Podili - Sattapenalli line DC APTRANSCO 215
10 230Neyveli 230110 kV ss - Eachangadu
230kV FeederSC TANTRANSCO 1
11 230 NNTPS - Neyveli 230110kV ss DC TANTRANSCO 2
12 220 Ajmer (400 kV) - Bherunda (TK) DC RVPNL 100
13 220 Aligarh - Atrauli line DC UPPTCL 77
14 220 Khandwa - Chhanera line DC MPPTCL 78
15 220LILO of one Ckt of Hadala - Sartanpar line
at Wankaner on MC towersDC GETCO 6
16 220 LILO of one Ckt of Vita - Miraj at Alkud ss DC MSETCL 27
17 220 Mendhigiri - Alkud ss DC MSETCL 110
667
1867
20(2)
Grand Total
2Transmission Lines (220 kV and above) CommissionedReady for commissioning During Oct-2018
As on 31-10-18
Voltage
Level (kV)Name of Transmission Lines
Circuit
Type
Executing
Agency
CENTRAL SECTOR
Total of CENTRAL SECTOR
STATE SECTOR Sector
Total of STATE SECTOR
File NoCEA-CH-14-1142018-Coordination Division
SN Contents Page
1 Executive summary of Target and Achievement of Substations during 2018-19 21(1)
2Sub Stations (220 kV and above) commissionedready for commisssioning during Oct-
201821(2)
Section D - Sub Stations
File NoCEA-CH-14-1142018-Coordination Division
1 Executive summary of Target and Achievement of Substations during 2018-19 As on Oct-18
(All figures in circuit MVA)
Centr
al S
ecto
r
Sta
te S
ecto
r
JV
Private
Secto
r
To
tal
Centr
al S
ecto
r
Sta
te S
ecto
r
JV
Private
Secto
r
To
tal
Centr
al S
ecto
r
Sta
te S
ecto
r
JV
Private
Secto
r
To
tal
Centr
al S
ecto
r
Sta
te S
ecto
r
JV
Private
Secto
r
To
tal
Centr
al S
ecto
r
Sta
te S
ecto
r
JV
Private
Secto
r
To
tal
Cen
tral S
ecto
r
Sta
te S
ecto
r
JV
Pri
vate
Secto
r
Gra
nd
To
tal
3000 0 0 3000 0 0 0 0 22200 0 0 22200 8185 13085 630 21900 740 14760 0 15500 34125 27845 630 62600
Oct18 Programme 0 0 0 0 0 0 0 0 0 0 0 0 1000 1260 630 2890 0 1400 0 1400 1000 2660 630 4290
Achievement 0 0 0 0 0 0 0 0 3000 0 0 3000 1500 3120 0 4620 0 2220 0 2220 4500 5340 0 9840
Upto Oct-18 Programme 0 0 0 0 0 0 0 0 10000 0 0 10000 6130 7435 630 14195 0 9670 0 9670 16130 17105 630 33865
Achievement 0 0 0 0 0 0 0 0 14000 0 0 14000 9000 7550 630 17180 0 10610 0 10610 23000 18160 630 41790
21(1)
220 kV Grand Total 800 kV 500 kV
Programme 2018-19
Programme
Achievement
HVDC765 kV 400 kV
File NoCEA-CH-14-1142018-Coordination Division
As on 31-10-18
Sl Voltage Ratio Capacity
No (kVkV) (MWMVA)
1 2 3 4 5
1 Cuddapah Ss 765400 PGCIL 3000
2 Tughlakabad SS (GIS) 400220 PGCIL 1500
Total of CENTRAL SECTOR 4500
3 Panki Kanpur (Aug) TF-I 400200 UPPTCL 75
4 Hindupur ss (1st ICT) 400220 APTRANSCO 315
5 Thappagundu ss 400110 TANTRANSCO 600
6 Mendhasal (2nd power TF) 400220 OPTCL 20
7 Jodhpur ss (New) 400220 RVPNL 315
8 Shankarpally 400220 TSTRANSCO 500
9 Podili ss (1st ICT) 400220 APTRANSCO 315
10 Doni (Gadag)SS 400220 KPTCL 1000
11 Porur (Addl TF) 230110 TANTRANSCO 100
12 Anuppankulam (Addl TF) 230110 TANTRANSCO 60
13 Neyveli SS 230110 TANTRANSCO 480
14 Savarkundla (Aug) 22066 GETCO 60
15 Bhuna (Aug) 220132 HVPNL 100
16 Madanpur (Aug) 22066 HVPNL 100
17 Gurgaon Sec-52A (Aug) 22066 HVPNL 160
18 IA Hisar (Aug) 220132 HVPNL 50
19 Narwana (Aug) 220132 HVPNL 60
20 Therubali (3rd Auto TF) 220132 OPTCL 160
21 Halasar ss 220132 RVPNL 160
22 Bansi Siddaharthnagar (Aug) TF-I 220132 UPPTCL 60
23 Hata Kushinagar (New) TF-I 220132 UPPTCL 100
24 Gomti nagar Lucknow (Aug) TF-IV 22033 UPPTCL 60
25 Kanpur Road Lucknow (New) TF-III 22033 UPPTCL 60
26 Asoj (Aug) 22066 GETCO 150
27 Kangasiyali (Aug) 22066 GETCO 60
28 Karmsad (Aug) 22066 GETCO 160
29 Lalpar (Aug) 22066 GETCO 60
TOTAL STATE SECTOR 5340
GRAND TOTAL 9840
21(2)
PRIVATE SECTOR
CENTRAL SECTOR
STATE SECTOR
2Sub-Stations (220 kV and above) CommissionedReady for commissioning During Oct-2018
Name of Sub StationsExecuting
Agency
File NoCEA-CH-14-1142018-Coordination Division
SN Contents Page
1 Electricity Generation (MU) Targets and Achievements for 2018-19 22
Section E - Electricity Generation
File NoCEA-CH-14-1142018-Coordination Division
Programme Achievement Ach Programme Achievement Ach
Central Sector 35160700 3028100 3162321 10443 20144400 21150469 10499
State Sector 35132000 3010000 3017260 10024 19922100 19549030 9813
PvtIPP Sector 36999700 3240600 3375603 10417 21598300 20794155 9628
PvtUTL Sector 1857600 164500 180597 10979 1130900 1203107 10638
Total 109150000 9443200 9735781 10310 62795700 62696761 9984
Central Sector 5617600 420900 451004 10715 4193000 4045436 9648
State Sector 6110600 559500 708469 12663 4049400 4433000 10947
PvtIPP Sector 1141800 80500 90122 11195 976400 1021963 10467
PvtUTL Sector 130000 11300 12564 11119 76700 99943 13030
Total 13000000 1072200 1262159 11772 9295500 9600342 10328
Central Sector 3850000 353300 303310 8585 2068900 2203540 10651
Total 3850000 353300 303310 8585 2068900 2203540 10651
Bhutan Import 500000 63300 35395 5592 347000 416660 12007
Central Sector 44628300 3802300 3916635 10301 26406300 27399445 10376
State Sector 41242600 3569500 3725729 10438 23971500 23982030 10004
Pvt Sector 40129100 3496900 3658886 10463 23782300 23119168 9721
Total 126500000 10932000 11336645 10370 74507100 74917303 10055
Provisional based on actual-cum-Assesment
Figs in MU
Cummulative
Achievement
Cummulative
Achievement
Sep-18 Sep-17 Upto Sep-2018 Upto Sep-2017
1073794 748889 7332680 5660929
22
Renewable Energy Generation
Achievement
Oct-2018
1 Electricity Generation (MU) Targets and Achievememts for 2018-19
All India Energy Generation During April 2018- Oct 2018 (MU)
Target (2018-19)April 2018- Oct 2018
Sector
Hydro
Thermal
Nuclear
627957
92955
20689
745071
626968
96003
22035
749173
0
100000
200000
300000
400000
500000
600000
700000
800000
Thermal Hydro Nuclear Total
Programme
Achievement
File NoCEA-CH-14-1142018-Coordination Division
SN Contents Page
1 Energy Power Supply Position (Provisional) for Oct-2018 and during April 2018- Oct 2018 23
2 Peak Power Supply Position (Provisional) for Oct-2018 and during April 2018- Oct 2018 24
3 Energy Power Supply Position (Revised) for Sep-2018 and during April 2018- Sept 2018 25
4 Peak Power Supply Position (Revised) for Sep-2018 and during April 2018- Sept 2018 26
5 Notified Power cuts Restrictions on Industries during Oct-2018 27
6 Power Supply to Agricultural Sector during Oct-2018 28
Section F - Power supply position
File NoCEA-CH-14-1142018-Coordination Division
आकड़ मममलयन यननट नट Figures in MU net
ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied
कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )
चडीगढ़ Chandigarh 108 108 0 00 1055 1055 0 00
दिलली Delhi 2490 2489 1 00 22524 22510 14 01
हरियजणज Haryana 4554 4554 0 00 35205 35205 0 00
दहमजचल परिश Himachal Pradesh 788 787 2 02 5728 5560 168 29
रमम कशमीि Jammu amp Kashmir 1497 1219 278 186 10982 8865 2117 193
परजब Punjab 4418 4418 0 00 38832 38819 13 00
िजरसथजन Rajasthan 6748 6748 0 00 45341 45181 160 04
उतति परिश Uttar Pradesh 10136 9973 164 16 75485 74808 676 09
उततिजखड Uttarakhand 1083 1081 3 03 8395 8310 85 10
उततरी कषतर Northern Region 31822 31375 447 14 243547 240314 3233 13
छततीसगढ़ Chhattisgarh 2454 2453 1 00 16119 16091 28 02
गरिजत Gujarat 11636 11636 0 00 70782 70768 14 00
मधय परिश Madhya Pradesh 5860 5859 1 00 38412 38410 2 00
महजिजषटर Maharashtra 15223 15095 128 08 95489 95355 134 01
िमन औि दिउ Daman amp Diu 216 216 0 00 1523 1523 0 00
िजिि व नगि हवली Dadra amp Nagar Haveli 553 553 0 00 3757 3757 0 00
गोवज Goa 366 366 0 00 2497 2495 2 01
पशचिमी कषतर Western Region 36308 36178 130 04 228579 228398 180 01
आनधर परिश Andhra Pradesh 5860 5854 6 01 37377 37334 43 01
तलगजनज Telangana 6748 6742 6 01 38251 38205 46 01
कनजाटक Karnataka 5842 5835 7 01 39111 39059 52 01
किल Kerala 2116 2096 20 09 14256 14160 96 07
तममल नजड Tamil Nadu 8611 8601 10 01 65742 65666 76 01
पडचिी Puducherry 216 215 1 05 1654 1646 8 05
लकष-दवीप Lakshadweep 4 4 0 0 27 27 0 0
दकषकषणी कषतर Southern Region 29392 29342 50 02 196390 196069 321 02
बबहजि Bihar 2742 2738 4 01 19143 18951 192 10
िजमोिि घजटी ननगम DVC 1712 1698 13 08 13096 12828 268 20
झजिखणड Jharkhand 701 697 4 06 5022 4949 73 15
ओडडशज Odisha 3147 3134 13 04 20224 20192 32 02
पशशचम बगजल West Bengal 4204 4200 4 01 33008 32881 127 04
मसशककम Sikkim 40 40 0 00 279 279 0 01
अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 67 202 188 13 67
परवी कषतर Eastern Region 12547 12507 40 03 90772 90080 692 08
अरणजचल परिश Arunachal Pradesh 67 66 1 09 502 496 7 13
असम Assam 833 809 24 29 6153 5903 250 41
मणणपि Manipur 72 71 1 10 485 478 7 14
मघजलय Meghalaya 147 147 0 00 1043 1042 0 00
ममज़ोिम Mizoram 63 62 1 08 365 359 5 14
नजगजलड Nagaland 76 67 8 110 540 481 59 109
बिपिज Tripura 130 129 1 09 1025 1007 19 18
उततर-परवी कषतर North-Eastern Region 1387 1351 35 25 10113 9766 346 34
समपणण भारत All India 111455 110753 702 06 769399 764627 4773 06
23
ऊराण वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Energy Power Supply Position Report (Provisional)
राजयStateअकरबर2018 October2018 अपरल2018 -अकरबर2018 April2018 to October2018
ऊरजा पनत ा म कमी ऊरजा पनत ा म कमीEnergy not Supplied
Excludes energy exported to Bangladesh
Energy not Supplied
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
File NoCEA-CH-14-1142018-Coordination Division
अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met
कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )
चडीगढ़ Chandigarh 217 217 0 00 369 369 0 00
दिलली Delhi 4713 4713 0 00 7016 7016 0 00
हरियजणज Haryana 7948 7948 0 00 10270 10270 0 00
दहमजचल परिश Himachal Pradesh 1520 1520 0 00 1520 1520 0 00
रमम कशमीि Jammu amp Kashmir 2836 2269 567 200 2951 2361 590 200
परजब Punjab 7979 7979 0 00 12638 12638 0 00
िजरसथजन Rajasthan 11450 11450 0 00 11698 11698 0 00
उतति परिश Uttar Pradesh 17434 16745 688 39 20498 20062 436 21
उततिजखड Uttarakhand 1943 1943 0 00 2143 2143 0 00
उततरी कषतर Northern Region 50659 49635 1024 20 63166 61726 1440 23
छततीसगढ़ Chhattisgarh 4414 4268 146 33 4414 4268 146 33
गरिजत Gujarat 18148 18130 19 01 18148 18130 19 01
मधय परिश Madhya Pradesh 11356 11317 39 03 11356 11317 39 03
महजिजषटर Maharashtra 23864 23159 705 30 23864 23254 610 26
िमन औि दिउ Daman amp Diu 342 341 1 02 357 356 1 02
िजिि व नगि हवली Dadra amp Nagar Haveli 784 780 4 05 816 815 1 01
गोवज Goa 536 536 0 00 596 596 0 00
पशचिमी कषतर Western Region 56548 55695 853 15 56548 55695 853 15
आनधर परिश Andhra Pradesh 9435 9435 0 00 9435 9435 0 00
तलगजनज Telangana 10603 10603 0 00 10815 10815 0 00
कनजाटक Karnataka 10741 10741 0 00 10741 10741 0 00
किल Kerala 3727 3644 83 22 4050 3997 53 13
तममल नजड Tamil Nadu 14747 14333 414 28 15029 14981 47 03
पडचिी Puducherry 363 362 1 03 420 400 19 46
लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0
दकषकषणी कषतर Southern Region 45279 45226 53 01 45946 45684 262 06
बबहजि Bihar 4945 4945 0 00 5050 5045 5 01
िजमोिि घजटी ननगम DVC 2729 2729 0 00 2874 2874 0 00
झजिखणड Jharkhand 1260 1260 0 00 1339 1284 55 41
ओडडशज Odisha 5624 5224 400 71 5624 5357 268 48
पशशचम बगजल West Bengal 8775 8775 0 00 9130 9123 7 01
मसशककम Sikkim 86 86 0 00 90 90 0 00
अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7
परवी कषतर Eastern Region 22959 22567 392 17 22959 22567 392 17
अरणजचल परिश Arunachal Pradesh 138 125 13 94 138 133 5 37
असम Assam 1785 1704 81 45 1865 1809 56 30
मणणपि Manipur 187 185 2 11 193 186 7 36
मघजलय Meghalaya 336 336 0 00 371 368 2 07
ममज़ोिम Mizoram 99 97 2 20 103 98 4 41
नजगजलड Nagaland 134 131 3 22 156 138 18 117
बिपिज Tripura 269 269 0 00 298 293 5 17
उततर-परवी कषतर North-Eastern Region 2790 2700 90 32 2967 2850 117 39
समपणण भारत All India 172945 170604 2341 14 177022 175528 1494 08
24
अधिकतम वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Peak Power Supply Position Report (Provisional)
आकड़ मगज वजट नट Figures in MW netअपरल2018 -अकरबर2018 April2018 to October2018
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
मजग की पनता म कमी Demand not Met
Excludes the supply to Bangladesh
राजयStateअकरबर2018 October2018
मजग की पनता म कमी Demand not Met
File NoCEA-CH-14-1142018-Coordination Division
आकड़ मममलयन यननट नट Figures in MU net
ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied
कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )
चडीगढ़ Chandigarh 141 141 0 00 947 947 0 00
दिलली Delhi 2925 2924 1 00 20034 20021 13 01
हरियजणज Haryana 4794 4794 0 00 30651 30651 0 00
दहमजचल परिश Himachal Pradesh 876 853 24 27 4940 4773 167 34
रमम कशमीि Jammu amp Kashmir 1520 1246 274 180 9485 7646 1839 194
परजब Punjab 5575 5575 0 00 34414 34401 13 00
िजरसथजन Rajasthan 6202 6201 0 00 38594 38434 160 04
उतति परिश Uttar Pradesh 10211 10124 86 08 65349 64836 513 08
उततिजखड Uttarakhand 1162 1149 13 11 7311 7229 82 11
उततरी कषतर Northern Region 33405 33008 398 12 211725 208939 2786 13
छततीसगढ़ Chhattisgarh 2403 2388 15 06 13665 13638 27 02
गरिजत Gujarat 10122 10122 0 00 59146 59132 14 00
मधय परिश Madhya Pradesh 5492 5491 1 00 32552 32551 1 00
महजिजषटर Maharashtra 13615 13612 3 00 80266 80260 6 00
िमन औि दिउ Daman amp Diu 221 221 0 00 1306 1306 0 00
िजिि व नगि हवली Dadra amp Nagar Haveli 551 551 0 00 3204 3204 0 00
गोवज Goa 339 339 0 00 2131 2128 2 01
पशचिमी कषतर Western Region 32742 32723 19 01 192270 192220 50 00
आनधर परिश Andhra Pradesh 5294 5287 7 01 31518 31480 37 01
तलगजनज Telangana 6279 6272 8 01 31503 31463 40 01
कनजाटक Karnataka 5701 5693 8 01 33269 33225 45 01
किल Kerala 2050 2026 24 12 12140 12063 76 06
तममल नजड Tamil Nadu 8971 8959 12 01 57131 57065 66 01
पडचिी Puducherry 226 224 2 08 1438 1431 7 05
लकष-दवीप Lakshadweep 4 4 0 0 23 23 0 0
दकषकषणी कषतर Southern Region 28520 28460 60 02 166998 166727 271 02
बबहजि Bihar 2839 2793 46 16 16400 16213 188 11
िजमोिि घजटी ननगम DVC 1901 1750 151 79 11384 11130 254 22
झजिखणड Jharkhand 740 723 17 22 4321 4252 69 16
ओडडशज Odisha 2921 2918 3 01 17077 17058 19 01
पशशचम बगजल West Bengal 4902 4879 23 05 28804 28681 123 04
मसशककम Sikkim 39 39 0 01 239 239 0 01
अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 67 173 162 12 67
परवी कषतर Eastern Region 13341 13102 240 18 78225 77573 652 08
अरणजचल परिश Arunachal Pradesh 74 73 1 10 435 429 6 14
असम Assam 950 914 36 38 5320 5094 226 43
मणणपि Manipur 70 69 1 11 414 408 6 15
मघजलय Meghalaya 150 150 0 01 896 896 0 01
ममज़ोिम Mizoram 58 57 1 12 302 297 5 16
नजगजलड Nagaland 80 72 8 104 464 414 50 108
बिपिज Tripura 192 191 1 07 895 878 17 19
उततर-परवी कषतर North-Eastern Region 1575 1527 48 31 8726 8415 311 36
समपणण भारत All India 109584 108819 765 07 657944 653873 4071 06
Energy not Supplied Energy not Supplied
ससतबर2018 September2018 अपरल2018 -ससतबर2018 April2018 to September2018
ऊरजा पनत ा म कमी ऊरजा पनत ा म कमी
Excludes energy exported to Bangladesh
राजयState
ऊराण वरवदयत आपरतण शथिरत ररपोरण (सशोधित) Energy Power Supply Position Report (Revised)
25
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
File NoCEA-CH-14-1142018-Coordination Division
अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met
कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )
चडीगढ़ Chandigarh 293 293 0 00 369 369 0 00
दिलली Delhi 5358 5358 0 00 7016 7016 0 00
हरियजणज Haryana 9008 9008 0 00 10270 10270 0 00
दहमजचल परिश Himachal Pradesh 1466 1466 0 00 1479 1479 0 00
रमम कशमीि Jammu amp Kashmir 2951 2361 590 200 2951 2361 590 200
परजब Punjab 11405 11405 0 00 12638 12638 0 00
िजरसथजन Rajasthan 10612 10612 0 00 11698 11698 0 00
उतति परिश Uttar Pradesh 18346 18121 225 12 20498 20062 436 21
उततिजखड Uttarakhand 1996 1996 0 00 2143 2143 0 00
उततरी कषतर Northern Region 56407 55649 758 13 63166 61726 1440 23
छततीसगढ़ Chhattisgarh 4404 4075 328 75 4404 4136 268 61
गरिजत Gujarat 16963 16963 0 00 17053 16963 90 05
मधय परिश Madhya Pradesh 8811 8771 41 05 8811 8775 36 04
महजिजषटर Maharashtra 22455 22349 106 05 23395 23254 141 06
िमन औि दिउ Daman amp Diu 357 356 1 02 357 356 1 02
िजिि व नगि हवली Dadra amp Nagar Haveli 816 815 1 01 816 815 1 01
गोवज Goa 596 596 0 00 596 596 0 00
पशचिमी कषतर Western Region 52933 52895 38 01 53841 52895 945 18
आनधर परिश Andhra Pradesh 9435 9416 19 02 9435 9416 19 02
तलगजनज Telangana 10815 10815 0 00 10815 10815 0 00
कनजाटक Karnataka 10103 10090 13 01 10690 10688 2 00
किल Kerala 3888 3638 251 64 4050 3997 53 13
तममल नजड Tamil Nadu 14556 14553 3 00 15029 14981 47 03
पडचिी Puducherry 390 372 17 45 420 400 19 46
लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0
दकषकषणी कषतर Southern Region 45542 45428 114 02 45946 45684 262 06
बबहजि Bihar 5050 5045 5 01 5050 5045 5 01
िजमोिि घजटी ननगम DVC 2641 2641 0 00 2874 2874 0 00
झजिखणड Jharkhand 1233 1233 0 00 1339 1284 55 41
ओडडशज Odisha 4906 4906 0 00 5357 5357 0 00
पशशचम बगजल West Bengal 8644 8639 5 01 9130 9123 7 01
मसशककम Sikkim 78 78 0 00 90 90 0 00
अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7
परवी कषतर Eastern Region 22110 22100 10 00 22470 22290 180 08
अरणजचल परिश Arunachal Pradesh 132 130 2 15 138 133 5 37
असम Assam 1865 1809 56 30 1865 1809 56 30
मणणपि Manipur 184 182 2 13 193 186 7 36
मघजलय Meghalaya 317 317 0 00 371 368 2 07
ममज़ोिम Mizoram 95 93 2 23 103 98 4 41
नजगजलड Nagaland 142 138 5 32 156 138 18 117
बिपिज Tripura 296 293 3 10 298 293 5 17
उततर-परवी कषतर North-Eastern Region 2921 2850 71 24 2967 2850 117 39
समपणण भारत All India 177022 175528 1494 08 177022 175528 1494 08
26
मजग की पनता म कमी मजग की पनता म कमी Demand not MetDemand not Met
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
Excludes the supply to Bangladesh
अधिकतम वरवदयत आपरतण शथिरत ररपोरण (सशोधित) Peak Power Supply Position Report (Revised)
आकड़ मगज वजट नट Figures in MW net
राजयStateससतबर2018 September2018 अपरल2018 -ससतबर2018 April2018 to September2018
File NoCEA-CH-14-1142018-Coordination Division
अकरबर2018 October2018अपरल2018 -अकरबर2018 April2018 to October2018
उततरी कषतर Northern Region
चडीगढ़ Chandigarh Data not received Data not received
दिलली Delhi
हरियजणज Haryana
दहमजचल परिश Himachal Pradesh
रमम कशमीि Jammu amp Kashmir Data not received Data not received
परजब Punjab
िजरसथजन Rajasthanउतति परिश Uttar Pradesh
उततिजखड Uttarakhand
पशचिमी कषतर Western Region
छततीसगढ़ Chhattisgarh
गरिजत Gujarat
मधय परिश Madhya Pradesh
महजिजषटर Maharashtra
गोवज Goa
दकषकषणी कषतर Southern Region
आनधर परिश Andhra Pradesh
तलगजनज Telangana
कनजाटक Karnataka
किल Kerala
तममल नजड Tamil Nadu
पडचिी Puducherryपरवी कषतर Eastern Region
बबहजि Bihar
झजिखणड Jharkhand
ओडडशज Odisha
पशशचम बगजल West Bengal
N
o No
tified
Cuts
N
o No
tified
Cuts
27
अकरबर 2018 म इडथरीर पर वरवदयत करौती का वरवरवरण Notified Power CutsRestrictions on Industries during October2018
राजय कषतर State Regionऊराणमाग करौती EnergyDemand Cut
No Notified Cuts No Notified Cuts
File NoCEA-CH-14-1142018-Coordination Division
अकरबर2018 October2018अपरल2018 -अकरबर2018 April2018 to October2018
उततरी कषतर Northern Region
चडीगढ़ Chandigarh Data not received Data not received
दिलली Delhi Data not received Data not received
हरियजणज Haryana 940 hrsday 0709 - 0950 hrsday
दहमजचल परिश Himachal Pradesh No cut imposed on agriculture consumers and uninterrupted
power is being supplied to agriculture sector
HPSEBL has only 2 agriculture consumers and uninterrupted
power is being supplied to agriculture sector
रमम कशमीि Jammu amp Kashmir Data not received Data not received
परजब Punjab 0507 hrsday 0349 - 0844 hrsday
िजरसथजन Rajasthan 0630 hrsday 0630 hrsday
उतति परिश Uttar Pradesh 1825 hrsday 1814 - 1858 hrsday
उततिजखड Uttarakhand 2350 hrsday 2128 - 2357 hrsday
पशचिमी कषतर Western Region
छततीसगढ़ Chhattisgarh 18hoursday 18 hrsday
गरिजत Gujarat 805 hrsday 805 hrsday
मधय परिश Madhya Pradesh Three-Phase Supply(Irrigation)-947 hrs day
Three-Phase (Mixed) Supply - 2311 hrs day
Three-Phase Supply(Irrigation)- 0933 - 0947 hrs day Three-
Phase (Mixed) Supply - 2300 - 2320 hrs day
महजिजषटर Maharashtra Three-Phase Supply(Irrigation)- 9 hrs day
Three-Phase (Mixed) Supply - 24 hrs day
Three-Phase Supply(Irrigation)- 9 hrs day
Three-Phase (Mixed) Supply - 24 hrs day
गोवज Goa No restriction No restriction
दकषकषणी कषतर Southern Region
आनधर परिश Andhra Pradesh 07 hrsday 07 hrsday
तलगजनज Telangana 24 hoursday 24 hoursday
कनजाटक Karnataka 6 hrsday 6 hrsday
किल Kerala No Restrictions No Restrictions
तममल नजड Tamil Nadu 9 hrsday (6 hrs during day time and 3 hrs during night time) 9 hrsday (6 hrs during day time and 3 hrs during night time)
पडचिी Puducherry No Restrictions No Restrictions
परवी कषतर Eastern Region
बबहजि Bihar About 18 hrsday About 18 hrsday
झजिखणड Jharkhand About 20 hrsday About 20 hrsday
ओडडशज Odisha 24 hrsday 24 hrsday
पशशचम बगजल West Bengal About 23 hrsday About 23 hrsday
28
अकटबर 2018 कषि कषतर को षिदयत आपरति का षििरण Power Supply to Agricultural Sector during October2018
राजय कषतर State Regionऔसत वरवदयत आपरतण घनरो म Average Hours of Supply
On segregated feeders
File NoCEA-CH-14-1142018-Coordination Division
SNo Contents Page
1 Growth of Installed Capacity since 6th Plan 29
2 Progress of Transmission Sector since 6th Plan 30
3 All India Yearly Coal consumption for Power Generation (Utilities)
4 All India Annual Per Capita Consumption of Electricity since -2006
5 Average cost of power supply amp Average realisation (Paisakwh)
6 Growth of Rural Electrification amp Pump Sets Energisation
7 Status of Hydro Schemes Cleared by the CEA in Oct-2018
Section G - Growth of Power Sector
31
32
File NoCEA-CH-14-1142018-Coordination Division
(In MW)
Coal Gas Diesel Total
End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472
End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634
End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537
End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596
End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921
End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703
End of 12th Plan 19216288 2532938 83763 21832988 6780 4447842 50018 31960630
Up to Oct-2018 19599250 2493722 837629 22176734 6780 4548742 7201281 34604757
Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-17) = 51529 MW
Electricity Generation (MU) Targets and Achievements for 2016-17
Coal Gas Diesel Nuclear Hydro Res Total
1959925 2493722 837629 678000 454874 72012805 22925174
29
1 Growth of Installed Capacity Since 6th Plan
Plan YearThermal
Nuclear Hydro RES (MNRE) Total
Total Installed Capacity 34604757 MW
Coal Gas Diesel Nuclear Hydro Res
File NoCEA-CH-14-1142018-Coordination Division
Progress of Transmission Sector in the Country up to Oct 2018
1 TRANSMISSION LINES (All fig in CKM)
At the end of
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
6th plan 0 0 0 0 0 0 0 0 0 0 0 0 1831 4198 0 6029 1641 44364 0 46005 3472 48562 0 52034
7th plan 0 0 0 0 0 0 0 0 0 0 0 0 13068 6756 0 19824 4560 55071 0 59631 17628 61827 0 79455
8th plan 0 0 0 0 1634 0 0 1634 0 0 0 0 23001 13141 0 36142 6564 73036 0 79600 31199 86177 0 117376
9th plan 0 0 0 0 3234 1504 0 4738 751 409 0 1160 29345 20033 0 49378 8687 88306 0 96993 42017 110252 0 152269
10th plan 0 0 0 0 4368 1504 0 5872 1775 409 0 2184 48708 24730 0 73438 9444 105185 0 114629 64295 131828 0 196123
11th Plan 0 0 0 0 5948 1504 1980 9432 4839 411 0 5250 71023 30191 5605 106819 10140 125010 830 135980 91950 157116 8415 257481
12th Plan 6124 0 0 6124 5948 1504 1980 9432 25465 1177 4598 31240 92482 48240 17065 157787 11014 151276 978 163268 141033 202197 24621 367851
13th Plan (Up
to Mar2018)6124 0 0 6124 5948 1504 1980 9432 28666 1512 4881 35059 98247 54286 19067 171600 11258 156497 1000 168755 150243 213799 26928 390970
13th Plan (Up
to Sep-18)6124 0 0 6124 5948 1504 1980 9432 30952 1512 5059 37523 99683 56069 20662 176414 11318 160958 1000 173276 154025 220043 28701 402769
27150
75050
47900
118050
90650
30
IR addition in 12th Plan (up to
March 2017)
Total IR (up to Oct-18)
IR at the end of 11th Plan
IR at the end of 12th Plan
Envisaged IR Capacity at the end
of 13th Plan
Grand Total
Note - The figure upto the end of 10th plan in for stringing progress including the lines not commissioned Now only commissioned lines are reckoned Accordingly the figure for 10th plan (end) may read as 187555 after adjusting with (-) 10852 Ckm
Inter-regional Power Transfer Capacity
plusmn 800 kV HVDC plusmn 500 kV HVDC 765 kV 400 kV 220 kV
File NoCEA-CH-14-1142018-Coordination Division
2004-05 27800
2005-06 28100
2006-07 30200
2007-08 33000
2008-09 35500
2009-10 36700
2010-11 38700
2011-12 41756
2012-13 45460
2013-14 48940
2014-15 53040
2015-16 54590
2016-17 57430
2017-18 60800
Year
2005-06
2006-07
2007-08
2008-09
2009-10
2010-11
2011-12
2012-13
2013-14
2014-15
2015-16
2016-17
2017-18
2004-05 254 209 7568
2005-06 260 221 7636
2006-07 276 227 7423
2007-08 293 239 7727
2008-09 340 263 8713
2009-10 355 268 8870
2010-11 398 303 11975
2011-12 455 330 13514
2012-13 501 376 14867
2013-14 518 175
2014-15 520
6719
7171
3 All India yearly Coal Consumption for Power Generation (Utilities)
YEARCoal Consumption
Million Tonnes
4 All India Annual per Capita consumption of Electricity Since 2006
Per Capita Consumption ( kWh)
6314
(GrossGen+ Net Import) Mid-year population
5 Average cost of power supply amp average realization ( paiseKWH )
Yearcost of supply
(paiseunit)
Realization(paiseunit)
Including AgricultureOnly
Agriculture
1149
7335
7786
91441
8188
88363
957
1010
1075
1122
File NoCEA-CH-14-1142018-Coordination Division
Source- PFC Reports on the performance of State Power Utilities 31
File NoCEA-CH-14-1142018-Coordination Division
Sl
NoExecuting Agency
Installed
Capacity (MW)Cost (Rs crore)
Date of
Clearance
32
No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification
since 2004-05
65291374575 296361511th Plan
Cumu upto End of 11th Plan
596556 21212860
557439Cummulative up to end of 12th Plan
46708
18423975
499150
2003-042004-05
5743
9769
Cumu upto End of 10th Plan
010407 to 310308
010410 to 310311557976840909
010411 to 310312
412667
86293726
3207
482864
12632
1576036
4451722594
15455554
2314176
397343611750
2093311060316074
65109527813884
6 Growth Of Rural Electrification amp Pumpsets Energisation
Plan Year
9th Plan2002-03
134092626
4111
Pump Sets Energised Villages Electricfied (Nos)
2001-02
284064367244
1218
27801997-981998-991999-002000-01
297594
010408 to 310309010409 to 310310
10th Plan
2005-062006-07
322968331020
Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as
Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received
from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made
available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified
villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is
independent of the earlier published reports
No Hydro Electric Project has been issued concurrenceAppraisal letter by CEA during October 2018
7 Status of Hydro Schemes Cleared by the CEA in Oct-2018
Name of Scheme
File NoCEA-CH-14-1142018-Coordination Division
SN Contents Page
1 Rate of sale of power for the year 2016-17 33-41
RATE OF SALE OF POWER FOR THE YEAR 2016-17
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) NORTHERN REGION
CENTRAL SECTOR
BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 18000 66900 19800
CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 54000 222400 21600
CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 30000 144400 19600
CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 23100 91700 42600
PARBATI - III HPS NHPC LTD HYDRO-HYDRO 52000 68200 54800
DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 28000 95600 30000
CHUTAK NHPC LTD HYDRO-HYDRO 4400 22000 79800
DULHASTI HPS NHPC LTD HYDRO-HYDRO 39000 228000 56400
SALAL HPS NHPC LTD HYDRO-HYDRO 69000 342300 11000
TANAKPUR HPS NHPC LTD HYDRO-HYDRO 9420 43000 29600
URI HPS -I NHPC LTD HYDRO-HYDRO 48000 280300 16000
URI HPS - II NHPC LTD HYDRO-HYDRO 24000 147300 48600
NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 4500 24600 88200
SEWA - II NHPC LTD HYDRO-HYDRO 12000 47100 43400
ANTA CCPP NTPC LTD THERMAL-GASN 41930 67539 32400
AURAIYA CCPP NTPC LTD THERMAL-GASN 66336 53501 39100
BADARPUR TPS NTPC LTD THERMAL-COAL 70500 159153 44800
DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 84000 296170 42300
DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 98000 526686 46300
DADRI CCPP NTPC LTD THERMAL-GASHSD 82978 227469 33000
FARIDABAD CCPP NTPC LTD THERMAL-GASN 43159 115577 30800
RIHAND STPS I NTPC LTD THERMAL-COAL 100000 596766 24500
RIHAND STPS II NTPC LTD THERMAL-COAL 100000 737069 24600
RIHAND STPS III NTPC LTD THERMAL-COAL 100000 706546 30600
SINGRAULI STPS NTPC LTD THERMAL-COAL 200000 1394068 20400
TANDA TPS NTPC LTD THERMAL-COAL 44000 295438 40800
UNCHAHAR TPS I NTPC LTD THERMAL-COAL 42000 256454 39800
UNCHAHAR TPS II NTPC LTD THERMAL-COAL 42000 273577 38900
UNCHAHAR TPS III NTPC LTD THERMAL-COAL 21000 142780 43000
KOLDAM NTPC LTD HYDRO-HYDRO 80000 363260 43600
NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 303575 25841
RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 108000 668677 35374
NJHPS SJVNL HYDRO-HYDRO 150000 699496 23820
RAMPUR HPS SJVNL HYDRO-HYDRO 41202 195982 32260
TEHRI HPP THDC HYDRO-HYDRO 100000 272543 51800
KOTESHWAR HEP THDC HYDRO-HYDRO 40000 106244 53400
IGSTPS JHAJJAR ARAVALI P CPL THERMAL-COAL 150000 510429 49490
NEYVELI BARSINGSAR NEYVELI LIG CORP LTD THERMAL-LIG 25000 127520 38040
STATE SECTOR
PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 21000 14222 48200
PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 21000 19205 48400
PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 25000 102257 42600
PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 25000 62107 41800
DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 60000 312213 41000
RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 120000 35767442200
WYC HYDEL STATION HPGCL HYDRO-HYDRO 6240 20365 24900
GIRI POWER HOUSE HPSEB HYDRO-HYDRO 6000 13958 7600
ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 1695 5467 11900
BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 12000 18528 6700
GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 2250 7462 22500
BASSI POWER HOUSE HPSEB HYDRO-HYDRO 6600 29649 7500
BINWA POWER HOUSE HPSEB HYDRO-HYDRO 600 2749 19300
ANNEXURE-I
RATE OF SALE OF POWER FOR THE YEAR 2016-2017
Page 33
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) GAJ POWER HOUSE HPSEB HYDRO-HYDRO 1050 2914 26700
BANER POWER HOUSE HPSEB HYDRO-HYDRO 1200 2864 16200
HOLI POWER HOUSE HPSEB HYDRO-HYDRO 300 616 22500
THIROT POWER HOUSE HPSEB HYDRO-HYDRO 450 1126 22500
KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 1200 3064 22500
LARJI POWER HOUSE HPSEB HYDRO-HYDRO 12600 53677 23700
NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 250 750 31000
CHABA POWER HOUSE HPSEB HYDRO-HYDRO 175 465 23300
RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 150 101 13400
SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 200 000 22500
KILLAR HPSEB HYDRO-HYDRO 030 050 22500
BHABA AUGUMENP H HPSEB HYDRO-HYDRO 450 1276 22500
BS CHAMBA HPSEB HYDRO-HYDRO 045 099 19500
GUMMA HPSEB HYDRO-HYDRO 300 423 22500
GAS TURBINE POWER STATION IPGCL THERMAL-GAS 27000 67233 39300
PPS-I PPCL THERMAL-GAS 33000 175905 38300
PPS-III PPCL THERMAL-GAS 137120 196879 36100
LOWER JHELUM JampKPDD HYDRO-HYDRO 10500 60214 5100
UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 2260 10514 6300
UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 10500 44202 8500
GANDHARBAL JampKPDD HYDRO-HYDRO 1500 8925 4700
KARNAH MPH JampKPDD HYDRO-HYDRO 200 1122 31000
CHENANI I JampKPDD HYDRO-HYDRO 2330 10892 6600
CHENANI II JampKPDD HYDRO-HYDRO 200 1188 9300
CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 750 3634 14200
IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 375 2108 18500
IGO MERCHELLONG JampKPDD HYDRO-HYDRO 300 1572 29700
PAHALGAM MHP JampKPDD HYDRO-HYDRO 450 1713 32900
MARPACHOO JampKPDD HYDRO-HYDRO 075 375 29800
HAFTAL JampKPDD HYDRO-HYDRO 100 483 28700
SANJAK JampKPDD HYDRO-HYDRO 126 441 36000
SEWA-III JampKPDD HYDRO-HYDRO 900 3273 20200
BHADERWAH JampKPDD HYDRO-HYDRO 150 935 8900
BAZGO JampKPDD HYDRO-HYDRO 030 108 33300
SUMOOR JampKPDD HYDRO-HYDRO 010 045 35400
HUNDER JampKPDD HYDRO-HYDRO 040 176 26200
STAKNA JampKPDD HYDRO-HYDRO 400 1933 4100
KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 124000 662879 31360
SURATGARH TPS RRVUNL THERMAL-COAL 150000 402328 41730
CHHABRA TPS 1amp 2 RRVUNL THERMAL-COAL 50000 305946 36700
CHHABRA TPS 3 RRVUNL THERMAL-COAL 25000 151536 36700
CHHABRA TPS 4 RRVUNL THERMAL-COAL 25000 155896 36700
RAMGARH GT POWER PROJECT RRVUNL THERMAL-COAL 22050 43177 41800
RAMGARH GAS T P PROJECT 3 RRVUNL THERMAL-GAS 5000 93615 41800
DHOLPUR C C POWER PROJECT RRVUNL THERMAL-R-LNG 33000 9486 46110
MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 14000 20855 34192
MINI MICRO HYDEL (MMH) P S RRVUNL HYDRO-HYDRO 2385 851 37800
KALISINDH TPP 1 RRVUNL THERMAL-COAL 60000 341543 45000
KALISINDH TPP 2 RRVUNL THERMAL-COAL 60000 211588 45000
KHARA HEP UPJVNL HYDRO-HYDRO 7200 26654 7200
MATATILLA HEP UPJVNL HYDRO-HYDRO 3060 12219 6500
OBRA HEP UPJVNL HYDRO-HYDRO 9900 21517 6300
RIHAND UPJVNL HYDRO-HYDRO 30000 57369 5500
ANPARA A TPS UPRVUNL THERMAL-COAL 63000 317536 27000
ANPARA B TPS UPRVUNL THERMAL-COAL 100000 705605 22700
ANPARA D UPRVUNL THERMAL-COAL 100000 300158 39800
HARDUAGANJ TPS UPRVUNL THERMAL-COAL 16500 45817 49200
HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 50000 304389 46600
OBRA A TPS UPRVUNL THERMAL-COAL 28800 13158 34000
OBRA B TPS UPRVUNL THERMAL-COAL 100000 328124 21900
Page 34
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) PANKI TPS UPRVUNL THERMAL-COAL 21000 66488 50300
PARICHHA TPS UPRVUNL THERMAL-COAL 22000 38762 49400
PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 42000 231931 45600
PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 50000 276722 50400
CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 24000 70845 8290
CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 14400 75366 8390
DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 3375 9595 12080
DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 5100 18701 10520
KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4140 17359 12330
KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 12000 33001 9420
KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 3000 11953 8320
TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 9000 33983 12460
MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 30400 124510 16110
RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 19800 17897 10550
MPUR UTTARAKHAND JVNL HYDRO-HYDRO 930 5121 19200
PATHRI UTTARAKHAND JVNL HYDRO-HYDRO 2040 11636 14200
GALOGI UTTARAKHAND JVNL HYDRO-HYDRO 300 648 12500
PRIVATE SECTOR
MGTPP CLP INDIA PVT LTD THERMAL-COAL 132000 268902 41940
SHRINAGAR HEP ALAKNANDA HPCL HYDRO-HYDRO 33000 127414 48800
GAMA INFRAPROP CCPP GAMA INFRAPROP PVT THERMAL-GAS 22500 52686 47000
PPGCL (BARA) JP POWER VENTURES LTD THERMAL-COAL 198000 448200 38500
MALANA HEP MALANA PCL HYDRO-HYDRO 8600 26354 29792
MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 10000 30369 32580
ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 19200 56347 36079
KASHANG HEP H P PCL HYDRO-HYDRO 19500 5034 29200
BASPA-II HEP HBPCL HYDRO-HYDRO 30000 132769 13600
KARCHAM WANGTOO HEP HBPCL HYDRO-HYDRO 100000 434386 36600
RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 108000 582600 43700
RITHALA COMBI CY POWER PLANT TATA POWER DDL THERMAL-GAS 9480 000 11900
RAJPURA TPS NABHA POWER LTD THERMAL-GAS 140000 901484 39000
TALWANDI SABO POWER LTD TALWANDI SABO POWER LTD THERMAL-COAL 198000 636040 49548
ROJA THERMAL POWER STATION ROJA POWER SCL THERMAL-COAL 120000 727200 43400
KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 34400 63400
BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 36000 62600
MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 38200 60800
UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 37900 61500
KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 42300 58800
LALITPUR PGCL BAJAJ ENERGY PVT LTD THERMAL-COAL 198000 359400 47300
PRAYAGRAJ PGCL PRAYAGRAJ PGCL THERMAL-COAL 132000 448200 38595
KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 132000 783182 33438
WESTERN REGION
CENTRAL SECTOR
INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 100000 325333 23892
OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 52000 141663 34001
GANDHAR CCPP NTPC LTD THERMAL-GAS 65739 221924 28700
KAWAS CCPP NTPC LTD THERMAL-GASN 65620 167929 27000
KORBA I amp II NTPC LTD THERMAL-COAL 210000 1499171 20500
KORBA III NTPC LTD THERMAL-COAL 50000 358746 26600
SIPAT STPS I NTPC LTD THERMAL-COAL 198000 1479902 26800
SIPAT STPS II NTPC LTD THERMAL-COAL 100000 766549 26500
VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 126000 693142 25800
VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 100000 608781 23800
VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 100000 673475 27600
VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 100000 655924 32900
VINDHYACHAL STPS V NTPC LTD THERMAL-COAL 50000 328265 31700
MOUDA I NTPC LTD THERMAL-COAL 100000 343130 44500
MOUDA Ii NTPC LTD THERMAL-COAL 66000 40637 39900
RATNAGIRI GAS amp POWER PVT LTD RGPPL THERMAL-GAS 196708 442485 47000
KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 000 24729
TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 32000 201227 10740
Page 35
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 365122 19069
TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 787444 29324
STATE SECTOR
GSEG-HAZIRA15610 MW GUJARAT S ENEGEN LTD THERMAL-GAS 15610 1805 28200
GSEG-HAZIRA35143 MW GUJARAT S ENEGEN LTD THERMAL-GAS 35130 22276 51300
GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 21978 51800
AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 13929 26100
KORBA TPS EAST CSPGCL THERMAL-COAL 44000 198673 33880
DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 365808 27570
KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 316500 30420
HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 532878 19410
CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 515 58300
MTTPS CHAMPA U-I CSPGCL THERMAL-COAL 50000 220376 39000
MTTPS CHAMPA U-II CSPGCL THERMAL-COAL 50000 23709 10000
SHP GANGREL CSPGCL HYDRO-HYDRO 1000 2350 36790
BANGO HEP CSPGCL HYDRO-HYDRO 12000 14662 8900
MHP KORBA WEST CSPGCL HYDRO-HYDRO 170 859 38190
SIKASAR HEP CSPGCL HYDRO-HYDRO 700 418 26870
DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8843 74500
DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 19446 51500
GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 66388 71600
GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127488 41300
KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 96072 43900
KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 29841 56400
SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 184966 58800
UKAI 1-5 GSECL THERMAL-COAL 85000 204891 46900
UKAI TPS 6 GSECL THERMAL-COAL 50000 284448 48200
WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 271999 58300
WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 82808 44100
KADANA HPS GSECL HYDRO-HYDRO 24200 34433 16800
UKAI HPS GSECL HYDRO-HYDRO 30500 40585 6100
TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 123000 11500
BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 8900 10900
BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 7200 27500
JHINNA HPS MPPGCL HYDRO-HYDRO 2000 9700 18500
RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 44300 3400
GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 17300 4600
SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 4100 16900
MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 14600 27000
PENCH HPS MPPGCL HYDRO-HYDRO 16000 23700 8100
RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 3000 16900
AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 134400 35100
SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 283800 38700
SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 344600 34300
SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 111600 61600
SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 211800 58000
SSTPS PH-I MPPGCL THERMAL-COAL 120000 233100 84300
BHUSAWAL TPS MSPGCL THERMAL-COAL 142000 566258 51100
CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1365682 33700
KHAPERKHEDA MSPGCL THERMAL-COAL 134000 706207 39100
KORADI TPS MSPGCL THERMAL-COAL 62000 443206 42000
NASIK TPS MSPGCL THERMAL-COAL 63000 297275 47000
PARLI TPS MSPGCL THERMAL-COAL 113000 175934 71600
PARAS MSPGCL THERMAL-COAL 50000 267931 38700
URAN CCPP MSPGCL THERMAL-GAS 67200 320330 30600
KOYANA MSPGCL HYDRO-HYDRO 195600 328155 13100
SMALL HYDRO POWER PLANTS MSPGCL HYDRO-HYDRO 45400 93062 30500
BHIRA MSPGCL HYDRO-HYDRO 8000 10046 8400
TILLARI MSPGCL HYDRO-HYDRO 8900 10584 3100
SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 233298 20500
SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 87633 20500
PRIVATE SECTOR
Page 36
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 81282 46750
JNSTPP(JAYPEE NIGRIE) JP POWER VENTURES LTD THERMAL-COAL 132000 726695 29310
MB POWER MB POWER THERMAL-COAL 120000 345632 38310
ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 754922 28671
ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 780761 23495
ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 198000 1263784 32090
ADANI POWER MAHARA ADANI POWER LTD THERMAL-COAL 330000 1666191 34124
AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 170065 36827
SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 252035 45129
ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 458551 36000
ESSAR POWER MP LTD ESSAR POWER MP LTD THERMAL-COAL 60000 243040 28600
VEDANTA LTD (P P -I) VEDANTA LTD THERMAL-GAS 3000 15044 24000
VEDANTA LTD (P P -II) VEDANTA LTD THERMAL-GAS 3000 21293 24000
PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 8234600 24000
165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 5850 64390
145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 68717 40349
SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 132655 28776
SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 144686 38567
MUNDRA UMPPCOASTAL GUJARAT POWER
LTD THERMAL-IMP COAL 400000 2530300
23900
LANCO AMARKANTAK TPP PATHADIH
U-ILANCO AMARKAN POWER LTD THERMAL-COAL 30000 195500
29200
LANCO AMARKANTAK TPP PATHADIH
U-IILANCO AMARKAN POWER LTD THERMAL-COAL 30000 206900
27600
BARADARHA TPS D B POWER LTD THERMAL-COAL 120000 677373 29200
JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 405000 28900
JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 453000 40500
DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 339437 40700
TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 293400 44000
TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 137200 37000
TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 174900 44000
BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 92900 14100
BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23700 34300
KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 27600 48300
CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2530300 23900
BHANDARDRA HEP -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 2475 54900
SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 161400 26500
SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 445000 39000
SOTHERN REGION
CENTRAL SECTOR
NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 325699 54820
NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 305532 39880
NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 998805 38510
NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 113016 54070
NEYVELI TAMILNADU POWER LTD JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 625274 42200
VALLUR TPS NTPC TECL THERMAL-COAL 150000 856438 42350
R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 1493 84300
RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1502919 29400
RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 341291 31800
SIMHADRI I NTPC LTD THERMAL-COAL 100000 688382 36800
SIMHADRI II NTPC LTD THERMAL-COAL 100000 663657 43400
KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 593110 31324
MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 291625 21764
KKNPP-1 amp 2 NPCIL NUCLEAR-NUCLEAR 200000 572609 40948
MINICOY LAKSHADEEP THERMAL-DIESEL 340 770 29600
KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1097 29600
AMINI LAKSHADEEP THERMAL-DIESEL 265 509 29600
ANDROTT LAKSHADEEP THERMAL-DIESEL 219 524 29600
KALPENI LAKSHADEEP THERMAL-DIESEL 175 356 29600
AGATTI LAKSHADEEP THERMAL-DIESEL 195 658 29600
KADMAT LAKSHADEEP THERMAL-DIESEL 190 414 29600
KILTAN LAKSHADEEP THERMAL-DIESEL 150 269 29600
CHETLET LAKSHADEEP THERMAL-DIESEL 100 139 29600
BITRA LAKSHADEEP THERMAL-DIESEL 043 024 29600
BANGARAM LAKSHADEEP THERMAL-DIESEL 018 009 29600
Page 37
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) STATE SECTOR
Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 721811 46500
Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 50000 336142 46500
RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 237358 46500
RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 239926 46500
RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 124500 46500
SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 62109 46500
UPPER SILERU APGENCO HYDRO-HYDRO 24000 33000 46500
LOWER SILERU APGENCO HYDRO-HYDRO 46000 81066 46500
DONKARAI APGENCO HYDRO-HYDRO 2500 6007 46500
PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 1262 46500
CHETTIPETA APGENCO HYDRO-HYDRO 100 214 46500
MUCHKUND APGENCO HYDRO-HYDRO 12000 37571 46500
NAGARJUNASAGAR RCPH APGENCO HYDRO-HYDRO 9000 606 46500
TUNGABHADRA HES amp HAMPI(AP
Share)
APGENCO HYDRO-HYDRO 7200 6100 46500
KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 352232 42600
KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 288131 32500
KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 319272 46500
RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 40073 44300
KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 308317 46000
KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 308963 51300
SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 61004 76600
NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 17960 75300
PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 20873 58300
POCHAMPAD-I TSPGENCO HYDRO-HYDRO 2700 5455 29800
POCHAMPAD-II TSPGENCO HYDRO-HYDRO 900 1932 40700
NIZAMSAGAR TSPGENCO HYDRO-HYDRO 1000 1126 53400
RAICHUR TPS 1 to 7 KPCL THERMAL-COAL 147000 890866 43800
RAICHUR TPS 8 KPCL THERMAL-COAL 25000 159523 48200
BELLARI TPS 1 KPCL THERMAL-COAL 50000 318679 51100
BELLARI TPS 2 KPCL THERMAL-COAL 50000 232347 55600
BELLARI TPS 3 KPCL THERMAL-COAL 70000 47565 34400
BHADRA PH KPCL HYDRO-HYDRO 3920 2369 45900
GERUSUPPA PH KPCL HYDRO-HYDRO 24000 26990 22000
GHAT PRABHA HEP KPCL HYDRO-HYDRO 3200 4777 25300
KADRA HPS KPCL HYDRO-HYDRO 15000 16889 26800
NAGJHARI KPCL HYDRO-HYDRO 90000 155159 9800
KODASALLI DPH KPCL HYDRO-HYDRO 12000 14854 19200
MUNIRA+MGH+SPH+SPH KPCL HYDRO-HYDRO 22640 48211 7900
SHARAVATHY HPS KPCL HYDRO-HYDRO 108550 276215 5400
ALMATTI DPH KPCL HYDRO-HYDRO 29000 39611 24600
VARAHI UGPH KPCL HYDRO-HYDRO 46000 71368 15600
IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 17196 15300
IDUKKI HPS KSEB HYDRO-HYDRO 78000 137905 15300
KAKKAD HPS KSEB HYDRO-HYDRO 5000 13063 15300
KALLADA HPS KSEB HYDRO-HYDRO 1500 4436 15300
KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 46544 15300
KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 635 15300
LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 30822 15300
MALANKARA HPS KSEB HYDRO-HYDRO 1050 2474 15300
MATTUPETTY KSEB HYDRO-HYDRO 200 230 15300
MALAMPUZHA KSEB HYDRO-HYDRO 250 063 15300
CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 864 15300
URUMI ST I amp II KSEB HYDRO-HYDRO 615 903 15300
LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 248 15300
NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7765 19625 15300
PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 16601 15300
PANNIAR HPS KSEB HYDRO-HYDRO 3240 6217 15300
PORINGALKUTHU KSEB HYDRO-HYDRO 3600 10052 15300
PORINGALKUTHU LBE KSEB HYDRO-HYDRO 1600 9438 15300
PEPPARA KSEB HYDRO-HYDRO 300 395 15300
POOZHITHODE KSEB HYDRO-HYDRO 480 1045 15300
Page 38
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) PEECHI KSEB HYDRO-HYDRO 125 040 15300
RANI-PERUNADU KSEB HYDRO-HYDRO 400 585 15300
SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 79783 15300
SENGULAM HPS KSEB HYDRO-HYDRO 5120 11558 15300
SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 16711 15300
VILANGAD KSEB HYDRO-HYDRO 750 1578 15300
BARAPOLE KSEB HYDRO-HYDRO 1500 1932 15300
VELLATHOOVAL KSEB HYDRO-HYDRO 360 305 15300
CHIM0NY KSEB HYDRO-HYDRO 250 156 15300
ADYANPARA KSEB HYDRO-HYDRO 350 501 15300
BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 554 15300
KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 3801 15300
KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 23132 32800
ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 14416 62280
METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 523970 62280
METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 321270 62280
NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 336575 62280
NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 591240 62280
TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 508966 62280
KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 30897 62280
VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 18720 90699 62280
KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 33593 62280
BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 1047 62280
PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 1250 62280
PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 330 62280
MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 4897 62280
MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 032 62280
KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15681 62280
KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 40608 62280
KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 21342 62280
KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 4717 62280
KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4322 62280
KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2399 62280
METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 4416 62280
METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 8035 62280
BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2187 62280
BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2359 62280
BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2511 62280
BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 1949 62280
BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 1819 62280
POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 172 62280
SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 241 62280
MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 026 62280
THIRUMOORTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 136 62280
PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 9309 62280
VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 353 62280
SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 4192 62280
PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 6571 62280
SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 1186 62280
SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6319 62280
ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 6122 62280
KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 28674 62280
SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 18381 62280
SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 4258 62280
KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 12680 62280
KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4201 62280
ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 000 62280
PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 19175 62280
AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 078 62280
BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 504 62280
BHAVANI KATTALAI (BKB)(IIIampIII BB I amp II)TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 5847 62280
PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 000 62280
Page 39
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) SRI DAMODARAM STPS APPDCL THERMAL-COAL 160000 808108 36300
PRIVATE SECTOR
KARUPPUR TANJORE LANCO TANJORE PCL THERMAL-GAS 12000 48096 28770
SIMHAPURI ENERGY LTD SIMHAPURI ENERGY LTD THERMAL-COAL 60000 143900 39100
JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 7111 45500
SBU 1 JSW ENERGY LTD
VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 26000 159100
43300
SBU 2 JSW ENERGY LTD
VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 60000 247900
42800
LANCO KPLLANCO KONDAPALLI POWER
LTDTHERMAL-GAS 36814 85060
25776
LANCO KPL STG -IILANCO KONDAPALLI POWER
LTDTHERMAL-GAS 36600 12979
46330
LANCO KPL STG -IIIALANCO KONDAPALLI POWER
LTDTHERMAL-GAS 37100 85710
46330
LANCO KPL STG -III BLANCO KONDAPALLI POWER
LTDTHERMAL-GAS 37100 43639
46330
HINDUJA NATIONAL PCL HINDUJA NATIONAL PCL THERMAL-COAL 104000 303000 38200
MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 121164 49940
UDUPI POWER COR LTD ADANI POWER LTD THERMAL-COAL 120000 754613 42500
SPECTRUM POWER GENERATION
LTD SPECTRUM PG LTD THERMAL-GASN 20525 9256812
34952
TAQA NEYVELI POWER COM PVT
LTD TAQA NEYVELI THERMAL-LIG 25000 5840
34500
ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 251000 51000
ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 207860 36800
GMR VEMAGIRI POWER GENERATION
LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 30117
46450
EASTERN REGION
CENTRAL SECTOR
MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 64675 53113
MTPS STAGE - II KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 39000 1432 69138
BOKARO `B` TPS DVC THERMAL-COAL 63000 145670 31539
MEJIA TPS U 1-3 DVC THERMAL-COAL 63000 348298 31552
MEJIA TPS U 4 DVC THERMAL-COAL 21000 116099 34997
MEJIA TPS U 5-6 DVC THERMAL-COAL 50000 276427 35976
MEJIA TPS U 7-8 DVC THERMAL-COAL 100000 552854 36991
DURGAPUR STEEL TPS DVC THERMAL-COAL 100000 665550 39323
DURGAPUR TPS DVC THERMAL-COAL 21000 59270 35416
RAGHUNATHPUR TPS DVC THERMAL-COAL 120000 201650 35326
MAITHON HYDEL STA DVC HYDRO-HYDRO 6320 12200 17984
CHANDRAPURA TPSU1-3 DVC THERMAL-COAL 42000 257610 35095
CHANDRAPURA TPSU7-8 DVC THERMAL-COAL 50000 306673 34987
KODERMA TPS DVC THERMAL-COAL 100000 380180 38131
PANCHET HPS DVC HYDRO-HYDRO 8000 13360 17984
TILLAYA HPS DVC HYDRO-HYDRO 400 1410 17984
RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34700 35400
TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 277300 23200
TLDP -III NHPC LTD HYDRO-HYDRO 13200 55400 62000
TLDP -IV NHPC LTD HYDRO-HYDRO 16000 60300 25600
FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 957219 33700
FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 308943 41000
BONGAINGAON TPS NTPC LTD THERMAL-COAL 25000 153663 58600
KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 542277 34200
KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 942591 34200
BARH-II NTPC LTD THERMAL-COAL 132000 728021 44500
TALCHER TPS NTPC LTD THERMAL-COAL 46000 335521 30100
TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 702319 25600
TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1436521 24700
STATE SECTOR
BTPS(RampM) BIHAR STATE PGCL THERMAL-COAL 22000 12142 39700
BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 98331 10602
HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 50593 9482
CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 19689 2605
RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 53192 6033
UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 147208 14637
Page 40
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 60353 4519
IB TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 288567 25000
J P H GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 210 038 61100
MEYONG CHU GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 400 1086 61100
TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 122667 38200
DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 214339 43321
KOLAGHAT THERMAL POWER
STATION
WEST BENGAL PDCL THERMAL-COAL 126000 538269 31603
BAKRESHWAR THERMAL POWER
PLANT
WEST BENGAL PDCL THERMAL-COAL 105000 634876 32154
BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 45000 166855 33299
SANTHALDIH THERMAL POWER
STATION
WEST BENGAL PDCL THERMAL-COAL 50000 336442 34932
SAGARDIGHI THERMAL POWER
PROJECT
WEST BENGAL PDCL THERMAL-COAL 160000 423121 34705
JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 20344 68900
RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 24559 68900
TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 4623 68900
PURULIA PUMPED STORAGE
PROJECT
WEST BENGAL SEDCL HYDRO-HYDRO 90000 108816 68900
MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2768 68900
PRIVATE SECTOR
CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 49474 20230
CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 555500 70200
HALDIA ENERGY HALDIA ENERGY LTD THERMAL-COAL 60000 371000 50400
DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3688 63400
KAMALANGA TPS GMR KAMALANGA ENERGY LTD THERMAL-COAL 105000547670
33300
ADHUNIK POWER U-1 ADHUNIK POWER THERMAL-COAL 27000 158 44060
ADHUNIK POWER U-2 ADHUNIK POWER THERMAL-COAL 27000 168 44250
VL-JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 332800 23622
JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 43000 45250
JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 71700 37030
JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 70700 35920
JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 71100 38870
JOJOBERA UNIT 5 TATA POWER COM LTD THERMAL-COAL 12000 79300 44560
JOJOBERA UNIT 6 TATA POWER COM LTD THERMAL-WHR 12000 83700 12840
IEL KALINGANAGAR U-I TATA POWER COM LTD THERMAL-WG 6750 33400 22500
IEL KALINGANAGAR U-II TATA POWER COM LTD THERMAL-WG 6750 34800 22500
MAITHON UNIT 1 amp 2 TATA POWER COM LTD THERMAL-COAL 105000 678000 36100
HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 27500 24340
HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 28400 24340
HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 15800 24310
NORTH EASTERN REGION
CENTRAL SECTOR
LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 74100 36600
AGARTALA GT NEEPCO THERMAL-GAS 13500 88611 27210
ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 153111 32310
DOYANG HEP NEEPCO HYDRO-HYDRO 7500 25598 49801
KOPILI HEP NEEPCO HYDRO-HYDRO 20000 98186 11491
KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 19582 20237
KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 10310 17968
RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 124093 22945
TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 10100 17344 39000
STATE SECTOR
HYDRO POWER (122 Stns) ITANAGAR GOVT OF ARUNACHAL
PRADESHHYDRO-HYDRO 6971 6217270
24600
KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39514 17337
LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 82327 36810
NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 33318 48290
MYNTRIANG SHEP ST II ASSAM POWER GENCO HYDRO-HYDRO 300 567 35776
LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 9130 49200
LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 012 49200
DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 022 49200
TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 000 49200
UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 4990 16000
UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 6476 37000
UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 16494 14600
UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 3600 9556 15000
SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 758 8000
MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44070 44800
KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 154 41400
TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 091 41400
MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 411 41400
MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 394 41400
KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 760 41400
SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 3264 41400
LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 044 41400
BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 18953 28000
ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 43585 28200
GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 4080 11100
Note
LIG Lignite N Naptha WHR Waste Heat Recovery
Page 41
File NoCEA-CH-14-1142018-Coordination Division
(MW)
Cummulative
Deviation
Target Achievement Target Achievement (+) (-)
Central 2760 250 0 250 0 -250
State 450615 1030 0 1030 69755 -960245
Private 0 0 600 0 600 600
Total 726615 1280 600 1280 669755 -610245
Central 710 0 0 110 110 0
State 130 0 0 12999 30 -9999
Private 0 0 0 0 0 0
Total 840 0 0 23999 140 -9999
Nuclear Central 0 0 0 0 0 0
Central 3470 250 0 360 110 -250
State 463615 1030 0 115999 99755 -1060235
Private 0 0 600 0 600 600
Total 810615 1280 600 151999 809755 -710235
Electricity Generation (MU) Targets and Achievements for 2016-17
13
2 Capacity Addition Targets Achievements During Oct-2018
Schemes Sector
Target 2018-19
April 2018- Oct 2018Oct-18
Hydro
All India
Capacity Addition TargetsAchievements during the Month of Oct-2018
Thermal
12
80
24
0
0
15
20
67
0
14
0
0
81
0
0
200
400
600
800
1000
1200
1400
1600
Thermal Hydro Nuclear Total
MW
Targets and Achievement during 2018-19Target Achievement
600
0 00 0
600
0
100
200
300
400
500
600
700
800
900
1000
Target Achievement
MW
Targets and Achievement during Oct 2018Thermal Hydro
Nuclear Total
File NoCEA-CH-14-1142018-Coordination Division
Coal Gas Diesel Total
State 1593400 287920 000 1881320 000 869755 68956 2820031
Private 2276083 55800 000 2331883 000 251400 1261535 3844818
Central 1258537 234406 000 1492943 162000 849622 32900 2537465
Sub Total 5128020 578126 000 5706146 162000 1970777 1363391 9202314
State 2128000 284982 000 2412982 000 544650 31119 2988751
Private 3488567 467600 000 3956167 000 48100 2005170 6009437
Central 1504295 328067 000 1832362 184000 162000 66130 2244492
Sub Total 7120862 1080649 000 8201511 184000 754750 2102418 11242679
State 1943250 79198 28788 2051236 000 1183803 52102 3287141
Private 1212450 532210 47370 1792030 000 000 3495815 5287845
Central 1422502 35958 000 1458460 332000 000 49190 1839650
Sub Total 4578202 647366 76158 5301726 332000 1183803 3597107 10414636
State 695000 10000 000 705000 000 353792 22511 1081303
Private 637500 000 000 637500 000 39900 84853 762253
Central 1387664 000 000 1387664 000 100520 1000 1489184
Sub Total 2720164 10000 000 2730164 000 494212 108364 3332740
State 000 49771 3600 53371 000 42200 25674 121245
Private 000 2450 000 2450 000 000 2571 5021
Central 52002 125360 000 177362 000 103000 500 280862
Sub Total 52002 177581 3600 233183 000 145200 28745 407128
State 000 000 4005 4005 000 000 525 4530
Private 000 000 000 000 000 000 221 221
Central 000 000 000 000 000 000 510 510
Sub Total 000 000 4005 4005 000 000 1256 5261
State 6359650 711871 36393 7107913 000 2994200 200887 10303000
Private 7614600 1058060 47370 8720030 000 339400 6850164 15909594
Central 5625000 723791 000 6348791 678000 1215142 150230 8392163
Total 19599250 2493722 83763 22176734 678000 4548742 7201281 34604757
Figures at decimal may not tally due to rounding off
Note -
(As per latest information available with MNRE)
Break up of RES all India as on 30092018 is given below (in MW)
450695 3461510 2402166 7201281
A Oct 2018 669755 MW
B Capacity Retired
during
Oct 2018 705 MW
C Oct 2018 0 MW
D Oct 2018 A-B+C -35245 MW
Share of Telangana from JEGURUPADU CCPP Ph II has been removed and the same has been added to private sector of Andhra Pradesh due to expiry of PPA as per
request from TS Transco
Region
ALL INDIA INSTALLED CAPACITY (IN MW) OF POWER STATIONS (As on 31102018)
(UTILITIES)
Net Capacity Added during
1 RES include SHP BP UampI Solar and Wind Energy Installed capacity in respect of RES (MNRE) as on 30092018
Small
Hydro PowerWind Power
Bio-PowerSolar Power
Total
CapacityBM PowerCogen Waste to Energy
2 U-1 to 7 (76995=69755 MW) of LAKWA REPLACEMENT POWER PROJECT commissioned in April 2018 but intimated in October 2018
has been added to state sector of Assam
1 Badarpur TPS (705 MW) has been retired from central sector of Northern Region
Capacity Up-rated
Ownership Sector
873080 13830
Capacity Added during
1 U-2 (600 MW) of MAHAN TPP has been commissioned and added to private sector of Madhya Pradesh
Grand TotalThermalNuclear Hydro
Islands
ALL INDIA
Abbreviation- SHP=Small Hydro Project (le 25 MW) BP=Biomass Power UampI=Urban amp Industrial Waste Power RES=Renewable Energy Sources
Northern Region
Western Region
Southern Region
Eastern Region
North Eastern
Region
RES
(MNRE)
Modewise breakup
File NoCEA-CH-14-1142018-Coordination Division
Coal Gas Diesel Total
State 13500 180040 000 193540 000 000 000 193540
Private 86922 10800 000 97722 000 000 12157 109879
Central 311272 20701 000 331973 10283 72309 000 414565
Sub-Total 411694 211541 000 623235 10283 72309 12157 717984
State 272000 15000 000 287000 000 110282 5930 403212
Private 408078 000 000 408078 000 20000 34745 462823
Central 129472 53561 000 183034 10094 66370181 500 259998
Sub-Total 809550 68561 000 878112 10094 196652 41175 1126032
State 000 000 000 000 000 69460 25661 95121
Private 000 000 000 000 000 99200 60536 159736
Central 18340 6201 000 24541 2895 122388 000 149824
Sub-Total 18340 6201 000 24541 2895 291048 86197 404681
State 000 17500 000 17500 000 123000 12903 153403
Private 000 000 000 000 000 000 5985 5985
Central 50639 12907 000 63547 6798 109188 000 179533
Sub-Total 50639 30407 000 81047 6798 232188 18888 338921
State 176000 15000 000 191000 000 259770 12780 463550
Private 511550 000 000 511550 000 28800 115462 655812
Central 85458 26401 000 111859 19681 92342 000 223882
Sub-Total 773008 41401 000 814409 19681 380912 128242 1343244
State 585000 60380 000 645380 000 109618 2385 757383
Private 388200 000 000 388200 000 10400 710680 1109280
Central 120625 22110 000 142735 55674 73901 29400 301710
Sub-Total 1093825 82490 000 1176315 55674 193919 742465 2168373
State 546900 000 000 546900 000 72410 2510 621820
Private 871433 000 000 871433 000 84200 266691 1222324
Central 379639 54949 000 434588 28948 180253 3000 646789
Sub-Total 1797972 54949 000 1852921 28948 336863 272201 2490933
State 000 000 000 000 000 125215 6787 132002
Private 9900 45000 000 54900 000 8800 52244 115944
Central 34324 6966 000 41290 3124 47554 000 91968
Sub-Total 44224 51966 000 96190 3124 181569 59031 339914
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 3035 3035
Central 3815 1503 000 5317 801 10171 000 16289
Sub-Total 3815 1503 000 5317 801 10171 3035 19324
124953 29105 000 154058 23703 75145 000 252907
State 1593400 287920 000 1881320 000 869755 68956 2820031
Private 2276083 55800 000 2331883 000 251400 1261535 3844818
Central 1258537 234406 000 1492943 162000 849622 32900 2537465
Grand Total 5128020 578126 000 5706146 162000 1970777 1363391 9202314
Uttar Pradesh
Uttarakhand
Chandigarh
Grand TotalThermalNuclear
Hydro
(Renewable)
RES
(MNRE)
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
NORTHERN REGION
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
(As on 31102018)
Central - Unallocated
Total (Northern
Region)
Delhi
Haryana
Himachal Pradesh
Jammu amp Kashmir
Punjab
Rajasthan
State Ownership Sector
Modewise breakup
File NoCEA-CH-14-1142018-Coordination Division
(As on 31102018)
Coal Gas Diesel Total
State 000 000 000 000 000 000 005 005
Private 000 4800 000 4800 000 000 091 4891
Central 45478 1967 000 47445 2600 000 000 50045
Sub-Total 45478 6767 000 52245 2600 000 096 54941
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 1301 1301
Central 12663 4334 000 16997 700 000 000 17697
Sub-Total 12663 4334 000 16997 700 000 1301 18998
State 475000 217782 000 692782 000 77200 800 770782
Private 776567 396000 000 1172567 000 000 729782 1902349
Central 309051 42400 000 351451 55900 000 23830 431181
Sub-Total 1560618 656182 000 2216800 55900 77200 754412 3104312
State 408000 000 000 408000 000 170366 8396 586762
Private 617400 10000 000 627400 000 000 378205 1005605
Central 279441 25700 000 305141 27300 152000 30000 514441
Sub-Total 1304841 35700 000 1340541 27300 322366 416601 2106808
State 228000 000 000 228000 000 12000 1105 241105
Private 849000 000 000 849000 000 000 52430 901430
Central 195344 000 000 195344 4800 10000 000 210144
Sub-Total 1272344 000 000 1272344 4800 22000 53535 1352679
State 1017000 67200 000 1084200 000 285084 20813 1390097
Private 1245600 56800 000 1302400 000 48100 842815 2193315
Central 433475 227273 000 660748 69000 000 12300 742048
Sub-Total 2696075 351273 000 3047348 69000 333184 875927 4325459
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 546 546
Central 17444 6634 000 24078 900 000 000 24978
Sub-Total 17444 6634 000 24078 900 000 546 25524
211400 19759 000 231159 22800 000 000 253959
State 2128000 284982 000 2412982 000 544650 31119 2988751
Private 3488567 467600 000 3956167 000 48100 2005170 6009437
Central 1504295 328067 000 1832362 184000 162000 66130 2244492
Grand Total 7120862 1080649 000 8201511 184000 754750 2102418 11242679
Central - Unallocated
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
WESTERN REGION
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
State Ownership Sector
Modewise breakup
Grand TotalThermalNuclear
Hydro
(Renewable)
RES
(MNRE)
Total (Western
Region)
Goa
Daman amp Diu
Gujarat
Madhya Pradesh
Chhattisgarh
Maharashtra
Dadra amp Nagar
Naveli
File NoCEA-CH-14-1142018-Coordination Division
(As on 31102018)
Coal Gas Diesel Total
State 501000 23540 000 524540 000 167360 4875 696775
Private 387388 381318 3680 772386 000 000 693073 1465459
Central 167456 000 000 167456 12727 000 25000 205183
Sub-Total 1055844 404858 3680 1464382 12727 167360 722948 2367417
State 508250 000 000 508250 000 247993 4022 760265
Private 83945 83182 000 167127 000 000 375048 542175
Central 195612 000 000 195612 14873 000 1000 211485
Sub-Total 787807 83182 000 870989 14873 247993 380070 1513925
State 502000 000 12792 514792 000 359980 15533 890305
Private 195850 000 2520 198370 000 000 1275640 1474010
Central 282920 000 000 282920 69800 000 000 352720
Sub-Total 980770 000 15312 996082 69800 359980 1291173 2717035
State 000 000 15996 15996 000 188150 15402 219548
Private 61500 17400 000 78900 000 000 20899 99799
Central 114322 35958 000 150280 36200 000 5000 191480
Sub-Total 175822 53358 15996 245176 36200 188150 41301 510827
State 432000 52408 000 484408 000 220320 12270 716998
Private 483767 50310 41170 575247 000 000 1130984 1706231
Central 448952 000 000 448952 144800 000 18190 611942
Sub-Total 1364719 102718 41170 1508607 144800 220320 1161444 3035171
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 000 000
Central 10000 000 000 10000 000 000 000 10000
Sub-Total 10000 000 000 10000 000 000 000 10000
State 000 3250 000 3250 000 000 000 3250
Private 000 000 000 000 000 000 171 171
Central 24840 000 000 24840 8600 000 000 33440
Sub-Total 24840 3250 000 28090 8600 000 171 36861
178400 000 000 178400 45000 000 000 223400
State 1943250 79198 28788 2051236 000 1183803 52102 3287141
Private 1212450 532210 47370 1792030 000 000 3495815 5287845
Central 1422502 35958 000 1458460 332000 000 49190 1839650
Grand Total 4578202 647366 76158 5301726 332000 1183803 3597107 10414636
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
SOUTHERN REGION
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
State Ownership Sector
Modewise breakup
Grand TotalThermal RES
(MNRE)Nuclear
Hydro
(Renewable)
Kerala
Tamil Nadu
NLC
Puducherry
Central - Unallocated
Total (Southern
Region)
Andhra Pradesh
Telangana
Karnataka
File NoCEA-CH-14-1142018-Coordination Division
(As on 31102018)
Coal Gas Diesel Total
State 71000 000 000 71000 000 000 7070 78070
Private 28100 000 000 28100 000 000 25545 53645
Central 291433 000 000 291433 000 11000 000 302432
Sub-Total 390533 000 000 390533 000 11000 32615 434147
State 42000 000 000 42000 000 13000 405 55405
Private 73000 000 000 73000 000 000 3207 76207
Central 39374 000 000 39374 000 6100 000 45474
Sub-Total 154374 000 000 154374 000 19100 3612 177086
State 540000 10000 000 550000 000 98600 9195 657795
Private 242500 000 000 242500 000 000 34452 276952
Central 76077 000 000 76077 000 41000 000 117077
Sub-Total 858577 10000 000 868577 000 139600 43647 1051824
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 000 000
Central 698504 000 000 698504 000 18620 000 717124
Sub-Total 698504 000 000 698504 000 18620 000 717124
State 42000 000 000 42000 000 206192 630 248822
Private 293900 000 000 293900 000 000 21648 315548
Central 163390 000 000 163390 000 8900 1000 173290
Sub-Total 499290 000 000 499290 000 215092 23278 737660
State 000 000 000 000 000 36000 5211 41211
Private 000 000 000 000 000 39900 001 39901
Central 8703 000 000 8703 000 6400 000 15103
Sub-Total 8703 000 000 8703 000 82300 5212 96215
110183 000 000 110183 000 8501 000 118684
State 695000 10000 000 705000 000 353792 22511 1081303
Private 637500 000 000 637500 000 39900 84853 762253
Central 1387664 000 000 1387664 000 100520 1000 1489184
Grand Total 2720164 10000 000 2730164 000 494212 108364 3332740
(As on 31102018)
Coal Gas Diesel Total
State 000 32821 000 32821 000 10000 3001 45822
Private 000 2450 000 2450 000 000 1680 4130
Central 27902 43556 000 71458 000 36851 000 108309
Sub-Total 27902 78827 000 106729 000 46851 4681 158261
State 000 000 000 000 000 000 10710 10710
Private 000 000 000 000 000 000 539 539
Central 2470 4682 000 7152 000 11800 000 18952
Sub-Total 2470 4682 000 7152 000 11800 11249 30201
State 000 000 000 000 000 32200 3103 35303
Private 000 000 000 000 000 000 006 006
Central 3040 10969 000 14009 000 7446 000 21455
Sub-Total 3040 10969 000 14009 000 39646 3109 56764
State 000 16950 000 16950 000 000 1601 18551
Private 000 000 000 000 000 000 009 009
Central 3740 43695 000 47435 000 7077 500 55012
Sub-Total 3740 60645 000 64385 000 7077 2110 73572
State 000 000 3600 3600 000 000 545 4145
Private 000 000 000 000 000 000 217 217
Central 3140 7157 000 10297 000 9677 000 19974
Sub-Total 3140 7157 3600 13897 000 9677 762 24336
State 000 000 000 000 000 000 3067 3067
Private 000 000 000 000 000 000 100 100
Central 2140 4893 000 7033 000 5860 000 12893
Sub-Total 2140 4893 000 7033 000 5860 3167 16060
State 000 000 000 000 000 000 3647 3647
Private 000 000 000 000 000 000 020 020
Central 2070 4046 000 6116 000 9913 000 16029
Sub-Total 2070 4046 000 6116 000 9913 3667 19696
7500 6362 000 13862 000 14376 000 28238
State 000 49771 3600 53371 000 42200 25674 121245
Private 000 2450 000 2450 000 000 2571 5021
Central 52002 125360 000 177362 000 103000 500 280862
Grand Total 52002 177581 3600 233183 000 145200 28745 407128
Central - Unallocated
Total (Eastern
Region)
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
NORTH-EASTERN REGION
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
State Ownership Sector
Modewise breakup
Grand TotalThermalNuclear
Bihar
Jharkhand
West Bengal
DVC
Odisha
Sikkim
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
EASTERN REGION
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
Ownership Sector
Modewise breakup
Grand TotalThermalNuclear
Hydro
(Renewable)
RES
(MNRE)
Manipur
Nagaland
State
Mizoram
Central - Unallocated
Total (North-
Eastern Region)
Hydro
(Renewable)
RES
(MNRE)
Assam
Arunachal Pradesh
Meghalaya
Tripura
File NoCEA-CH-14-1142018-Coordination Division
(As on 31102018)
Coal Gas Diesel Total
State 000 000 4005 4005 000 000 525 4530
Private 000 000 000 000 000 000 146 146
Central 000 000 000 000 000 000 510 510
Sub-Total 000 000 4005 4005 000 000 1181 5186
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 075 075
Central 000 000 000 000 000 000 000 000
Sub-Total 000 000 000 000 000 000 075 075
State 000 000 4005 4005 000 000 525 4530
Private 000 000 000 000 000 000 221 221
Central 000 000 000 000 000 000 510 510
Grand Total 000 000 4005 4005 000 000 1256 5261
19
Andaman amp
Nicobar
lakshadweep
Total (Islands)
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
State Ownership Sector
Modewise breakup
Grand TotalThermalNuclear
Hydro
(Renewable)
RES
(MNRE)
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
ISLANDS
File NoCEA-CH-14-1142018-Coordination Division
SrNo Contents Page
1 Executive summary of Target and Achievement of Transmission Lines during 2018-19
20(1)
2 List of Transmission Lines CommissionedReady for commissioning during Oct-2018 20(2)
Section C - Transmission Lines
File NoCEA-CH-14-1142018-Coordination Division
Executive summary of Target and Achievement of Transmission Lines during 2018-19 As on Oct-18
(All figures in circuit kms)
Centr
al S
ecto
r
Sta
te S
ecto
r
JV
Private
Secto
r
To
tal
Centr
al S
ecto
r
Sta
te S
ecto
r
JV
Private
Secto
r
To
tal
Centr
al S
ecto
r
Sta
te S
ecto
r
JV
Private
Secto
r
To
tal
Centr
al S
ecto
r
Sta
te S
ecto
r
JV
Private
Secto
r
To
tal
Centr
al S
ecto
r
Sta
te S
ecto
r
JV
Private
Secto
r
To
tal
Cen
tral S
ecto
r
Sta
te S
ecto
r
JV
Pri
vate
Secto
r
Gra
nd
To
tal
0 0 0 0 0 0 0 0 4692 766 827 6285 3045 5906 980 9931 553 5878 0 6431 8290 12550 1807 22647
Oct18 Programme 0 0 0 0 0 0 0 0 300 0 0 300 662 90 562 1314 0 723 0 723 962 813 562 2337
Achievement 0 0 0 0 0 0 0 0 729 0 0 729 471 266 0 737 0 401 0 401 1200 667 0 1867
Upto Oct-18 Programme 0 0 0 0 0 0 0 0 3004 416 0 3420 1350 3109 562 5021 481 4346 0 4827 4835 7871 562 13268
Achievement 0 0 0 0 0 0 0 0 2286 0 178 2464 1436 1783 1595 4814 60 4461 0 4521 3782 6244 1773 11799
20(1)
220 kV Grand Total 800 kV 500 kV
Programme 2018-19
Programme
Achievement
HVDC765 kV 400 kV
File NoCEA-CH-14-1142018-Coordination Division
SlNo Line
Length
(cKM)
1 2 3 4 5 6
1 765 Jharsuguda - Dharamjaygarh line DC PGCIL 296
2 765LILO of Kurnool - Thirvualam line at
CuddapahDC PGCIL 190
3 765 Salem PS - Madhugiri PS line SC PGCIL 243
4 400 Cuddapah - Hindupur line (Q) DC PGCIL 338
5 400LILO of Both Ckt of Bamnauli - Samaypur at
TughlakabadMC PGCIL 114
6 400LILO-Out of Cuddapah - Hindupur line (Q)
(Both Ckts) at NP Kunta ssDC PGCIL 19
1200
7 400LILO of Sterlite - Meramundali at Lapanga
4oo kV ssDC OPTCL 14
8 400 Sterlite - Lapanga line DC OPTCL 37
9 400 TMDC Podili - Sattapenalli line DC APTRANSCO 215
10 230Neyveli 230110 kV ss - Eachangadu
230kV FeederSC TANTRANSCO 1
11 230 NNTPS - Neyveli 230110kV ss DC TANTRANSCO 2
12 220 Ajmer (400 kV) - Bherunda (TK) DC RVPNL 100
13 220 Aligarh - Atrauli line DC UPPTCL 77
14 220 Khandwa - Chhanera line DC MPPTCL 78
15 220LILO of one Ckt of Hadala - Sartanpar line
at Wankaner on MC towersDC GETCO 6
16 220 LILO of one Ckt of Vita - Miraj at Alkud ss DC MSETCL 27
17 220 Mendhigiri - Alkud ss DC MSETCL 110
667
1867
20(2)
Grand Total
2Transmission Lines (220 kV and above) CommissionedReady for commissioning During Oct-2018
As on 31-10-18
Voltage
Level (kV)Name of Transmission Lines
Circuit
Type
Executing
Agency
CENTRAL SECTOR
Total of CENTRAL SECTOR
STATE SECTOR Sector
Total of STATE SECTOR
File NoCEA-CH-14-1142018-Coordination Division
SN Contents Page
1 Executive summary of Target and Achievement of Substations during 2018-19 21(1)
2Sub Stations (220 kV and above) commissionedready for commisssioning during Oct-
201821(2)
Section D - Sub Stations
File NoCEA-CH-14-1142018-Coordination Division
1 Executive summary of Target and Achievement of Substations during 2018-19 As on Oct-18
(All figures in circuit MVA)
Centr
al S
ecto
r
Sta
te S
ecto
r
JV
Private
Secto
r
To
tal
Centr
al S
ecto
r
Sta
te S
ecto
r
JV
Private
Secto
r
To
tal
Centr
al S
ecto
r
Sta
te S
ecto
r
JV
Private
Secto
r
To
tal
Centr
al S
ecto
r
Sta
te S
ecto
r
JV
Private
Secto
r
To
tal
Centr
al S
ecto
r
Sta
te S
ecto
r
JV
Private
Secto
r
To
tal
Cen
tral S
ecto
r
Sta
te S
ecto
r
JV
Pri
vate
Secto
r
Gra
nd
To
tal
3000 0 0 3000 0 0 0 0 22200 0 0 22200 8185 13085 630 21900 740 14760 0 15500 34125 27845 630 62600
Oct18 Programme 0 0 0 0 0 0 0 0 0 0 0 0 1000 1260 630 2890 0 1400 0 1400 1000 2660 630 4290
Achievement 0 0 0 0 0 0 0 0 3000 0 0 3000 1500 3120 0 4620 0 2220 0 2220 4500 5340 0 9840
Upto Oct-18 Programme 0 0 0 0 0 0 0 0 10000 0 0 10000 6130 7435 630 14195 0 9670 0 9670 16130 17105 630 33865
Achievement 0 0 0 0 0 0 0 0 14000 0 0 14000 9000 7550 630 17180 0 10610 0 10610 23000 18160 630 41790
21(1)
220 kV Grand Total 800 kV 500 kV
Programme 2018-19
Programme
Achievement
HVDC765 kV 400 kV
File NoCEA-CH-14-1142018-Coordination Division
As on 31-10-18
Sl Voltage Ratio Capacity
No (kVkV) (MWMVA)
1 2 3 4 5
1 Cuddapah Ss 765400 PGCIL 3000
2 Tughlakabad SS (GIS) 400220 PGCIL 1500
Total of CENTRAL SECTOR 4500
3 Panki Kanpur (Aug) TF-I 400200 UPPTCL 75
4 Hindupur ss (1st ICT) 400220 APTRANSCO 315
5 Thappagundu ss 400110 TANTRANSCO 600
6 Mendhasal (2nd power TF) 400220 OPTCL 20
7 Jodhpur ss (New) 400220 RVPNL 315
8 Shankarpally 400220 TSTRANSCO 500
9 Podili ss (1st ICT) 400220 APTRANSCO 315
10 Doni (Gadag)SS 400220 KPTCL 1000
11 Porur (Addl TF) 230110 TANTRANSCO 100
12 Anuppankulam (Addl TF) 230110 TANTRANSCO 60
13 Neyveli SS 230110 TANTRANSCO 480
14 Savarkundla (Aug) 22066 GETCO 60
15 Bhuna (Aug) 220132 HVPNL 100
16 Madanpur (Aug) 22066 HVPNL 100
17 Gurgaon Sec-52A (Aug) 22066 HVPNL 160
18 IA Hisar (Aug) 220132 HVPNL 50
19 Narwana (Aug) 220132 HVPNL 60
20 Therubali (3rd Auto TF) 220132 OPTCL 160
21 Halasar ss 220132 RVPNL 160
22 Bansi Siddaharthnagar (Aug) TF-I 220132 UPPTCL 60
23 Hata Kushinagar (New) TF-I 220132 UPPTCL 100
24 Gomti nagar Lucknow (Aug) TF-IV 22033 UPPTCL 60
25 Kanpur Road Lucknow (New) TF-III 22033 UPPTCL 60
26 Asoj (Aug) 22066 GETCO 150
27 Kangasiyali (Aug) 22066 GETCO 60
28 Karmsad (Aug) 22066 GETCO 160
29 Lalpar (Aug) 22066 GETCO 60
TOTAL STATE SECTOR 5340
GRAND TOTAL 9840
21(2)
PRIVATE SECTOR
CENTRAL SECTOR
STATE SECTOR
2Sub-Stations (220 kV and above) CommissionedReady for commissioning During Oct-2018
Name of Sub StationsExecuting
Agency
File NoCEA-CH-14-1142018-Coordination Division
SN Contents Page
1 Electricity Generation (MU) Targets and Achievements for 2018-19 22
Section E - Electricity Generation
File NoCEA-CH-14-1142018-Coordination Division
Programme Achievement Ach Programme Achievement Ach
Central Sector 35160700 3028100 3162321 10443 20144400 21150469 10499
State Sector 35132000 3010000 3017260 10024 19922100 19549030 9813
PvtIPP Sector 36999700 3240600 3375603 10417 21598300 20794155 9628
PvtUTL Sector 1857600 164500 180597 10979 1130900 1203107 10638
Total 109150000 9443200 9735781 10310 62795700 62696761 9984
Central Sector 5617600 420900 451004 10715 4193000 4045436 9648
State Sector 6110600 559500 708469 12663 4049400 4433000 10947
PvtIPP Sector 1141800 80500 90122 11195 976400 1021963 10467
PvtUTL Sector 130000 11300 12564 11119 76700 99943 13030
Total 13000000 1072200 1262159 11772 9295500 9600342 10328
Central Sector 3850000 353300 303310 8585 2068900 2203540 10651
Total 3850000 353300 303310 8585 2068900 2203540 10651
Bhutan Import 500000 63300 35395 5592 347000 416660 12007
Central Sector 44628300 3802300 3916635 10301 26406300 27399445 10376
State Sector 41242600 3569500 3725729 10438 23971500 23982030 10004
Pvt Sector 40129100 3496900 3658886 10463 23782300 23119168 9721
Total 126500000 10932000 11336645 10370 74507100 74917303 10055
Provisional based on actual-cum-Assesment
Figs in MU
Cummulative
Achievement
Cummulative
Achievement
Sep-18 Sep-17 Upto Sep-2018 Upto Sep-2017
1073794 748889 7332680 5660929
22
Renewable Energy Generation
Achievement
Oct-2018
1 Electricity Generation (MU) Targets and Achievememts for 2018-19
All India Energy Generation During April 2018- Oct 2018 (MU)
Target (2018-19)April 2018- Oct 2018
Sector
Hydro
Thermal
Nuclear
627957
92955
20689
745071
626968
96003
22035
749173
0
100000
200000
300000
400000
500000
600000
700000
800000
Thermal Hydro Nuclear Total
Programme
Achievement
File NoCEA-CH-14-1142018-Coordination Division
SN Contents Page
1 Energy Power Supply Position (Provisional) for Oct-2018 and during April 2018- Oct 2018 23
2 Peak Power Supply Position (Provisional) for Oct-2018 and during April 2018- Oct 2018 24
3 Energy Power Supply Position (Revised) for Sep-2018 and during April 2018- Sept 2018 25
4 Peak Power Supply Position (Revised) for Sep-2018 and during April 2018- Sept 2018 26
5 Notified Power cuts Restrictions on Industries during Oct-2018 27
6 Power Supply to Agricultural Sector during Oct-2018 28
Section F - Power supply position
File NoCEA-CH-14-1142018-Coordination Division
आकड़ मममलयन यननट नट Figures in MU net
ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied
कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )
चडीगढ़ Chandigarh 108 108 0 00 1055 1055 0 00
दिलली Delhi 2490 2489 1 00 22524 22510 14 01
हरियजणज Haryana 4554 4554 0 00 35205 35205 0 00
दहमजचल परिश Himachal Pradesh 788 787 2 02 5728 5560 168 29
रमम कशमीि Jammu amp Kashmir 1497 1219 278 186 10982 8865 2117 193
परजब Punjab 4418 4418 0 00 38832 38819 13 00
िजरसथजन Rajasthan 6748 6748 0 00 45341 45181 160 04
उतति परिश Uttar Pradesh 10136 9973 164 16 75485 74808 676 09
उततिजखड Uttarakhand 1083 1081 3 03 8395 8310 85 10
उततरी कषतर Northern Region 31822 31375 447 14 243547 240314 3233 13
छततीसगढ़ Chhattisgarh 2454 2453 1 00 16119 16091 28 02
गरिजत Gujarat 11636 11636 0 00 70782 70768 14 00
मधय परिश Madhya Pradesh 5860 5859 1 00 38412 38410 2 00
महजिजषटर Maharashtra 15223 15095 128 08 95489 95355 134 01
िमन औि दिउ Daman amp Diu 216 216 0 00 1523 1523 0 00
िजिि व नगि हवली Dadra amp Nagar Haveli 553 553 0 00 3757 3757 0 00
गोवज Goa 366 366 0 00 2497 2495 2 01
पशचिमी कषतर Western Region 36308 36178 130 04 228579 228398 180 01
आनधर परिश Andhra Pradesh 5860 5854 6 01 37377 37334 43 01
तलगजनज Telangana 6748 6742 6 01 38251 38205 46 01
कनजाटक Karnataka 5842 5835 7 01 39111 39059 52 01
किल Kerala 2116 2096 20 09 14256 14160 96 07
तममल नजड Tamil Nadu 8611 8601 10 01 65742 65666 76 01
पडचिी Puducherry 216 215 1 05 1654 1646 8 05
लकष-दवीप Lakshadweep 4 4 0 0 27 27 0 0
दकषकषणी कषतर Southern Region 29392 29342 50 02 196390 196069 321 02
बबहजि Bihar 2742 2738 4 01 19143 18951 192 10
िजमोिि घजटी ननगम DVC 1712 1698 13 08 13096 12828 268 20
झजिखणड Jharkhand 701 697 4 06 5022 4949 73 15
ओडडशज Odisha 3147 3134 13 04 20224 20192 32 02
पशशचम बगजल West Bengal 4204 4200 4 01 33008 32881 127 04
मसशककम Sikkim 40 40 0 00 279 279 0 01
अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 67 202 188 13 67
परवी कषतर Eastern Region 12547 12507 40 03 90772 90080 692 08
अरणजचल परिश Arunachal Pradesh 67 66 1 09 502 496 7 13
असम Assam 833 809 24 29 6153 5903 250 41
मणणपि Manipur 72 71 1 10 485 478 7 14
मघजलय Meghalaya 147 147 0 00 1043 1042 0 00
ममज़ोिम Mizoram 63 62 1 08 365 359 5 14
नजगजलड Nagaland 76 67 8 110 540 481 59 109
बिपिज Tripura 130 129 1 09 1025 1007 19 18
उततर-परवी कषतर North-Eastern Region 1387 1351 35 25 10113 9766 346 34
समपणण भारत All India 111455 110753 702 06 769399 764627 4773 06
23
ऊराण वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Energy Power Supply Position Report (Provisional)
राजयStateअकरबर2018 October2018 अपरल2018 -अकरबर2018 April2018 to October2018
ऊरजा पनत ा म कमी ऊरजा पनत ा म कमीEnergy not Supplied
Excludes energy exported to Bangladesh
Energy not Supplied
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
File NoCEA-CH-14-1142018-Coordination Division
अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met
कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )
चडीगढ़ Chandigarh 217 217 0 00 369 369 0 00
दिलली Delhi 4713 4713 0 00 7016 7016 0 00
हरियजणज Haryana 7948 7948 0 00 10270 10270 0 00
दहमजचल परिश Himachal Pradesh 1520 1520 0 00 1520 1520 0 00
रमम कशमीि Jammu amp Kashmir 2836 2269 567 200 2951 2361 590 200
परजब Punjab 7979 7979 0 00 12638 12638 0 00
िजरसथजन Rajasthan 11450 11450 0 00 11698 11698 0 00
उतति परिश Uttar Pradesh 17434 16745 688 39 20498 20062 436 21
उततिजखड Uttarakhand 1943 1943 0 00 2143 2143 0 00
उततरी कषतर Northern Region 50659 49635 1024 20 63166 61726 1440 23
छततीसगढ़ Chhattisgarh 4414 4268 146 33 4414 4268 146 33
गरिजत Gujarat 18148 18130 19 01 18148 18130 19 01
मधय परिश Madhya Pradesh 11356 11317 39 03 11356 11317 39 03
महजिजषटर Maharashtra 23864 23159 705 30 23864 23254 610 26
िमन औि दिउ Daman amp Diu 342 341 1 02 357 356 1 02
िजिि व नगि हवली Dadra amp Nagar Haveli 784 780 4 05 816 815 1 01
गोवज Goa 536 536 0 00 596 596 0 00
पशचिमी कषतर Western Region 56548 55695 853 15 56548 55695 853 15
आनधर परिश Andhra Pradesh 9435 9435 0 00 9435 9435 0 00
तलगजनज Telangana 10603 10603 0 00 10815 10815 0 00
कनजाटक Karnataka 10741 10741 0 00 10741 10741 0 00
किल Kerala 3727 3644 83 22 4050 3997 53 13
तममल नजड Tamil Nadu 14747 14333 414 28 15029 14981 47 03
पडचिी Puducherry 363 362 1 03 420 400 19 46
लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0
दकषकषणी कषतर Southern Region 45279 45226 53 01 45946 45684 262 06
बबहजि Bihar 4945 4945 0 00 5050 5045 5 01
िजमोिि घजटी ननगम DVC 2729 2729 0 00 2874 2874 0 00
झजिखणड Jharkhand 1260 1260 0 00 1339 1284 55 41
ओडडशज Odisha 5624 5224 400 71 5624 5357 268 48
पशशचम बगजल West Bengal 8775 8775 0 00 9130 9123 7 01
मसशककम Sikkim 86 86 0 00 90 90 0 00
अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7
परवी कषतर Eastern Region 22959 22567 392 17 22959 22567 392 17
अरणजचल परिश Arunachal Pradesh 138 125 13 94 138 133 5 37
असम Assam 1785 1704 81 45 1865 1809 56 30
मणणपि Manipur 187 185 2 11 193 186 7 36
मघजलय Meghalaya 336 336 0 00 371 368 2 07
ममज़ोिम Mizoram 99 97 2 20 103 98 4 41
नजगजलड Nagaland 134 131 3 22 156 138 18 117
बिपिज Tripura 269 269 0 00 298 293 5 17
उततर-परवी कषतर North-Eastern Region 2790 2700 90 32 2967 2850 117 39
समपणण भारत All India 172945 170604 2341 14 177022 175528 1494 08
24
अधिकतम वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Peak Power Supply Position Report (Provisional)
आकड़ मगज वजट नट Figures in MW netअपरल2018 -अकरबर2018 April2018 to October2018
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
मजग की पनता म कमी Demand not Met
Excludes the supply to Bangladesh
राजयStateअकरबर2018 October2018
मजग की पनता म कमी Demand not Met
File NoCEA-CH-14-1142018-Coordination Division
आकड़ मममलयन यननट नट Figures in MU net
ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied
कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )
चडीगढ़ Chandigarh 141 141 0 00 947 947 0 00
दिलली Delhi 2925 2924 1 00 20034 20021 13 01
हरियजणज Haryana 4794 4794 0 00 30651 30651 0 00
दहमजचल परिश Himachal Pradesh 876 853 24 27 4940 4773 167 34
रमम कशमीि Jammu amp Kashmir 1520 1246 274 180 9485 7646 1839 194
परजब Punjab 5575 5575 0 00 34414 34401 13 00
िजरसथजन Rajasthan 6202 6201 0 00 38594 38434 160 04
उतति परिश Uttar Pradesh 10211 10124 86 08 65349 64836 513 08
उततिजखड Uttarakhand 1162 1149 13 11 7311 7229 82 11
उततरी कषतर Northern Region 33405 33008 398 12 211725 208939 2786 13
छततीसगढ़ Chhattisgarh 2403 2388 15 06 13665 13638 27 02
गरिजत Gujarat 10122 10122 0 00 59146 59132 14 00
मधय परिश Madhya Pradesh 5492 5491 1 00 32552 32551 1 00
महजिजषटर Maharashtra 13615 13612 3 00 80266 80260 6 00
िमन औि दिउ Daman amp Diu 221 221 0 00 1306 1306 0 00
िजिि व नगि हवली Dadra amp Nagar Haveli 551 551 0 00 3204 3204 0 00
गोवज Goa 339 339 0 00 2131 2128 2 01
पशचिमी कषतर Western Region 32742 32723 19 01 192270 192220 50 00
आनधर परिश Andhra Pradesh 5294 5287 7 01 31518 31480 37 01
तलगजनज Telangana 6279 6272 8 01 31503 31463 40 01
कनजाटक Karnataka 5701 5693 8 01 33269 33225 45 01
किल Kerala 2050 2026 24 12 12140 12063 76 06
तममल नजड Tamil Nadu 8971 8959 12 01 57131 57065 66 01
पडचिी Puducherry 226 224 2 08 1438 1431 7 05
लकष-दवीप Lakshadweep 4 4 0 0 23 23 0 0
दकषकषणी कषतर Southern Region 28520 28460 60 02 166998 166727 271 02
बबहजि Bihar 2839 2793 46 16 16400 16213 188 11
िजमोिि घजटी ननगम DVC 1901 1750 151 79 11384 11130 254 22
झजिखणड Jharkhand 740 723 17 22 4321 4252 69 16
ओडडशज Odisha 2921 2918 3 01 17077 17058 19 01
पशशचम बगजल West Bengal 4902 4879 23 05 28804 28681 123 04
मसशककम Sikkim 39 39 0 01 239 239 0 01
अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 67 173 162 12 67
परवी कषतर Eastern Region 13341 13102 240 18 78225 77573 652 08
अरणजचल परिश Arunachal Pradesh 74 73 1 10 435 429 6 14
असम Assam 950 914 36 38 5320 5094 226 43
मणणपि Manipur 70 69 1 11 414 408 6 15
मघजलय Meghalaya 150 150 0 01 896 896 0 01
ममज़ोिम Mizoram 58 57 1 12 302 297 5 16
नजगजलड Nagaland 80 72 8 104 464 414 50 108
बिपिज Tripura 192 191 1 07 895 878 17 19
उततर-परवी कषतर North-Eastern Region 1575 1527 48 31 8726 8415 311 36
समपणण भारत All India 109584 108819 765 07 657944 653873 4071 06
Energy not Supplied Energy not Supplied
ससतबर2018 September2018 अपरल2018 -ससतबर2018 April2018 to September2018
ऊरजा पनत ा म कमी ऊरजा पनत ा म कमी
Excludes energy exported to Bangladesh
राजयState
ऊराण वरवदयत आपरतण शथिरत ररपोरण (सशोधित) Energy Power Supply Position Report (Revised)
25
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
File NoCEA-CH-14-1142018-Coordination Division
अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met
कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )
चडीगढ़ Chandigarh 293 293 0 00 369 369 0 00
दिलली Delhi 5358 5358 0 00 7016 7016 0 00
हरियजणज Haryana 9008 9008 0 00 10270 10270 0 00
दहमजचल परिश Himachal Pradesh 1466 1466 0 00 1479 1479 0 00
रमम कशमीि Jammu amp Kashmir 2951 2361 590 200 2951 2361 590 200
परजब Punjab 11405 11405 0 00 12638 12638 0 00
िजरसथजन Rajasthan 10612 10612 0 00 11698 11698 0 00
उतति परिश Uttar Pradesh 18346 18121 225 12 20498 20062 436 21
उततिजखड Uttarakhand 1996 1996 0 00 2143 2143 0 00
उततरी कषतर Northern Region 56407 55649 758 13 63166 61726 1440 23
छततीसगढ़ Chhattisgarh 4404 4075 328 75 4404 4136 268 61
गरिजत Gujarat 16963 16963 0 00 17053 16963 90 05
मधय परिश Madhya Pradesh 8811 8771 41 05 8811 8775 36 04
महजिजषटर Maharashtra 22455 22349 106 05 23395 23254 141 06
िमन औि दिउ Daman amp Diu 357 356 1 02 357 356 1 02
िजिि व नगि हवली Dadra amp Nagar Haveli 816 815 1 01 816 815 1 01
गोवज Goa 596 596 0 00 596 596 0 00
पशचिमी कषतर Western Region 52933 52895 38 01 53841 52895 945 18
आनधर परिश Andhra Pradesh 9435 9416 19 02 9435 9416 19 02
तलगजनज Telangana 10815 10815 0 00 10815 10815 0 00
कनजाटक Karnataka 10103 10090 13 01 10690 10688 2 00
किल Kerala 3888 3638 251 64 4050 3997 53 13
तममल नजड Tamil Nadu 14556 14553 3 00 15029 14981 47 03
पडचिी Puducherry 390 372 17 45 420 400 19 46
लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0
दकषकषणी कषतर Southern Region 45542 45428 114 02 45946 45684 262 06
बबहजि Bihar 5050 5045 5 01 5050 5045 5 01
िजमोिि घजटी ननगम DVC 2641 2641 0 00 2874 2874 0 00
झजिखणड Jharkhand 1233 1233 0 00 1339 1284 55 41
ओडडशज Odisha 4906 4906 0 00 5357 5357 0 00
पशशचम बगजल West Bengal 8644 8639 5 01 9130 9123 7 01
मसशककम Sikkim 78 78 0 00 90 90 0 00
अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7
परवी कषतर Eastern Region 22110 22100 10 00 22470 22290 180 08
अरणजचल परिश Arunachal Pradesh 132 130 2 15 138 133 5 37
असम Assam 1865 1809 56 30 1865 1809 56 30
मणणपि Manipur 184 182 2 13 193 186 7 36
मघजलय Meghalaya 317 317 0 00 371 368 2 07
ममज़ोिम Mizoram 95 93 2 23 103 98 4 41
नजगजलड Nagaland 142 138 5 32 156 138 18 117
बिपिज Tripura 296 293 3 10 298 293 5 17
उततर-परवी कषतर North-Eastern Region 2921 2850 71 24 2967 2850 117 39
समपणण भारत All India 177022 175528 1494 08 177022 175528 1494 08
26
मजग की पनता म कमी मजग की पनता म कमी Demand not MetDemand not Met
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
Excludes the supply to Bangladesh
अधिकतम वरवदयत आपरतण शथिरत ररपोरण (सशोधित) Peak Power Supply Position Report (Revised)
आकड़ मगज वजट नट Figures in MW net
राजयStateससतबर2018 September2018 अपरल2018 -ससतबर2018 April2018 to September2018
File NoCEA-CH-14-1142018-Coordination Division
अकरबर2018 October2018अपरल2018 -अकरबर2018 April2018 to October2018
उततरी कषतर Northern Region
चडीगढ़ Chandigarh Data not received Data not received
दिलली Delhi
हरियजणज Haryana
दहमजचल परिश Himachal Pradesh
रमम कशमीि Jammu amp Kashmir Data not received Data not received
परजब Punjab
िजरसथजन Rajasthanउतति परिश Uttar Pradesh
उततिजखड Uttarakhand
पशचिमी कषतर Western Region
छततीसगढ़ Chhattisgarh
गरिजत Gujarat
मधय परिश Madhya Pradesh
महजिजषटर Maharashtra
गोवज Goa
दकषकषणी कषतर Southern Region
आनधर परिश Andhra Pradesh
तलगजनज Telangana
कनजाटक Karnataka
किल Kerala
तममल नजड Tamil Nadu
पडचिी Puducherryपरवी कषतर Eastern Region
बबहजि Bihar
झजिखणड Jharkhand
ओडडशज Odisha
पशशचम बगजल West Bengal
N
o No
tified
Cuts
N
o No
tified
Cuts
27
अकरबर 2018 म इडथरीर पर वरवदयत करौती का वरवरवरण Notified Power CutsRestrictions on Industries during October2018
राजय कषतर State Regionऊराणमाग करौती EnergyDemand Cut
No Notified Cuts No Notified Cuts
File NoCEA-CH-14-1142018-Coordination Division
अकरबर2018 October2018अपरल2018 -अकरबर2018 April2018 to October2018
उततरी कषतर Northern Region
चडीगढ़ Chandigarh Data not received Data not received
दिलली Delhi Data not received Data not received
हरियजणज Haryana 940 hrsday 0709 - 0950 hrsday
दहमजचल परिश Himachal Pradesh No cut imposed on agriculture consumers and uninterrupted
power is being supplied to agriculture sector
HPSEBL has only 2 agriculture consumers and uninterrupted
power is being supplied to agriculture sector
रमम कशमीि Jammu amp Kashmir Data not received Data not received
परजब Punjab 0507 hrsday 0349 - 0844 hrsday
िजरसथजन Rajasthan 0630 hrsday 0630 hrsday
उतति परिश Uttar Pradesh 1825 hrsday 1814 - 1858 hrsday
उततिजखड Uttarakhand 2350 hrsday 2128 - 2357 hrsday
पशचिमी कषतर Western Region
छततीसगढ़ Chhattisgarh 18hoursday 18 hrsday
गरिजत Gujarat 805 hrsday 805 hrsday
मधय परिश Madhya Pradesh Three-Phase Supply(Irrigation)-947 hrs day
Three-Phase (Mixed) Supply - 2311 hrs day
Three-Phase Supply(Irrigation)- 0933 - 0947 hrs day Three-
Phase (Mixed) Supply - 2300 - 2320 hrs day
महजिजषटर Maharashtra Three-Phase Supply(Irrigation)- 9 hrs day
Three-Phase (Mixed) Supply - 24 hrs day
Three-Phase Supply(Irrigation)- 9 hrs day
Three-Phase (Mixed) Supply - 24 hrs day
गोवज Goa No restriction No restriction
दकषकषणी कषतर Southern Region
आनधर परिश Andhra Pradesh 07 hrsday 07 hrsday
तलगजनज Telangana 24 hoursday 24 hoursday
कनजाटक Karnataka 6 hrsday 6 hrsday
किल Kerala No Restrictions No Restrictions
तममल नजड Tamil Nadu 9 hrsday (6 hrs during day time and 3 hrs during night time) 9 hrsday (6 hrs during day time and 3 hrs during night time)
पडचिी Puducherry No Restrictions No Restrictions
परवी कषतर Eastern Region
बबहजि Bihar About 18 hrsday About 18 hrsday
झजिखणड Jharkhand About 20 hrsday About 20 hrsday
ओडडशज Odisha 24 hrsday 24 hrsday
पशशचम बगजल West Bengal About 23 hrsday About 23 hrsday
28
अकटबर 2018 कषि कषतर को षिदयत आपरति का षििरण Power Supply to Agricultural Sector during October2018
राजय कषतर State Regionऔसत वरवदयत आपरतण घनरो म Average Hours of Supply
On segregated feeders
File NoCEA-CH-14-1142018-Coordination Division
SNo Contents Page
1 Growth of Installed Capacity since 6th Plan 29
2 Progress of Transmission Sector since 6th Plan 30
3 All India Yearly Coal consumption for Power Generation (Utilities)
4 All India Annual Per Capita Consumption of Electricity since -2006
5 Average cost of power supply amp Average realisation (Paisakwh)
6 Growth of Rural Electrification amp Pump Sets Energisation
7 Status of Hydro Schemes Cleared by the CEA in Oct-2018
Section G - Growth of Power Sector
31
32
File NoCEA-CH-14-1142018-Coordination Division
(In MW)
Coal Gas Diesel Total
End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472
End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634
End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537
End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596
End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921
End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703
End of 12th Plan 19216288 2532938 83763 21832988 6780 4447842 50018 31960630
Up to Oct-2018 19599250 2493722 837629 22176734 6780 4548742 7201281 34604757
Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-17) = 51529 MW
Electricity Generation (MU) Targets and Achievements for 2016-17
Coal Gas Diesel Nuclear Hydro Res Total
1959925 2493722 837629 678000 454874 72012805 22925174
29
1 Growth of Installed Capacity Since 6th Plan
Plan YearThermal
Nuclear Hydro RES (MNRE) Total
Total Installed Capacity 34604757 MW
Coal Gas Diesel Nuclear Hydro Res
File NoCEA-CH-14-1142018-Coordination Division
Progress of Transmission Sector in the Country up to Oct 2018
1 TRANSMISSION LINES (All fig in CKM)
At the end of
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
6th plan 0 0 0 0 0 0 0 0 0 0 0 0 1831 4198 0 6029 1641 44364 0 46005 3472 48562 0 52034
7th plan 0 0 0 0 0 0 0 0 0 0 0 0 13068 6756 0 19824 4560 55071 0 59631 17628 61827 0 79455
8th plan 0 0 0 0 1634 0 0 1634 0 0 0 0 23001 13141 0 36142 6564 73036 0 79600 31199 86177 0 117376
9th plan 0 0 0 0 3234 1504 0 4738 751 409 0 1160 29345 20033 0 49378 8687 88306 0 96993 42017 110252 0 152269
10th plan 0 0 0 0 4368 1504 0 5872 1775 409 0 2184 48708 24730 0 73438 9444 105185 0 114629 64295 131828 0 196123
11th Plan 0 0 0 0 5948 1504 1980 9432 4839 411 0 5250 71023 30191 5605 106819 10140 125010 830 135980 91950 157116 8415 257481
12th Plan 6124 0 0 6124 5948 1504 1980 9432 25465 1177 4598 31240 92482 48240 17065 157787 11014 151276 978 163268 141033 202197 24621 367851
13th Plan (Up
to Mar2018)6124 0 0 6124 5948 1504 1980 9432 28666 1512 4881 35059 98247 54286 19067 171600 11258 156497 1000 168755 150243 213799 26928 390970
13th Plan (Up
to Sep-18)6124 0 0 6124 5948 1504 1980 9432 30952 1512 5059 37523 99683 56069 20662 176414 11318 160958 1000 173276 154025 220043 28701 402769
27150
75050
47900
118050
90650
30
IR addition in 12th Plan (up to
March 2017)
Total IR (up to Oct-18)
IR at the end of 11th Plan
IR at the end of 12th Plan
Envisaged IR Capacity at the end
of 13th Plan
Grand Total
Note - The figure upto the end of 10th plan in for stringing progress including the lines not commissioned Now only commissioned lines are reckoned Accordingly the figure for 10th plan (end) may read as 187555 after adjusting with (-) 10852 Ckm
Inter-regional Power Transfer Capacity
plusmn 800 kV HVDC plusmn 500 kV HVDC 765 kV 400 kV 220 kV
File NoCEA-CH-14-1142018-Coordination Division
2004-05 27800
2005-06 28100
2006-07 30200
2007-08 33000
2008-09 35500
2009-10 36700
2010-11 38700
2011-12 41756
2012-13 45460
2013-14 48940
2014-15 53040
2015-16 54590
2016-17 57430
2017-18 60800
Year
2005-06
2006-07
2007-08
2008-09
2009-10
2010-11
2011-12
2012-13
2013-14
2014-15
2015-16
2016-17
2017-18
2004-05 254 209 7568
2005-06 260 221 7636
2006-07 276 227 7423
2007-08 293 239 7727
2008-09 340 263 8713
2009-10 355 268 8870
2010-11 398 303 11975
2011-12 455 330 13514
2012-13 501 376 14867
2013-14 518 175
2014-15 520
6719
7171
3 All India yearly Coal Consumption for Power Generation (Utilities)
YEARCoal Consumption
Million Tonnes
4 All India Annual per Capita consumption of Electricity Since 2006
Per Capita Consumption ( kWh)
6314
(GrossGen+ Net Import) Mid-year population
5 Average cost of power supply amp average realization ( paiseKWH )
Yearcost of supply
(paiseunit)
Realization(paiseunit)
Including AgricultureOnly
Agriculture
1149
7335
7786
91441
8188
88363
957
1010
1075
1122
File NoCEA-CH-14-1142018-Coordination Division
Source- PFC Reports on the performance of State Power Utilities 31
File NoCEA-CH-14-1142018-Coordination Division
Sl
NoExecuting Agency
Installed
Capacity (MW)Cost (Rs crore)
Date of
Clearance
32
No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification
since 2004-05
65291374575 296361511th Plan
Cumu upto End of 11th Plan
596556 21212860
557439Cummulative up to end of 12th Plan
46708
18423975
499150
2003-042004-05
5743
9769
Cumu upto End of 10th Plan
010407 to 310308
010410 to 310311557976840909
010411 to 310312
412667
86293726
3207
482864
12632
1576036
4451722594
15455554
2314176
397343611750
2093311060316074
65109527813884
6 Growth Of Rural Electrification amp Pumpsets Energisation
Plan Year
9th Plan2002-03
134092626
4111
Pump Sets Energised Villages Electricfied (Nos)
2001-02
284064367244
1218
27801997-981998-991999-002000-01
297594
010408 to 310309010409 to 310310
10th Plan
2005-062006-07
322968331020
Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as
Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received
from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made
available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified
villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is
independent of the earlier published reports
No Hydro Electric Project has been issued concurrenceAppraisal letter by CEA during October 2018
7 Status of Hydro Schemes Cleared by the CEA in Oct-2018
Name of Scheme
File NoCEA-CH-14-1142018-Coordination Division
SN Contents Page
1 Rate of sale of power for the year 2016-17 33-41
RATE OF SALE OF POWER FOR THE YEAR 2016-17
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) NORTHERN REGION
CENTRAL SECTOR
BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 18000 66900 19800
CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 54000 222400 21600
CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 30000 144400 19600
CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 23100 91700 42600
PARBATI - III HPS NHPC LTD HYDRO-HYDRO 52000 68200 54800
DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 28000 95600 30000
CHUTAK NHPC LTD HYDRO-HYDRO 4400 22000 79800
DULHASTI HPS NHPC LTD HYDRO-HYDRO 39000 228000 56400
SALAL HPS NHPC LTD HYDRO-HYDRO 69000 342300 11000
TANAKPUR HPS NHPC LTD HYDRO-HYDRO 9420 43000 29600
URI HPS -I NHPC LTD HYDRO-HYDRO 48000 280300 16000
URI HPS - II NHPC LTD HYDRO-HYDRO 24000 147300 48600
NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 4500 24600 88200
SEWA - II NHPC LTD HYDRO-HYDRO 12000 47100 43400
ANTA CCPP NTPC LTD THERMAL-GASN 41930 67539 32400
AURAIYA CCPP NTPC LTD THERMAL-GASN 66336 53501 39100
BADARPUR TPS NTPC LTD THERMAL-COAL 70500 159153 44800
DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 84000 296170 42300
DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 98000 526686 46300
DADRI CCPP NTPC LTD THERMAL-GASHSD 82978 227469 33000
FARIDABAD CCPP NTPC LTD THERMAL-GASN 43159 115577 30800
RIHAND STPS I NTPC LTD THERMAL-COAL 100000 596766 24500
RIHAND STPS II NTPC LTD THERMAL-COAL 100000 737069 24600
RIHAND STPS III NTPC LTD THERMAL-COAL 100000 706546 30600
SINGRAULI STPS NTPC LTD THERMAL-COAL 200000 1394068 20400
TANDA TPS NTPC LTD THERMAL-COAL 44000 295438 40800
UNCHAHAR TPS I NTPC LTD THERMAL-COAL 42000 256454 39800
UNCHAHAR TPS II NTPC LTD THERMAL-COAL 42000 273577 38900
UNCHAHAR TPS III NTPC LTD THERMAL-COAL 21000 142780 43000
KOLDAM NTPC LTD HYDRO-HYDRO 80000 363260 43600
NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 303575 25841
RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 108000 668677 35374
NJHPS SJVNL HYDRO-HYDRO 150000 699496 23820
RAMPUR HPS SJVNL HYDRO-HYDRO 41202 195982 32260
TEHRI HPP THDC HYDRO-HYDRO 100000 272543 51800
KOTESHWAR HEP THDC HYDRO-HYDRO 40000 106244 53400
IGSTPS JHAJJAR ARAVALI P CPL THERMAL-COAL 150000 510429 49490
NEYVELI BARSINGSAR NEYVELI LIG CORP LTD THERMAL-LIG 25000 127520 38040
STATE SECTOR
PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 21000 14222 48200
PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 21000 19205 48400
PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 25000 102257 42600
PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 25000 62107 41800
DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 60000 312213 41000
RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 120000 35767442200
WYC HYDEL STATION HPGCL HYDRO-HYDRO 6240 20365 24900
GIRI POWER HOUSE HPSEB HYDRO-HYDRO 6000 13958 7600
ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 1695 5467 11900
BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 12000 18528 6700
GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 2250 7462 22500
BASSI POWER HOUSE HPSEB HYDRO-HYDRO 6600 29649 7500
BINWA POWER HOUSE HPSEB HYDRO-HYDRO 600 2749 19300
ANNEXURE-I
RATE OF SALE OF POWER FOR THE YEAR 2016-2017
Page 33
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) GAJ POWER HOUSE HPSEB HYDRO-HYDRO 1050 2914 26700
BANER POWER HOUSE HPSEB HYDRO-HYDRO 1200 2864 16200
HOLI POWER HOUSE HPSEB HYDRO-HYDRO 300 616 22500
THIROT POWER HOUSE HPSEB HYDRO-HYDRO 450 1126 22500
KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 1200 3064 22500
LARJI POWER HOUSE HPSEB HYDRO-HYDRO 12600 53677 23700
NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 250 750 31000
CHABA POWER HOUSE HPSEB HYDRO-HYDRO 175 465 23300
RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 150 101 13400
SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 200 000 22500
KILLAR HPSEB HYDRO-HYDRO 030 050 22500
BHABA AUGUMENP H HPSEB HYDRO-HYDRO 450 1276 22500
BS CHAMBA HPSEB HYDRO-HYDRO 045 099 19500
GUMMA HPSEB HYDRO-HYDRO 300 423 22500
GAS TURBINE POWER STATION IPGCL THERMAL-GAS 27000 67233 39300
PPS-I PPCL THERMAL-GAS 33000 175905 38300
PPS-III PPCL THERMAL-GAS 137120 196879 36100
LOWER JHELUM JampKPDD HYDRO-HYDRO 10500 60214 5100
UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 2260 10514 6300
UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 10500 44202 8500
GANDHARBAL JampKPDD HYDRO-HYDRO 1500 8925 4700
KARNAH MPH JampKPDD HYDRO-HYDRO 200 1122 31000
CHENANI I JampKPDD HYDRO-HYDRO 2330 10892 6600
CHENANI II JampKPDD HYDRO-HYDRO 200 1188 9300
CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 750 3634 14200
IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 375 2108 18500
IGO MERCHELLONG JampKPDD HYDRO-HYDRO 300 1572 29700
PAHALGAM MHP JampKPDD HYDRO-HYDRO 450 1713 32900
MARPACHOO JampKPDD HYDRO-HYDRO 075 375 29800
HAFTAL JampKPDD HYDRO-HYDRO 100 483 28700
SANJAK JampKPDD HYDRO-HYDRO 126 441 36000
SEWA-III JampKPDD HYDRO-HYDRO 900 3273 20200
BHADERWAH JampKPDD HYDRO-HYDRO 150 935 8900
BAZGO JampKPDD HYDRO-HYDRO 030 108 33300
SUMOOR JampKPDD HYDRO-HYDRO 010 045 35400
HUNDER JampKPDD HYDRO-HYDRO 040 176 26200
STAKNA JampKPDD HYDRO-HYDRO 400 1933 4100
KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 124000 662879 31360
SURATGARH TPS RRVUNL THERMAL-COAL 150000 402328 41730
CHHABRA TPS 1amp 2 RRVUNL THERMAL-COAL 50000 305946 36700
CHHABRA TPS 3 RRVUNL THERMAL-COAL 25000 151536 36700
CHHABRA TPS 4 RRVUNL THERMAL-COAL 25000 155896 36700
RAMGARH GT POWER PROJECT RRVUNL THERMAL-COAL 22050 43177 41800
RAMGARH GAS T P PROJECT 3 RRVUNL THERMAL-GAS 5000 93615 41800
DHOLPUR C C POWER PROJECT RRVUNL THERMAL-R-LNG 33000 9486 46110
MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 14000 20855 34192
MINI MICRO HYDEL (MMH) P S RRVUNL HYDRO-HYDRO 2385 851 37800
KALISINDH TPP 1 RRVUNL THERMAL-COAL 60000 341543 45000
KALISINDH TPP 2 RRVUNL THERMAL-COAL 60000 211588 45000
KHARA HEP UPJVNL HYDRO-HYDRO 7200 26654 7200
MATATILLA HEP UPJVNL HYDRO-HYDRO 3060 12219 6500
OBRA HEP UPJVNL HYDRO-HYDRO 9900 21517 6300
RIHAND UPJVNL HYDRO-HYDRO 30000 57369 5500
ANPARA A TPS UPRVUNL THERMAL-COAL 63000 317536 27000
ANPARA B TPS UPRVUNL THERMAL-COAL 100000 705605 22700
ANPARA D UPRVUNL THERMAL-COAL 100000 300158 39800
HARDUAGANJ TPS UPRVUNL THERMAL-COAL 16500 45817 49200
HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 50000 304389 46600
OBRA A TPS UPRVUNL THERMAL-COAL 28800 13158 34000
OBRA B TPS UPRVUNL THERMAL-COAL 100000 328124 21900
Page 34
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) PANKI TPS UPRVUNL THERMAL-COAL 21000 66488 50300
PARICHHA TPS UPRVUNL THERMAL-COAL 22000 38762 49400
PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 42000 231931 45600
PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 50000 276722 50400
CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 24000 70845 8290
CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 14400 75366 8390
DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 3375 9595 12080
DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 5100 18701 10520
KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4140 17359 12330
KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 12000 33001 9420
KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 3000 11953 8320
TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 9000 33983 12460
MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 30400 124510 16110
RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 19800 17897 10550
MPUR UTTARAKHAND JVNL HYDRO-HYDRO 930 5121 19200
PATHRI UTTARAKHAND JVNL HYDRO-HYDRO 2040 11636 14200
GALOGI UTTARAKHAND JVNL HYDRO-HYDRO 300 648 12500
PRIVATE SECTOR
MGTPP CLP INDIA PVT LTD THERMAL-COAL 132000 268902 41940
SHRINAGAR HEP ALAKNANDA HPCL HYDRO-HYDRO 33000 127414 48800
GAMA INFRAPROP CCPP GAMA INFRAPROP PVT THERMAL-GAS 22500 52686 47000
PPGCL (BARA) JP POWER VENTURES LTD THERMAL-COAL 198000 448200 38500
MALANA HEP MALANA PCL HYDRO-HYDRO 8600 26354 29792
MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 10000 30369 32580
ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 19200 56347 36079
KASHANG HEP H P PCL HYDRO-HYDRO 19500 5034 29200
BASPA-II HEP HBPCL HYDRO-HYDRO 30000 132769 13600
KARCHAM WANGTOO HEP HBPCL HYDRO-HYDRO 100000 434386 36600
RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 108000 582600 43700
RITHALA COMBI CY POWER PLANT TATA POWER DDL THERMAL-GAS 9480 000 11900
RAJPURA TPS NABHA POWER LTD THERMAL-GAS 140000 901484 39000
TALWANDI SABO POWER LTD TALWANDI SABO POWER LTD THERMAL-COAL 198000 636040 49548
ROJA THERMAL POWER STATION ROJA POWER SCL THERMAL-COAL 120000 727200 43400
KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 34400 63400
BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 36000 62600
MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 38200 60800
UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 37900 61500
KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 42300 58800
LALITPUR PGCL BAJAJ ENERGY PVT LTD THERMAL-COAL 198000 359400 47300
PRAYAGRAJ PGCL PRAYAGRAJ PGCL THERMAL-COAL 132000 448200 38595
KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 132000 783182 33438
WESTERN REGION
CENTRAL SECTOR
INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 100000 325333 23892
OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 52000 141663 34001
GANDHAR CCPP NTPC LTD THERMAL-GAS 65739 221924 28700
KAWAS CCPP NTPC LTD THERMAL-GASN 65620 167929 27000
KORBA I amp II NTPC LTD THERMAL-COAL 210000 1499171 20500
KORBA III NTPC LTD THERMAL-COAL 50000 358746 26600
SIPAT STPS I NTPC LTD THERMAL-COAL 198000 1479902 26800
SIPAT STPS II NTPC LTD THERMAL-COAL 100000 766549 26500
VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 126000 693142 25800
VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 100000 608781 23800
VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 100000 673475 27600
VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 100000 655924 32900
VINDHYACHAL STPS V NTPC LTD THERMAL-COAL 50000 328265 31700
MOUDA I NTPC LTD THERMAL-COAL 100000 343130 44500
MOUDA Ii NTPC LTD THERMAL-COAL 66000 40637 39900
RATNAGIRI GAS amp POWER PVT LTD RGPPL THERMAL-GAS 196708 442485 47000
KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 000 24729
TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 32000 201227 10740
Page 35
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 365122 19069
TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 787444 29324
STATE SECTOR
GSEG-HAZIRA15610 MW GUJARAT S ENEGEN LTD THERMAL-GAS 15610 1805 28200
GSEG-HAZIRA35143 MW GUJARAT S ENEGEN LTD THERMAL-GAS 35130 22276 51300
GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 21978 51800
AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 13929 26100
KORBA TPS EAST CSPGCL THERMAL-COAL 44000 198673 33880
DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 365808 27570
KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 316500 30420
HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 532878 19410
CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 515 58300
MTTPS CHAMPA U-I CSPGCL THERMAL-COAL 50000 220376 39000
MTTPS CHAMPA U-II CSPGCL THERMAL-COAL 50000 23709 10000
SHP GANGREL CSPGCL HYDRO-HYDRO 1000 2350 36790
BANGO HEP CSPGCL HYDRO-HYDRO 12000 14662 8900
MHP KORBA WEST CSPGCL HYDRO-HYDRO 170 859 38190
SIKASAR HEP CSPGCL HYDRO-HYDRO 700 418 26870
DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8843 74500
DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 19446 51500
GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 66388 71600
GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127488 41300
KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 96072 43900
KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 29841 56400
SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 184966 58800
UKAI 1-5 GSECL THERMAL-COAL 85000 204891 46900
UKAI TPS 6 GSECL THERMAL-COAL 50000 284448 48200
WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 271999 58300
WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 82808 44100
KADANA HPS GSECL HYDRO-HYDRO 24200 34433 16800
UKAI HPS GSECL HYDRO-HYDRO 30500 40585 6100
TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 123000 11500
BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 8900 10900
BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 7200 27500
JHINNA HPS MPPGCL HYDRO-HYDRO 2000 9700 18500
RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 44300 3400
GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 17300 4600
SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 4100 16900
MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 14600 27000
PENCH HPS MPPGCL HYDRO-HYDRO 16000 23700 8100
RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 3000 16900
AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 134400 35100
SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 283800 38700
SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 344600 34300
SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 111600 61600
SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 211800 58000
SSTPS PH-I MPPGCL THERMAL-COAL 120000 233100 84300
BHUSAWAL TPS MSPGCL THERMAL-COAL 142000 566258 51100
CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1365682 33700
KHAPERKHEDA MSPGCL THERMAL-COAL 134000 706207 39100
KORADI TPS MSPGCL THERMAL-COAL 62000 443206 42000
NASIK TPS MSPGCL THERMAL-COAL 63000 297275 47000
PARLI TPS MSPGCL THERMAL-COAL 113000 175934 71600
PARAS MSPGCL THERMAL-COAL 50000 267931 38700
URAN CCPP MSPGCL THERMAL-GAS 67200 320330 30600
KOYANA MSPGCL HYDRO-HYDRO 195600 328155 13100
SMALL HYDRO POWER PLANTS MSPGCL HYDRO-HYDRO 45400 93062 30500
BHIRA MSPGCL HYDRO-HYDRO 8000 10046 8400
TILLARI MSPGCL HYDRO-HYDRO 8900 10584 3100
SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 233298 20500
SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 87633 20500
PRIVATE SECTOR
Page 36
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 81282 46750
JNSTPP(JAYPEE NIGRIE) JP POWER VENTURES LTD THERMAL-COAL 132000 726695 29310
MB POWER MB POWER THERMAL-COAL 120000 345632 38310
ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 754922 28671
ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 780761 23495
ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 198000 1263784 32090
ADANI POWER MAHARA ADANI POWER LTD THERMAL-COAL 330000 1666191 34124
AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 170065 36827
SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 252035 45129
ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 458551 36000
ESSAR POWER MP LTD ESSAR POWER MP LTD THERMAL-COAL 60000 243040 28600
VEDANTA LTD (P P -I) VEDANTA LTD THERMAL-GAS 3000 15044 24000
VEDANTA LTD (P P -II) VEDANTA LTD THERMAL-GAS 3000 21293 24000
PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 8234600 24000
165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 5850 64390
145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 68717 40349
SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 132655 28776
SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 144686 38567
MUNDRA UMPPCOASTAL GUJARAT POWER
LTD THERMAL-IMP COAL 400000 2530300
23900
LANCO AMARKANTAK TPP PATHADIH
U-ILANCO AMARKAN POWER LTD THERMAL-COAL 30000 195500
29200
LANCO AMARKANTAK TPP PATHADIH
U-IILANCO AMARKAN POWER LTD THERMAL-COAL 30000 206900
27600
BARADARHA TPS D B POWER LTD THERMAL-COAL 120000 677373 29200
JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 405000 28900
JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 453000 40500
DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 339437 40700
TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 293400 44000
TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 137200 37000
TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 174900 44000
BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 92900 14100
BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23700 34300
KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 27600 48300
CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2530300 23900
BHANDARDRA HEP -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 2475 54900
SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 161400 26500
SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 445000 39000
SOTHERN REGION
CENTRAL SECTOR
NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 325699 54820
NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 305532 39880
NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 998805 38510
NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 113016 54070
NEYVELI TAMILNADU POWER LTD JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 625274 42200
VALLUR TPS NTPC TECL THERMAL-COAL 150000 856438 42350
R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 1493 84300
RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1502919 29400
RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 341291 31800
SIMHADRI I NTPC LTD THERMAL-COAL 100000 688382 36800
SIMHADRI II NTPC LTD THERMAL-COAL 100000 663657 43400
KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 593110 31324
MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 291625 21764
KKNPP-1 amp 2 NPCIL NUCLEAR-NUCLEAR 200000 572609 40948
MINICOY LAKSHADEEP THERMAL-DIESEL 340 770 29600
KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1097 29600
AMINI LAKSHADEEP THERMAL-DIESEL 265 509 29600
ANDROTT LAKSHADEEP THERMAL-DIESEL 219 524 29600
KALPENI LAKSHADEEP THERMAL-DIESEL 175 356 29600
AGATTI LAKSHADEEP THERMAL-DIESEL 195 658 29600
KADMAT LAKSHADEEP THERMAL-DIESEL 190 414 29600
KILTAN LAKSHADEEP THERMAL-DIESEL 150 269 29600
CHETLET LAKSHADEEP THERMAL-DIESEL 100 139 29600
BITRA LAKSHADEEP THERMAL-DIESEL 043 024 29600
BANGARAM LAKSHADEEP THERMAL-DIESEL 018 009 29600
Page 37
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) STATE SECTOR
Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 721811 46500
Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 50000 336142 46500
RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 237358 46500
RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 239926 46500
RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 124500 46500
SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 62109 46500
UPPER SILERU APGENCO HYDRO-HYDRO 24000 33000 46500
LOWER SILERU APGENCO HYDRO-HYDRO 46000 81066 46500
DONKARAI APGENCO HYDRO-HYDRO 2500 6007 46500
PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 1262 46500
CHETTIPETA APGENCO HYDRO-HYDRO 100 214 46500
MUCHKUND APGENCO HYDRO-HYDRO 12000 37571 46500
NAGARJUNASAGAR RCPH APGENCO HYDRO-HYDRO 9000 606 46500
TUNGABHADRA HES amp HAMPI(AP
Share)
APGENCO HYDRO-HYDRO 7200 6100 46500
KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 352232 42600
KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 288131 32500
KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 319272 46500
RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 40073 44300
KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 308317 46000
KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 308963 51300
SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 61004 76600
NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 17960 75300
PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 20873 58300
POCHAMPAD-I TSPGENCO HYDRO-HYDRO 2700 5455 29800
POCHAMPAD-II TSPGENCO HYDRO-HYDRO 900 1932 40700
NIZAMSAGAR TSPGENCO HYDRO-HYDRO 1000 1126 53400
RAICHUR TPS 1 to 7 KPCL THERMAL-COAL 147000 890866 43800
RAICHUR TPS 8 KPCL THERMAL-COAL 25000 159523 48200
BELLARI TPS 1 KPCL THERMAL-COAL 50000 318679 51100
BELLARI TPS 2 KPCL THERMAL-COAL 50000 232347 55600
BELLARI TPS 3 KPCL THERMAL-COAL 70000 47565 34400
BHADRA PH KPCL HYDRO-HYDRO 3920 2369 45900
GERUSUPPA PH KPCL HYDRO-HYDRO 24000 26990 22000
GHAT PRABHA HEP KPCL HYDRO-HYDRO 3200 4777 25300
KADRA HPS KPCL HYDRO-HYDRO 15000 16889 26800
NAGJHARI KPCL HYDRO-HYDRO 90000 155159 9800
KODASALLI DPH KPCL HYDRO-HYDRO 12000 14854 19200
MUNIRA+MGH+SPH+SPH KPCL HYDRO-HYDRO 22640 48211 7900
SHARAVATHY HPS KPCL HYDRO-HYDRO 108550 276215 5400
ALMATTI DPH KPCL HYDRO-HYDRO 29000 39611 24600
VARAHI UGPH KPCL HYDRO-HYDRO 46000 71368 15600
IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 17196 15300
IDUKKI HPS KSEB HYDRO-HYDRO 78000 137905 15300
KAKKAD HPS KSEB HYDRO-HYDRO 5000 13063 15300
KALLADA HPS KSEB HYDRO-HYDRO 1500 4436 15300
KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 46544 15300
KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 635 15300
LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 30822 15300
MALANKARA HPS KSEB HYDRO-HYDRO 1050 2474 15300
MATTUPETTY KSEB HYDRO-HYDRO 200 230 15300
MALAMPUZHA KSEB HYDRO-HYDRO 250 063 15300
CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 864 15300
URUMI ST I amp II KSEB HYDRO-HYDRO 615 903 15300
LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 248 15300
NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7765 19625 15300
PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 16601 15300
PANNIAR HPS KSEB HYDRO-HYDRO 3240 6217 15300
PORINGALKUTHU KSEB HYDRO-HYDRO 3600 10052 15300
PORINGALKUTHU LBE KSEB HYDRO-HYDRO 1600 9438 15300
PEPPARA KSEB HYDRO-HYDRO 300 395 15300
POOZHITHODE KSEB HYDRO-HYDRO 480 1045 15300
Page 38
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) PEECHI KSEB HYDRO-HYDRO 125 040 15300
RANI-PERUNADU KSEB HYDRO-HYDRO 400 585 15300
SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 79783 15300
SENGULAM HPS KSEB HYDRO-HYDRO 5120 11558 15300
SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 16711 15300
VILANGAD KSEB HYDRO-HYDRO 750 1578 15300
BARAPOLE KSEB HYDRO-HYDRO 1500 1932 15300
VELLATHOOVAL KSEB HYDRO-HYDRO 360 305 15300
CHIM0NY KSEB HYDRO-HYDRO 250 156 15300
ADYANPARA KSEB HYDRO-HYDRO 350 501 15300
BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 554 15300
KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 3801 15300
KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 23132 32800
ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 14416 62280
METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 523970 62280
METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 321270 62280
NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 336575 62280
NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 591240 62280
TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 508966 62280
KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 30897 62280
VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 18720 90699 62280
KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 33593 62280
BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 1047 62280
PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 1250 62280
PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 330 62280
MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 4897 62280
MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 032 62280
KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15681 62280
KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 40608 62280
KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 21342 62280
KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 4717 62280
KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4322 62280
KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2399 62280
METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 4416 62280
METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 8035 62280
BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2187 62280
BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2359 62280
BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2511 62280
BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 1949 62280
BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 1819 62280
POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 172 62280
SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 241 62280
MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 026 62280
THIRUMOORTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 136 62280
PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 9309 62280
VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 353 62280
SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 4192 62280
PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 6571 62280
SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 1186 62280
SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6319 62280
ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 6122 62280
KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 28674 62280
SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 18381 62280
SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 4258 62280
KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 12680 62280
KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4201 62280
ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 000 62280
PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 19175 62280
AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 078 62280
BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 504 62280
BHAVANI KATTALAI (BKB)(IIIampIII BB I amp II)TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 5847 62280
PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 000 62280
Page 39
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) SRI DAMODARAM STPS APPDCL THERMAL-COAL 160000 808108 36300
PRIVATE SECTOR
KARUPPUR TANJORE LANCO TANJORE PCL THERMAL-GAS 12000 48096 28770
SIMHAPURI ENERGY LTD SIMHAPURI ENERGY LTD THERMAL-COAL 60000 143900 39100
JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 7111 45500
SBU 1 JSW ENERGY LTD
VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 26000 159100
43300
SBU 2 JSW ENERGY LTD
VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 60000 247900
42800
LANCO KPLLANCO KONDAPALLI POWER
LTDTHERMAL-GAS 36814 85060
25776
LANCO KPL STG -IILANCO KONDAPALLI POWER
LTDTHERMAL-GAS 36600 12979
46330
LANCO KPL STG -IIIALANCO KONDAPALLI POWER
LTDTHERMAL-GAS 37100 85710
46330
LANCO KPL STG -III BLANCO KONDAPALLI POWER
LTDTHERMAL-GAS 37100 43639
46330
HINDUJA NATIONAL PCL HINDUJA NATIONAL PCL THERMAL-COAL 104000 303000 38200
MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 121164 49940
UDUPI POWER COR LTD ADANI POWER LTD THERMAL-COAL 120000 754613 42500
SPECTRUM POWER GENERATION
LTD SPECTRUM PG LTD THERMAL-GASN 20525 9256812
34952
TAQA NEYVELI POWER COM PVT
LTD TAQA NEYVELI THERMAL-LIG 25000 5840
34500
ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 251000 51000
ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 207860 36800
GMR VEMAGIRI POWER GENERATION
LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 30117
46450
EASTERN REGION
CENTRAL SECTOR
MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 64675 53113
MTPS STAGE - II KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 39000 1432 69138
BOKARO `B` TPS DVC THERMAL-COAL 63000 145670 31539
MEJIA TPS U 1-3 DVC THERMAL-COAL 63000 348298 31552
MEJIA TPS U 4 DVC THERMAL-COAL 21000 116099 34997
MEJIA TPS U 5-6 DVC THERMAL-COAL 50000 276427 35976
MEJIA TPS U 7-8 DVC THERMAL-COAL 100000 552854 36991
DURGAPUR STEEL TPS DVC THERMAL-COAL 100000 665550 39323
DURGAPUR TPS DVC THERMAL-COAL 21000 59270 35416
RAGHUNATHPUR TPS DVC THERMAL-COAL 120000 201650 35326
MAITHON HYDEL STA DVC HYDRO-HYDRO 6320 12200 17984
CHANDRAPURA TPSU1-3 DVC THERMAL-COAL 42000 257610 35095
CHANDRAPURA TPSU7-8 DVC THERMAL-COAL 50000 306673 34987
KODERMA TPS DVC THERMAL-COAL 100000 380180 38131
PANCHET HPS DVC HYDRO-HYDRO 8000 13360 17984
TILLAYA HPS DVC HYDRO-HYDRO 400 1410 17984
RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34700 35400
TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 277300 23200
TLDP -III NHPC LTD HYDRO-HYDRO 13200 55400 62000
TLDP -IV NHPC LTD HYDRO-HYDRO 16000 60300 25600
FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 957219 33700
FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 308943 41000
BONGAINGAON TPS NTPC LTD THERMAL-COAL 25000 153663 58600
KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 542277 34200
KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 942591 34200
BARH-II NTPC LTD THERMAL-COAL 132000 728021 44500
TALCHER TPS NTPC LTD THERMAL-COAL 46000 335521 30100
TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 702319 25600
TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1436521 24700
STATE SECTOR
BTPS(RampM) BIHAR STATE PGCL THERMAL-COAL 22000 12142 39700
BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 98331 10602
HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 50593 9482
CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 19689 2605
RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 53192 6033
UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 147208 14637
Page 40
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 60353 4519
IB TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 288567 25000
J P H GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 210 038 61100
MEYONG CHU GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 400 1086 61100
TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 122667 38200
DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 214339 43321
KOLAGHAT THERMAL POWER
STATION
WEST BENGAL PDCL THERMAL-COAL 126000 538269 31603
BAKRESHWAR THERMAL POWER
PLANT
WEST BENGAL PDCL THERMAL-COAL 105000 634876 32154
BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 45000 166855 33299
SANTHALDIH THERMAL POWER
STATION
WEST BENGAL PDCL THERMAL-COAL 50000 336442 34932
SAGARDIGHI THERMAL POWER
PROJECT
WEST BENGAL PDCL THERMAL-COAL 160000 423121 34705
JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 20344 68900
RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 24559 68900
TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 4623 68900
PURULIA PUMPED STORAGE
PROJECT
WEST BENGAL SEDCL HYDRO-HYDRO 90000 108816 68900
MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2768 68900
PRIVATE SECTOR
CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 49474 20230
CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 555500 70200
HALDIA ENERGY HALDIA ENERGY LTD THERMAL-COAL 60000 371000 50400
DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3688 63400
KAMALANGA TPS GMR KAMALANGA ENERGY LTD THERMAL-COAL 105000547670
33300
ADHUNIK POWER U-1 ADHUNIK POWER THERMAL-COAL 27000 158 44060
ADHUNIK POWER U-2 ADHUNIK POWER THERMAL-COAL 27000 168 44250
VL-JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 332800 23622
JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 43000 45250
JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 71700 37030
JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 70700 35920
JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 71100 38870
JOJOBERA UNIT 5 TATA POWER COM LTD THERMAL-COAL 12000 79300 44560
JOJOBERA UNIT 6 TATA POWER COM LTD THERMAL-WHR 12000 83700 12840
IEL KALINGANAGAR U-I TATA POWER COM LTD THERMAL-WG 6750 33400 22500
IEL KALINGANAGAR U-II TATA POWER COM LTD THERMAL-WG 6750 34800 22500
MAITHON UNIT 1 amp 2 TATA POWER COM LTD THERMAL-COAL 105000 678000 36100
HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 27500 24340
HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 28400 24340
HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 15800 24310
NORTH EASTERN REGION
CENTRAL SECTOR
LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 74100 36600
AGARTALA GT NEEPCO THERMAL-GAS 13500 88611 27210
ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 153111 32310
DOYANG HEP NEEPCO HYDRO-HYDRO 7500 25598 49801
KOPILI HEP NEEPCO HYDRO-HYDRO 20000 98186 11491
KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 19582 20237
KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 10310 17968
RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 124093 22945
TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 10100 17344 39000
STATE SECTOR
HYDRO POWER (122 Stns) ITANAGAR GOVT OF ARUNACHAL
PRADESHHYDRO-HYDRO 6971 6217270
24600
KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39514 17337
LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 82327 36810
NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 33318 48290
MYNTRIANG SHEP ST II ASSAM POWER GENCO HYDRO-HYDRO 300 567 35776
LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 9130 49200
LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 012 49200
DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 022 49200
TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 000 49200
UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 4990 16000
UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 6476 37000
UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 16494 14600
UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 3600 9556 15000
SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 758 8000
MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44070 44800
KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 154 41400
TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 091 41400
MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 411 41400
MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 394 41400
KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 760 41400
SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 3264 41400
LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 044 41400
BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 18953 28000
ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 43585 28200
GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 4080 11100
Note
LIG Lignite N Naptha WHR Waste Heat Recovery
Page 41
File NoCEA-CH-14-1142018-Coordination Division
Coal Gas Diesel Total
State 1593400 287920 000 1881320 000 869755 68956 2820031
Private 2276083 55800 000 2331883 000 251400 1261535 3844818
Central 1258537 234406 000 1492943 162000 849622 32900 2537465
Sub Total 5128020 578126 000 5706146 162000 1970777 1363391 9202314
State 2128000 284982 000 2412982 000 544650 31119 2988751
Private 3488567 467600 000 3956167 000 48100 2005170 6009437
Central 1504295 328067 000 1832362 184000 162000 66130 2244492
Sub Total 7120862 1080649 000 8201511 184000 754750 2102418 11242679
State 1943250 79198 28788 2051236 000 1183803 52102 3287141
Private 1212450 532210 47370 1792030 000 000 3495815 5287845
Central 1422502 35958 000 1458460 332000 000 49190 1839650
Sub Total 4578202 647366 76158 5301726 332000 1183803 3597107 10414636
State 695000 10000 000 705000 000 353792 22511 1081303
Private 637500 000 000 637500 000 39900 84853 762253
Central 1387664 000 000 1387664 000 100520 1000 1489184
Sub Total 2720164 10000 000 2730164 000 494212 108364 3332740
State 000 49771 3600 53371 000 42200 25674 121245
Private 000 2450 000 2450 000 000 2571 5021
Central 52002 125360 000 177362 000 103000 500 280862
Sub Total 52002 177581 3600 233183 000 145200 28745 407128
State 000 000 4005 4005 000 000 525 4530
Private 000 000 000 000 000 000 221 221
Central 000 000 000 000 000 000 510 510
Sub Total 000 000 4005 4005 000 000 1256 5261
State 6359650 711871 36393 7107913 000 2994200 200887 10303000
Private 7614600 1058060 47370 8720030 000 339400 6850164 15909594
Central 5625000 723791 000 6348791 678000 1215142 150230 8392163
Total 19599250 2493722 83763 22176734 678000 4548742 7201281 34604757
Figures at decimal may not tally due to rounding off
Note -
(As per latest information available with MNRE)
Break up of RES all India as on 30092018 is given below (in MW)
450695 3461510 2402166 7201281
A Oct 2018 669755 MW
B Capacity Retired
during
Oct 2018 705 MW
C Oct 2018 0 MW
D Oct 2018 A-B+C -35245 MW
Share of Telangana from JEGURUPADU CCPP Ph II has been removed and the same has been added to private sector of Andhra Pradesh due to expiry of PPA as per
request from TS Transco
Region
ALL INDIA INSTALLED CAPACITY (IN MW) OF POWER STATIONS (As on 31102018)
(UTILITIES)
Net Capacity Added during
1 RES include SHP BP UampI Solar and Wind Energy Installed capacity in respect of RES (MNRE) as on 30092018
Small
Hydro PowerWind Power
Bio-PowerSolar Power
Total
CapacityBM PowerCogen Waste to Energy
2 U-1 to 7 (76995=69755 MW) of LAKWA REPLACEMENT POWER PROJECT commissioned in April 2018 but intimated in October 2018
has been added to state sector of Assam
1 Badarpur TPS (705 MW) has been retired from central sector of Northern Region
Capacity Up-rated
Ownership Sector
873080 13830
Capacity Added during
1 U-2 (600 MW) of MAHAN TPP has been commissioned and added to private sector of Madhya Pradesh
Grand TotalThermalNuclear Hydro
Islands
ALL INDIA
Abbreviation- SHP=Small Hydro Project (le 25 MW) BP=Biomass Power UampI=Urban amp Industrial Waste Power RES=Renewable Energy Sources
Northern Region
Western Region
Southern Region
Eastern Region
North Eastern
Region
RES
(MNRE)
Modewise breakup
File NoCEA-CH-14-1142018-Coordination Division
Coal Gas Diesel Total
State 13500 180040 000 193540 000 000 000 193540
Private 86922 10800 000 97722 000 000 12157 109879
Central 311272 20701 000 331973 10283 72309 000 414565
Sub-Total 411694 211541 000 623235 10283 72309 12157 717984
State 272000 15000 000 287000 000 110282 5930 403212
Private 408078 000 000 408078 000 20000 34745 462823
Central 129472 53561 000 183034 10094 66370181 500 259998
Sub-Total 809550 68561 000 878112 10094 196652 41175 1126032
State 000 000 000 000 000 69460 25661 95121
Private 000 000 000 000 000 99200 60536 159736
Central 18340 6201 000 24541 2895 122388 000 149824
Sub-Total 18340 6201 000 24541 2895 291048 86197 404681
State 000 17500 000 17500 000 123000 12903 153403
Private 000 000 000 000 000 000 5985 5985
Central 50639 12907 000 63547 6798 109188 000 179533
Sub-Total 50639 30407 000 81047 6798 232188 18888 338921
State 176000 15000 000 191000 000 259770 12780 463550
Private 511550 000 000 511550 000 28800 115462 655812
Central 85458 26401 000 111859 19681 92342 000 223882
Sub-Total 773008 41401 000 814409 19681 380912 128242 1343244
State 585000 60380 000 645380 000 109618 2385 757383
Private 388200 000 000 388200 000 10400 710680 1109280
Central 120625 22110 000 142735 55674 73901 29400 301710
Sub-Total 1093825 82490 000 1176315 55674 193919 742465 2168373
State 546900 000 000 546900 000 72410 2510 621820
Private 871433 000 000 871433 000 84200 266691 1222324
Central 379639 54949 000 434588 28948 180253 3000 646789
Sub-Total 1797972 54949 000 1852921 28948 336863 272201 2490933
State 000 000 000 000 000 125215 6787 132002
Private 9900 45000 000 54900 000 8800 52244 115944
Central 34324 6966 000 41290 3124 47554 000 91968
Sub-Total 44224 51966 000 96190 3124 181569 59031 339914
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 3035 3035
Central 3815 1503 000 5317 801 10171 000 16289
Sub-Total 3815 1503 000 5317 801 10171 3035 19324
124953 29105 000 154058 23703 75145 000 252907
State 1593400 287920 000 1881320 000 869755 68956 2820031
Private 2276083 55800 000 2331883 000 251400 1261535 3844818
Central 1258537 234406 000 1492943 162000 849622 32900 2537465
Grand Total 5128020 578126 000 5706146 162000 1970777 1363391 9202314
Uttar Pradesh
Uttarakhand
Chandigarh
Grand TotalThermalNuclear
Hydro
(Renewable)
RES
(MNRE)
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
NORTHERN REGION
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
(As on 31102018)
Central - Unallocated
Total (Northern
Region)
Delhi
Haryana
Himachal Pradesh
Jammu amp Kashmir
Punjab
Rajasthan
State Ownership Sector
Modewise breakup
File NoCEA-CH-14-1142018-Coordination Division
(As on 31102018)
Coal Gas Diesel Total
State 000 000 000 000 000 000 005 005
Private 000 4800 000 4800 000 000 091 4891
Central 45478 1967 000 47445 2600 000 000 50045
Sub-Total 45478 6767 000 52245 2600 000 096 54941
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 1301 1301
Central 12663 4334 000 16997 700 000 000 17697
Sub-Total 12663 4334 000 16997 700 000 1301 18998
State 475000 217782 000 692782 000 77200 800 770782
Private 776567 396000 000 1172567 000 000 729782 1902349
Central 309051 42400 000 351451 55900 000 23830 431181
Sub-Total 1560618 656182 000 2216800 55900 77200 754412 3104312
State 408000 000 000 408000 000 170366 8396 586762
Private 617400 10000 000 627400 000 000 378205 1005605
Central 279441 25700 000 305141 27300 152000 30000 514441
Sub-Total 1304841 35700 000 1340541 27300 322366 416601 2106808
State 228000 000 000 228000 000 12000 1105 241105
Private 849000 000 000 849000 000 000 52430 901430
Central 195344 000 000 195344 4800 10000 000 210144
Sub-Total 1272344 000 000 1272344 4800 22000 53535 1352679
State 1017000 67200 000 1084200 000 285084 20813 1390097
Private 1245600 56800 000 1302400 000 48100 842815 2193315
Central 433475 227273 000 660748 69000 000 12300 742048
Sub-Total 2696075 351273 000 3047348 69000 333184 875927 4325459
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 546 546
Central 17444 6634 000 24078 900 000 000 24978
Sub-Total 17444 6634 000 24078 900 000 546 25524
211400 19759 000 231159 22800 000 000 253959
State 2128000 284982 000 2412982 000 544650 31119 2988751
Private 3488567 467600 000 3956167 000 48100 2005170 6009437
Central 1504295 328067 000 1832362 184000 162000 66130 2244492
Grand Total 7120862 1080649 000 8201511 184000 754750 2102418 11242679
Central - Unallocated
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
WESTERN REGION
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
State Ownership Sector
Modewise breakup
Grand TotalThermalNuclear
Hydro
(Renewable)
RES
(MNRE)
Total (Western
Region)
Goa
Daman amp Diu
Gujarat
Madhya Pradesh
Chhattisgarh
Maharashtra
Dadra amp Nagar
Naveli
File NoCEA-CH-14-1142018-Coordination Division
(As on 31102018)
Coal Gas Diesel Total
State 501000 23540 000 524540 000 167360 4875 696775
Private 387388 381318 3680 772386 000 000 693073 1465459
Central 167456 000 000 167456 12727 000 25000 205183
Sub-Total 1055844 404858 3680 1464382 12727 167360 722948 2367417
State 508250 000 000 508250 000 247993 4022 760265
Private 83945 83182 000 167127 000 000 375048 542175
Central 195612 000 000 195612 14873 000 1000 211485
Sub-Total 787807 83182 000 870989 14873 247993 380070 1513925
State 502000 000 12792 514792 000 359980 15533 890305
Private 195850 000 2520 198370 000 000 1275640 1474010
Central 282920 000 000 282920 69800 000 000 352720
Sub-Total 980770 000 15312 996082 69800 359980 1291173 2717035
State 000 000 15996 15996 000 188150 15402 219548
Private 61500 17400 000 78900 000 000 20899 99799
Central 114322 35958 000 150280 36200 000 5000 191480
Sub-Total 175822 53358 15996 245176 36200 188150 41301 510827
State 432000 52408 000 484408 000 220320 12270 716998
Private 483767 50310 41170 575247 000 000 1130984 1706231
Central 448952 000 000 448952 144800 000 18190 611942
Sub-Total 1364719 102718 41170 1508607 144800 220320 1161444 3035171
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 000 000
Central 10000 000 000 10000 000 000 000 10000
Sub-Total 10000 000 000 10000 000 000 000 10000
State 000 3250 000 3250 000 000 000 3250
Private 000 000 000 000 000 000 171 171
Central 24840 000 000 24840 8600 000 000 33440
Sub-Total 24840 3250 000 28090 8600 000 171 36861
178400 000 000 178400 45000 000 000 223400
State 1943250 79198 28788 2051236 000 1183803 52102 3287141
Private 1212450 532210 47370 1792030 000 000 3495815 5287845
Central 1422502 35958 000 1458460 332000 000 49190 1839650
Grand Total 4578202 647366 76158 5301726 332000 1183803 3597107 10414636
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
SOUTHERN REGION
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
State Ownership Sector
Modewise breakup
Grand TotalThermal RES
(MNRE)Nuclear
Hydro
(Renewable)
Kerala
Tamil Nadu
NLC
Puducherry
Central - Unallocated
Total (Southern
Region)
Andhra Pradesh
Telangana
Karnataka
File NoCEA-CH-14-1142018-Coordination Division
(As on 31102018)
Coal Gas Diesel Total
State 71000 000 000 71000 000 000 7070 78070
Private 28100 000 000 28100 000 000 25545 53645
Central 291433 000 000 291433 000 11000 000 302432
Sub-Total 390533 000 000 390533 000 11000 32615 434147
State 42000 000 000 42000 000 13000 405 55405
Private 73000 000 000 73000 000 000 3207 76207
Central 39374 000 000 39374 000 6100 000 45474
Sub-Total 154374 000 000 154374 000 19100 3612 177086
State 540000 10000 000 550000 000 98600 9195 657795
Private 242500 000 000 242500 000 000 34452 276952
Central 76077 000 000 76077 000 41000 000 117077
Sub-Total 858577 10000 000 868577 000 139600 43647 1051824
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 000 000
Central 698504 000 000 698504 000 18620 000 717124
Sub-Total 698504 000 000 698504 000 18620 000 717124
State 42000 000 000 42000 000 206192 630 248822
Private 293900 000 000 293900 000 000 21648 315548
Central 163390 000 000 163390 000 8900 1000 173290
Sub-Total 499290 000 000 499290 000 215092 23278 737660
State 000 000 000 000 000 36000 5211 41211
Private 000 000 000 000 000 39900 001 39901
Central 8703 000 000 8703 000 6400 000 15103
Sub-Total 8703 000 000 8703 000 82300 5212 96215
110183 000 000 110183 000 8501 000 118684
State 695000 10000 000 705000 000 353792 22511 1081303
Private 637500 000 000 637500 000 39900 84853 762253
Central 1387664 000 000 1387664 000 100520 1000 1489184
Grand Total 2720164 10000 000 2730164 000 494212 108364 3332740
(As on 31102018)
Coal Gas Diesel Total
State 000 32821 000 32821 000 10000 3001 45822
Private 000 2450 000 2450 000 000 1680 4130
Central 27902 43556 000 71458 000 36851 000 108309
Sub-Total 27902 78827 000 106729 000 46851 4681 158261
State 000 000 000 000 000 000 10710 10710
Private 000 000 000 000 000 000 539 539
Central 2470 4682 000 7152 000 11800 000 18952
Sub-Total 2470 4682 000 7152 000 11800 11249 30201
State 000 000 000 000 000 32200 3103 35303
Private 000 000 000 000 000 000 006 006
Central 3040 10969 000 14009 000 7446 000 21455
Sub-Total 3040 10969 000 14009 000 39646 3109 56764
State 000 16950 000 16950 000 000 1601 18551
Private 000 000 000 000 000 000 009 009
Central 3740 43695 000 47435 000 7077 500 55012
Sub-Total 3740 60645 000 64385 000 7077 2110 73572
State 000 000 3600 3600 000 000 545 4145
Private 000 000 000 000 000 000 217 217
Central 3140 7157 000 10297 000 9677 000 19974
Sub-Total 3140 7157 3600 13897 000 9677 762 24336
State 000 000 000 000 000 000 3067 3067
Private 000 000 000 000 000 000 100 100
Central 2140 4893 000 7033 000 5860 000 12893
Sub-Total 2140 4893 000 7033 000 5860 3167 16060
State 000 000 000 000 000 000 3647 3647
Private 000 000 000 000 000 000 020 020
Central 2070 4046 000 6116 000 9913 000 16029
Sub-Total 2070 4046 000 6116 000 9913 3667 19696
7500 6362 000 13862 000 14376 000 28238
State 000 49771 3600 53371 000 42200 25674 121245
Private 000 2450 000 2450 000 000 2571 5021
Central 52002 125360 000 177362 000 103000 500 280862
Grand Total 52002 177581 3600 233183 000 145200 28745 407128
Central - Unallocated
Total (Eastern
Region)
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
NORTH-EASTERN REGION
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
State Ownership Sector
Modewise breakup
Grand TotalThermalNuclear
Bihar
Jharkhand
West Bengal
DVC
Odisha
Sikkim
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
EASTERN REGION
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
Ownership Sector
Modewise breakup
Grand TotalThermalNuclear
Hydro
(Renewable)
RES
(MNRE)
Manipur
Nagaland
State
Mizoram
Central - Unallocated
Total (North-
Eastern Region)
Hydro
(Renewable)
RES
(MNRE)
Assam
Arunachal Pradesh
Meghalaya
Tripura
File NoCEA-CH-14-1142018-Coordination Division
(As on 31102018)
Coal Gas Diesel Total
State 000 000 4005 4005 000 000 525 4530
Private 000 000 000 000 000 000 146 146
Central 000 000 000 000 000 000 510 510
Sub-Total 000 000 4005 4005 000 000 1181 5186
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 075 075
Central 000 000 000 000 000 000 000 000
Sub-Total 000 000 000 000 000 000 075 075
State 000 000 4005 4005 000 000 525 4530
Private 000 000 000 000 000 000 221 221
Central 000 000 000 000 000 000 510 510
Grand Total 000 000 4005 4005 000 000 1256 5261
19
Andaman amp
Nicobar
lakshadweep
Total (Islands)
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
State Ownership Sector
Modewise breakup
Grand TotalThermalNuclear
Hydro
(Renewable)
RES
(MNRE)
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
ISLANDS
File NoCEA-CH-14-1142018-Coordination Division
SrNo Contents Page
1 Executive summary of Target and Achievement of Transmission Lines during 2018-19
20(1)
2 List of Transmission Lines CommissionedReady for commissioning during Oct-2018 20(2)
Section C - Transmission Lines
File NoCEA-CH-14-1142018-Coordination Division
Executive summary of Target and Achievement of Transmission Lines during 2018-19 As on Oct-18
(All figures in circuit kms)
Centr
al S
ecto
r
Sta
te S
ecto
r
JV
Private
Secto
r
To
tal
Centr
al S
ecto
r
Sta
te S
ecto
r
JV
Private
Secto
r
To
tal
Centr
al S
ecto
r
Sta
te S
ecto
r
JV
Private
Secto
r
To
tal
Centr
al S
ecto
r
Sta
te S
ecto
r
JV
Private
Secto
r
To
tal
Centr
al S
ecto
r
Sta
te S
ecto
r
JV
Private
Secto
r
To
tal
Cen
tral S
ecto
r
Sta
te S
ecto
r
JV
Pri
vate
Secto
r
Gra
nd
To
tal
0 0 0 0 0 0 0 0 4692 766 827 6285 3045 5906 980 9931 553 5878 0 6431 8290 12550 1807 22647
Oct18 Programme 0 0 0 0 0 0 0 0 300 0 0 300 662 90 562 1314 0 723 0 723 962 813 562 2337
Achievement 0 0 0 0 0 0 0 0 729 0 0 729 471 266 0 737 0 401 0 401 1200 667 0 1867
Upto Oct-18 Programme 0 0 0 0 0 0 0 0 3004 416 0 3420 1350 3109 562 5021 481 4346 0 4827 4835 7871 562 13268
Achievement 0 0 0 0 0 0 0 0 2286 0 178 2464 1436 1783 1595 4814 60 4461 0 4521 3782 6244 1773 11799
20(1)
220 kV Grand Total 800 kV 500 kV
Programme 2018-19
Programme
Achievement
HVDC765 kV 400 kV
File NoCEA-CH-14-1142018-Coordination Division
SlNo Line
Length
(cKM)
1 2 3 4 5 6
1 765 Jharsuguda - Dharamjaygarh line DC PGCIL 296
2 765LILO of Kurnool - Thirvualam line at
CuddapahDC PGCIL 190
3 765 Salem PS - Madhugiri PS line SC PGCIL 243
4 400 Cuddapah - Hindupur line (Q) DC PGCIL 338
5 400LILO of Both Ckt of Bamnauli - Samaypur at
TughlakabadMC PGCIL 114
6 400LILO-Out of Cuddapah - Hindupur line (Q)
(Both Ckts) at NP Kunta ssDC PGCIL 19
1200
7 400LILO of Sterlite - Meramundali at Lapanga
4oo kV ssDC OPTCL 14
8 400 Sterlite - Lapanga line DC OPTCL 37
9 400 TMDC Podili - Sattapenalli line DC APTRANSCO 215
10 230Neyveli 230110 kV ss - Eachangadu
230kV FeederSC TANTRANSCO 1
11 230 NNTPS - Neyveli 230110kV ss DC TANTRANSCO 2
12 220 Ajmer (400 kV) - Bherunda (TK) DC RVPNL 100
13 220 Aligarh - Atrauli line DC UPPTCL 77
14 220 Khandwa - Chhanera line DC MPPTCL 78
15 220LILO of one Ckt of Hadala - Sartanpar line
at Wankaner on MC towersDC GETCO 6
16 220 LILO of one Ckt of Vita - Miraj at Alkud ss DC MSETCL 27
17 220 Mendhigiri - Alkud ss DC MSETCL 110
667
1867
20(2)
Grand Total
2Transmission Lines (220 kV and above) CommissionedReady for commissioning During Oct-2018
As on 31-10-18
Voltage
Level (kV)Name of Transmission Lines
Circuit
Type
Executing
Agency
CENTRAL SECTOR
Total of CENTRAL SECTOR
STATE SECTOR Sector
Total of STATE SECTOR
File NoCEA-CH-14-1142018-Coordination Division
SN Contents Page
1 Executive summary of Target and Achievement of Substations during 2018-19 21(1)
2Sub Stations (220 kV and above) commissionedready for commisssioning during Oct-
201821(2)
Section D - Sub Stations
File NoCEA-CH-14-1142018-Coordination Division
1 Executive summary of Target and Achievement of Substations during 2018-19 As on Oct-18
(All figures in circuit MVA)
Centr
al S
ecto
r
Sta
te S
ecto
r
JV
Private
Secto
r
To
tal
Centr
al S
ecto
r
Sta
te S
ecto
r
JV
Private
Secto
r
To
tal
Centr
al S
ecto
r
Sta
te S
ecto
r
JV
Private
Secto
r
To
tal
Centr
al S
ecto
r
Sta
te S
ecto
r
JV
Private
Secto
r
To
tal
Centr
al S
ecto
r
Sta
te S
ecto
r
JV
Private
Secto
r
To
tal
Cen
tral S
ecto
r
Sta
te S
ecto
r
JV
Pri
vate
Secto
r
Gra
nd
To
tal
3000 0 0 3000 0 0 0 0 22200 0 0 22200 8185 13085 630 21900 740 14760 0 15500 34125 27845 630 62600
Oct18 Programme 0 0 0 0 0 0 0 0 0 0 0 0 1000 1260 630 2890 0 1400 0 1400 1000 2660 630 4290
Achievement 0 0 0 0 0 0 0 0 3000 0 0 3000 1500 3120 0 4620 0 2220 0 2220 4500 5340 0 9840
Upto Oct-18 Programme 0 0 0 0 0 0 0 0 10000 0 0 10000 6130 7435 630 14195 0 9670 0 9670 16130 17105 630 33865
Achievement 0 0 0 0 0 0 0 0 14000 0 0 14000 9000 7550 630 17180 0 10610 0 10610 23000 18160 630 41790
21(1)
220 kV Grand Total 800 kV 500 kV
Programme 2018-19
Programme
Achievement
HVDC765 kV 400 kV
File NoCEA-CH-14-1142018-Coordination Division
As on 31-10-18
Sl Voltage Ratio Capacity
No (kVkV) (MWMVA)
1 2 3 4 5
1 Cuddapah Ss 765400 PGCIL 3000
2 Tughlakabad SS (GIS) 400220 PGCIL 1500
Total of CENTRAL SECTOR 4500
3 Panki Kanpur (Aug) TF-I 400200 UPPTCL 75
4 Hindupur ss (1st ICT) 400220 APTRANSCO 315
5 Thappagundu ss 400110 TANTRANSCO 600
6 Mendhasal (2nd power TF) 400220 OPTCL 20
7 Jodhpur ss (New) 400220 RVPNL 315
8 Shankarpally 400220 TSTRANSCO 500
9 Podili ss (1st ICT) 400220 APTRANSCO 315
10 Doni (Gadag)SS 400220 KPTCL 1000
11 Porur (Addl TF) 230110 TANTRANSCO 100
12 Anuppankulam (Addl TF) 230110 TANTRANSCO 60
13 Neyveli SS 230110 TANTRANSCO 480
14 Savarkundla (Aug) 22066 GETCO 60
15 Bhuna (Aug) 220132 HVPNL 100
16 Madanpur (Aug) 22066 HVPNL 100
17 Gurgaon Sec-52A (Aug) 22066 HVPNL 160
18 IA Hisar (Aug) 220132 HVPNL 50
19 Narwana (Aug) 220132 HVPNL 60
20 Therubali (3rd Auto TF) 220132 OPTCL 160
21 Halasar ss 220132 RVPNL 160
22 Bansi Siddaharthnagar (Aug) TF-I 220132 UPPTCL 60
23 Hata Kushinagar (New) TF-I 220132 UPPTCL 100
24 Gomti nagar Lucknow (Aug) TF-IV 22033 UPPTCL 60
25 Kanpur Road Lucknow (New) TF-III 22033 UPPTCL 60
26 Asoj (Aug) 22066 GETCO 150
27 Kangasiyali (Aug) 22066 GETCO 60
28 Karmsad (Aug) 22066 GETCO 160
29 Lalpar (Aug) 22066 GETCO 60
TOTAL STATE SECTOR 5340
GRAND TOTAL 9840
21(2)
PRIVATE SECTOR
CENTRAL SECTOR
STATE SECTOR
2Sub-Stations (220 kV and above) CommissionedReady for commissioning During Oct-2018
Name of Sub StationsExecuting
Agency
File NoCEA-CH-14-1142018-Coordination Division
SN Contents Page
1 Electricity Generation (MU) Targets and Achievements for 2018-19 22
Section E - Electricity Generation
File NoCEA-CH-14-1142018-Coordination Division
Programme Achievement Ach Programme Achievement Ach
Central Sector 35160700 3028100 3162321 10443 20144400 21150469 10499
State Sector 35132000 3010000 3017260 10024 19922100 19549030 9813
PvtIPP Sector 36999700 3240600 3375603 10417 21598300 20794155 9628
PvtUTL Sector 1857600 164500 180597 10979 1130900 1203107 10638
Total 109150000 9443200 9735781 10310 62795700 62696761 9984
Central Sector 5617600 420900 451004 10715 4193000 4045436 9648
State Sector 6110600 559500 708469 12663 4049400 4433000 10947
PvtIPP Sector 1141800 80500 90122 11195 976400 1021963 10467
PvtUTL Sector 130000 11300 12564 11119 76700 99943 13030
Total 13000000 1072200 1262159 11772 9295500 9600342 10328
Central Sector 3850000 353300 303310 8585 2068900 2203540 10651
Total 3850000 353300 303310 8585 2068900 2203540 10651
Bhutan Import 500000 63300 35395 5592 347000 416660 12007
Central Sector 44628300 3802300 3916635 10301 26406300 27399445 10376
State Sector 41242600 3569500 3725729 10438 23971500 23982030 10004
Pvt Sector 40129100 3496900 3658886 10463 23782300 23119168 9721
Total 126500000 10932000 11336645 10370 74507100 74917303 10055
Provisional based on actual-cum-Assesment
Figs in MU
Cummulative
Achievement
Cummulative
Achievement
Sep-18 Sep-17 Upto Sep-2018 Upto Sep-2017
1073794 748889 7332680 5660929
22
Renewable Energy Generation
Achievement
Oct-2018
1 Electricity Generation (MU) Targets and Achievememts for 2018-19
All India Energy Generation During April 2018- Oct 2018 (MU)
Target (2018-19)April 2018- Oct 2018
Sector
Hydro
Thermal
Nuclear
627957
92955
20689
745071
626968
96003
22035
749173
0
100000
200000
300000
400000
500000
600000
700000
800000
Thermal Hydro Nuclear Total
Programme
Achievement
File NoCEA-CH-14-1142018-Coordination Division
SN Contents Page
1 Energy Power Supply Position (Provisional) for Oct-2018 and during April 2018- Oct 2018 23
2 Peak Power Supply Position (Provisional) for Oct-2018 and during April 2018- Oct 2018 24
3 Energy Power Supply Position (Revised) for Sep-2018 and during April 2018- Sept 2018 25
4 Peak Power Supply Position (Revised) for Sep-2018 and during April 2018- Sept 2018 26
5 Notified Power cuts Restrictions on Industries during Oct-2018 27
6 Power Supply to Agricultural Sector during Oct-2018 28
Section F - Power supply position
File NoCEA-CH-14-1142018-Coordination Division
आकड़ मममलयन यननट नट Figures in MU net
ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied
कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )
चडीगढ़ Chandigarh 108 108 0 00 1055 1055 0 00
दिलली Delhi 2490 2489 1 00 22524 22510 14 01
हरियजणज Haryana 4554 4554 0 00 35205 35205 0 00
दहमजचल परिश Himachal Pradesh 788 787 2 02 5728 5560 168 29
रमम कशमीि Jammu amp Kashmir 1497 1219 278 186 10982 8865 2117 193
परजब Punjab 4418 4418 0 00 38832 38819 13 00
िजरसथजन Rajasthan 6748 6748 0 00 45341 45181 160 04
उतति परिश Uttar Pradesh 10136 9973 164 16 75485 74808 676 09
उततिजखड Uttarakhand 1083 1081 3 03 8395 8310 85 10
उततरी कषतर Northern Region 31822 31375 447 14 243547 240314 3233 13
छततीसगढ़ Chhattisgarh 2454 2453 1 00 16119 16091 28 02
गरिजत Gujarat 11636 11636 0 00 70782 70768 14 00
मधय परिश Madhya Pradesh 5860 5859 1 00 38412 38410 2 00
महजिजषटर Maharashtra 15223 15095 128 08 95489 95355 134 01
िमन औि दिउ Daman amp Diu 216 216 0 00 1523 1523 0 00
िजिि व नगि हवली Dadra amp Nagar Haveli 553 553 0 00 3757 3757 0 00
गोवज Goa 366 366 0 00 2497 2495 2 01
पशचिमी कषतर Western Region 36308 36178 130 04 228579 228398 180 01
आनधर परिश Andhra Pradesh 5860 5854 6 01 37377 37334 43 01
तलगजनज Telangana 6748 6742 6 01 38251 38205 46 01
कनजाटक Karnataka 5842 5835 7 01 39111 39059 52 01
किल Kerala 2116 2096 20 09 14256 14160 96 07
तममल नजड Tamil Nadu 8611 8601 10 01 65742 65666 76 01
पडचिी Puducherry 216 215 1 05 1654 1646 8 05
लकष-दवीप Lakshadweep 4 4 0 0 27 27 0 0
दकषकषणी कषतर Southern Region 29392 29342 50 02 196390 196069 321 02
बबहजि Bihar 2742 2738 4 01 19143 18951 192 10
िजमोिि घजटी ननगम DVC 1712 1698 13 08 13096 12828 268 20
झजिखणड Jharkhand 701 697 4 06 5022 4949 73 15
ओडडशज Odisha 3147 3134 13 04 20224 20192 32 02
पशशचम बगजल West Bengal 4204 4200 4 01 33008 32881 127 04
मसशककम Sikkim 40 40 0 00 279 279 0 01
अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 67 202 188 13 67
परवी कषतर Eastern Region 12547 12507 40 03 90772 90080 692 08
अरणजचल परिश Arunachal Pradesh 67 66 1 09 502 496 7 13
असम Assam 833 809 24 29 6153 5903 250 41
मणणपि Manipur 72 71 1 10 485 478 7 14
मघजलय Meghalaya 147 147 0 00 1043 1042 0 00
ममज़ोिम Mizoram 63 62 1 08 365 359 5 14
नजगजलड Nagaland 76 67 8 110 540 481 59 109
बिपिज Tripura 130 129 1 09 1025 1007 19 18
उततर-परवी कषतर North-Eastern Region 1387 1351 35 25 10113 9766 346 34
समपणण भारत All India 111455 110753 702 06 769399 764627 4773 06
23
ऊराण वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Energy Power Supply Position Report (Provisional)
राजयStateअकरबर2018 October2018 अपरल2018 -अकरबर2018 April2018 to October2018
ऊरजा पनत ा म कमी ऊरजा पनत ा म कमीEnergy not Supplied
Excludes energy exported to Bangladesh
Energy not Supplied
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
File NoCEA-CH-14-1142018-Coordination Division
अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met
कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )
चडीगढ़ Chandigarh 217 217 0 00 369 369 0 00
दिलली Delhi 4713 4713 0 00 7016 7016 0 00
हरियजणज Haryana 7948 7948 0 00 10270 10270 0 00
दहमजचल परिश Himachal Pradesh 1520 1520 0 00 1520 1520 0 00
रमम कशमीि Jammu amp Kashmir 2836 2269 567 200 2951 2361 590 200
परजब Punjab 7979 7979 0 00 12638 12638 0 00
िजरसथजन Rajasthan 11450 11450 0 00 11698 11698 0 00
उतति परिश Uttar Pradesh 17434 16745 688 39 20498 20062 436 21
उततिजखड Uttarakhand 1943 1943 0 00 2143 2143 0 00
उततरी कषतर Northern Region 50659 49635 1024 20 63166 61726 1440 23
छततीसगढ़ Chhattisgarh 4414 4268 146 33 4414 4268 146 33
गरिजत Gujarat 18148 18130 19 01 18148 18130 19 01
मधय परिश Madhya Pradesh 11356 11317 39 03 11356 11317 39 03
महजिजषटर Maharashtra 23864 23159 705 30 23864 23254 610 26
िमन औि दिउ Daman amp Diu 342 341 1 02 357 356 1 02
िजिि व नगि हवली Dadra amp Nagar Haveli 784 780 4 05 816 815 1 01
गोवज Goa 536 536 0 00 596 596 0 00
पशचिमी कषतर Western Region 56548 55695 853 15 56548 55695 853 15
आनधर परिश Andhra Pradesh 9435 9435 0 00 9435 9435 0 00
तलगजनज Telangana 10603 10603 0 00 10815 10815 0 00
कनजाटक Karnataka 10741 10741 0 00 10741 10741 0 00
किल Kerala 3727 3644 83 22 4050 3997 53 13
तममल नजड Tamil Nadu 14747 14333 414 28 15029 14981 47 03
पडचिी Puducherry 363 362 1 03 420 400 19 46
लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0
दकषकषणी कषतर Southern Region 45279 45226 53 01 45946 45684 262 06
बबहजि Bihar 4945 4945 0 00 5050 5045 5 01
िजमोिि घजटी ननगम DVC 2729 2729 0 00 2874 2874 0 00
झजिखणड Jharkhand 1260 1260 0 00 1339 1284 55 41
ओडडशज Odisha 5624 5224 400 71 5624 5357 268 48
पशशचम बगजल West Bengal 8775 8775 0 00 9130 9123 7 01
मसशककम Sikkim 86 86 0 00 90 90 0 00
अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7
परवी कषतर Eastern Region 22959 22567 392 17 22959 22567 392 17
अरणजचल परिश Arunachal Pradesh 138 125 13 94 138 133 5 37
असम Assam 1785 1704 81 45 1865 1809 56 30
मणणपि Manipur 187 185 2 11 193 186 7 36
मघजलय Meghalaya 336 336 0 00 371 368 2 07
ममज़ोिम Mizoram 99 97 2 20 103 98 4 41
नजगजलड Nagaland 134 131 3 22 156 138 18 117
बिपिज Tripura 269 269 0 00 298 293 5 17
उततर-परवी कषतर North-Eastern Region 2790 2700 90 32 2967 2850 117 39
समपणण भारत All India 172945 170604 2341 14 177022 175528 1494 08
24
अधिकतम वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Peak Power Supply Position Report (Provisional)
आकड़ मगज वजट नट Figures in MW netअपरल2018 -अकरबर2018 April2018 to October2018
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
मजग की पनता म कमी Demand not Met
Excludes the supply to Bangladesh
राजयStateअकरबर2018 October2018
मजग की पनता म कमी Demand not Met
File NoCEA-CH-14-1142018-Coordination Division
आकड़ मममलयन यननट नट Figures in MU net
ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied
कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )
चडीगढ़ Chandigarh 141 141 0 00 947 947 0 00
दिलली Delhi 2925 2924 1 00 20034 20021 13 01
हरियजणज Haryana 4794 4794 0 00 30651 30651 0 00
दहमजचल परिश Himachal Pradesh 876 853 24 27 4940 4773 167 34
रमम कशमीि Jammu amp Kashmir 1520 1246 274 180 9485 7646 1839 194
परजब Punjab 5575 5575 0 00 34414 34401 13 00
िजरसथजन Rajasthan 6202 6201 0 00 38594 38434 160 04
उतति परिश Uttar Pradesh 10211 10124 86 08 65349 64836 513 08
उततिजखड Uttarakhand 1162 1149 13 11 7311 7229 82 11
उततरी कषतर Northern Region 33405 33008 398 12 211725 208939 2786 13
छततीसगढ़ Chhattisgarh 2403 2388 15 06 13665 13638 27 02
गरिजत Gujarat 10122 10122 0 00 59146 59132 14 00
मधय परिश Madhya Pradesh 5492 5491 1 00 32552 32551 1 00
महजिजषटर Maharashtra 13615 13612 3 00 80266 80260 6 00
िमन औि दिउ Daman amp Diu 221 221 0 00 1306 1306 0 00
िजिि व नगि हवली Dadra amp Nagar Haveli 551 551 0 00 3204 3204 0 00
गोवज Goa 339 339 0 00 2131 2128 2 01
पशचिमी कषतर Western Region 32742 32723 19 01 192270 192220 50 00
आनधर परिश Andhra Pradesh 5294 5287 7 01 31518 31480 37 01
तलगजनज Telangana 6279 6272 8 01 31503 31463 40 01
कनजाटक Karnataka 5701 5693 8 01 33269 33225 45 01
किल Kerala 2050 2026 24 12 12140 12063 76 06
तममल नजड Tamil Nadu 8971 8959 12 01 57131 57065 66 01
पडचिी Puducherry 226 224 2 08 1438 1431 7 05
लकष-दवीप Lakshadweep 4 4 0 0 23 23 0 0
दकषकषणी कषतर Southern Region 28520 28460 60 02 166998 166727 271 02
बबहजि Bihar 2839 2793 46 16 16400 16213 188 11
िजमोिि घजटी ननगम DVC 1901 1750 151 79 11384 11130 254 22
झजिखणड Jharkhand 740 723 17 22 4321 4252 69 16
ओडडशज Odisha 2921 2918 3 01 17077 17058 19 01
पशशचम बगजल West Bengal 4902 4879 23 05 28804 28681 123 04
मसशककम Sikkim 39 39 0 01 239 239 0 01
अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 67 173 162 12 67
परवी कषतर Eastern Region 13341 13102 240 18 78225 77573 652 08
अरणजचल परिश Arunachal Pradesh 74 73 1 10 435 429 6 14
असम Assam 950 914 36 38 5320 5094 226 43
मणणपि Manipur 70 69 1 11 414 408 6 15
मघजलय Meghalaya 150 150 0 01 896 896 0 01
ममज़ोिम Mizoram 58 57 1 12 302 297 5 16
नजगजलड Nagaland 80 72 8 104 464 414 50 108
बिपिज Tripura 192 191 1 07 895 878 17 19
उततर-परवी कषतर North-Eastern Region 1575 1527 48 31 8726 8415 311 36
समपणण भारत All India 109584 108819 765 07 657944 653873 4071 06
Energy not Supplied Energy not Supplied
ससतबर2018 September2018 अपरल2018 -ससतबर2018 April2018 to September2018
ऊरजा पनत ा म कमी ऊरजा पनत ा म कमी
Excludes energy exported to Bangladesh
राजयState
ऊराण वरवदयत आपरतण शथिरत ररपोरण (सशोधित) Energy Power Supply Position Report (Revised)
25
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
File NoCEA-CH-14-1142018-Coordination Division
अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met
कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )
चडीगढ़ Chandigarh 293 293 0 00 369 369 0 00
दिलली Delhi 5358 5358 0 00 7016 7016 0 00
हरियजणज Haryana 9008 9008 0 00 10270 10270 0 00
दहमजचल परिश Himachal Pradesh 1466 1466 0 00 1479 1479 0 00
रमम कशमीि Jammu amp Kashmir 2951 2361 590 200 2951 2361 590 200
परजब Punjab 11405 11405 0 00 12638 12638 0 00
िजरसथजन Rajasthan 10612 10612 0 00 11698 11698 0 00
उतति परिश Uttar Pradesh 18346 18121 225 12 20498 20062 436 21
उततिजखड Uttarakhand 1996 1996 0 00 2143 2143 0 00
उततरी कषतर Northern Region 56407 55649 758 13 63166 61726 1440 23
छततीसगढ़ Chhattisgarh 4404 4075 328 75 4404 4136 268 61
गरिजत Gujarat 16963 16963 0 00 17053 16963 90 05
मधय परिश Madhya Pradesh 8811 8771 41 05 8811 8775 36 04
महजिजषटर Maharashtra 22455 22349 106 05 23395 23254 141 06
िमन औि दिउ Daman amp Diu 357 356 1 02 357 356 1 02
िजिि व नगि हवली Dadra amp Nagar Haveli 816 815 1 01 816 815 1 01
गोवज Goa 596 596 0 00 596 596 0 00
पशचिमी कषतर Western Region 52933 52895 38 01 53841 52895 945 18
आनधर परिश Andhra Pradesh 9435 9416 19 02 9435 9416 19 02
तलगजनज Telangana 10815 10815 0 00 10815 10815 0 00
कनजाटक Karnataka 10103 10090 13 01 10690 10688 2 00
किल Kerala 3888 3638 251 64 4050 3997 53 13
तममल नजड Tamil Nadu 14556 14553 3 00 15029 14981 47 03
पडचिी Puducherry 390 372 17 45 420 400 19 46
लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0
दकषकषणी कषतर Southern Region 45542 45428 114 02 45946 45684 262 06
बबहजि Bihar 5050 5045 5 01 5050 5045 5 01
िजमोिि घजटी ननगम DVC 2641 2641 0 00 2874 2874 0 00
झजिखणड Jharkhand 1233 1233 0 00 1339 1284 55 41
ओडडशज Odisha 4906 4906 0 00 5357 5357 0 00
पशशचम बगजल West Bengal 8644 8639 5 01 9130 9123 7 01
मसशककम Sikkim 78 78 0 00 90 90 0 00
अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7
परवी कषतर Eastern Region 22110 22100 10 00 22470 22290 180 08
अरणजचल परिश Arunachal Pradesh 132 130 2 15 138 133 5 37
असम Assam 1865 1809 56 30 1865 1809 56 30
मणणपि Manipur 184 182 2 13 193 186 7 36
मघजलय Meghalaya 317 317 0 00 371 368 2 07
ममज़ोिम Mizoram 95 93 2 23 103 98 4 41
नजगजलड Nagaland 142 138 5 32 156 138 18 117
बिपिज Tripura 296 293 3 10 298 293 5 17
उततर-परवी कषतर North-Eastern Region 2921 2850 71 24 2967 2850 117 39
समपणण भारत All India 177022 175528 1494 08 177022 175528 1494 08
26
मजग की पनता म कमी मजग की पनता म कमी Demand not MetDemand not Met
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
Excludes the supply to Bangladesh
अधिकतम वरवदयत आपरतण शथिरत ररपोरण (सशोधित) Peak Power Supply Position Report (Revised)
आकड़ मगज वजट नट Figures in MW net
राजयStateससतबर2018 September2018 अपरल2018 -ससतबर2018 April2018 to September2018
File NoCEA-CH-14-1142018-Coordination Division
अकरबर2018 October2018अपरल2018 -अकरबर2018 April2018 to October2018
उततरी कषतर Northern Region
चडीगढ़ Chandigarh Data not received Data not received
दिलली Delhi
हरियजणज Haryana
दहमजचल परिश Himachal Pradesh
रमम कशमीि Jammu amp Kashmir Data not received Data not received
परजब Punjab
िजरसथजन Rajasthanउतति परिश Uttar Pradesh
उततिजखड Uttarakhand
पशचिमी कषतर Western Region
छततीसगढ़ Chhattisgarh
गरिजत Gujarat
मधय परिश Madhya Pradesh
महजिजषटर Maharashtra
गोवज Goa
दकषकषणी कषतर Southern Region
आनधर परिश Andhra Pradesh
तलगजनज Telangana
कनजाटक Karnataka
किल Kerala
तममल नजड Tamil Nadu
पडचिी Puducherryपरवी कषतर Eastern Region
बबहजि Bihar
झजिखणड Jharkhand
ओडडशज Odisha
पशशचम बगजल West Bengal
N
o No
tified
Cuts
N
o No
tified
Cuts
27
अकरबर 2018 म इडथरीर पर वरवदयत करौती का वरवरवरण Notified Power CutsRestrictions on Industries during October2018
राजय कषतर State Regionऊराणमाग करौती EnergyDemand Cut
No Notified Cuts No Notified Cuts
File NoCEA-CH-14-1142018-Coordination Division
अकरबर2018 October2018अपरल2018 -अकरबर2018 April2018 to October2018
उततरी कषतर Northern Region
चडीगढ़ Chandigarh Data not received Data not received
दिलली Delhi Data not received Data not received
हरियजणज Haryana 940 hrsday 0709 - 0950 hrsday
दहमजचल परिश Himachal Pradesh No cut imposed on agriculture consumers and uninterrupted
power is being supplied to agriculture sector
HPSEBL has only 2 agriculture consumers and uninterrupted
power is being supplied to agriculture sector
रमम कशमीि Jammu amp Kashmir Data not received Data not received
परजब Punjab 0507 hrsday 0349 - 0844 hrsday
िजरसथजन Rajasthan 0630 hrsday 0630 hrsday
उतति परिश Uttar Pradesh 1825 hrsday 1814 - 1858 hrsday
उततिजखड Uttarakhand 2350 hrsday 2128 - 2357 hrsday
पशचिमी कषतर Western Region
छततीसगढ़ Chhattisgarh 18hoursday 18 hrsday
गरिजत Gujarat 805 hrsday 805 hrsday
मधय परिश Madhya Pradesh Three-Phase Supply(Irrigation)-947 hrs day
Three-Phase (Mixed) Supply - 2311 hrs day
Three-Phase Supply(Irrigation)- 0933 - 0947 hrs day Three-
Phase (Mixed) Supply - 2300 - 2320 hrs day
महजिजषटर Maharashtra Three-Phase Supply(Irrigation)- 9 hrs day
Three-Phase (Mixed) Supply - 24 hrs day
Three-Phase Supply(Irrigation)- 9 hrs day
Three-Phase (Mixed) Supply - 24 hrs day
गोवज Goa No restriction No restriction
दकषकषणी कषतर Southern Region
आनधर परिश Andhra Pradesh 07 hrsday 07 hrsday
तलगजनज Telangana 24 hoursday 24 hoursday
कनजाटक Karnataka 6 hrsday 6 hrsday
किल Kerala No Restrictions No Restrictions
तममल नजड Tamil Nadu 9 hrsday (6 hrs during day time and 3 hrs during night time) 9 hrsday (6 hrs during day time and 3 hrs during night time)
पडचिी Puducherry No Restrictions No Restrictions
परवी कषतर Eastern Region
बबहजि Bihar About 18 hrsday About 18 hrsday
झजिखणड Jharkhand About 20 hrsday About 20 hrsday
ओडडशज Odisha 24 hrsday 24 hrsday
पशशचम बगजल West Bengal About 23 hrsday About 23 hrsday
28
अकटबर 2018 कषि कषतर को षिदयत आपरति का षििरण Power Supply to Agricultural Sector during October2018
राजय कषतर State Regionऔसत वरवदयत आपरतण घनरो म Average Hours of Supply
On segregated feeders
File NoCEA-CH-14-1142018-Coordination Division
SNo Contents Page
1 Growth of Installed Capacity since 6th Plan 29
2 Progress of Transmission Sector since 6th Plan 30
3 All India Yearly Coal consumption for Power Generation (Utilities)
4 All India Annual Per Capita Consumption of Electricity since -2006
5 Average cost of power supply amp Average realisation (Paisakwh)
6 Growth of Rural Electrification amp Pump Sets Energisation
7 Status of Hydro Schemes Cleared by the CEA in Oct-2018
Section G - Growth of Power Sector
31
32
File NoCEA-CH-14-1142018-Coordination Division
(In MW)
Coal Gas Diesel Total
End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472
End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634
End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537
End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596
End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921
End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703
End of 12th Plan 19216288 2532938 83763 21832988 6780 4447842 50018 31960630
Up to Oct-2018 19599250 2493722 837629 22176734 6780 4548742 7201281 34604757
Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-17) = 51529 MW
Electricity Generation (MU) Targets and Achievements for 2016-17
Coal Gas Diesel Nuclear Hydro Res Total
1959925 2493722 837629 678000 454874 72012805 22925174
29
1 Growth of Installed Capacity Since 6th Plan
Plan YearThermal
Nuclear Hydro RES (MNRE) Total
Total Installed Capacity 34604757 MW
Coal Gas Diesel Nuclear Hydro Res
File NoCEA-CH-14-1142018-Coordination Division
Progress of Transmission Sector in the Country up to Oct 2018
1 TRANSMISSION LINES (All fig in CKM)
At the end of
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
6th plan 0 0 0 0 0 0 0 0 0 0 0 0 1831 4198 0 6029 1641 44364 0 46005 3472 48562 0 52034
7th plan 0 0 0 0 0 0 0 0 0 0 0 0 13068 6756 0 19824 4560 55071 0 59631 17628 61827 0 79455
8th plan 0 0 0 0 1634 0 0 1634 0 0 0 0 23001 13141 0 36142 6564 73036 0 79600 31199 86177 0 117376
9th plan 0 0 0 0 3234 1504 0 4738 751 409 0 1160 29345 20033 0 49378 8687 88306 0 96993 42017 110252 0 152269
10th plan 0 0 0 0 4368 1504 0 5872 1775 409 0 2184 48708 24730 0 73438 9444 105185 0 114629 64295 131828 0 196123
11th Plan 0 0 0 0 5948 1504 1980 9432 4839 411 0 5250 71023 30191 5605 106819 10140 125010 830 135980 91950 157116 8415 257481
12th Plan 6124 0 0 6124 5948 1504 1980 9432 25465 1177 4598 31240 92482 48240 17065 157787 11014 151276 978 163268 141033 202197 24621 367851
13th Plan (Up
to Mar2018)6124 0 0 6124 5948 1504 1980 9432 28666 1512 4881 35059 98247 54286 19067 171600 11258 156497 1000 168755 150243 213799 26928 390970
13th Plan (Up
to Sep-18)6124 0 0 6124 5948 1504 1980 9432 30952 1512 5059 37523 99683 56069 20662 176414 11318 160958 1000 173276 154025 220043 28701 402769
27150
75050
47900
118050
90650
30
IR addition in 12th Plan (up to
March 2017)
Total IR (up to Oct-18)
IR at the end of 11th Plan
IR at the end of 12th Plan
Envisaged IR Capacity at the end
of 13th Plan
Grand Total
Note - The figure upto the end of 10th plan in for stringing progress including the lines not commissioned Now only commissioned lines are reckoned Accordingly the figure for 10th plan (end) may read as 187555 after adjusting with (-) 10852 Ckm
Inter-regional Power Transfer Capacity
plusmn 800 kV HVDC plusmn 500 kV HVDC 765 kV 400 kV 220 kV
File NoCEA-CH-14-1142018-Coordination Division
2004-05 27800
2005-06 28100
2006-07 30200
2007-08 33000
2008-09 35500
2009-10 36700
2010-11 38700
2011-12 41756
2012-13 45460
2013-14 48940
2014-15 53040
2015-16 54590
2016-17 57430
2017-18 60800
Year
2005-06
2006-07
2007-08
2008-09
2009-10
2010-11
2011-12
2012-13
2013-14
2014-15
2015-16
2016-17
2017-18
2004-05 254 209 7568
2005-06 260 221 7636
2006-07 276 227 7423
2007-08 293 239 7727
2008-09 340 263 8713
2009-10 355 268 8870
2010-11 398 303 11975
2011-12 455 330 13514
2012-13 501 376 14867
2013-14 518 175
2014-15 520
6719
7171
3 All India yearly Coal Consumption for Power Generation (Utilities)
YEARCoal Consumption
Million Tonnes
4 All India Annual per Capita consumption of Electricity Since 2006
Per Capita Consumption ( kWh)
6314
(GrossGen+ Net Import) Mid-year population
5 Average cost of power supply amp average realization ( paiseKWH )
Yearcost of supply
(paiseunit)
Realization(paiseunit)
Including AgricultureOnly
Agriculture
1149
7335
7786
91441
8188
88363
957
1010
1075
1122
File NoCEA-CH-14-1142018-Coordination Division
Source- PFC Reports on the performance of State Power Utilities 31
File NoCEA-CH-14-1142018-Coordination Division
Sl
NoExecuting Agency
Installed
Capacity (MW)Cost (Rs crore)
Date of
Clearance
32
No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification
since 2004-05
65291374575 296361511th Plan
Cumu upto End of 11th Plan
596556 21212860
557439Cummulative up to end of 12th Plan
46708
18423975
499150
2003-042004-05
5743
9769
Cumu upto End of 10th Plan
010407 to 310308
010410 to 310311557976840909
010411 to 310312
412667
86293726
3207
482864
12632
1576036
4451722594
15455554
2314176
397343611750
2093311060316074
65109527813884
6 Growth Of Rural Electrification amp Pumpsets Energisation
Plan Year
9th Plan2002-03
134092626
4111
Pump Sets Energised Villages Electricfied (Nos)
2001-02
284064367244
1218
27801997-981998-991999-002000-01
297594
010408 to 310309010409 to 310310
10th Plan
2005-062006-07
322968331020
Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as
Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received
from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made
available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified
villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is
independent of the earlier published reports
No Hydro Electric Project has been issued concurrenceAppraisal letter by CEA during October 2018
7 Status of Hydro Schemes Cleared by the CEA in Oct-2018
Name of Scheme
File NoCEA-CH-14-1142018-Coordination Division
SN Contents Page
1 Rate of sale of power for the year 2016-17 33-41
RATE OF SALE OF POWER FOR THE YEAR 2016-17
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) NORTHERN REGION
CENTRAL SECTOR
BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 18000 66900 19800
CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 54000 222400 21600
CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 30000 144400 19600
CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 23100 91700 42600
PARBATI - III HPS NHPC LTD HYDRO-HYDRO 52000 68200 54800
DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 28000 95600 30000
CHUTAK NHPC LTD HYDRO-HYDRO 4400 22000 79800
DULHASTI HPS NHPC LTD HYDRO-HYDRO 39000 228000 56400
SALAL HPS NHPC LTD HYDRO-HYDRO 69000 342300 11000
TANAKPUR HPS NHPC LTD HYDRO-HYDRO 9420 43000 29600
URI HPS -I NHPC LTD HYDRO-HYDRO 48000 280300 16000
URI HPS - II NHPC LTD HYDRO-HYDRO 24000 147300 48600
NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 4500 24600 88200
SEWA - II NHPC LTD HYDRO-HYDRO 12000 47100 43400
ANTA CCPP NTPC LTD THERMAL-GASN 41930 67539 32400
AURAIYA CCPP NTPC LTD THERMAL-GASN 66336 53501 39100
BADARPUR TPS NTPC LTD THERMAL-COAL 70500 159153 44800
DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 84000 296170 42300
DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 98000 526686 46300
DADRI CCPP NTPC LTD THERMAL-GASHSD 82978 227469 33000
FARIDABAD CCPP NTPC LTD THERMAL-GASN 43159 115577 30800
RIHAND STPS I NTPC LTD THERMAL-COAL 100000 596766 24500
RIHAND STPS II NTPC LTD THERMAL-COAL 100000 737069 24600
RIHAND STPS III NTPC LTD THERMAL-COAL 100000 706546 30600
SINGRAULI STPS NTPC LTD THERMAL-COAL 200000 1394068 20400
TANDA TPS NTPC LTD THERMAL-COAL 44000 295438 40800
UNCHAHAR TPS I NTPC LTD THERMAL-COAL 42000 256454 39800
UNCHAHAR TPS II NTPC LTD THERMAL-COAL 42000 273577 38900
UNCHAHAR TPS III NTPC LTD THERMAL-COAL 21000 142780 43000
KOLDAM NTPC LTD HYDRO-HYDRO 80000 363260 43600
NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 303575 25841
RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 108000 668677 35374
NJHPS SJVNL HYDRO-HYDRO 150000 699496 23820
RAMPUR HPS SJVNL HYDRO-HYDRO 41202 195982 32260
TEHRI HPP THDC HYDRO-HYDRO 100000 272543 51800
KOTESHWAR HEP THDC HYDRO-HYDRO 40000 106244 53400
IGSTPS JHAJJAR ARAVALI P CPL THERMAL-COAL 150000 510429 49490
NEYVELI BARSINGSAR NEYVELI LIG CORP LTD THERMAL-LIG 25000 127520 38040
STATE SECTOR
PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 21000 14222 48200
PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 21000 19205 48400
PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 25000 102257 42600
PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 25000 62107 41800
DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 60000 312213 41000
RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 120000 35767442200
WYC HYDEL STATION HPGCL HYDRO-HYDRO 6240 20365 24900
GIRI POWER HOUSE HPSEB HYDRO-HYDRO 6000 13958 7600
ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 1695 5467 11900
BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 12000 18528 6700
GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 2250 7462 22500
BASSI POWER HOUSE HPSEB HYDRO-HYDRO 6600 29649 7500
BINWA POWER HOUSE HPSEB HYDRO-HYDRO 600 2749 19300
ANNEXURE-I
RATE OF SALE OF POWER FOR THE YEAR 2016-2017
Page 33
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) GAJ POWER HOUSE HPSEB HYDRO-HYDRO 1050 2914 26700
BANER POWER HOUSE HPSEB HYDRO-HYDRO 1200 2864 16200
HOLI POWER HOUSE HPSEB HYDRO-HYDRO 300 616 22500
THIROT POWER HOUSE HPSEB HYDRO-HYDRO 450 1126 22500
KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 1200 3064 22500
LARJI POWER HOUSE HPSEB HYDRO-HYDRO 12600 53677 23700
NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 250 750 31000
CHABA POWER HOUSE HPSEB HYDRO-HYDRO 175 465 23300
RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 150 101 13400
SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 200 000 22500
KILLAR HPSEB HYDRO-HYDRO 030 050 22500
BHABA AUGUMENP H HPSEB HYDRO-HYDRO 450 1276 22500
BS CHAMBA HPSEB HYDRO-HYDRO 045 099 19500
GUMMA HPSEB HYDRO-HYDRO 300 423 22500
GAS TURBINE POWER STATION IPGCL THERMAL-GAS 27000 67233 39300
PPS-I PPCL THERMAL-GAS 33000 175905 38300
PPS-III PPCL THERMAL-GAS 137120 196879 36100
LOWER JHELUM JampKPDD HYDRO-HYDRO 10500 60214 5100
UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 2260 10514 6300
UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 10500 44202 8500
GANDHARBAL JampKPDD HYDRO-HYDRO 1500 8925 4700
KARNAH MPH JampKPDD HYDRO-HYDRO 200 1122 31000
CHENANI I JampKPDD HYDRO-HYDRO 2330 10892 6600
CHENANI II JampKPDD HYDRO-HYDRO 200 1188 9300
CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 750 3634 14200
IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 375 2108 18500
IGO MERCHELLONG JampKPDD HYDRO-HYDRO 300 1572 29700
PAHALGAM MHP JampKPDD HYDRO-HYDRO 450 1713 32900
MARPACHOO JampKPDD HYDRO-HYDRO 075 375 29800
HAFTAL JampKPDD HYDRO-HYDRO 100 483 28700
SANJAK JampKPDD HYDRO-HYDRO 126 441 36000
SEWA-III JampKPDD HYDRO-HYDRO 900 3273 20200
BHADERWAH JampKPDD HYDRO-HYDRO 150 935 8900
BAZGO JampKPDD HYDRO-HYDRO 030 108 33300
SUMOOR JampKPDD HYDRO-HYDRO 010 045 35400
HUNDER JampKPDD HYDRO-HYDRO 040 176 26200
STAKNA JampKPDD HYDRO-HYDRO 400 1933 4100
KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 124000 662879 31360
SURATGARH TPS RRVUNL THERMAL-COAL 150000 402328 41730
CHHABRA TPS 1amp 2 RRVUNL THERMAL-COAL 50000 305946 36700
CHHABRA TPS 3 RRVUNL THERMAL-COAL 25000 151536 36700
CHHABRA TPS 4 RRVUNL THERMAL-COAL 25000 155896 36700
RAMGARH GT POWER PROJECT RRVUNL THERMAL-COAL 22050 43177 41800
RAMGARH GAS T P PROJECT 3 RRVUNL THERMAL-GAS 5000 93615 41800
DHOLPUR C C POWER PROJECT RRVUNL THERMAL-R-LNG 33000 9486 46110
MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 14000 20855 34192
MINI MICRO HYDEL (MMH) P S RRVUNL HYDRO-HYDRO 2385 851 37800
KALISINDH TPP 1 RRVUNL THERMAL-COAL 60000 341543 45000
KALISINDH TPP 2 RRVUNL THERMAL-COAL 60000 211588 45000
KHARA HEP UPJVNL HYDRO-HYDRO 7200 26654 7200
MATATILLA HEP UPJVNL HYDRO-HYDRO 3060 12219 6500
OBRA HEP UPJVNL HYDRO-HYDRO 9900 21517 6300
RIHAND UPJVNL HYDRO-HYDRO 30000 57369 5500
ANPARA A TPS UPRVUNL THERMAL-COAL 63000 317536 27000
ANPARA B TPS UPRVUNL THERMAL-COAL 100000 705605 22700
ANPARA D UPRVUNL THERMAL-COAL 100000 300158 39800
HARDUAGANJ TPS UPRVUNL THERMAL-COAL 16500 45817 49200
HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 50000 304389 46600
OBRA A TPS UPRVUNL THERMAL-COAL 28800 13158 34000
OBRA B TPS UPRVUNL THERMAL-COAL 100000 328124 21900
Page 34
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) PANKI TPS UPRVUNL THERMAL-COAL 21000 66488 50300
PARICHHA TPS UPRVUNL THERMAL-COAL 22000 38762 49400
PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 42000 231931 45600
PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 50000 276722 50400
CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 24000 70845 8290
CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 14400 75366 8390
DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 3375 9595 12080
DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 5100 18701 10520
KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4140 17359 12330
KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 12000 33001 9420
KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 3000 11953 8320
TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 9000 33983 12460
MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 30400 124510 16110
RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 19800 17897 10550
MPUR UTTARAKHAND JVNL HYDRO-HYDRO 930 5121 19200
PATHRI UTTARAKHAND JVNL HYDRO-HYDRO 2040 11636 14200
GALOGI UTTARAKHAND JVNL HYDRO-HYDRO 300 648 12500
PRIVATE SECTOR
MGTPP CLP INDIA PVT LTD THERMAL-COAL 132000 268902 41940
SHRINAGAR HEP ALAKNANDA HPCL HYDRO-HYDRO 33000 127414 48800
GAMA INFRAPROP CCPP GAMA INFRAPROP PVT THERMAL-GAS 22500 52686 47000
PPGCL (BARA) JP POWER VENTURES LTD THERMAL-COAL 198000 448200 38500
MALANA HEP MALANA PCL HYDRO-HYDRO 8600 26354 29792
MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 10000 30369 32580
ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 19200 56347 36079
KASHANG HEP H P PCL HYDRO-HYDRO 19500 5034 29200
BASPA-II HEP HBPCL HYDRO-HYDRO 30000 132769 13600
KARCHAM WANGTOO HEP HBPCL HYDRO-HYDRO 100000 434386 36600
RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 108000 582600 43700
RITHALA COMBI CY POWER PLANT TATA POWER DDL THERMAL-GAS 9480 000 11900
RAJPURA TPS NABHA POWER LTD THERMAL-GAS 140000 901484 39000
TALWANDI SABO POWER LTD TALWANDI SABO POWER LTD THERMAL-COAL 198000 636040 49548
ROJA THERMAL POWER STATION ROJA POWER SCL THERMAL-COAL 120000 727200 43400
KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 34400 63400
BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 36000 62600
MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 38200 60800
UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 37900 61500
KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 42300 58800
LALITPUR PGCL BAJAJ ENERGY PVT LTD THERMAL-COAL 198000 359400 47300
PRAYAGRAJ PGCL PRAYAGRAJ PGCL THERMAL-COAL 132000 448200 38595
KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 132000 783182 33438
WESTERN REGION
CENTRAL SECTOR
INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 100000 325333 23892
OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 52000 141663 34001
GANDHAR CCPP NTPC LTD THERMAL-GAS 65739 221924 28700
KAWAS CCPP NTPC LTD THERMAL-GASN 65620 167929 27000
KORBA I amp II NTPC LTD THERMAL-COAL 210000 1499171 20500
KORBA III NTPC LTD THERMAL-COAL 50000 358746 26600
SIPAT STPS I NTPC LTD THERMAL-COAL 198000 1479902 26800
SIPAT STPS II NTPC LTD THERMAL-COAL 100000 766549 26500
VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 126000 693142 25800
VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 100000 608781 23800
VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 100000 673475 27600
VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 100000 655924 32900
VINDHYACHAL STPS V NTPC LTD THERMAL-COAL 50000 328265 31700
MOUDA I NTPC LTD THERMAL-COAL 100000 343130 44500
MOUDA Ii NTPC LTD THERMAL-COAL 66000 40637 39900
RATNAGIRI GAS amp POWER PVT LTD RGPPL THERMAL-GAS 196708 442485 47000
KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 000 24729
TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 32000 201227 10740
Page 35
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 365122 19069
TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 787444 29324
STATE SECTOR
GSEG-HAZIRA15610 MW GUJARAT S ENEGEN LTD THERMAL-GAS 15610 1805 28200
GSEG-HAZIRA35143 MW GUJARAT S ENEGEN LTD THERMAL-GAS 35130 22276 51300
GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 21978 51800
AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 13929 26100
KORBA TPS EAST CSPGCL THERMAL-COAL 44000 198673 33880
DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 365808 27570
KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 316500 30420
HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 532878 19410
CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 515 58300
MTTPS CHAMPA U-I CSPGCL THERMAL-COAL 50000 220376 39000
MTTPS CHAMPA U-II CSPGCL THERMAL-COAL 50000 23709 10000
SHP GANGREL CSPGCL HYDRO-HYDRO 1000 2350 36790
BANGO HEP CSPGCL HYDRO-HYDRO 12000 14662 8900
MHP KORBA WEST CSPGCL HYDRO-HYDRO 170 859 38190
SIKASAR HEP CSPGCL HYDRO-HYDRO 700 418 26870
DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8843 74500
DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 19446 51500
GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 66388 71600
GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127488 41300
KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 96072 43900
KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 29841 56400
SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 184966 58800
UKAI 1-5 GSECL THERMAL-COAL 85000 204891 46900
UKAI TPS 6 GSECL THERMAL-COAL 50000 284448 48200
WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 271999 58300
WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 82808 44100
KADANA HPS GSECL HYDRO-HYDRO 24200 34433 16800
UKAI HPS GSECL HYDRO-HYDRO 30500 40585 6100
TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 123000 11500
BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 8900 10900
BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 7200 27500
JHINNA HPS MPPGCL HYDRO-HYDRO 2000 9700 18500
RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 44300 3400
GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 17300 4600
SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 4100 16900
MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 14600 27000
PENCH HPS MPPGCL HYDRO-HYDRO 16000 23700 8100
RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 3000 16900
AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 134400 35100
SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 283800 38700
SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 344600 34300
SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 111600 61600
SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 211800 58000
SSTPS PH-I MPPGCL THERMAL-COAL 120000 233100 84300
BHUSAWAL TPS MSPGCL THERMAL-COAL 142000 566258 51100
CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1365682 33700
KHAPERKHEDA MSPGCL THERMAL-COAL 134000 706207 39100
KORADI TPS MSPGCL THERMAL-COAL 62000 443206 42000
NASIK TPS MSPGCL THERMAL-COAL 63000 297275 47000
PARLI TPS MSPGCL THERMAL-COAL 113000 175934 71600
PARAS MSPGCL THERMAL-COAL 50000 267931 38700
URAN CCPP MSPGCL THERMAL-GAS 67200 320330 30600
KOYANA MSPGCL HYDRO-HYDRO 195600 328155 13100
SMALL HYDRO POWER PLANTS MSPGCL HYDRO-HYDRO 45400 93062 30500
BHIRA MSPGCL HYDRO-HYDRO 8000 10046 8400
TILLARI MSPGCL HYDRO-HYDRO 8900 10584 3100
SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 233298 20500
SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 87633 20500
PRIVATE SECTOR
Page 36
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 81282 46750
JNSTPP(JAYPEE NIGRIE) JP POWER VENTURES LTD THERMAL-COAL 132000 726695 29310
MB POWER MB POWER THERMAL-COAL 120000 345632 38310
ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 754922 28671
ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 780761 23495
ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 198000 1263784 32090
ADANI POWER MAHARA ADANI POWER LTD THERMAL-COAL 330000 1666191 34124
AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 170065 36827
SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 252035 45129
ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 458551 36000
ESSAR POWER MP LTD ESSAR POWER MP LTD THERMAL-COAL 60000 243040 28600
VEDANTA LTD (P P -I) VEDANTA LTD THERMAL-GAS 3000 15044 24000
VEDANTA LTD (P P -II) VEDANTA LTD THERMAL-GAS 3000 21293 24000
PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 8234600 24000
165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 5850 64390
145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 68717 40349
SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 132655 28776
SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 144686 38567
MUNDRA UMPPCOASTAL GUJARAT POWER
LTD THERMAL-IMP COAL 400000 2530300
23900
LANCO AMARKANTAK TPP PATHADIH
U-ILANCO AMARKAN POWER LTD THERMAL-COAL 30000 195500
29200
LANCO AMARKANTAK TPP PATHADIH
U-IILANCO AMARKAN POWER LTD THERMAL-COAL 30000 206900
27600
BARADARHA TPS D B POWER LTD THERMAL-COAL 120000 677373 29200
JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 405000 28900
JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 453000 40500
DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 339437 40700
TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 293400 44000
TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 137200 37000
TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 174900 44000
BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 92900 14100
BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23700 34300
KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 27600 48300
CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2530300 23900
BHANDARDRA HEP -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 2475 54900
SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 161400 26500
SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 445000 39000
SOTHERN REGION
CENTRAL SECTOR
NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 325699 54820
NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 305532 39880
NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 998805 38510
NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 113016 54070
NEYVELI TAMILNADU POWER LTD JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 625274 42200
VALLUR TPS NTPC TECL THERMAL-COAL 150000 856438 42350
R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 1493 84300
RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1502919 29400
RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 341291 31800
SIMHADRI I NTPC LTD THERMAL-COAL 100000 688382 36800
SIMHADRI II NTPC LTD THERMAL-COAL 100000 663657 43400
KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 593110 31324
MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 291625 21764
KKNPP-1 amp 2 NPCIL NUCLEAR-NUCLEAR 200000 572609 40948
MINICOY LAKSHADEEP THERMAL-DIESEL 340 770 29600
KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1097 29600
AMINI LAKSHADEEP THERMAL-DIESEL 265 509 29600
ANDROTT LAKSHADEEP THERMAL-DIESEL 219 524 29600
KALPENI LAKSHADEEP THERMAL-DIESEL 175 356 29600
AGATTI LAKSHADEEP THERMAL-DIESEL 195 658 29600
KADMAT LAKSHADEEP THERMAL-DIESEL 190 414 29600
KILTAN LAKSHADEEP THERMAL-DIESEL 150 269 29600
CHETLET LAKSHADEEP THERMAL-DIESEL 100 139 29600
BITRA LAKSHADEEP THERMAL-DIESEL 043 024 29600
BANGARAM LAKSHADEEP THERMAL-DIESEL 018 009 29600
Page 37
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) STATE SECTOR
Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 721811 46500
Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 50000 336142 46500
RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 237358 46500
RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 239926 46500
RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 124500 46500
SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 62109 46500
UPPER SILERU APGENCO HYDRO-HYDRO 24000 33000 46500
LOWER SILERU APGENCO HYDRO-HYDRO 46000 81066 46500
DONKARAI APGENCO HYDRO-HYDRO 2500 6007 46500
PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 1262 46500
CHETTIPETA APGENCO HYDRO-HYDRO 100 214 46500
MUCHKUND APGENCO HYDRO-HYDRO 12000 37571 46500
NAGARJUNASAGAR RCPH APGENCO HYDRO-HYDRO 9000 606 46500
TUNGABHADRA HES amp HAMPI(AP
Share)
APGENCO HYDRO-HYDRO 7200 6100 46500
KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 352232 42600
KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 288131 32500
KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 319272 46500
RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 40073 44300
KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 308317 46000
KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 308963 51300
SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 61004 76600
NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 17960 75300
PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 20873 58300
POCHAMPAD-I TSPGENCO HYDRO-HYDRO 2700 5455 29800
POCHAMPAD-II TSPGENCO HYDRO-HYDRO 900 1932 40700
NIZAMSAGAR TSPGENCO HYDRO-HYDRO 1000 1126 53400
RAICHUR TPS 1 to 7 KPCL THERMAL-COAL 147000 890866 43800
RAICHUR TPS 8 KPCL THERMAL-COAL 25000 159523 48200
BELLARI TPS 1 KPCL THERMAL-COAL 50000 318679 51100
BELLARI TPS 2 KPCL THERMAL-COAL 50000 232347 55600
BELLARI TPS 3 KPCL THERMAL-COAL 70000 47565 34400
BHADRA PH KPCL HYDRO-HYDRO 3920 2369 45900
GERUSUPPA PH KPCL HYDRO-HYDRO 24000 26990 22000
GHAT PRABHA HEP KPCL HYDRO-HYDRO 3200 4777 25300
KADRA HPS KPCL HYDRO-HYDRO 15000 16889 26800
NAGJHARI KPCL HYDRO-HYDRO 90000 155159 9800
KODASALLI DPH KPCL HYDRO-HYDRO 12000 14854 19200
MUNIRA+MGH+SPH+SPH KPCL HYDRO-HYDRO 22640 48211 7900
SHARAVATHY HPS KPCL HYDRO-HYDRO 108550 276215 5400
ALMATTI DPH KPCL HYDRO-HYDRO 29000 39611 24600
VARAHI UGPH KPCL HYDRO-HYDRO 46000 71368 15600
IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 17196 15300
IDUKKI HPS KSEB HYDRO-HYDRO 78000 137905 15300
KAKKAD HPS KSEB HYDRO-HYDRO 5000 13063 15300
KALLADA HPS KSEB HYDRO-HYDRO 1500 4436 15300
KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 46544 15300
KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 635 15300
LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 30822 15300
MALANKARA HPS KSEB HYDRO-HYDRO 1050 2474 15300
MATTUPETTY KSEB HYDRO-HYDRO 200 230 15300
MALAMPUZHA KSEB HYDRO-HYDRO 250 063 15300
CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 864 15300
URUMI ST I amp II KSEB HYDRO-HYDRO 615 903 15300
LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 248 15300
NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7765 19625 15300
PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 16601 15300
PANNIAR HPS KSEB HYDRO-HYDRO 3240 6217 15300
PORINGALKUTHU KSEB HYDRO-HYDRO 3600 10052 15300
PORINGALKUTHU LBE KSEB HYDRO-HYDRO 1600 9438 15300
PEPPARA KSEB HYDRO-HYDRO 300 395 15300
POOZHITHODE KSEB HYDRO-HYDRO 480 1045 15300
Page 38
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) PEECHI KSEB HYDRO-HYDRO 125 040 15300
RANI-PERUNADU KSEB HYDRO-HYDRO 400 585 15300
SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 79783 15300
SENGULAM HPS KSEB HYDRO-HYDRO 5120 11558 15300
SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 16711 15300
VILANGAD KSEB HYDRO-HYDRO 750 1578 15300
BARAPOLE KSEB HYDRO-HYDRO 1500 1932 15300
VELLATHOOVAL KSEB HYDRO-HYDRO 360 305 15300
CHIM0NY KSEB HYDRO-HYDRO 250 156 15300
ADYANPARA KSEB HYDRO-HYDRO 350 501 15300
BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 554 15300
KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 3801 15300
KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 23132 32800
ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 14416 62280
METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 523970 62280
METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 321270 62280
NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 336575 62280
NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 591240 62280
TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 508966 62280
KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 30897 62280
VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 18720 90699 62280
KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 33593 62280
BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 1047 62280
PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 1250 62280
PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 330 62280
MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 4897 62280
MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 032 62280
KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15681 62280
KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 40608 62280
KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 21342 62280
KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 4717 62280
KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4322 62280
KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2399 62280
METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 4416 62280
METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 8035 62280
BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2187 62280
BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2359 62280
BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2511 62280
BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 1949 62280
BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 1819 62280
POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 172 62280
SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 241 62280
MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 026 62280
THIRUMOORTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 136 62280
PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 9309 62280
VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 353 62280
SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 4192 62280
PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 6571 62280
SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 1186 62280
SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6319 62280
ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 6122 62280
KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 28674 62280
SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 18381 62280
SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 4258 62280
KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 12680 62280
KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4201 62280
ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 000 62280
PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 19175 62280
AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 078 62280
BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 504 62280
BHAVANI KATTALAI (BKB)(IIIampIII BB I amp II)TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 5847 62280
PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 000 62280
Page 39
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) SRI DAMODARAM STPS APPDCL THERMAL-COAL 160000 808108 36300
PRIVATE SECTOR
KARUPPUR TANJORE LANCO TANJORE PCL THERMAL-GAS 12000 48096 28770
SIMHAPURI ENERGY LTD SIMHAPURI ENERGY LTD THERMAL-COAL 60000 143900 39100
JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 7111 45500
SBU 1 JSW ENERGY LTD
VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 26000 159100
43300
SBU 2 JSW ENERGY LTD
VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 60000 247900
42800
LANCO KPLLANCO KONDAPALLI POWER
LTDTHERMAL-GAS 36814 85060
25776
LANCO KPL STG -IILANCO KONDAPALLI POWER
LTDTHERMAL-GAS 36600 12979
46330
LANCO KPL STG -IIIALANCO KONDAPALLI POWER
LTDTHERMAL-GAS 37100 85710
46330
LANCO KPL STG -III BLANCO KONDAPALLI POWER
LTDTHERMAL-GAS 37100 43639
46330
HINDUJA NATIONAL PCL HINDUJA NATIONAL PCL THERMAL-COAL 104000 303000 38200
MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 121164 49940
UDUPI POWER COR LTD ADANI POWER LTD THERMAL-COAL 120000 754613 42500
SPECTRUM POWER GENERATION
LTD SPECTRUM PG LTD THERMAL-GASN 20525 9256812
34952
TAQA NEYVELI POWER COM PVT
LTD TAQA NEYVELI THERMAL-LIG 25000 5840
34500
ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 251000 51000
ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 207860 36800
GMR VEMAGIRI POWER GENERATION
LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 30117
46450
EASTERN REGION
CENTRAL SECTOR
MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 64675 53113
MTPS STAGE - II KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 39000 1432 69138
BOKARO `B` TPS DVC THERMAL-COAL 63000 145670 31539
MEJIA TPS U 1-3 DVC THERMAL-COAL 63000 348298 31552
MEJIA TPS U 4 DVC THERMAL-COAL 21000 116099 34997
MEJIA TPS U 5-6 DVC THERMAL-COAL 50000 276427 35976
MEJIA TPS U 7-8 DVC THERMAL-COAL 100000 552854 36991
DURGAPUR STEEL TPS DVC THERMAL-COAL 100000 665550 39323
DURGAPUR TPS DVC THERMAL-COAL 21000 59270 35416
RAGHUNATHPUR TPS DVC THERMAL-COAL 120000 201650 35326
MAITHON HYDEL STA DVC HYDRO-HYDRO 6320 12200 17984
CHANDRAPURA TPSU1-3 DVC THERMAL-COAL 42000 257610 35095
CHANDRAPURA TPSU7-8 DVC THERMAL-COAL 50000 306673 34987
KODERMA TPS DVC THERMAL-COAL 100000 380180 38131
PANCHET HPS DVC HYDRO-HYDRO 8000 13360 17984
TILLAYA HPS DVC HYDRO-HYDRO 400 1410 17984
RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34700 35400
TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 277300 23200
TLDP -III NHPC LTD HYDRO-HYDRO 13200 55400 62000
TLDP -IV NHPC LTD HYDRO-HYDRO 16000 60300 25600
FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 957219 33700
FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 308943 41000
BONGAINGAON TPS NTPC LTD THERMAL-COAL 25000 153663 58600
KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 542277 34200
KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 942591 34200
BARH-II NTPC LTD THERMAL-COAL 132000 728021 44500
TALCHER TPS NTPC LTD THERMAL-COAL 46000 335521 30100
TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 702319 25600
TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1436521 24700
STATE SECTOR
BTPS(RampM) BIHAR STATE PGCL THERMAL-COAL 22000 12142 39700
BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 98331 10602
HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 50593 9482
CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 19689 2605
RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 53192 6033
UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 147208 14637
Page 40
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 60353 4519
IB TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 288567 25000
J P H GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 210 038 61100
MEYONG CHU GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 400 1086 61100
TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 122667 38200
DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 214339 43321
KOLAGHAT THERMAL POWER
STATION
WEST BENGAL PDCL THERMAL-COAL 126000 538269 31603
BAKRESHWAR THERMAL POWER
PLANT
WEST BENGAL PDCL THERMAL-COAL 105000 634876 32154
BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 45000 166855 33299
SANTHALDIH THERMAL POWER
STATION
WEST BENGAL PDCL THERMAL-COAL 50000 336442 34932
SAGARDIGHI THERMAL POWER
PROJECT
WEST BENGAL PDCL THERMAL-COAL 160000 423121 34705
JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 20344 68900
RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 24559 68900
TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 4623 68900
PURULIA PUMPED STORAGE
PROJECT
WEST BENGAL SEDCL HYDRO-HYDRO 90000 108816 68900
MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2768 68900
PRIVATE SECTOR
CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 49474 20230
CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 555500 70200
HALDIA ENERGY HALDIA ENERGY LTD THERMAL-COAL 60000 371000 50400
DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3688 63400
KAMALANGA TPS GMR KAMALANGA ENERGY LTD THERMAL-COAL 105000547670
33300
ADHUNIK POWER U-1 ADHUNIK POWER THERMAL-COAL 27000 158 44060
ADHUNIK POWER U-2 ADHUNIK POWER THERMAL-COAL 27000 168 44250
VL-JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 332800 23622
JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 43000 45250
JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 71700 37030
JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 70700 35920
JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 71100 38870
JOJOBERA UNIT 5 TATA POWER COM LTD THERMAL-COAL 12000 79300 44560
JOJOBERA UNIT 6 TATA POWER COM LTD THERMAL-WHR 12000 83700 12840
IEL KALINGANAGAR U-I TATA POWER COM LTD THERMAL-WG 6750 33400 22500
IEL KALINGANAGAR U-II TATA POWER COM LTD THERMAL-WG 6750 34800 22500
MAITHON UNIT 1 amp 2 TATA POWER COM LTD THERMAL-COAL 105000 678000 36100
HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 27500 24340
HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 28400 24340
HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 15800 24310
NORTH EASTERN REGION
CENTRAL SECTOR
LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 74100 36600
AGARTALA GT NEEPCO THERMAL-GAS 13500 88611 27210
ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 153111 32310
DOYANG HEP NEEPCO HYDRO-HYDRO 7500 25598 49801
KOPILI HEP NEEPCO HYDRO-HYDRO 20000 98186 11491
KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 19582 20237
KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 10310 17968
RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 124093 22945
TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 10100 17344 39000
STATE SECTOR
HYDRO POWER (122 Stns) ITANAGAR GOVT OF ARUNACHAL
PRADESHHYDRO-HYDRO 6971 6217270
24600
KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39514 17337
LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 82327 36810
NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 33318 48290
MYNTRIANG SHEP ST II ASSAM POWER GENCO HYDRO-HYDRO 300 567 35776
LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 9130 49200
LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 012 49200
DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 022 49200
TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 000 49200
UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 4990 16000
UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 6476 37000
UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 16494 14600
UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 3600 9556 15000
SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 758 8000
MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44070 44800
KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 154 41400
TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 091 41400
MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 411 41400
MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 394 41400
KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 760 41400
SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 3264 41400
LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 044 41400
BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 18953 28000
ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 43585 28200
GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 4080 11100
Note
LIG Lignite N Naptha WHR Waste Heat Recovery
Page 41
File NoCEA-CH-14-1142018-Coordination Division
Coal Gas Diesel Total
State 13500 180040 000 193540 000 000 000 193540
Private 86922 10800 000 97722 000 000 12157 109879
Central 311272 20701 000 331973 10283 72309 000 414565
Sub-Total 411694 211541 000 623235 10283 72309 12157 717984
State 272000 15000 000 287000 000 110282 5930 403212
Private 408078 000 000 408078 000 20000 34745 462823
Central 129472 53561 000 183034 10094 66370181 500 259998
Sub-Total 809550 68561 000 878112 10094 196652 41175 1126032
State 000 000 000 000 000 69460 25661 95121
Private 000 000 000 000 000 99200 60536 159736
Central 18340 6201 000 24541 2895 122388 000 149824
Sub-Total 18340 6201 000 24541 2895 291048 86197 404681
State 000 17500 000 17500 000 123000 12903 153403
Private 000 000 000 000 000 000 5985 5985
Central 50639 12907 000 63547 6798 109188 000 179533
Sub-Total 50639 30407 000 81047 6798 232188 18888 338921
State 176000 15000 000 191000 000 259770 12780 463550
Private 511550 000 000 511550 000 28800 115462 655812
Central 85458 26401 000 111859 19681 92342 000 223882
Sub-Total 773008 41401 000 814409 19681 380912 128242 1343244
State 585000 60380 000 645380 000 109618 2385 757383
Private 388200 000 000 388200 000 10400 710680 1109280
Central 120625 22110 000 142735 55674 73901 29400 301710
Sub-Total 1093825 82490 000 1176315 55674 193919 742465 2168373
State 546900 000 000 546900 000 72410 2510 621820
Private 871433 000 000 871433 000 84200 266691 1222324
Central 379639 54949 000 434588 28948 180253 3000 646789
Sub-Total 1797972 54949 000 1852921 28948 336863 272201 2490933
State 000 000 000 000 000 125215 6787 132002
Private 9900 45000 000 54900 000 8800 52244 115944
Central 34324 6966 000 41290 3124 47554 000 91968
Sub-Total 44224 51966 000 96190 3124 181569 59031 339914
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 3035 3035
Central 3815 1503 000 5317 801 10171 000 16289
Sub-Total 3815 1503 000 5317 801 10171 3035 19324
124953 29105 000 154058 23703 75145 000 252907
State 1593400 287920 000 1881320 000 869755 68956 2820031
Private 2276083 55800 000 2331883 000 251400 1261535 3844818
Central 1258537 234406 000 1492943 162000 849622 32900 2537465
Grand Total 5128020 578126 000 5706146 162000 1970777 1363391 9202314
Uttar Pradesh
Uttarakhand
Chandigarh
Grand TotalThermalNuclear
Hydro
(Renewable)
RES
(MNRE)
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
NORTHERN REGION
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
(As on 31102018)
Central - Unallocated
Total (Northern
Region)
Delhi
Haryana
Himachal Pradesh
Jammu amp Kashmir
Punjab
Rajasthan
State Ownership Sector
Modewise breakup
File NoCEA-CH-14-1142018-Coordination Division
(As on 31102018)
Coal Gas Diesel Total
State 000 000 000 000 000 000 005 005
Private 000 4800 000 4800 000 000 091 4891
Central 45478 1967 000 47445 2600 000 000 50045
Sub-Total 45478 6767 000 52245 2600 000 096 54941
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 1301 1301
Central 12663 4334 000 16997 700 000 000 17697
Sub-Total 12663 4334 000 16997 700 000 1301 18998
State 475000 217782 000 692782 000 77200 800 770782
Private 776567 396000 000 1172567 000 000 729782 1902349
Central 309051 42400 000 351451 55900 000 23830 431181
Sub-Total 1560618 656182 000 2216800 55900 77200 754412 3104312
State 408000 000 000 408000 000 170366 8396 586762
Private 617400 10000 000 627400 000 000 378205 1005605
Central 279441 25700 000 305141 27300 152000 30000 514441
Sub-Total 1304841 35700 000 1340541 27300 322366 416601 2106808
State 228000 000 000 228000 000 12000 1105 241105
Private 849000 000 000 849000 000 000 52430 901430
Central 195344 000 000 195344 4800 10000 000 210144
Sub-Total 1272344 000 000 1272344 4800 22000 53535 1352679
State 1017000 67200 000 1084200 000 285084 20813 1390097
Private 1245600 56800 000 1302400 000 48100 842815 2193315
Central 433475 227273 000 660748 69000 000 12300 742048
Sub-Total 2696075 351273 000 3047348 69000 333184 875927 4325459
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 546 546
Central 17444 6634 000 24078 900 000 000 24978
Sub-Total 17444 6634 000 24078 900 000 546 25524
211400 19759 000 231159 22800 000 000 253959
State 2128000 284982 000 2412982 000 544650 31119 2988751
Private 3488567 467600 000 3956167 000 48100 2005170 6009437
Central 1504295 328067 000 1832362 184000 162000 66130 2244492
Grand Total 7120862 1080649 000 8201511 184000 754750 2102418 11242679
Central - Unallocated
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
WESTERN REGION
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
State Ownership Sector
Modewise breakup
Grand TotalThermalNuclear
Hydro
(Renewable)
RES
(MNRE)
Total (Western
Region)
Goa
Daman amp Diu
Gujarat
Madhya Pradesh
Chhattisgarh
Maharashtra
Dadra amp Nagar
Naveli
File NoCEA-CH-14-1142018-Coordination Division
(As on 31102018)
Coal Gas Diesel Total
State 501000 23540 000 524540 000 167360 4875 696775
Private 387388 381318 3680 772386 000 000 693073 1465459
Central 167456 000 000 167456 12727 000 25000 205183
Sub-Total 1055844 404858 3680 1464382 12727 167360 722948 2367417
State 508250 000 000 508250 000 247993 4022 760265
Private 83945 83182 000 167127 000 000 375048 542175
Central 195612 000 000 195612 14873 000 1000 211485
Sub-Total 787807 83182 000 870989 14873 247993 380070 1513925
State 502000 000 12792 514792 000 359980 15533 890305
Private 195850 000 2520 198370 000 000 1275640 1474010
Central 282920 000 000 282920 69800 000 000 352720
Sub-Total 980770 000 15312 996082 69800 359980 1291173 2717035
State 000 000 15996 15996 000 188150 15402 219548
Private 61500 17400 000 78900 000 000 20899 99799
Central 114322 35958 000 150280 36200 000 5000 191480
Sub-Total 175822 53358 15996 245176 36200 188150 41301 510827
State 432000 52408 000 484408 000 220320 12270 716998
Private 483767 50310 41170 575247 000 000 1130984 1706231
Central 448952 000 000 448952 144800 000 18190 611942
Sub-Total 1364719 102718 41170 1508607 144800 220320 1161444 3035171
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 000 000
Central 10000 000 000 10000 000 000 000 10000
Sub-Total 10000 000 000 10000 000 000 000 10000
State 000 3250 000 3250 000 000 000 3250
Private 000 000 000 000 000 000 171 171
Central 24840 000 000 24840 8600 000 000 33440
Sub-Total 24840 3250 000 28090 8600 000 171 36861
178400 000 000 178400 45000 000 000 223400
State 1943250 79198 28788 2051236 000 1183803 52102 3287141
Private 1212450 532210 47370 1792030 000 000 3495815 5287845
Central 1422502 35958 000 1458460 332000 000 49190 1839650
Grand Total 4578202 647366 76158 5301726 332000 1183803 3597107 10414636
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
SOUTHERN REGION
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
State Ownership Sector
Modewise breakup
Grand TotalThermal RES
(MNRE)Nuclear
Hydro
(Renewable)
Kerala
Tamil Nadu
NLC
Puducherry
Central - Unallocated
Total (Southern
Region)
Andhra Pradesh
Telangana
Karnataka
File NoCEA-CH-14-1142018-Coordination Division
(As on 31102018)
Coal Gas Diesel Total
State 71000 000 000 71000 000 000 7070 78070
Private 28100 000 000 28100 000 000 25545 53645
Central 291433 000 000 291433 000 11000 000 302432
Sub-Total 390533 000 000 390533 000 11000 32615 434147
State 42000 000 000 42000 000 13000 405 55405
Private 73000 000 000 73000 000 000 3207 76207
Central 39374 000 000 39374 000 6100 000 45474
Sub-Total 154374 000 000 154374 000 19100 3612 177086
State 540000 10000 000 550000 000 98600 9195 657795
Private 242500 000 000 242500 000 000 34452 276952
Central 76077 000 000 76077 000 41000 000 117077
Sub-Total 858577 10000 000 868577 000 139600 43647 1051824
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 000 000
Central 698504 000 000 698504 000 18620 000 717124
Sub-Total 698504 000 000 698504 000 18620 000 717124
State 42000 000 000 42000 000 206192 630 248822
Private 293900 000 000 293900 000 000 21648 315548
Central 163390 000 000 163390 000 8900 1000 173290
Sub-Total 499290 000 000 499290 000 215092 23278 737660
State 000 000 000 000 000 36000 5211 41211
Private 000 000 000 000 000 39900 001 39901
Central 8703 000 000 8703 000 6400 000 15103
Sub-Total 8703 000 000 8703 000 82300 5212 96215
110183 000 000 110183 000 8501 000 118684
State 695000 10000 000 705000 000 353792 22511 1081303
Private 637500 000 000 637500 000 39900 84853 762253
Central 1387664 000 000 1387664 000 100520 1000 1489184
Grand Total 2720164 10000 000 2730164 000 494212 108364 3332740
(As on 31102018)
Coal Gas Diesel Total
State 000 32821 000 32821 000 10000 3001 45822
Private 000 2450 000 2450 000 000 1680 4130
Central 27902 43556 000 71458 000 36851 000 108309
Sub-Total 27902 78827 000 106729 000 46851 4681 158261
State 000 000 000 000 000 000 10710 10710
Private 000 000 000 000 000 000 539 539
Central 2470 4682 000 7152 000 11800 000 18952
Sub-Total 2470 4682 000 7152 000 11800 11249 30201
State 000 000 000 000 000 32200 3103 35303
Private 000 000 000 000 000 000 006 006
Central 3040 10969 000 14009 000 7446 000 21455
Sub-Total 3040 10969 000 14009 000 39646 3109 56764
State 000 16950 000 16950 000 000 1601 18551
Private 000 000 000 000 000 000 009 009
Central 3740 43695 000 47435 000 7077 500 55012
Sub-Total 3740 60645 000 64385 000 7077 2110 73572
State 000 000 3600 3600 000 000 545 4145
Private 000 000 000 000 000 000 217 217
Central 3140 7157 000 10297 000 9677 000 19974
Sub-Total 3140 7157 3600 13897 000 9677 762 24336
State 000 000 000 000 000 000 3067 3067
Private 000 000 000 000 000 000 100 100
Central 2140 4893 000 7033 000 5860 000 12893
Sub-Total 2140 4893 000 7033 000 5860 3167 16060
State 000 000 000 000 000 000 3647 3647
Private 000 000 000 000 000 000 020 020
Central 2070 4046 000 6116 000 9913 000 16029
Sub-Total 2070 4046 000 6116 000 9913 3667 19696
7500 6362 000 13862 000 14376 000 28238
State 000 49771 3600 53371 000 42200 25674 121245
Private 000 2450 000 2450 000 000 2571 5021
Central 52002 125360 000 177362 000 103000 500 280862
Grand Total 52002 177581 3600 233183 000 145200 28745 407128
Central - Unallocated
Total (Eastern
Region)
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
NORTH-EASTERN REGION
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
State Ownership Sector
Modewise breakup
Grand TotalThermalNuclear
Bihar
Jharkhand
West Bengal
DVC
Odisha
Sikkim
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
EASTERN REGION
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
Ownership Sector
Modewise breakup
Grand TotalThermalNuclear
Hydro
(Renewable)
RES
(MNRE)
Manipur
Nagaland
State
Mizoram
Central - Unallocated
Total (North-
Eastern Region)
Hydro
(Renewable)
RES
(MNRE)
Assam
Arunachal Pradesh
Meghalaya
Tripura
File NoCEA-CH-14-1142018-Coordination Division
(As on 31102018)
Coal Gas Diesel Total
State 000 000 4005 4005 000 000 525 4530
Private 000 000 000 000 000 000 146 146
Central 000 000 000 000 000 000 510 510
