Government of India
विदयत मतरालयMinistry of Power
कनदरीय विदयत पराधिकरण
भारत सरकार
Apr-19
Central Electricity Authority
Executive Summary on Power Sector
SN Section A - Highlights of Power Sector Page
1 Electricity Generation for Apr-2019 (BU) 1A amp 1B
2 Generating Capacity Addition for Apr-2019 (MW) 2
3 List of Projects Commissioned in Apr-2019 3
4 All India Installed Capacity (MW) Region-wise as on 30-04-19 3
5 All India Installed Capacity (MW) Sector-wise as on 30-04-19 4
6 Transmission Lines Added during Apr-2019 (Ckms) 5
7 Transformation Capacity Addition during Apr-2019 (MVA) 6
8 Power Supply Position (Energy amp Peak) in Apr-2019 7
9 Peak Shortage of Power Supply (MW) in Different Regions 8-9
10 All India PLF Sector-wise for Apr-2019 10
11 T amp D and AT amp C Losses ()
12 All India Village Electrification
13 Average cost of Power amp Average Realisation
14 All India Coal consumption for Power Generation (MT)
1 Capacity Addition Targets and Achievements in 12th Plan 12
2 Capacity Addition Targets amp Achievements during Apr-2019 13
3 Installed Capacity in various Regions including their shares 14-19
1 Programme and Achievements of Transmission Lines in Apr-2019
2 List of Transmission Lines CommissionedReady for commissioning during Apr-2019
1 Programme and Achievements of Sub-Stations in Apr-2019
2 List of Sub Stations commissionedready for commisssioning in Apr-2019
1 Electricity Generation (MU) Targets and Achievements for 2019-20 22
1 Power Supply Position (Provisional) for Apr-2019 23
2 Peak Demand and Peak Met (Provisional) for Apr-2019 24
3 Power Supply Position (Revised) for Mar-2019 25
4 Peak Demand and Peak Met (Revised) for Mar-2019 26
5 Notified Power cuts Restrictions on Industries during Apr-2019 27
6 Power Supply to Agricultural Sector during Apr-2019 28
1 Growth of Installed Capacity since 6th Plan 29
2 Growth of Transmission Sector since 6th Plan 30
3 All India Yearly Coal consumption for Power Generation (Utilities)
4 All India Annual Per Capita Consumption of Electricity since 2006
5 Average cost of power supply amp Average realisation (Paisakwh)
6 Growth of Rural Electrification amp Pump Sets Energisation
7 Status of Hydro Schemes Cleared by the CEA in Apr-2019
1 Rate of sale of power for the year 2016-17 33-41
Section H - Rate of sale of power for the year 2016-17
Executive Summary for the Month of Apr-2019
32
11
20
21
31
Section B - Capacity Addition
Section C - Transmission Lines
Section D - Sub Stations
Section E - Electricity Generation
Section F - Power supply position
Contents
Section G - Growth of Power Sector
SN Contents Page
1Electricity Generation (Conventional Sources) for Apr-2019 (BU) 1
2 Generating Capacity Addition for Apr-2019 (MW) 2
3 List of Projects Commissioned in Apr-2019 3
4 All India Installed Capacity (MW) Region-wise as on 30-04-19 3
5 All India Installed Capacity (MW) Sector-wise as on 30-04-19 4
6 Transmission Lines Added during Apr-2019 (Ckms) 5
7 Transformation Capacity Addition during Apr-2019 (MVA) 6
8 Power Supply Position (Energy amp Peak) in Apr-2019 7
9 Peak Shortage of Power Supply (MW) in Different Regions 8-9
10 All India PLF Sector-wise for Apr-2019 10
11 T amp D and AT amp C Losses ()
12 All India Village Electrification
13 Average cost of Power amp Average Realisation
14 All India Coal consumption for Power Generation (MT)
Section A - Highlights of Power Sector
11
Achievement
Apr-19
Thermal 9442 152
Nuclear 318 -390
Hydro 1109 4680
Bhutan Import 024 94659
All India 10893 485
Type
Thermal
Nuclear
Hydro
Bhutan Import
All India
1A
9300
9300
1 Electricity Generation for Apr-2019 (BU)
Apr-19
TypeAchievement
Apr-18
Targets Change of
Achievement
wrt Apr-2018
9896
002
3673
11235
756
331
9539
48510891039
10389
018
9442
3177
152
Change wrt Apr-18 to Apr-18
Electricity Generation During Apr-18 to Apr-18 amp Apr-19 to Apr-19 (BU)
Apr-18 to Apr-18 Apr-19 to Apr-19
11092
024002
-390331
4680756
94247
10389
10893
10100
10200
10300
10400
10500
10600
10700
10800
10900
11000
BU
Apr-18 Apr-19
10391089
00
200
400
600
800
1000
1200
BU
Apr-18 to Apr-18 Apr-19 to Apr-19
Generation from
Conventional
Sources
Generation
from
Renewable
Sources
Total Generation from
Conventional Sources
Generation from
Renewable SourcesTotal
Growth in
Conventional
Generation
Growth in
Renewable
Generation
Growth in
Total
Generation
(BU) (BU) (BU) (BU) (BU) (BU) () () ()
108929 9900 118829 103889 8443 112332 485 1726 578
Note Tentative
SlNo
Source-Wise All
India
Generation
from
Renewables Mar-2019 Mar-2018 April 2018 to March 2019 April 2017 to March 2018
1 Wind 2965930 2906760 62036380 52666090
2 Solar 4307980 3311530 39268200 25871070
3 Biomass 255320 270430 2763820 3404950
4 Bagasse 1814860 1794220 13562670 11847350
5 Small Hydro 473060 376850 8702750 7691580
6 Others 30700 33120 425280 358450
Total 9847850 8692910 126759100 101839490
Note 1) Data as received from SLDCElectricity Department of the respective states or from the electricity department
2) 25 MW Khopli-II project of NEEPCO located in Assam is considered under Small Hydro wef 01072018 Earlier it was considered under Hydro
3) Previous month generation has been taken as SLDC has not furnished generation data for the current month
Electricity Generation (Conventional and Renewable Sources)
Apr-2019 Apr-2018 Growth
1B
For the Month of Cummulative for the period
All India Generation From Renewables (All Figures are in MU)
Achievement Targets Achievement
Apr-18
Thermal 69755 1160 0 000
Hydro 0 0 0 NA
Nuclear 0 0 0 NA
All India 69755 1160 0 000
Apr-18 to Apr-18 Apr-19 to Apr-19 Change wrt Previous Year
Thermal 69755 0 00
Hydro 0000 0 NA
Nuclear 0000 0 NA
All India 69755 0 00
2
2 Generating Capacity Addition for Apr-2019 (MW)
Generating Capacity Addition during Apr-18 to Apr-18 amp Apr-19 to Apr-19
NA- Not Applicable
Achivement
wrt Apr-2018Type
Apr-19
698
000
10
20
30
40
50
60
70
80
1Apr-18 Apr-19
0000
10000
20000
30000
40000
50000
60000
70000
80000
Apr-18 to Apr-18 Apr-19 to Apr-19
1
2
3
Nuclear Hydro RES Grand TotalRegion Coal Lignite Gas Diesel Total
Northern 5036020 158000 578126 000 5772146 162000 1970777 1419902 9324825
Western 7280862 154000 1080649 000 8515511 184000 754750 2307894 11762155
Southern 4304202 314000 647366 56158 5321726 332000 1177483 3862018 10693227
Eastern 2746364 000 10000 000 2756364 000 494212 140148 3390724
North-East 77002 000 177581 3600 258183 000 142700 32429 433311
Islands 000 000 000 4005 4005 000 000 1773 5778
ALL INDIA 19444450 626000 2493722 63763 22627934 678000 4539922 7764163 35610019
Note Captive Genaration is not included in the total Captive Power capacity as on 31032017 RES as on 31032019 3
Thermal
Nuclear
3 List of Projects Commissioned During Apr-2019
4 All India Installed Capacity (MW) Region-wise as on 30-04-19
NIL
NIL
Thermal
NIL
Hydro
22627934
678000
4539922
7764163
35610019
51529
000
5000000
10000000
15000000
20000000
25000000
30000000
35000000
40000000
Thermal Nuclear Hydro RES Total Captive
Thermal Nuclear Hydro RES Total Captive
Total = 356100189
Sector
Coal Lignite Gas Diesel Total
State 6407650 129000 711871 36393 7284913 000 2987880 234793 10507586
Private 7468800 183000 1058060 27370 8737230 000 339400 7366140 16442770
Central 5568000 314000 723791 000 6605791 678000 1212642 163230 8659663
All India 19444450 626000 2493722 63763 22627934 678000 4539922 7764163 35610019
State 10507586
Private 16442770
Central 8659663
Electricity Generation (MU) Targets and Achievements for 2016-17
5 All India Installed Capacity (MW) Sector-wise as on 30-04-19
4
Grand TotalTHERMAL
Nuclear Hydro RES
RES as on 31032019
State 10507586 30
Private 16442770 46
Central 8659663 24
All India Installed Capacity(MW) (Sector-Wise)
Voltage Level
+- 500 KV HVDC
+- 800 KV HVDC
765 KV
400 KV
220 KV
All India
Voltage Level
+- 500 KV HVDC
+- 800 KV HVDC
765 KV
400 kV
220 KV
All India
5
481 401
763 474
0 0
242 53
40 20
0 0
242 53
40 20
481 401
763 474
Transmission Lines Added duringApr-18 to Apr-18 ampApr-19 to Apr-19 (Ckms)
Apr-18 to Apr-18 Apr-19 to Apr-19
0 0
6 Transmission Lines Added during Apr-2019 (Ckms)
Apr-18 Apr-19
0 0
763
474
0
100
200
300
400
500
600
700
800
900
All India
Ckm
s
Apr-18 Apr-19
763
474
0
100
200
300
400
500
600
700
800
900
All India
Ckm
s
Apr-18 to Apr-18 Apr-19 to Apr-19
Voltage Level
+- 800 KV HVDC
+- 500 KV HVDC
765 KV
400 KV
220 KV
All India
Voltage Level
+- 800 KV HVDC
+- 500 KV HVDC
765 KV
400 KV
220 KV
All India
6
0 0
All India Transformation Capacity Addition during Apr-18 to Apr-18 amp Apr-19
to Apr-19 (MVA)
4600
0
500
2795
1305
5470
4000
185
1285
0
Apr-18 to Apr-18 Apr-19 to Apr-19
5470
0
500
4600
2795
1305
7 Transformation Capacity Addition During Apr-2019 (MVA)
0
4000
185
1285
0 0
Apr-18 Apr-19
5470
4600
4000
4200
4400
4600
4800
5000
5200
5400
5600
MV
A
Apr-18 Apr-19
5470 4600
0
74520
1
MV
A
Apr-18 to Apr-18 Apr-19 to Apr-19
Apr-2018 Apr-2019 Apr-2018 Apr-2019 Apr-2018 Apr-2019
Northern 28590 30094 28170 29786 -15 -10
Western 33235 34875 33233 34868 00 00
Southern 29211 31111 29166 31109 -02 00
Eastern 11752 12851 11650 12850 -09 00
North Eastern 1225 1300 1174 1228 -42 -55
All India 104013 110231 103393 109842 -06 -04
Apr-2018 Apr-2019 Apr-2018 Apr-2019 Apr-2018 Apr-2019
Northern 48824 54476 48367 53985 -09 -09
Western 50654 56242 50434 56222 -04 00
Southern 45946 49155 45684 49103 -06 -01
Eastern 21320 23349 21275 23349 -02 00
North Eastern 2600 2848 2552 2780 -18 -24
All India 162492 177411 161286 176810 -07 -03
Apr-2019 Figures are Provisional
7
8 Power Supply Position (Energy amp Peak) in Apr-2019
Peak Demand Peak Met
Requirement Availability
Energy (MU)Region
Surplus(+)
Deficit (-) in
Surplus(+)
Deficit (-) in Region
Power (MW)
Chandigarh Delhi Haryana HP JampK Punjab Rajasthan UP Utrakhand Apr-2018 0 0 0 0 546 0 0 247 0
Apr-2019 0 0 0 0 565 0 0 0 0
Chattisgarh Gujarat MP Maharashtra Daman amp Diu Dadar Nagar Goa
Apr-2018 13 11 3 99 0 0 0
Apr-2019 22 6 0 8 1 0 0
AP Telangana Karnataka Kerala Tamil Nadu Puducherry Lakshadweep
Apr-2018 22 0 2 0 0 20 0
Apr-2019 0 0 0 8 0 2 0
8
9 Peak Shortage of Power Supply (MW) in Different Regions in Apr-2019
0 0 0 0
565
0 0 0 00 0 0 0
546
0 0
247
0
0
400
800
Ch
an
dig
ar
h Delh
i
Ha
rya
na
HP
Jamp
K
Pu
nja
b
Ra
jasth
an
UP
Utr
akhan
d
MW
Northern States (MW) Apr-2019 Apr-2018
22
6 0 8 1 0 0
13
11
3
99
0 0 0
0
50
100
150
Ch
attis
gar
h
Guja
rat
MP
Mah
ara
shtr
a
Da
man amp
Diu
Da
dar
Na
gar G
oa
MW
Western States (MW) Apr-2019 Apr-2018
0 0 08
0 2 0
22
0 2 0 0
20
00
50
AP Telangana Karnataka Kerala Tamil Nadu Puducherry Lakshadweep
Southern State (MW) Apr-2019 Apr-2018
Bihar DVC Jharkhand Odisha West Bengal Sikkim AampN Island
Apr-2018 0 39 0 0 7 0 4
Apr-2019 0 0 0 0 0 0 4
Arunachal Assam Manipur Meghalaya Mizoram Nagaland Tripura
Apr-2018 5 30 7 0 9 29 4
Apr-2019 3 45 9 0 3 26 1
9
0 0 0 0 0 0
4
0
39
0 0
7
0
4
01020304050
Bih
ar
DV
C
Jha
rkh
an
d
Od
ish
a
We
st
Be
ng
al
Sik
kim
Aamp
NIs
land
MW
Eastern States (MW) Apr-2019 Apr-2018
3
45
9
0 3
26
1
5 7
0
9
29
4
0
10
20
30
40
50
Aru
na
cha
l
Assa
m
Ma
nip
ur
Me
gh
ala
ya
Miz
ora
m
Na
gala
nd
Trip
ura
MW
North-Eastern States (MW)
Sector Apr-2018 Apr-2019
Central 7634 7459
State 6438 6142
Private Sector IPP 5525 6005
Private Sector UTL 6815 6440
ALL INDIA 6454 6471
Month PLF 2018 PLF 2019
Jan 6215 6054
Feb 6230 6051
March 6452 6340
April 6454 6471
For Coal and Lignite based Power Plants and Provisional based on Actual-Cum-Assesment
10
PLF of Thermal Power Plants
(excluding gas based power plants)
All India PLF of Thermal Plants (Excluding Gas Based Plants) Month-wise
10 All India Thermal PLF Sector-wise (Excluding Gas Based Power Plants) for Apr-2019
5800
6000
6200
6400
6600
Jan Feb March April
Months
All India PLF Month-wise
PLF 2018 PLF 2019
7634
64385525
6815 6454
7459
6142 60056440 6471
000
2000
4000
6000
8000
10000
Central State Private Sector IPP Private Sector UTL ALL INDIA
All India Thermal PLF
Apr-2018 Apr-2019
2012-13 2013-14 2014-15 2015-16 2016-17 2017-18
TampD Losses 2304 2284 2277 2181 2142 2104
ATampC Losses 2548 2262 2572 2398 NA NA
Provisional
Note As per PFC for utilities selling directly to consumers NA- Not Available
Total Number of Villages
597464
Note From the year 2004-05 onwards Definition of Village Electrification-
A village would be declared Electrified if
Without
Subsidy
Gap ACS-
ARR(
Without
Subsidy)
Paiseunit
Gap ACS-
ARR (on
subsidy
booked
basis)
paiseunit
Gap ACS-
ARR (on
subsidyrece
ived basis)
paiseunit
2013-14 400 118 76 77
2014-15 412 108 58 60
Source- PFC Reports on the performance of State Power Utilities
2013-14 4894
2014-15 5304
2015-16 5459
2016-17 5743
2017-18 6080
2018-19 6289
11
11 T amp D and ATampC Losses ()
12 All India Village Electrification
Villiages Electrified (Nos)
10000All villages as per census 2011 has
been electrified on 28042018
Villages electrified
Average cost of supply(ACS)
(paiseunit)
i) Basic Infrastructure such as Distribution Transformer and Distribution lines are provided in the inhabited locality
as well as Dalit Basti hemlet where it exists (For electrification through Non-Conventional Energy Sources a
Distribution Transformer may not be necessary)
14 All India Coal consumption for Power Generation (MT)
520
Average Revenue Realization(paiseunit)
518
Year
ii) Electricity is provided to Public places like Schools Panchayat Office Health Centre Dispensaries Community
Centres etc and
iv) Mandatory Certification from Gram Panchayat regarding the completion of village electrification should be
obtained
13 Average cost of Power amp Average Realisation
iii) The number of households electrified should be at least 10 of the total number of households in the village
SN Contents Page
1 Capacity Addition Targets and Achievements in 12th Plan amp upto March2019 12
2 Capacity Addition Targets amp Achievements during Apr-2019 and Apr-19 to Apr-19 13
3 Installed Capacity in various Regions including their shares 14-19
Section B - Capacity Addition
(i) CAPACITY ADDTION TARGETS AND ACHIEVEMENTS IN THE 12TH PLAN Figures in MW
TARGET ACH TARGET ACH TARGET ACH TARGET ACH
CENTRAL 14878 15869 6004 2584 5300 2000 26182 20453
STATE 13922 22201 1608 2276 0 0 15530 24477
PRIVATE 43540 53661 3285 619 0 0 46825 54280
ALL INDIA 72340 91730 10897 5479 5300 2000 88537 99209
(ii) CAPACITY ADDITION TARGET AND ACHIEVEMENT FOR 2017-18 (IN MW)
THERMAL HYDRO NUCLEAR
TARGET ACH TARGET ACH TARGET ACH TARGET ACH
CENTRAL 4880 3170 800 390 500 6180 3560
STATE 3546 1760 300 200 0 3846 1960
PRIVATE 2940 3780 205 205 0 3145 3985
ALL INDIA 11366 8710 1305 795 500 0 13171 9505
(iii) CAPACITY ADDITION ACHIEVEMENT FOR 2018-19 (IN MW)
TARGET ACH TARGET ACH TARGET ACH TARGET ACH
CENTRAL 2760 1960 710 110 0 0 3470 2070
STATE 4506 2850 130 30 0 0 4636 2880
PRIVATE 0 972 0 0 0 0 0 972
ALL INDIA 7266 5782 840 140 0 0 8106 5922
12
SECTOR
SECTOR
TOTAL
TOTALNUCLEARHYDROTHERMAL
1 Capacity Addtion Targets and Achievements in the 12th Plan amp upto March2019
SECTORTHERMAL HYDRO NUCLEAR TOTAL
(MW)
Cummulative
Deviation
Target Achievement Target Achievement (+) (-)
Central 6040 500 0 500 0 -500
State 425615 660 0 660 0 -660
Private 0 0 0 0 0 0
Total 1029615 1160 0 1160 0 -1160
Central 600 0 0 0 0 0
State 21099 0 0 0 0 0
Private 379 0 0 0 0 0
Total 118999 0 0 0 0 0
Nuclear Central 700 0 0 0 0 0
Central 7340 500 0 500 0 -500
State 446714 660 0 660 0 -660
Private 379 0 0 0 0 0
Total 1218614 1160 0 1160 0 -1160
Electricity Generation (MU) Targets and Achievements for 2016-17
13
Hydro
All India
Capacity Addition TargetsAchievements during the Month of Apr-2019
Thermal
2 Capacity Addition Targets Achievements During Apr-2019
Schemes Sector
Target 2019-20
Apr-19 to Apr-19Apr-19
11
60
0 0
11
60
0 0 0 0
0
200
400
600
800
1000
1200
1400
Thermal Hydro Nuclear Total
MW
Targets and Achievement during 2019-20Target Achievement
0
200
400
600
800
1000
1200
Thermal Hydro Nuclear Total
1160
0 0
1160
0 0 00
MW
Target Achievement
Coal Lignite Gas Diesel Total
State 1634400 25000 287920 000 1947320 000 869755 69956 2887031
Private 2168083 108000 55800 000 2331883 000 251400 1312046 3895329
Central 1233537 25000 234406 000 1492943 162000 849622 37900 2542465
Sub Total 5036020 158000 578126 000 5772146 162000 1970777 1419902 9324825
State 2156000 104000 284982 000 2544982 000 544650 54789 3144421
Private 3474567 50000 467600 000 3992167 000 48100 2186476 6226743
Central 1650295 000 328067 000 1978362 184000 162000 66630 2390992
Sub Total 7280862 154000 1080649 000 8515511 184000 754750 2307894 11762155
State 1993250 000 79198 28788 2101236 000 1177483 58688 3337407
Private 1187450 25000 532210 27370 1772030 000 000 3749140 5521170
Central 1123502 289000 35958 000 1448460 332000 000 54190 1834650
Sub Total 4304202 314000 647366 56158 5321726 332000 1177483 3862018 10693227
State 624000 000 10000 000 634000 000 353792 27511 1015303
Private 638700 000 000 000 638700 000 39900 111637 790237
Central 1483664 000 000 000 1483664 000 100520 1000 1585184
Sub Total 2746364 000 10000 000 2756364 000 494212 140148 3390724
State 000 000 49771 3600 53371 000 42200 23325 118895
Private 000 000 2450 000 2450 000 000 6104 8554
Central 77002 000 125360 000 202362 000 100500 3000 305862
Sub Total 77002 000 177581 3600 258183 000 142700 32429 433311
State 000 000 000 4005 4005 000 000 525 4530
Private 000 000 000 000 000 000 000 738 738
Central 000 000 000 000 000 000 000 510 510
Sub Total 000 000 000 4005 4005 000 000 1773 5778
State 6407650 129000 711871 36393 7284913 000 2987880 234793 10507586
Private 7468800 183000 1058060 27370 8737230 000 339400 7366140 16442770
Central 5568000 314000 723791 000 6605791 678000 1212642 163230 8659663
Total 19444450 626000 2493722 63763 22627934 678000 4539922 7764163 35610019
Figures at decimal may not tally due to rounding off
Note -
(As per latest information available with MNRE)
Break up of RES all India as on 31032019 is given below (in MW)
459315 3562597 2818071 7764163
A 0 MW
B Apr 2019 0 MW
C
Apr 2019 0 MW
D Net Capacity Added during Apr 2019 A-B-C 0 MW
Sector wise breakup of RES capacity as shown is provisional
Share of installed capacity of BBMB Stations is included in state sector of partner states
BM PowerCogen Waste to Energy
910350 13830
Capacity Added during Apr 2019
Capacity Retired during
Capacity removed due to change
from Conventional to RES during
Islands
ALL INDIA
Abbreviation- SHP=Small Hydro Project (le 25 MW) BP=Biomass Power UampI=Urban amp Industrial Waste Power RES=Renewable Energy Sources
1 RES include SHP BP UampI Solar and Wind Energy Installed capacity in respect of RES (MNRE) as on 31032019
Small
Hydro PowerWind Power
Bio-PowerSolar Power
Total
Capacity
RES
(MNRE)
Northern Region
Western Region
Southern Region
Eastern Region
North Eastern
Region
ALL INDIA INSTALLED CAPACITY (IN MW) OF POWER STATIONS
(As on 30042019)
(UTILITIES)
Region Ownership Sector
Mode wise breakup
Grand TotalThermalNuclear Hydro
Coal Lignite Gas Diesel Total
State 13500 000 180040 000 193540 000 000 000 193540
Private 86922 000 10800 000 97722 000 000 17889 115611
Central 311272 000 20701 000 331973 10283 72309 000 414565
Sub-Total 411694 000 211541 000 623235 10283 72309 17889 723716
State 272000 000 15000 000 287000 000 110282 6930 404212
Private 408078 000 000 000 408078 000 20000 34512 462590
Central 129472 000 53561 000 183034 10094 66370181 500 259998
Sub-Total 809550 000 68561 000 878112 10094 196652 41942 1126799
State 000 000 000 000 000 000 69460 25661 95121
Private 000 000 000 000 000 000 99200 62668 161868
Central 18340 000 6201 000 24541 2895 122388 000 149824
Sub-Total 18340 000 6201 000 24541 2895 291048 88329 406813
State 000 000 17500 000 17500 000 123000 12903 153403
Private 000 000 000 000 000 000 000 6483 6483
Central 50639 000 12907 000 63547 6798 109188 000 179533
Sub-Total 50639 000 30407 000 81047 6798 232188 19386 339419
State 176000 000 15000 000 191000 000 259770 12780 463550
Private 511550 000 000 000 511550 000 28800 115462 655812
Central 85458 000 26401 000 111859 19681 92342 000 223882
Sub-Total 773008 000 41401 000 814409 19681 380912 128242 1343244
State 626000 25000 60380 000 711380 000 109618 2385 823383
Private 280200 108000 000 000 388200 000 10400 730181 1128781
Central 95625 25000 22110 000 142735 55674 73901 34400 306710
Sub-Total 1001825 158000 82490 000 1242315 55674 193919 766966 2258874
State 546900 000 000 000 546900 000 72410 2510 621820
Private 871433 000 000 000 871433 000 84200 288760 1244393
Central 379639 000 54949 000 434588 28948 180253 3000 646789
Sub-Total 1797972 000 54949 000 1852921 28948 336863 294270 2513002
State 000 000 000 000 000 000 125215 6787 132002
Private 9900 000 45000 000 54900 000 8800 52620 116320
Central 34324 000 6966 000 41290 3124 47554 000 91968
Sub-Total 44224 000 51966 000 96190 3124 181569 59407 340290
State 000 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 000 3471 3471
Central 3815 000 1503 000 5317 801 10171 000 16289
Sub-Total 3815 000 1503 000 5317 801 10171 3471 19760
124953 000 29105 000 154058 23703 75145 000 252907
State 1634400 25000 287920 000 1947320 000 869755 69956 2887031
Private 2168083 108000 55800 000 2331883 000 251400 1312046 3895329
Central 1233537 25000 234406 000 1492943 162000 849622 37900 2542465
Grand Total 5036020 158000 578126 000 5772146 162000 1970777 1419902 9324825
Delhi
Haryana
Himachal Pradesh
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
NORTHERN REGION
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
(As on 30042019)
State Ownership Sector
Mode wise breakup
Grand TotalThermalNuclear Hydro
RES
(MNRE)
Jammu amp Kashmir
Punjab
Rajasthan
Uttar Pradesh
Uttarakhand
Chandigarh
Central - Unallocated
Total (Northern
Region)
(As on 30042019)
Coal Lignite Gas Diesel Total
State 000 000 000 000 000 000 000 005 005
Private 000 000 4800 000 4800 000 000 392 5192
Central 46959 000 1967 000 48926 2600 000 000 51526
Sub-Total 46959 000 6767 000 53726 2600 000 397 56723
State 000 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 000 1447 1447
Central 14141 000 4334 000 18475 700 000 000 19175
Sub-Total 14141 000 4334 000 18475 700 000 1447 20622
State 371000 104000 217782 000 692782 000 77200 6470 776452
Private 726567 50000 396000 000 1172567 000 000 833180 2005747
Central 324243 000 42400 000 366643 55900 000 24330 446873
Sub-Total 1421810 154000 656182 000 2231992 55900 77200 863980 3229072
State 540000 000 000 000 540000 000 170366 8396 718762
Private 617400 000 10000 000 627400 000 000 418040 1045440
Central 334238 000 25700 000 359938 27300 152000 30000 569238
Sub-Total 1491638 000 35700 000 1527338 27300 322366 456436 2333440
State 228000 000 000 000 228000 000 12000 1105 241105
Private 885000 000 000 000 885000 000 000 52430 937430
Central 211075 000 000 000 211075 4800 10000 000 225875
Sub-Total 1324075 000 000 000 1324075 4800 22000 53535 1404410
State 1017000 000 67200 000 1084200 000 285084 38813 1408097
Private 1245600 000 56800 000 1302400 000 48100 880441 2230941
Central 466780 000 227273 000 694053 69000 000 12300 775353
Sub-Total 2729380 000 351273 000 3080653 69000 333184 931553 4414390
State 000 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 000 546 546
Central 19560 000 6634 000 26194 900 000 000 27094
Sub-Total 19560 000 6634 000 26194 900 000 546 27640
233300 000 19759 000 253059 22800 000 000 275859
State 2156000 104000 284982 000 2544982 000 544650 54789 3144421
Private 3474567 50000 467600 000 3992167 000 48100 2186476 6226743
Central 1650295 000 328067 000 1978362 184000 162000 66630 2390992
Grand Total 7280862 154000 1080649 000 8515511 184000 754750 2307894 11762155
Goa
Daman amp Diu
Gujarat
Madhya Pradesh
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
WESTERN REGION
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
ThermalNuclear Hydro
RES
(MNRE)
State Ownership Sector
Mode wise breakup
Grand Total
Chhattisgarh
Maharashtra
Dadra amp Nagar
Naveli
Central - Unallocated
Total (Western
Region)
(As on 30042019)
Coal Lignite Gas Diesel Total
State 501000 000 23540 000 524540 000 167360 5618 697518
Private 387388 000 381318 3680 772386 000 000 743342 1515728
Central 154683 12773 000 000 167456 12727 000 25000 205183
Sub-Total 1043071 12773 404858 3680 1464382 12727 167360 773960 2418429
State 558250 000 000 000 558250 000 247993 4122 810365
Private 83945 000 83182 000 167127 000 000 393644 560771
Central 180685 14927 000 000 195612 14873 000 1000 211485
Sub-Total 822880 14927 83182 000 920989 14873 247993 398766 1582621
State 502000 000 000 12792 514792 000 358660 19389 892841
Private 195850 000 000 2520 198370 000 000 1363591 1561961
Central 242780 40140 000 000 282920 69800 000 000 352720
Sub-Total 940630 40140 000 15312 996082 69800 358660 1382979 2807521
State 000 000 000 15996 15996 000 185650 17290 218936
Private 61500 000 17400 000 78900 000 000 19021 97921
Central 86142 28180 35958 000 150280 36200 000 5000 191480
Sub-Total 147642 28180 53358 15996 245176 36200 185650 41311 508337
State 432000 000 52408 000 484408 000 217820 12270 714498
Private 458767 25000 50310 21170 555247 000 000 1229228 1784475
Central 302532 136420 000 000 438952 144800 000 23190 606942
Sub-Total 1193299 161420 102718 21170 1478607 144800 217820 1264688 3105915
State 000 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 000 000 000
Central 000 10000 000 000 10000 000 000 000 10000
Sub-Total 000 10000 000 000 10000 000 000 000 10000
State 000 000 3250 000 3250 000 000 000 3250
Private 000 000 000 000 000 000 000 314 314
Central 14080 10760 000 000 24840 8600 000 000 33440
Sub-Total 14080 10760 3250 000 28090 8600 000 314 37004
142600 35800 000 000 178400 45000 000 000 223400
State 1993250 000 79198 28788 2101236 000 1177483 58688 3337407
Private 1187450 25000 532210 27370 1772030 000 000 3749140 5521170
Central 1123502 289000 35958 000 1448460 332000 000 54190 1834650
Grand Total 4304202 314000 647366 56158 5321726 332000 1177483 3862018 10693227
Kerala
Andhra Pradesh
Telangana
Karnataka
Total (Southern
Region)
Tamil Nadu
NLC
Puducherry
Central - Unallocated
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
SOUTHERN REGION
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
State Ownership Sector
Mode wise breakup
Grand TotalThermalNuclear Hydro
RES
(MNRE)
(As on 30042019)
Coal Lignite Gas Diesel Total
State 000 000 000 000 000 000 000 7070 7070
Private 28100 000 000 000 28100 000 000 25545 53645
Central 384933 000 000 000 384933 000 11000 000 395932
Sub-Total 413033 000 000 000 413033 000 11000 32615 456647
State 42000 000 000 000 42000 000 13000 405 55405
Private 73000 000 000 000 73000 000 000 3495 76495
Central 39374 000 000 000 39374 000 6100 000 45474
Sub-Total 154374 000 000 000 154374 000 19100 3900 177374
State 540000 000 10000 000 550000 000 98600 12195 660795
Private 243700 000 000 000 243700 000 000 35250 278950
Central 76077 000 000 000 76077 000 41000 000 117077
Sub-Total 859777 000 10000 000 869777 000 139600 47445 1056822
State 000 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 000 000 000
Central 698504 000 000 000 698504 000 18620 000 717124
Sub-Total 698504 000 000 000 698504 000 18620 000 717124
State 42000 000 000 000 42000 000 206192 2630 250822
Private 293900 000 000 000 293900 000 000 47346 341246
Central 163390 000 000 000 163390 000 8900 1000 173290
Sub-Total 499290 000 000 000 499290 000 215092 50976 765358
State 000 000 000 000 000 000 36000 5211 41211
Private 000 000 000 000 000 000 39900 001 39901
Central 8703 000 000 000 8703 000 6400 000 15103
Sub-Total 8703 000 000 000 8703 000 82300 5212 96215
112683 000 000 000 112683 000 8501 000 121184
State 624000 000 10000 000 634000 000 353792 27511 1015303
Private 638700 000 000 000 638700 000 39900 111637 790237
Central 1483664 000 000 000 1483664 000 100520 1000 1585184
Grand Total 2746364 000 10000 000 2756364 000 494212 140148 3390724
Total (Eastern
Region)
Bihar
Jharkhand
West Bengal
DVC
Odisha
Sikkim
Central - Unallocated
HydroOwnership Sector
Mode wise breakup
Grand TotalThermalNuclear
RES
(MNRE)
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
State
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
EASTERN REGION
(As on 30042019)
Coal Lignite Gas Diesel Total
State 000 000 32821 000 32821 000 10000 501 43322
Private 000 000 2450 000 2450 000 000 2650 5100
Central 40852 000 43556 000 84408 000 35708 2500 122616
Sub-Total 40852 000 78827 000 119679 000 45708 5651 171038
State 000 000 000 000 000 000 000 10711 10711
Private 000 000 000 000 000 000 000 2939 2939
Central 3705 000 4682 000 8387 000 11655 000 20042
Sub-Total 3705 000 4682 000 8387 000 11655 13650 33692
State 000 000 000 000 000 000 32200 3253 35453
Private 000 000 000 000 000 000 000 012 012
Central 4560 000 10969 000 15529 000 7227 000 22756
Sub-Total 4560 000 10969 000 15529 000 39427 3265 58221
State 000 000 16950 000 16950 000 000 1601 18551
Private 000 000 000 000 000 000 000 009 009
Central 5610 000 43695 000 49305 000 6849 500 56654
Sub-Total 5610 000 60645 000 66255 000 6849 2110 75214
State 000 000 000 3600 3600 000 000 545 4145
Private 000 000 000 000 000 000 000 344 344
Central 4710 000 7157 000 11867 000 9534 000 21401
Sub-Total 4710 000 7157 3600 15467 000 9534 889 25890
State 000 000 000 000 000 000 000 3067 3067
Private 000 000 000 000 000 000 000 100 100
Central 3210 000 4893 000 8103 000 5733 000 13836
Sub-Total 3210 000 4893 000 8103 000 5733 3167 17003
State 000 000 000 000 000 000 000 3647 3647
Private 000 000 000 000 000 000 000 050 050
Central 3105 000 4046 000 7151 000 9794 000 16945
Sub-Total 3105 000 4046 000 7151 000 9794 3697 20642
11250 000 6362 000 17612 000 14000 000 31612
State 000 000 49771 3600 53371 000 42200 23325 118895
Private 000 000 2450 000 2450 000 000 6104 8554
Central 77002 000 125360 000 202362 000 100500 3000 305862
Grand Total 77002 000 177581 3600 258183 000 142700 32429 433311
Assam
Arunachal Pradesh
Meghalaya
Tripura
Manipur
Nagaland
Mizoram
Central - Unallocated
Total (North-
Eastern Region)
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
NORTH-EASTERN REGION
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
State Ownership Sector
Mode wise breakup
Grand TotalThermalNuclear Hydro
RES
(MNRE)
(As on 30042019)
Coal Lignite Gas Diesel Total
State 000 000 000 4005 4005 000 000 525 4530
Private 000 000 000 000 000 000 000 663 663
Central 000 000 000 000 000 000 000 510 510
Sub-Total 000 000 000 4005 4005 000 000 1698 5703
State 000 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 000 075 075
Central 000 000 000 000 000 000 000 000 000
Sub-Total 000 000 000 000 000 000 000 075 075
State 000 000 000 4005 4005 000 000 525 4530
Private 000 000 000 000 000 000 000 738 738
Central 000 000 000 000 000 000 000 510 510
Grand Total 000 000 000 4005 4005 000 000 1773 5778
Andaman amp
Nicobar
Lakshadweep
Total (Islands)
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
ISLANDS
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
State Ownership Sector
Mode wise breakup
Grand TotalThermalNuclear Hydro
RES
(MNRE)
SrNo Contents Page
1 Executive summary of Target and Achievement of Transmission Lines during 2019-20
20(1)
2 List of Transmission Lines CommissionedReady for commissioning during Apr-2019 20(2)
Section C - Transmission Lines
1 Executive summary of Target and Achievement of Transmission Lines during 2019-20 As on 30-04-19
(All figures in circuit kms)
Ce
ntr
al S
ecto
r
Sta
te S
ecto
r
JV
Pri
va
te S
ecto
r
To
tal
Ce
ntr
al S
ecto
r
Sta
te S
ecto
r
JV
Pri
va
te S
ecto
r
To
tal
Ce
ntr
al S
ecto
r
Sta
te S
ecto
r
JV
Pri
va
te S
ecto
r
To
tal
Ce
ntr
al S
ecto
r
Sta
te S
ecto
r
JV
Pri
va
te S
ecto
r
To
tal
Ce
ntr
al S
ecto
r
Sta
te S
ecto
r
JV
Pri
va
te S
ecto
r
To
tal
Ce
ntr
al
Se
cto
r
Sta
te S
ec
tor
JV
Pri
va
te S
ec
tor
Gra
nd
To
tal
0 0 0 0 0 0 0 0 2727 958 2334 6019 2239 3416 1143 6798 781 10023 0 10804 5747 14397 3477 23621
Apr19 Programme 0 0 0 0 0 0 0 0 577 416 557 1550 60 890 203 1153 0 309 0 309 637 1615 760 3012
Achievement 0 0 0 0 0 0 0 0 53 0 0 53 0 20 0 20 0 401 0 401 53 421 0 474
Upto Apr-19 Programme 0 0 0 0 0 0 0 0 577 416 557 1550 60 890 203 1153 0 309 0 309 637 1615 760 3012
Achievement 0 0 0 0 0 0 0 0 53 0 0 53 0 20 0 20 0 401 0 401 53 421 0 474
20(1)
220 kV Grand Total 800 kV 500 kV
Programme 2019-20
Programme
Achievement
HVDC765 kV 400 kV
Line
1 2 3 4 5 6
1 400 Bhadla (PG) - Bhadla (RVPN) line DC PGCIL 53
53
2 400 LILO of one ckt Jhanor - Navsari at Vav Ss DC GETCO 20
3 220 Banda-Chitrakoot Line DC UPPTCL 226
4 220 Gorakhpur (PG)-Gola line DC UPPTCL 82
5 220 Hapur(765) - Faridnagar line SC UPPTCL 11
6 220 Kalikiri - Madanapalli line DC APTRANSCO 60
7 220LILO of Gr Noida -Noida Sec-129 at Noida
Sec-148DC UPPTCL 1
8 220LILO of one Ckt of Badshahpur Pali at Sec-
65 GurgaonDC HVPNL 3
9 220 Sultanpur-Sangipur LILO Section at Amethi DC UPPTCL 18
421
0
474
20(2)
Grand Total
2Transmission Lines (220 kV and above) CommissionedReady for commissioning During Apr-2019
Voltage
Level (kV)Name of Transmission Lines
Circuit
Type
Executing
Agency
CENTRAL SECTOR
Total of CENTRAL SECTOR
STATE SECTOR Sector
Total of STATE SECTOR
PRIVATE SECTOR
Total of PRIVATE SECTOR
SlNo
Length(CKm)
As on 30-04-19
SN Contents Page
1 Executive summary of Target and Achievement of Substations during 2019-20 21(1)
2Sub Stations (220 kV and above) commissionedready for commisssioning during Apr-
201921(2)
Section D - Sub Stations
1 Executive summary of Target and Achievement of Substations during 2019-2020 As on 30-04-19
(All figures in circuit MVA)
Ce
ntr
al S
ecto
r
Sta
te S
ecto
r
JV
Pri
va
te S
ecto
r
To
tal
Ce
ntr
al S
ecto
r
Sta
te S
ecto
r
JV
Pri
va
te S
ecto
r
To
tal
Ce
ntr
al S
ecto
r
Sta
te S
ecto
r
JV
Pri
va
te S
ecto
r
To
tal
Ce
ntr
al S
ecto
r
Sta
te S
ecto
r
JV
Pri
va
te S
ecto
r
To
tal
Ce
ntr
al S
ecto
r
Sta
te S
ecto
r
JV
Pri
va
te S
ecto
r
To
tal
Ce
ntr
al S
ec
tor
Sta
te S
ec
tor
JV
Pri
va
te S
ec
tor
Gra
nd
To
tal
3000 0 0 3000 0 0 0 0 18000 3000 6000 27000 5205 19665 4260 29130 800 21786 0 22586 27005 44451 10260 81716
Apr19 Programme 0 0 0 0 0 0 0 0 3000 0 3000 6000 0 1000 2000 3000 0 800 0 800 3000 1800 5000 9800
Achievement 0 0 0 0 0 0 0 0 500 0 0 500 815 1980 0 2795 0 1305 0 1305 1315 3285 0 4600
Upto Apr-19 Programme 0 0 0 0 0 0 0 0 3000 0 3000 6000 0 1000 2000 3000 0 800 0 800 3000 1800 5000 9800
Achievement 0 0 0 0 0 0 0 0 500 0 0 500 815 1980 0 2795 0 1305 0 1305 1315 3285 0 4600
21(1)
220 kV Grand Total 800 kV 500 kV
Programme 2019-20
Programme
Achievement
HVDC765 kV 400 kV
As on 30-04-19
Sl Voltage Ratio Capacity
No (kVkV) (MWMVA)
1 2 3 4 5
1 Bhadla SS (3x1500 3x500 MVA) 765400 PGCIL 500
2 Extn at Tumkur (Pavagada ) PS (2x500 MVA) 400220 PGCIL 500
3 Bongaigaon (2nd ICT) Ss 400220 PGCIL 315
Total of CENTRAL SECTOR 1315
4 Motiram Adda Gorakhpur (Aug) (Additional TF) 400220 UPPTCL 240
5 Muradnagar-II Ghaziabad (Aug) (Additional TF) 400220 UPPTCL 240
6 Noida Sec- 148 GBNagar (New) 400220 UPPTCL 5007 Sarnath Varanasi (Aug) TF- II (500-315) 400220 UPPTCL 1858 Sarojininagar Lucknow Aug) TF- II (500-315) 400220 UPPTCL 185
9 Unnao (Aug) TF-III 400220 UPPTCL 31510 Nawada SS 400220 HVPNL 31511 Kharepatan SS 22033 MSETCL 2512 Prathipadu SS 220132 APTRANSCO 10013 Pali Ss 22066 HVPNL 160
14 A-5 Faridabad Ss 22066 HVPNL 60
15 Rentachintala Ss Aug(3X100-2x100) 220132 APTRANSCO 10016 Amethi Ss 220132 UPPTCL 160
17 Gajokhar Varanasi (Aug) TF- II (160-100) 220132 UPPTCL 60
18 Gola Gorakhpur (New) 220132 UPPTCL 160
19 Khurja Bulandshahr (Aug) TF- II (200-160) 220132 UPPTCL 40
20 RC Green GB Nagar (Aug) TF-II (160-100) 220132 UPPTCL 60
21 Sikandrabad Bulandshahr (Aug) (Additional TF) 220132 UPPTCL 160
22 Sitapur (Aug) (Additional TF) 220132 UPPTCL 160
23 Sohawal Ayodhya (Aug) TF-II (160-100) 220132 UPPTCL 60
TOTAL STATE SECTOR 3285
GRAND TOTAL 4600
21(2)
CENTRAL SECTOR
STATE SECTOR
2Sub-Stations (220 kV and above) CommissionedReady for commissioning During Apr-2019
Name of Sub Stations Executing Agency
SN Contents Page
1 Electricity Generation (MU) Targets and Achievements for 2019-20 22
Section E - Electricity Generation
Programme Achievement Ach Programme Achievement Ach
Central Sector 37545100 3177900 3129530 9848 3177900 3129530 9848
State Sector 37498600 3322500 2950558 8881 3322500 2950558 8881
PvtIPP Sector 37346200 3236400 3195940 9875 3236400 3195940 9875
PvtUTL Sector 1823100 159300 165579 10394 159300 165579 10394
Total 114213000 9896100 9441607 9541 9896100 9441607 9541
Central Sector 5661700 386100 481390 12468 386100 481390 12468
State Sector 6680500 498200 536514 10769 498200 536514 10769
PvtIPP Sector 1206900 57300 80405 14032 57300 80405 14032
PvtUTL Sector 144100 12300 10930 8886 12300 10930 8886
Total 13693200 953900 1109239 11628 953900 1109239 11628
Central Sector 4472000 367300 317765 8651 367300 317765 8651
Total 4472000 367300 317765 8651 367300 317765 8651
Bhutan Import 621800 17500 24396 13941 17500 24396 13941
Central Sector 47678800 3931300 3928685 9993 3931300 3928685 9993
State Sector 44179100 3820700 3487072 9127 3820700 3487072 9127
Pvt Sector 40520300 3465300 3452854 9964 3465300 3452854 9964
Total 133000000 11234800 10893007 9696 11234800 10893007 9696
Provisional based on actual-cum-Assesment
Figs in MU
Cummulative
Achievement
Cummulative
Achievement
Mar-19 Mar-18 Upto Mar-2019 Upto Mar-2018
984785 869291 12675910 10183949
22
1 Electricity Generation (MU) Targets and Achievememts for 2019-20
All India Energy Generation During Apr-19 to Apr-19 (MU)
Target (2019-20)Apr-19 to Apr-19
Sector
Hydro
Thermal
Nuclear
Renewable Energy Generation
Achievement
Apr-2019
98961
95393673
112348
94416
11092
3178
108930
0
20000
40000
60000
80000
100000
120000
Thermal Hydro Nuclear Total
Programme
Achievement
SN Contents Page
1 Energy Power Supply Position (Provisional) for Apr-2019 and during Apr-19 to Apr-19 23
2 Peak Power Supply Position (Provisional) for Apr-2019 and during Apr-19 to Apr-19 24
3 Energy Power Supply Position (Revised) for Mar-2019 and during Apr-19 to Mar-19 25
4 Peak Power Supply Position (Revised) for Mar-2019 and during Apr-19 to Mar-19 26
5 Notified Power cuts Restrictions on Industries during Apr-2019 27
6 Power Supply to Agricultural Sector during Apr-2019 28
Section F - Power supply position
आकड़ मममलयन यननट नट Figures in MU net
ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied
कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )
चडीगढ़ Chandigarh 117 117 0 00 117 117 0 00
दिलली Delhi 2698 2698 1 00 2698 2698 1 00
हरियजणज Haryana 3773 3773 0 00 3773 3773 0 00
दहमजचल परिश Himachal Pradesh 777 777 0 00 777 777 0 00
रमम कशमीि Jammu amp Kashmir 1604 1296 308 192 1604 1296 308 192
परजब Punjab 3646 3646 0 00 3646 3646 0 00
िजरसथजन Rajasthan 6210 6208 2 00 6210 6208 2 00
उतति परिश Uttar Pradesh 10179 10148 32 03 10179 10148 32 03
उततिजखड Uttarakhand 1120 1120 0 00 1120 1120 0 00
उततरी कषतर Northern Region 30094 29786 308 10 30094 29786 308 10
छततीसगढ़ Chhattisgarh 2684 2676 8 03 2684 2676 8 03
गरिजत Gujarat 10718 10718 0 00 10718 10718 0 00
मधय परिश Madhya Pradesh 6006 6006 0 00 6006 6006 0 00
महजिजषटर Maharashtra 14308 14308 0 00 14308 14308 0 00
िमन औि दिउ Daman amp Diu 220 220 0 00 220 220 0 00
िजिि व नगि हवली Dadra amp Nagar Haveli 552 552 0 00 552 552 0 00
गोवज Goa 388 388 0 00 388 388 0 00
पशचिमी कषतर Western Region 34875 34868 8 00 34875 34868 8 00
आनधर परिश Andhra Pradesh 5708 5708 0 00 5708 5708 0 00
तलगजनज Telangana 5725 5725 0 00 5725 5725 0 00
कनजाटक Karnataka 7003 7003 0 00 7003 7003 0 00
किल Kerala 2402 2400 2 01 2402 2400 2 01
तममल नजड Tamil Nadu 10010 10010 0 00 10010 10010 0 00
पडचिी Puducherry 263 263 0 00 263 263 0 00
लकष-दवीप Lakshadweep 4 4 0 0 4 4 0 0
दकषकषणी कषतर Southern Region 31111 31109 2 00 31111 31109 2 00
बबहजि Bihar 2589 2589 0 00 2589 2589 0 00
िजमोिि घजटी ननगम DVC 1772 1772 0 00 1772 1772 0 00
झजिखणड Jharkhand 689 689 0 00 689 689 0 00
ओडडशज Odisha 2689 2689 1 00 2689 2689 1 00
पशशचम बगजल West Bengal 5075 5075 0 00 5075 5075 0 00
मसशककम Sikkim 37 37 0 00 37 37 0 00
अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 7 29 27 2 7
परवी कषतर Eastern Region 12851 12850 1 00 12851 12850 1 00
अरणजचल परिश Arunachal Pradesh 66 66 0 05 66 66 0 05
असम Assam 766 709 57 75 766 709 57 75
मणणपि Manipur 68 67 1 15 68 67 1 15
मघजलय Meghalaya 170 160 10 59 170 160 10 59
ममज़ोिम Mizoram 54 53 0 08 54 53 0 08
नजगजलड Nagaland 54 54 0 08 54 54 0 08
बिपिज Tripura 122 120 1 12 122 120 1 12
उततर-परवी कषतर North-Eastern Region 1300 1228 71 55 1300 1228 71 55
समपणण भारत All India 110231 109842 389 04 110231 109842 389 04
23
ऊरजा पनत ा म कमी ऊरजा पनत ा म कमीEnergy not Supplied
Excludes energy exported to Bangladesh
Energy not Supplied
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
ऊराण वरवदयत आपरत ण शथिरत ररपोरण (परवाणरवलोकन) Energy Power Supply Position Report (Provisional)
राजयState
अपरल 2019 April2019 अपरल2019 -अपरल2019 April2019 to April2019
अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met
कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )
चडीगढ़ Chandigarh 256 256 0 00 256 256 0 00
दिलली Delhi 5664 5664 0 00 5664 5664 0 00
हरियजणज Haryana 8127 8127 0 00 8127 8127 0 00
दहमजचल परिश Himachal Pradesh 1387 1387 0 00 1387 1387 0 00
रमम कशमीि Jammu amp Kashmir 2826 2261 565 200 2826 2261 565 200
परजब Punjab 7015 7015 0 00 7015 7015 0 00
िजरसथजन Rajasthan 10560 10560 0 00 10560 10560 0 00
उतति परिश Uttar Pradesh 19935 19935 0 00 19935 19935 0 00
उततिजखड Uttarakhand 1922 1922 0 00 1922 1922 0 00
उततरी कषतर Northern Region 54476 53985 491 09 54476 53985 491 09
छततीसगढ़ Chhattisgarh 4596 4574 22 05 4596 4574 22 05
गरिजत Gujarat 17871 17865 6 00 17871 17865 6 00
मधय परिश Madhya Pradesh 10018 10018 0 00 10018 10018 0 00
महजिजषटर Maharashtra 23158 23150 8 00 23158 23150 8 00
िमन औि दिउ Daman amp Diu 341 340 1 02 341 340 1 02
िजिि व नगि हवली Dadra amp Nagar Haveli 818 818 0 00 818 818 0 00
गोवज Goa 594 594 0 00 594 594 0 00
पशचिमी कषतर Western Region 56242 56222 20 00 56242 56222 20 00
आनधर परिश Andhra Pradesh 9151 9151 0 00 9151 9151 0 00
तलगजनज Telangana 10191 10191 0 00 10191 10191 0 00
कनजाटक Karnataka 12681 12681 0 00 12681 12681 0 00
किल Kerala 4309 4300 8 02 4309 4300 8 02
तममल नजड Tamil Nadu 15972 15972 0 00 15972 15972 0 00
पडचिी Puducherry 482 480 2 05 482 480 2 05
लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0
दकषकषणी कषतर Southern Region 49155 49103 52 01 49155 49103 52 01
बबहजि Bihar 5357 5357 0 00 5357 5357 0 00
िजमोिि घजटी ननगम DVC 3039 3039 0 00 3039 3039 0 00
झजिखणड Jharkhand 1266 1266 0 00 1266 1266 0 00
ओडडशज Odisha 5389 5389 0 00 5389 5389 0 00
पशशचम बगजल West Bengal 8666 8666 0 00 8666 8666 0 00
मसशककम Sikkim 100 100 0 00 100 100 0 00
अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7
परवी कषतर Eastern Region 23349 23349 0 00 23349 23349 0 00
अरणजचल परिश Arunachal Pradesh 139 136 3 22 139 136 3 22
असम Assam 1712 1667 45 26 1712 1667 45 26
मणणपि Manipur 197 188 9 46 197 188 9 46
मघजलय Meghalaya 336 336 0 00 336 336 0 00
ममज़ोिम Mizoram 116 113 3 26 116 113 3 26
नजगजलड Nagaland 157 131 26 166 157 131 26 166
बिपिज Tripura 292 291 1 03 292 291 1 03
उततर-परवी कषतर North-Eastern Region 2848 2780 68 24 2848 2780 68 24
समपणण भारत All India 177411 176810 601 03 177411 176810 601 03
24
मजग की पनत ा म कमी Demand not Met
Excludes the supply to Bangladesh
राजयStateअपरल 2019 April2019
मजग की पनत ा म कमी Demand not Met
अधिकतम वरवदयत आपरत ण शथिरत ररपोरण (परवाणरवलोकन) Peak Power Supply Position Report (Provisional)
आकड़ मगज वजट नट Figures in MW netअपरल2019 -अपरल2019 April2019 to April2019
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
आकड़ मममलयन यननट नट Figures in MU net
ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied
कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )
चडीगढ़ Chandigarh 96 96 0 00 1561 1561 0 00
दिलली Delhi 1931 1930 1 00 32299 32282 17 01
हरियजणज Haryana 3658 3658 0 00 53665 53665 0 00
दहमजचल परिश Himachal Pradesh 832 830 2 02 9850 9618 232 24
रमम कशमीि Jammu amp Kashmir 1767 1414 353 200 19593 15868 3725 190
परजब Punjab 3585 3585 0 00 55288 55275 13 00
िजरसथजन Rajasthan 6774 6770 4 01 79826 79637 189 02
उतति परिश Uttar Pradesh 8754 8691 63 07 117101 116118 984 08
उततिजखड Uttarakhand 1067 1067 0 00 13845 13753 92 07
उततरी कषतर Northern Region 28464 28041 423 15 383028 377776 5251 14
छततीसगढ़ Chhattisgarh 2464 2457 8 03 26130 26076 54 02
गरिजत Gujarat 9890 9890 0 00 116588 116572 15 00
मधय परिश Madhya Pradesh 6236 6236 0 00 75667 75665 2 00
महजिजषटर Maharashtra 13631 13631 0 00 158285 158148 137 01
िमन औि दिउ Daman amp Diu 221 221 0 00 2557 2557 0 00
िजिि व नगि हवली Dadra amp Nagar Haveli 553 553 0 00 6317 6317 0 00
गोवज Goa 362 362 0 00 4283 4280 3 01
पशचिमी कषतर Western Region 33357 33349 8 00 389827 389615 212 01
आनधर परिश Andhra Pradesh 6072 6071 1 00 63735 63677 58 01
तलगजनज Telangana 6930 6929 1 00 66697 66635 62 01
कनजाटक Karnataka 7614 7612 1 00 71759 71690 69 01
किल Kerala 2489 2488 1 00 25029 24911 118 05
तममल नजड Tamil Nadu 10247 10245 2 00 109375 109273 102 01
पडचिी Puducherry 252 251 1 04 2761 2751 10 03
लकष-दवीप Lakshadweep 4 4 0 0 46 46 0 0
दकषकषणी कषतर Southern Region 33605 33597 8 00 339355 338938 417 01
बबहजि Bihar 2319 2318 1 00 30052 29827 225 07
िजमोिि घजटी ननगम DVC 1773 1772 1 00 22365 21995 369 17
झजिखणड Jharkhand 698 697 1 01 8682 8461 221 25
ओडडशज Odisha 2583 2582 1 00 31810 31781 30 01
पशशचम बगजल West Bengal 4585 4584 2 00 52237 52078 159 03
मसशककम Sikkim 41 41 0 00 513 512 0 01
अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 67 346 323 23 67
परवी कषतर Eastern Region 11999 11995 5 00 145658 144654 1004 07
अरणजचल परिश Arunachal Pradesh 61 60 0 06 864 855 9 10
असम Assam 680 656 23 34 9532 9204 328 34
मणणपि Manipur 68 68 1 09 916 906 10 11
मघजलय Meghalaya 173 173 0 03 1955 1953 1 01
ममज़ोिम Mizoram 50 49 0 09 668 661 8 12
नजगजलड Nagaland 58 57 1 20 902 809 93 103
बिपिज Tripura 150 150 0 00 1859 1837 21 11
उततर-परवी कषतर North-Eastern Region 1240 1214 26 21 16696 16225 471 28
समपणण भारत All India 108665 108196 469 04 1274564 1267209 7355 06
Note The revised data for March 2019 is not avaliable
Excludes energy exported to Bangladesh
राजयState
ऊराण वरवदयत आपरत ण शथिरत ररपोरण (परवाणरवलोकन) Energy Power Supply Position Report (Provisional)
25
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
Energy not Supplied Energy not Supplied
मािण2019 March2019 अपरल2018 -मािण2019 April2018 to March2019
ऊरजा पनत ा म कमी ऊरजा पनत ा म कमी
अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met
कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )
चडीगढ़ Chandigarh 223 223 0 00 369 369 0 00
दिलली Delhi 4016 4016 0 00 7016 7016 0 00
हरियजणज Haryana 6544 6544 0 00 10270 10270 0 00
दहमजचल परिश Himachal Pradesh 1683 1683 0 00 1700 1700 0 00
रमम कशमीि Jammu amp Kashmir 3277 2622 655 200 3277 2622 655 200
परजब Punjab 6564 6564 0 00 12638 12638 0 00
िजरसथजन Rajasthan 11885 11885 0 00 13276 13276 0 00
उतति परिश Uttar Pradesh 16220 16220 0 00 20498 20062 436 21
उततिजखड Uttarakhand 2002 2002 0 00 2216 2216 0 00
उततरी कषतर Northern Region 47925 47356 569 12 63166 61726 1440 23
छततीसगढ़ Chhattisgarh 4444 4128 316 71 4444 4270 174 39
गरिजत Gujarat 16263 16263 0 00 17053 16963 90 05
मधय परिश Madhya Pradesh 12328 12323 5 00 13815 13815 0 00
महजिजषटर Maharashtra 22361 22291 70 03 23864 23254 610 26
िमन औि दिउ Daman amp Diu 336 336 0 01 357 356 1 02
िजिि व नगि हवली Dadra amp Nagar Haveli 800 799 1 01 816 815 1 01
गोवज Goa 538 538 0 00 596 596 0 00
पशचिमी कषतर Western Region 53132 52965 167 03 56675 55821 853 15
आनधर परिश Andhra Pradesh 8977 8977 0 00 9459 9453 6 01
तलगजनज Telangana 10471 10471 0 00 10815 10815 0 00
कनजाटक Karnataka 12841 12841 0 00 12841 12841 0 00
किल Kerala 4264 4228 36 09 4264 4228 36 09
तममल नजड Tamil Nadu 15712 15712 0 00 15712 15712 0 00
पडचिी Puducherry 427 412 15 34 427 412 15 34
लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0
दकषकषणी कषतर Southern Region 49464 49464 0 00 49464 49464 0 00
बबहजि Bihar 4633 4633 0 00 5115 5084 31 06
िजमोिि घजटी ननगम DVC 3035 3035 0 00 3035 3035 0 00
झजिखणड Jharkhand 1210 1210 0 00 1339 1291 48 36
ओडडशज Odisha 4827 4827 0 00 5357 5357 0 00
पशशचम बगजल West Bengal 8287 8287 0 00 9130 9123 7 01
मसशककम Sikkim 100 100 0 00 106 106 0 00
अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7
परवी कषतर Eastern Region 21658 21658 0 00 23141 22733 408 18
अरणजचल परिश Arunachal Pradesh 133 131 2 15 138 138 0 01
असम Assam 1539 1508 31 20 1865 1809 56 30
मणणपि Manipur 204 199 5 25 219 216 3 12
मघजलय Meghalaya 357 357 0 00 374 372 1 04
ममज़ोिम Mizoram 108 105 3 28 121 119 2 17
नजगजलड Nagaland 127 125 2 16 156 138 18 116
बिपिज Tripura 249 249 0 00 298 293 5 17
उततर-परवी कषतर North-Eastern Region 2540 2535 5 02 2967 2850 117 39
समपणण भारत All India 169464 168745 719 04 177022 175528 1494 08
Note The revised data for March 2019 is not avaliable 26
अधिकतम वरवदयत आपरत ण शथिरत ररपोरण (परवाणरवलोकन) Peak Power Supply Position Report (Provisional)
आकड़ मगज वजट नट Figures in MW net
राजयStateमािण2019 March2019 अपरल2018 -मािण2019 April2018 to March2019
मजग की पनत ा म कमी मजग की पनत ा म कमी Demand not MetDemand not Met
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
Excludes the supply to Bangladesh
अपरल 2019 April2019 अपरल2018 -मािण2019 April2019 to April2019
उततरी कषतर Northern Region
चडीगढ़ Chandigarh(Data Not Received)दिलली Delhi
हरियजणज Haryana
दहमजचल परिश Himachal Pradeshरमम कशमीि Jammu amp Kashmir(Data
Not Received)परजब Punjab
िजरसथजन Rajasthanउतति परिश Uttar Pradesh
उततिजखड Uttarakhand
पशचिमी कषतर Western Region
छततीसगढ़ Chhattisgarh
Apr-Nov 2018- No cuts
Maximum Demand cut-58MW
Energy cut- 00020-00032 MUsday
गरिजत Gujarat
मधय परिश Madhya Pradesh
महजिजषटर Maharashtra
गोवज Goa
दकषकषणी कषतर Southern Region
आनधर परिश Andhra Pradesh
तलगजनज Telangana
कनजाटक Karnataka
किल Kerala
तममल नजड Tamil Nadu
पडचिी Puducherryपरवी कषतर Eastern Region
बबहजि Bihar
झजिखणड Jharkhand
ओडडशज Odisha
पशशचम बगजल West Bengal
No N
otifie
d Cu
ts
27
मािण 2019 म इडथरीर पर वरवदयत करौती का वरवरवरण Notified Power CutsRestrictions on Industries during April2019
राजय कषतर State Regionऊराणमाग करौती EnergyDemand Cut
No N
otifie
d Cu
tsNo
Notifie
d Cu
ts
अपरल2019 April 2019 अपरल2019 -अपरल2019 April2019 to April2019
उततरी कषतर Northern Region
चडीगढ़ Chandigarh Data not received Data not received
दिलली Delhi Data not received Data not received
हरियजणज Haryana 0811 hrsday 0811 hrsday
दहमजचल परिश Himachal Pradesh HPSEBL has only 2 agriculture consumers and uninterrupted
power is being supplied to agriculture sector
HPSEBL has only 2 agriculture consumers and uninterrupted
power is being supplied to agriculture sector
रमम कशमीि Jammu amp Kashmir Data not received Data not received
परजब Punjab 379 hrsday 379 hrsday
िजरसथजन Rajasthan 0630 hrsday 0630 hrsday
उतति परिश Uttar Pradesh 2157 hrsday 2157 hrsday
उततिजखड Uttarakhand 2359 hrsday 2359 hrsday
पशचिमी कषतर Western Region
छततीसगढ़ Chhattisgarh 18 hrsday 18 hrsday
गरिजत Gujarat 8 hrsday 8 hrsday
मधय परिश Madhya Pradesh Three-Phase Supply(Irrigation)- 0953 hrs day Three-Phase
(Mixed) Supply - 2334 hrs day
Three-Phase Supply(Irrigation)- 0953 hrs day Three-Phase
(Mixed) Supply - 2334 hrs day
महजिजषटर Maharashtra Three-Phase Supply(Irrigation)- 9 hrs day Three-Phase Supply(Irrigation)- 9 hrs day
गोवज Goa No restriction No restriction
दकषकषणी कषतर Southern Region
आनधर परिश Andhra Pradesh 07 hrsday 07 hrsday
तलगजनज Telangana 24 hrsday 24 hrsday
कनजाटक Karnataka 6 hrsday 6 hrsday
किल Kerala No Restrictions No Restrictions
तममल नजड Tamil Nadu 9 hrsday (6 hrs during day time and 3 hrs during night time) 9 hrsday (6 hrs during day time and 3 hrs during night time)
पडचिी Puducherry No Restrictions No Restrictions
परवी कषतर Eastern Region
बबहजि Bihar 18 hrsday 18 hrsday
झजिखणड Jharkhand 20 hrsday 20 hrsday
ओडडशज Odisha 24 hrsday 24 hrsday
पशशचम बगजल West Bengal 23 hrsday 23 hrsday
28
मारच 2019 कषि कषतर को षिदयत आपरतच का षििरण Power Supply to Agricultural Sector during March2019
राजय कषतर State Regionऔसत वरवदयत आपरत ण घनरो म Average Hours of Supply
On segregated feeders
SNo Contents Page
1 Growth of Installed Capacity since 6th Plan 29
2 Progress of Transmission Sector since 6th Plan 30
3 All India Yearly Coal consumption for Power Generation (Utilities)
4 All India Annual Per Capita Consumption of Electricity since -2006
5 Average cost of power supply amp Average realisation (Paisakwh)
6 Growth of Rural Electrification amp Pump Sets Energisation
7 Status of Hydro Schemes Cleared by the CEA in Apr-2019
Section G - Growth of Power Sector
31
32
(In MW)
Coal Gas Diesel Total
End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472
End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634
End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537
End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596
End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921
End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703
End of 12th Plan 19216288 2532938 83763 21832988 6780 4447842 50018 31960630
Up to Apr-2019 20070450 2493722 63763 22627934 678000 4539922 7764163 35610019
Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-17) = 51529 MW
Electricity Generation (MU) Targets and Achievements for 2016-17
Coal Gas Diesel Nuclear Hydro Res Total
2007045 2493722 637629 678000 453992 77641625 22925174
29
1 Growth of Installed Capacity Since 6th Plan
Plan YearThermal
Nuclear Hydro RES (MNRE) Total
2007045
2493722637629
678000
4539922
77641625
Total Installed Capacity 35610019 MW
Coal Gas Diesel Nuclear Hydro Res
Progress of Transmission Sector in the Country up to April 2019
1 TRANSMISSION LINES (All fig in CKM)
At the end of
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
6th plan 0 0 0 0 0 0 0 0 0 0 0 0 1831 4198 0 6029 1641 44364 0 46005 3472 48562 0 52034
7th plan 0 0 0 0 0 0 0 0 0 0 0 0 13068 6756 0 19824 4560 55071 0 59631 17628 61827 0 79455
8th plan 0 0 0 0 1634 0 0 1634 0 0 0 0 23001 13141 0 36142 6564 73036 0 79600 31199 86177 0 117376
9th plan 0 0 0 0 3234 1504 0 4738 751 409 0 1160 29345 20033 0 49378 8687 88306 0 96993 42017 110252 0 152269
10th plan 0 0 0 0 4368 1504 0 5872 1775 409 0 2184 48708 24730 0 73438 9444 105185 0 114629 64295 131828 0 196123
11th Plan 0 0 0 0 5948 1504 1980 9432 4839 411 0 5250 71023 30191 5605 106819 10140 125010 830 135980 91950 157116 8415 257481
12th Plan 6124 0 0 6124 5948 1504 1980 9432 25465 1177 4598 31240 92482 48240 17065 157787 11014 151276 978 163268 141033 202197 24621 367851
13th Plan (Up
to Mar2019)6124 0 0 6124 5948 1504 1980 9432 33692 1512 6605 41809 101335 58238 21173 180746 11734 162552 1010 175296 158833 223806 30768 413407
13th Plan (Up
to Apr-19)6124 0 0 6124 5948 1504 1980 9432 33745 1512 6605 41862 101335 58258 21173 180766 11734 162953 1010 175697 158886 224227 30768 413881
27150 600 MW of 132 kV Inter-Regional power transmission capacity links which are operated radially from time to time is not added in the total
75050
47900
24000
99050
30
Grand Total
Note - The figure upto the end of 10th plan in for stringing progress including the lines not commissioned Now only commissioned lines are reckoned Accordingly the figure for 10th plan (end) may read
as 187555 after adjusting with (-) 10852 Ckm
Inter-regional Power Transfer Capacity (MW)
plusmn 800 kV HVDC plusmn 500 kV HVDC 765 kV 400 kV 220 kV
IR addition in 12th
Plan (up to March
2017)
Inter-regional
Transmission
Capacity at the end
of Plan Period 2017-
22 (as on April19)
IR at the end of 11th
PlanIR at the end of 12th
Plan
IR Capacity Addition
at the end of Plan
Period 2017-22 (Till
April 19)
2004-05 27800
2005-06 28100
2006-07 30200
2007-08 33000
2008-09 35500
2009-10 36700
2010-11 38700
2011-12 41756
2012-13 45460
2013-14 48940
2014-15 53040
2015-16 54590
2016-17 57430
2017-18 60800
2018-19 62890
Year
2005-06
2006-07
2007-08
2008-09
2009-10
2010-11
2011-12
2012-13
2013-14
2014-15
2015-16
2016-17
2017-18
2018-19
2004-05 254 209 7568
2005-06 260 221 7636
2006-07 276 227 7423
2007-08 293 239 7727
2008-09 340 263 8713
2009-10 355 268 8870
2010-11 398 303 11975
2011-12 455 330 13514
2012-13 501 376 14867
2013-14 518 175
2014-15 520
Source- PFC Reports on the performance of State Power Utilities 31
1181
7335
7786
91441
8188
88363
957
1010
1075
1122
1149
(GrossGen+ Net Import) Mid-year population Provisional
5 Average cost of power supply amp average realization ( paiseKWH )
Yearcost of supply
(paiseunit)
Realization(paiseunit)
Including AgricultureOnly
Agriculture
6719
7171
3 All India yearly Coal Consumption for Power Generation (Utilities)
YEARCoal Consumption
Million Tonnes
4 All India Annual per Capita consumption of Electricity Since 2006
Per Capita Consumption ( kWh)
6314
Sl
NoExecuting Agency
Installed
Capacity (MW)Cost (Rs crore)
Date of
Clearance
32
Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as
Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received
from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made
available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified
villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is
independent of the earlier published reports
No Hydro Electric Project has been issued concurrenceAppraisal letter by CEA during April 2019
7 Status of Hydro Schemes Cleared by the CEA in Apr-2019
Name of Scheme
1999-002000-01
297594
010408 to 310309010409 to 310310
10th Plan
2005-062006-07
322968331020
6 Growth Of Rural Electrification amp Pumpsets Energisation
Plan Year
9th Plan2002-03
134092626
4111
Pump Sets Energised Villages Electricfied (Nos)
2001-02
284064367244
1218
27801997-981998-99
3207
482864
12632
1576036
4451722594
15455554
2314176
397343611750
2093311060316074
65109527813884
46708
18423975
499150
2003-042004-05
5743
9769
Cumu upto End of 10th Plan
010407 to 310308
010410 to 310311557976840909
010411 to 310312
412667
86293726
No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification
since 2004-05
65291374575 296361511th Plan
Cumu upto End of 11th Plan
596556 21212860
557439Cummulative up to end of 12th Plan
SN Contents Page
1 Rate of sale of power for the year 2016-17 33-41
RATE OF SALE OF POWER FOR THE YEAR 2016-17
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) NORTHERN REGION
CENTRAL SECTOR
BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 18000 66900 19800
CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 54000 222400 21600
CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 30000 144400 19600
CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 23100 91700 42600
PARBATI - III HPS NHPC LTD HYDRO-HYDRO 52000 68200 54800
DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 28000 95600 30000
CHUTAK NHPC LTD HYDRO-HYDRO 4400 22000 79800
DULHASTI HPS NHPC LTD HYDRO-HYDRO 39000 228000 56400
SALAL HPS NHPC LTD HYDRO-HYDRO 69000 342300 11000
TANAKPUR HPS NHPC LTD HYDRO-HYDRO 9420 43000 29600
URI HPS -I NHPC LTD HYDRO-HYDRO 48000 280300 16000
URI HPS - II NHPC LTD HYDRO-HYDRO 24000 147300 48600
NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 4500 24600 88200
SEWA - II NHPC LTD HYDRO-HYDRO 12000 47100 43400
ANTA CCPP NTPC LTD THERMAL-GASN 41930 67539 32400
AURAIYA CCPP NTPC LTD THERMAL-GASN 66336 53501 39100
BADARPUR TPS NTPC LTD THERMAL-COAL 70500 159153 44800
DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 84000 296170 42300
DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 98000 526686 46300
DADRI CCPP NTPC LTD THERMAL-GASHSD 82978 227469 33000
FARIDABAD CCPP NTPC LTD THERMAL-GASN 43159 115577 30800
RIHAND STPS I NTPC LTD THERMAL-COAL 100000 596766 24500
RIHAND STPS II NTPC LTD THERMAL-COAL 100000 737069 24600
RIHAND STPS III NTPC LTD THERMAL-COAL 100000 706546 30600
SINGRAULI STPS NTPC LTD THERMAL-COAL 200000 1394068 20400
TANDA TPS NTPC LTD THERMAL-COAL 44000 295438 40800
UNCHAHAR TPS I NTPC LTD THERMAL-COAL 42000 256454 39800
UNCHAHAR TPS II NTPC LTD THERMAL-COAL 42000 273577 38900
UNCHAHAR TPS III NTPC LTD THERMAL-COAL 21000 142780 43000
KOLDAM NTPC LTD HYDRO-HYDRO 80000 363260 43600
NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 303575 25841
RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 108000 668677 35374
NJHPS SJVNL HYDRO-HYDRO 150000 699496 23820
RAMPUR HPS SJVNL HYDRO-HYDRO 41202 195982 32260
TEHRI HPP THDC HYDRO-HYDRO 100000 272543 51800
KOTESHWAR HEP THDC HYDRO-HYDRO 40000 106244 53400
IGSTPS JHAJJAR ARAVALI P CPL THERMAL-COAL 150000 510429 49490
NEYVELI BARSINGSAR NEYVELI LIG CORP LTD THERMAL-LIG 25000 127520 38040
STATE SECTOR
PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 21000 14222 48200
PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 21000 19205 48400
PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 25000 102257 42600
PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 25000 62107 41800
DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 60000 312213 41000
RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 120000 35767442200
WYC HYDEL STATION HPGCL HYDRO-HYDRO 6240 20365 24900
GIRI POWER HOUSE HPSEB HYDRO-HYDRO 6000 13958 7600
ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 1695 5467 11900
BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 12000 18528 6700
GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 2250 7462 22500
BASSI POWER HOUSE HPSEB HYDRO-HYDRO 6600 29649 7500
BINWA POWER HOUSE HPSEB HYDRO-HYDRO 600 2749 19300
ANNEXURE-I
RATE OF SALE OF POWER FOR THE YEAR 2016-2017
Page 33
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) GAJ POWER HOUSE HPSEB HYDRO-HYDRO 1050 2914 26700
BANER POWER HOUSE HPSEB HYDRO-HYDRO 1200 2864 16200
HOLI POWER HOUSE HPSEB HYDRO-HYDRO 300 616 22500
THIROT POWER HOUSE HPSEB HYDRO-HYDRO 450 1126 22500
KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 1200 3064 22500
LARJI POWER HOUSE HPSEB HYDRO-HYDRO 12600 53677 23700
NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 250 750 31000
CHABA POWER HOUSE HPSEB HYDRO-HYDRO 175 465 23300
RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 150 101 13400
SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 200 000 22500
KILLAR HPSEB HYDRO-HYDRO 030 050 22500
BHABA AUGUMENP H HPSEB HYDRO-HYDRO 450 1276 22500
BS CHAMBA HPSEB HYDRO-HYDRO 045 099 19500
GUMMA HPSEB HYDRO-HYDRO 300 423 22500
GAS TURBINE POWER STATION IPGCL THERMAL-GAS 27000 67233 39300
PPS-I PPCL THERMAL-GAS 33000 175905 38300
PPS-III PPCL THERMAL-GAS 137120 196879 36100
LOWER JHELUM JampKPDD HYDRO-HYDRO 10500 60214 5100
UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 2260 10514 6300
UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 10500 44202 8500
GANDHARBAL JampKPDD HYDRO-HYDRO 1500 8925 4700
KARNAH MPH JampKPDD HYDRO-HYDRO 200 1122 31000
CHENANI I JampKPDD HYDRO-HYDRO 2330 10892 6600
CHENANI II JampKPDD HYDRO-HYDRO 200 1188 9300
CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 750 3634 14200
IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 375 2108 18500
IGO MERCHELLONG JampKPDD HYDRO-HYDRO 300 1572 29700
PAHALGAM MHP JampKPDD HYDRO-HYDRO 450 1713 32900
MARPACHOO JampKPDD HYDRO-HYDRO 075 375 29800
HAFTAL JampKPDD HYDRO-HYDRO 100 483 28700
SANJAK JampKPDD HYDRO-HYDRO 126 441 36000
SEWA-III JampKPDD HYDRO-HYDRO 900 3273 20200
BHADERWAH JampKPDD HYDRO-HYDRO 150 935 8900
BAZGO JampKPDD HYDRO-HYDRO 030 108 33300
SUMOOR JampKPDD HYDRO-HYDRO 010 045 35400
HUNDER JampKPDD HYDRO-HYDRO 040 176 26200
STAKNA JampKPDD HYDRO-HYDRO 400 1933 4100
KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 124000 662879 31360
SURATGARH TPS RRVUNL THERMAL-COAL 150000 402328 41730
CHHABRA TPS 1amp 2 RRVUNL THERMAL-COAL 50000 305946 36700
CHHABRA TPS 3 RRVUNL THERMAL-COAL 25000 151536 36700
CHHABRA TPS 4 RRVUNL THERMAL-COAL 25000 155896 36700
RAMGARH GT POWER PROJECT RRVUNL THERMAL-COAL 22050 43177 41800
RAMGARH GAS T P PROJECT 3 RRVUNL THERMAL-GAS 5000 93615 41800
DHOLPUR C C POWER PROJECT RRVUNL THERMAL-R-LNG 33000 9486 46110
MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 14000 20855 34192
MINI MICRO HYDEL (MMH) P S RRVUNL HYDRO-HYDRO 2385 851 37800
KALISINDH TPP 1 RRVUNL THERMAL-COAL 60000 341543 45000
KALISINDH TPP 2 RRVUNL THERMAL-COAL 60000 211588 45000
KHARA HEP UPJVNL HYDRO-HYDRO 7200 26654 7200
MATATILLA HEP UPJVNL HYDRO-HYDRO 3060 12219 6500
OBRA HEP UPJVNL HYDRO-HYDRO 9900 21517 6300
RIHAND UPJVNL HYDRO-HYDRO 30000 57369 5500
ANPARA A TPS UPRVUNL THERMAL-COAL 63000 317536 27000
ANPARA B TPS UPRVUNL THERMAL-COAL 100000 705605 22700
ANPARA D UPRVUNL THERMAL-COAL 100000 300158 39800
HARDUAGANJ TPS UPRVUNL THERMAL-COAL 16500 45817 49200
HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 50000 304389 46600
OBRA A TPS UPRVUNL THERMAL-COAL 28800 13158 34000
OBRA B TPS UPRVUNL THERMAL-COAL 100000 328124 21900
Page 34
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) PANKI TPS UPRVUNL THERMAL-COAL 21000 66488 50300
PARICHHA TPS UPRVUNL THERMAL-COAL 22000 38762 49400
PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 42000 231931 45600
PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 50000 276722 50400
CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 24000 70845 8290
CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 14400 75366 8390
DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 3375 9595 12080
DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 5100 18701 10520
KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4140 17359 12330
KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 12000 33001 9420
KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 3000 11953 8320
TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 9000 33983 12460
MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 30400 124510 16110
RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 19800 17897 10550
MPUR UTTARAKHAND JVNL HYDRO-HYDRO 930 5121 19200
PATHRI UTTARAKHAND JVNL HYDRO-HYDRO 2040 11636 14200
GALOGI UTTARAKHAND JVNL HYDRO-HYDRO 300 648 12500
PRIVATE SECTOR
MGTPP CLP INDIA PVT LTD THERMAL-COAL 132000 268902 41940
SHRINAGAR HEP ALAKNANDA HPCL HYDRO-HYDRO 33000 127414 48800
GAMA INFRAPROP CCPP GAMA INFRAPROP PVT THERMAL-GAS 22500 52686 47000
PPGCL (BARA) JP POWER VENTURES LTD THERMAL-COAL 198000 448200 38500
MALANA HEP MALANA PCL HYDRO-HYDRO 8600 26354 29792
MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 10000 30369 32580
ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 19200 56347 36079
KASHANG HEP H P PCL HYDRO-HYDRO 19500 5034 29200
BASPA-II HEP HBPCL HYDRO-HYDRO 30000 132769 13600
KARCHAM WANGTOO HEP HBPCL HYDRO-HYDRO 100000 434386 36600
RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 108000 582600 43700
RITHALA COMBI CY POWER PLANT TATA POWER DDL THERMAL-GAS 9480 000 11900
RAJPURA TPS NABHA POWER LTD THERMAL-GAS 140000 901484 39000
TALWANDI SABO POWER LTD TALWANDI SABO POWER LTD THERMAL-COAL 198000 636040 49548
ROJA THERMAL POWER STATION ROJA POWER SCL THERMAL-COAL 120000 727200 43400
KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 34400 63400
BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 36000 62600
MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 38200 60800
UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 37900 61500
KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 42300 58800
LALITPUR PGCL BAJAJ ENERGY PVT LTD THERMAL-COAL 198000 359400 47300
PRAYAGRAJ PGCL PRAYAGRAJ PGCL THERMAL-COAL 132000 448200 38595
KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 132000 783182 33438
WESTERN REGION
CENTRAL SECTOR
INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 100000 325333 23892
OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 52000 141663 34001
GANDHAR CCPP NTPC LTD THERMAL-GAS 65739 221924 28700
KAWAS CCPP NTPC LTD THERMAL-GASN 65620 167929 27000
KORBA I amp II NTPC LTD THERMAL-COAL 210000 1499171 20500
KORBA III NTPC LTD THERMAL-COAL 50000 358746 26600
SIPAT STPS I NTPC LTD THERMAL-COAL 198000 1479902 26800
SIPAT STPS II NTPC LTD THERMAL-COAL 100000 766549 26500
VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 126000 693142 25800
VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 100000 608781 23800
VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 100000 673475 27600
VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 100000 655924 32900
VINDHYACHAL STPS V NTPC LTD THERMAL-COAL 50000 328265 31700
MOUDA I NTPC LTD THERMAL-COAL 100000 343130 44500
MOUDA Ii NTPC LTD THERMAL-COAL 66000 40637 39900
RATNAGIRI GAS amp POWER PVT LTD RGPPL THERMAL-GAS 196708 442485 47000
KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 000 24729
TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 32000 201227 10740
Page 35
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 365122 19069
TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 787444 29324
STATE SECTOR
GSEG-HAZIRA15610 MW GUJARAT S ENEGEN LTD THERMAL-GAS 15610 1805 28200
GSEG-HAZIRA35143 MW GUJARAT S ENEGEN LTD THERMAL-GAS 35130 22276 51300
GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 21978 51800
AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 13929 26100
KORBA TPS EAST CSPGCL THERMAL-COAL 44000 198673 33880
DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 365808 27570
KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 316500 30420
HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 532878 19410
CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 515 58300
MTTPS CHAMPA U-I CSPGCL THERMAL-COAL 50000 220376 39000
MTTPS CHAMPA U-II CSPGCL THERMAL-COAL 50000 23709 10000
SHP GANGREL CSPGCL HYDRO-HYDRO 1000 2350 36790
BANGO HEP CSPGCL HYDRO-HYDRO 12000 14662 8900
MHP KORBA WEST CSPGCL HYDRO-HYDRO 170 859 38190
SIKASAR HEP CSPGCL HYDRO-HYDRO 700 418 26870
DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8843 74500
DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 19446 51500
GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 66388 71600
GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127488 41300
KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 96072 43900
KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 29841 56400
SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 184966 58800
UKAI 1-5 GSECL THERMAL-COAL 85000 204891 46900
UKAI TPS 6 GSECL THERMAL-COAL 50000 284448 48200
WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 271999 58300
WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 82808 44100
KADANA HPS GSECL HYDRO-HYDRO 24200 34433 16800
UKAI HPS GSECL HYDRO-HYDRO 30500 40585 6100
TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 123000 11500
BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 8900 10900
BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 7200 27500
JHINNA HPS MPPGCL HYDRO-HYDRO 2000 9700 18500
RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 44300 3400
GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 17300 4600
SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 4100 16900
MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 14600 27000
PENCH HPS MPPGCL HYDRO-HYDRO 16000 23700 8100
RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 3000 16900
AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 134400 35100
SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 283800 38700
SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 344600 34300
SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 111600 61600
SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 211800 58000
SSTPS PH-I MPPGCL THERMAL-COAL 120000 233100 84300
BHUSAWAL TPS MSPGCL THERMAL-COAL 142000 566258 51100
CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1365682 33700
KHAPERKHEDA MSPGCL THERMAL-COAL 134000 706207 39100
KORADI TPS MSPGCL THERMAL-COAL 62000 443206 42000
NASIK TPS MSPGCL THERMAL-COAL 63000 297275 47000
PARLI TPS MSPGCL THERMAL-COAL 113000 175934 71600
PARAS MSPGCL THERMAL-COAL 50000 267931 38700
URAN CCPP MSPGCL THERMAL-GAS 67200 320330 30600
KOYANA MSPGCL HYDRO-HYDRO 195600 328155 13100
SMALL HYDRO POWER PLANTS MSPGCL HYDRO-HYDRO 45400 93062 30500
BHIRA MSPGCL HYDRO-HYDRO 8000 10046 8400
TILLARI MSPGCL HYDRO-HYDRO 8900 10584 3100
SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 233298 20500
SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 87633 20500
PRIVATE SECTOR
Page 36
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 81282 46750
JNSTPP(JAYPEE NIGRIE) JP POWER VENTURES LTD THERMAL-COAL 132000 726695 29310
MB POWER MB POWER THERMAL-COAL 120000 345632 38310
ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 754922 28671
ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 780761 23495
ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 198000 1263784 32090
ADANI POWER MAHARA ADANI POWER LTD THERMAL-COAL 330000 1666191 34124
AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 170065 36827
SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 252035 45129
ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 458551 36000
ESSAR POWER MP LTD ESSAR POWER MP LTD THERMAL-COAL 60000 243040 28600
VEDANTA LTD (P P -I) VEDANTA LTD THERMAL-GAS 3000 15044 24000
VEDANTA LTD (P P -II) VEDANTA LTD THERMAL-GAS 3000 21293 24000
PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 8234600 24000
165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 5850 64390
145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 68717 40349
SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 132655 28776
SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 144686 38567
MUNDRA UMPPCOASTAL GUJARAT POWER
LTD THERMAL-IMP COAL 400000 2530300
23900
LANCO AMARKANTAK TPP PATHADIH
U-ILANCO AMARKAN POWER LTD THERMAL-COAL 30000 195500
29200
LANCO AMARKANTAK TPP PATHADIH
U-IILANCO AMARKAN POWER LTD THERMAL-COAL 30000 206900
27600
BARADARHA TPS D B POWER LTD THERMAL-COAL 120000 677373 29200
JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 405000 28900
JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 453000 40500
DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 339437 40700
TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 293400 44000
TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 137200 37000
TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 174900 44000
BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 92900 14100
BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23700 34300
KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 27600 48300
CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2530300 23900
BHANDARDRA HEP -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 2475 54900
SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 161400 26500
SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 445000 39000
SOTHERN REGION
CENTRAL SECTOR
NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 325699 54820
NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 305532 39880
NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 998805 38510
NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 113016 54070
NEYVELI TAMILNADU POWER LTD JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 625274 42200
VALLUR TPS NTPC TECL THERMAL-COAL 150000 856438 42350
R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 1493 84300
RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1502919 29400
RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 341291 31800
SIMHADRI I NTPC LTD THERMAL-COAL 100000 688382 36800
SIMHADRI II NTPC LTD THERMAL-COAL 100000 663657 43400
KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 593110 31324
MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 291625 21764
KKNPP-1 amp 2 NPCIL NUCLEAR-NUCLEAR 200000 572609 40948
MINICOY LAKSHADEEP THERMAL-DIESEL 340 770 29600
KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1097 29600
AMINI LAKSHADEEP THERMAL-DIESEL 265 509 29600
ANDROTT LAKSHADEEP THERMAL-DIESEL 219 524 29600
KALPENI LAKSHADEEP THERMAL-DIESEL 175 356 29600
AGATTI LAKSHADEEP THERMAL-DIESEL 195 658 29600
KADMAT LAKSHADEEP THERMAL-DIESEL 190 414 29600
KILTAN LAKSHADEEP THERMAL-DIESEL 150 269 29600
CHETLET LAKSHADEEP THERMAL-DIESEL 100 139 29600
BITRA LAKSHADEEP THERMAL-DIESEL 043 024 29600
BANGARAM LAKSHADEEP THERMAL-DIESEL 018 009 29600
Page 37
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) STATE SECTOR
Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 721811 46500
Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 50000 336142 46500
RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 237358 46500
RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 239926 46500
RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 124500 46500
SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 62109 46500
UPPER SILERU APGENCO HYDRO-HYDRO 24000 33000 46500
LOWER SILERU APGENCO HYDRO-HYDRO 46000 81066 46500
DONKARAI APGENCO HYDRO-HYDRO 2500 6007 46500
PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 1262 46500
CHETTIPETA APGENCO HYDRO-HYDRO 100 214 46500
MUCHKUND APGENCO HYDRO-HYDRO 12000 37571 46500
NAGARJUNASAGAR RCPH APGENCO HYDRO-HYDRO 9000 606 46500
TUNGABHADRA HES amp HAMPI(AP
Share)
APGENCO HYDRO-HYDRO 7200 6100 46500
KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 352232 42600
KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 288131 32500
KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 319272 46500
RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 40073 44300
KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 308317 46000
KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 308963 51300
SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 61004 76600
NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 17960 75300
PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 20873 58300
POCHAMPAD-I TSPGENCO HYDRO-HYDRO 2700 5455 29800
POCHAMPAD-II TSPGENCO HYDRO-HYDRO 900 1932 40700
NIZAMSAGAR TSPGENCO HYDRO-HYDRO 1000 1126 53400
RAICHUR TPS 1 to 7 KPCL THERMAL-COAL 147000 890866 43800
RAICHUR TPS 8 KPCL THERMAL-COAL 25000 159523 48200
BELLARI TPS 1 KPCL THERMAL-COAL 50000 318679 51100
BELLARI TPS 2 KPCL THERMAL-COAL 50000 232347 55600
BELLARI TPS 3 KPCL THERMAL-COAL 70000 47565 34400
BHADRA PH KPCL HYDRO-HYDRO 3920 2369 45900
GERUSUPPA PH KPCL HYDRO-HYDRO 24000 26990 22000
GHAT PRABHA HEP KPCL HYDRO-HYDRO 3200 4777 25300
KADRA HPS KPCL HYDRO-HYDRO 15000 16889 26800
NAGJHARI KPCL HYDRO-HYDRO 90000 155159 9800
KODASALLI DPH KPCL HYDRO-HYDRO 12000 14854 19200
MUNIRA+MGH+SPH+SPH KPCL HYDRO-HYDRO 22640 48211 7900
SHARAVATHY HPS KPCL HYDRO-HYDRO 108550 276215 5400
ALMATTI DPH KPCL HYDRO-HYDRO 29000 39611 24600
VARAHI UGPH KPCL HYDRO-HYDRO 46000 71368 15600
IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 17196 15300
IDUKKI HPS KSEB HYDRO-HYDRO 78000 137905 15300
KAKKAD HPS KSEB HYDRO-HYDRO 5000 13063 15300
KALLADA HPS KSEB HYDRO-HYDRO 1500 4436 15300
KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 46544 15300
KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 635 15300
LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 30822 15300
MALANKARA HPS KSEB HYDRO-HYDRO 1050 2474 15300
MATTUPETTY KSEB HYDRO-HYDRO 200 230 15300
MALAMPUZHA KSEB HYDRO-HYDRO 250 063 15300
CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 864 15300
URUMI ST I amp II KSEB HYDRO-HYDRO 615 903 15300
LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 248 15300
NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7765 19625 15300
PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 16601 15300
PANNIAR HPS KSEB HYDRO-HYDRO 3240 6217 15300
PORINGALKUTHU KSEB HYDRO-HYDRO 3600 10052 15300
PORINGALKUTHU LBE KSEB HYDRO-HYDRO 1600 9438 15300
PEPPARA KSEB HYDRO-HYDRO 300 395 15300
POOZHITHODE KSEB HYDRO-HYDRO 480 1045 15300
Page 38
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) PEECHI KSEB HYDRO-HYDRO 125 040 15300
RANI-PERUNADU KSEB HYDRO-HYDRO 400 585 15300
SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 79783 15300
SENGULAM HPS KSEB HYDRO-HYDRO 5120 11558 15300
SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 16711 15300
VILANGAD KSEB HYDRO-HYDRO 750 1578 15300
BARAPOLE KSEB HYDRO-HYDRO 1500 1932 15300
VELLATHOOVAL KSEB HYDRO-HYDRO 360 305 15300
CHIM0NY KSEB HYDRO-HYDRO 250 156 15300
ADYANPARA KSEB HYDRO-HYDRO 350 501 15300
BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 554 15300
KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 3801 15300
KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 23132 32800
ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 14416 62280
METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 523970 62280
METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 321270 62280
NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 336575 62280
NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 591240 62280
TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 508966 62280
KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 30897 62280
VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 18720 90699 62280
KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 33593 62280
BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 1047 62280
PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 1250 62280
PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 330 62280
MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 4897 62280
MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 032 62280
KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15681 62280
KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 40608 62280
KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 21342 62280
KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 4717 62280
KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4322 62280
KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2399 62280
METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 4416 62280
METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 8035 62280
BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2187 62280
BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2359 62280
BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2511 62280
BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 1949 62280
BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 1819 62280
POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 172 62280
SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 241 62280
MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 026 62280
THIRUMOORTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 136 62280
PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 9309 62280
VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 353 62280
SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 4192 62280
PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 6571 62280
SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 1186 62280
SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6319 62280
ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 6122 62280
KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 28674 62280
SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 18381 62280
SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 4258 62280
KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 12680 62280
KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4201 62280
ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 000 62280
PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 19175 62280
AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 078 62280
BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 504 62280
BHAVANI KATTALAI (BKB)(IIIampIII BB I amp II)TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 5847 62280
PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 000 62280
Page 39
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) SRI DAMODARAM STPS APPDCL THERMAL-COAL 160000 808108 36300
PRIVATE SECTOR
KARUPPUR TANJORE LANCO TANJORE PCL THERMAL-GAS 12000 48096 28770
SIMHAPURI ENERGY LTD SIMHAPURI ENERGY LTD THERMAL-COAL 60000 143900 39100
JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 7111 45500
SBU 1 JSW ENERGY LTD
VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 26000 159100
43300
SBU 2 JSW ENERGY LTD
VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 60000 247900
42800
LANCO KPLLANCO KONDAPALLI POWER
LTDTHERMAL-GAS 36814 85060
25776
LANCO KPL STG -IILANCO KONDAPALLI POWER
LTDTHERMAL-GAS 36600 12979
46330
LANCO KPL STG -IIIALANCO KONDAPALLI POWER
LTDTHERMAL-GAS 37100 85710
46330
LANCO KPL STG -III BLANCO KONDAPALLI POWER
LTDTHERMAL-GAS 37100 43639
46330
HINDUJA NATIONAL PCL HINDUJA NATIONAL PCL THERMAL-COAL 104000 303000 38200
MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 121164 49940
UDUPI POWER COR LTD ADANI POWER LTD THERMAL-COAL 120000 754613 42500
SPECTRUM POWER GENERATION
LTD SPECTRUM PG LTD THERMAL-GASN 20525 9256812
34952
TAQA NEYVELI POWER COM PVT
LTD TAQA NEYVELI THERMAL-LIG 25000 5840
34500
ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 251000 51000
ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 207860 36800
GMR VEMAGIRI POWER GENERATION
LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 30117
46450
EASTERN REGION
CENTRAL SECTOR
MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 64675 53113
MTPS STAGE - II KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 39000 1432 69138
BOKARO `B` TPS DVC THERMAL-COAL 63000 145670 31539
MEJIA TPS U 1-3 DVC THERMAL-COAL 63000 348298 31552
MEJIA TPS U 4 DVC THERMAL-COAL 21000 116099 34997
MEJIA TPS U 5-6 DVC THERMAL-COAL 50000 276427 35976
MEJIA TPS U 7-8 DVC THERMAL-COAL 100000 552854 36991
DURGAPUR STEEL TPS DVC THERMAL-COAL 100000 665550 39323
DURGAPUR TPS DVC THERMAL-COAL 21000 59270 35416
RAGHUNATHPUR TPS DVC THERMAL-COAL 120000 201650 35326
MAITHON HYDEL STA DVC HYDRO-HYDRO 6320 12200 17984
CHANDRAPURA TPSU1-3 DVC THERMAL-COAL 42000 257610 35095
CHANDRAPURA TPSU7-8 DVC THERMAL-COAL 50000 306673 34987
KODERMA TPS DVC THERMAL-COAL 100000 380180 38131
PANCHET HPS DVC HYDRO-HYDRO 8000 13360 17984
TILLAYA HPS DVC HYDRO-HYDRO 400 1410 17984
RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34700 35400
TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 277300 23200
TLDP -III NHPC LTD HYDRO-HYDRO 13200 55400 62000
TLDP -IV NHPC LTD HYDRO-HYDRO 16000 60300 25600
FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 957219 33700
FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 308943 41000
BONGAINGAON TPS NTPC LTD THERMAL-COAL 25000 153663 58600
KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 542277 34200
KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 942591 34200
BARH-II NTPC LTD THERMAL-COAL 132000 728021 44500
TALCHER TPS NTPC LTD THERMAL-COAL 46000 335521 30100
TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 702319 25600
TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1436521 24700
STATE SECTOR
BTPS(RampM) BIHAR STATE PGCL THERMAL-COAL 22000 12142 39700
BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 98331 10602
HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 50593 9482
CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 19689 2605
RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 53192 6033
UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 147208 14637
Page 40
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 60353 4519
IB TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 288567 25000
J P H GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 210 038 61100
MEYONG CHU GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 400 1086 61100
TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 122667 38200
DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 214339 43321
KOLAGHAT THERMAL POWER
STATION
WEST BENGAL PDCL THERMAL-COAL 126000 538269 31603
BAKRESHWAR THERMAL POWER
PLANT
WEST BENGAL PDCL THERMAL-COAL 105000 634876 32154
BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 45000 166855 33299
SANTHALDIH THERMAL POWER
STATION
WEST BENGAL PDCL THERMAL-COAL 50000 336442 34932
SAGARDIGHI THERMAL POWER
PROJECT
WEST BENGAL PDCL THERMAL-COAL 160000 423121 34705
JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 20344 68900
RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 24559 68900
TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 4623 68900
PURULIA PUMPED STORAGE
PROJECT
WEST BENGAL SEDCL HYDRO-HYDRO 90000 108816 68900
MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2768 68900
PRIVATE SECTOR
CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 49474 20230
CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 555500 70200
HALDIA ENERGY HALDIA ENERGY LTD THERMAL-COAL 60000 371000 50400
DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3688 63400
KAMALANGA TPS GMR KAMALANGA ENERGY LTD THERMAL-COAL 105000547670
33300
ADHUNIK POWER U-1 ADHUNIK POWER THERMAL-COAL 27000 158 44060
ADHUNIK POWER U-2 ADHUNIK POWER THERMAL-COAL 27000 168 44250
VL-JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 332800 23622
JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 43000 45250
JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 71700 37030
JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 70700 35920
JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 71100 38870
JOJOBERA UNIT 5 TATA POWER COM LTD THERMAL-COAL 12000 79300 44560
JOJOBERA UNIT 6 TATA POWER COM LTD THERMAL-WHR 12000 83700 12840
IEL KALINGANAGAR U-I TATA POWER COM LTD THERMAL-WG 6750 33400 22500
IEL KALINGANAGAR U-II TATA POWER COM LTD THERMAL-WG 6750 34800 22500
MAITHON UNIT 1 amp 2 TATA POWER COM LTD THERMAL-COAL 105000 678000 36100
HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 27500 24340
HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 28400 24340
HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 15800 24310
NORTH EASTERN REGION
CENTRAL SECTOR
LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 74100 36600
AGARTALA GT NEEPCO THERMAL-GAS 13500 88611 27210
ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 153111 32310
DOYANG HEP NEEPCO HYDRO-HYDRO 7500 25598 49801
KOPILI HEP NEEPCO HYDRO-HYDRO 20000 98186 11491
KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 19582 20237
KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 10310 17968
RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 124093 22945
TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 10100 17344 39000
STATE SECTOR
HYDRO POWER (122 Stns) ITANAGAR GOVT OF ARUNACHAL
PRADESHHYDRO-HYDRO 6971 6217270
24600
KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39514 17337
LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 82327 36810
NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 33318 48290
MYNTRIANG SHEP ST II ASSAM POWER GENCO HYDRO-HYDRO 300 567 35776
LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 9130 49200
LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 012 49200
DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 022 49200
TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 000 49200
UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 4990 16000
UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 6476 37000
UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 16494 14600
UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 3600 9556 15000
SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 758 8000
MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44070 44800
KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 154 41400
TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 091 41400
MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 411 41400
MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 394 41400
KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 760 41400
SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 3264 41400
LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 044 41400
BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 18953 28000
ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 43585 28200
GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 4080 11100
Note
LIG Lignite N Naptha WHR Waste Heat Recovery
Page 41
SN Section A - Highlights of Power Sector Page
1 Electricity Generation for Apr-2019 (BU) 1A amp 1B
2 Generating Capacity Addition for Apr-2019 (MW) 2
3 List of Projects Commissioned in Apr-2019 3
4 All India Installed Capacity (MW) Region-wise as on 30-04-19 3
5 All India Installed Capacity (MW) Sector-wise as on 30-04-19 4
6 Transmission Lines Added during Apr-2019 (Ckms) 5
7 Transformation Capacity Addition during Apr-2019 (MVA) 6
8 Power Supply Position (Energy amp Peak) in Apr-2019 7
9 Peak Shortage of Power Supply (MW) in Different Regions 8-9
10 All India PLF Sector-wise for Apr-2019 10
11 T amp D and AT amp C Losses ()
12 All India Village Electrification
13 Average cost of Power amp Average Realisation
14 All India Coal consumption for Power Generation (MT)
1 Capacity Addition Targets and Achievements in 12th Plan 12
2 Capacity Addition Targets amp Achievements during Apr-2019 13
3 Installed Capacity in various Regions including their shares 14-19
1 Programme and Achievements of Transmission Lines in Apr-2019
2 List of Transmission Lines CommissionedReady for commissioning during Apr-2019
1 Programme and Achievements of Sub-Stations in Apr-2019
2 List of Sub Stations commissionedready for commisssioning in Apr-2019
1 Electricity Generation (MU) Targets and Achievements for 2019-20 22
1 Power Supply Position (Provisional) for Apr-2019 23
2 Peak Demand and Peak Met (Provisional) for Apr-2019 24
3 Power Supply Position (Revised) for Mar-2019 25
4 Peak Demand and Peak Met (Revised) for Mar-2019 26
5 Notified Power cuts Restrictions on Industries during Apr-2019 27
6 Power Supply to Agricultural Sector during Apr-2019 28
1 Growth of Installed Capacity since 6th Plan 29
2 Growth of Transmission Sector since 6th Plan 30
3 All India Yearly Coal consumption for Power Generation (Utilities)
4 All India Annual Per Capita Consumption of Electricity since 2006
5 Average cost of power supply amp Average realisation (Paisakwh)
6 Growth of Rural Electrification amp Pump Sets Energisation
7 Status of Hydro Schemes Cleared by the CEA in Apr-2019
1 Rate of sale of power for the year 2016-17 33-41
Section H - Rate of sale of power for the year 2016-17
Executive Summary for the Month of Apr-2019
32
11
20
21
31
Section B - Capacity Addition
Section C - Transmission Lines
Section D - Sub Stations
Section E - Electricity Generation
Section F - Power supply position
Contents
Section G - Growth of Power Sector
SN Contents Page
1Electricity Generation (Conventional Sources) for Apr-2019 (BU) 1
2 Generating Capacity Addition for Apr-2019 (MW) 2
3 List of Projects Commissioned in Apr-2019 3
4 All India Installed Capacity (MW) Region-wise as on 30-04-19 3
5 All India Installed Capacity (MW) Sector-wise as on 30-04-19 4
6 Transmission Lines Added during Apr-2019 (Ckms) 5
7 Transformation Capacity Addition during Apr-2019 (MVA) 6
8 Power Supply Position (Energy amp Peak) in Apr-2019 7
9 Peak Shortage of Power Supply (MW) in Different Regions 8-9
10 All India PLF Sector-wise for Apr-2019 10
11 T amp D and AT amp C Losses ()
12 All India Village Electrification
13 Average cost of Power amp Average Realisation
14 All India Coal consumption for Power Generation (MT)
Section A - Highlights of Power Sector
11
Achievement
Apr-19
Thermal 9442 152
Nuclear 318 -390
Hydro 1109 4680
Bhutan Import 024 94659
All India 10893 485
Type
Thermal
Nuclear
Hydro
Bhutan Import
All India
1A
9300
9300
1 Electricity Generation for Apr-2019 (BU)
Apr-19
TypeAchievement
Apr-18
Targets Change of
Achievement
wrt Apr-2018
9896
002
3673
11235
756
331
9539
48510891039
10389
018
9442
3177
152
Change wrt Apr-18 to Apr-18
Electricity Generation During Apr-18 to Apr-18 amp Apr-19 to Apr-19 (BU)
Apr-18 to Apr-18 Apr-19 to Apr-19
11092
024002
-390331
4680756
94247
10389
10893
10100
10200
10300
10400
10500
10600
10700
10800
10900
11000
BU
Apr-18 Apr-19
10391089
00
200
400
600
800
1000
1200
BU
Apr-18 to Apr-18 Apr-19 to Apr-19
Generation from
Conventional
Sources
Generation
from
Renewable
Sources
Total Generation from
Conventional Sources
Generation from
Renewable SourcesTotal
Growth in
Conventional
Generation
Growth in
Renewable
Generation
Growth in
Total
Generation
(BU) (BU) (BU) (BU) (BU) (BU) () () ()
108929 9900 118829 103889 8443 112332 485 1726 578
Note Tentative
SlNo
Source-Wise All
India
Generation
from
Renewables Mar-2019 Mar-2018 April 2018 to March 2019 April 2017 to March 2018
1 Wind 2965930 2906760 62036380 52666090
2 Solar 4307980 3311530 39268200 25871070
3 Biomass 255320 270430 2763820 3404950
4 Bagasse 1814860 1794220 13562670 11847350
5 Small Hydro 473060 376850 8702750 7691580
6 Others 30700 33120 425280 358450
Total 9847850 8692910 126759100 101839490
Note 1) Data as received from SLDCElectricity Department of the respective states or from the electricity department
2) 25 MW Khopli-II project of NEEPCO located in Assam is considered under Small Hydro wef 01072018 Earlier it was considered under Hydro
3) Previous month generation has been taken as SLDC has not furnished generation data for the current month
Electricity Generation (Conventional and Renewable Sources)
Apr-2019 Apr-2018 Growth
1B
For the Month of Cummulative for the period
All India Generation From Renewables (All Figures are in MU)
Achievement Targets Achievement
Apr-18
Thermal 69755 1160 0 000
Hydro 0 0 0 NA
Nuclear 0 0 0 NA
All India 69755 1160 0 000
Apr-18 to Apr-18 Apr-19 to Apr-19 Change wrt Previous Year
Thermal 69755 0 00
Hydro 0000 0 NA
Nuclear 0000 0 NA
All India 69755 0 00
2
2 Generating Capacity Addition for Apr-2019 (MW)
Generating Capacity Addition during Apr-18 to Apr-18 amp Apr-19 to Apr-19
NA- Not Applicable
Achivement
wrt Apr-2018Type
Apr-19
698
000
10
20
30
40
50
60
70
80
1Apr-18 Apr-19
0000
10000
20000
30000
40000
50000
60000
70000
80000
Apr-18 to Apr-18 Apr-19 to Apr-19
1
2
3
Nuclear Hydro RES Grand TotalRegion Coal Lignite Gas Diesel Total
Northern 5036020 158000 578126 000 5772146 162000 1970777 1419902 9324825
Western 7280862 154000 1080649 000 8515511 184000 754750 2307894 11762155
Southern 4304202 314000 647366 56158 5321726 332000 1177483 3862018 10693227
Eastern 2746364 000 10000 000 2756364 000 494212 140148 3390724
North-East 77002 000 177581 3600 258183 000 142700 32429 433311
Islands 000 000 000 4005 4005 000 000 1773 5778
ALL INDIA 19444450 626000 2493722 63763 22627934 678000 4539922 7764163 35610019
Note Captive Genaration is not included in the total Captive Power capacity as on 31032017 RES as on 31032019 3
Thermal
Nuclear
3 List of Projects Commissioned During Apr-2019
4 All India Installed Capacity (MW) Region-wise as on 30-04-19
NIL
NIL
Thermal
NIL
Hydro
22627934
678000
4539922
7764163
35610019
51529
000
5000000
10000000
15000000
20000000
25000000
30000000
35000000
40000000
Thermal Nuclear Hydro RES Total Captive
Thermal Nuclear Hydro RES Total Captive
Total = 356100189
Sector
Coal Lignite Gas Diesel Total
State 6407650 129000 711871 36393 7284913 000 2987880 234793 10507586
Private 7468800 183000 1058060 27370 8737230 000 339400 7366140 16442770
Central 5568000 314000 723791 000 6605791 678000 1212642 163230 8659663
All India 19444450 626000 2493722 63763 22627934 678000 4539922 7764163 35610019
State 10507586
Private 16442770
Central 8659663
Electricity Generation (MU) Targets and Achievements for 2016-17
5 All India Installed Capacity (MW) Sector-wise as on 30-04-19
4
Grand TotalTHERMAL
Nuclear Hydro RES
RES as on 31032019
State 10507586 30
Private 16442770 46
Central 8659663 24
All India Installed Capacity(MW) (Sector-Wise)
Voltage Level
+- 500 KV HVDC
+- 800 KV HVDC
765 KV
400 KV
220 KV
All India
Voltage Level
+- 500 KV HVDC
+- 800 KV HVDC
765 KV
400 kV
220 KV
All India
5
481 401
763 474
0 0
242 53
40 20
0 0
242 53
40 20
481 401
763 474
Transmission Lines Added duringApr-18 to Apr-18 ampApr-19 to Apr-19 (Ckms)
Apr-18 to Apr-18 Apr-19 to Apr-19
0 0
6 Transmission Lines Added during Apr-2019 (Ckms)
Apr-18 Apr-19
0 0
763
474
0
100
200
300
400
500
600
700
800
900
All India
Ckm
s
Apr-18 Apr-19
763
474
0
100
200
300
400
500
600
700
800
900
All India
Ckm
s
Apr-18 to Apr-18 Apr-19 to Apr-19
Voltage Level
+- 800 KV HVDC
+- 500 KV HVDC
765 KV
400 KV
220 KV
All India
Voltage Level
+- 800 KV HVDC
+- 500 KV HVDC
765 KV
400 KV
220 KV
All India
6
0 0
All India Transformation Capacity Addition during Apr-18 to Apr-18 amp Apr-19
to Apr-19 (MVA)
4600
0
500
2795
1305
5470
4000
185
1285
0
Apr-18 to Apr-18 Apr-19 to Apr-19
5470
0
500
4600
2795
1305
7 Transformation Capacity Addition During Apr-2019 (MVA)
0
4000
185
1285
0 0
Apr-18 Apr-19
5470
4600
4000
4200
4400
4600
4800
5000
5200
5400
5600
MV
A
Apr-18 Apr-19
5470 4600
0
74520
1
MV
A
Apr-18 to Apr-18 Apr-19 to Apr-19
Apr-2018 Apr-2019 Apr-2018 Apr-2019 Apr-2018 Apr-2019
Northern 28590 30094 28170 29786 -15 -10
Western 33235 34875 33233 34868 00 00
Southern 29211 31111 29166 31109 -02 00
Eastern 11752 12851 11650 12850 -09 00
North Eastern 1225 1300 1174 1228 -42 -55
All India 104013 110231 103393 109842 -06 -04
Apr-2018 Apr-2019 Apr-2018 Apr-2019 Apr-2018 Apr-2019
Northern 48824 54476 48367 53985 -09 -09
Western 50654 56242 50434 56222 -04 00
Southern 45946 49155 45684 49103 -06 -01
Eastern 21320 23349 21275 23349 -02 00
North Eastern 2600 2848 2552 2780 -18 -24
All India 162492 177411 161286 176810 -07 -03
Apr-2019 Figures are Provisional
7
8 Power Supply Position (Energy amp Peak) in Apr-2019
Peak Demand Peak Met
Requirement Availability
Energy (MU)Region
Surplus(+)
Deficit (-) in
Surplus(+)
Deficit (-) in Region
Power (MW)
Chandigarh Delhi Haryana HP JampK Punjab Rajasthan UP Utrakhand Apr-2018 0 0 0 0 546 0 0 247 0
Apr-2019 0 0 0 0 565 0 0 0 0
Chattisgarh Gujarat MP Maharashtra Daman amp Diu Dadar Nagar Goa
Apr-2018 13 11 3 99 0 0 0
Apr-2019 22 6 0 8 1 0 0
AP Telangana Karnataka Kerala Tamil Nadu Puducherry Lakshadweep
Apr-2018 22 0 2 0 0 20 0
Apr-2019 0 0 0 8 0 2 0
8
9 Peak Shortage of Power Supply (MW) in Different Regions in Apr-2019
0 0 0 0
565
0 0 0 00 0 0 0
546
0 0
247
0
0
400
800
Ch
an
dig
ar
h Delh
i
Ha
rya
na
HP
Jamp
K
Pu
nja
b
Ra
jasth
an
UP
Utr
akhan
d
MW
Northern States (MW) Apr-2019 Apr-2018
22
6 0 8 1 0 0
13
11
3
99
0 0 0
0
50
100
150
Ch
attis
gar
h
Guja
rat
MP
Mah
ara
shtr
a
Da
man amp
Diu
Da
dar
Na
gar G
oa
MW
Western States (MW) Apr-2019 Apr-2018
0 0 08
0 2 0
22
0 2 0 0
20
00
50
AP Telangana Karnataka Kerala Tamil Nadu Puducherry Lakshadweep
Southern State (MW) Apr-2019 Apr-2018
Bihar DVC Jharkhand Odisha West Bengal Sikkim AampN Island
Apr-2018 0 39 0 0 7 0 4
Apr-2019 0 0 0 0 0 0 4
Arunachal Assam Manipur Meghalaya Mizoram Nagaland Tripura
Apr-2018 5 30 7 0 9 29 4
Apr-2019 3 45 9 0 3 26 1
9
0 0 0 0 0 0
4
0
39
0 0
7
0
4
01020304050
Bih
ar
DV
C
Jha
rkh
an
d
Od
ish
a
We
st
Be
ng
al
Sik
kim
Aamp
NIs
land
MW
Eastern States (MW) Apr-2019 Apr-2018
3
45
9
0 3
26
1
5 7
0
9
29
4
0
10
20
30
40
50
Aru
na
cha
l
Assa
m
Ma
nip
ur
Me
gh
ala
ya
Miz
ora
m
Na
gala
nd
Trip
ura
MW
North-Eastern States (MW)
Sector Apr-2018 Apr-2019
Central 7634 7459
State 6438 6142
Private Sector IPP 5525 6005
Private Sector UTL 6815 6440
ALL INDIA 6454 6471
Month PLF 2018 PLF 2019
Jan 6215 6054
Feb 6230 6051
March 6452 6340
April 6454 6471
For Coal and Lignite based Power Plants and Provisional based on Actual-Cum-Assesment
10
PLF of Thermal Power Plants
(excluding gas based power plants)
All India PLF of Thermal Plants (Excluding Gas Based Plants) Month-wise
10 All India Thermal PLF Sector-wise (Excluding Gas Based Power Plants) for Apr-2019
5800
6000
6200
6400
6600
Jan Feb March April
Months
All India PLF Month-wise
PLF 2018 PLF 2019
7634
64385525
6815 6454
7459
6142 60056440 6471
000
2000
4000
6000
8000
10000
Central State Private Sector IPP Private Sector UTL ALL INDIA
All India Thermal PLF
Apr-2018 Apr-2019
2012-13 2013-14 2014-15 2015-16 2016-17 2017-18
TampD Losses 2304 2284 2277 2181 2142 2104
ATampC Losses 2548 2262 2572 2398 NA NA
Provisional
Note As per PFC for utilities selling directly to consumers NA- Not Available
Total Number of Villages
597464
Note From the year 2004-05 onwards Definition of Village Electrification-
A village would be declared Electrified if
Without
Subsidy
Gap ACS-
ARR(
Without
Subsidy)
Paiseunit
Gap ACS-
ARR (on
subsidy
booked
basis)
paiseunit
Gap ACS-
ARR (on
subsidyrece
ived basis)
paiseunit
2013-14 400 118 76 77
2014-15 412 108 58 60
Source- PFC Reports on the performance of State Power Utilities
2013-14 4894
2014-15 5304
2015-16 5459
2016-17 5743
2017-18 6080
2018-19 6289
11
11 T amp D and ATampC Losses ()
12 All India Village Electrification
Villiages Electrified (Nos)
10000All villages as per census 2011 has
been electrified on 28042018
Villages electrified
Average cost of supply(ACS)
(paiseunit)
i) Basic Infrastructure such as Distribution Transformer and Distribution lines are provided in the inhabited locality
as well as Dalit Basti hemlet where it exists (For electrification through Non-Conventional Energy Sources a
Distribution Transformer may not be necessary)
14 All India Coal consumption for Power Generation (MT)
520
Average Revenue Realization(paiseunit)
518
Year
ii) Electricity is provided to Public places like Schools Panchayat Office Health Centre Dispensaries Community
Centres etc and
iv) Mandatory Certification from Gram Panchayat regarding the completion of village electrification should be
obtained
13 Average cost of Power amp Average Realisation
iii) The number of households electrified should be at least 10 of the total number of households in the village
SN Contents Page
1 Capacity Addition Targets and Achievements in 12th Plan amp upto March2019 12
2 Capacity Addition Targets amp Achievements during Apr-2019 and Apr-19 to Apr-19 13
3 Installed Capacity in various Regions including their shares 14-19
Section B - Capacity Addition
(i) CAPACITY ADDTION TARGETS AND ACHIEVEMENTS IN THE 12TH PLAN Figures in MW
TARGET ACH TARGET ACH TARGET ACH TARGET ACH
CENTRAL 14878 15869 6004 2584 5300 2000 26182 20453
STATE 13922 22201 1608 2276 0 0 15530 24477
PRIVATE 43540 53661 3285 619 0 0 46825 54280
ALL INDIA 72340 91730 10897 5479 5300 2000 88537 99209
(ii) CAPACITY ADDITION TARGET AND ACHIEVEMENT FOR 2017-18 (IN MW)
THERMAL HYDRO NUCLEAR
TARGET ACH TARGET ACH TARGET ACH TARGET ACH
CENTRAL 4880 3170 800 390 500 6180 3560
STATE 3546 1760 300 200 0 3846 1960
PRIVATE 2940 3780 205 205 0 3145 3985
ALL INDIA 11366 8710 1305 795 500 0 13171 9505
(iii) CAPACITY ADDITION ACHIEVEMENT FOR 2018-19 (IN MW)
TARGET ACH TARGET ACH TARGET ACH TARGET ACH
CENTRAL 2760 1960 710 110 0 0 3470 2070
STATE 4506 2850 130 30 0 0 4636 2880
PRIVATE 0 972 0 0 0 0 0 972
ALL INDIA 7266 5782 840 140 0 0 8106 5922
12
SECTOR
SECTOR
TOTAL
TOTALNUCLEARHYDROTHERMAL
1 Capacity Addtion Targets and Achievements in the 12th Plan amp upto March2019
SECTORTHERMAL HYDRO NUCLEAR TOTAL
(MW)
Cummulative
Deviation
Target Achievement Target Achievement (+) (-)
Central 6040 500 0 500 0 -500
State 425615 660 0 660 0 -660
Private 0 0 0 0 0 0
Total 1029615 1160 0 1160 0 -1160
Central 600 0 0 0 0 0
State 21099 0 0 0 0 0
Private 379 0 0 0 0 0
Total 118999 0 0 0 0 0
Nuclear Central 700 0 0 0 0 0
Central 7340 500 0 500 0 -500
State 446714 660 0 660 0 -660
Private 379 0 0 0 0 0
Total 1218614 1160 0 1160 0 -1160
Electricity Generation (MU) Targets and Achievements for 2016-17
13
Hydro
All India
Capacity Addition TargetsAchievements during the Month of Apr-2019
Thermal
2 Capacity Addition Targets Achievements During Apr-2019
Schemes Sector
Target 2019-20
Apr-19 to Apr-19Apr-19
11
60
0 0
11
60
0 0 0 0
0
200
400
600
800
1000
1200
1400
Thermal Hydro Nuclear Total
MW
Targets and Achievement during 2019-20Target Achievement
0
200
400
600
800
1000
1200
Thermal Hydro Nuclear Total
1160
0 0
1160
0 0 00
MW
Target Achievement
Coal Lignite Gas Diesel Total
State 1634400 25000 287920 000 1947320 000 869755 69956 2887031
Private 2168083 108000 55800 000 2331883 000 251400 1312046 3895329
Central 1233537 25000 234406 000 1492943 162000 849622 37900 2542465
Sub Total 5036020 158000 578126 000 5772146 162000 1970777 1419902 9324825
State 2156000 104000 284982 000 2544982 000 544650 54789 3144421
Private 3474567 50000 467600 000 3992167 000 48100 2186476 6226743
Central 1650295 000 328067 000 1978362 184000 162000 66630 2390992
Sub Total 7280862 154000 1080649 000 8515511 184000 754750 2307894 11762155
State 1993250 000 79198 28788 2101236 000 1177483 58688 3337407
Private 1187450 25000 532210 27370 1772030 000 000 3749140 5521170
Central 1123502 289000 35958 000 1448460 332000 000 54190 1834650
Sub Total 4304202 314000 647366 56158 5321726 332000 1177483 3862018 10693227
State 624000 000 10000 000 634000 000 353792 27511 1015303
Private 638700 000 000 000 638700 000 39900 111637 790237
Central 1483664 000 000 000 1483664 000 100520 1000 1585184
Sub Total 2746364 000 10000 000 2756364 000 494212 140148 3390724
State 000 000 49771 3600 53371 000 42200 23325 118895
Private 000 000 2450 000 2450 000 000 6104 8554
Central 77002 000 125360 000 202362 000 100500 3000 305862
Sub Total 77002 000 177581 3600 258183 000 142700 32429 433311
State 000 000 000 4005 4005 000 000 525 4530
Private 000 000 000 000 000 000 000 738 738
Central 000 000 000 000 000 000 000 510 510
Sub Total 000 000 000 4005 4005 000 000 1773 5778
State 6407650 129000 711871 36393 7284913 000 2987880 234793 10507586
Private 7468800 183000 1058060 27370 8737230 000 339400 7366140 16442770
Central 5568000 314000 723791 000 6605791 678000 1212642 163230 8659663
Total 19444450 626000 2493722 63763 22627934 678000 4539922 7764163 35610019
Figures at decimal may not tally due to rounding off
Note -
(As per latest information available with MNRE)
Break up of RES all India as on 31032019 is given below (in MW)
459315 3562597 2818071 7764163
A 0 MW
B Apr 2019 0 MW
C
Apr 2019 0 MW
D Net Capacity Added during Apr 2019 A-B-C 0 MW
Sector wise breakup of RES capacity as shown is provisional
Share of installed capacity of BBMB Stations is included in state sector of partner states
BM PowerCogen Waste to Energy
910350 13830
Capacity Added during Apr 2019
Capacity Retired during
Capacity removed due to change
from Conventional to RES during
Islands
ALL INDIA
Abbreviation- SHP=Small Hydro Project (le 25 MW) BP=Biomass Power UampI=Urban amp Industrial Waste Power RES=Renewable Energy Sources
1 RES include SHP BP UampI Solar and Wind Energy Installed capacity in respect of RES (MNRE) as on 31032019
Small
Hydro PowerWind Power
Bio-PowerSolar Power
Total
Capacity
RES
(MNRE)
Northern Region
Western Region
Southern Region
Eastern Region
North Eastern
Region
ALL INDIA INSTALLED CAPACITY (IN MW) OF POWER STATIONS
(As on 30042019)
(UTILITIES)
Region Ownership Sector
Mode wise breakup
Grand TotalThermalNuclear Hydro
Coal Lignite Gas Diesel Total
State 13500 000 180040 000 193540 000 000 000 193540
Private 86922 000 10800 000 97722 000 000 17889 115611
Central 311272 000 20701 000 331973 10283 72309 000 414565
Sub-Total 411694 000 211541 000 623235 10283 72309 17889 723716
State 272000 000 15000 000 287000 000 110282 6930 404212
Private 408078 000 000 000 408078 000 20000 34512 462590
Central 129472 000 53561 000 183034 10094 66370181 500 259998
Sub-Total 809550 000 68561 000 878112 10094 196652 41942 1126799
State 000 000 000 000 000 000 69460 25661 95121
Private 000 000 000 000 000 000 99200 62668 161868
Central 18340 000 6201 000 24541 2895 122388 000 149824
Sub-Total 18340 000 6201 000 24541 2895 291048 88329 406813
State 000 000 17500 000 17500 000 123000 12903 153403
Private 000 000 000 000 000 000 000 6483 6483
Central 50639 000 12907 000 63547 6798 109188 000 179533
Sub-Total 50639 000 30407 000 81047 6798 232188 19386 339419
State 176000 000 15000 000 191000 000 259770 12780 463550
Private 511550 000 000 000 511550 000 28800 115462 655812
Central 85458 000 26401 000 111859 19681 92342 000 223882
Sub-Total 773008 000 41401 000 814409 19681 380912 128242 1343244
State 626000 25000 60380 000 711380 000 109618 2385 823383
Private 280200 108000 000 000 388200 000 10400 730181 1128781
Central 95625 25000 22110 000 142735 55674 73901 34400 306710
Sub-Total 1001825 158000 82490 000 1242315 55674 193919 766966 2258874
State 546900 000 000 000 546900 000 72410 2510 621820
Private 871433 000 000 000 871433 000 84200 288760 1244393
Central 379639 000 54949 000 434588 28948 180253 3000 646789
Sub-Total 1797972 000 54949 000 1852921 28948 336863 294270 2513002
State 000 000 000 000 000 000 125215 6787 132002
Private 9900 000 45000 000 54900 000 8800 52620 116320
Central 34324 000 6966 000 41290 3124 47554 000 91968
Sub-Total 44224 000 51966 000 96190 3124 181569 59407 340290
State 000 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 000 3471 3471
Central 3815 000 1503 000 5317 801 10171 000 16289
Sub-Total 3815 000 1503 000 5317 801 10171 3471 19760
124953 000 29105 000 154058 23703 75145 000 252907
State 1634400 25000 287920 000 1947320 000 869755 69956 2887031
Private 2168083 108000 55800 000 2331883 000 251400 1312046 3895329
Central 1233537 25000 234406 000 1492943 162000 849622 37900 2542465
Grand Total 5036020 158000 578126 000 5772146 162000 1970777 1419902 9324825
Delhi
Haryana
Himachal Pradesh
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
NORTHERN REGION
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
(As on 30042019)
State Ownership Sector
Mode wise breakup
Grand TotalThermalNuclear Hydro
RES
(MNRE)
Jammu amp Kashmir
Punjab
Rajasthan
Uttar Pradesh
Uttarakhand
Chandigarh
Central - Unallocated
Total (Northern
Region)
(As on 30042019)
Coal Lignite Gas Diesel Total
State 000 000 000 000 000 000 000 005 005
Private 000 000 4800 000 4800 000 000 392 5192
Central 46959 000 1967 000 48926 2600 000 000 51526
Sub-Total 46959 000 6767 000 53726 2600 000 397 56723
State 000 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 000 1447 1447
Central 14141 000 4334 000 18475 700 000 000 19175
Sub-Total 14141 000 4334 000 18475 700 000 1447 20622
State 371000 104000 217782 000 692782 000 77200 6470 776452
Private 726567 50000 396000 000 1172567 000 000 833180 2005747
Central 324243 000 42400 000 366643 55900 000 24330 446873
Sub-Total 1421810 154000 656182 000 2231992 55900 77200 863980 3229072
State 540000 000 000 000 540000 000 170366 8396 718762
Private 617400 000 10000 000 627400 000 000 418040 1045440
Central 334238 000 25700 000 359938 27300 152000 30000 569238
Sub-Total 1491638 000 35700 000 1527338 27300 322366 456436 2333440
State 228000 000 000 000 228000 000 12000 1105 241105
Private 885000 000 000 000 885000 000 000 52430 937430
Central 211075 000 000 000 211075 4800 10000 000 225875
Sub-Total 1324075 000 000 000 1324075 4800 22000 53535 1404410
State 1017000 000 67200 000 1084200 000 285084 38813 1408097
Private 1245600 000 56800 000 1302400 000 48100 880441 2230941
Central 466780 000 227273 000 694053 69000 000 12300 775353
Sub-Total 2729380 000 351273 000 3080653 69000 333184 931553 4414390
State 000 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 000 546 546
Central 19560 000 6634 000 26194 900 000 000 27094
Sub-Total 19560 000 6634 000 26194 900 000 546 27640
233300 000 19759 000 253059 22800 000 000 275859
State 2156000 104000 284982 000 2544982 000 544650 54789 3144421
Private 3474567 50000 467600 000 3992167 000 48100 2186476 6226743
Central 1650295 000 328067 000 1978362 184000 162000 66630 2390992
Grand Total 7280862 154000 1080649 000 8515511 184000 754750 2307894 11762155
Goa
Daman amp Diu
Gujarat
Madhya Pradesh
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
WESTERN REGION
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
ThermalNuclear Hydro
RES
(MNRE)
State Ownership Sector
Mode wise breakup
Grand Total
Chhattisgarh
Maharashtra
Dadra amp Nagar
Naveli
Central - Unallocated
Total (Western
Region)
(As on 30042019)
Coal Lignite Gas Diesel Total
State 501000 000 23540 000 524540 000 167360 5618 697518
Private 387388 000 381318 3680 772386 000 000 743342 1515728
Central 154683 12773 000 000 167456 12727 000 25000 205183
Sub-Total 1043071 12773 404858 3680 1464382 12727 167360 773960 2418429
State 558250 000 000 000 558250 000 247993 4122 810365
Private 83945 000 83182 000 167127 000 000 393644 560771
Central 180685 14927 000 000 195612 14873 000 1000 211485
Sub-Total 822880 14927 83182 000 920989 14873 247993 398766 1582621
State 502000 000 000 12792 514792 000 358660 19389 892841
Private 195850 000 000 2520 198370 000 000 1363591 1561961
Central 242780 40140 000 000 282920 69800 000 000 352720
Sub-Total 940630 40140 000 15312 996082 69800 358660 1382979 2807521
State 000 000 000 15996 15996 000 185650 17290 218936
Private 61500 000 17400 000 78900 000 000 19021 97921
Central 86142 28180 35958 000 150280 36200 000 5000 191480
Sub-Total 147642 28180 53358 15996 245176 36200 185650 41311 508337
State 432000 000 52408 000 484408 000 217820 12270 714498
Private 458767 25000 50310 21170 555247 000 000 1229228 1784475
Central 302532 136420 000 000 438952 144800 000 23190 606942
Sub-Total 1193299 161420 102718 21170 1478607 144800 217820 1264688 3105915
State 000 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 000 000 000
Central 000 10000 000 000 10000 000 000 000 10000
Sub-Total 000 10000 000 000 10000 000 000 000 10000
State 000 000 3250 000 3250 000 000 000 3250
Private 000 000 000 000 000 000 000 314 314
Central 14080 10760 000 000 24840 8600 000 000 33440
Sub-Total 14080 10760 3250 000 28090 8600 000 314 37004
142600 35800 000 000 178400 45000 000 000 223400
State 1993250 000 79198 28788 2101236 000 1177483 58688 3337407
Private 1187450 25000 532210 27370 1772030 000 000 3749140 5521170
Central 1123502 289000 35958 000 1448460 332000 000 54190 1834650
Grand Total 4304202 314000 647366 56158 5321726 332000 1177483 3862018 10693227
Kerala
Andhra Pradesh
Telangana
Karnataka
Total (Southern
Region)
Tamil Nadu
NLC
Puducherry
Central - Unallocated
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
SOUTHERN REGION
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
State Ownership Sector
Mode wise breakup
Grand TotalThermalNuclear Hydro
RES
(MNRE)
(As on 30042019)
Coal Lignite Gas Diesel Total
State 000 000 000 000 000 000 000 7070 7070
Private 28100 000 000 000 28100 000 000 25545 53645
Central 384933 000 000 000 384933 000 11000 000 395932
Sub-Total 413033 000 000 000 413033 000 11000 32615 456647
State 42000 000 000 000 42000 000 13000 405 55405
Private 73000 000 000 000 73000 000 000 3495 76495
Central 39374 000 000 000 39374 000 6100 000 45474
Sub-Total 154374 000 000 000 154374 000 19100 3900 177374
State 540000 000 10000 000 550000 000 98600 12195 660795
Private 243700 000 000 000 243700 000 000 35250 278950
Central 76077 000 000 000 76077 000 41000 000 117077
Sub-Total 859777 000 10000 000 869777 000 139600 47445 1056822
State 000 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 000 000 000
Central 698504 000 000 000 698504 000 18620 000 717124
Sub-Total 698504 000 000 000 698504 000 18620 000 717124
State 42000 000 000 000 42000 000 206192 2630 250822
Private 293900 000 000 000 293900 000 000 47346 341246
Central 163390 000 000 000 163390 000 8900 1000 173290
Sub-Total 499290 000 000 000 499290 000 215092 50976 765358
State 000 000 000 000 000 000 36000 5211 41211
Private 000 000 000 000 000 000 39900 001 39901
Central 8703 000 000 000 8703 000 6400 000 15103
Sub-Total 8703 000 000 000 8703 000 82300 5212 96215
112683 000 000 000 112683 000 8501 000 121184
State 624000 000 10000 000 634000 000 353792 27511 1015303
Private 638700 000 000 000 638700 000 39900 111637 790237
Central 1483664 000 000 000 1483664 000 100520 1000 1585184
Grand Total 2746364 000 10000 000 2756364 000 494212 140148 3390724
Total (Eastern
Region)
Bihar
Jharkhand
West Bengal
DVC
Odisha
Sikkim
Central - Unallocated
HydroOwnership Sector
Mode wise breakup
Grand TotalThermalNuclear
RES
(MNRE)
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
State
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
EASTERN REGION
(As on 30042019)
Coal Lignite Gas Diesel Total
State 000 000 32821 000 32821 000 10000 501 43322
Private 000 000 2450 000 2450 000 000 2650 5100
Central 40852 000 43556 000 84408 000 35708 2500 122616
Sub-Total 40852 000 78827 000 119679 000 45708 5651 171038
State 000 000 000 000 000 000 000 10711 10711
Private 000 000 000 000 000 000 000 2939 2939
Central 3705 000 4682 000 8387 000 11655 000 20042
Sub-Total 3705 000 4682 000 8387 000 11655 13650 33692
State 000 000 000 000 000 000 32200 3253 35453
Private 000 000 000 000 000 000 000 012 012
Central 4560 000 10969 000 15529 000 7227 000 22756
Sub-Total 4560 000 10969 000 15529 000 39427 3265 58221
State 000 000 16950 000 16950 000 000 1601 18551
Private 000 000 000 000 000 000 000 009 009
Central 5610 000 43695 000 49305 000 6849 500 56654
Sub-Total 5610 000 60645 000 66255 000 6849 2110 75214
State 000 000 000 3600 3600 000 000 545 4145
Private 000 000 000 000 000 000 000 344 344
Central 4710 000 7157 000 11867 000 9534 000 21401
Sub-Total 4710 000 7157 3600 15467 000 9534 889 25890
State 000 000 000 000 000 000 000 3067 3067
Private 000 000 000 000 000 000 000 100 100
Central 3210 000 4893 000 8103 000 5733 000 13836
Sub-Total 3210 000 4893 000 8103 000 5733 3167 17003
State 000 000 000 000 000 000 000 3647 3647
Private 000 000 000 000 000 000 000 050 050
Central 3105 000 4046 000 7151 000 9794 000 16945
Sub-Total 3105 000 4046 000 7151 000 9794 3697 20642
11250 000 6362 000 17612 000 14000 000 31612
State 000 000 49771 3600 53371 000 42200 23325 118895
Private 000 000 2450 000 2450 000 000 6104 8554
Central 77002 000 125360 000 202362 000 100500 3000 305862
Grand Total 77002 000 177581 3600 258183 000 142700 32429 433311
Assam
Arunachal Pradesh
Meghalaya
Tripura
Manipur
Nagaland
Mizoram
Central - Unallocated
Total (North-
Eastern Region)
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
NORTH-EASTERN REGION
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
State Ownership Sector
Mode wise breakup
Grand TotalThermalNuclear Hydro
RES
(MNRE)
(As on 30042019)
Coal Lignite Gas Diesel Total
State 000 000 000 4005 4005 000 000 525 4530
Private 000 000 000 000 000 000 000 663 663
Central 000 000 000 000 000 000 000 510 510
Sub-Total 000 000 000 4005 4005 000 000 1698 5703
State 000 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 000 075 075
Central 000 000 000 000 000 000 000 000 000
Sub-Total 000 000 000 000 000 000 000 075 075
State 000 000 000 4005 4005 000 000 525 4530
Private 000 000 000 000 000 000 000 738 738
Central 000 000 000 000 000 000 000 510 510
Grand Total 000 000 000 4005 4005 000 000 1773 5778
Andaman amp
Nicobar
Lakshadweep
Total (Islands)
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
ISLANDS
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
State Ownership Sector
Mode wise breakup
Grand TotalThermalNuclear Hydro
RES
(MNRE)
SrNo Contents Page
1 Executive summary of Target and Achievement of Transmission Lines during 2019-20
20(1)
2 List of Transmission Lines CommissionedReady for commissioning during Apr-2019 20(2)
Section C - Transmission Lines
1 Executive summary of Target and Achievement of Transmission Lines during 2019-20 As on 30-04-19
(All figures in circuit kms)
Ce
ntr
al S
ecto
r
Sta
te S
ecto
r
JV
Pri
va
te S
ecto
r
To
tal
Ce
ntr
al S
ecto
r
Sta
te S
ecto
r
JV
Pri
va
te S
ecto
r
To
tal
Ce
ntr
al S
ecto
r
Sta
te S
ecto
r
JV
Pri
va
te S
ecto
r
To
tal
Ce
ntr
al S
ecto
r
Sta
te S
ecto
r
JV
Pri
va
te S
ecto
r
To
tal
Ce
ntr
al S
ecto
r
Sta
te S
ecto
r
JV
Pri
va
te S
ecto
r
To
tal
Ce
ntr
al
Se
cto
r
Sta
te S
ec
tor
JV
Pri
va
te S
ec
tor
Gra
nd
To
tal
0 0 0 0 0 0 0 0 2727 958 2334 6019 2239 3416 1143 6798 781 10023 0 10804 5747 14397 3477 23621
Apr19 Programme 0 0 0 0 0 0 0 0 577 416 557 1550 60 890 203 1153 0 309 0 309 637 1615 760 3012
Achievement 0 0 0 0 0 0 0 0 53 0 0 53 0 20 0 20 0 401 0 401 53 421 0 474
Upto Apr-19 Programme 0 0 0 0 0 0 0 0 577 416 557 1550 60 890 203 1153 0 309 0 309 637 1615 760 3012
Achievement 0 0 0 0 0 0 0 0 53 0 0 53 0 20 0 20 0 401 0 401 53 421 0 474
20(1)
220 kV Grand Total 800 kV 500 kV
Programme 2019-20
Programme
Achievement
HVDC765 kV 400 kV
Line
1 2 3 4 5 6
1 400 Bhadla (PG) - Bhadla (RVPN) line DC PGCIL 53
53
2 400 LILO of one ckt Jhanor - Navsari at Vav Ss DC GETCO 20
3 220 Banda-Chitrakoot Line DC UPPTCL 226
4 220 Gorakhpur (PG)-Gola line DC UPPTCL 82
5 220 Hapur(765) - Faridnagar line SC UPPTCL 11