Sub-Total 000 000 4005 4005 000 000 1181 5186
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 075 075
Central 000 000 000 000 000 000 000 000
Sub-Total 000 000 000 000 000 000 075 075
State 000 000 4005 4005 000 000 525 4530
Private 000 000 000 000 000 000 221 221
Central 000 000 000 000 000 000 510 510
Grand Total 000 000 4005 4005 000 000 1256 5261
19
Andaman amp
Nicobar
lakshadweep
Total (Islands)
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
State Ownership Sector
Modewise breakup
Grand TotalThermalNuclear
Hydro
(Renewable)
RES
(MNRE)
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
ISLANDS
File NoCEA-CH-14-1142018-Coordination Division
SrNo Contents Page
1 Executive summary of Target and Achievement of Transmission Lines during 2018-19
20(1)
2 List of Transmission Lines CommissionedReady for commissioning during Oct-2018 20(2)
Section C - Transmission Lines
File NoCEA-CH-14-1142018-Coordination Division
Executive summary of Target and Achievement of Transmission Lines during 2018-19 As on Oct-18
(All figures in circuit kms)
Centr
al S
ecto
r
Sta
te S
ecto
r
JV
Private
Secto
r
To
tal
Centr
al S
ecto
r
Sta
te S
ecto
r
JV
Private
Secto
r
To
tal
Centr
al S
ecto
r
Sta
te S
ecto
r
JV
Private
Secto
r
To
tal
Centr
al S
ecto
r
Sta
te S
ecto
r
JV
Private
Secto
r
To
tal
Centr
al S
ecto
r
Sta
te S
ecto
r
JV
Private
Secto
r
To
tal
Cen
tral S
ecto
r
Sta
te S
ecto
r
JV
Pri
vate
Secto
r
Gra
nd
To
tal
0 0 0 0 0 0 0 0 4692 766 827 6285 3045 5906 980 9931 553 5878 0 6431 8290 12550 1807 22647
Oct18 Programme 0 0 0 0 0 0 0 0 300 0 0 300 662 90 562 1314 0 723 0 723 962 813 562 2337
Achievement 0 0 0 0 0 0 0 0 729 0 0 729 471 266 0 737 0 401 0 401 1200 667 0 1867
Upto Oct-18 Programme 0 0 0 0 0 0 0 0 3004 416 0 3420 1350 3109 562 5021 481 4346 0 4827 4835 7871 562 13268
Achievement 0 0 0 0 0 0 0 0 2286 0 178 2464 1436 1783 1595 4814 60 4461 0 4521 3782 6244 1773 11799
20(1)
220 kV Grand Total 800 kV 500 kV
Programme 2018-19
Programme
Achievement
HVDC765 kV 400 kV
File NoCEA-CH-14-1142018-Coordination Division
SlNo Line
Length
(cKM)
1 2 3 4 5 6
1 765 Jharsuguda - Dharamjaygarh line DC PGCIL 296
2 765LILO of Kurnool - Thirvualam line at
CuddapahDC PGCIL 190
3 765 Salem PS - Madhugiri PS line SC PGCIL 243
4 400 Cuddapah - Hindupur line (Q) DC PGCIL 338
5 400LILO of Both Ckt of Bamnauli - Samaypur at
TughlakabadMC PGCIL 114
6 400LILO-Out of Cuddapah - Hindupur line (Q)
(Both Ckts) at NP Kunta ssDC PGCIL 19
1200
7 400LILO of Sterlite - Meramundali at Lapanga
4oo kV ssDC OPTCL 14
8 400 Sterlite - Lapanga line DC OPTCL 37
9 400 TMDC Podili - Sattapenalli line DC APTRANSCO 215
10 230Neyveli 230110 kV ss - Eachangadu
230kV FeederSC TANTRANSCO 1
11 230 NNTPS - Neyveli 230110kV ss DC TANTRANSCO 2
12 220 Ajmer (400 kV) - Bherunda (TK) DC RVPNL 100
13 220 Aligarh - Atrauli line DC UPPTCL 77
14 220 Khandwa - Chhanera line DC MPPTCL 78
15 220LILO of one Ckt of Hadala - Sartanpar line
at Wankaner on MC towersDC GETCO 6
16 220 LILO of one Ckt of Vita - Miraj at Alkud ss DC MSETCL 27
17 220 Mendhigiri - Alkud ss DC MSETCL 110
667
1867
20(2)
Grand Total
2Transmission Lines (220 kV and above) CommissionedReady for commissioning During Oct-2018
As on 31-10-18
Voltage
Level (kV)Name of Transmission Lines
Circuit
Type
Executing
Agency
CENTRAL SECTOR
Total of CENTRAL SECTOR
STATE SECTOR Sector
Total of STATE SECTOR
File NoCEA-CH-14-1142018-Coordination Division
SN Contents Page
1 Executive summary of Target and Achievement of Substations during 2018-19 21(1)
2Sub Stations (220 kV and above) commissionedready for commisssioning during Oct-
201821(2)
Section D - Sub Stations
File NoCEA-CH-14-1142018-Coordination Division
1 Executive summary of Target and Achievement of Substations during 2018-19 As on Oct-18
(All figures in circuit MVA)
Centr
al S
ecto
r
Sta
te S
ecto
r
JV
Private
Secto
r
To
tal
Centr
al S
ecto
r
Sta
te S
ecto
r
JV
Private
Secto
r
To
tal
Centr
al S
ecto
r
Sta
te S
ecto
r
JV
Private
Secto
r
To
tal
Centr
al S
ecto
r
Sta
te S
ecto
r
JV
Private
Secto
r
To
tal
Centr
al S
ecto
r
Sta
te S
ecto
r
JV
Private
Secto
r
To
tal
Cen
tral S
ecto
r
Sta
te S
ecto
r
JV
Pri
vate
Secto
r
Gra
nd
To
tal
3000 0 0 3000 0 0 0 0 22200 0 0 22200 8185 13085 630 21900 740 14760 0 15500 34125 27845 630 62600
Oct18 Programme 0 0 0 0 0 0 0 0 0 0 0 0 1000 1260 630 2890 0 1400 0 1400 1000 2660 630 4290
Achievement 0 0 0 0 0 0 0 0 3000 0 0 3000 1500 3120 0 4620 0 2220 0 2220 4500 5340 0 9840
Upto Oct-18 Programme 0 0 0 0 0 0 0 0 10000 0 0 10000 6130 7435 630 14195 0 9670 0 9670 16130 17105 630 33865
Achievement 0 0 0 0 0 0 0 0 14000 0 0 14000 9000 7550 630 17180 0 10610 0 10610 23000 18160 630 41790
21(1)
220 kV Grand Total 800 kV 500 kV
Programme 2018-19
Programme
Achievement
HVDC765 kV 400 kV
File NoCEA-CH-14-1142018-Coordination Division
As on 31-10-18
Sl Voltage Ratio Capacity
No (kVkV) (MWMVA)
1 2 3 4 5
1 Cuddapah Ss 765400 PGCIL 3000
2 Tughlakabad SS (GIS) 400220 PGCIL 1500
Total of CENTRAL SECTOR 4500
3 Panki Kanpur (Aug) TF-I 400200 UPPTCL 75
4 Hindupur ss (1st ICT) 400220 APTRANSCO 315
5 Thappagundu ss 400110 TANTRANSCO 600
6 Mendhasal (2nd power TF) 400220 OPTCL 20
7 Jodhpur ss (New) 400220 RVPNL 315
8 Shankarpally 400220 TSTRANSCO 500
9 Podili ss (1st ICT) 400220 APTRANSCO 315
10 Doni (Gadag)SS 400220 KPTCL 1000
11 Porur (Addl TF) 230110 TANTRANSCO 100
12 Anuppankulam (Addl TF) 230110 TANTRANSCO 60
13 Neyveli SS 230110 TANTRANSCO 480
14 Savarkundla (Aug) 22066 GETCO 60
15 Bhuna (Aug) 220132 HVPNL 100
16 Madanpur (Aug) 22066 HVPNL 100
17 Gurgaon Sec-52A (Aug) 22066 HVPNL 160
18 IA Hisar (Aug) 220132 HVPNL 50
19 Narwana (Aug) 220132 HVPNL 60
20 Therubali (3rd Auto TF) 220132 OPTCL 160
21 Halasar ss 220132 RVPNL 160
22 Bansi Siddaharthnagar (Aug) TF-I 220132 UPPTCL 60
23 Hata Kushinagar (New) TF-I 220132 UPPTCL 100
24 Gomti nagar Lucknow (Aug) TF-IV 22033 UPPTCL 60
25 Kanpur Road Lucknow (New) TF-III 22033 UPPTCL 60
26 Asoj (Aug) 22066 GETCO 150
27 Kangasiyali (Aug) 22066 GETCO 60
28 Karmsad (Aug) 22066 GETCO 160
29 Lalpar (Aug) 22066 GETCO 60
TOTAL STATE SECTOR 5340
GRAND TOTAL 9840
21(2)
PRIVATE SECTOR
CENTRAL SECTOR
STATE SECTOR
2Sub-Stations (220 kV and above) CommissionedReady for commissioning During Oct-2018
Name of Sub StationsExecuting
Agency
File NoCEA-CH-14-1142018-Coordination Division
SN Contents Page
1 Electricity Generation (MU) Targets and Achievements for 2018-19 22
Section E - Electricity Generation
File NoCEA-CH-14-1142018-Coordination Division
Programme Achievement Ach Programme Achievement Ach
Central Sector 35160700 3028100 3162321 10443 20144400 21150469 10499
State Sector 35132000 3010000 3017260 10024 19922100 19549030 9813
PvtIPP Sector 36999700 3240600 3375603 10417 21598300 20794155 9628
PvtUTL Sector 1857600 164500 180597 10979 1130900 1203107 10638
Total 109150000 9443200 9735781 10310 62795700 62696761 9984
Central Sector 5617600 420900 451004 10715 4193000 4045436 9648
State Sector 6110600 559500 708469 12663 4049400 4433000 10947
PvtIPP Sector 1141800 80500 90122 11195 976400 1021963 10467
PvtUTL Sector 130000 11300 12564 11119 76700 99943 13030
Total 13000000 1072200 1262159 11772 9295500 9600342 10328
Central Sector 3850000 353300 303310 8585 2068900 2203540 10651
Total 3850000 353300 303310 8585 2068900 2203540 10651
Bhutan Import 500000 63300 35395 5592 347000 416660 12007
Central Sector 44628300 3802300 3916635 10301 26406300 27399445 10376
State Sector 41242600 3569500 3725729 10438 23971500 23982030 10004
Pvt Sector 40129100 3496900 3658886 10463 23782300 23119168 9721
Total 126500000 10932000 11336645 10370 74507100 74917303 10055
Provisional based on actual-cum-Assesment
Figs in MU
Cummulative
Achievement
Cummulative
Achievement
Sep-18 Sep-17 Upto Sep-2018 Upto Sep-2017
1073794 748889 7332680 5660929
22
Renewable Energy Generation
Achievement
Oct-2018
1 Electricity Generation (MU) Targets and Achievememts for 2018-19
All India Energy Generation During April 2018- Oct 2018 (MU)
Target (2018-19)April 2018- Oct 2018
Sector
Hydro
Thermal
Nuclear
627957
92955
20689
745071
626968
96003
22035
749173
0
100000
200000
300000
400000
500000
600000
700000
800000
Thermal Hydro Nuclear Total
Programme
Achievement
File NoCEA-CH-14-1142018-Coordination Division
SN Contents Page
1 Energy Power Supply Position (Provisional) for Oct-2018 and during April 2018- Oct 2018 23
2 Peak Power Supply Position (Provisional) for Oct-2018 and during April 2018- Oct 2018 24
3 Energy Power Supply Position (Revised) for Sep-2018 and during April 2018- Sept 2018 25
4 Peak Power Supply Position (Revised) for Sep-2018 and during April 2018- Sept 2018 26
5 Notified Power cuts Restrictions on Industries during Oct-2018 27
6 Power Supply to Agricultural Sector during Oct-2018 28
Section F - Power supply position
File NoCEA-CH-14-1142018-Coordination Division
आकड़ मममलयन यननट नट Figures in MU net
ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied
कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )
चडीगढ़ Chandigarh 108 108 0 00 1055 1055 0 00
दिलली Delhi 2490 2489 1 00 22524 22510 14 01
हरियजणज Haryana 4554 4554 0 00 35205 35205 0 00
दहमजचल परिश Himachal Pradesh 788 787 2 02 5728 5560 168 29
रमम कशमीि Jammu amp Kashmir 1497 1219 278 186 10982 8865 2117 193
परजब Punjab 4418 4418 0 00 38832 38819 13 00
िजरसथजन Rajasthan 6748 6748 0 00 45341 45181 160 04
उतति परिश Uttar Pradesh 10136 9973 164 16 75485 74808 676 09
उततिजखड Uttarakhand 1083 1081 3 03 8395 8310 85 10
उततरी कषतर Northern Region 31822 31375 447 14 243547 240314 3233 13
छततीसगढ़ Chhattisgarh 2454 2453 1 00 16119 16091 28 02
गरिजत Gujarat 11636 11636 0 00 70782 70768 14 00
मधय परिश Madhya Pradesh 5860 5859 1 00 38412 38410 2 00
महजिजषटर Maharashtra 15223 15095 128 08 95489 95355 134 01
िमन औि दिउ Daman amp Diu 216 216 0 00 1523 1523 0 00
िजिि व नगि हवली Dadra amp Nagar Haveli 553 553 0 00 3757 3757 0 00
गोवज Goa 366 366 0 00 2497 2495 2 01
पशचिमी कषतर Western Region 36308 36178 130 04 228579 228398 180 01
आनधर परिश Andhra Pradesh 5860 5854 6 01 37377 37334 43 01
तलगजनज Telangana 6748 6742 6 01 38251 38205 46 01
कनजाटक Karnataka 5842 5835 7 01 39111 39059 52 01
किल Kerala 2116 2096 20 09 14256 14160 96 07
तममल नजड Tamil Nadu 8611 8601 10 01 65742 65666 76 01
पडचिी Puducherry 216 215 1 05 1654 1646 8 05
लकष-दवीप Lakshadweep 4 4 0 0 27 27 0 0
दकषकषणी कषतर Southern Region 29392 29342 50 02 196390 196069 321 02
बबहजि Bihar 2742 2738 4 01 19143 18951 192 10
िजमोिि घजटी ननगम DVC 1712 1698 13 08 13096 12828 268 20
झजिखणड Jharkhand 701 697 4 06 5022 4949 73 15
ओडडशज Odisha 3147 3134 13 04 20224 20192 32 02
पशशचम बगजल West Bengal 4204 4200 4 01 33008 32881 127 04
मसशककम Sikkim 40 40 0 00 279 279 0 01
अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 67 202 188 13 67
परवी कषतर Eastern Region 12547 12507 40 03 90772 90080 692 08
अरणजचल परिश Arunachal Pradesh 67 66 1 09 502 496 7 13
असम Assam 833 809 24 29 6153 5903 250 41
मणणपि Manipur 72 71 1 10 485 478 7 14
मघजलय Meghalaya 147 147 0 00 1043 1042 0 00
ममज़ोिम Mizoram 63 62 1 08 365 359 5 14
नजगजलड Nagaland 76 67 8 110 540 481 59 109
बिपिज Tripura 130 129 1 09 1025 1007 19 18
उततर-परवी कषतर North-Eastern Region 1387 1351 35 25 10113 9766 346 34
समपणण भारत All India 111455 110753 702 06 769399 764627 4773 06
23
ऊराण वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Energy Power Supply Position Report (Provisional)
राजयStateअकरबर2018 October2018 अपरल2018 -अकरबर2018 April2018 to October2018
ऊरजा पनत ा म कमी ऊरजा पनत ा म कमीEnergy not Supplied
Excludes energy exported to Bangladesh
Energy not Supplied
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
File NoCEA-CH-14-1142018-Coordination Division
अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met
कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )
चडीगढ़ Chandigarh 217 217 0 00 369 369 0 00
दिलली Delhi 4713 4713 0 00 7016 7016 0 00
हरियजणज Haryana 7948 7948 0 00 10270 10270 0 00
दहमजचल परिश Himachal Pradesh 1520 1520 0 00 1520 1520 0 00
रमम कशमीि Jammu amp Kashmir 2836 2269 567 200 2951 2361 590 200
परजब Punjab 7979 7979 0 00 12638 12638 0 00
िजरसथजन Rajasthan 11450 11450 0 00 11698 11698 0 00
उतति परिश Uttar Pradesh 17434 16745 688 39 20498 20062 436 21
उततिजखड Uttarakhand 1943 1943 0 00 2143 2143 0 00
उततरी कषतर Northern Region 50659 49635 1024 20 63166 61726 1440 23
छततीसगढ़ Chhattisgarh 4414 4268 146 33 4414 4268 146 33
गरिजत Gujarat 18148 18130 19 01 18148 18130 19 01
मधय परिश Madhya Pradesh 11356 11317 39 03 11356 11317 39 03
महजिजषटर Maharashtra 23864 23159 705 30 23864 23254 610 26
िमन औि दिउ Daman amp Diu 342 341 1 02 357 356 1 02
िजिि व नगि हवली Dadra amp Nagar Haveli 784 780 4 05 816 815 1 01
गोवज Goa 536 536 0 00 596 596 0 00
पशचिमी कषतर Western Region 56548 55695 853 15 56548 55695 853 15
आनधर परिश Andhra Pradesh 9435 9435 0 00 9435 9435 0 00
तलगजनज Telangana 10603 10603 0 00 10815 10815 0 00
कनजाटक Karnataka 10741 10741 0 00 10741 10741 0 00
किल Kerala 3727 3644 83 22 4050 3997 53 13
तममल नजड Tamil Nadu 14747 14333 414 28 15029 14981 47 03
पडचिी Puducherry 363 362 1 03 420 400 19 46
लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0
दकषकषणी कषतर Southern Region 45279 45226 53 01 45946 45684 262 06
बबहजि Bihar 4945 4945 0 00 5050 5045 5 01
िजमोिि घजटी ननगम DVC 2729 2729 0 00 2874 2874 0 00
झजिखणड Jharkhand 1260 1260 0 00 1339 1284 55 41
ओडडशज Odisha 5624 5224 400 71 5624 5357 268 48
पशशचम बगजल West Bengal 8775 8775 0 00 9130 9123 7 01
मसशककम Sikkim 86 86 0 00 90 90 0 00
अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7
परवी कषतर Eastern Region 22959 22567 392 17 22959 22567 392 17
अरणजचल परिश Arunachal Pradesh 138 125 13 94 138 133 5 37
असम Assam 1785 1704 81 45 1865 1809 56 30
मणणपि Manipur 187 185 2 11 193 186 7 36
मघजलय Meghalaya 336 336 0 00 371 368 2 07
ममज़ोिम Mizoram 99 97 2 20 103 98 4 41
नजगजलड Nagaland 134 131 3 22 156 138 18 117
बिपिज Tripura 269 269 0 00 298 293 5 17
उततर-परवी कषतर North-Eastern Region 2790 2700 90 32 2967 2850 117 39
समपणण भारत All India 172945 170604 2341 14 177022 175528 1494 08
24
अधिकतम वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Peak Power Supply Position Report (Provisional)
आकड़ मगज वजट नट Figures in MW netअपरल2018 -अकरबर2018 April2018 to October2018
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
मजग की पनता म कमी Demand not Met
Excludes the supply to Bangladesh
राजयStateअकरबर2018 October2018
मजग की पनता म कमी Demand not Met
File NoCEA-CH-14-1142018-Coordination Division
आकड़ मममलयन यननट नट Figures in MU net
ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied
कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )
चडीगढ़ Chandigarh 141 141 0 00 947 947 0 00
दिलली Delhi 2925 2924 1 00 20034 20021 13 01
हरियजणज Haryana 4794 4794 0 00 30651 30651 0 00
दहमजचल परिश Himachal Pradesh 876 853 24 27 4940 4773 167 34
रमम कशमीि Jammu amp Kashmir 1520 1246 274 180 9485 7646 1839 194
परजब Punjab 5575 5575 0 00 34414 34401 13 00
िजरसथजन Rajasthan 6202 6201 0 00 38594 38434 160 04
उतति परिश Uttar Pradesh 10211 10124 86 08 65349 64836 513 08
उततिजखड Uttarakhand 1162 1149 13 11 7311 7229 82 11
उततरी कषतर Northern Region 33405 33008 398 12 211725 208939 2786 13
छततीसगढ़ Chhattisgarh 2403 2388 15 06 13665 13638 27 02
गरिजत Gujarat 10122 10122 0 00 59146 59132 14 00
मधय परिश Madhya Pradesh 5492 5491 1 00 32552 32551 1 00
महजिजषटर Maharashtra 13615 13612 3 00 80266 80260 6 00
िमन औि दिउ Daman amp Diu 221 221 0 00 1306 1306 0 00
िजिि व नगि हवली Dadra amp Nagar Haveli 551 551 0 00 3204 3204 0 00
गोवज Goa 339 339 0 00 2131 2128 2 01
पशचिमी कषतर Western Region 32742 32723 19 01 192270 192220 50 00
आनधर परिश Andhra Pradesh 5294 5287 7 01 31518 31480 37 01
तलगजनज Telangana 6279 6272 8 01 31503 31463 40 01
कनजाटक Karnataka 5701 5693 8 01 33269 33225 45 01
किल Kerala 2050 2026 24 12 12140 12063 76 06
तममल नजड Tamil Nadu 8971 8959 12 01 57131 57065 66 01
पडचिी Puducherry 226 224 2 08 1438 1431 7 05
लकष-दवीप Lakshadweep 4 4 0 0 23 23 0 0
दकषकषणी कषतर Southern Region 28520 28460 60 02 166998 166727 271 02
बबहजि Bihar 2839 2793 46 16 16400 16213 188 11
िजमोिि घजटी ननगम DVC 1901 1750 151 79 11384 11130 254 22
झजिखणड Jharkhand 740 723 17 22 4321 4252 69 16
ओडडशज Odisha 2921 2918 3 01 17077 17058 19 01
पशशचम बगजल West Bengal 4902 4879 23 05 28804 28681 123 04
मसशककम Sikkim 39 39 0 01 239 239 0 01
अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 67 173 162 12 67
परवी कषतर Eastern Region 13341 13102 240 18 78225 77573 652 08
अरणजचल परिश Arunachal Pradesh 74 73 1 10 435 429 6 14
असम Assam 950 914 36 38 5320 5094 226 43
मणणपि Manipur 70 69 1 11 414 408 6 15
मघजलय Meghalaya 150 150 0 01 896 896 0 01
ममज़ोिम Mizoram 58 57 1 12 302 297 5 16
नजगजलड Nagaland 80 72 8 104 464 414 50 108
बिपिज Tripura 192 191 1 07 895 878 17 19
उततर-परवी कषतर North-Eastern Region 1575 1527 48 31 8726 8415 311 36
समपणण भारत All India 109584 108819 765 07 657944 653873 4071 06
Energy not Supplied Energy not Supplied
ससतबर2018 September2018 अपरल2018 -ससतबर2018 April2018 to September2018
ऊरजा पनत ा म कमी ऊरजा पनत ा म कमी
Excludes energy exported to Bangladesh
राजयState
ऊराण वरवदयत आपरतण शथिरत ररपोरण (सशोधित) Energy Power Supply Position Report (Revised)
25
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
File NoCEA-CH-14-1142018-Coordination Division
अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met
कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )
चडीगढ़ Chandigarh 293 293 0 00 369 369 0 00
दिलली Delhi 5358 5358 0 00 7016 7016 0 00
हरियजणज Haryana 9008 9008 0 00 10270 10270 0 00
दहमजचल परिश Himachal Pradesh 1466 1466 0 00 1479 1479 0 00
रमम कशमीि Jammu amp Kashmir 2951 2361 590 200 2951 2361 590 200
परजब Punjab 11405 11405 0 00 12638 12638 0 00
िजरसथजन Rajasthan 10612 10612 0 00 11698 11698 0 00
उतति परिश Uttar Pradesh 18346 18121 225 12 20498 20062 436 21
उततिजखड Uttarakhand 1996 1996 0 00 2143 2143 0 00
उततरी कषतर Northern Region 56407 55649 758 13 63166 61726 1440 23
छततीसगढ़ Chhattisgarh 4404 4075 328 75 4404 4136 268 61
गरिजत Gujarat 16963 16963 0 00 17053 16963 90 05
मधय परिश Madhya Pradesh 8811 8771 41 05 8811 8775 36 04
महजिजषटर Maharashtra 22455 22349 106 05 23395 23254 141 06
िमन औि दिउ Daman amp Diu 357 356 1 02 357 356 1 02
िजिि व नगि हवली Dadra amp Nagar Haveli 816 815 1 01 816 815 1 01
गोवज Goa 596 596 0 00 596 596 0 00
पशचिमी कषतर Western Region 52933 52895 38 01 53841 52895 945 18
आनधर परिश Andhra Pradesh 9435 9416 19 02 9435 9416 19 02
तलगजनज Telangana 10815 10815 0 00 10815 10815 0 00
कनजाटक Karnataka 10103 10090 13 01 10690 10688 2 00
किल Kerala 3888 3638 251 64 4050 3997 53 13
तममल नजड Tamil Nadu 14556 14553 3 00 15029 14981 47 03
पडचिी Puducherry 390 372 17 45 420 400 19 46
लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0
दकषकषणी कषतर Southern Region 45542 45428 114 02 45946 45684 262 06
बबहजि Bihar 5050 5045 5 01 5050 5045 5 01
िजमोिि घजटी ननगम DVC 2641 2641 0 00 2874 2874 0 00
झजिखणड Jharkhand 1233 1233 0 00 1339 1284 55 41
ओडडशज Odisha 4906 4906 0 00 5357 5357 0 00
पशशचम बगजल West Bengal 8644 8639 5 01 9130 9123 7 01
मसशककम Sikkim 78 78 0 00 90 90 0 00
अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7
परवी कषतर Eastern Region 22110 22100 10 00 22470 22290 180 08
अरणजचल परिश Arunachal Pradesh 132 130 2 15 138 133 5 37
असम Assam 1865 1809 56 30 1865 1809 56 30
मणणपि Manipur 184 182 2 13 193 186 7 36
मघजलय Meghalaya 317 317 0 00 371 368 2 07
ममज़ोिम Mizoram 95 93 2 23 103 98 4 41
नजगजलड Nagaland 142 138 5 32 156 138 18 117
बिपिज Tripura 296 293 3 10 298 293 5 17
उततर-परवी कषतर North-Eastern Region 2921 2850 71 24 2967 2850 117 39
समपणण भारत All India 177022 175528 1494 08 177022 175528 1494 08
26
मजग की पनता म कमी मजग की पनता म कमी Demand not MetDemand not Met
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
Excludes the supply to Bangladesh
अधिकतम वरवदयत आपरतण शथिरत ररपोरण (सशोधित) Peak Power Supply Position Report (Revised)
आकड़ मगज वजट नट Figures in MW net
राजयStateससतबर2018 September2018 अपरल2018 -ससतबर2018 April2018 to September2018
File NoCEA-CH-14-1142018-Coordination Division
अकरबर2018 October2018अपरल2018 -अकरबर2018 April2018 to October2018
उततरी कषतर Northern Region
चडीगढ़ Chandigarh Data not received Data not received
दिलली Delhi
हरियजणज Haryana
दहमजचल परिश Himachal Pradesh
रमम कशमीि Jammu amp Kashmir Data not received Data not received
परजब Punjab
िजरसथजन Rajasthanउतति परिश Uttar Pradesh
उततिजखड Uttarakhand
पशचिमी कषतर Western Region
छततीसगढ़ Chhattisgarh
गरिजत Gujarat
मधय परिश Madhya Pradesh
महजिजषटर Maharashtra
गोवज Goa
दकषकषणी कषतर Southern Region
आनधर परिश Andhra Pradesh
तलगजनज Telangana
कनजाटक Karnataka
किल Kerala
तममल नजड Tamil Nadu
पडचिी Puducherryपरवी कषतर Eastern Region
बबहजि Bihar
झजिखणड Jharkhand
ओडडशज Odisha
पशशचम बगजल West Bengal
N
o No
tified
Cuts
N
o No
tified
Cuts
27
अकरबर 2018 म इडथरीर पर वरवदयत करौती का वरवरवरण Notified Power CutsRestrictions on Industries during October2018
राजय कषतर State Regionऊराणमाग करौती EnergyDemand Cut
No Notified Cuts No Notified Cuts
File NoCEA-CH-14-1142018-Coordination Division
अकरबर2018 October2018अपरल2018 -अकरबर2018 April2018 to October2018
उततरी कषतर Northern Region
चडीगढ़ Chandigarh Data not received Data not received
दिलली Delhi Data not received Data not received
हरियजणज Haryana 940 hrsday 0709 - 0950 hrsday
दहमजचल परिश Himachal Pradesh No cut imposed on agriculture consumers and uninterrupted
power is being supplied to agriculture sector
HPSEBL has only 2 agriculture consumers and uninterrupted
power is being supplied to agriculture sector
रमम कशमीि Jammu amp Kashmir Data not received Data not received
परजब Punjab 0507 hrsday 0349 - 0844 hrsday
िजरसथजन Rajasthan 0630 hrsday 0630 hrsday
उतति परिश Uttar Pradesh 1825 hrsday 1814 - 1858 hrsday
उततिजखड Uttarakhand 2350 hrsday 2128 - 2357 hrsday
पशचिमी कषतर Western Region
छततीसगढ़ Chhattisgarh 18hoursday 18 hrsday
गरिजत Gujarat 805 hrsday 805 hrsday
मधय परिश Madhya Pradesh Three-Phase Supply(Irrigation)-947 hrs day
Three-Phase (Mixed) Supply - 2311 hrs day
Three-Phase Supply(Irrigation)- 0933 - 0947 hrs day Three-
Phase (Mixed) Supply - 2300 - 2320 hrs day
महजिजषटर Maharashtra Three-Phase Supply(Irrigation)- 9 hrs day
Three-Phase (Mixed) Supply - 24 hrs day
Three-Phase Supply(Irrigation)- 9 hrs day
Three-Phase (Mixed) Supply - 24 hrs day
गोवज Goa No restriction No restriction
दकषकषणी कषतर Southern Region
आनधर परिश Andhra Pradesh 07 hrsday 07 hrsday
तलगजनज Telangana 24 hoursday 24 hoursday
कनजाटक Karnataka 6 hrsday 6 hrsday
किल Kerala No Restrictions No Restrictions
तममल नजड Tamil Nadu 9 hrsday (6 hrs during day time and 3 hrs during night time) 9 hrsday (6 hrs during day time and 3 hrs during night time)
पडचिी Puducherry No Restrictions No Restrictions
परवी कषतर Eastern Region
बबहजि Bihar About 18 hrsday About 18 hrsday
झजिखणड Jharkhand About 20 hrsday About 20 hrsday
ओडडशज Odisha 24 hrsday 24 hrsday
पशशचम बगजल West Bengal About 23 hrsday About 23 hrsday
28
अकटबर 2018 कषि कषतर को षिदयत आपरति का षििरण Power Supply to Agricultural Sector during October2018
राजय कषतर State Regionऔसत वरवदयत आपरतण घनरो म Average Hours of Supply
On segregated feeders
File NoCEA-CH-14-1142018-Coordination Division
SNo Contents Page
1 Growth of Installed Capacity since 6th Plan 29
2 Progress of Transmission Sector since 6th Plan 30
3 All India Yearly Coal consumption for Power Generation (Utilities)
4 All India Annual Per Capita Consumption of Electricity since -2006
5 Average cost of power supply amp Average realisation (Paisakwh)
6 Growth of Rural Electrification amp Pump Sets Energisation
7 Status of Hydro Schemes Cleared by the CEA in Oct-2018
Section G - Growth of Power Sector
31
32
File NoCEA-CH-14-1142018-Coordination Division
(In MW)
Coal Gas Diesel Total
End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472
End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634
End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537
End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596
End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921
End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703
End of 12th Plan 19216288 2532938 83763 21832988 6780 4447842 50018 31960630
Up to Oct-2018 19599250 2493722 837629 22176734 6780 4548742 7201281 34604757
Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-17) = 51529 MW
Electricity Generation (MU) Targets and Achievements for 2016-17
Coal Gas Diesel Nuclear Hydro Res Total
1959925 2493722 837629 678000 454874 72012805 22925174
29
1 Growth of Installed Capacity Since 6th Plan
Plan YearThermal
Nuclear Hydro RES (MNRE) Total
Total Installed Capacity 34604757 MW
Coal Gas Diesel Nuclear Hydro Res
File NoCEA-CH-14-1142018-Coordination Division
Progress of Transmission Sector in the Country up to Oct 2018
1 TRANSMISSION LINES (All fig in CKM)
At the end of
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
6th plan 0 0 0 0 0 0 0 0 0 0 0 0 1831 4198 0 6029 1641 44364 0 46005 3472 48562 0 52034
7th plan 0 0 0 0 0 0 0 0 0 0 0 0 13068 6756 0 19824 4560 55071 0 59631 17628 61827 0 79455
8th plan 0 0 0 0 1634 0 0 1634 0 0 0 0 23001 13141 0 36142 6564 73036 0 79600 31199 86177 0 117376
9th plan 0 0 0 0 3234 1504 0 4738 751 409 0 1160 29345 20033 0 49378 8687 88306 0 96993 42017 110252 0 152269
10th plan 0 0 0 0 4368 1504 0 5872 1775 409 0 2184 48708 24730 0 73438 9444 105185 0 114629 64295 131828 0 196123
11th Plan 0 0 0 0 5948 1504 1980 9432 4839 411 0 5250 71023 30191 5605 106819 10140 125010 830 135980 91950 157116 8415 257481
12th Plan 6124 0 0 6124 5948 1504 1980 9432 25465 1177 4598 31240 92482 48240 17065 157787 11014 151276 978 163268 141033 202197 24621 367851
13th Plan (Up
to Mar2018)6124 0 0 6124 5948 1504 1980 9432 28666 1512 4881 35059 98247 54286 19067 171600 11258 156497 1000 168755 150243 213799 26928 390970
13th Plan (Up
to Sep-18)6124 0 0 6124 5948 1504 1980 9432 30952 1512 5059 37523 99683 56069 20662 176414 11318 160958 1000 173276 154025 220043 28701 402769
27150
75050
47900
118050
90650
30
IR addition in 12th Plan (up to
March 2017)
Total IR (up to Oct-18)
IR at the end of 11th Plan
IR at the end of 12th Plan
Envisaged IR Capacity at the end
of 13th Plan
Grand Total
Note - The figure upto the end of 10th plan in for stringing progress including the lines not commissioned Now only commissioned lines are reckoned Accordingly the figure for 10th plan (end) may read as 187555 after adjusting with (-) 10852 Ckm
Inter-regional Power Transfer Capacity
plusmn 800 kV HVDC plusmn 500 kV HVDC 765 kV 400 kV 220 kV
File NoCEA-CH-14-1142018-Coordination Division
2004-05 27800
2005-06 28100
2006-07 30200
2007-08 33000
2008-09 35500
2009-10 36700
2010-11 38700
2011-12 41756
2012-13 45460
2013-14 48940
2014-15 53040
2015-16 54590
2016-17 57430
2017-18 60800
Year
2005-06
2006-07
2007-08
2008-09
2009-10
2010-11
2011-12
2012-13
2013-14
2014-15
2015-16
2016-17
2017-18
2004-05 254 209 7568
2005-06 260 221 7636
2006-07 276 227 7423
2007-08 293 239 7727
2008-09 340 263 8713
2009-10 355 268 8870
2010-11 398 303 11975
2011-12 455 330 13514
2012-13 501 376 14867
2013-14 518 175
2014-15 520
6719
7171
3 All India yearly Coal Consumption for Power Generation (Utilities)
YEARCoal Consumption
Million Tonnes
4 All India Annual per Capita consumption of Electricity Since 2006
Per Capita Consumption ( kWh)
6314
(GrossGen+ Net Import) Mid-year population
5 Average cost of power supply amp average realization ( paiseKWH )
Yearcost of supply
(paiseunit)
Realization(paiseunit)
Including AgricultureOnly
Agriculture
1149
7335
7786
91441
8188
88363
957
1010
1075
1122
File NoCEA-CH-14-1142018-Coordination Division
Source- PFC Reports on the performance of State Power Utilities 31
File NoCEA-CH-14-1142018-Coordination Division
Sl
NoExecuting Agency
Installed
Capacity (MW)Cost (Rs crore)
Date of
Clearance
32
No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification
since 2004-05
65291374575 296361511th Plan
Cumu upto End of 11th Plan
596556 21212860
557439Cummulative up to end of 12th Plan
46708
18423975
499150
2003-042004-05
5743
9769
Cumu upto End of 10th Plan
010407 to 310308
010410 to 310311557976840909
010411 to 310312
412667
86293726
3207
482864
12632
1576036
4451722594
15455554
2314176
397343611750
2093311060316074
65109527813884
6 Growth Of Rural Electrification amp Pumpsets Energisation
Plan Year
9th Plan2002-03
134092626
4111
Pump Sets Energised Villages Electricfied (Nos)
2001-02
284064367244
1218
27801997-981998-991999-002000-01
297594
010408 to 310309010409 to 310310
10th Plan
2005-062006-07
322968331020
Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as
Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received
from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made
available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified
villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is
independent of the earlier published reports
No Hydro Electric Project has been issued concurrenceAppraisal letter by CEA during October 2018
7 Status of Hydro Schemes Cleared by the CEA in Oct-2018
Name of Scheme
File NoCEA-CH-14-1142018-Coordination Division
SN Contents Page
1 Rate of sale of power for the year 2016-17 33-41
RATE OF SALE OF POWER FOR THE YEAR 2016-17
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) NORTHERN REGION
CENTRAL SECTOR
BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 18000 66900 19800
CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 54000 222400 21600
CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 30000 144400 19600
CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 23100 91700 42600
PARBATI - III HPS NHPC LTD HYDRO-HYDRO 52000 68200 54800
DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 28000 95600 30000
CHUTAK NHPC LTD HYDRO-HYDRO 4400 22000 79800
DULHASTI HPS NHPC LTD HYDRO-HYDRO 39000 228000 56400
SALAL HPS NHPC LTD HYDRO-HYDRO 69000 342300 11000
TANAKPUR HPS NHPC LTD HYDRO-HYDRO 9420 43000 29600
URI HPS -I NHPC LTD HYDRO-HYDRO 48000 280300 16000
URI HPS - II NHPC LTD HYDRO-HYDRO 24000 147300 48600
NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 4500 24600 88200
SEWA - II NHPC LTD HYDRO-HYDRO 12000 47100 43400
ANTA CCPP NTPC LTD THERMAL-GASN 41930 67539 32400
AURAIYA CCPP NTPC LTD THERMAL-GASN 66336 53501 39100
BADARPUR TPS NTPC LTD THERMAL-COAL 70500 159153 44800
DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 84000 296170 42300
DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 98000 526686 46300
DADRI CCPP NTPC LTD THERMAL-GASHSD 82978 227469 33000
FARIDABAD CCPP NTPC LTD THERMAL-GASN 43159 115577 30800
RIHAND STPS I NTPC LTD THERMAL-COAL 100000 596766 24500
RIHAND STPS II NTPC LTD THERMAL-COAL 100000 737069 24600
RIHAND STPS III NTPC LTD THERMAL-COAL 100000 706546 30600
SINGRAULI STPS NTPC LTD THERMAL-COAL 200000 1394068 20400
TANDA TPS NTPC LTD THERMAL-COAL 44000 295438 40800
UNCHAHAR TPS I NTPC LTD THERMAL-COAL 42000 256454 39800
UNCHAHAR TPS II NTPC LTD THERMAL-COAL 42000 273577 38900
UNCHAHAR TPS III NTPC LTD THERMAL-COAL 21000 142780 43000
KOLDAM NTPC LTD HYDRO-HYDRO 80000 363260 43600
NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 303575 25841
RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 108000 668677 35374
NJHPS SJVNL HYDRO-HYDRO 150000 699496 23820
RAMPUR HPS SJVNL HYDRO-HYDRO 41202 195982 32260
TEHRI HPP THDC HYDRO-HYDRO 100000 272543 51800
KOTESHWAR HEP THDC HYDRO-HYDRO 40000 106244 53400
IGSTPS JHAJJAR ARAVALI P CPL THERMAL-COAL 150000 510429 49490
NEYVELI BARSINGSAR NEYVELI LIG CORP LTD THERMAL-LIG 25000 127520 38040
STATE SECTOR
PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 21000 14222 48200
PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 21000 19205 48400
PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 25000 102257 42600
PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 25000 62107 41800
DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 60000 312213 41000
RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 120000 35767442200
WYC HYDEL STATION HPGCL HYDRO-HYDRO 6240 20365 24900
GIRI POWER HOUSE HPSEB HYDRO-HYDRO 6000 13958 7600
ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 1695 5467 11900
BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 12000 18528 6700
GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 2250 7462 22500
BASSI POWER HOUSE HPSEB HYDRO-HYDRO 6600 29649 7500
BINWA POWER HOUSE HPSEB HYDRO-HYDRO 600 2749 19300
ANNEXURE-I
RATE OF SALE OF POWER FOR THE YEAR 2016-2017
Page 33
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) GAJ POWER HOUSE HPSEB HYDRO-HYDRO 1050 2914 26700
BANER POWER HOUSE HPSEB HYDRO-HYDRO 1200 2864 16200
HOLI POWER HOUSE HPSEB HYDRO-HYDRO 300 616 22500
THIROT POWER HOUSE HPSEB HYDRO-HYDRO 450 1126 22500
KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 1200 3064 22500
LARJI POWER HOUSE HPSEB HYDRO-HYDRO 12600 53677 23700
NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 250 750 31000
CHABA POWER HOUSE HPSEB HYDRO-HYDRO 175 465 23300
RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 150 101 13400
SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 200 000 22500
KILLAR HPSEB HYDRO-HYDRO 030 050 22500
BHABA AUGUMENP H HPSEB HYDRO-HYDRO 450 1276 22500
BS CHAMBA HPSEB HYDRO-HYDRO 045 099 19500
GUMMA HPSEB HYDRO-HYDRO 300 423 22500
GAS TURBINE POWER STATION IPGCL THERMAL-GAS 27000 67233 39300
PPS-I PPCL THERMAL-GAS 33000 175905 38300
PPS-III PPCL THERMAL-GAS 137120 196879 36100
LOWER JHELUM JampKPDD HYDRO-HYDRO 10500 60214 5100
UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 2260 10514 6300
UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 10500 44202 8500
GANDHARBAL JampKPDD HYDRO-HYDRO 1500 8925 4700
KARNAH MPH JampKPDD HYDRO-HYDRO 200 1122 31000
CHENANI I JampKPDD HYDRO-HYDRO 2330 10892 6600
CHENANI II JampKPDD HYDRO-HYDRO 200 1188 9300
CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 750 3634 14200
IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 375 2108 18500
IGO MERCHELLONG JampKPDD HYDRO-HYDRO 300 1572 29700
PAHALGAM MHP JampKPDD HYDRO-HYDRO 450 1713 32900
MARPACHOO JampKPDD HYDRO-HYDRO 075 375 29800
HAFTAL JampKPDD HYDRO-HYDRO 100 483 28700
SANJAK JampKPDD HYDRO-HYDRO 126 441 36000
SEWA-III JampKPDD HYDRO-HYDRO 900 3273 20200
BHADERWAH JampKPDD HYDRO-HYDRO 150 935 8900
BAZGO JampKPDD HYDRO-HYDRO 030 108 33300
SUMOOR JampKPDD HYDRO-HYDRO 010 045 35400
HUNDER JampKPDD HYDRO-HYDRO 040 176 26200
STAKNA JampKPDD HYDRO-HYDRO 400 1933 4100
KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 124000 662879 31360
SURATGARH TPS RRVUNL THERMAL-COAL 150000 402328 41730
CHHABRA TPS 1amp 2 RRVUNL THERMAL-COAL 50000 305946 36700
CHHABRA TPS 3 RRVUNL THERMAL-COAL 25000 151536 36700
CHHABRA TPS 4 RRVUNL THERMAL-COAL 25000 155896 36700
RAMGARH GT POWER PROJECT RRVUNL THERMAL-COAL 22050 43177 41800
RAMGARH GAS T P PROJECT 3 RRVUNL THERMAL-GAS 5000 93615 41800
DHOLPUR C C POWER PROJECT RRVUNL THERMAL-R-LNG 33000 9486 46110
MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 14000 20855 34192
MINI MICRO HYDEL (MMH) P S RRVUNL HYDRO-HYDRO 2385 851 37800
KALISINDH TPP 1 RRVUNL THERMAL-COAL 60000 341543 45000
KALISINDH TPP 2 RRVUNL THERMAL-COAL 60000 211588 45000
KHARA HEP UPJVNL HYDRO-HYDRO 7200 26654 7200
MATATILLA HEP UPJVNL HYDRO-HYDRO 3060 12219 6500
OBRA HEP UPJVNL HYDRO-HYDRO 9900 21517 6300
RIHAND UPJVNL HYDRO-HYDRO 30000 57369 5500
ANPARA A TPS UPRVUNL THERMAL-COAL 63000 317536 27000
ANPARA B TPS UPRVUNL THERMAL-COAL 100000 705605 22700
ANPARA D UPRVUNL THERMAL-COAL 100000 300158 39800
HARDUAGANJ TPS UPRVUNL THERMAL-COAL 16500 45817 49200
HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 50000 304389 46600
OBRA A TPS UPRVUNL THERMAL-COAL 28800 13158 34000
OBRA B TPS UPRVUNL THERMAL-COAL 100000 328124 21900
Page 34
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) PANKI TPS UPRVUNL THERMAL-COAL 21000 66488 50300
PARICHHA TPS UPRVUNL THERMAL-COAL 22000 38762 49400
PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 42000 231931 45600
PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 50000 276722 50400
CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 24000 70845 8290
CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 14400 75366 8390
DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 3375 9595 12080
DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 5100 18701 10520
KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4140 17359 12330
KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 12000 33001 9420
KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 3000 11953 8320
TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 9000 33983 12460
MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 30400 124510 16110
RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 19800 17897 10550
MPUR UTTARAKHAND JVNL HYDRO-HYDRO 930 5121 19200
PATHRI UTTARAKHAND JVNL HYDRO-HYDRO 2040 11636 14200
GALOGI UTTARAKHAND JVNL HYDRO-HYDRO 300 648 12500
PRIVATE SECTOR
MGTPP CLP INDIA PVT LTD THERMAL-COAL 132000 268902 41940
SHRINAGAR HEP ALAKNANDA HPCL HYDRO-HYDRO 33000 127414 48800
GAMA INFRAPROP CCPP GAMA INFRAPROP PVT THERMAL-GAS 22500 52686 47000
PPGCL (BARA) JP POWER VENTURES LTD THERMAL-COAL 198000 448200 38500
MALANA HEP MALANA PCL HYDRO-HYDRO 8600 26354 29792
MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 10000 30369 32580
ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 19200 56347 36079
KASHANG HEP H P PCL HYDRO-HYDRO 19500 5034 29200
BASPA-II HEP HBPCL HYDRO-HYDRO 30000 132769 13600
KARCHAM WANGTOO HEP HBPCL HYDRO-HYDRO 100000 434386 36600
RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 108000 582600 43700
RITHALA COMBI CY POWER PLANT TATA POWER DDL THERMAL-GAS 9480 000 11900
RAJPURA TPS NABHA POWER LTD THERMAL-GAS 140000 901484 39000
TALWANDI SABO POWER LTD TALWANDI SABO POWER LTD THERMAL-COAL 198000 636040 49548
ROJA THERMAL POWER STATION ROJA POWER SCL THERMAL-COAL 120000 727200 43400
KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 34400 63400
BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 36000 62600
MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 38200 60800
UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 37900 61500
KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 42300 58800
LALITPUR PGCL BAJAJ ENERGY PVT LTD THERMAL-COAL 198000 359400 47300
PRAYAGRAJ PGCL PRAYAGRAJ PGCL THERMAL-COAL 132000 448200 38595
KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 132000 783182 33438
WESTERN REGION
CENTRAL SECTOR
INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 100000 325333 23892
OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 52000 141663 34001
GANDHAR CCPP NTPC LTD THERMAL-GAS 65739 221924 28700
KAWAS CCPP NTPC LTD THERMAL-GASN 65620 167929 27000
KORBA I amp II NTPC LTD THERMAL-COAL 210000 1499171 20500
KORBA III NTPC LTD THERMAL-COAL 50000 358746 26600
SIPAT STPS I NTPC LTD THERMAL-COAL 198000 1479902 26800
SIPAT STPS II NTPC LTD THERMAL-COAL 100000 766549 26500
VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 126000 693142 25800
VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 100000 608781 23800
VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 100000 673475 27600
VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 100000 655924 32900
VINDHYACHAL STPS V NTPC LTD THERMAL-COAL 50000 328265 31700
MOUDA I NTPC LTD THERMAL-COAL 100000 343130 44500
MOUDA Ii NTPC LTD THERMAL-COAL 66000 40637 39900
RATNAGIRI GAS amp POWER PVT LTD RGPPL THERMAL-GAS 196708 442485 47000
KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 000 24729
TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 32000 201227 10740
Page 35
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 365122 19069
TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 787444 29324
STATE SECTOR
GSEG-HAZIRA15610 MW GUJARAT S ENEGEN LTD THERMAL-GAS 15610 1805 28200
GSEG-HAZIRA35143 MW GUJARAT S ENEGEN LTD THERMAL-GAS 35130 22276 51300
GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 21978 51800
AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 13929 26100
KORBA TPS EAST CSPGCL THERMAL-COAL 44000 198673 33880
DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 365808 27570
KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 316500 30420
HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 532878 19410
CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 515 58300
MTTPS CHAMPA U-I CSPGCL THERMAL-COAL 50000 220376 39000
MTTPS CHAMPA U-II CSPGCL THERMAL-COAL 50000 23709 10000
SHP GANGREL CSPGCL HYDRO-HYDRO 1000 2350 36790
BANGO HEP CSPGCL HYDRO-HYDRO 12000 14662 8900
MHP KORBA WEST CSPGCL HYDRO-HYDRO 170 859 38190
SIKASAR HEP CSPGCL HYDRO-HYDRO 700 418 26870
DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8843 74500
DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 19446 51500
GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 66388 71600
GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127488 41300
KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 96072 43900
KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 29841 56400
SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 184966 58800
UKAI 1-5 GSECL THERMAL-COAL 85000 204891 46900
UKAI TPS 6 GSECL THERMAL-COAL 50000 284448 48200
WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 271999 58300
WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 82808 44100
KADANA HPS GSECL HYDRO-HYDRO 24200 34433 16800
UKAI HPS GSECL HYDRO-HYDRO 30500 40585 6100
TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 123000 11500
BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 8900 10900
BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 7200 27500
JHINNA HPS MPPGCL HYDRO-HYDRO 2000 9700 18500
RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 44300 3400
GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 17300 4600
SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 4100 16900
MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 14600 27000
PENCH HPS MPPGCL HYDRO-HYDRO 16000 23700 8100
RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 3000 16900
AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 134400 35100
SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 283800 38700
SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 344600 34300
SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 111600 61600
SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 211800 58000
SSTPS PH-I MPPGCL THERMAL-COAL 120000 233100 84300
BHUSAWAL TPS MSPGCL THERMAL-COAL 142000 566258 51100
CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1365682 33700
KHAPERKHEDA MSPGCL THERMAL-COAL 134000 706207 39100
KORADI TPS MSPGCL THERMAL-COAL 62000 443206 42000
NASIK TPS MSPGCL THERMAL-COAL 63000 297275 47000
PARLI TPS MSPGCL THERMAL-COAL 113000 175934 71600
PARAS MSPGCL THERMAL-COAL 50000 267931 38700
URAN CCPP MSPGCL THERMAL-GAS 67200 320330 30600
KOYANA MSPGCL HYDRO-HYDRO 195600 328155 13100
SMALL HYDRO POWER PLANTS MSPGCL HYDRO-HYDRO 45400 93062 30500
BHIRA MSPGCL HYDRO-HYDRO 8000 10046 8400
TILLARI MSPGCL HYDRO-HYDRO 8900 10584 3100
SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 233298 20500
SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 87633 20500
PRIVATE SECTOR
Page 36
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 81282 46750
JNSTPP(JAYPEE NIGRIE) JP POWER VENTURES LTD THERMAL-COAL 132000 726695 29310
MB POWER MB POWER THERMAL-COAL 120000 345632 38310
ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 754922 28671
ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 780761 23495
ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 198000 1263784 32090
ADANI POWER MAHARA ADANI POWER LTD THERMAL-COAL 330000 1666191 34124
AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 170065 36827
SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 252035 45129
ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 458551 36000
ESSAR POWER MP LTD ESSAR POWER MP LTD THERMAL-COAL 60000 243040 28600
VEDANTA LTD (P P -I) VEDANTA LTD THERMAL-GAS 3000 15044 24000
VEDANTA LTD (P P -II) VEDANTA LTD THERMAL-GAS 3000 21293 24000
PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 8234600 24000
165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 5850 64390
145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 68717 40349
SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 132655 28776
SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 144686 38567
MUNDRA UMPPCOASTAL GUJARAT POWER
LTD THERMAL-IMP COAL 400000 2530300
23900
LANCO AMARKANTAK TPP PATHADIH
U-ILANCO AMARKAN POWER LTD THERMAL-COAL 30000 195500
29200
LANCO AMARKANTAK TPP PATHADIH
U-IILANCO AMARKAN POWER LTD THERMAL-COAL 30000 206900
27600
BARADARHA TPS D B POWER LTD THERMAL-COAL 120000 677373 29200
JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 405000 28900
JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 453000 40500
DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 339437 40700
TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 293400 44000
TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 137200 37000
TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 174900 44000
BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 92900 14100
BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23700 34300
KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 27600 48300
CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2530300 23900
BHANDARDRA HEP -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 2475 54900
SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 161400 26500
SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 445000 39000
SOTHERN REGION
CENTRAL SECTOR
NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 325699 54820
NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 305532 39880
NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 998805 38510
NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 113016 54070
NEYVELI TAMILNADU POWER LTD JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 625274 42200
VALLUR TPS NTPC TECL THERMAL-COAL 150000 856438 42350
R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 1493 84300
RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1502919 29400
RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 341291 31800
SIMHADRI I NTPC LTD THERMAL-COAL 100000 688382 36800
SIMHADRI II NTPC LTD THERMAL-COAL 100000 663657 43400
KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 593110 31324
MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 291625 21764
KKNPP-1 amp 2 NPCIL NUCLEAR-NUCLEAR 200000 572609 40948
MINICOY LAKSHADEEP THERMAL-DIESEL 340 770 29600
KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1097 29600
AMINI LAKSHADEEP THERMAL-DIESEL 265 509 29600
ANDROTT LAKSHADEEP THERMAL-DIESEL 219 524 29600
KALPENI LAKSHADEEP THERMAL-DIESEL 175 356 29600
AGATTI LAKSHADEEP THERMAL-DIESEL 195 658 29600
KADMAT LAKSHADEEP THERMAL-DIESEL 190 414 29600
KILTAN LAKSHADEEP THERMAL-DIESEL 150 269 29600
CHETLET LAKSHADEEP THERMAL-DIESEL 100 139 29600
BITRA LAKSHADEEP THERMAL-DIESEL 043 024 29600
BANGARAM LAKSHADEEP THERMAL-DIESEL 018 009 29600
Page 37
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) STATE SECTOR
Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 721811 46500
Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 50000 336142 46500
RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 237358 46500
RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 239926 46500
RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 124500 46500
SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 62109 46500
UPPER SILERU APGENCO HYDRO-HYDRO 24000 33000 46500
LOWER SILERU APGENCO HYDRO-HYDRO 46000 81066 46500
DONKARAI APGENCO HYDRO-HYDRO 2500 6007 46500
PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 1262 46500
CHETTIPETA APGENCO HYDRO-HYDRO 100 214 46500
MUCHKUND APGENCO HYDRO-HYDRO 12000 37571 46500
NAGARJUNASAGAR RCPH APGENCO HYDRO-HYDRO 9000 606 46500
TUNGABHADRA HES amp HAMPI(AP
Share)
APGENCO HYDRO-HYDRO 7200 6100 46500
KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 352232 42600
KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 288131 32500
KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 319272 46500
RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 40073 44300
KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 308317 46000
KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 308963 51300
SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 61004 76600
NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 17960 75300
PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 20873 58300
POCHAMPAD-I TSPGENCO HYDRO-HYDRO 2700 5455 29800
POCHAMPAD-II TSPGENCO HYDRO-HYDRO 900 1932 40700
NIZAMSAGAR TSPGENCO HYDRO-HYDRO 1000 1126 53400
RAICHUR TPS 1 to 7 KPCL THERMAL-COAL 147000 890866 43800
RAICHUR TPS 8 KPCL THERMAL-COAL 25000 159523 48200
BELLARI TPS 1 KPCL THERMAL-COAL 50000 318679 51100
BELLARI TPS 2 KPCL THERMAL-COAL 50000 232347 55600
BELLARI TPS 3 KPCL THERMAL-COAL 70000 47565 34400
BHADRA PH KPCL HYDRO-HYDRO 3920 2369 45900
GERUSUPPA PH KPCL HYDRO-HYDRO 24000 26990 22000
GHAT PRABHA HEP KPCL HYDRO-HYDRO 3200 4777 25300
KADRA HPS KPCL HYDRO-HYDRO 15000 16889 26800
NAGJHARI KPCL HYDRO-HYDRO 90000 155159 9800
KODASALLI DPH KPCL HYDRO-HYDRO 12000 14854 19200
MUNIRA+MGH+SPH+SPH KPCL HYDRO-HYDRO 22640 48211 7900
SHARAVATHY HPS KPCL HYDRO-HYDRO 108550 276215 5400
ALMATTI DPH KPCL HYDRO-HYDRO 29000 39611 24600
VARAHI UGPH KPCL HYDRO-HYDRO 46000 71368 15600
IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 17196 15300
IDUKKI HPS KSEB HYDRO-HYDRO 78000 137905 15300
KAKKAD HPS KSEB HYDRO-HYDRO 5000 13063 15300
KALLADA HPS KSEB HYDRO-HYDRO 1500 4436 15300
KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 46544 15300
KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 635 15300
LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 30822 15300
MALANKARA HPS KSEB HYDRO-HYDRO 1050 2474 15300
MATTUPETTY KSEB HYDRO-HYDRO 200 230 15300
MALAMPUZHA KSEB HYDRO-HYDRO 250 063 15300
CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 864 15300
URUMI ST I amp II KSEB HYDRO-HYDRO 615 903 15300
LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 248 15300
NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7765 19625 15300
PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 16601 15300
PANNIAR HPS KSEB HYDRO-HYDRO 3240 6217 15300
PORINGALKUTHU KSEB HYDRO-HYDRO 3600 10052 15300
PORINGALKUTHU LBE KSEB HYDRO-HYDRO 1600 9438 15300
PEPPARA KSEB HYDRO-HYDRO 300 395 15300
POOZHITHODE KSEB HYDRO-HYDRO 480 1045 15300
Page 38
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) PEECHI KSEB HYDRO-HYDRO 125 040 15300
RANI-PERUNADU KSEB HYDRO-HYDRO 400 585 15300
SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 79783 15300
SENGULAM HPS KSEB HYDRO-HYDRO 5120 11558 15300
SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 16711 15300
VILANGAD KSEB HYDRO-HYDRO 750 1578 15300
BARAPOLE KSEB HYDRO-HYDRO 1500 1932 15300
VELLATHOOVAL KSEB HYDRO-HYDRO 360 305 15300
CHIM0NY KSEB HYDRO-HYDRO 250 156 15300
ADYANPARA KSEB HYDRO-HYDRO 350 501 15300
BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 554 15300
KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 3801 15300
KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 23132 32800
ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 14416 62280
METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 523970 62280
METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 321270 62280
NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 336575 62280
NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 591240 62280
TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 508966 62280
KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 30897 62280
VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 18720 90699 62280
KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 33593 62280
BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 1047 62280
PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 1250 62280
PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 330 62280
MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 4897 62280
MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 032 62280
KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15681 62280
KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 40608 62280
KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 21342 62280
KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 4717 62280
KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4322 62280
KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2399 62280
METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 4416 62280
METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 8035 62280
BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2187 62280
BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2359 62280
BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2511 62280
BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 1949 62280
BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 1819 62280
POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 172 62280
SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 241 62280
MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 026 62280
THIRUMOORTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 136 62280
PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 9309 62280
VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 353 62280
SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 4192 62280
PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 6571 62280
SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 1186 62280
SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6319 62280
ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 6122 62280
KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 28674 62280
SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 18381 62280
SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 4258 62280
KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 12680 62280
KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4201 62280
ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 000 62280
PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 19175 62280
AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 078 62280
BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 504 62280
BHAVANI KATTALAI (BKB)(IIIampIII BB I amp II)TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 5847 62280
PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 000 62280
Page 39
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) SRI DAMODARAM STPS APPDCL THERMAL-COAL 160000 808108 36300
PRIVATE SECTOR
KARUPPUR TANJORE LANCO TANJORE PCL THERMAL-GAS 12000 48096 28770
SIMHAPURI ENERGY LTD SIMHAPURI ENERGY LTD THERMAL-COAL 60000 143900 39100
JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 7111 45500
SBU 1 JSW ENERGY LTD
VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 26000 159100
43300
SBU 2 JSW ENERGY LTD
VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 60000 247900
42800
LANCO KPLLANCO KONDAPALLI POWER
LTDTHERMAL-GAS 36814 85060
25776
LANCO KPL STG -IILANCO KONDAPALLI POWER
LTDTHERMAL-GAS 36600 12979
46330
LANCO KPL STG -IIIALANCO KONDAPALLI POWER
LTDTHERMAL-GAS 37100 85710
46330
LANCO KPL STG -III BLANCO KONDAPALLI POWER
LTDTHERMAL-GAS 37100 43639
46330
HINDUJA NATIONAL PCL HINDUJA NATIONAL PCL THERMAL-COAL 104000 303000 38200
MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 121164 49940
UDUPI POWER COR LTD ADANI POWER LTD THERMAL-COAL 120000 754613 42500
SPECTRUM POWER GENERATION
LTD SPECTRUM PG LTD THERMAL-GASN 20525 9256812
34952
TAQA NEYVELI POWER COM PVT
LTD TAQA NEYVELI THERMAL-LIG 25000 5840
34500
ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 251000 51000
ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 207860 36800
GMR VEMAGIRI POWER GENERATION
LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 30117
46450
EASTERN REGION
CENTRAL SECTOR
MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 64675 53113
MTPS STAGE - II KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 39000 1432 69138
BOKARO `B` TPS DVC THERMAL-COAL 63000 145670 31539
MEJIA TPS U 1-3 DVC THERMAL-COAL 63000 348298 31552
MEJIA TPS U 4 DVC THERMAL-COAL 21000 116099 34997
MEJIA TPS U 5-6 DVC THERMAL-COAL 50000 276427 35976
MEJIA TPS U 7-8 DVC THERMAL-COAL 100000 552854 36991
DURGAPUR STEEL TPS DVC THERMAL-COAL 100000 665550 39323
DURGAPUR TPS DVC THERMAL-COAL 21000 59270 35416
RAGHUNATHPUR TPS DVC THERMAL-COAL 120000 201650 35326
MAITHON HYDEL STA DVC HYDRO-HYDRO 6320 12200 17984
CHANDRAPURA TPSU1-3 DVC THERMAL-COAL 42000 257610 35095
CHANDRAPURA TPSU7-8 DVC THERMAL-COAL 50000 306673 34987
KODERMA TPS DVC THERMAL-COAL 100000 380180 38131
PANCHET HPS DVC HYDRO-HYDRO 8000 13360 17984
TILLAYA HPS DVC HYDRO-HYDRO 400 1410 17984
RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34700 35400
TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 277300 23200
TLDP -III NHPC LTD HYDRO-HYDRO 13200 55400 62000
TLDP -IV NHPC LTD HYDRO-HYDRO 16000 60300 25600
FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 957219 33700
FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 308943 41000
BONGAINGAON TPS NTPC LTD THERMAL-COAL 25000 153663 58600
KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 542277 34200
KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 942591 34200
BARH-II NTPC LTD THERMAL-COAL 132000 728021 44500
TALCHER TPS NTPC LTD THERMAL-COAL 46000 335521 30100
TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 702319 25600
TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1436521 24700
STATE SECTOR
BTPS(RampM) BIHAR STATE PGCL THERMAL-COAL 22000 12142 39700
BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 98331 10602
HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 50593 9482
CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 19689 2605
RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 53192 6033
UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 147208 14637
Page 40
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 60353 4519
IB TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 288567 25000
J P H GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 210 038 61100
MEYONG CHU GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 400 1086 61100
TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 122667 38200
DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 214339 43321
KOLAGHAT THERMAL POWER
STATION
WEST BENGAL PDCL THERMAL-COAL 126000 538269 31603
BAKRESHWAR THERMAL POWER
PLANT
WEST BENGAL PDCL THERMAL-COAL 105000 634876 32154
BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 45000 166855 33299
SANTHALDIH THERMAL POWER
STATION
WEST BENGAL PDCL THERMAL-COAL 50000 336442 34932
SAGARDIGHI THERMAL POWER
PROJECT
WEST BENGAL PDCL THERMAL-COAL 160000 423121 34705
JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 20344 68900
RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 24559 68900
TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 4623 68900
PURULIA PUMPED STORAGE
PROJECT
WEST BENGAL SEDCL HYDRO-HYDRO 90000 108816 68900
MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2768 68900
PRIVATE SECTOR
CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 49474 20230
CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 555500 70200
HALDIA ENERGY HALDIA ENERGY LTD THERMAL-COAL 60000 371000 50400
DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3688 63400
KAMALANGA TPS GMR KAMALANGA ENERGY LTD THERMAL-COAL 105000547670
33300
ADHUNIK POWER U-1 ADHUNIK POWER THERMAL-COAL 27000 158 44060
ADHUNIK POWER U-2 ADHUNIK POWER THERMAL-COAL 27000 168 44250
VL-JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 332800 23622
JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 43000 45250
JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 71700 37030
JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 70700 35920
JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 71100 38870
JOJOBERA UNIT 5 TATA POWER COM LTD THERMAL-COAL 12000 79300 44560
JOJOBERA UNIT 6 TATA POWER COM LTD THERMAL-WHR 12000 83700 12840
IEL KALINGANAGAR U-I TATA POWER COM LTD THERMAL-WG 6750 33400 22500
IEL KALINGANAGAR U-II TATA POWER COM LTD THERMAL-WG 6750 34800 22500
MAITHON UNIT 1 amp 2 TATA POWER COM LTD THERMAL-COAL 105000 678000 36100
HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 27500 24340
HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 28400 24340
HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 15800 24310
NORTH EASTERN REGION
CENTRAL SECTOR
LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 74100 36600
AGARTALA GT NEEPCO THERMAL-GAS 13500 88611 27210
ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 153111 32310
DOYANG HEP NEEPCO HYDRO-HYDRO 7500 25598 49801
KOPILI HEP NEEPCO HYDRO-HYDRO 20000 98186 11491
KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 19582 20237
KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 10310 17968
RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 124093 22945
TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 10100 17344 39000
STATE SECTOR
HYDRO POWER (122 Stns) ITANAGAR GOVT OF ARUNACHAL
PRADESHHYDRO-HYDRO 6971 6217270
24600
KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39514 17337
LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 82327 36810
NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 33318 48290
MYNTRIANG SHEP ST II ASSAM POWER GENCO HYDRO-HYDRO 300 567 35776
LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 9130 49200
LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 012 49200
DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 022 49200
TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 000 49200
UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 4990 16000
UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 6476 37000
UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 16494 14600
UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 3600 9556 15000
SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 758 8000
MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44070 44800
KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 154 41400
TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 091 41400
MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 411 41400
MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 394 41400
KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 760 41400
SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 3264 41400
LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 044 41400
BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 18953 28000
ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 43585 28200
GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 4080 11100
Note
LIG Lignite N Naptha WHR Waste Heat Recovery
Page 41
File NoCEA-CH-14-1142018-Coordination Division
(As on 31102018)
Coal Gas Diesel Total
State 000 000 000 000 000 000 005 005
Private 000 4800 000 4800 000 000 091 4891
Central 45478 1967 000 47445 2600 000 000 50045
Sub-Total 45478 6767 000 52245 2600 000 096 54941
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 1301 1301
Central 12663 4334 000 16997 700 000 000 17697
Sub-Total 12663 4334 000 16997 700 000 1301 18998
State 475000 217782 000 692782 000 77200 800 770782
Private 776567 396000 000 1172567 000 000 729782 1902349
Central 309051 42400 000 351451 55900 000 23830 431181
Sub-Total 1560618 656182 000 2216800 55900 77200 754412 3104312
State 408000 000 000 408000 000 170366 8396 586762
Private 617400 10000 000 627400 000 000 378205 1005605
Central 279441 25700 000 305141 27300 152000 30000 514441
Sub-Total 1304841 35700 000 1340541 27300 322366 416601 2106808
State 228000 000 000 228000 000 12000 1105 241105
Private 849000 000 000 849000 000 000 52430 901430
Central 195344 000 000 195344 4800 10000 000 210144
Sub-Total 1272344 000 000 1272344 4800 22000 53535 1352679
State 1017000 67200 000 1084200 000 285084 20813 1390097
Private 1245600 56800 000 1302400 000 48100 842815 2193315
Central 433475 227273 000 660748 69000 000 12300 742048
Sub-Total 2696075 351273 000 3047348 69000 333184 875927 4325459
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 546 546
Central 17444 6634 000 24078 900 000 000 24978
Sub-Total 17444 6634 000 24078 900 000 546 25524
211400 19759 000 231159 22800 000 000 253959
State 2128000 284982 000 2412982 000 544650 31119 2988751
Private 3488567 467600 000 3956167 000 48100 2005170 6009437
Central 1504295 328067 000 1832362 184000 162000 66130 2244492
Grand Total 7120862 1080649 000 8201511 184000 754750 2102418 11242679
Central - Unallocated
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
WESTERN REGION
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
State Ownership Sector
Modewise breakup
Grand TotalThermalNuclear
Hydro
(Renewable)
RES
(MNRE)
Total (Western
Region)
Goa
Daman amp Diu
Gujarat
Madhya Pradesh
Chhattisgarh
Maharashtra
Dadra amp Nagar
Naveli
File NoCEA-CH-14-1142018-Coordination Division
(As on 31102018)
Coal Gas Diesel Total
State 501000 23540 000 524540 000 167360 4875 696775
Private 387388 381318 3680 772386 000 000 693073 1465459
Central 167456 000 000 167456 12727 000 25000 205183
Sub-Total 1055844 404858 3680 1464382 12727 167360 722948 2367417
State 508250 000 000 508250 000 247993 4022 760265
Private 83945 83182 000 167127 000 000 375048 542175
Central 195612 000 000 195612 14873 000 1000 211485
Sub-Total 787807 83182 000 870989 14873 247993 380070 1513925
State 502000 000 12792 514792 000 359980 15533 890305
Private 195850 000 2520 198370 000 000 1275640 1474010
Central 282920 000 000 282920 69800 000 000 352720
Sub-Total 980770 000 15312 996082 69800 359980 1291173 2717035
State 000 000 15996 15996 000 188150 15402 219548
Private 61500 17400 000 78900 000 000 20899 99799
Central 114322 35958 000 150280 36200 000 5000 191480
Sub-Total 175822 53358 15996 245176 36200 188150 41301 510827
State 432000 52408 000 484408 000 220320 12270 716998
Private 483767 50310 41170 575247 000 000 1130984 1706231
Central 448952 000 000 448952 144800 000 18190 611942
Sub-Total 1364719 102718 41170 1508607 144800 220320 1161444 3035171
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 000 000
Central 10000 000 000 10000 000 000 000 10000
Sub-Total 10000 000 000 10000 000 000 000 10000
State 000 3250 000 3250 000 000 000 3250
Private 000 000 000 000 000 000 171 171
Central 24840 000 000 24840 8600 000 000 33440
Sub-Total 24840 3250 000 28090 8600 000 171 36861
178400 000 000 178400 45000 000 000 223400
State 1943250 79198 28788 2051236 000 1183803 52102 3287141
Private 1212450 532210 47370 1792030 000 000 3495815 5287845
Central 1422502 35958 000 1458460 332000 000 49190 1839650
Grand Total 4578202 647366 76158 5301726 332000 1183803 3597107 10414636
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
SOUTHERN REGION
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
State Ownership Sector
Modewise breakup
Grand TotalThermal RES
(MNRE)Nuclear
Hydro
(Renewable)
Kerala
Tamil Nadu
NLC
Puducherry
Central - Unallocated
Total (Southern
Region)
Andhra Pradesh
Telangana
Karnataka
File NoCEA-CH-14-1142018-Coordination Division
(As on 31102018)
Coal Gas Diesel Total
State 71000 000 000 71000 000 000 7070 78070
Private 28100 000 000 28100 000 000 25545 53645
Central 291433 000 000 291433 000 11000 000 302432
Sub-Total 390533 000 000 390533 000 11000 32615 434147
State 42000 000 000 42000 000 13000 405 55405
Private 73000 000 000 73000 000 000 3207 76207
Central 39374 000 000 39374 000 6100 000 45474
Sub-Total 154374 000 000 154374 000 19100 3612 177086
State 540000 10000 000 550000 000 98600 9195 657795
Private 242500 000 000 242500 000 000 34452 276952
Central 76077 000 000 76077 000 41000 000 117077
Sub-Total 858577 10000 000 868577 000 139600 43647 1051824
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 000 000
Central 698504 000 000 698504 000 18620 000 717124
Sub-Total 698504 000 000 698504 000 18620 000 717124
State 42000 000 000 42000 000 206192 630 248822
Private 293900 000 000 293900 000 000 21648 315548
Central 163390 000 000 163390 000 8900 1000 173290
Sub-Total 499290 000 000 499290 000 215092 23278 737660
State 000 000 000 000 000 36000 5211 41211
Private 000 000 000 000 000 39900 001 39901
Central 8703 000 000 8703 000 6400 000 15103
Sub-Total 8703 000 000 8703 000 82300 5212 96215
110183 000 000 110183 000 8501 000 118684
State 695000 10000 000 705000 000 353792 22511 1081303
Private 637500 000 000 637500 000 39900 84853 762253
Central 1387664 000 000 1387664 000 100520 1000 1489184
Grand Total 2720164 10000 000 2730164 000 494212 108364 3332740
(As on 31102018)
Coal Gas Diesel Total
State 000 32821 000 32821 000 10000 3001 45822
Private 000 2450 000 2450 000 000 1680 4130
Central 27902 43556 000 71458 000 36851 000 108309
Sub-Total 27902 78827 000 106729 000 46851 4681 158261
State 000 000 000 000 000 000 10710 10710
Private 000 000 000 000 000 000 539 539
Central 2470 4682 000 7152 000 11800 000 18952
Sub-Total 2470 4682 000 7152 000 11800 11249 30201
State 000 000 000 000 000 32200 3103 35303
Private 000 000 000 000 000 000 006 006
Central 3040 10969 000 14009 000 7446 000 21455
Sub-Total 3040 10969 000 14009 000 39646 3109 56764
State 000 16950 000 16950 000 000 1601 18551
Private 000 000 000 000 000 000 009 009
Central 3740 43695 000 47435 000 7077 500 55012
Sub-Total 3740 60645 000 64385 000 7077 2110 73572
State 000 000 3600 3600 000 000 545 4145
Private 000 000 000 000 000 000 217 217
Central 3140 7157 000 10297 000 9677 000 19974
Sub-Total 3140 7157 3600 13897 000 9677 762 24336
State 000 000 000 000 000 000 3067 3067
Private 000 000 000 000 000 000 100 100
Central 2140 4893 000 7033 000 5860 000 12893
Sub-Total 2140 4893 000 7033 000 5860 3167 16060
State 000 000 000 000 000 000 3647 3647
Private 000 000 000 000 000 000 020 020
Central 2070 4046 000 6116 000 9913 000 16029
Sub-Total 2070 4046 000 6116 000 9913 3667 19696
7500 6362 000 13862 000 14376 000 28238
State 000 49771 3600 53371 000 42200 25674 121245
Private 000 2450 000 2450 000 000 2571 5021
Central 52002 125360 000 177362 000 103000 500 280862
Grand Total 52002 177581 3600 233183 000 145200 28745 407128
Central - Unallocated
Total (Eastern
Region)
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
NORTH-EASTERN REGION
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
State Ownership Sector
Modewise breakup
Grand TotalThermalNuclear
Bihar
Jharkhand
West Bengal
DVC
Odisha
Sikkim
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
EASTERN REGION
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
Ownership Sector
Modewise breakup
Grand TotalThermalNuclear
Hydro
(Renewable)
RES
(MNRE)
Manipur
Nagaland
State
Mizoram
Central - Unallocated
Total (North-
Eastern Region)
Hydro
(Renewable)
RES
(MNRE)
Assam
Arunachal Pradesh
Meghalaya
Tripura
File NoCEA-CH-14-1142018-Coordination Division
(As on 31102018)
Coal Gas Diesel Total
State 000 000 4005 4005 000 000 525 4530
Private 000 000 000 000 000 000 146 146
Central 000 000 000 000 000 000 510 510
Sub-Total 000 000 4005 4005 000 000 1181 5186
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 075 075
Central 000 000 000 000 000 000 000 000
Sub-Total 000 000 000 000 000 000 075 075
State 000 000 4005 4005 000 000 525 4530
Private 000 000 000 000 000 000 221 221
Central 000 000 000 000 000 000 510 510
Grand Total 000 000 4005 4005 000 000 1256 5261
19
Andaman amp
Nicobar
lakshadweep
Total (Islands)
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
State Ownership Sector
Modewise breakup
Grand TotalThermalNuclear
Hydro
(Renewable)
RES
(MNRE)
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
ISLANDS
File NoCEA-CH-14-1142018-Coordination Division
SrNo Contents Page
1 Executive summary of Target and Achievement of Transmission Lines during 2018-19
20(1)
2 List of Transmission Lines CommissionedReady for commissioning during Oct-2018 20(2)
Section C - Transmission Lines
File NoCEA-CH-14-1142018-Coordination Division
Executive summary of Target and Achievement of Transmission Lines during 2018-19 As on Oct-18
(All figures in circuit kms)
Centr
al S
ecto
r
Sta
te S
ecto
r
JV
Private
Secto
r
To
tal
Centr
al S
ecto
r
Sta
te S
ecto
r
JV
Private
Secto
r
To
tal
Centr
al S
ecto
r
Sta
te S
ecto
r
JV
Private
Secto
r
To
tal
Centr
al S
ecto
r
Sta
te S
ecto
r
JV
Private
Secto
r
To
tal
Centr
al S
ecto
r
Sta
te S
ecto
r
JV
Private
Secto
r
To
tal
Cen
tral S
ecto
r
Sta
te S
ecto
r
JV
Pri
vate
Secto
r
Gra
nd
To
tal
0 0 0 0 0 0 0 0 4692 766 827 6285 3045 5906 980 9931 553 5878 0 6431 8290 12550 1807 22647
Oct18 Programme 0 0 0 0 0 0 0 0 300 0 0 300 662 90 562 1314 0 723 0 723 962 813 562 2337
Achievement 0 0 0 0 0 0 0 0 729 0 0 729 471 266 0 737 0 401 0 401 1200 667 0 1867
Upto Oct-18 Programme 0 0 0 0 0 0 0 0 3004 416 0 3420 1350 3109 562 5021 481 4346 0 4827 4835 7871 562 13268
Achievement 0 0 0 0 0 0 0 0 2286 0 178 2464 1436 1783 1595 4814 60 4461 0 4521 3782 6244 1773 11799
20(1)
220 kV Grand Total 800 kV 500 kV
Programme 2018-19
Programme
Achievement
HVDC765 kV 400 kV
File NoCEA-CH-14-1142018-Coordination Division
SlNo Line
Length
(cKM)
1 2 3 4 5 6
1 765 Jharsuguda - Dharamjaygarh line DC PGCIL 296
2 765LILO of Kurnool - Thirvualam line at
CuddapahDC PGCIL 190
3 765 Salem PS - Madhugiri PS line SC PGCIL 243
4 400 Cuddapah - Hindupur line (Q) DC PGCIL 338
5 400LILO of Both Ckt of Bamnauli - Samaypur at
TughlakabadMC PGCIL 114
6 400LILO-Out of Cuddapah - Hindupur line (Q)
(Both Ckts) at NP Kunta ssDC PGCIL 19
1200
7 400LILO of Sterlite - Meramundali at Lapanga
4oo kV ssDC OPTCL 14
8 400 Sterlite - Lapanga line DC OPTCL 37
9 400 TMDC Podili - Sattapenalli line DC APTRANSCO 215
10 230Neyveli 230110 kV ss - Eachangadu
230kV FeederSC TANTRANSCO 1
11 230 NNTPS - Neyveli 230110kV ss DC TANTRANSCO 2
12 220 Ajmer (400 kV) - Bherunda (TK) DC RVPNL 100
13 220 Aligarh - Atrauli line DC UPPTCL 77
14 220 Khandwa - Chhanera line DC MPPTCL 78
15 220LILO of one Ckt of Hadala - Sartanpar line
at Wankaner on MC towersDC GETCO 6
16 220 LILO of one Ckt of Vita - Miraj at Alkud ss DC MSETCL 27
17 220 Mendhigiri - Alkud ss DC MSETCL 110
667
1867
20(2)
Grand Total
2Transmission Lines (220 kV and above) CommissionedReady for commissioning During Oct-2018
As on 31-10-18
Voltage
Level (kV)Name of Transmission Lines
Circuit
Type
Executing
Agency
CENTRAL SECTOR
Total of CENTRAL SECTOR
STATE SECTOR Sector
Total of STATE SECTOR
File NoCEA-CH-14-1142018-Coordination Division
SN Contents Page
1 Executive summary of Target and Achievement of Substations during 2018-19 21(1)
2Sub Stations (220 kV and above) commissionedready for commisssioning during Oct-
201821(2)
Section D - Sub Stations
File NoCEA-CH-14-1142018-Coordination Division
1 Executive summary of Target and Achievement of Substations during 2018-19 As on Oct-18
(All figures in circuit MVA)
Centr
al S
ecto
r
Sta
te S
ecto
r
JV
Private
Secto
r
To
tal
Centr
al S
ecto
r
Sta
te S
ecto
r
JV
Private
Secto
r
To
tal
Centr
al S
ecto
r
Sta
te S
ecto
r
JV
Private
Secto
r
To
tal
Centr
al S
ecto
r
Sta
te S
ecto
r
JV
Private
Secto
r
To
tal
Centr
al S
ecto
r
Sta
te S
ecto
r
JV
Private
Secto
r
To
tal
Cen
tral S
ecto
r
Sta
te S
ecto
r
JV
Pri
vate
Secto
r
Gra
nd
To
tal
3000 0 0 3000 0 0 0 0 22200 0 0 22200 8185 13085 630 21900 740 14760 0 15500 34125 27845 630 62600
Oct18 Programme 0 0 0 0 0 0 0 0 0 0 0 0 1000 1260 630 2890 0 1400 0 1400 1000 2660 630 4290
Achievement 0 0 0 0 0 0 0 0 3000 0 0 3000 1500 3120 0 4620 0 2220 0 2220 4500 5340 0 9840
Upto Oct-18 Programme 0 0 0 0 0 0 0 0 10000 0 0 10000 6130 7435 630 14195 0 9670 0 9670 16130 17105 630 33865
Achievement 0 0 0 0 0 0 0 0 14000 0 0 14000 9000 7550 630 17180 0 10610 0 10610 23000 18160 630 41790
21(1)
220 kV Grand Total 800 kV 500 kV
Programme 2018-19
Programme
Achievement
HVDC765 kV 400 kV
File NoCEA-CH-14-1142018-Coordination Division
As on 31-10-18
Sl Voltage Ratio Capacity
No (kVkV) (MWMVA)
1 2 3 4 5
1 Cuddapah Ss 765400 PGCIL 3000
2 Tughlakabad SS (GIS) 400220 PGCIL 1500
Total of CENTRAL SECTOR 4500
3 Panki Kanpur (Aug) TF-I 400200 UPPTCL 75
4 Hindupur ss (1st ICT) 400220 APTRANSCO 315
5 Thappagundu ss 400110 TANTRANSCO 600
6 Mendhasal (2nd power TF) 400220 OPTCL 20
7 Jodhpur ss (New) 400220 RVPNL 315
8 Shankarpally 400220 TSTRANSCO 500
9 Podili ss (1st ICT) 400220 APTRANSCO 315
10 Doni (Gadag)SS 400220 KPTCL 1000
11 Porur (Addl TF) 230110 TANTRANSCO 100
12 Anuppankulam (Addl TF) 230110 TANTRANSCO 60
13 Neyveli SS 230110 TANTRANSCO 480
14 Savarkundla (Aug) 22066 GETCO 60
15 Bhuna (Aug) 220132 HVPNL 100
16 Madanpur (Aug) 22066 HVPNL 100
17 Gurgaon Sec-52A (Aug) 22066 HVPNL 160
18 IA Hisar (Aug) 220132 HVPNL 50
19 Narwana (Aug) 220132 HVPNL 60
20 Therubali (3rd Auto TF) 220132 OPTCL 160
21 Halasar ss 220132 RVPNL 160
22 Bansi Siddaharthnagar (Aug) TF-I 220132 UPPTCL 60
23 Hata Kushinagar (New) TF-I 220132 UPPTCL 100
24 Gomti nagar Lucknow (Aug) TF-IV 22033 UPPTCL 60
25 Kanpur Road Lucknow (New) TF-III 22033 UPPTCL 60
26 Asoj (Aug) 22066 GETCO 150
27 Kangasiyali (Aug) 22066 GETCO 60
28 Karmsad (Aug) 22066 GETCO 160
29 Lalpar (Aug) 22066 GETCO 60
TOTAL STATE SECTOR 5340
GRAND TOTAL 9840
21(2)
PRIVATE SECTOR
CENTRAL SECTOR
STATE SECTOR
2Sub-Stations (220 kV and above) CommissionedReady for commissioning During Oct-2018
Name of Sub StationsExecuting
Agency
File NoCEA-CH-14-1142018-Coordination Division
SN Contents Page
1 Electricity Generation (MU) Targets and Achievements for 2018-19 22
Section E - Electricity Generation
File NoCEA-CH-14-1142018-Coordination Division
Programme Achievement Ach Programme Achievement Ach
Central Sector 35160700 3028100 3162321 10443 20144400 21150469 10499
State Sector 35132000 3010000 3017260 10024 19922100 19549030 9813
PvtIPP Sector 36999700 3240600 3375603 10417 21598300 20794155 9628
PvtUTL Sector 1857600 164500 180597 10979 1130900 1203107 10638
Total 109150000 9443200 9735781 10310 62795700 62696761 9984
Central Sector 5617600 420900 451004 10715 4193000 4045436 9648
State Sector 6110600 559500 708469 12663 4049400 4433000 10947
PvtIPP Sector 1141800 80500 90122 11195 976400 1021963 10467
PvtUTL Sector 130000 11300 12564 11119 76700 99943 13030
Total 13000000 1072200 1262159 11772 9295500 9600342 10328
Central Sector 3850000 353300 303310 8585 2068900 2203540 10651
Total 3850000 353300 303310 8585 2068900 2203540 10651
Bhutan Import 500000 63300 35395 5592 347000 416660 12007
Central Sector 44628300 3802300 3916635 10301 26406300 27399445 10376
State Sector 41242600 3569500 3725729 10438 23971500 23982030 10004
Pvt Sector 40129100 3496900 3658886 10463 23782300 23119168 9721
Total 126500000 10932000 11336645 10370 74507100 74917303 10055
Provisional based on actual-cum-Assesment
Figs in MU
Cummulative
Achievement
Cummulative
Achievement
Sep-18 Sep-17 Upto Sep-2018 Upto Sep-2017
1073794 748889 7332680 5660929
22
Renewable Energy Generation
Achievement
Oct-2018
1 Electricity Generation (MU) Targets and Achievememts for 2018-19
All India Energy Generation During April 2018- Oct 2018 (MU)
Target (2018-19)April 2018- Oct 2018
Sector
Hydro
Thermal
Nuclear
627957
92955
20689
745071
626968
96003
22035
749173
0
100000
200000
300000
400000
500000
600000
700000
800000
Thermal Hydro Nuclear Total
Programme
Achievement
File NoCEA-CH-14-1142018-Coordination Division
SN Contents Page
1 Energy Power Supply Position (Provisional) for Oct-2018 and during April 2018- Oct 2018 23
2 Peak Power Supply Position (Provisional) for Oct-2018 and during April 2018- Oct 2018 24
3 Energy Power Supply Position (Revised) for Sep-2018 and during April 2018- Sept 2018 25
4 Peak Power Supply Position (Revised) for Sep-2018 and during April 2018- Sept 2018 26
5 Notified Power cuts Restrictions on Industries during Oct-2018 27
6 Power Supply to Agricultural Sector during Oct-2018 28
Section F - Power supply position
File NoCEA-CH-14-1142018-Coordination Division
आकड़ मममलयन यननट नट Figures in MU net
ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied
कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )
चडीगढ़ Chandigarh 108 108 0 00 1055 1055 0 00
दिलली Delhi 2490 2489 1 00 22524 22510 14 01
हरियजणज Haryana 4554 4554 0 00 35205 35205 0 00
दहमजचल परिश Himachal Pradesh 788 787 2 02 5728 5560 168 29
रमम कशमीि Jammu amp Kashmir 1497 1219 278 186 10982 8865 2117 193
परजब Punjab 4418 4418 0 00 38832 38819 13 00
िजरसथजन Rajasthan 6748 6748 0 00 45341 45181 160 04
उतति परिश Uttar Pradesh 10136 9973 164 16 75485 74808 676 09
उततिजखड Uttarakhand 1083 1081 3 03 8395 8310 85 10
उततरी कषतर Northern Region 31822 31375 447 14 243547 240314 3233 13
छततीसगढ़ Chhattisgarh 2454 2453 1 00 16119 16091 28 02
गरिजत Gujarat 11636 11636 0 00 70782 70768 14 00
मधय परिश Madhya Pradesh 5860 5859 1 00 38412 38410 2 00
महजिजषटर Maharashtra 15223 15095 128 08 95489 95355 134 01
िमन औि दिउ Daman amp Diu 216 216 0 00 1523 1523 0 00
िजिि व नगि हवली Dadra amp Nagar Haveli 553 553 0 00 3757 3757 0 00
गोवज Goa 366 366 0 00 2497 2495 2 01
पशचिमी कषतर Western Region 36308 36178 130 04 228579 228398 180 01
आनधर परिश Andhra Pradesh 5860 5854 6 01 37377 37334 43 01
तलगजनज Telangana 6748 6742 6 01 38251 38205 46 01
कनजाटक Karnataka 5842 5835 7 01 39111 39059 52 01
किल Kerala 2116 2096 20 09 14256 14160 96 07
तममल नजड Tamil Nadu 8611 8601 10 01 65742 65666 76 01
पडचिी Puducherry 216 215 1 05 1654 1646 8 05
लकष-दवीप Lakshadweep 4 4 0 0 27 27 0 0
दकषकषणी कषतर Southern Region 29392 29342 50 02 196390 196069 321 02
बबहजि Bihar 2742 2738 4 01 19143 18951 192 10
िजमोिि घजटी ननगम DVC 1712 1698 13 08 13096 12828 268 20
झजिखणड Jharkhand 701 697 4 06 5022 4949 73 15
ओडडशज Odisha 3147 3134 13 04 20224 20192 32 02
पशशचम बगजल West Bengal 4204 4200 4 01 33008 32881 127 04
मसशककम Sikkim 40 40 0 00 279 279 0 01
अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 67 202 188 13 67
परवी कषतर Eastern Region 12547 12507 40 03 90772 90080 692 08
अरणजचल परिश Arunachal Pradesh 67 66 1 09 502 496 7 13
असम Assam 833 809 24 29 6153 5903 250 41
मणणपि Manipur 72 71 1 10 485 478 7 14
मघजलय Meghalaya 147 147 0 00 1043 1042 0 00
ममज़ोिम Mizoram 63 62 1 08 365 359 5 14
नजगजलड Nagaland 76 67 8 110 540 481 59 109
बिपिज Tripura 130 129 1 09 1025 1007 19 18
उततर-परवी कषतर North-Eastern Region 1387 1351 35 25 10113 9766 346 34
समपणण भारत All India 111455 110753 702 06 769399 764627 4773 06
23
ऊराण वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Energy Power Supply Position Report (Provisional)
राजयStateअकरबर2018 October2018 अपरल2018 -अकरबर2018 April2018 to October2018
ऊरजा पनत ा म कमी ऊरजा पनत ा म कमीEnergy not Supplied
Excludes energy exported to Bangladesh
Energy not Supplied
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
File NoCEA-CH-14-1142018-Coordination Division
अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met
कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )
चडीगढ़ Chandigarh 217 217 0 00 369 369 0 00
दिलली Delhi 4713 4713 0 00 7016 7016 0 00
हरियजणज Haryana 7948 7948 0 00 10270 10270 0 00
दहमजचल परिश Himachal Pradesh 1520 1520 0 00 1520 1520 0 00
रमम कशमीि Jammu amp Kashmir 2836 2269 567 200 2951 2361 590 200
परजब Punjab 7979 7979 0 00 12638 12638 0 00
िजरसथजन Rajasthan 11450 11450 0 00 11698 11698 0 00
उतति परिश Uttar Pradesh 17434 16745 688 39 20498 20062 436 21
उततिजखड Uttarakhand 1943 1943 0 00 2143 2143 0 00
उततरी कषतर Northern Region 50659 49635 1024 20 63166 61726 1440 23
छततीसगढ़ Chhattisgarh 4414 4268 146 33 4414 4268 146 33
गरिजत Gujarat 18148 18130 19 01 18148 18130 19 01
मधय परिश Madhya Pradesh 11356 11317 39 03 11356 11317 39 03
महजिजषटर Maharashtra 23864 23159 705 30 23864 23254 610 26
िमन औि दिउ Daman amp Diu 342 341 1 02 357 356 1 02
िजिि व नगि हवली Dadra amp Nagar Haveli 784 780 4 05 816 815 1 01
गोवज Goa 536 536 0 00 596 596 0 00
पशचिमी कषतर Western Region 56548 55695 853 15 56548 55695 853 15
आनधर परिश Andhra Pradesh 9435 9435 0 00 9435 9435 0 00
तलगजनज Telangana 10603 10603 0 00 10815 10815 0 00
कनजाटक Karnataka 10741 10741 0 00 10741 10741 0 00
किल Kerala 3727 3644 83 22 4050 3997 53 13
तममल नजड Tamil Nadu 14747 14333 414 28 15029 14981 47 03
पडचिी Puducherry 363 362 1 03 420 400 19 46
लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0
दकषकषणी कषतर Southern Region 45279 45226 53 01 45946 45684 262 06
बबहजि Bihar 4945 4945 0 00 5050 5045 5 01
िजमोिि घजटी ननगम DVC 2729 2729 0 00 2874 2874 0 00
झजिखणड Jharkhand 1260 1260 0 00 1339 1284 55 41
ओडडशज Odisha 5624 5224 400 71 5624 5357 268 48
पशशचम बगजल West Bengal 8775 8775 0 00 9130 9123 7 01
मसशककम Sikkim 86 86 0 00 90 90 0 00
अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7
परवी कषतर Eastern Region 22959 22567 392 17 22959 22567 392 17
अरणजचल परिश Arunachal Pradesh 138 125 13 94 138 133 5 37
असम Assam 1785 1704 81 45 1865 1809 56 30
मणणपि Manipur 187 185 2 11 193 186 7 36
मघजलय Meghalaya 336 336 0 00 371 368 2 07
ममज़ोिम Mizoram 99 97 2 20 103 98 4 41
नजगजलड Nagaland 134 131 3 22 156 138 18 117
बिपिज Tripura 269 269 0 00 298 293 5 17
उततर-परवी कषतर North-Eastern Region 2790 2700 90 32 2967 2850 117 39
समपणण भारत All India 172945 170604 2341 14 177022 175528 1494 08
24
अधिकतम वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Peak Power Supply Position Report (Provisional)
आकड़ मगज वजट नट Figures in MW netअपरल2018 -अकरबर2018 April2018 to October2018
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
मजग की पनता म कमी Demand not Met
Excludes the supply to Bangladesh
राजयStateअकरबर2018 October2018
मजग की पनता म कमी Demand not Met
File NoCEA-CH-14-1142018-Coordination Division
आकड़ मममलयन यननट नट Figures in MU net
ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied
कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )
चडीगढ़ Chandigarh 141 141 0 00 947 947 0 00
दिलली Delhi 2925 2924 1 00 20034 20021 13 01
हरियजणज Haryana 4794 4794 0 00 30651 30651 0 00
दहमजचल परिश Himachal Pradesh 876 853 24 27 4940 4773 167 34
रमम कशमीि Jammu amp Kashmir 1520 1246 274 180 9485 7646 1839 194
परजब Punjab 5575 5575 0 00 34414 34401 13 00
िजरसथजन Rajasthan 6202 6201 0 00 38594 38434 160 04
उतति परिश Uttar Pradesh 10211 10124 86 08 65349 64836 513 08
उततिजखड Uttarakhand 1162 1149 13 11 7311 7229 82 11
उततरी कषतर Northern Region 33405 33008 398 12 211725 208939 2786 13
छततीसगढ़ Chhattisgarh 2403 2388 15 06 13665 13638 27 02
गरिजत Gujarat 10122 10122 0 00 59146 59132 14 00
मधय परिश Madhya Pradesh 5492 5491 1 00 32552 32551 1 00
महजिजषटर Maharashtra 13615 13612 3 00 80266 80260 6 00
िमन औि दिउ Daman amp Diu 221 221 0 00 1306 1306 0 00
िजिि व नगि हवली Dadra amp Nagar Haveli 551 551 0 00 3204 3204 0 00
गोवज Goa 339 339 0 00 2131 2128 2 01
पशचिमी कषतर Western Region 32742 32723 19 01 192270 192220 50 00
आनधर परिश Andhra Pradesh 5294 5287 7 01 31518 31480 37 01
तलगजनज Telangana 6279 6272 8 01 31503 31463 40 01
कनजाटक Karnataka 5701 5693 8 01 33269 33225 45 01
किल Kerala 2050 2026 24 12 12140 12063 76 06
तममल नजड Tamil Nadu 8971 8959 12 01 57131 57065 66 01
पडचिी Puducherry 226 224 2 08 1438 1431 7 05
लकष-दवीप Lakshadweep 4 4 0 0 23 23 0 0
दकषकषणी कषतर Southern Region 28520 28460 60 02 166998 166727 271 02
बबहजि Bihar 2839 2793 46 16 16400 16213 188 11
िजमोिि घजटी ननगम DVC 1901 1750 151 79 11384 11130 254 22
झजिखणड Jharkhand 740 723 17 22 4321 4252 69 16
ओडडशज Odisha 2921 2918 3 01 17077 17058 19 01
पशशचम बगजल West Bengal 4902 4879 23 05 28804 28681 123 04
मसशककम Sikkim 39 39 0 01 239 239 0 01
अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 67 173 162 12 67
परवी कषतर Eastern Region 13341 13102 240 18 78225 77573 652 08
अरणजचल परिश Arunachal Pradesh 74 73 1 10 435 429 6 14
असम Assam 950 914 36 38 5320 5094 226 43
मणणपि Manipur 70 69 1 11 414 408 6 15
मघजलय Meghalaya 150 150 0 01 896 896 0 01
ममज़ोिम Mizoram 58 57 1 12 302 297 5 16
नजगजलड Nagaland 80 72 8 104 464 414 50 108
बिपिज Tripura 192 191 1 07 895 878 17 19
उततर-परवी कषतर North-Eastern Region 1575 1527 48 31 8726 8415 311 36
समपणण भारत All India 109584 108819 765 07 657944 653873 4071 06
Energy not Supplied Energy not Supplied
ससतबर2018 September2018 अपरल2018 -ससतबर2018 April2018 to September2018
ऊरजा पनत ा म कमी ऊरजा पनत ा म कमी
Excludes energy exported to Bangladesh
राजयState
ऊराण वरवदयत आपरतण शथिरत ररपोरण (सशोधित) Energy Power Supply Position Report (Revised)
25
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
File NoCEA-CH-14-1142018-Coordination Division
अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met
कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )
चडीगढ़ Chandigarh 293 293 0 00 369 369 0 00
दिलली Delhi 5358 5358 0 00 7016 7016 0 00
हरियजणज Haryana 9008 9008 0 00 10270 10270 0 00
दहमजचल परिश Himachal Pradesh 1466 1466 0 00 1479 1479 0 00
रमम कशमीि Jammu amp Kashmir 2951 2361 590 200 2951 2361 590 200
परजब Punjab 11405 11405 0 00 12638 12638 0 00
िजरसथजन Rajasthan 10612 10612 0 00 11698 11698 0 00
उतति परिश Uttar Pradesh 18346 18121 225 12 20498 20062 436 21
उततिजखड Uttarakhand 1996 1996 0 00 2143 2143 0 00
उततरी कषतर Northern Region 56407 55649 758 13 63166 61726 1440 23
छततीसगढ़ Chhattisgarh 4404 4075 328 75 4404 4136 268 61
गरिजत Gujarat 16963 16963 0 00 17053 16963 90 05
मधय परिश Madhya Pradesh 8811 8771 41 05 8811 8775 36 04
महजिजषटर Maharashtra 22455 22349 106 05 23395 23254 141 06
िमन औि दिउ Daman amp Diu 357 356 1 02 357 356 1 02
िजिि व नगि हवली Dadra amp Nagar Haveli 816 815 1 01 816 815 1 01
गोवज Goa 596 596 0 00 596 596 0 00
पशचिमी कषतर Western Region 52933 52895 38 01 53841 52895 945 18
आनधर परिश Andhra Pradesh 9435 9416 19 02 9435 9416 19 02
तलगजनज Telangana 10815 10815 0 00 10815 10815 0 00
कनजाटक Karnataka 10103 10090 13 01 10690 10688 2 00
किल Kerala 3888 3638 251 64 4050 3997 53 13
तममल नजड Tamil Nadu 14556 14553 3 00 15029 14981 47 03
पडचिी Puducherry 390 372 17 45 420 400 19 46
लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0
दकषकषणी कषतर Southern Region 45542 45428 114 02 45946 45684 262 06
बबहजि Bihar 5050 5045 5 01 5050 5045 5 01
िजमोिि घजटी ननगम DVC 2641 2641 0 00 2874 2874 0 00
झजिखणड Jharkhand 1233 1233 0 00 1339 1284 55 41
ओडडशज Odisha 4906 4906 0 00 5357 5357 0 00
पशशचम बगजल West Bengal 8644 8639 5 01 9130 9123 7 01
मसशककम Sikkim 78 78 0 00 90 90 0 00
अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7
परवी कषतर Eastern Region 22110 22100 10 00 22470 22290 180 08
अरणजचल परिश Arunachal Pradesh 132 130 2 15 138 133 5 37
असम Assam 1865 1809 56 30 1865 1809 56 30
मणणपि Manipur 184 182 2 13 193 186 7 36
मघजलय Meghalaya 317 317 0 00 371 368 2 07
ममज़ोिम Mizoram 95 93 2 23 103 98 4 41
नजगजलड Nagaland 142 138 5 32 156 138 18 117
बिपिज Tripura 296 293 3 10 298 293 5 17
उततर-परवी कषतर North-Eastern Region 2921 2850 71 24 2967 2850 117 39
समपणण भारत All India 177022 175528 1494 08 177022 175528 1494 08
26
मजग की पनता म कमी मजग की पनता म कमी Demand not MetDemand not Met
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
Excludes the supply to Bangladesh
अधिकतम वरवदयत आपरतण शथिरत ररपोरण (सशोधित) Peak Power Supply Position Report (Revised)
आकड़ मगज वजट नट Figures in MW net
राजयStateससतबर2018 September2018 अपरल2018 -ससतबर2018 April2018 to September2018
File NoCEA-CH-14-1142018-Coordination Division
अकरबर2018 October2018अपरल2018 -अकरबर2018 April2018 to October2018
उततरी कषतर Northern Region
चडीगढ़ Chandigarh Data not received Data not received
दिलली Delhi
हरियजणज Haryana
दहमजचल परिश Himachal Pradesh
रमम कशमीि Jammu amp Kashmir Data not received Data not received
परजब Punjab
िजरसथजन Rajasthanउतति परिश Uttar Pradesh
उततिजखड Uttarakhand
पशचिमी कषतर Western Region
छततीसगढ़ Chhattisgarh
गरिजत Gujarat
मधय परिश Madhya Pradesh
महजिजषटर Maharashtra
गोवज Goa
दकषकषणी कषतर Southern Region
आनधर परिश Andhra Pradesh
तलगजनज Telangana
कनजाटक Karnataka
किल Kerala
तममल नजड Tamil Nadu
पडचिी Puducherryपरवी कषतर Eastern Region
बबहजि Bihar
झजिखणड Jharkhand
ओडडशज Odisha
पशशचम बगजल West Bengal
N
o No
tified
Cuts
N
o No
tified
Cuts
27
अकरबर 2018 म इडथरीर पर वरवदयत करौती का वरवरवरण Notified Power CutsRestrictions on Industries during October2018
राजय कषतर State Regionऊराणमाग करौती EnergyDemand Cut
No Notified Cuts No Notified Cuts
File NoCEA-CH-14-1142018-Coordination Division
अकरबर2018 October2018अपरल2018 -अकरबर2018 April2018 to October2018
उततरी कषतर Northern Region
चडीगढ़ Chandigarh Data not received Data not received
दिलली Delhi Data not received Data not received
हरियजणज Haryana 940 hrsday 0709 - 0950 hrsday
दहमजचल परिश Himachal Pradesh No cut imposed on agriculture consumers and uninterrupted
power is being supplied to agriculture sector
HPSEBL has only 2 agriculture consumers and uninterrupted
power is being supplied to agriculture sector
रमम कशमीि Jammu amp Kashmir Data not received Data not received
परजब Punjab 0507 hrsday 0349 - 0844 hrsday
िजरसथजन Rajasthan 0630 hrsday 0630 hrsday
उतति परिश Uttar Pradesh 1825 hrsday 1814 - 1858 hrsday
उततिजखड Uttarakhand 2350 hrsday 2128 - 2357 hrsday
पशचिमी कषतर Western Region
छततीसगढ़ Chhattisgarh 18hoursday 18 hrsday
गरिजत Gujarat 805 hrsday 805 hrsday
मधय परिश Madhya Pradesh Three-Phase Supply(Irrigation)-947 hrs day
Three-Phase (Mixed) Supply - 2311 hrs day
Three-Phase Supply(Irrigation)- 0933 - 0947 hrs day Three-
Phase (Mixed) Supply - 2300 - 2320 hrs day
महजिजषटर Maharashtra Three-Phase Supply(Irrigation)- 9 hrs day
Three-Phase (Mixed) Supply - 24 hrs day
Three-Phase Supply(Irrigation)- 9 hrs day
Three-Phase (Mixed) Supply - 24 hrs day
गोवज Goa No restriction No restriction
दकषकषणी कषतर Southern Region
आनधर परिश Andhra Pradesh 07 hrsday 07 hrsday
तलगजनज Telangana 24 hoursday 24 hoursday
कनजाटक Karnataka 6 hrsday 6 hrsday
किल Kerala No Restrictions No Restrictions
तममल नजड Tamil Nadu 9 hrsday (6 hrs during day time and 3 hrs during night time) 9 hrsday (6 hrs during day time and 3 hrs during night time)
पडचिी Puducherry No Restrictions No Restrictions
परवी कषतर Eastern Region
बबहजि Bihar About 18 hrsday About 18 hrsday
झजिखणड Jharkhand About 20 hrsday About 20 hrsday
ओडडशज Odisha 24 hrsday 24 hrsday
पशशचम बगजल West Bengal About 23 hrsday About 23 hrsday
28
अकटबर 2018 कषि कषतर को षिदयत आपरति का षििरण Power Supply to Agricultural Sector during October2018
राजय कषतर State Regionऔसत वरवदयत आपरतण घनरो म Average Hours of Supply
On segregated feeders
File NoCEA-CH-14-1142018-Coordination Division
SNo Contents Page
1 Growth of Installed Capacity since 6th Plan 29
2 Progress of Transmission Sector since 6th Plan 30
3 All India Yearly Coal consumption for Power Generation (Utilities)
4 All India Annual Per Capita Consumption of Electricity since -2006
5 Average cost of power supply amp Average realisation (Paisakwh)
6 Growth of Rural Electrification amp Pump Sets Energisation
7 Status of Hydro Schemes Cleared by the CEA in Oct-2018
Section G - Growth of Power Sector
31
32
File NoCEA-CH-14-1142018-Coordination Division
(In MW)
Coal Gas Diesel Total
End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472
End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634
End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537
End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596
End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921
End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703
End of 12th Plan 19216288 2532938 83763 21832988 6780 4447842 50018 31960630
Up to Oct-2018 19599250 2493722 837629 22176734 6780 4548742 7201281 34604757
Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-17) = 51529 MW
Electricity Generation (MU) Targets and Achievements for 2016-17
Coal Gas Diesel Nuclear Hydro Res Total
1959925 2493722 837629 678000 454874 72012805 22925174
29
1 Growth of Installed Capacity Since 6th Plan
Plan YearThermal
Nuclear Hydro RES (MNRE) Total
Total Installed Capacity 34604757 MW
Coal Gas Diesel Nuclear Hydro Res
File NoCEA-CH-14-1142018-Coordination Division
Progress of Transmission Sector in the Country up to Oct 2018
1 TRANSMISSION LINES (All fig in CKM)
At the end of
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
6th plan 0 0 0 0 0 0 0 0 0 0 0 0 1831 4198 0 6029 1641 44364 0 46005 3472 48562 0 52034
7th plan 0 0 0 0 0 0 0 0 0 0 0 0 13068 6756 0 19824 4560 55071 0 59631 17628 61827 0 79455
8th plan 0 0 0 0 1634 0 0 1634 0 0 0 0 23001 13141 0 36142 6564 73036 0 79600 31199 86177 0 117376
9th plan 0 0 0 0 3234 1504 0 4738 751 409 0 1160 29345 20033 0 49378 8687 88306 0 96993 42017 110252 0 152269
10th plan 0 0 0 0 4368 1504 0 5872 1775 409 0 2184 48708 24730 0 73438 9444 105185 0 114629 64295 131828 0 196123
11th Plan 0 0 0 0 5948 1504 1980 9432 4839 411 0 5250 71023 30191 5605 106819 10140 125010 830 135980 91950 157116 8415 257481
12th Plan 6124 0 0 6124 5948 1504 1980 9432 25465 1177 4598 31240 92482 48240 17065 157787 11014 151276 978 163268 141033 202197 24621 367851
13th Plan (Up
to Mar2018)6124 0 0 6124 5948 1504 1980 9432 28666 1512 4881 35059 98247 54286 19067 171600 11258 156497 1000 168755 150243 213799 26928 390970
13th Plan (Up
to Sep-18)6124 0 0 6124 5948 1504 1980 9432 30952 1512 5059 37523 99683 56069 20662 176414 11318 160958 1000 173276 154025 220043 28701 402769
27150
75050
47900
118050
90650
30
IR addition in 12th Plan (up to
March 2017)
Total IR (up to Oct-18)
IR at the end of 11th Plan
IR at the end of 12th Plan
Envisaged IR Capacity at the end
of 13th Plan
Grand Total
Note - The figure upto the end of 10th plan in for stringing progress including the lines not commissioned Now only commissioned lines are reckoned Accordingly the figure for 10th plan (end) may read as 187555 after adjusting with (-) 10852 Ckm
Inter-regional Power Transfer Capacity
plusmn 800 kV HVDC plusmn 500 kV HVDC 765 kV 400 kV 220 kV
File NoCEA-CH-14-1142018-Coordination Division
2004-05 27800
2005-06 28100
2006-07 30200
2007-08 33000
2008-09 35500
2009-10 36700
2010-11 38700
2011-12 41756
2012-13 45460
2013-14 48940
2014-15 53040
2015-16 54590
2016-17 57430
2017-18 60800
Year
2005-06
2006-07
2007-08
2008-09
2009-10
2010-11
2011-12
2012-13
2013-14
2014-15
2015-16
2016-17
2017-18
2004-05 254 209 7568
2005-06 260 221 7636
2006-07 276 227 7423
2007-08 293 239 7727
2008-09 340 263 8713
2009-10 355 268 8870
2010-11 398 303 11975
2011-12 455 330 13514
2012-13 501 376 14867
2013-14 518 175
2014-15 520
6719
7171
3 All India yearly Coal Consumption for Power Generation (Utilities)
YEARCoal Consumption
Million Tonnes
4 All India Annual per Capita consumption of Electricity Since 2006
Per Capita Consumption ( kWh)
6314
(GrossGen+ Net Import) Mid-year population
5 Average cost of power supply amp average realization ( paiseKWH )
Yearcost of supply
(paiseunit)
Realization(paiseunit)
Including AgricultureOnly
Agriculture
1149
7335
7786
91441
8188
88363
957
1010
1075
1122
File NoCEA-CH-14-1142018-Coordination Division
Source- PFC Reports on the performance of State Power Utilities 31
File NoCEA-CH-14-1142018-Coordination Division
Sl
NoExecuting Agency
Installed
Capacity (MW)Cost (Rs crore)
Date of
Clearance
32
No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification
since 2004-05
65291374575 296361511th Plan
Cumu upto End of 11th Plan
596556 21212860
557439Cummulative up to end of 12th Plan
46708
18423975
499150
2003-042004-05
5743
9769
Cumu upto End of 10th Plan
010407 to 310308
010410 to 310311557976840909
010411 to 310312
412667
86293726
3207
482864
12632
1576036
4451722594
15455554
2314176
397343611750
2093311060316074
65109527813884
6 Growth Of Rural Electrification amp Pumpsets Energisation
Plan Year
9th Plan2002-03
134092626
4111
Pump Sets Energised Villages Electricfied (Nos)
2001-02
284064367244
1218
27801997-981998-991999-002000-01
297594
010408 to 310309010409 to 310310
10th Plan
2005-062006-07
322968331020
Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as
Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received
from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made
available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified
villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is
independent of the earlier published reports
No Hydro Electric Project has been issued concurrenceAppraisal letter by CEA during October 2018
7 Status of Hydro Schemes Cleared by the CEA in Oct-2018
Name of Scheme
File NoCEA-CH-14-1142018-Coordination Division
SN Contents Page
1 Rate of sale of power for the year 2016-17 33-41
RATE OF SALE OF POWER FOR THE YEAR 2016-17
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) NORTHERN REGION
CENTRAL SECTOR
BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 18000 66900 19800
CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 54000 222400 21600
CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 30000 144400 19600
CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 23100 91700 42600
PARBATI - III HPS NHPC LTD HYDRO-HYDRO 52000 68200 54800
DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 28000 95600 30000
CHUTAK NHPC LTD HYDRO-HYDRO 4400 22000 79800
DULHASTI HPS NHPC LTD HYDRO-HYDRO 39000 228000 56400
SALAL HPS NHPC LTD HYDRO-HYDRO 69000 342300 11000
TANAKPUR HPS NHPC LTD HYDRO-HYDRO 9420 43000 29600
URI HPS -I NHPC LTD HYDRO-HYDRO 48000 280300 16000
URI HPS - II NHPC LTD HYDRO-HYDRO 24000 147300 48600
NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 4500 24600 88200
SEWA - II NHPC LTD HYDRO-HYDRO 12000 47100 43400
ANTA CCPP NTPC LTD THERMAL-GASN 41930 67539 32400
AURAIYA CCPP NTPC LTD THERMAL-GASN 66336 53501 39100
BADARPUR TPS NTPC LTD THERMAL-COAL 70500 159153 44800
DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 84000 296170 42300
DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 98000 526686 46300
DADRI CCPP NTPC LTD THERMAL-GASHSD 82978 227469 33000
FARIDABAD CCPP NTPC LTD THERMAL-GASN 43159 115577 30800
RIHAND STPS I NTPC LTD THERMAL-COAL 100000 596766 24500
RIHAND STPS II NTPC LTD THERMAL-COAL 100000 737069 24600
RIHAND STPS III NTPC LTD THERMAL-COAL 100000 706546 30600
SINGRAULI STPS NTPC LTD THERMAL-COAL 200000 1394068 20400
TANDA TPS NTPC LTD THERMAL-COAL 44000 295438 40800
UNCHAHAR TPS I NTPC LTD THERMAL-COAL 42000 256454 39800
UNCHAHAR TPS II NTPC LTD THERMAL-COAL 42000 273577 38900
UNCHAHAR TPS III NTPC LTD THERMAL-COAL 21000 142780 43000
KOLDAM NTPC LTD HYDRO-HYDRO 80000 363260 43600
NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 303575 25841
RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 108000 668677 35374
NJHPS SJVNL HYDRO-HYDRO 150000 699496 23820
RAMPUR HPS SJVNL HYDRO-HYDRO 41202 195982 32260
TEHRI HPP THDC HYDRO-HYDRO 100000 272543 51800
KOTESHWAR HEP THDC HYDRO-HYDRO 40000 106244 53400
IGSTPS JHAJJAR ARAVALI P CPL THERMAL-COAL 150000 510429 49490
NEYVELI BARSINGSAR NEYVELI LIG CORP LTD THERMAL-LIG 25000 127520 38040
STATE SECTOR
PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 21000 14222 48200
PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 21000 19205 48400
PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 25000 102257 42600
PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 25000 62107 41800
DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 60000 312213 41000
RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 120000 35767442200
WYC HYDEL STATION HPGCL HYDRO-HYDRO 6240 20365 24900
GIRI POWER HOUSE HPSEB HYDRO-HYDRO 6000 13958 7600
ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 1695 5467 11900
BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 12000 18528 6700
GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 2250 7462 22500
BASSI POWER HOUSE HPSEB HYDRO-HYDRO 6600 29649 7500
BINWA POWER HOUSE HPSEB HYDRO-HYDRO 600 2749 19300
ANNEXURE-I
RATE OF SALE OF POWER FOR THE YEAR 2016-2017
Page 33
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) GAJ POWER HOUSE HPSEB HYDRO-HYDRO 1050 2914 26700
BANER POWER HOUSE HPSEB HYDRO-HYDRO 1200 2864 16200
HOLI POWER HOUSE HPSEB HYDRO-HYDRO 300 616 22500
THIROT POWER HOUSE HPSEB HYDRO-HYDRO 450 1126 22500
KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 1200 3064 22500
LARJI POWER HOUSE HPSEB HYDRO-HYDRO 12600 53677 23700
NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 250 750 31000
CHABA POWER HOUSE HPSEB HYDRO-HYDRO 175 465 23300
RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 150 101 13400
SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 200 000 22500
KILLAR HPSEB HYDRO-HYDRO 030 050 22500
BHABA AUGUMENP H HPSEB HYDRO-HYDRO 450 1276 22500
BS CHAMBA HPSEB HYDRO-HYDRO 045 099 19500
GUMMA HPSEB HYDRO-HYDRO 300 423 22500
GAS TURBINE POWER STATION IPGCL THERMAL-GAS 27000 67233 39300
PPS-I PPCL THERMAL-GAS 33000 175905 38300
PPS-III PPCL THERMAL-GAS 137120 196879 36100
LOWER JHELUM JampKPDD HYDRO-HYDRO 10500 60214 5100
UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 2260 10514 6300
UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 10500 44202 8500
GANDHARBAL JampKPDD HYDRO-HYDRO 1500 8925 4700
KARNAH MPH JampKPDD HYDRO-HYDRO 200 1122 31000
CHENANI I JampKPDD HYDRO-HYDRO 2330 10892 6600
CHENANI II JampKPDD HYDRO-HYDRO 200 1188 9300
CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 750 3634 14200
IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 375 2108 18500
IGO MERCHELLONG JampKPDD HYDRO-HYDRO 300 1572 29700
PAHALGAM MHP JampKPDD HYDRO-HYDRO 450 1713 32900
MARPACHOO JampKPDD HYDRO-HYDRO 075 375 29800
HAFTAL JampKPDD HYDRO-HYDRO 100 483 28700
SANJAK JampKPDD HYDRO-HYDRO 126 441 36000
SEWA-III JampKPDD HYDRO-HYDRO 900 3273 20200
BHADERWAH JampKPDD HYDRO-HYDRO 150 935 8900
BAZGO JampKPDD HYDRO-HYDRO 030 108 33300
SUMOOR JampKPDD HYDRO-HYDRO 010 045 35400
HUNDER JampKPDD HYDRO-HYDRO 040 176 26200
STAKNA JampKPDD HYDRO-HYDRO 400 1933 4100
KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 124000 662879 31360
SURATGARH TPS RRVUNL THERMAL-COAL 150000 402328 41730
CHHABRA TPS 1amp 2 RRVUNL THERMAL-COAL 50000 305946 36700
CHHABRA TPS 3 RRVUNL THERMAL-COAL 25000 151536 36700
CHHABRA TPS 4 RRVUNL THERMAL-COAL 25000 155896 36700
RAMGARH GT POWER PROJECT RRVUNL THERMAL-COAL 22050 43177 41800
RAMGARH GAS T P PROJECT 3 RRVUNL THERMAL-GAS 5000 93615 41800
DHOLPUR C C POWER PROJECT RRVUNL THERMAL-R-LNG 33000 9486 46110
MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 14000 20855 34192
MINI MICRO HYDEL (MMH) P S RRVUNL HYDRO-HYDRO 2385 851 37800
KALISINDH TPP 1 RRVUNL THERMAL-COAL 60000 341543 45000
KALISINDH TPP 2 RRVUNL THERMAL-COAL 60000 211588 45000
KHARA HEP UPJVNL HYDRO-HYDRO 7200 26654 7200
MATATILLA HEP UPJVNL HYDRO-HYDRO 3060 12219 6500
OBRA HEP UPJVNL HYDRO-HYDRO 9900 21517 6300
RIHAND UPJVNL HYDRO-HYDRO 30000 57369 5500
ANPARA A TPS UPRVUNL THERMAL-COAL 63000 317536 27000
ANPARA B TPS UPRVUNL THERMAL-COAL 100000 705605 22700
ANPARA D UPRVUNL THERMAL-COAL 100000 300158 39800
HARDUAGANJ TPS UPRVUNL THERMAL-COAL 16500 45817 49200
HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 50000 304389 46600
OBRA A TPS UPRVUNL THERMAL-COAL 28800 13158 34000
OBRA B TPS UPRVUNL THERMAL-COAL 100000 328124 21900
Page 34
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) PANKI TPS UPRVUNL THERMAL-COAL 21000 66488 50300
PARICHHA TPS UPRVUNL THERMAL-COAL 22000 38762 49400
PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 42000 231931 45600
PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 50000 276722 50400
CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 24000 70845 8290
CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 14400 75366 8390
DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 3375 9595 12080
DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 5100 18701 10520
KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4140 17359 12330
KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 12000 33001 9420
KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 3000 11953 8320
TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 9000 33983 12460
MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 30400 124510 16110
RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 19800 17897 10550
MPUR UTTARAKHAND JVNL HYDRO-HYDRO 930 5121 19200
PATHRI UTTARAKHAND JVNL HYDRO-HYDRO 2040 11636 14200
GALOGI UTTARAKHAND JVNL HYDRO-HYDRO 300 648 12500
PRIVATE SECTOR
MGTPP CLP INDIA PVT LTD THERMAL-COAL 132000 268902 41940
SHRINAGAR HEP ALAKNANDA HPCL HYDRO-HYDRO 33000 127414 48800
GAMA INFRAPROP CCPP GAMA INFRAPROP PVT THERMAL-GAS 22500 52686 47000
PPGCL (BARA) JP POWER VENTURES LTD THERMAL-COAL 198000 448200 38500
MALANA HEP MALANA PCL HYDRO-HYDRO 8600 26354 29792
MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 10000 30369 32580
ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 19200 56347 36079
KASHANG HEP H P PCL HYDRO-HYDRO 19500 5034 29200
BASPA-II HEP HBPCL HYDRO-HYDRO 30000 132769 13600
KARCHAM WANGTOO HEP HBPCL HYDRO-HYDRO 100000 434386 36600
RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 108000 582600 43700
RITHALA COMBI CY POWER PLANT TATA POWER DDL THERMAL-GAS 9480 000 11900
RAJPURA TPS NABHA POWER LTD THERMAL-GAS 140000 901484 39000
TALWANDI SABO POWER LTD TALWANDI SABO POWER LTD THERMAL-COAL 198000 636040 49548
ROJA THERMAL POWER STATION ROJA POWER SCL THERMAL-COAL 120000 727200 43400
KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 34400 63400
BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 36000 62600
MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 38200 60800
UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 37900 61500
KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 42300 58800
LALITPUR PGCL BAJAJ ENERGY PVT LTD THERMAL-COAL 198000 359400 47300
PRAYAGRAJ PGCL PRAYAGRAJ PGCL THERMAL-COAL 132000 448200 38595
KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 132000 783182 33438
WESTERN REGION
CENTRAL SECTOR
INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 100000 325333 23892
OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 52000 141663 34001
GANDHAR CCPP NTPC LTD THERMAL-GAS 65739 221924 28700
KAWAS CCPP NTPC LTD THERMAL-GASN 65620 167929 27000
KORBA I amp II NTPC LTD THERMAL-COAL 210000 1499171 20500
KORBA III NTPC LTD THERMAL-COAL 50000 358746 26600
SIPAT STPS I NTPC LTD THERMAL-COAL 198000 1479902 26800
SIPAT STPS II NTPC LTD THERMAL-COAL 100000 766549 26500
VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 126000 693142 25800
VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 100000 608781 23800
VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 100000 673475 27600
VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 100000 655924 32900
VINDHYACHAL STPS V NTPC LTD THERMAL-COAL 50000 328265 31700
MOUDA I NTPC LTD THERMAL-COAL 100000 343130 44500
MOUDA Ii NTPC LTD THERMAL-COAL 66000 40637 39900
RATNAGIRI GAS amp POWER PVT LTD RGPPL THERMAL-GAS 196708 442485 47000
KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 000 24729
TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 32000 201227 10740
Page 35
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 365122 19069
TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 787444 29324
STATE SECTOR
GSEG-HAZIRA15610 MW GUJARAT S ENEGEN LTD THERMAL-GAS 15610 1805 28200
GSEG-HAZIRA35143 MW GUJARAT S ENEGEN LTD THERMAL-GAS 35130 22276 51300
GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 21978 51800
AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 13929 26100
KORBA TPS EAST CSPGCL THERMAL-COAL 44000 198673 33880
DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 365808 27570
KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 316500 30420
HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 532878 19410
CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 515 58300
MTTPS CHAMPA U-I CSPGCL THERMAL-COAL 50000 220376 39000
MTTPS CHAMPA U-II CSPGCL THERMAL-COAL 50000 23709 10000
SHP GANGREL CSPGCL HYDRO-HYDRO 1000 2350 36790
BANGO HEP CSPGCL HYDRO-HYDRO 12000 14662 8900
MHP KORBA WEST CSPGCL HYDRO-HYDRO 170 859 38190
SIKASAR HEP CSPGCL HYDRO-HYDRO 700 418 26870
DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8843 74500
DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 19446 51500
GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 66388 71600
GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127488 41300
KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 96072 43900
KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 29841 56400
SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 184966 58800
UKAI 1-5 GSECL THERMAL-COAL 85000 204891 46900
UKAI TPS 6 GSECL THERMAL-COAL 50000 284448 48200
WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 271999 58300
WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 82808 44100
KADANA HPS GSECL HYDRO-HYDRO 24200 34433 16800
UKAI HPS GSECL HYDRO-HYDRO 30500 40585 6100
TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 123000 11500
BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 8900 10900
BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 7200 27500
JHINNA HPS MPPGCL HYDRO-HYDRO 2000 9700 18500
RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 44300 3400
GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 17300 4600
SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 4100 16900
MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 14600 27000
PENCH HPS MPPGCL HYDRO-HYDRO 16000 23700 8100
RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 3000 16900
AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 134400 35100
SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 283800 38700
SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 344600 34300
SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 111600 61600
SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 211800 58000
SSTPS PH-I MPPGCL THERMAL-COAL 120000 233100 84300
BHUSAWAL TPS MSPGCL THERMAL-COAL 142000 566258 51100
CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1365682 33700
KHAPERKHEDA MSPGCL THERMAL-COAL 134000 706207 39100
KORADI TPS MSPGCL THERMAL-COAL 62000 443206 42000
NASIK TPS MSPGCL THERMAL-COAL 63000 297275 47000
PARLI TPS MSPGCL THERMAL-COAL 113000 175934 71600
PARAS MSPGCL THERMAL-COAL 50000 267931 38700
URAN CCPP MSPGCL THERMAL-GAS 67200 320330 30600
KOYANA MSPGCL HYDRO-HYDRO 195600 328155 13100
SMALL HYDRO POWER PLANTS MSPGCL HYDRO-HYDRO 45400 93062 30500
BHIRA MSPGCL HYDRO-HYDRO 8000 10046 8400
TILLARI MSPGCL HYDRO-HYDRO 8900 10584 3100
SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 233298 20500
SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 87633 20500
PRIVATE SECTOR
Page 36
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 81282 46750
JNSTPP(JAYPEE NIGRIE) JP POWER VENTURES LTD THERMAL-COAL 132000 726695 29310
MB POWER MB POWER THERMAL-COAL 120000 345632 38310
ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 754922 28671
ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 780761 23495
ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 198000 1263784 32090
ADANI POWER MAHARA ADANI POWER LTD THERMAL-COAL 330000 1666191 34124
AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 170065 36827
SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 252035 45129
ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 458551 36000
ESSAR POWER MP LTD ESSAR POWER MP LTD THERMAL-COAL 60000 243040 28600
VEDANTA LTD (P P -I) VEDANTA LTD THERMAL-GAS 3000 15044 24000
VEDANTA LTD (P P -II) VEDANTA LTD THERMAL-GAS 3000 21293 24000
PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 8234600 24000
165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 5850 64390
145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 68717 40349
SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 132655 28776
SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 144686 38567
MUNDRA UMPPCOASTAL GUJARAT POWER
LTD THERMAL-IMP COAL 400000 2530300
23900
LANCO AMARKANTAK TPP PATHADIH
U-ILANCO AMARKAN POWER LTD THERMAL-COAL 30000 195500
29200
LANCO AMARKANTAK TPP PATHADIH
U-IILANCO AMARKAN POWER LTD THERMAL-COAL 30000 206900
27600
BARADARHA TPS D B POWER LTD THERMAL-COAL 120000 677373 29200
JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 405000 28900
JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 453000 40500
DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 339437 40700
TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 293400 44000
TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 137200 37000
TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 174900 44000
BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 92900 14100
BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23700 34300
KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 27600 48300
CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2530300 23900
BHANDARDRA HEP -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 2475 54900
SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 161400 26500
SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 445000 39000
SOTHERN REGION
CENTRAL SECTOR
NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 325699 54820
NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 305532 39880
NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 998805 38510
NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 113016 54070
NEYVELI TAMILNADU POWER LTD JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 625274 42200
VALLUR TPS NTPC TECL THERMAL-COAL 150000 856438 42350
R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 1493 84300
RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1502919 29400
RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 341291 31800
SIMHADRI I NTPC LTD THERMAL-COAL 100000 688382 36800
SIMHADRI II NTPC LTD THERMAL-COAL 100000 663657 43400
KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 593110 31324
MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 291625 21764
KKNPP-1 amp 2 NPCIL NUCLEAR-NUCLEAR 200000 572609 40948
MINICOY LAKSHADEEP THERMAL-DIESEL 340 770 29600
KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1097 29600
AMINI LAKSHADEEP THERMAL-DIESEL 265 509 29600
ANDROTT LAKSHADEEP THERMAL-DIESEL 219 524 29600
KALPENI LAKSHADEEP THERMAL-DIESEL 175 356 29600
AGATTI LAKSHADEEP THERMAL-DIESEL 195 658 29600
KADMAT LAKSHADEEP THERMAL-DIESEL 190 414 29600
KILTAN LAKSHADEEP THERMAL-DIESEL 150 269 29600
CHETLET LAKSHADEEP THERMAL-DIESEL 100 139 29600
BITRA LAKSHADEEP THERMAL-DIESEL 043 024 29600
BANGARAM LAKSHADEEP THERMAL-DIESEL 018 009 29600
Page 37
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) STATE SECTOR
Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 721811 46500
Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 50000 336142 46500
RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 237358 46500
RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 239926 46500
RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 124500 46500
SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 62109 46500
UPPER SILERU APGENCO HYDRO-HYDRO 24000 33000 46500
LOWER SILERU APGENCO HYDRO-HYDRO 46000 81066 46500
DONKARAI APGENCO HYDRO-HYDRO 2500 6007 46500
PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 1262 46500
CHETTIPETA APGENCO HYDRO-HYDRO 100 214 46500
MUCHKUND APGENCO HYDRO-HYDRO 12000 37571 46500
NAGARJUNASAGAR RCPH APGENCO HYDRO-HYDRO 9000 606 46500
TUNGABHADRA HES amp HAMPI(AP
Share)
APGENCO HYDRO-HYDRO 7200 6100 46500
KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 352232 42600
KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 288131 32500
KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 319272 46500
RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 40073 44300
KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 308317 46000
KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 308963 51300
SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 61004 76600
NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 17960 75300
PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 20873 58300
POCHAMPAD-I TSPGENCO HYDRO-HYDRO 2700 5455 29800
POCHAMPAD-II TSPGENCO HYDRO-HYDRO 900 1932 40700
NIZAMSAGAR TSPGENCO HYDRO-HYDRO 1000 1126 53400
RAICHUR TPS 1 to 7 KPCL THERMAL-COAL 147000 890866 43800
RAICHUR TPS 8 KPCL THERMAL-COAL 25000 159523 48200
BELLARI TPS 1 KPCL THERMAL-COAL 50000 318679 51100
BELLARI TPS 2 KPCL THERMAL-COAL 50000 232347 55600
BELLARI TPS 3 KPCL THERMAL-COAL 70000 47565 34400
BHADRA PH KPCL HYDRO-HYDRO 3920 2369 45900
GERUSUPPA PH KPCL HYDRO-HYDRO 24000 26990 22000
GHAT PRABHA HEP KPCL HYDRO-HYDRO 3200 4777 25300
KADRA HPS KPCL HYDRO-HYDRO 15000 16889 26800
NAGJHARI KPCL HYDRO-HYDRO 90000 155159 9800
KODASALLI DPH KPCL HYDRO-HYDRO 12000 14854 19200
MUNIRA+MGH+SPH+SPH KPCL HYDRO-HYDRO 22640 48211 7900
SHARAVATHY HPS KPCL HYDRO-HYDRO 108550 276215 5400
ALMATTI DPH KPCL HYDRO-HYDRO 29000 39611 24600
VARAHI UGPH KPCL HYDRO-HYDRO 46000 71368 15600
IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 17196 15300
IDUKKI HPS KSEB HYDRO-HYDRO 78000 137905 15300
KAKKAD HPS KSEB HYDRO-HYDRO 5000 13063 15300
KALLADA HPS KSEB HYDRO-HYDRO 1500 4436 15300
KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 46544 15300
KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 635 15300
LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 30822 15300
MALANKARA HPS KSEB HYDRO-HYDRO 1050 2474 15300
MATTUPETTY KSEB HYDRO-HYDRO 200 230 15300
MALAMPUZHA KSEB HYDRO-HYDRO 250 063 15300
CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 864 15300
URUMI ST I amp II KSEB HYDRO-HYDRO 615 903 15300
LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 248 15300
NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7765 19625 15300
PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 16601 15300
PANNIAR HPS KSEB HYDRO-HYDRO 3240 6217 15300
PORINGALKUTHU KSEB HYDRO-HYDRO 3600 10052 15300
PORINGALKUTHU LBE KSEB HYDRO-HYDRO 1600 9438 15300
PEPPARA KSEB HYDRO-HYDRO 300 395 15300
POOZHITHODE KSEB HYDRO-HYDRO 480 1045 15300
Page 38
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) PEECHI KSEB HYDRO-HYDRO 125 040 15300
RANI-PERUNADU KSEB HYDRO-HYDRO 400 585 15300
SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 79783 15300
SENGULAM HPS KSEB HYDRO-HYDRO 5120 11558 15300
SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 16711 15300
VILANGAD KSEB HYDRO-HYDRO 750 1578 15300
BARAPOLE KSEB HYDRO-HYDRO 1500 1932 15300
VELLATHOOVAL KSEB HYDRO-HYDRO 360 305 15300
CHIM0NY KSEB HYDRO-HYDRO 250 156 15300
ADYANPARA KSEB HYDRO-HYDRO 350 501 15300
BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 554 15300
KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 3801 15300
KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 23132 32800
ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 14416 62280
METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 523970 62280
METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 321270 62280
NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 336575 62280
NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 591240 62280
TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 508966 62280
KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 30897 62280
VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 18720 90699 62280
KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 33593 62280
BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 1047 62280
PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 1250 62280
PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 330 62280
MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 4897 62280
MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 032 62280
KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15681 62280
KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 40608 62280
KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 21342 62280
KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 4717 62280
KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4322 62280
KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2399 62280
METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 4416 62280
METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 8035 62280
BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2187 62280
BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2359 62280
BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2511 62280
BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 1949 62280
BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 1819 62280
POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 172 62280
SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 241 62280
MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 026 62280
THIRUMOORTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 136 62280
PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 9309 62280
VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 353 62280
SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 4192 62280
PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 6571 62280
SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 1186 62280
SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6319 62280
ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 6122 62280
KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 28674 62280
SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 18381 62280
SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 4258 62280
KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 12680 62280
KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4201 62280
ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 000 62280
PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 19175 62280
AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 078 62280
BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 504 62280
BHAVANI KATTALAI (BKB)(IIIampIII BB I amp II)TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 5847 62280
PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 000 62280
Page 39
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) SRI DAMODARAM STPS APPDCL THERMAL-COAL 160000 808108 36300
PRIVATE SECTOR
KARUPPUR TANJORE LANCO TANJORE PCL THERMAL-GAS 12000 48096 28770
SIMHAPURI ENERGY LTD SIMHAPURI ENERGY LTD THERMAL-COAL 60000 143900 39100
JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 7111 45500
SBU 1 JSW ENERGY LTD
VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 26000 159100
43300
SBU 2 JSW ENERGY LTD
VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 60000 247900
42800
LANCO KPLLANCO KONDAPALLI POWER
LTDTHERMAL-GAS 36814 85060
25776
LANCO KPL STG -IILANCO KONDAPALLI POWER
LTDTHERMAL-GAS 36600 12979
46330
LANCO KPL STG -IIIALANCO KONDAPALLI POWER
LTDTHERMAL-GAS 37100 85710
46330
LANCO KPL STG -III BLANCO KONDAPALLI POWER
LTDTHERMAL-GAS 37100 43639
46330
HINDUJA NATIONAL PCL HINDUJA NATIONAL PCL THERMAL-COAL 104000 303000 38200
MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 121164 49940
UDUPI POWER COR LTD ADANI POWER LTD THERMAL-COAL 120000 754613 42500
SPECTRUM POWER GENERATION
LTD SPECTRUM PG LTD THERMAL-GASN 20525 9256812
34952
TAQA NEYVELI POWER COM PVT
LTD TAQA NEYVELI THERMAL-LIG 25000 5840
34500
ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 251000 51000
ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 207860 36800
GMR VEMAGIRI POWER GENERATION
LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 30117
46450
EASTERN REGION
CENTRAL SECTOR
MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 64675 53113
MTPS STAGE - II KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 39000 1432 69138
BOKARO `B` TPS DVC THERMAL-COAL 63000 145670 31539
MEJIA TPS U 1-3 DVC THERMAL-COAL 63000 348298 31552
MEJIA TPS U 4 DVC THERMAL-COAL 21000 116099 34997
MEJIA TPS U 5-6 DVC THERMAL-COAL 50000 276427 35976
MEJIA TPS U 7-8 DVC THERMAL-COAL 100000 552854 36991
DURGAPUR STEEL TPS DVC THERMAL-COAL 100000 665550 39323
DURGAPUR TPS DVC THERMAL-COAL 21000 59270 35416
RAGHUNATHPUR TPS DVC THERMAL-COAL 120000 201650 35326
MAITHON HYDEL STA DVC HYDRO-HYDRO 6320 12200 17984
CHANDRAPURA TPSU1-3 DVC THERMAL-COAL 42000 257610 35095
CHANDRAPURA TPSU7-8 DVC THERMAL-COAL 50000 306673 34987
KODERMA TPS DVC THERMAL-COAL 100000 380180 38131
PANCHET HPS DVC HYDRO-HYDRO 8000 13360 17984
TILLAYA HPS DVC HYDRO-HYDRO 400 1410 17984
RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34700 35400
TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 277300 23200
TLDP -III NHPC LTD HYDRO-HYDRO 13200 55400 62000
TLDP -IV NHPC LTD HYDRO-HYDRO 16000 60300 25600
FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 957219 33700
FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 308943 41000
BONGAINGAON TPS NTPC LTD THERMAL-COAL 25000 153663 58600
KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 542277 34200
KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 942591 34200
BARH-II NTPC LTD THERMAL-COAL 132000 728021 44500
TALCHER TPS NTPC LTD THERMAL-COAL 46000 335521 30100
TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 702319 25600
TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1436521 24700
STATE SECTOR
BTPS(RampM) BIHAR STATE PGCL THERMAL-COAL 22000 12142 39700
BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 98331 10602
HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 50593 9482
CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 19689 2605
RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 53192 6033
UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 147208 14637
Page 40
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 60353 4519
IB TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 288567 25000
J P H GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 210 038 61100
MEYONG CHU GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 400 1086 61100
TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 122667 38200
DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 214339 43321
KOLAGHAT THERMAL POWER
STATION
WEST BENGAL PDCL THERMAL-COAL 126000 538269 31603
BAKRESHWAR THERMAL POWER
PLANT
WEST BENGAL PDCL THERMAL-COAL 105000 634876 32154
BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 45000 166855 33299
SANTHALDIH THERMAL POWER
STATION
WEST BENGAL PDCL THERMAL-COAL 50000 336442 34932
SAGARDIGHI THERMAL POWER
PROJECT
WEST BENGAL PDCL THERMAL-COAL 160000 423121 34705
JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 20344 68900
RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 24559 68900
TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 4623 68900
PURULIA PUMPED STORAGE
PROJECT
WEST BENGAL SEDCL HYDRO-HYDRO 90000 108816 68900
MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2768 68900
PRIVATE SECTOR
CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 49474 20230
CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 555500 70200
HALDIA ENERGY HALDIA ENERGY LTD THERMAL-COAL 60000 371000 50400
DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3688 63400
KAMALANGA TPS GMR KAMALANGA ENERGY LTD THERMAL-COAL 105000547670
33300
ADHUNIK POWER U-1 ADHUNIK POWER THERMAL-COAL 27000 158 44060
ADHUNIK POWER U-2 ADHUNIK POWER THERMAL-COAL 27000 168 44250
VL-JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 332800 23622
JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 43000 45250
JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 71700 37030
JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 70700 35920
JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 71100 38870
JOJOBERA UNIT 5 TATA POWER COM LTD THERMAL-COAL 12000 79300 44560
JOJOBERA UNIT 6 TATA POWER COM LTD THERMAL-WHR 12000 83700 12840
IEL KALINGANAGAR U-I TATA POWER COM LTD THERMAL-WG 6750 33400 22500
IEL KALINGANAGAR U-II TATA POWER COM LTD THERMAL-WG 6750 34800 22500
MAITHON UNIT 1 amp 2 TATA POWER COM LTD THERMAL-COAL 105000 678000 36100
HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 27500 24340
HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 28400 24340
HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 15800 24310
NORTH EASTERN REGION
CENTRAL SECTOR
LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 74100 36600
AGARTALA GT NEEPCO THERMAL-GAS 13500 88611 27210
ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 153111 32310
DOYANG HEP NEEPCO HYDRO-HYDRO 7500 25598 49801
KOPILI HEP NEEPCO HYDRO-HYDRO 20000 98186 11491
KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 19582 20237
KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 10310 17968
RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 124093 22945
TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 10100 17344 39000
STATE SECTOR
HYDRO POWER (122 Stns) ITANAGAR GOVT OF ARUNACHAL
PRADESHHYDRO-HYDRO 6971 6217270
24600
KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39514 17337
LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 82327 36810
NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 33318 48290
MYNTRIANG SHEP ST II ASSAM POWER GENCO HYDRO-HYDRO 300 567 35776
LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 9130 49200
LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 012 49200
DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 022 49200
TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 000 49200
UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 4990 16000
UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 6476 37000
UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 16494 14600
UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 3600 9556 15000
SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 758 8000
MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44070 44800
KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 154 41400
TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 091 41400
MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 411 41400
MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 394 41400
KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 760 41400
SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 3264 41400
LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 044 41400
BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 18953 28000
ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 43585 28200
GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 4080 11100
Note
LIG Lignite N Naptha WHR Waste Heat Recovery
Page 41
File NoCEA-CH-14-1142018-Coordination Division
(As on 31102018)
Coal Gas Diesel Total
State 501000 23540 000 524540 000 167360 4875 696775
Private 387388 381318 3680 772386 000 000 693073 1465459
Central 167456 000 000 167456 12727 000 25000 205183
Sub-Total 1055844 404858 3680 1464382 12727 167360 722948 2367417
State 508250 000 000 508250 000 247993 4022 760265
Private 83945 83182 000 167127 000 000 375048 542175
Central 195612 000 000 195612 14873 000 1000 211485
Sub-Total 787807 83182 000 870989 14873 247993 380070 1513925
State 502000 000 12792 514792 000 359980 15533 890305
Private 195850 000 2520 198370 000 000 1275640 1474010
Central 282920 000 000 282920 69800 000 000 352720
Sub-Total 980770 000 15312 996082 69800 359980 1291173 2717035
State 000 000 15996 15996 000 188150 15402 219548
Private 61500 17400 000 78900 000 000 20899 99799
Central 114322 35958 000 150280 36200 000 5000 191480
Sub-Total 175822 53358 15996 245176 36200 188150 41301 510827
State 432000 52408 000 484408 000 220320 12270 716998
Private 483767 50310 41170 575247 000 000 1130984 1706231
Central 448952 000 000 448952 144800 000 18190 611942
Sub-Total 1364719 102718 41170 1508607 144800 220320 1161444 3035171
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 000 000
Central 10000 000 000 10000 000 000 000 10000
Sub-Total 10000 000 000 10000 000 000 000 10000
State 000 3250 000 3250 000 000 000 3250
Private 000 000 000 000 000 000 171 171
Central 24840 000 000 24840 8600 000 000 33440
Sub-Total 24840 3250 000 28090 8600 000 171 36861
178400 000 000 178400 45000 000 000 223400
State 1943250 79198 28788 2051236 000 1183803 52102 3287141
Private 1212450 532210 47370 1792030 000 000 3495815 5287845
Central 1422502 35958 000 1458460 332000 000 49190 1839650
Grand Total 4578202 647366 76158 5301726 332000 1183803 3597107 10414636
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
SOUTHERN REGION
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
State Ownership Sector
Modewise breakup
Grand TotalThermal RES
(MNRE)Nuclear
Hydro
(Renewable)
Kerala
Tamil Nadu
NLC
Puducherry
Central - Unallocated
Total (Southern
Region)
Andhra Pradesh
Telangana
Karnataka
File NoCEA-CH-14-1142018-Coordination Division
(As on 31102018)
Coal Gas Diesel Total
State 71000 000 000 71000 000 000 7070 78070
Private 28100 000 000 28100 000 000 25545 53645
Central 291433 000 000 291433 000 11000 000 302432
Sub-Total 390533 000 000 390533 000 11000 32615 434147
State 42000 000 000 42000 000 13000 405 55405
Private 73000 000 000 73000 000 000 3207 76207
Central 39374 000 000 39374 000 6100 000 45474
Sub-Total 154374 000 000 154374 000 19100 3612 177086
State 540000 10000 000 550000 000 98600 9195 657795
Private 242500 000 000 242500 000 000 34452 276952
Central 76077 000 000 76077 000 41000 000 117077
Sub-Total 858577 10000 000 868577 000 139600 43647 1051824
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 000 000
Central 698504 000 000 698504 000 18620 000 717124
Sub-Total 698504 000 000 698504 000 18620 000 717124
State 42000 000 000 42000 000 206192 630 248822
Private 293900 000 000 293900 000 000 21648 315548
Central 163390 000 000 163390 000 8900 1000 173290
Sub-Total 499290 000 000 499290 000 215092 23278 737660
State 000 000 000 000 000 36000 5211 41211
Private 000 000 000 000 000 39900 001 39901
Central 8703 000 000 8703 000 6400 000 15103
Sub-Total 8703 000 000 8703 000 82300 5212 96215
110183 000 000 110183 000 8501 000 118684
State 695000 10000 000 705000 000 353792 22511 1081303
Private 637500 000 000 637500 000 39900 84853 762253
Central 1387664 000 000 1387664 000 100520 1000 1489184
Grand Total 2720164 10000 000 2730164 000 494212 108364 3332740
(As on 31102018)
Coal Gas Diesel Total
State 000 32821 000 32821 000 10000 3001 45822
Private 000 2450 000 2450 000 000 1680 4130
Central 27902 43556 000 71458 000 36851 000 108309
Sub-Total 27902 78827 000 106729 000 46851 4681 158261
State 000 000 000 000 000 000 10710 10710
Private 000 000 000 000 000 000 539 539
Central 2470 4682 000 7152 000 11800 000 18952
Sub-Total 2470 4682 000 7152 000 11800 11249 30201
State 000 000 000 000 000 32200 3103 35303
Private 000 000 000 000 000 000 006 006
Central 3040 10969 000 14009 000 7446 000 21455
Sub-Total 3040 10969 000 14009 000 39646 3109 56764
State 000 16950 000 16950 000 000 1601 18551
Private 000 000 000 000 000 000 009 009
Central 3740 43695 000 47435 000 7077 500 55012
Sub-Total 3740 60645 000 64385 000 7077 2110 73572
State 000 000 3600 3600 000 000 545 4145
Private 000 000 000 000 000 000 217 217
Central 3140 7157 000 10297 000 9677 000 19974
Sub-Total 3140 7157 3600 13897 000 9677 762 24336
State 000 000 000 000 000 000 3067 3067
Private 000 000 000 000 000 000 100 100
Central 2140 4893 000 7033 000 5860 000 12893
Sub-Total 2140 4893 000 7033 000 5860 3167 16060
State 000 000 000 000 000 000 3647 3647
Private 000 000 000 000 000 000 020 020
Central 2070 4046 000 6116 000 9913 000 16029
Sub-Total 2070 4046 000 6116 000 9913 3667 19696
7500 6362 000 13862 000 14376 000 28238
State 000 49771 3600 53371 000 42200 25674 121245
Private 000 2450 000 2450 000 000 2571 5021
Central 52002 125360 000 177362 000 103000 500 280862
Grand Total 52002 177581 3600 233183 000 145200 28745 407128
Central - Unallocated
Total (Eastern
Region)
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
NORTH-EASTERN REGION
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
State Ownership Sector
Modewise breakup
Grand TotalThermalNuclear
Bihar
Jharkhand
West Bengal
DVC
Odisha
Sikkim
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
EASTERN REGION
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
Ownership Sector
Modewise breakup
Grand TotalThermalNuclear
Hydro
(Renewable)
RES
(MNRE)
Manipur
Nagaland
State
Mizoram
Central - Unallocated
Total (North-
Eastern Region)
Hydro
(Renewable)
RES
(MNRE)
Assam
Arunachal Pradesh
Meghalaya
Tripura
File NoCEA-CH-14-1142018-Coordination Division
(As on 31102018)
Coal Gas Diesel Total
State 000 000 4005 4005 000 000 525 4530
Private 000 000 000 000 000 000 146 146
Central 000 000 000 000 000 000 510 510
Sub-Total 000 000 4005 4005 000 000 1181 5186
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 075 075
Central 000 000 000 000 000 000 000 000
Sub-Total 000 000 000 000 000 000 075 075
State 000 000 4005 4005 000 000 525 4530
Private 000 000 000 000 000 000 221 221
Central 000 000 000 000 000 000 510 510
Grand Total 000 000 4005 4005 000 000 1256 5261
19
Andaman amp
Nicobar
lakshadweep
Total (Islands)
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
State Ownership Sector
Modewise breakup
Grand TotalThermalNuclear
Hydro
(Renewable)
RES
(MNRE)
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
ISLANDS
File NoCEA-CH-14-1142018-Coordination Division
SrNo Contents Page
1 Executive summary of Target and Achievement of Transmission Lines during 2018-19
20(1)
2 List of Transmission Lines CommissionedReady for commissioning during Oct-2018 20(2)
Section C - Transmission Lines
File NoCEA-CH-14-1142018-Coordination Division
Executive summary of Target and Achievement of Transmission Lines during 2018-19 As on Oct-18
(All figures in circuit kms)
Centr
al S
ecto
r
Sta
te S
ecto
r
JV
Private
Secto
r
To
tal
Centr
al S
ecto
r
Sta
te S
ecto
r
JV
Private
Secto
r
To
tal
Centr
al S
ecto
r
Sta
te S
ecto
r
JV
Private
Secto
r
To
tal
Centr
al S
ecto
r
Sta
te S
ecto
r
JV
Private
Secto
r
To
tal
Centr
al S
ecto
r
Sta
te S
ecto
r
JV
Private
Secto
r
To
tal
Cen
tral S
ecto
r
Sta
te S
ecto
r
JV
Pri
vate
Secto
r
Gra
nd
To
tal
0 0 0 0 0 0 0 0 4692 766 827 6285 3045 5906 980 9931 553 5878 0 6431 8290 12550 1807 22647
Oct18 Programme 0 0 0 0 0 0 0 0 300 0 0 300 662 90 562 1314 0 723 0 723 962 813 562 2337
Achievement 0 0 0 0 0 0 0 0 729 0 0 729 471 266 0 737 0 401 0 401 1200 667 0 1867
Upto Oct-18 Programme 0 0 0 0 0 0 0 0 3004 416 0 3420 1350 3109 562 5021 481 4346 0 4827 4835 7871 562 13268
Achievement 0 0 0 0 0 0 0 0 2286 0 178 2464 1436 1783 1595 4814 60 4461 0 4521 3782 6244 1773 11799
20(1)
220 kV Grand Total 800 kV 500 kV
Programme 2018-19
Programme
Achievement
HVDC765 kV 400 kV
File NoCEA-CH-14-1142018-Coordination Division
SlNo Line
Length
(cKM)
1 2 3 4 5 6
1 765 Jharsuguda - Dharamjaygarh line DC PGCIL 296
2 765LILO of Kurnool - Thirvualam line at
CuddapahDC PGCIL 190
3 765 Salem PS - Madhugiri PS line SC PGCIL 243
4 400 Cuddapah - Hindupur line (Q) DC PGCIL 338
5 400LILO of Both Ckt of Bamnauli - Samaypur at
TughlakabadMC PGCIL 114
6 400LILO-Out of Cuddapah - Hindupur line (Q)
(Both Ckts) at NP Kunta ssDC PGCIL 19
1200
7 400LILO of Sterlite - Meramundali at Lapanga
4oo kV ssDC OPTCL 14
8 400 Sterlite - Lapanga line DC OPTCL 37
9 400 TMDC Podili - Sattapenalli line DC APTRANSCO 215
10 230Neyveli 230110 kV ss - Eachangadu
230kV FeederSC TANTRANSCO 1
11 230 NNTPS - Neyveli 230110kV ss DC TANTRANSCO 2
12 220 Ajmer (400 kV) - Bherunda (TK) DC RVPNL 100
13 220 Aligarh - Atrauli line DC UPPTCL 77
14 220 Khandwa - Chhanera line DC MPPTCL 78
15 220LILO of one Ckt of Hadala - Sartanpar line
at Wankaner on MC towersDC GETCO 6
16 220 LILO of one Ckt of Vita - Miraj at Alkud ss DC MSETCL 27
17 220 Mendhigiri - Alkud ss DC MSETCL 110
667
1867
20(2)
Grand Total
2Transmission Lines (220 kV and above) CommissionedReady for commissioning During Oct-2018
As on 31-10-18
Voltage
Level (kV)Name of Transmission Lines
Circuit
Type
Executing
Agency
CENTRAL SECTOR
Total of CENTRAL SECTOR
STATE SECTOR Sector
Total of STATE SECTOR
File NoCEA-CH-14-1142018-Coordination Division
SN Contents Page
1 Executive summary of Target and Achievement of Substations during 2018-19 21(1)
2Sub Stations (220 kV and above) commissionedready for commisssioning during Oct-
201821(2)
Section D - Sub Stations
File NoCEA-CH-14-1142018-Coordination Division
1 Executive summary of Target and Achievement of Substations during 2018-19 As on Oct-18
(All figures in circuit MVA)
Centr
al S
ecto
r
Sta
te S
ecto
r
JV
Private
Secto
r
To
tal
Centr
al S
ecto
r
Sta
te S
ecto
r
JV
Private
Secto
r
To
tal
Centr
al S
ecto
r
Sta
te S
ecto
r
JV
Private
Secto
r
To
tal
Centr
al S
ecto
r
Sta
te S
ecto
r
JV
Private
Secto
r
To
tal
Centr
al S
ecto
r
Sta
te S
ecto
r
JV
Private
Secto
r
To
tal
Cen
tral S
ecto
r
Sta
te S
ecto
r
JV
Pri
vate
Secto
r
Gra
nd
To
tal
3000 0 0 3000 0 0 0 0 22200 0 0 22200 8185 13085 630 21900 740 14760 0 15500 34125 27845 630 62600
Oct18 Programme 0 0 0 0 0 0 0 0 0 0 0 0 1000 1260 630 2890 0 1400 0 1400 1000 2660 630 4290
Achievement 0 0 0 0 0 0 0 0 3000 0 0 3000 1500 3120 0 4620 0 2220 0 2220 4500 5340 0 9840
Upto Oct-18 Programme 0 0 0 0 0 0 0 0 10000 0 0 10000 6130 7435 630 14195 0 9670 0 9670 16130 17105 630 33865
Achievement 0 0 0 0 0 0 0 0 14000 0 0 14000 9000 7550 630 17180 0 10610 0 10610 23000 18160 630 41790
21(1)
220 kV Grand Total 800 kV 500 kV
Programme 2018-19
Programme
Achievement
HVDC765 kV 400 kV
File NoCEA-CH-14-1142018-Coordination Division
As on 31-10-18
Sl Voltage Ratio Capacity
No (kVkV) (MWMVA)
1 2 3 4 5
1 Cuddapah Ss 765400 PGCIL 3000
2 Tughlakabad SS (GIS) 400220 PGCIL 1500
Total of CENTRAL SECTOR 4500
3 Panki Kanpur (Aug) TF-I 400200 UPPTCL 75
4 Hindupur ss (1st ICT) 400220 APTRANSCO 315
5 Thappagundu ss 400110 TANTRANSCO 600
6 Mendhasal (2nd power TF) 400220 OPTCL 20
7 Jodhpur ss (New) 400220 RVPNL 315
8 Shankarpally 400220 TSTRANSCO 500
9 Podili ss (1st ICT) 400220 APTRANSCO 315
10 Doni (Gadag)SS 400220 KPTCL 1000
11 Porur (Addl TF) 230110 TANTRANSCO 100
12 Anuppankulam (Addl TF) 230110 TANTRANSCO 60
13 Neyveli SS 230110 TANTRANSCO 480
14 Savarkundla (Aug) 22066 GETCO 60
15 Bhuna (Aug) 220132 HVPNL 100
16 Madanpur (Aug) 22066 HVPNL 100
17 Gurgaon Sec-52A (Aug) 22066 HVPNL 160
18 IA Hisar (Aug) 220132 HVPNL 50
19 Narwana (Aug) 220132 HVPNL 60
20 Therubali (3rd Auto TF) 220132 OPTCL 160
21 Halasar ss 220132 RVPNL 160
22 Bansi Siddaharthnagar (Aug) TF-I 220132 UPPTCL 60
23 Hata Kushinagar (New) TF-I 220132 UPPTCL 100
24 Gomti nagar Lucknow (Aug) TF-IV 22033 UPPTCL 60
25 Kanpur Road Lucknow (New) TF-III 22033 UPPTCL 60
26 Asoj (Aug) 22066 GETCO 150
27 Kangasiyali (Aug) 22066 GETCO 60
28 Karmsad (Aug) 22066 GETCO 160
29 Lalpar (Aug) 22066 GETCO 60
TOTAL STATE SECTOR 5340
GRAND TOTAL 9840
21(2)
PRIVATE SECTOR
CENTRAL SECTOR
STATE SECTOR
2Sub-Stations (220 kV and above) CommissionedReady for commissioning During Oct-2018
Name of Sub StationsExecuting
Agency
File NoCEA-CH-14-1142018-Coordination Division
SN Contents Page
1 Electricity Generation (MU) Targets and Achievements for 2018-19 22
Section E - Electricity Generation
File NoCEA-CH-14-1142018-Coordination Division
Programme Achievement Ach Programme Achievement Ach
Central Sector 35160700 3028100 3162321 10443 20144400 21150469 10499
State Sector 35132000 3010000 3017260 10024 19922100 19549030 9813
PvtIPP Sector 36999700 3240600 3375603 10417 21598300 20794155 9628
PvtUTL Sector 1857600 164500 180597 10979 1130900 1203107 10638
Total 109150000 9443200 9735781 10310 62795700 62696761 9984
Central Sector 5617600 420900 451004 10715 4193000 4045436 9648
State Sector 6110600 559500 708469 12663 4049400 4433000 10947
PvtIPP Sector 1141800 80500 90122 11195 976400 1021963 10467
PvtUTL Sector 130000 11300 12564 11119 76700 99943 13030
Total 13000000 1072200 1262159 11772 9295500 9600342 10328
Central Sector 3850000 353300 303310 8585 2068900 2203540 10651
Total 3850000 353300 303310 8585 2068900 2203540 10651
Bhutan Import 500000 63300 35395 5592 347000 416660 12007
Central Sector 44628300 3802300 3916635 10301 26406300 27399445 10376
State Sector 41242600 3569500 3725729 10438 23971500 23982030 10004
Pvt Sector 40129100 3496900 3658886 10463 23782300 23119168 9721
Total 126500000 10932000 11336645 10370 74507100 74917303 10055
Provisional based on actual-cum-Assesment
Figs in MU
Cummulative
Achievement
Cummulative
Achievement
Sep-18 Sep-17 Upto Sep-2018 Upto Sep-2017
1073794 748889 7332680 5660929
22
Renewable Energy Generation
Achievement
Oct-2018
1 Electricity Generation (MU) Targets and Achievememts for 2018-19
All India Energy Generation During April 2018- Oct 2018 (MU)
Target (2018-19)April 2018- Oct 2018
Sector
Hydro
Thermal
Nuclear
627957
92955
20689
745071
626968
96003
22035
749173
0
100000
200000
300000
400000
500000
600000
700000
800000
Thermal Hydro Nuclear Total
Programme
Achievement
File NoCEA-CH-14-1142018-Coordination Division
SN Contents Page
1 Energy Power Supply Position (Provisional) for Oct-2018 and during April 2018- Oct 2018 23
2 Peak Power Supply Position (Provisional) for Oct-2018 and during April 2018- Oct 2018 24
3 Energy Power Supply Position (Revised) for Sep-2018 and during April 2018- Sept 2018 25
4 Peak Power Supply Position (Revised) for Sep-2018 and during April 2018- Sept 2018 26
5 Notified Power cuts Restrictions on Industries during Oct-2018 27
6 Power Supply to Agricultural Sector during Oct-2018 28
Section F - Power supply position
File NoCEA-CH-14-1142018-Coordination Division
आकड़ मममलयन यननट नट Figures in MU net
ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied
कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )
चडीगढ़ Chandigarh 108 108 0 00 1055 1055 0 00
दिलली Delhi 2490 2489 1 00 22524 22510 14 01
हरियजणज Haryana 4554 4554 0 00 35205 35205 0 00
दहमजचल परिश Himachal Pradesh 788 787 2 02 5728 5560 168 29
रमम कशमीि Jammu amp Kashmir 1497 1219 278 186 10982 8865 2117 193
परजब Punjab 4418 4418 0 00 38832 38819 13 00
िजरसथजन Rajasthan 6748 6748 0 00 45341 45181 160 04
उतति परिश Uttar Pradesh 10136 9973 164 16 75485 74808 676 09
उततिजखड Uttarakhand 1083 1081 3 03 8395 8310 85 10
उततरी कषतर Northern Region 31822 31375 447 14 243547 240314 3233 13
छततीसगढ़ Chhattisgarh 2454 2453 1 00 16119 16091 28 02
गरिजत Gujarat 11636 11636 0 00 70782 70768 14 00
मधय परिश Madhya Pradesh 5860 5859 1 00 38412 38410 2 00
महजिजषटर Maharashtra 15223 15095 128 08 95489 95355 134 01
िमन औि दिउ Daman amp Diu 216 216 0 00 1523 1523 0 00
िजिि व नगि हवली Dadra amp Nagar Haveli 553 553 0 00 3757 3757 0 00
गोवज Goa 366 366 0 00 2497 2495 2 01
पशचिमी कषतर Western Region 36308 36178 130 04 228579 228398 180 01
आनधर परिश Andhra Pradesh 5860 5854 6 01 37377 37334 43 01
तलगजनज Telangana 6748 6742 6 01 38251 38205 46 01
कनजाटक Karnataka 5842 5835 7 01 39111 39059 52 01
किल Kerala 2116 2096 20 09 14256 14160 96 07
तममल नजड Tamil Nadu 8611 8601 10 01 65742 65666 76 01
पडचिी Puducherry 216 215 1 05 1654 1646 8 05
लकष-दवीप Lakshadweep 4 4 0 0 27 27 0 0
दकषकषणी कषतर Southern Region 29392 29342 50 02 196390 196069 321 02
बबहजि Bihar 2742 2738 4 01 19143 18951 192 10
िजमोिि घजटी ननगम DVC 1712 1698 13 08 13096 12828 268 20
झजिखणड Jharkhand 701 697 4 06 5022 4949 73 15
ओडडशज Odisha 3147 3134 13 04 20224 20192 32 02
पशशचम बगजल West Bengal 4204 4200 4 01 33008 32881 127 04
मसशककम Sikkim 40 40 0 00 279 279 0 01
अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 67 202 188 13 67
परवी कषतर Eastern Region 12547 12507 40 03 90772 90080 692 08
अरणजचल परिश Arunachal Pradesh 67 66 1 09 502 496 7 13
असम Assam 833 809 24 29 6153 5903 250 41
मणणपि Manipur 72 71 1 10 485 478 7 14
मघजलय Meghalaya 147 147 0 00 1043 1042 0 00
ममज़ोिम Mizoram 63 62 1 08 365 359 5 14
नजगजलड Nagaland 76 67 8 110 540 481 59 109
बिपिज Tripura 130 129 1 09 1025 1007 19 18
उततर-परवी कषतर North-Eastern Region 1387 1351 35 25 10113 9766 346 34
समपणण भारत All India 111455 110753 702 06 769399 764627 4773 06
23
ऊराण वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Energy Power Supply Position Report (Provisional)
राजयStateअकरबर2018 October2018 अपरल2018 -अकरबर2018 April2018 to October2018
ऊरजा पनत ा म कमी ऊरजा पनत ा म कमीEnergy not Supplied
Excludes energy exported to Bangladesh
Energy not Supplied
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
File NoCEA-CH-14-1142018-Coordination Division
अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met
कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )
चडीगढ़ Chandigarh 217 217 0 00 369 369 0 00
दिलली Delhi 4713 4713 0 00 7016 7016 0 00
हरियजणज Haryana 7948 7948 0 00 10270 10270 0 00
दहमजचल परिश Himachal Pradesh 1520 1520 0 00 1520 1520 0 00
रमम कशमीि Jammu amp Kashmir 2836 2269 567 200 2951 2361 590 200
परजब Punjab 7979 7979 0 00 12638 12638 0 00
िजरसथजन Rajasthan 11450 11450 0 00 11698 11698 0 00
उतति परिश Uttar Pradesh 17434 16745 688 39 20498 20062 436 21
उततिजखड Uttarakhand 1943 1943 0 00 2143 2143 0 00
उततरी कषतर Northern Region 50659 49635 1024 20 63166 61726 1440 23
छततीसगढ़ Chhattisgarh 4414 4268 146 33 4414 4268 146 33
गरिजत Gujarat 18148 18130 19 01 18148 18130 19 01
मधय परिश Madhya Pradesh 11356 11317 39 03 11356 11317 39 03
महजिजषटर Maharashtra 23864 23159 705 30 23864 23254 610 26
िमन औि दिउ Daman amp Diu 342 341 1 02 357 356 1 02
िजिि व नगि हवली Dadra amp Nagar Haveli 784 780 4 05 816 815 1 01
गोवज Goa 536 536 0 00 596 596 0 00
पशचिमी कषतर Western Region 56548 55695 853 15 56548 55695 853 15
आनधर परिश Andhra Pradesh 9435 9435 0 00 9435 9435 0 00
तलगजनज Telangana 10603 10603 0 00 10815 10815 0 00
कनजाटक Karnataka 10741 10741 0 00 10741 10741 0 00
किल Kerala 3727 3644 83 22 4050 3997 53 13
तममल नजड Tamil Nadu 14747 14333 414 28 15029 14981 47 03
पडचिी Puducherry 363 362 1 03 420 400 19 46
लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0
दकषकषणी कषतर Southern Region 45279 45226 53 01 45946 45684 262 06
बबहजि Bihar 4945 4945 0 00 5050 5045 5 01
िजमोिि घजटी ननगम DVC 2729 2729 0 00 2874 2874 0 00
झजिखणड Jharkhand 1260 1260 0 00 1339 1284 55 41
ओडडशज Odisha 5624 5224 400 71 5624 5357 268 48
पशशचम बगजल West Bengal 8775 8775 0 00 9130 9123 7 01
मसशककम Sikkim 86 86 0 00 90 90 0 00
अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7
परवी कषतर Eastern Region 22959 22567 392 17 22959 22567 392 17
अरणजचल परिश Arunachal Pradesh 138 125 13 94 138 133 5 37
असम Assam 1785 1704 81 45 1865 1809 56 30
मणणपि Manipur 187 185 2 11 193 186 7 36
मघजलय Meghalaya 336 336 0 00 371 368 2 07
ममज़ोिम Mizoram 99 97 2 20 103 98 4 41
नजगजलड Nagaland 134 131 3 22 156 138 18 117
बिपिज Tripura 269 269 0 00 298 293 5 17
उततर-परवी कषतर North-Eastern Region 2790 2700 90 32 2967 2850 117 39
समपणण भारत All India 172945 170604 2341 14 177022 175528 1494 08
24
अधिकतम वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Peak Power Supply Position Report (Provisional)
आकड़ मगज वजट नट Figures in MW netअपरल2018 -अकरबर2018 April2018 to October2018
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
मजग की पनता म कमी Demand not Met
Excludes the supply to Bangladesh
राजयStateअकरबर2018 October2018
मजग की पनता म कमी Demand not Met
File NoCEA-CH-14-1142018-Coordination Division
आकड़ मममलयन यननट नट Figures in MU net
ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied
कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )
चडीगढ़ Chandigarh 141 141 0 00 947 947 0 00
दिलली Delhi 2925 2924 1 00 20034 20021 13 01
हरियजणज Haryana 4794 4794 0 00 30651 30651 0 00
दहमजचल परिश Himachal Pradesh 876 853 24 27 4940 4773 167 34
रमम कशमीि Jammu amp Kashmir 1520 1246 274 180 9485 7646 1839 194
परजब Punjab 5575 5575 0 00 34414 34401 13 00
िजरसथजन Rajasthan 6202 6201 0 00 38594 38434 160 04
उतति परिश Uttar Pradesh 10211 10124 86 08 65349 64836 513 08
उततिजखड Uttarakhand 1162 1149 13 11 7311 7229 82 11
उततरी कषतर Northern Region 33405 33008 398 12 211725 208939 2786 13
छततीसगढ़ Chhattisgarh 2403 2388 15 06 13665 13638 27 02
गरिजत Gujarat 10122 10122 0 00 59146 59132 14 00
मधय परिश Madhya Pradesh 5492 5491 1 00 32552 32551 1 00
महजिजषटर Maharashtra 13615 13612 3 00 80266 80260 6 00
िमन औि दिउ Daman amp Diu 221 221 0 00 1306 1306 0 00
िजिि व नगि हवली Dadra amp Nagar Haveli 551 551 0 00 3204 3204 0 00
गोवज Goa 339 339 0 00 2131 2128 2 01
पशचिमी कषतर Western Region 32742 32723 19 01 192270 192220 50 00
आनधर परिश Andhra Pradesh 5294 5287 7 01 31518 31480 37 01
तलगजनज Telangana 6279 6272 8 01 31503 31463 40 01
कनजाटक Karnataka 5701 5693 8 01 33269 33225 45 01
किल Kerala 2050 2026 24 12 12140 12063 76 06
तममल नजड Tamil Nadu 8971 8959 12 01 57131 57065 66 01
पडचिी Puducherry 226 224 2 08 1438 1431 7 05
लकष-दवीप Lakshadweep 4 4 0 0 23 23 0 0
दकषकषणी कषतर Southern Region 28520 28460 60 02 166998 166727 271 02
बबहजि Bihar 2839 2793 46 16 16400 16213 188 11
िजमोिि घजटी ननगम DVC 1901 1750 151 79 11384 11130 254 22
झजिखणड Jharkhand 740 723 17 22 4321 4252 69 16
ओडडशज Odisha 2921 2918 3 01 17077 17058 19 01
पशशचम बगजल West Bengal 4902 4879 23 05 28804 28681 123 04
मसशककम Sikkim 39 39 0 01 239 239 0 01
अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 67 173 162 12 67
परवी कषतर Eastern Region 13341 13102 240 18 78225 77573 652 08
अरणजचल परिश Arunachal Pradesh 74 73 1 10 435 429 6 14
असम Assam 950 914 36 38 5320 5094 226 43
मणणपि Manipur 70 69 1 11 414 408 6 15
मघजलय Meghalaya 150 150 0 01 896 896 0 01
ममज़ोिम Mizoram 58 57 1 12 302 297 5 16
नजगजलड Nagaland 80 72 8 104 464 414 50 108
बिपिज Tripura 192 191 1 07 895 878 17 19
उततर-परवी कषतर North-Eastern Region 1575 1527 48 31 8726 8415 311 36
समपणण भारत All India 109584 108819 765 07 657944 653873 4071 06
Energy not Supplied Energy not Supplied
ससतबर2018 September2018 अपरल2018 -ससतबर2018 April2018 to September2018
ऊरजा पनत ा म कमी ऊरजा पनत ा म कमी
Excludes energy exported to Bangladesh
राजयState
ऊराण वरवदयत आपरतण शथिरत ररपोरण (सशोधित) Energy Power Supply Position Report (Revised)
25
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
File NoCEA-CH-14-1142018-Coordination Division
अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met
कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )
चडीगढ़ Chandigarh 293 293 0 00 369 369 0 00
दिलली Delhi 5358 5358 0 00 7016 7016 0 00
हरियजणज Haryana 9008 9008 0 00 10270 10270 0 00
दहमजचल परिश Himachal Pradesh 1466 1466 0 00 1479 1479 0 00
रमम कशमीि Jammu amp Kashmir 2951 2361 590 200 2951 2361 590 200
परजब Punjab 11405 11405 0 00 12638 12638 0 00
िजरसथजन Rajasthan 10612 10612 0 00 11698 11698 0 00
उतति परिश Uttar Pradesh 18346 18121 225 12 20498 20062 436 21
उततिजखड Uttarakhand 1996 1996 0 00 2143 2143 0 00
उततरी कषतर Northern Region 56407 55649 758 13 63166 61726 1440 23
छततीसगढ़ Chhattisgarh 4404 4075 328 75 4404 4136 268 61
गरिजत Gujarat 16963 16963 0 00 17053 16963 90 05
मधय परिश Madhya Pradesh 8811 8771 41 05 8811 8775 36 04
महजिजषटर Maharashtra 22455 22349 106 05 23395 23254 141 06
िमन औि दिउ Daman amp Diu 357 356 1 02 357 356 1 02
िजिि व नगि हवली Dadra amp Nagar Haveli 816 815 1 01 816 815 1 01
गोवज Goa 596 596 0 00 596 596 0 00
पशचिमी कषतर Western Region 52933 52895 38 01 53841 52895 945 18
आनधर परिश Andhra Pradesh 9435 9416 19 02 9435 9416 19 02
तलगजनज Telangana 10815 10815 0 00 10815 10815 0 00
कनजाटक Karnataka 10103 10090 13 01 10690 10688 2 00
किल Kerala 3888 3638 251 64 4050 3997 53 13
तममल नजड Tamil Nadu 14556 14553 3 00 15029 14981 47 03
पडचिी Puducherry 390 372 17 45 420 400 19 46
लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0
दकषकषणी कषतर Southern Region 45542 45428 114 02 45946 45684 262 06
बबहजि Bihar 5050 5045 5 01 5050 5045 5 01
िजमोिि घजटी ननगम DVC 2641 2641 0 00 2874 2874 0 00
झजिखणड Jharkhand 1233 1233 0 00 1339 1284 55 41
ओडडशज Odisha 4906 4906 0 00 5357 5357 0 00
पशशचम बगजल West Bengal 8644 8639 5 01 9130 9123 7 01
मसशककम Sikkim 78 78 0 00 90 90 0 00
अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7
परवी कषतर Eastern Region 22110 22100 10 00 22470 22290 180 08
अरणजचल परिश Arunachal Pradesh 132 130 2 15 138 133 5 37
असम Assam 1865 1809 56 30 1865 1809 56 30
मणणपि Manipur 184 182 2 13 193 186 7 36
मघजलय Meghalaya 317 317 0 00 371 368 2 07
ममज़ोिम Mizoram 95 93 2 23 103 98 4 41
नजगजलड Nagaland 142 138 5 32 156 138 18 117
बिपिज Tripura 296 293 3 10 298 293 5 17
उततर-परवी कषतर North-Eastern Region 2921 2850 71 24 2967 2850 117 39
समपणण भारत All India 177022 175528 1494 08 177022 175528 1494 08
26
मजग की पनता म कमी मजग की पनता म कमी Demand not MetDemand not Met
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
Excludes the supply to Bangladesh
अधिकतम वरवदयत आपरतण शथिरत ररपोरण (सशोधित) Peak Power Supply Position Report (Revised)
आकड़ मगज वजट नट Figures in MW net
राजयStateससतबर2018 September2018 अपरल2018 -ससतबर2018 April2018 to September2018
File NoCEA-CH-14-1142018-Coordination Division
अकरबर2018 October2018अपरल2018 -अकरबर2018 April2018 to October2018
उततरी कषतर Northern Region
चडीगढ़ Chandigarh Data not received Data not received
दिलली Delhi
हरियजणज Haryana
दहमजचल परिश Himachal Pradesh
रमम कशमीि Jammu amp Kashmir Data not received Data not received
परजब Punjab
िजरसथजन Rajasthanउतति परिश Uttar Pradesh
उततिजखड Uttarakhand
पशचिमी कषतर Western Region
छततीसगढ़ Chhattisgarh
गरिजत Gujarat
मधय परिश Madhya Pradesh
महजिजषटर Maharashtra
गोवज Goa
दकषकषणी कषतर Southern Region
आनधर परिश Andhra Pradesh
तलगजनज Telangana
कनजाटक Karnataka
किल Kerala
तममल नजड Tamil Nadu
पडचिी Puducherryपरवी कषतर Eastern Region
बबहजि Bihar
झजिखणड Jharkhand
ओडडशज Odisha
पशशचम बगजल West Bengal
N
o No
tified
Cuts
N
o No
tified
Cuts
27
अकरबर 2018 म इडथरीर पर वरवदयत करौती का वरवरवरण Notified Power CutsRestrictions on Industries during October2018
राजय कषतर State Regionऊराणमाग करौती EnergyDemand Cut
No Notified Cuts No Notified Cuts
File NoCEA-CH-14-1142018-Coordination Division
अकरबर2018 October2018अपरल2018 -अकरबर2018 April2018 to October2018
उततरी कषतर Northern Region
चडीगढ़ Chandigarh Data not received Data not received
दिलली Delhi Data not received Data not received
हरियजणज Haryana 940 hrsday 0709 - 0950 hrsday
दहमजचल परिश Himachal Pradesh No cut imposed on agriculture consumers and uninterrupted
power is being supplied to agriculture sector
HPSEBL has only 2 agriculture consumers and uninterrupted
power is being supplied to agriculture sector
रमम कशमीि Jammu amp Kashmir Data not received Data not received
परजब Punjab 0507 hrsday 0349 - 0844 hrsday
िजरसथजन Rajasthan 0630 hrsday 0630 hrsday
उतति परिश Uttar Pradesh 1825 hrsday 1814 - 1858 hrsday
उततिजखड Uttarakhand 2350 hrsday 2128 - 2357 hrsday
पशचिमी कषतर Western Region
छततीसगढ़ Chhattisgarh 18hoursday 18 hrsday
गरिजत Gujarat 805 hrsday 805 hrsday
मधय परिश Madhya Pradesh Three-Phase Supply(Irrigation)-947 hrs day
Three-Phase (Mixed) Supply - 2311 hrs day
Three-Phase Supply(Irrigation)- 0933 - 0947 hrs day Three-
Phase (Mixed) Supply - 2300 - 2320 hrs day
महजिजषटर Maharashtra Three-Phase Supply(Irrigation)- 9 hrs day
Three-Phase (Mixed) Supply - 24 hrs day
Three-Phase Supply(Irrigation)- 9 hrs day
Three-Phase (Mixed) Supply - 24 hrs day
गोवज Goa No restriction No restriction
दकषकषणी कषतर Southern Region
आनधर परिश Andhra Pradesh 07 hrsday 07 hrsday
तलगजनज Telangana 24 hoursday 24 hoursday
कनजाटक Karnataka 6 hrsday 6 hrsday
किल Kerala No Restrictions No Restrictions
तममल नजड Tamil Nadu 9 hrsday (6 hrs during day time and 3 hrs during night time) 9 hrsday (6 hrs during day time and 3 hrs during night time)
पडचिी Puducherry No Restrictions No Restrictions
परवी कषतर Eastern Region
बबहजि Bihar About 18 hrsday About 18 hrsday
झजिखणड Jharkhand About 20 hrsday About 20 hrsday
ओडडशज Odisha 24 hrsday 24 hrsday
पशशचम बगजल West Bengal About 23 hrsday About 23 hrsday
28
अकटबर 2018 कषि कषतर को षिदयत आपरति का षििरण Power Supply to Agricultural Sector during October2018
राजय कषतर State Regionऔसत वरवदयत आपरतण घनरो म Average Hours of Supply
On segregated feeders
File NoCEA-CH-14-1142018-Coordination Division
SNo Contents Page
1 Growth of Installed Capacity since 6th Plan 29
2 Progress of Transmission Sector since 6th Plan 30
3 All India Yearly Coal consumption for Power Generation (Utilities)
4 All India Annual Per Capita Consumption of Electricity since -2006
5 Average cost of power supply amp Average realisation (Paisakwh)
6 Growth of Rural Electrification amp Pump Sets Energisation
7 Status of Hydro Schemes Cleared by the CEA in Oct-2018
Section G - Growth of Power Sector
31
32
File NoCEA-CH-14-1142018-Coordination Division
(In MW)
Coal Gas Diesel Total
End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472
End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634
End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537
End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596
End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921
End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703
End of 12th Plan 19216288 2532938 83763 21832988 6780 4447842 50018 31960630
Up to Oct-2018 19599250 2493722 837629 22176734 6780 4548742 7201281 34604757
Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-17) = 51529 MW
Electricity Generation (MU) Targets and Achievements for 2016-17
Coal Gas Diesel Nuclear Hydro Res Total
1959925 2493722 837629 678000 454874 72012805 22925174
29
1 Growth of Installed Capacity Since 6th Plan
Plan YearThermal
Nuclear Hydro RES (MNRE) Total
Total Installed Capacity 34604757 MW
Coal Gas Diesel Nuclear Hydro Res
File NoCEA-CH-14-1142018-Coordination Division
Progress of Transmission Sector in the Country up to Oct 2018
1 TRANSMISSION LINES (All fig in CKM)
At the end of
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
6th plan 0 0 0 0 0 0 0 0 0 0 0 0 1831 4198 0 6029 1641 44364 0 46005 3472 48562 0 52034
7th plan 0 0 0 0 0 0 0 0 0 0 0 0 13068 6756 0 19824 4560 55071 0 59631 17628 61827 0 79455
8th plan 0 0 0 0 1634 0 0 1634 0 0 0 0 23001 13141 0 36142 6564 73036 0 79600 31199 86177 0 117376
9th plan 0 0 0 0 3234 1504 0 4738 751 409 0 1160 29345 20033 0 49378 8687 88306 0 96993 42017 110252 0 152269
10th plan 0 0 0 0 4368 1504 0 5872 1775 409 0 2184 48708 24730 0 73438 9444 105185 0 114629 64295 131828 0 196123
11th Plan 0 0 0 0 5948 1504 1980 9432 4839 411 0 5250 71023 30191 5605 106819 10140 125010 830 135980 91950 157116 8415 257481
12th Plan 6124 0 0 6124 5948 1504 1980 9432 25465 1177 4598 31240 92482 48240 17065 157787 11014 151276 978 163268 141033 202197 24621 367851
13th Plan (Up
to Mar2018)6124 0 0 6124 5948 1504 1980 9432 28666 1512 4881 35059 98247 54286 19067 171600 11258 156497 1000 168755 150243 213799 26928 390970
13th Plan (Up
to Sep-18)6124 0 0 6124 5948 1504 1980 9432 30952 1512 5059 37523 99683 56069 20662 176414 11318 160958 1000 173276 154025 220043 28701 402769
27150
75050
47900
118050
90650
30
IR addition in 12th Plan (up to
March 2017)
Total IR (up to Oct-18)
IR at the end of 11th Plan
IR at the end of 12th Plan
Envisaged IR Capacity at the end
of 13th Plan
Grand Total
Note - The figure upto the end of 10th plan in for stringing progress including the lines not commissioned Now only commissioned lines are reckoned Accordingly the figure for 10th plan (end) may read as 187555 after adjusting with (-) 10852 Ckm
Inter-regional Power Transfer Capacity
plusmn 800 kV HVDC plusmn 500 kV HVDC 765 kV 400 kV 220 kV
File NoCEA-CH-14-1142018-Coordination Division
2004-05 27800
2005-06 28100
2006-07 30200
2007-08 33000
2008-09 35500
2009-10 36700
2010-11 38700
2011-12 41756
2012-13 45460
2013-14 48940
2014-15 53040
2015-16 54590
2016-17 57430
2017-18 60800
Year
2005-06
2006-07
2007-08
2008-09
2009-10
2010-11
2011-12
2012-13
2013-14
2014-15
2015-16
2016-17
2017-18
2004-05 254 209 7568
2005-06 260 221 7636
2006-07 276 227 7423
2007-08 293 239 7727
2008-09 340 263 8713
2009-10 355 268 8870
2010-11 398 303 11975
2011-12 455 330 13514
2012-13 501 376 14867
2013-14 518 175
2014-15 520
6719
7171
3 All India yearly Coal Consumption for Power Generation (Utilities)
YEARCoal Consumption
Million Tonnes
4 All India Annual per Capita consumption of Electricity Since 2006
Per Capita Consumption ( kWh)
6314
(GrossGen+ Net Import) Mid-year population
5 Average cost of power supply amp average realization ( paiseKWH )
Yearcost of supply
(paiseunit)
Realization(paiseunit)
Including AgricultureOnly
Agriculture
1149
7335
7786
91441
8188
88363
957
1010
1075
1122
File NoCEA-CH-14-1142018-Coordination Division
Source- PFC Reports on the performance of State Power Utilities 31
File NoCEA-CH-14-1142018-Coordination Division
Sl
NoExecuting Agency
Installed
Capacity (MW)Cost (Rs crore)
Date of
Clearance
32
No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification
since 2004-05
65291374575 296361511th Plan
Cumu upto End of 11th Plan
596556 21212860
557439Cummulative up to end of 12th Plan
46708
18423975
499150
2003-042004-05
5743
9769
Cumu upto End of 10th Plan
010407 to 310308
010410 to 310311557976840909
010411 to 310312
412667
86293726
3207
482864
12632
1576036
4451722594
15455554
2314176
397343611750
2093311060316074
65109527813884
6 Growth Of Rural Electrification amp Pumpsets Energisation
Plan Year
9th Plan2002-03
134092626
4111
Pump Sets Energised Villages Electricfied (Nos)
2001-02
284064367244
1218
27801997-981998-991999-002000-01
297594
010408 to 310309010409 to 310310
10th Plan
2005-062006-07
322968331020
Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as
Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received
from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made
available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified
villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is
independent of the earlier published reports
No Hydro Electric Project has been issued concurrenceAppraisal letter by CEA during October 2018
7 Status of Hydro Schemes Cleared by the CEA in Oct-2018
Name of Scheme
File NoCEA-CH-14-1142018-Coordination Division
SN Contents Page
1 Rate of sale of power for the year 2016-17 33-41
RATE OF SALE OF POWER FOR THE YEAR 2016-17
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) NORTHERN REGION
CENTRAL SECTOR
BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 18000 66900 19800
CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 54000 222400 21600
CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 30000 144400 19600
CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 23100 91700 42600
PARBATI - III HPS NHPC LTD HYDRO-HYDRO 52000 68200 54800
DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 28000 95600 30000
CHUTAK NHPC LTD HYDRO-HYDRO 4400 22000 79800
DULHASTI HPS NHPC LTD HYDRO-HYDRO 39000 228000 56400
SALAL HPS NHPC LTD HYDRO-HYDRO 69000 342300 11000
TANAKPUR HPS NHPC LTD HYDRO-HYDRO 9420 43000 29600
URI HPS -I NHPC LTD HYDRO-HYDRO 48000 280300 16000
URI HPS - II NHPC LTD HYDRO-HYDRO 24000 147300 48600
NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 4500 24600 88200
SEWA - II NHPC LTD HYDRO-HYDRO 12000 47100 43400
ANTA CCPP NTPC LTD THERMAL-GASN 41930 67539 32400
AURAIYA CCPP NTPC LTD THERMAL-GASN 66336 53501 39100
BADARPUR TPS NTPC LTD THERMAL-COAL 70500 159153 44800
DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 84000 296170 42300
DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 98000 526686 46300
DADRI CCPP NTPC LTD THERMAL-GASHSD 82978 227469 33000
FARIDABAD CCPP NTPC LTD THERMAL-GASN 43159 115577 30800
RIHAND STPS I NTPC LTD THERMAL-COAL 100000 596766 24500
RIHAND STPS II NTPC LTD THERMAL-COAL 100000 737069 24600
RIHAND STPS III NTPC LTD THERMAL-COAL 100000 706546 30600
SINGRAULI STPS NTPC LTD THERMAL-COAL 200000 1394068 20400
TANDA TPS NTPC LTD THERMAL-COAL 44000 295438 40800
UNCHAHAR TPS I NTPC LTD THERMAL-COAL 42000 256454 39800
UNCHAHAR TPS II NTPC LTD THERMAL-COAL 42000 273577 38900
UNCHAHAR TPS III NTPC LTD THERMAL-COAL 21000 142780 43000
KOLDAM NTPC LTD HYDRO-HYDRO 80000 363260 43600
NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 303575 25841
RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 108000 668677 35374
NJHPS SJVNL HYDRO-HYDRO 150000 699496 23820
RAMPUR HPS SJVNL HYDRO-HYDRO 41202 195982 32260
TEHRI HPP THDC HYDRO-HYDRO 100000 272543 51800
KOTESHWAR HEP THDC HYDRO-HYDRO 40000 106244 53400
IGSTPS JHAJJAR ARAVALI P CPL THERMAL-COAL 150000 510429 49490
NEYVELI BARSINGSAR NEYVELI LIG CORP LTD THERMAL-LIG 25000 127520 38040
STATE SECTOR
PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 21000 14222 48200
PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 21000 19205 48400
PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 25000 102257 42600
PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 25000 62107 41800
DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 60000 312213 41000
RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 120000 35767442200
WYC HYDEL STATION HPGCL HYDRO-HYDRO 6240 20365 24900
GIRI POWER HOUSE HPSEB HYDRO-HYDRO 6000 13958 7600
ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 1695 5467 11900
BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 12000 18528 6700
GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 2250 7462 22500
BASSI POWER HOUSE HPSEB HYDRO-HYDRO 6600 29649 7500
BINWA POWER HOUSE HPSEB HYDRO-HYDRO 600 2749 19300
ANNEXURE-I
RATE OF SALE OF POWER FOR THE YEAR 2016-2017
Page 33
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) GAJ POWER HOUSE HPSEB HYDRO-HYDRO 1050 2914 26700
BANER POWER HOUSE HPSEB HYDRO-HYDRO 1200 2864 16200
HOLI POWER HOUSE HPSEB HYDRO-HYDRO 300 616 22500
THIROT POWER HOUSE HPSEB HYDRO-HYDRO 450 1126 22500
KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 1200 3064 22500
LARJI POWER HOUSE HPSEB HYDRO-HYDRO 12600 53677 23700
NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 250 750 31000
CHABA POWER HOUSE HPSEB HYDRO-HYDRO 175 465 23300
RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 150 101 13400
SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 200 000 22500
KILLAR HPSEB HYDRO-HYDRO 030 050 22500
BHABA AUGUMENP H HPSEB HYDRO-HYDRO 450 1276 22500
BS CHAMBA HPSEB HYDRO-HYDRO 045 099 19500
GUMMA HPSEB HYDRO-HYDRO 300 423 22500
GAS TURBINE POWER STATION IPGCL THERMAL-GAS 27000 67233 39300
PPS-I PPCL THERMAL-GAS 33000 175905 38300
PPS-III PPCL THERMAL-GAS 137120 196879 36100
LOWER JHELUM JampKPDD HYDRO-HYDRO 10500 60214 5100
UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 2260 10514 6300
UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 10500 44202 8500
GANDHARBAL JampKPDD HYDRO-HYDRO 1500 8925 4700
KARNAH MPH JampKPDD HYDRO-HYDRO 200 1122 31000
CHENANI I JampKPDD HYDRO-HYDRO 2330 10892 6600
CHENANI II JampKPDD HYDRO-HYDRO 200 1188 9300
CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 750 3634 14200
IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 375 2108 18500
IGO MERCHELLONG JampKPDD HYDRO-HYDRO 300 1572 29700
PAHALGAM MHP JampKPDD HYDRO-HYDRO 450 1713 32900
MARPACHOO JampKPDD HYDRO-HYDRO 075 375 29800
HAFTAL JampKPDD HYDRO-HYDRO 100 483 28700
SANJAK JampKPDD HYDRO-HYDRO 126 441 36000
SEWA-III JampKPDD HYDRO-HYDRO 900 3273 20200
BHADERWAH JampKPDD HYDRO-HYDRO 150 935 8900
BAZGO JampKPDD HYDRO-HYDRO 030 108 33300
SUMOOR JampKPDD HYDRO-HYDRO 010 045 35400
HUNDER JampKPDD HYDRO-HYDRO 040 176 26200
STAKNA JampKPDD HYDRO-HYDRO 400 1933 4100
KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 124000 662879 31360
SURATGARH TPS RRVUNL THERMAL-COAL 150000 402328 41730
CHHABRA TPS 1amp 2 RRVUNL THERMAL-COAL 50000 305946 36700
CHHABRA TPS 3 RRVUNL THERMAL-COAL 25000 151536 36700
CHHABRA TPS 4 RRVUNL THERMAL-COAL 25000 155896 36700
RAMGARH GT POWER PROJECT RRVUNL THERMAL-COAL 22050 43177 41800
RAMGARH GAS T P PROJECT 3 RRVUNL THERMAL-GAS 5000 93615 41800
DHOLPUR C C POWER PROJECT RRVUNL THERMAL-R-LNG 33000 9486 46110
MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 14000 20855 34192
MINI MICRO HYDEL (MMH) P S RRVUNL HYDRO-HYDRO 2385 851 37800
KALISINDH TPP 1 RRVUNL THERMAL-COAL 60000 341543 45000
KALISINDH TPP 2 RRVUNL THERMAL-COAL 60000 211588 45000
KHARA HEP UPJVNL HYDRO-HYDRO 7200 26654 7200
MATATILLA HEP UPJVNL HYDRO-HYDRO 3060 12219 6500
OBRA HEP UPJVNL HYDRO-HYDRO 9900 21517 6300
RIHAND UPJVNL HYDRO-HYDRO 30000 57369 5500
ANPARA A TPS UPRVUNL THERMAL-COAL 63000 317536 27000
ANPARA B TPS UPRVUNL THERMAL-COAL 100000 705605 22700
ANPARA D UPRVUNL THERMAL-COAL 100000 300158 39800
HARDUAGANJ TPS UPRVUNL THERMAL-COAL 16500 45817 49200
HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 50000 304389 46600
OBRA A TPS UPRVUNL THERMAL-COAL 28800 13158 34000
OBRA B TPS UPRVUNL THERMAL-COAL 100000 328124 21900
Page 34
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) PANKI TPS UPRVUNL THERMAL-COAL 21000 66488 50300
PARICHHA TPS UPRVUNL THERMAL-COAL 22000 38762 49400
PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 42000 231931 45600
PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 50000 276722 50400
CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 24000 70845 8290
CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 14400 75366 8390
DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 3375 9595 12080
DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 5100 18701 10520
KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4140 17359 12330
KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 12000 33001 9420
KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 3000 11953 8320
TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 9000 33983 12460
MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 30400 124510 16110
RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 19800 17897 10550
MPUR UTTARAKHAND JVNL HYDRO-HYDRO 930 5121 19200
PATHRI UTTARAKHAND JVNL HYDRO-HYDRO 2040 11636 14200
GALOGI UTTARAKHAND JVNL HYDRO-HYDRO 300 648 12500
PRIVATE SECTOR
MGTPP CLP INDIA PVT LTD THERMAL-COAL 132000 268902 41940
SHRINAGAR HEP ALAKNANDA HPCL HYDRO-HYDRO 33000 127414 48800
GAMA INFRAPROP CCPP GAMA INFRAPROP PVT THERMAL-GAS 22500 52686 47000
PPGCL (BARA) JP POWER VENTURES LTD THERMAL-COAL 198000 448200 38500
MALANA HEP MALANA PCL HYDRO-HYDRO 8600 26354 29792
MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 10000 30369 32580
ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 19200 56347 36079
KASHANG HEP H P PCL HYDRO-HYDRO 19500 5034 29200
BASPA-II HEP HBPCL HYDRO-HYDRO 30000 132769 13600
KARCHAM WANGTOO HEP HBPCL HYDRO-HYDRO 100000 434386 36600
RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 108000 582600 43700
RITHALA COMBI CY POWER PLANT TATA POWER DDL THERMAL-GAS 9480 000 11900
RAJPURA TPS NABHA POWER LTD THERMAL-GAS 140000 901484 39000
TALWANDI SABO POWER LTD TALWANDI SABO POWER LTD THERMAL-COAL 198000 636040 49548
ROJA THERMAL POWER STATION ROJA POWER SCL THERMAL-COAL 120000 727200 43400
KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 34400 63400
BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 36000 62600
MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 38200 60800
UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 37900 61500
KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 42300 58800
LALITPUR PGCL BAJAJ ENERGY PVT LTD THERMAL-COAL 198000 359400 47300
PRAYAGRAJ PGCL PRAYAGRAJ PGCL THERMAL-COAL 132000 448200 38595
KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 132000 783182 33438
WESTERN REGION
CENTRAL SECTOR
INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 100000 325333 23892
OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 52000 141663 34001
GANDHAR CCPP NTPC LTD THERMAL-GAS 65739 221924 28700
KAWAS CCPP NTPC LTD THERMAL-GASN 65620 167929 27000
KORBA I amp II NTPC LTD THERMAL-COAL 210000 1499171 20500
KORBA III NTPC LTD THERMAL-COAL 50000 358746 26600
SIPAT STPS I NTPC LTD THERMAL-COAL 198000 1479902 26800
SIPAT STPS II NTPC LTD THERMAL-COAL 100000 766549 26500
VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 126000 693142 25800
VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 100000 608781 23800
VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 100000 673475 27600
VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 100000 655924 32900
VINDHYACHAL STPS V NTPC LTD THERMAL-COAL 50000 328265 31700
MOUDA I NTPC LTD THERMAL-COAL 100000 343130 44500
MOUDA Ii NTPC LTD THERMAL-COAL 66000 40637 39900
RATNAGIRI GAS amp POWER PVT LTD RGPPL THERMAL-GAS 196708 442485 47000
KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 000 24729
TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 32000 201227 10740
Page 35
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 365122 19069
TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 787444 29324
STATE SECTOR
GSEG-HAZIRA15610 MW GUJARAT S ENEGEN LTD THERMAL-GAS 15610 1805 28200
GSEG-HAZIRA35143 MW GUJARAT S ENEGEN LTD THERMAL-GAS 35130 22276 51300
GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 21978 51800
AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 13929 26100
KORBA TPS EAST CSPGCL THERMAL-COAL 44000 198673 33880
DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 365808 27570
KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 316500 30420
HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 532878 19410
CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 515 58300
MTTPS CHAMPA U-I CSPGCL THERMAL-COAL 50000 220376 39000
MTTPS CHAMPA U-II CSPGCL THERMAL-COAL 50000 23709 10000
SHP GANGREL CSPGCL HYDRO-HYDRO 1000 2350 36790
BANGO HEP CSPGCL HYDRO-HYDRO 12000 14662 8900
MHP KORBA WEST CSPGCL HYDRO-HYDRO 170 859 38190
SIKASAR HEP CSPGCL HYDRO-HYDRO 700 418 26870
DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8843 74500
DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 19446 51500
GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 66388 71600
GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127488 41300
KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 96072 43900
KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 29841 56400
SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 184966 58800
UKAI 1-5 GSECL THERMAL-COAL 85000 204891 46900
UKAI TPS 6 GSECL THERMAL-COAL 50000 284448 48200
WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 271999 58300
WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 82808 44100
KADANA HPS GSECL HYDRO-HYDRO 24200 34433 16800
UKAI HPS GSECL HYDRO-HYDRO 30500 40585 6100
TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 123000 11500
BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 8900 10900
BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 7200 27500
JHINNA HPS MPPGCL HYDRO-HYDRO 2000 9700 18500
RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 44300 3400
GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 17300 4600
SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 4100 16900
MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 14600 27000
PENCH HPS MPPGCL HYDRO-HYDRO 16000 23700 8100
RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 3000 16900
AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 134400 35100
SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 283800 38700
SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 344600 34300
SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 111600 61600
SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 211800 58000
SSTPS PH-I MPPGCL THERMAL-COAL 120000 233100 84300
BHUSAWAL TPS MSPGCL THERMAL-COAL 142000 566258 51100
CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1365682 33700
KHAPERKHEDA MSPGCL THERMAL-COAL 134000 706207 39100
KORADI TPS MSPGCL THERMAL-COAL 62000 443206 42000
NASIK TPS MSPGCL THERMAL-COAL 63000 297275 47000
PARLI TPS MSPGCL THERMAL-COAL 113000 175934 71600
PARAS MSPGCL THERMAL-COAL 50000 267931 38700
URAN CCPP MSPGCL THERMAL-GAS 67200 320330 30600
KOYANA MSPGCL HYDRO-HYDRO 195600 328155 13100
SMALL HYDRO POWER PLANTS MSPGCL HYDRO-HYDRO 45400 93062 30500
BHIRA MSPGCL HYDRO-HYDRO 8000 10046 8400
TILLARI MSPGCL HYDRO-HYDRO 8900 10584 3100
SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 233298 20500
SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 87633 20500
PRIVATE SECTOR
Page 36
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 81282 46750
JNSTPP(JAYPEE NIGRIE) JP POWER VENTURES LTD THERMAL-COAL 132000 726695 29310
MB POWER MB POWER THERMAL-COAL 120000 345632 38310
ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 754922 28671
ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 780761 23495
ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 198000 1263784 32090
ADANI POWER MAHARA ADANI POWER LTD THERMAL-COAL 330000 1666191 34124
AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 170065 36827
SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 252035 45129
ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 458551 36000
ESSAR POWER MP LTD ESSAR POWER MP LTD THERMAL-COAL 60000 243040 28600
VEDANTA LTD (P P -I) VEDANTA LTD THERMAL-GAS 3000 15044 24000
VEDANTA LTD (P P -II) VEDANTA LTD THERMAL-GAS 3000 21293 24000
PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 8234600 24000
165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 5850 64390
145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 68717 40349
SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 132655 28776
SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 144686 38567
MUNDRA UMPPCOASTAL GUJARAT POWER
LTD THERMAL-IMP COAL 400000 2530300
23900
LANCO AMARKANTAK TPP PATHADIH
U-ILANCO AMARKAN POWER LTD THERMAL-COAL 30000 195500
29200
LANCO AMARKANTAK TPP PATHADIH
U-IILANCO AMARKAN POWER LTD THERMAL-COAL 30000 206900
27600
BARADARHA TPS D B POWER LTD THERMAL-COAL 120000 677373 29200
JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 405000 28900
JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 453000 40500
DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 339437 40700
TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 293400 44000
TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 137200 37000
TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 174900 44000
BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 92900 14100
BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23700 34300
KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 27600 48300
CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2530300 23900
BHANDARDRA HEP -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 2475 54900
SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 161400 26500
SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 445000 39000
SOTHERN REGION
CENTRAL SECTOR
NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 325699 54820
NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 305532 39880
NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 998805 38510
NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 113016 54070
NEYVELI TAMILNADU POWER LTD JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 625274 42200
VALLUR TPS NTPC TECL THERMAL-COAL 150000 856438 42350
R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 1493 84300
RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1502919 29400
RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 341291 31800
SIMHADRI I NTPC LTD THERMAL-COAL 100000 688382 36800
SIMHADRI II NTPC LTD THERMAL-COAL 100000 663657 43400
KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 593110 31324
MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 291625 21764
KKNPP-1 amp 2 NPCIL NUCLEAR-NUCLEAR 200000 572609 40948
MINICOY LAKSHADEEP THERMAL-DIESEL 340 770 29600
KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1097 29600
AMINI LAKSHADEEP THERMAL-DIESEL 265 509 29600
ANDROTT LAKSHADEEP THERMAL-DIESEL 219 524 29600
KALPENI LAKSHADEEP THERMAL-DIESEL 175 356 29600
AGATTI LAKSHADEEP THERMAL-DIESEL 195 658 29600
KADMAT LAKSHADEEP THERMAL-DIESEL 190 414 29600
KILTAN LAKSHADEEP THERMAL-DIESEL 150 269 29600
CHETLET LAKSHADEEP THERMAL-DIESEL 100 139 29600
BITRA LAKSHADEEP THERMAL-DIESEL 043 024 29600
BANGARAM LAKSHADEEP THERMAL-DIESEL 018 009 29600
Page 37
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) STATE SECTOR
Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 721811 46500
Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 50000 336142 46500
RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 237358 46500
RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 239926 46500
RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 124500 46500
SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 62109 46500
UPPER SILERU APGENCO HYDRO-HYDRO 24000 33000 46500
LOWER SILERU APGENCO HYDRO-HYDRO 46000 81066 46500
DONKARAI APGENCO HYDRO-HYDRO 2500 6007 46500
PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 1262 46500
CHETTIPETA APGENCO HYDRO-HYDRO 100 214 46500
MUCHKUND APGENCO HYDRO-HYDRO 12000 37571 46500
NAGARJUNASAGAR RCPH APGENCO HYDRO-HYDRO 9000 606 46500
TUNGABHADRA HES amp HAMPI(AP
Share)
APGENCO HYDRO-HYDRO 7200 6100 46500
KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 352232 42600
KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 288131 32500
KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 319272 46500
RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 40073 44300
KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 308317 46000
KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 308963 51300
SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 61004 76600
NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 17960 75300
PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 20873 58300
POCHAMPAD-I TSPGENCO HYDRO-HYDRO 2700 5455 29800
POCHAMPAD-II TSPGENCO HYDRO-HYDRO 900 1932 40700
NIZAMSAGAR TSPGENCO HYDRO-HYDRO 1000 1126 53400
RAICHUR TPS 1 to 7 KPCL THERMAL-COAL 147000 890866 43800
RAICHUR TPS 8 KPCL THERMAL-COAL 25000 159523 48200
BELLARI TPS 1 KPCL THERMAL-COAL 50000 318679 51100
BELLARI TPS 2 KPCL THERMAL-COAL 50000 232347 55600
BELLARI TPS 3 KPCL THERMAL-COAL 70000 47565 34400
BHADRA PH KPCL HYDRO-HYDRO 3920 2369 45900
GERUSUPPA PH KPCL HYDRO-HYDRO 24000 26990 22000
GHAT PRABHA HEP KPCL HYDRO-HYDRO 3200 4777 25300
KADRA HPS KPCL HYDRO-HYDRO 15000 16889 26800
NAGJHARI KPCL HYDRO-HYDRO 90000 155159 9800
KODASALLI DPH KPCL HYDRO-HYDRO 12000 14854 19200
MUNIRA+MGH+SPH+SPH KPCL HYDRO-HYDRO 22640 48211 7900
SHARAVATHY HPS KPCL HYDRO-HYDRO 108550 276215 5400
ALMATTI DPH KPCL HYDRO-HYDRO 29000 39611 24600
VARAHI UGPH KPCL HYDRO-HYDRO 46000 71368 15600
IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 17196 15300
IDUKKI HPS KSEB HYDRO-HYDRO 78000 137905 15300
KAKKAD HPS KSEB HYDRO-HYDRO 5000 13063 15300
KALLADA HPS KSEB HYDRO-HYDRO 1500 4436 15300
KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 46544 15300
KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 635 15300
LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 30822 15300
MALANKARA HPS KSEB HYDRO-HYDRO 1050 2474 15300
MATTUPETTY KSEB HYDRO-HYDRO 200 230 15300
MALAMPUZHA KSEB HYDRO-HYDRO 250 063 15300
CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 864 15300
URUMI ST I amp II KSEB HYDRO-HYDRO 615 903 15300
LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 248 15300
NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7765 19625 15300
PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 16601 15300
PANNIAR HPS KSEB HYDRO-HYDRO 3240 6217 15300
PORINGALKUTHU KSEB HYDRO-HYDRO 3600 10052 15300
PORINGALKUTHU LBE KSEB HYDRO-HYDRO 1600 9438 15300
PEPPARA KSEB HYDRO-HYDRO 300 395 15300
POOZHITHODE KSEB HYDRO-HYDRO 480 1045 15300
Page 38
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) PEECHI KSEB HYDRO-HYDRO 125 040 15300
RANI-PERUNADU KSEB HYDRO-HYDRO 400 585 15300
SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 79783 15300
SENGULAM HPS KSEB HYDRO-HYDRO 5120 11558 15300
SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 16711 15300
VILANGAD KSEB HYDRO-HYDRO 750 1578 15300
BARAPOLE KSEB HYDRO-HYDRO 1500 1932 15300
VELLATHOOVAL KSEB HYDRO-HYDRO 360 305 15300
CHIM0NY KSEB HYDRO-HYDRO 250 156 15300
ADYANPARA KSEB HYDRO-HYDRO 350 501 15300
BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 554 15300
KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 3801 15300
KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 23132 32800
ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 14416 62280
METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 523970 62280
METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 321270 62280
NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 336575 62280
NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 591240 62280
TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 508966 62280
KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 30897 62280
VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 18720 90699 62280
KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 33593 62280
BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 1047 62280
PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 1250 62280
PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 330 62280
MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 4897 62280
MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 032 62280
KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15681 62280
KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 40608 62280
KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 21342 62280
KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 4717 62280
KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4322 62280
KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2399 62280
METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 4416 62280
METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 8035 62280
BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2187 62280
BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2359 62280
BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2511 62280
BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 1949 62280
BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 1819 62280
POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 172 62280
SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 241 62280
MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 026 62280
THIRUMOORTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 136 62280
PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 9309 62280
VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 353 62280
SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 4192 62280
PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 6571 62280
SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 1186 62280
SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6319 62280
ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 6122 62280
KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 28674 62280
SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 18381 62280
SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 4258 62280
KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 12680 62280
KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4201 62280
ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 000 62280
PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 19175 62280
AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 078 62280
BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 504 62280
BHAVANI KATTALAI (BKB)(IIIampIII BB I amp II)TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 5847 62280
PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 000 62280
Page 39
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) SRI DAMODARAM STPS APPDCL THERMAL-COAL 160000 808108 36300
PRIVATE SECTOR
KARUPPUR TANJORE LANCO TANJORE PCL THERMAL-GAS 12000 48096 28770
SIMHAPURI ENERGY LTD SIMHAPURI ENERGY LTD THERMAL-COAL 60000 143900 39100
JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 7111 45500
SBU 1 JSW ENERGY LTD
VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 26000 159100
43300
SBU 2 JSW ENERGY LTD
VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 60000 247900
42800
LANCO KPLLANCO KONDAPALLI POWER
LTDTHERMAL-GAS 36814 85060
25776
LANCO KPL STG -IILANCO KONDAPALLI POWER
LTDTHERMAL-GAS 36600 12979
46330
LANCO KPL STG -IIIALANCO KONDAPALLI POWER
LTDTHERMAL-GAS 37100 85710
46330
LANCO KPL STG -III BLANCO KONDAPALLI POWER
LTDTHERMAL-GAS 37100 43639
46330
HINDUJA NATIONAL PCL HINDUJA NATIONAL PCL THERMAL-COAL 104000 303000 38200
MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 121164 49940
UDUPI POWER COR LTD ADANI POWER LTD THERMAL-COAL 120000 754613 42500
SPECTRUM POWER GENERATION
LTD SPECTRUM PG LTD THERMAL-GASN 20525 9256812
34952
TAQA NEYVELI POWER COM PVT
LTD TAQA NEYVELI THERMAL-LIG 25000 5840
34500
ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 251000 51000
ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 207860 36800
GMR VEMAGIRI POWER GENERATION
LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 30117
46450
EASTERN REGION
CENTRAL SECTOR
MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 64675 53113
MTPS STAGE - II KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 39000 1432 69138
BOKARO `B` TPS DVC THERMAL-COAL 63000 145670 31539
MEJIA TPS U 1-3 DVC THERMAL-COAL 63000 348298 31552
MEJIA TPS U 4 DVC THERMAL-COAL 21000 116099 34997
MEJIA TPS U 5-6 DVC THERMAL-COAL 50000 276427 35976
MEJIA TPS U 7-8 DVC THERMAL-COAL 100000 552854 36991
DURGAPUR STEEL TPS DVC THERMAL-COAL 100000 665550 39323
DURGAPUR TPS DVC THERMAL-COAL 21000 59270 35416
RAGHUNATHPUR TPS DVC THERMAL-COAL 120000 201650 35326
MAITHON HYDEL STA DVC HYDRO-HYDRO 6320 12200 17984
CHANDRAPURA TPSU1-3 DVC THERMAL-COAL 42000 257610 35095
CHANDRAPURA TPSU7-8 DVC THERMAL-COAL 50000 306673 34987
KODERMA TPS DVC THERMAL-COAL 100000 380180 38131
PANCHET HPS DVC HYDRO-HYDRO 8000 13360 17984
TILLAYA HPS DVC HYDRO-HYDRO 400 1410 17984
RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34700 35400
TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 277300 23200
TLDP -III NHPC LTD HYDRO-HYDRO 13200 55400 62000
TLDP -IV NHPC LTD HYDRO-HYDRO 16000 60300 25600
FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 957219 33700
FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 308943 41000
BONGAINGAON TPS NTPC LTD THERMAL-COAL 25000 153663 58600
KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 542277 34200
KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 942591 34200
BARH-II NTPC LTD THERMAL-COAL 132000 728021 44500
TALCHER TPS NTPC LTD THERMAL-COAL 46000 335521 30100
TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 702319 25600
TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1436521 24700
STATE SECTOR
BTPS(RampM) BIHAR STATE PGCL THERMAL-COAL 22000 12142 39700
BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 98331 10602
HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 50593 9482
CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 19689 2605
RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 53192 6033
UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 147208 14637
Page 40
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 60353 4519
IB TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 288567 25000
J P H GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 210 038 61100
MEYONG CHU GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 400 1086 61100
TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 122667 38200
DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 214339 43321
KOLAGHAT THERMAL POWER
STATION
WEST BENGAL PDCL THERMAL-COAL 126000 538269 31603
BAKRESHWAR THERMAL POWER
PLANT
WEST BENGAL PDCL THERMAL-COAL 105000 634876 32154
BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 45000 166855 33299
SANTHALDIH THERMAL POWER
STATION
WEST BENGAL PDCL THERMAL-COAL 50000 336442 34932
SAGARDIGHI THERMAL POWER
PROJECT
WEST BENGAL PDCL THERMAL-COAL 160000 423121 34705
JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 20344 68900
RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 24559 68900
TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 4623 68900
PURULIA PUMPED STORAGE
PROJECT
WEST BENGAL SEDCL HYDRO-HYDRO 90000 108816 68900
MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2768 68900
PRIVATE SECTOR
CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 49474 20230
CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 555500 70200
HALDIA ENERGY HALDIA ENERGY LTD THERMAL-COAL 60000 371000 50400
DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3688 63400
KAMALANGA TPS GMR KAMALANGA ENERGY LTD THERMAL-COAL 105000547670
33300
ADHUNIK POWER U-1 ADHUNIK POWER THERMAL-COAL 27000 158 44060
ADHUNIK POWER U-2 ADHUNIK POWER THERMAL-COAL 27000 168 44250
VL-JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 332800 23622
JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 43000 45250
JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 71700 37030
JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 70700 35920
JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 71100 38870
JOJOBERA UNIT 5 TATA POWER COM LTD THERMAL-COAL 12000 79300 44560
JOJOBERA UNIT 6 TATA POWER COM LTD THERMAL-WHR 12000 83700 12840
IEL KALINGANAGAR U-I TATA POWER COM LTD THERMAL-WG 6750 33400 22500
IEL KALINGANAGAR U-II TATA POWER COM LTD THERMAL-WG 6750 34800 22500
MAITHON UNIT 1 amp 2 TATA POWER COM LTD THERMAL-COAL 105000 678000 36100
HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 27500 24340
HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 28400 24340
HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 15800 24310
NORTH EASTERN REGION
CENTRAL SECTOR
LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 74100 36600
AGARTALA GT NEEPCO THERMAL-GAS 13500 88611 27210
ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 153111 32310
DOYANG HEP NEEPCO HYDRO-HYDRO 7500 25598 49801
KOPILI HEP NEEPCO HYDRO-HYDRO 20000 98186 11491
KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 19582 20237
KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 10310 17968
RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 124093 22945
TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 10100 17344 39000
STATE SECTOR
HYDRO POWER (122 Stns) ITANAGAR GOVT OF ARUNACHAL
PRADESHHYDRO-HYDRO 6971 6217270
24600
KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39514 17337
LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 82327 36810
NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 33318 48290
MYNTRIANG SHEP ST II ASSAM POWER GENCO HYDRO-HYDRO 300 567 35776
LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 9130 49200
LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 012 49200
DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 022 49200
TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 000 49200
UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 4990 16000
UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 6476 37000
UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 16494 14600
UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 3600 9556 15000
SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 758 8000
MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44070 44800
KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 154 41400
TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 091 41400
MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 411 41400
MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 394 41400
KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 760 41400
SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 3264 41400
LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 044 41400
BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 18953 28000
ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 43585 28200
GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 4080 11100
Note
LIG Lignite N Naptha WHR Waste Heat Recovery
Page 41
File NoCEA-CH-14-1142018-Coordination Division
(As on 31102018)
Coal Gas Diesel Total
State 71000 000 000 71000 000 000 7070 78070
Private 28100 000 000 28100 000 000 25545 53645
Central 291433 000 000 291433 000 11000 000 302432
Sub-Total 390533 000 000 390533 000 11000 32615 434147
State 42000 000 000 42000 000 13000 405 55405
Private 73000 000 000 73000 000 000 3207 76207
Central 39374 000 000 39374 000 6100 000 45474
Sub-Total 154374 000 000 154374 000 19100 3612 177086
State 540000 10000 000 550000 000 98600 9195 657795
Private 242500 000 000 242500 000 000 34452 276952
Central 76077 000 000 76077 000 41000 000 117077
Sub-Total 858577 10000 000 868577 000 139600 43647 1051824
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 000 000
Central 698504 000 000 698504 000 18620 000 717124
Sub-Total 698504 000 000 698504 000 18620 000 717124
State 42000 000 000 42000 000 206192 630 248822
Private 293900 000 000 293900 000 000 21648 315548
Central 163390 000 000 163390 000 8900 1000 173290
Sub-Total 499290 000 000 499290 000 215092 23278 737660
State 000 000 000 000 000 36000 5211 41211
Private 000 000 000 000 000 39900 001 39901
Central 8703 000 000 8703 000 6400 000 15103
Sub-Total 8703 000 000 8703 000 82300 5212 96215
110183 000 000 110183 000 8501 000 118684
State 695000 10000 000 705000 000 353792 22511 1081303
Private 637500 000 000 637500 000 39900 84853 762253
Central 1387664 000 000 1387664 000 100520 1000 1489184
Grand Total 2720164 10000 000 2730164 000 494212 108364 3332740
(As on 31102018)
Coal Gas Diesel Total
State 000 32821 000 32821 000 10000 3001 45822
Private 000 2450 000 2450 000 000 1680 4130
Central 27902 43556 000 71458 000 36851 000 108309
Sub-Total 27902 78827 000 106729 000 46851 4681 158261
State 000 000 000 000 000 000 10710 10710
Private 000 000 000 000 000 000 539 539
Central 2470 4682 000 7152 000 11800 000 18952
Sub-Total 2470 4682 000 7152 000 11800 11249 30201
State 000 000 000 000 000 32200 3103 35303
Private 000 000 000 000 000 000 006 006
Central 3040 10969 000 14009 000 7446 000 21455
Sub-Total 3040 10969 000 14009 000 39646 3109 56764
State 000 16950 000 16950 000 000 1601 18551
Private 000 000 000 000 000 000 009 009
Central 3740 43695 000 47435 000 7077 500 55012
Sub-Total 3740 60645 000 64385 000 7077 2110 73572
State 000 000 3600 3600 000 000 545 4145
Private 000 000 000 000 000 000 217 217
Central 3140 7157 000 10297 000 9677 000 19974
Sub-Total 3140 7157 3600 13897 000 9677 762 24336
State 000 000 000 000 000 000 3067 3067
Private 000 000 000 000 000 000 100 100
Central 2140 4893 000 7033 000 5860 000 12893
Sub-Total 2140 4893 000 7033 000 5860 3167 16060
State 000 000 000 000 000 000 3647 3647
Private 000 000 000 000 000 000 020 020
Central 2070 4046 000 6116 000 9913 000 16029
Sub-Total 2070 4046 000 6116 000 9913 3667 19696
7500 6362 000 13862 000 14376 000 28238
State 000 49771 3600 53371 000 42200 25674 121245
Private 000 2450 000 2450 000 000 2571 5021
Central 52002 125360 000 177362 000 103000 500 280862
Grand Total 52002 177581 3600 233183 000 145200 28745 407128
Central - Unallocated
Total (Eastern
Region)
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
NORTH-EASTERN REGION
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
State Ownership Sector
Modewise breakup
Grand TotalThermalNuclear
Bihar
Jharkhand
West Bengal
DVC
Odisha
Sikkim
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
EASTERN REGION
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
Ownership Sector
Modewise breakup
Grand TotalThermalNuclear
Hydro
(Renewable)
RES
(MNRE)
Manipur
Nagaland
State
Mizoram
Central - Unallocated
Total (North-
Eastern Region)
Hydro
(Renewable)
RES
(MNRE)
Assam
Arunachal Pradesh
Meghalaya
Tripura
File NoCEA-CH-14-1142018-Coordination Division
(As on 31102018)
Coal Gas Diesel Total
State 000 000 4005 4005 000 000 525 4530
Private 000 000 000 000 000 000 146 146
Central 000 000 000 000 000 000 510 510
Sub-Total 000 000 4005 4005 000 000 1181 5186
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 075 075
Central 000 000 000 000 000 000 000 000
Sub-Total 000 000 000 000 000 000 075 075
State 000 000 4005 4005 000 000 525 4530
Private 000 000 000 000 000 000 221 221
Central 000 000 000 000 000 000 510 510
Grand Total 000 000 4005 4005 000 000 1256 5261
19
Andaman amp
Nicobar
lakshadweep
Total (Islands)
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
State Ownership Sector
Modewise breakup
Grand TotalThermalNuclear
Hydro
(Renewable)
RES
(MNRE)
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
ISLANDS
File NoCEA-CH-14-1142018-Coordination Division
SrNo Contents Page
1 Executive summary of Target and Achievement of Transmission Lines during 2018-19
20(1)
2 List of Transmission Lines CommissionedReady for commissioning during Oct-2018 20(2)
Section C - Transmission Lines
File NoCEA-CH-14-1142018-Coordination Division
Executive summary of Target and Achievement of Transmission Lines during 2018-19 As on Oct-18
(All figures in circuit kms)
Centr
al S
ecto
r
Sta
te S
ecto
r
JV
Private
Secto
r
To
tal
Centr
al S
ecto
r
Sta
te S
ecto
r
JV
Private
Secto
r
To
tal
Centr
al S
ecto
r
Sta
te S
ecto
r
JV
Private
Secto
r
To
tal
Centr
al S
ecto
r
Sta
te S
ecto
r
JV
Private
Secto
r
To
tal
Centr
al S
ecto
r
Sta
te S
ecto
r
JV
Private
Secto
r
To
tal
Cen
tral S
ecto
r
Sta
te S
ecto
r
JV
Pri
vate
Secto
r
Gra
nd
To
tal
0 0 0 0 0 0 0 0 4692 766 827 6285 3045 5906 980 9931 553 5878 0 6431 8290 12550 1807 22647
Oct18 Programme 0 0 0 0 0 0 0 0 300 0 0 300 662 90 562 1314 0 723 0 723 962 813 562 2337
Achievement 0 0 0 0 0 0 0 0 729 0 0 729 471 266 0 737 0 401 0 401 1200 667 0 1867
Upto Oct-18 Programme 0 0 0 0 0 0 0 0 3004 416 0 3420 1350 3109 562 5021 481 4346 0 4827 4835 7871 562 13268
Achievement 0 0 0 0 0 0 0 0 2286 0 178 2464 1436 1783 1595 4814 60 4461 0 4521 3782 6244 1773 11799
20(1)
220 kV Grand Total 800 kV 500 kV
Programme 2018-19
Programme
Achievement
HVDC765 kV 400 kV
File NoCEA-CH-14-1142018-Coordination Division
SlNo Line
Length
(cKM)
1 2 3 4 5 6
1 765 Jharsuguda - Dharamjaygarh line DC PGCIL 296
2 765LILO of Kurnool - Thirvualam line at
CuddapahDC PGCIL 190
3 765 Salem PS - Madhugiri PS line SC PGCIL 243
4 400 Cuddapah - Hindupur line (Q) DC PGCIL 338
5 400LILO of Both Ckt of Bamnauli - Samaypur at
TughlakabadMC PGCIL 114
6 400LILO-Out of Cuddapah - Hindupur line (Q)
(Both Ckts) at NP Kunta ssDC PGCIL 19
1200
7 400LILO of Sterlite - Meramundali at Lapanga
4oo kV ssDC OPTCL 14
8 400 Sterlite - Lapanga line DC OPTCL 37
9 400 TMDC Podili - Sattapenalli line DC APTRANSCO 215
10 230Neyveli 230110 kV ss - Eachangadu
230kV FeederSC TANTRANSCO 1
11 230 NNTPS - Neyveli 230110kV ss DC TANTRANSCO 2
12 220 Ajmer (400 kV) - Bherunda (TK) DC RVPNL 100
13 220 Aligarh - Atrauli line DC UPPTCL 77
14 220 Khandwa - Chhanera line DC MPPTCL 78
15 220LILO of one Ckt of Hadala - Sartanpar line
at Wankaner on MC towersDC GETCO 6
16 220 LILO of one Ckt of Vita - Miraj at Alkud ss DC MSETCL 27
17 220 Mendhigiri - Alkud ss DC MSETCL 110
667
1867
20(2)
Grand Total
2Transmission Lines (220 kV and above) CommissionedReady for commissioning During Oct-2018
As on 31-10-18
Voltage
Level (kV)Name of Transmission Lines
Circuit
Type
Executing
Agency
CENTRAL SECTOR
Total of CENTRAL SECTOR
STATE SECTOR Sector
Total of STATE SECTOR
File NoCEA-CH-14-1142018-Coordination Division
SN Contents Page
1 Executive summary of Target and Achievement of Substations during 2018-19 21(1)
2Sub Stations (220 kV and above) commissionedready for commisssioning during Oct-
201821(2)
Section D - Sub Stations
File NoCEA-CH-14-1142018-Coordination Division
1 Executive summary of Target and Achievement of Substations during 2018-19 As on Oct-18
(All figures in circuit MVA)
Centr
al S
ecto
r
Sta
te S
ecto
r
JV
Private
Secto
r
To
tal
Centr
al S
ecto
r
Sta
te S
ecto
r
JV
Private
Secto
r
To
tal
Centr
al S
ecto
r
Sta
te S
ecto
r
JV
Private
Secto
r
To
tal
Centr
al S
ecto
r
Sta
te S
ecto
r
JV
Private
Secto
r
To
tal
Centr
al S
ecto
r
Sta
te S
ecto
r
JV
Private
Secto
r
To
tal
Cen
tral S
ecto
r
Sta
te S
ecto
r
JV
Pri
vate
Secto
r
Gra
nd
To
tal
3000 0 0 3000 0 0 0 0 22200 0 0 22200 8185 13085 630 21900 740 14760 0 15500 34125 27845 630 62600
Oct18 Programme 0 0 0 0 0 0 0 0 0 0 0 0 1000 1260 630 2890 0 1400 0 1400 1000 2660 630 4290
Achievement 0 0 0 0 0 0 0 0 3000 0 0 3000 1500 3120 0 4620 0 2220 0 2220 4500 5340 0 9840
Upto Oct-18 Programme 0 0 0 0 0 0 0 0 10000 0 0 10000 6130 7435 630 14195 0 9670 0 9670 16130 17105 630 33865
Achievement 0 0 0 0 0 0 0 0 14000 0 0 14000 9000 7550 630 17180 0 10610 0 10610 23000 18160 630 41790
21(1)
220 kV Grand Total 800 kV 500 kV
Programme 2018-19
Programme
Achievement
HVDC765 kV 400 kV
File NoCEA-CH-14-1142018-Coordination Division
As on 31-10-18
Sl Voltage Ratio Capacity
No (kVkV) (MWMVA)
1 2 3 4 5
1 Cuddapah Ss 765400 PGCIL 3000
2 Tughlakabad SS (GIS) 400220 PGCIL 1500
Total of CENTRAL SECTOR 4500
3 Panki Kanpur (Aug) TF-I 400200 UPPTCL 75
4 Hindupur ss (1st ICT) 400220 APTRANSCO 315
5 Thappagundu ss 400110 TANTRANSCO 600
6 Mendhasal (2nd power TF) 400220 OPTCL 20
7 Jodhpur ss (New) 400220 RVPNL 315
8 Shankarpally 400220 TSTRANSCO 500
9 Podili ss (1st ICT) 400220 APTRANSCO 315
10 Doni (Gadag)SS 400220 KPTCL 1000
11 Porur (Addl TF) 230110 TANTRANSCO 100
12 Anuppankulam (Addl TF) 230110 TANTRANSCO 60
13 Neyveli SS 230110 TANTRANSCO 480
14 Savarkundla (Aug) 22066 GETCO 60
15 Bhuna (Aug) 220132 HVPNL 100
16 Madanpur (Aug) 22066 HVPNL 100
17 Gurgaon Sec-52A (Aug) 22066 HVPNL 160
18 IA Hisar (Aug) 220132 HVPNL 50
19 Narwana (Aug) 220132 HVPNL 60
20 Therubali (3rd Auto TF) 220132 OPTCL 160
21 Halasar ss 220132 RVPNL 160
22 Bansi Siddaharthnagar (Aug) TF-I 220132 UPPTCL 60
23 Hata Kushinagar (New) TF-I 220132 UPPTCL 100
24 Gomti nagar Lucknow (Aug) TF-IV 22033 UPPTCL 60
25 Kanpur Road Lucknow (New) TF-III 22033 UPPTCL 60
26 Asoj (Aug) 22066 GETCO 150
27 Kangasiyali (Aug) 22066 GETCO 60
28 Karmsad (Aug) 22066 GETCO 160
29 Lalpar (Aug) 22066 GETCO 60
TOTAL STATE SECTOR 5340
GRAND TOTAL 9840
21(2)
PRIVATE SECTOR
CENTRAL SECTOR
STATE SECTOR
2Sub-Stations (220 kV and above) CommissionedReady for commissioning During Oct-2018
Name of Sub StationsExecuting
Agency
File NoCEA-CH-14-1142018-Coordination Division
SN Contents Page
1 Electricity Generation (MU) Targets and Achievements for 2018-19 22
Section E - Electricity Generation
File NoCEA-CH-14-1142018-Coordination Division
Programme Achievement Ach Programme Achievement Ach
Central Sector 35160700 3028100 3162321 10443 20144400 21150469 10499
State Sector 35132000 3010000 3017260 10024 19922100 19549030 9813
PvtIPP Sector 36999700 3240600 3375603 10417 21598300 20794155 9628
PvtUTL Sector 1857600 164500 180597 10979 1130900 1203107 10638
Total 109150000 9443200 9735781 10310 62795700 62696761 9984
Central Sector 5617600 420900 451004 10715 4193000 4045436 9648
State Sector 6110600 559500 708469 12663 4049400 4433000 10947
PvtIPP Sector 1141800 80500 90122 11195 976400 1021963 10467
PvtUTL Sector 130000 11300 12564 11119 76700 99943 13030
Total 13000000 1072200 1262159 11772 9295500 9600342 10328
Central Sector 3850000 353300 303310 8585 2068900 2203540 10651
Total 3850000 353300 303310 8585 2068900 2203540 10651
Bhutan Import 500000 63300 35395 5592 347000 416660 12007
Central Sector 44628300 3802300 3916635 10301 26406300 27399445 10376
State Sector 41242600 3569500 3725729 10438 23971500 23982030 10004
Pvt Sector 40129100 3496900 3658886 10463 23782300 23119168 9721
Total 126500000 10932000 11336645 10370 74507100 74917303 10055
Provisional based on actual-cum-Assesment
Figs in MU
Cummulative
Achievement
Cummulative
Achievement
Sep-18 Sep-17 Upto Sep-2018 Upto Sep-2017
1073794 748889 7332680 5660929
22
Renewable Energy Generation
Achievement
Oct-2018
1 Electricity Generation (MU) Targets and Achievememts for 2018-19
All India Energy Generation During April 2018- Oct 2018 (MU)
Target (2018-19)April 2018- Oct 2018
Sector
Hydro
Thermal
Nuclear
627957
92955
20689
745071
626968
96003
22035
749173
0
100000
200000
300000
400000
500000
600000
700000
800000
Thermal Hydro Nuclear Total
Programme
Achievement
File NoCEA-CH-14-1142018-Coordination Division
SN Contents Page
1 Energy Power Supply Position (Provisional) for Oct-2018 and during April 2018- Oct 2018 23
2 Peak Power Supply Position (Provisional) for Oct-2018 and during April 2018- Oct 2018 24
3 Energy Power Supply Position (Revised) for Sep-2018 and during April 2018- Sept 2018 25
4 Peak Power Supply Position (Revised) for Sep-2018 and during April 2018- Sept 2018 26
5 Notified Power cuts Restrictions on Industries during Oct-2018 27
6 Power Supply to Agricultural Sector during Oct-2018 28
Section F - Power supply position
File NoCEA-CH-14-1142018-Coordination Division
आकड़ मममलयन यननट नट Figures in MU net
ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied
कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )
चडीगढ़ Chandigarh 108 108 0 00 1055 1055 0 00
दिलली Delhi 2490 2489 1 00 22524 22510 14 01
हरियजणज Haryana 4554 4554 0 00 35205 35205 0 00
दहमजचल परिश Himachal Pradesh 788 787 2 02 5728 5560 168 29
रमम कशमीि Jammu amp Kashmir 1497 1219 278 186 10982 8865 2117 193
परजब Punjab 4418 4418 0 00 38832 38819 13 00
िजरसथजन Rajasthan 6748 6748 0 00 45341 45181 160 04
उतति परिश Uttar Pradesh 10136 9973 164 16 75485 74808 676 09
उततिजखड Uttarakhand 1083 1081 3 03 8395 8310 85 10
उततरी कषतर Northern Region 31822 31375 447 14 243547 240314 3233 13
छततीसगढ़ Chhattisgarh 2454 2453 1 00 16119 16091 28 02
गरिजत Gujarat 11636 11636 0 00 70782 70768 14 00
मधय परिश Madhya Pradesh 5860 5859 1 00 38412 38410 2 00
महजिजषटर Maharashtra 15223 15095 128 08 95489 95355 134 01
िमन औि दिउ Daman amp Diu 216 216 0 00 1523 1523 0 00
िजिि व नगि हवली Dadra amp Nagar Haveli 553 553 0 00 3757 3757 0 00
गोवज Goa 366 366 0 00 2497 2495 2 01
पशचिमी कषतर Western Region 36308 36178 130 04 228579 228398 180 01
आनधर परिश Andhra Pradesh 5860 5854 6 01 37377 37334 43 01
तलगजनज Telangana 6748 6742 6 01 38251 38205 46 01
कनजाटक Karnataka 5842 5835 7 01 39111 39059 52 01
किल Kerala 2116 2096 20 09 14256 14160 96 07
तममल नजड Tamil Nadu 8611 8601 10 01 65742 65666 76 01
पडचिी Puducherry 216 215 1 05 1654 1646 8 05
लकष-दवीप Lakshadweep 4 4 0 0 27 27 0 0
दकषकषणी कषतर Southern Region 29392 29342 50 02 196390 196069 321 02
बबहजि Bihar 2742 2738 4 01 19143 18951 192 10
िजमोिि घजटी ननगम DVC 1712 1698 13 08 13096 12828 268 20
झजिखणड Jharkhand 701 697 4 06 5022 4949 73 15
ओडडशज Odisha 3147 3134 13 04 20224 20192 32 02
पशशचम बगजल West Bengal 4204 4200 4 01 33008 32881 127 04
मसशककम Sikkim 40 40 0 00 279 279 0 01
अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 67 202 188 13 67
परवी कषतर Eastern Region 12547 12507 40 03 90772 90080 692 08
अरणजचल परिश Arunachal Pradesh 67 66 1 09 502 496 7 13
असम Assam 833 809 24 29 6153 5903 250 41
मणणपि Manipur 72 71 1 10 485 478 7 14
मघजलय Meghalaya 147 147 0 00 1043 1042 0 00
ममज़ोिम Mizoram 63 62 1 08 365 359 5 14
नजगजलड Nagaland 76 67 8 110 540 481 59 109
बिपिज Tripura 130 129 1 09 1025 1007 19 18
उततर-परवी कषतर North-Eastern Region 1387 1351 35 25 10113 9766 346 34
समपणण भारत All India 111455 110753 702 06 769399 764627 4773 06
23
ऊराण वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Energy Power Supply Position Report (Provisional)
राजयStateअकरबर2018 October2018 अपरल2018 -अकरबर2018 April2018 to October2018
ऊरजा पनत ा म कमी ऊरजा पनत ा म कमीEnergy not Supplied
Excludes energy exported to Bangladesh
Energy not Supplied
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
File NoCEA-CH-14-1142018-Coordination Division
अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met
कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )
चडीगढ़ Chandigarh 217 217 0 00 369 369 0 00
दिलली Delhi 4713 4713 0 00 7016 7016 0 00
हरियजणज Haryana 7948 7948 0 00 10270 10270 0 00
दहमजचल परिश Himachal Pradesh 1520 1520 0 00 1520 1520 0 00
रमम कशमीि Jammu amp Kashmir 2836 2269 567 200 2951 2361 590 200
परजब Punjab 7979 7979 0 00 12638 12638 0 00
िजरसथजन Rajasthan 11450 11450 0 00 11698 11698 0 00
उतति परिश Uttar Pradesh 17434 16745 688 39 20498 20062 436 21
उततिजखड Uttarakhand 1943 1943 0 00 2143 2143 0 00
उततरी कषतर Northern Region 50659 49635 1024 20 63166 61726 1440 23
छततीसगढ़ Chhattisgarh 4414 4268 146 33 4414 4268 146 33
गरिजत Gujarat 18148 18130 19 01 18148 18130 19 01
मधय परिश Madhya Pradesh 11356 11317 39 03 11356 11317 39 03
महजिजषटर Maharashtra 23864 23159 705 30 23864 23254 610 26
िमन औि दिउ Daman amp Diu 342 341 1 02 357 356 1 02
िजिि व नगि हवली Dadra amp Nagar Haveli 784 780 4 05 816 815 1 01
गोवज Goa 536 536 0 00 596 596 0 00
पशचिमी कषतर Western Region 56548 55695 853 15 56548 55695 853 15
आनधर परिश Andhra Pradesh 9435 9435 0 00 9435 9435 0 00
तलगजनज Telangana 10603 10603 0 00 10815 10815 0 00
कनजाटक Karnataka 10741 10741 0 00 10741 10741 0 00
किल Kerala 3727 3644 83 22 4050 3997 53 13
तममल नजड Tamil Nadu 14747 14333 414 28 15029 14981 47 03
पडचिी Puducherry 363 362 1 03 420 400 19 46
लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0
दकषकषणी कषतर Southern Region 45279 45226 53 01 45946 45684 262 06
बबहजि Bihar 4945 4945 0 00 5050 5045 5 01
िजमोिि घजटी ननगम DVC 2729 2729 0 00 2874 2874 0 00
झजिखणड Jharkhand 1260 1260 0 00 1339 1284 55 41
ओडडशज Odisha 5624 5224 400 71 5624 5357 268 48
पशशचम बगजल West Bengal 8775 8775 0 00 9130 9123 7 01
मसशककम Sikkim 86 86 0 00 90 90 0 00
अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7
परवी कषतर Eastern Region 22959 22567 392 17 22959 22567 392 17
अरणजचल परिश Arunachal Pradesh 138 125 13 94 138 133 5 37
असम Assam 1785 1704 81 45 1865 1809 56 30
मणणपि Manipur 187 185 2 11 193 186 7 36
मघजलय Meghalaya 336 336 0 00 371 368 2 07
ममज़ोिम Mizoram 99 97 2 20 103 98 4 41
नजगजलड Nagaland 134 131 3 22 156 138 18 117
बिपिज Tripura 269 269 0 00 298 293 5 17
उततर-परवी कषतर North-Eastern Region 2790 2700 90 32 2967 2850 117 39
समपणण भारत All India 172945 170604 2341 14 177022 175528 1494 08
24
अधिकतम वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Peak Power Supply Position Report (Provisional)
आकड़ मगज वजट नट Figures in MW netअपरल2018 -अकरबर2018 April2018 to October2018
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
मजग की पनता म कमी Demand not Met
Excludes the supply to Bangladesh
राजयStateअकरबर2018 October2018
मजग की पनता म कमी Demand not Met
File NoCEA-CH-14-1142018-Coordination Division
आकड़ मममलयन यननट नट Figures in MU net
ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied
कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )
चडीगढ़ Chandigarh 141 141 0 00 947 947 0 00
दिलली Delhi 2925 2924 1 00 20034 20021 13 01
हरियजणज Haryana 4794 4794 0 00 30651 30651 0 00
दहमजचल परिश Himachal Pradesh 876 853 24 27 4940 4773 167 34
रमम कशमीि Jammu amp Kashmir 1520 1246 274 180 9485 7646 1839 194
परजब Punjab 5575 5575 0 00 34414 34401 13 00
िजरसथजन Rajasthan 6202 6201 0 00 38594 38434 160 04
उतति परिश Uttar Pradesh 10211 10124 86 08 65349 64836 513 08
उततिजखड Uttarakhand 1162 1149 13 11 7311 7229 82 11
उततरी कषतर Northern Region 33405 33008 398 12 211725 208939 2786 13
छततीसगढ़ Chhattisgarh 2403 2388 15 06 13665 13638 27 02
गरिजत Gujarat 10122 10122 0 00 59146 59132 14 00
मधय परिश Madhya Pradesh 5492 5491 1 00 32552 32551 1 00
महजिजषटर Maharashtra 13615 13612 3 00 80266 80260 6 00
िमन औि दिउ Daman amp Diu 221 221 0 00 1306 1306 0 00
िजिि व नगि हवली Dadra amp Nagar Haveli 551 551 0 00 3204 3204 0 00
गोवज Goa 339 339 0 00 2131 2128 2 01
पशचिमी कषतर Western Region 32742 32723 19 01 192270 192220 50 00
आनधर परिश Andhra Pradesh 5294 5287 7 01 31518 31480 37 01
तलगजनज Telangana 6279 6272 8 01 31503 31463 40 01
कनजाटक Karnataka 5701 5693 8 01 33269 33225 45 01
किल Kerala 2050 2026 24 12 12140 12063 76 06
तममल नजड Tamil Nadu 8971 8959 12 01 57131 57065 66 01
पडचिी Puducherry 226 224 2 08 1438 1431 7 05
लकष-दवीप Lakshadweep 4 4 0 0 23 23 0 0
दकषकषणी कषतर Southern Region 28520 28460 60 02 166998 166727 271 02
बबहजि Bihar 2839 2793 46 16 16400 16213 188 11
िजमोिि घजटी ननगम DVC 1901 1750 151 79 11384 11130 254 22
झजिखणड Jharkhand 740 723 17 22 4321 4252 69 16
ओडडशज Odisha 2921 2918 3 01 17077 17058 19 01
पशशचम बगजल West Bengal 4902 4879 23 05 28804 28681 123 04
मसशककम Sikkim 39 39 0 01 239 239 0 01
अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 67 173 162 12 67
परवी कषतर Eastern Region 13341 13102 240 18 78225 77573 652 08
अरणजचल परिश Arunachal Pradesh 74 73 1 10 435 429 6 14
असम Assam 950 914 36 38 5320 5094 226 43
मणणपि Manipur 70 69 1 11 414 408 6 15
मघजलय Meghalaya 150 150 0 01 896 896 0 01
ममज़ोिम Mizoram 58 57 1 12 302 297 5 16
नजगजलड Nagaland 80 72 8 104 464 414 50 108
बिपिज Tripura 192 191 1 07 895 878 17 19
उततर-परवी कषतर North-Eastern Region 1575 1527 48 31 8726 8415 311 36
समपणण भारत All India 109584 108819 765 07 657944 653873 4071 06
Energy not Supplied Energy not Supplied
ससतबर2018 September2018 अपरल2018 -ससतबर2018 April2018 to September2018
ऊरजा पनत ा म कमी ऊरजा पनत ा म कमी
Excludes energy exported to Bangladesh
राजयState
ऊराण वरवदयत आपरतण शथिरत ररपोरण (सशोधित) Energy Power Supply Position Report (Revised)
25
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
File NoCEA-CH-14-1142018-Coordination Division
अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met
कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )
चडीगढ़ Chandigarh 293 293 0 00 369 369 0 00
दिलली Delhi 5358 5358 0 00 7016 7016 0 00
हरियजणज Haryana 9008 9008 0 00 10270 10270 0 00
दहमजचल परिश Himachal Pradesh 1466 1466 0 00 1479 1479 0 00
रमम कशमीि Jammu amp Kashmir 2951 2361 590 200 2951 2361 590 200
परजब Punjab 11405 11405 0 00 12638 12638 0 00
िजरसथजन Rajasthan 10612 10612 0 00 11698 11698 0 00
उतति परिश Uttar Pradesh 18346 18121 225 12 20498 20062 436 21
उततिजखड Uttarakhand 1996 1996 0 00 2143 2143 0 00
उततरी कषतर Northern Region 56407 55649 758 13 63166 61726 1440 23
छततीसगढ़ Chhattisgarh 4404 4075 328 75 4404 4136 268 61
गरिजत Gujarat 16963 16963 0 00 17053 16963 90 05
मधय परिश Madhya Pradesh 8811 8771 41 05 8811 8775 36 04
महजिजषटर Maharashtra 22455 22349 106 05 23395 23254 141 06
िमन औि दिउ Daman amp Diu 357 356 1 02 357 356 1 02
िजिि व नगि हवली Dadra amp Nagar Haveli 816 815 1 01 816 815 1 01
गोवज Goa 596 596 0 00 596 596 0 00
पशचिमी कषतर Western Region 52933 52895 38 01 53841 52895 945 18
आनधर परिश Andhra Pradesh 9435 9416 19 02 9435 9416 19 02
तलगजनज Telangana 10815 10815 0 00 10815 10815 0 00
कनजाटक Karnataka 10103 10090 13 01 10690 10688 2 00
किल Kerala 3888 3638 251 64 4050 3997 53 13
तममल नजड Tamil Nadu 14556 14553 3 00 15029 14981 47 03
पडचिी Puducherry 390 372 17 45 420 400 19 46
लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0
दकषकषणी कषतर Southern Region 45542 45428 114 02 45946 45684 262 06
बबहजि Bihar 5050 5045 5 01 5050 5045 5 01
िजमोिि घजटी ननगम DVC 2641 2641 0 00 2874 2874 0 00
झजिखणड Jharkhand 1233 1233 0 00 1339 1284 55 41
ओडडशज Odisha 4906 4906 0 00 5357 5357 0 00
पशशचम बगजल West Bengal 8644 8639 5 01 9130 9123 7 01
मसशककम Sikkim 78 78 0 00 90 90 0 00
अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7
परवी कषतर Eastern Region 22110 22100 10 00 22470 22290 180 08
अरणजचल परिश Arunachal Pradesh 132 130 2 15 138 133 5 37
असम Assam 1865 1809 56 30 1865 1809 56 30
मणणपि Manipur 184 182 2 13 193 186 7 36
मघजलय Meghalaya 317 317 0 00 371 368 2 07
ममज़ोिम Mizoram 95 93 2 23 103 98 4 41