6 220 Kalikiri - Madanapalli line DC APTRANSCO 60
7 220LILO of Gr Noida -Noida Sec-129 at Noida
Sec-148DC UPPTCL 1
8 220LILO of one Ckt of Badshahpur Pali at Sec-
65 GurgaonDC HVPNL 3
9 220 Sultanpur-Sangipur LILO Section at Amethi DC UPPTCL 18
421
0
474
20(2)
Grand Total
2Transmission Lines (220 kV and above) CommissionedReady for commissioning During Apr-2019
Voltage
Level (kV)Name of Transmission Lines
Circuit
Type
Executing
Agency
CENTRAL SECTOR
Total of CENTRAL SECTOR
STATE SECTOR Sector
Total of STATE SECTOR
PRIVATE SECTOR
Total of PRIVATE SECTOR
SlNo
Length(CKm)
As on 30-04-19
SN Contents Page
1 Executive summary of Target and Achievement of Substations during 2019-20 21(1)
2Sub Stations (220 kV and above) commissionedready for commisssioning during Apr-
201921(2)
Section D - Sub Stations
1 Executive summary of Target and Achievement of Substations during 2019-2020 As on 30-04-19
(All figures in circuit MVA)
Ce
ntr
al S
ecto
r
Sta
te S
ecto
r
JV
Pri
va
te S
ecto
r
To
tal
Ce
ntr
al S
ecto
r
Sta
te S
ecto
r
JV
Pri
va
te S
ecto
r
To
tal
Ce
ntr
al S
ecto
r
Sta
te S
ecto
r
JV
Pri
va
te S
ecto
r
To
tal
Ce
ntr
al S
ecto
r
Sta
te S
ecto
r
JV
Pri
va
te S
ecto
r
To
tal
Ce
ntr
al S
ecto
r
Sta
te S
ecto
r
JV
Pri
va
te S
ecto
r
To
tal
Ce
ntr
al S
ec
tor
Sta
te S
ec
tor
JV
Pri
va
te S
ec
tor
Gra
nd
To
tal
3000 0 0 3000 0 0 0 0 18000 3000 6000 27000 5205 19665 4260 29130 800 21786 0 22586 27005 44451 10260 81716
Apr19 Programme 0 0 0 0 0 0 0 0 3000 0 3000 6000 0 1000 2000 3000 0 800 0 800 3000 1800 5000 9800
Achievement 0 0 0 0 0 0 0 0 500 0 0 500 815 1980 0 2795 0 1305 0 1305 1315 3285 0 4600
Upto Apr-19 Programme 0 0 0 0 0 0 0 0 3000 0 3000 6000 0 1000 2000 3000 0 800 0 800 3000 1800 5000 9800
Achievement 0 0 0 0 0 0 0 0 500 0 0 500 815 1980 0 2795 0 1305 0 1305 1315 3285 0 4600
21(1)
220 kV Grand Total 800 kV 500 kV
Programme 2019-20
Programme
Achievement
HVDC765 kV 400 kV
As on 30-04-19
Sl Voltage Ratio Capacity
No (kVkV) (MWMVA)
1 2 3 4 5
1 Bhadla SS (3x1500 3x500 MVA) 765400 PGCIL 500
2 Extn at Tumkur (Pavagada ) PS (2x500 MVA) 400220 PGCIL 500
3 Bongaigaon (2nd ICT) Ss 400220 PGCIL 315
Total of CENTRAL SECTOR 1315
4 Motiram Adda Gorakhpur (Aug) (Additional TF) 400220 UPPTCL 240
5 Muradnagar-II Ghaziabad (Aug) (Additional TF) 400220 UPPTCL 240
6 Noida Sec- 148 GBNagar (New) 400220 UPPTCL 5007 Sarnath Varanasi (Aug) TF- II (500-315) 400220 UPPTCL 1858 Sarojininagar Lucknow Aug) TF- II (500-315) 400220 UPPTCL 185
9 Unnao (Aug) TF-III 400220 UPPTCL 31510 Nawada SS 400220 HVPNL 31511 Kharepatan SS 22033 MSETCL 2512 Prathipadu SS 220132 APTRANSCO 10013 Pali Ss 22066 HVPNL 160
14 A-5 Faridabad Ss 22066 HVPNL 60
15 Rentachintala Ss Aug(3X100-2x100) 220132 APTRANSCO 10016 Amethi Ss 220132 UPPTCL 160
17 Gajokhar Varanasi (Aug) TF- II (160-100) 220132 UPPTCL 60
18 Gola Gorakhpur (New) 220132 UPPTCL 160
19 Khurja Bulandshahr (Aug) TF- II (200-160) 220132 UPPTCL 40
20 RC Green GB Nagar (Aug) TF-II (160-100) 220132 UPPTCL 60
21 Sikandrabad Bulandshahr (Aug) (Additional TF) 220132 UPPTCL 160
22 Sitapur (Aug) (Additional TF) 220132 UPPTCL 160
23 Sohawal Ayodhya (Aug) TF-II (160-100) 220132 UPPTCL 60
TOTAL STATE SECTOR 3285
GRAND TOTAL 4600
21(2)
CENTRAL SECTOR
STATE SECTOR
2Sub-Stations (220 kV and above) CommissionedReady for commissioning During Apr-2019
Name of Sub Stations Executing Agency
SN Contents Page
1 Electricity Generation (MU) Targets and Achievements for 2019-20 22
Section E - Electricity Generation
Programme Achievement Ach Programme Achievement Ach
Central Sector 37545100 3177900 3129530 9848 3177900 3129530 9848
State Sector 37498600 3322500 2950558 8881 3322500 2950558 8881
PvtIPP Sector 37346200 3236400 3195940 9875 3236400 3195940 9875
PvtUTL Sector 1823100 159300 165579 10394 159300 165579 10394
Total 114213000 9896100 9441607 9541 9896100 9441607 9541
Central Sector 5661700 386100 481390 12468 386100 481390 12468
State Sector 6680500 498200 536514 10769 498200 536514 10769
PvtIPP Sector 1206900 57300 80405 14032 57300 80405 14032
PvtUTL Sector 144100 12300 10930 8886 12300 10930 8886
Total 13693200 953900 1109239 11628 953900 1109239 11628
Central Sector 4472000 367300 317765 8651 367300 317765 8651
Total 4472000 367300 317765 8651 367300 317765 8651
Bhutan Import 621800 17500 24396 13941 17500 24396 13941
Central Sector 47678800 3931300 3928685 9993 3931300 3928685 9993
State Sector 44179100 3820700 3487072 9127 3820700 3487072 9127
Pvt Sector 40520300 3465300 3452854 9964 3465300 3452854 9964
Total 133000000 11234800 10893007 9696 11234800 10893007 9696
Provisional based on actual-cum-Assesment
Figs in MU
Cummulative
Achievement
Cummulative
Achievement
Mar-19 Mar-18 Upto Mar-2019 Upto Mar-2018
984785 869291 12675910 10183949
22
1 Electricity Generation (MU) Targets and Achievememts for 2019-20
All India Energy Generation During Apr-19 to Apr-19 (MU)
Target (2019-20)Apr-19 to Apr-19
Sector
Hydro
Thermal
Nuclear
Renewable Energy Generation
Achievement
Apr-2019
98961
95393673
112348
94416
11092
3178
108930
0
20000
40000
60000
80000
100000
120000
Thermal Hydro Nuclear Total
Programme
Achievement
SN Contents Page
1 Energy Power Supply Position (Provisional) for Apr-2019 and during Apr-19 to Apr-19 23
2 Peak Power Supply Position (Provisional) for Apr-2019 and during Apr-19 to Apr-19 24
3 Energy Power Supply Position (Revised) for Mar-2019 and during Apr-19 to Mar-19 25
4 Peak Power Supply Position (Revised) for Mar-2019 and during Apr-19 to Mar-19 26
5 Notified Power cuts Restrictions on Industries during Apr-2019 27
6 Power Supply to Agricultural Sector during Apr-2019 28
Section F - Power supply position
आकड़ मममलयन यननट नट Figures in MU net
ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied
कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )
चडीगढ़ Chandigarh 117 117 0 00 117 117 0 00
दिलली Delhi 2698 2698 1 00 2698 2698 1 00
हरियजणज Haryana 3773 3773 0 00 3773 3773 0 00
दहमजचल परिश Himachal Pradesh 777 777 0 00 777 777 0 00
रमम कशमीि Jammu amp Kashmir 1604 1296 308 192 1604 1296 308 192
परजब Punjab 3646 3646 0 00 3646 3646 0 00
िजरसथजन Rajasthan 6210 6208 2 00 6210 6208 2 00
उतति परिश Uttar Pradesh 10179 10148 32 03 10179 10148 32 03
उततिजखड Uttarakhand 1120 1120 0 00 1120 1120 0 00
उततरी कषतर Northern Region 30094 29786 308 10 30094 29786 308 10
छततीसगढ़ Chhattisgarh 2684 2676 8 03 2684 2676 8 03
गरिजत Gujarat 10718 10718 0 00 10718 10718 0 00
मधय परिश Madhya Pradesh 6006 6006 0 00 6006 6006 0 00
महजिजषटर Maharashtra 14308 14308 0 00 14308 14308 0 00
िमन औि दिउ Daman amp Diu 220 220 0 00 220 220 0 00
िजिि व नगि हवली Dadra amp Nagar Haveli 552 552 0 00 552 552 0 00
गोवज Goa 388 388 0 00 388 388 0 00
पशचिमी कषतर Western Region 34875 34868 8 00 34875 34868 8 00
आनधर परिश Andhra Pradesh 5708 5708 0 00 5708 5708 0 00
तलगजनज Telangana 5725 5725 0 00 5725 5725 0 00
कनजाटक Karnataka 7003 7003 0 00 7003 7003 0 00
किल Kerala 2402 2400 2 01 2402 2400 2 01
तममल नजड Tamil Nadu 10010 10010 0 00 10010 10010 0 00
पडचिी Puducherry 263 263 0 00 263 263 0 00
लकष-दवीप Lakshadweep 4 4 0 0 4 4 0 0
दकषकषणी कषतर Southern Region 31111 31109 2 00 31111 31109 2 00
बबहजि Bihar 2589 2589 0 00 2589 2589 0 00
िजमोिि घजटी ननगम DVC 1772 1772 0 00 1772 1772 0 00
झजिखणड Jharkhand 689 689 0 00 689 689 0 00
ओडडशज Odisha 2689 2689 1 00 2689 2689 1 00
पशशचम बगजल West Bengal 5075 5075 0 00 5075 5075 0 00
मसशककम Sikkim 37 37 0 00 37 37 0 00
अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 7 29 27 2 7
परवी कषतर Eastern Region 12851 12850 1 00 12851 12850 1 00
अरणजचल परिश Arunachal Pradesh 66 66 0 05 66 66 0 05
असम Assam 766 709 57 75 766 709 57 75
मणणपि Manipur 68 67 1 15 68 67 1 15
मघजलय Meghalaya 170 160 10 59 170 160 10 59
ममज़ोिम Mizoram 54 53 0 08 54 53 0 08
नजगजलड Nagaland 54 54 0 08 54 54 0 08
बिपिज Tripura 122 120 1 12 122 120 1 12
उततर-परवी कषतर North-Eastern Region 1300 1228 71 55 1300 1228 71 55
समपणण भारत All India 110231 109842 389 04 110231 109842 389 04
23
ऊरजा पनत ा म कमी ऊरजा पनत ा म कमीEnergy not Supplied
Excludes energy exported to Bangladesh
Energy not Supplied
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
ऊराण वरवदयत आपरत ण शथिरत ररपोरण (परवाणरवलोकन) Energy Power Supply Position Report (Provisional)
राजयState
अपरल 2019 April2019 अपरल2019 -अपरल2019 April2019 to April2019
अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met
कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )
चडीगढ़ Chandigarh 256 256 0 00 256 256 0 00
दिलली Delhi 5664 5664 0 00 5664 5664 0 00
हरियजणज Haryana 8127 8127 0 00 8127 8127 0 00
दहमजचल परिश Himachal Pradesh 1387 1387 0 00 1387 1387 0 00
रमम कशमीि Jammu amp Kashmir 2826 2261 565 200 2826 2261 565 200
परजब Punjab 7015 7015 0 00 7015 7015 0 00
िजरसथजन Rajasthan 10560 10560 0 00 10560 10560 0 00
उतति परिश Uttar Pradesh 19935 19935 0 00 19935 19935 0 00
उततिजखड Uttarakhand 1922 1922 0 00 1922 1922 0 00
उततरी कषतर Northern Region 54476 53985 491 09 54476 53985 491 09
छततीसगढ़ Chhattisgarh 4596 4574 22 05 4596 4574 22 05
गरिजत Gujarat 17871 17865 6 00 17871 17865 6 00
मधय परिश Madhya Pradesh 10018 10018 0 00 10018 10018 0 00
महजिजषटर Maharashtra 23158 23150 8 00 23158 23150 8 00
िमन औि दिउ Daman amp Diu 341 340 1 02 341 340 1 02
िजिि व नगि हवली Dadra amp Nagar Haveli 818 818 0 00 818 818 0 00
गोवज Goa 594 594 0 00 594 594 0 00
पशचिमी कषतर Western Region 56242 56222 20 00 56242 56222 20 00
आनधर परिश Andhra Pradesh 9151 9151 0 00 9151 9151 0 00
तलगजनज Telangana 10191 10191 0 00 10191 10191 0 00
कनजाटक Karnataka 12681 12681 0 00 12681 12681 0 00
किल Kerala 4309 4300 8 02 4309 4300 8 02
तममल नजड Tamil Nadu 15972 15972 0 00 15972 15972 0 00
पडचिी Puducherry 482 480 2 05 482 480 2 05
लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0
दकषकषणी कषतर Southern Region 49155 49103 52 01 49155 49103 52 01
बबहजि Bihar 5357 5357 0 00 5357 5357 0 00
िजमोिि घजटी ननगम DVC 3039 3039 0 00 3039 3039 0 00
झजिखणड Jharkhand 1266 1266 0 00 1266 1266 0 00
ओडडशज Odisha 5389 5389 0 00 5389 5389 0 00
पशशचम बगजल West Bengal 8666 8666 0 00 8666 8666 0 00
मसशककम Sikkim 100 100 0 00 100 100 0 00
अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7
परवी कषतर Eastern Region 23349 23349 0 00 23349 23349 0 00
अरणजचल परिश Arunachal Pradesh 139 136 3 22 139 136 3 22
असम Assam 1712 1667 45 26 1712 1667 45 26
मणणपि Manipur 197 188 9 46 197 188 9 46
मघजलय Meghalaya 336 336 0 00 336 336 0 00
ममज़ोिम Mizoram 116 113 3 26 116 113 3 26
नजगजलड Nagaland 157 131 26 166 157 131 26 166
बिपिज Tripura 292 291 1 03 292 291 1 03
उततर-परवी कषतर North-Eastern Region 2848 2780 68 24 2848 2780 68 24
समपणण भारत All India 177411 176810 601 03 177411 176810 601 03
24
मजग की पनत ा म कमी Demand not Met
Excludes the supply to Bangladesh
राजयStateअपरल 2019 April2019
मजग की पनत ा म कमी Demand not Met
अधिकतम वरवदयत आपरत ण शथिरत ररपोरण (परवाणरवलोकन) Peak Power Supply Position Report (Provisional)
आकड़ मगज वजट नट Figures in MW netअपरल2019 -अपरल2019 April2019 to April2019
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
आकड़ मममलयन यननट नट Figures in MU net
ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied
कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )
चडीगढ़ Chandigarh 96 96 0 00 1561 1561 0 00
दिलली Delhi 1931 1930 1 00 32299 32282 17 01
हरियजणज Haryana 3658 3658 0 00 53665 53665 0 00
दहमजचल परिश Himachal Pradesh 832 830 2 02 9850 9618 232 24
रमम कशमीि Jammu amp Kashmir 1767 1414 353 200 19593 15868 3725 190
परजब Punjab 3585 3585 0 00 55288 55275 13 00
िजरसथजन Rajasthan 6774 6770 4 01 79826 79637 189 02
उतति परिश Uttar Pradesh 8754 8691 63 07 117101 116118 984 08
उततिजखड Uttarakhand 1067 1067 0 00 13845 13753 92 07
उततरी कषतर Northern Region 28464 28041 423 15 383028 377776 5251 14
छततीसगढ़ Chhattisgarh 2464 2457 8 03 26130 26076 54 02
गरिजत Gujarat 9890 9890 0 00 116588 116572 15 00
मधय परिश Madhya Pradesh 6236 6236 0 00 75667 75665 2 00
महजिजषटर Maharashtra 13631 13631 0 00 158285 158148 137 01
िमन औि दिउ Daman amp Diu 221 221 0 00 2557 2557 0 00
िजिि व नगि हवली Dadra amp Nagar Haveli 553 553 0 00 6317 6317 0 00
गोवज Goa 362 362 0 00 4283 4280 3 01
पशचिमी कषतर Western Region 33357 33349 8 00 389827 389615 212 01
आनधर परिश Andhra Pradesh 6072 6071 1 00 63735 63677 58 01
तलगजनज Telangana 6930 6929 1 00 66697 66635 62 01
कनजाटक Karnataka 7614 7612 1 00 71759 71690 69 01
किल Kerala 2489 2488 1 00 25029 24911 118 05
तममल नजड Tamil Nadu 10247 10245 2 00 109375 109273 102 01
पडचिी Puducherry 252 251 1 04 2761 2751 10 03
लकष-दवीप Lakshadweep 4 4 0 0 46 46 0 0
दकषकषणी कषतर Southern Region 33605 33597 8 00 339355 338938 417 01
बबहजि Bihar 2319 2318 1 00 30052 29827 225 07
िजमोिि घजटी ननगम DVC 1773 1772 1 00 22365 21995 369 17
झजिखणड Jharkhand 698 697 1 01 8682 8461 221 25
ओडडशज Odisha 2583 2582 1 00 31810 31781 30 01
पशशचम बगजल West Bengal 4585 4584 2 00 52237 52078 159 03
मसशककम Sikkim 41 41 0 00 513 512 0 01
अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 67 346 323 23 67
परवी कषतर Eastern Region 11999 11995 5 00 145658 144654 1004 07
अरणजचल परिश Arunachal Pradesh 61 60 0 06 864 855 9 10
असम Assam 680 656 23 34 9532 9204 328 34
मणणपि Manipur 68 68 1 09 916 906 10 11
मघजलय Meghalaya 173 173 0 03 1955 1953 1 01
ममज़ोिम Mizoram 50 49 0 09 668 661 8 12
नजगजलड Nagaland 58 57 1 20 902 809 93 103
बिपिज Tripura 150 150 0 00 1859 1837 21 11
उततर-परवी कषतर North-Eastern Region 1240 1214 26 21 16696 16225 471 28
समपणण भारत All India 108665 108196 469 04 1274564 1267209 7355 06
Note The revised data for March 2019 is not avaliable
Excludes energy exported to Bangladesh
राजयState
ऊराण वरवदयत आपरत ण शथिरत ररपोरण (परवाणरवलोकन) Energy Power Supply Position Report (Provisional)
25
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
Energy not Supplied Energy not Supplied
मािण2019 March2019 अपरल2018 -मािण2019 April2018 to March2019
ऊरजा पनत ा म कमी ऊरजा पनत ा म कमी
अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met
कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )
चडीगढ़ Chandigarh 223 223 0 00 369 369 0 00
दिलली Delhi 4016 4016 0 00 7016 7016 0 00
हरियजणज Haryana 6544 6544 0 00 10270 10270 0 00
दहमजचल परिश Himachal Pradesh 1683 1683 0 00 1700 1700 0 00
रमम कशमीि Jammu amp Kashmir 3277 2622 655 200 3277 2622 655 200
परजब Punjab 6564 6564 0 00 12638 12638 0 00
िजरसथजन Rajasthan 11885 11885 0 00 13276 13276 0 00
उतति परिश Uttar Pradesh 16220 16220 0 00 20498 20062 436 21
उततिजखड Uttarakhand 2002 2002 0 00 2216 2216 0 00
उततरी कषतर Northern Region 47925 47356 569 12 63166 61726 1440 23
छततीसगढ़ Chhattisgarh 4444 4128 316 71 4444 4270 174 39
गरिजत Gujarat 16263 16263 0 00 17053 16963 90 05
मधय परिश Madhya Pradesh 12328 12323 5 00 13815 13815 0 00
महजिजषटर Maharashtra 22361 22291 70 03 23864 23254 610 26
िमन औि दिउ Daman amp Diu 336 336 0 01 357 356 1 02
िजिि व नगि हवली Dadra amp Nagar Haveli 800 799 1 01 816 815 1 01
गोवज Goa 538 538 0 00 596 596 0 00
पशचिमी कषतर Western Region 53132 52965 167 03 56675 55821 853 15
आनधर परिश Andhra Pradesh 8977 8977 0 00 9459 9453 6 01
तलगजनज Telangana 10471 10471 0 00 10815 10815 0 00
कनजाटक Karnataka 12841 12841 0 00 12841 12841 0 00
किल Kerala 4264 4228 36 09 4264 4228 36 09
तममल नजड Tamil Nadu 15712 15712 0 00 15712 15712 0 00
पडचिी Puducherry 427 412 15 34 427 412 15 34
लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0
दकषकषणी कषतर Southern Region 49464 49464 0 00 49464 49464 0 00
बबहजि Bihar 4633 4633 0 00 5115 5084 31 06
िजमोिि घजटी ननगम DVC 3035 3035 0 00 3035 3035 0 00
झजिखणड Jharkhand 1210 1210 0 00 1339 1291 48 36
ओडडशज Odisha 4827 4827 0 00 5357 5357 0 00
पशशचम बगजल West Bengal 8287 8287 0 00 9130 9123 7 01
मसशककम Sikkim 100 100 0 00 106 106 0 00
अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7
परवी कषतर Eastern Region 21658 21658 0 00 23141 22733 408 18
अरणजचल परिश Arunachal Pradesh 133 131 2 15 138 138 0 01
असम Assam 1539 1508 31 20 1865 1809 56 30
मणणपि Manipur 204 199 5 25 219 216 3 12
मघजलय Meghalaya 357 357 0 00 374 372 1 04
ममज़ोिम Mizoram 108 105 3 28 121 119 2 17
नजगजलड Nagaland 127 125 2 16 156 138 18 116
बिपिज Tripura 249 249 0 00 298 293 5 17
उततर-परवी कषतर North-Eastern Region 2540 2535 5 02 2967 2850 117 39
समपणण भारत All India 169464 168745 719 04 177022 175528 1494 08
Note The revised data for March 2019 is not avaliable 26
अधिकतम वरवदयत आपरत ण शथिरत ररपोरण (परवाणरवलोकन) Peak Power Supply Position Report (Provisional)
आकड़ मगज वजट नट Figures in MW net
राजयStateमािण2019 March2019 अपरल2018 -मािण2019 April2018 to March2019
मजग की पनत ा म कमी मजग की पनत ा म कमी Demand not MetDemand not Met
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
Excludes the supply to Bangladesh
अपरल 2019 April2019 अपरल2018 -मािण2019 April2019 to April2019
उततरी कषतर Northern Region
चडीगढ़ Chandigarh(Data Not Received)दिलली Delhi
हरियजणज Haryana
दहमजचल परिश Himachal Pradeshरमम कशमीि Jammu amp Kashmir(Data
Not Received)परजब Punjab
िजरसथजन Rajasthanउतति परिश Uttar Pradesh
उततिजखड Uttarakhand
पशचिमी कषतर Western Region
छततीसगढ़ Chhattisgarh
Apr-Nov 2018- No cuts
Maximum Demand cut-58MW
Energy cut- 00020-00032 MUsday
गरिजत Gujarat
मधय परिश Madhya Pradesh
महजिजषटर Maharashtra
गोवज Goa
दकषकषणी कषतर Southern Region
आनधर परिश Andhra Pradesh
तलगजनज Telangana
कनजाटक Karnataka
किल Kerala
तममल नजड Tamil Nadu
पडचिी Puducherryपरवी कषतर Eastern Region
बबहजि Bihar
झजिखणड Jharkhand
ओडडशज Odisha
पशशचम बगजल West Bengal
No N
otifie
d Cu
ts
27
मािण 2019 म इडथरीर पर वरवदयत करौती का वरवरवरण Notified Power CutsRestrictions on Industries during April2019
राजय कषतर State Regionऊराणमाग करौती EnergyDemand Cut
No N
otifie
d Cu
tsNo
Notifie
d Cu
ts
अपरल2019 April 2019 अपरल2019 -अपरल2019 April2019 to April2019
उततरी कषतर Northern Region
चडीगढ़ Chandigarh Data not received Data not received
दिलली Delhi Data not received Data not received
हरियजणज Haryana 0811 hrsday 0811 hrsday
दहमजचल परिश Himachal Pradesh HPSEBL has only 2 agriculture consumers and uninterrupted
power is being supplied to agriculture sector
HPSEBL has only 2 agriculture consumers and uninterrupted
power is being supplied to agriculture sector
रमम कशमीि Jammu amp Kashmir Data not received Data not received
परजब Punjab 379 hrsday 379 hrsday
िजरसथजन Rajasthan 0630 hrsday 0630 hrsday
उतति परिश Uttar Pradesh 2157 hrsday 2157 hrsday
उततिजखड Uttarakhand 2359 hrsday 2359 hrsday
पशचिमी कषतर Western Region
छततीसगढ़ Chhattisgarh 18 hrsday 18 hrsday
गरिजत Gujarat 8 hrsday 8 hrsday
मधय परिश Madhya Pradesh Three-Phase Supply(Irrigation)- 0953 hrs day Three-Phase
(Mixed) Supply - 2334 hrs day
Three-Phase Supply(Irrigation)- 0953 hrs day Three-Phase
(Mixed) Supply - 2334 hrs day
महजिजषटर Maharashtra Three-Phase Supply(Irrigation)- 9 hrs day Three-Phase Supply(Irrigation)- 9 hrs day
गोवज Goa No restriction No restriction
दकषकषणी कषतर Southern Region
आनधर परिश Andhra Pradesh 07 hrsday 07 hrsday
तलगजनज Telangana 24 hrsday 24 hrsday
कनजाटक Karnataka 6 hrsday 6 hrsday
किल Kerala No Restrictions No Restrictions
तममल नजड Tamil Nadu 9 hrsday (6 hrs during day time and 3 hrs during night time) 9 hrsday (6 hrs during day time and 3 hrs during night time)
पडचिी Puducherry No Restrictions No Restrictions
परवी कषतर Eastern Region
बबहजि Bihar 18 hrsday 18 hrsday
झजिखणड Jharkhand 20 hrsday 20 hrsday
ओडडशज Odisha 24 hrsday 24 hrsday
पशशचम बगजल West Bengal 23 hrsday 23 hrsday
28
मारच 2019 कषि कषतर को षिदयत आपरतच का षििरण Power Supply to Agricultural Sector during March2019
राजय कषतर State Regionऔसत वरवदयत आपरत ण घनरो म Average Hours of Supply
On segregated feeders
SNo Contents Page
1 Growth of Installed Capacity since 6th Plan 29
2 Progress of Transmission Sector since 6th Plan 30
3 All India Yearly Coal consumption for Power Generation (Utilities)
4 All India Annual Per Capita Consumption of Electricity since -2006
5 Average cost of power supply amp Average realisation (Paisakwh)
6 Growth of Rural Electrification amp Pump Sets Energisation
7 Status of Hydro Schemes Cleared by the CEA in Apr-2019
Section G - Growth of Power Sector
31
32
(In MW)
Coal Gas Diesel Total
End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472
End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634
End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537
End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596
End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921
End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703
End of 12th Plan 19216288 2532938 83763 21832988 6780 4447842 50018 31960630
Up to Apr-2019 20070450 2493722 63763 22627934 678000 4539922 7764163 35610019
Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-17) = 51529 MW
Electricity Generation (MU) Targets and Achievements for 2016-17
Coal Gas Diesel Nuclear Hydro Res Total
2007045 2493722 637629 678000 453992 77641625 22925174
29
1 Growth of Installed Capacity Since 6th Plan
Plan YearThermal
Nuclear Hydro RES (MNRE) Total
2007045
2493722637629
678000
4539922
77641625
Total Installed Capacity 35610019 MW
Coal Gas Diesel Nuclear Hydro Res
Progress of Transmission Sector in the Country up to April 2019
1 TRANSMISSION LINES (All fig in CKM)
At the end of
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
6th plan 0 0 0 0 0 0 0 0 0 0 0 0 1831 4198 0 6029 1641 44364 0 46005 3472 48562 0 52034
7th plan 0 0 0 0 0 0 0 0 0 0 0 0 13068 6756 0 19824 4560 55071 0 59631 17628 61827 0 79455
8th plan 0 0 0 0 1634 0 0 1634 0 0 0 0 23001 13141 0 36142 6564 73036 0 79600 31199 86177 0 117376
9th plan 0 0 0 0 3234 1504 0 4738 751 409 0 1160 29345 20033 0 49378 8687 88306 0 96993 42017 110252 0 152269
10th plan 0 0 0 0 4368 1504 0 5872 1775 409 0 2184 48708 24730 0 73438 9444 105185 0 114629 64295 131828 0 196123
11th Plan 0 0 0 0 5948 1504 1980 9432 4839 411 0 5250 71023 30191 5605 106819 10140 125010 830 135980 91950 157116 8415 257481
12th Plan 6124 0 0 6124 5948 1504 1980 9432 25465 1177 4598 31240 92482 48240 17065 157787 11014 151276 978 163268 141033 202197 24621 367851
13th Plan (Up
to Mar2019)6124 0 0 6124 5948 1504 1980 9432 33692 1512 6605 41809 101335 58238 21173 180746 11734 162552 1010 175296 158833 223806 30768 413407
13th Plan (Up
to Apr-19)6124 0 0 6124 5948 1504 1980 9432 33745 1512 6605 41862 101335 58258 21173 180766 11734 162953 1010 175697 158886 224227 30768 413881
27150 600 MW of 132 kV Inter-Regional power transmission capacity links which are operated radially from time to time is not added in the total
75050
47900
24000
99050
30
Grand Total
Note - The figure upto the end of 10th plan in for stringing progress including the lines not commissioned Now only commissioned lines are reckoned Accordingly the figure for 10th plan (end) may read
as 187555 after adjusting with (-) 10852 Ckm
Inter-regional Power Transfer Capacity (MW)
plusmn 800 kV HVDC plusmn 500 kV HVDC 765 kV 400 kV 220 kV
IR addition in 12th
Plan (up to March
2017)
Inter-regional
Transmission
Capacity at the end
of Plan Period 2017-
22 (as on April19)
IR at the end of 11th
PlanIR at the end of 12th
Plan
IR Capacity Addition
at the end of Plan
Period 2017-22 (Till
April 19)
2004-05 27800
2005-06 28100
2006-07 30200
2007-08 33000
2008-09 35500
2009-10 36700
2010-11 38700
2011-12 41756
2012-13 45460
2013-14 48940
2014-15 53040
2015-16 54590
2016-17 57430
2017-18 60800
2018-19 62890
Year
2005-06
2006-07
2007-08
2008-09
2009-10
2010-11
2011-12
2012-13
2013-14
2014-15
2015-16
2016-17
2017-18
2018-19
2004-05 254 209 7568
2005-06 260 221 7636
2006-07 276 227 7423
2007-08 293 239 7727
2008-09 340 263 8713
2009-10 355 268 8870
2010-11 398 303 11975
2011-12 455 330 13514
2012-13 501 376 14867
2013-14 518 175
2014-15 520
Source- PFC Reports on the performance of State Power Utilities 31
1181
7335
7786
91441
8188
88363
957
1010
1075
1122
1149
(GrossGen+ Net Import) Mid-year population Provisional
5 Average cost of power supply amp average realization ( paiseKWH )
Yearcost of supply
(paiseunit)
Realization(paiseunit)
Including AgricultureOnly
Agriculture
6719
7171
3 All India yearly Coal Consumption for Power Generation (Utilities)
YEARCoal Consumption
Million Tonnes
4 All India Annual per Capita consumption of Electricity Since 2006
Per Capita Consumption ( kWh)
6314
Sl
NoExecuting Agency
Installed
Capacity (MW)Cost (Rs crore)
Date of
Clearance
32
Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as
Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received
from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made
available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified
villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is
independent of the earlier published reports
No Hydro Electric Project has been issued concurrenceAppraisal letter by CEA during April 2019
7 Status of Hydro Schemes Cleared by the CEA in Apr-2019
Name of Scheme
1999-002000-01
297594
010408 to 310309010409 to 310310
10th Plan
2005-062006-07
322968331020
6 Growth Of Rural Electrification amp Pumpsets Energisation
Plan Year
9th Plan2002-03
134092626
4111
Pump Sets Energised Villages Electricfied (Nos)
2001-02
284064367244
1218
27801997-981998-99
3207
482864
12632
1576036
4451722594
15455554
2314176
397343611750
2093311060316074
65109527813884
46708
18423975
499150
2003-042004-05
5743
9769
Cumu upto End of 10th Plan
010407 to 310308
010410 to 310311557976840909
010411 to 310312
412667
86293726
No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification
since 2004-05
65291374575 296361511th Plan
Cumu upto End of 11th Plan
596556 21212860
557439Cummulative up to end of 12th Plan
SN Contents Page
1 Rate of sale of power for the year 2016-17 33-41
RATE OF SALE OF POWER FOR THE YEAR 2016-17
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) NORTHERN REGION
CENTRAL SECTOR
BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 18000 66900 19800
CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 54000 222400 21600
CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 30000 144400 19600
CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 23100 91700 42600
PARBATI - III HPS NHPC LTD HYDRO-HYDRO 52000 68200 54800
DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 28000 95600 30000
CHUTAK NHPC LTD HYDRO-HYDRO 4400 22000 79800
DULHASTI HPS NHPC LTD HYDRO-HYDRO 39000 228000 56400
SALAL HPS NHPC LTD HYDRO-HYDRO 69000 342300 11000
TANAKPUR HPS NHPC LTD HYDRO-HYDRO 9420 43000 29600
URI HPS -I NHPC LTD HYDRO-HYDRO 48000 280300 16000
URI HPS - II NHPC LTD HYDRO-HYDRO 24000 147300 48600
NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 4500 24600 88200
SEWA - II NHPC LTD HYDRO-HYDRO 12000 47100 43400
ANTA CCPP NTPC LTD THERMAL-GASN 41930 67539 32400
AURAIYA CCPP NTPC LTD THERMAL-GASN 66336 53501 39100
BADARPUR TPS NTPC LTD THERMAL-COAL 70500 159153 44800
DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 84000 296170 42300
DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 98000 526686 46300
DADRI CCPP NTPC LTD THERMAL-GASHSD 82978 227469 33000
FARIDABAD CCPP NTPC LTD THERMAL-GASN 43159 115577 30800
RIHAND STPS I NTPC LTD THERMAL-COAL 100000 596766 24500
RIHAND STPS II NTPC LTD THERMAL-COAL 100000 737069 24600
RIHAND STPS III NTPC LTD THERMAL-COAL 100000 706546 30600
SINGRAULI STPS NTPC LTD THERMAL-COAL 200000 1394068 20400
TANDA TPS NTPC LTD THERMAL-COAL 44000 295438 40800
UNCHAHAR TPS I NTPC LTD THERMAL-COAL 42000 256454 39800
UNCHAHAR TPS II NTPC LTD THERMAL-COAL 42000 273577 38900
UNCHAHAR TPS III NTPC LTD THERMAL-COAL 21000 142780 43000
KOLDAM NTPC LTD HYDRO-HYDRO 80000 363260 43600
NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 303575 25841
RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 108000 668677 35374
NJHPS SJVNL HYDRO-HYDRO 150000 699496 23820
RAMPUR HPS SJVNL HYDRO-HYDRO 41202 195982 32260
TEHRI HPP THDC HYDRO-HYDRO 100000 272543 51800
KOTESHWAR HEP THDC HYDRO-HYDRO 40000 106244 53400
IGSTPS JHAJJAR ARAVALI P CPL THERMAL-COAL 150000 510429 49490
NEYVELI BARSINGSAR NEYVELI LIG CORP LTD THERMAL-LIG 25000 127520 38040
STATE SECTOR
PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 21000 14222 48200
PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 21000 19205 48400
PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 25000 102257 42600
PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 25000 62107 41800
DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 60000 312213 41000
RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 120000 35767442200
WYC HYDEL STATION HPGCL HYDRO-HYDRO 6240 20365 24900
GIRI POWER HOUSE HPSEB HYDRO-HYDRO 6000 13958 7600
ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 1695 5467 11900
BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 12000 18528 6700
GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 2250 7462 22500
BASSI POWER HOUSE HPSEB HYDRO-HYDRO 6600 29649 7500
BINWA POWER HOUSE HPSEB HYDRO-HYDRO 600 2749 19300
ANNEXURE-I
RATE OF SALE OF POWER FOR THE YEAR 2016-2017
Page 33
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) GAJ POWER HOUSE HPSEB HYDRO-HYDRO 1050 2914 26700
BANER POWER HOUSE HPSEB HYDRO-HYDRO 1200 2864 16200
HOLI POWER HOUSE HPSEB HYDRO-HYDRO 300 616 22500
THIROT POWER HOUSE HPSEB HYDRO-HYDRO 450 1126 22500
KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 1200 3064 22500
LARJI POWER HOUSE HPSEB HYDRO-HYDRO 12600 53677 23700
NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 250 750 31000
CHABA POWER HOUSE HPSEB HYDRO-HYDRO 175 465 23300
RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 150 101 13400
SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 200 000 22500
KILLAR HPSEB HYDRO-HYDRO 030 050 22500
BHABA AUGUMENP H HPSEB HYDRO-HYDRO 450 1276 22500
BS CHAMBA HPSEB HYDRO-HYDRO 045 099 19500
GUMMA HPSEB HYDRO-HYDRO 300 423 22500
GAS TURBINE POWER STATION IPGCL THERMAL-GAS 27000 67233 39300
PPS-I PPCL THERMAL-GAS 33000 175905 38300
PPS-III PPCL THERMAL-GAS 137120 196879 36100
LOWER JHELUM JampKPDD HYDRO-HYDRO 10500 60214 5100
UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 2260 10514 6300
UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 10500 44202 8500
GANDHARBAL JampKPDD HYDRO-HYDRO 1500 8925 4700
KARNAH MPH JampKPDD HYDRO-HYDRO 200 1122 31000
CHENANI I JampKPDD HYDRO-HYDRO 2330 10892 6600
CHENANI II JampKPDD HYDRO-HYDRO 200 1188 9300
CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 750 3634 14200
IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 375 2108 18500
IGO MERCHELLONG JampKPDD HYDRO-HYDRO 300 1572 29700
PAHALGAM MHP JampKPDD HYDRO-HYDRO 450 1713 32900
MARPACHOO JampKPDD HYDRO-HYDRO 075 375 29800
HAFTAL JampKPDD HYDRO-HYDRO 100 483 28700
SANJAK JampKPDD HYDRO-HYDRO 126 441 36000
SEWA-III JampKPDD HYDRO-HYDRO 900 3273 20200
BHADERWAH JampKPDD HYDRO-HYDRO 150 935 8900
BAZGO JampKPDD HYDRO-HYDRO 030 108 33300
SUMOOR JampKPDD HYDRO-HYDRO 010 045 35400
HUNDER JampKPDD HYDRO-HYDRO 040 176 26200
STAKNA JampKPDD HYDRO-HYDRO 400 1933 4100
KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 124000 662879 31360
SURATGARH TPS RRVUNL THERMAL-COAL 150000 402328 41730
CHHABRA TPS 1amp 2 RRVUNL THERMAL-COAL 50000 305946 36700
CHHABRA TPS 3 RRVUNL THERMAL-COAL 25000 151536 36700
CHHABRA TPS 4 RRVUNL THERMAL-COAL 25000 155896 36700
RAMGARH GT POWER PROJECT RRVUNL THERMAL-COAL 22050 43177 41800
RAMGARH GAS T P PROJECT 3 RRVUNL THERMAL-GAS 5000 93615 41800
DHOLPUR C C POWER PROJECT RRVUNL THERMAL-R-LNG 33000 9486 46110
MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 14000 20855 34192
MINI MICRO HYDEL (MMH) P S RRVUNL HYDRO-HYDRO 2385 851 37800
KALISINDH TPP 1 RRVUNL THERMAL-COAL 60000 341543 45000
KALISINDH TPP 2 RRVUNL THERMAL-COAL 60000 211588 45000
KHARA HEP UPJVNL HYDRO-HYDRO 7200 26654 7200
MATATILLA HEP UPJVNL HYDRO-HYDRO 3060 12219 6500
OBRA HEP UPJVNL HYDRO-HYDRO 9900 21517 6300
RIHAND UPJVNL HYDRO-HYDRO 30000 57369 5500
ANPARA A TPS UPRVUNL THERMAL-COAL 63000 317536 27000
ANPARA B TPS UPRVUNL THERMAL-COAL 100000 705605 22700
ANPARA D UPRVUNL THERMAL-COAL 100000 300158 39800
HARDUAGANJ TPS UPRVUNL THERMAL-COAL 16500 45817 49200
HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 50000 304389 46600
OBRA A TPS UPRVUNL THERMAL-COAL 28800 13158 34000
OBRA B TPS UPRVUNL THERMAL-COAL 100000 328124 21900
Page 34
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) PANKI TPS UPRVUNL THERMAL-COAL 21000 66488 50300
PARICHHA TPS UPRVUNL THERMAL-COAL 22000 38762 49400
PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 42000 231931 45600
PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 50000 276722 50400
CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 24000 70845 8290
CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 14400 75366 8390
DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 3375 9595 12080
DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 5100 18701 10520
KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4140 17359 12330
KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 12000 33001 9420
KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 3000 11953 8320
TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 9000 33983 12460
MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 30400 124510 16110
RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 19800 17897 10550
MPUR UTTARAKHAND JVNL HYDRO-HYDRO 930 5121 19200
PATHRI UTTARAKHAND JVNL HYDRO-HYDRO 2040 11636 14200
GALOGI UTTARAKHAND JVNL HYDRO-HYDRO 300 648 12500
PRIVATE SECTOR
MGTPP CLP INDIA PVT LTD THERMAL-COAL 132000 268902 41940
SHRINAGAR HEP ALAKNANDA HPCL HYDRO-HYDRO 33000 127414 48800
GAMA INFRAPROP CCPP GAMA INFRAPROP PVT THERMAL-GAS 22500 52686 47000
PPGCL (BARA) JP POWER VENTURES LTD THERMAL-COAL 198000 448200 38500
MALANA HEP MALANA PCL HYDRO-HYDRO 8600 26354 29792
MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 10000 30369 32580
ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 19200 56347 36079
KASHANG HEP H P PCL HYDRO-HYDRO 19500 5034 29200
BASPA-II HEP HBPCL HYDRO-HYDRO 30000 132769 13600
KARCHAM WANGTOO HEP HBPCL HYDRO-HYDRO 100000 434386 36600
RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 108000 582600 43700
RITHALA COMBI CY POWER PLANT TATA POWER DDL THERMAL-GAS 9480 000 11900
RAJPURA TPS NABHA POWER LTD THERMAL-GAS 140000 901484 39000
TALWANDI SABO POWER LTD TALWANDI SABO POWER LTD THERMAL-COAL 198000 636040 49548
ROJA THERMAL POWER STATION ROJA POWER SCL THERMAL-COAL 120000 727200 43400
KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 34400 63400
BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 36000 62600
MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 38200 60800
UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 37900 61500
KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 42300 58800
LALITPUR PGCL BAJAJ ENERGY PVT LTD THERMAL-COAL 198000 359400 47300
PRAYAGRAJ PGCL PRAYAGRAJ PGCL THERMAL-COAL 132000 448200 38595
KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 132000 783182 33438
WESTERN REGION
CENTRAL SECTOR
INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 100000 325333 23892
OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 52000 141663 34001
GANDHAR CCPP NTPC LTD THERMAL-GAS 65739 221924 28700
KAWAS CCPP NTPC LTD THERMAL-GASN 65620 167929 27000
KORBA I amp II NTPC LTD THERMAL-COAL 210000 1499171 20500
KORBA III NTPC LTD THERMAL-COAL 50000 358746 26600
SIPAT STPS I NTPC LTD THERMAL-COAL 198000 1479902 26800
SIPAT STPS II NTPC LTD THERMAL-COAL 100000 766549 26500
VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 126000 693142 25800
VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 100000 608781 23800
VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 100000 673475 27600
VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 100000 655924 32900
VINDHYACHAL STPS V NTPC LTD THERMAL-COAL 50000 328265 31700
MOUDA I NTPC LTD THERMAL-COAL 100000 343130 44500
MOUDA Ii NTPC LTD THERMAL-COAL 66000 40637 39900
RATNAGIRI GAS amp POWER PVT LTD RGPPL THERMAL-GAS 196708 442485 47000
KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 000 24729
TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 32000 201227 10740
Page 35
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 365122 19069
TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 787444 29324
STATE SECTOR
GSEG-HAZIRA15610 MW GUJARAT S ENEGEN LTD THERMAL-GAS 15610 1805 28200
GSEG-HAZIRA35143 MW GUJARAT S ENEGEN LTD THERMAL-GAS 35130 22276 51300
GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 21978 51800
AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 13929 26100
KORBA TPS EAST CSPGCL THERMAL-COAL 44000 198673 33880
DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 365808 27570
KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 316500 30420
HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 532878 19410
CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 515 58300
MTTPS CHAMPA U-I CSPGCL THERMAL-COAL 50000 220376 39000
MTTPS CHAMPA U-II CSPGCL THERMAL-COAL 50000 23709 10000
SHP GANGREL CSPGCL HYDRO-HYDRO 1000 2350 36790
BANGO HEP CSPGCL HYDRO-HYDRO 12000 14662 8900
MHP KORBA WEST CSPGCL HYDRO-HYDRO 170 859 38190
SIKASAR HEP CSPGCL HYDRO-HYDRO 700 418 26870
DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8843 74500
DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 19446 51500
GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 66388 71600
GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127488 41300
KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 96072 43900
KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 29841 56400
SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 184966 58800
UKAI 1-5 GSECL THERMAL-COAL 85000 204891 46900
UKAI TPS 6 GSECL THERMAL-COAL 50000 284448 48200
WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 271999 58300
WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 82808 44100
KADANA HPS GSECL HYDRO-HYDRO 24200 34433 16800
UKAI HPS GSECL HYDRO-HYDRO 30500 40585 6100
TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 123000 11500
BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 8900 10900
BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 7200 27500
JHINNA HPS MPPGCL HYDRO-HYDRO 2000 9700 18500
RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 44300 3400
GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 17300 4600
SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 4100 16900
MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 14600 27000
PENCH HPS MPPGCL HYDRO-HYDRO 16000 23700 8100
RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 3000 16900
AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 134400 35100
SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 283800 38700
SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 344600 34300
SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 111600 61600
SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 211800 58000
SSTPS PH-I MPPGCL THERMAL-COAL 120000 233100 84300
BHUSAWAL TPS MSPGCL THERMAL-COAL 142000 566258 51100
CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1365682 33700
KHAPERKHEDA MSPGCL THERMAL-COAL 134000 706207 39100
KORADI TPS MSPGCL THERMAL-COAL 62000 443206 42000
NASIK TPS MSPGCL THERMAL-COAL 63000 297275 47000
PARLI TPS MSPGCL THERMAL-COAL 113000 175934 71600
PARAS MSPGCL THERMAL-COAL 50000 267931 38700
URAN CCPP MSPGCL THERMAL-GAS 67200 320330 30600
KOYANA MSPGCL HYDRO-HYDRO 195600 328155 13100
SMALL HYDRO POWER PLANTS MSPGCL HYDRO-HYDRO 45400 93062 30500
BHIRA MSPGCL HYDRO-HYDRO 8000 10046 8400
TILLARI MSPGCL HYDRO-HYDRO 8900 10584 3100
SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 233298 20500
SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 87633 20500
PRIVATE SECTOR
Page 36
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 81282 46750
JNSTPP(JAYPEE NIGRIE) JP POWER VENTURES LTD THERMAL-COAL 132000 726695 29310
MB POWER MB POWER THERMAL-COAL 120000 345632 38310
ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 754922 28671
ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 780761 23495
ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 198000 1263784 32090
ADANI POWER MAHARA ADANI POWER LTD THERMAL-COAL 330000 1666191 34124
AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 170065 36827
SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 252035 45129
ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 458551 36000
ESSAR POWER MP LTD ESSAR POWER MP LTD THERMAL-COAL 60000 243040 28600
VEDANTA LTD (P P -I) VEDANTA LTD THERMAL-GAS 3000 15044 24000
VEDANTA LTD (P P -II) VEDANTA LTD THERMAL-GAS 3000 21293 24000
PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 8234600 24000
165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 5850 64390
145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 68717 40349
SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 132655 28776
SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 144686 38567
MUNDRA UMPPCOASTAL GUJARAT POWER
LTD THERMAL-IMP COAL 400000 2530300
23900
LANCO AMARKANTAK TPP PATHADIH
U-ILANCO AMARKAN POWER LTD THERMAL-COAL 30000 195500
29200
LANCO AMARKANTAK TPP PATHADIH
U-IILANCO AMARKAN POWER LTD THERMAL-COAL 30000 206900
27600
BARADARHA TPS D B POWER LTD THERMAL-COAL 120000 677373 29200
JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 405000 28900
JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 453000 40500
DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 339437 40700
TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 293400 44000
TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 137200 37000
TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 174900 44000
BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 92900 14100
BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23700 34300
KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 27600 48300
CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2530300 23900
BHANDARDRA HEP -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 2475 54900
SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 161400 26500
SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 445000 39000
SOTHERN REGION
CENTRAL SECTOR
NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 325699 54820
NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 305532 39880
NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 998805 38510
NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 113016 54070
NEYVELI TAMILNADU POWER LTD JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 625274 42200
VALLUR TPS NTPC TECL THERMAL-COAL 150000 856438 42350
R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 1493 84300
RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1502919 29400
RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 341291 31800
SIMHADRI I NTPC LTD THERMAL-COAL 100000 688382 36800
SIMHADRI II NTPC LTD THERMAL-COAL 100000 663657 43400
KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 593110 31324
MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 291625 21764
KKNPP-1 amp 2 NPCIL NUCLEAR-NUCLEAR 200000 572609 40948
MINICOY LAKSHADEEP THERMAL-DIESEL 340 770 29600
KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1097 29600
AMINI LAKSHADEEP THERMAL-DIESEL 265 509 29600
ANDROTT LAKSHADEEP THERMAL-DIESEL 219 524 29600
KALPENI LAKSHADEEP THERMAL-DIESEL 175 356 29600
AGATTI LAKSHADEEP THERMAL-DIESEL 195 658 29600
KADMAT LAKSHADEEP THERMAL-DIESEL 190 414 29600
KILTAN LAKSHADEEP THERMAL-DIESEL 150 269 29600
CHETLET LAKSHADEEP THERMAL-DIESEL 100 139 29600
BITRA LAKSHADEEP THERMAL-DIESEL 043 024 29600
BANGARAM LAKSHADEEP THERMAL-DIESEL 018 009 29600
Page 37
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) STATE SECTOR
Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 721811 46500
Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 50000 336142 46500
RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 237358 46500
RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 239926 46500
RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 124500 46500
SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 62109 46500
UPPER SILERU APGENCO HYDRO-HYDRO 24000 33000 46500
LOWER SILERU APGENCO HYDRO-HYDRO 46000 81066 46500
DONKARAI APGENCO HYDRO-HYDRO 2500 6007 46500
PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 1262 46500
CHETTIPETA APGENCO HYDRO-HYDRO 100 214 46500
MUCHKUND APGENCO HYDRO-HYDRO 12000 37571 46500
NAGARJUNASAGAR RCPH APGENCO HYDRO-HYDRO 9000 606 46500
TUNGABHADRA HES amp HAMPI(AP
Share)
APGENCO HYDRO-HYDRO 7200 6100 46500
KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 352232 42600
KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 288131 32500
KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 319272 46500
RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 40073 44300
KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 308317 46000
KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 308963 51300
SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 61004 76600
NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 17960 75300
PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 20873 58300
POCHAMPAD-I TSPGENCO HYDRO-HYDRO 2700 5455 29800
POCHAMPAD-II TSPGENCO HYDRO-HYDRO 900 1932 40700
NIZAMSAGAR TSPGENCO HYDRO-HYDRO 1000 1126 53400
RAICHUR TPS 1 to 7 KPCL THERMAL-COAL 147000 890866 43800
RAICHUR TPS 8 KPCL THERMAL-COAL 25000 159523 48200
BELLARI TPS 1 KPCL THERMAL-COAL 50000 318679 51100
BELLARI TPS 2 KPCL THERMAL-COAL 50000 232347 55600
BELLARI TPS 3 KPCL THERMAL-COAL 70000 47565 34400
BHADRA PH KPCL HYDRO-HYDRO 3920 2369 45900
GERUSUPPA PH KPCL HYDRO-HYDRO 24000 26990 22000
GHAT PRABHA HEP KPCL HYDRO-HYDRO 3200 4777 25300
KADRA HPS KPCL HYDRO-HYDRO 15000 16889 26800
NAGJHARI KPCL HYDRO-HYDRO 90000 155159 9800
KODASALLI DPH KPCL HYDRO-HYDRO 12000 14854 19200
MUNIRA+MGH+SPH+SPH KPCL HYDRO-HYDRO 22640 48211 7900
SHARAVATHY HPS KPCL HYDRO-HYDRO 108550 276215 5400
ALMATTI DPH KPCL HYDRO-HYDRO 29000 39611 24600
VARAHI UGPH KPCL HYDRO-HYDRO 46000 71368 15600
IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 17196 15300
IDUKKI HPS KSEB HYDRO-HYDRO 78000 137905 15300
KAKKAD HPS KSEB HYDRO-HYDRO 5000 13063 15300
KALLADA HPS KSEB HYDRO-HYDRO 1500 4436 15300
KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 46544 15300
KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 635 15300
LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 30822 15300
MALANKARA HPS KSEB HYDRO-HYDRO 1050 2474 15300
MATTUPETTY KSEB HYDRO-HYDRO 200 230 15300
MALAMPUZHA KSEB HYDRO-HYDRO 250 063 15300
CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 864 15300
URUMI ST I amp II KSEB HYDRO-HYDRO 615 903 15300
LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 248 15300
NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7765 19625 15300
PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 16601 15300
PANNIAR HPS KSEB HYDRO-HYDRO 3240 6217 15300
PORINGALKUTHU KSEB HYDRO-HYDRO 3600 10052 15300
PORINGALKUTHU LBE KSEB HYDRO-HYDRO 1600 9438 15300
PEPPARA KSEB HYDRO-HYDRO 300 395 15300
POOZHITHODE KSEB HYDRO-HYDRO 480 1045 15300
Page 38
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) PEECHI KSEB HYDRO-HYDRO 125 040 15300
RANI-PERUNADU KSEB HYDRO-HYDRO 400 585 15300
SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 79783 15300
SENGULAM HPS KSEB HYDRO-HYDRO 5120 11558 15300
SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 16711 15300
VILANGAD KSEB HYDRO-HYDRO 750 1578 15300
BARAPOLE KSEB HYDRO-HYDRO 1500 1932 15300
VELLATHOOVAL KSEB HYDRO-HYDRO 360 305 15300
CHIM0NY KSEB HYDRO-HYDRO 250 156 15300
ADYANPARA KSEB HYDRO-HYDRO 350 501 15300
BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 554 15300
KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 3801 15300
KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 23132 32800
ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 14416 62280
METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 523970 62280
METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 321270 62280
NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 336575 62280
NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 591240 62280
TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 508966 62280
KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 30897 62280
VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 18720 90699 62280
KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 33593 62280
BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 1047 62280
PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 1250 62280
PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 330 62280
MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 4897 62280
MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 032 62280
KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15681 62280
KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 40608 62280
KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 21342 62280
KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 4717 62280
KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4322 62280
KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2399 62280
METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 4416 62280
METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 8035 62280
BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2187 62280
BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2359 62280
BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2511 62280
BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 1949 62280
BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 1819 62280
POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 172 62280
SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 241 62280
MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 026 62280
THIRUMOORTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 136 62280
PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 9309 62280
VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 353 62280
SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 4192 62280
PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 6571 62280
SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 1186 62280
SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6319 62280
ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 6122 62280
KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 28674 62280
SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 18381 62280
SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 4258 62280
KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 12680 62280
KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4201 62280
ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 000 62280
PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 19175 62280
AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 078 62280
BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 504 62280
BHAVANI KATTALAI (BKB)(IIIampIII BB I amp II)TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 5847 62280
PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 000 62280
Page 39
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) SRI DAMODARAM STPS APPDCL THERMAL-COAL 160000 808108 36300
PRIVATE SECTOR
KARUPPUR TANJORE LANCO TANJORE PCL THERMAL-GAS 12000 48096 28770
SIMHAPURI ENERGY LTD SIMHAPURI ENERGY LTD THERMAL-COAL 60000 143900 39100
JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 7111 45500
SBU 1 JSW ENERGY LTD
VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 26000 159100
43300
SBU 2 JSW ENERGY LTD
VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 60000 247900
42800
LANCO KPLLANCO KONDAPALLI POWER
LTDTHERMAL-GAS 36814 85060
25776
LANCO KPL STG -IILANCO KONDAPALLI POWER
LTDTHERMAL-GAS 36600 12979
46330
LANCO KPL STG -IIIALANCO KONDAPALLI POWER
LTDTHERMAL-GAS 37100 85710
46330
LANCO KPL STG -III BLANCO KONDAPALLI POWER
LTDTHERMAL-GAS 37100 43639
46330
HINDUJA NATIONAL PCL HINDUJA NATIONAL PCL THERMAL-COAL 104000 303000 38200
MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 121164 49940
UDUPI POWER COR LTD ADANI POWER LTD THERMAL-COAL 120000 754613 42500
SPECTRUM POWER GENERATION
LTD SPECTRUM PG LTD THERMAL-GASN 20525 9256812
34952
TAQA NEYVELI POWER COM PVT
LTD TAQA NEYVELI THERMAL-LIG 25000 5840
34500
ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 251000 51000
ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 207860 36800
GMR VEMAGIRI POWER GENERATION
LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 30117
46450
EASTERN REGION
CENTRAL SECTOR
MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 64675 53113
MTPS STAGE - II KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 39000 1432 69138
BOKARO `B` TPS DVC THERMAL-COAL 63000 145670 31539
MEJIA TPS U 1-3 DVC THERMAL-COAL 63000 348298 31552
MEJIA TPS U 4 DVC THERMAL-COAL 21000 116099 34997
MEJIA TPS U 5-6 DVC THERMAL-COAL 50000 276427 35976
MEJIA TPS U 7-8 DVC THERMAL-COAL 100000 552854 36991
DURGAPUR STEEL TPS DVC THERMAL-COAL 100000 665550 39323
DURGAPUR TPS DVC THERMAL-COAL 21000 59270 35416
RAGHUNATHPUR TPS DVC THERMAL-COAL 120000 201650 35326
MAITHON HYDEL STA DVC HYDRO-HYDRO 6320 12200 17984
CHANDRAPURA TPSU1-3 DVC THERMAL-COAL 42000 257610 35095
CHANDRAPURA TPSU7-8 DVC THERMAL-COAL 50000 306673 34987
KODERMA TPS DVC THERMAL-COAL 100000 380180 38131
PANCHET HPS DVC HYDRO-HYDRO 8000 13360 17984
TILLAYA HPS DVC HYDRO-HYDRO 400 1410 17984
RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34700 35400
TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 277300 23200
TLDP -III NHPC LTD HYDRO-HYDRO 13200 55400 62000
TLDP -IV NHPC LTD HYDRO-HYDRO 16000 60300 25600
FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 957219 33700
FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 308943 41000
BONGAINGAON TPS NTPC LTD THERMAL-COAL 25000 153663 58600
KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 542277 34200
KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 942591 34200
BARH-II NTPC LTD THERMAL-COAL 132000 728021 44500
TALCHER TPS NTPC LTD THERMAL-COAL 46000 335521 30100
TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 702319 25600
TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1436521 24700
STATE SECTOR
BTPS(RampM) BIHAR STATE PGCL THERMAL-COAL 22000 12142 39700
BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 98331 10602
HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 50593 9482
CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 19689 2605
RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 53192 6033
UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 147208 14637
Page 40
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 60353 4519
IB TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 288567 25000
J P H GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 210 038 61100
MEYONG CHU GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 400 1086 61100
TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 122667 38200
DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 214339 43321
KOLAGHAT THERMAL POWER
STATION
WEST BENGAL PDCL THERMAL-COAL 126000 538269 31603
BAKRESHWAR THERMAL POWER
PLANT
WEST BENGAL PDCL THERMAL-COAL 105000 634876 32154
BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 45000 166855 33299
SANTHALDIH THERMAL POWER
STATION
WEST BENGAL PDCL THERMAL-COAL 50000 336442 34932
SAGARDIGHI THERMAL POWER
PROJECT
WEST BENGAL PDCL THERMAL-COAL 160000 423121 34705
JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 20344 68900
RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 24559 68900
TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 4623 68900
PURULIA PUMPED STORAGE
PROJECT
WEST BENGAL SEDCL HYDRO-HYDRO 90000 108816 68900
MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2768 68900
PRIVATE SECTOR
CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 49474 20230
CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 555500 70200
HALDIA ENERGY HALDIA ENERGY LTD THERMAL-COAL 60000 371000 50400
DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3688 63400
KAMALANGA TPS GMR KAMALANGA ENERGY LTD THERMAL-COAL 105000547670
33300
ADHUNIK POWER U-1 ADHUNIK POWER THERMAL-COAL 27000 158 44060
ADHUNIK POWER U-2 ADHUNIK POWER THERMAL-COAL 27000 168 44250
VL-JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 332800 23622
JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 43000 45250
JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 71700 37030
JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 70700 35920
JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 71100 38870
JOJOBERA UNIT 5 TATA POWER COM LTD THERMAL-COAL 12000 79300 44560
JOJOBERA UNIT 6 TATA POWER COM LTD THERMAL-WHR 12000 83700 12840
IEL KALINGANAGAR U-I TATA POWER COM LTD THERMAL-WG 6750 33400 22500
IEL KALINGANAGAR U-II TATA POWER COM LTD THERMAL-WG 6750 34800 22500
MAITHON UNIT 1 amp 2 TATA POWER COM LTD THERMAL-COAL 105000 678000 36100
HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 27500 24340
HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 28400 24340
HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 15800 24310
NORTH EASTERN REGION
CENTRAL SECTOR
LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 74100 36600
AGARTALA GT NEEPCO THERMAL-GAS 13500 88611 27210
ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 153111 32310
DOYANG HEP NEEPCO HYDRO-HYDRO 7500 25598 49801
KOPILI HEP NEEPCO HYDRO-HYDRO 20000 98186 11491
KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 19582 20237
KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 10310 17968
RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 124093 22945
TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 10100 17344 39000
STATE SECTOR
HYDRO POWER (122 Stns) ITANAGAR GOVT OF ARUNACHAL
PRADESHHYDRO-HYDRO 6971 6217270
24600
KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39514 17337
LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 82327 36810
NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 33318 48290
MYNTRIANG SHEP ST II ASSAM POWER GENCO HYDRO-HYDRO 300 567 35776
LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 9130 49200
LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 012 49200
DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 022 49200
TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 000 49200
UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 4990 16000
UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 6476 37000
UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 16494 14600
UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 3600 9556 15000
SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 758 8000
MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44070 44800
KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 154 41400
TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 091 41400
MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 411 41400
MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 394 41400
KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 760 41400
SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 3264 41400
LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 044 41400
BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 18953 28000
ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 43585 28200
GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 4080 11100
Note
LIG Lignite N Naptha WHR Waste Heat Recovery
Page 41
SN Contents Page
1Electricity Generation (Conventional Sources) for Apr-2019 (BU) 1
2 Generating Capacity Addition for Apr-2019 (MW) 2
3 List of Projects Commissioned in Apr-2019 3
4 All India Installed Capacity (MW) Region-wise as on 30-04-19 3
5 All India Installed Capacity (MW) Sector-wise as on 30-04-19 4
6 Transmission Lines Added during Apr-2019 (Ckms) 5
7 Transformation Capacity Addition during Apr-2019 (MVA) 6
8 Power Supply Position (Energy amp Peak) in Apr-2019 7
9 Peak Shortage of Power Supply (MW) in Different Regions 8-9
10 All India PLF Sector-wise for Apr-2019 10
11 T amp D and AT amp C Losses ()
12 All India Village Electrification
13 Average cost of Power amp Average Realisation
14 All India Coal consumption for Power Generation (MT)
Section A - Highlights of Power Sector
11
Achievement
Apr-19
Thermal 9442 152
Nuclear 318 -390
Hydro 1109 4680
Bhutan Import 024 94659
All India 10893 485
Type
Thermal
Nuclear
Hydro
Bhutan Import
All India
1A
9300
9300
1 Electricity Generation for Apr-2019 (BU)
Apr-19
TypeAchievement
Apr-18
Targets Change of
Achievement
wrt Apr-2018
9896
002
3673
11235
756
331
9539
48510891039
10389
018
9442
3177
152
Change wrt Apr-18 to Apr-18
Electricity Generation During Apr-18 to Apr-18 amp Apr-19 to Apr-19 (BU)
Apr-18 to Apr-18 Apr-19 to Apr-19
11092
024002
-390331
4680756
94247
10389
10893
10100
10200
10300
10400
10500
10600
10700
10800
10900
11000
BU
Apr-18 Apr-19
10391089
00
200
400
600
800
1000
1200
BU
Apr-18 to Apr-18 Apr-19 to Apr-19
Generation from
Conventional
Sources
Generation
from
Renewable
Sources
Total Generation from
Conventional Sources
Generation from
Renewable SourcesTotal
Growth in
Conventional
Generation
Growth in
Renewable
Generation
Growth in
Total
Generation
(BU) (BU) (BU) (BU) (BU) (BU) () () ()
108929 9900 118829 103889 8443 112332 485 1726 578
Note Tentative
SlNo
Source-Wise All
India
Generation
from
Renewables Mar-2019 Mar-2018 April 2018 to March 2019 April 2017 to March 2018
1 Wind 2965930 2906760 62036380 52666090
2 Solar 4307980 3311530 39268200 25871070
3 Biomass 255320 270430 2763820 3404950
4 Bagasse 1814860 1794220 13562670 11847350
5 Small Hydro 473060 376850 8702750 7691580
6 Others 30700 33120 425280 358450
Total 9847850 8692910 126759100 101839490
Note 1) Data as received from SLDCElectricity Department of the respective states or from the electricity department
2) 25 MW Khopli-II project of NEEPCO located in Assam is considered under Small Hydro wef 01072018 Earlier it was considered under Hydro
3) Previous month generation has been taken as SLDC has not furnished generation data for the current month
Electricity Generation (Conventional and Renewable Sources)
Apr-2019 Apr-2018 Growth
1B
For the Month of Cummulative for the period
All India Generation From Renewables (All Figures are in MU)
Achievement Targets Achievement
Apr-18
Thermal 69755 1160 0 000
Hydro 0 0 0 NA
Nuclear 0 0 0 NA
All India 69755 1160 0 000
Apr-18 to Apr-18 Apr-19 to Apr-19 Change wrt Previous Year
Thermal 69755 0 00
Hydro 0000 0 NA
Nuclear 0000 0 NA
All India 69755 0 00
2
2 Generating Capacity Addition for Apr-2019 (MW)
Generating Capacity Addition during Apr-18 to Apr-18 amp Apr-19 to Apr-19
NA- Not Applicable
Achivement
wrt Apr-2018Type
Apr-19
698
000
10
20
30
40
50
60
70
80
1Apr-18 Apr-19
0000
10000
20000
30000
40000
50000
60000
70000
80000
Apr-18 to Apr-18 Apr-19 to Apr-19
1
2
3
Nuclear Hydro RES Grand TotalRegion Coal Lignite Gas Diesel Total
Northern 5036020 158000 578126 000 5772146 162000 1970777 1419902 9324825
Western 7280862 154000 1080649 000 8515511 184000 754750 2307894 11762155
Southern 4304202 314000 647366 56158 5321726 332000 1177483 3862018 10693227
Eastern 2746364 000 10000 000 2756364 000 494212 140148 3390724
North-East 77002 000 177581 3600 258183 000 142700 32429 433311
Islands 000 000 000 4005 4005 000 000 1773 5778
ALL INDIA 19444450 626000 2493722 63763 22627934 678000 4539922 7764163 35610019
Note Captive Genaration is not included in the total Captive Power capacity as on 31032017 RES as on 31032019 3
Thermal
Nuclear
3 List of Projects Commissioned During Apr-2019
4 All India Installed Capacity (MW) Region-wise as on 30-04-19
NIL
NIL
Thermal
NIL
Hydro
22627934
678000
4539922
7764163
35610019
51529
000
5000000
10000000
15000000
20000000
25000000
30000000
35000000
40000000
Thermal Nuclear Hydro RES Total Captive
Thermal Nuclear Hydro RES Total Captive
Total = 356100189
Sector
Coal Lignite Gas Diesel Total
State 6407650 129000 711871 36393 7284913 000 2987880 234793 10507586
Private 7468800 183000 1058060 27370 8737230 000 339400 7366140 16442770
Central 5568000 314000 723791 000 6605791 678000 1212642 163230 8659663
All India 19444450 626000 2493722 63763 22627934 678000 4539922 7764163 35610019
State 10507586
Private 16442770
Central 8659663
Electricity Generation (MU) Targets and Achievements for 2016-17
5 All India Installed Capacity (MW) Sector-wise as on 30-04-19
4
Grand TotalTHERMAL
Nuclear Hydro RES
RES as on 31032019
State 10507586 30
Private 16442770 46
Central 8659663 24
All India Installed Capacity(MW) (Sector-Wise)
Voltage Level
+- 500 KV HVDC
+- 800 KV HVDC
765 KV
400 KV
220 KV
All India
Voltage Level
+- 500 KV HVDC
+- 800 KV HVDC
765 KV
400 kV
220 KV
All India
5
481 401
763 474
0 0
242 53
40 20
0 0
242 53
40 20
481 401
763 474
Transmission Lines Added duringApr-18 to Apr-18 ampApr-19 to Apr-19 (Ckms)
Apr-18 to Apr-18 Apr-19 to Apr-19
0 0
6 Transmission Lines Added during Apr-2019 (Ckms)
Apr-18 Apr-19
0 0
763
474
0
100
200
300
400
500
600
700
800
900
All India
Ckm
s
Apr-18 Apr-19
763
474
0
100
200
300
400
500
600
700
800
900
All India
Ckm
s
Apr-18 to Apr-18 Apr-19 to Apr-19
Voltage Level
+- 800 KV HVDC
+- 500 KV HVDC
765 KV
400 KV
220 KV
All India
Voltage Level
+- 800 KV HVDC
+- 500 KV HVDC
765 KV
400 KV
220 KV
All India
6
0 0
All India Transformation Capacity Addition during Apr-18 to Apr-18 amp Apr-19
to Apr-19 (MVA)
4600
0
500
2795
1305
5470
4000
185
1285
0
Apr-18 to Apr-18 Apr-19 to Apr-19
5470
0
500
4600
2795
1305
7 Transformation Capacity Addition During Apr-2019 (MVA)
0
4000
185
1285
0 0
Apr-18 Apr-19
5470
4600
4000
4200
4400
4600
4800
5000
5200
5400
5600
MV
A
Apr-18 Apr-19
5470 4600
0
74520
1
MV
A
Apr-18 to Apr-18 Apr-19 to Apr-19
Apr-2018 Apr-2019 Apr-2018 Apr-2019 Apr-2018 Apr-2019
Northern 28590 30094 28170 29786 -15 -10
Western 33235 34875 33233 34868 00 00
Southern 29211 31111 29166 31109 -02 00
Eastern 11752 12851 11650 12850 -09 00
North Eastern 1225 1300 1174 1228 -42 -55
All India 104013 110231 103393 109842 -06 -04
Apr-2018 Apr-2019 Apr-2018 Apr-2019 Apr-2018 Apr-2019
Northern 48824 54476 48367 53985 -09 -09
Western 50654 56242 50434 56222 -04 00
Southern 45946 49155 45684 49103 -06 -01
Eastern 21320 23349 21275 23349 -02 00
North Eastern 2600 2848 2552 2780 -18 -24
All India 162492 177411 161286 176810 -07 -03
Apr-2019 Figures are Provisional
7
8 Power Supply Position (Energy amp Peak) in Apr-2019
Peak Demand Peak Met
Requirement Availability
Energy (MU)Region
Surplus(+)
Deficit (-) in
Surplus(+)
Deficit (-) in Region
Power (MW)
Chandigarh Delhi Haryana HP JampK Punjab Rajasthan UP Utrakhand Apr-2018 0 0 0 0 546 0 0 247 0
Apr-2019 0 0 0 0 565 0 0 0 0
Chattisgarh Gujarat MP Maharashtra Daman amp Diu Dadar Nagar Goa
Apr-2018 13 11 3 99 0 0 0
Apr-2019 22 6 0 8 1 0 0
AP Telangana Karnataka Kerala Tamil Nadu Puducherry Lakshadweep
Apr-2018 22 0 2 0 0 20 0
Apr-2019 0 0 0 8 0 2 0
8
9 Peak Shortage of Power Supply (MW) in Different Regions in Apr-2019
0 0 0 0
565
0 0 0 00 0 0 0
546
0 0
247
0
0
400
800
Ch
an
dig
ar
h Delh
i
Ha
rya
na
HP
Jamp
K
Pu
nja
b
Ra
jasth
an
UP
Utr
akhan
d
MW
Northern States (MW) Apr-2019 Apr-2018
22
6 0 8 1 0 0
13
11
3
99
0 0 0
0
50
100
150
Ch
attis
gar
h
Guja
rat
MP
Mah
ara
shtr
a
Da
man amp
Diu
Da
dar
Na
gar G
oa
MW
Western States (MW) Apr-2019 Apr-2018
0 0 08
0 2 0
22
0 2 0 0
20
00
50
AP Telangana Karnataka Kerala Tamil Nadu Puducherry Lakshadweep
Southern State (MW) Apr-2019 Apr-2018
Bihar DVC Jharkhand Odisha West Bengal Sikkim AampN Island
Apr-2018 0 39 0 0 7 0 4
Apr-2019 0 0 0 0 0 0 4
Arunachal Assam Manipur Meghalaya Mizoram Nagaland Tripura
Apr-2018 5 30 7 0 9 29 4
Apr-2019 3 45 9 0 3 26 1
9
0 0 0 0 0 0
4
0
39
0 0
7
0
4
01020304050
Bih
ar
DV
C
Jha
rkh
an
d
Od
ish
a
We
st
Be
ng
al
Sik
kim
Aamp
NIs
land
MW
Eastern States (MW) Apr-2019 Apr-2018
3
45
9
0 3
26
1
5 7
0
9
29
4
0
10
20
30
40
50
Aru
na
cha
l
Assa
m
Ma
nip
ur
Me
gh
ala
ya
Miz
ora
m
Na
gala
nd
Trip
ura
MW
North-Eastern States (MW)
Sector Apr-2018 Apr-2019
Central 7634 7459
State 6438 6142
Private Sector IPP 5525 6005
Private Sector UTL 6815 6440
ALL INDIA 6454 6471
Month PLF 2018 PLF 2019
Jan 6215 6054
Feb 6230 6051
March 6452 6340
April 6454 6471
For Coal and Lignite based Power Plants and Provisional based on Actual-Cum-Assesment
10
PLF of Thermal Power Plants
(excluding gas based power plants)
All India PLF of Thermal Plants (Excluding Gas Based Plants) Month-wise
10 All India Thermal PLF Sector-wise (Excluding Gas Based Power Plants) for Apr-2019
5800
6000
6200
6400
6600
Jan Feb March April
Months
All India PLF Month-wise
PLF 2018 PLF 2019
7634
64385525
6815 6454
7459
6142 60056440 6471
000
2000
4000
6000
8000
10000
Central State Private Sector IPP Private Sector UTL ALL INDIA
All India Thermal PLF
Apr-2018 Apr-2019
2012-13 2013-14 2014-15 2015-16 2016-17 2017-18
TampD Losses 2304 2284 2277 2181 2142 2104
ATampC Losses 2548 2262 2572 2398 NA NA
Provisional
Note As per PFC for utilities selling directly to consumers NA- Not Available
Total Number of Villages
597464
Note From the year 2004-05 onwards Definition of Village Electrification-
A village would be declared Electrified if
Without
Subsidy
Gap ACS-
ARR(
Without
Subsidy)
Paiseunit
Gap ACS-
ARR (on
subsidy
booked
basis)
paiseunit
Gap ACS-
ARR (on
subsidyrece
ived basis)
paiseunit
2013-14 400 118 76 77
2014-15 412 108 58 60
Source- PFC Reports on the performance of State Power Utilities
2013-14 4894
2014-15 5304
2015-16 5459
2016-17 5743
2017-18 6080
2018-19 6289
11
11 T amp D and ATampC Losses ()
12 All India Village Electrification
Villiages Electrified (Nos)
10000All villages as per census 2011 has
been electrified on 28042018
Villages electrified
Average cost of supply(ACS)
(paiseunit)
i) Basic Infrastructure such as Distribution Transformer and Distribution lines are provided in the inhabited locality
as well as Dalit Basti hemlet where it exists (For electrification through Non-Conventional Energy Sources a
Distribution Transformer may not be necessary)
14 All India Coal consumption for Power Generation (MT)
520
Average Revenue Realization(paiseunit)
518
Year
ii) Electricity is provided to Public places like Schools Panchayat Office Health Centre Dispensaries Community
Centres etc and
iv) Mandatory Certification from Gram Panchayat regarding the completion of village electrification should be
obtained
13 Average cost of Power amp Average Realisation
iii) The number of households electrified should be at least 10 of the total number of households in the village
SN Contents Page
1 Capacity Addition Targets and Achievements in 12th Plan amp upto March2019 12
2 Capacity Addition Targets amp Achievements during Apr-2019 and Apr-19 to Apr-19 13
3 Installed Capacity in various Regions including their shares 14-19
Section B - Capacity Addition
(i) CAPACITY ADDTION TARGETS AND ACHIEVEMENTS IN THE 12TH PLAN Figures in MW
TARGET ACH TARGET ACH TARGET ACH TARGET ACH
CENTRAL 14878 15869 6004 2584 5300 2000 26182 20453
STATE 13922 22201 1608 2276 0 0 15530 24477
PRIVATE 43540 53661 3285 619 0 0 46825 54280
ALL INDIA 72340 91730 10897 5479 5300 2000 88537 99209
(ii) CAPACITY ADDITION TARGET AND ACHIEVEMENT FOR 2017-18 (IN MW)
THERMAL HYDRO NUCLEAR
TARGET ACH TARGET ACH TARGET ACH TARGET ACH
CENTRAL 4880 3170 800 390 500 6180 3560
STATE 3546 1760 300 200 0 3846 1960
PRIVATE 2940 3780 205 205 0 3145 3985
ALL INDIA 11366 8710 1305 795 500 0 13171 9505
(iii) CAPACITY ADDITION ACHIEVEMENT FOR 2018-19 (IN MW)
TARGET ACH TARGET ACH TARGET ACH TARGET ACH
CENTRAL 2760 1960 710 110 0 0 3470 2070
STATE 4506 2850 130 30 0 0 4636 2880
PRIVATE 0 972 0 0 0 0 0 972
ALL INDIA 7266 5782 840 140 0 0 8106 5922
12
SECTOR
SECTOR
TOTAL
TOTALNUCLEARHYDROTHERMAL
1 Capacity Addtion Targets and Achievements in the 12th Plan amp upto March2019
SECTORTHERMAL HYDRO NUCLEAR TOTAL
(MW)
Cummulative
Deviation
Target Achievement Target Achievement (+) (-)
Central 6040 500 0 500 0 -500
State 425615 660 0 660 0 -660
Private 0 0 0 0 0 0
Total 1029615 1160 0 1160 0 -1160
Central 600 0 0 0 0 0
State 21099 0 0 0 0 0
Private 379 0 0 0 0 0
Total 118999 0 0 0 0 0
Nuclear Central 700 0 0 0 0 0
Central 7340 500 0 500 0 -500
State 446714 660 0 660 0 -660
Private 379 0 0 0 0 0
Total 1218614 1160 0 1160 0 -1160
Electricity Generation (MU) Targets and Achievements for 2016-17
13
Hydro
All India
Capacity Addition TargetsAchievements during the Month of Apr-2019
Thermal
2 Capacity Addition Targets Achievements During Apr-2019
Schemes Sector
Target 2019-20
Apr-19 to Apr-19Apr-19
11
60
0 0
11
60
0 0 0 0
0
200
400
600
800
1000
1200
1400
Thermal Hydro Nuclear Total
MW
Targets and Achievement during 2019-20Target Achievement
0
200
400
600
800
1000
1200
Thermal Hydro Nuclear Total
1160
0 0
1160
0 0 00
MW
Target Achievement
Coal Lignite Gas Diesel Total
State 1634400 25000 287920 000 1947320 000 869755 69956 2887031
Private 2168083 108000 55800 000 2331883 000 251400 1312046 3895329
Central 1233537 25000 234406 000 1492943 162000 849622 37900 2542465
Sub Total 5036020 158000 578126 000 5772146 162000 1970777 1419902 9324825
State 2156000 104000 284982 000 2544982 000 544650 54789 3144421
Private 3474567 50000 467600 000 3992167 000 48100 2186476 6226743
Central 1650295 000 328067 000 1978362 184000 162000 66630 2390992
Sub Total 7280862 154000 1080649 000 8515511 184000 754750 2307894 11762155
State 1993250 000 79198 28788 2101236 000 1177483 58688 3337407
Private 1187450 25000 532210 27370 1772030 000 000 3749140 5521170
Central 1123502 289000 35958 000 1448460 332000 000 54190 1834650
Sub Total 4304202 314000 647366 56158 5321726 332000 1177483 3862018 10693227
State 624000 000 10000 000 634000 000 353792 27511 1015303
Private 638700 000 000 000 638700 000 39900 111637 790237
Central 1483664 000 000 000 1483664 000 100520 1000 1585184
Sub Total 2746364 000 10000 000 2756364 000 494212 140148 3390724
State 000 000 49771 3600 53371 000 42200 23325 118895
Private 000 000 2450 000 2450 000 000 6104 8554
Central 77002 000 125360 000 202362 000 100500 3000 305862
Sub Total 77002 000 177581 3600 258183 000 142700 32429 433311
State 000 000 000 4005 4005 000 000 525 4530
Private 000 000 000 000 000 000 000 738 738
Central 000 000 000 000 000 000 000 510 510
Sub Total 000 000 000 4005 4005 000 000 1773 5778
State 6407650 129000 711871 36393 7284913 000 2987880 234793 10507586
Private 7468800 183000 1058060 27370 8737230 000 339400 7366140 16442770
Central 5568000 314000 723791 000 6605791 678000 1212642 163230 8659663
Total 19444450 626000 2493722 63763 22627934 678000 4539922 7764163 35610019
Figures at decimal may not tally due to rounding off
Note -
(As per latest information available with MNRE)
Break up of RES all India as on 31032019 is given below (in MW)
459315 3562597 2818071 7764163
A 0 MW
B Apr 2019 0 MW
C
Apr 2019 0 MW
D Net Capacity Added during Apr 2019 A-B-C 0 MW
Sector wise breakup of RES capacity as shown is provisional
Share of installed capacity of BBMB Stations is included in state sector of partner states
BM PowerCogen Waste to Energy
910350 13830
Capacity Added during Apr 2019
Capacity Retired during
Capacity removed due to change
from Conventional to RES during
Islands
ALL INDIA
Abbreviation- SHP=Small Hydro Project (le 25 MW) BP=Biomass Power UampI=Urban amp Industrial Waste Power RES=Renewable Energy Sources
1 RES include SHP BP UampI Solar and Wind Energy Installed capacity in respect of RES (MNRE) as on 31032019
Small
Hydro PowerWind Power
Bio-PowerSolar Power
Total
Capacity
RES
(MNRE)
Northern Region
Western Region
Southern Region
Eastern Region
North Eastern
Region
ALL INDIA INSTALLED CAPACITY (IN MW) OF POWER STATIONS
(As on 30042019)
(UTILITIES)
Region Ownership Sector
Mode wise breakup
Grand TotalThermalNuclear Hydro
Coal Lignite Gas Diesel Total
State 13500 000 180040 000 193540 000 000 000 193540
Private 86922 000 10800 000 97722 000 000 17889 115611
Central 311272 000 20701 000 331973 10283 72309 000 414565
Sub-Total 411694 000 211541 000 623235 10283 72309 17889 723716
State 272000 000 15000 000 287000 000 110282 6930 404212
Private 408078 000 000 000 408078 000 20000 34512 462590
Central 129472 000 53561 000 183034 10094 66370181 500 259998
Sub-Total 809550 000 68561 000 878112 10094 196652 41942 1126799
State 000 000 000 000 000 000 69460 25661 95121
Private 000 000 000 000 000 000 99200 62668 161868
Central 18340 000 6201 000 24541 2895 122388 000 149824
Sub-Total 18340 000 6201 000 24541 2895 291048 88329 406813
State 000 000 17500 000 17500 000 123000 12903 153403
Private 000 000 000 000 000 000 000 6483 6483
Central 50639 000 12907 000 63547 6798 109188 000 179533
Sub-Total 50639 000 30407 000 81047 6798 232188 19386 339419
State 176000 000 15000 000 191000 000 259770 12780 463550
Private 511550 000 000 000 511550 000 28800 115462 655812
Central 85458 000 26401 000 111859 19681 92342 000 223882
Sub-Total 773008 000 41401 000 814409 19681 380912 128242 1343244
State 626000 25000 60380 000 711380 000 109618 2385 823383
Private 280200 108000 000 000 388200 000 10400 730181 1128781
Central 95625 25000 22110 000 142735 55674 73901 34400 306710
Sub-Total 1001825 158000 82490 000 1242315 55674 193919 766966 2258874
State 546900 000 000 000 546900 000 72410 2510 621820
Private 871433 000 000 000 871433 000 84200 288760 1244393
Central 379639 000 54949 000 434588 28948 180253 3000 646789
Sub-Total 1797972 000 54949 000 1852921 28948 336863 294270 2513002
State 000 000 000 000 000 000 125215 6787 132002
Private 9900 000 45000 000 54900 000 8800 52620 116320
Central 34324 000 6966 000 41290 3124 47554 000 91968
Sub-Total 44224 000 51966 000 96190 3124 181569 59407 340290
State 000 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 000 3471 3471
Central 3815 000 1503 000 5317 801 10171 000 16289
Sub-Total 3815 000 1503 000 5317 801 10171 3471 19760
124953 000 29105 000 154058 23703 75145 000 252907
State 1634400 25000 287920 000 1947320 000 869755 69956 2887031
Private 2168083 108000 55800 000 2331883 000 251400 1312046 3895329
Central 1233537 25000 234406 000 1492943 162000 849622 37900 2542465
Grand Total 5036020 158000 578126 000 5772146 162000 1970777 1419902 9324825
Delhi
Haryana
Himachal Pradesh
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
NORTHERN REGION
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
(As on 30042019)
State Ownership Sector
Mode wise breakup
Grand TotalThermalNuclear Hydro
RES
(MNRE)
Jammu amp Kashmir
Punjab
Rajasthan
Uttar Pradesh
Uttarakhand
Chandigarh
Central - Unallocated
Total (Northern
Region)
(As on 30042019)
Coal Lignite Gas Diesel Total
State 000 000 000 000 000 000 000 005 005
Private 000 000 4800 000 4800 000 000 392 5192
Central 46959 000 1967 000 48926 2600 000 000 51526
Sub-Total 46959 000 6767 000 53726 2600 000 397 56723
State 000 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 000 1447 1447
Central 14141 000 4334 000 18475 700 000 000 19175
Sub-Total 14141 000 4334 000 18475 700 000 1447 20622
State 371000 104000 217782 000 692782 000 77200 6470 776452
Private 726567 50000 396000 000 1172567 000 000 833180 2005747
Central 324243 000 42400 000 366643 55900 000 24330 446873
Sub-Total 1421810 154000 656182 000 2231992 55900 77200 863980 3229072
State 540000 000 000 000 540000 000 170366 8396 718762
Private 617400 000 10000 000 627400 000 000 418040 1045440
Central 334238 000 25700 000 359938 27300 152000 30000 569238
Sub-Total 1491638 000 35700 000 1527338 27300 322366 456436 2333440
State 228000 000 000 000 228000 000 12000 1105 241105
Private 885000 000 000 000 885000 000 000 52430 937430
Central 211075 000 000 000 211075 4800 10000 000 225875
Sub-Total 1324075 000 000 000 1324075 4800 22000 53535 1404410
State 1017000 000 67200 000 1084200 000 285084 38813 1408097
Private 1245600 000 56800 000 1302400 000 48100 880441 2230941
Central 466780 000 227273 000 694053 69000 000 12300 775353
Sub-Total 2729380 000 351273 000 3080653 69000 333184 931553 4414390
State 000 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 000 546 546
Central 19560 000 6634 000 26194 900 000 000 27094
Sub-Total 19560 000 6634 000 26194 900 000 546 27640
233300 000 19759 000 253059 22800 000 000 275859
State 2156000 104000 284982 000 2544982 000 544650 54789 3144421
Private 3474567 50000 467600 000 3992167 000 48100 2186476 6226743
Central 1650295 000 328067 000 1978362 184000 162000 66630 2390992
Grand Total 7280862 154000 1080649 000 8515511 184000 754750 2307894 11762155
Goa
Daman amp Diu
Gujarat
Madhya Pradesh
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
WESTERN REGION
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
ThermalNuclear Hydro
RES
(MNRE)
State Ownership Sector
Mode wise breakup
Grand Total
Chhattisgarh
Maharashtra
Dadra amp Nagar
Naveli
Central - Unallocated
Total (Western
Region)
(As on 30042019)
Coal Lignite Gas Diesel Total
State 501000 000 23540 000 524540 000 167360 5618 697518
Private 387388 000 381318 3680 772386 000 000 743342 1515728
Central 154683 12773 000 000 167456 12727 000 25000 205183
Sub-Total 1043071 12773 404858 3680 1464382 12727 167360 773960 2418429
State 558250 000 000 000 558250 000 247993 4122 810365
Private 83945 000 83182 000 167127 000 000 393644 560771
Central 180685 14927 000 000 195612 14873 000 1000 211485
Sub-Total 822880 14927 83182 000 920989 14873 247993 398766 1582621
State 502000 000 000 12792 514792 000 358660 19389 892841
Private 195850 000 000 2520 198370 000 000 1363591 1561961
Central 242780 40140 000 000 282920 69800 000 000 352720
Sub-Total 940630 40140 000 15312 996082 69800 358660 1382979 2807521
State 000 000 000 15996 15996 000 185650 17290 218936
Private 61500 000 17400 000 78900 000 000 19021 97921
Central 86142 28180 35958 000 150280 36200 000 5000 191480
Sub-Total 147642 28180 53358 15996 245176 36200 185650 41311 508337
State 432000 000 52408 000 484408 000 217820 12270 714498
Private 458767 25000 50310 21170 555247 000 000 1229228 1784475
Central 302532 136420 000 000 438952 144800 000 23190 606942
Sub-Total 1193299 161420 102718 21170 1478607 144800 217820 1264688 3105915
State 000 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 000 000 000
Central 000 10000 000 000 10000 000 000 000 10000
Sub-Total 000 10000 000 000 10000 000 000 000 10000
State 000 000 3250 000 3250 000 000 000 3250
Private 000 000 000 000 000 000 000 314 314
Central 14080 10760 000 000 24840 8600 000 000 33440
Sub-Total 14080 10760 3250 000 28090 8600 000 314 37004
142600 35800 000 000 178400 45000 000 000 223400
State 1993250 000 79198 28788 2101236 000 1177483 58688 3337407
Private 1187450 25000 532210 27370 1772030 000 000 3749140 5521170
Central 1123502 289000 35958 000 1448460 332000 000 54190 1834650
Grand Total 4304202 314000 647366 56158 5321726 332000 1177483 3862018 10693227
Kerala
Andhra Pradesh
Telangana
Karnataka
Total (Southern
Region)
Tamil Nadu
NLC
Puducherry
Central - Unallocated
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
SOUTHERN REGION
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
State Ownership Sector
Mode wise breakup
Grand TotalThermalNuclear Hydro
RES
(MNRE)
(As on 30042019)
Coal Lignite Gas Diesel Total
State 000 000 000 000 000 000 000 7070 7070
Private 28100 000 000 000 28100 000 000 25545 53645
Central 384933 000 000 000 384933 000 11000 000 395932
Sub-Total 413033 000 000 000 413033 000 11000 32615 456647
State 42000 000 000 000 42000 000 13000 405 55405
Private 73000 000 000 000 73000 000 000 3495 76495
Central 39374 000 000 000 39374 000 6100 000 45474
Sub-Total 154374 000 000 000 154374 000 19100 3900 177374
State 540000 000 10000 000 550000 000 98600 12195 660795
Private 243700 000 000 000 243700 000 000 35250 278950
Central 76077 000 000 000 76077 000 41000 000 117077
Sub-Total 859777 000 10000 000 869777 000 139600 47445 1056822
State 000 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 000 000 000
Central 698504 000 000 000 698504 000 18620 000 717124
Sub-Total 698504 000 000 000 698504 000 18620 000 717124
State 42000 000 000 000 42000 000 206192 2630 250822
Private 293900 000 000 000 293900 000 000 47346 341246
Central 163390 000 000 000 163390 000 8900 1000 173290
Sub-Total 499290 000 000 000 499290 000 215092 50976 765358
State 000 000 000 000 000 000 36000 5211 41211
Private 000 000 000 000 000 000 39900 001 39901
Central 8703 000 000 000 8703 000 6400 000 15103
Sub-Total 8703 000 000 000 8703 000 82300 5212 96215
112683 000 000 000 112683 000 8501 000 121184
State 624000 000 10000 000 634000 000 353792 27511 1015303
Private 638700 000 000 000 638700 000 39900 111637 790237
Central 1483664 000 000 000 1483664 000 100520 1000 1585184
Grand Total 2746364 000 10000 000 2756364 000 494212 140148 3390724
Total (Eastern
Region)
Bihar
Jharkhand
West Bengal
DVC
Odisha
Sikkim
Central - Unallocated
HydroOwnership Sector
Mode wise breakup
Grand TotalThermalNuclear
RES
(MNRE)
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
State
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
EASTERN REGION
(As on 30042019)
Coal Lignite Gas Diesel Total
State 000 000 32821 000 32821 000 10000 501 43322
Private 000 000 2450 000 2450 000 000 2650 5100
Central 40852 000 43556 000 84408 000 35708 2500 122616
Sub-Total 40852 000 78827 000 119679 000 45708 5651 171038
State 000 000 000 000 000 000 000 10711 10711
Private 000 000 000 000 000 000 000 2939 2939
Central 3705 000 4682 000 8387 000 11655 000 20042
Sub-Total 3705 000 4682 000 8387 000 11655 13650 33692
State 000 000 000 000 000 000 32200 3253 35453
Private 000 000 000 000 000 000 000 012 012
Central 4560 000 10969 000 15529 000 7227 000 22756
Sub-Total 4560 000 10969 000 15529 000 39427 3265 58221
State 000 000 16950 000 16950 000 000 1601 18551
Private 000 000 000 000 000 000 000 009 009
Central 5610 000 43695 000 49305 000 6849 500 56654
Sub-Total 5610 000 60645 000 66255 000 6849 2110 75214
State 000 000 000 3600 3600 000 000 545 4145
Private 000 000 000 000 000 000 000 344 344
Central 4710 000 7157 000 11867 000 9534 000 21401
Sub-Total 4710 000 7157 3600 15467 000 9534 889 25890
State 000 000 000 000 000 000 000 3067 3067
Private 000 000 000 000 000 000 000 100 100
Central 3210 000 4893 000 8103 000 5733 000 13836
Sub-Total 3210 000 4893 000 8103 000 5733 3167 17003
State 000 000 000 000 000 000 000 3647 3647
Private 000 000 000 000 000 000 000 050 050
Central 3105 000 4046 000 7151 000 9794 000 16945
Sub-Total 3105 000 4046 000 7151 000 9794 3697 20642
11250 000 6362 000 17612 000 14000 000 31612
State 000 000 49771 3600 53371 000 42200 23325 118895
Private 000 000 2450 000 2450 000 000 6104 8554
Central 77002 000 125360 000 202362 000 100500 3000 305862
Grand Total 77002 000 177581 3600 258183 000 142700 32429 433311
Assam
Arunachal Pradesh
Meghalaya
Tripura
Manipur
Nagaland
Mizoram
Central - Unallocated
Total (North-
Eastern Region)
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
NORTH-EASTERN REGION
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
State Ownership Sector
Mode wise breakup
Grand TotalThermalNuclear Hydro
RES
(MNRE)
(As on 30042019)
Coal Lignite Gas Diesel Total
State 000 000 000 4005 4005 000 000 525 4530
Private 000 000 000 000 000 000 000 663 663
Central 000 000 000 000 000 000 000 510 510
Sub-Total 000 000 000 4005 4005 000 000 1698 5703
State 000 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 000 075 075
Central 000 000 000 000 000 000 000 000 000
Sub-Total 000 000 000 000 000 000 000 075 075
State 000 000 000 4005 4005 000 000 525 4530
Private 000 000 000 000 000 000 000 738 738
Central 000 000 000 000 000 000 000 510 510
Grand Total 000 000 000 4005 4005 000 000 1773 5778
Andaman amp
Nicobar
Lakshadweep
Total (Islands)
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
ISLANDS
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
State Ownership Sector
Mode wise breakup
Grand TotalThermalNuclear Hydro
RES
(MNRE)
SrNo Contents Page
1 Executive summary of Target and Achievement of Transmission Lines during 2019-20
20(1)
2 List of Transmission Lines CommissionedReady for commissioning during Apr-2019 20(2)
Section C - Transmission Lines
1 Executive summary of Target and Achievement of Transmission Lines during 2019-20 As on 30-04-19
(All figures in circuit kms)
Ce
ntr
al S
ecto
r
Sta
te S
ecto
r
JV
Pri
va
te S
ecto
r
To
tal
Ce
ntr
al S
ecto
r
Sta
te S
ecto
r
JV
Pri
va
te S
ecto
r
To
tal
Ce
ntr
al S
ecto
r
Sta
te S
ecto
r
JV
Pri
va
te S
ecto
r
To
tal
Ce
ntr
al S
ecto
r
Sta
te S
ecto
r
JV
Pri
va
te S
ecto
r
To
tal
Ce
ntr
al S
ecto
r
Sta
te S
ecto
r
JV
Pri
va
te S
ecto
r
To
tal
Ce
ntr
al
Se
cto
r
Sta
te S
ec
tor
JV
Pri
va
te S
ec
tor
Gra
nd
To
tal
0 0 0 0 0 0 0 0 2727 958 2334 6019 2239 3416 1143 6798 781 10023 0 10804 5747 14397 3477 23621
Apr19 Programme 0 0 0 0 0 0 0 0 577 416 557 1550 60 890 203 1153 0 309 0 309 637 1615 760 3012
Achievement 0 0 0 0 0 0 0 0 53 0 0 53 0 20 0 20 0 401 0 401 53 421 0 474
Upto Apr-19 Programme 0 0 0 0 0 0 0 0 577 416 557 1550 60 890 203 1153 0 309 0 309 637 1615 760 3012
Achievement 0 0 0 0 0 0 0 0 53 0 0 53 0 20 0 20 0 401 0 401 53 421 0 474
20(1)
220 kV Grand Total 800 kV 500 kV
Programme 2019-20
Programme
Achievement
HVDC765 kV 400 kV
Line
1 2 3 4 5 6
1 400 Bhadla (PG) - Bhadla (RVPN) line DC PGCIL 53
53
2 400 LILO of one ckt Jhanor - Navsari at Vav Ss DC GETCO 20
3 220 Banda-Chitrakoot Line DC UPPTCL 226
4 220 Gorakhpur (PG)-Gola line DC UPPTCL 82
5 220 Hapur(765) - Faridnagar line SC UPPTCL 11
6 220 Kalikiri - Madanapalli line DC APTRANSCO 60
7 220LILO of Gr Noida -Noida Sec-129 at Noida
Sec-148DC UPPTCL 1
8 220LILO of one Ckt of Badshahpur Pali at Sec-
65 GurgaonDC HVPNL 3
9 220 Sultanpur-Sangipur LILO Section at Amethi DC UPPTCL 18
421
0
474
20(2)
Grand Total
2Transmission Lines (220 kV and above) CommissionedReady for commissioning During Apr-2019
Voltage
Level (kV)Name of Transmission Lines
Circuit
Type
Executing
Agency
CENTRAL SECTOR
Total of CENTRAL SECTOR
STATE SECTOR Sector
Total of STATE SECTOR
PRIVATE SECTOR
Total of PRIVATE SECTOR
SlNo
Length(CKm)
As on 30-04-19
SN Contents Page
1 Executive summary of Target and Achievement of Substations during 2019-20 21(1)
2Sub Stations (220 kV and above) commissionedready for commisssioning during Apr-
201921(2)
Section D - Sub Stations
1 Executive summary of Target and Achievement of Substations during 2019-2020 As on 30-04-19
(All figures in circuit MVA)
Ce
ntr
al S
ecto
r
Sta
te S
ecto
r
JV
Pri
va
te S
ecto
r
To
tal
Ce
ntr
al S
ecto
r
Sta
te S
ecto
r
JV
Pri
va
te S
ecto
r
To
tal
Ce
ntr
al S
ecto
r
Sta
te S
ecto
r
JV
Pri
va
te S
ecto
r
To
tal
Ce
ntr
al S
ecto
r
Sta
te S
ecto
r
JV
Pri
va
te S
ecto
r
To
tal
Ce
ntr
al S
ecto
r
Sta
te S
ecto
r
JV
Pri
va
te S
ecto
r
To
tal
Ce
ntr
al S
ec
tor
Sta
te S
ec
tor
JV
Pri
va
te S
ec
tor
Gra
nd
To
tal
3000 0 0 3000 0 0 0 0 18000 3000 6000 27000 5205 19665 4260 29130 800 21786 0 22586 27005 44451 10260 81716
Apr19 Programme 0 0 0 0 0 0 0 0 3000 0 3000 6000 0 1000 2000 3000 0 800 0 800 3000 1800 5000 9800
Achievement 0 0 0 0 0 0 0 0 500 0 0 500 815 1980 0 2795 0 1305 0 1305 1315 3285 0 4600
Upto Apr-19 Programme 0 0 0 0 0 0 0 0 3000 0 3000 6000 0 1000 2000 3000 0 800 0 800 3000 1800 5000 9800
Achievement 0 0 0 0 0 0 0 0 500 0 0 500 815 1980 0 2795 0 1305 0 1305 1315 3285 0 4600
21(1)
220 kV Grand Total 800 kV 500 kV
Programme 2019-20
Programme
Achievement
HVDC765 kV 400 kV
As on 30-04-19
Sl Voltage Ratio Capacity
No (kVkV) (MWMVA)
1 2 3 4 5
1 Bhadla SS (3x1500 3x500 MVA) 765400 PGCIL 500
2 Extn at Tumkur (Pavagada ) PS (2x500 MVA) 400220 PGCIL 500
3 Bongaigaon (2nd ICT) Ss 400220 PGCIL 315
Total of CENTRAL SECTOR 1315
4 Motiram Adda Gorakhpur (Aug) (Additional TF) 400220 UPPTCL 240
5 Muradnagar-II Ghaziabad (Aug) (Additional TF) 400220 UPPTCL 240
6 Noida Sec- 148 GBNagar (New) 400220 UPPTCL 5007 Sarnath Varanasi (Aug) TF- II (500-315) 400220 UPPTCL 1858 Sarojininagar Lucknow Aug) TF- II (500-315) 400220 UPPTCL 185
9 Unnao (Aug) TF-III 400220 UPPTCL 31510 Nawada SS 400220 HVPNL 31511 Kharepatan SS 22033 MSETCL 2512 Prathipadu SS 220132 APTRANSCO 10013 Pali Ss 22066 HVPNL 160
14 A-5 Faridabad Ss 22066 HVPNL 60
15 Rentachintala Ss Aug(3X100-2x100) 220132 APTRANSCO 10016 Amethi Ss 220132 UPPTCL 160
17 Gajokhar Varanasi (Aug) TF- II (160-100) 220132 UPPTCL 60
18 Gola Gorakhpur (New) 220132 UPPTCL 160
19 Khurja Bulandshahr (Aug) TF- II (200-160) 220132 UPPTCL 40
20 RC Green GB Nagar (Aug) TF-II (160-100) 220132 UPPTCL 60
21 Sikandrabad Bulandshahr (Aug) (Additional TF) 220132 UPPTCL 160
22 Sitapur (Aug) (Additional TF) 220132 UPPTCL 160
23 Sohawal Ayodhya (Aug) TF-II (160-100) 220132 UPPTCL 60
TOTAL STATE SECTOR 3285
GRAND TOTAL 4600
21(2)
CENTRAL SECTOR
STATE SECTOR
2Sub-Stations (220 kV and above) CommissionedReady for commissioning During Apr-2019
Name of Sub Stations Executing Agency
SN Contents Page
1 Electricity Generation (MU) Targets and Achievements for 2019-20 22
Section E - Electricity Generation
Programme Achievement Ach Programme Achievement Ach
Central Sector 37545100 3177900 3129530 9848 3177900 3129530 9848
State Sector 37498600 3322500 2950558 8881 3322500 2950558 8881
PvtIPP Sector 37346200 3236400 3195940 9875 3236400 3195940 9875
PvtUTL Sector 1823100 159300 165579 10394 159300 165579 10394
Total 114213000 9896100 9441607 9541 9896100 9441607 9541
Central Sector 5661700 386100 481390 12468 386100 481390 12468
State Sector 6680500 498200 536514 10769 498200 536514 10769
PvtIPP Sector 1206900 57300 80405 14032 57300 80405 14032
PvtUTL Sector 144100 12300 10930 8886 12300 10930 8886
Total 13693200 953900 1109239 11628 953900 1109239 11628
Central Sector 4472000 367300 317765 8651 367300 317765 8651
Total 4472000 367300 317765 8651 367300 317765 8651
Bhutan Import 621800 17500 24396 13941 17500 24396 13941
Central Sector 47678800 3931300 3928685 9993 3931300 3928685 9993
State Sector 44179100 3820700 3487072 9127 3820700 3487072 9127
Pvt Sector 40520300 3465300 3452854 9964 3465300 3452854 9964
Total 133000000 11234800 10893007 9696 11234800 10893007 9696
Provisional based on actual-cum-Assesment
Figs in MU
Cummulative
Achievement
Cummulative
Achievement
Mar-19 Mar-18 Upto Mar-2019 Upto Mar-2018
984785 869291 12675910 10183949
22
1 Electricity Generation (MU) Targets and Achievememts for 2019-20
All India Energy Generation During Apr-19 to Apr-19 (MU)
Target (2019-20)Apr-19 to Apr-19
Sector
Hydro
Thermal
Nuclear
Renewable Energy Generation
Achievement
Apr-2019
98961
95393673
112348
94416
11092
3178
108930
0
20000
40000
60000
80000
100000
120000
Thermal Hydro Nuclear Total
Programme
Achievement
SN Contents Page
1 Energy Power Supply Position (Provisional) for Apr-2019 and during Apr-19 to Apr-19 23
2 Peak Power Supply Position (Provisional) for Apr-2019 and during Apr-19 to Apr-19 24
3 Energy Power Supply Position (Revised) for Mar-2019 and during Apr-19 to Mar-19 25
4 Peak Power Supply Position (Revised) for Mar-2019 and during Apr-19 to Mar-19 26
5 Notified Power cuts Restrictions on Industries during Apr-2019 27
6 Power Supply to Agricultural Sector during Apr-2019 28
Section F - Power supply position
आकड़ मममलयन यननट नट Figures in MU net
ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied
कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )
चडीगढ़ Chandigarh 117 117 0 00 117 117 0 00
दिलली Delhi 2698 2698 1 00 2698 2698 1 00
हरियजणज Haryana 3773 3773 0 00 3773 3773 0 00
दहमजचल परिश Himachal Pradesh 777 777 0 00 777 777 0 00
रमम कशमीि Jammu amp Kashmir 1604 1296 308 192 1604 1296 308 192
परजब Punjab 3646 3646 0 00 3646 3646 0 00
िजरसथजन Rajasthan 6210 6208 2 00 6210 6208 2 00
उतति परिश Uttar Pradesh 10179 10148 32 03 10179 10148 32 03
उततिजखड Uttarakhand 1120 1120 0 00 1120 1120 0 00
उततरी कषतर Northern Region 30094 29786 308 10 30094 29786 308 10
छततीसगढ़ Chhattisgarh 2684 2676 8 03 2684 2676 8 03
गरिजत Gujarat 10718 10718 0 00 10718 10718 0 00
मधय परिश Madhya Pradesh 6006 6006 0 00 6006 6006 0 00
महजिजषटर Maharashtra 14308 14308 0 00 14308 14308 0 00
िमन औि दिउ Daman amp Diu 220 220 0 00 220 220 0 00
िजिि व नगि हवली Dadra amp Nagar Haveli 552 552 0 00 552 552 0 00
गोवज Goa 388 388 0 00 388 388 0 00
पशचिमी कषतर Western Region 34875 34868 8 00 34875 34868 8 00
आनधर परिश Andhra Pradesh 5708 5708 0 00 5708 5708 0 00
तलगजनज Telangana 5725 5725 0 00 5725 5725 0 00
कनजाटक Karnataka 7003 7003 0 00 7003 7003 0 00
किल Kerala 2402 2400 2 01 2402 2400 2 01
तममल नजड Tamil Nadu 10010 10010 0 00 10010 10010 0 00
पडचिी Puducherry 263 263 0 00 263 263 0 00
लकष-दवीप Lakshadweep 4 4 0 0 4 4 0 0
दकषकषणी कषतर Southern Region 31111 31109 2 00 31111 31109 2 00
बबहजि Bihar 2589 2589 0 00 2589 2589 0 00
िजमोिि घजटी ननगम DVC 1772 1772 0 00 1772 1772 0 00
झजिखणड Jharkhand 689 689 0 00 689 689 0 00
ओडडशज Odisha 2689 2689 1 00 2689 2689 1 00
पशशचम बगजल West Bengal 5075 5075 0 00 5075 5075 0 00
मसशककम Sikkim 37 37 0 00 37 37 0 00
अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 7 29 27 2 7
परवी कषतर Eastern Region 12851 12850 1 00 12851 12850 1 00
अरणजचल परिश Arunachal Pradesh 66 66 0 05 66 66 0 05
असम Assam 766 709 57 75 766 709 57 75
मणणपि Manipur 68 67 1 15 68 67 1 15
मघजलय Meghalaya 170 160 10 59 170 160 10 59
ममज़ोिम Mizoram 54 53 0 08 54 53 0 08
नजगजलड Nagaland 54 54 0 08 54 54 0 08
बिपिज Tripura 122 120 1 12 122 120 1 12
उततर-परवी कषतर North-Eastern Region 1300 1228 71 55 1300 1228 71 55
समपणण भारत All India 110231 109842 389 04 110231 109842 389 04
23
ऊरजा पनत ा म कमी ऊरजा पनत ा म कमीEnergy not Supplied
Excludes energy exported to Bangladesh
Energy not Supplied
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
ऊराण वरवदयत आपरत ण शथिरत ररपोरण (परवाणरवलोकन) Energy Power Supply Position Report (Provisional)
राजयState
अपरल 2019 April2019 अपरल2019 -अपरल2019 April2019 to April2019
अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met
कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )
चडीगढ़ Chandigarh 256 256 0 00 256 256 0 00
दिलली Delhi 5664 5664 0 00 5664 5664 0 00
हरियजणज Haryana 8127 8127 0 00 8127 8127 0 00
दहमजचल परिश Himachal Pradesh 1387 1387 0 00 1387 1387 0 00
रमम कशमीि Jammu amp Kashmir 2826 2261 565 200 2826 2261 565 200
परजब Punjab 7015 7015 0 00 7015 7015 0 00
िजरसथजन Rajasthan 10560 10560 0 00 10560 10560 0 00
उतति परिश Uttar Pradesh 19935 19935 0 00 19935 19935 0 00
उततिजखड Uttarakhand 1922 1922 0 00 1922 1922 0 00
उततरी कषतर Northern Region 54476 53985 491 09 54476 53985 491 09
छततीसगढ़ Chhattisgarh 4596 4574 22 05 4596 4574 22 05
गरिजत Gujarat 17871 17865 6 00 17871 17865 6 00
मधय परिश Madhya Pradesh 10018 10018 0 00 10018 10018 0 00
महजिजषटर Maharashtra 23158 23150 8 00 23158 23150 8 00
िमन औि दिउ Daman amp Diu 341 340 1 02 341 340 1 02
िजिि व नगि हवली Dadra amp Nagar Haveli 818 818 0 00 818 818 0 00
गोवज Goa 594 594 0 00 594 594 0 00
पशचिमी कषतर Western Region 56242 56222 20 00 56242 56222 20 00
आनधर परिश Andhra Pradesh 9151 9151 0 00 9151 9151 0 00
तलगजनज Telangana 10191 10191 0 00 10191 10191 0 00
कनजाटक Karnataka 12681 12681 0 00 12681 12681 0 00
किल Kerala 4309 4300 8 02 4309 4300 8 02
तममल नजड Tamil Nadu 15972 15972 0 00 15972 15972 0 00
पडचिी Puducherry 482 480 2 05 482 480 2 05
लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0
दकषकषणी कषतर Southern Region 49155 49103 52 01 49155 49103 52 01
बबहजि Bihar 5357 5357 0 00 5357 5357 0 00
िजमोिि घजटी ननगम DVC 3039 3039 0 00 3039 3039 0 00
झजिखणड Jharkhand 1266 1266 0 00 1266 1266 0 00
ओडडशज Odisha 5389 5389 0 00 5389 5389 0 00
पशशचम बगजल West Bengal 8666 8666 0 00 8666 8666 0 00
मसशककम Sikkim 100 100 0 00 100 100 0 00
अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7
परवी कषतर Eastern Region 23349 23349 0 00 23349 23349 0 00
अरणजचल परिश Arunachal Pradesh 139 136 3 22 139 136 3 22
असम Assam 1712 1667 45 26 1712 1667 45 26
मणणपि Manipur 197 188 9 46 197 188 9 46
मघजलय Meghalaya 336 336 0 00 336 336 0 00
ममज़ोिम Mizoram 116 113 3 26 116 113 3 26
नजगजलड Nagaland 157 131 26 166 157 131 26 166
बिपिज Tripura 292 291 1 03 292 291 1 03
उततर-परवी कषतर North-Eastern Region 2848 2780 68 24 2848 2780 68 24
समपणण भारत All India 177411 176810 601 03 177411 176810 601 03
24
मजग की पनत ा म कमी Demand not Met
Excludes the supply to Bangladesh
राजयStateअपरल 2019 April2019
मजग की पनत ा म कमी Demand not Met
अधिकतम वरवदयत आपरत ण शथिरत ररपोरण (परवाणरवलोकन) Peak Power Supply Position Report (Provisional)
आकड़ मगज वजट नट Figures in MW netअपरल2019 -अपरल2019 April2019 to April2019
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
आकड़ मममलयन यननट नट Figures in MU net
ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied
कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )
चडीगढ़ Chandigarh 96 96 0 00 1561 1561 0 00
दिलली Delhi 1931 1930 1 00 32299 32282 17 01
हरियजणज Haryana 3658 3658 0 00 53665 53665 0 00
दहमजचल परिश Himachal Pradesh 832 830 2 02 9850 9618 232 24
रमम कशमीि Jammu amp Kashmir 1767 1414 353 200 19593 15868 3725 190
परजब Punjab 3585 3585 0 00 55288 55275 13 00
िजरसथजन Rajasthan 6774 6770 4 01 79826 79637 189 02
उतति परिश Uttar Pradesh 8754 8691 63 07 117101 116118 984 08
उततिजखड Uttarakhand 1067 1067 0 00 13845 13753 92 07
उततरी कषतर Northern Region 28464 28041 423 15 383028 377776 5251 14
छततीसगढ़ Chhattisgarh 2464 2457 8 03 26130 26076 54 02
गरिजत Gujarat 9890 9890 0 00 116588 116572 15 00
मधय परिश Madhya Pradesh 6236 6236 0 00 75667 75665 2 00
महजिजषटर Maharashtra 13631 13631 0 00 158285 158148 137 01
िमन औि दिउ Daman amp Diu 221 221 0 00 2557 2557 0 00
िजिि व नगि हवली Dadra amp Nagar Haveli 553 553 0 00 6317 6317 0 00
गोवज Goa 362 362 0 00 4283 4280 3 01
पशचिमी कषतर Western Region 33357 33349 8 00 389827 389615 212 01
आनधर परिश Andhra Pradesh 6072 6071 1 00 63735 63677 58 01
तलगजनज Telangana 6930 6929 1 00 66697 66635 62 01
कनजाटक Karnataka 7614 7612 1 00 71759 71690 69 01
किल Kerala 2489 2488 1 00 25029 24911 118 05
तममल नजड Tamil Nadu 10247 10245 2 00 109375 109273 102 01
पडचिी Puducherry 252 251 1 04 2761 2751 10 03
लकष-दवीप Lakshadweep 4 4 0 0 46 46 0 0
दकषकषणी कषतर Southern Region 33605 33597 8 00 339355 338938 417 01
बबहजि Bihar 2319 2318 1 00 30052 29827 225 07
िजमोिि घजटी ननगम DVC 1773 1772 1 00 22365 21995 369 17
झजिखणड Jharkhand 698 697 1 01 8682 8461 221 25
ओडडशज Odisha 2583 2582 1 00 31810 31781 30 01
पशशचम बगजल West Bengal 4585 4584 2 00 52237 52078 159 03
मसशककम Sikkim 41 41 0 00 513 512 0 01
अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 67 346 323 23 67
परवी कषतर Eastern Region 11999 11995 5 00 145658 144654 1004 07
अरणजचल परिश Arunachal Pradesh 61 60 0 06 864 855 9 10
असम Assam 680 656 23 34 9532 9204 328 34
मणणपि Manipur 68 68 1 09 916 906 10 11
मघजलय Meghalaya 173 173 0 03 1955 1953 1 01
ममज़ोिम Mizoram 50 49 0 09 668 661 8 12
नजगजलड Nagaland 58 57 1 20 902 809 93 103
बिपिज Tripura 150 150 0 00 1859 1837 21 11
उततर-परवी कषतर North-Eastern Region 1240 1214 26 21 16696 16225 471 28
समपणण भारत All India 108665 108196 469 04 1274564 1267209 7355 06
Note The revised data for March 2019 is not avaliable
Excludes energy exported to Bangladesh
राजयState
ऊराण वरवदयत आपरत ण शथिरत ररपोरण (परवाणरवलोकन) Energy Power Supply Position Report (Provisional)
25
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
Energy not Supplied Energy not Supplied
मािण2019 March2019 अपरल2018 -मािण2019 April2018 to March2019
ऊरजा पनत ा म कमी ऊरजा पनत ा म कमी
अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met
कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )
चडीगढ़ Chandigarh 223 223 0 00 369 369 0 00
दिलली Delhi 4016 4016 0 00 7016 7016 0 00
हरियजणज Haryana 6544 6544 0 00 10270 10270 0 00
दहमजचल परिश Himachal Pradesh 1683 1683 0 00 1700 1700 0 00
रमम कशमीि Jammu amp Kashmir 3277 2622 655 200 3277 2622 655 200
परजब Punjab 6564 6564 0 00 12638 12638 0 00
िजरसथजन Rajasthan 11885 11885 0 00 13276 13276 0 00
उतति परिश Uttar Pradesh 16220 16220 0 00 20498 20062 436 21
उततिजखड Uttarakhand 2002 2002 0 00 2216 2216 0 00
उततरी कषतर Northern Region 47925 47356 569 12 63166 61726 1440 23
छततीसगढ़ Chhattisgarh 4444 4128 316 71 4444 4270 174 39
गरिजत Gujarat 16263 16263 0 00 17053 16963 90 05
मधय परिश Madhya Pradesh 12328 12323 5 00 13815 13815 0 00
महजिजषटर Maharashtra 22361 22291 70 03 23864 23254 610 26
िमन औि दिउ Daman amp Diu 336 336 0 01 357 356 1 02
िजिि व नगि हवली Dadra amp Nagar Haveli 800 799 1 01 816 815 1 01
गोवज Goa 538 538 0 00 596 596 0 00
पशचिमी कषतर Western Region 53132 52965 167 03 56675 55821 853 15
आनधर परिश Andhra Pradesh 8977 8977 0 00 9459 9453 6 01
तलगजनज Telangana 10471 10471 0 00 10815 10815 0 00
कनजाटक Karnataka 12841 12841 0 00 12841 12841 0 00
किल Kerala 4264 4228 36 09 4264 4228 36 09
तममल नजड Tamil Nadu 15712 15712 0 00 15712 15712 0 00
पडचिी Puducherry 427 412 15 34 427 412 15 34
लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0
दकषकषणी कषतर Southern Region 49464 49464 0 00 49464 49464 0 00
बबहजि Bihar 4633 4633 0 00 5115 5084 31 06
िजमोिि घजटी ननगम DVC 3035 3035 0 00 3035 3035 0 00
झजिखणड Jharkhand 1210 1210 0 00 1339 1291 48 36
ओडडशज Odisha 4827 4827 0 00 5357 5357 0 00
पशशचम बगजल West Bengal 8287 8287 0 00 9130 9123 7 01
मसशककम Sikkim 100 100 0 00 106 106 0 00
अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7
परवी कषतर Eastern Region 21658 21658 0 00 23141 22733 408 18
अरणजचल परिश Arunachal Pradesh 133 131 2 15 138 138 0 01
असम Assam 1539 1508 31 20 1865 1809 56 30
मणणपि Manipur 204 199 5 25 219 216 3 12
मघजलय Meghalaya 357 357 0 00 374 372 1 04
ममज़ोिम Mizoram 108 105 3 28 121 119 2 17
नजगजलड Nagaland 127 125 2 16 156 138 18 116
बिपिज Tripura 249 249 0 00 298 293 5 17
उततर-परवी कषतर North-Eastern Region 2540 2535 5 02 2967 2850 117 39
समपणण भारत All India 169464 168745 719 04 177022 175528 1494 08
Note The revised data for March 2019 is not avaliable 26
अधिकतम वरवदयत आपरत ण शथिरत ररपोरण (परवाणरवलोकन) Peak Power Supply Position Report (Provisional)
आकड़ मगज वजट नट Figures in MW net
राजयStateमािण2019 March2019 अपरल2018 -मािण2019 April2018 to March2019
मजग की पनत ा म कमी मजग की पनत ा म कमी Demand not MetDemand not Met
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
Excludes the supply to Bangladesh
अपरल 2019 April2019 अपरल2018 -मािण2019 April2019 to April2019
उततरी कषतर Northern Region
चडीगढ़ Chandigarh(Data Not Received)दिलली Delhi
हरियजणज Haryana
दहमजचल परिश Himachal Pradeshरमम कशमीि Jammu amp Kashmir(Data
Not Received)परजब Punjab
िजरसथजन Rajasthanउतति परिश Uttar Pradesh
उततिजखड Uttarakhand
पशचिमी कषतर Western Region
छततीसगढ़ Chhattisgarh
Apr-Nov 2018- No cuts
Maximum Demand cut-58MW
Energy cut- 00020-00032 MUsday
गरिजत Gujarat
मधय परिश Madhya Pradesh
महजिजषटर Maharashtra
गोवज Goa
दकषकषणी कषतर Southern Region
आनधर परिश Andhra Pradesh
तलगजनज Telangana
कनजाटक Karnataka
किल Kerala
तममल नजड Tamil Nadu
पडचिी Puducherryपरवी कषतर Eastern Region
बबहजि Bihar
झजिखणड Jharkhand
ओडडशज Odisha
पशशचम बगजल West Bengal
No N
otifie
d Cu
ts
27
मािण 2019 म इडथरीर पर वरवदयत करौती का वरवरवरण Notified Power CutsRestrictions on Industries during April2019
राजय कषतर State Regionऊराणमाग करौती EnergyDemand Cut
No N
otifie
d Cu
tsNo
Notifie
d Cu
ts
अपरल2019 April 2019 अपरल2019 -अपरल2019 April2019 to April2019
उततरी कषतर Northern Region
चडीगढ़ Chandigarh Data not received Data not received
दिलली Delhi Data not received Data not received
हरियजणज Haryana 0811 hrsday 0811 hrsday
दहमजचल परिश Himachal Pradesh HPSEBL has only 2 agriculture consumers and uninterrupted
power is being supplied to agriculture sector
HPSEBL has only 2 agriculture consumers and uninterrupted
power is being supplied to agriculture sector
रमम कशमीि Jammu amp Kashmir Data not received Data not received
परजब Punjab 379 hrsday 379 hrsday
िजरसथजन Rajasthan 0630 hrsday 0630 hrsday
उतति परिश Uttar Pradesh 2157 hrsday 2157 hrsday
उततिजखड Uttarakhand 2359 hrsday 2359 hrsday
पशचिमी कषतर Western Region
छततीसगढ़ Chhattisgarh 18 hrsday 18 hrsday
गरिजत Gujarat 8 hrsday 8 hrsday
मधय परिश Madhya Pradesh Three-Phase Supply(Irrigation)- 0953 hrs day Three-Phase
(Mixed) Supply - 2334 hrs day
Three-Phase Supply(Irrigation)- 0953 hrs day Three-Phase
(Mixed) Supply - 2334 hrs day
महजिजषटर Maharashtra Three-Phase Supply(Irrigation)- 9 hrs day Three-Phase Supply(Irrigation)- 9 hrs day
गोवज Goa No restriction No restriction
दकषकषणी कषतर Southern Region
आनधर परिश Andhra Pradesh 07 hrsday 07 hrsday
तलगजनज Telangana 24 hrsday 24 hrsday
कनजाटक Karnataka 6 hrsday 6 hrsday
किल Kerala No Restrictions No Restrictions
तममल नजड Tamil Nadu 9 hrsday (6 hrs during day time and 3 hrs during night time) 9 hrsday (6 hrs during day time and 3 hrs during night time)
पडचिी Puducherry No Restrictions No Restrictions
परवी कषतर Eastern Region
बबहजि Bihar 18 hrsday 18 hrsday
झजिखणड Jharkhand 20 hrsday 20 hrsday
ओडडशज Odisha 24 hrsday 24 hrsday
पशशचम बगजल West Bengal 23 hrsday 23 hrsday
28
मारच 2019 कषि कषतर को षिदयत आपरतच का षििरण Power Supply to Agricultural Sector during March2019
राजय कषतर State Regionऔसत वरवदयत आपरत ण घनरो म Average Hours of Supply
On segregated feeders
SNo Contents Page
1 Growth of Installed Capacity since 6th Plan 29
2 Progress of Transmission Sector since 6th Plan 30
3 All India Yearly Coal consumption for Power Generation (Utilities)
4 All India Annual Per Capita Consumption of Electricity since -2006
5 Average cost of power supply amp Average realisation (Paisakwh)
6 Growth of Rural Electrification amp Pump Sets Energisation
7 Status of Hydro Schemes Cleared by the CEA in Apr-2019
Section G - Growth of Power Sector
31
32
(In MW)
Coal Gas Diesel Total
End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472
End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634
End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537
End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596
End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921
End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703
End of 12th Plan 19216288 2532938 83763 21832988 6780 4447842 50018 31960630
Up to Apr-2019 20070450 2493722 63763 22627934 678000 4539922 7764163 35610019
Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-17) = 51529 MW
Electricity Generation (MU) Targets and Achievements for 2016-17
Coal Gas Diesel Nuclear Hydro Res Total
2007045 2493722 637629 678000 453992 77641625 22925174
29
1 Growth of Installed Capacity Since 6th Plan
Plan YearThermal
Nuclear Hydro RES (MNRE) Total
2007045
2493722637629
678000
4539922
77641625
Total Installed Capacity 35610019 MW
Coal Gas Diesel Nuclear Hydro Res
Progress of Transmission Sector in the Country up to April 2019
1 TRANSMISSION LINES (All fig in CKM)
At the end of
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
6th plan 0 0 0 0 0 0 0 0 0 0 0 0 1831 4198 0 6029 1641 44364 0 46005 3472 48562 0 52034
7th plan 0 0 0 0 0 0 0 0 0 0 0 0 13068 6756 0 19824 4560 55071 0 59631 17628 61827 0 79455
8th plan 0 0 0 0 1634 0 0 1634 0 0 0 0 23001 13141 0 36142 6564 73036 0 79600 31199 86177 0 117376
9th plan 0 0 0 0 3234 1504 0 4738 751 409 0 1160 29345 20033 0 49378 8687 88306 0 96993 42017 110252 0 152269
10th plan 0 0 0 0 4368 1504 0 5872 1775 409 0 2184 48708 24730 0 73438 9444 105185 0 114629 64295 131828 0 196123
11th Plan 0 0 0 0 5948 1504 1980 9432 4839 411 0 5250 71023 30191 5605 106819 10140 125010 830 135980 91950 157116 8415 257481
12th Plan 6124 0 0 6124 5948 1504 1980 9432 25465 1177 4598 31240 92482 48240 17065 157787 11014 151276 978 163268 141033 202197 24621 367851
13th Plan (Up
to Mar2019)6124 0 0 6124 5948 1504 1980 9432 33692 1512 6605 41809 101335 58238 21173 180746 11734 162552 1010 175296 158833 223806 30768 413407
13th Plan (Up
to Apr-19)6124 0 0 6124 5948 1504 1980 9432 33745 1512 6605 41862 101335 58258 21173 180766 11734 162953 1010 175697 158886 224227 30768 413881
27150 600 MW of 132 kV Inter-Regional power transmission capacity links which are operated radially from time to time is not added in the total
75050
47900
24000
99050
30
Grand Total
Note - The figure upto the end of 10th plan in for stringing progress including the lines not commissioned Now only commissioned lines are reckoned Accordingly the figure for 10th plan (end) may read
as 187555 after adjusting with (-) 10852 Ckm
Inter-regional Power Transfer Capacity (MW)
plusmn 800 kV HVDC plusmn 500 kV HVDC 765 kV 400 kV 220 kV
IR addition in 12th
Plan (up to March
2017)
Inter-regional
Transmission
Capacity at the end
of Plan Period 2017-
22 (as on April19)
IR at the end of 11th
PlanIR at the end of 12th
Plan
IR Capacity Addition
at the end of Plan
Period 2017-22 (Till
April 19)
2004-05 27800
2005-06 28100
2006-07 30200
2007-08 33000
2008-09 35500
2009-10 36700
2010-11 38700
2011-12 41756
2012-13 45460
2013-14 48940
2014-15 53040
2015-16 54590
2016-17 57430
2017-18 60800
2018-19 62890
Year
2005-06
2006-07
2007-08
2008-09
2009-10
2010-11
2011-12
2012-13
2013-14
2014-15
2015-16
2016-17
2017-18
2018-19
2004-05 254 209 7568
2005-06 260 221 7636
2006-07 276 227 7423
2007-08 293 239 7727
2008-09 340 263 8713
2009-10 355 268 8870
2010-11 398 303 11975
2011-12 455 330 13514
2012-13 501 376 14867
2013-14 518 175
2014-15 520
Source- PFC Reports on the performance of State Power Utilities 31
1181
7335
7786
91441
8188
88363
957
1010
1075
1122
1149
(GrossGen+ Net Import) Mid-year population Provisional
5 Average cost of power supply amp average realization ( paiseKWH )
Yearcost of supply
(paiseunit)
Realization(paiseunit)
Including AgricultureOnly
Agriculture
6719
7171
3 All India yearly Coal Consumption for Power Generation (Utilities)
YEARCoal Consumption
Million Tonnes
4 All India Annual per Capita consumption of Electricity Since 2006
Per Capita Consumption ( kWh)
6314
Sl
NoExecuting Agency
Installed
Capacity (MW)Cost (Rs crore)
Date of
Clearance
32
Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as
Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received
from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made
available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified
villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is
independent of the earlier published reports
No Hydro Electric Project has been issued concurrenceAppraisal letter by CEA during April 2019
7 Status of Hydro Schemes Cleared by the CEA in Apr-2019
Name of Scheme
1999-002000-01
297594
010408 to 310309010409 to 310310
10th Plan
2005-062006-07
322968331020
6 Growth Of Rural Electrification amp Pumpsets Energisation
Plan Year
9th Plan2002-03
134092626
4111
Pump Sets Energised Villages Electricfied (Nos)
2001-02
284064367244
1218
27801997-981998-99
3207
482864
12632
1576036
4451722594
15455554
2314176
397343611750
2093311060316074
65109527813884
46708
18423975
499150
2003-042004-05
5743
9769
Cumu upto End of 10th Plan
010407 to 310308
010410 to 310311557976840909
010411 to 310312
412667
86293726
No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification
since 2004-05
65291374575 296361511th Plan
Cumu upto End of 11th Plan
596556 21212860
557439Cummulative up to end of 12th Plan
SN Contents Page
1 Rate of sale of power for the year 2016-17 33-41
RATE OF SALE OF POWER FOR THE YEAR 2016-17
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) NORTHERN REGION
CENTRAL SECTOR
BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 18000 66900 19800
CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 54000 222400 21600
CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 30000 144400 19600
CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 23100 91700 42600
PARBATI - III HPS NHPC LTD HYDRO-HYDRO 52000 68200 54800
DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 28000 95600 30000
CHUTAK NHPC LTD HYDRO-HYDRO 4400 22000 79800
DULHASTI HPS NHPC LTD HYDRO-HYDRO 39000 228000 56400
SALAL HPS NHPC LTD HYDRO-HYDRO 69000 342300 11000
TANAKPUR HPS NHPC LTD HYDRO-HYDRO 9420 43000 29600
URI HPS -I NHPC LTD HYDRO-HYDRO 48000 280300 16000
URI HPS - II NHPC LTD HYDRO-HYDRO 24000 147300 48600
NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 4500 24600 88200
SEWA - II NHPC LTD HYDRO-HYDRO 12000 47100 43400
ANTA CCPP NTPC LTD THERMAL-GASN 41930 67539 32400
AURAIYA CCPP NTPC LTD THERMAL-GASN 66336 53501 39100
BADARPUR TPS NTPC LTD THERMAL-COAL 70500 159153 44800
DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 84000 296170 42300
DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 98000 526686 46300
DADRI CCPP NTPC LTD THERMAL-GASHSD 82978 227469 33000
FARIDABAD CCPP NTPC LTD THERMAL-GASN 43159 115577 30800
RIHAND STPS I NTPC LTD THERMAL-COAL 100000 596766 24500
RIHAND STPS II NTPC LTD THERMAL-COAL 100000 737069 24600
RIHAND STPS III NTPC LTD THERMAL-COAL 100000 706546 30600
SINGRAULI STPS NTPC LTD THERMAL-COAL 200000 1394068 20400
TANDA TPS NTPC LTD THERMAL-COAL 44000 295438 40800
UNCHAHAR TPS I NTPC LTD THERMAL-COAL 42000 256454 39800
UNCHAHAR TPS II NTPC LTD THERMAL-COAL 42000 273577 38900
UNCHAHAR TPS III NTPC LTD THERMAL-COAL 21000 142780 43000
KOLDAM NTPC LTD HYDRO-HYDRO 80000 363260 43600
NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 303575 25841
RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 108000 668677 35374
NJHPS SJVNL HYDRO-HYDRO 150000 699496 23820
RAMPUR HPS SJVNL HYDRO-HYDRO 41202 195982 32260
TEHRI HPP THDC HYDRO-HYDRO 100000 272543 51800
KOTESHWAR HEP THDC HYDRO-HYDRO 40000 106244 53400
IGSTPS JHAJJAR ARAVALI P CPL THERMAL-COAL 150000 510429 49490
NEYVELI BARSINGSAR NEYVELI LIG CORP LTD THERMAL-LIG 25000 127520 38040
STATE SECTOR
PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 21000 14222 48200
PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 21000 19205 48400
PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 25000 102257 42600
PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 25000 62107 41800
DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 60000 312213 41000
RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 120000 35767442200
WYC HYDEL STATION HPGCL HYDRO-HYDRO 6240 20365 24900
GIRI POWER HOUSE HPSEB HYDRO-HYDRO 6000 13958 7600
ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 1695 5467 11900
BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 12000 18528 6700
GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 2250 7462 22500
BASSI POWER HOUSE HPSEB HYDRO-HYDRO 6600 29649 7500
BINWA POWER HOUSE HPSEB HYDRO-HYDRO 600 2749 19300
ANNEXURE-I
RATE OF SALE OF POWER FOR THE YEAR 2016-2017
Page 33
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) GAJ POWER HOUSE HPSEB HYDRO-HYDRO 1050 2914 26700
BANER POWER HOUSE HPSEB HYDRO-HYDRO 1200 2864 16200
HOLI POWER HOUSE HPSEB HYDRO-HYDRO 300 616 22500
THIROT POWER HOUSE HPSEB HYDRO-HYDRO 450 1126 22500
KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 1200 3064 22500
LARJI POWER HOUSE HPSEB HYDRO-HYDRO 12600 53677 23700
NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 250 750 31000
CHABA POWER HOUSE HPSEB HYDRO-HYDRO 175 465 23300
RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 150 101 13400
SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 200 000 22500
KILLAR HPSEB HYDRO-HYDRO 030 050 22500
BHABA AUGUMENP H HPSEB HYDRO-HYDRO 450 1276 22500
BS CHAMBA HPSEB HYDRO-HYDRO 045 099 19500
GUMMA HPSEB HYDRO-HYDRO 300 423 22500
GAS TURBINE POWER STATION IPGCL THERMAL-GAS 27000 67233 39300
PPS-I PPCL THERMAL-GAS 33000 175905 38300
PPS-III PPCL THERMAL-GAS 137120 196879 36100
LOWER JHELUM JampKPDD HYDRO-HYDRO 10500 60214 5100
UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 2260 10514 6300
UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 10500 44202 8500
GANDHARBAL JampKPDD HYDRO-HYDRO 1500 8925 4700
KARNAH MPH JampKPDD HYDRO-HYDRO 200 1122 31000
CHENANI I JampKPDD HYDRO-HYDRO 2330 10892 6600
CHENANI II JampKPDD HYDRO-HYDRO 200 1188 9300
CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 750 3634 14200
IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 375 2108 18500
IGO MERCHELLONG JampKPDD HYDRO-HYDRO 300 1572 29700
PAHALGAM MHP JampKPDD HYDRO-HYDRO 450 1713 32900
MARPACHOO JampKPDD HYDRO-HYDRO 075 375 29800
HAFTAL JampKPDD HYDRO-HYDRO 100 483 28700
SANJAK JampKPDD HYDRO-HYDRO 126 441 36000
SEWA-III JampKPDD HYDRO-HYDRO 900 3273 20200
BHADERWAH JampKPDD HYDRO-HYDRO 150 935 8900
BAZGO JampKPDD HYDRO-HYDRO 030 108 33300
SUMOOR JampKPDD HYDRO-HYDRO 010 045 35400
HUNDER JampKPDD HYDRO-HYDRO 040 176 26200
STAKNA JampKPDD HYDRO-HYDRO 400 1933 4100
KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 124000 662879 31360
SURATGARH TPS RRVUNL THERMAL-COAL 150000 402328 41730
CHHABRA TPS 1amp 2 RRVUNL THERMAL-COAL 50000 305946 36700
CHHABRA TPS 3 RRVUNL THERMAL-COAL 25000 151536 36700
CHHABRA TPS 4 RRVUNL THERMAL-COAL 25000 155896 36700
RAMGARH GT POWER PROJECT RRVUNL THERMAL-COAL 22050 43177 41800
RAMGARH GAS T P PROJECT 3 RRVUNL THERMAL-GAS 5000 93615 41800
DHOLPUR C C POWER PROJECT RRVUNL THERMAL-R-LNG 33000 9486 46110
MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 14000 20855 34192
MINI MICRO HYDEL (MMH) P S RRVUNL HYDRO-HYDRO 2385 851 37800
KALISINDH TPP 1 RRVUNL THERMAL-COAL 60000 341543 45000
KALISINDH TPP 2 RRVUNL THERMAL-COAL 60000 211588 45000
KHARA HEP UPJVNL HYDRO-HYDRO 7200 26654 7200
MATATILLA HEP UPJVNL HYDRO-HYDRO 3060 12219 6500
OBRA HEP UPJVNL HYDRO-HYDRO 9900 21517 6300
RIHAND UPJVNL HYDRO-HYDRO 30000 57369 5500
ANPARA A TPS UPRVUNL THERMAL-COAL 63000 317536 27000
ANPARA B TPS UPRVUNL THERMAL-COAL 100000 705605 22700
ANPARA D UPRVUNL THERMAL-COAL 100000 300158 39800
HARDUAGANJ TPS UPRVUNL THERMAL-COAL 16500 45817 49200
HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 50000 304389 46600
OBRA A TPS UPRVUNL THERMAL-COAL 28800 13158 34000
OBRA B TPS UPRVUNL THERMAL-COAL 100000 328124 21900
Page 34
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) PANKI TPS UPRVUNL THERMAL-COAL 21000 66488 50300
PARICHHA TPS UPRVUNL THERMAL-COAL 22000 38762 49400
PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 42000 231931 45600
PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 50000 276722 50400
CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 24000 70845 8290
CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 14400 75366 8390
DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 3375 9595 12080
DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 5100 18701 10520
KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4140 17359 12330
KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 12000 33001 9420
KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 3000 11953 8320
TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 9000 33983 12460
MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 30400 124510 16110
RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 19800 17897 10550
MPUR UTTARAKHAND JVNL HYDRO-HYDRO 930 5121 19200
PATHRI UTTARAKHAND JVNL HYDRO-HYDRO 2040 11636 14200
GALOGI UTTARAKHAND JVNL HYDRO-HYDRO 300 648 12500
PRIVATE SECTOR
MGTPP CLP INDIA PVT LTD THERMAL-COAL 132000 268902 41940
SHRINAGAR HEP ALAKNANDA HPCL HYDRO-HYDRO 33000 127414 48800
GAMA INFRAPROP CCPP GAMA INFRAPROP PVT THERMAL-GAS 22500 52686 47000
PPGCL (BARA) JP POWER VENTURES LTD THERMAL-COAL 198000 448200 38500
MALANA HEP MALANA PCL HYDRO-HYDRO 8600 26354 29792
MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 10000 30369 32580
ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 19200 56347 36079
KASHANG HEP H P PCL HYDRO-HYDRO 19500 5034 29200
BASPA-II HEP HBPCL HYDRO-HYDRO 30000 132769 13600
KARCHAM WANGTOO HEP HBPCL HYDRO-HYDRO 100000 434386 36600
RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 108000 582600 43700
RITHALA COMBI CY POWER PLANT TATA POWER DDL THERMAL-GAS 9480 000 11900
RAJPURA TPS NABHA POWER LTD THERMAL-GAS 140000 901484 39000
TALWANDI SABO POWER LTD TALWANDI SABO POWER LTD THERMAL-COAL 198000 636040 49548
ROJA THERMAL POWER STATION ROJA POWER SCL THERMAL-COAL 120000 727200 43400
KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 34400 63400
BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 36000 62600
MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 38200 60800
UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 37900 61500
KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 42300 58800
LALITPUR PGCL BAJAJ ENERGY PVT LTD THERMAL-COAL 198000 359400 47300
PRAYAGRAJ PGCL PRAYAGRAJ PGCL THERMAL-COAL 132000 448200 38595
KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 132000 783182 33438
WESTERN REGION
CENTRAL SECTOR
INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 100000 325333 23892
OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 52000 141663 34001
GANDHAR CCPP NTPC LTD THERMAL-GAS 65739 221924 28700
KAWAS CCPP NTPC LTD THERMAL-GASN 65620 167929 27000
KORBA I amp II NTPC LTD THERMAL-COAL 210000 1499171 20500
KORBA III NTPC LTD THERMAL-COAL 50000 358746 26600
SIPAT STPS I NTPC LTD THERMAL-COAL 198000 1479902 26800
SIPAT STPS II NTPC LTD THERMAL-COAL 100000 766549 26500
VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 126000 693142 25800
VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 100000 608781 23800
VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 100000 673475 27600
VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 100000 655924 32900
VINDHYACHAL STPS V NTPC LTD THERMAL-COAL 50000 328265 31700
MOUDA I NTPC LTD THERMAL-COAL 100000 343130 44500
MOUDA Ii NTPC LTD THERMAL-COAL 66000 40637 39900
RATNAGIRI GAS amp POWER PVT LTD RGPPL THERMAL-GAS 196708 442485 47000
KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 000 24729
TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 32000 201227 10740
Page 35
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 365122 19069
TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 787444 29324
STATE SECTOR
GSEG-HAZIRA15610 MW GUJARAT S ENEGEN LTD THERMAL-GAS 15610 1805 28200
GSEG-HAZIRA35143 MW GUJARAT S ENEGEN LTD THERMAL-GAS 35130 22276 51300
GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 21978 51800
AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 13929 26100
KORBA TPS EAST CSPGCL THERMAL-COAL 44000 198673 33880
DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 365808 27570
KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 316500 30420
HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 532878 19410
CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 515 58300
MTTPS CHAMPA U-I CSPGCL THERMAL-COAL 50000 220376 39000
MTTPS CHAMPA U-II CSPGCL THERMAL-COAL 50000 23709 10000
SHP GANGREL CSPGCL HYDRO-HYDRO 1000 2350 36790
BANGO HEP CSPGCL HYDRO-HYDRO 12000 14662 8900
MHP KORBA WEST CSPGCL HYDRO-HYDRO 170 859 38190
SIKASAR HEP CSPGCL HYDRO-HYDRO 700 418 26870
DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8843 74500
DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 19446 51500
GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 66388 71600
GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127488 41300
KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 96072 43900
KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 29841 56400
SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 184966 58800
UKAI 1-5 GSECL THERMAL-COAL 85000 204891 46900
UKAI TPS 6 GSECL THERMAL-COAL 50000 284448 48200
WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 271999 58300
WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 82808 44100
KADANA HPS GSECL HYDRO-HYDRO 24200 34433 16800
UKAI HPS GSECL HYDRO-HYDRO 30500 40585 6100
TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 123000 11500
BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 8900 10900
BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 7200 27500
JHINNA HPS MPPGCL HYDRO-HYDRO 2000 9700 18500
RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 44300 3400
GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 17300 4600
SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 4100 16900
MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 14600 27000
PENCH HPS MPPGCL HYDRO-HYDRO 16000 23700 8100
RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 3000 16900
AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 134400 35100
SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 283800 38700
SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 344600 34300
SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 111600 61600
SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 211800 58000
SSTPS PH-I MPPGCL THERMAL-COAL 120000 233100 84300
BHUSAWAL TPS MSPGCL THERMAL-COAL 142000 566258 51100
CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1365682 33700
KHAPERKHEDA MSPGCL THERMAL-COAL 134000 706207 39100
KORADI TPS MSPGCL THERMAL-COAL 62000 443206 42000
NASIK TPS MSPGCL THERMAL-COAL 63000 297275 47000
PARLI TPS MSPGCL THERMAL-COAL 113000 175934 71600
PARAS MSPGCL THERMAL-COAL 50000 267931 38700
URAN CCPP MSPGCL THERMAL-GAS 67200 320330 30600
KOYANA MSPGCL HYDRO-HYDRO 195600 328155 13100
SMALL HYDRO POWER PLANTS MSPGCL HYDRO-HYDRO 45400 93062 30500
BHIRA MSPGCL HYDRO-HYDRO 8000 10046 8400
TILLARI MSPGCL HYDRO-HYDRO 8900 10584 3100
SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 233298 20500
SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 87633 20500
PRIVATE SECTOR
Page 36
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 81282 46750
JNSTPP(JAYPEE NIGRIE) JP POWER VENTURES LTD THERMAL-COAL 132000 726695 29310
MB POWER MB POWER THERMAL-COAL 120000 345632 38310
ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 754922 28671
ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 780761 23495
ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 198000 1263784 32090
ADANI POWER MAHARA ADANI POWER LTD THERMAL-COAL 330000 1666191 34124
AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 170065 36827
SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 252035 45129
ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 458551 36000
ESSAR POWER MP LTD ESSAR POWER MP LTD THERMAL-COAL 60000 243040 28600
VEDANTA LTD (P P -I) VEDANTA LTD THERMAL-GAS 3000 15044 24000
VEDANTA LTD (P P -II) VEDANTA LTD THERMAL-GAS 3000 21293 24000
PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 8234600 24000
165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 5850 64390
145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 68717 40349
SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 132655 28776
SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 144686 38567
MUNDRA UMPPCOASTAL GUJARAT POWER
LTD THERMAL-IMP COAL 400000 2530300
23900
LANCO AMARKANTAK TPP PATHADIH
U-ILANCO AMARKAN POWER LTD THERMAL-COAL 30000 195500
29200
LANCO AMARKANTAK TPP PATHADIH
U-IILANCO AMARKAN POWER LTD THERMAL-COAL 30000 206900
27600
BARADARHA TPS D B POWER LTD THERMAL-COAL 120000 677373 29200
JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 405000 28900
JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 453000 40500
DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 339437 40700
TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 293400 44000
TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 137200 37000
TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 174900 44000
BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 92900 14100
BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23700 34300
KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 27600 48300
CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2530300 23900
BHANDARDRA HEP -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 2475 54900
SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 161400 26500
SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 445000 39000
SOTHERN REGION
CENTRAL SECTOR
NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 325699 54820
NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 305532 39880
NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 998805 38510
NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 113016 54070
NEYVELI TAMILNADU POWER LTD JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 625274 42200
VALLUR TPS NTPC TECL THERMAL-COAL 150000 856438 42350
R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 1493 84300
RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1502919 29400
RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 341291 31800
SIMHADRI I NTPC LTD THERMAL-COAL 100000 688382 36800
SIMHADRI II NTPC LTD THERMAL-COAL 100000 663657 43400
KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 593110 31324
MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 291625 21764
KKNPP-1 amp 2 NPCIL NUCLEAR-NUCLEAR 200000 572609 40948
MINICOY LAKSHADEEP THERMAL-DIESEL 340 770 29600
KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1097 29600
AMINI LAKSHADEEP THERMAL-DIESEL 265 509 29600
ANDROTT LAKSHADEEP THERMAL-DIESEL 219 524 29600
KALPENI LAKSHADEEP THERMAL-DIESEL 175 356 29600
AGATTI LAKSHADEEP THERMAL-DIESEL 195 658 29600
KADMAT LAKSHADEEP THERMAL-DIESEL 190 414 29600
KILTAN LAKSHADEEP THERMAL-DIESEL 150 269 29600
CHETLET LAKSHADEEP THERMAL-DIESEL 100 139 29600
BITRA LAKSHADEEP THERMAL-DIESEL 043 024 29600
BANGARAM LAKSHADEEP THERMAL-DIESEL 018 009 29600
Page 37
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) STATE SECTOR
Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 721811 46500
Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 50000 336142 46500
RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 237358 46500
RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 239926 46500
RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 124500 46500
SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 62109 46500
UPPER SILERU APGENCO HYDRO-HYDRO 24000 33000 46500
LOWER SILERU APGENCO HYDRO-HYDRO 46000 81066 46500
DONKARAI APGENCO HYDRO-HYDRO 2500 6007 46500
PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 1262 46500
CHETTIPETA APGENCO HYDRO-HYDRO 100 214 46500
MUCHKUND APGENCO HYDRO-HYDRO 12000 37571 46500
NAGARJUNASAGAR RCPH APGENCO HYDRO-HYDRO 9000 606 46500
TUNGABHADRA HES amp HAMPI(AP
Share)
APGENCO HYDRO-HYDRO 7200 6100 46500
KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 352232 42600
KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 288131 32500
KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 319272 46500
RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 40073 44300
KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 308317 46000
KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 308963 51300
SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 61004 76600
NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 17960 75300
PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 20873 58300
POCHAMPAD-I TSPGENCO HYDRO-HYDRO 2700 5455 29800
POCHAMPAD-II TSPGENCO HYDRO-HYDRO 900 1932 40700
NIZAMSAGAR TSPGENCO HYDRO-HYDRO 1000 1126 53400
RAICHUR TPS 1 to 7 KPCL THERMAL-COAL 147000 890866 43800
RAICHUR TPS 8 KPCL THERMAL-COAL 25000 159523 48200
BELLARI TPS 1 KPCL THERMAL-COAL 50000 318679 51100
BELLARI TPS 2 KPCL THERMAL-COAL 50000 232347 55600
BELLARI TPS 3 KPCL THERMAL-COAL 70000 47565 34400
BHADRA PH KPCL HYDRO-HYDRO 3920 2369 45900
GERUSUPPA PH KPCL HYDRO-HYDRO 24000 26990 22000
GHAT PRABHA HEP KPCL HYDRO-HYDRO 3200 4777 25300
KADRA HPS KPCL HYDRO-HYDRO 15000 16889 26800
NAGJHARI KPCL HYDRO-HYDRO 90000 155159 9800
KODASALLI DPH KPCL HYDRO-HYDRO 12000 14854 19200
MUNIRA+MGH+SPH+SPH KPCL HYDRO-HYDRO 22640 48211 7900
SHARAVATHY HPS KPCL HYDRO-HYDRO 108550 276215 5400
ALMATTI DPH KPCL HYDRO-HYDRO 29000 39611 24600
VARAHI UGPH KPCL HYDRO-HYDRO 46000 71368 15600
IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 17196 15300
IDUKKI HPS KSEB HYDRO-HYDRO 78000 137905 15300
KAKKAD HPS KSEB HYDRO-HYDRO 5000 13063 15300
KALLADA HPS KSEB HYDRO-HYDRO 1500 4436 15300
KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 46544 15300
KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 635 15300
LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 30822 15300
MALANKARA HPS KSEB HYDRO-HYDRO 1050 2474 15300
MATTUPETTY KSEB HYDRO-HYDRO 200 230 15300
MALAMPUZHA KSEB HYDRO-HYDRO 250 063 15300
CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 864 15300
URUMI ST I amp II KSEB HYDRO-HYDRO 615 903 15300
LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 248 15300
NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7765 19625 15300
PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 16601 15300
PANNIAR HPS KSEB HYDRO-HYDRO 3240 6217 15300
PORINGALKUTHU KSEB HYDRO-HYDRO 3600 10052 15300
PORINGALKUTHU LBE KSEB HYDRO-HYDRO 1600 9438 15300
PEPPARA KSEB HYDRO-HYDRO 300 395 15300
POOZHITHODE KSEB HYDRO-HYDRO 480 1045 15300
Page 38
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) PEECHI KSEB HYDRO-HYDRO 125 040 15300
RANI-PERUNADU KSEB HYDRO-HYDRO 400 585 15300
SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 79783 15300
SENGULAM HPS KSEB HYDRO-HYDRO 5120 11558 15300
SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 16711 15300
VILANGAD KSEB HYDRO-HYDRO 750 1578 15300
BARAPOLE KSEB HYDRO-HYDRO 1500 1932 15300
VELLATHOOVAL KSEB HYDRO-HYDRO 360 305 15300
CHIM0NY KSEB HYDRO-HYDRO 250 156 15300
ADYANPARA KSEB HYDRO-HYDRO 350 501 15300
BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 554 15300
KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 3801 15300
KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 23132 32800
ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 14416 62280
METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 523970 62280
METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 321270 62280
NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 336575 62280
NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 591240 62280
TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 508966 62280
KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 30897 62280
VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 18720 90699 62280
KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 33593 62280
BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 1047 62280
PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 1250 62280
PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 330 62280
MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 4897 62280
MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 032 62280
KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15681 62280
KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 40608 62280
KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 21342 62280
KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 4717 62280
KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4322 62280
KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2399 62280
METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 4416 62280
METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 8035 62280
BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2187 62280
BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2359 62280
BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2511 62280
BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 1949 62280
BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 1819 62280
POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 172 62280
SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 241 62280
MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 026 62280
THIRUMOORTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 136 62280
PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 9309 62280
VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 353 62280
SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 4192 62280
PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 6571 62280
SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 1186 62280
SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6319 62280
ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 6122 62280
KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 28674 62280
SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 18381 62280
SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 4258 62280
KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 12680 62280
KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4201 62280
ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 000 62280
PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 19175 62280
AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 078 62280
BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 504 62280
BHAVANI KATTALAI (BKB)(IIIampIII BB I amp II)TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 5847 62280
PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 000 62280
Page 39
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) SRI DAMODARAM STPS APPDCL THERMAL-COAL 160000 808108 36300
PRIVATE SECTOR
KARUPPUR TANJORE LANCO TANJORE PCL THERMAL-GAS 12000 48096 28770
SIMHAPURI ENERGY LTD SIMHAPURI ENERGY LTD THERMAL-COAL 60000 143900 39100
JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 7111 45500
SBU 1 JSW ENERGY LTD
VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 26000 159100
43300
SBU 2 JSW ENERGY LTD
VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 60000 247900
42800
LANCO KPLLANCO KONDAPALLI POWER
LTDTHERMAL-GAS 36814 85060
25776
LANCO KPL STG -IILANCO KONDAPALLI POWER
LTDTHERMAL-GAS 36600 12979
46330
LANCO KPL STG -IIIALANCO KONDAPALLI POWER
LTDTHERMAL-GAS 37100 85710
46330
LANCO KPL STG -III BLANCO KONDAPALLI POWER
LTDTHERMAL-GAS 37100 43639
46330
HINDUJA NATIONAL PCL HINDUJA NATIONAL PCL THERMAL-COAL 104000 303000 38200
MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 121164 49940
UDUPI POWER COR LTD ADANI POWER LTD THERMAL-COAL 120000 754613 42500
SPECTRUM POWER GENERATION
LTD SPECTRUM PG LTD THERMAL-GASN 20525 9256812
34952
TAQA NEYVELI POWER COM PVT
LTD TAQA NEYVELI THERMAL-LIG 25000 5840
34500
ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 251000 51000
ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 207860 36800
GMR VEMAGIRI POWER GENERATION
LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 30117
46450
EASTERN REGION
CENTRAL SECTOR
MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 64675 53113
MTPS STAGE - II KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 39000 1432 69138
BOKARO `B` TPS DVC THERMAL-COAL 63000 145670 31539
MEJIA TPS U 1-3 DVC THERMAL-COAL 63000 348298 31552
MEJIA TPS U 4 DVC THERMAL-COAL 21000 116099 34997
MEJIA TPS U 5-6 DVC THERMAL-COAL 50000 276427 35976
MEJIA TPS U 7-8 DVC THERMAL-COAL 100000 552854 36991
DURGAPUR STEEL TPS DVC THERMAL-COAL 100000 665550 39323
DURGAPUR TPS DVC THERMAL-COAL 21000 59270 35416
RAGHUNATHPUR TPS DVC THERMAL-COAL 120000 201650 35326
MAITHON HYDEL STA DVC HYDRO-HYDRO 6320 12200 17984
CHANDRAPURA TPSU1-3 DVC THERMAL-COAL 42000 257610 35095
CHANDRAPURA TPSU7-8 DVC THERMAL-COAL 50000 306673 34987
KODERMA TPS DVC THERMAL-COAL 100000 380180 38131
PANCHET HPS DVC HYDRO-HYDRO 8000 13360 17984
TILLAYA HPS DVC HYDRO-HYDRO 400 1410 17984
RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34700 35400
TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 277300 23200
TLDP -III NHPC LTD HYDRO-HYDRO 13200 55400 62000
TLDP -IV NHPC LTD HYDRO-HYDRO 16000 60300 25600
FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 957219 33700
FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 308943 41000
BONGAINGAON TPS NTPC LTD THERMAL-COAL 25000 153663 58600
KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 542277 34200
KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 942591 34200
BARH-II NTPC LTD THERMAL-COAL 132000 728021 44500
TALCHER TPS NTPC LTD THERMAL-COAL 46000 335521 30100
TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 702319 25600
TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1436521 24700
STATE SECTOR
BTPS(RampM) BIHAR STATE PGCL THERMAL-COAL 22000 12142 39700
BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 98331 10602
HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 50593 9482
CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 19689 2605
RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 53192 6033
UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 147208 14637
Page 40
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 60353 4519
IB TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 288567 25000
J P H GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 210 038 61100
MEYONG CHU GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 400 1086 61100
TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 122667 38200
DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 214339 43321
KOLAGHAT THERMAL POWER
STATION
WEST BENGAL PDCL THERMAL-COAL 126000 538269 31603
BAKRESHWAR THERMAL POWER
PLANT
WEST BENGAL PDCL THERMAL-COAL 105000 634876 32154
BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 45000 166855 33299
SANTHALDIH THERMAL POWER
STATION
WEST BENGAL PDCL THERMAL-COAL 50000 336442 34932
SAGARDIGHI THERMAL POWER
PROJECT
WEST BENGAL PDCL THERMAL-COAL 160000 423121 34705
JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 20344 68900
RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 24559 68900
TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 4623 68900
PURULIA PUMPED STORAGE
PROJECT
WEST BENGAL SEDCL HYDRO-HYDRO 90000 108816 68900
MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2768 68900
PRIVATE SECTOR
CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 49474 20230
CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 555500 70200
HALDIA ENERGY HALDIA ENERGY LTD THERMAL-COAL 60000 371000 50400
DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3688 63400
KAMALANGA TPS GMR KAMALANGA ENERGY LTD THERMAL-COAL 105000547670
33300
ADHUNIK POWER U-1 ADHUNIK POWER THERMAL-COAL 27000 158 44060
ADHUNIK POWER U-2 ADHUNIK POWER THERMAL-COAL 27000 168 44250
VL-JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 332800 23622
JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 43000 45250
JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 71700 37030
JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 70700 35920
JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 71100 38870
JOJOBERA UNIT 5 TATA POWER COM LTD THERMAL-COAL 12000 79300 44560
JOJOBERA UNIT 6 TATA POWER COM LTD THERMAL-WHR 12000 83700 12840
IEL KALINGANAGAR U-I TATA POWER COM LTD THERMAL-WG 6750 33400 22500
IEL KALINGANAGAR U-II TATA POWER COM LTD THERMAL-WG 6750 34800 22500
MAITHON UNIT 1 amp 2 TATA POWER COM LTD THERMAL-COAL 105000 678000 36100
HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 27500 24340
HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 28400 24340
HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 15800 24310
NORTH EASTERN REGION
CENTRAL SECTOR
LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 74100 36600
AGARTALA GT NEEPCO THERMAL-GAS 13500 88611 27210
ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 153111 32310
DOYANG HEP NEEPCO HYDRO-HYDRO 7500 25598 49801
KOPILI HEP NEEPCO HYDRO-HYDRO 20000 98186 11491
KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 19582 20237
KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 10310 17968
RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 124093 22945
TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 10100 17344 39000
STATE SECTOR
HYDRO POWER (122 Stns) ITANAGAR GOVT OF ARUNACHAL
PRADESHHYDRO-HYDRO 6971 6217270
24600
KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39514 17337
LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 82327 36810
NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 33318 48290
MYNTRIANG SHEP ST II ASSAM POWER GENCO HYDRO-HYDRO 300 567 35776
LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 9130 49200
LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 012 49200
DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 022 49200
TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 000 49200
UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 4990 16000
UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 6476 37000
UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 16494 14600
UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 3600 9556 15000
SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 758 8000
MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44070 44800
KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 154 41400
TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 091 41400
MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 411 41400
MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 394 41400
KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 760 41400
SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 3264 41400
LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 044 41400
BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 18953 28000
ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 43585 28200
GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 4080 11100
Note
LIG Lignite N Naptha WHR Waste Heat Recovery
Page 41
Achievement
Apr-19
Thermal 9442 152
Nuclear 318 -390
Hydro 1109 4680
Bhutan Import 024 94659
All India 10893 485
Type
Thermal
Nuclear
Hydro
Bhutan Import
All India
1A
9300
9300
1 Electricity Generation for Apr-2019 (BU)
Apr-19
TypeAchievement
Apr-18
Targets Change of
Achievement
wrt Apr-2018
9896
002
3673
11235
756
331
9539
48510891039
10389
018
9442
3177
152
Change wrt Apr-18 to Apr-18
Electricity Generation During Apr-18 to Apr-18 amp Apr-19 to Apr-19 (BU)
Apr-18 to Apr-18 Apr-19 to Apr-19
11092
024002
-390331
4680756
94247
10389
10893
10100
10200
10300
10400
10500
10600
10700
10800
10900
11000
BU
Apr-18 Apr-19
10391089
00
200
400
600
800
1000
1200
BU
Apr-18 to Apr-18 Apr-19 to Apr-19
Generation from
Conventional
Sources
Generation
from
Renewable
Sources
Total Generation from
Conventional Sources
Generation from
Renewable SourcesTotal
Growth in
Conventional
Generation
Growth in
Renewable
Generation
Growth in
Total
Generation
(BU) (BU) (BU) (BU) (BU) (BU) () () ()
108929 9900 118829 103889 8443 112332 485 1726 578
Note Tentative
SlNo
Source-Wise All
India
Generation
from
Renewables Mar-2019 Mar-2018 April 2018 to March 2019 April 2017 to March 2018
1 Wind 2965930 2906760 62036380 52666090
2 Solar 4307980 3311530 39268200 25871070
3 Biomass 255320 270430 2763820 3404950
4 Bagasse 1814860 1794220 13562670 11847350
5 Small Hydro 473060 376850 8702750 7691580
6 Others 30700 33120 425280 358450
Total 9847850 8692910 126759100 101839490
Note 1) Data as received from SLDCElectricity Department of the respective states or from the electricity department
2) 25 MW Khopli-II project of NEEPCO located in Assam is considered under Small Hydro wef 01072018 Earlier it was considered under Hydro
3) Previous month generation has been taken as SLDC has not furnished generation data for the current month
Electricity Generation (Conventional and Renewable Sources)
Apr-2019 Apr-2018 Growth
1B
For the Month of Cummulative for the period
All India Generation From Renewables (All Figures are in MU)
Achievement Targets Achievement
Apr-18
Thermal 69755 1160 0 000
Hydro 0 0 0 NA
Nuclear 0 0 0 NA
All India 69755 1160 0 000
Apr-18 to Apr-18 Apr-19 to Apr-19 Change wrt Previous Year
Thermal 69755 0 00
Hydro 0000 0 NA
Nuclear 0000 0 NA
All India 69755 0 00
2
2 Generating Capacity Addition for Apr-2019 (MW)
Generating Capacity Addition during Apr-18 to Apr-18 amp Apr-19 to Apr-19
NA- Not Applicable
Achivement
wrt Apr-2018Type
Apr-19
698
000
10
20
30
40
50
60
70
80
1Apr-18 Apr-19
0000
10000
20000
30000
40000
50000
60000
70000
80000
Apr-18 to Apr-18 Apr-19 to Apr-19
1
2
3
Nuclear Hydro RES Grand TotalRegion Coal Lignite Gas Diesel Total
Northern 5036020 158000 578126 000 5772146 162000 1970777 1419902 9324825
Western 7280862 154000 1080649 000 8515511 184000 754750 2307894 11762155
Southern 4304202 314000 647366 56158 5321726 332000 1177483 3862018 10693227
Eastern 2746364 000 10000 000 2756364 000 494212 140148 3390724
North-East 77002 000 177581 3600 258183 000 142700 32429 433311
Islands 000 000 000 4005 4005 000 000 1773 5778
ALL INDIA 19444450 626000 2493722 63763 22627934 678000 4539922 7764163 35610019
Note Captive Genaration is not included in the total Captive Power capacity as on 31032017 RES as on 31032019 3
Thermal
Nuclear
3 List of Projects Commissioned During Apr-2019
4 All India Installed Capacity (MW) Region-wise as on 30-04-19
NIL
NIL
Thermal
NIL
Hydro
22627934
678000
4539922
7764163
35610019
51529
000
5000000
10000000
15000000
20000000
25000000
30000000
35000000
40000000
Thermal Nuclear Hydro RES Total Captive
Thermal Nuclear Hydro RES Total Captive
Total = 356100189
Sector
Coal Lignite Gas Diesel Total
State 6407650 129000 711871 36393 7284913 000 2987880 234793 10507586
Private 7468800 183000 1058060 27370 8737230 000 339400 7366140 16442770
Central 5568000 314000 723791 000 6605791 678000 1212642 163230 8659663
All India 19444450 626000 2493722 63763 22627934 678000 4539922 7764163 35610019
State 10507586
Private 16442770
Central 8659663
Electricity Generation (MU) Targets and Achievements for 2016-17
5 All India Installed Capacity (MW) Sector-wise as on 30-04-19
4
Grand TotalTHERMAL
Nuclear Hydro RES
RES as on 31032019
State 10507586 30
Private 16442770 46
Central 8659663 24
All India Installed Capacity(MW) (Sector-Wise)
Voltage Level
+- 500 KV HVDC
+- 800 KV HVDC
765 KV
400 KV
220 KV
All India
Voltage Level
+- 500 KV HVDC
+- 800 KV HVDC
765 KV
400 kV
220 KV
All India
5
481 401
763 474
0 0
242 53
40 20
0 0
242 53
40 20
481 401
763 474
Transmission Lines Added duringApr-18 to Apr-18 ampApr-19 to Apr-19 (Ckms)
Apr-18 to Apr-18 Apr-19 to Apr-19
0 0
6 Transmission Lines Added during Apr-2019 (Ckms)
Apr-18 Apr-19
0 0
763
474
0
100
200
300
400
500
600
700
800
900
All India
Ckm
s
Apr-18 Apr-19
763
474
0
100
200
300
400
500
600
700
800
900
All India
Ckm
s
Apr-18 to Apr-18 Apr-19 to Apr-19
Voltage Level
+- 800 KV HVDC
+- 500 KV HVDC
765 KV
400 KV
220 KV
All India
Voltage Level
+- 800 KV HVDC
+- 500 KV HVDC
765 KV
400 KV
220 KV
All India
6
0 0
All India Transformation Capacity Addition during Apr-18 to Apr-18 amp Apr-19
to Apr-19 (MVA)
4600
0
500
2795
1305
5470
4000
185
1285
0
Apr-18 to Apr-18 Apr-19 to Apr-19
5470
0
500
4600
2795
1305
7 Transformation Capacity Addition During Apr-2019 (MVA)
0
4000
185
1285
0 0
Apr-18 Apr-19
5470
4600
4000
4200
4400
4600
4800
5000
5200
5400
5600
MV
A
Apr-18 Apr-19
5470 4600
0
74520
1
MV
A
Apr-18 to Apr-18 Apr-19 to Apr-19
Apr-2018 Apr-2019 Apr-2018 Apr-2019 Apr-2018 Apr-2019
Northern 28590 30094 28170 29786 -15 -10
Western 33235 34875 33233 34868 00 00
Southern 29211 31111 29166 31109 -02 00
Eastern 11752 12851 11650 12850 -09 00
North Eastern 1225 1300 1174 1228 -42 -55
All India 104013 110231 103393 109842 -06 -04
Apr-2018 Apr-2019 Apr-2018 Apr-2019 Apr-2018 Apr-2019
Northern 48824 54476 48367 53985 -09 -09
Western 50654 56242 50434 56222 -04 00
Southern 45946 49155 45684 49103 -06 -01
Eastern 21320 23349 21275 23349 -02 00
North Eastern 2600 2848 2552 2780 -18 -24
All India 162492 177411 161286 176810 -07 -03
Apr-2019 Figures are Provisional
7
8 Power Supply Position (Energy amp Peak) in Apr-2019
Peak Demand Peak Met
Requirement Availability
Energy (MU)Region
Surplus(+)
Deficit (-) in
Surplus(+)
Deficit (-) in Region
Power (MW)
Chandigarh Delhi Haryana HP JampK Punjab Rajasthan UP Utrakhand Apr-2018 0 0 0 0 546 0 0 247 0
Apr-2019 0 0 0 0 565 0 0 0 0
Chattisgarh Gujarat MP Maharashtra Daman amp Diu Dadar Nagar Goa
Apr-2018 13 11 3 99 0 0 0
Apr-2019 22 6 0 8 1 0 0
AP Telangana Karnataka Kerala Tamil Nadu Puducherry Lakshadweep
Apr-2018 22 0 2 0 0 20 0
Apr-2019 0 0 0 8 0 2 0
8
9 Peak Shortage of Power Supply (MW) in Different Regions in Apr-2019
0 0 0 0
565
0 0 0 00 0 0 0
546
0 0
247
0
0
400
800
Ch
an
dig
ar
h Delh
i
Ha
rya
na
HP
Jamp
K
Pu
nja
b
Ra
jasth
an
UP
Utr
akhan
d
MW
Northern States (MW) Apr-2019 Apr-2018
22
6 0 8 1 0 0
13
11
3
99
0 0 0
0
50
100
150
Ch
attis
gar
h
Guja
rat
MP
Mah
ara
shtr
a
Da
man amp
Diu
Da
dar
Na
gar G
oa
MW
Western States (MW) Apr-2019 Apr-2018
0 0 08
0 2 0
22
0 2 0 0
20
00
50
AP Telangana Karnataka Kerala Tamil Nadu Puducherry Lakshadweep
Southern State (MW) Apr-2019 Apr-2018
Bihar DVC Jharkhand Odisha West Bengal Sikkim AampN Island
Apr-2018 0 39 0 0 7 0 4
Apr-2019 0 0 0 0 0 0 4
Arunachal Assam Manipur Meghalaya Mizoram Nagaland Tripura
Apr-2018 5 30 7 0 9 29 4
Apr-2019 3 45 9 0 3 26 1
9
0 0 0 0 0 0
4
0
39
0 0
7
0
4
01020304050
Bih
ar
DV
C
Jha
rkh
an
d
Od
ish
a
We
st
Be
ng
al
Sik
kim
Aamp
NIs
land
MW
Eastern States (MW) Apr-2019 Apr-2018
3
45
9
0 3
26
1
5 7
0
9
29
4
0
10
20
30
40
50
Aru
na
cha
l
Assa
m
Ma
nip
ur
Me
gh
ala
ya
Miz
ora
m
Na
gala
nd
Trip
ura
MW
North-Eastern States (MW)
Sector Apr-2018 Apr-2019
Central 7634 7459
State 6438 6142
Private Sector IPP 5525 6005
Private Sector UTL 6815 6440
ALL INDIA 6454 6471
Month PLF 2018 PLF 2019
Jan 6215 6054
Feb 6230 6051
March 6452 6340
April 6454 6471
For Coal and Lignite based Power Plants and Provisional based on Actual-Cum-Assesment
10
PLF of Thermal Power Plants
(excluding gas based power plants)
All India PLF of Thermal Plants (Excluding Gas Based Plants) Month-wise
10 All India Thermal PLF Sector-wise (Excluding Gas Based Power Plants) for Apr-2019
5800
6000
6200
6400
6600
Jan Feb March April
Months
All India PLF Month-wise
PLF 2018 PLF 2019
7634
64385525
6815 6454
7459
6142 60056440 6471
000
2000
4000
6000
8000
10000
Central State Private Sector IPP Private Sector UTL ALL INDIA
All India Thermal PLF
Apr-2018 Apr-2019
2012-13 2013-14 2014-15 2015-16 2016-17 2017-18
TampD Losses 2304 2284 2277 2181 2142 2104
ATampC Losses 2548 2262 2572 2398 NA NA
Provisional
Note As per PFC for utilities selling directly to consumers NA- Not Available
Total Number of Villages
597464
Note From the year 2004-05 onwards Definition of Village Electrification-
A village would be declared Electrified if
Without
Subsidy
Gap ACS-
ARR(
Without
Subsidy)
Paiseunit
Gap ACS-
ARR (on
subsidy
booked
basis)
paiseunit
Gap ACS-
ARR (on
subsidyrece
ived basis)
paiseunit
2013-14 400 118 76 77
2014-15 412 108 58 60
Source- PFC Reports on the performance of State Power Utilities
2013-14 4894
2014-15 5304
2015-16 5459
2016-17 5743
2017-18 6080
2018-19 6289
11
11 T amp D and ATampC Losses ()
12 All India Village Electrification
Villiages Electrified (Nos)
10000All villages as per census 2011 has
been electrified on 28042018
Villages electrified
Average cost of supply(ACS)
(paiseunit)
i) Basic Infrastructure such as Distribution Transformer and Distribution lines are provided in the inhabited locality
as well as Dalit Basti hemlet where it exists (For electrification through Non-Conventional Energy Sources a
Distribution Transformer may not be necessary)
14 All India Coal consumption for Power Generation (MT)
520
Average Revenue Realization(paiseunit)
518
Year
ii) Electricity is provided to Public places like Schools Panchayat Office Health Centre Dispensaries Community
Centres etc and
iv) Mandatory Certification from Gram Panchayat regarding the completion of village electrification should be
obtained
13 Average cost of Power amp Average Realisation
iii) The number of households electrified should be at least 10 of the total number of households in the village
SN Contents Page
1 Capacity Addition Targets and Achievements in 12th Plan amp upto March2019 12
2 Capacity Addition Targets amp Achievements during Apr-2019 and Apr-19 to Apr-19 13
3 Installed Capacity in various Regions including their shares 14-19
Section B - Capacity Addition
(i) CAPACITY ADDTION TARGETS AND ACHIEVEMENTS IN THE 12TH PLAN Figures in MW
TARGET ACH TARGET ACH TARGET ACH TARGET ACH
CENTRAL 14878 15869 6004 2584 5300 2000 26182 20453
STATE 13922 22201 1608 2276 0 0 15530 24477
PRIVATE 43540 53661 3285 619 0 0 46825 54280
ALL INDIA 72340 91730 10897 5479 5300 2000 88537 99209
(ii) CAPACITY ADDITION TARGET AND ACHIEVEMENT FOR 2017-18 (IN MW)
THERMAL HYDRO NUCLEAR
TARGET ACH TARGET ACH TARGET ACH TARGET ACH
CENTRAL 4880 3170 800 390 500 6180 3560
STATE 3546 1760 300 200 0 3846 1960
PRIVATE 2940 3780 205 205 0 3145 3985
ALL INDIA 11366 8710 1305 795 500 0 13171 9505
(iii) CAPACITY ADDITION ACHIEVEMENT FOR 2018-19 (IN MW)
TARGET ACH TARGET ACH TARGET ACH TARGET ACH
CENTRAL 2760 1960 710 110 0 0 3470 2070
STATE 4506 2850 130 30 0 0 4636 2880
PRIVATE 0 972 0 0 0 0 0 972
ALL INDIA 7266 5782 840 140 0 0 8106 5922
12
SECTOR
SECTOR
TOTAL
TOTALNUCLEARHYDROTHERMAL
1 Capacity Addtion Targets and Achievements in the 12th Plan amp upto March2019
SECTORTHERMAL HYDRO NUCLEAR TOTAL
(MW)
Cummulative
Deviation
Target Achievement Target Achievement (+) (-)
Central 6040 500 0 500 0 -500
State 425615 660 0 660 0 -660
Private 0 0 0 0 0 0
Total 1029615 1160 0 1160 0 -1160
Central 600 0 0 0 0 0
State 21099 0 0 0 0 0
Private 379 0 0 0 0 0
Total 118999 0 0 0 0 0
Nuclear Central 700 0 0 0 0 0
Central 7340 500 0 500 0 -500
State 446714 660 0 660 0 -660
Private 379 0 0 0 0 0
Total 1218614 1160 0 1160 0 -1160
Electricity Generation (MU) Targets and Achievements for 2016-17
13
Hydro
All India
Capacity Addition TargetsAchievements during the Month of Apr-2019
Thermal
2 Capacity Addition Targets Achievements During Apr-2019
Schemes Sector
Target 2019-20
Apr-19 to Apr-19Apr-19
11
60
0 0
11
60
0 0 0 0
0
200
400
600
800
1000
1200
1400
Thermal Hydro Nuclear Total
MW
Targets and Achievement during 2019-20Target Achievement
0
200
400
600
800
1000
1200
Thermal Hydro Nuclear Total
1160
0 0
1160
0 0 00
MW
Target Achievement
Coal Lignite Gas Diesel Total
State 1634400 25000 287920 000 1947320 000 869755 69956 2887031
Private 2168083 108000 55800 000 2331883 000 251400 1312046 3895329
Central 1233537 25000 234406 000 1492943 162000 849622 37900 2542465
Sub Total 5036020 158000 578126 000 5772146 162000 1970777 1419902 9324825
State 2156000 104000 284982 000 2544982 000 544650 54789 3144421
Private 3474567 50000 467600 000 3992167 000 48100 2186476 6226743
Central 1650295 000 328067 000 1978362 184000 162000 66630 2390992
Sub Total 7280862 154000 1080649 000 8515511 184000 754750 2307894 11762155
State 1993250 000 79198 28788 2101236 000 1177483 58688 3337407
Private 1187450 25000 532210 27370 1772030 000 000 3749140 5521170
Central 1123502 289000 35958 000 1448460 332000 000 54190 1834650
Sub Total 4304202 314000 647366 56158 5321726 332000 1177483 3862018 10693227
State 624000 000 10000 000 634000 000 353792 27511 1015303
Private 638700 000 000 000 638700 000 39900 111637 790237
Central 1483664 000 000 000 1483664 000 100520 1000 1585184
Sub Total 2746364 000 10000 000 2756364 000 494212 140148 3390724
State 000 000 49771 3600 53371 000 42200 23325 118895
Private 000 000 2450 000 2450 000 000 6104 8554
Central 77002 000 125360 000 202362 000 100500 3000 305862
Sub Total 77002 000 177581 3600 258183 000 142700 32429 433311
State 000 000 000 4005 4005 000 000 525 4530
Private 000 000 000 000 000 000 000 738 738
Central 000 000 000 000 000 000 000 510 510
Sub Total 000 000 000 4005 4005 000 000 1773 5778
State 6407650 129000 711871 36393 7284913 000 2987880 234793 10507586
Private 7468800 183000 1058060 27370 8737230 000 339400 7366140 16442770
Central 5568000 314000 723791 000 6605791 678000 1212642 163230 8659663
Total 19444450 626000 2493722 63763 22627934 678000 4539922 7764163 35610019
Figures at decimal may not tally due to rounding off
Note -
(As per latest information available with MNRE)
Break up of RES all India as on 31032019 is given below (in MW)
459315 3562597 2818071 7764163
A 0 MW
B Apr 2019 0 MW
C
Apr 2019 0 MW
D Net Capacity Added during Apr 2019 A-B-C 0 MW
Sector wise breakup of RES capacity as shown is provisional
Share of installed capacity of BBMB Stations is included in state sector of partner states
BM PowerCogen Waste to Energy
910350 13830
Capacity Added during Apr 2019
Capacity Retired during
Capacity removed due to change
from Conventional to RES during
Islands
ALL INDIA
Abbreviation- SHP=Small Hydro Project (le 25 MW) BP=Biomass Power UampI=Urban amp Industrial Waste Power RES=Renewable Energy Sources
1 RES include SHP BP UampI Solar and Wind Energy Installed capacity in respect of RES (MNRE) as on 31032019
Small
Hydro PowerWind Power
Bio-PowerSolar Power
Total
Capacity
RES
(MNRE)
Northern Region
Western Region
Southern Region
Eastern Region
North Eastern
Region
ALL INDIA INSTALLED CAPACITY (IN MW) OF POWER STATIONS
(As on 30042019)
(UTILITIES)
Region Ownership Sector
Mode wise breakup
Grand TotalThermalNuclear Hydro
Coal Lignite Gas Diesel Total
State 13500 000 180040 000 193540 000 000 000 193540
Private 86922 000 10800 000 97722 000 000 17889 115611
Central 311272 000 20701 000 331973 10283 72309 000 414565
Sub-Total 411694 000 211541 000 623235 10283 72309 17889 723716
State 272000 000 15000 000 287000 000 110282 6930 404212
Private 408078 000 000 000 408078 000 20000 34512 462590
Central 129472 000 53561 000 183034 10094 66370181 500 259998
Sub-Total 809550 000 68561 000 878112 10094 196652 41942 1126799
State 000 000 000 000 000 000 69460 25661 95121
Private 000 000 000 000 000 000 99200 62668 161868
Central 18340 000 6201 000 24541 2895 122388 000 149824
Sub-Total 18340 000 6201 000 24541 2895 291048 88329 406813
State 000 000 17500 000 17500 000 123000 12903 153403
Private 000 000 000 000 000 000 000 6483 6483
Central 50639 000 12907 000 63547 6798 109188 000 179533
Sub-Total 50639 000 30407 000 81047 6798 232188 19386 339419
State 176000 000 15000 000 191000 000 259770 12780 463550
Private 511550 000 000 000 511550 000 28800 115462 655812
Central 85458 000 26401 000 111859 19681 92342 000 223882
Sub-Total 773008 000 41401 000 814409 19681 380912 128242 1343244
State 626000 25000 60380 000 711380 000 109618 2385 823383
Private 280200 108000 000 000 388200 000 10400 730181 1128781
Central 95625 25000 22110 000 142735 55674 73901 34400 306710
Sub-Total 1001825 158000 82490 000 1242315 55674 193919 766966 2258874
State 546900 000 000 000 546900 000 72410 2510 621820
Private 871433 000 000 000 871433 000 84200 288760 1244393
Central 379639 000 54949 000 434588 28948 180253 3000 646789
Sub-Total 1797972 000 54949 000 1852921 28948 336863 294270 2513002
State 000 000 000 000 000 000 125215 6787 132002
Private 9900 000 45000 000 54900 000 8800 52620 116320
Central 34324 000 6966 000 41290 3124 47554 000 91968
Sub-Total 44224 000 51966 000 96190 3124 181569 59407 340290
State 000 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 000 3471 3471
Central 3815 000 1503 000 5317 801 10171 000 16289
Sub-Total 3815 000 1503 000 5317 801 10171 3471 19760
124953 000 29105 000 154058 23703 75145 000 252907
State 1634400 25000 287920 000 1947320 000 869755 69956 2887031
Private 2168083 108000 55800 000 2331883 000 251400 1312046 3895329
Central 1233537 25000 234406 000 1492943 162000 849622 37900 2542465
Grand Total 5036020 158000 578126 000 5772146 162000 1970777 1419902 9324825
Delhi
Haryana
Himachal Pradesh
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
NORTHERN REGION
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
(As on 30042019)
State Ownership Sector
Mode wise breakup
Grand TotalThermalNuclear Hydro
RES
(MNRE)
Jammu amp Kashmir
Punjab
Rajasthan
Uttar Pradesh
Uttarakhand
Chandigarh
Central - Unallocated
Total (Northern
Region)
(As on 30042019)
Coal Lignite Gas Diesel Total
State 000 000 000 000 000 000 000 005 005
Private 000 000 4800 000 4800 000 000 392 5192
Central 46959 000 1967 000 48926 2600 000 000 51526
Sub-Total 46959 000 6767 000 53726 2600 000 397 56723
State 000 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 000 1447 1447
Central 14141 000 4334 000 18475 700 000 000 19175
Sub-Total 14141 000 4334 000 18475 700 000 1447 20622
State 371000 104000 217782 000 692782 000 77200 6470 776452
Private 726567 50000 396000 000 1172567 000 000 833180 2005747
Central 324243 000 42400 000 366643 55900 000 24330 446873
Sub-Total 1421810 154000 656182 000 2231992 55900 77200 863980 3229072
State 540000 000 000 000 540000 000 170366 8396 718762
Private 617400 000 10000 000 627400 000 000 418040 1045440
Central 334238 000 25700 000 359938 27300 152000 30000 569238
Sub-Total 1491638 000 35700 000 1527338 27300 322366 456436 2333440
State 228000 000 000 000 228000 000 12000 1105 241105
Private 885000 000 000 000 885000 000 000 52430 937430
Central 211075 000 000 000 211075 4800 10000 000 225875
Sub-Total 1324075 000 000 000 1324075 4800 22000 53535 1404410
State 1017000 000 67200 000 1084200 000 285084 38813 1408097
Private 1245600 000 56800 000 1302400 000 48100 880441 2230941
Central 466780 000 227273 000 694053 69000 000 12300 775353
Sub-Total 2729380 000 351273 000 3080653 69000 333184 931553 4414390
State 000 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 000 546 546
Central 19560 000 6634 000 26194 900 000 000 27094
Sub-Total 19560 000 6634 000 26194 900 000 546 27640
233300 000 19759 000 253059 22800 000 000 275859
State 2156000 104000 284982 000 2544982 000 544650 54789 3144421
Private 3474567 50000 467600 000 3992167 000 48100 2186476 6226743
Central 1650295 000 328067 000 1978362 184000 162000 66630 2390992
Grand Total 7280862 154000 1080649 000 8515511 184000 754750 2307894 11762155
Goa
Daman amp Diu
Gujarat
Madhya Pradesh
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
WESTERN REGION
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
ThermalNuclear Hydro
RES
(MNRE)
State Ownership Sector
Mode wise breakup
Grand Total
Chhattisgarh
Maharashtra
Dadra amp Nagar
Naveli
Central - Unallocated
Total (Western
Region)
(As on 30042019)
Coal Lignite Gas Diesel Total
State 501000 000 23540 000 524540 000 167360 5618 697518
Private 387388 000 381318 3680 772386 000 000 743342 1515728
Central 154683 12773 000 000 167456 12727 000 25000 205183
Sub-Total 1043071 12773 404858 3680 1464382 12727 167360 773960 2418429
State 558250 000 000 000 558250 000 247993 4122 810365
Private 83945 000 83182 000 167127 000 000 393644 560771
Central 180685 14927 000 000 195612 14873 000 1000 211485
Sub-Total 822880 14927 83182 000 920989 14873 247993 398766 1582621
State 502000 000 000 12792 514792 000 358660 19389 892841
Private 195850 000 000 2520 198370 000 000 1363591 1561961
Central 242780 40140 000 000 282920 69800 000 000 352720
Sub-Total 940630 40140 000 15312 996082 69800 358660 1382979 2807521
State 000 000 000 15996 15996 000 185650 17290 218936
Private 61500 000 17400 000 78900 000 000 19021 97921
Central 86142 28180 35958 000 150280 36200 000 5000 191480
Sub-Total 147642 28180 53358 15996 245176 36200 185650 41311 508337
State 432000 000 52408 000 484408 000 217820 12270 714498
Private 458767 25000 50310 21170 555247 000 000 1229228 1784475
Central 302532 136420 000 000 438952 144800 000 23190 606942
Sub-Total 1193299 161420 102718 21170 1478607 144800 217820 1264688 3105915
State 000 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 000 000 000
Central 000 10000 000 000 10000 000 000 000 10000
Sub-Total 000 10000 000 000 10000 000 000 000 10000
State 000 000 3250 000 3250 000 000 000 3250
Private 000 000 000 000 000 000 000 314 314
Central 14080 10760 000 000 24840 8600 000 000 33440
Sub-Total 14080 10760 3250 000 28090 8600 000 314 37004
142600 35800 000 000 178400 45000 000 000 223400
State 1993250 000 79198 28788 2101236 000 1177483 58688 3337407
Private 1187450 25000 532210 27370 1772030 000 000 3749140 5521170
Central 1123502 289000 35958 000 1448460 332000 000 54190 1834650
Grand Total 4304202 314000 647366 56158 5321726 332000 1177483 3862018 10693227
Kerala
Andhra Pradesh
Telangana
Karnataka
Total (Southern
Region)
Tamil Nadu
NLC
Puducherry
Central - Unallocated
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
SOUTHERN REGION
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
State Ownership Sector
Mode wise breakup
Grand TotalThermalNuclear Hydro
RES
(MNRE)
(As on 30042019)
Coal Lignite Gas Diesel Total
State 000 000 000 000 000 000 000 7070 7070
Private 28100 000 000 000 28100 000 000 25545 53645
Central 384933 000 000 000 384933 000 11000 000 395932
Sub-Total 413033 000 000 000 413033 000 11000 32615 456647
State 42000 000 000 000 42000 000 13000 405 55405
Private 73000 000 000 000 73000 000 000 3495 76495
Central 39374 000 000 000 39374 000 6100 000 45474
Sub-Total 154374 000 000 000 154374 000 19100 3900 177374
State 540000 000 10000 000 550000 000 98600 12195 660795
Private 243700 000 000 000 243700 000 000 35250 278950
Central 76077 000 000 000 76077 000 41000 000 117077
Sub-Total 859777 000 10000 000 869777 000 139600 47445 1056822
State 000 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 000 000 000
Central 698504 000 000 000 698504 000 18620 000 717124
Sub-Total 698504 000 000 000 698504 000 18620 000 717124
State 42000 000 000 000 42000 000 206192 2630 250822
Private 293900 000 000 000 293900 000 000 47346 341246
Central 163390 000 000 000 163390 000 8900 1000 173290
Sub-Total 499290 000 000 000 499290 000 215092 50976 765358
State 000 000 000 000 000 000 36000 5211 41211
Private 000 000 000 000 000 000 39900 001 39901
Central 8703 000 000 000 8703 000 6400 000 15103
Sub-Total 8703 000 000 000 8703 000 82300 5212 96215
112683 000 000 000 112683 000 8501 000 121184
State 624000 000 10000 000 634000 000 353792 27511 1015303
Private 638700 000 000 000 638700 000 39900 111637 790237
Central 1483664 000 000 000 1483664 000 100520 1000 1585184
Grand Total 2746364 000 10000 000 2756364 000 494212 140148 3390724
Total (Eastern
Region)
Bihar
Jharkhand
West Bengal
DVC
Odisha
Sikkim
Central - Unallocated
HydroOwnership Sector
Mode wise breakup
Grand TotalThermalNuclear
RES
(MNRE)
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
State
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
EASTERN REGION
(As on 30042019)
Coal Lignite Gas Diesel Total
State 000 000 32821 000 32821 000 10000 501 43322
Private 000 000 2450 000 2450 000 000 2650 5100
Central 40852 000 43556 000 84408 000 35708 2500 122616
Sub-Total 40852 000 78827 000 119679 000 45708 5651 171038
State 000 000 000 000 000 000 000 10711 10711
Private 000 000 000 000 000 000 000 2939 2939
Central 3705 000 4682 000 8387 000 11655 000 20042
Sub-Total 3705 000 4682 000 8387 000 11655 13650 33692
State 000 000 000 000 000 000 32200 3253 35453
Private 000 000 000 000 000 000 000 012 012
Central 4560 000 10969 000 15529 000 7227 000 22756
Sub-Total 4560 000 10969 000 15529 000 39427 3265 58221
State 000 000 16950 000 16950 000 000 1601 18551
Private 000 000 000 000 000 000 000 009 009
Central 5610 000 43695 000 49305 000 6849 500 56654
Sub-Total 5610 000 60645 000 66255 000 6849 2110 75214
State 000 000 000 3600 3600 000 000 545 4145
Private 000 000 000 000 000 000 000 344 344
Central 4710 000 7157 000 11867 000 9534 000 21401
Sub-Total 4710 000 7157 3600 15467 000 9534 889 25890
State 000 000 000 000 000 000 000 3067 3067
Private 000 000 000 000 000 000 000 100 100
Central 3210 000 4893 000 8103 000 5733 000 13836
Sub-Total 3210 000 4893 000 8103 000 5733 3167 17003
State 000 000 000 000 000 000 000 3647 3647
Private 000 000 000 000 000 000 000 050 050
Central 3105 000 4046 000 7151 000 9794 000 16945
Sub-Total 3105 000 4046 000 7151 000 9794 3697 20642
11250 000 6362 000 17612 000 14000 000 31612
State 000 000 49771 3600 53371 000 42200 23325 118895
Private 000 000 2450 000 2450 000 000 6104 8554
Central 77002 000 125360 000 202362 000 100500 3000 305862
Grand Total 77002 000 177581 3600 258183 000 142700 32429 433311
Assam
Arunachal Pradesh
Meghalaya
Tripura
Manipur
Nagaland
Mizoram
Central - Unallocated
Total (North-
Eastern Region)
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
NORTH-EASTERN REGION
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
State Ownership Sector
Mode wise breakup
Grand TotalThermalNuclear Hydro
RES
(MNRE)
(As on 30042019)
Coal Lignite Gas Diesel Total
State 000 000 000 4005 4005 000 000 525 4530
Private 000 000 000 000 000 000 000 663 663
Central 000 000 000 000 000 000 000 510 510
Sub-Total 000 000 000 4005 4005 000 000 1698 5703
State 000 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 000 075 075
Central 000 000 000 000 000 000 000 000 000
Sub-Total 000 000 000 000 000 000 000 075 075
State 000 000 000 4005 4005 000 000 525 4530
Private 000 000 000 000 000 000 000 738 738
Central 000 000 000 000 000 000 000 510 510
Grand Total 000 000 000 4005 4005 000 000 1773 5778
Andaman amp
Nicobar
Lakshadweep
Total (Islands)
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
ISLANDS
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
State Ownership Sector
Mode wise breakup
Grand TotalThermalNuclear Hydro
RES
(MNRE)
SrNo Contents Page
1 Executive summary of Target and Achievement of Transmission Lines during 2019-20
20(1)
2 List of Transmission Lines CommissionedReady for commissioning during Apr-2019 20(2)
Section C - Transmission Lines
1 Executive summary of Target and Achievement of Transmission Lines during 2019-20 As on 30-04-19
(All figures in circuit kms)
Ce
ntr
al S
ecto
r
Sta
te S
ecto
r
JV
Pri
va
te S
ecto
r
To
tal
Ce
ntr
al S
ecto
r
Sta
te S
ecto
r
JV
Pri
va
te S
ecto
r
To
tal
Ce
ntr
al S
ecto
r
Sta
te S
ecto
r
JV
Pri
va
te S
ecto
r
To
tal
Ce
ntr
al S
ecto
r
Sta
te S
ecto
r
JV
Pri
va
te S
ecto
r
To
tal
Ce
ntr
al S
ecto
r
Sta
te S
ecto
r
JV
Pri
va
te S
ecto
r
To
tal
Ce
ntr
al
Se
cto
r
Sta
te S
ec
tor
JV
Pri
va
te S
ec
tor
Gra
nd
To
tal
0 0 0 0 0 0 0 0 2727 958 2334 6019 2239 3416 1143 6798 781 10023 0 10804 5747 14397 3477 23621
Apr19 Programme 0 0 0 0 0 0 0 0 577 416 557 1550 60 890 203 1153 0 309 0 309 637 1615 760 3012
Achievement 0 0 0 0 0 0 0 0 53 0 0 53 0 20 0 20 0 401 0 401 53 421 0 474
Upto Apr-19 Programme 0 0 0 0 0 0 0 0 577 416 557 1550 60 890 203 1153 0 309 0 309 637 1615 760 3012
Achievement 0 0 0 0 0 0 0 0 53 0 0 53 0 20 0 20 0 401 0 401 53 421 0 474
20(1)
220 kV Grand Total 800 kV 500 kV
Programme 2019-20
Programme
Achievement
HVDC765 kV 400 kV
Line
1 2 3 4 5 6
1 400 Bhadla (PG) - Bhadla (RVPN) line DC PGCIL 53
53
2 400 LILO of one ckt Jhanor - Navsari at Vav Ss DC GETCO 20
3 220 Banda-Chitrakoot Line DC UPPTCL 226
4 220 Gorakhpur (PG)-Gola line DC UPPTCL 82
5 220 Hapur(765) - Faridnagar line SC UPPTCL 11
6 220 Kalikiri - Madanapalli line DC APTRANSCO 60
7 220LILO of Gr Noida -Noida Sec-129 at Noida
Sec-148DC UPPTCL 1
8 220LILO of one Ckt of Badshahpur Pali at Sec-
65 GurgaonDC HVPNL 3
9 220 Sultanpur-Sangipur LILO Section at Amethi DC UPPTCL 18
421
0
474
20(2)
Grand Total
2Transmission Lines (220 kV and above) CommissionedReady for commissioning During Apr-2019
Voltage
Level (kV)Name of Transmission Lines
Circuit
Type
Executing
Agency
CENTRAL SECTOR
Total of CENTRAL SECTOR
STATE SECTOR Sector
Total of STATE SECTOR
PRIVATE SECTOR
Total of PRIVATE SECTOR
SlNo
Length(CKm)
As on 30-04-19
SN Contents Page
1 Executive summary of Target and Achievement of Substations during 2019-20 21(1)
2Sub Stations (220 kV and above) commissionedready for commisssioning during Apr-
201921(2)
Section D - Sub Stations
1 Executive summary of Target and Achievement of Substations during 2019-2020 As on 30-04-19
(All figures in circuit MVA)
Ce
ntr
al S
ecto
r
Sta
te S
ecto
r
JV
Pri
va
te S
ecto
r
To
tal
Ce
ntr
al S
ecto
r
Sta
te S
ecto
r
JV
Pri
va
te S
ecto
r
To
tal
Ce
ntr
al S
ecto
r
Sta
te S
ecto
r
JV
Pri
va
te S
ecto
r
To
tal
Ce
ntr
al S
ecto
r
Sta
te S
ecto
r
JV
Pri
va
te S
ecto
r
To
tal
Ce
ntr
al S
ecto
r
Sta
te S
ecto
r
JV
Pri
va
te S
ecto
r
To
tal
Ce
ntr
al S
ec
tor
Sta
te S
ec
tor
JV
Pri
va
te S
ec
tor
Gra
nd
To
tal
3000 0 0 3000 0 0 0 0 18000 3000 6000 27000 5205 19665 4260 29130 800 21786 0 22586 27005 44451 10260 81716
Apr19 Programme 0 0 0 0 0 0 0 0 3000 0 3000 6000 0 1000 2000 3000 0 800 0 800 3000 1800 5000 9800
Achievement 0 0 0 0 0 0 0 0 500 0 0 500 815 1980 0 2795 0 1305 0 1305 1315 3285 0 4600
Upto Apr-19 Programme 0 0 0 0 0 0 0 0 3000 0 3000 6000 0 1000 2000 3000 0 800 0 800 3000 1800 5000 9800
Achievement 0 0 0 0 0 0 0 0 500 0 0 500 815 1980 0 2795 0 1305 0 1305 1315 3285 0 4600
21(1)
220 kV Grand Total 800 kV 500 kV
Programme 2019-20
Programme
Achievement
HVDC765 kV 400 kV
As on 30-04-19
Sl Voltage Ratio Capacity
No (kVkV) (MWMVA)
1 2 3 4 5
1 Bhadla SS (3x1500 3x500 MVA) 765400 PGCIL 500
2 Extn at Tumkur (Pavagada ) PS (2x500 MVA) 400220 PGCIL 500
3 Bongaigaon (2nd ICT) Ss 400220 PGCIL 315
Total of CENTRAL SECTOR 1315
4 Motiram Adda Gorakhpur (Aug) (Additional TF) 400220 UPPTCL 240
5 Muradnagar-II Ghaziabad (Aug) (Additional TF) 400220 UPPTCL 240
6 Noida Sec- 148 GBNagar (New) 400220 UPPTCL 5007 Sarnath Varanasi (Aug) TF- II (500-315) 400220 UPPTCL 1858 Sarojininagar Lucknow Aug) TF- II (500-315) 400220 UPPTCL 185
9 Unnao (Aug) TF-III 400220 UPPTCL 31510 Nawada SS 400220 HVPNL 31511 Kharepatan SS 22033 MSETCL 2512 Prathipadu SS 220132 APTRANSCO 10013 Pali Ss 22066 HVPNL 160
14 A-5 Faridabad Ss 22066 HVPNL 60
15 Rentachintala Ss Aug(3X100-2x100) 220132 APTRANSCO 10016 Amethi Ss 220132 UPPTCL 160
17 Gajokhar Varanasi (Aug) TF- II (160-100) 220132 UPPTCL 60
18 Gola Gorakhpur (New) 220132 UPPTCL 160
19 Khurja Bulandshahr (Aug) TF- II (200-160) 220132 UPPTCL 40
20 RC Green GB Nagar (Aug) TF-II (160-100) 220132 UPPTCL 60
21 Sikandrabad Bulandshahr (Aug) (Additional TF) 220132 UPPTCL 160
22 Sitapur (Aug) (Additional TF) 220132 UPPTCL 160
23 Sohawal Ayodhya (Aug) TF-II (160-100) 220132 UPPTCL 60
TOTAL STATE SECTOR 3285
GRAND TOTAL 4600
21(2)
CENTRAL SECTOR
STATE SECTOR
2Sub-Stations (220 kV and above) CommissionedReady for commissioning During Apr-2019
Name of Sub Stations Executing Agency
SN Contents Page
1 Electricity Generation (MU) Targets and Achievements for 2019-20 22
Section E - Electricity Generation
Programme Achievement Ach Programme Achievement Ach
Central Sector 37545100 3177900 3129530 9848 3177900 3129530 9848
State Sector 37498600 3322500 2950558 8881 3322500 2950558 8881
PvtIPP Sector 37346200 3236400 3195940 9875 3236400 3195940 9875
PvtUTL Sector 1823100 159300 165579 10394 159300 165579 10394
Total 114213000 9896100 9441607 9541 9896100 9441607 9541
Central Sector 5661700 386100 481390 12468 386100 481390 12468
State Sector 6680500 498200 536514 10769 498200 536514 10769
PvtIPP Sector 1206900 57300 80405 14032 57300 80405 14032
PvtUTL Sector 144100 12300 10930 8886 12300 10930 8886
Total 13693200 953900 1109239 11628 953900 1109239 11628
Central Sector 4472000 367300 317765 8651 367300 317765 8651
Total 4472000 367300 317765 8651 367300 317765 8651
Bhutan Import 621800 17500 24396 13941 17500 24396 13941
Central Sector 47678800 3931300 3928685 9993 3931300 3928685 9993
State Sector 44179100 3820700 3487072 9127 3820700 3487072 9127
Pvt Sector 40520300 3465300 3452854 9964 3465300 3452854 9964
Total 133000000 11234800 10893007 9696 11234800 10893007 9696
Provisional based on actual-cum-Assesment
Figs in MU
Cummulative
Achievement
Cummulative
Achievement
Mar-19 Mar-18 Upto Mar-2019 Upto Mar-2018
984785 869291 12675910 10183949
22
1 Electricity Generation (MU) Targets and Achievememts for 2019-20
All India Energy Generation During Apr-19 to Apr-19 (MU)
Target (2019-20)Apr-19 to Apr-19
Sector
Hydro
Thermal
Nuclear
Renewable Energy Generation
Achievement
Apr-2019
98961
95393673
112348
94416
11092
3178
108930
0
20000
40000
60000
80000
100000
120000
Thermal Hydro Nuclear Total
Programme
Achievement
SN Contents Page
1 Energy Power Supply Position (Provisional) for Apr-2019 and during Apr-19 to Apr-19 23
2 Peak Power Supply Position (Provisional) for Apr-2019 and during Apr-19 to Apr-19 24
3 Energy Power Supply Position (Revised) for Mar-2019 and during Apr-19 to Mar-19 25
4 Peak Power Supply Position (Revised) for Mar-2019 and during Apr-19 to Mar-19 26
5 Notified Power cuts Restrictions on Industries during Apr-2019 27
6 Power Supply to Agricultural Sector during Apr-2019 28
Section F - Power supply position
आकड़ मममलयन यननट नट Figures in MU net
ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied
कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )
चडीगढ़ Chandigarh 117 117 0 00 117 117 0 00
दिलली Delhi 2698 2698 1 00 2698 2698 1 00
हरियजणज Haryana 3773 3773 0 00 3773 3773 0 00
दहमजचल परिश Himachal Pradesh 777 777 0 00 777 777 0 00
रमम कशमीि Jammu amp Kashmir 1604 1296 308 192 1604 1296 308 192
परजब Punjab 3646 3646 0 00 3646 3646 0 00
िजरसथजन Rajasthan 6210 6208 2 00 6210 6208 2 00
उतति परिश Uttar Pradesh 10179 10148 32 03 10179 10148 32 03
उततिजखड Uttarakhand 1120 1120 0 00 1120 1120 0 00
उततरी कषतर Northern Region 30094 29786 308 10 30094 29786 308 10
छततीसगढ़ Chhattisgarh 2684 2676 8 03 2684 2676 8 03
गरिजत Gujarat 10718 10718 0 00 10718 10718 0 00
मधय परिश Madhya Pradesh 6006 6006 0 00 6006 6006 0 00
महजिजषटर Maharashtra 14308 14308 0 00 14308 14308 0 00
िमन औि दिउ Daman amp Diu 220 220 0 00 220 220 0 00
िजिि व नगि हवली Dadra amp Nagar Haveli 552 552 0 00 552 552 0 00
गोवज Goa 388 388 0 00 388 388 0 00
पशचिमी कषतर Western Region 34875 34868 8 00 34875 34868 8 00
आनधर परिश Andhra Pradesh 5708 5708 0 00 5708 5708 0 00
तलगजनज Telangana 5725 5725 0 00 5725 5725 0 00
कनजाटक Karnataka 7003 7003 0 00 7003 7003 0 00
किल Kerala 2402 2400 2 01 2402 2400 2 01
तममल नजड Tamil Nadu 10010 10010 0 00 10010 10010 0 00
पडचिी Puducherry 263 263 0 00 263 263 0 00
लकष-दवीप Lakshadweep 4 4 0 0 4 4 0 0
दकषकषणी कषतर Southern Region 31111 31109 2 00 31111 31109 2 00
बबहजि Bihar 2589 2589 0 00 2589 2589 0 00
िजमोिि घजटी ननगम DVC 1772 1772 0 00 1772 1772 0 00
झजिखणड Jharkhand 689 689 0 00 689 689 0 00
ओडडशज Odisha 2689 2689 1 00 2689 2689 1 00
पशशचम बगजल West Bengal 5075 5075 0 00 5075 5075 0 00
मसशककम Sikkim 37 37 0 00 37 37 0 00
अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 7 29 27 2 7
परवी कषतर Eastern Region 12851 12850 1 00 12851 12850 1 00
अरणजचल परिश Arunachal Pradesh 66 66 0 05 66 66 0 05
असम Assam 766 709 57 75 766 709 57 75
मणणपि Manipur 68 67 1 15 68 67 1 15
मघजलय Meghalaya 170 160 10 59 170 160 10 59
ममज़ोिम Mizoram 54 53 0 08 54 53 0 08
नजगजलड Nagaland 54 54 0 08 54 54 0 08
बिपिज Tripura 122 120 1 12 122 120 1 12
उततर-परवी कषतर North-Eastern Region 1300 1228 71 55 1300 1228 71 55
समपणण भारत All India 110231 109842 389 04 110231 109842 389 04
23
ऊरजा पनत ा म कमी ऊरजा पनत ा म कमीEnergy not Supplied
Excludes energy exported to Bangladesh
Energy not Supplied
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
ऊराण वरवदयत आपरत ण शथिरत ररपोरण (परवाणरवलोकन) Energy Power Supply Position Report (Provisional)
राजयState
अपरल 2019 April2019 अपरल2019 -अपरल2019 April2019 to April2019
अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met
कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )
चडीगढ़ Chandigarh 256 256 0 00 256 256 0 00
दिलली Delhi 5664 5664 0 00 5664 5664 0 00
हरियजणज Haryana 8127 8127 0 00 8127 8127 0 00
दहमजचल परिश Himachal Pradesh 1387 1387 0 00 1387 1387 0 00
रमम कशमीि Jammu amp Kashmir 2826 2261 565 200 2826 2261 565 200
परजब Punjab 7015 7015 0 00 7015 7015 0 00
िजरसथजन Rajasthan 10560 10560 0 00 10560 10560 0 00
उतति परिश Uttar Pradesh 19935 19935 0 00 19935 19935 0 00
उततिजखड Uttarakhand 1922 1922 0 00 1922 1922 0 00
उततरी कषतर Northern Region 54476 53985 491 09 54476 53985 491 09
छततीसगढ़ Chhattisgarh 4596 4574 22 05 4596 4574 22 05
गरिजत Gujarat 17871 17865 6 00 17871 17865 6 00
मधय परिश Madhya Pradesh 10018 10018 0 00 10018 10018 0 00
महजिजषटर Maharashtra 23158 23150 8 00 23158 23150 8 00
िमन औि दिउ Daman amp Diu 341 340 1 02 341 340 1 02
िजिि व नगि हवली Dadra amp Nagar Haveli 818 818 0 00 818 818 0 00
गोवज Goa 594 594 0 00 594 594 0 00
पशचिमी कषतर Western Region 56242 56222 20 00 56242 56222 20 00
आनधर परिश Andhra Pradesh 9151 9151 0 00 9151 9151 0 00
तलगजनज Telangana 10191 10191 0 00 10191 10191 0 00
कनजाटक Karnataka 12681 12681 0 00 12681 12681 0 00
किल Kerala 4309 4300 8 02 4309 4300 8 02
तममल नजड Tamil Nadu 15972 15972 0 00 15972 15972 0 00
पडचिी Puducherry 482 480 2 05 482 480 2 05
लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0
दकषकषणी कषतर Southern Region 49155 49103 52 01 49155 49103 52 01
बबहजि Bihar 5357 5357 0 00 5357 5357 0 00
िजमोिि घजटी ननगम DVC 3039 3039 0 00 3039 3039 0 00
झजिखणड Jharkhand 1266 1266 0 00 1266 1266 0 00
ओडडशज Odisha 5389 5389 0 00 5389 5389 0 00
पशशचम बगजल West Bengal 8666 8666 0 00 8666 8666 0 00
मसशककम Sikkim 100 100 0 00 100 100 0 00
अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7
परवी कषतर Eastern Region 23349 23349 0 00 23349 23349 0 00
अरणजचल परिश Arunachal Pradesh 139 136 3 22 139 136 3 22
असम Assam 1712 1667 45 26 1712 1667 45 26
मणणपि Manipur 197 188 9 46 197 188 9 46
मघजलय Meghalaya 336 336 0 00 336 336 0 00
ममज़ोिम Mizoram 116 113 3 26 116 113 3 26
नजगजलड Nagaland 157 131 26 166 157 131 26 166
बिपिज Tripura 292 291 1 03 292 291 1 03
उततर-परवी कषतर North-Eastern Region 2848 2780 68 24 2848 2780 68 24
समपणण भारत All India 177411 176810 601 03 177411 176810 601 03
24
मजग की पनत ा म कमी Demand not Met
Excludes the supply to Bangladesh
राजयStateअपरल 2019 April2019
मजग की पनत ा म कमी Demand not Met
अधिकतम वरवदयत आपरत ण शथिरत ररपोरण (परवाणरवलोकन) Peak Power Supply Position Report (Provisional)
आकड़ मगज वजट नट Figures in MW netअपरल2019 -अपरल2019 April2019 to April2019
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
आकड़ मममलयन यननट नट Figures in MU net
ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied
कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )
चडीगढ़ Chandigarh 96 96 0 00 1561 1561 0 00
दिलली Delhi 1931 1930 1 00 32299 32282 17 01
हरियजणज Haryana 3658 3658 0 00 53665 53665 0 00
दहमजचल परिश Himachal Pradesh 832 830 2 02 9850 9618 232 24
रमम कशमीि Jammu amp Kashmir 1767 1414 353 200 19593 15868 3725 190
परजब Punjab 3585 3585 0 00 55288 55275 13 00
िजरसथजन Rajasthan 6774 6770 4 01 79826 79637 189 02
उतति परिश Uttar Pradesh 8754 8691 63 07 117101 116118 984 08
उततिजखड Uttarakhand 1067 1067 0 00 13845 13753 92 07
उततरी कषतर Northern Region 28464 28041 423 15 383028 377776 5251 14
छततीसगढ़ Chhattisgarh 2464 2457 8 03 26130 26076 54 02
गरिजत Gujarat 9890 9890 0 00 116588 116572 15 00
मधय परिश Madhya Pradesh 6236 6236 0 00 75667 75665 2 00
महजिजषटर Maharashtra 13631 13631 0 00 158285 158148 137 01
िमन औि दिउ Daman amp Diu 221 221 0 00 2557 2557 0 00
िजिि व नगि हवली Dadra amp Nagar Haveli 553 553 0 00 6317 6317 0 00
गोवज Goa 362 362 0 00 4283 4280 3 01
पशचिमी कषतर Western Region 33357 33349 8 00 389827 389615 212 01
आनधर परिश Andhra Pradesh 6072 6071 1 00 63735 63677 58 01
तलगजनज Telangana 6930 6929 1 00 66697 66635 62 01
कनजाटक Karnataka 7614 7612 1 00 71759 71690 69 01
किल Kerala 2489 2488 1 00 25029 24911 118 05
तममल नजड Tamil Nadu 10247 10245 2 00 109375 109273 102 01
पडचिी Puducherry 252 251 1 04 2761 2751 10 03
लकष-दवीप Lakshadweep 4 4 0 0 46 46 0 0
दकषकषणी कषतर Southern Region 33605 33597 8 00 339355 338938 417 01
बबहजि Bihar 2319 2318 1 00 30052 29827 225 07
िजमोिि घजटी ननगम DVC 1773 1772 1 00 22365 21995 369 17
झजिखणड Jharkhand 698 697 1 01 8682 8461 221 25
ओडडशज Odisha 2583 2582 1 00 31810 31781 30 01
पशशचम बगजल West Bengal 4585 4584 2 00 52237 52078 159 03
मसशककम Sikkim 41 41 0 00 513 512 0 01
अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 67 346 323 23 67
परवी कषतर Eastern Region 11999 11995 5 00 145658 144654 1004 07
अरणजचल परिश Arunachal Pradesh 61 60 0 06 864 855 9 10
असम Assam 680 656 23 34 9532 9204 328 34
मणणपि Manipur 68 68 1 09 916 906 10 11
मघजलय Meghalaya 173 173 0 03 1955 1953 1 01
ममज़ोिम Mizoram 50 49 0 09 668 661 8 12
नजगजलड Nagaland 58 57 1 20 902 809 93 103
बिपिज Tripura 150 150 0 00 1859 1837 21 11
उततर-परवी कषतर North-Eastern Region 1240 1214 26 21 16696 16225 471 28
समपणण भारत All India 108665 108196 469 04 1274564 1267209 7355 06
Note The revised data for March 2019 is not avaliable
Excludes energy exported to Bangladesh
राजयState
ऊराण वरवदयत आपरत ण शथिरत ररपोरण (परवाणरवलोकन) Energy Power Supply Position Report (Provisional)
25
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
Energy not Supplied Energy not Supplied
मािण2019 March2019 अपरल2018 -मािण2019 April2018 to March2019
ऊरजा पनत ा म कमी ऊरजा पनत ा म कमी
अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met
कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )
चडीगढ़ Chandigarh 223 223 0 00 369 369 0 00
दिलली Delhi 4016 4016 0 00 7016 7016 0 00
हरियजणज Haryana 6544 6544 0 00 10270 10270 0 00
दहमजचल परिश Himachal Pradesh 1683 1683 0 00 1700 1700 0 00
रमम कशमीि Jammu amp Kashmir 3277 2622 655 200 3277 2622 655 200
परजब Punjab 6564 6564 0 00 12638 12638 0 00
िजरसथजन Rajasthan 11885 11885 0 00 13276 13276 0 00
उतति परिश Uttar Pradesh 16220 16220 0 00 20498 20062 436 21
उततिजखड Uttarakhand 2002 2002 0 00 2216 2216 0 00
उततरी कषतर Northern Region 47925 47356 569 12 63166 61726 1440 23
छततीसगढ़ Chhattisgarh 4444 4128 316 71 4444 4270 174 39
गरिजत Gujarat 16263 16263 0 00 17053 16963 90 05
मधय परिश Madhya Pradesh 12328 12323 5 00 13815 13815 0 00
महजिजषटर Maharashtra 22361 22291 70 03 23864 23254 610 26
िमन औि दिउ Daman amp Diu 336 336 0 01 357 356 1 02
िजिि व नगि हवली Dadra amp Nagar Haveli 800 799 1 01 816 815 1 01
गोवज Goa 538 538 0 00 596 596 0 00
पशचिमी कषतर Western Region 53132 52965 167 03 56675 55821 853 15
आनधर परिश Andhra Pradesh 8977 8977 0 00 9459 9453 6 01
तलगजनज Telangana 10471 10471 0 00 10815 10815 0 00
कनजाटक Karnataka 12841 12841 0 00 12841 12841 0 00
किल Kerala 4264 4228 36 09 4264 4228 36 09
तममल नजड Tamil Nadu 15712 15712 0 00 15712 15712 0 00
पडचिी Puducherry 427 412 15 34 427 412 15 34
लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0
दकषकषणी कषतर Southern Region 49464 49464 0 00 49464 49464 0 00
बबहजि Bihar 4633 4633 0 00 5115 5084 31 06
िजमोिि घजटी ननगम DVC 3035 3035 0 00 3035 3035 0 00
झजिखणड Jharkhand 1210 1210 0 00 1339 1291 48 36
ओडडशज Odisha 4827 4827 0 00 5357 5357 0 00
पशशचम बगजल West Bengal 8287 8287 0 00 9130 9123 7 01
मसशककम Sikkim 100 100 0 00 106 106 0 00
अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7
परवी कषतर Eastern Region 21658 21658 0 00 23141 22733 408 18
अरणजचल परिश Arunachal Pradesh 133 131 2 15 138 138 0 01
असम Assam 1539 1508 31 20 1865 1809 56 30
मणणपि Manipur 204 199 5 25 219 216 3 12
मघजलय Meghalaya 357 357 0 00 374 372 1 04
ममज़ोिम Mizoram 108 105 3 28 121 119 2 17
नजगजलड Nagaland 127 125 2 16 156 138 18 116
बिपिज Tripura 249 249 0 00 298 293 5 17
उततर-परवी कषतर North-Eastern Region 2540 2535 5 02 2967 2850 117 39
समपणण भारत All India 169464 168745 719 04 177022 175528 1494 08
Note The revised data for March 2019 is not avaliable 26
अधिकतम वरवदयत आपरत ण शथिरत ररपोरण (परवाणरवलोकन) Peak Power Supply Position Report (Provisional)
आकड़ मगज वजट नट Figures in MW net
राजयStateमािण2019 March2019 अपरल2018 -मािण2019 April2018 to March2019
मजग की पनत ा म कमी मजग की पनत ा म कमी Demand not MetDemand not Met
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
Excludes the supply to Bangladesh
अपरल 2019 April2019 अपरल2018 -मािण2019 April2019 to April2019
उततरी कषतर Northern Region
चडीगढ़ Chandigarh(Data Not Received)दिलली Delhi
हरियजणज Haryana
दहमजचल परिश Himachal Pradeshरमम कशमीि Jammu amp Kashmir(Data
Not Received)परजब Punjab
िजरसथजन Rajasthanउतति परिश Uttar Pradesh
उततिजखड Uttarakhand
पशचिमी कषतर Western Region
छततीसगढ़ Chhattisgarh
Apr-Nov 2018- No cuts
Maximum Demand cut-58MW
Energy cut- 00020-00032 MUsday
गरिजत Gujarat
मधय परिश Madhya Pradesh
महजिजषटर Maharashtra
गोवज Goa
दकषकषणी कषतर Southern Region
आनधर परिश Andhra Pradesh
तलगजनज Telangana
कनजाटक Karnataka
किल Kerala
तममल नजड Tamil Nadu
पडचिी Puducherryपरवी कषतर Eastern Region
बबहजि Bihar
झजिखणड Jharkhand
ओडडशज Odisha
पशशचम बगजल West Bengal
No N
otifie
d Cu
ts
27
मािण 2019 म इडथरीर पर वरवदयत करौती का वरवरवरण Notified Power CutsRestrictions on Industries during April2019
राजय कषतर State Regionऊराणमाग करौती EnergyDemand Cut
No N
otifie
d Cu
tsNo
Notifie
d Cu
ts
अपरल2019 April 2019 अपरल2019 -अपरल2019 April2019 to April2019
उततरी कषतर Northern Region
चडीगढ़ Chandigarh Data not received Data not received
दिलली Delhi Data not received Data not received
हरियजणज Haryana 0811 hrsday 0811 hrsday
दहमजचल परिश Himachal Pradesh HPSEBL has only 2 agriculture consumers and uninterrupted
power is being supplied to agriculture sector
HPSEBL has only 2 agriculture consumers and uninterrupted
power is being supplied to agriculture sector
रमम कशमीि Jammu amp Kashmir Data not received Data not received
परजब Punjab 379 hrsday 379 hrsday
िजरसथजन Rajasthan 0630 hrsday 0630 hrsday
उतति परिश Uttar Pradesh 2157 hrsday 2157 hrsday
उततिजखड Uttarakhand 2359 hrsday 2359 hrsday
पशचिमी कषतर Western Region
छततीसगढ़ Chhattisgarh 18 hrsday 18 hrsday
गरिजत Gujarat 8 hrsday 8 hrsday
मधय परिश Madhya Pradesh Three-Phase Supply(Irrigation)- 0953 hrs day Three-Phase
(Mixed) Supply - 2334 hrs day
Three-Phase Supply(Irrigation)- 0953 hrs day Three-Phase
(Mixed) Supply - 2334 hrs day
महजिजषटर Maharashtra Three-Phase Supply(Irrigation)- 9 hrs day Three-Phase Supply(Irrigation)- 9 hrs day
गोवज Goa No restriction No restriction
दकषकषणी कषतर Southern Region
आनधर परिश Andhra Pradesh 07 hrsday 07 hrsday
तलगजनज Telangana 24 hrsday 24 hrsday
कनजाटक Karnataka 6 hrsday 6 hrsday
किल Kerala No Restrictions No Restrictions
तममल नजड Tamil Nadu 9 hrsday (6 hrs during day time and 3 hrs during night time) 9 hrsday (6 hrs during day time and 3 hrs during night time)
पडचिी Puducherry No Restrictions No Restrictions
परवी कषतर Eastern Region
बबहजि Bihar 18 hrsday 18 hrsday
झजिखणड Jharkhand 20 hrsday 20 hrsday
ओडडशज Odisha 24 hrsday 24 hrsday
पशशचम बगजल West Bengal 23 hrsday 23 hrsday
28
मारच 2019 कषि कषतर को षिदयत आपरतच का षििरण Power Supply to Agricultural Sector during March2019
राजय कषतर State Regionऔसत वरवदयत आपरत ण घनरो म Average Hours of Supply
On segregated feeders
SNo Contents Page
1 Growth of Installed Capacity since 6th Plan 29
2 Progress of Transmission Sector since 6th Plan 30
3 All India Yearly Coal consumption for Power Generation (Utilities)
4 All India Annual Per Capita Consumption of Electricity since -2006
5 Average cost of power supply amp Average realisation (Paisakwh)
6 Growth of Rural Electrification amp Pump Sets Energisation
7 Status of Hydro Schemes Cleared by the CEA in Apr-2019
Section G - Growth of Power Sector
31
32
(In MW)
Coal Gas Diesel Total
End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472
End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634
End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537
End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596
End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921
End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703
End of 12th Plan 19216288 2532938 83763 21832988 6780 4447842 50018 31960630
Up to Apr-2019 20070450 2493722 63763 22627934 678000 4539922 7764163 35610019
Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-17) = 51529 MW
Electricity Generation (MU) Targets and Achievements for 2016-17
Coal Gas Diesel Nuclear Hydro Res Total
2007045 2493722 637629 678000 453992 77641625 22925174
29
1 Growth of Installed Capacity Since 6th Plan
Plan YearThermal
Nuclear Hydro RES (MNRE) Total
2007045
2493722637629
678000
4539922
77641625
Total Installed Capacity 35610019 MW
Coal Gas Diesel Nuclear Hydro Res
Progress of Transmission Sector in the Country up to April 2019
1 TRANSMISSION LINES (All fig in CKM)
At the end of
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
6th plan 0 0 0 0 0 0 0 0 0 0 0 0 1831 4198 0 6029 1641 44364 0 46005 3472 48562 0 52034
7th plan 0 0 0 0 0 0 0 0 0 0 0 0 13068 6756 0 19824 4560 55071 0 59631 17628 61827 0 79455
8th plan 0 0 0 0 1634 0 0 1634 0 0 0 0 23001 13141 0 36142 6564 73036 0 79600 31199 86177 0 117376
9th plan 0 0 0 0 3234 1504 0 4738 751 409 0 1160 29345 20033 0 49378 8687 88306 0 96993 42017 110252 0 152269
10th plan 0 0 0 0 4368 1504 0 5872 1775 409 0 2184 48708 24730 0 73438 9444 105185 0 114629 64295 131828 0 196123
11th Plan 0 0 0 0 5948 1504 1980 9432 4839 411 0 5250 71023 30191 5605 106819 10140 125010 830 135980 91950 157116 8415 257481
12th Plan 6124 0 0 6124 5948 1504 1980 9432 25465 1177 4598 31240 92482 48240 17065 157787 11014 151276 978 163268 141033 202197 24621 367851
13th Plan (Up
to Mar2019)6124 0 0 6124 5948 1504 1980 9432 33692 1512 6605 41809 101335 58238 21173 180746 11734 162552 1010 175296 158833 223806 30768 413407
13th Plan (Up
to Apr-19)6124 0 0 6124 5948 1504 1980 9432 33745 1512 6605 41862 101335 58258 21173 180766 11734 162953 1010 175697 158886 224227 30768 413881
27150 600 MW of 132 kV Inter-Regional power transmission capacity links which are operated radially from time to time is not added in the total
75050
47900
24000
99050
30
Grand Total
Note - The figure upto the end of 10th plan in for stringing progress including the lines not commissioned Now only commissioned lines are reckoned Accordingly the figure for 10th plan (end) may read
as 187555 after adjusting with (-) 10852 Ckm
Inter-regional Power Transfer Capacity (MW)
plusmn 800 kV HVDC plusmn 500 kV HVDC 765 kV 400 kV 220 kV
IR addition in 12th
Plan (up to March
2017)
Inter-regional
Transmission
Capacity at the end
of Plan Period 2017-
22 (as on April19)
IR at the end of 11th
PlanIR at the end of 12th
Plan
IR Capacity Addition
at the end of Plan
Period 2017-22 (Till
April 19)
2004-05 27800
2005-06 28100
2006-07 30200
2007-08 33000
2008-09 35500
2009-10 36700
2010-11 38700
2011-12 41756
2012-13 45460
2013-14 48940
2014-15 53040
2015-16 54590
2016-17 57430
2017-18 60800
2018-19 62890
Year
2005-06
2006-07
2007-08
2008-09
2009-10
2010-11
2011-12
2012-13
2013-14
2014-15
2015-16
2016-17
2017-18
2018-19
2004-05 254 209 7568
2005-06 260 221 7636
2006-07 276 227 7423
2007-08 293 239 7727
2008-09 340 263 8713
2009-10 355 268 8870
2010-11 398 303 11975
2011-12 455 330 13514
2012-13 501 376 14867
2013-14 518 175
2014-15 520
Source- PFC Reports on the performance of State Power Utilities 31
1181
7335
7786
91441
8188
88363
957
1010
1075
1122
1149
(GrossGen+ Net Import) Mid-year population Provisional
5 Average cost of power supply amp average realization ( paiseKWH )
Yearcost of supply
(paiseunit)
Realization(paiseunit)
Including AgricultureOnly
Agriculture
6719
7171
3 All India yearly Coal Consumption for Power Generation (Utilities)
YEARCoal Consumption
Million Tonnes
4 All India Annual per Capita consumption of Electricity Since 2006
Per Capita Consumption ( kWh)
6314
Sl
NoExecuting Agency
Installed
Capacity (MW)Cost (Rs crore)
Date of
Clearance
32
Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as
Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received
from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made
available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified
villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is
independent of the earlier published reports
No Hydro Electric Project has been issued concurrenceAppraisal letter by CEA during April 2019
7 Status of Hydro Schemes Cleared by the CEA in Apr-2019
Name of Scheme
1999-002000-01
297594
010408 to 310309010409 to 310310
10th Plan
2005-062006-07
322968331020
6 Growth Of Rural Electrification amp Pumpsets Energisation
Plan Year
9th Plan2002-03
134092626
4111
Pump Sets Energised Villages Electricfied (Nos)
2001-02
284064367244
1218
27801997-981998-99
3207
482864
12632
1576036
4451722594
15455554
2314176
397343611750
2093311060316074
65109527813884
46708
18423975
499150
2003-042004-05
5743
9769
Cumu upto End of 10th Plan
010407 to 310308
010410 to 310311557976840909
010411 to 310312
412667
86293726
No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification
since 2004-05
65291374575 296361511th Plan
Cumu upto End of 11th Plan
596556 21212860
557439Cummulative up to end of 12th Plan
SN Contents Page
1 Rate of sale of power for the year 2016-17 33-41
RATE OF SALE OF POWER FOR THE YEAR 2016-17
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) NORTHERN REGION
CENTRAL SECTOR
BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 18000 66900 19800
CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 54000 222400 21600
CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 30000 144400 19600
CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 23100 91700 42600
PARBATI - III HPS NHPC LTD HYDRO-HYDRO 52000 68200 54800
DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 28000 95600 30000
CHUTAK NHPC LTD HYDRO-HYDRO 4400 22000 79800
DULHASTI HPS NHPC LTD HYDRO-HYDRO 39000 228000 56400
SALAL HPS NHPC LTD HYDRO-HYDRO 69000 342300 11000
TANAKPUR HPS NHPC LTD HYDRO-HYDRO 9420 43000 29600
URI HPS -I NHPC LTD HYDRO-HYDRO 48000 280300 16000
URI HPS - II NHPC LTD HYDRO-HYDRO 24000 147300 48600
NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 4500 24600 88200
SEWA - II NHPC LTD HYDRO-HYDRO 12000 47100 43400
ANTA CCPP NTPC LTD THERMAL-GASN 41930 67539 32400
AURAIYA CCPP NTPC LTD THERMAL-GASN 66336 53501 39100
BADARPUR TPS NTPC LTD THERMAL-COAL 70500 159153 44800
DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 84000 296170 42300
DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 98000 526686 46300
DADRI CCPP NTPC LTD THERMAL-GASHSD 82978 227469 33000
FARIDABAD CCPP NTPC LTD THERMAL-GASN 43159 115577 30800
RIHAND STPS I NTPC LTD THERMAL-COAL 100000 596766 24500
RIHAND STPS II NTPC LTD THERMAL-COAL 100000 737069 24600
RIHAND STPS III NTPC LTD THERMAL-COAL 100000 706546 30600
SINGRAULI STPS NTPC LTD THERMAL-COAL 200000 1394068 20400
TANDA TPS NTPC LTD THERMAL-COAL 44000 295438 40800
UNCHAHAR TPS I NTPC LTD THERMAL-COAL 42000 256454 39800
UNCHAHAR TPS II NTPC LTD THERMAL-COAL 42000 273577 38900
UNCHAHAR TPS III NTPC LTD THERMAL-COAL 21000 142780 43000
KOLDAM NTPC LTD HYDRO-HYDRO 80000 363260 43600
NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 303575 25841
RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 108000 668677 35374
NJHPS SJVNL HYDRO-HYDRO 150000 699496 23820
RAMPUR HPS SJVNL HYDRO-HYDRO 41202 195982 32260
TEHRI HPP THDC HYDRO-HYDRO 100000 272543 51800
KOTESHWAR HEP THDC HYDRO-HYDRO 40000 106244 53400
IGSTPS JHAJJAR ARAVALI P CPL THERMAL-COAL 150000 510429 49490
NEYVELI BARSINGSAR NEYVELI LIG CORP LTD THERMAL-LIG 25000 127520 38040
STATE SECTOR
PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 21000 14222 48200
PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 21000 19205 48400
PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 25000 102257 42600
PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 25000 62107 41800
DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 60000 312213 41000
RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 120000 35767442200
WYC HYDEL STATION HPGCL HYDRO-HYDRO 6240 20365 24900
GIRI POWER HOUSE HPSEB HYDRO-HYDRO 6000 13958 7600
ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 1695 5467 11900
BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 12000 18528 6700
GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 2250 7462 22500
BASSI POWER HOUSE HPSEB HYDRO-HYDRO 6600 29649 7500
BINWA POWER HOUSE HPSEB HYDRO-HYDRO 600 2749 19300
ANNEXURE-I
RATE OF SALE OF POWER FOR THE YEAR 2016-2017
Page 33
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) GAJ POWER HOUSE HPSEB HYDRO-HYDRO 1050 2914 26700
BANER POWER HOUSE HPSEB HYDRO-HYDRO 1200 2864 16200
HOLI POWER HOUSE HPSEB HYDRO-HYDRO 300 616 22500
THIROT POWER HOUSE HPSEB HYDRO-HYDRO 450 1126 22500
KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 1200 3064 22500
LARJI POWER HOUSE HPSEB HYDRO-HYDRO 12600 53677 23700
NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 250 750 31000
CHABA POWER HOUSE HPSEB HYDRO-HYDRO 175 465 23300
RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 150 101 13400
SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 200 000 22500
KILLAR HPSEB HYDRO-HYDRO 030 050 22500
BHABA AUGUMENP H HPSEB HYDRO-HYDRO 450 1276 22500
BS CHAMBA HPSEB HYDRO-HYDRO 045 099 19500
GUMMA HPSEB HYDRO-HYDRO 300 423 22500
GAS TURBINE POWER STATION IPGCL THERMAL-GAS 27000 67233 39300
PPS-I PPCL THERMAL-GAS 33000 175905 38300
PPS-III PPCL THERMAL-GAS 137120 196879 36100
LOWER JHELUM JampKPDD HYDRO-HYDRO 10500 60214 5100
UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 2260 10514 6300
UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 10500 44202 8500
GANDHARBAL JampKPDD HYDRO-HYDRO 1500 8925 4700
KARNAH MPH JampKPDD HYDRO-HYDRO 200 1122 31000
CHENANI I JampKPDD HYDRO-HYDRO 2330 10892 6600
CHENANI II JampKPDD HYDRO-HYDRO 200 1188 9300
CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 750 3634 14200
IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 375 2108 18500
IGO MERCHELLONG JampKPDD HYDRO-HYDRO 300 1572 29700
PAHALGAM MHP JampKPDD HYDRO-HYDRO 450 1713 32900
MARPACHOO JampKPDD HYDRO-HYDRO 075 375 29800
HAFTAL JampKPDD HYDRO-HYDRO 100 483 28700
SANJAK JampKPDD HYDRO-HYDRO 126 441 36000
SEWA-III JampKPDD HYDRO-HYDRO 900 3273 20200
BHADERWAH JampKPDD HYDRO-HYDRO 150 935 8900
BAZGO JampKPDD HYDRO-HYDRO 030 108 33300
SUMOOR JampKPDD HYDRO-HYDRO 010 045 35400
HUNDER JampKPDD HYDRO-HYDRO 040 176 26200
STAKNA JampKPDD HYDRO-HYDRO 400 1933 4100
KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 124000 662879 31360
SURATGARH TPS RRVUNL THERMAL-COAL 150000 402328 41730
CHHABRA TPS 1amp 2 RRVUNL THERMAL-COAL 50000 305946 36700
CHHABRA TPS 3 RRVUNL THERMAL-COAL 25000 151536 36700
CHHABRA TPS 4 RRVUNL THERMAL-COAL 25000 155896 36700
RAMGARH GT POWER PROJECT RRVUNL THERMAL-COAL 22050 43177 41800
RAMGARH GAS T P PROJECT 3 RRVUNL THERMAL-GAS 5000 93615 41800
DHOLPUR C C POWER PROJECT RRVUNL THERMAL-R-LNG 33000 9486 46110
MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 14000 20855 34192
MINI MICRO HYDEL (MMH) P S RRVUNL HYDRO-HYDRO 2385 851 37800
KALISINDH TPP 1 RRVUNL THERMAL-COAL 60000 341543 45000
KALISINDH TPP 2 RRVUNL THERMAL-COAL 60000 211588 45000
KHARA HEP UPJVNL HYDRO-HYDRO 7200 26654 7200
MATATILLA HEP UPJVNL HYDRO-HYDRO 3060 12219 6500
OBRA HEP UPJVNL HYDRO-HYDRO 9900 21517 6300
RIHAND UPJVNL HYDRO-HYDRO 30000 57369 5500
ANPARA A TPS UPRVUNL THERMAL-COAL 63000 317536 27000
ANPARA B TPS UPRVUNL THERMAL-COAL 100000 705605 22700
ANPARA D UPRVUNL THERMAL-COAL 100000 300158 39800
HARDUAGANJ TPS UPRVUNL THERMAL-COAL 16500 45817 49200
HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 50000 304389 46600
OBRA A TPS UPRVUNL THERMAL-COAL 28800 13158 34000
OBRA B TPS UPRVUNL THERMAL-COAL 100000 328124 21900
Page 34
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) PANKI TPS UPRVUNL THERMAL-COAL 21000 66488 50300
PARICHHA TPS UPRVUNL THERMAL-COAL 22000 38762 49400
PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 42000 231931 45600
PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 50000 276722 50400
CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 24000 70845 8290
CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 14400 75366 8390
DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 3375 9595 12080
DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 5100 18701 10520
KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4140 17359 12330
KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 12000 33001 9420
KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 3000 11953 8320
TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 9000 33983 12460
MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 30400 124510 16110
RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 19800 17897 10550
MPUR UTTARAKHAND JVNL HYDRO-HYDRO 930 5121 19200
PATHRI UTTARAKHAND JVNL HYDRO-HYDRO 2040 11636 14200
GALOGI UTTARAKHAND JVNL HYDRO-HYDRO 300 648 12500
PRIVATE SECTOR
MGTPP CLP INDIA PVT LTD THERMAL-COAL 132000 268902 41940
SHRINAGAR HEP ALAKNANDA HPCL HYDRO-HYDRO 33000 127414 48800
GAMA INFRAPROP CCPP GAMA INFRAPROP PVT THERMAL-GAS 22500 52686 47000
PPGCL (BARA) JP POWER VENTURES LTD THERMAL-COAL 198000 448200 38500
MALANA HEP MALANA PCL HYDRO-HYDRO 8600 26354 29792
MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 10000 30369 32580
ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 19200 56347 36079
KASHANG HEP H P PCL HYDRO-HYDRO 19500 5034 29200
BASPA-II HEP HBPCL HYDRO-HYDRO 30000 132769 13600
KARCHAM WANGTOO HEP HBPCL HYDRO-HYDRO 100000 434386 36600
RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 108000 582600 43700
RITHALA COMBI CY POWER PLANT TATA POWER DDL THERMAL-GAS 9480 000 11900
RAJPURA TPS NABHA POWER LTD THERMAL-GAS 140000 901484 39000
TALWANDI SABO POWER LTD TALWANDI SABO POWER LTD THERMAL-COAL 198000 636040 49548
ROJA THERMAL POWER STATION ROJA POWER SCL THERMAL-COAL 120000 727200 43400
KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 34400 63400
BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 36000 62600
MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 38200 60800
UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 37900 61500
KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 42300 58800
LALITPUR PGCL BAJAJ ENERGY PVT LTD THERMAL-COAL 198000 359400 47300
PRAYAGRAJ PGCL PRAYAGRAJ PGCL THERMAL-COAL 132000 448200 38595
KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 132000 783182 33438
WESTERN REGION
CENTRAL SECTOR
INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 100000 325333 23892
OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 52000 141663 34001
GANDHAR CCPP NTPC LTD THERMAL-GAS 65739 221924 28700
KAWAS CCPP NTPC LTD THERMAL-GASN 65620 167929 27000
KORBA I amp II NTPC LTD THERMAL-COAL 210000 1499171 20500
KORBA III NTPC LTD THERMAL-COAL 50000 358746 26600
SIPAT STPS I NTPC LTD THERMAL-COAL 198000 1479902 26800
SIPAT STPS II NTPC LTD THERMAL-COAL 100000 766549 26500
VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 126000 693142 25800
VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 100000 608781 23800
VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 100000 673475 27600
VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 100000 655924 32900
VINDHYACHAL STPS V NTPC LTD THERMAL-COAL 50000 328265 31700
MOUDA I NTPC LTD THERMAL-COAL 100000 343130 44500
MOUDA Ii NTPC LTD THERMAL-COAL 66000 40637 39900
RATNAGIRI GAS amp POWER PVT LTD RGPPL THERMAL-GAS 196708 442485 47000
KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 000 24729
TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 32000 201227 10740
Page 35
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 365122 19069
TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 787444 29324
STATE SECTOR
GSEG-HAZIRA15610 MW GUJARAT S ENEGEN LTD THERMAL-GAS 15610 1805 28200
GSEG-HAZIRA35143 MW GUJARAT S ENEGEN LTD THERMAL-GAS 35130 22276 51300
GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 21978 51800
AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 13929 26100
KORBA TPS EAST CSPGCL THERMAL-COAL 44000 198673 33880
DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 365808 27570
KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 316500 30420
HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 532878 19410
CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 515 58300
MTTPS CHAMPA U-I CSPGCL THERMAL-COAL 50000 220376 39000
MTTPS CHAMPA U-II CSPGCL THERMAL-COAL 50000 23709 10000
SHP GANGREL CSPGCL HYDRO-HYDRO 1000 2350 36790
BANGO HEP CSPGCL HYDRO-HYDRO 12000 14662 8900
MHP KORBA WEST CSPGCL HYDRO-HYDRO 170 859 38190
SIKASAR HEP CSPGCL HYDRO-HYDRO 700 418 26870
DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8843 74500
DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 19446 51500
GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 66388 71600
GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127488 41300
KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 96072 43900
KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 29841 56400
SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 184966 58800
UKAI 1-5 GSECL THERMAL-COAL 85000 204891 46900
UKAI TPS 6 GSECL THERMAL-COAL 50000 284448 48200
WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 271999 58300
WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 82808 44100
KADANA HPS GSECL HYDRO-HYDRO 24200 34433 16800
UKAI HPS GSECL HYDRO-HYDRO 30500 40585 6100
TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 123000 11500
BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 8900 10900
BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 7200 27500
JHINNA HPS MPPGCL HYDRO-HYDRO 2000 9700 18500
RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 44300 3400
GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 17300 4600
SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 4100 16900
MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 14600 27000
PENCH HPS MPPGCL HYDRO-HYDRO 16000 23700 8100
RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 3000 16900
AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 134400 35100
SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 283800 38700
SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 344600 34300
SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 111600 61600
SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 211800 58000
SSTPS PH-I MPPGCL THERMAL-COAL 120000 233100 84300
BHUSAWAL TPS MSPGCL THERMAL-COAL 142000 566258 51100
CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1365682 33700
KHAPERKHEDA MSPGCL THERMAL-COAL 134000 706207 39100
KORADI TPS MSPGCL THERMAL-COAL 62000 443206 42000
NASIK TPS MSPGCL THERMAL-COAL 63000 297275 47000
PARLI TPS MSPGCL THERMAL-COAL 113000 175934 71600
PARAS MSPGCL THERMAL-COAL 50000 267931 38700
URAN CCPP MSPGCL THERMAL-GAS 67200 320330 30600
KOYANA MSPGCL HYDRO-HYDRO 195600 328155 13100
SMALL HYDRO POWER PLANTS MSPGCL HYDRO-HYDRO 45400 93062 30500
BHIRA MSPGCL HYDRO-HYDRO 8000 10046 8400
TILLARI MSPGCL HYDRO-HYDRO 8900 10584 3100
SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 233298 20500
SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 87633 20500
PRIVATE SECTOR
Page 36
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 81282 46750
JNSTPP(JAYPEE NIGRIE) JP POWER VENTURES LTD THERMAL-COAL 132000 726695 29310
MB POWER MB POWER THERMAL-COAL 120000 345632 38310
ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 754922 28671
ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 780761 23495
ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 198000 1263784 32090
ADANI POWER MAHARA ADANI POWER LTD THERMAL-COAL 330000 1666191 34124
AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 170065 36827
SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 252035 45129
ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 458551 36000
ESSAR POWER MP LTD ESSAR POWER MP LTD THERMAL-COAL 60000 243040 28600
VEDANTA LTD (P P -I) VEDANTA LTD THERMAL-GAS 3000 15044 24000
VEDANTA LTD (P P -II) VEDANTA LTD THERMAL-GAS 3000 21293 24000
PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 8234600 24000
165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 5850 64390
145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 68717 40349
SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 132655 28776
SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 144686 38567
MUNDRA UMPPCOASTAL GUJARAT POWER
LTD THERMAL-IMP COAL 400000 2530300
23900
LANCO AMARKANTAK TPP PATHADIH
U-ILANCO AMARKAN POWER LTD THERMAL-COAL 30000 195500
29200
LANCO AMARKANTAK TPP PATHADIH
U-IILANCO AMARKAN POWER LTD THERMAL-COAL 30000 206900
27600
BARADARHA TPS D B POWER LTD THERMAL-COAL 120000 677373 29200
JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 405000 28900
JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 453000 40500
DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 339437 40700
TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 293400 44000
TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 137200 37000
TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 174900 44000
BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 92900 14100
BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23700 34300
KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 27600 48300
CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2530300 23900
BHANDARDRA HEP -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 2475 54900
SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 161400 26500
SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 445000 39000
SOTHERN REGION
CENTRAL SECTOR
NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 325699 54820
NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 305532 39880
NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 998805 38510
NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 113016 54070
NEYVELI TAMILNADU POWER LTD JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 625274 42200
VALLUR TPS NTPC TECL THERMAL-COAL 150000 856438 42350
R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 1493 84300
RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1502919 29400
RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 341291 31800
SIMHADRI I NTPC LTD THERMAL-COAL 100000 688382 36800
SIMHADRI II NTPC LTD THERMAL-COAL 100000 663657 43400
KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 593110 31324
MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 291625 21764
KKNPP-1 amp 2 NPCIL NUCLEAR-NUCLEAR 200000 572609 40948
MINICOY LAKSHADEEP THERMAL-DIESEL 340 770 29600
KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1097 29600
AMINI LAKSHADEEP THERMAL-DIESEL 265 509 29600
ANDROTT LAKSHADEEP THERMAL-DIESEL 219 524 29600
KALPENI LAKSHADEEP THERMAL-DIESEL 175 356 29600
AGATTI LAKSHADEEP THERMAL-DIESEL 195 658 29600
KADMAT LAKSHADEEP THERMAL-DIESEL 190 414 29600
KILTAN LAKSHADEEP THERMAL-DIESEL 150 269 29600
CHETLET LAKSHADEEP THERMAL-DIESEL 100 139 29600
BITRA LAKSHADEEP THERMAL-DIESEL 043 024 29600
BANGARAM LAKSHADEEP THERMAL-DIESEL 018 009 29600
Page 37
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) STATE SECTOR
Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 721811 46500
Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 50000 336142 46500
RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 237358 46500
RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 239926 46500
RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 124500 46500
SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 62109 46500
UPPER SILERU APGENCO HYDRO-HYDRO 24000 33000 46500
LOWER SILERU APGENCO HYDRO-HYDRO 46000 81066 46500
DONKARAI APGENCO HYDRO-HYDRO 2500 6007 46500
PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 1262 46500
CHETTIPETA APGENCO HYDRO-HYDRO 100 214 46500
MUCHKUND APGENCO HYDRO-HYDRO 12000 37571 46500
NAGARJUNASAGAR RCPH APGENCO HYDRO-HYDRO 9000 606 46500
TUNGABHADRA HES amp HAMPI(AP
Share)
APGENCO HYDRO-HYDRO 7200 6100 46500
KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 352232 42600
KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 288131 32500
KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 319272 46500
RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 40073 44300
KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 308317 46000
KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 308963 51300
SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 61004 76600
NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 17960 75300
PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 20873 58300
POCHAMPAD-I TSPGENCO HYDRO-HYDRO 2700 5455 29800
POCHAMPAD-II TSPGENCO HYDRO-HYDRO 900 1932 40700
NIZAMSAGAR TSPGENCO HYDRO-HYDRO 1000 1126 53400
RAICHUR TPS 1 to 7 KPCL THERMAL-COAL 147000 890866 43800
RAICHUR TPS 8 KPCL THERMAL-COAL 25000 159523 48200
BELLARI TPS 1 KPCL THERMAL-COAL 50000 318679 51100
BELLARI TPS 2 KPCL THERMAL-COAL 50000 232347 55600
BELLARI TPS 3 KPCL THERMAL-COAL 70000 47565 34400
BHADRA PH KPCL HYDRO-HYDRO 3920 2369 45900
GERUSUPPA PH KPCL HYDRO-HYDRO 24000 26990 22000
GHAT PRABHA HEP KPCL HYDRO-HYDRO 3200 4777 25300
KADRA HPS KPCL HYDRO-HYDRO 15000 16889 26800
NAGJHARI KPCL HYDRO-HYDRO 90000 155159 9800
KODASALLI DPH KPCL HYDRO-HYDRO 12000 14854 19200
MUNIRA+MGH+SPH+SPH KPCL HYDRO-HYDRO 22640 48211 7900
SHARAVATHY HPS KPCL HYDRO-HYDRO 108550 276215 5400
ALMATTI DPH KPCL HYDRO-HYDRO 29000 39611 24600
VARAHI UGPH KPCL HYDRO-HYDRO 46000 71368 15600
IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 17196 15300
IDUKKI HPS KSEB HYDRO-HYDRO 78000 137905 15300
KAKKAD HPS KSEB HYDRO-HYDRO 5000 13063 15300
KALLADA HPS KSEB HYDRO-HYDRO 1500 4436 15300
KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 46544 15300
KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 635 15300
LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 30822 15300
MALANKARA HPS KSEB HYDRO-HYDRO 1050 2474 15300
MATTUPETTY KSEB HYDRO-HYDRO 200 230 15300
MALAMPUZHA KSEB HYDRO-HYDRO 250 063 15300
CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 864 15300
URUMI ST I amp II KSEB HYDRO-HYDRO 615 903 15300
LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 248 15300
NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7765 19625 15300
PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 16601 15300
PANNIAR HPS KSEB HYDRO-HYDRO 3240 6217 15300
PORINGALKUTHU KSEB HYDRO-HYDRO 3600 10052 15300
PORINGALKUTHU LBE KSEB HYDRO-HYDRO 1600 9438 15300
PEPPARA KSEB HYDRO-HYDRO 300 395 15300
POOZHITHODE KSEB HYDRO-HYDRO 480 1045 15300
Page 38
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) PEECHI KSEB HYDRO-HYDRO 125 040 15300
RANI-PERUNADU KSEB HYDRO-HYDRO 400 585 15300
SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 79783 15300
SENGULAM HPS KSEB HYDRO-HYDRO 5120 11558 15300
SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 16711 15300
VILANGAD KSEB HYDRO-HYDRO 750 1578 15300
BARAPOLE KSEB HYDRO-HYDRO 1500 1932 15300
VELLATHOOVAL KSEB HYDRO-HYDRO 360 305 15300
CHIM0NY KSEB HYDRO-HYDRO 250 156 15300
ADYANPARA KSEB HYDRO-HYDRO 350 501 15300
BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 554 15300
KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 3801 15300
KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 23132 32800
ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 14416 62280
METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 523970 62280
METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 321270 62280
NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 336575 62280
NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 591240 62280
TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 508966 62280
KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 30897 62280
VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 18720 90699 62280
KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 33593 62280
BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 1047 62280
PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 1250 62280
PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 330 62280
MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 4897 62280
MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 032 62280
KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15681 62280
KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 40608 62280
KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 21342 62280
KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 4717 62280
KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4322 62280
KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2399 62280
METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 4416 62280
METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 8035 62280
BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2187 62280
BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2359 62280
BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2511 62280
BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 1949 62280
BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 1819 62280
POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 172 62280
SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 241 62280
MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 026 62280
THIRUMOORTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 136 62280
PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 9309 62280
VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 353 62280
SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 4192 62280
PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 6571 62280
SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 1186 62280
SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6319 62280
ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 6122 62280
KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 28674 62280
SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 18381 62280
SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 4258 62280
KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 12680 62280
KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4201 62280
ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 000 62280
PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 19175 62280
AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 078 62280
BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 504 62280
BHAVANI KATTALAI (BKB)(IIIampIII BB I amp II)TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 5847 62280
PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 000 62280
Page 39
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) SRI DAMODARAM STPS APPDCL THERMAL-COAL 160000 808108 36300
PRIVATE SECTOR
KARUPPUR TANJORE LANCO TANJORE PCL THERMAL-GAS 12000 48096 28770
SIMHAPURI ENERGY LTD SIMHAPURI ENERGY LTD THERMAL-COAL 60000 143900 39100
JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 7111 45500
SBU 1 JSW ENERGY LTD
VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 26000 159100
43300
SBU 2 JSW ENERGY LTD
VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 60000 247900
42800
LANCO KPLLANCO KONDAPALLI POWER
LTDTHERMAL-GAS 36814 85060
25776
LANCO KPL STG -IILANCO KONDAPALLI POWER
LTDTHERMAL-GAS 36600 12979
46330
LANCO KPL STG -IIIALANCO KONDAPALLI POWER
LTDTHERMAL-GAS 37100 85710
46330
LANCO KPL STG -III BLANCO KONDAPALLI POWER
LTDTHERMAL-GAS 37100 43639
46330
HINDUJA NATIONAL PCL HINDUJA NATIONAL PCL THERMAL-COAL 104000 303000 38200
MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 121164 49940
UDUPI POWER COR LTD ADANI POWER LTD THERMAL-COAL 120000 754613 42500
SPECTRUM POWER GENERATION
LTD SPECTRUM PG LTD THERMAL-GASN 20525 9256812
34952
TAQA NEYVELI POWER COM PVT
LTD TAQA NEYVELI THERMAL-LIG 25000 5840
34500
ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 251000 51000
ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 207860 36800
GMR VEMAGIRI POWER GENERATION
LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 30117
46450
EASTERN REGION
CENTRAL SECTOR
MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 64675 53113
MTPS STAGE - II KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 39000 1432 69138
BOKARO `B` TPS DVC THERMAL-COAL 63000 145670 31539
MEJIA TPS U 1-3 DVC THERMAL-COAL 63000 348298 31552
MEJIA TPS U 4 DVC THERMAL-COAL 21000 116099 34997
MEJIA TPS U 5-6 DVC THERMAL-COAL 50000 276427 35976
MEJIA TPS U 7-8 DVC THERMAL-COAL 100000 552854 36991
DURGAPUR STEEL TPS DVC THERMAL-COAL 100000 665550 39323
DURGAPUR TPS DVC THERMAL-COAL 21000 59270 35416
RAGHUNATHPUR TPS DVC THERMAL-COAL 120000 201650 35326
MAITHON HYDEL STA DVC HYDRO-HYDRO 6320 12200 17984
CHANDRAPURA TPSU1-3 DVC THERMAL-COAL 42000 257610 35095
CHANDRAPURA TPSU7-8 DVC THERMAL-COAL 50000 306673 34987
KODERMA TPS DVC THERMAL-COAL 100000 380180 38131
PANCHET HPS DVC HYDRO-HYDRO 8000 13360 17984
TILLAYA HPS DVC HYDRO-HYDRO 400 1410 17984
RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34700 35400
TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 277300 23200
TLDP -III NHPC LTD HYDRO-HYDRO 13200 55400 62000
TLDP -IV NHPC LTD HYDRO-HYDRO 16000 60300 25600
FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 957219 33700
FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 308943 41000
BONGAINGAON TPS NTPC LTD THERMAL-COAL 25000 153663 58600
KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 542277 34200
KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 942591 34200
BARH-II NTPC LTD THERMAL-COAL 132000 728021 44500
TALCHER TPS NTPC LTD THERMAL-COAL 46000 335521 30100
TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 702319 25600
TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1436521 24700
STATE SECTOR
BTPS(RampM) BIHAR STATE PGCL THERMAL-COAL 22000 12142 39700
BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 98331 10602
HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 50593 9482
CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 19689 2605
RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 53192 6033
UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 147208 14637
Page 40
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 60353 4519
IB TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 288567 25000
J P H GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 210 038 61100
MEYONG CHU GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 400 1086 61100
TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 122667 38200
DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 214339 43321
KOLAGHAT THERMAL POWER
STATION
WEST BENGAL PDCL THERMAL-COAL 126000 538269 31603
BAKRESHWAR THERMAL POWER
PLANT
WEST BENGAL PDCL THERMAL-COAL 105000 634876 32154
BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 45000 166855 33299
SANTHALDIH THERMAL POWER
STATION
WEST BENGAL PDCL THERMAL-COAL 50000 336442 34932
SAGARDIGHI THERMAL POWER
PROJECT
WEST BENGAL PDCL THERMAL-COAL 160000 423121 34705
JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 20344 68900
RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 24559 68900
TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 4623 68900
PURULIA PUMPED STORAGE
PROJECT
WEST BENGAL SEDCL HYDRO-HYDRO 90000 108816 68900
MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2768 68900
PRIVATE SECTOR
CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 49474 20230
CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 555500 70200
HALDIA ENERGY HALDIA ENERGY LTD THERMAL-COAL 60000 371000 50400
DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3688 63400
KAMALANGA TPS GMR KAMALANGA ENERGY LTD THERMAL-COAL 105000547670
33300
ADHUNIK POWER U-1 ADHUNIK POWER THERMAL-COAL 27000 158 44060
ADHUNIK POWER U-2 ADHUNIK POWER THERMAL-COAL 27000 168 44250
VL-JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 332800 23622
JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 43000 45250
JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 71700 37030
JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 70700 35920
JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 71100 38870
JOJOBERA UNIT 5 TATA POWER COM LTD THERMAL-COAL 12000 79300 44560
JOJOBERA UNIT 6 TATA POWER COM LTD THERMAL-WHR 12000 83700 12840
IEL KALINGANAGAR U-I TATA POWER COM LTD THERMAL-WG 6750 33400 22500
IEL KALINGANAGAR U-II TATA POWER COM LTD THERMAL-WG 6750 34800 22500
MAITHON UNIT 1 amp 2 TATA POWER COM LTD THERMAL-COAL 105000 678000 36100
HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 27500 24340
HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 28400 24340
HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 15800 24310
NORTH EASTERN REGION
CENTRAL SECTOR
LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 74100 36600
AGARTALA GT NEEPCO THERMAL-GAS 13500 88611 27210
ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 153111 32310
DOYANG HEP NEEPCO HYDRO-HYDRO 7500 25598 49801
KOPILI HEP NEEPCO HYDRO-HYDRO 20000 98186 11491
KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 19582 20237
KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 10310 17968
RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 124093 22945
TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 10100 17344 39000
STATE SECTOR
HYDRO POWER (122 Stns) ITANAGAR GOVT OF ARUNACHAL
PRADESHHYDRO-HYDRO 6971 6217270
24600
KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39514 17337
LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 82327 36810
NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 33318 48290
MYNTRIANG SHEP ST II ASSAM POWER GENCO HYDRO-HYDRO 300 567 35776
LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 9130 49200
LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 012 49200
DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 022 49200
TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 000 49200
UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 4990 16000
UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 6476 37000
UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 16494 14600
UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 3600 9556 15000
SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 758 8000
MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44070 44800
KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 154 41400
TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 091 41400
MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 411 41400
MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 394 41400
KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 760 41400
SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 3264 41400
LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 044 41400
BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 18953 28000
ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 43585 28200
GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 4080 11100
Note
LIG Lignite N Naptha WHR Waste Heat Recovery
Page 41
Generation from
Conventional
Sources
Generation
from
Renewable
Sources
Total Generation from
Conventional Sources
Generation from
Renewable SourcesTotal
Growth in
Conventional
Generation
Growth in
Renewable
Generation
Growth in
Total
Generation
(BU) (BU) (BU) (BU) (BU) (BU) () () ()
108929 9900 118829 103889 8443 112332 485 1726 578
Note Tentative
SlNo
Source-Wise All
India
Generation
from
Renewables Mar-2019 Mar-2018 April 2018 to March 2019 April 2017 to March 2018
1 Wind 2965930 2906760 62036380 52666090
2 Solar 4307980 3311530 39268200 25871070
3 Biomass 255320 270430 2763820 3404950
4 Bagasse 1814860 1794220 13562670 11847350
5 Small Hydro 473060 376850 8702750 7691580
6 Others 30700 33120 425280 358450
Total 9847850 8692910 126759100 101839490
Note 1) Data as received from SLDCElectricity Department of the respective states or from the electricity department
2) 25 MW Khopli-II project of NEEPCO located in Assam is considered under Small Hydro wef 01072018 Earlier it was considered under Hydro
3) Previous month generation has been taken as SLDC has not furnished generation data for the current month
Electricity Generation (Conventional and Renewable Sources)
Apr-2019 Apr-2018 Growth
1B
For the Month of Cummulative for the period
All India Generation From Renewables (All Figures are in MU)
Achievement Targets Achievement
Apr-18
Thermal 69755 1160 0 000
Hydro 0 0 0 NA
Nuclear 0 0 0 NA
All India 69755 1160 0 000
Apr-18 to Apr-18 Apr-19 to Apr-19 Change wrt Previous Year
Thermal 69755 0 00
Hydro 0000 0 NA
Nuclear 0000 0 NA
All India 69755 0 00
2
2 Generating Capacity Addition for Apr-2019 (MW)
Generating Capacity Addition during Apr-18 to Apr-18 amp Apr-19 to Apr-19
NA- Not Applicable
Achivement
wrt Apr-2018Type
Apr-19
698
000
10
20
30
40
50
60
70
80
1Apr-18 Apr-19
0000
10000
20000
30000
40000
50000
60000
70000
80000
Apr-18 to Apr-18 Apr-19 to Apr-19
1
2
3
Nuclear Hydro RES Grand TotalRegion Coal Lignite Gas Diesel Total
Northern 5036020 158000 578126 000 5772146 162000 1970777 1419902 9324825
Western 7280862 154000 1080649 000 8515511 184000 754750 2307894 11762155
Southern 4304202 314000 647366 56158 5321726 332000 1177483 3862018 10693227
Eastern 2746364 000 10000 000 2756364 000 494212 140148 3390724
North-East 77002 000 177581 3600 258183 000 142700 32429 433311
Islands 000 000 000 4005 4005 000 000 1773 5778
ALL INDIA 19444450 626000 2493722 63763 22627934 678000 4539922 7764163 35610019
Note Captive Genaration is not included in the total Captive Power capacity as on 31032017 RES as on 31032019 3
Thermal
Nuclear
3 List of Projects Commissioned During Apr-2019
4 All India Installed Capacity (MW) Region-wise as on 30-04-19
NIL
NIL
Thermal
NIL
Hydro
22627934
678000
4539922
7764163
35610019
51529
000
5000000
10000000
15000000
20000000
25000000
30000000
35000000
40000000
Thermal Nuclear Hydro RES Total Captive
Thermal Nuclear Hydro RES Total Captive
Total = 356100189
Sector
Coal Lignite Gas Diesel Total
State 6407650 129000 711871 36393 7284913 000 2987880 234793 10507586
Private 7468800 183000 1058060 27370 8737230 000 339400 7366140 16442770
Central 5568000 314000 723791 000 6605791 678000 1212642 163230 8659663
All India 19444450 626000 2493722 63763 22627934 678000 4539922 7764163 35610019
State 10507586
Private 16442770
Central 8659663
Electricity Generation (MU) Targets and Achievements for 2016-17
5 All India Installed Capacity (MW) Sector-wise as on 30-04-19
4
Grand TotalTHERMAL
Nuclear Hydro RES
RES as on 31032019
State 10507586 30
Private 16442770 46
Central 8659663 24
All India Installed Capacity(MW) (Sector-Wise)
Voltage Level
+- 500 KV HVDC
+- 800 KV HVDC
765 KV
400 KV
220 KV
All India
Voltage Level
+- 500 KV HVDC
+- 800 KV HVDC
765 KV
400 kV
220 KV
All India
5
481 401
763 474
0 0
242 53
40 20
0 0
242 53
40 20
481 401
763 474
Transmission Lines Added duringApr-18 to Apr-18 ampApr-19 to Apr-19 (Ckms)
Apr-18 to Apr-18 Apr-19 to Apr-19
0 0
6 Transmission Lines Added during Apr-2019 (Ckms)
Apr-18 Apr-19
0 0
763
474
0
100
200
300
400
500
600
700
800
900
All India
Ckm
s
Apr-18 Apr-19
763
474
0
100
200
300
400
500
600
700
800
900
All India
Ckm
s
Apr-18 to Apr-18 Apr-19 to Apr-19
Voltage Level
+- 800 KV HVDC
+- 500 KV HVDC
765 KV
400 KV
220 KV
All India
Voltage Level
+- 800 KV HVDC
+- 500 KV HVDC
765 KV
400 KV
220 KV
All India
6
0 0
All India Transformation Capacity Addition during Apr-18 to Apr-18 amp Apr-19
to Apr-19 (MVA)
4600
0
500
2795
1305
5470
4000
185
1285
0
Apr-18 to Apr-18 Apr-19 to Apr-19
5470
0
500
4600
2795
1305
7 Transformation Capacity Addition During Apr-2019 (MVA)
0
4000
185
1285
0 0
Apr-18 Apr-19
5470
4600
4000
4200
4400
4600
4800
5000
5200
5400
5600
MV
A
Apr-18 Apr-19
5470 4600
0
74520
1
MV
A
Apr-18 to Apr-18 Apr-19 to Apr-19
Apr-2018 Apr-2019 Apr-2018 Apr-2019 Apr-2018 Apr-2019
Northern 28590 30094 28170 29786 -15 -10
Western 33235 34875 33233 34868 00 00
Southern 29211 31111 29166 31109 -02 00
Eastern 11752 12851 11650 12850 -09 00
North Eastern 1225 1300 1174 1228 -42 -55
All India 104013 110231 103393 109842 -06 -04
Apr-2018 Apr-2019 Apr-2018 Apr-2019 Apr-2018 Apr-2019
Northern 48824 54476 48367 53985 -09 -09
Western 50654 56242 50434 56222 -04 00
Southern 45946 49155 45684 49103 -06 -01
Eastern 21320 23349 21275 23349 -02 00
North Eastern 2600 2848 2552 2780 -18 -24
All India 162492 177411 161286 176810 -07 -03
Apr-2019 Figures are Provisional
7
8 Power Supply Position (Energy amp Peak) in Apr-2019
Peak Demand Peak Met
Requirement Availability
Energy (MU)Region
Surplus(+)
Deficit (-) in
Surplus(+)
Deficit (-) in Region
Power (MW)
Chandigarh Delhi Haryana HP JampK Punjab Rajasthan UP Utrakhand Apr-2018 0 0 0 0 546 0 0 247 0
Apr-2019 0 0 0 0 565 0 0 0 0
Chattisgarh Gujarat MP Maharashtra Daman amp Diu Dadar Nagar Goa
Apr-2018 13 11 3 99 0 0 0
Apr-2019 22 6 0 8 1 0 0
AP Telangana Karnataka Kerala Tamil Nadu Puducherry Lakshadweep
Apr-2018 22 0 2 0 0 20 0
Apr-2019 0 0 0 8 0 2 0
8
9 Peak Shortage of Power Supply (MW) in Different Regions in Apr-2019
0 0 0 0
565
0 0 0 00 0 0 0
546
0 0
247
0
0
400
800
Ch
an
dig
ar
h Delh
i
Ha
rya
na
HP
Jamp
K
Pu
nja
b
Ra
jasth
an
UP
Utr
akhan
d
MW
Northern States (MW) Apr-2019 Apr-2018
22
6 0 8 1 0 0
13
11
3
99
0 0 0
0
50
100
150
Ch
attis
gar
h
Guja
rat
MP
Mah
ara
shtr
a
Da
man amp
Diu
Da
dar
Na
gar G
oa
MW
Western States (MW) Apr-2019 Apr-2018
0 0 08
0 2 0
22
0 2 0 0
20
00
50
AP Telangana Karnataka Kerala Tamil Nadu Puducherry Lakshadweep
Southern State (MW) Apr-2019 Apr-2018
Bihar DVC Jharkhand Odisha West Bengal Sikkim AampN Island
Apr-2018 0 39 0 0 7 0 4
Apr-2019 0 0 0 0 0 0 4
Arunachal Assam Manipur Meghalaya Mizoram Nagaland Tripura
Apr-2018 5 30 7 0 9 29 4
Apr-2019 3 45 9 0 3 26 1
9
0 0 0 0 0 0
4
0
39
0 0
7
0
4
01020304050
Bih
ar
DV
C
Jha
rkh
an
d
Od
ish
a
We
st
Be
ng
al
Sik
kim
Aamp
NIs
land
MW
Eastern States (MW) Apr-2019 Apr-2018
3
45
9
0 3
26
1
5 7
0
9
29
4
0
10
20
30
40
50
Aru
na
cha
l
Assa
m
Ma
nip
ur
Me
gh
ala
ya
Miz
ora
m
Na
gala
nd
Trip
ura
MW
North-Eastern States (MW)
Sector Apr-2018 Apr-2019
Central 7634 7459
State 6438 6142
Private Sector IPP 5525 6005
Private Sector UTL 6815 6440
ALL INDIA 6454 6471
Month PLF 2018 PLF 2019
Jan 6215 6054
Feb 6230 6051
March 6452 6340
April 6454 6471
For Coal and Lignite based Power Plants and Provisional based on Actual-Cum-Assesment
10
PLF of Thermal Power Plants
(excluding gas based power plants)
All India PLF of Thermal Plants (Excluding Gas Based Plants) Month-wise
10 All India Thermal PLF Sector-wise (Excluding Gas Based Power Plants) for Apr-2019
5800
6000
6200
6400
6600
Jan Feb March April
Months
All India PLF Month-wise
PLF 2018 PLF 2019
7634
64385525
6815 6454
7459
6142 60056440 6471
000
2000
4000
6000
8000
10000
Central State Private Sector IPP Private Sector UTL ALL INDIA
All India Thermal PLF
Apr-2018 Apr-2019
2012-13 2013-14 2014-15 2015-16 2016-17 2017-18
TampD Losses 2304 2284 2277 2181 2142 2104
ATampC Losses 2548 2262 2572 2398 NA NA
Provisional
Note As per PFC for utilities selling directly to consumers NA- Not Available
Total Number of Villages
597464
Note From the year 2004-05 onwards Definition of Village Electrification-
A village would be declared Electrified if
Without
Subsidy
Gap ACS-
ARR(
Without
Subsidy)
Paiseunit
Gap ACS-
ARR (on
subsidy
booked
basis)
paiseunit
Gap ACS-
ARR (on
subsidyrece
ived basis)
paiseunit
2013-14 400 118 76 77
2014-15 412 108 58 60
Source- PFC Reports on the performance of State Power Utilities
2013-14 4894
2014-15 5304
2015-16 5459
2016-17 5743
2017-18 6080
2018-19 6289
11
11 T amp D and ATampC Losses ()
12 All India Village Electrification
Villiages Electrified (Nos)
10000All villages as per census 2011 has
been electrified on 28042018
Villages electrified
Average cost of supply(ACS)
(paiseunit)
i) Basic Infrastructure such as Distribution Transformer and Distribution lines are provided in the inhabited locality
as well as Dalit Basti hemlet where it exists (For electrification through Non-Conventional Energy Sources a
Distribution Transformer may not be necessary)
14 All India Coal consumption for Power Generation (MT)
520
Average Revenue Realization(paiseunit)
518
Year
ii) Electricity is provided to Public places like Schools Panchayat Office Health Centre Dispensaries Community
Centres etc and
iv) Mandatory Certification from Gram Panchayat regarding the completion of village electrification should be
obtained
13 Average cost of Power amp Average Realisation
iii) The number of households electrified should be at least 10 of the total number of households in the village
SN Contents Page
1 Capacity Addition Targets and Achievements in 12th Plan amp upto March2019 12
2 Capacity Addition Targets amp Achievements during Apr-2019 and Apr-19 to Apr-19 13
3 Installed Capacity in various Regions including their shares 14-19
Section B - Capacity Addition
(i) CAPACITY ADDTION TARGETS AND ACHIEVEMENTS IN THE 12TH PLAN Figures in MW
TARGET ACH TARGET ACH TARGET ACH TARGET ACH
CENTRAL 14878 15869 6004 2584 5300 2000 26182 20453
STATE 13922 22201 1608 2276 0 0 15530 24477
PRIVATE 43540 53661 3285 619 0 0 46825 54280
ALL INDIA 72340 91730 10897 5479 5300 2000 88537 99209
(ii) CAPACITY ADDITION TARGET AND ACHIEVEMENT FOR 2017-18 (IN MW)
THERMAL HYDRO NUCLEAR
TARGET ACH TARGET ACH TARGET ACH TARGET ACH
CENTRAL 4880 3170 800 390 500 6180 3560
STATE 3546 1760 300 200 0 3846 1960
PRIVATE 2940 3780 205 205 0 3145 3985
ALL INDIA 11366 8710 1305 795 500 0 13171 9505
(iii) CAPACITY ADDITION ACHIEVEMENT FOR 2018-19 (IN MW)
TARGET ACH TARGET ACH TARGET ACH TARGET ACH
CENTRAL 2760 1960 710 110 0 0 3470 2070
STATE 4506 2850 130 30 0 0 4636 2880
PRIVATE 0 972 0 0 0 0 0 972
ALL INDIA 7266 5782 840 140 0 0 8106 5922
12
SECTOR
SECTOR
TOTAL
TOTALNUCLEARHYDROTHERMAL
1 Capacity Addtion Targets and Achievements in the 12th Plan amp upto March2019
SECTORTHERMAL HYDRO NUCLEAR TOTAL
(MW)
Cummulative
Deviation
Target Achievement Target Achievement (+) (-)
Central 6040 500 0 500 0 -500
State 425615 660 0 660 0 -660
Private 0 0 0 0 0 0
Total 1029615 1160 0 1160 0 -1160
Central 600 0 0 0 0 0
State 21099 0 0 0 0 0
Private 379 0 0 0 0 0
Total 118999 0 0 0 0 0
Nuclear Central 700 0 0 0 0 0
Central 7340 500 0 500 0 -500
State 446714 660 0 660 0 -660
Private 379 0 0 0 0 0
Total 1218614 1160 0 1160 0 -1160
Electricity Generation (MU) Targets and Achievements for 2016-17
13
Hydro
All India