नजगजलड Nagaland 142 138 5 32 156 138 18 117
बिपिज Tripura 296 293 3 10 298 293 5 17
उततर-परवी कषतर North-Eastern Region 2921 2850 71 24 2967 2850 117 39
समपणण भारत All India 177022 175528 1494 08 177022 175528 1494 08
26
मजग की पनता म कमी मजग की पनता म कमी Demand not MetDemand not Met
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
Excludes the supply to Bangladesh
अधिकतम वरवदयत आपरतण शथिरत ररपोरण (सशोधित) Peak Power Supply Position Report (Revised)
आकड़ मगज वजट नट Figures in MW net
राजयStateससतबर2018 September2018 अपरल2018 -ससतबर2018 April2018 to September2018
File NoCEA-CH-14-1142018-Coordination Division
अकरबर2018 October2018अपरल2018 -अकरबर2018 April2018 to October2018
उततरी कषतर Northern Region
चडीगढ़ Chandigarh Data not received Data not received
दिलली Delhi
हरियजणज Haryana
दहमजचल परिश Himachal Pradesh
रमम कशमीि Jammu amp Kashmir Data not received Data not received
परजब Punjab
िजरसथजन Rajasthanउतति परिश Uttar Pradesh
उततिजखड Uttarakhand
पशचिमी कषतर Western Region
छततीसगढ़ Chhattisgarh
गरिजत Gujarat
मधय परिश Madhya Pradesh
महजिजषटर Maharashtra
गोवज Goa
दकषकषणी कषतर Southern Region
आनधर परिश Andhra Pradesh
तलगजनज Telangana
कनजाटक Karnataka
किल Kerala
तममल नजड Tamil Nadu
पडचिी Puducherryपरवी कषतर Eastern Region
बबहजि Bihar
झजिखणड Jharkhand
ओडडशज Odisha
पशशचम बगजल West Bengal
N
o No
tified
Cuts
N
o No
tified
Cuts
27
अकरबर 2018 म इडथरीर पर वरवदयत करौती का वरवरवरण Notified Power CutsRestrictions on Industries during October2018
राजय कषतर State Regionऊराणमाग करौती EnergyDemand Cut
No Notified Cuts No Notified Cuts
File NoCEA-CH-14-1142018-Coordination Division
अकरबर2018 October2018अपरल2018 -अकरबर2018 April2018 to October2018
उततरी कषतर Northern Region
चडीगढ़ Chandigarh Data not received Data not received
दिलली Delhi Data not received Data not received
हरियजणज Haryana 940 hrsday 0709 - 0950 hrsday
दहमजचल परिश Himachal Pradesh No cut imposed on agriculture consumers and uninterrupted
power is being supplied to agriculture sector
HPSEBL has only 2 agriculture consumers and uninterrupted
power is being supplied to agriculture sector
रमम कशमीि Jammu amp Kashmir Data not received Data not received
परजब Punjab 0507 hrsday 0349 - 0844 hrsday
िजरसथजन Rajasthan 0630 hrsday 0630 hrsday
उतति परिश Uttar Pradesh 1825 hrsday 1814 - 1858 hrsday
उततिजखड Uttarakhand 2350 hrsday 2128 - 2357 hrsday
पशचिमी कषतर Western Region
छततीसगढ़ Chhattisgarh 18hoursday 18 hrsday
गरिजत Gujarat 805 hrsday 805 hrsday
मधय परिश Madhya Pradesh Three-Phase Supply(Irrigation)-947 hrs day
Three-Phase (Mixed) Supply - 2311 hrs day
Three-Phase Supply(Irrigation)- 0933 - 0947 hrs day Three-
Phase (Mixed) Supply - 2300 - 2320 hrs day
महजिजषटर Maharashtra Three-Phase Supply(Irrigation)- 9 hrs day
Three-Phase (Mixed) Supply - 24 hrs day
Three-Phase Supply(Irrigation)- 9 hrs day
Three-Phase (Mixed) Supply - 24 hrs day
गोवज Goa No restriction No restriction
दकषकषणी कषतर Southern Region
आनधर परिश Andhra Pradesh 07 hrsday 07 hrsday
तलगजनज Telangana 24 hoursday 24 hoursday
कनजाटक Karnataka 6 hrsday 6 hrsday
किल Kerala No Restrictions No Restrictions
तममल नजड Tamil Nadu 9 hrsday (6 hrs during day time and 3 hrs during night time) 9 hrsday (6 hrs during day time and 3 hrs during night time)
पडचिी Puducherry No Restrictions No Restrictions
परवी कषतर Eastern Region
बबहजि Bihar About 18 hrsday About 18 hrsday
झजिखणड Jharkhand About 20 hrsday About 20 hrsday
ओडडशज Odisha 24 hrsday 24 hrsday
पशशचम बगजल West Bengal About 23 hrsday About 23 hrsday
28
अकटबर 2018 कषि कषतर को षिदयत आपरति का षििरण Power Supply to Agricultural Sector during October2018
राजय कषतर State Regionऔसत वरवदयत आपरतण घनरो म Average Hours of Supply
On segregated feeders
File NoCEA-CH-14-1142018-Coordination Division
SNo Contents Page
1 Growth of Installed Capacity since 6th Plan 29
2 Progress of Transmission Sector since 6th Plan 30
3 All India Yearly Coal consumption for Power Generation (Utilities)
4 All India Annual Per Capita Consumption of Electricity since -2006
5 Average cost of power supply amp Average realisation (Paisakwh)
6 Growth of Rural Electrification amp Pump Sets Energisation
7 Status of Hydro Schemes Cleared by the CEA in Oct-2018
Section G - Growth of Power Sector
31
32
File NoCEA-CH-14-1142018-Coordination Division
(In MW)
Coal Gas Diesel Total
End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472
End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634
End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537
End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596
End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921
End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703
End of 12th Plan 19216288 2532938 83763 21832988 6780 4447842 50018 31960630
Up to Oct-2018 19599250 2493722 837629 22176734 6780 4548742 7201281 34604757
Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-17) = 51529 MW
Electricity Generation (MU) Targets and Achievements for 2016-17
Coal Gas Diesel Nuclear Hydro Res Total
1959925 2493722 837629 678000 454874 72012805 22925174
29
1 Growth of Installed Capacity Since 6th Plan
Plan YearThermal
Nuclear Hydro RES (MNRE) Total
Total Installed Capacity 34604757 MW
Coal Gas Diesel Nuclear Hydro Res
File NoCEA-CH-14-1142018-Coordination Division
Progress of Transmission Sector in the Country up to Oct 2018
1 TRANSMISSION LINES (All fig in CKM)
At the end of
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
6th plan 0 0 0 0 0 0 0 0 0 0 0 0 1831 4198 0 6029 1641 44364 0 46005 3472 48562 0 52034
7th plan 0 0 0 0 0 0 0 0 0 0 0 0 13068 6756 0 19824 4560 55071 0 59631 17628 61827 0 79455
8th plan 0 0 0 0 1634 0 0 1634 0 0 0 0 23001 13141 0 36142 6564 73036 0 79600 31199 86177 0 117376
9th plan 0 0 0 0 3234 1504 0 4738 751 409 0 1160 29345 20033 0 49378 8687 88306 0 96993 42017 110252 0 152269
10th plan 0 0 0 0 4368 1504 0 5872 1775 409 0 2184 48708 24730 0 73438 9444 105185 0 114629 64295 131828 0 196123
11th Plan 0 0 0 0 5948 1504 1980 9432 4839 411 0 5250 71023 30191 5605 106819 10140 125010 830 135980 91950 157116 8415 257481
12th Plan 6124 0 0 6124 5948 1504 1980 9432 25465 1177 4598 31240 92482 48240 17065 157787 11014 151276 978 163268 141033 202197 24621 367851
13th Plan (Up
to Mar2018)6124 0 0 6124 5948 1504 1980 9432 28666 1512 4881 35059 98247 54286 19067 171600 11258 156497 1000 168755 150243 213799 26928 390970
13th Plan (Up
to Sep-18)6124 0 0 6124 5948 1504 1980 9432 30952 1512 5059 37523 99683 56069 20662 176414 11318 160958 1000 173276 154025 220043 28701 402769
27150
75050
47900
118050
90650
30
IR addition in 12th Plan (up to
March 2017)
Total IR (up to Oct-18)
IR at the end of 11th Plan
IR at the end of 12th Plan
Envisaged IR Capacity at the end
of 13th Plan
Grand Total
Note - The figure upto the end of 10th plan in for stringing progress including the lines not commissioned Now only commissioned lines are reckoned Accordingly the figure for 10th plan (end) may read as 187555 after adjusting with (-) 10852 Ckm
Inter-regional Power Transfer Capacity
plusmn 800 kV HVDC plusmn 500 kV HVDC 765 kV 400 kV 220 kV
File NoCEA-CH-14-1142018-Coordination Division
2004-05 27800
2005-06 28100
2006-07 30200
2007-08 33000
2008-09 35500
2009-10 36700
2010-11 38700
2011-12 41756
2012-13 45460
2013-14 48940
2014-15 53040
2015-16 54590
2016-17 57430
2017-18 60800
Year
2005-06
2006-07
2007-08
2008-09
2009-10
2010-11
2011-12
2012-13
2013-14
2014-15
2015-16
2016-17
2017-18
2004-05 254 209 7568
2005-06 260 221 7636
2006-07 276 227 7423
2007-08 293 239 7727
2008-09 340 263 8713
2009-10 355 268 8870
2010-11 398 303 11975
2011-12 455 330 13514
2012-13 501 376 14867
2013-14 518 175
2014-15 520
6719
7171
3 All India yearly Coal Consumption for Power Generation (Utilities)
YEARCoal Consumption
Million Tonnes
4 All India Annual per Capita consumption of Electricity Since 2006
Per Capita Consumption ( kWh)
6314
(GrossGen+ Net Import) Mid-year population
5 Average cost of power supply amp average realization ( paiseKWH )
Yearcost of supply
(paiseunit)
Realization(paiseunit)
Including AgricultureOnly
Agriculture
1149
7335
7786
91441
8188
88363
957
1010
1075
1122
File NoCEA-CH-14-1142018-Coordination Division
Source- PFC Reports on the performance of State Power Utilities 31
File NoCEA-CH-14-1142018-Coordination Division
Sl
NoExecuting Agency
Installed
Capacity (MW)Cost (Rs crore)
Date of
Clearance
32
No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification
since 2004-05
65291374575 296361511th Plan
Cumu upto End of 11th Plan
596556 21212860
557439Cummulative up to end of 12th Plan
46708
18423975
499150
2003-042004-05
5743
9769
Cumu upto End of 10th Plan
010407 to 310308
010410 to 310311557976840909
010411 to 310312
412667
86293726
3207
482864
12632
1576036
4451722594
15455554
2314176
397343611750
2093311060316074
65109527813884
6 Growth Of Rural Electrification amp Pumpsets Energisation
Plan Year
9th Plan2002-03
134092626
4111
Pump Sets Energised Villages Electricfied (Nos)
2001-02
284064367244
1218
27801997-981998-991999-002000-01
297594
010408 to 310309010409 to 310310
10th Plan
2005-062006-07
322968331020
Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as
Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received
from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made
available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified
villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is
independent of the earlier published reports
No Hydro Electric Project has been issued concurrenceAppraisal letter by CEA during October 2018
7 Status of Hydro Schemes Cleared by the CEA in Oct-2018
Name of Scheme
File NoCEA-CH-14-1142018-Coordination Division
SN Contents Page
1 Rate of sale of power for the year 2016-17 33-41
RATE OF SALE OF POWER FOR THE YEAR 2016-17
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) NORTHERN REGION
CENTRAL SECTOR
BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 18000 66900 19800
CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 54000 222400 21600
CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 30000 144400 19600
CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 23100 91700 42600
PARBATI - III HPS NHPC LTD HYDRO-HYDRO 52000 68200 54800
DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 28000 95600 30000
CHUTAK NHPC LTD HYDRO-HYDRO 4400 22000 79800
DULHASTI HPS NHPC LTD HYDRO-HYDRO 39000 228000 56400
SALAL HPS NHPC LTD HYDRO-HYDRO 69000 342300 11000
TANAKPUR HPS NHPC LTD HYDRO-HYDRO 9420 43000 29600
URI HPS -I NHPC LTD HYDRO-HYDRO 48000 280300 16000
URI HPS - II NHPC LTD HYDRO-HYDRO 24000 147300 48600
NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 4500 24600 88200
SEWA - II NHPC LTD HYDRO-HYDRO 12000 47100 43400
ANTA CCPP NTPC LTD THERMAL-GASN 41930 67539 32400
AURAIYA CCPP NTPC LTD THERMAL-GASN 66336 53501 39100
BADARPUR TPS NTPC LTD THERMAL-COAL 70500 159153 44800
DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 84000 296170 42300
DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 98000 526686 46300
DADRI CCPP NTPC LTD THERMAL-GASHSD 82978 227469 33000
FARIDABAD CCPP NTPC LTD THERMAL-GASN 43159 115577 30800
RIHAND STPS I NTPC LTD THERMAL-COAL 100000 596766 24500
RIHAND STPS II NTPC LTD THERMAL-COAL 100000 737069 24600
RIHAND STPS III NTPC LTD THERMAL-COAL 100000 706546 30600
SINGRAULI STPS NTPC LTD THERMAL-COAL 200000 1394068 20400
TANDA TPS NTPC LTD THERMAL-COAL 44000 295438 40800
UNCHAHAR TPS I NTPC LTD THERMAL-COAL 42000 256454 39800
UNCHAHAR TPS II NTPC LTD THERMAL-COAL 42000 273577 38900
UNCHAHAR TPS III NTPC LTD THERMAL-COAL 21000 142780 43000
KOLDAM NTPC LTD HYDRO-HYDRO 80000 363260 43600
NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 303575 25841
RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 108000 668677 35374
NJHPS SJVNL HYDRO-HYDRO 150000 699496 23820
RAMPUR HPS SJVNL HYDRO-HYDRO 41202 195982 32260
TEHRI HPP THDC HYDRO-HYDRO 100000 272543 51800
KOTESHWAR HEP THDC HYDRO-HYDRO 40000 106244 53400
IGSTPS JHAJJAR ARAVALI P CPL THERMAL-COAL 150000 510429 49490
NEYVELI BARSINGSAR NEYVELI LIG CORP LTD THERMAL-LIG 25000 127520 38040
STATE SECTOR
PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 21000 14222 48200
PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 21000 19205 48400
PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 25000 102257 42600
PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 25000 62107 41800
DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 60000 312213 41000
RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 120000 35767442200
WYC HYDEL STATION HPGCL HYDRO-HYDRO 6240 20365 24900
GIRI POWER HOUSE HPSEB HYDRO-HYDRO 6000 13958 7600
ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 1695 5467 11900
BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 12000 18528 6700
GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 2250 7462 22500
BASSI POWER HOUSE HPSEB HYDRO-HYDRO 6600 29649 7500
BINWA POWER HOUSE HPSEB HYDRO-HYDRO 600 2749 19300
ANNEXURE-I
RATE OF SALE OF POWER FOR THE YEAR 2016-2017
Page 33
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) GAJ POWER HOUSE HPSEB HYDRO-HYDRO 1050 2914 26700
BANER POWER HOUSE HPSEB HYDRO-HYDRO 1200 2864 16200
HOLI POWER HOUSE HPSEB HYDRO-HYDRO 300 616 22500
THIROT POWER HOUSE HPSEB HYDRO-HYDRO 450 1126 22500
KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 1200 3064 22500
LARJI POWER HOUSE HPSEB HYDRO-HYDRO 12600 53677 23700
NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 250 750 31000
CHABA POWER HOUSE HPSEB HYDRO-HYDRO 175 465 23300
RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 150 101 13400
SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 200 000 22500
KILLAR HPSEB HYDRO-HYDRO 030 050 22500
BHABA AUGUMENP H HPSEB HYDRO-HYDRO 450 1276 22500
BS CHAMBA HPSEB HYDRO-HYDRO 045 099 19500
GUMMA HPSEB HYDRO-HYDRO 300 423 22500
GAS TURBINE POWER STATION IPGCL THERMAL-GAS 27000 67233 39300
PPS-I PPCL THERMAL-GAS 33000 175905 38300
PPS-III PPCL THERMAL-GAS 137120 196879 36100
LOWER JHELUM JampKPDD HYDRO-HYDRO 10500 60214 5100
UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 2260 10514 6300
UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 10500 44202 8500
GANDHARBAL JampKPDD HYDRO-HYDRO 1500 8925 4700
KARNAH MPH JampKPDD HYDRO-HYDRO 200 1122 31000
CHENANI I JampKPDD HYDRO-HYDRO 2330 10892 6600
CHENANI II JampKPDD HYDRO-HYDRO 200 1188 9300
CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 750 3634 14200
IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 375 2108 18500
IGO MERCHELLONG JampKPDD HYDRO-HYDRO 300 1572 29700
PAHALGAM MHP JampKPDD HYDRO-HYDRO 450 1713 32900
MARPACHOO JampKPDD HYDRO-HYDRO 075 375 29800
HAFTAL JampKPDD HYDRO-HYDRO 100 483 28700
SANJAK JampKPDD HYDRO-HYDRO 126 441 36000
SEWA-III JampKPDD HYDRO-HYDRO 900 3273 20200
BHADERWAH JampKPDD HYDRO-HYDRO 150 935 8900
BAZGO JampKPDD HYDRO-HYDRO 030 108 33300
SUMOOR JampKPDD HYDRO-HYDRO 010 045 35400
HUNDER JampKPDD HYDRO-HYDRO 040 176 26200
STAKNA JampKPDD HYDRO-HYDRO 400 1933 4100
KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 124000 662879 31360
SURATGARH TPS RRVUNL THERMAL-COAL 150000 402328 41730
CHHABRA TPS 1amp 2 RRVUNL THERMAL-COAL 50000 305946 36700
CHHABRA TPS 3 RRVUNL THERMAL-COAL 25000 151536 36700
CHHABRA TPS 4 RRVUNL THERMAL-COAL 25000 155896 36700
RAMGARH GT POWER PROJECT RRVUNL THERMAL-COAL 22050 43177 41800
RAMGARH GAS T P PROJECT 3 RRVUNL THERMAL-GAS 5000 93615 41800
DHOLPUR C C POWER PROJECT RRVUNL THERMAL-R-LNG 33000 9486 46110
MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 14000 20855 34192
MINI MICRO HYDEL (MMH) P S RRVUNL HYDRO-HYDRO 2385 851 37800
KALISINDH TPP 1 RRVUNL THERMAL-COAL 60000 341543 45000
KALISINDH TPP 2 RRVUNL THERMAL-COAL 60000 211588 45000
KHARA HEP UPJVNL HYDRO-HYDRO 7200 26654 7200
MATATILLA HEP UPJVNL HYDRO-HYDRO 3060 12219 6500
OBRA HEP UPJVNL HYDRO-HYDRO 9900 21517 6300
RIHAND UPJVNL HYDRO-HYDRO 30000 57369 5500
ANPARA A TPS UPRVUNL THERMAL-COAL 63000 317536 27000
ANPARA B TPS UPRVUNL THERMAL-COAL 100000 705605 22700
ANPARA D UPRVUNL THERMAL-COAL 100000 300158 39800
HARDUAGANJ TPS UPRVUNL THERMAL-COAL 16500 45817 49200
HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 50000 304389 46600
OBRA A TPS UPRVUNL THERMAL-COAL 28800 13158 34000
OBRA B TPS UPRVUNL THERMAL-COAL 100000 328124 21900
Page 34
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) PANKI TPS UPRVUNL THERMAL-COAL 21000 66488 50300
PARICHHA TPS UPRVUNL THERMAL-COAL 22000 38762 49400
PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 42000 231931 45600
PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 50000 276722 50400
CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 24000 70845 8290
CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 14400 75366 8390
DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 3375 9595 12080
DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 5100 18701 10520
KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4140 17359 12330
KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 12000 33001 9420
KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 3000 11953 8320
TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 9000 33983 12460
MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 30400 124510 16110
RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 19800 17897 10550
MPUR UTTARAKHAND JVNL HYDRO-HYDRO 930 5121 19200
PATHRI UTTARAKHAND JVNL HYDRO-HYDRO 2040 11636 14200
GALOGI UTTARAKHAND JVNL HYDRO-HYDRO 300 648 12500
PRIVATE SECTOR
MGTPP CLP INDIA PVT LTD THERMAL-COAL 132000 268902 41940
SHRINAGAR HEP ALAKNANDA HPCL HYDRO-HYDRO 33000 127414 48800
GAMA INFRAPROP CCPP GAMA INFRAPROP PVT THERMAL-GAS 22500 52686 47000
PPGCL (BARA) JP POWER VENTURES LTD THERMAL-COAL 198000 448200 38500
MALANA HEP MALANA PCL HYDRO-HYDRO 8600 26354 29792
MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 10000 30369 32580
ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 19200 56347 36079
KASHANG HEP H P PCL HYDRO-HYDRO 19500 5034 29200
BASPA-II HEP HBPCL HYDRO-HYDRO 30000 132769 13600
KARCHAM WANGTOO HEP HBPCL HYDRO-HYDRO 100000 434386 36600
RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 108000 582600 43700
RITHALA COMBI CY POWER PLANT TATA POWER DDL THERMAL-GAS 9480 000 11900
RAJPURA TPS NABHA POWER LTD THERMAL-GAS 140000 901484 39000
TALWANDI SABO POWER LTD TALWANDI SABO POWER LTD THERMAL-COAL 198000 636040 49548
ROJA THERMAL POWER STATION ROJA POWER SCL THERMAL-COAL 120000 727200 43400
KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 34400 63400
BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 36000 62600
MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 38200 60800
UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 37900 61500
KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 42300 58800
LALITPUR PGCL BAJAJ ENERGY PVT LTD THERMAL-COAL 198000 359400 47300
PRAYAGRAJ PGCL PRAYAGRAJ PGCL THERMAL-COAL 132000 448200 38595
KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 132000 783182 33438
WESTERN REGION
CENTRAL SECTOR
INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 100000 325333 23892
OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 52000 141663 34001
GANDHAR CCPP NTPC LTD THERMAL-GAS 65739 221924 28700
KAWAS CCPP NTPC LTD THERMAL-GASN 65620 167929 27000
KORBA I amp II NTPC LTD THERMAL-COAL 210000 1499171 20500
KORBA III NTPC LTD THERMAL-COAL 50000 358746 26600
SIPAT STPS I NTPC LTD THERMAL-COAL 198000 1479902 26800
SIPAT STPS II NTPC LTD THERMAL-COAL 100000 766549 26500
VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 126000 693142 25800
VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 100000 608781 23800
VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 100000 673475 27600
VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 100000 655924 32900
VINDHYACHAL STPS V NTPC LTD THERMAL-COAL 50000 328265 31700
MOUDA I NTPC LTD THERMAL-COAL 100000 343130 44500
MOUDA Ii NTPC LTD THERMAL-COAL 66000 40637 39900
RATNAGIRI GAS amp POWER PVT LTD RGPPL THERMAL-GAS 196708 442485 47000
KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 000 24729
TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 32000 201227 10740
Page 35
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 365122 19069
TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 787444 29324
STATE SECTOR
GSEG-HAZIRA15610 MW GUJARAT S ENEGEN LTD THERMAL-GAS 15610 1805 28200
GSEG-HAZIRA35143 MW GUJARAT S ENEGEN LTD THERMAL-GAS 35130 22276 51300
GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 21978 51800
AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 13929 26100
KORBA TPS EAST CSPGCL THERMAL-COAL 44000 198673 33880
DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 365808 27570
KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 316500 30420
HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 532878 19410
CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 515 58300
MTTPS CHAMPA U-I CSPGCL THERMAL-COAL 50000 220376 39000
MTTPS CHAMPA U-II CSPGCL THERMAL-COAL 50000 23709 10000
SHP GANGREL CSPGCL HYDRO-HYDRO 1000 2350 36790
BANGO HEP CSPGCL HYDRO-HYDRO 12000 14662 8900
MHP KORBA WEST CSPGCL HYDRO-HYDRO 170 859 38190
SIKASAR HEP CSPGCL HYDRO-HYDRO 700 418 26870
DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8843 74500
DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 19446 51500
GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 66388 71600
GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127488 41300
KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 96072 43900
KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 29841 56400
SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 184966 58800
UKAI 1-5 GSECL THERMAL-COAL 85000 204891 46900
UKAI TPS 6 GSECL THERMAL-COAL 50000 284448 48200
WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 271999 58300
WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 82808 44100
KADANA HPS GSECL HYDRO-HYDRO 24200 34433 16800
UKAI HPS GSECL HYDRO-HYDRO 30500 40585 6100
TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 123000 11500
BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 8900 10900
BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 7200 27500
JHINNA HPS MPPGCL HYDRO-HYDRO 2000 9700 18500
RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 44300 3400
GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 17300 4600
SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 4100 16900
MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 14600 27000
PENCH HPS MPPGCL HYDRO-HYDRO 16000 23700 8100
RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 3000 16900
AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 134400 35100
SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 283800 38700
SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 344600 34300
SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 111600 61600
SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 211800 58000
SSTPS PH-I MPPGCL THERMAL-COAL 120000 233100 84300
BHUSAWAL TPS MSPGCL THERMAL-COAL 142000 566258 51100
CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1365682 33700
KHAPERKHEDA MSPGCL THERMAL-COAL 134000 706207 39100
KORADI TPS MSPGCL THERMAL-COAL 62000 443206 42000
NASIK TPS MSPGCL THERMAL-COAL 63000 297275 47000
PARLI TPS MSPGCL THERMAL-COAL 113000 175934 71600
PARAS MSPGCL THERMAL-COAL 50000 267931 38700
URAN CCPP MSPGCL THERMAL-GAS 67200 320330 30600
KOYANA MSPGCL HYDRO-HYDRO 195600 328155 13100
SMALL HYDRO POWER PLANTS MSPGCL HYDRO-HYDRO 45400 93062 30500
BHIRA MSPGCL HYDRO-HYDRO 8000 10046 8400
TILLARI MSPGCL HYDRO-HYDRO 8900 10584 3100
SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 233298 20500
SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 87633 20500
PRIVATE SECTOR
Page 36
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 81282 46750
JNSTPP(JAYPEE NIGRIE) JP POWER VENTURES LTD THERMAL-COAL 132000 726695 29310
MB POWER MB POWER THERMAL-COAL 120000 345632 38310
ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 754922 28671
ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 780761 23495
ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 198000 1263784 32090
ADANI POWER MAHARA ADANI POWER LTD THERMAL-COAL 330000 1666191 34124
AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 170065 36827
SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 252035 45129
ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 458551 36000
ESSAR POWER MP LTD ESSAR POWER MP LTD THERMAL-COAL 60000 243040 28600
VEDANTA LTD (P P -I) VEDANTA LTD THERMAL-GAS 3000 15044 24000
VEDANTA LTD (P P -II) VEDANTA LTD THERMAL-GAS 3000 21293 24000
PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 8234600 24000
165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 5850 64390
145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 68717 40349
SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 132655 28776
SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 144686 38567
MUNDRA UMPPCOASTAL GUJARAT POWER
LTD THERMAL-IMP COAL 400000 2530300
23900
LANCO AMARKANTAK TPP PATHADIH
U-ILANCO AMARKAN POWER LTD THERMAL-COAL 30000 195500
29200
LANCO AMARKANTAK TPP PATHADIH
U-IILANCO AMARKAN POWER LTD THERMAL-COAL 30000 206900
27600
BARADARHA TPS D B POWER LTD THERMAL-COAL 120000 677373 29200
JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 405000 28900
JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 453000 40500
DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 339437 40700
TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 293400 44000
TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 137200 37000
TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 174900 44000
BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 92900 14100
BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23700 34300
KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 27600 48300
CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2530300 23900
BHANDARDRA HEP -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 2475 54900
SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 161400 26500
SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 445000 39000
SOTHERN REGION
CENTRAL SECTOR
NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 325699 54820
NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 305532 39880
NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 998805 38510
NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 113016 54070
NEYVELI TAMILNADU POWER LTD JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 625274 42200
VALLUR TPS NTPC TECL THERMAL-COAL 150000 856438 42350
R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 1493 84300
RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1502919 29400
RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 341291 31800
SIMHADRI I NTPC LTD THERMAL-COAL 100000 688382 36800
SIMHADRI II NTPC LTD THERMAL-COAL 100000 663657 43400
KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 593110 31324
MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 291625 21764
KKNPP-1 amp 2 NPCIL NUCLEAR-NUCLEAR 200000 572609 40948
MINICOY LAKSHADEEP THERMAL-DIESEL 340 770 29600
KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1097 29600
AMINI LAKSHADEEP THERMAL-DIESEL 265 509 29600
ANDROTT LAKSHADEEP THERMAL-DIESEL 219 524 29600
KALPENI LAKSHADEEP THERMAL-DIESEL 175 356 29600
AGATTI LAKSHADEEP THERMAL-DIESEL 195 658 29600
KADMAT LAKSHADEEP THERMAL-DIESEL 190 414 29600
KILTAN LAKSHADEEP THERMAL-DIESEL 150 269 29600
CHETLET LAKSHADEEP THERMAL-DIESEL 100 139 29600
BITRA LAKSHADEEP THERMAL-DIESEL 043 024 29600
BANGARAM LAKSHADEEP THERMAL-DIESEL 018 009 29600
Page 37
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) STATE SECTOR
Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 721811 46500
Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 50000 336142 46500
RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 237358 46500
RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 239926 46500
RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 124500 46500
SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 62109 46500
UPPER SILERU APGENCO HYDRO-HYDRO 24000 33000 46500
LOWER SILERU APGENCO HYDRO-HYDRO 46000 81066 46500
DONKARAI APGENCO HYDRO-HYDRO 2500 6007 46500
PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 1262 46500
CHETTIPETA APGENCO HYDRO-HYDRO 100 214 46500
MUCHKUND APGENCO HYDRO-HYDRO 12000 37571 46500
NAGARJUNASAGAR RCPH APGENCO HYDRO-HYDRO 9000 606 46500
TUNGABHADRA HES amp HAMPI(AP
Share)
APGENCO HYDRO-HYDRO 7200 6100 46500
KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 352232 42600
KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 288131 32500
KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 319272 46500
RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 40073 44300
KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 308317 46000
KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 308963 51300
SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 61004 76600
NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 17960 75300
PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 20873 58300
POCHAMPAD-I TSPGENCO HYDRO-HYDRO 2700 5455 29800
POCHAMPAD-II TSPGENCO HYDRO-HYDRO 900 1932 40700
NIZAMSAGAR TSPGENCO HYDRO-HYDRO 1000 1126 53400
RAICHUR TPS 1 to 7 KPCL THERMAL-COAL 147000 890866 43800
RAICHUR TPS 8 KPCL THERMAL-COAL 25000 159523 48200
BELLARI TPS 1 KPCL THERMAL-COAL 50000 318679 51100
BELLARI TPS 2 KPCL THERMAL-COAL 50000 232347 55600
BELLARI TPS 3 KPCL THERMAL-COAL 70000 47565 34400
BHADRA PH KPCL HYDRO-HYDRO 3920 2369 45900
GERUSUPPA PH KPCL HYDRO-HYDRO 24000 26990 22000
GHAT PRABHA HEP KPCL HYDRO-HYDRO 3200 4777 25300
KADRA HPS KPCL HYDRO-HYDRO 15000 16889 26800
NAGJHARI KPCL HYDRO-HYDRO 90000 155159 9800
KODASALLI DPH KPCL HYDRO-HYDRO 12000 14854 19200
MUNIRA+MGH+SPH+SPH KPCL HYDRO-HYDRO 22640 48211 7900
SHARAVATHY HPS KPCL HYDRO-HYDRO 108550 276215 5400
ALMATTI DPH KPCL HYDRO-HYDRO 29000 39611 24600
VARAHI UGPH KPCL HYDRO-HYDRO 46000 71368 15600
IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 17196 15300
IDUKKI HPS KSEB HYDRO-HYDRO 78000 137905 15300
KAKKAD HPS KSEB HYDRO-HYDRO 5000 13063 15300
KALLADA HPS KSEB HYDRO-HYDRO 1500 4436 15300
KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 46544 15300
KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 635 15300
LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 30822 15300
MALANKARA HPS KSEB HYDRO-HYDRO 1050 2474 15300
MATTUPETTY KSEB HYDRO-HYDRO 200 230 15300
MALAMPUZHA KSEB HYDRO-HYDRO 250 063 15300
CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 864 15300
URUMI ST I amp II KSEB HYDRO-HYDRO 615 903 15300
LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 248 15300
NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7765 19625 15300
PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 16601 15300
PANNIAR HPS KSEB HYDRO-HYDRO 3240 6217 15300
PORINGALKUTHU KSEB HYDRO-HYDRO 3600 10052 15300
PORINGALKUTHU LBE KSEB HYDRO-HYDRO 1600 9438 15300
PEPPARA KSEB HYDRO-HYDRO 300 395 15300
POOZHITHODE KSEB HYDRO-HYDRO 480 1045 15300
Page 38
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) PEECHI KSEB HYDRO-HYDRO 125 040 15300
RANI-PERUNADU KSEB HYDRO-HYDRO 400 585 15300
SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 79783 15300
SENGULAM HPS KSEB HYDRO-HYDRO 5120 11558 15300
SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 16711 15300
VILANGAD KSEB HYDRO-HYDRO 750 1578 15300
BARAPOLE KSEB HYDRO-HYDRO 1500 1932 15300
VELLATHOOVAL KSEB HYDRO-HYDRO 360 305 15300
CHIM0NY KSEB HYDRO-HYDRO 250 156 15300
ADYANPARA KSEB HYDRO-HYDRO 350 501 15300
BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 554 15300
KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 3801 15300
KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 23132 32800
ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 14416 62280
METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 523970 62280
METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 321270 62280
NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 336575 62280
NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 591240 62280
TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 508966 62280
KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 30897 62280
VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 18720 90699 62280
KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 33593 62280
BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 1047 62280
PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 1250 62280
PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 330 62280
MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 4897 62280
MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 032 62280
KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15681 62280
KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 40608 62280
KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 21342 62280
KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 4717 62280
KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4322 62280
KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2399 62280
METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 4416 62280
METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 8035 62280
BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2187 62280
BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2359 62280
BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2511 62280
BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 1949 62280
BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 1819 62280
POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 172 62280
SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 241 62280
MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 026 62280
THIRUMOORTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 136 62280
PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 9309 62280
VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 353 62280
SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 4192 62280
PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 6571 62280
SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 1186 62280
SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6319 62280
ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 6122 62280
KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 28674 62280
SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 18381 62280
SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 4258 62280
KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 12680 62280
KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4201 62280
ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 000 62280
PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 19175 62280
AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 078 62280
BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 504 62280
BHAVANI KATTALAI (BKB)(IIIampIII BB I amp II)TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 5847 62280
PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 000 62280
Page 39
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) SRI DAMODARAM STPS APPDCL THERMAL-COAL 160000 808108 36300
PRIVATE SECTOR
KARUPPUR TANJORE LANCO TANJORE PCL THERMAL-GAS 12000 48096 28770
SIMHAPURI ENERGY LTD SIMHAPURI ENERGY LTD THERMAL-COAL 60000 143900 39100
JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 7111 45500
SBU 1 JSW ENERGY LTD
VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 26000 159100
43300
SBU 2 JSW ENERGY LTD
VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 60000 247900
42800
LANCO KPLLANCO KONDAPALLI POWER
LTDTHERMAL-GAS 36814 85060
25776
LANCO KPL STG -IILANCO KONDAPALLI POWER
LTDTHERMAL-GAS 36600 12979
46330
LANCO KPL STG -IIIALANCO KONDAPALLI POWER
LTDTHERMAL-GAS 37100 85710
46330
LANCO KPL STG -III BLANCO KONDAPALLI POWER
LTDTHERMAL-GAS 37100 43639
46330
HINDUJA NATIONAL PCL HINDUJA NATIONAL PCL THERMAL-COAL 104000 303000 38200
MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 121164 49940
UDUPI POWER COR LTD ADANI POWER LTD THERMAL-COAL 120000 754613 42500
SPECTRUM POWER GENERATION
LTD SPECTRUM PG LTD THERMAL-GASN 20525 9256812
34952
TAQA NEYVELI POWER COM PVT
LTD TAQA NEYVELI THERMAL-LIG 25000 5840
34500
ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 251000 51000
ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 207860 36800
GMR VEMAGIRI POWER GENERATION
LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 30117
46450
EASTERN REGION
CENTRAL SECTOR
MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 64675 53113
MTPS STAGE - II KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 39000 1432 69138
BOKARO `B` TPS DVC THERMAL-COAL 63000 145670 31539
MEJIA TPS U 1-3 DVC THERMAL-COAL 63000 348298 31552
MEJIA TPS U 4 DVC THERMAL-COAL 21000 116099 34997
MEJIA TPS U 5-6 DVC THERMAL-COAL 50000 276427 35976
MEJIA TPS U 7-8 DVC THERMAL-COAL 100000 552854 36991
DURGAPUR STEEL TPS DVC THERMAL-COAL 100000 665550 39323
DURGAPUR TPS DVC THERMAL-COAL 21000 59270 35416
RAGHUNATHPUR TPS DVC THERMAL-COAL 120000 201650 35326
MAITHON HYDEL STA DVC HYDRO-HYDRO 6320 12200 17984
CHANDRAPURA TPSU1-3 DVC THERMAL-COAL 42000 257610 35095
CHANDRAPURA TPSU7-8 DVC THERMAL-COAL 50000 306673 34987
KODERMA TPS DVC THERMAL-COAL 100000 380180 38131
PANCHET HPS DVC HYDRO-HYDRO 8000 13360 17984
TILLAYA HPS DVC HYDRO-HYDRO 400 1410 17984
RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34700 35400
TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 277300 23200
TLDP -III NHPC LTD HYDRO-HYDRO 13200 55400 62000
TLDP -IV NHPC LTD HYDRO-HYDRO 16000 60300 25600
FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 957219 33700
FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 308943 41000
BONGAINGAON TPS NTPC LTD THERMAL-COAL 25000 153663 58600
KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 542277 34200
KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 942591 34200
BARH-II NTPC LTD THERMAL-COAL 132000 728021 44500
TALCHER TPS NTPC LTD THERMAL-COAL 46000 335521 30100
TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 702319 25600
TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1436521 24700
STATE SECTOR
BTPS(RampM) BIHAR STATE PGCL THERMAL-COAL 22000 12142 39700
BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 98331 10602
HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 50593 9482
CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 19689 2605
RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 53192 6033
UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 147208 14637
Page 40
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 60353 4519
IB TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 288567 25000
J P H GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 210 038 61100
MEYONG CHU GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 400 1086 61100
TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 122667 38200
DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 214339 43321
KOLAGHAT THERMAL POWER
STATION
WEST BENGAL PDCL THERMAL-COAL 126000 538269 31603
BAKRESHWAR THERMAL POWER
PLANT
WEST BENGAL PDCL THERMAL-COAL 105000 634876 32154
BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 45000 166855 33299
SANTHALDIH THERMAL POWER
STATION
WEST BENGAL PDCL THERMAL-COAL 50000 336442 34932
SAGARDIGHI THERMAL POWER
PROJECT
WEST BENGAL PDCL THERMAL-COAL 160000 423121 34705
JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 20344 68900
RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 24559 68900
TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 4623 68900
PURULIA PUMPED STORAGE
PROJECT
WEST BENGAL SEDCL HYDRO-HYDRO 90000 108816 68900
MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2768 68900
PRIVATE SECTOR
CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 49474 20230
CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 555500 70200
HALDIA ENERGY HALDIA ENERGY LTD THERMAL-COAL 60000 371000 50400
DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3688 63400
KAMALANGA TPS GMR KAMALANGA ENERGY LTD THERMAL-COAL 105000547670
33300
ADHUNIK POWER U-1 ADHUNIK POWER THERMAL-COAL 27000 158 44060
ADHUNIK POWER U-2 ADHUNIK POWER THERMAL-COAL 27000 168 44250
VL-JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 332800 23622
JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 43000 45250
JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 71700 37030
JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 70700 35920
JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 71100 38870
JOJOBERA UNIT 5 TATA POWER COM LTD THERMAL-COAL 12000 79300 44560
JOJOBERA UNIT 6 TATA POWER COM LTD THERMAL-WHR 12000 83700 12840
IEL KALINGANAGAR U-I TATA POWER COM LTD THERMAL-WG 6750 33400 22500
IEL KALINGANAGAR U-II TATA POWER COM LTD THERMAL-WG 6750 34800 22500
MAITHON UNIT 1 amp 2 TATA POWER COM LTD THERMAL-COAL 105000 678000 36100
HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 27500 24340
HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 28400 24340
HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 15800 24310
NORTH EASTERN REGION
CENTRAL SECTOR
LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 74100 36600
AGARTALA GT NEEPCO THERMAL-GAS 13500 88611 27210
ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 153111 32310
DOYANG HEP NEEPCO HYDRO-HYDRO 7500 25598 49801
KOPILI HEP NEEPCO HYDRO-HYDRO 20000 98186 11491
KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 19582 20237
KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 10310 17968
RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 124093 22945
TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 10100 17344 39000
STATE SECTOR
HYDRO POWER (122 Stns) ITANAGAR GOVT OF ARUNACHAL
PRADESHHYDRO-HYDRO 6971 6217270
24600
KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39514 17337
LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 82327 36810
NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 33318 48290
MYNTRIANG SHEP ST II ASSAM POWER GENCO HYDRO-HYDRO 300 567 35776
LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 9130 49200
LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 012 49200
DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 022 49200
TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 000 49200
UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 4990 16000
UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 6476 37000
UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 16494 14600
UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 3600 9556 15000
SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 758 8000
MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44070 44800
KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 154 41400
TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 091 41400
MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 411 41400
MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 394 41400
KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 760 41400
SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 3264 41400
LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 044 41400
BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 18953 28000
ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 43585 28200
GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 4080 11100
Note
LIG Lignite N Naptha WHR Waste Heat Recovery
Page 41
File NoCEA-CH-14-1142018-Coordination Division
(As on 31102018)
Coal Gas Diesel Total
State 000 000 4005 4005 000 000 525 4530
Private 000 000 000 000 000 000 146 146
Central 000 000 000 000 000 000 510 510
Sub-Total 000 000 4005 4005 000 000 1181 5186
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 075 075
Central 000 000 000 000 000 000 000 000
Sub-Total 000 000 000 000 000 000 075 075
State 000 000 4005 4005 000 000 525 4530
Private 000 000 000 000 000 000 221 221
Central 000 000 000 000 000 000 510 510
Grand Total 000 000 4005 4005 000 000 1256 5261
19
Andaman amp
Nicobar
lakshadweep
Total (Islands)
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
State Ownership Sector
Modewise breakup
Grand TotalThermalNuclear
Hydro
(Renewable)
RES
(MNRE)
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
ISLANDS
File NoCEA-CH-14-1142018-Coordination Division
SrNo Contents Page
1 Executive summary of Target and Achievement of Transmission Lines during 2018-19
20(1)
2 List of Transmission Lines CommissionedReady for commissioning during Oct-2018 20(2)
Section C - Transmission Lines
File NoCEA-CH-14-1142018-Coordination Division
Executive summary of Target and Achievement of Transmission Lines during 2018-19 As on Oct-18
(All figures in circuit kms)
Centr
al S
ecto
r
Sta
te S
ecto
r
JV
Private
Secto
r
To
tal
Centr
al S
ecto
r
Sta
te S
ecto
r
JV
Private
Secto
r
To
tal
Centr
al S
ecto
r
Sta
te S
ecto
r
JV
Private
Secto
r
To
tal
Centr
al S
ecto
r
Sta
te S
ecto
r
JV
Private
Secto
r
To
tal
Centr
al S
ecto
r
Sta
te S
ecto
r
JV
Private
Secto
r
To
tal
Cen
tral S
ecto
r
Sta
te S
ecto
r
JV
Pri
vate
Secto
r
Gra
nd
To
tal
0 0 0 0 0 0 0 0 4692 766 827 6285 3045 5906 980 9931 553 5878 0 6431 8290 12550 1807 22647
Oct18 Programme 0 0 0 0 0 0 0 0 300 0 0 300 662 90 562 1314 0 723 0 723 962 813 562 2337
Achievement 0 0 0 0 0 0 0 0 729 0 0 729 471 266 0 737 0 401 0 401 1200 667 0 1867
Upto Oct-18 Programme 0 0 0 0 0 0 0 0 3004 416 0 3420 1350 3109 562 5021 481 4346 0 4827 4835 7871 562 13268
Achievement 0 0 0 0 0 0 0 0 2286 0 178 2464 1436 1783 1595 4814 60 4461 0 4521 3782 6244 1773 11799
20(1)
220 kV Grand Total 800 kV 500 kV
Programme 2018-19
Programme
Achievement
HVDC765 kV 400 kV
File NoCEA-CH-14-1142018-Coordination Division
SlNo Line
Length
(cKM)
1 2 3 4 5 6
1 765 Jharsuguda - Dharamjaygarh line DC PGCIL 296
2 765LILO of Kurnool - Thirvualam line at
CuddapahDC PGCIL 190
3 765 Salem PS - Madhugiri PS line SC PGCIL 243
4 400 Cuddapah - Hindupur line (Q) DC PGCIL 338
5 400LILO of Both Ckt of Bamnauli - Samaypur at
TughlakabadMC PGCIL 114
6 400LILO-Out of Cuddapah - Hindupur line (Q)
(Both Ckts) at NP Kunta ssDC PGCIL 19
1200
7 400LILO of Sterlite - Meramundali at Lapanga
4oo kV ssDC OPTCL 14
8 400 Sterlite - Lapanga line DC OPTCL 37
9 400 TMDC Podili - Sattapenalli line DC APTRANSCO 215
10 230Neyveli 230110 kV ss - Eachangadu
230kV FeederSC TANTRANSCO 1
11 230 NNTPS - Neyveli 230110kV ss DC TANTRANSCO 2
12 220 Ajmer (400 kV) - Bherunda (TK) DC RVPNL 100
13 220 Aligarh - Atrauli line DC UPPTCL 77
14 220 Khandwa - Chhanera line DC MPPTCL 78
15 220LILO of one Ckt of Hadala - Sartanpar line
at Wankaner on MC towersDC GETCO 6
16 220 LILO of one Ckt of Vita - Miraj at Alkud ss DC MSETCL 27
17 220 Mendhigiri - Alkud ss DC MSETCL 110
667
1867
20(2)
Grand Total
2Transmission Lines (220 kV and above) CommissionedReady for commissioning During Oct-2018
As on 31-10-18
Voltage
Level (kV)Name of Transmission Lines
Circuit
Type
Executing
Agency
CENTRAL SECTOR
Total of CENTRAL SECTOR
STATE SECTOR Sector
Total of STATE SECTOR
File NoCEA-CH-14-1142018-Coordination Division
SN Contents Page
1 Executive summary of Target and Achievement of Substations during 2018-19 21(1)
2Sub Stations (220 kV and above) commissionedready for commisssioning during Oct-
201821(2)
Section D - Sub Stations
File NoCEA-CH-14-1142018-Coordination Division
1 Executive summary of Target and Achievement of Substations during 2018-19 As on Oct-18
(All figures in circuit MVA)
Centr
al S
ecto
r
Sta
te S
ecto
r
JV
Private
Secto
r
To
tal
Centr
al S
ecto
r
Sta
te S
ecto
r
JV
Private
Secto
r
To
tal
Centr
al S
ecto
r
Sta
te S
ecto
r
JV
Private
Secto
r
To
tal
Centr
al S
ecto
r
Sta
te S
ecto
r
JV
Private
Secto
r
To
tal
Centr
al S
ecto
r
Sta
te S
ecto
r
JV
Private
Secto
r
To
tal
Cen
tral S
ecto
r
Sta
te S
ecto
r
JV
Pri
vate
Secto
r
Gra
nd
To
tal
3000 0 0 3000 0 0 0 0 22200 0 0 22200 8185 13085 630 21900 740 14760 0 15500 34125 27845 630 62600
Oct18 Programme 0 0 0 0 0 0 0 0 0 0 0 0 1000 1260 630 2890 0 1400 0 1400 1000 2660 630 4290
Achievement 0 0 0 0 0 0 0 0 3000 0 0 3000 1500 3120 0 4620 0 2220 0 2220 4500 5340 0 9840
Upto Oct-18 Programme 0 0 0 0 0 0 0 0 10000 0 0 10000 6130 7435 630 14195 0 9670 0 9670 16130 17105 630 33865
Achievement 0 0 0 0 0 0 0 0 14000 0 0 14000 9000 7550 630 17180 0 10610 0 10610 23000 18160 630 41790
21(1)
220 kV Grand Total 800 kV 500 kV
Programme 2018-19
Programme
Achievement
HVDC765 kV 400 kV
File NoCEA-CH-14-1142018-Coordination Division
As on 31-10-18
Sl Voltage Ratio Capacity
No (kVkV) (MWMVA)
1 2 3 4 5
1 Cuddapah Ss 765400 PGCIL 3000
2 Tughlakabad SS (GIS) 400220 PGCIL 1500
Total of CENTRAL SECTOR 4500
3 Panki Kanpur (Aug) TF-I 400200 UPPTCL 75
4 Hindupur ss (1st ICT) 400220 APTRANSCO 315
5 Thappagundu ss 400110 TANTRANSCO 600
6 Mendhasal (2nd power TF) 400220 OPTCL 20
7 Jodhpur ss (New) 400220 RVPNL 315
8 Shankarpally 400220 TSTRANSCO 500
9 Podili ss (1st ICT) 400220 APTRANSCO 315
10 Doni (Gadag)SS 400220 KPTCL 1000
11 Porur (Addl TF) 230110 TANTRANSCO 100
12 Anuppankulam (Addl TF) 230110 TANTRANSCO 60
13 Neyveli SS 230110 TANTRANSCO 480
14 Savarkundla (Aug) 22066 GETCO 60
15 Bhuna (Aug) 220132 HVPNL 100
16 Madanpur (Aug) 22066 HVPNL 100
17 Gurgaon Sec-52A (Aug) 22066 HVPNL 160
18 IA Hisar (Aug) 220132 HVPNL 50
19 Narwana (Aug) 220132 HVPNL 60
20 Therubali (3rd Auto TF) 220132 OPTCL 160
21 Halasar ss 220132 RVPNL 160
22 Bansi Siddaharthnagar (Aug) TF-I 220132 UPPTCL 60
23 Hata Kushinagar (New) TF-I 220132 UPPTCL 100
24 Gomti nagar Lucknow (Aug) TF-IV 22033 UPPTCL 60
25 Kanpur Road Lucknow (New) TF-III 22033 UPPTCL 60
26 Asoj (Aug) 22066 GETCO 150
27 Kangasiyali (Aug) 22066 GETCO 60
28 Karmsad (Aug) 22066 GETCO 160
29 Lalpar (Aug) 22066 GETCO 60
TOTAL STATE SECTOR 5340
GRAND TOTAL 9840
21(2)
PRIVATE SECTOR
CENTRAL SECTOR
STATE SECTOR
2Sub-Stations (220 kV and above) CommissionedReady for commissioning During Oct-2018
Name of Sub StationsExecuting
Agency
File NoCEA-CH-14-1142018-Coordination Division
SN Contents Page
1 Electricity Generation (MU) Targets and Achievements for 2018-19 22
Section E - Electricity Generation
File NoCEA-CH-14-1142018-Coordination Division
Programme Achievement Ach Programme Achievement Ach
Central Sector 35160700 3028100 3162321 10443 20144400 21150469 10499
State Sector 35132000 3010000 3017260 10024 19922100 19549030 9813
PvtIPP Sector 36999700 3240600 3375603 10417 21598300 20794155 9628
PvtUTL Sector 1857600 164500 180597 10979 1130900 1203107 10638
Total 109150000 9443200 9735781 10310 62795700 62696761 9984
Central Sector 5617600 420900 451004 10715 4193000 4045436 9648
State Sector 6110600 559500 708469 12663 4049400 4433000 10947
PvtIPP Sector 1141800 80500 90122 11195 976400 1021963 10467
PvtUTL Sector 130000 11300 12564 11119 76700 99943 13030
Total 13000000 1072200 1262159 11772 9295500 9600342 10328
Central Sector 3850000 353300 303310 8585 2068900 2203540 10651
Total 3850000 353300 303310 8585 2068900 2203540 10651
Bhutan Import 500000 63300 35395 5592 347000 416660 12007
Central Sector 44628300 3802300 3916635 10301 26406300 27399445 10376
State Sector 41242600 3569500 3725729 10438 23971500 23982030 10004
Pvt Sector 40129100 3496900 3658886 10463 23782300 23119168 9721
Total 126500000 10932000 11336645 10370 74507100 74917303 10055
Provisional based on actual-cum-Assesment
Figs in MU
Cummulative
Achievement
Cummulative
Achievement
Sep-18 Sep-17 Upto Sep-2018 Upto Sep-2017
1073794 748889 7332680 5660929
22
Renewable Energy Generation
Achievement
Oct-2018
1 Electricity Generation (MU) Targets and Achievememts for 2018-19
All India Energy Generation During April 2018- Oct 2018 (MU)
Target (2018-19)April 2018- Oct 2018
Sector
Hydro
Thermal
Nuclear
627957
92955
20689
745071
626968
96003
22035
749173
0
100000
200000
300000
400000
500000
600000
700000
800000
Thermal Hydro Nuclear Total
Programme
Achievement
File NoCEA-CH-14-1142018-Coordination Division
SN Contents Page
1 Energy Power Supply Position (Provisional) for Oct-2018 and during April 2018- Oct 2018 23
2 Peak Power Supply Position (Provisional) for Oct-2018 and during April 2018- Oct 2018 24
3 Energy Power Supply Position (Revised) for Sep-2018 and during April 2018- Sept 2018 25
4 Peak Power Supply Position (Revised) for Sep-2018 and during April 2018- Sept 2018 26
5 Notified Power cuts Restrictions on Industries during Oct-2018 27
6 Power Supply to Agricultural Sector during Oct-2018 28
Section F - Power supply position
File NoCEA-CH-14-1142018-Coordination Division
आकड़ मममलयन यननट नट Figures in MU net
ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied
कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )
चडीगढ़ Chandigarh 108 108 0 00 1055 1055 0 00
दिलली Delhi 2490 2489 1 00 22524 22510 14 01
हरियजणज Haryana 4554 4554 0 00 35205 35205 0 00
दहमजचल परिश Himachal Pradesh 788 787 2 02 5728 5560 168 29
रमम कशमीि Jammu amp Kashmir 1497 1219 278 186 10982 8865 2117 193
परजब Punjab 4418 4418 0 00 38832 38819 13 00
िजरसथजन Rajasthan 6748 6748 0 00 45341 45181 160 04
उतति परिश Uttar Pradesh 10136 9973 164 16 75485 74808 676 09
उततिजखड Uttarakhand 1083 1081 3 03 8395 8310 85 10
उततरी कषतर Northern Region 31822 31375 447 14 243547 240314 3233 13
छततीसगढ़ Chhattisgarh 2454 2453 1 00 16119 16091 28 02
गरिजत Gujarat 11636 11636 0 00 70782 70768 14 00
मधय परिश Madhya Pradesh 5860 5859 1 00 38412 38410 2 00
महजिजषटर Maharashtra 15223 15095 128 08 95489 95355 134 01
िमन औि दिउ Daman amp Diu 216 216 0 00 1523 1523 0 00
िजिि व नगि हवली Dadra amp Nagar Haveli 553 553 0 00 3757 3757 0 00
गोवज Goa 366 366 0 00 2497 2495 2 01
पशचिमी कषतर Western Region 36308 36178 130 04 228579 228398 180 01
आनधर परिश Andhra Pradesh 5860 5854 6 01 37377 37334 43 01
तलगजनज Telangana 6748 6742 6 01 38251 38205 46 01
कनजाटक Karnataka 5842 5835 7 01 39111 39059 52 01
किल Kerala 2116 2096 20 09 14256 14160 96 07
तममल नजड Tamil Nadu 8611 8601 10 01 65742 65666 76 01
पडचिी Puducherry 216 215 1 05 1654 1646 8 05
लकष-दवीप Lakshadweep 4 4 0 0 27 27 0 0
दकषकषणी कषतर Southern Region 29392 29342 50 02 196390 196069 321 02
बबहजि Bihar 2742 2738 4 01 19143 18951 192 10
िजमोिि घजटी ननगम DVC 1712 1698 13 08 13096 12828 268 20
झजिखणड Jharkhand 701 697 4 06 5022 4949 73 15
ओडडशज Odisha 3147 3134 13 04 20224 20192 32 02
पशशचम बगजल West Bengal 4204 4200 4 01 33008 32881 127 04
मसशककम Sikkim 40 40 0 00 279 279 0 01
अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 67 202 188 13 67
परवी कषतर Eastern Region 12547 12507 40 03 90772 90080 692 08
अरणजचल परिश Arunachal Pradesh 67 66 1 09 502 496 7 13
असम Assam 833 809 24 29 6153 5903 250 41
मणणपि Manipur 72 71 1 10 485 478 7 14
मघजलय Meghalaya 147 147 0 00 1043 1042 0 00
ममज़ोिम Mizoram 63 62 1 08 365 359 5 14
नजगजलड Nagaland 76 67 8 110 540 481 59 109
बिपिज Tripura 130 129 1 09 1025 1007 19 18
उततर-परवी कषतर North-Eastern Region 1387 1351 35 25 10113 9766 346 34
समपणण भारत All India 111455 110753 702 06 769399 764627 4773 06
23
ऊराण वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Energy Power Supply Position Report (Provisional)
राजयStateअकरबर2018 October2018 अपरल2018 -अकरबर2018 April2018 to October2018
ऊरजा पनत ा म कमी ऊरजा पनत ा म कमीEnergy not Supplied
Excludes energy exported to Bangladesh
Energy not Supplied
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
File NoCEA-CH-14-1142018-Coordination Division
अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met
कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )
चडीगढ़ Chandigarh 217 217 0 00 369 369 0 00
दिलली Delhi 4713 4713 0 00 7016 7016 0 00
हरियजणज Haryana 7948 7948 0 00 10270 10270 0 00
दहमजचल परिश Himachal Pradesh 1520 1520 0 00 1520 1520 0 00
रमम कशमीि Jammu amp Kashmir 2836 2269 567 200 2951 2361 590 200
परजब Punjab 7979 7979 0 00 12638 12638 0 00
िजरसथजन Rajasthan 11450 11450 0 00 11698 11698 0 00
उतति परिश Uttar Pradesh 17434 16745 688 39 20498 20062 436 21
उततिजखड Uttarakhand 1943 1943 0 00 2143 2143 0 00
उततरी कषतर Northern Region 50659 49635 1024 20 63166 61726 1440 23
छततीसगढ़ Chhattisgarh 4414 4268 146 33 4414 4268 146 33
गरिजत Gujarat 18148 18130 19 01 18148 18130 19 01
मधय परिश Madhya Pradesh 11356 11317 39 03 11356 11317 39 03
महजिजषटर Maharashtra 23864 23159 705 30 23864 23254 610 26
िमन औि दिउ Daman amp Diu 342 341 1 02 357 356 1 02
िजिि व नगि हवली Dadra amp Nagar Haveli 784 780 4 05 816 815 1 01
गोवज Goa 536 536 0 00 596 596 0 00
पशचिमी कषतर Western Region 56548 55695 853 15 56548 55695 853 15
आनधर परिश Andhra Pradesh 9435 9435 0 00 9435 9435 0 00
तलगजनज Telangana 10603 10603 0 00 10815 10815 0 00
कनजाटक Karnataka 10741 10741 0 00 10741 10741 0 00
किल Kerala 3727 3644 83 22 4050 3997 53 13
तममल नजड Tamil Nadu 14747 14333 414 28 15029 14981 47 03
पडचिी Puducherry 363 362 1 03 420 400 19 46
लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0
दकषकषणी कषतर Southern Region 45279 45226 53 01 45946 45684 262 06
बबहजि Bihar 4945 4945 0 00 5050 5045 5 01
िजमोिि घजटी ननगम DVC 2729 2729 0 00 2874 2874 0 00
झजिखणड Jharkhand 1260 1260 0 00 1339 1284 55 41
ओडडशज Odisha 5624 5224 400 71 5624 5357 268 48
पशशचम बगजल West Bengal 8775 8775 0 00 9130 9123 7 01
मसशककम Sikkim 86 86 0 00 90 90 0 00
अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7
परवी कषतर Eastern Region 22959 22567 392 17 22959 22567 392 17
अरणजचल परिश Arunachal Pradesh 138 125 13 94 138 133 5 37
असम Assam 1785 1704 81 45 1865 1809 56 30
मणणपि Manipur 187 185 2 11 193 186 7 36
मघजलय Meghalaya 336 336 0 00 371 368 2 07
ममज़ोिम Mizoram 99 97 2 20 103 98 4 41
नजगजलड Nagaland 134 131 3 22 156 138 18 117
बिपिज Tripura 269 269 0 00 298 293 5 17
उततर-परवी कषतर North-Eastern Region 2790 2700 90 32 2967 2850 117 39
समपणण भारत All India 172945 170604 2341 14 177022 175528 1494 08
24
अधिकतम वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Peak Power Supply Position Report (Provisional)
आकड़ मगज वजट नट Figures in MW netअपरल2018 -अकरबर2018 April2018 to October2018
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
मजग की पनता म कमी Demand not Met
Excludes the supply to Bangladesh
राजयStateअकरबर2018 October2018
मजग की पनता म कमी Demand not Met
File NoCEA-CH-14-1142018-Coordination Division
आकड़ मममलयन यननट नट Figures in MU net
ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied
कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )
चडीगढ़ Chandigarh 141 141 0 00 947 947 0 00
दिलली Delhi 2925 2924 1 00 20034 20021 13 01
हरियजणज Haryana 4794 4794 0 00 30651 30651 0 00
दहमजचल परिश Himachal Pradesh 876 853 24 27 4940 4773 167 34
रमम कशमीि Jammu amp Kashmir 1520 1246 274 180 9485 7646 1839 194
परजब Punjab 5575 5575 0 00 34414 34401 13 00
िजरसथजन Rajasthan 6202 6201 0 00 38594 38434 160 04
उतति परिश Uttar Pradesh 10211 10124 86 08 65349 64836 513 08
उततिजखड Uttarakhand 1162 1149 13 11 7311 7229 82 11
उततरी कषतर Northern Region 33405 33008 398 12 211725 208939 2786 13
छततीसगढ़ Chhattisgarh 2403 2388 15 06 13665 13638 27 02
गरिजत Gujarat 10122 10122 0 00 59146 59132 14 00
मधय परिश Madhya Pradesh 5492 5491 1 00 32552 32551 1 00
महजिजषटर Maharashtra 13615 13612 3 00 80266 80260 6 00
िमन औि दिउ Daman amp Diu 221 221 0 00 1306 1306 0 00
िजिि व नगि हवली Dadra amp Nagar Haveli 551 551 0 00 3204 3204 0 00
गोवज Goa 339 339 0 00 2131 2128 2 01
पशचिमी कषतर Western Region 32742 32723 19 01 192270 192220 50 00
आनधर परिश Andhra Pradesh 5294 5287 7 01 31518 31480 37 01
तलगजनज Telangana 6279 6272 8 01 31503 31463 40 01
कनजाटक Karnataka 5701 5693 8 01 33269 33225 45 01
किल Kerala 2050 2026 24 12 12140 12063 76 06
तममल नजड Tamil Nadu 8971 8959 12 01 57131 57065 66 01
पडचिी Puducherry 226 224 2 08 1438 1431 7 05
लकष-दवीप Lakshadweep 4 4 0 0 23 23 0 0
दकषकषणी कषतर Southern Region 28520 28460 60 02 166998 166727 271 02
बबहजि Bihar 2839 2793 46 16 16400 16213 188 11
िजमोिि घजटी ननगम DVC 1901 1750 151 79 11384 11130 254 22
झजिखणड Jharkhand 740 723 17 22 4321 4252 69 16
ओडडशज Odisha 2921 2918 3 01 17077 17058 19 01
पशशचम बगजल West Bengal 4902 4879 23 05 28804 28681 123 04
मसशककम Sikkim 39 39 0 01 239 239 0 01
अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 67 173 162 12 67
परवी कषतर Eastern Region 13341 13102 240 18 78225 77573 652 08
अरणजचल परिश Arunachal Pradesh 74 73 1 10 435 429 6 14
असम Assam 950 914 36 38 5320 5094 226 43
मणणपि Manipur 70 69 1 11 414 408 6 15
मघजलय Meghalaya 150 150 0 01 896 896 0 01
ममज़ोिम Mizoram 58 57 1 12 302 297 5 16
नजगजलड Nagaland 80 72 8 104 464 414 50 108
बिपिज Tripura 192 191 1 07 895 878 17 19
उततर-परवी कषतर North-Eastern Region 1575 1527 48 31 8726 8415 311 36
समपणण भारत All India 109584 108819 765 07 657944 653873 4071 06
Energy not Supplied Energy not Supplied
ससतबर2018 September2018 अपरल2018 -ससतबर2018 April2018 to September2018
ऊरजा पनत ा म कमी ऊरजा पनत ा म कमी
Excludes energy exported to Bangladesh
राजयState
ऊराण वरवदयत आपरतण शथिरत ररपोरण (सशोधित) Energy Power Supply Position Report (Revised)
25
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
File NoCEA-CH-14-1142018-Coordination Division
अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met
कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )
चडीगढ़ Chandigarh 293 293 0 00 369 369 0 00
दिलली Delhi 5358 5358 0 00 7016 7016 0 00
हरियजणज Haryana 9008 9008 0 00 10270 10270 0 00
दहमजचल परिश Himachal Pradesh 1466 1466 0 00 1479 1479 0 00
रमम कशमीि Jammu amp Kashmir 2951 2361 590 200 2951 2361 590 200
परजब Punjab 11405 11405 0 00 12638 12638 0 00
िजरसथजन Rajasthan 10612 10612 0 00 11698 11698 0 00
उतति परिश Uttar Pradesh 18346 18121 225 12 20498 20062 436 21
उततिजखड Uttarakhand 1996 1996 0 00 2143 2143 0 00
उततरी कषतर Northern Region 56407 55649 758 13 63166 61726 1440 23
छततीसगढ़ Chhattisgarh 4404 4075 328 75 4404 4136 268 61
गरिजत Gujarat 16963 16963 0 00 17053 16963 90 05
मधय परिश Madhya Pradesh 8811 8771 41 05 8811 8775 36 04
महजिजषटर Maharashtra 22455 22349 106 05 23395 23254 141 06
िमन औि दिउ Daman amp Diu 357 356 1 02 357 356 1 02
िजिि व नगि हवली Dadra amp Nagar Haveli 816 815 1 01 816 815 1 01
गोवज Goa 596 596 0 00 596 596 0 00
पशचिमी कषतर Western Region 52933 52895 38 01 53841 52895 945 18
आनधर परिश Andhra Pradesh 9435 9416 19 02 9435 9416 19 02
तलगजनज Telangana 10815 10815 0 00 10815 10815 0 00
कनजाटक Karnataka 10103 10090 13 01 10690 10688 2 00
किल Kerala 3888 3638 251 64 4050 3997 53 13
तममल नजड Tamil Nadu 14556 14553 3 00 15029 14981 47 03
पडचिी Puducherry 390 372 17 45 420 400 19 46
लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0
दकषकषणी कषतर Southern Region 45542 45428 114 02 45946 45684 262 06
बबहजि Bihar 5050 5045 5 01 5050 5045 5 01
िजमोिि घजटी ननगम DVC 2641 2641 0 00 2874 2874 0 00
झजिखणड Jharkhand 1233 1233 0 00 1339 1284 55 41
ओडडशज Odisha 4906 4906 0 00 5357 5357 0 00
पशशचम बगजल West Bengal 8644 8639 5 01 9130 9123 7 01
मसशककम Sikkim 78 78 0 00 90 90 0 00
अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7
परवी कषतर Eastern Region 22110 22100 10 00 22470 22290 180 08
अरणजचल परिश Arunachal Pradesh 132 130 2 15 138 133 5 37
असम Assam 1865 1809 56 30 1865 1809 56 30
मणणपि Manipur 184 182 2 13 193 186 7 36
मघजलय Meghalaya 317 317 0 00 371 368 2 07
ममज़ोिम Mizoram 95 93 2 23 103 98 4 41
नजगजलड Nagaland 142 138 5 32 156 138 18 117
बिपिज Tripura 296 293 3 10 298 293 5 17
उततर-परवी कषतर North-Eastern Region 2921 2850 71 24 2967 2850 117 39
समपणण भारत All India 177022 175528 1494 08 177022 175528 1494 08
26
मजग की पनता म कमी मजग की पनता म कमी Demand not MetDemand not Met
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
Excludes the supply to Bangladesh
अधिकतम वरवदयत आपरतण शथिरत ररपोरण (सशोधित) Peak Power Supply Position Report (Revised)
आकड़ मगज वजट नट Figures in MW net
राजयStateससतबर2018 September2018 अपरल2018 -ससतबर2018 April2018 to September2018
File NoCEA-CH-14-1142018-Coordination Division
अकरबर2018 October2018अपरल2018 -अकरबर2018 April2018 to October2018
उततरी कषतर Northern Region
चडीगढ़ Chandigarh Data not received Data not received
दिलली Delhi
हरियजणज Haryana
दहमजचल परिश Himachal Pradesh
रमम कशमीि Jammu amp Kashmir Data not received Data not received
परजब Punjab
िजरसथजन Rajasthanउतति परिश Uttar Pradesh
उततिजखड Uttarakhand
पशचिमी कषतर Western Region
छततीसगढ़ Chhattisgarh
गरिजत Gujarat
मधय परिश Madhya Pradesh
महजिजषटर Maharashtra
गोवज Goa
दकषकषणी कषतर Southern Region
आनधर परिश Andhra Pradesh
तलगजनज Telangana
कनजाटक Karnataka
किल Kerala
तममल नजड Tamil Nadu
पडचिी Puducherryपरवी कषतर Eastern Region
बबहजि Bihar
झजिखणड Jharkhand
ओडडशज Odisha
पशशचम बगजल West Bengal
N
o No
tified
Cuts
N
o No
tified
Cuts
27
अकरबर 2018 म इडथरीर पर वरवदयत करौती का वरवरवरण Notified Power CutsRestrictions on Industries during October2018
राजय कषतर State Regionऊराणमाग करौती EnergyDemand Cut
No Notified Cuts No Notified Cuts
File NoCEA-CH-14-1142018-Coordination Division
अकरबर2018 October2018अपरल2018 -अकरबर2018 April2018 to October2018
उततरी कषतर Northern Region
चडीगढ़ Chandigarh Data not received Data not received
दिलली Delhi Data not received Data not received
हरियजणज Haryana 940 hrsday 0709 - 0950 hrsday
दहमजचल परिश Himachal Pradesh No cut imposed on agriculture consumers and uninterrupted
power is being supplied to agriculture sector
HPSEBL has only 2 agriculture consumers and uninterrupted
power is being supplied to agriculture sector
रमम कशमीि Jammu amp Kashmir Data not received Data not received
परजब Punjab 0507 hrsday 0349 - 0844 hrsday
िजरसथजन Rajasthan 0630 hrsday 0630 hrsday
उतति परिश Uttar Pradesh 1825 hrsday 1814 - 1858 hrsday
उततिजखड Uttarakhand 2350 hrsday 2128 - 2357 hrsday
पशचिमी कषतर Western Region
छततीसगढ़ Chhattisgarh 18hoursday 18 hrsday
गरिजत Gujarat 805 hrsday 805 hrsday
मधय परिश Madhya Pradesh Three-Phase Supply(Irrigation)-947 hrs day
Three-Phase (Mixed) Supply - 2311 hrs day
Three-Phase Supply(Irrigation)- 0933 - 0947 hrs day Three-
Phase (Mixed) Supply - 2300 - 2320 hrs day
महजिजषटर Maharashtra Three-Phase Supply(Irrigation)- 9 hrs day
Three-Phase (Mixed) Supply - 24 hrs day
Three-Phase Supply(Irrigation)- 9 hrs day
Three-Phase (Mixed) Supply - 24 hrs day
गोवज Goa No restriction No restriction
दकषकषणी कषतर Southern Region
आनधर परिश Andhra Pradesh 07 hrsday 07 hrsday
तलगजनज Telangana 24 hoursday 24 hoursday
कनजाटक Karnataka 6 hrsday 6 hrsday
किल Kerala No Restrictions No Restrictions
तममल नजड Tamil Nadu 9 hrsday (6 hrs during day time and 3 hrs during night time) 9 hrsday (6 hrs during day time and 3 hrs during night time)
पडचिी Puducherry No Restrictions No Restrictions
परवी कषतर Eastern Region
बबहजि Bihar About 18 hrsday About 18 hrsday
झजिखणड Jharkhand About 20 hrsday About 20 hrsday
ओडडशज Odisha 24 hrsday 24 hrsday
पशशचम बगजल West Bengal About 23 hrsday About 23 hrsday
28
अकटबर 2018 कषि कषतर को षिदयत आपरति का षििरण Power Supply to Agricultural Sector during October2018
राजय कषतर State Regionऔसत वरवदयत आपरतण घनरो म Average Hours of Supply
On segregated feeders
File NoCEA-CH-14-1142018-Coordination Division
SNo Contents Page
1 Growth of Installed Capacity since 6th Plan 29
2 Progress of Transmission Sector since 6th Plan 30
3 All India Yearly Coal consumption for Power Generation (Utilities)
4 All India Annual Per Capita Consumption of Electricity since -2006
5 Average cost of power supply amp Average realisation (Paisakwh)
6 Growth of Rural Electrification amp Pump Sets Energisation
7 Status of Hydro Schemes Cleared by the CEA in Oct-2018
Section G - Growth of Power Sector
31
32
File NoCEA-CH-14-1142018-Coordination Division
(In MW)
Coal Gas Diesel Total
End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472
End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634
End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537
End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596
End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921
End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703
End of 12th Plan 19216288 2532938 83763 21832988 6780 4447842 50018 31960630
Up to Oct-2018 19599250 2493722 837629 22176734 6780 4548742 7201281 34604757
Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-17) = 51529 MW
Electricity Generation (MU) Targets and Achievements for 2016-17
Coal Gas Diesel Nuclear Hydro Res Total
1959925 2493722 837629 678000 454874 72012805 22925174
29
1 Growth of Installed Capacity Since 6th Plan
Plan YearThermal
Nuclear Hydro RES (MNRE) Total
Total Installed Capacity 34604757 MW
Coal Gas Diesel Nuclear Hydro Res
File NoCEA-CH-14-1142018-Coordination Division
Progress of Transmission Sector in the Country up to Oct 2018
1 TRANSMISSION LINES (All fig in CKM)
At the end of
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
6th plan 0 0 0 0 0 0 0 0 0 0 0 0 1831 4198 0 6029 1641 44364 0 46005 3472 48562 0 52034
7th plan 0 0 0 0 0 0 0 0 0 0 0 0 13068 6756 0 19824 4560 55071 0 59631 17628 61827 0 79455
8th plan 0 0 0 0 1634 0 0 1634 0 0 0 0 23001 13141 0 36142 6564 73036 0 79600 31199 86177 0 117376
9th plan 0 0 0 0 3234 1504 0 4738 751 409 0 1160 29345 20033 0 49378 8687 88306 0 96993 42017 110252 0 152269
10th plan 0 0 0 0 4368 1504 0 5872 1775 409 0 2184 48708 24730 0 73438 9444 105185 0 114629 64295 131828 0 196123
11th Plan 0 0 0 0 5948 1504 1980 9432 4839 411 0 5250 71023 30191 5605 106819 10140 125010 830 135980 91950 157116 8415 257481
12th Plan 6124 0 0 6124 5948 1504 1980 9432 25465 1177 4598 31240 92482 48240 17065 157787 11014 151276 978 163268 141033 202197 24621 367851
13th Plan (Up
to Mar2018)6124 0 0 6124 5948 1504 1980 9432 28666 1512 4881 35059 98247 54286 19067 171600 11258 156497 1000 168755 150243 213799 26928 390970
13th Plan (Up
to Sep-18)6124 0 0 6124 5948 1504 1980 9432 30952 1512 5059 37523 99683 56069 20662 176414 11318 160958 1000 173276 154025 220043 28701 402769
27150
75050
47900
118050
90650
30
IR addition in 12th Plan (up to
March 2017)
Total IR (up to Oct-18)
IR at the end of 11th Plan
IR at the end of 12th Plan
Envisaged IR Capacity at the end
of 13th Plan
Grand Total
Note - The figure upto the end of 10th plan in for stringing progress including the lines not commissioned Now only commissioned lines are reckoned Accordingly the figure for 10th plan (end) may read as 187555 after adjusting with (-) 10852 Ckm
Inter-regional Power Transfer Capacity
plusmn 800 kV HVDC plusmn 500 kV HVDC 765 kV 400 kV 220 kV
File NoCEA-CH-14-1142018-Coordination Division
2004-05 27800
2005-06 28100
2006-07 30200
2007-08 33000
2008-09 35500
2009-10 36700
2010-11 38700
2011-12 41756
2012-13 45460
2013-14 48940
2014-15 53040
2015-16 54590
2016-17 57430
2017-18 60800
Year
2005-06
2006-07
2007-08
2008-09
2009-10
2010-11
2011-12
2012-13
2013-14
2014-15
2015-16
2016-17
2017-18
2004-05 254 209 7568
2005-06 260 221 7636
2006-07 276 227 7423
2007-08 293 239 7727
2008-09 340 263 8713
2009-10 355 268 8870
2010-11 398 303 11975
2011-12 455 330 13514
2012-13 501 376 14867
2013-14 518 175
2014-15 520
6719
7171
3 All India yearly Coal Consumption for Power Generation (Utilities)
YEARCoal Consumption
Million Tonnes
4 All India Annual per Capita consumption of Electricity Since 2006
Per Capita Consumption ( kWh)
6314
(GrossGen+ Net Import) Mid-year population
5 Average cost of power supply amp average realization ( paiseKWH )
Yearcost of supply
(paiseunit)
Realization(paiseunit)
Including AgricultureOnly
Agriculture
1149
7335
7786
91441
8188
88363
957
1010
1075
1122
File NoCEA-CH-14-1142018-Coordination Division
Source- PFC Reports on the performance of State Power Utilities 31
File NoCEA-CH-14-1142018-Coordination Division
Sl
NoExecuting Agency
Installed
Capacity (MW)Cost (Rs crore)
Date of
Clearance
32
No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification
since 2004-05
65291374575 296361511th Plan
Cumu upto End of 11th Plan
596556 21212860
557439Cummulative up to end of 12th Plan
46708
18423975
499150
2003-042004-05
5743
9769
Cumu upto End of 10th Plan
010407 to 310308
010410 to 310311557976840909
010411 to 310312
412667
86293726
3207
482864
12632
1576036
4451722594
15455554
2314176
397343611750
2093311060316074
65109527813884
6 Growth Of Rural Electrification amp Pumpsets Energisation
Plan Year
9th Plan2002-03
134092626
4111
Pump Sets Energised Villages Electricfied (Nos)
2001-02
284064367244
1218
27801997-981998-991999-002000-01
297594
010408 to 310309010409 to 310310
10th Plan
2005-062006-07
322968331020
Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as
Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received
from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made
available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified
villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is
independent of the earlier published reports
No Hydro Electric Project has been issued concurrenceAppraisal letter by CEA during October 2018
7 Status of Hydro Schemes Cleared by the CEA in Oct-2018
Name of Scheme
File NoCEA-CH-14-1142018-Coordination Division
SN Contents Page
1 Rate of sale of power for the year 2016-17 33-41
RATE OF SALE OF POWER FOR THE YEAR 2016-17
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) NORTHERN REGION
CENTRAL SECTOR
BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 18000 66900 19800
CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 54000 222400 21600
CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 30000 144400 19600
CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 23100 91700 42600
PARBATI - III HPS NHPC LTD HYDRO-HYDRO 52000 68200 54800
DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 28000 95600 30000
CHUTAK NHPC LTD HYDRO-HYDRO 4400 22000 79800
DULHASTI HPS NHPC LTD HYDRO-HYDRO 39000 228000 56400
SALAL HPS NHPC LTD HYDRO-HYDRO 69000 342300 11000
TANAKPUR HPS NHPC LTD HYDRO-HYDRO 9420 43000 29600
URI HPS -I NHPC LTD HYDRO-HYDRO 48000 280300 16000
URI HPS - II NHPC LTD HYDRO-HYDRO 24000 147300 48600
NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 4500 24600 88200
SEWA - II NHPC LTD HYDRO-HYDRO 12000 47100 43400
ANTA CCPP NTPC LTD THERMAL-GASN 41930 67539 32400
AURAIYA CCPP NTPC LTD THERMAL-GASN 66336 53501 39100
BADARPUR TPS NTPC LTD THERMAL-COAL 70500 159153 44800
DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 84000 296170 42300
DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 98000 526686 46300
DADRI CCPP NTPC LTD THERMAL-GASHSD 82978 227469 33000
FARIDABAD CCPP NTPC LTD THERMAL-GASN 43159 115577 30800
RIHAND STPS I NTPC LTD THERMAL-COAL 100000 596766 24500
RIHAND STPS II NTPC LTD THERMAL-COAL 100000 737069 24600
RIHAND STPS III NTPC LTD THERMAL-COAL 100000 706546 30600
SINGRAULI STPS NTPC LTD THERMAL-COAL 200000 1394068 20400
TANDA TPS NTPC LTD THERMAL-COAL 44000 295438 40800
UNCHAHAR TPS I NTPC LTD THERMAL-COAL 42000 256454 39800
UNCHAHAR TPS II NTPC LTD THERMAL-COAL 42000 273577 38900
UNCHAHAR TPS III NTPC LTD THERMAL-COAL 21000 142780 43000
KOLDAM NTPC LTD HYDRO-HYDRO 80000 363260 43600
NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 303575 25841
RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 108000 668677 35374
NJHPS SJVNL HYDRO-HYDRO 150000 699496 23820
RAMPUR HPS SJVNL HYDRO-HYDRO 41202 195982 32260
TEHRI HPP THDC HYDRO-HYDRO 100000 272543 51800
KOTESHWAR HEP THDC HYDRO-HYDRO 40000 106244 53400
IGSTPS JHAJJAR ARAVALI P CPL THERMAL-COAL 150000 510429 49490
NEYVELI BARSINGSAR NEYVELI LIG CORP LTD THERMAL-LIG 25000 127520 38040
STATE SECTOR
PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 21000 14222 48200
PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 21000 19205 48400
PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 25000 102257 42600
PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 25000 62107 41800
DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 60000 312213 41000
RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 120000 35767442200
WYC HYDEL STATION HPGCL HYDRO-HYDRO 6240 20365 24900
GIRI POWER HOUSE HPSEB HYDRO-HYDRO 6000 13958 7600
ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 1695 5467 11900
BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 12000 18528 6700
GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 2250 7462 22500
BASSI POWER HOUSE HPSEB HYDRO-HYDRO 6600 29649 7500
BINWA POWER HOUSE HPSEB HYDRO-HYDRO 600 2749 19300
ANNEXURE-I
RATE OF SALE OF POWER FOR THE YEAR 2016-2017
Page 33
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) GAJ POWER HOUSE HPSEB HYDRO-HYDRO 1050 2914 26700
BANER POWER HOUSE HPSEB HYDRO-HYDRO 1200 2864 16200
HOLI POWER HOUSE HPSEB HYDRO-HYDRO 300 616 22500
THIROT POWER HOUSE HPSEB HYDRO-HYDRO 450 1126 22500
KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 1200 3064 22500
LARJI POWER HOUSE HPSEB HYDRO-HYDRO 12600 53677 23700
NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 250 750 31000
CHABA POWER HOUSE HPSEB HYDRO-HYDRO 175 465 23300
RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 150 101 13400
SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 200 000 22500
KILLAR HPSEB HYDRO-HYDRO 030 050 22500
BHABA AUGUMENP H HPSEB HYDRO-HYDRO 450 1276 22500
BS CHAMBA HPSEB HYDRO-HYDRO 045 099 19500
GUMMA HPSEB HYDRO-HYDRO 300 423 22500
GAS TURBINE POWER STATION IPGCL THERMAL-GAS 27000 67233 39300
PPS-I PPCL THERMAL-GAS 33000 175905 38300
PPS-III PPCL THERMAL-GAS 137120 196879 36100
LOWER JHELUM JampKPDD HYDRO-HYDRO 10500 60214 5100
UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 2260 10514 6300
UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 10500 44202 8500
GANDHARBAL JampKPDD HYDRO-HYDRO 1500 8925 4700
KARNAH MPH JampKPDD HYDRO-HYDRO 200 1122 31000
CHENANI I JampKPDD HYDRO-HYDRO 2330 10892 6600
CHENANI II JampKPDD HYDRO-HYDRO 200 1188 9300
CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 750 3634 14200
IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 375 2108 18500
IGO MERCHELLONG JampKPDD HYDRO-HYDRO 300 1572 29700
PAHALGAM MHP JampKPDD HYDRO-HYDRO 450 1713 32900
MARPACHOO JampKPDD HYDRO-HYDRO 075 375 29800
HAFTAL JampKPDD HYDRO-HYDRO 100 483 28700
SANJAK JampKPDD HYDRO-HYDRO 126 441 36000
SEWA-III JampKPDD HYDRO-HYDRO 900 3273 20200
BHADERWAH JampKPDD HYDRO-HYDRO 150 935 8900
BAZGO JampKPDD HYDRO-HYDRO 030 108 33300
SUMOOR JampKPDD HYDRO-HYDRO 010 045 35400
HUNDER JampKPDD HYDRO-HYDRO 040 176 26200
STAKNA JampKPDD HYDRO-HYDRO 400 1933 4100
KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 124000 662879 31360
SURATGARH TPS RRVUNL THERMAL-COAL 150000 402328 41730
CHHABRA TPS 1amp 2 RRVUNL THERMAL-COAL 50000 305946 36700
CHHABRA TPS 3 RRVUNL THERMAL-COAL 25000 151536 36700
CHHABRA TPS 4 RRVUNL THERMAL-COAL 25000 155896 36700
RAMGARH GT POWER PROJECT RRVUNL THERMAL-COAL 22050 43177 41800
RAMGARH GAS T P PROJECT 3 RRVUNL THERMAL-GAS 5000 93615 41800
DHOLPUR C C POWER PROJECT RRVUNL THERMAL-R-LNG 33000 9486 46110
MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 14000 20855 34192
MINI MICRO HYDEL (MMH) P S RRVUNL HYDRO-HYDRO 2385 851 37800
KALISINDH TPP 1 RRVUNL THERMAL-COAL 60000 341543 45000
KALISINDH TPP 2 RRVUNL THERMAL-COAL 60000 211588 45000
KHARA HEP UPJVNL HYDRO-HYDRO 7200 26654 7200
MATATILLA HEP UPJVNL HYDRO-HYDRO 3060 12219 6500
OBRA HEP UPJVNL HYDRO-HYDRO 9900 21517 6300
RIHAND UPJVNL HYDRO-HYDRO 30000 57369 5500
ANPARA A TPS UPRVUNL THERMAL-COAL 63000 317536 27000
ANPARA B TPS UPRVUNL THERMAL-COAL 100000 705605 22700
ANPARA D UPRVUNL THERMAL-COAL 100000 300158 39800
HARDUAGANJ TPS UPRVUNL THERMAL-COAL 16500 45817 49200
HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 50000 304389 46600
OBRA A TPS UPRVUNL THERMAL-COAL 28800 13158 34000
OBRA B TPS UPRVUNL THERMAL-COAL 100000 328124 21900
Page 34
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) PANKI TPS UPRVUNL THERMAL-COAL 21000 66488 50300
PARICHHA TPS UPRVUNL THERMAL-COAL 22000 38762 49400
PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 42000 231931 45600
PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 50000 276722 50400
CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 24000 70845 8290
CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 14400 75366 8390
DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 3375 9595 12080
DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 5100 18701 10520
KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4140 17359 12330
KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 12000 33001 9420
KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 3000 11953 8320
TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 9000 33983 12460
MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 30400 124510 16110
RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 19800 17897 10550
MPUR UTTARAKHAND JVNL HYDRO-HYDRO 930 5121 19200
PATHRI UTTARAKHAND JVNL HYDRO-HYDRO 2040 11636 14200
GALOGI UTTARAKHAND JVNL HYDRO-HYDRO 300 648 12500
PRIVATE SECTOR
MGTPP CLP INDIA PVT LTD THERMAL-COAL 132000 268902 41940
SHRINAGAR HEP ALAKNANDA HPCL HYDRO-HYDRO 33000 127414 48800
GAMA INFRAPROP CCPP GAMA INFRAPROP PVT THERMAL-GAS 22500 52686 47000
PPGCL (BARA) JP POWER VENTURES LTD THERMAL-COAL 198000 448200 38500
MALANA HEP MALANA PCL HYDRO-HYDRO 8600 26354 29792
MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 10000 30369 32580
ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 19200 56347 36079
KASHANG HEP H P PCL HYDRO-HYDRO 19500 5034 29200
BASPA-II HEP HBPCL HYDRO-HYDRO 30000 132769 13600
KARCHAM WANGTOO HEP HBPCL HYDRO-HYDRO 100000 434386 36600
RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 108000 582600 43700
RITHALA COMBI CY POWER PLANT TATA POWER DDL THERMAL-GAS 9480 000 11900
RAJPURA TPS NABHA POWER LTD THERMAL-GAS 140000 901484 39000
TALWANDI SABO POWER LTD TALWANDI SABO POWER LTD THERMAL-COAL 198000 636040 49548
ROJA THERMAL POWER STATION ROJA POWER SCL THERMAL-COAL 120000 727200 43400
KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 34400 63400
BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 36000 62600
MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 38200 60800
UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 37900 61500
KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 42300 58800
LALITPUR PGCL BAJAJ ENERGY PVT LTD THERMAL-COAL 198000 359400 47300
PRAYAGRAJ PGCL PRAYAGRAJ PGCL THERMAL-COAL 132000 448200 38595
KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 132000 783182 33438
WESTERN REGION
CENTRAL SECTOR
INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 100000 325333 23892
OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 52000 141663 34001
GANDHAR CCPP NTPC LTD THERMAL-GAS 65739 221924 28700
KAWAS CCPP NTPC LTD THERMAL-GASN 65620 167929 27000
KORBA I amp II NTPC LTD THERMAL-COAL 210000 1499171 20500
KORBA III NTPC LTD THERMAL-COAL 50000 358746 26600
SIPAT STPS I NTPC LTD THERMAL-COAL 198000 1479902 26800
SIPAT STPS II NTPC LTD THERMAL-COAL 100000 766549 26500
VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 126000 693142 25800
VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 100000 608781 23800
VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 100000 673475 27600
VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 100000 655924 32900
VINDHYACHAL STPS V NTPC LTD THERMAL-COAL 50000 328265 31700
MOUDA I NTPC LTD THERMAL-COAL 100000 343130 44500
MOUDA Ii NTPC LTD THERMAL-COAL 66000 40637 39900
RATNAGIRI GAS amp POWER PVT LTD RGPPL THERMAL-GAS 196708 442485 47000
KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 000 24729
TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 32000 201227 10740
Page 35
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 365122 19069
TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 787444 29324
STATE SECTOR
GSEG-HAZIRA15610 MW GUJARAT S ENEGEN LTD THERMAL-GAS 15610 1805 28200
GSEG-HAZIRA35143 MW GUJARAT S ENEGEN LTD THERMAL-GAS 35130 22276 51300
GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 21978 51800
AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 13929 26100
KORBA TPS EAST CSPGCL THERMAL-COAL 44000 198673 33880
DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 365808 27570
KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 316500 30420
HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 532878 19410
CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 515 58300
MTTPS CHAMPA U-I CSPGCL THERMAL-COAL 50000 220376 39000
MTTPS CHAMPA U-II CSPGCL THERMAL-COAL 50000 23709 10000
SHP GANGREL CSPGCL HYDRO-HYDRO 1000 2350 36790
BANGO HEP CSPGCL HYDRO-HYDRO 12000 14662 8900
MHP KORBA WEST CSPGCL HYDRO-HYDRO 170 859 38190
SIKASAR HEP CSPGCL HYDRO-HYDRO 700 418 26870
DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8843 74500
DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 19446 51500
GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 66388 71600
GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127488 41300
KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 96072 43900
KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 29841 56400
SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 184966 58800
UKAI 1-5 GSECL THERMAL-COAL 85000 204891 46900
UKAI TPS 6 GSECL THERMAL-COAL 50000 284448 48200
WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 271999 58300
WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 82808 44100
KADANA HPS GSECL HYDRO-HYDRO 24200 34433 16800
UKAI HPS GSECL HYDRO-HYDRO 30500 40585 6100
TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 123000 11500
BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 8900 10900
BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 7200 27500
JHINNA HPS MPPGCL HYDRO-HYDRO 2000 9700 18500
RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 44300 3400
GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 17300 4600
SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 4100 16900
MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 14600 27000
PENCH HPS MPPGCL HYDRO-HYDRO 16000 23700 8100
RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 3000 16900
AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 134400 35100
SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 283800 38700
SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 344600 34300
SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 111600 61600
SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 211800 58000
SSTPS PH-I MPPGCL THERMAL-COAL 120000 233100 84300
BHUSAWAL TPS MSPGCL THERMAL-COAL 142000 566258 51100
CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1365682 33700
KHAPERKHEDA MSPGCL THERMAL-COAL 134000 706207 39100
KORADI TPS MSPGCL THERMAL-COAL 62000 443206 42000
NASIK TPS MSPGCL THERMAL-COAL 63000 297275 47000
PARLI TPS MSPGCL THERMAL-COAL 113000 175934 71600
PARAS MSPGCL THERMAL-COAL 50000 267931 38700
URAN CCPP MSPGCL THERMAL-GAS 67200 320330 30600
KOYANA MSPGCL HYDRO-HYDRO 195600 328155 13100
SMALL HYDRO POWER PLANTS MSPGCL HYDRO-HYDRO 45400 93062 30500
BHIRA MSPGCL HYDRO-HYDRO 8000 10046 8400
TILLARI MSPGCL HYDRO-HYDRO 8900 10584 3100
SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 233298 20500
SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 87633 20500
PRIVATE SECTOR
Page 36
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 81282 46750
JNSTPP(JAYPEE NIGRIE) JP POWER VENTURES LTD THERMAL-COAL 132000 726695 29310
MB POWER MB POWER THERMAL-COAL 120000 345632 38310
ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 754922 28671
ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 780761 23495
ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 198000 1263784 32090
ADANI POWER MAHARA ADANI POWER LTD THERMAL-COAL 330000 1666191 34124
AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 170065 36827
SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 252035 45129
ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 458551 36000
ESSAR POWER MP LTD ESSAR POWER MP LTD THERMAL-COAL 60000 243040 28600
VEDANTA LTD (P P -I) VEDANTA LTD THERMAL-GAS 3000 15044 24000
VEDANTA LTD (P P -II) VEDANTA LTD THERMAL-GAS 3000 21293 24000
PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 8234600 24000
165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 5850 64390
145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 68717 40349
SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 132655 28776
SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 144686 38567
MUNDRA UMPPCOASTAL GUJARAT POWER
LTD THERMAL-IMP COAL 400000 2530300
23900
LANCO AMARKANTAK TPP PATHADIH
U-ILANCO AMARKAN POWER LTD THERMAL-COAL 30000 195500
29200
LANCO AMARKANTAK TPP PATHADIH
U-IILANCO AMARKAN POWER LTD THERMAL-COAL 30000 206900
27600
BARADARHA TPS D B POWER LTD THERMAL-COAL 120000 677373 29200
JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 405000 28900
JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 453000 40500
DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 339437 40700
TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 293400 44000
TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 137200 37000
TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 174900 44000
BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 92900 14100
BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23700 34300
KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 27600 48300
CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2530300 23900
BHANDARDRA HEP -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 2475 54900
SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 161400 26500
SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 445000 39000
SOTHERN REGION
CENTRAL SECTOR
NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 325699 54820
NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 305532 39880
NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 998805 38510
NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 113016 54070
NEYVELI TAMILNADU POWER LTD JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 625274 42200
VALLUR TPS NTPC TECL THERMAL-COAL 150000 856438 42350
R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 1493 84300
RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1502919 29400
RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 341291 31800
SIMHADRI I NTPC LTD THERMAL-COAL 100000 688382 36800
SIMHADRI II NTPC LTD THERMAL-COAL 100000 663657 43400
KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 593110 31324
MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 291625 21764
KKNPP-1 amp 2 NPCIL NUCLEAR-NUCLEAR 200000 572609 40948
MINICOY LAKSHADEEP THERMAL-DIESEL 340 770 29600
KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1097 29600
AMINI LAKSHADEEP THERMAL-DIESEL 265 509 29600
ANDROTT LAKSHADEEP THERMAL-DIESEL 219 524 29600
KALPENI LAKSHADEEP THERMAL-DIESEL 175 356 29600
AGATTI LAKSHADEEP THERMAL-DIESEL 195 658 29600
KADMAT LAKSHADEEP THERMAL-DIESEL 190 414 29600
KILTAN LAKSHADEEP THERMAL-DIESEL 150 269 29600
CHETLET LAKSHADEEP THERMAL-DIESEL 100 139 29600
BITRA LAKSHADEEP THERMAL-DIESEL 043 024 29600
BANGARAM LAKSHADEEP THERMAL-DIESEL 018 009 29600
Page 37
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) STATE SECTOR
Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 721811 46500
Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 50000 336142 46500
RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 237358 46500
RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 239926 46500
RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 124500 46500
SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 62109 46500
UPPER SILERU APGENCO HYDRO-HYDRO 24000 33000 46500
LOWER SILERU APGENCO HYDRO-HYDRO 46000 81066 46500
DONKARAI APGENCO HYDRO-HYDRO 2500 6007 46500
PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 1262 46500
CHETTIPETA APGENCO HYDRO-HYDRO 100 214 46500
MUCHKUND APGENCO HYDRO-HYDRO 12000 37571 46500
NAGARJUNASAGAR RCPH APGENCO HYDRO-HYDRO 9000 606 46500
TUNGABHADRA HES amp HAMPI(AP
Share)
APGENCO HYDRO-HYDRO 7200 6100 46500
KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 352232 42600
KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 288131 32500
KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 319272 46500
RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 40073 44300
KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 308317 46000
KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 308963 51300
SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 61004 76600
NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 17960 75300
PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 20873 58300
POCHAMPAD-I TSPGENCO HYDRO-HYDRO 2700 5455 29800
POCHAMPAD-II TSPGENCO HYDRO-HYDRO 900 1932 40700
NIZAMSAGAR TSPGENCO HYDRO-HYDRO 1000 1126 53400
RAICHUR TPS 1 to 7 KPCL THERMAL-COAL 147000 890866 43800
RAICHUR TPS 8 KPCL THERMAL-COAL 25000 159523 48200
BELLARI TPS 1 KPCL THERMAL-COAL 50000 318679 51100
BELLARI TPS 2 KPCL THERMAL-COAL 50000 232347 55600
BELLARI TPS 3 KPCL THERMAL-COAL 70000 47565 34400
BHADRA PH KPCL HYDRO-HYDRO 3920 2369 45900
GERUSUPPA PH KPCL HYDRO-HYDRO 24000 26990 22000
GHAT PRABHA HEP KPCL HYDRO-HYDRO 3200 4777 25300
KADRA HPS KPCL HYDRO-HYDRO 15000 16889 26800
NAGJHARI KPCL HYDRO-HYDRO 90000 155159 9800
KODASALLI DPH KPCL HYDRO-HYDRO 12000 14854 19200
MUNIRA+MGH+SPH+SPH KPCL HYDRO-HYDRO 22640 48211 7900
SHARAVATHY HPS KPCL HYDRO-HYDRO 108550 276215 5400
ALMATTI DPH KPCL HYDRO-HYDRO 29000 39611 24600
VARAHI UGPH KPCL HYDRO-HYDRO 46000 71368 15600
IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 17196 15300
IDUKKI HPS KSEB HYDRO-HYDRO 78000 137905 15300
KAKKAD HPS KSEB HYDRO-HYDRO 5000 13063 15300
KALLADA HPS KSEB HYDRO-HYDRO 1500 4436 15300
KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 46544 15300
KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 635 15300
LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 30822 15300
MALANKARA HPS KSEB HYDRO-HYDRO 1050 2474 15300
MATTUPETTY KSEB HYDRO-HYDRO 200 230 15300
MALAMPUZHA KSEB HYDRO-HYDRO 250 063 15300
CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 864 15300
URUMI ST I amp II KSEB HYDRO-HYDRO 615 903 15300
LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 248 15300
NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7765 19625 15300
PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 16601 15300
PANNIAR HPS KSEB HYDRO-HYDRO 3240 6217 15300
PORINGALKUTHU KSEB HYDRO-HYDRO 3600 10052 15300
PORINGALKUTHU LBE KSEB HYDRO-HYDRO 1600 9438 15300
PEPPARA KSEB HYDRO-HYDRO 300 395 15300
POOZHITHODE KSEB HYDRO-HYDRO 480 1045 15300
Page 38
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) PEECHI KSEB HYDRO-HYDRO 125 040 15300
RANI-PERUNADU KSEB HYDRO-HYDRO 400 585 15300
SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 79783 15300
SENGULAM HPS KSEB HYDRO-HYDRO 5120 11558 15300
SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 16711 15300
VILANGAD KSEB HYDRO-HYDRO 750 1578 15300
BARAPOLE KSEB HYDRO-HYDRO 1500 1932 15300
VELLATHOOVAL KSEB HYDRO-HYDRO 360 305 15300
CHIM0NY KSEB HYDRO-HYDRO 250 156 15300
ADYANPARA KSEB HYDRO-HYDRO 350 501 15300
BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 554 15300
KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 3801 15300
KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 23132 32800
ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 14416 62280
METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 523970 62280
METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 321270 62280
NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 336575 62280
NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 591240 62280
TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 508966 62280
KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 30897 62280
VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 18720 90699 62280
KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 33593 62280
BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 1047 62280
PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 1250 62280
PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 330 62280
MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 4897 62280
MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 032 62280
KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15681 62280
KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 40608 62280
KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 21342 62280
KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 4717 62280
KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4322 62280
KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2399 62280
METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 4416 62280
METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 8035 62280
BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2187 62280
BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2359 62280
BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2511 62280
BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 1949 62280
BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 1819 62280
POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 172 62280
SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 241 62280
MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 026 62280
THIRUMOORTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 136 62280
PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 9309 62280
VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 353 62280
SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 4192 62280
PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 6571 62280
SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 1186 62280
SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6319 62280
ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 6122 62280
KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 28674 62280
SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 18381 62280
SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 4258 62280
KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 12680 62280
KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4201 62280
ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 000 62280
PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 19175 62280
AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 078 62280
BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 504 62280
BHAVANI KATTALAI (BKB)(IIIampIII BB I amp II)TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 5847 62280
PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 000 62280
Page 39
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) SRI DAMODARAM STPS APPDCL THERMAL-COAL 160000 808108 36300
PRIVATE SECTOR
KARUPPUR TANJORE LANCO TANJORE PCL THERMAL-GAS 12000 48096 28770
SIMHAPURI ENERGY LTD SIMHAPURI ENERGY LTD THERMAL-COAL 60000 143900 39100
JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 7111 45500
SBU 1 JSW ENERGY LTD
VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 26000 159100
43300
SBU 2 JSW ENERGY LTD
VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 60000 247900
42800
LANCO KPLLANCO KONDAPALLI POWER
LTDTHERMAL-GAS 36814 85060
25776
LANCO KPL STG -IILANCO KONDAPALLI POWER
LTDTHERMAL-GAS 36600 12979
46330
LANCO KPL STG -IIIALANCO KONDAPALLI POWER
LTDTHERMAL-GAS 37100 85710
46330
LANCO KPL STG -III BLANCO KONDAPALLI POWER
LTDTHERMAL-GAS 37100 43639
46330
HINDUJA NATIONAL PCL HINDUJA NATIONAL PCL THERMAL-COAL 104000 303000 38200
MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 121164 49940
UDUPI POWER COR LTD ADANI POWER LTD THERMAL-COAL 120000 754613 42500
SPECTRUM POWER GENERATION
LTD SPECTRUM PG LTD THERMAL-GASN 20525 9256812
34952
TAQA NEYVELI POWER COM PVT
LTD TAQA NEYVELI THERMAL-LIG 25000 5840
34500
ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 251000 51000
ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 207860 36800
GMR VEMAGIRI POWER GENERATION
LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 30117
46450
EASTERN REGION
CENTRAL SECTOR
MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 64675 53113
MTPS STAGE - II KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 39000 1432 69138
BOKARO `B` TPS DVC THERMAL-COAL 63000 145670 31539
MEJIA TPS U 1-3 DVC THERMAL-COAL 63000 348298 31552
MEJIA TPS U 4 DVC THERMAL-COAL 21000 116099 34997
MEJIA TPS U 5-6 DVC THERMAL-COAL 50000 276427 35976
MEJIA TPS U 7-8 DVC THERMAL-COAL 100000 552854 36991
DURGAPUR STEEL TPS DVC THERMAL-COAL 100000 665550 39323
DURGAPUR TPS DVC THERMAL-COAL 21000 59270 35416
RAGHUNATHPUR TPS DVC THERMAL-COAL 120000 201650 35326
MAITHON HYDEL STA DVC HYDRO-HYDRO 6320 12200 17984
CHANDRAPURA TPSU1-3 DVC THERMAL-COAL 42000 257610 35095
CHANDRAPURA TPSU7-8 DVC THERMAL-COAL 50000 306673 34987
KODERMA TPS DVC THERMAL-COAL 100000 380180 38131
PANCHET HPS DVC HYDRO-HYDRO 8000 13360 17984
TILLAYA HPS DVC HYDRO-HYDRO 400 1410 17984
RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34700 35400
TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 277300 23200
TLDP -III NHPC LTD HYDRO-HYDRO 13200 55400 62000
TLDP -IV NHPC LTD HYDRO-HYDRO 16000 60300 25600
FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 957219 33700
FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 308943 41000
BONGAINGAON TPS NTPC LTD THERMAL-COAL 25000 153663 58600
KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 542277 34200
KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 942591 34200
BARH-II NTPC LTD THERMAL-COAL 132000 728021 44500
TALCHER TPS NTPC LTD THERMAL-COAL 46000 335521 30100
TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 702319 25600
TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1436521 24700
STATE SECTOR
BTPS(RampM) BIHAR STATE PGCL THERMAL-COAL 22000 12142 39700
BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 98331 10602
HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 50593 9482
CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 19689 2605
RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 53192 6033
UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 147208 14637
Page 40
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 60353 4519
IB TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 288567 25000
J P H GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 210 038 61100
MEYONG CHU GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 400 1086 61100
TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 122667 38200
DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 214339 43321
KOLAGHAT THERMAL POWER
STATION
WEST BENGAL PDCL THERMAL-COAL 126000 538269 31603
BAKRESHWAR THERMAL POWER
PLANT
WEST BENGAL PDCL THERMAL-COAL 105000 634876 32154
BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 45000 166855 33299
SANTHALDIH THERMAL POWER
STATION
WEST BENGAL PDCL THERMAL-COAL 50000 336442 34932
SAGARDIGHI THERMAL POWER
PROJECT
WEST BENGAL PDCL THERMAL-COAL 160000 423121 34705
JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 20344 68900
RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 24559 68900
TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 4623 68900
PURULIA PUMPED STORAGE
PROJECT
WEST BENGAL SEDCL HYDRO-HYDRO 90000 108816 68900
MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2768 68900
PRIVATE SECTOR
CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 49474 20230
CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 555500 70200
HALDIA ENERGY HALDIA ENERGY LTD THERMAL-COAL 60000 371000 50400
DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3688 63400
KAMALANGA TPS GMR KAMALANGA ENERGY LTD THERMAL-COAL 105000547670
33300
ADHUNIK POWER U-1 ADHUNIK POWER THERMAL-COAL 27000 158 44060
ADHUNIK POWER U-2 ADHUNIK POWER THERMAL-COAL 27000 168 44250
VL-JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 332800 23622
JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 43000 45250
JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 71700 37030
JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 70700 35920
JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 71100 38870
JOJOBERA UNIT 5 TATA POWER COM LTD THERMAL-COAL 12000 79300 44560
JOJOBERA UNIT 6 TATA POWER COM LTD THERMAL-WHR 12000 83700 12840
IEL KALINGANAGAR U-I TATA POWER COM LTD THERMAL-WG 6750 33400 22500
IEL KALINGANAGAR U-II TATA POWER COM LTD THERMAL-WG 6750 34800 22500
MAITHON UNIT 1 amp 2 TATA POWER COM LTD THERMAL-COAL 105000 678000 36100
HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 27500 24340
HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 28400 24340
HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 15800 24310
NORTH EASTERN REGION
CENTRAL SECTOR
LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 74100 36600
AGARTALA GT NEEPCO THERMAL-GAS 13500 88611 27210
ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 153111 32310
DOYANG HEP NEEPCO HYDRO-HYDRO 7500 25598 49801
KOPILI HEP NEEPCO HYDRO-HYDRO 20000 98186 11491
KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 19582 20237
KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 10310 17968
RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 124093 22945
TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 10100 17344 39000
STATE SECTOR
HYDRO POWER (122 Stns) ITANAGAR GOVT OF ARUNACHAL
PRADESHHYDRO-HYDRO 6971 6217270
24600
KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39514 17337
LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 82327 36810
NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 33318 48290
MYNTRIANG SHEP ST II ASSAM POWER GENCO HYDRO-HYDRO 300 567 35776
LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 9130 49200
LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 012 49200
DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 022 49200
TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 000 49200
UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 4990 16000
UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 6476 37000
UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 16494 14600
UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 3600 9556 15000
SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 758 8000
MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44070 44800
KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 154 41400
TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 091 41400
MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 411 41400
MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 394 41400
KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 760 41400
SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 3264 41400
LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 044 41400
BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 18953 28000
ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 43585 28200
GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 4080 11100
Note
LIG Lignite N Naptha WHR Waste Heat Recovery
Page 41
File NoCEA-CH-14-1142018-Coordination Division
SrNo Contents Page
1 Executive summary of Target and Achievement of Transmission Lines during 2018-19
20(1)
2 List of Transmission Lines CommissionedReady for commissioning during Oct-2018 20(2)
Section C - Transmission Lines
File NoCEA-CH-14-1142018-Coordination Division
Executive summary of Target and Achievement of Transmission Lines during 2018-19 As on Oct-18
(All figures in circuit kms)
Centr
al S
ecto
r
Sta
te S
ecto
r
JV
Private
Secto
r
To
tal
Centr
al S
ecto
r
Sta
te S
ecto
r
JV
Private
Secto
r
To
tal
Centr
al S
ecto
r
Sta
te S
ecto
r
JV
Private
Secto
r
To
tal
Centr
al S
ecto
r
Sta
te S
ecto
r
JV
Private
Secto
r
To
tal
Centr
al S
ecto
r
Sta
te S
ecto
r
JV
Private
Secto
r
To
tal
Cen
tral S
ecto
r
Sta
te S
ecto
r
JV
Pri
vate
Secto
r
Gra
nd
To
tal
0 0 0 0 0 0 0 0 4692 766 827 6285 3045 5906 980 9931 553 5878 0 6431 8290 12550 1807 22647
Oct18 Programme 0 0 0 0 0 0 0 0 300 0 0 300 662 90 562 1314 0 723 0 723 962 813 562 2337
Achievement 0 0 0 0 0 0 0 0 729 0 0 729 471 266 0 737 0 401 0 401 1200 667 0 1867
Upto Oct-18 Programme 0 0 0 0 0 0 0 0 3004 416 0 3420 1350 3109 562 5021 481 4346 0 4827 4835 7871 562 13268
Achievement 0 0 0 0 0 0 0 0 2286 0 178 2464 1436 1783 1595 4814 60 4461 0 4521 3782 6244 1773 11799
20(1)
220 kV Grand Total 800 kV 500 kV
Programme 2018-19
Programme
Achievement
HVDC765 kV 400 kV
File NoCEA-CH-14-1142018-Coordination Division
SlNo Line
Length
(cKM)
1 2 3 4 5 6
1 765 Jharsuguda - Dharamjaygarh line DC PGCIL 296
2 765LILO of Kurnool - Thirvualam line at
CuddapahDC PGCIL 190
3 765 Salem PS - Madhugiri PS line SC PGCIL 243
4 400 Cuddapah - Hindupur line (Q) DC PGCIL 338
5 400LILO of Both Ckt of Bamnauli - Samaypur at
TughlakabadMC PGCIL 114
6 400LILO-Out of Cuddapah - Hindupur line (Q)
(Both Ckts) at NP Kunta ssDC PGCIL 19
1200
7 400LILO of Sterlite - Meramundali at Lapanga
4oo kV ssDC OPTCL 14
8 400 Sterlite - Lapanga line DC OPTCL 37
9 400 TMDC Podili - Sattapenalli line DC APTRANSCO 215
10 230Neyveli 230110 kV ss - Eachangadu
230kV FeederSC TANTRANSCO 1
11 230 NNTPS - Neyveli 230110kV ss DC TANTRANSCO 2
12 220 Ajmer (400 kV) - Bherunda (TK) DC RVPNL 100
13 220 Aligarh - Atrauli line DC UPPTCL 77
14 220 Khandwa - Chhanera line DC MPPTCL 78
15 220LILO of one Ckt of Hadala - Sartanpar line
at Wankaner on MC towersDC GETCO 6
16 220 LILO of one Ckt of Vita - Miraj at Alkud ss DC MSETCL 27
17 220 Mendhigiri - Alkud ss DC MSETCL 110
667
1867
20(2)
Grand Total
2Transmission Lines (220 kV and above) CommissionedReady for commissioning During Oct-2018
As on 31-10-18
Voltage
Level (kV)Name of Transmission Lines
Circuit
Type
Executing
Agency
CENTRAL SECTOR
Total of CENTRAL SECTOR
STATE SECTOR Sector
Total of STATE SECTOR
File NoCEA-CH-14-1142018-Coordination Division
SN Contents Page
1 Executive summary of Target and Achievement of Substations during 2018-19 21(1)
2Sub Stations (220 kV and above) commissionedready for commisssioning during Oct-
201821(2)
Section D - Sub Stations
File NoCEA-CH-14-1142018-Coordination Division
1 Executive summary of Target and Achievement of Substations during 2018-19 As on Oct-18
(All figures in circuit MVA)
Centr
al S
ecto
r
Sta
te S
ecto
r
JV
Private
Secto
r
To
tal
Centr
al S
ecto
r
Sta
te S
ecto
r
JV
Private
Secto
r
To
tal
Centr
al S
ecto
r
Sta
te S
ecto
r
JV
Private
Secto
r
To
tal
Centr
al S
ecto
r
Sta
te S
ecto
r
JV
Private
Secto
r
To
tal
Centr
al S
ecto
r
Sta
te S
ecto
r
JV
Private
Secto
r
To
tal
Cen
tral S
ecto
r
Sta
te S
ecto
r
JV
Pri
vate
Secto
r
Gra
nd
To
tal
3000 0 0 3000 0 0 0 0 22200 0 0 22200 8185 13085 630 21900 740 14760 0 15500 34125 27845 630 62600
Oct18 Programme 0 0 0 0 0 0 0 0 0 0 0 0 1000 1260 630 2890 0 1400 0 1400 1000 2660 630 4290
Achievement 0 0 0 0 0 0 0 0 3000 0 0 3000 1500 3120 0 4620 0 2220 0 2220 4500 5340 0 9840
Upto Oct-18 Programme 0 0 0 0 0 0 0 0 10000 0 0 10000 6130 7435 630 14195 0 9670 0 9670 16130 17105 630 33865
Achievement 0 0 0 0 0 0 0 0 14000 0 0 14000 9000 7550 630 17180 0 10610 0 10610 23000 18160 630 41790
21(1)
220 kV Grand Total 800 kV 500 kV
Programme 2018-19
Programme
Achievement
HVDC765 kV 400 kV
File NoCEA-CH-14-1142018-Coordination Division
As on 31-10-18
Sl Voltage Ratio Capacity
No (kVkV) (MWMVA)
1 2 3 4 5
1 Cuddapah Ss 765400 PGCIL 3000
2 Tughlakabad SS (GIS) 400220 PGCIL 1500
Total of CENTRAL SECTOR 4500
3 Panki Kanpur (Aug) TF-I 400200 UPPTCL 75
4 Hindupur ss (1st ICT) 400220 APTRANSCO 315
5 Thappagundu ss 400110 TANTRANSCO 600
6 Mendhasal (2nd power TF) 400220 OPTCL 20
7 Jodhpur ss (New) 400220 RVPNL 315
8 Shankarpally 400220 TSTRANSCO 500
9 Podili ss (1st ICT) 400220 APTRANSCO 315
10 Doni (Gadag)SS 400220 KPTCL 1000
11 Porur (Addl TF) 230110 TANTRANSCO 100
12 Anuppankulam (Addl TF) 230110 TANTRANSCO 60
13 Neyveli SS 230110 TANTRANSCO 480
14 Savarkundla (Aug) 22066 GETCO 60
15 Bhuna (Aug) 220132 HVPNL 100
16 Madanpur (Aug) 22066 HVPNL 100
17 Gurgaon Sec-52A (Aug) 22066 HVPNL 160
18 IA Hisar (Aug) 220132 HVPNL 50
19 Narwana (Aug) 220132 HVPNL 60
20 Therubali (3rd Auto TF) 220132 OPTCL 160
21 Halasar ss 220132 RVPNL 160
22 Bansi Siddaharthnagar (Aug) TF-I 220132 UPPTCL 60
23 Hata Kushinagar (New) TF-I 220132 UPPTCL 100
24 Gomti nagar Lucknow (Aug) TF-IV 22033 UPPTCL 60
25 Kanpur Road Lucknow (New) TF-III 22033 UPPTCL 60
26 Asoj (Aug) 22066 GETCO 150
27 Kangasiyali (Aug) 22066 GETCO 60
28 Karmsad (Aug) 22066 GETCO 160
29 Lalpar (Aug) 22066 GETCO 60
TOTAL STATE SECTOR 5340
GRAND TOTAL 9840
21(2)
PRIVATE SECTOR
CENTRAL SECTOR
STATE SECTOR
2Sub-Stations (220 kV and above) CommissionedReady for commissioning During Oct-2018
Name of Sub StationsExecuting
Agency
File NoCEA-CH-14-1142018-Coordination Division
SN Contents Page
1 Electricity Generation (MU) Targets and Achievements for 2018-19 22
Section E - Electricity Generation
File NoCEA-CH-14-1142018-Coordination Division
Programme Achievement Ach Programme Achievement Ach
Central Sector 35160700 3028100 3162321 10443 20144400 21150469 10499
State Sector 35132000 3010000 3017260 10024 19922100 19549030 9813
PvtIPP Sector 36999700 3240600 3375603 10417 21598300 20794155 9628
PvtUTL Sector 1857600 164500 180597 10979 1130900 1203107 10638
Total 109150000 9443200 9735781 10310 62795700 62696761 9984
Central Sector 5617600 420900 451004 10715 4193000 4045436 9648
State Sector 6110600 559500 708469 12663 4049400 4433000 10947
PvtIPP Sector 1141800 80500 90122 11195 976400 1021963 10467
PvtUTL Sector 130000 11300 12564 11119 76700 99943 13030
Total 13000000 1072200 1262159 11772 9295500 9600342 10328
Central Sector 3850000 353300 303310 8585 2068900 2203540 10651
Total 3850000 353300 303310 8585 2068900 2203540 10651
Bhutan Import 500000 63300 35395 5592 347000 416660 12007
Central Sector 44628300 3802300 3916635 10301 26406300 27399445 10376
State Sector 41242600 3569500 3725729 10438 23971500 23982030 10004
Pvt Sector 40129100 3496900 3658886 10463 23782300 23119168 9721
Total 126500000 10932000 11336645 10370 74507100 74917303 10055
Provisional based on actual-cum-Assesment
Figs in MU
Cummulative
Achievement
Cummulative
Achievement
Sep-18 Sep-17 Upto Sep-2018 Upto Sep-2017
1073794 748889 7332680 5660929
22
Renewable Energy Generation
Achievement
Oct-2018
1 Electricity Generation (MU) Targets and Achievememts for 2018-19
All India Energy Generation During April 2018- Oct 2018 (MU)
Target (2018-19)April 2018- Oct 2018
Sector
Hydro
Thermal
Nuclear
627957
92955
20689
745071
626968
96003
22035
749173
0
100000
200000
300000
400000
500000
600000
700000
800000
Thermal Hydro Nuclear Total
Programme
Achievement
File NoCEA-CH-14-1142018-Coordination Division
SN Contents Page
1 Energy Power Supply Position (Provisional) for Oct-2018 and during April 2018- Oct 2018 23
2 Peak Power Supply Position (Provisional) for Oct-2018 and during April 2018- Oct 2018 24
3 Energy Power Supply Position (Revised) for Sep-2018 and during April 2018- Sept 2018 25
4 Peak Power Supply Position (Revised) for Sep-2018 and during April 2018- Sept 2018 26
5 Notified Power cuts Restrictions on Industries during Oct-2018 27
6 Power Supply to Agricultural Sector during Oct-2018 28
Section F - Power supply position
File NoCEA-CH-14-1142018-Coordination Division
आकड़ मममलयन यननट नट Figures in MU net
ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied
कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )
चडीगढ़ Chandigarh 108 108 0 00 1055 1055 0 00
दिलली Delhi 2490 2489 1 00 22524 22510 14 01
हरियजणज Haryana 4554 4554 0 00 35205 35205 0 00
दहमजचल परिश Himachal Pradesh 788 787 2 02 5728 5560 168 29
रमम कशमीि Jammu amp Kashmir 1497 1219 278 186 10982 8865 2117 193
परजब Punjab 4418 4418 0 00 38832 38819 13 00
िजरसथजन Rajasthan 6748 6748 0 00 45341 45181 160 04
उतति परिश Uttar Pradesh 10136 9973 164 16 75485 74808 676 09
उततिजखड Uttarakhand 1083 1081 3 03 8395 8310 85 10
उततरी कषतर Northern Region 31822 31375 447 14 243547 240314 3233 13
छततीसगढ़ Chhattisgarh 2454 2453 1 00 16119 16091 28 02
गरिजत Gujarat 11636 11636 0 00 70782 70768 14 00
मधय परिश Madhya Pradesh 5860 5859 1 00 38412 38410 2 00
महजिजषटर Maharashtra 15223 15095 128 08 95489 95355 134 01
िमन औि दिउ Daman amp Diu 216 216 0 00 1523 1523 0 00
िजिि व नगि हवली Dadra amp Nagar Haveli 553 553 0 00 3757 3757 0 00
गोवज Goa 366 366 0 00 2497 2495 2 01
पशचिमी कषतर Western Region 36308 36178 130 04 228579 228398 180 01
आनधर परिश Andhra Pradesh 5860 5854 6 01 37377 37334 43 01
तलगजनज Telangana 6748 6742 6 01 38251 38205 46 01
कनजाटक Karnataka 5842 5835 7 01 39111 39059 52 01
किल Kerala 2116 2096 20 09 14256 14160 96 07
तममल नजड Tamil Nadu 8611 8601 10 01 65742 65666 76 01
पडचिी Puducherry 216 215 1 05 1654 1646 8 05
लकष-दवीप Lakshadweep 4 4 0 0 27 27 0 0
दकषकषणी कषतर Southern Region 29392 29342 50 02 196390 196069 321 02
बबहजि Bihar 2742 2738 4 01 19143 18951 192 10
िजमोिि घजटी ननगम DVC 1712 1698 13 08 13096 12828 268 20
झजिखणड Jharkhand 701 697 4 06 5022 4949 73 15
ओडडशज Odisha 3147 3134 13 04 20224 20192 32 02
पशशचम बगजल West Bengal 4204 4200 4 01 33008 32881 127 04
मसशककम Sikkim 40 40 0 00 279 279 0 01
अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 67 202 188 13 67
परवी कषतर Eastern Region 12547 12507 40 03 90772 90080 692 08
अरणजचल परिश Arunachal Pradesh 67 66 1 09 502 496 7 13
असम Assam 833 809 24 29 6153 5903 250 41
मणणपि Manipur 72 71 1 10 485 478 7 14
मघजलय Meghalaya 147 147 0 00 1043 1042 0 00
ममज़ोिम Mizoram 63 62 1 08 365 359 5 14
नजगजलड Nagaland 76 67 8 110 540 481 59 109
बिपिज Tripura 130 129 1 09 1025 1007 19 18
उततर-परवी कषतर North-Eastern Region 1387 1351 35 25 10113 9766 346 34
समपणण भारत All India 111455 110753 702 06 769399 764627 4773 06
23
ऊराण वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Energy Power Supply Position Report (Provisional)
राजयStateअकरबर2018 October2018 अपरल2018 -अकरबर2018 April2018 to October2018
ऊरजा पनत ा म कमी ऊरजा पनत ा म कमीEnergy not Supplied
Excludes energy exported to Bangladesh
Energy not Supplied
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
File NoCEA-CH-14-1142018-Coordination Division
अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met
कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )
चडीगढ़ Chandigarh 217 217 0 00 369 369 0 00
दिलली Delhi 4713 4713 0 00 7016 7016 0 00
हरियजणज Haryana 7948 7948 0 00 10270 10270 0 00
दहमजचल परिश Himachal Pradesh 1520 1520 0 00 1520 1520 0 00
रमम कशमीि Jammu amp Kashmir 2836 2269 567 200 2951 2361 590 200
परजब Punjab 7979 7979 0 00 12638 12638 0 00
िजरसथजन Rajasthan 11450 11450 0 00 11698 11698 0 00
उतति परिश Uttar Pradesh 17434 16745 688 39 20498 20062 436 21
उततिजखड Uttarakhand 1943 1943 0 00 2143 2143 0 00
उततरी कषतर Northern Region 50659 49635 1024 20 63166 61726 1440 23
छततीसगढ़ Chhattisgarh 4414 4268 146 33 4414 4268 146 33
गरिजत Gujarat 18148 18130 19 01 18148 18130 19 01
मधय परिश Madhya Pradesh 11356 11317 39 03 11356 11317 39 03
महजिजषटर Maharashtra 23864 23159 705 30 23864 23254 610 26
िमन औि दिउ Daman amp Diu 342 341 1 02 357 356 1 02
िजिि व नगि हवली Dadra amp Nagar Haveli 784 780 4 05 816 815 1 01
गोवज Goa 536 536 0 00 596 596 0 00
पशचिमी कषतर Western Region 56548 55695 853 15 56548 55695 853 15
आनधर परिश Andhra Pradesh 9435 9435 0 00 9435 9435 0 00
तलगजनज Telangana 10603 10603 0 00 10815 10815 0 00
कनजाटक Karnataka 10741 10741 0 00 10741 10741 0 00
किल Kerala 3727 3644 83 22 4050 3997 53 13
तममल नजड Tamil Nadu 14747 14333 414 28 15029 14981 47 03
पडचिी Puducherry 363 362 1 03 420 400 19 46
लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0
दकषकषणी कषतर Southern Region 45279 45226 53 01 45946 45684 262 06
बबहजि Bihar 4945 4945 0 00 5050 5045 5 01
िजमोिि घजटी ननगम DVC 2729 2729 0 00 2874 2874 0 00
झजिखणड Jharkhand 1260 1260 0 00 1339 1284 55 41
ओडडशज Odisha 5624 5224 400 71 5624 5357 268 48
पशशचम बगजल West Bengal 8775 8775 0 00 9130 9123 7 01
मसशककम Sikkim 86 86 0 00 90 90 0 00
अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7
परवी कषतर Eastern Region 22959 22567 392 17 22959 22567 392 17
अरणजचल परिश Arunachal Pradesh 138 125 13 94 138 133 5 37
असम Assam 1785 1704 81 45 1865 1809 56 30
मणणपि Manipur 187 185 2 11 193 186 7 36
मघजलय Meghalaya 336 336 0 00 371 368 2 07
ममज़ोिम Mizoram 99 97 2 20 103 98 4 41
नजगजलड Nagaland 134 131 3 22 156 138 18 117
बिपिज Tripura 269 269 0 00 298 293 5 17
उततर-परवी कषतर North-Eastern Region 2790 2700 90 32 2967 2850 117 39
समपणण भारत All India 172945 170604 2341 14 177022 175528 1494 08
24
अधिकतम वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Peak Power Supply Position Report (Provisional)
आकड़ मगज वजट नट Figures in MW netअपरल2018 -अकरबर2018 April2018 to October2018
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
मजग की पनता म कमी Demand not Met
Excludes the supply to Bangladesh
राजयStateअकरबर2018 October2018
मजग की पनता म कमी Demand not Met
File NoCEA-CH-14-1142018-Coordination Division
आकड़ मममलयन यननट नट Figures in MU net
ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied
कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )
चडीगढ़ Chandigarh 141 141 0 00 947 947 0 00
दिलली Delhi 2925 2924 1 00 20034 20021 13 01
हरियजणज Haryana 4794 4794 0 00 30651 30651 0 00
दहमजचल परिश Himachal Pradesh 876 853 24 27 4940 4773 167 34
रमम कशमीि Jammu amp Kashmir 1520 1246 274 180 9485 7646 1839 194
परजब Punjab 5575 5575 0 00 34414 34401 13 00
िजरसथजन Rajasthan 6202 6201 0 00 38594 38434 160 04
उतति परिश Uttar Pradesh 10211 10124 86 08 65349 64836 513 08
उततिजखड Uttarakhand 1162 1149 13 11 7311 7229 82 11
उततरी कषतर Northern Region 33405 33008 398 12 211725 208939 2786 13
छततीसगढ़ Chhattisgarh 2403 2388 15 06 13665 13638 27 02
गरिजत Gujarat 10122 10122 0 00 59146 59132 14 00
मधय परिश Madhya Pradesh 5492 5491 1 00 32552 32551 1 00
महजिजषटर Maharashtra 13615 13612 3 00 80266 80260 6 00
िमन औि दिउ Daman amp Diu 221 221 0 00 1306 1306 0 00
िजिि व नगि हवली Dadra amp Nagar Haveli 551 551 0 00 3204 3204 0 00
गोवज Goa 339 339 0 00 2131 2128 2 01
पशचिमी कषतर Western Region 32742 32723 19 01 192270 192220 50 00
आनधर परिश Andhra Pradesh 5294 5287 7 01 31518 31480 37 01
तलगजनज Telangana 6279 6272 8 01 31503 31463 40 01
कनजाटक Karnataka 5701 5693 8 01 33269 33225 45 01
किल Kerala 2050 2026 24 12 12140 12063 76 06
तममल नजड Tamil Nadu 8971 8959 12 01 57131 57065 66 01
पडचिी Puducherry 226 224 2 08 1438 1431 7 05
लकष-दवीप Lakshadweep 4 4 0 0 23 23 0 0
दकषकषणी कषतर Southern Region 28520 28460 60 02 166998 166727 271 02
बबहजि Bihar 2839 2793 46 16 16400 16213 188 11
िजमोिि घजटी ननगम DVC 1901 1750 151 79 11384 11130 254 22
झजिखणड Jharkhand 740 723 17 22 4321 4252 69 16
ओडडशज Odisha 2921 2918 3 01 17077 17058 19 01
पशशचम बगजल West Bengal 4902 4879 23 05 28804 28681 123 04
मसशककम Sikkim 39 39 0 01 239 239 0 01
अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 67 173 162 12 67
परवी कषतर Eastern Region 13341 13102 240 18 78225 77573 652 08
अरणजचल परिश Arunachal Pradesh 74 73 1 10 435 429 6 14
असम Assam 950 914 36 38 5320 5094 226 43
मणणपि Manipur 70 69 1 11 414 408 6 15
मघजलय Meghalaya 150 150 0 01 896 896 0 01
ममज़ोिम Mizoram 58 57 1 12 302 297 5 16
नजगजलड Nagaland 80 72 8 104 464 414 50 108
बिपिज Tripura 192 191 1 07 895 878 17 19
उततर-परवी कषतर North-Eastern Region 1575 1527 48 31 8726 8415 311 36
समपणण भारत All India 109584 108819 765 07 657944 653873 4071 06
Energy not Supplied Energy not Supplied
ससतबर2018 September2018 अपरल2018 -ससतबर2018 April2018 to September2018
ऊरजा पनत ा म कमी ऊरजा पनत ा म कमी
Excludes energy exported to Bangladesh
राजयState
ऊराण वरवदयत आपरतण शथिरत ररपोरण (सशोधित) Energy Power Supply Position Report (Revised)
25
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
File NoCEA-CH-14-1142018-Coordination Division
अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met
कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )
चडीगढ़ Chandigarh 293 293 0 00 369 369 0 00
दिलली Delhi 5358 5358 0 00 7016 7016 0 00
हरियजणज Haryana 9008 9008 0 00 10270 10270 0 00
दहमजचल परिश Himachal Pradesh 1466 1466 0 00 1479 1479 0 00
रमम कशमीि Jammu amp Kashmir 2951 2361 590 200 2951 2361 590 200
परजब Punjab 11405 11405 0 00 12638 12638 0 00
िजरसथजन Rajasthan 10612 10612 0 00 11698 11698 0 00
उतति परिश Uttar Pradesh 18346 18121 225 12 20498 20062 436 21
उततिजखड Uttarakhand 1996 1996 0 00 2143 2143 0 00
उततरी कषतर Northern Region 56407 55649 758 13 63166 61726 1440 23
छततीसगढ़ Chhattisgarh 4404 4075 328 75 4404 4136 268 61
गरिजत Gujarat 16963 16963 0 00 17053 16963 90 05
मधय परिश Madhya Pradesh 8811 8771 41 05 8811 8775 36 04
महजिजषटर Maharashtra 22455 22349 106 05 23395 23254 141 06
िमन औि दिउ Daman amp Diu 357 356 1 02 357 356 1 02
िजिि व नगि हवली Dadra amp Nagar Haveli 816 815 1 01 816 815 1 01
गोवज Goa 596 596 0 00 596 596 0 00
पशचिमी कषतर Western Region 52933 52895 38 01 53841 52895 945 18
आनधर परिश Andhra Pradesh 9435 9416 19 02 9435 9416 19 02
तलगजनज Telangana 10815 10815 0 00 10815 10815 0 00
कनजाटक Karnataka 10103 10090 13 01 10690 10688 2 00
किल Kerala 3888 3638 251 64 4050 3997 53 13
तममल नजड Tamil Nadu 14556 14553 3 00 15029 14981 47 03
पडचिी Puducherry 390 372 17 45 420 400 19 46
लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0
दकषकषणी कषतर Southern Region 45542 45428 114 02 45946 45684 262 06
बबहजि Bihar 5050 5045 5 01 5050 5045 5 01
िजमोिि घजटी ननगम DVC 2641 2641 0 00 2874 2874 0 00
झजिखणड Jharkhand 1233 1233 0 00 1339 1284 55 41
ओडडशज Odisha 4906 4906 0 00 5357 5357 0 00
पशशचम बगजल West Bengal 8644 8639 5 01 9130 9123 7 01
मसशककम Sikkim 78 78 0 00 90 90 0 00
अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7
परवी कषतर Eastern Region 22110 22100 10 00 22470 22290 180 08
अरणजचल परिश Arunachal Pradesh 132 130 2 15 138 133 5 37
असम Assam 1865 1809 56 30 1865 1809 56 30
मणणपि Manipur 184 182 2 13 193 186 7 36
मघजलय Meghalaya 317 317 0 00 371 368 2 07
ममज़ोिम Mizoram 95 93 2 23 103 98 4 41
नजगजलड Nagaland 142 138 5 32 156 138 18 117
बिपिज Tripura 296 293 3 10 298 293 5 17
उततर-परवी कषतर North-Eastern Region 2921 2850 71 24 2967 2850 117 39
समपणण भारत All India 177022 175528 1494 08 177022 175528 1494 08
26
मजग की पनता म कमी मजग की पनता म कमी Demand not MetDemand not Met
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
Excludes the supply to Bangladesh
अधिकतम वरवदयत आपरतण शथिरत ररपोरण (सशोधित) Peak Power Supply Position Report (Revised)
आकड़ मगज वजट नट Figures in MW net
राजयStateससतबर2018 September2018 अपरल2018 -ससतबर2018 April2018 to September2018
File NoCEA-CH-14-1142018-Coordination Division
अकरबर2018 October2018अपरल2018 -अकरबर2018 April2018 to October2018
उततरी कषतर Northern Region
चडीगढ़ Chandigarh Data not received Data not received
दिलली Delhi
हरियजणज Haryana
दहमजचल परिश Himachal Pradesh
रमम कशमीि Jammu amp Kashmir Data not received Data not received
परजब Punjab
िजरसथजन Rajasthanउतति परिश Uttar Pradesh
उततिजखड Uttarakhand
पशचिमी कषतर Western Region
छततीसगढ़ Chhattisgarh
गरिजत Gujarat
मधय परिश Madhya Pradesh
महजिजषटर Maharashtra
गोवज Goa
दकषकषणी कषतर Southern Region
आनधर परिश Andhra Pradesh
तलगजनज Telangana
कनजाटक Karnataka
किल Kerala
तममल नजड Tamil Nadu
पडचिी Puducherryपरवी कषतर Eastern Region
बबहजि Bihar
झजिखणड Jharkhand
ओडडशज Odisha
पशशचम बगजल West Bengal
N
o No
tified
Cuts
N
o No
tified
Cuts
27
अकरबर 2018 म इडथरीर पर वरवदयत करौती का वरवरवरण Notified Power CutsRestrictions on Industries during October2018
राजय कषतर State Regionऊराणमाग करौती EnergyDemand Cut
No Notified Cuts No Notified Cuts
File NoCEA-CH-14-1142018-Coordination Division
अकरबर2018 October2018अपरल2018 -अकरबर2018 April2018 to October2018
उततरी कषतर Northern Region
चडीगढ़ Chandigarh Data not received Data not received
दिलली Delhi Data not received Data not received
हरियजणज Haryana 940 hrsday 0709 - 0950 hrsday
दहमजचल परिश Himachal Pradesh No cut imposed on agriculture consumers and uninterrupted
power is being supplied to agriculture sector
HPSEBL has only 2 agriculture consumers and uninterrupted
power is being supplied to agriculture sector
रमम कशमीि Jammu amp Kashmir Data not received Data not received
परजब Punjab 0507 hrsday 0349 - 0844 hrsday
िजरसथजन Rajasthan 0630 hrsday 0630 hrsday
उतति परिश Uttar Pradesh 1825 hrsday 1814 - 1858 hrsday
उततिजखड Uttarakhand 2350 hrsday 2128 - 2357 hrsday
पशचिमी कषतर Western Region
छततीसगढ़ Chhattisgarh 18hoursday 18 hrsday
गरिजत Gujarat 805 hrsday 805 hrsday
मधय परिश Madhya Pradesh Three-Phase Supply(Irrigation)-947 hrs day
Three-Phase (Mixed) Supply - 2311 hrs day
Three-Phase Supply(Irrigation)- 0933 - 0947 hrs day Three-
Phase (Mixed) Supply - 2300 - 2320 hrs day
महजिजषटर Maharashtra Three-Phase Supply(Irrigation)- 9 hrs day
Three-Phase (Mixed) Supply - 24 hrs day
Three-Phase Supply(Irrigation)- 9 hrs day
Three-Phase (Mixed) Supply - 24 hrs day
गोवज Goa No restriction No restriction
दकषकषणी कषतर Southern Region
आनधर परिश Andhra Pradesh 07 hrsday 07 hrsday
तलगजनज Telangana 24 hoursday 24 hoursday
कनजाटक Karnataka 6 hrsday 6 hrsday
किल Kerala No Restrictions No Restrictions
तममल नजड Tamil Nadu 9 hrsday (6 hrs during day time and 3 hrs during night time) 9 hrsday (6 hrs during day time and 3 hrs during night time)
पडचिी Puducherry No Restrictions No Restrictions
परवी कषतर Eastern Region
बबहजि Bihar About 18 hrsday About 18 hrsday
झजिखणड Jharkhand About 20 hrsday About 20 hrsday
ओडडशज Odisha 24 hrsday 24 hrsday
पशशचम बगजल West Bengal About 23 hrsday About 23 hrsday
28
अकटबर 2018 कषि कषतर को षिदयत आपरति का षििरण Power Supply to Agricultural Sector during October2018
राजय कषतर State Regionऔसत वरवदयत आपरतण घनरो म Average Hours of Supply
On segregated feeders
File NoCEA-CH-14-1142018-Coordination Division
SNo Contents Page
1 Growth of Installed Capacity since 6th Plan 29
2 Progress of Transmission Sector since 6th Plan 30
3 All India Yearly Coal consumption for Power Generation (Utilities)
4 All India Annual Per Capita Consumption of Electricity since -2006
5 Average cost of power supply amp Average realisation (Paisakwh)
6 Growth of Rural Electrification amp Pump Sets Energisation
7 Status of Hydro Schemes Cleared by the CEA in Oct-2018
Section G - Growth of Power Sector
31
32
File NoCEA-CH-14-1142018-Coordination Division
(In MW)
Coal Gas Diesel Total
End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472
End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634
End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537
End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596
End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921
End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703
End of 12th Plan 19216288 2532938 83763 21832988 6780 4447842 50018 31960630
Up to Oct-2018 19599250 2493722 837629 22176734 6780 4548742 7201281 34604757
Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-17) = 51529 MW
Electricity Generation (MU) Targets and Achievements for 2016-17
Coal Gas Diesel Nuclear Hydro Res Total
1959925 2493722 837629 678000 454874 72012805 22925174
29
1 Growth of Installed Capacity Since 6th Plan
Plan YearThermal
Nuclear Hydro RES (MNRE) Total
Total Installed Capacity 34604757 MW
Coal Gas Diesel Nuclear Hydro Res
File NoCEA-CH-14-1142018-Coordination Division
Progress of Transmission Sector in the Country up to Oct 2018
1 TRANSMISSION LINES (All fig in CKM)
At the end of
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
6th plan 0 0 0 0 0 0 0 0 0 0 0 0 1831 4198 0 6029 1641 44364 0 46005 3472 48562 0 52034
7th plan 0 0 0 0 0 0 0 0 0 0 0 0 13068 6756 0 19824 4560 55071 0 59631 17628 61827 0 79455
8th plan 0 0 0 0 1634 0 0 1634 0 0 0 0 23001 13141 0 36142 6564 73036 0 79600 31199 86177 0 117376
9th plan 0 0 0 0 3234 1504 0 4738 751 409 0 1160 29345 20033 0 49378 8687 88306 0 96993 42017 110252 0 152269
10th plan 0 0 0 0 4368 1504 0 5872 1775 409 0 2184 48708 24730 0 73438 9444 105185 0 114629 64295 131828 0 196123
11th Plan 0 0 0 0 5948 1504 1980 9432 4839 411 0 5250 71023 30191 5605 106819 10140 125010 830 135980 91950 157116 8415 257481
12th Plan 6124 0 0 6124 5948 1504 1980 9432 25465 1177 4598 31240 92482 48240 17065 157787 11014 151276 978 163268 141033 202197 24621 367851
13th Plan (Up
to Mar2018)6124 0 0 6124 5948 1504 1980 9432 28666 1512 4881 35059 98247 54286 19067 171600 11258 156497 1000 168755 150243 213799 26928 390970
13th Plan (Up
to Sep-18)6124 0 0 6124 5948 1504 1980 9432 30952 1512 5059 37523 99683 56069 20662 176414 11318 160958 1000 173276 154025 220043 28701 402769
27150
75050
47900
118050
90650
30
IR addition in 12th Plan (up to
March 2017)
Total IR (up to Oct-18)
IR at the end of 11th Plan
IR at the end of 12th Plan
Envisaged IR Capacity at the end
of 13th Plan
Grand Total
Note - The figure upto the end of 10th plan in for stringing progress including the lines not commissioned Now only commissioned lines are reckoned Accordingly the figure for 10th plan (end) may read as 187555 after adjusting with (-) 10852 Ckm
Inter-regional Power Transfer Capacity
plusmn 800 kV HVDC plusmn 500 kV HVDC 765 kV 400 kV 220 kV
File NoCEA-CH-14-1142018-Coordination Division
2004-05 27800
2005-06 28100
2006-07 30200
2007-08 33000
2008-09 35500
2009-10 36700
2010-11 38700
2011-12 41756
2012-13 45460
2013-14 48940
2014-15 53040
2015-16 54590
2016-17 57430
2017-18 60800
Year
2005-06
2006-07
2007-08
2008-09
2009-10
2010-11
2011-12
2012-13
2013-14
2014-15
2015-16
2016-17
2017-18
2004-05 254 209 7568
2005-06 260 221 7636
2006-07 276 227 7423
2007-08 293 239 7727
2008-09 340 263 8713
2009-10 355 268 8870
2010-11 398 303 11975
2011-12 455 330 13514
2012-13 501 376 14867
2013-14 518 175
2014-15 520
6719
7171
3 All India yearly Coal Consumption for Power Generation (Utilities)
YEARCoal Consumption
Million Tonnes
4 All India Annual per Capita consumption of Electricity Since 2006
Per Capita Consumption ( kWh)
6314
(GrossGen+ Net Import) Mid-year population
5 Average cost of power supply amp average realization ( paiseKWH )
Yearcost of supply
(paiseunit)
Realization(paiseunit)
Including AgricultureOnly
Agriculture
1149
7335
7786
91441
8188
88363
957
1010
1075
1122
File NoCEA-CH-14-1142018-Coordination Division
Source- PFC Reports on the performance of State Power Utilities 31
File NoCEA-CH-14-1142018-Coordination Division
Sl
NoExecuting Agency
Installed
Capacity (MW)Cost (Rs crore)
Date of
Clearance
32
No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification
since 2004-05
65291374575 296361511th Plan
Cumu upto End of 11th Plan
596556 21212860
557439Cummulative up to end of 12th Plan
46708
18423975
499150
2003-042004-05
5743
9769
Cumu upto End of 10th Plan
010407 to 310308
010410 to 310311557976840909
010411 to 310312
412667
86293726
3207
482864
12632
1576036
4451722594
15455554
2314176
397343611750
2093311060316074
65109527813884
6 Growth Of Rural Electrification amp Pumpsets Energisation
Plan Year
9th Plan2002-03
134092626
4111
Pump Sets Energised Villages Electricfied (Nos)
2001-02
284064367244
1218
27801997-981998-991999-002000-01
297594
010408 to 310309010409 to 310310
10th Plan
2005-062006-07
322968331020
Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as
Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received
from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made
available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified
villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is
independent of the earlier published reports
No Hydro Electric Project has been issued concurrenceAppraisal letter by CEA during October 2018
7 Status of Hydro Schemes Cleared by the CEA in Oct-2018
Name of Scheme
File NoCEA-CH-14-1142018-Coordination Division
SN Contents Page
1 Rate of sale of power for the year 2016-17 33-41
RATE OF SALE OF POWER FOR THE YEAR 2016-17
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) NORTHERN REGION
CENTRAL SECTOR
BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 18000 66900 19800
CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 54000 222400 21600
CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 30000 144400 19600
CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 23100 91700 42600
PARBATI - III HPS NHPC LTD HYDRO-HYDRO 52000 68200 54800
DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 28000 95600 30000
CHUTAK NHPC LTD HYDRO-HYDRO 4400 22000 79800
DULHASTI HPS NHPC LTD HYDRO-HYDRO 39000 228000 56400
SALAL HPS NHPC LTD HYDRO-HYDRO 69000 342300 11000
TANAKPUR HPS NHPC LTD HYDRO-HYDRO 9420 43000 29600
URI HPS -I NHPC LTD HYDRO-HYDRO 48000 280300 16000
URI HPS - II NHPC LTD HYDRO-HYDRO 24000 147300 48600
NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 4500 24600 88200
SEWA - II NHPC LTD HYDRO-HYDRO 12000 47100 43400
ANTA CCPP NTPC LTD THERMAL-GASN 41930 67539 32400
AURAIYA CCPP NTPC LTD THERMAL-GASN 66336 53501 39100
BADARPUR TPS NTPC LTD THERMAL-COAL 70500 159153 44800
DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 84000 296170 42300
DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 98000 526686 46300
DADRI CCPP NTPC LTD THERMAL-GASHSD 82978 227469 33000
FARIDABAD CCPP NTPC LTD THERMAL-GASN 43159 115577 30800
RIHAND STPS I NTPC LTD THERMAL-COAL 100000 596766 24500
RIHAND STPS II NTPC LTD THERMAL-COAL 100000 737069 24600
RIHAND STPS III NTPC LTD THERMAL-COAL 100000 706546 30600
SINGRAULI STPS NTPC LTD THERMAL-COAL 200000 1394068 20400
TANDA TPS NTPC LTD THERMAL-COAL 44000 295438 40800
UNCHAHAR TPS I NTPC LTD THERMAL-COAL 42000 256454 39800
UNCHAHAR TPS II NTPC LTD THERMAL-COAL 42000 273577 38900
UNCHAHAR TPS III NTPC LTD THERMAL-COAL 21000 142780 43000
KOLDAM NTPC LTD HYDRO-HYDRO 80000 363260 43600
NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 303575 25841
RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 108000 668677 35374
NJHPS SJVNL HYDRO-HYDRO 150000 699496 23820
RAMPUR HPS SJVNL HYDRO-HYDRO 41202 195982 32260
TEHRI HPP THDC HYDRO-HYDRO 100000 272543 51800
KOTESHWAR HEP THDC HYDRO-HYDRO 40000 106244 53400
IGSTPS JHAJJAR ARAVALI P CPL THERMAL-COAL 150000 510429 49490
NEYVELI BARSINGSAR NEYVELI LIG CORP LTD THERMAL-LIG 25000 127520 38040
STATE SECTOR
PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 21000 14222 48200
PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 21000 19205 48400
PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 25000 102257 42600
PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 25000 62107 41800
DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 60000 312213 41000
RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 120000 35767442200
WYC HYDEL STATION HPGCL HYDRO-HYDRO 6240 20365 24900
GIRI POWER HOUSE HPSEB HYDRO-HYDRO 6000 13958 7600
ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 1695 5467 11900
BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 12000 18528 6700
GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 2250 7462 22500
BASSI POWER HOUSE HPSEB HYDRO-HYDRO 6600 29649 7500
BINWA POWER HOUSE HPSEB HYDRO-HYDRO 600 2749 19300
ANNEXURE-I
RATE OF SALE OF POWER FOR THE YEAR 2016-2017
Page 33
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) GAJ POWER HOUSE HPSEB HYDRO-HYDRO 1050 2914 26700
BANER POWER HOUSE HPSEB HYDRO-HYDRO 1200 2864 16200
HOLI POWER HOUSE HPSEB HYDRO-HYDRO 300 616 22500
THIROT POWER HOUSE HPSEB HYDRO-HYDRO 450 1126 22500
KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 1200 3064 22500
LARJI POWER HOUSE HPSEB HYDRO-HYDRO 12600 53677 23700
NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 250 750 31000
CHABA POWER HOUSE HPSEB HYDRO-HYDRO 175 465 23300
RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 150 101 13400
SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 200 000 22500
KILLAR HPSEB HYDRO-HYDRO 030 050 22500
BHABA AUGUMENP H HPSEB HYDRO-HYDRO 450 1276 22500
BS CHAMBA HPSEB HYDRO-HYDRO 045 099 19500
GUMMA HPSEB HYDRO-HYDRO 300 423 22500
GAS TURBINE POWER STATION IPGCL THERMAL-GAS 27000 67233 39300
PPS-I PPCL THERMAL-GAS 33000 175905 38300
PPS-III PPCL THERMAL-GAS 137120 196879 36100
LOWER JHELUM JampKPDD HYDRO-HYDRO 10500 60214 5100
UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 2260 10514 6300
UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 10500 44202 8500
GANDHARBAL JampKPDD HYDRO-HYDRO 1500 8925 4700
KARNAH MPH JampKPDD HYDRO-HYDRO 200 1122 31000
CHENANI I JampKPDD HYDRO-HYDRO 2330 10892 6600
CHENANI II JampKPDD HYDRO-HYDRO 200 1188 9300
CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 750 3634 14200
IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 375 2108 18500
IGO MERCHELLONG JampKPDD HYDRO-HYDRO 300 1572 29700
PAHALGAM MHP JampKPDD HYDRO-HYDRO 450 1713 32900
MARPACHOO JampKPDD HYDRO-HYDRO 075 375 29800
HAFTAL JampKPDD HYDRO-HYDRO 100 483 28700
SANJAK JampKPDD HYDRO-HYDRO 126 441 36000
SEWA-III JampKPDD HYDRO-HYDRO 900 3273 20200
BHADERWAH JampKPDD HYDRO-HYDRO 150 935 8900
BAZGO JampKPDD HYDRO-HYDRO 030 108 33300
SUMOOR JampKPDD HYDRO-HYDRO 010 045 35400
HUNDER JampKPDD HYDRO-HYDRO 040 176 26200
STAKNA JampKPDD HYDRO-HYDRO 400 1933 4100
KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 124000 662879 31360
SURATGARH TPS RRVUNL THERMAL-COAL 150000 402328 41730
CHHABRA TPS 1amp 2 RRVUNL THERMAL-COAL 50000 305946 36700
CHHABRA TPS 3 RRVUNL THERMAL-COAL 25000 151536 36700
CHHABRA TPS 4 RRVUNL THERMAL-COAL 25000 155896 36700
RAMGARH GT POWER PROJECT RRVUNL THERMAL-COAL 22050 43177 41800
RAMGARH GAS T P PROJECT 3 RRVUNL THERMAL-GAS 5000 93615 41800
DHOLPUR C C POWER PROJECT RRVUNL THERMAL-R-LNG 33000 9486 46110
MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 14000 20855 34192
MINI MICRO HYDEL (MMH) P S RRVUNL HYDRO-HYDRO 2385 851 37800
KALISINDH TPP 1 RRVUNL THERMAL-COAL 60000 341543 45000
KALISINDH TPP 2 RRVUNL THERMAL-COAL 60000 211588 45000
KHARA HEP UPJVNL HYDRO-HYDRO 7200 26654 7200
MATATILLA HEP UPJVNL HYDRO-HYDRO 3060 12219 6500
OBRA HEP UPJVNL HYDRO-HYDRO 9900 21517 6300
RIHAND UPJVNL HYDRO-HYDRO 30000 57369 5500
ANPARA A TPS UPRVUNL THERMAL-COAL 63000 317536 27000
ANPARA B TPS UPRVUNL THERMAL-COAL 100000 705605 22700
ANPARA D UPRVUNL THERMAL-COAL 100000 300158 39800
HARDUAGANJ TPS UPRVUNL THERMAL-COAL 16500 45817 49200
HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 50000 304389 46600
OBRA A TPS UPRVUNL THERMAL-COAL 28800 13158 34000
OBRA B TPS UPRVUNL THERMAL-COAL 100000 328124 21900
Page 34
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) PANKI TPS UPRVUNL THERMAL-COAL 21000 66488 50300
PARICHHA TPS UPRVUNL THERMAL-COAL 22000 38762 49400
PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 42000 231931 45600
PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 50000 276722 50400
CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 24000 70845 8290
CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 14400 75366 8390
DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 3375 9595 12080
DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 5100 18701 10520
KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4140 17359 12330
KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 12000 33001 9420
KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 3000 11953 8320
TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 9000 33983 12460
MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 30400 124510 16110
RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 19800 17897 10550
MPUR UTTARAKHAND JVNL HYDRO-HYDRO 930 5121 19200
PATHRI UTTARAKHAND JVNL HYDRO-HYDRO 2040 11636 14200
GALOGI UTTARAKHAND JVNL HYDRO-HYDRO 300 648 12500
PRIVATE SECTOR
MGTPP CLP INDIA PVT LTD THERMAL-COAL 132000 268902 41940
SHRINAGAR HEP ALAKNANDA HPCL HYDRO-HYDRO 33000 127414 48800
GAMA INFRAPROP CCPP GAMA INFRAPROP PVT THERMAL-GAS 22500 52686 47000
PPGCL (BARA) JP POWER VENTURES LTD THERMAL-COAL 198000 448200 38500
MALANA HEP MALANA PCL HYDRO-HYDRO 8600 26354 29792
MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 10000 30369 32580
ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 19200 56347 36079
KASHANG HEP H P PCL HYDRO-HYDRO 19500 5034 29200
BASPA-II HEP HBPCL HYDRO-HYDRO 30000 132769 13600
KARCHAM WANGTOO HEP HBPCL HYDRO-HYDRO 100000 434386 36600
RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 108000 582600 43700
RITHALA COMBI CY POWER PLANT TATA POWER DDL THERMAL-GAS 9480 000 11900
RAJPURA TPS NABHA POWER LTD THERMAL-GAS 140000 901484 39000
TALWANDI SABO POWER LTD TALWANDI SABO POWER LTD THERMAL-COAL 198000 636040 49548
ROJA THERMAL POWER STATION ROJA POWER SCL THERMAL-COAL 120000 727200 43400
KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 34400 63400
BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 36000 62600
MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 38200 60800
UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 37900 61500
KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 42300 58800
LALITPUR PGCL BAJAJ ENERGY PVT LTD THERMAL-COAL 198000 359400 47300
PRAYAGRAJ PGCL PRAYAGRAJ PGCL THERMAL-COAL 132000 448200 38595
KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 132000 783182 33438
WESTERN REGION
CENTRAL SECTOR
INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 100000 325333 23892
OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 52000 141663 34001
GANDHAR CCPP NTPC LTD THERMAL-GAS 65739 221924 28700
KAWAS CCPP NTPC LTD THERMAL-GASN 65620 167929 27000
KORBA I amp II NTPC LTD THERMAL-COAL 210000 1499171 20500
KORBA III NTPC LTD THERMAL-COAL 50000 358746 26600
SIPAT STPS I NTPC LTD THERMAL-COAL 198000 1479902 26800
SIPAT STPS II NTPC LTD THERMAL-COAL 100000 766549 26500
VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 126000 693142 25800
VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 100000 608781 23800
VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 100000 673475 27600
VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 100000 655924 32900
VINDHYACHAL STPS V NTPC LTD THERMAL-COAL 50000 328265 31700
MOUDA I NTPC LTD THERMAL-COAL 100000 343130 44500
MOUDA Ii NTPC LTD THERMAL-COAL 66000 40637 39900
RATNAGIRI GAS amp POWER PVT LTD RGPPL THERMAL-GAS 196708 442485 47000
KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 000 24729
TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 32000 201227 10740
Page 35
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 365122 19069
TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 787444 29324
STATE SECTOR
GSEG-HAZIRA15610 MW GUJARAT S ENEGEN LTD THERMAL-GAS 15610 1805 28200
GSEG-HAZIRA35143 MW GUJARAT S ENEGEN LTD THERMAL-GAS 35130 22276 51300
GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 21978 51800
AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 13929 26100
KORBA TPS EAST CSPGCL THERMAL-COAL 44000 198673 33880
DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 365808 27570
KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 316500 30420
HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 532878 19410
CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 515 58300
MTTPS CHAMPA U-I CSPGCL THERMAL-COAL 50000 220376 39000
MTTPS CHAMPA U-II CSPGCL THERMAL-COAL 50000 23709 10000
SHP GANGREL CSPGCL HYDRO-HYDRO 1000 2350 36790
BANGO HEP CSPGCL HYDRO-HYDRO 12000 14662 8900
MHP KORBA WEST CSPGCL HYDRO-HYDRO 170 859 38190
SIKASAR HEP CSPGCL HYDRO-HYDRO 700 418 26870
DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8843 74500
DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 19446 51500
GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 66388 71600
GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127488 41300
KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 96072 43900
KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 29841 56400
SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 184966 58800
UKAI 1-5 GSECL THERMAL-COAL 85000 204891 46900
UKAI TPS 6 GSECL THERMAL-COAL 50000 284448 48200
WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 271999 58300
WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 82808 44100
KADANA HPS GSECL HYDRO-HYDRO 24200 34433 16800
UKAI HPS GSECL HYDRO-HYDRO 30500 40585 6100
TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 123000 11500
BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 8900 10900
BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 7200 27500
JHINNA HPS MPPGCL HYDRO-HYDRO 2000 9700 18500
RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 44300 3400
GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 17300 4600
SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 4100 16900
MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 14600 27000
PENCH HPS MPPGCL HYDRO-HYDRO 16000 23700 8100
RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 3000 16900
AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 134400 35100
SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 283800 38700
SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 344600 34300
SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 111600 61600
SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 211800 58000
SSTPS PH-I MPPGCL THERMAL-COAL 120000 233100 84300
BHUSAWAL TPS MSPGCL THERMAL-COAL 142000 566258 51100
CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1365682 33700
KHAPERKHEDA MSPGCL THERMAL-COAL 134000 706207 39100
KORADI TPS MSPGCL THERMAL-COAL 62000 443206 42000
NASIK TPS MSPGCL THERMAL-COAL 63000 297275 47000
PARLI TPS MSPGCL THERMAL-COAL 113000 175934 71600
PARAS MSPGCL THERMAL-COAL 50000 267931 38700
URAN CCPP MSPGCL THERMAL-GAS 67200 320330 30600
KOYANA MSPGCL HYDRO-HYDRO 195600 328155 13100
SMALL HYDRO POWER PLANTS MSPGCL HYDRO-HYDRO 45400 93062 30500
BHIRA MSPGCL HYDRO-HYDRO 8000 10046 8400
TILLARI MSPGCL HYDRO-HYDRO 8900 10584 3100
SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 233298 20500
SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 87633 20500
PRIVATE SECTOR
Page 36
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 81282 46750
JNSTPP(JAYPEE NIGRIE) JP POWER VENTURES LTD THERMAL-COAL 132000 726695 29310
MB POWER MB POWER THERMAL-COAL 120000 345632 38310
ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 754922 28671
ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 780761 23495
ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 198000 1263784 32090
ADANI POWER MAHARA ADANI POWER LTD THERMAL-COAL 330000 1666191 34124
AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 170065 36827
SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 252035 45129
ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 458551 36000
ESSAR POWER MP LTD ESSAR POWER MP LTD THERMAL-COAL 60000 243040 28600
VEDANTA LTD (P P -I) VEDANTA LTD THERMAL-GAS 3000 15044 24000
VEDANTA LTD (P P -II) VEDANTA LTD THERMAL-GAS 3000 21293 24000
PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 8234600 24000
165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 5850 64390
145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 68717 40349
SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 132655 28776
SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 144686 38567
MUNDRA UMPPCOASTAL GUJARAT POWER
LTD THERMAL-IMP COAL 400000 2530300
23900
LANCO AMARKANTAK TPP PATHADIH
U-ILANCO AMARKAN POWER LTD THERMAL-COAL 30000 195500
29200
LANCO AMARKANTAK TPP PATHADIH
U-IILANCO AMARKAN POWER LTD THERMAL-COAL 30000 206900
27600
BARADARHA TPS D B POWER LTD THERMAL-COAL 120000 677373 29200
JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 405000 28900
JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 453000 40500
DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 339437 40700
TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 293400 44000
TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 137200 37000
TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 174900 44000
BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 92900 14100
BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23700 34300
KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 27600 48300
CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2530300 23900
BHANDARDRA HEP -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 2475 54900
SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 161400 26500
SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 445000 39000
SOTHERN REGION
CENTRAL SECTOR
NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 325699 54820
NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 305532 39880
NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 998805 38510
NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 113016 54070
NEYVELI TAMILNADU POWER LTD JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 625274 42200
VALLUR TPS NTPC TECL THERMAL-COAL 150000 856438 42350
R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 1493 84300
RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1502919 29400
RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 341291 31800
SIMHADRI I NTPC LTD THERMAL-COAL 100000 688382 36800
SIMHADRI II NTPC LTD THERMAL-COAL 100000 663657 43400
KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 593110 31324
MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 291625 21764
KKNPP-1 amp 2 NPCIL NUCLEAR-NUCLEAR 200000 572609 40948
MINICOY LAKSHADEEP THERMAL-DIESEL 340 770 29600
KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1097 29600
AMINI LAKSHADEEP THERMAL-DIESEL 265 509 29600
ANDROTT LAKSHADEEP THERMAL-DIESEL 219 524 29600
KALPENI LAKSHADEEP THERMAL-DIESEL 175 356 29600
AGATTI LAKSHADEEP THERMAL-DIESEL 195 658 29600
KADMAT LAKSHADEEP THERMAL-DIESEL 190 414 29600
KILTAN LAKSHADEEP THERMAL-DIESEL 150 269 29600
CHETLET LAKSHADEEP THERMAL-DIESEL 100 139 29600
BITRA LAKSHADEEP THERMAL-DIESEL 043 024 29600
BANGARAM LAKSHADEEP THERMAL-DIESEL 018 009 29600
Page 37
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) STATE SECTOR
Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 721811 46500
Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 50000 336142 46500
RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 237358 46500
RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 239926 46500
RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 124500 46500
SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 62109 46500
UPPER SILERU APGENCO HYDRO-HYDRO 24000 33000 46500
LOWER SILERU APGENCO HYDRO-HYDRO 46000 81066 46500
DONKARAI APGENCO HYDRO-HYDRO 2500 6007 46500
PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 1262 46500
CHETTIPETA APGENCO HYDRO-HYDRO 100 214 46500
MUCHKUND APGENCO HYDRO-HYDRO 12000 37571 46500
NAGARJUNASAGAR RCPH APGENCO HYDRO-HYDRO 9000 606 46500
TUNGABHADRA HES amp HAMPI(AP
Share)
APGENCO HYDRO-HYDRO 7200 6100 46500
KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 352232 42600
KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 288131 32500
KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 319272 46500
RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 40073 44300
KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 308317 46000
KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 308963 51300
SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 61004 76600
NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 17960 75300
PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 20873 58300
POCHAMPAD-I TSPGENCO HYDRO-HYDRO 2700 5455 29800
POCHAMPAD-II TSPGENCO HYDRO-HYDRO 900 1932 40700
NIZAMSAGAR TSPGENCO HYDRO-HYDRO 1000 1126 53400
RAICHUR TPS 1 to 7 KPCL THERMAL-COAL 147000 890866 43800
RAICHUR TPS 8 KPCL THERMAL-COAL 25000 159523 48200
BELLARI TPS 1 KPCL THERMAL-COAL 50000 318679 51100
BELLARI TPS 2 KPCL THERMAL-COAL 50000 232347 55600
BELLARI TPS 3 KPCL THERMAL-COAL 70000 47565 34400
BHADRA PH KPCL HYDRO-HYDRO 3920 2369 45900
GERUSUPPA PH KPCL HYDRO-HYDRO 24000 26990 22000
GHAT PRABHA HEP KPCL HYDRO-HYDRO 3200 4777 25300
KADRA HPS KPCL HYDRO-HYDRO 15000 16889 26800
NAGJHARI KPCL HYDRO-HYDRO 90000 155159 9800
KODASALLI DPH KPCL HYDRO-HYDRO 12000 14854 19200
MUNIRA+MGH+SPH+SPH KPCL HYDRO-HYDRO 22640 48211 7900
SHARAVATHY HPS KPCL HYDRO-HYDRO 108550 276215 5400
ALMATTI DPH KPCL HYDRO-HYDRO 29000 39611 24600
VARAHI UGPH KPCL HYDRO-HYDRO 46000 71368 15600
IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 17196 15300
IDUKKI HPS KSEB HYDRO-HYDRO 78000 137905 15300
KAKKAD HPS KSEB HYDRO-HYDRO 5000 13063 15300
KALLADA HPS KSEB HYDRO-HYDRO 1500 4436 15300
KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 46544 15300
KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 635 15300
LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 30822 15300
MALANKARA HPS KSEB HYDRO-HYDRO 1050 2474 15300
MATTUPETTY KSEB HYDRO-HYDRO 200 230 15300
MALAMPUZHA KSEB HYDRO-HYDRO 250 063 15300
CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 864 15300
URUMI ST I amp II KSEB HYDRO-HYDRO 615 903 15300
LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 248 15300
NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7765 19625 15300
PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 16601 15300
PANNIAR HPS KSEB HYDRO-HYDRO 3240 6217 15300
PORINGALKUTHU KSEB HYDRO-HYDRO 3600 10052 15300
PORINGALKUTHU LBE KSEB HYDRO-HYDRO 1600 9438 15300
PEPPARA KSEB HYDRO-HYDRO 300 395 15300
POOZHITHODE KSEB HYDRO-HYDRO 480 1045 15300
Page 38
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) PEECHI KSEB HYDRO-HYDRO 125 040 15300
RANI-PERUNADU KSEB HYDRO-HYDRO 400 585 15300
SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 79783 15300
SENGULAM HPS KSEB HYDRO-HYDRO 5120 11558 15300
SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 16711 15300
VILANGAD KSEB HYDRO-HYDRO 750 1578 15300
BARAPOLE KSEB HYDRO-HYDRO 1500 1932 15300
VELLATHOOVAL KSEB HYDRO-HYDRO 360 305 15300
CHIM0NY KSEB HYDRO-HYDRO 250 156 15300
ADYANPARA KSEB HYDRO-HYDRO 350 501 15300
BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 554 15300
KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 3801 15300
KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 23132 32800
ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 14416 62280
METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 523970 62280
METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 321270 62280
NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 336575 62280
NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 591240 62280
TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 508966 62280
KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 30897 62280
VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 18720 90699 62280
KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 33593 62280
BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 1047 62280
PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 1250 62280
PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 330 62280
MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 4897 62280
MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 032 62280
KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15681 62280
KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 40608 62280
KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 21342 62280
KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 4717 62280
KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4322 62280
KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2399 62280
METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 4416 62280
METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 8035 62280
BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2187 62280
BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2359 62280
BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2511 62280
BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 1949 62280
BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 1819 62280
POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 172 62280
SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 241 62280
MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 026 62280
THIRUMOORTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 136 62280
PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 9309 62280
VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 353 62280
SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 4192 62280
PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 6571 62280
SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 1186 62280
SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6319 62280
ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 6122 62280
KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 28674 62280
SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 18381 62280
SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 4258 62280
KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 12680 62280
KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4201 62280
ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 000 62280
PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 19175 62280
AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 078 62280
BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 504 62280
BHAVANI KATTALAI (BKB)(IIIampIII BB I amp II)TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 5847 62280
PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 000 62280
Page 39
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) SRI DAMODARAM STPS APPDCL THERMAL-COAL 160000 808108 36300
PRIVATE SECTOR
KARUPPUR TANJORE LANCO TANJORE PCL THERMAL-GAS 12000 48096 28770
SIMHAPURI ENERGY LTD SIMHAPURI ENERGY LTD THERMAL-COAL 60000 143900 39100
JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 7111 45500
SBU 1 JSW ENERGY LTD
VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 26000 159100
43300
SBU 2 JSW ENERGY LTD
VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 60000 247900
42800
LANCO KPLLANCO KONDAPALLI POWER
LTDTHERMAL-GAS 36814 85060
25776
LANCO KPL STG -IILANCO KONDAPALLI POWER
LTDTHERMAL-GAS 36600 12979
46330
LANCO KPL STG -IIIALANCO KONDAPALLI POWER
LTDTHERMAL-GAS 37100 85710
46330
LANCO KPL STG -III BLANCO KONDAPALLI POWER
LTDTHERMAL-GAS 37100 43639
46330
HINDUJA NATIONAL PCL HINDUJA NATIONAL PCL THERMAL-COAL 104000 303000 38200
MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 121164 49940
UDUPI POWER COR LTD ADANI POWER LTD THERMAL-COAL 120000 754613 42500
SPECTRUM POWER GENERATION
LTD SPECTRUM PG LTD THERMAL-GASN 20525 9256812
34952
TAQA NEYVELI POWER COM PVT
LTD TAQA NEYVELI THERMAL-LIG 25000 5840
34500
ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 251000 51000
ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 207860 36800
GMR VEMAGIRI POWER GENERATION
LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 30117
46450
EASTERN REGION
CENTRAL SECTOR
MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 64675 53113
MTPS STAGE - II KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 39000 1432 69138
BOKARO `B` TPS DVC THERMAL-COAL 63000 145670 31539
MEJIA TPS U 1-3 DVC THERMAL-COAL 63000 348298 31552
MEJIA TPS U 4 DVC THERMAL-COAL 21000 116099 34997
MEJIA TPS U 5-6 DVC THERMAL-COAL 50000 276427 35976
MEJIA TPS U 7-8 DVC THERMAL-COAL 100000 552854 36991
DURGAPUR STEEL TPS DVC THERMAL-COAL 100000 665550 39323
DURGAPUR TPS DVC THERMAL-COAL 21000 59270 35416
RAGHUNATHPUR TPS DVC THERMAL-COAL 120000 201650 35326
MAITHON HYDEL STA DVC HYDRO-HYDRO 6320 12200 17984
CHANDRAPURA TPSU1-3 DVC THERMAL-COAL 42000 257610 35095
CHANDRAPURA TPSU7-8 DVC THERMAL-COAL 50000 306673 34987
KODERMA TPS DVC THERMAL-COAL 100000 380180 38131
PANCHET HPS DVC HYDRO-HYDRO 8000 13360 17984
TILLAYA HPS DVC HYDRO-HYDRO 400 1410 17984
RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34700 35400
TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 277300 23200
TLDP -III NHPC LTD HYDRO-HYDRO 13200 55400 62000
TLDP -IV NHPC LTD HYDRO-HYDRO 16000 60300 25600
FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 957219 33700
FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 308943 41000
BONGAINGAON TPS NTPC LTD THERMAL-COAL 25000 153663 58600
KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 542277 34200
KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 942591 34200
BARH-II NTPC LTD THERMAL-COAL 132000 728021 44500
TALCHER TPS NTPC LTD THERMAL-COAL 46000 335521 30100
TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 702319 25600
TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1436521 24700
STATE SECTOR
BTPS(RampM) BIHAR STATE PGCL THERMAL-COAL 22000 12142 39700
BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 98331 10602
HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 50593 9482
CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 19689 2605
RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 53192 6033
UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 147208 14637
Page 40
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 60353 4519
IB TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 288567 25000
J P H GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 210 038 61100
MEYONG CHU GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 400 1086 61100
TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 122667 38200
DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 214339 43321
KOLAGHAT THERMAL POWER
STATION
WEST BENGAL PDCL THERMAL-COAL 126000 538269 31603
BAKRESHWAR THERMAL POWER
PLANT
WEST BENGAL PDCL THERMAL-COAL 105000 634876 32154
BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 45000 166855 33299
SANTHALDIH THERMAL POWER
STATION
WEST BENGAL PDCL THERMAL-COAL 50000 336442 34932
SAGARDIGHI THERMAL POWER
PROJECT
WEST BENGAL PDCL THERMAL-COAL 160000 423121 34705
JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 20344 68900
RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 24559 68900
TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 4623 68900
PURULIA PUMPED STORAGE
PROJECT
WEST BENGAL SEDCL HYDRO-HYDRO 90000 108816 68900
MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2768 68900
PRIVATE SECTOR
CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 49474 20230
CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 555500 70200
HALDIA ENERGY HALDIA ENERGY LTD THERMAL-COAL 60000 371000 50400
DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3688 63400
KAMALANGA TPS GMR KAMALANGA ENERGY LTD THERMAL-COAL 105000547670
33300
ADHUNIK POWER U-1 ADHUNIK POWER THERMAL-COAL 27000 158 44060
ADHUNIK POWER U-2 ADHUNIK POWER THERMAL-COAL 27000 168 44250
VL-JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 332800 23622
JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 43000 45250
JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 71700 37030
JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 70700 35920
JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 71100 38870
JOJOBERA UNIT 5 TATA POWER COM LTD THERMAL-COAL 12000 79300 44560
JOJOBERA UNIT 6 TATA POWER COM LTD THERMAL-WHR 12000 83700 12840
IEL KALINGANAGAR U-I TATA POWER COM LTD THERMAL-WG 6750 33400 22500
IEL KALINGANAGAR U-II TATA POWER COM LTD THERMAL-WG 6750 34800 22500
MAITHON UNIT 1 amp 2 TATA POWER COM LTD THERMAL-COAL 105000 678000 36100
HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 27500 24340
HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 28400 24340
HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 15800 24310
NORTH EASTERN REGION
CENTRAL SECTOR
LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 74100 36600
AGARTALA GT NEEPCO THERMAL-GAS 13500 88611 27210
ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 153111 32310
DOYANG HEP NEEPCO HYDRO-HYDRO 7500 25598 49801
KOPILI HEP NEEPCO HYDRO-HYDRO 20000 98186 11491
KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 19582 20237
KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 10310 17968
RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 124093 22945
TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 10100 17344 39000
STATE SECTOR
HYDRO POWER (122 Stns) ITANAGAR GOVT OF ARUNACHAL
PRADESHHYDRO-HYDRO 6971 6217270
24600
KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39514 17337
LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 82327 36810
NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 33318 48290
MYNTRIANG SHEP ST II ASSAM POWER GENCO HYDRO-HYDRO 300 567 35776
LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 9130 49200
LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 012 49200
DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 022 49200
TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 000 49200
UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 4990 16000
UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 6476 37000
UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 16494 14600
UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 3600 9556 15000
SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 758 8000
MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44070 44800
KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 154 41400
TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 091 41400
MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 411 41400
MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 394 41400
KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 760 41400
SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 3264 41400
LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 044 41400
BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 18953 28000
ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 43585 28200
GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 4080 11100
Note
LIG Lignite N Naptha WHR Waste Heat Recovery
Page 41
File NoCEA-CH-14-1142018-Coordination Division
Executive summary of Target and Achievement of Transmission Lines during 2018-19 As on Oct-18
(All figures in circuit kms)
Centr
al S
ecto
r
Sta
te S
ecto
r
JV
Private
Secto
r
To
tal
Centr
al S
ecto
r
Sta
te S
ecto
r
JV
Private
Secto
r
To
tal
Centr
al S
ecto
r
Sta
te S
ecto
r
JV
Private
Secto
r
To
tal
Centr
al S
ecto
r
Sta
te S
ecto
r
JV
Private
Secto
r
To
tal
Centr
al S
ecto
r
Sta
te S
ecto
r
JV
Private
Secto
r
To
tal
Cen
tral S
ecto
r
Sta
te S
ecto
r
JV
Pri
vate
Secto
r
Gra
nd
To
tal
0 0 0 0 0 0 0 0 4692 766 827 6285 3045 5906 980 9931 553 5878 0 6431 8290 12550 1807 22647
Oct18 Programme 0 0 0 0 0 0 0 0 300 0 0 300 662 90 562 1314 0 723 0 723 962 813 562 2337
Achievement 0 0 0 0 0 0 0 0 729 0 0 729 471 266 0 737 0 401 0 401 1200 667 0 1867
Upto Oct-18 Programme 0 0 0 0 0 0 0 0 3004 416 0 3420 1350 3109 562 5021 481 4346 0 4827 4835 7871 562 13268
Achievement 0 0 0 0 0 0 0 0 2286 0 178 2464 1436 1783 1595 4814 60 4461 0 4521 3782 6244 1773 11799
20(1)
220 kV Grand Total 800 kV 500 kV
Programme 2018-19
Programme
Achievement
HVDC765 kV 400 kV
File NoCEA-CH-14-1142018-Coordination Division
SlNo Line
Length
(cKM)
1 2 3 4 5 6
1 765 Jharsuguda - Dharamjaygarh line DC PGCIL 296
2 765LILO of Kurnool - Thirvualam line at
CuddapahDC PGCIL 190
3 765 Salem PS - Madhugiri PS line SC PGCIL 243
4 400 Cuddapah - Hindupur line (Q) DC PGCIL 338
5 400LILO of Both Ckt of Bamnauli - Samaypur at
TughlakabadMC PGCIL 114
6 400LILO-Out of Cuddapah - Hindupur line (Q)
(Both Ckts) at NP Kunta ssDC PGCIL 19
1200
7 400LILO of Sterlite - Meramundali at Lapanga
4oo kV ssDC OPTCL 14
8 400 Sterlite - Lapanga line DC OPTCL 37
9 400 TMDC Podili - Sattapenalli line DC APTRANSCO 215
10 230Neyveli 230110 kV ss - Eachangadu
230kV FeederSC TANTRANSCO 1
11 230 NNTPS - Neyveli 230110kV ss DC TANTRANSCO 2
12 220 Ajmer (400 kV) - Bherunda (TK) DC RVPNL 100
13 220 Aligarh - Atrauli line DC UPPTCL 77
14 220 Khandwa - Chhanera line DC MPPTCL 78
15 220LILO of one Ckt of Hadala - Sartanpar line
at Wankaner on MC towersDC GETCO 6
16 220 LILO of one Ckt of Vita - Miraj at Alkud ss DC MSETCL 27
17 220 Mendhigiri - Alkud ss DC MSETCL 110
667
1867
20(2)
Grand Total
2Transmission Lines (220 kV and above) CommissionedReady for commissioning During Oct-2018
As on 31-10-18
Voltage
Level (kV)Name of Transmission Lines
Circuit
Type
Executing
Agency
CENTRAL SECTOR
Total of CENTRAL SECTOR
STATE SECTOR Sector
Total of STATE SECTOR
File NoCEA-CH-14-1142018-Coordination Division
SN Contents Page
1 Executive summary of Target and Achievement of Substations during 2018-19 21(1)
2Sub Stations (220 kV and above) commissionedready for commisssioning during Oct-
201821(2)
Section D - Sub Stations
File NoCEA-CH-14-1142018-Coordination Division
1 Executive summary of Target and Achievement of Substations during 2018-19 As on Oct-18
(All figures in circuit MVA)
Centr
al S
ecto
r
Sta
te S
ecto
r
JV
Private
Secto
r
To
tal
Centr
al S
ecto
r
Sta
te S
ecto
r
JV
Private
Secto
r
To
tal
Centr
al S
ecto
r
Sta
te S
ecto
r
JV
Private
Secto
r
To
tal
Centr
al S
ecto
r
Sta
te S
ecto
r
JV
Private
Secto
r
To
tal
Centr
al S
ecto
r
Sta
te S
ecto
r
JV
Private
Secto
r
To
tal
Cen
tral S
ecto
r
Sta
te S
ecto
r
JV
Pri
vate
Secto
r
Gra
nd
To
tal
3000 0 0 3000 0 0 0 0 22200 0 0 22200 8185 13085 630 21900 740 14760 0 15500 34125 27845 630 62600
Oct18 Programme 0 0 0 0 0 0 0 0 0 0 0 0 1000 1260 630 2890 0 1400 0 1400 1000 2660 630 4290
Achievement 0 0 0 0 0 0 0 0 3000 0 0 3000 1500 3120 0 4620 0 2220 0 2220 4500 5340 0 9840
Upto Oct-18 Programme 0 0 0 0 0 0 0 0 10000 0 0 10000 6130 7435 630 14195 0 9670 0 9670 16130 17105 630 33865
Achievement 0 0 0 0 0 0 0 0 14000 0 0 14000 9000 7550 630 17180 0 10610 0 10610 23000 18160 630 41790
21(1)
220 kV Grand Total 800 kV 500 kV
Programme 2018-19
Programme
Achievement
HVDC765 kV 400 kV
File NoCEA-CH-14-1142018-Coordination Division
As on 31-10-18
Sl Voltage Ratio Capacity
No (kVkV) (MWMVA)
1 2 3 4 5
1 Cuddapah Ss 765400 PGCIL 3000
2 Tughlakabad SS (GIS) 400220 PGCIL 1500
Total of CENTRAL SECTOR 4500
3 Panki Kanpur (Aug) TF-I 400200 UPPTCL 75
4 Hindupur ss (1st ICT) 400220 APTRANSCO 315
5 Thappagundu ss 400110 TANTRANSCO 600
6 Mendhasal (2nd power TF) 400220 OPTCL 20
7 Jodhpur ss (New) 400220 RVPNL 315
8 Shankarpally 400220 TSTRANSCO 500
9 Podili ss (1st ICT) 400220 APTRANSCO 315
10 Doni (Gadag)SS 400220 KPTCL 1000
11 Porur (Addl TF) 230110 TANTRANSCO 100
12 Anuppankulam (Addl TF) 230110 TANTRANSCO 60
13 Neyveli SS 230110 TANTRANSCO 480
14 Savarkundla (Aug) 22066 GETCO 60
15 Bhuna (Aug) 220132 HVPNL 100
16 Madanpur (Aug) 22066 HVPNL 100
17 Gurgaon Sec-52A (Aug) 22066 HVPNL 160
18 IA Hisar (Aug) 220132 HVPNL 50
19 Narwana (Aug) 220132 HVPNL 60
20 Therubali (3rd Auto TF) 220132 OPTCL 160
21 Halasar ss 220132 RVPNL 160
22 Bansi Siddaharthnagar (Aug) TF-I 220132 UPPTCL 60
23 Hata Kushinagar (New) TF-I 220132 UPPTCL 100
24 Gomti nagar Lucknow (Aug) TF-IV 22033 UPPTCL 60
25 Kanpur Road Lucknow (New) TF-III 22033 UPPTCL 60
26 Asoj (Aug) 22066 GETCO 150
27 Kangasiyali (Aug) 22066 GETCO 60
28 Karmsad (Aug) 22066 GETCO 160
29 Lalpar (Aug) 22066 GETCO 60
TOTAL STATE SECTOR 5340
GRAND TOTAL 9840
21(2)
PRIVATE SECTOR
CENTRAL SECTOR
STATE SECTOR
2Sub-Stations (220 kV and above) CommissionedReady for commissioning During Oct-2018
Name of Sub StationsExecuting
Agency
File NoCEA-CH-14-1142018-Coordination Division
SN Contents Page
1 Electricity Generation (MU) Targets and Achievements for 2018-19 22
Section E - Electricity Generation
File NoCEA-CH-14-1142018-Coordination Division
Programme Achievement Ach Programme Achievement Ach
Central Sector 35160700 3028100 3162321 10443 20144400 21150469 10499
State Sector 35132000 3010000 3017260 10024 19922100 19549030 9813
PvtIPP Sector 36999700 3240600 3375603 10417 21598300 20794155 9628
PvtUTL Sector 1857600 164500 180597 10979 1130900 1203107 10638
Total 109150000 9443200 9735781 10310 62795700 62696761 9984
Central Sector 5617600 420900 451004 10715 4193000 4045436 9648
State Sector 6110600 559500 708469 12663 4049400 4433000 10947
PvtIPP Sector 1141800 80500 90122 11195 976400 1021963 10467
PvtUTL Sector 130000 11300 12564 11119 76700 99943 13030
Total 13000000 1072200 1262159 11772 9295500 9600342 10328
Central Sector 3850000 353300 303310 8585 2068900 2203540 10651
Total 3850000 353300 303310 8585 2068900 2203540 10651
Bhutan Import 500000 63300 35395 5592 347000 416660 12007
Central Sector 44628300 3802300 3916635 10301 26406300 27399445 10376
State Sector 41242600 3569500 3725729 10438 23971500 23982030 10004
Pvt Sector 40129100 3496900 3658886 10463 23782300 23119168 9721
Total 126500000 10932000 11336645 10370 74507100 74917303 10055
Provisional based on actual-cum-Assesment
Figs in MU
Cummulative
Achievement
Cummulative
Achievement
Sep-18 Sep-17 Upto Sep-2018 Upto Sep-2017
1073794 748889 7332680 5660929
22
Renewable Energy Generation
Achievement
Oct-2018
1 Electricity Generation (MU) Targets and Achievememts for 2018-19
All India Energy Generation During April 2018- Oct 2018 (MU)
Target (2018-19)April 2018- Oct 2018
Sector
Hydro
Thermal
Nuclear
627957
92955
20689
745071
626968
96003
22035
749173
0
100000
200000
300000
400000
500000
600000
700000
800000
Thermal Hydro Nuclear Total
Programme
Achievement
File NoCEA-CH-14-1142018-Coordination Division
SN Contents Page
1 Energy Power Supply Position (Provisional) for Oct-2018 and during April 2018- Oct 2018 23
2 Peak Power Supply Position (Provisional) for Oct-2018 and during April 2018- Oct 2018 24
3 Energy Power Supply Position (Revised) for Sep-2018 and during April 2018- Sept 2018 25
4 Peak Power Supply Position (Revised) for Sep-2018 and during April 2018- Sept 2018 26
5 Notified Power cuts Restrictions on Industries during Oct-2018 27
6 Power Supply to Agricultural Sector during Oct-2018 28
Section F - Power supply position
File NoCEA-CH-14-1142018-Coordination Division
आकड़ मममलयन यननट नट Figures in MU net
ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied
कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )
चडीगढ़ Chandigarh 108 108 0 00 1055 1055 0 00
दिलली Delhi 2490 2489 1 00 22524 22510 14 01
हरियजणज Haryana 4554 4554 0 00 35205 35205 0 00
दहमजचल परिश Himachal Pradesh 788 787 2 02 5728 5560 168 29
रमम कशमीि Jammu amp Kashmir 1497 1219 278 186 10982 8865 2117 193
परजब Punjab 4418 4418 0 00 38832 38819 13 00
िजरसथजन Rajasthan 6748 6748 0 00 45341 45181 160 04
उतति परिश Uttar Pradesh 10136 9973 164 16 75485 74808 676 09
उततिजखड Uttarakhand 1083 1081 3 03 8395 8310 85 10
उततरी कषतर Northern Region 31822 31375 447 14 243547 240314 3233 13
छततीसगढ़ Chhattisgarh 2454 2453 1 00 16119 16091 28 02
गरिजत Gujarat 11636 11636 0 00 70782 70768 14 00
मधय परिश Madhya Pradesh 5860 5859 1 00 38412 38410 2 00
महजिजषटर Maharashtra 15223 15095 128 08 95489 95355 134 01
िमन औि दिउ Daman amp Diu 216 216 0 00 1523 1523 0 00
िजिि व नगि हवली Dadra amp Nagar Haveli 553 553 0 00 3757 3757 0 00
गोवज Goa 366 366 0 00 2497 2495 2 01
पशचिमी कषतर Western Region 36308 36178 130 04 228579 228398 180 01
आनधर परिश Andhra Pradesh 5860 5854 6 01 37377 37334 43 01
तलगजनज Telangana 6748 6742 6 01 38251 38205 46 01
कनजाटक Karnataka 5842 5835 7 01 39111 39059 52 01
किल Kerala 2116 2096 20 09 14256 14160 96 07
तममल नजड Tamil Nadu 8611 8601 10 01 65742 65666 76 01
पडचिी Puducherry 216 215 1 05 1654 1646 8 05
लकष-दवीप Lakshadweep 4 4 0 0 27 27 0 0
दकषकषणी कषतर Southern Region 29392 29342 50 02 196390 196069 321 02
बबहजि Bihar 2742 2738 4 01 19143 18951 192 10
िजमोिि घजटी ननगम DVC 1712 1698 13 08 13096 12828 268 20
झजिखणड Jharkhand 701 697 4 06 5022 4949 73 15
ओडडशज Odisha 3147 3134 13 04 20224 20192 32 02
पशशचम बगजल West Bengal 4204 4200 4 01 33008 32881 127 04
मसशककम Sikkim 40 40 0 00 279 279 0 01
अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 67 202 188 13 67
परवी कषतर Eastern Region 12547 12507 40 03 90772 90080 692 08
अरणजचल परिश Arunachal Pradesh 67 66 1 09 502 496 7 13
असम Assam 833 809 24 29 6153 5903 250 41
मणणपि Manipur 72 71 1 10 485 478 7 14
मघजलय Meghalaya 147 147 0 00 1043 1042 0 00
ममज़ोिम Mizoram 63 62 1 08 365 359 5 14
नजगजलड Nagaland 76 67 8 110 540 481 59 109
बिपिज Tripura 130 129 1 09 1025 1007 19 18
उततर-परवी कषतर North-Eastern Region 1387 1351 35 25 10113 9766 346 34
समपणण भारत All India 111455 110753 702 06 769399 764627 4773 06
23
ऊराण वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Energy Power Supply Position Report (Provisional)
राजयStateअकरबर2018 October2018 अपरल2018 -अकरबर2018 April2018 to October2018
ऊरजा पनत ा म कमी ऊरजा पनत ा म कमीEnergy not Supplied
Excludes energy exported to Bangladesh
Energy not Supplied
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
File NoCEA-CH-14-1142018-Coordination Division
अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met
कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )
चडीगढ़ Chandigarh 217 217 0 00 369 369 0 00
दिलली Delhi 4713 4713 0 00 7016 7016 0 00
हरियजणज Haryana 7948 7948 0 00 10270 10270 0 00
दहमजचल परिश Himachal Pradesh 1520 1520 0 00 1520 1520 0 00
रमम कशमीि Jammu amp Kashmir 2836 2269 567 200 2951 2361 590 200
परजब Punjab 7979 7979 0 00 12638 12638 0 00
िजरसथजन Rajasthan 11450 11450 0 00 11698 11698 0 00
उतति परिश Uttar Pradesh 17434 16745 688 39 20498 20062 436 21
उततिजखड Uttarakhand 1943 1943 0 00 2143 2143 0 00
उततरी कषतर Northern Region 50659 49635 1024 20 63166 61726 1440 23
छततीसगढ़ Chhattisgarh 4414 4268 146 33 4414 4268 146 33
गरिजत Gujarat 18148 18130 19 01 18148 18130 19 01
मधय परिश Madhya Pradesh 11356 11317 39 03 11356 11317 39 03
महजिजषटर Maharashtra 23864 23159 705 30 23864 23254 610 26
िमन औि दिउ Daman amp Diu 342 341 1 02 357 356 1 02
िजिि व नगि हवली Dadra amp Nagar Haveli 784 780 4 05 816 815 1 01
गोवज Goa 536 536 0 00 596 596 0 00
पशचिमी कषतर Western Region 56548 55695 853 15 56548 55695 853 15
आनधर परिश Andhra Pradesh 9435 9435 0 00 9435 9435 0 00
तलगजनज Telangana 10603 10603 0 00 10815 10815 0 00
कनजाटक Karnataka 10741 10741 0 00 10741 10741 0 00
किल Kerala 3727 3644 83 22 4050 3997 53 13
तममल नजड Tamil Nadu 14747 14333 414 28 15029 14981 47 03
पडचिी Puducherry 363 362 1 03 420 400 19 46
लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0
दकषकषणी कषतर Southern Region 45279 45226 53 01 45946 45684 262 06
बबहजि Bihar 4945 4945 0 00 5050 5045 5 01
िजमोिि घजटी ननगम DVC 2729 2729 0 00 2874 2874 0 00
झजिखणड Jharkhand 1260 1260 0 00 1339 1284 55 41
ओडडशज Odisha 5624 5224 400 71 5624 5357 268 48
पशशचम बगजल West Bengal 8775 8775 0 00 9130 9123 7 01
मसशककम Sikkim 86 86 0 00 90 90 0 00
अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7
परवी कषतर Eastern Region 22959 22567 392 17 22959 22567 392 17
अरणजचल परिश Arunachal Pradesh 138 125 13 94 138 133 5 37
असम Assam 1785 1704 81 45 1865 1809 56 30
मणणपि Manipur 187 185 2 11 193 186 7 36
मघजलय Meghalaya 336 336 0 00 371 368 2 07
ममज़ोिम Mizoram 99 97 2 20 103 98 4 41
नजगजलड Nagaland 134 131 3 22 156 138 18 117
बिपिज Tripura 269 269 0 00 298 293 5 17
उततर-परवी कषतर North-Eastern Region 2790 2700 90 32 2967 2850 117 39
समपणण भारत All India 172945 170604 2341 14 177022 175528 1494 08
24
अधिकतम वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Peak Power Supply Position Report (Provisional)
आकड़ मगज वजट नट Figures in MW netअपरल2018 -अकरबर2018 April2018 to October2018
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
मजग की पनता म कमी Demand not Met
Excludes the supply to Bangladesh
राजयStateअकरबर2018 October2018
मजग की पनता म कमी Demand not Met
File NoCEA-CH-14-1142018-Coordination Division
आकड़ मममलयन यननट नट Figures in MU net
ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied
कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )
चडीगढ़ Chandigarh 141 141 0 00 947 947 0 00
दिलली Delhi 2925 2924 1 00 20034 20021 13 01
हरियजणज Haryana 4794 4794 0 00 30651 30651 0 00
दहमजचल परिश Himachal Pradesh 876 853 24 27 4940 4773 167 34
रमम कशमीि Jammu amp Kashmir 1520 1246 274 180 9485 7646 1839 194
परजब Punjab 5575 5575 0 00 34414 34401 13 00
िजरसथजन Rajasthan 6202 6201 0 00 38594 38434 160 04
उतति परिश Uttar Pradesh 10211 10124 86 08 65349 64836 513 08
उततिजखड Uttarakhand 1162 1149 13 11 7311 7229 82 11
उततरी कषतर Northern Region 33405 33008 398 12 211725 208939 2786 13
छततीसगढ़ Chhattisgarh 2403 2388 15 06 13665 13638 27 02
गरिजत Gujarat 10122 10122 0 00 59146 59132 14 00
मधय परिश Madhya Pradesh 5492 5491 1 00 32552 32551 1 00
महजिजषटर Maharashtra 13615 13612 3 00 80266 80260 6 00
िमन औि दिउ Daman amp Diu 221 221 0 00 1306 1306 0 00
िजिि व नगि हवली Dadra amp Nagar Haveli 551 551 0 00 3204 3204 0 00
गोवज Goa 339 339 0 00 2131 2128 2 01
पशचिमी कषतर Western Region 32742 32723 19 01 192270 192220 50 00
आनधर परिश Andhra Pradesh 5294 5287 7 01 31518 31480 37 01
तलगजनज Telangana 6279 6272 8 01 31503 31463 40 01
कनजाटक Karnataka 5701 5693 8 01 33269 33225 45 01
किल Kerala 2050 2026 24 12 12140 12063 76 06
तममल नजड Tamil Nadu 8971 8959 12 01 57131 57065 66 01
पडचिी Puducherry 226 224 2 08 1438 1431 7 05
लकष-दवीप Lakshadweep 4 4 0 0 23 23 0 0
दकषकषणी कषतर Southern Region 28520 28460 60 02 166998 166727 271 02
बबहजि Bihar 2839 2793 46 16 16400 16213 188 11
िजमोिि घजटी ननगम DVC 1901 1750 151 79 11384 11130 254 22
झजिखणड Jharkhand 740 723 17 22 4321 4252 69 16
ओडडशज Odisha 2921 2918 3 01 17077 17058 19 01
पशशचम बगजल West Bengal 4902 4879 23 05 28804 28681 123 04
मसशककम Sikkim 39 39 0 01 239 239 0 01
अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 67 173 162 12 67
परवी कषतर Eastern Region 13341 13102 240 18 78225 77573 652 08
अरणजचल परिश Arunachal Pradesh 74 73 1 10 435 429 6 14
असम Assam 950 914 36 38 5320 5094 226 43
मणणपि Manipur 70 69 1 11 414 408 6 15
मघजलय Meghalaya 150 150 0 01 896 896 0 01
ममज़ोिम Mizoram 58 57 1 12 302 297 5 16
नजगजलड Nagaland 80 72 8 104 464 414 50 108
बिपिज Tripura 192 191 1 07 895 878 17 19
उततर-परवी कषतर North-Eastern Region 1575 1527 48 31 8726 8415 311 36
समपणण भारत All India 109584 108819 765 07 657944 653873 4071 06
Energy not Supplied Energy not Supplied
ससतबर2018 September2018 अपरल2018 -ससतबर2018 April2018 to September2018
ऊरजा पनत ा म कमी ऊरजा पनत ा म कमी
Excludes energy exported to Bangladesh
राजयState
ऊराण वरवदयत आपरतण शथिरत ररपोरण (सशोधित) Energy Power Supply Position Report (Revised)
25
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
File NoCEA-CH-14-1142018-Coordination Division
अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met
कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )
चडीगढ़ Chandigarh 293 293 0 00 369 369 0 00
दिलली Delhi 5358 5358 0 00 7016 7016 0 00
हरियजणज Haryana 9008 9008 0 00 10270 10270 0 00
दहमजचल परिश Himachal Pradesh 1466 1466 0 00 1479 1479 0 00
रमम कशमीि Jammu amp Kashmir 2951 2361 590 200 2951 2361 590 200
परजब Punjab 11405 11405 0 00 12638 12638 0 00
िजरसथजन Rajasthan 10612 10612 0 00 11698 11698 0 00
उतति परिश Uttar Pradesh 18346 18121 225 12 20498 20062 436 21
उततिजखड Uttarakhand 1996 1996 0 00 2143 2143 0 00
उततरी कषतर Northern Region 56407 55649 758 13 63166 61726 1440 23
छततीसगढ़ Chhattisgarh 4404 4075 328 75 4404 4136 268 61
गरिजत Gujarat 16963 16963 0 00 17053 16963 90 05
मधय परिश Madhya Pradesh 8811 8771 41 05 8811 8775 36 04
महजिजषटर Maharashtra 22455 22349 106 05 23395 23254 141 06
िमन औि दिउ Daman amp Diu 357 356 1 02 357 356 1 02
िजिि व नगि हवली Dadra amp Nagar Haveli 816 815 1 01 816 815 1 01
गोवज Goa 596 596 0 00 596 596 0 00
पशचिमी कषतर Western Region 52933 52895 38 01 53841 52895 945 18
आनधर परिश Andhra Pradesh 9435 9416 19 02 9435 9416 19 02
तलगजनज Telangana 10815 10815 0 00 10815 10815 0 00
कनजाटक Karnataka 10103 10090 13 01 10690 10688 2 00
किल Kerala 3888 3638 251 64 4050 3997 53 13
तममल नजड Tamil Nadu 14556 14553 3 00 15029 14981 47 03
पडचिी Puducherry 390 372 17 45 420 400 19 46
लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0
दकषकषणी कषतर Southern Region 45542 45428 114 02 45946 45684 262 06
बबहजि Bihar 5050 5045 5 01 5050 5045 5 01
िजमोिि घजटी ननगम DVC 2641 2641 0 00 2874 2874 0 00
झजिखणड Jharkhand 1233 1233 0 00 1339 1284 55 41
ओडडशज Odisha 4906 4906 0 00 5357 5357 0 00
पशशचम बगजल West Bengal 8644 8639 5 01 9130 9123 7 01
मसशककम Sikkim 78 78 0 00 90 90 0 00
अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7
परवी कषतर Eastern Region 22110 22100 10 00 22470 22290 180 08
अरणजचल परिश Arunachal Pradesh 132 130 2 15 138 133 5 37
असम Assam 1865 1809 56 30 1865 1809 56 30
मणणपि Manipur 184 182 2 13 193 186 7 36
मघजलय Meghalaya 317 317 0 00 371 368 2 07
ममज़ोिम Mizoram 95 93 2 23 103 98 4 41
नजगजलड Nagaland 142 138 5 32 156 138 18 117
बिपिज Tripura 296 293 3 10 298 293 5 17
उततर-परवी कषतर North-Eastern Region 2921 2850 71 24 2967 2850 117 39
समपणण भारत All India 177022 175528 1494 08 177022 175528 1494 08
26
मजग की पनता म कमी मजग की पनता म कमी Demand not MetDemand not Met
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
Excludes the supply to Bangladesh
अधिकतम वरवदयत आपरतण शथिरत ररपोरण (सशोधित) Peak Power Supply Position Report (Revised)
आकड़ मगज वजट नट Figures in MW net
राजयStateससतबर2018 September2018 अपरल2018 -ससतबर2018 April2018 to September2018
File NoCEA-CH-14-1142018-Coordination Division
अकरबर2018 October2018अपरल2018 -अकरबर2018 April2018 to October2018
उततरी कषतर Northern Region
चडीगढ़ Chandigarh Data not received Data not received
दिलली Delhi
हरियजणज Haryana
दहमजचल परिश Himachal Pradesh
रमम कशमीि Jammu amp Kashmir Data not received Data not received
परजब Punjab
िजरसथजन Rajasthanउतति परिश Uttar Pradesh
उततिजखड Uttarakhand
पशचिमी कषतर Western Region
छततीसगढ़ Chhattisgarh
गरिजत Gujarat
मधय परिश Madhya Pradesh
महजिजषटर Maharashtra
गोवज Goa
दकषकषणी कषतर Southern Region
आनधर परिश Andhra Pradesh
तलगजनज Telangana
कनजाटक Karnataka
किल Kerala
तममल नजड Tamil Nadu
पडचिी Puducherryपरवी कषतर Eastern Region
बबहजि Bihar
झजिखणड Jharkhand
ओडडशज Odisha
पशशचम बगजल West Bengal
N
o No
tified
Cuts
N
o No
tified
Cuts
27
अकरबर 2018 म इडथरीर पर वरवदयत करौती का वरवरवरण Notified Power CutsRestrictions on Industries during October2018
राजय कषतर State Regionऊराणमाग करौती EnergyDemand Cut
No Notified Cuts No Notified Cuts
File NoCEA-CH-14-1142018-Coordination Division
अकरबर2018 October2018अपरल2018 -अकरबर2018 April2018 to October2018
उततरी कषतर Northern Region
चडीगढ़ Chandigarh Data not received Data not received
दिलली Delhi Data not received Data not received
हरियजणज Haryana 940 hrsday 0709 - 0950 hrsday
दहमजचल परिश Himachal Pradesh No cut imposed on agriculture consumers and uninterrupted
power is being supplied to agriculture sector
HPSEBL has only 2 agriculture consumers and uninterrupted
power is being supplied to agriculture sector
रमम कशमीि Jammu amp Kashmir Data not received Data not received
परजब Punjab 0507 hrsday 0349 - 0844 hrsday
िजरसथजन Rajasthan 0630 hrsday 0630 hrsday
उतति परिश Uttar Pradesh 1825 hrsday 1814 - 1858 hrsday
उततिजखड Uttarakhand 2350 hrsday 2128 - 2357 hrsday
पशचिमी कषतर Western Region
छततीसगढ़ Chhattisgarh 18hoursday 18 hrsday
गरिजत Gujarat 805 hrsday 805 hrsday
मधय परिश Madhya Pradesh Three-Phase Supply(Irrigation)-947 hrs day
Three-Phase (Mixed) Supply - 2311 hrs day
Three-Phase Supply(Irrigation)- 0933 - 0947 hrs day Three-
Phase (Mixed) Supply - 2300 - 2320 hrs day
महजिजषटर Maharashtra Three-Phase Supply(Irrigation)- 9 hrs day
Three-Phase (Mixed) Supply - 24 hrs day
Three-Phase Supply(Irrigation)- 9 hrs day
Three-Phase (Mixed) Supply - 24 hrs day
गोवज Goa No restriction No restriction
दकषकषणी कषतर Southern Region
आनधर परिश Andhra Pradesh 07 hrsday 07 hrsday
तलगजनज Telangana 24 hoursday 24 hoursday
कनजाटक Karnataka 6 hrsday 6 hrsday
किल Kerala No Restrictions No Restrictions
तममल नजड Tamil Nadu 9 hrsday (6 hrs during day time and 3 hrs during night time) 9 hrsday (6 hrs during day time and 3 hrs during night time)
पडचिी Puducherry No Restrictions No Restrictions
परवी कषतर Eastern Region
बबहजि Bihar About 18 hrsday About 18 hrsday
झजिखणड Jharkhand About 20 hrsday About 20 hrsday
ओडडशज Odisha 24 hrsday 24 hrsday
पशशचम बगजल West Bengal About 23 hrsday About 23 hrsday
28
अकटबर 2018 कषि कषतर को षिदयत आपरति का षििरण Power Supply to Agricultural Sector during October2018
राजय कषतर State Regionऔसत वरवदयत आपरतण घनरो म Average Hours of Supply
On segregated feeders
File NoCEA-CH-14-1142018-Coordination Division
SNo Contents Page
1 Growth of Installed Capacity since 6th Plan 29
2 Progress of Transmission Sector since 6th Plan 30
3 All India Yearly Coal consumption for Power Generation (Utilities)
4 All India Annual Per Capita Consumption of Electricity since -2006
5 Average cost of power supply amp Average realisation (Paisakwh)
6 Growth of Rural Electrification amp Pump Sets Energisation
7 Status of Hydro Schemes Cleared by the CEA in Oct-2018
Section G - Growth of Power Sector
31
32
File NoCEA-CH-14-1142018-Coordination Division
(In MW)
Coal Gas Diesel Total
End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472
End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634
End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537
End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596
End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921
End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703
End of 12th Plan 19216288 2532938 83763 21832988 6780 4447842 50018 31960630
Up to Oct-2018 19599250 2493722 837629 22176734 6780 4548742 7201281 34604757
Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-17) = 51529 MW
Electricity Generation (MU) Targets and Achievements for 2016-17
Coal Gas Diesel Nuclear Hydro Res Total
1959925 2493722 837629 678000 454874 72012805 22925174
29
1 Growth of Installed Capacity Since 6th Plan
Plan YearThermal
Nuclear Hydro RES (MNRE) Total
Total Installed Capacity 34604757 MW
Coal Gas Diesel Nuclear Hydro Res
File NoCEA-CH-14-1142018-Coordination Division
Progress of Transmission Sector in the Country up to Oct 2018
1 TRANSMISSION LINES (All fig in CKM)
At the end of
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
6th plan 0 0 0 0 0 0 0 0 0 0 0 0 1831 4198 0 6029 1641 44364 0 46005 3472 48562 0 52034
7th plan 0 0 0 0 0 0 0 0 0 0 0 0 13068 6756 0 19824 4560 55071 0 59631 17628 61827 0 79455
8th plan 0 0 0 0 1634 0 0 1634 0 0 0 0 23001 13141 0 36142 6564 73036 0 79600 31199 86177 0 117376
9th plan 0 0 0 0 3234 1504 0 4738 751 409 0 1160 29345 20033 0 49378 8687 88306 0 96993 42017 110252 0 152269
10th plan 0 0 0 0 4368 1504 0 5872 1775 409 0 2184 48708 24730 0 73438 9444 105185 0 114629 64295 131828 0 196123
11th Plan 0 0 0 0 5948 1504 1980 9432 4839 411 0 5250 71023 30191 5605 106819 10140 125010 830 135980 91950 157116 8415 257481
12th Plan 6124 0 0 6124 5948 1504 1980 9432 25465 1177 4598 31240 92482 48240 17065 157787 11014 151276 978 163268 141033 202197 24621 367851
13th Plan (Up
to Mar2018)6124 0 0 6124 5948 1504 1980 9432 28666 1512 4881 35059 98247 54286 19067 171600 11258 156497 1000 168755 150243 213799 26928 390970
13th Plan (Up
to Sep-18)6124 0 0 6124 5948 1504 1980 9432 30952 1512 5059 37523 99683 56069 20662 176414 11318 160958 1000 173276 154025 220043 28701 402769
27150
75050
47900
118050
90650
30
IR addition in 12th Plan (up to
March 2017)
Total IR (up to Oct-18)
IR at the end of 11th Plan
IR at the end of 12th Plan
Envisaged IR Capacity at the end
of 13th Plan
Grand Total
Note - The figure upto the end of 10th plan in for stringing progress including the lines not commissioned Now only commissioned lines are reckoned Accordingly the figure for 10th plan (end) may read as 187555 after adjusting with (-) 10852 Ckm
Inter-regional Power Transfer Capacity
plusmn 800 kV HVDC plusmn 500 kV HVDC 765 kV 400 kV 220 kV
File NoCEA-CH-14-1142018-Coordination Division
2004-05 27800
2005-06 28100
2006-07 30200
2007-08 33000
2008-09 35500
2009-10 36700
2010-11 38700
2011-12 41756
2012-13 45460
2013-14 48940
2014-15 53040
2015-16 54590
2016-17 57430
2017-18 60800
Year
2005-06
2006-07
2007-08
2008-09
2009-10
2010-11
2011-12
2012-13
2013-14
2014-15
2015-16
2016-17
2017-18
2004-05 254 209 7568
2005-06 260 221 7636
2006-07 276 227 7423
2007-08 293 239 7727
2008-09 340 263 8713
2009-10 355 268 8870
2010-11 398 303 11975
2011-12 455 330 13514
2012-13 501 376 14867
2013-14 518 175
2014-15 520
6719
7171
3 All India yearly Coal Consumption for Power Generation (Utilities)
YEARCoal Consumption
Million Tonnes
4 All India Annual per Capita consumption of Electricity Since 2006
Per Capita Consumption ( kWh)
6314
(GrossGen+ Net Import) Mid-year population
5 Average cost of power supply amp average realization ( paiseKWH )
Yearcost of supply
(paiseunit)
Realization(paiseunit)
Including AgricultureOnly
Agriculture
1149
7335
7786
91441
8188
88363
957
1010
1075
1122
File NoCEA-CH-14-1142018-Coordination Division
Source- PFC Reports on the performance of State Power Utilities 31
File NoCEA-CH-14-1142018-Coordination Division
Sl
NoExecuting Agency
Installed
Capacity (MW)Cost (Rs crore)
Date of
Clearance
32
No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification
since 2004-05
65291374575 296361511th Plan
Cumu upto End of 11th Plan
596556 21212860
557439Cummulative up to end of 12th Plan
46708
18423975
499150
2003-042004-05
5743
9769
Cumu upto End of 10th Plan
010407 to 310308
010410 to 310311557976840909
010411 to 310312
412667
86293726
3207
482864
12632
1576036
4451722594
15455554
2314176
397343611750
2093311060316074
65109527813884
6 Growth Of Rural Electrification amp Pumpsets Energisation
Plan Year
9th Plan2002-03
134092626
4111
Pump Sets Energised Villages Electricfied (Nos)
2001-02
284064367244
1218
27801997-981998-991999-002000-01
297594
010408 to 310309010409 to 310310
10th Plan
2005-062006-07
322968331020
Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as
Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received
from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made
available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified
villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is
independent of the earlier published reports
No Hydro Electric Project has been issued concurrenceAppraisal letter by CEA during October 2018
7 Status of Hydro Schemes Cleared by the CEA in Oct-2018
Name of Scheme
File NoCEA-CH-14-1142018-Coordination Division
SN Contents Page
1 Rate of sale of power for the year 2016-17 33-41
RATE OF SALE OF POWER FOR THE YEAR 2016-17
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) NORTHERN REGION
CENTRAL SECTOR
BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 18000 66900 19800
CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 54000 222400 21600
CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 30000 144400 19600
CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 23100 91700 42600
PARBATI - III HPS NHPC LTD HYDRO-HYDRO 52000 68200 54800
DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 28000 95600 30000
CHUTAK NHPC LTD HYDRO-HYDRO 4400 22000 79800
DULHASTI HPS NHPC LTD HYDRO-HYDRO 39000 228000 56400
SALAL HPS NHPC LTD HYDRO-HYDRO 69000 342300 11000
TANAKPUR HPS NHPC LTD HYDRO-HYDRO 9420 43000 29600
URI HPS -I NHPC LTD HYDRO-HYDRO 48000 280300 16000
URI HPS - II NHPC LTD HYDRO-HYDRO 24000 147300 48600
NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 4500 24600 88200
SEWA - II NHPC LTD HYDRO-HYDRO 12000 47100 43400
ANTA CCPP NTPC LTD THERMAL-GASN 41930 67539 32400
AURAIYA CCPP NTPC LTD THERMAL-GASN 66336 53501 39100
BADARPUR TPS NTPC LTD THERMAL-COAL 70500 159153 44800
DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 84000 296170 42300
DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 98000 526686 46300
DADRI CCPP NTPC LTD THERMAL-GASHSD 82978 227469 33000
FARIDABAD CCPP NTPC LTD THERMAL-GASN 43159 115577 30800
RIHAND STPS I NTPC LTD THERMAL-COAL 100000 596766 24500
RIHAND STPS II NTPC LTD THERMAL-COAL 100000 737069 24600
RIHAND STPS III NTPC LTD THERMAL-COAL 100000 706546 30600
SINGRAULI STPS NTPC LTD THERMAL-COAL 200000 1394068 20400
TANDA TPS NTPC LTD THERMAL-COAL 44000 295438 40800
UNCHAHAR TPS I NTPC LTD THERMAL-COAL 42000 256454 39800
UNCHAHAR TPS II NTPC LTD THERMAL-COAL 42000 273577 38900
UNCHAHAR TPS III NTPC LTD THERMAL-COAL 21000 142780 43000
KOLDAM NTPC LTD HYDRO-HYDRO 80000 363260 43600
NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 303575 25841
RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 108000 668677 35374
NJHPS SJVNL HYDRO-HYDRO 150000 699496 23820
RAMPUR HPS SJVNL HYDRO-HYDRO 41202 195982 32260
TEHRI HPP THDC HYDRO-HYDRO 100000 272543 51800
KOTESHWAR HEP THDC HYDRO-HYDRO 40000 106244 53400
IGSTPS JHAJJAR ARAVALI P CPL THERMAL-COAL 150000 510429 49490
NEYVELI BARSINGSAR NEYVELI LIG CORP LTD THERMAL-LIG 25000 127520 38040
STATE SECTOR
PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 21000 14222 48200
PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 21000 19205 48400
PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 25000 102257 42600
PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 25000 62107 41800
DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 60000 312213 41000
RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 120000 35767442200
WYC HYDEL STATION HPGCL HYDRO-HYDRO 6240 20365 24900
GIRI POWER HOUSE HPSEB HYDRO-HYDRO 6000 13958 7600
ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 1695 5467 11900
BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 12000 18528 6700
GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 2250 7462 22500
BASSI POWER HOUSE HPSEB HYDRO-HYDRO 6600 29649 7500
BINWA POWER HOUSE HPSEB HYDRO-HYDRO 600 2749 19300
ANNEXURE-I
RATE OF SALE OF POWER FOR THE YEAR 2016-2017
Page 33
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) GAJ POWER HOUSE HPSEB HYDRO-HYDRO 1050 2914 26700
BANER POWER HOUSE HPSEB HYDRO-HYDRO 1200 2864 16200
HOLI POWER HOUSE HPSEB HYDRO-HYDRO 300 616 22500
THIROT POWER HOUSE HPSEB HYDRO-HYDRO 450 1126 22500
KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 1200 3064 22500
LARJI POWER HOUSE HPSEB HYDRO-HYDRO 12600 53677 23700
NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 250 750 31000
CHABA POWER HOUSE HPSEB HYDRO-HYDRO 175 465 23300
RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 150 101 13400
SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 200 000 22500
KILLAR HPSEB HYDRO-HYDRO 030 050 22500
BHABA AUGUMENP H HPSEB HYDRO-HYDRO 450 1276 22500
BS CHAMBA HPSEB HYDRO-HYDRO 045 099 19500
GUMMA HPSEB HYDRO-HYDRO 300 423 22500
GAS TURBINE POWER STATION IPGCL THERMAL-GAS 27000 67233 39300
PPS-I PPCL THERMAL-GAS 33000 175905 38300
PPS-III PPCL THERMAL-GAS 137120 196879 36100
LOWER JHELUM JampKPDD HYDRO-HYDRO 10500 60214 5100
UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 2260 10514 6300
UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 10500 44202 8500
GANDHARBAL JampKPDD HYDRO-HYDRO 1500 8925 4700
KARNAH MPH JampKPDD HYDRO-HYDRO 200 1122 31000
CHENANI I JampKPDD HYDRO-HYDRO 2330 10892 6600
CHENANI II JampKPDD HYDRO-HYDRO 200 1188 9300
CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 750 3634 14200
IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 375 2108 18500
IGO MERCHELLONG JampKPDD HYDRO-HYDRO 300 1572 29700
PAHALGAM MHP JampKPDD HYDRO-HYDRO 450 1713 32900
MARPACHOO JampKPDD HYDRO-HYDRO 075 375 29800
HAFTAL JampKPDD HYDRO-HYDRO 100 483 28700
SANJAK JampKPDD HYDRO-HYDRO 126 441 36000
SEWA-III JampKPDD HYDRO-HYDRO 900 3273 20200
BHADERWAH JampKPDD HYDRO-HYDRO 150 935 8900
BAZGO JampKPDD HYDRO-HYDRO 030 108 33300
SUMOOR JampKPDD HYDRO-HYDRO 010 045 35400
HUNDER JampKPDD HYDRO-HYDRO 040 176 26200
STAKNA JampKPDD HYDRO-HYDRO 400 1933 4100
KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 124000 662879 31360
SURATGARH TPS RRVUNL THERMAL-COAL 150000 402328 41730
CHHABRA TPS 1amp 2 RRVUNL THERMAL-COAL 50000 305946 36700
CHHABRA TPS 3 RRVUNL THERMAL-COAL 25000 151536 36700
CHHABRA TPS 4 RRVUNL THERMAL-COAL 25000 155896 36700
RAMGARH GT POWER PROJECT RRVUNL THERMAL-COAL 22050 43177 41800
RAMGARH GAS T P PROJECT 3 RRVUNL THERMAL-GAS 5000 93615 41800
DHOLPUR C C POWER PROJECT RRVUNL THERMAL-R-LNG 33000 9486 46110
MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 14000 20855 34192
MINI MICRO HYDEL (MMH) P S RRVUNL HYDRO-HYDRO 2385 851 37800
KALISINDH TPP 1 RRVUNL THERMAL-COAL 60000 341543 45000
KALISINDH TPP 2 RRVUNL THERMAL-COAL 60000 211588 45000
KHARA HEP UPJVNL HYDRO-HYDRO 7200 26654 7200
MATATILLA HEP UPJVNL HYDRO-HYDRO 3060 12219 6500
OBRA HEP UPJVNL HYDRO-HYDRO 9900 21517 6300
RIHAND UPJVNL HYDRO-HYDRO 30000 57369 5500
ANPARA A TPS UPRVUNL THERMAL-COAL 63000 317536 27000
ANPARA B TPS UPRVUNL THERMAL-COAL 100000 705605 22700
ANPARA D UPRVUNL THERMAL-COAL 100000 300158 39800
HARDUAGANJ TPS UPRVUNL THERMAL-COAL 16500 45817 49200
HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 50000 304389 46600
OBRA A TPS UPRVUNL THERMAL-COAL 28800 13158 34000
OBRA B TPS UPRVUNL THERMAL-COAL 100000 328124 21900
Page 34
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) PANKI TPS UPRVUNL THERMAL-COAL 21000 66488 50300
PARICHHA TPS UPRVUNL THERMAL-COAL 22000 38762 49400
PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 42000 231931 45600
PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 50000 276722 50400
CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 24000 70845 8290
CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 14400 75366 8390
DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 3375 9595 12080
DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 5100 18701 10520
KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4140 17359 12330
KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 12000 33001 9420
KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 3000 11953 8320
TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 9000 33983 12460
MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 30400 124510 16110
RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 19800 17897 10550
MPUR UTTARAKHAND JVNL HYDRO-HYDRO 930 5121 19200
PATHRI UTTARAKHAND JVNL HYDRO-HYDRO 2040 11636 14200
GALOGI UTTARAKHAND JVNL HYDRO-HYDRO 300 648 12500
PRIVATE SECTOR
MGTPP CLP INDIA PVT LTD THERMAL-COAL 132000 268902 41940
SHRINAGAR HEP ALAKNANDA HPCL HYDRO-HYDRO 33000 127414 48800
GAMA INFRAPROP CCPP GAMA INFRAPROP PVT THERMAL-GAS 22500 52686 47000
PPGCL (BARA) JP POWER VENTURES LTD THERMAL-COAL 198000 448200 38500
MALANA HEP MALANA PCL HYDRO-HYDRO 8600 26354 29792
MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 10000 30369 32580
ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 19200 56347 36079
KASHANG HEP H P PCL HYDRO-HYDRO 19500 5034 29200
BASPA-II HEP HBPCL HYDRO-HYDRO 30000 132769 13600
KARCHAM WANGTOO HEP HBPCL HYDRO-HYDRO 100000 434386 36600
RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 108000 582600 43700
RITHALA COMBI CY POWER PLANT TATA POWER DDL THERMAL-GAS 9480 000 11900
RAJPURA TPS NABHA POWER LTD THERMAL-GAS 140000 901484 39000
TALWANDI SABO POWER LTD TALWANDI SABO POWER LTD THERMAL-COAL 198000 636040 49548
ROJA THERMAL POWER STATION ROJA POWER SCL THERMAL-COAL 120000 727200 43400
KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 34400 63400
BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 36000 62600
MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 38200 60800
UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 37900 61500
KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 42300 58800
LALITPUR PGCL BAJAJ ENERGY PVT LTD THERMAL-COAL 198000 359400 47300
PRAYAGRAJ PGCL PRAYAGRAJ PGCL THERMAL-COAL 132000 448200 38595
KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 132000 783182 33438
WESTERN REGION
CENTRAL SECTOR
INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 100000 325333 23892
OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 52000 141663 34001
GANDHAR CCPP NTPC LTD THERMAL-GAS 65739 221924 28700
KAWAS CCPP NTPC LTD THERMAL-GASN 65620 167929 27000
KORBA I amp II NTPC LTD THERMAL-COAL 210000 1499171 20500
KORBA III NTPC LTD THERMAL-COAL 50000 358746 26600
SIPAT STPS I NTPC LTD THERMAL-COAL 198000 1479902 26800
SIPAT STPS II NTPC LTD THERMAL-COAL 100000 766549 26500
VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 126000 693142 25800
VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 100000 608781 23800
VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 100000 673475 27600
VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 100000 655924 32900
VINDHYACHAL STPS V NTPC LTD THERMAL-COAL 50000 328265 31700
MOUDA I NTPC LTD THERMAL-COAL 100000 343130 44500
MOUDA Ii NTPC LTD THERMAL-COAL 66000 40637 39900
RATNAGIRI GAS amp POWER PVT LTD RGPPL THERMAL-GAS 196708 442485 47000
KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 000 24729
TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 32000 201227 10740
Page 35
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 365122 19069
TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 787444 29324
STATE SECTOR
GSEG-HAZIRA15610 MW GUJARAT S ENEGEN LTD THERMAL-GAS 15610 1805 28200
GSEG-HAZIRA35143 MW GUJARAT S ENEGEN LTD THERMAL-GAS 35130 22276 51300
GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 21978 51800
AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 13929 26100
KORBA TPS EAST CSPGCL THERMAL-COAL 44000 198673 33880
DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 365808 27570
KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 316500 30420
HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 532878 19410
CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 515 58300
MTTPS CHAMPA U-I CSPGCL THERMAL-COAL 50000 220376 39000
MTTPS CHAMPA U-II CSPGCL THERMAL-COAL 50000 23709 10000
SHP GANGREL CSPGCL HYDRO-HYDRO 1000 2350 36790
BANGO HEP CSPGCL HYDRO-HYDRO 12000 14662 8900
MHP KORBA WEST CSPGCL HYDRO-HYDRO 170 859 38190
SIKASAR HEP CSPGCL HYDRO-HYDRO 700 418 26870
DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8843 74500
DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 19446 51500
GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 66388 71600
GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127488 41300
KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 96072 43900
KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 29841 56400
SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 184966 58800
UKAI 1-5 GSECL THERMAL-COAL 85000 204891 46900
UKAI TPS 6 GSECL THERMAL-COAL 50000 284448 48200
WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 271999 58300
WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 82808 44100
KADANA HPS GSECL HYDRO-HYDRO 24200 34433 16800
UKAI HPS GSECL HYDRO-HYDRO 30500 40585 6100
TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 123000 11500
BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 8900 10900
BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 7200 27500
JHINNA HPS MPPGCL HYDRO-HYDRO 2000 9700 18500
RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 44300 3400
GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 17300 4600
SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 4100 16900
MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 14600 27000
PENCH HPS MPPGCL HYDRO-HYDRO 16000 23700 8100
RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 3000 16900
AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 134400 35100
SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 283800 38700
SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 344600 34300
SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 111600 61600
SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 211800 58000
SSTPS PH-I MPPGCL THERMAL-COAL 120000 233100 84300
BHUSAWAL TPS MSPGCL THERMAL-COAL 142000 566258 51100
CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1365682 33700
KHAPERKHEDA MSPGCL THERMAL-COAL 134000 706207 39100
KORADI TPS MSPGCL THERMAL-COAL 62000 443206 42000
NASIK TPS MSPGCL THERMAL-COAL 63000 297275 47000
PARLI TPS MSPGCL THERMAL-COAL 113000 175934 71600
PARAS MSPGCL THERMAL-COAL 50000 267931 38700
URAN CCPP MSPGCL THERMAL-GAS 67200 320330 30600
KOYANA MSPGCL HYDRO-HYDRO 195600 328155 13100
SMALL HYDRO POWER PLANTS MSPGCL HYDRO-HYDRO 45400 93062 30500
BHIRA MSPGCL HYDRO-HYDRO 8000 10046 8400
TILLARI MSPGCL HYDRO-HYDRO 8900 10584 3100
SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 233298 20500
SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 87633 20500
PRIVATE SECTOR
Page 36
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 81282 46750
JNSTPP(JAYPEE NIGRIE) JP POWER VENTURES LTD THERMAL-COAL 132000 726695 29310
MB POWER MB POWER THERMAL-COAL 120000 345632 38310
ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 754922 28671
ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 780761 23495
ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 198000 1263784 32090
ADANI POWER MAHARA ADANI POWER LTD THERMAL-COAL 330000 1666191 34124
AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 170065 36827
SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 252035 45129
ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 458551 36000
ESSAR POWER MP LTD ESSAR POWER MP LTD THERMAL-COAL 60000 243040 28600
VEDANTA LTD (P P -I) VEDANTA LTD THERMAL-GAS 3000 15044 24000
VEDANTA LTD (P P -II) VEDANTA LTD THERMAL-GAS 3000 21293 24000
PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 8234600 24000
165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 5850 64390
145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 68717 40349
SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 132655 28776
SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 144686 38567
MUNDRA UMPPCOASTAL GUJARAT POWER
LTD THERMAL-IMP COAL 400000 2530300
23900
LANCO AMARKANTAK TPP PATHADIH
U-ILANCO AMARKAN POWER LTD THERMAL-COAL 30000 195500
29200
LANCO AMARKANTAK TPP PATHADIH
U-IILANCO AMARKAN POWER LTD THERMAL-COAL 30000 206900
27600
BARADARHA TPS D B POWER LTD THERMAL-COAL 120000 677373 29200
JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 405000 28900
JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 453000 40500
DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 339437 40700
TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 293400 44000
TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 137200 37000
TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 174900 44000
BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 92900 14100
BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23700 34300
KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 27600 48300
CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2530300 23900
BHANDARDRA HEP -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 2475 54900
SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 161400 26500
SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 445000 39000
SOTHERN REGION
CENTRAL SECTOR
NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 325699 54820
NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 305532 39880
NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 998805 38510
NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 113016 54070
NEYVELI TAMILNADU POWER LTD JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 625274 42200
VALLUR TPS NTPC TECL THERMAL-COAL 150000 856438 42350
R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 1493 84300
RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1502919 29400
RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 341291 31800
SIMHADRI I NTPC LTD THERMAL-COAL 100000 688382 36800
SIMHADRI II NTPC LTD THERMAL-COAL 100000 663657 43400
KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 593110 31324
MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 291625 21764
KKNPP-1 amp 2 NPCIL NUCLEAR-NUCLEAR 200000 572609 40948
MINICOY LAKSHADEEP THERMAL-DIESEL 340 770 29600
KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1097 29600
AMINI LAKSHADEEP THERMAL-DIESEL 265 509 29600
ANDROTT LAKSHADEEP THERMAL-DIESEL 219 524 29600
KALPENI LAKSHADEEP THERMAL-DIESEL 175 356 29600
AGATTI LAKSHADEEP THERMAL-DIESEL 195 658 29600
KADMAT LAKSHADEEP THERMAL-DIESEL 190 414 29600
KILTAN LAKSHADEEP THERMAL-DIESEL 150 269 29600
CHETLET LAKSHADEEP THERMAL-DIESEL 100 139 29600
BITRA LAKSHADEEP THERMAL-DIESEL 043 024 29600
BANGARAM LAKSHADEEP THERMAL-DIESEL 018 009 29600
Page 37
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) STATE SECTOR
Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 721811 46500
Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 50000 336142 46500
RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 237358 46500
RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 239926 46500
RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 124500 46500
SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 62109 46500
UPPER SILERU APGENCO HYDRO-HYDRO 24000 33000 46500
LOWER SILERU APGENCO HYDRO-HYDRO 46000 81066 46500
DONKARAI APGENCO HYDRO-HYDRO 2500 6007 46500
PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 1262 46500
CHETTIPETA APGENCO HYDRO-HYDRO 100 214 46500
MUCHKUND APGENCO HYDRO-HYDRO 12000 37571 46500
NAGARJUNASAGAR RCPH APGENCO HYDRO-HYDRO 9000 606 46500
TUNGABHADRA HES amp HAMPI(AP
Share)
APGENCO HYDRO-HYDRO 7200 6100 46500
KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 352232 42600
KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 288131 32500
KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 319272 46500
RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 40073 44300
KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 308317 46000
KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 308963 51300
SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 61004 76600
NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 17960 75300
PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 20873 58300
POCHAMPAD-I TSPGENCO HYDRO-HYDRO 2700 5455 29800
POCHAMPAD-II TSPGENCO HYDRO-HYDRO 900 1932 40700
NIZAMSAGAR TSPGENCO HYDRO-HYDRO 1000 1126 53400
RAICHUR TPS 1 to 7 KPCL THERMAL-COAL 147000 890866 43800
RAICHUR TPS 8 KPCL THERMAL-COAL 25000 159523 48200
BELLARI TPS 1 KPCL THERMAL-COAL 50000 318679 51100
BELLARI TPS 2 KPCL THERMAL-COAL 50000 232347 55600
BELLARI TPS 3 KPCL THERMAL-COAL 70000 47565 34400
BHADRA PH KPCL HYDRO-HYDRO 3920 2369 45900
GERUSUPPA PH KPCL HYDRO-HYDRO 24000 26990 22000
GHAT PRABHA HEP KPCL HYDRO-HYDRO 3200 4777 25300
KADRA HPS KPCL HYDRO-HYDRO 15000 16889 26800
NAGJHARI KPCL HYDRO-HYDRO 90000 155159 9800
KODASALLI DPH KPCL HYDRO-HYDRO 12000 14854 19200
MUNIRA+MGH+SPH+SPH KPCL HYDRO-HYDRO 22640 48211 7900
SHARAVATHY HPS KPCL HYDRO-HYDRO 108550 276215 5400
ALMATTI DPH KPCL HYDRO-HYDRO 29000 39611 24600
VARAHI UGPH KPCL HYDRO-HYDRO 46000 71368 15600
IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 17196 15300
IDUKKI HPS KSEB HYDRO-HYDRO 78000 137905 15300
KAKKAD HPS KSEB HYDRO-HYDRO 5000 13063 15300
KALLADA HPS KSEB HYDRO-HYDRO 1500 4436 15300
KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 46544 15300
KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 635 15300
LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 30822 15300
MALANKARA HPS KSEB HYDRO-HYDRO 1050 2474 15300
MATTUPETTY KSEB HYDRO-HYDRO 200 230 15300
MALAMPUZHA KSEB HYDRO-HYDRO 250 063 15300
CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 864 15300
URUMI ST I amp II KSEB HYDRO-HYDRO 615 903 15300
LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 248 15300
NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7765 19625 15300
PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 16601 15300
PANNIAR HPS KSEB HYDRO-HYDRO 3240 6217 15300
PORINGALKUTHU KSEB HYDRO-HYDRO 3600 10052 15300
PORINGALKUTHU LBE KSEB HYDRO-HYDRO 1600 9438 15300
PEPPARA KSEB HYDRO-HYDRO 300 395 15300
POOZHITHODE KSEB HYDRO-HYDRO 480 1045 15300
Page 38
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) PEECHI KSEB HYDRO-HYDRO 125 040 15300
RANI-PERUNADU KSEB HYDRO-HYDRO 400 585 15300
SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 79783 15300
SENGULAM HPS KSEB HYDRO-HYDRO 5120 11558 15300
SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 16711 15300
VILANGAD KSEB HYDRO-HYDRO 750 1578 15300
BARAPOLE KSEB HYDRO-HYDRO 1500 1932 15300
VELLATHOOVAL KSEB HYDRO-HYDRO 360 305 15300
CHIM0NY KSEB HYDRO-HYDRO 250 156 15300
ADYANPARA KSEB HYDRO-HYDRO 350 501 15300
BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 554 15300
KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 3801 15300
KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 23132 32800
ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 14416 62280
METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 523970 62280
METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 321270 62280
NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 336575 62280
NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 591240 62280
TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 508966 62280
KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 30897 62280
VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 18720 90699 62280
KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 33593 62280
BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 1047 62280
PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 1250 62280
PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 330 62280
MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 4897 62280
MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 032 62280
KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15681 62280
KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 40608 62280
KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 21342 62280
KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 4717 62280
KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4322 62280
KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2399 62280
METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 4416 62280
METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 8035 62280
BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2187 62280
BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2359 62280
BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2511 62280
BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 1949 62280
BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 1819 62280
POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 172 62280
SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 241 62280
MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 026 62280
THIRUMOORTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 136 62280
PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 9309 62280
VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 353 62280
SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 4192 62280
PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 6571 62280
SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 1186 62280
SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6319 62280
ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 6122 62280
KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 28674 62280
SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 18381 62280
SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 4258 62280
KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 12680 62280
KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4201 62280
ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 000 62280
PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 19175 62280
AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 078 62280
BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 504 62280
BHAVANI KATTALAI (BKB)(IIIampIII BB I amp II)TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 5847 62280
PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 000 62280
Page 39
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) SRI DAMODARAM STPS APPDCL THERMAL-COAL 160000 808108 36300
PRIVATE SECTOR
KARUPPUR TANJORE LANCO TANJORE PCL THERMAL-GAS 12000 48096 28770
SIMHAPURI ENERGY LTD SIMHAPURI ENERGY LTD THERMAL-COAL 60000 143900 39100
JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 7111 45500
SBU 1 JSW ENERGY LTD
VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 26000 159100
43300
SBU 2 JSW ENERGY LTD
VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 60000 247900
42800
LANCO KPLLANCO KONDAPALLI POWER
LTDTHERMAL-GAS 36814 85060
25776
LANCO KPL STG -IILANCO KONDAPALLI POWER
LTDTHERMAL-GAS 36600 12979
46330
LANCO KPL STG -IIIALANCO KONDAPALLI POWER
LTDTHERMAL-GAS 37100 85710
46330
LANCO KPL STG -III BLANCO KONDAPALLI POWER
LTDTHERMAL-GAS 37100 43639
46330
HINDUJA NATIONAL PCL HINDUJA NATIONAL PCL THERMAL-COAL 104000 303000 38200
MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 121164 49940
UDUPI POWER COR LTD ADANI POWER LTD THERMAL-COAL 120000 754613 42500
SPECTRUM POWER GENERATION
LTD SPECTRUM PG LTD THERMAL-GASN 20525 9256812
34952
TAQA NEYVELI POWER COM PVT
LTD TAQA NEYVELI THERMAL-LIG 25000 5840
34500
ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 251000 51000
ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 207860 36800
GMR VEMAGIRI POWER GENERATION
LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 30117
46450
EASTERN REGION
CENTRAL SECTOR
MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 64675 53113
MTPS STAGE - II KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 39000 1432 69138
BOKARO `B` TPS DVC THERMAL-COAL 63000 145670 31539
MEJIA TPS U 1-3 DVC THERMAL-COAL 63000 348298 31552
MEJIA TPS U 4 DVC THERMAL-COAL 21000 116099 34997
MEJIA TPS U 5-6 DVC THERMAL-COAL 50000 276427 35976
MEJIA TPS U 7-8 DVC THERMAL-COAL 100000 552854 36991
DURGAPUR STEEL TPS DVC THERMAL-COAL 100000 665550 39323
DURGAPUR TPS DVC THERMAL-COAL 21000 59270 35416
RAGHUNATHPUR TPS DVC THERMAL-COAL 120000 201650 35326
MAITHON HYDEL STA DVC HYDRO-HYDRO 6320 12200 17984
CHANDRAPURA TPSU1-3 DVC THERMAL-COAL 42000 257610 35095
CHANDRAPURA TPSU7-8 DVC THERMAL-COAL 50000 306673 34987
KODERMA TPS DVC THERMAL-COAL 100000 380180 38131
PANCHET HPS DVC HYDRO-HYDRO 8000 13360 17984
TILLAYA HPS DVC HYDRO-HYDRO 400 1410 17984
RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34700 35400
TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 277300 23200
TLDP -III NHPC LTD HYDRO-HYDRO 13200 55400 62000
TLDP -IV NHPC LTD HYDRO-HYDRO 16000 60300 25600
FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 957219 33700
FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 308943 41000
BONGAINGAON TPS NTPC LTD THERMAL-COAL 25000 153663 58600
KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 542277 34200
KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 942591 34200
BARH-II NTPC LTD THERMAL-COAL 132000 728021 44500
TALCHER TPS NTPC LTD THERMAL-COAL 46000 335521 30100
TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 702319 25600
TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1436521 24700
STATE SECTOR
BTPS(RampM) BIHAR STATE PGCL THERMAL-COAL 22000 12142 39700
BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 98331 10602
HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 50593 9482
CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 19689 2605
RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 53192 6033
UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 147208 14637
Page 40
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 60353 4519
IB TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 288567 25000
J P H GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 210 038 61100