Capacity Addition TargetsAchievements during the Month of Apr-2019
Thermal
2 Capacity Addition Targets Achievements During Apr-2019
Schemes Sector
Target 2019-20
Apr-19 to Apr-19Apr-19
11
60
0 0
11
60
0 0 0 0
0
200
400
600
800
1000
1200
1400
Thermal Hydro Nuclear Total
MW
Targets and Achievement during 2019-20Target Achievement
0
200
400
600
800
1000
1200
Thermal Hydro Nuclear Total
1160
0 0
1160
0 0 00
MW
Target Achievement
Coal Lignite Gas Diesel Total
State 1634400 25000 287920 000 1947320 000 869755 69956 2887031
Private 2168083 108000 55800 000 2331883 000 251400 1312046 3895329
Central 1233537 25000 234406 000 1492943 162000 849622 37900 2542465
Sub Total 5036020 158000 578126 000 5772146 162000 1970777 1419902 9324825
State 2156000 104000 284982 000 2544982 000 544650 54789 3144421
Private 3474567 50000 467600 000 3992167 000 48100 2186476 6226743
Central 1650295 000 328067 000 1978362 184000 162000 66630 2390992
Sub Total 7280862 154000 1080649 000 8515511 184000 754750 2307894 11762155
State 1993250 000 79198 28788 2101236 000 1177483 58688 3337407
Private 1187450 25000 532210 27370 1772030 000 000 3749140 5521170
Central 1123502 289000 35958 000 1448460 332000 000 54190 1834650
Sub Total 4304202 314000 647366 56158 5321726 332000 1177483 3862018 10693227
State 624000 000 10000 000 634000 000 353792 27511 1015303
Private 638700 000 000 000 638700 000 39900 111637 790237
Central 1483664 000 000 000 1483664 000 100520 1000 1585184
Sub Total 2746364 000 10000 000 2756364 000 494212 140148 3390724
State 000 000 49771 3600 53371 000 42200 23325 118895
Private 000 000 2450 000 2450 000 000 6104 8554
Central 77002 000 125360 000 202362 000 100500 3000 305862
Sub Total 77002 000 177581 3600 258183 000 142700 32429 433311
State 000 000 000 4005 4005 000 000 525 4530
Private 000 000 000 000 000 000 000 738 738
Central 000 000 000 000 000 000 000 510 510
Sub Total 000 000 000 4005 4005 000 000 1773 5778
State 6407650 129000 711871 36393 7284913 000 2987880 234793 10507586
Private 7468800 183000 1058060 27370 8737230 000 339400 7366140 16442770
Central 5568000 314000 723791 000 6605791 678000 1212642 163230 8659663
Total 19444450 626000 2493722 63763 22627934 678000 4539922 7764163 35610019
Figures at decimal may not tally due to rounding off
Note -
(As per latest information available with MNRE)
Break up of RES all India as on 31032019 is given below (in MW)
459315 3562597 2818071 7764163
A 0 MW
B Apr 2019 0 MW
C
Apr 2019 0 MW
D Net Capacity Added during Apr 2019 A-B-C 0 MW
Sector wise breakup of RES capacity as shown is provisional
Share of installed capacity of BBMB Stations is included in state sector of partner states
BM PowerCogen Waste to Energy
910350 13830
Capacity Added during Apr 2019
Capacity Retired during
Capacity removed due to change
from Conventional to RES during
Islands
ALL INDIA
Abbreviation- SHP=Small Hydro Project (le 25 MW) BP=Biomass Power UampI=Urban amp Industrial Waste Power RES=Renewable Energy Sources
1 RES include SHP BP UampI Solar and Wind Energy Installed capacity in respect of RES (MNRE) as on 31032019
Small
Hydro PowerWind Power
Bio-PowerSolar Power
Total
Capacity
RES
(MNRE)
Northern Region
Western Region
Southern Region
Eastern Region
North Eastern
Region
ALL INDIA INSTALLED CAPACITY (IN MW) OF POWER STATIONS
(As on 30042019)
(UTILITIES)
Region Ownership Sector
Mode wise breakup
Grand TotalThermalNuclear Hydro
Coal Lignite Gas Diesel Total
State 13500 000 180040 000 193540 000 000 000 193540
Private 86922 000 10800 000 97722 000 000 17889 115611
Central 311272 000 20701 000 331973 10283 72309 000 414565
Sub-Total 411694 000 211541 000 623235 10283 72309 17889 723716
State 272000 000 15000 000 287000 000 110282 6930 404212
Private 408078 000 000 000 408078 000 20000 34512 462590
Central 129472 000 53561 000 183034 10094 66370181 500 259998
Sub-Total 809550 000 68561 000 878112 10094 196652 41942 1126799
State 000 000 000 000 000 000 69460 25661 95121
Private 000 000 000 000 000 000 99200 62668 161868
Central 18340 000 6201 000 24541 2895 122388 000 149824
Sub-Total 18340 000 6201 000 24541 2895 291048 88329 406813
State 000 000 17500 000 17500 000 123000 12903 153403
Private 000 000 000 000 000 000 000 6483 6483
Central 50639 000 12907 000 63547 6798 109188 000 179533
Sub-Total 50639 000 30407 000 81047 6798 232188 19386 339419
State 176000 000 15000 000 191000 000 259770 12780 463550
Private 511550 000 000 000 511550 000 28800 115462 655812
Central 85458 000 26401 000 111859 19681 92342 000 223882
Sub-Total 773008 000 41401 000 814409 19681 380912 128242 1343244
State 626000 25000 60380 000 711380 000 109618 2385 823383
Private 280200 108000 000 000 388200 000 10400 730181 1128781
Central 95625 25000 22110 000 142735 55674 73901 34400 306710
Sub-Total 1001825 158000 82490 000 1242315 55674 193919 766966 2258874
State 546900 000 000 000 546900 000 72410 2510 621820
Private 871433 000 000 000 871433 000 84200 288760 1244393
Central 379639 000 54949 000 434588 28948 180253 3000 646789
Sub-Total 1797972 000 54949 000 1852921 28948 336863 294270 2513002
State 000 000 000 000 000 000 125215 6787 132002
Private 9900 000 45000 000 54900 000 8800 52620 116320
Central 34324 000 6966 000 41290 3124 47554 000 91968
Sub-Total 44224 000 51966 000 96190 3124 181569 59407 340290
State 000 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 000 3471 3471
Central 3815 000 1503 000 5317 801 10171 000 16289
Sub-Total 3815 000 1503 000 5317 801 10171 3471 19760
124953 000 29105 000 154058 23703 75145 000 252907
State 1634400 25000 287920 000 1947320 000 869755 69956 2887031
Private 2168083 108000 55800 000 2331883 000 251400 1312046 3895329
Central 1233537 25000 234406 000 1492943 162000 849622 37900 2542465
Grand Total 5036020 158000 578126 000 5772146 162000 1970777 1419902 9324825
Delhi
Haryana
Himachal Pradesh
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
NORTHERN REGION
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
(As on 30042019)
State Ownership Sector
Mode wise breakup
Grand TotalThermalNuclear Hydro
RES
(MNRE)
Jammu amp Kashmir
Punjab
Rajasthan
Uttar Pradesh
Uttarakhand
Chandigarh
Central - Unallocated
Total (Northern
Region)
(As on 30042019)
Coal Lignite Gas Diesel Total
State 000 000 000 000 000 000 000 005 005
Private 000 000 4800 000 4800 000 000 392 5192
Central 46959 000 1967 000 48926 2600 000 000 51526
Sub-Total 46959 000 6767 000 53726 2600 000 397 56723
State 000 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 000 1447 1447
Central 14141 000 4334 000 18475 700 000 000 19175
Sub-Total 14141 000 4334 000 18475 700 000 1447 20622
State 371000 104000 217782 000 692782 000 77200 6470 776452
Private 726567 50000 396000 000 1172567 000 000 833180 2005747
Central 324243 000 42400 000 366643 55900 000 24330 446873
Sub-Total 1421810 154000 656182 000 2231992 55900 77200 863980 3229072
State 540000 000 000 000 540000 000 170366 8396 718762
Private 617400 000 10000 000 627400 000 000 418040 1045440
Central 334238 000 25700 000 359938 27300 152000 30000 569238
Sub-Total 1491638 000 35700 000 1527338 27300 322366 456436 2333440
State 228000 000 000 000 228000 000 12000 1105 241105
Private 885000 000 000 000 885000 000 000 52430 937430
Central 211075 000 000 000 211075 4800 10000 000 225875
Sub-Total 1324075 000 000 000 1324075 4800 22000 53535 1404410
State 1017000 000 67200 000 1084200 000 285084 38813 1408097
Private 1245600 000 56800 000 1302400 000 48100 880441 2230941
Central 466780 000 227273 000 694053 69000 000 12300 775353
Sub-Total 2729380 000 351273 000 3080653 69000 333184 931553 4414390
State 000 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 000 546 546
Central 19560 000 6634 000 26194 900 000 000 27094
Sub-Total 19560 000 6634 000 26194 900 000 546 27640
233300 000 19759 000 253059 22800 000 000 275859
State 2156000 104000 284982 000 2544982 000 544650 54789 3144421
Private 3474567 50000 467600 000 3992167 000 48100 2186476 6226743
Central 1650295 000 328067 000 1978362 184000 162000 66630 2390992
Grand Total 7280862 154000 1080649 000 8515511 184000 754750 2307894 11762155
Goa
Daman amp Diu
Gujarat
Madhya Pradesh
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
WESTERN REGION
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
ThermalNuclear Hydro
RES
(MNRE)
State Ownership Sector
Mode wise breakup
Grand Total
Chhattisgarh
Maharashtra
Dadra amp Nagar
Naveli
Central - Unallocated
Total (Western
Region)
(As on 30042019)
Coal Lignite Gas Diesel Total
State 501000 000 23540 000 524540 000 167360 5618 697518
Private 387388 000 381318 3680 772386 000 000 743342 1515728
Central 154683 12773 000 000 167456 12727 000 25000 205183
Sub-Total 1043071 12773 404858 3680 1464382 12727 167360 773960 2418429
State 558250 000 000 000 558250 000 247993 4122 810365
Private 83945 000 83182 000 167127 000 000 393644 560771
Central 180685 14927 000 000 195612 14873 000 1000 211485
Sub-Total 822880 14927 83182 000 920989 14873 247993 398766 1582621
State 502000 000 000 12792 514792 000 358660 19389 892841
Private 195850 000 000 2520 198370 000 000 1363591 1561961
Central 242780 40140 000 000 282920 69800 000 000 352720
Sub-Total 940630 40140 000 15312 996082 69800 358660 1382979 2807521
State 000 000 000 15996 15996 000 185650 17290 218936
Private 61500 000 17400 000 78900 000 000 19021 97921
Central 86142 28180 35958 000 150280 36200 000 5000 191480
Sub-Total 147642 28180 53358 15996 245176 36200 185650 41311 508337
State 432000 000 52408 000 484408 000 217820 12270 714498
Private 458767 25000 50310 21170 555247 000 000 1229228 1784475
Central 302532 136420 000 000 438952 144800 000 23190 606942
Sub-Total 1193299 161420 102718 21170 1478607 144800 217820 1264688 3105915
State 000 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 000 000 000
Central 000 10000 000 000 10000 000 000 000 10000
Sub-Total 000 10000 000 000 10000 000 000 000 10000
State 000 000 3250 000 3250 000 000 000 3250
Private 000 000 000 000 000 000 000 314 314
Central 14080 10760 000 000 24840 8600 000 000 33440
Sub-Total 14080 10760 3250 000 28090 8600 000 314 37004
142600 35800 000 000 178400 45000 000 000 223400
State 1993250 000 79198 28788 2101236 000 1177483 58688 3337407
Private 1187450 25000 532210 27370 1772030 000 000 3749140 5521170
Central 1123502 289000 35958 000 1448460 332000 000 54190 1834650
Grand Total 4304202 314000 647366 56158 5321726 332000 1177483 3862018 10693227
Kerala
Andhra Pradesh
Telangana
Karnataka
Total (Southern
Region)
Tamil Nadu
NLC
Puducherry
Central - Unallocated
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
SOUTHERN REGION
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
State Ownership Sector
Mode wise breakup
Grand TotalThermalNuclear Hydro
RES
(MNRE)
(As on 30042019)
Coal Lignite Gas Diesel Total
State 000 000 000 000 000 000 000 7070 7070
Private 28100 000 000 000 28100 000 000 25545 53645
Central 384933 000 000 000 384933 000 11000 000 395932
Sub-Total 413033 000 000 000 413033 000 11000 32615 456647
State 42000 000 000 000 42000 000 13000 405 55405
Private 73000 000 000 000 73000 000 000 3495 76495
Central 39374 000 000 000 39374 000 6100 000 45474
Sub-Total 154374 000 000 000 154374 000 19100 3900 177374
State 540000 000 10000 000 550000 000 98600 12195 660795
Private 243700 000 000 000 243700 000 000 35250 278950
Central 76077 000 000 000 76077 000 41000 000 117077
Sub-Total 859777 000 10000 000 869777 000 139600 47445 1056822
State 000 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 000 000 000
Central 698504 000 000 000 698504 000 18620 000 717124
Sub-Total 698504 000 000 000 698504 000 18620 000 717124
State 42000 000 000 000 42000 000 206192 2630 250822
Private 293900 000 000 000 293900 000 000 47346 341246
Central 163390 000 000 000 163390 000 8900 1000 173290
Sub-Total 499290 000 000 000 499290 000 215092 50976 765358
State 000 000 000 000 000 000 36000 5211 41211
Private 000 000 000 000 000 000 39900 001 39901
Central 8703 000 000 000 8703 000 6400 000 15103
Sub-Total 8703 000 000 000 8703 000 82300 5212 96215
112683 000 000 000 112683 000 8501 000 121184
State 624000 000 10000 000 634000 000 353792 27511 1015303
Private 638700 000 000 000 638700 000 39900 111637 790237
Central 1483664 000 000 000 1483664 000 100520 1000 1585184
Grand Total 2746364 000 10000 000 2756364 000 494212 140148 3390724
Total (Eastern
Region)
Bihar
Jharkhand
West Bengal
DVC
Odisha
Sikkim
Central - Unallocated
HydroOwnership Sector
Mode wise breakup
Grand TotalThermalNuclear
RES
(MNRE)
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
State
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
EASTERN REGION
(As on 30042019)
Coal Lignite Gas Diesel Total
State 000 000 32821 000 32821 000 10000 501 43322
Private 000 000 2450 000 2450 000 000 2650 5100
Central 40852 000 43556 000 84408 000 35708 2500 122616
Sub-Total 40852 000 78827 000 119679 000 45708 5651 171038
State 000 000 000 000 000 000 000 10711 10711
Private 000 000 000 000 000 000 000 2939 2939
Central 3705 000 4682 000 8387 000 11655 000 20042
Sub-Total 3705 000 4682 000 8387 000 11655 13650 33692
State 000 000 000 000 000 000 32200 3253 35453
Private 000 000 000 000 000 000 000 012 012
Central 4560 000 10969 000 15529 000 7227 000 22756
Sub-Total 4560 000 10969 000 15529 000 39427 3265 58221
State 000 000 16950 000 16950 000 000 1601 18551
Private 000 000 000 000 000 000 000 009 009
Central 5610 000 43695 000 49305 000 6849 500 56654
Sub-Total 5610 000 60645 000 66255 000 6849 2110 75214
State 000 000 000 3600 3600 000 000 545 4145
Private 000 000 000 000 000 000 000 344 344
Central 4710 000 7157 000 11867 000 9534 000 21401
Sub-Total 4710 000 7157 3600 15467 000 9534 889 25890
State 000 000 000 000 000 000 000 3067 3067
Private 000 000 000 000 000 000 000 100 100
Central 3210 000 4893 000 8103 000 5733 000 13836
Sub-Total 3210 000 4893 000 8103 000 5733 3167 17003
State 000 000 000 000 000 000 000 3647 3647
Private 000 000 000 000 000 000 000 050 050
Central 3105 000 4046 000 7151 000 9794 000 16945
Sub-Total 3105 000 4046 000 7151 000 9794 3697 20642
11250 000 6362 000 17612 000 14000 000 31612
State 000 000 49771 3600 53371 000 42200 23325 118895
Private 000 000 2450 000 2450 000 000 6104 8554
Central 77002 000 125360 000 202362 000 100500 3000 305862
Grand Total 77002 000 177581 3600 258183 000 142700 32429 433311
Assam
Arunachal Pradesh
Meghalaya
Tripura
Manipur
Nagaland
Mizoram
Central - Unallocated
Total (North-
Eastern Region)
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
NORTH-EASTERN REGION
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
State Ownership Sector
Mode wise breakup
Grand TotalThermalNuclear Hydro
RES
(MNRE)
(As on 30042019)
Coal Lignite Gas Diesel Total
State 000 000 000 4005 4005 000 000 525 4530
Private 000 000 000 000 000 000 000 663 663
Central 000 000 000 000 000 000 000 510 510
Sub-Total 000 000 000 4005 4005 000 000 1698 5703
State 000 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 000 075 075
Central 000 000 000 000 000 000 000 000 000
Sub-Total 000 000 000 000 000 000 000 075 075
State 000 000 000 4005 4005 000 000 525 4530
Private 000 000 000 000 000 000 000 738 738
Central 000 000 000 000 000 000 000 510 510
Grand Total 000 000 000 4005 4005 000 000 1773 5778
Andaman amp
Nicobar
Lakshadweep
Total (Islands)
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
ISLANDS
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
State Ownership Sector
Mode wise breakup
Grand TotalThermalNuclear Hydro
RES
(MNRE)
SrNo Contents Page
1 Executive summary of Target and Achievement of Transmission Lines during 2019-20
20(1)
2 List of Transmission Lines CommissionedReady for commissioning during Apr-2019 20(2)
Section C - Transmission Lines
1 Executive summary of Target and Achievement of Transmission Lines during 2019-20 As on 30-04-19
(All figures in circuit kms)
Ce
ntr
al S
ecto
r
Sta
te S
ecto
r
JV
Pri
va
te S
ecto
r
To
tal
Ce
ntr
al S
ecto
r
Sta
te S
ecto
r
JV
Pri
va
te S
ecto
r
To
tal
Ce
ntr
al S
ecto
r
Sta
te S
ecto
r
JV
Pri
va
te S
ecto
r
To
tal
Ce
ntr
al S
ecto
r
Sta
te S
ecto
r
JV
Pri
va
te S
ecto
r
To
tal
Ce
ntr
al S
ecto
r
Sta
te S
ecto
r
JV
Pri
va
te S
ecto
r
To
tal
Ce
ntr
al
Se
cto
r
Sta
te S
ec
tor
JV
Pri
va
te S
ec
tor
Gra
nd
To
tal
0 0 0 0 0 0 0 0 2727 958 2334 6019 2239 3416 1143 6798 781 10023 0 10804 5747 14397 3477 23621
Apr19 Programme 0 0 0 0 0 0 0 0 577 416 557 1550 60 890 203 1153 0 309 0 309 637 1615 760 3012
Achievement 0 0 0 0 0 0 0 0 53 0 0 53 0 20 0 20 0 401 0 401 53 421 0 474
Upto Apr-19 Programme 0 0 0 0 0 0 0 0 577 416 557 1550 60 890 203 1153 0 309 0 309 637 1615 760 3012
Achievement 0 0 0 0 0 0 0 0 53 0 0 53 0 20 0 20 0 401 0 401 53 421 0 474
20(1)
220 kV Grand Total 800 kV 500 kV
Programme 2019-20
Programme
Achievement
HVDC765 kV 400 kV
Line
1 2 3 4 5 6
1 400 Bhadla (PG) - Bhadla (RVPN) line DC PGCIL 53
53
2 400 LILO of one ckt Jhanor - Navsari at Vav Ss DC GETCO 20
3 220 Banda-Chitrakoot Line DC UPPTCL 226
4 220 Gorakhpur (PG)-Gola line DC UPPTCL 82
5 220 Hapur(765) - Faridnagar line SC UPPTCL 11
6 220 Kalikiri - Madanapalli line DC APTRANSCO 60
7 220LILO of Gr Noida -Noida Sec-129 at Noida
Sec-148DC UPPTCL 1
8 220LILO of one Ckt of Badshahpur Pali at Sec-
65 GurgaonDC HVPNL 3
9 220 Sultanpur-Sangipur LILO Section at Amethi DC UPPTCL 18
421
0
474
20(2)
Grand Total
2Transmission Lines (220 kV and above) CommissionedReady for commissioning During Apr-2019
Voltage
Level (kV)Name of Transmission Lines
Circuit
Type
Executing
Agency
CENTRAL SECTOR
Total of CENTRAL SECTOR
STATE SECTOR Sector
Total of STATE SECTOR
PRIVATE SECTOR
Total of PRIVATE SECTOR
SlNo
Length(CKm)
As on 30-04-19
SN Contents Page
1 Executive summary of Target and Achievement of Substations during 2019-20 21(1)
2Sub Stations (220 kV and above) commissionedready for commisssioning during Apr-
201921(2)
Section D - Sub Stations
1 Executive summary of Target and Achievement of Substations during 2019-2020 As on 30-04-19
(All figures in circuit MVA)
Ce
ntr
al S
ecto
r
Sta
te S
ecto
r
JV
Pri
va
te S
ecto
r
To
tal
Ce
ntr
al S
ecto
r
Sta
te S
ecto
r
JV
Pri
va
te S
ecto
r
To
tal
Ce
ntr
al S
ecto
r
Sta
te S
ecto
r
JV
Pri
va
te S
ecto
r
To
tal
Ce
ntr
al S
ecto
r
Sta
te S
ecto
r
JV
Pri
va
te S
ecto
r
To
tal
Ce
ntr
al S
ecto
r
Sta
te S
ecto
r
JV
Pri
va
te S
ecto
r
To
tal
Ce
ntr
al S
ec
tor
Sta
te S
ec
tor
JV
Pri
va
te S
ec
tor
Gra
nd
To
tal
3000 0 0 3000 0 0 0 0 18000 3000 6000 27000 5205 19665 4260 29130 800 21786 0 22586 27005 44451 10260 81716
Apr19 Programme 0 0 0 0 0 0 0 0 3000 0 3000 6000 0 1000 2000 3000 0 800 0 800 3000 1800 5000 9800
Achievement 0 0 0 0 0 0 0 0 500 0 0 500 815 1980 0 2795 0 1305 0 1305 1315 3285 0 4600
Upto Apr-19 Programme 0 0 0 0 0 0 0 0 3000 0 3000 6000 0 1000 2000 3000 0 800 0 800 3000 1800 5000 9800
Achievement 0 0 0 0 0 0 0 0 500 0 0 500 815 1980 0 2795 0 1305 0 1305 1315 3285 0 4600
21(1)
220 kV Grand Total 800 kV 500 kV
Programme 2019-20
Programme
Achievement
HVDC765 kV 400 kV
As on 30-04-19
Sl Voltage Ratio Capacity
No (kVkV) (MWMVA)
1 2 3 4 5
1 Bhadla SS (3x1500 3x500 MVA) 765400 PGCIL 500
2 Extn at Tumkur (Pavagada ) PS (2x500 MVA) 400220 PGCIL 500
3 Bongaigaon (2nd ICT) Ss 400220 PGCIL 315
Total of CENTRAL SECTOR 1315
4 Motiram Adda Gorakhpur (Aug) (Additional TF) 400220 UPPTCL 240
5 Muradnagar-II Ghaziabad (Aug) (Additional TF) 400220 UPPTCL 240
6 Noida Sec- 148 GBNagar (New) 400220 UPPTCL 5007 Sarnath Varanasi (Aug) TF- II (500-315) 400220 UPPTCL 1858 Sarojininagar Lucknow Aug) TF- II (500-315) 400220 UPPTCL 185
9 Unnao (Aug) TF-III 400220 UPPTCL 31510 Nawada SS 400220 HVPNL 31511 Kharepatan SS 22033 MSETCL 2512 Prathipadu SS 220132 APTRANSCO 10013 Pali Ss 22066 HVPNL 160
14 A-5 Faridabad Ss 22066 HVPNL 60
15 Rentachintala Ss Aug(3X100-2x100) 220132 APTRANSCO 10016 Amethi Ss 220132 UPPTCL 160
17 Gajokhar Varanasi (Aug) TF- II (160-100) 220132 UPPTCL 60
18 Gola Gorakhpur (New) 220132 UPPTCL 160
19 Khurja Bulandshahr (Aug) TF- II (200-160) 220132 UPPTCL 40
20 RC Green GB Nagar (Aug) TF-II (160-100) 220132 UPPTCL 60
21 Sikandrabad Bulandshahr (Aug) (Additional TF) 220132 UPPTCL 160
22 Sitapur (Aug) (Additional TF) 220132 UPPTCL 160
23 Sohawal Ayodhya (Aug) TF-II (160-100) 220132 UPPTCL 60
TOTAL STATE SECTOR 3285
GRAND TOTAL 4600
21(2)
CENTRAL SECTOR
STATE SECTOR
2Sub-Stations (220 kV and above) CommissionedReady for commissioning During Apr-2019
Name of Sub Stations Executing Agency
SN Contents Page
1 Electricity Generation (MU) Targets and Achievements for 2019-20 22
Section E - Electricity Generation
Programme Achievement Ach Programme Achievement Ach
Central Sector 37545100 3177900 3129530 9848 3177900 3129530 9848
State Sector 37498600 3322500 2950558 8881 3322500 2950558 8881
PvtIPP Sector 37346200 3236400 3195940 9875 3236400 3195940 9875
PvtUTL Sector 1823100 159300 165579 10394 159300 165579 10394
Total 114213000 9896100 9441607 9541 9896100 9441607 9541
Central Sector 5661700 386100 481390 12468 386100 481390 12468
State Sector 6680500 498200 536514 10769 498200 536514 10769
PvtIPP Sector 1206900 57300 80405 14032 57300 80405 14032
PvtUTL Sector 144100 12300 10930 8886 12300 10930 8886
Total 13693200 953900 1109239 11628 953900 1109239 11628
Central Sector 4472000 367300 317765 8651 367300 317765 8651
Total 4472000 367300 317765 8651 367300 317765 8651
Bhutan Import 621800 17500 24396 13941 17500 24396 13941
Central Sector 47678800 3931300 3928685 9993 3931300 3928685 9993
State Sector 44179100 3820700 3487072 9127 3820700 3487072 9127
Pvt Sector 40520300 3465300 3452854 9964 3465300 3452854 9964
Total 133000000 11234800 10893007 9696 11234800 10893007 9696
Provisional based on actual-cum-Assesment
Figs in MU
Cummulative
Achievement
Cummulative
Achievement
Mar-19 Mar-18 Upto Mar-2019 Upto Mar-2018
984785 869291 12675910 10183949
22
1 Electricity Generation (MU) Targets and Achievememts for 2019-20
All India Energy Generation During Apr-19 to Apr-19 (MU)
Target (2019-20)Apr-19 to Apr-19
Sector
Hydro
Thermal
Nuclear
Renewable Energy Generation
Achievement
Apr-2019
98961
95393673
112348
94416
11092
3178
108930
0
20000
40000
60000
80000
100000
120000
Thermal Hydro Nuclear Total
Programme
Achievement
SN Contents Page
1 Energy Power Supply Position (Provisional) for Apr-2019 and during Apr-19 to Apr-19 23
2 Peak Power Supply Position (Provisional) for Apr-2019 and during Apr-19 to Apr-19 24
3 Energy Power Supply Position (Revised) for Mar-2019 and during Apr-19 to Mar-19 25
4 Peak Power Supply Position (Revised) for Mar-2019 and during Apr-19 to Mar-19 26
5 Notified Power cuts Restrictions on Industries during Apr-2019 27
6 Power Supply to Agricultural Sector during Apr-2019 28
Section F - Power supply position
आकड़ मममलयन यननट नट Figures in MU net
ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied
कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )
चडीगढ़ Chandigarh 117 117 0 00 117 117 0 00
दिलली Delhi 2698 2698 1 00 2698 2698 1 00
हरियजणज Haryana 3773 3773 0 00 3773 3773 0 00
दहमजचल परिश Himachal Pradesh 777 777 0 00 777 777 0 00
रमम कशमीि Jammu amp Kashmir 1604 1296 308 192 1604 1296 308 192
परजब Punjab 3646 3646 0 00 3646 3646 0 00
िजरसथजन Rajasthan 6210 6208 2 00 6210 6208 2 00
उतति परिश Uttar Pradesh 10179 10148 32 03 10179 10148 32 03
उततिजखड Uttarakhand 1120 1120 0 00 1120 1120 0 00
उततरी कषतर Northern Region 30094 29786 308 10 30094 29786 308 10
छततीसगढ़ Chhattisgarh 2684 2676 8 03 2684 2676 8 03
गरिजत Gujarat 10718 10718 0 00 10718 10718 0 00
मधय परिश Madhya Pradesh 6006 6006 0 00 6006 6006 0 00
महजिजषटर Maharashtra 14308 14308 0 00 14308 14308 0 00
िमन औि दिउ Daman amp Diu 220 220 0 00 220 220 0 00
िजिि व नगि हवली Dadra amp Nagar Haveli 552 552 0 00 552 552 0 00
गोवज Goa 388 388 0 00 388 388 0 00
पशचिमी कषतर Western Region 34875 34868 8 00 34875 34868 8 00
आनधर परिश Andhra Pradesh 5708 5708 0 00 5708 5708 0 00
तलगजनज Telangana 5725 5725 0 00 5725 5725 0 00
कनजाटक Karnataka 7003 7003 0 00 7003 7003 0 00
किल Kerala 2402 2400 2 01 2402 2400 2 01
तममल नजड Tamil Nadu 10010 10010 0 00 10010 10010 0 00
पडचिी Puducherry 263 263 0 00 263 263 0 00
लकष-दवीप Lakshadweep 4 4 0 0 4 4 0 0
दकषकषणी कषतर Southern Region 31111 31109 2 00 31111 31109 2 00
बबहजि Bihar 2589 2589 0 00 2589 2589 0 00
िजमोिि घजटी ननगम DVC 1772 1772 0 00 1772 1772 0 00
झजिखणड Jharkhand 689 689 0 00 689 689 0 00
ओडडशज Odisha 2689 2689 1 00 2689 2689 1 00
पशशचम बगजल West Bengal 5075 5075 0 00 5075 5075 0 00
मसशककम Sikkim 37 37 0 00 37 37 0 00
अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 7 29 27 2 7
परवी कषतर Eastern Region 12851 12850 1 00 12851 12850 1 00
अरणजचल परिश Arunachal Pradesh 66 66 0 05 66 66 0 05
असम Assam 766 709 57 75 766 709 57 75
मणणपि Manipur 68 67 1 15 68 67 1 15
मघजलय Meghalaya 170 160 10 59 170 160 10 59
ममज़ोिम Mizoram 54 53 0 08 54 53 0 08
नजगजलड Nagaland 54 54 0 08 54 54 0 08
बिपिज Tripura 122 120 1 12 122 120 1 12
उततर-परवी कषतर North-Eastern Region 1300 1228 71 55 1300 1228 71 55
समपणण भारत All India 110231 109842 389 04 110231 109842 389 04
23
ऊरजा पनत ा म कमी ऊरजा पनत ा म कमीEnergy not Supplied
Excludes energy exported to Bangladesh
Energy not Supplied
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
ऊराण वरवदयत आपरत ण शथिरत ररपोरण (परवाणरवलोकन) Energy Power Supply Position Report (Provisional)
राजयState
अपरल 2019 April2019 अपरल2019 -अपरल2019 April2019 to April2019
अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met
कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )
चडीगढ़ Chandigarh 256 256 0 00 256 256 0 00
दिलली Delhi 5664 5664 0 00 5664 5664 0 00
हरियजणज Haryana 8127 8127 0 00 8127 8127 0 00
दहमजचल परिश Himachal Pradesh 1387 1387 0 00 1387 1387 0 00
रमम कशमीि Jammu amp Kashmir 2826 2261 565 200 2826 2261 565 200
परजब Punjab 7015 7015 0 00 7015 7015 0 00
िजरसथजन Rajasthan 10560 10560 0 00 10560 10560 0 00
उतति परिश Uttar Pradesh 19935 19935 0 00 19935 19935 0 00
उततिजखड Uttarakhand 1922 1922 0 00 1922 1922 0 00
उततरी कषतर Northern Region 54476 53985 491 09 54476 53985 491 09
छततीसगढ़ Chhattisgarh 4596 4574 22 05 4596 4574 22 05
गरिजत Gujarat 17871 17865 6 00 17871 17865 6 00
मधय परिश Madhya Pradesh 10018 10018 0 00 10018 10018 0 00
महजिजषटर Maharashtra 23158 23150 8 00 23158 23150 8 00
िमन औि दिउ Daman amp Diu 341 340 1 02 341 340 1 02
िजिि व नगि हवली Dadra amp Nagar Haveli 818 818 0 00 818 818 0 00
गोवज Goa 594 594 0 00 594 594 0 00
पशचिमी कषतर Western Region 56242 56222 20 00 56242 56222 20 00
आनधर परिश Andhra Pradesh 9151 9151 0 00 9151 9151 0 00
तलगजनज Telangana 10191 10191 0 00 10191 10191 0 00
कनजाटक Karnataka 12681 12681 0 00 12681 12681 0 00
किल Kerala 4309 4300 8 02 4309 4300 8 02
तममल नजड Tamil Nadu 15972 15972 0 00 15972 15972 0 00
पडचिी Puducherry 482 480 2 05 482 480 2 05
लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0
दकषकषणी कषतर Southern Region 49155 49103 52 01 49155 49103 52 01
बबहजि Bihar 5357 5357 0 00 5357 5357 0 00
िजमोिि घजटी ननगम DVC 3039 3039 0 00 3039 3039 0 00
झजिखणड Jharkhand 1266 1266 0 00 1266 1266 0 00
ओडडशज Odisha 5389 5389 0 00 5389 5389 0 00
पशशचम बगजल West Bengal 8666 8666 0 00 8666 8666 0 00
मसशककम Sikkim 100 100 0 00 100 100 0 00
अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7
परवी कषतर Eastern Region 23349 23349 0 00 23349 23349 0 00
अरणजचल परिश Arunachal Pradesh 139 136 3 22 139 136 3 22
असम Assam 1712 1667 45 26 1712 1667 45 26
मणणपि Manipur 197 188 9 46 197 188 9 46
मघजलय Meghalaya 336 336 0 00 336 336 0 00
ममज़ोिम Mizoram 116 113 3 26 116 113 3 26
नजगजलड Nagaland 157 131 26 166 157 131 26 166
बिपिज Tripura 292 291 1 03 292 291 1 03
उततर-परवी कषतर North-Eastern Region 2848 2780 68 24 2848 2780 68 24
समपणण भारत All India 177411 176810 601 03 177411 176810 601 03
24
मजग की पनत ा म कमी Demand not Met
Excludes the supply to Bangladesh
राजयStateअपरल 2019 April2019
मजग की पनत ा म कमी Demand not Met
अधिकतम वरवदयत आपरत ण शथिरत ररपोरण (परवाणरवलोकन) Peak Power Supply Position Report (Provisional)
आकड़ मगज वजट नट Figures in MW netअपरल2019 -अपरल2019 April2019 to April2019
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
आकड़ मममलयन यननट नट Figures in MU net
ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied
कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )
चडीगढ़ Chandigarh 96 96 0 00 1561 1561 0 00
दिलली Delhi 1931 1930 1 00 32299 32282 17 01
हरियजणज Haryana 3658 3658 0 00 53665 53665 0 00
दहमजचल परिश Himachal Pradesh 832 830 2 02 9850 9618 232 24
रमम कशमीि Jammu amp Kashmir 1767 1414 353 200 19593 15868 3725 190
परजब Punjab 3585 3585 0 00 55288 55275 13 00
िजरसथजन Rajasthan 6774 6770 4 01 79826 79637 189 02
उतति परिश Uttar Pradesh 8754 8691 63 07 117101 116118 984 08
उततिजखड Uttarakhand 1067 1067 0 00 13845 13753 92 07
उततरी कषतर Northern Region 28464 28041 423 15 383028 377776 5251 14
छततीसगढ़ Chhattisgarh 2464 2457 8 03 26130 26076 54 02
गरिजत Gujarat 9890 9890 0 00 116588 116572 15 00
मधय परिश Madhya Pradesh 6236 6236 0 00 75667 75665 2 00
महजिजषटर Maharashtra 13631 13631 0 00 158285 158148 137 01
िमन औि दिउ Daman amp Diu 221 221 0 00 2557 2557 0 00
िजिि व नगि हवली Dadra amp Nagar Haveli 553 553 0 00 6317 6317 0 00
गोवज Goa 362 362 0 00 4283 4280 3 01
पशचिमी कषतर Western Region 33357 33349 8 00 389827 389615 212 01
आनधर परिश Andhra Pradesh 6072 6071 1 00 63735 63677 58 01
तलगजनज Telangana 6930 6929 1 00 66697 66635 62 01
कनजाटक Karnataka 7614 7612 1 00 71759 71690 69 01
किल Kerala 2489 2488 1 00 25029 24911 118 05
तममल नजड Tamil Nadu 10247 10245 2 00 109375 109273 102 01
पडचिी Puducherry 252 251 1 04 2761 2751 10 03
लकष-दवीप Lakshadweep 4 4 0 0 46 46 0 0
दकषकषणी कषतर Southern Region 33605 33597 8 00 339355 338938 417 01
बबहजि Bihar 2319 2318 1 00 30052 29827 225 07
िजमोिि घजटी ननगम DVC 1773 1772 1 00 22365 21995 369 17
झजिखणड Jharkhand 698 697 1 01 8682 8461 221 25
ओडडशज Odisha 2583 2582 1 00 31810 31781 30 01
पशशचम बगजल West Bengal 4585 4584 2 00 52237 52078 159 03
मसशककम Sikkim 41 41 0 00 513 512 0 01
अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 67 346 323 23 67
परवी कषतर Eastern Region 11999 11995 5 00 145658 144654 1004 07
अरणजचल परिश Arunachal Pradesh 61 60 0 06 864 855 9 10
असम Assam 680 656 23 34 9532 9204 328 34
मणणपि Manipur 68 68 1 09 916 906 10 11
मघजलय Meghalaya 173 173 0 03 1955 1953 1 01
ममज़ोिम Mizoram 50 49 0 09 668 661 8 12
नजगजलड Nagaland 58 57 1 20 902 809 93 103
बिपिज Tripura 150 150 0 00 1859 1837 21 11
उततर-परवी कषतर North-Eastern Region 1240 1214 26 21 16696 16225 471 28
समपणण भारत All India 108665 108196 469 04 1274564 1267209 7355 06
Note The revised data for March 2019 is not avaliable
Excludes energy exported to Bangladesh
राजयState
ऊराण वरवदयत आपरत ण शथिरत ररपोरण (परवाणरवलोकन) Energy Power Supply Position Report (Provisional)
25
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
Energy not Supplied Energy not Supplied
मािण2019 March2019 अपरल2018 -मािण2019 April2018 to March2019
ऊरजा पनत ा म कमी ऊरजा पनत ा म कमी
अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met
कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )
चडीगढ़ Chandigarh 223 223 0 00 369 369 0 00
दिलली Delhi 4016 4016 0 00 7016 7016 0 00
हरियजणज Haryana 6544 6544 0 00 10270 10270 0 00
दहमजचल परिश Himachal Pradesh 1683 1683 0 00 1700 1700 0 00
रमम कशमीि Jammu amp Kashmir 3277 2622 655 200 3277 2622 655 200
परजब Punjab 6564 6564 0 00 12638 12638 0 00
िजरसथजन Rajasthan 11885 11885 0 00 13276 13276 0 00
उतति परिश Uttar Pradesh 16220 16220 0 00 20498 20062 436 21
उततिजखड Uttarakhand 2002 2002 0 00 2216 2216 0 00
उततरी कषतर Northern Region 47925 47356 569 12 63166 61726 1440 23
छततीसगढ़ Chhattisgarh 4444 4128 316 71 4444 4270 174 39
गरिजत Gujarat 16263 16263 0 00 17053 16963 90 05
मधय परिश Madhya Pradesh 12328 12323 5 00 13815 13815 0 00
महजिजषटर Maharashtra 22361 22291 70 03 23864 23254 610 26
िमन औि दिउ Daman amp Diu 336 336 0 01 357 356 1 02
िजिि व नगि हवली Dadra amp Nagar Haveli 800 799 1 01 816 815 1 01
गोवज Goa 538 538 0 00 596 596 0 00
पशचिमी कषतर Western Region 53132 52965 167 03 56675 55821 853 15
आनधर परिश Andhra Pradesh 8977 8977 0 00 9459 9453 6 01
तलगजनज Telangana 10471 10471 0 00 10815 10815 0 00
कनजाटक Karnataka 12841 12841 0 00 12841 12841 0 00
किल Kerala 4264 4228 36 09 4264 4228 36 09
तममल नजड Tamil Nadu 15712 15712 0 00 15712 15712 0 00
पडचिी Puducherry 427 412 15 34 427 412 15 34
लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0
दकषकषणी कषतर Southern Region 49464 49464 0 00 49464 49464 0 00
बबहजि Bihar 4633 4633 0 00 5115 5084 31 06
िजमोिि घजटी ननगम DVC 3035 3035 0 00 3035 3035 0 00
झजिखणड Jharkhand 1210 1210 0 00 1339 1291 48 36
ओडडशज Odisha 4827 4827 0 00 5357 5357 0 00
पशशचम बगजल West Bengal 8287 8287 0 00 9130 9123 7 01
मसशककम Sikkim 100 100 0 00 106 106 0 00
अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7
परवी कषतर Eastern Region 21658 21658 0 00 23141 22733 408 18
अरणजचल परिश Arunachal Pradesh 133 131 2 15 138 138 0 01
असम Assam 1539 1508 31 20 1865 1809 56 30
मणणपि Manipur 204 199 5 25 219 216 3 12
मघजलय Meghalaya 357 357 0 00 374 372 1 04
ममज़ोिम Mizoram 108 105 3 28 121 119 2 17
नजगजलड Nagaland 127 125 2 16 156 138 18 116
बिपिज Tripura 249 249 0 00 298 293 5 17
उततर-परवी कषतर North-Eastern Region 2540 2535 5 02 2967 2850 117 39
समपणण भारत All India 169464 168745 719 04 177022 175528 1494 08
Note The revised data for March 2019 is not avaliable 26
अधिकतम वरवदयत आपरत ण शथिरत ररपोरण (परवाणरवलोकन) Peak Power Supply Position Report (Provisional)
आकड़ मगज वजट नट Figures in MW net
राजयStateमािण2019 March2019 अपरल2018 -मािण2019 April2018 to March2019
मजग की पनत ा म कमी मजग की पनत ा म कमी Demand not MetDemand not Met
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
Excludes the supply to Bangladesh
अपरल 2019 April2019 अपरल2018 -मािण2019 April2019 to April2019
उततरी कषतर Northern Region
चडीगढ़ Chandigarh(Data Not Received)दिलली Delhi
हरियजणज Haryana
दहमजचल परिश Himachal Pradeshरमम कशमीि Jammu amp Kashmir(Data
Not Received)परजब Punjab
िजरसथजन Rajasthanउतति परिश Uttar Pradesh
उततिजखड Uttarakhand
पशचिमी कषतर Western Region
छततीसगढ़ Chhattisgarh
Apr-Nov 2018- No cuts
Maximum Demand cut-58MW
Energy cut- 00020-00032 MUsday
गरिजत Gujarat
मधय परिश Madhya Pradesh
महजिजषटर Maharashtra
गोवज Goa
दकषकषणी कषतर Southern Region
आनधर परिश Andhra Pradesh
तलगजनज Telangana
कनजाटक Karnataka
किल Kerala
तममल नजड Tamil Nadu
पडचिी Puducherryपरवी कषतर Eastern Region
बबहजि Bihar
झजिखणड Jharkhand
ओडडशज Odisha
पशशचम बगजल West Bengal
No N
otifie
d Cu
ts
27
मािण 2019 म इडथरीर पर वरवदयत करौती का वरवरवरण Notified Power CutsRestrictions on Industries during April2019
राजय कषतर State Regionऊराणमाग करौती EnergyDemand Cut
No N
otifie
d Cu
tsNo
Notifie
d Cu
ts
अपरल2019 April 2019 अपरल2019 -अपरल2019 April2019 to April2019
उततरी कषतर Northern Region
चडीगढ़ Chandigarh Data not received Data not received
दिलली Delhi Data not received Data not received
हरियजणज Haryana 0811 hrsday 0811 hrsday
दहमजचल परिश Himachal Pradesh HPSEBL has only 2 agriculture consumers and uninterrupted
power is being supplied to agriculture sector
HPSEBL has only 2 agriculture consumers and uninterrupted
power is being supplied to agriculture sector
रमम कशमीि Jammu amp Kashmir Data not received Data not received
परजब Punjab 379 hrsday 379 hrsday
िजरसथजन Rajasthan 0630 hrsday 0630 hrsday
उतति परिश Uttar Pradesh 2157 hrsday 2157 hrsday
उततिजखड Uttarakhand 2359 hrsday 2359 hrsday
पशचिमी कषतर Western Region
छततीसगढ़ Chhattisgarh 18 hrsday 18 hrsday
गरिजत Gujarat 8 hrsday 8 hrsday
मधय परिश Madhya Pradesh Three-Phase Supply(Irrigation)- 0953 hrs day Three-Phase
(Mixed) Supply - 2334 hrs day
Three-Phase Supply(Irrigation)- 0953 hrs day Three-Phase
(Mixed) Supply - 2334 hrs day
महजिजषटर Maharashtra Three-Phase Supply(Irrigation)- 9 hrs day Three-Phase Supply(Irrigation)- 9 hrs day
गोवज Goa No restriction No restriction
दकषकषणी कषतर Southern Region
आनधर परिश Andhra Pradesh 07 hrsday 07 hrsday
तलगजनज Telangana 24 hrsday 24 hrsday
कनजाटक Karnataka 6 hrsday 6 hrsday
किल Kerala No Restrictions No Restrictions
तममल नजड Tamil Nadu 9 hrsday (6 hrs during day time and 3 hrs during night time) 9 hrsday (6 hrs during day time and 3 hrs during night time)
पडचिी Puducherry No Restrictions No Restrictions
परवी कषतर Eastern Region
बबहजि Bihar 18 hrsday 18 hrsday
झजिखणड Jharkhand 20 hrsday 20 hrsday
ओडडशज Odisha 24 hrsday 24 hrsday
पशशचम बगजल West Bengal 23 hrsday 23 hrsday
28
मारच 2019 कषि कषतर को षिदयत आपरतच का षििरण Power Supply to Agricultural Sector during March2019
राजय कषतर State Regionऔसत वरवदयत आपरत ण घनरो म Average Hours of Supply
On segregated feeders
SNo Contents Page
1 Growth of Installed Capacity since 6th Plan 29
2 Progress of Transmission Sector since 6th Plan 30
3 All India Yearly Coal consumption for Power Generation (Utilities)
4 All India Annual Per Capita Consumption of Electricity since -2006
5 Average cost of power supply amp Average realisation (Paisakwh)
6 Growth of Rural Electrification amp Pump Sets Energisation
7 Status of Hydro Schemes Cleared by the CEA in Apr-2019
Section G - Growth of Power Sector
31
32
(In MW)
Coal Gas Diesel Total
End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472
End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634
End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537
End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596
End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921
End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703
End of 12th Plan 19216288 2532938 83763 21832988 6780 4447842 50018 31960630
Up to Apr-2019 20070450 2493722 63763 22627934 678000 4539922 7764163 35610019
Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-17) = 51529 MW
Electricity Generation (MU) Targets and Achievements for 2016-17
Coal Gas Diesel Nuclear Hydro Res Total
2007045 2493722 637629 678000 453992 77641625 22925174
29
1 Growth of Installed Capacity Since 6th Plan
Plan YearThermal
Nuclear Hydro RES (MNRE) Total
2007045
2493722637629
678000
4539922
77641625
Total Installed Capacity 35610019 MW
Coal Gas Diesel Nuclear Hydro Res
Progress of Transmission Sector in the Country up to April 2019
1 TRANSMISSION LINES (All fig in CKM)
At the end of
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
6th plan 0 0 0 0 0 0 0 0 0 0 0 0 1831 4198 0 6029 1641 44364 0 46005 3472 48562 0 52034
7th plan 0 0 0 0 0 0 0 0 0 0 0 0 13068 6756 0 19824 4560 55071 0 59631 17628 61827 0 79455
8th plan 0 0 0 0 1634 0 0 1634 0 0 0 0 23001 13141 0 36142 6564 73036 0 79600 31199 86177 0 117376
9th plan 0 0 0 0 3234 1504 0 4738 751 409 0 1160 29345 20033 0 49378 8687 88306 0 96993 42017 110252 0 152269
10th plan 0 0 0 0 4368 1504 0 5872 1775 409 0 2184 48708 24730 0 73438 9444 105185 0 114629 64295 131828 0 196123
11th Plan 0 0 0 0 5948 1504 1980 9432 4839 411 0 5250 71023 30191 5605 106819 10140 125010 830 135980 91950 157116 8415 257481
12th Plan 6124 0 0 6124 5948 1504 1980 9432 25465 1177 4598 31240 92482 48240 17065 157787 11014 151276 978 163268 141033 202197 24621 367851
13th Plan (Up
to Mar2019)6124 0 0 6124 5948 1504 1980 9432 33692 1512 6605 41809 101335 58238 21173 180746 11734 162552 1010 175296 158833 223806 30768 413407
13th Plan (Up
to Apr-19)6124 0 0 6124 5948 1504 1980 9432 33745 1512 6605 41862 101335 58258 21173 180766 11734 162953 1010 175697 158886 224227 30768 413881
27150 600 MW of 132 kV Inter-Regional power transmission capacity links which are operated radially from time to time is not added in the total
75050
47900
24000
99050
30
Grand Total
Note - The figure upto the end of 10th plan in for stringing progress including the lines not commissioned Now only commissioned lines are reckoned Accordingly the figure for 10th plan (end) may read
as 187555 after adjusting with (-) 10852 Ckm
Inter-regional Power Transfer Capacity (MW)
plusmn 800 kV HVDC plusmn 500 kV HVDC 765 kV 400 kV 220 kV
IR addition in 12th
Plan (up to March
2017)
Inter-regional
Transmission
Capacity at the end
of Plan Period 2017-
22 (as on April19)
IR at the end of 11th
PlanIR at the end of 12th
Plan
IR Capacity Addition
at the end of Plan
Period 2017-22 (Till
April 19)
2004-05 27800
2005-06 28100
2006-07 30200
2007-08 33000
2008-09 35500
2009-10 36700
2010-11 38700
2011-12 41756
2012-13 45460
2013-14 48940
2014-15 53040
2015-16 54590
2016-17 57430
2017-18 60800
2018-19 62890
Year
2005-06
2006-07
2007-08
2008-09
2009-10
2010-11
2011-12
2012-13
2013-14
2014-15
2015-16
2016-17
2017-18
2018-19
2004-05 254 209 7568
2005-06 260 221 7636
2006-07 276 227 7423
2007-08 293 239 7727
2008-09 340 263 8713
2009-10 355 268 8870
2010-11 398 303 11975
2011-12 455 330 13514
2012-13 501 376 14867
2013-14 518 175
2014-15 520
Source- PFC Reports on the performance of State Power Utilities 31
1181
7335
7786
91441
8188
88363
957
1010
1075
1122
1149
(GrossGen+ Net Import) Mid-year population Provisional
5 Average cost of power supply amp average realization ( paiseKWH )
Yearcost of supply
(paiseunit)
Realization(paiseunit)
Including AgricultureOnly
Agriculture
6719
7171
3 All India yearly Coal Consumption for Power Generation (Utilities)
YEARCoal Consumption
Million Tonnes
4 All India Annual per Capita consumption of Electricity Since 2006
Per Capita Consumption ( kWh)
6314
Sl
NoExecuting Agency
Installed
Capacity (MW)Cost (Rs crore)
Date of
Clearance
32
Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as
Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received
from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made
available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified
villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is
independent of the earlier published reports
No Hydro Electric Project has been issued concurrenceAppraisal letter by CEA during April 2019
7 Status of Hydro Schemes Cleared by the CEA in Apr-2019
Name of Scheme
1999-002000-01
297594
010408 to 310309010409 to 310310
10th Plan
2005-062006-07
322968331020
6 Growth Of Rural Electrification amp Pumpsets Energisation
Plan Year
9th Plan2002-03
134092626
4111
Pump Sets Energised Villages Electricfied (Nos)
2001-02
284064367244
1218
27801997-981998-99
3207
482864
12632
1576036
4451722594
15455554
2314176
397343611750
2093311060316074
65109527813884
46708
18423975
499150
2003-042004-05
5743
9769
Cumu upto End of 10th Plan
010407 to 310308
010410 to 310311557976840909
010411 to 310312
412667
86293726
No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification
since 2004-05
65291374575 296361511th Plan
Cumu upto End of 11th Plan
596556 21212860
557439Cummulative up to end of 12th Plan
SN Contents Page
1 Rate of sale of power for the year 2016-17 33-41
RATE OF SALE OF POWER FOR THE YEAR 2016-17
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) NORTHERN REGION
CENTRAL SECTOR
BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 18000 66900 19800
CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 54000 222400 21600
CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 30000 144400 19600
CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 23100 91700 42600
PARBATI - III HPS NHPC LTD HYDRO-HYDRO 52000 68200 54800
DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 28000 95600 30000
CHUTAK NHPC LTD HYDRO-HYDRO 4400 22000 79800
DULHASTI HPS NHPC LTD HYDRO-HYDRO 39000 228000 56400
SALAL HPS NHPC LTD HYDRO-HYDRO 69000 342300 11000
TANAKPUR HPS NHPC LTD HYDRO-HYDRO 9420 43000 29600
URI HPS -I NHPC LTD HYDRO-HYDRO 48000 280300 16000
URI HPS - II NHPC LTD HYDRO-HYDRO 24000 147300 48600
NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 4500 24600 88200
SEWA - II NHPC LTD HYDRO-HYDRO 12000 47100 43400
ANTA CCPP NTPC LTD THERMAL-GASN 41930 67539 32400
AURAIYA CCPP NTPC LTD THERMAL-GASN 66336 53501 39100
BADARPUR TPS NTPC LTD THERMAL-COAL 70500 159153 44800
DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 84000 296170 42300
DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 98000 526686 46300
DADRI CCPP NTPC LTD THERMAL-GASHSD 82978 227469 33000
FARIDABAD CCPP NTPC LTD THERMAL-GASN 43159 115577 30800
RIHAND STPS I NTPC LTD THERMAL-COAL 100000 596766 24500
RIHAND STPS II NTPC LTD THERMAL-COAL 100000 737069 24600
RIHAND STPS III NTPC LTD THERMAL-COAL 100000 706546 30600
SINGRAULI STPS NTPC LTD THERMAL-COAL 200000 1394068 20400
TANDA TPS NTPC LTD THERMAL-COAL 44000 295438 40800
UNCHAHAR TPS I NTPC LTD THERMAL-COAL 42000 256454 39800
UNCHAHAR TPS II NTPC LTD THERMAL-COAL 42000 273577 38900
UNCHAHAR TPS III NTPC LTD THERMAL-COAL 21000 142780 43000
KOLDAM NTPC LTD HYDRO-HYDRO 80000 363260 43600
NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 303575 25841
RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 108000 668677 35374
NJHPS SJVNL HYDRO-HYDRO 150000 699496 23820
RAMPUR HPS SJVNL HYDRO-HYDRO 41202 195982 32260
TEHRI HPP THDC HYDRO-HYDRO 100000 272543 51800
KOTESHWAR HEP THDC HYDRO-HYDRO 40000 106244 53400
IGSTPS JHAJJAR ARAVALI P CPL THERMAL-COAL 150000 510429 49490
NEYVELI BARSINGSAR NEYVELI LIG CORP LTD THERMAL-LIG 25000 127520 38040
STATE SECTOR
PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 21000 14222 48200
PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 21000 19205 48400
PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 25000 102257 42600
PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 25000 62107 41800
DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 60000 312213 41000
RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 120000 35767442200
WYC HYDEL STATION HPGCL HYDRO-HYDRO 6240 20365 24900
GIRI POWER HOUSE HPSEB HYDRO-HYDRO 6000 13958 7600
ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 1695 5467 11900
BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 12000 18528 6700
GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 2250 7462 22500
BASSI POWER HOUSE HPSEB HYDRO-HYDRO 6600 29649 7500
BINWA POWER HOUSE HPSEB HYDRO-HYDRO 600 2749 19300
ANNEXURE-I
RATE OF SALE OF POWER FOR THE YEAR 2016-2017
Page 33
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) GAJ POWER HOUSE HPSEB HYDRO-HYDRO 1050 2914 26700
BANER POWER HOUSE HPSEB HYDRO-HYDRO 1200 2864 16200
HOLI POWER HOUSE HPSEB HYDRO-HYDRO 300 616 22500
THIROT POWER HOUSE HPSEB HYDRO-HYDRO 450 1126 22500
KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 1200 3064 22500
LARJI POWER HOUSE HPSEB HYDRO-HYDRO 12600 53677 23700
NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 250 750 31000
CHABA POWER HOUSE HPSEB HYDRO-HYDRO 175 465 23300
RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 150 101 13400
SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 200 000 22500
KILLAR HPSEB HYDRO-HYDRO 030 050 22500
BHABA AUGUMENP H HPSEB HYDRO-HYDRO 450 1276 22500
BS CHAMBA HPSEB HYDRO-HYDRO 045 099 19500
GUMMA HPSEB HYDRO-HYDRO 300 423 22500
GAS TURBINE POWER STATION IPGCL THERMAL-GAS 27000 67233 39300
PPS-I PPCL THERMAL-GAS 33000 175905 38300
PPS-III PPCL THERMAL-GAS 137120 196879 36100
LOWER JHELUM JampKPDD HYDRO-HYDRO 10500 60214 5100
UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 2260 10514 6300
UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 10500 44202 8500
GANDHARBAL JampKPDD HYDRO-HYDRO 1500 8925 4700
KARNAH MPH JampKPDD HYDRO-HYDRO 200 1122 31000
CHENANI I JampKPDD HYDRO-HYDRO 2330 10892 6600
CHENANI II JampKPDD HYDRO-HYDRO 200 1188 9300
CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 750 3634 14200
IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 375 2108 18500
IGO MERCHELLONG JampKPDD HYDRO-HYDRO 300 1572 29700
PAHALGAM MHP JampKPDD HYDRO-HYDRO 450 1713 32900
MARPACHOO JampKPDD HYDRO-HYDRO 075 375 29800
HAFTAL JampKPDD HYDRO-HYDRO 100 483 28700
SANJAK JampKPDD HYDRO-HYDRO 126 441 36000
SEWA-III JampKPDD HYDRO-HYDRO 900 3273 20200
BHADERWAH JampKPDD HYDRO-HYDRO 150 935 8900
BAZGO JampKPDD HYDRO-HYDRO 030 108 33300
SUMOOR JampKPDD HYDRO-HYDRO 010 045 35400
HUNDER JampKPDD HYDRO-HYDRO 040 176 26200
STAKNA JampKPDD HYDRO-HYDRO 400 1933 4100
KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 124000 662879 31360
SURATGARH TPS RRVUNL THERMAL-COAL 150000 402328 41730
CHHABRA TPS 1amp 2 RRVUNL THERMAL-COAL 50000 305946 36700
CHHABRA TPS 3 RRVUNL THERMAL-COAL 25000 151536 36700
CHHABRA TPS 4 RRVUNL THERMAL-COAL 25000 155896 36700
RAMGARH GT POWER PROJECT RRVUNL THERMAL-COAL 22050 43177 41800
RAMGARH GAS T P PROJECT 3 RRVUNL THERMAL-GAS 5000 93615 41800
DHOLPUR C C POWER PROJECT RRVUNL THERMAL-R-LNG 33000 9486 46110
MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 14000 20855 34192
MINI MICRO HYDEL (MMH) P S RRVUNL HYDRO-HYDRO 2385 851 37800
KALISINDH TPP 1 RRVUNL THERMAL-COAL 60000 341543 45000
KALISINDH TPP 2 RRVUNL THERMAL-COAL 60000 211588 45000
KHARA HEP UPJVNL HYDRO-HYDRO 7200 26654 7200
MATATILLA HEP UPJVNL HYDRO-HYDRO 3060 12219 6500
OBRA HEP UPJVNL HYDRO-HYDRO 9900 21517 6300
RIHAND UPJVNL HYDRO-HYDRO 30000 57369 5500
ANPARA A TPS UPRVUNL THERMAL-COAL 63000 317536 27000
ANPARA B TPS UPRVUNL THERMAL-COAL 100000 705605 22700
ANPARA D UPRVUNL THERMAL-COAL 100000 300158 39800
HARDUAGANJ TPS UPRVUNL THERMAL-COAL 16500 45817 49200
HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 50000 304389 46600
OBRA A TPS UPRVUNL THERMAL-COAL 28800 13158 34000
OBRA B TPS UPRVUNL THERMAL-COAL 100000 328124 21900
Page 34
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) PANKI TPS UPRVUNL THERMAL-COAL 21000 66488 50300
PARICHHA TPS UPRVUNL THERMAL-COAL 22000 38762 49400
PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 42000 231931 45600
PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 50000 276722 50400
CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 24000 70845 8290
CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 14400 75366 8390
DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 3375 9595 12080
DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 5100 18701 10520
KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4140 17359 12330
KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 12000 33001 9420
KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 3000 11953 8320
TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 9000 33983 12460
MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 30400 124510 16110
RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 19800 17897 10550
MPUR UTTARAKHAND JVNL HYDRO-HYDRO 930 5121 19200
PATHRI UTTARAKHAND JVNL HYDRO-HYDRO 2040 11636 14200
GALOGI UTTARAKHAND JVNL HYDRO-HYDRO 300 648 12500
PRIVATE SECTOR
MGTPP CLP INDIA PVT LTD THERMAL-COAL 132000 268902 41940
SHRINAGAR HEP ALAKNANDA HPCL HYDRO-HYDRO 33000 127414 48800
GAMA INFRAPROP CCPP GAMA INFRAPROP PVT THERMAL-GAS 22500 52686 47000
PPGCL (BARA) JP POWER VENTURES LTD THERMAL-COAL 198000 448200 38500
MALANA HEP MALANA PCL HYDRO-HYDRO 8600 26354 29792
MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 10000 30369 32580
ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 19200 56347 36079
KASHANG HEP H P PCL HYDRO-HYDRO 19500 5034 29200
BASPA-II HEP HBPCL HYDRO-HYDRO 30000 132769 13600
KARCHAM WANGTOO HEP HBPCL HYDRO-HYDRO 100000 434386 36600
RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 108000 582600 43700
RITHALA COMBI CY POWER PLANT TATA POWER DDL THERMAL-GAS 9480 000 11900
RAJPURA TPS NABHA POWER LTD THERMAL-GAS 140000 901484 39000
TALWANDI SABO POWER LTD TALWANDI SABO POWER LTD THERMAL-COAL 198000 636040 49548
ROJA THERMAL POWER STATION ROJA POWER SCL THERMAL-COAL 120000 727200 43400
KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 34400 63400
BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 36000 62600
MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 38200 60800
UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 37900 61500
KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 42300 58800
LALITPUR PGCL BAJAJ ENERGY PVT LTD THERMAL-COAL 198000 359400 47300
PRAYAGRAJ PGCL PRAYAGRAJ PGCL THERMAL-COAL 132000 448200 38595
KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 132000 783182 33438
WESTERN REGION
CENTRAL SECTOR
INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 100000 325333 23892
OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 52000 141663 34001
GANDHAR CCPP NTPC LTD THERMAL-GAS 65739 221924 28700
KAWAS CCPP NTPC LTD THERMAL-GASN 65620 167929 27000
KORBA I amp II NTPC LTD THERMAL-COAL 210000 1499171 20500
KORBA III NTPC LTD THERMAL-COAL 50000 358746 26600
SIPAT STPS I NTPC LTD THERMAL-COAL 198000 1479902 26800
SIPAT STPS II NTPC LTD THERMAL-COAL 100000 766549 26500
VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 126000 693142 25800
VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 100000 608781 23800
VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 100000 673475 27600
VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 100000 655924 32900
VINDHYACHAL STPS V NTPC LTD THERMAL-COAL 50000 328265 31700
MOUDA I NTPC LTD THERMAL-COAL 100000 343130 44500
MOUDA Ii NTPC LTD THERMAL-COAL 66000 40637 39900
RATNAGIRI GAS amp POWER PVT LTD RGPPL THERMAL-GAS 196708 442485 47000
KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 000 24729
TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 32000 201227 10740
Page 35
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 365122 19069
TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 787444 29324
STATE SECTOR
GSEG-HAZIRA15610 MW GUJARAT S ENEGEN LTD THERMAL-GAS 15610 1805 28200
GSEG-HAZIRA35143 MW GUJARAT S ENEGEN LTD THERMAL-GAS 35130 22276 51300
GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 21978 51800
AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 13929 26100
KORBA TPS EAST CSPGCL THERMAL-COAL 44000 198673 33880
DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 365808 27570
KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 316500 30420
HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 532878 19410
CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 515 58300
MTTPS CHAMPA U-I CSPGCL THERMAL-COAL 50000 220376 39000
MTTPS CHAMPA U-II CSPGCL THERMAL-COAL 50000 23709 10000
SHP GANGREL CSPGCL HYDRO-HYDRO 1000 2350 36790
BANGO HEP CSPGCL HYDRO-HYDRO 12000 14662 8900
MHP KORBA WEST CSPGCL HYDRO-HYDRO 170 859 38190
SIKASAR HEP CSPGCL HYDRO-HYDRO 700 418 26870
DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8843 74500
DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 19446 51500
GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 66388 71600
GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127488 41300
KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 96072 43900
KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 29841 56400
SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 184966 58800
UKAI 1-5 GSECL THERMAL-COAL 85000 204891 46900
UKAI TPS 6 GSECL THERMAL-COAL 50000 284448 48200
WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 271999 58300
WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 82808 44100
KADANA HPS GSECL HYDRO-HYDRO 24200 34433 16800
UKAI HPS GSECL HYDRO-HYDRO 30500 40585 6100
TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 123000 11500
BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 8900 10900
BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 7200 27500
JHINNA HPS MPPGCL HYDRO-HYDRO 2000 9700 18500
RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 44300 3400
GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 17300 4600
SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 4100 16900
MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 14600 27000
PENCH HPS MPPGCL HYDRO-HYDRO 16000 23700 8100
RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 3000 16900
AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 134400 35100
SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 283800 38700
SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 344600 34300
SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 111600 61600
SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 211800 58000
SSTPS PH-I MPPGCL THERMAL-COAL 120000 233100 84300
BHUSAWAL TPS MSPGCL THERMAL-COAL 142000 566258 51100
CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1365682 33700
KHAPERKHEDA MSPGCL THERMAL-COAL 134000 706207 39100
KORADI TPS MSPGCL THERMAL-COAL 62000 443206 42000
NASIK TPS MSPGCL THERMAL-COAL 63000 297275 47000
PARLI TPS MSPGCL THERMAL-COAL 113000 175934 71600
PARAS MSPGCL THERMAL-COAL 50000 267931 38700
URAN CCPP MSPGCL THERMAL-GAS 67200 320330 30600
KOYANA MSPGCL HYDRO-HYDRO 195600 328155 13100
SMALL HYDRO POWER PLANTS MSPGCL HYDRO-HYDRO 45400 93062 30500
BHIRA MSPGCL HYDRO-HYDRO 8000 10046 8400
TILLARI MSPGCL HYDRO-HYDRO 8900 10584 3100
SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 233298 20500
SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 87633 20500
PRIVATE SECTOR
Page 36
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 81282 46750
JNSTPP(JAYPEE NIGRIE) JP POWER VENTURES LTD THERMAL-COAL 132000 726695 29310
MB POWER MB POWER THERMAL-COAL 120000 345632 38310
ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 754922 28671
ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 780761 23495
ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 198000 1263784 32090
ADANI POWER MAHARA ADANI POWER LTD THERMAL-COAL 330000 1666191 34124
AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 170065 36827
SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 252035 45129
ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 458551 36000
ESSAR POWER MP LTD ESSAR POWER MP LTD THERMAL-COAL 60000 243040 28600
VEDANTA LTD (P P -I) VEDANTA LTD THERMAL-GAS 3000 15044 24000
VEDANTA LTD (P P -II) VEDANTA LTD THERMAL-GAS 3000 21293 24000
PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 8234600 24000
165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 5850 64390
145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 68717 40349
SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 132655 28776
SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 144686 38567
MUNDRA UMPPCOASTAL GUJARAT POWER
LTD THERMAL-IMP COAL 400000 2530300
23900
LANCO AMARKANTAK TPP PATHADIH
U-ILANCO AMARKAN POWER LTD THERMAL-COAL 30000 195500
29200
LANCO AMARKANTAK TPP PATHADIH
U-IILANCO AMARKAN POWER LTD THERMAL-COAL 30000 206900
27600
BARADARHA TPS D B POWER LTD THERMAL-COAL 120000 677373 29200
JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 405000 28900
JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 453000 40500
DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 339437 40700
TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 293400 44000
TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 137200 37000
TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 174900 44000
BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 92900 14100
BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23700 34300
KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 27600 48300
CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2530300 23900
BHANDARDRA HEP -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 2475 54900
SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 161400 26500
SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 445000 39000
SOTHERN REGION
CENTRAL SECTOR
NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 325699 54820
NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 305532 39880
NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 998805 38510
NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 113016 54070
NEYVELI TAMILNADU POWER LTD JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 625274 42200
VALLUR TPS NTPC TECL THERMAL-COAL 150000 856438 42350
R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 1493 84300
RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1502919 29400
RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 341291 31800
SIMHADRI I NTPC LTD THERMAL-COAL 100000 688382 36800
SIMHADRI II NTPC LTD THERMAL-COAL 100000 663657 43400
KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 593110 31324
MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 291625 21764
KKNPP-1 amp 2 NPCIL NUCLEAR-NUCLEAR 200000 572609 40948
MINICOY LAKSHADEEP THERMAL-DIESEL 340 770 29600
KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1097 29600
AMINI LAKSHADEEP THERMAL-DIESEL 265 509 29600
ANDROTT LAKSHADEEP THERMAL-DIESEL 219 524 29600
KALPENI LAKSHADEEP THERMAL-DIESEL 175 356 29600
AGATTI LAKSHADEEP THERMAL-DIESEL 195 658 29600
KADMAT LAKSHADEEP THERMAL-DIESEL 190 414 29600
KILTAN LAKSHADEEP THERMAL-DIESEL 150 269 29600
CHETLET LAKSHADEEP THERMAL-DIESEL 100 139 29600
BITRA LAKSHADEEP THERMAL-DIESEL 043 024 29600
BANGARAM LAKSHADEEP THERMAL-DIESEL 018 009 29600
Page 37
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) STATE SECTOR
Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 721811 46500
Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 50000 336142 46500
RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 237358 46500
RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 239926 46500
RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 124500 46500
SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 62109 46500
UPPER SILERU APGENCO HYDRO-HYDRO 24000 33000 46500
LOWER SILERU APGENCO HYDRO-HYDRO 46000 81066 46500
DONKARAI APGENCO HYDRO-HYDRO 2500 6007 46500
PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 1262 46500
CHETTIPETA APGENCO HYDRO-HYDRO 100 214 46500
MUCHKUND APGENCO HYDRO-HYDRO 12000 37571 46500
NAGARJUNASAGAR RCPH APGENCO HYDRO-HYDRO 9000 606 46500
TUNGABHADRA HES amp HAMPI(AP
Share)
APGENCO HYDRO-HYDRO 7200 6100 46500
KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 352232 42600
KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 288131 32500
KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 319272 46500
RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 40073 44300
KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 308317 46000
KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 308963 51300
SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 61004 76600
NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 17960 75300
PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 20873 58300
POCHAMPAD-I TSPGENCO HYDRO-HYDRO 2700 5455 29800
POCHAMPAD-II TSPGENCO HYDRO-HYDRO 900 1932 40700
NIZAMSAGAR TSPGENCO HYDRO-HYDRO 1000 1126 53400
RAICHUR TPS 1 to 7 KPCL THERMAL-COAL 147000 890866 43800
RAICHUR TPS 8 KPCL THERMAL-COAL 25000 159523 48200
BELLARI TPS 1 KPCL THERMAL-COAL 50000 318679 51100
BELLARI TPS 2 KPCL THERMAL-COAL 50000 232347 55600
BELLARI TPS 3 KPCL THERMAL-COAL 70000 47565 34400
BHADRA PH KPCL HYDRO-HYDRO 3920 2369 45900
GERUSUPPA PH KPCL HYDRO-HYDRO 24000 26990 22000
GHAT PRABHA HEP KPCL HYDRO-HYDRO 3200 4777 25300
KADRA HPS KPCL HYDRO-HYDRO 15000 16889 26800
NAGJHARI KPCL HYDRO-HYDRO 90000 155159 9800
KODASALLI DPH KPCL HYDRO-HYDRO 12000 14854 19200
MUNIRA+MGH+SPH+SPH KPCL HYDRO-HYDRO 22640 48211 7900
SHARAVATHY HPS KPCL HYDRO-HYDRO 108550 276215 5400
ALMATTI DPH KPCL HYDRO-HYDRO 29000 39611 24600
VARAHI UGPH KPCL HYDRO-HYDRO 46000 71368 15600
IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 17196 15300
IDUKKI HPS KSEB HYDRO-HYDRO 78000 137905 15300
KAKKAD HPS KSEB HYDRO-HYDRO 5000 13063 15300
KALLADA HPS KSEB HYDRO-HYDRO 1500 4436 15300
KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 46544 15300
KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 635 15300
LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 30822 15300
MALANKARA HPS KSEB HYDRO-HYDRO 1050 2474 15300
MATTUPETTY KSEB HYDRO-HYDRO 200 230 15300
MALAMPUZHA KSEB HYDRO-HYDRO 250 063 15300
CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 864 15300
URUMI ST I amp II KSEB HYDRO-HYDRO 615 903 15300
LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 248 15300
NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7765 19625 15300
PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 16601 15300
PANNIAR HPS KSEB HYDRO-HYDRO 3240 6217 15300
PORINGALKUTHU KSEB HYDRO-HYDRO 3600 10052 15300
PORINGALKUTHU LBE KSEB HYDRO-HYDRO 1600 9438 15300
PEPPARA KSEB HYDRO-HYDRO 300 395 15300
POOZHITHODE KSEB HYDRO-HYDRO 480 1045 15300
Page 38
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) PEECHI KSEB HYDRO-HYDRO 125 040 15300
RANI-PERUNADU KSEB HYDRO-HYDRO 400 585 15300
SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 79783 15300
SENGULAM HPS KSEB HYDRO-HYDRO 5120 11558 15300
SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 16711 15300
VILANGAD KSEB HYDRO-HYDRO 750 1578 15300
BARAPOLE KSEB HYDRO-HYDRO 1500 1932 15300
VELLATHOOVAL KSEB HYDRO-HYDRO 360 305 15300
CHIM0NY KSEB HYDRO-HYDRO 250 156 15300
ADYANPARA KSEB HYDRO-HYDRO 350 501 15300
BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 554 15300
KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 3801 15300
KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 23132 32800
ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 14416 62280
METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 523970 62280
METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 321270 62280
NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 336575 62280
NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 591240 62280
TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 508966 62280
KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 30897 62280
VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 18720 90699 62280
KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 33593 62280
BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 1047 62280
PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 1250 62280
PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 330 62280
MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 4897 62280
MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 032 62280
KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15681 62280
KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 40608 62280
KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 21342 62280
KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 4717 62280
KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4322 62280
KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2399 62280
METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 4416 62280
METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 8035 62280
BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2187 62280
BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2359 62280
BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2511 62280
BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 1949 62280
BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 1819 62280
POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 172 62280
SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 241 62280
MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 026 62280
THIRUMOORTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 136 62280
PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 9309 62280
VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 353 62280
SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 4192 62280
PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 6571 62280
SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 1186 62280
SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6319 62280
ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 6122 62280
KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 28674 62280
SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 18381 62280
SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 4258 62280
KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 12680 62280
KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4201 62280
ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 000 62280
PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 19175 62280
AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 078 62280
BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 504 62280
BHAVANI KATTALAI (BKB)(IIIampIII BB I amp II)TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 5847 62280
PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 000 62280
Page 39
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) SRI DAMODARAM STPS APPDCL THERMAL-COAL 160000 808108 36300
PRIVATE SECTOR
KARUPPUR TANJORE LANCO TANJORE PCL THERMAL-GAS 12000 48096 28770
SIMHAPURI ENERGY LTD SIMHAPURI ENERGY LTD THERMAL-COAL 60000 143900 39100
JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 7111 45500
SBU 1 JSW ENERGY LTD
VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 26000 159100
43300
SBU 2 JSW ENERGY LTD
VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 60000 247900
42800
LANCO KPLLANCO KONDAPALLI POWER
LTDTHERMAL-GAS 36814 85060
25776
LANCO KPL STG -IILANCO KONDAPALLI POWER
LTDTHERMAL-GAS 36600 12979
46330
LANCO KPL STG -IIIALANCO KONDAPALLI POWER
LTDTHERMAL-GAS 37100 85710
46330
LANCO KPL STG -III BLANCO KONDAPALLI POWER
LTDTHERMAL-GAS 37100 43639
46330
HINDUJA NATIONAL PCL HINDUJA NATIONAL PCL THERMAL-COAL 104000 303000 38200
MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 121164 49940
UDUPI POWER COR LTD ADANI POWER LTD THERMAL-COAL 120000 754613 42500
SPECTRUM POWER GENERATION
LTD SPECTRUM PG LTD THERMAL-GASN 20525 9256812
34952
TAQA NEYVELI POWER COM PVT
LTD TAQA NEYVELI THERMAL-LIG 25000 5840
34500
ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 251000 51000
ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 207860 36800
GMR VEMAGIRI POWER GENERATION
LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 30117
46450
EASTERN REGION
CENTRAL SECTOR
MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 64675 53113
MTPS STAGE - II KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 39000 1432 69138
BOKARO `B` TPS DVC THERMAL-COAL 63000 145670 31539
MEJIA TPS U 1-3 DVC THERMAL-COAL 63000 348298 31552
MEJIA TPS U 4 DVC THERMAL-COAL 21000 116099 34997
MEJIA TPS U 5-6 DVC THERMAL-COAL 50000 276427 35976
MEJIA TPS U 7-8 DVC THERMAL-COAL 100000 552854 36991
DURGAPUR STEEL TPS DVC THERMAL-COAL 100000 665550 39323
DURGAPUR TPS DVC THERMAL-COAL 21000 59270 35416
RAGHUNATHPUR TPS DVC THERMAL-COAL 120000 201650 35326
MAITHON HYDEL STA DVC HYDRO-HYDRO 6320 12200 17984
CHANDRAPURA TPSU1-3 DVC THERMAL-COAL 42000 257610 35095
CHANDRAPURA TPSU7-8 DVC THERMAL-COAL 50000 306673 34987
KODERMA TPS DVC THERMAL-COAL 100000 380180 38131
PANCHET HPS DVC HYDRO-HYDRO 8000 13360 17984
TILLAYA HPS DVC HYDRO-HYDRO 400 1410 17984
RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34700 35400
TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 277300 23200
TLDP -III NHPC LTD HYDRO-HYDRO 13200 55400 62000
TLDP -IV NHPC LTD HYDRO-HYDRO 16000 60300 25600
FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 957219 33700
FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 308943 41000
BONGAINGAON TPS NTPC LTD THERMAL-COAL 25000 153663 58600
KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 542277 34200
KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 942591 34200
BARH-II NTPC LTD THERMAL-COAL 132000 728021 44500
TALCHER TPS NTPC LTD THERMAL-COAL 46000 335521 30100
TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 702319 25600
TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1436521 24700
STATE SECTOR
BTPS(RampM) BIHAR STATE PGCL THERMAL-COAL 22000 12142 39700
BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 98331 10602
HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 50593 9482
CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 19689 2605
RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 53192 6033
UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 147208 14637
Page 40
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 60353 4519
IB TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 288567 25000
J P H GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 210 038 61100
MEYONG CHU GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 400 1086 61100
TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 122667 38200
DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 214339 43321
KOLAGHAT THERMAL POWER
STATION
WEST BENGAL PDCL THERMAL-COAL 126000 538269 31603
BAKRESHWAR THERMAL POWER
PLANT
WEST BENGAL PDCL THERMAL-COAL 105000 634876 32154
BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 45000 166855 33299
SANTHALDIH THERMAL POWER
STATION
WEST BENGAL PDCL THERMAL-COAL 50000 336442 34932
SAGARDIGHI THERMAL POWER
PROJECT
WEST BENGAL PDCL THERMAL-COAL 160000 423121 34705
JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 20344 68900
RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 24559 68900
TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 4623 68900
PURULIA PUMPED STORAGE
PROJECT
WEST BENGAL SEDCL HYDRO-HYDRO 90000 108816 68900
MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2768 68900
PRIVATE SECTOR
CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 49474 20230
CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 555500 70200
HALDIA ENERGY HALDIA ENERGY LTD THERMAL-COAL 60000 371000 50400
DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3688 63400
KAMALANGA TPS GMR KAMALANGA ENERGY LTD THERMAL-COAL 105000547670
33300
ADHUNIK POWER U-1 ADHUNIK POWER THERMAL-COAL 27000 158 44060
ADHUNIK POWER U-2 ADHUNIK POWER THERMAL-COAL 27000 168 44250
VL-JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 332800 23622
JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 43000 45250
JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 71700 37030
JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 70700 35920
JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 71100 38870
JOJOBERA UNIT 5 TATA POWER COM LTD THERMAL-COAL 12000 79300 44560
JOJOBERA UNIT 6 TATA POWER COM LTD THERMAL-WHR 12000 83700 12840
IEL KALINGANAGAR U-I TATA POWER COM LTD THERMAL-WG 6750 33400 22500
IEL KALINGANAGAR U-II TATA POWER COM LTD THERMAL-WG 6750 34800 22500
MAITHON UNIT 1 amp 2 TATA POWER COM LTD THERMAL-COAL 105000 678000 36100
HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 27500 24340
HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 28400 24340
HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 15800 24310
NORTH EASTERN REGION
CENTRAL SECTOR
LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 74100 36600
AGARTALA GT NEEPCO THERMAL-GAS 13500 88611 27210
ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 153111 32310
DOYANG HEP NEEPCO HYDRO-HYDRO 7500 25598 49801
KOPILI HEP NEEPCO HYDRO-HYDRO 20000 98186 11491
KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 19582 20237
KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 10310 17968
RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 124093 22945
TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 10100 17344 39000
STATE SECTOR
HYDRO POWER (122 Stns) ITANAGAR GOVT OF ARUNACHAL
PRADESHHYDRO-HYDRO 6971 6217270
24600
KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39514 17337
LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 82327 36810
NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 33318 48290
MYNTRIANG SHEP ST II ASSAM POWER GENCO HYDRO-HYDRO 300 567 35776
LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 9130 49200
LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 012 49200
DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 022 49200
TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 000 49200
UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 4990 16000
UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 6476 37000
UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 16494 14600
UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 3600 9556 15000
SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 758 8000
MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44070 44800
KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 154 41400
TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 091 41400
MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 411 41400
MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 394 41400
KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 760 41400
SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 3264 41400
LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 044 41400
BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 18953 28000
ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 43585 28200
GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 4080 11100
Note
LIG Lignite N Naptha WHR Waste Heat Recovery
Page 41
Achievement Targets Achievement
Apr-18
Thermal 69755 1160 0 000
Hydro 0 0 0 NA
Nuclear 0 0 0 NA
All India 69755 1160 0 000
Apr-18 to Apr-18 Apr-19 to Apr-19 Change wrt Previous Year
Thermal 69755 0 00
Hydro 0000 0 NA
Nuclear 0000 0 NA
All India 69755 0 00
2
2 Generating Capacity Addition for Apr-2019 (MW)
Generating Capacity Addition during Apr-18 to Apr-18 amp Apr-19 to Apr-19
NA- Not Applicable
Achivement
wrt Apr-2018Type
Apr-19
698
000
10
20
30
40
50
60
70
80
1Apr-18 Apr-19
0000
10000
20000
30000
40000
50000
60000
70000
80000
Apr-18 to Apr-18 Apr-19 to Apr-19
1
2
3
Nuclear Hydro RES Grand TotalRegion Coal Lignite Gas Diesel Total
Northern 5036020 158000 578126 000 5772146 162000 1970777 1419902 9324825
Western 7280862 154000 1080649 000 8515511 184000 754750 2307894 11762155
Southern 4304202 314000 647366 56158 5321726 332000 1177483 3862018 10693227
Eastern 2746364 000 10000 000 2756364 000 494212 140148 3390724
North-East 77002 000 177581 3600 258183 000 142700 32429 433311
Islands 000 000 000 4005 4005 000 000 1773 5778
ALL INDIA 19444450 626000 2493722 63763 22627934 678000 4539922 7764163 35610019
Note Captive Genaration is not included in the total Captive Power capacity as on 31032017 RES as on 31032019 3
Thermal
Nuclear
3 List of Projects Commissioned During Apr-2019
4 All India Installed Capacity (MW) Region-wise as on 30-04-19
NIL
NIL
Thermal
NIL
Hydro
22627934
678000
4539922
7764163
35610019
51529
000
5000000
10000000
15000000
20000000
25000000
30000000
35000000
40000000
Thermal Nuclear Hydro RES Total Captive
Thermal Nuclear Hydro RES Total Captive
Total = 356100189
Sector
Coal Lignite Gas Diesel Total
State 6407650 129000 711871 36393 7284913 000 2987880 234793 10507586
Private 7468800 183000 1058060 27370 8737230 000 339400 7366140 16442770
Central 5568000 314000 723791 000 6605791 678000 1212642 163230 8659663
All India 19444450 626000 2493722 63763 22627934 678000 4539922 7764163 35610019
State 10507586
Private 16442770
Central 8659663
Electricity Generation (MU) Targets and Achievements for 2016-17
5 All India Installed Capacity (MW) Sector-wise as on 30-04-19
4
Grand TotalTHERMAL
Nuclear Hydro RES
RES as on 31032019
State 10507586 30
Private 16442770 46
Central 8659663 24
All India Installed Capacity(MW) (Sector-Wise)
Voltage Level
+- 500 KV HVDC
+- 800 KV HVDC
765 KV
400 KV
220 KV
All India
Voltage Level
+- 500 KV HVDC
+- 800 KV HVDC
765 KV
400 kV
220 KV
All India
5
481 401
763 474
0 0
242 53
40 20
0 0
242 53
40 20
481 401
763 474
Transmission Lines Added duringApr-18 to Apr-18 ampApr-19 to Apr-19 (Ckms)
Apr-18 to Apr-18 Apr-19 to Apr-19
0 0
6 Transmission Lines Added during Apr-2019 (Ckms)
Apr-18 Apr-19
0 0
763
474
0
100
200
300
400
500
600
700
800
900
All India
Ckm
s
Apr-18 Apr-19
763
474
0
100
200
300
400
500
600
700
800
900
All India
Ckm
s
Apr-18 to Apr-18 Apr-19 to Apr-19
Voltage Level
+- 800 KV HVDC
+- 500 KV HVDC
765 KV
400 KV
220 KV
All India
Voltage Level
+- 800 KV HVDC
+- 500 KV HVDC
765 KV
400 KV
220 KV
All India
6
0 0
All India Transformation Capacity Addition during Apr-18 to Apr-18 amp Apr-19
to Apr-19 (MVA)
4600
0
500
2795
1305
5470
4000
185
1285
0
Apr-18 to Apr-18 Apr-19 to Apr-19
5470
0
500
4600
2795
1305
7 Transformation Capacity Addition During Apr-2019 (MVA)
0
4000
185
1285
0 0
Apr-18 Apr-19
5470
4600
4000
4200
4400
4600
4800
5000
5200
5400
5600
MV
A
Apr-18 Apr-19
5470 4600
0
74520
1
MV
A
Apr-18 to Apr-18 Apr-19 to Apr-19
Apr-2018 Apr-2019 Apr-2018 Apr-2019 Apr-2018 Apr-2019
Northern 28590 30094 28170 29786 -15 -10
Western 33235 34875 33233 34868 00 00
Southern 29211 31111 29166 31109 -02 00
Eastern 11752 12851 11650 12850 -09 00
North Eastern 1225 1300 1174 1228 -42 -55
All India 104013 110231 103393 109842 -06 -04
Apr-2018 Apr-2019 Apr-2018 Apr-2019 Apr-2018 Apr-2019
Northern 48824 54476 48367 53985 -09 -09
Western 50654 56242 50434 56222 -04 00
Southern 45946 49155 45684 49103 -06 -01
Eastern 21320 23349 21275 23349 -02 00
North Eastern 2600 2848 2552 2780 -18 -24
All India 162492 177411 161286 176810 -07 -03
Apr-2019 Figures are Provisional
7
8 Power Supply Position (Energy amp Peak) in Apr-2019
Peak Demand Peak Met
Requirement Availability
Energy (MU)Region
Surplus(+)
Deficit (-) in
Surplus(+)
Deficit (-) in Region
Power (MW)
Chandigarh Delhi Haryana HP JampK Punjab Rajasthan UP Utrakhand Apr-2018 0 0 0 0 546 0 0 247 0
Apr-2019 0 0 0 0 565 0 0 0 0
Chattisgarh Gujarat MP Maharashtra Daman amp Diu Dadar Nagar Goa
Apr-2018 13 11 3 99 0 0 0
Apr-2019 22 6 0 8 1 0 0
AP Telangana Karnataka Kerala Tamil Nadu Puducherry Lakshadweep
Apr-2018 22 0 2 0 0 20 0
Apr-2019 0 0 0 8 0 2 0
8
9 Peak Shortage of Power Supply (MW) in Different Regions in Apr-2019
0 0 0 0
565
0 0 0 00 0 0 0
546
0 0
247
0
0
400
800
Ch
an
dig
ar
h Delh
i
Ha
rya
na
HP
Jamp
K
Pu
nja
b
Ra
jasth
an
UP
Utr
akhan
d
MW
Northern States (MW) Apr-2019 Apr-2018
22
6 0 8 1 0 0
13
11
3
99
0 0 0
0
50
100
150
Ch
attis
gar
h
Guja
rat
MP
Mah
ara
shtr
a
Da
man amp
Diu
Da
dar
Na
gar G
oa
MW
Western States (MW) Apr-2019 Apr-2018
0 0 08
0 2 0
22
0 2 0 0
20
00
50
AP Telangana Karnataka Kerala Tamil Nadu Puducherry Lakshadweep
Southern State (MW) Apr-2019 Apr-2018
Bihar DVC Jharkhand Odisha West Bengal Sikkim AampN Island
Apr-2018 0 39 0 0 7 0 4
Apr-2019 0 0 0 0 0 0 4
Arunachal Assam Manipur Meghalaya Mizoram Nagaland Tripura
Apr-2018 5 30 7 0 9 29 4
Apr-2019 3 45 9 0 3 26 1
9
0 0 0 0 0 0
4
0
39
0 0
7
0
4
01020304050
Bih
ar
DV
C
Jha
rkh
an
d
Od
ish
a
We
st
Be
ng
al
Sik
kim
Aamp
NIs
land
MW
Eastern States (MW) Apr-2019 Apr-2018
3
45
9
0 3
26
1
5 7
0
9
29
4
0
10
20
30
40
50
Aru
na
cha
l
Assa
m
Ma
nip
ur
Me
gh
ala
ya
Miz
ora
m
Na
gala
nd
Trip
ura
MW
North-Eastern States (MW)
Sector Apr-2018 Apr-2019
Central 7634 7459
State 6438 6142
Private Sector IPP 5525 6005
Private Sector UTL 6815 6440
ALL INDIA 6454 6471
Month PLF 2018 PLF 2019
Jan 6215 6054
Feb 6230 6051
March 6452 6340
April 6454 6471
For Coal and Lignite based Power Plants and Provisional based on Actual-Cum-Assesment
10
PLF of Thermal Power Plants
(excluding gas based power plants)
All India PLF of Thermal Plants (Excluding Gas Based Plants) Month-wise
10 All India Thermal PLF Sector-wise (Excluding Gas Based Power Plants) for Apr-2019
5800
6000
6200
6400
6600
Jan Feb March April
Months
All India PLF Month-wise
PLF 2018 PLF 2019
7634
64385525
6815 6454
7459
6142 60056440 6471
000
2000
4000
6000
8000
10000
Central State Private Sector IPP Private Sector UTL ALL INDIA
All India Thermal PLF
Apr-2018 Apr-2019
2012-13 2013-14 2014-15 2015-16 2016-17 2017-18
TampD Losses 2304 2284 2277 2181 2142 2104
ATampC Losses 2548 2262 2572 2398 NA NA
Provisional
Note As per PFC for utilities selling directly to consumers NA- Not Available
Total Number of Villages
597464
Note From the year 2004-05 onwards Definition of Village Electrification-
A village would be declared Electrified if
Without
Subsidy
Gap ACS-
ARR(
Without
Subsidy)
Paiseunit
Gap ACS-
ARR (on
subsidy
booked
basis)
paiseunit
Gap ACS-
ARR (on
subsidyrece
ived basis)
paiseunit
2013-14 400 118 76 77
2014-15 412 108 58 60
Source- PFC Reports on the performance of State Power Utilities
2013-14 4894
2014-15 5304
2015-16 5459
2016-17 5743
2017-18 6080
2018-19 6289
11
11 T amp D and ATampC Losses ()
12 All India Village Electrification
Villiages Electrified (Nos)
10000All villages as per census 2011 has
been electrified on 28042018
Villages electrified
Average cost of supply(ACS)
(paiseunit)
i) Basic Infrastructure such as Distribution Transformer and Distribution lines are provided in the inhabited locality
as well as Dalit Basti hemlet where it exists (For electrification through Non-Conventional Energy Sources a
Distribution Transformer may not be necessary)
14 All India Coal consumption for Power Generation (MT)
520
Average Revenue Realization(paiseunit)
518
Year
ii) Electricity is provided to Public places like Schools Panchayat Office Health Centre Dispensaries Community
Centres etc and
iv) Mandatory Certification from Gram Panchayat regarding the completion of village electrification should be
obtained
13 Average cost of Power amp Average Realisation
iii) The number of households electrified should be at least 10 of the total number of households in the village
SN Contents Page
1 Capacity Addition Targets and Achievements in 12th Plan amp upto March2019 12
2 Capacity Addition Targets amp Achievements during Apr-2019 and Apr-19 to Apr-19 13
3 Installed Capacity in various Regions including their shares 14-19
Section B - Capacity Addition
(i) CAPACITY ADDTION TARGETS AND ACHIEVEMENTS IN THE 12TH PLAN Figures in MW
TARGET ACH TARGET ACH TARGET ACH TARGET ACH
CENTRAL 14878 15869 6004 2584 5300 2000 26182 20453
STATE 13922 22201 1608 2276 0 0 15530 24477
PRIVATE 43540 53661 3285 619 0 0 46825 54280
ALL INDIA 72340 91730 10897 5479 5300 2000 88537 99209
(ii) CAPACITY ADDITION TARGET AND ACHIEVEMENT FOR 2017-18 (IN MW)
THERMAL HYDRO NUCLEAR
TARGET ACH TARGET ACH TARGET ACH TARGET ACH
CENTRAL 4880 3170 800 390 500 6180 3560
STATE 3546 1760 300 200 0 3846 1960
PRIVATE 2940 3780 205 205 0 3145 3985
ALL INDIA 11366 8710 1305 795 500 0 13171 9505
(iii) CAPACITY ADDITION ACHIEVEMENT FOR 2018-19 (IN MW)
TARGET ACH TARGET ACH TARGET ACH TARGET ACH
CENTRAL 2760 1960 710 110 0 0 3470 2070
STATE 4506 2850 130 30 0 0 4636 2880
PRIVATE 0 972 0 0 0 0 0 972
ALL INDIA 7266 5782 840 140 0 0 8106 5922
12
SECTOR
SECTOR
TOTAL
TOTALNUCLEARHYDROTHERMAL
1 Capacity Addtion Targets and Achievements in the 12th Plan amp upto March2019
SECTORTHERMAL HYDRO NUCLEAR TOTAL
(MW)
Cummulative
Deviation
Target Achievement Target Achievement (+) (-)
Central 6040 500 0 500 0 -500
State 425615 660 0 660 0 -660
Private 0 0 0 0 0 0
Total 1029615 1160 0 1160 0 -1160
Central 600 0 0 0 0 0
State 21099 0 0 0 0 0
Private 379 0 0 0 0 0
Total 118999 0 0 0 0 0
Nuclear Central 700 0 0 0 0 0
Central 7340 500 0 500 0 -500
State 446714 660 0 660 0 -660
Private 379 0 0 0 0 0
Total 1218614 1160 0 1160 0 -1160
Electricity Generation (MU) Targets and Achievements for 2016-17
13
Hydro
All India
Capacity Addition TargetsAchievements during the Month of Apr-2019
Thermal
2 Capacity Addition Targets Achievements During Apr-2019
Schemes Sector
Target 2019-20
Apr-19 to Apr-19Apr-19
11
60
0 0
11
60
0 0 0 0
0
200
400
600
800
1000
1200
1400
Thermal Hydro Nuclear Total
MW
Targets and Achievement during 2019-20Target Achievement
0
200
400
600
800
1000
1200
Thermal Hydro Nuclear Total
1160
0 0
1160
0 0 00
MW
Target Achievement
Coal Lignite Gas Diesel Total
State 1634400 25000 287920 000 1947320 000 869755 69956 2887031
Private 2168083 108000 55800 000 2331883 000 251400 1312046 3895329
Central 1233537 25000 234406 000 1492943 162000 849622 37900 2542465
Sub Total 5036020 158000 578126 000 5772146 162000 1970777 1419902 9324825
State 2156000 104000 284982 000 2544982 000 544650 54789 3144421
Private 3474567 50000 467600 000 3992167 000 48100 2186476 6226743
Central 1650295 000 328067 000 1978362 184000 162000 66630 2390992
Sub Total 7280862 154000 1080649 000 8515511 184000 754750 2307894 11762155
State 1993250 000 79198 28788 2101236 000 1177483 58688 3337407
Private 1187450 25000 532210 27370 1772030 000 000 3749140 5521170
Central 1123502 289000 35958 000 1448460 332000 000 54190 1834650
Sub Total 4304202 314000 647366 56158 5321726 332000 1177483 3862018 10693227
State 624000 000 10000 000 634000 000 353792 27511 1015303
Private 638700 000 000 000 638700 000 39900 111637 790237
Central 1483664 000 000 000 1483664 000 100520 1000 1585184
Sub Total 2746364 000 10000 000 2756364 000 494212 140148 3390724
State 000 000 49771 3600 53371 000 42200 23325 118895
Private 000 000 2450 000 2450 000 000 6104 8554
Central 77002 000 125360 000 202362 000 100500 3000 305862
Sub Total 77002 000 177581 3600 258183 000 142700 32429 433311
State 000 000 000 4005 4005 000 000 525 4530
Private 000 000 000 000 000 000 000 738 738
Central 000 000 000 000 000 000 000 510 510
Sub Total 000 000 000 4005 4005 000 000 1773 5778
State 6407650 129000 711871 36393 7284913 000 2987880 234793 10507586
Private 7468800 183000 1058060 27370 8737230 000 339400 7366140 16442770
Central 5568000 314000 723791 000 6605791 678000 1212642 163230 8659663
Total 19444450 626000 2493722 63763 22627934 678000 4539922 7764163 35610019
Figures at decimal may not tally due to rounding off
Note -
(As per latest information available with MNRE)
Break up of RES all India as on 31032019 is given below (in MW)
459315 3562597 2818071 7764163
A 0 MW
B Apr 2019 0 MW
C
Apr 2019 0 MW
D Net Capacity Added during Apr 2019 A-B-C 0 MW
Sector wise breakup of RES capacity as shown is provisional
Share of installed capacity of BBMB Stations is included in state sector of partner states
BM PowerCogen Waste to Energy
910350 13830
Capacity Added during Apr 2019
Capacity Retired during
Capacity removed due to change
from Conventional to RES during
Islands
ALL INDIA
Abbreviation- SHP=Small Hydro Project (le 25 MW) BP=Biomass Power UampI=Urban amp Industrial Waste Power RES=Renewable Energy Sources
1 RES include SHP BP UampI Solar and Wind Energy Installed capacity in respect of RES (MNRE) as on 31032019
Small
Hydro PowerWind Power
Bio-PowerSolar Power
Total
Capacity
RES
(MNRE)
Northern Region
Western Region
Southern Region
Eastern Region
North Eastern
Region
ALL INDIA INSTALLED CAPACITY (IN MW) OF POWER STATIONS
(As on 30042019)
(UTILITIES)
Region Ownership Sector
Mode wise breakup
Grand TotalThermalNuclear Hydro
Coal Lignite Gas Diesel Total
State 13500 000 180040 000 193540 000 000 000 193540
Private 86922 000 10800 000 97722 000 000 17889 115611
Central 311272 000 20701 000 331973 10283 72309 000 414565
Sub-Total 411694 000 211541 000 623235 10283 72309 17889 723716
State 272000 000 15000 000 287000 000 110282 6930 404212
Private 408078 000 000 000 408078 000 20000 34512 462590
Central 129472 000 53561 000 183034 10094 66370181 500 259998
Sub-Total 809550 000 68561 000 878112 10094 196652 41942 1126799
State 000 000 000 000 000 000 69460 25661 95121
Private 000 000 000 000 000 000 99200 62668 161868
Central 18340 000 6201 000 24541 2895 122388 000 149824
Sub-Total 18340 000 6201 000 24541 2895 291048 88329 406813
State 000 000 17500 000 17500 000 123000 12903 153403
Private 000 000 000 000 000 000 000 6483 6483
Central 50639 000 12907 000 63547 6798 109188 000 179533
Sub-Total 50639 000 30407 000 81047 6798 232188 19386 339419
State 176000 000 15000 000 191000 000 259770 12780 463550
Private 511550 000 000 000 511550 000 28800 115462 655812
Central 85458 000 26401 000 111859 19681 92342 000 223882
Sub-Total 773008 000 41401 000 814409 19681 380912 128242 1343244
State 626000 25000 60380 000 711380 000 109618 2385 823383
Private 280200 108000 000 000 388200 000 10400 730181 1128781
Central 95625 25000 22110 000 142735 55674 73901 34400 306710
Sub-Total 1001825 158000 82490 000 1242315 55674 193919 766966 2258874
State 546900 000 000 000 546900 000 72410 2510 621820
Private 871433 000 000 000 871433 000 84200 288760 1244393
Central 379639 000 54949 000 434588 28948 180253 3000 646789
Sub-Total 1797972 000 54949 000 1852921 28948 336863 294270 2513002
State 000 000 000 000 000 000 125215 6787 132002
Private 9900 000 45000 000 54900 000 8800 52620 116320
Central 34324 000 6966 000 41290 3124 47554 000 91968
Sub-Total 44224 000 51966 000 96190 3124 181569 59407 340290
State 000 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 000 3471 3471
Central 3815 000 1503 000 5317 801 10171 000 16289
Sub-Total 3815 000 1503 000 5317 801 10171 3471 19760
124953 000 29105 000 154058 23703 75145 000 252907
State 1634400 25000 287920 000 1947320 000 869755 69956 2887031
Private 2168083 108000 55800 000 2331883 000 251400 1312046 3895329
Central 1233537 25000 234406 000 1492943 162000 849622 37900 2542465
Grand Total 5036020 158000 578126 000 5772146 162000 1970777 1419902 9324825
Delhi
Haryana
Himachal Pradesh
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
NORTHERN REGION
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
(As on 30042019)
State Ownership Sector
Mode wise breakup
Grand TotalThermalNuclear Hydro
RES
(MNRE)
Jammu amp Kashmir
Punjab
Rajasthan
Uttar Pradesh
Uttarakhand
Chandigarh
Central - Unallocated
Total (Northern
Region)
(As on 30042019)
Coal Lignite Gas Diesel Total
State 000 000 000 000 000 000 000 005 005
Private 000 000 4800 000 4800 000 000 392 5192
Central 46959 000 1967 000 48926 2600 000 000 51526
Sub-Total 46959 000 6767 000 53726 2600 000 397 56723
State 000 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 000 1447 1447
Central 14141 000 4334 000 18475 700 000 000 19175
Sub-Total 14141 000 4334 000 18475 700 000 1447 20622
State 371000 104000 217782 000 692782 000 77200 6470 776452
Private 726567 50000 396000 000 1172567 000 000 833180 2005747
Central 324243 000 42400 000 366643 55900 000 24330 446873
Sub-Total 1421810 154000 656182 000 2231992 55900 77200 863980 3229072
State 540000 000 000 000 540000 000 170366 8396 718762
Private 617400 000 10000 000 627400 000 000 418040 1045440
Central 334238 000 25700 000 359938 27300 152000 30000 569238
Sub-Total 1491638 000 35700 000 1527338 27300 322366 456436 2333440
State 228000 000 000 000 228000 000 12000 1105 241105
Private 885000 000 000 000 885000 000 000 52430 937430
Central 211075 000 000 000 211075 4800 10000 000 225875
Sub-Total 1324075 000 000 000 1324075 4800 22000 53535 1404410
State 1017000 000 67200 000 1084200 000 285084 38813 1408097
Private 1245600 000 56800 000 1302400 000 48100 880441 2230941
Central 466780 000 227273 000 694053 69000 000 12300 775353
Sub-Total 2729380 000 351273 000 3080653 69000 333184 931553 4414390
State 000 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 000 546 546
Central 19560 000 6634 000 26194 900 000 000 27094
Sub-Total 19560 000 6634 000 26194 900 000 546 27640
233300 000 19759 000 253059 22800 000 000 275859
State 2156000 104000 284982 000 2544982 000 544650 54789 3144421
Private 3474567 50000 467600 000 3992167 000 48100 2186476 6226743
Central 1650295 000 328067 000 1978362 184000 162000 66630 2390992
Grand Total 7280862 154000 1080649 000 8515511 184000 754750 2307894 11762155
Goa
Daman amp Diu
Gujarat
Madhya Pradesh
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
WESTERN REGION
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
ThermalNuclear Hydro
RES
(MNRE)
State Ownership Sector
Mode wise breakup
Grand Total
Chhattisgarh
Maharashtra
Dadra amp Nagar
Naveli
Central - Unallocated
Total (Western
Region)
(As on 30042019)
Coal Lignite Gas Diesel Total
State 501000 000 23540 000 524540 000 167360 5618 697518
Private 387388 000 381318 3680 772386 000 000 743342 1515728
Central 154683 12773 000 000 167456 12727 000 25000 205183
Sub-Total 1043071 12773 404858 3680 1464382 12727 167360 773960 2418429
State 558250 000 000 000 558250 000 247993 4122 810365
Private 83945 000 83182 000 167127 000 000 393644 560771
Central 180685 14927 000 000 195612 14873 000 1000 211485
Sub-Total 822880 14927 83182 000 920989 14873 247993 398766 1582621
State 502000 000 000 12792 514792 000 358660 19389 892841
Private 195850 000 000 2520 198370 000 000 1363591 1561961
Central 242780 40140 000 000 282920 69800 000 000 352720
Sub-Total 940630 40140 000 15312 996082 69800 358660 1382979 2807521
State 000 000 000 15996 15996 000 185650 17290 218936
Private 61500 000 17400 000 78900 000 000 19021 97921
Central 86142 28180 35958 000 150280 36200 000 5000 191480
Sub-Total 147642 28180 53358 15996 245176 36200 185650 41311 508337
State 432000 000 52408 000 484408 000 217820 12270 714498
Private 458767 25000 50310 21170 555247 000 000 1229228 1784475
Central 302532 136420 000 000 438952 144800 000 23190 606942
Sub-Total 1193299 161420 102718 21170 1478607 144800 217820 1264688 3105915
State 000 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 000 000 000
Central 000 10000 000 000 10000 000 000 000 10000
Sub-Total 000 10000 000 000 10000 000 000 000 10000
State 000 000 3250 000 3250 000 000 000 3250
Private 000 000 000 000 000 000 000 314 314
Central 14080 10760 000 000 24840 8600 000 000 33440
Sub-Total 14080 10760 3250 000 28090 8600 000 314 37004
142600 35800 000 000 178400 45000 000 000 223400
State 1993250 000 79198 28788 2101236 000 1177483 58688 3337407
Private 1187450 25000 532210 27370 1772030 000 000 3749140 5521170
Central 1123502 289000 35958 000 1448460 332000 000 54190 1834650
Grand Total 4304202 314000 647366 56158 5321726 332000 1177483 3862018 10693227
Kerala
Andhra Pradesh
Telangana
Karnataka
Total (Southern
Region)
Tamil Nadu
NLC
Puducherry
Central - Unallocated
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
SOUTHERN REGION
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
State Ownership Sector
Mode wise breakup
Grand TotalThermalNuclear Hydro
RES
(MNRE)
(As on 30042019)
Coal Lignite Gas Diesel Total
State 000 000 000 000 000 000 000 7070 7070
Private 28100 000 000 000 28100 000 000 25545 53645
Central 384933 000 000 000 384933 000 11000 000 395932
Sub-Total 413033 000 000 000 413033 000 11000 32615 456647
State 42000 000 000 000 42000 000 13000 405 55405
Private 73000 000 000 000 73000 000 000 3495 76495
Central 39374 000 000 000 39374 000 6100 000 45474
Sub-Total 154374 000 000 000 154374 000 19100 3900 177374
State 540000 000 10000 000 550000 000 98600 12195 660795
Private 243700 000 000 000 243700 000 000 35250 278950
Central 76077 000 000 000 76077 000 41000 000 117077
Sub-Total 859777 000 10000 000 869777 000 139600 47445 1056822
State 000 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 000 000 000
Central 698504 000 000 000 698504 000 18620 000 717124
Sub-Total 698504 000 000 000 698504 000 18620 000 717124
State 42000 000 000 000 42000 000 206192 2630 250822
Private 293900 000 000 000 293900 000 000 47346 341246
Central 163390 000 000 000 163390 000 8900 1000 173290
Sub-Total 499290 000 000 000 499290 000 215092 50976 765358
State 000 000 000 000 000 000 36000 5211 41211
Private 000 000 000 000 000 000 39900 001 39901
Central 8703 000 000 000 8703 000 6400 000 15103
Sub-Total 8703 000 000 000 8703 000 82300 5212 96215
112683 000 000 000 112683 000 8501 000 121184
State 624000 000 10000 000 634000 000 353792 27511 1015303
Private 638700 000 000 000 638700 000 39900 111637 790237
Central 1483664 000 000 000 1483664 000 100520 1000 1585184
Grand Total 2746364 000 10000 000 2756364 000 494212 140148 3390724
Total (Eastern
Region)
Bihar
Jharkhand
West Bengal
DVC
Odisha
Sikkim
Central - Unallocated
HydroOwnership Sector
Mode wise breakup
Grand TotalThermalNuclear
RES
(MNRE)
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
State
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
EASTERN REGION
(As on 30042019)
Coal Lignite Gas Diesel Total
State 000 000 32821 000 32821 000 10000 501 43322
Private 000 000 2450 000 2450 000 000 2650 5100
Central 40852 000 43556 000 84408 000 35708 2500 122616
Sub-Total 40852 000 78827 000 119679 000 45708 5651 171038
State 000 000 000 000 000 000 000 10711 10711
Private 000 000 000 000 000 000 000 2939 2939
Central 3705 000 4682 000 8387 000 11655 000 20042
Sub-Total 3705 000 4682 000 8387 000 11655 13650 33692
State 000 000 000 000 000 000 32200 3253 35453
Private 000 000 000 000 000 000 000 012 012
Central 4560 000 10969 000 15529 000 7227 000 22756
Sub-Total 4560 000 10969 000 15529 000 39427 3265 58221
State 000 000 16950 000 16950 000 000 1601 18551
Private 000 000 000 000 000 000 000 009 009
Central 5610 000 43695 000 49305 000 6849 500 56654
Sub-Total 5610 000 60645 000 66255 000 6849 2110 75214
State 000 000 000 3600 3600 000 000 545 4145
Private 000 000 000 000 000 000 000 344 344
Central 4710 000 7157 000 11867 000 9534 000 21401
Sub-Total 4710 000 7157 3600 15467 000 9534 889 25890
State 000 000 000 000 000 000 000 3067 3067
Private 000 000 000 000 000 000 000 100 100
Central 3210 000 4893 000 8103 000 5733 000 13836
Sub-Total 3210 000 4893 000 8103 000 5733 3167 17003
State 000 000 000 000 000 000 000 3647 3647
Private 000 000 000 000 000 000 000 050 050
Central 3105 000 4046 000 7151 000 9794 000 16945
Sub-Total 3105 000 4046 000 7151 000 9794 3697 20642
11250 000 6362 000 17612 000 14000 000 31612
State 000 000 49771 3600 53371 000 42200 23325 118895
Private 000 000 2450 000 2450 000 000 6104 8554
Central 77002 000 125360 000 202362 000 100500 3000 305862
Grand Total 77002 000 177581 3600 258183 000 142700 32429 433311
Assam
Arunachal Pradesh
Meghalaya
Tripura
Manipur
Nagaland
Mizoram
Central - Unallocated
Total (North-
Eastern Region)
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
NORTH-EASTERN REGION
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
State Ownership Sector
Mode wise breakup
Grand TotalThermalNuclear Hydro
RES
(MNRE)
(As on 30042019)
Coal Lignite Gas Diesel Total
State 000 000 000 4005 4005 000 000 525 4530
Private 000 000 000 000 000 000 000 663 663
Central 000 000 000 000 000 000 000 510 510
Sub-Total 000 000 000 4005 4005 000 000 1698 5703
State 000 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 000 075 075
Central 000 000 000 000 000 000 000 000 000
Sub-Total 000 000 000 000 000 000 000 075 075
State 000 000 000 4005 4005 000 000 525 4530
Private 000 000 000 000 000 000 000 738 738
Central 000 000 000 000 000 000 000 510 510
Grand Total 000 000 000 4005 4005 000 000 1773 5778
Andaman amp
Nicobar
Lakshadweep
Total (Islands)
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
ISLANDS
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
State Ownership Sector
Mode wise breakup
Grand TotalThermalNuclear Hydro
RES
(MNRE)
SrNo Contents Page
1 Executive summary of Target and Achievement of Transmission Lines during 2019-20
20(1)
2 List of Transmission Lines CommissionedReady for commissioning during Apr-2019 20(2)
Section C - Transmission Lines
1 Executive summary of Target and Achievement of Transmission Lines during 2019-20 As on 30-04-19
(All figures in circuit kms)
Ce
ntr
al S
ecto
r
Sta
te S
ecto
r
JV
Pri
va
te S
ecto
r
To
tal
Ce
ntr
al S
ecto
r
Sta
te S
ecto
r
JV
Pri
va
te S
ecto
r
To
tal
Ce
ntr
al S
ecto
r
Sta
te S
ecto
r
JV
Pri
va
te S
ecto
r
To
tal
Ce
ntr
al S
ecto
r
Sta
te S
ecto
r
JV
Pri
va
te S
ecto
r
To
tal
Ce
ntr
al S
ecto
r
Sta
te S
ecto
r
JV
Pri
va
te S
ecto
r
To
tal
Ce
ntr
al
Se
cto
r
Sta
te S
ec
tor
JV
Pri
va
te S
ec
tor
Gra
nd
To
tal
0 0 0 0 0 0 0 0 2727 958 2334 6019 2239 3416 1143 6798 781 10023 0 10804 5747 14397 3477 23621
Apr19 Programme 0 0 0 0 0 0 0 0 577 416 557 1550 60 890 203 1153 0 309 0 309 637 1615 760 3012
Achievement 0 0 0 0 0 0 0 0 53 0 0 53 0 20 0 20 0 401 0 401 53 421 0 474
Upto Apr-19 Programme 0 0 0 0 0 0 0 0 577 416 557 1550 60 890 203 1153 0 309 0 309 637 1615 760 3012
Achievement 0 0 0 0 0 0 0 0 53 0 0 53 0 20 0 20 0 401 0 401 53 421 0 474
20(1)
220 kV Grand Total 800 kV 500 kV
Programme 2019-20
Programme
Achievement
HVDC765 kV 400 kV
Line
1 2 3 4 5 6
1 400 Bhadla (PG) - Bhadla (RVPN) line DC PGCIL 53
53
2 400 LILO of one ckt Jhanor - Navsari at Vav Ss DC GETCO 20
3 220 Banda-Chitrakoot Line DC UPPTCL 226
4 220 Gorakhpur (PG)-Gola line DC UPPTCL 82
5 220 Hapur(765) - Faridnagar line SC UPPTCL 11
6 220 Kalikiri - Madanapalli line DC APTRANSCO 60
7 220LILO of Gr Noida -Noida Sec-129 at Noida
Sec-148DC UPPTCL 1
8 220LILO of one Ckt of Badshahpur Pali at Sec-
65 GurgaonDC HVPNL 3
9 220 Sultanpur-Sangipur LILO Section at Amethi DC UPPTCL 18
421
0
474
20(2)
Grand Total
2Transmission Lines (220 kV and above) CommissionedReady for commissioning During Apr-2019
Voltage
Level (kV)Name of Transmission Lines
Circuit
Type
Executing
Agency
CENTRAL SECTOR
Total of CENTRAL SECTOR
STATE SECTOR Sector
Total of STATE SECTOR
PRIVATE SECTOR
Total of PRIVATE SECTOR
SlNo
Length(CKm)
As on 30-04-19
SN Contents Page
1 Executive summary of Target and Achievement of Substations during 2019-20 21(1)
2Sub Stations (220 kV and above) commissionedready for commisssioning during Apr-
201921(2)
Section D - Sub Stations
1 Executive summary of Target and Achievement of Substations during 2019-2020 As on 30-04-19
(All figures in circuit MVA)
Ce
ntr
al S
ecto
r
Sta
te S
ecto
r
JV
Pri
va
te S
ecto
r
To
tal
Ce
ntr
al S
ecto
r
Sta
te S
ecto
r
JV
Pri
va
te S
ecto
r
To
tal
Ce
ntr
al S
ecto
r
Sta
te S
ecto
r
JV
Pri
va
te S
ecto
r
To
tal
Ce
ntr
al S
ecto
r
Sta
te S
ecto
r
JV
Pri
va
te S
ecto
r
To
tal
Ce
ntr
al S
ecto
r
Sta
te S
ecto
r
JV
Pri
va
te S
ecto
r
To
tal
Ce
ntr
al S
ec
tor
Sta
te S
ec
tor
JV
Pri
va
te S
ec
tor
Gra
nd
To
tal
3000 0 0 3000 0 0 0 0 18000 3000 6000 27000 5205 19665 4260 29130 800 21786 0 22586 27005 44451 10260 81716
Apr19 Programme 0 0 0 0 0 0 0 0 3000 0 3000 6000 0 1000 2000 3000 0 800 0 800 3000 1800 5000 9800
Achievement 0 0 0 0 0 0 0 0 500 0 0 500 815 1980 0 2795 0 1305 0 1305 1315 3285 0 4600
Upto Apr-19 Programme 0 0 0 0 0 0 0 0 3000 0 3000 6000 0 1000 2000 3000 0 800 0 800 3000 1800 5000 9800
Achievement 0 0 0 0 0 0 0 0 500 0 0 500 815 1980 0 2795 0 1305 0 1305 1315 3285 0 4600
21(1)
220 kV Grand Total 800 kV 500 kV
Programme 2019-20
Programme
Achievement
HVDC765 kV 400 kV
As on 30-04-19
Sl Voltage Ratio Capacity
No (kVkV) (MWMVA)
1 2 3 4 5
1 Bhadla SS (3x1500 3x500 MVA) 765400 PGCIL 500
2 Extn at Tumkur (Pavagada ) PS (2x500 MVA) 400220 PGCIL 500
3 Bongaigaon (2nd ICT) Ss 400220 PGCIL 315
Total of CENTRAL SECTOR 1315
4 Motiram Adda Gorakhpur (Aug) (Additional TF) 400220 UPPTCL 240
5 Muradnagar-II Ghaziabad (Aug) (Additional TF) 400220 UPPTCL 240
6 Noida Sec- 148 GBNagar (New) 400220 UPPTCL 5007 Sarnath Varanasi (Aug) TF- II (500-315) 400220 UPPTCL 1858 Sarojininagar Lucknow Aug) TF- II (500-315) 400220 UPPTCL 185
9 Unnao (Aug) TF-III 400220 UPPTCL 31510 Nawada SS 400220 HVPNL 31511 Kharepatan SS 22033 MSETCL 2512 Prathipadu SS 220132 APTRANSCO 10013 Pali Ss 22066 HVPNL 160
14 A-5 Faridabad Ss 22066 HVPNL 60
15 Rentachintala Ss Aug(3X100-2x100) 220132 APTRANSCO 10016 Amethi Ss 220132 UPPTCL 160
17 Gajokhar Varanasi (Aug) TF- II (160-100) 220132 UPPTCL 60
18 Gola Gorakhpur (New) 220132 UPPTCL 160
19 Khurja Bulandshahr (Aug) TF- II (200-160) 220132 UPPTCL 40
20 RC Green GB Nagar (Aug) TF-II (160-100) 220132 UPPTCL 60
21 Sikandrabad Bulandshahr (Aug) (Additional TF) 220132 UPPTCL 160
22 Sitapur (Aug) (Additional TF) 220132 UPPTCL 160
23 Sohawal Ayodhya (Aug) TF-II (160-100) 220132 UPPTCL 60
TOTAL STATE SECTOR 3285
GRAND TOTAL 4600
21(2)
CENTRAL SECTOR
STATE SECTOR
2Sub-Stations (220 kV and above) CommissionedReady for commissioning During Apr-2019
Name of Sub Stations Executing Agency
SN Contents Page
1 Electricity Generation (MU) Targets and Achievements for 2019-20 22
Section E - Electricity Generation
Programme Achievement Ach Programme Achievement Ach
Central Sector 37545100 3177900 3129530 9848 3177900 3129530 9848
State Sector 37498600 3322500 2950558 8881 3322500 2950558 8881
PvtIPP Sector 37346200 3236400 3195940 9875 3236400 3195940 9875
PvtUTL Sector 1823100 159300 165579 10394 159300 165579 10394
Total 114213000 9896100 9441607 9541 9896100 9441607 9541
Central Sector 5661700 386100 481390 12468 386100 481390 12468
State Sector 6680500 498200 536514 10769 498200 536514 10769
PvtIPP Sector 1206900 57300 80405 14032 57300 80405 14032
PvtUTL Sector 144100 12300 10930 8886 12300 10930 8886
Total 13693200 953900 1109239 11628 953900 1109239 11628
Central Sector 4472000 367300 317765 8651 367300 317765 8651
Total 4472000 367300 317765 8651 367300 317765 8651
Bhutan Import 621800 17500 24396 13941 17500 24396 13941
Central Sector 47678800 3931300 3928685 9993 3931300 3928685 9993
State Sector 44179100 3820700 3487072 9127 3820700 3487072 9127
Pvt Sector 40520300 3465300 3452854 9964 3465300 3452854 9964
Total 133000000 11234800 10893007 9696 11234800 10893007 9696
Provisional based on actual-cum-Assesment
Figs in MU
Cummulative
Achievement
Cummulative
Achievement
Mar-19 Mar-18 Upto Mar-2019 Upto Mar-2018
984785 869291 12675910 10183949
22
1 Electricity Generation (MU) Targets and Achievememts for 2019-20
All India Energy Generation During Apr-19 to Apr-19 (MU)
Target (2019-20)Apr-19 to Apr-19
Sector
Hydro
Thermal
Nuclear
Renewable Energy Generation
Achievement
Apr-2019
98961
95393673
112348
94416
11092
3178
108930
0
20000
40000
60000
80000
100000
120000
Thermal Hydro Nuclear Total
Programme
Achievement
SN Contents Page
1 Energy Power Supply Position (Provisional) for Apr-2019 and during Apr-19 to Apr-19 23
2 Peak Power Supply Position (Provisional) for Apr-2019 and during Apr-19 to Apr-19 24
3 Energy Power Supply Position (Revised) for Mar-2019 and during Apr-19 to Mar-19 25
4 Peak Power Supply Position (Revised) for Mar-2019 and during Apr-19 to Mar-19 26
5 Notified Power cuts Restrictions on Industries during Apr-2019 27
6 Power Supply to Agricultural Sector during Apr-2019 28
Section F - Power supply position
आकड़ मममलयन यननट नट Figures in MU net
ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied
कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )
चडीगढ़ Chandigarh 117 117 0 00 117 117 0 00
दिलली Delhi 2698 2698 1 00 2698 2698 1 00
हरियजणज Haryana 3773 3773 0 00 3773 3773 0 00
दहमजचल परिश Himachal Pradesh 777 777 0 00 777 777 0 00
रमम कशमीि Jammu amp Kashmir 1604 1296 308 192 1604 1296 308 192
परजब Punjab 3646 3646 0 00 3646 3646 0 00
िजरसथजन Rajasthan 6210 6208 2 00 6210 6208 2 00
उतति परिश Uttar Pradesh 10179 10148 32 03 10179 10148 32 03
उततिजखड Uttarakhand 1120 1120 0 00 1120 1120 0 00
उततरी कषतर Northern Region 30094 29786 308 10 30094 29786 308 10
छततीसगढ़ Chhattisgarh 2684 2676 8 03 2684 2676 8 03
गरिजत Gujarat 10718 10718 0 00 10718 10718 0 00
मधय परिश Madhya Pradesh 6006 6006 0 00 6006 6006 0 00
महजिजषटर Maharashtra 14308 14308 0 00 14308 14308 0 00
िमन औि दिउ Daman amp Diu 220 220 0 00 220 220 0 00
िजिि व नगि हवली Dadra amp Nagar Haveli 552 552 0 00 552 552 0 00
गोवज Goa 388 388 0 00 388 388 0 00
पशचिमी कषतर Western Region 34875 34868 8 00 34875 34868 8 00
आनधर परिश Andhra Pradesh 5708 5708 0 00 5708 5708 0 00
तलगजनज Telangana 5725 5725 0 00 5725 5725 0 00
कनजाटक Karnataka 7003 7003 0 00 7003 7003 0 00
किल Kerala 2402 2400 2 01 2402 2400 2 01
तममल नजड Tamil Nadu 10010 10010 0 00 10010 10010 0 00
पडचिी Puducherry 263 263 0 00 263 263 0 00
लकष-दवीप Lakshadweep 4 4 0 0 4 4 0 0
दकषकषणी कषतर Southern Region 31111 31109 2 00 31111 31109 2 00
बबहजि Bihar 2589 2589 0 00 2589 2589 0 00
िजमोिि घजटी ननगम DVC 1772 1772 0 00 1772 1772 0 00
झजिखणड Jharkhand 689 689 0 00 689 689 0 00
ओडडशज Odisha 2689 2689 1 00 2689 2689 1 00
पशशचम बगजल West Bengal 5075 5075 0 00 5075 5075 0 00
मसशककम Sikkim 37 37 0 00 37 37 0 00
अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 7 29 27 2 7
परवी कषतर Eastern Region 12851 12850 1 00 12851 12850 1 00
अरणजचल परिश Arunachal Pradesh 66 66 0 05 66 66 0 05
असम Assam 766 709 57 75 766 709 57 75
मणणपि Manipur 68 67 1 15 68 67 1 15
मघजलय Meghalaya 170 160 10 59 170 160 10 59
ममज़ोिम Mizoram 54 53 0 08 54 53 0 08
नजगजलड Nagaland 54 54 0 08 54 54 0 08
बिपिज Tripura 122 120 1 12 122 120 1 12
उततर-परवी कषतर North-Eastern Region 1300 1228 71 55 1300 1228 71 55
समपणण भारत All India 110231 109842 389 04 110231 109842 389 04
23
ऊरजा पनत ा म कमी ऊरजा पनत ा म कमीEnergy not Supplied
Excludes energy exported to Bangladesh
Energy not Supplied
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
ऊराण वरवदयत आपरत ण शथिरत ररपोरण (परवाणरवलोकन) Energy Power Supply Position Report (Provisional)
राजयState
अपरल 2019 April2019 अपरल2019 -अपरल2019 April2019 to April2019
अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met
कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )
चडीगढ़ Chandigarh 256 256 0 00 256 256 0 00
दिलली Delhi 5664 5664 0 00 5664 5664 0 00
हरियजणज Haryana 8127 8127 0 00 8127 8127 0 00
दहमजचल परिश Himachal Pradesh 1387 1387 0 00 1387 1387 0 00
रमम कशमीि Jammu amp Kashmir 2826 2261 565 200 2826 2261 565 200
परजब Punjab 7015 7015 0 00 7015 7015 0 00
िजरसथजन Rajasthan 10560 10560 0 00 10560 10560 0 00
उतति परिश Uttar Pradesh 19935 19935 0 00 19935 19935 0 00
उततिजखड Uttarakhand 1922 1922 0 00 1922 1922 0 00
उततरी कषतर Northern Region 54476 53985 491 09 54476 53985 491 09
छततीसगढ़ Chhattisgarh 4596 4574 22 05 4596 4574 22 05
गरिजत Gujarat 17871 17865 6 00 17871 17865 6 00
मधय परिश Madhya Pradesh 10018 10018 0 00 10018 10018 0 00
महजिजषटर Maharashtra 23158 23150 8 00 23158 23150 8 00
िमन औि दिउ Daman amp Diu 341 340 1 02 341 340 1 02
िजिि व नगि हवली Dadra amp Nagar Haveli 818 818 0 00 818 818 0 00
गोवज Goa 594 594 0 00 594 594 0 00
पशचिमी कषतर Western Region 56242 56222 20 00 56242 56222 20 00
आनधर परिश Andhra Pradesh 9151 9151 0 00 9151 9151 0 00
तलगजनज Telangana 10191 10191 0 00 10191 10191 0 00
कनजाटक Karnataka 12681 12681 0 00 12681 12681 0 00
किल Kerala 4309 4300 8 02 4309 4300 8 02
तममल नजड Tamil Nadu 15972 15972 0 00 15972 15972 0 00
पडचिी Puducherry 482 480 2 05 482 480 2 05
लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0
दकषकषणी कषतर Southern Region 49155 49103 52 01 49155 49103 52 01
बबहजि Bihar 5357 5357 0 00 5357 5357 0 00
िजमोिि घजटी ननगम DVC 3039 3039 0 00 3039 3039 0 00
झजिखणड Jharkhand 1266 1266 0 00 1266 1266 0 00
ओडडशज Odisha 5389 5389 0 00 5389 5389 0 00
पशशचम बगजल West Bengal 8666 8666 0 00 8666 8666 0 00
मसशककम Sikkim 100 100 0 00 100 100 0 00
अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7
परवी कषतर Eastern Region 23349 23349 0 00 23349 23349 0 00
अरणजचल परिश Arunachal Pradesh 139 136 3 22 139 136 3 22
असम Assam 1712 1667 45 26 1712 1667 45 26
मणणपि Manipur 197 188 9 46 197 188 9 46
मघजलय Meghalaya 336 336 0 00 336 336 0 00
ममज़ोिम Mizoram 116 113 3 26 116 113 3 26
नजगजलड Nagaland 157 131 26 166 157 131 26 166
बिपिज Tripura 292 291 1 03 292 291 1 03
उततर-परवी कषतर North-Eastern Region 2848 2780 68 24 2848 2780 68 24
समपणण भारत All India 177411 176810 601 03 177411 176810 601 03
24
मजग की पनत ा म कमी Demand not Met
Excludes the supply to Bangladesh
राजयStateअपरल 2019 April2019
मजग की पनत ा म कमी Demand not Met
अधिकतम वरवदयत आपरत ण शथिरत ररपोरण (परवाणरवलोकन) Peak Power Supply Position Report (Provisional)
आकड़ मगज वजट नट Figures in MW netअपरल2019 -अपरल2019 April2019 to April2019
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
आकड़ मममलयन यननट नट Figures in MU net
ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied
कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )
चडीगढ़ Chandigarh 96 96 0 00 1561 1561 0 00
दिलली Delhi 1931 1930 1 00 32299 32282 17 01
हरियजणज Haryana 3658 3658 0 00 53665 53665 0 00
दहमजचल परिश Himachal Pradesh 832 830 2 02 9850 9618 232 24
रमम कशमीि Jammu amp Kashmir 1767 1414 353 200 19593 15868 3725 190
परजब Punjab 3585 3585 0 00 55288 55275 13 00
िजरसथजन Rajasthan 6774 6770 4 01 79826 79637 189 02
उतति परिश Uttar Pradesh 8754 8691 63 07 117101 116118 984 08
उततिजखड Uttarakhand 1067 1067 0 00 13845 13753 92 07
उततरी कषतर Northern Region 28464 28041 423 15 383028 377776 5251 14
छततीसगढ़ Chhattisgarh 2464 2457 8 03 26130 26076 54 02
गरिजत Gujarat 9890 9890 0 00 116588 116572 15 00
मधय परिश Madhya Pradesh 6236 6236 0 00 75667 75665 2 00
महजिजषटर Maharashtra 13631 13631 0 00 158285 158148 137 01
िमन औि दिउ Daman amp Diu 221 221 0 00 2557 2557 0 00
िजिि व नगि हवली Dadra amp Nagar Haveli 553 553 0 00 6317 6317 0 00
गोवज Goa 362 362 0 00 4283 4280 3 01
पशचिमी कषतर Western Region 33357 33349 8 00 389827 389615 212 01
आनधर परिश Andhra Pradesh 6072 6071 1 00 63735 63677 58 01
तलगजनज Telangana 6930 6929 1 00 66697 66635 62 01
कनजाटक Karnataka 7614 7612 1 00 71759 71690 69 01
किल Kerala 2489 2488 1 00 25029 24911 118 05
तममल नजड Tamil Nadu 10247 10245 2 00 109375 109273 102 01
पडचिी Puducherry 252 251 1 04 2761 2751 10 03
लकष-दवीप Lakshadweep 4 4 0 0 46 46 0 0
दकषकषणी कषतर Southern Region 33605 33597 8 00 339355 338938 417 01
बबहजि Bihar 2319 2318 1 00 30052 29827 225 07
िजमोिि घजटी ननगम DVC 1773 1772 1 00 22365 21995 369 17
झजिखणड Jharkhand 698 697 1 01 8682 8461 221 25
ओडडशज Odisha 2583 2582 1 00 31810 31781 30 01
पशशचम बगजल West Bengal 4585 4584 2 00 52237 52078 159 03
मसशककम Sikkim 41 41 0 00 513 512 0 01
अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 67 346 323 23 67
परवी कषतर Eastern Region 11999 11995 5 00 145658 144654 1004 07
अरणजचल परिश Arunachal Pradesh 61 60 0 06 864 855 9 10
असम Assam 680 656 23 34 9532 9204 328 34
मणणपि Manipur 68 68 1 09 916 906 10 11
मघजलय Meghalaya 173 173 0 03 1955 1953 1 01
ममज़ोिम Mizoram 50 49 0 09 668 661 8 12
नजगजलड Nagaland 58 57 1 20 902 809 93 103
बिपिज Tripura 150 150 0 00 1859 1837 21 11
उततर-परवी कषतर North-Eastern Region 1240 1214 26 21 16696 16225 471 28
समपणण भारत All India 108665 108196 469 04 1274564 1267209 7355 06
Note The revised data for March 2019 is not avaliable
Excludes energy exported to Bangladesh
राजयState
ऊराण वरवदयत आपरत ण शथिरत ररपोरण (परवाणरवलोकन) Energy Power Supply Position Report (Provisional)
25
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
Energy not Supplied Energy not Supplied
मािण2019 March2019 अपरल2018 -मािण2019 April2018 to March2019
ऊरजा पनत ा म कमी ऊरजा पनत ा म कमी
अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met
कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )
चडीगढ़ Chandigarh 223 223 0 00 369 369 0 00
दिलली Delhi 4016 4016 0 00 7016 7016 0 00
हरियजणज Haryana 6544 6544 0 00 10270 10270 0 00
दहमजचल परिश Himachal Pradesh 1683 1683 0 00 1700 1700 0 00
रमम कशमीि Jammu amp Kashmir 3277 2622 655 200 3277 2622 655 200
परजब Punjab 6564 6564 0 00 12638 12638 0 00
िजरसथजन Rajasthan 11885 11885 0 00 13276 13276 0 00
उतति परिश Uttar Pradesh 16220 16220 0 00 20498 20062 436 21
उततिजखड Uttarakhand 2002 2002 0 00 2216 2216 0 00
उततरी कषतर Northern Region 47925 47356 569 12 63166 61726 1440 23
छततीसगढ़ Chhattisgarh 4444 4128 316 71 4444 4270 174 39
गरिजत Gujarat 16263 16263 0 00 17053 16963 90 05
मधय परिश Madhya Pradesh 12328 12323 5 00 13815 13815 0 00
महजिजषटर Maharashtra 22361 22291 70 03 23864 23254 610 26
िमन औि दिउ Daman amp Diu 336 336 0 01 357 356 1 02
िजिि व नगि हवली Dadra amp Nagar Haveli 800 799 1 01 816 815 1 01
गोवज Goa 538 538 0 00 596 596 0 00
पशचिमी कषतर Western Region 53132 52965 167 03 56675 55821 853 15
आनधर परिश Andhra Pradesh 8977 8977 0 00 9459 9453 6 01
तलगजनज Telangana 10471 10471 0 00 10815 10815 0 00
कनजाटक Karnataka 12841 12841 0 00 12841 12841 0 00
किल Kerala 4264 4228 36 09 4264 4228 36 09
तममल नजड Tamil Nadu 15712 15712 0 00 15712 15712 0 00
पडचिी Puducherry 427 412 15 34 427 412 15 34
लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0
दकषकषणी कषतर Southern Region 49464 49464 0 00 49464 49464 0 00
बबहजि Bihar 4633 4633 0 00 5115 5084 31 06
िजमोिि घजटी ननगम DVC 3035 3035 0 00 3035 3035 0 00
झजिखणड Jharkhand 1210 1210 0 00 1339 1291 48 36
ओडडशज Odisha 4827 4827 0 00 5357 5357 0 00
पशशचम बगजल West Bengal 8287 8287 0 00 9130 9123 7 01
मसशककम Sikkim 100 100 0 00 106 106 0 00
अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7
परवी कषतर Eastern Region 21658 21658 0 00 23141 22733 408 18
अरणजचल परिश Arunachal Pradesh 133 131 2 15 138 138 0 01
असम Assam 1539 1508 31 20 1865 1809 56 30
मणणपि Manipur 204 199 5 25 219 216 3 12
मघजलय Meghalaya 357 357 0 00 374 372 1 04
ममज़ोिम Mizoram 108 105 3 28 121 119 2 17
नजगजलड Nagaland 127 125 2 16 156 138 18 116
बिपिज Tripura 249 249 0 00 298 293 5 17
उततर-परवी कषतर North-Eastern Region 2540 2535 5 02 2967 2850 117 39
समपणण भारत All India 169464 168745 719 04 177022 175528 1494 08
Note The revised data for March 2019 is not avaliable 26
अधिकतम वरवदयत आपरत ण शथिरत ररपोरण (परवाणरवलोकन) Peak Power Supply Position Report (Provisional)
आकड़ मगज वजट नट Figures in MW net
राजयStateमािण2019 March2019 अपरल2018 -मािण2019 April2018 to March2019
मजग की पनत ा म कमी मजग की पनत ा म कमी Demand not MetDemand not Met
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
Excludes the supply to Bangladesh
अपरल 2019 April2019 अपरल2018 -मािण2019 April2019 to April2019
उततरी कषतर Northern Region
चडीगढ़ Chandigarh(Data Not Received)दिलली Delhi
हरियजणज Haryana
दहमजचल परिश Himachal Pradeshरमम कशमीि Jammu amp Kashmir(Data
Not Received)परजब Punjab
िजरसथजन Rajasthanउतति परिश Uttar Pradesh
उततिजखड Uttarakhand
पशचिमी कषतर Western Region
छततीसगढ़ Chhattisgarh
Apr-Nov 2018- No cuts
Maximum Demand cut-58MW
Energy cut- 00020-00032 MUsday
गरिजत Gujarat
मधय परिश Madhya Pradesh
महजिजषटर Maharashtra
गोवज Goa
दकषकषणी कषतर Southern Region
आनधर परिश Andhra Pradesh
तलगजनज Telangana
कनजाटक Karnataka
किल Kerala
तममल नजड Tamil Nadu
पडचिी Puducherryपरवी कषतर Eastern Region
बबहजि Bihar
झजिखणड Jharkhand
ओडडशज Odisha
पशशचम बगजल West Bengal
No N
otifie
d Cu
ts
27
मािण 2019 म इडथरीर पर वरवदयत करौती का वरवरवरण Notified Power CutsRestrictions on Industries during April2019
राजय कषतर State Regionऊराणमाग करौती EnergyDemand Cut
No N
otifie
d Cu
tsNo
Notifie
d Cu
ts
अपरल2019 April 2019 अपरल2019 -अपरल2019 April2019 to April2019
उततरी कषतर Northern Region
चडीगढ़ Chandigarh Data not received Data not received
दिलली Delhi Data not received Data not received
हरियजणज Haryana 0811 hrsday 0811 hrsday
दहमजचल परिश Himachal Pradesh HPSEBL has only 2 agriculture consumers and uninterrupted
power is being supplied to agriculture sector
HPSEBL has only 2 agriculture consumers and uninterrupted
power is being supplied to agriculture sector
रमम कशमीि Jammu amp Kashmir Data not received Data not received
परजब Punjab 379 hrsday 379 hrsday
िजरसथजन Rajasthan 0630 hrsday 0630 hrsday
उतति परिश Uttar Pradesh 2157 hrsday 2157 hrsday
उततिजखड Uttarakhand 2359 hrsday 2359 hrsday
पशचिमी कषतर Western Region
छततीसगढ़ Chhattisgarh 18 hrsday 18 hrsday
गरिजत Gujarat 8 hrsday 8 hrsday
मधय परिश Madhya Pradesh Three-Phase Supply(Irrigation)- 0953 hrs day Three-Phase
(Mixed) Supply - 2334 hrs day
Three-Phase Supply(Irrigation)- 0953 hrs day Three-Phase
(Mixed) Supply - 2334 hrs day
महजिजषटर Maharashtra Three-Phase Supply(Irrigation)- 9 hrs day Three-Phase Supply(Irrigation)- 9 hrs day
गोवज Goa No restriction No restriction
दकषकषणी कषतर Southern Region
आनधर परिश Andhra Pradesh 07 hrsday 07 hrsday
तलगजनज Telangana 24 hrsday 24 hrsday
कनजाटक Karnataka 6 hrsday 6 hrsday
किल Kerala No Restrictions No Restrictions
तममल नजड Tamil Nadu 9 hrsday (6 hrs during day time and 3 hrs during night time) 9 hrsday (6 hrs during day time and 3 hrs during night time)
पडचिी Puducherry No Restrictions No Restrictions
परवी कषतर Eastern Region
बबहजि Bihar 18 hrsday 18 hrsday
झजिखणड Jharkhand 20 hrsday 20 hrsday
ओडडशज Odisha 24 hrsday 24 hrsday
पशशचम बगजल West Bengal 23 hrsday 23 hrsday
28
मारच 2019 कषि कषतर को षिदयत आपरतच का षििरण Power Supply to Agricultural Sector during March2019
राजय कषतर State Regionऔसत वरवदयत आपरत ण घनरो म Average Hours of Supply
On segregated feeders
SNo Contents Page
1 Growth of Installed Capacity since 6th Plan 29
2 Progress of Transmission Sector since 6th Plan 30
3 All India Yearly Coal consumption for Power Generation (Utilities)
4 All India Annual Per Capita Consumption of Electricity since -2006
5 Average cost of power supply amp Average realisation (Paisakwh)
6 Growth of Rural Electrification amp Pump Sets Energisation
7 Status of Hydro Schemes Cleared by the CEA in Apr-2019
Section G - Growth of Power Sector
31
32
(In MW)
Coal Gas Diesel Total
End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472
End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634
End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537
End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596
End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921
End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703
End of 12th Plan 19216288 2532938 83763 21832988 6780 4447842 50018 31960630
Up to Apr-2019 20070450 2493722 63763 22627934 678000 4539922 7764163 35610019
Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-17) = 51529 MW
Electricity Generation (MU) Targets and Achievements for 2016-17
Coal Gas Diesel Nuclear Hydro Res Total
2007045 2493722 637629 678000 453992 77641625 22925174
29
1 Growth of Installed Capacity Since 6th Plan
Plan YearThermal
Nuclear Hydro RES (MNRE) Total
2007045
2493722637629
678000
4539922
77641625
Total Installed Capacity 35610019 MW
Coal Gas Diesel Nuclear Hydro Res
Progress of Transmission Sector in the Country up to April 2019
1 TRANSMISSION LINES (All fig in CKM)
At the end of
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
6th plan 0 0 0 0 0 0 0 0 0 0 0 0 1831 4198 0 6029 1641 44364 0 46005 3472 48562 0 52034
7th plan 0 0 0 0 0 0 0 0 0 0 0 0 13068 6756 0 19824 4560 55071 0 59631 17628 61827 0 79455
8th plan 0 0 0 0 1634 0 0 1634 0 0 0 0 23001 13141 0 36142 6564 73036 0 79600 31199 86177 0 117376
9th plan 0 0 0 0 3234 1504 0 4738 751 409 0 1160 29345 20033 0 49378 8687 88306 0 96993 42017 110252 0 152269
10th plan 0 0 0 0 4368 1504 0 5872 1775 409 0 2184 48708 24730 0 73438 9444 105185 0 114629 64295 131828 0 196123
11th Plan 0 0 0 0 5948 1504 1980 9432 4839 411 0 5250 71023 30191 5605 106819 10140 125010 830 135980 91950 157116 8415 257481
12th Plan 6124 0 0 6124 5948 1504 1980 9432 25465 1177 4598 31240 92482 48240 17065 157787 11014 151276 978 163268 141033 202197 24621 367851
13th Plan (Up
to Mar2019)6124 0 0 6124 5948 1504 1980 9432 33692 1512 6605 41809 101335 58238 21173 180746 11734 162552 1010 175296 158833 223806 30768 413407
13th Plan (Up
to Apr-19)6124 0 0 6124 5948 1504 1980 9432 33745 1512 6605 41862 101335 58258 21173 180766 11734 162953 1010 175697 158886 224227 30768 413881
27150 600 MW of 132 kV Inter-Regional power transmission capacity links which are operated radially from time to time is not added in the total
75050
47900
24000
99050
30
Grand Total
Note - The figure upto the end of 10th plan in for stringing progress including the lines not commissioned Now only commissioned lines are reckoned Accordingly the figure for 10th plan (end) may read
as 187555 after adjusting with (-) 10852 Ckm
Inter-regional Power Transfer Capacity (MW)
plusmn 800 kV HVDC plusmn 500 kV HVDC 765 kV 400 kV 220 kV
IR addition in 12th
Plan (up to March
2017)
Inter-regional
Transmission
Capacity at the end
of Plan Period 2017-
22 (as on April19)
IR at the end of 11th
PlanIR at the end of 12th
Plan
IR Capacity Addition
at the end of Plan
Period 2017-22 (Till
April 19)
2004-05 27800
2005-06 28100
2006-07 30200
2007-08 33000
2008-09 35500
2009-10 36700
2010-11 38700
2011-12 41756
2012-13 45460
2013-14 48940
2014-15 53040
2015-16 54590
2016-17 57430
2017-18 60800
2018-19 62890
Year
2005-06
2006-07
2007-08
2008-09
2009-10
2010-11
2011-12
2012-13
2013-14
2014-15
2015-16
2016-17
2017-18
2018-19
2004-05 254 209 7568
2005-06 260 221 7636
2006-07 276 227 7423
2007-08 293 239 7727
2008-09 340 263 8713
2009-10 355 268 8870
2010-11 398 303 11975
2011-12 455 330 13514
2012-13 501 376 14867
2013-14 518 175
2014-15 520
Source- PFC Reports on the performance of State Power Utilities 31
1181
7335
7786
91441
8188
88363
957
1010
1075
1122
1149
(GrossGen+ Net Import) Mid-year population Provisional
5 Average cost of power supply amp average realization ( paiseKWH )
Yearcost of supply
(paiseunit)
Realization(paiseunit)
Including AgricultureOnly
Agriculture
6719
7171
3 All India yearly Coal Consumption for Power Generation (Utilities)
YEARCoal Consumption
Million Tonnes
4 All India Annual per Capita consumption of Electricity Since 2006
Per Capita Consumption ( kWh)
6314
Sl
NoExecuting Agency
Installed
Capacity (MW)Cost (Rs crore)
Date of
Clearance
32
Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as
Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received
from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made
available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified
villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is
independent of the earlier published reports
No Hydro Electric Project has been issued concurrenceAppraisal letter by CEA during April 2019
7 Status of Hydro Schemes Cleared by the CEA in Apr-2019
Name of Scheme
1999-002000-01
297594
010408 to 310309010409 to 310310
10th Plan
2005-062006-07
322968331020
6 Growth Of Rural Electrification amp Pumpsets Energisation
Plan Year
9th Plan2002-03
134092626
4111
Pump Sets Energised Villages Electricfied (Nos)
2001-02
284064367244
1218
27801997-981998-99
3207
482864
12632
1576036
4451722594
15455554
2314176
397343611750
2093311060316074
65109527813884
46708
18423975
499150
2003-042004-05
5743
9769
Cumu upto End of 10th Plan
010407 to 310308
010410 to 310311557976840909
010411 to 310312
412667
86293726
No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification
since 2004-05
65291374575 296361511th Plan
Cumu upto End of 11th Plan
596556 21212860
557439Cummulative up to end of 12th Plan
SN Contents Page
1 Rate of sale of power for the year 2016-17 33-41
RATE OF SALE OF POWER FOR THE YEAR 2016-17
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) NORTHERN REGION
CENTRAL SECTOR
BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 18000 66900 19800
CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 54000 222400 21600
CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 30000 144400 19600
CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 23100 91700 42600
PARBATI - III HPS NHPC LTD HYDRO-HYDRO 52000 68200 54800
DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 28000 95600 30000
CHUTAK NHPC LTD HYDRO-HYDRO 4400 22000 79800
DULHASTI HPS NHPC LTD HYDRO-HYDRO 39000 228000 56400
SALAL HPS NHPC LTD HYDRO-HYDRO 69000 342300 11000
TANAKPUR HPS NHPC LTD HYDRO-HYDRO 9420 43000 29600
URI HPS -I NHPC LTD HYDRO-HYDRO 48000 280300 16000
URI HPS - II NHPC LTD HYDRO-HYDRO 24000 147300 48600
NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 4500 24600 88200
SEWA - II NHPC LTD HYDRO-HYDRO 12000 47100 43400
ANTA CCPP NTPC LTD THERMAL-GASN 41930 67539 32400
AURAIYA CCPP NTPC LTD THERMAL-GASN 66336 53501 39100
BADARPUR TPS NTPC LTD THERMAL-COAL 70500 159153 44800
DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 84000 296170 42300
DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 98000 526686 46300
DADRI CCPP NTPC LTD THERMAL-GASHSD 82978 227469 33000
FARIDABAD CCPP NTPC LTD THERMAL-GASN 43159 115577 30800
RIHAND STPS I NTPC LTD THERMAL-COAL 100000 596766 24500
RIHAND STPS II NTPC LTD THERMAL-COAL 100000 737069 24600
RIHAND STPS III NTPC LTD THERMAL-COAL 100000 706546 30600
SINGRAULI STPS NTPC LTD THERMAL-COAL 200000 1394068 20400
TANDA TPS NTPC LTD THERMAL-COAL 44000 295438 40800
UNCHAHAR TPS I NTPC LTD THERMAL-COAL 42000 256454 39800
UNCHAHAR TPS II NTPC LTD THERMAL-COAL 42000 273577 38900
UNCHAHAR TPS III NTPC LTD THERMAL-COAL 21000 142780 43000
KOLDAM NTPC LTD HYDRO-HYDRO 80000 363260 43600
NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 303575 25841
RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 108000 668677 35374
NJHPS SJVNL HYDRO-HYDRO 150000 699496 23820
RAMPUR HPS SJVNL HYDRO-HYDRO 41202 195982 32260
TEHRI HPP THDC HYDRO-HYDRO 100000 272543 51800
KOTESHWAR HEP THDC HYDRO-HYDRO 40000 106244 53400
IGSTPS JHAJJAR ARAVALI P CPL THERMAL-COAL 150000 510429 49490
NEYVELI BARSINGSAR NEYVELI LIG CORP LTD THERMAL-LIG 25000 127520 38040
STATE SECTOR
PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 21000 14222 48200
PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 21000 19205 48400
PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 25000 102257 42600
PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 25000 62107 41800
DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 60000 312213 41000
RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 120000 35767442200
WYC HYDEL STATION HPGCL HYDRO-HYDRO 6240 20365 24900
GIRI POWER HOUSE HPSEB HYDRO-HYDRO 6000 13958 7600
ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 1695 5467 11900
BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 12000 18528 6700
GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 2250 7462 22500
BASSI POWER HOUSE HPSEB HYDRO-HYDRO 6600 29649 7500
BINWA POWER HOUSE HPSEB HYDRO-HYDRO 600 2749 19300
ANNEXURE-I
RATE OF SALE OF POWER FOR THE YEAR 2016-2017
Page 33
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) GAJ POWER HOUSE HPSEB HYDRO-HYDRO 1050 2914 26700
BANER POWER HOUSE HPSEB HYDRO-HYDRO 1200 2864 16200
HOLI POWER HOUSE HPSEB HYDRO-HYDRO 300 616 22500
THIROT POWER HOUSE HPSEB HYDRO-HYDRO 450 1126 22500
KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 1200 3064 22500
LARJI POWER HOUSE HPSEB HYDRO-HYDRO 12600 53677 23700
NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 250 750 31000
CHABA POWER HOUSE HPSEB HYDRO-HYDRO 175 465 23300
RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 150 101 13400
SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 200 000 22500
KILLAR HPSEB HYDRO-HYDRO 030 050 22500
BHABA AUGUMENP H HPSEB HYDRO-HYDRO 450 1276 22500
BS CHAMBA HPSEB HYDRO-HYDRO 045 099 19500
GUMMA HPSEB HYDRO-HYDRO 300 423 22500
GAS TURBINE POWER STATION IPGCL THERMAL-GAS 27000 67233 39300
PPS-I PPCL THERMAL-GAS 33000 175905 38300
PPS-III PPCL THERMAL-GAS 137120 196879 36100
LOWER JHELUM JampKPDD HYDRO-HYDRO 10500 60214 5100
UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 2260 10514 6300
UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 10500 44202 8500
GANDHARBAL JampKPDD HYDRO-HYDRO 1500 8925 4700
KARNAH MPH JampKPDD HYDRO-HYDRO 200 1122 31000
CHENANI I JampKPDD HYDRO-HYDRO 2330 10892 6600
CHENANI II JampKPDD HYDRO-HYDRO 200 1188 9300
CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 750 3634 14200
IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 375 2108 18500
IGO MERCHELLONG JampKPDD HYDRO-HYDRO 300 1572 29700
PAHALGAM MHP JampKPDD HYDRO-HYDRO 450 1713 32900
MARPACHOO JampKPDD HYDRO-HYDRO 075 375 29800
HAFTAL JampKPDD HYDRO-HYDRO 100 483 28700
SANJAK JampKPDD HYDRO-HYDRO 126 441 36000
SEWA-III JampKPDD HYDRO-HYDRO 900 3273 20200
BHADERWAH JampKPDD HYDRO-HYDRO 150 935 8900
BAZGO JampKPDD HYDRO-HYDRO 030 108 33300
SUMOOR JampKPDD HYDRO-HYDRO 010 045 35400
HUNDER JampKPDD HYDRO-HYDRO 040 176 26200
STAKNA JampKPDD HYDRO-HYDRO 400 1933 4100
KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 124000 662879 31360
SURATGARH TPS RRVUNL THERMAL-COAL 150000 402328 41730
CHHABRA TPS 1amp 2 RRVUNL THERMAL-COAL 50000 305946 36700
CHHABRA TPS 3 RRVUNL THERMAL-COAL 25000 151536 36700
CHHABRA TPS 4 RRVUNL THERMAL-COAL 25000 155896 36700
RAMGARH GT POWER PROJECT RRVUNL THERMAL-COAL 22050 43177 41800
RAMGARH GAS T P PROJECT 3 RRVUNL THERMAL-GAS 5000 93615 41800
DHOLPUR C C POWER PROJECT RRVUNL THERMAL-R-LNG 33000 9486 46110
MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 14000 20855 34192
MINI MICRO HYDEL (MMH) P S RRVUNL HYDRO-HYDRO 2385 851 37800
KALISINDH TPP 1 RRVUNL THERMAL-COAL 60000 341543 45000
KALISINDH TPP 2 RRVUNL THERMAL-COAL 60000 211588 45000
KHARA HEP UPJVNL HYDRO-HYDRO 7200 26654 7200
MATATILLA HEP UPJVNL HYDRO-HYDRO 3060 12219 6500
OBRA HEP UPJVNL HYDRO-HYDRO 9900 21517 6300
RIHAND UPJVNL HYDRO-HYDRO 30000 57369 5500
ANPARA A TPS UPRVUNL THERMAL-COAL 63000 317536 27000
ANPARA B TPS UPRVUNL THERMAL-COAL 100000 705605 22700
ANPARA D UPRVUNL THERMAL-COAL 100000 300158 39800
HARDUAGANJ TPS UPRVUNL THERMAL-COAL 16500 45817 49200
HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 50000 304389 46600
OBRA A TPS UPRVUNL THERMAL-COAL 28800 13158 34000
OBRA B TPS UPRVUNL THERMAL-COAL 100000 328124 21900
Page 34
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) PANKI TPS UPRVUNL THERMAL-COAL 21000 66488 50300
PARICHHA TPS UPRVUNL THERMAL-COAL 22000 38762 49400
PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 42000 231931 45600
PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 50000 276722 50400
CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 24000 70845 8290
CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 14400 75366 8390
DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 3375 9595 12080
DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 5100 18701 10520
KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4140 17359 12330
KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 12000 33001 9420
KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 3000 11953 8320
TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 9000 33983 12460
MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 30400 124510 16110
RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 19800 17897 10550
MPUR UTTARAKHAND JVNL HYDRO-HYDRO 930 5121 19200
PATHRI UTTARAKHAND JVNL HYDRO-HYDRO 2040 11636 14200
GALOGI UTTARAKHAND JVNL HYDRO-HYDRO 300 648 12500
PRIVATE SECTOR
MGTPP CLP INDIA PVT LTD THERMAL-COAL 132000 268902 41940
SHRINAGAR HEP ALAKNANDA HPCL HYDRO-HYDRO 33000 127414 48800
GAMA INFRAPROP CCPP GAMA INFRAPROP PVT THERMAL-GAS 22500 52686 47000
PPGCL (BARA) JP POWER VENTURES LTD THERMAL-COAL 198000 448200 38500
MALANA HEP MALANA PCL HYDRO-HYDRO 8600 26354 29792
MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 10000 30369 32580
ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 19200 56347 36079
KASHANG HEP H P PCL HYDRO-HYDRO 19500 5034 29200
BASPA-II HEP HBPCL HYDRO-HYDRO 30000 132769 13600
KARCHAM WANGTOO HEP HBPCL HYDRO-HYDRO 100000 434386 36600
RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 108000 582600 43700
RITHALA COMBI CY POWER PLANT TATA POWER DDL THERMAL-GAS 9480 000 11900
RAJPURA TPS NABHA POWER LTD THERMAL-GAS 140000 901484 39000
TALWANDI SABO POWER LTD TALWANDI SABO POWER LTD THERMAL-COAL 198000 636040 49548
ROJA THERMAL POWER STATION ROJA POWER SCL THERMAL-COAL 120000 727200 43400
KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 34400 63400
BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 36000 62600
MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 38200 60800
UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 37900 61500
KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 42300 58800
LALITPUR PGCL BAJAJ ENERGY PVT LTD THERMAL-COAL 198000 359400 47300
PRAYAGRAJ PGCL PRAYAGRAJ PGCL THERMAL-COAL 132000 448200 38595
KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 132000 783182 33438
WESTERN REGION
CENTRAL SECTOR
INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 100000 325333 23892
OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 52000 141663 34001
GANDHAR CCPP NTPC LTD THERMAL-GAS 65739 221924 28700
KAWAS CCPP NTPC LTD THERMAL-GASN 65620 167929 27000
KORBA I amp II NTPC LTD THERMAL-COAL 210000 1499171 20500
KORBA III NTPC LTD THERMAL-COAL 50000 358746 26600
SIPAT STPS I NTPC LTD THERMAL-COAL 198000 1479902 26800
SIPAT STPS II NTPC LTD THERMAL-COAL 100000 766549 26500
VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 126000 693142 25800
VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 100000 608781 23800
VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 100000 673475 27600
VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 100000 655924 32900
VINDHYACHAL STPS V NTPC LTD THERMAL-COAL 50000 328265 31700
MOUDA I NTPC LTD THERMAL-COAL 100000 343130 44500
MOUDA Ii NTPC LTD THERMAL-COAL 66000 40637 39900
RATNAGIRI GAS amp POWER PVT LTD RGPPL THERMAL-GAS 196708 442485 47000
KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 000 24729
TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 32000 201227 10740
Page 35
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 365122 19069
TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 787444 29324
STATE SECTOR
GSEG-HAZIRA15610 MW GUJARAT S ENEGEN LTD THERMAL-GAS 15610 1805 28200
GSEG-HAZIRA35143 MW GUJARAT S ENEGEN LTD THERMAL-GAS 35130 22276 51300
GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 21978 51800
AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 13929 26100
KORBA TPS EAST CSPGCL THERMAL-COAL 44000 198673 33880
DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 365808 27570
KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 316500 30420
HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 532878 19410
CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 515 58300
MTTPS CHAMPA U-I CSPGCL THERMAL-COAL 50000 220376 39000
MTTPS CHAMPA U-II CSPGCL THERMAL-COAL 50000 23709 10000
SHP GANGREL CSPGCL HYDRO-HYDRO 1000 2350 36790
BANGO HEP CSPGCL HYDRO-HYDRO 12000 14662 8900
MHP KORBA WEST CSPGCL HYDRO-HYDRO 170 859 38190
SIKASAR HEP CSPGCL HYDRO-HYDRO 700 418 26870
DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8843 74500
DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 19446 51500
GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 66388 71600
GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127488 41300
KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 96072 43900
KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 29841 56400
SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 184966 58800
UKAI 1-5 GSECL THERMAL-COAL 85000 204891 46900
UKAI TPS 6 GSECL THERMAL-COAL 50000 284448 48200
WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 271999 58300
WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 82808 44100
KADANA HPS GSECL HYDRO-HYDRO 24200 34433 16800
UKAI HPS GSECL HYDRO-HYDRO 30500 40585 6100
TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 123000 11500
BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 8900 10900
BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 7200 27500
JHINNA HPS MPPGCL HYDRO-HYDRO 2000 9700 18500
RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 44300 3400
GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 17300 4600
SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 4100 16900
MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 14600 27000
PENCH HPS MPPGCL HYDRO-HYDRO 16000 23700 8100
RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 3000 16900
AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 134400 35100
SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 283800 38700
SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 344600 34300
SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 111600 61600
SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 211800 58000
SSTPS PH-I MPPGCL THERMAL-COAL 120000 233100 84300
BHUSAWAL TPS MSPGCL THERMAL-COAL 142000 566258 51100
CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1365682 33700
KHAPERKHEDA MSPGCL THERMAL-COAL 134000 706207 39100
KORADI TPS MSPGCL THERMAL-COAL 62000 443206 42000
NASIK TPS MSPGCL THERMAL-COAL 63000 297275 47000
PARLI TPS MSPGCL THERMAL-COAL 113000 175934 71600
PARAS MSPGCL THERMAL-COAL 50000 267931 38700
URAN CCPP MSPGCL THERMAL-GAS 67200 320330 30600
KOYANA MSPGCL HYDRO-HYDRO 195600 328155 13100
SMALL HYDRO POWER PLANTS MSPGCL HYDRO-HYDRO 45400 93062 30500
BHIRA MSPGCL HYDRO-HYDRO 8000 10046 8400
TILLARI MSPGCL HYDRO-HYDRO 8900 10584 3100
SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 233298 20500
SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 87633 20500
PRIVATE SECTOR
Page 36
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 81282 46750
JNSTPP(JAYPEE NIGRIE) JP POWER VENTURES LTD THERMAL-COAL 132000 726695 29310
MB POWER MB POWER THERMAL-COAL 120000 345632 38310
ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 754922 28671
ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 780761 23495
ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 198000 1263784 32090
ADANI POWER MAHARA ADANI POWER LTD THERMAL-COAL 330000 1666191 34124
AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 170065 36827
SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 252035 45129
ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 458551 36000
ESSAR POWER MP LTD ESSAR POWER MP LTD THERMAL-COAL 60000 243040 28600
VEDANTA LTD (P P -I) VEDANTA LTD THERMAL-GAS 3000 15044 24000
VEDANTA LTD (P P -II) VEDANTA LTD THERMAL-GAS 3000 21293 24000
PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 8234600 24000
165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 5850 64390
145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 68717 40349
SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 132655 28776
SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 144686 38567
MUNDRA UMPPCOASTAL GUJARAT POWER
LTD THERMAL-IMP COAL 400000 2530300
23900
LANCO AMARKANTAK TPP PATHADIH
U-ILANCO AMARKAN POWER LTD THERMAL-COAL 30000 195500
29200
LANCO AMARKANTAK TPP PATHADIH
U-IILANCO AMARKAN POWER LTD THERMAL-COAL 30000 206900
27600
BARADARHA TPS D B POWER LTD THERMAL-COAL 120000 677373 29200
JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 405000 28900
JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 453000 40500
DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 339437 40700
TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 293400 44000
TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 137200 37000
TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 174900 44000
BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 92900 14100
BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23700 34300
KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 27600 48300
CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2530300 23900
BHANDARDRA HEP -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 2475 54900
SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 161400 26500
SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 445000 39000
SOTHERN REGION
CENTRAL SECTOR
NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 325699 54820
NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 305532 39880
NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 998805 38510
NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 113016 54070
NEYVELI TAMILNADU POWER LTD JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 625274 42200
VALLUR TPS NTPC TECL THERMAL-COAL 150000 856438 42350
R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 1493 84300
RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1502919 29400
RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 341291 31800
SIMHADRI I NTPC LTD THERMAL-COAL 100000 688382 36800
SIMHADRI II NTPC LTD THERMAL-COAL 100000 663657 43400
KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 593110 31324
MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 291625 21764
KKNPP-1 amp 2 NPCIL NUCLEAR-NUCLEAR 200000 572609 40948
MINICOY LAKSHADEEP THERMAL-DIESEL 340 770 29600
KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1097 29600
AMINI LAKSHADEEP THERMAL-DIESEL 265 509 29600
ANDROTT LAKSHADEEP THERMAL-DIESEL 219 524 29600
KALPENI LAKSHADEEP THERMAL-DIESEL 175 356 29600
AGATTI LAKSHADEEP THERMAL-DIESEL 195 658 29600
KADMAT LAKSHADEEP THERMAL-DIESEL 190 414 29600
KILTAN LAKSHADEEP THERMAL-DIESEL 150 269 29600
CHETLET LAKSHADEEP THERMAL-DIESEL 100 139 29600
BITRA LAKSHADEEP THERMAL-DIESEL 043 024 29600
BANGARAM LAKSHADEEP THERMAL-DIESEL 018 009 29600
Page 37
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) STATE SECTOR
Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 721811 46500
Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 50000 336142 46500
RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 237358 46500
RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 239926 46500
RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 124500 46500
SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 62109 46500
UPPER SILERU APGENCO HYDRO-HYDRO 24000 33000 46500
LOWER SILERU APGENCO HYDRO-HYDRO 46000 81066 46500
DONKARAI APGENCO HYDRO-HYDRO 2500 6007 46500
PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 1262 46500
CHETTIPETA APGENCO HYDRO-HYDRO 100 214 46500
MUCHKUND APGENCO HYDRO-HYDRO 12000 37571 46500
NAGARJUNASAGAR RCPH APGENCO HYDRO-HYDRO 9000 606 46500
TUNGABHADRA HES amp HAMPI(AP
Share)
APGENCO HYDRO-HYDRO 7200 6100 46500
KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 352232 42600
KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 288131 32500
KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 319272 46500
RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 40073 44300
KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 308317 46000
KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 308963 51300
SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 61004 76600
NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 17960 75300
PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 20873 58300
POCHAMPAD-I TSPGENCO HYDRO-HYDRO 2700 5455 29800
POCHAMPAD-II TSPGENCO HYDRO-HYDRO 900 1932 40700
NIZAMSAGAR TSPGENCO HYDRO-HYDRO 1000 1126 53400
RAICHUR TPS 1 to 7 KPCL THERMAL-COAL 147000 890866 43800
RAICHUR TPS 8 KPCL THERMAL-COAL 25000 159523 48200
BELLARI TPS 1 KPCL THERMAL-COAL 50000 318679 51100
BELLARI TPS 2 KPCL THERMAL-COAL 50000 232347 55600
BELLARI TPS 3 KPCL THERMAL-COAL 70000 47565 34400
BHADRA PH KPCL HYDRO-HYDRO 3920 2369 45900
GERUSUPPA PH KPCL HYDRO-HYDRO 24000 26990 22000
GHAT PRABHA HEP KPCL HYDRO-HYDRO 3200 4777 25300
KADRA HPS KPCL HYDRO-HYDRO 15000 16889 26800
NAGJHARI KPCL HYDRO-HYDRO 90000 155159 9800
KODASALLI DPH KPCL HYDRO-HYDRO 12000 14854 19200
MUNIRA+MGH+SPH+SPH KPCL HYDRO-HYDRO 22640 48211 7900
SHARAVATHY HPS KPCL HYDRO-HYDRO 108550 276215 5400
ALMATTI DPH KPCL HYDRO-HYDRO 29000 39611 24600
VARAHI UGPH KPCL HYDRO-HYDRO 46000 71368 15600
IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 17196 15300
IDUKKI HPS KSEB HYDRO-HYDRO 78000 137905 15300
KAKKAD HPS KSEB HYDRO-HYDRO 5000 13063 15300
KALLADA HPS KSEB HYDRO-HYDRO 1500 4436 15300
KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 46544 15300
KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 635 15300
LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 30822 15300
MALANKARA HPS KSEB HYDRO-HYDRO 1050 2474 15300
MATTUPETTY KSEB HYDRO-HYDRO 200 230 15300
MALAMPUZHA KSEB HYDRO-HYDRO 250 063 15300
CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 864 15300
URUMI ST I amp II KSEB HYDRO-HYDRO 615 903 15300
LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 248 15300
NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7765 19625 15300
PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 16601 15300
PANNIAR HPS KSEB HYDRO-HYDRO 3240 6217 15300
PORINGALKUTHU KSEB HYDRO-HYDRO 3600 10052 15300
PORINGALKUTHU LBE KSEB HYDRO-HYDRO 1600 9438 15300
PEPPARA KSEB HYDRO-HYDRO 300 395 15300
POOZHITHODE KSEB HYDRO-HYDRO 480 1045 15300
Page 38
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) PEECHI KSEB HYDRO-HYDRO 125 040 15300
RANI-PERUNADU KSEB HYDRO-HYDRO 400 585 15300
SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 79783 15300
SENGULAM HPS KSEB HYDRO-HYDRO 5120 11558 15300
SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 16711 15300
VILANGAD KSEB HYDRO-HYDRO 750 1578 15300
BARAPOLE KSEB HYDRO-HYDRO 1500 1932 15300
VELLATHOOVAL KSEB HYDRO-HYDRO 360 305 15300
CHIM0NY KSEB HYDRO-HYDRO 250 156 15300
ADYANPARA KSEB HYDRO-HYDRO 350 501 15300
BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 554 15300
KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 3801 15300
KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 23132 32800
ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 14416 62280
METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 523970 62280
METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 321270 62280
NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 336575 62280
NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 591240 62280
TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 508966 62280
KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 30897 62280
VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 18720 90699 62280
KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 33593 62280
BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 1047 62280
PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 1250 62280
PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 330 62280
MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 4897 62280
MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 032 62280
KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15681 62280
KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 40608 62280
KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 21342 62280
KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 4717 62280
KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4322 62280
KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2399 62280
METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 4416 62280
METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 8035 62280
BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2187 62280
BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2359 62280
BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2511 62280
BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 1949 62280
BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 1819 62280
POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 172 62280
SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 241 62280
MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 026 62280
THIRUMOORTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 136 62280
PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 9309 62280
VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 353 62280
SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 4192 62280
PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 6571 62280
SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 1186 62280
SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6319 62280
ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 6122 62280
KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 28674 62280
SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 18381 62280
SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 4258 62280
KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 12680 62280
KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4201 62280
ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 000 62280
PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 19175 62280
AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 078 62280
BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 504 62280
BHAVANI KATTALAI (BKB)(IIIampIII BB I amp II)TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 5847 62280
PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 000 62280
Page 39
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) SRI DAMODARAM STPS APPDCL THERMAL-COAL 160000 808108 36300
PRIVATE SECTOR
KARUPPUR TANJORE LANCO TANJORE PCL THERMAL-GAS 12000 48096 28770
SIMHAPURI ENERGY LTD SIMHAPURI ENERGY LTD THERMAL-COAL 60000 143900 39100
JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 7111 45500
SBU 1 JSW ENERGY LTD
VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 26000 159100
43300
SBU 2 JSW ENERGY LTD
VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 60000 247900
42800
LANCO KPLLANCO KONDAPALLI POWER
LTDTHERMAL-GAS 36814 85060
25776
LANCO KPL STG -IILANCO KONDAPALLI POWER
LTDTHERMAL-GAS 36600 12979
46330
LANCO KPL STG -IIIALANCO KONDAPALLI POWER
LTDTHERMAL-GAS 37100 85710
46330
LANCO KPL STG -III BLANCO KONDAPALLI POWER
LTDTHERMAL-GAS 37100 43639
46330
HINDUJA NATIONAL PCL HINDUJA NATIONAL PCL THERMAL-COAL 104000 303000 38200
MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 121164 49940
UDUPI POWER COR LTD ADANI POWER LTD THERMAL-COAL 120000 754613 42500
SPECTRUM POWER GENERATION
LTD SPECTRUM PG LTD THERMAL-GASN 20525 9256812
34952
TAQA NEYVELI POWER COM PVT
LTD TAQA NEYVELI THERMAL-LIG 25000 5840
34500
ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 251000 51000
ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 207860 36800
GMR VEMAGIRI POWER GENERATION
LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 30117
46450
EASTERN REGION
CENTRAL SECTOR
MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 64675 53113
MTPS STAGE - II KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 39000 1432 69138
BOKARO `B` TPS DVC THERMAL-COAL 63000 145670 31539
MEJIA TPS U 1-3 DVC THERMAL-COAL 63000 348298 31552
MEJIA TPS U 4 DVC THERMAL-COAL 21000 116099 34997
MEJIA TPS U 5-6 DVC THERMAL-COAL 50000 276427 35976
MEJIA TPS U 7-8 DVC THERMAL-COAL 100000 552854 36991
DURGAPUR STEEL TPS DVC THERMAL-COAL 100000 665550 39323
DURGAPUR TPS DVC THERMAL-COAL 21000 59270 35416
RAGHUNATHPUR TPS DVC THERMAL-COAL 120000 201650 35326
MAITHON HYDEL STA DVC HYDRO-HYDRO 6320 12200 17984
CHANDRAPURA TPSU1-3 DVC THERMAL-COAL 42000 257610 35095
CHANDRAPURA TPSU7-8 DVC THERMAL-COAL 50000 306673 34987
KODERMA TPS DVC THERMAL-COAL 100000 380180 38131
PANCHET HPS DVC HYDRO-HYDRO 8000 13360 17984
TILLAYA HPS DVC HYDRO-HYDRO 400 1410 17984
RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34700 35400
TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 277300 23200
TLDP -III NHPC LTD HYDRO-HYDRO 13200 55400 62000
TLDP -IV NHPC LTD HYDRO-HYDRO 16000 60300 25600
FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 957219 33700
FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 308943 41000
BONGAINGAON TPS NTPC LTD THERMAL-COAL 25000 153663 58600
KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 542277 34200
KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 942591 34200
BARH-II NTPC LTD THERMAL-COAL 132000 728021 44500
TALCHER TPS NTPC LTD THERMAL-COAL 46000 335521 30100
TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 702319 25600
TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1436521 24700
STATE SECTOR
BTPS(RampM) BIHAR STATE PGCL THERMAL-COAL 22000 12142 39700
BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 98331 10602
HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 50593 9482
CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 19689 2605
RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 53192 6033
UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 147208 14637
Page 40
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 60353 4519
IB TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 288567 25000
J P H GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 210 038 61100
MEYONG CHU GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 400 1086 61100
TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 122667 38200
DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 214339 43321
KOLAGHAT THERMAL POWER
STATION
WEST BENGAL PDCL THERMAL-COAL 126000 538269 31603
BAKRESHWAR THERMAL POWER
PLANT
WEST BENGAL PDCL THERMAL-COAL 105000 634876 32154
BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 45000 166855 33299
SANTHALDIH THERMAL POWER
STATION
WEST BENGAL PDCL THERMAL-COAL 50000 336442 34932
SAGARDIGHI THERMAL POWER
PROJECT
WEST BENGAL PDCL THERMAL-COAL 160000 423121 34705
JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 20344 68900
RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 24559 68900
TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 4623 68900
PURULIA PUMPED STORAGE
PROJECT
WEST BENGAL SEDCL HYDRO-HYDRO 90000 108816 68900
MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2768 68900
PRIVATE SECTOR
CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 49474 20230
CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 555500 70200
HALDIA ENERGY HALDIA ENERGY LTD THERMAL-COAL 60000 371000 50400
DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3688 63400
KAMALANGA TPS GMR KAMALANGA ENERGY LTD THERMAL-COAL 105000547670
33300
ADHUNIK POWER U-1 ADHUNIK POWER THERMAL-COAL 27000 158 44060
ADHUNIK POWER U-2 ADHUNIK POWER THERMAL-COAL 27000 168 44250
VL-JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 332800 23622
JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 43000 45250
JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 71700 37030
JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 70700 35920
JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 71100 38870
JOJOBERA UNIT 5 TATA POWER COM LTD THERMAL-COAL 12000 79300 44560
JOJOBERA UNIT 6 TATA POWER COM LTD THERMAL-WHR 12000 83700 12840
IEL KALINGANAGAR U-I TATA POWER COM LTD THERMAL-WG 6750 33400 22500
IEL KALINGANAGAR U-II TATA POWER COM LTD THERMAL-WG 6750 34800 22500
MAITHON UNIT 1 amp 2 TATA POWER COM LTD THERMAL-COAL 105000 678000 36100
HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 27500 24340
HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 28400 24340
HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 15800 24310
NORTH EASTERN REGION
CENTRAL SECTOR
LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 74100 36600
AGARTALA GT NEEPCO THERMAL-GAS 13500 88611 27210
ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 153111 32310
DOYANG HEP NEEPCO HYDRO-HYDRO 7500 25598 49801
KOPILI HEP NEEPCO HYDRO-HYDRO 20000 98186 11491
KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 19582 20237
KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 10310 17968
RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 124093 22945
TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 10100 17344 39000
STATE SECTOR
HYDRO POWER (122 Stns) ITANAGAR GOVT OF ARUNACHAL
PRADESHHYDRO-HYDRO 6971 6217270
24600
KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39514 17337
LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 82327 36810
NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 33318 48290
MYNTRIANG SHEP ST II ASSAM POWER GENCO HYDRO-HYDRO 300 567 35776
LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 9130 49200
LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 012 49200
DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 022 49200
TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 000 49200
UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 4990 16000
UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 6476 37000
UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 16494 14600
UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 3600 9556 15000
SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 758 8000
MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44070 44800
KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 154 41400
TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 091 41400
MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 411 41400
MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 394 41400
KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 760 41400
SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 3264 41400
LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 044 41400
BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 18953 28000
ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 43585 28200
GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 4080 11100
Note
LIG Lignite N Naptha WHR Waste Heat Recovery
Page 41
1
2
3
Nuclear Hydro RES Grand TotalRegion Coal Lignite Gas Diesel Total
Northern 5036020 158000 578126 000 5772146 162000 1970777 1419902 9324825
Western 7280862 154000 1080649 000 8515511 184000 754750 2307894 11762155
Southern 4304202 314000 647366 56158 5321726 332000 1177483 3862018 10693227
Eastern 2746364 000 10000 000 2756364 000 494212 140148 3390724
North-East 77002 000 177581 3600 258183 000 142700 32429 433311
Islands 000 000 000 4005 4005 000 000 1773 5778
ALL INDIA 19444450 626000 2493722 63763 22627934 678000 4539922 7764163 35610019
Note Captive Genaration is not included in the total Captive Power capacity as on 31032017 RES as on 31032019 3
Thermal
Nuclear
3 List of Projects Commissioned During Apr-2019
4 All India Installed Capacity (MW) Region-wise as on 30-04-19
NIL
NIL
Thermal
NIL
Hydro
22627934
678000
4539922
7764163
35610019
51529
000
5000000
10000000
15000000
20000000
25000000
30000000
35000000
40000000
Thermal Nuclear Hydro RES Total Captive
Thermal Nuclear Hydro RES Total Captive
Total = 356100189
Sector
Coal Lignite Gas Diesel Total
State 6407650 129000 711871 36393 7284913 000 2987880 234793 10507586
Private 7468800 183000 1058060 27370 8737230 000 339400 7366140 16442770
Central 5568000 314000 723791 000 6605791 678000 1212642 163230 8659663
All India 19444450 626000 2493722 63763 22627934 678000 4539922 7764163 35610019
State 10507586
Private 16442770
Central 8659663
Electricity Generation (MU) Targets and Achievements for 2016-17
5 All India Installed Capacity (MW) Sector-wise as on 30-04-19
4
Grand TotalTHERMAL
Nuclear Hydro RES
RES as on 31032019
State 10507586 30
Private 16442770 46
Central 8659663 24
All India Installed Capacity(MW) (Sector-Wise)
Voltage Level
+- 500 KV HVDC
+- 800 KV HVDC
765 KV
400 KV
220 KV
All India
Voltage Level
+- 500 KV HVDC
+- 800 KV HVDC
765 KV
400 kV
220 KV
All India
5
481 401
763 474
0 0
242 53
40 20
0 0
242 53
40 20
481 401
763 474
Transmission Lines Added duringApr-18 to Apr-18 ampApr-19 to Apr-19 (Ckms)
Apr-18 to Apr-18 Apr-19 to Apr-19
0 0
6 Transmission Lines Added during Apr-2019 (Ckms)
Apr-18 Apr-19
0 0
763
474
0
100
200
300
400
500
600
700
800
900
All India
Ckm
s
Apr-18 Apr-19
763
474
0
100
200
300
400
500
600
700
800
900
All India
Ckm
s
Apr-18 to Apr-18 Apr-19 to Apr-19
Voltage Level
+- 800 KV HVDC
+- 500 KV HVDC
765 KV
400 KV
220 KV
All India
Voltage Level
+- 800 KV HVDC
+- 500 KV HVDC
765 KV
400 KV
220 KV
All India
6
0 0
All India Transformation Capacity Addition during Apr-18 to Apr-18 amp Apr-19
to Apr-19 (MVA)
4600
0
500
2795
1305
5470
4000
185
1285
0
Apr-18 to Apr-18 Apr-19 to Apr-19
5470
0
500
4600
2795
1305
7 Transformation Capacity Addition During Apr-2019 (MVA)
0
4000
185
1285
0 0
Apr-18 Apr-19
5470
4600
4000
4200
4400
4600
4800
5000
5200
5400
5600
MV
A
Apr-18 Apr-19
5470 4600
0
74520
1
MV
A
Apr-18 to Apr-18 Apr-19 to Apr-19
Apr-2018 Apr-2019 Apr-2018 Apr-2019 Apr-2018 Apr-2019
Northern 28590 30094 28170 29786 -15 -10
Western 33235 34875 33233 34868 00 00
Southern 29211 31111 29166 31109 -02 00
Eastern 11752 12851 11650 12850 -09 00
North Eastern 1225 1300 1174 1228 -42 -55
All India 104013 110231 103393 109842 -06 -04
Apr-2018 Apr-2019 Apr-2018 Apr-2019 Apr-2018 Apr-2019
Northern 48824 54476 48367 53985 -09 -09
Western 50654 56242 50434 56222 -04 00
Southern 45946 49155 45684 49103 -06 -01
Eastern 21320 23349 21275 23349 -02 00
North Eastern 2600 2848 2552 2780 -18 -24
All India 162492 177411 161286 176810 -07 -03
Apr-2019 Figures are Provisional
7
8 Power Supply Position (Energy amp Peak) in Apr-2019
Peak Demand Peak Met
Requirement Availability
Energy (MU)Region
Surplus(+)
Deficit (-) in
Surplus(+)
Deficit (-) in Region
Power (MW)
Chandigarh Delhi Haryana HP JampK Punjab Rajasthan UP Utrakhand Apr-2018 0 0 0 0 546 0 0 247 0
Apr-2019 0 0 0 0 565 0 0 0 0
Chattisgarh Gujarat MP Maharashtra Daman amp Diu Dadar Nagar Goa
Apr-2018 13 11 3 99 0 0 0
Apr-2019 22 6 0 8 1 0 0
AP Telangana Karnataka Kerala Tamil Nadu Puducherry Lakshadweep
Apr-2018 22 0 2 0 0 20 0
Apr-2019 0 0 0 8 0 2 0
8
9 Peak Shortage of Power Supply (MW) in Different Regions in Apr-2019
0 0 0 0
565
0 0 0 00 0 0 0
546
0 0
247
0
0
400
800
Ch
an
dig
ar
h Delh
i
Ha
rya
na
HP
Jamp
K
Pu
nja
b
Ra
jasth
an
UP
Utr
akhan
d
MW
Northern States (MW) Apr-2019 Apr-2018
22
6 0 8 1 0 0
13
11
3
99
0 0 0
0
50
100
150
Ch
attis
gar
h
Guja
rat
MP
Mah
ara
shtr
a
Da
man amp
Diu
Da
dar
Na
gar G
oa
MW
Western States (MW) Apr-2019 Apr-2018
0 0 08
0 2 0
22
0 2 0 0
20
00
50
AP Telangana Karnataka Kerala Tamil Nadu Puducherry Lakshadweep
Southern State (MW) Apr-2019 Apr-2018
Bihar DVC Jharkhand Odisha West Bengal Sikkim AampN Island
Apr-2018 0 39 0 0 7 0 4
Apr-2019 0 0 0 0 0 0 4
Arunachal Assam Manipur Meghalaya Mizoram Nagaland Tripura
Apr-2018 5 30 7 0 9 29 4
Apr-2019 3 45 9 0 3 26 1
9
0 0 0 0 0 0
4
0
39
0 0
7
0
4
01020304050
Bih
ar
DV
C
Jha
rkh
an
d
Od
ish
a
We
st
Be
ng
al
Sik
kim
Aamp
NIs
land
MW
Eastern States (MW) Apr-2019 Apr-2018
3
45
9
0 3
26
1
5 7
0
9
29
4
0
10
20
30
40
50
Aru
na
cha
l
Assa
m
Ma
nip
ur
Me
gh
ala
ya
Miz
ora
m
Na
gala
nd
Trip
ura
MW
North-Eastern States (MW)
Sector Apr-2018 Apr-2019
Central 7634 7459
State 6438 6142
Private Sector IPP 5525 6005
Private Sector UTL 6815 6440
ALL INDIA 6454 6471
Month PLF 2018 PLF 2019
Jan 6215 6054
Feb 6230 6051
March 6452 6340
April 6454 6471
For Coal and Lignite based Power Plants and Provisional based on Actual-Cum-Assesment
10
PLF of Thermal Power Plants
(excluding gas based power plants)
All India PLF of Thermal Plants (Excluding Gas Based Plants) Month-wise
10 All India Thermal PLF Sector-wise (Excluding Gas Based Power Plants) for Apr-2019
5800
6000
6200
6400
6600
Jan Feb March April
Months
All India PLF Month-wise
PLF 2018 PLF 2019
7634
64385525
6815 6454
7459
6142 60056440 6471
000
2000
4000
6000
8000
10000
Central State Private Sector IPP Private Sector UTL ALL INDIA
All India Thermal PLF
Apr-2018 Apr-2019
2012-13 2013-14 2014-15 2015-16 2016-17 2017-18
TampD Losses 2304 2284 2277 2181 2142 2104
ATampC Losses 2548 2262 2572 2398 NA NA
Provisional
Note As per PFC for utilities selling directly to consumers NA- Not Available
Total Number of Villages
597464
Note From the year 2004-05 onwards Definition of Village Electrification-
A village would be declared Electrified if
Without
Subsidy
Gap ACS-
ARR(
Without
Subsidy)
Paiseunit
Gap ACS-
ARR (on
subsidy
booked
basis)
paiseunit
Gap ACS-
ARR (on
subsidyrece
ived basis)
paiseunit
2013-14 400 118 76 77
2014-15 412 108 58 60
Source- PFC Reports on the performance of State Power Utilities
2013-14 4894
2014-15 5304
2015-16 5459
2016-17 5743
2017-18 6080
2018-19 6289
11
11 T amp D and ATampC Losses ()
12 All India Village Electrification
Villiages Electrified (Nos)
10000All villages as per census 2011 has
been electrified on 28042018
Villages electrified
Average cost of supply(ACS)
(paiseunit)
i) Basic Infrastructure such as Distribution Transformer and Distribution lines are provided in the inhabited locality
as well as Dalit Basti hemlet where it exists (For electrification through Non-Conventional Energy Sources a
Distribution Transformer may not be necessary)
14 All India Coal consumption for Power Generation (MT)
520
Average Revenue Realization(paiseunit)
518
Year
ii) Electricity is provided to Public places like Schools Panchayat Office Health Centre Dispensaries Community
Centres etc and
iv) Mandatory Certification from Gram Panchayat regarding the completion of village electrification should be
obtained
13 Average cost of Power amp Average Realisation
iii) The number of households electrified should be at least 10 of the total number of households in the village
SN Contents Page
1 Capacity Addition Targets and Achievements in 12th Plan amp upto March2019 12
2 Capacity Addition Targets amp Achievements during Apr-2019 and Apr-19 to Apr-19 13
3 Installed Capacity in various Regions including their shares 14-19
Section B - Capacity Addition
(i) CAPACITY ADDTION TARGETS AND ACHIEVEMENTS IN THE 12TH PLAN Figures in MW
TARGET ACH TARGET ACH TARGET ACH TARGET ACH
CENTRAL 14878 15869 6004 2584 5300 2000 26182 20453
STATE 13922 22201 1608 2276 0 0 15530 24477
PRIVATE 43540 53661 3285 619 0 0 46825 54280
ALL INDIA 72340 91730 10897 5479 5300 2000 88537 99209
(ii) CAPACITY ADDITION TARGET AND ACHIEVEMENT FOR 2017-18 (IN MW)
THERMAL HYDRO NUCLEAR
TARGET ACH TARGET ACH TARGET ACH TARGET ACH
CENTRAL 4880 3170 800 390 500 6180 3560
STATE 3546 1760 300 200 0 3846 1960
PRIVATE 2940 3780 205 205 0 3145 3985
ALL INDIA 11366 8710 1305 795 500 0 13171 9505
(iii) CAPACITY ADDITION ACHIEVEMENT FOR 2018-19 (IN MW)
TARGET ACH TARGET ACH TARGET ACH TARGET ACH
CENTRAL 2760 1960 710 110 0 0 3470 2070
STATE 4506 2850 130 30 0 0 4636 2880
PRIVATE 0 972 0 0 0 0 0 972
ALL INDIA 7266 5782 840 140 0 0 8106 5922
12
SECTOR
SECTOR
TOTAL
TOTALNUCLEARHYDROTHERMAL
1 Capacity Addtion Targets and Achievements in the 12th Plan amp upto March2019
SECTORTHERMAL HYDRO NUCLEAR TOTAL
(MW)
Cummulative
Deviation
Target Achievement Target Achievement (+) (-)
Central 6040 500 0 500 0 -500
State 425615 660 0 660 0 -660
Private 0 0 0 0 0 0
Total 1029615 1160 0 1160 0 -1160
Central 600 0 0 0 0 0
State 21099 0 0 0 0 0
Private 379 0 0 0 0 0
Total 118999 0 0 0 0 0
Nuclear Central 700 0 0 0 0 0
Central 7340 500 0 500 0 -500
State 446714 660 0 660 0 -660
Private 379 0 0 0 0 0
Total 1218614 1160 0 1160 0 -1160
Electricity Generation (MU) Targets and Achievements for 2016-17
13
Hydro
All India
Capacity Addition TargetsAchievements during the Month of Apr-2019
Thermal
2 Capacity Addition Targets Achievements During Apr-2019
Schemes Sector
Target 2019-20
Apr-19 to Apr-19Apr-19
11
60
0 0
11
60
0 0 0 0
0
200
400
600
800
1000
1200
1400
Thermal Hydro Nuclear Total
MW
Targets and Achievement during 2019-20Target Achievement
0
200
400
600
800
1000
1200
Thermal Hydro Nuclear Total
1160
0 0
1160
0 0 00
MW
Target Achievement
Coal Lignite Gas Diesel Total
State 1634400 25000 287920 000 1947320 000 869755 69956 2887031
Private 2168083 108000 55800 000 2331883 000 251400 1312046 3895329
Central 1233537 25000 234406 000 1492943 162000 849622 37900 2542465
Sub Total 5036020 158000 578126 000 5772146 162000 1970777 1419902 9324825
State 2156000 104000 284982 000 2544982 000 544650 54789 3144421
Private 3474567 50000 467600 000 3992167 000 48100 2186476 6226743
Central 1650295 000 328067 000 1978362 184000 162000 66630 2390992
Sub Total 7280862 154000 1080649 000 8515511 184000 754750 2307894 11762155
State 1993250 000 79198 28788 2101236 000 1177483 58688 3337407
Private 1187450 25000 532210 27370 1772030 000 000 3749140 5521170
Central 1123502 289000 35958 000 1448460 332000 000 54190 1834650
Sub Total 4304202 314000 647366 56158 5321726 332000 1177483 3862018 10693227
State 624000 000 10000 000 634000 000 353792 27511 1015303
Private 638700 000 000 000 638700 000 39900 111637 790237
Central 1483664 000 000 000 1483664 000 100520 1000 1585184
Sub Total 2746364 000 10000 000 2756364 000 494212 140148 3390724
State 000 000 49771 3600 53371 000 42200 23325 118895
Private 000 000 2450 000 2450 000 000 6104 8554
Central 77002 000 125360 000 202362 000 100500 3000 305862
Sub Total 77002 000 177581 3600 258183 000 142700 32429 433311
State 000 000 000 4005 4005 000 000 525 4530
Private 000 000 000 000 000 000 000 738 738
Central 000 000 000 000 000 000 000 510 510
Sub Total 000 000 000 4005 4005 000 000 1773 5778
State 6407650 129000 711871 36393 7284913 000 2987880 234793 10507586
Private 7468800 183000 1058060 27370 8737230 000 339400 7366140 16442770
Central 5568000 314000 723791 000 6605791 678000 1212642 163230 8659663
Total 19444450 626000 2493722 63763 22627934 678000 4539922 7764163 35610019
Figures at decimal may not tally due to rounding off
Note -
(As per latest information available with MNRE)
Break up of RES all India as on 31032019 is given below (in MW)
459315 3562597 2818071 7764163
A 0 MW
B Apr 2019 0 MW
C
Apr 2019 0 MW
D Net Capacity Added during Apr 2019 A-B-C 0 MW
Sector wise breakup of RES capacity as shown is provisional
Share of installed capacity of BBMB Stations is included in state sector of partner states
BM PowerCogen Waste to Energy
910350 13830
Capacity Added during Apr 2019
Capacity Retired during
Capacity removed due to change
from Conventional to RES during
Islands
ALL INDIA
Abbreviation- SHP=Small Hydro Project (le 25 MW) BP=Biomass Power UampI=Urban amp Industrial Waste Power RES=Renewable Energy Sources
1 RES include SHP BP UampI Solar and Wind Energy Installed capacity in respect of RES (MNRE) as on 31032019
Small
Hydro PowerWind Power
Bio-PowerSolar Power
Total
Capacity
RES
(MNRE)
Northern Region
Western Region
Southern Region
Eastern Region
North Eastern
Region
ALL INDIA INSTALLED CAPACITY (IN MW) OF POWER STATIONS
(As on 30042019)
(UTILITIES)
Region Ownership Sector
Mode wise breakup
Grand TotalThermalNuclear Hydro
Coal Lignite Gas Diesel Total
State 13500 000 180040 000 193540 000 000 000 193540
Private 86922 000 10800 000 97722 000 000 17889 115611
Central 311272 000 20701 000 331973 10283 72309 000 414565
Sub-Total 411694 000 211541 000 623235 10283 72309 17889 723716
State 272000 000 15000 000 287000 000 110282 6930 404212
Private 408078 000 000 000 408078 000 20000 34512 462590
Central 129472 000 53561 000 183034 10094 66370181 500 259998
Sub-Total 809550 000 68561 000 878112 10094 196652 41942 1126799
State 000 000 000 000 000 000 69460 25661 95121
Private 000 000 000 000 000 000 99200 62668 161868
Central 18340 000 6201 000 24541 2895 122388 000 149824
Sub-Total 18340 000 6201 000 24541 2895 291048 88329 406813
State 000 000 17500 000 17500 000 123000 12903 153403
Private 000 000 000 000 000 000 000 6483 6483
Central 50639 000 12907 000 63547 6798 109188 000 179533
Sub-Total 50639 000 30407 000 81047 6798 232188 19386 339419
State 176000 000 15000 000 191000 000 259770 12780 463550
Private 511550 000 000 000 511550 000 28800 115462 655812
Central 85458 000 26401 000 111859 19681 92342 000 223882
Sub-Total 773008 000 41401 000 814409 19681 380912 128242 1343244
State 626000 25000 60380 000 711380 000 109618 2385 823383
Private 280200 108000 000 000 388200 000 10400 730181 1128781
Central 95625 25000 22110 000 142735 55674 73901 34400 306710
Sub-Total 1001825 158000 82490 000 1242315 55674 193919 766966 2258874
State 546900 000 000 000 546900 000 72410 2510 621820
Private 871433 000 000 000 871433 000 84200 288760 1244393
Central 379639 000 54949 000 434588 28948 180253 3000 646789
Sub-Total 1797972 000 54949 000 1852921 28948 336863 294270 2513002
State 000 000 000 000 000 000 125215 6787 132002
Private 9900 000 45000 000 54900 000 8800 52620 116320
Central 34324 000 6966 000 41290 3124 47554 000 91968
Sub-Total 44224 000 51966 000 96190 3124 181569 59407 340290
State 000 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 000 3471 3471
Central 3815 000 1503 000 5317 801 10171 000 16289
Sub-Total 3815 000 1503 000 5317 801 10171 3471 19760
124953 000 29105 000 154058 23703 75145 000 252907
State 1634400 25000 287920 000 1947320 000 869755 69956 2887031
Private 2168083 108000 55800 000 2331883 000 251400 1312046 3895329
Central 1233537 25000 234406 000 1492943 162000 849622 37900 2542465
Grand Total 5036020 158000 578126 000 5772146 162000 1970777 1419902 9324825
Delhi
Haryana
Himachal Pradesh
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
NORTHERN REGION
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
(As on 30042019)
State Ownership Sector
Mode wise breakup
Grand TotalThermalNuclear Hydro
RES
(MNRE)
Jammu amp Kashmir
Punjab
Rajasthan
Uttar Pradesh
Uttarakhand
Chandigarh
Central - Unallocated
Total (Northern
Region)
(As on 30042019)
Coal Lignite Gas Diesel Total
State 000 000 000 000 000 000 000 005 005
Private 000 000 4800 000 4800 000 000 392 5192
Central 46959 000 1967 000 48926 2600 000 000 51526
Sub-Total 46959 000 6767 000 53726 2600 000 397 56723
State 000 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 000 1447 1447
Central 14141 000 4334 000 18475 700 000 000 19175
Sub-Total 14141 000 4334 000 18475 700 000 1447 20622
State 371000 104000 217782 000 692782 000 77200 6470 776452
Private 726567 50000 396000 000 1172567 000 000 833180 2005747
Central 324243 000 42400 000 366643 55900 000 24330 446873
Sub-Total 1421810 154000 656182 000 2231992 55900 77200 863980 3229072
State 540000 000 000 000 540000 000 170366 8396 718762
Private 617400 000 10000 000 627400 000 000 418040 1045440
Central 334238 000 25700 000 359938 27300 152000 30000 569238
Sub-Total 1491638 000 35700 000 1527338 27300 322366 456436 2333440
State 228000 000 000 000 228000 000 12000 1105 241105
Private 885000 000 000 000 885000 000 000 52430 937430
Central 211075 000 000 000 211075 4800 10000 000 225875
Sub-Total 1324075 000 000 000 1324075 4800 22000 53535 1404410
State 1017000 000 67200 000 1084200 000 285084 38813 1408097
Private 1245600 000 56800 000 1302400 000 48100 880441 2230941
Central 466780 000 227273 000 694053 69000 000 12300 775353
Sub-Total 2729380 000 351273 000 3080653 69000 333184 931553 4414390
State 000 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 000 546 546
Central 19560 000 6634 000 26194 900 000 000 27094
Sub-Total 19560 000 6634 000 26194 900 000 546 27640
233300 000 19759 000 253059 22800 000 000 275859
State 2156000 104000 284982 000 2544982 000 544650 54789 3144421
Private 3474567 50000 467600 000 3992167 000 48100 2186476 6226743
Central 1650295 000 328067 000 1978362 184000 162000 66630 2390992
Grand Total 7280862 154000 1080649 000 8515511 184000 754750 2307894 11762155
Goa
Daman amp Diu
Gujarat
Madhya Pradesh
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
WESTERN REGION
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
ThermalNuclear Hydro
RES
(MNRE)
State Ownership Sector
Mode wise breakup
Grand Total
Chhattisgarh
Maharashtra
Dadra amp Nagar
Naveli
Central - Unallocated
Total (Western
Region)
(As on 30042019)
Coal Lignite Gas Diesel Total
State 501000 000 23540 000 524540 000 167360 5618 697518
Private 387388 000 381318 3680 772386 000 000 743342 1515728
Central 154683 12773 000 000 167456 12727 000 25000 205183
Sub-Total 1043071 12773 404858 3680 1464382 12727 167360 773960 2418429
State 558250 000 000 000 558250 000 247993 4122 810365
Private 83945 000 83182 000 167127 000 000 393644 560771
Central 180685 14927 000 000 195612 14873 000 1000 211485
Sub-Total 822880 14927 83182 000 920989 14873 247993 398766 1582621
State 502000 000 000 12792 514792 000 358660 19389 892841
Private 195850 000 000 2520 198370 000 000 1363591 1561961
Central 242780 40140 000 000 282920 69800 000 000 352720
Sub-Total 940630 40140 000 15312 996082 69800 358660 1382979 2807521
State 000 000 000 15996 15996 000 185650 17290 218936
Private 61500 000 17400 000 78900 000 000 19021 97921
Central 86142 28180 35958 000 150280 36200 000 5000 191480
Sub-Total 147642 28180 53358 15996 245176 36200 185650 41311 508337
State 432000 000 52408 000 484408 000 217820 12270 714498
Private 458767 25000 50310 21170 555247 000 000 1229228 1784475
Central 302532 136420 000 000 438952 144800 000 23190 606942
Sub-Total 1193299 161420 102718 21170 1478607 144800 217820 1264688 3105915
State 000 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 000 000 000
Central 000 10000 000 000 10000 000 000 000 10000
Sub-Total 000 10000 000 000 10000 000 000 000 10000
State 000 000 3250 000 3250 000 000 000 3250
Private 000 000 000 000 000 000 000 314 314
Central 14080 10760 000 000 24840 8600 000 000 33440
Sub-Total 14080 10760 3250 000 28090 8600 000 314 37004
142600 35800 000 000 178400 45000 000 000 223400
State 1993250 000 79198 28788 2101236 000 1177483 58688 3337407
Private 1187450 25000 532210 27370 1772030 000 000 3749140 5521170
Central 1123502 289000 35958 000 1448460 332000 000 54190 1834650
Grand Total 4304202 314000 647366 56158 5321726 332000 1177483 3862018 10693227
Kerala
Andhra Pradesh
Telangana
Karnataka
Total (Southern
Region)
Tamil Nadu
NLC
Puducherry
Central - Unallocated
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
SOUTHERN REGION
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
State Ownership Sector
Mode wise breakup
Grand TotalThermalNuclear Hydro
RES
(MNRE)
(As on 30042019)
Coal Lignite Gas Diesel Total
State 000 000 000 000 000 000 000 7070 7070
Private 28100 000 000 000 28100 000 000 25545 53645
Central 384933 000 000 000 384933 000 11000 000 395932
Sub-Total 413033 000 000 000 413033 000 11000 32615 456647
State 42000 000 000 000 42000 000 13000 405 55405
Private 73000 000 000 000 73000 000 000 3495 76495
Central 39374 000 000 000 39374 000 6100 000 45474
Sub-Total 154374 000 000 000 154374 000 19100 3900 177374
State 540000 000 10000 000 550000 000 98600 12195 660795
Private 243700 000 000 000 243700 000 000 35250 278950
Central 76077 000 000 000 76077 000 41000 000 117077
Sub-Total 859777 000 10000 000 869777 000 139600 47445 1056822
State 000 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 000 000 000
Central 698504 000 000 000 698504 000 18620 000 717124
Sub-Total 698504 000 000 000 698504 000 18620 000 717124
State 42000 000 000 000 42000 000 206192 2630 250822
Private 293900 000 000 000 293900 000 000 47346 341246
Central 163390 000 000 000 163390 000 8900 1000 173290
Sub-Total 499290 000 000 000 499290 000 215092 50976 765358
State 000 000 000 000 000 000 36000 5211 41211
Private 000 000 000 000 000 000 39900 001 39901
Central 8703 000 000 000 8703 000 6400 000 15103
Sub-Total 8703 000 000 000 8703 000 82300 5212 96215
112683 000 000 000 112683 000 8501 000 121184
State 624000 000 10000 000 634000 000 353792 27511 1015303
Private 638700 000 000 000 638700 000 39900 111637 790237
Central 1483664 000 000 000 1483664 000 100520 1000 1585184
Grand Total 2746364 000 10000 000 2756364 000 494212 140148 3390724
Total (Eastern
Region)
Bihar
Jharkhand
West Bengal
DVC
Odisha
Sikkim
Central - Unallocated
HydroOwnership Sector
Mode wise breakup
Grand TotalThermalNuclear
RES
(MNRE)
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
State
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
EASTERN REGION
(As on 30042019)
Coal Lignite Gas Diesel Total
State 000 000 32821 000 32821 000 10000 501 43322
Private 000 000 2450 000 2450 000 000 2650 5100
Central 40852 000 43556 000 84408 000 35708 2500 122616
Sub-Total 40852 000 78827 000 119679 000 45708 5651 171038
State 000 000 000 000 000 000 000 10711 10711
Private 000 000 000 000 000 000 000 2939 2939
Central 3705 000 4682 000 8387 000 11655 000 20042
Sub-Total 3705 000 4682 000 8387 000 11655 13650 33692
State 000 000 000 000 000 000 32200 3253 35453
Private 000 000 000 000 000 000 000 012 012
Central 4560 000 10969 000 15529 000 7227 000 22756
Sub-Total 4560 000 10969 000 15529 000 39427 3265 58221
State 000 000 16950 000 16950 000 000 1601 18551
Private 000 000 000 000 000 000 000 009 009
Central 5610 000 43695 000 49305 000 6849 500 56654
Sub-Total 5610 000 60645 000 66255 000 6849 2110 75214
State 000 000 000 3600 3600 000 000 545 4145
Private 000 000 000 000 000 000 000 344 344
Central 4710 000 7157 000 11867 000 9534 000 21401
Sub-Total 4710 000 7157 3600 15467 000 9534 889 25890
State 000 000 000 000 000 000 000 3067 3067
Private 000 000 000 000 000 000 000 100 100
Central 3210 000 4893 000 8103 000 5733 000 13836
Sub-Total 3210 000 4893 000 8103 000 5733 3167 17003
State 000 000 000 000 000 000 000 3647 3647
Private 000 000 000 000 000 000 000 050 050
Central 3105 000 4046 000 7151 000 9794 000 16945
Sub-Total 3105 000 4046 000 7151 000 9794 3697 20642
11250 000 6362 000 17612 000 14000 000 31612
State 000 000 49771 3600 53371 000 42200 23325 118895
Private 000 000 2450 000 2450 000 000 6104 8554
Central 77002 000 125360 000 202362 000 100500 3000 305862
Grand Total 77002 000 177581 3600 258183 000 142700 32429 433311
Assam
Arunachal Pradesh
Meghalaya
Tripura
Manipur
Nagaland
Mizoram
Central - Unallocated
Total (North-
Eastern Region)
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
NORTH-EASTERN REGION
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
State Ownership Sector
Mode wise breakup
Grand TotalThermalNuclear Hydro
RES
(MNRE)
(As on 30042019)
Coal Lignite Gas Diesel Total
State 000 000 000 4005 4005 000 000 525 4530
Private 000 000 000 000 000 000 000 663 663
Central 000 000 000 000 000 000 000 510 510
Sub-Total 000 000 000 4005 4005 000 000 1698 5703
State 000 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 000 075 075
Central 000 000 000 000 000 000 000 000 000
Sub-Total 000 000 000 000 000 000 000 075 075
State 000 000 000 4005 4005 000 000 525 4530
Private 000 000 000 000 000 000 000 738 738
Central 000 000 000 000 000 000 000 510 510
Grand Total 000 000 000 4005 4005 000 000 1773 5778
Andaman amp
Nicobar
Lakshadweep
Total (Islands)
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
ISLANDS
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
State Ownership Sector
Mode wise breakup
Grand TotalThermalNuclear Hydro
RES
(MNRE)
SrNo Contents Page
1 Executive summary of Target and Achievement of Transmission Lines during 2019-20
20(1)
2 List of Transmission Lines CommissionedReady for commissioning during Apr-2019 20(2)
Section C - Transmission Lines
1 Executive summary of Target and Achievement of Transmission Lines during 2019-20 As on 30-04-19
(All figures in circuit kms)
Ce
ntr
al S
ecto
r
Sta
te S
ecto
r
JV
Pri
va
te S
ecto
r
To
tal
Ce
ntr
al S
ecto
r
Sta
te S
ecto
r
JV
Pri
va
te S
ecto
r
To
tal
Ce
ntr
al S
ecto
r
Sta
te S
ecto
r
JV
Pri
va
te S
ecto
r
To
tal
Ce
ntr
al S
ecto
r
Sta
te S
ecto
r
JV
Pri
va
te S
ecto
r
To
tal
Ce
ntr
al S
ecto
r
Sta
te S
ecto
r
JV
Pri
va
te S
ecto
r
To
tal
Ce
ntr
al
Se
cto
r
Sta
te S
ec
tor
JV
Pri
va
te S
ec
tor
Gra
nd
To
tal
0 0 0 0 0 0 0 0 2727 958 2334 6019 2239 3416 1143 6798 781 10023 0 10804 5747 14397 3477 23621
Apr19 Programme 0 0 0 0 0 0 0 0 577 416 557 1550 60 890 203 1153 0 309 0 309 637 1615 760 3012
Achievement 0 0 0 0 0 0 0 0 53 0 0 53 0 20 0 20 0 401 0 401 53 421 0 474
Upto Apr-19 Programme 0 0 0 0 0 0 0 0 577 416 557 1550 60 890 203 1153 0 309 0 309 637 1615 760 3012
Achievement 0 0 0 0 0 0 0 0 53 0 0 53 0 20 0 20 0 401 0 401 53 421 0 474
20(1)
220 kV Grand Total 800 kV 500 kV
Programme 2019-20
Programme
Achievement
HVDC765 kV 400 kV
Line
1 2 3 4 5 6
1 400 Bhadla (PG) - Bhadla (RVPN) line DC PGCIL 53
53
2 400 LILO of one ckt Jhanor - Navsari at Vav Ss DC GETCO 20
3 220 Banda-Chitrakoot Line DC UPPTCL 226
4 220 Gorakhpur (PG)-Gola line DC UPPTCL 82
5 220 Hapur(765) - Faridnagar line SC UPPTCL 11
6 220 Kalikiri - Madanapalli line DC APTRANSCO 60
7 220LILO of Gr Noida -Noida Sec-129 at Noida
Sec-148DC UPPTCL 1
8 220LILO of one Ckt of Badshahpur Pali at Sec-
65 GurgaonDC HVPNL 3
9 220 Sultanpur-Sangipur LILO Section at Amethi DC UPPTCL 18
421
0
474
20(2)
Grand Total
2Transmission Lines (220 kV and above) CommissionedReady for commissioning During Apr-2019
Voltage
Level (kV)Name of Transmission Lines
Circuit
Type
Executing
Agency
CENTRAL SECTOR
Total of CENTRAL SECTOR
STATE SECTOR Sector
Total of STATE SECTOR
PRIVATE SECTOR
Total of PRIVATE SECTOR
SlNo
Length(CKm)
As on 30-04-19
SN Contents Page
1 Executive summary of Target and Achievement of Substations during 2019-20 21(1)
2Sub Stations (220 kV and above) commissionedready for commisssioning during Apr-
201921(2)
Section D - Sub Stations
1 Executive summary of Target and Achievement of Substations during 2019-2020 As on 30-04-19
(All figures in circuit MVA)
Ce
ntr
al S
ecto
r
Sta
te S
ecto
r
JV
Pri
va
te S
ecto
r
To
tal
Ce
ntr
al S
ecto
r
Sta
te S
ecto
r
JV
Pri
va
te S
ecto
r
To
tal
Ce
ntr
al S
ecto
r
Sta
te S
ecto
r
JV
Pri
va
te S
ecto
r
To
tal
Ce
ntr
al S
ecto
r
Sta
te S
ecto
r
JV
Pri
va
te S
ecto
r
To
tal
Ce
ntr
al S
ecto
r
Sta
te S
ecto
r
JV
Pri
va
te S
ecto
r
To
tal
Ce
ntr
al S
ec
tor
Sta
te S
ec
tor
JV
Pri
va
te S
ec
tor
Gra
nd
To
tal
3000 0 0 3000 0 0 0 0 18000 3000 6000 27000 5205 19665 4260 29130 800 21786 0 22586 27005 44451 10260 81716
Apr19 Programme 0 0 0 0 0 0 0 0 3000 0 3000 6000 0 1000 2000 3000 0 800 0 800 3000 1800 5000 9800
Achievement 0 0 0 0 0 0 0 0 500 0 0 500 815 1980 0 2795 0 1305 0 1305 1315 3285 0 4600
Upto Apr-19 Programme 0 0 0 0 0 0 0 0 3000 0 3000 6000 0 1000 2000 3000 0 800 0 800 3000 1800 5000 9800
Achievement 0 0 0 0 0 0 0 0 500 0 0 500 815 1980 0 2795 0 1305 0 1305 1315 3285 0 4600
21(1)
220 kV Grand Total 800 kV 500 kV
Programme 2019-20
Programme
Achievement
HVDC765 kV 400 kV
As on 30-04-19
Sl Voltage Ratio Capacity
No (kVkV) (MWMVA)
1 2 3 4 5
1 Bhadla SS (3x1500 3x500 MVA) 765400 PGCIL 500
2 Extn at Tumkur (Pavagada ) PS (2x500 MVA) 400220 PGCIL 500
3 Bongaigaon (2nd ICT) Ss 400220 PGCIL 315
Total of CENTRAL SECTOR 1315
4 Motiram Adda Gorakhpur (Aug) (Additional TF) 400220 UPPTCL 240
5 Muradnagar-II Ghaziabad (Aug) (Additional TF) 400220 UPPTCL 240
6 Noida Sec- 148 GBNagar (New) 400220 UPPTCL 5007 Sarnath Varanasi (Aug) TF- II (500-315) 400220 UPPTCL 1858 Sarojininagar Lucknow Aug) TF- II (500-315) 400220 UPPTCL 185
9 Unnao (Aug) TF-III 400220 UPPTCL 31510 Nawada SS 400220 HVPNL 31511 Kharepatan SS 22033 MSETCL 2512 Prathipadu SS 220132 APTRANSCO 10013 Pali Ss 22066 HVPNL 160
14 A-5 Faridabad Ss 22066 HVPNL 60
15 Rentachintala Ss Aug(3X100-2x100) 220132 APTRANSCO 10016 Amethi Ss 220132 UPPTCL 160
17 Gajokhar Varanasi (Aug) TF- II (160-100) 220132 UPPTCL 60
18 Gola Gorakhpur (New) 220132 UPPTCL 160
19 Khurja Bulandshahr (Aug) TF- II (200-160) 220132 UPPTCL 40
20 RC Green GB Nagar (Aug) TF-II (160-100) 220132 UPPTCL 60
21 Sikandrabad Bulandshahr (Aug) (Additional TF) 220132 UPPTCL 160
22 Sitapur (Aug) (Additional TF) 220132 UPPTCL 160
23 Sohawal Ayodhya (Aug) TF-II (160-100) 220132 UPPTCL 60
TOTAL STATE SECTOR 3285
GRAND TOTAL 4600
21(2)
CENTRAL SECTOR
STATE SECTOR
2Sub-Stations (220 kV and above) CommissionedReady for commissioning During Apr-2019
Name of Sub Stations Executing Agency
SN Contents Page
1 Electricity Generation (MU) Targets and Achievements for 2019-20 22
Section E - Electricity Generation
Programme Achievement Ach Programme Achievement Ach
Central Sector 37545100 3177900 3129530 9848 3177900 3129530 9848
State Sector 37498600 3322500 2950558 8881 3322500 2950558 8881
PvtIPP Sector 37346200 3236400 3195940 9875 3236400 3195940 9875
PvtUTL Sector 1823100 159300 165579 10394 159300 165579 10394
Total 114213000 9896100 9441607 9541 9896100 9441607 9541
Central Sector 5661700 386100 481390 12468 386100 481390 12468
State Sector 6680500 498200 536514 10769 498200 536514 10769
PvtIPP Sector 1206900 57300 80405 14032 57300 80405 14032
PvtUTL Sector 144100 12300 10930 8886 12300 10930 8886
Total 13693200 953900 1109239 11628 953900 1109239 11628
Central Sector 4472000 367300 317765 8651 367300 317765 8651
Total 4472000 367300 317765 8651 367300 317765 8651
Bhutan Import 621800 17500 24396 13941 17500 24396 13941
Central Sector 47678800 3931300 3928685 9993 3931300 3928685 9993
State Sector 44179100 3820700 3487072 9127 3820700 3487072 9127
Pvt Sector 40520300 3465300 3452854 9964 3465300 3452854 9964
Total 133000000 11234800 10893007 9696 11234800 10893007 9696
Provisional based on actual-cum-Assesment
Figs in MU
Cummulative
Achievement
Cummulative
Achievement
Mar-19 Mar-18 Upto Mar-2019 Upto Mar-2018
984785 869291 12675910 10183949
22
1 Electricity Generation (MU) Targets and Achievememts for 2019-20
All India Energy Generation During Apr-19 to Apr-19 (MU)
Target (2019-20)Apr-19 to Apr-19
Sector
Hydro
Thermal
Nuclear
Renewable Energy Generation
Achievement
Apr-2019
98961
95393673
112348
94416
11092
3178
108930
0
20000
40000
60000
80000
100000
120000
Thermal Hydro Nuclear Total
Programme
Achievement
SN Contents Page
1 Energy Power Supply Position (Provisional) for Apr-2019 and during Apr-19 to Apr-19 23
2 Peak Power Supply Position (Provisional) for Apr-2019 and during Apr-19 to Apr-19 24
3 Energy Power Supply Position (Revised) for Mar-2019 and during Apr-19 to Mar-19 25
4 Peak Power Supply Position (Revised) for Mar-2019 and during Apr-19 to Mar-19 26
5 Notified Power cuts Restrictions on Industries during Apr-2019 27
6 Power Supply to Agricultural Sector during Apr-2019 28
Section F - Power supply position
आकड़ मममलयन यननट नट Figures in MU net
ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied
कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )
चडीगढ़ Chandigarh 117 117 0 00 117 117 0 00
दिलली Delhi 2698 2698 1 00 2698 2698 1 00
हरियजणज Haryana 3773 3773 0 00 3773 3773 0 00
दहमजचल परिश Himachal Pradesh 777 777 0 00 777 777 0 00
रमम कशमीि Jammu amp Kashmir 1604 1296 308 192 1604 1296 308 192
परजब Punjab 3646 3646 0 00 3646 3646 0 00
िजरसथजन Rajasthan 6210 6208 2 00 6210 6208 2 00
उतति परिश Uttar Pradesh 10179 10148 32 03 10179 10148 32 03
उततिजखड Uttarakhand 1120 1120 0 00 1120 1120 0 00
उततरी कषतर Northern Region 30094 29786 308 10 30094 29786 308 10
छततीसगढ़ Chhattisgarh 2684 2676 8 03 2684 2676 8 03
गरिजत Gujarat 10718 10718 0 00 10718 10718 0 00
मधय परिश Madhya Pradesh 6006 6006 0 00 6006 6006 0 00
महजिजषटर Maharashtra 14308 14308 0 00 14308 14308 0 00
िमन औि दिउ Daman amp Diu 220 220 0 00 220 220 0 00
िजिि व नगि हवली Dadra amp Nagar Haveli 552 552 0 00 552 552 0 00
गोवज Goa 388 388 0 00 388 388 0 00
पशचिमी कषतर Western Region 34875 34868 8 00 34875 34868 8 00
आनधर परिश Andhra Pradesh 5708 5708 0 00 5708 5708 0 00
तलगजनज Telangana 5725 5725 0 00 5725 5725 0 00
कनजाटक Karnataka 7003 7003 0 00 7003 7003 0 00
किल Kerala 2402 2400 2 01 2402 2400 2 01
तममल नजड Tamil Nadu 10010 10010 0 00 10010 10010 0 00
पडचिी Puducherry 263 263 0 00 263 263 0 00
लकष-दवीप Lakshadweep 4 4 0 0 4 4 0 0
दकषकषणी कषतर Southern Region 31111 31109 2 00 31111 31109 2 00
बबहजि Bihar 2589 2589 0 00 2589 2589 0 00
िजमोिि घजटी ननगम DVC 1772 1772 0 00 1772 1772 0 00
झजिखणड Jharkhand 689 689 0 00 689 689 0 00
ओडडशज Odisha 2689 2689 1 00 2689 2689 1 00
पशशचम बगजल West Bengal 5075 5075 0 00 5075 5075 0 00
मसशककम Sikkim 37 37 0 00 37 37 0 00
अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 7 29 27 2 7
परवी कषतर Eastern Region 12851 12850 1 00 12851 12850 1 00
अरणजचल परिश Arunachal Pradesh 66 66 0 05 66 66 0 05
असम Assam 766 709 57 75 766 709 57 75
मणणपि Manipur 68 67 1 15 68 67 1 15
मघजलय Meghalaya 170 160 10 59 170 160 10 59
ममज़ोिम Mizoram 54 53 0 08 54 53 0 08
नजगजलड Nagaland 54 54 0 08 54 54 0 08
बिपिज Tripura 122 120 1 12 122 120 1 12
उततर-परवी कषतर North-Eastern Region 1300 1228 71 55 1300 1228 71 55
समपणण भारत All India 110231 109842 389 04 110231 109842 389 04
23
ऊरजा पनत ा म कमी ऊरजा पनत ा म कमीEnergy not Supplied
Excludes energy exported to Bangladesh
Energy not Supplied
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
ऊराण वरवदयत आपरत ण शथिरत ररपोरण (परवाणरवलोकन) Energy Power Supply Position Report (Provisional)
राजयState
अपरल 2019 April2019 अपरल2019 -अपरल2019 April2019 to April2019
अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met
कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )
चडीगढ़ Chandigarh 256 256 0 00 256 256 0 00
दिलली Delhi 5664 5664 0 00 5664 5664 0 00
हरियजणज Haryana 8127 8127 0 00 8127 8127 0 00
दहमजचल परिश Himachal Pradesh 1387 1387 0 00 1387 1387 0 00
रमम कशमीि Jammu amp Kashmir 2826 2261 565 200 2826 2261 565 200
परजब Punjab 7015 7015 0 00 7015 7015 0 00
िजरसथजन Rajasthan 10560 10560 0 00 10560 10560 0 00
उतति परिश Uttar Pradesh 19935 19935 0 00 19935 19935 0 00
उततिजखड Uttarakhand 1922 1922 0 00 1922 1922 0 00
उततरी कषतर Northern Region 54476 53985 491 09 54476 53985 491 09
छततीसगढ़ Chhattisgarh 4596 4574 22 05 4596 4574 22 05
गरिजत Gujarat 17871 17865 6 00 17871 17865 6 00
मधय परिश Madhya Pradesh 10018 10018 0 00 10018 10018 0 00
महजिजषटर Maharashtra 23158 23150 8 00 23158 23150 8 00
िमन औि दिउ Daman amp Diu 341 340 1 02 341 340 1 02
िजिि व नगि हवली Dadra amp Nagar Haveli 818 818 0 00 818 818 0 00
गोवज Goa 594 594 0 00 594 594 0 00
पशचिमी कषतर Western Region 56242 56222 20 00 56242 56222 20 00
आनधर परिश Andhra Pradesh 9151 9151 0 00 9151 9151 0 00
तलगजनज Telangana 10191 10191 0 00 10191 10191 0 00
कनजाटक Karnataka 12681 12681 0 00 12681 12681 0 00
किल Kerala 4309 4300 8 02 4309 4300 8 02
तममल नजड Tamil Nadu 15972 15972 0 00 15972 15972 0 00
पडचिी Puducherry 482 480 2 05 482 480 2 05
लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0
दकषकषणी कषतर Southern Region 49155 49103 52 01 49155 49103 52 01
बबहजि Bihar 5357 5357 0 00 5357 5357 0 00
िजमोिि घजटी ननगम DVC 3039 3039 0 00 3039 3039 0 00
झजिखणड Jharkhand 1266 1266 0 00 1266 1266 0 00
ओडडशज Odisha 5389 5389 0 00 5389 5389 0 00
पशशचम बगजल West Bengal 8666 8666 0 00 8666 8666 0 00
मसशककम Sikkim 100 100 0 00 100 100 0 00
अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7
परवी कषतर Eastern Region 23349 23349 0 00 23349 23349 0 00
अरणजचल परिश Arunachal Pradesh 139 136 3 22 139 136 3 22
असम Assam 1712 1667 45 26 1712 1667 45 26
मणणपि Manipur 197 188 9 46 197 188 9 46
मघजलय Meghalaya 336 336 0 00 336 336 0 00
ममज़ोिम Mizoram 116 113 3 26 116 113 3 26
नजगजलड Nagaland 157 131 26 166 157 131 26 166
बिपिज Tripura 292 291 1 03 292 291 1 03
उततर-परवी कषतर North-Eastern Region 2848 2780 68 24 2848 2780 68 24
समपणण भारत All India 177411 176810 601 03 177411 176810 601 03
24
मजग की पनत ा म कमी Demand not Met
Excludes the supply to Bangladesh
राजयStateअपरल 2019 April2019
मजग की पनत ा म कमी Demand not Met
अधिकतम वरवदयत आपरत ण शथिरत ररपोरण (परवाणरवलोकन) Peak Power Supply Position Report (Provisional)
आकड़ मगज वजट नट Figures in MW netअपरल2019 -अपरल2019 April2019 to April2019
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
आकड़ मममलयन यननट नट Figures in MU net
ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied
कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )
चडीगढ़ Chandigarh 96 96 0 00 1561 1561 0 00
दिलली Delhi 1931 1930 1 00 32299 32282 17 01
हरियजणज Haryana 3658 3658 0 00 53665 53665 0 00
दहमजचल परिश Himachal Pradesh 832 830 2 02 9850 9618 232 24
रमम कशमीि Jammu amp Kashmir 1767 1414 353 200 19593 15868 3725 190
परजब Punjab 3585 3585 0 00 55288 55275 13 00
िजरसथजन Rajasthan 6774 6770 4 01 79826 79637 189 02
उतति परिश Uttar Pradesh 8754 8691 63 07 117101 116118 984 08
उततिजखड Uttarakhand 1067 1067 0 00 13845 13753 92 07
उततरी कषतर Northern Region 28464 28041 423 15 383028 377776 5251 14
छततीसगढ़ Chhattisgarh 2464 2457 8 03 26130 26076 54 02
गरिजत Gujarat 9890 9890 0 00 116588 116572 15 00
मधय परिश Madhya Pradesh 6236 6236 0 00 75667 75665 2 00
महजिजषटर Maharashtra 13631 13631 0 00 158285 158148 137 01
िमन औि दिउ Daman amp Diu 221 221 0 00 2557 2557 0 00
िजिि व नगि हवली Dadra amp Nagar Haveli 553 553 0 00 6317 6317 0 00
गोवज Goa 362 362 0 00 4283 4280 3 01
पशचिमी कषतर Western Region 33357 33349 8 00 389827 389615 212 01
आनधर परिश Andhra Pradesh 6072 6071 1 00 63735 63677 58 01
तलगजनज Telangana 6930 6929 1 00 66697 66635 62 01
कनजाटक Karnataka 7614 7612 1 00 71759 71690 69 01
किल Kerala 2489 2488 1 00 25029 24911 118 05
तममल नजड Tamil Nadu 10247 10245 2 00 109375 109273 102 01
पडचिी Puducherry 252 251 1 04 2761 2751 10 03
लकष-दवीप Lakshadweep 4 4 0 0 46 46 0 0
दकषकषणी कषतर Southern Region 33605 33597 8 00 339355 338938 417 01
बबहजि Bihar 2319 2318 1 00 30052 29827 225 07
िजमोिि घजटी ननगम DVC 1773 1772 1 00 22365 21995 369 17
झजिखणड Jharkhand 698 697 1 01 8682 8461 221 25
ओडडशज Odisha 2583 2582 1 00 31810 31781 30 01
पशशचम बगजल West Bengal 4585 4584 2 00 52237 52078 159 03
मसशककम Sikkim 41 41 0 00 513 512 0 01
अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 67 346 323 23 67
परवी कषतर Eastern Region 11999 11995 5 00 145658 144654 1004 07
अरणजचल परिश Arunachal Pradesh 61 60 0 06 864 855 9 10
असम Assam 680 656 23 34 9532 9204 328 34
मणणपि Manipur 68 68 1 09 916 906 10 11
मघजलय Meghalaya 173 173 0 03 1955 1953 1 01
ममज़ोिम Mizoram 50 49 0 09 668 661 8 12
नजगजलड Nagaland 58 57 1 20 902 809 93 103
बिपिज Tripura 150 150 0 00 1859 1837 21 11
उततर-परवी कषतर North-Eastern Region 1240 1214 26 21 16696 16225 471 28
समपणण भारत All India 108665 108196 469 04 1274564 1267209 7355 06
Note The revised data for March 2019 is not avaliable
Excludes energy exported to Bangladesh
राजयState
ऊराण वरवदयत आपरत ण शथिरत ररपोरण (परवाणरवलोकन) Energy Power Supply Position Report (Provisional)
25
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
Energy not Supplied Energy not Supplied
मािण2019 March2019 अपरल2018 -मािण2019 April2018 to March2019
ऊरजा पनत ा म कमी ऊरजा पनत ा म कमी
अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met
कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )
चडीगढ़ Chandigarh 223 223 0 00 369 369 0 00
दिलली Delhi 4016 4016 0 00 7016 7016 0 00
हरियजणज Haryana 6544 6544 0 00 10270 10270 0 00
दहमजचल परिश Himachal Pradesh 1683 1683 0 00 1700 1700 0 00
रमम कशमीि Jammu amp Kashmir 3277 2622 655 200 3277 2622 655 200
परजब Punjab 6564 6564 0 00 12638 12638 0 00
िजरसथजन Rajasthan 11885 11885 0 00 13276 13276 0 00
उतति परिश Uttar Pradesh 16220 16220 0 00 20498 20062 436 21
उततिजखड Uttarakhand 2002 2002 0 00 2216 2216 0 00
उततरी कषतर Northern Region 47925 47356 569 12 63166 61726 1440 23
छततीसगढ़ Chhattisgarh 4444 4128 316 71 4444 4270 174 39
गरिजत Gujarat 16263 16263 0 00 17053 16963 90 05
मधय परिश Madhya Pradesh 12328 12323 5 00 13815 13815 0 00
महजिजषटर Maharashtra 22361 22291 70 03 23864 23254 610 26
िमन औि दिउ Daman amp Diu 336 336 0 01 357 356 1 02
िजिि व नगि हवली Dadra amp Nagar Haveli 800 799 1 01 816 815 1 01
गोवज Goa 538 538 0 00 596 596 0 00
पशचिमी कषतर Western Region 53132 52965 167 03 56675 55821 853 15
आनधर परिश Andhra Pradesh 8977 8977 0 00 9459 9453 6 01
तलगजनज Telangana 10471 10471 0 00 10815 10815 0 00
कनजाटक Karnataka 12841 12841 0 00 12841 12841 0 00
किल Kerala 4264 4228 36 09 4264 4228 36 09
तममल नजड Tamil Nadu 15712 15712 0 00 15712 15712 0 00
पडचिी Puducherry 427 412 15 34 427 412 15 34
लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0
दकषकषणी कषतर Southern Region 49464 49464 0 00 49464 49464 0 00
बबहजि Bihar 4633 4633 0 00 5115 5084 31 06
िजमोिि घजटी ननगम DVC 3035 3035 0 00 3035 3035 0 00
झजिखणड Jharkhand 1210 1210 0 00 1339 1291 48 36
ओडडशज Odisha 4827 4827 0 00 5357 5357 0 00
पशशचम बगजल West Bengal 8287 8287 0 00 9130 9123 7 01
मसशककम Sikkim 100 100 0 00 106 106 0 00
अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7
परवी कषतर Eastern Region 21658 21658 0 00 23141 22733 408 18
अरणजचल परिश Arunachal Pradesh 133 131 2 15 138 138 0 01
असम Assam 1539 1508 31 20 1865 1809 56 30
मणणपि Manipur 204 199 5 25 219 216 3 12
मघजलय Meghalaya 357 357 0 00 374 372 1 04
ममज़ोिम Mizoram 108 105 3 28 121 119 2 17
नजगजलड Nagaland 127 125 2 16 156 138 18 116
बिपिज Tripura 249 249 0 00 298 293 5 17
उततर-परवी कषतर North-Eastern Region 2540 2535 5 02 2967 2850 117 39
समपणण भारत All India 169464 168745 719 04 177022 175528 1494 08
Note The revised data for March 2019 is not avaliable 26
अधिकतम वरवदयत आपरत ण शथिरत ररपोरण (परवाणरवलोकन) Peak Power Supply Position Report (Provisional)
आकड़ मगज वजट नट Figures in MW net
राजयStateमािण2019 March2019 अपरल2018 -मािण2019 April2018 to March2019
मजग की पनत ा म कमी मजग की पनत ा म कमी Demand not MetDemand not Met
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
Excludes the supply to Bangladesh
अपरल 2019 April2019 अपरल2018 -मािण2019 April2019 to April2019
उततरी कषतर Northern Region
चडीगढ़ Chandigarh(Data Not Received)दिलली Delhi
हरियजणज Haryana
दहमजचल परिश Himachal Pradeshरमम कशमीि Jammu amp Kashmir(Data
Not Received)परजब Punjab
िजरसथजन Rajasthanउतति परिश Uttar Pradesh
उततिजखड Uttarakhand
पशचिमी कषतर Western Region
छततीसगढ़ Chhattisgarh
Apr-Nov 2018- No cuts
Maximum Demand cut-58MW
Energy cut- 00020-00032 MUsday
गरिजत Gujarat
मधय परिश Madhya Pradesh
महजिजषटर Maharashtra
गोवज Goa
दकषकषणी कषतर Southern Region
आनधर परिश Andhra Pradesh
तलगजनज Telangana
कनजाटक Karnataka
किल Kerala
तममल नजड Tamil Nadu
पडचिी Puducherryपरवी कषतर Eastern Region
बबहजि Bihar
झजिखणड Jharkhand
ओडडशज Odisha
पशशचम बगजल West Bengal
No N
otifie
d Cu
ts
27
मािण 2019 म इडथरीर पर वरवदयत करौती का वरवरवरण Notified Power CutsRestrictions on Industries during April2019
राजय कषतर State Regionऊराणमाग करौती EnergyDemand Cut
No N
otifie
d Cu
tsNo
Notifie
d Cu
ts
अपरल2019 April 2019 अपरल2019 -अपरल2019 April2019 to April2019
उततरी कषतर Northern Region
चडीगढ़ Chandigarh Data not received Data not received
दिलली Delhi Data not received Data not received
हरियजणज Haryana 0811 hrsday 0811 hrsday
दहमजचल परिश Himachal Pradesh HPSEBL has only 2 agriculture consumers and uninterrupted
power is being supplied to agriculture sector
HPSEBL has only 2 agriculture consumers and uninterrupted
power is being supplied to agriculture sector
रमम कशमीि Jammu amp Kashmir Data not received Data not received
परजब Punjab 379 hrsday 379 hrsday
िजरसथजन Rajasthan 0630 hrsday 0630 hrsday
उतति परिश Uttar Pradesh 2157 hrsday 2157 hrsday
उततिजखड Uttarakhand 2359 hrsday 2359 hrsday
पशचिमी कषतर Western Region
छततीसगढ़ Chhattisgarh 18 hrsday 18 hrsday
गरिजत Gujarat 8 hrsday 8 hrsday
मधय परिश Madhya Pradesh Three-Phase Supply(Irrigation)- 0953 hrs day Three-Phase
(Mixed) Supply - 2334 hrs day
Three-Phase Supply(Irrigation)- 0953 hrs day Three-Phase
(Mixed) Supply - 2334 hrs day
महजिजषटर Maharashtra Three-Phase Supply(Irrigation)- 9 hrs day Three-Phase Supply(Irrigation)- 9 hrs day
गोवज Goa No restriction No restriction
दकषकषणी कषतर Southern Region
आनधर परिश Andhra Pradesh 07 hrsday 07 hrsday
तलगजनज Telangana 24 hrsday 24 hrsday
कनजाटक Karnataka 6 hrsday 6 hrsday
किल Kerala No Restrictions No Restrictions
तममल नजड Tamil Nadu 9 hrsday (6 hrs during day time and 3 hrs during night time) 9 hrsday (6 hrs during day time and 3 hrs during night time)
पडचिी Puducherry No Restrictions No Restrictions
परवी कषतर Eastern Region
बबहजि Bihar 18 hrsday 18 hrsday
झजिखणड Jharkhand 20 hrsday 20 hrsday
ओडडशज Odisha 24 hrsday 24 hrsday
पशशचम बगजल West Bengal 23 hrsday 23 hrsday
28
मारच 2019 कषि कषतर को षिदयत आपरतच का षििरण Power Supply to Agricultural Sector during March2019
राजय कषतर State Regionऔसत वरवदयत आपरत ण घनरो म Average Hours of Supply
On segregated feeders
SNo Contents Page
1 Growth of Installed Capacity since 6th Plan 29
2 Progress of Transmission Sector since 6th Plan 30
3 All India Yearly Coal consumption for Power Generation (Utilities)
4 All India Annual Per Capita Consumption of Electricity since -2006
5 Average cost of power supply amp Average realisation (Paisakwh)
6 Growth of Rural Electrification amp Pump Sets Energisation
7 Status of Hydro Schemes Cleared by the CEA in Apr-2019
Section G - Growth of Power Sector
31
32
(In MW)
Coal Gas Diesel Total
End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472
End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634
End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537
End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596
End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921
End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703
End of 12th Plan 19216288 2532938 83763 21832988 6780 4447842 50018 31960630
Up to Apr-2019 20070450 2493722 63763 22627934 678000 4539922 7764163 35610019
Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-17) = 51529 MW
Electricity Generation (MU) Targets and Achievements for 2016-17
Coal Gas Diesel Nuclear Hydro Res Total
2007045 2493722 637629 678000 453992 77641625 22925174
29
1 Growth of Installed Capacity Since 6th Plan
Plan YearThermal
Nuclear Hydro RES (MNRE) Total
2007045
2493722637629
678000
4539922
77641625
Total Installed Capacity 35610019 MW
Coal Gas Diesel Nuclear Hydro Res
Progress of Transmission Sector in the Country up to April 2019
1 TRANSMISSION LINES (All fig in CKM)
At the end of
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
6th plan 0 0 0 0 0 0 0 0 0 0 0 0 1831 4198 0 6029 1641 44364 0 46005 3472 48562 0 52034
7th plan 0 0 0 0 0 0 0 0 0 0 0 0 13068 6756 0 19824 4560 55071 0 59631 17628 61827 0 79455
8th plan 0 0 0 0 1634 0 0 1634 0 0 0 0 23001 13141 0 36142 6564 73036 0 79600 31199 86177 0 117376
9th plan 0 0 0 0 3234 1504 0 4738 751 409 0 1160 29345 20033 0 49378 8687 88306 0 96993 42017 110252 0 152269
10th plan 0 0 0 0 4368 1504 0 5872 1775 409 0 2184 48708 24730 0 73438 9444 105185 0 114629 64295 131828 0 196123
11th Plan 0 0 0 0 5948 1504 1980 9432 4839 411 0 5250 71023 30191 5605 106819 10140 125010 830 135980 91950 157116 8415 257481
12th Plan 6124 0 0 6124 5948 1504 1980 9432 25465 1177 4598 31240 92482 48240 17065 157787 11014 151276 978 163268 141033 202197 24621 367851
13th Plan (Up
to Mar2019)6124 0 0 6124 5948 1504 1980 9432 33692 1512 6605 41809 101335 58238 21173 180746 11734 162552 1010 175296 158833 223806 30768 413407
13th Plan (Up
to Apr-19)6124 0 0 6124 5948 1504 1980 9432 33745 1512 6605 41862 101335 58258 21173 180766 11734 162953 1010 175697 158886 224227 30768 413881
27150 600 MW of 132 kV Inter-Regional power transmission capacity links which are operated radially from time to time is not added in the total
75050
47900
24000
99050
30
Grand Total
Note - The figure upto the end of 10th plan in for stringing progress including the lines not commissioned Now only commissioned lines are reckoned Accordingly the figure for 10th plan (end) may read
as 187555 after adjusting with (-) 10852 Ckm
Inter-regional Power Transfer Capacity (MW)
plusmn 800 kV HVDC plusmn 500 kV HVDC 765 kV 400 kV 220 kV
IR addition in 12th
Plan (up to March
2017)
Inter-regional
Transmission
Capacity at the end
of Plan Period 2017-
22 (as on April19)
IR at the end of 11th
PlanIR at the end of 12th
Plan
IR Capacity Addition
at the end of Plan
Period 2017-22 (Till
April 19)
2004-05 27800
2005-06 28100
2006-07 30200
2007-08 33000
2008-09 35500
2009-10 36700
2010-11 38700
2011-12 41756
2012-13 45460
2013-14 48940
2014-15 53040
2015-16 54590
2016-17 57430
2017-18 60800
2018-19 62890
Year
2005-06
2006-07
2007-08
2008-09
2009-10
2010-11
2011-12
2012-13
2013-14
2014-15
2015-16
2016-17
2017-18
2018-19
2004-05 254 209 7568
2005-06 260 221 7636
2006-07 276 227 7423
2007-08 293 239 7727
2008-09 340 263 8713
2009-10 355 268 8870
2010-11 398 303 11975
2011-12 455 330 13514
2012-13 501 376 14867
2013-14 518 175
2014-15 520
Source- PFC Reports on the performance of State Power Utilities 31
1181
7335
7786
91441
8188
88363
957
1010
1075
1122
1149
(GrossGen+ Net Import) Mid-year population Provisional
5 Average cost of power supply amp average realization ( paiseKWH )
Yearcost of supply
(paiseunit)
Realization(paiseunit)
Including AgricultureOnly
Agriculture
6719
7171
3 All India yearly Coal Consumption for Power Generation (Utilities)
YEARCoal Consumption
Million Tonnes
4 All India Annual per Capita consumption of Electricity Since 2006
Per Capita Consumption ( kWh)
6314
Sl
NoExecuting Agency
Installed
Capacity (MW)Cost (Rs crore)
Date of
Clearance
32
Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as
Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received
from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made
available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified
villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is
independent of the earlier published reports
No Hydro Electric Project has been issued concurrenceAppraisal letter by CEA during April 2019
7 Status of Hydro Schemes Cleared by the CEA in Apr-2019
Name of Scheme
1999-002000-01
297594
010408 to 310309010409 to 310310
10th Plan
2005-062006-07
322968331020
6 Growth Of Rural Electrification amp Pumpsets Energisation
Plan Year
9th Plan2002-03
134092626
4111
Pump Sets Energised Villages Electricfied (Nos)
2001-02
284064367244
1218
27801997-981998-99
3207
482864
12632
1576036
4451722594
15455554
2314176
397343611750
2093311060316074
65109527813884
46708
18423975
499150
2003-042004-05
5743
9769
Cumu upto End of 10th Plan
010407 to 310308
010410 to 310311557976840909
010411 to 310312
412667
86293726
No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification
since 2004-05
65291374575 296361511th Plan
Cumu upto End of 11th Plan
596556 21212860
557439Cummulative up to end of 12th Plan
SN Contents Page
1 Rate of sale of power for the year 2016-17 33-41
RATE OF SALE OF POWER FOR THE YEAR 2016-17
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) NORTHERN REGION
CENTRAL SECTOR
BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 18000 66900 19800
CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 54000 222400 21600
CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 30000 144400 19600
CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 23100 91700 42600
PARBATI - III HPS NHPC LTD HYDRO-HYDRO 52000 68200 54800
DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 28000 95600 30000
CHUTAK NHPC LTD HYDRO-HYDRO 4400 22000 79800
DULHASTI HPS NHPC LTD HYDRO-HYDRO 39000 228000 56400
SALAL HPS NHPC LTD HYDRO-HYDRO 69000 342300 11000
TANAKPUR HPS NHPC LTD HYDRO-HYDRO 9420 43000 29600
URI HPS -I NHPC LTD HYDRO-HYDRO 48000 280300 16000
URI HPS - II NHPC LTD HYDRO-HYDRO 24000 147300 48600
NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 4500 24600 88200
SEWA - II NHPC LTD HYDRO-HYDRO 12000 47100 43400
ANTA CCPP NTPC LTD THERMAL-GASN 41930 67539 32400
AURAIYA CCPP NTPC LTD THERMAL-GASN 66336 53501 39100
BADARPUR TPS NTPC LTD THERMAL-COAL 70500 159153 44800
DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 84000 296170 42300
DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 98000 526686 46300
DADRI CCPP NTPC LTD THERMAL-GASHSD 82978 227469 33000
FARIDABAD CCPP NTPC LTD THERMAL-GASN 43159 115577 30800
RIHAND STPS I NTPC LTD THERMAL-COAL 100000 596766 24500
RIHAND STPS II NTPC LTD THERMAL-COAL 100000 737069 24600
RIHAND STPS III NTPC LTD THERMAL-COAL 100000 706546 30600
SINGRAULI STPS NTPC LTD THERMAL-COAL 200000 1394068 20400
TANDA TPS NTPC LTD THERMAL-COAL 44000 295438 40800
UNCHAHAR TPS I NTPC LTD THERMAL-COAL 42000 256454 39800
UNCHAHAR TPS II NTPC LTD THERMAL-COAL 42000 273577 38900
UNCHAHAR TPS III NTPC LTD THERMAL-COAL 21000 142780 43000
KOLDAM NTPC LTD HYDRO-HYDRO 80000 363260 43600
NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 303575 25841
RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 108000 668677 35374
NJHPS SJVNL HYDRO-HYDRO 150000 699496 23820
RAMPUR HPS SJVNL HYDRO-HYDRO 41202 195982 32260
TEHRI HPP THDC HYDRO-HYDRO 100000 272543 51800
KOTESHWAR HEP THDC HYDRO-HYDRO 40000 106244 53400
IGSTPS JHAJJAR ARAVALI P CPL THERMAL-COAL 150000 510429 49490
NEYVELI BARSINGSAR NEYVELI LIG CORP LTD THERMAL-LIG 25000 127520 38040
STATE SECTOR
PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 21000 14222 48200
PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 21000 19205 48400
PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 25000 102257 42600
PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 25000 62107 41800
DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 60000 312213 41000
RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 120000 35767442200
WYC HYDEL STATION HPGCL HYDRO-HYDRO 6240 20365 24900
GIRI POWER HOUSE HPSEB HYDRO-HYDRO 6000 13958 7600
ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 1695 5467 11900
BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 12000 18528 6700
GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 2250 7462 22500
BASSI POWER HOUSE HPSEB HYDRO-HYDRO 6600 29649 7500
BINWA POWER HOUSE HPSEB HYDRO-HYDRO 600 2749 19300
ANNEXURE-I
RATE OF SALE OF POWER FOR THE YEAR 2016-2017
Page 33
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) GAJ POWER HOUSE HPSEB HYDRO-HYDRO 1050 2914 26700
BANER POWER HOUSE HPSEB HYDRO-HYDRO 1200 2864 16200
HOLI POWER HOUSE HPSEB HYDRO-HYDRO 300 616 22500
THIROT POWER HOUSE HPSEB HYDRO-HYDRO 450 1126 22500
KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 1200 3064 22500
LARJI POWER HOUSE HPSEB HYDRO-HYDRO 12600 53677 23700
NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 250 750 31000
CHABA POWER HOUSE HPSEB HYDRO-HYDRO 175 465 23300
RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 150 101 13400
SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 200 000 22500
KILLAR HPSEB HYDRO-HYDRO 030 050 22500
BHABA AUGUMENP H HPSEB HYDRO-HYDRO 450 1276 22500
BS CHAMBA HPSEB HYDRO-HYDRO 045 099 19500
GUMMA HPSEB HYDRO-HYDRO 300 423 22500
GAS TURBINE POWER STATION IPGCL THERMAL-GAS 27000 67233 39300
PPS-I PPCL THERMAL-GAS 33000 175905 38300
PPS-III PPCL THERMAL-GAS 137120 196879 36100
LOWER JHELUM JampKPDD HYDRO-HYDRO 10500 60214 5100
UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 2260 10514 6300
UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 10500 44202 8500
GANDHARBAL JampKPDD HYDRO-HYDRO 1500 8925 4700
KARNAH MPH JampKPDD HYDRO-HYDRO 200 1122 31000
CHENANI I JampKPDD HYDRO-HYDRO 2330 10892 6600
CHENANI II JampKPDD HYDRO-HYDRO 200 1188 9300
CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 750 3634 14200
IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 375 2108 18500
IGO MERCHELLONG JampKPDD HYDRO-HYDRO 300 1572 29700
PAHALGAM MHP JampKPDD HYDRO-HYDRO 450 1713 32900
MARPACHOO JampKPDD HYDRO-HYDRO 075 375 29800
HAFTAL JampKPDD HYDRO-HYDRO 100 483 28700
SANJAK JampKPDD HYDRO-HYDRO 126 441 36000
SEWA-III JampKPDD HYDRO-HYDRO 900 3273 20200
BHADERWAH JampKPDD HYDRO-HYDRO 150 935 8900
BAZGO JampKPDD HYDRO-HYDRO 030 108 33300
SUMOOR JampKPDD HYDRO-HYDRO 010 045 35400
HUNDER JampKPDD HYDRO-HYDRO 040 176 26200
STAKNA JampKPDD HYDRO-HYDRO 400 1933 4100
KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 124000 662879 31360
SURATGARH TPS RRVUNL THERMAL-COAL 150000 402328 41730
CHHABRA TPS 1amp 2 RRVUNL THERMAL-COAL 50000 305946 36700
CHHABRA TPS 3 RRVUNL THERMAL-COAL 25000 151536 36700
CHHABRA TPS 4 RRVUNL THERMAL-COAL 25000 155896 36700
RAMGARH GT POWER PROJECT RRVUNL THERMAL-COAL 22050 43177 41800
RAMGARH GAS T P PROJECT 3 RRVUNL THERMAL-GAS 5000 93615 41800
DHOLPUR C C POWER PROJECT RRVUNL THERMAL-R-LNG 33000 9486 46110
MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 14000 20855 34192
MINI MICRO HYDEL (MMH) P S RRVUNL HYDRO-HYDRO 2385 851 37800
KALISINDH TPP 1 RRVUNL THERMAL-COAL 60000 341543 45000
KALISINDH TPP 2 RRVUNL THERMAL-COAL 60000 211588 45000
KHARA HEP UPJVNL HYDRO-HYDRO 7200 26654 7200
MATATILLA HEP UPJVNL HYDRO-HYDRO 3060 12219 6500
OBRA HEP UPJVNL HYDRO-HYDRO 9900 21517 6300
RIHAND UPJVNL HYDRO-HYDRO 30000 57369 5500
ANPARA A TPS UPRVUNL THERMAL-COAL 63000 317536 27000
ANPARA B TPS UPRVUNL THERMAL-COAL 100000 705605 22700
ANPARA D UPRVUNL THERMAL-COAL 100000 300158 39800
HARDUAGANJ TPS UPRVUNL THERMAL-COAL 16500 45817 49200
HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 50000 304389 46600
OBRA A TPS UPRVUNL THERMAL-COAL 28800 13158 34000
OBRA B TPS UPRVUNL THERMAL-COAL 100000 328124 21900
Page 34
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) PANKI TPS UPRVUNL THERMAL-COAL 21000 66488 50300
PARICHHA TPS UPRVUNL THERMAL-COAL 22000 38762 49400
PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 42000 231931 45600
PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 50000 276722 50400
CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 24000 70845 8290
CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 14400 75366 8390
DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 3375 9595 12080
DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 5100 18701 10520
KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4140 17359 12330
KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 12000 33001 9420
KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 3000 11953 8320
TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 9000 33983 12460
MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 30400 124510 16110
RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 19800 17897 10550
MPUR UTTARAKHAND JVNL HYDRO-HYDRO 930 5121 19200
PATHRI UTTARAKHAND JVNL HYDRO-HYDRO 2040 11636 14200
GALOGI UTTARAKHAND JVNL HYDRO-HYDRO 300 648 12500
PRIVATE SECTOR
MGTPP CLP INDIA PVT LTD THERMAL-COAL 132000 268902 41940
SHRINAGAR HEP ALAKNANDA HPCL HYDRO-HYDRO 33000 127414 48800
GAMA INFRAPROP CCPP GAMA INFRAPROP PVT THERMAL-GAS 22500 52686 47000
PPGCL (BARA) JP POWER VENTURES LTD THERMAL-COAL 198000 448200 38500
MALANA HEP MALANA PCL HYDRO-HYDRO 8600 26354 29792
MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 10000 30369 32580
ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 19200 56347 36079
KASHANG HEP H P PCL HYDRO-HYDRO 19500 5034 29200
BASPA-II HEP HBPCL HYDRO-HYDRO 30000 132769 13600
KARCHAM WANGTOO HEP HBPCL HYDRO-HYDRO 100000 434386 36600
RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 108000 582600 43700
RITHALA COMBI CY POWER PLANT TATA POWER DDL THERMAL-GAS 9480 000 11900
RAJPURA TPS NABHA POWER LTD THERMAL-GAS 140000 901484 39000
TALWANDI SABO POWER LTD TALWANDI SABO POWER LTD THERMAL-COAL 198000 636040 49548
ROJA THERMAL POWER STATION ROJA POWER SCL THERMAL-COAL 120000 727200 43400
KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 34400 63400
BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 36000 62600
MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 38200 60800
UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 37900 61500
KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 42300 58800
LALITPUR PGCL BAJAJ ENERGY PVT LTD THERMAL-COAL 198000 359400 47300
PRAYAGRAJ PGCL PRAYAGRAJ PGCL THERMAL-COAL 132000 448200 38595
KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 132000 783182 33438
WESTERN REGION
CENTRAL SECTOR
INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 100000 325333 23892
OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 52000 141663 34001
GANDHAR CCPP NTPC LTD THERMAL-GAS 65739 221924 28700
KAWAS CCPP NTPC LTD THERMAL-GASN 65620 167929 27000
KORBA I amp II NTPC LTD THERMAL-COAL 210000 1499171 20500
KORBA III NTPC LTD THERMAL-COAL 50000 358746 26600
SIPAT STPS I NTPC LTD THERMAL-COAL 198000 1479902 26800
SIPAT STPS II NTPC LTD THERMAL-COAL 100000 766549 26500
VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 126000 693142 25800
VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 100000 608781 23800
VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 100000 673475 27600
VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 100000 655924 32900
VINDHYACHAL STPS V NTPC LTD THERMAL-COAL 50000 328265 31700
MOUDA I NTPC LTD THERMAL-COAL 100000 343130 44500
MOUDA Ii NTPC LTD THERMAL-COAL 66000 40637 39900
RATNAGIRI GAS amp POWER PVT LTD RGPPL THERMAL-GAS 196708 442485 47000
KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 000 24729
TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 32000 201227 10740
Page 35
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 365122 19069
TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 787444 29324
STATE SECTOR
GSEG-HAZIRA15610 MW GUJARAT S ENEGEN LTD THERMAL-GAS 15610 1805 28200
GSEG-HAZIRA35143 MW GUJARAT S ENEGEN LTD THERMAL-GAS 35130 22276 51300
GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 21978 51800
AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 13929 26100
KORBA TPS EAST CSPGCL THERMAL-COAL 44000 198673 33880
DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 365808 27570
KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 316500 30420
HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 532878 19410
CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 515 58300
MTTPS CHAMPA U-I CSPGCL THERMAL-COAL 50000 220376 39000
MTTPS CHAMPA U-II CSPGCL THERMAL-COAL 50000 23709 10000
SHP GANGREL CSPGCL HYDRO-HYDRO 1000 2350 36790
BANGO HEP CSPGCL HYDRO-HYDRO 12000 14662 8900
MHP KORBA WEST CSPGCL HYDRO-HYDRO 170 859 38190
SIKASAR HEP CSPGCL HYDRO-HYDRO 700 418 26870
DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8843 74500
DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 19446 51500
GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 66388 71600
GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127488 41300
KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 96072 43900
KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 29841 56400
SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 184966 58800
UKAI 1-5 GSECL THERMAL-COAL 85000 204891 46900
UKAI TPS 6 GSECL THERMAL-COAL 50000 284448 48200
WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 271999 58300
WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 82808 44100
KADANA HPS GSECL HYDRO-HYDRO 24200 34433 16800
UKAI HPS GSECL HYDRO-HYDRO 30500 40585 6100
TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 123000 11500
BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 8900 10900
BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 7200 27500
JHINNA HPS MPPGCL HYDRO-HYDRO 2000 9700 18500
RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 44300 3400
GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 17300 4600
SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 4100 16900
MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 14600 27000
PENCH HPS MPPGCL HYDRO-HYDRO 16000 23700 8100
RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 3000 16900
AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 134400 35100
SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 283800 38700
SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 344600 34300
SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 111600 61600
SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 211800 58000
SSTPS PH-I MPPGCL THERMAL-COAL 120000 233100 84300
BHUSAWAL TPS MSPGCL THERMAL-COAL 142000 566258 51100
CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1365682 33700
KHAPERKHEDA MSPGCL THERMAL-COAL 134000 706207 39100
KORADI TPS MSPGCL THERMAL-COAL 62000 443206 42000
NASIK TPS MSPGCL THERMAL-COAL 63000 297275 47000
PARLI TPS MSPGCL THERMAL-COAL 113000 175934 71600
PARAS MSPGCL THERMAL-COAL 50000 267931 38700
URAN CCPP MSPGCL THERMAL-GAS 67200 320330 30600
KOYANA MSPGCL HYDRO-HYDRO 195600 328155 13100
SMALL HYDRO POWER PLANTS MSPGCL HYDRO-HYDRO 45400 93062 30500
BHIRA MSPGCL HYDRO-HYDRO 8000 10046 8400
TILLARI MSPGCL HYDRO-HYDRO 8900 10584 3100
SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 233298 20500
SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 87633 20500
PRIVATE SECTOR
Page 36
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 81282 46750
JNSTPP(JAYPEE NIGRIE) JP POWER VENTURES LTD THERMAL-COAL 132000 726695 29310
MB POWER MB POWER THERMAL-COAL 120000 345632 38310
ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 754922 28671
ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 780761 23495
ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 198000 1263784 32090
ADANI POWER MAHARA ADANI POWER LTD THERMAL-COAL 330000 1666191 34124
AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 170065 36827
SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 252035 45129
ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 458551 36000
ESSAR POWER MP LTD ESSAR POWER MP LTD THERMAL-COAL 60000 243040 28600
VEDANTA LTD (P P -I) VEDANTA LTD THERMAL-GAS 3000 15044 24000
VEDANTA LTD (P P -II) VEDANTA LTD THERMAL-GAS 3000 21293 24000
PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 8234600 24000
165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 5850 64390
145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 68717 40349
SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 132655 28776
SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 144686 38567
MUNDRA UMPPCOASTAL GUJARAT POWER
LTD THERMAL-IMP COAL 400000 2530300
23900
LANCO AMARKANTAK TPP PATHADIH
U-ILANCO AMARKAN POWER LTD THERMAL-COAL 30000 195500
29200
LANCO AMARKANTAK TPP PATHADIH
U-IILANCO AMARKAN POWER LTD THERMAL-COAL 30000 206900
27600
BARADARHA TPS D B POWER LTD THERMAL-COAL 120000 677373 29200
JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 405000 28900
JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 453000 40500
DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 339437 40700
TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 293400 44000
TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 137200 37000
TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 174900 44000
BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 92900 14100
BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23700 34300
KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 27600 48300
CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2530300 23900
BHANDARDRA HEP -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 2475 54900
SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 161400 26500
SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 445000 39000
SOTHERN REGION
CENTRAL SECTOR
NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 325699 54820
NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 305532 39880
NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 998805 38510
NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 113016 54070
NEYVELI TAMILNADU POWER LTD JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 625274 42200
VALLUR TPS NTPC TECL THERMAL-COAL 150000 856438 42350
R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 1493 84300
RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1502919 29400
RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 341291 31800
SIMHADRI I NTPC LTD THERMAL-COAL 100000 688382 36800
SIMHADRI II NTPC LTD THERMAL-COAL 100000 663657 43400
KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 593110 31324
MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 291625 21764
KKNPP-1 amp 2 NPCIL NUCLEAR-NUCLEAR 200000 572609 40948
MINICOY LAKSHADEEP THERMAL-DIESEL 340 770 29600
KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1097 29600
AMINI LAKSHADEEP THERMAL-DIESEL 265 509 29600
ANDROTT LAKSHADEEP THERMAL-DIESEL 219 524 29600
KALPENI LAKSHADEEP THERMAL-DIESEL 175 356 29600
AGATTI LAKSHADEEP THERMAL-DIESEL 195 658 29600
KADMAT LAKSHADEEP THERMAL-DIESEL 190 414 29600
KILTAN LAKSHADEEP THERMAL-DIESEL 150 269 29600
CHETLET LAKSHADEEP THERMAL-DIESEL 100 139 29600
BITRA LAKSHADEEP THERMAL-DIESEL 043 024 29600
BANGARAM LAKSHADEEP THERMAL-DIESEL 018 009 29600
Page 37
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) STATE SECTOR
Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 721811 46500
Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 50000 336142 46500
RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 237358 46500
RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 239926 46500
RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 124500 46500
SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 62109 46500
UPPER SILERU APGENCO HYDRO-HYDRO 24000 33000 46500
LOWER SILERU APGENCO HYDRO-HYDRO 46000 81066 46500
DONKARAI APGENCO HYDRO-HYDRO 2500 6007 46500
PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 1262 46500
CHETTIPETA APGENCO HYDRO-HYDRO 100 214 46500
MUCHKUND APGENCO HYDRO-HYDRO 12000 37571 46500
NAGARJUNASAGAR RCPH APGENCO HYDRO-HYDRO 9000 606 46500
TUNGABHADRA HES amp HAMPI(AP
Share)
APGENCO HYDRO-HYDRO 7200 6100 46500
KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 352232 42600
KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 288131 32500
KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 319272 46500
RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 40073 44300
KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 308317 46000
KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 308963 51300
SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 61004 76600
NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 17960 75300
PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 20873 58300
POCHAMPAD-I TSPGENCO HYDRO-HYDRO 2700 5455 29800
POCHAMPAD-II TSPGENCO HYDRO-HYDRO 900 1932 40700
NIZAMSAGAR TSPGENCO HYDRO-HYDRO 1000 1126 53400
RAICHUR TPS 1 to 7 KPCL THERMAL-COAL 147000 890866 43800
RAICHUR TPS 8 KPCL THERMAL-COAL 25000 159523 48200
BELLARI TPS 1 KPCL THERMAL-COAL 50000 318679 51100
BELLARI TPS 2 KPCL THERMAL-COAL 50000 232347 55600
BELLARI TPS 3 KPCL THERMAL-COAL 70000 47565 34400
BHADRA PH KPCL HYDRO-HYDRO 3920 2369 45900
GERUSUPPA PH KPCL HYDRO-HYDRO 24000 26990 22000
GHAT PRABHA HEP KPCL HYDRO-HYDRO 3200 4777 25300
KADRA HPS KPCL HYDRO-HYDRO 15000 16889 26800
NAGJHARI KPCL HYDRO-HYDRO 90000 155159 9800
KODASALLI DPH KPCL HYDRO-HYDRO 12000 14854 19200
MUNIRA+MGH+SPH+SPH KPCL HYDRO-HYDRO 22640 48211 7900
SHARAVATHY HPS KPCL HYDRO-HYDRO 108550 276215 5400
ALMATTI DPH KPCL HYDRO-HYDRO 29000 39611 24600
VARAHI UGPH KPCL HYDRO-HYDRO 46000 71368 15600
IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 17196 15300
IDUKKI HPS KSEB HYDRO-HYDRO 78000 137905 15300
KAKKAD HPS KSEB HYDRO-HYDRO 5000 13063 15300
KALLADA HPS KSEB HYDRO-HYDRO 1500 4436 15300
KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 46544 15300
KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 635 15300
LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 30822 15300
MALANKARA HPS KSEB HYDRO-HYDRO 1050 2474 15300
MATTUPETTY KSEB HYDRO-HYDRO 200 230 15300
MALAMPUZHA KSEB HYDRO-HYDRO 250 063 15300
CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 864 15300
URUMI ST I amp II KSEB HYDRO-HYDRO 615 903 15300
LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 248 15300
NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7765 19625 15300
PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 16601 15300
PANNIAR HPS KSEB HYDRO-HYDRO 3240 6217 15300
PORINGALKUTHU KSEB HYDRO-HYDRO 3600 10052 15300
PORINGALKUTHU LBE KSEB HYDRO-HYDRO 1600 9438 15300
PEPPARA KSEB HYDRO-HYDRO 300 395 15300
POOZHITHODE KSEB HYDRO-HYDRO 480 1045 15300
Page 38
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) PEECHI KSEB HYDRO-HYDRO 125 040 15300
RANI-PERUNADU KSEB HYDRO-HYDRO 400 585 15300
SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 79783 15300
SENGULAM HPS KSEB HYDRO-HYDRO 5120 11558 15300
SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 16711 15300
VILANGAD KSEB HYDRO-HYDRO 750 1578 15300
BARAPOLE KSEB HYDRO-HYDRO 1500 1932 15300
VELLATHOOVAL KSEB HYDRO-HYDRO 360 305 15300
CHIM0NY KSEB HYDRO-HYDRO 250 156 15300
ADYANPARA KSEB HYDRO-HYDRO 350 501 15300
BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 554 15300
KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 3801 15300
KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 23132 32800
ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 14416 62280
METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 523970 62280
METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 321270 62280
NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 336575 62280
NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 591240 62280
TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 508966 62280
KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 30897 62280
VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 18720 90699 62280
KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 33593 62280
BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 1047 62280
PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 1250 62280
PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 330 62280
MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 4897 62280
MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 032 62280
KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15681 62280
KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 40608 62280
KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 21342 62280
KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 4717 62280
KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4322 62280
KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2399 62280
METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 4416 62280
METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 8035 62280
BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2187 62280
BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2359 62280
BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2511 62280
BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 1949 62280
BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 1819 62280
POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 172 62280
SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 241 62280
MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 026 62280
THIRUMOORTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 136 62280
PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 9309 62280
VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 353 62280
SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 4192 62280
PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 6571 62280
SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 1186 62280
SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6319 62280
ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 6122 62280
KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 28674 62280
SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 18381 62280
SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 4258 62280
KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 12680 62280
KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4201 62280
ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 000 62280
PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 19175 62280
AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 078 62280
BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 504 62280
BHAVANI KATTALAI (BKB)(IIIampIII BB I amp II)TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 5847 62280
PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 000 62280
Page 39
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) SRI DAMODARAM STPS APPDCL THERMAL-COAL 160000 808108 36300
PRIVATE SECTOR
KARUPPUR TANJORE LANCO TANJORE PCL THERMAL-GAS 12000 48096 28770
SIMHAPURI ENERGY LTD SIMHAPURI ENERGY LTD THERMAL-COAL 60000 143900 39100
JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 7111 45500
SBU 1 JSW ENERGY LTD
VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 26000 159100
43300
SBU 2 JSW ENERGY LTD
VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 60000 247900
42800
LANCO KPLLANCO KONDAPALLI POWER
LTDTHERMAL-GAS 36814 85060
25776
LANCO KPL STG -IILANCO KONDAPALLI POWER
LTDTHERMAL-GAS 36600 12979
46330
LANCO KPL STG -IIIALANCO KONDAPALLI POWER
LTDTHERMAL-GAS 37100 85710
46330
LANCO KPL STG -III BLANCO KONDAPALLI POWER
LTDTHERMAL-GAS 37100 43639
46330
HINDUJA NATIONAL PCL HINDUJA NATIONAL PCL THERMAL-COAL 104000 303000 38200
MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 121164 49940
UDUPI POWER COR LTD ADANI POWER LTD THERMAL-COAL 120000 754613 42500
SPECTRUM POWER GENERATION
LTD SPECTRUM PG LTD THERMAL-GASN 20525 9256812
34952
TAQA NEYVELI POWER COM PVT
LTD TAQA NEYVELI THERMAL-LIG 25000 5840
34500
ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 251000 51000
ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 207860 36800
GMR VEMAGIRI POWER GENERATION
LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 30117
46450
EASTERN REGION
CENTRAL SECTOR
MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 64675 53113
MTPS STAGE - II KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 39000 1432 69138
BOKARO `B` TPS DVC THERMAL-COAL 63000 145670 31539
MEJIA TPS U 1-3 DVC THERMAL-COAL 63000 348298 31552
MEJIA TPS U 4 DVC THERMAL-COAL 21000 116099 34997
MEJIA TPS U 5-6 DVC THERMAL-COAL 50000 276427 35976
MEJIA TPS U 7-8 DVC THERMAL-COAL 100000 552854 36991
DURGAPUR STEEL TPS DVC THERMAL-COAL 100000 665550 39323
DURGAPUR TPS DVC THERMAL-COAL 21000 59270 35416
RAGHUNATHPUR TPS DVC THERMAL-COAL 120000 201650 35326
MAITHON HYDEL STA DVC HYDRO-HYDRO 6320 12200 17984
CHANDRAPURA TPSU1-3 DVC THERMAL-COAL 42000 257610 35095
CHANDRAPURA TPSU7-8 DVC THERMAL-COAL 50000 306673 34987
KODERMA TPS DVC THERMAL-COAL 100000 380180 38131
PANCHET HPS DVC HYDRO-HYDRO 8000 13360 17984
TILLAYA HPS DVC HYDRO-HYDRO 400 1410 17984
RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34700 35400
TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 277300 23200
TLDP -III NHPC LTD HYDRO-HYDRO 13200 55400 62000
TLDP -IV NHPC LTD HYDRO-HYDRO 16000 60300 25600
FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 957219 33700
FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 308943 41000
BONGAINGAON TPS NTPC LTD THERMAL-COAL 25000 153663 58600
KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 542277 34200
KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 942591 34200
BARH-II NTPC LTD THERMAL-COAL 132000 728021 44500
TALCHER TPS NTPC LTD THERMAL-COAL 46000 335521 30100
TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 702319 25600
TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1436521 24700
STATE SECTOR
BTPS(RampM) BIHAR STATE PGCL THERMAL-COAL 22000 12142 39700
BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 98331 10602
HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 50593 9482
CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 19689 2605
RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 53192 6033
UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 147208 14637
Page 40
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 60353 4519
IB TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 288567 25000
J P H GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 210 038 61100
MEYONG CHU GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 400 1086 61100
TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 122667 38200
DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 214339 43321
KOLAGHAT THERMAL POWER
STATION
WEST BENGAL PDCL THERMAL-COAL 126000 538269 31603
BAKRESHWAR THERMAL POWER
PLANT
WEST BENGAL PDCL THERMAL-COAL 105000 634876 32154
BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 45000 166855 33299
SANTHALDIH THERMAL POWER
STATION
WEST BENGAL PDCL THERMAL-COAL 50000 336442 34932
SAGARDIGHI THERMAL POWER
PROJECT
WEST BENGAL PDCL THERMAL-COAL 160000 423121 34705
JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 20344 68900
RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 24559 68900
TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 4623 68900
PURULIA PUMPED STORAGE
PROJECT
WEST BENGAL SEDCL HYDRO-HYDRO 90000 108816 68900
MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2768 68900
PRIVATE SECTOR
CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 49474 20230
CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 555500 70200
HALDIA ENERGY HALDIA ENERGY LTD THERMAL-COAL 60000 371000 50400
DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3688 63400
KAMALANGA TPS GMR KAMALANGA ENERGY LTD THERMAL-COAL 105000547670
33300
ADHUNIK POWER U-1 ADHUNIK POWER THERMAL-COAL 27000 158 44060
ADHUNIK POWER U-2 ADHUNIK POWER THERMAL-COAL 27000 168 44250
VL-JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 332800 23622
JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 43000 45250
JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 71700 37030
JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 70700 35920
JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 71100 38870
JOJOBERA UNIT 5 TATA POWER COM LTD THERMAL-COAL 12000 79300 44560
JOJOBERA UNIT 6 TATA POWER COM LTD THERMAL-WHR 12000 83700 12840
IEL KALINGANAGAR U-I TATA POWER COM LTD THERMAL-WG 6750 33400 22500
IEL KALINGANAGAR U-II TATA POWER COM LTD THERMAL-WG 6750 34800 22500
MAITHON UNIT 1 amp 2 TATA POWER COM LTD THERMAL-COAL 105000 678000 36100
HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 27500 24340
HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 28400 24340
HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 15800 24310
NORTH EASTERN REGION
CENTRAL SECTOR
LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 74100 36600
AGARTALA GT NEEPCO THERMAL-GAS 13500 88611 27210
ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 153111 32310
DOYANG HEP NEEPCO HYDRO-HYDRO 7500 25598 49801
KOPILI HEP NEEPCO HYDRO-HYDRO 20000 98186 11491
KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 19582 20237
KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 10310 17968
RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 124093 22945
TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 10100 17344 39000
STATE SECTOR
HYDRO POWER (122 Stns) ITANAGAR GOVT OF ARUNACHAL
PRADESHHYDRO-HYDRO 6971 6217270
24600
KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39514 17337
LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 82327 36810
NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 33318 48290
MYNTRIANG SHEP ST II ASSAM POWER GENCO HYDRO-HYDRO 300 567 35776
LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 9130 49200
LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 012 49200
DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 022 49200
TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 000 49200
UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 4990 16000
UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 6476 37000
UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 16494 14600
UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 3600 9556 15000
SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 758 8000
MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44070 44800
KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 154 41400
TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 091 41400
MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 411 41400
MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 394 41400
KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 760 41400
SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 3264 41400
LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 044 41400
BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 18953 28000
ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 43585 28200
GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 4080 11100
Note
LIG Lignite N Naptha WHR Waste Heat Recovery
Page 41
Sector
Coal Lignite Gas Diesel Total
State 6407650 129000 711871 36393 7284913 000 2987880 234793 10507586
Private 7468800 183000 1058060 27370 8737230 000 339400 7366140 16442770
Central 5568000 314000 723791 000 6605791 678000 1212642 163230 8659663
All India 19444450 626000 2493722 63763 22627934 678000 4539922 7764163 35610019
State 10507586
Private 16442770
Central 8659663
Electricity Generation (MU) Targets and Achievements for 2016-17
5 All India Installed Capacity (MW) Sector-wise as on 30-04-19
4
Grand TotalTHERMAL
Nuclear Hydro RES
RES as on 31032019
State 10507586 30
Private 16442770 46
Central 8659663 24
All India Installed Capacity(MW) (Sector-Wise)
Voltage Level
+- 500 KV HVDC
+- 800 KV HVDC
765 KV
400 KV
220 KV
All India
Voltage Level
+- 500 KV HVDC
+- 800 KV HVDC
765 KV
400 kV
220 KV
All India
5
481 401
763 474
0 0
242 53
40 20
0 0
242 53
40 20
481 401
763 474
Transmission Lines Added duringApr-18 to Apr-18 ampApr-19 to Apr-19 (Ckms)
Apr-18 to Apr-18 Apr-19 to Apr-19
0 0
6 Transmission Lines Added during Apr-2019 (Ckms)
Apr-18 Apr-19
0 0
763
474
0
100
200
300
400
500
600
700
800
900
All India
Ckm
s
Apr-18 Apr-19
763
474
0
100
200
300
400
500
600
700
800
900
All India
Ckm
s
Apr-18 to Apr-18 Apr-19 to Apr-19
Voltage Level
+- 800 KV HVDC
+- 500 KV HVDC
765 KV
400 KV
220 KV
All India
Voltage Level
+- 800 KV HVDC
+- 500 KV HVDC
765 KV
400 KV
220 KV
All India
6
0 0
All India Transformation Capacity Addition during Apr-18 to Apr-18 amp Apr-19
to Apr-19 (MVA)
4600
0
500
2795
1305
5470
4000
185
1285
0
Apr-18 to Apr-18 Apr-19 to Apr-19
5470
0
500
4600
2795
1305
7 Transformation Capacity Addition During Apr-2019 (MVA)
0
4000
185
1285
0 0
Apr-18 Apr-19
5470
4600
4000
4200
4400
4600
4800
5000
5200
5400
5600
MV
A
Apr-18 Apr-19
5470 4600
0
74520
1
MV
A
Apr-18 to Apr-18 Apr-19 to Apr-19
Apr-2018 Apr-2019 Apr-2018 Apr-2019 Apr-2018 Apr-2019
Northern 28590 30094 28170 29786 -15 -10
Western 33235 34875 33233 34868 00 00
Southern 29211 31111 29166 31109 -02 00
Eastern 11752 12851 11650 12850 -09 00
North Eastern 1225 1300 1174 1228 -42 -55
All India 104013 110231 103393 109842 -06 -04
Apr-2018 Apr-2019 Apr-2018 Apr-2019 Apr-2018 Apr-2019
Northern 48824 54476 48367 53985 -09 -09
Western 50654 56242 50434 56222 -04 00
Southern 45946 49155 45684 49103 -06 -01
Eastern 21320 23349 21275 23349 -02 00
North Eastern 2600 2848 2552 2780 -18 -24
All India 162492 177411 161286 176810 -07 -03
Apr-2019 Figures are Provisional
7
8 Power Supply Position (Energy amp Peak) in Apr-2019
Peak Demand Peak Met
Requirement Availability
Energy (MU)Region
Surplus(+)
Deficit (-) in
Surplus(+)
Deficit (-) in Region
Power (MW)
Chandigarh Delhi Haryana HP JampK Punjab Rajasthan UP Utrakhand Apr-2018 0 0 0 0 546 0 0 247 0
Apr-2019 0 0 0 0 565 0 0 0 0
Chattisgarh Gujarat MP Maharashtra Daman amp Diu Dadar Nagar Goa
Apr-2018 13 11 3 99 0 0 0
Apr-2019 22 6 0 8 1 0 0
AP Telangana Karnataka Kerala Tamil Nadu Puducherry Lakshadweep
Apr-2018 22 0 2 0 0 20 0
Apr-2019 0 0 0 8 0 2 0
8
9 Peak Shortage of Power Supply (MW) in Different Regions in Apr-2019
0 0 0 0
565
0 0 0 00 0 0 0
546
0 0
247
0
0
400
800
Ch
an
dig
ar
h Delh
i
Ha
rya
na
HP
Jamp
K
Pu
nja
b
Ra
jasth
an
UP
Utr
akhan
d
MW
Northern States (MW) Apr-2019 Apr-2018
22
6 0 8 1 0 0
13
11
3
99
0 0 0
0
50
100
150
Ch
attis
gar
h
Guja
rat
MP
Mah
ara
shtr
a
Da
man amp
Diu
Da
dar
Na
gar G
oa
MW
Western States (MW) Apr-2019 Apr-2018
0 0 08
0 2 0
22
0 2 0 0
20
00
50
AP Telangana Karnataka Kerala Tamil Nadu Puducherry Lakshadweep
Southern State (MW) Apr-2019 Apr-2018
Bihar DVC Jharkhand Odisha West Bengal Sikkim AampN Island
Apr-2018 0 39 0 0 7 0 4
Apr-2019 0 0 0 0 0 0 4
Arunachal Assam Manipur Meghalaya Mizoram Nagaland Tripura
Apr-2018 5 30 7 0 9 29 4
Apr-2019 3 45 9 0 3 26 1
9
0 0 0 0 0 0
4
0
39
0 0
7
0
4
01020304050
Bih
ar
DV
C
Jha
rkh
an
d
Od
ish
a
We
st
Be
ng
al
Sik
kim
Aamp
NIs
land
MW
Eastern States (MW) Apr-2019 Apr-2018
3
45
9
0 3
26
1
5 7
0
9
29
4
0
10
20
30
40
50
Aru
na
cha
l
Assa
m
Ma
nip
ur
Me
gh
ala
ya
Miz
ora
m
Na
gala
nd
Trip
ura
MW
North-Eastern States (MW)
Sector Apr-2018 Apr-2019
Central 7634 7459
State 6438 6142
Private Sector IPP 5525 6005
Private Sector UTL 6815 6440
ALL INDIA 6454 6471
Month PLF 2018 PLF 2019
Jan 6215 6054
Feb 6230 6051
March 6452 6340
April 6454 6471
For Coal and Lignite based Power Plants and Provisional based on Actual-Cum-Assesment
10
PLF of Thermal Power Plants
(excluding gas based power plants)
All India PLF of Thermal Plants (Excluding Gas Based Plants) Month-wise
10 All India Thermal PLF Sector-wise (Excluding Gas Based Power Plants) for Apr-2019
5800
6000
6200
6400
6600
Jan Feb March April
Months
All India PLF Month-wise
PLF 2018 PLF 2019
7634
64385525
6815 6454
7459
6142 60056440 6471
000
2000
4000
6000
8000
10000
Central State Private Sector IPP Private Sector UTL ALL INDIA
All India Thermal PLF
Apr-2018 Apr-2019
2012-13 2013-14 2014-15 2015-16 2016-17 2017-18
TampD Losses 2304 2284 2277 2181 2142 2104
ATampC Losses 2548 2262 2572 2398 NA NA
Provisional
Note As per PFC for utilities selling directly to consumers NA- Not Available
Total Number of Villages
597464
Note From the year 2004-05 onwards Definition of Village Electrification-
A village would be declared Electrified if
Without
Subsidy
Gap ACS-
ARR(
Without
Subsidy)
Paiseunit
Gap ACS-
ARR (on
subsidy
booked
basis)
paiseunit
Gap ACS-
ARR (on
subsidyrece
ived basis)
paiseunit
2013-14 400 118 76 77
2014-15 412 108 58 60
Source- PFC Reports on the performance of State Power Utilities
2013-14 4894
2014-15 5304
2015-16 5459
2016-17 5743
2017-18 6080
2018-19 6289
11
11 T amp D and ATampC Losses ()
12 All India Village Electrification
Villiages Electrified (Nos)
10000All villages as per census 2011 has
been electrified on 28042018
Villages electrified
Average cost of supply(ACS)
(paiseunit)
i) Basic Infrastructure such as Distribution Transformer and Distribution lines are provided in the inhabited locality
as well as Dalit Basti hemlet where it exists (For electrification through Non-Conventional Energy Sources a
Distribution Transformer may not be necessary)
14 All India Coal consumption for Power Generation (MT)
520
Average Revenue Realization(paiseunit)
518
Year
ii) Electricity is provided to Public places like Schools Panchayat Office Health Centre Dispensaries Community
Centres etc and
iv) Mandatory Certification from Gram Panchayat regarding the completion of village electrification should be
obtained
13 Average cost of Power amp Average Realisation
iii) The number of households electrified should be at least 10 of the total number of households in the village
SN Contents Page
1 Capacity Addition Targets and Achievements in 12th Plan amp upto March2019 12
2 Capacity Addition Targets amp Achievements during Apr-2019 and Apr-19 to Apr-19 13
3 Installed Capacity in various Regions including their shares 14-19
Section B - Capacity Addition
(i) CAPACITY ADDTION TARGETS AND ACHIEVEMENTS IN THE 12TH PLAN Figures in MW
TARGET ACH TARGET ACH TARGET ACH TARGET ACH
CENTRAL 14878 15869 6004 2584 5300 2000 26182 20453
STATE 13922 22201 1608 2276 0 0 15530 24477
PRIVATE 43540 53661 3285 619 0 0 46825 54280
ALL INDIA 72340 91730 10897 5479 5300 2000 88537 99209
(ii) CAPACITY ADDITION TARGET AND ACHIEVEMENT FOR 2017-18 (IN MW)
THERMAL HYDRO NUCLEAR
TARGET ACH TARGET ACH TARGET ACH TARGET ACH
CENTRAL 4880 3170 800 390 500 6180 3560
STATE 3546 1760 300 200 0 3846 1960
PRIVATE 2940 3780 205 205 0 3145 3985
ALL INDIA 11366 8710 1305 795 500 0 13171 9505
(iii) CAPACITY ADDITION ACHIEVEMENT FOR 2018-19 (IN MW)
TARGET ACH TARGET ACH TARGET ACH TARGET ACH
CENTRAL 2760 1960 710 110 0 0 3470 2070
STATE 4506 2850 130 30 0 0 4636 2880
PRIVATE 0 972 0 0 0 0 0 972
ALL INDIA 7266 5782 840 140 0 0 8106 5922
12
SECTOR
SECTOR
TOTAL
TOTALNUCLEARHYDROTHERMAL
1 Capacity Addtion Targets and Achievements in the 12th Plan amp upto March2019
SECTORTHERMAL HYDRO NUCLEAR TOTAL
(MW)
Cummulative
Deviation
Target Achievement Target Achievement (+) (-)
Central 6040 500 0 500 0 -500
State 425615 660 0 660 0 -660
Private 0 0 0 0 0 0
Total 1029615 1160 0 1160 0 -1160
Central 600 0 0 0 0 0
State 21099 0 0 0 0 0
Private 379 0 0 0 0 0
Total 118999 0 0 0 0 0
Nuclear Central 700 0 0 0 0 0
Central 7340 500 0 500 0 -500
State 446714 660 0 660 0 -660
Private 379 0 0 0 0 0
Total 1218614 1160 0 1160 0 -1160
Electricity Generation (MU) Targets and Achievements for 2016-17
13
Hydro
All India
Capacity Addition TargetsAchievements during the Month of Apr-2019
Thermal
2 Capacity Addition Targets Achievements During Apr-2019
Schemes Sector
Target 2019-20
Apr-19 to Apr-19Apr-19
11
60
0 0
11
60
0 0 0 0
0
200
400
600
800
1000
1200
1400
Thermal Hydro Nuclear Total
MW
Targets and Achievement during 2019-20Target Achievement
0
200
400
600
800
1000
1200
Thermal Hydro Nuclear Total
1160
0 0
1160
0 0 00
MW
Target Achievement
Coal Lignite Gas Diesel Total
State 1634400 25000 287920 000 1947320 000 869755 69956 2887031
Private 2168083 108000 55800 000 2331883 000 251400 1312046 3895329
Central 1233537 25000 234406 000 1492943 162000 849622 37900 2542465
Sub Total 5036020 158000 578126 000 5772146 162000 1970777 1419902 9324825
State 2156000 104000 284982 000 2544982 000 544650 54789 3144421
Private 3474567 50000 467600 000 3992167 000 48100 2186476 6226743
Central 1650295 000 328067 000 1978362 184000 162000 66630 2390992
Sub Total 7280862 154000 1080649 000 8515511 184000 754750 2307894 11762155
State 1993250 000 79198 28788 2101236 000 1177483 58688 3337407
Private 1187450 25000 532210 27370 1772030 000 000 3749140 5521170
Central 1123502 289000 35958 000 1448460 332000 000 54190 1834650
Sub Total 4304202 314000 647366 56158 5321726 332000 1177483 3862018 10693227
State 624000 000 10000 000 634000 000 353792 27511 1015303
Private 638700 000 000 000 638700 000 39900 111637 790237
Central 1483664 000 000 000 1483664 000 100520 1000 1585184
Sub Total 2746364 000 10000 000 2756364 000 494212 140148 3390724
State 000 000 49771 3600 53371 000 42200 23325 118895
Private 000 000 2450 000 2450 000 000 6104 8554
Central 77002 000 125360 000 202362 000 100500 3000 305862
Sub Total 77002 000 177581 3600 258183 000 142700 32429 433311
State 000 000 000 4005 4005 000 000 525 4530
Private 000 000 000 000 000 000 000 738 738
Central 000 000 000 000 000 000 000 510 510
Sub Total 000 000 000 4005 4005 000 000 1773 5778
State 6407650 129000 711871 36393 7284913 000 2987880 234793 10507586
Private 7468800 183000 1058060 27370 8737230 000 339400 7366140 16442770
Central 5568000 314000 723791 000 6605791 678000 1212642 163230 8659663
Total 19444450 626000 2493722 63763 22627934 678000 4539922 7764163 35610019
Figures at decimal may not tally due to rounding off
Note -
(As per latest information available with MNRE)
Break up of RES all India as on 31032019 is given below (in MW)
459315 3562597 2818071 7764163
A 0 MW
B Apr 2019 0 MW
C
Apr 2019 0 MW
D Net Capacity Added during Apr 2019 A-B-C 0 MW
Sector wise breakup of RES capacity as shown is provisional
Share of installed capacity of BBMB Stations is included in state sector of partner states
BM PowerCogen Waste to Energy
910350 13830
Capacity Added during Apr 2019
Capacity Retired during
Capacity removed due to change
from Conventional to RES during
Islands
ALL INDIA
Abbreviation- SHP=Small Hydro Project (le 25 MW) BP=Biomass Power UampI=Urban amp Industrial Waste Power RES=Renewable Energy Sources
1 RES include SHP BP UampI Solar and Wind Energy Installed capacity in respect of RES (MNRE) as on 31032019
Small
Hydro PowerWind Power
Bio-PowerSolar Power
Total
Capacity
RES
(MNRE)
Northern Region
Western Region
Southern Region
Eastern Region
North Eastern
Region
ALL INDIA INSTALLED CAPACITY (IN MW) OF POWER STATIONS
(As on 30042019)
(UTILITIES)
Region Ownership Sector
Mode wise breakup
Grand TotalThermalNuclear Hydro
Coal Lignite Gas Diesel Total
State 13500 000 180040 000 193540 000 000 000 193540
Private 86922 000 10800 000 97722 000 000 17889 115611
Central 311272 000 20701 000 331973 10283 72309 000 414565
Sub-Total 411694 000 211541 000 623235 10283 72309 17889 723716
State 272000 000 15000 000 287000 000 110282 6930 404212
Private 408078 000 000 000 408078 000 20000 34512 462590
Central 129472 000 53561 000 183034 10094 66370181 500 259998
Sub-Total 809550 000 68561 000 878112 10094 196652 41942 1126799
State 000 000 000 000 000 000 69460 25661 95121
Private 000 000 000 000 000 000 99200 62668 161868
Central 18340 000 6201 000 24541 2895 122388 000 149824
Sub-Total 18340 000 6201 000 24541 2895 291048 88329 406813
State 000 000 17500 000 17500 000 123000 12903 153403
Private 000 000 000 000 000 000 000 6483 6483
Central 50639 000 12907 000 63547 6798 109188 000 179533
Sub-Total 50639 000 30407 000 81047 6798 232188 19386 339419
State 176000 000 15000 000 191000 000 259770 12780 463550
Private 511550 000 000 000 511550 000 28800 115462 655812
Central 85458 000 26401 000 111859 19681 92342 000 223882
Sub-Total 773008 000 41401 000 814409 19681 380912 128242 1343244
State 626000 25000 60380 000 711380 000 109618 2385 823383
Private 280200 108000 000 000 388200 000 10400 730181 1128781
Central 95625 25000 22110 000 142735 55674 73901 34400 306710
Sub-Total 1001825 158000 82490 000 1242315 55674 193919 766966 2258874
State 546900 000 000 000 546900 000 72410 2510 621820
Private 871433 000 000 000 871433 000 84200 288760 1244393
Central 379639 000 54949 000 434588 28948 180253 3000 646789
Sub-Total 1797972 000 54949 000 1852921 28948 336863 294270 2513002
State 000 000 000 000 000 000 125215 6787 132002
Private 9900 000 45000 000 54900 000 8800 52620 116320
Central 34324 000 6966 000 41290 3124 47554 000 91968
Sub-Total 44224 000 51966 000 96190 3124 181569 59407 340290
State 000 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 000 3471 3471
Central 3815 000 1503 000 5317 801 10171 000 16289
Sub-Total 3815 000 1503 000 5317 801 10171 3471 19760
124953 000 29105 000 154058 23703 75145 000 252907
State 1634400 25000 287920 000 1947320 000 869755 69956 2887031
Private 2168083 108000 55800 000 2331883 000 251400 1312046 3895329
Central 1233537 25000 234406 000 1492943 162000 849622 37900 2542465
Grand Total 5036020 158000 578126 000 5772146 162000 1970777 1419902 9324825
Delhi
Haryana
Himachal Pradesh
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
NORTHERN REGION
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
(As on 30042019)
State Ownership Sector
Mode wise breakup
Grand TotalThermalNuclear Hydro
RES
(MNRE)
Jammu amp Kashmir
Punjab
Rajasthan
Uttar Pradesh
Uttarakhand
Chandigarh
Central - Unallocated
Total (Northern
Region)
(As on 30042019)
Coal Lignite Gas Diesel Total
State 000 000 000 000 000 000 000 005 005
Private 000 000 4800 000 4800 000 000 392 5192
Central 46959 000 1967 000 48926 2600 000 000 51526
Sub-Total 46959 000 6767 000 53726 2600 000 397 56723
State 000 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 000 1447 1447
Central 14141 000 4334 000 18475 700 000 000 19175
Sub-Total 14141 000 4334 000 18475 700 000 1447 20622
State 371000 104000 217782 000 692782 000 77200 6470 776452
Private 726567 50000 396000 000 1172567 000 000 833180 2005747
Central 324243 000 42400 000 366643 55900 000 24330 446873
Sub-Total 1421810 154000 656182 000 2231992 55900 77200 863980 3229072
State 540000 000 000 000 540000 000 170366 8396 718762
Private 617400 000 10000 000 627400 000 000 418040 1045440
Central 334238 000 25700 000 359938 27300 152000 30000 569238
Sub-Total 1491638 000 35700 000 1527338 27300 322366 456436 2333440
State 228000 000 000 000 228000 000 12000 1105 241105
Private 885000 000 000 000 885000 000 000 52430 937430
Central 211075 000 000 000 211075 4800 10000 000 225875
Sub-Total 1324075 000 000 000 1324075 4800 22000 53535 1404410
State 1017000 000 67200 000 1084200 000 285084 38813 1408097
Private 1245600 000 56800 000 1302400 000 48100 880441 2230941
Central 466780 000 227273 000 694053 69000 000 12300 775353
Sub-Total 2729380 000 351273 000 3080653 69000 333184 931553 4414390
State 000 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 000 546 546
Central 19560 000 6634 000 26194 900 000 000 27094
Sub-Total 19560 000 6634 000 26194 900 000 546 27640
233300 000 19759 000 253059 22800 000 000 275859
State 2156000 104000 284982 000 2544982 000 544650 54789 3144421
Private 3474567 50000 467600 000 3992167 000 48100 2186476 6226743
Central 1650295 000 328067 000 1978362 184000 162000 66630 2390992
Grand Total 7280862 154000 1080649 000 8515511 184000 754750 2307894 11762155
Goa
Daman amp Diu
Gujarat
Madhya Pradesh
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
WESTERN REGION
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
ThermalNuclear Hydro
RES
(MNRE)
State Ownership Sector
Mode wise breakup
Grand Total
Chhattisgarh
Maharashtra
Dadra amp Nagar
Naveli
Central - Unallocated
Total (Western
Region)
(As on 30042019)
Coal Lignite Gas Diesel Total
State 501000 000 23540 000 524540 000 167360 5618 697518
Private 387388 000 381318 3680 772386 000 000 743342 1515728
Central 154683 12773 000 000 167456 12727 000 25000 205183
Sub-Total 1043071 12773 404858 3680 1464382 12727 167360 773960 2418429
State 558250 000 000 000 558250 000 247993 4122 810365
Private 83945 000 83182 000 167127 000 000 393644 560771
Central 180685 14927 000 000 195612 14873 000 1000 211485
Sub-Total 822880 14927 83182 000 920989 14873 247993 398766 1582621
State 502000 000 000 12792 514792 000 358660 19389 892841
Private 195850 000 000 2520 198370 000 000 1363591 1561961
Central 242780 40140 000 000 282920 69800 000 000 352720
Sub-Total 940630 40140 000 15312 996082 69800 358660 1382979 2807521
State 000 000 000 15996 15996 000 185650 17290 218936
Private 61500 000 17400 000 78900 000 000 19021 97921
Central 86142 28180 35958 000 150280 36200 000 5000 191480
Sub-Total 147642 28180 53358 15996 245176 36200 185650 41311 508337
State 432000 000 52408 000 484408 000 217820 12270 714498
Private 458767 25000 50310 21170 555247 000 000 1229228 1784475
Central 302532 136420 000 000 438952 144800 000 23190 606942
Sub-Total 1193299 161420 102718 21170 1478607 144800 217820 1264688 3105915
State 000 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 000 000 000
Central 000 10000 000 000 10000 000 000 000 10000
Sub-Total 000 10000 000 000 10000 000 000 000 10000
State 000 000 3250 000 3250 000 000 000 3250
Private 000 000 000 000 000 000 000 314 314
Central 14080 10760 000 000 24840 8600 000 000 33440
Sub-Total 14080 10760 3250 000 28090 8600 000 314 37004
142600 35800 000 000 178400 45000 000 000 223400
State 1993250 000 79198 28788 2101236 000 1177483 58688 3337407
Private 1187450 25000 532210 27370 1772030 000 000 3749140 5521170
Central 1123502 289000 35958 000 1448460 332000 000 54190 1834650
Grand Total 4304202 314000 647366 56158 5321726 332000 1177483 3862018 10693227
Kerala
Andhra Pradesh
Telangana
Karnataka
Total (Southern
Region)
Tamil Nadu
NLC
Puducherry
Central - Unallocated
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
SOUTHERN REGION
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
State Ownership Sector
Mode wise breakup
Grand TotalThermalNuclear Hydro
RES
(MNRE)
(As on 30042019)
Coal Lignite Gas Diesel Total
State 000 000 000 000 000 000 000 7070 7070
Private 28100 000 000 000 28100 000 000 25545 53645
Central 384933 000 000 000 384933 000 11000 000 395932
Sub-Total 413033 000 000 000 413033 000 11000 32615 456647
State 42000 000 000 000 42000 000 13000 405 55405
Private 73000 000 000 000 73000 000 000 3495 76495
Central 39374 000 000 000 39374 000 6100 000 45474
Sub-Total 154374 000 000 000 154374 000 19100 3900 177374
State 540000 000 10000 000 550000 000 98600 12195 660795
Private 243700 000 000 000 243700 000 000 35250 278950
Central 76077 000 000 000 76077 000 41000 000 117077
Sub-Total 859777 000 10000 000 869777 000 139600 47445 1056822
State 000 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 000 000 000
Central 698504 000 000 000 698504 000 18620 000 717124
Sub-Total 698504 000 000 000 698504 000 18620 000 717124
State 42000 000 000 000 42000 000 206192 2630 250822
Private 293900 000 000 000 293900 000 000 47346 341246
Central 163390 000 000 000 163390 000 8900 1000 173290
Sub-Total 499290 000 000 000 499290 000 215092 50976 765358
State 000 000 000 000 000 000 36000 5211 41211
Private 000 000 000 000 000 000 39900 001 39901
Central 8703 000 000 000 8703 000 6400 000 15103
Sub-Total 8703 000 000 000 8703 000 82300 5212 96215
112683 000 000 000 112683 000 8501 000 121184
State 624000 000 10000 000 634000 000 353792 27511 1015303
Private 638700 000 000 000 638700 000 39900 111637 790237
Central 1483664 000 000 000 1483664 000 100520 1000 1585184
Grand Total 2746364 000 10000 000 2756364 000 494212 140148 3390724
Total (Eastern
Region)
Bihar
Jharkhand
West Bengal
DVC
Odisha
Sikkim
Central - Unallocated
HydroOwnership Sector
Mode wise breakup
Grand TotalThermalNuclear
RES
(MNRE)
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
State
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
EASTERN REGION
(As on 30042019)
Coal Lignite Gas Diesel Total
State 000 000 32821 000 32821 000 10000 501 43322
Private 000 000 2450 000 2450 000 000 2650 5100
Central 40852 000 43556 000 84408 000 35708 2500 122616
Sub-Total 40852 000 78827 000 119679 000 45708 5651 171038
State 000 000 000 000 000 000 000 10711 10711
Private 000 000 000 000 000 000 000 2939 2939
Central 3705 000 4682 000 8387 000 11655 000 20042
Sub-Total 3705 000 4682 000 8387 000 11655 13650 33692
State 000 000 000 000 000 000 32200 3253 35453
Private 000 000 000 000 000 000 000 012 012
Central 4560 000 10969 000 15529 000 7227 000 22756
Sub-Total 4560 000 10969 000 15529 000 39427 3265 58221
State 000 000 16950 000 16950 000 000 1601 18551
Private 000 000 000 000 000 000 000 009 009
Central 5610 000 43695 000 49305 000 6849 500 56654
Sub-Total 5610 000 60645 000 66255 000 6849 2110 75214
State 000 000 000 3600 3600 000 000 545 4145
Private 000 000 000 000 000 000 000 344 344
Central 4710 000 7157 000 11867 000 9534 000 21401
Sub-Total 4710 000 7157 3600 15467 000 9534 889 25890
State 000 000 000 000 000 000 000 3067 3067
Private 000 000 000 000 000 000 000 100 100
Central 3210 000 4893 000 8103 000 5733 000 13836
Sub-Total 3210 000 4893 000 8103 000 5733 3167 17003
State 000 000 000 000 000 000 000 3647 3647
Private 000 000 000 000 000 000 000 050 050
Central 3105 000 4046 000 7151 000 9794 000 16945
Sub-Total 3105 000 4046 000 7151 000 9794 3697 20642
11250 000 6362 000 17612 000 14000 000 31612
State 000 000 49771 3600 53371 000 42200 23325 118895
Private 000 000 2450 000 2450 000 000 6104 8554
Central 77002 000 125360 000 202362 000 100500 3000 305862
Grand Total 77002 000 177581 3600 258183 000 142700 32429 433311
Assam
Arunachal Pradesh
Meghalaya
Tripura
Manipur
Nagaland
Mizoram
Central - Unallocated
Total (North-
Eastern Region)
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
NORTH-EASTERN REGION
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
State Ownership Sector
Mode wise breakup
Grand TotalThermalNuclear Hydro
RES
(MNRE)
(As on 30042019)
Coal Lignite Gas Diesel Total
State 000 000 000 4005 4005 000 000 525 4530
Private 000 000 000 000 000 000 000 663 663
Central 000 000 000 000 000 000 000 510 510
Sub-Total 000 000 000 4005 4005 000 000 1698 5703
State 000 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 000 075 075
Central 000 000 000 000 000 000 000 000 000
Sub-Total 000 000 000 000 000 000 000 075 075
State 000 000 000 4005 4005 000 000 525 4530
Private 000 000 000 000 000 000 000 738 738
Central 000 000 000 000 000 000 000 510 510
Grand Total 000 000 000 4005 4005 000 000 1773 5778
Andaman amp
Nicobar
Lakshadweep
Total (Islands)
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
ISLANDS
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
State Ownership Sector
Mode wise breakup
Grand TotalThermalNuclear Hydro
RES
(MNRE)
SrNo Contents Page
1 Executive summary of Target and Achievement of Transmission Lines during 2019-20
20(1)
2 List of Transmission Lines CommissionedReady for commissioning during Apr-2019 20(2)
Section C - Transmission Lines
1 Executive summary of Target and Achievement of Transmission Lines during 2019-20 As on 30-04-19
(All figures in circuit kms)
Ce
ntr
al S
ecto
r
Sta
te S
ecto
r
JV
Pri
va
te S
ecto
r
To
tal
Ce
ntr
al S
ecto
r
Sta
te S
ecto
r
JV
Pri
va
te S
ecto
r
To
tal
Ce
ntr
al S
ecto
r
Sta
te S
ecto
r
JV
Pri
va
te S
ecto
r
To
tal
Ce
ntr
al S
ecto
r
Sta
te S
ecto
r
JV
Pri
va
te S
ecto
r
To
tal
Ce
ntr
al S
ecto
r
Sta
te S
ecto
r
JV
Pri
va
te S
ecto
r
To
tal
Ce
ntr
al
Se
cto
r
Sta
te S
ec
tor
JV
Pri
va
te S
ec
tor
Gra
nd
To
tal
0 0 0 0 0 0 0 0 2727 958 2334 6019 2239 3416 1143 6798 781 10023 0 10804 5747 14397 3477 23621
Apr19 Programme 0 0 0 0 0 0 0 0 577 416 557 1550 60 890 203 1153 0 309 0 309 637 1615 760 3012
Achievement 0 0 0 0 0 0 0 0 53 0 0 53 0 20 0 20 0 401 0 401 53 421 0 474
Upto Apr-19 Programme 0 0 0 0 0 0 0 0 577 416 557 1550 60 890 203 1153 0 309 0 309 637 1615 760 3012
Achievement 0 0 0 0 0 0 0 0 53 0 0 53 0 20 0 20 0 401 0 401 53 421 0 474
20(1)
220 kV Grand Total 800 kV 500 kV
Programme 2019-20
Programme
Achievement
HVDC765 kV 400 kV
Line
1 2 3 4 5 6
1 400 Bhadla (PG) - Bhadla (RVPN) line DC PGCIL 53
53
2 400 LILO of one ckt Jhanor - Navsari at Vav Ss DC GETCO 20
3 220 Banda-Chitrakoot Line DC UPPTCL 226
4 220 Gorakhpur (PG)-Gola line DC UPPTCL 82
5 220 Hapur(765) - Faridnagar line SC UPPTCL 11
6 220 Kalikiri - Madanapalli line DC APTRANSCO 60
7 220LILO of Gr Noida -Noida Sec-129 at Noida
Sec-148DC UPPTCL 1
8 220LILO of one Ckt of Badshahpur Pali at Sec-
65 GurgaonDC HVPNL 3
9 220 Sultanpur-Sangipur LILO Section at Amethi DC UPPTCL 18
421
0
474
20(2)
Grand Total
2Transmission Lines (220 kV and above) CommissionedReady for commissioning During Apr-2019
Voltage
Level (kV)Name of Transmission Lines
Circuit
Type
Executing
Agency
CENTRAL SECTOR
Total of CENTRAL SECTOR
STATE SECTOR Sector
Total of STATE SECTOR
PRIVATE SECTOR
Total of PRIVATE SECTOR
SlNo
Length(CKm)
As on 30-04-19
SN Contents Page
1 Executive summary of Target and Achievement of Substations during 2019-20 21(1)
2Sub Stations (220 kV and above) commissionedready for commisssioning during Apr-
201921(2)
Section D - Sub Stations
1 Executive summary of Target and Achievement of Substations during 2019-2020 As on 30-04-19
(All figures in circuit MVA)
Ce
ntr
al S
ecto
r
Sta
te S
ecto
r
JV
Pri
va
te S
ecto
r
To
tal
Ce
ntr
al S
ecto
r
Sta
te S
ecto
r
JV
Pri
va
te S
ecto
r
To
tal
Ce
ntr
al S
ecto
r
Sta
te S
ecto
r
JV
Pri
va
te S
ecto
r
To
tal
Ce
ntr
al S
ecto
r
Sta
te S
ecto
r
JV
Pri
va
te S
ecto
r
To
tal
Ce
ntr
al S
ecto
r
Sta
te S
ecto
r
JV
Pri
va
te S
ecto
r
To
tal
Ce
ntr
al S
ec
tor
Sta
te S
ec
tor
JV
Pri
va
te S
ec
tor
Gra
nd
To
tal
3000 0 0 3000 0 0 0 0 18000 3000 6000 27000 5205 19665 4260 29130 800 21786 0 22586 27005 44451 10260 81716
Apr19 Programme 0 0 0 0 0 0 0 0 3000 0 3000 6000 0 1000 2000 3000 0 800 0 800 3000 1800 5000 9800
Achievement 0 0 0 0 0 0 0 0 500 0 0 500 815 1980 0 2795 0 1305 0 1305 1315 3285 0 4600
Upto Apr-19 Programme 0 0 0 0 0 0 0 0 3000 0 3000 6000 0 1000 2000 3000 0 800 0 800 3000 1800 5000 9800
Achievement 0 0 0 0 0 0 0 0 500 0 0 500 815 1980 0 2795 0 1305 0 1305 1315 3285 0 4600
21(1)
220 kV Grand Total 800 kV 500 kV
Programme 2019-20
Programme
Achievement
HVDC765 kV 400 kV
As on 30-04-19
Sl Voltage Ratio Capacity
No (kVkV) (MWMVA)
1 2 3 4 5
1 Bhadla SS (3x1500 3x500 MVA) 765400 PGCIL 500
2 Extn at Tumkur (Pavagada ) PS (2x500 MVA) 400220 PGCIL 500
3 Bongaigaon (2nd ICT) Ss 400220 PGCIL 315
Total of CENTRAL SECTOR 1315
4 Motiram Adda Gorakhpur (Aug) (Additional TF) 400220 UPPTCL 240
5 Muradnagar-II Ghaziabad (Aug) (Additional TF) 400220 UPPTCL 240
6 Noida Sec- 148 GBNagar (New) 400220 UPPTCL 5007 Sarnath Varanasi (Aug) TF- II (500-315) 400220 UPPTCL 1858 Sarojininagar Lucknow Aug) TF- II (500-315) 400220 UPPTCL 185
9 Unnao (Aug) TF-III 400220 UPPTCL 31510 Nawada SS 400220 HVPNL 31511 Kharepatan SS 22033 MSETCL 2512 Prathipadu SS 220132 APTRANSCO 10013 Pali Ss 22066 HVPNL 160
14 A-5 Faridabad Ss 22066 HVPNL 60
15 Rentachintala Ss Aug(3X100-2x100) 220132 APTRANSCO 10016 Amethi Ss 220132 UPPTCL 160
17 Gajokhar Varanasi (Aug) TF- II (160-100) 220132 UPPTCL 60
18 Gola Gorakhpur (New) 220132 UPPTCL 160
19 Khurja Bulandshahr (Aug) TF- II (200-160) 220132 UPPTCL 40
20 RC Green GB Nagar (Aug) TF-II (160-100) 220132 UPPTCL 60
21 Sikandrabad Bulandshahr (Aug) (Additional TF) 220132 UPPTCL 160
22 Sitapur (Aug) (Additional TF) 220132 UPPTCL 160
23 Sohawal Ayodhya (Aug) TF-II (160-100) 220132 UPPTCL 60
TOTAL STATE SECTOR 3285
GRAND TOTAL 4600
21(2)
CENTRAL SECTOR
STATE SECTOR
2Sub-Stations (220 kV and above) CommissionedReady for commissioning During Apr-2019
Name of Sub Stations Executing Agency
SN Contents Page
1 Electricity Generation (MU) Targets and Achievements for 2019-20 22
Section E - Electricity Generation
Programme Achievement Ach Programme Achievement Ach
Central Sector 37545100 3177900 3129530 9848 3177900 3129530 9848
State Sector 37498600 3322500 2950558 8881 3322500 2950558 8881
PvtIPP Sector 37346200 3236400 3195940 9875 3236400 3195940 9875
PvtUTL Sector 1823100 159300 165579 10394 159300 165579 10394
Total 114213000 9896100 9441607 9541 9896100 9441607 9541
Central Sector 5661700 386100 481390 12468 386100 481390 12468
State Sector 6680500 498200 536514 10769 498200 536514 10769
PvtIPP Sector 1206900 57300 80405 14032 57300 80405 14032
PvtUTL Sector 144100 12300 10930 8886 12300 10930 8886
Total 13693200 953900 1109239 11628 953900 1109239 11628
Central Sector 4472000 367300 317765 8651 367300 317765 8651
Total 4472000 367300 317765 8651 367300 317765 8651
Bhutan Import 621800 17500 24396 13941 17500 24396 13941
Central Sector 47678800 3931300 3928685 9993 3931300 3928685 9993
State Sector 44179100 3820700 3487072 9127 3820700 3487072 9127
Pvt Sector 40520300 3465300 3452854 9964 3465300 3452854 9964
Total 133000000 11234800 10893007 9696 11234800 10893007 9696
Provisional based on actual-cum-Assesment
Figs in MU
Cummulative
Achievement
Cummulative
Achievement
Mar-19 Mar-18 Upto Mar-2019 Upto Mar-2018
984785 869291 12675910 10183949
22
1 Electricity Generation (MU) Targets and Achievememts for 2019-20
All India Energy Generation During Apr-19 to Apr-19 (MU)
Target (2019-20)Apr-19 to Apr-19
Sector
Hydro
Thermal
Nuclear
Renewable Energy Generation
Achievement
Apr-2019
98961
95393673
112348
94416
11092
3178
108930
0
20000
40000
60000
80000
100000
120000
Thermal Hydro Nuclear Total
Programme
Achievement
SN Contents Page
1 Energy Power Supply Position (Provisional) for Apr-2019 and during Apr-19 to Apr-19 23
2 Peak Power Supply Position (Provisional) for Apr-2019 and during Apr-19 to Apr-19 24
3 Energy Power Supply Position (Revised) for Mar-2019 and during Apr-19 to Mar-19 25
4 Peak Power Supply Position (Revised) for Mar-2019 and during Apr-19 to Mar-19 26
5 Notified Power cuts Restrictions on Industries during Apr-2019 27
6 Power Supply to Agricultural Sector during Apr-2019 28
Section F - Power supply position
आकड़ मममलयन यननट नट Figures in MU net
ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied
कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )
चडीगढ़ Chandigarh 117 117 0 00 117 117 0 00
दिलली Delhi 2698 2698 1 00 2698 2698 1 00
हरियजणज Haryana 3773 3773 0 00 3773 3773 0 00
दहमजचल परिश Himachal Pradesh 777 777 0 00 777 777 0 00
रमम कशमीि Jammu amp Kashmir 1604 1296 308 192 1604 1296 308 192
परजब Punjab 3646 3646 0 00 3646 3646 0 00
िजरसथजन Rajasthan 6210 6208 2 00 6210 6208 2 00
उतति परिश Uttar Pradesh 10179 10148 32 03 10179 10148 32 03
उततिजखड Uttarakhand 1120 1120 0 00 1120 1120 0 00
उततरी कषतर Northern Region 30094 29786 308 10 30094 29786 308 10
छततीसगढ़ Chhattisgarh 2684 2676 8 03 2684 2676 8 03
गरिजत Gujarat 10718 10718 0 00 10718 10718 0 00
मधय परिश Madhya Pradesh 6006 6006 0 00 6006 6006 0 00
महजिजषटर Maharashtra 14308 14308 0 00 14308 14308 0 00
िमन औि दिउ Daman amp Diu 220 220 0 00 220 220 0 00
िजिि व नगि हवली Dadra amp Nagar Haveli 552 552 0 00 552 552 0 00
गोवज Goa 388 388 0 00 388 388 0 00
पशचिमी कषतर Western Region 34875 34868 8 00 34875 34868 8 00
आनधर परिश Andhra Pradesh 5708 5708 0 00 5708 5708 0 00
तलगजनज Telangana 5725 5725 0 00 5725 5725 0 00
कनजाटक Karnataka 7003 7003 0 00 7003 7003 0 00
किल Kerala 2402 2400 2 01 2402 2400 2 01
तममल नजड Tamil Nadu 10010 10010 0 00 10010 10010 0 00
पडचिी Puducherry 263 263 0 00 263 263 0 00
लकष-दवीप Lakshadweep 4 4 0 0 4 4 0 0
दकषकषणी कषतर Southern Region 31111 31109 2 00 31111 31109 2 00
बबहजि Bihar 2589 2589 0 00 2589 2589 0 00
िजमोिि घजटी ननगम DVC 1772 1772 0 00 1772 1772 0 00
झजिखणड Jharkhand 689 689 0 00 689 689 0 00
ओडडशज Odisha 2689 2689 1 00 2689 2689 1 00
पशशचम बगजल West Bengal 5075 5075 0 00 5075 5075 0 00
मसशककम Sikkim 37 37 0 00 37 37 0 00
अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 7 29 27 2 7
परवी कषतर Eastern Region 12851 12850 1 00 12851 12850 1 00
अरणजचल परिश Arunachal Pradesh 66 66 0 05 66 66 0 05
असम Assam 766 709 57 75 766 709 57 75
मणणपि Manipur 68 67 1 15 68 67 1 15
मघजलय Meghalaya 170 160 10 59 170 160 10 59
ममज़ोिम Mizoram 54 53 0 08 54 53 0 08
नजगजलड Nagaland 54 54 0 08 54 54 0 08
बिपिज Tripura 122 120 1 12 122 120 1 12
उततर-परवी कषतर North-Eastern Region 1300 1228 71 55 1300 1228 71 55
समपणण भारत All India 110231 109842 389 04 110231 109842 389 04
23
ऊरजा पनत ा म कमी ऊरजा पनत ा म कमीEnergy not Supplied
Excludes energy exported to Bangladesh
Energy not Supplied
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
ऊराण वरवदयत आपरत ण शथिरत ररपोरण (परवाणरवलोकन) Energy Power Supply Position Report (Provisional)
राजयState
अपरल 2019 April2019 अपरल2019 -अपरल2019 April2019 to April2019
अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met
कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )
चडीगढ़ Chandigarh 256 256 0 00 256 256 0 00
दिलली Delhi 5664 5664 0 00 5664 5664 0 00
हरियजणज Haryana 8127 8127 0 00 8127 8127 0 00
दहमजचल परिश Himachal Pradesh 1387 1387 0 00 1387 1387 0 00
रमम कशमीि Jammu amp Kashmir 2826 2261 565 200 2826 2261 565 200
परजब Punjab 7015 7015 0 00 7015 7015 0 00
िजरसथजन Rajasthan 10560 10560 0 00 10560 10560 0 00
उतति परिश Uttar Pradesh 19935 19935 0 00 19935 19935 0 00
उततिजखड Uttarakhand 1922 1922 0 00 1922 1922 0 00
उततरी कषतर Northern Region 54476 53985 491 09 54476 53985 491 09
छततीसगढ़ Chhattisgarh 4596 4574 22 05 4596 4574 22 05
गरिजत Gujarat 17871 17865 6 00 17871 17865 6 00
मधय परिश Madhya Pradesh 10018 10018 0 00 10018 10018 0 00
महजिजषटर Maharashtra 23158 23150 8 00 23158 23150 8 00
िमन औि दिउ Daman amp Diu 341 340 1 02 341 340 1 02
िजिि व नगि हवली Dadra amp Nagar Haveli 818 818 0 00 818 818 0 00
गोवज Goa 594 594 0 00 594 594 0 00
पशचिमी कषतर Western Region 56242 56222 20 00 56242 56222 20 00
आनधर परिश Andhra Pradesh 9151 9151 0 00 9151 9151 0 00
तलगजनज Telangana 10191 10191 0 00 10191 10191 0 00
कनजाटक Karnataka 12681 12681 0 00 12681 12681 0 00
किल Kerala 4309 4300 8 02 4309 4300 8 02
तममल नजड Tamil Nadu 15972 15972 0 00 15972 15972 0 00
पडचिी Puducherry 482 480 2 05 482 480 2 05
लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0
दकषकषणी कषतर Southern Region 49155 49103 52 01 49155 49103 52 01
बबहजि Bihar 5357 5357 0 00 5357 5357 0 00
िजमोिि घजटी ननगम DVC 3039 3039 0 00 3039 3039 0 00
झजिखणड Jharkhand 1266 1266 0 00 1266 1266 0 00
ओडडशज Odisha 5389 5389 0 00 5389 5389 0 00
पशशचम बगजल West Bengal 8666 8666 0 00 8666 8666 0 00
मसशककम Sikkim 100 100 0 00 100 100 0 00
अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7
परवी कषतर Eastern Region 23349 23349 0 00 23349 23349 0 00
अरणजचल परिश Arunachal Pradesh 139 136 3 22 139 136 3 22
असम Assam 1712 1667 45 26 1712 1667 45 26
मणणपि Manipur 197 188 9 46 197 188 9 46
मघजलय Meghalaya 336 336 0 00 336 336 0 00
ममज़ोिम Mizoram 116 113 3 26 116 113 3 26
नजगजलड Nagaland 157 131 26 166 157 131 26 166
बिपिज Tripura 292 291 1 03 292 291 1 03
उततर-परवी कषतर North-Eastern Region 2848 2780 68 24 2848 2780 68 24
समपणण भारत All India 177411 176810 601 03 177411 176810 601 03
24
मजग की पनत ा म कमी Demand not Met
Excludes the supply to Bangladesh
राजयStateअपरल 2019 April2019
मजग की पनत ा म कमी Demand not Met
अधिकतम वरवदयत आपरत ण शथिरत ररपोरण (परवाणरवलोकन) Peak Power Supply Position Report (Provisional)
आकड़ मगज वजट नट Figures in MW netअपरल2019 -अपरल2019 April2019 to April2019
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
आकड़ मममलयन यननट नट Figures in MU net
ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied
कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )
चडीगढ़ Chandigarh 96 96 0 00 1561 1561 0 00
दिलली Delhi 1931 1930 1 00 32299 32282 17 01
हरियजणज Haryana 3658 3658 0 00 53665 53665 0 00
दहमजचल परिश Himachal Pradesh 832 830 2 02 9850 9618 232 24
रमम कशमीि Jammu amp Kashmir 1767 1414 353 200 19593 15868 3725 190
परजब Punjab 3585 3585 0 00 55288 55275 13 00
िजरसथजन Rajasthan 6774 6770 4 01 79826 79637 189 02
उतति परिश Uttar Pradesh 8754 8691 63 07 117101 116118 984 08
उततिजखड Uttarakhand 1067 1067 0 00 13845 13753 92 07
उततरी कषतर Northern Region 28464 28041 423 15 383028 377776 5251 14
छततीसगढ़ Chhattisgarh 2464 2457 8 03 26130 26076 54 02
गरिजत Gujarat 9890 9890 0 00 116588 116572 15 00
मधय परिश Madhya Pradesh 6236 6236 0 00 75667 75665 2 00
महजिजषटर Maharashtra 13631 13631 0 00 158285 158148 137 01
िमन औि दिउ Daman amp Diu 221 221 0 00 2557 2557 0 00
िजिि व नगि हवली Dadra amp Nagar Haveli 553 553 0 00 6317 6317 0 00
गोवज Goa 362 362 0 00 4283 4280 3 01
पशचिमी कषतर Western Region 33357 33349 8 00 389827 389615 212 01
आनधर परिश Andhra Pradesh 6072 6071 1 00 63735 63677 58 01
तलगजनज Telangana 6930 6929 1 00 66697 66635 62 01
कनजाटक Karnataka 7614 7612 1 00 71759 71690 69 01
किल Kerala 2489 2488 1 00 25029 24911 118 05
तममल नजड Tamil Nadu 10247 10245 2 00 109375 109273 102 01
पडचिी Puducherry 252 251 1 04 2761 2751 10 03
लकष-दवीप Lakshadweep 4 4 0 0 46 46 0 0
दकषकषणी कषतर Southern Region 33605 33597 8 00 339355 338938 417 01
बबहजि Bihar 2319 2318 1 00 30052 29827 225 07
िजमोिि घजटी ननगम DVC 1773 1772 1 00 22365 21995 369 17
झजिखणड Jharkhand 698 697 1 01 8682 8461 221 25
ओडडशज Odisha 2583 2582 1 00 31810 31781 30 01
पशशचम बगजल West Bengal 4585 4584 2 00 52237 52078 159 03
मसशककम Sikkim 41 41 0 00 513 512 0 01
अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 67 346 323 23 67
परवी कषतर Eastern Region 11999 11995 5 00 145658 144654 1004 07
अरणजचल परिश Arunachal Pradesh 61 60 0 06 864 855 9 10
असम Assam 680 656 23 34 9532 9204 328 34
मणणपि Manipur 68 68 1 09 916 906 10 11
मघजलय Meghalaya 173 173 0 03 1955 1953 1 01
ममज़ोिम Mizoram 50 49 0 09 668 661 8 12
नजगजलड Nagaland 58 57 1 20 902 809 93 103
बिपिज Tripura 150 150 0 00 1859 1837 21 11
उततर-परवी कषतर North-Eastern Region 1240 1214 26 21 16696 16225 471 28
समपणण भारत All India 108665 108196 469 04 1274564 1267209 7355 06
Note The revised data for March 2019 is not avaliable
Excludes energy exported to Bangladesh
राजयState
ऊराण वरवदयत आपरत ण शथिरत ररपोरण (परवाणरवलोकन) Energy Power Supply Position Report (Provisional)
25
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
Energy not Supplied Energy not Supplied
मािण2019 March2019 अपरल2018 -मािण2019 April2018 to March2019
ऊरजा पनत ा म कमी ऊरजा पनत ा म कमी
अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met
कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )
चडीगढ़ Chandigarh 223 223 0 00 369 369 0 00
दिलली Delhi 4016 4016 0 00 7016 7016 0 00
हरियजणज Haryana 6544 6544 0 00 10270 10270 0 00
दहमजचल परिश Himachal Pradesh 1683 1683 0 00 1700 1700 0 00
रमम कशमीि Jammu amp Kashmir 3277 2622 655 200 3277 2622 655 200
परजब Punjab 6564 6564 0 00 12638 12638 0 00
िजरसथजन Rajasthan 11885 11885 0 00 13276 13276 0 00
उतति परिश Uttar Pradesh 16220 16220 0 00 20498 20062 436 21
उततिजखड Uttarakhand 2002 2002 0 00 2216 2216 0 00
उततरी कषतर Northern Region 47925 47356 569 12 63166 61726 1440 23
छततीसगढ़ Chhattisgarh 4444 4128 316 71 4444 4270 174 39
गरिजत Gujarat 16263 16263 0 00 17053 16963 90 05
मधय परिश Madhya Pradesh 12328 12323 5 00 13815 13815 0 00
महजिजषटर Maharashtra 22361 22291 70 03 23864 23254 610 26
िमन औि दिउ Daman amp Diu 336 336 0 01 357 356 1 02
िजिि व नगि हवली Dadra amp Nagar Haveli 800 799 1 01 816 815 1 01
गोवज Goa 538 538 0 00 596 596 0 00
पशचिमी कषतर Western Region 53132 52965 167 03 56675 55821 853 15
आनधर परिश Andhra Pradesh 8977 8977 0 00 9459 9453 6 01
तलगजनज Telangana 10471 10471 0 00 10815 10815 0 00
कनजाटक Karnataka 12841 12841 0 00 12841 12841 0 00
किल Kerala 4264 4228 36 09 4264 4228 36 09
तममल नजड Tamil Nadu 15712 15712 0 00 15712 15712 0 00
पडचिी Puducherry 427 412 15 34 427 412 15 34
लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0
दकषकषणी कषतर Southern Region 49464 49464 0 00 49464 49464 0 00
बबहजि Bihar 4633 4633 0 00 5115 5084 31 06
िजमोिि घजटी ननगम DVC 3035 3035 0 00 3035 3035 0 00
झजिखणड Jharkhand 1210 1210 0 00 1339 1291 48 36
ओडडशज Odisha 4827 4827 0 00 5357 5357 0 00
पशशचम बगजल West Bengal 8287 8287 0 00 9130 9123 7 01
मसशककम Sikkim 100 100 0 00 106 106 0 00
अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7
परवी कषतर Eastern Region 21658 21658 0 00 23141 22733 408 18
अरणजचल परिश Arunachal Pradesh 133 131 2 15 138 138 0 01
असम Assam 1539 1508 31 20 1865 1809 56 30
मणणपि Manipur 204 199 5 25 219 216 3 12
मघजलय Meghalaya 357 357 0 00 374 372 1 04
ममज़ोिम Mizoram 108 105 3 28 121 119 2 17
नजगजलड Nagaland 127 125 2 16 156 138 18 116
बिपिज Tripura 249 249 0 00 298 293 5 17
उततर-परवी कषतर North-Eastern Region 2540 2535 5 02 2967 2850 117 39
समपणण भारत All India 169464 168745 719 04 177022 175528 1494 08
Note The revised data for March 2019 is not avaliable 26
अधिकतम वरवदयत आपरत ण शथिरत ररपोरण (परवाणरवलोकन) Peak Power Supply Position Report (Provisional)
आकड़ मगज वजट नट Figures in MW net
राजयStateमािण2019 March2019 अपरल2018 -मािण2019 April2018 to March2019
मजग की पनत ा म कमी मजग की पनत ा म कमी Demand not MetDemand not Met
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
Excludes the supply to Bangladesh
अपरल 2019 April2019 अपरल2018 -मािण2019 April2019 to April2019
उततरी कषतर Northern Region
चडीगढ़ Chandigarh(Data Not Received)दिलली Delhi
हरियजणज Haryana
दहमजचल परिश Himachal Pradeshरमम कशमीि Jammu amp Kashmir(Data
Not Received)परजब Punjab
िजरसथजन Rajasthanउतति परिश Uttar Pradesh
उततिजखड Uttarakhand
पशचिमी कषतर Western Region
छततीसगढ़ Chhattisgarh
Apr-Nov 2018- No cuts
Maximum Demand cut-58MW
Energy cut- 00020-00032 MUsday
गरिजत Gujarat
मधय परिश Madhya Pradesh
महजिजषटर Maharashtra
गोवज Goa
दकषकषणी कषतर Southern Region
आनधर परिश Andhra Pradesh
तलगजनज Telangana
कनजाटक Karnataka
किल Kerala
तममल नजड Tamil Nadu
पडचिी Puducherryपरवी कषतर Eastern Region
बबहजि Bihar
झजिखणड Jharkhand
ओडडशज Odisha
पशशचम बगजल West Bengal
No N
otifie
d Cu
ts
27
मािण 2019 म इडथरीर पर वरवदयत करौती का वरवरवरण Notified Power CutsRestrictions on Industries during April2019
राजय कषतर State Regionऊराणमाग करौती EnergyDemand Cut
No N
otifie
d Cu
tsNo
Notifie
d Cu
ts
अपरल2019 April 2019 अपरल2019 -अपरल2019 April2019 to April2019
उततरी कषतर Northern Region
चडीगढ़ Chandigarh Data not received Data not received
दिलली Delhi Data not received Data not received
हरियजणज Haryana 0811 hrsday 0811 hrsday
दहमजचल परिश Himachal Pradesh HPSEBL has only 2 agriculture consumers and uninterrupted
power is being supplied to agriculture sector
HPSEBL has only 2 agriculture consumers and uninterrupted
power is being supplied to agriculture sector
रमम कशमीि Jammu amp Kashmir Data not received Data not received
परजब Punjab 379 hrsday 379 hrsday
िजरसथजन Rajasthan 0630 hrsday 0630 hrsday
उतति परिश Uttar Pradesh 2157 hrsday 2157 hrsday
उततिजखड Uttarakhand 2359 hrsday 2359 hrsday
पशचिमी कषतर Western Region
छततीसगढ़ Chhattisgarh 18 hrsday 18 hrsday
गरिजत Gujarat 8 hrsday 8 hrsday
मधय परिश Madhya Pradesh Three-Phase Supply(Irrigation)- 0953 hrs day Three-Phase
(Mixed) Supply - 2334 hrs day
Three-Phase Supply(Irrigation)- 0953 hrs day Three-Phase
(Mixed) Supply - 2334 hrs day
महजिजषटर Maharashtra Three-Phase Supply(Irrigation)- 9 hrs day Three-Phase Supply(Irrigation)- 9 hrs day
गोवज Goa No restriction No restriction
दकषकषणी कषतर Southern Region
आनधर परिश Andhra Pradesh 07 hrsday 07 hrsday
तलगजनज Telangana 24 hrsday 24 hrsday
कनजाटक Karnataka 6 hrsday 6 hrsday
किल Kerala No Restrictions No Restrictions
तममल नजड Tamil Nadu 9 hrsday (6 hrs during day time and 3 hrs during night time) 9 hrsday (6 hrs during day time and 3 hrs during night time)
पडचिी Puducherry No Restrictions No Restrictions
परवी कषतर Eastern Region
बबहजि Bihar 18 hrsday 18 hrsday
झजिखणड Jharkhand 20 hrsday 20 hrsday
ओडडशज Odisha 24 hrsday 24 hrsday
पशशचम बगजल West Bengal 23 hrsday 23 hrsday
28
मारच 2019 कषि कषतर को षिदयत आपरतच का षििरण Power Supply to Agricultural Sector during March2019
राजय कषतर State Regionऔसत वरवदयत आपरत ण घनरो म Average Hours of Supply
On segregated feeders
SNo Contents Page
1 Growth of Installed Capacity since 6th Plan 29
2 Progress of Transmission Sector since 6th Plan 30
3 All India Yearly Coal consumption for Power Generation (Utilities)
4 All India Annual Per Capita Consumption of Electricity since -2006
5 Average cost of power supply amp Average realisation (Paisakwh)
6 Growth of Rural Electrification amp Pump Sets Energisation
7 Status of Hydro Schemes Cleared by the CEA in Apr-2019
Section G - Growth of Power Sector
31
32
(In MW)
Coal Gas Diesel Total
End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472
End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634
End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537
End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596
End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921
End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703
End of 12th Plan 19216288 2532938 83763 21832988 6780 4447842 50018 31960630
Up to Apr-2019 20070450 2493722 63763 22627934 678000 4539922 7764163 35610019
Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-17) = 51529 MW
Electricity Generation (MU) Targets and Achievements for 2016-17
Coal Gas Diesel Nuclear Hydro Res Total
2007045 2493722 637629 678000 453992 77641625 22925174
29
1 Growth of Installed Capacity Since 6th Plan
Plan YearThermal
Nuclear Hydro RES (MNRE) Total
2007045
2493722637629
678000
4539922
77641625
Total Installed Capacity 35610019 MW
Coal Gas Diesel Nuclear Hydro Res
Progress of Transmission Sector in the Country up to April 2019
1 TRANSMISSION LINES (All fig in CKM)
At the end of
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
6th plan 0 0 0 0 0 0 0 0 0 0 0 0 1831 4198 0 6029 1641 44364 0 46005 3472 48562 0 52034
7th plan 0 0 0 0 0 0 0 0 0 0 0 0 13068 6756 0 19824 4560 55071 0 59631 17628 61827 0 79455
8th plan 0 0 0 0 1634 0 0 1634 0 0 0 0 23001 13141 0 36142 6564 73036 0 79600 31199 86177 0 117376
9th plan 0 0 0 0 3234 1504 0 4738 751 409 0 1160 29345 20033 0 49378 8687 88306 0 96993 42017 110252 0 152269
10th plan 0 0 0 0 4368 1504 0 5872 1775 409 0 2184 48708 24730 0 73438 9444 105185 0 114629 64295 131828 0 196123
11th Plan 0 0 0 0 5948 1504 1980 9432 4839 411 0 5250 71023 30191 5605 106819 10140 125010 830 135980 91950 157116 8415 257481
12th Plan 6124 0 0 6124 5948 1504 1980 9432 25465 1177 4598 31240 92482 48240 17065 157787 11014 151276 978 163268 141033 202197 24621 367851
13th Plan (Up
to Mar2019)6124 0 0 6124 5948 1504 1980 9432 33692 1512 6605 41809 101335 58238 21173 180746 11734 162552 1010 175296 158833 223806 30768 413407
13th Plan (Up
to Apr-19)6124 0 0 6124 5948 1504 1980 9432 33745 1512 6605 41862 101335 58258 21173 180766 11734 162953 1010 175697 158886 224227 30768 413881
27150 600 MW of 132 kV Inter-Regional power transmission capacity links which are operated radially from time to time is not added in the total
75050
47900
24000
99050
30
Grand Total
Note - The figure upto the end of 10th plan in for stringing progress including the lines not commissioned Now only commissioned lines are reckoned Accordingly the figure for 10th plan (end) may read
as 187555 after adjusting with (-) 10852 Ckm
Inter-regional Power Transfer Capacity (MW)
plusmn 800 kV HVDC plusmn 500 kV HVDC 765 kV 400 kV 220 kV
IR addition in 12th
Plan (up to March
2017)
Inter-regional
Transmission
Capacity at the end
of Plan Period 2017-
22 (as on April19)
IR at the end of 11th
PlanIR at the end of 12th
Plan
IR Capacity Addition
at the end of Plan
Period 2017-22 (Till
April 19)
2004-05 27800
2005-06 28100
2006-07 30200
2007-08 33000
2008-09 35500
2009-10 36700
2010-11 38700
2011-12 41756
2012-13 45460
2013-14 48940
2014-15 53040
2015-16 54590
2016-17 57430
2017-18 60800
2018-19 62890
Year
2005-06
2006-07
2007-08
2008-09
2009-10
2010-11
2011-12
2012-13
2013-14
2014-15
2015-16
2016-17
2017-18
2018-19
2004-05 254 209 7568
2005-06 260 221 7636
2006-07 276 227 7423
2007-08 293 239 7727
2008-09 340 263 8713
2009-10 355 268 8870
2010-11 398 303 11975
2011-12 455 330 13514
2012-13 501 376 14867
2013-14 518 175
2014-15 520
Source- PFC Reports on the performance of State Power Utilities 31
1181
7335
7786
91441
8188
88363
957
1010
1075
1122
1149
(GrossGen+ Net Import) Mid-year population Provisional
5 Average cost of power supply amp average realization ( paiseKWH )
Yearcost of supply
(paiseunit)
Realization(paiseunit)
Including AgricultureOnly
Agriculture
6719
7171
3 All India yearly Coal Consumption for Power Generation (Utilities)
YEARCoal Consumption
Million Tonnes
4 All India Annual per Capita consumption of Electricity Since 2006
Per Capita Consumption ( kWh)
6314
Sl
NoExecuting Agency
Installed
Capacity (MW)Cost (Rs crore)
Date of
Clearance
32
Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as
Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received
from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made
available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified
villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is
independent of the earlier published reports
No Hydro Electric Project has been issued concurrenceAppraisal letter by CEA during April 2019
7 Status of Hydro Schemes Cleared by the CEA in Apr-2019
Name of Scheme
1999-002000-01
297594
010408 to 310309010409 to 310310
10th Plan
2005-062006-07
322968331020
6 Growth Of Rural Electrification amp Pumpsets Energisation
Plan Year
9th Plan2002-03
134092626
4111
Pump Sets Energised Villages Electricfied (Nos)
2001-02
284064367244
1218
27801997-981998-99
3207
482864
12632
1576036
4451722594
15455554
2314176
397343611750
2093311060316074
65109527813884
46708
18423975
499150
2003-042004-05
5743
9769
Cumu upto End of 10th Plan
010407 to 310308
010410 to 310311557976840909
010411 to 310312
412667
86293726
No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification
since 2004-05
65291374575 296361511th Plan
Cumu upto End of 11th Plan
596556 21212860
557439Cummulative up to end of 12th Plan
SN Contents Page
1 Rate of sale of power for the year 2016-17 33-41
RATE OF SALE OF POWER FOR THE YEAR 2016-17
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) NORTHERN REGION
CENTRAL SECTOR
BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 18000 66900 19800
CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 54000 222400 21600
CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 30000 144400 19600
CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 23100 91700 42600
PARBATI - III HPS NHPC LTD HYDRO-HYDRO 52000 68200 54800
DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 28000 95600 30000
CHUTAK NHPC LTD HYDRO-HYDRO 4400 22000 79800
DULHASTI HPS NHPC LTD HYDRO-HYDRO 39000 228000 56400
SALAL HPS NHPC LTD HYDRO-HYDRO 69000 342300 11000
TANAKPUR HPS NHPC LTD HYDRO-HYDRO 9420 43000 29600
URI HPS -I NHPC LTD HYDRO-HYDRO 48000 280300 16000
URI HPS - II NHPC LTD HYDRO-HYDRO 24000 147300 48600
NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 4500 24600 88200
SEWA - II NHPC LTD HYDRO-HYDRO 12000 47100 43400
ANTA CCPP NTPC LTD THERMAL-GASN 41930 67539 32400
AURAIYA CCPP NTPC LTD THERMAL-GASN 66336 53501 39100
BADARPUR TPS NTPC LTD THERMAL-COAL 70500 159153 44800
DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 84000 296170 42300
DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 98000 526686 46300
DADRI CCPP NTPC LTD THERMAL-GASHSD 82978 227469 33000
FARIDABAD CCPP NTPC LTD THERMAL-GASN 43159 115577 30800
RIHAND STPS I NTPC LTD THERMAL-COAL 100000 596766 24500
RIHAND STPS II NTPC LTD THERMAL-COAL 100000 737069 24600
RIHAND STPS III NTPC LTD THERMAL-COAL 100000 706546 30600
SINGRAULI STPS NTPC LTD THERMAL-COAL 200000 1394068 20400
TANDA TPS NTPC LTD THERMAL-COAL 44000 295438 40800
UNCHAHAR TPS I NTPC LTD THERMAL-COAL 42000 256454 39800
UNCHAHAR TPS II NTPC LTD THERMAL-COAL 42000 273577 38900
UNCHAHAR TPS III NTPC LTD THERMAL-COAL 21000 142780 43000
KOLDAM NTPC LTD HYDRO-HYDRO 80000 363260 43600
NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 303575 25841
RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 108000 668677 35374
NJHPS SJVNL HYDRO-HYDRO 150000 699496 23820
RAMPUR HPS SJVNL HYDRO-HYDRO 41202 195982 32260
TEHRI HPP THDC HYDRO-HYDRO 100000 272543 51800
KOTESHWAR HEP THDC HYDRO-HYDRO 40000 106244 53400
IGSTPS JHAJJAR ARAVALI P CPL THERMAL-COAL 150000 510429 49490
NEYVELI BARSINGSAR NEYVELI LIG CORP LTD THERMAL-LIG 25000 127520 38040
STATE SECTOR
PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 21000 14222 48200
PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 21000 19205 48400
PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 25000 102257 42600
PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 25000 62107 41800
DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 60000 312213 41000
RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 120000 35767442200
WYC HYDEL STATION HPGCL HYDRO-HYDRO 6240 20365 24900
GIRI POWER HOUSE HPSEB HYDRO-HYDRO 6000 13958 7600
ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 1695 5467 11900
BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 12000 18528 6700
GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 2250 7462 22500
BASSI POWER HOUSE HPSEB HYDRO-HYDRO 6600 29649 7500
BINWA POWER HOUSE HPSEB HYDRO-HYDRO 600 2749 19300
ANNEXURE-I
RATE OF SALE OF POWER FOR THE YEAR 2016-2017
Page 33
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) GAJ POWER HOUSE HPSEB HYDRO-HYDRO 1050 2914 26700
BANER POWER HOUSE HPSEB HYDRO-HYDRO 1200 2864 16200
HOLI POWER HOUSE HPSEB HYDRO-HYDRO 300 616 22500
THIROT POWER HOUSE HPSEB HYDRO-HYDRO 450 1126 22500
KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 1200 3064 22500
LARJI POWER HOUSE HPSEB HYDRO-HYDRO 12600 53677 23700
NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 250 750 31000
CHABA POWER HOUSE HPSEB HYDRO-HYDRO 175 465 23300
RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 150 101 13400
SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 200 000 22500
KILLAR HPSEB HYDRO-HYDRO 030 050 22500
BHABA AUGUMENP H HPSEB HYDRO-HYDRO 450 1276 22500
BS CHAMBA HPSEB HYDRO-HYDRO 045 099 19500
GUMMA HPSEB HYDRO-HYDRO 300 423 22500
GAS TURBINE POWER STATION IPGCL THERMAL-GAS 27000 67233 39300
PPS-I PPCL THERMAL-GAS 33000 175905 38300
PPS-III PPCL THERMAL-GAS 137120 196879 36100
LOWER JHELUM JampKPDD HYDRO-HYDRO 10500 60214 5100
UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 2260 10514 6300
UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 10500 44202 8500
GANDHARBAL JampKPDD HYDRO-HYDRO 1500 8925 4700
KARNAH MPH JampKPDD HYDRO-HYDRO 200 1122 31000
CHENANI I JampKPDD HYDRO-HYDRO 2330 10892 6600
CHENANI II JampKPDD HYDRO-HYDRO 200 1188 9300
CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 750 3634 14200
IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 375 2108 18500
IGO MERCHELLONG JampKPDD HYDRO-HYDRO 300 1572 29700
PAHALGAM MHP JampKPDD HYDRO-HYDRO 450 1713 32900
MARPACHOO JampKPDD HYDRO-HYDRO 075 375 29800
HAFTAL JampKPDD HYDRO-HYDRO 100 483 28700
SANJAK JampKPDD HYDRO-HYDRO 126 441 36000
SEWA-III JampKPDD HYDRO-HYDRO 900 3273 20200
BHADERWAH JampKPDD HYDRO-HYDRO 150 935 8900
BAZGO JampKPDD HYDRO-HYDRO 030 108 33300
SUMOOR JampKPDD HYDRO-HYDRO 010 045 35400
HUNDER JampKPDD HYDRO-HYDRO 040 176 26200
STAKNA JampKPDD HYDRO-HYDRO 400 1933 4100
KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 124000 662879 31360
SURATGARH TPS RRVUNL THERMAL-COAL 150000 402328 41730
CHHABRA TPS 1amp 2 RRVUNL THERMAL-COAL 50000 305946 36700
CHHABRA TPS 3 RRVUNL THERMAL-COAL 25000 151536 36700
CHHABRA TPS 4 RRVUNL THERMAL-COAL 25000 155896 36700
RAMGARH GT POWER PROJECT RRVUNL THERMAL-COAL 22050 43177 41800
RAMGARH GAS T P PROJECT 3 RRVUNL THERMAL-GAS 5000 93615 41800
DHOLPUR C C POWER PROJECT RRVUNL THERMAL-R-LNG 33000 9486 46110
MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 14000 20855 34192
MINI MICRO HYDEL (MMH) P S RRVUNL HYDRO-HYDRO 2385 851 37800
KALISINDH TPP 1 RRVUNL THERMAL-COAL 60000 341543 45000
KALISINDH TPP 2 RRVUNL THERMAL-COAL 60000 211588 45000
KHARA HEP UPJVNL HYDRO-HYDRO 7200 26654 7200
MATATILLA HEP UPJVNL HYDRO-HYDRO 3060 12219 6500
OBRA HEP UPJVNL HYDRO-HYDRO 9900 21517 6300
RIHAND UPJVNL HYDRO-HYDRO 30000 57369 5500
ANPARA A TPS UPRVUNL THERMAL-COAL 63000 317536 27000
ANPARA B TPS UPRVUNL THERMAL-COAL 100000 705605 22700
ANPARA D UPRVUNL THERMAL-COAL 100000 300158 39800
HARDUAGANJ TPS UPRVUNL THERMAL-COAL 16500 45817 49200
HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 50000 304389 46600
OBRA A TPS UPRVUNL THERMAL-COAL 28800 13158 34000
OBRA B TPS UPRVUNL THERMAL-COAL 100000 328124 21900
Page 34
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) PANKI TPS UPRVUNL THERMAL-COAL 21000 66488 50300
PARICHHA TPS UPRVUNL THERMAL-COAL 22000 38762 49400
PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 42000 231931 45600
PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 50000 276722 50400
CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 24000 70845 8290
CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 14400 75366 8390
DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 3375 9595 12080
DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 5100 18701 10520
KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4140 17359 12330
KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 12000 33001 9420
KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 3000 11953 8320
TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 9000 33983 12460
MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 30400 124510 16110
RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 19800 17897 10550
MPUR UTTARAKHAND JVNL HYDRO-HYDRO 930 5121 19200
PATHRI UTTARAKHAND JVNL HYDRO-HYDRO 2040 11636 14200
GALOGI UTTARAKHAND JVNL HYDRO-HYDRO 300 648 12500
PRIVATE SECTOR
MGTPP CLP INDIA PVT LTD THERMAL-COAL 132000 268902 41940
SHRINAGAR HEP ALAKNANDA HPCL HYDRO-HYDRO 33000 127414 48800
GAMA INFRAPROP CCPP GAMA INFRAPROP PVT THERMAL-GAS 22500 52686 47000
PPGCL (BARA) JP POWER VENTURES LTD THERMAL-COAL 198000 448200 38500
MALANA HEP MALANA PCL HYDRO-HYDRO 8600 26354 29792
MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 10000 30369 32580
ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 19200 56347 36079
KASHANG HEP H P PCL HYDRO-HYDRO 19500 5034 29200
BASPA-II HEP HBPCL HYDRO-HYDRO 30000 132769 13600
KARCHAM WANGTOO HEP HBPCL HYDRO-HYDRO 100000 434386 36600
RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 108000 582600 43700
RITHALA COMBI CY POWER PLANT TATA POWER DDL THERMAL-GAS 9480 000 11900
RAJPURA TPS NABHA POWER LTD THERMAL-GAS 140000 901484 39000
TALWANDI SABO POWER LTD TALWANDI SABO POWER LTD THERMAL-COAL 198000 636040 49548
ROJA THERMAL POWER STATION ROJA POWER SCL THERMAL-COAL 120000 727200 43400
KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 34400 63400
BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 36000 62600
MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 38200 60800
UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 37900 61500
KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 42300 58800
LALITPUR PGCL BAJAJ ENERGY PVT LTD THERMAL-COAL 198000 359400 47300
PRAYAGRAJ PGCL PRAYAGRAJ PGCL THERMAL-COAL 132000 448200 38595
KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 132000 783182 33438
WESTERN REGION
CENTRAL SECTOR
INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 100000 325333 23892
OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 52000 141663 34001
GANDHAR CCPP NTPC LTD THERMAL-GAS 65739 221924 28700
KAWAS CCPP NTPC LTD THERMAL-GASN 65620 167929 27000
KORBA I amp II NTPC LTD THERMAL-COAL 210000 1499171 20500
KORBA III NTPC LTD THERMAL-COAL 50000 358746 26600
SIPAT STPS I NTPC LTD THERMAL-COAL 198000 1479902 26800
SIPAT STPS II NTPC LTD THERMAL-COAL 100000 766549 26500
VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 126000 693142 25800
VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 100000 608781 23800
VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 100000 673475 27600
VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 100000 655924 32900
VINDHYACHAL STPS V NTPC LTD THERMAL-COAL 50000 328265 31700
MOUDA I NTPC LTD THERMAL-COAL 100000 343130 44500
MOUDA Ii NTPC LTD THERMAL-COAL 66000 40637 39900
RATNAGIRI GAS amp POWER PVT LTD RGPPL THERMAL-GAS 196708 442485 47000
KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 000 24729
TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 32000 201227 10740
Page 35
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 365122 19069
TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 787444 29324
STATE SECTOR
GSEG-HAZIRA15610 MW GUJARAT S ENEGEN LTD THERMAL-GAS 15610 1805 28200
GSEG-HAZIRA35143 MW GUJARAT S ENEGEN LTD THERMAL-GAS 35130 22276 51300
GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 21978 51800
AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 13929 26100
KORBA TPS EAST CSPGCL THERMAL-COAL 44000 198673 33880
DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 365808 27570
KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 316500 30420
HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 532878 19410
CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 515 58300
MTTPS CHAMPA U-I CSPGCL THERMAL-COAL 50000 220376 39000
MTTPS CHAMPA U-II CSPGCL THERMAL-COAL 50000 23709 10000
SHP GANGREL CSPGCL HYDRO-HYDRO 1000 2350 36790
BANGO HEP CSPGCL HYDRO-HYDRO 12000 14662 8900
MHP KORBA WEST CSPGCL HYDRO-HYDRO 170 859 38190
SIKASAR HEP CSPGCL HYDRO-HYDRO 700 418 26870
DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8843 74500
DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 19446 51500
GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 66388 71600
GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127488 41300
KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 96072 43900
KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 29841 56400
SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 184966 58800
UKAI 1-5 GSECL THERMAL-COAL 85000 204891 46900
UKAI TPS 6 GSECL THERMAL-COAL 50000 284448 48200
WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 271999 58300
WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 82808 44100
KADANA HPS GSECL HYDRO-HYDRO 24200 34433 16800
UKAI HPS GSECL HYDRO-HYDRO 30500 40585 6100
TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 123000 11500
BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 8900 10900
BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 7200 27500
JHINNA HPS MPPGCL HYDRO-HYDRO 2000 9700 18500
RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 44300 3400
GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 17300 4600
SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 4100 16900
MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 14600 27000
PENCH HPS MPPGCL HYDRO-HYDRO 16000 23700 8100
RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 3000 16900
AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 134400 35100
SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 283800 38700
SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 344600 34300
SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 111600 61600
SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 211800 58000
SSTPS PH-I MPPGCL THERMAL-COAL 120000 233100 84300
BHUSAWAL TPS MSPGCL THERMAL-COAL 142000 566258 51100
CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1365682 33700
KHAPERKHEDA MSPGCL THERMAL-COAL 134000 706207 39100
KORADI TPS MSPGCL THERMAL-COAL 62000 443206 42000
NASIK TPS MSPGCL THERMAL-COAL 63000 297275 47000
PARLI TPS MSPGCL THERMAL-COAL 113000 175934 71600
PARAS MSPGCL THERMAL-COAL 50000 267931 38700
URAN CCPP MSPGCL THERMAL-GAS 67200 320330 30600
KOYANA MSPGCL HYDRO-HYDRO 195600 328155 13100
SMALL HYDRO POWER PLANTS MSPGCL HYDRO-HYDRO 45400 93062 30500
BHIRA MSPGCL HYDRO-HYDRO 8000 10046 8400
TILLARI MSPGCL HYDRO-HYDRO 8900 10584 3100
SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 233298 20500
SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 87633 20500
PRIVATE SECTOR
Page 36
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 81282 46750
JNSTPP(JAYPEE NIGRIE) JP POWER VENTURES LTD THERMAL-COAL 132000 726695 29310
MB POWER MB POWER THERMAL-COAL 120000 345632 38310
ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 754922 28671
ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 780761 23495
ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 198000 1263784 32090
ADANI POWER MAHARA ADANI POWER LTD THERMAL-COAL 330000 1666191 34124
AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 170065 36827
SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 252035 45129
ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 458551 36000
ESSAR POWER MP LTD ESSAR POWER MP LTD THERMAL-COAL 60000 243040 28600
VEDANTA LTD (P P -I) VEDANTA LTD THERMAL-GAS 3000 15044 24000
VEDANTA LTD (P P -II) VEDANTA LTD THERMAL-GAS 3000 21293 24000
PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 8234600 24000
165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 5850 64390
145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 68717 40349
SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 132655 28776
SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 144686 38567
MUNDRA UMPPCOASTAL GUJARAT POWER
LTD THERMAL-IMP COAL 400000 2530300
23900
LANCO AMARKANTAK TPP PATHADIH
U-ILANCO AMARKAN POWER LTD THERMAL-COAL 30000 195500
29200
LANCO AMARKANTAK TPP PATHADIH
U-IILANCO AMARKAN POWER LTD THERMAL-COAL 30000 206900
27600
BARADARHA TPS D B POWER LTD THERMAL-COAL 120000 677373 29200
JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 405000 28900
JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 453000 40500
DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 339437 40700
TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 293400 44000
TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 137200 37000
TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 174900 44000
BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 92900 14100
BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23700 34300
KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 27600 48300
CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2530300 23900
BHANDARDRA HEP -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 2475 54900
SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 161400 26500
SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 445000 39000
SOTHERN REGION
CENTRAL SECTOR
NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 325699 54820
NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 305532 39880
NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 998805 38510
NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 113016 54070
NEYVELI TAMILNADU POWER LTD JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 625274 42200
VALLUR TPS NTPC TECL THERMAL-COAL 150000 856438 42350
R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 1493 84300
RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1502919 29400
RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 341291 31800
SIMHADRI I NTPC LTD THERMAL-COAL 100000 688382 36800
SIMHADRI II NTPC LTD THERMAL-COAL 100000 663657 43400
KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 593110 31324
MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 291625 21764
KKNPP-1 amp 2 NPCIL NUCLEAR-NUCLEAR 200000 572609 40948
MINICOY LAKSHADEEP THERMAL-DIESEL 340 770 29600
KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1097 29600
AMINI LAKSHADEEP THERMAL-DIESEL 265 509 29600
ANDROTT LAKSHADEEP THERMAL-DIESEL 219 524 29600
KALPENI LAKSHADEEP THERMAL-DIESEL 175 356 29600
AGATTI LAKSHADEEP THERMAL-DIESEL 195 658 29600
KADMAT LAKSHADEEP THERMAL-DIESEL 190 414 29600
KILTAN LAKSHADEEP THERMAL-DIESEL 150 269 29600
CHETLET LAKSHADEEP THERMAL-DIESEL 100 139 29600
BITRA LAKSHADEEP THERMAL-DIESEL 043 024 29600
BANGARAM LAKSHADEEP THERMAL-DIESEL 018 009 29600
Page 37
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) STATE SECTOR
Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 721811 46500
Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 50000 336142 46500
RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 237358 46500
RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 239926 46500
RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 124500 46500
SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 62109 46500
UPPER SILERU APGENCO HYDRO-HYDRO 24000 33000 46500
LOWER SILERU APGENCO HYDRO-HYDRO 46000 81066 46500
DONKARAI APGENCO HYDRO-HYDRO 2500 6007 46500
PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 1262 46500
CHETTIPETA APGENCO HYDRO-HYDRO 100 214 46500
MUCHKUND APGENCO HYDRO-HYDRO 12000 37571 46500
NAGARJUNASAGAR RCPH APGENCO HYDRO-HYDRO 9000 606 46500
TUNGABHADRA HES amp HAMPI(AP
Share)
APGENCO HYDRO-HYDRO 7200 6100 46500
KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 352232 42600
KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 288131 32500
KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 319272 46500
RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 40073 44300
KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 308317 46000
KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 308963 51300
SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 61004 76600
NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 17960 75300
PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 20873 58300
POCHAMPAD-I TSPGENCO HYDRO-HYDRO 2700 5455 29800
POCHAMPAD-II TSPGENCO HYDRO-HYDRO 900 1932 40700
NIZAMSAGAR TSPGENCO HYDRO-HYDRO 1000 1126 53400
RAICHUR TPS 1 to 7 KPCL THERMAL-COAL 147000 890866 43800
RAICHUR TPS 8 KPCL THERMAL-COAL 25000 159523 48200
BELLARI TPS 1 KPCL THERMAL-COAL 50000 318679 51100
BELLARI TPS 2 KPCL THERMAL-COAL 50000 232347 55600
BELLARI TPS 3 KPCL THERMAL-COAL 70000 47565 34400
BHADRA PH KPCL HYDRO-HYDRO 3920 2369 45900
GERUSUPPA PH KPCL HYDRO-HYDRO 24000 26990 22000
GHAT PRABHA HEP KPCL HYDRO-HYDRO 3200 4777 25300
KADRA HPS KPCL HYDRO-HYDRO 15000 16889 26800
NAGJHARI KPCL HYDRO-HYDRO 90000 155159 9800
KODASALLI DPH KPCL HYDRO-HYDRO 12000 14854 19200
MUNIRA+MGH+SPH+SPH KPCL HYDRO-HYDRO 22640 48211 7900
SHARAVATHY HPS KPCL HYDRO-HYDRO 108550 276215 5400
ALMATTI DPH KPCL HYDRO-HYDRO 29000 39611 24600
VARAHI UGPH KPCL HYDRO-HYDRO 46000 71368 15600
IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 17196 15300
IDUKKI HPS KSEB HYDRO-HYDRO 78000 137905 15300
KAKKAD HPS KSEB HYDRO-HYDRO 5000 13063 15300
KALLADA HPS KSEB HYDRO-HYDRO 1500 4436 15300
KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 46544 15300
KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 635 15300
LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 30822 15300
MALANKARA HPS KSEB HYDRO-HYDRO 1050 2474 15300
MATTUPETTY KSEB HYDRO-HYDRO 200 230 15300
MALAMPUZHA KSEB HYDRO-HYDRO 250 063 15300
CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 864 15300
URUMI ST I amp II KSEB HYDRO-HYDRO 615 903 15300
LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 248 15300
NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7765 19625 15300
PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 16601 15300
PANNIAR HPS KSEB HYDRO-HYDRO 3240 6217 15300
PORINGALKUTHU KSEB HYDRO-HYDRO 3600 10052 15300
PORINGALKUTHU LBE KSEB HYDRO-HYDRO 1600 9438 15300
PEPPARA KSEB HYDRO-HYDRO 300 395 15300
POOZHITHODE KSEB HYDRO-HYDRO 480 1045 15300
Page 38
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) PEECHI KSEB HYDRO-HYDRO 125 040 15300
RANI-PERUNADU KSEB HYDRO-HYDRO 400 585 15300
SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 79783 15300
SENGULAM HPS KSEB HYDRO-HYDRO 5120 11558 15300
SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 16711 15300
VILANGAD KSEB HYDRO-HYDRO 750 1578 15300
BARAPOLE KSEB HYDRO-HYDRO 1500 1932 15300
VELLATHOOVAL KSEB HYDRO-HYDRO 360 305 15300
CHIM0NY KSEB HYDRO-HYDRO 250 156 15300
ADYANPARA KSEB HYDRO-HYDRO 350 501 15300
BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 554 15300
KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 3801 15300
KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 23132 32800
ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 14416 62280
METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 523970 62280
METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 321270 62280
NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 336575 62280
NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 591240 62280
TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 508966 62280
KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 30897 62280
VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 18720 90699 62280
KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 33593 62280
BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 1047 62280
PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 1250 62280
PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 330 62280
MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 4897 62280
MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 032 62280
KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15681 62280
KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 40608 62280
KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 21342 62280
KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 4717 62280
KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4322 62280
KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2399 62280
METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 4416 62280
METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 8035 62280
BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2187 62280
BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2359 62280
BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2511 62280
BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 1949 62280
BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 1819 62280
POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 172 62280
SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 241 62280
MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 026 62280
THIRUMOORTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 136 62280
PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 9309 62280
VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 353 62280
SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 4192 62280
PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 6571 62280
SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 1186 62280
SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6319 62280
ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 6122 62280
KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 28674 62280
SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 18381 62280
SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 4258 62280
KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 12680 62280
KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4201 62280
ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 000 62280
PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 19175 62280
AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 078 62280
BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 504 62280
BHAVANI KATTALAI (BKB)(IIIampIII BB I amp II)TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 5847 62280
PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 000 62280
Page 39
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) SRI DAMODARAM STPS APPDCL THERMAL-COAL 160000 808108 36300
PRIVATE SECTOR
KARUPPUR TANJORE LANCO TANJORE PCL THERMAL-GAS 12000 48096 28770
SIMHAPURI ENERGY LTD SIMHAPURI ENERGY LTD THERMAL-COAL 60000 143900 39100
JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 7111 45500
SBU 1 JSW ENERGY LTD
VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 26000 159100
43300
SBU 2 JSW ENERGY LTD
VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 60000 247900
42800
LANCO KPLLANCO KONDAPALLI POWER
LTDTHERMAL-GAS 36814 85060
25776
LANCO KPL STG -IILANCO KONDAPALLI POWER
LTDTHERMAL-GAS 36600 12979
46330
LANCO KPL STG -IIIALANCO KONDAPALLI POWER
LTDTHERMAL-GAS 37100 85710
46330
LANCO KPL STG -III BLANCO KONDAPALLI POWER
LTDTHERMAL-GAS 37100 43639
46330
HINDUJA NATIONAL PCL HINDUJA NATIONAL PCL THERMAL-COAL 104000 303000 38200
MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 121164 49940
UDUPI POWER COR LTD ADANI POWER LTD THERMAL-COAL 120000 754613 42500
SPECTRUM POWER GENERATION
LTD SPECTRUM PG LTD THERMAL-GASN 20525 9256812
34952
TAQA NEYVELI POWER COM PVT
LTD TAQA NEYVELI THERMAL-LIG 25000 5840
34500
ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 251000 51000
ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 207860 36800
GMR VEMAGIRI POWER GENERATION
LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 30117
46450
EASTERN REGION
CENTRAL SECTOR
MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 64675 53113
MTPS STAGE - II KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 39000 1432 69138
BOKARO `B` TPS DVC THERMAL-COAL 63000 145670 31539
MEJIA TPS U 1-3 DVC THERMAL-COAL 63000 348298 31552
MEJIA TPS U 4 DVC THERMAL-COAL 21000 116099 34997
MEJIA TPS U 5-6 DVC THERMAL-COAL 50000 276427 35976
MEJIA TPS U 7-8 DVC THERMAL-COAL 100000 552854 36991
DURGAPUR STEEL TPS DVC THERMAL-COAL 100000 665550 39323
DURGAPUR TPS DVC THERMAL-COAL 21000 59270 35416
RAGHUNATHPUR TPS DVC THERMAL-COAL 120000 201650 35326
MAITHON HYDEL STA DVC HYDRO-HYDRO 6320 12200 17984
CHANDRAPURA TPSU1-3 DVC THERMAL-COAL 42000 257610 35095
CHANDRAPURA TPSU7-8 DVC THERMAL-COAL 50000 306673 34987
KODERMA TPS DVC THERMAL-COAL 100000 380180 38131
PANCHET HPS DVC HYDRO-HYDRO 8000 13360 17984
TILLAYA HPS DVC HYDRO-HYDRO 400 1410 17984
RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34700 35400
TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 277300 23200
TLDP -III NHPC LTD HYDRO-HYDRO 13200 55400 62000
TLDP -IV NHPC LTD HYDRO-HYDRO 16000 60300 25600
FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 957219 33700
FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 308943 41000
BONGAINGAON TPS NTPC LTD THERMAL-COAL 25000 153663 58600
KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 542277 34200
KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 942591 34200
BARH-II NTPC LTD THERMAL-COAL 132000 728021 44500
TALCHER TPS NTPC LTD THERMAL-COAL 46000 335521 30100
TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 702319 25600
TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1436521 24700
STATE SECTOR
BTPS(RampM) BIHAR STATE PGCL THERMAL-COAL 22000 12142 39700
BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 98331 10602
HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 50593 9482
CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 19689 2605
RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 53192 6033
UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 147208 14637
Page 40
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 60353 4519
IB TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 288567 25000
J P H GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 210 038 61100
MEYONG CHU GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 400 1086 61100
TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 122667 38200
DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 214339 43321
KOLAGHAT THERMAL POWER
STATION
WEST BENGAL PDCL THERMAL-COAL 126000 538269 31603
BAKRESHWAR THERMAL POWER
PLANT
WEST BENGAL PDCL THERMAL-COAL 105000 634876 32154
BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 45000 166855 33299
SANTHALDIH THERMAL POWER
STATION
WEST BENGAL PDCL THERMAL-COAL 50000 336442 34932
SAGARDIGHI THERMAL POWER
PROJECT
WEST BENGAL PDCL THERMAL-COAL 160000 423121 34705
JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 20344 68900
RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 24559 68900
TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 4623 68900
PURULIA PUMPED STORAGE
PROJECT
WEST BENGAL SEDCL HYDRO-HYDRO 90000 108816 68900
MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2768 68900
PRIVATE SECTOR
CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 49474 20230
CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 555500 70200
HALDIA ENERGY HALDIA ENERGY LTD THERMAL-COAL 60000 371000 50400
DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3688 63400
KAMALANGA TPS GMR KAMALANGA ENERGY LTD THERMAL-COAL 105000547670
33300
ADHUNIK POWER U-1 ADHUNIK POWER THERMAL-COAL 27000 158 44060
ADHUNIK POWER U-2 ADHUNIK POWER THERMAL-COAL 27000 168 44250
VL-JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 332800 23622
JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 43000 45250
JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 71700 37030
JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 70700 35920
JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 71100 38870
JOJOBERA UNIT 5 TATA POWER COM LTD THERMAL-COAL 12000 79300 44560
JOJOBERA UNIT 6 TATA POWER COM LTD THERMAL-WHR 12000 83700 12840
IEL KALINGANAGAR U-I TATA POWER COM LTD THERMAL-WG 6750 33400 22500
IEL KALINGANAGAR U-II TATA POWER COM LTD THERMAL-WG 6750 34800 22500
MAITHON UNIT 1 amp 2 TATA POWER COM LTD THERMAL-COAL 105000 678000 36100
HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 27500 24340
HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 28400 24340
HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 15800 24310
NORTH EASTERN REGION
CENTRAL SECTOR
LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 74100 36600
AGARTALA GT NEEPCO THERMAL-GAS 13500 88611 27210
ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 153111 32310
DOYANG HEP NEEPCO HYDRO-HYDRO 7500 25598 49801
KOPILI HEP NEEPCO HYDRO-HYDRO 20000 98186 11491
KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 19582 20237
KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 10310 17968
RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 124093 22945
TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 10100 17344 39000
STATE SECTOR
HYDRO POWER (122 Stns) ITANAGAR GOVT OF ARUNACHAL
PRADESHHYDRO-HYDRO 6971 6217270
24600
KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39514 17337
LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 82327 36810
NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 33318 48290
MYNTRIANG SHEP ST II ASSAM POWER GENCO HYDRO-HYDRO 300 567 35776
LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 9130 49200
LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 012 49200
DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 022 49200
TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 000 49200
UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 4990 16000
UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 6476 37000
UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 16494 14600
UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 3600 9556 15000
SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 758 8000
MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44070 44800
KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 154 41400
TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 091 41400
MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 411 41400
MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 394 41400
KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 760 41400
SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 3264 41400
LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 044 41400
BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 18953 28000
ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 43585 28200
GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 4080 11100
Note
LIG Lignite N Naptha WHR Waste Heat Recovery
Page 41
Voltage Level
+- 500 KV HVDC
+- 800 KV HVDC
765 KV
400 KV
220 KV
All India
Voltage Level
+- 500 KV HVDC
+- 800 KV HVDC
765 KV
400 kV
220 KV
All India
5
481 401
763 474
0 0
242 53
40 20
0 0
242 53
40 20
481 401
763 474
Transmission Lines Added duringApr-18 to Apr-18 ampApr-19 to Apr-19 (Ckms)
Apr-18 to Apr-18 Apr-19 to Apr-19
0 0
6 Transmission Lines Added during Apr-2019 (Ckms)
Apr-18 Apr-19
0 0
763
474
0
100
200
300
400
500
600
700
800
900
All India
Ckm
s
Apr-18 Apr-19
763
474
0
100
200
300
400
500
600
700
800
900
All India
Ckm
s
Apr-18 to Apr-18 Apr-19 to Apr-19
Voltage Level
+- 800 KV HVDC
+- 500 KV HVDC
765 KV
400 KV
220 KV
All India
Voltage Level
+- 800 KV HVDC
+- 500 KV HVDC
765 KV
400 KV
220 KV
All India
6
0 0
All India Transformation Capacity Addition during Apr-18 to Apr-18 amp Apr-19
to Apr-19 (MVA)
4600
0
500
2795
1305
5470
4000
185
1285
0
Apr-18 to Apr-18 Apr-19 to Apr-19
5470
0
500
4600
2795
1305
7 Transformation Capacity Addition During Apr-2019 (MVA)
0
4000
185
1285
0 0
Apr-18 Apr-19
5470
4600
4000
4200
4400
4600
4800
5000
5200
5400
5600
MV
A
Apr-18 Apr-19
5470 4600
0
74520
1
MV
A
Apr-18 to Apr-18 Apr-19 to Apr-19
Apr-2018 Apr-2019 Apr-2018 Apr-2019 Apr-2018 Apr-2019
Northern 28590 30094 28170 29786 -15 -10
Western 33235 34875 33233 34868 00 00
Southern 29211 31111 29166 31109 -02 00
Eastern 11752 12851 11650 12850 -09 00
North Eastern 1225 1300 1174 1228 -42 -55
All India 104013 110231 103393 109842 -06 -04
Apr-2018 Apr-2019 Apr-2018 Apr-2019 Apr-2018 Apr-2019
Northern 48824 54476 48367 53985 -09 -09
Western 50654 56242 50434 56222 -04 00
Southern 45946 49155 45684 49103 -06 -01
Eastern 21320 23349 21275 23349 -02 00
North Eastern 2600 2848 2552 2780 -18 -24
All India 162492 177411 161286 176810 -07 -03
Apr-2019 Figures are Provisional
7
8 Power Supply Position (Energy amp Peak) in Apr-2019
Peak Demand Peak Met
Requirement Availability
Energy (MU)Region
Surplus(+)
Deficit (-) in
Surplus(+)
Deficit (-) in Region
Power (MW)
Chandigarh Delhi Haryana HP JampK Punjab Rajasthan UP Utrakhand Apr-2018 0 0 0 0 546 0 0 247 0
Apr-2019 0 0 0 0 565 0 0 0 0
Chattisgarh Gujarat MP Maharashtra Daman amp Diu Dadar Nagar Goa
Apr-2018 13 11 3 99 0 0 0
Apr-2019 22 6 0 8 1 0 0
AP Telangana Karnataka Kerala Tamil Nadu Puducherry Lakshadweep
Apr-2018 22 0 2 0 0 20 0
Apr-2019 0 0 0 8 0 2 0
8
9 Peak Shortage of Power Supply (MW) in Different Regions in Apr-2019
0 0 0 0
565
0 0 0 00 0 0 0
546
0 0
247
0
0
400
800
Ch
an
dig
ar
h Delh
i
Ha
rya
na
HP
Jamp
K
Pu
nja
b
Ra
jasth
an
UP
Utr
akhan
d
MW
Northern States (MW) Apr-2019 Apr-2018
22
6 0 8 1 0 0
13
11
3
99
0 0 0
0
50
100
150
Ch
attis
gar
h
Guja
rat
MP
Mah
ara
shtr
a
Da
man amp
Diu
Da
dar
Na
gar G
oa
MW
Western States (MW) Apr-2019 Apr-2018
0 0 08
0 2 0
22
0 2 0 0
20
00
50
AP Telangana Karnataka Kerala Tamil Nadu Puducherry Lakshadweep
Southern State (MW) Apr-2019 Apr-2018
Bihar DVC Jharkhand Odisha West Bengal Sikkim AampN Island
Apr-2018 0 39 0 0 7 0 4
Apr-2019 0 0 0 0 0 0 4
Arunachal Assam Manipur Meghalaya Mizoram Nagaland Tripura
Apr-2018 5 30 7 0 9 29 4
Apr-2019 3 45 9 0 3 26 1
9
0 0 0 0 0 0
4
0
39
0 0
7
0
4
01020304050
Bih
ar
DV
C
Jha
rkh
an
d
Od
ish
a
We
st
Be
ng
al
Sik
kim
Aamp
NIs
land
MW
Eastern States (MW) Apr-2019 Apr-2018
3
45
9
0 3
26
1
5 7
0
9
29
4
0
10
20
30
40
50
Aru
na
cha
l
Assa
m
Ma
nip
ur
Me
gh
ala
ya
Miz
ora
m
Na
gala
nd
Trip
ura
MW
North-Eastern States (MW)
Sector Apr-2018 Apr-2019
Central 7634 7459
State 6438 6142
Private Sector IPP 5525 6005
Private Sector UTL 6815 6440
ALL INDIA 6454 6471
Month PLF 2018 PLF 2019
Jan 6215 6054
Feb 6230 6051
March 6452 6340
April 6454 6471
For Coal and Lignite based Power Plants and Provisional based on Actual-Cum-Assesment
10
PLF of Thermal Power Plants
(excluding gas based power plants)
All India PLF of Thermal Plants (Excluding Gas Based Plants) Month-wise
10 All India Thermal PLF Sector-wise (Excluding Gas Based Power Plants) for Apr-2019
5800
6000
6200
6400
6600
Jan Feb March April
Months
All India PLF Month-wise
PLF 2018 PLF 2019
7634
64385525
6815 6454
7459
6142 60056440 6471
000
2000
4000
6000
8000
10000
Central State Private Sector IPP Private Sector UTL ALL INDIA
All India Thermal PLF
Apr-2018 Apr-2019
2012-13 2013-14 2014-15 2015-16 2016-17 2017-18
TampD Losses 2304 2284 2277 2181 2142 2104
ATampC Losses 2548 2262 2572 2398 NA NA
Provisional
Note As per PFC for utilities selling directly to consumers NA- Not Available
Total Number of Villages
597464
Note From the year 2004-05 onwards Definition of Village Electrification-
A village would be declared Electrified if
Without
Subsidy
Gap ACS-
ARR(
Without
Subsidy)
Paiseunit
Gap ACS-
ARR (on
subsidy
booked
basis)
paiseunit
Gap ACS-
ARR (on
subsidyrece
ived basis)
paiseunit
2013-14 400 118 76 77
2014-15 412 108 58 60
Source- PFC Reports on the performance of State Power Utilities
2013-14 4894
2014-15 5304
2015-16 5459
2016-17 5743
2017-18 6080
2018-19 6289
11
11 T amp D and ATampC Losses ()
12 All India Village Electrification
Villiages Electrified (Nos)
10000All villages as per census 2011 has
been electrified on 28042018
Villages electrified
Average cost of supply(ACS)
(paiseunit)
i) Basic Infrastructure such as Distribution Transformer and Distribution lines are provided in the inhabited locality
as well as Dalit Basti hemlet where it exists (For electrification through Non-Conventional Energy Sources a
Distribution Transformer may not be necessary)
14 All India Coal consumption for Power Generation (MT)
520
Average Revenue Realization(paiseunit)
518
Year
ii) Electricity is provided to Public places like Schools Panchayat Office Health Centre Dispensaries Community
Centres etc and
iv) Mandatory Certification from Gram Panchayat regarding the completion of village electrification should be
obtained
13 Average cost of Power amp Average Realisation
iii) The number of households electrified should be at least 10 of the total number of households in the village
SN Contents Page
1 Capacity Addition Targets and Achievements in 12th Plan amp upto March2019 12
2 Capacity Addition Targets amp Achievements during Apr-2019 and Apr-19 to Apr-19 13
3 Installed Capacity in various Regions including their shares 14-19
Section B - Capacity Addition
(i) CAPACITY ADDTION TARGETS AND ACHIEVEMENTS IN THE 12TH PLAN Figures in MW
TARGET ACH TARGET ACH TARGET ACH TARGET ACH
CENTRAL 14878 15869 6004 2584 5300 2000 26182 20453
STATE 13922 22201 1608 2276 0 0 15530 24477
PRIVATE 43540 53661 3285 619 0 0 46825 54280
ALL INDIA 72340 91730 10897 5479 5300 2000 88537 99209
(ii) CAPACITY ADDITION TARGET AND ACHIEVEMENT FOR 2017-18 (IN MW)
THERMAL HYDRO NUCLEAR
TARGET ACH TARGET ACH TARGET ACH TARGET ACH
CENTRAL 4880 3170 800 390 500 6180 3560
STATE 3546 1760 300 200 0 3846 1960
PRIVATE 2940 3780 205 205 0 3145 3985
ALL INDIA 11366 8710 1305 795 500 0 13171 9505
(iii) CAPACITY ADDITION ACHIEVEMENT FOR 2018-19 (IN MW)
TARGET ACH TARGET ACH TARGET ACH TARGET ACH
CENTRAL 2760 1960 710 110 0 0 3470 2070
STATE 4506 2850 130 30 0 0 4636 2880
PRIVATE 0 972 0 0 0 0 0 972
ALL INDIA 7266 5782 840 140 0 0 8106 5922
12
SECTOR
SECTOR
TOTAL
TOTALNUCLEARHYDROTHERMAL
1 Capacity Addtion Targets and Achievements in the 12th Plan amp upto March2019
SECTORTHERMAL HYDRO NUCLEAR TOTAL
(MW)
Cummulative
Deviation
Target Achievement Target Achievement (+) (-)
Central 6040 500 0 500 0 -500
State 425615 660 0 660 0 -660
Private 0 0 0 0 0 0
Total 1029615 1160 0 1160 0 -1160
Central 600 0 0 0 0 0
State 21099 0 0 0 0 0
Private 379 0 0 0 0 0
Total 118999 0 0 0 0 0
Nuclear Central 700 0 0 0 0 0
Central 7340 500 0 500 0 -500
State 446714 660 0 660 0 -660
Private 379 0 0 0 0 0
Total 1218614 1160 0 1160 0 -1160
Electricity Generation (MU) Targets and Achievements for 2016-17
13
Hydro
All India
Capacity Addition TargetsAchievements during the Month of Apr-2019
Thermal
2 Capacity Addition Targets Achievements During Apr-2019
Schemes Sector
Target 2019-20
Apr-19 to Apr-19Apr-19
11
60
0 0
11
60
0 0 0 0
0
200
400
600
800
1000
1200
1400
Thermal Hydro Nuclear Total
MW
Targets and Achievement during 2019-20Target Achievement
0
200
400
600
800
1000
1200
Thermal Hydro Nuclear Total
1160
0 0
1160
0 0 00
MW
Target Achievement
Coal Lignite Gas Diesel Total
State 1634400 25000 287920 000 1947320 000 869755 69956 2887031
Private 2168083 108000 55800 000 2331883 000 251400 1312046 3895329
Central 1233537 25000 234406 000 1492943 162000 849622 37900 2542465
Sub Total 5036020 158000 578126 000 5772146 162000 1970777 1419902 9324825
State 2156000 104000 284982 000 2544982 000 544650 54789 3144421
Private 3474567 50000 467600 000 3992167 000 48100 2186476 6226743
Central 1650295 000 328067 000 1978362 184000 162000 66630 2390992
Sub Total 7280862 154000 1080649 000 8515511 184000 754750 2307894 11762155
State 1993250 000 79198 28788 2101236 000 1177483 58688 3337407
Private 1187450 25000 532210 27370 1772030 000 000 3749140 5521170
Central 1123502 289000 35958 000 1448460 332000 000 54190 1834650
Sub Total 4304202 314000 647366 56158 5321726 332000 1177483 3862018 10693227
State 624000 000 10000 000 634000 000 353792 27511 1015303
Private 638700 000 000 000 638700 000 39900 111637 790237
Central 1483664 000 000 000 1483664 000 100520 1000 1585184
Sub Total 2746364 000 10000 000 2756364 000 494212 140148 3390724
State 000 000 49771 3600 53371 000 42200 23325 118895
Private 000 000 2450 000 2450 000 000 6104 8554
Central 77002 000 125360 000 202362 000 100500 3000 305862
Sub Total 77002 000 177581 3600 258183 000 142700 32429 433311
State 000 000 000 4005 4005 000 000 525 4530
Private 000 000 000 000 000 000 000 738 738
Central 000 000 000 000 000 000 000 510 510
Sub Total 000 000 000 4005 4005 000 000 1773 5778
State 6407650 129000 711871 36393 7284913 000 2987880 234793 10507586
Private 7468800 183000 1058060 27370 8737230 000 339400 7366140 16442770
Central 5568000 314000 723791 000 6605791 678000 1212642 163230 8659663
Total 19444450 626000 2493722 63763 22627934 678000 4539922 7764163 35610019
Figures at decimal may not tally due to rounding off
Note -
(As per latest information available with MNRE)
Break up of RES all India as on 31032019 is given below (in MW)
459315 3562597 2818071 7764163
A 0 MW
B Apr 2019 0 MW
C
Apr 2019 0 MW
D Net Capacity Added during Apr 2019 A-B-C 0 MW
Sector wise breakup of RES capacity as shown is provisional
Share of installed capacity of BBMB Stations is included in state sector of partner states
BM PowerCogen Waste to Energy
910350 13830
Capacity Added during Apr 2019
Capacity Retired during
Capacity removed due to change
from Conventional to RES during
Islands
ALL INDIA
Abbreviation- SHP=Small Hydro Project (le 25 MW) BP=Biomass Power UampI=Urban amp Industrial Waste Power RES=Renewable Energy Sources
1 RES include SHP BP UampI Solar and Wind Energy Installed capacity in respect of RES (MNRE) as on 31032019
Small
Hydro PowerWind Power
Bio-PowerSolar Power
Total
Capacity
RES
(MNRE)
Northern Region
Western Region
Southern Region
Eastern Region
North Eastern
Region
ALL INDIA INSTALLED CAPACITY (IN MW) OF POWER STATIONS
(As on 30042019)
(UTILITIES)
Region Ownership Sector
Mode wise breakup
Grand TotalThermalNuclear Hydro
Coal Lignite Gas Diesel Total
State 13500 000 180040 000 193540 000 000 000 193540
Private 86922 000 10800 000 97722 000 000 17889 115611
Central 311272 000 20701 000 331973 10283 72309 000 414565
Sub-Total 411694 000 211541 000 623235 10283 72309 17889 723716
State 272000 000 15000 000 287000 000 110282 6930 404212
Private 408078 000 000 000 408078 000 20000 34512 462590
Central 129472 000 53561 000 183034 10094 66370181 500 259998
Sub-Total 809550 000 68561 000 878112 10094 196652 41942 1126799
State 000 000 000 000 000 000 69460 25661 95121
Private 000 000 000 000 000 000 99200 62668 161868
Central 18340 000 6201 000 24541 2895 122388 000 149824
Sub-Total 18340 000 6201 000 24541 2895 291048 88329 406813
State 000 000 17500 000 17500 000 123000 12903 153403
Private 000 000 000 000 000 000 000 6483 6483
Central 50639 000 12907 000 63547 6798 109188 000 179533
Sub-Total 50639 000 30407 000 81047 6798 232188 19386 339419
State 176000 000 15000 000 191000 000 259770 12780 463550
Private 511550 000 000 000 511550 000 28800 115462 655812
Central 85458 000 26401 000 111859 19681 92342 000 223882
Sub-Total 773008 000 41401 000 814409 19681 380912 128242 1343244
State 626000 25000 60380 000 711380 000 109618 2385 823383
Private 280200 108000 000 000 388200 000 10400 730181 1128781
Central 95625 25000 22110 000 142735 55674 73901 34400 306710
Sub-Total 1001825 158000 82490 000 1242315 55674 193919 766966 2258874
State 546900 000 000 000 546900 000 72410 2510 621820
Private 871433 000 000 000 871433 000 84200 288760 1244393
Central 379639 000 54949 000 434588 28948 180253 3000 646789
Sub-Total 1797972 000 54949 000 1852921 28948 336863 294270 2513002
State 000 000 000 000 000 000 125215 6787 132002
Private 9900 000 45000 000 54900 000 8800 52620 116320
Central 34324 000 6966 000 41290 3124 47554 000 91968
Sub-Total 44224 000 51966 000 96190 3124 181569 59407 340290
State 000 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 000 3471 3471
Central 3815 000 1503 000 5317 801 10171 000 16289
Sub-Total 3815 000 1503 000 5317 801 10171 3471 19760
124953 000 29105 000 154058 23703 75145 000 252907
State 1634400 25000 287920 000 1947320 000 869755 69956 2887031
Private 2168083 108000 55800 000 2331883 000 251400 1312046 3895329
Central 1233537 25000 234406 000 1492943 162000 849622 37900 2542465
Grand Total 5036020 158000 578126 000 5772146 162000 1970777 1419902 9324825
Delhi
Haryana
Himachal Pradesh
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
NORTHERN REGION
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
(As on 30042019)
State Ownership Sector
Mode wise breakup
Grand TotalThermalNuclear Hydro
RES
(MNRE)
Jammu amp Kashmir
Punjab
Rajasthan
Uttar Pradesh
Uttarakhand
Chandigarh
Central - Unallocated
Total (Northern
Region)
(As on 30042019)
Coal Lignite Gas Diesel Total
State 000 000 000 000 000 000 000 005 005
Private 000 000 4800 000 4800 000 000 392 5192
Central 46959 000 1967 000 48926 2600 000 000 51526
Sub-Total 46959 000 6767 000 53726 2600 000 397 56723
State 000 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 000 1447 1447
Central 14141 000 4334 000 18475 700 000 000 19175
Sub-Total 14141 000 4334 000 18475 700 000 1447 20622
State 371000 104000 217782 000 692782 000 77200 6470 776452
Private 726567 50000 396000 000 1172567 000 000 833180 2005747
Central 324243 000 42400 000 366643 55900 000 24330 446873
Sub-Total 1421810 154000 656182 000 2231992 55900 77200 863980 3229072
State 540000 000 000 000 540000 000 170366 8396 718762
Private 617400 000 10000 000 627400 000 000 418040 1045440
Central 334238 000 25700 000 359938 27300 152000 30000 569238
Sub-Total 1491638 000 35700 000 1527338 27300 322366 456436 2333440
State 228000 000 000 000 228000 000 12000 1105 241105
Private 885000 000 000 000 885000 000 000 52430 937430
Central 211075 000 000 000 211075 4800 10000 000 225875
Sub-Total 1324075 000 000 000 1324075 4800 22000 53535 1404410
State 1017000 000 67200 000 1084200 000 285084 38813 1408097
Private 1245600 000 56800 000 1302400 000 48100 880441 2230941
Central 466780 000 227273 000 694053 69000 000 12300 775353
Sub-Total 2729380 000 351273 000 3080653 69000 333184 931553 4414390
State 000 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 000 546 546
Central 19560 000 6634 000 26194 900 000 000 27094
Sub-Total 19560 000 6634 000 26194 900 000 546 27640
233300 000 19759 000 253059 22800 000 000 275859
State 2156000 104000 284982 000 2544982 000 544650 54789 3144421
Private 3474567 50000 467600 000 3992167 000 48100 2186476 6226743
Central 1650295 000 328067 000 1978362 184000 162000 66630 2390992
Grand Total 7280862 154000 1080649 000 8515511 184000 754750 2307894 11762155
Goa
Daman amp Diu
Gujarat
Madhya Pradesh
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
WESTERN REGION
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
ThermalNuclear Hydro
RES
(MNRE)
State Ownership Sector
Mode wise breakup
Grand Total
Chhattisgarh
Maharashtra
Dadra amp Nagar
Naveli
Central - Unallocated
Total (Western
Region)
(As on 30042019)
Coal Lignite Gas Diesel Total
State 501000 000 23540 000 524540 000 167360 5618 697518
Private 387388 000 381318 3680 772386 000 000 743342 1515728
Central 154683 12773 000 000 167456 12727 000 25000 205183
Sub-Total 1043071 12773 404858 3680 1464382 12727 167360 773960 2418429
State 558250 000 000 000 558250 000 247993 4122 810365
Private 83945 000 83182 000 167127 000 000 393644 560771
Central 180685 14927 000 000 195612 14873 000 1000 211485
Sub-Total 822880 14927 83182 000 920989 14873 247993 398766 1582621
State 502000 000 000 12792 514792 000 358660 19389 892841
Private 195850 000 000 2520 198370 000 000 1363591 1561961
Central 242780 40140 000 000 282920 69800 000 000 352720
Sub-Total 940630 40140 000 15312 996082 69800 358660 1382979 2807521
State 000 000 000 15996 15996 000 185650 17290 218936
Private 61500 000 17400 000 78900 000 000 19021 97921
Central 86142 28180 35958 000 150280 36200 000 5000 191480
Sub-Total 147642 28180 53358 15996 245176 36200 185650 41311 508337
State 432000 000 52408 000 484408 000 217820 12270 714498
Private 458767 25000 50310 21170 555247 000 000 1229228 1784475
Central 302532 136420 000 000 438952 144800 000 23190 606942
Sub-Total 1193299 161420 102718 21170 1478607 144800 217820 1264688 3105915
State 000 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 000 000 000
Central 000 10000 000 000 10000 000 000 000 10000
Sub-Total 000 10000 000 000 10000 000 000 000 10000
State 000 000 3250 000 3250 000 000 000 3250
Private 000 000 000 000 000 000 000 314 314
Central 14080 10760 000 000 24840 8600 000 000 33440
Sub-Total 14080 10760 3250 000 28090 8600 000 314 37004
142600 35800 000 000 178400 45000 000 000 223400
State 1993250 000 79198 28788 2101236 000 1177483 58688 3337407
Private 1187450 25000 532210 27370 1772030 000 000 3749140 5521170
Central 1123502 289000 35958 000 1448460 332000 000 54190 1834650
Grand Total 4304202 314000 647366 56158 5321726 332000 1177483 3862018 10693227
Kerala
Andhra Pradesh
Telangana
Karnataka
Total (Southern
Region)
Tamil Nadu
NLC
Puducherry
Central - Unallocated
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
SOUTHERN REGION
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
State Ownership Sector
Mode wise breakup
Grand TotalThermalNuclear Hydro
RES
(MNRE)
(As on 30042019)
Coal Lignite Gas Diesel Total
State 000 000 000 000 000 000 000 7070 7070
Private 28100 000 000 000 28100 000 000 25545 53645
Central 384933 000 000 000 384933 000 11000 000 395932
Sub-Total 413033 000 000 000 413033 000 11000 32615 456647
State 42000 000 000 000 42000 000 13000 405 55405
Private 73000 000 000 000 73000 000 000 3495 76495
Central 39374 000 000 000 39374 000 6100 000 45474
Sub-Total 154374 000 000 000 154374 000 19100 3900 177374
State 540000 000 10000 000 550000 000 98600 12195 660795
Private 243700 000 000 000 243700 000 000 35250 278950
Central 76077 000 000 000 76077 000 41000 000 117077
Sub-Total 859777 000 10000 000 869777 000 139600 47445 1056822
State 000 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 000 000 000
Central 698504 000 000 000 698504 000 18620 000 717124
Sub-Total 698504 000 000 000 698504 000 18620 000 717124
State 42000 000 000 000 42000 000 206192 2630 250822
Private 293900 000 000 000 293900 000 000 47346 341246
Central 163390 000 000 000 163390 000 8900 1000 173290
Sub-Total 499290 000 000 000 499290 000 215092 50976 765358
State 000 000 000 000 000 000 36000 5211 41211
Private 000 000 000 000 000 000 39900 001 39901
Central 8703 000 000 000 8703 000 6400 000 15103
Sub-Total 8703 000 000 000 8703 000 82300 5212 96215
112683 000 000 000 112683 000 8501 000 121184
State 624000 000 10000 000 634000 000 353792 27511 1015303
Private 638700 000 000 000 638700 000 39900 111637 790237
Central 1483664 000 000 000 1483664 000 100520 1000 1585184
Grand Total 2746364 000 10000 000 2756364 000 494212 140148 3390724
Total (Eastern
Region)
Bihar
Jharkhand
West Bengal
DVC
Odisha
Sikkim
Central - Unallocated
HydroOwnership Sector
Mode wise breakup
Grand TotalThermalNuclear
RES
(MNRE)
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
State
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
EASTERN REGION
(As on 30042019)
Coal Lignite Gas Diesel Total
State 000 000 32821 000 32821 000 10000 501 43322
Private 000 000 2450 000 2450 000 000 2650 5100
Central 40852 000 43556 000 84408 000 35708 2500 122616
Sub-Total 40852 000 78827 000 119679 000 45708 5651 171038
State 000 000 000 000 000 000 000 10711 10711
Private 000 000 000 000 000 000 000 2939 2939
Central 3705 000 4682 000 8387 000 11655 000 20042
Sub-Total 3705 000 4682 000 8387 000 11655 13650 33692
State 000 000 000 000 000 000 32200 3253 35453
Private 000 000 000 000 000 000 000 012 012
Central 4560 000 10969 000 15529 000 7227 000 22756
Sub-Total 4560 000 10969 000 15529 000 39427 3265 58221
State 000 000 16950 000 16950 000 000 1601 18551
Private 000 000 000 000 000 000 000 009 009
Central 5610 000 43695 000 49305 000 6849 500 56654
Sub-Total 5610 000 60645 000 66255 000 6849 2110 75214
State 000 000 000 3600 3600 000 000 545 4145
Private 000 000 000 000 000 000 000 344 344
Central 4710 000 7157 000 11867 000 9534 000 21401
Sub-Total 4710 000 7157 3600 15467 000 9534 889 25890
State 000 000 000 000 000 000 000 3067 3067
Private 000 000 000 000 000 000 000 100 100
Central 3210 000 4893 000 8103 000 5733 000 13836
Sub-Total 3210 000 4893 000 8103 000 5733 3167 17003
State 000 000 000 000 000 000 000 3647 3647
Private 000 000 000 000 000 000 000 050 050
Central 3105 000 4046 000 7151 000 9794 000 16945
Sub-Total 3105 000 4046 000 7151 000 9794 3697 20642
11250 000 6362 000 17612 000 14000 000 31612
State 000 000 49771 3600 53371 000 42200 23325 118895
Private 000 000 2450 000 2450 000 000 6104 8554
Central 77002 000 125360 000 202362 000 100500 3000 305862
Grand Total 77002 000 177581 3600 258183 000 142700 32429 433311
Assam
Arunachal Pradesh
Meghalaya
Tripura
Manipur
Nagaland
Mizoram
Central - Unallocated
Total (North-
Eastern Region)
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
NORTH-EASTERN REGION
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
State Ownership Sector
Mode wise breakup
Grand TotalThermalNuclear Hydro
RES
(MNRE)
(As on 30042019)
Coal Lignite Gas Diesel Total
State 000 000 000 4005 4005 000 000 525 4530
Private 000 000 000 000 000 000 000 663 663
Central 000 000 000 000 000 000 000 510 510
Sub-Total 000 000 000 4005 4005 000 000 1698 5703
State 000 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 000 075 075
Central 000 000 000 000 000 000 000 000 000
Sub-Total 000 000 000 000 000 000 000 075 075
State 000 000 000 4005 4005 000 000 525 4530
Private 000 000 000 000 000 000 000 738 738
Central 000 000 000 000 000 000 000 510 510
Grand Total 000 000 000 4005 4005 000 000 1773 5778
Andaman amp
Nicobar
Lakshadweep
Total (Islands)
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
ISLANDS
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
State Ownership Sector
Mode wise breakup
Grand TotalThermalNuclear Hydro
RES
(MNRE)
SrNo Contents Page
1 Executive summary of Target and Achievement of Transmission Lines during 2019-20
20(1)
2 List of Transmission Lines CommissionedReady for commissioning during Apr-2019 20(2)
Section C - Transmission Lines
1 Executive summary of Target and Achievement of Transmission Lines during 2019-20 As on 30-04-19
(All figures in circuit kms)
Ce
ntr
al S
ecto
r
Sta
te S
ecto
r
JV
Pri
va
te S
ecto
r
To
tal
Ce
ntr
al S
ecto
r
Sta
te S
ecto
r
JV
Pri
va
te S
ecto
r
To
tal
Ce
ntr
al S
ecto
r
Sta
te S
ecto
r
JV
Pri
va
te S
ecto
r
To
tal
Ce
ntr
al S
ecto
r
Sta
te S
ecto
r
JV
Pri
va
te S
ecto
r
To
tal
Ce
ntr
al S
ecto
r
Sta
te S
ecto
r
JV
Pri
va
te S
ecto
r
To
tal
Ce
ntr
al
Se
cto
r
Sta
te S
ec
tor
JV
Pri
va
te S
ec
tor
Gra
nd
To
tal
0 0 0 0 0 0 0 0 2727 958 2334 6019 2239 3416 1143 6798 781 10023 0 10804 5747 14397 3477 23621
Apr19 Programme 0 0 0 0 0 0 0 0 577 416 557 1550 60 890 203 1153 0 309 0 309 637 1615 760 3012
Achievement 0 0 0 0 0 0 0 0 53 0 0 53 0 20 0 20 0 401 0 401 53 421 0 474
Upto Apr-19 Programme 0 0 0 0 0 0 0 0 577 416 557 1550 60 890 203 1153 0 309 0 309 637 1615 760 3012
Achievement 0 0 0 0 0 0 0 0 53 0 0 53 0 20 0 20 0 401 0 401 53 421 0 474
20(1)
220 kV Grand Total 800 kV 500 kV
Programme 2019-20
Programme
Achievement
HVDC765 kV 400 kV
Line
1 2 3 4 5 6
1 400 Bhadla (PG) - Bhadla (RVPN) line DC PGCIL 53
53
2 400 LILO of one ckt Jhanor - Navsari at Vav Ss DC GETCO 20
3 220 Banda-Chitrakoot Line DC UPPTCL 226
4 220 Gorakhpur (PG)-Gola line DC UPPTCL 82
5 220 Hapur(765) - Faridnagar line SC UPPTCL 11
6 220 Kalikiri - Madanapalli line DC APTRANSCO 60
7 220LILO of Gr Noida -Noida Sec-129 at Noida
Sec-148DC UPPTCL 1
8 220LILO of one Ckt of Badshahpur Pali at Sec-
65 GurgaonDC HVPNL 3
9 220 Sultanpur-Sangipur LILO Section at Amethi DC UPPTCL 18
421
0
474
20(2)
Grand Total
2Transmission Lines (220 kV and above) CommissionedReady for commissioning During Apr-2019
Voltage
Level (kV)Name of Transmission Lines
Circuit
Type
Executing
Agency
CENTRAL SECTOR
Total of CENTRAL SECTOR
STATE SECTOR Sector
Total of STATE SECTOR
PRIVATE SECTOR
Total of PRIVATE SECTOR
SlNo
Length(CKm)
As on 30-04-19
SN Contents Page
1 Executive summary of Target and Achievement of Substations during 2019-20 21(1)
2Sub Stations (220 kV and above) commissionedready for commisssioning during Apr-
201921(2)
Section D - Sub Stations
1 Executive summary of Target and Achievement of Substations during 2019-2020 As on 30-04-19
(All figures in circuit MVA)
Ce
ntr
al S
ecto
r
Sta
te S
ecto
r
JV
Pri
va
te S
ecto
r
To
tal
Ce
ntr
al S
ecto
r
Sta
te S
ecto
r
JV
Pri
va
te S
ecto
r
To
tal
Ce
ntr
al S
ecto
r
Sta
te S
ecto
r
JV
Pri
va
te S
ecto
r
To
tal
Ce
ntr
al S
ecto
r
Sta
te S
ecto
r
JV
Pri
va
te S
ecto
r
To
tal
Ce
ntr
al S
ecto
r
Sta
te S
ecto
r
JV
Pri
va
te S
ecto
r
To
tal
Ce
ntr
al S
ec
tor
Sta
te S
ec
tor
JV
Pri
va
te S
ec
tor
Gra
nd
To
tal
3000 0 0 3000 0 0 0 0 18000 3000 6000 27000 5205 19665 4260 29130 800 21786 0 22586 27005 44451 10260 81716
Apr19 Programme 0 0 0 0 0 0 0 0 3000 0 3000 6000 0 1000 2000 3000 0 800 0 800 3000 1800 5000 9800
Achievement 0 0 0 0 0 0 0 0 500 0 0 500 815 1980 0 2795 0 1305 0 1305 1315 3285 0 4600
Upto Apr-19 Programme 0 0 0 0 0 0 0 0 3000 0 3000 6000 0 1000 2000 3000 0 800 0 800 3000 1800 5000 9800
Achievement 0 0 0 0 0 0 0 0 500 0 0 500 815 1980 0 2795 0 1305 0 1305 1315 3285 0 4600
21(1)
220 kV Grand Total 800 kV 500 kV
Programme 2019-20
Programme
Achievement
HVDC765 kV 400 kV
As on 30-04-19
Sl Voltage Ratio Capacity
No (kVkV) (MWMVA)
1 2 3 4 5
1 Bhadla SS (3x1500 3x500 MVA) 765400 PGCIL 500
2 Extn at Tumkur (Pavagada ) PS (2x500 MVA) 400220 PGCIL 500
3 Bongaigaon (2nd ICT) Ss 400220 PGCIL 315
Total of CENTRAL SECTOR 1315
4 Motiram Adda Gorakhpur (Aug) (Additional TF) 400220 UPPTCL 240
5 Muradnagar-II Ghaziabad (Aug) (Additional TF) 400220 UPPTCL 240
6 Noida Sec- 148 GBNagar (New) 400220 UPPTCL 5007 Sarnath Varanasi (Aug) TF- II (500-315) 400220 UPPTCL 1858 Sarojininagar Lucknow Aug) TF- II (500-315) 400220 UPPTCL 185
9 Unnao (Aug) TF-III 400220 UPPTCL 31510 Nawada SS 400220 HVPNL 31511 Kharepatan SS 22033 MSETCL 2512 Prathipadu SS 220132 APTRANSCO 10013 Pali Ss 22066 HVPNL 160
14 A-5 Faridabad Ss 22066 HVPNL 60
15 Rentachintala Ss Aug(3X100-2x100) 220132 APTRANSCO 10016 Amethi Ss 220132 UPPTCL 160
17 Gajokhar Varanasi (Aug) TF- II (160-100) 220132 UPPTCL 60
18 Gola Gorakhpur (New) 220132 UPPTCL 160
19 Khurja Bulandshahr (Aug) TF- II (200-160) 220132 UPPTCL 40
20 RC Green GB Nagar (Aug) TF-II (160-100) 220132 UPPTCL 60
21 Sikandrabad Bulandshahr (Aug) (Additional TF) 220132 UPPTCL 160
22 Sitapur (Aug) (Additional TF) 220132 UPPTCL 160
23 Sohawal Ayodhya (Aug) TF-II (160-100) 220132 UPPTCL 60
TOTAL STATE SECTOR 3285
GRAND TOTAL 4600
21(2)
CENTRAL SECTOR
STATE SECTOR
2Sub-Stations (220 kV and above) CommissionedReady for commissioning During Apr-2019
Name of Sub Stations Executing Agency
SN Contents Page
1 Electricity Generation (MU) Targets and Achievements for 2019-20 22
Section E - Electricity Generation
Programme Achievement Ach Programme Achievement Ach
Central Sector 37545100 3177900 3129530 9848 3177900 3129530 9848
State Sector 37498600 3322500 2950558 8881 3322500 2950558 8881
PvtIPP Sector 37346200 3236400 3195940 9875 3236400 3195940 9875
PvtUTL Sector 1823100 159300 165579 10394 159300 165579 10394
Total 114213000 9896100 9441607 9541 9896100 9441607 9541
Central Sector 5661700 386100 481390 12468 386100 481390 12468
State Sector 6680500 498200 536514 10769 498200 536514 10769
PvtIPP Sector 1206900 57300 80405 14032 57300 80405 14032
PvtUTL Sector 144100 12300 10930 8886 12300 10930 8886
Total 13693200 953900 1109239 11628 953900 1109239 11628
Central Sector 4472000 367300 317765 8651 367300 317765 8651
Total 4472000 367300 317765 8651 367300 317765 8651
Bhutan Import 621800 17500 24396 13941 17500 24396 13941
Central Sector 47678800 3931300 3928685 9993 3931300 3928685 9993
State Sector 44179100 3820700 3487072 9127 3820700 3487072 9127
Pvt Sector 40520300 3465300 3452854 9964 3465300 3452854 9964
Total 133000000 11234800 10893007 9696 11234800 10893007 9696
Provisional based on actual-cum-Assesment
Figs in MU
Cummulative
Achievement
Cummulative
Achievement
Mar-19 Mar-18 Upto Mar-2019 Upto Mar-2018
984785 869291 12675910 10183949
22
1 Electricity Generation (MU) Targets and Achievememts for 2019-20
All India Energy Generation During Apr-19 to Apr-19 (MU)
Target (2019-20)Apr-19 to Apr-19
Sector
Hydro
Thermal
Nuclear
Renewable Energy Generation
Achievement
Apr-2019
98961
95393673
112348
94416
11092
3178
108930
0
20000
40000
60000
80000
100000
120000
Thermal Hydro Nuclear Total
Programme
Achievement
SN Contents Page
1 Energy Power Supply Position (Provisional) for Apr-2019 and during Apr-19 to Apr-19 23
2 Peak Power Supply Position (Provisional) for Apr-2019 and during Apr-19 to Apr-19 24
3 Energy Power Supply Position (Revised) for Mar-2019 and during Apr-19 to Mar-19 25
4 Peak Power Supply Position (Revised) for Mar-2019 and during Apr-19 to Mar-19 26
5 Notified Power cuts Restrictions on Industries during Apr-2019 27
6 Power Supply to Agricultural Sector during Apr-2019 28
Section F - Power supply position
आकड़ मममलयन यननट नट Figures in MU net
ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied
कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )
चडीगढ़ Chandigarh 117 117 0 00 117 117 0 00
दिलली Delhi 2698 2698 1 00 2698 2698 1 00
हरियजणज Haryana 3773 3773 0 00 3773 3773 0 00
दहमजचल परिश Himachal Pradesh 777 777 0 00 777 777 0 00
रमम कशमीि Jammu amp Kashmir 1604 1296 308 192 1604 1296 308 192
परजब Punjab 3646 3646 0 00 3646 3646 0 00
िजरसथजन Rajasthan 6210 6208 2 00 6210 6208 2 00
उतति परिश Uttar Pradesh 10179 10148 32 03 10179 10148 32 03
उततिजखड Uttarakhand 1120 1120 0 00 1120 1120 0 00
उततरी कषतर Northern Region 30094 29786 308 10 30094 29786 308 10
छततीसगढ़ Chhattisgarh 2684 2676 8 03 2684 2676 8 03
गरिजत Gujarat 10718 10718 0 00 10718 10718 0 00
मधय परिश Madhya Pradesh 6006 6006 0 00 6006 6006 0 00
महजिजषटर Maharashtra 14308 14308 0 00 14308 14308 0 00
िमन औि दिउ Daman amp Diu 220 220 0 00 220 220 0 00
िजिि व नगि हवली Dadra amp Nagar Haveli 552 552 0 00 552 552 0 00
गोवज Goa 388 388 0 00 388 388 0 00
पशचिमी कषतर Western Region 34875 34868 8 00 34875 34868 8 00
आनधर परिश Andhra Pradesh 5708 5708 0 00 5708 5708 0 00
तलगजनज Telangana 5725 5725 0 00 5725 5725 0 00
कनजाटक Karnataka 7003 7003 0 00 7003 7003 0 00
किल Kerala 2402 2400 2 01 2402 2400 2 01
तममल नजड Tamil Nadu 10010 10010 0 00 10010 10010 0 00
पडचिी Puducherry 263 263 0 00 263 263 0 00
लकष-दवीप Lakshadweep 4 4 0 0 4 4 0 0
दकषकषणी कषतर Southern Region 31111 31109 2 00 31111 31109 2 00
बबहजि Bihar 2589 2589 0 00 2589 2589 0 00
िजमोिि घजटी ननगम DVC 1772 1772 0 00 1772 1772 0 00
झजिखणड Jharkhand 689 689 0 00 689 689 0 00
ओडडशज Odisha 2689 2689 1 00 2689 2689 1 00
पशशचम बगजल West Bengal 5075 5075 0 00 5075 5075 0 00
मसशककम Sikkim 37 37 0 00 37 37 0 00
अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 7 29 27 2 7
परवी कषतर Eastern Region 12851 12850 1 00 12851 12850 1 00
अरणजचल परिश Arunachal Pradesh 66 66 0 05 66 66 0 05
असम Assam 766 709 57 75 766 709 57 75
मणणपि Manipur 68 67 1 15 68 67 1 15
मघजलय Meghalaya 170 160 10 59 170 160 10 59
ममज़ोिम Mizoram 54 53 0 08 54 53 0 08
नजगजलड Nagaland 54 54 0 08 54 54 0 08
बिपिज Tripura 122 120 1 12 122 120 1 12
उततर-परवी कषतर North-Eastern Region 1300 1228 71 55 1300 1228 71 55
समपणण भारत All India 110231 109842 389 04 110231 109842 389 04
23
ऊरजा पनत ा म कमी ऊरजा पनत ा म कमीEnergy not Supplied
Excludes energy exported to Bangladesh
Energy not Supplied
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
ऊराण वरवदयत आपरत ण शथिरत ररपोरण (परवाणरवलोकन) Energy Power Supply Position Report (Provisional)
राजयState
अपरल 2019 April2019 अपरल2019 -अपरल2019 April2019 to April2019
अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met
कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )
चडीगढ़ Chandigarh 256 256 0 00 256 256 0 00
दिलली Delhi 5664 5664 0 00 5664 5664 0 00
हरियजणज Haryana 8127 8127 0 00 8127 8127 0 00
दहमजचल परिश Himachal Pradesh 1387 1387 0 00 1387 1387 0 00
रमम कशमीि Jammu amp Kashmir 2826 2261 565 200 2826 2261 565 200
परजब Punjab 7015 7015 0 00 7015 7015 0 00
िजरसथजन Rajasthan 10560 10560 0 00 10560 10560 0 00
उतति परिश Uttar Pradesh 19935 19935 0 00 19935 19935 0 00
उततिजखड Uttarakhand 1922 1922 0 00 1922 1922 0 00
उततरी कषतर Northern Region 54476 53985 491 09 54476 53985 491 09
छततीसगढ़ Chhattisgarh 4596 4574 22 05 4596 4574 22 05
गरिजत Gujarat 17871 17865 6 00 17871 17865 6 00
मधय परिश Madhya Pradesh 10018 10018 0 00 10018 10018 0 00
महजिजषटर Maharashtra 23158 23150 8 00 23158 23150 8 00
िमन औि दिउ Daman amp Diu 341 340 1 02 341 340 1 02
िजिि व नगि हवली Dadra amp Nagar Haveli 818 818 0 00 818 818 0 00
गोवज Goa 594 594 0 00 594 594 0 00
पशचिमी कषतर Western Region 56242 56222 20 00 56242 56222 20 00
आनधर परिश Andhra Pradesh 9151 9151 0 00 9151 9151 0 00
तलगजनज Telangana 10191 10191 0 00 10191 10191 0 00
कनजाटक Karnataka 12681 12681 0 00 12681 12681 0 00
किल Kerala 4309 4300 8 02 4309 4300 8 02
तममल नजड Tamil Nadu 15972 15972 0 00 15972 15972 0 00
पडचिी Puducherry 482 480 2 05 482 480 2 05
लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0
दकषकषणी कषतर Southern Region 49155 49103 52 01 49155 49103 52 01
बबहजि Bihar 5357 5357 0 00 5357 5357 0 00
िजमोिि घजटी ननगम DVC 3039 3039 0 00 3039 3039 0 00
झजिखणड Jharkhand 1266 1266 0 00 1266 1266 0 00
ओडडशज Odisha 5389 5389 0 00 5389 5389 0 00
पशशचम बगजल West Bengal 8666 8666 0 00 8666 8666 0 00
मसशककम Sikkim 100 100 0 00 100 100 0 00
अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7
परवी कषतर Eastern Region 23349 23349 0 00 23349 23349 0 00
अरणजचल परिश Arunachal Pradesh 139 136 3 22 139 136 3 22
असम Assam 1712 1667 45 26 1712 1667 45 26
मणणपि Manipur 197 188 9 46 197 188 9 46
मघजलय Meghalaya 336 336 0 00 336 336 0 00
ममज़ोिम Mizoram 116 113 3 26 116 113 3 26
नजगजलड Nagaland 157 131 26 166 157 131 26 166
बिपिज Tripura 292 291 1 03 292 291 1 03
उततर-परवी कषतर North-Eastern Region 2848 2780 68 24 2848 2780 68 24
समपणण भारत All India 177411 176810 601 03 177411 176810 601 03
24
मजग की पनत ा म कमी Demand not Met
Excludes the supply to Bangladesh
राजयStateअपरल 2019 April2019
मजग की पनत ा म कमी Demand not Met
अधिकतम वरवदयत आपरत ण शथिरत ररपोरण (परवाणरवलोकन) Peak Power Supply Position Report (Provisional)
आकड़ मगज वजट नट Figures in MW netअपरल2019 -अपरल2019 April2019 to April2019
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
आकड़ मममलयन यननट नट Figures in MU net
ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied
कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )
चडीगढ़ Chandigarh 96 96 0 00 1561 1561 0 00
दिलली Delhi 1931 1930 1 00 32299 32282 17 01
हरियजणज Haryana 3658 3658 0 00 53665 53665 0 00
दहमजचल परिश Himachal Pradesh 832 830 2 02 9850 9618 232 24
रमम कशमीि Jammu amp Kashmir 1767 1414 353 200 19593 15868 3725 190
परजब Punjab 3585 3585 0 00 55288 55275 13 00
िजरसथजन Rajasthan 6774 6770 4 01 79826 79637 189 02
उतति परिश Uttar Pradesh 8754 8691 63 07 117101 116118 984 08
उततिजखड Uttarakhand 1067 1067 0 00 13845 13753 92 07
उततरी कषतर Northern Region 28464 28041 423 15 383028 377776 5251 14
छततीसगढ़ Chhattisgarh 2464 2457 8 03 26130 26076 54 02
गरिजत Gujarat 9890 9890 0 00 116588 116572 15 00
मधय परिश Madhya Pradesh 6236 6236 0 00 75667 75665 2 00
महजिजषटर Maharashtra 13631 13631 0 00 158285 158148 137 01
िमन औि दिउ Daman amp Diu 221 221 0 00 2557 2557 0 00
िजिि व नगि हवली Dadra amp Nagar Haveli 553 553 0 00 6317 6317 0 00
गोवज Goa 362 362 0 00 4283 4280 3 01
पशचिमी कषतर Western Region 33357 33349 8 00 389827 389615 212 01
आनधर परिश Andhra Pradesh 6072 6071 1 00 63735 63677 58 01
तलगजनज Telangana 6930 6929 1 00 66697 66635 62 01
कनजाटक Karnataka 7614 7612 1 00 71759 71690 69 01
किल Kerala 2489 2488 1 00 25029 24911 118 05
तममल नजड Tamil Nadu 10247 10245 2 00 109375 109273 102 01
पडचिी Puducherry 252 251 1 04 2761 2751 10 03
लकष-दवीप Lakshadweep 4 4 0 0 46 46 0 0
दकषकषणी कषतर Southern Region 33605 33597 8 00 339355 338938 417 01
बबहजि Bihar 2319 2318 1 00 30052 29827 225 07
िजमोिि घजटी ननगम DVC 1773 1772 1 00 22365 21995 369 17
झजिखणड Jharkhand 698 697 1 01 8682 8461 221 25
ओडडशज Odisha 2583 2582 1 00 31810 31781 30 01
पशशचम बगजल West Bengal 4585 4584 2 00 52237 52078 159 03
मसशककम Sikkim 41 41 0 00 513 512 0 01
अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 67 346 323 23 67
परवी कषतर Eastern Region 11999 11995 5 00 145658 144654 1004 07
अरणजचल परिश Arunachal Pradesh 61 60 0 06 864 855 9 10
असम Assam 680 656 23 34 9532 9204 328 34
मणणपि Manipur 68 68 1 09 916 906 10 11
मघजलय Meghalaya 173 173 0 03 1955 1953 1 01
ममज़ोिम Mizoram 50 49 0 09 668 661 8 12
नजगजलड Nagaland 58 57 1 20 902 809 93 103
बिपिज Tripura 150 150 0 00 1859 1837 21 11
उततर-परवी कषतर North-Eastern Region 1240 1214 26 21 16696 16225 471 28
समपणण भारत All India 108665 108196 469 04 1274564 1267209 7355 06
Note The revised data for March 2019 is not avaliable
Excludes energy exported to Bangladesh
राजयState
ऊराण वरवदयत आपरत ण शथिरत ररपोरण (परवाणरवलोकन) Energy Power Supply Position Report (Provisional)
25
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
Energy not Supplied Energy not Supplied
मािण2019 March2019 अपरल2018 -मािण2019 April2018 to March2019
ऊरजा पनत ा म कमी ऊरजा पनत ा म कमी
अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met
कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )
चडीगढ़ Chandigarh 223 223 0 00 369 369 0 00
दिलली Delhi 4016 4016 0 00 7016 7016 0 00
हरियजणज Haryana 6544 6544 0 00 10270 10270 0 00
दहमजचल परिश Himachal Pradesh 1683 1683 0 00 1700 1700 0 00
रमम कशमीि Jammu amp Kashmir 3277 2622 655 200 3277 2622 655 200
परजब Punjab 6564 6564 0 00 12638 12638 0 00
िजरसथजन Rajasthan 11885 11885 0 00 13276 13276 0 00
उतति परिश Uttar Pradesh 16220 16220 0 00 20498 20062 436 21