MEYONG CHU GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 400 1086 61100
TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 122667 38200
DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 214339 43321
KOLAGHAT THERMAL POWER
STATION
WEST BENGAL PDCL THERMAL-COAL 126000 538269 31603
BAKRESHWAR THERMAL POWER
PLANT
WEST BENGAL PDCL THERMAL-COAL 105000 634876 32154
BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 45000 166855 33299
SANTHALDIH THERMAL POWER
STATION
WEST BENGAL PDCL THERMAL-COAL 50000 336442 34932
SAGARDIGHI THERMAL POWER
PROJECT
WEST BENGAL PDCL THERMAL-COAL 160000 423121 34705
JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 20344 68900
RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 24559 68900
TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 4623 68900
PURULIA PUMPED STORAGE
PROJECT
WEST BENGAL SEDCL HYDRO-HYDRO 90000 108816 68900
MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2768 68900
PRIVATE SECTOR
CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 49474 20230
CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 555500 70200
HALDIA ENERGY HALDIA ENERGY LTD THERMAL-COAL 60000 371000 50400
DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3688 63400
KAMALANGA TPS GMR KAMALANGA ENERGY LTD THERMAL-COAL 105000547670
33300
ADHUNIK POWER U-1 ADHUNIK POWER THERMAL-COAL 27000 158 44060
ADHUNIK POWER U-2 ADHUNIK POWER THERMAL-COAL 27000 168 44250
VL-JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 332800 23622
JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 43000 45250
JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 71700 37030
JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 70700 35920
JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 71100 38870
JOJOBERA UNIT 5 TATA POWER COM LTD THERMAL-COAL 12000 79300 44560
JOJOBERA UNIT 6 TATA POWER COM LTD THERMAL-WHR 12000 83700 12840
IEL KALINGANAGAR U-I TATA POWER COM LTD THERMAL-WG 6750 33400 22500
IEL KALINGANAGAR U-II TATA POWER COM LTD THERMAL-WG 6750 34800 22500
MAITHON UNIT 1 amp 2 TATA POWER COM LTD THERMAL-COAL 105000 678000 36100
HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 27500 24340
HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 28400 24340
HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 15800 24310
NORTH EASTERN REGION
CENTRAL SECTOR
LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 74100 36600
AGARTALA GT NEEPCO THERMAL-GAS 13500 88611 27210
ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 153111 32310
DOYANG HEP NEEPCO HYDRO-HYDRO 7500 25598 49801
KOPILI HEP NEEPCO HYDRO-HYDRO 20000 98186 11491
KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 19582 20237
KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 10310 17968
RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 124093 22945
TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 10100 17344 39000
STATE SECTOR
HYDRO POWER (122 Stns) ITANAGAR GOVT OF ARUNACHAL
PRADESHHYDRO-HYDRO 6971 6217270
24600
KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39514 17337
LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 82327 36810
NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 33318 48290
MYNTRIANG SHEP ST II ASSAM POWER GENCO HYDRO-HYDRO 300 567 35776
LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 9130 49200
LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 012 49200
DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 022 49200
TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 000 49200
UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 4990 16000
UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 6476 37000
UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 16494 14600
UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 3600 9556 15000
SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 758 8000
MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44070 44800
KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 154 41400
TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 091 41400
MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 411 41400
MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 394 41400
KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 760 41400
SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 3264 41400
LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 044 41400
BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 18953 28000
ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 43585 28200
GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 4080 11100
Note
LIG Lignite N Naptha WHR Waste Heat Recovery
Page 41
File NoCEA-CH-14-1142018-Coordination Division
SlNo Line
Length
(cKM)
1 2 3 4 5 6
1 765 Jharsuguda - Dharamjaygarh line DC PGCIL 296
2 765LILO of Kurnool - Thirvualam line at
CuddapahDC PGCIL 190
3 765 Salem PS - Madhugiri PS line SC PGCIL 243
4 400 Cuddapah - Hindupur line (Q) DC PGCIL 338
5 400LILO of Both Ckt of Bamnauli - Samaypur at
TughlakabadMC PGCIL 114
6 400LILO-Out of Cuddapah - Hindupur line (Q)
(Both Ckts) at NP Kunta ssDC PGCIL 19
1200
7 400LILO of Sterlite - Meramundali at Lapanga
4oo kV ssDC OPTCL 14
8 400 Sterlite - Lapanga line DC OPTCL 37
9 400 TMDC Podili - Sattapenalli line DC APTRANSCO 215
10 230Neyveli 230110 kV ss - Eachangadu
230kV FeederSC TANTRANSCO 1
11 230 NNTPS - Neyveli 230110kV ss DC TANTRANSCO 2
12 220 Ajmer (400 kV) - Bherunda (TK) DC RVPNL 100
13 220 Aligarh - Atrauli line DC UPPTCL 77
14 220 Khandwa - Chhanera line DC MPPTCL 78
15 220LILO of one Ckt of Hadala - Sartanpar line
at Wankaner on MC towersDC GETCO 6
16 220 LILO of one Ckt of Vita - Miraj at Alkud ss DC MSETCL 27
17 220 Mendhigiri - Alkud ss DC MSETCL 110
667
1867
20(2)
Grand Total
2Transmission Lines (220 kV and above) CommissionedReady for commissioning During Oct-2018
As on 31-10-18
Voltage
Level (kV)Name of Transmission Lines
Circuit
Type
Executing
Agency
CENTRAL SECTOR
Total of CENTRAL SECTOR
STATE SECTOR Sector
Total of STATE SECTOR
File NoCEA-CH-14-1142018-Coordination Division
SN Contents Page
1 Executive summary of Target and Achievement of Substations during 2018-19 21(1)
2Sub Stations (220 kV and above) commissionedready for commisssioning during Oct-
201821(2)
Section D - Sub Stations
File NoCEA-CH-14-1142018-Coordination Division
1 Executive summary of Target and Achievement of Substations during 2018-19 As on Oct-18
(All figures in circuit MVA)
Centr
al S
ecto
r
Sta
te S
ecto
r
JV
Private
Secto
r
To
tal
Centr
al S
ecto
r
Sta
te S
ecto
r
JV
Private
Secto
r
To
tal
Centr
al S
ecto
r
Sta
te S
ecto
r
JV
Private
Secto
r
To
tal
Centr
al S
ecto
r
Sta
te S
ecto
r
JV
Private
Secto
r
To
tal
Centr
al S
ecto
r
Sta
te S
ecto
r
JV
Private
Secto
r
To
tal
Cen
tral S
ecto
r
Sta
te S
ecto
r
JV
Pri
vate
Secto
r
Gra
nd
To
tal
3000 0 0 3000 0 0 0 0 22200 0 0 22200 8185 13085 630 21900 740 14760 0 15500 34125 27845 630 62600
Oct18 Programme 0 0 0 0 0 0 0 0 0 0 0 0 1000 1260 630 2890 0 1400 0 1400 1000 2660 630 4290
Achievement 0 0 0 0 0 0 0 0 3000 0 0 3000 1500 3120 0 4620 0 2220 0 2220 4500 5340 0 9840
Upto Oct-18 Programme 0 0 0 0 0 0 0 0 10000 0 0 10000 6130 7435 630 14195 0 9670 0 9670 16130 17105 630 33865
Achievement 0 0 0 0 0 0 0 0 14000 0 0 14000 9000 7550 630 17180 0 10610 0 10610 23000 18160 630 41790
21(1)
220 kV Grand Total 800 kV 500 kV
Programme 2018-19
Programme
Achievement
HVDC765 kV 400 kV
File NoCEA-CH-14-1142018-Coordination Division
As on 31-10-18
Sl Voltage Ratio Capacity
No (kVkV) (MWMVA)
1 2 3 4 5
1 Cuddapah Ss 765400 PGCIL 3000
2 Tughlakabad SS (GIS) 400220 PGCIL 1500
Total of CENTRAL SECTOR 4500
3 Panki Kanpur (Aug) TF-I 400200 UPPTCL 75
4 Hindupur ss (1st ICT) 400220 APTRANSCO 315
5 Thappagundu ss 400110 TANTRANSCO 600
6 Mendhasal (2nd power TF) 400220 OPTCL 20
7 Jodhpur ss (New) 400220 RVPNL 315
8 Shankarpally 400220 TSTRANSCO 500
9 Podili ss (1st ICT) 400220 APTRANSCO 315
10 Doni (Gadag)SS 400220 KPTCL 1000
11 Porur (Addl TF) 230110 TANTRANSCO 100
12 Anuppankulam (Addl TF) 230110 TANTRANSCO 60
13 Neyveli SS 230110 TANTRANSCO 480
14 Savarkundla (Aug) 22066 GETCO 60
15 Bhuna (Aug) 220132 HVPNL 100
16 Madanpur (Aug) 22066 HVPNL 100
17 Gurgaon Sec-52A (Aug) 22066 HVPNL 160
18 IA Hisar (Aug) 220132 HVPNL 50
19 Narwana (Aug) 220132 HVPNL 60
20 Therubali (3rd Auto TF) 220132 OPTCL 160
21 Halasar ss 220132 RVPNL 160
22 Bansi Siddaharthnagar (Aug) TF-I 220132 UPPTCL 60
23 Hata Kushinagar (New) TF-I 220132 UPPTCL 100
24 Gomti nagar Lucknow (Aug) TF-IV 22033 UPPTCL 60
25 Kanpur Road Lucknow (New) TF-III 22033 UPPTCL 60
26 Asoj (Aug) 22066 GETCO 150
27 Kangasiyali (Aug) 22066 GETCO 60
28 Karmsad (Aug) 22066 GETCO 160
29 Lalpar (Aug) 22066 GETCO 60
TOTAL STATE SECTOR 5340
GRAND TOTAL 9840
21(2)
PRIVATE SECTOR
CENTRAL SECTOR
STATE SECTOR
2Sub-Stations (220 kV and above) CommissionedReady for commissioning During Oct-2018
Name of Sub StationsExecuting
Agency
File NoCEA-CH-14-1142018-Coordination Division
SN Contents Page
1 Electricity Generation (MU) Targets and Achievements for 2018-19 22
Section E - Electricity Generation
File NoCEA-CH-14-1142018-Coordination Division
Programme Achievement Ach Programme Achievement Ach
Central Sector 35160700 3028100 3162321 10443 20144400 21150469 10499
State Sector 35132000 3010000 3017260 10024 19922100 19549030 9813
PvtIPP Sector 36999700 3240600 3375603 10417 21598300 20794155 9628
PvtUTL Sector 1857600 164500 180597 10979 1130900 1203107 10638
Total 109150000 9443200 9735781 10310 62795700 62696761 9984
Central Sector 5617600 420900 451004 10715 4193000 4045436 9648
State Sector 6110600 559500 708469 12663 4049400 4433000 10947
PvtIPP Sector 1141800 80500 90122 11195 976400 1021963 10467
PvtUTL Sector 130000 11300 12564 11119 76700 99943 13030
Total 13000000 1072200 1262159 11772 9295500 9600342 10328
Central Sector 3850000 353300 303310 8585 2068900 2203540 10651
Total 3850000 353300 303310 8585 2068900 2203540 10651
Bhutan Import 500000 63300 35395 5592 347000 416660 12007
Central Sector 44628300 3802300 3916635 10301 26406300 27399445 10376
State Sector 41242600 3569500 3725729 10438 23971500 23982030 10004
Pvt Sector 40129100 3496900 3658886 10463 23782300 23119168 9721
Total 126500000 10932000 11336645 10370 74507100 74917303 10055
Provisional based on actual-cum-Assesment
Figs in MU
Cummulative
Achievement
Cummulative
Achievement
Sep-18 Sep-17 Upto Sep-2018 Upto Sep-2017
1073794 748889 7332680 5660929
22
Renewable Energy Generation
Achievement
Oct-2018
1 Electricity Generation (MU) Targets and Achievememts for 2018-19
All India Energy Generation During April 2018- Oct 2018 (MU)
Target (2018-19)April 2018- Oct 2018
Sector
Hydro
Thermal
Nuclear
627957
92955
20689
745071
626968
96003
22035
749173
0
100000
200000
300000
400000
500000
600000
700000
800000
Thermal Hydro Nuclear Total
Programme
Achievement
File NoCEA-CH-14-1142018-Coordination Division
SN Contents Page
1 Energy Power Supply Position (Provisional) for Oct-2018 and during April 2018- Oct 2018 23
2 Peak Power Supply Position (Provisional) for Oct-2018 and during April 2018- Oct 2018 24
3 Energy Power Supply Position (Revised) for Sep-2018 and during April 2018- Sept 2018 25
4 Peak Power Supply Position (Revised) for Sep-2018 and during April 2018- Sept 2018 26
5 Notified Power cuts Restrictions on Industries during Oct-2018 27
6 Power Supply to Agricultural Sector during Oct-2018 28
Section F - Power supply position
File NoCEA-CH-14-1142018-Coordination Division
आकड़ मममलयन यननट नट Figures in MU net
ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied
कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )
चडीगढ़ Chandigarh 108 108 0 00 1055 1055 0 00
दिलली Delhi 2490 2489 1 00 22524 22510 14 01
हरियजणज Haryana 4554 4554 0 00 35205 35205 0 00
दहमजचल परिश Himachal Pradesh 788 787 2 02 5728 5560 168 29
रमम कशमीि Jammu amp Kashmir 1497 1219 278 186 10982 8865 2117 193
परजब Punjab 4418 4418 0 00 38832 38819 13 00
िजरसथजन Rajasthan 6748 6748 0 00 45341 45181 160 04
उतति परिश Uttar Pradesh 10136 9973 164 16 75485 74808 676 09
उततिजखड Uttarakhand 1083 1081 3 03 8395 8310 85 10
उततरी कषतर Northern Region 31822 31375 447 14 243547 240314 3233 13
छततीसगढ़ Chhattisgarh 2454 2453 1 00 16119 16091 28 02
गरिजत Gujarat 11636 11636 0 00 70782 70768 14 00
मधय परिश Madhya Pradesh 5860 5859 1 00 38412 38410 2 00
महजिजषटर Maharashtra 15223 15095 128 08 95489 95355 134 01
िमन औि दिउ Daman amp Diu 216 216 0 00 1523 1523 0 00
िजिि व नगि हवली Dadra amp Nagar Haveli 553 553 0 00 3757 3757 0 00
गोवज Goa 366 366 0 00 2497 2495 2 01
पशचिमी कषतर Western Region 36308 36178 130 04 228579 228398 180 01
आनधर परिश Andhra Pradesh 5860 5854 6 01 37377 37334 43 01
तलगजनज Telangana 6748 6742 6 01 38251 38205 46 01
कनजाटक Karnataka 5842 5835 7 01 39111 39059 52 01
किल Kerala 2116 2096 20 09 14256 14160 96 07
तममल नजड Tamil Nadu 8611 8601 10 01 65742 65666 76 01
पडचिी Puducherry 216 215 1 05 1654 1646 8 05
लकष-दवीप Lakshadweep 4 4 0 0 27 27 0 0
दकषकषणी कषतर Southern Region 29392 29342 50 02 196390 196069 321 02
बबहजि Bihar 2742 2738 4 01 19143 18951 192 10
िजमोिि घजटी ननगम DVC 1712 1698 13 08 13096 12828 268 20
झजिखणड Jharkhand 701 697 4 06 5022 4949 73 15
ओडडशज Odisha 3147 3134 13 04 20224 20192 32 02
पशशचम बगजल West Bengal 4204 4200 4 01 33008 32881 127 04
मसशककम Sikkim 40 40 0 00 279 279 0 01
अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 67 202 188 13 67
परवी कषतर Eastern Region 12547 12507 40 03 90772 90080 692 08
अरणजचल परिश Arunachal Pradesh 67 66 1 09 502 496 7 13
असम Assam 833 809 24 29 6153 5903 250 41
मणणपि Manipur 72 71 1 10 485 478 7 14
मघजलय Meghalaya 147 147 0 00 1043 1042 0 00
ममज़ोिम Mizoram 63 62 1 08 365 359 5 14
नजगजलड Nagaland 76 67 8 110 540 481 59 109
बिपिज Tripura 130 129 1 09 1025 1007 19 18
उततर-परवी कषतर North-Eastern Region 1387 1351 35 25 10113 9766 346 34
समपणण भारत All India 111455 110753 702 06 769399 764627 4773 06
23
ऊराण वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Energy Power Supply Position Report (Provisional)
राजयStateअकरबर2018 October2018 अपरल2018 -अकरबर2018 April2018 to October2018
ऊरजा पनत ा म कमी ऊरजा पनत ा म कमीEnergy not Supplied
Excludes energy exported to Bangladesh
Energy not Supplied
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
File NoCEA-CH-14-1142018-Coordination Division
अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met
कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )
चडीगढ़ Chandigarh 217 217 0 00 369 369 0 00
दिलली Delhi 4713 4713 0 00 7016 7016 0 00
हरियजणज Haryana 7948 7948 0 00 10270 10270 0 00
दहमजचल परिश Himachal Pradesh 1520 1520 0 00 1520 1520 0 00
रमम कशमीि Jammu amp Kashmir 2836 2269 567 200 2951 2361 590 200
परजब Punjab 7979 7979 0 00 12638 12638 0 00
िजरसथजन Rajasthan 11450 11450 0 00 11698 11698 0 00
उतति परिश Uttar Pradesh 17434 16745 688 39 20498 20062 436 21
उततिजखड Uttarakhand 1943 1943 0 00 2143 2143 0 00
उततरी कषतर Northern Region 50659 49635 1024 20 63166 61726 1440 23
छततीसगढ़ Chhattisgarh 4414 4268 146 33 4414 4268 146 33
गरिजत Gujarat 18148 18130 19 01 18148 18130 19 01
मधय परिश Madhya Pradesh 11356 11317 39 03 11356 11317 39 03
महजिजषटर Maharashtra 23864 23159 705 30 23864 23254 610 26
िमन औि दिउ Daman amp Diu 342 341 1 02 357 356 1 02
िजिि व नगि हवली Dadra amp Nagar Haveli 784 780 4 05 816 815 1 01
गोवज Goa 536 536 0 00 596 596 0 00
पशचिमी कषतर Western Region 56548 55695 853 15 56548 55695 853 15
आनधर परिश Andhra Pradesh 9435 9435 0 00 9435 9435 0 00
तलगजनज Telangana 10603 10603 0 00 10815 10815 0 00
कनजाटक Karnataka 10741 10741 0 00 10741 10741 0 00
किल Kerala 3727 3644 83 22 4050 3997 53 13
तममल नजड Tamil Nadu 14747 14333 414 28 15029 14981 47 03
पडचिी Puducherry 363 362 1 03 420 400 19 46
लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0
दकषकषणी कषतर Southern Region 45279 45226 53 01 45946 45684 262 06
बबहजि Bihar 4945 4945 0 00 5050 5045 5 01
िजमोिि घजटी ननगम DVC 2729 2729 0 00 2874 2874 0 00
झजिखणड Jharkhand 1260 1260 0 00 1339 1284 55 41
ओडडशज Odisha 5624 5224 400 71 5624 5357 268 48
पशशचम बगजल West Bengal 8775 8775 0 00 9130 9123 7 01
मसशककम Sikkim 86 86 0 00 90 90 0 00
अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7
परवी कषतर Eastern Region 22959 22567 392 17 22959 22567 392 17
अरणजचल परिश Arunachal Pradesh 138 125 13 94 138 133 5 37
असम Assam 1785 1704 81 45 1865 1809 56 30
मणणपि Manipur 187 185 2 11 193 186 7 36
मघजलय Meghalaya 336 336 0 00 371 368 2 07
ममज़ोिम Mizoram 99 97 2 20 103 98 4 41
नजगजलड Nagaland 134 131 3 22 156 138 18 117
बिपिज Tripura 269 269 0 00 298 293 5 17
उततर-परवी कषतर North-Eastern Region 2790 2700 90 32 2967 2850 117 39
समपणण भारत All India 172945 170604 2341 14 177022 175528 1494 08
24
अधिकतम वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Peak Power Supply Position Report (Provisional)
आकड़ मगज वजट नट Figures in MW netअपरल2018 -अकरबर2018 April2018 to October2018
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
मजग की पनता म कमी Demand not Met
Excludes the supply to Bangladesh
राजयStateअकरबर2018 October2018
मजग की पनता म कमी Demand not Met
File NoCEA-CH-14-1142018-Coordination Division
आकड़ मममलयन यननट नट Figures in MU net
ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied
कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )
चडीगढ़ Chandigarh 141 141 0 00 947 947 0 00
दिलली Delhi 2925 2924 1 00 20034 20021 13 01
हरियजणज Haryana 4794 4794 0 00 30651 30651 0 00
दहमजचल परिश Himachal Pradesh 876 853 24 27 4940 4773 167 34
रमम कशमीि Jammu amp Kashmir 1520 1246 274 180 9485 7646 1839 194
परजब Punjab 5575 5575 0 00 34414 34401 13 00
िजरसथजन Rajasthan 6202 6201 0 00 38594 38434 160 04
उतति परिश Uttar Pradesh 10211 10124 86 08 65349 64836 513 08
उततिजखड Uttarakhand 1162 1149 13 11 7311 7229 82 11
उततरी कषतर Northern Region 33405 33008 398 12 211725 208939 2786 13
छततीसगढ़ Chhattisgarh 2403 2388 15 06 13665 13638 27 02
गरिजत Gujarat 10122 10122 0 00 59146 59132 14 00
मधय परिश Madhya Pradesh 5492 5491 1 00 32552 32551 1 00
महजिजषटर Maharashtra 13615 13612 3 00 80266 80260 6 00
िमन औि दिउ Daman amp Diu 221 221 0 00 1306 1306 0 00
िजिि व नगि हवली Dadra amp Nagar Haveli 551 551 0 00 3204 3204 0 00
गोवज Goa 339 339 0 00 2131 2128 2 01
पशचिमी कषतर Western Region 32742 32723 19 01 192270 192220 50 00
आनधर परिश Andhra Pradesh 5294 5287 7 01 31518 31480 37 01
तलगजनज Telangana 6279 6272 8 01 31503 31463 40 01
कनजाटक Karnataka 5701 5693 8 01 33269 33225 45 01
किल Kerala 2050 2026 24 12 12140 12063 76 06
तममल नजड Tamil Nadu 8971 8959 12 01 57131 57065 66 01
पडचिी Puducherry 226 224 2 08 1438 1431 7 05
लकष-दवीप Lakshadweep 4 4 0 0 23 23 0 0
दकषकषणी कषतर Southern Region 28520 28460 60 02 166998 166727 271 02
बबहजि Bihar 2839 2793 46 16 16400 16213 188 11
िजमोिि घजटी ननगम DVC 1901 1750 151 79 11384 11130 254 22
झजिखणड Jharkhand 740 723 17 22 4321 4252 69 16
ओडडशज Odisha 2921 2918 3 01 17077 17058 19 01
पशशचम बगजल West Bengal 4902 4879 23 05 28804 28681 123 04
मसशककम Sikkim 39 39 0 01 239 239 0 01
अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 67 173 162 12 67
परवी कषतर Eastern Region 13341 13102 240 18 78225 77573 652 08
अरणजचल परिश Arunachal Pradesh 74 73 1 10 435 429 6 14
असम Assam 950 914 36 38 5320 5094 226 43
मणणपि Manipur 70 69 1 11 414 408 6 15
मघजलय Meghalaya 150 150 0 01 896 896 0 01
ममज़ोिम Mizoram 58 57 1 12 302 297 5 16
नजगजलड Nagaland 80 72 8 104 464 414 50 108
बिपिज Tripura 192 191 1 07 895 878 17 19
उततर-परवी कषतर North-Eastern Region 1575 1527 48 31 8726 8415 311 36
समपणण भारत All India 109584 108819 765 07 657944 653873 4071 06
Energy not Supplied Energy not Supplied
ससतबर2018 September2018 अपरल2018 -ससतबर2018 April2018 to September2018
ऊरजा पनत ा म कमी ऊरजा पनत ा म कमी
Excludes energy exported to Bangladesh
राजयState
ऊराण वरवदयत आपरतण शथिरत ररपोरण (सशोधित) Energy Power Supply Position Report (Revised)
25
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
File NoCEA-CH-14-1142018-Coordination Division
अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met
कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )
चडीगढ़ Chandigarh 293 293 0 00 369 369 0 00
दिलली Delhi 5358 5358 0 00 7016 7016 0 00
हरियजणज Haryana 9008 9008 0 00 10270 10270 0 00
दहमजचल परिश Himachal Pradesh 1466 1466 0 00 1479 1479 0 00
रमम कशमीि Jammu amp Kashmir 2951 2361 590 200 2951 2361 590 200
परजब Punjab 11405 11405 0 00 12638 12638 0 00
िजरसथजन Rajasthan 10612 10612 0 00 11698 11698 0 00
उतति परिश Uttar Pradesh 18346 18121 225 12 20498 20062 436 21
उततिजखड Uttarakhand 1996 1996 0 00 2143 2143 0 00
उततरी कषतर Northern Region 56407 55649 758 13 63166 61726 1440 23
छततीसगढ़ Chhattisgarh 4404 4075 328 75 4404 4136 268 61
गरिजत Gujarat 16963 16963 0 00 17053 16963 90 05
मधय परिश Madhya Pradesh 8811 8771 41 05 8811 8775 36 04
महजिजषटर Maharashtra 22455 22349 106 05 23395 23254 141 06
िमन औि दिउ Daman amp Diu 357 356 1 02 357 356 1 02
िजिि व नगि हवली Dadra amp Nagar Haveli 816 815 1 01 816 815 1 01
गोवज Goa 596 596 0 00 596 596 0 00
पशचिमी कषतर Western Region 52933 52895 38 01 53841 52895 945 18
आनधर परिश Andhra Pradesh 9435 9416 19 02 9435 9416 19 02
तलगजनज Telangana 10815 10815 0 00 10815 10815 0 00
कनजाटक Karnataka 10103 10090 13 01 10690 10688 2 00
किल Kerala 3888 3638 251 64 4050 3997 53 13
तममल नजड Tamil Nadu 14556 14553 3 00 15029 14981 47 03
पडचिी Puducherry 390 372 17 45 420 400 19 46
लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0
दकषकषणी कषतर Southern Region 45542 45428 114 02 45946 45684 262 06
बबहजि Bihar 5050 5045 5 01 5050 5045 5 01
िजमोिि घजटी ननगम DVC 2641 2641 0 00 2874 2874 0 00
झजिखणड Jharkhand 1233 1233 0 00 1339 1284 55 41
ओडडशज Odisha 4906 4906 0 00 5357 5357 0 00
पशशचम बगजल West Bengal 8644 8639 5 01 9130 9123 7 01
मसशककम Sikkim 78 78 0 00 90 90 0 00
अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7
परवी कषतर Eastern Region 22110 22100 10 00 22470 22290 180 08
अरणजचल परिश Arunachal Pradesh 132 130 2 15 138 133 5 37
असम Assam 1865 1809 56 30 1865 1809 56 30
मणणपि Manipur 184 182 2 13 193 186 7 36
मघजलय Meghalaya 317 317 0 00 371 368 2 07
ममज़ोिम Mizoram 95 93 2 23 103 98 4 41
नजगजलड Nagaland 142 138 5 32 156 138 18 117
बिपिज Tripura 296 293 3 10 298 293 5 17
उततर-परवी कषतर North-Eastern Region 2921 2850 71 24 2967 2850 117 39
समपणण भारत All India 177022 175528 1494 08 177022 175528 1494 08
26
मजग की पनता म कमी मजग की पनता म कमी Demand not MetDemand not Met
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
Excludes the supply to Bangladesh
अधिकतम वरवदयत आपरतण शथिरत ररपोरण (सशोधित) Peak Power Supply Position Report (Revised)
आकड़ मगज वजट नट Figures in MW net
राजयStateससतबर2018 September2018 अपरल2018 -ससतबर2018 April2018 to September2018
File NoCEA-CH-14-1142018-Coordination Division
अकरबर2018 October2018अपरल2018 -अकरबर2018 April2018 to October2018
उततरी कषतर Northern Region
चडीगढ़ Chandigarh Data not received Data not received
दिलली Delhi
हरियजणज Haryana
दहमजचल परिश Himachal Pradesh
रमम कशमीि Jammu amp Kashmir Data not received Data not received
परजब Punjab
िजरसथजन Rajasthanउतति परिश Uttar Pradesh
उततिजखड Uttarakhand
पशचिमी कषतर Western Region
छततीसगढ़ Chhattisgarh
गरिजत Gujarat
मधय परिश Madhya Pradesh
महजिजषटर Maharashtra
गोवज Goa
दकषकषणी कषतर Southern Region
आनधर परिश Andhra Pradesh
तलगजनज Telangana
कनजाटक Karnataka
किल Kerala
तममल नजड Tamil Nadu
पडचिी Puducherryपरवी कषतर Eastern Region
बबहजि Bihar
झजिखणड Jharkhand
ओडडशज Odisha
पशशचम बगजल West Bengal
N
o No
tified
Cuts
N
o No
tified
Cuts
27
अकरबर 2018 म इडथरीर पर वरवदयत करौती का वरवरवरण Notified Power CutsRestrictions on Industries during October2018
राजय कषतर State Regionऊराणमाग करौती EnergyDemand Cut
No Notified Cuts No Notified Cuts
File NoCEA-CH-14-1142018-Coordination Division
अकरबर2018 October2018अपरल2018 -अकरबर2018 April2018 to October2018
उततरी कषतर Northern Region
चडीगढ़ Chandigarh Data not received Data not received
दिलली Delhi Data not received Data not received
हरियजणज Haryana 940 hrsday 0709 - 0950 hrsday
दहमजचल परिश Himachal Pradesh No cut imposed on agriculture consumers and uninterrupted
power is being supplied to agriculture sector
HPSEBL has only 2 agriculture consumers and uninterrupted
power is being supplied to agriculture sector
रमम कशमीि Jammu amp Kashmir Data not received Data not received
परजब Punjab 0507 hrsday 0349 - 0844 hrsday
िजरसथजन Rajasthan 0630 hrsday 0630 hrsday
उतति परिश Uttar Pradesh 1825 hrsday 1814 - 1858 hrsday
उततिजखड Uttarakhand 2350 hrsday 2128 - 2357 hrsday
पशचिमी कषतर Western Region
छततीसगढ़ Chhattisgarh 18hoursday 18 hrsday
गरिजत Gujarat 805 hrsday 805 hrsday
मधय परिश Madhya Pradesh Three-Phase Supply(Irrigation)-947 hrs day
Three-Phase (Mixed) Supply - 2311 hrs day
Three-Phase Supply(Irrigation)- 0933 - 0947 hrs day Three-
Phase (Mixed) Supply - 2300 - 2320 hrs day
महजिजषटर Maharashtra Three-Phase Supply(Irrigation)- 9 hrs day
Three-Phase (Mixed) Supply - 24 hrs day
Three-Phase Supply(Irrigation)- 9 hrs day
Three-Phase (Mixed) Supply - 24 hrs day
गोवज Goa No restriction No restriction
दकषकषणी कषतर Southern Region
आनधर परिश Andhra Pradesh 07 hrsday 07 hrsday
तलगजनज Telangana 24 hoursday 24 hoursday
कनजाटक Karnataka 6 hrsday 6 hrsday
किल Kerala No Restrictions No Restrictions
तममल नजड Tamil Nadu 9 hrsday (6 hrs during day time and 3 hrs during night time) 9 hrsday (6 hrs during day time and 3 hrs during night time)
पडचिी Puducherry No Restrictions No Restrictions
परवी कषतर Eastern Region
बबहजि Bihar About 18 hrsday About 18 hrsday
झजिखणड Jharkhand About 20 hrsday About 20 hrsday
ओडडशज Odisha 24 hrsday 24 hrsday
पशशचम बगजल West Bengal About 23 hrsday About 23 hrsday
28
अकटबर 2018 कषि कषतर को षिदयत आपरति का षििरण Power Supply to Agricultural Sector during October2018
राजय कषतर State Regionऔसत वरवदयत आपरतण घनरो म Average Hours of Supply
On segregated feeders
File NoCEA-CH-14-1142018-Coordination Division
SNo Contents Page
1 Growth of Installed Capacity since 6th Plan 29
2 Progress of Transmission Sector since 6th Plan 30
3 All India Yearly Coal consumption for Power Generation (Utilities)
4 All India Annual Per Capita Consumption of Electricity since -2006
5 Average cost of power supply amp Average realisation (Paisakwh)
6 Growth of Rural Electrification amp Pump Sets Energisation
7 Status of Hydro Schemes Cleared by the CEA in Oct-2018
Section G - Growth of Power Sector
31
32
File NoCEA-CH-14-1142018-Coordination Division
(In MW)
Coal Gas Diesel Total
End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472
End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634
End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537
End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596
End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921
End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703
End of 12th Plan 19216288 2532938 83763 21832988 6780 4447842 50018 31960630
Up to Oct-2018 19599250 2493722 837629 22176734 6780 4548742 7201281 34604757
Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-17) = 51529 MW
Electricity Generation (MU) Targets and Achievements for 2016-17
Coal Gas Diesel Nuclear Hydro Res Total
1959925 2493722 837629 678000 454874 72012805 22925174
29
1 Growth of Installed Capacity Since 6th Plan
Plan YearThermal
Nuclear Hydro RES (MNRE) Total
Total Installed Capacity 34604757 MW
Coal Gas Diesel Nuclear Hydro Res
File NoCEA-CH-14-1142018-Coordination Division
Progress of Transmission Sector in the Country up to Oct 2018
1 TRANSMISSION LINES (All fig in CKM)
At the end of
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
6th plan 0 0 0 0 0 0 0 0 0 0 0 0 1831 4198 0 6029 1641 44364 0 46005 3472 48562 0 52034
7th plan 0 0 0 0 0 0 0 0 0 0 0 0 13068 6756 0 19824 4560 55071 0 59631 17628 61827 0 79455
8th plan 0 0 0 0 1634 0 0 1634 0 0 0 0 23001 13141 0 36142 6564 73036 0 79600 31199 86177 0 117376
9th plan 0 0 0 0 3234 1504 0 4738 751 409 0 1160 29345 20033 0 49378 8687 88306 0 96993 42017 110252 0 152269
10th plan 0 0 0 0 4368 1504 0 5872 1775 409 0 2184 48708 24730 0 73438 9444 105185 0 114629 64295 131828 0 196123
11th Plan 0 0 0 0 5948 1504 1980 9432 4839 411 0 5250 71023 30191 5605 106819 10140 125010 830 135980 91950 157116 8415 257481
12th Plan 6124 0 0 6124 5948 1504 1980 9432 25465 1177 4598 31240 92482 48240 17065 157787 11014 151276 978 163268 141033 202197 24621 367851
13th Plan (Up
to Mar2018)6124 0 0 6124 5948 1504 1980 9432 28666 1512 4881 35059 98247 54286 19067 171600 11258 156497 1000 168755 150243 213799 26928 390970
13th Plan (Up
to Sep-18)6124 0 0 6124 5948 1504 1980 9432 30952 1512 5059 37523 99683 56069 20662 176414 11318 160958 1000 173276 154025 220043 28701 402769
27150
75050
47900
118050
90650
30
IR addition in 12th Plan (up to
March 2017)
Total IR (up to Oct-18)
IR at the end of 11th Plan
IR at the end of 12th Plan
Envisaged IR Capacity at the end
of 13th Plan
Grand Total
Note - The figure upto the end of 10th plan in for stringing progress including the lines not commissioned Now only commissioned lines are reckoned Accordingly the figure for 10th plan (end) may read as 187555 after adjusting with (-) 10852 Ckm
Inter-regional Power Transfer Capacity
plusmn 800 kV HVDC plusmn 500 kV HVDC 765 kV 400 kV 220 kV
File NoCEA-CH-14-1142018-Coordination Division
2004-05 27800
2005-06 28100
2006-07 30200
2007-08 33000
2008-09 35500
2009-10 36700
2010-11 38700
2011-12 41756
2012-13 45460
2013-14 48940
2014-15 53040
2015-16 54590
2016-17 57430
2017-18 60800
Year
2005-06
2006-07
2007-08
2008-09
2009-10
2010-11
2011-12
2012-13
2013-14
2014-15
2015-16
2016-17
2017-18
2004-05 254 209 7568
2005-06 260 221 7636
2006-07 276 227 7423
2007-08 293 239 7727
2008-09 340 263 8713
2009-10 355 268 8870
2010-11 398 303 11975
2011-12 455 330 13514
2012-13 501 376 14867
2013-14 518 175
2014-15 520
6719
7171
3 All India yearly Coal Consumption for Power Generation (Utilities)
YEARCoal Consumption
Million Tonnes
4 All India Annual per Capita consumption of Electricity Since 2006
Per Capita Consumption ( kWh)
6314
(GrossGen+ Net Import) Mid-year population
5 Average cost of power supply amp average realization ( paiseKWH )
Yearcost of supply
(paiseunit)
Realization(paiseunit)
Including AgricultureOnly
Agriculture
1149
7335
7786
91441
8188
88363
957
1010
1075
1122
File NoCEA-CH-14-1142018-Coordination Division
Source- PFC Reports on the performance of State Power Utilities 31
File NoCEA-CH-14-1142018-Coordination Division
Sl
NoExecuting Agency
Installed
Capacity (MW)Cost (Rs crore)
Date of
Clearance
32
No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification
since 2004-05
65291374575 296361511th Plan
Cumu upto End of 11th Plan
596556 21212860
557439Cummulative up to end of 12th Plan
46708
18423975
499150
2003-042004-05
5743
9769
Cumu upto End of 10th Plan
010407 to 310308
010410 to 310311557976840909
010411 to 310312
412667
86293726
3207
482864
12632
1576036
4451722594
15455554
2314176
397343611750
2093311060316074
65109527813884
6 Growth Of Rural Electrification amp Pumpsets Energisation
Plan Year
9th Plan2002-03
134092626
4111
Pump Sets Energised Villages Electricfied (Nos)
2001-02
284064367244
1218
27801997-981998-991999-002000-01
297594
010408 to 310309010409 to 310310
10th Plan
2005-062006-07
322968331020
Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as
Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received
from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made
available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified
villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is
independent of the earlier published reports
No Hydro Electric Project has been issued concurrenceAppraisal letter by CEA during October 2018
7 Status of Hydro Schemes Cleared by the CEA in Oct-2018
Name of Scheme
File NoCEA-CH-14-1142018-Coordination Division
SN Contents Page
1 Rate of sale of power for the year 2016-17 33-41
RATE OF SALE OF POWER FOR THE YEAR 2016-17
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) NORTHERN REGION
CENTRAL SECTOR
BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 18000 66900 19800
CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 54000 222400 21600
CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 30000 144400 19600
CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 23100 91700 42600
PARBATI - III HPS NHPC LTD HYDRO-HYDRO 52000 68200 54800
DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 28000 95600 30000
CHUTAK NHPC LTD HYDRO-HYDRO 4400 22000 79800
DULHASTI HPS NHPC LTD HYDRO-HYDRO 39000 228000 56400
SALAL HPS NHPC LTD HYDRO-HYDRO 69000 342300 11000
TANAKPUR HPS NHPC LTD HYDRO-HYDRO 9420 43000 29600
URI HPS -I NHPC LTD HYDRO-HYDRO 48000 280300 16000
URI HPS - II NHPC LTD HYDRO-HYDRO 24000 147300 48600
NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 4500 24600 88200
SEWA - II NHPC LTD HYDRO-HYDRO 12000 47100 43400
ANTA CCPP NTPC LTD THERMAL-GASN 41930 67539 32400
AURAIYA CCPP NTPC LTD THERMAL-GASN 66336 53501 39100
BADARPUR TPS NTPC LTD THERMAL-COAL 70500 159153 44800
DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 84000 296170 42300
DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 98000 526686 46300
DADRI CCPP NTPC LTD THERMAL-GASHSD 82978 227469 33000
FARIDABAD CCPP NTPC LTD THERMAL-GASN 43159 115577 30800
RIHAND STPS I NTPC LTD THERMAL-COAL 100000 596766 24500
RIHAND STPS II NTPC LTD THERMAL-COAL 100000 737069 24600
RIHAND STPS III NTPC LTD THERMAL-COAL 100000 706546 30600
SINGRAULI STPS NTPC LTD THERMAL-COAL 200000 1394068 20400
TANDA TPS NTPC LTD THERMAL-COAL 44000 295438 40800
UNCHAHAR TPS I NTPC LTD THERMAL-COAL 42000 256454 39800
UNCHAHAR TPS II NTPC LTD THERMAL-COAL 42000 273577 38900
UNCHAHAR TPS III NTPC LTD THERMAL-COAL 21000 142780 43000
KOLDAM NTPC LTD HYDRO-HYDRO 80000 363260 43600
NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 303575 25841
RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 108000 668677 35374
NJHPS SJVNL HYDRO-HYDRO 150000 699496 23820
RAMPUR HPS SJVNL HYDRO-HYDRO 41202 195982 32260
TEHRI HPP THDC HYDRO-HYDRO 100000 272543 51800
KOTESHWAR HEP THDC HYDRO-HYDRO 40000 106244 53400
IGSTPS JHAJJAR ARAVALI P CPL THERMAL-COAL 150000 510429 49490
NEYVELI BARSINGSAR NEYVELI LIG CORP LTD THERMAL-LIG 25000 127520 38040
STATE SECTOR
PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 21000 14222 48200
PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 21000 19205 48400
PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 25000 102257 42600
PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 25000 62107 41800
DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 60000 312213 41000
RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 120000 35767442200
WYC HYDEL STATION HPGCL HYDRO-HYDRO 6240 20365 24900
GIRI POWER HOUSE HPSEB HYDRO-HYDRO 6000 13958 7600
ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 1695 5467 11900
BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 12000 18528 6700
GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 2250 7462 22500
BASSI POWER HOUSE HPSEB HYDRO-HYDRO 6600 29649 7500
BINWA POWER HOUSE HPSEB HYDRO-HYDRO 600 2749 19300
ANNEXURE-I
RATE OF SALE OF POWER FOR THE YEAR 2016-2017
Page 33
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) GAJ POWER HOUSE HPSEB HYDRO-HYDRO 1050 2914 26700
BANER POWER HOUSE HPSEB HYDRO-HYDRO 1200 2864 16200
HOLI POWER HOUSE HPSEB HYDRO-HYDRO 300 616 22500
THIROT POWER HOUSE HPSEB HYDRO-HYDRO 450 1126 22500
KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 1200 3064 22500
LARJI POWER HOUSE HPSEB HYDRO-HYDRO 12600 53677 23700
NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 250 750 31000
CHABA POWER HOUSE HPSEB HYDRO-HYDRO 175 465 23300
RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 150 101 13400
SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 200 000 22500
KILLAR HPSEB HYDRO-HYDRO 030 050 22500
BHABA AUGUMENP H HPSEB HYDRO-HYDRO 450 1276 22500
BS CHAMBA HPSEB HYDRO-HYDRO 045 099 19500
GUMMA HPSEB HYDRO-HYDRO 300 423 22500
GAS TURBINE POWER STATION IPGCL THERMAL-GAS 27000 67233 39300
PPS-I PPCL THERMAL-GAS 33000 175905 38300
PPS-III PPCL THERMAL-GAS 137120 196879 36100
LOWER JHELUM JampKPDD HYDRO-HYDRO 10500 60214 5100
UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 2260 10514 6300
UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 10500 44202 8500
GANDHARBAL JampKPDD HYDRO-HYDRO 1500 8925 4700
KARNAH MPH JampKPDD HYDRO-HYDRO 200 1122 31000
CHENANI I JampKPDD HYDRO-HYDRO 2330 10892 6600
CHENANI II JampKPDD HYDRO-HYDRO 200 1188 9300
CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 750 3634 14200
IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 375 2108 18500
IGO MERCHELLONG JampKPDD HYDRO-HYDRO 300 1572 29700
PAHALGAM MHP JampKPDD HYDRO-HYDRO 450 1713 32900
MARPACHOO JampKPDD HYDRO-HYDRO 075 375 29800
HAFTAL JampKPDD HYDRO-HYDRO 100 483 28700
SANJAK JampKPDD HYDRO-HYDRO 126 441 36000
SEWA-III JampKPDD HYDRO-HYDRO 900 3273 20200
BHADERWAH JampKPDD HYDRO-HYDRO 150 935 8900
BAZGO JampKPDD HYDRO-HYDRO 030 108 33300
SUMOOR JampKPDD HYDRO-HYDRO 010 045 35400
HUNDER JampKPDD HYDRO-HYDRO 040 176 26200
STAKNA JampKPDD HYDRO-HYDRO 400 1933 4100
KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 124000 662879 31360
SURATGARH TPS RRVUNL THERMAL-COAL 150000 402328 41730
CHHABRA TPS 1amp 2 RRVUNL THERMAL-COAL 50000 305946 36700
CHHABRA TPS 3 RRVUNL THERMAL-COAL 25000 151536 36700
CHHABRA TPS 4 RRVUNL THERMAL-COAL 25000 155896 36700
RAMGARH GT POWER PROJECT RRVUNL THERMAL-COAL 22050 43177 41800
RAMGARH GAS T P PROJECT 3 RRVUNL THERMAL-GAS 5000 93615 41800
DHOLPUR C C POWER PROJECT RRVUNL THERMAL-R-LNG 33000 9486 46110
MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 14000 20855 34192
MINI MICRO HYDEL (MMH) P S RRVUNL HYDRO-HYDRO 2385 851 37800
KALISINDH TPP 1 RRVUNL THERMAL-COAL 60000 341543 45000
KALISINDH TPP 2 RRVUNL THERMAL-COAL 60000 211588 45000
KHARA HEP UPJVNL HYDRO-HYDRO 7200 26654 7200
MATATILLA HEP UPJVNL HYDRO-HYDRO 3060 12219 6500
OBRA HEP UPJVNL HYDRO-HYDRO 9900 21517 6300
RIHAND UPJVNL HYDRO-HYDRO 30000 57369 5500
ANPARA A TPS UPRVUNL THERMAL-COAL 63000 317536 27000
ANPARA B TPS UPRVUNL THERMAL-COAL 100000 705605 22700
ANPARA D UPRVUNL THERMAL-COAL 100000 300158 39800
HARDUAGANJ TPS UPRVUNL THERMAL-COAL 16500 45817 49200
HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 50000 304389 46600
OBRA A TPS UPRVUNL THERMAL-COAL 28800 13158 34000
OBRA B TPS UPRVUNL THERMAL-COAL 100000 328124 21900
Page 34
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) PANKI TPS UPRVUNL THERMAL-COAL 21000 66488 50300
PARICHHA TPS UPRVUNL THERMAL-COAL 22000 38762 49400
PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 42000 231931 45600
PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 50000 276722 50400
CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 24000 70845 8290
CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 14400 75366 8390
DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 3375 9595 12080
DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 5100 18701 10520
KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4140 17359 12330
KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 12000 33001 9420
KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 3000 11953 8320
TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 9000 33983 12460
MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 30400 124510 16110
RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 19800 17897 10550
MPUR UTTARAKHAND JVNL HYDRO-HYDRO 930 5121 19200
PATHRI UTTARAKHAND JVNL HYDRO-HYDRO 2040 11636 14200
GALOGI UTTARAKHAND JVNL HYDRO-HYDRO 300 648 12500
PRIVATE SECTOR
MGTPP CLP INDIA PVT LTD THERMAL-COAL 132000 268902 41940
SHRINAGAR HEP ALAKNANDA HPCL HYDRO-HYDRO 33000 127414 48800
GAMA INFRAPROP CCPP GAMA INFRAPROP PVT THERMAL-GAS 22500 52686 47000
PPGCL (BARA) JP POWER VENTURES LTD THERMAL-COAL 198000 448200 38500
MALANA HEP MALANA PCL HYDRO-HYDRO 8600 26354 29792
MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 10000 30369 32580
ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 19200 56347 36079
KASHANG HEP H P PCL HYDRO-HYDRO 19500 5034 29200
BASPA-II HEP HBPCL HYDRO-HYDRO 30000 132769 13600
KARCHAM WANGTOO HEP HBPCL HYDRO-HYDRO 100000 434386 36600
RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 108000 582600 43700
RITHALA COMBI CY POWER PLANT TATA POWER DDL THERMAL-GAS 9480 000 11900
RAJPURA TPS NABHA POWER LTD THERMAL-GAS 140000 901484 39000
TALWANDI SABO POWER LTD TALWANDI SABO POWER LTD THERMAL-COAL 198000 636040 49548
ROJA THERMAL POWER STATION ROJA POWER SCL THERMAL-COAL 120000 727200 43400
KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 34400 63400
BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 36000 62600
MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 38200 60800
UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 37900 61500
KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 42300 58800
LALITPUR PGCL BAJAJ ENERGY PVT LTD THERMAL-COAL 198000 359400 47300
PRAYAGRAJ PGCL PRAYAGRAJ PGCL THERMAL-COAL 132000 448200 38595
KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 132000 783182 33438
WESTERN REGION
CENTRAL SECTOR
INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 100000 325333 23892
OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 52000 141663 34001
GANDHAR CCPP NTPC LTD THERMAL-GAS 65739 221924 28700
KAWAS CCPP NTPC LTD THERMAL-GASN 65620 167929 27000
KORBA I amp II NTPC LTD THERMAL-COAL 210000 1499171 20500
KORBA III NTPC LTD THERMAL-COAL 50000 358746 26600
SIPAT STPS I NTPC LTD THERMAL-COAL 198000 1479902 26800
SIPAT STPS II NTPC LTD THERMAL-COAL 100000 766549 26500
VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 126000 693142 25800
VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 100000 608781 23800
VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 100000 673475 27600
VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 100000 655924 32900
VINDHYACHAL STPS V NTPC LTD THERMAL-COAL 50000 328265 31700
MOUDA I NTPC LTD THERMAL-COAL 100000 343130 44500
MOUDA Ii NTPC LTD THERMAL-COAL 66000 40637 39900
RATNAGIRI GAS amp POWER PVT LTD RGPPL THERMAL-GAS 196708 442485 47000
KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 000 24729
TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 32000 201227 10740
Page 35
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 365122 19069
TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 787444 29324
STATE SECTOR
GSEG-HAZIRA15610 MW GUJARAT S ENEGEN LTD THERMAL-GAS 15610 1805 28200
GSEG-HAZIRA35143 MW GUJARAT S ENEGEN LTD THERMAL-GAS 35130 22276 51300
GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 21978 51800
AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 13929 26100
KORBA TPS EAST CSPGCL THERMAL-COAL 44000 198673 33880
DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 365808 27570
KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 316500 30420
HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 532878 19410
CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 515 58300
MTTPS CHAMPA U-I CSPGCL THERMAL-COAL 50000 220376 39000
MTTPS CHAMPA U-II CSPGCL THERMAL-COAL 50000 23709 10000
SHP GANGREL CSPGCL HYDRO-HYDRO 1000 2350 36790
BANGO HEP CSPGCL HYDRO-HYDRO 12000 14662 8900
MHP KORBA WEST CSPGCL HYDRO-HYDRO 170 859 38190
SIKASAR HEP CSPGCL HYDRO-HYDRO 700 418 26870
DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8843 74500
DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 19446 51500
GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 66388 71600
GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127488 41300
KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 96072 43900
KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 29841 56400
SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 184966 58800
UKAI 1-5 GSECL THERMAL-COAL 85000 204891 46900
UKAI TPS 6 GSECL THERMAL-COAL 50000 284448 48200
WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 271999 58300
WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 82808 44100
KADANA HPS GSECL HYDRO-HYDRO 24200 34433 16800
UKAI HPS GSECL HYDRO-HYDRO 30500 40585 6100
TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 123000 11500
BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 8900 10900
BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 7200 27500
JHINNA HPS MPPGCL HYDRO-HYDRO 2000 9700 18500
RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 44300 3400
GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 17300 4600
SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 4100 16900
MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 14600 27000
PENCH HPS MPPGCL HYDRO-HYDRO 16000 23700 8100
RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 3000 16900
AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 134400 35100
SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 283800 38700
SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 344600 34300
SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 111600 61600
SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 211800 58000
SSTPS PH-I MPPGCL THERMAL-COAL 120000 233100 84300
BHUSAWAL TPS MSPGCL THERMAL-COAL 142000 566258 51100
CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1365682 33700
KHAPERKHEDA MSPGCL THERMAL-COAL 134000 706207 39100
KORADI TPS MSPGCL THERMAL-COAL 62000 443206 42000
NASIK TPS MSPGCL THERMAL-COAL 63000 297275 47000
PARLI TPS MSPGCL THERMAL-COAL 113000 175934 71600
PARAS MSPGCL THERMAL-COAL 50000 267931 38700
URAN CCPP MSPGCL THERMAL-GAS 67200 320330 30600
KOYANA MSPGCL HYDRO-HYDRO 195600 328155 13100
SMALL HYDRO POWER PLANTS MSPGCL HYDRO-HYDRO 45400 93062 30500
BHIRA MSPGCL HYDRO-HYDRO 8000 10046 8400
TILLARI MSPGCL HYDRO-HYDRO 8900 10584 3100
SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 233298 20500
SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 87633 20500
PRIVATE SECTOR
Page 36
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 81282 46750
JNSTPP(JAYPEE NIGRIE) JP POWER VENTURES LTD THERMAL-COAL 132000 726695 29310
MB POWER MB POWER THERMAL-COAL 120000 345632 38310
ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 754922 28671
ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 780761 23495
ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 198000 1263784 32090
ADANI POWER MAHARA ADANI POWER LTD THERMAL-COAL 330000 1666191 34124
AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 170065 36827
SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 252035 45129
ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 458551 36000
ESSAR POWER MP LTD ESSAR POWER MP LTD THERMAL-COAL 60000 243040 28600
VEDANTA LTD (P P -I) VEDANTA LTD THERMAL-GAS 3000 15044 24000
VEDANTA LTD (P P -II) VEDANTA LTD THERMAL-GAS 3000 21293 24000
PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 8234600 24000
165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 5850 64390
145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 68717 40349
SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 132655 28776
SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 144686 38567
MUNDRA UMPPCOASTAL GUJARAT POWER
LTD THERMAL-IMP COAL 400000 2530300
23900
LANCO AMARKANTAK TPP PATHADIH
U-ILANCO AMARKAN POWER LTD THERMAL-COAL 30000 195500
29200
LANCO AMARKANTAK TPP PATHADIH
U-IILANCO AMARKAN POWER LTD THERMAL-COAL 30000 206900
27600
BARADARHA TPS D B POWER LTD THERMAL-COAL 120000 677373 29200
JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 405000 28900
JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 453000 40500
DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 339437 40700
TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 293400 44000
TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 137200 37000
TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 174900 44000
BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 92900 14100
BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23700 34300
KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 27600 48300
CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2530300 23900
BHANDARDRA HEP -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 2475 54900
SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 161400 26500
SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 445000 39000
SOTHERN REGION
CENTRAL SECTOR
NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 325699 54820
NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 305532 39880
NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 998805 38510
NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 113016 54070
NEYVELI TAMILNADU POWER LTD JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 625274 42200
VALLUR TPS NTPC TECL THERMAL-COAL 150000 856438 42350
R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 1493 84300
RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1502919 29400
RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 341291 31800
SIMHADRI I NTPC LTD THERMAL-COAL 100000 688382 36800
SIMHADRI II NTPC LTD THERMAL-COAL 100000 663657 43400
KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 593110 31324
MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 291625 21764
KKNPP-1 amp 2 NPCIL NUCLEAR-NUCLEAR 200000 572609 40948
MINICOY LAKSHADEEP THERMAL-DIESEL 340 770 29600
KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1097 29600
AMINI LAKSHADEEP THERMAL-DIESEL 265 509 29600
ANDROTT LAKSHADEEP THERMAL-DIESEL 219 524 29600
KALPENI LAKSHADEEP THERMAL-DIESEL 175 356 29600
AGATTI LAKSHADEEP THERMAL-DIESEL 195 658 29600
KADMAT LAKSHADEEP THERMAL-DIESEL 190 414 29600
KILTAN LAKSHADEEP THERMAL-DIESEL 150 269 29600
CHETLET LAKSHADEEP THERMAL-DIESEL 100 139 29600
BITRA LAKSHADEEP THERMAL-DIESEL 043 024 29600
BANGARAM LAKSHADEEP THERMAL-DIESEL 018 009 29600
Page 37
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) STATE SECTOR
Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 721811 46500
Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 50000 336142 46500
RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 237358 46500
RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 239926 46500
RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 124500 46500
SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 62109 46500
UPPER SILERU APGENCO HYDRO-HYDRO 24000 33000 46500
LOWER SILERU APGENCO HYDRO-HYDRO 46000 81066 46500
DONKARAI APGENCO HYDRO-HYDRO 2500 6007 46500
PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 1262 46500
CHETTIPETA APGENCO HYDRO-HYDRO 100 214 46500
MUCHKUND APGENCO HYDRO-HYDRO 12000 37571 46500
NAGARJUNASAGAR RCPH APGENCO HYDRO-HYDRO 9000 606 46500
TUNGABHADRA HES amp HAMPI(AP
Share)
APGENCO HYDRO-HYDRO 7200 6100 46500
KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 352232 42600
KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 288131 32500
KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 319272 46500
RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 40073 44300
KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 308317 46000
KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 308963 51300
SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 61004 76600
NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 17960 75300
PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 20873 58300
POCHAMPAD-I TSPGENCO HYDRO-HYDRO 2700 5455 29800
POCHAMPAD-II TSPGENCO HYDRO-HYDRO 900 1932 40700
NIZAMSAGAR TSPGENCO HYDRO-HYDRO 1000 1126 53400
RAICHUR TPS 1 to 7 KPCL THERMAL-COAL 147000 890866 43800
RAICHUR TPS 8 KPCL THERMAL-COAL 25000 159523 48200
BELLARI TPS 1 KPCL THERMAL-COAL 50000 318679 51100
BELLARI TPS 2 KPCL THERMAL-COAL 50000 232347 55600
BELLARI TPS 3 KPCL THERMAL-COAL 70000 47565 34400
BHADRA PH KPCL HYDRO-HYDRO 3920 2369 45900
GERUSUPPA PH KPCL HYDRO-HYDRO 24000 26990 22000
GHAT PRABHA HEP KPCL HYDRO-HYDRO 3200 4777 25300
KADRA HPS KPCL HYDRO-HYDRO 15000 16889 26800
NAGJHARI KPCL HYDRO-HYDRO 90000 155159 9800
KODASALLI DPH KPCL HYDRO-HYDRO 12000 14854 19200
MUNIRA+MGH+SPH+SPH KPCL HYDRO-HYDRO 22640 48211 7900
SHARAVATHY HPS KPCL HYDRO-HYDRO 108550 276215 5400
ALMATTI DPH KPCL HYDRO-HYDRO 29000 39611 24600
VARAHI UGPH KPCL HYDRO-HYDRO 46000 71368 15600
IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 17196 15300
IDUKKI HPS KSEB HYDRO-HYDRO 78000 137905 15300
KAKKAD HPS KSEB HYDRO-HYDRO 5000 13063 15300
KALLADA HPS KSEB HYDRO-HYDRO 1500 4436 15300
KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 46544 15300
KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 635 15300
LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 30822 15300
MALANKARA HPS KSEB HYDRO-HYDRO 1050 2474 15300
MATTUPETTY KSEB HYDRO-HYDRO 200 230 15300
MALAMPUZHA KSEB HYDRO-HYDRO 250 063 15300
CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 864 15300
URUMI ST I amp II KSEB HYDRO-HYDRO 615 903 15300
LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 248 15300
NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7765 19625 15300
PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 16601 15300
PANNIAR HPS KSEB HYDRO-HYDRO 3240 6217 15300
PORINGALKUTHU KSEB HYDRO-HYDRO 3600 10052 15300
PORINGALKUTHU LBE KSEB HYDRO-HYDRO 1600 9438 15300
PEPPARA KSEB HYDRO-HYDRO 300 395 15300
POOZHITHODE KSEB HYDRO-HYDRO 480 1045 15300
Page 38
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) PEECHI KSEB HYDRO-HYDRO 125 040 15300
RANI-PERUNADU KSEB HYDRO-HYDRO 400 585 15300
SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 79783 15300
SENGULAM HPS KSEB HYDRO-HYDRO 5120 11558 15300
SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 16711 15300
VILANGAD KSEB HYDRO-HYDRO 750 1578 15300
BARAPOLE KSEB HYDRO-HYDRO 1500 1932 15300
VELLATHOOVAL KSEB HYDRO-HYDRO 360 305 15300
CHIM0NY KSEB HYDRO-HYDRO 250 156 15300
ADYANPARA KSEB HYDRO-HYDRO 350 501 15300
BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 554 15300
KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 3801 15300
KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 23132 32800
ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 14416 62280
METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 523970 62280
METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 321270 62280
NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 336575 62280
NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 591240 62280
TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 508966 62280
KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 30897 62280
VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 18720 90699 62280
KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 33593 62280
BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 1047 62280
PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 1250 62280
PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 330 62280
MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 4897 62280
MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 032 62280
KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15681 62280
KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 40608 62280
KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 21342 62280
KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 4717 62280
KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4322 62280
KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2399 62280
METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 4416 62280
METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 8035 62280
BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2187 62280
BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2359 62280
BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2511 62280
BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 1949 62280
BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 1819 62280
POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 172 62280
SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 241 62280
MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 026 62280
THIRUMOORTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 136 62280
PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 9309 62280
VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 353 62280
SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 4192 62280
PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 6571 62280
SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 1186 62280
SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6319 62280
ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 6122 62280
KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 28674 62280
SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 18381 62280
SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 4258 62280
KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 12680 62280
KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4201 62280
ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 000 62280
PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 19175 62280
AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 078 62280
BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 504 62280
BHAVANI KATTALAI (BKB)(IIIampIII BB I amp II)TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 5847 62280
PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 000 62280
Page 39
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) SRI DAMODARAM STPS APPDCL THERMAL-COAL 160000 808108 36300
PRIVATE SECTOR
KARUPPUR TANJORE LANCO TANJORE PCL THERMAL-GAS 12000 48096 28770
SIMHAPURI ENERGY LTD SIMHAPURI ENERGY LTD THERMAL-COAL 60000 143900 39100
JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 7111 45500
SBU 1 JSW ENERGY LTD
VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 26000 159100
43300
SBU 2 JSW ENERGY LTD
VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 60000 247900
42800
LANCO KPLLANCO KONDAPALLI POWER
LTDTHERMAL-GAS 36814 85060
25776
LANCO KPL STG -IILANCO KONDAPALLI POWER
LTDTHERMAL-GAS 36600 12979
46330
LANCO KPL STG -IIIALANCO KONDAPALLI POWER
LTDTHERMAL-GAS 37100 85710
46330
LANCO KPL STG -III BLANCO KONDAPALLI POWER
LTDTHERMAL-GAS 37100 43639
46330
HINDUJA NATIONAL PCL HINDUJA NATIONAL PCL THERMAL-COAL 104000 303000 38200
MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 121164 49940
UDUPI POWER COR LTD ADANI POWER LTD THERMAL-COAL 120000 754613 42500
SPECTRUM POWER GENERATION
LTD SPECTRUM PG LTD THERMAL-GASN 20525 9256812
34952
TAQA NEYVELI POWER COM PVT
LTD TAQA NEYVELI THERMAL-LIG 25000 5840
34500
ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 251000 51000
ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 207860 36800
GMR VEMAGIRI POWER GENERATION
LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 30117
46450
EASTERN REGION
CENTRAL SECTOR
MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 64675 53113
MTPS STAGE - II KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 39000 1432 69138
BOKARO `B` TPS DVC THERMAL-COAL 63000 145670 31539
MEJIA TPS U 1-3 DVC THERMAL-COAL 63000 348298 31552
MEJIA TPS U 4 DVC THERMAL-COAL 21000 116099 34997
MEJIA TPS U 5-6 DVC THERMAL-COAL 50000 276427 35976
MEJIA TPS U 7-8 DVC THERMAL-COAL 100000 552854 36991
DURGAPUR STEEL TPS DVC THERMAL-COAL 100000 665550 39323
DURGAPUR TPS DVC THERMAL-COAL 21000 59270 35416
RAGHUNATHPUR TPS DVC THERMAL-COAL 120000 201650 35326
MAITHON HYDEL STA DVC HYDRO-HYDRO 6320 12200 17984
CHANDRAPURA TPSU1-3 DVC THERMAL-COAL 42000 257610 35095
CHANDRAPURA TPSU7-8 DVC THERMAL-COAL 50000 306673 34987
KODERMA TPS DVC THERMAL-COAL 100000 380180 38131
PANCHET HPS DVC HYDRO-HYDRO 8000 13360 17984
TILLAYA HPS DVC HYDRO-HYDRO 400 1410 17984
RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34700 35400
TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 277300 23200
TLDP -III NHPC LTD HYDRO-HYDRO 13200 55400 62000
TLDP -IV NHPC LTD HYDRO-HYDRO 16000 60300 25600
FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 957219 33700
FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 308943 41000
BONGAINGAON TPS NTPC LTD THERMAL-COAL 25000 153663 58600
KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 542277 34200
KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 942591 34200
BARH-II NTPC LTD THERMAL-COAL 132000 728021 44500
TALCHER TPS NTPC LTD THERMAL-COAL 46000 335521 30100
TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 702319 25600
TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1436521 24700
STATE SECTOR
BTPS(RampM) BIHAR STATE PGCL THERMAL-COAL 22000 12142 39700
BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 98331 10602
HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 50593 9482
CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 19689 2605
RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 53192 6033
UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 147208 14637
Page 40
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 60353 4519
IB TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 288567 25000
J P H GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 210 038 61100
MEYONG CHU GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 400 1086 61100
TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 122667 38200
DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 214339 43321
KOLAGHAT THERMAL POWER
STATION
WEST BENGAL PDCL THERMAL-COAL 126000 538269 31603
BAKRESHWAR THERMAL POWER
PLANT
WEST BENGAL PDCL THERMAL-COAL 105000 634876 32154
BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 45000 166855 33299
SANTHALDIH THERMAL POWER
STATION
WEST BENGAL PDCL THERMAL-COAL 50000 336442 34932
SAGARDIGHI THERMAL POWER
PROJECT
WEST BENGAL PDCL THERMAL-COAL 160000 423121 34705
JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 20344 68900
RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 24559 68900
TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 4623 68900
PURULIA PUMPED STORAGE
PROJECT
WEST BENGAL SEDCL HYDRO-HYDRO 90000 108816 68900
MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2768 68900
PRIVATE SECTOR
CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 49474 20230
CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 555500 70200
HALDIA ENERGY HALDIA ENERGY LTD THERMAL-COAL 60000 371000 50400
DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3688 63400
KAMALANGA TPS GMR KAMALANGA ENERGY LTD THERMAL-COAL 105000547670
33300
ADHUNIK POWER U-1 ADHUNIK POWER THERMAL-COAL 27000 158 44060
ADHUNIK POWER U-2 ADHUNIK POWER THERMAL-COAL 27000 168 44250
VL-JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 332800 23622
JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 43000 45250
JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 71700 37030
JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 70700 35920
JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 71100 38870
JOJOBERA UNIT 5 TATA POWER COM LTD THERMAL-COAL 12000 79300 44560
JOJOBERA UNIT 6 TATA POWER COM LTD THERMAL-WHR 12000 83700 12840
IEL KALINGANAGAR U-I TATA POWER COM LTD THERMAL-WG 6750 33400 22500
IEL KALINGANAGAR U-II TATA POWER COM LTD THERMAL-WG 6750 34800 22500
MAITHON UNIT 1 amp 2 TATA POWER COM LTD THERMAL-COAL 105000 678000 36100
HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 27500 24340
HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 28400 24340
HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 15800 24310
NORTH EASTERN REGION
CENTRAL SECTOR
LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 74100 36600
AGARTALA GT NEEPCO THERMAL-GAS 13500 88611 27210
ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 153111 32310
DOYANG HEP NEEPCO HYDRO-HYDRO 7500 25598 49801
KOPILI HEP NEEPCO HYDRO-HYDRO 20000 98186 11491
KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 19582 20237
KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 10310 17968
RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 124093 22945
TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 10100 17344 39000
STATE SECTOR
HYDRO POWER (122 Stns) ITANAGAR GOVT OF ARUNACHAL
PRADESHHYDRO-HYDRO 6971 6217270
24600
KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39514 17337
LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 82327 36810
NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 33318 48290
MYNTRIANG SHEP ST II ASSAM POWER GENCO HYDRO-HYDRO 300 567 35776
LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 9130 49200
LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 012 49200
DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 022 49200
TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 000 49200
UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 4990 16000
UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 6476 37000
UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 16494 14600
UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 3600 9556 15000
SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 758 8000
MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44070 44800
KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 154 41400
TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 091 41400
MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 411 41400
MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 394 41400
KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 760 41400
SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 3264 41400
LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 044 41400
BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 18953 28000
ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 43585 28200
GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 4080 11100
Note
LIG Lignite N Naptha WHR Waste Heat Recovery
Page 41
File NoCEA-CH-14-1142018-Coordination Division
SN Contents Page
1 Executive summary of Target and Achievement of Substations during 2018-19 21(1)
2Sub Stations (220 kV and above) commissionedready for commisssioning during Oct-
201821(2)
Section D - Sub Stations
File NoCEA-CH-14-1142018-Coordination Division
1 Executive summary of Target and Achievement of Substations during 2018-19 As on Oct-18
(All figures in circuit MVA)
Centr
al S
ecto
r
Sta
te S
ecto
r
JV
Private
Secto
r
To
tal
Centr
al S
ecto
r
Sta
te S
ecto
r
JV
Private
Secto
r
To
tal
Centr
al S
ecto
r
Sta
te S
ecto
r
JV
Private
Secto
r
To
tal
Centr
al S
ecto
r
Sta
te S
ecto
r
JV
Private
Secto
r
To
tal
Centr
al S
ecto
r
Sta
te S
ecto
r
JV
Private
Secto
r
To
tal
Cen
tral S
ecto
r
Sta
te S
ecto
r
JV
Pri
vate
Secto
r
Gra
nd
To
tal
3000 0 0 3000 0 0 0 0 22200 0 0 22200 8185 13085 630 21900 740 14760 0 15500 34125 27845 630 62600
Oct18 Programme 0 0 0 0 0 0 0 0 0 0 0 0 1000 1260 630 2890 0 1400 0 1400 1000 2660 630 4290
Achievement 0 0 0 0 0 0 0 0 3000 0 0 3000 1500 3120 0 4620 0 2220 0 2220 4500 5340 0 9840
Upto Oct-18 Programme 0 0 0 0 0 0 0 0 10000 0 0 10000 6130 7435 630 14195 0 9670 0 9670 16130 17105 630 33865
Achievement 0 0 0 0 0 0 0 0 14000 0 0 14000 9000 7550 630 17180 0 10610 0 10610 23000 18160 630 41790
21(1)
220 kV Grand Total 800 kV 500 kV
Programme 2018-19
Programme
Achievement
HVDC765 kV 400 kV
File NoCEA-CH-14-1142018-Coordination Division
As on 31-10-18
Sl Voltage Ratio Capacity
No (kVkV) (MWMVA)
1 2 3 4 5
1 Cuddapah Ss 765400 PGCIL 3000
2 Tughlakabad SS (GIS) 400220 PGCIL 1500
Total of CENTRAL SECTOR 4500
3 Panki Kanpur (Aug) TF-I 400200 UPPTCL 75
4 Hindupur ss (1st ICT) 400220 APTRANSCO 315
5 Thappagundu ss 400110 TANTRANSCO 600
6 Mendhasal (2nd power TF) 400220 OPTCL 20
7 Jodhpur ss (New) 400220 RVPNL 315
8 Shankarpally 400220 TSTRANSCO 500
9 Podili ss (1st ICT) 400220 APTRANSCO 315
10 Doni (Gadag)SS 400220 KPTCL 1000
11 Porur (Addl TF) 230110 TANTRANSCO 100
12 Anuppankulam (Addl TF) 230110 TANTRANSCO 60
13 Neyveli SS 230110 TANTRANSCO 480
14 Savarkundla (Aug) 22066 GETCO 60
15 Bhuna (Aug) 220132 HVPNL 100
16 Madanpur (Aug) 22066 HVPNL 100
17 Gurgaon Sec-52A (Aug) 22066 HVPNL 160
18 IA Hisar (Aug) 220132 HVPNL 50
19 Narwana (Aug) 220132 HVPNL 60
20 Therubali (3rd Auto TF) 220132 OPTCL 160
21 Halasar ss 220132 RVPNL 160
22 Bansi Siddaharthnagar (Aug) TF-I 220132 UPPTCL 60
23 Hata Kushinagar (New) TF-I 220132 UPPTCL 100
24 Gomti nagar Lucknow (Aug) TF-IV 22033 UPPTCL 60
25 Kanpur Road Lucknow (New) TF-III 22033 UPPTCL 60
26 Asoj (Aug) 22066 GETCO 150
27 Kangasiyali (Aug) 22066 GETCO 60
28 Karmsad (Aug) 22066 GETCO 160
29 Lalpar (Aug) 22066 GETCO 60
TOTAL STATE SECTOR 5340
GRAND TOTAL 9840
21(2)
PRIVATE SECTOR
CENTRAL SECTOR
STATE SECTOR
2Sub-Stations (220 kV and above) CommissionedReady for commissioning During Oct-2018
Name of Sub StationsExecuting
Agency
File NoCEA-CH-14-1142018-Coordination Division
SN Contents Page
1 Electricity Generation (MU) Targets and Achievements for 2018-19 22
Section E - Electricity Generation
File NoCEA-CH-14-1142018-Coordination Division
Programme Achievement Ach Programme Achievement Ach
Central Sector 35160700 3028100 3162321 10443 20144400 21150469 10499
State Sector 35132000 3010000 3017260 10024 19922100 19549030 9813
PvtIPP Sector 36999700 3240600 3375603 10417 21598300 20794155 9628
PvtUTL Sector 1857600 164500 180597 10979 1130900 1203107 10638
Total 109150000 9443200 9735781 10310 62795700 62696761 9984
Central Sector 5617600 420900 451004 10715 4193000 4045436 9648
State Sector 6110600 559500 708469 12663 4049400 4433000 10947
PvtIPP Sector 1141800 80500 90122 11195 976400 1021963 10467
PvtUTL Sector 130000 11300 12564 11119 76700 99943 13030
Total 13000000 1072200 1262159 11772 9295500 9600342 10328
Central Sector 3850000 353300 303310 8585 2068900 2203540 10651
Total 3850000 353300 303310 8585 2068900 2203540 10651
Bhutan Import 500000 63300 35395 5592 347000 416660 12007
Central Sector 44628300 3802300 3916635 10301 26406300 27399445 10376
State Sector 41242600 3569500 3725729 10438 23971500 23982030 10004
Pvt Sector 40129100 3496900 3658886 10463 23782300 23119168 9721
Total 126500000 10932000 11336645 10370 74507100 74917303 10055
Provisional based on actual-cum-Assesment
Figs in MU
Cummulative
Achievement
Cummulative
Achievement
Sep-18 Sep-17 Upto Sep-2018 Upto Sep-2017
1073794 748889 7332680 5660929
22
Renewable Energy Generation
Achievement
Oct-2018
1 Electricity Generation (MU) Targets and Achievememts for 2018-19
All India Energy Generation During April 2018- Oct 2018 (MU)
Target (2018-19)April 2018- Oct 2018
Sector
Hydro
Thermal
Nuclear
627957
92955
20689
745071
626968
96003
22035
749173
0
100000
200000
300000
400000
500000
600000
700000
800000
Thermal Hydro Nuclear Total
Programme
Achievement
File NoCEA-CH-14-1142018-Coordination Division
SN Contents Page
1 Energy Power Supply Position (Provisional) for Oct-2018 and during April 2018- Oct 2018 23
2 Peak Power Supply Position (Provisional) for Oct-2018 and during April 2018- Oct 2018 24
3 Energy Power Supply Position (Revised) for Sep-2018 and during April 2018- Sept 2018 25
4 Peak Power Supply Position (Revised) for Sep-2018 and during April 2018- Sept 2018 26
5 Notified Power cuts Restrictions on Industries during Oct-2018 27
6 Power Supply to Agricultural Sector during Oct-2018 28
Section F - Power supply position
File NoCEA-CH-14-1142018-Coordination Division
आकड़ मममलयन यननट नट Figures in MU net
ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied
कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )
चडीगढ़ Chandigarh 108 108 0 00 1055 1055 0 00
दिलली Delhi 2490 2489 1 00 22524 22510 14 01
हरियजणज Haryana 4554 4554 0 00 35205 35205 0 00
दहमजचल परिश Himachal Pradesh 788 787 2 02 5728 5560 168 29
रमम कशमीि Jammu amp Kashmir 1497 1219 278 186 10982 8865 2117 193
परजब Punjab 4418 4418 0 00 38832 38819 13 00
िजरसथजन Rajasthan 6748 6748 0 00 45341 45181 160 04
उतति परिश Uttar Pradesh 10136 9973 164 16 75485 74808 676 09
उततिजखड Uttarakhand 1083 1081 3 03 8395 8310 85 10
उततरी कषतर Northern Region 31822 31375 447 14 243547 240314 3233 13
छततीसगढ़ Chhattisgarh 2454 2453 1 00 16119 16091 28 02
गरिजत Gujarat 11636 11636 0 00 70782 70768 14 00
मधय परिश Madhya Pradesh 5860 5859 1 00 38412 38410 2 00
महजिजषटर Maharashtra 15223 15095 128 08 95489 95355 134 01
िमन औि दिउ Daman amp Diu 216 216 0 00 1523 1523 0 00
िजिि व नगि हवली Dadra amp Nagar Haveli 553 553 0 00 3757 3757 0 00
गोवज Goa 366 366 0 00 2497 2495 2 01
पशचिमी कषतर Western Region 36308 36178 130 04 228579 228398 180 01
आनधर परिश Andhra Pradesh 5860 5854 6 01 37377 37334 43 01
तलगजनज Telangana 6748 6742 6 01 38251 38205 46 01
कनजाटक Karnataka 5842 5835 7 01 39111 39059 52 01
किल Kerala 2116 2096 20 09 14256 14160 96 07
तममल नजड Tamil Nadu 8611 8601 10 01 65742 65666 76 01
पडचिी Puducherry 216 215 1 05 1654 1646 8 05
लकष-दवीप Lakshadweep 4 4 0 0 27 27 0 0
दकषकषणी कषतर Southern Region 29392 29342 50 02 196390 196069 321 02
बबहजि Bihar 2742 2738 4 01 19143 18951 192 10
िजमोिि घजटी ननगम DVC 1712 1698 13 08 13096 12828 268 20
झजिखणड Jharkhand 701 697 4 06 5022 4949 73 15
ओडडशज Odisha 3147 3134 13 04 20224 20192 32 02
पशशचम बगजल West Bengal 4204 4200 4 01 33008 32881 127 04
मसशककम Sikkim 40 40 0 00 279 279 0 01
अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 67 202 188 13 67
परवी कषतर Eastern Region 12547 12507 40 03 90772 90080 692 08
अरणजचल परिश Arunachal Pradesh 67 66 1 09 502 496 7 13
असम Assam 833 809 24 29 6153 5903 250 41
मणणपि Manipur 72 71 1 10 485 478 7 14
मघजलय Meghalaya 147 147 0 00 1043 1042 0 00
ममज़ोिम Mizoram 63 62 1 08 365 359 5 14
नजगजलड Nagaland 76 67 8 110 540 481 59 109
बिपिज Tripura 130 129 1 09 1025 1007 19 18
उततर-परवी कषतर North-Eastern Region 1387 1351 35 25 10113 9766 346 34
समपणण भारत All India 111455 110753 702 06 769399 764627 4773 06
23
ऊराण वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Energy Power Supply Position Report (Provisional)
राजयStateअकरबर2018 October2018 अपरल2018 -अकरबर2018 April2018 to October2018
ऊरजा पनत ा म कमी ऊरजा पनत ा म कमीEnergy not Supplied
Excludes energy exported to Bangladesh
Energy not Supplied
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
File NoCEA-CH-14-1142018-Coordination Division
अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met
कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )
चडीगढ़ Chandigarh 217 217 0 00 369 369 0 00
दिलली Delhi 4713 4713 0 00 7016 7016 0 00
हरियजणज Haryana 7948 7948 0 00 10270 10270 0 00
दहमजचल परिश Himachal Pradesh 1520 1520 0 00 1520 1520 0 00
रमम कशमीि Jammu amp Kashmir 2836 2269 567 200 2951 2361 590 200
परजब Punjab 7979 7979 0 00 12638 12638 0 00
िजरसथजन Rajasthan 11450 11450 0 00 11698 11698 0 00
उतति परिश Uttar Pradesh 17434 16745 688 39 20498 20062 436 21
उततिजखड Uttarakhand 1943 1943 0 00 2143 2143 0 00
उततरी कषतर Northern Region 50659 49635 1024 20 63166 61726 1440 23
छततीसगढ़ Chhattisgarh 4414 4268 146 33 4414 4268 146 33
गरिजत Gujarat 18148 18130 19 01 18148 18130 19 01
मधय परिश Madhya Pradesh 11356 11317 39 03 11356 11317 39 03
महजिजषटर Maharashtra 23864 23159 705 30 23864 23254 610 26
िमन औि दिउ Daman amp Diu 342 341 1 02 357 356 1 02
िजिि व नगि हवली Dadra amp Nagar Haveli 784 780 4 05 816 815 1 01
गोवज Goa 536 536 0 00 596 596 0 00
पशचिमी कषतर Western Region 56548 55695 853 15 56548 55695 853 15
आनधर परिश Andhra Pradesh 9435 9435 0 00 9435 9435 0 00
तलगजनज Telangana 10603 10603 0 00 10815 10815 0 00
कनजाटक Karnataka 10741 10741 0 00 10741 10741 0 00
किल Kerala 3727 3644 83 22 4050 3997 53 13
तममल नजड Tamil Nadu 14747 14333 414 28 15029 14981 47 03
पडचिी Puducherry 363 362 1 03 420 400 19 46
लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0
दकषकषणी कषतर Southern Region 45279 45226 53 01 45946 45684 262 06
बबहजि Bihar 4945 4945 0 00 5050 5045 5 01
िजमोिि घजटी ननगम DVC 2729 2729 0 00 2874 2874 0 00
झजिखणड Jharkhand 1260 1260 0 00 1339 1284 55 41
ओडडशज Odisha 5624 5224 400 71 5624 5357 268 48
पशशचम बगजल West Bengal 8775 8775 0 00 9130 9123 7 01
मसशककम Sikkim 86 86 0 00 90 90 0 00
अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7
परवी कषतर Eastern Region 22959 22567 392 17 22959 22567 392 17
अरणजचल परिश Arunachal Pradesh 138 125 13 94 138 133 5 37
असम Assam 1785 1704 81 45 1865 1809 56 30
मणणपि Manipur 187 185 2 11 193 186 7 36
मघजलय Meghalaya 336 336 0 00 371 368 2 07
ममज़ोिम Mizoram 99 97 2 20 103 98 4 41
नजगजलड Nagaland 134 131 3 22 156 138 18 117
बिपिज Tripura 269 269 0 00 298 293 5 17
उततर-परवी कषतर North-Eastern Region 2790 2700 90 32 2967 2850 117 39
समपणण भारत All India 172945 170604 2341 14 177022 175528 1494 08
24
अधिकतम वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Peak Power Supply Position Report (Provisional)
आकड़ मगज वजट नट Figures in MW netअपरल2018 -अकरबर2018 April2018 to October2018
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
मजग की पनता म कमी Demand not Met
Excludes the supply to Bangladesh
राजयStateअकरबर2018 October2018
मजग की पनता म कमी Demand not Met
File NoCEA-CH-14-1142018-Coordination Division
आकड़ मममलयन यननट नट Figures in MU net
ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied
कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )
चडीगढ़ Chandigarh 141 141 0 00 947 947 0 00
दिलली Delhi 2925 2924 1 00 20034 20021 13 01
हरियजणज Haryana 4794 4794 0 00 30651 30651 0 00
दहमजचल परिश Himachal Pradesh 876 853 24 27 4940 4773 167 34
रमम कशमीि Jammu amp Kashmir 1520 1246 274 180 9485 7646 1839 194
परजब Punjab 5575 5575 0 00 34414 34401 13 00
िजरसथजन Rajasthan 6202 6201 0 00 38594 38434 160 04
उतति परिश Uttar Pradesh 10211 10124 86 08 65349 64836 513 08
उततिजखड Uttarakhand 1162 1149 13 11 7311 7229 82 11
उततरी कषतर Northern Region 33405 33008 398 12 211725 208939 2786 13
छततीसगढ़ Chhattisgarh 2403 2388 15 06 13665 13638 27 02
गरिजत Gujarat 10122 10122 0 00 59146 59132 14 00
मधय परिश Madhya Pradesh 5492 5491 1 00 32552 32551 1 00
महजिजषटर Maharashtra 13615 13612 3 00 80266 80260 6 00
िमन औि दिउ Daman amp Diu 221 221 0 00 1306 1306 0 00
िजिि व नगि हवली Dadra amp Nagar Haveli 551 551 0 00 3204 3204 0 00
गोवज Goa 339 339 0 00 2131 2128 2 01
पशचिमी कषतर Western Region 32742 32723 19 01 192270 192220 50 00
आनधर परिश Andhra Pradesh 5294 5287 7 01 31518 31480 37 01
तलगजनज Telangana 6279 6272 8 01 31503 31463 40 01
कनजाटक Karnataka 5701 5693 8 01 33269 33225 45 01
किल Kerala 2050 2026 24 12 12140 12063 76 06
तममल नजड Tamil Nadu 8971 8959 12 01 57131 57065 66 01
पडचिी Puducherry 226 224 2 08 1438 1431 7 05
लकष-दवीप Lakshadweep 4 4 0 0 23 23 0 0
दकषकषणी कषतर Southern Region 28520 28460 60 02 166998 166727 271 02
बबहजि Bihar 2839 2793 46 16 16400 16213 188 11
िजमोिि घजटी ननगम DVC 1901 1750 151 79 11384 11130 254 22
झजिखणड Jharkhand 740 723 17 22 4321 4252 69 16
ओडडशज Odisha 2921 2918 3 01 17077 17058 19 01
पशशचम बगजल West Bengal 4902 4879 23 05 28804 28681 123 04
मसशककम Sikkim 39 39 0 01 239 239 0 01
अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 67 173 162 12 67
परवी कषतर Eastern Region 13341 13102 240 18 78225 77573 652 08
अरणजचल परिश Arunachal Pradesh 74 73 1 10 435 429 6 14
असम Assam 950 914 36 38 5320 5094 226 43
मणणपि Manipur 70 69 1 11 414 408 6 15
मघजलय Meghalaya 150 150 0 01 896 896 0 01
ममज़ोिम Mizoram 58 57 1 12 302 297 5 16
नजगजलड Nagaland 80 72 8 104 464 414 50 108
बिपिज Tripura 192 191 1 07 895 878 17 19
उततर-परवी कषतर North-Eastern Region 1575 1527 48 31 8726 8415 311 36
समपणण भारत All India 109584 108819 765 07 657944 653873 4071 06
Energy not Supplied Energy not Supplied
ससतबर2018 September2018 अपरल2018 -ससतबर2018 April2018 to September2018
ऊरजा पनत ा म कमी ऊरजा पनत ा म कमी
Excludes energy exported to Bangladesh
राजयState
ऊराण वरवदयत आपरतण शथिरत ररपोरण (सशोधित) Energy Power Supply Position Report (Revised)
25
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
File NoCEA-CH-14-1142018-Coordination Division
अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met
कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )
चडीगढ़ Chandigarh 293 293 0 00 369 369 0 00
दिलली Delhi 5358 5358 0 00 7016 7016 0 00
हरियजणज Haryana 9008 9008 0 00 10270 10270 0 00
दहमजचल परिश Himachal Pradesh 1466 1466 0 00 1479 1479 0 00
रमम कशमीि Jammu amp Kashmir 2951 2361 590 200 2951 2361 590 200
परजब Punjab 11405 11405 0 00 12638 12638 0 00
िजरसथजन Rajasthan 10612 10612 0 00 11698 11698 0 00
उतति परिश Uttar Pradesh 18346 18121 225 12 20498 20062 436 21
उततिजखड Uttarakhand 1996 1996 0 00 2143 2143 0 00
उततरी कषतर Northern Region 56407 55649 758 13 63166 61726 1440 23
छततीसगढ़ Chhattisgarh 4404 4075 328 75 4404 4136 268 61
गरिजत Gujarat 16963 16963 0 00 17053 16963 90 05
मधय परिश Madhya Pradesh 8811 8771 41 05 8811 8775 36 04
महजिजषटर Maharashtra 22455 22349 106 05 23395 23254 141 06
िमन औि दिउ Daman amp Diu 357 356 1 02 357 356 1 02
िजिि व नगि हवली Dadra amp Nagar Haveli 816 815 1 01 816 815 1 01
गोवज Goa 596 596 0 00 596 596 0 00
पशचिमी कषतर Western Region 52933 52895 38 01 53841 52895 945 18
आनधर परिश Andhra Pradesh 9435 9416 19 02 9435 9416 19 02
तलगजनज Telangana 10815 10815 0 00 10815 10815 0 00
कनजाटक Karnataka 10103 10090 13 01 10690 10688 2 00
किल Kerala 3888 3638 251 64 4050 3997 53 13
तममल नजड Tamil Nadu 14556 14553 3 00 15029 14981 47 03
पडचिी Puducherry 390 372 17 45 420 400 19 46
लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0
दकषकषणी कषतर Southern Region 45542 45428 114 02 45946 45684 262 06
बबहजि Bihar 5050 5045 5 01 5050 5045 5 01
िजमोिि घजटी ननगम DVC 2641 2641 0 00 2874 2874 0 00
झजिखणड Jharkhand 1233 1233 0 00 1339 1284 55 41
ओडडशज Odisha 4906 4906 0 00 5357 5357 0 00
पशशचम बगजल West Bengal 8644 8639 5 01 9130 9123 7 01
मसशककम Sikkim 78 78 0 00 90 90 0 00
अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7
परवी कषतर Eastern Region 22110 22100 10 00 22470 22290 180 08
अरणजचल परिश Arunachal Pradesh 132 130 2 15 138 133 5 37
असम Assam 1865 1809 56 30 1865 1809 56 30
मणणपि Manipur 184 182 2 13 193 186 7 36
मघजलय Meghalaya 317 317 0 00 371 368 2 07
ममज़ोिम Mizoram 95 93 2 23 103 98 4 41
नजगजलड Nagaland 142 138 5 32 156 138 18 117
बिपिज Tripura 296 293 3 10 298 293 5 17
उततर-परवी कषतर North-Eastern Region 2921 2850 71 24 2967 2850 117 39
समपणण भारत All India 177022 175528 1494 08 177022 175528 1494 08
26
मजग की पनता म कमी मजग की पनता म कमी Demand not MetDemand not Met
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
Excludes the supply to Bangladesh
अधिकतम वरवदयत आपरतण शथिरत ररपोरण (सशोधित) Peak Power Supply Position Report (Revised)
आकड़ मगज वजट नट Figures in MW net
राजयStateससतबर2018 September2018 अपरल2018 -ससतबर2018 April2018 to September2018
File NoCEA-CH-14-1142018-Coordination Division
अकरबर2018 October2018अपरल2018 -अकरबर2018 April2018 to October2018
उततरी कषतर Northern Region
चडीगढ़ Chandigarh Data not received Data not received
दिलली Delhi
हरियजणज Haryana
दहमजचल परिश Himachal Pradesh
रमम कशमीि Jammu amp Kashmir Data not received Data not received
परजब Punjab
िजरसथजन Rajasthanउतति परिश Uttar Pradesh
उततिजखड Uttarakhand
पशचिमी कषतर Western Region
छततीसगढ़ Chhattisgarh
गरिजत Gujarat
मधय परिश Madhya Pradesh
महजिजषटर Maharashtra
गोवज Goa
दकषकषणी कषतर Southern Region
आनधर परिश Andhra Pradesh
तलगजनज Telangana
कनजाटक Karnataka
किल Kerala
तममल नजड Tamil Nadu
पडचिी Puducherryपरवी कषतर Eastern Region
बबहजि Bihar
झजिखणड Jharkhand
ओडडशज Odisha
पशशचम बगजल West Bengal
N
o No
tified
Cuts
N
o No
tified
Cuts
27
अकरबर 2018 म इडथरीर पर वरवदयत करौती का वरवरवरण Notified Power CutsRestrictions on Industries during October2018
राजय कषतर State Regionऊराणमाग करौती EnergyDemand Cut
No Notified Cuts No Notified Cuts
File NoCEA-CH-14-1142018-Coordination Division
अकरबर2018 October2018अपरल2018 -अकरबर2018 April2018 to October2018
उततरी कषतर Northern Region
चडीगढ़ Chandigarh Data not received Data not received
दिलली Delhi Data not received Data not received
हरियजणज Haryana 940 hrsday 0709 - 0950 hrsday
दहमजचल परिश Himachal Pradesh No cut imposed on agriculture consumers and uninterrupted
power is being supplied to agriculture sector
HPSEBL has only 2 agriculture consumers and uninterrupted
power is being supplied to agriculture sector
रमम कशमीि Jammu amp Kashmir Data not received Data not received
परजब Punjab 0507 hrsday 0349 - 0844 hrsday
िजरसथजन Rajasthan 0630 hrsday 0630 hrsday
उतति परिश Uttar Pradesh 1825 hrsday 1814 - 1858 hrsday
उततिजखड Uttarakhand 2350 hrsday 2128 - 2357 hrsday
पशचिमी कषतर Western Region
छततीसगढ़ Chhattisgarh 18hoursday 18 hrsday
गरिजत Gujarat 805 hrsday 805 hrsday
मधय परिश Madhya Pradesh Three-Phase Supply(Irrigation)-947 hrs day
Three-Phase (Mixed) Supply - 2311 hrs day
Three-Phase Supply(Irrigation)- 0933 - 0947 hrs day Three-
Phase (Mixed) Supply - 2300 - 2320 hrs day
महजिजषटर Maharashtra Three-Phase Supply(Irrigation)- 9 hrs day
Three-Phase (Mixed) Supply - 24 hrs day
Three-Phase Supply(Irrigation)- 9 hrs day
Three-Phase (Mixed) Supply - 24 hrs day
गोवज Goa No restriction No restriction
दकषकषणी कषतर Southern Region
आनधर परिश Andhra Pradesh 07 hrsday 07 hrsday
तलगजनज Telangana 24 hoursday 24 hoursday
कनजाटक Karnataka 6 hrsday 6 hrsday
किल Kerala No Restrictions No Restrictions
तममल नजड Tamil Nadu 9 hrsday (6 hrs during day time and 3 hrs during night time) 9 hrsday (6 hrs during day time and 3 hrs during night time)
पडचिी Puducherry No Restrictions No Restrictions
परवी कषतर Eastern Region
बबहजि Bihar About 18 hrsday About 18 hrsday
झजिखणड Jharkhand About 20 hrsday About 20 hrsday
ओडडशज Odisha 24 hrsday 24 hrsday
पशशचम बगजल West Bengal About 23 hrsday About 23 hrsday
28
अकटबर 2018 कषि कषतर को षिदयत आपरति का षििरण Power Supply to Agricultural Sector during October2018
राजय कषतर State Regionऔसत वरवदयत आपरतण घनरो म Average Hours of Supply
On segregated feeders
File NoCEA-CH-14-1142018-Coordination Division
SNo Contents Page
1 Growth of Installed Capacity since 6th Plan 29
2 Progress of Transmission Sector since 6th Plan 30
3 All India Yearly Coal consumption for Power Generation (Utilities)
4 All India Annual Per Capita Consumption of Electricity since -2006
5 Average cost of power supply amp Average realisation (Paisakwh)
6 Growth of Rural Electrification amp Pump Sets Energisation
7 Status of Hydro Schemes Cleared by the CEA in Oct-2018
Section G - Growth of Power Sector
31
32
File NoCEA-CH-14-1142018-Coordination Division
(In MW)
Coal Gas Diesel Total
End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472
End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634
End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537
End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596
End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921
End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703
End of 12th Plan 19216288 2532938 83763 21832988 6780 4447842 50018 31960630
Up to Oct-2018 19599250 2493722 837629 22176734 6780 4548742 7201281 34604757
Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-17) = 51529 MW
Electricity Generation (MU) Targets and Achievements for 2016-17
Coal Gas Diesel Nuclear Hydro Res Total
1959925 2493722 837629 678000 454874 72012805 22925174
29
1 Growth of Installed Capacity Since 6th Plan
Plan YearThermal
Nuclear Hydro RES (MNRE) Total
Total Installed Capacity 34604757 MW
Coal Gas Diesel Nuclear Hydro Res
File NoCEA-CH-14-1142018-Coordination Division
Progress of Transmission Sector in the Country up to Oct 2018
1 TRANSMISSION LINES (All fig in CKM)
At the end of
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
6th plan 0 0 0 0 0 0 0 0 0 0 0 0 1831 4198 0 6029 1641 44364 0 46005 3472 48562 0 52034
7th plan 0 0 0 0 0 0 0 0 0 0 0 0 13068 6756 0 19824 4560 55071 0 59631 17628 61827 0 79455
8th plan 0 0 0 0 1634 0 0 1634 0 0 0 0 23001 13141 0 36142 6564 73036 0 79600 31199 86177 0 117376
9th plan 0 0 0 0 3234 1504 0 4738 751 409 0 1160 29345 20033 0 49378 8687 88306 0 96993 42017 110252 0 152269
10th plan 0 0 0 0 4368 1504 0 5872 1775 409 0 2184 48708 24730 0 73438 9444 105185 0 114629 64295 131828 0 196123
11th Plan 0 0 0 0 5948 1504 1980 9432 4839 411 0 5250 71023 30191 5605 106819 10140 125010 830 135980 91950 157116 8415 257481
12th Plan 6124 0 0 6124 5948 1504 1980 9432 25465 1177 4598 31240 92482 48240 17065 157787 11014 151276 978 163268 141033 202197 24621 367851
13th Plan (Up
to Mar2018)6124 0 0 6124 5948 1504 1980 9432 28666 1512 4881 35059 98247 54286 19067 171600 11258 156497 1000 168755 150243 213799 26928 390970
13th Plan (Up
to Sep-18)6124 0 0 6124 5948 1504 1980 9432 30952 1512 5059 37523 99683 56069 20662 176414 11318 160958 1000 173276 154025 220043 28701 402769
27150
75050
47900
118050
90650
30
IR addition in 12th Plan (up to
March 2017)
Total IR (up to Oct-18)
IR at the end of 11th Plan
IR at the end of 12th Plan
Envisaged IR Capacity at the end
of 13th Plan
Grand Total
Note - The figure upto the end of 10th plan in for stringing progress including the lines not commissioned Now only commissioned lines are reckoned Accordingly the figure for 10th plan (end) may read as 187555 after adjusting with (-) 10852 Ckm
Inter-regional Power Transfer Capacity
plusmn 800 kV HVDC plusmn 500 kV HVDC 765 kV 400 kV 220 kV
File NoCEA-CH-14-1142018-Coordination Division
2004-05 27800
2005-06 28100
2006-07 30200
2007-08 33000
2008-09 35500
2009-10 36700
2010-11 38700
2011-12 41756
2012-13 45460
2013-14 48940
2014-15 53040
2015-16 54590
2016-17 57430
2017-18 60800
Year
2005-06
2006-07
2007-08
2008-09
2009-10
2010-11
2011-12
2012-13
2013-14
2014-15
2015-16
2016-17
2017-18
2004-05 254 209 7568
2005-06 260 221 7636
2006-07 276 227 7423
2007-08 293 239 7727
2008-09 340 263 8713
2009-10 355 268 8870
2010-11 398 303 11975
2011-12 455 330 13514
2012-13 501 376 14867
2013-14 518 175
2014-15 520
6719
7171
3 All India yearly Coal Consumption for Power Generation (Utilities)
YEARCoal Consumption
Million Tonnes
4 All India Annual per Capita consumption of Electricity Since 2006
Per Capita Consumption ( kWh)
6314
(GrossGen+ Net Import) Mid-year population
5 Average cost of power supply amp average realization ( paiseKWH )
Yearcost of supply
(paiseunit)
Realization(paiseunit)
Including AgricultureOnly
Agriculture
1149
7335
7786
91441
8188
88363
957
1010
1075
1122
File NoCEA-CH-14-1142018-Coordination Division
Source- PFC Reports on the performance of State Power Utilities 31
File NoCEA-CH-14-1142018-Coordination Division
Sl
NoExecuting Agency
Installed
Capacity (MW)Cost (Rs crore)
Date of
Clearance
32
No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification
since 2004-05
65291374575 296361511th Plan
Cumu upto End of 11th Plan
596556 21212860
557439Cummulative up to end of 12th Plan
46708
18423975
499150
2003-042004-05
5743
9769
Cumu upto End of 10th Plan
010407 to 310308
010410 to 310311557976840909
010411 to 310312
412667
86293726
3207
482864
12632
1576036
4451722594
15455554
2314176
397343611750
2093311060316074
65109527813884
6 Growth Of Rural Electrification amp Pumpsets Energisation
Plan Year
9th Plan2002-03
134092626
4111
Pump Sets Energised Villages Electricfied (Nos)
2001-02
284064367244
1218
27801997-981998-991999-002000-01
297594
010408 to 310309010409 to 310310
10th Plan
2005-062006-07
322968331020
Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as
Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received
from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made
available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified
villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is
independent of the earlier published reports
No Hydro Electric Project has been issued concurrenceAppraisal letter by CEA during October 2018
7 Status of Hydro Schemes Cleared by the CEA in Oct-2018
Name of Scheme
File NoCEA-CH-14-1142018-Coordination Division
SN Contents Page
1 Rate of sale of power for the year 2016-17 33-41
RATE OF SALE OF POWER FOR THE YEAR 2016-17
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) NORTHERN REGION
CENTRAL SECTOR
BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 18000 66900 19800
CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 54000 222400 21600
CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 30000 144400 19600
CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 23100 91700 42600
PARBATI - III HPS NHPC LTD HYDRO-HYDRO 52000 68200 54800
DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 28000 95600 30000
CHUTAK NHPC LTD HYDRO-HYDRO 4400 22000 79800
DULHASTI HPS NHPC LTD HYDRO-HYDRO 39000 228000 56400
SALAL HPS NHPC LTD HYDRO-HYDRO 69000 342300 11000
TANAKPUR HPS NHPC LTD HYDRO-HYDRO 9420 43000 29600
URI HPS -I NHPC LTD HYDRO-HYDRO 48000 280300 16000
URI HPS - II NHPC LTD HYDRO-HYDRO 24000 147300 48600
NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 4500 24600 88200
SEWA - II NHPC LTD HYDRO-HYDRO 12000 47100 43400
ANTA CCPP NTPC LTD THERMAL-GASN 41930 67539 32400
AURAIYA CCPP NTPC LTD THERMAL-GASN 66336 53501 39100
BADARPUR TPS NTPC LTD THERMAL-COAL 70500 159153 44800
DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 84000 296170 42300
DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 98000 526686 46300
DADRI CCPP NTPC LTD THERMAL-GASHSD 82978 227469 33000
FARIDABAD CCPP NTPC LTD THERMAL-GASN 43159 115577 30800
RIHAND STPS I NTPC LTD THERMAL-COAL 100000 596766 24500
RIHAND STPS II NTPC LTD THERMAL-COAL 100000 737069 24600
RIHAND STPS III NTPC LTD THERMAL-COAL 100000 706546 30600
SINGRAULI STPS NTPC LTD THERMAL-COAL 200000 1394068 20400
TANDA TPS NTPC LTD THERMAL-COAL 44000 295438 40800
UNCHAHAR TPS I NTPC LTD THERMAL-COAL 42000 256454 39800
UNCHAHAR TPS II NTPC LTD THERMAL-COAL 42000 273577 38900
UNCHAHAR TPS III NTPC LTD THERMAL-COAL 21000 142780 43000
KOLDAM NTPC LTD HYDRO-HYDRO 80000 363260 43600
NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 303575 25841
RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 108000 668677 35374
NJHPS SJVNL HYDRO-HYDRO 150000 699496 23820
RAMPUR HPS SJVNL HYDRO-HYDRO 41202 195982 32260
TEHRI HPP THDC HYDRO-HYDRO 100000 272543 51800
KOTESHWAR HEP THDC HYDRO-HYDRO 40000 106244 53400
IGSTPS JHAJJAR ARAVALI P CPL THERMAL-COAL 150000 510429 49490
NEYVELI BARSINGSAR NEYVELI LIG CORP LTD THERMAL-LIG 25000 127520 38040
STATE SECTOR
PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 21000 14222 48200
PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 21000 19205 48400
PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 25000 102257 42600
PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 25000 62107 41800
DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 60000 312213 41000
RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 120000 35767442200
WYC HYDEL STATION HPGCL HYDRO-HYDRO 6240 20365 24900
GIRI POWER HOUSE HPSEB HYDRO-HYDRO 6000 13958 7600
ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 1695 5467 11900
BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 12000 18528 6700
GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 2250 7462 22500
BASSI POWER HOUSE HPSEB HYDRO-HYDRO 6600 29649 7500
BINWA POWER HOUSE HPSEB HYDRO-HYDRO 600 2749 19300
ANNEXURE-I
RATE OF SALE OF POWER FOR THE YEAR 2016-2017
Page 33
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) GAJ POWER HOUSE HPSEB HYDRO-HYDRO 1050 2914 26700
BANER POWER HOUSE HPSEB HYDRO-HYDRO 1200 2864 16200
HOLI POWER HOUSE HPSEB HYDRO-HYDRO 300 616 22500
THIROT POWER HOUSE HPSEB HYDRO-HYDRO 450 1126 22500
KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 1200 3064 22500
LARJI POWER HOUSE HPSEB HYDRO-HYDRO 12600 53677 23700
NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 250 750 31000
CHABA POWER HOUSE HPSEB HYDRO-HYDRO 175 465 23300
RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 150 101 13400
SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 200 000 22500
KILLAR HPSEB HYDRO-HYDRO 030 050 22500
BHABA AUGUMENP H HPSEB HYDRO-HYDRO 450 1276 22500
BS CHAMBA HPSEB HYDRO-HYDRO 045 099 19500
GUMMA HPSEB HYDRO-HYDRO 300 423 22500
GAS TURBINE POWER STATION IPGCL THERMAL-GAS 27000 67233 39300
PPS-I PPCL THERMAL-GAS 33000 175905 38300
PPS-III PPCL THERMAL-GAS 137120 196879 36100
LOWER JHELUM JampKPDD HYDRO-HYDRO 10500 60214 5100
UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 2260 10514 6300
UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 10500 44202 8500
GANDHARBAL JampKPDD HYDRO-HYDRO 1500 8925 4700
KARNAH MPH JampKPDD HYDRO-HYDRO 200 1122 31000
CHENANI I JampKPDD HYDRO-HYDRO 2330 10892 6600
CHENANI II JampKPDD HYDRO-HYDRO 200 1188 9300
CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 750 3634 14200
IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 375 2108 18500
IGO MERCHELLONG JampKPDD HYDRO-HYDRO 300 1572 29700
PAHALGAM MHP JampKPDD HYDRO-HYDRO 450 1713 32900
MARPACHOO JampKPDD HYDRO-HYDRO 075 375 29800
HAFTAL JampKPDD HYDRO-HYDRO 100 483 28700
SANJAK JampKPDD HYDRO-HYDRO 126 441 36000
SEWA-III JampKPDD HYDRO-HYDRO 900 3273 20200
BHADERWAH JampKPDD HYDRO-HYDRO 150 935 8900
BAZGO JampKPDD HYDRO-HYDRO 030 108 33300
SUMOOR JampKPDD HYDRO-HYDRO 010 045 35400
HUNDER JampKPDD HYDRO-HYDRO 040 176 26200
STAKNA JampKPDD HYDRO-HYDRO 400 1933 4100
KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 124000 662879 31360
SURATGARH TPS RRVUNL THERMAL-COAL 150000 402328 41730
CHHABRA TPS 1amp 2 RRVUNL THERMAL-COAL 50000 305946 36700
CHHABRA TPS 3 RRVUNL THERMAL-COAL 25000 151536 36700
CHHABRA TPS 4 RRVUNL THERMAL-COAL 25000 155896 36700
RAMGARH GT POWER PROJECT RRVUNL THERMAL-COAL 22050 43177 41800
RAMGARH GAS T P PROJECT 3 RRVUNL THERMAL-GAS 5000 93615 41800
DHOLPUR C C POWER PROJECT RRVUNL THERMAL-R-LNG 33000 9486 46110
MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 14000 20855 34192
MINI MICRO HYDEL (MMH) P S RRVUNL HYDRO-HYDRO 2385 851 37800
KALISINDH TPP 1 RRVUNL THERMAL-COAL 60000 341543 45000
KALISINDH TPP 2 RRVUNL THERMAL-COAL 60000 211588 45000
KHARA HEP UPJVNL HYDRO-HYDRO 7200 26654 7200
MATATILLA HEP UPJVNL HYDRO-HYDRO 3060 12219 6500
OBRA HEP UPJVNL HYDRO-HYDRO 9900 21517 6300
RIHAND UPJVNL HYDRO-HYDRO 30000 57369 5500
ANPARA A TPS UPRVUNL THERMAL-COAL 63000 317536 27000
ANPARA B TPS UPRVUNL THERMAL-COAL 100000 705605 22700
ANPARA D UPRVUNL THERMAL-COAL 100000 300158 39800
HARDUAGANJ TPS UPRVUNL THERMAL-COAL 16500 45817 49200
HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 50000 304389 46600
OBRA A TPS UPRVUNL THERMAL-COAL 28800 13158 34000
OBRA B TPS UPRVUNL THERMAL-COAL 100000 328124 21900
Page 34
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) PANKI TPS UPRVUNL THERMAL-COAL 21000 66488 50300
PARICHHA TPS UPRVUNL THERMAL-COAL 22000 38762 49400
PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 42000 231931 45600
PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 50000 276722 50400
CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 24000 70845 8290
CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 14400 75366 8390
DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 3375 9595 12080
DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 5100 18701 10520
KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4140 17359 12330
KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 12000 33001 9420
KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 3000 11953 8320
TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 9000 33983 12460
MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 30400 124510 16110
RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 19800 17897 10550
MPUR UTTARAKHAND JVNL HYDRO-HYDRO 930 5121 19200
PATHRI UTTARAKHAND JVNL HYDRO-HYDRO 2040 11636 14200
GALOGI UTTARAKHAND JVNL HYDRO-HYDRO 300 648 12500
PRIVATE SECTOR
MGTPP CLP INDIA PVT LTD THERMAL-COAL 132000 268902 41940
SHRINAGAR HEP ALAKNANDA HPCL HYDRO-HYDRO 33000 127414 48800
GAMA INFRAPROP CCPP GAMA INFRAPROP PVT THERMAL-GAS 22500 52686 47000
PPGCL (BARA) JP POWER VENTURES LTD THERMAL-COAL 198000 448200 38500
MALANA HEP MALANA PCL HYDRO-HYDRO 8600 26354 29792
MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 10000 30369 32580
ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 19200 56347 36079
KASHANG HEP H P PCL HYDRO-HYDRO 19500 5034 29200
BASPA-II HEP HBPCL HYDRO-HYDRO 30000 132769 13600
KARCHAM WANGTOO HEP HBPCL HYDRO-HYDRO 100000 434386 36600
RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 108000 582600 43700
RITHALA COMBI CY POWER PLANT TATA POWER DDL THERMAL-GAS 9480 000 11900
RAJPURA TPS NABHA POWER LTD THERMAL-GAS 140000 901484 39000
TALWANDI SABO POWER LTD TALWANDI SABO POWER LTD THERMAL-COAL 198000 636040 49548
ROJA THERMAL POWER STATION ROJA POWER SCL THERMAL-COAL 120000 727200 43400
KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 34400 63400
BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 36000 62600
MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 38200 60800
UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 37900 61500
KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 42300 58800
LALITPUR PGCL BAJAJ ENERGY PVT LTD THERMAL-COAL 198000 359400 47300
PRAYAGRAJ PGCL PRAYAGRAJ PGCL THERMAL-COAL 132000 448200 38595
KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 132000 783182 33438
WESTERN REGION
CENTRAL SECTOR
INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 100000 325333 23892
OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 52000 141663 34001
GANDHAR CCPP NTPC LTD THERMAL-GAS 65739 221924 28700
KAWAS CCPP NTPC LTD THERMAL-GASN 65620 167929 27000
KORBA I amp II NTPC LTD THERMAL-COAL 210000 1499171 20500
KORBA III NTPC LTD THERMAL-COAL 50000 358746 26600
SIPAT STPS I NTPC LTD THERMAL-COAL 198000 1479902 26800
SIPAT STPS II NTPC LTD THERMAL-COAL 100000 766549 26500
VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 126000 693142 25800
VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 100000 608781 23800
VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 100000 673475 27600
VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 100000 655924 32900
VINDHYACHAL STPS V NTPC LTD THERMAL-COAL 50000 328265 31700
MOUDA I NTPC LTD THERMAL-COAL 100000 343130 44500
MOUDA Ii NTPC LTD THERMAL-COAL 66000 40637 39900
RATNAGIRI GAS amp POWER PVT LTD RGPPL THERMAL-GAS 196708 442485 47000
KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 000 24729
TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 32000 201227 10740
Page 35
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 365122 19069
TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 787444 29324
STATE SECTOR
GSEG-HAZIRA15610 MW GUJARAT S ENEGEN LTD THERMAL-GAS 15610 1805 28200
GSEG-HAZIRA35143 MW GUJARAT S ENEGEN LTD THERMAL-GAS 35130 22276 51300
GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 21978 51800
AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 13929 26100
KORBA TPS EAST CSPGCL THERMAL-COAL 44000 198673 33880
DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 365808 27570
KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 316500 30420
HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 532878 19410
CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 515 58300
MTTPS CHAMPA U-I CSPGCL THERMAL-COAL 50000 220376 39000
MTTPS CHAMPA U-II CSPGCL THERMAL-COAL 50000 23709 10000
SHP GANGREL CSPGCL HYDRO-HYDRO 1000 2350 36790
BANGO HEP CSPGCL HYDRO-HYDRO 12000 14662 8900
MHP KORBA WEST CSPGCL HYDRO-HYDRO 170 859 38190
SIKASAR HEP CSPGCL HYDRO-HYDRO 700 418 26870
DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8843 74500
DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 19446 51500
GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 66388 71600
GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127488 41300
KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 96072 43900
KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 29841 56400
SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 184966 58800
UKAI 1-5 GSECL THERMAL-COAL 85000 204891 46900
UKAI TPS 6 GSECL THERMAL-COAL 50000 284448 48200
WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 271999 58300
WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 82808 44100
KADANA HPS GSECL HYDRO-HYDRO 24200 34433 16800
UKAI HPS GSECL HYDRO-HYDRO 30500 40585 6100
TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 123000 11500
BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 8900 10900
BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 7200 27500
JHINNA HPS MPPGCL HYDRO-HYDRO 2000 9700 18500
RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 44300 3400
GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 17300 4600
SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 4100 16900
MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 14600 27000
PENCH HPS MPPGCL HYDRO-HYDRO 16000 23700 8100
RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 3000 16900
AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 134400 35100
SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 283800 38700
SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 344600 34300
SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 111600 61600
SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 211800 58000
SSTPS PH-I MPPGCL THERMAL-COAL 120000 233100 84300
BHUSAWAL TPS MSPGCL THERMAL-COAL 142000 566258 51100
CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1365682 33700
KHAPERKHEDA MSPGCL THERMAL-COAL 134000 706207 39100
KORADI TPS MSPGCL THERMAL-COAL 62000 443206 42000
NASIK TPS MSPGCL THERMAL-COAL 63000 297275 47000
PARLI TPS MSPGCL THERMAL-COAL 113000 175934 71600
PARAS MSPGCL THERMAL-COAL 50000 267931 38700
URAN CCPP MSPGCL THERMAL-GAS 67200 320330 30600
KOYANA MSPGCL HYDRO-HYDRO 195600 328155 13100
SMALL HYDRO POWER PLANTS MSPGCL HYDRO-HYDRO 45400 93062 30500
BHIRA MSPGCL HYDRO-HYDRO 8000 10046 8400
TILLARI MSPGCL HYDRO-HYDRO 8900 10584 3100
SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 233298 20500
SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 87633 20500
PRIVATE SECTOR
Page 36
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 81282 46750
JNSTPP(JAYPEE NIGRIE) JP POWER VENTURES LTD THERMAL-COAL 132000 726695 29310
MB POWER MB POWER THERMAL-COAL 120000 345632 38310
ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 754922 28671
ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 780761 23495
ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 198000 1263784 32090
ADANI POWER MAHARA ADANI POWER LTD THERMAL-COAL 330000 1666191 34124
AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 170065 36827
SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 252035 45129
ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 458551 36000
ESSAR POWER MP LTD ESSAR POWER MP LTD THERMAL-COAL 60000 243040 28600
VEDANTA LTD (P P -I) VEDANTA LTD THERMAL-GAS 3000 15044 24000
VEDANTA LTD (P P -II) VEDANTA LTD THERMAL-GAS 3000 21293 24000
PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 8234600 24000
165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 5850 64390
145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 68717 40349
SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 132655 28776
SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 144686 38567
MUNDRA UMPPCOASTAL GUJARAT POWER
LTD THERMAL-IMP COAL 400000 2530300
23900
LANCO AMARKANTAK TPP PATHADIH
U-ILANCO AMARKAN POWER LTD THERMAL-COAL 30000 195500
29200
LANCO AMARKANTAK TPP PATHADIH
U-IILANCO AMARKAN POWER LTD THERMAL-COAL 30000 206900
27600
BARADARHA TPS D B POWER LTD THERMAL-COAL 120000 677373 29200
JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 405000 28900
JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 453000 40500
DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 339437 40700
TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 293400 44000
TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 137200 37000
TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 174900 44000
BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 92900 14100
BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23700 34300
KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 27600 48300
CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2530300 23900
BHANDARDRA HEP -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 2475 54900
SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 161400 26500
SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 445000 39000
SOTHERN REGION
CENTRAL SECTOR
NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 325699 54820
NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 305532 39880
NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 998805 38510
NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 113016 54070
NEYVELI TAMILNADU POWER LTD JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 625274 42200
VALLUR TPS NTPC TECL THERMAL-COAL 150000 856438 42350
R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 1493 84300
RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1502919 29400
RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 341291 31800
SIMHADRI I NTPC LTD THERMAL-COAL 100000 688382 36800
SIMHADRI II NTPC LTD THERMAL-COAL 100000 663657 43400
KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 593110 31324
MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 291625 21764
KKNPP-1 amp 2 NPCIL NUCLEAR-NUCLEAR 200000 572609 40948
MINICOY LAKSHADEEP THERMAL-DIESEL 340 770 29600
KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1097 29600
AMINI LAKSHADEEP THERMAL-DIESEL 265 509 29600
ANDROTT LAKSHADEEP THERMAL-DIESEL 219 524 29600
KALPENI LAKSHADEEP THERMAL-DIESEL 175 356 29600
AGATTI LAKSHADEEP THERMAL-DIESEL 195 658 29600
KADMAT LAKSHADEEP THERMAL-DIESEL 190 414 29600
KILTAN LAKSHADEEP THERMAL-DIESEL 150 269 29600
CHETLET LAKSHADEEP THERMAL-DIESEL 100 139 29600
BITRA LAKSHADEEP THERMAL-DIESEL 043 024 29600
BANGARAM LAKSHADEEP THERMAL-DIESEL 018 009 29600
Page 37
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) STATE SECTOR
Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 721811 46500
Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 50000 336142 46500
RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 237358 46500
RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 239926 46500
RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 124500 46500
SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 62109 46500
UPPER SILERU APGENCO HYDRO-HYDRO 24000 33000 46500
LOWER SILERU APGENCO HYDRO-HYDRO 46000 81066 46500
DONKARAI APGENCO HYDRO-HYDRO 2500 6007 46500
PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 1262 46500
CHETTIPETA APGENCO HYDRO-HYDRO 100 214 46500
MUCHKUND APGENCO HYDRO-HYDRO 12000 37571 46500
NAGARJUNASAGAR RCPH APGENCO HYDRO-HYDRO 9000 606 46500
TUNGABHADRA HES amp HAMPI(AP
Share)
APGENCO HYDRO-HYDRO 7200 6100 46500
KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 352232 42600
KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 288131 32500
KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 319272 46500
RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 40073 44300
KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 308317 46000
KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 308963 51300
SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 61004 76600
NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 17960 75300
PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 20873 58300
POCHAMPAD-I TSPGENCO HYDRO-HYDRO 2700 5455 29800
POCHAMPAD-II TSPGENCO HYDRO-HYDRO 900 1932 40700
NIZAMSAGAR TSPGENCO HYDRO-HYDRO 1000 1126 53400
RAICHUR TPS 1 to 7 KPCL THERMAL-COAL 147000 890866 43800
RAICHUR TPS 8 KPCL THERMAL-COAL 25000 159523 48200
BELLARI TPS 1 KPCL THERMAL-COAL 50000 318679 51100
BELLARI TPS 2 KPCL THERMAL-COAL 50000 232347 55600
BELLARI TPS 3 KPCL THERMAL-COAL 70000 47565 34400
BHADRA PH KPCL HYDRO-HYDRO 3920 2369 45900
GERUSUPPA PH KPCL HYDRO-HYDRO 24000 26990 22000
GHAT PRABHA HEP KPCL HYDRO-HYDRO 3200 4777 25300
KADRA HPS KPCL HYDRO-HYDRO 15000 16889 26800
NAGJHARI KPCL HYDRO-HYDRO 90000 155159 9800
KODASALLI DPH KPCL HYDRO-HYDRO 12000 14854 19200
MUNIRA+MGH+SPH+SPH KPCL HYDRO-HYDRO 22640 48211 7900
SHARAVATHY HPS KPCL HYDRO-HYDRO 108550 276215 5400
ALMATTI DPH KPCL HYDRO-HYDRO 29000 39611 24600
VARAHI UGPH KPCL HYDRO-HYDRO 46000 71368 15600
IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 17196 15300
IDUKKI HPS KSEB HYDRO-HYDRO 78000 137905 15300
KAKKAD HPS KSEB HYDRO-HYDRO 5000 13063 15300
KALLADA HPS KSEB HYDRO-HYDRO 1500 4436 15300
KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 46544 15300
KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 635 15300
LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 30822 15300
MALANKARA HPS KSEB HYDRO-HYDRO 1050 2474 15300
MATTUPETTY KSEB HYDRO-HYDRO 200 230 15300
MALAMPUZHA KSEB HYDRO-HYDRO 250 063 15300
CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 864 15300
URUMI ST I amp II KSEB HYDRO-HYDRO 615 903 15300
LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 248 15300
NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7765 19625 15300
PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 16601 15300
PANNIAR HPS KSEB HYDRO-HYDRO 3240 6217 15300
PORINGALKUTHU KSEB HYDRO-HYDRO 3600 10052 15300
PORINGALKUTHU LBE KSEB HYDRO-HYDRO 1600 9438 15300
PEPPARA KSEB HYDRO-HYDRO 300 395 15300
POOZHITHODE KSEB HYDRO-HYDRO 480 1045 15300
Page 38
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) PEECHI KSEB HYDRO-HYDRO 125 040 15300
RANI-PERUNADU KSEB HYDRO-HYDRO 400 585 15300
SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 79783 15300
SENGULAM HPS KSEB HYDRO-HYDRO 5120 11558 15300
SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 16711 15300
VILANGAD KSEB HYDRO-HYDRO 750 1578 15300
BARAPOLE KSEB HYDRO-HYDRO 1500 1932 15300
VELLATHOOVAL KSEB HYDRO-HYDRO 360 305 15300
CHIM0NY KSEB HYDRO-HYDRO 250 156 15300
ADYANPARA KSEB HYDRO-HYDRO 350 501 15300
BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 554 15300
KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 3801 15300
KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 23132 32800
ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 14416 62280
METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 523970 62280
METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 321270 62280
NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 336575 62280
NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 591240 62280
TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 508966 62280
KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 30897 62280
VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 18720 90699 62280
KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 33593 62280
BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 1047 62280
PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 1250 62280
PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 330 62280
MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 4897 62280
MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 032 62280
KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15681 62280
KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 40608 62280
KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 21342 62280
KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 4717 62280
KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4322 62280
KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2399 62280
METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 4416 62280
METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 8035 62280
BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2187 62280
BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2359 62280
BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2511 62280
BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 1949 62280
BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 1819 62280
POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 172 62280
SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 241 62280
MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 026 62280
THIRUMOORTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 136 62280
PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 9309 62280
VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 353 62280
SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 4192 62280
PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 6571 62280
SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 1186 62280
SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6319 62280
ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 6122 62280
KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 28674 62280
SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 18381 62280
SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 4258 62280
KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 12680 62280
KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4201 62280
ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 000 62280
PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 19175 62280
AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 078 62280
BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 504 62280
BHAVANI KATTALAI (BKB)(IIIampIII BB I amp II)TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 5847 62280
PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 000 62280
Page 39
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) SRI DAMODARAM STPS APPDCL THERMAL-COAL 160000 808108 36300
PRIVATE SECTOR
KARUPPUR TANJORE LANCO TANJORE PCL THERMAL-GAS 12000 48096 28770
SIMHAPURI ENERGY LTD SIMHAPURI ENERGY LTD THERMAL-COAL 60000 143900 39100
JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 7111 45500
SBU 1 JSW ENERGY LTD
VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 26000 159100
43300
SBU 2 JSW ENERGY LTD
VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 60000 247900
42800
LANCO KPLLANCO KONDAPALLI POWER
LTDTHERMAL-GAS 36814 85060
25776
LANCO KPL STG -IILANCO KONDAPALLI POWER
LTDTHERMAL-GAS 36600 12979
46330
LANCO KPL STG -IIIALANCO KONDAPALLI POWER
LTDTHERMAL-GAS 37100 85710
46330
LANCO KPL STG -III BLANCO KONDAPALLI POWER
LTDTHERMAL-GAS 37100 43639
46330
HINDUJA NATIONAL PCL HINDUJA NATIONAL PCL THERMAL-COAL 104000 303000 38200
MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 121164 49940
UDUPI POWER COR LTD ADANI POWER LTD THERMAL-COAL 120000 754613 42500
SPECTRUM POWER GENERATION
LTD SPECTRUM PG LTD THERMAL-GASN 20525 9256812
34952
TAQA NEYVELI POWER COM PVT
LTD TAQA NEYVELI THERMAL-LIG 25000 5840
34500
ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 251000 51000
ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 207860 36800
GMR VEMAGIRI POWER GENERATION
LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 30117
46450
EASTERN REGION
CENTRAL SECTOR
MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 64675 53113
MTPS STAGE - II KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 39000 1432 69138
BOKARO `B` TPS DVC THERMAL-COAL 63000 145670 31539
MEJIA TPS U 1-3 DVC THERMAL-COAL 63000 348298 31552
MEJIA TPS U 4 DVC THERMAL-COAL 21000 116099 34997
MEJIA TPS U 5-6 DVC THERMAL-COAL 50000 276427 35976
MEJIA TPS U 7-8 DVC THERMAL-COAL 100000 552854 36991
DURGAPUR STEEL TPS DVC THERMAL-COAL 100000 665550 39323
DURGAPUR TPS DVC THERMAL-COAL 21000 59270 35416
RAGHUNATHPUR TPS DVC THERMAL-COAL 120000 201650 35326
MAITHON HYDEL STA DVC HYDRO-HYDRO 6320 12200 17984
CHANDRAPURA TPSU1-3 DVC THERMAL-COAL 42000 257610 35095
CHANDRAPURA TPSU7-8 DVC THERMAL-COAL 50000 306673 34987
KODERMA TPS DVC THERMAL-COAL 100000 380180 38131
PANCHET HPS DVC HYDRO-HYDRO 8000 13360 17984
TILLAYA HPS DVC HYDRO-HYDRO 400 1410 17984
RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34700 35400
TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 277300 23200
TLDP -III NHPC LTD HYDRO-HYDRO 13200 55400 62000
TLDP -IV NHPC LTD HYDRO-HYDRO 16000 60300 25600
FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 957219 33700
FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 308943 41000
BONGAINGAON TPS NTPC LTD THERMAL-COAL 25000 153663 58600
KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 542277 34200
KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 942591 34200
BARH-II NTPC LTD THERMAL-COAL 132000 728021 44500
TALCHER TPS NTPC LTD THERMAL-COAL 46000 335521 30100
TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 702319 25600
TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1436521 24700
STATE SECTOR
BTPS(RampM) BIHAR STATE PGCL THERMAL-COAL 22000 12142 39700
BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 98331 10602
HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 50593 9482
CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 19689 2605
RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 53192 6033
UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 147208 14637
Page 40
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 60353 4519
IB TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 288567 25000
J P H GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 210 038 61100
MEYONG CHU GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 400 1086 61100
TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 122667 38200
DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 214339 43321
KOLAGHAT THERMAL POWER
STATION
WEST BENGAL PDCL THERMAL-COAL 126000 538269 31603
BAKRESHWAR THERMAL POWER
PLANT
WEST BENGAL PDCL THERMAL-COAL 105000 634876 32154
BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 45000 166855 33299
SANTHALDIH THERMAL POWER
STATION
WEST BENGAL PDCL THERMAL-COAL 50000 336442 34932
SAGARDIGHI THERMAL POWER
PROJECT
WEST BENGAL PDCL THERMAL-COAL 160000 423121 34705
JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 20344 68900
RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 24559 68900
TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 4623 68900
PURULIA PUMPED STORAGE
PROJECT
WEST BENGAL SEDCL HYDRO-HYDRO 90000 108816 68900
MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2768 68900
PRIVATE SECTOR
CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 49474 20230
CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 555500 70200
HALDIA ENERGY HALDIA ENERGY LTD THERMAL-COAL 60000 371000 50400
DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3688 63400
KAMALANGA TPS GMR KAMALANGA ENERGY LTD THERMAL-COAL 105000547670
33300
ADHUNIK POWER U-1 ADHUNIK POWER THERMAL-COAL 27000 158 44060
ADHUNIK POWER U-2 ADHUNIK POWER THERMAL-COAL 27000 168 44250
VL-JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 332800 23622
JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 43000 45250
JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 71700 37030
JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 70700 35920
JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 71100 38870
JOJOBERA UNIT 5 TATA POWER COM LTD THERMAL-COAL 12000 79300 44560
JOJOBERA UNIT 6 TATA POWER COM LTD THERMAL-WHR 12000 83700 12840
IEL KALINGANAGAR U-I TATA POWER COM LTD THERMAL-WG 6750 33400 22500
IEL KALINGANAGAR U-II TATA POWER COM LTD THERMAL-WG 6750 34800 22500
MAITHON UNIT 1 amp 2 TATA POWER COM LTD THERMAL-COAL 105000 678000 36100
HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 27500 24340
HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 28400 24340
HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 15800 24310
NORTH EASTERN REGION
CENTRAL SECTOR
LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 74100 36600
AGARTALA GT NEEPCO THERMAL-GAS 13500 88611 27210
ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 153111 32310
DOYANG HEP NEEPCO HYDRO-HYDRO 7500 25598 49801
KOPILI HEP NEEPCO HYDRO-HYDRO 20000 98186 11491
KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 19582 20237
KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 10310 17968
RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 124093 22945
TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 10100 17344 39000
STATE SECTOR
HYDRO POWER (122 Stns) ITANAGAR GOVT OF ARUNACHAL
PRADESHHYDRO-HYDRO 6971 6217270
24600
KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39514 17337
LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 82327 36810
NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 33318 48290
MYNTRIANG SHEP ST II ASSAM POWER GENCO HYDRO-HYDRO 300 567 35776
LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 9130 49200
LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 012 49200
DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 022 49200
TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 000 49200
UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 4990 16000
UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 6476 37000
UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 16494 14600
UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 3600 9556 15000
SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 758 8000
MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44070 44800
KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 154 41400
TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 091 41400
MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 411 41400
MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 394 41400
KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 760 41400
SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 3264 41400
LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 044 41400
BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 18953 28000
ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 43585 28200
GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 4080 11100
Note
LIG Lignite N Naptha WHR Waste Heat Recovery
Page 41
File NoCEA-CH-14-1142018-Coordination Division
1 Executive summary of Target and Achievement of Substations during 2018-19 As on Oct-18
(All figures in circuit MVA)
Centr
al S
ecto
r
Sta
te S
ecto
r
JV
Private
Secto
r
To
tal
Centr
al S
ecto
r
Sta
te S
ecto
r
JV
Private
Secto
r
To
tal
Centr
al S
ecto
r
Sta
te S
ecto
r
JV
Private
Secto
r
To
tal
Centr
al S
ecto
r
Sta
te S
ecto
r
JV
Private
Secto
r
To
tal
Centr
al S
ecto
r
Sta
te S
ecto
r
JV
Private
Secto
r
To
tal
Cen
tral S
ecto
r
Sta
te S
ecto
r
JV
Pri
vate
Secto
r
Gra
nd
To
tal
3000 0 0 3000 0 0 0 0 22200 0 0 22200 8185 13085 630 21900 740 14760 0 15500 34125 27845 630 62600
Oct18 Programme 0 0 0 0 0 0 0 0 0 0 0 0 1000 1260 630 2890 0 1400 0 1400 1000 2660 630 4290
Achievement 0 0 0 0 0 0 0 0 3000 0 0 3000 1500 3120 0 4620 0 2220 0 2220 4500 5340 0 9840
Upto Oct-18 Programme 0 0 0 0 0 0 0 0 10000 0 0 10000 6130 7435 630 14195 0 9670 0 9670 16130 17105 630 33865
Achievement 0 0 0 0 0 0 0 0 14000 0 0 14000 9000 7550 630 17180 0 10610 0 10610 23000 18160 630 41790
21(1)
220 kV Grand Total 800 kV 500 kV
Programme 2018-19
Programme
Achievement
HVDC765 kV 400 kV
File NoCEA-CH-14-1142018-Coordination Division
As on 31-10-18
Sl Voltage Ratio Capacity
No (kVkV) (MWMVA)
1 2 3 4 5
1 Cuddapah Ss 765400 PGCIL 3000
2 Tughlakabad SS (GIS) 400220 PGCIL 1500
Total of CENTRAL SECTOR 4500
3 Panki Kanpur (Aug) TF-I 400200 UPPTCL 75
4 Hindupur ss (1st ICT) 400220 APTRANSCO 315
5 Thappagundu ss 400110 TANTRANSCO 600
6 Mendhasal (2nd power TF) 400220 OPTCL 20
7 Jodhpur ss (New) 400220 RVPNL 315
8 Shankarpally 400220 TSTRANSCO 500
9 Podili ss (1st ICT) 400220 APTRANSCO 315
10 Doni (Gadag)SS 400220 KPTCL 1000
11 Porur (Addl TF) 230110 TANTRANSCO 100
12 Anuppankulam (Addl TF) 230110 TANTRANSCO 60
13 Neyveli SS 230110 TANTRANSCO 480
14 Savarkundla (Aug) 22066 GETCO 60
15 Bhuna (Aug) 220132 HVPNL 100
16 Madanpur (Aug) 22066 HVPNL 100
17 Gurgaon Sec-52A (Aug) 22066 HVPNL 160
18 IA Hisar (Aug) 220132 HVPNL 50
19 Narwana (Aug) 220132 HVPNL 60
20 Therubali (3rd Auto TF) 220132 OPTCL 160
21 Halasar ss 220132 RVPNL 160
22 Bansi Siddaharthnagar (Aug) TF-I 220132 UPPTCL 60
23 Hata Kushinagar (New) TF-I 220132 UPPTCL 100
24 Gomti nagar Lucknow (Aug) TF-IV 22033 UPPTCL 60
25 Kanpur Road Lucknow (New) TF-III 22033 UPPTCL 60
26 Asoj (Aug) 22066 GETCO 150
27 Kangasiyali (Aug) 22066 GETCO 60
28 Karmsad (Aug) 22066 GETCO 160
29 Lalpar (Aug) 22066 GETCO 60
TOTAL STATE SECTOR 5340
GRAND TOTAL 9840
21(2)
PRIVATE SECTOR
CENTRAL SECTOR
STATE SECTOR
2Sub-Stations (220 kV and above) CommissionedReady for commissioning During Oct-2018
Name of Sub StationsExecuting
Agency
File NoCEA-CH-14-1142018-Coordination Division
SN Contents Page
1 Electricity Generation (MU) Targets and Achievements for 2018-19 22
Section E - Electricity Generation
File NoCEA-CH-14-1142018-Coordination Division
Programme Achievement Ach Programme Achievement Ach
Central Sector 35160700 3028100 3162321 10443 20144400 21150469 10499
State Sector 35132000 3010000 3017260 10024 19922100 19549030 9813
PvtIPP Sector 36999700 3240600 3375603 10417 21598300 20794155 9628
PvtUTL Sector 1857600 164500 180597 10979 1130900 1203107 10638
Total 109150000 9443200 9735781 10310 62795700 62696761 9984
Central Sector 5617600 420900 451004 10715 4193000 4045436 9648
State Sector 6110600 559500 708469 12663 4049400 4433000 10947
PvtIPP Sector 1141800 80500 90122 11195 976400 1021963 10467
PvtUTL Sector 130000 11300 12564 11119 76700 99943 13030
Total 13000000 1072200 1262159 11772 9295500 9600342 10328
Central Sector 3850000 353300 303310 8585 2068900 2203540 10651
Total 3850000 353300 303310 8585 2068900 2203540 10651
Bhutan Import 500000 63300 35395 5592 347000 416660 12007
Central Sector 44628300 3802300 3916635 10301 26406300 27399445 10376
State Sector 41242600 3569500 3725729 10438 23971500 23982030 10004
Pvt Sector 40129100 3496900 3658886 10463 23782300 23119168 9721
Total 126500000 10932000 11336645 10370 74507100 74917303 10055
Provisional based on actual-cum-Assesment
Figs in MU
Cummulative
Achievement
Cummulative
Achievement
Sep-18 Sep-17 Upto Sep-2018 Upto Sep-2017
1073794 748889 7332680 5660929
22
Renewable Energy Generation
Achievement
Oct-2018
1 Electricity Generation (MU) Targets and Achievememts for 2018-19
All India Energy Generation During April 2018- Oct 2018 (MU)
Target (2018-19)April 2018- Oct 2018
Sector
Hydro
Thermal
Nuclear
627957
92955
20689
745071
626968
96003
22035
749173
0
100000
200000
300000
400000
500000
600000
700000
800000
Thermal Hydro Nuclear Total
Programme
Achievement
File NoCEA-CH-14-1142018-Coordination Division
SN Contents Page
1 Energy Power Supply Position (Provisional) for Oct-2018 and during April 2018- Oct 2018 23
2 Peak Power Supply Position (Provisional) for Oct-2018 and during April 2018- Oct 2018 24
3 Energy Power Supply Position (Revised) for Sep-2018 and during April 2018- Sept 2018 25
4 Peak Power Supply Position (Revised) for Sep-2018 and during April 2018- Sept 2018 26
5 Notified Power cuts Restrictions on Industries during Oct-2018 27
6 Power Supply to Agricultural Sector during Oct-2018 28
Section F - Power supply position
File NoCEA-CH-14-1142018-Coordination Division
आकड़ मममलयन यननट नट Figures in MU net
ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied
कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )
चडीगढ़ Chandigarh 108 108 0 00 1055 1055 0 00
दिलली Delhi 2490 2489 1 00 22524 22510 14 01
हरियजणज Haryana 4554 4554 0 00 35205 35205 0 00
दहमजचल परिश Himachal Pradesh 788 787 2 02 5728 5560 168 29
रमम कशमीि Jammu amp Kashmir 1497 1219 278 186 10982 8865 2117 193
परजब Punjab 4418 4418 0 00 38832 38819 13 00
िजरसथजन Rajasthan 6748 6748 0 00 45341 45181 160 04
उतति परिश Uttar Pradesh 10136 9973 164 16 75485 74808 676 09
उततिजखड Uttarakhand 1083 1081 3 03 8395 8310 85 10
उततरी कषतर Northern Region 31822 31375 447 14 243547 240314 3233 13
छततीसगढ़ Chhattisgarh 2454 2453 1 00 16119 16091 28 02
गरिजत Gujarat 11636 11636 0 00 70782 70768 14 00
मधय परिश Madhya Pradesh 5860 5859 1 00 38412 38410 2 00
महजिजषटर Maharashtra 15223 15095 128 08 95489 95355 134 01
िमन औि दिउ Daman amp Diu 216 216 0 00 1523 1523 0 00
िजिि व नगि हवली Dadra amp Nagar Haveli 553 553 0 00 3757 3757 0 00
गोवज Goa 366 366 0 00 2497 2495 2 01
पशचिमी कषतर Western Region 36308 36178 130 04 228579 228398 180 01
आनधर परिश Andhra Pradesh 5860 5854 6 01 37377 37334 43 01
तलगजनज Telangana 6748 6742 6 01 38251 38205 46 01
कनजाटक Karnataka 5842 5835 7 01 39111 39059 52 01
किल Kerala 2116 2096 20 09 14256 14160 96 07
तममल नजड Tamil Nadu 8611 8601 10 01 65742 65666 76 01
पडचिी Puducherry 216 215 1 05 1654 1646 8 05
लकष-दवीप Lakshadweep 4 4 0 0 27 27 0 0
दकषकषणी कषतर Southern Region 29392 29342 50 02 196390 196069 321 02
बबहजि Bihar 2742 2738 4 01 19143 18951 192 10
िजमोिि घजटी ननगम DVC 1712 1698 13 08 13096 12828 268 20
झजिखणड Jharkhand 701 697 4 06 5022 4949 73 15
ओडडशज Odisha 3147 3134 13 04 20224 20192 32 02
पशशचम बगजल West Bengal 4204 4200 4 01 33008 32881 127 04
मसशककम Sikkim 40 40 0 00 279 279 0 01
अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 67 202 188 13 67
परवी कषतर Eastern Region 12547 12507 40 03 90772 90080 692 08
अरणजचल परिश Arunachal Pradesh 67 66 1 09 502 496 7 13
असम Assam 833 809 24 29 6153 5903 250 41
मणणपि Manipur 72 71 1 10 485 478 7 14
मघजलय Meghalaya 147 147 0 00 1043 1042 0 00
ममज़ोिम Mizoram 63 62 1 08 365 359 5 14
नजगजलड Nagaland 76 67 8 110 540 481 59 109
बिपिज Tripura 130 129 1 09 1025 1007 19 18
उततर-परवी कषतर North-Eastern Region 1387 1351 35 25 10113 9766 346 34
समपणण भारत All India 111455 110753 702 06 769399 764627 4773 06
23
ऊराण वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Energy Power Supply Position Report (Provisional)
राजयStateअकरबर2018 October2018 अपरल2018 -अकरबर2018 April2018 to October2018
ऊरजा पनत ा म कमी ऊरजा पनत ा म कमीEnergy not Supplied
Excludes energy exported to Bangladesh
Energy not Supplied
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
File NoCEA-CH-14-1142018-Coordination Division
अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met
कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )
चडीगढ़ Chandigarh 217 217 0 00 369 369 0 00
दिलली Delhi 4713 4713 0 00 7016 7016 0 00
हरियजणज Haryana 7948 7948 0 00 10270 10270 0 00
दहमजचल परिश Himachal Pradesh 1520 1520 0 00 1520 1520 0 00
रमम कशमीि Jammu amp Kashmir 2836 2269 567 200 2951 2361 590 200
परजब Punjab 7979 7979 0 00 12638 12638 0 00
िजरसथजन Rajasthan 11450 11450 0 00 11698 11698 0 00
उतति परिश Uttar Pradesh 17434 16745 688 39 20498 20062 436 21
उततिजखड Uttarakhand 1943 1943 0 00 2143 2143 0 00
उततरी कषतर Northern Region 50659 49635 1024 20 63166 61726 1440 23
छततीसगढ़ Chhattisgarh 4414 4268 146 33 4414 4268 146 33
गरिजत Gujarat 18148 18130 19 01 18148 18130 19 01
मधय परिश Madhya Pradesh 11356 11317 39 03 11356 11317 39 03
महजिजषटर Maharashtra 23864 23159 705 30 23864 23254 610 26
िमन औि दिउ Daman amp Diu 342 341 1 02 357 356 1 02
िजिि व नगि हवली Dadra amp Nagar Haveli 784 780 4 05 816 815 1 01
गोवज Goa 536 536 0 00 596 596 0 00
पशचिमी कषतर Western Region 56548 55695 853 15 56548 55695 853 15
आनधर परिश Andhra Pradesh 9435 9435 0 00 9435 9435 0 00
तलगजनज Telangana 10603 10603 0 00 10815 10815 0 00
कनजाटक Karnataka 10741 10741 0 00 10741 10741 0 00
किल Kerala 3727 3644 83 22 4050 3997 53 13
तममल नजड Tamil Nadu 14747 14333 414 28 15029 14981 47 03
पडचिी Puducherry 363 362 1 03 420 400 19 46
लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0
दकषकषणी कषतर Southern Region 45279 45226 53 01 45946 45684 262 06
बबहजि Bihar 4945 4945 0 00 5050 5045 5 01
िजमोिि घजटी ननगम DVC 2729 2729 0 00 2874 2874 0 00
झजिखणड Jharkhand 1260 1260 0 00 1339 1284 55 41
ओडडशज Odisha 5624 5224 400 71 5624 5357 268 48
पशशचम बगजल West Bengal 8775 8775 0 00 9130 9123 7 01
मसशककम Sikkim 86 86 0 00 90 90 0 00
अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7
परवी कषतर Eastern Region 22959 22567 392 17 22959 22567 392 17
अरणजचल परिश Arunachal Pradesh 138 125 13 94 138 133 5 37
असम Assam 1785 1704 81 45 1865 1809 56 30
मणणपि Manipur 187 185 2 11 193 186 7 36
मघजलय Meghalaya 336 336 0 00 371 368 2 07
ममज़ोिम Mizoram 99 97 2 20 103 98 4 41
नजगजलड Nagaland 134 131 3 22 156 138 18 117
बिपिज Tripura 269 269 0 00 298 293 5 17
उततर-परवी कषतर North-Eastern Region 2790 2700 90 32 2967 2850 117 39
समपणण भारत All India 172945 170604 2341 14 177022 175528 1494 08
24
अधिकतम वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Peak Power Supply Position Report (Provisional)
आकड़ मगज वजट नट Figures in MW netअपरल2018 -अकरबर2018 April2018 to October2018
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
मजग की पनता म कमी Demand not Met
Excludes the supply to Bangladesh
राजयStateअकरबर2018 October2018
मजग की पनता म कमी Demand not Met
File NoCEA-CH-14-1142018-Coordination Division
आकड़ मममलयन यननट नट Figures in MU net
ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied
कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )
चडीगढ़ Chandigarh 141 141 0 00 947 947 0 00
दिलली Delhi 2925 2924 1 00 20034 20021 13 01
हरियजणज Haryana 4794 4794 0 00 30651 30651 0 00
दहमजचल परिश Himachal Pradesh 876 853 24 27 4940 4773 167 34
रमम कशमीि Jammu amp Kashmir 1520 1246 274 180 9485 7646 1839 194
परजब Punjab 5575 5575 0 00 34414 34401 13 00
िजरसथजन Rajasthan 6202 6201 0 00 38594 38434 160 04
उतति परिश Uttar Pradesh 10211 10124 86 08 65349 64836 513 08
उततिजखड Uttarakhand 1162 1149 13 11 7311 7229 82 11
उततरी कषतर Northern Region 33405 33008 398 12 211725 208939 2786 13
छततीसगढ़ Chhattisgarh 2403 2388 15 06 13665 13638 27 02
गरिजत Gujarat 10122 10122 0 00 59146 59132 14 00
मधय परिश Madhya Pradesh 5492 5491 1 00 32552 32551 1 00
महजिजषटर Maharashtra 13615 13612 3 00 80266 80260 6 00
िमन औि दिउ Daman amp Diu 221 221 0 00 1306 1306 0 00
िजिि व नगि हवली Dadra amp Nagar Haveli 551 551 0 00 3204 3204 0 00
गोवज Goa 339 339 0 00 2131 2128 2 01
पशचिमी कषतर Western Region 32742 32723 19 01 192270 192220 50 00
आनधर परिश Andhra Pradesh 5294 5287 7 01 31518 31480 37 01
तलगजनज Telangana 6279 6272 8 01 31503 31463 40 01
कनजाटक Karnataka 5701 5693 8 01 33269 33225 45 01
किल Kerala 2050 2026 24 12 12140 12063 76 06
तममल नजड Tamil Nadu 8971 8959 12 01 57131 57065 66 01
पडचिी Puducherry 226 224 2 08 1438 1431 7 05
लकष-दवीप Lakshadweep 4 4 0 0 23 23 0 0
दकषकषणी कषतर Southern Region 28520 28460 60 02 166998 166727 271 02
बबहजि Bihar 2839 2793 46 16 16400 16213 188 11
िजमोिि घजटी ननगम DVC 1901 1750 151 79 11384 11130 254 22
झजिखणड Jharkhand 740 723 17 22 4321 4252 69 16
ओडडशज Odisha 2921 2918 3 01 17077 17058 19 01
पशशचम बगजल West Bengal 4902 4879 23 05 28804 28681 123 04
मसशककम Sikkim 39 39 0 01 239 239 0 01
अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 67 173 162 12 67
परवी कषतर Eastern Region 13341 13102 240 18 78225 77573 652 08
अरणजचल परिश Arunachal Pradesh 74 73 1 10 435 429 6 14
असम Assam 950 914 36 38 5320 5094 226 43
मणणपि Manipur 70 69 1 11 414 408 6 15
मघजलय Meghalaya 150 150 0 01 896 896 0 01
ममज़ोिम Mizoram 58 57 1 12 302 297 5 16
नजगजलड Nagaland 80 72 8 104 464 414 50 108
बिपिज Tripura 192 191 1 07 895 878 17 19
उततर-परवी कषतर North-Eastern Region 1575 1527 48 31 8726 8415 311 36
समपणण भारत All India 109584 108819 765 07 657944 653873 4071 06
Energy not Supplied Energy not Supplied
ससतबर2018 September2018 अपरल2018 -ससतबर2018 April2018 to September2018
ऊरजा पनत ा म कमी ऊरजा पनत ा म कमी
Excludes energy exported to Bangladesh
राजयState
ऊराण वरवदयत आपरतण शथिरत ररपोरण (सशोधित) Energy Power Supply Position Report (Revised)
25
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
File NoCEA-CH-14-1142018-Coordination Division
अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met
कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )
चडीगढ़ Chandigarh 293 293 0 00 369 369 0 00
दिलली Delhi 5358 5358 0 00 7016 7016 0 00
हरियजणज Haryana 9008 9008 0 00 10270 10270 0 00
दहमजचल परिश Himachal Pradesh 1466 1466 0 00 1479 1479 0 00
रमम कशमीि Jammu amp Kashmir 2951 2361 590 200 2951 2361 590 200
परजब Punjab 11405 11405 0 00 12638 12638 0 00
िजरसथजन Rajasthan 10612 10612 0 00 11698 11698 0 00
उतति परिश Uttar Pradesh 18346 18121 225 12 20498 20062 436 21
उततिजखड Uttarakhand 1996 1996 0 00 2143 2143 0 00
उततरी कषतर Northern Region 56407 55649 758 13 63166 61726 1440 23
छततीसगढ़ Chhattisgarh 4404 4075 328 75 4404 4136 268 61
गरिजत Gujarat 16963 16963 0 00 17053 16963 90 05
मधय परिश Madhya Pradesh 8811 8771 41 05 8811 8775 36 04
महजिजषटर Maharashtra 22455 22349 106 05 23395 23254 141 06
िमन औि दिउ Daman amp Diu 357 356 1 02 357 356 1 02
िजिि व नगि हवली Dadra amp Nagar Haveli 816 815 1 01 816 815 1 01
गोवज Goa 596 596 0 00 596 596 0 00
पशचिमी कषतर Western Region 52933 52895 38 01 53841 52895 945 18
आनधर परिश Andhra Pradesh 9435 9416 19 02 9435 9416 19 02
तलगजनज Telangana 10815 10815 0 00 10815 10815 0 00
कनजाटक Karnataka 10103 10090 13 01 10690 10688 2 00
किल Kerala 3888 3638 251 64 4050 3997 53 13
तममल नजड Tamil Nadu 14556 14553 3 00 15029 14981 47 03
पडचिी Puducherry 390 372 17 45 420 400 19 46
लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0
दकषकषणी कषतर Southern Region 45542 45428 114 02 45946 45684 262 06
बबहजि Bihar 5050 5045 5 01 5050 5045 5 01
िजमोिि घजटी ननगम DVC 2641 2641 0 00 2874 2874 0 00
झजिखणड Jharkhand 1233 1233 0 00 1339 1284 55 41
ओडडशज Odisha 4906 4906 0 00 5357 5357 0 00
पशशचम बगजल West Bengal 8644 8639 5 01 9130 9123 7 01
मसशककम Sikkim 78 78 0 00 90 90 0 00
अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7
परवी कषतर Eastern Region 22110 22100 10 00 22470 22290 180 08
अरणजचल परिश Arunachal Pradesh 132 130 2 15 138 133 5 37
असम Assam 1865 1809 56 30 1865 1809 56 30
मणणपि Manipur 184 182 2 13 193 186 7 36
मघजलय Meghalaya 317 317 0 00 371 368 2 07
ममज़ोिम Mizoram 95 93 2 23 103 98 4 41
नजगजलड Nagaland 142 138 5 32 156 138 18 117
बिपिज Tripura 296 293 3 10 298 293 5 17
उततर-परवी कषतर North-Eastern Region 2921 2850 71 24 2967 2850 117 39
समपणण भारत All India 177022 175528 1494 08 177022 175528 1494 08
26
मजग की पनता म कमी मजग की पनता म कमी Demand not MetDemand not Met
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
Excludes the supply to Bangladesh
अधिकतम वरवदयत आपरतण शथिरत ररपोरण (सशोधित) Peak Power Supply Position Report (Revised)
आकड़ मगज वजट नट Figures in MW net
राजयStateससतबर2018 September2018 अपरल2018 -ससतबर2018 April2018 to September2018
File NoCEA-CH-14-1142018-Coordination Division
अकरबर2018 October2018अपरल2018 -अकरबर2018 April2018 to October2018
उततरी कषतर Northern Region
चडीगढ़ Chandigarh Data not received Data not received
दिलली Delhi
हरियजणज Haryana
दहमजचल परिश Himachal Pradesh
रमम कशमीि Jammu amp Kashmir Data not received Data not received
परजब Punjab
िजरसथजन Rajasthanउतति परिश Uttar Pradesh
उततिजखड Uttarakhand
पशचिमी कषतर Western Region
छततीसगढ़ Chhattisgarh
गरिजत Gujarat
मधय परिश Madhya Pradesh
महजिजषटर Maharashtra
गोवज Goa
दकषकषणी कषतर Southern Region
आनधर परिश Andhra Pradesh
तलगजनज Telangana
कनजाटक Karnataka
किल Kerala
तममल नजड Tamil Nadu
पडचिी Puducherryपरवी कषतर Eastern Region
बबहजि Bihar
झजिखणड Jharkhand
ओडडशज Odisha
पशशचम बगजल West Bengal
N
o No
tified
Cuts
N
o No
tified
Cuts
27
अकरबर 2018 म इडथरीर पर वरवदयत करौती का वरवरवरण Notified Power CutsRestrictions on Industries during October2018
राजय कषतर State Regionऊराणमाग करौती EnergyDemand Cut
No Notified Cuts No Notified Cuts
File NoCEA-CH-14-1142018-Coordination Division
अकरबर2018 October2018अपरल2018 -अकरबर2018 April2018 to October2018
उततरी कषतर Northern Region
चडीगढ़ Chandigarh Data not received Data not received
दिलली Delhi Data not received Data not received
हरियजणज Haryana 940 hrsday 0709 - 0950 hrsday
दहमजचल परिश Himachal Pradesh No cut imposed on agriculture consumers and uninterrupted
power is being supplied to agriculture sector
HPSEBL has only 2 agriculture consumers and uninterrupted
power is being supplied to agriculture sector
रमम कशमीि Jammu amp Kashmir Data not received Data not received
परजब Punjab 0507 hrsday 0349 - 0844 hrsday
िजरसथजन Rajasthan 0630 hrsday 0630 hrsday
उतति परिश Uttar Pradesh 1825 hrsday 1814 - 1858 hrsday
उततिजखड Uttarakhand 2350 hrsday 2128 - 2357 hrsday
पशचिमी कषतर Western Region
छततीसगढ़ Chhattisgarh 18hoursday 18 hrsday
गरिजत Gujarat 805 hrsday 805 hrsday
मधय परिश Madhya Pradesh Three-Phase Supply(Irrigation)-947 hrs day
Three-Phase (Mixed) Supply - 2311 hrs day
Three-Phase Supply(Irrigation)- 0933 - 0947 hrs day Three-
Phase (Mixed) Supply - 2300 - 2320 hrs day
महजिजषटर Maharashtra Three-Phase Supply(Irrigation)- 9 hrs day
Three-Phase (Mixed) Supply - 24 hrs day
Three-Phase Supply(Irrigation)- 9 hrs day
Three-Phase (Mixed) Supply - 24 hrs day
गोवज Goa No restriction No restriction
दकषकषणी कषतर Southern Region
आनधर परिश Andhra Pradesh 07 hrsday 07 hrsday
तलगजनज Telangana 24 hoursday 24 hoursday
कनजाटक Karnataka 6 hrsday 6 hrsday
किल Kerala No Restrictions No Restrictions
तममल नजड Tamil Nadu 9 hrsday (6 hrs during day time and 3 hrs during night time) 9 hrsday (6 hrs during day time and 3 hrs during night time)
पडचिी Puducherry No Restrictions No Restrictions
परवी कषतर Eastern Region
बबहजि Bihar About 18 hrsday About 18 hrsday
झजिखणड Jharkhand About 20 hrsday About 20 hrsday
ओडडशज Odisha 24 hrsday 24 hrsday
पशशचम बगजल West Bengal About 23 hrsday About 23 hrsday
28
अकटबर 2018 कषि कषतर को षिदयत आपरति का षििरण Power Supply to Agricultural Sector during October2018
राजय कषतर State Regionऔसत वरवदयत आपरतण घनरो म Average Hours of Supply
On segregated feeders
File NoCEA-CH-14-1142018-Coordination Division
SNo Contents Page
1 Growth of Installed Capacity since 6th Plan 29
2 Progress of Transmission Sector since 6th Plan 30
3 All India Yearly Coal consumption for Power Generation (Utilities)
4 All India Annual Per Capita Consumption of Electricity since -2006
5 Average cost of power supply amp Average realisation (Paisakwh)
6 Growth of Rural Electrification amp Pump Sets Energisation
7 Status of Hydro Schemes Cleared by the CEA in Oct-2018
Section G - Growth of Power Sector
31
32
File NoCEA-CH-14-1142018-Coordination Division
(In MW)
Coal Gas Diesel Total
End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472
End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634
End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537
End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596
End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921
End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703
End of 12th Plan 19216288 2532938 83763 21832988 6780 4447842 50018 31960630
Up to Oct-2018 19599250 2493722 837629 22176734 6780 4548742 7201281 34604757
Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-17) = 51529 MW
Electricity Generation (MU) Targets and Achievements for 2016-17
Coal Gas Diesel Nuclear Hydro Res Total
1959925 2493722 837629 678000 454874 72012805 22925174
29
1 Growth of Installed Capacity Since 6th Plan
Plan YearThermal
Nuclear Hydro RES (MNRE) Total
Total Installed Capacity 34604757 MW
Coal Gas Diesel Nuclear Hydro Res
File NoCEA-CH-14-1142018-Coordination Division
Progress of Transmission Sector in the Country up to Oct 2018
1 TRANSMISSION LINES (All fig in CKM)
At the end of
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
6th plan 0 0 0 0 0 0 0 0 0 0 0 0 1831 4198 0 6029 1641 44364 0 46005 3472 48562 0 52034
7th plan 0 0 0 0 0 0 0 0 0 0 0 0 13068 6756 0 19824 4560 55071 0 59631 17628 61827 0 79455
8th plan 0 0 0 0 1634 0 0 1634 0 0 0 0 23001 13141 0 36142 6564 73036 0 79600 31199 86177 0 117376
9th plan 0 0 0 0 3234 1504 0 4738 751 409 0 1160 29345 20033 0 49378 8687 88306 0 96993 42017 110252 0 152269
10th plan 0 0 0 0 4368 1504 0 5872 1775 409 0 2184 48708 24730 0 73438 9444 105185 0 114629 64295 131828 0 196123
11th Plan 0 0 0 0 5948 1504 1980 9432 4839 411 0 5250 71023 30191 5605 106819 10140 125010 830 135980 91950 157116 8415 257481
12th Plan 6124 0 0 6124 5948 1504 1980 9432 25465 1177 4598 31240 92482 48240 17065 157787 11014 151276 978 163268 141033 202197 24621 367851
13th Plan (Up
to Mar2018)6124 0 0 6124 5948 1504 1980 9432 28666 1512 4881 35059 98247 54286 19067 171600 11258 156497 1000 168755 150243 213799 26928 390970
13th Plan (Up
to Sep-18)6124 0 0 6124 5948 1504 1980 9432 30952 1512 5059 37523 99683 56069 20662 176414 11318 160958 1000 173276 154025 220043 28701 402769
27150
75050
47900
118050
90650
30
IR addition in 12th Plan (up to
March 2017)
Total IR (up to Oct-18)
IR at the end of 11th Plan
IR at the end of 12th Plan
Envisaged IR Capacity at the end
of 13th Plan
Grand Total
Note - The figure upto the end of 10th plan in for stringing progress including the lines not commissioned Now only commissioned lines are reckoned Accordingly the figure for 10th plan (end) may read as 187555 after adjusting with (-) 10852 Ckm
Inter-regional Power Transfer Capacity
plusmn 800 kV HVDC plusmn 500 kV HVDC 765 kV 400 kV 220 kV
File NoCEA-CH-14-1142018-Coordination Division
2004-05 27800
2005-06 28100
2006-07 30200
2007-08 33000
2008-09 35500
2009-10 36700
2010-11 38700
2011-12 41756
2012-13 45460
2013-14 48940
2014-15 53040
2015-16 54590
2016-17 57430
2017-18 60800
Year
2005-06
2006-07
2007-08
2008-09
2009-10
2010-11
2011-12
2012-13
2013-14
2014-15
2015-16
2016-17
2017-18
2004-05 254 209 7568
2005-06 260 221 7636
2006-07 276 227 7423
2007-08 293 239 7727
2008-09 340 263 8713
2009-10 355 268 8870
2010-11 398 303 11975
2011-12 455 330 13514
2012-13 501 376 14867
2013-14 518 175
2014-15 520
6719
7171
3 All India yearly Coal Consumption for Power Generation (Utilities)
YEARCoal Consumption
Million Tonnes
4 All India Annual per Capita consumption of Electricity Since 2006
Per Capita Consumption ( kWh)
6314
(GrossGen+ Net Import) Mid-year population
5 Average cost of power supply amp average realization ( paiseKWH )
Yearcost of supply
(paiseunit)
Realization(paiseunit)
Including AgricultureOnly
Agriculture
1149
7335
7786
91441
8188
88363
957
1010
1075
1122
File NoCEA-CH-14-1142018-Coordination Division
Source- PFC Reports on the performance of State Power Utilities 31
File NoCEA-CH-14-1142018-Coordination Division
Sl
NoExecuting Agency
Installed
Capacity (MW)Cost (Rs crore)
Date of
Clearance
32
No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification
since 2004-05
65291374575 296361511th Plan
Cumu upto End of 11th Plan
596556 21212860
557439Cummulative up to end of 12th Plan
46708
18423975
499150
2003-042004-05
5743
9769
Cumu upto End of 10th Plan
010407 to 310308
010410 to 310311557976840909
010411 to 310312
412667
86293726
3207
482864
12632
1576036
4451722594
15455554
2314176
397343611750
2093311060316074
65109527813884
6 Growth Of Rural Electrification amp Pumpsets Energisation
Plan Year
9th Plan2002-03
134092626
4111
Pump Sets Energised Villages Electricfied (Nos)
2001-02
284064367244
1218
27801997-981998-991999-002000-01
297594
010408 to 310309010409 to 310310
10th Plan
2005-062006-07
322968331020
Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as
Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received
from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made
available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified
villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is
independent of the earlier published reports
No Hydro Electric Project has been issued concurrenceAppraisal letter by CEA during October 2018
7 Status of Hydro Schemes Cleared by the CEA in Oct-2018
Name of Scheme
File NoCEA-CH-14-1142018-Coordination Division
SN Contents Page
1 Rate of sale of power for the year 2016-17 33-41
RATE OF SALE OF POWER FOR THE YEAR 2016-17
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) NORTHERN REGION
CENTRAL SECTOR
BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 18000 66900 19800
CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 54000 222400 21600
CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 30000 144400 19600
CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 23100 91700 42600
PARBATI - III HPS NHPC LTD HYDRO-HYDRO 52000 68200 54800
DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 28000 95600 30000
CHUTAK NHPC LTD HYDRO-HYDRO 4400 22000 79800
DULHASTI HPS NHPC LTD HYDRO-HYDRO 39000 228000 56400
SALAL HPS NHPC LTD HYDRO-HYDRO 69000 342300 11000
TANAKPUR HPS NHPC LTD HYDRO-HYDRO 9420 43000 29600
URI HPS -I NHPC LTD HYDRO-HYDRO 48000 280300 16000
URI HPS - II NHPC LTD HYDRO-HYDRO 24000 147300 48600
NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 4500 24600 88200
SEWA - II NHPC LTD HYDRO-HYDRO 12000 47100 43400
ANTA CCPP NTPC LTD THERMAL-GASN 41930 67539 32400
AURAIYA CCPP NTPC LTD THERMAL-GASN 66336 53501 39100
BADARPUR TPS NTPC LTD THERMAL-COAL 70500 159153 44800
DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 84000 296170 42300
DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 98000 526686 46300
DADRI CCPP NTPC LTD THERMAL-GASHSD 82978 227469 33000
FARIDABAD CCPP NTPC LTD THERMAL-GASN 43159 115577 30800
RIHAND STPS I NTPC LTD THERMAL-COAL 100000 596766 24500
RIHAND STPS II NTPC LTD THERMAL-COAL 100000 737069 24600
RIHAND STPS III NTPC LTD THERMAL-COAL 100000 706546 30600
SINGRAULI STPS NTPC LTD THERMAL-COAL 200000 1394068 20400
TANDA TPS NTPC LTD THERMAL-COAL 44000 295438 40800
UNCHAHAR TPS I NTPC LTD THERMAL-COAL 42000 256454 39800
UNCHAHAR TPS II NTPC LTD THERMAL-COAL 42000 273577 38900
UNCHAHAR TPS III NTPC LTD THERMAL-COAL 21000 142780 43000
KOLDAM NTPC LTD HYDRO-HYDRO 80000 363260 43600
NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 303575 25841
RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 108000 668677 35374
NJHPS SJVNL HYDRO-HYDRO 150000 699496 23820
RAMPUR HPS SJVNL HYDRO-HYDRO 41202 195982 32260
TEHRI HPP THDC HYDRO-HYDRO 100000 272543 51800
KOTESHWAR HEP THDC HYDRO-HYDRO 40000 106244 53400
IGSTPS JHAJJAR ARAVALI P CPL THERMAL-COAL 150000 510429 49490
NEYVELI BARSINGSAR NEYVELI LIG CORP LTD THERMAL-LIG 25000 127520 38040
STATE SECTOR
PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 21000 14222 48200
PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 21000 19205 48400
PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 25000 102257 42600
PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 25000 62107 41800
DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 60000 312213 41000
RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 120000 35767442200
WYC HYDEL STATION HPGCL HYDRO-HYDRO 6240 20365 24900
GIRI POWER HOUSE HPSEB HYDRO-HYDRO 6000 13958 7600
ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 1695 5467 11900
BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 12000 18528 6700
GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 2250 7462 22500
BASSI POWER HOUSE HPSEB HYDRO-HYDRO 6600 29649 7500
BINWA POWER HOUSE HPSEB HYDRO-HYDRO 600 2749 19300
ANNEXURE-I
RATE OF SALE OF POWER FOR THE YEAR 2016-2017
Page 33
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) GAJ POWER HOUSE HPSEB HYDRO-HYDRO 1050 2914 26700
BANER POWER HOUSE HPSEB HYDRO-HYDRO 1200 2864 16200
HOLI POWER HOUSE HPSEB HYDRO-HYDRO 300 616 22500
THIROT POWER HOUSE HPSEB HYDRO-HYDRO 450 1126 22500
KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 1200 3064 22500
LARJI POWER HOUSE HPSEB HYDRO-HYDRO 12600 53677 23700
NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 250 750 31000
CHABA POWER HOUSE HPSEB HYDRO-HYDRO 175 465 23300
RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 150 101 13400
SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 200 000 22500
KILLAR HPSEB HYDRO-HYDRO 030 050 22500
BHABA AUGUMENP H HPSEB HYDRO-HYDRO 450 1276 22500
BS CHAMBA HPSEB HYDRO-HYDRO 045 099 19500
GUMMA HPSEB HYDRO-HYDRO 300 423 22500
GAS TURBINE POWER STATION IPGCL THERMAL-GAS 27000 67233 39300
PPS-I PPCL THERMAL-GAS 33000 175905 38300
PPS-III PPCL THERMAL-GAS 137120 196879 36100
LOWER JHELUM JampKPDD HYDRO-HYDRO 10500 60214 5100
UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 2260 10514 6300
UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 10500 44202 8500
GANDHARBAL JampKPDD HYDRO-HYDRO 1500 8925 4700
KARNAH MPH JampKPDD HYDRO-HYDRO 200 1122 31000
CHENANI I JampKPDD HYDRO-HYDRO 2330 10892 6600
CHENANI II JampKPDD HYDRO-HYDRO 200 1188 9300
CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 750 3634 14200
IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 375 2108 18500
IGO MERCHELLONG JampKPDD HYDRO-HYDRO 300 1572 29700
PAHALGAM MHP JampKPDD HYDRO-HYDRO 450 1713 32900
MARPACHOO JampKPDD HYDRO-HYDRO 075 375 29800
HAFTAL JampKPDD HYDRO-HYDRO 100 483 28700
SANJAK JampKPDD HYDRO-HYDRO 126 441 36000
SEWA-III JampKPDD HYDRO-HYDRO 900 3273 20200
BHADERWAH JampKPDD HYDRO-HYDRO 150 935 8900
BAZGO JampKPDD HYDRO-HYDRO 030 108 33300
SUMOOR JampKPDD HYDRO-HYDRO 010 045 35400
HUNDER JampKPDD HYDRO-HYDRO 040 176 26200
STAKNA JampKPDD HYDRO-HYDRO 400 1933 4100
KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 124000 662879 31360
SURATGARH TPS RRVUNL THERMAL-COAL 150000 402328 41730
CHHABRA TPS 1amp 2 RRVUNL THERMAL-COAL 50000 305946 36700
CHHABRA TPS 3 RRVUNL THERMAL-COAL 25000 151536 36700
CHHABRA TPS 4 RRVUNL THERMAL-COAL 25000 155896 36700
RAMGARH GT POWER PROJECT RRVUNL THERMAL-COAL 22050 43177 41800
RAMGARH GAS T P PROJECT 3 RRVUNL THERMAL-GAS 5000 93615 41800
DHOLPUR C C POWER PROJECT RRVUNL THERMAL-R-LNG 33000 9486 46110
MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 14000 20855 34192
MINI MICRO HYDEL (MMH) P S RRVUNL HYDRO-HYDRO 2385 851 37800
KALISINDH TPP 1 RRVUNL THERMAL-COAL 60000 341543 45000
KALISINDH TPP 2 RRVUNL THERMAL-COAL 60000 211588 45000
KHARA HEP UPJVNL HYDRO-HYDRO 7200 26654 7200
MATATILLA HEP UPJVNL HYDRO-HYDRO 3060 12219 6500
OBRA HEP UPJVNL HYDRO-HYDRO 9900 21517 6300
RIHAND UPJVNL HYDRO-HYDRO 30000 57369 5500
ANPARA A TPS UPRVUNL THERMAL-COAL 63000 317536 27000
ANPARA B TPS UPRVUNL THERMAL-COAL 100000 705605 22700
ANPARA D UPRVUNL THERMAL-COAL 100000 300158 39800
HARDUAGANJ TPS UPRVUNL THERMAL-COAL 16500 45817 49200
HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 50000 304389 46600
OBRA A TPS UPRVUNL THERMAL-COAL 28800 13158 34000
OBRA B TPS UPRVUNL THERMAL-COAL 100000 328124 21900
Page 34
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) PANKI TPS UPRVUNL THERMAL-COAL 21000 66488 50300
PARICHHA TPS UPRVUNL THERMAL-COAL 22000 38762 49400
PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 42000 231931 45600
PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 50000 276722 50400
CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 24000 70845 8290
CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 14400 75366 8390
DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 3375 9595 12080
DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 5100 18701 10520
KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4140 17359 12330
KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 12000 33001 9420
KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 3000 11953 8320
TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 9000 33983 12460
MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 30400 124510 16110
RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 19800 17897 10550
MPUR UTTARAKHAND JVNL HYDRO-HYDRO 930 5121 19200
PATHRI UTTARAKHAND JVNL HYDRO-HYDRO 2040 11636 14200
GALOGI UTTARAKHAND JVNL HYDRO-HYDRO 300 648 12500
PRIVATE SECTOR
MGTPP CLP INDIA PVT LTD THERMAL-COAL 132000 268902 41940
SHRINAGAR HEP ALAKNANDA HPCL HYDRO-HYDRO 33000 127414 48800
GAMA INFRAPROP CCPP GAMA INFRAPROP PVT THERMAL-GAS 22500 52686 47000
PPGCL (BARA) JP POWER VENTURES LTD THERMAL-COAL 198000 448200 38500
MALANA HEP MALANA PCL HYDRO-HYDRO 8600 26354 29792
MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 10000 30369 32580
ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 19200 56347 36079
KASHANG HEP H P PCL HYDRO-HYDRO 19500 5034 29200
BASPA-II HEP HBPCL HYDRO-HYDRO 30000 132769 13600
KARCHAM WANGTOO HEP HBPCL HYDRO-HYDRO 100000 434386 36600
RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 108000 582600 43700
RITHALA COMBI CY POWER PLANT TATA POWER DDL THERMAL-GAS 9480 000 11900
RAJPURA TPS NABHA POWER LTD THERMAL-GAS 140000 901484 39000
TALWANDI SABO POWER LTD TALWANDI SABO POWER LTD THERMAL-COAL 198000 636040 49548
ROJA THERMAL POWER STATION ROJA POWER SCL THERMAL-COAL 120000 727200 43400
KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 34400 63400
BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 36000 62600
MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 38200 60800
UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 37900 61500
KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 42300 58800
LALITPUR PGCL BAJAJ ENERGY PVT LTD THERMAL-COAL 198000 359400 47300
PRAYAGRAJ PGCL PRAYAGRAJ PGCL THERMAL-COAL 132000 448200 38595
KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 132000 783182 33438
WESTERN REGION
CENTRAL SECTOR
INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 100000 325333 23892
OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 52000 141663 34001
GANDHAR CCPP NTPC LTD THERMAL-GAS 65739 221924 28700
KAWAS CCPP NTPC LTD THERMAL-GASN 65620 167929 27000
KORBA I amp II NTPC LTD THERMAL-COAL 210000 1499171 20500
KORBA III NTPC LTD THERMAL-COAL 50000 358746 26600
SIPAT STPS I NTPC LTD THERMAL-COAL 198000 1479902 26800
SIPAT STPS II NTPC LTD THERMAL-COAL 100000 766549 26500
VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 126000 693142 25800
VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 100000 608781 23800
VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 100000 673475 27600
VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 100000 655924 32900
VINDHYACHAL STPS V NTPC LTD THERMAL-COAL 50000 328265 31700
MOUDA I NTPC LTD THERMAL-COAL 100000 343130 44500
MOUDA Ii NTPC LTD THERMAL-COAL 66000 40637 39900
RATNAGIRI GAS amp POWER PVT LTD RGPPL THERMAL-GAS 196708 442485 47000
KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 000 24729
TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 32000 201227 10740
Page 35
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 365122 19069
TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 787444 29324
STATE SECTOR
GSEG-HAZIRA15610 MW GUJARAT S ENEGEN LTD THERMAL-GAS 15610 1805 28200
GSEG-HAZIRA35143 MW GUJARAT S ENEGEN LTD THERMAL-GAS 35130 22276 51300
GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 21978 51800
AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 13929 26100
KORBA TPS EAST CSPGCL THERMAL-COAL 44000 198673 33880
DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 365808 27570
KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 316500 30420
HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 532878 19410
CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 515 58300
MTTPS CHAMPA U-I CSPGCL THERMAL-COAL 50000 220376 39000
MTTPS CHAMPA U-II CSPGCL THERMAL-COAL 50000 23709 10000
SHP GANGREL CSPGCL HYDRO-HYDRO 1000 2350 36790
BANGO HEP CSPGCL HYDRO-HYDRO 12000 14662 8900
MHP KORBA WEST CSPGCL HYDRO-HYDRO 170 859 38190
SIKASAR HEP CSPGCL HYDRO-HYDRO 700 418 26870
DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8843 74500
DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 19446 51500
GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 66388 71600
GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127488 41300
KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 96072 43900
KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 29841 56400
SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 184966 58800
UKAI 1-5 GSECL THERMAL-COAL 85000 204891 46900
UKAI TPS 6 GSECL THERMAL-COAL 50000 284448 48200
WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 271999 58300
WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 82808 44100
KADANA HPS GSECL HYDRO-HYDRO 24200 34433 16800
UKAI HPS GSECL HYDRO-HYDRO 30500 40585 6100
TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 123000 11500
BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 8900 10900
BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 7200 27500
JHINNA HPS MPPGCL HYDRO-HYDRO 2000 9700 18500
RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 44300 3400
GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 17300 4600
SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 4100 16900
MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 14600 27000
PENCH HPS MPPGCL HYDRO-HYDRO 16000 23700 8100
RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 3000 16900
AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 134400 35100
SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 283800 38700
SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 344600 34300
SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 111600 61600
SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 211800 58000
SSTPS PH-I MPPGCL THERMAL-COAL 120000 233100 84300
BHUSAWAL TPS MSPGCL THERMAL-COAL 142000 566258 51100
CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1365682 33700
KHAPERKHEDA MSPGCL THERMAL-COAL 134000 706207 39100
KORADI TPS MSPGCL THERMAL-COAL 62000 443206 42000
NASIK TPS MSPGCL THERMAL-COAL 63000 297275 47000
PARLI TPS MSPGCL THERMAL-COAL 113000 175934 71600
PARAS MSPGCL THERMAL-COAL 50000 267931 38700
URAN CCPP MSPGCL THERMAL-GAS 67200 320330 30600
KOYANA MSPGCL HYDRO-HYDRO 195600 328155 13100
SMALL HYDRO POWER PLANTS MSPGCL HYDRO-HYDRO 45400 93062 30500
BHIRA MSPGCL HYDRO-HYDRO 8000 10046 8400
TILLARI MSPGCL HYDRO-HYDRO 8900 10584 3100
SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 233298 20500
SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 87633 20500
PRIVATE SECTOR
Page 36
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 81282 46750
JNSTPP(JAYPEE NIGRIE) JP POWER VENTURES LTD THERMAL-COAL 132000 726695 29310
MB POWER MB POWER THERMAL-COAL 120000 345632 38310
ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 754922 28671
ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 780761 23495
ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 198000 1263784 32090
ADANI POWER MAHARA ADANI POWER LTD THERMAL-COAL 330000 1666191 34124
AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 170065 36827
SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 252035 45129
ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 458551 36000
ESSAR POWER MP LTD ESSAR POWER MP LTD THERMAL-COAL 60000 243040 28600
VEDANTA LTD (P P -I) VEDANTA LTD THERMAL-GAS 3000 15044 24000
VEDANTA LTD (P P -II) VEDANTA LTD THERMAL-GAS 3000 21293 24000
PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 8234600 24000
165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 5850 64390
145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 68717 40349
SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 132655 28776
SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 144686 38567
MUNDRA UMPPCOASTAL GUJARAT POWER
LTD THERMAL-IMP COAL 400000 2530300
23900
LANCO AMARKANTAK TPP PATHADIH
U-ILANCO AMARKAN POWER LTD THERMAL-COAL 30000 195500
29200
LANCO AMARKANTAK TPP PATHADIH
U-IILANCO AMARKAN POWER LTD THERMAL-COAL 30000 206900
27600
BARADARHA TPS D B POWER LTD THERMAL-COAL 120000 677373 29200
JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 405000 28900
JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 453000 40500
DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 339437 40700
TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 293400 44000
TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 137200 37000
TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 174900 44000
BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 92900 14100
BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23700 34300
KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 27600 48300
CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2530300 23900
BHANDARDRA HEP -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 2475 54900
SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 161400 26500
SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 445000 39000
SOTHERN REGION
CENTRAL SECTOR
NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 325699 54820
NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 305532 39880
NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 998805 38510
NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 113016 54070
NEYVELI TAMILNADU POWER LTD JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 625274 42200
VALLUR TPS NTPC TECL THERMAL-COAL 150000 856438 42350
R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 1493 84300
RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1502919 29400
RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 341291 31800
SIMHADRI I NTPC LTD THERMAL-COAL 100000 688382 36800
SIMHADRI II NTPC LTD THERMAL-COAL 100000 663657 43400
KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 593110 31324
MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 291625 21764
KKNPP-1 amp 2 NPCIL NUCLEAR-NUCLEAR 200000 572609 40948
MINICOY LAKSHADEEP THERMAL-DIESEL 340 770 29600
KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1097 29600
AMINI LAKSHADEEP THERMAL-DIESEL 265 509 29600
ANDROTT LAKSHADEEP THERMAL-DIESEL 219 524 29600
KALPENI LAKSHADEEP THERMAL-DIESEL 175 356 29600
AGATTI LAKSHADEEP THERMAL-DIESEL 195 658 29600
KADMAT LAKSHADEEP THERMAL-DIESEL 190 414 29600
KILTAN LAKSHADEEP THERMAL-DIESEL 150 269 29600
CHETLET LAKSHADEEP THERMAL-DIESEL 100 139 29600
BITRA LAKSHADEEP THERMAL-DIESEL 043 024 29600
BANGARAM LAKSHADEEP THERMAL-DIESEL 018 009 29600
Page 37
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) STATE SECTOR
Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 721811 46500
Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 50000 336142 46500
RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 237358 46500
RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 239926 46500
RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 124500 46500
SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 62109 46500
UPPER SILERU APGENCO HYDRO-HYDRO 24000 33000 46500
LOWER SILERU APGENCO HYDRO-HYDRO 46000 81066 46500
DONKARAI APGENCO HYDRO-HYDRO 2500 6007 46500
PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 1262 46500
CHETTIPETA APGENCO HYDRO-HYDRO 100 214 46500
MUCHKUND APGENCO HYDRO-HYDRO 12000 37571 46500
NAGARJUNASAGAR RCPH APGENCO HYDRO-HYDRO 9000 606 46500
TUNGABHADRA HES amp HAMPI(AP
Share)
APGENCO HYDRO-HYDRO 7200 6100 46500
KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 352232 42600
KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 288131 32500
KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 319272 46500
RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 40073 44300
KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 308317 46000
KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 308963 51300
SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 61004 76600
NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 17960 75300
PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 20873 58300
POCHAMPAD-I TSPGENCO HYDRO-HYDRO 2700 5455 29800
POCHAMPAD-II TSPGENCO HYDRO-HYDRO 900 1932 40700
NIZAMSAGAR TSPGENCO HYDRO-HYDRO 1000 1126 53400
RAICHUR TPS 1 to 7 KPCL THERMAL-COAL 147000 890866 43800
RAICHUR TPS 8 KPCL THERMAL-COAL 25000 159523 48200
BELLARI TPS 1 KPCL THERMAL-COAL 50000 318679 51100
BELLARI TPS 2 KPCL THERMAL-COAL 50000 232347 55600
BELLARI TPS 3 KPCL THERMAL-COAL 70000 47565 34400
BHADRA PH KPCL HYDRO-HYDRO 3920 2369 45900
GERUSUPPA PH KPCL HYDRO-HYDRO 24000 26990 22000
GHAT PRABHA HEP KPCL HYDRO-HYDRO 3200 4777 25300
KADRA HPS KPCL HYDRO-HYDRO 15000 16889 26800
NAGJHARI KPCL HYDRO-HYDRO 90000 155159 9800
KODASALLI DPH KPCL HYDRO-HYDRO 12000 14854 19200
MUNIRA+MGH+SPH+SPH KPCL HYDRO-HYDRO 22640 48211 7900
SHARAVATHY HPS KPCL HYDRO-HYDRO 108550 276215 5400
ALMATTI DPH KPCL HYDRO-HYDRO 29000 39611 24600
VARAHI UGPH KPCL HYDRO-HYDRO 46000 71368 15600
IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 17196 15300
IDUKKI HPS KSEB HYDRO-HYDRO 78000 137905 15300
KAKKAD HPS KSEB HYDRO-HYDRO 5000 13063 15300
KALLADA HPS KSEB HYDRO-HYDRO 1500 4436 15300
KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 46544 15300
KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 635 15300
LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 30822 15300
MALANKARA HPS KSEB HYDRO-HYDRO 1050 2474 15300
MATTUPETTY KSEB HYDRO-HYDRO 200 230 15300
MALAMPUZHA KSEB HYDRO-HYDRO 250 063 15300
CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 864 15300
URUMI ST I amp II KSEB HYDRO-HYDRO 615 903 15300
LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 248 15300
NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7765 19625 15300
PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 16601 15300
PANNIAR HPS KSEB HYDRO-HYDRO 3240 6217 15300
PORINGALKUTHU KSEB HYDRO-HYDRO 3600 10052 15300
PORINGALKUTHU LBE KSEB HYDRO-HYDRO 1600 9438 15300
PEPPARA KSEB HYDRO-HYDRO 300 395 15300
POOZHITHODE KSEB HYDRO-HYDRO 480 1045 15300
Page 38
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) PEECHI KSEB HYDRO-HYDRO 125 040 15300
RANI-PERUNADU KSEB HYDRO-HYDRO 400 585 15300
SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 79783 15300
SENGULAM HPS KSEB HYDRO-HYDRO 5120 11558 15300
SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 16711 15300
VILANGAD KSEB HYDRO-HYDRO 750 1578 15300
BARAPOLE KSEB HYDRO-HYDRO 1500 1932 15300
VELLATHOOVAL KSEB HYDRO-HYDRO 360 305 15300
CHIM0NY KSEB HYDRO-HYDRO 250 156 15300
ADYANPARA KSEB HYDRO-HYDRO 350 501 15300
BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 554 15300
KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 3801 15300
KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 23132 32800
ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 14416 62280
METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 523970 62280
METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 321270 62280
NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 336575 62280
NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 591240 62280
TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 508966 62280
KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 30897 62280
VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 18720 90699 62280
KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 33593 62280
BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 1047 62280
PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 1250 62280
PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 330 62280
MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 4897 62280
MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 032 62280
KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15681 62280
KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 40608 62280
KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 21342 62280
KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 4717 62280
KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4322 62280
KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2399 62280
METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 4416 62280
METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 8035 62280
BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2187 62280
BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2359 62280
BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2511 62280
BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 1949 62280
BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 1819 62280
POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 172 62280
SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 241 62280
MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 026 62280
THIRUMOORTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 136 62280
PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 9309 62280
VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 353 62280
SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 4192 62280
PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 6571 62280
SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 1186 62280
SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6319 62280
ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 6122 62280
KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 28674 62280
SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 18381 62280
SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 4258 62280
KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 12680 62280
KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4201 62280
ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 000 62280
PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 19175 62280
AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 078 62280
BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 504 62280
BHAVANI KATTALAI (BKB)(IIIampIII BB I amp II)TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 5847 62280
PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 000 62280
Page 39
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) SRI DAMODARAM STPS APPDCL THERMAL-COAL 160000 808108 36300
PRIVATE SECTOR
KARUPPUR TANJORE LANCO TANJORE PCL THERMAL-GAS 12000 48096 28770
SIMHAPURI ENERGY LTD SIMHAPURI ENERGY LTD THERMAL-COAL 60000 143900 39100
JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 7111 45500
SBU 1 JSW ENERGY LTD
VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 26000 159100
43300
SBU 2 JSW ENERGY LTD
VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 60000 247900
42800
LANCO KPLLANCO KONDAPALLI POWER
LTDTHERMAL-GAS 36814 85060
25776
LANCO KPL STG -IILANCO KONDAPALLI POWER
LTDTHERMAL-GAS 36600 12979
46330
LANCO KPL STG -IIIALANCO KONDAPALLI POWER
LTDTHERMAL-GAS 37100 85710
46330
LANCO KPL STG -III BLANCO KONDAPALLI POWER
LTDTHERMAL-GAS 37100 43639
46330
HINDUJA NATIONAL PCL HINDUJA NATIONAL PCL THERMAL-COAL 104000 303000 38200
MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 121164 49940
UDUPI POWER COR LTD ADANI POWER LTD THERMAL-COAL 120000 754613 42500
SPECTRUM POWER GENERATION
LTD SPECTRUM PG LTD THERMAL-GASN 20525 9256812
34952
TAQA NEYVELI POWER COM PVT
LTD TAQA NEYVELI THERMAL-LIG 25000 5840
34500
ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 251000 51000
ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 207860 36800
GMR VEMAGIRI POWER GENERATION
LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 30117
46450
EASTERN REGION
CENTRAL SECTOR
MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 64675 53113
MTPS STAGE - II KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 39000 1432 69138
BOKARO `B` TPS DVC THERMAL-COAL 63000 145670 31539
MEJIA TPS U 1-3 DVC THERMAL-COAL 63000 348298 31552
MEJIA TPS U 4 DVC THERMAL-COAL 21000 116099 34997
MEJIA TPS U 5-6 DVC THERMAL-COAL 50000 276427 35976
MEJIA TPS U 7-8 DVC THERMAL-COAL 100000 552854 36991
DURGAPUR STEEL TPS DVC THERMAL-COAL 100000 665550 39323
DURGAPUR TPS DVC THERMAL-COAL 21000 59270 35416
RAGHUNATHPUR TPS DVC THERMAL-COAL 120000 201650 35326
MAITHON HYDEL STA DVC HYDRO-HYDRO 6320 12200 17984
CHANDRAPURA TPSU1-3 DVC THERMAL-COAL 42000 257610 35095
CHANDRAPURA TPSU7-8 DVC THERMAL-COAL 50000 306673 34987
KODERMA TPS DVC THERMAL-COAL 100000 380180 38131
PANCHET HPS DVC HYDRO-HYDRO 8000 13360 17984
TILLAYA HPS DVC HYDRO-HYDRO 400 1410 17984
RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34700 35400
TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 277300 23200
TLDP -III NHPC LTD HYDRO-HYDRO 13200 55400 62000
TLDP -IV NHPC LTD HYDRO-HYDRO 16000 60300 25600
FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 957219 33700
FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 308943 41000
BONGAINGAON TPS NTPC LTD THERMAL-COAL 25000 153663 58600
KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 542277 34200
KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 942591 34200
BARH-II NTPC LTD THERMAL-COAL 132000 728021 44500
TALCHER TPS NTPC LTD THERMAL-COAL 46000 335521 30100
TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 702319 25600
TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1436521 24700
STATE SECTOR
BTPS(RampM) BIHAR STATE PGCL THERMAL-COAL 22000 12142 39700
BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 98331 10602
HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 50593 9482
CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 19689 2605
RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 53192 6033
UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 147208 14637
Page 40
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 60353 4519
IB TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 288567 25000
J P H GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 210 038 61100
MEYONG CHU GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 400 1086 61100
TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 122667 38200
DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 214339 43321
KOLAGHAT THERMAL POWER
STATION
WEST BENGAL PDCL THERMAL-COAL 126000 538269 31603
BAKRESHWAR THERMAL POWER
PLANT
WEST BENGAL PDCL THERMAL-COAL 105000 634876 32154
BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 45000 166855 33299
SANTHALDIH THERMAL POWER
STATION
WEST BENGAL PDCL THERMAL-COAL 50000 336442 34932
SAGARDIGHI THERMAL POWER
PROJECT
WEST BENGAL PDCL THERMAL-COAL 160000 423121 34705
JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 20344 68900
RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 24559 68900
TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 4623 68900
PURULIA PUMPED STORAGE
PROJECT
WEST BENGAL SEDCL HYDRO-HYDRO 90000 108816 68900
MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2768 68900
PRIVATE SECTOR
CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 49474 20230
CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 555500 70200
HALDIA ENERGY HALDIA ENERGY LTD THERMAL-COAL 60000 371000 50400
DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3688 63400
KAMALANGA TPS GMR KAMALANGA ENERGY LTD THERMAL-COAL 105000547670
33300
ADHUNIK POWER U-1 ADHUNIK POWER THERMAL-COAL 27000 158 44060
ADHUNIK POWER U-2 ADHUNIK POWER THERMAL-COAL 27000 168 44250
VL-JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 332800 23622
JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 43000 45250
JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 71700 37030
JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 70700 35920
JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 71100 38870
JOJOBERA UNIT 5 TATA POWER COM LTD THERMAL-COAL 12000 79300 44560
JOJOBERA UNIT 6 TATA POWER COM LTD THERMAL-WHR 12000 83700 12840
IEL KALINGANAGAR U-I TATA POWER COM LTD THERMAL-WG 6750 33400 22500
IEL KALINGANAGAR U-II TATA POWER COM LTD THERMAL-WG 6750 34800 22500
MAITHON UNIT 1 amp 2 TATA POWER COM LTD THERMAL-COAL 105000 678000 36100
HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 27500 24340
HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 28400 24340
HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 15800 24310
NORTH EASTERN REGION
CENTRAL SECTOR
LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 74100 36600
AGARTALA GT NEEPCO THERMAL-GAS 13500 88611 27210
ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 153111 32310
DOYANG HEP NEEPCO HYDRO-HYDRO 7500 25598 49801
KOPILI HEP NEEPCO HYDRO-HYDRO 20000 98186 11491
KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 19582 20237
KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 10310 17968
RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 124093 22945
TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 10100 17344 39000
STATE SECTOR
HYDRO POWER (122 Stns) ITANAGAR GOVT OF ARUNACHAL
PRADESHHYDRO-HYDRO 6971 6217270
24600
KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39514 17337
LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 82327 36810
NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 33318 48290
MYNTRIANG SHEP ST II ASSAM POWER GENCO HYDRO-HYDRO 300 567 35776
LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 9130 49200
LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 012 49200
DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 022 49200
TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 000 49200
UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 4990 16000
UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 6476 37000
UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 16494 14600
UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 3600 9556 15000
SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 758 8000
MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44070 44800
KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 154 41400
TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 091 41400
MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 411 41400
MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 394 41400
KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 760 41400
SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 3264 41400
LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 044 41400
BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 18953 28000
ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 43585 28200
GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 4080 11100
Note
LIG Lignite N Naptha WHR Waste Heat Recovery
Page 41
File NoCEA-CH-14-1142018-Coordination Division
As on 31-10-18
Sl Voltage Ratio Capacity
No (kVkV) (MWMVA)
1 2 3 4 5
1 Cuddapah Ss 765400 PGCIL 3000
2 Tughlakabad SS (GIS) 400220 PGCIL 1500
Total of CENTRAL SECTOR 4500
3 Panki Kanpur (Aug) TF-I 400200 UPPTCL 75
4 Hindupur ss (1st ICT) 400220 APTRANSCO 315
5 Thappagundu ss 400110 TANTRANSCO 600
6 Mendhasal (2nd power TF) 400220 OPTCL 20
7 Jodhpur ss (New) 400220 RVPNL 315
8 Shankarpally 400220 TSTRANSCO 500
9 Podili ss (1st ICT) 400220 APTRANSCO 315
10 Doni (Gadag)SS 400220 KPTCL 1000
11 Porur (Addl TF) 230110 TANTRANSCO 100
12 Anuppankulam (Addl TF) 230110 TANTRANSCO 60
13 Neyveli SS 230110 TANTRANSCO 480
14 Savarkundla (Aug) 22066 GETCO 60
15 Bhuna (Aug) 220132 HVPNL 100
16 Madanpur (Aug) 22066 HVPNL 100
17 Gurgaon Sec-52A (Aug) 22066 HVPNL 160
18 IA Hisar (Aug) 220132 HVPNL 50
19 Narwana (Aug) 220132 HVPNL 60
20 Therubali (3rd Auto TF) 220132 OPTCL 160
21 Halasar ss 220132 RVPNL 160
22 Bansi Siddaharthnagar (Aug) TF-I 220132 UPPTCL 60
23 Hata Kushinagar (New) TF-I 220132 UPPTCL 100
24 Gomti nagar Lucknow (Aug) TF-IV 22033 UPPTCL 60
25 Kanpur Road Lucknow (New) TF-III 22033 UPPTCL 60
26 Asoj (Aug) 22066 GETCO 150
27 Kangasiyali (Aug) 22066 GETCO 60
28 Karmsad (Aug) 22066 GETCO 160
29 Lalpar (Aug) 22066 GETCO 60
TOTAL STATE SECTOR 5340
GRAND TOTAL 9840
21(2)
PRIVATE SECTOR
CENTRAL SECTOR
STATE SECTOR
2Sub-Stations (220 kV and above) CommissionedReady for commissioning During Oct-2018
Name of Sub StationsExecuting
Agency
File NoCEA-CH-14-1142018-Coordination Division
SN Contents Page
1 Electricity Generation (MU) Targets and Achievements for 2018-19 22
Section E - Electricity Generation
File NoCEA-CH-14-1142018-Coordination Division
Programme Achievement Ach Programme Achievement Ach
Central Sector 35160700 3028100 3162321 10443 20144400 21150469 10499
State Sector 35132000 3010000 3017260 10024 19922100 19549030 9813
PvtIPP Sector 36999700 3240600 3375603 10417 21598300 20794155 9628
PvtUTL Sector 1857600 164500 180597 10979 1130900 1203107 10638
Total 109150000 9443200 9735781 10310 62795700 62696761 9984
Central Sector 5617600 420900 451004 10715 4193000 4045436 9648
State Sector 6110600 559500 708469 12663 4049400 4433000 10947
PvtIPP Sector 1141800 80500 90122 11195 976400 1021963 10467
PvtUTL Sector 130000 11300 12564 11119 76700 99943 13030
Total 13000000 1072200 1262159 11772 9295500 9600342 10328
Central Sector 3850000 353300 303310 8585 2068900 2203540 10651
Total 3850000 353300 303310 8585 2068900 2203540 10651
Bhutan Import 500000 63300 35395 5592 347000 416660 12007
Central Sector 44628300 3802300 3916635 10301 26406300 27399445 10376
State Sector 41242600 3569500 3725729 10438 23971500 23982030 10004
Pvt Sector 40129100 3496900 3658886 10463 23782300 23119168 9721
Total 126500000 10932000 11336645 10370 74507100 74917303 10055
Provisional based on actual-cum-Assesment
Figs in MU
Cummulative
Achievement
Cummulative
Achievement
Sep-18 Sep-17 Upto Sep-2018 Upto Sep-2017
1073794 748889 7332680 5660929
22
Renewable Energy Generation
Achievement
Oct-2018
1 Electricity Generation (MU) Targets and Achievememts for 2018-19
All India Energy Generation During April 2018- Oct 2018 (MU)
Target (2018-19)April 2018- Oct 2018
Sector
Hydro
Thermal
Nuclear
627957
92955
20689
745071
626968
96003
22035
749173
0
100000
200000
300000
400000
500000
600000
700000
800000
Thermal Hydro Nuclear Total
Programme
Achievement
File NoCEA-CH-14-1142018-Coordination Division
SN Contents Page
1 Energy Power Supply Position (Provisional) for Oct-2018 and during April 2018- Oct 2018 23
2 Peak Power Supply Position (Provisional) for Oct-2018 and during April 2018- Oct 2018 24
3 Energy Power Supply Position (Revised) for Sep-2018 and during April 2018- Sept 2018 25
4 Peak Power Supply Position (Revised) for Sep-2018 and during April 2018- Sept 2018 26
5 Notified Power cuts Restrictions on Industries during Oct-2018 27
6 Power Supply to Agricultural Sector during Oct-2018 28
Section F - Power supply position
File NoCEA-CH-14-1142018-Coordination Division
आकड़ मममलयन यननट नट Figures in MU net
ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied
कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )
चडीगढ़ Chandigarh 108 108 0 00 1055 1055 0 00
दिलली Delhi 2490 2489 1 00 22524 22510 14 01
हरियजणज Haryana 4554 4554 0 00 35205 35205 0 00
दहमजचल परिश Himachal Pradesh 788 787 2 02 5728 5560 168 29
रमम कशमीि Jammu amp Kashmir 1497 1219 278 186 10982 8865 2117 193
परजब Punjab 4418 4418 0 00 38832 38819 13 00
िजरसथजन Rajasthan 6748 6748 0 00 45341 45181 160 04
उतति परिश Uttar Pradesh 10136 9973 164 16 75485 74808 676 09
उततिजखड Uttarakhand 1083 1081 3 03 8395 8310 85 10
उततरी कषतर Northern Region 31822 31375 447 14 243547 240314 3233 13
छततीसगढ़ Chhattisgarh 2454 2453 1 00 16119 16091 28 02
गरिजत Gujarat 11636 11636 0 00 70782 70768 14 00
मधय परिश Madhya Pradesh 5860 5859 1 00 38412 38410 2 00
महजिजषटर Maharashtra 15223 15095 128 08 95489 95355 134 01
िमन औि दिउ Daman amp Diu 216 216 0 00 1523 1523 0 00
िजिि व नगि हवली Dadra amp Nagar Haveli 553 553 0 00 3757 3757 0 00
गोवज Goa 366 366 0 00 2497 2495 2 01
पशचिमी कषतर Western Region 36308 36178 130 04 228579 228398 180 01
आनधर परिश Andhra Pradesh 5860 5854 6 01 37377 37334 43 01
तलगजनज Telangana 6748 6742 6 01 38251 38205 46 01
कनजाटक Karnataka 5842 5835 7 01 39111 39059 52 01
किल Kerala 2116 2096 20 09 14256 14160 96 07
तममल नजड Tamil Nadu 8611 8601 10 01 65742 65666 76 01
पडचिी Puducherry 216 215 1 05 1654 1646 8 05
लकष-दवीप Lakshadweep 4 4 0 0 27 27 0 0
दकषकषणी कषतर Southern Region 29392 29342 50 02 196390 196069 321 02
बबहजि Bihar 2742 2738 4 01 19143 18951 192 10
िजमोिि घजटी ननगम DVC 1712 1698 13 08 13096 12828 268 20
झजिखणड Jharkhand 701 697 4 06 5022 4949 73 15
ओडडशज Odisha 3147 3134 13 04 20224 20192 32 02
पशशचम बगजल West Bengal 4204 4200 4 01 33008 32881 127 04
मसशककम Sikkim 40 40 0 00 279 279 0 01
अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 67 202 188 13 67
परवी कषतर Eastern Region 12547 12507 40 03 90772 90080 692 08
अरणजचल परिश Arunachal Pradesh 67 66 1 09 502 496 7 13
असम Assam 833 809 24 29 6153 5903 250 41
मणणपि Manipur 72 71 1 10 485 478 7 14
मघजलय Meghalaya 147 147 0 00 1043 1042 0 00
ममज़ोिम Mizoram 63 62 1 08 365 359 5 14
नजगजलड Nagaland 76 67 8 110 540 481 59 109
बिपिज Tripura 130 129 1 09 1025 1007 19 18
उततर-परवी कषतर North-Eastern Region 1387 1351 35 25 10113 9766 346 34
समपणण भारत All India 111455 110753 702 06 769399 764627 4773 06
23
ऊराण वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Energy Power Supply Position Report (Provisional)
राजयStateअकरबर2018 October2018 अपरल2018 -अकरबर2018 April2018 to October2018
ऊरजा पनत ा म कमी ऊरजा पनत ा म कमीEnergy not Supplied
Excludes energy exported to Bangladesh
Energy not Supplied
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
File NoCEA-CH-14-1142018-Coordination Division
अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met
कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )
चडीगढ़ Chandigarh 217 217 0 00 369 369 0 00
दिलली Delhi 4713 4713 0 00 7016 7016 0 00
हरियजणज Haryana 7948 7948 0 00 10270 10270 0 00
दहमजचल परिश Himachal Pradesh 1520 1520 0 00 1520 1520 0 00
रमम कशमीि Jammu amp Kashmir 2836 2269 567 200 2951 2361 590 200
परजब Punjab 7979 7979 0 00 12638 12638 0 00
िजरसथजन Rajasthan 11450 11450 0 00 11698 11698 0 00
उतति परिश Uttar Pradesh 17434 16745 688 39 20498 20062 436 21
उततिजखड Uttarakhand 1943 1943 0 00 2143 2143 0 00
उततरी कषतर Northern Region 50659 49635 1024 20 63166 61726 1440 23
छततीसगढ़ Chhattisgarh 4414 4268 146 33 4414 4268 146 33
गरिजत Gujarat 18148 18130 19 01 18148 18130 19 01
मधय परिश Madhya Pradesh 11356 11317 39 03 11356 11317 39 03
महजिजषटर Maharashtra 23864 23159 705 30 23864 23254 610 26
िमन औि दिउ Daman amp Diu 342 341 1 02 357 356 1 02
िजिि व नगि हवली Dadra amp Nagar Haveli 784 780 4 05 816 815 1 01
गोवज Goa 536 536 0 00 596 596 0 00
पशचिमी कषतर Western Region 56548 55695 853 15 56548 55695 853 15
आनधर परिश Andhra Pradesh 9435 9435 0 00 9435 9435 0 00
तलगजनज Telangana 10603 10603 0 00 10815 10815 0 00
कनजाटक Karnataka 10741 10741 0 00 10741 10741 0 00
किल Kerala 3727 3644 83 22 4050 3997 53 13
तममल नजड Tamil Nadu 14747 14333 414 28 15029 14981 47 03
पडचिी Puducherry 363 362 1 03 420 400 19 46
लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0
दकषकषणी कषतर Southern Region 45279 45226 53 01 45946 45684 262 06
बबहजि Bihar 4945 4945 0 00 5050 5045 5 01
िजमोिि घजटी ननगम DVC 2729 2729 0 00 2874 2874 0 00
झजिखणड Jharkhand 1260 1260 0 00 1339 1284 55 41
ओडडशज Odisha 5624 5224 400 71 5624 5357 268 48
पशशचम बगजल West Bengal 8775 8775 0 00 9130 9123 7 01
मसशककम Sikkim 86 86 0 00 90 90 0 00
अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7
परवी कषतर Eastern Region 22959 22567 392 17 22959 22567 392 17
अरणजचल परिश Arunachal Pradesh 138 125 13 94 138 133 5 37
असम Assam 1785 1704 81 45 1865 1809 56 30
मणणपि Manipur 187 185 2 11 193 186 7 36
मघजलय Meghalaya 336 336 0 00 371 368 2 07
ममज़ोिम Mizoram 99 97 2 20 103 98 4 41
नजगजलड Nagaland 134 131 3 22 156 138 18 117
बिपिज Tripura 269 269 0 00 298 293 5 17
उततर-परवी कषतर North-Eastern Region 2790 2700 90 32 2967 2850 117 39
समपणण भारत All India 172945 170604 2341 14 177022 175528 1494 08
24
अधिकतम वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Peak Power Supply Position Report (Provisional)
आकड़ मगज वजट नट Figures in MW netअपरल2018 -अकरबर2018 April2018 to October2018
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
मजग की पनता म कमी Demand not Met
Excludes the supply to Bangladesh
राजयStateअकरबर2018 October2018
मजग की पनता म कमी Demand not Met
File NoCEA-CH-14-1142018-Coordination Division
आकड़ मममलयन यननट नट Figures in MU net
ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied
कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )
चडीगढ़ Chandigarh 141 141 0 00 947 947 0 00
दिलली Delhi 2925 2924 1 00 20034 20021 13 01
हरियजणज Haryana 4794 4794 0 00 30651 30651 0 00
दहमजचल परिश Himachal Pradesh 876 853 24 27 4940 4773 167 34
रमम कशमीि Jammu amp Kashmir 1520 1246 274 180 9485 7646 1839 194
परजब Punjab 5575 5575 0 00 34414 34401 13 00
िजरसथजन Rajasthan 6202 6201 0 00 38594 38434 160 04
उतति परिश Uttar Pradesh 10211 10124 86 08 65349 64836 513 08
उततिजखड Uttarakhand 1162 1149 13 11 7311 7229 82 11
उततरी कषतर Northern Region 33405 33008 398 12 211725 208939 2786 13
छततीसगढ़ Chhattisgarh 2403 2388 15 06 13665 13638 27 02
गरिजत Gujarat 10122 10122 0 00 59146 59132 14 00
मधय परिश Madhya Pradesh 5492 5491 1 00 32552 32551 1 00
महजिजषटर Maharashtra 13615 13612 3 00 80266 80260 6 00
िमन औि दिउ Daman amp Diu 221 221 0 00 1306 1306 0 00
िजिि व नगि हवली Dadra amp Nagar Haveli 551 551 0 00 3204 3204 0 00
गोवज Goa 339 339 0 00 2131 2128 2 01
पशचिमी कषतर Western Region 32742 32723 19 01 192270 192220 50 00
आनधर परिश Andhra Pradesh 5294 5287 7 01 31518 31480 37 01
तलगजनज Telangana 6279 6272 8 01 31503 31463 40 01
कनजाटक Karnataka 5701 5693 8 01 33269 33225 45 01
किल Kerala 2050 2026 24 12 12140 12063 76 06
तममल नजड Tamil Nadu 8971 8959 12 01 57131 57065 66 01
पडचिी Puducherry 226 224 2 08 1438 1431 7 05
लकष-दवीप Lakshadweep 4 4 0 0 23 23 0 0
दकषकषणी कषतर Southern Region 28520 28460 60 02 166998 166727 271 02
बबहजि Bihar 2839 2793 46 16 16400 16213 188 11
िजमोिि घजटी ननगम DVC 1901 1750 151 79 11384 11130 254 22
झजिखणड Jharkhand 740 723 17 22 4321 4252 69 16
ओडडशज Odisha 2921 2918 3 01 17077 17058 19 01
पशशचम बगजल West Bengal 4902 4879 23 05 28804 28681 123 04
मसशककम Sikkim 39 39 0 01 239 239 0 01
अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 67 173 162 12 67
परवी कषतर Eastern Region 13341 13102 240 18 78225 77573 652 08
अरणजचल परिश Arunachal Pradesh 74 73 1 10 435 429 6 14
असम Assam 950 914 36 38 5320 5094 226 43
मणणपि Manipur 70 69 1 11 414 408 6 15
मघजलय Meghalaya 150 150 0 01 896 896 0 01
ममज़ोिम Mizoram 58 57 1 12 302 297 5 16
नजगजलड Nagaland 80 72 8 104 464 414 50 108
बिपिज Tripura 192 191 1 07 895 878 17 19
उततर-परवी कषतर North-Eastern Region 1575 1527 48 31 8726 8415 311 36
समपणण भारत All India 109584 108819 765 07 657944 653873 4071 06
Energy not Supplied Energy not Supplied
ससतबर2018 September2018 अपरल2018 -ससतबर2018 April2018 to September2018
ऊरजा पनत ा म कमी ऊरजा पनत ा म कमी
Excludes energy exported to Bangladesh
राजयState
ऊराण वरवदयत आपरतण शथिरत ररपोरण (सशोधित) Energy Power Supply Position Report (Revised)
25
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
File NoCEA-CH-14-1142018-Coordination Division
अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met
कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )
चडीगढ़ Chandigarh 293 293 0 00 369 369 0 00
दिलली Delhi 5358 5358 0 00 7016 7016 0 00
हरियजणज Haryana 9008 9008 0 00 10270 10270 0 00
दहमजचल परिश Himachal Pradesh 1466 1466 0 00 1479 1479 0 00
रमम कशमीि Jammu amp Kashmir 2951 2361 590 200 2951 2361 590 200
परजब Punjab 11405 11405 0 00 12638 12638 0 00
िजरसथजन Rajasthan 10612 10612 0 00 11698 11698 0 00
उतति परिश Uttar Pradesh 18346 18121 225 12 20498 20062 436 21
उततिजखड Uttarakhand 1996 1996 0 00 2143 2143 0 00
उततरी कषतर Northern Region 56407 55649 758 13 63166 61726 1440 23
छततीसगढ़ Chhattisgarh 4404 4075 328 75 4404 4136 268 61
गरिजत Gujarat 16963 16963 0 00 17053 16963 90 05
मधय परिश Madhya Pradesh 8811 8771 41 05 8811 8775 36 04
महजिजषटर Maharashtra 22455 22349 106 05 23395 23254 141 06
िमन औि दिउ Daman amp Diu 357 356 1 02 357 356 1 02
िजिि व नगि हवली Dadra amp Nagar Haveli 816 815 1 01 816 815 1 01
गोवज Goa 596 596 0 00 596 596 0 00
पशचिमी कषतर Western Region 52933 52895 38 01 53841 52895 945 18
आनधर परिश Andhra Pradesh 9435 9416 19 02 9435 9416 19 02
तलगजनज Telangana 10815 10815 0 00 10815 10815 0 00
कनजाटक Karnataka 10103 10090 13 01 10690 10688 2 00
किल Kerala 3888 3638 251 64 4050 3997 53 13
तममल नजड Tamil Nadu 14556 14553 3 00 15029 14981 47 03
पडचिी Puducherry 390 372 17 45 420 400 19 46
लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0
दकषकषणी कषतर Southern Region 45542 45428 114 02 45946 45684 262 06
बबहजि Bihar 5050 5045 5 01 5050 5045 5 01
िजमोिि घजटी ननगम DVC 2641 2641 0 00 2874 2874 0 00
झजिखणड Jharkhand 1233 1233 0 00 1339 1284 55 41
ओडडशज Odisha 4906 4906 0 00 5357 5357 0 00
पशशचम बगजल West Bengal 8644 8639 5 01 9130 9123 7 01
मसशककम Sikkim 78 78 0 00 90 90 0 00
अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7
परवी कषतर Eastern Region 22110 22100 10 00 22470 22290 180 08
अरणजचल परिश Arunachal Pradesh 132 130 2 15 138 133 5 37
असम Assam 1865 1809 56 30 1865 1809 56 30
मणणपि Manipur 184 182 2 13 193 186 7 36
मघजलय Meghalaya 317 317 0 00 371 368 2 07
ममज़ोिम Mizoram 95 93 2 23 103 98 4 41
नजगजलड Nagaland 142 138 5 32 156 138 18 117
बिपिज Tripura 296 293 3 10 298 293 5 17
उततर-परवी कषतर North-Eastern Region 2921 2850 71 24 2967 2850 117 39
समपणण भारत All India 177022 175528 1494 08 177022 175528 1494 08
26
मजग की पनता म कमी मजग की पनता म कमी Demand not MetDemand not Met
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
Excludes the supply to Bangladesh
अधिकतम वरवदयत आपरतण शथिरत ररपोरण (सशोधित) Peak Power Supply Position Report (Revised)
आकड़ मगज वजट नट Figures in MW net
राजयStateससतबर2018 September2018 अपरल2018 -ससतबर2018 April2018 to September2018
File NoCEA-CH-14-1142018-Coordination Division
अकरबर2018 October2018अपरल2018 -अकरबर2018 April2018 to October2018
उततरी कषतर Northern Region
चडीगढ़ Chandigarh Data not received Data not received
दिलली Delhi
हरियजणज Haryana
दहमजचल परिश Himachal Pradesh
रमम कशमीि Jammu amp Kashmir Data not received Data not received
परजब Punjab
िजरसथजन Rajasthanउतति परिश Uttar Pradesh
उततिजखड Uttarakhand
पशचिमी कषतर Western Region
छततीसगढ़ Chhattisgarh
गरिजत Gujarat
मधय परिश Madhya Pradesh
महजिजषटर Maharashtra
गोवज Goa
दकषकषणी कषतर Southern Region
आनधर परिश Andhra Pradesh
तलगजनज Telangana
कनजाटक Karnataka
किल Kerala
तममल नजड Tamil Nadu
पडचिी Puducherryपरवी कषतर Eastern Region
बबहजि Bihar
झजिखणड Jharkhand
ओडडशज Odisha
पशशचम बगजल West Bengal
N
o No
tified
Cuts
N
o No
tified
Cuts
27
अकरबर 2018 म इडथरीर पर वरवदयत करौती का वरवरवरण Notified Power CutsRestrictions on Industries during October2018
राजय कषतर State Regionऊराणमाग करौती EnergyDemand Cut
No Notified Cuts No Notified Cuts
File NoCEA-CH-14-1142018-Coordination Division
अकरबर2018 October2018अपरल2018 -अकरबर2018 April2018 to October2018
उततरी कषतर Northern Region
चडीगढ़ Chandigarh Data not received Data not received
दिलली Delhi Data not received Data not received
हरियजणज Haryana 940 hrsday 0709 - 0950 hrsday
दहमजचल परिश Himachal Pradesh No cut imposed on agriculture consumers and uninterrupted
power is being supplied to agriculture sector
HPSEBL has only 2 agriculture consumers and uninterrupted
power is being supplied to agriculture sector
रमम कशमीि Jammu amp Kashmir Data not received Data not received
परजब Punjab 0507 hrsday 0349 - 0844 hrsday
िजरसथजन Rajasthan 0630 hrsday 0630 hrsday
उतति परिश Uttar Pradesh 1825 hrsday 1814 - 1858 hrsday
उततिजखड Uttarakhand 2350 hrsday 2128 - 2357 hrsday
पशचिमी कषतर Western Region
छततीसगढ़ Chhattisgarh 18hoursday 18 hrsday
गरिजत Gujarat 805 hrsday 805 hrsday
मधय परिश Madhya Pradesh Three-Phase Supply(Irrigation)-947 hrs day
Three-Phase (Mixed) Supply - 2311 hrs day
Three-Phase Supply(Irrigation)- 0933 - 0947 hrs day Three-
Phase (Mixed) Supply - 2300 - 2320 hrs day
महजिजषटर Maharashtra Three-Phase Supply(Irrigation)- 9 hrs day
Three-Phase (Mixed) Supply - 24 hrs day
Three-Phase Supply(Irrigation)- 9 hrs day
Three-Phase (Mixed) Supply - 24 hrs day
गोवज Goa No restriction No restriction
दकषकषणी कषतर Southern Region
आनधर परिश Andhra Pradesh 07 hrsday 07 hrsday
तलगजनज Telangana 24 hoursday 24 hoursday
कनजाटक Karnataka 6 hrsday 6 hrsday
किल Kerala No Restrictions No Restrictions
तममल नजड Tamil Nadu 9 hrsday (6 hrs during day time and 3 hrs during night time) 9 hrsday (6 hrs during day time and 3 hrs during night time)
पडचिी Puducherry No Restrictions No Restrictions
परवी कषतर Eastern Region
बबहजि Bihar About 18 hrsday About 18 hrsday
झजिखणड Jharkhand About 20 hrsday About 20 hrsday
ओडडशज Odisha 24 hrsday 24 hrsday
पशशचम बगजल West Bengal About 23 hrsday About 23 hrsday
28
अकटबर 2018 कषि कषतर को षिदयत आपरति का षििरण Power Supply to Agricultural Sector during October2018
राजय कषतर State Regionऔसत वरवदयत आपरतण घनरो म Average Hours of Supply
On segregated feeders
File NoCEA-CH-14-1142018-Coordination Division
SNo Contents Page
1 Growth of Installed Capacity since 6th Plan 29
2 Progress of Transmission Sector since 6th Plan 30
3 All India Yearly Coal consumption for Power Generation (Utilities)
4 All India Annual Per Capita Consumption of Electricity since -2006
5 Average cost of power supply amp Average realisation (Paisakwh)
6 Growth of Rural Electrification amp Pump Sets Energisation
7 Status of Hydro Schemes Cleared by the CEA in Oct-2018
Section G - Growth of Power Sector
31
32
File NoCEA-CH-14-1142018-Coordination Division
(In MW)
Coal Gas Diesel Total
End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472
End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634
End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537
End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596
End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921
End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703
End of 12th Plan 19216288 2532938 83763 21832988 6780 4447842 50018 31960630
Up to Oct-2018 19599250 2493722 837629 22176734 6780 4548742 7201281 34604757
Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-17) = 51529 MW
Electricity Generation (MU) Targets and Achievements for 2016-17
Coal Gas Diesel Nuclear Hydro Res Total
1959925 2493722 837629 678000 454874 72012805 22925174
29
1 Growth of Installed Capacity Since 6th Plan
Plan YearThermal
Nuclear Hydro RES (MNRE) Total
Total Installed Capacity 34604757 MW
Coal Gas Diesel Nuclear Hydro Res
File NoCEA-CH-14-1142018-Coordination Division
Progress of Transmission Sector in the Country up to Oct 2018
1 TRANSMISSION LINES (All fig in CKM)
At the end of
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
6th plan 0 0 0 0 0 0 0 0 0 0 0 0 1831 4198 0 6029 1641 44364 0 46005 3472 48562 0 52034
7th plan 0 0 0 0 0 0 0 0 0 0 0 0 13068 6756 0 19824 4560 55071 0 59631 17628 61827 0 79455
8th plan 0 0 0 0 1634 0 0 1634 0 0 0 0 23001 13141 0 36142 6564 73036 0 79600 31199 86177 0 117376
9th plan 0 0 0 0 3234 1504 0 4738 751 409 0 1160 29345 20033 0 49378 8687 88306 0 96993 42017 110252 0 152269
10th plan 0 0 0 0 4368 1504 0 5872 1775 409 0 2184 48708 24730 0 73438 9444 105185 0 114629 64295 131828 0 196123
11th Plan 0 0 0 0 5948 1504 1980 9432 4839 411 0 5250 71023 30191 5605 106819 10140 125010 830 135980 91950 157116 8415 257481
12th Plan 6124 0 0 6124 5948 1504 1980 9432 25465 1177 4598 31240 92482 48240 17065 157787 11014 151276 978 163268 141033 202197 24621 367851
13th Plan (Up
to Mar2018)6124 0 0 6124 5948 1504 1980 9432 28666 1512 4881 35059 98247 54286 19067 171600 11258 156497 1000 168755 150243 213799 26928 390970
13th Plan (Up
to Sep-18)6124 0 0 6124 5948 1504 1980 9432 30952 1512 5059 37523 99683 56069 20662 176414 11318 160958 1000 173276 154025 220043 28701 402769
27150
75050
47900
118050
90650
30
IR addition in 12th Plan (up to
March 2017)
Total IR (up to Oct-18)
IR at the end of 11th Plan
IR at the end of 12th Plan
Envisaged IR Capacity at the end
of 13th Plan
Grand Total
Note - The figure upto the end of 10th plan in for stringing progress including the lines not commissioned Now only commissioned lines are reckoned Accordingly the figure for 10th plan (end) may read as 187555 after adjusting with (-) 10852 Ckm
Inter-regional Power Transfer Capacity
plusmn 800 kV HVDC plusmn 500 kV HVDC 765 kV 400 kV 220 kV
File NoCEA-CH-14-1142018-Coordination Division
2004-05 27800
2005-06 28100
2006-07 30200
2007-08 33000
2008-09 35500
2009-10 36700
2010-11 38700
2011-12 41756
2012-13 45460
2013-14 48940
2014-15 53040
2015-16 54590
2016-17 57430
2017-18 60800
Year
2005-06
2006-07
2007-08
2008-09
2009-10
2010-11
2011-12
2012-13
2013-14
2014-15
2015-16
2016-17
2017-18
2004-05 254 209 7568
2005-06 260 221 7636
2006-07 276 227 7423
2007-08 293 239 7727
2008-09 340 263 8713
2009-10 355 268 8870
2010-11 398 303 11975
2011-12 455 330 13514
2012-13 501 376 14867
2013-14 518 175
2014-15 520
6719
7171
3 All India yearly Coal Consumption for Power Generation (Utilities)
YEARCoal Consumption
Million Tonnes
4 All India Annual per Capita consumption of Electricity Since 2006
Per Capita Consumption ( kWh)
6314
(GrossGen+ Net Import) Mid-year population
5 Average cost of power supply amp average realization ( paiseKWH )
Yearcost of supply
(paiseunit)
Realization(paiseunit)
Including AgricultureOnly
Agriculture
1149
7335
7786
91441
8188
88363
957
1010
1075
1122
File NoCEA-CH-14-1142018-Coordination Division
Source- PFC Reports on the performance of State Power Utilities 31
File NoCEA-CH-14-1142018-Coordination Division
Sl
NoExecuting Agency
Installed
Capacity (MW)Cost (Rs crore)
Date of
Clearance
32
No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification
since 2004-05
65291374575 296361511th Plan
Cumu upto End of 11th Plan
596556 21212860
557439Cummulative up to end of 12th Plan
46708
18423975
499150
2003-042004-05
5743
9769
Cumu upto End of 10th Plan
010407 to 310308
010410 to 310311557976840909
010411 to 310312
412667
86293726
3207
482864
12632
1576036
4451722594
15455554
2314176
397343611750
2093311060316074
65109527813884
6 Growth Of Rural Electrification amp Pumpsets Energisation
Plan Year
9th Plan2002-03
134092626
4111
Pump Sets Energised Villages Electricfied (Nos)
2001-02
284064367244
1218
27801997-981998-991999-002000-01
297594
010408 to 310309010409 to 310310
10th Plan
2005-062006-07
322968331020
Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as
Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received
from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made
available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified
villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is
independent of the earlier published reports
No Hydro Electric Project has been issued concurrenceAppraisal letter by CEA during October 2018
7 Status of Hydro Schemes Cleared by the CEA in Oct-2018
Name of Scheme
File NoCEA-CH-14-1142018-Coordination Division
SN Contents Page
1 Rate of sale of power for the year 2016-17 33-41
RATE OF SALE OF POWER FOR THE YEAR 2016-17
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) NORTHERN REGION
CENTRAL SECTOR
BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 18000 66900 19800
CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 54000 222400 21600
CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 30000 144400 19600
CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 23100 91700 42600
PARBATI - III HPS NHPC LTD HYDRO-HYDRO 52000 68200 54800
DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 28000 95600 30000
CHUTAK NHPC LTD HYDRO-HYDRO 4400 22000 79800
DULHASTI HPS NHPC LTD HYDRO-HYDRO 39000 228000 56400
SALAL HPS NHPC LTD HYDRO-HYDRO 69000 342300 11000
TANAKPUR HPS NHPC LTD HYDRO-HYDRO 9420 43000 29600
URI HPS -I NHPC LTD HYDRO-HYDRO 48000 280300 16000
URI HPS - II NHPC LTD HYDRO-HYDRO 24000 147300 48600
NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 4500 24600 88200
SEWA - II NHPC LTD HYDRO-HYDRO 12000 47100 43400
ANTA CCPP NTPC LTD THERMAL-GASN 41930 67539 32400
AURAIYA CCPP NTPC LTD THERMAL-GASN 66336 53501 39100
BADARPUR TPS NTPC LTD THERMAL-COAL 70500 159153 44800
DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 84000 296170 42300
DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 98000 526686 46300
DADRI CCPP NTPC LTD THERMAL-GASHSD 82978 227469 33000
FARIDABAD CCPP NTPC LTD THERMAL-GASN 43159 115577 30800
RIHAND STPS I NTPC LTD THERMAL-COAL 100000 596766 24500
RIHAND STPS II NTPC LTD THERMAL-COAL 100000 737069 24600
RIHAND STPS III NTPC LTD THERMAL-COAL 100000 706546 30600
SINGRAULI STPS NTPC LTD THERMAL-COAL 200000 1394068 20400
TANDA TPS NTPC LTD THERMAL-COAL 44000 295438 40800
UNCHAHAR TPS I NTPC LTD THERMAL-COAL 42000 256454 39800
UNCHAHAR TPS II NTPC LTD THERMAL-COAL 42000 273577 38900
UNCHAHAR TPS III NTPC LTD THERMAL-COAL 21000 142780 43000
KOLDAM NTPC LTD HYDRO-HYDRO 80000 363260 43600
NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 303575 25841
RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 108000 668677 35374
NJHPS SJVNL HYDRO-HYDRO 150000 699496 23820
RAMPUR HPS SJVNL HYDRO-HYDRO 41202 195982 32260
TEHRI HPP THDC HYDRO-HYDRO 100000 272543 51800
KOTESHWAR HEP THDC HYDRO-HYDRO 40000 106244 53400
IGSTPS JHAJJAR ARAVALI P CPL THERMAL-COAL 150000 510429 49490
NEYVELI BARSINGSAR NEYVELI LIG CORP LTD THERMAL-LIG 25000 127520 38040
STATE SECTOR
PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 21000 14222 48200
PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 21000 19205 48400
PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 25000 102257 42600
PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 25000 62107 41800
DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 60000 312213 41000
RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 120000 35767442200
WYC HYDEL STATION HPGCL HYDRO-HYDRO 6240 20365 24900
GIRI POWER HOUSE HPSEB HYDRO-HYDRO 6000 13958 7600
ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 1695 5467 11900
BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 12000 18528 6700
GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 2250 7462 22500
BASSI POWER HOUSE HPSEB HYDRO-HYDRO 6600 29649 7500
BINWA POWER HOUSE HPSEB HYDRO-HYDRO 600 2749 19300
ANNEXURE-I
RATE OF SALE OF POWER FOR THE YEAR 2016-2017
Page 33
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) GAJ POWER HOUSE HPSEB HYDRO-HYDRO 1050 2914 26700
BANER POWER HOUSE HPSEB HYDRO-HYDRO 1200 2864 16200
HOLI POWER HOUSE HPSEB HYDRO-HYDRO 300 616 22500
THIROT POWER HOUSE HPSEB HYDRO-HYDRO 450 1126 22500
KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 1200 3064 22500
LARJI POWER HOUSE HPSEB HYDRO-HYDRO 12600 53677 23700
NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 250 750 31000
CHABA POWER HOUSE HPSEB HYDRO-HYDRO 175 465 23300
RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 150 101 13400
SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 200 000 22500
KILLAR HPSEB HYDRO-HYDRO 030 050 22500
BHABA AUGUMENP H HPSEB HYDRO-HYDRO 450 1276 22500
BS CHAMBA HPSEB HYDRO-HYDRO 045 099 19500
GUMMA HPSEB HYDRO-HYDRO 300 423 22500
GAS TURBINE POWER STATION IPGCL THERMAL-GAS 27000 67233 39300
PPS-I PPCL THERMAL-GAS 33000 175905 38300
PPS-III PPCL THERMAL-GAS 137120 196879 36100
LOWER JHELUM JampKPDD HYDRO-HYDRO 10500 60214 5100
UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 2260 10514 6300
UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 10500 44202 8500
GANDHARBAL JampKPDD HYDRO-HYDRO 1500 8925 4700
KARNAH MPH JampKPDD HYDRO-HYDRO 200 1122 31000
CHENANI I JampKPDD HYDRO-HYDRO 2330 10892 6600
CHENANI II JampKPDD HYDRO-HYDRO 200 1188 9300
CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 750 3634 14200
IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 375 2108 18500
IGO MERCHELLONG JampKPDD HYDRO-HYDRO 300 1572 29700
PAHALGAM MHP JampKPDD HYDRO-HYDRO 450 1713 32900
MARPACHOO JampKPDD HYDRO-HYDRO 075 375 29800
HAFTAL JampKPDD HYDRO-HYDRO 100 483 28700
SANJAK JampKPDD HYDRO-HYDRO 126 441 36000
SEWA-III JampKPDD HYDRO-HYDRO 900 3273 20200
BHADERWAH JampKPDD HYDRO-HYDRO 150 935 8900
BAZGO JampKPDD HYDRO-HYDRO 030 108 33300
SUMOOR JampKPDD HYDRO-HYDRO 010 045 35400
HUNDER JampKPDD HYDRO-HYDRO 040 176 26200
STAKNA JampKPDD HYDRO-HYDRO 400 1933 4100
KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 124000 662879 31360
SURATGARH TPS RRVUNL THERMAL-COAL 150000 402328 41730
CHHABRA TPS 1amp 2 RRVUNL THERMAL-COAL 50000 305946 36700
CHHABRA TPS 3 RRVUNL THERMAL-COAL 25000 151536 36700
CHHABRA TPS 4 RRVUNL THERMAL-COAL 25000 155896 36700
RAMGARH GT POWER PROJECT RRVUNL THERMAL-COAL 22050 43177 41800
RAMGARH GAS T P PROJECT 3 RRVUNL THERMAL-GAS 5000 93615 41800
DHOLPUR C C POWER PROJECT RRVUNL THERMAL-R-LNG 33000 9486 46110
MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 14000 20855 34192
MINI MICRO HYDEL (MMH) P S RRVUNL HYDRO-HYDRO 2385 851 37800
KALISINDH TPP 1 RRVUNL THERMAL-COAL 60000 341543 45000
KALISINDH TPP 2 RRVUNL THERMAL-COAL 60000 211588 45000
KHARA HEP UPJVNL HYDRO-HYDRO 7200 26654 7200
MATATILLA HEP UPJVNL HYDRO-HYDRO 3060 12219 6500
OBRA HEP UPJVNL HYDRO-HYDRO 9900 21517 6300
RIHAND UPJVNL HYDRO-HYDRO 30000 57369 5500
ANPARA A TPS UPRVUNL THERMAL-COAL 63000 317536 27000
ANPARA B TPS UPRVUNL THERMAL-COAL 100000 705605 22700
ANPARA D UPRVUNL THERMAL-COAL 100000 300158 39800
HARDUAGANJ TPS UPRVUNL THERMAL-COAL 16500 45817 49200
HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 50000 304389 46600
OBRA A TPS UPRVUNL THERMAL-COAL 28800 13158 34000
OBRA B TPS UPRVUNL THERMAL-COAL 100000 328124 21900
Page 34
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) PANKI TPS UPRVUNL THERMAL-COAL 21000 66488 50300
PARICHHA TPS UPRVUNL THERMAL-COAL 22000 38762 49400
PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 42000 231931 45600
PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 50000 276722 50400
CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 24000 70845 8290
CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 14400 75366 8390
DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 3375 9595 12080
DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 5100 18701 10520
KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4140 17359 12330
KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 12000 33001 9420
KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 3000 11953 8320
TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 9000 33983 12460
MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 30400 124510 16110
RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 19800 17897 10550
MPUR UTTARAKHAND JVNL HYDRO-HYDRO 930 5121 19200
PATHRI UTTARAKHAND JVNL HYDRO-HYDRO 2040 11636 14200
GALOGI UTTARAKHAND JVNL HYDRO-HYDRO 300 648 12500
PRIVATE SECTOR
MGTPP CLP INDIA PVT LTD THERMAL-COAL 132000 268902 41940
SHRINAGAR HEP ALAKNANDA HPCL HYDRO-HYDRO 33000 127414 48800
GAMA INFRAPROP CCPP GAMA INFRAPROP PVT THERMAL-GAS 22500 52686 47000
PPGCL (BARA) JP POWER VENTURES LTD THERMAL-COAL 198000 448200 38500
MALANA HEP MALANA PCL HYDRO-HYDRO 8600 26354 29792
MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 10000 30369 32580
ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 19200 56347 36079
KASHANG HEP H P PCL HYDRO-HYDRO 19500 5034 29200
BASPA-II HEP HBPCL HYDRO-HYDRO 30000 132769 13600
KARCHAM WANGTOO HEP HBPCL HYDRO-HYDRO 100000 434386 36600
RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 108000 582600 43700
RITHALA COMBI CY POWER PLANT TATA POWER DDL THERMAL-GAS 9480 000 11900
RAJPURA TPS NABHA POWER LTD THERMAL-GAS 140000 901484 39000
TALWANDI SABO POWER LTD TALWANDI SABO POWER LTD THERMAL-COAL 198000 636040 49548
ROJA THERMAL POWER STATION ROJA POWER SCL THERMAL-COAL 120000 727200 43400
KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 34400 63400
BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 36000 62600
MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 38200 60800
UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 37900 61500
KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 42300 58800
LALITPUR PGCL BAJAJ ENERGY PVT LTD THERMAL-COAL 198000 359400 47300
PRAYAGRAJ PGCL PRAYAGRAJ PGCL THERMAL-COAL 132000 448200 38595
KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 132000 783182 33438
WESTERN REGION
CENTRAL SECTOR
INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 100000 325333 23892
OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 52000 141663 34001
GANDHAR CCPP NTPC LTD THERMAL-GAS 65739 221924 28700
KAWAS CCPP NTPC LTD THERMAL-GASN 65620 167929 27000
KORBA I amp II NTPC LTD THERMAL-COAL 210000 1499171 20500
KORBA III NTPC LTD THERMAL-COAL 50000 358746 26600
SIPAT STPS I NTPC LTD THERMAL-COAL 198000 1479902 26800
SIPAT STPS II NTPC LTD THERMAL-COAL 100000 766549 26500
VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 126000 693142 25800
VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 100000 608781 23800
VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 100000 673475 27600
VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 100000 655924 32900
VINDHYACHAL STPS V NTPC LTD THERMAL-COAL 50000 328265 31700
MOUDA I NTPC LTD THERMAL-COAL 100000 343130 44500
MOUDA Ii NTPC LTD THERMAL-COAL 66000 40637 39900
RATNAGIRI GAS amp POWER PVT LTD RGPPL THERMAL-GAS 196708 442485 47000
KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 000 24729
TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 32000 201227 10740
Page 35
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 365122 19069
TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 787444 29324
STATE SECTOR
GSEG-HAZIRA15610 MW GUJARAT S ENEGEN LTD THERMAL-GAS 15610 1805 28200
GSEG-HAZIRA35143 MW GUJARAT S ENEGEN LTD THERMAL-GAS 35130 22276 51300
GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 21978 51800
AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 13929 26100
KORBA TPS EAST CSPGCL THERMAL-COAL 44000 198673 33880
DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 365808 27570
KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 316500 30420
HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 532878 19410
CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 515 58300
MTTPS CHAMPA U-I CSPGCL THERMAL-COAL 50000 220376 39000
MTTPS CHAMPA U-II CSPGCL THERMAL-COAL 50000 23709 10000
SHP GANGREL CSPGCL HYDRO-HYDRO 1000 2350 36790
BANGO HEP CSPGCL HYDRO-HYDRO 12000 14662 8900
MHP KORBA WEST CSPGCL HYDRO-HYDRO 170 859 38190
SIKASAR HEP CSPGCL HYDRO-HYDRO 700 418 26870
DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8843 74500
DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 19446 51500
GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 66388 71600
GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127488 41300
KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 96072 43900
KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 29841 56400
SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 184966 58800
UKAI 1-5 GSECL THERMAL-COAL 85000 204891 46900
UKAI TPS 6 GSECL THERMAL-COAL 50000 284448 48200
WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 271999 58300
WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 82808 44100
KADANA HPS GSECL HYDRO-HYDRO 24200 34433 16800
UKAI HPS GSECL HYDRO-HYDRO 30500 40585 6100
TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 123000 11500
BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 8900 10900
BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 7200 27500
JHINNA HPS MPPGCL HYDRO-HYDRO 2000 9700 18500
RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 44300 3400
GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 17300 4600
SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 4100 16900
MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 14600 27000
PENCH HPS MPPGCL HYDRO-HYDRO 16000 23700 8100
RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 3000 16900
AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 134400 35100
SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 283800 38700
SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 344600 34300
SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 111600 61600
SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 211800 58000
SSTPS PH-I MPPGCL THERMAL-COAL 120000 233100 84300
BHUSAWAL TPS MSPGCL THERMAL-COAL 142000 566258 51100
CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1365682 33700
KHAPERKHEDA MSPGCL THERMAL-COAL 134000 706207 39100
KORADI TPS MSPGCL THERMAL-COAL 62000 443206 42000
NASIK TPS MSPGCL THERMAL-COAL 63000 297275 47000
PARLI TPS MSPGCL THERMAL-COAL 113000 175934 71600
PARAS MSPGCL THERMAL-COAL 50000 267931 38700
URAN CCPP MSPGCL THERMAL-GAS 67200 320330 30600
KOYANA MSPGCL HYDRO-HYDRO 195600 328155 13100
SMALL HYDRO POWER PLANTS MSPGCL HYDRO-HYDRO 45400 93062 30500
BHIRA MSPGCL HYDRO-HYDRO 8000 10046 8400
TILLARI MSPGCL HYDRO-HYDRO 8900 10584 3100
SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 233298 20500
SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 87633 20500
PRIVATE SECTOR
Page 36
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 81282 46750
JNSTPP(JAYPEE NIGRIE) JP POWER VENTURES LTD THERMAL-COAL 132000 726695 29310
MB POWER MB POWER THERMAL-COAL 120000 345632 38310
ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 754922 28671
ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 780761 23495
ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 198000 1263784 32090
ADANI POWER MAHARA ADANI POWER LTD THERMAL-COAL 330000 1666191 34124
AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 170065 36827
SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 252035 45129
ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 458551 36000
ESSAR POWER MP LTD ESSAR POWER MP LTD THERMAL-COAL 60000 243040 28600
VEDANTA LTD (P P -I) VEDANTA LTD THERMAL-GAS 3000 15044 24000
VEDANTA LTD (P P -II) VEDANTA LTD THERMAL-GAS 3000 21293 24000
PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 8234600 24000
165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 5850 64390
145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 68717 40349
SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 132655 28776
SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 144686 38567
MUNDRA UMPPCOASTAL GUJARAT POWER
LTD THERMAL-IMP COAL 400000 2530300
23900
LANCO AMARKANTAK TPP PATHADIH
U-ILANCO AMARKAN POWER LTD THERMAL-COAL 30000 195500
29200
LANCO AMARKANTAK TPP PATHADIH
U-IILANCO AMARKAN POWER LTD THERMAL-COAL 30000 206900
27600
BARADARHA TPS D B POWER LTD THERMAL-COAL 120000 677373 29200
JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 405000 28900
JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 453000 40500
DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 339437 40700
TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 293400 44000
TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 137200 37000
TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 174900 44000
BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 92900 14100
BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23700 34300
KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 27600 48300
CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2530300 23900
BHANDARDRA HEP -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 2475 54900
SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 161400 26500
SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 445000 39000
SOTHERN REGION
CENTRAL SECTOR
NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 325699 54820
NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 305532 39880
NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 998805 38510
NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 113016 54070
NEYVELI TAMILNADU POWER LTD JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 625274 42200
VALLUR TPS NTPC TECL THERMAL-COAL 150000 856438 42350
R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 1493 84300
RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1502919 29400
RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 341291 31800
SIMHADRI I NTPC LTD THERMAL-COAL 100000 688382 36800
SIMHADRI II NTPC LTD THERMAL-COAL 100000 663657 43400
KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 593110 31324
MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 291625 21764
KKNPP-1 amp 2 NPCIL NUCLEAR-NUCLEAR 200000 572609 40948
MINICOY LAKSHADEEP THERMAL-DIESEL 340 770 29600
KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1097 29600
AMINI LAKSHADEEP THERMAL-DIESEL 265 509 29600
ANDROTT LAKSHADEEP THERMAL-DIESEL 219 524 29600
KALPENI LAKSHADEEP THERMAL-DIESEL 175 356 29600
AGATTI LAKSHADEEP THERMAL-DIESEL 195 658 29600
KADMAT LAKSHADEEP THERMAL-DIESEL 190 414 29600
KILTAN LAKSHADEEP THERMAL-DIESEL 150 269 29600
CHETLET LAKSHADEEP THERMAL-DIESEL 100 139 29600
BITRA LAKSHADEEP THERMAL-DIESEL 043 024 29600
BANGARAM LAKSHADEEP THERMAL-DIESEL 018 009 29600
Page 37
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) STATE SECTOR
Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 721811 46500
Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 50000 336142 46500
RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 237358 46500
RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 239926 46500
RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 124500 46500
SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 62109 46500
UPPER SILERU APGENCO HYDRO-HYDRO 24000 33000 46500
LOWER SILERU APGENCO HYDRO-HYDRO 46000 81066 46500
DONKARAI APGENCO HYDRO-HYDRO 2500 6007 46500
PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 1262 46500
CHETTIPETA APGENCO HYDRO-HYDRO 100 214 46500
MUCHKUND APGENCO HYDRO-HYDRO 12000 37571 46500
NAGARJUNASAGAR RCPH APGENCO HYDRO-HYDRO 9000 606 46500
TUNGABHADRA HES amp HAMPI(AP
Share)
APGENCO HYDRO-HYDRO 7200 6100 46500
KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 352232 42600
KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 288131 32500
KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 319272 46500
RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 40073 44300
KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 308317 46000
KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 308963 51300
SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 61004 76600
NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 17960 75300
PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 20873 58300
POCHAMPAD-I TSPGENCO HYDRO-HYDRO 2700 5455 29800
POCHAMPAD-II TSPGENCO HYDRO-HYDRO 900 1932 40700
NIZAMSAGAR TSPGENCO HYDRO-HYDRO 1000 1126 53400
RAICHUR TPS 1 to 7 KPCL THERMAL-COAL 147000 890866 43800
RAICHUR TPS 8 KPCL THERMAL-COAL 25000 159523 48200
BELLARI TPS 1 KPCL THERMAL-COAL 50000 318679 51100
BELLARI TPS 2 KPCL THERMAL-COAL 50000 232347 55600
BELLARI TPS 3 KPCL THERMAL-COAL 70000 47565 34400
BHADRA PH KPCL HYDRO-HYDRO 3920 2369 45900
GERUSUPPA PH KPCL HYDRO-HYDRO 24000 26990 22000
GHAT PRABHA HEP KPCL HYDRO-HYDRO 3200 4777 25300
KADRA HPS KPCL HYDRO-HYDRO 15000 16889 26800
NAGJHARI KPCL HYDRO-HYDRO 90000 155159 9800
KODASALLI DPH KPCL HYDRO-HYDRO 12000 14854 19200
MUNIRA+MGH+SPH+SPH KPCL HYDRO-HYDRO 22640 48211 7900
SHARAVATHY HPS KPCL HYDRO-HYDRO 108550 276215 5400
ALMATTI DPH KPCL HYDRO-HYDRO 29000 39611 24600
VARAHI UGPH KPCL HYDRO-HYDRO 46000 71368 15600
IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 17196 15300
IDUKKI HPS KSEB HYDRO-HYDRO 78000 137905 15300
KAKKAD HPS KSEB HYDRO-HYDRO 5000 13063 15300
KALLADA HPS KSEB HYDRO-HYDRO 1500 4436 15300
KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 46544 15300
KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 635 15300
LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 30822 15300
MALANKARA HPS KSEB HYDRO-HYDRO 1050 2474 15300
MATTUPETTY KSEB HYDRO-HYDRO 200 230 15300
MALAMPUZHA KSEB HYDRO-HYDRO 250 063 15300
CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 864 15300
URUMI ST I amp II KSEB HYDRO-HYDRO 615 903 15300
LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 248 15300
NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7765 19625 15300
PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 16601 15300
PANNIAR HPS KSEB HYDRO-HYDRO 3240 6217 15300
PORINGALKUTHU KSEB HYDRO-HYDRO 3600 10052 15300
PORINGALKUTHU LBE KSEB HYDRO-HYDRO 1600 9438 15300
PEPPARA KSEB HYDRO-HYDRO 300 395 15300
POOZHITHODE KSEB HYDRO-HYDRO 480 1045 15300
Page 38
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) PEECHI KSEB HYDRO-HYDRO 125 040 15300
RANI-PERUNADU KSEB HYDRO-HYDRO 400 585 15300
SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 79783 15300
SENGULAM HPS KSEB HYDRO-HYDRO 5120 11558 15300
SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 16711 15300
VILANGAD KSEB HYDRO-HYDRO 750 1578 15300
BARAPOLE KSEB HYDRO-HYDRO 1500 1932 15300
VELLATHOOVAL KSEB HYDRO-HYDRO 360 305 15300
CHIM0NY KSEB HYDRO-HYDRO 250 156 15300
ADYANPARA KSEB HYDRO-HYDRO 350 501 15300
BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 554 15300
KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 3801 15300
KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 23132 32800
ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 14416 62280
METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 523970 62280
METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 321270 62280
NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 336575 62280
NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 591240 62280
TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 508966 62280
KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 30897 62280
VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 18720 90699 62280
KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 33593 62280
BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 1047 62280
PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 1250 62280
PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 330 62280
MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 4897 62280
MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 032 62280
KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15681 62280
KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 40608 62280
KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 21342 62280
KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 4717 62280
KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4322 62280
KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2399 62280
METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 4416 62280
METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 8035 62280
BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2187 62280
BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2359 62280
BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2511 62280
BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 1949 62280
BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 1819 62280
POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 172 62280
SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 241 62280
MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 026 62280
THIRUMOORTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 136 62280
PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 9309 62280
VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 353 62280
SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 4192 62280
PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 6571 62280
SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 1186 62280
SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6319 62280
ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 6122 62280
KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 28674 62280
SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 18381 62280
SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 4258 62280
KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 12680 62280
KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4201 62280
ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 000 62280
PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 19175 62280
AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 078 62280
BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 504 62280
BHAVANI KATTALAI (BKB)(IIIampIII BB I amp II)TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 5847 62280
PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 000 62280
Page 39
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) SRI DAMODARAM STPS APPDCL THERMAL-COAL 160000 808108 36300
PRIVATE SECTOR
KARUPPUR TANJORE LANCO TANJORE PCL THERMAL-GAS 12000 48096 28770
SIMHAPURI ENERGY LTD SIMHAPURI ENERGY LTD THERMAL-COAL 60000 143900 39100
JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 7111 45500
SBU 1 JSW ENERGY LTD
VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 26000 159100
43300
SBU 2 JSW ENERGY LTD
VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 60000 247900
42800
LANCO KPLLANCO KONDAPALLI POWER
LTDTHERMAL-GAS 36814 85060
25776
LANCO KPL STG -IILANCO KONDAPALLI POWER
LTDTHERMAL-GAS 36600 12979
46330
LANCO KPL STG -IIIALANCO KONDAPALLI POWER
LTDTHERMAL-GAS 37100 85710
46330
LANCO KPL STG -III BLANCO KONDAPALLI POWER
LTDTHERMAL-GAS 37100 43639
46330
HINDUJA NATIONAL PCL HINDUJA NATIONAL PCL THERMAL-COAL 104000 303000 38200
MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 121164 49940
UDUPI POWER COR LTD ADANI POWER LTD THERMAL-COAL 120000 754613 42500
SPECTRUM POWER GENERATION
LTD SPECTRUM PG LTD THERMAL-GASN 20525 9256812
34952
TAQA NEYVELI POWER COM PVT
LTD TAQA NEYVELI THERMAL-LIG 25000 5840
34500
ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 251000 51000
ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 207860 36800
GMR VEMAGIRI POWER GENERATION
LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 30117
46450
EASTERN REGION
CENTRAL SECTOR
MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 64675 53113
MTPS STAGE - II KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 39000 1432 69138
BOKARO `B` TPS DVC THERMAL-COAL 63000 145670 31539
MEJIA TPS U 1-3 DVC THERMAL-COAL 63000 348298 31552
MEJIA TPS U 4 DVC THERMAL-COAL 21000 116099 34997
MEJIA TPS U 5-6 DVC THERMAL-COAL 50000 276427 35976
MEJIA TPS U 7-8 DVC THERMAL-COAL 100000 552854 36991
DURGAPUR STEEL TPS DVC THERMAL-COAL 100000 665550 39323
DURGAPUR TPS DVC THERMAL-COAL 21000 59270 35416
RAGHUNATHPUR TPS DVC THERMAL-COAL 120000 201650 35326
MAITHON HYDEL STA DVC HYDRO-HYDRO 6320 12200 17984
CHANDRAPURA TPSU1-3 DVC THERMAL-COAL 42000 257610 35095
CHANDRAPURA TPSU7-8 DVC THERMAL-COAL 50000 306673 34987
KODERMA TPS DVC THERMAL-COAL 100000 380180 38131
PANCHET HPS DVC HYDRO-HYDRO 8000 13360 17984
TILLAYA HPS DVC HYDRO-HYDRO 400 1410 17984
RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34700 35400
TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 277300 23200
TLDP -III NHPC LTD HYDRO-HYDRO 13200 55400 62000
TLDP -IV NHPC LTD HYDRO-HYDRO 16000 60300 25600
FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 957219 33700
FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 308943 41000
BONGAINGAON TPS NTPC LTD THERMAL-COAL 25000 153663 58600
KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 542277 34200
KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 942591 34200
BARH-II NTPC LTD THERMAL-COAL 132000 728021 44500
TALCHER TPS NTPC LTD THERMAL-COAL 46000 335521 30100
TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 702319 25600
TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1436521 24700
STATE SECTOR
BTPS(RampM) BIHAR STATE PGCL THERMAL-COAL 22000 12142 39700
BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 98331 10602
HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 50593 9482
CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 19689 2605
RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 53192 6033
UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 147208 14637
Page 40
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 60353 4519
IB TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 288567 25000
J P H GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 210 038 61100
MEYONG CHU GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 400 1086 61100
TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 122667 38200
DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 214339 43321
KOLAGHAT THERMAL POWER
STATION
WEST BENGAL PDCL THERMAL-COAL 126000 538269 31603
BAKRESHWAR THERMAL POWER
PLANT
WEST BENGAL PDCL THERMAL-COAL 105000 634876 32154
BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 45000 166855 33299
SANTHALDIH THERMAL POWER
STATION
WEST BENGAL PDCL THERMAL-COAL 50000 336442 34932
SAGARDIGHI THERMAL POWER
PROJECT
WEST BENGAL PDCL THERMAL-COAL 160000 423121 34705
JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 20344 68900
RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 24559 68900
TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 4623 68900
PURULIA PUMPED STORAGE
PROJECT
WEST BENGAL SEDCL HYDRO-HYDRO 90000 108816 68900
MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2768 68900
PRIVATE SECTOR
CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 49474 20230
CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 555500 70200
HALDIA ENERGY HALDIA ENERGY LTD THERMAL-COAL 60000 371000 50400
DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3688 63400
KAMALANGA TPS GMR KAMALANGA ENERGY LTD THERMAL-COAL 105000547670
33300
ADHUNIK POWER U-1 ADHUNIK POWER THERMAL-COAL 27000 158 44060
ADHUNIK POWER U-2 ADHUNIK POWER THERMAL-COAL 27000 168 44250
VL-JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 332800 23622
JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 43000 45250
JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 71700 37030
JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 70700 35920
JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 71100 38870
JOJOBERA UNIT 5 TATA POWER COM LTD THERMAL-COAL 12000 79300 44560
JOJOBERA UNIT 6 TATA POWER COM LTD THERMAL-WHR 12000 83700 12840
IEL KALINGANAGAR U-I TATA POWER COM LTD THERMAL-WG 6750 33400 22500
IEL KALINGANAGAR U-II TATA POWER COM LTD THERMAL-WG 6750 34800 22500
MAITHON UNIT 1 amp 2 TATA POWER COM LTD THERMAL-COAL 105000 678000 36100
HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 27500 24340
HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 28400 24340
HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 15800 24310
NORTH EASTERN REGION
CENTRAL SECTOR
LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 74100 36600
AGARTALA GT NEEPCO THERMAL-GAS 13500 88611 27210
ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 153111 32310
DOYANG HEP NEEPCO HYDRO-HYDRO 7500 25598 49801
KOPILI HEP NEEPCO HYDRO-HYDRO 20000 98186 11491
KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 19582 20237
KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 10310 17968
RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 124093 22945
TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 10100 17344 39000
STATE SECTOR
HYDRO POWER (122 Stns) ITANAGAR GOVT OF ARUNACHAL
PRADESHHYDRO-HYDRO 6971 6217270
24600
KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39514 17337
LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 82327 36810
NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 33318 48290
MYNTRIANG SHEP ST II ASSAM POWER GENCO HYDRO-HYDRO 300 567 35776
LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 9130 49200
LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 012 49200
DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 022 49200
TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 000 49200
UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 4990 16000
UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 6476 37000
UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 16494 14600
UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 3600 9556 15000
SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 758 8000
MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44070 44800
KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 154 41400
TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 091 41400
MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 411 41400
MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 394 41400
KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 760 41400
SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 3264 41400
LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 044 41400
BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 18953 28000
ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 43585 28200
GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 4080 11100
Note
LIG Lignite N Naptha WHR Waste Heat Recovery
Page 41
File NoCEA-CH-14-1142018-Coordination Division
SN Contents Page
1 Electricity Generation (MU) Targets and Achievements for 2018-19 22
Section E - Electricity Generation
File NoCEA-CH-14-1142018-Coordination Division
Programme Achievement Ach Programme Achievement Ach
Central Sector 35160700 3028100 3162321 10443 20144400 21150469 10499
State Sector 35132000 3010000 3017260 10024 19922100 19549030 9813
PvtIPP Sector 36999700 3240600 3375603 10417 21598300 20794155 9628
PvtUTL Sector 1857600 164500 180597 10979 1130900 1203107 10638
Total 109150000 9443200 9735781 10310 62795700 62696761 9984
Central Sector 5617600 420900 451004 10715 4193000 4045436 9648
State Sector 6110600 559500 708469 12663 4049400 4433000 10947
PvtIPP Sector 1141800 80500 90122 11195 976400 1021963 10467
PvtUTL Sector 130000 11300 12564 11119 76700 99943 13030
Total 13000000 1072200 1262159 11772 9295500 9600342 10328
Central Sector 3850000 353300 303310 8585 2068900 2203540 10651
Total 3850000 353300 303310 8585 2068900 2203540 10651
Bhutan Import 500000 63300 35395 5592 347000 416660 12007
Central Sector 44628300 3802300 3916635 10301 26406300 27399445 10376
State Sector 41242600 3569500 3725729 10438 23971500 23982030 10004
Pvt Sector 40129100 3496900 3658886 10463 23782300 23119168 9721
Total 126500000 10932000 11336645 10370 74507100 74917303 10055
Provisional based on actual-cum-Assesment
Figs in MU
Cummulative
Achievement
Cummulative
Achievement
Sep-18 Sep-17 Upto Sep-2018 Upto Sep-2017
1073794 748889 7332680 5660929
22
Renewable Energy Generation
Achievement
Oct-2018
1 Electricity Generation (MU) Targets and Achievememts for 2018-19
All India Energy Generation During April 2018- Oct 2018 (MU)
Target (2018-19)April 2018- Oct 2018
Sector
Hydro
Thermal
Nuclear
627957
92955
20689
745071
626968
96003
22035
749173
0
100000
200000
300000
400000
500000
600000
700000
800000
Thermal Hydro Nuclear Total
Programme
Achievement
File NoCEA-CH-14-1142018-Coordination Division
SN Contents Page
1 Energy Power Supply Position (Provisional) for Oct-2018 and during April 2018- Oct 2018 23
2 Peak Power Supply Position (Provisional) for Oct-2018 and during April 2018- Oct 2018 24
3 Energy Power Supply Position (Revised) for Sep-2018 and during April 2018- Sept 2018 25
4 Peak Power Supply Position (Revised) for Sep-2018 and during April 2018- Sept 2018 26
5 Notified Power cuts Restrictions on Industries during Oct-2018 27
6 Power Supply to Agricultural Sector during Oct-2018 28
Section F - Power supply position
File NoCEA-CH-14-1142018-Coordination Division
आकड़ मममलयन यननट नट Figures in MU net
ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied
कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )
चडीगढ़ Chandigarh 108 108 0 00 1055 1055 0 00
दिलली Delhi 2490 2489 1 00 22524 22510 14 01
हरियजणज Haryana 4554 4554 0 00 35205 35205 0 00
दहमजचल परिश Himachal Pradesh 788 787 2 02 5728 5560 168 29
रमम कशमीि Jammu amp Kashmir 1497 1219 278 186 10982 8865 2117 193
परजब Punjab 4418 4418 0 00 38832 38819 13 00
िजरसथजन Rajasthan 6748 6748 0 00 45341 45181 160 04
उतति परिश Uttar Pradesh 10136 9973 164 16 75485 74808 676 09
उततिजखड Uttarakhand 1083 1081 3 03 8395 8310 85 10
उततरी कषतर Northern Region 31822 31375 447 14 243547 240314 3233 13
छततीसगढ़ Chhattisgarh 2454 2453 1 00 16119 16091 28 02
गरिजत Gujarat 11636 11636 0 00 70782 70768 14 00
मधय परिश Madhya Pradesh 5860 5859 1 00 38412 38410 2 00
महजिजषटर Maharashtra 15223 15095 128 08 95489 95355 134 01
िमन औि दिउ Daman amp Diu 216 216 0 00 1523 1523 0 00
िजिि व नगि हवली Dadra amp Nagar Haveli 553 553 0 00 3757 3757 0 00
गोवज Goa 366 366 0 00 2497 2495 2 01
पशचिमी कषतर Western Region 36308 36178 130 04 228579 228398 180 01
आनधर परिश Andhra Pradesh 5860 5854 6 01 37377 37334 43 01
तलगजनज Telangana 6748 6742 6 01 38251 38205 46 01
कनजाटक Karnataka 5842 5835 7 01 39111 39059 52 01
किल Kerala 2116 2096 20 09 14256 14160 96 07
तममल नजड Tamil Nadu 8611 8601 10 01 65742 65666 76 01
पडचिी Puducherry 216 215 1 05 1654 1646 8 05
लकष-दवीप Lakshadweep 4 4 0 0 27 27 0 0
दकषकषणी कषतर Southern Region 29392 29342 50 02 196390 196069 321 02
बबहजि Bihar 2742 2738 4 01 19143 18951 192 10
िजमोिि घजटी ननगम DVC 1712 1698 13 08 13096 12828 268 20
झजिखणड Jharkhand 701 697 4 06 5022 4949 73 15
ओडडशज Odisha 3147 3134 13 04 20224 20192 32 02
पशशचम बगजल West Bengal 4204 4200 4 01 33008 32881 127 04
मसशककम Sikkim 40 40 0 00 279 279 0 01
अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 67 202 188 13 67
परवी कषतर Eastern Region 12547 12507 40 03 90772 90080 692 08
अरणजचल परिश Arunachal Pradesh 67 66 1 09 502 496 7 13
असम Assam 833 809 24 29 6153 5903 250 41
मणणपि Manipur 72 71 1 10 485 478 7 14
मघजलय Meghalaya 147 147 0 00 1043 1042 0 00
ममज़ोिम Mizoram 63 62 1 08 365 359 5 14
नजगजलड Nagaland 76 67 8 110 540 481 59 109
बिपिज Tripura 130 129 1 09 1025 1007 19 18
उततर-परवी कषतर North-Eastern Region 1387 1351 35 25 10113 9766 346 34
समपणण भारत All India 111455 110753 702 06 769399 764627 4773 06
23
ऊराण वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Energy Power Supply Position Report (Provisional)
राजयStateअकरबर2018 October2018 अपरल2018 -अकरबर2018 April2018 to October2018
ऊरजा पनत ा म कमी ऊरजा पनत ा म कमीEnergy not Supplied
Excludes energy exported to Bangladesh
Energy not Supplied
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
File NoCEA-CH-14-1142018-Coordination Division
अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met
कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )
चडीगढ़ Chandigarh 217 217 0 00 369 369 0 00
दिलली Delhi 4713 4713 0 00 7016 7016 0 00
हरियजणज Haryana 7948 7948 0 00 10270 10270 0 00
दहमजचल परिश Himachal Pradesh 1520 1520 0 00 1520 1520 0 00
रमम कशमीि Jammu amp Kashmir 2836 2269 567 200 2951 2361 590 200
परजब Punjab 7979 7979 0 00 12638 12638 0 00
िजरसथजन Rajasthan 11450 11450 0 00 11698 11698 0 00
उतति परिश Uttar Pradesh 17434 16745 688 39 20498 20062 436 21
उततिजखड Uttarakhand 1943 1943 0 00 2143 2143 0 00
उततरी कषतर Northern Region 50659 49635 1024 20 63166 61726 1440 23
छततीसगढ़ Chhattisgarh 4414 4268 146 33 4414 4268 146 33
गरिजत Gujarat 18148 18130 19 01 18148 18130 19 01
मधय परिश Madhya Pradesh 11356 11317 39 03 11356 11317 39 03
महजिजषटर Maharashtra 23864 23159 705 30 23864 23254 610 26
िमन औि दिउ Daman amp Diu 342 341 1 02 357 356 1 02
िजिि व नगि हवली Dadra amp Nagar Haveli 784 780 4 05 816 815 1 01
गोवज Goa 536 536 0 00 596 596 0 00
पशचिमी कषतर Western Region 56548 55695 853 15 56548 55695 853 15
आनधर परिश Andhra Pradesh 9435 9435 0 00 9435 9435 0 00
तलगजनज Telangana 10603 10603 0 00 10815 10815 0 00
कनजाटक Karnataka 10741 10741 0 00 10741 10741 0 00
किल Kerala 3727 3644 83 22 4050 3997 53 13
तममल नजड Tamil Nadu 14747 14333 414 28 15029 14981 47 03
पडचिी Puducherry 363 362 1 03 420 400 19 46
लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0
दकषकषणी कषतर Southern Region 45279 45226 53 01 45946 45684 262 06
बबहजि Bihar 4945 4945 0 00 5050 5045 5 01
िजमोिि घजटी ननगम DVC 2729 2729 0 00 2874 2874 0 00
झजिखणड Jharkhand 1260 1260 0 00 1339 1284 55 41
ओडडशज Odisha 5624 5224 400 71 5624 5357 268 48
पशशचम बगजल West Bengal 8775 8775 0 00 9130 9123 7 01
मसशककम Sikkim 86 86 0 00 90 90 0 00
अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7
परवी कषतर Eastern Region 22959 22567 392 17 22959 22567 392 17
अरणजचल परिश Arunachal Pradesh 138 125 13 94 138 133 5 37
असम Assam 1785 1704 81 45 1865 1809 56 30
मणणपि Manipur 187 185 2 11 193 186 7 36
मघजलय Meghalaya 336 336 0 00 371 368 2 07
ममज़ोिम Mizoram 99 97 2 20 103 98 4 41
नजगजलड Nagaland 134 131 3 22 156 138 18 117
बिपिज Tripura 269 269 0 00 298 293 5 17
उततर-परवी कषतर North-Eastern Region 2790 2700 90 32 2967 2850 117 39
समपणण भारत All India 172945 170604 2341 14 177022 175528 1494 08
24
अधिकतम वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Peak Power Supply Position Report (Provisional)
आकड़ मगज वजट नट Figures in MW netअपरल2018 -अकरबर2018 April2018 to October2018
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
मजग की पनता म कमी Demand not Met
Excludes the supply to Bangladesh
राजयStateअकरबर2018 October2018
मजग की पनता म कमी Demand not Met
File NoCEA-CH-14-1142018-Coordination Division
आकड़ मममलयन यननट नट Figures in MU net
ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied
कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )
चडीगढ़ Chandigarh 141 141 0 00 947 947 0 00
दिलली Delhi 2925 2924 1 00 20034 20021 13 01
हरियजणज Haryana 4794 4794 0 00 30651 30651 0 00
दहमजचल परिश Himachal Pradesh 876 853 24 27 4940 4773 167 34
रमम कशमीि Jammu amp Kashmir 1520 1246 274 180 9485 7646 1839 194
परजब Punjab 5575 5575 0 00 34414 34401 13 00
िजरसथजन Rajasthan 6202 6201 0 00 38594 38434 160 04
उतति परिश Uttar Pradesh 10211 10124 86 08 65349 64836 513 08
उततिजखड Uttarakhand 1162 1149 13 11 7311 7229 82 11
उततरी कषतर Northern Region 33405 33008 398 12 211725 208939 2786 13
छततीसगढ़ Chhattisgarh 2403 2388 15 06 13665 13638 27 02
गरिजत Gujarat 10122 10122 0 00 59146 59132 14 00
मधय परिश Madhya Pradesh 5492 5491 1 00 32552 32551 1 00
महजिजषटर Maharashtra 13615 13612 3 00 80266 80260 6 00
िमन औि दिउ Daman amp Diu 221 221 0 00 1306 1306 0 00
िजिि व नगि हवली Dadra amp Nagar Haveli 551 551 0 00 3204 3204 0 00
गोवज Goa 339 339 0 00 2131 2128 2 01
पशचिमी कषतर Western Region 32742 32723 19 01 192270 192220 50 00
आनधर परिश Andhra Pradesh 5294 5287 7 01 31518 31480 37 01
तलगजनज Telangana 6279 6272 8 01 31503 31463 40 01
कनजाटक Karnataka 5701 5693 8 01 33269 33225 45 01
किल Kerala 2050 2026 24 12 12140 12063 76 06
तममल नजड Tamil Nadu 8971 8959 12 01 57131 57065 66 01
पडचिी Puducherry 226 224 2 08 1438 1431 7 05
लकष-दवीप Lakshadweep 4 4 0 0 23 23 0 0
दकषकषणी कषतर Southern Region 28520 28460 60 02 166998 166727 271 02
बबहजि Bihar 2839 2793 46 16 16400 16213 188 11
िजमोिि घजटी ननगम DVC 1901 1750 151 79 11384 11130 254 22
झजिखणड Jharkhand 740 723 17 22 4321 4252 69 16
ओडडशज Odisha 2921 2918 3 01 17077 17058 19 01
पशशचम बगजल West Bengal 4902 4879 23 05 28804 28681 123 04
मसशककम Sikkim 39 39 0 01 239 239 0 01
अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 67 173 162 12 67
परवी कषतर Eastern Region 13341 13102 240 18 78225 77573 652 08
अरणजचल परिश Arunachal Pradesh 74 73 1 10 435 429 6 14
असम Assam 950 914 36 38 5320 5094 226 43
मणणपि Manipur 70 69 1 11 414 408 6 15
मघजलय Meghalaya 150 150 0 01 896 896 0 01
ममज़ोिम Mizoram 58 57 1 12 302 297 5 16
नजगजलड Nagaland 80 72 8 104 464 414 50 108
बिपिज Tripura 192 191 1 07 895 878 17 19
उततर-परवी कषतर North-Eastern Region 1575 1527 48 31 8726 8415 311 36
समपणण भारत All India 109584 108819 765 07 657944 653873 4071 06
Energy not Supplied Energy not Supplied
ससतबर2018 September2018 अपरल2018 -ससतबर2018 April2018 to September2018
ऊरजा पनत ा म कमी ऊरजा पनत ा म कमी
Excludes energy exported to Bangladesh
राजयState
ऊराण वरवदयत आपरतण शथिरत ररपोरण (सशोधित) Energy Power Supply Position Report (Revised)
25
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
File NoCEA-CH-14-1142018-Coordination Division
अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met
कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )
चडीगढ़ Chandigarh 293 293 0 00 369 369 0 00
दिलली Delhi 5358 5358 0 00 7016 7016 0 00
हरियजणज Haryana 9008 9008 0 00 10270 10270 0 00
दहमजचल परिश Himachal Pradesh 1466 1466 0 00 1479 1479 0 00
रमम कशमीि Jammu amp Kashmir 2951 2361 590 200 2951 2361 590 200
परजब Punjab 11405 11405 0 00 12638 12638 0 00
िजरसथजन Rajasthan 10612 10612 0 00 11698 11698 0 00
उतति परिश Uttar Pradesh 18346 18121 225 12 20498 20062 436 21
उततिजखड Uttarakhand 1996 1996 0 00 2143 2143 0 00
उततरी कषतर Northern Region 56407 55649 758 13 63166 61726 1440 23
छततीसगढ़ Chhattisgarh 4404 4075 328 75 4404 4136 268 61
गरिजत Gujarat 16963 16963 0 00 17053 16963 90 05
मधय परिश Madhya Pradesh 8811 8771 41 05 8811 8775 36 04
महजिजषटर Maharashtra 22455 22349 106 05 23395 23254 141 06
िमन औि दिउ Daman amp Diu 357 356 1 02 357 356 1 02
िजिि व नगि हवली Dadra amp Nagar Haveli 816 815 1 01 816 815 1 01
गोवज Goa 596 596 0 00 596 596 0 00
पशचिमी कषतर Western Region 52933 52895 38 01 53841 52895 945 18
आनधर परिश Andhra Pradesh 9435 9416 19 02 9435 9416 19 02
तलगजनज Telangana 10815 10815 0 00 10815 10815 0 00
कनजाटक Karnataka 10103 10090 13 01 10690 10688 2 00
किल Kerala 3888 3638 251 64 4050 3997 53 13
तममल नजड Tamil Nadu 14556 14553 3 00 15029 14981 47 03
पडचिी Puducherry 390 372 17 45 420 400 19 46
लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0
दकषकषणी कषतर Southern Region 45542 45428 114 02 45946 45684 262 06
बबहजि Bihar 5050 5045 5 01 5050 5045 5 01
िजमोिि घजटी ननगम DVC 2641 2641 0 00 2874 2874 0 00
झजिखणड Jharkhand 1233 1233 0 00 1339 1284 55 41
ओडडशज Odisha 4906 4906 0 00 5357 5357 0 00
पशशचम बगजल West Bengal 8644 8639 5 01 9130 9123 7 01
मसशककम Sikkim 78 78 0 00 90 90 0 00
अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7
परवी कषतर Eastern Region 22110 22100 10 00 22470 22290 180 08
अरणजचल परिश Arunachal Pradesh 132 130 2 15 138 133 5 37
असम Assam 1865 1809 56 30 1865 1809 56 30
मणणपि Manipur 184 182 2 13 193 186 7 36
मघजलय Meghalaya 317 317 0 00 371 368 2 07
ममज़ोिम Mizoram 95 93 2 23 103 98 4 41
नजगजलड Nagaland 142 138 5 32 156 138 18 117
बिपिज Tripura 296 293 3 10 298 293 5 17
उततर-परवी कषतर North-Eastern Region 2921 2850 71 24 2967 2850 117 39
समपणण भारत All India 177022 175528 1494 08 177022 175528 1494 08
26
मजग की पनता म कमी मजग की पनता म कमी Demand not MetDemand not Met
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
Excludes the supply to Bangladesh
अधिकतम वरवदयत आपरतण शथिरत ररपोरण (सशोधित) Peak Power Supply Position Report (Revised)
आकड़ मगज वजट नट Figures in MW net
राजयStateससतबर2018 September2018 अपरल2018 -ससतबर2018 April2018 to September2018
File NoCEA-CH-14-1142018-Coordination Division
अकरबर2018 October2018अपरल2018 -अकरबर2018 April2018 to October2018
उततरी कषतर Northern Region
चडीगढ़ Chandigarh Data not received Data not received
दिलली Delhi
हरियजणज Haryana
दहमजचल परिश Himachal Pradesh
रमम कशमीि Jammu amp Kashmir Data not received Data not received
परजब Punjab
िजरसथजन Rajasthanउतति परिश Uttar Pradesh
उततिजखड Uttarakhand
पशचिमी कषतर Western Region
छततीसगढ़ Chhattisgarh
गरिजत Gujarat
मधय परिश Madhya Pradesh
महजिजषटर Maharashtra
गोवज Goa
दकषकषणी कषतर Southern Region
आनधर परिश Andhra Pradesh
तलगजनज Telangana
कनजाटक Karnataka
किल Kerala
तममल नजड Tamil Nadu
पडचिी Puducherryपरवी कषतर Eastern Region
बबहजि Bihar
झजिखणड Jharkhand
ओडडशज Odisha
पशशचम बगजल West Bengal
N
o No
tified
Cuts
N
o No
tified
Cuts
27
अकरबर 2018 म इडथरीर पर वरवदयत करौती का वरवरवरण Notified Power CutsRestrictions on Industries during October2018
राजय कषतर State Regionऊराणमाग करौती EnergyDemand Cut
No Notified Cuts No Notified Cuts
File NoCEA-CH-14-1142018-Coordination Division
अकरबर2018 October2018अपरल2018 -अकरबर2018 April2018 to October2018
उततरी कषतर Northern Region
चडीगढ़ Chandigarh Data not received Data not received
दिलली Delhi Data not received Data not received
हरियजणज Haryana 940 hrsday 0709 - 0950 hrsday
दहमजचल परिश Himachal Pradesh No cut imposed on agriculture consumers and uninterrupted
power is being supplied to agriculture sector
HPSEBL has only 2 agriculture consumers and uninterrupted
power is being supplied to agriculture sector
रमम कशमीि Jammu amp Kashmir Data not received Data not received
परजब Punjab 0507 hrsday 0349 - 0844 hrsday
िजरसथजन Rajasthan 0630 hrsday 0630 hrsday
उतति परिश Uttar Pradesh 1825 hrsday 1814 - 1858 hrsday
उततिजखड Uttarakhand 2350 hrsday 2128 - 2357 hrsday
पशचिमी कषतर Western Region
छततीसगढ़ Chhattisgarh 18hoursday 18 hrsday
गरिजत Gujarat 805 hrsday 805 hrsday
मधय परिश Madhya Pradesh Three-Phase Supply(Irrigation)-947 hrs day
Three-Phase (Mixed) Supply - 2311 hrs day
Three-Phase Supply(Irrigation)- 0933 - 0947 hrs day Three-
Phase (Mixed) Supply - 2300 - 2320 hrs day
महजिजषटर Maharashtra Three-Phase Supply(Irrigation)- 9 hrs day
Three-Phase (Mixed) Supply - 24 hrs day
Three-Phase Supply(Irrigation)- 9 hrs day
Three-Phase (Mixed) Supply - 24 hrs day
गोवज Goa No restriction No restriction
दकषकषणी कषतर Southern Region
आनधर परिश Andhra Pradesh 07 hrsday 07 hrsday
तलगजनज Telangana 24 hoursday 24 hoursday
कनजाटक Karnataka 6 hrsday 6 hrsday
किल Kerala No Restrictions No Restrictions
तममल नजड Tamil Nadu 9 hrsday (6 hrs during day time and 3 hrs during night time) 9 hrsday (6 hrs during day time and 3 hrs during night time)
पडचिी Puducherry No Restrictions No Restrictions
परवी कषतर Eastern Region
बबहजि Bihar About 18 hrsday About 18 hrsday
झजिखणड Jharkhand About 20 hrsday About 20 hrsday
ओडडशज Odisha 24 hrsday 24 hrsday
पशशचम बगजल West Bengal About 23 hrsday About 23 hrsday
28
अकटबर 2018 कषि कषतर को षिदयत आपरति का षििरण Power Supply to Agricultural Sector during October2018
राजय कषतर State Regionऔसत वरवदयत आपरतण घनरो म Average Hours of Supply
On segregated feeders
File NoCEA-CH-14-1142018-Coordination Division
SNo Contents Page
1 Growth of Installed Capacity since 6th Plan 29
2 Progress of Transmission Sector since 6th Plan 30
3 All India Yearly Coal consumption for Power Generation (Utilities)
4 All India Annual Per Capita Consumption of Electricity since -2006
5 Average cost of power supply amp Average realisation (Paisakwh)
6 Growth of Rural Electrification amp Pump Sets Energisation
7 Status of Hydro Schemes Cleared by the CEA in Oct-2018
Section G - Growth of Power Sector
31
32
File NoCEA-CH-14-1142018-Coordination Division
(In MW)
Coal Gas Diesel Total
End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472
End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634
End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537
End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596
End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921
End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703
End of 12th Plan 19216288 2532938 83763 21832988 6780 4447842 50018 31960630
Up to Oct-2018 19599250 2493722 837629 22176734 6780 4548742 7201281 34604757
Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-17) = 51529 MW
Electricity Generation (MU) Targets and Achievements for 2016-17
Coal Gas Diesel Nuclear Hydro Res Total
1959925 2493722 837629 678000 454874 72012805 22925174
29
1 Growth of Installed Capacity Since 6th Plan
Plan YearThermal
Nuclear Hydro RES (MNRE) Total
Total Installed Capacity 34604757 MW
Coal Gas Diesel Nuclear Hydro Res
File NoCEA-CH-14-1142018-Coordination Division
Progress of Transmission Sector in the Country up to Oct 2018
1 TRANSMISSION LINES (All fig in CKM)
At the end of
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
6th plan 0 0 0 0 0 0 0 0 0 0 0 0 1831 4198 0 6029 1641 44364 0 46005 3472 48562 0 52034
7th plan 0 0 0 0 0 0 0 0 0 0 0 0 13068 6756 0 19824 4560 55071 0 59631 17628 61827 0 79455
8th plan 0 0 0 0 1634 0 0 1634 0 0 0 0 23001 13141 0 36142 6564 73036 0 79600 31199 86177 0 117376
9th plan 0 0 0 0 3234 1504 0 4738 751 409 0 1160 29345 20033 0 49378 8687 88306 0 96993 42017 110252 0 152269
10th plan 0 0 0 0 4368 1504 0 5872 1775 409 0 2184 48708 24730 0 73438 9444 105185 0 114629 64295 131828 0 196123
11th Plan 0 0 0 0 5948 1504 1980 9432 4839 411 0 5250 71023 30191 5605 106819 10140 125010 830 135980 91950 157116 8415 257481
12th Plan 6124 0 0 6124 5948 1504 1980 9432 25465 1177 4598 31240 92482 48240 17065 157787 11014 151276 978 163268 141033 202197 24621 367851
13th Plan (Up
to Mar2018)6124 0 0 6124 5948 1504 1980 9432 28666 1512 4881 35059 98247 54286 19067 171600 11258 156497 1000 168755 150243 213799 26928 390970
13th Plan (Up
to Sep-18)6124 0 0 6124 5948 1504 1980 9432 30952 1512 5059 37523 99683 56069 20662 176414 11318 160958 1000 173276 154025 220043 28701 402769
27150
75050
47900
118050
90650
30
IR addition in 12th Plan (up to
March 2017)
Total IR (up to Oct-18)
IR at the end of 11th Plan
IR at the end of 12th Plan
Envisaged IR Capacity at the end
of 13th Plan
Grand Total
Note - The figure upto the end of 10th plan in for stringing progress including the lines not commissioned Now only commissioned lines are reckoned Accordingly the figure for 10th plan (end) may read as 187555 after adjusting with (-) 10852 Ckm
Inter-regional Power Transfer Capacity
plusmn 800 kV HVDC plusmn 500 kV HVDC 765 kV 400 kV 220 kV
File NoCEA-CH-14-1142018-Coordination Division
2004-05 27800
2005-06 28100
2006-07 30200
2007-08 33000
2008-09 35500
2009-10 36700
2010-11 38700
2011-12 41756
2012-13 45460
2013-14 48940
2014-15 53040
2015-16 54590
2016-17 57430
2017-18 60800
Year
2005-06
2006-07
2007-08
2008-09
2009-10
2010-11
2011-12
2012-13
2013-14
2014-15
2015-16
2016-17
2017-18
2004-05 254 209 7568
2005-06 260 221 7636
2006-07 276 227 7423
2007-08 293 239 7727
2008-09 340 263 8713
2009-10 355 268 8870
2010-11 398 303 11975
2011-12 455 330 13514
2012-13 501 376 14867
2013-14 518 175
2014-15 520
6719
7171
3 All India yearly Coal Consumption for Power Generation (Utilities)
YEARCoal Consumption
Million Tonnes
4 All India Annual per Capita consumption of Electricity Since 2006
Per Capita Consumption ( kWh)
6314
(GrossGen+ Net Import) Mid-year population
5 Average cost of power supply amp average realization ( paiseKWH )
Yearcost of supply
(paiseunit)
Realization(paiseunit)
Including AgricultureOnly
Agriculture
1149
7335
7786
91441
8188
88363
957
1010
1075
1122
File NoCEA-CH-14-1142018-Coordination Division
Source- PFC Reports on the performance of State Power Utilities 31
File NoCEA-CH-14-1142018-Coordination Division
Sl
NoExecuting Agency
Installed
Capacity (MW)Cost (Rs crore)
Date of
Clearance
32
No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification
since 2004-05
65291374575 296361511th Plan
Cumu upto End of 11th Plan
596556 21212860
557439Cummulative up to end of 12th Plan
46708
18423975
499150
2003-042004-05
5743
9769
Cumu upto End of 10th Plan
010407 to 310308
010410 to 310311557976840909
010411 to 310312
412667
86293726
3207
482864
12632
1576036
4451722594
15455554
2314176
397343611750
2093311060316074
65109527813884
6 Growth Of Rural Electrification amp Pumpsets Energisation
Plan Year
9th Plan2002-03
134092626
4111
Pump Sets Energised Villages Electricfied (Nos)
2001-02
284064367244
1218
27801997-981998-991999-002000-01
297594
010408 to 310309010409 to 310310
10th Plan
2005-062006-07
322968331020
Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as
Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received
from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made
available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified
villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is
independent of the earlier published reports
No Hydro Electric Project has been issued concurrenceAppraisal letter by CEA during October 2018
7 Status of Hydro Schemes Cleared by the CEA in Oct-2018
Name of Scheme
File NoCEA-CH-14-1142018-Coordination Division
SN Contents Page
1 Rate of sale of power for the year 2016-17 33-41
RATE OF SALE OF POWER FOR THE YEAR 2016-17
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) NORTHERN REGION
CENTRAL SECTOR
BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 18000 66900 19800
CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 54000 222400 21600
CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 30000 144400 19600
CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 23100 91700 42600
PARBATI - III HPS NHPC LTD HYDRO-HYDRO 52000 68200 54800
DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 28000 95600 30000
CHUTAK NHPC LTD HYDRO-HYDRO 4400 22000 79800
DULHASTI HPS NHPC LTD HYDRO-HYDRO 39000 228000 56400
SALAL HPS NHPC LTD HYDRO-HYDRO 69000 342300 11000
TANAKPUR HPS NHPC LTD HYDRO-HYDRO 9420 43000 29600
URI HPS -I NHPC LTD HYDRO-HYDRO 48000 280300 16000
URI HPS - II NHPC LTD HYDRO-HYDRO 24000 147300 48600
NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 4500 24600 88200
SEWA - II NHPC LTD HYDRO-HYDRO 12000 47100 43400
ANTA CCPP NTPC LTD THERMAL-GASN 41930 67539 32400
AURAIYA CCPP NTPC LTD THERMAL-GASN 66336 53501 39100
BADARPUR TPS NTPC LTD THERMAL-COAL 70500 159153 44800
DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 84000 296170 42300
DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 98000 526686 46300
DADRI CCPP NTPC LTD THERMAL-GASHSD 82978 227469 33000
FARIDABAD CCPP NTPC LTD THERMAL-GASN 43159 115577 30800
RIHAND STPS I NTPC LTD THERMAL-COAL 100000 596766 24500
RIHAND STPS II NTPC LTD THERMAL-COAL 100000 737069 24600
RIHAND STPS III NTPC LTD THERMAL-COAL 100000 706546 30600
SINGRAULI STPS NTPC LTD THERMAL-COAL 200000 1394068 20400
TANDA TPS NTPC LTD THERMAL-COAL 44000 295438 40800
UNCHAHAR TPS I NTPC LTD THERMAL-COAL 42000 256454 39800
UNCHAHAR TPS II NTPC LTD THERMAL-COAL 42000 273577 38900
UNCHAHAR TPS III NTPC LTD THERMAL-COAL 21000 142780 43000
KOLDAM NTPC LTD HYDRO-HYDRO 80000 363260 43600
NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 303575 25841
RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 108000 668677 35374
NJHPS SJVNL HYDRO-HYDRO 150000 699496 23820
RAMPUR HPS SJVNL HYDRO-HYDRO 41202 195982 32260
TEHRI HPP THDC HYDRO-HYDRO 100000 272543 51800
KOTESHWAR HEP THDC HYDRO-HYDRO 40000 106244 53400
IGSTPS JHAJJAR ARAVALI P CPL THERMAL-COAL 150000 510429 49490
NEYVELI BARSINGSAR NEYVELI LIG CORP LTD THERMAL-LIG 25000 127520 38040
STATE SECTOR
PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 21000 14222 48200
PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 21000 19205 48400
PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 25000 102257 42600
PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 25000 62107 41800
DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 60000 312213 41000
RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 120000 35767442200
WYC HYDEL STATION HPGCL HYDRO-HYDRO 6240 20365 24900
GIRI POWER HOUSE HPSEB HYDRO-HYDRO 6000 13958 7600
ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 1695 5467 11900
BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 12000 18528 6700
GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 2250 7462 22500
BASSI POWER HOUSE HPSEB HYDRO-HYDRO 6600 29649 7500
BINWA POWER HOUSE HPSEB HYDRO-HYDRO 600 2749 19300
ANNEXURE-I
RATE OF SALE OF POWER FOR THE YEAR 2016-2017
Page 33
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) GAJ POWER HOUSE HPSEB HYDRO-HYDRO 1050 2914 26700
BANER POWER HOUSE HPSEB HYDRO-HYDRO 1200 2864 16200
HOLI POWER HOUSE HPSEB HYDRO-HYDRO 300 616 22500
THIROT POWER HOUSE HPSEB HYDRO-HYDRO 450 1126 22500
KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 1200 3064 22500
LARJI POWER HOUSE HPSEB HYDRO-HYDRO 12600 53677 23700
NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 250 750 31000
CHABA POWER HOUSE HPSEB HYDRO-HYDRO 175 465 23300
RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 150 101 13400
SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 200 000 22500
KILLAR HPSEB HYDRO-HYDRO 030 050 22500
BHABA AUGUMENP H HPSEB HYDRO-HYDRO 450 1276 22500
BS CHAMBA HPSEB HYDRO-HYDRO 045 099 19500
GUMMA HPSEB HYDRO-HYDRO 300 423 22500
GAS TURBINE POWER STATION IPGCL THERMAL-GAS 27000 67233 39300
PPS-I PPCL THERMAL-GAS 33000 175905 38300
PPS-III PPCL THERMAL-GAS 137120 196879 36100
LOWER JHELUM JampKPDD HYDRO-HYDRO 10500 60214 5100
UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 2260 10514 6300
UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 10500 44202 8500
GANDHARBAL JampKPDD HYDRO-HYDRO 1500 8925 4700
KARNAH MPH JampKPDD HYDRO-HYDRO 200 1122 31000
CHENANI I JampKPDD HYDRO-HYDRO 2330 10892 6600
CHENANI II JampKPDD HYDRO-HYDRO 200 1188 9300
CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 750 3634 14200
IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 375 2108 18500
IGO MERCHELLONG JampKPDD HYDRO-HYDRO 300 1572 29700
PAHALGAM MHP JampKPDD HYDRO-HYDRO 450 1713 32900
MARPACHOO JampKPDD HYDRO-HYDRO 075 375 29800
HAFTAL JampKPDD HYDRO-HYDRO 100 483 28700
SANJAK JampKPDD HYDRO-HYDRO 126 441 36000
SEWA-III JampKPDD HYDRO-HYDRO 900 3273 20200
BHADERWAH JampKPDD HYDRO-HYDRO 150 935 8900
BAZGO JampKPDD HYDRO-HYDRO 030 108 33300
SUMOOR JampKPDD HYDRO-HYDRO 010 045 35400
HUNDER JampKPDD HYDRO-HYDRO 040 176 26200
STAKNA JampKPDD HYDRO-HYDRO 400 1933 4100
KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 124000 662879 31360
SURATGARH TPS RRVUNL THERMAL-COAL 150000 402328 41730
CHHABRA TPS 1amp 2 RRVUNL THERMAL-COAL 50000 305946 36700
CHHABRA TPS 3 RRVUNL THERMAL-COAL 25000 151536 36700
CHHABRA TPS 4 RRVUNL THERMAL-COAL 25000 155896 36700
RAMGARH GT POWER PROJECT RRVUNL THERMAL-COAL 22050 43177 41800
RAMGARH GAS T P PROJECT 3 RRVUNL THERMAL-GAS 5000 93615 41800
DHOLPUR C C POWER PROJECT RRVUNL THERMAL-R-LNG 33000 9486 46110
MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 14000 20855 34192
MINI MICRO HYDEL (MMH) P S RRVUNL HYDRO-HYDRO 2385 851 37800
KALISINDH TPP 1 RRVUNL THERMAL-COAL 60000 341543 45000
KALISINDH TPP 2 RRVUNL THERMAL-COAL 60000 211588 45000
KHARA HEP UPJVNL HYDRO-HYDRO 7200 26654 7200
MATATILLA HEP UPJVNL HYDRO-HYDRO 3060 12219 6500
OBRA HEP UPJVNL HYDRO-HYDRO 9900 21517 6300
RIHAND UPJVNL HYDRO-HYDRO 30000 57369 5500
ANPARA A TPS UPRVUNL THERMAL-COAL 63000 317536 27000
ANPARA B TPS UPRVUNL THERMAL-COAL 100000 705605 22700
ANPARA D UPRVUNL THERMAL-COAL 100000 300158 39800
HARDUAGANJ TPS UPRVUNL THERMAL-COAL 16500 45817 49200
HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 50000 304389 46600
OBRA A TPS UPRVUNL THERMAL-COAL 28800 13158 34000
OBRA B TPS UPRVUNL THERMAL-COAL 100000 328124 21900
Page 34
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) PANKI TPS UPRVUNL THERMAL-COAL 21000 66488 50300
PARICHHA TPS UPRVUNL THERMAL-COAL 22000 38762 49400
PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 42000 231931 45600
PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 50000 276722 50400
CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 24000 70845 8290
CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 14400 75366 8390
DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 3375 9595 12080
DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 5100 18701 10520
KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4140 17359 12330
KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 12000 33001 9420
KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 3000 11953 8320
TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 9000 33983 12460
MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 30400 124510 16110
RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 19800 17897 10550
MPUR UTTARAKHAND JVNL HYDRO-HYDRO 930 5121 19200
PATHRI UTTARAKHAND JVNL HYDRO-HYDRO 2040 11636 14200
GALOGI UTTARAKHAND JVNL HYDRO-HYDRO 300 648 12500
PRIVATE SECTOR
MGTPP CLP INDIA PVT LTD THERMAL-COAL 132000 268902 41940
SHRINAGAR HEP ALAKNANDA HPCL HYDRO-HYDRO 33000 127414 48800
GAMA INFRAPROP CCPP GAMA INFRAPROP PVT THERMAL-GAS 22500 52686 47000
PPGCL (BARA) JP POWER VENTURES LTD THERMAL-COAL 198000 448200 38500
MALANA HEP MALANA PCL HYDRO-HYDRO 8600 26354 29792
MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 10000 30369 32580
ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 19200 56347 36079
KASHANG HEP H P PCL HYDRO-HYDRO 19500 5034 29200
BASPA-II HEP HBPCL HYDRO-HYDRO 30000 132769 13600
KARCHAM WANGTOO HEP HBPCL HYDRO-HYDRO 100000 434386 36600
RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 108000 582600 43700
RITHALA COMBI CY POWER PLANT TATA POWER DDL THERMAL-GAS 9480 000 11900
RAJPURA TPS NABHA POWER LTD THERMAL-GAS 140000 901484 39000
TALWANDI SABO POWER LTD TALWANDI SABO POWER LTD THERMAL-COAL 198000 636040 49548
ROJA THERMAL POWER STATION ROJA POWER SCL THERMAL-COAL 120000 727200 43400
KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 34400 63400
BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 36000 62600
MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 38200 60800
UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 37900 61500
KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 42300 58800
LALITPUR PGCL BAJAJ ENERGY PVT LTD THERMAL-COAL 198000 359400 47300
PRAYAGRAJ PGCL PRAYAGRAJ PGCL THERMAL-COAL 132000 448200 38595
KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 132000 783182 33438
WESTERN REGION
CENTRAL SECTOR
INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 100000 325333 23892
OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 52000 141663 34001
GANDHAR CCPP NTPC LTD THERMAL-GAS 65739 221924 28700
KAWAS CCPP NTPC LTD THERMAL-GASN 65620 167929 27000
KORBA I amp II NTPC LTD THERMAL-COAL 210000 1499171 20500
KORBA III NTPC LTD THERMAL-COAL 50000 358746 26600
SIPAT STPS I NTPC LTD THERMAL-COAL 198000 1479902 26800
SIPAT STPS II NTPC LTD THERMAL-COAL 100000 766549 26500
VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 126000 693142 25800
VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 100000 608781 23800
VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 100000 673475 27600
VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 100000 655924 32900
VINDHYACHAL STPS V NTPC LTD THERMAL-COAL 50000 328265 31700
MOUDA I NTPC LTD THERMAL-COAL 100000 343130 44500
MOUDA Ii NTPC LTD THERMAL-COAL 66000 40637 39900
RATNAGIRI GAS amp POWER PVT LTD RGPPL THERMAL-GAS 196708 442485 47000
KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 000 24729
TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 32000 201227 10740
Page 35
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 365122 19069
TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 787444 29324
STATE SECTOR
GSEG-HAZIRA15610 MW GUJARAT S ENEGEN LTD THERMAL-GAS 15610 1805 28200
GSEG-HAZIRA35143 MW GUJARAT S ENEGEN LTD THERMAL-GAS 35130 22276 51300
GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 21978 51800
AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 13929 26100
KORBA TPS EAST CSPGCL THERMAL-COAL 44000 198673 33880
DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 365808 27570
KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 316500 30420
HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 532878 19410
CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 515 58300
MTTPS CHAMPA U-I CSPGCL THERMAL-COAL 50000 220376 39000
MTTPS CHAMPA U-II CSPGCL THERMAL-COAL 50000 23709 10000
SHP GANGREL CSPGCL HYDRO-HYDRO 1000 2350 36790
BANGO HEP CSPGCL HYDRO-HYDRO 12000 14662 8900
MHP KORBA WEST CSPGCL HYDRO-HYDRO 170 859 38190
SIKASAR HEP CSPGCL HYDRO-HYDRO 700 418 26870
DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8843 74500
DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 19446 51500
GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 66388 71600
GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127488 41300
KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 96072 43900
KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 29841 56400
SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 184966 58800
UKAI 1-5 GSECL THERMAL-COAL 85000 204891 46900
UKAI TPS 6 GSECL THERMAL-COAL 50000 284448 48200
WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 271999 58300
WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 82808 44100
KADANA HPS GSECL HYDRO-HYDRO 24200 34433 16800
UKAI HPS GSECL HYDRO-HYDRO 30500 40585 6100
TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 123000 11500
BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 8900 10900
BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 7200 27500
JHINNA HPS MPPGCL HYDRO-HYDRO 2000 9700 18500
RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 44300 3400
GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 17300 4600
SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 4100 16900
MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 14600 27000
PENCH HPS MPPGCL HYDRO-HYDRO 16000 23700 8100
RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 3000 16900
AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 134400 35100
SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 283800 38700
SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 344600 34300
SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 111600 61600
SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 211800 58000
SSTPS PH-I MPPGCL THERMAL-COAL 120000 233100 84300
BHUSAWAL TPS MSPGCL THERMAL-COAL 142000 566258 51100
CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1365682 33700
KHAPERKHEDA MSPGCL THERMAL-COAL 134000 706207 39100
KORADI TPS MSPGCL THERMAL-COAL 62000 443206 42000
NASIK TPS MSPGCL THERMAL-COAL 63000 297275 47000
PARLI TPS MSPGCL THERMAL-COAL 113000 175934 71600
PARAS MSPGCL THERMAL-COAL 50000 267931 38700
URAN CCPP MSPGCL THERMAL-GAS 67200 320330 30600
KOYANA MSPGCL HYDRO-HYDRO 195600 328155 13100
SMALL HYDRO POWER PLANTS MSPGCL HYDRO-HYDRO 45400 93062 30500
BHIRA MSPGCL HYDRO-HYDRO 8000 10046 8400
TILLARI MSPGCL HYDRO-HYDRO 8900 10584 3100
SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 233298 20500
SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 87633 20500
PRIVATE SECTOR
Page 36
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 81282 46750
JNSTPP(JAYPEE NIGRIE) JP POWER VENTURES LTD THERMAL-COAL 132000 726695 29310
MB POWER MB POWER THERMAL-COAL 120000 345632 38310
ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 754922 28671
ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 780761 23495
ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 198000 1263784 32090
ADANI POWER MAHARA ADANI POWER LTD THERMAL-COAL 330000 1666191 34124
AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 170065 36827
SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 252035 45129
ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 458551 36000
ESSAR POWER MP LTD ESSAR POWER MP LTD THERMAL-COAL 60000 243040 28600
VEDANTA LTD (P P -I) VEDANTA LTD THERMAL-GAS 3000 15044 24000
VEDANTA LTD (P P -II) VEDANTA LTD THERMAL-GAS 3000 21293 24000
PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 8234600 24000
165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 5850 64390
145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 68717 40349
SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 132655 28776
SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 144686 38567
MUNDRA UMPPCOASTAL GUJARAT POWER
LTD THERMAL-IMP COAL 400000 2530300
23900
LANCO AMARKANTAK TPP PATHADIH
U-ILANCO AMARKAN POWER LTD THERMAL-COAL 30000 195500
29200
LANCO AMARKANTAK TPP PATHADIH
U-IILANCO AMARKAN POWER LTD THERMAL-COAL 30000 206900
27600
BARADARHA TPS D B POWER LTD THERMAL-COAL 120000 677373 29200
JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 405000 28900
JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 453000 40500
DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 339437 40700
TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 293400 44000
TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 137200 37000
TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 174900 44000
BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 92900 14100
BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23700 34300
KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 27600 48300
CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2530300 23900
BHANDARDRA HEP -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 2475 54900
SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 161400 26500
SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 445000 39000
SOTHERN REGION
CENTRAL SECTOR
NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 325699 54820
NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 305532 39880
NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 998805 38510
NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 113016 54070
NEYVELI TAMILNADU POWER LTD JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 625274 42200
VALLUR TPS NTPC TECL THERMAL-COAL 150000 856438 42350
R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 1493 84300
RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1502919 29400
RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 341291 31800
SIMHADRI I NTPC LTD THERMAL-COAL 100000 688382 36800
SIMHADRI II NTPC LTD THERMAL-COAL 100000 663657 43400
KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 593110 31324
MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 291625 21764
KKNPP-1 amp 2 NPCIL NUCLEAR-NUCLEAR 200000 572609 40948
MINICOY LAKSHADEEP THERMAL-DIESEL 340 770 29600
KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1097 29600
AMINI LAKSHADEEP THERMAL-DIESEL 265 509 29600
ANDROTT LAKSHADEEP THERMAL-DIESEL 219 524 29600
KALPENI LAKSHADEEP THERMAL-DIESEL 175 356 29600
AGATTI LAKSHADEEP THERMAL-DIESEL 195 658 29600
KADMAT LAKSHADEEP THERMAL-DIESEL 190 414 29600
KILTAN LAKSHADEEP THERMAL-DIESEL 150 269 29600
CHETLET LAKSHADEEP THERMAL-DIESEL 100 139 29600
BITRA LAKSHADEEP THERMAL-DIESEL 043 024 29600
BANGARAM LAKSHADEEP THERMAL-DIESEL 018 009 29600
Page 37
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) STATE SECTOR
Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 721811 46500
Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 50000 336142 46500
RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 237358 46500
RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 239926 46500
RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 124500 46500
SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 62109 46500
UPPER SILERU APGENCO HYDRO-HYDRO 24000 33000 46500
LOWER SILERU APGENCO HYDRO-HYDRO 46000 81066 46500
DONKARAI APGENCO HYDRO-HYDRO 2500 6007 46500
PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 1262 46500
CHETTIPETA APGENCO HYDRO-HYDRO 100 214 46500
MUCHKUND APGENCO HYDRO-HYDRO 12000 37571 46500
NAGARJUNASAGAR RCPH APGENCO HYDRO-HYDRO 9000 606 46500
TUNGABHADRA HES amp HAMPI(AP
Share)
APGENCO HYDRO-HYDRO 7200 6100 46500
KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 352232 42600
KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 288131 32500
KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 319272 46500
RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 40073 44300
KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 308317 46000
KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 308963 51300
SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 61004 76600
NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 17960 75300
PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 20873 58300
POCHAMPAD-I TSPGENCO HYDRO-HYDRO 2700 5455 29800
POCHAMPAD-II TSPGENCO HYDRO-HYDRO 900 1932 40700
NIZAMSAGAR TSPGENCO HYDRO-HYDRO 1000 1126 53400
RAICHUR TPS 1 to 7 KPCL THERMAL-COAL 147000 890866 43800
RAICHUR TPS 8 KPCL THERMAL-COAL 25000 159523 48200
BELLARI TPS 1 KPCL THERMAL-COAL 50000 318679 51100
BELLARI TPS 2 KPCL THERMAL-COAL 50000 232347 55600
BELLARI TPS 3 KPCL THERMAL-COAL 70000 47565 34400
BHADRA PH KPCL HYDRO-HYDRO 3920 2369 45900
GERUSUPPA PH KPCL HYDRO-HYDRO 24000 26990 22000
GHAT PRABHA HEP KPCL HYDRO-HYDRO 3200 4777 25300
KADRA HPS KPCL HYDRO-HYDRO 15000 16889 26800
NAGJHARI KPCL HYDRO-HYDRO 90000 155159 9800
KODASALLI DPH KPCL HYDRO-HYDRO 12000 14854 19200
MUNIRA+MGH+SPH+SPH KPCL HYDRO-HYDRO 22640 48211 7900
SHARAVATHY HPS KPCL HYDRO-HYDRO 108550 276215 5400
ALMATTI DPH KPCL HYDRO-HYDRO 29000 39611 24600
VARAHI UGPH KPCL HYDRO-HYDRO 46000 71368 15600
IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 17196 15300
IDUKKI HPS KSEB HYDRO-HYDRO 78000 137905 15300
KAKKAD HPS KSEB HYDRO-HYDRO 5000 13063 15300
KALLADA HPS KSEB HYDRO-HYDRO 1500 4436 15300
KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 46544 15300
KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 635 15300
LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 30822 15300
MALANKARA HPS KSEB HYDRO-HYDRO 1050 2474 15300
MATTUPETTY KSEB HYDRO-HYDRO 200 230 15300
MALAMPUZHA KSEB HYDRO-HYDRO 250 063 15300
CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 864 15300
URUMI ST I amp II KSEB HYDRO-HYDRO 615 903 15300
LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 248 15300
NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7765 19625 15300
PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 16601 15300
PANNIAR HPS KSEB HYDRO-HYDRO 3240 6217 15300
PORINGALKUTHU KSEB HYDRO-HYDRO 3600 10052 15300
PORINGALKUTHU LBE KSEB HYDRO-HYDRO 1600 9438 15300
PEPPARA KSEB HYDRO-HYDRO 300 395 15300
POOZHITHODE KSEB HYDRO-HYDRO 480 1045 15300
Page 38
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) PEECHI KSEB HYDRO-HYDRO 125 040 15300
RANI-PERUNADU KSEB HYDRO-HYDRO 400 585 15300
SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 79783 15300
SENGULAM HPS KSEB HYDRO-HYDRO 5120 11558 15300
SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 16711 15300
VILANGAD KSEB HYDRO-HYDRO 750 1578 15300
BARAPOLE KSEB HYDRO-HYDRO 1500 1932 15300
VELLATHOOVAL KSEB HYDRO-HYDRO 360 305 15300
CHIM0NY KSEB HYDRO-HYDRO 250 156 15300
ADYANPARA KSEB HYDRO-HYDRO 350 501 15300
BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 554 15300
KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 3801 15300
KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 23132 32800
ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 14416 62280
METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 523970 62280
METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 321270 62280
NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 336575 62280
NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 591240 62280
TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 508966 62280
KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 30897 62280
VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 18720 90699 62280
KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 33593 62280
BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 1047 62280
PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 1250 62280
PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 330 62280
MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 4897 62280
MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 032 62280
KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15681 62280
KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 40608 62280
KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 21342 62280
KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 4717 62280
KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4322 62280
KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2399 62280
METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 4416 62280
METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 8035 62280
BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2187 62280
BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2359 62280
BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2511 62280
BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 1949 62280
BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 1819 62280
POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 172 62280
SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 241 62280
MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 026 62280
THIRUMOORTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 136 62280
PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 9309 62280
VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 353 62280
SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 4192 62280
PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 6571 62280
SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 1186 62280
SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6319 62280
ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 6122 62280
KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 28674 62280
SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 18381 62280
SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 4258 62280
KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 12680 62280
KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4201 62280
ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 000 62280
PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 19175 62280
AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 078 62280
BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 504 62280
BHAVANI KATTALAI (BKB)(IIIampIII BB I amp II)TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 5847 62280
PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 000 62280
Page 39
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) SRI DAMODARAM STPS APPDCL THERMAL-COAL 160000 808108 36300
PRIVATE SECTOR
KARUPPUR TANJORE LANCO TANJORE PCL THERMAL-GAS 12000 48096 28770
SIMHAPURI ENERGY LTD SIMHAPURI ENERGY LTD THERMAL-COAL 60000 143900 39100
JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 7111 45500
SBU 1 JSW ENERGY LTD
VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 26000 159100
43300
SBU 2 JSW ENERGY LTD
VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 60000 247900
42800
LANCO KPLLANCO KONDAPALLI POWER
LTDTHERMAL-GAS 36814 85060
25776
LANCO KPL STG -IILANCO KONDAPALLI POWER
LTDTHERMAL-GAS 36600 12979
46330
LANCO KPL STG -IIIALANCO KONDAPALLI POWER
LTDTHERMAL-GAS 37100 85710
46330
LANCO KPL STG -III BLANCO KONDAPALLI POWER
LTDTHERMAL-GAS 37100 43639
46330
HINDUJA NATIONAL PCL HINDUJA NATIONAL PCL THERMAL-COAL 104000 303000 38200
MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 121164 49940
UDUPI POWER COR LTD ADANI POWER LTD THERMAL-COAL 120000 754613 42500
SPECTRUM POWER GENERATION
LTD SPECTRUM PG LTD THERMAL-GASN 20525 9256812
34952
TAQA NEYVELI POWER COM PVT
LTD TAQA NEYVELI THERMAL-LIG 25000 5840
34500
ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 251000 51000
ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 207860 36800
GMR VEMAGIRI POWER GENERATION
LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 30117
46450
EASTERN REGION
CENTRAL SECTOR
MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 64675 53113
MTPS STAGE - II KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 39000 1432 69138
BOKARO `B` TPS DVC THERMAL-COAL 63000 145670 31539
MEJIA TPS U 1-3 DVC THERMAL-COAL 63000 348298 31552
MEJIA TPS U 4 DVC THERMAL-COAL 21000 116099 34997
MEJIA TPS U 5-6 DVC THERMAL-COAL 50000 276427 35976
MEJIA TPS U 7-8 DVC THERMAL-COAL 100000 552854 36991
DURGAPUR STEEL TPS DVC THERMAL-COAL 100000 665550 39323
DURGAPUR TPS DVC THERMAL-COAL 21000 59270 35416
RAGHUNATHPUR TPS DVC THERMAL-COAL 120000 201650 35326
MAITHON HYDEL STA DVC HYDRO-HYDRO 6320 12200 17984
CHANDRAPURA TPSU1-3 DVC THERMAL-COAL 42000 257610 35095
CHANDRAPURA TPSU7-8 DVC THERMAL-COAL 50000 306673 34987
KODERMA TPS DVC THERMAL-COAL 100000 380180 38131
PANCHET HPS DVC HYDRO-HYDRO 8000 13360 17984
TILLAYA HPS DVC HYDRO-HYDRO 400 1410 17984
RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34700 35400
TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 277300 23200
TLDP -III NHPC LTD HYDRO-HYDRO 13200 55400 62000
TLDP -IV NHPC LTD HYDRO-HYDRO 16000 60300 25600
FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 957219 33700
FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 308943 41000
BONGAINGAON TPS NTPC LTD THERMAL-COAL 25000 153663 58600
KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 542277 34200
KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 942591 34200
BARH-II NTPC LTD THERMAL-COAL 132000 728021 44500
TALCHER TPS NTPC LTD THERMAL-COAL 46000 335521 30100
TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 702319 25600
TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1436521 24700
STATE SECTOR
BTPS(RampM) BIHAR STATE PGCL THERMAL-COAL 22000 12142 39700
BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 98331 10602
HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 50593 9482
CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 19689 2605
RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 53192 6033
UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 147208 14637
Page 40
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 60353 4519
IB TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 288567 25000
J P H GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 210 038 61100
MEYONG CHU GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 400 1086 61100
TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 122667 38200
DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 214339 43321
KOLAGHAT THERMAL POWER
STATION
WEST BENGAL PDCL THERMAL-COAL 126000 538269 31603
BAKRESHWAR THERMAL POWER
PLANT
WEST BENGAL PDCL THERMAL-COAL 105000 634876 32154
BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 45000 166855 33299
SANTHALDIH THERMAL POWER
STATION
WEST BENGAL PDCL THERMAL-COAL 50000 336442 34932
SAGARDIGHI THERMAL POWER
PROJECT
WEST BENGAL PDCL THERMAL-COAL 160000 423121 34705
JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 20344 68900
RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 24559 68900
TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 4623 68900
PURULIA PUMPED STORAGE
PROJECT
WEST BENGAL SEDCL HYDRO-HYDRO 90000 108816 68900
MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2768 68900
PRIVATE SECTOR
CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 49474 20230
CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 555500 70200
HALDIA ENERGY HALDIA ENERGY LTD THERMAL-COAL 60000 371000 50400
DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3688 63400
KAMALANGA TPS GMR KAMALANGA ENERGY LTD THERMAL-COAL 105000547670
33300
ADHUNIK POWER U-1 ADHUNIK POWER THERMAL-COAL 27000 158 44060
ADHUNIK POWER U-2 ADHUNIK POWER THERMAL-COAL 27000 168 44250
VL-JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 332800 23622
JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 43000 45250
JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 71700 37030
JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 70700 35920
JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 71100 38870
JOJOBERA UNIT 5 TATA POWER COM LTD THERMAL-COAL 12000 79300 44560
JOJOBERA UNIT 6 TATA POWER COM LTD THERMAL-WHR 12000 83700 12840
IEL KALINGANAGAR U-I TATA POWER COM LTD THERMAL-WG 6750 33400 22500
IEL KALINGANAGAR U-II TATA POWER COM LTD THERMAL-WG 6750 34800 22500
MAITHON UNIT 1 amp 2 TATA POWER COM LTD THERMAL-COAL 105000 678000 36100
HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 27500 24340
HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 28400 24340
HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 15800 24310
NORTH EASTERN REGION
CENTRAL SECTOR
LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 74100 36600
AGARTALA GT NEEPCO THERMAL-GAS 13500 88611 27210
ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 153111 32310
DOYANG HEP NEEPCO HYDRO-HYDRO 7500 25598 49801
KOPILI HEP NEEPCO HYDRO-HYDRO 20000 98186 11491
KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 19582 20237
KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 10310 17968
RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 124093 22945
TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 10100 17344 39000
STATE SECTOR
HYDRO POWER (122 Stns) ITANAGAR GOVT OF ARUNACHAL
PRADESHHYDRO-HYDRO 6971 6217270
24600
KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39514 17337
LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 82327 36810
NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 33318 48290
MYNTRIANG SHEP ST II ASSAM POWER GENCO HYDRO-HYDRO 300 567 35776
LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 9130 49200
LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 012 49200
DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 022 49200
TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 000 49200
UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 4990 16000
UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 6476 37000
UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 16494 14600
UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 3600 9556 15000
SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 758 8000
MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44070 44800
KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 154 41400
TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 091 41400
MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 411 41400
MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 394 41400
KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 760 41400
SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 3264 41400
LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 044 41400
BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 18953 28000
ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 43585 28200
GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 4080 11100
Note
LIG Lignite N Naptha WHR Waste Heat Recovery
Page 41
File NoCEA-CH-14-1142018-Coordination Division
Programme Achievement Ach Programme Achievement Ach
Central Sector 35160700 3028100 3162321 10443 20144400 21150469 10499
State Sector 35132000 3010000 3017260 10024 19922100 19549030 9813
PvtIPP Sector 36999700 3240600 3375603 10417 21598300 20794155 9628
PvtUTL Sector 1857600 164500 180597 10979 1130900 1203107 10638
Total 109150000 9443200 9735781 10310 62795700 62696761 9984
Central Sector 5617600 420900 451004 10715 4193000 4045436 9648
State Sector 6110600 559500 708469 12663 4049400 4433000 10947
PvtIPP Sector 1141800 80500 90122 11195 976400 1021963 10467
PvtUTL Sector 130000 11300 12564 11119 76700 99943 13030
Total 13000000 1072200 1262159 11772 9295500 9600342 10328
Central Sector 3850000 353300 303310 8585 2068900 2203540 10651
Total 3850000 353300 303310 8585 2068900 2203540 10651
Bhutan Import 500000 63300 35395 5592 347000 416660 12007
Central Sector 44628300 3802300 3916635 10301 26406300 27399445 10376
State Sector 41242600 3569500 3725729 10438 23971500 23982030 10004
Pvt Sector 40129100 3496900 3658886 10463 23782300 23119168 9721
Total 126500000 10932000 11336645 10370 74507100 74917303 10055
Provisional based on actual-cum-Assesment
Figs in MU
Cummulative
Achievement
Cummulative
Achievement
Sep-18 Sep-17 Upto Sep-2018 Upto Sep-2017
1073794 748889 7332680 5660929
22
Renewable Energy Generation
Achievement
Oct-2018
1 Electricity Generation (MU) Targets and Achievememts for 2018-19
All India Energy Generation During April 2018- Oct 2018 (MU)
Target (2018-19)April 2018- Oct 2018
Sector
Hydro
Thermal
Nuclear
627957
92955
20689
745071
626968
96003
22035
749173
0
100000
200000
300000
400000
500000
600000
700000
800000
Thermal Hydro Nuclear Total
Programme
Achievement
File NoCEA-CH-14-1142018-Coordination Division
SN Contents Page
1 Energy Power Supply Position (Provisional) for Oct-2018 and during April 2018- Oct 2018 23
2 Peak Power Supply Position (Provisional) for Oct-2018 and during April 2018- Oct 2018 24
3 Energy Power Supply Position (Revised) for Sep-2018 and during April 2018- Sept 2018 25
4 Peak Power Supply Position (Revised) for Sep-2018 and during April 2018- Sept 2018 26
5 Notified Power cuts Restrictions on Industries during Oct-2018 27
6 Power Supply to Agricultural Sector during Oct-2018 28
Section F - Power supply position
File NoCEA-CH-14-1142018-Coordination Division
आकड़ मममलयन यननट नट Figures in MU net
ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied
कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )
चडीगढ़ Chandigarh 108 108 0 00 1055 1055 0 00
दिलली Delhi 2490 2489 1 00 22524 22510 14 01
हरियजणज Haryana 4554 4554 0 00 35205 35205 0 00
दहमजचल परिश Himachal Pradesh 788 787 2 02 5728 5560 168 29
रमम कशमीि Jammu amp Kashmir 1497 1219 278 186 10982 8865 2117 193
परजब Punjab 4418 4418 0 00 38832 38819 13 00
िजरसथजन Rajasthan 6748 6748 0 00 45341 45181 160 04
उतति परिश Uttar Pradesh 10136 9973 164 16 75485 74808 676 09
उततिजखड Uttarakhand 1083 1081 3 03 8395 8310 85 10
उततरी कषतर Northern Region 31822 31375 447 14 243547 240314 3233 13
छततीसगढ़ Chhattisgarh 2454 2453 1 00 16119 16091 28 02
गरिजत Gujarat 11636 11636 0 00 70782 70768 14 00
मधय परिश Madhya Pradesh 5860 5859 1 00 38412 38410 2 00
महजिजषटर Maharashtra 15223 15095 128 08 95489 95355 134 01
िमन औि दिउ Daman amp Diu 216 216 0 00 1523 1523 0 00
िजिि व नगि हवली Dadra amp Nagar Haveli 553 553 0 00 3757 3757 0 00
गोवज Goa 366 366 0 00 2497 2495 2 01
पशचिमी कषतर Western Region 36308 36178 130 04 228579 228398 180 01
आनधर परिश Andhra Pradesh 5860 5854 6 01 37377 37334 43 01
तलगजनज Telangana 6748 6742 6 01 38251 38205 46 01
कनजाटक Karnataka 5842 5835 7 01 39111 39059 52 01
किल Kerala 2116 2096 20 09 14256 14160 96 07
तममल नजड Tamil Nadu 8611 8601 10 01 65742 65666 76 01
पडचिी Puducherry 216 215 1 05 1654 1646 8 05
लकष-दवीप Lakshadweep 4 4 0 0 27 27 0 0
दकषकषणी कषतर Southern Region 29392 29342 50 02 196390 196069 321 02
बबहजि Bihar 2742 2738 4 01 19143 18951 192 10
िजमोिि घजटी ननगम DVC 1712 1698 13 08 13096 12828 268 20
झजिखणड Jharkhand 701 697 4 06 5022 4949 73 15
ओडडशज Odisha 3147 3134 13 04 20224 20192 32 02
पशशचम बगजल West Bengal 4204 4200 4 01 33008 32881 127 04
मसशककम Sikkim 40 40 0 00 279 279 0 01
अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 67 202 188 13 67
परवी कषतर Eastern Region 12547 12507 40 03 90772 90080 692 08
अरणजचल परिश Arunachal Pradesh 67 66 1 09 502 496 7 13
असम Assam 833 809 24 29 6153 5903 250 41
मणणपि Manipur 72 71 1 10 485 478 7 14
मघजलय Meghalaya 147 147 0 00 1043 1042 0 00
ममज़ोिम Mizoram 63 62 1 08 365 359 5 14
नजगजलड Nagaland 76 67 8 110 540 481 59 109
बिपिज Tripura 130 129 1 09 1025 1007 19 18
उततर-परवी कषतर North-Eastern Region 1387 1351 35 25 10113 9766 346 34
समपणण भारत All India 111455 110753 702 06 769399 764627 4773 06
23
ऊराण वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Energy Power Supply Position Report (Provisional)
राजयStateअकरबर2018 October2018 अपरल2018 -अकरबर2018 April2018 to October2018
ऊरजा पनत ा म कमी ऊरजा पनत ा म कमीEnergy not Supplied
Excludes energy exported to Bangladesh
Energy not Supplied
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
File NoCEA-CH-14-1142018-Coordination Division
अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met
कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )
चडीगढ़ Chandigarh 217 217 0 00 369 369 0 00
दिलली Delhi 4713 4713 0 00 7016 7016 0 00
हरियजणज Haryana 7948 7948 0 00 10270 10270 0 00
दहमजचल परिश Himachal Pradesh 1520 1520 0 00 1520 1520 0 00
रमम कशमीि Jammu amp Kashmir 2836 2269 567 200 2951 2361 590 200
परजब Punjab 7979 7979 0 00 12638 12638 0 00
िजरसथजन Rajasthan 11450 11450 0 00 11698 11698 0 00
उतति परिश Uttar Pradesh 17434 16745 688 39 20498 20062 436 21
उततिजखड Uttarakhand 1943 1943 0 00 2143 2143 0 00
उततरी कषतर Northern Region 50659 49635 1024 20 63166 61726 1440 23
छततीसगढ़ Chhattisgarh 4414 4268 146 33 4414 4268 146 33
गरिजत Gujarat 18148 18130 19 01 18148 18130 19 01
मधय परिश Madhya Pradesh 11356 11317 39 03 11356 11317 39 03
महजिजषटर Maharashtra 23864 23159 705 30 23864 23254 610 26
िमन औि दिउ Daman amp Diu 342 341 1 02 357 356 1 02
िजिि व नगि हवली Dadra amp Nagar Haveli 784 780 4 05 816 815 1 01
गोवज Goa 536 536 0 00 596 596 0 00
पशचिमी कषतर Western Region 56548 55695 853 15 56548 55695 853 15
आनधर परिश Andhra Pradesh 9435 9435 0 00 9435 9435 0 00
तलगजनज Telangana 10603 10603 0 00 10815 10815 0 00
कनजाटक Karnataka 10741 10741 0 00 10741 10741 0 00
किल Kerala 3727 3644 83 22 4050 3997 53 13
तममल नजड Tamil Nadu 14747 14333 414 28 15029 14981 47 03
पडचिी Puducherry 363 362 1 03 420 400 19 46
लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0
दकषकषणी कषतर Southern Region 45279 45226 53 01 45946 45684 262 06
बबहजि Bihar 4945 4945 0 00 5050 5045 5 01
िजमोिि घजटी ननगम DVC 2729 2729 0 00 2874 2874 0 00
झजिखणड Jharkhand 1260 1260 0 00 1339 1284 55 41
ओडडशज Odisha 5624 5224 400 71 5624 5357 268 48
पशशचम बगजल West Bengal 8775 8775 0 00 9130 9123 7 01
मसशककम Sikkim 86 86 0 00 90 90 0 00
अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7
परवी कषतर Eastern Region 22959 22567 392 17 22959 22567 392 17
अरणजचल परिश Arunachal Pradesh 138 125 13 94 138 133 5 37
असम Assam 1785 1704 81 45 1865 1809 56 30
मणणपि Manipur 187 185 2 11 193 186 7 36
मघजलय Meghalaya 336 336 0 00 371 368 2 07
ममज़ोिम Mizoram 99 97 2 20 103 98 4 41
नजगजलड Nagaland 134 131 3 22 156 138 18 117
बिपिज Tripura 269 269 0 00 298 293 5 17
उततर-परवी कषतर North-Eastern Region 2790 2700 90 32 2967 2850 117 39
समपणण भारत All India 172945 170604 2341 14 177022 175528 1494 08
24
अधिकतम वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Peak Power Supply Position Report (Provisional)
आकड़ मगज वजट नट Figures in MW netअपरल2018 -अकरबर2018 April2018 to October2018
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
मजग की पनता म कमी Demand not Met
Excludes the supply to Bangladesh
राजयStateअकरबर2018 October2018
मजग की पनता म कमी Demand not Met
File NoCEA-CH-14-1142018-Coordination Division
आकड़ मममलयन यननट नट Figures in MU net
ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied
कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )
चडीगढ़ Chandigarh 141 141 0 00 947 947 0 00
दिलली Delhi 2925 2924 1 00 20034 20021 13 01
हरियजणज Haryana 4794 4794 0 00 30651 30651 0 00
दहमजचल परिश Himachal Pradesh 876 853 24 27 4940 4773 167 34
रमम कशमीि Jammu amp Kashmir 1520 1246 274 180 9485 7646 1839 194
परजब Punjab 5575 5575 0 00 34414 34401 13 00
िजरसथजन Rajasthan 6202 6201 0 00 38594 38434 160 04
उतति परिश Uttar Pradesh 10211 10124 86 08 65349 64836 513 08
उततिजखड Uttarakhand 1162 1149 13 11 7311 7229 82 11
उततरी कषतर Northern Region 33405 33008 398 12 211725 208939 2786 13
छततीसगढ़ Chhattisgarh 2403 2388 15 06 13665 13638 27 02
गरिजत Gujarat 10122 10122 0 00 59146 59132 14 00
मधय परिश Madhya Pradesh 5492 5491 1 00 32552 32551 1 00
महजिजषटर Maharashtra 13615 13612 3 00 80266 80260 6 00
िमन औि दिउ Daman amp Diu 221 221 0 00 1306 1306 0 00
िजिि व नगि हवली Dadra amp Nagar Haveli 551 551 0 00 3204 3204 0 00
गोवज Goa 339 339 0 00 2131 2128 2 01
पशचिमी कषतर Western Region 32742 32723 19 01 192270 192220 50 00
आनधर परिश Andhra Pradesh 5294 5287 7 01 31518 31480 37 01
तलगजनज Telangana 6279 6272 8 01 31503 31463 40 01
कनजाटक Karnataka 5701 5693 8 01 33269 33225 45 01
किल Kerala 2050 2026 24 12 12140 12063 76 06
तममल नजड Tamil Nadu 8971 8959 12 01 57131 57065 66 01
पडचिी Puducherry 226 224 2 08 1438 1431 7 05
लकष-दवीप Lakshadweep 4 4 0 0 23 23 0 0
दकषकषणी कषतर Southern Region 28520 28460 60 02 166998 166727 271 02
बबहजि Bihar 2839 2793 46 16 16400 16213 188 11
िजमोिि घजटी ननगम DVC 1901 1750 151 79 11384 11130 254 22
झजिखणड Jharkhand 740 723 17 22 4321 4252 69 16
ओडडशज Odisha 2921 2918 3 01 17077 17058 19 01
पशशचम बगजल West Bengal 4902 4879 23 05 28804 28681 123 04
मसशककम Sikkim 39 39 0 01 239 239 0 01
अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 67 173 162 12 67
परवी कषतर Eastern Region 13341 13102 240 18 78225 77573 652 08
अरणजचल परिश Arunachal Pradesh 74 73 1 10 435 429 6 14
असम Assam 950 914 36 38 5320 5094 226 43
मणणपि Manipur 70 69 1 11 414 408 6 15
मघजलय Meghalaya 150 150 0 01 896 896 0 01
ममज़ोिम Mizoram 58 57 1 12 302 297 5 16
नजगजलड Nagaland 80 72 8 104 464 414 50 108
बिपिज Tripura 192 191 1 07 895 878 17 19
उततर-परवी कषतर North-Eastern Region 1575 1527 48 31 8726 8415 311 36
समपणण भारत All India 109584 108819 765 07 657944 653873 4071 06
Energy not Supplied Energy not Supplied
ससतबर2018 September2018 अपरल2018 -ससतबर2018 April2018 to September2018
ऊरजा पनत ा म कमी ऊरजा पनत ा म कमी
Excludes energy exported to Bangladesh
राजयState
ऊराण वरवदयत आपरतण शथिरत ररपोरण (सशोधित) Energy Power Supply Position Report (Revised)
25
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
File NoCEA-CH-14-1142018-Coordination Division
अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met
कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )
चडीगढ़ Chandigarh 293 293 0 00 369 369 0 00
दिलली Delhi 5358 5358 0 00 7016 7016 0 00
हरियजणज Haryana 9008 9008 0 00 10270 10270 0 00
दहमजचल परिश Himachal Pradesh 1466 1466 0 00 1479 1479 0 00
रमम कशमीि Jammu amp Kashmir 2951 2361 590 200 2951 2361 590 200
परजब Punjab 11405 11405 0 00 12638 12638 0 00
िजरसथजन Rajasthan 10612 10612 0 00 11698 11698 0 00
उतति परिश Uttar Pradesh 18346 18121 225 12 20498 20062 436 21
उततिजखड Uttarakhand 1996 1996 0 00 2143 2143 0 00
उततरी कषतर Northern Region 56407 55649 758 13 63166 61726 1440 23
छततीसगढ़ Chhattisgarh 4404 4075 328 75 4404 4136 268 61
गरिजत Gujarat 16963 16963 0 00 17053 16963 90 05
मधय परिश Madhya Pradesh 8811 8771 41 05 8811 8775 36 04
महजिजषटर Maharashtra 22455 22349 106 05 23395 23254 141 06
िमन औि दिउ Daman amp Diu 357 356 1 02 357 356 1 02
िजिि व नगि हवली Dadra amp Nagar Haveli 816 815 1 01 816 815 1 01
गोवज Goa 596 596 0 00 596 596 0 00
पशचिमी कषतर Western Region 52933 52895 38 01 53841 52895 945 18
आनधर परिश Andhra Pradesh 9435 9416 19 02 9435 9416 19 02
तलगजनज Telangana 10815 10815 0 00 10815 10815 0 00
कनजाटक Karnataka 10103 10090 13 01 10690 10688 2 00
किल Kerala 3888 3638 251 64 4050 3997 53 13
तममल नजड Tamil Nadu 14556 14553 3 00 15029 14981 47 03
पडचिी Puducherry 390 372 17 45 420 400 19 46
लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0
दकषकषणी कषतर Southern Region 45542 45428 114 02 45946 45684 262 06
बबहजि Bihar 5050 5045 5 01 5050 5045 5 01
िजमोिि घजटी ननगम DVC 2641 2641 0 00 2874 2874 0 00
झजिखणड Jharkhand 1233 1233 0 00 1339 1284 55 41
ओडडशज Odisha 4906 4906 0 00 5357 5357 0 00
पशशचम बगजल West Bengal 8644 8639 5 01 9130 9123 7 01
मसशककम Sikkim 78 78 0 00 90 90 0 00
अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7
परवी कषतर Eastern Region 22110 22100 10 00 22470 22290 180 08
अरणजचल परिश Arunachal Pradesh 132 130 2 15 138 133 5 37
असम Assam 1865 1809 56 30 1865 1809 56 30
मणणपि Manipur 184 182 2 13 193 186 7 36
मघजलय Meghalaya 317 317 0 00 371 368 2 07
ममज़ोिम Mizoram 95 93 2 23 103 98 4 41
नजगजलड Nagaland 142 138 5 32 156 138 18 117
बिपिज Tripura 296 293 3 10 298 293 5 17
उततर-परवी कषतर North-Eastern Region 2921 2850 71 24 2967 2850 117 39
समपणण भारत All India 177022 175528 1494 08 177022 175528 1494 08
26
मजग की पनता म कमी मजग की पनता म कमी Demand not MetDemand not Met
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
Excludes the supply to Bangladesh
अधिकतम वरवदयत आपरतण शथिरत ररपोरण (सशोधित) Peak Power Supply Position Report (Revised)
आकड़ मगज वजट नट Figures in MW net
राजयStateससतबर2018 September2018 अपरल2018 -ससतबर2018 April2018 to September2018
File NoCEA-CH-14-1142018-Coordination Division
अकरबर2018 October2018अपरल2018 -अकरबर2018 April2018 to October2018
उततरी कषतर Northern Region
चडीगढ़ Chandigarh Data not received Data not received
दिलली Delhi
हरियजणज Haryana
दहमजचल परिश Himachal Pradesh
रमम कशमीि Jammu amp Kashmir Data not received Data not received
परजब Punjab
िजरसथजन Rajasthanउतति परिश Uttar Pradesh
उततिजखड Uttarakhand
पशचिमी कषतर Western Region
छततीसगढ़ Chhattisgarh
गरिजत Gujarat
मधय परिश Madhya Pradesh
महजिजषटर Maharashtra
गोवज Goa
दकषकषणी कषतर Southern Region
आनधर परिश Andhra Pradesh
तलगजनज Telangana
कनजाटक Karnataka
किल Kerala
तममल नजड Tamil Nadu
पडचिी Puducherryपरवी कषतर Eastern Region
बबहजि Bihar
झजिखणड Jharkhand
ओडडशज Odisha
पशशचम बगजल West Bengal
N
o No
tified
Cuts
N
o No
tified
Cuts
27
अकरबर 2018 म इडथरीर पर वरवदयत करौती का वरवरवरण Notified Power CutsRestrictions on Industries during October2018
राजय कषतर State Regionऊराणमाग करौती EnergyDemand Cut
No Notified Cuts No Notified Cuts
File NoCEA-CH-14-1142018-Coordination Division
अकरबर2018 October2018अपरल2018 -अकरबर2018 April2018 to October2018
उततरी कषतर Northern Region
चडीगढ़ Chandigarh Data not received Data not received
दिलली Delhi Data not received Data not received
हरियजणज Haryana 940 hrsday 0709 - 0950 hrsday
दहमजचल परिश Himachal Pradesh No cut imposed on agriculture consumers and uninterrupted
power is being supplied to agriculture sector
HPSEBL has only 2 agriculture consumers and uninterrupted
power is being supplied to agriculture sector
रमम कशमीि Jammu amp Kashmir Data not received Data not received
परजब Punjab 0507 hrsday 0349 - 0844 hrsday
िजरसथजन Rajasthan 0630 hrsday 0630 hrsday
उतति परिश Uttar Pradesh 1825 hrsday 1814 - 1858 hrsday
उततिजखड Uttarakhand 2350 hrsday 2128 - 2357 hrsday
पशचिमी कषतर Western Region
छततीसगढ़ Chhattisgarh 18hoursday 18 hrsday
गरिजत Gujarat 805 hrsday 805 hrsday
मधय परिश Madhya Pradesh Three-Phase Supply(Irrigation)-947 hrs day
Three-Phase (Mixed) Supply - 2311 hrs day
Three-Phase Supply(Irrigation)- 0933 - 0947 hrs day Three-
Phase (Mixed) Supply - 2300 - 2320 hrs day
महजिजषटर Maharashtra Three-Phase Supply(Irrigation)- 9 hrs day
Three-Phase (Mixed) Supply - 24 hrs day
Three-Phase Supply(Irrigation)- 9 hrs day
Three-Phase (Mixed) Supply - 24 hrs day
गोवज Goa No restriction No restriction
दकषकषणी कषतर Southern Region
आनधर परिश Andhra Pradesh 07 hrsday 07 hrsday
तलगजनज Telangana 24 hoursday 24 hoursday
कनजाटक Karnataka 6 hrsday 6 hrsday
किल Kerala No Restrictions No Restrictions
तममल नजड Tamil Nadu 9 hrsday (6 hrs during day time and 3 hrs during night time) 9 hrsday (6 hrs during day time and 3 hrs during night time)
पडचिी Puducherry No Restrictions No Restrictions
परवी कषतर Eastern Region
बबहजि Bihar About 18 hrsday About 18 hrsday
झजिखणड Jharkhand About 20 hrsday About 20 hrsday
ओडडशज Odisha 24 hrsday 24 hrsday
पशशचम बगजल West Bengal About 23 hrsday About 23 hrsday
28
अकटबर 2018 कषि कषतर को षिदयत आपरति का षििरण Power Supply to Agricultural Sector during October2018
राजय कषतर State Regionऔसत वरवदयत आपरतण घनरो म Average Hours of Supply
On segregated feeders
File NoCEA-CH-14-1142018-Coordination Division
SNo Contents Page
1 Growth of Installed Capacity since 6th Plan 29
2 Progress of Transmission Sector since 6th Plan 30
3 All India Yearly Coal consumption for Power Generation (Utilities)
4 All India Annual Per Capita Consumption of Electricity since -2006
5 Average cost of power supply amp Average realisation (Paisakwh)
6 Growth of Rural Electrification amp Pump Sets Energisation
7 Status of Hydro Schemes Cleared by the CEA in Oct-2018
Section G - Growth of Power Sector
31
32
File NoCEA-CH-14-1142018-Coordination Division
(In MW)
Coal Gas Diesel Total
End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472
End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634
End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537
End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596
End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921
End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703
End of 12th Plan 19216288 2532938 83763 21832988 6780 4447842 50018 31960630
Up to Oct-2018 19599250 2493722 837629 22176734 6780 4548742 7201281 34604757
Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-17) = 51529 MW
Electricity Generation (MU) Targets and Achievements for 2016-17
Coal Gas Diesel Nuclear Hydro Res Total
1959925 2493722 837629 678000 454874 72012805 22925174
29
1 Growth of Installed Capacity Since 6th Plan
Plan YearThermal
Nuclear Hydro RES (MNRE) Total
Total Installed Capacity 34604757 MW
Coal Gas Diesel Nuclear Hydro Res
File NoCEA-CH-14-1142018-Coordination Division
Progress of Transmission Sector in the Country up to Oct 2018
1 TRANSMISSION LINES (All fig in CKM)
At the end of
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
6th plan 0 0 0 0 0 0 0 0 0 0 0 0 1831 4198 0 6029 1641 44364 0 46005 3472 48562 0 52034
7th plan 0 0 0 0 0 0 0 0 0 0 0 0 13068 6756 0 19824 4560 55071 0 59631 17628 61827 0 79455
8th plan 0 0 0 0 1634 0 0 1634 0 0 0 0 23001 13141 0 36142 6564 73036 0 79600 31199 86177 0 117376
9th plan 0 0 0 0 3234 1504 0 4738 751 409 0 1160 29345 20033 0 49378 8687 88306 0 96993 42017 110252 0 152269
10th plan 0 0 0 0 4368 1504 0 5872 1775 409 0 2184 48708 24730 0 73438 9444 105185 0 114629 64295 131828 0 196123
11th Plan 0 0 0 0 5948 1504 1980 9432 4839 411 0 5250 71023 30191 5605 106819 10140 125010 830 135980 91950 157116 8415 257481
12th Plan 6124 0 0 6124 5948 1504 1980 9432 25465 1177 4598 31240 92482 48240 17065 157787 11014 151276 978 163268 141033 202197 24621 367851
13th Plan (Up
to Mar2018)6124 0 0 6124 5948 1504 1980 9432 28666 1512 4881 35059 98247 54286 19067 171600 11258 156497 1000 168755 150243 213799 26928 390970
13th Plan (Up
to Sep-18)6124 0 0 6124 5948 1504 1980 9432 30952 1512 5059 37523 99683 56069 20662 176414 11318 160958 1000 173276 154025 220043 28701 402769
27150
75050
47900
118050
90650
30
IR addition in 12th Plan (up to
March 2017)
Total IR (up to Oct-18)
IR at the end of 11th Plan
IR at the end of 12th Plan
Envisaged IR Capacity at the end
of 13th Plan
Grand Total
Note - The figure upto the end of 10th plan in for stringing progress including the lines not commissioned Now only commissioned lines are reckoned Accordingly the figure for 10th plan (end) may read as 187555 after adjusting with (-) 10852 Ckm
Inter-regional Power Transfer Capacity
plusmn 800 kV HVDC plusmn 500 kV HVDC 765 kV 400 kV 220 kV
File NoCEA-CH-14-1142018-Coordination Division
2004-05 27800
2005-06 28100
2006-07 30200
2007-08 33000
2008-09 35500
2009-10 36700
2010-11 38700
2011-12 41756
2012-13 45460
2013-14 48940
2014-15 53040
2015-16 54590
2016-17 57430
2017-18 60800
Year
2005-06
2006-07
2007-08
2008-09
2009-10
2010-11
2011-12
2012-13
2013-14
2014-15
2015-16
2016-17
2017-18
2004-05 254 209 7568
2005-06 260 221 7636
2006-07 276 227 7423
2007-08 293 239 7727
2008-09 340 263 8713
2009-10 355 268 8870
2010-11 398 303 11975
2011-12 455 330 13514
2012-13 501 376 14867
2013-14 518 175
2014-15 520
6719
7171
3 All India yearly Coal Consumption for Power Generation (Utilities)
YEARCoal Consumption
Million Tonnes
4 All India Annual per Capita consumption of Electricity Since 2006
Per Capita Consumption ( kWh)
6314
(GrossGen+ Net Import) Mid-year population
5 Average cost of power supply amp average realization ( paiseKWH )
Yearcost of supply
(paiseunit)
Realization(paiseunit)
Including AgricultureOnly
Agriculture
1149
7335
7786
91441
8188
88363
957
1010
1075
1122
File NoCEA-CH-14-1142018-Coordination Division
Source- PFC Reports on the performance of State Power Utilities 31
File NoCEA-CH-14-1142018-Coordination Division
Sl
NoExecuting Agency
Installed
Capacity (MW)Cost (Rs crore)
Date of
Clearance
32
No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification
since 2004-05
65291374575 296361511th Plan
Cumu upto End of 11th Plan
596556 21212860
557439Cummulative up to end of 12th Plan
46708
18423975
499150
2003-042004-05
5743
9769
Cumu upto End of 10th Plan
010407 to 310308
010410 to 310311557976840909
010411 to 310312
412667
86293726
3207
482864
12632
1576036
4451722594
15455554
2314176
397343611750
2093311060316074
65109527813884
6 Growth Of Rural Electrification amp Pumpsets Energisation
Plan Year
9th Plan2002-03
134092626
4111
Pump Sets Energised Villages Electricfied (Nos)
2001-02
284064367244
1218
27801997-981998-991999-002000-01
297594
010408 to 310309010409 to 310310
10th Plan
2005-062006-07
322968331020
Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as
Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received
from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made
available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified
villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is
independent of the earlier published reports
No Hydro Electric Project has been issued concurrenceAppraisal letter by CEA during October 2018
7 Status of Hydro Schemes Cleared by the CEA in Oct-2018
Name of Scheme
File NoCEA-CH-14-1142018-Coordination Division
SN Contents Page
1 Rate of sale of power for the year 2016-17 33-41
RATE OF SALE OF POWER FOR THE YEAR 2016-17
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) NORTHERN REGION
CENTRAL SECTOR
BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 18000 66900 19800
CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 54000 222400 21600
CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 30000 144400 19600
CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 23100 91700 42600
PARBATI - III HPS NHPC LTD HYDRO-HYDRO 52000 68200 54800
DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 28000 95600 30000
CHUTAK NHPC LTD HYDRO-HYDRO 4400 22000 79800
DULHASTI HPS NHPC LTD HYDRO-HYDRO 39000 228000 56400
SALAL HPS NHPC LTD HYDRO-HYDRO 69000 342300 11000
TANAKPUR HPS NHPC LTD HYDRO-HYDRO 9420 43000 29600
URI HPS -I NHPC LTD HYDRO-HYDRO 48000 280300 16000
URI HPS - II NHPC LTD HYDRO-HYDRO 24000 147300 48600
NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 4500 24600 88200
SEWA - II NHPC LTD HYDRO-HYDRO 12000 47100 43400
ANTA CCPP NTPC LTD THERMAL-GASN 41930 67539 32400
AURAIYA CCPP NTPC LTD THERMAL-GASN 66336 53501 39100
BADARPUR TPS NTPC LTD THERMAL-COAL 70500 159153 44800
DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 84000 296170 42300
DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 98000 526686 46300
DADRI CCPP NTPC LTD THERMAL-GASHSD 82978 227469 33000
FARIDABAD CCPP NTPC LTD THERMAL-GASN 43159 115577 30800
RIHAND STPS I NTPC LTD THERMAL-COAL 100000 596766 24500
RIHAND STPS II NTPC LTD THERMAL-COAL 100000 737069 24600
RIHAND STPS III NTPC LTD THERMAL-COAL 100000 706546 30600
SINGRAULI STPS NTPC LTD THERMAL-COAL 200000 1394068 20400
TANDA TPS NTPC LTD THERMAL-COAL 44000 295438 40800
UNCHAHAR TPS I NTPC LTD THERMAL-COAL 42000 256454 39800
UNCHAHAR TPS II NTPC LTD THERMAL-COAL 42000 273577 38900
UNCHAHAR TPS III NTPC LTD THERMAL-COAL 21000 142780 43000
KOLDAM NTPC LTD HYDRO-HYDRO 80000 363260 43600
NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 303575 25841
RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 108000 668677 35374
NJHPS SJVNL HYDRO-HYDRO 150000 699496 23820
RAMPUR HPS SJVNL HYDRO-HYDRO 41202 195982 32260
TEHRI HPP THDC HYDRO-HYDRO 100000 272543 51800
KOTESHWAR HEP THDC HYDRO-HYDRO 40000 106244 53400
IGSTPS JHAJJAR ARAVALI P CPL THERMAL-COAL 150000 510429 49490
NEYVELI BARSINGSAR NEYVELI LIG CORP LTD THERMAL-LIG 25000 127520 38040
STATE SECTOR
PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 21000 14222 48200
PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 21000 19205 48400
PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 25000 102257 42600
PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 25000 62107 41800
DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 60000 312213 41000
RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 120000 35767442200
WYC HYDEL STATION HPGCL HYDRO-HYDRO 6240 20365 24900
GIRI POWER HOUSE HPSEB HYDRO-HYDRO 6000 13958 7600
ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 1695 5467 11900
BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 12000 18528 6700
GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 2250 7462 22500
BASSI POWER HOUSE HPSEB HYDRO-HYDRO 6600 29649 7500
BINWA POWER HOUSE HPSEB HYDRO-HYDRO 600 2749 19300
ANNEXURE-I
RATE OF SALE OF POWER FOR THE YEAR 2016-2017
Page 33
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) GAJ POWER HOUSE HPSEB HYDRO-HYDRO 1050 2914 26700
BANER POWER HOUSE HPSEB HYDRO-HYDRO 1200 2864 16200
HOLI POWER HOUSE HPSEB HYDRO-HYDRO 300 616 22500
THIROT POWER HOUSE HPSEB HYDRO-HYDRO 450 1126 22500
KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 1200 3064 22500
LARJI POWER HOUSE HPSEB HYDRO-HYDRO 12600 53677 23700
NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 250 750 31000
CHABA POWER HOUSE HPSEB HYDRO-HYDRO 175 465 23300
RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 150 101 13400
SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 200 000 22500
KILLAR HPSEB HYDRO-HYDRO 030 050 22500
BHABA AUGUMENP H HPSEB HYDRO-HYDRO 450 1276 22500
BS CHAMBA HPSEB HYDRO-HYDRO 045 099 19500
GUMMA HPSEB HYDRO-HYDRO 300 423 22500
GAS TURBINE POWER STATION IPGCL THERMAL-GAS 27000 67233 39300
PPS-I PPCL THERMAL-GAS 33000 175905 38300
PPS-III PPCL THERMAL-GAS 137120 196879 36100
LOWER JHELUM JampKPDD HYDRO-HYDRO 10500 60214 5100
UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 2260 10514 6300
UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 10500 44202 8500
GANDHARBAL JampKPDD HYDRO-HYDRO 1500 8925 4700
KARNAH MPH JampKPDD HYDRO-HYDRO 200 1122 31000
CHENANI I JampKPDD HYDRO-HYDRO 2330 10892 6600
CHENANI II JampKPDD HYDRO-HYDRO 200 1188 9300
CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 750 3634 14200
IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 375 2108 18500
IGO MERCHELLONG JampKPDD HYDRO-HYDRO 300 1572 29700
PAHALGAM MHP JampKPDD HYDRO-HYDRO 450 1713 32900
MARPACHOO JampKPDD HYDRO-HYDRO 075 375 29800
HAFTAL JampKPDD HYDRO-HYDRO 100 483 28700
SANJAK JampKPDD HYDRO-HYDRO 126 441 36000
SEWA-III JampKPDD HYDRO-HYDRO 900 3273 20200
BHADERWAH JampKPDD HYDRO-HYDRO 150 935 8900
BAZGO JampKPDD HYDRO-HYDRO 030 108 33300
SUMOOR JampKPDD HYDRO-HYDRO 010 045 35400
HUNDER JampKPDD HYDRO-HYDRO 040 176 26200
STAKNA JampKPDD HYDRO-HYDRO 400 1933 4100
KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 124000 662879 31360
SURATGARH TPS RRVUNL THERMAL-COAL 150000 402328 41730
CHHABRA TPS 1amp 2 RRVUNL THERMAL-COAL 50000 305946 36700
CHHABRA TPS 3 RRVUNL THERMAL-COAL 25000 151536 36700
CHHABRA TPS 4 RRVUNL THERMAL-COAL 25000 155896 36700
RAMGARH GT POWER PROJECT RRVUNL THERMAL-COAL 22050 43177 41800
RAMGARH GAS T P PROJECT 3 RRVUNL THERMAL-GAS 5000 93615 41800
DHOLPUR C C POWER PROJECT RRVUNL THERMAL-R-LNG 33000 9486 46110
MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 14000 20855 34192
MINI MICRO HYDEL (MMH) P S RRVUNL HYDRO-HYDRO 2385 851 37800
KALISINDH TPP 1 RRVUNL THERMAL-COAL 60000 341543 45000
KALISINDH TPP 2 RRVUNL THERMAL-COAL 60000 211588 45000
KHARA HEP UPJVNL HYDRO-HYDRO 7200 26654 7200
MATATILLA HEP UPJVNL HYDRO-HYDRO 3060 12219 6500
OBRA HEP UPJVNL HYDRO-HYDRO 9900 21517 6300
RIHAND UPJVNL HYDRO-HYDRO 30000 57369 5500
ANPARA A TPS UPRVUNL THERMAL-COAL 63000 317536 27000
ANPARA B TPS UPRVUNL THERMAL-COAL 100000 705605 22700
ANPARA D UPRVUNL THERMAL-COAL 100000 300158 39800
HARDUAGANJ TPS UPRVUNL THERMAL-COAL 16500 45817 49200
HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 50000 304389 46600
OBRA A TPS UPRVUNL THERMAL-COAL 28800 13158 34000
OBRA B TPS UPRVUNL THERMAL-COAL 100000 328124 21900
Page 34
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) PANKI TPS UPRVUNL THERMAL-COAL 21000 66488 50300
PARICHHA TPS UPRVUNL THERMAL-COAL 22000 38762 49400
PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 42000 231931 45600
PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 50000 276722 50400
CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 24000 70845 8290
CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 14400 75366 8390
DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 3375 9595 12080
DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 5100 18701 10520
KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4140 17359 12330
KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 12000 33001 9420
KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 3000 11953 8320
TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 9000 33983 12460
MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 30400 124510 16110
RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 19800 17897 10550
MPUR UTTARAKHAND JVNL HYDRO-HYDRO 930 5121 19200
PATHRI UTTARAKHAND JVNL HYDRO-HYDRO 2040 11636 14200
GALOGI UTTARAKHAND JVNL HYDRO-HYDRO 300 648 12500
PRIVATE SECTOR
MGTPP CLP INDIA PVT LTD THERMAL-COAL 132000 268902 41940
SHRINAGAR HEP ALAKNANDA HPCL HYDRO-HYDRO 33000 127414 48800
GAMA INFRAPROP CCPP GAMA INFRAPROP PVT THERMAL-GAS 22500 52686 47000
PPGCL (BARA) JP POWER VENTURES LTD THERMAL-COAL 198000 448200 38500
MALANA HEP MALANA PCL HYDRO-HYDRO 8600 26354 29792
MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 10000 30369 32580
ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 19200 56347 36079
KASHANG HEP H P PCL HYDRO-HYDRO 19500 5034 29200
BASPA-II HEP HBPCL HYDRO-HYDRO 30000 132769 13600
KARCHAM WANGTOO HEP HBPCL HYDRO-HYDRO 100000 434386 36600
RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 108000 582600 43700
RITHALA COMBI CY POWER PLANT TATA POWER DDL THERMAL-GAS 9480 000 11900
RAJPURA TPS NABHA POWER LTD THERMAL-GAS 140000 901484 39000
TALWANDI SABO POWER LTD TALWANDI SABO POWER LTD THERMAL-COAL 198000 636040 49548
ROJA THERMAL POWER STATION ROJA POWER SCL THERMAL-COAL 120000 727200 43400
KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 34400 63400
BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 36000 62600
MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 38200 60800
UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 37900 61500
KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 42300 58800
LALITPUR PGCL BAJAJ ENERGY PVT LTD THERMAL-COAL 198000 359400 47300
PRAYAGRAJ PGCL PRAYAGRAJ PGCL THERMAL-COAL 132000 448200 38595
KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 132000 783182 33438
WESTERN REGION
CENTRAL SECTOR
INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 100000 325333 23892
OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 52000 141663 34001
GANDHAR CCPP NTPC LTD THERMAL-GAS 65739 221924 28700
KAWAS CCPP NTPC LTD THERMAL-GASN 65620 167929 27000
KORBA I amp II NTPC LTD THERMAL-COAL 210000 1499171 20500
KORBA III NTPC LTD THERMAL-COAL 50000 358746 26600
SIPAT STPS I NTPC LTD THERMAL-COAL 198000 1479902 26800
SIPAT STPS II NTPC LTD THERMAL-COAL 100000 766549 26500
VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 126000 693142 25800
VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 100000 608781 23800
VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 100000 673475 27600
VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 100000 655924 32900
VINDHYACHAL STPS V NTPC LTD THERMAL-COAL 50000 328265 31700
MOUDA I NTPC LTD THERMAL-COAL 100000 343130 44500
MOUDA Ii NTPC LTD THERMAL-COAL 66000 40637 39900
RATNAGIRI GAS amp POWER PVT LTD RGPPL THERMAL-GAS 196708 442485 47000
KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 000 24729
TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 32000 201227 10740
Page 35
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 365122 19069
TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 787444 29324
STATE SECTOR
GSEG-HAZIRA15610 MW GUJARAT S ENEGEN LTD THERMAL-GAS 15610 1805 28200
GSEG-HAZIRA35143 MW GUJARAT S ENEGEN LTD THERMAL-GAS 35130 22276 51300
GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 21978 51800
AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 13929 26100
KORBA TPS EAST CSPGCL THERMAL-COAL 44000 198673 33880
DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 365808 27570
KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 316500 30420
HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 532878 19410
CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 515 58300
MTTPS CHAMPA U-I CSPGCL THERMAL-COAL 50000 220376 39000
MTTPS CHAMPA U-II CSPGCL THERMAL-COAL 50000 23709 10000
SHP GANGREL CSPGCL HYDRO-HYDRO 1000 2350 36790
BANGO HEP CSPGCL HYDRO-HYDRO 12000 14662 8900
MHP KORBA WEST CSPGCL HYDRO-HYDRO 170 859 38190
SIKASAR HEP CSPGCL HYDRO-HYDRO 700 418 26870
DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8843 74500
DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 19446 51500
GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 66388 71600
GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127488 41300
KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 96072 43900
KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 29841 56400
SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 184966 58800
UKAI 1-5 GSECL THERMAL-COAL 85000 204891 46900
UKAI TPS 6 GSECL THERMAL-COAL 50000 284448 48200
WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 271999 58300
WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 82808 44100
KADANA HPS GSECL HYDRO-HYDRO 24200 34433 16800
UKAI HPS GSECL HYDRO-HYDRO 30500 40585 6100
TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 123000 11500
BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 8900 10900
BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 7200 27500
JHINNA HPS MPPGCL HYDRO-HYDRO 2000 9700 18500
RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 44300 3400
GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 17300 4600
SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 4100 16900
MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 14600 27000
PENCH HPS MPPGCL HYDRO-HYDRO 16000 23700 8100
RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 3000 16900
AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 134400 35100
SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 283800 38700
SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 344600 34300
SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 111600 61600
SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 211800 58000
SSTPS PH-I MPPGCL THERMAL-COAL 120000 233100 84300
BHUSAWAL TPS MSPGCL THERMAL-COAL 142000 566258 51100
CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1365682 33700
KHAPERKHEDA MSPGCL THERMAL-COAL 134000 706207 39100
KORADI TPS MSPGCL THERMAL-COAL 62000 443206 42000
NASIK TPS MSPGCL THERMAL-COAL 63000 297275 47000
PARLI TPS MSPGCL THERMAL-COAL 113000 175934 71600
PARAS MSPGCL THERMAL-COAL 50000 267931 38700
URAN CCPP MSPGCL THERMAL-GAS 67200 320330 30600
KOYANA MSPGCL HYDRO-HYDRO 195600 328155 13100
SMALL HYDRO POWER PLANTS MSPGCL HYDRO-HYDRO 45400 93062 30500
BHIRA MSPGCL HYDRO-HYDRO 8000 10046 8400
TILLARI MSPGCL HYDRO-HYDRO 8900 10584 3100
SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 233298 20500
SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 87633 20500
PRIVATE SECTOR
Page 36
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 81282 46750
JNSTPP(JAYPEE NIGRIE) JP POWER VENTURES LTD THERMAL-COAL 132000 726695 29310
MB POWER MB POWER THERMAL-COAL 120000 345632 38310
ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 754922 28671
ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 780761 23495
ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 198000 1263784 32090
ADANI POWER MAHARA ADANI POWER LTD THERMAL-COAL 330000 1666191 34124
AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 170065 36827
SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 252035 45129
ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 458551 36000
ESSAR POWER MP LTD ESSAR POWER MP LTD THERMAL-COAL 60000 243040 28600
VEDANTA LTD (P P -I) VEDANTA LTD THERMAL-GAS 3000 15044 24000
VEDANTA LTD (P P -II) VEDANTA LTD THERMAL-GAS 3000 21293 24000
PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 8234600 24000
165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 5850 64390
145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 68717 40349
SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 132655 28776
SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 144686 38567
MUNDRA UMPPCOASTAL GUJARAT POWER
LTD THERMAL-IMP COAL 400000 2530300
23900
LANCO AMARKANTAK TPP PATHADIH
U-ILANCO AMARKAN POWER LTD THERMAL-COAL 30000 195500
29200
LANCO AMARKANTAK TPP PATHADIH
U-IILANCO AMARKAN POWER LTD THERMAL-COAL 30000 206900
27600
BARADARHA TPS D B POWER LTD THERMAL-COAL 120000 677373 29200
JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 405000 28900
JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 453000 40500
DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 339437 40700
TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 293400 44000
TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 137200 37000
TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 174900 44000
BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 92900 14100
BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23700 34300
KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 27600 48300
CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2530300 23900
BHANDARDRA HEP -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 2475 54900
SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 161400 26500
SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 445000 39000
SOTHERN REGION
CENTRAL SECTOR
NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 325699 54820
NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 305532 39880
NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 998805 38510
NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 113016 54070
NEYVELI TAMILNADU POWER LTD JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 625274 42200
VALLUR TPS NTPC TECL THERMAL-COAL 150000 856438 42350
R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 1493 84300
RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1502919 29400
RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 341291 31800
SIMHADRI I NTPC LTD THERMAL-COAL 100000 688382 36800
SIMHADRI II NTPC LTD THERMAL-COAL 100000 663657 43400
KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 593110 31324
MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 291625 21764
KKNPP-1 amp 2 NPCIL NUCLEAR-NUCLEAR 200000 572609 40948
MINICOY LAKSHADEEP THERMAL-DIESEL 340 770 29600
KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1097 29600
AMINI LAKSHADEEP THERMAL-DIESEL 265 509 29600
ANDROTT LAKSHADEEP THERMAL-DIESEL 219 524 29600
KALPENI LAKSHADEEP THERMAL-DIESEL 175 356 29600
AGATTI LAKSHADEEP THERMAL-DIESEL 195 658 29600
KADMAT LAKSHADEEP THERMAL-DIESEL 190 414 29600
KILTAN LAKSHADEEP THERMAL-DIESEL 150 269 29600
CHETLET LAKSHADEEP THERMAL-DIESEL 100 139 29600
BITRA LAKSHADEEP THERMAL-DIESEL 043 024 29600
BANGARAM LAKSHADEEP THERMAL-DIESEL 018 009 29600
Page 37
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) STATE SECTOR
Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 721811 46500
Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 50000 336142 46500
RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 237358 46500
RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 239926 46500
RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 124500 46500
SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 62109 46500
UPPER SILERU APGENCO HYDRO-HYDRO 24000 33000 46500
LOWER SILERU APGENCO HYDRO-HYDRO 46000 81066 46500
DONKARAI APGENCO HYDRO-HYDRO 2500 6007 46500
PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 1262 46500
CHETTIPETA APGENCO HYDRO-HYDRO 100 214 46500
MUCHKUND APGENCO HYDRO-HYDRO 12000 37571 46500
NAGARJUNASAGAR RCPH APGENCO HYDRO-HYDRO 9000 606 46500
TUNGABHADRA HES amp HAMPI(AP
Share)
APGENCO HYDRO-HYDRO 7200 6100 46500
KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 352232 42600
KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 288131 32500
KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 319272 46500
RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 40073 44300
KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 308317 46000
KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 308963 51300
SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 61004 76600
NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 17960 75300
PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 20873 58300
POCHAMPAD-I TSPGENCO HYDRO-HYDRO 2700 5455 29800
POCHAMPAD-II TSPGENCO HYDRO-HYDRO 900 1932 40700
NIZAMSAGAR TSPGENCO HYDRO-HYDRO 1000 1126 53400
RAICHUR TPS 1 to 7 KPCL THERMAL-COAL 147000 890866 43800
RAICHUR TPS 8 KPCL THERMAL-COAL 25000 159523 48200
BELLARI TPS 1 KPCL THERMAL-COAL 50000 318679 51100
BELLARI TPS 2 KPCL THERMAL-COAL 50000 232347 55600
BELLARI TPS 3 KPCL THERMAL-COAL 70000 47565 34400
BHADRA PH KPCL HYDRO-HYDRO 3920 2369 45900
GERUSUPPA PH KPCL HYDRO-HYDRO 24000 26990 22000
GHAT PRABHA HEP KPCL HYDRO-HYDRO 3200 4777 25300
KADRA HPS KPCL HYDRO-HYDRO 15000 16889 26800
NAGJHARI KPCL HYDRO-HYDRO 90000 155159 9800
KODASALLI DPH KPCL HYDRO-HYDRO 12000 14854 19200
MUNIRA+MGH+SPH+SPH KPCL HYDRO-HYDRO 22640 48211 7900
SHARAVATHY HPS KPCL HYDRO-HYDRO 108550 276215 5400
ALMATTI DPH KPCL HYDRO-HYDRO 29000 39611 24600
VARAHI UGPH KPCL HYDRO-HYDRO 46000 71368 15600
IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 17196 15300
IDUKKI HPS KSEB HYDRO-HYDRO 78000 137905 15300
KAKKAD HPS KSEB HYDRO-HYDRO 5000 13063 15300
KALLADA HPS KSEB HYDRO-HYDRO 1500 4436 15300
KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 46544 15300
KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 635 15300
LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 30822 15300
MALANKARA HPS KSEB HYDRO-HYDRO 1050 2474 15300
MATTUPETTY KSEB HYDRO-HYDRO 200 230 15300
MALAMPUZHA KSEB HYDRO-HYDRO 250 063 15300
CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 864 15300
URUMI ST I amp II KSEB HYDRO-HYDRO 615 903 15300
LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 248 15300
NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7765 19625 15300
PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 16601 15300
PANNIAR HPS KSEB HYDRO-HYDRO 3240 6217 15300
PORINGALKUTHU KSEB HYDRO-HYDRO 3600 10052 15300
PORINGALKUTHU LBE KSEB HYDRO-HYDRO 1600 9438 15300
PEPPARA KSEB HYDRO-HYDRO 300 395 15300
POOZHITHODE KSEB HYDRO-HYDRO 480 1045 15300
Page 38
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) PEECHI KSEB HYDRO-HYDRO 125 040 15300
RANI-PERUNADU KSEB HYDRO-HYDRO 400 585 15300
SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 79783 15300
SENGULAM HPS KSEB HYDRO-HYDRO 5120 11558 15300
SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 16711 15300
VILANGAD KSEB HYDRO-HYDRO 750 1578 15300
BARAPOLE KSEB HYDRO-HYDRO 1500 1932 15300
VELLATHOOVAL KSEB HYDRO-HYDRO 360 305 15300
CHIM0NY KSEB HYDRO-HYDRO 250 156 15300
ADYANPARA KSEB HYDRO-HYDRO 350 501 15300
BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 554 15300
KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 3801 15300
KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 23132 32800
ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 14416 62280
METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 523970 62280
METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 321270 62280
NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 336575 62280
NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 591240 62280
TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 508966 62280
KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 30897 62280
VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 18720 90699 62280
KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 33593 62280
BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 1047 62280
PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 1250 62280
PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 330 62280
MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 4897 62280
MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 032 62280
KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15681 62280
KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 40608 62280
KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 21342 62280
KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 4717 62280
KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4322 62280
KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2399 62280
METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 4416 62280
METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 8035 62280
BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2187 62280
BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2359 62280
BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2511 62280
BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 1949 62280
BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 1819 62280
POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 172 62280
SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 241 62280
MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 026 62280
THIRUMOORTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 136 62280
PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 9309 62280
VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 353 62280
SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 4192 62280
PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 6571 62280
SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 1186 62280
SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6319 62280
ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 6122 62280
KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 28674 62280
SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 18381 62280
SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 4258 62280
KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 12680 62280
KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4201 62280
ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 000 62280
PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 19175 62280
AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 078 62280
BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 504 62280
BHAVANI KATTALAI (BKB)(IIIampIII BB I amp II)TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 5847 62280
PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 000 62280
Page 39
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) SRI DAMODARAM STPS APPDCL THERMAL-COAL 160000 808108 36300
PRIVATE SECTOR
KARUPPUR TANJORE LANCO TANJORE PCL THERMAL-GAS 12000 48096 28770
SIMHAPURI ENERGY LTD SIMHAPURI ENERGY LTD THERMAL-COAL 60000 143900 39100
JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 7111 45500
SBU 1 JSW ENERGY LTD
VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 26000 159100
43300
SBU 2 JSW ENERGY LTD
VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 60000 247900
42800
LANCO KPLLANCO KONDAPALLI POWER
LTDTHERMAL-GAS 36814 85060
25776
LANCO KPL STG -IILANCO KONDAPALLI POWER
LTDTHERMAL-GAS 36600 12979
46330
LANCO KPL STG -IIIALANCO KONDAPALLI POWER
LTDTHERMAL-GAS 37100 85710
46330
LANCO KPL STG -III BLANCO KONDAPALLI POWER
LTDTHERMAL-GAS 37100 43639
46330
HINDUJA NATIONAL PCL HINDUJA NATIONAL PCL THERMAL-COAL 104000 303000 38200
MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 121164 49940
UDUPI POWER COR LTD ADANI POWER LTD THERMAL-COAL 120000 754613 42500
SPECTRUM POWER GENERATION
LTD SPECTRUM PG LTD THERMAL-GASN 20525 9256812
34952
TAQA NEYVELI POWER COM PVT
LTD TAQA NEYVELI THERMAL-LIG 25000 5840
34500
ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 251000 51000
ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 207860 36800
GMR VEMAGIRI POWER GENERATION
LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 30117
46450
EASTERN REGION
CENTRAL SECTOR
MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 64675 53113
MTPS STAGE - II KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 39000 1432 69138
BOKARO `B` TPS DVC THERMAL-COAL 63000 145670 31539
MEJIA TPS U 1-3 DVC THERMAL-COAL 63000 348298 31552
MEJIA TPS U 4 DVC THERMAL-COAL 21000 116099 34997
MEJIA TPS U 5-6 DVC THERMAL-COAL 50000 276427 35976
MEJIA TPS U 7-8 DVC THERMAL-COAL 100000 552854 36991
DURGAPUR STEEL TPS DVC THERMAL-COAL 100000 665550 39323
DURGAPUR TPS DVC THERMAL-COAL 21000 59270 35416
RAGHUNATHPUR TPS DVC THERMAL-COAL 120000 201650 35326
MAITHON HYDEL STA DVC HYDRO-HYDRO 6320 12200 17984
CHANDRAPURA TPSU1-3 DVC THERMAL-COAL 42000 257610 35095
CHANDRAPURA TPSU7-8 DVC THERMAL-COAL 50000 306673 34987
KODERMA TPS DVC THERMAL-COAL 100000 380180 38131
PANCHET HPS DVC HYDRO-HYDRO 8000 13360 17984
TILLAYA HPS DVC HYDRO-HYDRO 400 1410 17984
RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34700 35400
TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 277300 23200
TLDP -III NHPC LTD HYDRO-HYDRO 13200 55400 62000
TLDP -IV NHPC LTD HYDRO-HYDRO 16000 60300 25600
FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 957219 33700
FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 308943 41000
BONGAINGAON TPS NTPC LTD THERMAL-COAL 25000 153663 58600
KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 542277 34200
KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 942591 34200
BARH-II NTPC LTD THERMAL-COAL 132000 728021 44500
TALCHER TPS NTPC LTD THERMAL-COAL 46000 335521 30100
TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 702319 25600
TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1436521 24700
STATE SECTOR
BTPS(RampM) BIHAR STATE PGCL THERMAL-COAL 22000 12142 39700
BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 98331 10602
HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 50593 9482
CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 19689 2605
RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 53192 6033
UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 147208 14637
Page 40
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 60353 4519
IB TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 288567 25000
J P H GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 210 038 61100
MEYONG CHU GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 400 1086 61100
TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 122667 38200
DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 214339 43321
KOLAGHAT THERMAL POWER
STATION
WEST BENGAL PDCL THERMAL-COAL 126000 538269 31603
BAKRESHWAR THERMAL POWER
PLANT
WEST BENGAL PDCL THERMAL-COAL 105000 634876 32154
BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 45000 166855 33299
SANTHALDIH THERMAL POWER
STATION
WEST BENGAL PDCL THERMAL-COAL 50000 336442 34932
SAGARDIGHI THERMAL POWER
PROJECT
WEST BENGAL PDCL THERMAL-COAL 160000 423121 34705
JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 20344 68900
RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 24559 68900
TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 4623 68900
PURULIA PUMPED STORAGE
PROJECT
WEST BENGAL SEDCL HYDRO-HYDRO 90000 108816 68900
MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2768 68900
PRIVATE SECTOR
CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 49474 20230
CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 555500 70200
HALDIA ENERGY HALDIA ENERGY LTD THERMAL-COAL 60000 371000 50400
DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3688 63400
KAMALANGA TPS GMR KAMALANGA ENERGY LTD THERMAL-COAL 105000547670
33300
ADHUNIK POWER U-1 ADHUNIK POWER THERMAL-COAL 27000 158 44060
ADHUNIK POWER U-2 ADHUNIK POWER THERMAL-COAL 27000 168 44250
VL-JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 332800 23622
JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 43000 45250
JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 71700 37030
JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 70700 35920
JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 71100 38870
JOJOBERA UNIT 5 TATA POWER COM LTD THERMAL-COAL 12000 79300 44560
JOJOBERA UNIT 6 TATA POWER COM LTD THERMAL-WHR 12000 83700 12840
IEL KALINGANAGAR U-I TATA POWER COM LTD THERMAL-WG 6750 33400 22500
IEL KALINGANAGAR U-II TATA POWER COM LTD THERMAL-WG 6750 34800 22500
MAITHON UNIT 1 amp 2 TATA POWER COM LTD THERMAL-COAL 105000 678000 36100
HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 27500 24340
HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 28400 24340
HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 15800 24310
NORTH EASTERN REGION
CENTRAL SECTOR
LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 74100 36600
AGARTALA GT NEEPCO THERMAL-GAS 13500 88611 27210
ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 153111 32310
DOYANG HEP NEEPCO HYDRO-HYDRO 7500 25598 49801
KOPILI HEP NEEPCO HYDRO-HYDRO 20000 98186 11491
KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 19582 20237
KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 10310 17968
RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 124093 22945
TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 10100 17344 39000
STATE SECTOR
HYDRO POWER (122 Stns) ITANAGAR GOVT OF ARUNACHAL
PRADESHHYDRO-HYDRO 6971 6217270
24600
KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39514 17337
LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 82327 36810
NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 33318 48290
MYNTRIANG SHEP ST II ASSAM POWER GENCO HYDRO-HYDRO 300 567 35776
LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 9130 49200
LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 012 49200
DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 022 49200
TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 000 49200
UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 4990 16000
UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 6476 37000
UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 16494 14600
UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 3600 9556 15000
SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 758 8000
MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44070 44800
KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 154 41400
TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 091 41400
MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 411 41400
MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 394 41400
KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 760 41400
SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 3264 41400
LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 044 41400
BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 18953 28000
ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 43585 28200
GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 4080 11100
Note
LIG Lignite N Naptha WHR Waste Heat Recovery
Page 41
File NoCEA-CH-14-1142018-Coordination Division
SN Contents Page
1 Energy Power Supply Position (Provisional) for Oct-2018 and during April 2018- Oct 2018 23
2 Peak Power Supply Position (Provisional) for Oct-2018 and during April 2018- Oct 2018 24
3 Energy Power Supply Position (Revised) for Sep-2018 and during April 2018- Sept 2018 25
4 Peak Power Supply Position (Revised) for Sep-2018 and during April 2018- Sept 2018 26
5 Notified Power cuts Restrictions on Industries during Oct-2018 27
6 Power Supply to Agricultural Sector during Oct-2018 28
Section F - Power supply position
File NoCEA-CH-14-1142018-Coordination Division
आकड़ मममलयन यननट नट Figures in MU net
ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied
कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )
चडीगढ़ Chandigarh 108 108 0 00 1055 1055 0 00
दिलली Delhi 2490 2489 1 00 22524 22510 14 01
हरियजणज Haryana 4554 4554 0 00 35205 35205 0 00
दहमजचल परिश Himachal Pradesh 788 787 2 02 5728 5560 168 29
रमम कशमीि Jammu amp Kashmir 1497 1219 278 186 10982 8865 2117 193
परजब Punjab 4418 4418 0 00 38832 38819 13 00
िजरसथजन Rajasthan 6748 6748 0 00 45341 45181 160 04
उतति परिश Uttar Pradesh 10136 9973 164 16 75485 74808 676 09
उततिजखड Uttarakhand 1083 1081 3 03 8395 8310 85 10
उततरी कषतर Northern Region 31822 31375 447 14 243547 240314 3233 13
छततीसगढ़ Chhattisgarh 2454 2453 1 00 16119 16091 28 02
गरिजत Gujarat 11636 11636 0 00 70782 70768 14 00
मधय परिश Madhya Pradesh 5860 5859 1 00 38412 38410 2 00
महजिजषटर Maharashtra 15223 15095 128 08 95489 95355 134 01
िमन औि दिउ Daman amp Diu 216 216 0 00 1523 1523 0 00
िजिि व नगि हवली Dadra amp Nagar Haveli 553 553 0 00 3757 3757 0 00
गोवज Goa 366 366 0 00 2497 2495 2 01
पशचिमी कषतर Western Region 36308 36178 130 04 228579 228398 180 01
आनधर परिश Andhra Pradesh 5860 5854 6 01 37377 37334 43 01
तलगजनज Telangana 6748 6742 6 01 38251 38205 46 01
कनजाटक Karnataka 5842 5835 7 01 39111 39059 52 01
किल Kerala 2116 2096 20 09 14256 14160 96 07
तममल नजड Tamil Nadu 8611 8601 10 01 65742 65666 76 01
पडचिी Puducherry 216 215 1 05 1654 1646 8 05
लकष-दवीप Lakshadweep 4 4 0 0 27 27 0 0
दकषकषणी कषतर Southern Region 29392 29342 50 02 196390 196069 321 02
बबहजि Bihar 2742 2738 4 01 19143 18951 192 10
िजमोिि घजटी ननगम DVC 1712 1698 13 08 13096 12828 268 20
झजिखणड Jharkhand 701 697 4 06 5022 4949 73 15
ओडडशज Odisha 3147 3134 13 04 20224 20192 32 02
पशशचम बगजल West Bengal 4204 4200 4 01 33008 32881 127 04
मसशककम Sikkim 40 40 0 00 279 279 0 01
अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 67 202 188 13 67
परवी कषतर Eastern Region 12547 12507 40 03 90772 90080 692 08
अरणजचल परिश Arunachal Pradesh 67 66 1 09 502 496 7 13
असम Assam 833 809 24 29 6153 5903 250 41
मणणपि Manipur 72 71 1 10 485 478 7 14
मघजलय Meghalaya 147 147 0 00 1043 1042 0 00
ममज़ोिम Mizoram 63 62 1 08 365 359 5 14
नजगजलड Nagaland 76 67 8 110 540 481 59 109
बिपिज Tripura 130 129 1 09 1025 1007 19 18
उततर-परवी कषतर North-Eastern Region 1387 1351 35 25 10113 9766 346 34
समपणण भारत All India 111455 110753 702 06 769399 764627 4773 06
23
ऊराण वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Energy Power Supply Position Report (Provisional)
राजयStateअकरबर2018 October2018 अपरल2018 -अकरबर2018 April2018 to October2018
ऊरजा पनत ा म कमी ऊरजा पनत ा म कमीEnergy not Supplied
Excludes energy exported to Bangladesh
Energy not Supplied
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
File NoCEA-CH-14-1142018-Coordination Division
अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met
कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )
चडीगढ़ Chandigarh 217 217 0 00 369 369 0 00
दिलली Delhi 4713 4713 0 00 7016 7016 0 00
हरियजणज Haryana 7948 7948 0 00 10270 10270 0 00
दहमजचल परिश Himachal Pradesh 1520 1520 0 00 1520 1520 0 00
रमम कशमीि Jammu amp Kashmir 2836 2269 567 200 2951 2361 590 200
परजब Punjab 7979 7979 0 00 12638 12638 0 00
िजरसथजन Rajasthan 11450 11450 0 00 11698 11698 0 00
उतति परिश Uttar Pradesh 17434 16745 688 39 20498 20062 436 21
उततिजखड Uttarakhand 1943 1943 0 00 2143 2143 0 00
उततरी कषतर Northern Region 50659 49635 1024 20 63166 61726 1440 23
छततीसगढ़ Chhattisgarh 4414 4268 146 33 4414 4268 146 33
गरिजत Gujarat 18148 18130 19 01 18148 18130 19 01
मधय परिश Madhya Pradesh 11356 11317 39 03 11356 11317 39 03
महजिजषटर Maharashtra 23864 23159 705 30 23864 23254 610 26
िमन औि दिउ Daman amp Diu 342 341 1 02 357 356 1 02
िजिि व नगि हवली Dadra amp Nagar Haveli 784 780 4 05 816 815 1 01
गोवज Goa 536 536 0 00 596 596 0 00
पशचिमी कषतर Western Region 56548 55695 853 15 56548 55695 853 15
आनधर परिश Andhra Pradesh 9435 9435 0 00 9435 9435 0 00
तलगजनज Telangana 10603 10603 0 00 10815 10815 0 00
कनजाटक Karnataka 10741 10741 0 00 10741 10741 0 00
किल Kerala 3727 3644 83 22 4050 3997 53 13
तममल नजड Tamil Nadu 14747 14333 414 28 15029 14981 47 03
पडचिी Puducherry 363 362 1 03 420 400 19 46
लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0
दकषकषणी कषतर Southern Region 45279 45226 53 01 45946 45684 262 06
बबहजि Bihar 4945 4945 0 00 5050 5045 5 01
िजमोिि घजटी ननगम DVC 2729 2729 0 00 2874 2874 0 00
झजिखणड Jharkhand 1260 1260 0 00 1339 1284 55 41
ओडडशज Odisha 5624 5224 400 71 5624 5357 268 48
पशशचम बगजल West Bengal 8775 8775 0 00 9130 9123 7 01
मसशककम Sikkim 86 86 0 00 90 90 0 00
अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7
परवी कषतर Eastern Region 22959 22567 392 17 22959 22567 392 17
अरणजचल परिश Arunachal Pradesh 138 125 13 94 138 133 5 37
असम Assam 1785 1704 81 45 1865 1809 56 30
मणणपि Manipur 187 185 2 11 193 186 7 36
मघजलय Meghalaya 336 336 0 00 371 368 2 07
ममज़ोिम Mizoram 99 97 2 20 103 98 4 41
नजगजलड Nagaland 134 131 3 22 156 138 18 117
बिपिज Tripura 269 269 0 00 298 293 5 17
उततर-परवी कषतर North-Eastern Region 2790 2700 90 32 2967 2850 117 39
समपणण भारत All India 172945 170604 2341 14 177022 175528 1494 08
24
अधिकतम वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Peak Power Supply Position Report (Provisional)
आकड़ मगज वजट नट Figures in MW netअपरल2018 -अकरबर2018 April2018 to October2018
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
मजग की पनता म कमी Demand not Met
Excludes the supply to Bangladesh
राजयStateअकरबर2018 October2018
मजग की पनता म कमी Demand not Met
File NoCEA-CH-14-1142018-Coordination Division
आकड़ मममलयन यननट नट Figures in MU net
ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied
कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )
चडीगढ़ Chandigarh 141 141 0 00 947 947 0 00
दिलली Delhi 2925 2924 1 00 20034 20021 13 01
हरियजणज Haryana 4794 4794 0 00 30651 30651 0 00
दहमजचल परिश Himachal Pradesh 876 853 24 27 4940 4773 167 34
रमम कशमीि Jammu amp Kashmir 1520 1246 274 180 9485 7646 1839 194
परजब Punjab 5575 5575 0 00 34414 34401 13 00
िजरसथजन Rajasthan 6202 6201 0 00 38594 38434 160 04
उतति परिश Uttar Pradesh 10211 10124 86 08 65349 64836 513 08
उततिजखड Uttarakhand 1162 1149 13 11 7311 7229 82 11
उततरी कषतर Northern Region 33405 33008 398 12 211725 208939 2786 13
छततीसगढ़ Chhattisgarh 2403 2388 15 06 13665 13638 27 02
गरिजत Gujarat 10122 10122 0 00 59146 59132 14 00
मधय परिश Madhya Pradesh 5492 5491 1 00 32552 32551 1 00
महजिजषटर Maharashtra 13615 13612 3 00 80266 80260 6 00
िमन औि दिउ Daman amp Diu 221 221 0 00 1306 1306 0 00
िजिि व नगि हवली Dadra amp Nagar Haveli 551 551 0 00 3204 3204 0 00
गोवज Goa 339 339 0 00 2131 2128 2 01
पशचिमी कषतर Western Region 32742 32723 19 01 192270 192220 50 00
आनधर परिश Andhra Pradesh 5294 5287 7 01 31518 31480 37 01
तलगजनज Telangana 6279 6272 8 01 31503 31463 40 01
कनजाटक Karnataka 5701 5693 8 01 33269 33225 45 01
किल Kerala 2050 2026 24 12 12140 12063 76 06
तममल नजड Tamil Nadu 8971 8959 12 01 57131 57065 66 01
पडचिी Puducherry 226 224 2 08 1438 1431 7 05
लकष-दवीप Lakshadweep 4 4 0 0 23 23 0 0
दकषकषणी कषतर Southern Region 28520 28460 60 02 166998 166727 271 02
बबहजि Bihar 2839 2793 46 16 16400 16213 188 11
िजमोिि घजटी ननगम DVC 1901 1750 151 79 11384 11130 254 22
झजिखणड Jharkhand 740 723 17 22 4321 4252 69 16
ओडडशज Odisha 2921 2918 3 01 17077 17058 19 01
पशशचम बगजल West Bengal 4902 4879 23 05 28804 28681 123 04
मसशककम Sikkim 39 39 0 01 239 239 0 01
अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 67 173 162 12 67
परवी कषतर Eastern Region 13341 13102 240 18 78225 77573 652 08
अरणजचल परिश Arunachal Pradesh 74 73 1 10 435 429 6 14
असम Assam 950 914 36 38 5320 5094 226 43
मणणपि Manipur 70 69 1 11 414 408 6 15
मघजलय Meghalaya 150 150 0 01 896 896 0 01
ममज़ोिम Mizoram 58 57 1 12 302 297 5 16
नजगजलड Nagaland 80 72 8 104 464 414 50 108
बिपिज Tripura 192 191 1 07 895 878 17 19
उततर-परवी कषतर North-Eastern Region 1575 1527 48 31 8726 8415 311 36
समपणण भारत All India 109584 108819 765 07 657944 653873 4071 06
Energy not Supplied Energy not Supplied
ससतबर2018 September2018 अपरल2018 -ससतबर2018 April2018 to September2018
ऊरजा पनत ा म कमी ऊरजा पनत ा म कमी
Excludes energy exported to Bangladesh
राजयState
ऊराण वरवदयत आपरतण शथिरत ररपोरण (सशोधित) Energy Power Supply Position Report (Revised)
25
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
File NoCEA-CH-14-1142018-Coordination Division
अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met
कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )
चडीगढ़ Chandigarh 293 293 0 00 369 369 0 00
दिलली Delhi 5358 5358 0 00 7016 7016 0 00
हरियजणज Haryana 9008 9008 0 00 10270 10270 0 00
दहमजचल परिश Himachal Pradesh 1466 1466 0 00 1479 1479 0 00
रमम कशमीि Jammu amp Kashmir 2951 2361 590 200 2951 2361 590 200
परजब Punjab 11405 11405 0 00 12638 12638 0 00
िजरसथजन Rajasthan 10612 10612 0 00 11698 11698 0 00
उतति परिश Uttar Pradesh 18346 18121 225 12 20498 20062 436 21
उततिजखड Uttarakhand 1996 1996 0 00 2143 2143 0 00
उततरी कषतर Northern Region 56407 55649 758 13 63166 61726 1440 23
छततीसगढ़ Chhattisgarh 4404 4075 328 75 4404 4136 268 61
गरिजत Gujarat 16963 16963 0 00 17053 16963 90 05
मधय परिश Madhya Pradesh 8811 8771 41 05 8811 8775 36 04
महजिजषटर Maharashtra 22455 22349 106 05 23395 23254 141 06
िमन औि दिउ Daman amp Diu 357 356 1 02 357 356 1 02
िजिि व नगि हवली Dadra amp Nagar Haveli 816 815 1 01 816 815 1 01
गोवज Goa 596 596 0 00 596 596 0 00
पशचिमी कषतर Western Region 52933 52895 38 01 53841 52895 945 18
आनधर परिश Andhra Pradesh 9435 9416 19 02 9435 9416 19 02
तलगजनज Telangana 10815 10815 0 00 10815 10815 0 00
कनजाटक Karnataka 10103 10090 13 01 10690 10688 2 00
किल Kerala 3888 3638 251 64 4050 3997 53 13
तममल नजड Tamil Nadu 14556 14553 3 00 15029 14981 47 03
पडचिी Puducherry 390 372 17 45 420 400 19 46
लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0
दकषकषणी कषतर Southern Region 45542 45428 114 02 45946 45684 262 06
बबहजि Bihar 5050 5045 5 01 5050 5045 5 01
िजमोिि घजटी ननगम DVC 2641 2641 0 00 2874 2874 0 00
झजिखणड Jharkhand 1233 1233 0 00 1339 1284 55 41
ओडडशज Odisha 4906 4906 0 00 5357 5357 0 00
पशशचम बगजल West Bengal 8644 8639 5 01 9130 9123 7 01
मसशककम Sikkim 78 78 0 00 90 90 0 00
अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7
परवी कषतर Eastern Region 22110 22100 10 00 22470 22290 180 08
अरणजचल परिश Arunachal Pradesh 132 130 2 15 138 133 5 37
असम Assam 1865 1809 56 30 1865 1809 56 30
मणणपि Manipur 184 182 2 13 193 186 7 36
मघजलय Meghalaya 317 317 0 00 371 368 2 07
ममज़ोिम Mizoram 95 93 2 23 103 98 4 41
नजगजलड Nagaland 142 138 5 32 156 138 18 117
बिपिज Tripura 296 293 3 10 298 293 5 17
उततर-परवी कषतर North-Eastern Region 2921 2850 71 24 2967 2850 117 39
समपणण भारत All India 177022 175528 1494 08 177022 175528 1494 08
26
मजग की पनता म कमी मजग की पनता म कमी Demand not MetDemand not Met
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
Excludes the supply to Bangladesh
अधिकतम वरवदयत आपरतण शथिरत ररपोरण (सशोधित) Peak Power Supply Position Report (Revised)
आकड़ मगज वजट नट Figures in MW net
राजयStateससतबर2018 September2018 अपरल2018 -ससतबर2018 April2018 to September2018
File NoCEA-CH-14-1142018-Coordination Division
अकरबर2018 October2018अपरल2018 -अकरबर2018 April2018 to October2018
उततरी कषतर Northern Region
चडीगढ़ Chandigarh Data not received Data not received
दिलली Delhi
हरियजणज Haryana
दहमजचल परिश Himachal Pradesh
रमम कशमीि Jammu amp Kashmir Data not received Data not received
परजब Punjab
िजरसथजन Rajasthanउतति परिश Uttar Pradesh
उततिजखड Uttarakhand
पशचिमी कषतर Western Region
छततीसगढ़ Chhattisgarh
गरिजत Gujarat
मधय परिश Madhya Pradesh
महजिजषटर Maharashtra
गोवज Goa
दकषकषणी कषतर Southern Region
आनधर परिश Andhra Pradesh
तलगजनज Telangana
कनजाटक Karnataka
किल Kerala
तममल नजड Tamil Nadu
पडचिी Puducherryपरवी कषतर Eastern Region
बबहजि Bihar
झजिखणड Jharkhand
ओडडशज Odisha
पशशचम बगजल West Bengal
N
o No
tified
Cuts
N
o No
tified
Cuts
27
अकरबर 2018 म इडथरीर पर वरवदयत करौती का वरवरवरण Notified Power CutsRestrictions on Industries during October2018
राजय कषतर State Regionऊराणमाग करौती EnergyDemand Cut
No Notified Cuts No Notified Cuts
File NoCEA-CH-14-1142018-Coordination Division
अकरबर2018 October2018अपरल2018 -अकरबर2018 April2018 to October2018
उततरी कषतर Northern Region
चडीगढ़ Chandigarh Data not received Data not received
दिलली Delhi Data not received Data not received
हरियजणज Haryana 940 hrsday 0709 - 0950 hrsday
दहमजचल परिश Himachal Pradesh No cut imposed on agriculture consumers and uninterrupted
power is being supplied to agriculture sector
HPSEBL has only 2 agriculture consumers and uninterrupted
power is being supplied to agriculture sector
रमम कशमीि Jammu amp Kashmir Data not received Data not received
परजब Punjab 0507 hrsday 0349 - 0844 hrsday
िजरसथजन Rajasthan 0630 hrsday 0630 hrsday
उतति परिश Uttar Pradesh 1825 hrsday 1814 - 1858 hrsday
उततिजखड Uttarakhand 2350 hrsday 2128 - 2357 hrsday
पशचिमी कषतर Western Region
छततीसगढ़ Chhattisgarh 18hoursday 18 hrsday
गरिजत Gujarat 805 hrsday 805 hrsday
मधय परिश Madhya Pradesh Three-Phase Supply(Irrigation)-947 hrs day
Three-Phase (Mixed) Supply - 2311 hrs day
Three-Phase Supply(Irrigation)- 0933 - 0947 hrs day Three-
Phase (Mixed) Supply - 2300 - 2320 hrs day
महजिजषटर Maharashtra Three-Phase Supply(Irrigation)- 9 hrs day
Three-Phase (Mixed) Supply - 24 hrs day
Three-Phase Supply(Irrigation)- 9 hrs day
Three-Phase (Mixed) Supply - 24 hrs day
गोवज Goa No restriction No restriction
दकषकषणी कषतर Southern Region
आनधर परिश Andhra Pradesh 07 hrsday 07 hrsday
तलगजनज Telangana 24 hoursday 24 hoursday
कनजाटक Karnataka 6 hrsday 6 hrsday
किल Kerala No Restrictions No Restrictions
तममल नजड Tamil Nadu 9 hrsday (6 hrs during day time and 3 hrs during night time) 9 hrsday (6 hrs during day time and 3 hrs during night time)
पडचिी Puducherry No Restrictions No Restrictions
परवी कषतर Eastern Region
बबहजि Bihar About 18 hrsday About 18 hrsday
झजिखणड Jharkhand About 20 hrsday About 20 hrsday
ओडडशज Odisha 24 hrsday 24 hrsday
पशशचम बगजल West Bengal About 23 hrsday About 23 hrsday
28
अकटबर 2018 कषि कषतर को षिदयत आपरति का षििरण Power Supply to Agricultural Sector during October2018
राजय कषतर State Regionऔसत वरवदयत आपरतण घनरो म Average Hours of Supply
On segregated feeders
File NoCEA-CH-14-1142018-Coordination Division
SNo Contents Page
1 Growth of Installed Capacity since 6th Plan 29
2 Progress of Transmission Sector since 6th Plan 30
3 All India Yearly Coal consumption for Power Generation (Utilities)
4 All India Annual Per Capita Consumption of Electricity since -2006
5 Average cost of power supply amp Average realisation (Paisakwh)
6 Growth of Rural Electrification amp Pump Sets Energisation
7 Status of Hydro Schemes Cleared by the CEA in Oct-2018
Section G - Growth of Power Sector
31
32
File NoCEA-CH-14-1142018-Coordination Division
(In MW)
Coal Gas Diesel Total
End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472
End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634
End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537
End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596
End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921
End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703
End of 12th Plan 19216288 2532938 83763 21832988 6780 4447842 50018 31960630
Up to Oct-2018 19599250 2493722 837629 22176734 6780 4548742 7201281 34604757
Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-17) = 51529 MW
Electricity Generation (MU) Targets and Achievements for 2016-17
Coal Gas Diesel Nuclear Hydro Res Total
1959925 2493722 837629 678000 454874 72012805 22925174
29
1 Growth of Installed Capacity Since 6th Plan
Plan YearThermal
Nuclear Hydro RES (MNRE) Total
Total Installed Capacity 34604757 MW
Coal Gas Diesel Nuclear Hydro Res
File NoCEA-CH-14-1142018-Coordination Division
Progress of Transmission Sector in the Country up to Oct 2018
1 TRANSMISSION LINES (All fig in CKM)
At the end of
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
6th plan 0 0 0 0 0 0 0 0 0 0 0 0 1831 4198 0 6029 1641 44364 0 46005 3472 48562 0 52034
7th plan 0 0 0 0 0 0 0 0 0 0 0 0 13068 6756 0 19824 4560 55071 0 59631 17628 61827 0 79455
8th plan 0 0 0 0 1634 0 0 1634 0 0 0 0 23001 13141 0 36142 6564 73036 0 79600 31199 86177 0 117376
9th plan 0 0 0 0 3234 1504 0 4738 751 409 0 1160 29345 20033 0 49378 8687 88306 0 96993 42017 110252 0 152269
10th plan 0 0 0 0 4368 1504 0 5872 1775 409 0 2184 48708 24730 0 73438 9444 105185 0 114629 64295 131828 0 196123
11th Plan 0 0 0 0 5948 1504 1980 9432 4839 411 0 5250 71023 30191 5605 106819 10140 125010 830 135980 91950 157116 8415 257481
12th Plan 6124 0 0 6124 5948 1504 1980 9432 25465 1177 4598 31240 92482 48240 17065 157787 11014 151276 978 163268 141033 202197 24621 367851
13th Plan (Up
to Mar2018)6124 0 0 6124 5948 1504 1980 9432 28666 1512 4881 35059 98247 54286 19067 171600 11258 156497 1000 168755 150243 213799 26928 390970
13th Plan (Up
to Sep-18)6124 0 0 6124 5948 1504 1980 9432 30952 1512 5059 37523 99683 56069 20662 176414 11318 160958 1000 173276 154025 220043 28701 402769
27150
75050
47900
118050
90650
30
IR addition in 12th Plan (up to
March 2017)
Total IR (up to Oct-18)
IR at the end of 11th Plan
IR at the end of 12th Plan
Envisaged IR Capacity at the end
of 13th Plan
Grand Total
Note - The figure upto the end of 10th plan in for stringing progress including the lines not commissioned Now only commissioned lines are reckoned Accordingly the figure for 10th plan (end) may read as 187555 after adjusting with (-) 10852 Ckm
Inter-regional Power Transfer Capacity
plusmn 800 kV HVDC plusmn 500 kV HVDC 765 kV 400 kV 220 kV
File NoCEA-CH-14-1142018-Coordination Division
2004-05 27800
2005-06 28100
2006-07 30200
2007-08 33000
2008-09 35500
2009-10 36700
2010-11 38700
2011-12 41756
2012-13 45460
2013-14 48940
2014-15 53040
2015-16 54590
2016-17 57430
2017-18 60800
Year
2005-06
2006-07
2007-08
2008-09
2009-10
2010-11
2011-12
2012-13
2013-14
2014-15
2015-16
2016-17
2017-18
2004-05 254 209 7568
2005-06 260 221 7636
2006-07 276 227 7423
2007-08 293 239 7727
2008-09 340 263 8713
2009-10 355 268 8870
2010-11 398 303 11975
2011-12 455 330 13514
2012-13 501 376 14867
2013-14 518 175
2014-15 520
6719
7171
3 All India yearly Coal Consumption for Power Generation (Utilities)
YEARCoal Consumption
Million Tonnes
4 All India Annual per Capita consumption of Electricity Since 2006
Per Capita Consumption ( kWh)
6314
(GrossGen+ Net Import) Mid-year population
5 Average cost of power supply amp average realization ( paiseKWH )
Yearcost of supply
(paiseunit)
Realization(paiseunit)
Including AgricultureOnly
Agriculture
1149
7335
7786
91441
8188
88363
957
1010
1075
1122
File NoCEA-CH-14-1142018-Coordination Division
Source- PFC Reports on the performance of State Power Utilities 31
File NoCEA-CH-14-1142018-Coordination Division
Sl
NoExecuting Agency
Installed
Capacity (MW)Cost (Rs crore)
Date of
Clearance
32
No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification
since 2004-05
65291374575 296361511th Plan
Cumu upto End of 11th Plan
596556 21212860
557439Cummulative up to end of 12th Plan
46708
18423975
499150
2003-042004-05
5743
9769
Cumu upto End of 10th Plan
010407 to 310308
010410 to 310311557976840909
010411 to 310312
412667
86293726
3207
482864
12632
1576036
4451722594
15455554
2314176
397343611750
2093311060316074
65109527813884
6 Growth Of Rural Electrification amp Pumpsets Energisation
Plan Year
9th Plan2002-03
134092626
4111
Pump Sets Energised Villages Electricfied (Nos)
2001-02
284064367244
1218
27801997-981998-991999-002000-01
297594
010408 to 310309010409 to 310310
10th Plan
2005-062006-07
322968331020
Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as
Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received
from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made
available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified
villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is
independent of the earlier published reports
No Hydro Electric Project has been issued concurrenceAppraisal letter by CEA during October 2018
7 Status of Hydro Schemes Cleared by the CEA in Oct-2018
Name of Scheme
File NoCEA-CH-14-1142018-Coordination Division
SN Contents Page
1 Rate of sale of power for the year 2016-17 33-41
RATE OF SALE OF POWER FOR THE YEAR 2016-17
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) NORTHERN REGION
CENTRAL SECTOR
BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 18000 66900 19800
CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 54000 222400 21600
CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 30000 144400 19600
CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 23100 91700 42600
PARBATI - III HPS NHPC LTD HYDRO-HYDRO 52000 68200 54800
DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 28000 95600 30000
CHUTAK NHPC LTD HYDRO-HYDRO 4400 22000 79800
DULHASTI HPS NHPC LTD HYDRO-HYDRO 39000 228000 56400
SALAL HPS NHPC LTD HYDRO-HYDRO 69000 342300 11000
TANAKPUR HPS NHPC LTD HYDRO-HYDRO 9420 43000 29600
URI HPS -I NHPC LTD HYDRO-HYDRO 48000 280300 16000
URI HPS - II NHPC LTD HYDRO-HYDRO 24000 147300 48600
NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 4500 24600 88200
SEWA - II NHPC LTD HYDRO-HYDRO 12000 47100 43400
ANTA CCPP NTPC LTD THERMAL-GASN 41930 67539 32400
AURAIYA CCPP NTPC LTD THERMAL-GASN 66336 53501 39100
BADARPUR TPS NTPC LTD THERMAL-COAL 70500 159153 44800
DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 84000 296170 42300
DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 98000 526686 46300
DADRI CCPP NTPC LTD THERMAL-GASHSD 82978 227469 33000
FARIDABAD CCPP NTPC LTD THERMAL-GASN 43159 115577 30800
RIHAND STPS I NTPC LTD THERMAL-COAL 100000 596766 24500
RIHAND STPS II NTPC LTD THERMAL-COAL 100000 737069 24600
RIHAND STPS III NTPC LTD THERMAL-COAL 100000 706546 30600
SINGRAULI STPS NTPC LTD THERMAL-COAL 200000 1394068 20400
TANDA TPS NTPC LTD THERMAL-COAL 44000 295438 40800
UNCHAHAR TPS I NTPC LTD THERMAL-COAL 42000 256454 39800
UNCHAHAR TPS II NTPC LTD THERMAL-COAL 42000 273577 38900
UNCHAHAR TPS III NTPC LTD THERMAL-COAL 21000 142780 43000
KOLDAM NTPC LTD HYDRO-HYDRO 80000 363260 43600
NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 303575 25841
RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 108000 668677 35374
NJHPS SJVNL HYDRO-HYDRO 150000 699496 23820
RAMPUR HPS SJVNL HYDRO-HYDRO 41202 195982 32260
TEHRI HPP THDC HYDRO-HYDRO 100000 272543 51800
KOTESHWAR HEP THDC HYDRO-HYDRO 40000 106244 53400
IGSTPS JHAJJAR ARAVALI P CPL THERMAL-COAL 150000 510429 49490
NEYVELI BARSINGSAR NEYVELI LIG CORP LTD THERMAL-LIG 25000 127520 38040
STATE SECTOR
PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 21000 14222 48200
PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 21000 19205 48400
PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 25000 102257 42600
PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 25000 62107 41800
DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 60000 312213 41000
RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 120000 35767442200
WYC HYDEL STATION HPGCL HYDRO-HYDRO 6240 20365 24900
GIRI POWER HOUSE HPSEB HYDRO-HYDRO 6000 13958 7600
ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 1695 5467 11900
BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 12000 18528 6700
GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 2250 7462 22500
BASSI POWER HOUSE HPSEB HYDRO-HYDRO 6600 29649 7500
BINWA POWER HOUSE HPSEB HYDRO-HYDRO 600 2749 19300
ANNEXURE-I
RATE OF SALE OF POWER FOR THE YEAR 2016-2017
Page 33
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) GAJ POWER HOUSE HPSEB HYDRO-HYDRO 1050 2914 26700
BANER POWER HOUSE HPSEB HYDRO-HYDRO 1200 2864 16200
HOLI POWER HOUSE HPSEB HYDRO-HYDRO 300 616 22500
THIROT POWER HOUSE HPSEB HYDRO-HYDRO 450 1126 22500
KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 1200 3064 22500
LARJI POWER HOUSE HPSEB HYDRO-HYDRO 12600 53677 23700
NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 250 750 31000
CHABA POWER HOUSE HPSEB HYDRO-HYDRO 175 465 23300
RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 150 101 13400
SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 200 000 22500
KILLAR HPSEB HYDRO-HYDRO 030 050 22500
BHABA AUGUMENP H HPSEB HYDRO-HYDRO 450 1276 22500
BS CHAMBA HPSEB HYDRO-HYDRO 045 099 19500
GUMMA HPSEB HYDRO-HYDRO 300 423 22500
GAS TURBINE POWER STATION IPGCL THERMAL-GAS 27000 67233 39300
PPS-I PPCL THERMAL-GAS 33000 175905 38300
PPS-III PPCL THERMAL-GAS 137120 196879 36100
LOWER JHELUM JampKPDD HYDRO-HYDRO 10500 60214 5100
UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 2260 10514 6300
UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 10500 44202 8500
GANDHARBAL JampKPDD HYDRO-HYDRO 1500 8925 4700
KARNAH MPH JampKPDD HYDRO-HYDRO 200 1122 31000
CHENANI I JampKPDD HYDRO-HYDRO 2330 10892 6600
CHENANI II JampKPDD HYDRO-HYDRO 200 1188 9300
CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 750 3634 14200
IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 375 2108 18500
IGO MERCHELLONG JampKPDD HYDRO-HYDRO 300 1572 29700
PAHALGAM MHP JampKPDD HYDRO-HYDRO 450 1713 32900
MARPACHOO JampKPDD HYDRO-HYDRO 075 375 29800
HAFTAL JampKPDD HYDRO-HYDRO 100 483 28700
SANJAK JampKPDD HYDRO-HYDRO 126 441 36000
SEWA-III JampKPDD HYDRO-HYDRO 900 3273 20200
BHADERWAH JampKPDD HYDRO-HYDRO 150 935 8900
BAZGO JampKPDD HYDRO-HYDRO 030 108 33300
SUMOOR JampKPDD HYDRO-HYDRO 010 045 35400
HUNDER JampKPDD HYDRO-HYDRO 040 176 26200
STAKNA JampKPDD HYDRO-HYDRO 400 1933 4100
KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 124000 662879 31360
SURATGARH TPS RRVUNL THERMAL-COAL 150000 402328 41730
CHHABRA TPS 1amp 2 RRVUNL THERMAL-COAL 50000 305946 36700
CHHABRA TPS 3 RRVUNL THERMAL-COAL 25000 151536 36700
CHHABRA TPS 4 RRVUNL THERMAL-COAL 25000 155896 36700
RAMGARH GT POWER PROJECT RRVUNL THERMAL-COAL 22050 43177 41800
RAMGARH GAS T P PROJECT 3 RRVUNL THERMAL-GAS 5000 93615 41800
DHOLPUR C C POWER PROJECT RRVUNL THERMAL-R-LNG 33000 9486 46110
MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 14000 20855 34192
MINI MICRO HYDEL (MMH) P S RRVUNL HYDRO-HYDRO 2385 851 37800
KALISINDH TPP 1 RRVUNL THERMAL-COAL 60000 341543 45000
KALISINDH TPP 2 RRVUNL THERMAL-COAL 60000 211588 45000
KHARA HEP UPJVNL HYDRO-HYDRO 7200 26654 7200
MATATILLA HEP UPJVNL HYDRO-HYDRO 3060 12219 6500
OBRA HEP UPJVNL HYDRO-HYDRO 9900 21517 6300
RIHAND UPJVNL HYDRO-HYDRO 30000 57369 5500
ANPARA A TPS UPRVUNL THERMAL-COAL 63000 317536 27000
ANPARA B TPS UPRVUNL THERMAL-COAL 100000 705605 22700
ANPARA D UPRVUNL THERMAL-COAL 100000 300158 39800
HARDUAGANJ TPS UPRVUNL THERMAL-COAL 16500 45817 49200
HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 50000 304389 46600
OBRA A TPS UPRVUNL THERMAL-COAL 28800 13158 34000
OBRA B TPS UPRVUNL THERMAL-COAL 100000 328124 21900
Page 34
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) PANKI TPS UPRVUNL THERMAL-COAL 21000 66488 50300
PARICHHA TPS UPRVUNL THERMAL-COAL 22000 38762 49400
PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 42000 231931 45600
PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 50000 276722 50400
CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 24000 70845 8290
CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 14400 75366 8390
DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 3375 9595 12080
DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 5100 18701 10520
KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4140 17359 12330
KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 12000 33001 9420
KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 3000 11953 8320
TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 9000 33983 12460
MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 30400 124510 16110
RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 19800 17897 10550
MPUR UTTARAKHAND JVNL HYDRO-HYDRO 930 5121 19200
PATHRI UTTARAKHAND JVNL HYDRO-HYDRO 2040 11636 14200
GALOGI UTTARAKHAND JVNL HYDRO-HYDRO 300 648 12500
PRIVATE SECTOR
MGTPP CLP INDIA PVT LTD THERMAL-COAL 132000 268902 41940
SHRINAGAR HEP ALAKNANDA HPCL HYDRO-HYDRO 33000 127414 48800
GAMA INFRAPROP CCPP GAMA INFRAPROP PVT THERMAL-GAS 22500 52686 47000
PPGCL (BARA) JP POWER VENTURES LTD THERMAL-COAL 198000 448200 38500
MALANA HEP MALANA PCL HYDRO-HYDRO 8600 26354 29792
MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 10000 30369 32580
ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 19200 56347 36079
KASHANG HEP H P PCL HYDRO-HYDRO 19500 5034 29200
BASPA-II HEP HBPCL HYDRO-HYDRO 30000 132769 13600
KARCHAM WANGTOO HEP HBPCL HYDRO-HYDRO 100000 434386 36600
RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 108000 582600 43700
RITHALA COMBI CY POWER PLANT TATA POWER DDL THERMAL-GAS 9480 000 11900
RAJPURA TPS NABHA POWER LTD THERMAL-GAS 140000 901484 39000
TALWANDI SABO POWER LTD TALWANDI SABO POWER LTD THERMAL-COAL 198000 636040 49548
ROJA THERMAL POWER STATION ROJA POWER SCL THERMAL-COAL 120000 727200 43400
KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 34400 63400
BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 36000 62600
MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 38200 60800
UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 37900 61500
KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 42300 58800
LALITPUR PGCL BAJAJ ENERGY PVT LTD THERMAL-COAL 198000 359400 47300
PRAYAGRAJ PGCL PRAYAGRAJ PGCL THERMAL-COAL 132000 448200 38595
KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 132000 783182 33438
WESTERN REGION
CENTRAL SECTOR
INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 100000 325333 23892
OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 52000 141663 34001
GANDHAR CCPP NTPC LTD THERMAL-GAS 65739 221924 28700
KAWAS CCPP NTPC LTD THERMAL-GASN 65620 167929 27000
KORBA I amp II NTPC LTD THERMAL-COAL 210000 1499171 20500
KORBA III NTPC LTD THERMAL-COAL 50000 358746 26600
SIPAT STPS I NTPC LTD THERMAL-COAL 198000 1479902 26800
SIPAT STPS II NTPC LTD THERMAL-COAL 100000 766549 26500
VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 126000 693142 25800
VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 100000 608781 23800
VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 100000 673475 27600
VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 100000 655924 32900
VINDHYACHAL STPS V NTPC LTD THERMAL-COAL 50000 328265 31700
MOUDA I NTPC LTD THERMAL-COAL 100000 343130 44500
MOUDA Ii NTPC LTD THERMAL-COAL 66000 40637 39900
RATNAGIRI GAS amp POWER PVT LTD RGPPL THERMAL-GAS 196708 442485 47000
KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 000 24729
TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 32000 201227 10740
Page 35
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 365122 19069
TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 787444 29324
STATE SECTOR
GSEG-HAZIRA15610 MW GUJARAT S ENEGEN LTD THERMAL-GAS 15610 1805 28200
GSEG-HAZIRA35143 MW GUJARAT S ENEGEN LTD THERMAL-GAS 35130 22276 51300
GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 21978 51800
AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 13929 26100
KORBA TPS EAST CSPGCL THERMAL-COAL 44000 198673 33880
DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 365808 27570
KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 316500 30420
HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 532878 19410
CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 515 58300
MTTPS CHAMPA U-I CSPGCL THERMAL-COAL 50000 220376 39000
MTTPS CHAMPA U-II CSPGCL THERMAL-COAL 50000 23709 10000
SHP GANGREL CSPGCL HYDRO-HYDRO 1000 2350 36790
BANGO HEP CSPGCL HYDRO-HYDRO 12000 14662 8900
MHP KORBA WEST CSPGCL HYDRO-HYDRO 170 859 38190
SIKASAR HEP CSPGCL HYDRO-HYDRO 700 418 26870
DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8843 74500
DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 19446 51500
GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 66388 71600
GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127488 41300
KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 96072 43900
KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 29841 56400
SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 184966 58800
UKAI 1-5 GSECL THERMAL-COAL 85000 204891 46900
UKAI TPS 6 GSECL THERMAL-COAL 50000 284448 48200
WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 271999 58300
WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 82808 44100
KADANA HPS GSECL HYDRO-HYDRO 24200 34433 16800
UKAI HPS GSECL HYDRO-HYDRO 30500 40585 6100
TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 123000 11500
BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 8900 10900
BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 7200 27500
JHINNA HPS MPPGCL HYDRO-HYDRO 2000 9700 18500
RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 44300 3400
GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 17300 4600
SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 4100 16900
MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 14600 27000
PENCH HPS MPPGCL HYDRO-HYDRO 16000 23700 8100
RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 3000 16900
AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 134400 35100
SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 283800 38700
SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 344600 34300
SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 111600 61600
SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 211800 58000
SSTPS PH-I MPPGCL THERMAL-COAL 120000 233100 84300
BHUSAWAL TPS MSPGCL THERMAL-COAL 142000 566258 51100
CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1365682 33700
KHAPERKHEDA MSPGCL THERMAL-COAL 134000 706207 39100
KORADI TPS MSPGCL THERMAL-COAL 62000 443206 42000
NASIK TPS MSPGCL THERMAL-COAL 63000 297275 47000
PARLI TPS MSPGCL THERMAL-COAL 113000 175934 71600
PARAS MSPGCL THERMAL-COAL 50000 267931 38700
URAN CCPP MSPGCL THERMAL-GAS 67200 320330 30600
KOYANA MSPGCL HYDRO-HYDRO 195600 328155 13100
SMALL HYDRO POWER PLANTS MSPGCL HYDRO-HYDRO 45400 93062 30500
BHIRA MSPGCL HYDRO-HYDRO 8000 10046 8400
TILLARI MSPGCL HYDRO-HYDRO 8900 10584 3100
SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 233298 20500
SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 87633 20500
PRIVATE SECTOR
Page 36
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 81282 46750
JNSTPP(JAYPEE NIGRIE) JP POWER VENTURES LTD THERMAL-COAL 132000 726695 29310
MB POWER MB POWER THERMAL-COAL 120000 345632 38310
ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 754922 28671
ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 780761 23495
ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 198000 1263784 32090
ADANI POWER MAHARA ADANI POWER LTD THERMAL-COAL 330000 1666191 34124
AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 170065 36827
SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 252035 45129
ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 458551 36000
ESSAR POWER MP LTD ESSAR POWER MP LTD THERMAL-COAL 60000 243040 28600
VEDANTA LTD (P P -I) VEDANTA LTD THERMAL-GAS 3000 15044 24000
VEDANTA LTD (P P -II) VEDANTA LTD THERMAL-GAS 3000 21293 24000
PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 8234600 24000
165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 5850 64390
145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 68717 40349
SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 132655 28776
SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 144686 38567
MUNDRA UMPPCOASTAL GUJARAT POWER
LTD THERMAL-IMP COAL 400000 2530300
23900
LANCO AMARKANTAK TPP PATHADIH
U-ILANCO AMARKAN POWER LTD THERMAL-COAL 30000 195500
29200
LANCO AMARKANTAK TPP PATHADIH
U-IILANCO AMARKAN POWER LTD THERMAL-COAL 30000 206900
27600
BARADARHA TPS D B POWER LTD THERMAL-COAL 120000 677373 29200
JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 405000 28900
JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 453000 40500
DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 339437 40700
TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 293400 44000
TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 137200 37000
TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 174900 44000
BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 92900 14100
BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23700 34300
KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 27600 48300
CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2530300 23900
BHANDARDRA HEP -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 2475 54900
SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 161400 26500
SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 445000 39000
SOTHERN REGION
CENTRAL SECTOR
NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 325699 54820
NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 305532 39880
NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 998805 38510
NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 113016 54070
NEYVELI TAMILNADU POWER LTD JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 625274 42200
VALLUR TPS NTPC TECL THERMAL-COAL 150000 856438 42350
R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 1493 84300
RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1502919 29400
RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 341291 31800
SIMHADRI I NTPC LTD THERMAL-COAL 100000 688382 36800
SIMHADRI II NTPC LTD THERMAL-COAL 100000 663657 43400
KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 593110 31324
MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 291625 21764
KKNPP-1 amp 2 NPCIL NUCLEAR-NUCLEAR 200000 572609 40948
MINICOY LAKSHADEEP THERMAL-DIESEL 340 770 29600
KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1097 29600
AMINI LAKSHADEEP THERMAL-DIESEL 265 509 29600
ANDROTT LAKSHADEEP THERMAL-DIESEL 219 524 29600
KALPENI LAKSHADEEP THERMAL-DIESEL 175 356 29600
AGATTI LAKSHADEEP THERMAL-DIESEL 195 658 29600
KADMAT LAKSHADEEP THERMAL-DIESEL 190 414 29600
KILTAN LAKSHADEEP THERMAL-DIESEL 150 269 29600
CHETLET LAKSHADEEP THERMAL-DIESEL 100 139 29600
BITRA LAKSHADEEP THERMAL-DIESEL 043 024 29600
BANGARAM LAKSHADEEP THERMAL-DIESEL 018 009 29600
Page 37
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) STATE SECTOR
Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 721811 46500
Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 50000 336142 46500
RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 237358 46500
RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 239926 46500
RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 124500 46500
SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 62109 46500
UPPER SILERU APGENCO HYDRO-HYDRO 24000 33000 46500
LOWER SILERU APGENCO HYDRO-HYDRO 46000 81066 46500
DONKARAI APGENCO HYDRO-HYDRO 2500 6007 46500
PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 1262 46500
CHETTIPETA APGENCO HYDRO-HYDRO 100 214 46500
MUCHKUND APGENCO HYDRO-HYDRO 12000 37571 46500
NAGARJUNASAGAR RCPH APGENCO HYDRO-HYDRO 9000 606 46500
TUNGABHADRA HES amp HAMPI(AP
Share)
APGENCO HYDRO-HYDRO 7200 6100 46500
KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 352232 42600
KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 288131 32500
KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 319272 46500
RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 40073 44300
KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 308317 46000
KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 308963 51300
SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 61004 76600
NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 17960 75300
PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 20873 58300
POCHAMPAD-I TSPGENCO HYDRO-HYDRO 2700 5455 29800
POCHAMPAD-II TSPGENCO HYDRO-HYDRO 900 1932 40700
NIZAMSAGAR TSPGENCO HYDRO-HYDRO 1000 1126 53400
RAICHUR TPS 1 to 7 KPCL THERMAL-COAL 147000 890866 43800
RAICHUR TPS 8 KPCL THERMAL-COAL 25000 159523 48200
BELLARI TPS 1 KPCL THERMAL-COAL 50000 318679 51100
BELLARI TPS 2 KPCL THERMAL-COAL 50000 232347 55600
BELLARI TPS 3 KPCL THERMAL-COAL 70000 47565 34400
BHADRA PH KPCL HYDRO-HYDRO 3920 2369 45900
GERUSUPPA PH KPCL HYDRO-HYDRO 24000 26990 22000
GHAT PRABHA HEP KPCL HYDRO-HYDRO 3200 4777 25300
KADRA HPS KPCL HYDRO-HYDRO 15000 16889 26800
NAGJHARI KPCL HYDRO-HYDRO 90000 155159 9800
KODASALLI DPH KPCL HYDRO-HYDRO 12000 14854 19200
MUNIRA+MGH+SPH+SPH KPCL HYDRO-HYDRO 22640 48211 7900
SHARAVATHY HPS KPCL HYDRO-HYDRO 108550 276215 5400
ALMATTI DPH KPCL HYDRO-HYDRO 29000 39611 24600
VARAHI UGPH KPCL HYDRO-HYDRO 46000 71368 15600
IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 17196 15300
IDUKKI HPS KSEB HYDRO-HYDRO 78000 137905 15300
KAKKAD HPS KSEB HYDRO-HYDRO 5000 13063 15300
KALLADA HPS KSEB HYDRO-HYDRO 1500 4436 15300
KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 46544 15300
KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 635 15300
LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 30822 15300
MALANKARA HPS KSEB HYDRO-HYDRO 1050 2474 15300
MATTUPETTY KSEB HYDRO-HYDRO 200 230 15300
MALAMPUZHA KSEB HYDRO-HYDRO 250 063 15300
CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 864 15300
URUMI ST I amp II KSEB HYDRO-HYDRO 615 903 15300
LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 248 15300
NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7765 19625 15300
PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 16601 15300
PANNIAR HPS KSEB HYDRO-HYDRO 3240 6217 15300
PORINGALKUTHU KSEB HYDRO-HYDRO 3600 10052 15300
PORINGALKUTHU LBE KSEB HYDRO-HYDRO 1600 9438 15300
PEPPARA KSEB HYDRO-HYDRO 300 395 15300
POOZHITHODE KSEB HYDRO-HYDRO 480 1045 15300
Page 38
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) PEECHI KSEB HYDRO-HYDRO 125 040 15300
RANI-PERUNADU KSEB HYDRO-HYDRO 400 585 15300
SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 79783 15300
SENGULAM HPS KSEB HYDRO-HYDRO 5120 11558 15300
SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 16711 15300
VILANGAD KSEB HYDRO-HYDRO 750 1578 15300
BARAPOLE KSEB HYDRO-HYDRO 1500 1932 15300
VELLATHOOVAL KSEB HYDRO-HYDRO 360 305 15300
CHIM0NY KSEB HYDRO-HYDRO 250 156 15300
ADYANPARA KSEB HYDRO-HYDRO 350 501 15300
BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 554 15300
KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 3801 15300
KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 23132 32800
ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 14416 62280
METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 523970 62280
METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 321270 62280
NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 336575 62280
NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 591240 62280
TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 508966 62280
KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 30897 62280
VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 18720 90699 62280
KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 33593 62280
BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 1047 62280
PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 1250 62280
PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 330 62280
MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 4897 62280
MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 032 62280
KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15681 62280
KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 40608 62280
KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 21342 62280
KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 4717 62280
KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4322 62280
KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2399 62280
METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 4416 62280
METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 8035 62280
BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2187 62280
BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2359 62280
BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2511 62280
BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 1949 62280
BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 1819 62280
POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 172 62280
SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 241 62280
MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 026 62280
THIRUMOORTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 136 62280
PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 9309 62280
VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 353 62280
SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 4192 62280
PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 6571 62280
SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 1186 62280
SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6319 62280
ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 6122 62280
KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 28674 62280
SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 18381 62280
SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 4258 62280
KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 12680 62280
KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4201 62280
ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 000 62280
PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 19175 62280
AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 078 62280
BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 504 62280
BHAVANI KATTALAI (BKB)(IIIampIII BB I amp II)TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 5847 62280
PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 000 62280
Page 39
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) SRI DAMODARAM STPS APPDCL THERMAL-COAL 160000 808108 36300
PRIVATE SECTOR
KARUPPUR TANJORE LANCO TANJORE PCL THERMAL-GAS 12000 48096 28770
SIMHAPURI ENERGY LTD SIMHAPURI ENERGY LTD THERMAL-COAL 60000 143900 39100
JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 7111 45500
SBU 1 JSW ENERGY LTD
VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 26000 159100
43300
SBU 2 JSW ENERGY LTD
VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 60000 247900
42800
LANCO KPLLANCO KONDAPALLI POWER
LTDTHERMAL-GAS 36814 85060
25776
LANCO KPL STG -IILANCO KONDAPALLI POWER
LTDTHERMAL-GAS 36600 12979
46330
LANCO KPL STG -IIIALANCO KONDAPALLI POWER
LTDTHERMAL-GAS 37100 85710
46330
LANCO KPL STG -III BLANCO KONDAPALLI POWER
LTDTHERMAL-GAS 37100 43639
46330
HINDUJA NATIONAL PCL HINDUJA NATIONAL PCL THERMAL-COAL 104000 303000 38200
MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 121164 49940
UDUPI POWER COR LTD ADANI POWER LTD THERMAL-COAL 120000 754613 42500
SPECTRUM POWER GENERATION
LTD SPECTRUM PG LTD THERMAL-GASN 20525 9256812
34952
TAQA NEYVELI POWER COM PVT
LTD TAQA NEYVELI THERMAL-LIG 25000 5840
34500
ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 251000 51000
ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 207860 36800
GMR VEMAGIRI POWER GENERATION
LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 30117
46450
EASTERN REGION
CENTRAL SECTOR
MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 64675 53113
MTPS STAGE - II KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 39000 1432 69138
BOKARO `B` TPS DVC THERMAL-COAL 63000 145670 31539
MEJIA TPS U 1-3 DVC THERMAL-COAL 63000 348298 31552
MEJIA TPS U 4 DVC THERMAL-COAL 21000 116099 34997
MEJIA TPS U 5-6 DVC THERMAL-COAL 50000 276427 35976
MEJIA TPS U 7-8 DVC THERMAL-COAL 100000 552854 36991
DURGAPUR STEEL TPS DVC THERMAL-COAL 100000 665550 39323
DURGAPUR TPS DVC THERMAL-COAL 21000 59270 35416
RAGHUNATHPUR TPS DVC THERMAL-COAL 120000 201650 35326
MAITHON HYDEL STA DVC HYDRO-HYDRO 6320 12200 17984
CHANDRAPURA TPSU1-3 DVC THERMAL-COAL 42000 257610 35095
CHANDRAPURA TPSU7-8 DVC THERMAL-COAL 50000 306673 34987
KODERMA TPS DVC THERMAL-COAL 100000 380180 38131
PANCHET HPS DVC HYDRO-HYDRO 8000 13360 17984
TILLAYA HPS DVC HYDRO-HYDRO 400 1410 17984
RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34700 35400
TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 277300 23200
TLDP -III NHPC LTD HYDRO-HYDRO 13200 55400 62000
TLDP -IV NHPC LTD HYDRO-HYDRO 16000 60300 25600
FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 957219 33700
FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 308943 41000
BONGAINGAON TPS NTPC LTD THERMAL-COAL 25000 153663 58600
KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 542277 34200
KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 942591 34200
BARH-II NTPC LTD THERMAL-COAL 132000 728021 44500
TALCHER TPS NTPC LTD THERMAL-COAL 46000 335521 30100
TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 702319 25600
TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1436521 24700
STATE SECTOR
BTPS(RampM) BIHAR STATE PGCL THERMAL-COAL 22000 12142 39700
BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 98331 10602
HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 50593 9482
CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 19689 2605
RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 53192 6033
UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 147208 14637
Page 40
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 60353 4519
IB TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 288567 25000
J P H GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 210 038 61100
MEYONG CHU GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 400 1086 61100
TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 122667 38200
DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 214339 43321
KOLAGHAT THERMAL POWER
STATION
WEST BENGAL PDCL THERMAL-COAL 126000 538269 31603
BAKRESHWAR THERMAL POWER
PLANT
WEST BENGAL PDCL THERMAL-COAL 105000 634876 32154
BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 45000 166855 33299
SANTHALDIH THERMAL POWER
STATION
WEST BENGAL PDCL THERMAL-COAL 50000 336442 34932
SAGARDIGHI THERMAL POWER
PROJECT
WEST BENGAL PDCL THERMAL-COAL 160000 423121 34705
JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 20344 68900
RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 24559 68900
TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 4623 68900
PURULIA PUMPED STORAGE
PROJECT
WEST BENGAL SEDCL HYDRO-HYDRO 90000 108816 68900
MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2768 68900
PRIVATE SECTOR
CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 49474 20230
CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 555500 70200
HALDIA ENERGY HALDIA ENERGY LTD THERMAL-COAL 60000 371000 50400
DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3688 63400
KAMALANGA TPS GMR KAMALANGA ENERGY LTD THERMAL-COAL 105000547670
33300
ADHUNIK POWER U-1 ADHUNIK POWER THERMAL-COAL 27000 158 44060
ADHUNIK POWER U-2 ADHUNIK POWER THERMAL-COAL 27000 168 44250
VL-JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 332800 23622
JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 43000 45250
JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 71700 37030
JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 70700 35920
JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 71100 38870
JOJOBERA UNIT 5 TATA POWER COM LTD THERMAL-COAL 12000 79300 44560
JOJOBERA UNIT 6 TATA POWER COM LTD THERMAL-WHR 12000 83700 12840
IEL KALINGANAGAR U-I TATA POWER COM LTD THERMAL-WG 6750 33400 22500
IEL KALINGANAGAR U-II TATA POWER COM LTD THERMAL-WG 6750 34800 22500
MAITHON UNIT 1 amp 2 TATA POWER COM LTD THERMAL-COAL 105000 678000 36100
HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 27500 24340
HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 28400 24340
HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 15800 24310
NORTH EASTERN REGION
CENTRAL SECTOR
LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 74100 36600
AGARTALA GT NEEPCO THERMAL-GAS 13500 88611 27210
ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 153111 32310
DOYANG HEP NEEPCO HYDRO-HYDRO 7500 25598 49801
KOPILI HEP NEEPCO HYDRO-HYDRO 20000 98186 11491
KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 19582 20237
KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 10310 17968
RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 124093 22945
TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 10100 17344 39000
STATE SECTOR
HYDRO POWER (122 Stns) ITANAGAR GOVT OF ARUNACHAL
PRADESHHYDRO-HYDRO 6971 6217270
24600
KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39514 17337
LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 82327 36810
NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 33318 48290
MYNTRIANG SHEP ST II ASSAM POWER GENCO HYDRO-HYDRO 300 567 35776
LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 9130 49200
LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 012 49200
DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 022 49200
TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 000 49200
UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 4990 16000
UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 6476 37000
UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 16494 14600
UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 3600 9556 15000
SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 758 8000
MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44070 44800
KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 154 41400
TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 091 41400
MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 411 41400
MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 394 41400
KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 760 41400
SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 3264 41400
LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 044 41400
BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 18953 28000
ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 43585 28200
GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 4080 11100
Note
LIG Lignite N Naptha WHR Waste Heat Recovery
Page 41
File NoCEA-CH-14-1142018-Coordination Division
आकड़ मममलयन यननट नट Figures in MU net
ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied
कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )
चडीगढ़ Chandigarh 108 108 0 00 1055 1055 0 00
दिलली Delhi 2490 2489 1 00 22524 22510 14 01
हरियजणज Haryana 4554 4554 0 00 35205 35205 0 00
दहमजचल परिश Himachal Pradesh 788 787 2 02 5728 5560 168 29
रमम कशमीि Jammu amp Kashmir 1497 1219 278 186 10982 8865 2117 193
परजब Punjab 4418 4418 0 00 38832 38819 13 00
िजरसथजन Rajasthan 6748 6748 0 00 45341 45181 160 04
उतति परिश Uttar Pradesh 10136 9973 164 16 75485 74808 676 09
उततिजखड Uttarakhand 1083 1081 3 03 8395 8310 85 10
उततरी कषतर Northern Region 31822 31375 447 14 243547 240314 3233 13
छततीसगढ़ Chhattisgarh 2454 2453 1 00 16119 16091 28 02
गरिजत Gujarat 11636 11636 0 00 70782 70768 14 00
मधय परिश Madhya Pradesh 5860 5859 1 00 38412 38410 2 00
महजिजषटर Maharashtra 15223 15095 128 08 95489 95355 134 01
िमन औि दिउ Daman amp Diu 216 216 0 00 1523 1523 0 00
िजिि व नगि हवली Dadra amp Nagar Haveli 553 553 0 00 3757 3757 0 00
गोवज Goa 366 366 0 00 2497 2495 2 01
पशचिमी कषतर Western Region 36308 36178 130 04 228579 228398 180 01
आनधर परिश Andhra Pradesh 5860 5854 6 01 37377 37334 43 01
तलगजनज Telangana 6748 6742 6 01 38251 38205 46 01
कनजाटक Karnataka 5842 5835 7 01 39111 39059 52 01
किल Kerala 2116 2096 20 09 14256 14160 96 07
तममल नजड Tamil Nadu 8611 8601 10 01 65742 65666 76 01
पडचिी Puducherry 216 215 1 05 1654 1646 8 05
लकष-दवीप Lakshadweep 4 4 0 0 27 27 0 0
दकषकषणी कषतर Southern Region 29392 29342 50 02 196390 196069 321 02
बबहजि Bihar 2742 2738 4 01 19143 18951 192 10
िजमोिि घजटी ननगम DVC 1712 1698 13 08 13096 12828 268 20
झजिखणड Jharkhand 701 697 4 06 5022 4949 73 15
ओडडशज Odisha 3147 3134 13 04 20224 20192 32 02
पशशचम बगजल West Bengal 4204 4200 4 01 33008 32881 127 04
मसशककम Sikkim 40 40 0 00 279 279 0 01
अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 67 202 188 13 67
परवी कषतर Eastern Region 12547 12507 40 03 90772 90080 692 08
अरणजचल परिश Arunachal Pradesh 67 66 1 09 502 496 7 13
असम Assam 833 809 24 29 6153 5903 250 41
मणणपि Manipur 72 71 1 10 485 478 7 14
मघजलय Meghalaya 147 147 0 00 1043 1042 0 00
ममज़ोिम Mizoram 63 62 1 08 365 359 5 14
नजगजलड Nagaland 76 67 8 110 540 481 59 109
बिपिज Tripura 130 129 1 09 1025 1007 19 18
उततर-परवी कषतर North-Eastern Region 1387 1351 35 25 10113 9766 346 34
समपणण भारत All India 111455 110753 702 06 769399 764627 4773 06
23
ऊराण वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Energy Power Supply Position Report (Provisional)
राजयStateअकरबर2018 October2018 अपरल2018 -अकरबर2018 April2018 to October2018
ऊरजा पनत ा म कमी ऊरजा पनत ा म कमीEnergy not Supplied
Excludes energy exported to Bangladesh
Energy not Supplied
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
File NoCEA-CH-14-1142018-Coordination Division
अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met
कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )
चडीगढ़ Chandigarh 217 217 0 00 369 369 0 00
दिलली Delhi 4713 4713 0 00 7016 7016 0 00
हरियजणज Haryana 7948 7948 0 00 10270 10270 0 00
दहमजचल परिश Himachal Pradesh 1520 1520 0 00 1520 1520 0 00
रमम कशमीि Jammu amp Kashmir 2836 2269 567 200 2951 2361 590 200
परजब Punjab 7979 7979 0 00 12638 12638 0 00
िजरसथजन Rajasthan 11450 11450 0 00 11698 11698 0 00
उतति परिश Uttar Pradesh 17434 16745 688 39 20498 20062 436 21
उततिजखड Uttarakhand 1943 1943 0 00 2143 2143 0 00
उततरी कषतर Northern Region 50659 49635 1024 20 63166 61726 1440 23
छततीसगढ़ Chhattisgarh 4414 4268 146 33 4414 4268 146 33
गरिजत Gujarat 18148 18130 19 01 18148 18130 19 01
मधय परिश Madhya Pradesh 11356 11317 39 03 11356 11317 39 03
महजिजषटर Maharashtra 23864 23159 705 30 23864 23254 610 26
िमन औि दिउ Daman amp Diu 342 341 1 02 357 356 1 02
िजिि व नगि हवली Dadra amp Nagar Haveli 784 780 4 05 816 815 1 01
गोवज Goa 536 536 0 00 596 596 0 00
पशचिमी कषतर Western Region 56548 55695 853 15 56548 55695 853 15
आनधर परिश Andhra Pradesh 9435 9435 0 00 9435 9435 0 00
तलगजनज Telangana 10603 10603 0 00 10815 10815 0 00
कनजाटक Karnataka 10741 10741 0 00 10741 10741 0 00
किल Kerala 3727 3644 83 22 4050 3997 53 13
तममल नजड Tamil Nadu 14747 14333 414 28 15029 14981 47 03
पडचिी Puducherry 363 362 1 03 420 400 19 46
लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0
दकषकषणी कषतर Southern Region 45279 45226 53 01 45946 45684 262 06
बबहजि Bihar 4945 4945 0 00 5050 5045 5 01
िजमोिि घजटी ननगम DVC 2729 2729 0 00 2874 2874 0 00
झजिखणड Jharkhand 1260 1260 0 00 1339 1284 55 41
ओडडशज Odisha 5624 5224 400 71 5624 5357 268 48
पशशचम बगजल West Bengal 8775 8775 0 00 9130 9123 7 01
मसशककम Sikkim 86 86 0 00 90 90 0 00
अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7
परवी कषतर Eastern Region 22959 22567 392 17 22959 22567 392 17
अरणजचल परिश Arunachal Pradesh 138 125 13 94 138 133 5 37
असम Assam 1785 1704 81 45 1865 1809 56 30
मणणपि Manipur 187 185 2 11 193 186 7 36
मघजलय Meghalaya 336 336 0 00 371 368 2 07
ममज़ोिम Mizoram 99 97 2 20 103 98 4 41
नजगजलड Nagaland 134 131 3 22 156 138 18 117
बिपिज Tripura 269 269 0 00 298 293 5 17
उततर-परवी कषतर North-Eastern Region 2790 2700 90 32 2967 2850 117 39
समपणण भारत All India 172945 170604 2341 14 177022 175528 1494 08
24
अधिकतम वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Peak Power Supply Position Report (Provisional)
आकड़ मगज वजट नट Figures in MW netअपरल2018 -अकरबर2018 April2018 to October2018
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
मजग की पनता म कमी Demand not Met
Excludes the supply to Bangladesh
राजयStateअकरबर2018 October2018
मजग की पनता म कमी Demand not Met
File NoCEA-CH-14-1142018-Coordination Division
आकड़ मममलयन यननट नट Figures in MU net
ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied
कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )
चडीगढ़ Chandigarh 141 141 0 00 947 947 0 00
दिलली Delhi 2925 2924 1 00 20034 20021 13 01
हरियजणज Haryana 4794 4794 0 00 30651 30651 0 00
दहमजचल परिश Himachal Pradesh 876 853 24 27 4940 4773 167 34
रमम कशमीि Jammu amp Kashmir 1520 1246 274 180 9485 7646 1839 194
परजब Punjab 5575 5575 0 00 34414 34401 13 00
िजरसथजन Rajasthan 6202 6201 0 00 38594 38434 160 04
उतति परिश Uttar Pradesh 10211 10124 86 08 65349 64836 513 08
उततिजखड Uttarakhand 1162 1149 13 11 7311 7229 82 11
उततरी कषतर Northern Region 33405 33008 398 12 211725 208939 2786 13
छततीसगढ़ Chhattisgarh 2403 2388 15 06 13665 13638 27 02
गरिजत Gujarat 10122 10122 0 00 59146 59132 14 00
मधय परिश Madhya Pradesh 5492 5491 1 00 32552 32551 1 00
महजिजषटर Maharashtra 13615 13612 3 00 80266 80260 6 00
िमन औि दिउ Daman amp Diu 221 221 0 00 1306 1306 0 00
िजिि व नगि हवली Dadra amp Nagar Haveli 551 551 0 00 3204 3204 0 00
गोवज Goa 339 339 0 00 2131 2128 2 01
पशचिमी कषतर Western Region 32742 32723 19 01 192270 192220 50 00
आनधर परिश Andhra Pradesh 5294 5287 7 01 31518 31480 37 01
तलगजनज Telangana 6279 6272 8 01 31503 31463 40 01
कनजाटक Karnataka 5701 5693 8 01 33269 33225 45 01
किल Kerala 2050 2026 24 12 12140 12063 76 06
तममल नजड Tamil Nadu 8971 8959 12 01 57131 57065 66 01
पडचिी Puducherry 226 224 2 08 1438 1431 7 05
लकष-दवीप Lakshadweep 4 4 0 0 23 23 0 0
दकषकषणी कषतर Southern Region 28520 28460 60 02 166998 166727 271 02
बबहजि Bihar 2839 2793 46 16 16400 16213 188 11
िजमोिि घजटी ननगम DVC 1901 1750 151 79 11384 11130 254 22
झजिखणड Jharkhand 740 723 17 22 4321 4252 69 16
ओडडशज Odisha 2921 2918 3 01 17077 17058 19 01
पशशचम बगजल West Bengal 4902 4879 23 05 28804 28681 123 04
मसशककम Sikkim 39 39 0 01 239 239 0 01
अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 67 173 162 12 67
परवी कषतर Eastern Region 13341 13102 240 18 78225 77573 652 08
अरणजचल परिश Arunachal Pradesh 74 73 1 10 435 429 6 14
असम Assam 950 914 36 38 5320 5094 226 43
मणणपि Manipur 70 69 1 11 414 408 6 15
मघजलय Meghalaya 150 150 0 01 896 896 0 01
ममज़ोिम Mizoram 58 57 1 12 302 297 5 16
नजगजलड Nagaland 80 72 8 104 464 414 50 108
बिपिज Tripura 192 191 1 07 895 878 17 19
उततर-परवी कषतर North-Eastern Region 1575 1527 48 31 8726 8415 311 36
समपणण भारत All India 109584 108819 765 07 657944 653873 4071 06
Energy not Supplied Energy not Supplied
ससतबर2018 September2018 अपरल2018 -ससतबर2018 April2018 to September2018
ऊरजा पनत ा म कमी ऊरजा पनत ा म कमी
Excludes energy exported to Bangladesh
राजयState
ऊराण वरवदयत आपरतण शथिरत ररपोरण (सशोधित) Energy Power Supply Position Report (Revised)
25
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
File NoCEA-CH-14-1142018-Coordination Division
अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met
कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )
चडीगढ़ Chandigarh 293 293 0 00 369 369 0 00
दिलली Delhi 5358 5358 0 00 7016 7016 0 00
हरियजणज Haryana 9008 9008 0 00 10270 10270 0 00
दहमजचल परिश Himachal Pradesh 1466 1466 0 00 1479 1479 0 00
रमम कशमीि Jammu amp Kashmir 2951 2361 590 200 2951 2361 590 200
परजब Punjab 11405 11405 0 00 12638 12638 0 00
िजरसथजन Rajasthan 10612 10612 0 00 11698 11698 0 00
उतति परिश Uttar Pradesh 18346 18121 225 12 20498 20062 436 21
उततिजखड Uttarakhand 1996 1996 0 00 2143 2143 0 00
उततरी कषतर Northern Region 56407 55649 758 13 63166 61726 1440 23
छततीसगढ़ Chhattisgarh 4404 4075 328 75 4404 4136 268 61
गरिजत Gujarat 16963 16963 0 00 17053 16963 90 05
मधय परिश Madhya Pradesh 8811 8771 41 05 8811 8775 36 04
महजिजषटर Maharashtra 22455 22349 106 05 23395 23254 141 06
िमन औि दिउ Daman amp Diu 357 356 1 02 357 356 1 02
िजिि व नगि हवली Dadra amp Nagar Haveli 816 815 1 01 816 815 1 01
गोवज Goa 596 596 0 00 596 596 0 00
पशचिमी कषतर Western Region 52933 52895 38 01 53841 52895 945 18
आनधर परिश Andhra Pradesh 9435 9416 19 02 9435 9416 19 02
तलगजनज Telangana 10815 10815 0 00 10815 10815 0 00
कनजाटक Karnataka 10103 10090 13 01 10690 10688 2 00
किल Kerala 3888 3638 251 64 4050 3997 53 13
तममल नजड Tamil Nadu 14556 14553 3 00 15029 14981 47 03
पडचिी Puducherry 390 372 17 45 420 400 19 46
लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0
दकषकषणी कषतर Southern Region 45542 45428 114 02 45946 45684 262 06
बबहजि Bihar 5050 5045 5 01 5050 5045 5 01
िजमोिि घजटी ननगम DVC 2641 2641 0 00 2874 2874 0 00
झजिखणड Jharkhand 1233 1233 0 00 1339 1284 55 41
ओडडशज Odisha 4906 4906 0 00 5357 5357 0 00
पशशचम बगजल West Bengal 8644 8639 5 01 9130 9123 7 01
मसशककम Sikkim 78 78 0 00 90 90 0 00
अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7
परवी कषतर Eastern Region 22110 22100 10 00 22470 22290 180 08
अरणजचल परिश Arunachal Pradesh 132 130 2 15 138 133 5 37
असम Assam 1865 1809 56 30 1865 1809 56 30
मणणपि Manipur 184 182 2 13 193 186 7 36
मघजलय Meghalaya 317 317 0 00 371 368 2 07
ममज़ोिम Mizoram 95 93 2 23 103 98 4 41
नजगजलड Nagaland 142 138 5 32 156 138 18 117
बिपिज Tripura 296 293 3 10 298 293 5 17
उततर-परवी कषतर North-Eastern Region 2921 2850 71 24 2967 2850 117 39
समपणण भारत All India 177022 175528 1494 08 177022 175528 1494 08
26
मजग की पनता म कमी मजग की पनता म कमी Demand not MetDemand not Met
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
Excludes the supply to Bangladesh
अधिकतम वरवदयत आपरतण शथिरत ररपोरण (सशोधित) Peak Power Supply Position Report (Revised)
आकड़ मगज वजट नट Figures in MW net
राजयStateससतबर2018 September2018 अपरल2018 -ससतबर2018 April2018 to September2018
File NoCEA-CH-14-1142018-Coordination Division
अकरबर2018 October2018अपरल2018 -अकरबर2018 April2018 to October2018
उततरी कषतर Northern Region
चडीगढ़ Chandigarh Data not received Data not received
दिलली Delhi
हरियजणज Haryana
दहमजचल परिश Himachal Pradesh
रमम कशमीि Jammu amp Kashmir Data not received Data not received
परजब Punjab
िजरसथजन Rajasthanउतति परिश Uttar Pradesh
उततिजखड Uttarakhand
पशचिमी कषतर Western Region
छततीसगढ़ Chhattisgarh
गरिजत Gujarat
मधय परिश Madhya Pradesh
महजिजषटर Maharashtra
गोवज Goa
दकषकषणी कषतर Southern Region
आनधर परिश Andhra Pradesh
तलगजनज Telangana
कनजाटक Karnataka
किल Kerala
तममल नजड Tamil Nadu
पडचिी Puducherryपरवी कषतर Eastern Region
बबहजि Bihar
झजिखणड Jharkhand
ओडडशज Odisha
पशशचम बगजल West Bengal
N
o No
tified
Cuts
N
o No
tified
Cuts
27
अकरबर 2018 म इडथरीर पर वरवदयत करौती का वरवरवरण Notified Power CutsRestrictions on Industries during October2018
राजय कषतर State Regionऊराणमाग करौती EnergyDemand Cut
No Notified Cuts No Notified Cuts
File NoCEA-CH-14-1142018-Coordination Division
अकरबर2018 October2018अपरल2018 -अकरबर2018 April2018 to October2018
उततरी कषतर Northern Region
चडीगढ़ Chandigarh Data not received Data not received
दिलली Delhi Data not received Data not received
हरियजणज Haryana 940 hrsday 0709 - 0950 hrsday
दहमजचल परिश Himachal Pradesh No cut imposed on agriculture consumers and uninterrupted
power is being supplied to agriculture sector
HPSEBL has only 2 agriculture consumers and uninterrupted
power is being supplied to agriculture sector
रमम कशमीि Jammu amp Kashmir Data not received Data not received
परजब Punjab 0507 hrsday 0349 - 0844 hrsday
िजरसथजन Rajasthan 0630 hrsday 0630 hrsday
उतति परिश Uttar Pradesh 1825 hrsday 1814 - 1858 hrsday
उततिजखड Uttarakhand 2350 hrsday 2128 - 2357 hrsday
पशचिमी कषतर Western Region
छततीसगढ़ Chhattisgarh 18hoursday 18 hrsday
गरिजत Gujarat 805 hrsday 805 hrsday
मधय परिश Madhya Pradesh Three-Phase Supply(Irrigation)-947 hrs day
Three-Phase (Mixed) Supply - 2311 hrs day
Three-Phase Supply(Irrigation)- 0933 - 0947 hrs day Three-
Phase (Mixed) Supply - 2300 - 2320 hrs day
महजिजषटर Maharashtra Three-Phase Supply(Irrigation)- 9 hrs day
Three-Phase (Mixed) Supply - 24 hrs day
Three-Phase Supply(Irrigation)- 9 hrs day
Three-Phase (Mixed) Supply - 24 hrs day
गोवज Goa No restriction No restriction
दकषकषणी कषतर Southern Region
आनधर परिश Andhra Pradesh 07 hrsday 07 hrsday
तलगजनज Telangana 24 hoursday 24 hoursday
कनजाटक Karnataka 6 hrsday 6 hrsday
किल Kerala No Restrictions No Restrictions
तममल नजड Tamil Nadu 9 hrsday (6 hrs during day time and 3 hrs during night time) 9 hrsday (6 hrs during day time and 3 hrs during night time)
पडचिी Puducherry No Restrictions No Restrictions
परवी कषतर Eastern Region
बबहजि Bihar About 18 hrsday About 18 hrsday
झजिखणड Jharkhand About 20 hrsday About 20 hrsday
ओडडशज Odisha 24 hrsday 24 hrsday
पशशचम बगजल West Bengal About 23 hrsday About 23 hrsday
28
अकटबर 2018 कषि कषतर को षिदयत आपरति का षििरण Power Supply to Agricultural Sector during October2018
राजय कषतर State Regionऔसत वरवदयत आपरतण घनरो म Average Hours of Supply
On segregated feeders
File NoCEA-CH-14-1142018-Coordination Division
SNo Contents Page
1 Growth of Installed Capacity since 6th Plan 29
2 Progress of Transmission Sector since 6th Plan 30
3 All India Yearly Coal consumption for Power Generation (Utilities)
4 All India Annual Per Capita Consumption of Electricity since -2006
5 Average cost of power supply amp Average realisation (Paisakwh)
6 Growth of Rural Electrification amp Pump Sets Energisation
7 Status of Hydro Schemes Cleared by the CEA in Oct-2018
Section G - Growth of Power Sector
31
32
File NoCEA-CH-14-1142018-Coordination Division
(In MW)
Coal Gas Diesel Total
End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472
End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634
End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537
End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596
End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921
End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703
End of 12th Plan 19216288 2532938 83763 21832988 6780 4447842 50018 31960630
Up to Oct-2018 19599250 2493722 837629 22176734 6780 4548742 7201281 34604757
Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-17) = 51529 MW
Electricity Generation (MU) Targets and Achievements for 2016-17
Coal Gas Diesel Nuclear Hydro Res Total
1959925 2493722 837629 678000 454874 72012805 22925174
29
1 Growth of Installed Capacity Since 6th Plan
Plan YearThermal
Nuclear Hydro RES (MNRE) Total
Total Installed Capacity 34604757 MW
Coal Gas Diesel Nuclear Hydro Res
File NoCEA-CH-14-1142018-Coordination Division
Progress of Transmission Sector in the Country up to Oct 2018
1 TRANSMISSION LINES (All fig in CKM)
At the end of
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
6th plan 0 0 0 0 0 0 0 0 0 0 0 0 1831 4198 0 6029 1641 44364 0 46005 3472 48562 0 52034
7th plan 0 0 0 0 0 0 0 0 0 0 0 0 13068 6756 0 19824 4560 55071 0 59631 17628 61827 0 79455
8th plan 0 0 0 0 1634 0 0 1634 0 0 0 0 23001 13141 0 36142 6564 73036 0 79600 31199 86177 0 117376
9th plan 0 0 0 0 3234 1504 0 4738 751 409 0 1160 29345 20033 0 49378 8687 88306 0 96993 42017 110252 0 152269
10th plan 0 0 0 0 4368 1504 0 5872 1775 409 0 2184 48708 24730 0 73438 9444 105185 0 114629 64295 131828 0 196123
11th Plan 0 0 0 0 5948 1504 1980 9432 4839 411 0 5250 71023 30191 5605 106819 10140 125010 830 135980 91950 157116 8415 257481
12th Plan 6124 0 0 6124 5948 1504 1980 9432 25465 1177 4598 31240 92482 48240 17065 157787 11014 151276 978 163268 141033 202197 24621 367851
13th Plan (Up
to Mar2018)6124 0 0 6124 5948 1504 1980 9432 28666 1512 4881 35059 98247 54286 19067 171600 11258 156497 1000 168755 150243 213799 26928 390970
13th Plan (Up
to Sep-18)6124 0 0 6124 5948 1504 1980 9432 30952 1512 5059 37523 99683 56069 20662 176414 11318 160958 1000 173276 154025 220043 28701 402769
27150
75050
47900
118050
90650
30
IR addition in 12th Plan (up to
March 2017)
Total IR (up to Oct-18)
IR at the end of 11th Plan
IR at the end of 12th Plan
Envisaged IR Capacity at the end
of 13th Plan
Grand Total
Note - The figure upto the end of 10th plan in for stringing progress including the lines not commissioned Now only commissioned lines are reckoned Accordingly the figure for 10th plan (end) may read as 187555 after adjusting with (-) 10852 Ckm
Inter-regional Power Transfer Capacity
plusmn 800 kV HVDC plusmn 500 kV HVDC 765 kV 400 kV 220 kV
File NoCEA-CH-14-1142018-Coordination Division
2004-05 27800
2005-06 28100
2006-07 30200
2007-08 33000
2008-09 35500
2009-10 36700
2010-11 38700
2011-12 41756
2012-13 45460
2013-14 48940
2014-15 53040
2015-16 54590
2016-17 57430
2017-18 60800
Year
2005-06
2006-07
2007-08
2008-09
2009-10
2010-11
2011-12
2012-13
2013-14
2014-15
2015-16
2016-17
2017-18
2004-05 254 209 7568
2005-06 260 221 7636
2006-07 276 227 7423
2007-08 293 239 7727
2008-09 340 263 8713
2009-10 355 268 8870
2010-11 398 303 11975
2011-12 455 330 13514
2012-13 501 376 14867
2013-14 518 175
2014-15 520
6719
7171
3 All India yearly Coal Consumption for Power Generation (Utilities)
YEARCoal Consumption
Million Tonnes
4 All India Annual per Capita consumption of Electricity Since 2006
Per Capita Consumption ( kWh)
6314
(GrossGen+ Net Import) Mid-year population
5 Average cost of power supply amp average realization ( paiseKWH )
Yearcost of supply
(paiseunit)
Realization(paiseunit)
Including AgricultureOnly
Agriculture
1149
7335
7786
91441
8188
88363
957
1010
1075
1122
File NoCEA-CH-14-1142018-Coordination Division
Source- PFC Reports on the performance of State Power Utilities 31
File NoCEA-CH-14-1142018-Coordination Division
Sl
NoExecuting Agency
Installed
Capacity (MW)Cost (Rs crore)
Date of
Clearance
32
No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification
since 2004-05
65291374575 296361511th Plan
Cumu upto End of 11th Plan
596556 21212860
557439Cummulative up to end of 12th Plan
46708
18423975
499150
2003-042004-05
5743
9769
Cumu upto End of 10th Plan
010407 to 310308
010410 to 310311557976840909
010411 to 310312
412667
86293726
3207
482864
12632
1576036
4451722594
15455554
2314176
397343611750
2093311060316074
65109527813884
6 Growth Of Rural Electrification amp Pumpsets Energisation
Plan Year
9th Plan2002-03
134092626
4111
Pump Sets Energised Villages Electricfied (Nos)
2001-02
284064367244
1218
27801997-981998-991999-002000-01
297594
010408 to 310309010409 to 310310
10th Plan
2005-062006-07
322968331020
Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as
Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received
from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made
available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified
villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is
independent of the earlier published reports
No Hydro Electric Project has been issued concurrenceAppraisal letter by CEA during October 2018
7 Status of Hydro Schemes Cleared by the CEA in Oct-2018
Name of Scheme
File NoCEA-CH-14-1142018-Coordination Division
SN Contents Page
1 Rate of sale of power for the year 2016-17 33-41
RATE OF SALE OF POWER FOR THE YEAR 2016-17
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) NORTHERN REGION
CENTRAL SECTOR
BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 18000 66900 19800
CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 54000 222400 21600
CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 30000 144400 19600
CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 23100 91700 42600
PARBATI - III HPS NHPC LTD HYDRO-HYDRO 52000 68200 54800
DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 28000 95600 30000
CHUTAK NHPC LTD HYDRO-HYDRO 4400 22000 79800
DULHASTI HPS NHPC LTD HYDRO-HYDRO 39000 228000 56400
SALAL HPS NHPC LTD HYDRO-HYDRO 69000 342300 11000
TANAKPUR HPS NHPC LTD HYDRO-HYDRO 9420 43000 29600
URI HPS -I NHPC LTD HYDRO-HYDRO 48000 280300 16000
URI HPS - II NHPC LTD HYDRO-HYDRO 24000 147300 48600
NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 4500 24600 88200
SEWA - II NHPC LTD HYDRO-HYDRO 12000 47100 43400
ANTA CCPP NTPC LTD THERMAL-GASN 41930 67539 32400
AURAIYA CCPP NTPC LTD THERMAL-GASN 66336 53501 39100
BADARPUR TPS NTPC LTD THERMAL-COAL 70500 159153 44800
DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 84000 296170 42300
DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 98000 526686 46300
DADRI CCPP NTPC LTD THERMAL-GASHSD 82978 227469 33000
FARIDABAD CCPP NTPC LTD THERMAL-GASN 43159 115577 30800
RIHAND STPS I NTPC LTD THERMAL-COAL 100000 596766 24500
RIHAND STPS II NTPC LTD THERMAL-COAL 100000 737069 24600
RIHAND STPS III NTPC LTD THERMAL-COAL 100000 706546 30600
SINGRAULI STPS NTPC LTD THERMAL-COAL 200000 1394068 20400
TANDA TPS NTPC LTD THERMAL-COAL 44000 295438 40800
UNCHAHAR TPS I NTPC LTD THERMAL-COAL 42000 256454 39800
UNCHAHAR TPS II NTPC LTD THERMAL-COAL 42000 273577 38900
UNCHAHAR TPS III NTPC LTD THERMAL-COAL 21000 142780 43000
KOLDAM NTPC LTD HYDRO-HYDRO 80000 363260 43600
NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 303575 25841
RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 108000 668677 35374
NJHPS SJVNL HYDRO-HYDRO 150000 699496 23820
RAMPUR HPS SJVNL HYDRO-HYDRO 41202 195982 32260
TEHRI HPP THDC HYDRO-HYDRO 100000 272543 51800
KOTESHWAR HEP THDC HYDRO-HYDRO 40000 106244 53400
IGSTPS JHAJJAR ARAVALI P CPL THERMAL-COAL 150000 510429 49490
NEYVELI BARSINGSAR NEYVELI LIG CORP LTD THERMAL-LIG 25000 127520 38040
STATE SECTOR
PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 21000 14222 48200
PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 21000 19205 48400
PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 25000 102257 42600
PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 25000 62107 41800
DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 60000 312213 41000
RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 120000 35767442200
WYC HYDEL STATION HPGCL HYDRO-HYDRO 6240 20365 24900
GIRI POWER HOUSE HPSEB HYDRO-HYDRO 6000 13958 7600
ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 1695 5467 11900
BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 12000 18528 6700
GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 2250 7462 22500
BASSI POWER HOUSE HPSEB HYDRO-HYDRO 6600 29649 7500
BINWA POWER HOUSE HPSEB HYDRO-HYDRO 600 2749 19300
ANNEXURE-I
RATE OF SALE OF POWER FOR THE YEAR 2016-2017
Page 33
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) GAJ POWER HOUSE HPSEB HYDRO-HYDRO 1050 2914 26700
BANER POWER HOUSE HPSEB HYDRO-HYDRO 1200 2864 16200
HOLI POWER HOUSE HPSEB HYDRO-HYDRO 300 616 22500
THIROT POWER HOUSE HPSEB HYDRO-HYDRO 450 1126 22500
KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 1200 3064 22500
LARJI POWER HOUSE HPSEB HYDRO-HYDRO 12600 53677 23700
NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 250 750 31000
CHABA POWER HOUSE HPSEB HYDRO-HYDRO 175 465 23300
RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 150 101 13400
SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 200 000 22500
KILLAR HPSEB HYDRO-HYDRO 030 050 22500
BHABA AUGUMENP H HPSEB HYDRO-HYDRO 450 1276 22500
BS CHAMBA HPSEB HYDRO-HYDRO 045 099 19500
GUMMA HPSEB HYDRO-HYDRO 300 423 22500
GAS TURBINE POWER STATION IPGCL THERMAL-GAS 27000 67233 39300
PPS-I PPCL THERMAL-GAS 33000 175905 38300
PPS-III PPCL THERMAL-GAS 137120 196879 36100
LOWER JHELUM JampKPDD HYDRO-HYDRO 10500 60214 5100
UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 2260 10514 6300
UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 10500 44202 8500
GANDHARBAL JampKPDD HYDRO-HYDRO 1500 8925 4700
KARNAH MPH JampKPDD HYDRO-HYDRO 200 1122 31000
CHENANI I JampKPDD HYDRO-HYDRO 2330 10892 6600
CHENANI II JampKPDD HYDRO-HYDRO 200 1188 9300
CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 750 3634 14200
IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 375 2108 18500
IGO MERCHELLONG JampKPDD HYDRO-HYDRO 300 1572 29700
PAHALGAM MHP JampKPDD HYDRO-HYDRO 450 1713 32900
MARPACHOO JampKPDD HYDRO-HYDRO 075 375 29800
HAFTAL JampKPDD HYDRO-HYDRO 100 483 28700
SANJAK JampKPDD HYDRO-HYDRO 126 441 36000
SEWA-III JampKPDD HYDRO-HYDRO 900 3273 20200
BHADERWAH JampKPDD HYDRO-HYDRO 150 935 8900
BAZGO JampKPDD HYDRO-HYDRO 030 108 33300
SUMOOR JampKPDD HYDRO-HYDRO 010 045 35400
HUNDER JampKPDD HYDRO-HYDRO 040 176 26200
STAKNA JampKPDD HYDRO-HYDRO 400 1933 4100
KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 124000 662879 31360
SURATGARH TPS RRVUNL THERMAL-COAL 150000 402328 41730
CHHABRA TPS 1amp 2 RRVUNL THERMAL-COAL 50000 305946 36700
CHHABRA TPS 3 RRVUNL THERMAL-COAL 25000 151536 36700
CHHABRA TPS 4 RRVUNL THERMAL-COAL 25000 155896 36700
RAMGARH GT POWER PROJECT RRVUNL THERMAL-COAL 22050 43177 41800
RAMGARH GAS T P PROJECT 3 RRVUNL THERMAL-GAS 5000 93615 41800
DHOLPUR C C POWER PROJECT RRVUNL THERMAL-R-LNG 33000 9486 46110
MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 14000 20855 34192
MINI MICRO HYDEL (MMH) P S RRVUNL HYDRO-HYDRO 2385 851 37800
KALISINDH TPP 1 RRVUNL THERMAL-COAL 60000 341543 45000
KALISINDH TPP 2 RRVUNL THERMAL-COAL 60000 211588 45000
KHARA HEP UPJVNL HYDRO-HYDRO 7200 26654 7200
MATATILLA HEP UPJVNL HYDRO-HYDRO 3060 12219 6500
OBRA HEP UPJVNL HYDRO-HYDRO 9900 21517 6300
RIHAND UPJVNL HYDRO-HYDRO 30000 57369 5500
ANPARA A TPS UPRVUNL THERMAL-COAL 63000 317536 27000
ANPARA B TPS UPRVUNL THERMAL-COAL 100000 705605 22700
ANPARA D UPRVUNL THERMAL-COAL 100000 300158 39800
HARDUAGANJ TPS UPRVUNL THERMAL-COAL 16500 45817 49200
HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 50000 304389 46600
OBRA A TPS UPRVUNL THERMAL-COAL 28800 13158 34000
OBRA B TPS UPRVUNL THERMAL-COAL 100000 328124 21900
Page 34
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) PANKI TPS UPRVUNL THERMAL-COAL 21000 66488 50300
PARICHHA TPS UPRVUNL THERMAL-COAL 22000 38762 49400
PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 42000 231931 45600
PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 50000 276722 50400
CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 24000 70845 8290
CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 14400 75366 8390
DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 3375 9595 12080
DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 5100 18701 10520
KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4140 17359 12330
KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 12000 33001 9420
KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 3000 11953 8320
TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 9000 33983 12460
MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 30400 124510 16110
RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 19800 17897 10550
MPUR UTTARAKHAND JVNL HYDRO-HYDRO 930 5121 19200
PATHRI UTTARAKHAND JVNL HYDRO-HYDRO 2040 11636 14200
GALOGI UTTARAKHAND JVNL HYDRO-HYDRO 300 648 12500
PRIVATE SECTOR
MGTPP CLP INDIA PVT LTD THERMAL-COAL 132000 268902 41940
SHRINAGAR HEP ALAKNANDA HPCL HYDRO-HYDRO 33000 127414 48800
GAMA INFRAPROP CCPP GAMA INFRAPROP PVT THERMAL-GAS 22500 52686 47000
PPGCL (BARA) JP POWER VENTURES LTD THERMAL-COAL 198000 448200 38500
MALANA HEP MALANA PCL HYDRO-HYDRO 8600 26354 29792
MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 10000 30369 32580
ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 19200 56347 36079
KASHANG HEP H P PCL HYDRO-HYDRO 19500 5034 29200
BASPA-II HEP HBPCL HYDRO-HYDRO 30000 132769 13600
KARCHAM WANGTOO HEP HBPCL HYDRO-HYDRO 100000 434386 36600
RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 108000 582600 43700
RITHALA COMBI CY POWER PLANT TATA POWER DDL THERMAL-GAS 9480 000 11900
RAJPURA TPS NABHA POWER LTD THERMAL-GAS 140000 901484 39000
TALWANDI SABO POWER LTD TALWANDI SABO POWER LTD THERMAL-COAL 198000 636040 49548
ROJA THERMAL POWER STATION ROJA POWER SCL THERMAL-COAL 120000 727200 43400
KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 34400 63400
BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 36000 62600
MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 38200 60800
UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 37900 61500
KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 42300 58800
LALITPUR PGCL BAJAJ ENERGY PVT LTD THERMAL-COAL 198000 359400 47300
PRAYAGRAJ PGCL PRAYAGRAJ PGCL THERMAL-COAL 132000 448200 38595
KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 132000 783182 33438
WESTERN REGION
CENTRAL SECTOR
INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 100000 325333 23892
OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 52000 141663 34001
GANDHAR CCPP NTPC LTD THERMAL-GAS 65739 221924 28700
KAWAS CCPP NTPC LTD THERMAL-GASN 65620 167929 27000
KORBA I amp II NTPC LTD THERMAL-COAL 210000 1499171 20500
KORBA III NTPC LTD THERMAL-COAL 50000 358746 26600
SIPAT STPS I NTPC LTD THERMAL-COAL 198000 1479902 26800
SIPAT STPS II NTPC LTD THERMAL-COAL 100000 766549 26500
VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 126000 693142 25800
VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 100000 608781 23800
VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 100000 673475 27600
VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 100000 655924 32900
VINDHYACHAL STPS V NTPC LTD THERMAL-COAL 50000 328265 31700
MOUDA I NTPC LTD THERMAL-COAL 100000 343130 44500
MOUDA Ii NTPC LTD THERMAL-COAL 66000 40637 39900
RATNAGIRI GAS amp POWER PVT LTD RGPPL THERMAL-GAS 196708 442485 47000
KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 000 24729
TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 32000 201227 10740
Page 35
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 365122 19069
TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 787444 29324
STATE SECTOR
GSEG-HAZIRA15610 MW GUJARAT S ENEGEN LTD THERMAL-GAS 15610 1805 28200
GSEG-HAZIRA35143 MW GUJARAT S ENEGEN LTD THERMAL-GAS 35130 22276 51300
GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 21978 51800
AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 13929 26100
KORBA TPS EAST CSPGCL THERMAL-COAL 44000 198673 33880
DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 365808 27570
KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 316500 30420
HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 532878 19410
CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 515 58300
MTTPS CHAMPA U-I CSPGCL THERMAL-COAL 50000 220376 39000
MTTPS CHAMPA U-II CSPGCL THERMAL-COAL 50000 23709 10000
SHP GANGREL CSPGCL HYDRO-HYDRO 1000 2350 36790
BANGO HEP CSPGCL HYDRO-HYDRO 12000 14662 8900
MHP KORBA WEST CSPGCL HYDRO-HYDRO 170 859 38190
SIKASAR HEP CSPGCL HYDRO-HYDRO 700 418 26870
DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8843 74500
DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 19446 51500
GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 66388 71600
GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127488 41300
KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 96072 43900
KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 29841 56400
SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 184966 58800
UKAI 1-5 GSECL THERMAL-COAL 85000 204891 46900
UKAI TPS 6 GSECL THERMAL-COAL 50000 284448 48200
WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 271999 58300
WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 82808 44100
KADANA HPS GSECL HYDRO-HYDRO 24200 34433 16800
UKAI HPS GSECL HYDRO-HYDRO 30500 40585 6100
TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 123000 11500
BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 8900 10900
BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 7200 27500
JHINNA HPS MPPGCL HYDRO-HYDRO 2000 9700 18500
RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 44300 3400
GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 17300 4600
SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 4100 16900
MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 14600 27000
PENCH HPS MPPGCL HYDRO-HYDRO 16000 23700 8100
RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 3000 16900
AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 134400 35100
SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 283800 38700
SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 344600 34300
SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 111600 61600
SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 211800 58000
SSTPS PH-I MPPGCL THERMAL-COAL 120000 233100 84300
BHUSAWAL TPS MSPGCL THERMAL-COAL 142000 566258 51100
CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1365682 33700
KHAPERKHEDA MSPGCL THERMAL-COAL 134000 706207 39100
KORADI TPS MSPGCL THERMAL-COAL 62000 443206 42000
NASIK TPS MSPGCL THERMAL-COAL 63000 297275 47000
PARLI TPS MSPGCL THERMAL-COAL 113000 175934 71600
PARAS MSPGCL THERMAL-COAL 50000 267931 38700
URAN CCPP MSPGCL THERMAL-GAS 67200 320330 30600
KOYANA MSPGCL HYDRO-HYDRO 195600 328155 13100
SMALL HYDRO POWER PLANTS MSPGCL HYDRO-HYDRO 45400 93062 30500
BHIRA MSPGCL HYDRO-HYDRO 8000 10046 8400
TILLARI MSPGCL HYDRO-HYDRO 8900 10584 3100
SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 233298 20500
SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 87633 20500
PRIVATE SECTOR
Page 36
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 81282 46750
JNSTPP(JAYPEE NIGRIE) JP POWER VENTURES LTD THERMAL-COAL 132000 726695 29310
MB POWER MB POWER THERMAL-COAL 120000 345632 38310
ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 754922 28671
ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 780761 23495
ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 198000 1263784 32090
ADANI POWER MAHARA ADANI POWER LTD THERMAL-COAL 330000 1666191 34124
AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 170065 36827
SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 252035 45129
ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 458551 36000
ESSAR POWER MP LTD ESSAR POWER MP LTD THERMAL-COAL 60000 243040 28600
VEDANTA LTD (P P -I) VEDANTA LTD THERMAL-GAS 3000 15044 24000
VEDANTA LTD (P P -II) VEDANTA LTD THERMAL-GAS 3000 21293 24000
PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 8234600 24000
165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 5850 64390
145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 68717 40349
SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 132655 28776
SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 144686 38567
MUNDRA UMPPCOASTAL GUJARAT POWER
LTD THERMAL-IMP COAL 400000 2530300
23900
LANCO AMARKANTAK TPP PATHADIH
U-ILANCO AMARKAN POWER LTD THERMAL-COAL 30000 195500
29200
LANCO AMARKANTAK TPP PATHADIH
U-IILANCO AMARKAN POWER LTD THERMAL-COAL 30000 206900
27600
BARADARHA TPS D B POWER LTD THERMAL-COAL 120000 677373 29200
JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 405000 28900
JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 453000 40500
DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 339437 40700
TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 293400 44000
TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 137200 37000
TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 174900 44000
BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 92900 14100
BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23700 34300
KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 27600 48300
CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2530300 23900
BHANDARDRA HEP -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 2475 54900
SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 161400 26500
SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 445000 39000
SOTHERN REGION
CENTRAL SECTOR
NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 325699 54820
NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 305532 39880
NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 998805 38510
NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 113016 54070
NEYVELI TAMILNADU POWER LTD JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 625274 42200
VALLUR TPS NTPC TECL THERMAL-COAL 150000 856438 42350
R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 1493 84300
RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1502919 29400
RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 341291 31800
SIMHADRI I NTPC LTD THERMAL-COAL 100000 688382 36800
SIMHADRI II NTPC LTD THERMAL-COAL 100000 663657 43400
KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 593110 31324
MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 291625 21764
KKNPP-1 amp 2 NPCIL NUCLEAR-NUCLEAR 200000 572609 40948
MINICOY LAKSHADEEP THERMAL-DIESEL 340 770 29600
KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1097 29600
AMINI LAKSHADEEP THERMAL-DIESEL 265 509 29600
ANDROTT LAKSHADEEP THERMAL-DIESEL 219 524 29600
KALPENI LAKSHADEEP THERMAL-DIESEL 175 356 29600
AGATTI LAKSHADEEP THERMAL-DIESEL 195 658 29600
KADMAT LAKSHADEEP THERMAL-DIESEL 190 414 29600
KILTAN LAKSHADEEP THERMAL-DIESEL 150 269 29600
CHETLET LAKSHADEEP THERMAL-DIESEL 100 139 29600
BITRA LAKSHADEEP THERMAL-DIESEL 043 024 29600
BANGARAM LAKSHADEEP THERMAL-DIESEL 018 009 29600
Page 37
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) STATE SECTOR
Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 721811 46500
Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 50000 336142 46500
RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 237358 46500
RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 239926 46500
RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 124500 46500
SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 62109 46500
UPPER SILERU APGENCO HYDRO-HYDRO 24000 33000 46500
LOWER SILERU APGENCO HYDRO-HYDRO 46000 81066 46500
DONKARAI APGENCO HYDRO-HYDRO 2500 6007 46500
PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 1262 46500
CHETTIPETA APGENCO HYDRO-HYDRO 100 214 46500
MUCHKUND APGENCO HYDRO-HYDRO 12000 37571 46500
NAGARJUNASAGAR RCPH APGENCO HYDRO-HYDRO 9000 606 46500
TUNGABHADRA HES amp HAMPI(AP
Share)
APGENCO HYDRO-HYDRO 7200 6100 46500
KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 352232 42600
KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 288131 32500
KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 319272 46500
RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 40073 44300
KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 308317 46000
KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 308963 51300
SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 61004 76600
NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 17960 75300
PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 20873 58300
POCHAMPAD-I TSPGENCO HYDRO-HYDRO 2700 5455 29800
POCHAMPAD-II TSPGENCO HYDRO-HYDRO 900 1932 40700
NIZAMSAGAR TSPGENCO HYDRO-HYDRO 1000 1126 53400
RAICHUR TPS 1 to 7 KPCL THERMAL-COAL 147000 890866 43800
RAICHUR TPS 8 KPCL THERMAL-COAL 25000 159523 48200
BELLARI TPS 1 KPCL THERMAL-COAL 50000 318679 51100
BELLARI TPS 2 KPCL THERMAL-COAL 50000 232347 55600
BELLARI TPS 3 KPCL THERMAL-COAL 70000 47565 34400
BHADRA PH KPCL HYDRO-HYDRO 3920 2369 45900
GERUSUPPA PH KPCL HYDRO-HYDRO 24000 26990 22000
GHAT PRABHA HEP KPCL HYDRO-HYDRO 3200 4777 25300
KADRA HPS KPCL HYDRO-HYDRO 15000 16889 26800
NAGJHARI KPCL HYDRO-HYDRO 90000 155159 9800
KODASALLI DPH KPCL HYDRO-HYDRO 12000 14854 19200
MUNIRA+MGH+SPH+SPH KPCL HYDRO-HYDRO 22640 48211 7900
SHARAVATHY HPS KPCL HYDRO-HYDRO 108550 276215 5400
ALMATTI DPH KPCL HYDRO-HYDRO 29000 39611 24600
VARAHI UGPH KPCL HYDRO-HYDRO 46000 71368 15600
IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 17196 15300
IDUKKI HPS KSEB HYDRO-HYDRO 78000 137905 15300
KAKKAD HPS KSEB HYDRO-HYDRO 5000 13063 15300
KALLADA HPS KSEB HYDRO-HYDRO 1500 4436 15300
KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 46544 15300
KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 635 15300
LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 30822 15300
MALANKARA HPS KSEB HYDRO-HYDRO 1050 2474 15300
MATTUPETTY KSEB HYDRO-HYDRO 200 230 15300
MALAMPUZHA KSEB HYDRO-HYDRO 250 063 15300
CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 864 15300
URUMI ST I amp II KSEB HYDRO-HYDRO 615 903 15300
LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 248 15300
NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7765 19625 15300
PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 16601 15300
PANNIAR HPS KSEB HYDRO-HYDRO 3240 6217 15300
PORINGALKUTHU KSEB HYDRO-HYDRO 3600 10052 15300
PORINGALKUTHU LBE KSEB HYDRO-HYDRO 1600 9438 15300
PEPPARA KSEB HYDRO-HYDRO 300 395 15300
POOZHITHODE KSEB HYDRO-HYDRO 480 1045 15300
Page 38
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) PEECHI KSEB HYDRO-HYDRO 125 040 15300
RANI-PERUNADU KSEB HYDRO-HYDRO 400 585 15300
SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 79783 15300
SENGULAM HPS KSEB HYDRO-HYDRO 5120 11558 15300
SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 16711 15300
VILANGAD KSEB HYDRO-HYDRO 750 1578 15300
BARAPOLE KSEB HYDRO-HYDRO 1500 1932 15300
VELLATHOOVAL KSEB HYDRO-HYDRO 360 305 15300
CHIM0NY KSEB HYDRO-HYDRO 250 156 15300