उततिजखड Uttarakhand 2002 2002 0 00 2216 2216 0 00
उततरी कषतर Northern Region 47925 47356 569 12 63166 61726 1440 23
छततीसगढ़ Chhattisgarh 4444 4128 316 71 4444 4270 174 39
गरिजत Gujarat 16263 16263 0 00 17053 16963 90 05
मधय परिश Madhya Pradesh 12328 12323 5 00 13815 13815 0 00
महजिजषटर Maharashtra 22361 22291 70 03 23864 23254 610 26
िमन औि दिउ Daman amp Diu 336 336 0 01 357 356 1 02
िजिि व नगि हवली Dadra amp Nagar Haveli 800 799 1 01 816 815 1 01
गोवज Goa 538 538 0 00 596 596 0 00
पशचिमी कषतर Western Region 53132 52965 167 03 56675 55821 853 15
आनधर परिश Andhra Pradesh 8977 8977 0 00 9459 9453 6 01
तलगजनज Telangana 10471 10471 0 00 10815 10815 0 00
कनजाटक Karnataka 12841 12841 0 00 12841 12841 0 00
किल Kerala 4264 4228 36 09 4264 4228 36 09
तममल नजड Tamil Nadu 15712 15712 0 00 15712 15712 0 00
पडचिी Puducherry 427 412 15 34 427 412 15 34
लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0
दकषकषणी कषतर Southern Region 49464 49464 0 00 49464 49464 0 00
बबहजि Bihar 4633 4633 0 00 5115 5084 31 06
िजमोिि घजटी ननगम DVC 3035 3035 0 00 3035 3035 0 00
झजिखणड Jharkhand 1210 1210 0 00 1339 1291 48 36
ओडडशज Odisha 4827 4827 0 00 5357 5357 0 00
पशशचम बगजल West Bengal 8287 8287 0 00 9130 9123 7 01
मसशककम Sikkim 100 100 0 00 106 106 0 00
अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7
परवी कषतर Eastern Region 21658 21658 0 00 23141 22733 408 18
अरणजचल परिश Arunachal Pradesh 133 131 2 15 138 138 0 01
असम Assam 1539 1508 31 20 1865 1809 56 30
मणणपि Manipur 204 199 5 25 219 216 3 12
मघजलय Meghalaya 357 357 0 00 374 372 1 04
ममज़ोिम Mizoram 108 105 3 28 121 119 2 17
नजगजलड Nagaland 127 125 2 16 156 138 18 116
बिपिज Tripura 249 249 0 00 298 293 5 17
उततर-परवी कषतर North-Eastern Region 2540 2535 5 02 2967 2850 117 39
समपणण भारत All India 169464 168745 719 04 177022 175528 1494 08
Note The revised data for March 2019 is not avaliable 26
अधिकतम वरवदयत आपरत ण शथिरत ररपोरण (परवाणरवलोकन) Peak Power Supply Position Report (Provisional)
आकड़ मगज वजट नट Figures in MW net
राजयStateमािण2019 March2019 अपरल2018 -मािण2019 April2018 to March2019
मजग की पनत ा म कमी मजग की पनत ा म कमी Demand not MetDemand not Met
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
Excludes the supply to Bangladesh
अपरल 2019 April2019 अपरल2018 -मािण2019 April2019 to April2019
उततरी कषतर Northern Region
चडीगढ़ Chandigarh(Data Not Received)दिलली Delhi
हरियजणज Haryana
दहमजचल परिश Himachal Pradeshरमम कशमीि Jammu amp Kashmir(Data
Not Received)परजब Punjab
िजरसथजन Rajasthanउतति परिश Uttar Pradesh
उततिजखड Uttarakhand
पशचिमी कषतर Western Region
छततीसगढ़ Chhattisgarh
Apr-Nov 2018- No cuts
Maximum Demand cut-58MW
Energy cut- 00020-00032 MUsday
गरिजत Gujarat
मधय परिश Madhya Pradesh
महजिजषटर Maharashtra
गोवज Goa
दकषकषणी कषतर Southern Region
आनधर परिश Andhra Pradesh
तलगजनज Telangana
कनजाटक Karnataka
किल Kerala
तममल नजड Tamil Nadu
पडचिी Puducherryपरवी कषतर Eastern Region
बबहजि Bihar
झजिखणड Jharkhand
ओडडशज Odisha
पशशचम बगजल West Bengal
No N
otifie
d Cu
ts
27
मािण 2019 म इडथरीर पर वरवदयत करौती का वरवरवरण Notified Power CutsRestrictions on Industries during April2019
राजय कषतर State Regionऊराणमाग करौती EnergyDemand Cut
No N
otifie
d Cu
tsNo
Notifie
d Cu
ts
अपरल2019 April 2019 अपरल2019 -अपरल2019 April2019 to April2019
उततरी कषतर Northern Region
चडीगढ़ Chandigarh Data not received Data not received
दिलली Delhi Data not received Data not received
हरियजणज Haryana 0811 hrsday 0811 hrsday
दहमजचल परिश Himachal Pradesh HPSEBL has only 2 agriculture consumers and uninterrupted
power is being supplied to agriculture sector
HPSEBL has only 2 agriculture consumers and uninterrupted
power is being supplied to agriculture sector
रमम कशमीि Jammu amp Kashmir Data not received Data not received
परजब Punjab 379 hrsday 379 hrsday
िजरसथजन Rajasthan 0630 hrsday 0630 hrsday
उतति परिश Uttar Pradesh 2157 hrsday 2157 hrsday
उततिजखड Uttarakhand 2359 hrsday 2359 hrsday
पशचिमी कषतर Western Region
छततीसगढ़ Chhattisgarh 18 hrsday 18 hrsday
गरिजत Gujarat 8 hrsday 8 hrsday
मधय परिश Madhya Pradesh Three-Phase Supply(Irrigation)- 0953 hrs day Three-Phase
(Mixed) Supply - 2334 hrs day
Three-Phase Supply(Irrigation)- 0953 hrs day Three-Phase
(Mixed) Supply - 2334 hrs day
महजिजषटर Maharashtra Three-Phase Supply(Irrigation)- 9 hrs day Three-Phase Supply(Irrigation)- 9 hrs day
गोवज Goa No restriction No restriction
दकषकषणी कषतर Southern Region
आनधर परिश Andhra Pradesh 07 hrsday 07 hrsday
तलगजनज Telangana 24 hrsday 24 hrsday
कनजाटक Karnataka 6 hrsday 6 hrsday
किल Kerala No Restrictions No Restrictions
तममल नजड Tamil Nadu 9 hrsday (6 hrs during day time and 3 hrs during night time) 9 hrsday (6 hrs during day time and 3 hrs during night time)
पडचिी Puducherry No Restrictions No Restrictions
परवी कषतर Eastern Region
बबहजि Bihar 18 hrsday 18 hrsday
झजिखणड Jharkhand 20 hrsday 20 hrsday
ओडडशज Odisha 24 hrsday 24 hrsday
पशशचम बगजल West Bengal 23 hrsday 23 hrsday
28
मारच 2019 कषि कषतर को षिदयत आपरतच का षििरण Power Supply to Agricultural Sector during March2019
राजय कषतर State Regionऔसत वरवदयत आपरत ण घनरो म Average Hours of Supply
On segregated feeders
SNo Contents Page
1 Growth of Installed Capacity since 6th Plan 29
2 Progress of Transmission Sector since 6th Plan 30
3 All India Yearly Coal consumption for Power Generation (Utilities)
4 All India Annual Per Capita Consumption of Electricity since -2006
5 Average cost of power supply amp Average realisation (Paisakwh)
6 Growth of Rural Electrification amp Pump Sets Energisation
7 Status of Hydro Schemes Cleared by the CEA in Apr-2019
Section G - Growth of Power Sector
31
32
(In MW)
Coal Gas Diesel Total
End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472
End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634
End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537
End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596
End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921
End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703
End of 12th Plan 19216288 2532938 83763 21832988 6780 4447842 50018 31960630
Up to Apr-2019 20070450 2493722 63763 22627934 678000 4539922 7764163 35610019
Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-17) = 51529 MW
Electricity Generation (MU) Targets and Achievements for 2016-17
Coal Gas Diesel Nuclear Hydro Res Total
2007045 2493722 637629 678000 453992 77641625 22925174
29
1 Growth of Installed Capacity Since 6th Plan
Plan YearThermal
Nuclear Hydro RES (MNRE) Total
2007045
2493722637629
678000
4539922
77641625
Total Installed Capacity 35610019 MW
Coal Gas Diesel Nuclear Hydro Res
Progress of Transmission Sector in the Country up to April 2019
1 TRANSMISSION LINES (All fig in CKM)
At the end of
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
6th plan 0 0 0 0 0 0 0 0 0 0 0 0 1831 4198 0 6029 1641 44364 0 46005 3472 48562 0 52034
7th plan 0 0 0 0 0 0 0 0 0 0 0 0 13068 6756 0 19824 4560 55071 0 59631 17628 61827 0 79455
8th plan 0 0 0 0 1634 0 0 1634 0 0 0 0 23001 13141 0 36142 6564 73036 0 79600 31199 86177 0 117376
9th plan 0 0 0 0 3234 1504 0 4738 751 409 0 1160 29345 20033 0 49378 8687 88306 0 96993 42017 110252 0 152269
10th plan 0 0 0 0 4368 1504 0 5872 1775 409 0 2184 48708 24730 0 73438 9444 105185 0 114629 64295 131828 0 196123
11th Plan 0 0 0 0 5948 1504 1980 9432 4839 411 0 5250 71023 30191 5605 106819 10140 125010 830 135980 91950 157116 8415 257481
12th Plan 6124 0 0 6124 5948 1504 1980 9432 25465 1177 4598 31240 92482 48240 17065 157787 11014 151276 978 163268 141033 202197 24621 367851
13th Plan (Up
to Mar2019)6124 0 0 6124 5948 1504 1980 9432 33692 1512 6605 41809 101335 58238 21173 180746 11734 162552 1010 175296 158833 223806 30768 413407
13th Plan (Up
to Apr-19)6124 0 0 6124 5948 1504 1980 9432 33745 1512 6605 41862 101335 58258 21173 180766 11734 162953 1010 175697 158886 224227 30768 413881
27150 600 MW of 132 kV Inter-Regional power transmission capacity links which are operated radially from time to time is not added in the total
75050
47900
24000
99050
30
Grand Total
Note - The figure upto the end of 10th plan in for stringing progress including the lines not commissioned Now only commissioned lines are reckoned Accordingly the figure for 10th plan (end) may read
as 187555 after adjusting with (-) 10852 Ckm
Inter-regional Power Transfer Capacity (MW)
plusmn 800 kV HVDC plusmn 500 kV HVDC 765 kV 400 kV 220 kV
IR addition in 12th
Plan (up to March
2017)
Inter-regional
Transmission
Capacity at the end
of Plan Period 2017-
22 (as on April19)
IR at the end of 11th
PlanIR at the end of 12th
Plan
IR Capacity Addition
at the end of Plan
Period 2017-22 (Till
April 19)
2004-05 27800
2005-06 28100
2006-07 30200
2007-08 33000
2008-09 35500
2009-10 36700
2010-11 38700
2011-12 41756
2012-13 45460
2013-14 48940
2014-15 53040
2015-16 54590
2016-17 57430
2017-18 60800
2018-19 62890
Year
2005-06
2006-07
2007-08
2008-09
2009-10
2010-11
2011-12
2012-13
2013-14
2014-15
2015-16
2016-17
2017-18
2018-19
2004-05 254 209 7568
2005-06 260 221 7636
2006-07 276 227 7423
2007-08 293 239 7727
2008-09 340 263 8713
2009-10 355 268 8870
2010-11 398 303 11975
2011-12 455 330 13514
2012-13 501 376 14867
2013-14 518 175
2014-15 520
Source- PFC Reports on the performance of State Power Utilities 31
1181
7335
7786
91441
8188
88363
957
1010
1075
1122
1149
(GrossGen+ Net Import) Mid-year population Provisional
5 Average cost of power supply amp average realization ( paiseKWH )
Yearcost of supply
(paiseunit)
Realization(paiseunit)
Including AgricultureOnly
Agriculture
6719
7171
3 All India yearly Coal Consumption for Power Generation (Utilities)
YEARCoal Consumption
Million Tonnes
4 All India Annual per Capita consumption of Electricity Since 2006
Per Capita Consumption ( kWh)
6314
Sl
NoExecuting Agency
Installed
Capacity (MW)Cost (Rs crore)
Date of
Clearance
32
Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as
Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received
from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made
available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified
villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is
independent of the earlier published reports
No Hydro Electric Project has been issued concurrenceAppraisal letter by CEA during April 2019
7 Status of Hydro Schemes Cleared by the CEA in Apr-2019
Name of Scheme
1999-002000-01
297594
010408 to 310309010409 to 310310
10th Plan
2005-062006-07
322968331020
6 Growth Of Rural Electrification amp Pumpsets Energisation
Plan Year
9th Plan2002-03
134092626
4111
Pump Sets Energised Villages Electricfied (Nos)
2001-02
284064367244
1218
27801997-981998-99
3207
482864
12632
1576036
4451722594
15455554
2314176
397343611750
2093311060316074
65109527813884
46708
18423975
499150
2003-042004-05
5743
9769
Cumu upto End of 10th Plan
010407 to 310308
010410 to 310311557976840909
010411 to 310312
412667
86293726
No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification
since 2004-05
65291374575 296361511th Plan
Cumu upto End of 11th Plan
596556 21212860
557439Cummulative up to end of 12th Plan
SN Contents Page
1 Rate of sale of power for the year 2016-17 33-41
RATE OF SALE OF POWER FOR THE YEAR 2016-17
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) NORTHERN REGION
CENTRAL SECTOR
BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 18000 66900 19800
CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 54000 222400 21600
CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 30000 144400 19600
CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 23100 91700 42600
PARBATI - III HPS NHPC LTD HYDRO-HYDRO 52000 68200 54800
DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 28000 95600 30000
CHUTAK NHPC LTD HYDRO-HYDRO 4400 22000 79800
DULHASTI HPS NHPC LTD HYDRO-HYDRO 39000 228000 56400
SALAL HPS NHPC LTD HYDRO-HYDRO 69000 342300 11000
TANAKPUR HPS NHPC LTD HYDRO-HYDRO 9420 43000 29600
URI HPS -I NHPC LTD HYDRO-HYDRO 48000 280300 16000
URI HPS - II NHPC LTD HYDRO-HYDRO 24000 147300 48600
NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 4500 24600 88200
SEWA - II NHPC LTD HYDRO-HYDRO 12000 47100 43400
ANTA CCPP NTPC LTD THERMAL-GASN 41930 67539 32400
AURAIYA CCPP NTPC LTD THERMAL-GASN 66336 53501 39100
BADARPUR TPS NTPC LTD THERMAL-COAL 70500 159153 44800
DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 84000 296170 42300
DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 98000 526686 46300
DADRI CCPP NTPC LTD THERMAL-GASHSD 82978 227469 33000
FARIDABAD CCPP NTPC LTD THERMAL-GASN 43159 115577 30800
RIHAND STPS I NTPC LTD THERMAL-COAL 100000 596766 24500
RIHAND STPS II NTPC LTD THERMAL-COAL 100000 737069 24600
RIHAND STPS III NTPC LTD THERMAL-COAL 100000 706546 30600
SINGRAULI STPS NTPC LTD THERMAL-COAL 200000 1394068 20400
TANDA TPS NTPC LTD THERMAL-COAL 44000 295438 40800
UNCHAHAR TPS I NTPC LTD THERMAL-COAL 42000 256454 39800
UNCHAHAR TPS II NTPC LTD THERMAL-COAL 42000 273577 38900
UNCHAHAR TPS III NTPC LTD THERMAL-COAL 21000 142780 43000
KOLDAM NTPC LTD HYDRO-HYDRO 80000 363260 43600
NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 303575 25841
RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 108000 668677 35374
NJHPS SJVNL HYDRO-HYDRO 150000 699496 23820
RAMPUR HPS SJVNL HYDRO-HYDRO 41202 195982 32260
TEHRI HPP THDC HYDRO-HYDRO 100000 272543 51800
KOTESHWAR HEP THDC HYDRO-HYDRO 40000 106244 53400
IGSTPS JHAJJAR ARAVALI P CPL THERMAL-COAL 150000 510429 49490
NEYVELI BARSINGSAR NEYVELI LIG CORP LTD THERMAL-LIG 25000 127520 38040
STATE SECTOR
PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 21000 14222 48200
PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 21000 19205 48400
PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 25000 102257 42600
PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 25000 62107 41800
DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 60000 312213 41000
RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 120000 35767442200
WYC HYDEL STATION HPGCL HYDRO-HYDRO 6240 20365 24900
GIRI POWER HOUSE HPSEB HYDRO-HYDRO 6000 13958 7600
ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 1695 5467 11900
BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 12000 18528 6700
GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 2250 7462 22500
BASSI POWER HOUSE HPSEB HYDRO-HYDRO 6600 29649 7500
BINWA POWER HOUSE HPSEB HYDRO-HYDRO 600 2749 19300
ANNEXURE-I
RATE OF SALE OF POWER FOR THE YEAR 2016-2017
Page 33
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) GAJ POWER HOUSE HPSEB HYDRO-HYDRO 1050 2914 26700
BANER POWER HOUSE HPSEB HYDRO-HYDRO 1200 2864 16200
HOLI POWER HOUSE HPSEB HYDRO-HYDRO 300 616 22500
THIROT POWER HOUSE HPSEB HYDRO-HYDRO 450 1126 22500
KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 1200 3064 22500
LARJI POWER HOUSE HPSEB HYDRO-HYDRO 12600 53677 23700
NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 250 750 31000
CHABA POWER HOUSE HPSEB HYDRO-HYDRO 175 465 23300
RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 150 101 13400
SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 200 000 22500
KILLAR HPSEB HYDRO-HYDRO 030 050 22500
BHABA AUGUMENP H HPSEB HYDRO-HYDRO 450 1276 22500
BS CHAMBA HPSEB HYDRO-HYDRO 045 099 19500
GUMMA HPSEB HYDRO-HYDRO 300 423 22500
GAS TURBINE POWER STATION IPGCL THERMAL-GAS 27000 67233 39300
PPS-I PPCL THERMAL-GAS 33000 175905 38300
PPS-III PPCL THERMAL-GAS 137120 196879 36100
LOWER JHELUM JampKPDD HYDRO-HYDRO 10500 60214 5100
UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 2260 10514 6300
UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 10500 44202 8500
GANDHARBAL JampKPDD HYDRO-HYDRO 1500 8925 4700
KARNAH MPH JampKPDD HYDRO-HYDRO 200 1122 31000
CHENANI I JampKPDD HYDRO-HYDRO 2330 10892 6600
CHENANI II JampKPDD HYDRO-HYDRO 200 1188 9300
CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 750 3634 14200
IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 375 2108 18500
IGO MERCHELLONG JampKPDD HYDRO-HYDRO 300 1572 29700
PAHALGAM MHP JampKPDD HYDRO-HYDRO 450 1713 32900
MARPACHOO JampKPDD HYDRO-HYDRO 075 375 29800
HAFTAL JampKPDD HYDRO-HYDRO 100 483 28700
SANJAK JampKPDD HYDRO-HYDRO 126 441 36000
SEWA-III JampKPDD HYDRO-HYDRO 900 3273 20200
BHADERWAH JampKPDD HYDRO-HYDRO 150 935 8900
BAZGO JampKPDD HYDRO-HYDRO 030 108 33300
SUMOOR JampKPDD HYDRO-HYDRO 010 045 35400
HUNDER JampKPDD HYDRO-HYDRO 040 176 26200
STAKNA JampKPDD HYDRO-HYDRO 400 1933 4100
KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 124000 662879 31360
SURATGARH TPS RRVUNL THERMAL-COAL 150000 402328 41730
CHHABRA TPS 1amp 2 RRVUNL THERMAL-COAL 50000 305946 36700
CHHABRA TPS 3 RRVUNL THERMAL-COAL 25000 151536 36700
CHHABRA TPS 4 RRVUNL THERMAL-COAL 25000 155896 36700
RAMGARH GT POWER PROJECT RRVUNL THERMAL-COAL 22050 43177 41800
RAMGARH GAS T P PROJECT 3 RRVUNL THERMAL-GAS 5000 93615 41800
DHOLPUR C C POWER PROJECT RRVUNL THERMAL-R-LNG 33000 9486 46110
MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 14000 20855 34192
MINI MICRO HYDEL (MMH) P S RRVUNL HYDRO-HYDRO 2385 851 37800
KALISINDH TPP 1 RRVUNL THERMAL-COAL 60000 341543 45000
KALISINDH TPP 2 RRVUNL THERMAL-COAL 60000 211588 45000
KHARA HEP UPJVNL HYDRO-HYDRO 7200 26654 7200
MATATILLA HEP UPJVNL HYDRO-HYDRO 3060 12219 6500
OBRA HEP UPJVNL HYDRO-HYDRO 9900 21517 6300
RIHAND UPJVNL HYDRO-HYDRO 30000 57369 5500
ANPARA A TPS UPRVUNL THERMAL-COAL 63000 317536 27000
ANPARA B TPS UPRVUNL THERMAL-COAL 100000 705605 22700
ANPARA D UPRVUNL THERMAL-COAL 100000 300158 39800
HARDUAGANJ TPS UPRVUNL THERMAL-COAL 16500 45817 49200
HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 50000 304389 46600
OBRA A TPS UPRVUNL THERMAL-COAL 28800 13158 34000
OBRA B TPS UPRVUNL THERMAL-COAL 100000 328124 21900
Page 34
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) PANKI TPS UPRVUNL THERMAL-COAL 21000 66488 50300
PARICHHA TPS UPRVUNL THERMAL-COAL 22000 38762 49400
PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 42000 231931 45600
PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 50000 276722 50400
CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 24000 70845 8290
CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 14400 75366 8390
DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 3375 9595 12080
DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 5100 18701 10520
KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4140 17359 12330
KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 12000 33001 9420
KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 3000 11953 8320
TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 9000 33983 12460
MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 30400 124510 16110
RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 19800 17897 10550
MPUR UTTARAKHAND JVNL HYDRO-HYDRO 930 5121 19200
PATHRI UTTARAKHAND JVNL HYDRO-HYDRO 2040 11636 14200
GALOGI UTTARAKHAND JVNL HYDRO-HYDRO 300 648 12500
PRIVATE SECTOR
MGTPP CLP INDIA PVT LTD THERMAL-COAL 132000 268902 41940
SHRINAGAR HEP ALAKNANDA HPCL HYDRO-HYDRO 33000 127414 48800
GAMA INFRAPROP CCPP GAMA INFRAPROP PVT THERMAL-GAS 22500 52686 47000
PPGCL (BARA) JP POWER VENTURES LTD THERMAL-COAL 198000 448200 38500
MALANA HEP MALANA PCL HYDRO-HYDRO 8600 26354 29792
MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 10000 30369 32580
ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 19200 56347 36079
KASHANG HEP H P PCL HYDRO-HYDRO 19500 5034 29200
BASPA-II HEP HBPCL HYDRO-HYDRO 30000 132769 13600
KARCHAM WANGTOO HEP HBPCL HYDRO-HYDRO 100000 434386 36600
RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 108000 582600 43700
RITHALA COMBI CY POWER PLANT TATA POWER DDL THERMAL-GAS 9480 000 11900
RAJPURA TPS NABHA POWER LTD THERMAL-GAS 140000 901484 39000
TALWANDI SABO POWER LTD TALWANDI SABO POWER LTD THERMAL-COAL 198000 636040 49548
ROJA THERMAL POWER STATION ROJA POWER SCL THERMAL-COAL 120000 727200 43400
KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 34400 63400
BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 36000 62600
MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 38200 60800
UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 37900 61500
KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 42300 58800
LALITPUR PGCL BAJAJ ENERGY PVT LTD THERMAL-COAL 198000 359400 47300
PRAYAGRAJ PGCL PRAYAGRAJ PGCL THERMAL-COAL 132000 448200 38595
KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 132000 783182 33438
WESTERN REGION
CENTRAL SECTOR
INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 100000 325333 23892
OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 52000 141663 34001
GANDHAR CCPP NTPC LTD THERMAL-GAS 65739 221924 28700
KAWAS CCPP NTPC LTD THERMAL-GASN 65620 167929 27000
KORBA I amp II NTPC LTD THERMAL-COAL 210000 1499171 20500
KORBA III NTPC LTD THERMAL-COAL 50000 358746 26600
SIPAT STPS I NTPC LTD THERMAL-COAL 198000 1479902 26800
SIPAT STPS II NTPC LTD THERMAL-COAL 100000 766549 26500
VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 126000 693142 25800
VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 100000 608781 23800
VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 100000 673475 27600
VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 100000 655924 32900
VINDHYACHAL STPS V NTPC LTD THERMAL-COAL 50000 328265 31700
MOUDA I NTPC LTD THERMAL-COAL 100000 343130 44500
MOUDA Ii NTPC LTD THERMAL-COAL 66000 40637 39900
RATNAGIRI GAS amp POWER PVT LTD RGPPL THERMAL-GAS 196708 442485 47000
KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 000 24729
TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 32000 201227 10740
Page 35
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 365122 19069
TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 787444 29324
STATE SECTOR
GSEG-HAZIRA15610 MW GUJARAT S ENEGEN LTD THERMAL-GAS 15610 1805 28200
GSEG-HAZIRA35143 MW GUJARAT S ENEGEN LTD THERMAL-GAS 35130 22276 51300
GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 21978 51800
AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 13929 26100
KORBA TPS EAST CSPGCL THERMAL-COAL 44000 198673 33880
DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 365808 27570
KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 316500 30420
HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 532878 19410
CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 515 58300
MTTPS CHAMPA U-I CSPGCL THERMAL-COAL 50000 220376 39000
MTTPS CHAMPA U-II CSPGCL THERMAL-COAL 50000 23709 10000
SHP GANGREL CSPGCL HYDRO-HYDRO 1000 2350 36790
BANGO HEP CSPGCL HYDRO-HYDRO 12000 14662 8900
MHP KORBA WEST CSPGCL HYDRO-HYDRO 170 859 38190
SIKASAR HEP CSPGCL HYDRO-HYDRO 700 418 26870
DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8843 74500
DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 19446 51500
GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 66388 71600
GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127488 41300
KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 96072 43900
KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 29841 56400
SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 184966 58800
UKAI 1-5 GSECL THERMAL-COAL 85000 204891 46900
UKAI TPS 6 GSECL THERMAL-COAL 50000 284448 48200
WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 271999 58300
WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 82808 44100
KADANA HPS GSECL HYDRO-HYDRO 24200 34433 16800
UKAI HPS GSECL HYDRO-HYDRO 30500 40585 6100
TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 123000 11500
BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 8900 10900
BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 7200 27500
JHINNA HPS MPPGCL HYDRO-HYDRO 2000 9700 18500
RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 44300 3400
GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 17300 4600
SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 4100 16900
MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 14600 27000
PENCH HPS MPPGCL HYDRO-HYDRO 16000 23700 8100
RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 3000 16900
AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 134400 35100
SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 283800 38700
SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 344600 34300
SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 111600 61600
SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 211800 58000
SSTPS PH-I MPPGCL THERMAL-COAL 120000 233100 84300
BHUSAWAL TPS MSPGCL THERMAL-COAL 142000 566258 51100
CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1365682 33700
KHAPERKHEDA MSPGCL THERMAL-COAL 134000 706207 39100
KORADI TPS MSPGCL THERMAL-COAL 62000 443206 42000
NASIK TPS MSPGCL THERMAL-COAL 63000 297275 47000
PARLI TPS MSPGCL THERMAL-COAL 113000 175934 71600
PARAS MSPGCL THERMAL-COAL 50000 267931 38700
URAN CCPP MSPGCL THERMAL-GAS 67200 320330 30600
KOYANA MSPGCL HYDRO-HYDRO 195600 328155 13100
SMALL HYDRO POWER PLANTS MSPGCL HYDRO-HYDRO 45400 93062 30500
BHIRA MSPGCL HYDRO-HYDRO 8000 10046 8400
TILLARI MSPGCL HYDRO-HYDRO 8900 10584 3100
SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 233298 20500
SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 87633 20500
PRIVATE SECTOR
Page 36
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 81282 46750
JNSTPP(JAYPEE NIGRIE) JP POWER VENTURES LTD THERMAL-COAL 132000 726695 29310
MB POWER MB POWER THERMAL-COAL 120000 345632 38310
ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 754922 28671
ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 780761 23495
ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 198000 1263784 32090
ADANI POWER MAHARA ADANI POWER LTD THERMAL-COAL 330000 1666191 34124
AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 170065 36827
SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 252035 45129
ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 458551 36000
ESSAR POWER MP LTD ESSAR POWER MP LTD THERMAL-COAL 60000 243040 28600
VEDANTA LTD (P P -I) VEDANTA LTD THERMAL-GAS 3000 15044 24000
VEDANTA LTD (P P -II) VEDANTA LTD THERMAL-GAS 3000 21293 24000
PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 8234600 24000
165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 5850 64390
145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 68717 40349
SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 132655 28776
SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 144686 38567
MUNDRA UMPPCOASTAL GUJARAT POWER
LTD THERMAL-IMP COAL 400000 2530300
23900
LANCO AMARKANTAK TPP PATHADIH
U-ILANCO AMARKAN POWER LTD THERMAL-COAL 30000 195500
29200
LANCO AMARKANTAK TPP PATHADIH
U-IILANCO AMARKAN POWER LTD THERMAL-COAL 30000 206900
27600
BARADARHA TPS D B POWER LTD THERMAL-COAL 120000 677373 29200
JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 405000 28900
JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 453000 40500
DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 339437 40700
TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 293400 44000
TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 137200 37000
TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 174900 44000
BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 92900 14100
BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23700 34300
KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 27600 48300
CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2530300 23900
BHANDARDRA HEP -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 2475 54900
SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 161400 26500
SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 445000 39000
SOTHERN REGION
CENTRAL SECTOR
NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 325699 54820
NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 305532 39880
NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 998805 38510
NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 113016 54070
NEYVELI TAMILNADU POWER LTD JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 625274 42200
VALLUR TPS NTPC TECL THERMAL-COAL 150000 856438 42350
R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 1493 84300
RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1502919 29400
RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 341291 31800
SIMHADRI I NTPC LTD THERMAL-COAL 100000 688382 36800
SIMHADRI II NTPC LTD THERMAL-COAL 100000 663657 43400
KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 593110 31324
MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 291625 21764
KKNPP-1 amp 2 NPCIL NUCLEAR-NUCLEAR 200000 572609 40948
MINICOY LAKSHADEEP THERMAL-DIESEL 340 770 29600
KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1097 29600
AMINI LAKSHADEEP THERMAL-DIESEL 265 509 29600
ANDROTT LAKSHADEEP THERMAL-DIESEL 219 524 29600
KALPENI LAKSHADEEP THERMAL-DIESEL 175 356 29600
AGATTI LAKSHADEEP THERMAL-DIESEL 195 658 29600
KADMAT LAKSHADEEP THERMAL-DIESEL 190 414 29600
KILTAN LAKSHADEEP THERMAL-DIESEL 150 269 29600
CHETLET LAKSHADEEP THERMAL-DIESEL 100 139 29600
BITRA LAKSHADEEP THERMAL-DIESEL 043 024 29600
BANGARAM LAKSHADEEP THERMAL-DIESEL 018 009 29600
Page 37
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) STATE SECTOR
Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 721811 46500
Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 50000 336142 46500
RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 237358 46500
RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 239926 46500
RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 124500 46500
SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 62109 46500
UPPER SILERU APGENCO HYDRO-HYDRO 24000 33000 46500
LOWER SILERU APGENCO HYDRO-HYDRO 46000 81066 46500
DONKARAI APGENCO HYDRO-HYDRO 2500 6007 46500
PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 1262 46500
CHETTIPETA APGENCO HYDRO-HYDRO 100 214 46500
MUCHKUND APGENCO HYDRO-HYDRO 12000 37571 46500
NAGARJUNASAGAR RCPH APGENCO HYDRO-HYDRO 9000 606 46500
TUNGABHADRA HES amp HAMPI(AP
Share)
APGENCO HYDRO-HYDRO 7200 6100 46500
KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 352232 42600
KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 288131 32500
KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 319272 46500
RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 40073 44300
KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 308317 46000
KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 308963 51300
SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 61004 76600
NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 17960 75300
PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 20873 58300
POCHAMPAD-I TSPGENCO HYDRO-HYDRO 2700 5455 29800
POCHAMPAD-II TSPGENCO HYDRO-HYDRO 900 1932 40700
NIZAMSAGAR TSPGENCO HYDRO-HYDRO 1000 1126 53400
RAICHUR TPS 1 to 7 KPCL THERMAL-COAL 147000 890866 43800
RAICHUR TPS 8 KPCL THERMAL-COAL 25000 159523 48200
BELLARI TPS 1 KPCL THERMAL-COAL 50000 318679 51100
BELLARI TPS 2 KPCL THERMAL-COAL 50000 232347 55600
BELLARI TPS 3 KPCL THERMAL-COAL 70000 47565 34400
BHADRA PH KPCL HYDRO-HYDRO 3920 2369 45900
GERUSUPPA PH KPCL HYDRO-HYDRO 24000 26990 22000
GHAT PRABHA HEP KPCL HYDRO-HYDRO 3200 4777 25300
KADRA HPS KPCL HYDRO-HYDRO 15000 16889 26800
NAGJHARI KPCL HYDRO-HYDRO 90000 155159 9800
KODASALLI DPH KPCL HYDRO-HYDRO 12000 14854 19200
MUNIRA+MGH+SPH+SPH KPCL HYDRO-HYDRO 22640 48211 7900
SHARAVATHY HPS KPCL HYDRO-HYDRO 108550 276215 5400
ALMATTI DPH KPCL HYDRO-HYDRO 29000 39611 24600
VARAHI UGPH KPCL HYDRO-HYDRO 46000 71368 15600
IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 17196 15300
IDUKKI HPS KSEB HYDRO-HYDRO 78000 137905 15300
KAKKAD HPS KSEB HYDRO-HYDRO 5000 13063 15300
KALLADA HPS KSEB HYDRO-HYDRO 1500 4436 15300
KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 46544 15300
KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 635 15300
LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 30822 15300
MALANKARA HPS KSEB HYDRO-HYDRO 1050 2474 15300
MATTUPETTY KSEB HYDRO-HYDRO 200 230 15300
MALAMPUZHA KSEB HYDRO-HYDRO 250 063 15300
CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 864 15300
URUMI ST I amp II KSEB HYDRO-HYDRO 615 903 15300
LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 248 15300
NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7765 19625 15300
PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 16601 15300
PANNIAR HPS KSEB HYDRO-HYDRO 3240 6217 15300
PORINGALKUTHU KSEB HYDRO-HYDRO 3600 10052 15300
PORINGALKUTHU LBE KSEB HYDRO-HYDRO 1600 9438 15300
PEPPARA KSEB HYDRO-HYDRO 300 395 15300
POOZHITHODE KSEB HYDRO-HYDRO 480 1045 15300
Page 38
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) PEECHI KSEB HYDRO-HYDRO 125 040 15300
RANI-PERUNADU KSEB HYDRO-HYDRO 400 585 15300
SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 79783 15300
SENGULAM HPS KSEB HYDRO-HYDRO 5120 11558 15300
SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 16711 15300
VILANGAD KSEB HYDRO-HYDRO 750 1578 15300
BARAPOLE KSEB HYDRO-HYDRO 1500 1932 15300
VELLATHOOVAL KSEB HYDRO-HYDRO 360 305 15300
CHIM0NY KSEB HYDRO-HYDRO 250 156 15300
ADYANPARA KSEB HYDRO-HYDRO 350 501 15300
BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 554 15300
KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 3801 15300
KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 23132 32800
ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 14416 62280
METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 523970 62280
METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 321270 62280
NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 336575 62280
NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 591240 62280
TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 508966 62280
KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 30897 62280
VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 18720 90699 62280
KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 33593 62280
BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 1047 62280
PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 1250 62280
PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 330 62280
MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 4897 62280
MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 032 62280
KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15681 62280
KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 40608 62280
KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 21342 62280
KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 4717 62280
KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4322 62280
KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2399 62280
METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 4416 62280
METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 8035 62280
BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2187 62280
BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2359 62280
BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2511 62280
BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 1949 62280
BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 1819 62280
POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 172 62280
SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 241 62280
MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 026 62280
THIRUMOORTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 136 62280
PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 9309 62280
VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 353 62280
SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 4192 62280
PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 6571 62280
SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 1186 62280
SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6319 62280
ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 6122 62280
KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 28674 62280
SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 18381 62280
SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 4258 62280
KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 12680 62280
KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4201 62280
ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 000 62280
PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 19175 62280
AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 078 62280
BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 504 62280
BHAVANI KATTALAI (BKB)(IIIampIII BB I amp II)TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 5847 62280
PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 000 62280
Page 39
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) SRI DAMODARAM STPS APPDCL THERMAL-COAL 160000 808108 36300
PRIVATE SECTOR
KARUPPUR TANJORE LANCO TANJORE PCL THERMAL-GAS 12000 48096 28770
SIMHAPURI ENERGY LTD SIMHAPURI ENERGY LTD THERMAL-COAL 60000 143900 39100
JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 7111 45500
SBU 1 JSW ENERGY LTD
VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 26000 159100
43300
SBU 2 JSW ENERGY LTD
VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 60000 247900
42800
LANCO KPLLANCO KONDAPALLI POWER
LTDTHERMAL-GAS 36814 85060
25776
LANCO KPL STG -IILANCO KONDAPALLI POWER
LTDTHERMAL-GAS 36600 12979
46330
LANCO KPL STG -IIIALANCO KONDAPALLI POWER
LTDTHERMAL-GAS 37100 85710
46330
LANCO KPL STG -III BLANCO KONDAPALLI POWER
LTDTHERMAL-GAS 37100 43639
46330
HINDUJA NATIONAL PCL HINDUJA NATIONAL PCL THERMAL-COAL 104000 303000 38200
MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 121164 49940
UDUPI POWER COR LTD ADANI POWER LTD THERMAL-COAL 120000 754613 42500
SPECTRUM POWER GENERATION
LTD SPECTRUM PG LTD THERMAL-GASN 20525 9256812
34952
TAQA NEYVELI POWER COM PVT
LTD TAQA NEYVELI THERMAL-LIG 25000 5840
34500
ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 251000 51000
ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 207860 36800
GMR VEMAGIRI POWER GENERATION
LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 30117
46450
EASTERN REGION
CENTRAL SECTOR
MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 64675 53113
MTPS STAGE - II KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 39000 1432 69138
BOKARO `B` TPS DVC THERMAL-COAL 63000 145670 31539
MEJIA TPS U 1-3 DVC THERMAL-COAL 63000 348298 31552
MEJIA TPS U 4 DVC THERMAL-COAL 21000 116099 34997
MEJIA TPS U 5-6 DVC THERMAL-COAL 50000 276427 35976
MEJIA TPS U 7-8 DVC THERMAL-COAL 100000 552854 36991
DURGAPUR STEEL TPS DVC THERMAL-COAL 100000 665550 39323
DURGAPUR TPS DVC THERMAL-COAL 21000 59270 35416
RAGHUNATHPUR TPS DVC THERMAL-COAL 120000 201650 35326
MAITHON HYDEL STA DVC HYDRO-HYDRO 6320 12200 17984
CHANDRAPURA TPSU1-3 DVC THERMAL-COAL 42000 257610 35095
CHANDRAPURA TPSU7-8 DVC THERMAL-COAL 50000 306673 34987
KODERMA TPS DVC THERMAL-COAL 100000 380180 38131
PANCHET HPS DVC HYDRO-HYDRO 8000 13360 17984
TILLAYA HPS DVC HYDRO-HYDRO 400 1410 17984
RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34700 35400
TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 277300 23200
TLDP -III NHPC LTD HYDRO-HYDRO 13200 55400 62000
TLDP -IV NHPC LTD HYDRO-HYDRO 16000 60300 25600
FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 957219 33700
FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 308943 41000
BONGAINGAON TPS NTPC LTD THERMAL-COAL 25000 153663 58600
KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 542277 34200
KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 942591 34200
BARH-II NTPC LTD THERMAL-COAL 132000 728021 44500
TALCHER TPS NTPC LTD THERMAL-COAL 46000 335521 30100
TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 702319 25600
TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1436521 24700
STATE SECTOR
BTPS(RampM) BIHAR STATE PGCL THERMAL-COAL 22000 12142 39700
BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 98331 10602
HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 50593 9482
CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 19689 2605
RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 53192 6033
UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 147208 14637
Page 40
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 60353 4519
IB TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 288567 25000
J P H GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 210 038 61100
MEYONG CHU GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 400 1086 61100
TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 122667 38200
DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 214339 43321
KOLAGHAT THERMAL POWER
STATION
WEST BENGAL PDCL THERMAL-COAL 126000 538269 31603
BAKRESHWAR THERMAL POWER
PLANT
WEST BENGAL PDCL THERMAL-COAL 105000 634876 32154
BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 45000 166855 33299
SANTHALDIH THERMAL POWER
STATION
WEST BENGAL PDCL THERMAL-COAL 50000 336442 34932
SAGARDIGHI THERMAL POWER
PROJECT
WEST BENGAL PDCL THERMAL-COAL 160000 423121 34705
JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 20344 68900
RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 24559 68900
TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 4623 68900
PURULIA PUMPED STORAGE
PROJECT
WEST BENGAL SEDCL HYDRO-HYDRO 90000 108816 68900
MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2768 68900
PRIVATE SECTOR
CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 49474 20230
CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 555500 70200
HALDIA ENERGY HALDIA ENERGY LTD THERMAL-COAL 60000 371000 50400
DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3688 63400
KAMALANGA TPS GMR KAMALANGA ENERGY LTD THERMAL-COAL 105000547670
33300
ADHUNIK POWER U-1 ADHUNIK POWER THERMAL-COAL 27000 158 44060
ADHUNIK POWER U-2 ADHUNIK POWER THERMAL-COAL 27000 168 44250
VL-JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 332800 23622
JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 43000 45250
JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 71700 37030
JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 70700 35920
JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 71100 38870
JOJOBERA UNIT 5 TATA POWER COM LTD THERMAL-COAL 12000 79300 44560
JOJOBERA UNIT 6 TATA POWER COM LTD THERMAL-WHR 12000 83700 12840
IEL KALINGANAGAR U-I TATA POWER COM LTD THERMAL-WG 6750 33400 22500
IEL KALINGANAGAR U-II TATA POWER COM LTD THERMAL-WG 6750 34800 22500
MAITHON UNIT 1 amp 2 TATA POWER COM LTD THERMAL-COAL 105000 678000 36100
HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 27500 24340
HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 28400 24340
HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 15800 24310
NORTH EASTERN REGION
CENTRAL SECTOR
LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 74100 36600
AGARTALA GT NEEPCO THERMAL-GAS 13500 88611 27210
ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 153111 32310
DOYANG HEP NEEPCO HYDRO-HYDRO 7500 25598 49801
KOPILI HEP NEEPCO HYDRO-HYDRO 20000 98186 11491
KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 19582 20237
KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 10310 17968
RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 124093 22945
TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 10100 17344 39000
STATE SECTOR
HYDRO POWER (122 Stns) ITANAGAR GOVT OF ARUNACHAL
PRADESHHYDRO-HYDRO 6971 6217270
24600
KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39514 17337
LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 82327 36810
NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 33318 48290
MYNTRIANG SHEP ST II ASSAM POWER GENCO HYDRO-HYDRO 300 567 35776
LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 9130 49200
LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 012 49200
DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 022 49200
TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 000 49200
UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 4990 16000
UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 6476 37000
UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 16494 14600
UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 3600 9556 15000
SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 758 8000
MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44070 44800
KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 154 41400
TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 091 41400
MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 411 41400
MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 394 41400
KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 760 41400
SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 3264 41400
LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 044 41400
BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 18953 28000
ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 43585 28200
GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 4080 11100
Note
LIG Lignite N Naptha WHR Waste Heat Recovery
Page 41
Voltage Level
+- 800 KV HVDC
+- 500 KV HVDC
765 KV
400 KV
220 KV
All India
Voltage Level
+- 800 KV HVDC
+- 500 KV HVDC
765 KV
400 KV
220 KV
All India
6
0 0
All India Transformation Capacity Addition during Apr-18 to Apr-18 amp Apr-19
to Apr-19 (MVA)
4600
0
500
2795
1305
5470
4000
185
1285
0
Apr-18 to Apr-18 Apr-19 to Apr-19
5470
0
500
4600
2795
1305
7 Transformation Capacity Addition During Apr-2019 (MVA)
0
4000
185
1285
0 0
Apr-18 Apr-19
5470
4600
4000
4200
4400
4600
4800
5000
5200
5400
5600
MV
A
Apr-18 Apr-19
5470 4600
0
74520
1
MV
A
Apr-18 to Apr-18 Apr-19 to Apr-19
Apr-2018 Apr-2019 Apr-2018 Apr-2019 Apr-2018 Apr-2019
Northern 28590 30094 28170 29786 -15 -10
Western 33235 34875 33233 34868 00 00
Southern 29211 31111 29166 31109 -02 00
Eastern 11752 12851 11650 12850 -09 00
North Eastern 1225 1300 1174 1228 -42 -55
All India 104013 110231 103393 109842 -06 -04
Apr-2018 Apr-2019 Apr-2018 Apr-2019 Apr-2018 Apr-2019
Northern 48824 54476 48367 53985 -09 -09
Western 50654 56242 50434 56222 -04 00
Southern 45946 49155 45684 49103 -06 -01
Eastern 21320 23349 21275 23349 -02 00
North Eastern 2600 2848 2552 2780 -18 -24
All India 162492 177411 161286 176810 -07 -03
Apr-2019 Figures are Provisional
7
8 Power Supply Position (Energy amp Peak) in Apr-2019
Peak Demand Peak Met
Requirement Availability
Energy (MU)Region
Surplus(+)
Deficit (-) in
Surplus(+)
Deficit (-) in Region
Power (MW)
Chandigarh Delhi Haryana HP JampK Punjab Rajasthan UP Utrakhand Apr-2018 0 0 0 0 546 0 0 247 0
Apr-2019 0 0 0 0 565 0 0 0 0
Chattisgarh Gujarat MP Maharashtra Daman amp Diu Dadar Nagar Goa
Apr-2018 13 11 3 99 0 0 0
Apr-2019 22 6 0 8 1 0 0
AP Telangana Karnataka Kerala Tamil Nadu Puducherry Lakshadweep
Apr-2018 22 0 2 0 0 20 0
Apr-2019 0 0 0 8 0 2 0
8
9 Peak Shortage of Power Supply (MW) in Different Regions in Apr-2019
0 0 0 0
565
0 0 0 00 0 0 0
546
0 0
247
0
0
400
800
Ch
an
dig
ar
h Delh
i
Ha
rya
na
HP
Jamp
K
Pu
nja
b
Ra
jasth
an
UP
Utr
akhan
d
MW
Northern States (MW) Apr-2019 Apr-2018
22
6 0 8 1 0 0
13
11
3
99
0 0 0
0
50
100
150
Ch
attis
gar
h
Guja
rat
MP
Mah
ara
shtr
a
Da
man amp
Diu
Da
dar
Na
gar G
oa
MW
Western States (MW) Apr-2019 Apr-2018
0 0 08
0 2 0
22
0 2 0 0
20
00
50
AP Telangana Karnataka Kerala Tamil Nadu Puducherry Lakshadweep
Southern State (MW) Apr-2019 Apr-2018
Bihar DVC Jharkhand Odisha West Bengal Sikkim AampN Island
Apr-2018 0 39 0 0 7 0 4
Apr-2019 0 0 0 0 0 0 4
Arunachal Assam Manipur Meghalaya Mizoram Nagaland Tripura
Apr-2018 5 30 7 0 9 29 4
Apr-2019 3 45 9 0 3 26 1
9
0 0 0 0 0 0
4
0
39
0 0
7
0
4
01020304050
Bih
ar
DV
C
Jha
rkh
an
d
Od
ish
a
We
st
Be
ng
al
Sik
kim
Aamp
NIs
land
MW
Eastern States (MW) Apr-2019 Apr-2018
3
45
9
0 3
26
1
5 7
0
9
29
4
0
10
20
30
40
50
Aru
na
cha
l
Assa
m
Ma
nip
ur
Me
gh
ala
ya
Miz
ora
m
Na
gala
nd
Trip
ura
MW
North-Eastern States (MW)
Sector Apr-2018 Apr-2019
Central 7634 7459
State 6438 6142
Private Sector IPP 5525 6005
Private Sector UTL 6815 6440
ALL INDIA 6454 6471
Month PLF 2018 PLF 2019
Jan 6215 6054
Feb 6230 6051
March 6452 6340
April 6454 6471
For Coal and Lignite based Power Plants and Provisional based on Actual-Cum-Assesment
10
PLF of Thermal Power Plants
(excluding gas based power plants)
All India PLF of Thermal Plants (Excluding Gas Based Plants) Month-wise
10 All India Thermal PLF Sector-wise (Excluding Gas Based Power Plants) for Apr-2019
5800
6000
6200
6400
6600
Jan Feb March April
Months
All India PLF Month-wise
PLF 2018 PLF 2019
7634
64385525
6815 6454
7459
6142 60056440 6471
000
2000
4000
6000
8000
10000
Central State Private Sector IPP Private Sector UTL ALL INDIA
All India Thermal PLF
Apr-2018 Apr-2019
2012-13 2013-14 2014-15 2015-16 2016-17 2017-18
TampD Losses 2304 2284 2277 2181 2142 2104
ATampC Losses 2548 2262 2572 2398 NA NA
Provisional
Note As per PFC for utilities selling directly to consumers NA- Not Available
Total Number of Villages
597464
Note From the year 2004-05 onwards Definition of Village Electrification-
A village would be declared Electrified if
Without
Subsidy
Gap ACS-
ARR(
Without
Subsidy)
Paiseunit
Gap ACS-
ARR (on
subsidy
booked
basis)
paiseunit
Gap ACS-
ARR (on
subsidyrece
ived basis)
paiseunit
2013-14 400 118 76 77
2014-15 412 108 58 60
Source- PFC Reports on the performance of State Power Utilities
2013-14 4894
2014-15 5304
2015-16 5459
2016-17 5743
2017-18 6080
2018-19 6289
11
11 T amp D and ATampC Losses ()
12 All India Village Electrification
Villiages Electrified (Nos)
10000All villages as per census 2011 has
been electrified on 28042018
Villages electrified
Average cost of supply(ACS)
(paiseunit)
i) Basic Infrastructure such as Distribution Transformer and Distribution lines are provided in the inhabited locality
as well as Dalit Basti hemlet where it exists (For electrification through Non-Conventional Energy Sources a
Distribution Transformer may not be necessary)
14 All India Coal consumption for Power Generation (MT)
520
Average Revenue Realization(paiseunit)
518
Year
ii) Electricity is provided to Public places like Schools Panchayat Office Health Centre Dispensaries Community
Centres etc and
iv) Mandatory Certification from Gram Panchayat regarding the completion of village electrification should be
obtained
13 Average cost of Power amp Average Realisation
iii) The number of households electrified should be at least 10 of the total number of households in the village
SN Contents Page
1 Capacity Addition Targets and Achievements in 12th Plan amp upto March2019 12
2 Capacity Addition Targets amp Achievements during Apr-2019 and Apr-19 to Apr-19 13
3 Installed Capacity in various Regions including their shares 14-19
Section B - Capacity Addition
(i) CAPACITY ADDTION TARGETS AND ACHIEVEMENTS IN THE 12TH PLAN Figures in MW
TARGET ACH TARGET ACH TARGET ACH TARGET ACH
CENTRAL 14878 15869 6004 2584 5300 2000 26182 20453
STATE 13922 22201 1608 2276 0 0 15530 24477
PRIVATE 43540 53661 3285 619 0 0 46825 54280
ALL INDIA 72340 91730 10897 5479 5300 2000 88537 99209
(ii) CAPACITY ADDITION TARGET AND ACHIEVEMENT FOR 2017-18 (IN MW)
THERMAL HYDRO NUCLEAR
TARGET ACH TARGET ACH TARGET ACH TARGET ACH
CENTRAL 4880 3170 800 390 500 6180 3560
STATE 3546 1760 300 200 0 3846 1960
PRIVATE 2940 3780 205 205 0 3145 3985
ALL INDIA 11366 8710 1305 795 500 0 13171 9505
(iii) CAPACITY ADDITION ACHIEVEMENT FOR 2018-19 (IN MW)
TARGET ACH TARGET ACH TARGET ACH TARGET ACH
CENTRAL 2760 1960 710 110 0 0 3470 2070
STATE 4506 2850 130 30 0 0 4636 2880
PRIVATE 0 972 0 0 0 0 0 972
ALL INDIA 7266 5782 840 140 0 0 8106 5922
12
SECTOR
SECTOR
TOTAL
TOTALNUCLEARHYDROTHERMAL
1 Capacity Addtion Targets and Achievements in the 12th Plan amp upto March2019
SECTORTHERMAL HYDRO NUCLEAR TOTAL
(MW)
Cummulative
Deviation
Target Achievement Target Achievement (+) (-)
Central 6040 500 0 500 0 -500
State 425615 660 0 660 0 -660
Private 0 0 0 0 0 0
Total 1029615 1160 0 1160 0 -1160
Central 600 0 0 0 0 0
State 21099 0 0 0 0 0
Private 379 0 0 0 0 0
Total 118999 0 0 0 0 0
Nuclear Central 700 0 0 0 0 0
Central 7340 500 0 500 0 -500
State 446714 660 0 660 0 -660
Private 379 0 0 0 0 0
Total 1218614 1160 0 1160 0 -1160
Electricity Generation (MU) Targets and Achievements for 2016-17
13
Hydro
All India
Capacity Addition TargetsAchievements during the Month of Apr-2019
Thermal
2 Capacity Addition Targets Achievements During Apr-2019
Schemes Sector
Target 2019-20
Apr-19 to Apr-19Apr-19
11
60
0 0
11
60
0 0 0 0
0
200
400
600
800
1000
1200
1400
Thermal Hydro Nuclear Total
MW
Targets and Achievement during 2019-20Target Achievement
0
200
400
600
800
1000
1200
Thermal Hydro Nuclear Total
1160
0 0
1160
0 0 00
MW
Target Achievement
Coal Lignite Gas Diesel Total
State 1634400 25000 287920 000 1947320 000 869755 69956 2887031
Private 2168083 108000 55800 000 2331883 000 251400 1312046 3895329
Central 1233537 25000 234406 000 1492943 162000 849622 37900 2542465
Sub Total 5036020 158000 578126 000 5772146 162000 1970777 1419902 9324825
State 2156000 104000 284982 000 2544982 000 544650 54789 3144421
Private 3474567 50000 467600 000 3992167 000 48100 2186476 6226743
Central 1650295 000 328067 000 1978362 184000 162000 66630 2390992
Sub Total 7280862 154000 1080649 000 8515511 184000 754750 2307894 11762155
State 1993250 000 79198 28788 2101236 000 1177483 58688 3337407
Private 1187450 25000 532210 27370 1772030 000 000 3749140 5521170
Central 1123502 289000 35958 000 1448460 332000 000 54190 1834650
Sub Total 4304202 314000 647366 56158 5321726 332000 1177483 3862018 10693227
State 624000 000 10000 000 634000 000 353792 27511 1015303
Private 638700 000 000 000 638700 000 39900 111637 790237
Central 1483664 000 000 000 1483664 000 100520 1000 1585184
Sub Total 2746364 000 10000 000 2756364 000 494212 140148 3390724
State 000 000 49771 3600 53371 000 42200 23325 118895
Private 000 000 2450 000 2450 000 000 6104 8554
Central 77002 000 125360 000 202362 000 100500 3000 305862
Sub Total 77002 000 177581 3600 258183 000 142700 32429 433311
State 000 000 000 4005 4005 000 000 525 4530
Private 000 000 000 000 000 000 000 738 738
Central 000 000 000 000 000 000 000 510 510
Sub Total 000 000 000 4005 4005 000 000 1773 5778
State 6407650 129000 711871 36393 7284913 000 2987880 234793 10507586
Private 7468800 183000 1058060 27370 8737230 000 339400 7366140 16442770
Central 5568000 314000 723791 000 6605791 678000 1212642 163230 8659663
Total 19444450 626000 2493722 63763 22627934 678000 4539922 7764163 35610019
Figures at decimal may not tally due to rounding off
Note -
(As per latest information available with MNRE)
Break up of RES all India as on 31032019 is given below (in MW)
459315 3562597 2818071 7764163
A 0 MW
B Apr 2019 0 MW
C
Apr 2019 0 MW
D Net Capacity Added during Apr 2019 A-B-C 0 MW
Sector wise breakup of RES capacity as shown is provisional
Share of installed capacity of BBMB Stations is included in state sector of partner states
BM PowerCogen Waste to Energy
910350 13830
Capacity Added during Apr 2019
Capacity Retired during
Capacity removed due to change
from Conventional to RES during
Islands
ALL INDIA
Abbreviation- SHP=Small Hydro Project (le 25 MW) BP=Biomass Power UampI=Urban amp Industrial Waste Power RES=Renewable Energy Sources
1 RES include SHP BP UampI Solar and Wind Energy Installed capacity in respect of RES (MNRE) as on 31032019
Small
Hydro PowerWind Power
Bio-PowerSolar Power
Total
Capacity
RES
(MNRE)
Northern Region
Western Region
Southern Region
Eastern Region
North Eastern
Region
ALL INDIA INSTALLED CAPACITY (IN MW) OF POWER STATIONS
(As on 30042019)
(UTILITIES)
Region Ownership Sector
Mode wise breakup
Grand TotalThermalNuclear Hydro
Coal Lignite Gas Diesel Total
State 13500 000 180040 000 193540 000 000 000 193540
Private 86922 000 10800 000 97722 000 000 17889 115611
Central 311272 000 20701 000 331973 10283 72309 000 414565
Sub-Total 411694 000 211541 000 623235 10283 72309 17889 723716
State 272000 000 15000 000 287000 000 110282 6930 404212
Private 408078 000 000 000 408078 000 20000 34512 462590
Central 129472 000 53561 000 183034 10094 66370181 500 259998
Sub-Total 809550 000 68561 000 878112 10094 196652 41942 1126799
State 000 000 000 000 000 000 69460 25661 95121
Private 000 000 000 000 000 000 99200 62668 161868
Central 18340 000 6201 000 24541 2895 122388 000 149824
Sub-Total 18340 000 6201 000 24541 2895 291048 88329 406813
State 000 000 17500 000 17500 000 123000 12903 153403
Private 000 000 000 000 000 000 000 6483 6483
Central 50639 000 12907 000 63547 6798 109188 000 179533
Sub-Total 50639 000 30407 000 81047 6798 232188 19386 339419
State 176000 000 15000 000 191000 000 259770 12780 463550
Private 511550 000 000 000 511550 000 28800 115462 655812
Central 85458 000 26401 000 111859 19681 92342 000 223882
Sub-Total 773008 000 41401 000 814409 19681 380912 128242 1343244
State 626000 25000 60380 000 711380 000 109618 2385 823383
Private 280200 108000 000 000 388200 000 10400 730181 1128781
Central 95625 25000 22110 000 142735 55674 73901 34400 306710
Sub-Total 1001825 158000 82490 000 1242315 55674 193919 766966 2258874
State 546900 000 000 000 546900 000 72410 2510 621820
Private 871433 000 000 000 871433 000 84200 288760 1244393
Central 379639 000 54949 000 434588 28948 180253 3000 646789
Sub-Total 1797972 000 54949 000 1852921 28948 336863 294270 2513002
State 000 000 000 000 000 000 125215 6787 132002
Private 9900 000 45000 000 54900 000 8800 52620 116320
Central 34324 000 6966 000 41290 3124 47554 000 91968
Sub-Total 44224 000 51966 000 96190 3124 181569 59407 340290
State 000 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 000 3471 3471
Central 3815 000 1503 000 5317 801 10171 000 16289
Sub-Total 3815 000 1503 000 5317 801 10171 3471 19760
124953 000 29105 000 154058 23703 75145 000 252907
State 1634400 25000 287920 000 1947320 000 869755 69956 2887031
Private 2168083 108000 55800 000 2331883 000 251400 1312046 3895329
Central 1233537 25000 234406 000 1492943 162000 849622 37900 2542465
Grand Total 5036020 158000 578126 000 5772146 162000 1970777 1419902 9324825
Delhi
Haryana
Himachal Pradesh
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
NORTHERN REGION
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
(As on 30042019)
State Ownership Sector
Mode wise breakup
Grand TotalThermalNuclear Hydro
RES
(MNRE)
Jammu amp Kashmir
Punjab
Rajasthan
Uttar Pradesh
Uttarakhand
Chandigarh
Central - Unallocated
Total (Northern
Region)
(As on 30042019)
Coal Lignite Gas Diesel Total
State 000 000 000 000 000 000 000 005 005
Private 000 000 4800 000 4800 000 000 392 5192
Central 46959 000 1967 000 48926 2600 000 000 51526
Sub-Total 46959 000 6767 000 53726 2600 000 397 56723
State 000 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 000 1447 1447
Central 14141 000 4334 000 18475 700 000 000 19175
Sub-Total 14141 000 4334 000 18475 700 000 1447 20622
State 371000 104000 217782 000 692782 000 77200 6470 776452
Private 726567 50000 396000 000 1172567 000 000 833180 2005747
Central 324243 000 42400 000 366643 55900 000 24330 446873
Sub-Total 1421810 154000 656182 000 2231992 55900 77200 863980 3229072
State 540000 000 000 000 540000 000 170366 8396 718762
Private 617400 000 10000 000 627400 000 000 418040 1045440
Central 334238 000 25700 000 359938 27300 152000 30000 569238
Sub-Total 1491638 000 35700 000 1527338 27300 322366 456436 2333440
State 228000 000 000 000 228000 000 12000 1105 241105
Private 885000 000 000 000 885000 000 000 52430 937430
Central 211075 000 000 000 211075 4800 10000 000 225875
Sub-Total 1324075 000 000 000 1324075 4800 22000 53535 1404410
State 1017000 000 67200 000 1084200 000 285084 38813 1408097
Private 1245600 000 56800 000 1302400 000 48100 880441 2230941
Central 466780 000 227273 000 694053 69000 000 12300 775353
Sub-Total 2729380 000 351273 000 3080653 69000 333184 931553 4414390
State 000 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 000 546 546
Central 19560 000 6634 000 26194 900 000 000 27094
Sub-Total 19560 000 6634 000 26194 900 000 546 27640
233300 000 19759 000 253059 22800 000 000 275859
State 2156000 104000 284982 000 2544982 000 544650 54789 3144421
Private 3474567 50000 467600 000 3992167 000 48100 2186476 6226743
Central 1650295 000 328067 000 1978362 184000 162000 66630 2390992
Grand Total 7280862 154000 1080649 000 8515511 184000 754750 2307894 11762155
Goa
Daman amp Diu
Gujarat
Madhya Pradesh
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
WESTERN REGION
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
ThermalNuclear Hydro
RES
(MNRE)
State Ownership Sector
Mode wise breakup
Grand Total
Chhattisgarh
Maharashtra
Dadra amp Nagar
Naveli
Central - Unallocated
Total (Western
Region)
(As on 30042019)
Coal Lignite Gas Diesel Total
State 501000 000 23540 000 524540 000 167360 5618 697518
Private 387388 000 381318 3680 772386 000 000 743342 1515728
Central 154683 12773 000 000 167456 12727 000 25000 205183
Sub-Total 1043071 12773 404858 3680 1464382 12727 167360 773960 2418429
State 558250 000 000 000 558250 000 247993 4122 810365
Private 83945 000 83182 000 167127 000 000 393644 560771
Central 180685 14927 000 000 195612 14873 000 1000 211485
Sub-Total 822880 14927 83182 000 920989 14873 247993 398766 1582621
State 502000 000 000 12792 514792 000 358660 19389 892841
Private 195850 000 000 2520 198370 000 000 1363591 1561961
Central 242780 40140 000 000 282920 69800 000 000 352720
Sub-Total 940630 40140 000 15312 996082 69800 358660 1382979 2807521
State 000 000 000 15996 15996 000 185650 17290 218936
Private 61500 000 17400 000 78900 000 000 19021 97921
Central 86142 28180 35958 000 150280 36200 000 5000 191480
Sub-Total 147642 28180 53358 15996 245176 36200 185650 41311 508337
State 432000 000 52408 000 484408 000 217820 12270 714498
Private 458767 25000 50310 21170 555247 000 000 1229228 1784475
Central 302532 136420 000 000 438952 144800 000 23190 606942
Sub-Total 1193299 161420 102718 21170 1478607 144800 217820 1264688 3105915
State 000 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 000 000 000
Central 000 10000 000 000 10000 000 000 000 10000
Sub-Total 000 10000 000 000 10000 000 000 000 10000
State 000 000 3250 000 3250 000 000 000 3250
Private 000 000 000 000 000 000 000 314 314
Central 14080 10760 000 000 24840 8600 000 000 33440
Sub-Total 14080 10760 3250 000 28090 8600 000 314 37004
142600 35800 000 000 178400 45000 000 000 223400
State 1993250 000 79198 28788 2101236 000 1177483 58688 3337407
Private 1187450 25000 532210 27370 1772030 000 000 3749140 5521170
Central 1123502 289000 35958 000 1448460 332000 000 54190 1834650
Grand Total 4304202 314000 647366 56158 5321726 332000 1177483 3862018 10693227
Kerala
Andhra Pradesh
Telangana
Karnataka
Total (Southern
Region)
Tamil Nadu
NLC
Puducherry
Central - Unallocated
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
SOUTHERN REGION
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
State Ownership Sector
Mode wise breakup
Grand TotalThermalNuclear Hydro
RES
(MNRE)
(As on 30042019)
Coal Lignite Gas Diesel Total
State 000 000 000 000 000 000 000 7070 7070
Private 28100 000 000 000 28100 000 000 25545 53645
Central 384933 000 000 000 384933 000 11000 000 395932
Sub-Total 413033 000 000 000 413033 000 11000 32615 456647
State 42000 000 000 000 42000 000 13000 405 55405
Private 73000 000 000 000 73000 000 000 3495 76495
Central 39374 000 000 000 39374 000 6100 000 45474
Sub-Total 154374 000 000 000 154374 000 19100 3900 177374
State 540000 000 10000 000 550000 000 98600 12195 660795
Private 243700 000 000 000 243700 000 000 35250 278950
Central 76077 000 000 000 76077 000 41000 000 117077
Sub-Total 859777 000 10000 000 869777 000 139600 47445 1056822
State 000 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 000 000 000
Central 698504 000 000 000 698504 000 18620 000 717124
Sub-Total 698504 000 000 000 698504 000 18620 000 717124
State 42000 000 000 000 42000 000 206192 2630 250822
Private 293900 000 000 000 293900 000 000 47346 341246
Central 163390 000 000 000 163390 000 8900 1000 173290
Sub-Total 499290 000 000 000 499290 000 215092 50976 765358
State 000 000 000 000 000 000 36000 5211 41211
Private 000 000 000 000 000 000 39900 001 39901
Central 8703 000 000 000 8703 000 6400 000 15103
Sub-Total 8703 000 000 000 8703 000 82300 5212 96215
112683 000 000 000 112683 000 8501 000 121184
State 624000 000 10000 000 634000 000 353792 27511 1015303
Private 638700 000 000 000 638700 000 39900 111637 790237
Central 1483664 000 000 000 1483664 000 100520 1000 1585184
Grand Total 2746364 000 10000 000 2756364 000 494212 140148 3390724
Total (Eastern
Region)
Bihar
Jharkhand
West Bengal
DVC
Odisha
Sikkim
Central - Unallocated
HydroOwnership Sector
Mode wise breakup
Grand TotalThermalNuclear
RES
(MNRE)
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
State
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
EASTERN REGION
(As on 30042019)
Coal Lignite Gas Diesel Total
State 000 000 32821 000 32821 000 10000 501 43322
Private 000 000 2450 000 2450 000 000 2650 5100
Central 40852 000 43556 000 84408 000 35708 2500 122616
Sub-Total 40852 000 78827 000 119679 000 45708 5651 171038
State 000 000 000 000 000 000 000 10711 10711
Private 000 000 000 000 000 000 000 2939 2939
Central 3705 000 4682 000 8387 000 11655 000 20042
Sub-Total 3705 000 4682 000 8387 000 11655 13650 33692
State 000 000 000 000 000 000 32200 3253 35453
Private 000 000 000 000 000 000 000 012 012
Central 4560 000 10969 000 15529 000 7227 000 22756
Sub-Total 4560 000 10969 000 15529 000 39427 3265 58221
State 000 000 16950 000 16950 000 000 1601 18551
Private 000 000 000 000 000 000 000 009 009
Central 5610 000 43695 000 49305 000 6849 500 56654
Sub-Total 5610 000 60645 000 66255 000 6849 2110 75214
State 000 000 000 3600 3600 000 000 545 4145
Private 000 000 000 000 000 000 000 344 344
Central 4710 000 7157 000 11867 000 9534 000 21401
Sub-Total 4710 000 7157 3600 15467 000 9534 889 25890
State 000 000 000 000 000 000 000 3067 3067
Private 000 000 000 000 000 000 000 100 100
Central 3210 000 4893 000 8103 000 5733 000 13836
Sub-Total 3210 000 4893 000 8103 000 5733 3167 17003
State 000 000 000 000 000 000 000 3647 3647
Private 000 000 000 000 000 000 000 050 050
Central 3105 000 4046 000 7151 000 9794 000 16945
Sub-Total 3105 000 4046 000 7151 000 9794 3697 20642
11250 000 6362 000 17612 000 14000 000 31612
State 000 000 49771 3600 53371 000 42200 23325 118895
Private 000 000 2450 000 2450 000 000 6104 8554
Central 77002 000 125360 000 202362 000 100500 3000 305862
Grand Total 77002 000 177581 3600 258183 000 142700 32429 433311
Assam
Arunachal Pradesh
Meghalaya
Tripura
Manipur
Nagaland
Mizoram
Central - Unallocated
Total (North-
Eastern Region)
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
NORTH-EASTERN REGION
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
State Ownership Sector
Mode wise breakup
Grand TotalThermalNuclear Hydro
RES
(MNRE)
(As on 30042019)
Coal Lignite Gas Diesel Total
State 000 000 000 4005 4005 000 000 525 4530
Private 000 000 000 000 000 000 000 663 663
Central 000 000 000 000 000 000 000 510 510
Sub-Total 000 000 000 4005 4005 000 000 1698 5703
State 000 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 000 075 075
Central 000 000 000 000 000 000 000 000 000
Sub-Total 000 000 000 000 000 000 000 075 075
State 000 000 000 4005 4005 000 000 525 4530
Private 000 000 000 000 000 000 000 738 738
Central 000 000 000 000 000 000 000 510 510
Grand Total 000 000 000 4005 4005 000 000 1773 5778
Andaman amp
Nicobar
Lakshadweep
Total (Islands)
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
ISLANDS
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
State Ownership Sector
Mode wise breakup
Grand TotalThermalNuclear Hydro
RES
(MNRE)
SrNo Contents Page
1 Executive summary of Target and Achievement of Transmission Lines during 2019-20
20(1)
2 List of Transmission Lines CommissionedReady for commissioning during Apr-2019 20(2)
Section C - Transmission Lines
1 Executive summary of Target and Achievement of Transmission Lines during 2019-20 As on 30-04-19
(All figures in circuit kms)
Ce
ntr
al S
ecto
r
Sta
te S
ecto
r
JV
Pri
va
te S
ecto
r
To
tal
Ce
ntr
al S
ecto
r
Sta
te S
ecto
r
JV
Pri
va
te S
ecto
r
To
tal
Ce
ntr
al S
ecto
r
Sta
te S
ecto
r
JV
Pri
va
te S
ecto
r
To
tal
Ce
ntr
al S
ecto
r
Sta
te S
ecto
r
JV
Pri
va
te S
ecto
r
To
tal
Ce
ntr
al S
ecto
r
Sta
te S
ecto
r
JV
Pri
va
te S
ecto
r
To
tal
Ce
ntr
al
Se
cto
r
Sta
te S
ec
tor
JV
Pri
va
te S
ec
tor
Gra
nd
To
tal
0 0 0 0 0 0 0 0 2727 958 2334 6019 2239 3416 1143 6798 781 10023 0 10804 5747 14397 3477 23621
Apr19 Programme 0 0 0 0 0 0 0 0 577 416 557 1550 60 890 203 1153 0 309 0 309 637 1615 760 3012
Achievement 0 0 0 0 0 0 0 0 53 0 0 53 0 20 0 20 0 401 0 401 53 421 0 474
Upto Apr-19 Programme 0 0 0 0 0 0 0 0 577 416 557 1550 60 890 203 1153 0 309 0 309 637 1615 760 3012
Achievement 0 0 0 0 0 0 0 0 53 0 0 53 0 20 0 20 0 401 0 401 53 421 0 474
20(1)
220 kV Grand Total 800 kV 500 kV
Programme 2019-20
Programme
Achievement
HVDC765 kV 400 kV
Line
1 2 3 4 5 6
1 400 Bhadla (PG) - Bhadla (RVPN) line DC PGCIL 53
53
2 400 LILO of one ckt Jhanor - Navsari at Vav Ss DC GETCO 20
3 220 Banda-Chitrakoot Line DC UPPTCL 226
4 220 Gorakhpur (PG)-Gola line DC UPPTCL 82
5 220 Hapur(765) - Faridnagar line SC UPPTCL 11
6 220 Kalikiri - Madanapalli line DC APTRANSCO 60
7 220LILO of Gr Noida -Noida Sec-129 at Noida
Sec-148DC UPPTCL 1
8 220LILO of one Ckt of Badshahpur Pali at Sec-
65 GurgaonDC HVPNL 3
9 220 Sultanpur-Sangipur LILO Section at Amethi DC UPPTCL 18
421
0
474
20(2)
Grand Total
2Transmission Lines (220 kV and above) CommissionedReady for commissioning During Apr-2019
Voltage
Level (kV)Name of Transmission Lines
Circuit
Type
Executing
Agency
CENTRAL SECTOR
Total of CENTRAL SECTOR
STATE SECTOR Sector
Total of STATE SECTOR
PRIVATE SECTOR
Total of PRIVATE SECTOR
SlNo
Length(CKm)
As on 30-04-19
SN Contents Page
1 Executive summary of Target and Achievement of Substations during 2019-20 21(1)
2Sub Stations (220 kV and above) commissionedready for commisssioning during Apr-
201921(2)
Section D - Sub Stations
1 Executive summary of Target and Achievement of Substations during 2019-2020 As on 30-04-19
(All figures in circuit MVA)
Ce
ntr
al S
ecto
r
Sta
te S
ecto
r
JV
Pri
va
te S
ecto
r
To
tal
Ce
ntr
al S
ecto
r
Sta
te S
ecto
r
JV
Pri
va
te S
ecto
r
To
tal
Ce
ntr
al S
ecto
r
Sta
te S
ecto
r
JV
Pri
va
te S
ecto
r
To
tal
Ce
ntr
al S
ecto
r
Sta
te S
ecto
r
JV
Pri
va
te S
ecto
r
To
tal
Ce
ntr
al S
ecto
r
Sta
te S
ecto
r
JV
Pri
va
te S
ecto
r
To
tal
Ce
ntr
al S
ec
tor
Sta
te S
ec
tor
JV
Pri
va
te S
ec
tor
Gra
nd
To
tal
3000 0 0 3000 0 0 0 0 18000 3000 6000 27000 5205 19665 4260 29130 800 21786 0 22586 27005 44451 10260 81716
Apr19 Programme 0 0 0 0 0 0 0 0 3000 0 3000 6000 0 1000 2000 3000 0 800 0 800 3000 1800 5000 9800
Achievement 0 0 0 0 0 0 0 0 500 0 0 500 815 1980 0 2795 0 1305 0 1305 1315 3285 0 4600
Upto Apr-19 Programme 0 0 0 0 0 0 0 0 3000 0 3000 6000 0 1000 2000 3000 0 800 0 800 3000 1800 5000 9800
Achievement 0 0 0 0 0 0 0 0 500 0 0 500 815 1980 0 2795 0 1305 0 1305 1315 3285 0 4600
21(1)
220 kV Grand Total 800 kV 500 kV
Programme 2019-20
Programme
Achievement
HVDC765 kV 400 kV
As on 30-04-19
Sl Voltage Ratio Capacity
No (kVkV) (MWMVA)
1 2 3 4 5
1 Bhadla SS (3x1500 3x500 MVA) 765400 PGCIL 500
2 Extn at Tumkur (Pavagada ) PS (2x500 MVA) 400220 PGCIL 500
3 Bongaigaon (2nd ICT) Ss 400220 PGCIL 315
Total of CENTRAL SECTOR 1315
4 Motiram Adda Gorakhpur (Aug) (Additional TF) 400220 UPPTCL 240
5 Muradnagar-II Ghaziabad (Aug) (Additional TF) 400220 UPPTCL 240
6 Noida Sec- 148 GBNagar (New) 400220 UPPTCL 5007 Sarnath Varanasi (Aug) TF- II (500-315) 400220 UPPTCL 1858 Sarojininagar Lucknow Aug) TF- II (500-315) 400220 UPPTCL 185
9 Unnao (Aug) TF-III 400220 UPPTCL 31510 Nawada SS 400220 HVPNL 31511 Kharepatan SS 22033 MSETCL 2512 Prathipadu SS 220132 APTRANSCO 10013 Pali Ss 22066 HVPNL 160
14 A-5 Faridabad Ss 22066 HVPNL 60
15 Rentachintala Ss Aug(3X100-2x100) 220132 APTRANSCO 10016 Amethi Ss 220132 UPPTCL 160
17 Gajokhar Varanasi (Aug) TF- II (160-100) 220132 UPPTCL 60
18 Gola Gorakhpur (New) 220132 UPPTCL 160
19 Khurja Bulandshahr (Aug) TF- II (200-160) 220132 UPPTCL 40
20 RC Green GB Nagar (Aug) TF-II (160-100) 220132 UPPTCL 60
21 Sikandrabad Bulandshahr (Aug) (Additional TF) 220132 UPPTCL 160
22 Sitapur (Aug) (Additional TF) 220132 UPPTCL 160
23 Sohawal Ayodhya (Aug) TF-II (160-100) 220132 UPPTCL 60
TOTAL STATE SECTOR 3285
GRAND TOTAL 4600
21(2)
CENTRAL SECTOR
STATE SECTOR
2Sub-Stations (220 kV and above) CommissionedReady for commissioning During Apr-2019
Name of Sub Stations Executing Agency
SN Contents Page
1 Electricity Generation (MU) Targets and Achievements for 2019-20 22
Section E - Electricity Generation
Programme Achievement Ach Programme Achievement Ach
Central Sector 37545100 3177900 3129530 9848 3177900 3129530 9848
State Sector 37498600 3322500 2950558 8881 3322500 2950558 8881
PvtIPP Sector 37346200 3236400 3195940 9875 3236400 3195940 9875
PvtUTL Sector 1823100 159300 165579 10394 159300 165579 10394
Total 114213000 9896100 9441607 9541 9896100 9441607 9541
Central Sector 5661700 386100 481390 12468 386100 481390 12468
State Sector 6680500 498200 536514 10769 498200 536514 10769
PvtIPP Sector 1206900 57300 80405 14032 57300 80405 14032
PvtUTL Sector 144100 12300 10930 8886 12300 10930 8886
Total 13693200 953900 1109239 11628 953900 1109239 11628
Central Sector 4472000 367300 317765 8651 367300 317765 8651
Total 4472000 367300 317765 8651 367300 317765 8651
Bhutan Import 621800 17500 24396 13941 17500 24396 13941
Central Sector 47678800 3931300 3928685 9993 3931300 3928685 9993
State Sector 44179100 3820700 3487072 9127 3820700 3487072 9127
Pvt Sector 40520300 3465300 3452854 9964 3465300 3452854 9964
Total 133000000 11234800 10893007 9696 11234800 10893007 9696
Provisional based on actual-cum-Assesment
Figs in MU
Cummulative
Achievement
Cummulative
Achievement
Mar-19 Mar-18 Upto Mar-2019 Upto Mar-2018
984785 869291 12675910 10183949
22
1 Electricity Generation (MU) Targets and Achievememts for 2019-20
All India Energy Generation During Apr-19 to Apr-19 (MU)
Target (2019-20)Apr-19 to Apr-19
Sector
Hydro
Thermal
Nuclear
Renewable Energy Generation
Achievement
Apr-2019
98961
95393673
112348
94416
11092
3178
108930
0
20000
40000
60000
80000
100000
120000
Thermal Hydro Nuclear Total
Programme
Achievement
SN Contents Page
1 Energy Power Supply Position (Provisional) for Apr-2019 and during Apr-19 to Apr-19 23
2 Peak Power Supply Position (Provisional) for Apr-2019 and during Apr-19 to Apr-19 24
3 Energy Power Supply Position (Revised) for Mar-2019 and during Apr-19 to Mar-19 25
4 Peak Power Supply Position (Revised) for Mar-2019 and during Apr-19 to Mar-19 26
5 Notified Power cuts Restrictions on Industries during Apr-2019 27
6 Power Supply to Agricultural Sector during Apr-2019 28
Section F - Power supply position
आकड़ मममलयन यननट नट Figures in MU net
ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied
कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )
चडीगढ़ Chandigarh 117 117 0 00 117 117 0 00
दिलली Delhi 2698 2698 1 00 2698 2698 1 00
हरियजणज Haryana 3773 3773 0 00 3773 3773 0 00
दहमजचल परिश Himachal Pradesh 777 777 0 00 777 777 0 00
रमम कशमीि Jammu amp Kashmir 1604 1296 308 192 1604 1296 308 192
परजब Punjab 3646 3646 0 00 3646 3646 0 00
िजरसथजन Rajasthan 6210 6208 2 00 6210 6208 2 00
उतति परिश Uttar Pradesh 10179 10148 32 03 10179 10148 32 03
उततिजखड Uttarakhand 1120 1120 0 00 1120 1120 0 00
उततरी कषतर Northern Region 30094 29786 308 10 30094 29786 308 10
छततीसगढ़ Chhattisgarh 2684 2676 8 03 2684 2676 8 03
गरिजत Gujarat 10718 10718 0 00 10718 10718 0 00
मधय परिश Madhya Pradesh 6006 6006 0 00 6006 6006 0 00
महजिजषटर Maharashtra 14308 14308 0 00 14308 14308 0 00
िमन औि दिउ Daman amp Diu 220 220 0 00 220 220 0 00
िजिि व नगि हवली Dadra amp Nagar Haveli 552 552 0 00 552 552 0 00
गोवज Goa 388 388 0 00 388 388 0 00
पशचिमी कषतर Western Region 34875 34868 8 00 34875 34868 8 00
आनधर परिश Andhra Pradesh 5708 5708 0 00 5708 5708 0 00
तलगजनज Telangana 5725 5725 0 00 5725 5725 0 00
कनजाटक Karnataka 7003 7003 0 00 7003 7003 0 00
किल Kerala 2402 2400 2 01 2402 2400 2 01
तममल नजड Tamil Nadu 10010 10010 0 00 10010 10010 0 00
पडचिी Puducherry 263 263 0 00 263 263 0 00
लकष-दवीप Lakshadweep 4 4 0 0 4 4 0 0
दकषकषणी कषतर Southern Region 31111 31109 2 00 31111 31109 2 00
बबहजि Bihar 2589 2589 0 00 2589 2589 0 00
िजमोिि घजटी ननगम DVC 1772 1772 0 00 1772 1772 0 00
झजिखणड Jharkhand 689 689 0 00 689 689 0 00
ओडडशज Odisha 2689 2689 1 00 2689 2689 1 00
पशशचम बगजल West Bengal 5075 5075 0 00 5075 5075 0 00
मसशककम Sikkim 37 37 0 00 37 37 0 00
अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 7 29 27 2 7
परवी कषतर Eastern Region 12851 12850 1 00 12851 12850 1 00
अरणजचल परिश Arunachal Pradesh 66 66 0 05 66 66 0 05
असम Assam 766 709 57 75 766 709 57 75
मणणपि Manipur 68 67 1 15 68 67 1 15
मघजलय Meghalaya 170 160 10 59 170 160 10 59
ममज़ोिम Mizoram 54 53 0 08 54 53 0 08
नजगजलड Nagaland 54 54 0 08 54 54 0 08
बिपिज Tripura 122 120 1 12 122 120 1 12
उततर-परवी कषतर North-Eastern Region 1300 1228 71 55 1300 1228 71 55
समपणण भारत All India 110231 109842 389 04 110231 109842 389 04
23
ऊरजा पनत ा म कमी ऊरजा पनत ा म कमीEnergy not Supplied
Excludes energy exported to Bangladesh
Energy not Supplied
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
ऊराण वरवदयत आपरत ण शथिरत ररपोरण (परवाणरवलोकन) Energy Power Supply Position Report (Provisional)
राजयState
अपरल 2019 April2019 अपरल2019 -अपरल2019 April2019 to April2019
अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met
कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )
चडीगढ़ Chandigarh 256 256 0 00 256 256 0 00
दिलली Delhi 5664 5664 0 00 5664 5664 0 00
हरियजणज Haryana 8127 8127 0 00 8127 8127 0 00
दहमजचल परिश Himachal Pradesh 1387 1387 0 00 1387 1387 0 00
रमम कशमीि Jammu amp Kashmir 2826 2261 565 200 2826 2261 565 200
परजब Punjab 7015 7015 0 00 7015 7015 0 00
िजरसथजन Rajasthan 10560 10560 0 00 10560 10560 0 00
उतति परिश Uttar Pradesh 19935 19935 0 00 19935 19935 0 00
उततिजखड Uttarakhand 1922 1922 0 00 1922 1922 0 00
उततरी कषतर Northern Region 54476 53985 491 09 54476 53985 491 09
छततीसगढ़ Chhattisgarh 4596 4574 22 05 4596 4574 22 05
गरिजत Gujarat 17871 17865 6 00 17871 17865 6 00
मधय परिश Madhya Pradesh 10018 10018 0 00 10018 10018 0 00
महजिजषटर Maharashtra 23158 23150 8 00 23158 23150 8 00
िमन औि दिउ Daman amp Diu 341 340 1 02 341 340 1 02
िजिि व नगि हवली Dadra amp Nagar Haveli 818 818 0 00 818 818 0 00
गोवज Goa 594 594 0 00 594 594 0 00
पशचिमी कषतर Western Region 56242 56222 20 00 56242 56222 20 00
आनधर परिश Andhra Pradesh 9151 9151 0 00 9151 9151 0 00
तलगजनज Telangana 10191 10191 0 00 10191 10191 0 00
कनजाटक Karnataka 12681 12681 0 00 12681 12681 0 00
किल Kerala 4309 4300 8 02 4309 4300 8 02
तममल नजड Tamil Nadu 15972 15972 0 00 15972 15972 0 00
पडचिी Puducherry 482 480 2 05 482 480 2 05
लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0
दकषकषणी कषतर Southern Region 49155 49103 52 01 49155 49103 52 01
बबहजि Bihar 5357 5357 0 00 5357 5357 0 00
िजमोिि घजटी ननगम DVC 3039 3039 0 00 3039 3039 0 00
झजिखणड Jharkhand 1266 1266 0 00 1266 1266 0 00
ओडडशज Odisha 5389 5389 0 00 5389 5389 0 00
पशशचम बगजल West Bengal 8666 8666 0 00 8666 8666 0 00
मसशककम Sikkim 100 100 0 00 100 100 0 00
अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7
परवी कषतर Eastern Region 23349 23349 0 00 23349 23349 0 00
अरणजचल परिश Arunachal Pradesh 139 136 3 22 139 136 3 22
असम Assam 1712 1667 45 26 1712 1667 45 26
मणणपि Manipur 197 188 9 46 197 188 9 46
मघजलय Meghalaya 336 336 0 00 336 336 0 00
ममज़ोिम Mizoram 116 113 3 26 116 113 3 26
नजगजलड Nagaland 157 131 26 166 157 131 26 166
बिपिज Tripura 292 291 1 03 292 291 1 03
उततर-परवी कषतर North-Eastern Region 2848 2780 68 24 2848 2780 68 24
समपणण भारत All India 177411 176810 601 03 177411 176810 601 03
24
मजग की पनत ा म कमी Demand not Met
Excludes the supply to Bangladesh
राजयStateअपरल 2019 April2019
मजग की पनत ा म कमी Demand not Met
अधिकतम वरवदयत आपरत ण शथिरत ररपोरण (परवाणरवलोकन) Peak Power Supply Position Report (Provisional)
आकड़ मगज वजट नट Figures in MW netअपरल2019 -अपरल2019 April2019 to April2019
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
आकड़ मममलयन यननट नट Figures in MU net
ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied
कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )
चडीगढ़ Chandigarh 96 96 0 00 1561 1561 0 00
दिलली Delhi 1931 1930 1 00 32299 32282 17 01
हरियजणज Haryana 3658 3658 0 00 53665 53665 0 00
दहमजचल परिश Himachal Pradesh 832 830 2 02 9850 9618 232 24
रमम कशमीि Jammu amp Kashmir 1767 1414 353 200 19593 15868 3725 190
परजब Punjab 3585 3585 0 00 55288 55275 13 00
िजरसथजन Rajasthan 6774 6770 4 01 79826 79637 189 02
उतति परिश Uttar Pradesh 8754 8691 63 07 117101 116118 984 08
उततिजखड Uttarakhand 1067 1067 0 00 13845 13753 92 07
उततरी कषतर Northern Region 28464 28041 423 15 383028 377776 5251 14
छततीसगढ़ Chhattisgarh 2464 2457 8 03 26130 26076 54 02
गरिजत Gujarat 9890 9890 0 00 116588 116572 15 00
मधय परिश Madhya Pradesh 6236 6236 0 00 75667 75665 2 00
महजिजषटर Maharashtra 13631 13631 0 00 158285 158148 137 01
िमन औि दिउ Daman amp Diu 221 221 0 00 2557 2557 0 00
िजिि व नगि हवली Dadra amp Nagar Haveli 553 553 0 00 6317 6317 0 00
गोवज Goa 362 362 0 00 4283 4280 3 01
पशचिमी कषतर Western Region 33357 33349 8 00 389827 389615 212 01
आनधर परिश Andhra Pradesh 6072 6071 1 00 63735 63677 58 01
तलगजनज Telangana 6930 6929 1 00 66697 66635 62 01
कनजाटक Karnataka 7614 7612 1 00 71759 71690 69 01
किल Kerala 2489 2488 1 00 25029 24911 118 05
तममल नजड Tamil Nadu 10247 10245 2 00 109375 109273 102 01
पडचिी Puducherry 252 251 1 04 2761 2751 10 03
लकष-दवीप Lakshadweep 4 4 0 0 46 46 0 0
दकषकषणी कषतर Southern Region 33605 33597 8 00 339355 338938 417 01
बबहजि Bihar 2319 2318 1 00 30052 29827 225 07
िजमोिि घजटी ननगम DVC 1773 1772 1 00 22365 21995 369 17
झजिखणड Jharkhand 698 697 1 01 8682 8461 221 25
ओडडशज Odisha 2583 2582 1 00 31810 31781 30 01
पशशचम बगजल West Bengal 4585 4584 2 00 52237 52078 159 03
मसशककम Sikkim 41 41 0 00 513 512 0 01
अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 67 346 323 23 67
परवी कषतर Eastern Region 11999 11995 5 00 145658 144654 1004 07
अरणजचल परिश Arunachal Pradesh 61 60 0 06 864 855 9 10
असम Assam 680 656 23 34 9532 9204 328 34
मणणपि Manipur 68 68 1 09 916 906 10 11
मघजलय Meghalaya 173 173 0 03 1955 1953 1 01
ममज़ोिम Mizoram 50 49 0 09 668 661 8 12
नजगजलड Nagaland 58 57 1 20 902 809 93 103
बिपिज Tripura 150 150 0 00 1859 1837 21 11
उततर-परवी कषतर North-Eastern Region 1240 1214 26 21 16696 16225 471 28
समपणण भारत All India 108665 108196 469 04 1274564 1267209 7355 06
Note The revised data for March 2019 is not avaliable
Excludes energy exported to Bangladesh
राजयState
ऊराण वरवदयत आपरत ण शथिरत ररपोरण (परवाणरवलोकन) Energy Power Supply Position Report (Provisional)
25
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
Energy not Supplied Energy not Supplied
मािण2019 March2019 अपरल2018 -मािण2019 April2018 to March2019
ऊरजा पनत ा म कमी ऊरजा पनत ा म कमी
अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met
कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )
चडीगढ़ Chandigarh 223 223 0 00 369 369 0 00
दिलली Delhi 4016 4016 0 00 7016 7016 0 00
हरियजणज Haryana 6544 6544 0 00 10270 10270 0 00
दहमजचल परिश Himachal Pradesh 1683 1683 0 00 1700 1700 0 00
रमम कशमीि Jammu amp Kashmir 3277 2622 655 200 3277 2622 655 200
परजब Punjab 6564 6564 0 00 12638 12638 0 00
िजरसथजन Rajasthan 11885 11885 0 00 13276 13276 0 00
उतति परिश Uttar Pradesh 16220 16220 0 00 20498 20062 436 21
उततिजखड Uttarakhand 2002 2002 0 00 2216 2216 0 00
उततरी कषतर Northern Region 47925 47356 569 12 63166 61726 1440 23
छततीसगढ़ Chhattisgarh 4444 4128 316 71 4444 4270 174 39
गरिजत Gujarat 16263 16263 0 00 17053 16963 90 05
मधय परिश Madhya Pradesh 12328 12323 5 00 13815 13815 0 00
महजिजषटर Maharashtra 22361 22291 70 03 23864 23254 610 26
िमन औि दिउ Daman amp Diu 336 336 0 01 357 356 1 02
िजिि व नगि हवली Dadra amp Nagar Haveli 800 799 1 01 816 815 1 01
गोवज Goa 538 538 0 00 596 596 0 00
पशचिमी कषतर Western Region 53132 52965 167 03 56675 55821 853 15
आनधर परिश Andhra Pradesh 8977 8977 0 00 9459 9453 6 01
तलगजनज Telangana 10471 10471 0 00 10815 10815 0 00
कनजाटक Karnataka 12841 12841 0 00 12841 12841 0 00
किल Kerala 4264 4228 36 09 4264 4228 36 09
तममल नजड Tamil Nadu 15712 15712 0 00 15712 15712 0 00
पडचिी Puducherry 427 412 15 34 427 412 15 34
लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0
दकषकषणी कषतर Southern Region 49464 49464 0 00 49464 49464 0 00
बबहजि Bihar 4633 4633 0 00 5115 5084 31 06
िजमोिि घजटी ननगम DVC 3035 3035 0 00 3035 3035 0 00
झजिखणड Jharkhand 1210 1210 0 00 1339 1291 48 36
ओडडशज Odisha 4827 4827 0 00 5357 5357 0 00
पशशचम बगजल West Bengal 8287 8287 0 00 9130 9123 7 01
मसशककम Sikkim 100 100 0 00 106 106 0 00
अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7
परवी कषतर Eastern Region 21658 21658 0 00 23141 22733 408 18
अरणजचल परिश Arunachal Pradesh 133 131 2 15 138 138 0 01
असम Assam 1539 1508 31 20 1865 1809 56 30
मणणपि Manipur 204 199 5 25 219 216 3 12
मघजलय Meghalaya 357 357 0 00 374 372 1 04
ममज़ोिम Mizoram 108 105 3 28 121 119 2 17
नजगजलड Nagaland 127 125 2 16 156 138 18 116
बिपिज Tripura 249 249 0 00 298 293 5 17
उततर-परवी कषतर North-Eastern Region 2540 2535 5 02 2967 2850 117 39
समपणण भारत All India 169464 168745 719 04 177022 175528 1494 08
Note The revised data for March 2019 is not avaliable 26
अधिकतम वरवदयत आपरत ण शथिरत ररपोरण (परवाणरवलोकन) Peak Power Supply Position Report (Provisional)
आकड़ मगज वजट नट Figures in MW net
राजयStateमािण2019 March2019 अपरल2018 -मािण2019 April2018 to March2019
मजग की पनत ा म कमी मजग की पनत ा म कमी Demand not MetDemand not Met
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
Excludes the supply to Bangladesh
अपरल 2019 April2019 अपरल2018 -मािण2019 April2019 to April2019
उततरी कषतर Northern Region
चडीगढ़ Chandigarh(Data Not Received)दिलली Delhi
हरियजणज Haryana
दहमजचल परिश Himachal Pradeshरमम कशमीि Jammu amp Kashmir(Data
Not Received)परजब Punjab
िजरसथजन Rajasthanउतति परिश Uttar Pradesh
उततिजखड Uttarakhand
पशचिमी कषतर Western Region
छततीसगढ़ Chhattisgarh
Apr-Nov 2018- No cuts
Maximum Demand cut-58MW
Energy cut- 00020-00032 MUsday
गरिजत Gujarat
मधय परिश Madhya Pradesh
महजिजषटर Maharashtra
गोवज Goa
दकषकषणी कषतर Southern Region
आनधर परिश Andhra Pradesh
तलगजनज Telangana
कनजाटक Karnataka
किल Kerala
तममल नजड Tamil Nadu
पडचिी Puducherryपरवी कषतर Eastern Region
बबहजि Bihar
झजिखणड Jharkhand
ओडडशज Odisha
पशशचम बगजल West Bengal
No N
otifie
d Cu
ts
27
मािण 2019 म इडथरीर पर वरवदयत करौती का वरवरवरण Notified Power CutsRestrictions on Industries during April2019
राजय कषतर State Regionऊराणमाग करौती EnergyDemand Cut
No N
otifie
d Cu
tsNo
Notifie
d Cu
ts
अपरल2019 April 2019 अपरल2019 -अपरल2019 April2019 to April2019
उततरी कषतर Northern Region
चडीगढ़ Chandigarh Data not received Data not received
दिलली Delhi Data not received Data not received
हरियजणज Haryana 0811 hrsday 0811 hrsday
दहमजचल परिश Himachal Pradesh HPSEBL has only 2 agriculture consumers and uninterrupted
power is being supplied to agriculture sector
HPSEBL has only 2 agriculture consumers and uninterrupted
power is being supplied to agriculture sector
रमम कशमीि Jammu amp Kashmir Data not received Data not received
परजब Punjab 379 hrsday 379 hrsday
िजरसथजन Rajasthan 0630 hrsday 0630 hrsday
उतति परिश Uttar Pradesh 2157 hrsday 2157 hrsday
उततिजखड Uttarakhand 2359 hrsday 2359 hrsday
पशचिमी कषतर Western Region
छततीसगढ़ Chhattisgarh 18 hrsday 18 hrsday
गरिजत Gujarat 8 hrsday 8 hrsday
मधय परिश Madhya Pradesh Three-Phase Supply(Irrigation)- 0953 hrs day Three-Phase
(Mixed) Supply - 2334 hrs day
Three-Phase Supply(Irrigation)- 0953 hrs day Three-Phase
(Mixed) Supply - 2334 hrs day
महजिजषटर Maharashtra Three-Phase Supply(Irrigation)- 9 hrs day Three-Phase Supply(Irrigation)- 9 hrs day
गोवज Goa No restriction No restriction
दकषकषणी कषतर Southern Region
आनधर परिश Andhra Pradesh 07 hrsday 07 hrsday
तलगजनज Telangana 24 hrsday 24 hrsday
कनजाटक Karnataka 6 hrsday 6 hrsday
किल Kerala No Restrictions No Restrictions
तममल नजड Tamil Nadu 9 hrsday (6 hrs during day time and 3 hrs during night time) 9 hrsday (6 hrs during day time and 3 hrs during night time)
पडचिी Puducherry No Restrictions No Restrictions
परवी कषतर Eastern Region
बबहजि Bihar 18 hrsday 18 hrsday
झजिखणड Jharkhand 20 hrsday 20 hrsday
ओडडशज Odisha 24 hrsday 24 hrsday
पशशचम बगजल West Bengal 23 hrsday 23 hrsday
28
मारच 2019 कषि कषतर को षिदयत आपरतच का षििरण Power Supply to Agricultural Sector during March2019
राजय कषतर State Regionऔसत वरवदयत आपरत ण घनरो म Average Hours of Supply
On segregated feeders
SNo Contents Page
1 Growth of Installed Capacity since 6th Plan 29
2 Progress of Transmission Sector since 6th Plan 30
3 All India Yearly Coal consumption for Power Generation (Utilities)
4 All India Annual Per Capita Consumption of Electricity since -2006
5 Average cost of power supply amp Average realisation (Paisakwh)
6 Growth of Rural Electrification amp Pump Sets Energisation
7 Status of Hydro Schemes Cleared by the CEA in Apr-2019
Section G - Growth of Power Sector
31
32
(In MW)
Coal Gas Diesel Total
End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472
End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634
End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537
End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596
End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921
End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703
End of 12th Plan 19216288 2532938 83763 21832988 6780 4447842 50018 31960630
Up to Apr-2019 20070450 2493722 63763 22627934 678000 4539922 7764163 35610019
Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-17) = 51529 MW
Electricity Generation (MU) Targets and Achievements for 2016-17
Coal Gas Diesel Nuclear Hydro Res Total
2007045 2493722 637629 678000 453992 77641625 22925174
29
1 Growth of Installed Capacity Since 6th Plan
Plan YearThermal
Nuclear Hydro RES (MNRE) Total
2007045
2493722637629
678000
4539922
77641625
Total Installed Capacity 35610019 MW
Coal Gas Diesel Nuclear Hydro Res
Progress of Transmission Sector in the Country up to April 2019
1 TRANSMISSION LINES (All fig in CKM)
At the end of
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
6th plan 0 0 0 0 0 0 0 0 0 0 0 0 1831 4198 0 6029 1641 44364 0 46005 3472 48562 0 52034
7th plan 0 0 0 0 0 0 0 0 0 0 0 0 13068 6756 0 19824 4560 55071 0 59631 17628 61827 0 79455
8th plan 0 0 0 0 1634 0 0 1634 0 0 0 0 23001 13141 0 36142 6564 73036 0 79600 31199 86177 0 117376
9th plan 0 0 0 0 3234 1504 0 4738 751 409 0 1160 29345 20033 0 49378 8687 88306 0 96993 42017 110252 0 152269
10th plan 0 0 0 0 4368 1504 0 5872 1775 409 0 2184 48708 24730 0 73438 9444 105185 0 114629 64295 131828 0 196123
11th Plan 0 0 0 0 5948 1504 1980 9432 4839 411 0 5250 71023 30191 5605 106819 10140 125010 830 135980 91950 157116 8415 257481
12th Plan 6124 0 0 6124 5948 1504 1980 9432 25465 1177 4598 31240 92482 48240 17065 157787 11014 151276 978 163268 141033 202197 24621 367851
13th Plan (Up
to Mar2019)6124 0 0 6124 5948 1504 1980 9432 33692 1512 6605 41809 101335 58238 21173 180746 11734 162552 1010 175296 158833 223806 30768 413407
13th Plan (Up
to Apr-19)6124 0 0 6124 5948 1504 1980 9432 33745 1512 6605 41862 101335 58258 21173 180766 11734 162953 1010 175697 158886 224227 30768 413881
27150 600 MW of 132 kV Inter-Regional power transmission capacity links which are operated radially from time to time is not added in the total
75050
47900
24000
99050
30
Grand Total
Note - The figure upto the end of 10th plan in for stringing progress including the lines not commissioned Now only commissioned lines are reckoned Accordingly the figure for 10th plan (end) may read
as 187555 after adjusting with (-) 10852 Ckm
Inter-regional Power Transfer Capacity (MW)
plusmn 800 kV HVDC plusmn 500 kV HVDC 765 kV 400 kV 220 kV
IR addition in 12th
Plan (up to March
2017)
Inter-regional
Transmission
Capacity at the end
of Plan Period 2017-
22 (as on April19)
IR at the end of 11th
PlanIR at the end of 12th
Plan
IR Capacity Addition
at the end of Plan
Period 2017-22 (Till
April 19)
2004-05 27800
2005-06 28100
2006-07 30200
2007-08 33000
2008-09 35500
2009-10 36700
2010-11 38700
2011-12 41756
2012-13 45460
2013-14 48940
2014-15 53040
2015-16 54590
2016-17 57430
2017-18 60800
2018-19 62890
Year
2005-06
2006-07
2007-08
2008-09
2009-10
2010-11
2011-12
2012-13
2013-14
2014-15
2015-16
2016-17
2017-18
2018-19
2004-05 254 209 7568
2005-06 260 221 7636
2006-07 276 227 7423
2007-08 293 239 7727
2008-09 340 263 8713
2009-10 355 268 8870
2010-11 398 303 11975
2011-12 455 330 13514
2012-13 501 376 14867
2013-14 518 175
2014-15 520
Source- PFC Reports on the performance of State Power Utilities 31
1181
7335
7786
91441
8188
88363
957
1010
1075
1122
1149
(GrossGen+ Net Import) Mid-year population Provisional
5 Average cost of power supply amp average realization ( paiseKWH )
Yearcost of supply
(paiseunit)
Realization(paiseunit)
Including AgricultureOnly
Agriculture
6719
7171
3 All India yearly Coal Consumption for Power Generation (Utilities)
YEARCoal Consumption
Million Tonnes
4 All India Annual per Capita consumption of Electricity Since 2006
Per Capita Consumption ( kWh)
6314
Sl
NoExecuting Agency
Installed
Capacity (MW)Cost (Rs crore)
Date of
Clearance
32
Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as
Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received
from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made
available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified
villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is
independent of the earlier published reports
No Hydro Electric Project has been issued concurrenceAppraisal letter by CEA during April 2019
7 Status of Hydro Schemes Cleared by the CEA in Apr-2019
Name of Scheme
1999-002000-01
297594
010408 to 310309010409 to 310310
10th Plan
2005-062006-07
322968331020
6 Growth Of Rural Electrification amp Pumpsets Energisation
Plan Year
9th Plan2002-03
134092626
4111
Pump Sets Energised Villages Electricfied (Nos)
2001-02
284064367244
1218
27801997-981998-99
3207
482864
12632
1576036
4451722594
15455554
2314176
397343611750
2093311060316074
65109527813884
46708
18423975
499150
2003-042004-05
5743
9769
Cumu upto End of 10th Plan
010407 to 310308
010410 to 310311557976840909
010411 to 310312
412667
86293726
No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification
since 2004-05
65291374575 296361511th Plan
Cumu upto End of 11th Plan
596556 21212860
557439Cummulative up to end of 12th Plan
SN Contents Page
1 Rate of sale of power for the year 2016-17 33-41
RATE OF SALE OF POWER FOR THE YEAR 2016-17
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) NORTHERN REGION
CENTRAL SECTOR
BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 18000 66900 19800
CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 54000 222400 21600
CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 30000 144400 19600
CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 23100 91700 42600
PARBATI - III HPS NHPC LTD HYDRO-HYDRO 52000 68200 54800
DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 28000 95600 30000
CHUTAK NHPC LTD HYDRO-HYDRO 4400 22000 79800
DULHASTI HPS NHPC LTD HYDRO-HYDRO 39000 228000 56400
SALAL HPS NHPC LTD HYDRO-HYDRO 69000 342300 11000
TANAKPUR HPS NHPC LTD HYDRO-HYDRO 9420 43000 29600
URI HPS -I NHPC LTD HYDRO-HYDRO 48000 280300 16000
URI HPS - II NHPC LTD HYDRO-HYDRO 24000 147300 48600
NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 4500 24600 88200
SEWA - II NHPC LTD HYDRO-HYDRO 12000 47100 43400
ANTA CCPP NTPC LTD THERMAL-GASN 41930 67539 32400
AURAIYA CCPP NTPC LTD THERMAL-GASN 66336 53501 39100
BADARPUR TPS NTPC LTD THERMAL-COAL 70500 159153 44800
DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 84000 296170 42300
DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 98000 526686 46300
DADRI CCPP NTPC LTD THERMAL-GASHSD 82978 227469 33000
FARIDABAD CCPP NTPC LTD THERMAL-GASN 43159 115577 30800
RIHAND STPS I NTPC LTD THERMAL-COAL 100000 596766 24500
RIHAND STPS II NTPC LTD THERMAL-COAL 100000 737069 24600
RIHAND STPS III NTPC LTD THERMAL-COAL 100000 706546 30600
SINGRAULI STPS NTPC LTD THERMAL-COAL 200000 1394068 20400
TANDA TPS NTPC LTD THERMAL-COAL 44000 295438 40800
UNCHAHAR TPS I NTPC LTD THERMAL-COAL 42000 256454 39800
UNCHAHAR TPS II NTPC LTD THERMAL-COAL 42000 273577 38900
UNCHAHAR TPS III NTPC LTD THERMAL-COAL 21000 142780 43000
KOLDAM NTPC LTD HYDRO-HYDRO 80000 363260 43600
NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 303575 25841
RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 108000 668677 35374
NJHPS SJVNL HYDRO-HYDRO 150000 699496 23820
RAMPUR HPS SJVNL HYDRO-HYDRO 41202 195982 32260
TEHRI HPP THDC HYDRO-HYDRO 100000 272543 51800
KOTESHWAR HEP THDC HYDRO-HYDRO 40000 106244 53400
IGSTPS JHAJJAR ARAVALI P CPL THERMAL-COAL 150000 510429 49490
NEYVELI BARSINGSAR NEYVELI LIG CORP LTD THERMAL-LIG 25000 127520 38040
STATE SECTOR
PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 21000 14222 48200
PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 21000 19205 48400
PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 25000 102257 42600
PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 25000 62107 41800
DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 60000 312213 41000
RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 120000 35767442200
WYC HYDEL STATION HPGCL HYDRO-HYDRO 6240 20365 24900
GIRI POWER HOUSE HPSEB HYDRO-HYDRO 6000 13958 7600
ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 1695 5467 11900
BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 12000 18528 6700
GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 2250 7462 22500
BASSI POWER HOUSE HPSEB HYDRO-HYDRO 6600 29649 7500
BINWA POWER HOUSE HPSEB HYDRO-HYDRO 600 2749 19300
ANNEXURE-I
RATE OF SALE OF POWER FOR THE YEAR 2016-2017
Page 33
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) GAJ POWER HOUSE HPSEB HYDRO-HYDRO 1050 2914 26700
BANER POWER HOUSE HPSEB HYDRO-HYDRO 1200 2864 16200
HOLI POWER HOUSE HPSEB HYDRO-HYDRO 300 616 22500
THIROT POWER HOUSE HPSEB HYDRO-HYDRO 450 1126 22500
KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 1200 3064 22500
LARJI POWER HOUSE HPSEB HYDRO-HYDRO 12600 53677 23700
NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 250 750 31000
CHABA POWER HOUSE HPSEB HYDRO-HYDRO 175 465 23300
RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 150 101 13400
SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 200 000 22500
KILLAR HPSEB HYDRO-HYDRO 030 050 22500
BHABA AUGUMENP H HPSEB HYDRO-HYDRO 450 1276 22500
BS CHAMBA HPSEB HYDRO-HYDRO 045 099 19500
GUMMA HPSEB HYDRO-HYDRO 300 423 22500
GAS TURBINE POWER STATION IPGCL THERMAL-GAS 27000 67233 39300
PPS-I PPCL THERMAL-GAS 33000 175905 38300
PPS-III PPCL THERMAL-GAS 137120 196879 36100
LOWER JHELUM JampKPDD HYDRO-HYDRO 10500 60214 5100
UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 2260 10514 6300
UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 10500 44202 8500
GANDHARBAL JampKPDD HYDRO-HYDRO 1500 8925 4700
KARNAH MPH JampKPDD HYDRO-HYDRO 200 1122 31000
CHENANI I JampKPDD HYDRO-HYDRO 2330 10892 6600
CHENANI II JampKPDD HYDRO-HYDRO 200 1188 9300
CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 750 3634 14200
IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 375 2108 18500
IGO MERCHELLONG JampKPDD HYDRO-HYDRO 300 1572 29700
PAHALGAM MHP JampKPDD HYDRO-HYDRO 450 1713 32900
MARPACHOO JampKPDD HYDRO-HYDRO 075 375 29800
HAFTAL JampKPDD HYDRO-HYDRO 100 483 28700
SANJAK JampKPDD HYDRO-HYDRO 126 441 36000
SEWA-III JampKPDD HYDRO-HYDRO 900 3273 20200
BHADERWAH JampKPDD HYDRO-HYDRO 150 935 8900
BAZGO JampKPDD HYDRO-HYDRO 030 108 33300
SUMOOR JampKPDD HYDRO-HYDRO 010 045 35400
HUNDER JampKPDD HYDRO-HYDRO 040 176 26200
STAKNA JampKPDD HYDRO-HYDRO 400 1933 4100
KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 124000 662879 31360
SURATGARH TPS RRVUNL THERMAL-COAL 150000 402328 41730
CHHABRA TPS 1amp 2 RRVUNL THERMAL-COAL 50000 305946 36700
CHHABRA TPS 3 RRVUNL THERMAL-COAL 25000 151536 36700
CHHABRA TPS 4 RRVUNL THERMAL-COAL 25000 155896 36700
RAMGARH GT POWER PROJECT RRVUNL THERMAL-COAL 22050 43177 41800
RAMGARH GAS T P PROJECT 3 RRVUNL THERMAL-GAS 5000 93615 41800
DHOLPUR C C POWER PROJECT RRVUNL THERMAL-R-LNG 33000 9486 46110
MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 14000 20855 34192
MINI MICRO HYDEL (MMH) P S RRVUNL HYDRO-HYDRO 2385 851 37800
KALISINDH TPP 1 RRVUNL THERMAL-COAL 60000 341543 45000
KALISINDH TPP 2 RRVUNL THERMAL-COAL 60000 211588 45000
KHARA HEP UPJVNL HYDRO-HYDRO 7200 26654 7200
MATATILLA HEP UPJVNL HYDRO-HYDRO 3060 12219 6500
OBRA HEP UPJVNL HYDRO-HYDRO 9900 21517 6300
RIHAND UPJVNL HYDRO-HYDRO 30000 57369 5500
ANPARA A TPS UPRVUNL THERMAL-COAL 63000 317536 27000
ANPARA B TPS UPRVUNL THERMAL-COAL 100000 705605 22700
ANPARA D UPRVUNL THERMAL-COAL 100000 300158 39800
HARDUAGANJ TPS UPRVUNL THERMAL-COAL 16500 45817 49200
HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 50000 304389 46600
OBRA A TPS UPRVUNL THERMAL-COAL 28800 13158 34000
OBRA B TPS UPRVUNL THERMAL-COAL 100000 328124 21900
Page 34
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) PANKI TPS UPRVUNL THERMAL-COAL 21000 66488 50300
PARICHHA TPS UPRVUNL THERMAL-COAL 22000 38762 49400
PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 42000 231931 45600
PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 50000 276722 50400
CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 24000 70845 8290
CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 14400 75366 8390
DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 3375 9595 12080
DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 5100 18701 10520
KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4140 17359 12330
KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 12000 33001 9420
KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 3000 11953 8320
TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 9000 33983 12460
MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 30400 124510 16110
RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 19800 17897 10550
MPUR UTTARAKHAND JVNL HYDRO-HYDRO 930 5121 19200
PATHRI UTTARAKHAND JVNL HYDRO-HYDRO 2040 11636 14200
GALOGI UTTARAKHAND JVNL HYDRO-HYDRO 300 648 12500
PRIVATE SECTOR
MGTPP CLP INDIA PVT LTD THERMAL-COAL 132000 268902 41940
SHRINAGAR HEP ALAKNANDA HPCL HYDRO-HYDRO 33000 127414 48800
GAMA INFRAPROP CCPP GAMA INFRAPROP PVT THERMAL-GAS 22500 52686 47000
PPGCL (BARA) JP POWER VENTURES LTD THERMAL-COAL 198000 448200 38500
MALANA HEP MALANA PCL HYDRO-HYDRO 8600 26354 29792
MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 10000 30369 32580
ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 19200 56347 36079
KASHANG HEP H P PCL HYDRO-HYDRO 19500 5034 29200
BASPA-II HEP HBPCL HYDRO-HYDRO 30000 132769 13600
KARCHAM WANGTOO HEP HBPCL HYDRO-HYDRO 100000 434386 36600
RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 108000 582600 43700
RITHALA COMBI CY POWER PLANT TATA POWER DDL THERMAL-GAS 9480 000 11900
RAJPURA TPS NABHA POWER LTD THERMAL-GAS 140000 901484 39000
TALWANDI SABO POWER LTD TALWANDI SABO POWER LTD THERMAL-COAL 198000 636040 49548
ROJA THERMAL POWER STATION ROJA POWER SCL THERMAL-COAL 120000 727200 43400
KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 34400 63400
BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 36000 62600
MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 38200 60800
UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 37900 61500
KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 42300 58800
LALITPUR PGCL BAJAJ ENERGY PVT LTD THERMAL-COAL 198000 359400 47300
PRAYAGRAJ PGCL PRAYAGRAJ PGCL THERMAL-COAL 132000 448200 38595
KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 132000 783182 33438
WESTERN REGION
CENTRAL SECTOR
INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 100000 325333 23892
OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 52000 141663 34001
GANDHAR CCPP NTPC LTD THERMAL-GAS 65739 221924 28700
KAWAS CCPP NTPC LTD THERMAL-GASN 65620 167929 27000
KORBA I amp II NTPC LTD THERMAL-COAL 210000 1499171 20500
KORBA III NTPC LTD THERMAL-COAL 50000 358746 26600
SIPAT STPS I NTPC LTD THERMAL-COAL 198000 1479902 26800
SIPAT STPS II NTPC LTD THERMAL-COAL 100000 766549 26500
VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 126000 693142 25800
VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 100000 608781 23800
VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 100000 673475 27600
VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 100000 655924 32900
VINDHYACHAL STPS V NTPC LTD THERMAL-COAL 50000 328265 31700
MOUDA I NTPC LTD THERMAL-COAL 100000 343130 44500
MOUDA Ii NTPC LTD THERMAL-COAL 66000 40637 39900
RATNAGIRI GAS amp POWER PVT LTD RGPPL THERMAL-GAS 196708 442485 47000
KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 000 24729
TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 32000 201227 10740
Page 35
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 365122 19069
TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 787444 29324
STATE SECTOR
GSEG-HAZIRA15610 MW GUJARAT S ENEGEN LTD THERMAL-GAS 15610 1805 28200
GSEG-HAZIRA35143 MW GUJARAT S ENEGEN LTD THERMAL-GAS 35130 22276 51300
GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 21978 51800
AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 13929 26100
KORBA TPS EAST CSPGCL THERMAL-COAL 44000 198673 33880
DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 365808 27570
KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 316500 30420
HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 532878 19410
CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 515 58300
MTTPS CHAMPA U-I CSPGCL THERMAL-COAL 50000 220376 39000
MTTPS CHAMPA U-II CSPGCL THERMAL-COAL 50000 23709 10000
SHP GANGREL CSPGCL HYDRO-HYDRO 1000 2350 36790
BANGO HEP CSPGCL HYDRO-HYDRO 12000 14662 8900
MHP KORBA WEST CSPGCL HYDRO-HYDRO 170 859 38190
SIKASAR HEP CSPGCL HYDRO-HYDRO 700 418 26870
DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8843 74500
DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 19446 51500
GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 66388 71600
GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127488 41300
KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 96072 43900
KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 29841 56400
SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 184966 58800
UKAI 1-5 GSECL THERMAL-COAL 85000 204891 46900
UKAI TPS 6 GSECL THERMAL-COAL 50000 284448 48200
WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 271999 58300
WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 82808 44100
KADANA HPS GSECL HYDRO-HYDRO 24200 34433 16800
UKAI HPS GSECL HYDRO-HYDRO 30500 40585 6100
TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 123000 11500
BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 8900 10900
BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 7200 27500
JHINNA HPS MPPGCL HYDRO-HYDRO 2000 9700 18500
RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 44300 3400
GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 17300 4600
SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 4100 16900
MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 14600 27000
PENCH HPS MPPGCL HYDRO-HYDRO 16000 23700 8100
RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 3000 16900
AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 134400 35100
SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 283800 38700
SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 344600 34300
SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 111600 61600
SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 211800 58000
SSTPS PH-I MPPGCL THERMAL-COAL 120000 233100 84300
BHUSAWAL TPS MSPGCL THERMAL-COAL 142000 566258 51100
CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1365682 33700
KHAPERKHEDA MSPGCL THERMAL-COAL 134000 706207 39100
KORADI TPS MSPGCL THERMAL-COAL 62000 443206 42000
NASIK TPS MSPGCL THERMAL-COAL 63000 297275 47000
PARLI TPS MSPGCL THERMAL-COAL 113000 175934 71600
PARAS MSPGCL THERMAL-COAL 50000 267931 38700
URAN CCPP MSPGCL THERMAL-GAS 67200 320330 30600
KOYANA MSPGCL HYDRO-HYDRO 195600 328155 13100
SMALL HYDRO POWER PLANTS MSPGCL HYDRO-HYDRO 45400 93062 30500
BHIRA MSPGCL HYDRO-HYDRO 8000 10046 8400
TILLARI MSPGCL HYDRO-HYDRO 8900 10584 3100
SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 233298 20500
SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 87633 20500
PRIVATE SECTOR
Page 36
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 81282 46750
JNSTPP(JAYPEE NIGRIE) JP POWER VENTURES LTD THERMAL-COAL 132000 726695 29310
MB POWER MB POWER THERMAL-COAL 120000 345632 38310
ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 754922 28671
ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 780761 23495
ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 198000 1263784 32090
ADANI POWER MAHARA ADANI POWER LTD THERMAL-COAL 330000 1666191 34124
AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 170065 36827
SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 252035 45129
ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 458551 36000
ESSAR POWER MP LTD ESSAR POWER MP LTD THERMAL-COAL 60000 243040 28600
VEDANTA LTD (P P -I) VEDANTA LTD THERMAL-GAS 3000 15044 24000
VEDANTA LTD (P P -II) VEDANTA LTD THERMAL-GAS 3000 21293 24000
PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 8234600 24000
165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 5850 64390
145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 68717 40349
SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 132655 28776
SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 144686 38567
MUNDRA UMPPCOASTAL GUJARAT POWER
LTD THERMAL-IMP COAL 400000 2530300
23900
LANCO AMARKANTAK TPP PATHADIH
U-ILANCO AMARKAN POWER LTD THERMAL-COAL 30000 195500
29200
LANCO AMARKANTAK TPP PATHADIH
U-IILANCO AMARKAN POWER LTD THERMAL-COAL 30000 206900
27600
BARADARHA TPS D B POWER LTD THERMAL-COAL 120000 677373 29200
JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 405000 28900
JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 453000 40500
DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 339437 40700
TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 293400 44000
TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 137200 37000
TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 174900 44000
BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 92900 14100
BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23700 34300
KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 27600 48300
CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2530300 23900
BHANDARDRA HEP -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 2475 54900
SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 161400 26500
SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 445000 39000
SOTHERN REGION
CENTRAL SECTOR
NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 325699 54820
NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 305532 39880
NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 998805 38510
NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 113016 54070
NEYVELI TAMILNADU POWER LTD JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 625274 42200
VALLUR TPS NTPC TECL THERMAL-COAL 150000 856438 42350
R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 1493 84300
RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1502919 29400
RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 341291 31800
SIMHADRI I NTPC LTD THERMAL-COAL 100000 688382 36800
SIMHADRI II NTPC LTD THERMAL-COAL 100000 663657 43400
KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 593110 31324
MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 291625 21764
KKNPP-1 amp 2 NPCIL NUCLEAR-NUCLEAR 200000 572609 40948
MINICOY LAKSHADEEP THERMAL-DIESEL 340 770 29600
KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1097 29600
AMINI LAKSHADEEP THERMAL-DIESEL 265 509 29600
ANDROTT LAKSHADEEP THERMAL-DIESEL 219 524 29600
KALPENI LAKSHADEEP THERMAL-DIESEL 175 356 29600
AGATTI LAKSHADEEP THERMAL-DIESEL 195 658 29600
KADMAT LAKSHADEEP THERMAL-DIESEL 190 414 29600
KILTAN LAKSHADEEP THERMAL-DIESEL 150 269 29600
CHETLET LAKSHADEEP THERMAL-DIESEL 100 139 29600
BITRA LAKSHADEEP THERMAL-DIESEL 043 024 29600
BANGARAM LAKSHADEEP THERMAL-DIESEL 018 009 29600
Page 37
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) STATE SECTOR
Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 721811 46500
Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 50000 336142 46500
RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 237358 46500
RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 239926 46500
RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 124500 46500
SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 62109 46500
UPPER SILERU APGENCO HYDRO-HYDRO 24000 33000 46500
LOWER SILERU APGENCO HYDRO-HYDRO 46000 81066 46500
DONKARAI APGENCO HYDRO-HYDRO 2500 6007 46500
PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 1262 46500
CHETTIPETA APGENCO HYDRO-HYDRO 100 214 46500
MUCHKUND APGENCO HYDRO-HYDRO 12000 37571 46500
NAGARJUNASAGAR RCPH APGENCO HYDRO-HYDRO 9000 606 46500
TUNGABHADRA HES amp HAMPI(AP
Share)
APGENCO HYDRO-HYDRO 7200 6100 46500
KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 352232 42600
KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 288131 32500
KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 319272 46500
RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 40073 44300
KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 308317 46000
KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 308963 51300
SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 61004 76600
NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 17960 75300
PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 20873 58300
POCHAMPAD-I TSPGENCO HYDRO-HYDRO 2700 5455 29800
POCHAMPAD-II TSPGENCO HYDRO-HYDRO 900 1932 40700
NIZAMSAGAR TSPGENCO HYDRO-HYDRO 1000 1126 53400
RAICHUR TPS 1 to 7 KPCL THERMAL-COAL 147000 890866 43800
RAICHUR TPS 8 KPCL THERMAL-COAL 25000 159523 48200
BELLARI TPS 1 KPCL THERMAL-COAL 50000 318679 51100
BELLARI TPS 2 KPCL THERMAL-COAL 50000 232347 55600
BELLARI TPS 3 KPCL THERMAL-COAL 70000 47565 34400
BHADRA PH KPCL HYDRO-HYDRO 3920 2369 45900
GERUSUPPA PH KPCL HYDRO-HYDRO 24000 26990 22000
GHAT PRABHA HEP KPCL HYDRO-HYDRO 3200 4777 25300
KADRA HPS KPCL HYDRO-HYDRO 15000 16889 26800
NAGJHARI KPCL HYDRO-HYDRO 90000 155159 9800
KODASALLI DPH KPCL HYDRO-HYDRO 12000 14854 19200
MUNIRA+MGH+SPH+SPH KPCL HYDRO-HYDRO 22640 48211 7900
SHARAVATHY HPS KPCL HYDRO-HYDRO 108550 276215 5400
ALMATTI DPH KPCL HYDRO-HYDRO 29000 39611 24600
VARAHI UGPH KPCL HYDRO-HYDRO 46000 71368 15600
IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 17196 15300
IDUKKI HPS KSEB HYDRO-HYDRO 78000 137905 15300
KAKKAD HPS KSEB HYDRO-HYDRO 5000 13063 15300
KALLADA HPS KSEB HYDRO-HYDRO 1500 4436 15300
KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 46544 15300
KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 635 15300
LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 30822 15300
MALANKARA HPS KSEB HYDRO-HYDRO 1050 2474 15300
MATTUPETTY KSEB HYDRO-HYDRO 200 230 15300
MALAMPUZHA KSEB HYDRO-HYDRO 250 063 15300
CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 864 15300
URUMI ST I amp II KSEB HYDRO-HYDRO 615 903 15300
LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 248 15300
NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7765 19625 15300
PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 16601 15300
PANNIAR HPS KSEB HYDRO-HYDRO 3240 6217 15300
PORINGALKUTHU KSEB HYDRO-HYDRO 3600 10052 15300
PORINGALKUTHU LBE KSEB HYDRO-HYDRO 1600 9438 15300
PEPPARA KSEB HYDRO-HYDRO 300 395 15300
POOZHITHODE KSEB HYDRO-HYDRO 480 1045 15300
Page 38
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) PEECHI KSEB HYDRO-HYDRO 125 040 15300
RANI-PERUNADU KSEB HYDRO-HYDRO 400 585 15300
SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 79783 15300
SENGULAM HPS KSEB HYDRO-HYDRO 5120 11558 15300
SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 16711 15300
VILANGAD KSEB HYDRO-HYDRO 750 1578 15300
BARAPOLE KSEB HYDRO-HYDRO 1500 1932 15300
VELLATHOOVAL KSEB HYDRO-HYDRO 360 305 15300
CHIM0NY KSEB HYDRO-HYDRO 250 156 15300
ADYANPARA KSEB HYDRO-HYDRO 350 501 15300
BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 554 15300
KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 3801 15300
KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 23132 32800
ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 14416 62280
METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 523970 62280
METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 321270 62280
NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 336575 62280
NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 591240 62280
TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 508966 62280
KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 30897 62280
VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 18720 90699 62280
KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 33593 62280
BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 1047 62280
PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 1250 62280
PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 330 62280
MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 4897 62280
MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 032 62280
KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15681 62280
KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 40608 62280
KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 21342 62280
KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 4717 62280
KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4322 62280
KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2399 62280
METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 4416 62280
METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 8035 62280
BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2187 62280
BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2359 62280
BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2511 62280
BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 1949 62280
BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 1819 62280
POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 172 62280
SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 241 62280
MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 026 62280
THIRUMOORTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 136 62280
PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 9309 62280
VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 353 62280
SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 4192 62280
PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 6571 62280
SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 1186 62280
SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6319 62280
ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 6122 62280
KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 28674 62280
SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 18381 62280
SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 4258 62280
KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 12680 62280
KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4201 62280
ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 000 62280
PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 19175 62280
AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 078 62280
BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 504 62280
BHAVANI KATTALAI (BKB)(IIIampIII BB I amp II)TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 5847 62280
PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 000 62280
Page 39
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) SRI DAMODARAM STPS APPDCL THERMAL-COAL 160000 808108 36300
PRIVATE SECTOR
KARUPPUR TANJORE LANCO TANJORE PCL THERMAL-GAS 12000 48096 28770
SIMHAPURI ENERGY LTD SIMHAPURI ENERGY LTD THERMAL-COAL 60000 143900 39100
JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 7111 45500
SBU 1 JSW ENERGY LTD
VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 26000 159100
43300
SBU 2 JSW ENERGY LTD
VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 60000 247900
42800
LANCO KPLLANCO KONDAPALLI POWER
LTDTHERMAL-GAS 36814 85060
25776
LANCO KPL STG -IILANCO KONDAPALLI POWER
LTDTHERMAL-GAS 36600 12979
46330
LANCO KPL STG -IIIALANCO KONDAPALLI POWER
LTDTHERMAL-GAS 37100 85710
46330
LANCO KPL STG -III BLANCO KONDAPALLI POWER
LTDTHERMAL-GAS 37100 43639
46330
HINDUJA NATIONAL PCL HINDUJA NATIONAL PCL THERMAL-COAL 104000 303000 38200
MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 121164 49940
UDUPI POWER COR LTD ADANI POWER LTD THERMAL-COAL 120000 754613 42500
SPECTRUM POWER GENERATION
LTD SPECTRUM PG LTD THERMAL-GASN 20525 9256812
34952
TAQA NEYVELI POWER COM PVT
LTD TAQA NEYVELI THERMAL-LIG 25000 5840
34500
ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 251000 51000
ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 207860 36800
GMR VEMAGIRI POWER GENERATION
LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 30117
46450
EASTERN REGION
CENTRAL SECTOR
MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 64675 53113
MTPS STAGE - II KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 39000 1432 69138
BOKARO `B` TPS DVC THERMAL-COAL 63000 145670 31539
MEJIA TPS U 1-3 DVC THERMAL-COAL 63000 348298 31552
MEJIA TPS U 4 DVC THERMAL-COAL 21000 116099 34997
MEJIA TPS U 5-6 DVC THERMAL-COAL 50000 276427 35976
MEJIA TPS U 7-8 DVC THERMAL-COAL 100000 552854 36991
DURGAPUR STEEL TPS DVC THERMAL-COAL 100000 665550 39323
DURGAPUR TPS DVC THERMAL-COAL 21000 59270 35416
RAGHUNATHPUR TPS DVC THERMAL-COAL 120000 201650 35326
MAITHON HYDEL STA DVC HYDRO-HYDRO 6320 12200 17984
CHANDRAPURA TPSU1-3 DVC THERMAL-COAL 42000 257610 35095
CHANDRAPURA TPSU7-8 DVC THERMAL-COAL 50000 306673 34987
KODERMA TPS DVC THERMAL-COAL 100000 380180 38131
PANCHET HPS DVC HYDRO-HYDRO 8000 13360 17984
TILLAYA HPS DVC HYDRO-HYDRO 400 1410 17984
RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34700 35400
TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 277300 23200
TLDP -III NHPC LTD HYDRO-HYDRO 13200 55400 62000
TLDP -IV NHPC LTD HYDRO-HYDRO 16000 60300 25600
FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 957219 33700
FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 308943 41000
BONGAINGAON TPS NTPC LTD THERMAL-COAL 25000 153663 58600
KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 542277 34200
KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 942591 34200
BARH-II NTPC LTD THERMAL-COAL 132000 728021 44500
TALCHER TPS NTPC LTD THERMAL-COAL 46000 335521 30100
TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 702319 25600
TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1436521 24700
STATE SECTOR
BTPS(RampM) BIHAR STATE PGCL THERMAL-COAL 22000 12142 39700
BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 98331 10602
HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 50593 9482
CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 19689 2605
RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 53192 6033
UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 147208 14637
Page 40
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 60353 4519
IB TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 288567 25000
J P H GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 210 038 61100
MEYONG CHU GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 400 1086 61100
TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 122667 38200
DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 214339 43321