ADYANPARA KSEB HYDRO-HYDRO 350 501 15300
BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 554 15300
KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 3801 15300
KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 23132 32800
ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 14416 62280
METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 523970 62280
METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 321270 62280
NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 336575 62280
NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 591240 62280
TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 508966 62280
KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 30897 62280
VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 18720 90699 62280
KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 33593 62280
BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 1047 62280
PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 1250 62280
PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 330 62280
MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 4897 62280
MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 032 62280
KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15681 62280
KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 40608 62280
KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 21342 62280
KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 4717 62280
KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4322 62280
KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2399 62280
METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 4416 62280
METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 8035 62280
BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2187 62280
BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2359 62280
BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2511 62280
BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 1949 62280
BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 1819 62280
POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 172 62280
SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 241 62280
MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 026 62280
THIRUMOORTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 136 62280
PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 9309 62280
VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 353 62280
SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 4192 62280
PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 6571 62280
SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 1186 62280
SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6319 62280
ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 6122 62280
KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 28674 62280
SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 18381 62280
SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 4258 62280
KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 12680 62280
KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4201 62280
ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 000 62280
PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 19175 62280
AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 078 62280
BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 504 62280
BHAVANI KATTALAI (BKB)(IIIampIII BB I amp II)TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 5847 62280
PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 000 62280
Page 39
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) SRI DAMODARAM STPS APPDCL THERMAL-COAL 160000 808108 36300
PRIVATE SECTOR
KARUPPUR TANJORE LANCO TANJORE PCL THERMAL-GAS 12000 48096 28770
SIMHAPURI ENERGY LTD SIMHAPURI ENERGY LTD THERMAL-COAL 60000 143900 39100
JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 7111 45500
SBU 1 JSW ENERGY LTD
VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 26000 159100
43300
SBU 2 JSW ENERGY LTD
VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 60000 247900
42800
LANCO KPLLANCO KONDAPALLI POWER
LTDTHERMAL-GAS 36814 85060
25776
LANCO KPL STG -IILANCO KONDAPALLI POWER
LTDTHERMAL-GAS 36600 12979
46330
LANCO KPL STG -IIIALANCO KONDAPALLI POWER
LTDTHERMAL-GAS 37100 85710
46330
LANCO KPL STG -III BLANCO KONDAPALLI POWER
LTDTHERMAL-GAS 37100 43639
46330
HINDUJA NATIONAL PCL HINDUJA NATIONAL PCL THERMAL-COAL 104000 303000 38200
MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 121164 49940
UDUPI POWER COR LTD ADANI POWER LTD THERMAL-COAL 120000 754613 42500
SPECTRUM POWER GENERATION
LTD SPECTRUM PG LTD THERMAL-GASN 20525 9256812
34952
TAQA NEYVELI POWER COM PVT
LTD TAQA NEYVELI THERMAL-LIG 25000 5840
34500
ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 251000 51000
ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 207860 36800
GMR VEMAGIRI POWER GENERATION
LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 30117
46450
EASTERN REGION
CENTRAL SECTOR
MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 64675 53113
MTPS STAGE - II KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 39000 1432 69138
BOKARO `B` TPS DVC THERMAL-COAL 63000 145670 31539
MEJIA TPS U 1-3 DVC THERMAL-COAL 63000 348298 31552
MEJIA TPS U 4 DVC THERMAL-COAL 21000 116099 34997
MEJIA TPS U 5-6 DVC THERMAL-COAL 50000 276427 35976
MEJIA TPS U 7-8 DVC THERMAL-COAL 100000 552854 36991
DURGAPUR STEEL TPS DVC THERMAL-COAL 100000 665550 39323
DURGAPUR TPS DVC THERMAL-COAL 21000 59270 35416
RAGHUNATHPUR TPS DVC THERMAL-COAL 120000 201650 35326
MAITHON HYDEL STA DVC HYDRO-HYDRO 6320 12200 17984
CHANDRAPURA TPSU1-3 DVC THERMAL-COAL 42000 257610 35095
CHANDRAPURA TPSU7-8 DVC THERMAL-COAL 50000 306673 34987
KODERMA TPS DVC THERMAL-COAL 100000 380180 38131
PANCHET HPS DVC HYDRO-HYDRO 8000 13360 17984
TILLAYA HPS DVC HYDRO-HYDRO 400 1410 17984
RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34700 35400
TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 277300 23200
TLDP -III NHPC LTD HYDRO-HYDRO 13200 55400 62000
TLDP -IV NHPC LTD HYDRO-HYDRO 16000 60300 25600
FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 957219 33700
FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 308943 41000
BONGAINGAON TPS NTPC LTD THERMAL-COAL 25000 153663 58600
KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 542277 34200
KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 942591 34200
BARH-II NTPC LTD THERMAL-COAL 132000 728021 44500
TALCHER TPS NTPC LTD THERMAL-COAL 46000 335521 30100
TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 702319 25600
TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1436521 24700
STATE SECTOR
BTPS(RampM) BIHAR STATE PGCL THERMAL-COAL 22000 12142 39700
BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 98331 10602
HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 50593 9482
CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 19689 2605
RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 53192 6033
UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 147208 14637
Page 40
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 60353 4519
IB TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 288567 25000
J P H GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 210 038 61100
MEYONG CHU GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 400 1086 61100
TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 122667 38200
DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 214339 43321
KOLAGHAT THERMAL POWER
STATION
WEST BENGAL PDCL THERMAL-COAL 126000 538269 31603
BAKRESHWAR THERMAL POWER
PLANT
WEST BENGAL PDCL THERMAL-COAL 105000 634876 32154
BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 45000 166855 33299
SANTHALDIH THERMAL POWER
STATION
WEST BENGAL PDCL THERMAL-COAL 50000 336442 34932
SAGARDIGHI THERMAL POWER
PROJECT
WEST BENGAL PDCL THERMAL-COAL 160000 423121 34705
JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 20344 68900
RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 24559 68900
TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 4623 68900
PURULIA PUMPED STORAGE
PROJECT
WEST BENGAL SEDCL HYDRO-HYDRO 90000 108816 68900
MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2768 68900
PRIVATE SECTOR
CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 49474 20230
CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 555500 70200
HALDIA ENERGY HALDIA ENERGY LTD THERMAL-COAL 60000 371000 50400
DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3688 63400
KAMALANGA TPS GMR KAMALANGA ENERGY LTD THERMAL-COAL 105000547670
33300
ADHUNIK POWER U-1 ADHUNIK POWER THERMAL-COAL 27000 158 44060
ADHUNIK POWER U-2 ADHUNIK POWER THERMAL-COAL 27000 168 44250
VL-JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 332800 23622
JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 43000 45250
JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 71700 37030
JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 70700 35920
JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 71100 38870
JOJOBERA UNIT 5 TATA POWER COM LTD THERMAL-COAL 12000 79300 44560
JOJOBERA UNIT 6 TATA POWER COM LTD THERMAL-WHR 12000 83700 12840
IEL KALINGANAGAR U-I TATA POWER COM LTD THERMAL-WG 6750 33400 22500
IEL KALINGANAGAR U-II TATA POWER COM LTD THERMAL-WG 6750 34800 22500
MAITHON UNIT 1 amp 2 TATA POWER COM LTD THERMAL-COAL 105000 678000 36100
HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 27500 24340
HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 28400 24340
HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 15800 24310
NORTH EASTERN REGION
CENTRAL SECTOR
LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 74100 36600
AGARTALA GT NEEPCO THERMAL-GAS 13500 88611 27210
ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 153111 32310
DOYANG HEP NEEPCO HYDRO-HYDRO 7500 25598 49801
KOPILI HEP NEEPCO HYDRO-HYDRO 20000 98186 11491
KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 19582 20237
KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 10310 17968
RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 124093 22945
TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 10100 17344 39000
STATE SECTOR
HYDRO POWER (122 Stns) ITANAGAR GOVT OF ARUNACHAL
PRADESHHYDRO-HYDRO 6971 6217270
24600
KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39514 17337
LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 82327 36810
NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 33318 48290
MYNTRIANG SHEP ST II ASSAM POWER GENCO HYDRO-HYDRO 300 567 35776
LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 9130 49200
LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 012 49200
DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 022 49200
TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 000 49200
UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 4990 16000
UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 6476 37000
UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 16494 14600
UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 3600 9556 15000
SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 758 8000
MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44070 44800
KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 154 41400
TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 091 41400
MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 411 41400
MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 394 41400
KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 760 41400
SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 3264 41400
LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 044 41400
BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 18953 28000
ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 43585 28200
GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 4080 11100
Note
LIG Lignite N Naptha WHR Waste Heat Recovery
Page 41
File NoCEA-CH-14-1142018-Coordination Division
अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met
कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )
चडीगढ़ Chandigarh 217 217 0 00 369 369 0 00
दिलली Delhi 4713 4713 0 00 7016 7016 0 00
हरियजणज Haryana 7948 7948 0 00 10270 10270 0 00
दहमजचल परिश Himachal Pradesh 1520 1520 0 00 1520 1520 0 00
रमम कशमीि Jammu amp Kashmir 2836 2269 567 200 2951 2361 590 200
परजब Punjab 7979 7979 0 00 12638 12638 0 00
िजरसथजन Rajasthan 11450 11450 0 00 11698 11698 0 00
उतति परिश Uttar Pradesh 17434 16745 688 39 20498 20062 436 21
उततिजखड Uttarakhand 1943 1943 0 00 2143 2143 0 00
उततरी कषतर Northern Region 50659 49635 1024 20 63166 61726 1440 23
छततीसगढ़ Chhattisgarh 4414 4268 146 33 4414 4268 146 33
गरिजत Gujarat 18148 18130 19 01 18148 18130 19 01
मधय परिश Madhya Pradesh 11356 11317 39 03 11356 11317 39 03
महजिजषटर Maharashtra 23864 23159 705 30 23864 23254 610 26
िमन औि दिउ Daman amp Diu 342 341 1 02 357 356 1 02
िजिि व नगि हवली Dadra amp Nagar Haveli 784 780 4 05 816 815 1 01
गोवज Goa 536 536 0 00 596 596 0 00
पशचिमी कषतर Western Region 56548 55695 853 15 56548 55695 853 15
आनधर परिश Andhra Pradesh 9435 9435 0 00 9435 9435 0 00
तलगजनज Telangana 10603 10603 0 00 10815 10815 0 00
कनजाटक Karnataka 10741 10741 0 00 10741 10741 0 00
किल Kerala 3727 3644 83 22 4050 3997 53 13
तममल नजड Tamil Nadu 14747 14333 414 28 15029 14981 47 03
पडचिी Puducherry 363 362 1 03 420 400 19 46
लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0
दकषकषणी कषतर Southern Region 45279 45226 53 01 45946 45684 262 06
बबहजि Bihar 4945 4945 0 00 5050 5045 5 01
िजमोिि घजटी ननगम DVC 2729 2729 0 00 2874 2874 0 00
झजिखणड Jharkhand 1260 1260 0 00 1339 1284 55 41
ओडडशज Odisha 5624 5224 400 71 5624 5357 268 48
पशशचम बगजल West Bengal 8775 8775 0 00 9130 9123 7 01
मसशककम Sikkim 86 86 0 00 90 90 0 00
अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7
परवी कषतर Eastern Region 22959 22567 392 17 22959 22567 392 17
अरणजचल परिश Arunachal Pradesh 138 125 13 94 138 133 5 37
असम Assam 1785 1704 81 45 1865 1809 56 30
मणणपि Manipur 187 185 2 11 193 186 7 36
मघजलय Meghalaya 336 336 0 00 371 368 2 07
ममज़ोिम Mizoram 99 97 2 20 103 98 4 41
नजगजलड Nagaland 134 131 3 22 156 138 18 117
बिपिज Tripura 269 269 0 00 298 293 5 17
उततर-परवी कषतर North-Eastern Region 2790 2700 90 32 2967 2850 117 39
समपणण भारत All India 172945 170604 2341 14 177022 175528 1494 08
24
अधिकतम वरवदयत आपरतण शथिरत ररपोरण (परवाणरवलोकन) Peak Power Supply Position Report (Provisional)
आकड़ मगज वजट नट Figures in MW netअपरल2018 -अकरबर2018 April2018 to October2018
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
मजग की पनता म कमी Demand not Met
Excludes the supply to Bangladesh
राजयStateअकरबर2018 October2018
मजग की पनता म कमी Demand not Met
File NoCEA-CH-14-1142018-Coordination Division
आकड़ मममलयन यननट नट Figures in MU net
ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied
कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )
चडीगढ़ Chandigarh 141 141 0 00 947 947 0 00
दिलली Delhi 2925 2924 1 00 20034 20021 13 01
हरियजणज Haryana 4794 4794 0 00 30651 30651 0 00
दहमजचल परिश Himachal Pradesh 876 853 24 27 4940 4773 167 34
रमम कशमीि Jammu amp Kashmir 1520 1246 274 180 9485 7646 1839 194
परजब Punjab 5575 5575 0 00 34414 34401 13 00
िजरसथजन Rajasthan 6202 6201 0 00 38594 38434 160 04
उतति परिश Uttar Pradesh 10211 10124 86 08 65349 64836 513 08
उततिजखड Uttarakhand 1162 1149 13 11 7311 7229 82 11
उततरी कषतर Northern Region 33405 33008 398 12 211725 208939 2786 13
छततीसगढ़ Chhattisgarh 2403 2388 15 06 13665 13638 27 02
गरिजत Gujarat 10122 10122 0 00 59146 59132 14 00
मधय परिश Madhya Pradesh 5492 5491 1 00 32552 32551 1 00
महजिजषटर Maharashtra 13615 13612 3 00 80266 80260 6 00
िमन औि दिउ Daman amp Diu 221 221 0 00 1306 1306 0 00
िजिि व नगि हवली Dadra amp Nagar Haveli 551 551 0 00 3204 3204 0 00
गोवज Goa 339 339 0 00 2131 2128 2 01
पशचिमी कषतर Western Region 32742 32723 19 01 192270 192220 50 00
आनधर परिश Andhra Pradesh 5294 5287 7 01 31518 31480 37 01
तलगजनज Telangana 6279 6272 8 01 31503 31463 40 01
कनजाटक Karnataka 5701 5693 8 01 33269 33225 45 01
किल Kerala 2050 2026 24 12 12140 12063 76 06
तममल नजड Tamil Nadu 8971 8959 12 01 57131 57065 66 01
पडचिी Puducherry 226 224 2 08 1438 1431 7 05
लकष-दवीप Lakshadweep 4 4 0 0 23 23 0 0
दकषकषणी कषतर Southern Region 28520 28460 60 02 166998 166727 271 02
बबहजि Bihar 2839 2793 46 16 16400 16213 188 11
िजमोिि घजटी ननगम DVC 1901 1750 151 79 11384 11130 254 22
झजिखणड Jharkhand 740 723 17 22 4321 4252 69 16
ओडडशज Odisha 2921 2918 3 01 17077 17058 19 01
पशशचम बगजल West Bengal 4902 4879 23 05 28804 28681 123 04
मसशककम Sikkim 39 39 0 01 239 239 0 01
अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 67 173 162 12 67
परवी कषतर Eastern Region 13341 13102 240 18 78225 77573 652 08
अरणजचल परिश Arunachal Pradesh 74 73 1 10 435 429 6 14
असम Assam 950 914 36 38 5320 5094 226 43
मणणपि Manipur 70 69 1 11 414 408 6 15
मघजलय Meghalaya 150 150 0 01 896 896 0 01
ममज़ोिम Mizoram 58 57 1 12 302 297 5 16
नजगजलड Nagaland 80 72 8 104 464 414 50 108
बिपिज Tripura 192 191 1 07 895 878 17 19
उततर-परवी कषतर North-Eastern Region 1575 1527 48 31 8726 8415 311 36
समपणण भारत All India 109584 108819 765 07 657944 653873 4071 06
Energy not Supplied Energy not Supplied
ससतबर2018 September2018 अपरल2018 -ससतबर2018 April2018 to September2018
ऊरजा पनत ा म कमी ऊरजा पनत ा म कमी
Excludes energy exported to Bangladesh
राजयState
ऊराण वरवदयत आपरतण शथिरत ररपोरण (सशोधित) Energy Power Supply Position Report (Revised)
25
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
File NoCEA-CH-14-1142018-Coordination Division
अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met
कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )
चडीगढ़ Chandigarh 293 293 0 00 369 369 0 00
दिलली Delhi 5358 5358 0 00 7016 7016 0 00
हरियजणज Haryana 9008 9008 0 00 10270 10270 0 00
दहमजचल परिश Himachal Pradesh 1466 1466 0 00 1479 1479 0 00
रमम कशमीि Jammu amp Kashmir 2951 2361 590 200 2951 2361 590 200
परजब Punjab 11405 11405 0 00 12638 12638 0 00
िजरसथजन Rajasthan 10612 10612 0 00 11698 11698 0 00
उतति परिश Uttar Pradesh 18346 18121 225 12 20498 20062 436 21
उततिजखड Uttarakhand 1996 1996 0 00 2143 2143 0 00
उततरी कषतर Northern Region 56407 55649 758 13 63166 61726 1440 23
छततीसगढ़ Chhattisgarh 4404 4075 328 75 4404 4136 268 61
गरिजत Gujarat 16963 16963 0 00 17053 16963 90 05
मधय परिश Madhya Pradesh 8811 8771 41 05 8811 8775 36 04
महजिजषटर Maharashtra 22455 22349 106 05 23395 23254 141 06
िमन औि दिउ Daman amp Diu 357 356 1 02 357 356 1 02
िजिि व नगि हवली Dadra amp Nagar Haveli 816 815 1 01 816 815 1 01
गोवज Goa 596 596 0 00 596 596 0 00
पशचिमी कषतर Western Region 52933 52895 38 01 53841 52895 945 18
आनधर परिश Andhra Pradesh 9435 9416 19 02 9435 9416 19 02
तलगजनज Telangana 10815 10815 0 00 10815 10815 0 00
कनजाटक Karnataka 10103 10090 13 01 10690 10688 2 00
किल Kerala 3888 3638 251 64 4050 3997 53 13
तममल नजड Tamil Nadu 14556 14553 3 00 15029 14981 47 03
पडचिी Puducherry 390 372 17 45 420 400 19 46
लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0
दकषकषणी कषतर Southern Region 45542 45428 114 02 45946 45684 262 06
बबहजि Bihar 5050 5045 5 01 5050 5045 5 01
िजमोिि घजटी ननगम DVC 2641 2641 0 00 2874 2874 0 00
झजिखणड Jharkhand 1233 1233 0 00 1339 1284 55 41
ओडडशज Odisha 4906 4906 0 00 5357 5357 0 00
पशशचम बगजल West Bengal 8644 8639 5 01 9130 9123 7 01
मसशककम Sikkim 78 78 0 00 90 90 0 00
अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7
परवी कषतर Eastern Region 22110 22100 10 00 22470 22290 180 08
अरणजचल परिश Arunachal Pradesh 132 130 2 15 138 133 5 37
असम Assam 1865 1809 56 30 1865 1809 56 30
मणणपि Manipur 184 182 2 13 193 186 7 36
मघजलय Meghalaya 317 317 0 00 371 368 2 07
ममज़ोिम Mizoram 95 93 2 23 103 98 4 41
नजगजलड Nagaland 142 138 5 32 156 138 18 117
बिपिज Tripura 296 293 3 10 298 293 5 17
उततर-परवी कषतर North-Eastern Region 2921 2850 71 24 2967 2850 117 39
समपणण भारत All India 177022 175528 1494 08 177022 175528 1494 08
26
मजग की पनता म कमी मजग की पनता म कमी Demand not MetDemand not Met
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
Excludes the supply to Bangladesh
अधिकतम वरवदयत आपरतण शथिरत ररपोरण (सशोधित) Peak Power Supply Position Report (Revised)
आकड़ मगज वजट नट Figures in MW net
राजयStateससतबर2018 September2018 अपरल2018 -ससतबर2018 April2018 to September2018
File NoCEA-CH-14-1142018-Coordination Division
अकरबर2018 October2018अपरल2018 -अकरबर2018 April2018 to October2018
उततरी कषतर Northern Region
चडीगढ़ Chandigarh Data not received Data not received
दिलली Delhi
हरियजणज Haryana
दहमजचल परिश Himachal Pradesh
रमम कशमीि Jammu amp Kashmir Data not received Data not received
परजब Punjab
िजरसथजन Rajasthanउतति परिश Uttar Pradesh
उततिजखड Uttarakhand
पशचिमी कषतर Western Region
छततीसगढ़ Chhattisgarh
गरिजत Gujarat
मधय परिश Madhya Pradesh
महजिजषटर Maharashtra
गोवज Goa
दकषकषणी कषतर Southern Region
आनधर परिश Andhra Pradesh
तलगजनज Telangana
कनजाटक Karnataka
किल Kerala
तममल नजड Tamil Nadu
पडचिी Puducherryपरवी कषतर Eastern Region
बबहजि Bihar
झजिखणड Jharkhand
ओडडशज Odisha
पशशचम बगजल West Bengal
N
o No
tified
Cuts
N
o No
tified
Cuts
27
अकरबर 2018 म इडथरीर पर वरवदयत करौती का वरवरवरण Notified Power CutsRestrictions on Industries during October2018
राजय कषतर State Regionऊराणमाग करौती EnergyDemand Cut
No Notified Cuts No Notified Cuts
File NoCEA-CH-14-1142018-Coordination Division
अकरबर2018 October2018अपरल2018 -अकरबर2018 April2018 to October2018
उततरी कषतर Northern Region
चडीगढ़ Chandigarh Data not received Data not received
दिलली Delhi Data not received Data not received
हरियजणज Haryana 940 hrsday 0709 - 0950 hrsday
दहमजचल परिश Himachal Pradesh No cut imposed on agriculture consumers and uninterrupted
power is being supplied to agriculture sector
HPSEBL has only 2 agriculture consumers and uninterrupted
power is being supplied to agriculture sector
रमम कशमीि Jammu amp Kashmir Data not received Data not received
परजब Punjab 0507 hrsday 0349 - 0844 hrsday
िजरसथजन Rajasthan 0630 hrsday 0630 hrsday
उतति परिश Uttar Pradesh 1825 hrsday 1814 - 1858 hrsday
उततिजखड Uttarakhand 2350 hrsday 2128 - 2357 hrsday
पशचिमी कषतर Western Region
छततीसगढ़ Chhattisgarh 18hoursday 18 hrsday
गरिजत Gujarat 805 hrsday 805 hrsday
मधय परिश Madhya Pradesh Three-Phase Supply(Irrigation)-947 hrs day
Three-Phase (Mixed) Supply - 2311 hrs day
Three-Phase Supply(Irrigation)- 0933 - 0947 hrs day Three-
Phase (Mixed) Supply - 2300 - 2320 hrs day
महजिजषटर Maharashtra Three-Phase Supply(Irrigation)- 9 hrs day
Three-Phase (Mixed) Supply - 24 hrs day
Three-Phase Supply(Irrigation)- 9 hrs day
Three-Phase (Mixed) Supply - 24 hrs day
गोवज Goa No restriction No restriction
दकषकषणी कषतर Southern Region
आनधर परिश Andhra Pradesh 07 hrsday 07 hrsday
तलगजनज Telangana 24 hoursday 24 hoursday
कनजाटक Karnataka 6 hrsday 6 hrsday
किल Kerala No Restrictions No Restrictions
तममल नजड Tamil Nadu 9 hrsday (6 hrs during day time and 3 hrs during night time) 9 hrsday (6 hrs during day time and 3 hrs during night time)
पडचिी Puducherry No Restrictions No Restrictions
परवी कषतर Eastern Region
बबहजि Bihar About 18 hrsday About 18 hrsday
झजिखणड Jharkhand About 20 hrsday About 20 hrsday
ओडडशज Odisha 24 hrsday 24 hrsday
पशशचम बगजल West Bengal About 23 hrsday About 23 hrsday
28
अकटबर 2018 कषि कषतर को षिदयत आपरति का षििरण Power Supply to Agricultural Sector during October2018
राजय कषतर State Regionऔसत वरवदयत आपरतण घनरो म Average Hours of Supply
On segregated feeders
File NoCEA-CH-14-1142018-Coordination Division
SNo Contents Page
1 Growth of Installed Capacity since 6th Plan 29
2 Progress of Transmission Sector since 6th Plan 30
3 All India Yearly Coal consumption for Power Generation (Utilities)
4 All India Annual Per Capita Consumption of Electricity since -2006
5 Average cost of power supply amp Average realisation (Paisakwh)
6 Growth of Rural Electrification amp Pump Sets Energisation
7 Status of Hydro Schemes Cleared by the CEA in Oct-2018
Section G - Growth of Power Sector
31
32
File NoCEA-CH-14-1142018-Coordination Division
(In MW)
Coal Gas Diesel Total
End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472
End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634
End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537
End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596
End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921
End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703
End of 12th Plan 19216288 2532938 83763 21832988 6780 4447842 50018 31960630
Up to Oct-2018 19599250 2493722 837629 22176734 6780 4548742 7201281 34604757
Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-17) = 51529 MW
Electricity Generation (MU) Targets and Achievements for 2016-17
Coal Gas Diesel Nuclear Hydro Res Total
1959925 2493722 837629 678000 454874 72012805 22925174
29
1 Growth of Installed Capacity Since 6th Plan
Plan YearThermal
Nuclear Hydro RES (MNRE) Total
Total Installed Capacity 34604757 MW
Coal Gas Diesel Nuclear Hydro Res
File NoCEA-CH-14-1142018-Coordination Division
Progress of Transmission Sector in the Country up to Oct 2018
1 TRANSMISSION LINES (All fig in CKM)
At the end of
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
6th plan 0 0 0 0 0 0 0 0 0 0 0 0 1831 4198 0 6029 1641 44364 0 46005 3472 48562 0 52034
7th plan 0 0 0 0 0 0 0 0 0 0 0 0 13068 6756 0 19824 4560 55071 0 59631 17628 61827 0 79455
8th plan 0 0 0 0 1634 0 0 1634 0 0 0 0 23001 13141 0 36142 6564 73036 0 79600 31199 86177 0 117376
9th plan 0 0 0 0 3234 1504 0 4738 751 409 0 1160 29345 20033 0 49378 8687 88306 0 96993 42017 110252 0 152269
10th plan 0 0 0 0 4368 1504 0 5872 1775 409 0 2184 48708 24730 0 73438 9444 105185 0 114629 64295 131828 0 196123
11th Plan 0 0 0 0 5948 1504 1980 9432 4839 411 0 5250 71023 30191 5605 106819 10140 125010 830 135980 91950 157116 8415 257481
12th Plan 6124 0 0 6124 5948 1504 1980 9432 25465 1177 4598 31240 92482 48240 17065 157787 11014 151276 978 163268 141033 202197 24621 367851
13th Plan (Up
to Mar2018)6124 0 0 6124 5948 1504 1980 9432 28666 1512 4881 35059 98247 54286 19067 171600 11258 156497 1000 168755 150243 213799 26928 390970
13th Plan (Up
to Sep-18)6124 0 0 6124 5948 1504 1980 9432 30952 1512 5059 37523 99683 56069 20662 176414 11318 160958 1000 173276 154025 220043 28701 402769
27150
75050
47900
118050
90650
30
IR addition in 12th Plan (up to
March 2017)
Total IR (up to Oct-18)
IR at the end of 11th Plan
IR at the end of 12th Plan
Envisaged IR Capacity at the end
of 13th Plan
Grand Total
Note - The figure upto the end of 10th plan in for stringing progress including the lines not commissioned Now only commissioned lines are reckoned Accordingly the figure for 10th plan (end) may read as 187555 after adjusting with (-) 10852 Ckm
Inter-regional Power Transfer Capacity
plusmn 800 kV HVDC plusmn 500 kV HVDC 765 kV 400 kV 220 kV
File NoCEA-CH-14-1142018-Coordination Division
2004-05 27800
2005-06 28100
2006-07 30200
2007-08 33000
2008-09 35500
2009-10 36700
2010-11 38700
2011-12 41756
2012-13 45460
2013-14 48940
2014-15 53040
2015-16 54590
2016-17 57430
2017-18 60800
Year
2005-06
2006-07
2007-08
2008-09
2009-10
2010-11
2011-12
2012-13
2013-14
2014-15
2015-16
2016-17
2017-18
2004-05 254 209 7568
2005-06 260 221 7636
2006-07 276 227 7423
2007-08 293 239 7727
2008-09 340 263 8713
2009-10 355 268 8870
2010-11 398 303 11975
2011-12 455 330 13514
2012-13 501 376 14867
2013-14 518 175
2014-15 520
6719
7171
3 All India yearly Coal Consumption for Power Generation (Utilities)
YEARCoal Consumption
Million Tonnes
4 All India Annual per Capita consumption of Electricity Since 2006
Per Capita Consumption ( kWh)
6314
(GrossGen+ Net Import) Mid-year population
5 Average cost of power supply amp average realization ( paiseKWH )
Yearcost of supply
(paiseunit)
Realization(paiseunit)
Including AgricultureOnly
Agriculture
1149
7335
7786
91441
8188
88363
957
1010
1075
1122
File NoCEA-CH-14-1142018-Coordination Division
Source- PFC Reports on the performance of State Power Utilities 31
File NoCEA-CH-14-1142018-Coordination Division
Sl
NoExecuting Agency
Installed
Capacity (MW)Cost (Rs crore)
Date of
Clearance
32
No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification
since 2004-05
65291374575 296361511th Plan
Cumu upto End of 11th Plan
596556 21212860
557439Cummulative up to end of 12th Plan
46708
18423975
499150
2003-042004-05
5743
9769
Cumu upto End of 10th Plan
010407 to 310308
010410 to 310311557976840909
010411 to 310312
412667
86293726
3207
482864
12632
1576036
4451722594
15455554
2314176
397343611750
2093311060316074
65109527813884
6 Growth Of Rural Electrification amp Pumpsets Energisation
Plan Year
9th Plan2002-03
134092626
4111
Pump Sets Energised Villages Electricfied (Nos)
2001-02
284064367244
1218
27801997-981998-991999-002000-01
297594
010408 to 310309010409 to 310310
10th Plan
2005-062006-07
322968331020
Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as
Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received
from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made
available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified
villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is
independent of the earlier published reports
No Hydro Electric Project has been issued concurrenceAppraisal letter by CEA during October 2018
7 Status of Hydro Schemes Cleared by the CEA in Oct-2018
Name of Scheme
File NoCEA-CH-14-1142018-Coordination Division
SN Contents Page
1 Rate of sale of power for the year 2016-17 33-41
RATE OF SALE OF POWER FOR THE YEAR 2016-17
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) NORTHERN REGION
CENTRAL SECTOR
BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 18000 66900 19800
CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 54000 222400 21600
CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 30000 144400 19600
CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 23100 91700 42600
PARBATI - III HPS NHPC LTD HYDRO-HYDRO 52000 68200 54800
DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 28000 95600 30000
CHUTAK NHPC LTD HYDRO-HYDRO 4400 22000 79800
DULHASTI HPS NHPC LTD HYDRO-HYDRO 39000 228000 56400
SALAL HPS NHPC LTD HYDRO-HYDRO 69000 342300 11000
TANAKPUR HPS NHPC LTD HYDRO-HYDRO 9420 43000 29600
URI HPS -I NHPC LTD HYDRO-HYDRO 48000 280300 16000
URI HPS - II NHPC LTD HYDRO-HYDRO 24000 147300 48600
NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 4500 24600 88200
SEWA - II NHPC LTD HYDRO-HYDRO 12000 47100 43400
ANTA CCPP NTPC LTD THERMAL-GASN 41930 67539 32400
AURAIYA CCPP NTPC LTD THERMAL-GASN 66336 53501 39100
BADARPUR TPS NTPC LTD THERMAL-COAL 70500 159153 44800
DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 84000 296170 42300
DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 98000 526686 46300
DADRI CCPP NTPC LTD THERMAL-GASHSD 82978 227469 33000
FARIDABAD CCPP NTPC LTD THERMAL-GASN 43159 115577 30800
RIHAND STPS I NTPC LTD THERMAL-COAL 100000 596766 24500
RIHAND STPS II NTPC LTD THERMAL-COAL 100000 737069 24600
RIHAND STPS III NTPC LTD THERMAL-COAL 100000 706546 30600
SINGRAULI STPS NTPC LTD THERMAL-COAL 200000 1394068 20400
TANDA TPS NTPC LTD THERMAL-COAL 44000 295438 40800
UNCHAHAR TPS I NTPC LTD THERMAL-COAL 42000 256454 39800
UNCHAHAR TPS II NTPC LTD THERMAL-COAL 42000 273577 38900
UNCHAHAR TPS III NTPC LTD THERMAL-COAL 21000 142780 43000
KOLDAM NTPC LTD HYDRO-HYDRO 80000 363260 43600
NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 303575 25841
RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 108000 668677 35374
NJHPS SJVNL HYDRO-HYDRO 150000 699496 23820
RAMPUR HPS SJVNL HYDRO-HYDRO 41202 195982 32260
TEHRI HPP THDC HYDRO-HYDRO 100000 272543 51800
KOTESHWAR HEP THDC HYDRO-HYDRO 40000 106244 53400
IGSTPS JHAJJAR ARAVALI P CPL THERMAL-COAL 150000 510429 49490
NEYVELI BARSINGSAR NEYVELI LIG CORP LTD THERMAL-LIG 25000 127520 38040
STATE SECTOR
PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 21000 14222 48200
PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 21000 19205 48400
PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 25000 102257 42600
PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 25000 62107 41800
DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 60000 312213 41000
RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 120000 35767442200
WYC HYDEL STATION HPGCL HYDRO-HYDRO 6240 20365 24900
GIRI POWER HOUSE HPSEB HYDRO-HYDRO 6000 13958 7600
ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 1695 5467 11900
BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 12000 18528 6700
GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 2250 7462 22500
BASSI POWER HOUSE HPSEB HYDRO-HYDRO 6600 29649 7500
BINWA POWER HOUSE HPSEB HYDRO-HYDRO 600 2749 19300
ANNEXURE-I
RATE OF SALE OF POWER FOR THE YEAR 2016-2017
Page 33
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) GAJ POWER HOUSE HPSEB HYDRO-HYDRO 1050 2914 26700
BANER POWER HOUSE HPSEB HYDRO-HYDRO 1200 2864 16200
HOLI POWER HOUSE HPSEB HYDRO-HYDRO 300 616 22500
THIROT POWER HOUSE HPSEB HYDRO-HYDRO 450 1126 22500
KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 1200 3064 22500
LARJI POWER HOUSE HPSEB HYDRO-HYDRO 12600 53677 23700
NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 250 750 31000
CHABA POWER HOUSE HPSEB HYDRO-HYDRO 175 465 23300
RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 150 101 13400
SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 200 000 22500
KILLAR HPSEB HYDRO-HYDRO 030 050 22500
BHABA AUGUMENP H HPSEB HYDRO-HYDRO 450 1276 22500
BS CHAMBA HPSEB HYDRO-HYDRO 045 099 19500
GUMMA HPSEB HYDRO-HYDRO 300 423 22500
GAS TURBINE POWER STATION IPGCL THERMAL-GAS 27000 67233 39300
PPS-I PPCL THERMAL-GAS 33000 175905 38300
PPS-III PPCL THERMAL-GAS 137120 196879 36100
LOWER JHELUM JampKPDD HYDRO-HYDRO 10500 60214 5100
UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 2260 10514 6300
UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 10500 44202 8500
GANDHARBAL JampKPDD HYDRO-HYDRO 1500 8925 4700
KARNAH MPH JampKPDD HYDRO-HYDRO 200 1122 31000
CHENANI I JampKPDD HYDRO-HYDRO 2330 10892 6600
CHENANI II JampKPDD HYDRO-HYDRO 200 1188 9300
CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 750 3634 14200
IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 375 2108 18500
IGO MERCHELLONG JampKPDD HYDRO-HYDRO 300 1572 29700
PAHALGAM MHP JampKPDD HYDRO-HYDRO 450 1713 32900
MARPACHOO JampKPDD HYDRO-HYDRO 075 375 29800
HAFTAL JampKPDD HYDRO-HYDRO 100 483 28700
SANJAK JampKPDD HYDRO-HYDRO 126 441 36000
SEWA-III JampKPDD HYDRO-HYDRO 900 3273 20200
BHADERWAH JampKPDD HYDRO-HYDRO 150 935 8900
BAZGO JampKPDD HYDRO-HYDRO 030 108 33300
SUMOOR JampKPDD HYDRO-HYDRO 010 045 35400
HUNDER JampKPDD HYDRO-HYDRO 040 176 26200
STAKNA JampKPDD HYDRO-HYDRO 400 1933 4100
KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 124000 662879 31360
SURATGARH TPS RRVUNL THERMAL-COAL 150000 402328 41730
CHHABRA TPS 1amp 2 RRVUNL THERMAL-COAL 50000 305946 36700
CHHABRA TPS 3 RRVUNL THERMAL-COAL 25000 151536 36700
CHHABRA TPS 4 RRVUNL THERMAL-COAL 25000 155896 36700
RAMGARH GT POWER PROJECT RRVUNL THERMAL-COAL 22050 43177 41800
RAMGARH GAS T P PROJECT 3 RRVUNL THERMAL-GAS 5000 93615 41800
DHOLPUR C C POWER PROJECT RRVUNL THERMAL-R-LNG 33000 9486 46110
MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 14000 20855 34192
MINI MICRO HYDEL (MMH) P S RRVUNL HYDRO-HYDRO 2385 851 37800
KALISINDH TPP 1 RRVUNL THERMAL-COAL 60000 341543 45000
KALISINDH TPP 2 RRVUNL THERMAL-COAL 60000 211588 45000
KHARA HEP UPJVNL HYDRO-HYDRO 7200 26654 7200
MATATILLA HEP UPJVNL HYDRO-HYDRO 3060 12219 6500
OBRA HEP UPJVNL HYDRO-HYDRO 9900 21517 6300
RIHAND UPJVNL HYDRO-HYDRO 30000 57369 5500
ANPARA A TPS UPRVUNL THERMAL-COAL 63000 317536 27000
ANPARA B TPS UPRVUNL THERMAL-COAL 100000 705605 22700
ANPARA D UPRVUNL THERMAL-COAL 100000 300158 39800
HARDUAGANJ TPS UPRVUNL THERMAL-COAL 16500 45817 49200
HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 50000 304389 46600
OBRA A TPS UPRVUNL THERMAL-COAL 28800 13158 34000
OBRA B TPS UPRVUNL THERMAL-COAL 100000 328124 21900
Page 34
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) PANKI TPS UPRVUNL THERMAL-COAL 21000 66488 50300
PARICHHA TPS UPRVUNL THERMAL-COAL 22000 38762 49400
PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 42000 231931 45600
PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 50000 276722 50400
CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 24000 70845 8290
CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 14400 75366 8390
DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 3375 9595 12080
DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 5100 18701 10520
KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4140 17359 12330
KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 12000 33001 9420
KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 3000 11953 8320
TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 9000 33983 12460
MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 30400 124510 16110
RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 19800 17897 10550
MPUR UTTARAKHAND JVNL HYDRO-HYDRO 930 5121 19200
PATHRI UTTARAKHAND JVNL HYDRO-HYDRO 2040 11636 14200
GALOGI UTTARAKHAND JVNL HYDRO-HYDRO 300 648 12500
PRIVATE SECTOR
MGTPP CLP INDIA PVT LTD THERMAL-COAL 132000 268902 41940
SHRINAGAR HEP ALAKNANDA HPCL HYDRO-HYDRO 33000 127414 48800
GAMA INFRAPROP CCPP GAMA INFRAPROP PVT THERMAL-GAS 22500 52686 47000
PPGCL (BARA) JP POWER VENTURES LTD THERMAL-COAL 198000 448200 38500
MALANA HEP MALANA PCL HYDRO-HYDRO 8600 26354 29792
MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 10000 30369 32580
ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 19200 56347 36079
KASHANG HEP H P PCL HYDRO-HYDRO 19500 5034 29200
BASPA-II HEP HBPCL HYDRO-HYDRO 30000 132769 13600
KARCHAM WANGTOO HEP HBPCL HYDRO-HYDRO 100000 434386 36600
RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 108000 582600 43700
RITHALA COMBI CY POWER PLANT TATA POWER DDL THERMAL-GAS 9480 000 11900
RAJPURA TPS NABHA POWER LTD THERMAL-GAS 140000 901484 39000
TALWANDI SABO POWER LTD TALWANDI SABO POWER LTD THERMAL-COAL 198000 636040 49548
ROJA THERMAL POWER STATION ROJA POWER SCL THERMAL-COAL 120000 727200 43400
KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 34400 63400
BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 36000 62600
MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 38200 60800
UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 37900 61500
KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 42300 58800
LALITPUR PGCL BAJAJ ENERGY PVT LTD THERMAL-COAL 198000 359400 47300
PRAYAGRAJ PGCL PRAYAGRAJ PGCL THERMAL-COAL 132000 448200 38595
KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 132000 783182 33438
WESTERN REGION
CENTRAL SECTOR
INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 100000 325333 23892
OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 52000 141663 34001
GANDHAR CCPP NTPC LTD THERMAL-GAS 65739 221924 28700
KAWAS CCPP NTPC LTD THERMAL-GASN 65620 167929 27000
KORBA I amp II NTPC LTD THERMAL-COAL 210000 1499171 20500
KORBA III NTPC LTD THERMAL-COAL 50000 358746 26600
SIPAT STPS I NTPC LTD THERMAL-COAL 198000 1479902 26800
SIPAT STPS II NTPC LTD THERMAL-COAL 100000 766549 26500
VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 126000 693142 25800
VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 100000 608781 23800
VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 100000 673475 27600
VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 100000 655924 32900
VINDHYACHAL STPS V NTPC LTD THERMAL-COAL 50000 328265 31700
MOUDA I NTPC LTD THERMAL-COAL 100000 343130 44500
MOUDA Ii NTPC LTD THERMAL-COAL 66000 40637 39900
RATNAGIRI GAS amp POWER PVT LTD RGPPL THERMAL-GAS 196708 442485 47000
KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 000 24729
TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 32000 201227 10740
Page 35
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 365122 19069
TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 787444 29324
STATE SECTOR
GSEG-HAZIRA15610 MW GUJARAT S ENEGEN LTD THERMAL-GAS 15610 1805 28200
GSEG-HAZIRA35143 MW GUJARAT S ENEGEN LTD THERMAL-GAS 35130 22276 51300
GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 21978 51800
AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 13929 26100
KORBA TPS EAST CSPGCL THERMAL-COAL 44000 198673 33880
DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 365808 27570
KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 316500 30420
HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 532878 19410
CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 515 58300
MTTPS CHAMPA U-I CSPGCL THERMAL-COAL 50000 220376 39000
MTTPS CHAMPA U-II CSPGCL THERMAL-COAL 50000 23709 10000
SHP GANGREL CSPGCL HYDRO-HYDRO 1000 2350 36790
BANGO HEP CSPGCL HYDRO-HYDRO 12000 14662 8900
MHP KORBA WEST CSPGCL HYDRO-HYDRO 170 859 38190
SIKASAR HEP CSPGCL HYDRO-HYDRO 700 418 26870
DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8843 74500
DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 19446 51500
GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 66388 71600
GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127488 41300
KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 96072 43900
KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 29841 56400
SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 184966 58800
UKAI 1-5 GSECL THERMAL-COAL 85000 204891 46900
UKAI TPS 6 GSECL THERMAL-COAL 50000 284448 48200
WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 271999 58300
WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 82808 44100
KADANA HPS GSECL HYDRO-HYDRO 24200 34433 16800
UKAI HPS GSECL HYDRO-HYDRO 30500 40585 6100
TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 123000 11500
BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 8900 10900
BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 7200 27500
JHINNA HPS MPPGCL HYDRO-HYDRO 2000 9700 18500
RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 44300 3400
GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 17300 4600
SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 4100 16900
MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 14600 27000
PENCH HPS MPPGCL HYDRO-HYDRO 16000 23700 8100
RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 3000 16900
AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 134400 35100
SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 283800 38700
SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 344600 34300
SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 111600 61600
SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 211800 58000
SSTPS PH-I MPPGCL THERMAL-COAL 120000 233100 84300
BHUSAWAL TPS MSPGCL THERMAL-COAL 142000 566258 51100
CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1365682 33700
KHAPERKHEDA MSPGCL THERMAL-COAL 134000 706207 39100
KORADI TPS MSPGCL THERMAL-COAL 62000 443206 42000
NASIK TPS MSPGCL THERMAL-COAL 63000 297275 47000
PARLI TPS MSPGCL THERMAL-COAL 113000 175934 71600
PARAS MSPGCL THERMAL-COAL 50000 267931 38700
URAN CCPP MSPGCL THERMAL-GAS 67200 320330 30600
KOYANA MSPGCL HYDRO-HYDRO 195600 328155 13100
SMALL HYDRO POWER PLANTS MSPGCL HYDRO-HYDRO 45400 93062 30500
BHIRA MSPGCL HYDRO-HYDRO 8000 10046 8400
TILLARI MSPGCL HYDRO-HYDRO 8900 10584 3100
SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 233298 20500
SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 87633 20500
PRIVATE SECTOR
Page 36
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 81282 46750
JNSTPP(JAYPEE NIGRIE) JP POWER VENTURES LTD THERMAL-COAL 132000 726695 29310
MB POWER MB POWER THERMAL-COAL 120000 345632 38310
ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 754922 28671
ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 780761 23495
ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 198000 1263784 32090
ADANI POWER MAHARA ADANI POWER LTD THERMAL-COAL 330000 1666191 34124
AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 170065 36827
SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 252035 45129
ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 458551 36000
ESSAR POWER MP LTD ESSAR POWER MP LTD THERMAL-COAL 60000 243040 28600
VEDANTA LTD (P P -I) VEDANTA LTD THERMAL-GAS 3000 15044 24000
VEDANTA LTD (P P -II) VEDANTA LTD THERMAL-GAS 3000 21293 24000
PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 8234600 24000
165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 5850 64390
145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 68717 40349
SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 132655 28776
SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 144686 38567
MUNDRA UMPPCOASTAL GUJARAT POWER
LTD THERMAL-IMP COAL 400000 2530300
23900
LANCO AMARKANTAK TPP PATHADIH
U-ILANCO AMARKAN POWER LTD THERMAL-COAL 30000 195500
29200
LANCO AMARKANTAK TPP PATHADIH
U-IILANCO AMARKAN POWER LTD THERMAL-COAL 30000 206900
27600
BARADARHA TPS D B POWER LTD THERMAL-COAL 120000 677373 29200
JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 405000 28900
JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 453000 40500
DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 339437 40700
TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 293400 44000
TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 137200 37000
TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 174900 44000
BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 92900 14100
BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23700 34300
KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 27600 48300
CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2530300 23900
BHANDARDRA HEP -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 2475 54900
SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 161400 26500
SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 445000 39000
SOTHERN REGION
CENTRAL SECTOR
NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 325699 54820
NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 305532 39880
NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 998805 38510
NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 113016 54070
NEYVELI TAMILNADU POWER LTD JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 625274 42200
VALLUR TPS NTPC TECL THERMAL-COAL 150000 856438 42350
R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 1493 84300
RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1502919 29400
RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 341291 31800
SIMHADRI I NTPC LTD THERMAL-COAL 100000 688382 36800
SIMHADRI II NTPC LTD THERMAL-COAL 100000 663657 43400
KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 593110 31324
MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 291625 21764
KKNPP-1 amp 2 NPCIL NUCLEAR-NUCLEAR 200000 572609 40948
MINICOY LAKSHADEEP THERMAL-DIESEL 340 770 29600
KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1097 29600
AMINI LAKSHADEEP THERMAL-DIESEL 265 509 29600
ANDROTT LAKSHADEEP THERMAL-DIESEL 219 524 29600
KALPENI LAKSHADEEP THERMAL-DIESEL 175 356 29600
AGATTI LAKSHADEEP THERMAL-DIESEL 195 658 29600
KADMAT LAKSHADEEP THERMAL-DIESEL 190 414 29600
KILTAN LAKSHADEEP THERMAL-DIESEL 150 269 29600
CHETLET LAKSHADEEP THERMAL-DIESEL 100 139 29600
BITRA LAKSHADEEP THERMAL-DIESEL 043 024 29600
BANGARAM LAKSHADEEP THERMAL-DIESEL 018 009 29600
Page 37
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) STATE SECTOR
Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 721811 46500
Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 50000 336142 46500
RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 237358 46500
RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 239926 46500
RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 124500 46500
SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 62109 46500
UPPER SILERU APGENCO HYDRO-HYDRO 24000 33000 46500
LOWER SILERU APGENCO HYDRO-HYDRO 46000 81066 46500
DONKARAI APGENCO HYDRO-HYDRO 2500 6007 46500
PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 1262 46500
CHETTIPETA APGENCO HYDRO-HYDRO 100 214 46500
MUCHKUND APGENCO HYDRO-HYDRO 12000 37571 46500
NAGARJUNASAGAR RCPH APGENCO HYDRO-HYDRO 9000 606 46500
TUNGABHADRA HES amp HAMPI(AP
Share)
APGENCO HYDRO-HYDRO 7200 6100 46500
KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 352232 42600
KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 288131 32500
KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 319272 46500
RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 40073 44300
KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 308317 46000
KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 308963 51300
SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 61004 76600
NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 17960 75300
PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 20873 58300
POCHAMPAD-I TSPGENCO HYDRO-HYDRO 2700 5455 29800
POCHAMPAD-II TSPGENCO HYDRO-HYDRO 900 1932 40700
NIZAMSAGAR TSPGENCO HYDRO-HYDRO 1000 1126 53400
RAICHUR TPS 1 to 7 KPCL THERMAL-COAL 147000 890866 43800
RAICHUR TPS 8 KPCL THERMAL-COAL 25000 159523 48200
BELLARI TPS 1 KPCL THERMAL-COAL 50000 318679 51100
BELLARI TPS 2 KPCL THERMAL-COAL 50000 232347 55600
BELLARI TPS 3 KPCL THERMAL-COAL 70000 47565 34400
BHADRA PH KPCL HYDRO-HYDRO 3920 2369 45900
GERUSUPPA PH KPCL HYDRO-HYDRO 24000 26990 22000
GHAT PRABHA HEP KPCL HYDRO-HYDRO 3200 4777 25300
KADRA HPS KPCL HYDRO-HYDRO 15000 16889 26800
NAGJHARI KPCL HYDRO-HYDRO 90000 155159 9800
KODASALLI DPH KPCL HYDRO-HYDRO 12000 14854 19200
MUNIRA+MGH+SPH+SPH KPCL HYDRO-HYDRO 22640 48211 7900
SHARAVATHY HPS KPCL HYDRO-HYDRO 108550 276215 5400
ALMATTI DPH KPCL HYDRO-HYDRO 29000 39611 24600
VARAHI UGPH KPCL HYDRO-HYDRO 46000 71368 15600
IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 17196 15300
IDUKKI HPS KSEB HYDRO-HYDRO 78000 137905 15300
KAKKAD HPS KSEB HYDRO-HYDRO 5000 13063 15300
KALLADA HPS KSEB HYDRO-HYDRO 1500 4436 15300
KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 46544 15300
KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 635 15300
LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 30822 15300
MALANKARA HPS KSEB HYDRO-HYDRO 1050 2474 15300
MATTUPETTY KSEB HYDRO-HYDRO 200 230 15300
MALAMPUZHA KSEB HYDRO-HYDRO 250 063 15300
CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 864 15300
URUMI ST I amp II KSEB HYDRO-HYDRO 615 903 15300
LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 248 15300
NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7765 19625 15300
PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 16601 15300
PANNIAR HPS KSEB HYDRO-HYDRO 3240 6217 15300
PORINGALKUTHU KSEB HYDRO-HYDRO 3600 10052 15300
PORINGALKUTHU LBE KSEB HYDRO-HYDRO 1600 9438 15300
PEPPARA KSEB HYDRO-HYDRO 300 395 15300
POOZHITHODE KSEB HYDRO-HYDRO 480 1045 15300
Page 38
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) PEECHI KSEB HYDRO-HYDRO 125 040 15300
RANI-PERUNADU KSEB HYDRO-HYDRO 400 585 15300
SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 79783 15300
SENGULAM HPS KSEB HYDRO-HYDRO 5120 11558 15300
SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 16711 15300
VILANGAD KSEB HYDRO-HYDRO 750 1578 15300
BARAPOLE KSEB HYDRO-HYDRO 1500 1932 15300
VELLATHOOVAL KSEB HYDRO-HYDRO 360 305 15300
CHIM0NY KSEB HYDRO-HYDRO 250 156 15300
ADYANPARA KSEB HYDRO-HYDRO 350 501 15300
BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 554 15300
KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 3801 15300
KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 23132 32800
ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 14416 62280
METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 523970 62280
METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 321270 62280
NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 336575 62280
NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 591240 62280
TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 508966 62280
KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 30897 62280
VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 18720 90699 62280
KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 33593 62280
BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 1047 62280
PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 1250 62280
PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 330 62280
MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 4897 62280
MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 032 62280
KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15681 62280
KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 40608 62280
KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 21342 62280
KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 4717 62280
KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4322 62280
KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2399 62280
METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 4416 62280
METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 8035 62280
BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2187 62280
BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2359 62280
BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2511 62280
BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 1949 62280
BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 1819 62280
POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 172 62280
SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 241 62280
MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 026 62280
THIRUMOORTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 136 62280
PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 9309 62280
VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 353 62280
SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 4192 62280
PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 6571 62280
SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 1186 62280
SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6319 62280
ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 6122 62280
KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 28674 62280
SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 18381 62280
SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 4258 62280
KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 12680 62280
KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4201 62280
ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 000 62280
PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 19175 62280
AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 078 62280
BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 504 62280
BHAVANI KATTALAI (BKB)(IIIampIII BB I amp II)TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 5847 62280
PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 000 62280
Page 39
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) SRI DAMODARAM STPS APPDCL THERMAL-COAL 160000 808108 36300
PRIVATE SECTOR
KARUPPUR TANJORE LANCO TANJORE PCL THERMAL-GAS 12000 48096 28770
SIMHAPURI ENERGY LTD SIMHAPURI ENERGY LTD THERMAL-COAL 60000 143900 39100
JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 7111 45500
SBU 1 JSW ENERGY LTD
VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 26000 159100
43300
SBU 2 JSW ENERGY LTD
VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 60000 247900
42800
LANCO KPLLANCO KONDAPALLI POWER
LTDTHERMAL-GAS 36814 85060
25776
LANCO KPL STG -IILANCO KONDAPALLI POWER
LTDTHERMAL-GAS 36600 12979
46330
LANCO KPL STG -IIIALANCO KONDAPALLI POWER
LTDTHERMAL-GAS 37100 85710
46330
LANCO KPL STG -III BLANCO KONDAPALLI POWER
LTDTHERMAL-GAS 37100 43639
46330
HINDUJA NATIONAL PCL HINDUJA NATIONAL PCL THERMAL-COAL 104000 303000 38200
MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 121164 49940
UDUPI POWER COR LTD ADANI POWER LTD THERMAL-COAL 120000 754613 42500
SPECTRUM POWER GENERATION
LTD SPECTRUM PG LTD THERMAL-GASN 20525 9256812
34952
TAQA NEYVELI POWER COM PVT
LTD TAQA NEYVELI THERMAL-LIG 25000 5840
34500
ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 251000 51000
ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 207860 36800
GMR VEMAGIRI POWER GENERATION
LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 30117
46450
EASTERN REGION
CENTRAL SECTOR
MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 64675 53113
MTPS STAGE - II KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 39000 1432 69138
BOKARO `B` TPS DVC THERMAL-COAL 63000 145670 31539
MEJIA TPS U 1-3 DVC THERMAL-COAL 63000 348298 31552
MEJIA TPS U 4 DVC THERMAL-COAL 21000 116099 34997
MEJIA TPS U 5-6 DVC THERMAL-COAL 50000 276427 35976
MEJIA TPS U 7-8 DVC THERMAL-COAL 100000 552854 36991
DURGAPUR STEEL TPS DVC THERMAL-COAL 100000 665550 39323
DURGAPUR TPS DVC THERMAL-COAL 21000 59270 35416
RAGHUNATHPUR TPS DVC THERMAL-COAL 120000 201650 35326
MAITHON HYDEL STA DVC HYDRO-HYDRO 6320 12200 17984
CHANDRAPURA TPSU1-3 DVC THERMAL-COAL 42000 257610 35095
CHANDRAPURA TPSU7-8 DVC THERMAL-COAL 50000 306673 34987
KODERMA TPS DVC THERMAL-COAL 100000 380180 38131
PANCHET HPS DVC HYDRO-HYDRO 8000 13360 17984
TILLAYA HPS DVC HYDRO-HYDRO 400 1410 17984
RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34700 35400
TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 277300 23200
TLDP -III NHPC LTD HYDRO-HYDRO 13200 55400 62000
TLDP -IV NHPC LTD HYDRO-HYDRO 16000 60300 25600
FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 957219 33700
FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 308943 41000
BONGAINGAON TPS NTPC LTD THERMAL-COAL 25000 153663 58600
KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 542277 34200
KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 942591 34200
BARH-II NTPC LTD THERMAL-COAL 132000 728021 44500
TALCHER TPS NTPC LTD THERMAL-COAL 46000 335521 30100
TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 702319 25600
TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1436521 24700
STATE SECTOR
BTPS(RampM) BIHAR STATE PGCL THERMAL-COAL 22000 12142 39700
BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 98331 10602
HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 50593 9482
CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 19689 2605
RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 53192 6033
UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 147208 14637
Page 40
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 60353 4519
IB TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 288567 25000
J P H GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 210 038 61100
MEYONG CHU GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 400 1086 61100
TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 122667 38200
DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 214339 43321
KOLAGHAT THERMAL POWER
STATION
WEST BENGAL PDCL THERMAL-COAL 126000 538269 31603
BAKRESHWAR THERMAL POWER
PLANT
WEST BENGAL PDCL THERMAL-COAL 105000 634876 32154
BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 45000 166855 33299
SANTHALDIH THERMAL POWER
STATION
WEST BENGAL PDCL THERMAL-COAL 50000 336442 34932
SAGARDIGHI THERMAL POWER
PROJECT
WEST BENGAL PDCL THERMAL-COAL 160000 423121 34705
JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 20344 68900
RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 24559 68900
TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 4623 68900
PURULIA PUMPED STORAGE
PROJECT
WEST BENGAL SEDCL HYDRO-HYDRO 90000 108816 68900
MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2768 68900
PRIVATE SECTOR
CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 49474 20230
CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 555500 70200
HALDIA ENERGY HALDIA ENERGY LTD THERMAL-COAL 60000 371000 50400
DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3688 63400
KAMALANGA TPS GMR KAMALANGA ENERGY LTD THERMAL-COAL 105000547670
33300
ADHUNIK POWER U-1 ADHUNIK POWER THERMAL-COAL 27000 158 44060
ADHUNIK POWER U-2 ADHUNIK POWER THERMAL-COAL 27000 168 44250
VL-JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 332800 23622
JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 43000 45250
JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 71700 37030
JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 70700 35920
JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 71100 38870
JOJOBERA UNIT 5 TATA POWER COM LTD THERMAL-COAL 12000 79300 44560
JOJOBERA UNIT 6 TATA POWER COM LTD THERMAL-WHR 12000 83700 12840
IEL KALINGANAGAR U-I TATA POWER COM LTD THERMAL-WG 6750 33400 22500
IEL KALINGANAGAR U-II TATA POWER COM LTD THERMAL-WG 6750 34800 22500
MAITHON UNIT 1 amp 2 TATA POWER COM LTD THERMAL-COAL 105000 678000 36100
HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 27500 24340
HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 28400 24340
HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 15800 24310
NORTH EASTERN REGION
CENTRAL SECTOR
LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 74100 36600
AGARTALA GT NEEPCO THERMAL-GAS 13500 88611 27210
ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 153111 32310
DOYANG HEP NEEPCO HYDRO-HYDRO 7500 25598 49801
KOPILI HEP NEEPCO HYDRO-HYDRO 20000 98186 11491
KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 19582 20237
KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 10310 17968
RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 124093 22945
TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 10100 17344 39000
STATE SECTOR
HYDRO POWER (122 Stns) ITANAGAR GOVT OF ARUNACHAL
PRADESHHYDRO-HYDRO 6971 6217270
24600
KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39514 17337
LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 82327 36810
NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 33318 48290
MYNTRIANG SHEP ST II ASSAM POWER GENCO HYDRO-HYDRO 300 567 35776
LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 9130 49200
LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 012 49200
DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 022 49200
TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 000 49200
UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 4990 16000
UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 6476 37000
UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 16494 14600
UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 3600 9556 15000
SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 758 8000
MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44070 44800
KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 154 41400
TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 091 41400
MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 411 41400
MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 394 41400
KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 760 41400
SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 3264 41400
LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 044 41400
BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 18953 28000
ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 43585 28200
GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 4080 11100
Note
LIG Lignite N Naptha WHR Waste Heat Recovery
Page 41
File NoCEA-CH-14-1142018-Coordination Division
आकड़ मममलयन यननट नट Figures in MU net
ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied
कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )
चडीगढ़ Chandigarh 141 141 0 00 947 947 0 00
दिलली Delhi 2925 2924 1 00 20034 20021 13 01
हरियजणज Haryana 4794 4794 0 00 30651 30651 0 00
दहमजचल परिश Himachal Pradesh 876 853 24 27 4940 4773 167 34
रमम कशमीि Jammu amp Kashmir 1520 1246 274 180 9485 7646 1839 194
परजब Punjab 5575 5575 0 00 34414 34401 13 00
िजरसथजन Rajasthan 6202 6201 0 00 38594 38434 160 04
उतति परिश Uttar Pradesh 10211 10124 86 08 65349 64836 513 08
उततिजखड Uttarakhand 1162 1149 13 11 7311 7229 82 11
उततरी कषतर Northern Region 33405 33008 398 12 211725 208939 2786 13
छततीसगढ़ Chhattisgarh 2403 2388 15 06 13665 13638 27 02
गरिजत Gujarat 10122 10122 0 00 59146 59132 14 00
मधय परिश Madhya Pradesh 5492 5491 1 00 32552 32551 1 00
महजिजषटर Maharashtra 13615 13612 3 00 80266 80260 6 00
िमन औि दिउ Daman amp Diu 221 221 0 00 1306 1306 0 00
िजिि व नगि हवली Dadra amp Nagar Haveli 551 551 0 00 3204 3204 0 00
गोवज Goa 339 339 0 00 2131 2128 2 01
पशचिमी कषतर Western Region 32742 32723 19 01 192270 192220 50 00
आनधर परिश Andhra Pradesh 5294 5287 7 01 31518 31480 37 01
तलगजनज Telangana 6279 6272 8 01 31503 31463 40 01
कनजाटक Karnataka 5701 5693 8 01 33269 33225 45 01
किल Kerala 2050 2026 24 12 12140 12063 76 06
तममल नजड Tamil Nadu 8971 8959 12 01 57131 57065 66 01
पडचिी Puducherry 226 224 2 08 1438 1431 7 05
लकष-दवीप Lakshadweep 4 4 0 0 23 23 0 0
दकषकषणी कषतर Southern Region 28520 28460 60 02 166998 166727 271 02
बबहजि Bihar 2839 2793 46 16 16400 16213 188 11
िजमोिि घजटी ननगम DVC 1901 1750 151 79 11384 11130 254 22
झजिखणड Jharkhand 740 723 17 22 4321 4252 69 16
ओडडशज Odisha 2921 2918 3 01 17077 17058 19 01
पशशचम बगजल West Bengal 4902 4879 23 05 28804 28681 123 04
मसशककम Sikkim 39 39 0 01 239 239 0 01
अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 67 173 162 12 67
परवी कषतर Eastern Region 13341 13102 240 18 78225 77573 652 08
अरणजचल परिश Arunachal Pradesh 74 73 1 10 435 429 6 14
असम Assam 950 914 36 38 5320 5094 226 43
मणणपि Manipur 70 69 1 11 414 408 6 15
मघजलय Meghalaya 150 150 0 01 896 896 0 01
ममज़ोिम Mizoram 58 57 1 12 302 297 5 16
नजगजलड Nagaland 80 72 8 104 464 414 50 108
बिपिज Tripura 192 191 1 07 895 878 17 19
उततर-परवी कषतर North-Eastern Region 1575 1527 48 31 8726 8415 311 36
समपणण भारत All India 109584 108819 765 07 657944 653873 4071 06
Energy not Supplied Energy not Supplied
ससतबर2018 September2018 अपरल2018 -ससतबर2018 April2018 to September2018
ऊरजा पनत ा म कमी ऊरजा पनत ा म कमी
Excludes energy exported to Bangladesh
राजयState
ऊराण वरवदयत आपरतण शथिरत ररपोरण (सशोधित) Energy Power Supply Position Report (Revised)
25
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
File NoCEA-CH-14-1142018-Coordination Division
अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met
कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )
चडीगढ़ Chandigarh 293 293 0 00 369 369 0 00
दिलली Delhi 5358 5358 0 00 7016 7016 0 00
हरियजणज Haryana 9008 9008 0 00 10270 10270 0 00
दहमजचल परिश Himachal Pradesh 1466 1466 0 00 1479 1479 0 00
रमम कशमीि Jammu amp Kashmir 2951 2361 590 200 2951 2361 590 200
परजब Punjab 11405 11405 0 00 12638 12638 0 00
िजरसथजन Rajasthan 10612 10612 0 00 11698 11698 0 00
उतति परिश Uttar Pradesh 18346 18121 225 12 20498 20062 436 21
उततिजखड Uttarakhand 1996 1996 0 00 2143 2143 0 00
उततरी कषतर Northern Region 56407 55649 758 13 63166 61726 1440 23
छततीसगढ़ Chhattisgarh 4404 4075 328 75 4404 4136 268 61
गरिजत Gujarat 16963 16963 0 00 17053 16963 90 05
मधय परिश Madhya Pradesh 8811 8771 41 05 8811 8775 36 04
महजिजषटर Maharashtra 22455 22349 106 05 23395 23254 141 06
िमन औि दिउ Daman amp Diu 357 356 1 02 357 356 1 02
िजिि व नगि हवली Dadra amp Nagar Haveli 816 815 1 01 816 815 1 01
गोवज Goa 596 596 0 00 596 596 0 00
पशचिमी कषतर Western Region 52933 52895 38 01 53841 52895 945 18
आनधर परिश Andhra Pradesh 9435 9416 19 02 9435 9416 19 02
तलगजनज Telangana 10815 10815 0 00 10815 10815 0 00
कनजाटक Karnataka 10103 10090 13 01 10690 10688 2 00
किल Kerala 3888 3638 251 64 4050 3997 53 13
तममल नजड Tamil Nadu 14556 14553 3 00 15029 14981 47 03
पडचिी Puducherry 390 372 17 45 420 400 19 46
लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0
दकषकषणी कषतर Southern Region 45542 45428 114 02 45946 45684 262 06
बबहजि Bihar 5050 5045 5 01 5050 5045 5 01
िजमोिि घजटी ननगम DVC 2641 2641 0 00 2874 2874 0 00
झजिखणड Jharkhand 1233 1233 0 00 1339 1284 55 41
ओडडशज Odisha 4906 4906 0 00 5357 5357 0 00
पशशचम बगजल West Bengal 8644 8639 5 01 9130 9123 7 01
मसशककम Sikkim 78 78 0 00 90 90 0 00
अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7
परवी कषतर Eastern Region 22110 22100 10 00 22470 22290 180 08
अरणजचल परिश Arunachal Pradesh 132 130 2 15 138 133 5 37
असम Assam 1865 1809 56 30 1865 1809 56 30
मणणपि Manipur 184 182 2 13 193 186 7 36
मघजलय Meghalaya 317 317 0 00 371 368 2 07
ममज़ोिम Mizoram 95 93 2 23 103 98 4 41
नजगजलड Nagaland 142 138 5 32 156 138 18 117
बिपिज Tripura 296 293 3 10 298 293 5 17
उततर-परवी कषतर North-Eastern Region 2921 2850 71 24 2967 2850 117 39
समपणण भारत All India 177022 175528 1494 08 177022 175528 1494 08
26
मजग की पनता म कमी मजग की पनता म कमी Demand not MetDemand not Met
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
Excludes the supply to Bangladesh
अधिकतम वरवदयत आपरतण शथिरत ररपोरण (सशोधित) Peak Power Supply Position Report (Revised)
आकड़ मगज वजट नट Figures in MW net
राजयStateससतबर2018 September2018 अपरल2018 -ससतबर2018 April2018 to September2018
File NoCEA-CH-14-1142018-Coordination Division
अकरबर2018 October2018अपरल2018 -अकरबर2018 April2018 to October2018
उततरी कषतर Northern Region
चडीगढ़ Chandigarh Data not received Data not received
दिलली Delhi
हरियजणज Haryana
दहमजचल परिश Himachal Pradesh
रमम कशमीि Jammu amp Kashmir Data not received Data not received
परजब Punjab
िजरसथजन Rajasthanउतति परिश Uttar Pradesh
उततिजखड Uttarakhand
पशचिमी कषतर Western Region
छततीसगढ़ Chhattisgarh
गरिजत Gujarat
मधय परिश Madhya Pradesh
महजिजषटर Maharashtra
गोवज Goa
दकषकषणी कषतर Southern Region
आनधर परिश Andhra Pradesh
तलगजनज Telangana
कनजाटक Karnataka
किल Kerala
तममल नजड Tamil Nadu
पडचिी Puducherryपरवी कषतर Eastern Region
बबहजि Bihar
झजिखणड Jharkhand
ओडडशज Odisha
पशशचम बगजल West Bengal
N
o No
tified
Cuts
N
o No
tified
Cuts
27
अकरबर 2018 म इडथरीर पर वरवदयत करौती का वरवरवरण Notified Power CutsRestrictions on Industries during October2018
राजय कषतर State Regionऊराणमाग करौती EnergyDemand Cut
No Notified Cuts No Notified Cuts
File NoCEA-CH-14-1142018-Coordination Division
अकरबर2018 October2018अपरल2018 -अकरबर2018 April2018 to October2018
उततरी कषतर Northern Region
चडीगढ़ Chandigarh Data not received Data not received
दिलली Delhi Data not received Data not received
हरियजणज Haryana 940 hrsday 0709 - 0950 hrsday
दहमजचल परिश Himachal Pradesh No cut imposed on agriculture consumers and uninterrupted
power is being supplied to agriculture sector
HPSEBL has only 2 agriculture consumers and uninterrupted
power is being supplied to agriculture sector
रमम कशमीि Jammu amp Kashmir Data not received Data not received
परजब Punjab 0507 hrsday 0349 - 0844 hrsday
िजरसथजन Rajasthan 0630 hrsday 0630 hrsday
उतति परिश Uttar Pradesh 1825 hrsday 1814 - 1858 hrsday
उततिजखड Uttarakhand 2350 hrsday 2128 - 2357 hrsday
पशचिमी कषतर Western Region
छततीसगढ़ Chhattisgarh 18hoursday 18 hrsday
गरिजत Gujarat 805 hrsday 805 hrsday
मधय परिश Madhya Pradesh Three-Phase Supply(Irrigation)-947 hrs day
Three-Phase (Mixed) Supply - 2311 hrs day
Three-Phase Supply(Irrigation)- 0933 - 0947 hrs day Three-
Phase (Mixed) Supply - 2300 - 2320 hrs day
महजिजषटर Maharashtra Three-Phase Supply(Irrigation)- 9 hrs day
Three-Phase (Mixed) Supply - 24 hrs day
Three-Phase Supply(Irrigation)- 9 hrs day
Three-Phase (Mixed) Supply - 24 hrs day
गोवज Goa No restriction No restriction
दकषकषणी कषतर Southern Region
आनधर परिश Andhra Pradesh 07 hrsday 07 hrsday
तलगजनज Telangana 24 hoursday 24 hoursday
कनजाटक Karnataka 6 hrsday 6 hrsday
किल Kerala No Restrictions No Restrictions
तममल नजड Tamil Nadu 9 hrsday (6 hrs during day time and 3 hrs during night time) 9 hrsday (6 hrs during day time and 3 hrs during night time)
पडचिी Puducherry No Restrictions No Restrictions
परवी कषतर Eastern Region
बबहजि Bihar About 18 hrsday About 18 hrsday
झजिखणड Jharkhand About 20 hrsday About 20 hrsday
ओडडशज Odisha 24 hrsday 24 hrsday
पशशचम बगजल West Bengal About 23 hrsday About 23 hrsday
28
अकटबर 2018 कषि कषतर को षिदयत आपरति का षििरण Power Supply to Agricultural Sector during October2018
राजय कषतर State Regionऔसत वरवदयत आपरतण घनरो म Average Hours of Supply
On segregated feeders
File NoCEA-CH-14-1142018-Coordination Division
SNo Contents Page
1 Growth of Installed Capacity since 6th Plan 29
2 Progress of Transmission Sector since 6th Plan 30
3 All India Yearly Coal consumption for Power Generation (Utilities)
4 All India Annual Per Capita Consumption of Electricity since -2006
5 Average cost of power supply amp Average realisation (Paisakwh)
6 Growth of Rural Electrification amp Pump Sets Energisation
7 Status of Hydro Schemes Cleared by the CEA in Oct-2018
Section G - Growth of Power Sector
31
32
File NoCEA-CH-14-1142018-Coordination Division
(In MW)
Coal Gas Diesel Total
End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472
End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634
End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537
End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596
End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921
End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703
End of 12th Plan 19216288 2532938 83763 21832988 6780 4447842 50018 31960630
Up to Oct-2018 19599250 2493722 837629 22176734 6780 4548742 7201281 34604757
Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-17) = 51529 MW
Electricity Generation (MU) Targets and Achievements for 2016-17
Coal Gas Diesel Nuclear Hydro Res Total
1959925 2493722 837629 678000 454874 72012805 22925174
29
1 Growth of Installed Capacity Since 6th Plan
Plan YearThermal
Nuclear Hydro RES (MNRE) Total
Total Installed Capacity 34604757 MW
Coal Gas Diesel Nuclear Hydro Res
File NoCEA-CH-14-1142018-Coordination Division
Progress of Transmission Sector in the Country up to Oct 2018
1 TRANSMISSION LINES (All fig in CKM)
At the end of
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
6th plan 0 0 0 0 0 0 0 0 0 0 0 0 1831 4198 0 6029 1641 44364 0 46005 3472 48562 0 52034
7th plan 0 0 0 0 0 0 0 0 0 0 0 0 13068 6756 0 19824 4560 55071 0 59631 17628 61827 0 79455
8th plan 0 0 0 0 1634 0 0 1634 0 0 0 0 23001 13141 0 36142 6564 73036 0 79600 31199 86177 0 117376
9th plan 0 0 0 0 3234 1504 0 4738 751 409 0 1160 29345 20033 0 49378 8687 88306 0 96993 42017 110252 0 152269
10th plan 0 0 0 0 4368 1504 0 5872 1775 409 0 2184 48708 24730 0 73438 9444 105185 0 114629 64295 131828 0 196123
11th Plan 0 0 0 0 5948 1504 1980 9432 4839 411 0 5250 71023 30191 5605 106819 10140 125010 830 135980 91950 157116 8415 257481
12th Plan 6124 0 0 6124 5948 1504 1980 9432 25465 1177 4598 31240 92482 48240 17065 157787 11014 151276 978 163268 141033 202197 24621 367851
13th Plan (Up
to Mar2018)6124 0 0 6124 5948 1504 1980 9432 28666 1512 4881 35059 98247 54286 19067 171600 11258 156497 1000 168755 150243 213799 26928 390970
13th Plan (Up
to Sep-18)6124 0 0 6124 5948 1504 1980 9432 30952 1512 5059 37523 99683 56069 20662 176414 11318 160958 1000 173276 154025 220043 28701 402769
27150
75050
47900
118050
90650
30
IR addition in 12th Plan (up to
March 2017)
Total IR (up to Oct-18)
IR at the end of 11th Plan
IR at the end of 12th Plan
Envisaged IR Capacity at the end
of 13th Plan
Grand Total
Note - The figure upto the end of 10th plan in for stringing progress including the lines not commissioned Now only commissioned lines are reckoned Accordingly the figure for 10th plan (end) may read as 187555 after adjusting with (-) 10852 Ckm
Inter-regional Power Transfer Capacity
plusmn 800 kV HVDC plusmn 500 kV HVDC 765 kV 400 kV 220 kV
File NoCEA-CH-14-1142018-Coordination Division
2004-05 27800
2005-06 28100
2006-07 30200
2007-08 33000
2008-09 35500
2009-10 36700
2010-11 38700
2011-12 41756
2012-13 45460
2013-14 48940
2014-15 53040
2015-16 54590
2016-17 57430
2017-18 60800
Year
2005-06
2006-07
2007-08
2008-09
2009-10
2010-11
2011-12
2012-13
2013-14
2014-15
2015-16
2016-17
2017-18
2004-05 254 209 7568
2005-06 260 221 7636
2006-07 276 227 7423
2007-08 293 239 7727
2008-09 340 263 8713
2009-10 355 268 8870
2010-11 398 303 11975
2011-12 455 330 13514
2012-13 501 376 14867
2013-14 518 175
2014-15 520
6719
7171
3 All India yearly Coal Consumption for Power Generation (Utilities)
YEARCoal Consumption
Million Tonnes
4 All India Annual per Capita consumption of Electricity Since 2006
Per Capita Consumption ( kWh)
6314
(GrossGen+ Net Import) Mid-year population
5 Average cost of power supply amp average realization ( paiseKWH )
Yearcost of supply
(paiseunit)
Realization(paiseunit)
Including AgricultureOnly
Agriculture
1149
7335
7786
91441
8188
88363
957
1010
1075
1122
File NoCEA-CH-14-1142018-Coordination Division
Source- PFC Reports on the performance of State Power Utilities 31
File NoCEA-CH-14-1142018-Coordination Division
Sl
NoExecuting Agency
Installed
Capacity (MW)Cost (Rs crore)
Date of
Clearance
32
No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification
since 2004-05
65291374575 296361511th Plan
Cumu upto End of 11th Plan
596556 21212860
557439Cummulative up to end of 12th Plan
46708
18423975
499150
2003-042004-05
5743
9769
Cumu upto End of 10th Plan
010407 to 310308
010410 to 310311557976840909
010411 to 310312
412667
86293726
3207
482864
12632
1576036
4451722594
15455554
2314176
397343611750
2093311060316074
65109527813884
6 Growth Of Rural Electrification amp Pumpsets Energisation
Plan Year
9th Plan2002-03
134092626
4111
Pump Sets Energised Villages Electricfied (Nos)
2001-02
284064367244
1218
27801997-981998-991999-002000-01
297594
010408 to 310309010409 to 310310
10th Plan
2005-062006-07
322968331020
Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as
Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received
from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made
available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified
villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is
independent of the earlier published reports
No Hydro Electric Project has been issued concurrenceAppraisal letter by CEA during October 2018
7 Status of Hydro Schemes Cleared by the CEA in Oct-2018
Name of Scheme
File NoCEA-CH-14-1142018-Coordination Division
SN Contents Page
1 Rate of sale of power for the year 2016-17 33-41
RATE OF SALE OF POWER FOR THE YEAR 2016-17
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) NORTHERN REGION
CENTRAL SECTOR
BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 18000 66900 19800
CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 54000 222400 21600
CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 30000 144400 19600
CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 23100 91700 42600
PARBATI - III HPS NHPC LTD HYDRO-HYDRO 52000 68200 54800
DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 28000 95600 30000
CHUTAK NHPC LTD HYDRO-HYDRO 4400 22000 79800
DULHASTI HPS NHPC LTD HYDRO-HYDRO 39000 228000 56400
SALAL HPS NHPC LTD HYDRO-HYDRO 69000 342300 11000
TANAKPUR HPS NHPC LTD HYDRO-HYDRO 9420 43000 29600
URI HPS -I NHPC LTD HYDRO-HYDRO 48000 280300 16000
URI HPS - II NHPC LTD HYDRO-HYDRO 24000 147300 48600
NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 4500 24600 88200
SEWA - II NHPC LTD HYDRO-HYDRO 12000 47100 43400
ANTA CCPP NTPC LTD THERMAL-GASN 41930 67539 32400
AURAIYA CCPP NTPC LTD THERMAL-GASN 66336 53501 39100
BADARPUR TPS NTPC LTD THERMAL-COAL 70500 159153 44800
DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 84000 296170 42300
DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 98000 526686 46300
DADRI CCPP NTPC LTD THERMAL-GASHSD 82978 227469 33000
FARIDABAD CCPP NTPC LTD THERMAL-GASN 43159 115577 30800
RIHAND STPS I NTPC LTD THERMAL-COAL 100000 596766 24500
RIHAND STPS II NTPC LTD THERMAL-COAL 100000 737069 24600
RIHAND STPS III NTPC LTD THERMAL-COAL 100000 706546 30600
SINGRAULI STPS NTPC LTD THERMAL-COAL 200000 1394068 20400
TANDA TPS NTPC LTD THERMAL-COAL 44000 295438 40800
UNCHAHAR TPS I NTPC LTD THERMAL-COAL 42000 256454 39800
UNCHAHAR TPS II NTPC LTD THERMAL-COAL 42000 273577 38900
UNCHAHAR TPS III NTPC LTD THERMAL-COAL 21000 142780 43000
KOLDAM NTPC LTD HYDRO-HYDRO 80000 363260 43600
NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 303575 25841
RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 108000 668677 35374
NJHPS SJVNL HYDRO-HYDRO 150000 699496 23820
RAMPUR HPS SJVNL HYDRO-HYDRO 41202 195982 32260
TEHRI HPP THDC HYDRO-HYDRO 100000 272543 51800
KOTESHWAR HEP THDC HYDRO-HYDRO 40000 106244 53400
IGSTPS JHAJJAR ARAVALI P CPL THERMAL-COAL 150000 510429 49490
NEYVELI BARSINGSAR NEYVELI LIG CORP LTD THERMAL-LIG 25000 127520 38040
STATE SECTOR
PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 21000 14222 48200
PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 21000 19205 48400
PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 25000 102257 42600
PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 25000 62107 41800
DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 60000 312213 41000
RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 120000 35767442200
WYC HYDEL STATION HPGCL HYDRO-HYDRO 6240 20365 24900
GIRI POWER HOUSE HPSEB HYDRO-HYDRO 6000 13958 7600
ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 1695 5467 11900
BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 12000 18528 6700
GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 2250 7462 22500
BASSI POWER HOUSE HPSEB HYDRO-HYDRO 6600 29649 7500
BINWA POWER HOUSE HPSEB HYDRO-HYDRO 600 2749 19300
ANNEXURE-I
RATE OF SALE OF POWER FOR THE YEAR 2016-2017
Page 33
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) GAJ POWER HOUSE HPSEB HYDRO-HYDRO 1050 2914 26700
BANER POWER HOUSE HPSEB HYDRO-HYDRO 1200 2864 16200
HOLI POWER HOUSE HPSEB HYDRO-HYDRO 300 616 22500
THIROT POWER HOUSE HPSEB HYDRO-HYDRO 450 1126 22500
KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 1200 3064 22500
LARJI POWER HOUSE HPSEB HYDRO-HYDRO 12600 53677 23700
NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 250 750 31000
CHABA POWER HOUSE HPSEB HYDRO-HYDRO 175 465 23300
RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 150 101 13400
SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 200 000 22500
KILLAR HPSEB HYDRO-HYDRO 030 050 22500
BHABA AUGUMENP H HPSEB HYDRO-HYDRO 450 1276 22500
BS CHAMBA HPSEB HYDRO-HYDRO 045 099 19500
GUMMA HPSEB HYDRO-HYDRO 300 423 22500
GAS TURBINE POWER STATION IPGCL THERMAL-GAS 27000 67233 39300
PPS-I PPCL THERMAL-GAS 33000 175905 38300
PPS-III PPCL THERMAL-GAS 137120 196879 36100
LOWER JHELUM JampKPDD HYDRO-HYDRO 10500 60214 5100
UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 2260 10514 6300
UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 10500 44202 8500
GANDHARBAL JampKPDD HYDRO-HYDRO 1500 8925 4700
KARNAH MPH JampKPDD HYDRO-HYDRO 200 1122 31000
CHENANI I JampKPDD HYDRO-HYDRO 2330 10892 6600
CHENANI II JampKPDD HYDRO-HYDRO 200 1188 9300
CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 750 3634 14200
IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 375 2108 18500
IGO MERCHELLONG JampKPDD HYDRO-HYDRO 300 1572 29700
PAHALGAM MHP JampKPDD HYDRO-HYDRO 450 1713 32900
MARPACHOO JampKPDD HYDRO-HYDRO 075 375 29800
HAFTAL JampKPDD HYDRO-HYDRO 100 483 28700
SANJAK JampKPDD HYDRO-HYDRO 126 441 36000
SEWA-III JampKPDD HYDRO-HYDRO 900 3273 20200
BHADERWAH JampKPDD HYDRO-HYDRO 150 935 8900
BAZGO JampKPDD HYDRO-HYDRO 030 108 33300
SUMOOR JampKPDD HYDRO-HYDRO 010 045 35400
HUNDER JampKPDD HYDRO-HYDRO 040 176 26200
STAKNA JampKPDD HYDRO-HYDRO 400 1933 4100
KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 124000 662879 31360
SURATGARH TPS RRVUNL THERMAL-COAL 150000 402328 41730
CHHABRA TPS 1amp 2 RRVUNL THERMAL-COAL 50000 305946 36700
CHHABRA TPS 3 RRVUNL THERMAL-COAL 25000 151536 36700
CHHABRA TPS 4 RRVUNL THERMAL-COAL 25000 155896 36700
RAMGARH GT POWER PROJECT RRVUNL THERMAL-COAL 22050 43177 41800
RAMGARH GAS T P PROJECT 3 RRVUNL THERMAL-GAS 5000 93615 41800
DHOLPUR C C POWER PROJECT RRVUNL THERMAL-R-LNG 33000 9486 46110
MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 14000 20855 34192
MINI MICRO HYDEL (MMH) P S RRVUNL HYDRO-HYDRO 2385 851 37800
KALISINDH TPP 1 RRVUNL THERMAL-COAL 60000 341543 45000
KALISINDH TPP 2 RRVUNL THERMAL-COAL 60000 211588 45000
KHARA HEP UPJVNL HYDRO-HYDRO 7200 26654 7200
MATATILLA HEP UPJVNL HYDRO-HYDRO 3060 12219 6500
OBRA HEP UPJVNL HYDRO-HYDRO 9900 21517 6300
RIHAND UPJVNL HYDRO-HYDRO 30000 57369 5500
ANPARA A TPS UPRVUNL THERMAL-COAL 63000 317536 27000
ANPARA B TPS UPRVUNL THERMAL-COAL 100000 705605 22700
ANPARA D UPRVUNL THERMAL-COAL 100000 300158 39800
HARDUAGANJ TPS UPRVUNL THERMAL-COAL 16500 45817 49200
HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 50000 304389 46600
OBRA A TPS UPRVUNL THERMAL-COAL 28800 13158 34000
OBRA B TPS UPRVUNL THERMAL-COAL 100000 328124 21900
Page 34
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) PANKI TPS UPRVUNL THERMAL-COAL 21000 66488 50300
PARICHHA TPS UPRVUNL THERMAL-COAL 22000 38762 49400
PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 42000 231931 45600
PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 50000 276722 50400
CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 24000 70845 8290
CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 14400 75366 8390
DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 3375 9595 12080
DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 5100 18701 10520
KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4140 17359 12330
KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 12000 33001 9420
KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 3000 11953 8320
TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 9000 33983 12460
MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 30400 124510 16110
RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 19800 17897 10550
MPUR UTTARAKHAND JVNL HYDRO-HYDRO 930 5121 19200
PATHRI UTTARAKHAND JVNL HYDRO-HYDRO 2040 11636 14200
GALOGI UTTARAKHAND JVNL HYDRO-HYDRO 300 648 12500
PRIVATE SECTOR
MGTPP CLP INDIA PVT LTD THERMAL-COAL 132000 268902 41940
SHRINAGAR HEP ALAKNANDA HPCL HYDRO-HYDRO 33000 127414 48800
GAMA INFRAPROP CCPP GAMA INFRAPROP PVT THERMAL-GAS 22500 52686 47000
PPGCL (BARA) JP POWER VENTURES LTD THERMAL-COAL 198000 448200 38500
MALANA HEP MALANA PCL HYDRO-HYDRO 8600 26354 29792
MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 10000 30369 32580
ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 19200 56347 36079
KASHANG HEP H P PCL HYDRO-HYDRO 19500 5034 29200
BASPA-II HEP HBPCL HYDRO-HYDRO 30000 132769 13600
KARCHAM WANGTOO HEP HBPCL HYDRO-HYDRO 100000 434386 36600
RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 108000 582600 43700
RITHALA COMBI CY POWER PLANT TATA POWER DDL THERMAL-GAS 9480 000 11900
RAJPURA TPS NABHA POWER LTD THERMAL-GAS 140000 901484 39000
TALWANDI SABO POWER LTD TALWANDI SABO POWER LTD THERMAL-COAL 198000 636040 49548
ROJA THERMAL POWER STATION ROJA POWER SCL THERMAL-COAL 120000 727200 43400
KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 34400 63400
BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 36000 62600
MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 38200 60800
UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 37900 61500
KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 42300 58800
LALITPUR PGCL BAJAJ ENERGY PVT LTD THERMAL-COAL 198000 359400 47300
PRAYAGRAJ PGCL PRAYAGRAJ PGCL THERMAL-COAL 132000 448200 38595
KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 132000 783182 33438
WESTERN REGION
CENTRAL SECTOR
INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 100000 325333 23892
OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 52000 141663 34001
GANDHAR CCPP NTPC LTD THERMAL-GAS 65739 221924 28700
KAWAS CCPP NTPC LTD THERMAL-GASN 65620 167929 27000
KORBA I amp II NTPC LTD THERMAL-COAL 210000 1499171 20500
KORBA III NTPC LTD THERMAL-COAL 50000 358746 26600
SIPAT STPS I NTPC LTD THERMAL-COAL 198000 1479902 26800
SIPAT STPS II NTPC LTD THERMAL-COAL 100000 766549 26500
VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 126000 693142 25800
VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 100000 608781 23800
VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 100000 673475 27600
VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 100000 655924 32900
VINDHYACHAL STPS V NTPC LTD THERMAL-COAL 50000 328265 31700
MOUDA I NTPC LTD THERMAL-COAL 100000 343130 44500
MOUDA Ii NTPC LTD THERMAL-COAL 66000 40637 39900
RATNAGIRI GAS amp POWER PVT LTD RGPPL THERMAL-GAS 196708 442485 47000
KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 000 24729
TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 32000 201227 10740
Page 35
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 365122 19069
TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 787444 29324
STATE SECTOR
GSEG-HAZIRA15610 MW GUJARAT S ENEGEN LTD THERMAL-GAS 15610 1805 28200
GSEG-HAZIRA35143 MW GUJARAT S ENEGEN LTD THERMAL-GAS 35130 22276 51300
GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 21978 51800
AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 13929 26100
KORBA TPS EAST CSPGCL THERMAL-COAL 44000 198673 33880
DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 365808 27570
KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 316500 30420
HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 532878 19410
CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 515 58300
MTTPS CHAMPA U-I CSPGCL THERMAL-COAL 50000 220376 39000
MTTPS CHAMPA U-II CSPGCL THERMAL-COAL 50000 23709 10000
SHP GANGREL CSPGCL HYDRO-HYDRO 1000 2350 36790
BANGO HEP CSPGCL HYDRO-HYDRO 12000 14662 8900
MHP KORBA WEST CSPGCL HYDRO-HYDRO 170 859 38190
SIKASAR HEP CSPGCL HYDRO-HYDRO 700 418 26870
DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8843 74500
DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 19446 51500
GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 66388 71600
GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127488 41300
KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 96072 43900
KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 29841 56400
SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 184966 58800
UKAI 1-5 GSECL THERMAL-COAL 85000 204891 46900
UKAI TPS 6 GSECL THERMAL-COAL 50000 284448 48200
WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 271999 58300
WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 82808 44100
KADANA HPS GSECL HYDRO-HYDRO 24200 34433 16800
UKAI HPS GSECL HYDRO-HYDRO 30500 40585 6100
TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 123000 11500
BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 8900 10900
BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 7200 27500
JHINNA HPS MPPGCL HYDRO-HYDRO 2000 9700 18500
RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 44300 3400
GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 17300 4600
SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 4100 16900
MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 14600 27000
PENCH HPS MPPGCL HYDRO-HYDRO 16000 23700 8100
RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 3000 16900
AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 134400 35100
SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 283800 38700
SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 344600 34300
SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 111600 61600
SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 211800 58000
SSTPS PH-I MPPGCL THERMAL-COAL 120000 233100 84300
BHUSAWAL TPS MSPGCL THERMAL-COAL 142000 566258 51100
CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1365682 33700
KHAPERKHEDA MSPGCL THERMAL-COAL 134000 706207 39100
KORADI TPS MSPGCL THERMAL-COAL 62000 443206 42000
NASIK TPS MSPGCL THERMAL-COAL 63000 297275 47000
PARLI TPS MSPGCL THERMAL-COAL 113000 175934 71600
PARAS MSPGCL THERMAL-COAL 50000 267931 38700
URAN CCPP MSPGCL THERMAL-GAS 67200 320330 30600
KOYANA MSPGCL HYDRO-HYDRO 195600 328155 13100
SMALL HYDRO POWER PLANTS MSPGCL HYDRO-HYDRO 45400 93062 30500
BHIRA MSPGCL HYDRO-HYDRO 8000 10046 8400
TILLARI MSPGCL HYDRO-HYDRO 8900 10584 3100
SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 233298 20500
SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 87633 20500
PRIVATE SECTOR
Page 36
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 81282 46750
JNSTPP(JAYPEE NIGRIE) JP POWER VENTURES LTD THERMAL-COAL 132000 726695 29310
MB POWER MB POWER THERMAL-COAL 120000 345632 38310
ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 754922 28671
ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 780761 23495
ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 198000 1263784 32090
ADANI POWER MAHARA ADANI POWER LTD THERMAL-COAL 330000 1666191 34124
AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 170065 36827
SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 252035 45129
ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 458551 36000
ESSAR POWER MP LTD ESSAR POWER MP LTD THERMAL-COAL 60000 243040 28600
VEDANTA LTD (P P -I) VEDANTA LTD THERMAL-GAS 3000 15044 24000
VEDANTA LTD (P P -II) VEDANTA LTD THERMAL-GAS 3000 21293 24000
PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 8234600 24000
165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 5850 64390
145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 68717 40349
SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 132655 28776
SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 144686 38567
MUNDRA UMPPCOASTAL GUJARAT POWER
LTD THERMAL-IMP COAL 400000 2530300
23900
LANCO AMARKANTAK TPP PATHADIH
U-ILANCO AMARKAN POWER LTD THERMAL-COAL 30000 195500
29200
LANCO AMARKANTAK TPP PATHADIH
U-IILANCO AMARKAN POWER LTD THERMAL-COAL 30000 206900
27600
BARADARHA TPS D B POWER LTD THERMAL-COAL 120000 677373 29200
JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 405000 28900
JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 453000 40500
DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 339437 40700
TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 293400 44000
TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 137200 37000
TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 174900 44000
BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 92900 14100
BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23700 34300
KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 27600 48300
CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2530300 23900
BHANDARDRA HEP -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 2475 54900
SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 161400 26500
SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 445000 39000
SOTHERN REGION
CENTRAL SECTOR
NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 325699 54820
NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 305532 39880
NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 998805 38510
NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 113016 54070
NEYVELI TAMILNADU POWER LTD JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 625274 42200
VALLUR TPS NTPC TECL THERMAL-COAL 150000 856438 42350
R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 1493 84300
RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1502919 29400
RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 341291 31800
SIMHADRI I NTPC LTD THERMAL-COAL 100000 688382 36800
SIMHADRI II NTPC LTD THERMAL-COAL 100000 663657 43400
KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 593110 31324
MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 291625 21764
KKNPP-1 amp 2 NPCIL NUCLEAR-NUCLEAR 200000 572609 40948
MINICOY LAKSHADEEP THERMAL-DIESEL 340 770 29600
KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1097 29600
AMINI LAKSHADEEP THERMAL-DIESEL 265 509 29600
ANDROTT LAKSHADEEP THERMAL-DIESEL 219 524 29600
KALPENI LAKSHADEEP THERMAL-DIESEL 175 356 29600
AGATTI LAKSHADEEP THERMAL-DIESEL 195 658 29600
KADMAT LAKSHADEEP THERMAL-DIESEL 190 414 29600
KILTAN LAKSHADEEP THERMAL-DIESEL 150 269 29600
CHETLET LAKSHADEEP THERMAL-DIESEL 100 139 29600
BITRA LAKSHADEEP THERMAL-DIESEL 043 024 29600
BANGARAM LAKSHADEEP THERMAL-DIESEL 018 009 29600
Page 37
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) STATE SECTOR
Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 721811 46500
Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 50000 336142 46500
RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 237358 46500
RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 239926 46500
RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 124500 46500
SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 62109 46500
UPPER SILERU APGENCO HYDRO-HYDRO 24000 33000 46500
LOWER SILERU APGENCO HYDRO-HYDRO 46000 81066 46500
DONKARAI APGENCO HYDRO-HYDRO 2500 6007 46500
PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 1262 46500
CHETTIPETA APGENCO HYDRO-HYDRO 100 214 46500
MUCHKUND APGENCO HYDRO-HYDRO 12000 37571 46500
NAGARJUNASAGAR RCPH APGENCO HYDRO-HYDRO 9000 606 46500
TUNGABHADRA HES amp HAMPI(AP
Share)
APGENCO HYDRO-HYDRO 7200 6100 46500
KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 352232 42600
KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 288131 32500
KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 319272 46500
RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 40073 44300
KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 308317 46000
KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 308963 51300
SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 61004 76600
NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 17960 75300
PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 20873 58300
POCHAMPAD-I TSPGENCO HYDRO-HYDRO 2700 5455 29800
POCHAMPAD-II TSPGENCO HYDRO-HYDRO 900 1932 40700
NIZAMSAGAR TSPGENCO HYDRO-HYDRO 1000 1126 53400
RAICHUR TPS 1 to 7 KPCL THERMAL-COAL 147000 890866 43800
RAICHUR TPS 8 KPCL THERMAL-COAL 25000 159523 48200
BELLARI TPS 1 KPCL THERMAL-COAL 50000 318679 51100
BELLARI TPS 2 KPCL THERMAL-COAL 50000 232347 55600
BELLARI TPS 3 KPCL THERMAL-COAL 70000 47565 34400
BHADRA PH KPCL HYDRO-HYDRO 3920 2369 45900
GERUSUPPA PH KPCL HYDRO-HYDRO 24000 26990 22000
GHAT PRABHA HEP KPCL HYDRO-HYDRO 3200 4777 25300
KADRA HPS KPCL HYDRO-HYDRO 15000 16889 26800
NAGJHARI KPCL HYDRO-HYDRO 90000 155159 9800
KODASALLI DPH KPCL HYDRO-HYDRO 12000 14854 19200
MUNIRA+MGH+SPH+SPH KPCL HYDRO-HYDRO 22640 48211 7900
SHARAVATHY HPS KPCL HYDRO-HYDRO 108550 276215 5400
ALMATTI DPH KPCL HYDRO-HYDRO 29000 39611 24600
VARAHI UGPH KPCL HYDRO-HYDRO 46000 71368 15600
IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 17196 15300
IDUKKI HPS KSEB HYDRO-HYDRO 78000 137905 15300
KAKKAD HPS KSEB HYDRO-HYDRO 5000 13063 15300
KALLADA HPS KSEB HYDRO-HYDRO 1500 4436 15300
KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 46544 15300
KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 635 15300
LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 30822 15300
MALANKARA HPS KSEB HYDRO-HYDRO 1050 2474 15300
MATTUPETTY KSEB HYDRO-HYDRO 200 230 15300
MALAMPUZHA KSEB HYDRO-HYDRO 250 063 15300
CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 864 15300
URUMI ST I amp II KSEB HYDRO-HYDRO 615 903 15300
LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 248 15300
NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7765 19625 15300
PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 16601 15300
PANNIAR HPS KSEB HYDRO-HYDRO 3240 6217 15300
PORINGALKUTHU KSEB HYDRO-HYDRO 3600 10052 15300
PORINGALKUTHU LBE KSEB HYDRO-HYDRO 1600 9438 15300
PEPPARA KSEB HYDRO-HYDRO 300 395 15300
POOZHITHODE KSEB HYDRO-HYDRO 480 1045 15300
Page 38
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) PEECHI KSEB HYDRO-HYDRO 125 040 15300
RANI-PERUNADU KSEB HYDRO-HYDRO 400 585 15300
SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 79783 15300
SENGULAM HPS KSEB HYDRO-HYDRO 5120 11558 15300
SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 16711 15300
VILANGAD KSEB HYDRO-HYDRO 750 1578 15300
BARAPOLE KSEB HYDRO-HYDRO 1500 1932 15300
VELLATHOOVAL KSEB HYDRO-HYDRO 360 305 15300
CHIM0NY KSEB HYDRO-HYDRO 250 156 15300
ADYANPARA KSEB HYDRO-HYDRO 350 501 15300
BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 554 15300
KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 3801 15300
KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 23132 32800
ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 14416 62280
METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 523970 62280
METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 321270 62280
NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 336575 62280
NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 591240 62280
TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 508966 62280
KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 30897 62280
VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 18720 90699 62280
KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 33593 62280
BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 1047 62280
PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 1250 62280
PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 330 62280
MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 4897 62280
MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 032 62280
KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15681 62280
KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 40608 62280
KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 21342 62280
KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 4717 62280
KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4322 62280
KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2399 62280
METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 4416 62280
METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 8035 62280
BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2187 62280
BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2359 62280
BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2511 62280
BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 1949 62280
BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 1819 62280
POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 172 62280
SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 241 62280
MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 026 62280
THIRUMOORTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 136 62280
PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 9309 62280
VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 353 62280
SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 4192 62280
PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 6571 62280
SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 1186 62280
SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6319 62280
ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 6122 62280
KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 28674 62280
SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 18381 62280
SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 4258 62280
KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 12680 62280
KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4201 62280
ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 000 62280
PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 19175 62280
AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 078 62280
BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 504 62280
BHAVANI KATTALAI (BKB)(IIIampIII BB I amp II)TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 5847 62280
PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 000 62280
Page 39
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) SRI DAMODARAM STPS APPDCL THERMAL-COAL 160000 808108 36300
PRIVATE SECTOR
KARUPPUR TANJORE LANCO TANJORE PCL THERMAL-GAS 12000 48096 28770
SIMHAPURI ENERGY LTD SIMHAPURI ENERGY LTD THERMAL-COAL 60000 143900 39100
JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 7111 45500
SBU 1 JSW ENERGY LTD
VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 26000 159100
43300
SBU 2 JSW ENERGY LTD
VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 60000 247900
42800
LANCO KPLLANCO KONDAPALLI POWER
LTDTHERMAL-GAS 36814 85060
25776
LANCO KPL STG -IILANCO KONDAPALLI POWER
LTDTHERMAL-GAS 36600 12979
46330
LANCO KPL STG -IIIALANCO KONDAPALLI POWER
LTDTHERMAL-GAS 37100 85710
46330
LANCO KPL STG -III BLANCO KONDAPALLI POWER
LTDTHERMAL-GAS 37100 43639
46330
HINDUJA NATIONAL PCL HINDUJA NATIONAL PCL THERMAL-COAL 104000 303000 38200
MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 121164 49940
UDUPI POWER COR LTD ADANI POWER LTD THERMAL-COAL 120000 754613 42500
SPECTRUM POWER GENERATION
LTD SPECTRUM PG LTD THERMAL-GASN 20525 9256812
34952
TAQA NEYVELI POWER COM PVT
LTD TAQA NEYVELI THERMAL-LIG 25000 5840
34500
ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 251000 51000
ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 207860 36800
GMR VEMAGIRI POWER GENERATION
LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 30117
46450
EASTERN REGION
CENTRAL SECTOR
MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 64675 53113
MTPS STAGE - II KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 39000 1432 69138
BOKARO `B` TPS DVC THERMAL-COAL 63000 145670 31539
MEJIA TPS U 1-3 DVC THERMAL-COAL 63000 348298 31552
MEJIA TPS U 4 DVC THERMAL-COAL 21000 116099 34997
MEJIA TPS U 5-6 DVC THERMAL-COAL 50000 276427 35976
MEJIA TPS U 7-8 DVC THERMAL-COAL 100000 552854 36991
DURGAPUR STEEL TPS DVC THERMAL-COAL 100000 665550 39323
DURGAPUR TPS DVC THERMAL-COAL 21000 59270 35416
RAGHUNATHPUR TPS DVC THERMAL-COAL 120000 201650 35326
MAITHON HYDEL STA DVC HYDRO-HYDRO 6320 12200 17984
CHANDRAPURA TPSU1-3 DVC THERMAL-COAL 42000 257610 35095
CHANDRAPURA TPSU7-8 DVC THERMAL-COAL 50000 306673 34987
KODERMA TPS DVC THERMAL-COAL 100000 380180 38131
PANCHET HPS DVC HYDRO-HYDRO 8000 13360 17984
TILLAYA HPS DVC HYDRO-HYDRO 400 1410 17984
RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34700 35400
TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 277300 23200
TLDP -III NHPC LTD HYDRO-HYDRO 13200 55400 62000
TLDP -IV NHPC LTD HYDRO-HYDRO 16000 60300 25600
FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 957219 33700
FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 308943 41000
BONGAINGAON TPS NTPC LTD THERMAL-COAL 25000 153663 58600
KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 542277 34200
KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 942591 34200
BARH-II NTPC LTD THERMAL-COAL 132000 728021 44500
TALCHER TPS NTPC LTD THERMAL-COAL 46000 335521 30100
TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 702319 25600
TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1436521 24700
STATE SECTOR
BTPS(RampM) BIHAR STATE PGCL THERMAL-COAL 22000 12142 39700
BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 98331 10602
HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 50593 9482
CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 19689 2605
RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 53192 6033
UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 147208 14637
Page 40
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 60353 4519
IB TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 288567 25000
J P H GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 210 038 61100
MEYONG CHU GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 400 1086 61100
TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 122667 38200
DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 214339 43321
KOLAGHAT THERMAL POWER
STATION
WEST BENGAL PDCL THERMAL-COAL 126000 538269 31603
BAKRESHWAR THERMAL POWER
PLANT
WEST BENGAL PDCL THERMAL-COAL 105000 634876 32154
BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 45000 166855 33299
SANTHALDIH THERMAL POWER
STATION
WEST BENGAL PDCL THERMAL-COAL 50000 336442 34932
SAGARDIGHI THERMAL POWER
PROJECT
WEST BENGAL PDCL THERMAL-COAL 160000 423121 34705
JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 20344 68900
RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 24559 68900
TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 4623 68900
PURULIA PUMPED STORAGE
PROJECT
WEST BENGAL SEDCL HYDRO-HYDRO 90000 108816 68900
MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2768 68900
PRIVATE SECTOR
CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 49474 20230
CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 555500 70200
HALDIA ENERGY HALDIA ENERGY LTD THERMAL-COAL 60000 371000 50400
DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3688 63400
KAMALANGA TPS GMR KAMALANGA ENERGY LTD THERMAL-COAL 105000547670
33300
ADHUNIK POWER U-1 ADHUNIK POWER THERMAL-COAL 27000 158 44060
ADHUNIK POWER U-2 ADHUNIK POWER THERMAL-COAL 27000 168 44250
VL-JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 332800 23622
JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 43000 45250
JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 71700 37030
JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 70700 35920
JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 71100 38870
JOJOBERA UNIT 5 TATA POWER COM LTD THERMAL-COAL 12000 79300 44560
JOJOBERA UNIT 6 TATA POWER COM LTD THERMAL-WHR 12000 83700 12840
IEL KALINGANAGAR U-I TATA POWER COM LTD THERMAL-WG 6750 33400 22500
IEL KALINGANAGAR U-II TATA POWER COM LTD THERMAL-WG 6750 34800 22500
MAITHON UNIT 1 amp 2 TATA POWER COM LTD THERMAL-COAL 105000 678000 36100
HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 27500 24340
HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 28400 24340
HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 15800 24310
NORTH EASTERN REGION
CENTRAL SECTOR
LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 74100 36600
AGARTALA GT NEEPCO THERMAL-GAS 13500 88611 27210
ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 153111 32310
DOYANG HEP NEEPCO HYDRO-HYDRO 7500 25598 49801
KOPILI HEP NEEPCO HYDRO-HYDRO 20000 98186 11491
KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 19582 20237
KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 10310 17968
RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 124093 22945
TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 10100 17344 39000
STATE SECTOR
HYDRO POWER (122 Stns) ITANAGAR GOVT OF ARUNACHAL
PRADESHHYDRO-HYDRO 6971 6217270
24600
KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39514 17337
LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 82327 36810
NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 33318 48290
MYNTRIANG SHEP ST II ASSAM POWER GENCO HYDRO-HYDRO 300 567 35776
LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 9130 49200
LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 012 49200
DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 022 49200
TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 000 49200
UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 4990 16000
UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 6476 37000
UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 16494 14600
UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 3600 9556 15000
SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 758 8000
MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44070 44800
KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 154 41400
TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 091 41400
MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 411 41400
MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 394 41400
KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 760 41400
SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 3264 41400
LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 044 41400
BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 18953 28000
ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 43585 28200
GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 4080 11100
Note
LIG Lignite N Naptha WHR Waste Heat Recovery
Page 41
File NoCEA-CH-14-1142018-Coordination Division
अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met
कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )
चडीगढ़ Chandigarh 293 293 0 00 369 369 0 00
दिलली Delhi 5358 5358 0 00 7016 7016 0 00
हरियजणज Haryana 9008 9008 0 00 10270 10270 0 00
दहमजचल परिश Himachal Pradesh 1466 1466 0 00 1479 1479 0 00
रमम कशमीि Jammu amp Kashmir 2951 2361 590 200 2951 2361 590 200
परजब Punjab 11405 11405 0 00 12638 12638 0 00
िजरसथजन Rajasthan 10612 10612 0 00 11698 11698 0 00
उतति परिश Uttar Pradesh 18346 18121 225 12 20498 20062 436 21
उततिजखड Uttarakhand 1996 1996 0 00 2143 2143 0 00
उततरी कषतर Northern Region 56407 55649 758 13 63166 61726 1440 23
छततीसगढ़ Chhattisgarh 4404 4075 328 75 4404 4136 268 61
गरिजत Gujarat 16963 16963 0 00 17053 16963 90 05
मधय परिश Madhya Pradesh 8811 8771 41 05 8811 8775 36 04
महजिजषटर Maharashtra 22455 22349 106 05 23395 23254 141 06
िमन औि दिउ Daman amp Diu 357 356 1 02 357 356 1 02
िजिि व नगि हवली Dadra amp Nagar Haveli 816 815 1 01 816 815 1 01
गोवज Goa 596 596 0 00 596 596 0 00
पशचिमी कषतर Western Region 52933 52895 38 01 53841 52895 945 18
आनधर परिश Andhra Pradesh 9435 9416 19 02 9435 9416 19 02
तलगजनज Telangana 10815 10815 0 00 10815 10815 0 00
कनजाटक Karnataka 10103 10090 13 01 10690 10688 2 00
किल Kerala 3888 3638 251 64 4050 3997 53 13
तममल नजड Tamil Nadu 14556 14553 3 00 15029 14981 47 03
पडचिी Puducherry 390 372 17 45 420 400 19 46
लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0
दकषकषणी कषतर Southern Region 45542 45428 114 02 45946 45684 262 06
बबहजि Bihar 5050 5045 5 01 5050 5045 5 01
िजमोिि घजटी ननगम DVC 2641 2641 0 00 2874 2874 0 00
झजिखणड Jharkhand 1233 1233 0 00 1339 1284 55 41
ओडडशज Odisha 4906 4906 0 00 5357 5357 0 00
पशशचम बगजल West Bengal 8644 8639 5 01 9130 9123 7 01
मसशककम Sikkim 78 78 0 00 90 90 0 00
अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7
परवी कषतर Eastern Region 22110 22100 10 00 22470 22290 180 08
अरणजचल परिश Arunachal Pradesh 132 130 2 15 138 133 5 37
असम Assam 1865 1809 56 30 1865 1809 56 30
मणणपि Manipur 184 182 2 13 193 186 7 36
मघजलय Meghalaya 317 317 0 00 371 368 2 07
ममज़ोिम Mizoram 95 93 2 23 103 98 4 41
नजगजलड Nagaland 142 138 5 32 156 138 18 117
बिपिज Tripura 296 293 3 10 298 293 5 17
उततर-परवी कषतर North-Eastern Region 2921 2850 71 24 2967 2850 117 39
समपणण भारत All India 177022 175528 1494 08 177022 175528 1494 08
26
मजग की पनता म कमी मजग की पनता म कमी Demand not MetDemand not Met
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
Excludes the supply to Bangladesh
अधिकतम वरवदयत आपरतण शथिरत ररपोरण (सशोधित) Peak Power Supply Position Report (Revised)
आकड़ मगज वजट नट Figures in MW net
राजयStateससतबर2018 September2018 अपरल2018 -ससतबर2018 April2018 to September2018
File NoCEA-CH-14-1142018-Coordination Division
अकरबर2018 October2018अपरल2018 -अकरबर2018 April2018 to October2018
उततरी कषतर Northern Region
चडीगढ़ Chandigarh Data not received Data not received
दिलली Delhi
हरियजणज Haryana
दहमजचल परिश Himachal Pradesh
रमम कशमीि Jammu amp Kashmir Data not received Data not received
परजब Punjab
िजरसथजन Rajasthanउतति परिश Uttar Pradesh
उततिजखड Uttarakhand
पशचिमी कषतर Western Region
छततीसगढ़ Chhattisgarh
गरिजत Gujarat
मधय परिश Madhya Pradesh
महजिजषटर Maharashtra
गोवज Goa
दकषकषणी कषतर Southern Region
आनधर परिश Andhra Pradesh
तलगजनज Telangana
कनजाटक Karnataka
किल Kerala
तममल नजड Tamil Nadu
पडचिी Puducherryपरवी कषतर Eastern Region
बबहजि Bihar
झजिखणड Jharkhand
ओडडशज Odisha
पशशचम बगजल West Bengal
N
o No
tified
Cuts
N
o No
tified
Cuts
27
अकरबर 2018 म इडथरीर पर वरवदयत करौती का वरवरवरण Notified Power CutsRestrictions on Industries during October2018
राजय कषतर State Regionऊराणमाग करौती EnergyDemand Cut
No Notified Cuts No Notified Cuts
File NoCEA-CH-14-1142018-Coordination Division
अकरबर2018 October2018अपरल2018 -अकरबर2018 April2018 to October2018
उततरी कषतर Northern Region
चडीगढ़ Chandigarh Data not received Data not received
दिलली Delhi Data not received Data not received
हरियजणज Haryana 940 hrsday 0709 - 0950 hrsday
दहमजचल परिश Himachal Pradesh No cut imposed on agriculture consumers and uninterrupted
power is being supplied to agriculture sector
HPSEBL has only 2 agriculture consumers and uninterrupted
power is being supplied to agriculture sector
रमम कशमीि Jammu amp Kashmir Data not received Data not received
परजब Punjab 0507 hrsday 0349 - 0844 hrsday
िजरसथजन Rajasthan 0630 hrsday 0630 hrsday
उतति परिश Uttar Pradesh 1825 hrsday 1814 - 1858 hrsday
उततिजखड Uttarakhand 2350 hrsday 2128 - 2357 hrsday
पशचिमी कषतर Western Region
छततीसगढ़ Chhattisgarh 18hoursday 18 hrsday
गरिजत Gujarat 805 hrsday 805 hrsday
मधय परिश Madhya Pradesh Three-Phase Supply(Irrigation)-947 hrs day
Three-Phase (Mixed) Supply - 2311 hrs day
Three-Phase Supply(Irrigation)- 0933 - 0947 hrs day Three-
Phase (Mixed) Supply - 2300 - 2320 hrs day
महजिजषटर Maharashtra Three-Phase Supply(Irrigation)- 9 hrs day
Three-Phase (Mixed) Supply - 24 hrs day
Three-Phase Supply(Irrigation)- 9 hrs day
Three-Phase (Mixed) Supply - 24 hrs day
गोवज Goa No restriction No restriction
दकषकषणी कषतर Southern Region
आनधर परिश Andhra Pradesh 07 hrsday 07 hrsday
तलगजनज Telangana 24 hoursday 24 hoursday
कनजाटक Karnataka 6 hrsday 6 hrsday
किल Kerala No Restrictions No Restrictions
तममल नजड Tamil Nadu 9 hrsday (6 hrs during day time and 3 hrs during night time) 9 hrsday (6 hrs during day time and 3 hrs during night time)
पडचिी Puducherry No Restrictions No Restrictions
परवी कषतर Eastern Region
बबहजि Bihar About 18 hrsday About 18 hrsday
झजिखणड Jharkhand About 20 hrsday About 20 hrsday
ओडडशज Odisha 24 hrsday 24 hrsday
पशशचम बगजल West Bengal About 23 hrsday About 23 hrsday
28
अकटबर 2018 कषि कषतर को षिदयत आपरति का षििरण Power Supply to Agricultural Sector during October2018
राजय कषतर State Regionऔसत वरवदयत आपरतण घनरो म Average Hours of Supply
On segregated feeders
File NoCEA-CH-14-1142018-Coordination Division
SNo Contents Page
1 Growth of Installed Capacity since 6th Plan 29
2 Progress of Transmission Sector since 6th Plan 30
3 All India Yearly Coal consumption for Power Generation (Utilities)
4 All India Annual Per Capita Consumption of Electricity since -2006
5 Average cost of power supply amp Average realisation (Paisakwh)
6 Growth of Rural Electrification amp Pump Sets Energisation
7 Status of Hydro Schemes Cleared by the CEA in Oct-2018
Section G - Growth of Power Sector
31
32
File NoCEA-CH-14-1142018-Coordination Division
(In MW)
Coal Gas Diesel Total
End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472
End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634
End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537
End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596
End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921
End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703
End of 12th Plan 19216288 2532938 83763 21832988 6780 4447842 50018 31960630
Up to Oct-2018 19599250 2493722 837629 22176734 6780 4548742 7201281 34604757
Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-17) = 51529 MW
Electricity Generation (MU) Targets and Achievements for 2016-17
Coal Gas Diesel Nuclear Hydro Res Total
1959925 2493722 837629 678000 454874 72012805 22925174
29
1 Growth of Installed Capacity Since 6th Plan
Plan YearThermal
Nuclear Hydro RES (MNRE) Total
Total Installed Capacity 34604757 MW
Coal Gas Diesel Nuclear Hydro Res
File NoCEA-CH-14-1142018-Coordination Division
Progress of Transmission Sector in the Country up to Oct 2018
1 TRANSMISSION LINES (All fig in CKM)
At the end of
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
6th plan 0 0 0 0 0 0 0 0 0 0 0 0 1831 4198 0 6029 1641 44364 0 46005 3472 48562 0 52034
7th plan 0 0 0 0 0 0 0 0 0 0 0 0 13068 6756 0 19824 4560 55071 0 59631 17628 61827 0 79455
8th plan 0 0 0 0 1634 0 0 1634 0 0 0 0 23001 13141 0 36142 6564 73036 0 79600 31199 86177 0 117376
9th plan 0 0 0 0 3234 1504 0 4738 751 409 0 1160 29345 20033 0 49378 8687 88306 0 96993 42017 110252 0 152269
10th plan 0 0 0 0 4368 1504 0 5872 1775 409 0 2184 48708 24730 0 73438 9444 105185 0 114629 64295 131828 0 196123
11th Plan 0 0 0 0 5948 1504 1980 9432 4839 411 0 5250 71023 30191 5605 106819 10140 125010 830 135980 91950 157116 8415 257481
12th Plan 6124 0 0 6124 5948 1504 1980 9432 25465 1177 4598 31240 92482 48240 17065 157787 11014 151276 978 163268 141033 202197 24621 367851
13th Plan (Up
to Mar2018)6124 0 0 6124 5948 1504 1980 9432 28666 1512 4881 35059 98247 54286 19067 171600 11258 156497 1000 168755 150243 213799 26928 390970
13th Plan (Up
to Sep-18)6124 0 0 6124 5948 1504 1980 9432 30952 1512 5059 37523 99683 56069 20662 176414 11318 160958 1000 173276 154025 220043 28701 402769
27150
75050
47900
118050
90650
30
IR addition in 12th Plan (up to
March 2017)
Total IR (up to Oct-18)
IR at the end of 11th Plan
IR at the end of 12th Plan
Envisaged IR Capacity at the end
of 13th Plan
Grand Total
Note - The figure upto the end of 10th plan in for stringing progress including the lines not commissioned Now only commissioned lines are reckoned Accordingly the figure for 10th plan (end) may read as 187555 after adjusting with (-) 10852 Ckm
Inter-regional Power Transfer Capacity
plusmn 800 kV HVDC plusmn 500 kV HVDC 765 kV 400 kV 220 kV
File NoCEA-CH-14-1142018-Coordination Division
2004-05 27800
2005-06 28100
2006-07 30200
2007-08 33000
2008-09 35500
2009-10 36700
2010-11 38700
2011-12 41756
2012-13 45460
2013-14 48940
2014-15 53040
2015-16 54590
2016-17 57430
2017-18 60800
Year
2005-06
2006-07
2007-08
2008-09
2009-10
2010-11
2011-12
2012-13
2013-14
2014-15
2015-16
2016-17
2017-18
2004-05 254 209 7568
2005-06 260 221 7636
2006-07 276 227 7423
2007-08 293 239 7727
2008-09 340 263 8713
2009-10 355 268 8870
2010-11 398 303 11975
2011-12 455 330 13514
2012-13 501 376 14867
2013-14 518 175
2014-15 520
6719
7171
3 All India yearly Coal Consumption for Power Generation (Utilities)
YEARCoal Consumption
Million Tonnes
4 All India Annual per Capita consumption of Electricity Since 2006
Per Capita Consumption ( kWh)
6314
(GrossGen+ Net Import) Mid-year population
5 Average cost of power supply amp average realization ( paiseKWH )
Yearcost of supply
(paiseunit)
Realization(paiseunit)
Including AgricultureOnly
Agriculture
1149
7335
7786
91441
8188
88363
957
1010
1075
1122
File NoCEA-CH-14-1142018-Coordination Division
Source- PFC Reports on the performance of State Power Utilities 31
File NoCEA-CH-14-1142018-Coordination Division
Sl
NoExecuting Agency
Installed
Capacity (MW)Cost (Rs crore)
Date of
Clearance
32
No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification
since 2004-05
65291374575 296361511th Plan
Cumu upto End of 11th Plan
596556 21212860
557439Cummulative up to end of 12th Plan
46708
18423975
499150
2003-042004-05
5743
9769
Cumu upto End of 10th Plan
010407 to 310308
010410 to 310311557976840909
010411 to 310312
412667
86293726
3207
482864
12632
1576036
4451722594
15455554
2314176
397343611750
2093311060316074
65109527813884
6 Growth Of Rural Electrification amp Pumpsets Energisation
Plan Year
9th Plan2002-03
134092626
4111
Pump Sets Energised Villages Electricfied (Nos)
2001-02
284064367244
1218
27801997-981998-991999-002000-01
297594
010408 to 310309010409 to 310310
10th Plan
2005-062006-07
322968331020
Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as
Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received
from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made
available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified
villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is
independent of the earlier published reports
No Hydro Electric Project has been issued concurrenceAppraisal letter by CEA during October 2018
7 Status of Hydro Schemes Cleared by the CEA in Oct-2018
Name of Scheme
File NoCEA-CH-14-1142018-Coordination Division
SN Contents Page
1 Rate of sale of power for the year 2016-17 33-41
RATE OF SALE OF POWER FOR THE YEAR 2016-17
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) NORTHERN REGION
CENTRAL SECTOR
BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 18000 66900 19800
CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 54000 222400 21600
CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 30000 144400 19600
CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 23100 91700 42600
PARBATI - III HPS NHPC LTD HYDRO-HYDRO 52000 68200 54800
DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 28000 95600 30000
CHUTAK NHPC LTD HYDRO-HYDRO 4400 22000 79800
DULHASTI HPS NHPC LTD HYDRO-HYDRO 39000 228000 56400
SALAL HPS NHPC LTD HYDRO-HYDRO 69000 342300 11000
TANAKPUR HPS NHPC LTD HYDRO-HYDRO 9420 43000 29600
URI HPS -I NHPC LTD HYDRO-HYDRO 48000 280300 16000
URI HPS - II NHPC LTD HYDRO-HYDRO 24000 147300 48600
NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 4500 24600 88200
SEWA - II NHPC LTD HYDRO-HYDRO 12000 47100 43400
ANTA CCPP NTPC LTD THERMAL-GASN 41930 67539 32400
AURAIYA CCPP NTPC LTD THERMAL-GASN 66336 53501 39100
BADARPUR TPS NTPC LTD THERMAL-COAL 70500 159153 44800
DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 84000 296170 42300
DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 98000 526686 46300
DADRI CCPP NTPC LTD THERMAL-GASHSD 82978 227469 33000
FARIDABAD CCPP NTPC LTD THERMAL-GASN 43159 115577 30800
RIHAND STPS I NTPC LTD THERMAL-COAL 100000 596766 24500
RIHAND STPS II NTPC LTD THERMAL-COAL 100000 737069 24600
RIHAND STPS III NTPC LTD THERMAL-COAL 100000 706546 30600
SINGRAULI STPS NTPC LTD THERMAL-COAL 200000 1394068 20400
TANDA TPS NTPC LTD THERMAL-COAL 44000 295438 40800
UNCHAHAR TPS I NTPC LTD THERMAL-COAL 42000 256454 39800
UNCHAHAR TPS II NTPC LTD THERMAL-COAL 42000 273577 38900
UNCHAHAR TPS III NTPC LTD THERMAL-COAL 21000 142780 43000
KOLDAM NTPC LTD HYDRO-HYDRO 80000 363260 43600
NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 303575 25841
RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 108000 668677 35374
NJHPS SJVNL HYDRO-HYDRO 150000 699496 23820
RAMPUR HPS SJVNL HYDRO-HYDRO 41202 195982 32260
TEHRI HPP THDC HYDRO-HYDRO 100000 272543 51800
KOTESHWAR HEP THDC HYDRO-HYDRO 40000 106244 53400
IGSTPS JHAJJAR ARAVALI P CPL THERMAL-COAL 150000 510429 49490
NEYVELI BARSINGSAR NEYVELI LIG CORP LTD THERMAL-LIG 25000 127520 38040
STATE SECTOR
PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 21000 14222 48200
PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 21000 19205 48400
PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 25000 102257 42600
PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 25000 62107 41800
DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 60000 312213 41000
RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 120000 35767442200
WYC HYDEL STATION HPGCL HYDRO-HYDRO 6240 20365 24900
GIRI POWER HOUSE HPSEB HYDRO-HYDRO 6000 13958 7600
ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 1695 5467 11900
BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 12000 18528 6700
GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 2250 7462 22500
BASSI POWER HOUSE HPSEB HYDRO-HYDRO 6600 29649 7500
BINWA POWER HOUSE HPSEB HYDRO-HYDRO 600 2749 19300
ANNEXURE-I
RATE OF SALE OF POWER FOR THE YEAR 2016-2017
Page 33
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) GAJ POWER HOUSE HPSEB HYDRO-HYDRO 1050 2914 26700
BANER POWER HOUSE HPSEB HYDRO-HYDRO 1200 2864 16200
HOLI POWER HOUSE HPSEB HYDRO-HYDRO 300 616 22500
THIROT POWER HOUSE HPSEB HYDRO-HYDRO 450 1126 22500
KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 1200 3064 22500
LARJI POWER HOUSE HPSEB HYDRO-HYDRO 12600 53677 23700
NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 250 750 31000
CHABA POWER HOUSE HPSEB HYDRO-HYDRO 175 465 23300
RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 150 101 13400
SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 200 000 22500
KILLAR HPSEB HYDRO-HYDRO 030 050 22500
BHABA AUGUMENP H HPSEB HYDRO-HYDRO 450 1276 22500
BS CHAMBA HPSEB HYDRO-HYDRO 045 099 19500
GUMMA HPSEB HYDRO-HYDRO 300 423 22500
GAS TURBINE POWER STATION IPGCL THERMAL-GAS 27000 67233 39300
PPS-I PPCL THERMAL-GAS 33000 175905 38300
PPS-III PPCL THERMAL-GAS 137120 196879 36100
LOWER JHELUM JampKPDD HYDRO-HYDRO 10500 60214 5100
UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 2260 10514 6300
UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 10500 44202 8500
GANDHARBAL JampKPDD HYDRO-HYDRO 1500 8925 4700
KARNAH MPH JampKPDD HYDRO-HYDRO 200 1122 31000
CHENANI I JampKPDD HYDRO-HYDRO 2330 10892 6600
CHENANI II JampKPDD HYDRO-HYDRO 200 1188 9300
CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 750 3634 14200
IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 375 2108 18500
IGO MERCHELLONG JampKPDD HYDRO-HYDRO 300 1572 29700
PAHALGAM MHP JampKPDD HYDRO-HYDRO 450 1713 32900
MARPACHOO JampKPDD HYDRO-HYDRO 075 375 29800
HAFTAL JampKPDD HYDRO-HYDRO 100 483 28700
SANJAK JampKPDD HYDRO-HYDRO 126 441 36000
SEWA-III JampKPDD HYDRO-HYDRO 900 3273 20200
BHADERWAH JampKPDD HYDRO-HYDRO 150 935 8900
BAZGO JampKPDD HYDRO-HYDRO 030 108 33300
SUMOOR JampKPDD HYDRO-HYDRO 010 045 35400
HUNDER JampKPDD HYDRO-HYDRO 040 176 26200
STAKNA JampKPDD HYDRO-HYDRO 400 1933 4100
KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 124000 662879 31360
SURATGARH TPS RRVUNL THERMAL-COAL 150000 402328 41730
CHHABRA TPS 1amp 2 RRVUNL THERMAL-COAL 50000 305946 36700
CHHABRA TPS 3 RRVUNL THERMAL-COAL 25000 151536 36700
CHHABRA TPS 4 RRVUNL THERMAL-COAL 25000 155896 36700
RAMGARH GT POWER PROJECT RRVUNL THERMAL-COAL 22050 43177 41800
RAMGARH GAS T P PROJECT 3 RRVUNL THERMAL-GAS 5000 93615 41800
DHOLPUR C C POWER PROJECT RRVUNL THERMAL-R-LNG 33000 9486 46110
MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 14000 20855 34192
MINI MICRO HYDEL (MMH) P S RRVUNL HYDRO-HYDRO 2385 851 37800
KALISINDH TPP 1 RRVUNL THERMAL-COAL 60000 341543 45000
KALISINDH TPP 2 RRVUNL THERMAL-COAL 60000 211588 45000
KHARA HEP UPJVNL HYDRO-HYDRO 7200 26654 7200
MATATILLA HEP UPJVNL HYDRO-HYDRO 3060 12219 6500
OBRA HEP UPJVNL HYDRO-HYDRO 9900 21517 6300
RIHAND UPJVNL HYDRO-HYDRO 30000 57369 5500
ANPARA A TPS UPRVUNL THERMAL-COAL 63000 317536 27000
ANPARA B TPS UPRVUNL THERMAL-COAL 100000 705605 22700
ANPARA D UPRVUNL THERMAL-COAL 100000 300158 39800
HARDUAGANJ TPS UPRVUNL THERMAL-COAL 16500 45817 49200
HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 50000 304389 46600
OBRA A TPS UPRVUNL THERMAL-COAL 28800 13158 34000
OBRA B TPS UPRVUNL THERMAL-COAL 100000 328124 21900
Page 34
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) PANKI TPS UPRVUNL THERMAL-COAL 21000 66488 50300
PARICHHA TPS UPRVUNL THERMAL-COAL 22000 38762 49400
PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 42000 231931 45600
PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 50000 276722 50400
CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 24000 70845 8290
CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 14400 75366 8390
DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 3375 9595 12080
DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 5100 18701 10520
KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4140 17359 12330
KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 12000 33001 9420
KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 3000 11953 8320
TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 9000 33983 12460
MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 30400 124510 16110
RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 19800 17897 10550
MPUR UTTARAKHAND JVNL HYDRO-HYDRO 930 5121 19200
PATHRI UTTARAKHAND JVNL HYDRO-HYDRO 2040 11636 14200
GALOGI UTTARAKHAND JVNL HYDRO-HYDRO 300 648 12500
PRIVATE SECTOR
MGTPP CLP INDIA PVT LTD THERMAL-COAL 132000 268902 41940
SHRINAGAR HEP ALAKNANDA HPCL HYDRO-HYDRO 33000 127414 48800
GAMA INFRAPROP CCPP GAMA INFRAPROP PVT THERMAL-GAS 22500 52686 47000
PPGCL (BARA) JP POWER VENTURES LTD THERMAL-COAL 198000 448200 38500
MALANA HEP MALANA PCL HYDRO-HYDRO 8600 26354 29792
MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 10000 30369 32580
ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 19200 56347 36079
KASHANG HEP H P PCL HYDRO-HYDRO 19500 5034 29200
BASPA-II HEP HBPCL HYDRO-HYDRO 30000 132769 13600
KARCHAM WANGTOO HEP HBPCL HYDRO-HYDRO 100000 434386 36600
RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 108000 582600 43700
RITHALA COMBI CY POWER PLANT TATA POWER DDL THERMAL-GAS 9480 000 11900
RAJPURA TPS NABHA POWER LTD THERMAL-GAS 140000 901484 39000
TALWANDI SABO POWER LTD TALWANDI SABO POWER LTD THERMAL-COAL 198000 636040 49548
ROJA THERMAL POWER STATION ROJA POWER SCL THERMAL-COAL 120000 727200 43400
KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 34400 63400
BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 36000 62600
MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 38200 60800
UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 37900 61500
KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 42300 58800
LALITPUR PGCL BAJAJ ENERGY PVT LTD THERMAL-COAL 198000 359400 47300
PRAYAGRAJ PGCL PRAYAGRAJ PGCL THERMAL-COAL 132000 448200 38595
KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 132000 783182 33438
WESTERN REGION
CENTRAL SECTOR
INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 100000 325333 23892
OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 52000 141663 34001
GANDHAR CCPP NTPC LTD THERMAL-GAS 65739 221924 28700
KAWAS CCPP NTPC LTD THERMAL-GASN 65620 167929 27000
KORBA I amp II NTPC LTD THERMAL-COAL 210000 1499171 20500
KORBA III NTPC LTD THERMAL-COAL 50000 358746 26600
SIPAT STPS I NTPC LTD THERMAL-COAL 198000 1479902 26800
SIPAT STPS II NTPC LTD THERMAL-COAL 100000 766549 26500
VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 126000 693142 25800
VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 100000 608781 23800
VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 100000 673475 27600
VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 100000 655924 32900
VINDHYACHAL STPS V NTPC LTD THERMAL-COAL 50000 328265 31700
MOUDA I NTPC LTD THERMAL-COAL 100000 343130 44500
MOUDA Ii NTPC LTD THERMAL-COAL 66000 40637 39900
RATNAGIRI GAS amp POWER PVT LTD RGPPL THERMAL-GAS 196708 442485 47000
KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 000 24729
TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 32000 201227 10740
Page 35
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 365122 19069
TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 787444 29324
STATE SECTOR
GSEG-HAZIRA15610 MW GUJARAT S ENEGEN LTD THERMAL-GAS 15610 1805 28200
GSEG-HAZIRA35143 MW GUJARAT S ENEGEN LTD THERMAL-GAS 35130 22276 51300
GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 21978 51800
AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 13929 26100
KORBA TPS EAST CSPGCL THERMAL-COAL 44000 198673 33880
DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 365808 27570
KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 316500 30420
HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 532878 19410
CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 515 58300
MTTPS CHAMPA U-I CSPGCL THERMAL-COAL 50000 220376 39000
MTTPS CHAMPA U-II CSPGCL THERMAL-COAL 50000 23709 10000
SHP GANGREL CSPGCL HYDRO-HYDRO 1000 2350 36790
BANGO HEP CSPGCL HYDRO-HYDRO 12000 14662 8900
MHP KORBA WEST CSPGCL HYDRO-HYDRO 170 859 38190
SIKASAR HEP CSPGCL HYDRO-HYDRO 700 418 26870
DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8843 74500
DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 19446 51500
GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 66388 71600
GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127488 41300
KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 96072 43900
KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 29841 56400
SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 184966 58800
UKAI 1-5 GSECL THERMAL-COAL 85000 204891 46900
UKAI TPS 6 GSECL THERMAL-COAL 50000 284448 48200
WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 271999 58300
WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 82808 44100
KADANA HPS GSECL HYDRO-HYDRO 24200 34433 16800
UKAI HPS GSECL HYDRO-HYDRO 30500 40585 6100
TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 123000 11500
BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 8900 10900
BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 7200 27500
JHINNA HPS MPPGCL HYDRO-HYDRO 2000 9700 18500
RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 44300 3400
GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 17300 4600
SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 4100 16900
MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 14600 27000
PENCH HPS MPPGCL HYDRO-HYDRO 16000 23700 8100
RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 3000 16900
AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 134400 35100
SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 283800 38700
SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 344600 34300
SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 111600 61600
SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 211800 58000
SSTPS PH-I MPPGCL THERMAL-COAL 120000 233100 84300
BHUSAWAL TPS MSPGCL THERMAL-COAL 142000 566258 51100
CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1365682 33700
KHAPERKHEDA MSPGCL THERMAL-COAL 134000 706207 39100
KORADI TPS MSPGCL THERMAL-COAL 62000 443206 42000
NASIK TPS MSPGCL THERMAL-COAL 63000 297275 47000
PARLI TPS MSPGCL THERMAL-COAL 113000 175934 71600
PARAS MSPGCL THERMAL-COAL 50000 267931 38700
URAN CCPP MSPGCL THERMAL-GAS 67200 320330 30600
KOYANA MSPGCL HYDRO-HYDRO 195600 328155 13100
SMALL HYDRO POWER PLANTS MSPGCL HYDRO-HYDRO 45400 93062 30500
BHIRA MSPGCL HYDRO-HYDRO 8000 10046 8400
TILLARI MSPGCL HYDRO-HYDRO 8900 10584 3100
SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 233298 20500
SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 87633 20500
PRIVATE SECTOR
Page 36
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 81282 46750
JNSTPP(JAYPEE NIGRIE) JP POWER VENTURES LTD THERMAL-COAL 132000 726695 29310
MB POWER MB POWER THERMAL-COAL 120000 345632 38310
ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 754922 28671
ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 780761 23495
ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 198000 1263784 32090
ADANI POWER MAHARA ADANI POWER LTD THERMAL-COAL 330000 1666191 34124
AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 170065 36827
SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 252035 45129
ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 458551 36000
ESSAR POWER MP LTD ESSAR POWER MP LTD THERMAL-COAL 60000 243040 28600
VEDANTA LTD (P P -I) VEDANTA LTD THERMAL-GAS 3000 15044 24000
VEDANTA LTD (P P -II) VEDANTA LTD THERMAL-GAS 3000 21293 24000
PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 8234600 24000
165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 5850 64390
145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 68717 40349
SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 132655 28776
SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 144686 38567
MUNDRA UMPPCOASTAL GUJARAT POWER
LTD THERMAL-IMP COAL 400000 2530300
23900
LANCO AMARKANTAK TPP PATHADIH
U-ILANCO AMARKAN POWER LTD THERMAL-COAL 30000 195500
29200
LANCO AMARKANTAK TPP PATHADIH
U-IILANCO AMARKAN POWER LTD THERMAL-COAL 30000 206900
27600
BARADARHA TPS D B POWER LTD THERMAL-COAL 120000 677373 29200
JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 405000 28900
JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 453000 40500
DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 339437 40700
TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 293400 44000
TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 137200 37000
TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 174900 44000
BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 92900 14100
BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23700 34300
KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 27600 48300
CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2530300 23900
BHANDARDRA HEP -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 2475 54900
SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 161400 26500
SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 445000 39000
SOTHERN REGION
CENTRAL SECTOR
NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 325699 54820
NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 305532 39880
NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 998805 38510
NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 113016 54070
NEYVELI TAMILNADU POWER LTD JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 625274 42200
VALLUR TPS NTPC TECL THERMAL-COAL 150000 856438 42350
R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 1493 84300
RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1502919 29400
RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 341291 31800
SIMHADRI I NTPC LTD THERMAL-COAL 100000 688382 36800
SIMHADRI II NTPC LTD THERMAL-COAL 100000 663657 43400
KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 593110 31324
MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 291625 21764
KKNPP-1 amp 2 NPCIL NUCLEAR-NUCLEAR 200000 572609 40948
MINICOY LAKSHADEEP THERMAL-DIESEL 340 770 29600
KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1097 29600
AMINI LAKSHADEEP THERMAL-DIESEL 265 509 29600
ANDROTT LAKSHADEEP THERMAL-DIESEL 219 524 29600
KALPENI LAKSHADEEP THERMAL-DIESEL 175 356 29600
AGATTI LAKSHADEEP THERMAL-DIESEL 195 658 29600
KADMAT LAKSHADEEP THERMAL-DIESEL 190 414 29600
KILTAN LAKSHADEEP THERMAL-DIESEL 150 269 29600
CHETLET LAKSHADEEP THERMAL-DIESEL 100 139 29600
BITRA LAKSHADEEP THERMAL-DIESEL 043 024 29600
BANGARAM LAKSHADEEP THERMAL-DIESEL 018 009 29600
Page 37
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) STATE SECTOR
Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 721811 46500
Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 50000 336142 46500
RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 237358 46500
RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 239926 46500
RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 124500 46500
SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 62109 46500
UPPER SILERU APGENCO HYDRO-HYDRO 24000 33000 46500
LOWER SILERU APGENCO HYDRO-HYDRO 46000 81066 46500
DONKARAI APGENCO HYDRO-HYDRO 2500 6007 46500
PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 1262 46500
CHETTIPETA APGENCO HYDRO-HYDRO 100 214 46500
MUCHKUND APGENCO HYDRO-HYDRO 12000 37571 46500
NAGARJUNASAGAR RCPH APGENCO HYDRO-HYDRO 9000 606 46500
TUNGABHADRA HES amp HAMPI(AP
Share)
APGENCO HYDRO-HYDRO 7200 6100 46500
KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 352232 42600
KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 288131 32500
KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 319272 46500
RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 40073 44300
KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 308317 46000
KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 308963 51300
SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 61004 76600
NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 17960 75300
PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 20873 58300
POCHAMPAD-I TSPGENCO HYDRO-HYDRO 2700 5455 29800
POCHAMPAD-II TSPGENCO HYDRO-HYDRO 900 1932 40700
NIZAMSAGAR TSPGENCO HYDRO-HYDRO 1000 1126 53400
RAICHUR TPS 1 to 7 KPCL THERMAL-COAL 147000 890866 43800
RAICHUR TPS 8 KPCL THERMAL-COAL 25000 159523 48200
BELLARI TPS 1 KPCL THERMAL-COAL 50000 318679 51100
BELLARI TPS 2 KPCL THERMAL-COAL 50000 232347 55600
BELLARI TPS 3 KPCL THERMAL-COAL 70000 47565 34400
BHADRA PH KPCL HYDRO-HYDRO 3920 2369 45900
GERUSUPPA PH KPCL HYDRO-HYDRO 24000 26990 22000
GHAT PRABHA HEP KPCL HYDRO-HYDRO 3200 4777 25300
KADRA HPS KPCL HYDRO-HYDRO 15000 16889 26800
NAGJHARI KPCL HYDRO-HYDRO 90000 155159 9800
KODASALLI DPH KPCL HYDRO-HYDRO 12000 14854 19200
MUNIRA+MGH+SPH+SPH KPCL HYDRO-HYDRO 22640 48211 7900
SHARAVATHY HPS KPCL HYDRO-HYDRO 108550 276215 5400
ALMATTI DPH KPCL HYDRO-HYDRO 29000 39611 24600
VARAHI UGPH KPCL HYDRO-HYDRO 46000 71368 15600
IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 17196 15300
IDUKKI HPS KSEB HYDRO-HYDRO 78000 137905 15300
KAKKAD HPS KSEB HYDRO-HYDRO 5000 13063 15300
KALLADA HPS KSEB HYDRO-HYDRO 1500 4436 15300
KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 46544 15300
KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 635 15300
LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 30822 15300
MALANKARA HPS KSEB HYDRO-HYDRO 1050 2474 15300
MATTUPETTY KSEB HYDRO-HYDRO 200 230 15300
MALAMPUZHA KSEB HYDRO-HYDRO 250 063 15300
CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 864 15300
URUMI ST I amp II KSEB HYDRO-HYDRO 615 903 15300
LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 248 15300
NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7765 19625 15300
PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 16601 15300
PANNIAR HPS KSEB HYDRO-HYDRO 3240 6217 15300
PORINGALKUTHU KSEB HYDRO-HYDRO 3600 10052 15300
PORINGALKUTHU LBE KSEB HYDRO-HYDRO 1600 9438 15300
PEPPARA KSEB HYDRO-HYDRO 300 395 15300
POOZHITHODE KSEB HYDRO-HYDRO 480 1045 15300
Page 38
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) PEECHI KSEB HYDRO-HYDRO 125 040 15300
RANI-PERUNADU KSEB HYDRO-HYDRO 400 585 15300
SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 79783 15300
SENGULAM HPS KSEB HYDRO-HYDRO 5120 11558 15300
SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 16711 15300
VILANGAD KSEB HYDRO-HYDRO 750 1578 15300
BARAPOLE KSEB HYDRO-HYDRO 1500 1932 15300
VELLATHOOVAL KSEB HYDRO-HYDRO 360 305 15300
CHIM0NY KSEB HYDRO-HYDRO 250 156 15300
ADYANPARA KSEB HYDRO-HYDRO 350 501 15300
BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 554 15300
KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 3801 15300
KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 23132 32800
ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 14416 62280
METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 523970 62280
METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 321270 62280
NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 336575 62280
NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 591240 62280
TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 508966 62280
KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 30897 62280
VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 18720 90699 62280
KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 33593 62280
BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 1047 62280
PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 1250 62280
PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 330 62280
MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 4897 62280
MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 032 62280
KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15681 62280
KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 40608 62280
KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 21342 62280
KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 4717 62280
KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4322 62280
KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2399 62280
METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 4416 62280
METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 8035 62280
BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2187 62280
BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2359 62280
BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2511 62280
BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 1949 62280
BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 1819 62280
POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 172 62280
SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 241 62280
MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 026 62280
THIRUMOORTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 136 62280
PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 9309 62280
VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 353 62280
SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 4192 62280
PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 6571 62280
SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 1186 62280
SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6319 62280
ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 6122 62280
KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 28674 62280
SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 18381 62280
SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 4258 62280
KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 12680 62280
KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4201 62280
ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 000 62280
PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 19175 62280
AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 078 62280
BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 504 62280
BHAVANI KATTALAI (BKB)(IIIampIII BB I amp II)TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 5847 62280
PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 000 62280
Page 39
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) SRI DAMODARAM STPS APPDCL THERMAL-COAL 160000 808108 36300
PRIVATE SECTOR
KARUPPUR TANJORE LANCO TANJORE PCL THERMAL-GAS 12000 48096 28770
SIMHAPURI ENERGY LTD SIMHAPURI ENERGY LTD THERMAL-COAL 60000 143900 39100
JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 7111 45500
SBU 1 JSW ENERGY LTD
VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 26000 159100
43300
SBU 2 JSW ENERGY LTD
VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 60000 247900
42800
LANCO KPLLANCO KONDAPALLI POWER
LTDTHERMAL-GAS 36814 85060
25776
LANCO KPL STG -IILANCO KONDAPALLI POWER
LTDTHERMAL-GAS 36600 12979
46330
LANCO KPL STG -IIIALANCO KONDAPALLI POWER
LTDTHERMAL-GAS 37100 85710
46330
LANCO KPL STG -III BLANCO KONDAPALLI POWER
LTDTHERMAL-GAS 37100 43639
46330
HINDUJA NATIONAL PCL HINDUJA NATIONAL PCL THERMAL-COAL 104000 303000 38200
MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 121164 49940
UDUPI POWER COR LTD ADANI POWER LTD THERMAL-COAL 120000 754613 42500
SPECTRUM POWER GENERATION
LTD SPECTRUM PG LTD THERMAL-GASN 20525 9256812
34952
TAQA NEYVELI POWER COM PVT
LTD TAQA NEYVELI THERMAL-LIG 25000 5840
34500
ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 251000 51000
ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 207860 36800
GMR VEMAGIRI POWER GENERATION
LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 30117
46450
EASTERN REGION
CENTRAL SECTOR
MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 64675 53113
MTPS STAGE - II KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 39000 1432 69138
BOKARO `B` TPS DVC THERMAL-COAL 63000 145670 31539
MEJIA TPS U 1-3 DVC THERMAL-COAL 63000 348298 31552
MEJIA TPS U 4 DVC THERMAL-COAL 21000 116099 34997
MEJIA TPS U 5-6 DVC THERMAL-COAL 50000 276427 35976
MEJIA TPS U 7-8 DVC THERMAL-COAL 100000 552854 36991
DURGAPUR STEEL TPS DVC THERMAL-COAL 100000 665550 39323
DURGAPUR TPS DVC THERMAL-COAL 21000 59270 35416
RAGHUNATHPUR TPS DVC THERMAL-COAL 120000 201650 35326
MAITHON HYDEL STA DVC HYDRO-HYDRO 6320 12200 17984
CHANDRAPURA TPSU1-3 DVC THERMAL-COAL 42000 257610 35095
CHANDRAPURA TPSU7-8 DVC THERMAL-COAL 50000 306673 34987
KODERMA TPS DVC THERMAL-COAL 100000 380180 38131
PANCHET HPS DVC HYDRO-HYDRO 8000 13360 17984
TILLAYA HPS DVC HYDRO-HYDRO 400 1410 17984
RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34700 35400
TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 277300 23200
TLDP -III NHPC LTD HYDRO-HYDRO 13200 55400 62000
TLDP -IV NHPC LTD HYDRO-HYDRO 16000 60300 25600
FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 957219 33700
FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 308943 41000
BONGAINGAON TPS NTPC LTD THERMAL-COAL 25000 153663 58600
KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 542277 34200
KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 942591 34200
BARH-II NTPC LTD THERMAL-COAL 132000 728021 44500
TALCHER TPS NTPC LTD THERMAL-COAL 46000 335521 30100
TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 702319 25600
TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1436521 24700
STATE SECTOR
BTPS(RampM) BIHAR STATE PGCL THERMAL-COAL 22000 12142 39700
BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 98331 10602
HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 50593 9482
CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 19689 2605
RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 53192 6033
UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 147208 14637
Page 40
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 60353 4519
IB TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 288567 25000
J P H GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 210 038 61100
MEYONG CHU GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 400 1086 61100
TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 122667 38200
DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 214339 43321
KOLAGHAT THERMAL POWER
STATION
WEST BENGAL PDCL THERMAL-COAL 126000 538269 31603
BAKRESHWAR THERMAL POWER
PLANT
WEST BENGAL PDCL THERMAL-COAL 105000 634876 32154
BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 45000 166855 33299
SANTHALDIH THERMAL POWER
STATION
WEST BENGAL PDCL THERMAL-COAL 50000 336442 34932
SAGARDIGHI THERMAL POWER
PROJECT
WEST BENGAL PDCL THERMAL-COAL 160000 423121 34705
JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 20344 68900
RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 24559 68900
TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 4623 68900
PURULIA PUMPED STORAGE
PROJECT
WEST BENGAL SEDCL HYDRO-HYDRO 90000 108816 68900
MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2768 68900
PRIVATE SECTOR
CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 49474 20230
CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 555500 70200
HALDIA ENERGY HALDIA ENERGY LTD THERMAL-COAL 60000 371000 50400
DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3688 63400
KAMALANGA TPS GMR KAMALANGA ENERGY LTD THERMAL-COAL 105000547670
33300
ADHUNIK POWER U-1 ADHUNIK POWER THERMAL-COAL 27000 158 44060
ADHUNIK POWER U-2 ADHUNIK POWER THERMAL-COAL 27000 168 44250
VL-JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 332800 23622
JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 43000 45250
JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 71700 37030
JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 70700 35920
JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 71100 38870
JOJOBERA UNIT 5 TATA POWER COM LTD THERMAL-COAL 12000 79300 44560
JOJOBERA UNIT 6 TATA POWER COM LTD THERMAL-WHR 12000 83700 12840
IEL KALINGANAGAR U-I TATA POWER COM LTD THERMAL-WG 6750 33400 22500
IEL KALINGANAGAR U-II TATA POWER COM LTD THERMAL-WG 6750 34800 22500
MAITHON UNIT 1 amp 2 TATA POWER COM LTD THERMAL-COAL 105000 678000 36100
HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 27500 24340
HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 28400 24340
HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 15800 24310
NORTH EASTERN REGION
CENTRAL SECTOR
LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 74100 36600
AGARTALA GT NEEPCO THERMAL-GAS 13500 88611 27210
ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 153111 32310
DOYANG HEP NEEPCO HYDRO-HYDRO 7500 25598 49801
KOPILI HEP NEEPCO HYDRO-HYDRO 20000 98186 11491
KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 19582 20237
KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 10310 17968
RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 124093 22945
TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 10100 17344 39000
STATE SECTOR
HYDRO POWER (122 Stns) ITANAGAR GOVT OF ARUNACHAL
PRADESHHYDRO-HYDRO 6971 6217270
24600
KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39514 17337
LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 82327 36810
NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 33318 48290
MYNTRIANG SHEP ST II ASSAM POWER GENCO HYDRO-HYDRO 300 567 35776
LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 9130 49200
LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 012 49200
DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 022 49200
TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 000 49200
UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 4990 16000
UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 6476 37000
UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 16494 14600
UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 3600 9556 15000
SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 758 8000
MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44070 44800
KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 154 41400
TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 091 41400
MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 411 41400
MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 394 41400
KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 760 41400
SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 3264 41400
LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 044 41400
BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 18953 28000
ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 43585 28200
GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 4080 11100
Note
LIG Lignite N Naptha WHR Waste Heat Recovery
Page 41
File NoCEA-CH-14-1142018-Coordination Division
अकरबर2018 October2018अपरल2018 -अकरबर2018 April2018 to October2018
उततरी कषतर Northern Region
चडीगढ़ Chandigarh Data not received Data not received
दिलली Delhi
हरियजणज Haryana
दहमजचल परिश Himachal Pradesh
रमम कशमीि Jammu amp Kashmir Data not received Data not received
परजब Punjab
िजरसथजन Rajasthanउतति परिश Uttar Pradesh
उततिजखड Uttarakhand
पशचिमी कषतर Western Region
छततीसगढ़ Chhattisgarh
गरिजत Gujarat
मधय परिश Madhya Pradesh
महजिजषटर Maharashtra
गोवज Goa
दकषकषणी कषतर Southern Region
आनधर परिश Andhra Pradesh
तलगजनज Telangana
कनजाटक Karnataka
किल Kerala
तममल नजड Tamil Nadu
पडचिी Puducherryपरवी कषतर Eastern Region
बबहजि Bihar
झजिखणड Jharkhand
ओडडशज Odisha
पशशचम बगजल West Bengal
N
o No
tified
Cuts
N
o No
tified
Cuts
27
अकरबर 2018 म इडथरीर पर वरवदयत करौती का वरवरवरण Notified Power CutsRestrictions on Industries during October2018
राजय कषतर State Regionऊराणमाग करौती EnergyDemand Cut
No Notified Cuts No Notified Cuts
File NoCEA-CH-14-1142018-Coordination Division
अकरबर2018 October2018अपरल2018 -अकरबर2018 April2018 to October2018
उततरी कषतर Northern Region
चडीगढ़ Chandigarh Data not received Data not received
दिलली Delhi Data not received Data not received
हरियजणज Haryana 940 hrsday 0709 - 0950 hrsday
दहमजचल परिश Himachal Pradesh No cut imposed on agriculture consumers and uninterrupted
power is being supplied to agriculture sector
HPSEBL has only 2 agriculture consumers and uninterrupted
power is being supplied to agriculture sector
रमम कशमीि Jammu amp Kashmir Data not received Data not received
परजब Punjab 0507 hrsday 0349 - 0844 hrsday
िजरसथजन Rajasthan 0630 hrsday 0630 hrsday
उतति परिश Uttar Pradesh 1825 hrsday 1814 - 1858 hrsday
उततिजखड Uttarakhand 2350 hrsday 2128 - 2357 hrsday
पशचिमी कषतर Western Region
छततीसगढ़ Chhattisgarh 18hoursday 18 hrsday
गरिजत Gujarat 805 hrsday 805 hrsday
मधय परिश Madhya Pradesh Three-Phase Supply(Irrigation)-947 hrs day
Three-Phase (Mixed) Supply - 2311 hrs day
Three-Phase Supply(Irrigation)- 0933 - 0947 hrs day Three-
Phase (Mixed) Supply - 2300 - 2320 hrs day
महजिजषटर Maharashtra Three-Phase Supply(Irrigation)- 9 hrs day
Three-Phase (Mixed) Supply - 24 hrs day
Three-Phase Supply(Irrigation)- 9 hrs day
Three-Phase (Mixed) Supply - 24 hrs day
गोवज Goa No restriction No restriction
दकषकषणी कषतर Southern Region
आनधर परिश Andhra Pradesh 07 hrsday 07 hrsday
तलगजनज Telangana 24 hoursday 24 hoursday
कनजाटक Karnataka 6 hrsday 6 hrsday
किल Kerala No Restrictions No Restrictions
तममल नजड Tamil Nadu 9 hrsday (6 hrs during day time and 3 hrs during night time) 9 hrsday (6 hrs during day time and 3 hrs during night time)
पडचिी Puducherry No Restrictions No Restrictions
परवी कषतर Eastern Region
बबहजि Bihar About 18 hrsday About 18 hrsday
झजिखणड Jharkhand About 20 hrsday About 20 hrsday
ओडडशज Odisha 24 hrsday 24 hrsday
पशशचम बगजल West Bengal About 23 hrsday About 23 hrsday
28
अकटबर 2018 कषि कषतर को षिदयत आपरति का षििरण Power Supply to Agricultural Sector during October2018
राजय कषतर State Regionऔसत वरवदयत आपरतण घनरो म Average Hours of Supply
On segregated feeders
File NoCEA-CH-14-1142018-Coordination Division
SNo Contents Page
1 Growth of Installed Capacity since 6th Plan 29
2 Progress of Transmission Sector since 6th Plan 30
3 All India Yearly Coal consumption for Power Generation (Utilities)
4 All India Annual Per Capita Consumption of Electricity since -2006
5 Average cost of power supply amp Average realisation (Paisakwh)
6 Growth of Rural Electrification amp Pump Sets Energisation
7 Status of Hydro Schemes Cleared by the CEA in Oct-2018
Section G - Growth of Power Sector
31
32
File NoCEA-CH-14-1142018-Coordination Division
(In MW)
Coal Gas Diesel Total
End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472
End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634
End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537
End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596
End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921
End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703
End of 12th Plan 19216288 2532938 83763 21832988 6780 4447842 50018 31960630
Up to Oct-2018 19599250 2493722 837629 22176734 6780 4548742 7201281 34604757
Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-17) = 51529 MW
Electricity Generation (MU) Targets and Achievements for 2016-17
Coal Gas Diesel Nuclear Hydro Res Total
1959925 2493722 837629 678000 454874 72012805 22925174
29
1 Growth of Installed Capacity Since 6th Plan
Plan YearThermal
Nuclear Hydro RES (MNRE) Total
Total Installed Capacity 34604757 MW
Coal Gas Diesel Nuclear Hydro Res
File NoCEA-CH-14-1142018-Coordination Division
Progress of Transmission Sector in the Country up to Oct 2018
1 TRANSMISSION LINES (All fig in CKM)
At the end of
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
6th plan 0 0 0 0 0 0 0 0 0 0 0 0 1831 4198 0 6029 1641 44364 0 46005 3472 48562 0 52034
7th plan 0 0 0 0 0 0 0 0 0 0 0 0 13068 6756 0 19824 4560 55071 0 59631 17628 61827 0 79455
8th plan 0 0 0 0 1634 0 0 1634 0 0 0 0 23001 13141 0 36142 6564 73036 0 79600 31199 86177 0 117376
9th plan 0 0 0 0 3234 1504 0 4738 751 409 0 1160 29345 20033 0 49378 8687 88306 0 96993 42017 110252 0 152269
10th plan 0 0 0 0 4368 1504 0 5872 1775 409 0 2184 48708 24730 0 73438 9444 105185 0 114629 64295 131828 0 196123
11th Plan 0 0 0 0 5948 1504 1980 9432 4839 411 0 5250 71023 30191 5605 106819 10140 125010 830 135980 91950 157116 8415 257481
12th Plan 6124 0 0 6124 5948 1504 1980 9432 25465 1177 4598 31240 92482 48240 17065 157787 11014 151276 978 163268 141033 202197 24621 367851
13th Plan (Up
to Mar2018)6124 0 0 6124 5948 1504 1980 9432 28666 1512 4881 35059 98247 54286 19067 171600 11258 156497 1000 168755 150243 213799 26928 390970
13th Plan (Up
to Sep-18)6124 0 0 6124 5948 1504 1980 9432 30952 1512 5059 37523 99683 56069 20662 176414 11318 160958 1000 173276 154025 220043 28701 402769
27150
75050
47900
118050
90650
30
IR addition in 12th Plan (up to
March 2017)
Total IR (up to Oct-18)
IR at the end of 11th Plan
IR at the end of 12th Plan
Envisaged IR Capacity at the end
of 13th Plan
Grand Total
Note - The figure upto the end of 10th plan in for stringing progress including the lines not commissioned Now only commissioned lines are reckoned Accordingly the figure for 10th plan (end) may read as 187555 after adjusting with (-) 10852 Ckm
Inter-regional Power Transfer Capacity
plusmn 800 kV HVDC plusmn 500 kV HVDC 765 kV 400 kV 220 kV
File NoCEA-CH-14-1142018-Coordination Division
2004-05 27800
2005-06 28100
2006-07 30200
2007-08 33000
2008-09 35500
2009-10 36700
2010-11 38700
2011-12 41756
2012-13 45460
2013-14 48940
2014-15 53040
2015-16 54590
2016-17 57430
2017-18 60800
Year
2005-06
2006-07
2007-08
2008-09
2009-10
2010-11
2011-12
2012-13
2013-14
2014-15
2015-16
2016-17
2017-18
2004-05 254 209 7568
2005-06 260 221 7636
2006-07 276 227 7423
2007-08 293 239 7727
2008-09 340 263 8713
2009-10 355 268 8870
2010-11 398 303 11975
2011-12 455 330 13514
2012-13 501 376 14867
2013-14 518 175
2014-15 520
6719
7171
3 All India yearly Coal Consumption for Power Generation (Utilities)
YEARCoal Consumption
Million Tonnes
4 All India Annual per Capita consumption of Electricity Since 2006
Per Capita Consumption ( kWh)
6314
(GrossGen+ Net Import) Mid-year population
5 Average cost of power supply amp average realization ( paiseKWH )
Yearcost of supply
(paiseunit)
Realization(paiseunit)
Including AgricultureOnly
Agriculture
1149
7335
7786
91441
8188
88363
957
1010
1075
1122
File NoCEA-CH-14-1142018-Coordination Division
Source- PFC Reports on the performance of State Power Utilities 31
File NoCEA-CH-14-1142018-Coordination Division
Sl
NoExecuting Agency
Installed
Capacity (MW)Cost (Rs crore)
Date of
Clearance
32
No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification
since 2004-05
65291374575 296361511th Plan
Cumu upto End of 11th Plan
596556 21212860
557439Cummulative up to end of 12th Plan
46708
18423975
499150
2003-042004-05
5743
9769
Cumu upto End of 10th Plan
010407 to 310308
010410 to 310311557976840909
010411 to 310312
412667
86293726
3207
482864
12632
1576036
4451722594
15455554
2314176
397343611750
2093311060316074
65109527813884
6 Growth Of Rural Electrification amp Pumpsets Energisation
Plan Year
9th Plan2002-03
134092626
4111
Pump Sets Energised Villages Electricfied (Nos)
2001-02
284064367244
1218
27801997-981998-991999-002000-01
297594
010408 to 310309010409 to 310310
10th Plan
2005-062006-07
322968331020
Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as
Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received
from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made
available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified
villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is
independent of the earlier published reports
No Hydro Electric Project has been issued concurrenceAppraisal letter by CEA during October 2018
7 Status of Hydro Schemes Cleared by the CEA in Oct-2018
Name of Scheme
File NoCEA-CH-14-1142018-Coordination Division
SN Contents Page
1 Rate of sale of power for the year 2016-17 33-41
RATE OF SALE OF POWER FOR THE YEAR 2016-17
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) NORTHERN REGION
CENTRAL SECTOR
BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 18000 66900 19800
CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 54000 222400 21600
CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 30000 144400 19600
CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 23100 91700 42600
PARBATI - III HPS NHPC LTD HYDRO-HYDRO 52000 68200 54800
DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 28000 95600 30000
CHUTAK NHPC LTD HYDRO-HYDRO 4400 22000 79800
DULHASTI HPS NHPC LTD HYDRO-HYDRO 39000 228000 56400
SALAL HPS NHPC LTD HYDRO-HYDRO 69000 342300 11000
TANAKPUR HPS NHPC LTD HYDRO-HYDRO 9420 43000 29600
URI HPS -I NHPC LTD HYDRO-HYDRO 48000 280300 16000
URI HPS - II NHPC LTD HYDRO-HYDRO 24000 147300 48600
NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 4500 24600 88200
SEWA - II NHPC LTD HYDRO-HYDRO 12000 47100 43400
ANTA CCPP NTPC LTD THERMAL-GASN 41930 67539 32400
AURAIYA CCPP NTPC LTD THERMAL-GASN 66336 53501 39100
BADARPUR TPS NTPC LTD THERMAL-COAL 70500 159153 44800
DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 84000 296170 42300
DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 98000 526686 46300
DADRI CCPP NTPC LTD THERMAL-GASHSD 82978 227469 33000
FARIDABAD CCPP NTPC LTD THERMAL-GASN 43159 115577 30800
RIHAND STPS I NTPC LTD THERMAL-COAL 100000 596766 24500
RIHAND STPS II NTPC LTD THERMAL-COAL 100000 737069 24600
RIHAND STPS III NTPC LTD THERMAL-COAL 100000 706546 30600
SINGRAULI STPS NTPC LTD THERMAL-COAL 200000 1394068 20400
TANDA TPS NTPC LTD THERMAL-COAL 44000 295438 40800
UNCHAHAR TPS I NTPC LTD THERMAL-COAL 42000 256454 39800
UNCHAHAR TPS II NTPC LTD THERMAL-COAL 42000 273577 38900
UNCHAHAR TPS III NTPC LTD THERMAL-COAL 21000 142780 43000
KOLDAM NTPC LTD HYDRO-HYDRO 80000 363260 43600
NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 303575 25841
RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 108000 668677 35374
NJHPS SJVNL HYDRO-HYDRO 150000 699496 23820
RAMPUR HPS SJVNL HYDRO-HYDRO 41202 195982 32260
TEHRI HPP THDC HYDRO-HYDRO 100000 272543 51800
KOTESHWAR HEP THDC HYDRO-HYDRO 40000 106244 53400
IGSTPS JHAJJAR ARAVALI P CPL THERMAL-COAL 150000 510429 49490
NEYVELI BARSINGSAR NEYVELI LIG CORP LTD THERMAL-LIG 25000 127520 38040
STATE SECTOR
PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 21000 14222 48200
PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 21000 19205 48400
PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 25000 102257 42600
PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 25000 62107 41800
DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 60000 312213 41000
RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 120000 35767442200
WYC HYDEL STATION HPGCL HYDRO-HYDRO 6240 20365 24900
GIRI POWER HOUSE HPSEB HYDRO-HYDRO 6000 13958 7600
ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 1695 5467 11900
BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 12000 18528 6700
GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 2250 7462 22500
BASSI POWER HOUSE HPSEB HYDRO-HYDRO 6600 29649 7500
BINWA POWER HOUSE HPSEB HYDRO-HYDRO 600 2749 19300
ANNEXURE-I
RATE OF SALE OF POWER FOR THE YEAR 2016-2017
Page 33
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) GAJ POWER HOUSE HPSEB HYDRO-HYDRO 1050 2914 26700
BANER POWER HOUSE HPSEB HYDRO-HYDRO 1200 2864 16200
HOLI POWER HOUSE HPSEB HYDRO-HYDRO 300 616 22500
THIROT POWER HOUSE HPSEB HYDRO-HYDRO 450 1126 22500
KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 1200 3064 22500
LARJI POWER HOUSE HPSEB HYDRO-HYDRO 12600 53677 23700
NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 250 750 31000
CHABA POWER HOUSE HPSEB HYDRO-HYDRO 175 465 23300
RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 150 101 13400
SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 200 000 22500
KILLAR HPSEB HYDRO-HYDRO 030 050 22500
BHABA AUGUMENP H HPSEB HYDRO-HYDRO 450 1276 22500
BS CHAMBA HPSEB HYDRO-HYDRO 045 099 19500
GUMMA HPSEB HYDRO-HYDRO 300 423 22500
GAS TURBINE POWER STATION IPGCL THERMAL-GAS 27000 67233 39300
PPS-I PPCL THERMAL-GAS 33000 175905 38300
PPS-III PPCL THERMAL-GAS 137120 196879 36100
LOWER JHELUM JampKPDD HYDRO-HYDRO 10500 60214 5100
UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 2260 10514 6300
UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 10500 44202 8500
GANDHARBAL JampKPDD HYDRO-HYDRO 1500 8925 4700
KARNAH MPH JampKPDD HYDRO-HYDRO 200 1122 31000
CHENANI I JampKPDD HYDRO-HYDRO 2330 10892 6600
CHENANI II JampKPDD HYDRO-HYDRO 200 1188 9300
CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 750 3634 14200
IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 375 2108 18500
IGO MERCHELLONG JampKPDD HYDRO-HYDRO 300 1572 29700
PAHALGAM MHP JampKPDD HYDRO-HYDRO 450 1713 32900
MARPACHOO JampKPDD HYDRO-HYDRO 075 375 29800
HAFTAL JampKPDD HYDRO-HYDRO 100 483 28700
SANJAK JampKPDD HYDRO-HYDRO 126 441 36000
SEWA-III JampKPDD HYDRO-HYDRO 900 3273 20200
BHADERWAH JampKPDD HYDRO-HYDRO 150 935 8900
BAZGO JampKPDD HYDRO-HYDRO 030 108 33300
SUMOOR JampKPDD HYDRO-HYDRO 010 045 35400
HUNDER JampKPDD HYDRO-HYDRO 040 176 26200
STAKNA JampKPDD HYDRO-HYDRO 400 1933 4100
KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 124000 662879 31360
SURATGARH TPS RRVUNL THERMAL-COAL 150000 402328 41730
CHHABRA TPS 1amp 2 RRVUNL THERMAL-COAL 50000 305946 36700
CHHABRA TPS 3 RRVUNL THERMAL-COAL 25000 151536 36700
CHHABRA TPS 4 RRVUNL THERMAL-COAL 25000 155896 36700
RAMGARH GT POWER PROJECT RRVUNL THERMAL-COAL 22050 43177 41800
RAMGARH GAS T P PROJECT 3 RRVUNL THERMAL-GAS 5000 93615 41800
DHOLPUR C C POWER PROJECT RRVUNL THERMAL-R-LNG 33000 9486 46110
MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 14000 20855 34192
MINI MICRO HYDEL (MMH) P S RRVUNL HYDRO-HYDRO 2385 851 37800
KALISINDH TPP 1 RRVUNL THERMAL-COAL 60000 341543 45000
KALISINDH TPP 2 RRVUNL THERMAL-COAL 60000 211588 45000
KHARA HEP UPJVNL HYDRO-HYDRO 7200 26654 7200
MATATILLA HEP UPJVNL HYDRO-HYDRO 3060 12219 6500
OBRA HEP UPJVNL HYDRO-HYDRO 9900 21517 6300
RIHAND UPJVNL HYDRO-HYDRO 30000 57369 5500
ANPARA A TPS UPRVUNL THERMAL-COAL 63000 317536 27000
ANPARA B TPS UPRVUNL THERMAL-COAL 100000 705605 22700
ANPARA D UPRVUNL THERMAL-COAL 100000 300158 39800
HARDUAGANJ TPS UPRVUNL THERMAL-COAL 16500 45817 49200
HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 50000 304389 46600
OBRA A TPS UPRVUNL THERMAL-COAL 28800 13158 34000
OBRA B TPS UPRVUNL THERMAL-COAL 100000 328124 21900
Page 34
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) PANKI TPS UPRVUNL THERMAL-COAL 21000 66488 50300
PARICHHA TPS UPRVUNL THERMAL-COAL 22000 38762 49400
PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 42000 231931 45600
PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 50000 276722 50400
CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 24000 70845 8290
CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 14400 75366 8390
DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 3375 9595 12080
DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 5100 18701 10520
KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4140 17359 12330
KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 12000 33001 9420
KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 3000 11953 8320
TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 9000 33983 12460
MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 30400 124510 16110
RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 19800 17897 10550
MPUR UTTARAKHAND JVNL HYDRO-HYDRO 930 5121 19200
PATHRI UTTARAKHAND JVNL HYDRO-HYDRO 2040 11636 14200
GALOGI UTTARAKHAND JVNL HYDRO-HYDRO 300 648 12500
PRIVATE SECTOR
MGTPP CLP INDIA PVT LTD THERMAL-COAL 132000 268902 41940
SHRINAGAR HEP ALAKNANDA HPCL HYDRO-HYDRO 33000 127414 48800
GAMA INFRAPROP CCPP GAMA INFRAPROP PVT THERMAL-GAS 22500 52686 47000
PPGCL (BARA) JP POWER VENTURES LTD THERMAL-COAL 198000 448200 38500
MALANA HEP MALANA PCL HYDRO-HYDRO 8600 26354 29792
MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 10000 30369 32580
ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 19200 56347 36079
KASHANG HEP H P PCL HYDRO-HYDRO 19500 5034 29200
BASPA-II HEP HBPCL HYDRO-HYDRO 30000 132769 13600
KARCHAM WANGTOO HEP HBPCL HYDRO-HYDRO 100000 434386 36600
RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 108000 582600 43700
RITHALA COMBI CY POWER PLANT TATA POWER DDL THERMAL-GAS 9480 000 11900
RAJPURA TPS NABHA POWER LTD THERMAL-GAS 140000 901484 39000
TALWANDI SABO POWER LTD TALWANDI SABO POWER LTD THERMAL-COAL 198000 636040 49548
ROJA THERMAL POWER STATION ROJA POWER SCL THERMAL-COAL 120000 727200 43400
KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 34400 63400
BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 36000 62600
MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 38200 60800
UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 37900 61500
KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 42300 58800
LALITPUR PGCL BAJAJ ENERGY PVT LTD THERMAL-COAL 198000 359400 47300
PRAYAGRAJ PGCL PRAYAGRAJ PGCL THERMAL-COAL 132000 448200 38595
KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 132000 783182 33438
WESTERN REGION
CENTRAL SECTOR
INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 100000 325333 23892
OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 52000 141663 34001
GANDHAR CCPP NTPC LTD THERMAL-GAS 65739 221924 28700
KAWAS CCPP NTPC LTD THERMAL-GASN 65620 167929 27000
KORBA I amp II NTPC LTD THERMAL-COAL 210000 1499171 20500
KORBA III NTPC LTD THERMAL-COAL 50000 358746 26600
SIPAT STPS I NTPC LTD THERMAL-COAL 198000 1479902 26800
SIPAT STPS II NTPC LTD THERMAL-COAL 100000 766549 26500
VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 126000 693142 25800
VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 100000 608781 23800
VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 100000 673475 27600
VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 100000 655924 32900
VINDHYACHAL STPS V NTPC LTD THERMAL-COAL 50000 328265 31700
MOUDA I NTPC LTD THERMAL-COAL 100000 343130 44500
MOUDA Ii NTPC LTD THERMAL-COAL 66000 40637 39900
RATNAGIRI GAS amp POWER PVT LTD RGPPL THERMAL-GAS 196708 442485 47000
KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 000 24729
TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 32000 201227 10740
Page 35
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 365122 19069
TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 787444 29324
STATE SECTOR
GSEG-HAZIRA15610 MW GUJARAT S ENEGEN LTD THERMAL-GAS 15610 1805 28200
GSEG-HAZIRA35143 MW GUJARAT S ENEGEN LTD THERMAL-GAS 35130 22276 51300
GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 21978 51800
AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 13929 26100
KORBA TPS EAST CSPGCL THERMAL-COAL 44000 198673 33880
DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 365808 27570
KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 316500 30420
HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 532878 19410
CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 515 58300
MTTPS CHAMPA U-I CSPGCL THERMAL-COAL 50000 220376 39000
MTTPS CHAMPA U-II CSPGCL THERMAL-COAL 50000 23709 10000
SHP GANGREL CSPGCL HYDRO-HYDRO 1000 2350 36790
BANGO HEP CSPGCL HYDRO-HYDRO 12000 14662 8900
MHP KORBA WEST CSPGCL HYDRO-HYDRO 170 859 38190
SIKASAR HEP CSPGCL HYDRO-HYDRO 700 418 26870
DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8843 74500
DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 19446 51500
GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 66388 71600
GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127488 41300
KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 96072 43900
KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 29841 56400
SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 184966 58800
UKAI 1-5 GSECL THERMAL-COAL 85000 204891 46900
UKAI TPS 6 GSECL THERMAL-COAL 50000 284448 48200
WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 271999 58300
WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 82808 44100
KADANA HPS GSECL HYDRO-HYDRO 24200 34433 16800
UKAI HPS GSECL HYDRO-HYDRO 30500 40585 6100
TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 123000 11500
BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 8900 10900
BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 7200 27500
JHINNA HPS MPPGCL HYDRO-HYDRO 2000 9700 18500
RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 44300 3400
GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 17300 4600
SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 4100 16900
MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 14600 27000
PENCH HPS MPPGCL HYDRO-HYDRO 16000 23700 8100
RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 3000 16900
AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 134400 35100
SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 283800 38700
SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 344600 34300
SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 111600 61600
SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 211800 58000
SSTPS PH-I MPPGCL THERMAL-COAL 120000 233100 84300
BHUSAWAL TPS MSPGCL THERMAL-COAL 142000 566258 51100
CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1365682 33700
KHAPERKHEDA MSPGCL THERMAL-COAL 134000 706207 39100
KORADI TPS MSPGCL THERMAL-COAL 62000 443206 42000
NASIK TPS MSPGCL THERMAL-COAL 63000 297275 47000
PARLI TPS MSPGCL THERMAL-COAL 113000 175934 71600
PARAS MSPGCL THERMAL-COAL 50000 267931 38700
URAN CCPP MSPGCL THERMAL-GAS 67200 320330 30600
KOYANA MSPGCL HYDRO-HYDRO 195600 328155 13100
SMALL HYDRO POWER PLANTS MSPGCL HYDRO-HYDRO 45400 93062 30500
BHIRA MSPGCL HYDRO-HYDRO 8000 10046 8400
TILLARI MSPGCL HYDRO-HYDRO 8900 10584 3100
SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 233298 20500
SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 87633 20500
PRIVATE SECTOR
Page 36
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 81282 46750
JNSTPP(JAYPEE NIGRIE) JP POWER VENTURES LTD THERMAL-COAL 132000 726695 29310
MB POWER MB POWER THERMAL-COAL 120000 345632 38310
ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 754922 28671
ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 780761 23495
ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 198000 1263784 32090
ADANI POWER MAHARA ADANI POWER LTD THERMAL-COAL 330000 1666191 34124
AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 170065 36827
SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 252035 45129
ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 458551 36000
ESSAR POWER MP LTD ESSAR POWER MP LTD THERMAL-COAL 60000 243040 28600
VEDANTA LTD (P P -I) VEDANTA LTD THERMAL-GAS 3000 15044 24000
VEDANTA LTD (P P -II) VEDANTA LTD THERMAL-GAS 3000 21293 24000
PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 8234600 24000
165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 5850 64390
145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 68717 40349
SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 132655 28776
SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 144686 38567
MUNDRA UMPPCOASTAL GUJARAT POWER
LTD THERMAL-IMP COAL 400000 2530300
23900
LANCO AMARKANTAK TPP PATHADIH
U-ILANCO AMARKAN POWER LTD THERMAL-COAL 30000 195500
29200
LANCO AMARKANTAK TPP PATHADIH
U-IILANCO AMARKAN POWER LTD THERMAL-COAL 30000 206900
27600
BARADARHA TPS D B POWER LTD THERMAL-COAL 120000 677373 29200
JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 405000 28900
JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 453000 40500
DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 339437 40700
TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 293400 44000
TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 137200 37000
TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 174900 44000
BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 92900 14100
BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23700 34300
KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 27600 48300
CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2530300 23900
BHANDARDRA HEP -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 2475 54900
SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 161400 26500
SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 445000 39000
SOTHERN REGION
CENTRAL SECTOR
NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 325699 54820
NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 305532 39880
NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 998805 38510
NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 113016 54070
NEYVELI TAMILNADU POWER LTD JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 625274 42200
VALLUR TPS NTPC TECL THERMAL-COAL 150000 856438 42350
R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 1493 84300
RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1502919 29400
RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 341291 31800
SIMHADRI I NTPC LTD THERMAL-COAL 100000 688382 36800
SIMHADRI II NTPC LTD THERMAL-COAL 100000 663657 43400
KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 593110 31324
MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 291625 21764
KKNPP-1 amp 2 NPCIL NUCLEAR-NUCLEAR 200000 572609 40948
MINICOY LAKSHADEEP THERMAL-DIESEL 340 770 29600
KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1097 29600
AMINI LAKSHADEEP THERMAL-DIESEL 265 509 29600
ANDROTT LAKSHADEEP THERMAL-DIESEL 219 524 29600
KALPENI LAKSHADEEP THERMAL-DIESEL 175 356 29600
AGATTI LAKSHADEEP THERMAL-DIESEL 195 658 29600
KADMAT LAKSHADEEP THERMAL-DIESEL 190 414 29600
KILTAN LAKSHADEEP THERMAL-DIESEL 150 269 29600
CHETLET LAKSHADEEP THERMAL-DIESEL 100 139 29600
BITRA LAKSHADEEP THERMAL-DIESEL 043 024 29600
BANGARAM LAKSHADEEP THERMAL-DIESEL 018 009 29600
Page 37
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) STATE SECTOR
Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 721811 46500
Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 50000 336142 46500
RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 237358 46500
RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 239926 46500
RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 124500 46500
SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 62109 46500
UPPER SILERU APGENCO HYDRO-HYDRO 24000 33000 46500
LOWER SILERU APGENCO HYDRO-HYDRO 46000 81066 46500
DONKARAI APGENCO HYDRO-HYDRO 2500 6007 46500
PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 1262 46500
CHETTIPETA APGENCO HYDRO-HYDRO 100 214 46500
MUCHKUND APGENCO HYDRO-HYDRO 12000 37571 46500
NAGARJUNASAGAR RCPH APGENCO HYDRO-HYDRO 9000 606 46500
TUNGABHADRA HES amp HAMPI(AP
Share)
APGENCO HYDRO-HYDRO 7200 6100 46500
KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 352232 42600
KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 288131 32500
KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 319272 46500
RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 40073 44300
KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 308317 46000
KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 308963 51300
SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 61004 76600
NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 17960 75300
PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 20873 58300
POCHAMPAD-I TSPGENCO HYDRO-HYDRO 2700 5455 29800
POCHAMPAD-II TSPGENCO HYDRO-HYDRO 900 1932 40700
NIZAMSAGAR TSPGENCO HYDRO-HYDRO 1000 1126 53400
RAICHUR TPS 1 to 7 KPCL THERMAL-COAL 147000 890866 43800
RAICHUR TPS 8 KPCL THERMAL-COAL 25000 159523 48200
BELLARI TPS 1 KPCL THERMAL-COAL 50000 318679 51100
BELLARI TPS 2 KPCL THERMAL-COAL 50000 232347 55600
BELLARI TPS 3 KPCL THERMAL-COAL 70000 47565 34400
BHADRA PH KPCL HYDRO-HYDRO 3920 2369 45900
GERUSUPPA PH KPCL HYDRO-HYDRO 24000 26990 22000
GHAT PRABHA HEP KPCL HYDRO-HYDRO 3200 4777 25300
KADRA HPS KPCL HYDRO-HYDRO 15000 16889 26800
NAGJHARI KPCL HYDRO-HYDRO 90000 155159 9800
KODASALLI DPH KPCL HYDRO-HYDRO 12000 14854 19200
MUNIRA+MGH+SPH+SPH KPCL HYDRO-HYDRO 22640 48211 7900
SHARAVATHY HPS KPCL HYDRO-HYDRO 108550 276215 5400
ALMATTI DPH KPCL HYDRO-HYDRO 29000 39611 24600
VARAHI UGPH KPCL HYDRO-HYDRO 46000 71368 15600
IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 17196 15300
IDUKKI HPS KSEB HYDRO-HYDRO 78000 137905 15300
KAKKAD HPS KSEB HYDRO-HYDRO 5000 13063 15300
KALLADA HPS KSEB HYDRO-HYDRO 1500 4436 15300
KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 46544 15300
KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 635 15300
LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 30822 15300
MALANKARA HPS KSEB HYDRO-HYDRO 1050 2474 15300
MATTUPETTY KSEB HYDRO-HYDRO 200 230 15300
MALAMPUZHA KSEB HYDRO-HYDRO 250 063 15300
CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 864 15300
URUMI ST I amp II KSEB HYDRO-HYDRO 615 903 15300
LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 248 15300
NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7765 19625 15300
PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 16601 15300
PANNIAR HPS KSEB HYDRO-HYDRO 3240 6217 15300
PORINGALKUTHU KSEB HYDRO-HYDRO 3600 10052 15300
PORINGALKUTHU LBE KSEB HYDRO-HYDRO 1600 9438 15300
PEPPARA KSEB HYDRO-HYDRO 300 395 15300
POOZHITHODE KSEB HYDRO-HYDRO 480 1045 15300
Page 38
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) PEECHI KSEB HYDRO-HYDRO 125 040 15300
RANI-PERUNADU KSEB HYDRO-HYDRO 400 585 15300
SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 79783 15300
SENGULAM HPS KSEB HYDRO-HYDRO 5120 11558 15300
SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 16711 15300
VILANGAD KSEB HYDRO-HYDRO 750 1578 15300
BARAPOLE KSEB HYDRO-HYDRO 1500 1932 15300
VELLATHOOVAL KSEB HYDRO-HYDRO 360 305 15300
CHIM0NY KSEB HYDRO-HYDRO 250 156 15300
ADYANPARA KSEB HYDRO-HYDRO 350 501 15300
BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 554 15300
KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 3801 15300
KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 23132 32800
ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 14416 62280
METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 523970 62280
METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 321270 62280
NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 336575 62280
NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 591240 62280
TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 508966 62280
KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 30897 62280
VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 18720 90699 62280
KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 33593 62280
BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 1047 62280
PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 1250 62280
PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 330 62280
MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 4897 62280
MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 032 62280
KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15681 62280
KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 40608 62280
KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 21342 62280
KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 4717 62280
KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4322 62280
KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2399 62280
METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 4416 62280
METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 8035 62280
BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2187 62280
BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2359 62280
BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2511 62280
BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 1949 62280
BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 1819 62280
POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 172 62280
SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 241 62280
MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 026 62280
THIRUMOORTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 136 62280
PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 9309 62280
VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 353 62280
SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 4192 62280
PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 6571 62280
SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 1186 62280
SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6319 62280
ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 6122 62280
KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 28674 62280
SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 18381 62280
SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 4258 62280
KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 12680 62280
KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4201 62280
ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 000 62280
PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 19175 62280
AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 078 62280
BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 504 62280
BHAVANI KATTALAI (BKB)(IIIampIII BB I amp II)TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 5847 62280
PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 000 62280
Page 39
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) SRI DAMODARAM STPS APPDCL THERMAL-COAL 160000 808108 36300
PRIVATE SECTOR
KARUPPUR TANJORE LANCO TANJORE PCL THERMAL-GAS 12000 48096 28770
SIMHAPURI ENERGY LTD SIMHAPURI ENERGY LTD THERMAL-COAL 60000 143900 39100
JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 7111 45500
SBU 1 JSW ENERGY LTD
VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 26000 159100
43300
SBU 2 JSW ENERGY LTD
VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 60000 247900
42800
LANCO KPLLANCO KONDAPALLI POWER
LTDTHERMAL-GAS 36814 85060
25776
LANCO KPL STG -IILANCO KONDAPALLI POWER
LTDTHERMAL-GAS 36600 12979
46330
LANCO KPL STG -IIIALANCO KONDAPALLI POWER
LTDTHERMAL-GAS 37100 85710
46330
LANCO KPL STG -III BLANCO KONDAPALLI POWER
LTDTHERMAL-GAS 37100 43639
46330
HINDUJA NATIONAL PCL HINDUJA NATIONAL PCL THERMAL-COAL 104000 303000 38200
MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 121164 49940
UDUPI POWER COR LTD ADANI POWER LTD THERMAL-COAL 120000 754613 42500
SPECTRUM POWER GENERATION
LTD SPECTRUM PG LTD THERMAL-GASN 20525 9256812
34952
TAQA NEYVELI POWER COM PVT
LTD TAQA NEYVELI THERMAL-LIG 25000 5840
34500
ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 251000 51000
ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 207860 36800
GMR VEMAGIRI POWER GENERATION
LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 30117
46450
EASTERN REGION
CENTRAL SECTOR
MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 64675 53113
MTPS STAGE - II KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 39000 1432 69138
BOKARO `B` TPS DVC THERMAL-COAL 63000 145670 31539
MEJIA TPS U 1-3 DVC THERMAL-COAL 63000 348298 31552
MEJIA TPS U 4 DVC THERMAL-COAL 21000 116099 34997
MEJIA TPS U 5-6 DVC THERMAL-COAL 50000 276427 35976
MEJIA TPS U 7-8 DVC THERMAL-COAL 100000 552854 36991
DURGAPUR STEEL TPS DVC THERMAL-COAL 100000 665550 39323
DURGAPUR TPS DVC THERMAL-COAL 21000 59270 35416
RAGHUNATHPUR TPS DVC THERMAL-COAL 120000 201650 35326
MAITHON HYDEL STA DVC HYDRO-HYDRO 6320 12200 17984
CHANDRAPURA TPSU1-3 DVC THERMAL-COAL 42000 257610 35095
CHANDRAPURA TPSU7-8 DVC THERMAL-COAL 50000 306673 34987
KODERMA TPS DVC THERMAL-COAL 100000 380180 38131
PANCHET HPS DVC HYDRO-HYDRO 8000 13360 17984
TILLAYA HPS DVC HYDRO-HYDRO 400 1410 17984
RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34700 35400
TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 277300 23200
TLDP -III NHPC LTD HYDRO-HYDRO 13200 55400 62000
TLDP -IV NHPC LTD HYDRO-HYDRO 16000 60300 25600
FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 957219 33700
FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 308943 41000
BONGAINGAON TPS NTPC LTD THERMAL-COAL 25000 153663 58600
KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 542277 34200
KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 942591 34200
BARH-II NTPC LTD THERMAL-COAL 132000 728021 44500
TALCHER TPS NTPC LTD THERMAL-COAL 46000 335521 30100
TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 702319 25600
TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1436521 24700
STATE SECTOR
BTPS(RampM) BIHAR STATE PGCL THERMAL-COAL 22000 12142 39700
BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 98331 10602
HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 50593 9482
CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 19689 2605
RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 53192 6033
UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 147208 14637
Page 40
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 60353 4519
IB TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 288567 25000
J P H GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 210 038 61100
MEYONG CHU GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 400 1086 61100
TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 122667 38200
DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 214339 43321
KOLAGHAT THERMAL POWER
STATION
WEST BENGAL PDCL THERMAL-COAL 126000 538269 31603
BAKRESHWAR THERMAL POWER
PLANT
WEST BENGAL PDCL THERMAL-COAL 105000 634876 32154
BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 45000 166855 33299
SANTHALDIH THERMAL POWER
STATION
WEST BENGAL PDCL THERMAL-COAL 50000 336442 34932
SAGARDIGHI THERMAL POWER
PROJECT
WEST BENGAL PDCL THERMAL-COAL 160000 423121 34705
JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 20344 68900
RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 24559 68900
TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 4623 68900
PURULIA PUMPED STORAGE
PROJECT
WEST BENGAL SEDCL HYDRO-HYDRO 90000 108816 68900
MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2768 68900
PRIVATE SECTOR
CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 49474 20230
CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 555500 70200
HALDIA ENERGY HALDIA ENERGY LTD THERMAL-COAL 60000 371000 50400
DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3688 63400
KAMALANGA TPS GMR KAMALANGA ENERGY LTD THERMAL-COAL 105000547670
33300
ADHUNIK POWER U-1 ADHUNIK POWER THERMAL-COAL 27000 158 44060
ADHUNIK POWER U-2 ADHUNIK POWER THERMAL-COAL 27000 168 44250
VL-JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 332800 23622
JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 43000 45250
JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 71700 37030
JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 70700 35920
JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 71100 38870
JOJOBERA UNIT 5 TATA POWER COM LTD THERMAL-COAL 12000 79300 44560
JOJOBERA UNIT 6 TATA POWER COM LTD THERMAL-WHR 12000 83700 12840
IEL KALINGANAGAR U-I TATA POWER COM LTD THERMAL-WG 6750 33400 22500
IEL KALINGANAGAR U-II TATA POWER COM LTD THERMAL-WG 6750 34800 22500
MAITHON UNIT 1 amp 2 TATA POWER COM LTD THERMAL-COAL 105000 678000 36100
HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 27500 24340
HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 28400 24340
HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 15800 24310
NORTH EASTERN REGION
CENTRAL SECTOR
LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 74100 36600
AGARTALA GT NEEPCO THERMAL-GAS 13500 88611 27210
ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 153111 32310
DOYANG HEP NEEPCO HYDRO-HYDRO 7500 25598 49801
KOPILI HEP NEEPCO HYDRO-HYDRO 20000 98186 11491
KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 19582 20237
KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 10310 17968
RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 124093 22945
TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 10100 17344 39000
STATE SECTOR
HYDRO POWER (122 Stns) ITANAGAR GOVT OF ARUNACHAL
PRADESHHYDRO-HYDRO 6971 6217270
24600
KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39514 17337
LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 82327 36810
NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 33318 48290
MYNTRIANG SHEP ST II ASSAM POWER GENCO HYDRO-HYDRO 300 567 35776
LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 9130 49200
LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 012 49200
DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 022 49200
TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 000 49200
UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 4990 16000
UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 6476 37000
UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 16494 14600
UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 3600 9556 15000
SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 758 8000
MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44070 44800
KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 154 41400
TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 091 41400
MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 411 41400
MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 394 41400
KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 760 41400
SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 3264 41400
LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 044 41400
BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 18953 28000
ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 43585 28200
GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 4080 11100
Note
LIG Lignite N Naptha WHR Waste Heat Recovery
Page 41
File NoCEA-CH-14-1142018-Coordination Division
अकरबर2018 October2018अपरल2018 -अकरबर2018 April2018 to October2018
उततरी कषतर Northern Region
चडीगढ़ Chandigarh Data not received Data not received
दिलली Delhi Data not received Data not received
हरियजणज Haryana 940 hrsday 0709 - 0950 hrsday
दहमजचल परिश Himachal Pradesh No cut imposed on agriculture consumers and uninterrupted
power is being supplied to agriculture sector
HPSEBL has only 2 agriculture consumers and uninterrupted
power is being supplied to agriculture sector
रमम कशमीि Jammu amp Kashmir Data not received Data not received
परजब Punjab 0507 hrsday 0349 - 0844 hrsday
िजरसथजन Rajasthan 0630 hrsday 0630 hrsday
उतति परिश Uttar Pradesh 1825 hrsday 1814 - 1858 hrsday
उततिजखड Uttarakhand 2350 hrsday 2128 - 2357 hrsday
पशचिमी कषतर Western Region
छततीसगढ़ Chhattisgarh 18hoursday 18 hrsday
गरिजत Gujarat 805 hrsday 805 hrsday
मधय परिश Madhya Pradesh Three-Phase Supply(Irrigation)-947 hrs day
Three-Phase (Mixed) Supply - 2311 hrs day
Three-Phase Supply(Irrigation)- 0933 - 0947 hrs day Three-
Phase (Mixed) Supply - 2300 - 2320 hrs day
महजिजषटर Maharashtra Three-Phase Supply(Irrigation)- 9 hrs day
Three-Phase (Mixed) Supply - 24 hrs day
Three-Phase Supply(Irrigation)- 9 hrs day
Three-Phase (Mixed) Supply - 24 hrs day
गोवज Goa No restriction No restriction
दकषकषणी कषतर Southern Region
आनधर परिश Andhra Pradesh 07 hrsday 07 hrsday
तलगजनज Telangana 24 hoursday 24 hoursday
कनजाटक Karnataka 6 hrsday 6 hrsday
किल Kerala No Restrictions No Restrictions
तममल नजड Tamil Nadu 9 hrsday (6 hrs during day time and 3 hrs during night time) 9 hrsday (6 hrs during day time and 3 hrs during night time)
पडचिी Puducherry No Restrictions No Restrictions
परवी कषतर Eastern Region
बबहजि Bihar About 18 hrsday About 18 hrsday
झजिखणड Jharkhand About 20 hrsday About 20 hrsday
ओडडशज Odisha 24 hrsday 24 hrsday
पशशचम बगजल West Bengal About 23 hrsday About 23 hrsday
28
अकटबर 2018 कषि कषतर को षिदयत आपरति का षििरण Power Supply to Agricultural Sector during October2018
राजय कषतर State Regionऔसत वरवदयत आपरतण घनरो म Average Hours of Supply
On segregated feeders
File NoCEA-CH-14-1142018-Coordination Division
SNo Contents Page
1 Growth of Installed Capacity since 6th Plan 29
2 Progress of Transmission Sector since 6th Plan 30
3 All India Yearly Coal consumption for Power Generation (Utilities)
4 All India Annual Per Capita Consumption of Electricity since -2006
5 Average cost of power supply amp Average realisation (Paisakwh)
6 Growth of Rural Electrification amp Pump Sets Energisation
7 Status of Hydro Schemes Cleared by the CEA in Oct-2018
Section G - Growth of Power Sector
31
32
File NoCEA-CH-14-1142018-Coordination Division
(In MW)
Coal Gas Diesel Total
End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472
End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634
End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537
End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596
End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921
End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703
End of 12th Plan 19216288 2532938 83763 21832988 6780 4447842 50018 31960630
Up to Oct-2018 19599250 2493722 837629 22176734 6780 4548742 7201281 34604757
Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-17) = 51529 MW
Electricity Generation (MU) Targets and Achievements for 2016-17
Coal Gas Diesel Nuclear Hydro Res Total
1959925 2493722 837629 678000 454874 72012805 22925174
29
1 Growth of Installed Capacity Since 6th Plan
Plan YearThermal
Nuclear Hydro RES (MNRE) Total
Total Installed Capacity 34604757 MW
Coal Gas Diesel Nuclear Hydro Res
File NoCEA-CH-14-1142018-Coordination Division
Progress of Transmission Sector in the Country up to Oct 2018
1 TRANSMISSION LINES (All fig in CKM)
At the end of
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
6th plan 0 0 0 0 0 0 0 0 0 0 0 0 1831 4198 0 6029 1641 44364 0 46005 3472 48562 0 52034
7th plan 0 0 0 0 0 0 0 0 0 0 0 0 13068 6756 0 19824 4560 55071 0 59631 17628 61827 0 79455
8th plan 0 0 0 0 1634 0 0 1634 0 0 0 0 23001 13141 0 36142 6564 73036 0 79600 31199 86177 0 117376
9th plan 0 0 0 0 3234 1504 0 4738 751 409 0 1160 29345 20033 0 49378 8687 88306 0 96993 42017 110252 0 152269
10th plan 0 0 0 0 4368 1504 0 5872 1775 409 0 2184 48708 24730 0 73438 9444 105185 0 114629 64295 131828 0 196123
11th Plan 0 0 0 0 5948 1504 1980 9432 4839 411 0 5250 71023 30191 5605 106819 10140 125010 830 135980 91950 157116 8415 257481
12th Plan 6124 0 0 6124 5948 1504 1980 9432 25465 1177 4598 31240 92482 48240 17065 157787 11014 151276 978 163268 141033 202197 24621 367851
13th Plan (Up
to Mar2018)6124 0 0 6124 5948 1504 1980 9432 28666 1512 4881 35059 98247 54286 19067 171600 11258 156497 1000 168755 150243 213799 26928 390970
13th Plan (Up
to Sep-18)6124 0 0 6124 5948 1504 1980 9432 30952 1512 5059 37523 99683 56069 20662 176414 11318 160958 1000 173276 154025 220043 28701 402769
27150
75050
47900
118050
90650
30
IR addition in 12th Plan (up to
March 2017)
Total IR (up to Oct-18)
IR at the end of 11th Plan
IR at the end of 12th Plan
Envisaged IR Capacity at the end
of 13th Plan
Grand Total
Note - The figure upto the end of 10th plan in for stringing progress including the lines not commissioned Now only commissioned lines are reckoned Accordingly the figure for 10th plan (end) may read as 187555 after adjusting with (-) 10852 Ckm
Inter-regional Power Transfer Capacity
plusmn 800 kV HVDC plusmn 500 kV HVDC 765 kV 400 kV 220 kV
File NoCEA-CH-14-1142018-Coordination Division
2004-05 27800
2005-06 28100
2006-07 30200
2007-08 33000
2008-09 35500
2009-10 36700
2010-11 38700
2011-12 41756
2012-13 45460
2013-14 48940
2014-15 53040
2015-16 54590
2016-17 57430
2017-18 60800
Year
2005-06
2006-07
2007-08
2008-09
2009-10
2010-11
2011-12
2012-13
2013-14
2014-15
2015-16
2016-17
2017-18
2004-05 254 209 7568
2005-06 260 221 7636
2006-07 276 227 7423
2007-08 293 239 7727
2008-09 340 263 8713
2009-10 355 268 8870
2010-11 398 303 11975
2011-12 455 330 13514
2012-13 501 376 14867
2013-14 518 175
2014-15 520
6719
7171
3 All India yearly Coal Consumption for Power Generation (Utilities)
YEARCoal Consumption
Million Tonnes
4 All India Annual per Capita consumption of Electricity Since 2006
Per Capita Consumption ( kWh)
6314
(GrossGen+ Net Import) Mid-year population
5 Average cost of power supply amp average realization ( paiseKWH )
Yearcost of supply
(paiseunit)
Realization(paiseunit)
Including AgricultureOnly
Agriculture
1149
7335
7786
91441
8188
88363
957
1010
1075
1122
File NoCEA-CH-14-1142018-Coordination Division
Source- PFC Reports on the performance of State Power Utilities 31
File NoCEA-CH-14-1142018-Coordination Division
Sl
NoExecuting Agency
Installed
Capacity (MW)Cost (Rs crore)
Date of
Clearance
32
No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification
since 2004-05
65291374575 296361511th Plan
Cumu upto End of 11th Plan
596556 21212860
557439Cummulative up to end of 12th Plan
46708
18423975
499150
2003-042004-05
5743
9769
Cumu upto End of 10th Plan
010407 to 310308
010410 to 310311557976840909
010411 to 310312
412667
86293726
3207
482864
12632
1576036
4451722594
15455554
2314176
397343611750
2093311060316074
65109527813884
6 Growth Of Rural Electrification amp Pumpsets Energisation
Plan Year
9th Plan2002-03
134092626
4111
Pump Sets Energised Villages Electricfied (Nos)
2001-02
284064367244
1218
27801997-981998-991999-002000-01
297594
010408 to 310309010409 to 310310
10th Plan
2005-062006-07
322968331020
Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as
Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received
from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made
available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified
villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is
independent of the earlier published reports
No Hydro Electric Project has been issued concurrenceAppraisal letter by CEA during October 2018
7 Status of Hydro Schemes Cleared by the CEA in Oct-2018
Name of Scheme
File NoCEA-CH-14-1142018-Coordination Division
SN Contents Page
1 Rate of sale of power for the year 2016-17 33-41
RATE OF SALE OF POWER FOR THE YEAR 2016-17
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) NORTHERN REGION
CENTRAL SECTOR
BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 18000 66900 19800
CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 54000 222400 21600
CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 30000 144400 19600
CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 23100 91700 42600
PARBATI - III HPS NHPC LTD HYDRO-HYDRO 52000 68200 54800
DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 28000 95600 30000
CHUTAK NHPC LTD HYDRO-HYDRO 4400 22000 79800
DULHASTI HPS NHPC LTD HYDRO-HYDRO 39000 228000 56400
SALAL HPS NHPC LTD HYDRO-HYDRO 69000 342300 11000
TANAKPUR HPS NHPC LTD HYDRO-HYDRO 9420 43000 29600
URI HPS -I NHPC LTD HYDRO-HYDRO 48000 280300 16000
URI HPS - II NHPC LTD HYDRO-HYDRO 24000 147300 48600
NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 4500 24600 88200
SEWA - II NHPC LTD HYDRO-HYDRO 12000 47100 43400
ANTA CCPP NTPC LTD THERMAL-GASN 41930 67539 32400
AURAIYA CCPP NTPC LTD THERMAL-GASN 66336 53501 39100
BADARPUR TPS NTPC LTD THERMAL-COAL 70500 159153 44800
DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 84000 296170 42300
DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 98000 526686 46300
DADRI CCPP NTPC LTD THERMAL-GASHSD 82978 227469 33000
FARIDABAD CCPP NTPC LTD THERMAL-GASN 43159 115577 30800
RIHAND STPS I NTPC LTD THERMAL-COAL 100000 596766 24500
RIHAND STPS II NTPC LTD THERMAL-COAL 100000 737069 24600
RIHAND STPS III NTPC LTD THERMAL-COAL 100000 706546 30600
SINGRAULI STPS NTPC LTD THERMAL-COAL 200000 1394068 20400
TANDA TPS NTPC LTD THERMAL-COAL 44000 295438 40800
UNCHAHAR TPS I NTPC LTD THERMAL-COAL 42000 256454 39800
UNCHAHAR TPS II NTPC LTD THERMAL-COAL 42000 273577 38900
UNCHAHAR TPS III NTPC LTD THERMAL-COAL 21000 142780 43000
KOLDAM NTPC LTD HYDRO-HYDRO 80000 363260 43600
NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 303575 25841
RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 108000 668677 35374
NJHPS SJVNL HYDRO-HYDRO 150000 699496 23820
RAMPUR HPS SJVNL HYDRO-HYDRO 41202 195982 32260
TEHRI HPP THDC HYDRO-HYDRO 100000 272543 51800
KOTESHWAR HEP THDC HYDRO-HYDRO 40000 106244 53400
IGSTPS JHAJJAR ARAVALI P CPL THERMAL-COAL 150000 510429 49490
NEYVELI BARSINGSAR NEYVELI LIG CORP LTD THERMAL-LIG 25000 127520 38040
STATE SECTOR
PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 21000 14222 48200
PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 21000 19205 48400
PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 25000 102257 42600
PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 25000 62107 41800
DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 60000 312213 41000
RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 120000 35767442200
WYC HYDEL STATION HPGCL HYDRO-HYDRO 6240 20365 24900
GIRI POWER HOUSE HPSEB HYDRO-HYDRO 6000 13958 7600
ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 1695 5467 11900
BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 12000 18528 6700
GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 2250 7462 22500
BASSI POWER HOUSE HPSEB HYDRO-HYDRO 6600 29649 7500
BINWA POWER HOUSE HPSEB HYDRO-HYDRO 600 2749 19300
ANNEXURE-I
RATE OF SALE OF POWER FOR THE YEAR 2016-2017
Page 33
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) GAJ POWER HOUSE HPSEB HYDRO-HYDRO 1050 2914 26700
BANER POWER HOUSE HPSEB HYDRO-HYDRO 1200 2864 16200
HOLI POWER HOUSE HPSEB HYDRO-HYDRO 300 616 22500
THIROT POWER HOUSE HPSEB HYDRO-HYDRO 450 1126 22500
KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 1200 3064 22500
LARJI POWER HOUSE HPSEB HYDRO-HYDRO 12600 53677 23700
NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 250 750 31000
CHABA POWER HOUSE HPSEB HYDRO-HYDRO 175 465 23300
RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 150 101 13400
SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 200 000 22500
KILLAR HPSEB HYDRO-HYDRO 030 050 22500
BHABA AUGUMENP H HPSEB HYDRO-HYDRO 450 1276 22500
BS CHAMBA HPSEB HYDRO-HYDRO 045 099 19500
GUMMA HPSEB HYDRO-HYDRO 300 423 22500
GAS TURBINE POWER STATION IPGCL THERMAL-GAS 27000 67233 39300
PPS-I PPCL THERMAL-GAS 33000 175905 38300
PPS-III PPCL THERMAL-GAS 137120 196879 36100
LOWER JHELUM JampKPDD HYDRO-HYDRO 10500 60214 5100
UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 2260 10514 6300
UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 10500 44202 8500
GANDHARBAL JampKPDD HYDRO-HYDRO 1500 8925 4700
KARNAH MPH JampKPDD HYDRO-HYDRO 200 1122 31000
CHENANI I JampKPDD HYDRO-HYDRO 2330 10892 6600
CHENANI II JampKPDD HYDRO-HYDRO 200 1188 9300
CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 750 3634 14200
IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 375 2108 18500
IGO MERCHELLONG JampKPDD HYDRO-HYDRO 300 1572 29700
PAHALGAM MHP JampKPDD HYDRO-HYDRO 450 1713 32900
MARPACHOO JampKPDD HYDRO-HYDRO 075 375 29800
HAFTAL JampKPDD HYDRO-HYDRO 100 483 28700
SANJAK JampKPDD HYDRO-HYDRO 126 441 36000
SEWA-III JampKPDD HYDRO-HYDRO 900 3273 20200
BHADERWAH JampKPDD HYDRO-HYDRO 150 935 8900
BAZGO JampKPDD HYDRO-HYDRO 030 108 33300
SUMOOR JampKPDD HYDRO-HYDRO 010 045 35400
HUNDER JampKPDD HYDRO-HYDRO 040 176 26200
STAKNA JampKPDD HYDRO-HYDRO 400 1933 4100
KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 124000 662879 31360
SURATGARH TPS RRVUNL THERMAL-COAL 150000 402328 41730
CHHABRA TPS 1amp 2 RRVUNL THERMAL-COAL 50000 305946 36700
CHHABRA TPS 3 RRVUNL THERMAL-COAL 25000 151536 36700
CHHABRA TPS 4 RRVUNL THERMAL-COAL 25000 155896 36700
RAMGARH GT POWER PROJECT RRVUNL THERMAL-COAL 22050 43177 41800
RAMGARH GAS T P PROJECT 3 RRVUNL THERMAL-GAS 5000 93615 41800
DHOLPUR C C POWER PROJECT RRVUNL THERMAL-R-LNG 33000 9486 46110
MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 14000 20855 34192
MINI MICRO HYDEL (MMH) P S RRVUNL HYDRO-HYDRO 2385 851 37800
KALISINDH TPP 1 RRVUNL THERMAL-COAL 60000 341543 45000
KALISINDH TPP 2 RRVUNL THERMAL-COAL 60000 211588 45000
KHARA HEP UPJVNL HYDRO-HYDRO 7200 26654 7200
MATATILLA HEP UPJVNL HYDRO-HYDRO 3060 12219 6500
OBRA HEP UPJVNL HYDRO-HYDRO 9900 21517 6300
RIHAND UPJVNL HYDRO-HYDRO 30000 57369 5500
ANPARA A TPS UPRVUNL THERMAL-COAL 63000 317536 27000
ANPARA B TPS UPRVUNL THERMAL-COAL 100000 705605 22700
ANPARA D UPRVUNL THERMAL-COAL 100000 300158 39800
HARDUAGANJ TPS UPRVUNL THERMAL-COAL 16500 45817 49200
HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 50000 304389 46600
OBRA A TPS UPRVUNL THERMAL-COAL 28800 13158 34000
OBRA B TPS UPRVUNL THERMAL-COAL 100000 328124 21900
Page 34
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) PANKI TPS UPRVUNL THERMAL-COAL 21000 66488 50300
PARICHHA TPS UPRVUNL THERMAL-COAL 22000 38762 49400
PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 42000 231931 45600
PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 50000 276722 50400
CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 24000 70845 8290
CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 14400 75366 8390
DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 3375 9595 12080
DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 5100 18701 10520
KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4140 17359 12330
KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 12000 33001 9420
KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 3000 11953 8320
TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 9000 33983 12460
MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 30400 124510 16110
RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 19800 17897 10550
MPUR UTTARAKHAND JVNL HYDRO-HYDRO 930 5121 19200
PATHRI UTTARAKHAND JVNL HYDRO-HYDRO 2040 11636 14200
GALOGI UTTARAKHAND JVNL HYDRO-HYDRO 300 648 12500
PRIVATE SECTOR
MGTPP CLP INDIA PVT LTD THERMAL-COAL 132000 268902 41940
SHRINAGAR HEP ALAKNANDA HPCL HYDRO-HYDRO 33000 127414 48800
GAMA INFRAPROP CCPP GAMA INFRAPROP PVT THERMAL-GAS 22500 52686 47000
PPGCL (BARA) JP POWER VENTURES LTD THERMAL-COAL 198000 448200 38500
MALANA HEP MALANA PCL HYDRO-HYDRO 8600 26354 29792
MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 10000 30369 32580
ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 19200 56347 36079
KASHANG HEP H P PCL HYDRO-HYDRO 19500 5034 29200
BASPA-II HEP HBPCL HYDRO-HYDRO 30000 132769 13600
KARCHAM WANGTOO HEP HBPCL HYDRO-HYDRO 100000 434386 36600
RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 108000 582600 43700
RITHALA COMBI CY POWER PLANT TATA POWER DDL THERMAL-GAS 9480 000 11900
RAJPURA TPS NABHA POWER LTD THERMAL-GAS 140000 901484 39000
TALWANDI SABO POWER LTD TALWANDI SABO POWER LTD THERMAL-COAL 198000 636040 49548
ROJA THERMAL POWER STATION ROJA POWER SCL THERMAL-COAL 120000 727200 43400
KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 34400 63400
BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 36000 62600
MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 38200 60800
UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 37900 61500
KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 42300 58800
LALITPUR PGCL BAJAJ ENERGY PVT LTD THERMAL-COAL 198000 359400 47300
PRAYAGRAJ PGCL PRAYAGRAJ PGCL THERMAL-COAL 132000 448200 38595
KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 132000 783182 33438
WESTERN REGION
CENTRAL SECTOR
INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 100000 325333 23892
OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 52000 141663 34001
GANDHAR CCPP NTPC LTD THERMAL-GAS 65739 221924 28700
KAWAS CCPP NTPC LTD THERMAL-GASN 65620 167929 27000
KORBA I amp II NTPC LTD THERMAL-COAL 210000 1499171 20500
KORBA III NTPC LTD THERMAL-COAL 50000 358746 26600
SIPAT STPS I NTPC LTD THERMAL-COAL 198000 1479902 26800
SIPAT STPS II NTPC LTD THERMAL-COAL 100000 766549 26500
VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 126000 693142 25800
VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 100000 608781 23800
VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 100000 673475 27600
VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 100000 655924 32900
VINDHYACHAL STPS V NTPC LTD THERMAL-COAL 50000 328265 31700
MOUDA I NTPC LTD THERMAL-COAL 100000 343130 44500
MOUDA Ii NTPC LTD THERMAL-COAL 66000 40637 39900
RATNAGIRI GAS amp POWER PVT LTD RGPPL THERMAL-GAS 196708 442485 47000
KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 000 24729
TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 32000 201227 10740
Page 35
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 365122 19069
TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 787444 29324
STATE SECTOR
GSEG-HAZIRA15610 MW GUJARAT S ENEGEN LTD THERMAL-GAS 15610 1805 28200
GSEG-HAZIRA35143 MW GUJARAT S ENEGEN LTD THERMAL-GAS 35130 22276 51300
GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 21978 51800
AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 13929 26100
KORBA TPS EAST CSPGCL THERMAL-COAL 44000 198673 33880
DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 365808 27570
KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 316500 30420
HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 532878 19410
CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 515 58300
MTTPS CHAMPA U-I CSPGCL THERMAL-COAL 50000 220376 39000
MTTPS CHAMPA U-II CSPGCL THERMAL-COAL 50000 23709 10000
SHP GANGREL CSPGCL HYDRO-HYDRO 1000 2350 36790
BANGO HEP CSPGCL HYDRO-HYDRO 12000 14662 8900
MHP KORBA WEST CSPGCL HYDRO-HYDRO 170 859 38190
SIKASAR HEP CSPGCL HYDRO-HYDRO 700 418 26870
DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8843 74500
DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 19446 51500
GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 66388 71600
GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127488 41300
KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 96072 43900
KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 29841 56400
SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 184966 58800
UKAI 1-5 GSECL THERMAL-COAL 85000 204891 46900
UKAI TPS 6 GSECL THERMAL-COAL 50000 284448 48200
WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 271999 58300
WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 82808 44100
KADANA HPS GSECL HYDRO-HYDRO 24200 34433 16800
UKAI HPS GSECL HYDRO-HYDRO 30500 40585 6100
TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 123000 11500
BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 8900 10900
BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 7200 27500
JHINNA HPS MPPGCL HYDRO-HYDRO 2000 9700 18500
RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 44300 3400
GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 17300 4600
SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 4100 16900
MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 14600 27000
PENCH HPS MPPGCL HYDRO-HYDRO 16000 23700 8100
RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 3000 16900
AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 134400 35100
SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 283800 38700
SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 344600 34300
SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 111600 61600
SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 211800 58000
SSTPS PH-I MPPGCL THERMAL-COAL 120000 233100 84300
BHUSAWAL TPS MSPGCL THERMAL-COAL 142000 566258 51100
CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1365682 33700
KHAPERKHEDA MSPGCL THERMAL-COAL 134000 706207 39100
KORADI TPS MSPGCL THERMAL-COAL 62000 443206 42000
NASIK TPS MSPGCL THERMAL-COAL 63000 297275 47000
PARLI TPS MSPGCL THERMAL-COAL 113000 175934 71600
PARAS MSPGCL THERMAL-COAL 50000 267931 38700
URAN CCPP MSPGCL THERMAL-GAS 67200 320330 30600
KOYANA MSPGCL HYDRO-HYDRO 195600 328155 13100
SMALL HYDRO POWER PLANTS MSPGCL HYDRO-HYDRO 45400 93062 30500
BHIRA MSPGCL HYDRO-HYDRO 8000 10046 8400
TILLARI MSPGCL HYDRO-HYDRO 8900 10584 3100
SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 233298 20500
SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 87633 20500
PRIVATE SECTOR
Page 36
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 81282 46750
JNSTPP(JAYPEE NIGRIE) JP POWER VENTURES LTD THERMAL-COAL 132000 726695 29310
MB POWER MB POWER THERMAL-COAL 120000 345632 38310
ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 754922 28671
ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 780761 23495
ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 198000 1263784 32090
ADANI POWER MAHARA ADANI POWER LTD THERMAL-COAL 330000 1666191 34124
AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 170065 36827
SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 252035 45129
ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 458551 36000
ESSAR POWER MP LTD ESSAR POWER MP LTD THERMAL-COAL 60000 243040 28600
VEDANTA LTD (P P -I) VEDANTA LTD THERMAL-GAS 3000 15044 24000
VEDANTA LTD (P P -II) VEDANTA LTD THERMAL-GAS 3000 21293 24000
PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 8234600 24000
165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 5850 64390
145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 68717 40349
SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 132655 28776
SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 144686 38567
MUNDRA UMPPCOASTAL GUJARAT POWER
LTD THERMAL-IMP COAL 400000 2530300
23900
LANCO AMARKANTAK TPP PATHADIH
U-ILANCO AMARKAN POWER LTD THERMAL-COAL 30000 195500
29200
LANCO AMARKANTAK TPP PATHADIH
U-IILANCO AMARKAN POWER LTD THERMAL-COAL 30000 206900
27600
BARADARHA TPS D B POWER LTD THERMAL-COAL 120000 677373 29200
JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 405000 28900
JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 453000 40500
DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 339437 40700
TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 293400 44000
TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 137200 37000
TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 174900 44000
BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 92900 14100
BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23700 34300
KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 27600 48300
CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2530300 23900
BHANDARDRA HEP -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 2475 54900
SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 161400 26500
SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 445000 39000
SOTHERN REGION
CENTRAL SECTOR
NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 325699 54820
NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 305532 39880
NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 998805 38510
NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 113016 54070
NEYVELI TAMILNADU POWER LTD JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 625274 42200
VALLUR TPS NTPC TECL THERMAL-COAL 150000 856438 42350
R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 1493 84300
RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1502919 29400
RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 341291 31800
SIMHADRI I NTPC LTD THERMAL-COAL 100000 688382 36800
SIMHADRI II NTPC LTD THERMAL-COAL 100000 663657 43400
KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 593110 31324
MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 291625 21764
KKNPP-1 amp 2 NPCIL NUCLEAR-NUCLEAR 200000 572609 40948
MINICOY LAKSHADEEP THERMAL-DIESEL 340 770 29600
KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1097 29600
AMINI LAKSHADEEP THERMAL-DIESEL 265 509 29600
ANDROTT LAKSHADEEP THERMAL-DIESEL 219 524 29600
KALPENI LAKSHADEEP THERMAL-DIESEL 175 356 29600
AGATTI LAKSHADEEP THERMAL-DIESEL 195 658 29600
KADMAT LAKSHADEEP THERMAL-DIESEL 190 414 29600
KILTAN LAKSHADEEP THERMAL-DIESEL 150 269 29600
CHETLET LAKSHADEEP THERMAL-DIESEL 100 139 29600
BITRA LAKSHADEEP THERMAL-DIESEL 043 024 29600
BANGARAM LAKSHADEEP THERMAL-DIESEL 018 009 29600
Page 37
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) STATE SECTOR
Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 721811 46500
Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 50000 336142 46500
RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 237358 46500
RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 239926 46500
RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 124500 46500
SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 62109 46500
UPPER SILERU APGENCO HYDRO-HYDRO 24000 33000 46500
LOWER SILERU APGENCO HYDRO-HYDRO 46000 81066 46500
DONKARAI APGENCO HYDRO-HYDRO 2500 6007 46500
PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 1262 46500
CHETTIPETA APGENCO HYDRO-HYDRO 100 214 46500
MUCHKUND APGENCO HYDRO-HYDRO 12000 37571 46500
NAGARJUNASAGAR RCPH APGENCO HYDRO-HYDRO 9000 606 46500
TUNGABHADRA HES amp HAMPI(AP
Share)
APGENCO HYDRO-HYDRO 7200 6100 46500
KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 352232 42600
KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 288131 32500
KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 319272 46500
RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 40073 44300
KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 308317 46000
KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 308963 51300
SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 61004 76600
NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 17960 75300
PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 20873 58300
POCHAMPAD-I TSPGENCO HYDRO-HYDRO 2700 5455 29800
POCHAMPAD-II TSPGENCO HYDRO-HYDRO 900 1932 40700
NIZAMSAGAR TSPGENCO HYDRO-HYDRO 1000 1126 53400
RAICHUR TPS 1 to 7 KPCL THERMAL-COAL 147000 890866 43800
RAICHUR TPS 8 KPCL THERMAL-COAL 25000 159523 48200
BELLARI TPS 1 KPCL THERMAL-COAL 50000 318679 51100
BELLARI TPS 2 KPCL THERMAL-COAL 50000 232347 55600
BELLARI TPS 3 KPCL THERMAL-COAL 70000 47565 34400
BHADRA PH KPCL HYDRO-HYDRO 3920 2369 45900
GERUSUPPA PH KPCL HYDRO-HYDRO 24000 26990 22000
GHAT PRABHA HEP KPCL HYDRO-HYDRO 3200 4777 25300
KADRA HPS KPCL HYDRO-HYDRO 15000 16889 26800
NAGJHARI KPCL HYDRO-HYDRO 90000 155159 9800
KODASALLI DPH KPCL HYDRO-HYDRO 12000 14854 19200
MUNIRA+MGH+SPH+SPH KPCL HYDRO-HYDRO 22640 48211 7900
SHARAVATHY HPS KPCL HYDRO-HYDRO 108550 276215 5400
ALMATTI DPH KPCL HYDRO-HYDRO 29000 39611 24600
VARAHI UGPH KPCL HYDRO-HYDRO 46000 71368 15600
IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 17196 15300
IDUKKI HPS KSEB HYDRO-HYDRO 78000 137905 15300
KAKKAD HPS KSEB HYDRO-HYDRO 5000 13063 15300
KALLADA HPS KSEB HYDRO-HYDRO 1500 4436 15300
KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 46544 15300
KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 635 15300
LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 30822 15300
MALANKARA HPS KSEB HYDRO-HYDRO 1050 2474 15300
MATTUPETTY KSEB HYDRO-HYDRO 200 230 15300
MALAMPUZHA KSEB HYDRO-HYDRO 250 063 15300
CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 864 15300
URUMI ST I amp II KSEB HYDRO-HYDRO 615 903 15300
LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 248 15300
NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7765 19625 15300
PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 16601 15300
PANNIAR HPS KSEB HYDRO-HYDRO 3240 6217 15300
PORINGALKUTHU KSEB HYDRO-HYDRO 3600 10052 15300
PORINGALKUTHU LBE KSEB HYDRO-HYDRO 1600 9438 15300
PEPPARA KSEB HYDRO-HYDRO 300 395 15300
POOZHITHODE KSEB HYDRO-HYDRO 480 1045 15300
Page 38
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) PEECHI KSEB HYDRO-HYDRO 125 040 15300
RANI-PERUNADU KSEB HYDRO-HYDRO 400 585 15300
SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 79783 15300
SENGULAM HPS KSEB HYDRO-HYDRO 5120 11558 15300
SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 16711 15300
VILANGAD KSEB HYDRO-HYDRO 750 1578 15300
BARAPOLE KSEB HYDRO-HYDRO 1500 1932 15300
VELLATHOOVAL KSEB HYDRO-HYDRO 360 305 15300
CHIM0NY KSEB HYDRO-HYDRO 250 156 15300
ADYANPARA KSEB HYDRO-HYDRO 350 501 15300
BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 554 15300
KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 3801 15300
KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 23132 32800
ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 14416 62280
METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 523970 62280
METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 321270 62280
NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 336575 62280
NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 591240 62280
TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 508966 62280
KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 30897 62280
VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 18720 90699 62280
KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 33593 62280
BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 1047 62280
PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 1250 62280
PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 330 62280
MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 4897 62280
MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 032 62280
KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15681 62280
KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 40608 62280
KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 21342 62280
KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 4717 62280
KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4322 62280
KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2399 62280
METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 4416 62280
METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 8035 62280
BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2187 62280
BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2359 62280
BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2511 62280
BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 1949 62280
BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 1819 62280
POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 172 62280
SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 241 62280
MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 026 62280
THIRUMOORTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 136 62280
PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 9309 62280
VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 353 62280
SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 4192 62280
PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 6571 62280
SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 1186 62280
SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6319 62280
ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 6122 62280
KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 28674 62280
SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 18381 62280
SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 4258 62280
KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 12680 62280
KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4201 62280
ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 000 62280
PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 19175 62280
AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 078 62280
BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 504 62280
BHAVANI KATTALAI (BKB)(IIIampIII BB I amp II)TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 5847 62280
PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 000 62280
Page 39
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) SRI DAMODARAM STPS APPDCL THERMAL-COAL 160000 808108 36300
PRIVATE SECTOR
KARUPPUR TANJORE LANCO TANJORE PCL THERMAL-GAS 12000 48096 28770
SIMHAPURI ENERGY LTD SIMHAPURI ENERGY LTD THERMAL-COAL 60000 143900 39100
JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 7111 45500
SBU 1 JSW ENERGY LTD
VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 26000 159100
43300
SBU 2 JSW ENERGY LTD
VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 60000 247900
42800
LANCO KPLLANCO KONDAPALLI POWER
LTDTHERMAL-GAS 36814 85060
25776
LANCO KPL STG -IILANCO KONDAPALLI POWER
LTDTHERMAL-GAS 36600 12979
46330
LANCO KPL STG -IIIALANCO KONDAPALLI POWER
LTDTHERMAL-GAS 37100 85710
46330
LANCO KPL STG -III BLANCO KONDAPALLI POWER
LTDTHERMAL-GAS 37100 43639
46330
HINDUJA NATIONAL PCL HINDUJA NATIONAL PCL THERMAL-COAL 104000 303000 38200
MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 121164 49940
UDUPI POWER COR LTD ADANI POWER LTD THERMAL-COAL 120000 754613 42500
SPECTRUM POWER GENERATION
LTD SPECTRUM PG LTD THERMAL-GASN 20525 9256812
34952
TAQA NEYVELI POWER COM PVT
LTD TAQA NEYVELI THERMAL-LIG 25000 5840
34500
ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 251000 51000
ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 207860 36800
GMR VEMAGIRI POWER GENERATION
LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 30117
46450
EASTERN REGION
CENTRAL SECTOR
MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 64675 53113
MTPS STAGE - II KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 39000 1432 69138
BOKARO `B` TPS DVC THERMAL-COAL 63000 145670 31539
MEJIA TPS U 1-3 DVC THERMAL-COAL 63000 348298 31552
MEJIA TPS U 4 DVC THERMAL-COAL 21000 116099 34997
MEJIA TPS U 5-6 DVC THERMAL-COAL 50000 276427 35976
MEJIA TPS U 7-8 DVC THERMAL-COAL 100000 552854 36991
DURGAPUR STEEL TPS DVC THERMAL-COAL 100000 665550 39323
DURGAPUR TPS DVC THERMAL-COAL 21000 59270 35416
RAGHUNATHPUR TPS DVC THERMAL-COAL 120000 201650 35326
MAITHON HYDEL STA DVC HYDRO-HYDRO 6320 12200 17984
CHANDRAPURA TPSU1-3 DVC THERMAL-COAL 42000 257610 35095
CHANDRAPURA TPSU7-8 DVC THERMAL-COAL 50000 306673 34987
KODERMA TPS DVC THERMAL-COAL 100000 380180 38131
PANCHET HPS DVC HYDRO-HYDRO 8000 13360 17984
TILLAYA HPS DVC HYDRO-HYDRO 400 1410 17984
RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34700 35400
TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 277300 23200
TLDP -III NHPC LTD HYDRO-HYDRO 13200 55400 62000
TLDP -IV NHPC LTD HYDRO-HYDRO 16000 60300 25600
FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 957219 33700
FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 308943 41000
BONGAINGAON TPS NTPC LTD THERMAL-COAL 25000 153663 58600
KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 542277 34200
KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 942591 34200
BARH-II NTPC LTD THERMAL-COAL 132000 728021 44500
TALCHER TPS NTPC LTD THERMAL-COAL 46000 335521 30100
TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 702319 25600
TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1436521 24700
STATE SECTOR
BTPS(RampM) BIHAR STATE PGCL THERMAL-COAL 22000 12142 39700
BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 98331 10602
HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 50593 9482
CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 19689 2605
RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 53192 6033
UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 147208 14637
Page 40
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 60353 4519
IB TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 288567 25000
J P H GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 210 038 61100
MEYONG CHU GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 400 1086 61100
TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 122667 38200
DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 214339 43321
KOLAGHAT THERMAL POWER
STATION
WEST BENGAL PDCL THERMAL-COAL 126000 538269 31603
BAKRESHWAR THERMAL POWER
PLANT
WEST BENGAL PDCL THERMAL-COAL 105000 634876 32154
BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 45000 166855 33299
SANTHALDIH THERMAL POWER
STATION
WEST BENGAL PDCL THERMAL-COAL 50000 336442 34932
SAGARDIGHI THERMAL POWER
PROJECT
WEST BENGAL PDCL THERMAL-COAL 160000 423121 34705
JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 20344 68900
RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 24559 68900
TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 4623 68900
PURULIA PUMPED STORAGE
PROJECT
WEST BENGAL SEDCL HYDRO-HYDRO 90000 108816 68900
MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2768 68900
PRIVATE SECTOR
CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 49474 20230
CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 555500 70200
HALDIA ENERGY HALDIA ENERGY LTD THERMAL-COAL 60000 371000 50400
DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3688 63400
KAMALANGA TPS GMR KAMALANGA ENERGY LTD THERMAL-COAL 105000547670
33300
ADHUNIK POWER U-1 ADHUNIK POWER THERMAL-COAL 27000 158 44060
ADHUNIK POWER U-2 ADHUNIK POWER THERMAL-COAL 27000 168 44250
VL-JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 332800 23622
JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 43000 45250
JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 71700 37030
JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 70700 35920
JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 71100 38870
JOJOBERA UNIT 5 TATA POWER COM LTD THERMAL-COAL 12000 79300 44560
JOJOBERA UNIT 6 TATA POWER COM LTD THERMAL-WHR 12000 83700 12840
IEL KALINGANAGAR U-I TATA POWER COM LTD THERMAL-WG 6750 33400 22500
IEL KALINGANAGAR U-II TATA POWER COM LTD THERMAL-WG 6750 34800 22500
MAITHON UNIT 1 amp 2 TATA POWER COM LTD THERMAL-COAL 105000 678000 36100
HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 27500 24340
HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 28400 24340
HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 15800 24310
NORTH EASTERN REGION
CENTRAL SECTOR
LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 74100 36600
AGARTALA GT NEEPCO THERMAL-GAS 13500 88611 27210
ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 153111 32310
DOYANG HEP NEEPCO HYDRO-HYDRO 7500 25598 49801
KOPILI HEP NEEPCO HYDRO-HYDRO 20000 98186 11491
KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 19582 20237
KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 10310 17968
RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 124093 22945
TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 10100 17344 39000
STATE SECTOR
HYDRO POWER (122 Stns) ITANAGAR GOVT OF ARUNACHAL
PRADESHHYDRO-HYDRO 6971 6217270
24600
KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39514 17337
LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 82327 36810
NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 33318 48290
MYNTRIANG SHEP ST II ASSAM POWER GENCO HYDRO-HYDRO 300 567 35776
LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 9130 49200
LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 012 49200
DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 022 49200
TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 000 49200
UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 4990 16000
UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 6476 37000
UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 16494 14600
UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 3600 9556 15000
SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 758 8000
MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44070 44800
KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 154 41400
TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 091 41400
MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 411 41400
MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 394 41400
KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 760 41400
SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 3264 41400
LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 044 41400
BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 18953 28000
ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 43585 28200
GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 4080 11100
Note
LIG Lignite N Naptha WHR Waste Heat Recovery
Page 41
File NoCEA-CH-14-1142018-Coordination Division
SNo Contents Page
1 Growth of Installed Capacity since 6th Plan 29
2 Progress of Transmission Sector since 6th Plan 30
3 All India Yearly Coal consumption for Power Generation (Utilities)
4 All India Annual Per Capita Consumption of Electricity since -2006
5 Average cost of power supply amp Average realisation (Paisakwh)
6 Growth of Rural Electrification amp Pump Sets Energisation
7 Status of Hydro Schemes Cleared by the CEA in Oct-2018
Section G - Growth of Power Sector
31
32
File NoCEA-CH-14-1142018-Coordination Division
(In MW)
Coal Gas Diesel Total
End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472
End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634
End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537
End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596
End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921
End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703
End of 12th Plan 19216288 2532938 83763 21832988 6780 4447842 50018 31960630
Up to Oct-2018 19599250 2493722 837629 22176734 6780 4548742 7201281 34604757
Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-17) = 51529 MW
Electricity Generation (MU) Targets and Achievements for 2016-17
Coal Gas Diesel Nuclear Hydro Res Total
1959925 2493722 837629 678000 454874 72012805 22925174
29
1 Growth of Installed Capacity Since 6th Plan
Plan YearThermal
Nuclear Hydro RES (MNRE) Total
Total Installed Capacity 34604757 MW
Coal Gas Diesel Nuclear Hydro Res
File NoCEA-CH-14-1142018-Coordination Division
Progress of Transmission Sector in the Country up to Oct 2018
1 TRANSMISSION LINES (All fig in CKM)
At the end of
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
6th plan 0 0 0 0 0 0 0 0 0 0 0 0 1831 4198 0 6029 1641 44364 0 46005 3472 48562 0 52034
7th plan 0 0 0 0 0 0 0 0 0 0 0 0 13068 6756 0 19824 4560 55071 0 59631 17628 61827 0 79455
8th plan 0 0 0 0 1634 0 0 1634 0 0 0 0 23001 13141 0 36142 6564 73036 0 79600 31199 86177 0 117376
9th plan 0 0 0 0 3234 1504 0 4738 751 409 0 1160 29345 20033 0 49378 8687 88306 0 96993 42017 110252 0 152269
10th plan 0 0 0 0 4368 1504 0 5872 1775 409 0 2184 48708 24730 0 73438 9444 105185 0 114629 64295 131828 0 196123
11th Plan 0 0 0 0 5948 1504 1980 9432 4839 411 0 5250 71023 30191 5605 106819 10140 125010 830 135980 91950 157116 8415 257481
12th Plan 6124 0 0 6124 5948 1504 1980 9432 25465 1177 4598 31240 92482 48240 17065 157787 11014 151276 978 163268 141033 202197 24621 367851
13th Plan (Up
to Mar2018)6124 0 0 6124 5948 1504 1980 9432 28666 1512 4881 35059 98247 54286 19067 171600 11258 156497 1000 168755 150243 213799 26928 390970
13th Plan (Up
to Sep-18)6124 0 0 6124 5948 1504 1980 9432 30952 1512 5059 37523 99683 56069 20662 176414 11318 160958 1000 173276 154025 220043 28701 402769
27150
75050
47900
118050
90650
30
IR addition in 12th Plan (up to
March 2017)
Total IR (up to Oct-18)
IR at the end of 11th Plan
IR at the end of 12th Plan
Envisaged IR Capacity at the end
of 13th Plan
Grand Total
Note - The figure upto the end of 10th plan in for stringing progress including the lines not commissioned Now only commissioned lines are reckoned Accordingly the figure for 10th plan (end) may read as 187555 after adjusting with (-) 10852 Ckm
Inter-regional Power Transfer Capacity
plusmn 800 kV HVDC plusmn 500 kV HVDC 765 kV 400 kV 220 kV
File NoCEA-CH-14-1142018-Coordination Division
2004-05 27800
2005-06 28100
2006-07 30200
2007-08 33000
2008-09 35500
2009-10 36700
2010-11 38700
2011-12 41756
2012-13 45460
2013-14 48940
2014-15 53040
2015-16 54590
2016-17 57430
2017-18 60800
Year
2005-06
2006-07
2007-08
2008-09
2009-10
2010-11
2011-12
2012-13
2013-14
2014-15
2015-16
2016-17
2017-18
2004-05 254 209 7568
2005-06 260 221 7636
2006-07 276 227 7423
2007-08 293 239 7727
2008-09 340 263 8713
2009-10 355 268 8870
2010-11 398 303 11975
2011-12 455 330 13514
2012-13 501 376 14867
2013-14 518 175
2014-15 520
6719
7171
3 All India yearly Coal Consumption for Power Generation (Utilities)
YEARCoal Consumption
Million Tonnes
4 All India Annual per Capita consumption of Electricity Since 2006
Per Capita Consumption ( kWh)
6314
(GrossGen+ Net Import) Mid-year population
5 Average cost of power supply amp average realization ( paiseKWH )
Yearcost of supply
(paiseunit)
Realization(paiseunit)
Including AgricultureOnly
Agriculture
1149
7335
7786
91441
8188
88363
957
1010
1075
1122
File NoCEA-CH-14-1142018-Coordination Division
Source- PFC Reports on the performance of State Power Utilities 31
File NoCEA-CH-14-1142018-Coordination Division
Sl
NoExecuting Agency
Installed
Capacity (MW)Cost (Rs crore)
Date of
Clearance
32
No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification
since 2004-05
65291374575 296361511th Plan
Cumu upto End of 11th Plan
596556 21212860
557439Cummulative up to end of 12th Plan
46708
18423975
499150
2003-042004-05
5743
9769
Cumu upto End of 10th Plan
010407 to 310308
010410 to 310311557976840909
010411 to 310312
412667
86293726
3207
482864
12632
1576036
4451722594
15455554
2314176
397343611750
2093311060316074
65109527813884
6 Growth Of Rural Electrification amp Pumpsets Energisation
Plan Year
9th Plan2002-03
134092626
4111
Pump Sets Energised Villages Electricfied (Nos)
2001-02
284064367244
1218
27801997-981998-991999-002000-01
297594
010408 to 310309010409 to 310310
10th Plan
2005-062006-07
322968331020
Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as
Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received
from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made
available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified
villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is
independent of the earlier published reports
No Hydro Electric Project has been issued concurrenceAppraisal letter by CEA during October 2018
7 Status of Hydro Schemes Cleared by the CEA in Oct-2018
Name of Scheme
File NoCEA-CH-14-1142018-Coordination Division
SN Contents Page
1 Rate of sale of power for the year 2016-17 33-41
RATE OF SALE OF POWER FOR THE YEAR 2016-17
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) NORTHERN REGION
CENTRAL SECTOR
BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 18000 66900 19800
CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 54000 222400 21600
CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 30000 144400 19600
CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 23100 91700 42600
PARBATI - III HPS NHPC LTD HYDRO-HYDRO 52000 68200 54800
DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 28000 95600 30000
CHUTAK NHPC LTD HYDRO-HYDRO 4400 22000 79800
DULHASTI HPS NHPC LTD HYDRO-HYDRO 39000 228000 56400
SALAL HPS NHPC LTD HYDRO-HYDRO 69000 342300 11000
TANAKPUR HPS NHPC LTD HYDRO-HYDRO 9420 43000 29600
URI HPS -I NHPC LTD HYDRO-HYDRO 48000 280300 16000
URI HPS - II NHPC LTD HYDRO-HYDRO 24000 147300 48600
NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 4500 24600 88200
SEWA - II NHPC LTD HYDRO-HYDRO 12000 47100 43400
ANTA CCPP NTPC LTD THERMAL-GASN 41930 67539 32400
AURAIYA CCPP NTPC LTD THERMAL-GASN 66336 53501 39100
BADARPUR TPS NTPC LTD THERMAL-COAL 70500 159153 44800
DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 84000 296170 42300
DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 98000 526686 46300
DADRI CCPP NTPC LTD THERMAL-GASHSD 82978 227469 33000
FARIDABAD CCPP NTPC LTD THERMAL-GASN 43159 115577 30800
RIHAND STPS I NTPC LTD THERMAL-COAL 100000 596766 24500
RIHAND STPS II NTPC LTD THERMAL-COAL 100000 737069 24600
RIHAND STPS III NTPC LTD THERMAL-COAL 100000 706546 30600
SINGRAULI STPS NTPC LTD THERMAL-COAL 200000 1394068 20400
TANDA TPS NTPC LTD THERMAL-COAL 44000 295438 40800
UNCHAHAR TPS I NTPC LTD THERMAL-COAL 42000 256454 39800
UNCHAHAR TPS II NTPC LTD THERMAL-COAL 42000 273577 38900
UNCHAHAR TPS III NTPC LTD THERMAL-COAL 21000 142780 43000
KOLDAM NTPC LTD HYDRO-HYDRO 80000 363260 43600
NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 303575 25841
RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 108000 668677 35374
NJHPS SJVNL HYDRO-HYDRO 150000 699496 23820
RAMPUR HPS SJVNL HYDRO-HYDRO 41202 195982 32260
TEHRI HPP THDC HYDRO-HYDRO 100000 272543 51800
KOTESHWAR HEP THDC HYDRO-HYDRO 40000 106244 53400
IGSTPS JHAJJAR ARAVALI P CPL THERMAL-COAL 150000 510429 49490
NEYVELI BARSINGSAR NEYVELI LIG CORP LTD THERMAL-LIG 25000 127520 38040
STATE SECTOR
PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 21000 14222 48200
PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 21000 19205 48400
PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 25000 102257 42600
PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 25000 62107 41800
DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 60000 312213 41000
RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 120000 35767442200
WYC HYDEL STATION HPGCL HYDRO-HYDRO 6240 20365 24900
GIRI POWER HOUSE HPSEB HYDRO-HYDRO 6000 13958 7600
ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 1695 5467 11900
BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 12000 18528 6700
GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 2250 7462 22500
BASSI POWER HOUSE HPSEB HYDRO-HYDRO 6600 29649 7500
BINWA POWER HOUSE HPSEB HYDRO-HYDRO 600 2749 19300
ANNEXURE-I
RATE OF SALE OF POWER FOR THE YEAR 2016-2017
Page 33
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) GAJ POWER HOUSE HPSEB HYDRO-HYDRO 1050 2914 26700
BANER POWER HOUSE HPSEB HYDRO-HYDRO 1200 2864 16200
HOLI POWER HOUSE HPSEB HYDRO-HYDRO 300 616 22500
THIROT POWER HOUSE HPSEB HYDRO-HYDRO 450 1126 22500
KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 1200 3064 22500
LARJI POWER HOUSE HPSEB HYDRO-HYDRO 12600 53677 23700
NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 250 750 31000
CHABA POWER HOUSE HPSEB HYDRO-HYDRO 175 465 23300
RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 150 101 13400
SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 200 000 22500
KILLAR HPSEB HYDRO-HYDRO 030 050 22500
BHABA AUGUMENP H HPSEB HYDRO-HYDRO 450 1276 22500
BS CHAMBA HPSEB HYDRO-HYDRO 045 099 19500
GUMMA HPSEB HYDRO-HYDRO 300 423 22500
GAS TURBINE POWER STATION IPGCL THERMAL-GAS 27000 67233 39300
PPS-I PPCL THERMAL-GAS 33000 175905 38300
PPS-III PPCL THERMAL-GAS 137120 196879 36100
LOWER JHELUM JampKPDD HYDRO-HYDRO 10500 60214 5100
UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 2260 10514 6300
UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 10500 44202 8500
GANDHARBAL JampKPDD HYDRO-HYDRO 1500 8925 4700
KARNAH MPH JampKPDD HYDRO-HYDRO 200 1122 31000
CHENANI I JampKPDD HYDRO-HYDRO 2330 10892 6600
CHENANI II JampKPDD HYDRO-HYDRO 200 1188 9300
CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 750 3634 14200
IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 375 2108 18500
IGO MERCHELLONG JampKPDD HYDRO-HYDRO 300 1572 29700
PAHALGAM MHP JampKPDD HYDRO-HYDRO 450 1713 32900
MARPACHOO JampKPDD HYDRO-HYDRO 075 375 29800
HAFTAL JampKPDD HYDRO-HYDRO 100 483 28700
SANJAK JampKPDD HYDRO-HYDRO 126 441 36000
SEWA-III JampKPDD HYDRO-HYDRO 900 3273 20200
BHADERWAH JampKPDD HYDRO-HYDRO 150 935 8900
BAZGO JampKPDD HYDRO-HYDRO 030 108 33300
SUMOOR JampKPDD HYDRO-HYDRO 010 045 35400
HUNDER JampKPDD HYDRO-HYDRO 040 176 26200
STAKNA JampKPDD HYDRO-HYDRO 400 1933 4100
KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 124000 662879 31360
SURATGARH TPS RRVUNL THERMAL-COAL 150000 402328 41730
CHHABRA TPS 1amp 2 RRVUNL THERMAL-COAL 50000 305946 36700
CHHABRA TPS 3 RRVUNL THERMAL-COAL 25000 151536 36700
CHHABRA TPS 4 RRVUNL THERMAL-COAL 25000 155896 36700
RAMGARH GT POWER PROJECT RRVUNL THERMAL-COAL 22050 43177 41800
RAMGARH GAS T P PROJECT 3 RRVUNL THERMAL-GAS 5000 93615 41800
DHOLPUR C C POWER PROJECT RRVUNL THERMAL-R-LNG 33000 9486 46110
MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 14000 20855 34192
MINI MICRO HYDEL (MMH) P S RRVUNL HYDRO-HYDRO 2385 851 37800
KALISINDH TPP 1 RRVUNL THERMAL-COAL 60000 341543 45000
KALISINDH TPP 2 RRVUNL THERMAL-COAL 60000 211588 45000
KHARA HEP UPJVNL HYDRO-HYDRO 7200 26654 7200
MATATILLA HEP UPJVNL HYDRO-HYDRO 3060 12219 6500
OBRA HEP UPJVNL HYDRO-HYDRO 9900 21517 6300
RIHAND UPJVNL HYDRO-HYDRO 30000 57369 5500
ANPARA A TPS UPRVUNL THERMAL-COAL 63000 317536 27000
ANPARA B TPS UPRVUNL THERMAL-COAL 100000 705605 22700
ANPARA D UPRVUNL THERMAL-COAL 100000 300158 39800
HARDUAGANJ TPS UPRVUNL THERMAL-COAL 16500 45817 49200
HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 50000 304389 46600
OBRA A TPS UPRVUNL THERMAL-COAL 28800 13158 34000
OBRA B TPS UPRVUNL THERMAL-COAL 100000 328124 21900
Page 34
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) PANKI TPS UPRVUNL THERMAL-COAL 21000 66488 50300
PARICHHA TPS UPRVUNL THERMAL-COAL 22000 38762 49400
PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 42000 231931 45600
PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 50000 276722 50400
CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 24000 70845 8290
CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 14400 75366 8390
DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 3375 9595 12080
DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 5100 18701 10520
KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4140 17359 12330
KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 12000 33001 9420
KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 3000 11953 8320
TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 9000 33983 12460
MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 30400 124510 16110
RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 19800 17897 10550
MPUR UTTARAKHAND JVNL HYDRO-HYDRO 930 5121 19200
PATHRI UTTARAKHAND JVNL HYDRO-HYDRO 2040 11636 14200
GALOGI UTTARAKHAND JVNL HYDRO-HYDRO 300 648 12500
PRIVATE SECTOR
MGTPP CLP INDIA PVT LTD THERMAL-COAL 132000 268902 41940
SHRINAGAR HEP ALAKNANDA HPCL HYDRO-HYDRO 33000 127414 48800
GAMA INFRAPROP CCPP GAMA INFRAPROP PVT THERMAL-GAS 22500 52686 47000
PPGCL (BARA) JP POWER VENTURES LTD THERMAL-COAL 198000 448200 38500
MALANA HEP MALANA PCL HYDRO-HYDRO 8600 26354 29792
MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 10000 30369 32580
ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 19200 56347 36079
KASHANG HEP H P PCL HYDRO-HYDRO 19500 5034 29200
BASPA-II HEP HBPCL HYDRO-HYDRO 30000 132769 13600
KARCHAM WANGTOO HEP HBPCL HYDRO-HYDRO 100000 434386 36600
RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 108000 582600 43700
RITHALA COMBI CY POWER PLANT TATA POWER DDL THERMAL-GAS 9480 000 11900
RAJPURA TPS NABHA POWER LTD THERMAL-GAS 140000 901484 39000
TALWANDI SABO POWER LTD TALWANDI SABO POWER LTD THERMAL-COAL 198000 636040 49548
ROJA THERMAL POWER STATION ROJA POWER SCL THERMAL-COAL 120000 727200 43400
KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 34400 63400
BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 36000 62600
MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 38200 60800
UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 37900 61500
KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 42300 58800
LALITPUR PGCL BAJAJ ENERGY PVT LTD THERMAL-COAL 198000 359400 47300
PRAYAGRAJ PGCL PRAYAGRAJ PGCL THERMAL-COAL 132000 448200 38595
KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 132000 783182 33438
WESTERN REGION
CENTRAL SECTOR
INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 100000 325333 23892
OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 52000 141663 34001
GANDHAR CCPP NTPC LTD THERMAL-GAS 65739 221924 28700
KAWAS CCPP NTPC LTD THERMAL-GASN 65620 167929 27000
KORBA I amp II NTPC LTD THERMAL-COAL 210000 1499171 20500
KORBA III NTPC LTD THERMAL-COAL 50000 358746 26600
SIPAT STPS I NTPC LTD THERMAL-COAL 198000 1479902 26800
SIPAT STPS II NTPC LTD THERMAL-COAL 100000 766549 26500
VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 126000 693142 25800
VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 100000 608781 23800
VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 100000 673475 27600
VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 100000 655924 32900
VINDHYACHAL STPS V NTPC LTD THERMAL-COAL 50000 328265 31700
MOUDA I NTPC LTD THERMAL-COAL 100000 343130 44500
MOUDA Ii NTPC LTD THERMAL-COAL 66000 40637 39900
RATNAGIRI GAS amp POWER PVT LTD RGPPL THERMAL-GAS 196708 442485 47000
KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 000 24729
TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 32000 201227 10740
Page 35
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 365122 19069
TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 787444 29324
STATE SECTOR
GSEG-HAZIRA15610 MW GUJARAT S ENEGEN LTD THERMAL-GAS 15610 1805 28200
GSEG-HAZIRA35143 MW GUJARAT S ENEGEN LTD THERMAL-GAS 35130 22276 51300
GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 21978 51800
AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 13929 26100
KORBA TPS EAST CSPGCL THERMAL-COAL 44000 198673 33880
DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 365808 27570
KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 316500 30420
HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 532878 19410
CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 515 58300
MTTPS CHAMPA U-I CSPGCL THERMAL-COAL 50000 220376 39000
MTTPS CHAMPA U-II CSPGCL THERMAL-COAL 50000 23709 10000
SHP GANGREL CSPGCL HYDRO-HYDRO 1000 2350 36790
BANGO HEP CSPGCL HYDRO-HYDRO 12000 14662 8900
MHP KORBA WEST CSPGCL HYDRO-HYDRO 170 859 38190
SIKASAR HEP CSPGCL HYDRO-HYDRO 700 418 26870
DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8843 74500
DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 19446 51500
GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 66388 71600
GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127488 41300
KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 96072 43900
KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 29841 56400
SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 184966 58800
UKAI 1-5 GSECL THERMAL-COAL 85000 204891 46900
UKAI TPS 6 GSECL THERMAL-COAL 50000 284448 48200
WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 271999 58300
WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 82808 44100
KADANA HPS GSECL HYDRO-HYDRO 24200 34433 16800
UKAI HPS GSECL HYDRO-HYDRO 30500 40585 6100
TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 123000 11500
BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 8900 10900
BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 7200 27500
JHINNA HPS MPPGCL HYDRO-HYDRO 2000 9700 18500
RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 44300 3400
GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 17300 4600
SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 4100 16900
MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 14600 27000
PENCH HPS MPPGCL HYDRO-HYDRO 16000 23700 8100
RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 3000 16900
AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 134400 35100
SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 283800 38700
SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 344600 34300
SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 111600 61600
SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 211800 58000
SSTPS PH-I MPPGCL THERMAL-COAL 120000 233100 84300
BHUSAWAL TPS MSPGCL THERMAL-COAL 142000 566258 51100
CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1365682 33700
KHAPERKHEDA MSPGCL THERMAL-COAL 134000 706207 39100
KORADI TPS MSPGCL THERMAL-COAL 62000 443206 42000
NASIK TPS MSPGCL THERMAL-COAL 63000 297275 47000
PARLI TPS MSPGCL THERMAL-COAL 113000 175934 71600
PARAS MSPGCL THERMAL-COAL 50000 267931 38700
URAN CCPP MSPGCL THERMAL-GAS 67200 320330 30600
KOYANA MSPGCL HYDRO-HYDRO 195600 328155 13100
SMALL HYDRO POWER PLANTS MSPGCL HYDRO-HYDRO 45400 93062 30500
BHIRA MSPGCL HYDRO-HYDRO 8000 10046 8400
TILLARI MSPGCL HYDRO-HYDRO 8900 10584 3100
SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 233298 20500
SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 87633 20500
PRIVATE SECTOR
Page 36
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 81282 46750
JNSTPP(JAYPEE NIGRIE) JP POWER VENTURES LTD THERMAL-COAL 132000 726695 29310
MB POWER MB POWER THERMAL-COAL 120000 345632 38310
ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 754922 28671
ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 780761 23495
ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 198000 1263784 32090
ADANI POWER MAHARA ADANI POWER LTD THERMAL-COAL 330000 1666191 34124
AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 170065 36827
SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 252035 45129
ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 458551 36000
ESSAR POWER MP LTD ESSAR POWER MP LTD THERMAL-COAL 60000 243040 28600
VEDANTA LTD (P P -I) VEDANTA LTD THERMAL-GAS 3000 15044 24000
VEDANTA LTD (P P -II) VEDANTA LTD THERMAL-GAS 3000 21293 24000
PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 8234600 24000
165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 5850 64390
145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 68717 40349
SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 132655 28776
SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 144686 38567
MUNDRA UMPPCOASTAL GUJARAT POWER
LTD THERMAL-IMP COAL 400000 2530300
23900
LANCO AMARKANTAK TPP PATHADIH
U-ILANCO AMARKAN POWER LTD THERMAL-COAL 30000 195500
29200
LANCO AMARKANTAK TPP PATHADIH
U-IILANCO AMARKAN POWER LTD THERMAL-COAL 30000 206900
27600
BARADARHA TPS D B POWER LTD THERMAL-COAL 120000 677373 29200
JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 405000 28900
JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 453000 40500
DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 339437 40700
TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 293400 44000
TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 137200 37000
TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 174900 44000
BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 92900 14100
BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23700 34300
KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 27600 48300
CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2530300 23900
BHANDARDRA HEP -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 2475 54900
SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 161400 26500
SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 445000 39000
SOTHERN REGION
CENTRAL SECTOR
NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 325699 54820
NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 305532 39880
NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 998805 38510
NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 113016 54070
NEYVELI TAMILNADU POWER LTD JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 625274 42200
VALLUR TPS NTPC TECL THERMAL-COAL 150000 856438 42350
R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 1493 84300
RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1502919 29400
RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 341291 31800
SIMHADRI I NTPC LTD THERMAL-COAL 100000 688382 36800
SIMHADRI II NTPC LTD THERMAL-COAL 100000 663657 43400
KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 593110 31324
MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 291625 21764
KKNPP-1 amp 2 NPCIL NUCLEAR-NUCLEAR 200000 572609 40948
MINICOY LAKSHADEEP THERMAL-DIESEL 340 770 29600
KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1097 29600
AMINI LAKSHADEEP THERMAL-DIESEL 265 509 29600
ANDROTT LAKSHADEEP THERMAL-DIESEL 219 524 29600
KALPENI LAKSHADEEP THERMAL-DIESEL 175 356 29600
AGATTI LAKSHADEEP THERMAL-DIESEL 195 658 29600
KADMAT LAKSHADEEP THERMAL-DIESEL 190 414 29600
KILTAN LAKSHADEEP THERMAL-DIESEL 150 269 29600
CHETLET LAKSHADEEP THERMAL-DIESEL 100 139 29600
BITRA LAKSHADEEP THERMAL-DIESEL 043 024 29600
BANGARAM LAKSHADEEP THERMAL-DIESEL 018 009 29600
Page 37
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) STATE SECTOR
Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 721811 46500
Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 50000 336142 46500
RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 237358 46500
RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 239926 46500
RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 124500 46500
SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 62109 46500
UPPER SILERU APGENCO HYDRO-HYDRO 24000 33000 46500
LOWER SILERU APGENCO HYDRO-HYDRO 46000 81066 46500
DONKARAI APGENCO HYDRO-HYDRO 2500 6007 46500
PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 1262 46500
CHETTIPETA APGENCO HYDRO-HYDRO 100 214 46500
MUCHKUND APGENCO HYDRO-HYDRO 12000 37571 46500
NAGARJUNASAGAR RCPH APGENCO HYDRO-HYDRO 9000 606 46500
TUNGABHADRA HES amp HAMPI(AP
Share)
APGENCO HYDRO-HYDRO 7200 6100 46500
KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 352232 42600
KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 288131 32500
KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 319272 46500
RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 40073 44300
KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 308317 46000
KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 308963 51300
SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 61004 76600
NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 17960 75300
PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 20873 58300
POCHAMPAD-I TSPGENCO HYDRO-HYDRO 2700 5455 29800
POCHAMPAD-II TSPGENCO HYDRO-HYDRO 900 1932 40700
NIZAMSAGAR TSPGENCO HYDRO-HYDRO 1000 1126 53400
RAICHUR TPS 1 to 7 KPCL THERMAL-COAL 147000 890866 43800
RAICHUR TPS 8 KPCL THERMAL-COAL 25000 159523 48200
BELLARI TPS 1 KPCL THERMAL-COAL 50000 318679 51100
BELLARI TPS 2 KPCL THERMAL-COAL 50000 232347 55600
BELLARI TPS 3 KPCL THERMAL-COAL 70000 47565 34400
BHADRA PH KPCL HYDRO-HYDRO 3920 2369 45900
GERUSUPPA PH KPCL HYDRO-HYDRO 24000 26990 22000
GHAT PRABHA HEP KPCL HYDRO-HYDRO 3200 4777 25300
KADRA HPS KPCL HYDRO-HYDRO 15000 16889 26800
NAGJHARI KPCL HYDRO-HYDRO 90000 155159 9800
KODASALLI DPH KPCL HYDRO-HYDRO 12000 14854 19200
MUNIRA+MGH+SPH+SPH KPCL HYDRO-HYDRO 22640 48211 7900
SHARAVATHY HPS KPCL HYDRO-HYDRO 108550 276215 5400
ALMATTI DPH KPCL HYDRO-HYDRO 29000 39611 24600
VARAHI UGPH KPCL HYDRO-HYDRO 46000 71368 15600
IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 17196 15300
IDUKKI HPS KSEB HYDRO-HYDRO 78000 137905 15300
KAKKAD HPS KSEB HYDRO-HYDRO 5000 13063 15300
KALLADA HPS KSEB HYDRO-HYDRO 1500 4436 15300
KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 46544 15300
KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 635 15300
LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 30822 15300
MALANKARA HPS KSEB HYDRO-HYDRO 1050 2474 15300
MATTUPETTY KSEB HYDRO-HYDRO 200 230 15300
MALAMPUZHA KSEB HYDRO-HYDRO 250 063 15300
CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 864 15300
URUMI ST I amp II KSEB HYDRO-HYDRO 615 903 15300
LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 248 15300
NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7765 19625 15300
PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 16601 15300
PANNIAR HPS KSEB HYDRO-HYDRO 3240 6217 15300
PORINGALKUTHU KSEB HYDRO-HYDRO 3600 10052 15300
PORINGALKUTHU LBE KSEB HYDRO-HYDRO 1600 9438 15300
PEPPARA KSEB HYDRO-HYDRO 300 395 15300
POOZHITHODE KSEB HYDRO-HYDRO 480 1045 15300
Page 38
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) PEECHI KSEB HYDRO-HYDRO 125 040 15300
RANI-PERUNADU KSEB HYDRO-HYDRO 400 585 15300
SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 79783 15300
SENGULAM HPS KSEB HYDRO-HYDRO 5120 11558 15300
SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 16711 15300
VILANGAD KSEB HYDRO-HYDRO 750 1578 15300
BARAPOLE KSEB HYDRO-HYDRO 1500 1932 15300
VELLATHOOVAL KSEB HYDRO-HYDRO 360 305 15300
CHIM0NY KSEB HYDRO-HYDRO 250 156 15300
ADYANPARA KSEB HYDRO-HYDRO 350 501 15300
BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 554 15300
KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 3801 15300
KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 23132 32800
ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 14416 62280
METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 523970 62280
METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 321270 62280
NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 336575 62280
NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 591240 62280
TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 508966 62280
KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 30897 62280
VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 18720 90699 62280
KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 33593 62280
BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 1047 62280
PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 1250 62280
PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 330 62280
MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 4897 62280
MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 032 62280
KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15681 62280
KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 40608 62280
KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 21342 62280
KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 4717 62280
KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4322 62280
KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2399 62280
METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 4416 62280
METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 8035 62280
BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2187 62280
BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2359 62280
BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2511 62280
BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 1949 62280
BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 1819 62280
POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 172 62280
SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 241 62280
MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 026 62280
THIRUMOORTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 136 62280
PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 9309 62280
VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 353 62280
SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 4192 62280
PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 6571 62280
SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 1186 62280
SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6319 62280
ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 6122 62280
KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 28674 62280
SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 18381 62280
SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 4258 62280
KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 12680 62280
KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4201 62280
ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 000 62280
PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 19175 62280
AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 078 62280
BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 504 62280
BHAVANI KATTALAI (BKB)(IIIampIII BB I amp II)TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 5847 62280
PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 000 62280
Page 39
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) SRI DAMODARAM STPS APPDCL THERMAL-COAL 160000 808108 36300
PRIVATE SECTOR
KARUPPUR TANJORE LANCO TANJORE PCL THERMAL-GAS 12000 48096 28770
SIMHAPURI ENERGY LTD SIMHAPURI ENERGY LTD THERMAL-COAL 60000 143900 39100
JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 7111 45500
SBU 1 JSW ENERGY LTD
VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 26000 159100
43300
SBU 2 JSW ENERGY LTD
VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 60000 247900
42800
LANCO KPLLANCO KONDAPALLI POWER
LTDTHERMAL-GAS 36814 85060
25776
LANCO KPL STG -IILANCO KONDAPALLI POWER
LTDTHERMAL-GAS 36600 12979
46330
LANCO KPL STG -IIIALANCO KONDAPALLI POWER
LTDTHERMAL-GAS 37100 85710
46330
LANCO KPL STG -III BLANCO KONDAPALLI POWER
LTDTHERMAL-GAS 37100 43639
46330
HINDUJA NATIONAL PCL HINDUJA NATIONAL PCL THERMAL-COAL 104000 303000 38200
MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 121164 49940
UDUPI POWER COR LTD ADANI POWER LTD THERMAL-COAL 120000 754613 42500
SPECTRUM POWER GENERATION
LTD SPECTRUM PG LTD THERMAL-GASN 20525 9256812
34952
TAQA NEYVELI POWER COM PVT
LTD TAQA NEYVELI THERMAL-LIG 25000 5840
34500
ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 251000 51000
ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 207860 36800
GMR VEMAGIRI POWER GENERATION
LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 30117
46450
EASTERN REGION
CENTRAL SECTOR
MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 64675 53113
MTPS STAGE - II KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 39000 1432 69138
BOKARO `B` TPS DVC THERMAL-COAL 63000 145670 31539
MEJIA TPS U 1-3 DVC THERMAL-COAL 63000 348298 31552
MEJIA TPS U 4 DVC THERMAL-COAL 21000 116099 34997
MEJIA TPS U 5-6 DVC THERMAL-COAL 50000 276427 35976
MEJIA TPS U 7-8 DVC THERMAL-COAL 100000 552854 36991
DURGAPUR STEEL TPS DVC THERMAL-COAL 100000 665550 39323
DURGAPUR TPS DVC THERMAL-COAL 21000 59270 35416
RAGHUNATHPUR TPS DVC THERMAL-COAL 120000 201650 35326
MAITHON HYDEL STA DVC HYDRO-HYDRO 6320 12200 17984
CHANDRAPURA TPSU1-3 DVC THERMAL-COAL 42000 257610 35095
CHANDRAPURA TPSU7-8 DVC THERMAL-COAL 50000 306673 34987
KODERMA TPS DVC THERMAL-COAL 100000 380180 38131
PANCHET HPS DVC HYDRO-HYDRO 8000 13360 17984
TILLAYA HPS DVC HYDRO-HYDRO 400 1410 17984
RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34700 35400
TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 277300 23200
TLDP -III NHPC LTD HYDRO-HYDRO 13200 55400 62000
TLDP -IV NHPC LTD HYDRO-HYDRO 16000 60300 25600
FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 957219 33700
FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 308943 41000
BONGAINGAON TPS NTPC LTD THERMAL-COAL 25000 153663 58600
KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 542277 34200
KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 942591 34200
BARH-II NTPC LTD THERMAL-COAL 132000 728021 44500
TALCHER TPS NTPC LTD THERMAL-COAL 46000 335521 30100
TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 702319 25600
TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1436521 24700
STATE SECTOR
BTPS(RampM) BIHAR STATE PGCL THERMAL-COAL 22000 12142 39700
BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 98331 10602
HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 50593 9482
CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 19689 2605
RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 53192 6033
UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 147208 14637
Page 40
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 60353 4519
IB TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 288567 25000
J P H GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 210 038 61100
MEYONG CHU GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 400 1086 61100
TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 122667 38200
DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 214339 43321
KOLAGHAT THERMAL POWER
STATION
WEST BENGAL PDCL THERMAL-COAL 126000 538269 31603
BAKRESHWAR THERMAL POWER
PLANT
WEST BENGAL PDCL THERMAL-COAL 105000 634876 32154
BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 45000 166855 33299
SANTHALDIH THERMAL POWER
STATION
WEST BENGAL PDCL THERMAL-COAL 50000 336442 34932
SAGARDIGHI THERMAL POWER
PROJECT
WEST BENGAL PDCL THERMAL-COAL 160000 423121 34705
JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 20344 68900
RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 24559 68900
TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 4623 68900
PURULIA PUMPED STORAGE
PROJECT
WEST BENGAL SEDCL HYDRO-HYDRO 90000 108816 68900
MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2768 68900
PRIVATE SECTOR
CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 49474 20230
CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 555500 70200
HALDIA ENERGY HALDIA ENERGY LTD THERMAL-COAL 60000 371000 50400
DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3688 63400
KAMALANGA TPS GMR KAMALANGA ENERGY LTD THERMAL-COAL 105000547670
33300
ADHUNIK POWER U-1 ADHUNIK POWER THERMAL-COAL 27000 158 44060
ADHUNIK POWER U-2 ADHUNIK POWER THERMAL-COAL 27000 168 44250
VL-JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 332800 23622
JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 43000 45250
JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 71700 37030
JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 70700 35920
JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 71100 38870
JOJOBERA UNIT 5 TATA POWER COM LTD THERMAL-COAL 12000 79300 44560
JOJOBERA UNIT 6 TATA POWER COM LTD THERMAL-WHR 12000 83700 12840
IEL KALINGANAGAR U-I TATA POWER COM LTD THERMAL-WG 6750 33400 22500
IEL KALINGANAGAR U-II TATA POWER COM LTD THERMAL-WG 6750 34800 22500
MAITHON UNIT 1 amp 2 TATA POWER COM LTD THERMAL-COAL 105000 678000 36100
HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 27500 24340
HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 28400 24340
HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 15800 24310
NORTH EASTERN REGION
CENTRAL SECTOR
LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 74100 36600
AGARTALA GT NEEPCO THERMAL-GAS 13500 88611 27210
ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 153111 32310
DOYANG HEP NEEPCO HYDRO-HYDRO 7500 25598 49801
KOPILI HEP NEEPCO HYDRO-HYDRO 20000 98186 11491
KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 19582 20237
KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 10310 17968
RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 124093 22945
TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 10100 17344 39000
STATE SECTOR
HYDRO POWER (122 Stns) ITANAGAR GOVT OF ARUNACHAL
PRADESHHYDRO-HYDRO 6971 6217270
24600
KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39514 17337
LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 82327 36810
NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 33318 48290
MYNTRIANG SHEP ST II ASSAM POWER GENCO HYDRO-HYDRO 300 567 35776
LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 9130 49200
LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 012 49200
DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 022 49200
TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 000 49200
UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 4990 16000
UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 6476 37000
UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 16494 14600
UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 3600 9556 15000
SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 758 8000
MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44070 44800
KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 154 41400
TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 091 41400
MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 411 41400
MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 394 41400
KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 760 41400
SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 3264 41400
LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 044 41400
BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 18953 28000
ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 43585 28200
GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 4080 11100
Note
LIG Lignite N Naptha WHR Waste Heat Recovery
Page 41
File NoCEA-CH-14-1142018-Coordination Division
(In MW)
Coal Gas Diesel Total
End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472
End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634
End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537
End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596
End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921
End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703
End of 12th Plan 19216288 2532938 83763 21832988 6780 4447842 50018 31960630
Up to Oct-2018 19599250 2493722 837629 22176734 6780 4548742 7201281 34604757
Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-17) = 51529 MW
Electricity Generation (MU) Targets and Achievements for 2016-17
Coal Gas Diesel Nuclear Hydro Res Total
1959925 2493722 837629 678000 454874 72012805 22925174
29
1 Growth of Installed Capacity Since 6th Plan
Plan YearThermal
Nuclear Hydro RES (MNRE) Total
Total Installed Capacity 34604757 MW
Coal Gas Diesel Nuclear Hydro Res
File NoCEA-CH-14-1142018-Coordination Division
Progress of Transmission Sector in the Country up to Oct 2018
1 TRANSMISSION LINES (All fig in CKM)
At the end of
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
6th plan 0 0 0 0 0 0 0 0 0 0 0 0 1831 4198 0 6029 1641 44364 0 46005 3472 48562 0 52034
7th plan 0 0 0 0 0 0 0 0 0 0 0 0 13068 6756 0 19824 4560 55071 0 59631 17628 61827 0 79455
8th plan 0 0 0 0 1634 0 0 1634 0 0 0 0 23001 13141 0 36142 6564 73036 0 79600 31199 86177 0 117376
9th plan 0 0 0 0 3234 1504 0 4738 751 409 0 1160 29345 20033 0 49378 8687 88306 0 96993 42017 110252 0 152269
10th plan 0 0 0 0 4368 1504 0 5872 1775 409 0 2184 48708 24730 0 73438 9444 105185 0 114629 64295 131828 0 196123
11th Plan 0 0 0 0 5948 1504 1980 9432 4839 411 0 5250 71023 30191 5605 106819 10140 125010 830 135980 91950 157116 8415 257481
12th Plan 6124 0 0 6124 5948 1504 1980 9432 25465 1177 4598 31240 92482 48240 17065 157787 11014 151276 978 163268 141033 202197 24621 367851
13th Plan (Up
to Mar2018)6124 0 0 6124 5948 1504 1980 9432 28666 1512 4881 35059 98247 54286 19067 171600 11258 156497 1000 168755 150243 213799 26928 390970
13th Plan (Up
to Sep-18)6124 0 0 6124 5948 1504 1980 9432 30952 1512 5059 37523 99683 56069 20662 176414 11318 160958 1000 173276 154025 220043 28701 402769
27150
75050
47900
118050
90650
30
IR addition in 12th Plan (up to
March 2017)
Total IR (up to Oct-18)
IR at the end of 11th Plan
IR at the end of 12th Plan
Envisaged IR Capacity at the end
of 13th Plan
Grand Total
Note - The figure upto the end of 10th plan in for stringing progress including the lines not commissioned Now only commissioned lines are reckoned Accordingly the figure for 10th plan (end) may read as 187555 after adjusting with (-) 10852 Ckm
Inter-regional Power Transfer Capacity
plusmn 800 kV HVDC plusmn 500 kV HVDC 765 kV 400 kV 220 kV
File NoCEA-CH-14-1142018-Coordination Division
2004-05 27800
2005-06 28100
2006-07 30200
2007-08 33000
2008-09 35500
2009-10 36700
2010-11 38700
2011-12 41756
2012-13 45460
2013-14 48940
2014-15 53040
2015-16 54590
2016-17 57430
2017-18 60800
Year
2005-06
2006-07
2007-08
2008-09
2009-10
2010-11
2011-12
2012-13
2013-14
2014-15
2015-16
2016-17
2017-18
2004-05 254 209 7568
2005-06 260 221 7636
2006-07 276 227 7423
2007-08 293 239 7727
2008-09 340 263 8713
2009-10 355 268 8870
2010-11 398 303 11975
2011-12 455 330 13514
2012-13 501 376 14867
2013-14 518 175
2014-15 520
6719
7171
3 All India yearly Coal Consumption for Power Generation (Utilities)
YEARCoal Consumption
Million Tonnes
4 All India Annual per Capita consumption of Electricity Since 2006
Per Capita Consumption ( kWh)
6314
(GrossGen+ Net Import) Mid-year population
5 Average cost of power supply amp average realization ( paiseKWH )
Yearcost of supply
(paiseunit)
Realization(paiseunit)
Including AgricultureOnly
Agriculture
1149
7335
7786
91441
8188
88363
957
1010
1075
1122
File NoCEA-CH-14-1142018-Coordination Division
Source- PFC Reports on the performance of State Power Utilities 31
File NoCEA-CH-14-1142018-Coordination Division
Sl
NoExecuting Agency
Installed
Capacity (MW)Cost (Rs crore)
Date of
Clearance
32
No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification
since 2004-05
65291374575 296361511th Plan
Cumu upto End of 11th Plan
596556 21212860
557439Cummulative up to end of 12th Plan
46708
18423975
499150
2003-042004-05
5743
9769
Cumu upto End of 10th Plan
010407 to 310308
010410 to 310311557976840909
010411 to 310312
412667
86293726
3207
482864
12632
1576036
4451722594
15455554
2314176
397343611750
2093311060316074
65109527813884
6 Growth Of Rural Electrification amp Pumpsets Energisation
Plan Year
9th Plan2002-03
134092626
4111
Pump Sets Energised Villages Electricfied (Nos)
2001-02
284064367244
1218
27801997-981998-991999-002000-01
297594
010408 to 310309010409 to 310310
10th Plan
2005-062006-07
322968331020
Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as
Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received
from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made
available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified
villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is
independent of the earlier published reports
No Hydro Electric Project has been issued concurrenceAppraisal letter by CEA during October 2018
7 Status of Hydro Schemes Cleared by the CEA in Oct-2018
Name of Scheme
File NoCEA-CH-14-1142018-Coordination Division
SN Contents Page
1 Rate of sale of power for the year 2016-17 33-41
RATE OF SALE OF POWER FOR THE YEAR 2016-17
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) NORTHERN REGION
CENTRAL SECTOR
BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 18000 66900 19800
CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 54000 222400 21600
CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 30000 144400 19600
CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 23100 91700 42600
PARBATI - III HPS NHPC LTD HYDRO-HYDRO 52000 68200 54800
DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 28000 95600 30000
CHUTAK NHPC LTD HYDRO-HYDRO 4400 22000 79800
DULHASTI HPS NHPC LTD HYDRO-HYDRO 39000 228000 56400
SALAL HPS NHPC LTD HYDRO-HYDRO 69000 342300 11000
TANAKPUR HPS NHPC LTD HYDRO-HYDRO 9420 43000 29600
URI HPS -I NHPC LTD HYDRO-HYDRO 48000 280300 16000
URI HPS - II NHPC LTD HYDRO-HYDRO 24000 147300 48600
NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 4500 24600 88200
SEWA - II NHPC LTD HYDRO-HYDRO 12000 47100 43400
ANTA CCPP NTPC LTD THERMAL-GASN 41930 67539 32400
AURAIYA CCPP NTPC LTD THERMAL-GASN 66336 53501 39100
BADARPUR TPS NTPC LTD THERMAL-COAL 70500 159153 44800
DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 84000 296170 42300
DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 98000 526686 46300
DADRI CCPP NTPC LTD THERMAL-GASHSD 82978 227469 33000
FARIDABAD CCPP NTPC LTD THERMAL-GASN 43159 115577 30800
RIHAND STPS I NTPC LTD THERMAL-COAL 100000 596766 24500
RIHAND STPS II NTPC LTD THERMAL-COAL 100000 737069 24600
RIHAND STPS III NTPC LTD THERMAL-COAL 100000 706546 30600
SINGRAULI STPS NTPC LTD THERMAL-COAL 200000 1394068 20400
TANDA TPS NTPC LTD THERMAL-COAL 44000 295438 40800
UNCHAHAR TPS I NTPC LTD THERMAL-COAL 42000 256454 39800
UNCHAHAR TPS II NTPC LTD THERMAL-COAL 42000 273577 38900
UNCHAHAR TPS III NTPC LTD THERMAL-COAL 21000 142780 43000
KOLDAM NTPC LTD HYDRO-HYDRO 80000 363260 43600
NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 303575 25841
RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 108000 668677 35374
NJHPS SJVNL HYDRO-HYDRO 150000 699496 23820
RAMPUR HPS SJVNL HYDRO-HYDRO 41202 195982 32260
TEHRI HPP THDC HYDRO-HYDRO 100000 272543 51800
KOTESHWAR HEP THDC HYDRO-HYDRO 40000 106244 53400
IGSTPS JHAJJAR ARAVALI P CPL THERMAL-COAL 150000 510429 49490
NEYVELI BARSINGSAR NEYVELI LIG CORP LTD THERMAL-LIG 25000 127520 38040
STATE SECTOR
PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 21000 14222 48200
PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 21000 19205 48400
PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 25000 102257 42600
PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 25000 62107 41800
DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 60000 312213 41000
RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 120000 35767442200
WYC HYDEL STATION HPGCL HYDRO-HYDRO 6240 20365 24900
GIRI POWER HOUSE HPSEB HYDRO-HYDRO 6000 13958 7600
ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 1695 5467 11900
BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 12000 18528 6700
GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 2250 7462 22500
BASSI POWER HOUSE HPSEB HYDRO-HYDRO 6600 29649 7500
BINWA POWER HOUSE HPSEB HYDRO-HYDRO 600 2749 19300
ANNEXURE-I
RATE OF SALE OF POWER FOR THE YEAR 2016-2017
Page 33
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) GAJ POWER HOUSE HPSEB HYDRO-HYDRO 1050 2914 26700
BANER POWER HOUSE HPSEB HYDRO-HYDRO 1200 2864 16200
HOLI POWER HOUSE HPSEB HYDRO-HYDRO 300 616 22500
THIROT POWER HOUSE HPSEB HYDRO-HYDRO 450 1126 22500
KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 1200 3064 22500
LARJI POWER HOUSE HPSEB HYDRO-HYDRO 12600 53677 23700
NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 250 750 31000
CHABA POWER HOUSE HPSEB HYDRO-HYDRO 175 465 23300
RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 150 101 13400
SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 200 000 22500
KILLAR HPSEB HYDRO-HYDRO 030 050 22500
BHABA AUGUMENP H HPSEB HYDRO-HYDRO 450 1276 22500
BS CHAMBA HPSEB HYDRO-HYDRO 045 099 19500
GUMMA HPSEB HYDRO-HYDRO 300 423 22500
GAS TURBINE POWER STATION IPGCL THERMAL-GAS 27000 67233 39300
PPS-I PPCL THERMAL-GAS 33000 175905 38300
PPS-III PPCL THERMAL-GAS 137120 196879 36100
LOWER JHELUM JampKPDD HYDRO-HYDRO 10500 60214 5100
UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 2260 10514 6300
UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 10500 44202 8500
GANDHARBAL JampKPDD HYDRO-HYDRO 1500 8925 4700
KARNAH MPH JampKPDD HYDRO-HYDRO 200 1122 31000
CHENANI I JampKPDD HYDRO-HYDRO 2330 10892 6600
CHENANI II JampKPDD HYDRO-HYDRO 200 1188 9300
CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 750 3634 14200
IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 375 2108 18500
IGO MERCHELLONG JampKPDD HYDRO-HYDRO 300 1572 29700
PAHALGAM MHP JampKPDD HYDRO-HYDRO 450 1713 32900
MARPACHOO JampKPDD HYDRO-HYDRO 075 375 29800
HAFTAL JampKPDD HYDRO-HYDRO 100 483 28700
SANJAK JampKPDD HYDRO-HYDRO 126 441 36000
SEWA-III JampKPDD HYDRO-HYDRO 900 3273 20200
BHADERWAH JampKPDD HYDRO-HYDRO 150 935 8900
BAZGO JampKPDD HYDRO-HYDRO 030 108 33300
SUMOOR JampKPDD HYDRO-HYDRO 010 045 35400
HUNDER JampKPDD HYDRO-HYDRO 040 176 26200
STAKNA JampKPDD HYDRO-HYDRO 400 1933 4100
KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 124000 662879 31360
SURATGARH TPS RRVUNL THERMAL-COAL 150000 402328 41730
CHHABRA TPS 1amp 2 RRVUNL THERMAL-COAL 50000 305946 36700
CHHABRA TPS 3 RRVUNL THERMAL-COAL 25000 151536 36700
CHHABRA TPS 4 RRVUNL THERMAL-COAL 25000 155896 36700
RAMGARH GT POWER PROJECT RRVUNL THERMAL-COAL 22050 43177 41800
RAMGARH GAS T P PROJECT 3 RRVUNL THERMAL-GAS 5000 93615 41800
DHOLPUR C C POWER PROJECT RRVUNL THERMAL-R-LNG 33000 9486 46110
MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 14000 20855 34192
MINI MICRO HYDEL (MMH) P S RRVUNL HYDRO-HYDRO 2385 851 37800
KALISINDH TPP 1 RRVUNL THERMAL-COAL 60000 341543 45000
KALISINDH TPP 2 RRVUNL THERMAL-COAL 60000 211588 45000
KHARA HEP UPJVNL HYDRO-HYDRO 7200 26654 7200
MATATILLA HEP UPJVNL HYDRO-HYDRO 3060 12219 6500
OBRA HEP UPJVNL HYDRO-HYDRO 9900 21517 6300
RIHAND UPJVNL HYDRO-HYDRO 30000 57369 5500
ANPARA A TPS UPRVUNL THERMAL-COAL 63000 317536 27000
ANPARA B TPS UPRVUNL THERMAL-COAL 100000 705605 22700
ANPARA D UPRVUNL THERMAL-COAL 100000 300158 39800
HARDUAGANJ TPS UPRVUNL THERMAL-COAL 16500 45817 49200
HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 50000 304389 46600
OBRA A TPS UPRVUNL THERMAL-COAL 28800 13158 34000
OBRA B TPS UPRVUNL THERMAL-COAL 100000 328124 21900
Page 34
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) PANKI TPS UPRVUNL THERMAL-COAL 21000 66488 50300
PARICHHA TPS UPRVUNL THERMAL-COAL 22000 38762 49400
PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 42000 231931 45600
PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 50000 276722 50400
CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 24000 70845 8290
CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 14400 75366 8390
DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 3375 9595 12080
DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 5100 18701 10520
KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4140 17359 12330
KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 12000 33001 9420
KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 3000 11953 8320
TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 9000 33983 12460
MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 30400 124510 16110
RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 19800 17897 10550
MPUR UTTARAKHAND JVNL HYDRO-HYDRO 930 5121 19200
PATHRI UTTARAKHAND JVNL HYDRO-HYDRO 2040 11636 14200
GALOGI UTTARAKHAND JVNL HYDRO-HYDRO 300 648 12500
PRIVATE SECTOR
MGTPP CLP INDIA PVT LTD THERMAL-COAL 132000 268902 41940
SHRINAGAR HEP ALAKNANDA HPCL HYDRO-HYDRO 33000 127414 48800
GAMA INFRAPROP CCPP GAMA INFRAPROP PVT THERMAL-GAS 22500 52686 47000
PPGCL (BARA) JP POWER VENTURES LTD THERMAL-COAL 198000 448200 38500
MALANA HEP MALANA PCL HYDRO-HYDRO 8600 26354 29792
MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 10000 30369 32580
ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 19200 56347 36079
KASHANG HEP H P PCL HYDRO-HYDRO 19500 5034 29200
BASPA-II HEP HBPCL HYDRO-HYDRO 30000 132769 13600
KARCHAM WANGTOO HEP HBPCL HYDRO-HYDRO 100000 434386 36600
RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 108000 582600 43700
RITHALA COMBI CY POWER PLANT TATA POWER DDL THERMAL-GAS 9480 000 11900
RAJPURA TPS NABHA POWER LTD THERMAL-GAS 140000 901484 39000
TALWANDI SABO POWER LTD TALWANDI SABO POWER LTD THERMAL-COAL 198000 636040 49548
ROJA THERMAL POWER STATION ROJA POWER SCL THERMAL-COAL 120000 727200 43400
KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 34400 63400
BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 36000 62600
MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 38200 60800
UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 37900 61500
KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 42300 58800
LALITPUR PGCL BAJAJ ENERGY PVT LTD THERMAL-COAL 198000 359400 47300
PRAYAGRAJ PGCL PRAYAGRAJ PGCL THERMAL-COAL 132000 448200 38595
KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 132000 783182 33438
WESTERN REGION
CENTRAL SECTOR
INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 100000 325333 23892
OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 52000 141663 34001
GANDHAR CCPP NTPC LTD THERMAL-GAS 65739 221924 28700
KAWAS CCPP NTPC LTD THERMAL-GASN 65620 167929 27000
KORBA I amp II NTPC LTD THERMAL-COAL 210000 1499171 20500
KORBA III NTPC LTD THERMAL-COAL 50000 358746 26600
SIPAT STPS I NTPC LTD THERMAL-COAL 198000 1479902 26800
SIPAT STPS II NTPC LTD THERMAL-COAL 100000 766549 26500
VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 126000 693142 25800
VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 100000 608781 23800
VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 100000 673475 27600
VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 100000 655924 32900
VINDHYACHAL STPS V NTPC LTD THERMAL-COAL 50000 328265 31700
MOUDA I NTPC LTD THERMAL-COAL 100000 343130 44500
MOUDA Ii NTPC LTD THERMAL-COAL 66000 40637 39900
RATNAGIRI GAS amp POWER PVT LTD RGPPL THERMAL-GAS 196708 442485 47000
KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 000 24729
TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 32000 201227 10740
Page 35
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 365122 19069
TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 787444 29324
STATE SECTOR
GSEG-HAZIRA15610 MW GUJARAT S ENEGEN LTD THERMAL-GAS 15610 1805 28200
GSEG-HAZIRA35143 MW GUJARAT S ENEGEN LTD THERMAL-GAS 35130 22276 51300
GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 21978 51800
AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 13929 26100
KORBA TPS EAST CSPGCL THERMAL-COAL 44000 198673 33880
DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 365808 27570
KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 316500 30420
HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 532878 19410
CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 515 58300
MTTPS CHAMPA U-I CSPGCL THERMAL-COAL 50000 220376 39000
MTTPS CHAMPA U-II CSPGCL THERMAL-COAL 50000 23709 10000
SHP GANGREL CSPGCL HYDRO-HYDRO 1000 2350 36790
BANGO HEP CSPGCL HYDRO-HYDRO 12000 14662 8900
MHP KORBA WEST CSPGCL HYDRO-HYDRO 170 859 38190
SIKASAR HEP CSPGCL HYDRO-HYDRO 700 418 26870
DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8843 74500
DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 19446 51500
GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 66388 71600
GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127488 41300
KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 96072 43900
KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 29841 56400
SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 184966 58800
UKAI 1-5 GSECL THERMAL-COAL 85000 204891 46900
UKAI TPS 6 GSECL THERMAL-COAL 50000 284448 48200
WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 271999 58300
WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 82808 44100
KADANA HPS GSECL HYDRO-HYDRO 24200 34433 16800
UKAI HPS GSECL HYDRO-HYDRO 30500 40585 6100
TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 123000 11500
BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 8900 10900
BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 7200 27500
JHINNA HPS MPPGCL HYDRO-HYDRO 2000 9700 18500
RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 44300 3400
GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 17300 4600
SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 4100 16900
MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 14600 27000
PENCH HPS MPPGCL HYDRO-HYDRO 16000 23700 8100
RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 3000 16900
AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 134400 35100
SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 283800 38700
SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 344600 34300
SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 111600 61600
SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 211800 58000
SSTPS PH-I MPPGCL THERMAL-COAL 120000 233100 84300
BHUSAWAL TPS MSPGCL THERMAL-COAL 142000 566258 51100
CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1365682 33700
KHAPERKHEDA MSPGCL THERMAL-COAL 134000 706207 39100
KORADI TPS MSPGCL THERMAL-COAL 62000 443206 42000
NASIK TPS MSPGCL THERMAL-COAL 63000 297275 47000
PARLI TPS MSPGCL THERMAL-COAL 113000 175934 71600
PARAS MSPGCL THERMAL-COAL 50000 267931 38700
URAN CCPP MSPGCL THERMAL-GAS 67200 320330 30600
KOYANA MSPGCL HYDRO-HYDRO 195600 328155 13100
SMALL HYDRO POWER PLANTS MSPGCL HYDRO-HYDRO 45400 93062 30500
BHIRA MSPGCL HYDRO-HYDRO 8000 10046 8400
TILLARI MSPGCL HYDRO-HYDRO 8900 10584 3100
SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 233298 20500
SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 87633 20500
PRIVATE SECTOR
Page 36
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 81282 46750
JNSTPP(JAYPEE NIGRIE) JP POWER VENTURES LTD THERMAL-COAL 132000 726695 29310
MB POWER MB POWER THERMAL-COAL 120000 345632 38310
ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 754922 28671
ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 780761 23495
ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 198000 1263784 32090
ADANI POWER MAHARA ADANI POWER LTD THERMAL-COAL 330000 1666191 34124
AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 170065 36827
SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 252035 45129
ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 458551 36000
ESSAR POWER MP LTD ESSAR POWER MP LTD THERMAL-COAL 60000 243040 28600
VEDANTA LTD (P P -I) VEDANTA LTD THERMAL-GAS 3000 15044 24000
VEDANTA LTD (P P -II) VEDANTA LTD THERMAL-GAS 3000 21293 24000
PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 8234600 24000
165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 5850 64390
145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 68717 40349
SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 132655 28776
SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 144686 38567
MUNDRA UMPPCOASTAL GUJARAT POWER
LTD THERMAL-IMP COAL 400000 2530300
23900
LANCO AMARKANTAK TPP PATHADIH
U-ILANCO AMARKAN POWER LTD THERMAL-COAL 30000 195500
29200
LANCO AMARKANTAK TPP PATHADIH
U-IILANCO AMARKAN POWER LTD THERMAL-COAL 30000 206900
27600
BARADARHA TPS D B POWER LTD THERMAL-COAL 120000 677373 29200
JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 405000 28900
JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 453000 40500
DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 339437 40700
TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 293400 44000
TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 137200 37000
TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 174900 44000
BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 92900 14100
BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23700 34300
KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 27600 48300
CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2530300 23900
BHANDARDRA HEP -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 2475 54900
SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 161400 26500
SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 445000 39000
SOTHERN REGION
CENTRAL SECTOR
NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 325699 54820
NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 305532 39880
NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 998805 38510
NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 113016 54070
NEYVELI TAMILNADU POWER LTD JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 625274 42200
VALLUR TPS NTPC TECL THERMAL-COAL 150000 856438 42350
R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 1493 84300
RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1502919 29400
RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 341291 31800
SIMHADRI I NTPC LTD THERMAL-COAL 100000 688382 36800
SIMHADRI II NTPC LTD THERMAL-COAL 100000 663657 43400
KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 593110 31324
MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 291625 21764
KKNPP-1 amp 2 NPCIL NUCLEAR-NUCLEAR 200000 572609 40948
MINICOY LAKSHADEEP THERMAL-DIESEL 340 770 29600
KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1097 29600
AMINI LAKSHADEEP THERMAL-DIESEL 265 509 29600
ANDROTT LAKSHADEEP THERMAL-DIESEL 219 524 29600
KALPENI LAKSHADEEP THERMAL-DIESEL 175 356 29600
AGATTI LAKSHADEEP THERMAL-DIESEL 195 658 29600
KADMAT LAKSHADEEP THERMAL-DIESEL 190 414 29600
KILTAN LAKSHADEEP THERMAL-DIESEL 150 269 29600
CHETLET LAKSHADEEP THERMAL-DIESEL 100 139 29600
BITRA LAKSHADEEP THERMAL-DIESEL 043 024 29600
BANGARAM LAKSHADEEP THERMAL-DIESEL 018 009 29600
Page 37
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) STATE SECTOR
Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 721811 46500
Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 50000 336142 46500
RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 237358 46500
RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 239926 46500
RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 124500 46500
SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 62109 46500
UPPER SILERU APGENCO HYDRO-HYDRO 24000 33000 46500
LOWER SILERU APGENCO HYDRO-HYDRO 46000 81066 46500
DONKARAI APGENCO HYDRO-HYDRO 2500 6007 46500
PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 1262 46500
CHETTIPETA APGENCO HYDRO-HYDRO 100 214 46500
MUCHKUND APGENCO HYDRO-HYDRO 12000 37571 46500
NAGARJUNASAGAR RCPH APGENCO HYDRO-HYDRO 9000 606 46500
TUNGABHADRA HES amp HAMPI(AP
Share)
APGENCO HYDRO-HYDRO 7200 6100 46500
KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 352232 42600
KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 288131 32500
KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 319272 46500
RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 40073 44300
KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 308317 46000
KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 308963 51300
SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 61004 76600
NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 17960 75300
PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 20873 58300
POCHAMPAD-I TSPGENCO HYDRO-HYDRO 2700 5455 29800
POCHAMPAD-II TSPGENCO HYDRO-HYDRO 900 1932 40700
NIZAMSAGAR TSPGENCO HYDRO-HYDRO 1000 1126 53400
RAICHUR TPS 1 to 7 KPCL THERMAL-COAL 147000 890866 43800
RAICHUR TPS 8 KPCL THERMAL-COAL 25000 159523 48200
BELLARI TPS 1 KPCL THERMAL-COAL 50000 318679 51100
BELLARI TPS 2 KPCL THERMAL-COAL 50000 232347 55600
BELLARI TPS 3 KPCL THERMAL-COAL 70000 47565 34400
BHADRA PH KPCL HYDRO-HYDRO 3920 2369 45900
GERUSUPPA PH KPCL HYDRO-HYDRO 24000 26990 22000
GHAT PRABHA HEP KPCL HYDRO-HYDRO 3200 4777 25300
KADRA HPS KPCL HYDRO-HYDRO 15000 16889 26800
NAGJHARI KPCL HYDRO-HYDRO 90000 155159 9800
KODASALLI DPH KPCL HYDRO-HYDRO 12000 14854 19200
MUNIRA+MGH+SPH+SPH KPCL HYDRO-HYDRO 22640 48211 7900
SHARAVATHY HPS KPCL HYDRO-HYDRO 108550 276215 5400
ALMATTI DPH KPCL HYDRO-HYDRO 29000 39611 24600
VARAHI UGPH KPCL HYDRO-HYDRO 46000 71368 15600
IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 17196 15300
IDUKKI HPS KSEB HYDRO-HYDRO 78000 137905 15300
KAKKAD HPS KSEB HYDRO-HYDRO 5000 13063 15300
KALLADA HPS KSEB HYDRO-HYDRO 1500 4436 15300
KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 46544 15300
KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 635 15300
LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 30822 15300
MALANKARA HPS KSEB HYDRO-HYDRO 1050 2474 15300
MATTUPETTY KSEB HYDRO-HYDRO 200 230 15300
MALAMPUZHA KSEB HYDRO-HYDRO 250 063 15300
CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 864 15300
URUMI ST I amp II KSEB HYDRO-HYDRO 615 903 15300
LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 248 15300
NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7765 19625 15300
PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 16601 15300
PANNIAR HPS KSEB HYDRO-HYDRO 3240 6217 15300
PORINGALKUTHU KSEB HYDRO-HYDRO 3600 10052 15300
PORINGALKUTHU LBE KSEB HYDRO-HYDRO 1600 9438 15300
PEPPARA KSEB HYDRO-HYDRO 300 395 15300
POOZHITHODE KSEB HYDRO-HYDRO 480 1045 15300
Page 38
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) PEECHI KSEB HYDRO-HYDRO 125 040 15300
RANI-PERUNADU KSEB HYDRO-HYDRO 400 585 15300
SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 79783 15300
SENGULAM HPS KSEB HYDRO-HYDRO 5120 11558 15300
SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 16711 15300
VILANGAD KSEB HYDRO-HYDRO 750 1578 15300
BARAPOLE KSEB HYDRO-HYDRO 1500 1932 15300
VELLATHOOVAL KSEB HYDRO-HYDRO 360 305 15300
CHIM0NY KSEB HYDRO-HYDRO 250 156 15300
ADYANPARA KSEB HYDRO-HYDRO 350 501 15300
BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 554 15300
KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 3801 15300
KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 23132 32800
ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 14416 62280
METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 523970 62280
METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 321270 62280
NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 336575 62280
NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 591240 62280
TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 508966 62280
KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 30897 62280
VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 18720 90699 62280
KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 33593 62280
BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 1047 62280
PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 1250 62280
PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 330 62280
MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 4897 62280
MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 032 62280
KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15681 62280
KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 40608 62280
KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 21342 62280
KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 4717 62280
KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4322 62280
KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2399 62280
METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 4416 62280
METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 8035 62280
BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2187 62280
BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2359 62280
BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2511 62280
BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 1949 62280
BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 1819 62280
POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 172 62280
SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 241 62280
MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 026 62280
THIRUMOORTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 136 62280
PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 9309 62280
VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 353 62280
SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 4192 62280
PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 6571 62280
SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 1186 62280
SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6319 62280
ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 6122 62280
KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 28674 62280
SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 18381 62280
SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 4258 62280
KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 12680 62280
KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4201 62280
ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 000 62280
PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 19175 62280
AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 078 62280
BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 504 62280
BHAVANI KATTALAI (BKB)(IIIampIII BB I amp II)TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 5847 62280
PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 000 62280
Page 39
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) SRI DAMODARAM STPS APPDCL THERMAL-COAL 160000 808108 36300
PRIVATE SECTOR
KARUPPUR TANJORE LANCO TANJORE PCL THERMAL-GAS 12000 48096 28770
SIMHAPURI ENERGY LTD SIMHAPURI ENERGY LTD THERMAL-COAL 60000 143900 39100
JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 7111 45500
SBU 1 JSW ENERGY LTD
VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 26000 159100
43300
SBU 2 JSW ENERGY LTD
VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 60000 247900
42800
LANCO KPLLANCO KONDAPALLI POWER
LTDTHERMAL-GAS 36814 85060
25776
LANCO KPL STG -IILANCO KONDAPALLI POWER
LTDTHERMAL-GAS 36600 12979
46330
LANCO KPL STG -IIIALANCO KONDAPALLI POWER
LTDTHERMAL-GAS 37100 85710
46330
LANCO KPL STG -III BLANCO KONDAPALLI POWER
LTDTHERMAL-GAS 37100 43639
46330
HINDUJA NATIONAL PCL HINDUJA NATIONAL PCL THERMAL-COAL 104000 303000 38200
MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 121164 49940
UDUPI POWER COR LTD ADANI POWER LTD THERMAL-COAL 120000 754613 42500
SPECTRUM POWER GENERATION
LTD SPECTRUM PG LTD THERMAL-GASN 20525 9256812
34952
TAQA NEYVELI POWER COM PVT
LTD TAQA NEYVELI THERMAL-LIG 25000 5840
34500
ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 251000 51000
ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 207860 36800
GMR VEMAGIRI POWER GENERATION
LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 30117
46450
EASTERN REGION
CENTRAL SECTOR
MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 64675 53113
MTPS STAGE - II KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 39000 1432 69138
BOKARO `B` TPS DVC THERMAL-COAL 63000 145670 31539
MEJIA TPS U 1-3 DVC THERMAL-COAL 63000 348298 31552
MEJIA TPS U 4 DVC THERMAL-COAL 21000 116099 34997
MEJIA TPS U 5-6 DVC THERMAL-COAL 50000 276427 35976
MEJIA TPS U 7-8 DVC THERMAL-COAL 100000 552854 36991
DURGAPUR STEEL TPS DVC THERMAL-COAL 100000 665550 39323
DURGAPUR TPS DVC THERMAL-COAL 21000 59270 35416
RAGHUNATHPUR TPS DVC THERMAL-COAL 120000 201650 35326
MAITHON HYDEL STA DVC HYDRO-HYDRO 6320 12200 17984
CHANDRAPURA TPSU1-3 DVC THERMAL-COAL 42000 257610 35095
CHANDRAPURA TPSU7-8 DVC THERMAL-COAL 50000 306673 34987
KODERMA TPS DVC THERMAL-COAL 100000 380180 38131
PANCHET HPS DVC HYDRO-HYDRO 8000 13360 17984
TILLAYA HPS DVC HYDRO-HYDRO 400 1410 17984
RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34700 35400
TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 277300 23200
TLDP -III NHPC LTD HYDRO-HYDRO 13200 55400 62000
TLDP -IV NHPC LTD HYDRO-HYDRO 16000 60300 25600
FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 957219 33700
FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 308943 41000
BONGAINGAON TPS NTPC LTD THERMAL-COAL 25000 153663 58600
KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 542277 34200
KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 942591 34200
BARH-II NTPC LTD THERMAL-COAL 132000 728021 44500
TALCHER TPS NTPC LTD THERMAL-COAL 46000 335521 30100
TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 702319 25600
TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1436521 24700
STATE SECTOR
BTPS(RampM) BIHAR STATE PGCL THERMAL-COAL 22000 12142 39700
BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 98331 10602
HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 50593 9482
CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 19689 2605
RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 53192 6033
UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 147208 14637
Page 40
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 60353 4519
IB TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 288567 25000
J P H GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 210 038 61100
MEYONG CHU GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 400 1086 61100
TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 122667 38200
DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 214339 43321
KOLAGHAT THERMAL POWER
STATION
WEST BENGAL PDCL THERMAL-COAL 126000 538269 31603
BAKRESHWAR THERMAL POWER
PLANT
WEST BENGAL PDCL THERMAL-COAL 105000 634876 32154
BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 45000 166855 33299
SANTHALDIH THERMAL POWER
STATION
WEST BENGAL PDCL THERMAL-COAL 50000 336442 34932
SAGARDIGHI THERMAL POWER
PROJECT
WEST BENGAL PDCL THERMAL-COAL 160000 423121 34705
JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 20344 68900
RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 24559 68900
TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 4623 68900
PURULIA PUMPED STORAGE
PROJECT
WEST BENGAL SEDCL HYDRO-HYDRO 90000 108816 68900
MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2768 68900
PRIVATE SECTOR
CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 49474 20230
CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 555500 70200
HALDIA ENERGY HALDIA ENERGY LTD THERMAL-COAL 60000 371000 50400
DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3688 63400
KAMALANGA TPS GMR KAMALANGA ENERGY LTD THERMAL-COAL 105000547670
33300
ADHUNIK POWER U-1 ADHUNIK POWER THERMAL-COAL 27000 158 44060
ADHUNIK POWER U-2 ADHUNIK POWER THERMAL-COAL 27000 168 44250
VL-JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 332800 23622
JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 43000 45250
JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 71700 37030
JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 70700 35920
JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 71100 38870
JOJOBERA UNIT 5 TATA POWER COM LTD THERMAL-COAL 12000 79300 44560
JOJOBERA UNIT 6 TATA POWER COM LTD THERMAL-WHR 12000 83700 12840
IEL KALINGANAGAR U-I TATA POWER COM LTD THERMAL-WG 6750 33400 22500
IEL KALINGANAGAR U-II TATA POWER COM LTD THERMAL-WG 6750 34800 22500
MAITHON UNIT 1 amp 2 TATA POWER COM LTD THERMAL-COAL 105000 678000 36100
HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 27500 24340
HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 28400 24340
HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 15800 24310
NORTH EASTERN REGION
CENTRAL SECTOR
LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 74100 36600
AGARTALA GT NEEPCO THERMAL-GAS 13500 88611 27210
ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 153111 32310
DOYANG HEP NEEPCO HYDRO-HYDRO 7500 25598 49801
KOPILI HEP NEEPCO HYDRO-HYDRO 20000 98186 11491
KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 19582 20237
KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 10310 17968
RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 124093 22945
TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 10100 17344 39000
STATE SECTOR
HYDRO POWER (122 Stns) ITANAGAR GOVT OF ARUNACHAL
PRADESHHYDRO-HYDRO 6971 6217270
24600
KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39514 17337
LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 82327 36810
NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 33318 48290
MYNTRIANG SHEP ST II ASSAM POWER GENCO HYDRO-HYDRO 300 567 35776
LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 9130 49200
LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 012 49200
DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 022 49200
TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 000 49200
UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 4990 16000
UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 6476 37000
UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 16494 14600
UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 3600 9556 15000
SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 758 8000
MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44070 44800
KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 154 41400
TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 091 41400
MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 411 41400
MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 394 41400
KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 760 41400
SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 3264 41400
LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 044 41400
BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 18953 28000
ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 43585 28200
GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 4080 11100
Note
LIG Lignite N Naptha WHR Waste Heat Recovery
Page 41
File NoCEA-CH-14-1142018-Coordination Division
Progress of Transmission Sector in the Country up to Oct 2018
1 TRANSMISSION LINES (All fig in CKM)
At the end of
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
6th plan 0 0 0 0 0 0 0 0 0 0 0 0 1831 4198 0 6029 1641 44364 0 46005 3472 48562 0 52034
7th plan 0 0 0 0 0 0 0 0 0 0 0 0 13068 6756 0 19824 4560 55071 0 59631 17628 61827 0 79455
8th plan 0 0 0 0 1634 0 0 1634 0 0 0 0 23001 13141 0 36142 6564 73036 0 79600 31199 86177 0 117376
9th plan 0 0 0 0 3234 1504 0 4738 751 409 0 1160 29345 20033 0 49378 8687 88306 0 96993 42017 110252 0 152269
10th plan 0 0 0 0 4368 1504 0 5872 1775 409 0 2184 48708 24730 0 73438 9444 105185 0 114629 64295 131828 0 196123
11th Plan 0 0 0 0 5948 1504 1980 9432 4839 411 0 5250 71023 30191 5605 106819 10140 125010 830 135980 91950 157116 8415 257481
12th Plan 6124 0 0 6124 5948 1504 1980 9432 25465 1177 4598 31240 92482 48240 17065 157787 11014 151276 978 163268 141033 202197 24621 367851
13th Plan (Up
to Mar2018)6124 0 0 6124 5948 1504 1980 9432 28666 1512 4881 35059 98247 54286 19067 171600 11258 156497 1000 168755 150243 213799 26928 390970
13th Plan (Up
to Sep-18)6124 0 0 6124 5948 1504 1980 9432 30952 1512 5059 37523 99683 56069 20662 176414 11318 160958 1000 173276 154025 220043 28701 402769
27150
75050
47900
118050
90650
30
IR addition in 12th Plan (up to
March 2017)
Total IR (up to Oct-18)
IR at the end of 11th Plan
IR at the end of 12th Plan
Envisaged IR Capacity at the end
of 13th Plan
Grand Total
Note - The figure upto the end of 10th plan in for stringing progress including the lines not commissioned Now only commissioned lines are reckoned Accordingly the figure for 10th plan (end) may read as 187555 after adjusting with (-) 10852 Ckm
Inter-regional Power Transfer Capacity
plusmn 800 kV HVDC plusmn 500 kV HVDC 765 kV 400 kV 220 kV
File NoCEA-CH-14-1142018-Coordination Division
2004-05 27800
2005-06 28100
2006-07 30200
2007-08 33000
2008-09 35500
2009-10 36700
2010-11 38700
2011-12 41756
2012-13 45460
2013-14 48940
2014-15 53040
2015-16 54590
2016-17 57430
2017-18 60800
Year
2005-06
2006-07
2007-08
2008-09
2009-10
2010-11
2011-12
2012-13
2013-14
2014-15
2015-16
2016-17
2017-18
2004-05 254 209 7568
2005-06 260 221 7636
2006-07 276 227 7423
2007-08 293 239 7727
2008-09 340 263 8713
2009-10 355 268 8870
2010-11 398 303 11975
2011-12 455 330 13514
2012-13 501 376 14867
2013-14 518 175
2014-15 520
6719
7171
3 All India yearly Coal Consumption for Power Generation (Utilities)
YEARCoal Consumption
Million Tonnes
4 All India Annual per Capita consumption of Electricity Since 2006
Per Capita Consumption ( kWh)
6314
(GrossGen+ Net Import) Mid-year population
5 Average cost of power supply amp average realization ( paiseKWH )
Yearcost of supply
(paiseunit)
Realization(paiseunit)
Including AgricultureOnly
Agriculture
1149
7335
7786
91441
8188
88363
957
1010
1075
1122
File NoCEA-CH-14-1142018-Coordination Division
Source- PFC Reports on the performance of State Power Utilities 31
File NoCEA-CH-14-1142018-Coordination Division
Sl
NoExecuting Agency
Installed
Capacity (MW)Cost (Rs crore)
Date of
Clearance
32
No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification
since 2004-05
65291374575 296361511th Plan
Cumu upto End of 11th Plan
596556 21212860
557439Cummulative up to end of 12th Plan
46708
18423975
499150
2003-042004-05
5743
9769
Cumu upto End of 10th Plan
010407 to 310308
010410 to 310311557976840909
010411 to 310312
412667
86293726
3207
482864
12632
1576036
4451722594
15455554
2314176
397343611750
2093311060316074
65109527813884
6 Growth Of Rural Electrification amp Pumpsets Energisation
Plan Year
9th Plan2002-03
134092626
4111
Pump Sets Energised Villages Electricfied (Nos)
2001-02
284064367244
1218
27801997-981998-991999-002000-01
297594
010408 to 310309010409 to 310310
10th Plan
2005-062006-07
322968331020
Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as
Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received
from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made
available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified
villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is
independent of the earlier published reports
No Hydro Electric Project has been issued concurrenceAppraisal letter by CEA during October 2018
7 Status of Hydro Schemes Cleared by the CEA in Oct-2018
Name of Scheme
File NoCEA-CH-14-1142018-Coordination Division
SN Contents Page
1 Rate of sale of power for the year 2016-17 33-41
RATE OF SALE OF POWER FOR THE YEAR 2016-17
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) NORTHERN REGION
CENTRAL SECTOR
BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 18000 66900 19800
CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 54000 222400 21600
CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 30000 144400 19600
CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 23100 91700 42600
PARBATI - III HPS NHPC LTD HYDRO-HYDRO 52000 68200 54800
DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 28000 95600 30000
CHUTAK NHPC LTD HYDRO-HYDRO 4400 22000 79800
DULHASTI HPS NHPC LTD HYDRO-HYDRO 39000 228000 56400
SALAL HPS NHPC LTD HYDRO-HYDRO 69000 342300 11000
TANAKPUR HPS NHPC LTD HYDRO-HYDRO 9420 43000 29600
URI HPS -I NHPC LTD HYDRO-HYDRO 48000 280300 16000
URI HPS - II NHPC LTD HYDRO-HYDRO 24000 147300 48600
NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 4500 24600 88200
SEWA - II NHPC LTD HYDRO-HYDRO 12000 47100 43400
ANTA CCPP NTPC LTD THERMAL-GASN 41930 67539 32400
AURAIYA CCPP NTPC LTD THERMAL-GASN 66336 53501 39100
BADARPUR TPS NTPC LTD THERMAL-COAL 70500 159153 44800
DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 84000 296170 42300
DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 98000 526686 46300
DADRI CCPP NTPC LTD THERMAL-GASHSD 82978 227469 33000
FARIDABAD CCPP NTPC LTD THERMAL-GASN 43159 115577 30800
RIHAND STPS I NTPC LTD THERMAL-COAL 100000 596766 24500
RIHAND STPS II NTPC LTD THERMAL-COAL 100000 737069 24600
RIHAND STPS III NTPC LTD THERMAL-COAL 100000 706546 30600
SINGRAULI STPS NTPC LTD THERMAL-COAL 200000 1394068 20400
TANDA TPS NTPC LTD THERMAL-COAL 44000 295438 40800
UNCHAHAR TPS I NTPC LTD THERMAL-COAL 42000 256454 39800
UNCHAHAR TPS II NTPC LTD THERMAL-COAL 42000 273577 38900
UNCHAHAR TPS III NTPC LTD THERMAL-COAL 21000 142780 43000
KOLDAM NTPC LTD HYDRO-HYDRO 80000 363260 43600
NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 303575 25841
RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 108000 668677 35374
NJHPS SJVNL HYDRO-HYDRO 150000 699496 23820
RAMPUR HPS SJVNL HYDRO-HYDRO 41202 195982 32260
TEHRI HPP THDC HYDRO-HYDRO 100000 272543 51800
KOTESHWAR HEP THDC HYDRO-HYDRO 40000 106244 53400
IGSTPS JHAJJAR ARAVALI P CPL THERMAL-COAL 150000 510429 49490
NEYVELI BARSINGSAR NEYVELI LIG CORP LTD THERMAL-LIG 25000 127520 38040
STATE SECTOR
PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 21000 14222 48200
PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 21000 19205 48400
PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 25000 102257 42600
PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 25000 62107 41800
DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 60000 312213 41000
RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 120000 35767442200
WYC HYDEL STATION HPGCL HYDRO-HYDRO 6240 20365 24900
GIRI POWER HOUSE HPSEB HYDRO-HYDRO 6000 13958 7600
ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 1695 5467 11900
BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 12000 18528 6700
GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 2250 7462 22500
BASSI POWER HOUSE HPSEB HYDRO-HYDRO 6600 29649 7500
BINWA POWER HOUSE HPSEB HYDRO-HYDRO 600 2749 19300
ANNEXURE-I
RATE OF SALE OF POWER FOR THE YEAR 2016-2017
Page 33
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) GAJ POWER HOUSE HPSEB HYDRO-HYDRO 1050 2914 26700
BANER POWER HOUSE HPSEB HYDRO-HYDRO 1200 2864 16200
HOLI POWER HOUSE HPSEB HYDRO-HYDRO 300 616 22500
THIROT POWER HOUSE HPSEB HYDRO-HYDRO 450 1126 22500
KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 1200 3064 22500
LARJI POWER HOUSE HPSEB HYDRO-HYDRO 12600 53677 23700
NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 250 750 31000
CHABA POWER HOUSE HPSEB HYDRO-HYDRO 175 465 23300
RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 150 101 13400
SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 200 000 22500
KILLAR HPSEB HYDRO-HYDRO 030 050 22500
BHABA AUGUMENP H HPSEB HYDRO-HYDRO 450 1276 22500
BS CHAMBA HPSEB HYDRO-HYDRO 045 099 19500
GUMMA HPSEB HYDRO-HYDRO 300 423 22500
GAS TURBINE POWER STATION IPGCL THERMAL-GAS 27000 67233 39300
PPS-I PPCL THERMAL-GAS 33000 175905 38300
PPS-III PPCL THERMAL-GAS 137120 196879 36100
LOWER JHELUM JampKPDD HYDRO-HYDRO 10500 60214 5100
UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 2260 10514 6300
UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 10500 44202 8500
GANDHARBAL JampKPDD HYDRO-HYDRO 1500 8925 4700
KARNAH MPH JampKPDD HYDRO-HYDRO 200 1122 31000
CHENANI I JampKPDD HYDRO-HYDRO 2330 10892 6600
CHENANI II JampKPDD HYDRO-HYDRO 200 1188 9300
CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 750 3634 14200
IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 375 2108 18500
IGO MERCHELLONG JampKPDD HYDRO-HYDRO 300 1572 29700
PAHALGAM MHP JampKPDD HYDRO-HYDRO 450 1713 32900
MARPACHOO JampKPDD HYDRO-HYDRO 075 375 29800
HAFTAL JampKPDD HYDRO-HYDRO 100 483 28700
SANJAK JampKPDD HYDRO-HYDRO 126 441 36000
SEWA-III JampKPDD HYDRO-HYDRO 900 3273 20200
BHADERWAH JampKPDD HYDRO-HYDRO 150 935 8900
BAZGO JampKPDD HYDRO-HYDRO 030 108 33300
SUMOOR JampKPDD HYDRO-HYDRO 010 045 35400
HUNDER JampKPDD HYDRO-HYDRO 040 176 26200
STAKNA JampKPDD HYDRO-HYDRO 400 1933 4100
KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 124000 662879 31360
SURATGARH TPS RRVUNL THERMAL-COAL 150000 402328 41730
CHHABRA TPS 1amp 2 RRVUNL THERMAL-COAL 50000 305946 36700
CHHABRA TPS 3 RRVUNL THERMAL-COAL 25000 151536 36700
CHHABRA TPS 4 RRVUNL THERMAL-COAL 25000 155896 36700
RAMGARH GT POWER PROJECT RRVUNL THERMAL-COAL 22050 43177 41800
RAMGARH GAS T P PROJECT 3 RRVUNL THERMAL-GAS 5000 93615 41800
DHOLPUR C C POWER PROJECT RRVUNL THERMAL-R-LNG 33000 9486 46110
MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 14000 20855 34192
MINI MICRO HYDEL (MMH) P S RRVUNL HYDRO-HYDRO 2385 851 37800
KALISINDH TPP 1 RRVUNL THERMAL-COAL 60000 341543 45000
KALISINDH TPP 2 RRVUNL THERMAL-COAL 60000 211588 45000
KHARA HEP UPJVNL HYDRO-HYDRO 7200 26654 7200
MATATILLA HEP UPJVNL HYDRO-HYDRO 3060 12219 6500
OBRA HEP UPJVNL HYDRO-HYDRO 9900 21517 6300
RIHAND UPJVNL HYDRO-HYDRO 30000 57369 5500
ANPARA A TPS UPRVUNL THERMAL-COAL 63000 317536 27000
ANPARA B TPS UPRVUNL THERMAL-COAL 100000 705605 22700
ANPARA D UPRVUNL THERMAL-COAL 100000 300158 39800
HARDUAGANJ TPS UPRVUNL THERMAL-COAL 16500 45817 49200
HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 50000 304389 46600
OBRA A TPS UPRVUNL THERMAL-COAL 28800 13158 34000
OBRA B TPS UPRVUNL THERMAL-COAL 100000 328124 21900
Page 34
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) PANKI TPS UPRVUNL THERMAL-COAL 21000 66488 50300
PARICHHA TPS UPRVUNL THERMAL-COAL 22000 38762 49400
PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 42000 231931 45600
PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 50000 276722 50400
CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 24000 70845 8290
CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 14400 75366 8390
DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 3375 9595 12080
DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 5100 18701 10520
KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4140 17359 12330
KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 12000 33001 9420
KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 3000 11953 8320
TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 9000 33983 12460
MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 30400 124510 16110
RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 19800 17897 10550
MPUR UTTARAKHAND JVNL HYDRO-HYDRO 930 5121 19200
PATHRI UTTARAKHAND JVNL HYDRO-HYDRO 2040 11636 14200
GALOGI UTTARAKHAND JVNL HYDRO-HYDRO 300 648 12500
PRIVATE SECTOR
MGTPP CLP INDIA PVT LTD THERMAL-COAL 132000 268902 41940
SHRINAGAR HEP ALAKNANDA HPCL HYDRO-HYDRO 33000 127414 48800
GAMA INFRAPROP CCPP GAMA INFRAPROP PVT THERMAL-GAS 22500 52686 47000
PPGCL (BARA) JP POWER VENTURES LTD THERMAL-COAL 198000 448200 38500
MALANA HEP MALANA PCL HYDRO-HYDRO 8600 26354 29792
MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 10000 30369 32580
ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 19200 56347 36079
KASHANG HEP H P PCL HYDRO-HYDRO 19500 5034 29200
BASPA-II HEP HBPCL HYDRO-HYDRO 30000 132769 13600
KARCHAM WANGTOO HEP HBPCL HYDRO-HYDRO 100000 434386 36600
RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 108000 582600 43700
RITHALA COMBI CY POWER PLANT TATA POWER DDL THERMAL-GAS 9480 000 11900
RAJPURA TPS NABHA POWER LTD THERMAL-GAS 140000 901484 39000
TALWANDI SABO POWER LTD TALWANDI SABO POWER LTD THERMAL-COAL 198000 636040 49548
ROJA THERMAL POWER STATION ROJA POWER SCL THERMAL-COAL 120000 727200 43400
KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 34400 63400
BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 36000 62600
MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 38200 60800
UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 37900 61500
KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 42300 58800
LALITPUR PGCL BAJAJ ENERGY PVT LTD THERMAL-COAL 198000 359400 47300
PRAYAGRAJ PGCL PRAYAGRAJ PGCL THERMAL-COAL 132000 448200 38595
KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 132000 783182 33438
WESTERN REGION
CENTRAL SECTOR
INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 100000 325333 23892
OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 52000 141663 34001
GANDHAR CCPP NTPC LTD THERMAL-GAS 65739 221924 28700
KAWAS CCPP NTPC LTD THERMAL-GASN 65620 167929 27000
KORBA I amp II NTPC LTD THERMAL-COAL 210000 1499171 20500
KORBA III NTPC LTD THERMAL-COAL 50000 358746 26600
SIPAT STPS I NTPC LTD THERMAL-COAL 198000 1479902 26800
SIPAT STPS II NTPC LTD THERMAL-COAL 100000 766549 26500
VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 126000 693142 25800
VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 100000 608781 23800
VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 100000 673475 27600
VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 100000 655924 32900
VINDHYACHAL STPS V NTPC LTD THERMAL-COAL 50000 328265 31700
MOUDA I NTPC LTD THERMAL-COAL 100000 343130 44500
MOUDA Ii NTPC LTD THERMAL-COAL 66000 40637 39900
RATNAGIRI GAS amp POWER PVT LTD RGPPL THERMAL-GAS 196708 442485 47000
KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 000 24729
TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 32000 201227 10740
Page 35
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 365122 19069
TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 787444 29324
STATE SECTOR
GSEG-HAZIRA15610 MW GUJARAT S ENEGEN LTD THERMAL-GAS 15610 1805 28200
GSEG-HAZIRA35143 MW GUJARAT S ENEGEN LTD THERMAL-GAS 35130 22276 51300
GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 21978 51800
AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 13929 26100
KORBA TPS EAST CSPGCL THERMAL-COAL 44000 198673 33880
DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 365808 27570
KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 316500 30420
HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 532878 19410
CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 515 58300
MTTPS CHAMPA U-I CSPGCL THERMAL-COAL 50000 220376 39000
MTTPS CHAMPA U-II CSPGCL THERMAL-COAL 50000 23709 10000
SHP GANGREL CSPGCL HYDRO-HYDRO 1000 2350 36790
BANGO HEP CSPGCL HYDRO-HYDRO 12000 14662 8900
MHP KORBA WEST CSPGCL HYDRO-HYDRO 170 859 38190
SIKASAR HEP CSPGCL HYDRO-HYDRO 700 418 26870
DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8843 74500
DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 19446 51500
GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 66388 71600
GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127488 41300
KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 96072 43900
KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 29841 56400
SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 184966 58800
UKAI 1-5 GSECL THERMAL-COAL 85000 204891 46900
UKAI TPS 6 GSECL THERMAL-COAL 50000 284448 48200
WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 271999 58300
WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 82808 44100
KADANA HPS GSECL HYDRO-HYDRO 24200 34433 16800
UKAI HPS GSECL HYDRO-HYDRO 30500 40585 6100
TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 123000 11500
BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 8900 10900
BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 7200 27500
JHINNA HPS MPPGCL HYDRO-HYDRO 2000 9700 18500
RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 44300 3400
GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 17300 4600
SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 4100 16900
MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 14600 27000
PENCH HPS MPPGCL HYDRO-HYDRO 16000 23700 8100
RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 3000 16900
AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 134400 35100
SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 283800 38700
SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 344600 34300
SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 111600 61600
SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 211800 58000
SSTPS PH-I MPPGCL THERMAL-COAL 120000 233100 84300
BHUSAWAL TPS MSPGCL THERMAL-COAL 142000 566258 51100
CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1365682 33700
KHAPERKHEDA MSPGCL THERMAL-COAL 134000 706207 39100
KORADI TPS MSPGCL THERMAL-COAL 62000 443206 42000
NASIK TPS MSPGCL THERMAL-COAL 63000 297275 47000
PARLI TPS MSPGCL THERMAL-COAL 113000 175934 71600
PARAS MSPGCL THERMAL-COAL 50000 267931 38700
URAN CCPP MSPGCL THERMAL-GAS 67200 320330 30600
KOYANA MSPGCL HYDRO-HYDRO 195600 328155 13100
SMALL HYDRO POWER PLANTS MSPGCL HYDRO-HYDRO 45400 93062 30500
BHIRA MSPGCL HYDRO-HYDRO 8000 10046 8400
TILLARI MSPGCL HYDRO-HYDRO 8900 10584 3100
SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 233298 20500
SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 87633 20500
PRIVATE SECTOR
Page 36
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 81282 46750
JNSTPP(JAYPEE NIGRIE) JP POWER VENTURES LTD THERMAL-COAL 132000 726695 29310
MB POWER MB POWER THERMAL-COAL 120000 345632 38310
ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 754922 28671
ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 780761 23495
ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 198000 1263784 32090
ADANI POWER MAHARA ADANI POWER LTD THERMAL-COAL 330000 1666191 34124
AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 170065 36827
SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 252035 45129
ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 458551 36000
ESSAR POWER MP LTD ESSAR POWER MP LTD THERMAL-COAL 60000 243040 28600
VEDANTA LTD (P P -I) VEDANTA LTD THERMAL-GAS 3000 15044 24000
VEDANTA LTD (P P -II) VEDANTA LTD THERMAL-GAS 3000 21293 24000
PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 8234600 24000
165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 5850 64390
145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 68717 40349
SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 132655 28776
SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 144686 38567
MUNDRA UMPPCOASTAL GUJARAT POWER
LTD THERMAL-IMP COAL 400000 2530300
23900
LANCO AMARKANTAK TPP PATHADIH
U-ILANCO AMARKAN POWER LTD THERMAL-COAL 30000 195500
29200
LANCO AMARKANTAK TPP PATHADIH
U-IILANCO AMARKAN POWER LTD THERMAL-COAL 30000 206900
27600
BARADARHA TPS D B POWER LTD THERMAL-COAL 120000 677373 29200
JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 405000 28900
JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 453000 40500
DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 339437 40700
TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 293400 44000
TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 137200 37000
TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 174900 44000
BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 92900 14100
BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23700 34300
KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 27600 48300
CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2530300 23900
BHANDARDRA HEP -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 2475 54900
SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 161400 26500
SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 445000 39000
SOTHERN REGION
CENTRAL SECTOR
NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 325699 54820
NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 305532 39880
NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 998805 38510
NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 113016 54070
NEYVELI TAMILNADU POWER LTD JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 625274 42200
VALLUR TPS NTPC TECL THERMAL-COAL 150000 856438 42350
R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 1493 84300
RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1502919 29400
RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 341291 31800
SIMHADRI I NTPC LTD THERMAL-COAL 100000 688382 36800
SIMHADRI II NTPC LTD THERMAL-COAL 100000 663657 43400
KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 593110 31324
MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 291625 21764
KKNPP-1 amp 2 NPCIL NUCLEAR-NUCLEAR 200000 572609 40948
MINICOY LAKSHADEEP THERMAL-DIESEL 340 770 29600
KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1097 29600
AMINI LAKSHADEEP THERMAL-DIESEL 265 509 29600
ANDROTT LAKSHADEEP THERMAL-DIESEL 219 524 29600
KALPENI LAKSHADEEP THERMAL-DIESEL 175 356 29600
AGATTI LAKSHADEEP THERMAL-DIESEL 195 658 29600
KADMAT LAKSHADEEP THERMAL-DIESEL 190 414 29600
KILTAN LAKSHADEEP THERMAL-DIESEL 150 269 29600
CHETLET LAKSHADEEP THERMAL-DIESEL 100 139 29600
BITRA LAKSHADEEP THERMAL-DIESEL 043 024 29600
BANGARAM LAKSHADEEP THERMAL-DIESEL 018 009 29600
Page 37
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) STATE SECTOR
Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 721811 46500
Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 50000 336142 46500
RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 237358 46500
RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 239926 46500
RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 124500 46500
SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 62109 46500
UPPER SILERU APGENCO HYDRO-HYDRO 24000 33000 46500
LOWER SILERU APGENCO HYDRO-HYDRO 46000 81066 46500
DONKARAI APGENCO HYDRO-HYDRO 2500 6007 46500
PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 1262 46500
CHETTIPETA APGENCO HYDRO-HYDRO 100 214 46500
MUCHKUND APGENCO HYDRO-HYDRO 12000 37571 46500
NAGARJUNASAGAR RCPH APGENCO HYDRO-HYDRO 9000 606 46500
TUNGABHADRA HES amp HAMPI(AP
Share)
APGENCO HYDRO-HYDRO 7200 6100 46500
KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 352232 42600
KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 288131 32500
KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 319272 46500
RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 40073 44300
KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 308317 46000
KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 308963 51300
SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 61004 76600
NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 17960 75300
PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 20873 58300
POCHAMPAD-I TSPGENCO HYDRO-HYDRO 2700 5455 29800
POCHAMPAD-II TSPGENCO HYDRO-HYDRO 900 1932 40700
NIZAMSAGAR TSPGENCO HYDRO-HYDRO 1000 1126 53400
RAICHUR TPS 1 to 7 KPCL THERMAL-COAL 147000 890866 43800
RAICHUR TPS 8 KPCL THERMAL-COAL 25000 159523 48200
BELLARI TPS 1 KPCL THERMAL-COAL 50000 318679 51100
BELLARI TPS 2 KPCL THERMAL-COAL 50000 232347 55600
BELLARI TPS 3 KPCL THERMAL-COAL 70000 47565 34400
BHADRA PH KPCL HYDRO-HYDRO 3920 2369 45900
GERUSUPPA PH KPCL HYDRO-HYDRO 24000 26990 22000
GHAT PRABHA HEP KPCL HYDRO-HYDRO 3200 4777 25300
KADRA HPS KPCL HYDRO-HYDRO 15000 16889 26800
NAGJHARI KPCL HYDRO-HYDRO 90000 155159 9800
KODASALLI DPH KPCL HYDRO-HYDRO 12000 14854 19200
MUNIRA+MGH+SPH+SPH KPCL HYDRO-HYDRO 22640 48211 7900
SHARAVATHY HPS KPCL HYDRO-HYDRO 108550 276215 5400
ALMATTI DPH KPCL HYDRO-HYDRO 29000 39611 24600
VARAHI UGPH KPCL HYDRO-HYDRO 46000 71368 15600
IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 17196 15300
IDUKKI HPS KSEB HYDRO-HYDRO 78000 137905 15300
KAKKAD HPS KSEB HYDRO-HYDRO 5000 13063 15300
KALLADA HPS KSEB HYDRO-HYDRO 1500 4436 15300
KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 46544 15300
KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 635 15300
LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 30822 15300
MALANKARA HPS KSEB HYDRO-HYDRO 1050 2474 15300
MATTUPETTY KSEB HYDRO-HYDRO 200 230 15300
MALAMPUZHA KSEB HYDRO-HYDRO 250 063 15300
CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 864 15300
URUMI ST I amp II KSEB HYDRO-HYDRO 615 903 15300
LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 248 15300
NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7765 19625 15300
PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 16601 15300
PANNIAR HPS KSEB HYDRO-HYDRO 3240 6217 15300
PORINGALKUTHU KSEB HYDRO-HYDRO 3600 10052 15300
PORINGALKUTHU LBE KSEB HYDRO-HYDRO 1600 9438 15300
PEPPARA KSEB HYDRO-HYDRO 300 395 15300
POOZHITHODE KSEB HYDRO-HYDRO 480 1045 15300
Page 38
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) PEECHI KSEB HYDRO-HYDRO 125 040 15300
RANI-PERUNADU KSEB HYDRO-HYDRO 400 585 15300
SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 79783 15300
SENGULAM HPS KSEB HYDRO-HYDRO 5120 11558 15300
SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 16711 15300
VILANGAD KSEB HYDRO-HYDRO 750 1578 15300
BARAPOLE KSEB HYDRO-HYDRO 1500 1932 15300
VELLATHOOVAL KSEB HYDRO-HYDRO 360 305 15300
CHIM0NY KSEB HYDRO-HYDRO 250 156 15300
ADYANPARA KSEB HYDRO-HYDRO 350 501 15300
BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 554 15300
KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 3801 15300
KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 23132 32800
ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 14416 62280
METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 523970 62280
METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 321270 62280
NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 336575 62280
NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 591240 62280
TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 508966 62280
KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 30897 62280
VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 18720 90699 62280
KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 33593 62280
BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 1047 62280
PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 1250 62280
PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 330 62280
MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 4897 62280
MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 032 62280
KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15681 62280
KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 40608 62280
KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 21342 62280
KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 4717 62280
KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4322 62280
KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2399 62280
METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 4416 62280
METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 8035 62280
BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2187 62280
BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2359 62280
BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2511 62280
BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 1949 62280
BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 1819 62280
POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 172 62280
SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 241 62280
MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 026 62280
THIRUMOORTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 136 62280
PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 9309 62280
VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 353 62280
SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 4192 62280
PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 6571 62280
SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 1186 62280
SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6319 62280
ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 6122 62280
KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 28674 62280
SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 18381 62280
SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 4258 62280
KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 12680 62280
KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4201 62280
ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 000 62280
PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 19175 62280
AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 078 62280
BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 504 62280
BHAVANI KATTALAI (BKB)(IIIampIII BB I amp II)TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 5847 62280
PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 000 62280
Page 39
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) SRI DAMODARAM STPS APPDCL THERMAL-COAL 160000 808108 36300
PRIVATE SECTOR
KARUPPUR TANJORE LANCO TANJORE PCL THERMAL-GAS 12000 48096 28770
SIMHAPURI ENERGY LTD SIMHAPURI ENERGY LTD THERMAL-COAL 60000 143900 39100
JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 7111 45500
SBU 1 JSW ENERGY LTD
VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 26000 159100
43300
SBU 2 JSW ENERGY LTD
VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 60000 247900
42800
LANCO KPLLANCO KONDAPALLI POWER
LTDTHERMAL-GAS 36814 85060
25776
LANCO KPL STG -IILANCO KONDAPALLI POWER
LTDTHERMAL-GAS 36600 12979
46330
LANCO KPL STG -IIIALANCO KONDAPALLI POWER
LTDTHERMAL-GAS 37100 85710
46330
LANCO KPL STG -III BLANCO KONDAPALLI POWER
LTDTHERMAL-GAS 37100 43639
46330
HINDUJA NATIONAL PCL HINDUJA NATIONAL PCL THERMAL-COAL 104000 303000 38200
MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 121164 49940
UDUPI POWER COR LTD ADANI POWER LTD THERMAL-COAL 120000 754613 42500
SPECTRUM POWER GENERATION
LTD SPECTRUM PG LTD THERMAL-GASN 20525 9256812
34952
TAQA NEYVELI POWER COM PVT
LTD TAQA NEYVELI THERMAL-LIG 25000 5840
34500
ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 251000 51000
ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 207860 36800
GMR VEMAGIRI POWER GENERATION
LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 30117
46450
EASTERN REGION
CENTRAL SECTOR
MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 64675 53113
MTPS STAGE - II KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 39000 1432 69138
BOKARO `B` TPS DVC THERMAL-COAL 63000 145670 31539
MEJIA TPS U 1-3 DVC THERMAL-COAL 63000 348298 31552
MEJIA TPS U 4 DVC THERMAL-COAL 21000 116099 34997
MEJIA TPS U 5-6 DVC THERMAL-COAL 50000 276427 35976
MEJIA TPS U 7-8 DVC THERMAL-COAL 100000 552854 36991
DURGAPUR STEEL TPS DVC THERMAL-COAL 100000 665550 39323
DURGAPUR TPS DVC THERMAL-COAL 21000 59270 35416
RAGHUNATHPUR TPS DVC THERMAL-COAL 120000 201650 35326
MAITHON HYDEL STA DVC HYDRO-HYDRO 6320 12200 17984
CHANDRAPURA TPSU1-3 DVC THERMAL-COAL 42000 257610 35095
CHANDRAPURA TPSU7-8 DVC THERMAL-COAL 50000 306673 34987
KODERMA TPS DVC THERMAL-COAL 100000 380180 38131
PANCHET HPS DVC HYDRO-HYDRO 8000 13360 17984
TILLAYA HPS DVC HYDRO-HYDRO 400 1410 17984
RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34700 35400
TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 277300 23200
TLDP -III NHPC LTD HYDRO-HYDRO 13200 55400 62000
TLDP -IV NHPC LTD HYDRO-HYDRO 16000 60300 25600
FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 957219 33700
FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 308943 41000
BONGAINGAON TPS NTPC LTD THERMAL-COAL 25000 153663 58600
KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 542277 34200
KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 942591 34200
BARH-II NTPC LTD THERMAL-COAL 132000 728021 44500
TALCHER TPS NTPC LTD THERMAL-COAL 46000 335521 30100
TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 702319 25600
TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1436521 24700
STATE SECTOR
BTPS(RampM) BIHAR STATE PGCL THERMAL-COAL 22000 12142 39700
BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 98331 10602
HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 50593 9482
CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 19689 2605
RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 53192 6033
UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 147208 14637
Page 40
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 60353 4519
IB TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 288567 25000
J P H GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 210 038 61100
MEYONG CHU GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 400 1086 61100
TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 122667 38200
DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 214339 43321
KOLAGHAT THERMAL POWER
STATION
WEST BENGAL PDCL THERMAL-COAL 126000 538269 31603
BAKRESHWAR THERMAL POWER
PLANT
WEST BENGAL PDCL THERMAL-COAL 105000 634876 32154
BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 45000 166855 33299
SANTHALDIH THERMAL POWER
STATION
WEST BENGAL PDCL THERMAL-COAL 50000 336442 34932
SAGARDIGHI THERMAL POWER
PROJECT
WEST BENGAL PDCL THERMAL-COAL 160000 423121 34705
JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 20344 68900
RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 24559 68900
TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 4623 68900
PURULIA PUMPED STORAGE
PROJECT
WEST BENGAL SEDCL HYDRO-HYDRO 90000 108816 68900
MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2768 68900
PRIVATE SECTOR
CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 49474 20230
CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 555500 70200
HALDIA ENERGY HALDIA ENERGY LTD THERMAL-COAL 60000 371000 50400
DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3688 63400
KAMALANGA TPS GMR KAMALANGA ENERGY LTD THERMAL-COAL 105000547670
33300
ADHUNIK POWER U-1 ADHUNIK POWER THERMAL-COAL 27000 158 44060
ADHUNIK POWER U-2 ADHUNIK POWER THERMAL-COAL 27000 168 44250
VL-JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 332800 23622
JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 43000 45250
JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 71700 37030
JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 70700 35920
JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 71100 38870
JOJOBERA UNIT 5 TATA POWER COM LTD THERMAL-COAL 12000 79300 44560
JOJOBERA UNIT 6 TATA POWER COM LTD THERMAL-WHR 12000 83700 12840
IEL KALINGANAGAR U-I TATA POWER COM LTD THERMAL-WG 6750 33400 22500
IEL KALINGANAGAR U-II TATA POWER COM LTD THERMAL-WG 6750 34800 22500
MAITHON UNIT 1 amp 2 TATA POWER COM LTD THERMAL-COAL 105000 678000 36100
HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 27500 24340
HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 28400 24340
HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 15800 24310
NORTH EASTERN REGION
CENTRAL SECTOR
LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 74100 36600
AGARTALA GT NEEPCO THERMAL-GAS 13500 88611 27210
ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 153111 32310
DOYANG HEP NEEPCO HYDRO-HYDRO 7500 25598 49801
KOPILI HEP NEEPCO HYDRO-HYDRO 20000 98186 11491
KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 19582 20237
KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 10310 17968
RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 124093 22945
TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 10100 17344 39000
STATE SECTOR
HYDRO POWER (122 Stns) ITANAGAR GOVT OF ARUNACHAL
PRADESHHYDRO-HYDRO 6971 6217270
24600
KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39514 17337
LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 82327 36810
NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 33318 48290
MYNTRIANG SHEP ST II ASSAM POWER GENCO HYDRO-HYDRO 300 567 35776
LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 9130 49200
LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 012 49200
DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 022 49200
TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 000 49200
UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 4990 16000
UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 6476 37000
UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 16494 14600
UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 3600 9556 15000
SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 758 8000
MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44070 44800
KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 154 41400
TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 091 41400
MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 411 41400
MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 394 41400
KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 760 41400
SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 3264 41400
LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 044 41400
BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 18953 28000
ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 43585 28200
GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 4080 11100
Note
LIG Lignite N Naptha WHR Waste Heat Recovery
Page 41
File NoCEA-CH-14-1142018-Coordination Division
2004-05 27800
2005-06 28100
2006-07 30200
2007-08 33000
2008-09 35500
2009-10 36700
2010-11 38700
2011-12 41756
2012-13 45460
2013-14 48940
2014-15 53040
2015-16 54590
2016-17 57430
2017-18 60800
Year
2005-06
2006-07
2007-08
2008-09
2009-10
2010-11
2011-12
2012-13
2013-14
2014-15
2015-16
2016-17
2017-18
2004-05 254 209 7568
2005-06 260 221 7636
2006-07 276 227 7423
2007-08 293 239 7727
2008-09 340 263 8713
2009-10 355 268 8870
2010-11 398 303 11975
2011-12 455 330 13514
2012-13 501 376 14867
2013-14 518 175
2014-15 520
6719
7171
3 All India yearly Coal Consumption for Power Generation (Utilities)
YEARCoal Consumption
Million Tonnes
4 All India Annual per Capita consumption of Electricity Since 2006
Per Capita Consumption ( kWh)
6314
(GrossGen+ Net Import) Mid-year population
5 Average cost of power supply amp average realization ( paiseKWH )
Yearcost of supply
(paiseunit)
Realization(paiseunit)
Including AgricultureOnly
Agriculture
1149
7335
7786
91441
8188
88363
957
1010
1075
1122
File NoCEA-CH-14-1142018-Coordination Division
Source- PFC Reports on the performance of State Power Utilities 31
File NoCEA-CH-14-1142018-Coordination Division
Sl
NoExecuting Agency
Installed
Capacity (MW)Cost (Rs crore)
Date of
Clearance
32
No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification
since 2004-05
65291374575 296361511th Plan
Cumu upto End of 11th Plan
596556 21212860
557439Cummulative up to end of 12th Plan
46708
18423975
499150
2003-042004-05
5743
9769
Cumu upto End of 10th Plan
010407 to 310308
010410 to 310311557976840909
010411 to 310312
412667
86293726
3207
482864
12632
1576036
4451722594
15455554
2314176
397343611750
2093311060316074
65109527813884
6 Growth Of Rural Electrification amp Pumpsets Energisation
Plan Year
9th Plan2002-03
134092626
4111
Pump Sets Energised Villages Electricfied (Nos)
2001-02
284064367244
1218
27801997-981998-991999-002000-01
297594
010408 to 310309010409 to 310310
10th Plan
2005-062006-07
322968331020
Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as
Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received
from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made
available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified
villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is
independent of the earlier published reports
No Hydro Electric Project has been issued concurrenceAppraisal letter by CEA during October 2018
7 Status of Hydro Schemes Cleared by the CEA in Oct-2018
Name of Scheme
File NoCEA-CH-14-1142018-Coordination Division
SN Contents Page
1 Rate of sale of power for the year 2016-17 33-41
RATE OF SALE OF POWER FOR THE YEAR 2016-17
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) NORTHERN REGION
CENTRAL SECTOR
BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 18000 66900 19800
CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 54000 222400 21600
CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 30000 144400 19600
CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 23100 91700 42600
PARBATI - III HPS NHPC LTD HYDRO-HYDRO 52000 68200 54800
DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 28000 95600 30000
CHUTAK NHPC LTD HYDRO-HYDRO 4400 22000 79800
DULHASTI HPS NHPC LTD HYDRO-HYDRO 39000 228000 56400
SALAL HPS NHPC LTD HYDRO-HYDRO 69000 342300 11000
TANAKPUR HPS NHPC LTD HYDRO-HYDRO 9420 43000 29600
URI HPS -I NHPC LTD HYDRO-HYDRO 48000 280300 16000
URI HPS - II NHPC LTD HYDRO-HYDRO 24000 147300 48600
NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 4500 24600 88200
SEWA - II NHPC LTD HYDRO-HYDRO 12000 47100 43400
ANTA CCPP NTPC LTD THERMAL-GASN 41930 67539 32400
AURAIYA CCPP NTPC LTD THERMAL-GASN 66336 53501 39100
BADARPUR TPS NTPC LTD THERMAL-COAL 70500 159153 44800
DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 84000 296170 42300
DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 98000 526686 46300
DADRI CCPP NTPC LTD THERMAL-GASHSD 82978 227469 33000
FARIDABAD CCPP NTPC LTD THERMAL-GASN 43159 115577 30800
RIHAND STPS I NTPC LTD THERMAL-COAL 100000 596766 24500
RIHAND STPS II NTPC LTD THERMAL-COAL 100000 737069 24600
RIHAND STPS III NTPC LTD THERMAL-COAL 100000 706546 30600
SINGRAULI STPS NTPC LTD THERMAL-COAL 200000 1394068 20400
TANDA TPS NTPC LTD THERMAL-COAL 44000 295438 40800
UNCHAHAR TPS I NTPC LTD THERMAL-COAL 42000 256454 39800
UNCHAHAR TPS II NTPC LTD THERMAL-COAL 42000 273577 38900
UNCHAHAR TPS III NTPC LTD THERMAL-COAL 21000 142780 43000
KOLDAM NTPC LTD HYDRO-HYDRO 80000 363260 43600
NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 303575 25841
RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 108000 668677 35374
NJHPS SJVNL HYDRO-HYDRO 150000 699496 23820
RAMPUR HPS SJVNL HYDRO-HYDRO 41202 195982 32260
TEHRI HPP THDC HYDRO-HYDRO 100000 272543 51800
KOTESHWAR HEP THDC HYDRO-HYDRO 40000 106244 53400
IGSTPS JHAJJAR ARAVALI P CPL THERMAL-COAL 150000 510429 49490
NEYVELI BARSINGSAR NEYVELI LIG CORP LTD THERMAL-LIG 25000 127520 38040
STATE SECTOR
PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 21000 14222 48200
PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 21000 19205 48400
PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 25000 102257 42600
PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 25000 62107 41800
DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 60000 312213 41000
RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 120000 35767442200
WYC HYDEL STATION HPGCL HYDRO-HYDRO 6240 20365 24900
GIRI POWER HOUSE HPSEB HYDRO-HYDRO 6000 13958 7600
ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 1695 5467 11900
BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 12000 18528 6700
GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 2250 7462 22500
BASSI POWER HOUSE HPSEB HYDRO-HYDRO 6600 29649 7500
BINWA POWER HOUSE HPSEB HYDRO-HYDRO 600 2749 19300
ANNEXURE-I
RATE OF SALE OF POWER FOR THE YEAR 2016-2017
Page 33
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) GAJ POWER HOUSE HPSEB HYDRO-HYDRO 1050 2914 26700
BANER POWER HOUSE HPSEB HYDRO-HYDRO 1200 2864 16200
HOLI POWER HOUSE HPSEB HYDRO-HYDRO 300 616 22500
THIROT POWER HOUSE HPSEB HYDRO-HYDRO 450 1126 22500
KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 1200 3064 22500
LARJI POWER HOUSE HPSEB HYDRO-HYDRO 12600 53677 23700
NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 250 750 31000
CHABA POWER HOUSE HPSEB HYDRO-HYDRO 175 465 23300
RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 150 101 13400
SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 200 000 22500
KILLAR HPSEB HYDRO-HYDRO 030 050 22500
BHABA AUGUMENP H HPSEB HYDRO-HYDRO 450 1276 22500
BS CHAMBA HPSEB HYDRO-HYDRO 045 099 19500
GUMMA HPSEB HYDRO-HYDRO 300 423 22500
GAS TURBINE POWER STATION IPGCL THERMAL-GAS 27000 67233 39300
PPS-I PPCL THERMAL-GAS 33000 175905 38300
PPS-III PPCL THERMAL-GAS 137120 196879 36100
LOWER JHELUM JampKPDD HYDRO-HYDRO 10500 60214 5100
UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 2260 10514 6300
UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 10500 44202 8500
GANDHARBAL JampKPDD HYDRO-HYDRO 1500 8925 4700
KARNAH MPH JampKPDD HYDRO-HYDRO 200 1122 31000
CHENANI I JampKPDD HYDRO-HYDRO 2330 10892 6600
CHENANI II JampKPDD HYDRO-HYDRO 200 1188 9300
CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 750 3634 14200
IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 375 2108 18500
IGO MERCHELLONG JampKPDD HYDRO-HYDRO 300 1572 29700
PAHALGAM MHP JampKPDD HYDRO-HYDRO 450 1713 32900
MARPACHOO JampKPDD HYDRO-HYDRO 075 375 29800
HAFTAL JampKPDD HYDRO-HYDRO 100 483 28700
SANJAK JampKPDD HYDRO-HYDRO 126 441 36000
SEWA-III JampKPDD HYDRO-HYDRO 900 3273 20200
BHADERWAH JampKPDD HYDRO-HYDRO 150 935 8900
BAZGO JampKPDD HYDRO-HYDRO 030 108 33300
SUMOOR JampKPDD HYDRO-HYDRO 010 045 35400
HUNDER JampKPDD HYDRO-HYDRO 040 176 26200
STAKNA JampKPDD HYDRO-HYDRO 400 1933 4100
KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 124000 662879 31360
SURATGARH TPS RRVUNL THERMAL-COAL 150000 402328 41730
CHHABRA TPS 1amp 2 RRVUNL THERMAL-COAL 50000 305946 36700
CHHABRA TPS 3 RRVUNL THERMAL-COAL 25000 151536 36700
CHHABRA TPS 4 RRVUNL THERMAL-COAL 25000 155896 36700
RAMGARH GT POWER PROJECT RRVUNL THERMAL-COAL 22050 43177 41800
RAMGARH GAS T P PROJECT 3 RRVUNL THERMAL-GAS 5000 93615 41800
DHOLPUR C C POWER PROJECT RRVUNL THERMAL-R-LNG 33000 9486 46110
MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 14000 20855 34192
MINI MICRO HYDEL (MMH) P S RRVUNL HYDRO-HYDRO 2385 851 37800
KALISINDH TPP 1 RRVUNL THERMAL-COAL 60000 341543 45000
KALISINDH TPP 2 RRVUNL THERMAL-COAL 60000 211588 45000
KHARA HEP UPJVNL HYDRO-HYDRO 7200 26654 7200
MATATILLA HEP UPJVNL HYDRO-HYDRO 3060 12219 6500
OBRA HEP UPJVNL HYDRO-HYDRO 9900 21517 6300
RIHAND UPJVNL HYDRO-HYDRO 30000 57369 5500
ANPARA A TPS UPRVUNL THERMAL-COAL 63000 317536 27000
ANPARA B TPS UPRVUNL THERMAL-COAL 100000 705605 22700
ANPARA D UPRVUNL THERMAL-COAL 100000 300158 39800
HARDUAGANJ TPS UPRVUNL THERMAL-COAL 16500 45817 49200
HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 50000 304389 46600
OBRA A TPS UPRVUNL THERMAL-COAL 28800 13158 34000
OBRA B TPS UPRVUNL THERMAL-COAL 100000 328124 21900
Page 34
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) PANKI TPS UPRVUNL THERMAL-COAL 21000 66488 50300
PARICHHA TPS UPRVUNL THERMAL-COAL 22000 38762 49400
PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 42000 231931 45600
PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 50000 276722 50400
CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 24000 70845 8290
CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 14400 75366 8390
DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 3375 9595 12080
DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 5100 18701 10520
KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4140 17359 12330
KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 12000 33001 9420
KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 3000 11953 8320
TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 9000 33983 12460
MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 30400 124510 16110
RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 19800 17897 10550
MPUR UTTARAKHAND JVNL HYDRO-HYDRO 930 5121 19200
PATHRI UTTARAKHAND JVNL HYDRO-HYDRO 2040 11636 14200
GALOGI UTTARAKHAND JVNL HYDRO-HYDRO 300 648 12500
PRIVATE SECTOR
MGTPP CLP INDIA PVT LTD THERMAL-COAL 132000 268902 41940
SHRINAGAR HEP ALAKNANDA HPCL HYDRO-HYDRO 33000 127414 48800
GAMA INFRAPROP CCPP GAMA INFRAPROP PVT THERMAL-GAS 22500 52686 47000
PPGCL (BARA) JP POWER VENTURES LTD THERMAL-COAL 198000 448200 38500
MALANA HEP MALANA PCL HYDRO-HYDRO 8600 26354 29792
MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 10000 30369 32580
ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 19200 56347 36079
KASHANG HEP H P PCL HYDRO-HYDRO 19500 5034 29200
BASPA-II HEP HBPCL HYDRO-HYDRO 30000 132769 13600
KARCHAM WANGTOO HEP HBPCL HYDRO-HYDRO 100000 434386 36600
RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 108000 582600 43700
RITHALA COMBI CY POWER PLANT TATA POWER DDL THERMAL-GAS 9480 000 11900
RAJPURA TPS NABHA POWER LTD THERMAL-GAS 140000 901484 39000
TALWANDI SABO POWER LTD TALWANDI SABO POWER LTD THERMAL-COAL 198000 636040 49548
ROJA THERMAL POWER STATION ROJA POWER SCL THERMAL-COAL 120000 727200 43400
KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 34400 63400
BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 36000 62600
MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 38200 60800
UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 37900 61500
KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 42300 58800
LALITPUR PGCL BAJAJ ENERGY PVT LTD THERMAL-COAL 198000 359400 47300
PRAYAGRAJ PGCL PRAYAGRAJ PGCL THERMAL-COAL 132000 448200 38595
KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 132000 783182 33438
WESTERN REGION
CENTRAL SECTOR
INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 100000 325333 23892
OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 52000 141663 34001
GANDHAR CCPP NTPC LTD THERMAL-GAS 65739 221924 28700
KAWAS CCPP NTPC LTD THERMAL-GASN 65620 167929 27000
KORBA I amp II NTPC LTD THERMAL-COAL 210000 1499171 20500
KORBA III NTPC LTD THERMAL-COAL 50000 358746 26600
SIPAT STPS I NTPC LTD THERMAL-COAL 198000 1479902 26800
SIPAT STPS II NTPC LTD THERMAL-COAL 100000 766549 26500
VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 126000 693142 25800
VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 100000 608781 23800
VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 100000 673475 27600
VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 100000 655924 32900
VINDHYACHAL STPS V NTPC LTD THERMAL-COAL 50000 328265 31700
MOUDA I NTPC LTD THERMAL-COAL 100000 343130 44500
MOUDA Ii NTPC LTD THERMAL-COAL 66000 40637 39900
RATNAGIRI GAS amp POWER PVT LTD RGPPL THERMAL-GAS 196708 442485 47000
KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 000 24729
TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 32000 201227 10740
Page 35
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 365122 19069
TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 787444 29324
STATE SECTOR
GSEG-HAZIRA15610 MW GUJARAT S ENEGEN LTD THERMAL-GAS 15610 1805 28200
GSEG-HAZIRA35143 MW GUJARAT S ENEGEN LTD THERMAL-GAS 35130 22276 51300
GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 21978 51800
AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 13929 26100
KORBA TPS EAST CSPGCL THERMAL-COAL 44000 198673 33880
DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 365808 27570
KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 316500 30420
HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 532878 19410
CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 515 58300
MTTPS CHAMPA U-I CSPGCL THERMAL-COAL 50000 220376 39000
MTTPS CHAMPA U-II CSPGCL THERMAL-COAL 50000 23709 10000
SHP GANGREL CSPGCL HYDRO-HYDRO 1000 2350 36790
BANGO HEP CSPGCL HYDRO-HYDRO 12000 14662 8900
MHP KORBA WEST CSPGCL HYDRO-HYDRO 170 859 38190
SIKASAR HEP CSPGCL HYDRO-HYDRO 700 418 26870
DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8843 74500
DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 19446 51500
GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 66388 71600
GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127488 41300
KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 96072 43900
KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 29841 56400
SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 184966 58800
UKAI 1-5 GSECL THERMAL-COAL 85000 204891 46900
UKAI TPS 6 GSECL THERMAL-COAL 50000 284448 48200
WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 271999 58300
WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 82808 44100
KADANA HPS GSECL HYDRO-HYDRO 24200 34433 16800
UKAI HPS GSECL HYDRO-HYDRO 30500 40585 6100
TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 123000 11500
BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 8900 10900
BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 7200 27500
JHINNA HPS MPPGCL HYDRO-HYDRO 2000 9700 18500
RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 44300 3400
GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 17300 4600
SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 4100 16900
MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 14600 27000
PENCH HPS MPPGCL HYDRO-HYDRO 16000 23700 8100
RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 3000 16900
AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 134400 35100
SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 283800 38700
SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 344600 34300
SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 111600 61600
SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 211800 58000
SSTPS PH-I MPPGCL THERMAL-COAL 120000 233100 84300
BHUSAWAL TPS MSPGCL THERMAL-COAL 142000 566258 51100
CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1365682 33700
KHAPERKHEDA MSPGCL THERMAL-COAL 134000 706207 39100
KORADI TPS MSPGCL THERMAL-COAL 62000 443206 42000
NASIK TPS MSPGCL THERMAL-COAL 63000 297275 47000
PARLI TPS MSPGCL THERMAL-COAL 113000 175934 71600
PARAS MSPGCL THERMAL-COAL 50000 267931 38700
URAN CCPP MSPGCL THERMAL-GAS 67200 320330 30600
KOYANA MSPGCL HYDRO-HYDRO 195600 328155 13100
SMALL HYDRO POWER PLANTS MSPGCL HYDRO-HYDRO 45400 93062 30500
BHIRA MSPGCL HYDRO-HYDRO 8000 10046 8400
TILLARI MSPGCL HYDRO-HYDRO 8900 10584 3100
SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 233298 20500
SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 87633 20500
PRIVATE SECTOR
Page 36
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 81282 46750
JNSTPP(JAYPEE NIGRIE) JP POWER VENTURES LTD THERMAL-COAL 132000 726695 29310
MB POWER MB POWER THERMAL-COAL 120000 345632 38310
ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 754922 28671
ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 780761 23495
ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 198000 1263784 32090
ADANI POWER MAHARA ADANI POWER LTD THERMAL-COAL 330000 1666191 34124
AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 170065 36827
SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 252035 45129
ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 458551 36000
ESSAR POWER MP LTD ESSAR POWER MP LTD THERMAL-COAL 60000 243040 28600
VEDANTA LTD (P P -I) VEDANTA LTD THERMAL-GAS 3000 15044 24000
VEDANTA LTD (P P -II) VEDANTA LTD THERMAL-GAS 3000 21293 24000
PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 8234600 24000
165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 5850 64390
145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 68717 40349
SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 132655 28776
SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 144686 38567
MUNDRA UMPPCOASTAL GUJARAT POWER
LTD THERMAL-IMP COAL 400000 2530300
23900
LANCO AMARKANTAK TPP PATHADIH
U-ILANCO AMARKAN POWER LTD THERMAL-COAL 30000 195500
29200
LANCO AMARKANTAK TPP PATHADIH
U-IILANCO AMARKAN POWER LTD THERMAL-COAL 30000 206900
27600
BARADARHA TPS D B POWER LTD THERMAL-COAL 120000 677373 29200
JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 405000 28900
JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 453000 40500
DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 339437 40700
TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 293400 44000
TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 137200 37000
TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 174900 44000
BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 92900 14100
BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23700 34300
KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 27600 48300
CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2530300 23900
BHANDARDRA HEP -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 2475 54900
SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 161400 26500
SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 445000 39000
SOTHERN REGION
CENTRAL SECTOR
NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 325699 54820
NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 305532 39880
NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 998805 38510
NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 113016 54070
NEYVELI TAMILNADU POWER LTD JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 625274 42200
VALLUR TPS NTPC TECL THERMAL-COAL 150000 856438 42350
R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 1493 84300
RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1502919 29400
RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 341291 31800
SIMHADRI I NTPC LTD THERMAL-COAL 100000 688382 36800
SIMHADRI II NTPC LTD THERMAL-COAL 100000 663657 43400
KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 593110 31324
MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 291625 21764
KKNPP-1 amp 2 NPCIL NUCLEAR-NUCLEAR 200000 572609 40948
MINICOY LAKSHADEEP THERMAL-DIESEL 340 770 29600
KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1097 29600
AMINI LAKSHADEEP THERMAL-DIESEL 265 509 29600
ANDROTT LAKSHADEEP THERMAL-DIESEL 219 524 29600
KALPENI LAKSHADEEP THERMAL-DIESEL 175 356 29600
AGATTI LAKSHADEEP THERMAL-DIESEL 195 658 29600
KADMAT LAKSHADEEP THERMAL-DIESEL 190 414 29600
KILTAN LAKSHADEEP THERMAL-DIESEL 150 269 29600
CHETLET LAKSHADEEP THERMAL-DIESEL 100 139 29600
BITRA LAKSHADEEP THERMAL-DIESEL 043 024 29600
BANGARAM LAKSHADEEP THERMAL-DIESEL 018 009 29600
Page 37
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) STATE SECTOR
Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 721811 46500
Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 50000 336142 46500
RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 237358 46500
RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 239926 46500
RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 124500 46500
SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 62109 46500
UPPER SILERU APGENCO HYDRO-HYDRO 24000 33000 46500
LOWER SILERU APGENCO HYDRO-HYDRO 46000 81066 46500
DONKARAI APGENCO HYDRO-HYDRO 2500 6007 46500
PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 1262 46500
CHETTIPETA APGENCO HYDRO-HYDRO 100 214 46500
MUCHKUND APGENCO HYDRO-HYDRO 12000 37571 46500
NAGARJUNASAGAR RCPH APGENCO HYDRO-HYDRO 9000 606 46500
TUNGABHADRA HES amp HAMPI(AP
Share)
APGENCO HYDRO-HYDRO 7200 6100 46500
KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 352232 42600
KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 288131 32500
KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 319272 46500
RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 40073 44300
KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 308317 46000
KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 308963 51300
SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 61004 76600
NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 17960 75300
PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 20873 58300
POCHAMPAD-I TSPGENCO HYDRO-HYDRO 2700 5455 29800
POCHAMPAD-II TSPGENCO HYDRO-HYDRO 900 1932 40700
NIZAMSAGAR TSPGENCO HYDRO-HYDRO 1000 1126 53400
RAICHUR TPS 1 to 7 KPCL THERMAL-COAL 147000 890866 43800
RAICHUR TPS 8 KPCL THERMAL-COAL 25000 159523 48200
BELLARI TPS 1 KPCL THERMAL-COAL 50000 318679 51100
BELLARI TPS 2 KPCL THERMAL-COAL 50000 232347 55600
BELLARI TPS 3 KPCL THERMAL-COAL 70000 47565 34400
BHADRA PH KPCL HYDRO-HYDRO 3920 2369 45900
GERUSUPPA PH KPCL HYDRO-HYDRO 24000 26990 22000
GHAT PRABHA HEP KPCL HYDRO-HYDRO 3200 4777 25300
KADRA HPS KPCL HYDRO-HYDRO 15000 16889 26800
NAGJHARI KPCL HYDRO-HYDRO 90000 155159 9800
KODASALLI DPH KPCL HYDRO-HYDRO 12000 14854 19200
MUNIRA+MGH+SPH+SPH KPCL HYDRO-HYDRO 22640 48211 7900
SHARAVATHY HPS KPCL HYDRO-HYDRO 108550 276215 5400
ALMATTI DPH KPCL HYDRO-HYDRO 29000 39611 24600
VARAHI UGPH KPCL HYDRO-HYDRO 46000 71368 15600
IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 17196 15300
IDUKKI HPS KSEB HYDRO-HYDRO 78000 137905 15300
KAKKAD HPS KSEB HYDRO-HYDRO 5000 13063 15300
KALLADA HPS KSEB HYDRO-HYDRO 1500 4436 15300
KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 46544 15300
KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 635 15300
LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 30822 15300
MALANKARA HPS KSEB HYDRO-HYDRO 1050 2474 15300
MATTUPETTY KSEB HYDRO-HYDRO 200 230 15300
MALAMPUZHA KSEB HYDRO-HYDRO 250 063 15300
CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 864 15300
URUMI ST I amp II KSEB HYDRO-HYDRO 615 903 15300
LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 248 15300
NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7765 19625 15300
PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 16601 15300
PANNIAR HPS KSEB HYDRO-HYDRO 3240 6217 15300
PORINGALKUTHU KSEB HYDRO-HYDRO 3600 10052 15300
PORINGALKUTHU LBE KSEB HYDRO-HYDRO 1600 9438 15300
PEPPARA KSEB HYDRO-HYDRO 300 395 15300
POOZHITHODE KSEB HYDRO-HYDRO 480 1045 15300
Page 38
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) PEECHI KSEB HYDRO-HYDRO 125 040 15300
RANI-PERUNADU KSEB HYDRO-HYDRO 400 585 15300
SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 79783 15300
SENGULAM HPS KSEB HYDRO-HYDRO 5120 11558 15300
SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 16711 15300
VILANGAD KSEB HYDRO-HYDRO 750 1578 15300
BARAPOLE KSEB HYDRO-HYDRO 1500 1932 15300
VELLATHOOVAL KSEB HYDRO-HYDRO 360 305 15300
CHIM0NY KSEB HYDRO-HYDRO 250 156 15300
ADYANPARA KSEB HYDRO-HYDRO 350 501 15300
BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 554 15300
KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 3801 15300
KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 23132 32800
ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 14416 62280
METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 523970 62280
METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 321270 62280
NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 336575 62280
NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 591240 62280
TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 508966 62280
KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 30897 62280
VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 18720 90699 62280
KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 33593 62280
BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 1047 62280
PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 1250 62280
PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 330 62280
MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 4897 62280
MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 032 62280
KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15681 62280
KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 40608 62280
KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 21342 62280
KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 4717 62280
KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4322 62280
KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2399 62280
METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 4416 62280
METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 8035 62280
BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2187 62280
BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2359 62280
BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2511 62280
BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 1949 62280
BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 1819 62280
POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 172 62280
SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 241 62280
MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 026 62280
THIRUMOORTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 136 62280
PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 9309 62280
VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 353 62280
SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 4192 62280
PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 6571 62280
SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 1186 62280
SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6319 62280
ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 6122 62280
KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 28674 62280
SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 18381 62280
SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 4258 62280
KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 12680 62280
KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4201 62280
ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 000 62280
PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 19175 62280
AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 078 62280
BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 504 62280
BHAVANI KATTALAI (BKB)(IIIampIII BB I amp II)TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 5847 62280
PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 000 62280
Page 39
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) SRI DAMODARAM STPS APPDCL THERMAL-COAL 160000 808108 36300
PRIVATE SECTOR
KARUPPUR TANJORE LANCO TANJORE PCL THERMAL-GAS 12000 48096 28770
SIMHAPURI ENERGY LTD SIMHAPURI ENERGY LTD THERMAL-COAL 60000 143900 39100
JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 7111 45500
SBU 1 JSW ENERGY LTD
VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 26000 159100
43300
SBU 2 JSW ENERGY LTD
VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 60000 247900
42800
LANCO KPLLANCO KONDAPALLI POWER
LTDTHERMAL-GAS 36814 85060
25776
LANCO KPL STG -IILANCO KONDAPALLI POWER
LTDTHERMAL-GAS 36600 12979
46330
LANCO KPL STG -IIIALANCO KONDAPALLI POWER
LTDTHERMAL-GAS 37100 85710
46330
LANCO KPL STG -III BLANCO KONDAPALLI POWER
LTDTHERMAL-GAS 37100 43639
46330
HINDUJA NATIONAL PCL HINDUJA NATIONAL PCL THERMAL-COAL 104000 303000 38200
MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 121164 49940
UDUPI POWER COR LTD ADANI POWER LTD THERMAL-COAL 120000 754613 42500
SPECTRUM POWER GENERATION
LTD SPECTRUM PG LTD THERMAL-GASN 20525 9256812
34952
TAQA NEYVELI POWER COM PVT
LTD TAQA NEYVELI THERMAL-LIG 25000 5840
34500
ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 251000 51000
ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 207860 36800
GMR VEMAGIRI POWER GENERATION
LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 30117
46450
EASTERN REGION
CENTRAL SECTOR
MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 64675 53113
MTPS STAGE - II KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 39000 1432 69138
BOKARO `B` TPS DVC THERMAL-COAL 63000 145670 31539
MEJIA TPS U 1-3 DVC THERMAL-COAL 63000 348298 31552
MEJIA TPS U 4 DVC THERMAL-COAL 21000 116099 34997
MEJIA TPS U 5-6 DVC THERMAL-COAL 50000 276427 35976
MEJIA TPS U 7-8 DVC THERMAL-COAL 100000 552854 36991
DURGAPUR STEEL TPS DVC THERMAL-COAL 100000 665550 39323
DURGAPUR TPS DVC THERMAL-COAL 21000 59270 35416
RAGHUNATHPUR TPS DVC THERMAL-COAL 120000 201650 35326
MAITHON HYDEL STA DVC HYDRO-HYDRO 6320 12200 17984
CHANDRAPURA TPSU1-3 DVC THERMAL-COAL 42000 257610 35095
CHANDRAPURA TPSU7-8 DVC THERMAL-COAL 50000 306673 34987
KODERMA TPS DVC THERMAL-COAL 100000 380180 38131
PANCHET HPS DVC HYDRO-HYDRO 8000 13360 17984
TILLAYA HPS DVC HYDRO-HYDRO 400 1410 17984
RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34700 35400
TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 277300 23200
TLDP -III NHPC LTD HYDRO-HYDRO 13200 55400 62000
TLDP -IV NHPC LTD HYDRO-HYDRO 16000 60300 25600
FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 957219 33700
FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 308943 41000
BONGAINGAON TPS NTPC LTD THERMAL-COAL 25000 153663 58600
KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 542277 34200
KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 942591 34200
BARH-II NTPC LTD THERMAL-COAL 132000 728021 44500
TALCHER TPS NTPC LTD THERMAL-COAL 46000 335521 30100
TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 702319 25600
TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1436521 24700
STATE SECTOR
BTPS(RampM) BIHAR STATE PGCL THERMAL-COAL 22000 12142 39700
BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 98331 10602
HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 50593 9482
CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 19689 2605
RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 53192 6033
UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 147208 14637
Page 40
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 60353 4519
IB TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 288567 25000
J P H GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 210 038 61100
MEYONG CHU GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 400 1086 61100
TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 122667 38200
DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 214339 43321
KOLAGHAT THERMAL POWER
STATION
WEST BENGAL PDCL THERMAL-COAL 126000 538269 31603
BAKRESHWAR THERMAL POWER
PLANT
WEST BENGAL PDCL THERMAL-COAL 105000 634876 32154
BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 45000 166855 33299
SANTHALDIH THERMAL POWER
STATION
WEST BENGAL PDCL THERMAL-COAL 50000 336442 34932
SAGARDIGHI THERMAL POWER
PROJECT
WEST BENGAL PDCL THERMAL-COAL 160000 423121 34705
JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 20344 68900
RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 24559 68900
TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 4623 68900
PURULIA PUMPED STORAGE
PROJECT
WEST BENGAL SEDCL HYDRO-HYDRO 90000 108816 68900
MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2768 68900
PRIVATE SECTOR
CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 49474 20230
CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 555500 70200
HALDIA ENERGY HALDIA ENERGY LTD THERMAL-COAL 60000 371000 50400
DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3688 63400
KAMALANGA TPS GMR KAMALANGA ENERGY LTD THERMAL-COAL 105000547670
33300
ADHUNIK POWER U-1 ADHUNIK POWER THERMAL-COAL 27000 158 44060
ADHUNIK POWER U-2 ADHUNIK POWER THERMAL-COAL 27000 168 44250
VL-JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 332800 23622
JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 43000 45250
JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 71700 37030
JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 70700 35920
JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 71100 38870
JOJOBERA UNIT 5 TATA POWER COM LTD THERMAL-COAL 12000 79300 44560
JOJOBERA UNIT 6 TATA POWER COM LTD THERMAL-WHR 12000 83700 12840
IEL KALINGANAGAR U-I TATA POWER COM LTD THERMAL-WG 6750 33400 22500
IEL KALINGANAGAR U-II TATA POWER COM LTD THERMAL-WG 6750 34800 22500
MAITHON UNIT 1 amp 2 TATA POWER COM LTD THERMAL-COAL 105000 678000 36100
HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 27500 24340
HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 28400 24340
HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 15800 24310
NORTH EASTERN REGION
CENTRAL SECTOR
LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 74100 36600
AGARTALA GT NEEPCO THERMAL-GAS 13500 88611 27210
ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 153111 32310
DOYANG HEP NEEPCO HYDRO-HYDRO 7500 25598 49801
KOPILI HEP NEEPCO HYDRO-HYDRO 20000 98186 11491
KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 19582 20237
KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 10310 17968
RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 124093 22945
TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 10100 17344 39000
STATE SECTOR
HYDRO POWER (122 Stns) ITANAGAR GOVT OF ARUNACHAL
PRADESHHYDRO-HYDRO 6971 6217270
24600
KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39514 17337
LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 82327 36810
NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 33318 48290
MYNTRIANG SHEP ST II ASSAM POWER GENCO HYDRO-HYDRO 300 567 35776
LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 9130 49200
LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 012 49200
DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 022 49200
TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 000 49200
UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 4990 16000
UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 6476 37000
UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 16494 14600
UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 3600 9556 15000
SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 758 8000
MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44070 44800
KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 154 41400
TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 091 41400
MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 411 41400
MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 394 41400
KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 760 41400
SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 3264 41400
LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 044 41400
BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 18953 28000
ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 43585 28200
GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 4080 11100
Note
LIG Lignite N Naptha WHR Waste Heat Recovery
Page 41
File NoCEA-CH-14-1142018-Coordination Division
Source- PFC Reports on the performance of State Power Utilities 31
File NoCEA-CH-14-1142018-Coordination Division
Sl
NoExecuting Agency
Installed
Capacity (MW)Cost (Rs crore)
Date of
Clearance
32
No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification
since 2004-05
65291374575 296361511th Plan
Cumu upto End of 11th Plan
596556 21212860
557439Cummulative up to end of 12th Plan
46708
18423975
499150
2003-042004-05
5743
9769
Cumu upto End of 10th Plan
010407 to 310308
010410 to 310311557976840909
010411 to 310312
412667
86293726
3207
482864
12632
1576036
4451722594
15455554
2314176
397343611750
2093311060316074
65109527813884
6 Growth Of Rural Electrification amp Pumpsets Energisation
Plan Year
9th Plan2002-03
134092626
4111
Pump Sets Energised Villages Electricfied (Nos)
2001-02
284064367244
1218
27801997-981998-991999-002000-01
297594
010408 to 310309010409 to 310310
10th Plan
2005-062006-07
322968331020
Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as
Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received
from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made
available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified
villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is
independent of the earlier published reports
No Hydro Electric Project has been issued concurrenceAppraisal letter by CEA during October 2018
7 Status of Hydro Schemes Cleared by the CEA in Oct-2018
Name of Scheme
File NoCEA-CH-14-1142018-Coordination Division
SN Contents Page
1 Rate of sale of power for the year 2016-17 33-41
RATE OF SALE OF POWER FOR THE YEAR 2016-17
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) NORTHERN REGION
CENTRAL SECTOR
BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 18000 66900 19800
CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 54000 222400 21600
CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 30000 144400 19600
CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 23100 91700 42600
PARBATI - III HPS NHPC LTD HYDRO-HYDRO 52000 68200 54800
DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 28000 95600 30000
CHUTAK NHPC LTD HYDRO-HYDRO 4400 22000 79800
DULHASTI HPS NHPC LTD HYDRO-HYDRO 39000 228000 56400
SALAL HPS NHPC LTD HYDRO-HYDRO 69000 342300 11000
TANAKPUR HPS NHPC LTD HYDRO-HYDRO 9420 43000 29600
URI HPS -I NHPC LTD HYDRO-HYDRO 48000 280300 16000
URI HPS - II NHPC LTD HYDRO-HYDRO 24000 147300 48600
NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 4500 24600 88200
SEWA - II NHPC LTD HYDRO-HYDRO 12000 47100 43400
ANTA CCPP NTPC LTD THERMAL-GASN 41930 67539 32400
AURAIYA CCPP NTPC LTD THERMAL-GASN 66336 53501 39100
BADARPUR TPS NTPC LTD THERMAL-COAL 70500 159153 44800
DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 84000 296170 42300
DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 98000 526686 46300
DADRI CCPP NTPC LTD THERMAL-GASHSD 82978 227469 33000
FARIDABAD CCPP NTPC LTD THERMAL-GASN 43159 115577 30800
RIHAND STPS I NTPC LTD THERMAL-COAL 100000 596766 24500
RIHAND STPS II NTPC LTD THERMAL-COAL 100000 737069 24600
RIHAND STPS III NTPC LTD THERMAL-COAL 100000 706546 30600
SINGRAULI STPS NTPC LTD THERMAL-COAL 200000 1394068 20400
TANDA TPS NTPC LTD THERMAL-COAL 44000 295438 40800
UNCHAHAR TPS I NTPC LTD THERMAL-COAL 42000 256454 39800
UNCHAHAR TPS II NTPC LTD THERMAL-COAL 42000 273577 38900
UNCHAHAR TPS III NTPC LTD THERMAL-COAL 21000 142780 43000
KOLDAM NTPC LTD HYDRO-HYDRO 80000 363260 43600
NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 303575 25841
RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 108000 668677 35374
NJHPS SJVNL HYDRO-HYDRO 150000 699496 23820
RAMPUR HPS SJVNL HYDRO-HYDRO 41202 195982 32260
TEHRI HPP THDC HYDRO-HYDRO 100000 272543 51800
KOTESHWAR HEP THDC HYDRO-HYDRO 40000 106244 53400
IGSTPS JHAJJAR ARAVALI P CPL THERMAL-COAL 150000 510429 49490
NEYVELI BARSINGSAR NEYVELI LIG CORP LTD THERMAL-LIG 25000 127520 38040
STATE SECTOR
PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 21000 14222 48200
PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 21000 19205 48400
PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 25000 102257 42600
PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 25000 62107 41800
DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 60000 312213 41000
RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 120000 35767442200
WYC HYDEL STATION HPGCL HYDRO-HYDRO 6240 20365 24900
GIRI POWER HOUSE HPSEB HYDRO-HYDRO 6000 13958 7600
ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 1695 5467 11900
BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 12000 18528 6700
GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 2250 7462 22500
BASSI POWER HOUSE HPSEB HYDRO-HYDRO 6600 29649 7500
BINWA POWER HOUSE HPSEB HYDRO-HYDRO 600 2749 19300
ANNEXURE-I
RATE OF SALE OF POWER FOR THE YEAR 2016-2017
Page 33
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) GAJ POWER HOUSE HPSEB HYDRO-HYDRO 1050 2914 26700
BANER POWER HOUSE HPSEB HYDRO-HYDRO 1200 2864 16200
HOLI POWER HOUSE HPSEB HYDRO-HYDRO 300 616 22500
THIROT POWER HOUSE HPSEB HYDRO-HYDRO 450 1126 22500
KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 1200 3064 22500
LARJI POWER HOUSE HPSEB HYDRO-HYDRO 12600 53677 23700
NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 250 750 31000
CHABA POWER HOUSE HPSEB HYDRO-HYDRO 175 465 23300
RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 150 101 13400
SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 200 000 22500
KILLAR HPSEB HYDRO-HYDRO 030 050 22500
BHABA AUGUMENP H HPSEB HYDRO-HYDRO 450 1276 22500
BS CHAMBA HPSEB HYDRO-HYDRO 045 099 19500
GUMMA HPSEB HYDRO-HYDRO 300 423 22500
GAS TURBINE POWER STATION IPGCL THERMAL-GAS 27000 67233 39300
PPS-I PPCL THERMAL-GAS 33000 175905 38300
PPS-III PPCL THERMAL-GAS 137120 196879 36100
LOWER JHELUM JampKPDD HYDRO-HYDRO 10500 60214 5100
UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 2260 10514 6300
UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 10500 44202 8500
GANDHARBAL JampKPDD HYDRO-HYDRO 1500 8925 4700
KARNAH MPH JampKPDD HYDRO-HYDRO 200 1122 31000
CHENANI I JampKPDD HYDRO-HYDRO 2330 10892 6600
CHENANI II JampKPDD HYDRO-HYDRO 200 1188 9300
CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 750 3634 14200
IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 375 2108 18500
IGO MERCHELLONG JampKPDD HYDRO-HYDRO 300 1572 29700
PAHALGAM MHP JampKPDD HYDRO-HYDRO 450 1713 32900
MARPACHOO JampKPDD HYDRO-HYDRO 075 375 29800
HAFTAL JampKPDD HYDRO-HYDRO 100 483 28700
SANJAK JampKPDD HYDRO-HYDRO 126 441 36000
SEWA-III JampKPDD HYDRO-HYDRO 900 3273 20200
BHADERWAH JampKPDD HYDRO-HYDRO 150 935 8900
BAZGO JampKPDD HYDRO-HYDRO 030 108 33300
SUMOOR JampKPDD HYDRO-HYDRO 010 045 35400
HUNDER JampKPDD HYDRO-HYDRO 040 176 26200
STAKNA JampKPDD HYDRO-HYDRO 400 1933 4100
KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 124000 662879 31360
SURATGARH TPS RRVUNL THERMAL-COAL 150000 402328 41730
CHHABRA TPS 1amp 2 RRVUNL THERMAL-COAL 50000 305946 36700
CHHABRA TPS 3 RRVUNL THERMAL-COAL 25000 151536 36700
CHHABRA TPS 4 RRVUNL THERMAL-COAL 25000 155896 36700
RAMGARH GT POWER PROJECT RRVUNL THERMAL-COAL 22050 43177 41800
RAMGARH GAS T P PROJECT 3 RRVUNL THERMAL-GAS 5000 93615 41800
DHOLPUR C C POWER PROJECT RRVUNL THERMAL-R-LNG 33000 9486 46110
MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 14000 20855 34192
MINI MICRO HYDEL (MMH) P S RRVUNL HYDRO-HYDRO 2385 851 37800
KALISINDH TPP 1 RRVUNL THERMAL-COAL 60000 341543 45000
KALISINDH TPP 2 RRVUNL THERMAL-COAL 60000 211588 45000
KHARA HEP UPJVNL HYDRO-HYDRO 7200 26654 7200
MATATILLA HEP UPJVNL HYDRO-HYDRO 3060 12219 6500
OBRA HEP UPJVNL HYDRO-HYDRO 9900 21517 6300
RIHAND UPJVNL HYDRO-HYDRO 30000 57369 5500
ANPARA A TPS UPRVUNL THERMAL-COAL 63000 317536 27000
ANPARA B TPS UPRVUNL THERMAL-COAL 100000 705605 22700
ANPARA D UPRVUNL THERMAL-COAL 100000 300158 39800
HARDUAGANJ TPS UPRVUNL THERMAL-COAL 16500 45817 49200
HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 50000 304389 46600
OBRA A TPS UPRVUNL THERMAL-COAL 28800 13158 34000
OBRA B TPS UPRVUNL THERMAL-COAL 100000 328124 21900
Page 34
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) PANKI TPS UPRVUNL THERMAL-COAL 21000 66488 50300
PARICHHA TPS UPRVUNL THERMAL-COAL 22000 38762 49400
PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 42000 231931 45600
PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 50000 276722 50400
CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 24000 70845 8290
CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 14400 75366 8390
DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 3375 9595 12080
DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 5100 18701 10520
KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4140 17359 12330
KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 12000 33001 9420
KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 3000 11953 8320
TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 9000 33983 12460
MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 30400 124510 16110
RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 19800 17897 10550
MPUR UTTARAKHAND JVNL HYDRO-HYDRO 930 5121 19200
PATHRI UTTARAKHAND JVNL HYDRO-HYDRO 2040 11636 14200
GALOGI UTTARAKHAND JVNL HYDRO-HYDRO 300 648 12500
PRIVATE SECTOR
MGTPP CLP INDIA PVT LTD THERMAL-COAL 132000 268902 41940
SHRINAGAR HEP ALAKNANDA HPCL HYDRO-HYDRO 33000 127414 48800
GAMA INFRAPROP CCPP GAMA INFRAPROP PVT THERMAL-GAS 22500 52686 47000
PPGCL (BARA) JP POWER VENTURES LTD THERMAL-COAL 198000 448200 38500
MALANA HEP MALANA PCL HYDRO-HYDRO 8600 26354 29792
MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 10000 30369 32580
ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 19200 56347 36079
KASHANG HEP H P PCL HYDRO-HYDRO 19500 5034 29200
BASPA-II HEP HBPCL HYDRO-HYDRO 30000 132769 13600
KARCHAM WANGTOO HEP HBPCL HYDRO-HYDRO 100000 434386 36600
RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 108000 582600 43700
RITHALA COMBI CY POWER PLANT TATA POWER DDL THERMAL-GAS 9480 000 11900
RAJPURA TPS NABHA POWER LTD THERMAL-GAS 140000 901484 39000
TALWANDI SABO POWER LTD TALWANDI SABO POWER LTD THERMAL-COAL 198000 636040 49548
ROJA THERMAL POWER STATION ROJA POWER SCL THERMAL-COAL 120000 727200 43400
KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 34400 63400
BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 36000 62600
MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 38200 60800
UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 37900 61500
KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 42300 58800
LALITPUR PGCL BAJAJ ENERGY PVT LTD THERMAL-COAL 198000 359400 47300
PRAYAGRAJ PGCL PRAYAGRAJ PGCL THERMAL-COAL 132000 448200 38595
KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 132000 783182 33438
WESTERN REGION
CENTRAL SECTOR
INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 100000 325333 23892
OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 52000 141663 34001
GANDHAR CCPP NTPC LTD THERMAL-GAS 65739 221924 28700
KAWAS CCPP NTPC LTD THERMAL-GASN 65620 167929 27000
KORBA I amp II NTPC LTD THERMAL-COAL 210000 1499171 20500
KORBA III NTPC LTD THERMAL-COAL 50000 358746 26600
SIPAT STPS I NTPC LTD THERMAL-COAL 198000 1479902 26800
SIPAT STPS II NTPC LTD THERMAL-COAL 100000 766549 26500
VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 126000 693142 25800
VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 100000 608781 23800
VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 100000 673475 27600
VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 100000 655924 32900
VINDHYACHAL STPS V NTPC LTD THERMAL-COAL 50000 328265 31700
MOUDA I NTPC LTD THERMAL-COAL 100000 343130 44500
MOUDA Ii NTPC LTD THERMAL-COAL 66000 40637 39900
RATNAGIRI GAS amp POWER PVT LTD RGPPL THERMAL-GAS 196708 442485 47000
KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 000 24729
TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 32000 201227 10740
Page 35
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 365122 19069
TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 787444 29324
STATE SECTOR
GSEG-HAZIRA15610 MW GUJARAT S ENEGEN LTD THERMAL-GAS 15610 1805 28200
GSEG-HAZIRA35143 MW GUJARAT S ENEGEN LTD THERMAL-GAS 35130 22276 51300
GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 21978 51800
AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 13929 26100
KORBA TPS EAST CSPGCL THERMAL-COAL 44000 198673 33880
DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 365808 27570
KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 316500 30420
HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 532878 19410
CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 515 58300
MTTPS CHAMPA U-I CSPGCL THERMAL-COAL 50000 220376 39000
MTTPS CHAMPA U-II CSPGCL THERMAL-COAL 50000 23709 10000
SHP GANGREL CSPGCL HYDRO-HYDRO 1000 2350 36790
BANGO HEP CSPGCL HYDRO-HYDRO 12000 14662 8900
MHP KORBA WEST CSPGCL HYDRO-HYDRO 170 859 38190
SIKASAR HEP CSPGCL HYDRO-HYDRO 700 418 26870
DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8843 74500
DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 19446 51500
GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 66388 71600
GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127488 41300
KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 96072 43900
KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 29841 56400
SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 184966 58800
UKAI 1-5 GSECL THERMAL-COAL 85000 204891 46900
UKAI TPS 6 GSECL THERMAL-COAL 50000 284448 48200
WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 271999 58300
WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 82808 44100
KADANA HPS GSECL HYDRO-HYDRO 24200 34433 16800
UKAI HPS GSECL HYDRO-HYDRO 30500 40585 6100
TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 123000 11500
BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 8900 10900
BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 7200 27500
JHINNA HPS MPPGCL HYDRO-HYDRO 2000 9700 18500
RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 44300 3400
GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 17300 4600
SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 4100 16900
MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 14600 27000
PENCH HPS MPPGCL HYDRO-HYDRO 16000 23700 8100
RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 3000 16900
AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 134400 35100
SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 283800 38700
SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 344600 34300
SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 111600 61600
SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 211800 58000
SSTPS PH-I MPPGCL THERMAL-COAL 120000 233100 84300
BHUSAWAL TPS MSPGCL THERMAL-COAL 142000 566258 51100
CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1365682 33700
KHAPERKHEDA MSPGCL THERMAL-COAL 134000 706207 39100
KORADI TPS MSPGCL THERMAL-COAL 62000 443206 42000
NASIK TPS MSPGCL THERMAL-COAL 63000 297275 47000
PARLI TPS MSPGCL THERMAL-COAL 113000 175934 71600
PARAS MSPGCL THERMAL-COAL 50000 267931 38700
URAN CCPP MSPGCL THERMAL-GAS 67200 320330 30600
KOYANA MSPGCL HYDRO-HYDRO 195600 328155 13100
SMALL HYDRO POWER PLANTS MSPGCL HYDRO-HYDRO 45400 93062 30500
BHIRA MSPGCL HYDRO-HYDRO 8000 10046 8400
TILLARI MSPGCL HYDRO-HYDRO 8900 10584 3100
SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 233298 20500
SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 87633 20500
PRIVATE SECTOR
Page 36
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 81282 46750
JNSTPP(JAYPEE NIGRIE) JP POWER VENTURES LTD THERMAL-COAL 132000 726695 29310
MB POWER MB POWER THERMAL-COAL 120000 345632 38310
ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 754922 28671
ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 780761 23495
ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 198000 1263784 32090
ADANI POWER MAHARA ADANI POWER LTD THERMAL-COAL 330000 1666191 34124
AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 170065 36827
SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 252035 45129
ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 458551 36000
ESSAR POWER MP LTD ESSAR POWER MP LTD THERMAL-COAL 60000 243040 28600
VEDANTA LTD (P P -I) VEDANTA LTD THERMAL-GAS 3000 15044 24000
VEDANTA LTD (P P -II) VEDANTA LTD THERMAL-GAS 3000 21293 24000
PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 8234600 24000
165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 5850 64390
145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 68717 40349
SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 132655 28776
SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 144686 38567
MUNDRA UMPPCOASTAL GUJARAT POWER
LTD THERMAL-IMP COAL 400000 2530300
23900
LANCO AMARKANTAK TPP PATHADIH
U-ILANCO AMARKAN POWER LTD THERMAL-COAL 30000 195500
29200
LANCO AMARKANTAK TPP PATHADIH
U-IILANCO AMARKAN POWER LTD THERMAL-COAL 30000 206900
27600
BARADARHA TPS D B POWER LTD THERMAL-COAL 120000 677373 29200
JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 405000 28900
JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 453000 40500
DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 339437 40700
TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 293400 44000
TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 137200 37000
TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 174900 44000
BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 92900 14100
BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23700 34300
KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 27600 48300
CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2530300 23900
BHANDARDRA HEP -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 2475 54900
SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 161400 26500
SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 445000 39000
SOTHERN REGION
CENTRAL SECTOR
NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 325699 54820
NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 305532 39880
NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 998805 38510
NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 113016 54070
NEYVELI TAMILNADU POWER LTD JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 625274 42200
VALLUR TPS NTPC TECL THERMAL-COAL 150000 856438 42350
R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 1493 84300
RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1502919 29400
RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 341291 31800
SIMHADRI I NTPC LTD THERMAL-COAL 100000 688382 36800
SIMHADRI II NTPC LTD THERMAL-COAL 100000 663657 43400
KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 593110 31324
MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 291625 21764
KKNPP-1 amp 2 NPCIL NUCLEAR-NUCLEAR 200000 572609 40948
MINICOY LAKSHADEEP THERMAL-DIESEL 340 770 29600
KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1097 29600
AMINI LAKSHADEEP THERMAL-DIESEL 265 509 29600
ANDROTT LAKSHADEEP THERMAL-DIESEL 219 524 29600
KALPENI LAKSHADEEP THERMAL-DIESEL 175 356 29600
AGATTI LAKSHADEEP THERMAL-DIESEL 195 658 29600
KADMAT LAKSHADEEP THERMAL-DIESEL 190 414 29600
KILTAN LAKSHADEEP THERMAL-DIESEL 150 269 29600
CHETLET LAKSHADEEP THERMAL-DIESEL 100 139 29600
BITRA LAKSHADEEP THERMAL-DIESEL 043 024 29600
BANGARAM LAKSHADEEP THERMAL-DIESEL 018 009 29600
Page 37
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) STATE SECTOR
Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 721811 46500
Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 50000 336142 46500
RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 237358 46500
RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 239926 46500
RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 124500 46500
SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 62109 46500
UPPER SILERU APGENCO HYDRO-HYDRO 24000 33000 46500
LOWER SILERU APGENCO HYDRO-HYDRO 46000 81066 46500
DONKARAI APGENCO HYDRO-HYDRO 2500 6007 46500
PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 1262 46500
CHETTIPETA APGENCO HYDRO-HYDRO 100 214 46500
MUCHKUND APGENCO HYDRO-HYDRO 12000 37571 46500
NAGARJUNASAGAR RCPH APGENCO HYDRO-HYDRO 9000 606 46500
TUNGABHADRA HES amp HAMPI(AP
Share)
APGENCO HYDRO-HYDRO 7200 6100 46500
KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 352232 42600
KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 288131 32500
KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 319272 46500
RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 40073 44300
KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 308317 46000
KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 308963 51300
SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 61004 76600
NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 17960 75300
PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 20873 58300
POCHAMPAD-I TSPGENCO HYDRO-HYDRO 2700 5455 29800
POCHAMPAD-II TSPGENCO HYDRO-HYDRO 900 1932 40700
NIZAMSAGAR TSPGENCO HYDRO-HYDRO 1000 1126 53400
RAICHUR TPS 1 to 7 KPCL THERMAL-COAL 147000 890866 43800
RAICHUR TPS 8 KPCL THERMAL-COAL 25000 159523 48200
BELLARI TPS 1 KPCL THERMAL-COAL 50000 318679 51100
BELLARI TPS 2 KPCL THERMAL-COAL 50000 232347 55600
BELLARI TPS 3 KPCL THERMAL-COAL 70000 47565 34400
BHADRA PH KPCL HYDRO-HYDRO 3920 2369 45900
GERUSUPPA PH KPCL HYDRO-HYDRO 24000 26990 22000
GHAT PRABHA HEP KPCL HYDRO-HYDRO 3200 4777 25300
KADRA HPS KPCL HYDRO-HYDRO 15000 16889 26800
NAGJHARI KPCL HYDRO-HYDRO 90000 155159 9800
KODASALLI DPH KPCL HYDRO-HYDRO 12000 14854 19200
MUNIRA+MGH+SPH+SPH KPCL HYDRO-HYDRO 22640 48211 7900
SHARAVATHY HPS KPCL HYDRO-HYDRO 108550 276215 5400
ALMATTI DPH KPCL HYDRO-HYDRO 29000 39611 24600
VARAHI UGPH KPCL HYDRO-HYDRO 46000 71368 15600
IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 17196 15300
IDUKKI HPS KSEB HYDRO-HYDRO 78000 137905 15300
KAKKAD HPS KSEB HYDRO-HYDRO 5000 13063 15300
KALLADA HPS KSEB HYDRO-HYDRO 1500 4436 15300
KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 46544 15300
KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 635 15300
LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 30822 15300
MALANKARA HPS KSEB HYDRO-HYDRO 1050 2474 15300
MATTUPETTY KSEB HYDRO-HYDRO 200 230 15300
MALAMPUZHA KSEB HYDRO-HYDRO 250 063 15300
CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 864 15300
URUMI ST I amp II KSEB HYDRO-HYDRO 615 903 15300
LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 248 15300
NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7765 19625 15300
PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 16601 15300
PANNIAR HPS KSEB HYDRO-HYDRO 3240 6217 15300
PORINGALKUTHU KSEB HYDRO-HYDRO 3600 10052 15300
PORINGALKUTHU LBE KSEB HYDRO-HYDRO 1600 9438 15300
PEPPARA KSEB HYDRO-HYDRO 300 395 15300
POOZHITHODE KSEB HYDRO-HYDRO 480 1045 15300
Page 38
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) PEECHI KSEB HYDRO-HYDRO 125 040 15300
RANI-PERUNADU KSEB HYDRO-HYDRO 400 585 15300
SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 79783 15300
SENGULAM HPS KSEB HYDRO-HYDRO 5120 11558 15300
SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 16711 15300
VILANGAD KSEB HYDRO-HYDRO 750 1578 15300
BARAPOLE KSEB HYDRO-HYDRO 1500 1932 15300
VELLATHOOVAL KSEB HYDRO-HYDRO 360 305 15300
CHIM0NY KSEB HYDRO-HYDRO 250 156 15300
ADYANPARA KSEB HYDRO-HYDRO 350 501 15300
BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 554 15300
KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 3801 15300
KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 23132 32800
ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 14416 62280
METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 523970 62280
METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 321270 62280
NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 336575 62280
NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 591240 62280
TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 508966 62280
KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 30897 62280
VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 18720 90699 62280
KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 33593 62280
BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 1047 62280
PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 1250 62280
PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 330 62280
MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 4897 62280
MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 032 62280
KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15681 62280
KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 40608 62280
KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 21342 62280
KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 4717 62280
KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4322 62280
KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2399 62280
METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 4416 62280
METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 8035 62280
BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2187 62280
BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2359 62280
BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2511 62280
BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 1949 62280
BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 1819 62280
POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 172 62280
SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 241 62280
MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 026 62280
THIRUMOORTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 136 62280
PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 9309 62280
VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 353 62280
SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 4192 62280
PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 6571 62280
SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 1186 62280
SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6319 62280
ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 6122 62280
KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 28674 62280
SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 18381 62280
SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 4258 62280
KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 12680 62280
KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4201 62280
ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 000 62280
PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 19175 62280
AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 078 62280
BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 504 62280
BHAVANI KATTALAI (BKB)(IIIampIII BB I amp II)TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 5847 62280
PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 000 62280
Page 39
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) SRI DAMODARAM STPS APPDCL THERMAL-COAL 160000 808108 36300
PRIVATE SECTOR
KARUPPUR TANJORE LANCO TANJORE PCL THERMAL-GAS 12000 48096 28770
SIMHAPURI ENERGY LTD SIMHAPURI ENERGY LTD THERMAL-COAL 60000 143900 39100
JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 7111 45500
SBU 1 JSW ENERGY LTD
VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 26000 159100
43300
SBU 2 JSW ENERGY LTD
VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 60000 247900
42800
LANCO KPLLANCO KONDAPALLI POWER
LTDTHERMAL-GAS 36814 85060
25776
LANCO KPL STG -IILANCO KONDAPALLI POWER
LTDTHERMAL-GAS 36600 12979
46330
LANCO KPL STG -IIIALANCO KONDAPALLI POWER
LTDTHERMAL-GAS 37100 85710
46330
LANCO KPL STG -III BLANCO KONDAPALLI POWER
LTDTHERMAL-GAS 37100 43639
46330
HINDUJA NATIONAL PCL HINDUJA NATIONAL PCL THERMAL-COAL 104000 303000 38200
MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 121164 49940
UDUPI POWER COR LTD ADANI POWER LTD THERMAL-COAL 120000 754613 42500
SPECTRUM POWER GENERATION
LTD SPECTRUM PG LTD THERMAL-GASN 20525 9256812
34952
TAQA NEYVELI POWER COM PVT
LTD TAQA NEYVELI THERMAL-LIG 25000 5840
34500
ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 251000 51000
ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 207860 36800
GMR VEMAGIRI POWER GENERATION
LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 30117
46450
EASTERN REGION
CENTRAL SECTOR
MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 64675 53113
MTPS STAGE - II KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 39000 1432 69138
BOKARO `B` TPS DVC THERMAL-COAL 63000 145670 31539
MEJIA TPS U 1-3 DVC THERMAL-COAL 63000 348298 31552
MEJIA TPS U 4 DVC THERMAL-COAL 21000 116099 34997
MEJIA TPS U 5-6 DVC THERMAL-COAL 50000 276427 35976
MEJIA TPS U 7-8 DVC THERMAL-COAL 100000 552854 36991
DURGAPUR STEEL TPS DVC THERMAL-COAL 100000 665550 39323
DURGAPUR TPS DVC THERMAL-COAL 21000 59270 35416
RAGHUNATHPUR TPS DVC THERMAL-COAL 120000 201650 35326
MAITHON HYDEL STA DVC HYDRO-HYDRO 6320 12200 17984
CHANDRAPURA TPSU1-3 DVC THERMAL-COAL 42000 257610 35095
CHANDRAPURA TPSU7-8 DVC THERMAL-COAL 50000 306673 34987
KODERMA TPS DVC THERMAL-COAL 100000 380180 38131
PANCHET HPS DVC HYDRO-HYDRO 8000 13360 17984
TILLAYA HPS DVC HYDRO-HYDRO 400 1410 17984
RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34700 35400
TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 277300 23200
TLDP -III NHPC LTD HYDRO-HYDRO 13200 55400 62000
TLDP -IV NHPC LTD HYDRO-HYDRO 16000 60300 25600
FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 957219 33700
FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 308943 41000
BONGAINGAON TPS NTPC LTD THERMAL-COAL 25000 153663 58600
KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 542277 34200
KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 942591 34200
BARH-II NTPC LTD THERMAL-COAL 132000 728021 44500
TALCHER TPS NTPC LTD THERMAL-COAL 46000 335521 30100
TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 702319 25600
TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1436521 24700
STATE SECTOR
BTPS(RampM) BIHAR STATE PGCL THERMAL-COAL 22000 12142 39700
BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 98331 10602
HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 50593 9482
CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 19689 2605
RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 53192 6033
UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 147208 14637
Page 40
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 60353 4519
IB TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 288567 25000
J P H GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 210 038 61100
MEYONG CHU GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 400 1086 61100
TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 122667 38200
DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 214339 43321
KOLAGHAT THERMAL POWER
STATION
WEST BENGAL PDCL THERMAL-COAL 126000 538269 31603
BAKRESHWAR THERMAL POWER
PLANT
WEST BENGAL PDCL THERMAL-COAL 105000 634876 32154
BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 45000 166855 33299
SANTHALDIH THERMAL POWER
STATION
WEST BENGAL PDCL THERMAL-COAL 50000 336442 34932
SAGARDIGHI THERMAL POWER
PROJECT
WEST BENGAL PDCL THERMAL-COAL 160000 423121 34705
JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 20344 68900
RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 24559 68900
TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 4623 68900
PURULIA PUMPED STORAGE
PROJECT
WEST BENGAL SEDCL HYDRO-HYDRO 90000 108816 68900
MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2768 68900
PRIVATE SECTOR
CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 49474 20230
CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 555500 70200
HALDIA ENERGY HALDIA ENERGY LTD THERMAL-COAL 60000 371000 50400
DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3688 63400
KAMALANGA TPS GMR KAMALANGA ENERGY LTD THERMAL-COAL 105000547670
33300
ADHUNIK POWER U-1 ADHUNIK POWER THERMAL-COAL 27000 158 44060
ADHUNIK POWER U-2 ADHUNIK POWER THERMAL-COAL 27000 168 44250
VL-JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 332800 23622
JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 43000 45250
JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 71700 37030
JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 70700 35920
JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 71100 38870
JOJOBERA UNIT 5 TATA POWER COM LTD THERMAL-COAL 12000 79300 44560
JOJOBERA UNIT 6 TATA POWER COM LTD THERMAL-WHR 12000 83700 12840
IEL KALINGANAGAR U-I TATA POWER COM LTD THERMAL-WG 6750 33400 22500
IEL KALINGANAGAR U-II TATA POWER COM LTD THERMAL-WG 6750 34800 22500
MAITHON UNIT 1 amp 2 TATA POWER COM LTD THERMAL-COAL 105000 678000 36100
HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 27500 24340
HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 28400 24340
HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 15800 24310
NORTH EASTERN REGION
CENTRAL SECTOR
LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 74100 36600
AGARTALA GT NEEPCO THERMAL-GAS 13500 88611 27210
ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 153111 32310
DOYANG HEP NEEPCO HYDRO-HYDRO 7500 25598 49801
KOPILI HEP NEEPCO HYDRO-HYDRO 20000 98186 11491
KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 19582 20237
KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 10310 17968
RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 124093 22945
TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 10100 17344 39000
STATE SECTOR
HYDRO POWER (122 Stns) ITANAGAR GOVT OF ARUNACHAL
PRADESHHYDRO-HYDRO 6971 6217270
24600
KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39514 17337
LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 82327 36810
NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 33318 48290
MYNTRIANG SHEP ST II ASSAM POWER GENCO HYDRO-HYDRO 300 567 35776
LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 9130 49200
LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 012 49200
DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 022 49200
TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 000 49200
UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 4990 16000
UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 6476 37000
UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 16494 14600
UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 3600 9556 15000
SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 758 8000
MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44070 44800
KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 154 41400
TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 091 41400
MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 411 41400
MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 394 41400
KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 760 41400
SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 3264 41400
LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 044 41400
BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 18953 28000
ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 43585 28200
GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 4080 11100
Note
LIG Lignite N Naptha WHR Waste Heat Recovery
Page 41
File NoCEA-CH-14-1142018-Coordination Division
Sl
NoExecuting Agency
Installed
Capacity (MW)Cost (Rs crore)
Date of
Clearance
32
No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification
since 2004-05
65291374575 296361511th Plan
Cumu upto End of 11th Plan
596556 21212860
557439Cummulative up to end of 12th Plan
46708
18423975
499150
2003-042004-05
5743
9769
Cumu upto End of 10th Plan
010407 to 310308
010410 to 310311557976840909
010411 to 310312
412667
86293726
3207
482864
12632
1576036
4451722594
15455554
2314176
397343611750
2093311060316074
65109527813884
6 Growth Of Rural Electrification amp Pumpsets Energisation
Plan Year
9th Plan2002-03
134092626
4111
Pump Sets Energised Villages Electricfied (Nos)
2001-02
284064367244
1218
27801997-981998-991999-002000-01
297594
010408 to 310309010409 to 310310
10th Plan
2005-062006-07
322968331020
Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as
Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received
from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made
available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified
villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is
independent of the earlier published reports
No Hydro Electric Project has been issued concurrenceAppraisal letter by CEA during October 2018
7 Status of Hydro Schemes Cleared by the CEA in Oct-2018
Name of Scheme
File NoCEA-CH-14-1142018-Coordination Division
SN Contents Page
1 Rate of sale of power for the year 2016-17 33-41
RATE OF SALE OF POWER FOR THE YEAR 2016-17
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) NORTHERN REGION
CENTRAL SECTOR
BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 18000 66900 19800
CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 54000 222400 21600
CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 30000 144400 19600
CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 23100 91700 42600
PARBATI - III HPS NHPC LTD HYDRO-HYDRO 52000 68200 54800
DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 28000 95600 30000
CHUTAK NHPC LTD HYDRO-HYDRO 4400 22000 79800
DULHASTI HPS NHPC LTD HYDRO-HYDRO 39000 228000 56400
SALAL HPS NHPC LTD HYDRO-HYDRO 69000 342300 11000
TANAKPUR HPS NHPC LTD HYDRO-HYDRO 9420 43000 29600
URI HPS -I NHPC LTD HYDRO-HYDRO 48000 280300 16000
URI HPS - II NHPC LTD HYDRO-HYDRO 24000 147300 48600
NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 4500 24600 88200
SEWA - II NHPC LTD HYDRO-HYDRO 12000 47100 43400
ANTA CCPP NTPC LTD THERMAL-GASN 41930 67539 32400
AURAIYA CCPP NTPC LTD THERMAL-GASN 66336 53501 39100
BADARPUR TPS NTPC LTD THERMAL-COAL 70500 159153 44800
DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 84000 296170 42300
DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 98000 526686 46300
DADRI CCPP NTPC LTD THERMAL-GASHSD 82978 227469 33000
FARIDABAD CCPP NTPC LTD THERMAL-GASN 43159 115577 30800
RIHAND STPS I NTPC LTD THERMAL-COAL 100000 596766 24500
RIHAND STPS II NTPC LTD THERMAL-COAL 100000 737069 24600
RIHAND STPS III NTPC LTD THERMAL-COAL 100000 706546 30600
SINGRAULI STPS NTPC LTD THERMAL-COAL 200000 1394068 20400
TANDA TPS NTPC LTD THERMAL-COAL 44000 295438 40800
UNCHAHAR TPS I NTPC LTD THERMAL-COAL 42000 256454 39800
UNCHAHAR TPS II NTPC LTD THERMAL-COAL 42000 273577 38900
UNCHAHAR TPS III NTPC LTD THERMAL-COAL 21000 142780 43000
KOLDAM NTPC LTD HYDRO-HYDRO 80000 363260 43600
NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 303575 25841
RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 108000 668677 35374
NJHPS SJVNL HYDRO-HYDRO 150000 699496 23820
RAMPUR HPS SJVNL HYDRO-HYDRO 41202 195982 32260
TEHRI HPP THDC HYDRO-HYDRO 100000 272543 51800
KOTESHWAR HEP THDC HYDRO-HYDRO 40000 106244 53400
IGSTPS JHAJJAR ARAVALI P CPL THERMAL-COAL 150000 510429 49490
NEYVELI BARSINGSAR NEYVELI LIG CORP LTD THERMAL-LIG 25000 127520 38040
STATE SECTOR
PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 21000 14222 48200
PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 21000 19205 48400
PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 25000 102257 42600
PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 25000 62107 41800
DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 60000 312213 41000
RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 120000 35767442200
WYC HYDEL STATION HPGCL HYDRO-HYDRO 6240 20365 24900
GIRI POWER HOUSE HPSEB HYDRO-HYDRO 6000 13958 7600
ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 1695 5467 11900
BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 12000 18528 6700
GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 2250 7462 22500
BASSI POWER HOUSE HPSEB HYDRO-HYDRO 6600 29649 7500
BINWA POWER HOUSE HPSEB HYDRO-HYDRO 600 2749 19300
ANNEXURE-I
RATE OF SALE OF POWER FOR THE YEAR 2016-2017
Page 33
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) GAJ POWER HOUSE HPSEB HYDRO-HYDRO 1050 2914 26700
BANER POWER HOUSE HPSEB HYDRO-HYDRO 1200 2864 16200
HOLI POWER HOUSE HPSEB HYDRO-HYDRO 300 616 22500
THIROT POWER HOUSE HPSEB HYDRO-HYDRO 450 1126 22500
KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 1200 3064 22500
LARJI POWER HOUSE HPSEB HYDRO-HYDRO 12600 53677 23700
NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 250 750 31000
CHABA POWER HOUSE HPSEB HYDRO-HYDRO 175 465 23300
RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 150 101 13400
SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 200 000 22500
KILLAR HPSEB HYDRO-HYDRO 030 050 22500
BHABA AUGUMENP H HPSEB HYDRO-HYDRO 450 1276 22500
BS CHAMBA HPSEB HYDRO-HYDRO 045 099 19500
GUMMA HPSEB HYDRO-HYDRO 300 423 22500
GAS TURBINE POWER STATION IPGCL THERMAL-GAS 27000 67233 39300
PPS-I PPCL THERMAL-GAS 33000 175905 38300
PPS-III PPCL THERMAL-GAS 137120 196879 36100
LOWER JHELUM JampKPDD HYDRO-HYDRO 10500 60214 5100
UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 2260 10514 6300
UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 10500 44202 8500
GANDHARBAL JampKPDD HYDRO-HYDRO 1500 8925 4700
KARNAH MPH JampKPDD HYDRO-HYDRO 200 1122 31000
CHENANI I JampKPDD HYDRO-HYDRO 2330 10892 6600
CHENANI II JampKPDD HYDRO-HYDRO 200 1188 9300
CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 750 3634 14200
IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 375 2108 18500
IGO MERCHELLONG JampKPDD HYDRO-HYDRO 300 1572 29700
PAHALGAM MHP JampKPDD HYDRO-HYDRO 450 1713 32900
MARPACHOO JampKPDD HYDRO-HYDRO 075 375 29800
HAFTAL JampKPDD HYDRO-HYDRO 100 483 28700
SANJAK JampKPDD HYDRO-HYDRO 126 441 36000
SEWA-III JampKPDD HYDRO-HYDRO 900 3273 20200
BHADERWAH JampKPDD HYDRO-HYDRO 150 935 8900
BAZGO JampKPDD HYDRO-HYDRO 030 108 33300
SUMOOR JampKPDD HYDRO-HYDRO 010 045 35400
HUNDER JampKPDD HYDRO-HYDRO 040 176 26200
STAKNA JampKPDD HYDRO-HYDRO 400 1933 4100
KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 124000 662879 31360
SURATGARH TPS RRVUNL THERMAL-COAL 150000 402328 41730
CHHABRA TPS 1amp 2 RRVUNL THERMAL-COAL 50000 305946 36700
CHHABRA TPS 3 RRVUNL THERMAL-COAL 25000 151536 36700
CHHABRA TPS 4 RRVUNL THERMAL-COAL 25000 155896 36700
RAMGARH GT POWER PROJECT RRVUNL THERMAL-COAL 22050 43177 41800
RAMGARH GAS T P PROJECT 3 RRVUNL THERMAL-GAS 5000 93615 41800
DHOLPUR C C POWER PROJECT RRVUNL THERMAL-R-LNG 33000 9486 46110
MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 14000 20855 34192
MINI MICRO HYDEL (MMH) P S RRVUNL HYDRO-HYDRO 2385 851 37800
KALISINDH TPP 1 RRVUNL THERMAL-COAL 60000 341543 45000
KALISINDH TPP 2 RRVUNL THERMAL-COAL 60000 211588 45000
KHARA HEP UPJVNL HYDRO-HYDRO 7200 26654 7200
MATATILLA HEP UPJVNL HYDRO-HYDRO 3060 12219 6500
OBRA HEP UPJVNL HYDRO-HYDRO 9900 21517 6300
RIHAND UPJVNL HYDRO-HYDRO 30000 57369 5500
ANPARA A TPS UPRVUNL THERMAL-COAL 63000 317536 27000
ANPARA B TPS UPRVUNL THERMAL-COAL 100000 705605 22700
ANPARA D UPRVUNL THERMAL-COAL 100000 300158 39800
HARDUAGANJ TPS UPRVUNL THERMAL-COAL 16500 45817 49200
HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 50000 304389 46600
OBRA A TPS UPRVUNL THERMAL-COAL 28800 13158 34000
OBRA B TPS UPRVUNL THERMAL-COAL 100000 328124 21900
Page 34
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) PANKI TPS UPRVUNL THERMAL-COAL 21000 66488 50300
PARICHHA TPS UPRVUNL THERMAL-COAL 22000 38762 49400
PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 42000 231931 45600
PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 50000 276722 50400
CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 24000 70845 8290
CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 14400 75366 8390
DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 3375 9595 12080
DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 5100 18701 10520
KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4140 17359 12330
KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 12000 33001 9420
KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 3000 11953 8320
TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 9000 33983 12460
MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 30400 124510 16110
RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 19800 17897 10550
MPUR UTTARAKHAND JVNL HYDRO-HYDRO 930 5121 19200
PATHRI UTTARAKHAND JVNL HYDRO-HYDRO 2040 11636 14200
GALOGI UTTARAKHAND JVNL HYDRO-HYDRO 300 648 12500
PRIVATE SECTOR
MGTPP CLP INDIA PVT LTD THERMAL-COAL 132000 268902 41940
SHRINAGAR HEP ALAKNANDA HPCL HYDRO-HYDRO 33000 127414 48800
GAMA INFRAPROP CCPP GAMA INFRAPROP PVT THERMAL-GAS 22500 52686 47000
PPGCL (BARA) JP POWER VENTURES LTD THERMAL-COAL 198000 448200 38500
MALANA HEP MALANA PCL HYDRO-HYDRO 8600 26354 29792
MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 10000 30369 32580
ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 19200 56347 36079
KASHANG HEP H P PCL HYDRO-HYDRO 19500 5034 29200
BASPA-II HEP HBPCL HYDRO-HYDRO 30000 132769 13600
KARCHAM WANGTOO HEP HBPCL HYDRO-HYDRO 100000 434386 36600
RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 108000 582600 43700
RITHALA COMBI CY POWER PLANT TATA POWER DDL THERMAL-GAS 9480 000 11900
RAJPURA TPS NABHA POWER LTD THERMAL-GAS 140000 901484 39000
TALWANDI SABO POWER LTD TALWANDI SABO POWER LTD THERMAL-COAL 198000 636040 49548
ROJA THERMAL POWER STATION ROJA POWER SCL THERMAL-COAL 120000 727200 43400
KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 34400 63400
BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 36000 62600
MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 38200 60800
UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 37900 61500
KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 42300 58800
LALITPUR PGCL BAJAJ ENERGY PVT LTD THERMAL-COAL 198000 359400 47300
PRAYAGRAJ PGCL PRAYAGRAJ PGCL THERMAL-COAL 132000 448200 38595
KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 132000 783182 33438
WESTERN REGION
CENTRAL SECTOR
INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 100000 325333 23892
OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 52000 141663 34001
GANDHAR CCPP NTPC LTD THERMAL-GAS 65739 221924 28700
KAWAS CCPP NTPC LTD THERMAL-GASN 65620 167929 27000
KORBA I amp II NTPC LTD THERMAL-COAL 210000 1499171 20500
KORBA III NTPC LTD THERMAL-COAL 50000 358746 26600
SIPAT STPS I NTPC LTD THERMAL-COAL 198000 1479902 26800
SIPAT STPS II NTPC LTD THERMAL-COAL 100000 766549 26500
VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 126000 693142 25800
VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 100000 608781 23800
VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 100000 673475 27600
VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 100000 655924 32900
VINDHYACHAL STPS V NTPC LTD THERMAL-COAL 50000 328265 31700
MOUDA I NTPC LTD THERMAL-COAL 100000 343130 44500
MOUDA Ii NTPC LTD THERMAL-COAL 66000 40637 39900
RATNAGIRI GAS amp POWER PVT LTD RGPPL THERMAL-GAS 196708 442485 47000
KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 000 24729
TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 32000 201227 10740
Page 35
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 365122 19069
TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 787444 29324
STATE SECTOR
GSEG-HAZIRA15610 MW GUJARAT S ENEGEN LTD THERMAL-GAS 15610 1805 28200
GSEG-HAZIRA35143 MW GUJARAT S ENEGEN LTD THERMAL-GAS 35130 22276 51300
GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 21978 51800
AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 13929 26100
KORBA TPS EAST CSPGCL THERMAL-COAL 44000 198673 33880
DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 365808 27570
KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 316500 30420
HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 532878 19410
CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 515 58300
MTTPS CHAMPA U-I CSPGCL THERMAL-COAL 50000 220376 39000
MTTPS CHAMPA U-II CSPGCL THERMAL-COAL 50000 23709 10000
SHP GANGREL CSPGCL HYDRO-HYDRO 1000 2350 36790
BANGO HEP CSPGCL HYDRO-HYDRO 12000 14662 8900
MHP KORBA WEST CSPGCL HYDRO-HYDRO 170 859 38190
SIKASAR HEP CSPGCL HYDRO-HYDRO 700 418 26870
DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8843 74500
DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 19446 51500
GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 66388 71600
GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127488 41300
KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 96072 43900
KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 29841 56400
SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 184966 58800
UKAI 1-5 GSECL THERMAL-COAL 85000 204891 46900
UKAI TPS 6 GSECL THERMAL-COAL 50000 284448 48200
WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 271999 58300
WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 82808 44100
KADANA HPS GSECL HYDRO-HYDRO 24200 34433 16800
UKAI HPS GSECL HYDRO-HYDRO 30500 40585 6100
TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 123000 11500
BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 8900 10900
BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 7200 27500
JHINNA HPS MPPGCL HYDRO-HYDRO 2000 9700 18500
RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 44300 3400
GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 17300 4600
SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 4100 16900
MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 14600 27000
PENCH HPS MPPGCL HYDRO-HYDRO 16000 23700 8100
RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 3000 16900
AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 134400 35100
SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 283800 38700
SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 344600 34300
SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 111600 61600
SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 211800 58000
SSTPS PH-I MPPGCL THERMAL-COAL 120000 233100 84300
BHUSAWAL TPS MSPGCL THERMAL-COAL 142000 566258 51100
CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1365682 33700
KHAPERKHEDA MSPGCL THERMAL-COAL 134000 706207 39100
KORADI TPS MSPGCL THERMAL-COAL 62000 443206 42000
NASIK TPS MSPGCL THERMAL-COAL 63000 297275 47000
PARLI TPS MSPGCL THERMAL-COAL 113000 175934 71600
PARAS MSPGCL THERMAL-COAL 50000 267931 38700
URAN CCPP MSPGCL THERMAL-GAS 67200 320330 30600
KOYANA MSPGCL HYDRO-HYDRO 195600 328155 13100
SMALL HYDRO POWER PLANTS MSPGCL HYDRO-HYDRO 45400 93062 30500
BHIRA MSPGCL HYDRO-HYDRO 8000 10046 8400
TILLARI MSPGCL HYDRO-HYDRO 8900 10584 3100
SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 233298 20500
SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 87633 20500
PRIVATE SECTOR
Page 36
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 81282 46750
JNSTPP(JAYPEE NIGRIE) JP POWER VENTURES LTD THERMAL-COAL 132000 726695 29310
MB POWER MB POWER THERMAL-COAL 120000 345632 38310
ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 754922 28671
ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 780761 23495
ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 198000 1263784 32090
ADANI POWER MAHARA ADANI POWER LTD THERMAL-COAL 330000 1666191 34124
AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 170065 36827
SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 252035 45129
ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 458551 36000
ESSAR POWER MP LTD ESSAR POWER MP LTD THERMAL-COAL 60000 243040 28600
VEDANTA LTD (P P -I) VEDANTA LTD THERMAL-GAS 3000 15044 24000
VEDANTA LTD (P P -II) VEDANTA LTD THERMAL-GAS 3000 21293 24000
PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 8234600 24000
165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 5850 64390
145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 68717 40349
SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 132655 28776
SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 144686 38567
MUNDRA UMPPCOASTAL GUJARAT POWER
LTD THERMAL-IMP COAL 400000 2530300
23900
LANCO AMARKANTAK TPP PATHADIH
U-ILANCO AMARKAN POWER LTD THERMAL-COAL 30000 195500
29200
LANCO AMARKANTAK TPP PATHADIH
U-IILANCO AMARKAN POWER LTD THERMAL-COAL 30000 206900
27600
BARADARHA TPS D B POWER LTD THERMAL-COAL 120000 677373 29200
JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 405000 28900
JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 453000 40500
DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 339437 40700
TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 293400 44000
TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 137200 37000
TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 174900 44000
BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 92900 14100
BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23700 34300
KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 27600 48300
CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2530300 23900
BHANDARDRA HEP -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 2475 54900
SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 161400 26500
SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 445000 39000
SOTHERN REGION
CENTRAL SECTOR
NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 325699 54820
NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 305532 39880
NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 998805 38510
NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 113016 54070
NEYVELI TAMILNADU POWER LTD JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 625274 42200
VALLUR TPS NTPC TECL THERMAL-COAL 150000 856438 42350
R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 1493 84300
RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1502919 29400
RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 341291 31800
SIMHADRI I NTPC LTD THERMAL-COAL 100000 688382 36800
SIMHADRI II NTPC LTD THERMAL-COAL 100000 663657 43400
KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 593110 31324
MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 291625 21764
KKNPP-1 amp 2 NPCIL NUCLEAR-NUCLEAR 200000 572609 40948
MINICOY LAKSHADEEP THERMAL-DIESEL 340 770 29600
KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1097 29600
AMINI LAKSHADEEP THERMAL-DIESEL 265 509 29600
ANDROTT LAKSHADEEP THERMAL-DIESEL 219 524 29600
KALPENI LAKSHADEEP THERMAL-DIESEL 175 356 29600
AGATTI LAKSHADEEP THERMAL-DIESEL 195 658 29600
KADMAT LAKSHADEEP THERMAL-DIESEL 190 414 29600
KILTAN LAKSHADEEP THERMAL-DIESEL 150 269 29600
CHETLET LAKSHADEEP THERMAL-DIESEL 100 139 29600
BITRA LAKSHADEEP THERMAL-DIESEL 043 024 29600
BANGARAM LAKSHADEEP THERMAL-DIESEL 018 009 29600
Page 37
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) STATE SECTOR
Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 721811 46500
Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 50000 336142 46500
RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 237358 46500
RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 239926 46500
RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 124500 46500
SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 62109 46500
UPPER SILERU APGENCO HYDRO-HYDRO 24000 33000 46500
LOWER SILERU APGENCO HYDRO-HYDRO 46000 81066 46500
DONKARAI APGENCO HYDRO-HYDRO 2500 6007 46500
PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 1262 46500
CHETTIPETA APGENCO HYDRO-HYDRO 100 214 46500
MUCHKUND APGENCO HYDRO-HYDRO 12000 37571 46500
NAGARJUNASAGAR RCPH APGENCO HYDRO-HYDRO 9000 606 46500
TUNGABHADRA HES amp HAMPI(AP
Share)
APGENCO HYDRO-HYDRO 7200 6100 46500
KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 352232 42600
KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 288131 32500
KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 319272 46500
RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 40073 44300
KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 308317 46000
KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 308963 51300
SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 61004 76600
NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 17960 75300
PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 20873 58300
POCHAMPAD-I TSPGENCO HYDRO-HYDRO 2700 5455 29800
POCHAMPAD-II TSPGENCO HYDRO-HYDRO 900 1932 40700
NIZAMSAGAR TSPGENCO HYDRO-HYDRO 1000 1126 53400
RAICHUR TPS 1 to 7 KPCL THERMAL-COAL 147000 890866 43800
RAICHUR TPS 8 KPCL THERMAL-COAL 25000 159523 48200
BELLARI TPS 1 KPCL THERMAL-COAL 50000 318679 51100
BELLARI TPS 2 KPCL THERMAL-COAL 50000 232347 55600
BELLARI TPS 3 KPCL THERMAL-COAL 70000 47565 34400
BHADRA PH KPCL HYDRO-HYDRO 3920 2369 45900
GERUSUPPA PH KPCL HYDRO-HYDRO 24000 26990 22000
GHAT PRABHA HEP KPCL HYDRO-HYDRO 3200 4777 25300
KADRA HPS KPCL HYDRO-HYDRO 15000 16889 26800
NAGJHARI KPCL HYDRO-HYDRO 90000 155159 9800
KODASALLI DPH KPCL HYDRO-HYDRO 12000 14854 19200
MUNIRA+MGH+SPH+SPH KPCL HYDRO-HYDRO 22640 48211 7900
SHARAVATHY HPS KPCL HYDRO-HYDRO 108550 276215 5400
ALMATTI DPH KPCL HYDRO-HYDRO 29000 39611 24600
VARAHI UGPH KPCL HYDRO-HYDRO 46000 71368 15600
IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 17196 15300
IDUKKI HPS KSEB HYDRO-HYDRO 78000 137905 15300
KAKKAD HPS KSEB HYDRO-HYDRO 5000 13063 15300
KALLADA HPS KSEB HYDRO-HYDRO 1500 4436 15300
KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 46544 15300
KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 635 15300
LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 30822 15300
MALANKARA HPS KSEB HYDRO-HYDRO 1050 2474 15300
MATTUPETTY KSEB HYDRO-HYDRO 200 230 15300
MALAMPUZHA KSEB HYDRO-HYDRO 250 063 15300
CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 864 15300
URUMI ST I amp II KSEB HYDRO-HYDRO 615 903 15300
LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 248 15300
NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7765 19625 15300
PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 16601 15300
PANNIAR HPS KSEB HYDRO-HYDRO 3240 6217 15300
PORINGALKUTHU KSEB HYDRO-HYDRO 3600 10052 15300
PORINGALKUTHU LBE KSEB HYDRO-HYDRO 1600 9438 15300
PEPPARA KSEB HYDRO-HYDRO 300 395 15300
POOZHITHODE KSEB HYDRO-HYDRO 480 1045 15300
Page 38
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) PEECHI KSEB HYDRO-HYDRO 125 040 15300
RANI-PERUNADU KSEB HYDRO-HYDRO 400 585 15300
SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 79783 15300
SENGULAM HPS KSEB HYDRO-HYDRO 5120 11558 15300
SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 16711 15300
VILANGAD KSEB HYDRO-HYDRO 750 1578 15300
BARAPOLE KSEB HYDRO-HYDRO 1500 1932 15300
VELLATHOOVAL KSEB HYDRO-HYDRO 360 305 15300
CHIM0NY KSEB HYDRO-HYDRO 250 156 15300
ADYANPARA KSEB HYDRO-HYDRO 350 501 15300
BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 554 15300
KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 3801 15300
KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 23132 32800
ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 14416 62280
METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 523970 62280
METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 321270 62280
NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 336575 62280
NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 591240 62280
TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 508966 62280
KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 30897 62280
VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 18720 90699 62280
KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 33593 62280
BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 1047 62280
PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 1250 62280
PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 330 62280
MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 4897 62280
MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 032 62280
KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15681 62280
KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 40608 62280
KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 21342 62280
KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 4717 62280
KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4322 62280
KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2399 62280
METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 4416 62280
METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 8035 62280
BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2187 62280
BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2359 62280
BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2511 62280
BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 1949 62280
BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 1819 62280
POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 172 62280
SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 241 62280
MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 026 62280
THIRUMOORTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 136 62280
PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 9309 62280
VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 353 62280
SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 4192 62280
PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 6571 62280
SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 1186 62280
SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6319 62280
ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 6122 62280
KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 28674 62280
SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 18381 62280
SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 4258 62280
KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 12680 62280
KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4201 62280
ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 000 62280
PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 19175 62280
AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 078 62280
BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 504 62280
BHAVANI KATTALAI (BKB)(IIIampIII BB I amp II)TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 5847 62280
PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 000 62280
Page 39
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) SRI DAMODARAM STPS APPDCL THERMAL-COAL 160000 808108 36300
PRIVATE SECTOR
KARUPPUR TANJORE LANCO TANJORE PCL THERMAL-GAS 12000 48096 28770
SIMHAPURI ENERGY LTD SIMHAPURI ENERGY LTD THERMAL-COAL 60000 143900 39100
JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 7111 45500
SBU 1 JSW ENERGY LTD
VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 26000 159100
43300
SBU 2 JSW ENERGY LTD
VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 60000 247900
42800
LANCO KPLLANCO KONDAPALLI POWER
LTDTHERMAL-GAS 36814 85060
25776
LANCO KPL STG -IILANCO KONDAPALLI POWER
LTDTHERMAL-GAS 36600 12979
46330
LANCO KPL STG -IIIALANCO KONDAPALLI POWER
LTDTHERMAL-GAS 37100 85710
46330
LANCO KPL STG -III BLANCO KONDAPALLI POWER
LTDTHERMAL-GAS 37100 43639
46330
HINDUJA NATIONAL PCL HINDUJA NATIONAL PCL THERMAL-COAL 104000 303000 38200
MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 121164 49940
UDUPI POWER COR LTD ADANI POWER LTD THERMAL-COAL 120000 754613 42500
SPECTRUM POWER GENERATION
LTD SPECTRUM PG LTD THERMAL-GASN 20525 9256812
34952
TAQA NEYVELI POWER COM PVT
LTD TAQA NEYVELI THERMAL-LIG 25000 5840
34500
ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 251000 51000
ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 207860 36800
GMR VEMAGIRI POWER GENERATION
LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 30117
46450
EASTERN REGION
CENTRAL SECTOR
MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 64675 53113
MTPS STAGE - II KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 39000 1432 69138
BOKARO `B` TPS DVC THERMAL-COAL 63000 145670 31539
MEJIA TPS U 1-3 DVC THERMAL-COAL 63000 348298 31552
MEJIA TPS U 4 DVC THERMAL-COAL 21000 116099 34997
MEJIA TPS U 5-6 DVC THERMAL-COAL 50000 276427 35976
MEJIA TPS U 7-8 DVC THERMAL-COAL 100000 552854 36991
DURGAPUR STEEL TPS DVC THERMAL-COAL 100000 665550 39323
DURGAPUR TPS DVC THERMAL-COAL 21000 59270 35416
RAGHUNATHPUR TPS DVC THERMAL-COAL 120000 201650 35326
MAITHON HYDEL STA DVC HYDRO-HYDRO 6320 12200 17984
CHANDRAPURA TPSU1-3 DVC THERMAL-COAL 42000 257610 35095
CHANDRAPURA TPSU7-8 DVC THERMAL-COAL 50000 306673 34987
KODERMA TPS DVC THERMAL-COAL 100000 380180 38131
PANCHET HPS DVC HYDRO-HYDRO 8000 13360 17984
TILLAYA HPS DVC HYDRO-HYDRO 400 1410 17984
RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34700 35400
TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 277300 23200
TLDP -III NHPC LTD HYDRO-HYDRO 13200 55400 62000
TLDP -IV NHPC LTD HYDRO-HYDRO 16000 60300 25600
FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 957219 33700
FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 308943 41000
BONGAINGAON TPS NTPC LTD THERMAL-COAL 25000 153663 58600
KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 542277 34200
KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 942591 34200
BARH-II NTPC LTD THERMAL-COAL 132000 728021 44500
TALCHER TPS NTPC LTD THERMAL-COAL 46000 335521 30100
TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 702319 25600
TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1436521 24700
STATE SECTOR
BTPS(RampM) BIHAR STATE PGCL THERMAL-COAL 22000 12142 39700
BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 98331 10602
HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 50593 9482
CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 19689 2605
RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 53192 6033
UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 147208 14637
Page 40
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 60353 4519
IB TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 288567 25000
J P H GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 210 038 61100
MEYONG CHU GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 400 1086 61100
TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 122667 38200
DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 214339 43321
KOLAGHAT THERMAL POWER
STATION
WEST BENGAL PDCL THERMAL-COAL 126000 538269 31603
BAKRESHWAR THERMAL POWER
PLANT
WEST BENGAL PDCL THERMAL-COAL 105000 634876 32154
BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 45000 166855 33299
SANTHALDIH THERMAL POWER
STATION
WEST BENGAL PDCL THERMAL-COAL 50000 336442 34932
SAGARDIGHI THERMAL POWER
PROJECT
WEST BENGAL PDCL THERMAL-COAL 160000 423121 34705
JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 20344 68900
RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 24559 68900
TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 4623 68900
PURULIA PUMPED STORAGE
PROJECT
WEST BENGAL SEDCL HYDRO-HYDRO 90000 108816 68900
MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2768 68900
PRIVATE SECTOR
CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 49474 20230
CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 555500 70200
HALDIA ENERGY HALDIA ENERGY LTD THERMAL-COAL 60000 371000 50400
DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3688 63400
KAMALANGA TPS GMR KAMALANGA ENERGY LTD THERMAL-COAL 105000547670
33300
ADHUNIK POWER U-1 ADHUNIK POWER THERMAL-COAL 27000 158 44060
ADHUNIK POWER U-2 ADHUNIK POWER THERMAL-COAL 27000 168 44250
VL-JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 332800 23622
JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 43000 45250
JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 71700 37030
JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 70700 35920
JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 71100 38870
JOJOBERA UNIT 5 TATA POWER COM LTD THERMAL-COAL 12000 79300 44560
JOJOBERA UNIT 6 TATA POWER COM LTD THERMAL-WHR 12000 83700 12840
IEL KALINGANAGAR U-I TATA POWER COM LTD THERMAL-WG 6750 33400 22500
IEL KALINGANAGAR U-II TATA POWER COM LTD THERMAL-WG 6750 34800 22500
MAITHON UNIT 1 amp 2 TATA POWER COM LTD THERMAL-COAL 105000 678000 36100
HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 27500 24340
HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 28400 24340
HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 15800 24310
NORTH EASTERN REGION
CENTRAL SECTOR
LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 74100 36600
AGARTALA GT NEEPCO THERMAL-GAS 13500 88611 27210
ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 153111 32310
DOYANG HEP NEEPCO HYDRO-HYDRO 7500 25598 49801
KOPILI HEP NEEPCO HYDRO-HYDRO 20000 98186 11491
KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 19582 20237
KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 10310 17968
RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 124093 22945
TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 10100 17344 39000
STATE SECTOR
HYDRO POWER (122 Stns) ITANAGAR GOVT OF ARUNACHAL
PRADESHHYDRO-HYDRO 6971 6217270
24600
KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39514 17337
LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 82327 36810
NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 33318 48290
MYNTRIANG SHEP ST II ASSAM POWER GENCO HYDRO-HYDRO 300 567 35776
LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 9130 49200
LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 012 49200
DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 022 49200
TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 000 49200
UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 4990 16000
UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 6476 37000
UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 16494 14600
UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 3600 9556 15000
SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 758 8000
MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44070 44800
KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 154 41400
TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 091 41400
MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 411 41400
MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 394 41400
KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 760 41400
SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 3264 41400
LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 044 41400
BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 18953 28000
ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 43585 28200
GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 4080 11100
Note
LIG Lignite N Naptha WHR Waste Heat Recovery
Page 41
File NoCEA-CH-14-1142018-Coordination Division
SN Contents Page
1 Rate of sale of power for the year 2016-17 33-41
RATE OF SALE OF POWER FOR THE YEAR 2016-17
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) NORTHERN REGION
CENTRAL SECTOR
BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 18000 66900 19800
CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 54000 222400 21600
CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 30000 144400 19600
CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 23100 91700 42600
PARBATI - III HPS NHPC LTD HYDRO-HYDRO 52000 68200 54800
DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 28000 95600 30000
CHUTAK NHPC LTD HYDRO-HYDRO 4400 22000 79800
DULHASTI HPS NHPC LTD HYDRO-HYDRO 39000 228000 56400
SALAL HPS NHPC LTD HYDRO-HYDRO 69000 342300 11000
TANAKPUR HPS NHPC LTD HYDRO-HYDRO 9420 43000 29600
URI HPS -I NHPC LTD HYDRO-HYDRO 48000 280300 16000
URI HPS - II NHPC LTD HYDRO-HYDRO 24000 147300 48600
NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 4500 24600 88200
SEWA - II NHPC LTD HYDRO-HYDRO 12000 47100 43400
ANTA CCPP NTPC LTD THERMAL-GASN 41930 67539 32400
AURAIYA CCPP NTPC LTD THERMAL-GASN 66336 53501 39100
BADARPUR TPS NTPC LTD THERMAL-COAL 70500 159153 44800
DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 84000 296170 42300
DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 98000 526686 46300
DADRI CCPP NTPC LTD THERMAL-GASHSD 82978 227469 33000
FARIDABAD CCPP NTPC LTD THERMAL-GASN 43159 115577 30800
RIHAND STPS I NTPC LTD THERMAL-COAL 100000 596766 24500
RIHAND STPS II NTPC LTD THERMAL-COAL 100000 737069 24600
RIHAND STPS III NTPC LTD THERMAL-COAL 100000 706546 30600
SINGRAULI STPS NTPC LTD THERMAL-COAL 200000 1394068 20400
TANDA TPS NTPC LTD THERMAL-COAL 44000 295438 40800
UNCHAHAR TPS I NTPC LTD THERMAL-COAL 42000 256454 39800
UNCHAHAR TPS II NTPC LTD THERMAL-COAL 42000 273577 38900
UNCHAHAR TPS III NTPC LTD THERMAL-COAL 21000 142780 43000
KOLDAM NTPC LTD HYDRO-HYDRO 80000 363260 43600
NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 303575 25841
RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 108000 668677 35374
NJHPS SJVNL HYDRO-HYDRO 150000 699496 23820
RAMPUR HPS SJVNL HYDRO-HYDRO 41202 195982 32260
TEHRI HPP THDC HYDRO-HYDRO 100000 272543 51800
KOTESHWAR HEP THDC HYDRO-HYDRO 40000 106244 53400
IGSTPS JHAJJAR ARAVALI P CPL THERMAL-COAL 150000 510429 49490
NEYVELI BARSINGSAR NEYVELI LIG CORP LTD THERMAL-LIG 25000 127520 38040
STATE SECTOR
PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 21000 14222 48200
PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 21000 19205 48400
PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 25000 102257 42600
PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 25000 62107 41800
DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 60000 312213 41000
RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 120000 35767442200
WYC HYDEL STATION HPGCL HYDRO-HYDRO 6240 20365 24900
GIRI POWER HOUSE HPSEB HYDRO-HYDRO 6000 13958 7600
ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 1695 5467 11900
BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 12000 18528 6700
GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 2250 7462 22500
BASSI POWER HOUSE HPSEB HYDRO-HYDRO 6600 29649 7500
BINWA POWER HOUSE HPSEB HYDRO-HYDRO 600 2749 19300
ANNEXURE-I
RATE OF SALE OF POWER FOR THE YEAR 2016-2017
Page 33
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) GAJ POWER HOUSE HPSEB HYDRO-HYDRO 1050 2914 26700
BANER POWER HOUSE HPSEB HYDRO-HYDRO 1200 2864 16200
HOLI POWER HOUSE HPSEB HYDRO-HYDRO 300 616 22500
THIROT POWER HOUSE HPSEB HYDRO-HYDRO 450 1126 22500
KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 1200 3064 22500
LARJI POWER HOUSE HPSEB HYDRO-HYDRO 12600 53677 23700
NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 250 750 31000
CHABA POWER HOUSE HPSEB HYDRO-HYDRO 175 465 23300
RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 150 101 13400
SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 200 000 22500
KILLAR HPSEB HYDRO-HYDRO 030 050 22500
BHABA AUGUMENP H HPSEB HYDRO-HYDRO 450 1276 22500
BS CHAMBA HPSEB HYDRO-HYDRO 045 099 19500
GUMMA HPSEB HYDRO-HYDRO 300 423 22500
GAS TURBINE POWER STATION IPGCL THERMAL-GAS 27000 67233 39300
PPS-I PPCL THERMAL-GAS 33000 175905 38300
PPS-III PPCL THERMAL-GAS 137120 196879 36100
LOWER JHELUM JampKPDD HYDRO-HYDRO 10500 60214 5100
UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 2260 10514 6300
UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 10500 44202 8500
GANDHARBAL JampKPDD HYDRO-HYDRO 1500 8925 4700
KARNAH MPH JampKPDD HYDRO-HYDRO 200 1122 31000
CHENANI I JampKPDD HYDRO-HYDRO 2330 10892 6600
CHENANI II JampKPDD HYDRO-HYDRO 200 1188 9300
CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 750 3634 14200
IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 375 2108 18500
IGO MERCHELLONG JampKPDD HYDRO-HYDRO 300 1572 29700
PAHALGAM MHP JampKPDD HYDRO-HYDRO 450 1713 32900
MARPACHOO JampKPDD HYDRO-HYDRO 075 375 29800
HAFTAL JampKPDD HYDRO-HYDRO 100 483 28700
SANJAK JampKPDD HYDRO-HYDRO 126 441 36000
SEWA-III JampKPDD HYDRO-HYDRO 900 3273 20200
BHADERWAH JampKPDD HYDRO-HYDRO 150 935 8900
BAZGO JampKPDD HYDRO-HYDRO 030 108 33300
SUMOOR JampKPDD HYDRO-HYDRO 010 045 35400
HUNDER JampKPDD HYDRO-HYDRO 040 176 26200
STAKNA JampKPDD HYDRO-HYDRO 400 1933 4100
KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 124000 662879 31360
SURATGARH TPS RRVUNL THERMAL-COAL 150000 402328 41730
CHHABRA TPS 1amp 2 RRVUNL THERMAL-COAL 50000 305946 36700
CHHABRA TPS 3 RRVUNL THERMAL-COAL 25000 151536 36700
CHHABRA TPS 4 RRVUNL THERMAL-COAL 25000 155896 36700
RAMGARH GT POWER PROJECT RRVUNL THERMAL-COAL 22050 43177 41800
RAMGARH GAS T P PROJECT 3 RRVUNL THERMAL-GAS 5000 93615 41800
DHOLPUR C C POWER PROJECT RRVUNL THERMAL-R-LNG 33000 9486 46110
MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 14000 20855 34192
MINI MICRO HYDEL (MMH) P S RRVUNL HYDRO-HYDRO 2385 851 37800
KALISINDH TPP 1 RRVUNL THERMAL-COAL 60000 341543 45000
KALISINDH TPP 2 RRVUNL THERMAL-COAL 60000 211588 45000
KHARA HEP UPJVNL HYDRO-HYDRO 7200 26654 7200
MATATILLA HEP UPJVNL HYDRO-HYDRO 3060 12219 6500
OBRA HEP UPJVNL HYDRO-HYDRO 9900 21517 6300
RIHAND UPJVNL HYDRO-HYDRO 30000 57369 5500
ANPARA A TPS UPRVUNL THERMAL-COAL 63000 317536 27000
ANPARA B TPS UPRVUNL THERMAL-COAL 100000 705605 22700
ANPARA D UPRVUNL THERMAL-COAL 100000 300158 39800
HARDUAGANJ TPS UPRVUNL THERMAL-COAL 16500 45817 49200
HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 50000 304389 46600
OBRA A TPS UPRVUNL THERMAL-COAL 28800 13158 34000
OBRA B TPS UPRVUNL THERMAL-COAL 100000 328124 21900
Page 34
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) PANKI TPS UPRVUNL THERMAL-COAL 21000 66488 50300
PARICHHA TPS UPRVUNL THERMAL-COAL 22000 38762 49400
PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 42000 231931 45600
PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 50000 276722 50400
CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 24000 70845 8290
CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 14400 75366 8390
DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 3375 9595 12080
DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 5100 18701 10520
KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4140 17359 12330
KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 12000 33001 9420
KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 3000 11953 8320
TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 9000 33983 12460
MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 30400 124510 16110
RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 19800 17897 10550
MPUR UTTARAKHAND JVNL HYDRO-HYDRO 930 5121 19200
PATHRI UTTARAKHAND JVNL HYDRO-HYDRO 2040 11636 14200
GALOGI UTTARAKHAND JVNL HYDRO-HYDRO 300 648 12500
PRIVATE SECTOR
MGTPP CLP INDIA PVT LTD THERMAL-COAL 132000 268902 41940
SHRINAGAR HEP ALAKNANDA HPCL HYDRO-HYDRO 33000 127414 48800
GAMA INFRAPROP CCPP GAMA INFRAPROP PVT THERMAL-GAS 22500 52686 47000
PPGCL (BARA) JP POWER VENTURES LTD THERMAL-COAL 198000 448200 38500
MALANA HEP MALANA PCL HYDRO-HYDRO 8600 26354 29792
MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 10000 30369 32580
ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 19200 56347 36079
KASHANG HEP H P PCL HYDRO-HYDRO 19500 5034 29200
BASPA-II HEP HBPCL HYDRO-HYDRO 30000 132769 13600
KARCHAM WANGTOO HEP HBPCL HYDRO-HYDRO 100000 434386 36600
RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 108000 582600 43700
RITHALA COMBI CY POWER PLANT TATA POWER DDL THERMAL-GAS 9480 000 11900
RAJPURA TPS NABHA POWER LTD THERMAL-GAS 140000 901484 39000
TALWANDI SABO POWER LTD TALWANDI SABO POWER LTD THERMAL-COAL 198000 636040 49548
ROJA THERMAL POWER STATION ROJA POWER SCL THERMAL-COAL 120000 727200 43400
KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 34400 63400
BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 36000 62600
MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 38200 60800
UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 37900 61500
KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 42300 58800
LALITPUR PGCL BAJAJ ENERGY PVT LTD THERMAL-COAL 198000 359400 47300
PRAYAGRAJ PGCL PRAYAGRAJ PGCL THERMAL-COAL 132000 448200 38595
KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 132000 783182 33438
WESTERN REGION
CENTRAL SECTOR
INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 100000 325333 23892
OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 52000 141663 34001
GANDHAR CCPP NTPC LTD THERMAL-GAS 65739 221924 28700
KAWAS CCPP NTPC LTD THERMAL-GASN 65620 167929 27000
KORBA I amp II NTPC LTD THERMAL-COAL 210000 1499171 20500
KORBA III NTPC LTD THERMAL-COAL 50000 358746 26600
SIPAT STPS I NTPC LTD THERMAL-COAL 198000 1479902 26800
SIPAT STPS II NTPC LTD THERMAL-COAL 100000 766549 26500
VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 126000 693142 25800
VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 100000 608781 23800
VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 100000 673475 27600
VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 100000 655924 32900
VINDHYACHAL STPS V NTPC LTD THERMAL-COAL 50000 328265 31700
MOUDA I NTPC LTD THERMAL-COAL 100000 343130 44500
MOUDA Ii NTPC LTD THERMAL-COAL 66000 40637 39900
RATNAGIRI GAS amp POWER PVT LTD RGPPL THERMAL-GAS 196708 442485 47000
KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 000 24729
TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 32000 201227 10740
Page 35
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 365122 19069
TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 787444 29324
STATE SECTOR
GSEG-HAZIRA15610 MW GUJARAT S ENEGEN LTD THERMAL-GAS 15610 1805 28200
GSEG-HAZIRA35143 MW GUJARAT S ENEGEN LTD THERMAL-GAS 35130 22276 51300
GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 21978 51800
AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 13929 26100
KORBA TPS EAST CSPGCL THERMAL-COAL 44000 198673 33880
DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 365808 27570
KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 316500 30420
HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 532878 19410
CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 515 58300
MTTPS CHAMPA U-I CSPGCL THERMAL-COAL 50000 220376 39000
MTTPS CHAMPA U-II CSPGCL THERMAL-COAL 50000 23709 10000
SHP GANGREL CSPGCL HYDRO-HYDRO 1000 2350 36790
BANGO HEP CSPGCL HYDRO-HYDRO 12000 14662 8900
MHP KORBA WEST CSPGCL HYDRO-HYDRO 170 859 38190
SIKASAR HEP CSPGCL HYDRO-HYDRO 700 418 26870
DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8843 74500
DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 19446 51500
GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 66388 71600
GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127488 41300
KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 96072 43900
KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 29841 56400
SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 184966 58800
UKAI 1-5 GSECL THERMAL-COAL 85000 204891 46900
UKAI TPS 6 GSECL THERMAL-COAL 50000 284448 48200
WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 271999 58300
WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 82808 44100
KADANA HPS GSECL HYDRO-HYDRO 24200 34433 16800
UKAI HPS GSECL HYDRO-HYDRO 30500 40585 6100
TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 123000 11500
BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 8900 10900
BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 7200 27500
JHINNA HPS MPPGCL HYDRO-HYDRO 2000 9700 18500
RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 44300 3400
GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 17300 4600
SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 4100 16900
MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 14600 27000
PENCH HPS MPPGCL HYDRO-HYDRO 16000 23700 8100
RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 3000 16900
AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 134400 35100
SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 283800 38700
SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 344600 34300
SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 111600 61600
SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 211800 58000
SSTPS PH-I MPPGCL THERMAL-COAL 120000 233100 84300
BHUSAWAL TPS MSPGCL THERMAL-COAL 142000 566258 51100
CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1365682 33700
KHAPERKHEDA MSPGCL THERMAL-COAL 134000 706207 39100
KORADI TPS MSPGCL THERMAL-COAL 62000 443206 42000
NASIK TPS MSPGCL THERMAL-COAL 63000 297275 47000
PARLI TPS MSPGCL THERMAL-COAL 113000 175934 71600
PARAS MSPGCL THERMAL-COAL 50000 267931 38700
URAN CCPP MSPGCL THERMAL-GAS 67200 320330 30600
KOYANA MSPGCL HYDRO-HYDRO 195600 328155 13100
SMALL HYDRO POWER PLANTS MSPGCL HYDRO-HYDRO 45400 93062 30500
BHIRA MSPGCL HYDRO-HYDRO 8000 10046 8400
TILLARI MSPGCL HYDRO-HYDRO 8900 10584 3100
SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 233298 20500
SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 87633 20500
PRIVATE SECTOR
Page 36
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 81282 46750
JNSTPP(JAYPEE NIGRIE) JP POWER VENTURES LTD THERMAL-COAL 132000 726695 29310
MB POWER MB POWER THERMAL-COAL 120000 345632 38310
ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 754922 28671
ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 780761 23495
ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 198000 1263784 32090
ADANI POWER MAHARA ADANI POWER LTD THERMAL-COAL 330000 1666191 34124
AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 170065 36827
SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 252035 45129
ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 458551 36000
ESSAR POWER MP LTD ESSAR POWER MP LTD THERMAL-COAL 60000 243040 28600
VEDANTA LTD (P P -I) VEDANTA LTD THERMAL-GAS 3000 15044 24000
VEDANTA LTD (P P -II) VEDANTA LTD THERMAL-GAS 3000 21293 24000
PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 8234600 24000
165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 5850 64390
145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 68717 40349
SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 132655 28776
SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 144686 38567
MUNDRA UMPPCOASTAL GUJARAT POWER
LTD THERMAL-IMP COAL 400000 2530300
23900
LANCO AMARKANTAK TPP PATHADIH
U-ILANCO AMARKAN POWER LTD THERMAL-COAL 30000 195500
29200
LANCO AMARKANTAK TPP PATHADIH
U-IILANCO AMARKAN POWER LTD THERMAL-COAL 30000 206900
27600
BARADARHA TPS D B POWER LTD THERMAL-COAL 120000 677373 29200
JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 405000 28900
JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 453000 40500
DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 339437 40700
TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 293400 44000
TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 137200 37000
TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 174900 44000
BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 92900 14100
BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23700 34300
KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 27600 48300
CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2530300 23900
BHANDARDRA HEP -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 2475 54900
SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 161400 26500
SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 445000 39000
SOTHERN REGION
CENTRAL SECTOR
NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 325699 54820
NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 305532 39880
NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 998805 38510
NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 113016 54070
NEYVELI TAMILNADU POWER LTD JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 625274 42200
VALLUR TPS NTPC TECL THERMAL-COAL 150000 856438 42350
R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 1493 84300
RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1502919 29400
RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 341291 31800
SIMHADRI I NTPC LTD THERMAL-COAL 100000 688382 36800
SIMHADRI II NTPC LTD THERMAL-COAL 100000 663657 43400
KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 593110 31324
MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 291625 21764
KKNPP-1 amp 2 NPCIL NUCLEAR-NUCLEAR 200000 572609 40948
MINICOY LAKSHADEEP THERMAL-DIESEL 340 770 29600
KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1097 29600
AMINI LAKSHADEEP THERMAL-DIESEL 265 509 29600
ANDROTT LAKSHADEEP THERMAL-DIESEL 219 524 29600
KALPENI LAKSHADEEP THERMAL-DIESEL 175 356 29600
AGATTI LAKSHADEEP THERMAL-DIESEL 195 658 29600
KADMAT LAKSHADEEP THERMAL-DIESEL 190 414 29600
KILTAN LAKSHADEEP THERMAL-DIESEL 150 269 29600
CHETLET LAKSHADEEP THERMAL-DIESEL 100 139 29600
BITRA LAKSHADEEP THERMAL-DIESEL 043 024 29600
BANGARAM LAKSHADEEP THERMAL-DIESEL 018 009 29600
Page 37
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) STATE SECTOR
Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 721811 46500
Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 50000 336142 46500
RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 237358 46500
RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 239926 46500
RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 124500 46500
SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 62109 46500
UPPER SILERU APGENCO HYDRO-HYDRO 24000 33000 46500
LOWER SILERU APGENCO HYDRO-HYDRO 46000 81066 46500
DONKARAI APGENCO HYDRO-HYDRO 2500 6007 46500
PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 1262 46500
CHETTIPETA APGENCO HYDRO-HYDRO 100 214 46500
MUCHKUND APGENCO HYDRO-HYDRO 12000 37571 46500
NAGARJUNASAGAR RCPH APGENCO HYDRO-HYDRO 9000 606 46500
TUNGABHADRA HES amp HAMPI(AP
Share)
APGENCO HYDRO-HYDRO 7200 6100 46500
KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 352232 42600
KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 288131 32500
KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 319272 46500
RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 40073 44300
KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 308317 46000
KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 308963 51300
SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 61004 76600
NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 17960 75300
PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 20873 58300
POCHAMPAD-I TSPGENCO HYDRO-HYDRO 2700 5455 29800
POCHAMPAD-II TSPGENCO HYDRO-HYDRO 900 1932 40700
NIZAMSAGAR TSPGENCO HYDRO-HYDRO 1000 1126 53400
RAICHUR TPS 1 to 7 KPCL THERMAL-COAL 147000 890866 43800
RAICHUR TPS 8 KPCL THERMAL-COAL 25000 159523 48200
BELLARI TPS 1 KPCL THERMAL-COAL 50000 318679 51100
BELLARI TPS 2 KPCL THERMAL-COAL 50000 232347 55600
BELLARI TPS 3 KPCL THERMAL-COAL 70000 47565 34400
BHADRA PH KPCL HYDRO-HYDRO 3920 2369 45900
GERUSUPPA PH KPCL HYDRO-HYDRO 24000 26990 22000
GHAT PRABHA HEP KPCL HYDRO-HYDRO 3200 4777 25300
KADRA HPS KPCL HYDRO-HYDRO 15000 16889 26800
NAGJHARI KPCL HYDRO-HYDRO 90000 155159 9800
KODASALLI DPH KPCL HYDRO-HYDRO 12000 14854 19200
MUNIRA+MGH+SPH+SPH KPCL HYDRO-HYDRO 22640 48211 7900
SHARAVATHY HPS KPCL HYDRO-HYDRO 108550 276215 5400
ALMATTI DPH KPCL HYDRO-HYDRO 29000 39611 24600
VARAHI UGPH KPCL HYDRO-HYDRO 46000 71368 15600
IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 17196 15300
IDUKKI HPS KSEB HYDRO-HYDRO 78000 137905 15300
KAKKAD HPS KSEB HYDRO-HYDRO 5000 13063 15300
KALLADA HPS KSEB HYDRO-HYDRO 1500 4436 15300
KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 46544 15300
KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 635 15300
LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 30822 15300
MALANKARA HPS KSEB HYDRO-HYDRO 1050 2474 15300
MATTUPETTY KSEB HYDRO-HYDRO 200 230 15300
MALAMPUZHA KSEB HYDRO-HYDRO 250 063 15300
CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 864 15300
URUMI ST I amp II KSEB HYDRO-HYDRO 615 903 15300
LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 248 15300
NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7765 19625 15300
PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 16601 15300
PANNIAR HPS KSEB HYDRO-HYDRO 3240 6217 15300
PORINGALKUTHU KSEB HYDRO-HYDRO 3600 10052 15300
PORINGALKUTHU LBE KSEB HYDRO-HYDRO 1600 9438 15300
PEPPARA KSEB HYDRO-HYDRO 300 395 15300
POOZHITHODE KSEB HYDRO-HYDRO 480 1045 15300
Page 38
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) PEECHI KSEB HYDRO-HYDRO 125 040 15300
RANI-PERUNADU KSEB HYDRO-HYDRO 400 585 15300
SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 79783 15300
SENGULAM HPS KSEB HYDRO-HYDRO 5120 11558 15300
SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 16711 15300
VILANGAD KSEB HYDRO-HYDRO 750 1578 15300
BARAPOLE KSEB HYDRO-HYDRO 1500 1932 15300
VELLATHOOVAL KSEB HYDRO-HYDRO 360 305 15300
CHIM0NY KSEB HYDRO-HYDRO 250 156 15300
ADYANPARA KSEB HYDRO-HYDRO 350 501 15300
BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 554 15300
KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 3801 15300
KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 23132 32800
ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 14416 62280
METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 523970 62280
METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 321270 62280
NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 336575 62280
NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 591240 62280
TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 508966 62280
KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 30897 62280
VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 18720 90699 62280
KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 33593 62280
BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 1047 62280
PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 1250 62280
PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 330 62280
MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 4897 62280
MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 032 62280
KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15681 62280
KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 40608 62280
KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 21342 62280
KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 4717 62280
KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4322 62280
KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2399 62280
METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 4416 62280
METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 8035 62280
BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2187 62280
BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2359 62280
BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2511 62280
BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 1949 62280
BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 1819 62280
POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 172 62280
SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 241 62280
MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 026 62280
THIRUMOORTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 136 62280
PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 9309 62280
VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 353 62280
SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 4192 62280
PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 6571 62280
SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 1186 62280
SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6319 62280
ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 6122 62280
KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 28674 62280
SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 18381 62280
SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 4258 62280
KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 12680 62280
KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4201 62280
ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 000 62280
PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 19175 62280
AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 078 62280
BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 504 62280
BHAVANI KATTALAI (BKB)(IIIampIII BB I amp II)TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 5847 62280
PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 000 62280
Page 39
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) SRI DAMODARAM STPS APPDCL THERMAL-COAL 160000 808108 36300
PRIVATE SECTOR
KARUPPUR TANJORE LANCO TANJORE PCL THERMAL-GAS 12000 48096 28770
SIMHAPURI ENERGY LTD SIMHAPURI ENERGY LTD THERMAL-COAL 60000 143900 39100
JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 7111 45500
SBU 1 JSW ENERGY LTD
VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 26000 159100
43300
SBU 2 JSW ENERGY LTD
VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 60000 247900
42800
LANCO KPLLANCO KONDAPALLI POWER
LTDTHERMAL-GAS 36814 85060
25776
LANCO KPL STG -IILANCO KONDAPALLI POWER
LTDTHERMAL-GAS 36600 12979
46330
LANCO KPL STG -IIIALANCO KONDAPALLI POWER
LTDTHERMAL-GAS 37100 85710
46330
LANCO KPL STG -III BLANCO KONDAPALLI POWER
LTDTHERMAL-GAS 37100 43639
46330
HINDUJA NATIONAL PCL HINDUJA NATIONAL PCL THERMAL-COAL 104000 303000 38200
MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 121164 49940
UDUPI POWER COR LTD ADANI POWER LTD THERMAL-COAL 120000 754613 42500
SPECTRUM POWER GENERATION
LTD SPECTRUM PG LTD THERMAL-GASN 20525 9256812
34952
TAQA NEYVELI POWER COM PVT
LTD TAQA NEYVELI THERMAL-LIG 25000 5840
34500
ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 251000 51000
ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 207860 36800
GMR VEMAGIRI POWER GENERATION
LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 30117
46450
EASTERN REGION
CENTRAL SECTOR
MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 64675 53113
MTPS STAGE - II KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 39000 1432 69138
BOKARO `B` TPS DVC THERMAL-COAL 63000 145670 31539
MEJIA TPS U 1-3 DVC THERMAL-COAL 63000 348298 31552
MEJIA TPS U 4 DVC THERMAL-COAL 21000 116099 34997
MEJIA TPS U 5-6 DVC THERMAL-COAL 50000 276427 35976
MEJIA TPS U 7-8 DVC THERMAL-COAL 100000 552854 36991
DURGAPUR STEEL TPS DVC THERMAL-COAL 100000 665550 39323
DURGAPUR TPS DVC THERMAL-COAL 21000 59270 35416
RAGHUNATHPUR TPS DVC THERMAL-COAL 120000 201650 35326
MAITHON HYDEL STA DVC HYDRO-HYDRO 6320 12200 17984
CHANDRAPURA TPSU1-3 DVC THERMAL-COAL 42000 257610 35095
CHANDRAPURA TPSU7-8 DVC THERMAL-COAL 50000 306673 34987
KODERMA TPS DVC THERMAL-COAL 100000 380180 38131
PANCHET HPS DVC HYDRO-HYDRO 8000 13360 17984
TILLAYA HPS DVC HYDRO-HYDRO 400 1410 17984
RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34700 35400
TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 277300 23200
TLDP -III NHPC LTD HYDRO-HYDRO 13200 55400 62000
TLDP -IV NHPC LTD HYDRO-HYDRO 16000 60300 25600
FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 957219 33700
FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 308943 41000
BONGAINGAON TPS NTPC LTD THERMAL-COAL 25000 153663 58600
KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 542277 34200
KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 942591 34200
BARH-II NTPC LTD THERMAL-COAL 132000 728021 44500
TALCHER TPS NTPC LTD THERMAL-COAL 46000 335521 30100
TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 702319 25600
TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1436521 24700
STATE SECTOR
BTPS(RampM) BIHAR STATE PGCL THERMAL-COAL 22000 12142 39700
BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 98331 10602
HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 50593 9482
CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 19689 2605
RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 53192 6033
UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 147208 14637
Page 40
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 60353 4519
IB TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 288567 25000
J P H GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 210 038 61100
MEYONG CHU GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 400 1086 61100
TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 122667 38200
DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 214339 43321
KOLAGHAT THERMAL POWER
STATION
WEST BENGAL PDCL THERMAL-COAL 126000 538269 31603
BAKRESHWAR THERMAL POWER
PLANT
WEST BENGAL PDCL THERMAL-COAL 105000 634876 32154
BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 45000 166855 33299
SANTHALDIH THERMAL POWER
STATION
WEST BENGAL PDCL THERMAL-COAL 50000 336442 34932
SAGARDIGHI THERMAL POWER
PROJECT
WEST BENGAL PDCL THERMAL-COAL 160000 423121 34705
JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 20344 68900
RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 24559 68900
TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 4623 68900
PURULIA PUMPED STORAGE
PROJECT
WEST BENGAL SEDCL HYDRO-HYDRO 90000 108816 68900
MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2768 68900
PRIVATE SECTOR
CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 49474 20230
CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 555500 70200
HALDIA ENERGY HALDIA ENERGY LTD THERMAL-COAL 60000 371000 50400
DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3688 63400
KAMALANGA TPS GMR KAMALANGA ENERGY LTD THERMAL-COAL 105000547670
33300
ADHUNIK POWER U-1 ADHUNIK POWER THERMAL-COAL 27000 158 44060
ADHUNIK POWER U-2 ADHUNIK POWER THERMAL-COAL 27000 168 44250
VL-JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 332800 23622
JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 43000 45250
JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 71700 37030
JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 70700 35920
JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 71100 38870
JOJOBERA UNIT 5 TATA POWER COM LTD THERMAL-COAL 12000 79300 44560
JOJOBERA UNIT 6 TATA POWER COM LTD THERMAL-WHR 12000 83700 12840
IEL KALINGANAGAR U-I TATA POWER COM LTD THERMAL-WG 6750 33400 22500
IEL KALINGANAGAR U-II TATA POWER COM LTD THERMAL-WG 6750 34800 22500
MAITHON UNIT 1 amp 2 TATA POWER COM LTD THERMAL-COAL 105000 678000 36100
HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 27500 24340
HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 28400 24340
HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 15800 24310
NORTH EASTERN REGION
CENTRAL SECTOR
LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 74100 36600
AGARTALA GT NEEPCO THERMAL-GAS 13500 88611 27210
ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 153111 32310
DOYANG HEP NEEPCO HYDRO-HYDRO 7500 25598 49801
KOPILI HEP NEEPCO HYDRO-HYDRO 20000 98186 11491
KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 19582 20237
KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 10310 17968
RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 124093 22945
TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 10100 17344 39000
STATE SECTOR
HYDRO POWER (122 Stns) ITANAGAR GOVT OF ARUNACHAL
PRADESHHYDRO-HYDRO 6971 6217270
24600
KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39514 17337
LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 82327 36810
NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 33318 48290
MYNTRIANG SHEP ST II ASSAM POWER GENCO HYDRO-HYDRO 300 567 35776
LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 9130 49200
LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 012 49200
DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 022 49200
TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 000 49200
UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 4990 16000
UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 6476 37000
UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 16494 14600
UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 3600 9556 15000
SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 758 8000
MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44070 44800
KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 154 41400
TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 091 41400
MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 411 41400
MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 394 41400
KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 760 41400
SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 3264 41400
LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 044 41400
BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 18953 28000
ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 43585 28200
GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 4080 11100
Note
LIG Lignite N Naptha WHR Waste Heat Recovery
Page 41
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) NORTHERN REGION
CENTRAL SECTOR
BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 18000 66900 19800
CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 54000 222400 21600
CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 30000 144400 19600
CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 23100 91700 42600
PARBATI - III HPS NHPC LTD HYDRO-HYDRO 52000 68200 54800
DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 28000 95600 30000
CHUTAK NHPC LTD HYDRO-HYDRO 4400 22000 79800
DULHASTI HPS NHPC LTD HYDRO-HYDRO 39000 228000 56400
SALAL HPS NHPC LTD HYDRO-HYDRO 69000 342300 11000
TANAKPUR HPS NHPC LTD HYDRO-HYDRO 9420 43000 29600
URI HPS -I NHPC LTD HYDRO-HYDRO 48000 280300 16000
URI HPS - II NHPC LTD HYDRO-HYDRO 24000 147300 48600
NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 4500 24600 88200
SEWA - II NHPC LTD HYDRO-HYDRO 12000 47100 43400
ANTA CCPP NTPC LTD THERMAL-GASN 41930 67539 32400
AURAIYA CCPP NTPC LTD THERMAL-GASN 66336 53501 39100
BADARPUR TPS NTPC LTD THERMAL-COAL 70500 159153 44800
DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 84000 296170 42300
DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 98000 526686 46300
DADRI CCPP NTPC LTD THERMAL-GASHSD 82978 227469 33000
FARIDABAD CCPP NTPC LTD THERMAL-GASN 43159 115577 30800
RIHAND STPS I NTPC LTD THERMAL-COAL 100000 596766 24500
RIHAND STPS II NTPC LTD THERMAL-COAL 100000 737069 24600
RIHAND STPS III NTPC LTD THERMAL-COAL 100000 706546 30600
SINGRAULI STPS NTPC LTD THERMAL-COAL 200000 1394068 20400
TANDA TPS NTPC LTD THERMAL-COAL 44000 295438 40800
UNCHAHAR TPS I NTPC LTD THERMAL-COAL 42000 256454 39800
UNCHAHAR TPS II NTPC LTD THERMAL-COAL 42000 273577 38900
UNCHAHAR TPS III NTPC LTD THERMAL-COAL 21000 142780 43000
KOLDAM NTPC LTD HYDRO-HYDRO 80000 363260 43600
NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 303575 25841
RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 108000 668677 35374
NJHPS SJVNL HYDRO-HYDRO 150000 699496 23820
RAMPUR HPS SJVNL HYDRO-HYDRO 41202 195982 32260
TEHRI HPP THDC HYDRO-HYDRO 100000 272543 51800
KOTESHWAR HEP THDC HYDRO-HYDRO 40000 106244 53400
IGSTPS JHAJJAR ARAVALI P CPL THERMAL-COAL 150000 510429 49490
NEYVELI BARSINGSAR NEYVELI LIG CORP LTD THERMAL-LIG 25000 127520 38040
STATE SECTOR
PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 21000 14222 48200
PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 21000 19205 48400
PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 25000 102257 42600
PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 25000 62107 41800
DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 60000 312213 41000
RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 120000 35767442200
WYC HYDEL STATION HPGCL HYDRO-HYDRO 6240 20365 24900
GIRI POWER HOUSE HPSEB HYDRO-HYDRO 6000 13958 7600
ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 1695 5467 11900
BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 12000 18528 6700
GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 2250 7462 22500
BASSI POWER HOUSE HPSEB HYDRO-HYDRO 6600 29649 7500
BINWA POWER HOUSE HPSEB HYDRO-HYDRO 600 2749 19300
ANNEXURE-I
RATE OF SALE OF POWER FOR THE YEAR 2016-2017
Page 33
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) GAJ POWER HOUSE HPSEB HYDRO-HYDRO 1050 2914 26700
BANER POWER HOUSE HPSEB HYDRO-HYDRO 1200 2864 16200
HOLI POWER HOUSE HPSEB HYDRO-HYDRO 300 616 22500
THIROT POWER HOUSE HPSEB HYDRO-HYDRO 450 1126 22500
KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 1200 3064 22500
LARJI POWER HOUSE HPSEB HYDRO-HYDRO 12600 53677 23700
NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 250 750 31000
CHABA POWER HOUSE HPSEB HYDRO-HYDRO 175 465 23300
RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 150 101 13400
SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 200 000 22500
KILLAR HPSEB HYDRO-HYDRO 030 050 22500
BHABA AUGUMENP H HPSEB HYDRO-HYDRO 450 1276 22500
BS CHAMBA HPSEB HYDRO-HYDRO 045 099 19500
GUMMA HPSEB HYDRO-HYDRO 300 423 22500
GAS TURBINE POWER STATION IPGCL THERMAL-GAS 27000 67233 39300
PPS-I PPCL THERMAL-GAS 33000 175905 38300
PPS-III PPCL THERMAL-GAS 137120 196879 36100
LOWER JHELUM JampKPDD HYDRO-HYDRO 10500 60214 5100
UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 2260 10514 6300
UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 10500 44202 8500
GANDHARBAL JampKPDD HYDRO-HYDRO 1500 8925 4700
KARNAH MPH JampKPDD HYDRO-HYDRO 200 1122 31000
CHENANI I JampKPDD HYDRO-HYDRO 2330 10892 6600
CHENANI II JampKPDD HYDRO-HYDRO 200 1188 9300
CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 750 3634 14200
IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 375 2108 18500
IGO MERCHELLONG JampKPDD HYDRO-HYDRO 300 1572 29700
PAHALGAM MHP JampKPDD HYDRO-HYDRO 450 1713 32900
MARPACHOO JampKPDD HYDRO-HYDRO 075 375 29800
HAFTAL JampKPDD HYDRO-HYDRO 100 483 28700
SANJAK JampKPDD HYDRO-HYDRO 126 441 36000
SEWA-III JampKPDD HYDRO-HYDRO 900 3273 20200
BHADERWAH JampKPDD HYDRO-HYDRO 150 935 8900
BAZGO JampKPDD HYDRO-HYDRO 030 108 33300
SUMOOR JampKPDD HYDRO-HYDRO 010 045 35400
HUNDER JampKPDD HYDRO-HYDRO 040 176 26200
STAKNA JampKPDD HYDRO-HYDRO 400 1933 4100
KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 124000 662879 31360
SURATGARH TPS RRVUNL THERMAL-COAL 150000 402328 41730
CHHABRA TPS 1amp 2 RRVUNL THERMAL-COAL 50000 305946 36700
CHHABRA TPS 3 RRVUNL THERMAL-COAL 25000 151536 36700
CHHABRA TPS 4 RRVUNL THERMAL-COAL 25000 155896 36700
RAMGARH GT POWER PROJECT RRVUNL THERMAL-COAL 22050 43177 41800
RAMGARH GAS T P PROJECT 3 RRVUNL THERMAL-GAS 5000 93615 41800
DHOLPUR C C POWER PROJECT RRVUNL THERMAL-R-LNG 33000 9486 46110
MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 14000 20855 34192
MINI MICRO HYDEL (MMH) P S RRVUNL HYDRO-HYDRO 2385 851 37800
KALISINDH TPP 1 RRVUNL THERMAL-COAL 60000 341543 45000
KALISINDH TPP 2 RRVUNL THERMAL-COAL 60000 211588 45000
KHARA HEP UPJVNL HYDRO-HYDRO 7200 26654 7200
MATATILLA HEP UPJVNL HYDRO-HYDRO 3060 12219 6500
OBRA HEP UPJVNL HYDRO-HYDRO 9900 21517 6300
RIHAND UPJVNL HYDRO-HYDRO 30000 57369 5500
ANPARA A TPS UPRVUNL THERMAL-COAL 63000 317536 27000
ANPARA B TPS UPRVUNL THERMAL-COAL 100000 705605 22700
ANPARA D UPRVUNL THERMAL-COAL 100000 300158 39800
HARDUAGANJ TPS UPRVUNL THERMAL-COAL 16500 45817 49200
HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 50000 304389 46600
OBRA A TPS UPRVUNL THERMAL-COAL 28800 13158 34000
OBRA B TPS UPRVUNL THERMAL-COAL 100000 328124 21900
Page 34
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) PANKI TPS UPRVUNL THERMAL-COAL 21000 66488 50300
PARICHHA TPS UPRVUNL THERMAL-COAL 22000 38762 49400
PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 42000 231931 45600
PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 50000 276722 50400
CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 24000 70845 8290
CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 14400 75366 8390
DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 3375 9595 12080
DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 5100 18701 10520
KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4140 17359 12330
KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 12000 33001 9420
KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 3000 11953 8320
TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 9000 33983 12460
MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 30400 124510 16110
RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 19800 17897 10550
MPUR UTTARAKHAND JVNL HYDRO-HYDRO 930 5121 19200
PATHRI UTTARAKHAND JVNL HYDRO-HYDRO 2040 11636 14200
GALOGI UTTARAKHAND JVNL HYDRO-HYDRO 300 648 12500
PRIVATE SECTOR
MGTPP CLP INDIA PVT LTD THERMAL-COAL 132000 268902 41940
SHRINAGAR HEP ALAKNANDA HPCL HYDRO-HYDRO 33000 127414 48800
GAMA INFRAPROP CCPP GAMA INFRAPROP PVT THERMAL-GAS 22500 52686 47000
PPGCL (BARA) JP POWER VENTURES LTD THERMAL-COAL 198000 448200 38500
MALANA HEP MALANA PCL HYDRO-HYDRO 8600 26354 29792
MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 10000 30369 32580
ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 19200 56347 36079
KASHANG HEP H P PCL HYDRO-HYDRO 19500 5034 29200
BASPA-II HEP HBPCL HYDRO-HYDRO 30000 132769 13600
KARCHAM WANGTOO HEP HBPCL HYDRO-HYDRO 100000 434386 36600
RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 108000 582600 43700
RITHALA COMBI CY POWER PLANT TATA POWER DDL THERMAL-GAS 9480 000 11900
RAJPURA TPS NABHA POWER LTD THERMAL-GAS 140000 901484 39000
TALWANDI SABO POWER LTD TALWANDI SABO POWER LTD THERMAL-COAL 198000 636040 49548
ROJA THERMAL POWER STATION ROJA POWER SCL THERMAL-COAL 120000 727200 43400
KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 34400 63400
BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 36000 62600
MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 38200 60800
UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 37900 61500
KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 42300 58800
LALITPUR PGCL BAJAJ ENERGY PVT LTD THERMAL-COAL 198000 359400 47300
PRAYAGRAJ PGCL PRAYAGRAJ PGCL THERMAL-COAL 132000 448200 38595
KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 132000 783182 33438
WESTERN REGION
CENTRAL SECTOR
INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 100000 325333 23892
OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 52000 141663 34001
GANDHAR CCPP NTPC LTD THERMAL-GAS 65739 221924 28700
KAWAS CCPP NTPC LTD THERMAL-GASN 65620 167929 27000
KORBA I amp II NTPC LTD THERMAL-COAL 210000 1499171 20500
KORBA III NTPC LTD THERMAL-COAL 50000 358746 26600
SIPAT STPS I NTPC LTD THERMAL-COAL 198000 1479902 26800
SIPAT STPS II NTPC LTD THERMAL-COAL 100000 766549 26500
VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 126000 693142 25800
VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 100000 608781 23800
VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 100000 673475 27600
VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 100000 655924 32900
VINDHYACHAL STPS V NTPC LTD THERMAL-COAL 50000 328265 31700
MOUDA I NTPC LTD THERMAL-COAL 100000 343130 44500
MOUDA Ii NTPC LTD THERMAL-COAL 66000 40637 39900
RATNAGIRI GAS amp POWER PVT LTD RGPPL THERMAL-GAS 196708 442485 47000
KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 000 24729
TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 32000 201227 10740
Page 35
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 365122 19069
TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 787444 29324
STATE SECTOR
GSEG-HAZIRA15610 MW GUJARAT S ENEGEN LTD THERMAL-GAS 15610 1805 28200
GSEG-HAZIRA35143 MW GUJARAT S ENEGEN LTD THERMAL-GAS 35130 22276 51300
GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 21978 51800
AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 13929 26100
KORBA TPS EAST CSPGCL THERMAL-COAL 44000 198673 33880
DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 365808 27570
KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 316500 30420
HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 532878 19410
CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 515 58300
MTTPS CHAMPA U-I CSPGCL THERMAL-COAL 50000 220376 39000
MTTPS CHAMPA U-II CSPGCL THERMAL-COAL 50000 23709 10000
SHP GANGREL CSPGCL HYDRO-HYDRO 1000 2350 36790
BANGO HEP CSPGCL HYDRO-HYDRO 12000 14662 8900
MHP KORBA WEST CSPGCL HYDRO-HYDRO 170 859 38190
SIKASAR HEP CSPGCL HYDRO-HYDRO 700 418 26870
DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8843 74500
DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 19446 51500
GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 66388 71600
GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127488 41300
KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 96072 43900
KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 29841 56400
SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 184966 58800
UKAI 1-5 GSECL THERMAL-COAL 85000 204891 46900
UKAI TPS 6 GSECL THERMAL-COAL 50000 284448 48200
WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 271999 58300
WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 82808 44100
KADANA HPS GSECL HYDRO-HYDRO 24200 34433 16800
UKAI HPS GSECL HYDRO-HYDRO 30500 40585 6100
TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 123000 11500
BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 8900 10900
BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 7200 27500
JHINNA HPS MPPGCL HYDRO-HYDRO 2000 9700 18500
RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 44300 3400
GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 17300 4600
SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 4100 16900
MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 14600 27000
PENCH HPS MPPGCL HYDRO-HYDRO 16000 23700 8100
RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 3000 16900
AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 134400 35100
SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 283800 38700
SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 344600 34300
SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 111600 61600
SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 211800 58000
SSTPS PH-I MPPGCL THERMAL-COAL 120000 233100 84300
BHUSAWAL TPS MSPGCL THERMAL-COAL 142000 566258 51100
CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1365682 33700
KHAPERKHEDA MSPGCL THERMAL-COAL 134000 706207 39100
KORADI TPS MSPGCL THERMAL-COAL 62000 443206 42000
NASIK TPS MSPGCL THERMAL-COAL 63000 297275 47000
PARLI TPS MSPGCL THERMAL-COAL 113000 175934 71600
PARAS MSPGCL THERMAL-COAL 50000 267931 38700
URAN CCPP MSPGCL THERMAL-GAS 67200 320330 30600
KOYANA MSPGCL HYDRO-HYDRO 195600 328155 13100
SMALL HYDRO POWER PLANTS MSPGCL HYDRO-HYDRO 45400 93062 30500
BHIRA MSPGCL HYDRO-HYDRO 8000 10046 8400
TILLARI MSPGCL HYDRO-HYDRO 8900 10584 3100
SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 233298 20500
SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 87633 20500
PRIVATE SECTOR
Page 36
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 81282 46750
JNSTPP(JAYPEE NIGRIE) JP POWER VENTURES LTD THERMAL-COAL 132000 726695 29310
MB POWER MB POWER THERMAL-COAL 120000 345632 38310
ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 754922 28671
ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 780761 23495
ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 198000 1263784 32090
ADANI POWER MAHARA ADANI POWER LTD THERMAL-COAL 330000 1666191 34124
AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 170065 36827
SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 252035 45129
ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 458551 36000
ESSAR POWER MP LTD ESSAR POWER MP LTD THERMAL-COAL 60000 243040 28600
VEDANTA LTD (P P -I) VEDANTA LTD THERMAL-GAS 3000 15044 24000
VEDANTA LTD (P P -II) VEDANTA LTD THERMAL-GAS 3000 21293 24000
PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 8234600 24000
165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 5850 64390
145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 68717 40349
SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 132655 28776
SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 144686 38567
MUNDRA UMPPCOASTAL GUJARAT POWER
LTD THERMAL-IMP COAL 400000 2530300
23900
LANCO AMARKANTAK TPP PATHADIH
U-ILANCO AMARKAN POWER LTD THERMAL-COAL 30000 195500
29200
LANCO AMARKANTAK TPP PATHADIH
U-IILANCO AMARKAN POWER LTD THERMAL-COAL 30000 206900
27600
BARADARHA TPS D B POWER LTD THERMAL-COAL 120000 677373 29200
JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 405000 28900
JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 453000 40500
DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 339437 40700
TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 293400 44000
TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 137200 37000
TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 174900 44000
BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 92900 14100
BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23700 34300
KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 27600 48300
CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2530300 23900
BHANDARDRA HEP -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 2475 54900
SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 161400 26500
SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 445000 39000
SOTHERN REGION
CENTRAL SECTOR
NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 325699 54820
NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 305532 39880
NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 998805 38510
NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 113016 54070
NEYVELI TAMILNADU POWER LTD JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 625274 42200
VALLUR TPS NTPC TECL THERMAL-COAL 150000 856438 42350
R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 1493 84300
RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1502919 29400
RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 341291 31800
SIMHADRI I NTPC LTD THERMAL-COAL 100000 688382 36800
SIMHADRI II NTPC LTD THERMAL-COAL 100000 663657 43400
KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 593110 31324
MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 291625 21764
KKNPP-1 amp 2 NPCIL NUCLEAR-NUCLEAR 200000 572609 40948
MINICOY LAKSHADEEP THERMAL-DIESEL 340 770 29600
KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1097 29600
AMINI LAKSHADEEP THERMAL-DIESEL 265 509 29600
ANDROTT LAKSHADEEP THERMAL-DIESEL 219 524 29600
KALPENI LAKSHADEEP THERMAL-DIESEL 175 356 29600
AGATTI LAKSHADEEP THERMAL-DIESEL 195 658 29600
KADMAT LAKSHADEEP THERMAL-DIESEL 190 414 29600
KILTAN LAKSHADEEP THERMAL-DIESEL 150 269 29600
CHETLET LAKSHADEEP THERMAL-DIESEL 100 139 29600
BITRA LAKSHADEEP THERMAL-DIESEL 043 024 29600
BANGARAM LAKSHADEEP THERMAL-DIESEL 018 009 29600
Page 37
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) STATE SECTOR
Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 721811 46500
Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 50000 336142 46500
RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 237358 46500
RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 239926 46500
RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 124500 46500
SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 62109 46500
UPPER SILERU APGENCO HYDRO-HYDRO 24000 33000 46500
LOWER SILERU APGENCO HYDRO-HYDRO 46000 81066 46500
DONKARAI APGENCO HYDRO-HYDRO 2500 6007 46500
PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 1262 46500
CHETTIPETA APGENCO HYDRO-HYDRO 100 214 46500
MUCHKUND APGENCO HYDRO-HYDRO 12000 37571 46500
NAGARJUNASAGAR RCPH APGENCO HYDRO-HYDRO 9000 606 46500
TUNGABHADRA HES amp HAMPI(AP
Share)
APGENCO HYDRO-HYDRO 7200 6100 46500
KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 352232 42600
KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 288131 32500
KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 319272 46500
RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 40073 44300
KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 308317 46000
KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 308963 51300
SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 61004 76600
NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 17960 75300
PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 20873 58300
POCHAMPAD-I TSPGENCO HYDRO-HYDRO 2700 5455 29800
POCHAMPAD-II TSPGENCO HYDRO-HYDRO 900 1932 40700
NIZAMSAGAR TSPGENCO HYDRO-HYDRO 1000 1126 53400
RAICHUR TPS 1 to 7 KPCL THERMAL-COAL 147000 890866 43800
RAICHUR TPS 8 KPCL THERMAL-COAL 25000 159523 48200
BELLARI TPS 1 KPCL THERMAL-COAL 50000 318679 51100
BELLARI TPS 2 KPCL THERMAL-COAL 50000 232347 55600
BELLARI TPS 3 KPCL THERMAL-COAL 70000 47565 34400
BHADRA PH KPCL HYDRO-HYDRO 3920 2369 45900
GERUSUPPA PH KPCL HYDRO-HYDRO 24000 26990 22000
GHAT PRABHA HEP KPCL HYDRO-HYDRO 3200 4777 25300
KADRA HPS KPCL HYDRO-HYDRO 15000 16889 26800
NAGJHARI KPCL HYDRO-HYDRO 90000 155159 9800
KODASALLI DPH KPCL HYDRO-HYDRO 12000 14854 19200
MUNIRA+MGH+SPH+SPH KPCL HYDRO-HYDRO 22640 48211 7900
SHARAVATHY HPS KPCL HYDRO-HYDRO 108550 276215 5400
ALMATTI DPH KPCL HYDRO-HYDRO 29000 39611 24600
VARAHI UGPH KPCL HYDRO-HYDRO 46000 71368 15600
IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 17196 15300
IDUKKI HPS KSEB HYDRO-HYDRO 78000 137905 15300
KAKKAD HPS KSEB HYDRO-HYDRO 5000 13063 15300
KALLADA HPS KSEB HYDRO-HYDRO 1500 4436 15300
KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 46544 15300
KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 635 15300
LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 30822 15300
MALANKARA HPS KSEB HYDRO-HYDRO 1050 2474 15300
MATTUPETTY KSEB HYDRO-HYDRO 200 230 15300
MALAMPUZHA KSEB HYDRO-HYDRO 250 063 15300
CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 864 15300
URUMI ST I amp II KSEB HYDRO-HYDRO 615 903 15300
LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 248 15300
NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7765 19625 15300
PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 16601 15300
PANNIAR HPS KSEB HYDRO-HYDRO 3240 6217 15300
PORINGALKUTHU KSEB HYDRO-HYDRO 3600 10052 15300
PORINGALKUTHU LBE KSEB HYDRO-HYDRO 1600 9438 15300
PEPPARA KSEB HYDRO-HYDRO 300 395 15300
POOZHITHODE KSEB HYDRO-HYDRO 480 1045 15300
Page 38
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) PEECHI KSEB HYDRO-HYDRO 125 040 15300
RANI-PERUNADU KSEB HYDRO-HYDRO 400 585 15300
SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 79783 15300
SENGULAM HPS KSEB HYDRO-HYDRO 5120 11558 15300
SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 16711 15300
VILANGAD KSEB HYDRO-HYDRO 750 1578 15300
BARAPOLE KSEB HYDRO-HYDRO 1500 1932 15300
VELLATHOOVAL KSEB HYDRO-HYDRO 360 305 15300
CHIM0NY KSEB HYDRO-HYDRO 250 156 15300
ADYANPARA KSEB HYDRO-HYDRO 350 501 15300
BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 554 15300
KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 3801 15300
KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 23132 32800
ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 14416 62280
METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 523970 62280
METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 321270 62280
NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 336575 62280
NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 591240 62280
TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 508966 62280
KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 30897 62280
VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 18720 90699 62280
KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 33593 62280
BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 1047 62280
PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 1250 62280
PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 330 62280
MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 4897 62280
MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 032 62280
KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15681 62280
KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 40608 62280
KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 21342 62280
KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 4717 62280
KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4322 62280
KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2399 62280
METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 4416 62280
METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 8035 62280
BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2187 62280
BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2359 62280
BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2511 62280
BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 1949 62280
BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 1819 62280
POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 172 62280
SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 241 62280
MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 026 62280
THIRUMOORTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 136 62280
PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 9309 62280
VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 353 62280
SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 4192 62280
PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 6571 62280
SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 1186 62280
SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6319 62280
ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 6122 62280
KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 28674 62280
SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 18381 62280
SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 4258 62280
KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 12680 62280
KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4201 62280
ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 000 62280
PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 19175 62280
AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 078 62280
BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 504 62280
BHAVANI KATTALAI (BKB)(IIIampIII BB I amp II)TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 5847 62280
PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 000 62280
Page 39
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) SRI DAMODARAM STPS APPDCL THERMAL-COAL 160000 808108 36300
PRIVATE SECTOR
KARUPPUR TANJORE LANCO TANJORE PCL THERMAL-GAS 12000 48096 28770
SIMHAPURI ENERGY LTD SIMHAPURI ENERGY LTD THERMAL-COAL 60000 143900 39100
JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 7111 45500
SBU 1 JSW ENERGY LTD
VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 26000 159100
43300
SBU 2 JSW ENERGY LTD
VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 60000 247900
42800
LANCO KPLLANCO KONDAPALLI POWER
LTDTHERMAL-GAS 36814 85060
25776
LANCO KPL STG -IILANCO KONDAPALLI POWER
LTDTHERMAL-GAS 36600 12979
46330
LANCO KPL STG -IIIALANCO KONDAPALLI POWER
LTDTHERMAL-GAS 37100 85710
46330
LANCO KPL STG -III BLANCO KONDAPALLI POWER
LTDTHERMAL-GAS 37100 43639
46330
HINDUJA NATIONAL PCL HINDUJA NATIONAL PCL THERMAL-COAL 104000 303000 38200
MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 121164 49940
UDUPI POWER COR LTD ADANI POWER LTD THERMAL-COAL 120000 754613 42500
SPECTRUM POWER GENERATION
LTD SPECTRUM PG LTD THERMAL-GASN 20525 9256812
34952
TAQA NEYVELI POWER COM PVT
LTD TAQA NEYVELI THERMAL-LIG 25000 5840
34500
ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 251000 51000
ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 207860 36800
GMR VEMAGIRI POWER GENERATION
LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 30117
46450
EASTERN REGION
CENTRAL SECTOR
MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 64675 53113
MTPS STAGE - II KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 39000 1432 69138
BOKARO `B` TPS DVC THERMAL-COAL 63000 145670 31539
MEJIA TPS U 1-3 DVC THERMAL-COAL 63000 348298 31552
MEJIA TPS U 4 DVC THERMAL-COAL 21000 116099 34997
MEJIA TPS U 5-6 DVC THERMAL-COAL 50000 276427 35976
MEJIA TPS U 7-8 DVC THERMAL-COAL 100000 552854 36991
DURGAPUR STEEL TPS DVC THERMAL-COAL 100000 665550 39323
DURGAPUR TPS DVC THERMAL-COAL 21000 59270 35416
RAGHUNATHPUR TPS DVC THERMAL-COAL 120000 201650 35326
MAITHON HYDEL STA DVC HYDRO-HYDRO 6320 12200 17984
CHANDRAPURA TPSU1-3 DVC THERMAL-COAL 42000 257610 35095
CHANDRAPURA TPSU7-8 DVC THERMAL-COAL 50000 306673 34987
KODERMA TPS DVC THERMAL-COAL 100000 380180 38131
PANCHET HPS DVC HYDRO-HYDRO 8000 13360 17984
TILLAYA HPS DVC HYDRO-HYDRO 400 1410 17984
RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34700 35400
TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 277300 23200
TLDP -III NHPC LTD HYDRO-HYDRO 13200 55400 62000
TLDP -IV NHPC LTD HYDRO-HYDRO 16000 60300 25600
FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 957219 33700
FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 308943 41000
BONGAINGAON TPS NTPC LTD THERMAL-COAL 25000 153663 58600
KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 542277 34200
KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 942591 34200
BARH-II NTPC LTD THERMAL-COAL 132000 728021 44500
TALCHER TPS NTPC LTD THERMAL-COAL 46000 335521 30100
TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 702319 25600
TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1436521 24700
STATE SECTOR
BTPS(RampM) BIHAR STATE PGCL THERMAL-COAL 22000 12142 39700
BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 98331 10602
HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 50593 9482
CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 19689 2605
RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 53192 6033
UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 147208 14637
Page 40
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 60353 4519
IB TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 288567 25000
J P H GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 210 038 61100
MEYONG CHU GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 400 1086 61100
TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 122667 38200
DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 214339 43321
KOLAGHAT THERMAL POWER
STATION
WEST BENGAL PDCL THERMAL-COAL 126000 538269 31603
BAKRESHWAR THERMAL POWER
PLANT
WEST BENGAL PDCL THERMAL-COAL 105000 634876 32154
BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 45000 166855 33299
SANTHALDIH THERMAL POWER
STATION
WEST BENGAL PDCL THERMAL-COAL 50000 336442 34932
SAGARDIGHI THERMAL POWER
PROJECT
WEST BENGAL PDCL THERMAL-COAL 160000 423121 34705
JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 20344 68900
RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 24559 68900
TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 4623 68900
PURULIA PUMPED STORAGE
PROJECT
WEST BENGAL SEDCL HYDRO-HYDRO 90000 108816 68900
MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2768 68900
PRIVATE SECTOR
CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 49474 20230
CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 555500 70200
HALDIA ENERGY HALDIA ENERGY LTD THERMAL-COAL 60000 371000 50400
DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3688 63400
KAMALANGA TPS GMR KAMALANGA ENERGY LTD THERMAL-COAL 105000547670
33300
ADHUNIK POWER U-1 ADHUNIK POWER THERMAL-COAL 27000 158 44060
ADHUNIK POWER U-2 ADHUNIK POWER THERMAL-COAL 27000 168 44250
VL-JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 332800 23622
JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 43000 45250
JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 71700 37030
JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 70700 35920
JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 71100 38870
JOJOBERA UNIT 5 TATA POWER COM LTD THERMAL-COAL 12000 79300 44560
JOJOBERA UNIT 6 TATA POWER COM LTD THERMAL-WHR 12000 83700 12840
IEL KALINGANAGAR U-I TATA POWER COM LTD THERMAL-WG 6750 33400 22500
IEL KALINGANAGAR U-II TATA POWER COM LTD THERMAL-WG 6750 34800 22500
MAITHON UNIT 1 amp 2 TATA POWER COM LTD THERMAL-COAL 105000 678000 36100
HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 27500 24340
HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 28400 24340
HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 15800 24310
NORTH EASTERN REGION
CENTRAL SECTOR
LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 74100 36600
AGARTALA GT NEEPCO THERMAL-GAS 13500 88611 27210
ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 153111 32310
DOYANG HEP NEEPCO HYDRO-HYDRO 7500 25598 49801
KOPILI HEP NEEPCO HYDRO-HYDRO 20000 98186 11491
KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 19582 20237
KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 10310 17968
RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 124093 22945
TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 10100 17344 39000
STATE SECTOR
HYDRO POWER (122 Stns) ITANAGAR GOVT OF ARUNACHAL
PRADESHHYDRO-HYDRO 6971 6217270
24600
KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39514 17337
LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 82327 36810
NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 33318 48290
MYNTRIANG SHEP ST II ASSAM POWER GENCO HYDRO-HYDRO 300 567 35776
LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 9130 49200
LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 012 49200
DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 022 49200
TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 000 49200
UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 4990 16000
UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 6476 37000
UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 16494 14600
UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 3600 9556 15000
SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 758 8000
MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44070 44800
KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 154 41400
TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 091 41400
MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 411 41400
MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 394 41400
KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 760 41400
SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 3264 41400
LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 044 41400
BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 18953 28000
ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 43585 28200
GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 4080 11100
Note
LIG Lignite N Naptha WHR Waste Heat Recovery
Page 41
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) GAJ POWER HOUSE HPSEB HYDRO-HYDRO 1050 2914 26700
BANER POWER HOUSE HPSEB HYDRO-HYDRO 1200 2864 16200
HOLI POWER HOUSE HPSEB HYDRO-HYDRO 300 616 22500
THIROT POWER HOUSE HPSEB HYDRO-HYDRO 450 1126 22500
KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 1200 3064 22500
LARJI POWER HOUSE HPSEB HYDRO-HYDRO 12600 53677 23700
NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 250 750 31000
CHABA POWER HOUSE HPSEB HYDRO-HYDRO 175 465 23300
RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 150 101 13400
SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 200 000 22500
KILLAR HPSEB HYDRO-HYDRO 030 050 22500
BHABA AUGUMENP H HPSEB HYDRO-HYDRO 450 1276 22500
BS CHAMBA HPSEB HYDRO-HYDRO 045 099 19500
GUMMA HPSEB HYDRO-HYDRO 300 423 22500
GAS TURBINE POWER STATION IPGCL THERMAL-GAS 27000 67233 39300
PPS-I PPCL THERMAL-GAS 33000 175905 38300
PPS-III PPCL THERMAL-GAS 137120 196879 36100
LOWER JHELUM JampKPDD HYDRO-HYDRO 10500 60214 5100
UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 2260 10514 6300
UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 10500 44202 8500
GANDHARBAL JampKPDD HYDRO-HYDRO 1500 8925 4700
KARNAH MPH JampKPDD HYDRO-HYDRO 200 1122 31000
CHENANI I JampKPDD HYDRO-HYDRO 2330 10892 6600
CHENANI II JampKPDD HYDRO-HYDRO 200 1188 9300
CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 750 3634 14200
IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 375 2108 18500
IGO MERCHELLONG JampKPDD HYDRO-HYDRO 300 1572 29700
PAHALGAM MHP JampKPDD HYDRO-HYDRO 450 1713 32900
MARPACHOO JampKPDD HYDRO-HYDRO 075 375 29800
HAFTAL JampKPDD HYDRO-HYDRO 100 483 28700
SANJAK JampKPDD HYDRO-HYDRO 126 441 36000
SEWA-III JampKPDD HYDRO-HYDRO 900 3273 20200
BHADERWAH JampKPDD HYDRO-HYDRO 150 935 8900
BAZGO JampKPDD HYDRO-HYDRO 030 108 33300
SUMOOR JampKPDD HYDRO-HYDRO 010 045 35400
HUNDER JampKPDD HYDRO-HYDRO 040 176 26200
STAKNA JampKPDD HYDRO-HYDRO 400 1933 4100
KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 124000 662879 31360
SURATGARH TPS RRVUNL THERMAL-COAL 150000 402328 41730
CHHABRA TPS 1amp 2 RRVUNL THERMAL-COAL 50000 305946 36700
CHHABRA TPS 3 RRVUNL THERMAL-COAL 25000 151536 36700
CHHABRA TPS 4 RRVUNL THERMAL-COAL 25000 155896 36700
RAMGARH GT POWER PROJECT RRVUNL THERMAL-COAL 22050 43177 41800
RAMGARH GAS T P PROJECT 3 RRVUNL THERMAL-GAS 5000 93615 41800
DHOLPUR C C POWER PROJECT RRVUNL THERMAL-R-LNG 33000 9486 46110
MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 14000 20855 34192
MINI MICRO HYDEL (MMH) P S RRVUNL HYDRO-HYDRO 2385 851 37800
KALISINDH TPP 1 RRVUNL THERMAL-COAL 60000 341543 45000
KALISINDH TPP 2 RRVUNL THERMAL-COAL 60000 211588 45000
KHARA HEP UPJVNL HYDRO-HYDRO 7200 26654 7200
MATATILLA HEP UPJVNL HYDRO-HYDRO 3060 12219 6500
OBRA HEP UPJVNL HYDRO-HYDRO 9900 21517 6300
RIHAND UPJVNL HYDRO-HYDRO 30000 57369 5500
ANPARA A TPS UPRVUNL THERMAL-COAL 63000 317536 27000
ANPARA B TPS UPRVUNL THERMAL-COAL 100000 705605 22700
ANPARA D UPRVUNL THERMAL-COAL 100000 300158 39800
HARDUAGANJ TPS UPRVUNL THERMAL-COAL 16500 45817 49200
HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 50000 304389 46600
OBRA A TPS UPRVUNL THERMAL-COAL 28800 13158 34000
OBRA B TPS UPRVUNL THERMAL-COAL 100000 328124 21900
Page 34
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) PANKI TPS UPRVUNL THERMAL-COAL 21000 66488 50300
PARICHHA TPS UPRVUNL THERMAL-COAL 22000 38762 49400
PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 42000 231931 45600
PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 50000 276722 50400
CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 24000 70845 8290
CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 14400 75366 8390
DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 3375 9595 12080
DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 5100 18701 10520
KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4140 17359 12330
KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 12000 33001 9420
KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 3000 11953 8320
TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 9000 33983 12460
MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 30400 124510 16110
RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 19800 17897 10550
MPUR UTTARAKHAND JVNL HYDRO-HYDRO 930 5121 19200
PATHRI UTTARAKHAND JVNL HYDRO-HYDRO 2040 11636 14200
GALOGI UTTARAKHAND JVNL HYDRO-HYDRO 300 648 12500
PRIVATE SECTOR
MGTPP CLP INDIA PVT LTD THERMAL-COAL 132000 268902 41940
SHRINAGAR HEP ALAKNANDA HPCL HYDRO-HYDRO 33000 127414 48800
GAMA INFRAPROP CCPP GAMA INFRAPROP PVT THERMAL-GAS 22500 52686 47000
PPGCL (BARA) JP POWER VENTURES LTD THERMAL-COAL 198000 448200 38500
MALANA HEP MALANA PCL HYDRO-HYDRO 8600 26354 29792
MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 10000 30369 32580
ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 19200 56347 36079
KASHANG HEP H P PCL HYDRO-HYDRO 19500 5034 29200
BASPA-II HEP HBPCL HYDRO-HYDRO 30000 132769 13600
KARCHAM WANGTOO HEP HBPCL HYDRO-HYDRO 100000 434386 36600
RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 108000 582600 43700
RITHALA COMBI CY POWER PLANT TATA POWER DDL THERMAL-GAS 9480 000 11900
RAJPURA TPS NABHA POWER LTD THERMAL-GAS 140000 901484 39000
TALWANDI SABO POWER LTD TALWANDI SABO POWER LTD THERMAL-COAL 198000 636040 49548
ROJA THERMAL POWER STATION ROJA POWER SCL THERMAL-COAL 120000 727200 43400
KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 34400 63400
BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 36000 62600
MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 38200 60800
UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 37900 61500
KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 42300 58800
LALITPUR PGCL BAJAJ ENERGY PVT LTD THERMAL-COAL 198000 359400 47300
PRAYAGRAJ PGCL PRAYAGRAJ PGCL THERMAL-COAL 132000 448200 38595
KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 132000 783182 33438
WESTERN REGION
CENTRAL SECTOR
INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 100000 325333 23892
OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 52000 141663 34001
GANDHAR CCPP NTPC LTD THERMAL-GAS 65739 221924 28700
KAWAS CCPP NTPC LTD THERMAL-GASN 65620 167929 27000
KORBA I amp II NTPC LTD THERMAL-COAL 210000 1499171 20500
KORBA III NTPC LTD THERMAL-COAL 50000 358746 26600
SIPAT STPS I NTPC LTD THERMAL-COAL 198000 1479902 26800
SIPAT STPS II NTPC LTD THERMAL-COAL 100000 766549 26500
VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 126000 693142 25800
VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 100000 608781 23800
VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 100000 673475 27600
VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 100000 655924 32900
VINDHYACHAL STPS V NTPC LTD THERMAL-COAL 50000 328265 31700
MOUDA I NTPC LTD THERMAL-COAL 100000 343130 44500
MOUDA Ii NTPC LTD THERMAL-COAL 66000 40637 39900
RATNAGIRI GAS amp POWER PVT LTD RGPPL THERMAL-GAS 196708 442485 47000
KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 000 24729
TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 32000 201227 10740
Page 35
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 365122 19069
TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 787444 29324
STATE SECTOR
GSEG-HAZIRA15610 MW GUJARAT S ENEGEN LTD THERMAL-GAS 15610 1805 28200
GSEG-HAZIRA35143 MW GUJARAT S ENEGEN LTD THERMAL-GAS 35130 22276 51300
GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 21978 51800
AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 13929 26100
KORBA TPS EAST CSPGCL THERMAL-COAL 44000 198673 33880
DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 365808 27570
KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 316500 30420
HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 532878 19410
CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 515 58300
MTTPS CHAMPA U-I CSPGCL THERMAL-COAL 50000 220376 39000
MTTPS CHAMPA U-II CSPGCL THERMAL-COAL 50000 23709 10000
SHP GANGREL CSPGCL HYDRO-HYDRO 1000 2350 36790
BANGO HEP CSPGCL HYDRO-HYDRO 12000 14662 8900
MHP KORBA WEST CSPGCL HYDRO-HYDRO 170 859 38190
SIKASAR HEP CSPGCL HYDRO-HYDRO 700 418 26870
DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8843 74500
DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 19446 51500
GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 66388 71600
GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127488 41300
KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 96072 43900
KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 29841 56400
SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 184966 58800
UKAI 1-5 GSECL THERMAL-COAL 85000 204891 46900
UKAI TPS 6 GSECL THERMAL-COAL 50000 284448 48200
WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 271999 58300
WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 82808 44100
KADANA HPS GSECL HYDRO-HYDRO 24200 34433 16800
UKAI HPS GSECL HYDRO-HYDRO 30500 40585 6100
TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 123000 11500
BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 8900 10900
BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 7200 27500
JHINNA HPS MPPGCL HYDRO-HYDRO 2000 9700 18500
RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 44300 3400
GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 17300 4600
SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 4100 16900
MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 14600 27000
PENCH HPS MPPGCL HYDRO-HYDRO 16000 23700 8100
RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 3000 16900
AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 134400 35100
SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 283800 38700
SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 344600 34300
SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 111600 61600
SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 211800 58000
SSTPS PH-I MPPGCL THERMAL-COAL 120000 233100 84300
BHUSAWAL TPS MSPGCL THERMAL-COAL 142000 566258 51100
CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1365682 33700
KHAPERKHEDA MSPGCL THERMAL-COAL 134000 706207 39100
KORADI TPS MSPGCL THERMAL-COAL 62000 443206 42000
NASIK TPS MSPGCL THERMAL-COAL 63000 297275 47000
PARLI TPS MSPGCL THERMAL-COAL 113000 175934 71600
PARAS MSPGCL THERMAL-COAL 50000 267931 38700
URAN CCPP MSPGCL THERMAL-GAS 67200 320330 30600
KOYANA MSPGCL HYDRO-HYDRO 195600 328155 13100
SMALL HYDRO POWER PLANTS MSPGCL HYDRO-HYDRO 45400 93062 30500
BHIRA MSPGCL HYDRO-HYDRO 8000 10046 8400
TILLARI MSPGCL HYDRO-HYDRO 8900 10584 3100
SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 233298 20500
SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 87633 20500
PRIVATE SECTOR
Page 36
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 81282 46750
JNSTPP(JAYPEE NIGRIE) JP POWER VENTURES LTD THERMAL-COAL 132000 726695 29310
MB POWER MB POWER THERMAL-COAL 120000 345632 38310
ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 754922 28671
ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 780761 23495
ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 198000 1263784 32090
ADANI POWER MAHARA ADANI POWER LTD THERMAL-COAL 330000 1666191 34124
AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 170065 36827
SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 252035 45129
ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 458551 36000
ESSAR POWER MP LTD ESSAR POWER MP LTD THERMAL-COAL 60000 243040 28600
VEDANTA LTD (P P -I) VEDANTA LTD THERMAL-GAS 3000 15044 24000
VEDANTA LTD (P P -II) VEDANTA LTD THERMAL-GAS 3000 21293 24000
PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 8234600 24000
165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 5850 64390
145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 68717 40349
SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 132655 28776
SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 144686 38567
MUNDRA UMPPCOASTAL GUJARAT POWER
LTD THERMAL-IMP COAL 400000 2530300
23900
LANCO AMARKANTAK TPP PATHADIH
U-ILANCO AMARKAN POWER LTD THERMAL-COAL 30000 195500
29200
LANCO AMARKANTAK TPP PATHADIH
U-IILANCO AMARKAN POWER LTD THERMAL-COAL 30000 206900
27600
BARADARHA TPS D B POWER LTD THERMAL-COAL 120000 677373 29200
JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 405000 28900
JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 453000 40500
DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 339437 40700
TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 293400 44000
TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 137200 37000
TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 174900 44000
BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 92900 14100
BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23700 34300
KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 27600 48300
CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2530300 23900
BHANDARDRA HEP -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 2475 54900
SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 161400 26500
SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 445000 39000
SOTHERN REGION
CENTRAL SECTOR
NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 325699 54820
NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 305532 39880
NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 998805 38510
NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 113016 54070
NEYVELI TAMILNADU POWER LTD JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 625274 42200
VALLUR TPS NTPC TECL THERMAL-COAL 150000 856438 42350
R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 1493 84300
RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1502919 29400
RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 341291 31800
SIMHADRI I NTPC LTD THERMAL-COAL 100000 688382 36800
SIMHADRI II NTPC LTD THERMAL-COAL 100000 663657 43400
KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 593110 31324
MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 291625 21764
KKNPP-1 amp 2 NPCIL NUCLEAR-NUCLEAR 200000 572609 40948
MINICOY LAKSHADEEP THERMAL-DIESEL 340 770 29600
KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1097 29600
AMINI LAKSHADEEP THERMAL-DIESEL 265 509 29600
ANDROTT LAKSHADEEP THERMAL-DIESEL 219 524 29600
KALPENI LAKSHADEEP THERMAL-DIESEL 175 356 29600
AGATTI LAKSHADEEP THERMAL-DIESEL 195 658 29600
KADMAT LAKSHADEEP THERMAL-DIESEL 190 414 29600
KILTAN LAKSHADEEP THERMAL-DIESEL 150 269 29600
CHETLET LAKSHADEEP THERMAL-DIESEL 100 139 29600
BITRA LAKSHADEEP THERMAL-DIESEL 043 024 29600
BANGARAM LAKSHADEEP THERMAL-DIESEL 018 009 29600
Page 37
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) STATE SECTOR
Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 721811 46500
Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 50000 336142 46500
RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 237358 46500
RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 239926 46500
RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 124500 46500
SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 62109 46500
UPPER SILERU APGENCO HYDRO-HYDRO 24000 33000 46500
LOWER SILERU APGENCO HYDRO-HYDRO 46000 81066 46500
DONKARAI APGENCO HYDRO-HYDRO 2500 6007 46500
PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 1262 46500
CHETTIPETA APGENCO HYDRO-HYDRO 100 214 46500
MUCHKUND APGENCO HYDRO-HYDRO 12000 37571 46500
NAGARJUNASAGAR RCPH APGENCO HYDRO-HYDRO 9000 606 46500
TUNGABHADRA HES amp HAMPI(AP
Share)
APGENCO HYDRO-HYDRO 7200 6100 46500
KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 352232 42600
KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 288131 32500
KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 319272 46500
RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 40073 44300
KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 308317 46000
KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 308963 51300
SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 61004 76600
NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 17960 75300
PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 20873 58300
POCHAMPAD-I TSPGENCO HYDRO-HYDRO 2700 5455 29800
POCHAMPAD-II TSPGENCO HYDRO-HYDRO 900 1932 40700
NIZAMSAGAR TSPGENCO HYDRO-HYDRO 1000 1126 53400
RAICHUR TPS 1 to 7 KPCL THERMAL-COAL 147000 890866 43800
RAICHUR TPS 8 KPCL THERMAL-COAL 25000 159523 48200
BELLARI TPS 1 KPCL THERMAL-COAL 50000 318679 51100
BELLARI TPS 2 KPCL THERMAL-COAL 50000 232347 55600
BELLARI TPS 3 KPCL THERMAL-COAL 70000 47565 34400
BHADRA PH KPCL HYDRO-HYDRO 3920 2369 45900
GERUSUPPA PH KPCL HYDRO-HYDRO 24000 26990 22000
GHAT PRABHA HEP KPCL HYDRO-HYDRO 3200 4777 25300
KADRA HPS KPCL HYDRO-HYDRO 15000 16889 26800
NAGJHARI KPCL HYDRO-HYDRO 90000 155159 9800
KODASALLI DPH KPCL HYDRO-HYDRO 12000 14854 19200
MUNIRA+MGH+SPH+SPH KPCL HYDRO-HYDRO 22640 48211 7900
SHARAVATHY HPS KPCL HYDRO-HYDRO 108550 276215 5400
ALMATTI DPH KPCL HYDRO-HYDRO 29000 39611 24600
VARAHI UGPH KPCL HYDRO-HYDRO 46000 71368 15600
IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 17196 15300
IDUKKI HPS KSEB HYDRO-HYDRO 78000 137905 15300
KAKKAD HPS KSEB HYDRO-HYDRO 5000 13063 15300
KALLADA HPS KSEB HYDRO-HYDRO 1500 4436 15300
KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 46544 15300
KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 635 15300
LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 30822 15300
MALANKARA HPS KSEB HYDRO-HYDRO 1050 2474 15300
MATTUPETTY KSEB HYDRO-HYDRO 200 230 15300
MALAMPUZHA KSEB HYDRO-HYDRO 250 063 15300
CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 864 15300
URUMI ST I amp II KSEB HYDRO-HYDRO 615 903 15300
LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 248 15300
NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7765 19625 15300
PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 16601 15300
PANNIAR HPS KSEB HYDRO-HYDRO 3240 6217 15300
PORINGALKUTHU KSEB HYDRO-HYDRO 3600 10052 15300
PORINGALKUTHU LBE KSEB HYDRO-HYDRO 1600 9438 15300
PEPPARA KSEB HYDRO-HYDRO 300 395 15300
POOZHITHODE KSEB HYDRO-HYDRO 480 1045 15300
Page 38
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) PEECHI KSEB HYDRO-HYDRO 125 040 15300
RANI-PERUNADU KSEB HYDRO-HYDRO 400 585 15300
SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 79783 15300
SENGULAM HPS KSEB HYDRO-HYDRO 5120 11558 15300
SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 16711 15300
VILANGAD KSEB HYDRO-HYDRO 750 1578 15300
BARAPOLE KSEB HYDRO-HYDRO 1500 1932 15300
VELLATHOOVAL KSEB HYDRO-HYDRO 360 305 15300
CHIM0NY KSEB HYDRO-HYDRO 250 156 15300
ADYANPARA KSEB HYDRO-HYDRO 350 501 15300
BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 554 15300
KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 3801 15300
KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 23132 32800
ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 14416 62280
METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 523970 62280
METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 321270 62280
NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 336575 62280
NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 591240 62280
TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 508966 62280
KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 30897 62280
VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 18720 90699 62280
KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 33593 62280
BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 1047 62280
PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 1250 62280
PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 330 62280
MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 4897 62280
MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 032 62280
KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15681 62280
KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 40608 62280
KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 21342 62280
KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 4717 62280
KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4322 62280
KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2399 62280
METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 4416 62280
METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 8035 62280
BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2187 62280
BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2359 62280
BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2511 62280
BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 1949 62280
BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 1819 62280
POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 172 62280
SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 241 62280
MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 026 62280
THIRUMOORTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 136 62280
PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 9309 62280
VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 353 62280
SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 4192 62280
PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 6571 62280
SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 1186 62280
SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6319 62280
ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 6122 62280
KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 28674 62280
SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 18381 62280
SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 4258 62280
KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 12680 62280
KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4201 62280
ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 000 62280
PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 19175 62280
AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 078 62280
BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 504 62280
BHAVANI KATTALAI (BKB)(IIIampIII BB I amp II)TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 5847 62280
PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 000 62280
Page 39
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) SRI DAMODARAM STPS APPDCL THERMAL-COAL 160000 808108 36300
PRIVATE SECTOR
KARUPPUR TANJORE LANCO TANJORE PCL THERMAL-GAS 12000 48096 28770
SIMHAPURI ENERGY LTD SIMHAPURI ENERGY LTD THERMAL-COAL 60000 143900 39100
JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 7111 45500
SBU 1 JSW ENERGY LTD
VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 26000 159100
43300
SBU 2 JSW ENERGY LTD
VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 60000 247900
42800
LANCO KPLLANCO KONDAPALLI POWER
LTDTHERMAL-GAS 36814 85060
25776
LANCO KPL STG -IILANCO KONDAPALLI POWER
LTDTHERMAL-GAS 36600 12979
46330
LANCO KPL STG -IIIALANCO KONDAPALLI POWER
LTDTHERMAL-GAS 37100 85710
46330
LANCO KPL STG -III BLANCO KONDAPALLI POWER
LTDTHERMAL-GAS 37100 43639
46330
HINDUJA NATIONAL PCL HINDUJA NATIONAL PCL THERMAL-COAL 104000 303000 38200
MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 121164 49940
UDUPI POWER COR LTD ADANI POWER LTD THERMAL-COAL 120000 754613 42500
SPECTRUM POWER GENERATION
LTD SPECTRUM PG LTD THERMAL-GASN 20525 9256812
34952
TAQA NEYVELI POWER COM PVT
LTD TAQA NEYVELI THERMAL-LIG 25000 5840
34500
ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 251000 51000
ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 207860 36800
GMR VEMAGIRI POWER GENERATION
LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 30117
46450
EASTERN REGION
CENTRAL SECTOR
MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 64675 53113
MTPS STAGE - II KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 39000 1432 69138
BOKARO `B` TPS DVC THERMAL-COAL 63000 145670 31539
MEJIA TPS U 1-3 DVC THERMAL-COAL 63000 348298 31552
MEJIA TPS U 4 DVC THERMAL-COAL 21000 116099 34997
MEJIA TPS U 5-6 DVC THERMAL-COAL 50000 276427 35976
MEJIA TPS U 7-8 DVC THERMAL-COAL 100000 552854 36991
DURGAPUR STEEL TPS DVC THERMAL-COAL 100000 665550 39323
DURGAPUR TPS DVC THERMAL-COAL 21000 59270 35416
RAGHUNATHPUR TPS DVC THERMAL-COAL 120000 201650 35326
MAITHON HYDEL STA DVC HYDRO-HYDRO 6320 12200 17984
CHANDRAPURA TPSU1-3 DVC THERMAL-COAL 42000 257610 35095
CHANDRAPURA TPSU7-8 DVC THERMAL-COAL 50000 306673 34987
KODERMA TPS DVC THERMAL-COAL 100000 380180 38131
PANCHET HPS DVC HYDRO-HYDRO 8000 13360 17984
TILLAYA HPS DVC HYDRO-HYDRO 400 1410 17984
RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34700 35400
TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 277300 23200
TLDP -III NHPC LTD HYDRO-HYDRO 13200 55400 62000
TLDP -IV NHPC LTD HYDRO-HYDRO 16000 60300 25600
FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 957219 33700
FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 308943 41000
BONGAINGAON TPS NTPC LTD THERMAL-COAL 25000 153663 58600
KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 542277 34200
KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 942591 34200
BARH-II NTPC LTD THERMAL-COAL 132000 728021 44500
TALCHER TPS NTPC LTD THERMAL-COAL 46000 335521 30100
TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 702319 25600
TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1436521 24700
STATE SECTOR
BTPS(RampM) BIHAR STATE PGCL THERMAL-COAL 22000 12142 39700
BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 98331 10602
HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 50593 9482
CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 19689 2605
RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 53192 6033
UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 147208 14637
Page 40
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 60353 4519
IB TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 288567 25000
J P H GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 210 038 61100
MEYONG CHU GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 400 1086 61100
TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 122667 38200
DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 214339 43321
KOLAGHAT THERMAL POWER
STATION
WEST BENGAL PDCL THERMAL-COAL 126000 538269 31603
BAKRESHWAR THERMAL POWER
PLANT
WEST BENGAL PDCL THERMAL-COAL 105000 634876 32154
BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 45000 166855 33299
SANTHALDIH THERMAL POWER
STATION
WEST BENGAL PDCL THERMAL-COAL 50000 336442 34932
SAGARDIGHI THERMAL POWER
PROJECT
WEST BENGAL PDCL THERMAL-COAL 160000 423121 34705
JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 20344 68900
RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 24559 68900
TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 4623 68900
PURULIA PUMPED STORAGE
PROJECT
WEST BENGAL SEDCL HYDRO-HYDRO 90000 108816 68900
MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2768 68900
PRIVATE SECTOR
CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 49474 20230
CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 555500 70200
HALDIA ENERGY HALDIA ENERGY LTD THERMAL-COAL 60000 371000 50400
DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3688 63400
KAMALANGA TPS GMR KAMALANGA ENERGY LTD THERMAL-COAL 105000547670
33300
ADHUNIK POWER U-1 ADHUNIK POWER THERMAL-COAL 27000 158 44060
ADHUNIK POWER U-2 ADHUNIK POWER THERMAL-COAL 27000 168 44250
VL-JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 332800 23622
JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 43000 45250
JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 71700 37030
JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 70700 35920
JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 71100 38870
JOJOBERA UNIT 5 TATA POWER COM LTD THERMAL-COAL 12000 79300 44560
JOJOBERA UNIT 6 TATA POWER COM LTD THERMAL-WHR 12000 83700 12840
IEL KALINGANAGAR U-I TATA POWER COM LTD THERMAL-WG 6750 33400 22500
IEL KALINGANAGAR U-II TATA POWER COM LTD THERMAL-WG 6750 34800 22500
MAITHON UNIT 1 amp 2 TATA POWER COM LTD THERMAL-COAL 105000 678000 36100
HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 27500 24340
HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 28400 24340
HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 15800 24310
NORTH EASTERN REGION
CENTRAL SECTOR
LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 74100 36600
AGARTALA GT NEEPCO THERMAL-GAS 13500 88611 27210
ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 153111 32310
DOYANG HEP NEEPCO HYDRO-HYDRO 7500 25598 49801
KOPILI HEP NEEPCO HYDRO-HYDRO 20000 98186 11491
KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 19582 20237
KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 10310 17968
RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 124093 22945
TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 10100 17344 39000
STATE SECTOR
HYDRO POWER (122 Stns) ITANAGAR GOVT OF ARUNACHAL
PRADESHHYDRO-HYDRO 6971 6217270
24600
KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39514 17337
LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 82327 36810
NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 33318 48290
MYNTRIANG SHEP ST II ASSAM POWER GENCO HYDRO-HYDRO 300 567 35776
LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 9130 49200
LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 012 49200
DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 022 49200
TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 000 49200
UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 4990 16000
UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 6476 37000
UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 16494 14600
UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 3600 9556 15000
SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 758 8000
MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44070 44800
KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 154 41400
TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 091 41400
MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 411 41400
MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 394 41400
KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 760 41400
SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 3264 41400
LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 044 41400
BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 18953 28000
ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 43585 28200
GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 4080 11100
Note
LIG Lignite N Naptha WHR Waste Heat Recovery
Page 41
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) PANKI TPS UPRVUNL THERMAL-COAL 21000 66488 50300
PARICHHA TPS UPRVUNL THERMAL-COAL 22000 38762 49400
PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 42000 231931 45600
PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 50000 276722 50400
CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 24000 70845 8290
CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 14400 75366 8390
DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 3375 9595 12080
DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 5100 18701 10520
KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4140 17359 12330
KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 12000 33001 9420
KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 3000 11953 8320
TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 9000 33983 12460
MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 30400 124510 16110
RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 19800 17897 10550
MPUR UTTARAKHAND JVNL HYDRO-HYDRO 930 5121 19200
PATHRI UTTARAKHAND JVNL HYDRO-HYDRO 2040 11636 14200
GALOGI UTTARAKHAND JVNL HYDRO-HYDRO 300 648 12500
PRIVATE SECTOR
MGTPP CLP INDIA PVT LTD THERMAL-COAL 132000 268902 41940
SHRINAGAR HEP ALAKNANDA HPCL HYDRO-HYDRO 33000 127414 48800
GAMA INFRAPROP CCPP GAMA INFRAPROP PVT THERMAL-GAS 22500 52686 47000
PPGCL (BARA) JP POWER VENTURES LTD THERMAL-COAL 198000 448200 38500
MALANA HEP MALANA PCL HYDRO-HYDRO 8600 26354 29792
MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 10000 30369 32580
ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 19200 56347 36079
KASHANG HEP H P PCL HYDRO-HYDRO 19500 5034 29200
BASPA-II HEP HBPCL HYDRO-HYDRO 30000 132769 13600
KARCHAM WANGTOO HEP HBPCL HYDRO-HYDRO 100000 434386 36600
RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 108000 582600 43700
RITHALA COMBI CY POWER PLANT TATA POWER DDL THERMAL-GAS 9480 000 11900
RAJPURA TPS NABHA POWER LTD THERMAL-GAS 140000 901484 39000
TALWANDI SABO POWER LTD TALWANDI SABO POWER LTD THERMAL-COAL 198000 636040 49548
ROJA THERMAL POWER STATION ROJA POWER SCL THERMAL-COAL 120000 727200 43400
KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 34400 63400
BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 36000 62600
MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 38200 60800
UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 37900 61500
KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 42300 58800
LALITPUR PGCL BAJAJ ENERGY PVT LTD THERMAL-COAL 198000 359400 47300
PRAYAGRAJ PGCL PRAYAGRAJ PGCL THERMAL-COAL 132000 448200 38595
KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 132000 783182 33438
WESTERN REGION
CENTRAL SECTOR
INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 100000 325333 23892
OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 52000 141663 34001
GANDHAR CCPP NTPC LTD THERMAL-GAS 65739 221924 28700
KAWAS CCPP NTPC LTD THERMAL-GASN 65620 167929 27000
KORBA I amp II NTPC LTD THERMAL-COAL 210000 1499171 20500
KORBA III NTPC LTD THERMAL-COAL 50000 358746 26600
SIPAT STPS I NTPC LTD THERMAL-COAL 198000 1479902 26800
SIPAT STPS II NTPC LTD THERMAL-COAL 100000 766549 26500
VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 126000 693142 25800
VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 100000 608781 23800
VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 100000 673475 27600
VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 100000 655924 32900
VINDHYACHAL STPS V NTPC LTD THERMAL-COAL 50000 328265 31700
MOUDA I NTPC LTD THERMAL-COAL 100000 343130 44500
MOUDA Ii NTPC LTD THERMAL-COAL 66000 40637 39900
RATNAGIRI GAS amp POWER PVT LTD RGPPL THERMAL-GAS 196708 442485 47000
KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 000 24729
TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 32000 201227 10740
Page 35
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 365122 19069
TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 787444 29324
STATE SECTOR
GSEG-HAZIRA15610 MW GUJARAT S ENEGEN LTD THERMAL-GAS 15610 1805 28200
GSEG-HAZIRA35143 MW GUJARAT S ENEGEN LTD THERMAL-GAS 35130 22276 51300
GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 21978 51800
AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 13929 26100
KORBA TPS EAST CSPGCL THERMAL-COAL 44000 198673 33880
DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 365808 27570
KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 316500 30420
HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 532878 19410
CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 515 58300
MTTPS CHAMPA U-I CSPGCL THERMAL-COAL 50000 220376 39000
MTTPS CHAMPA U-II CSPGCL THERMAL-COAL 50000 23709 10000
SHP GANGREL CSPGCL HYDRO-HYDRO 1000 2350 36790
BANGO HEP CSPGCL HYDRO-HYDRO 12000 14662 8900
MHP KORBA WEST CSPGCL HYDRO-HYDRO 170 859 38190
SIKASAR HEP CSPGCL HYDRO-HYDRO 700 418 26870
DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8843 74500
DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 19446 51500
GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 66388 71600
GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127488 41300
KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 96072 43900
KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 29841 56400
SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 184966 58800
UKAI 1-5 GSECL THERMAL-COAL 85000 204891 46900
UKAI TPS 6 GSECL THERMAL-COAL 50000 284448 48200
WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 271999 58300
WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 82808 44100
KADANA HPS GSECL HYDRO-HYDRO 24200 34433 16800
UKAI HPS GSECL HYDRO-HYDRO 30500 40585 6100
TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 123000 11500
BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 8900 10900
BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 7200 27500
JHINNA HPS MPPGCL HYDRO-HYDRO 2000 9700 18500
RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 44300 3400
GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 17300 4600
SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 4100 16900
MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 14600 27000
PENCH HPS MPPGCL HYDRO-HYDRO 16000 23700 8100
RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 3000 16900
AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 134400 35100
SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 283800 38700
SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 344600 34300
SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 111600 61600
SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 211800 58000
SSTPS PH-I MPPGCL THERMAL-COAL 120000 233100 84300
BHUSAWAL TPS MSPGCL THERMAL-COAL 142000 566258 51100
CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1365682 33700
KHAPERKHEDA MSPGCL THERMAL-COAL 134000 706207 39100
KORADI TPS MSPGCL THERMAL-COAL 62000 443206 42000
NASIK TPS MSPGCL THERMAL-COAL 63000 297275 47000
PARLI TPS MSPGCL THERMAL-COAL 113000 175934 71600
PARAS MSPGCL THERMAL-COAL 50000 267931 38700
URAN CCPP MSPGCL THERMAL-GAS 67200 320330 30600
KOYANA MSPGCL HYDRO-HYDRO 195600 328155 13100
SMALL HYDRO POWER PLANTS MSPGCL HYDRO-HYDRO 45400 93062 30500
BHIRA MSPGCL HYDRO-HYDRO 8000 10046 8400
TILLARI MSPGCL HYDRO-HYDRO 8900 10584 3100
SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 233298 20500
SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 87633 20500
PRIVATE SECTOR
Page 36
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 81282 46750
JNSTPP(JAYPEE NIGRIE) JP POWER VENTURES LTD THERMAL-COAL 132000 726695 29310
MB POWER MB POWER THERMAL-COAL 120000 345632 38310
ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 754922 28671
ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 780761 23495
ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 198000 1263784 32090
ADANI POWER MAHARA ADANI POWER LTD THERMAL-COAL 330000 1666191 34124
AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 170065 36827
SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 252035 45129
ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 458551 36000
ESSAR POWER MP LTD ESSAR POWER MP LTD THERMAL-COAL 60000 243040 28600
VEDANTA LTD (P P -I) VEDANTA LTD THERMAL-GAS 3000 15044 24000
VEDANTA LTD (P P -II) VEDANTA LTD THERMAL-GAS 3000 21293 24000
PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 8234600 24000
165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 5850 64390
145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 68717 40349
SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 132655 28776
SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 144686 38567
MUNDRA UMPPCOASTAL GUJARAT POWER
LTD THERMAL-IMP COAL 400000 2530300
23900
LANCO AMARKANTAK TPP PATHADIH
U-ILANCO AMARKAN POWER LTD THERMAL-COAL 30000 195500
29200
LANCO AMARKANTAK TPP PATHADIH
U-IILANCO AMARKAN POWER LTD THERMAL-COAL 30000 206900
27600
BARADARHA TPS D B POWER LTD THERMAL-COAL 120000 677373 29200
JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 405000 28900
JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 453000 40500
DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 339437 40700
TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 293400 44000
TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 137200 37000
TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 174900 44000
BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 92900 14100
BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23700 34300
KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 27600 48300
CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2530300 23900
BHANDARDRA HEP -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 2475 54900
SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 161400 26500
SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 445000 39000
SOTHERN REGION
CENTRAL SECTOR
NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 325699 54820
NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 305532 39880
NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 998805 38510
NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 113016 54070
NEYVELI TAMILNADU POWER LTD JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 625274 42200
VALLUR TPS NTPC TECL THERMAL-COAL 150000 856438 42350
R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 1493 84300
RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1502919 29400
RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 341291 31800
SIMHADRI I NTPC LTD THERMAL-COAL 100000 688382 36800
SIMHADRI II NTPC LTD THERMAL-COAL 100000 663657 43400
KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 593110 31324
MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 291625 21764
KKNPP-1 amp 2 NPCIL NUCLEAR-NUCLEAR 200000 572609 40948
MINICOY LAKSHADEEP THERMAL-DIESEL 340 770 29600
KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1097 29600
AMINI LAKSHADEEP THERMAL-DIESEL 265 509 29600
ANDROTT LAKSHADEEP THERMAL-DIESEL 219 524 29600
KALPENI LAKSHADEEP THERMAL-DIESEL 175 356 29600
AGATTI LAKSHADEEP THERMAL-DIESEL 195 658 29600
KADMAT LAKSHADEEP THERMAL-DIESEL 190 414 29600
KILTAN LAKSHADEEP THERMAL-DIESEL 150 269 29600
CHETLET LAKSHADEEP THERMAL-DIESEL 100 139 29600
BITRA LAKSHADEEP THERMAL-DIESEL 043 024 29600
BANGARAM LAKSHADEEP THERMAL-DIESEL 018 009 29600
Page 37
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) STATE SECTOR
Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 721811 46500
Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 50000 336142 46500
RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 237358 46500
RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 239926 46500
RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 124500 46500
SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 62109 46500
UPPER SILERU APGENCO HYDRO-HYDRO 24000 33000 46500
LOWER SILERU APGENCO HYDRO-HYDRO 46000 81066 46500
DONKARAI APGENCO HYDRO-HYDRO 2500 6007 46500
PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 1262 46500
CHETTIPETA APGENCO HYDRO-HYDRO 100 214 46500
MUCHKUND APGENCO HYDRO-HYDRO 12000 37571 46500
NAGARJUNASAGAR RCPH APGENCO HYDRO-HYDRO 9000 606 46500
TUNGABHADRA HES amp HAMPI(AP
Share)
APGENCO HYDRO-HYDRO 7200 6100 46500
KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 352232 42600
KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 288131 32500
KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 319272 46500
RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 40073 44300
KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 308317 46000
KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 308963 51300
SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 61004 76600
NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 17960 75300
PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 20873 58300
POCHAMPAD-I TSPGENCO HYDRO-HYDRO 2700 5455 29800
POCHAMPAD-II TSPGENCO HYDRO-HYDRO 900 1932 40700
NIZAMSAGAR TSPGENCO HYDRO-HYDRO 1000 1126 53400
RAICHUR TPS 1 to 7 KPCL THERMAL-COAL 147000 890866 43800
RAICHUR TPS 8 KPCL THERMAL-COAL 25000 159523 48200
BELLARI TPS 1 KPCL THERMAL-COAL 50000 318679 51100
BELLARI TPS 2 KPCL THERMAL-COAL 50000 232347 55600
BELLARI TPS 3 KPCL THERMAL-COAL 70000 47565 34400
BHADRA PH KPCL HYDRO-HYDRO 3920 2369 45900
GERUSUPPA PH KPCL HYDRO-HYDRO 24000 26990 22000
GHAT PRABHA HEP KPCL HYDRO-HYDRO 3200 4777 25300
KADRA HPS KPCL HYDRO-HYDRO 15000 16889 26800
NAGJHARI KPCL HYDRO-HYDRO 90000 155159 9800
KODASALLI DPH KPCL HYDRO-HYDRO 12000 14854 19200
MUNIRA+MGH+SPH+SPH KPCL HYDRO-HYDRO 22640 48211 7900
SHARAVATHY HPS KPCL HYDRO-HYDRO 108550 276215 5400
ALMATTI DPH KPCL HYDRO-HYDRO 29000 39611 24600
VARAHI UGPH KPCL HYDRO-HYDRO 46000 71368 15600
IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 17196 15300
IDUKKI HPS KSEB HYDRO-HYDRO 78000 137905 15300
KAKKAD HPS KSEB HYDRO-HYDRO 5000 13063 15300
KALLADA HPS KSEB HYDRO-HYDRO 1500 4436 15300
KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 46544 15300
KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 635 15300
LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 30822 15300
MALANKARA HPS KSEB HYDRO-HYDRO 1050 2474 15300
MATTUPETTY KSEB HYDRO-HYDRO 200 230 15300
MALAMPUZHA KSEB HYDRO-HYDRO 250 063 15300
CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 864 15300
URUMI ST I amp II KSEB HYDRO-HYDRO 615 903 15300
LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 248 15300
NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7765 19625 15300
PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 16601 15300
PANNIAR HPS KSEB HYDRO-HYDRO 3240 6217 15300
PORINGALKUTHU KSEB HYDRO-HYDRO 3600 10052 15300
PORINGALKUTHU LBE KSEB HYDRO-HYDRO 1600 9438 15300
PEPPARA KSEB HYDRO-HYDRO 300 395 15300
POOZHITHODE KSEB HYDRO-HYDRO 480 1045 15300
Page 38
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) PEECHI KSEB HYDRO-HYDRO 125 040 15300
RANI-PERUNADU KSEB HYDRO-HYDRO 400 585 15300
SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 79783 15300
SENGULAM HPS KSEB HYDRO-HYDRO 5120 11558 15300
SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 16711 15300
VILANGAD KSEB HYDRO-HYDRO 750 1578 15300
BARAPOLE KSEB HYDRO-HYDRO 1500 1932 15300
VELLATHOOVAL KSEB HYDRO-HYDRO 360 305 15300
CHIM0NY KSEB HYDRO-HYDRO 250 156 15300
ADYANPARA KSEB HYDRO-HYDRO 350 501 15300
BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 554 15300
KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 3801 15300
KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 23132 32800
ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 14416 62280
METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 523970 62280
METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 321270 62280
NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 336575 62280
NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 591240 62280
TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 508966 62280
KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 30897 62280
VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 18720 90699 62280
KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 33593 62280
BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 1047 62280
PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 1250 62280
PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 330 62280
MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 4897 62280
MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 032 62280
KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15681 62280
KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 40608 62280
KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 21342 62280
KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 4717 62280
KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4322 62280
KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2399 62280
METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 4416 62280
METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 8035 62280
BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2187 62280
BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2359 62280
BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2511 62280
BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 1949 62280
BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 1819 62280
POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 172 62280
SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 241 62280
MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 026 62280
THIRUMOORTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 136 62280
PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 9309 62280
VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 353 62280
SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 4192 62280
PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 6571 62280
SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 1186 62280
SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6319 62280
ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 6122 62280
KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 28674 62280
SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 18381 62280
SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 4258 62280
KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 12680 62280
KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4201 62280
ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 000 62280
PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 19175 62280
AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 078 62280
BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 504 62280
BHAVANI KATTALAI (BKB)(IIIampIII BB I amp II)TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 5847 62280
PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 000 62280
Page 39
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) SRI DAMODARAM STPS APPDCL THERMAL-COAL 160000 808108 36300
PRIVATE SECTOR
KARUPPUR TANJORE LANCO TANJORE PCL THERMAL-GAS 12000 48096 28770
SIMHAPURI ENERGY LTD SIMHAPURI ENERGY LTD THERMAL-COAL 60000 143900 39100
JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 7111 45500
SBU 1 JSW ENERGY LTD
VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 26000 159100
43300
SBU 2 JSW ENERGY LTD
VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 60000 247900
42800
LANCO KPLLANCO KONDAPALLI POWER
LTDTHERMAL-GAS 36814 85060
25776
LANCO KPL STG -IILANCO KONDAPALLI POWER
LTDTHERMAL-GAS 36600 12979
46330
LANCO KPL STG -IIIALANCO KONDAPALLI POWER
LTDTHERMAL-GAS 37100 85710
46330
LANCO KPL STG -III BLANCO KONDAPALLI POWER
LTDTHERMAL-GAS 37100 43639
46330
HINDUJA NATIONAL PCL HINDUJA NATIONAL PCL THERMAL-COAL 104000 303000 38200
MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 121164 49940
UDUPI POWER COR LTD ADANI POWER LTD THERMAL-COAL 120000 754613 42500
SPECTRUM POWER GENERATION
LTD SPECTRUM PG LTD THERMAL-GASN 20525 9256812
34952
TAQA NEYVELI POWER COM PVT
LTD TAQA NEYVELI THERMAL-LIG 25000 5840
34500
ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 251000 51000
ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 207860 36800
GMR VEMAGIRI POWER GENERATION
LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 30117
46450
EASTERN REGION
CENTRAL SECTOR
MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 64675 53113
MTPS STAGE - II KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 39000 1432 69138
BOKARO `B` TPS DVC THERMAL-COAL 63000 145670 31539
MEJIA TPS U 1-3 DVC THERMAL-COAL 63000 348298 31552
MEJIA TPS U 4 DVC THERMAL-COAL 21000 116099 34997
MEJIA TPS U 5-6 DVC THERMAL-COAL 50000 276427 35976
MEJIA TPS U 7-8 DVC THERMAL-COAL 100000 552854 36991
DURGAPUR STEEL TPS DVC THERMAL-COAL 100000 665550 39323
DURGAPUR TPS DVC THERMAL-COAL 21000 59270 35416
RAGHUNATHPUR TPS DVC THERMAL-COAL 120000 201650 35326
MAITHON HYDEL STA DVC HYDRO-HYDRO 6320 12200 17984
CHANDRAPURA TPSU1-3 DVC THERMAL-COAL 42000 257610 35095
CHANDRAPURA TPSU7-8 DVC THERMAL-COAL 50000 306673 34987
KODERMA TPS DVC THERMAL-COAL 100000 380180 38131
PANCHET HPS DVC HYDRO-HYDRO 8000 13360 17984
TILLAYA HPS DVC HYDRO-HYDRO 400 1410 17984
RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34700 35400
TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 277300 23200
TLDP -III NHPC LTD HYDRO-HYDRO 13200 55400 62000
TLDP -IV NHPC LTD HYDRO-HYDRO 16000 60300 25600
FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 957219 33700
FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 308943 41000
BONGAINGAON TPS NTPC LTD THERMAL-COAL 25000 153663 58600
KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 542277 34200
KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 942591 34200
BARH-II NTPC LTD THERMAL-COAL 132000 728021 44500
TALCHER TPS NTPC LTD THERMAL-COAL 46000 335521 30100
TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 702319 25600
TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1436521 24700
STATE SECTOR
BTPS(RampM) BIHAR STATE PGCL THERMAL-COAL 22000 12142 39700
BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 98331 10602
HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 50593 9482
CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 19689 2605
RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 53192 6033
UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 147208 14637
Page 40
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 60353 4519
IB TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 288567 25000
J P H GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 210 038 61100
MEYONG CHU GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 400 1086 61100
TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 122667 38200
DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 214339 43321
KOLAGHAT THERMAL POWER
STATION
WEST BENGAL PDCL THERMAL-COAL 126000 538269 31603
BAKRESHWAR THERMAL POWER
PLANT
WEST BENGAL PDCL THERMAL-COAL 105000 634876 32154
BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 45000 166855 33299
SANTHALDIH THERMAL POWER
STATION
WEST BENGAL PDCL THERMAL-COAL 50000 336442 34932
SAGARDIGHI THERMAL POWER
PROJECT
WEST BENGAL PDCL THERMAL-COAL 160000 423121 34705
JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 20344 68900
RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 24559 68900
TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 4623 68900
PURULIA PUMPED STORAGE
PROJECT
WEST BENGAL SEDCL HYDRO-HYDRO 90000 108816 68900
MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2768 68900
PRIVATE SECTOR
CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 49474 20230
CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 555500 70200
HALDIA ENERGY HALDIA ENERGY LTD THERMAL-COAL 60000 371000 50400
DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3688 63400
KAMALANGA TPS GMR KAMALANGA ENERGY LTD THERMAL-COAL 105000547670
33300
ADHUNIK POWER U-1 ADHUNIK POWER THERMAL-COAL 27000 158 44060
ADHUNIK POWER U-2 ADHUNIK POWER THERMAL-COAL 27000 168 44250
VL-JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 332800 23622
JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 43000 45250
JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 71700 37030
JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 70700 35920
JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 71100 38870
JOJOBERA UNIT 5 TATA POWER COM LTD THERMAL-COAL 12000 79300 44560
JOJOBERA UNIT 6 TATA POWER COM LTD THERMAL-WHR 12000 83700 12840
IEL KALINGANAGAR U-I TATA POWER COM LTD THERMAL-WG 6750 33400 22500
IEL KALINGANAGAR U-II TATA POWER COM LTD THERMAL-WG 6750 34800 22500
MAITHON UNIT 1 amp 2 TATA POWER COM LTD THERMAL-COAL 105000 678000 36100
HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 27500 24340
HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 28400 24340
HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 15800 24310
NORTH EASTERN REGION
CENTRAL SECTOR
LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 74100 36600
AGARTALA GT NEEPCO THERMAL-GAS 13500 88611 27210
ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 153111 32310
DOYANG HEP NEEPCO HYDRO-HYDRO 7500 25598 49801
KOPILI HEP NEEPCO HYDRO-HYDRO 20000 98186 11491
KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 19582 20237
KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 10310 17968
RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 124093 22945
TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 10100 17344 39000
STATE SECTOR
HYDRO POWER (122 Stns) ITANAGAR GOVT OF ARUNACHAL
PRADESHHYDRO-HYDRO 6971 6217270
24600
KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39514 17337
LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 82327 36810
NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 33318 48290
MYNTRIANG SHEP ST II ASSAM POWER GENCO HYDRO-HYDRO 300 567 35776
LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 9130 49200
LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 012 49200
DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 022 49200
TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 000 49200
UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 4990 16000
UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 6476 37000
UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 16494 14600
UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 3600 9556 15000
SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 758 8000
MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44070 44800
KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 154 41400
TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 091 41400
MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 411 41400
MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 394 41400
KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 760 41400
SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 3264 41400
LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 044 41400
BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 18953 28000
ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 43585 28200
GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 4080 11100
Note
LIG Lignite N Naptha WHR Waste Heat Recovery
Page 41
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 365122 19069
TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 787444 29324
STATE SECTOR
GSEG-HAZIRA15610 MW GUJARAT S ENEGEN LTD THERMAL-GAS 15610 1805 28200
GSEG-HAZIRA35143 MW GUJARAT S ENEGEN LTD THERMAL-GAS 35130 22276 51300
GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 21978 51800
AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 13929 26100
KORBA TPS EAST CSPGCL THERMAL-COAL 44000 198673 33880
DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 365808 27570
KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 316500 30420
HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 532878 19410
CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 515 58300
MTTPS CHAMPA U-I CSPGCL THERMAL-COAL 50000 220376 39000
MTTPS CHAMPA U-II CSPGCL THERMAL-COAL 50000 23709 10000
SHP GANGREL CSPGCL HYDRO-HYDRO 1000 2350 36790
BANGO HEP CSPGCL HYDRO-HYDRO 12000 14662 8900
MHP KORBA WEST CSPGCL HYDRO-HYDRO 170 859 38190
SIKASAR HEP CSPGCL HYDRO-HYDRO 700 418 26870
DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8843 74500
DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 19446 51500
GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 66388 71600
GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127488 41300
KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 96072 43900
KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 29841 56400
SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 184966 58800
UKAI 1-5 GSECL THERMAL-COAL 85000 204891 46900
UKAI TPS 6 GSECL THERMAL-COAL 50000 284448 48200
WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 271999 58300
WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 82808 44100
KADANA HPS GSECL HYDRO-HYDRO 24200 34433 16800
UKAI HPS GSECL HYDRO-HYDRO 30500 40585 6100
TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 123000 11500
BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 8900 10900
BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 7200 27500
JHINNA HPS MPPGCL HYDRO-HYDRO 2000 9700 18500
RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 44300 3400
GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 17300 4600
SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 4100 16900
MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 14600 27000
PENCH HPS MPPGCL HYDRO-HYDRO 16000 23700 8100
RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 3000 16900
AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 134400 35100
SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 283800 38700
SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 344600 34300
SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 111600 61600
SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 211800 58000
SSTPS PH-I MPPGCL THERMAL-COAL 120000 233100 84300
BHUSAWAL TPS MSPGCL THERMAL-COAL 142000 566258 51100
CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1365682 33700
KHAPERKHEDA MSPGCL THERMAL-COAL 134000 706207 39100
KORADI TPS MSPGCL THERMAL-COAL 62000 443206 42000
NASIK TPS MSPGCL THERMAL-COAL 63000 297275 47000
PARLI TPS MSPGCL THERMAL-COAL 113000 175934 71600
PARAS MSPGCL THERMAL-COAL 50000 267931 38700
URAN CCPP MSPGCL THERMAL-GAS 67200 320330 30600
KOYANA MSPGCL HYDRO-HYDRO 195600 328155 13100
SMALL HYDRO POWER PLANTS MSPGCL HYDRO-HYDRO 45400 93062 30500
BHIRA MSPGCL HYDRO-HYDRO 8000 10046 8400
TILLARI MSPGCL HYDRO-HYDRO 8900 10584 3100
SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 233298 20500
SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 87633 20500
PRIVATE SECTOR
Page 36
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 81282 46750
JNSTPP(JAYPEE NIGRIE) JP POWER VENTURES LTD THERMAL-COAL 132000 726695 29310
MB POWER MB POWER THERMAL-COAL 120000 345632 38310
ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 754922 28671
ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 780761 23495
ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 198000 1263784 32090
ADANI POWER MAHARA ADANI POWER LTD THERMAL-COAL 330000 1666191 34124
AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 170065 36827
SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 252035 45129
ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 458551 36000
ESSAR POWER MP LTD ESSAR POWER MP LTD THERMAL-COAL 60000 243040 28600
VEDANTA LTD (P P -I) VEDANTA LTD THERMAL-GAS 3000 15044 24000
VEDANTA LTD (P P -II) VEDANTA LTD THERMAL-GAS 3000 21293 24000
PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 8234600 24000
165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 5850 64390
145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 68717 40349
SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 132655 28776
SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 144686 38567
MUNDRA UMPPCOASTAL GUJARAT POWER
LTD THERMAL-IMP COAL 400000 2530300
23900
LANCO AMARKANTAK TPP PATHADIH
U-ILANCO AMARKAN POWER LTD THERMAL-COAL 30000 195500
29200
LANCO AMARKANTAK TPP PATHADIH
U-IILANCO AMARKAN POWER LTD THERMAL-COAL 30000 206900
27600
BARADARHA TPS D B POWER LTD THERMAL-COAL 120000 677373 29200
JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 405000 28900
JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 453000 40500
DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 339437 40700
TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 293400 44000
TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 137200 37000
TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 174900 44000
BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 92900 14100
BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23700 34300
KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 27600 48300
CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2530300 23900
BHANDARDRA HEP -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 2475 54900
SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 161400 26500
SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 445000 39000
SOTHERN REGION
CENTRAL SECTOR
NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 325699 54820
NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 305532 39880
NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 998805 38510
NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 113016 54070
NEYVELI TAMILNADU POWER LTD JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 625274 42200
VALLUR TPS NTPC TECL THERMAL-COAL 150000 856438 42350
R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 1493 84300
RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1502919 29400
RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 341291 31800
SIMHADRI I NTPC LTD THERMAL-COAL 100000 688382 36800
SIMHADRI II NTPC LTD THERMAL-COAL 100000 663657 43400
KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 593110 31324
MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 291625 21764
KKNPP-1 amp 2 NPCIL NUCLEAR-NUCLEAR 200000 572609 40948
MINICOY LAKSHADEEP THERMAL-DIESEL 340 770 29600
KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1097 29600
AMINI LAKSHADEEP THERMAL-DIESEL 265 509 29600
ANDROTT LAKSHADEEP THERMAL-DIESEL 219 524 29600
KALPENI LAKSHADEEP THERMAL-DIESEL 175 356 29600
AGATTI LAKSHADEEP THERMAL-DIESEL 195 658 29600
KADMAT LAKSHADEEP THERMAL-DIESEL 190 414 29600
KILTAN LAKSHADEEP THERMAL-DIESEL 150 269 29600
CHETLET LAKSHADEEP THERMAL-DIESEL 100 139 29600
BITRA LAKSHADEEP THERMAL-DIESEL 043 024 29600
BANGARAM LAKSHADEEP THERMAL-DIESEL 018 009 29600
Page 37
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) STATE SECTOR
Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 721811 46500
Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 50000 336142 46500
RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 237358 46500
RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 239926 46500
RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 124500 46500
SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 62109 46500
UPPER SILERU APGENCO HYDRO-HYDRO 24000 33000 46500
LOWER SILERU APGENCO HYDRO-HYDRO 46000 81066 46500
DONKARAI APGENCO HYDRO-HYDRO 2500 6007 46500
PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 1262 46500
CHETTIPETA APGENCO HYDRO-HYDRO 100 214 46500
MUCHKUND APGENCO HYDRO-HYDRO 12000 37571 46500
NAGARJUNASAGAR RCPH APGENCO HYDRO-HYDRO 9000 606 46500
TUNGABHADRA HES amp HAMPI(AP
Share)
APGENCO HYDRO-HYDRO 7200 6100 46500
KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 352232 42600
KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 288131 32500
KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 319272 46500
RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 40073 44300
KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 308317 46000
KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 308963 51300
SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 61004 76600
NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 17960 75300
PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 20873 58300
POCHAMPAD-I TSPGENCO HYDRO-HYDRO 2700 5455 29800
POCHAMPAD-II TSPGENCO HYDRO-HYDRO 900 1932 40700
NIZAMSAGAR TSPGENCO HYDRO-HYDRO 1000 1126 53400
RAICHUR TPS 1 to 7 KPCL THERMAL-COAL 147000 890866 43800
RAICHUR TPS 8 KPCL THERMAL-COAL 25000 159523 48200
BELLARI TPS 1 KPCL THERMAL-COAL 50000 318679 51100
BELLARI TPS 2 KPCL THERMAL-COAL 50000 232347 55600
BELLARI TPS 3 KPCL THERMAL-COAL 70000 47565 34400
BHADRA PH KPCL HYDRO-HYDRO 3920 2369 45900
GERUSUPPA PH KPCL HYDRO-HYDRO 24000 26990 22000
GHAT PRABHA HEP KPCL HYDRO-HYDRO 3200 4777 25300
KADRA HPS KPCL HYDRO-HYDRO 15000 16889 26800
NAGJHARI KPCL HYDRO-HYDRO 90000 155159 9800
KODASALLI DPH KPCL HYDRO-HYDRO 12000 14854 19200
MUNIRA+MGH+SPH+SPH KPCL HYDRO-HYDRO 22640 48211 7900
SHARAVATHY HPS KPCL HYDRO-HYDRO 108550 276215 5400
ALMATTI DPH KPCL HYDRO-HYDRO 29000 39611 24600
VARAHI UGPH KPCL HYDRO-HYDRO 46000 71368 15600
IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 17196 15300
IDUKKI HPS KSEB HYDRO-HYDRO 78000 137905 15300
KAKKAD HPS KSEB HYDRO-HYDRO 5000 13063 15300
KALLADA HPS KSEB HYDRO-HYDRO 1500 4436 15300
KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 46544 15300
KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 635 15300
LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 30822 15300
MALANKARA HPS KSEB HYDRO-HYDRO 1050 2474 15300
MATTUPETTY KSEB HYDRO-HYDRO 200 230 15300
MALAMPUZHA KSEB HYDRO-HYDRO 250 063 15300
CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 864 15300
URUMI ST I amp II KSEB HYDRO-HYDRO 615 903 15300
LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 248 15300
NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7765 19625 15300
PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 16601 15300
PANNIAR HPS KSEB HYDRO-HYDRO 3240 6217 15300
PORINGALKUTHU KSEB HYDRO-HYDRO 3600 10052 15300
PORINGALKUTHU LBE KSEB HYDRO-HYDRO 1600 9438 15300
PEPPARA KSEB HYDRO-HYDRO 300 395 15300
POOZHITHODE KSEB HYDRO-HYDRO 480 1045 15300
Page 38
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) PEECHI KSEB HYDRO-HYDRO 125 040 15300
RANI-PERUNADU KSEB HYDRO-HYDRO 400 585 15300
SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 79783 15300
SENGULAM HPS KSEB HYDRO-HYDRO 5120 11558 15300
SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 16711 15300
VILANGAD KSEB HYDRO-HYDRO 750 1578 15300
BARAPOLE KSEB HYDRO-HYDRO 1500 1932 15300
VELLATHOOVAL KSEB HYDRO-HYDRO 360 305 15300
CHIM0NY KSEB HYDRO-HYDRO 250 156 15300
ADYANPARA KSEB HYDRO-HYDRO 350 501 15300
BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 554 15300
KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 3801 15300
KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 23132 32800
ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 14416 62280
METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 523970 62280
METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 321270 62280
NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 336575 62280
NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 591240 62280
TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 508966 62280
KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 30897 62280
VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 18720 90699 62280
KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 33593 62280
BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 1047 62280
PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 1250 62280
PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 330 62280
MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 4897 62280
MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 032 62280
KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15681 62280
KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 40608 62280
KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 21342 62280
KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 4717 62280
KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4322 62280
KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2399 62280
METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 4416 62280
METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 8035 62280
BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2187 62280
BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2359 62280
BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2511 62280
BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 1949 62280
BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 1819 62280
POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 172 62280
SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 241 62280
MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 026 62280
THIRUMOORTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 136 62280
PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 9309 62280
VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 353 62280
SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 4192 62280
PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 6571 62280
SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 1186 62280
SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6319 62280
ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 6122 62280
KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 28674 62280
SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 18381 62280
SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 4258 62280
KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 12680 62280
KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4201 62280
ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 000 62280
PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 19175 62280
AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 078 62280
BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 504 62280
BHAVANI KATTALAI (BKB)(IIIampIII BB I amp II)TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 5847 62280
PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 000 62280
Page 39
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) SRI DAMODARAM STPS APPDCL THERMAL-COAL 160000 808108 36300
PRIVATE SECTOR
KARUPPUR TANJORE LANCO TANJORE PCL THERMAL-GAS 12000 48096 28770
SIMHAPURI ENERGY LTD SIMHAPURI ENERGY LTD THERMAL-COAL 60000 143900 39100
JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 7111 45500
SBU 1 JSW ENERGY LTD
VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 26000 159100
43300
SBU 2 JSW ENERGY LTD
VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 60000 247900
42800
LANCO KPLLANCO KONDAPALLI POWER
LTDTHERMAL-GAS 36814 85060
25776
LANCO KPL STG -IILANCO KONDAPALLI POWER
LTDTHERMAL-GAS 36600 12979
46330
LANCO KPL STG -IIIALANCO KONDAPALLI POWER
LTDTHERMAL-GAS 37100 85710
46330
LANCO KPL STG -III BLANCO KONDAPALLI POWER
LTDTHERMAL-GAS 37100 43639
46330
HINDUJA NATIONAL PCL HINDUJA NATIONAL PCL THERMAL-COAL 104000 303000 38200
MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 121164 49940
UDUPI POWER COR LTD ADANI POWER LTD THERMAL-COAL 120000 754613 42500
SPECTRUM POWER GENERATION
LTD SPECTRUM PG LTD THERMAL-GASN 20525 9256812
34952
TAQA NEYVELI POWER COM PVT
LTD TAQA NEYVELI THERMAL-LIG 25000 5840
34500
ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 251000 51000
ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 207860 36800
GMR VEMAGIRI POWER GENERATION
LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 30117
46450
EASTERN REGION
CENTRAL SECTOR
MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 64675 53113
MTPS STAGE - II KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 39000 1432 69138
BOKARO `B` TPS DVC THERMAL-COAL 63000 145670 31539
MEJIA TPS U 1-3 DVC THERMAL-COAL 63000 348298 31552
MEJIA TPS U 4 DVC THERMAL-COAL 21000 116099 34997
MEJIA TPS U 5-6 DVC THERMAL-COAL 50000 276427 35976
MEJIA TPS U 7-8 DVC THERMAL-COAL 100000 552854 36991
DURGAPUR STEEL TPS DVC THERMAL-COAL 100000 665550 39323
DURGAPUR TPS DVC THERMAL-COAL 21000 59270 35416
RAGHUNATHPUR TPS DVC THERMAL-COAL 120000 201650 35326
MAITHON HYDEL STA DVC HYDRO-HYDRO 6320 12200 17984
CHANDRAPURA TPSU1-3 DVC THERMAL-COAL 42000 257610 35095
CHANDRAPURA TPSU7-8 DVC THERMAL-COAL 50000 306673 34987
KODERMA TPS DVC THERMAL-COAL 100000 380180 38131
PANCHET HPS DVC HYDRO-HYDRO 8000 13360 17984
TILLAYA HPS DVC HYDRO-HYDRO 400 1410 17984
RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34700 35400
TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 277300 23200
TLDP -III NHPC LTD HYDRO-HYDRO 13200 55400 62000
TLDP -IV NHPC LTD HYDRO-HYDRO 16000 60300 25600
FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 957219 33700
FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 308943 41000
BONGAINGAON TPS NTPC LTD THERMAL-COAL 25000 153663 58600
KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 542277 34200
KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 942591 34200
BARH-II NTPC LTD THERMAL-COAL 132000 728021 44500
TALCHER TPS NTPC LTD THERMAL-COAL 46000 335521 30100
TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 702319 25600
TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1436521 24700
STATE SECTOR
BTPS(RampM) BIHAR STATE PGCL THERMAL-COAL 22000 12142 39700
BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 98331 10602
HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 50593 9482
CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 19689 2605
RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 53192 6033
UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 147208 14637
Page 40
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 60353 4519
IB TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 288567 25000
J P H GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 210 038 61100
MEYONG CHU GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 400 1086 61100
TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 122667 38200
DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 214339 43321
KOLAGHAT THERMAL POWER
STATION
WEST BENGAL PDCL THERMAL-COAL 126000 538269 31603
BAKRESHWAR THERMAL POWER
PLANT
WEST BENGAL PDCL THERMAL-COAL 105000 634876 32154
BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 45000 166855 33299
SANTHALDIH THERMAL POWER
STATION
WEST BENGAL PDCL THERMAL-COAL 50000 336442 34932
SAGARDIGHI THERMAL POWER
PROJECT
WEST BENGAL PDCL THERMAL-COAL 160000 423121 34705
JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 20344 68900
RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 24559 68900
TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 4623 68900
PURULIA PUMPED STORAGE
PROJECT
WEST BENGAL SEDCL HYDRO-HYDRO 90000 108816 68900
MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2768 68900
PRIVATE SECTOR
CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 49474 20230
CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 555500 70200
HALDIA ENERGY HALDIA ENERGY LTD THERMAL-COAL 60000 371000 50400
DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3688 63400
KAMALANGA TPS GMR KAMALANGA ENERGY LTD THERMAL-COAL 105000547670
33300
ADHUNIK POWER U-1 ADHUNIK POWER THERMAL-COAL 27000 158 44060
ADHUNIK POWER U-2 ADHUNIK POWER THERMAL-COAL 27000 168 44250
VL-JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 332800 23622
JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 43000 45250
JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 71700 37030
JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 70700 35920
JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 71100 38870
JOJOBERA UNIT 5 TATA POWER COM LTD THERMAL-COAL 12000 79300 44560
JOJOBERA UNIT 6 TATA POWER COM LTD THERMAL-WHR 12000 83700 12840
IEL KALINGANAGAR U-I TATA POWER COM LTD THERMAL-WG 6750 33400 22500
IEL KALINGANAGAR U-II TATA POWER COM LTD THERMAL-WG 6750 34800 22500
MAITHON UNIT 1 amp 2 TATA POWER COM LTD THERMAL-COAL 105000 678000 36100
HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 27500 24340
HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 28400 24340
HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 15800 24310
NORTH EASTERN REGION
CENTRAL SECTOR
LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 74100 36600
AGARTALA GT NEEPCO THERMAL-GAS 13500 88611 27210
ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 153111 32310
DOYANG HEP NEEPCO HYDRO-HYDRO 7500 25598 49801
KOPILI HEP NEEPCO HYDRO-HYDRO 20000 98186 11491
KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 19582 20237
KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 10310 17968
RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 124093 22945
TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 10100 17344 39000
STATE SECTOR
HYDRO POWER (122 Stns) ITANAGAR GOVT OF ARUNACHAL
PRADESHHYDRO-HYDRO 6971 6217270
24600
KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39514 17337
LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 82327 36810
NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 33318 48290
MYNTRIANG SHEP ST II ASSAM POWER GENCO HYDRO-HYDRO 300 567 35776
LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 9130 49200
LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 012 49200
DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 022 49200
TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 000 49200
UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 4990 16000
UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 6476 37000
UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 16494 14600
UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 3600 9556 15000
SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 758 8000
MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44070 44800
KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 154 41400
TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 091 41400
MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 411 41400
MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 394 41400
KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 760 41400
SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 3264 41400
LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 044 41400
BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 18953 28000
ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 43585 28200
GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 4080 11100
Note
LIG Lignite N Naptha WHR Waste Heat Recovery
Page 41
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 81282 46750
JNSTPP(JAYPEE NIGRIE) JP POWER VENTURES LTD THERMAL-COAL 132000 726695 29310
MB POWER MB POWER THERMAL-COAL 120000 345632 38310
ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 754922 28671
ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 780761 23495
ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 198000 1263784 32090
ADANI POWER MAHARA ADANI POWER LTD THERMAL-COAL 330000 1666191 34124
AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 170065 36827
SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 252035 45129
ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 458551 36000
ESSAR POWER MP LTD ESSAR POWER MP LTD THERMAL-COAL 60000 243040 28600
VEDANTA LTD (P P -I) VEDANTA LTD THERMAL-GAS 3000 15044 24000
VEDANTA LTD (P P -II) VEDANTA LTD THERMAL-GAS 3000 21293 24000
PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 8234600 24000
165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 5850 64390
145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 68717 40349
SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 132655 28776
SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 144686 38567
MUNDRA UMPPCOASTAL GUJARAT POWER
LTD THERMAL-IMP COAL 400000 2530300
23900
LANCO AMARKANTAK TPP PATHADIH
U-ILANCO AMARKAN POWER LTD THERMAL-COAL 30000 195500
29200
LANCO AMARKANTAK TPP PATHADIH
U-IILANCO AMARKAN POWER LTD THERMAL-COAL 30000 206900
27600
BARADARHA TPS D B POWER LTD THERMAL-COAL 120000 677373 29200
JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 405000 28900
JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 453000 40500
DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 339437 40700
TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 293400 44000
TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 137200 37000
TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 174900 44000
BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 92900 14100
BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23700 34300
KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 27600 48300
CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2530300 23900
BHANDARDRA HEP -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 2475 54900
SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 161400 26500
SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 445000 39000
SOTHERN REGION
CENTRAL SECTOR
NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 325699 54820
NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 305532 39880
NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 998805 38510
NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 113016 54070
NEYVELI TAMILNADU POWER LTD JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 625274 42200
VALLUR TPS NTPC TECL THERMAL-COAL 150000 856438 42350
R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 1493 84300
RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1502919 29400
RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 341291 31800
SIMHADRI I NTPC LTD THERMAL-COAL 100000 688382 36800
SIMHADRI II NTPC LTD THERMAL-COAL 100000 663657 43400
KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 593110 31324
MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 291625 21764
KKNPP-1 amp 2 NPCIL NUCLEAR-NUCLEAR 200000 572609 40948
MINICOY LAKSHADEEP THERMAL-DIESEL 340 770 29600
KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1097 29600
AMINI LAKSHADEEP THERMAL-DIESEL 265 509 29600
ANDROTT LAKSHADEEP THERMAL-DIESEL 219 524 29600
KALPENI LAKSHADEEP THERMAL-DIESEL 175 356 29600
AGATTI LAKSHADEEP THERMAL-DIESEL 195 658 29600
KADMAT LAKSHADEEP THERMAL-DIESEL 190 414 29600
KILTAN LAKSHADEEP THERMAL-DIESEL 150 269 29600
CHETLET LAKSHADEEP THERMAL-DIESEL 100 139 29600
BITRA LAKSHADEEP THERMAL-DIESEL 043 024 29600
BANGARAM LAKSHADEEP THERMAL-DIESEL 018 009 29600
Page 37
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) STATE SECTOR
Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 721811 46500
Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 50000 336142 46500
RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 237358 46500
RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 239926 46500
RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 124500 46500
SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 62109 46500
UPPER SILERU APGENCO HYDRO-HYDRO 24000 33000 46500
LOWER SILERU APGENCO HYDRO-HYDRO 46000 81066 46500
DONKARAI APGENCO HYDRO-HYDRO 2500 6007 46500
PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 1262 46500
CHETTIPETA APGENCO HYDRO-HYDRO 100 214 46500
MUCHKUND APGENCO HYDRO-HYDRO 12000 37571 46500
NAGARJUNASAGAR RCPH APGENCO HYDRO-HYDRO 9000 606 46500
TUNGABHADRA HES amp HAMPI(AP
Share)
APGENCO HYDRO-HYDRO 7200 6100 46500
KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 352232 42600
KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 288131 32500
KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 319272 46500
RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 40073 44300
KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 308317 46000
KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 308963 51300
SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 61004 76600
NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 17960 75300
PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 20873 58300
POCHAMPAD-I TSPGENCO HYDRO-HYDRO 2700 5455 29800
POCHAMPAD-II TSPGENCO HYDRO-HYDRO 900 1932 40700
NIZAMSAGAR TSPGENCO HYDRO-HYDRO 1000 1126 53400
RAICHUR TPS 1 to 7 KPCL THERMAL-COAL 147000 890866 43800
RAICHUR TPS 8 KPCL THERMAL-COAL 25000 159523 48200
BELLARI TPS 1 KPCL THERMAL-COAL 50000 318679 51100
BELLARI TPS 2 KPCL THERMAL-COAL 50000 232347 55600
BELLARI TPS 3 KPCL THERMAL-COAL 70000 47565 34400
BHADRA PH KPCL HYDRO-HYDRO 3920 2369 45900
GERUSUPPA PH KPCL HYDRO-HYDRO 24000 26990 22000
GHAT PRABHA HEP KPCL HYDRO-HYDRO 3200 4777 25300
KADRA HPS KPCL HYDRO-HYDRO 15000 16889 26800
NAGJHARI KPCL HYDRO-HYDRO 90000 155159 9800
KODASALLI DPH KPCL HYDRO-HYDRO 12000 14854 19200
MUNIRA+MGH+SPH+SPH KPCL HYDRO-HYDRO 22640 48211 7900
SHARAVATHY HPS KPCL HYDRO-HYDRO 108550 276215 5400
ALMATTI DPH KPCL HYDRO-HYDRO 29000 39611 24600
VARAHI UGPH KPCL HYDRO-HYDRO 46000 71368 15600
IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 17196 15300
IDUKKI HPS KSEB HYDRO-HYDRO 78000 137905 15300
KAKKAD HPS KSEB HYDRO-HYDRO 5000 13063 15300
KALLADA HPS KSEB HYDRO-HYDRO 1500 4436 15300
KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 46544 15300
KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 635 15300
LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 30822 15300
MALANKARA HPS KSEB HYDRO-HYDRO 1050 2474 15300
MATTUPETTY KSEB HYDRO-HYDRO 200 230 15300
MALAMPUZHA KSEB HYDRO-HYDRO 250 063 15300
CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 864 15300
URUMI ST I amp II KSEB HYDRO-HYDRO 615 903 15300
LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 248 15300
NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7765 19625 15300
PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 16601 15300
PANNIAR HPS KSEB HYDRO-HYDRO 3240 6217 15300
PORINGALKUTHU KSEB HYDRO-HYDRO 3600 10052 15300
PORINGALKUTHU LBE KSEB HYDRO-HYDRO 1600 9438 15300
PEPPARA KSEB HYDRO-HYDRO 300 395 15300
POOZHITHODE KSEB HYDRO-HYDRO 480 1045 15300
Page 38
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) PEECHI KSEB HYDRO-HYDRO 125 040 15300
RANI-PERUNADU KSEB HYDRO-HYDRO 400 585 15300
SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 79783 15300
SENGULAM HPS KSEB HYDRO-HYDRO 5120 11558 15300
SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 16711 15300
VILANGAD KSEB HYDRO-HYDRO 750 1578 15300
BARAPOLE KSEB HYDRO-HYDRO 1500 1932 15300
VELLATHOOVAL KSEB HYDRO-HYDRO 360 305 15300
CHIM0NY KSEB HYDRO-HYDRO 250 156 15300
ADYANPARA KSEB HYDRO-HYDRO 350 501 15300
BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 554 15300
KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 3801 15300
KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 23132 32800
ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 14416 62280
METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 523970 62280
METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 321270 62280
NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 336575 62280
NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 591240 62280
TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 508966 62280
KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 30897 62280
VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 18720 90699 62280
KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 33593 62280
BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 1047 62280
PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 1250 62280
PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 330 62280
MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 4897 62280
MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 032 62280
KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15681 62280
KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 40608 62280
KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 21342 62280
KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 4717 62280
KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4322 62280
KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2399 62280
METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 4416 62280
METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 8035 62280
BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2187 62280
BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2359 62280
BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2511 62280
BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 1949 62280
BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 1819 62280
POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 172 62280
SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 241 62280
MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 026 62280
THIRUMOORTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 136 62280
PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 9309 62280
VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 353 62280
SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 4192 62280
PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 6571 62280
SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 1186 62280
SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6319 62280
ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 6122 62280
KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 28674 62280
SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 18381 62280
SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 4258 62280
KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 12680 62280
KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4201 62280
ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 000 62280
PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 19175 62280
AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 078 62280
BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 504 62280
BHAVANI KATTALAI (BKB)(IIIampIII BB I amp II)TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 5847 62280
PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 000 62280
Page 39
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) SRI DAMODARAM STPS APPDCL THERMAL-COAL 160000 808108 36300
PRIVATE SECTOR
KARUPPUR TANJORE LANCO TANJORE PCL THERMAL-GAS 12000 48096 28770
SIMHAPURI ENERGY LTD SIMHAPURI ENERGY LTD THERMAL-COAL 60000 143900 39100
JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 7111 45500
SBU 1 JSW ENERGY LTD
VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 26000 159100
43300
SBU 2 JSW ENERGY LTD
VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 60000 247900
42800
LANCO KPLLANCO KONDAPALLI POWER
LTDTHERMAL-GAS 36814 85060
25776
LANCO KPL STG -IILANCO KONDAPALLI POWER
LTDTHERMAL-GAS 36600 12979
46330
LANCO KPL STG -IIIALANCO KONDAPALLI POWER
LTDTHERMAL-GAS 37100 85710
46330
LANCO KPL STG -III BLANCO KONDAPALLI POWER
LTDTHERMAL-GAS 37100 43639
46330
HINDUJA NATIONAL PCL HINDUJA NATIONAL PCL THERMAL-COAL 104000 303000 38200
MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 121164 49940
UDUPI POWER COR LTD ADANI POWER LTD THERMAL-COAL 120000 754613 42500
SPECTRUM POWER GENERATION
LTD SPECTRUM PG LTD THERMAL-GASN 20525 9256812
34952
TAQA NEYVELI POWER COM PVT
LTD TAQA NEYVELI THERMAL-LIG 25000 5840
34500
ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 251000 51000
ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 207860 36800
GMR VEMAGIRI POWER GENERATION
LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 30117
46450
EASTERN REGION
CENTRAL SECTOR
MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 64675 53113
MTPS STAGE - II KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 39000 1432 69138
BOKARO `B` TPS DVC THERMAL-COAL 63000 145670 31539
MEJIA TPS U 1-3 DVC THERMAL-COAL 63000 348298 31552
MEJIA TPS U 4 DVC THERMAL-COAL 21000 116099 34997
MEJIA TPS U 5-6 DVC THERMAL-COAL 50000 276427 35976
MEJIA TPS U 7-8 DVC THERMAL-COAL 100000 552854 36991
DURGAPUR STEEL TPS DVC THERMAL-COAL 100000 665550 39323
DURGAPUR TPS DVC THERMAL-COAL 21000 59270 35416
RAGHUNATHPUR TPS DVC THERMAL-COAL 120000 201650 35326
MAITHON HYDEL STA DVC HYDRO-HYDRO 6320 12200 17984
CHANDRAPURA TPSU1-3 DVC THERMAL-COAL 42000 257610 35095
CHANDRAPURA TPSU7-8 DVC THERMAL-COAL 50000 306673 34987
KODERMA TPS DVC THERMAL-COAL 100000 380180 38131
PANCHET HPS DVC HYDRO-HYDRO 8000 13360 17984
TILLAYA HPS DVC HYDRO-HYDRO 400 1410 17984
RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34700 35400
TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 277300 23200
TLDP -III NHPC LTD HYDRO-HYDRO 13200 55400 62000
TLDP -IV NHPC LTD HYDRO-HYDRO 16000 60300 25600
FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 957219 33700
FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 308943 41000
BONGAINGAON TPS NTPC LTD THERMAL-COAL 25000 153663 58600
KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 542277 34200
KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 942591 34200
BARH-II NTPC LTD THERMAL-COAL 132000 728021 44500
TALCHER TPS NTPC LTD THERMAL-COAL 46000 335521 30100
TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 702319 25600
TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1436521 24700
STATE SECTOR
BTPS(RampM) BIHAR STATE PGCL THERMAL-COAL 22000 12142 39700
BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 98331 10602
HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 50593 9482
CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 19689 2605
RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 53192 6033
UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 147208 14637
Page 40
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 60353 4519
IB TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 288567 25000
J P H GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 210 038 61100
MEYONG CHU GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 400 1086 61100
TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 122667 38200
DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 214339 43321
KOLAGHAT THERMAL POWER
STATION
WEST BENGAL PDCL THERMAL-COAL 126000 538269 31603
BAKRESHWAR THERMAL POWER
PLANT
WEST BENGAL PDCL THERMAL-COAL 105000 634876 32154
BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 45000 166855 33299
SANTHALDIH THERMAL POWER
STATION
WEST BENGAL PDCL THERMAL-COAL 50000 336442 34932
SAGARDIGHI THERMAL POWER
PROJECT
WEST BENGAL PDCL THERMAL-COAL 160000 423121 34705
JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 20344 68900
RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 24559 68900
TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 4623 68900
PURULIA PUMPED STORAGE
PROJECT
WEST BENGAL SEDCL HYDRO-HYDRO 90000 108816 68900
MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2768 68900
PRIVATE SECTOR
CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 49474 20230
CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 555500 70200
HALDIA ENERGY HALDIA ENERGY LTD THERMAL-COAL 60000 371000 50400
DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3688 63400
KAMALANGA TPS GMR KAMALANGA ENERGY LTD THERMAL-COAL 105000547670
33300
ADHUNIK POWER U-1 ADHUNIK POWER THERMAL-COAL 27000 158 44060
ADHUNIK POWER U-2 ADHUNIK POWER THERMAL-COAL 27000 168 44250
VL-JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 332800 23622
JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 43000 45250
JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 71700 37030
JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 70700 35920
JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 71100 38870
JOJOBERA UNIT 5 TATA POWER COM LTD THERMAL-COAL 12000 79300 44560
JOJOBERA UNIT 6 TATA POWER COM LTD THERMAL-WHR 12000 83700 12840
IEL KALINGANAGAR U-I TATA POWER COM LTD THERMAL-WG 6750 33400 22500
IEL KALINGANAGAR U-II TATA POWER COM LTD THERMAL-WG 6750 34800 22500
MAITHON UNIT 1 amp 2 TATA POWER COM LTD THERMAL-COAL 105000 678000 36100
HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 27500 24340
HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 28400 24340
HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 15800 24310
NORTH EASTERN REGION
CENTRAL SECTOR
LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 74100 36600
AGARTALA GT NEEPCO THERMAL-GAS 13500 88611 27210
ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 153111 32310
DOYANG HEP NEEPCO HYDRO-HYDRO 7500 25598 49801
KOPILI HEP NEEPCO HYDRO-HYDRO 20000 98186 11491
KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 19582 20237
KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 10310 17968
RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 124093 22945
TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 10100 17344 39000
STATE SECTOR
HYDRO POWER (122 Stns) ITANAGAR GOVT OF ARUNACHAL
PRADESHHYDRO-HYDRO 6971 6217270
24600
KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39514 17337
LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 82327 36810
NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 33318 48290
MYNTRIANG SHEP ST II ASSAM POWER GENCO HYDRO-HYDRO 300 567 35776
LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 9130 49200
LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 012 49200
DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 022 49200
TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 000 49200
UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 4990 16000
UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 6476 37000
UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 16494 14600
UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 3600 9556 15000
SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 758 8000
MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44070 44800
KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 154 41400
TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 091 41400
MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 411 41400
MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 394 41400
KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 760 41400
SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 3264 41400
LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 044 41400
BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 18953 28000
ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 43585 28200
GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 4080 11100
Note
LIG Lignite N Naptha WHR Waste Heat Recovery
Page 41
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) STATE SECTOR
Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 721811 46500
Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 50000 336142 46500
RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 237358 46500
RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 239926 46500
RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 124500 46500
SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 62109 46500
UPPER SILERU APGENCO HYDRO-HYDRO 24000 33000 46500
LOWER SILERU APGENCO HYDRO-HYDRO 46000 81066 46500
DONKARAI APGENCO HYDRO-HYDRO 2500 6007 46500
PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 1262 46500
CHETTIPETA APGENCO HYDRO-HYDRO 100 214 46500
MUCHKUND APGENCO HYDRO-HYDRO 12000 37571 46500
NAGARJUNASAGAR RCPH APGENCO HYDRO-HYDRO 9000 606 46500
TUNGABHADRA HES amp HAMPI(AP
Share)
APGENCO HYDRO-HYDRO 7200 6100 46500
KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 352232 42600
KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 288131 32500
KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 319272 46500
RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 40073 44300
KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 308317 46000
KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 308963 51300
SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 61004 76600
NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 17960 75300
PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 20873 58300
POCHAMPAD-I TSPGENCO HYDRO-HYDRO 2700 5455 29800
POCHAMPAD-II TSPGENCO HYDRO-HYDRO 900 1932 40700
NIZAMSAGAR TSPGENCO HYDRO-HYDRO 1000 1126 53400
RAICHUR TPS 1 to 7 KPCL THERMAL-COAL 147000 890866 43800
RAICHUR TPS 8 KPCL THERMAL-COAL 25000 159523 48200
BELLARI TPS 1 KPCL THERMAL-COAL 50000 318679 51100
BELLARI TPS 2 KPCL THERMAL-COAL 50000 232347 55600
BELLARI TPS 3 KPCL THERMAL-COAL 70000 47565 34400
BHADRA PH KPCL HYDRO-HYDRO 3920 2369 45900
GERUSUPPA PH KPCL HYDRO-HYDRO 24000 26990 22000
GHAT PRABHA HEP KPCL HYDRO-HYDRO 3200 4777 25300
KADRA HPS KPCL HYDRO-HYDRO 15000 16889 26800
NAGJHARI KPCL HYDRO-HYDRO 90000 155159 9800
KODASALLI DPH KPCL HYDRO-HYDRO 12000 14854 19200
MUNIRA+MGH+SPH+SPH KPCL HYDRO-HYDRO 22640 48211 7900
SHARAVATHY HPS KPCL HYDRO-HYDRO 108550 276215 5400
ALMATTI DPH KPCL HYDRO-HYDRO 29000 39611 24600
VARAHI UGPH KPCL HYDRO-HYDRO 46000 71368 15600
IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 17196 15300
IDUKKI HPS KSEB HYDRO-HYDRO 78000 137905 15300
KAKKAD HPS KSEB HYDRO-HYDRO 5000 13063 15300
KALLADA HPS KSEB HYDRO-HYDRO 1500 4436 15300
KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 46544 15300
KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 635 15300
LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 30822 15300
MALANKARA HPS KSEB HYDRO-HYDRO 1050 2474 15300
MATTUPETTY KSEB HYDRO-HYDRO 200 230 15300
MALAMPUZHA KSEB HYDRO-HYDRO 250 063 15300
CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 864 15300
URUMI ST I amp II KSEB HYDRO-HYDRO 615 903 15300
LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 248 15300
NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7765 19625 15300
PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 16601 15300
PANNIAR HPS KSEB HYDRO-HYDRO 3240 6217 15300
PORINGALKUTHU KSEB HYDRO-HYDRO 3600 10052 15300
PORINGALKUTHU LBE KSEB HYDRO-HYDRO 1600 9438 15300
PEPPARA KSEB HYDRO-HYDRO 300 395 15300
POOZHITHODE KSEB HYDRO-HYDRO 480 1045 15300
Page 38
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) PEECHI KSEB HYDRO-HYDRO 125 040 15300
RANI-PERUNADU KSEB HYDRO-HYDRO 400 585 15300
SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 79783 15300
SENGULAM HPS KSEB HYDRO-HYDRO 5120 11558 15300
SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 16711 15300
VILANGAD KSEB HYDRO-HYDRO 750 1578 15300
BARAPOLE KSEB HYDRO-HYDRO 1500 1932 15300
VELLATHOOVAL KSEB HYDRO-HYDRO 360 305 15300
CHIM0NY KSEB HYDRO-HYDRO 250 156 15300
ADYANPARA KSEB HYDRO-HYDRO 350 501 15300
BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 554 15300
KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 3801 15300
KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 23132 32800
ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 14416 62280
METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 523970 62280
METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 321270 62280
NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 336575 62280
NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 591240 62280
TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 508966 62280
KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 30897 62280
VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 18720 90699 62280
KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 33593 62280
BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 1047 62280
PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 1250 62280
PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 330 62280
MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 4897 62280
MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 032 62280
KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15681 62280
KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 40608 62280
KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 21342 62280
KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 4717 62280
KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4322 62280
KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2399 62280
METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 4416 62280
METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 8035 62280
BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2187 62280
BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2359 62280
BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2511 62280
BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 1949 62280
BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 1819 62280
POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 172 62280
SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 241 62280
MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 026 62280
THIRUMOORTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 136 62280
PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 9309 62280
VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 353 62280
SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 4192 62280
PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 6571 62280
SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 1186 62280
SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6319 62280
ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 6122 62280
KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 28674 62280
SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 18381 62280
SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 4258 62280
KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 12680 62280
KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4201 62280
ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 000 62280
PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 19175 62280
AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 078 62280
BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 504 62280
BHAVANI KATTALAI (BKB)(IIIampIII BB I amp II)TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 5847 62280
PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 000 62280
Page 39
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) SRI DAMODARAM STPS APPDCL THERMAL-COAL 160000 808108 36300
PRIVATE SECTOR
KARUPPUR TANJORE LANCO TANJORE PCL THERMAL-GAS 12000 48096 28770
SIMHAPURI ENERGY LTD SIMHAPURI ENERGY LTD THERMAL-COAL 60000 143900 39100
JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 7111 45500
SBU 1 JSW ENERGY LTD
VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 26000 159100
43300
SBU 2 JSW ENERGY LTD
VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 60000 247900
42800
LANCO KPLLANCO KONDAPALLI POWER
LTDTHERMAL-GAS 36814 85060
25776
LANCO KPL STG -IILANCO KONDAPALLI POWER
LTDTHERMAL-GAS 36600 12979
46330
LANCO KPL STG -IIIALANCO KONDAPALLI POWER
LTDTHERMAL-GAS 37100 85710
46330
LANCO KPL STG -III BLANCO KONDAPALLI POWER
LTDTHERMAL-GAS 37100 43639
46330
HINDUJA NATIONAL PCL HINDUJA NATIONAL PCL THERMAL-COAL 104000 303000 38200
MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 121164 49940
UDUPI POWER COR LTD ADANI POWER LTD THERMAL-COAL 120000 754613 42500
SPECTRUM POWER GENERATION
LTD SPECTRUM PG LTD THERMAL-GASN 20525 9256812
34952
TAQA NEYVELI POWER COM PVT
LTD TAQA NEYVELI THERMAL-LIG 25000 5840
34500
ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 251000 51000
ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 207860 36800
GMR VEMAGIRI POWER GENERATION
LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 30117
46450
EASTERN REGION
CENTRAL SECTOR
MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 64675 53113
MTPS STAGE - II KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 39000 1432 69138
BOKARO `B` TPS DVC THERMAL-COAL 63000 145670 31539
MEJIA TPS U 1-3 DVC THERMAL-COAL 63000 348298 31552
MEJIA TPS U 4 DVC THERMAL-COAL 21000 116099 34997
MEJIA TPS U 5-6 DVC THERMAL-COAL 50000 276427 35976
MEJIA TPS U 7-8 DVC THERMAL-COAL 100000 552854 36991
DURGAPUR STEEL TPS DVC THERMAL-COAL 100000 665550 39323
DURGAPUR TPS DVC THERMAL-COAL 21000 59270 35416
RAGHUNATHPUR TPS DVC THERMAL-COAL 120000 201650 35326
MAITHON HYDEL STA DVC HYDRO-HYDRO 6320 12200 17984
CHANDRAPURA TPSU1-3 DVC THERMAL-COAL 42000 257610 35095
CHANDRAPURA TPSU7-8 DVC THERMAL-COAL 50000 306673 34987
KODERMA TPS DVC THERMAL-COAL 100000 380180 38131
PANCHET HPS DVC HYDRO-HYDRO 8000 13360 17984
TILLAYA HPS DVC HYDRO-HYDRO 400 1410 17984
RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34700 35400
TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 277300 23200
TLDP -III NHPC LTD HYDRO-HYDRO 13200 55400 62000
TLDP -IV NHPC LTD HYDRO-HYDRO 16000 60300 25600
FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 957219 33700
FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 308943 41000
BONGAINGAON TPS NTPC LTD THERMAL-COAL 25000 153663 58600
KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 542277 34200
KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 942591 34200
BARH-II NTPC LTD THERMAL-COAL 132000 728021 44500
TALCHER TPS NTPC LTD THERMAL-COAL 46000 335521 30100
TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 702319 25600
TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1436521 24700
STATE SECTOR
BTPS(RampM) BIHAR STATE PGCL THERMAL-COAL 22000 12142 39700
BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 98331 10602
HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 50593 9482
CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 19689 2605
RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 53192 6033
UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 147208 14637
Page 40
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 60353 4519
IB TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 288567 25000
J P H GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 210 038 61100
MEYONG CHU GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 400 1086 61100
TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 122667 38200
DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 214339 43321
KOLAGHAT THERMAL POWER
STATION
WEST BENGAL PDCL THERMAL-COAL 126000 538269 31603
BAKRESHWAR THERMAL POWER
PLANT
WEST BENGAL PDCL THERMAL-COAL 105000 634876 32154
BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 45000 166855 33299
SANTHALDIH THERMAL POWER
STATION
WEST BENGAL PDCL THERMAL-COAL 50000 336442 34932
SAGARDIGHI THERMAL POWER
PROJECT
WEST BENGAL PDCL THERMAL-COAL 160000 423121 34705
JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 20344 68900
RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 24559 68900
TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 4623 68900
PURULIA PUMPED STORAGE
PROJECT
WEST BENGAL SEDCL HYDRO-HYDRO 90000 108816 68900
MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2768 68900
PRIVATE SECTOR
CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 49474 20230
CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 555500 70200
HALDIA ENERGY HALDIA ENERGY LTD THERMAL-COAL 60000 371000 50400
DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3688 63400
KAMALANGA TPS GMR KAMALANGA ENERGY LTD THERMAL-COAL 105000547670
33300
ADHUNIK POWER U-1 ADHUNIK POWER THERMAL-COAL 27000 158 44060
ADHUNIK POWER U-2 ADHUNIK POWER THERMAL-COAL 27000 168 44250
VL-JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 332800 23622
JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 43000 45250
JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 71700 37030
JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 70700 35920
JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 71100 38870
JOJOBERA UNIT 5 TATA POWER COM LTD THERMAL-COAL 12000 79300 44560
JOJOBERA UNIT 6 TATA POWER COM LTD THERMAL-WHR 12000 83700 12840
IEL KALINGANAGAR U-I TATA POWER COM LTD THERMAL-WG 6750 33400 22500
IEL KALINGANAGAR U-II TATA POWER COM LTD THERMAL-WG 6750 34800 22500
MAITHON UNIT 1 amp 2 TATA POWER COM LTD THERMAL-COAL 105000 678000 36100
HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 27500 24340
HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 28400 24340
HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 15800 24310
NORTH EASTERN REGION
CENTRAL SECTOR
LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 74100 36600
AGARTALA GT NEEPCO THERMAL-GAS 13500 88611 27210
ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 153111 32310
DOYANG HEP NEEPCO HYDRO-HYDRO 7500 25598 49801
KOPILI HEP NEEPCO HYDRO-HYDRO 20000 98186 11491
KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 19582 20237
KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 10310 17968
RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 124093 22945
TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 10100 17344 39000
STATE SECTOR
HYDRO POWER (122 Stns) ITANAGAR GOVT OF ARUNACHAL
PRADESHHYDRO-HYDRO 6971 6217270
24600
KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39514 17337
LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 82327 36810
NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 33318 48290
MYNTRIANG SHEP ST II ASSAM POWER GENCO HYDRO-HYDRO 300 567 35776
LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 9130 49200
LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 012 49200
DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 022 49200
TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 000 49200
UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 4990 16000
UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 6476 37000
UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 16494 14600
UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 3600 9556 15000
SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 758 8000
MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44070 44800
KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 154 41400
TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 091 41400
MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 411 41400
MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 394 41400
KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 760 41400
SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 3264 41400
LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 044 41400
BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 18953 28000
ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 43585 28200
GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 4080 11100
Note
LIG Lignite N Naptha WHR Waste Heat Recovery
Page 41
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) PEECHI KSEB HYDRO-HYDRO 125 040 15300
RANI-PERUNADU KSEB HYDRO-HYDRO 400 585 15300
SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 79783 15300
SENGULAM HPS KSEB HYDRO-HYDRO 5120 11558 15300
SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 16711 15300
VILANGAD KSEB HYDRO-HYDRO 750 1578 15300
BARAPOLE KSEB HYDRO-HYDRO 1500 1932 15300
VELLATHOOVAL KSEB HYDRO-HYDRO 360 305 15300
CHIM0NY KSEB HYDRO-HYDRO 250 156 15300
ADYANPARA KSEB HYDRO-HYDRO 350 501 15300
BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 554 15300
KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 3801 15300
KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 23132 32800
ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 14416 62280
METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 523970 62280
METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 321270 62280
NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 336575 62280
NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 591240 62280
TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 508966 62280
KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 30897 62280
VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 18720 90699 62280
KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 33593 62280
BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 1047 62280
PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 1250 62280
PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 330 62280
MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 4897 62280
MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 032 62280
KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15681 62280
KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 40608 62280
KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 21342 62280
KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 4717 62280
KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4322 62280
KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2399 62280
METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 4416 62280
METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 8035 62280
BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2187 62280
BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2359 62280
BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2511 62280
BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 1949 62280
BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 1819 62280
POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 172 62280
SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 241 62280
MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 026 62280
THIRUMOORTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 136 62280
PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 9309 62280
VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 353 62280
SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 4192 62280
PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 6571 62280
SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 1186 62280
SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6319 62280
ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 6122 62280
KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 28674 62280
SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 18381 62280
SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 4258 62280
KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 12680 62280
KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4201 62280
ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 000 62280
PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 19175 62280
AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 078 62280
BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 504 62280
BHAVANI KATTALAI (BKB)(IIIampIII BB I amp II)TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 5847 62280
PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 000 62280
Page 39
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) SRI DAMODARAM STPS APPDCL THERMAL-COAL 160000 808108 36300
PRIVATE SECTOR
KARUPPUR TANJORE LANCO TANJORE PCL THERMAL-GAS 12000 48096 28770
SIMHAPURI ENERGY LTD SIMHAPURI ENERGY LTD THERMAL-COAL 60000 143900 39100
JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 7111 45500
SBU 1 JSW ENERGY LTD
VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 26000 159100
43300
SBU 2 JSW ENERGY LTD
VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 60000 247900
42800
LANCO KPLLANCO KONDAPALLI POWER
LTDTHERMAL-GAS 36814 85060
25776
LANCO KPL STG -IILANCO KONDAPALLI POWER
LTDTHERMAL-GAS 36600 12979
46330
LANCO KPL STG -IIIALANCO KONDAPALLI POWER
LTDTHERMAL-GAS 37100 85710
46330
LANCO KPL STG -III BLANCO KONDAPALLI POWER
LTDTHERMAL-GAS 37100 43639
46330
HINDUJA NATIONAL PCL HINDUJA NATIONAL PCL THERMAL-COAL 104000 303000 38200
MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 121164 49940
UDUPI POWER COR LTD ADANI POWER LTD THERMAL-COAL 120000 754613 42500
SPECTRUM POWER GENERATION
LTD SPECTRUM PG LTD THERMAL-GASN 20525 9256812
34952
TAQA NEYVELI POWER COM PVT
LTD TAQA NEYVELI THERMAL-LIG 25000 5840
34500
ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 251000 51000
ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 207860 36800
GMR VEMAGIRI POWER GENERATION
LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 30117
46450
EASTERN REGION
CENTRAL SECTOR
MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 64675 53113
MTPS STAGE - II KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 39000 1432 69138
BOKARO `B` TPS DVC THERMAL-COAL 63000 145670 31539
MEJIA TPS U 1-3 DVC THERMAL-COAL 63000 348298 31552
MEJIA TPS U 4 DVC THERMAL-COAL 21000 116099 34997
MEJIA TPS U 5-6 DVC THERMAL-COAL 50000 276427 35976
MEJIA TPS U 7-8 DVC THERMAL-COAL 100000 552854 36991
DURGAPUR STEEL TPS DVC THERMAL-COAL 100000 665550 39323
DURGAPUR TPS DVC THERMAL-COAL 21000 59270 35416
RAGHUNATHPUR TPS DVC THERMAL-COAL 120000 201650 35326
MAITHON HYDEL STA DVC HYDRO-HYDRO 6320 12200 17984
CHANDRAPURA TPSU1-3 DVC THERMAL-COAL 42000 257610 35095
CHANDRAPURA TPSU7-8 DVC THERMAL-COAL 50000 306673 34987
KODERMA TPS DVC THERMAL-COAL 100000 380180 38131
PANCHET HPS DVC HYDRO-HYDRO 8000 13360 17984
TILLAYA HPS DVC HYDRO-HYDRO 400 1410 17984
RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34700 35400
TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 277300 23200
TLDP -III NHPC LTD HYDRO-HYDRO 13200 55400 62000
TLDP -IV NHPC LTD HYDRO-HYDRO 16000 60300 25600
FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 957219 33700
FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 308943 41000
BONGAINGAON TPS NTPC LTD THERMAL-COAL 25000 153663 58600
KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 542277 34200
KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 942591 34200
BARH-II NTPC LTD THERMAL-COAL 132000 728021 44500
TALCHER TPS NTPC LTD THERMAL-COAL 46000 335521 30100
TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 702319 25600
TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1436521 24700
STATE SECTOR
BTPS(RampM) BIHAR STATE PGCL THERMAL-COAL 22000 12142 39700
BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 98331 10602
HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 50593 9482
CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 19689 2605
RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 53192 6033
UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 147208 14637
Page 40
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 60353 4519
IB TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 288567 25000
J P H GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 210 038 61100
MEYONG CHU GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 400 1086 61100
TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 122667 38200
DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 214339 43321
KOLAGHAT THERMAL POWER
STATION
WEST BENGAL PDCL THERMAL-COAL 126000 538269 31603
BAKRESHWAR THERMAL POWER
PLANT
WEST BENGAL PDCL THERMAL-COAL 105000 634876 32154
BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 45000 166855 33299
SANTHALDIH THERMAL POWER
STATION
WEST BENGAL PDCL THERMAL-COAL 50000 336442 34932
SAGARDIGHI THERMAL POWER
PROJECT
WEST BENGAL PDCL THERMAL-COAL 160000 423121 34705
JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 20344 68900
RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 24559 68900
TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 4623 68900
PURULIA PUMPED STORAGE
PROJECT
WEST BENGAL SEDCL HYDRO-HYDRO 90000 108816 68900
MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2768 68900
PRIVATE SECTOR
CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 49474 20230
CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 555500 70200
HALDIA ENERGY HALDIA ENERGY LTD THERMAL-COAL 60000 371000 50400
DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3688 63400
KAMALANGA TPS GMR KAMALANGA ENERGY LTD THERMAL-COAL 105000547670
33300
ADHUNIK POWER U-1 ADHUNIK POWER THERMAL-COAL 27000 158 44060
ADHUNIK POWER U-2 ADHUNIK POWER THERMAL-COAL 27000 168 44250
VL-JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 332800 23622
JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 43000 45250
JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 71700 37030
JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 70700 35920
JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 71100 38870
JOJOBERA UNIT 5 TATA POWER COM LTD THERMAL-COAL 12000 79300 44560
JOJOBERA UNIT 6 TATA POWER COM LTD THERMAL-WHR 12000 83700 12840
IEL KALINGANAGAR U-I TATA POWER COM LTD THERMAL-WG 6750 33400 22500
IEL KALINGANAGAR U-II TATA POWER COM LTD THERMAL-WG 6750 34800 22500
MAITHON UNIT 1 amp 2 TATA POWER COM LTD THERMAL-COAL 105000 678000 36100
HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 27500 24340
HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 28400 24340
HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 15800 24310
NORTH EASTERN REGION
CENTRAL SECTOR
LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 74100 36600
AGARTALA GT NEEPCO THERMAL-GAS 13500 88611 27210
ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 153111 32310
DOYANG HEP NEEPCO HYDRO-HYDRO 7500 25598 49801
KOPILI HEP NEEPCO HYDRO-HYDRO 20000 98186 11491
KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 19582 20237
KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 10310 17968
RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 124093 22945
TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 10100 17344 39000
STATE SECTOR
HYDRO POWER (122 Stns) ITANAGAR GOVT OF ARUNACHAL
PRADESHHYDRO-HYDRO 6971 6217270
24600
KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39514 17337
LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 82327 36810
NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 33318 48290
MYNTRIANG SHEP ST II ASSAM POWER GENCO HYDRO-HYDRO 300 567 35776
LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 9130 49200
LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 012 49200
DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 022 49200
TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 000 49200
UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 4990 16000
UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 6476 37000
UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 16494 14600
UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 3600 9556 15000
SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 758 8000
MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44070 44800
KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 154 41400
TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 091 41400
MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 411 41400
MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 394 41400
KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 760 41400
SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 3264 41400
LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 044 41400
BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 18953 28000
ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 43585 28200
GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 4080 11100
Note
LIG Lignite N Naptha WHR Waste Heat Recovery
Page 41
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) SRI DAMODARAM STPS APPDCL THERMAL-COAL 160000 808108 36300
PRIVATE SECTOR
KARUPPUR TANJORE LANCO TANJORE PCL THERMAL-GAS 12000 48096 28770
SIMHAPURI ENERGY LTD SIMHAPURI ENERGY LTD THERMAL-COAL 60000 143900 39100
JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 7111 45500
SBU 1 JSW ENERGY LTD
VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 26000 159100
43300
SBU 2 JSW ENERGY LTD
VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 60000 247900
42800
LANCO KPLLANCO KONDAPALLI POWER
LTDTHERMAL-GAS 36814 85060
25776
LANCO KPL STG -IILANCO KONDAPALLI POWER
LTDTHERMAL-GAS 36600 12979
46330
LANCO KPL STG -IIIALANCO KONDAPALLI POWER
LTDTHERMAL-GAS 37100 85710
46330
LANCO KPL STG -III BLANCO KONDAPALLI POWER
LTDTHERMAL-GAS 37100 43639
46330
HINDUJA NATIONAL PCL HINDUJA NATIONAL PCL THERMAL-COAL 104000 303000 38200
MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 121164 49940
UDUPI POWER COR LTD ADANI POWER LTD THERMAL-COAL 120000 754613 42500
SPECTRUM POWER GENERATION
LTD SPECTRUM PG LTD THERMAL-GASN 20525 9256812
34952
TAQA NEYVELI POWER COM PVT
LTD TAQA NEYVELI THERMAL-LIG 25000 5840
34500
ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 251000 51000
ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 207860 36800
GMR VEMAGIRI POWER GENERATION
LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 30117
46450
EASTERN REGION
CENTRAL SECTOR
MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 64675 53113
MTPS STAGE - II KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 39000 1432 69138
BOKARO `B` TPS DVC THERMAL-COAL 63000 145670 31539
MEJIA TPS U 1-3 DVC THERMAL-COAL 63000 348298 31552
MEJIA TPS U 4 DVC THERMAL-COAL 21000 116099 34997
MEJIA TPS U 5-6 DVC THERMAL-COAL 50000 276427 35976
MEJIA TPS U 7-8 DVC THERMAL-COAL 100000 552854 36991
DURGAPUR STEEL TPS DVC THERMAL-COAL 100000 665550 39323
DURGAPUR TPS DVC THERMAL-COAL 21000 59270 35416
RAGHUNATHPUR TPS DVC THERMAL-COAL 120000 201650 35326
MAITHON HYDEL STA DVC HYDRO-HYDRO 6320 12200 17984
CHANDRAPURA TPSU1-3 DVC THERMAL-COAL 42000 257610 35095
CHANDRAPURA TPSU7-8 DVC THERMAL-COAL 50000 306673 34987
KODERMA TPS DVC THERMAL-COAL 100000 380180 38131
PANCHET HPS DVC HYDRO-HYDRO 8000 13360 17984
TILLAYA HPS DVC HYDRO-HYDRO 400 1410 17984
RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34700 35400
TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 277300 23200
TLDP -III NHPC LTD HYDRO-HYDRO 13200 55400 62000
TLDP -IV NHPC LTD HYDRO-HYDRO 16000 60300 25600
FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 957219 33700
FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 308943 41000
BONGAINGAON TPS NTPC LTD THERMAL-COAL 25000 153663 58600
KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 542277 34200
KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 942591 34200
BARH-II NTPC LTD THERMAL-COAL 132000 728021 44500
TALCHER TPS NTPC LTD THERMAL-COAL 46000 335521 30100
TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 702319 25600
TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1436521 24700
STATE SECTOR
BTPS(RampM) BIHAR STATE PGCL THERMAL-COAL 22000 12142 39700
BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 98331 10602
HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 50593 9482
CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 19689 2605
RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 53192 6033
UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 147208 14637
Page 40
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 60353 4519
IB TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 288567 25000
J P H GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 210 038 61100
MEYONG CHU GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 400 1086 61100
TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 122667 38200
DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 214339 43321
KOLAGHAT THERMAL POWER
STATION
WEST BENGAL PDCL THERMAL-COAL 126000 538269 31603
BAKRESHWAR THERMAL POWER
PLANT
WEST BENGAL PDCL THERMAL-COAL 105000 634876 32154
BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 45000 166855 33299
SANTHALDIH THERMAL POWER
STATION
WEST BENGAL PDCL THERMAL-COAL 50000 336442 34932
SAGARDIGHI THERMAL POWER
PROJECT
WEST BENGAL PDCL THERMAL-COAL 160000 423121 34705
JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 20344 68900
RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 24559 68900
TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 4623 68900
PURULIA PUMPED STORAGE
PROJECT
WEST BENGAL SEDCL HYDRO-HYDRO 90000 108816 68900
MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2768 68900
PRIVATE SECTOR
CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 49474 20230
CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 555500 70200
HALDIA ENERGY HALDIA ENERGY LTD THERMAL-COAL 60000 371000 50400
DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3688 63400
KAMALANGA TPS GMR KAMALANGA ENERGY LTD THERMAL-COAL 105000547670
33300
ADHUNIK POWER U-1 ADHUNIK POWER THERMAL-COAL 27000 158 44060
ADHUNIK POWER U-2 ADHUNIK POWER THERMAL-COAL 27000 168 44250
VL-JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 332800 23622
JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 43000 45250
JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 71700 37030
JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 70700 35920
JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 71100 38870
JOJOBERA UNIT 5 TATA POWER COM LTD THERMAL-COAL 12000 79300 44560
JOJOBERA UNIT 6 TATA POWER COM LTD THERMAL-WHR 12000 83700 12840
IEL KALINGANAGAR U-I TATA POWER COM LTD THERMAL-WG 6750 33400 22500
IEL KALINGANAGAR U-II TATA POWER COM LTD THERMAL-WG 6750 34800 22500
MAITHON UNIT 1 amp 2 TATA POWER COM LTD THERMAL-COAL 105000 678000 36100
HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 27500 24340
HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 28400 24340
HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 15800 24310
NORTH EASTERN REGION
CENTRAL SECTOR
LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 74100 36600
AGARTALA GT NEEPCO THERMAL-GAS 13500 88611 27210
ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 153111 32310
DOYANG HEP NEEPCO HYDRO-HYDRO 7500 25598 49801
KOPILI HEP NEEPCO HYDRO-HYDRO 20000 98186 11491
KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 19582 20237
KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 10310 17968
RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 124093 22945
TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 10100 17344 39000
STATE SECTOR
HYDRO POWER (122 Stns) ITANAGAR GOVT OF ARUNACHAL
PRADESHHYDRO-HYDRO 6971 6217270
24600
KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39514 17337
LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 82327 36810
NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 33318 48290
MYNTRIANG SHEP ST II ASSAM POWER GENCO HYDRO-HYDRO 300 567 35776
LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 9130 49200
LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 012 49200
DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 022 49200
TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 000 49200
UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 4990 16000
UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 6476 37000
UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 16494 14600
UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 3600 9556 15000
SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 758 8000
MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44070 44800
KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 154 41400
TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 091 41400
MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 411 41400
MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 394 41400
KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 760 41400
SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 3264 41400
LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 044 41400
BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 18953 28000
ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 43585 28200
GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 4080 11100
Note
LIG Lignite N Naptha WHR Waste Heat Recovery
Page 41
File NoCEA-CH-14-1142018-Coordination Division
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 60353 4519
IB TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 288567 25000
J P H GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 210 038 61100
MEYONG CHU GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 400 1086 61100
TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 122667 38200
DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 214339 43321
KOLAGHAT THERMAL POWER
STATION
WEST BENGAL PDCL THERMAL-COAL 126000 538269 31603
BAKRESHWAR THERMAL POWER
PLANT
WEST BENGAL PDCL THERMAL-COAL 105000 634876 32154
BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 45000 166855 33299
SANTHALDIH THERMAL POWER
STATION
WEST BENGAL PDCL THERMAL-COAL 50000 336442 34932
SAGARDIGHI THERMAL POWER
PROJECT
WEST BENGAL PDCL THERMAL-COAL 160000 423121 34705
JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 20344 68900
RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 24559 68900
TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 4623 68900
PURULIA PUMPED STORAGE
PROJECT
WEST BENGAL SEDCL HYDRO-HYDRO 90000 108816 68900
MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2768 68900
PRIVATE SECTOR
CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 49474 20230
CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 555500 70200
HALDIA ENERGY HALDIA ENERGY LTD THERMAL-COAL 60000 371000 50400
DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3688 63400
KAMALANGA TPS GMR KAMALANGA ENERGY LTD THERMAL-COAL 105000547670
33300
ADHUNIK POWER U-1 ADHUNIK POWER THERMAL-COAL 27000 158 44060
ADHUNIK POWER U-2 ADHUNIK POWER THERMAL-COAL 27000 168 44250
VL-JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 332800 23622
JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 43000 45250
JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 71700 37030
JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 70700 35920
JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 71100 38870
JOJOBERA UNIT 5 TATA POWER COM LTD THERMAL-COAL 12000 79300 44560
JOJOBERA UNIT 6 TATA POWER COM LTD THERMAL-WHR 12000 83700 12840
IEL KALINGANAGAR U-I TATA POWER COM LTD THERMAL-WG 6750 33400 22500
IEL KALINGANAGAR U-II TATA POWER COM LTD THERMAL-WG 6750 34800 22500
MAITHON UNIT 1 amp 2 TATA POWER COM LTD THERMAL-COAL 105000 678000 36100
HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 27500 24340
HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 28400 24340
HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 15800 24310
NORTH EASTERN REGION
CENTRAL SECTOR
LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 74100 36600
AGARTALA GT NEEPCO THERMAL-GAS 13500 88611 27210
ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 153111 32310
DOYANG HEP NEEPCO HYDRO-HYDRO 7500 25598 49801
KOPILI HEP NEEPCO HYDRO-HYDRO 20000 98186 11491
KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 19582 20237
KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 10310 17968
RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 124093 22945
TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 10100 17344 39000
STATE SECTOR
HYDRO POWER (122 Stns) ITANAGAR GOVT OF ARUNACHAL
PRADESHHYDRO-HYDRO 6971 6217270
24600
KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39514 17337
LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 82327 36810
NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 33318 48290
MYNTRIANG SHEP ST II ASSAM POWER GENCO HYDRO-HYDRO 300 567 35776
LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 9130 49200
LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 012 49200
DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 022 49200
TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 000 49200
UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 4990 16000
UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 6476 37000
UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 16494 14600
UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 3600 9556 15000
SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 758 8000
MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44070 44800
KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 154 41400
TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 091 41400
MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 411 41400
MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 394 41400
KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 760 41400
SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 3264 41400
LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 044 41400
BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 18953 28000
ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 43585 28200
GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 4080 11100
Note
LIG Lignite N Naptha WHR Waste Heat Recovery
Page 41
File NoCEA-CH-14-1142018-Coordination Division