KOLAGHAT THERMAL POWER
STATION
WEST BENGAL PDCL THERMAL-COAL 126000 538269 31603
BAKRESHWAR THERMAL POWER
PLANT
WEST BENGAL PDCL THERMAL-COAL 105000 634876 32154
BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 45000 166855 33299
SANTHALDIH THERMAL POWER
STATION
WEST BENGAL PDCL THERMAL-COAL 50000 336442 34932
SAGARDIGHI THERMAL POWER
PROJECT
WEST BENGAL PDCL THERMAL-COAL 160000 423121 34705
JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 20344 68900
RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 24559 68900
TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 4623 68900
PURULIA PUMPED STORAGE
PROJECT
WEST BENGAL SEDCL HYDRO-HYDRO 90000 108816 68900
MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2768 68900
PRIVATE SECTOR
CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 49474 20230
CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 555500 70200
HALDIA ENERGY HALDIA ENERGY LTD THERMAL-COAL 60000 371000 50400
DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3688 63400
KAMALANGA TPS GMR KAMALANGA ENERGY LTD THERMAL-COAL 105000547670
33300
ADHUNIK POWER U-1 ADHUNIK POWER THERMAL-COAL 27000 158 44060
ADHUNIK POWER U-2 ADHUNIK POWER THERMAL-COAL 27000 168 44250
VL-JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 332800 23622
JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 43000 45250
JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 71700 37030
JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 70700 35920
JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 71100 38870
JOJOBERA UNIT 5 TATA POWER COM LTD THERMAL-COAL 12000 79300 44560
JOJOBERA UNIT 6 TATA POWER COM LTD THERMAL-WHR 12000 83700 12840
IEL KALINGANAGAR U-I TATA POWER COM LTD THERMAL-WG 6750 33400 22500
IEL KALINGANAGAR U-II TATA POWER COM LTD THERMAL-WG 6750 34800 22500
MAITHON UNIT 1 amp 2 TATA POWER COM LTD THERMAL-COAL 105000 678000 36100
HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 27500 24340
HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 28400 24340
HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 15800 24310
NORTH EASTERN REGION
CENTRAL SECTOR
LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 74100 36600
AGARTALA GT NEEPCO THERMAL-GAS 13500 88611 27210
ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 153111 32310
DOYANG HEP NEEPCO HYDRO-HYDRO 7500 25598 49801
KOPILI HEP NEEPCO HYDRO-HYDRO 20000 98186 11491
KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 19582 20237
KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 10310 17968
RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 124093 22945
TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 10100 17344 39000
STATE SECTOR
HYDRO POWER (122 Stns) ITANAGAR GOVT OF ARUNACHAL
PRADESHHYDRO-HYDRO 6971 6217270
24600
KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39514 17337
LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 82327 36810
NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 33318 48290
MYNTRIANG SHEP ST II ASSAM POWER GENCO HYDRO-HYDRO 300 567 35776
LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 9130 49200
LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 012 49200
DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 022 49200
TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 000 49200
UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 4990 16000
UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 6476 37000
UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 16494 14600
UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 3600 9556 15000
SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 758 8000
MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44070 44800
KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 154 41400
TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 091 41400
MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 411 41400
MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 394 41400
KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 760 41400
SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 3264 41400
LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 044 41400
BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 18953 28000
ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 43585 28200
GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 4080 11100
Note
LIG Lignite N Naptha WHR Waste Heat Recovery
Page 41
Apr-2018 Apr-2019 Apr-2018 Apr-2019 Apr-2018 Apr-2019
Northern 28590 30094 28170 29786 -15 -10
Western 33235 34875 33233 34868 00 00
Southern 29211 31111 29166 31109 -02 00
Eastern 11752 12851 11650 12850 -09 00
North Eastern 1225 1300 1174 1228 -42 -55
All India 104013 110231 103393 109842 -06 -04
Apr-2018 Apr-2019 Apr-2018 Apr-2019 Apr-2018 Apr-2019
Northern 48824 54476 48367 53985 -09 -09
Western 50654 56242 50434 56222 -04 00
Southern 45946 49155 45684 49103 -06 -01
Eastern 21320 23349 21275 23349 -02 00
North Eastern 2600 2848 2552 2780 -18 -24
All India 162492 177411 161286 176810 -07 -03
Apr-2019 Figures are Provisional
7
8 Power Supply Position (Energy amp Peak) in Apr-2019
Peak Demand Peak Met
Requirement Availability
Energy (MU)Region
Surplus(+)
Deficit (-) in
Surplus(+)
Deficit (-) in Region
Power (MW)
Chandigarh Delhi Haryana HP JampK Punjab Rajasthan UP Utrakhand Apr-2018 0 0 0 0 546 0 0 247 0
Apr-2019 0 0 0 0 565 0 0 0 0
Chattisgarh Gujarat MP Maharashtra Daman amp Diu Dadar Nagar Goa
Apr-2018 13 11 3 99 0 0 0
Apr-2019 22 6 0 8 1 0 0
AP Telangana Karnataka Kerala Tamil Nadu Puducherry Lakshadweep
Apr-2018 22 0 2 0 0 20 0
Apr-2019 0 0 0 8 0 2 0
8
9 Peak Shortage of Power Supply (MW) in Different Regions in Apr-2019
0 0 0 0
565
0 0 0 00 0 0 0
546
0 0
247
0
0
400
800
Ch
an
dig
ar
h Delh
i
Ha
rya
na
HP
Jamp
K
Pu
nja
b
Ra
jasth
an
UP
Utr
akhan
d
MW
Northern States (MW) Apr-2019 Apr-2018
22
6 0 8 1 0 0
13
11
3
99
0 0 0
0
50
100
150
Ch
attis
gar
h
Guja
rat
MP
Mah
ara
shtr
a
Da
man amp
Diu
Da
dar
Na
gar G
oa
MW
Western States (MW) Apr-2019 Apr-2018
0 0 08
0 2 0
22
0 2 0 0
20
00
50
AP Telangana Karnataka Kerala Tamil Nadu Puducherry Lakshadweep
Southern State (MW) Apr-2019 Apr-2018
Bihar DVC Jharkhand Odisha West Bengal Sikkim AampN Island
Apr-2018 0 39 0 0 7 0 4
Apr-2019 0 0 0 0 0 0 4
Arunachal Assam Manipur Meghalaya Mizoram Nagaland Tripura
Apr-2018 5 30 7 0 9 29 4
Apr-2019 3 45 9 0 3 26 1
9
0 0 0 0 0 0
4
0
39
0 0
7
0
4
01020304050
Bih
ar
DV
C
Jha
rkh
an
d
Od
ish
a
We
st
Be
ng
al
Sik
kim
Aamp
NIs
land
MW
Eastern States (MW) Apr-2019 Apr-2018
3
45
9
0 3
26
1
5 7
0
9
29
4
0
10
20
30
40
50
Aru
na
cha
l
Assa
m
Ma
nip
ur
Me
gh
ala
ya
Miz
ora
m
Na
gala
nd
Trip
ura
MW
North-Eastern States (MW)
Sector Apr-2018 Apr-2019
Central 7634 7459
State 6438 6142
Private Sector IPP 5525 6005
Private Sector UTL 6815 6440
ALL INDIA 6454 6471
Month PLF 2018 PLF 2019
Jan 6215 6054
Feb 6230 6051
March 6452 6340
April 6454 6471
For Coal and Lignite based Power Plants and Provisional based on Actual-Cum-Assesment
10
PLF of Thermal Power Plants
(excluding gas based power plants)
All India PLF of Thermal Plants (Excluding Gas Based Plants) Month-wise
10 All India Thermal PLF Sector-wise (Excluding Gas Based Power Plants) for Apr-2019
5800
6000
6200
6400
6600
Jan Feb March April
Months
All India PLF Month-wise
PLF 2018 PLF 2019
7634
64385525
6815 6454
7459
6142 60056440 6471
000
2000
4000
6000
8000
10000
Central State Private Sector IPP Private Sector UTL ALL INDIA
All India Thermal PLF
Apr-2018 Apr-2019
2012-13 2013-14 2014-15 2015-16 2016-17 2017-18
TampD Losses 2304 2284 2277 2181 2142 2104
ATampC Losses 2548 2262 2572 2398 NA NA
Provisional
Note As per PFC for utilities selling directly to consumers NA- Not Available
Total Number of Villages
597464
Note From the year 2004-05 onwards Definition of Village Electrification-
A village would be declared Electrified if
Without
Subsidy
Gap ACS-
ARR(
Without
Subsidy)
Paiseunit
Gap ACS-
ARR (on
subsidy
booked
basis)
paiseunit
Gap ACS-
ARR (on
subsidyrece
ived basis)
paiseunit
2013-14 400 118 76 77
2014-15 412 108 58 60
Source- PFC Reports on the performance of State Power Utilities
2013-14 4894
2014-15 5304
2015-16 5459
2016-17 5743
2017-18 6080
2018-19 6289
11
11 T amp D and ATampC Losses ()
12 All India Village Electrification
Villiages Electrified (Nos)
10000All villages as per census 2011 has
been electrified on 28042018
Villages electrified
Average cost of supply(ACS)
(paiseunit)
i) Basic Infrastructure such as Distribution Transformer and Distribution lines are provided in the inhabited locality
as well as Dalit Basti hemlet where it exists (For electrification through Non-Conventional Energy Sources a
Distribution Transformer may not be necessary)
14 All India Coal consumption for Power Generation (MT)
520
Average Revenue Realization(paiseunit)
518
Year
ii) Electricity is provided to Public places like Schools Panchayat Office Health Centre Dispensaries Community
Centres etc and
iv) Mandatory Certification from Gram Panchayat regarding the completion of village electrification should be
obtained
13 Average cost of Power amp Average Realisation
iii) The number of households electrified should be at least 10 of the total number of households in the village
SN Contents Page
1 Capacity Addition Targets and Achievements in 12th Plan amp upto March2019 12
2 Capacity Addition Targets amp Achievements during Apr-2019 and Apr-19 to Apr-19 13
3 Installed Capacity in various Regions including their shares 14-19
Section B - Capacity Addition
(i) CAPACITY ADDTION TARGETS AND ACHIEVEMENTS IN THE 12TH PLAN Figures in MW
TARGET ACH TARGET ACH TARGET ACH TARGET ACH
CENTRAL 14878 15869 6004 2584 5300 2000 26182 20453
STATE 13922 22201 1608 2276 0 0 15530 24477
PRIVATE 43540 53661 3285 619 0 0 46825 54280
ALL INDIA 72340 91730 10897 5479 5300 2000 88537 99209
(ii) CAPACITY ADDITION TARGET AND ACHIEVEMENT FOR 2017-18 (IN MW)
THERMAL HYDRO NUCLEAR
TARGET ACH TARGET ACH TARGET ACH TARGET ACH
CENTRAL 4880 3170 800 390 500 6180 3560
STATE 3546 1760 300 200 0 3846 1960
PRIVATE 2940 3780 205 205 0 3145 3985
ALL INDIA 11366 8710 1305 795 500 0 13171 9505
(iii) CAPACITY ADDITION ACHIEVEMENT FOR 2018-19 (IN MW)
TARGET ACH TARGET ACH TARGET ACH TARGET ACH
CENTRAL 2760 1960 710 110 0 0 3470 2070
STATE 4506 2850 130 30 0 0 4636 2880
PRIVATE 0 972 0 0 0 0 0 972
ALL INDIA 7266 5782 840 140 0 0 8106 5922
12
SECTOR
SECTOR
TOTAL
TOTALNUCLEARHYDROTHERMAL
1 Capacity Addtion Targets and Achievements in the 12th Plan amp upto March2019
SECTORTHERMAL HYDRO NUCLEAR TOTAL
(MW)
Cummulative
Deviation
Target Achievement Target Achievement (+) (-)
Central 6040 500 0 500 0 -500
State 425615 660 0 660 0 -660
Private 0 0 0 0 0 0
Total 1029615 1160 0 1160 0 -1160
Central 600 0 0 0 0 0
State 21099 0 0 0 0 0
Private 379 0 0 0 0 0
Total 118999 0 0 0 0 0
Nuclear Central 700 0 0 0 0 0
Central 7340 500 0 500 0 -500
State 446714 660 0 660 0 -660
Private 379 0 0 0 0 0
Total 1218614 1160 0 1160 0 -1160
Electricity Generation (MU) Targets and Achievements for 2016-17
13
Hydro
All India
Capacity Addition TargetsAchievements during the Month of Apr-2019
Thermal
2 Capacity Addition Targets Achievements During Apr-2019
Schemes Sector
Target 2019-20
Apr-19 to Apr-19Apr-19
11
60
0 0
11
60
0 0 0 0
0
200
400
600
800
1000
1200
1400
Thermal Hydro Nuclear Total
MW
Targets and Achievement during 2019-20Target Achievement
0
200
400
600
800
1000
1200
Thermal Hydro Nuclear Total
1160
0 0
1160
0 0 00
MW
Target Achievement
Coal Lignite Gas Diesel Total
State 1634400 25000 287920 000 1947320 000 869755 69956 2887031
Private 2168083 108000 55800 000 2331883 000 251400 1312046 3895329
Central 1233537 25000 234406 000 1492943 162000 849622 37900 2542465
Sub Total 5036020 158000 578126 000 5772146 162000 1970777 1419902 9324825
State 2156000 104000 284982 000 2544982 000 544650 54789 3144421
Private 3474567 50000 467600 000 3992167 000 48100 2186476 6226743
Central 1650295 000 328067 000 1978362 184000 162000 66630 2390992
Sub Total 7280862 154000 1080649 000 8515511 184000 754750 2307894 11762155
State 1993250 000 79198 28788 2101236 000 1177483 58688 3337407
Private 1187450 25000 532210 27370 1772030 000 000 3749140 5521170
Central 1123502 289000 35958 000 1448460 332000 000 54190 1834650
Sub Total 4304202 314000 647366 56158 5321726 332000 1177483 3862018 10693227
State 624000 000 10000 000 634000 000 353792 27511 1015303
Private 638700 000 000 000 638700 000 39900 111637 790237
Central 1483664 000 000 000 1483664 000 100520 1000 1585184
Sub Total 2746364 000 10000 000 2756364 000 494212 140148 3390724
State 000 000 49771 3600 53371 000 42200 23325 118895
Private 000 000 2450 000 2450 000 000 6104 8554
Central 77002 000 125360 000 202362 000 100500 3000 305862
Sub Total 77002 000 177581 3600 258183 000 142700 32429 433311
State 000 000 000 4005 4005 000 000 525 4530
Private 000 000 000 000 000 000 000 738 738
Central 000 000 000 000 000 000 000 510 510
Sub Total 000 000 000 4005 4005 000 000 1773 5778
State 6407650 129000 711871 36393 7284913 000 2987880 234793 10507586
Private 7468800 183000 1058060 27370 8737230 000 339400 7366140 16442770
Central 5568000 314000 723791 000 6605791 678000 1212642 163230 8659663
Total 19444450 626000 2493722 63763 22627934 678000 4539922 7764163 35610019
Figures at decimal may not tally due to rounding off
Note -
(As per latest information available with MNRE)
Break up of RES all India as on 31032019 is given below (in MW)
459315 3562597 2818071 7764163
A 0 MW
B Apr 2019 0 MW
C
Apr 2019 0 MW
D Net Capacity Added during Apr 2019 A-B-C 0 MW
Sector wise breakup of RES capacity as shown is provisional
Share of installed capacity of BBMB Stations is included in state sector of partner states
BM PowerCogen Waste to Energy
910350 13830
Capacity Added during Apr 2019
Capacity Retired during
Capacity removed due to change
from Conventional to RES during
Islands
ALL INDIA
Abbreviation- SHP=Small Hydro Project (le 25 MW) BP=Biomass Power UampI=Urban amp Industrial Waste Power RES=Renewable Energy Sources
1 RES include SHP BP UampI Solar and Wind Energy Installed capacity in respect of RES (MNRE) as on 31032019
Small
Hydro PowerWind Power
Bio-PowerSolar Power
Total
Capacity
RES
(MNRE)
Northern Region
Western Region
Southern Region
Eastern Region
North Eastern
Region
ALL INDIA INSTALLED CAPACITY (IN MW) OF POWER STATIONS
(As on 30042019)
(UTILITIES)
Region Ownership Sector
Mode wise breakup
Grand TotalThermalNuclear Hydro
Coal Lignite Gas Diesel Total
State 13500 000 180040 000 193540 000 000 000 193540
Private 86922 000 10800 000 97722 000 000 17889 115611
Central 311272 000 20701 000 331973 10283 72309 000 414565
Sub-Total 411694 000 211541 000 623235 10283 72309 17889 723716
State 272000 000 15000 000 287000 000 110282 6930 404212
Private 408078 000 000 000 408078 000 20000 34512 462590
Central 129472 000 53561 000 183034 10094 66370181 500 259998
Sub-Total 809550 000 68561 000 878112 10094 196652 41942 1126799
State 000 000 000 000 000 000 69460 25661 95121
Private 000 000 000 000 000 000 99200 62668 161868
Central 18340 000 6201 000 24541 2895 122388 000 149824
Sub-Total 18340 000 6201 000 24541 2895 291048 88329 406813
State 000 000 17500 000 17500 000 123000 12903 153403
Private 000 000 000 000 000 000 000 6483 6483
Central 50639 000 12907 000 63547 6798 109188 000 179533
Sub-Total 50639 000 30407 000 81047 6798 232188 19386 339419
State 176000 000 15000 000 191000 000 259770 12780 463550
Private 511550 000 000 000 511550 000 28800 115462 655812
Central 85458 000 26401 000 111859 19681 92342 000 223882
Sub-Total 773008 000 41401 000 814409 19681 380912 128242 1343244
State 626000 25000 60380 000 711380 000 109618 2385 823383
Private 280200 108000 000 000 388200 000 10400 730181 1128781
Central 95625 25000 22110 000 142735 55674 73901 34400 306710
Sub-Total 1001825 158000 82490 000 1242315 55674 193919 766966 2258874
State 546900 000 000 000 546900 000 72410 2510 621820
Private 871433 000 000 000 871433 000 84200 288760 1244393
Central 379639 000 54949 000 434588 28948 180253 3000 646789
Sub-Total 1797972 000 54949 000 1852921 28948 336863 294270 2513002
State 000 000 000 000 000 000 125215 6787 132002
Private 9900 000 45000 000 54900 000 8800 52620 116320
Central 34324 000 6966 000 41290 3124 47554 000 91968
Sub-Total 44224 000 51966 000 96190 3124 181569 59407 340290
State 000 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 000 3471 3471
Central 3815 000 1503 000 5317 801 10171 000 16289
Sub-Total 3815 000 1503 000 5317 801 10171 3471 19760
124953 000 29105 000 154058 23703 75145 000 252907
State 1634400 25000 287920 000 1947320 000 869755 69956 2887031
Private 2168083 108000 55800 000 2331883 000 251400 1312046 3895329
Central 1233537 25000 234406 000 1492943 162000 849622 37900 2542465
Grand Total 5036020 158000 578126 000 5772146 162000 1970777 1419902 9324825
Delhi
Haryana
Himachal Pradesh
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
NORTHERN REGION
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
(As on 30042019)
State Ownership Sector
Mode wise breakup
Grand TotalThermalNuclear Hydro
RES
(MNRE)
Jammu amp Kashmir
Punjab
Rajasthan
Uttar Pradesh
Uttarakhand
Chandigarh
Central - Unallocated
Total (Northern
Region)
(As on 30042019)
Coal Lignite Gas Diesel Total
State 000 000 000 000 000 000 000 005 005
Private 000 000 4800 000 4800 000 000 392 5192
Central 46959 000 1967 000 48926 2600 000 000 51526
Sub-Total 46959 000 6767 000 53726 2600 000 397 56723
State 000 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 000 1447 1447
Central 14141 000 4334 000 18475 700 000 000 19175
Sub-Total 14141 000 4334 000 18475 700 000 1447 20622
State 371000 104000 217782 000 692782 000 77200 6470 776452
Private 726567 50000 396000 000 1172567 000 000 833180 2005747
Central 324243 000 42400 000 366643 55900 000 24330 446873
Sub-Total 1421810 154000 656182 000 2231992 55900 77200 863980 3229072
State 540000 000 000 000 540000 000 170366 8396 718762
Private 617400 000 10000 000 627400 000 000 418040 1045440
Central 334238 000 25700 000 359938 27300 152000 30000 569238
Sub-Total 1491638 000 35700 000 1527338 27300 322366 456436 2333440
State 228000 000 000 000 228000 000 12000 1105 241105
Private 885000 000 000 000 885000 000 000 52430 937430
Central 211075 000 000 000 211075 4800 10000 000 225875
Sub-Total 1324075 000 000 000 1324075 4800 22000 53535 1404410
State 1017000 000 67200 000 1084200 000 285084 38813 1408097
Private 1245600 000 56800 000 1302400 000 48100 880441 2230941
Central 466780 000 227273 000 694053 69000 000 12300 775353
Sub-Total 2729380 000 351273 000 3080653 69000 333184 931553 4414390
State 000 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 000 546 546
Central 19560 000 6634 000 26194 900 000 000 27094
Sub-Total 19560 000 6634 000 26194 900 000 546 27640
233300 000 19759 000 253059 22800 000 000 275859
State 2156000 104000 284982 000 2544982 000 544650 54789 3144421
Private 3474567 50000 467600 000 3992167 000 48100 2186476 6226743
Central 1650295 000 328067 000 1978362 184000 162000 66630 2390992
Grand Total 7280862 154000 1080649 000 8515511 184000 754750 2307894 11762155
Goa
Daman amp Diu
Gujarat
Madhya Pradesh
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
WESTERN REGION
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
ThermalNuclear Hydro
RES
(MNRE)
State Ownership Sector
Mode wise breakup
Grand Total
Chhattisgarh
Maharashtra
Dadra amp Nagar
Naveli
Central - Unallocated
Total (Western
Region)
(As on 30042019)
Coal Lignite Gas Diesel Total
State 501000 000 23540 000 524540 000 167360 5618 697518
Private 387388 000 381318 3680 772386 000 000 743342 1515728
Central 154683 12773 000 000 167456 12727 000 25000 205183
Sub-Total 1043071 12773 404858 3680 1464382 12727 167360 773960 2418429
State 558250 000 000 000 558250 000 247993 4122 810365
Private 83945 000 83182 000 167127 000 000 393644 560771
Central 180685 14927 000 000 195612 14873 000 1000 211485
Sub-Total 822880 14927 83182 000 920989 14873 247993 398766 1582621
State 502000 000 000 12792 514792 000 358660 19389 892841
Private 195850 000 000 2520 198370 000 000 1363591 1561961
Central 242780 40140 000 000 282920 69800 000 000 352720
Sub-Total 940630 40140 000 15312 996082 69800 358660 1382979 2807521
State 000 000 000 15996 15996 000 185650 17290 218936
Private 61500 000 17400 000 78900 000 000 19021 97921
Central 86142 28180 35958 000 150280 36200 000 5000 191480
Sub-Total 147642 28180 53358 15996 245176 36200 185650 41311 508337
State 432000 000 52408 000 484408 000 217820 12270 714498
Private 458767 25000 50310 21170 555247 000 000 1229228 1784475
Central 302532 136420 000 000 438952 144800 000 23190 606942
Sub-Total 1193299 161420 102718 21170 1478607 144800 217820 1264688 3105915
State 000 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 000 000 000
Central 000 10000 000 000 10000 000 000 000 10000
Sub-Total 000 10000 000 000 10000 000 000 000 10000
State 000 000 3250 000 3250 000 000 000 3250
Private 000 000 000 000 000 000 000 314 314
Central 14080 10760 000 000 24840 8600 000 000 33440
Sub-Total 14080 10760 3250 000 28090 8600 000 314 37004
142600 35800 000 000 178400 45000 000 000 223400
State 1993250 000 79198 28788 2101236 000 1177483 58688 3337407
Private 1187450 25000 532210 27370 1772030 000 000 3749140 5521170
Central 1123502 289000 35958 000 1448460 332000 000 54190 1834650
Grand Total 4304202 314000 647366 56158 5321726 332000 1177483 3862018 10693227
Kerala
Andhra Pradesh
Telangana
Karnataka
Total (Southern
Region)
Tamil Nadu
NLC
Puducherry
Central - Unallocated
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
SOUTHERN REGION
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
State Ownership Sector
Mode wise breakup
Grand TotalThermalNuclear Hydro
RES
(MNRE)
(As on 30042019)
Coal Lignite Gas Diesel Total
State 000 000 000 000 000 000 000 7070 7070
Private 28100 000 000 000 28100 000 000 25545 53645
Central 384933 000 000 000 384933 000 11000 000 395932
Sub-Total 413033 000 000 000 413033 000 11000 32615 456647
State 42000 000 000 000 42000 000 13000 405 55405
Private 73000 000 000 000 73000 000 000 3495 76495
Central 39374 000 000 000 39374 000 6100 000 45474
Sub-Total 154374 000 000 000 154374 000 19100 3900 177374
State 540000 000 10000 000 550000 000 98600 12195 660795
Private 243700 000 000 000 243700 000 000 35250 278950
Central 76077 000 000 000 76077 000 41000 000 117077
Sub-Total 859777 000 10000 000 869777 000 139600 47445 1056822
State 000 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 000 000 000
Central 698504 000 000 000 698504 000 18620 000 717124
Sub-Total 698504 000 000 000 698504 000 18620 000 717124
State 42000 000 000 000 42000 000 206192 2630 250822
Private 293900 000 000 000 293900 000 000 47346 341246
Central 163390 000 000 000 163390 000 8900 1000 173290
Sub-Total 499290 000 000 000 499290 000 215092 50976 765358
State 000 000 000 000 000 000 36000 5211 41211
Private 000 000 000 000 000 000 39900 001 39901
Central 8703 000 000 000 8703 000 6400 000 15103
Sub-Total 8703 000 000 000 8703 000 82300 5212 96215
112683 000 000 000 112683 000 8501 000 121184
State 624000 000 10000 000 634000 000 353792 27511 1015303
Private 638700 000 000 000 638700 000 39900 111637 790237
Central 1483664 000 000 000 1483664 000 100520 1000 1585184
Grand Total 2746364 000 10000 000 2756364 000 494212 140148 3390724
Total (Eastern
Region)
Bihar
Jharkhand
West Bengal
DVC
Odisha
Sikkim
Central - Unallocated
HydroOwnership Sector
Mode wise breakup
Grand TotalThermalNuclear
RES
(MNRE)
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
State
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
EASTERN REGION
(As on 30042019)
Coal Lignite Gas Diesel Total
State 000 000 32821 000 32821 000 10000 501 43322
Private 000 000 2450 000 2450 000 000 2650 5100
Central 40852 000 43556 000 84408 000 35708 2500 122616
Sub-Total 40852 000 78827 000 119679 000 45708 5651 171038
State 000 000 000 000 000 000 000 10711 10711
Private 000 000 000 000 000 000 000 2939 2939
Central 3705 000 4682 000 8387 000 11655 000 20042
Sub-Total 3705 000 4682 000 8387 000 11655 13650 33692
State 000 000 000 000 000 000 32200 3253 35453
Private 000 000 000 000 000 000 000 012 012
Central 4560 000 10969 000 15529 000 7227 000 22756
Sub-Total 4560 000 10969 000 15529 000 39427 3265 58221
State 000 000 16950 000 16950 000 000 1601 18551
Private 000 000 000 000 000 000 000 009 009
Central 5610 000 43695 000 49305 000 6849 500 56654
Sub-Total 5610 000 60645 000 66255 000 6849 2110 75214
State 000 000 000 3600 3600 000 000 545 4145
Private 000 000 000 000 000 000 000 344 344
Central 4710 000 7157 000 11867 000 9534 000 21401
Sub-Total 4710 000 7157 3600 15467 000 9534 889 25890
State 000 000 000 000 000 000 000 3067 3067
Private 000 000 000 000 000 000 000 100 100
Central 3210 000 4893 000 8103 000 5733 000 13836
Sub-Total 3210 000 4893 000 8103 000 5733 3167 17003
State 000 000 000 000 000 000 000 3647 3647
Private 000 000 000 000 000 000 000 050 050
Central 3105 000 4046 000 7151 000 9794 000 16945
Sub-Total 3105 000 4046 000 7151 000 9794 3697 20642
11250 000 6362 000 17612 000 14000 000 31612
State 000 000 49771 3600 53371 000 42200 23325 118895
Private 000 000 2450 000 2450 000 000 6104 8554
Central 77002 000 125360 000 202362 000 100500 3000 305862
Grand Total 77002 000 177581 3600 258183 000 142700 32429 433311
Assam
Arunachal Pradesh
Meghalaya
Tripura
Manipur
Nagaland
Mizoram
Central - Unallocated
Total (North-
Eastern Region)
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
NORTH-EASTERN REGION
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
State Ownership Sector
Mode wise breakup
Grand TotalThermalNuclear Hydro
RES
(MNRE)
(As on 30042019)
Coal Lignite Gas Diesel Total
State 000 000 000 4005 4005 000 000 525 4530
Private 000 000 000 000 000 000 000 663 663
Central 000 000 000 000 000 000 000 510 510
Sub-Total 000 000 000 4005 4005 000 000 1698 5703
State 000 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 000 075 075
Central 000 000 000 000 000 000 000 000 000
Sub-Total 000 000 000 000 000 000 000 075 075
State 000 000 000 4005 4005 000 000 525 4530
Private 000 000 000 000 000 000 000 738 738
Central 000 000 000 000 000 000 000 510 510
Grand Total 000 000 000 4005 4005 000 000 1773 5778
Andaman amp
Nicobar
Lakshadweep
Total (Islands)
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
ISLANDS
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
State Ownership Sector
Mode wise breakup
Grand TotalThermalNuclear Hydro
RES
(MNRE)
SrNo Contents Page
1 Executive summary of Target and Achievement of Transmission Lines during 2019-20
20(1)
2 List of Transmission Lines CommissionedReady for commissioning during Apr-2019 20(2)
Section C - Transmission Lines
1 Executive summary of Target and Achievement of Transmission Lines during 2019-20 As on 30-04-19
(All figures in circuit kms)
Ce
ntr
al S
ecto
r
Sta
te S
ecto
r
JV
Pri
va
te S
ecto
r
To
tal
Ce
ntr
al S
ecto
r
Sta
te S
ecto
r
JV
Pri
va
te S
ecto
r
To
tal
Ce
ntr
al S
ecto
r
Sta
te S
ecto
r
JV
Pri
va
te S
ecto
r
To
tal
Ce
ntr
al S
ecto
r
Sta
te S
ecto
r
JV
Pri
va
te S
ecto
r
To
tal
Ce
ntr
al S
ecto
r
Sta
te S
ecto
r
JV
Pri
va
te S
ecto
r
To
tal
Ce
ntr
al
Se
cto
r
Sta
te S
ec
tor
JV
Pri
va
te S
ec
tor
Gra
nd
To
tal
0 0 0 0 0 0 0 0 2727 958 2334 6019 2239 3416 1143 6798 781 10023 0 10804 5747 14397 3477 23621
Apr19 Programme 0 0 0 0 0 0 0 0 577 416 557 1550 60 890 203 1153 0 309 0 309 637 1615 760 3012
Achievement 0 0 0 0 0 0 0 0 53 0 0 53 0 20 0 20 0 401 0 401 53 421 0 474
Upto Apr-19 Programme 0 0 0 0 0 0 0 0 577 416 557 1550 60 890 203 1153 0 309 0 309 637 1615 760 3012
Achievement 0 0 0 0 0 0 0 0 53 0 0 53 0 20 0 20 0 401 0 401 53 421 0 474
20(1)
220 kV Grand Total 800 kV 500 kV
Programme 2019-20
Programme
Achievement
HVDC765 kV 400 kV
Line
1 2 3 4 5 6
1 400 Bhadla (PG) - Bhadla (RVPN) line DC PGCIL 53
53
2 400 LILO of one ckt Jhanor - Navsari at Vav Ss DC GETCO 20
3 220 Banda-Chitrakoot Line DC UPPTCL 226
4 220 Gorakhpur (PG)-Gola line DC UPPTCL 82
5 220 Hapur(765) - Faridnagar line SC UPPTCL 11
6 220 Kalikiri - Madanapalli line DC APTRANSCO 60
7 220LILO of Gr Noida -Noida Sec-129 at Noida
Sec-148DC UPPTCL 1
8 220LILO of one Ckt of Badshahpur Pali at Sec-
65 GurgaonDC HVPNL 3
9 220 Sultanpur-Sangipur LILO Section at Amethi DC UPPTCL 18
421
0
474
20(2)
Grand Total
2Transmission Lines (220 kV and above) CommissionedReady for commissioning During Apr-2019
Voltage
Level (kV)Name of Transmission Lines
Circuit
Type
Executing
Agency
CENTRAL SECTOR
Total of CENTRAL SECTOR
STATE SECTOR Sector
Total of STATE SECTOR
PRIVATE SECTOR
Total of PRIVATE SECTOR
SlNo
Length(CKm)
As on 30-04-19
SN Contents Page
1 Executive summary of Target and Achievement of Substations during 2019-20 21(1)
2Sub Stations (220 kV and above) commissionedready for commisssioning during Apr-
201921(2)
Section D - Sub Stations
1 Executive summary of Target and Achievement of Substations during 2019-2020 As on 30-04-19
(All figures in circuit MVA)
Ce
ntr
al S
ecto
r
Sta
te S
ecto
r
JV
Pri
va
te S
ecto
r
To
tal
Ce
ntr
al S
ecto
r
Sta
te S
ecto
r
JV
Pri
va
te S
ecto
r
To
tal
Ce
ntr
al S
ecto
r
Sta
te S
ecto
r
JV
Pri
va
te S
ecto
r
To
tal
Ce
ntr
al S
ecto
r
Sta
te S
ecto
r
JV
Pri
va
te S
ecto
r
To
tal
Ce
ntr
al S
ecto
r
Sta
te S
ecto
r
JV
Pri
va
te S
ecto
r
To
tal
Ce
ntr
al S
ec
tor
Sta
te S
ec
tor
JV
Pri
va
te S
ec
tor
Gra
nd
To
tal
3000 0 0 3000 0 0 0 0 18000 3000 6000 27000 5205 19665 4260 29130 800 21786 0 22586 27005 44451 10260 81716
Apr19 Programme 0 0 0 0 0 0 0 0 3000 0 3000 6000 0 1000 2000 3000 0 800 0 800 3000 1800 5000 9800
Achievement 0 0 0 0 0 0 0 0 500 0 0 500 815 1980 0 2795 0 1305 0 1305 1315 3285 0 4600
Upto Apr-19 Programme 0 0 0 0 0 0 0 0 3000 0 3000 6000 0 1000 2000 3000 0 800 0 800 3000 1800 5000 9800
Achievement 0 0 0 0 0 0 0 0 500 0 0 500 815 1980 0 2795 0 1305 0 1305 1315 3285 0 4600
21(1)
220 kV Grand Total 800 kV 500 kV
Programme 2019-20
Programme
Achievement
HVDC765 kV 400 kV
As on 30-04-19
Sl Voltage Ratio Capacity
No (kVkV) (MWMVA)
1 2 3 4 5
1 Bhadla SS (3x1500 3x500 MVA) 765400 PGCIL 500
2 Extn at Tumkur (Pavagada ) PS (2x500 MVA) 400220 PGCIL 500
3 Bongaigaon (2nd ICT) Ss 400220 PGCIL 315
Total of CENTRAL SECTOR 1315
4 Motiram Adda Gorakhpur (Aug) (Additional TF) 400220 UPPTCL 240
5 Muradnagar-II Ghaziabad (Aug) (Additional TF) 400220 UPPTCL 240
6 Noida Sec- 148 GBNagar (New) 400220 UPPTCL 5007 Sarnath Varanasi (Aug) TF- II (500-315) 400220 UPPTCL 1858 Sarojininagar Lucknow Aug) TF- II (500-315) 400220 UPPTCL 185
9 Unnao (Aug) TF-III 400220 UPPTCL 31510 Nawada SS 400220 HVPNL 31511 Kharepatan SS 22033 MSETCL 2512 Prathipadu SS 220132 APTRANSCO 10013 Pali Ss 22066 HVPNL 160
14 A-5 Faridabad Ss 22066 HVPNL 60
15 Rentachintala Ss Aug(3X100-2x100) 220132 APTRANSCO 10016 Amethi Ss 220132 UPPTCL 160
17 Gajokhar Varanasi (Aug) TF- II (160-100) 220132 UPPTCL 60
18 Gola Gorakhpur (New) 220132 UPPTCL 160
19 Khurja Bulandshahr (Aug) TF- II (200-160) 220132 UPPTCL 40
20 RC Green GB Nagar (Aug) TF-II (160-100) 220132 UPPTCL 60
21 Sikandrabad Bulandshahr (Aug) (Additional TF) 220132 UPPTCL 160
22 Sitapur (Aug) (Additional TF) 220132 UPPTCL 160
23 Sohawal Ayodhya (Aug) TF-II (160-100) 220132 UPPTCL 60
TOTAL STATE SECTOR 3285
GRAND TOTAL 4600
21(2)
CENTRAL SECTOR
STATE SECTOR
2Sub-Stations (220 kV and above) CommissionedReady for commissioning During Apr-2019
Name of Sub Stations Executing Agency
SN Contents Page
1 Electricity Generation (MU) Targets and Achievements for 2019-20 22
Section E - Electricity Generation
Programme Achievement Ach Programme Achievement Ach
Central Sector 37545100 3177900 3129530 9848 3177900 3129530 9848
State Sector 37498600 3322500 2950558 8881 3322500 2950558 8881
PvtIPP Sector 37346200 3236400 3195940 9875 3236400 3195940 9875
PvtUTL Sector 1823100 159300 165579 10394 159300 165579 10394
Total 114213000 9896100 9441607 9541 9896100 9441607 9541
Central Sector 5661700 386100 481390 12468 386100 481390 12468
State Sector 6680500 498200 536514 10769 498200 536514 10769
PvtIPP Sector 1206900 57300 80405 14032 57300 80405 14032
PvtUTL Sector 144100 12300 10930 8886 12300 10930 8886
Total 13693200 953900 1109239 11628 953900 1109239 11628
Central Sector 4472000 367300 317765 8651 367300 317765 8651
Total 4472000 367300 317765 8651 367300 317765 8651
Bhutan Import 621800 17500 24396 13941 17500 24396 13941
Central Sector 47678800 3931300 3928685 9993 3931300 3928685 9993
State Sector 44179100 3820700 3487072 9127 3820700 3487072 9127
Pvt Sector 40520300 3465300 3452854 9964 3465300 3452854 9964
Total 133000000 11234800 10893007 9696 11234800 10893007 9696
Provisional based on actual-cum-Assesment
Figs in MU
Cummulative
Achievement
Cummulative
Achievement
Mar-19 Mar-18 Upto Mar-2019 Upto Mar-2018
984785 869291 12675910 10183949
22
1 Electricity Generation (MU) Targets and Achievememts for 2019-20
All India Energy Generation During Apr-19 to Apr-19 (MU)
Target (2019-20)Apr-19 to Apr-19
Sector
Hydro
Thermal
Nuclear
Renewable Energy Generation
Achievement
Apr-2019
98961
95393673
112348
94416
11092
3178
108930
0
20000
40000
60000
80000
100000
120000
Thermal Hydro Nuclear Total
Programme
Achievement
SN Contents Page
1 Energy Power Supply Position (Provisional) for Apr-2019 and during Apr-19 to Apr-19 23
2 Peak Power Supply Position (Provisional) for Apr-2019 and during Apr-19 to Apr-19 24
3 Energy Power Supply Position (Revised) for Mar-2019 and during Apr-19 to Mar-19 25
4 Peak Power Supply Position (Revised) for Mar-2019 and during Apr-19 to Mar-19 26
5 Notified Power cuts Restrictions on Industries during Apr-2019 27
6 Power Supply to Agricultural Sector during Apr-2019 28
Section F - Power supply position
आकड़ मममलयन यननट नट Figures in MU net
ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied
कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )
चडीगढ़ Chandigarh 117 117 0 00 117 117 0 00
दिलली Delhi 2698 2698 1 00 2698 2698 1 00
हरियजणज Haryana 3773 3773 0 00 3773 3773 0 00
दहमजचल परिश Himachal Pradesh 777 777 0 00 777 777 0 00
रमम कशमीि Jammu amp Kashmir 1604 1296 308 192 1604 1296 308 192
परजब Punjab 3646 3646 0 00 3646 3646 0 00
िजरसथजन Rajasthan 6210 6208 2 00 6210 6208 2 00
उतति परिश Uttar Pradesh 10179 10148 32 03 10179 10148 32 03
उततिजखड Uttarakhand 1120 1120 0 00 1120 1120 0 00
उततरी कषतर Northern Region 30094 29786 308 10 30094 29786 308 10
छततीसगढ़ Chhattisgarh 2684 2676 8 03 2684 2676 8 03
गरिजत Gujarat 10718 10718 0 00 10718 10718 0 00
मधय परिश Madhya Pradesh 6006 6006 0 00 6006 6006 0 00
महजिजषटर Maharashtra 14308 14308 0 00 14308 14308 0 00
िमन औि दिउ Daman amp Diu 220 220 0 00 220 220 0 00
िजिि व नगि हवली Dadra amp Nagar Haveli 552 552 0 00 552 552 0 00
गोवज Goa 388 388 0 00 388 388 0 00
पशचिमी कषतर Western Region 34875 34868 8 00 34875 34868 8 00
आनधर परिश Andhra Pradesh 5708 5708 0 00 5708 5708 0 00
तलगजनज Telangana 5725 5725 0 00 5725 5725 0 00
कनजाटक Karnataka 7003 7003 0 00 7003 7003 0 00
किल Kerala 2402 2400 2 01 2402 2400 2 01
तममल नजड Tamil Nadu 10010 10010 0 00 10010 10010 0 00
पडचिी Puducherry 263 263 0 00 263 263 0 00
लकष-दवीप Lakshadweep 4 4 0 0 4 4 0 0
दकषकषणी कषतर Southern Region 31111 31109 2 00 31111 31109 2 00
बबहजि Bihar 2589 2589 0 00 2589 2589 0 00
िजमोिि घजटी ननगम DVC 1772 1772 0 00 1772 1772 0 00
झजिखणड Jharkhand 689 689 0 00 689 689 0 00
ओडडशज Odisha 2689 2689 1 00 2689 2689 1 00
पशशचम बगजल West Bengal 5075 5075 0 00 5075 5075 0 00
मसशककम Sikkim 37 37 0 00 37 37 0 00
अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 7 29 27 2 7
परवी कषतर Eastern Region 12851 12850 1 00 12851 12850 1 00
अरणजचल परिश Arunachal Pradesh 66 66 0 05 66 66 0 05
असम Assam 766 709 57 75 766 709 57 75
मणणपि Manipur 68 67 1 15 68 67 1 15
मघजलय Meghalaya 170 160 10 59 170 160 10 59
ममज़ोिम Mizoram 54 53 0 08 54 53 0 08
नजगजलड Nagaland 54 54 0 08 54 54 0 08
बिपिज Tripura 122 120 1 12 122 120 1 12
उततर-परवी कषतर North-Eastern Region 1300 1228 71 55 1300 1228 71 55
समपणण भारत All India 110231 109842 389 04 110231 109842 389 04
23
ऊरजा पनत ा म कमी ऊरजा पनत ा म कमीEnergy not Supplied
Excludes energy exported to Bangladesh
Energy not Supplied
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
ऊराण वरवदयत आपरत ण शथिरत ररपोरण (परवाणरवलोकन) Energy Power Supply Position Report (Provisional)
राजयState
अपरल 2019 April2019 अपरल2019 -अपरल2019 April2019 to April2019
अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met
कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )
चडीगढ़ Chandigarh 256 256 0 00 256 256 0 00
दिलली Delhi 5664 5664 0 00 5664 5664 0 00
हरियजणज Haryana 8127 8127 0 00 8127 8127 0 00
दहमजचल परिश Himachal Pradesh 1387 1387 0 00 1387 1387 0 00
रमम कशमीि Jammu amp Kashmir 2826 2261 565 200 2826 2261 565 200
परजब Punjab 7015 7015 0 00 7015 7015 0 00
िजरसथजन Rajasthan 10560 10560 0 00 10560 10560 0 00
उतति परिश Uttar Pradesh 19935 19935 0 00 19935 19935 0 00
उततिजखड Uttarakhand 1922 1922 0 00 1922 1922 0 00
उततरी कषतर Northern Region 54476 53985 491 09 54476 53985 491 09
छततीसगढ़ Chhattisgarh 4596 4574 22 05 4596 4574 22 05
गरिजत Gujarat 17871 17865 6 00 17871 17865 6 00
मधय परिश Madhya Pradesh 10018 10018 0 00 10018 10018 0 00
महजिजषटर Maharashtra 23158 23150 8 00 23158 23150 8 00
िमन औि दिउ Daman amp Diu 341 340 1 02 341 340 1 02
िजिि व नगि हवली Dadra amp Nagar Haveli 818 818 0 00 818 818 0 00
गोवज Goa 594 594 0 00 594 594 0 00
पशचिमी कषतर Western Region 56242 56222 20 00 56242 56222 20 00
आनधर परिश Andhra Pradesh 9151 9151 0 00 9151 9151 0 00
तलगजनज Telangana 10191 10191 0 00 10191 10191 0 00
कनजाटक Karnataka 12681 12681 0 00 12681 12681 0 00
किल Kerala 4309 4300 8 02 4309 4300 8 02
तममल नजड Tamil Nadu 15972 15972 0 00 15972 15972 0 00
पडचिी Puducherry 482 480 2 05 482 480 2 05
लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0
दकषकषणी कषतर Southern Region 49155 49103 52 01 49155 49103 52 01
बबहजि Bihar 5357 5357 0 00 5357 5357 0 00
िजमोिि घजटी ननगम DVC 3039 3039 0 00 3039 3039 0 00
झजिखणड Jharkhand 1266 1266 0 00 1266 1266 0 00
ओडडशज Odisha 5389 5389 0 00 5389 5389 0 00
पशशचम बगजल West Bengal 8666 8666 0 00 8666 8666 0 00
मसशककम Sikkim 100 100 0 00 100 100 0 00
अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7
परवी कषतर Eastern Region 23349 23349 0 00 23349 23349 0 00
अरणजचल परिश Arunachal Pradesh 139 136 3 22 139 136 3 22
असम Assam 1712 1667 45 26 1712 1667 45 26
मणणपि Manipur 197 188 9 46 197 188 9 46
मघजलय Meghalaya 336 336 0 00 336 336 0 00
ममज़ोिम Mizoram 116 113 3 26 116 113 3 26
नजगजलड Nagaland 157 131 26 166 157 131 26 166
बिपिज Tripura 292 291 1 03 292 291 1 03
उततर-परवी कषतर North-Eastern Region 2848 2780 68 24 2848 2780 68 24
समपणण भारत All India 177411 176810 601 03 177411 176810 601 03
24
मजग की पनत ा म कमी Demand not Met
Excludes the supply to Bangladesh
राजयStateअपरल 2019 April2019
मजग की पनत ा म कमी Demand not Met
अधिकतम वरवदयत आपरत ण शथिरत ररपोरण (परवाणरवलोकन) Peak Power Supply Position Report (Provisional)
आकड़ मगज वजट नट Figures in MW netअपरल2019 -अपरल2019 April2019 to April2019
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
आकड़ मममलयन यननट नट Figures in MU net
ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied
कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )
चडीगढ़ Chandigarh 96 96 0 00 1561 1561 0 00
दिलली Delhi 1931 1930 1 00 32299 32282 17 01
हरियजणज Haryana 3658 3658 0 00 53665 53665 0 00
दहमजचल परिश Himachal Pradesh 832 830 2 02 9850 9618 232 24
रमम कशमीि Jammu amp Kashmir 1767 1414 353 200 19593 15868 3725 190
परजब Punjab 3585 3585 0 00 55288 55275 13 00
िजरसथजन Rajasthan 6774 6770 4 01 79826 79637 189 02
उतति परिश Uttar Pradesh 8754 8691 63 07 117101 116118 984 08
उततिजखड Uttarakhand 1067 1067 0 00 13845 13753 92 07
उततरी कषतर Northern Region 28464 28041 423 15 383028 377776 5251 14
छततीसगढ़ Chhattisgarh 2464 2457 8 03 26130 26076 54 02
गरिजत Gujarat 9890 9890 0 00 116588 116572 15 00
मधय परिश Madhya Pradesh 6236 6236 0 00 75667 75665 2 00
महजिजषटर Maharashtra 13631 13631 0 00 158285 158148 137 01
िमन औि दिउ Daman amp Diu 221 221 0 00 2557 2557 0 00
िजिि व नगि हवली Dadra amp Nagar Haveli 553 553 0 00 6317 6317 0 00
गोवज Goa 362 362 0 00 4283 4280 3 01
पशचिमी कषतर Western Region 33357 33349 8 00 389827 389615 212 01
आनधर परिश Andhra Pradesh 6072 6071 1 00 63735 63677 58 01
तलगजनज Telangana 6930 6929 1 00 66697 66635 62 01
कनजाटक Karnataka 7614 7612 1 00 71759 71690 69 01
किल Kerala 2489 2488 1 00 25029 24911 118 05
तममल नजड Tamil Nadu 10247 10245 2 00 109375 109273 102 01
पडचिी Puducherry 252 251 1 04 2761 2751 10 03
लकष-दवीप Lakshadweep 4 4 0 0 46 46 0 0
दकषकषणी कषतर Southern Region 33605 33597 8 00 339355 338938 417 01
बबहजि Bihar 2319 2318 1 00 30052 29827 225 07
िजमोिि घजटी ननगम DVC 1773 1772 1 00 22365 21995 369 17
झजिखणड Jharkhand 698 697 1 01 8682 8461 221 25
ओडडशज Odisha 2583 2582 1 00 31810 31781 30 01
पशशचम बगजल West Bengal 4585 4584 2 00 52237 52078 159 03
मसशककम Sikkim 41 41 0 00 513 512 0 01
अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 67 346 323 23 67
परवी कषतर Eastern Region 11999 11995 5 00 145658 144654 1004 07
अरणजचल परिश Arunachal Pradesh 61 60 0 06 864 855 9 10
असम Assam 680 656 23 34 9532 9204 328 34
मणणपि Manipur 68 68 1 09 916 906 10 11
मघजलय Meghalaya 173 173 0 03 1955 1953 1 01
ममज़ोिम Mizoram 50 49 0 09 668 661 8 12
नजगजलड Nagaland 58 57 1 20 902 809 93 103
बिपिज Tripura 150 150 0 00 1859 1837 21 11
उततर-परवी कषतर North-Eastern Region 1240 1214 26 21 16696 16225 471 28
समपणण भारत All India 108665 108196 469 04 1274564 1267209 7355 06
Note The revised data for March 2019 is not avaliable
Excludes energy exported to Bangladesh
राजयState
ऊराण वरवदयत आपरत ण शथिरत ररपोरण (परवाणरवलोकन) Energy Power Supply Position Report (Provisional)
25
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
Energy not Supplied Energy not Supplied
मािण2019 March2019 अपरल2018 -मािण2019 April2018 to March2019
ऊरजा पनत ा म कमी ऊरजा पनत ा म कमी
अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met
कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )
चडीगढ़ Chandigarh 223 223 0 00 369 369 0 00
दिलली Delhi 4016 4016 0 00 7016 7016 0 00
हरियजणज Haryana 6544 6544 0 00 10270 10270 0 00
दहमजचल परिश Himachal Pradesh 1683 1683 0 00 1700 1700 0 00
रमम कशमीि Jammu amp Kashmir 3277 2622 655 200 3277 2622 655 200
परजब Punjab 6564 6564 0 00 12638 12638 0 00
िजरसथजन Rajasthan 11885 11885 0 00 13276 13276 0 00
उतति परिश Uttar Pradesh 16220 16220 0 00 20498 20062 436 21
उततिजखड Uttarakhand 2002 2002 0 00 2216 2216 0 00
उततरी कषतर Northern Region 47925 47356 569 12 63166 61726 1440 23
छततीसगढ़ Chhattisgarh 4444 4128 316 71 4444 4270 174 39
गरिजत Gujarat 16263 16263 0 00 17053 16963 90 05
मधय परिश Madhya Pradesh 12328 12323 5 00 13815 13815 0 00
महजिजषटर Maharashtra 22361 22291 70 03 23864 23254 610 26
िमन औि दिउ Daman amp Diu 336 336 0 01 357 356 1 02
िजिि व नगि हवली Dadra amp Nagar Haveli 800 799 1 01 816 815 1 01
गोवज Goa 538 538 0 00 596 596 0 00
पशचिमी कषतर Western Region 53132 52965 167 03 56675 55821 853 15
आनधर परिश Andhra Pradesh 8977 8977 0 00 9459 9453 6 01
तलगजनज Telangana 10471 10471 0 00 10815 10815 0 00
कनजाटक Karnataka 12841 12841 0 00 12841 12841 0 00
किल Kerala 4264 4228 36 09 4264 4228 36 09
तममल नजड Tamil Nadu 15712 15712 0 00 15712 15712 0 00
पडचिी Puducherry 427 412 15 34 427 412 15 34
लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0
दकषकषणी कषतर Southern Region 49464 49464 0 00 49464 49464 0 00
बबहजि Bihar 4633 4633 0 00 5115 5084 31 06
िजमोिि घजटी ननगम DVC 3035 3035 0 00 3035 3035 0 00
झजिखणड Jharkhand 1210 1210 0 00 1339 1291 48 36
ओडडशज Odisha 4827 4827 0 00 5357 5357 0 00
पशशचम बगजल West Bengal 8287 8287 0 00 9130 9123 7 01
मसशककम Sikkim 100 100 0 00 106 106 0 00
अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7
परवी कषतर Eastern Region 21658 21658 0 00 23141 22733 408 18
अरणजचल परिश Arunachal Pradesh 133 131 2 15 138 138 0 01
असम Assam 1539 1508 31 20 1865 1809 56 30
मणणपि Manipur 204 199 5 25 219 216 3 12
मघजलय Meghalaya 357 357 0 00 374 372 1 04
ममज़ोिम Mizoram 108 105 3 28 121 119 2 17
नजगजलड Nagaland 127 125 2 16 156 138 18 116
बिपिज Tripura 249 249 0 00 298 293 5 17
उततर-परवी कषतर North-Eastern Region 2540 2535 5 02 2967 2850 117 39
समपणण भारत All India 169464 168745 719 04 177022 175528 1494 08
Note The revised data for March 2019 is not avaliable 26
अधिकतम वरवदयत आपरत ण शथिरत ररपोरण (परवाणरवलोकन) Peak Power Supply Position Report (Provisional)
आकड़ मगज वजट नट Figures in MW net
राजयStateमािण2019 March2019 अपरल2018 -मािण2019 April2018 to March2019
मजग की पनत ा म कमी मजग की पनत ा म कमी Demand not MetDemand not Met
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
Excludes the supply to Bangladesh
अपरल 2019 April2019 अपरल2018 -मािण2019 April2019 to April2019
उततरी कषतर Northern Region
चडीगढ़ Chandigarh(Data Not Received)दिलली Delhi
हरियजणज Haryana
दहमजचल परिश Himachal Pradeshरमम कशमीि Jammu amp Kashmir(Data
Not Received)परजब Punjab
िजरसथजन Rajasthanउतति परिश Uttar Pradesh
उततिजखड Uttarakhand
पशचिमी कषतर Western Region
छततीसगढ़ Chhattisgarh
Apr-Nov 2018- No cuts
Maximum Demand cut-58MW
Energy cut- 00020-00032 MUsday
गरिजत Gujarat
मधय परिश Madhya Pradesh
महजिजषटर Maharashtra
गोवज Goa
दकषकषणी कषतर Southern Region
आनधर परिश Andhra Pradesh
तलगजनज Telangana
कनजाटक Karnataka
किल Kerala
तममल नजड Tamil Nadu
पडचिी Puducherryपरवी कषतर Eastern Region
बबहजि Bihar
झजिखणड Jharkhand
ओडडशज Odisha
पशशचम बगजल West Bengal
No N
otifie
d Cu
ts
27
मािण 2019 म इडथरीर पर वरवदयत करौती का वरवरवरण Notified Power CutsRestrictions on Industries during April2019
राजय कषतर State Regionऊराणमाग करौती EnergyDemand Cut
No N
otifie
d Cu
tsNo
Notifie
d Cu
ts
अपरल2019 April 2019 अपरल2019 -अपरल2019 April2019 to April2019
उततरी कषतर Northern Region
चडीगढ़ Chandigarh Data not received Data not received
दिलली Delhi Data not received Data not received
हरियजणज Haryana 0811 hrsday 0811 hrsday
दहमजचल परिश Himachal Pradesh HPSEBL has only 2 agriculture consumers and uninterrupted
power is being supplied to agriculture sector
HPSEBL has only 2 agriculture consumers and uninterrupted
power is being supplied to agriculture sector
रमम कशमीि Jammu amp Kashmir Data not received Data not received
परजब Punjab 379 hrsday 379 hrsday
िजरसथजन Rajasthan 0630 hrsday 0630 hrsday
उतति परिश Uttar Pradesh 2157 hrsday 2157 hrsday
उततिजखड Uttarakhand 2359 hrsday 2359 hrsday
पशचिमी कषतर Western Region
छततीसगढ़ Chhattisgarh 18 hrsday 18 hrsday
गरिजत Gujarat 8 hrsday 8 hrsday
मधय परिश Madhya Pradesh Three-Phase Supply(Irrigation)- 0953 hrs day Three-Phase
(Mixed) Supply - 2334 hrs day
Three-Phase Supply(Irrigation)- 0953 hrs day Three-Phase
(Mixed) Supply - 2334 hrs day
महजिजषटर Maharashtra Three-Phase Supply(Irrigation)- 9 hrs day Three-Phase Supply(Irrigation)- 9 hrs day
गोवज Goa No restriction No restriction
दकषकषणी कषतर Southern Region
आनधर परिश Andhra Pradesh 07 hrsday 07 hrsday
तलगजनज Telangana 24 hrsday 24 hrsday
कनजाटक Karnataka 6 hrsday 6 hrsday
किल Kerala No Restrictions No Restrictions
तममल नजड Tamil Nadu 9 hrsday (6 hrs during day time and 3 hrs during night time) 9 hrsday (6 hrs during day time and 3 hrs during night time)
पडचिी Puducherry No Restrictions No Restrictions
परवी कषतर Eastern Region
बबहजि Bihar 18 hrsday 18 hrsday
झजिखणड Jharkhand 20 hrsday 20 hrsday
ओडडशज Odisha 24 hrsday 24 hrsday
पशशचम बगजल West Bengal 23 hrsday 23 hrsday
28
मारच 2019 कषि कषतर को षिदयत आपरतच का षििरण Power Supply to Agricultural Sector during March2019
राजय कषतर State Regionऔसत वरवदयत आपरत ण घनरो म Average Hours of Supply
On segregated feeders
SNo Contents Page
1 Growth of Installed Capacity since 6th Plan 29
2 Progress of Transmission Sector since 6th Plan 30
3 All India Yearly Coal consumption for Power Generation (Utilities)
4 All India Annual Per Capita Consumption of Electricity since -2006
5 Average cost of power supply amp Average realisation (Paisakwh)
6 Growth of Rural Electrification amp Pump Sets Energisation
7 Status of Hydro Schemes Cleared by the CEA in Apr-2019
Section G - Growth of Power Sector
31
32
(In MW)
Coal Gas Diesel Total
End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472
End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634
End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537
End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596
End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921
End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703
End of 12th Plan 19216288 2532938 83763 21832988 6780 4447842 50018 31960630
Up to Apr-2019 20070450 2493722 63763 22627934 678000 4539922 7764163 35610019
Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-17) = 51529 MW
Electricity Generation (MU) Targets and Achievements for 2016-17
Coal Gas Diesel Nuclear Hydro Res Total
2007045 2493722 637629 678000 453992 77641625 22925174
29
1 Growth of Installed Capacity Since 6th Plan
Plan YearThermal
Nuclear Hydro RES (MNRE) Total
2007045
2493722637629
678000
4539922
77641625
Total Installed Capacity 35610019 MW
Coal Gas Diesel Nuclear Hydro Res
Progress of Transmission Sector in the Country up to April 2019
1 TRANSMISSION LINES (All fig in CKM)
At the end of
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
6th plan 0 0 0 0 0 0 0 0 0 0 0 0 1831 4198 0 6029 1641 44364 0 46005 3472 48562 0 52034
7th plan 0 0 0 0 0 0 0 0 0 0 0 0 13068 6756 0 19824 4560 55071 0 59631 17628 61827 0 79455
8th plan 0 0 0 0 1634 0 0 1634 0 0 0 0 23001 13141 0 36142 6564 73036 0 79600 31199 86177 0 117376
9th plan 0 0 0 0 3234 1504 0 4738 751 409 0 1160 29345 20033 0 49378 8687 88306 0 96993 42017 110252 0 152269
10th plan 0 0 0 0 4368 1504 0 5872 1775 409 0 2184 48708 24730 0 73438 9444 105185 0 114629 64295 131828 0 196123
11th Plan 0 0 0 0 5948 1504 1980 9432 4839 411 0 5250 71023 30191 5605 106819 10140 125010 830 135980 91950 157116 8415 257481
12th Plan 6124 0 0 6124 5948 1504 1980 9432 25465 1177 4598 31240 92482 48240 17065 157787 11014 151276 978 163268 141033 202197 24621 367851
13th Plan (Up
to Mar2019)6124 0 0 6124 5948 1504 1980 9432 33692 1512 6605 41809 101335 58238 21173 180746 11734 162552 1010 175296 158833 223806 30768 413407
13th Plan (Up
to Apr-19)6124 0 0 6124 5948 1504 1980 9432 33745 1512 6605 41862 101335 58258 21173 180766 11734 162953 1010 175697 158886 224227 30768 413881
27150 600 MW of 132 kV Inter-Regional power transmission capacity links which are operated radially from time to time is not added in the total
75050
47900
24000
99050
30
Grand Total
Note - The figure upto the end of 10th plan in for stringing progress including the lines not commissioned Now only commissioned lines are reckoned Accordingly the figure for 10th plan (end) may read
as 187555 after adjusting with (-) 10852 Ckm
Inter-regional Power Transfer Capacity (MW)
plusmn 800 kV HVDC plusmn 500 kV HVDC 765 kV 400 kV 220 kV
IR addition in 12th
Plan (up to March
2017)
Inter-regional
Transmission
Capacity at the end
of Plan Period 2017-
22 (as on April19)
IR at the end of 11th
PlanIR at the end of 12th
Plan
IR Capacity Addition
at the end of Plan
Period 2017-22 (Till
April 19)
2004-05 27800
2005-06 28100
2006-07 30200
2007-08 33000
2008-09 35500
2009-10 36700
2010-11 38700
2011-12 41756
2012-13 45460
2013-14 48940
2014-15 53040
2015-16 54590
2016-17 57430
2017-18 60800
2018-19 62890
Year
2005-06
2006-07
2007-08
2008-09
2009-10
2010-11
2011-12
2012-13
2013-14
2014-15
2015-16
2016-17
2017-18
2018-19
2004-05 254 209 7568
2005-06 260 221 7636
2006-07 276 227 7423
2007-08 293 239 7727
2008-09 340 263 8713
2009-10 355 268 8870
2010-11 398 303 11975
2011-12 455 330 13514
2012-13 501 376 14867
2013-14 518 175
2014-15 520
Source- PFC Reports on the performance of State Power Utilities 31
1181
7335
7786
91441
8188
88363
957
1010
1075
1122
1149
(GrossGen+ Net Import) Mid-year population Provisional
5 Average cost of power supply amp average realization ( paiseKWH )
Yearcost of supply
(paiseunit)
Realization(paiseunit)
Including AgricultureOnly
Agriculture
6719
7171
3 All India yearly Coal Consumption for Power Generation (Utilities)
YEARCoal Consumption
Million Tonnes
4 All India Annual per Capita consumption of Electricity Since 2006
Per Capita Consumption ( kWh)
6314
Sl
NoExecuting Agency
Installed
Capacity (MW)Cost (Rs crore)
Date of
Clearance
32
Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as
Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received
from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made
available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified
villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is
independent of the earlier published reports
No Hydro Electric Project has been issued concurrenceAppraisal letter by CEA during April 2019
7 Status of Hydro Schemes Cleared by the CEA in Apr-2019
Name of Scheme
1999-002000-01
297594
010408 to 310309010409 to 310310
10th Plan
2005-062006-07
322968331020
6 Growth Of Rural Electrification amp Pumpsets Energisation
Plan Year
9th Plan2002-03
134092626
4111
Pump Sets Energised Villages Electricfied (Nos)
2001-02
284064367244
1218
27801997-981998-99
3207
482864
12632
1576036
4451722594
15455554
2314176
397343611750
2093311060316074
65109527813884
46708
18423975
499150
2003-042004-05
5743
9769
Cumu upto End of 10th Plan
010407 to 310308
010410 to 310311557976840909
010411 to 310312
412667
86293726
No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification
since 2004-05
65291374575 296361511th Plan
Cumu upto End of 11th Plan
596556 21212860
557439Cummulative up to end of 12th Plan
SN Contents Page
1 Rate of sale of power for the year 2016-17 33-41
RATE OF SALE OF POWER FOR THE YEAR 2016-17
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) NORTHERN REGION
CENTRAL SECTOR
BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 18000 66900 19800
CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 54000 222400 21600
CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 30000 144400 19600
CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 23100 91700 42600
PARBATI - III HPS NHPC LTD HYDRO-HYDRO 52000 68200 54800
DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 28000 95600 30000
CHUTAK NHPC LTD HYDRO-HYDRO 4400 22000 79800
DULHASTI HPS NHPC LTD HYDRO-HYDRO 39000 228000 56400
SALAL HPS NHPC LTD HYDRO-HYDRO 69000 342300 11000
TANAKPUR HPS NHPC LTD HYDRO-HYDRO 9420 43000 29600
URI HPS -I NHPC LTD HYDRO-HYDRO 48000 280300 16000
URI HPS - II NHPC LTD HYDRO-HYDRO 24000 147300 48600
NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 4500 24600 88200
SEWA - II NHPC LTD HYDRO-HYDRO 12000 47100 43400
ANTA CCPP NTPC LTD THERMAL-GASN 41930 67539 32400
AURAIYA CCPP NTPC LTD THERMAL-GASN 66336 53501 39100
BADARPUR TPS NTPC LTD THERMAL-COAL 70500 159153 44800
DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 84000 296170 42300
DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 98000 526686 46300
DADRI CCPP NTPC LTD THERMAL-GASHSD 82978 227469 33000
FARIDABAD CCPP NTPC LTD THERMAL-GASN 43159 115577 30800
RIHAND STPS I NTPC LTD THERMAL-COAL 100000 596766 24500
RIHAND STPS II NTPC LTD THERMAL-COAL 100000 737069 24600
RIHAND STPS III NTPC LTD THERMAL-COAL 100000 706546 30600
SINGRAULI STPS NTPC LTD THERMAL-COAL 200000 1394068 20400
TANDA TPS NTPC LTD THERMAL-COAL 44000 295438 40800
UNCHAHAR TPS I NTPC LTD THERMAL-COAL 42000 256454 39800
UNCHAHAR TPS II NTPC LTD THERMAL-COAL 42000 273577 38900
UNCHAHAR TPS III NTPC LTD THERMAL-COAL 21000 142780 43000
KOLDAM NTPC LTD HYDRO-HYDRO 80000 363260 43600
NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 303575 25841
RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 108000 668677 35374
NJHPS SJVNL HYDRO-HYDRO 150000 699496 23820
RAMPUR HPS SJVNL HYDRO-HYDRO 41202 195982 32260
TEHRI HPP THDC HYDRO-HYDRO 100000 272543 51800
KOTESHWAR HEP THDC HYDRO-HYDRO 40000 106244 53400
IGSTPS JHAJJAR ARAVALI P CPL THERMAL-COAL 150000 510429 49490
NEYVELI BARSINGSAR NEYVELI LIG CORP LTD THERMAL-LIG 25000 127520 38040
STATE SECTOR
PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 21000 14222 48200
PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 21000 19205 48400
PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 25000 102257 42600
PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 25000 62107 41800
DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 60000 312213 41000
RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 120000 35767442200
WYC HYDEL STATION HPGCL HYDRO-HYDRO 6240 20365 24900
GIRI POWER HOUSE HPSEB HYDRO-HYDRO 6000 13958 7600
ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 1695 5467 11900
BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 12000 18528 6700
GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 2250 7462 22500
BASSI POWER HOUSE HPSEB HYDRO-HYDRO 6600 29649 7500
BINWA POWER HOUSE HPSEB HYDRO-HYDRO 600 2749 19300
ANNEXURE-I
RATE OF SALE OF POWER FOR THE YEAR 2016-2017
Page 33
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) GAJ POWER HOUSE HPSEB HYDRO-HYDRO 1050 2914 26700
BANER POWER HOUSE HPSEB HYDRO-HYDRO 1200 2864 16200
HOLI POWER HOUSE HPSEB HYDRO-HYDRO 300 616 22500
THIROT POWER HOUSE HPSEB HYDRO-HYDRO 450 1126 22500
KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 1200 3064 22500
LARJI POWER HOUSE HPSEB HYDRO-HYDRO 12600 53677 23700
NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 250 750 31000
CHABA POWER HOUSE HPSEB HYDRO-HYDRO 175 465 23300
RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 150 101 13400
SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 200 000 22500
KILLAR HPSEB HYDRO-HYDRO 030 050 22500
BHABA AUGUMENP H HPSEB HYDRO-HYDRO 450 1276 22500
BS CHAMBA HPSEB HYDRO-HYDRO 045 099 19500
GUMMA HPSEB HYDRO-HYDRO 300 423 22500
GAS TURBINE POWER STATION IPGCL THERMAL-GAS 27000 67233 39300
PPS-I PPCL THERMAL-GAS 33000 175905 38300
PPS-III PPCL THERMAL-GAS 137120 196879 36100
LOWER JHELUM JampKPDD HYDRO-HYDRO 10500 60214 5100
UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 2260 10514 6300
UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 10500 44202 8500
GANDHARBAL JampKPDD HYDRO-HYDRO 1500 8925 4700
KARNAH MPH JampKPDD HYDRO-HYDRO 200 1122 31000
CHENANI I JampKPDD HYDRO-HYDRO 2330 10892 6600
CHENANI II JampKPDD HYDRO-HYDRO 200 1188 9300
CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 750 3634 14200
IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 375 2108 18500
IGO MERCHELLONG JampKPDD HYDRO-HYDRO 300 1572 29700
PAHALGAM MHP JampKPDD HYDRO-HYDRO 450 1713 32900
MARPACHOO JampKPDD HYDRO-HYDRO 075 375 29800
HAFTAL JampKPDD HYDRO-HYDRO 100 483 28700
SANJAK JampKPDD HYDRO-HYDRO 126 441 36000
SEWA-III JampKPDD HYDRO-HYDRO 900 3273 20200
BHADERWAH JampKPDD HYDRO-HYDRO 150 935 8900
BAZGO JampKPDD HYDRO-HYDRO 030 108 33300
SUMOOR JampKPDD HYDRO-HYDRO 010 045 35400
HUNDER JampKPDD HYDRO-HYDRO 040 176 26200
STAKNA JampKPDD HYDRO-HYDRO 400 1933 4100
KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 124000 662879 31360
SURATGARH TPS RRVUNL THERMAL-COAL 150000 402328 41730
CHHABRA TPS 1amp 2 RRVUNL THERMAL-COAL 50000 305946 36700
CHHABRA TPS 3 RRVUNL THERMAL-COAL 25000 151536 36700
CHHABRA TPS 4 RRVUNL THERMAL-COAL 25000 155896 36700
RAMGARH GT POWER PROJECT RRVUNL THERMAL-COAL 22050 43177 41800
RAMGARH GAS T P PROJECT 3 RRVUNL THERMAL-GAS 5000 93615 41800
DHOLPUR C C POWER PROJECT RRVUNL THERMAL-R-LNG 33000 9486 46110
MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 14000 20855 34192
MINI MICRO HYDEL (MMH) P S RRVUNL HYDRO-HYDRO 2385 851 37800
KALISINDH TPP 1 RRVUNL THERMAL-COAL 60000 341543 45000
KALISINDH TPP 2 RRVUNL THERMAL-COAL 60000 211588 45000
KHARA HEP UPJVNL HYDRO-HYDRO 7200 26654 7200
MATATILLA HEP UPJVNL HYDRO-HYDRO 3060 12219 6500
OBRA HEP UPJVNL HYDRO-HYDRO 9900 21517 6300
RIHAND UPJVNL HYDRO-HYDRO 30000 57369 5500
ANPARA A TPS UPRVUNL THERMAL-COAL 63000 317536 27000
ANPARA B TPS UPRVUNL THERMAL-COAL 100000 705605 22700
ANPARA D UPRVUNL THERMAL-COAL 100000 300158 39800
HARDUAGANJ TPS UPRVUNL THERMAL-COAL 16500 45817 49200
HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 50000 304389 46600
OBRA A TPS UPRVUNL THERMAL-COAL 28800 13158 34000
OBRA B TPS UPRVUNL THERMAL-COAL 100000 328124 21900
Page 34
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) PANKI TPS UPRVUNL THERMAL-COAL 21000 66488 50300
PARICHHA TPS UPRVUNL THERMAL-COAL 22000 38762 49400
PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 42000 231931 45600
PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 50000 276722 50400
CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 24000 70845 8290
CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 14400 75366 8390
DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 3375 9595 12080
DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 5100 18701 10520
KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4140 17359 12330
KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 12000 33001 9420
KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 3000 11953 8320
TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 9000 33983 12460
MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 30400 124510 16110
RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 19800 17897 10550
MPUR UTTARAKHAND JVNL HYDRO-HYDRO 930 5121 19200
PATHRI UTTARAKHAND JVNL HYDRO-HYDRO 2040 11636 14200
GALOGI UTTARAKHAND JVNL HYDRO-HYDRO 300 648 12500
PRIVATE SECTOR
MGTPP CLP INDIA PVT LTD THERMAL-COAL 132000 268902 41940
SHRINAGAR HEP ALAKNANDA HPCL HYDRO-HYDRO 33000 127414 48800
GAMA INFRAPROP CCPP GAMA INFRAPROP PVT THERMAL-GAS 22500 52686 47000
PPGCL (BARA) JP POWER VENTURES LTD THERMAL-COAL 198000 448200 38500
MALANA HEP MALANA PCL HYDRO-HYDRO 8600 26354 29792
MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 10000 30369 32580
ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 19200 56347 36079
KASHANG HEP H P PCL HYDRO-HYDRO 19500 5034 29200
BASPA-II HEP HBPCL HYDRO-HYDRO 30000 132769 13600
KARCHAM WANGTOO HEP HBPCL HYDRO-HYDRO 100000 434386 36600
RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 108000 582600 43700
RITHALA COMBI CY POWER PLANT TATA POWER DDL THERMAL-GAS 9480 000 11900
RAJPURA TPS NABHA POWER LTD THERMAL-GAS 140000 901484 39000
TALWANDI SABO POWER LTD TALWANDI SABO POWER LTD THERMAL-COAL 198000 636040 49548
ROJA THERMAL POWER STATION ROJA POWER SCL THERMAL-COAL 120000 727200 43400
KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 34400 63400
BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 36000 62600
MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 38200 60800
UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 37900 61500
KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 42300 58800
LALITPUR PGCL BAJAJ ENERGY PVT LTD THERMAL-COAL 198000 359400 47300
PRAYAGRAJ PGCL PRAYAGRAJ PGCL THERMAL-COAL 132000 448200 38595
KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 132000 783182 33438
WESTERN REGION
CENTRAL SECTOR
INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 100000 325333 23892
OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 52000 141663 34001
GANDHAR CCPP NTPC LTD THERMAL-GAS 65739 221924 28700
KAWAS CCPP NTPC LTD THERMAL-GASN 65620 167929 27000
KORBA I amp II NTPC LTD THERMAL-COAL 210000 1499171 20500
KORBA III NTPC LTD THERMAL-COAL 50000 358746 26600
SIPAT STPS I NTPC LTD THERMAL-COAL 198000 1479902 26800
SIPAT STPS II NTPC LTD THERMAL-COAL 100000 766549 26500
VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 126000 693142 25800
VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 100000 608781 23800
VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 100000 673475 27600
VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 100000 655924 32900
VINDHYACHAL STPS V NTPC LTD THERMAL-COAL 50000 328265 31700
MOUDA I NTPC LTD THERMAL-COAL 100000 343130 44500
MOUDA Ii NTPC LTD THERMAL-COAL 66000 40637 39900
RATNAGIRI GAS amp POWER PVT LTD RGPPL THERMAL-GAS 196708 442485 47000
KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 000 24729
TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 32000 201227 10740
Page 35
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 365122 19069
TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 787444 29324
STATE SECTOR
GSEG-HAZIRA15610 MW GUJARAT S ENEGEN LTD THERMAL-GAS 15610 1805 28200
GSEG-HAZIRA35143 MW GUJARAT S ENEGEN LTD THERMAL-GAS 35130 22276 51300
GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 21978 51800
AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 13929 26100
KORBA TPS EAST CSPGCL THERMAL-COAL 44000 198673 33880
DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 365808 27570
KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 316500 30420
HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 532878 19410
CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 515 58300
MTTPS CHAMPA U-I CSPGCL THERMAL-COAL 50000 220376 39000
MTTPS CHAMPA U-II CSPGCL THERMAL-COAL 50000 23709 10000
SHP GANGREL CSPGCL HYDRO-HYDRO 1000 2350 36790
BANGO HEP CSPGCL HYDRO-HYDRO 12000 14662 8900
MHP KORBA WEST CSPGCL HYDRO-HYDRO 170 859 38190
SIKASAR HEP CSPGCL HYDRO-HYDRO 700 418 26870
DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8843 74500
DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 19446 51500
GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 66388 71600
GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127488 41300
KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 96072 43900
KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 29841 56400
SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 184966 58800
UKAI 1-5 GSECL THERMAL-COAL 85000 204891 46900
UKAI TPS 6 GSECL THERMAL-COAL 50000 284448 48200
WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 271999 58300
WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 82808 44100
KADANA HPS GSECL HYDRO-HYDRO 24200 34433 16800
UKAI HPS GSECL HYDRO-HYDRO 30500 40585 6100
TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 123000 11500
BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 8900 10900
BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 7200 27500
JHINNA HPS MPPGCL HYDRO-HYDRO 2000 9700 18500
RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 44300 3400
GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 17300 4600
SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 4100 16900
MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 14600 27000
PENCH HPS MPPGCL HYDRO-HYDRO 16000 23700 8100
RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 3000 16900
AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 134400 35100
SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 283800 38700
SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 344600 34300
SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 111600 61600
SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 211800 58000
SSTPS PH-I MPPGCL THERMAL-COAL 120000 233100 84300
BHUSAWAL TPS MSPGCL THERMAL-COAL 142000 566258 51100
CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1365682 33700
KHAPERKHEDA MSPGCL THERMAL-COAL 134000 706207 39100
KORADI TPS MSPGCL THERMAL-COAL 62000 443206 42000
NASIK TPS MSPGCL THERMAL-COAL 63000 297275 47000
PARLI TPS MSPGCL THERMAL-COAL 113000 175934 71600
PARAS MSPGCL THERMAL-COAL 50000 267931 38700
URAN CCPP MSPGCL THERMAL-GAS 67200 320330 30600
KOYANA MSPGCL HYDRO-HYDRO 195600 328155 13100
SMALL HYDRO POWER PLANTS MSPGCL HYDRO-HYDRO 45400 93062 30500
BHIRA MSPGCL HYDRO-HYDRO 8000 10046 8400
TILLARI MSPGCL HYDRO-HYDRO 8900 10584 3100
SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 233298 20500
SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 87633 20500
PRIVATE SECTOR
Page 36
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 81282 46750
JNSTPP(JAYPEE NIGRIE) JP POWER VENTURES LTD THERMAL-COAL 132000 726695 29310
MB POWER MB POWER THERMAL-COAL 120000 345632 38310
ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 754922 28671
ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 780761 23495
ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 198000 1263784 32090
ADANI POWER MAHARA ADANI POWER LTD THERMAL-COAL 330000 1666191 34124
AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 170065 36827
SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 252035 45129
ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 458551 36000
ESSAR POWER MP LTD ESSAR POWER MP LTD THERMAL-COAL 60000 243040 28600
VEDANTA LTD (P P -I) VEDANTA LTD THERMAL-GAS 3000 15044 24000
VEDANTA LTD (P P -II) VEDANTA LTD THERMAL-GAS 3000 21293 24000
PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 8234600 24000
165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 5850 64390
145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 68717 40349
SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 132655 28776
SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 144686 38567
MUNDRA UMPPCOASTAL GUJARAT POWER
LTD THERMAL-IMP COAL 400000 2530300
23900
LANCO AMARKANTAK TPP PATHADIH
U-ILANCO AMARKAN POWER LTD THERMAL-COAL 30000 195500
29200
LANCO AMARKANTAK TPP PATHADIH
U-IILANCO AMARKAN POWER LTD THERMAL-COAL 30000 206900
27600
BARADARHA TPS D B POWER LTD THERMAL-COAL 120000 677373 29200
JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 405000 28900
JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 453000 40500
DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 339437 40700
TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 293400 44000
TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 137200 37000
TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 174900 44000
BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 92900 14100
BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23700 34300
KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 27600 48300
CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2530300 23900
BHANDARDRA HEP -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 2475 54900
SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 161400 26500
SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 445000 39000
SOTHERN REGION
CENTRAL SECTOR
NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 325699 54820
NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 305532 39880
NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 998805 38510
NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 113016 54070
NEYVELI TAMILNADU POWER LTD JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 625274 42200
VALLUR TPS NTPC TECL THERMAL-COAL 150000 856438 42350
R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 1493 84300
RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1502919 29400
RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 341291 31800
SIMHADRI I NTPC LTD THERMAL-COAL 100000 688382 36800
SIMHADRI II NTPC LTD THERMAL-COAL 100000 663657 43400
KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 593110 31324
MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 291625 21764
KKNPP-1 amp 2 NPCIL NUCLEAR-NUCLEAR 200000 572609 40948
MINICOY LAKSHADEEP THERMAL-DIESEL 340 770 29600
KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1097 29600
AMINI LAKSHADEEP THERMAL-DIESEL 265 509 29600
ANDROTT LAKSHADEEP THERMAL-DIESEL 219 524 29600
KALPENI LAKSHADEEP THERMAL-DIESEL 175 356 29600
AGATTI LAKSHADEEP THERMAL-DIESEL 195 658 29600
KADMAT LAKSHADEEP THERMAL-DIESEL 190 414 29600
KILTAN LAKSHADEEP THERMAL-DIESEL 150 269 29600
CHETLET LAKSHADEEP THERMAL-DIESEL 100 139 29600
BITRA LAKSHADEEP THERMAL-DIESEL 043 024 29600
BANGARAM LAKSHADEEP THERMAL-DIESEL 018 009 29600
Page 37
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) STATE SECTOR
Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 721811 46500
Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 50000 336142 46500
RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 237358 46500
RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 239926 46500
RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 124500 46500
SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 62109 46500
UPPER SILERU APGENCO HYDRO-HYDRO 24000 33000 46500
LOWER SILERU APGENCO HYDRO-HYDRO 46000 81066 46500
DONKARAI APGENCO HYDRO-HYDRO 2500 6007 46500
PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 1262 46500
CHETTIPETA APGENCO HYDRO-HYDRO 100 214 46500
MUCHKUND APGENCO HYDRO-HYDRO 12000 37571 46500
NAGARJUNASAGAR RCPH APGENCO HYDRO-HYDRO 9000 606 46500
TUNGABHADRA HES amp HAMPI(AP
Share)
APGENCO HYDRO-HYDRO 7200 6100 46500
KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 352232 42600
KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 288131 32500
KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 319272 46500
RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 40073 44300
KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 308317 46000
KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 308963 51300
SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 61004 76600
NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 17960 75300
PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 20873 58300
POCHAMPAD-I TSPGENCO HYDRO-HYDRO 2700 5455 29800
POCHAMPAD-II TSPGENCO HYDRO-HYDRO 900 1932 40700
NIZAMSAGAR TSPGENCO HYDRO-HYDRO 1000 1126 53400
RAICHUR TPS 1 to 7 KPCL THERMAL-COAL 147000 890866 43800
RAICHUR TPS 8 KPCL THERMAL-COAL 25000 159523 48200
BELLARI TPS 1 KPCL THERMAL-COAL 50000 318679 51100
BELLARI TPS 2 KPCL THERMAL-COAL 50000 232347 55600
BELLARI TPS 3 KPCL THERMAL-COAL 70000 47565 34400
BHADRA PH KPCL HYDRO-HYDRO 3920 2369 45900
GERUSUPPA PH KPCL HYDRO-HYDRO 24000 26990 22000
GHAT PRABHA HEP KPCL HYDRO-HYDRO 3200 4777 25300
KADRA HPS KPCL HYDRO-HYDRO 15000 16889 26800
NAGJHARI KPCL HYDRO-HYDRO 90000 155159 9800
KODASALLI DPH KPCL HYDRO-HYDRO 12000 14854 19200
MUNIRA+MGH+SPH+SPH KPCL HYDRO-HYDRO 22640 48211 7900
SHARAVATHY HPS KPCL HYDRO-HYDRO 108550 276215 5400
ALMATTI DPH KPCL HYDRO-HYDRO 29000 39611 24600
VARAHI UGPH KPCL HYDRO-HYDRO 46000 71368 15600
IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 17196 15300
IDUKKI HPS KSEB HYDRO-HYDRO 78000 137905 15300
KAKKAD HPS KSEB HYDRO-HYDRO 5000 13063 15300
KALLADA HPS KSEB HYDRO-HYDRO 1500 4436 15300
KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 46544 15300
KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 635 15300
LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 30822 15300
MALANKARA HPS KSEB HYDRO-HYDRO 1050 2474 15300
MATTUPETTY KSEB HYDRO-HYDRO 200 230 15300
MALAMPUZHA KSEB HYDRO-HYDRO 250 063 15300
CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 864 15300
URUMI ST I amp II KSEB HYDRO-HYDRO 615 903 15300
LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 248 15300
NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7765 19625 15300
PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 16601 15300
PANNIAR HPS KSEB HYDRO-HYDRO 3240 6217 15300
PORINGALKUTHU KSEB HYDRO-HYDRO 3600 10052 15300
PORINGALKUTHU LBE KSEB HYDRO-HYDRO 1600 9438 15300
PEPPARA KSEB HYDRO-HYDRO 300 395 15300
POOZHITHODE KSEB HYDRO-HYDRO 480 1045 15300
Page 38
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) PEECHI KSEB HYDRO-HYDRO 125 040 15300
RANI-PERUNADU KSEB HYDRO-HYDRO 400 585 15300
SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 79783 15300
SENGULAM HPS KSEB HYDRO-HYDRO 5120 11558 15300
SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 16711 15300
VILANGAD KSEB HYDRO-HYDRO 750 1578 15300
BARAPOLE KSEB HYDRO-HYDRO 1500 1932 15300
VELLATHOOVAL KSEB HYDRO-HYDRO 360 305 15300
CHIM0NY KSEB HYDRO-HYDRO 250 156 15300
ADYANPARA KSEB HYDRO-HYDRO 350 501 15300
BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 554 15300
KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 3801 15300
KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 23132 32800
ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 14416 62280
METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 523970 62280
METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 321270 62280
NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 336575 62280
NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 591240 62280
TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 508966 62280
KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 30897 62280
VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 18720 90699 62280
KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 33593 62280
BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 1047 62280
PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 1250 62280
PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 330 62280
MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 4897 62280
MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 032 62280
KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15681 62280
KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 40608 62280
KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 21342 62280
KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 4717 62280
KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4322 62280
KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2399 62280
METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 4416 62280
METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 8035 62280
BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2187 62280
BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2359 62280
BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2511 62280
BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 1949 62280
BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 1819 62280
POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 172 62280
SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 241 62280
MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 026 62280
THIRUMOORTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 136 62280
PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 9309 62280
VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 353 62280
SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 4192 62280
PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 6571 62280
SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 1186 62280
SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6319 62280
ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 6122 62280
KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 28674 62280
SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 18381 62280
SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 4258 62280
KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 12680 62280
KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4201 62280
ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 000 62280
PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 19175 62280
AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 078 62280
BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 504 62280
BHAVANI KATTALAI (BKB)(IIIampIII BB I amp II)TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 5847 62280
PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 000 62280
Page 39
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) SRI DAMODARAM STPS APPDCL THERMAL-COAL 160000 808108 36300
PRIVATE SECTOR
KARUPPUR TANJORE LANCO TANJORE PCL THERMAL-GAS 12000 48096 28770
SIMHAPURI ENERGY LTD SIMHAPURI ENERGY LTD THERMAL-COAL 60000 143900 39100
JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 7111 45500
SBU 1 JSW ENERGY LTD
VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 26000 159100
43300
SBU 2 JSW ENERGY LTD
VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 60000 247900
42800
LANCO KPLLANCO KONDAPALLI POWER
LTDTHERMAL-GAS 36814 85060
25776
LANCO KPL STG -IILANCO KONDAPALLI POWER
LTDTHERMAL-GAS 36600 12979
46330
LANCO KPL STG -IIIALANCO KONDAPALLI POWER
LTDTHERMAL-GAS 37100 85710
46330
LANCO KPL STG -III BLANCO KONDAPALLI POWER
LTDTHERMAL-GAS 37100 43639
46330
HINDUJA NATIONAL PCL HINDUJA NATIONAL PCL THERMAL-COAL 104000 303000 38200
MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 121164 49940
UDUPI POWER COR LTD ADANI POWER LTD THERMAL-COAL 120000 754613 42500
SPECTRUM POWER GENERATION
LTD SPECTRUM PG LTD THERMAL-GASN 20525 9256812
34952
TAQA NEYVELI POWER COM PVT
LTD TAQA NEYVELI THERMAL-LIG 25000 5840
34500
ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 251000 51000
ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 207860 36800
GMR VEMAGIRI POWER GENERATION
LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 30117
46450
EASTERN REGION
CENTRAL SECTOR
MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 64675 53113
MTPS STAGE - II KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 39000 1432 69138
BOKARO `B` TPS DVC THERMAL-COAL 63000 145670 31539
MEJIA TPS U 1-3 DVC THERMAL-COAL 63000 348298 31552
MEJIA TPS U 4 DVC THERMAL-COAL 21000 116099 34997
MEJIA TPS U 5-6 DVC THERMAL-COAL 50000 276427 35976
MEJIA TPS U 7-8 DVC THERMAL-COAL 100000 552854 36991
DURGAPUR STEEL TPS DVC THERMAL-COAL 100000 665550 39323
DURGAPUR TPS DVC THERMAL-COAL 21000 59270 35416
RAGHUNATHPUR TPS DVC THERMAL-COAL 120000 201650 35326
MAITHON HYDEL STA DVC HYDRO-HYDRO 6320 12200 17984
CHANDRAPURA TPSU1-3 DVC THERMAL-COAL 42000 257610 35095
CHANDRAPURA TPSU7-8 DVC THERMAL-COAL 50000 306673 34987
KODERMA TPS DVC THERMAL-COAL 100000 380180 38131
PANCHET HPS DVC HYDRO-HYDRO 8000 13360 17984
TILLAYA HPS DVC HYDRO-HYDRO 400 1410 17984
RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34700 35400
TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 277300 23200
TLDP -III NHPC LTD HYDRO-HYDRO 13200 55400 62000
TLDP -IV NHPC LTD HYDRO-HYDRO 16000 60300 25600
FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 957219 33700
FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 308943 41000
BONGAINGAON TPS NTPC LTD THERMAL-COAL 25000 153663 58600
KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 542277 34200
KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 942591 34200
BARH-II NTPC LTD THERMAL-COAL 132000 728021 44500
TALCHER TPS NTPC LTD THERMAL-COAL 46000 335521 30100
TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 702319 25600
TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1436521 24700
STATE SECTOR
BTPS(RampM) BIHAR STATE PGCL THERMAL-COAL 22000 12142 39700
BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 98331 10602
HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 50593 9482
CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 19689 2605
RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 53192 6033
UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 147208 14637
Page 40
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 60353 4519
IB TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 288567 25000
J P H GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 210 038 61100
MEYONG CHU GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 400 1086 61100
TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 122667 38200
DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 214339 43321
KOLAGHAT THERMAL POWER
STATION
WEST BENGAL PDCL THERMAL-COAL 126000 538269 31603
BAKRESHWAR THERMAL POWER
PLANT
WEST BENGAL PDCL THERMAL-COAL 105000 634876 32154
BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 45000 166855 33299
SANTHALDIH THERMAL POWER
STATION
WEST BENGAL PDCL THERMAL-COAL 50000 336442 34932
SAGARDIGHI THERMAL POWER
PROJECT
WEST BENGAL PDCL THERMAL-COAL 160000 423121 34705
JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 20344 68900
RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 24559 68900
TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 4623 68900
PURULIA PUMPED STORAGE
PROJECT
WEST BENGAL SEDCL HYDRO-HYDRO 90000 108816 68900
MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2768 68900
PRIVATE SECTOR
CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 49474 20230
CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 555500 70200
HALDIA ENERGY HALDIA ENERGY LTD THERMAL-COAL 60000 371000 50400
DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3688 63400
KAMALANGA TPS GMR KAMALANGA ENERGY LTD THERMAL-COAL 105000547670
33300
ADHUNIK POWER U-1 ADHUNIK POWER THERMAL-COAL 27000 158 44060
ADHUNIK POWER U-2 ADHUNIK POWER THERMAL-COAL 27000 168 44250
VL-JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 332800 23622
JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 43000 45250
JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 71700 37030
JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 70700 35920
JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 71100 38870
JOJOBERA UNIT 5 TATA POWER COM LTD THERMAL-COAL 12000 79300 44560
JOJOBERA UNIT 6 TATA POWER COM LTD THERMAL-WHR 12000 83700 12840
IEL KALINGANAGAR U-I TATA POWER COM LTD THERMAL-WG 6750 33400 22500
IEL KALINGANAGAR U-II TATA POWER COM LTD THERMAL-WG 6750 34800 22500
MAITHON UNIT 1 amp 2 TATA POWER COM LTD THERMAL-COAL 105000 678000 36100
HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 27500 24340
HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 28400 24340
HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 15800 24310
NORTH EASTERN REGION
CENTRAL SECTOR
LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 74100 36600
AGARTALA GT NEEPCO THERMAL-GAS 13500 88611 27210
ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 153111 32310
DOYANG HEP NEEPCO HYDRO-HYDRO 7500 25598 49801
KOPILI HEP NEEPCO HYDRO-HYDRO 20000 98186 11491
KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 19582 20237
KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 10310 17968
RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 124093 22945
TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 10100 17344 39000
STATE SECTOR
HYDRO POWER (122 Stns) ITANAGAR GOVT OF ARUNACHAL
PRADESHHYDRO-HYDRO 6971 6217270
24600
KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39514 17337
LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 82327 36810
NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 33318 48290
MYNTRIANG SHEP ST II ASSAM POWER GENCO HYDRO-HYDRO 300 567 35776
LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 9130 49200
LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 012 49200
DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 022 49200
TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 000 49200
UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 4990 16000
UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 6476 37000
UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 16494 14600
UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 3600 9556 15000
SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 758 8000
MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44070 44800
KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 154 41400
TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 091 41400
MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 411 41400
MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 394 41400
KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 760 41400
SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 3264 41400
LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 044 41400
BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 18953 28000
ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 43585 28200
GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 4080 11100
Note
LIG Lignite N Naptha WHR Waste Heat Recovery
Page 41
Chandigarh Delhi Haryana HP JampK Punjab Rajasthan UP Utrakhand Apr-2018 0 0 0 0 546 0 0 247 0
Apr-2019 0 0 0 0 565 0 0 0 0
Chattisgarh Gujarat MP Maharashtra Daman amp Diu Dadar Nagar Goa
Apr-2018 13 11 3 99 0 0 0
Apr-2019 22 6 0 8 1 0 0
AP Telangana Karnataka Kerala Tamil Nadu Puducherry Lakshadweep
Apr-2018 22 0 2 0 0 20 0
Apr-2019 0 0 0 8 0 2 0
8
9 Peak Shortage of Power Supply (MW) in Different Regions in Apr-2019
0 0 0 0
565
0 0 0 00 0 0 0
546
0 0
247
0
0
400
800
Ch
an
dig
ar
h Delh
i
Ha
rya
na
HP
Jamp
K
Pu
nja
b
Ra
jasth
an
UP
Utr
akhan
d
MW
Northern States (MW) Apr-2019 Apr-2018
22
6 0 8 1 0 0
13
11
3
99
0 0 0
0
50
100
150
Ch
attis
gar
h
Guja
rat
MP
Mah
ara
shtr
a
Da
man amp
Diu
Da
dar
Na
gar G
oa
MW
Western States (MW) Apr-2019 Apr-2018
0 0 08
0 2 0
22
0 2 0 0
20
00
50
AP Telangana Karnataka Kerala Tamil Nadu Puducherry Lakshadweep
Southern State (MW) Apr-2019 Apr-2018
Bihar DVC Jharkhand Odisha West Bengal Sikkim AampN Island
Apr-2018 0 39 0 0 7 0 4
Apr-2019 0 0 0 0 0 0 4
Arunachal Assam Manipur Meghalaya Mizoram Nagaland Tripura
Apr-2018 5 30 7 0 9 29 4
Apr-2019 3 45 9 0 3 26 1
9
0 0 0 0 0 0
4
0
39
0 0
7
0
4
01020304050
Bih
ar
DV
C
Jha
rkh
an
d
Od
ish
a
We
st
Be
ng
al
Sik
kim
Aamp
NIs
land
MW
Eastern States (MW) Apr-2019 Apr-2018
3
45
9
0 3
26
1
5 7
0
9
29
4
0
10
20
30
40
50
Aru
na
cha
l
Assa
m
Ma
nip
ur
Me
gh
ala
ya
Miz
ora
m
Na
gala
nd
Trip
ura
MW
North-Eastern States (MW)
Sector Apr-2018 Apr-2019
Central 7634 7459
State 6438 6142
Private Sector IPP 5525 6005
Private Sector UTL 6815 6440
ALL INDIA 6454 6471
Month PLF 2018 PLF 2019
Jan 6215 6054
Feb 6230 6051
March 6452 6340
April 6454 6471
For Coal and Lignite based Power Plants and Provisional based on Actual-Cum-Assesment
10
PLF of Thermal Power Plants
(excluding gas based power plants)
All India PLF of Thermal Plants (Excluding Gas Based Plants) Month-wise
10 All India Thermal PLF Sector-wise (Excluding Gas Based Power Plants) for Apr-2019
5800
6000
6200
6400
6600
Jan Feb March April
Months
All India PLF Month-wise
PLF 2018 PLF 2019
7634
64385525
6815 6454
7459
6142 60056440 6471
000
2000
4000
6000
8000
10000
Central State Private Sector IPP Private Sector UTL ALL INDIA
All India Thermal PLF
Apr-2018 Apr-2019
2012-13 2013-14 2014-15 2015-16 2016-17 2017-18
TampD Losses 2304 2284 2277 2181 2142 2104
ATampC Losses 2548 2262 2572 2398 NA NA
Provisional
Note As per PFC for utilities selling directly to consumers NA- Not Available
Total Number of Villages
597464
Note From the year 2004-05 onwards Definition of Village Electrification-
A village would be declared Electrified if
Without
Subsidy
Gap ACS-
ARR(
Without
Subsidy)
Paiseunit
Gap ACS-
ARR (on
subsidy
booked
basis)
paiseunit
Gap ACS-
ARR (on
subsidyrece
ived basis)
paiseunit
2013-14 400 118 76 77
2014-15 412 108 58 60
Source- PFC Reports on the performance of State Power Utilities
2013-14 4894
2014-15 5304
2015-16 5459
2016-17 5743
2017-18 6080
2018-19 6289
11
11 T amp D and ATampC Losses ()
12 All India Village Electrification
Villiages Electrified (Nos)
10000All villages as per census 2011 has
been electrified on 28042018
Villages electrified
Average cost of supply(ACS)
(paiseunit)
i) Basic Infrastructure such as Distribution Transformer and Distribution lines are provided in the inhabited locality
as well as Dalit Basti hemlet where it exists (For electrification through Non-Conventional Energy Sources a
Distribution Transformer may not be necessary)
14 All India Coal consumption for Power Generation (MT)
520
Average Revenue Realization(paiseunit)
518
Year
ii) Electricity is provided to Public places like Schools Panchayat Office Health Centre Dispensaries Community
Centres etc and
iv) Mandatory Certification from Gram Panchayat regarding the completion of village electrification should be
obtained
13 Average cost of Power amp Average Realisation
iii) The number of households electrified should be at least 10 of the total number of households in the village
SN Contents Page
1 Capacity Addition Targets and Achievements in 12th Plan amp upto March2019 12
2 Capacity Addition Targets amp Achievements during Apr-2019 and Apr-19 to Apr-19 13
3 Installed Capacity in various Regions including their shares 14-19
Section B - Capacity Addition
(i) CAPACITY ADDTION TARGETS AND ACHIEVEMENTS IN THE 12TH PLAN Figures in MW
TARGET ACH TARGET ACH TARGET ACH TARGET ACH
CENTRAL 14878 15869 6004 2584 5300 2000 26182 20453
STATE 13922 22201 1608 2276 0 0 15530 24477
PRIVATE 43540 53661 3285 619 0 0 46825 54280
ALL INDIA 72340 91730 10897 5479 5300 2000 88537 99209
(ii) CAPACITY ADDITION TARGET AND ACHIEVEMENT FOR 2017-18 (IN MW)
THERMAL HYDRO NUCLEAR
TARGET ACH TARGET ACH TARGET ACH TARGET ACH
CENTRAL 4880 3170 800 390 500 6180 3560
STATE 3546 1760 300 200 0 3846 1960
PRIVATE 2940 3780 205 205 0 3145 3985
ALL INDIA 11366 8710 1305 795 500 0 13171 9505
(iii) CAPACITY ADDITION ACHIEVEMENT FOR 2018-19 (IN MW)
TARGET ACH TARGET ACH TARGET ACH TARGET ACH
CENTRAL 2760 1960 710 110 0 0 3470 2070
STATE 4506 2850 130 30 0 0 4636 2880
PRIVATE 0 972 0 0 0 0 0 972
ALL INDIA 7266 5782 840 140 0 0 8106 5922
12
SECTOR
SECTOR
TOTAL
TOTALNUCLEARHYDROTHERMAL
1 Capacity Addtion Targets and Achievements in the 12th Plan amp upto March2019
SECTORTHERMAL HYDRO NUCLEAR TOTAL
(MW)
Cummulative
Deviation
Target Achievement Target Achievement (+) (-)
Central 6040 500 0 500 0 -500
State 425615 660 0 660 0 -660
Private 0 0 0 0 0 0
Total 1029615 1160 0 1160 0 -1160
Central 600 0 0 0 0 0
State 21099 0 0 0 0 0
Private 379 0 0 0 0 0
Total 118999 0 0 0 0 0
Nuclear Central 700 0 0 0 0 0
Central 7340 500 0 500 0 -500
State 446714 660 0 660 0 -660
Private 379 0 0 0 0 0
Total 1218614 1160 0 1160 0 -1160
Electricity Generation (MU) Targets and Achievements for 2016-17
13
Hydro
All India
Capacity Addition TargetsAchievements during the Month of Apr-2019
Thermal
2 Capacity Addition Targets Achievements During Apr-2019
Schemes Sector
Target 2019-20
Apr-19 to Apr-19Apr-19
11
60
0 0
11
60
0 0 0 0
0
200
400
600
800
1000
1200
1400
Thermal Hydro Nuclear Total
MW
Targets and Achievement during 2019-20Target Achievement
0
200
400
600
800
1000
1200
Thermal Hydro Nuclear Total
1160
0 0
1160
0 0 00
MW
Target Achievement
Coal Lignite Gas Diesel Total
State 1634400 25000 287920 000 1947320 000 869755 69956 2887031
Private 2168083 108000 55800 000 2331883 000 251400 1312046 3895329
Central 1233537 25000 234406 000 1492943 162000 849622 37900 2542465
Sub Total 5036020 158000 578126 000 5772146 162000 1970777 1419902 9324825
State 2156000 104000 284982 000 2544982 000 544650 54789 3144421
Private 3474567 50000 467600 000 3992167 000 48100 2186476 6226743
Central 1650295 000 328067 000 1978362 184000 162000 66630 2390992
Sub Total 7280862 154000 1080649 000 8515511 184000 754750 2307894 11762155
State 1993250 000 79198 28788 2101236 000 1177483 58688 3337407
Private 1187450 25000 532210 27370 1772030 000 000 3749140 5521170
Central 1123502 289000 35958 000 1448460 332000 000 54190 1834650
Sub Total 4304202 314000 647366 56158 5321726 332000 1177483 3862018 10693227
State 624000 000 10000 000 634000 000 353792 27511 1015303
Private 638700 000 000 000 638700 000 39900 111637 790237
Central 1483664 000 000 000 1483664 000 100520 1000 1585184
Sub Total 2746364 000 10000 000 2756364 000 494212 140148 3390724
State 000 000 49771 3600 53371 000 42200 23325 118895
Private 000 000 2450 000 2450 000 000 6104 8554
Central 77002 000 125360 000 202362 000 100500 3000 305862
Sub Total 77002 000 177581 3600 258183 000 142700 32429 433311
State 000 000 000 4005 4005 000 000 525 4530
Private 000 000 000 000 000 000 000 738 738
Central 000 000 000 000 000 000 000 510 510
Sub Total 000 000 000 4005 4005 000 000 1773 5778
State 6407650 129000 711871 36393 7284913 000 2987880 234793 10507586
Private 7468800 183000 1058060 27370 8737230 000 339400 7366140 16442770
Central 5568000 314000 723791 000 6605791 678000 1212642 163230 8659663
Total 19444450 626000 2493722 63763 22627934 678000 4539922 7764163 35610019
Figures at decimal may not tally due to rounding off
Note -
(As per latest information available with MNRE)
Break up of RES all India as on 31032019 is given below (in MW)
459315 3562597 2818071 7764163
A 0 MW
B Apr 2019 0 MW
C
Apr 2019 0 MW
D Net Capacity Added during Apr 2019 A-B-C 0 MW
Sector wise breakup of RES capacity as shown is provisional
Share of installed capacity of BBMB Stations is included in state sector of partner states
BM PowerCogen Waste to Energy
910350 13830
Capacity Added during Apr 2019
Capacity Retired during
Capacity removed due to change
from Conventional to RES during
Islands
ALL INDIA
Abbreviation- SHP=Small Hydro Project (le 25 MW) BP=Biomass Power UampI=Urban amp Industrial Waste Power RES=Renewable Energy Sources
1 RES include SHP BP UampI Solar and Wind Energy Installed capacity in respect of RES (MNRE) as on 31032019
Small
Hydro PowerWind Power
Bio-PowerSolar Power
Total
Capacity
RES
(MNRE)
Northern Region
Western Region
Southern Region
Eastern Region
North Eastern
Region
ALL INDIA INSTALLED CAPACITY (IN MW) OF POWER STATIONS
(As on 30042019)
(UTILITIES)
Region Ownership Sector
Mode wise breakup
Grand TotalThermalNuclear Hydro
Coal Lignite Gas Diesel Total
State 13500 000 180040 000 193540 000 000 000 193540
Private 86922 000 10800 000 97722 000 000 17889 115611
Central 311272 000 20701 000 331973 10283 72309 000 414565
Sub-Total 411694 000 211541 000 623235 10283 72309 17889 723716
State 272000 000 15000 000 287000 000 110282 6930 404212
Private 408078 000 000 000 408078 000 20000 34512 462590
Central 129472 000 53561 000 183034 10094 66370181 500 259998
Sub-Total 809550 000 68561 000 878112 10094 196652 41942 1126799
State 000 000 000 000 000 000 69460 25661 95121
Private 000 000 000 000 000 000 99200 62668 161868
Central 18340 000 6201 000 24541 2895 122388 000 149824
Sub-Total 18340 000 6201 000 24541 2895 291048 88329 406813
State 000 000 17500 000 17500 000 123000 12903 153403
Private 000 000 000 000 000 000 000 6483 6483
Central 50639 000 12907 000 63547 6798 109188 000 179533
Sub-Total 50639 000 30407 000 81047 6798 232188 19386 339419
State 176000 000 15000 000 191000 000 259770 12780 463550
Private 511550 000 000 000 511550 000 28800 115462 655812
Central 85458 000 26401 000 111859 19681 92342 000 223882
Sub-Total 773008 000 41401 000 814409 19681 380912 128242 1343244
State 626000 25000 60380 000 711380 000 109618 2385 823383
Private 280200 108000 000 000 388200 000 10400 730181 1128781
Central 95625 25000 22110 000 142735 55674 73901 34400 306710
Sub-Total 1001825 158000 82490 000 1242315 55674 193919 766966 2258874
State 546900 000 000 000 546900 000 72410 2510 621820
Private 871433 000 000 000 871433 000 84200 288760 1244393
Central 379639 000 54949 000 434588 28948 180253 3000 646789
Sub-Total 1797972 000 54949 000 1852921 28948 336863 294270 2513002
State 000 000 000 000 000 000 125215 6787 132002
Private 9900 000 45000 000 54900 000 8800 52620 116320
Central 34324 000 6966 000 41290 3124 47554 000 91968
Sub-Total 44224 000 51966 000 96190 3124 181569 59407 340290
State 000 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 000 3471 3471
Central 3815 000 1503 000 5317 801 10171 000 16289
Sub-Total 3815 000 1503 000 5317 801 10171 3471 19760
124953 000 29105 000 154058 23703 75145 000 252907
State 1634400 25000 287920 000 1947320 000 869755 69956 2887031
Private 2168083 108000 55800 000 2331883 000 251400 1312046 3895329
Central 1233537 25000 234406 000 1492943 162000 849622 37900 2542465
Grand Total 5036020 158000 578126 000 5772146 162000 1970777 1419902 9324825
Delhi
Haryana
Himachal Pradesh
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
NORTHERN REGION
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
(As on 30042019)
State Ownership Sector
Mode wise breakup
Grand TotalThermalNuclear Hydro
RES
(MNRE)
Jammu amp Kashmir
Punjab
Rajasthan
Uttar Pradesh
Uttarakhand
Chandigarh
Central - Unallocated
Total (Northern
Region)
(As on 30042019)
Coal Lignite Gas Diesel Total
State 000 000 000 000 000 000 000 005 005
Private 000 000 4800 000 4800 000 000 392 5192
Central 46959 000 1967 000 48926 2600 000 000 51526
Sub-Total 46959 000 6767 000 53726 2600 000 397 56723
State 000 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 000 1447 1447
Central 14141 000 4334 000 18475 700 000 000 19175
Sub-Total 14141 000 4334 000 18475 700 000 1447 20622
State 371000 104000 217782 000 692782 000 77200 6470 776452
Private 726567 50000 396000 000 1172567 000 000 833180 2005747
Central 324243 000 42400 000 366643 55900 000 24330 446873
Sub-Total 1421810 154000 656182 000 2231992 55900 77200 863980 3229072
State 540000 000 000 000 540000 000 170366 8396 718762
Private 617400 000 10000 000 627400 000 000 418040 1045440
Central 334238 000 25700 000 359938 27300 152000 30000 569238
Sub-Total 1491638 000 35700 000 1527338 27300 322366 456436 2333440
State 228000 000 000 000 228000 000 12000 1105 241105
Private 885000 000 000 000 885000 000 000 52430 937430
Central 211075 000 000 000 211075 4800 10000 000 225875
Sub-Total 1324075 000 000 000 1324075 4800 22000 53535 1404410
State 1017000 000 67200 000 1084200 000 285084 38813 1408097
Private 1245600 000 56800 000 1302400 000 48100 880441 2230941
Central 466780 000 227273 000 694053 69000 000 12300 775353
Sub-Total 2729380 000 351273 000 3080653 69000 333184 931553 4414390
State 000 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 000 546 546
Central 19560 000 6634 000 26194 900 000 000 27094
Sub-Total 19560 000 6634 000 26194 900 000 546 27640
233300 000 19759 000 253059 22800 000 000 275859
State 2156000 104000 284982 000 2544982 000 544650 54789 3144421
Private 3474567 50000 467600 000 3992167 000 48100 2186476 6226743
Central 1650295 000 328067 000 1978362 184000 162000 66630 2390992
Grand Total 7280862 154000 1080649 000 8515511 184000 754750 2307894 11762155
Goa
Daman amp Diu
Gujarat
Madhya Pradesh
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
WESTERN REGION
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
ThermalNuclear Hydro
RES
(MNRE)
State Ownership Sector
Mode wise breakup
Grand Total
Chhattisgarh
Maharashtra
Dadra amp Nagar
Naveli
Central - Unallocated
Total (Western
Region)
(As on 30042019)
Coal Lignite Gas Diesel Total
State 501000 000 23540 000 524540 000 167360 5618 697518
Private 387388 000 381318 3680 772386 000 000 743342 1515728
Central 154683 12773 000 000 167456 12727 000 25000 205183
Sub-Total 1043071 12773 404858 3680 1464382 12727 167360 773960 2418429
State 558250 000 000 000 558250 000 247993 4122 810365
Private 83945 000 83182 000 167127 000 000 393644 560771
Central 180685 14927 000 000 195612 14873 000 1000 211485
Sub-Total 822880 14927 83182 000 920989 14873 247993 398766 1582621
State 502000 000 000 12792 514792 000 358660 19389 892841
Private 195850 000 000 2520 198370 000 000 1363591 1561961
Central 242780 40140 000 000 282920 69800 000 000 352720
Sub-Total 940630 40140 000 15312 996082 69800 358660 1382979 2807521
State 000 000 000 15996 15996 000 185650 17290 218936
Private 61500 000 17400 000 78900 000 000 19021 97921
Central 86142 28180 35958 000 150280 36200 000 5000 191480
Sub-Total 147642 28180 53358 15996 245176 36200 185650 41311 508337
State 432000 000 52408 000 484408 000 217820 12270 714498
Private 458767 25000 50310 21170 555247 000 000 1229228 1784475
Central 302532 136420 000 000 438952 144800 000 23190 606942
Sub-Total 1193299 161420 102718 21170 1478607 144800 217820 1264688 3105915
State 000 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 000 000 000
Central 000 10000 000 000 10000 000 000 000 10000
Sub-Total 000 10000 000 000 10000 000 000 000 10000
State 000 000 3250 000 3250 000 000 000 3250
Private 000 000 000 000 000 000 000 314 314
Central 14080 10760 000 000 24840 8600 000 000 33440
Sub-Total 14080 10760 3250 000 28090 8600 000 314 37004
142600 35800 000 000 178400 45000 000 000 223400
State 1993250 000 79198 28788 2101236 000 1177483 58688 3337407
Private 1187450 25000 532210 27370 1772030 000 000 3749140 5521170
Central 1123502 289000 35958 000 1448460 332000 000 54190 1834650
Grand Total 4304202 314000 647366 56158 5321726 332000 1177483 3862018 10693227
Kerala
Andhra Pradesh
Telangana
Karnataka
Total (Southern
Region)
Tamil Nadu
NLC
Puducherry
Central - Unallocated
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
SOUTHERN REGION
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
State Ownership Sector
Mode wise breakup
Grand TotalThermalNuclear Hydro
RES
(MNRE)
(As on 30042019)
Coal Lignite Gas Diesel Total
State 000 000 000 000 000 000 000 7070 7070
Private 28100 000 000 000 28100 000 000 25545 53645
Central 384933 000 000 000 384933 000 11000 000 395932
Sub-Total 413033 000 000 000 413033 000 11000 32615 456647
State 42000 000 000 000 42000 000 13000 405 55405
Private 73000 000 000 000 73000 000 000 3495 76495
Central 39374 000 000 000 39374 000 6100 000 45474
Sub-Total 154374 000 000 000 154374 000 19100 3900 177374
State 540000 000 10000 000 550000 000 98600 12195 660795
Private 243700 000 000 000 243700 000 000 35250 278950
Central 76077 000 000 000 76077 000 41000 000 117077
Sub-Total 859777 000 10000 000 869777 000 139600 47445 1056822
State 000 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 000 000 000
Central 698504 000 000 000 698504 000 18620 000 717124
Sub-Total 698504 000 000 000 698504 000 18620 000 717124
State 42000 000 000 000 42000 000 206192 2630 250822
Private 293900 000 000 000 293900 000 000 47346 341246
Central 163390 000 000 000 163390 000 8900 1000 173290
Sub-Total 499290 000 000 000 499290 000 215092 50976 765358
State 000 000 000 000 000 000 36000 5211 41211
Private 000 000 000 000 000 000 39900 001 39901
Central 8703 000 000 000 8703 000 6400 000 15103
Sub-Total 8703 000 000 000 8703 000 82300 5212 96215
112683 000 000 000 112683 000 8501 000 121184
State 624000 000 10000 000 634000 000 353792 27511 1015303
Private 638700 000 000 000 638700 000 39900 111637 790237
Central 1483664 000 000 000 1483664 000 100520 1000 1585184
Grand Total 2746364 000 10000 000 2756364 000 494212 140148 3390724
Total (Eastern
Region)
Bihar
Jharkhand
West Bengal
DVC
Odisha
Sikkim
Central - Unallocated
HydroOwnership Sector
Mode wise breakup
Grand TotalThermalNuclear
RES
(MNRE)
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
State
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
EASTERN REGION
(As on 30042019)
Coal Lignite Gas Diesel Total
State 000 000 32821 000 32821 000 10000 501 43322
Private 000 000 2450 000 2450 000 000 2650 5100
Central 40852 000 43556 000 84408 000 35708 2500 122616
Sub-Total 40852 000 78827 000 119679 000 45708 5651 171038
State 000 000 000 000 000 000 000 10711 10711
Private 000 000 000 000 000 000 000 2939 2939
Central 3705 000 4682 000 8387 000 11655 000 20042
Sub-Total 3705 000 4682 000 8387 000 11655 13650 33692
State 000 000 000 000 000 000 32200 3253 35453
Private 000 000 000 000 000 000 000 012 012
Central 4560 000 10969 000 15529 000 7227 000 22756
Sub-Total 4560 000 10969 000 15529 000 39427 3265 58221
State 000 000 16950 000 16950 000 000 1601 18551
Private 000 000 000 000 000 000 000 009 009
Central 5610 000 43695 000 49305 000 6849 500 56654
Sub-Total 5610 000 60645 000 66255 000 6849 2110 75214
State 000 000 000 3600 3600 000 000 545 4145
Private 000 000 000 000 000 000 000 344 344
Central 4710 000 7157 000 11867 000 9534 000 21401
Sub-Total 4710 000 7157 3600 15467 000 9534 889 25890
State 000 000 000 000 000 000 000 3067 3067
Private 000 000 000 000 000 000 000 100 100
Central 3210 000 4893 000 8103 000 5733 000 13836
Sub-Total 3210 000 4893 000 8103 000 5733 3167 17003
State 000 000 000 000 000 000 000 3647 3647
Private 000 000 000 000 000 000 000 050 050
Central 3105 000 4046 000 7151 000 9794 000 16945
Sub-Total 3105 000 4046 000 7151 000 9794 3697 20642
11250 000 6362 000 17612 000 14000 000 31612
State 000 000 49771 3600 53371 000 42200 23325 118895
Private 000 000 2450 000 2450 000 000 6104 8554
Central 77002 000 125360 000 202362 000 100500 3000 305862
Grand Total 77002 000 177581 3600 258183 000 142700 32429 433311
Assam
Arunachal Pradesh
Meghalaya
Tripura
Manipur
Nagaland
Mizoram
Central - Unallocated
Total (North-
Eastern Region)
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
NORTH-EASTERN REGION
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
State Ownership Sector
Mode wise breakup
Grand TotalThermalNuclear Hydro
RES
(MNRE)
(As on 30042019)
Coal Lignite Gas Diesel Total
State 000 000 000 4005 4005 000 000 525 4530
Private 000 000 000 000 000 000 000 663 663
Central 000 000 000 000 000 000 000 510 510
Sub-Total 000 000 000 4005 4005 000 000 1698 5703
State 000 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 000 075 075
Central 000 000 000 000 000 000 000 000 000
Sub-Total 000 000 000 000 000 000 000 075 075
State 000 000 000 4005 4005 000 000 525 4530
Private 000 000 000 000 000 000 000 738 738
Central 000 000 000 000 000 000 000 510 510
Grand Total 000 000 000 4005 4005 000 000 1773 5778
Andaman amp
Nicobar
Lakshadweep
Total (Islands)
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
ISLANDS
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
State Ownership Sector
Mode wise breakup
Grand TotalThermalNuclear Hydro
RES
(MNRE)
SrNo Contents Page
1 Executive summary of Target and Achievement of Transmission Lines during 2019-20
20(1)
2 List of Transmission Lines CommissionedReady for commissioning during Apr-2019 20(2)
Section C - Transmission Lines
1 Executive summary of Target and Achievement of Transmission Lines during 2019-20 As on 30-04-19
(All figures in circuit kms)
Ce
ntr
al S
ecto
r
Sta
te S
ecto
r
JV
Pri
va
te S
ecto
r
To
tal
Ce
ntr
al S
ecto
r
Sta
te S
ecto
r
JV
Pri
va
te S
ecto
r
To
tal
Ce
ntr
al S
ecto
r
Sta
te S
ecto
r
JV
Pri
va
te S
ecto
r
To
tal
Ce
ntr
al S
ecto
r
Sta
te S
ecto
r
JV
Pri
va
te S
ecto
r
To
tal
Ce
ntr
al S
ecto
r
Sta
te S
ecto
r
JV
Pri
va
te S
ecto
r
To
tal
Ce
ntr
al
Se
cto
r
Sta
te S
ec
tor
JV
Pri
va
te S
ec
tor
Gra
nd
To
tal
0 0 0 0 0 0 0 0 2727 958 2334 6019 2239 3416 1143 6798 781 10023 0 10804 5747 14397 3477 23621
Apr19 Programme 0 0 0 0 0 0 0 0 577 416 557 1550 60 890 203 1153 0 309 0 309 637 1615 760 3012
Achievement 0 0 0 0 0 0 0 0 53 0 0 53 0 20 0 20 0 401 0 401 53 421 0 474
Upto Apr-19 Programme 0 0 0 0 0 0 0 0 577 416 557 1550 60 890 203 1153 0 309 0 309 637 1615 760 3012
Achievement 0 0 0 0 0 0 0 0 53 0 0 53 0 20 0 20 0 401 0 401 53 421 0 474
20(1)
220 kV Grand Total 800 kV 500 kV
Programme 2019-20
Programme
Achievement
HVDC765 kV 400 kV
Line
1 2 3 4 5 6
1 400 Bhadla (PG) - Bhadla (RVPN) line DC PGCIL 53
53
2 400 LILO of one ckt Jhanor - Navsari at Vav Ss DC GETCO 20
3 220 Banda-Chitrakoot Line DC UPPTCL 226
4 220 Gorakhpur (PG)-Gola line DC UPPTCL 82
5 220 Hapur(765) - Faridnagar line SC UPPTCL 11
6 220 Kalikiri - Madanapalli line DC APTRANSCO 60
7 220LILO of Gr Noida -Noida Sec-129 at Noida
Sec-148DC UPPTCL 1
8 220LILO of one Ckt of Badshahpur Pali at Sec-
65 GurgaonDC HVPNL 3
9 220 Sultanpur-Sangipur LILO Section at Amethi DC UPPTCL 18
421
0
474
20(2)
Grand Total
2Transmission Lines (220 kV and above) CommissionedReady for commissioning During Apr-2019
Voltage
Level (kV)Name of Transmission Lines
Circuit
Type
Executing
Agency
CENTRAL SECTOR
Total of CENTRAL SECTOR
STATE SECTOR Sector
Total of STATE SECTOR
PRIVATE SECTOR
Total of PRIVATE SECTOR
SlNo
Length(CKm)
As on 30-04-19
SN Contents Page
1 Executive summary of Target and Achievement of Substations during 2019-20 21(1)
2Sub Stations (220 kV and above) commissionedready for commisssioning during Apr-
201921(2)
Section D - Sub Stations
1 Executive summary of Target and Achievement of Substations during 2019-2020 As on 30-04-19
(All figures in circuit MVA)
Ce
ntr
al S
ecto
r
Sta
te S
ecto
r
JV
Pri
va
te S
ecto
r
To
tal
Ce
ntr
al S
ecto
r
Sta
te S
ecto
r
JV
Pri
va
te S
ecto
r
To
tal
Ce
ntr
al S
ecto
r
Sta
te S
ecto
r
JV
Pri
va
te S
ecto
r
To
tal
Ce
ntr
al S
ecto
r
Sta
te S
ecto
r
JV
Pri
va
te S
ecto
r
To
tal
Ce
ntr
al S
ecto
r
Sta
te S
ecto
r
JV
Pri
va
te S
ecto
r
To
tal
Ce
ntr
al S
ec
tor
Sta
te S
ec
tor
JV
Pri
va
te S
ec
tor
Gra
nd
To
tal
3000 0 0 3000 0 0 0 0 18000 3000 6000 27000 5205 19665 4260 29130 800 21786 0 22586 27005 44451 10260 81716
Apr19 Programme 0 0 0 0 0 0 0 0 3000 0 3000 6000 0 1000 2000 3000 0 800 0 800 3000 1800 5000 9800
Achievement 0 0 0 0 0 0 0 0 500 0 0 500 815 1980 0 2795 0 1305 0 1305 1315 3285 0 4600
Upto Apr-19 Programme 0 0 0 0 0 0 0 0 3000 0 3000 6000 0 1000 2000 3000 0 800 0 800 3000 1800 5000 9800
Achievement 0 0 0 0 0 0 0 0 500 0 0 500 815 1980 0 2795 0 1305 0 1305 1315 3285 0 4600
21(1)
220 kV Grand Total 800 kV 500 kV
Programme 2019-20
Programme
Achievement
HVDC765 kV 400 kV
As on 30-04-19
Sl Voltage Ratio Capacity
No (kVkV) (MWMVA)
1 2 3 4 5
1 Bhadla SS (3x1500 3x500 MVA) 765400 PGCIL 500
2 Extn at Tumkur (Pavagada ) PS (2x500 MVA) 400220 PGCIL 500
3 Bongaigaon (2nd ICT) Ss 400220 PGCIL 315
Total of CENTRAL SECTOR 1315
4 Motiram Adda Gorakhpur (Aug) (Additional TF) 400220 UPPTCL 240
5 Muradnagar-II Ghaziabad (Aug) (Additional TF) 400220 UPPTCL 240
6 Noida Sec- 148 GBNagar (New) 400220 UPPTCL 5007 Sarnath Varanasi (Aug) TF- II (500-315) 400220 UPPTCL 1858 Sarojininagar Lucknow Aug) TF- II (500-315) 400220 UPPTCL 185
9 Unnao (Aug) TF-III 400220 UPPTCL 31510 Nawada SS 400220 HVPNL 31511 Kharepatan SS 22033 MSETCL 2512 Prathipadu SS 220132 APTRANSCO 10013 Pali Ss 22066 HVPNL 160
14 A-5 Faridabad Ss 22066 HVPNL 60
15 Rentachintala Ss Aug(3X100-2x100) 220132 APTRANSCO 10016 Amethi Ss 220132 UPPTCL 160
17 Gajokhar Varanasi (Aug) TF- II (160-100) 220132 UPPTCL 60
18 Gola Gorakhpur (New) 220132 UPPTCL 160
19 Khurja Bulandshahr (Aug) TF- II (200-160) 220132 UPPTCL 40
20 RC Green GB Nagar (Aug) TF-II (160-100) 220132 UPPTCL 60
21 Sikandrabad Bulandshahr (Aug) (Additional TF) 220132 UPPTCL 160
22 Sitapur (Aug) (Additional TF) 220132 UPPTCL 160
23 Sohawal Ayodhya (Aug) TF-II (160-100) 220132 UPPTCL 60
TOTAL STATE SECTOR 3285
GRAND TOTAL 4600
21(2)
CENTRAL SECTOR
STATE SECTOR
2Sub-Stations (220 kV and above) CommissionedReady for commissioning During Apr-2019
Name of Sub Stations Executing Agency
SN Contents Page
1 Electricity Generation (MU) Targets and Achievements for 2019-20 22
Section E - Electricity Generation
Programme Achievement Ach Programme Achievement Ach
Central Sector 37545100 3177900 3129530 9848 3177900 3129530 9848
State Sector 37498600 3322500 2950558 8881 3322500 2950558 8881
PvtIPP Sector 37346200 3236400 3195940 9875 3236400 3195940 9875
PvtUTL Sector 1823100 159300 165579 10394 159300 165579 10394
Total 114213000 9896100 9441607 9541 9896100 9441607 9541
Central Sector 5661700 386100 481390 12468 386100 481390 12468
State Sector 6680500 498200 536514 10769 498200 536514 10769
PvtIPP Sector 1206900 57300 80405 14032 57300 80405 14032
PvtUTL Sector 144100 12300 10930 8886 12300 10930 8886
Total 13693200 953900 1109239 11628 953900 1109239 11628
Central Sector 4472000 367300 317765 8651 367300 317765 8651
Total 4472000 367300 317765 8651 367300 317765 8651
Bhutan Import 621800 17500 24396 13941 17500 24396 13941
Central Sector 47678800 3931300 3928685 9993 3931300 3928685 9993
State Sector 44179100 3820700 3487072 9127 3820700 3487072 9127
Pvt Sector 40520300 3465300 3452854 9964 3465300 3452854 9964
Total 133000000 11234800 10893007 9696 11234800 10893007 9696
Provisional based on actual-cum-Assesment
Figs in MU
Cummulative
Achievement
Cummulative
Achievement
Mar-19 Mar-18 Upto Mar-2019 Upto Mar-2018
984785 869291 12675910 10183949
22
1 Electricity Generation (MU) Targets and Achievememts for 2019-20
All India Energy Generation During Apr-19 to Apr-19 (MU)
Target (2019-20)Apr-19 to Apr-19
Sector
Hydro
Thermal
Nuclear
Renewable Energy Generation
Achievement
Apr-2019
98961
95393673
112348
94416
11092
3178
108930
0
20000
40000
60000
80000
100000
120000
Thermal Hydro Nuclear Total
Programme
Achievement
SN Contents Page
1 Energy Power Supply Position (Provisional) for Apr-2019 and during Apr-19 to Apr-19 23
2 Peak Power Supply Position (Provisional) for Apr-2019 and during Apr-19 to Apr-19 24
3 Energy Power Supply Position (Revised) for Mar-2019 and during Apr-19 to Mar-19 25
4 Peak Power Supply Position (Revised) for Mar-2019 and during Apr-19 to Mar-19 26
5 Notified Power cuts Restrictions on Industries during Apr-2019 27
6 Power Supply to Agricultural Sector during Apr-2019 28
Section F - Power supply position
आकड़ मममलयन यननट नट Figures in MU net
ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied
कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )
चडीगढ़ Chandigarh 117 117 0 00 117 117 0 00
दिलली Delhi 2698 2698 1 00 2698 2698 1 00
हरियजणज Haryana 3773 3773 0 00 3773 3773 0 00
दहमजचल परिश Himachal Pradesh 777 777 0 00 777 777 0 00
रमम कशमीि Jammu amp Kashmir 1604 1296 308 192 1604 1296 308 192
परजब Punjab 3646 3646 0 00 3646 3646 0 00
िजरसथजन Rajasthan 6210 6208 2 00 6210 6208 2 00
उतति परिश Uttar Pradesh 10179 10148 32 03 10179 10148 32 03
उततिजखड Uttarakhand 1120 1120 0 00 1120 1120 0 00
उततरी कषतर Northern Region 30094 29786 308 10 30094 29786 308 10
छततीसगढ़ Chhattisgarh 2684 2676 8 03 2684 2676 8 03
गरिजत Gujarat 10718 10718 0 00 10718 10718 0 00
मधय परिश Madhya Pradesh 6006 6006 0 00 6006 6006 0 00
महजिजषटर Maharashtra 14308 14308 0 00 14308 14308 0 00
िमन औि दिउ Daman amp Diu 220 220 0 00 220 220 0 00
िजिि व नगि हवली Dadra amp Nagar Haveli 552 552 0 00 552 552 0 00
गोवज Goa 388 388 0 00 388 388 0 00
पशचिमी कषतर Western Region 34875 34868 8 00 34875 34868 8 00
आनधर परिश Andhra Pradesh 5708 5708 0 00 5708 5708 0 00
तलगजनज Telangana 5725 5725 0 00 5725 5725 0 00
कनजाटक Karnataka 7003 7003 0 00 7003 7003 0 00
किल Kerala 2402 2400 2 01 2402 2400 2 01
तममल नजड Tamil Nadu 10010 10010 0 00 10010 10010 0 00
पडचिी Puducherry 263 263 0 00 263 263 0 00
लकष-दवीप Lakshadweep 4 4 0 0 4 4 0 0
दकषकषणी कषतर Southern Region 31111 31109 2 00 31111 31109 2 00
बबहजि Bihar 2589 2589 0 00 2589 2589 0 00
िजमोिि घजटी ननगम DVC 1772 1772 0 00 1772 1772 0 00
झजिखणड Jharkhand 689 689 0 00 689 689 0 00
ओडडशज Odisha 2689 2689 1 00 2689 2689 1 00
पशशचम बगजल West Bengal 5075 5075 0 00 5075 5075 0 00
मसशककम Sikkim 37 37 0 00 37 37 0 00
अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 7 29 27 2 7
परवी कषतर Eastern Region 12851 12850 1 00 12851 12850 1 00
अरणजचल परिश Arunachal Pradesh 66 66 0 05 66 66 0 05
असम Assam 766 709 57 75 766 709 57 75
मणणपि Manipur 68 67 1 15 68 67 1 15
मघजलय Meghalaya 170 160 10 59 170 160 10 59
ममज़ोिम Mizoram 54 53 0 08 54 53 0 08
नजगजलड Nagaland 54 54 0 08 54 54 0 08
बिपिज Tripura 122 120 1 12 122 120 1 12
उततर-परवी कषतर North-Eastern Region 1300 1228 71 55 1300 1228 71 55
समपणण भारत All India 110231 109842 389 04 110231 109842 389 04
23
ऊरजा पनत ा म कमी ऊरजा पनत ा म कमीEnergy not Supplied
Excludes energy exported to Bangladesh
Energy not Supplied
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
ऊराण वरवदयत आपरत ण शथिरत ररपोरण (परवाणरवलोकन) Energy Power Supply Position Report (Provisional)
राजयState
अपरल 2019 April2019 अपरल2019 -अपरल2019 April2019 to April2019
अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met
कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )
चडीगढ़ Chandigarh 256 256 0 00 256 256 0 00
दिलली Delhi 5664 5664 0 00 5664 5664 0 00
हरियजणज Haryana 8127 8127 0 00 8127 8127 0 00
दहमजचल परिश Himachal Pradesh 1387 1387 0 00 1387 1387 0 00
रमम कशमीि Jammu amp Kashmir 2826 2261 565 200 2826 2261 565 200
परजब Punjab 7015 7015 0 00 7015 7015 0 00
िजरसथजन Rajasthan 10560 10560 0 00 10560 10560 0 00
उतति परिश Uttar Pradesh 19935 19935 0 00 19935 19935 0 00
उततिजखड Uttarakhand 1922 1922 0 00 1922 1922 0 00
उततरी कषतर Northern Region 54476 53985 491 09 54476 53985 491 09
छततीसगढ़ Chhattisgarh 4596 4574 22 05 4596 4574 22 05
गरिजत Gujarat 17871 17865 6 00 17871 17865 6 00
मधय परिश Madhya Pradesh 10018 10018 0 00 10018 10018 0 00
महजिजषटर Maharashtra 23158 23150 8 00 23158 23150 8 00
िमन औि दिउ Daman amp Diu 341 340 1 02 341 340 1 02
िजिि व नगि हवली Dadra amp Nagar Haveli 818 818 0 00 818 818 0 00
गोवज Goa 594 594 0 00 594 594 0 00
पशचिमी कषतर Western Region 56242 56222 20 00 56242 56222 20 00
आनधर परिश Andhra Pradesh 9151 9151 0 00 9151 9151 0 00
तलगजनज Telangana 10191 10191 0 00 10191 10191 0 00
कनजाटक Karnataka 12681 12681 0 00 12681 12681 0 00
किल Kerala 4309 4300 8 02 4309 4300 8 02
तममल नजड Tamil Nadu 15972 15972 0 00 15972 15972 0 00
पडचिी Puducherry 482 480 2 05 482 480 2 05
लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0
दकषकषणी कषतर Southern Region 49155 49103 52 01 49155 49103 52 01
बबहजि Bihar 5357 5357 0 00 5357 5357 0 00
िजमोिि घजटी ननगम DVC 3039 3039 0 00 3039 3039 0 00
झजिखणड Jharkhand 1266 1266 0 00 1266 1266 0 00
ओडडशज Odisha 5389 5389 0 00 5389 5389 0 00
पशशचम बगजल West Bengal 8666 8666 0 00 8666 8666 0 00
मसशककम Sikkim 100 100 0 00 100 100 0 00
अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7
परवी कषतर Eastern Region 23349 23349 0 00 23349 23349 0 00
अरणजचल परिश Arunachal Pradesh 139 136 3 22 139 136 3 22
असम Assam 1712 1667 45 26 1712 1667 45 26
मणणपि Manipur 197 188 9 46 197 188 9 46
मघजलय Meghalaya 336 336 0 00 336 336 0 00
ममज़ोिम Mizoram 116 113 3 26 116 113 3 26
नजगजलड Nagaland 157 131 26 166 157 131 26 166
बिपिज Tripura 292 291 1 03 292 291 1 03
उततर-परवी कषतर North-Eastern Region 2848 2780 68 24 2848 2780 68 24
समपणण भारत All India 177411 176810 601 03 177411 176810 601 03
24
मजग की पनत ा म कमी Demand not Met
Excludes the supply to Bangladesh
राजयStateअपरल 2019 April2019
मजग की पनत ा म कमी Demand not Met
अधिकतम वरवदयत आपरत ण शथिरत ररपोरण (परवाणरवलोकन) Peak Power Supply Position Report (Provisional)
आकड़ मगज वजट नट Figures in MW netअपरल2019 -अपरल2019 April2019 to April2019
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
आकड़ मममलयन यननट नट Figures in MU net
ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied
कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )
चडीगढ़ Chandigarh 96 96 0 00 1561 1561 0 00
दिलली Delhi 1931 1930 1 00 32299 32282 17 01
हरियजणज Haryana 3658 3658 0 00 53665 53665 0 00
दहमजचल परिश Himachal Pradesh 832 830 2 02 9850 9618 232 24
रमम कशमीि Jammu amp Kashmir 1767 1414 353 200 19593 15868 3725 190
परजब Punjab 3585 3585 0 00 55288 55275 13 00
िजरसथजन Rajasthan 6774 6770 4 01 79826 79637 189 02
उतति परिश Uttar Pradesh 8754 8691 63 07 117101 116118 984 08
उततिजखड Uttarakhand 1067 1067 0 00 13845 13753 92 07
उततरी कषतर Northern Region 28464 28041 423 15 383028 377776 5251 14
छततीसगढ़ Chhattisgarh 2464 2457 8 03 26130 26076 54 02
गरिजत Gujarat 9890 9890 0 00 116588 116572 15 00
मधय परिश Madhya Pradesh 6236 6236 0 00 75667 75665 2 00
महजिजषटर Maharashtra 13631 13631 0 00 158285 158148 137 01
िमन औि दिउ Daman amp Diu 221 221 0 00 2557 2557 0 00
िजिि व नगि हवली Dadra amp Nagar Haveli 553 553 0 00 6317 6317 0 00
गोवज Goa 362 362 0 00 4283 4280 3 01
पशचिमी कषतर Western Region 33357 33349 8 00 389827 389615 212 01
आनधर परिश Andhra Pradesh 6072 6071 1 00 63735 63677 58 01
तलगजनज Telangana 6930 6929 1 00 66697 66635 62 01
कनजाटक Karnataka 7614 7612 1 00 71759 71690 69 01
किल Kerala 2489 2488 1 00 25029 24911 118 05
तममल नजड Tamil Nadu 10247 10245 2 00 109375 109273 102 01
पडचिी Puducherry 252 251 1 04 2761 2751 10 03
लकष-दवीप Lakshadweep 4 4 0 0 46 46 0 0
दकषकषणी कषतर Southern Region 33605 33597 8 00 339355 338938 417 01
बबहजि Bihar 2319 2318 1 00 30052 29827 225 07
िजमोिि घजटी ननगम DVC 1773 1772 1 00 22365 21995 369 17
झजिखणड Jharkhand 698 697 1 01 8682 8461 221 25
ओडडशज Odisha 2583 2582 1 00 31810 31781 30 01
पशशचम बगजल West Bengal 4585 4584 2 00 52237 52078 159 03
मसशककम Sikkim 41 41 0 00 513 512 0 01
अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 67 346 323 23 67
परवी कषतर Eastern Region 11999 11995 5 00 145658 144654 1004 07
अरणजचल परिश Arunachal Pradesh 61 60 0 06 864 855 9 10
असम Assam 680 656 23 34 9532 9204 328 34
मणणपि Manipur 68 68 1 09 916 906 10 11
मघजलय Meghalaya 173 173 0 03 1955 1953 1 01
ममज़ोिम Mizoram 50 49 0 09 668 661 8 12
नजगजलड Nagaland 58 57 1 20 902 809 93 103
बिपिज Tripura 150 150 0 00 1859 1837 21 11
उततर-परवी कषतर North-Eastern Region 1240 1214 26 21 16696 16225 471 28
समपणण भारत All India 108665 108196 469 04 1274564 1267209 7355 06
Note The revised data for March 2019 is not avaliable
Excludes energy exported to Bangladesh
राजयState
ऊराण वरवदयत आपरत ण शथिरत ररपोरण (परवाणरवलोकन) Energy Power Supply Position Report (Provisional)
25
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
Energy not Supplied Energy not Supplied
मािण2019 March2019 अपरल2018 -मािण2019 April2018 to March2019
ऊरजा पनत ा म कमी ऊरजा पनत ा म कमी
अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met
कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )
चडीगढ़ Chandigarh 223 223 0 00 369 369 0 00
दिलली Delhi 4016 4016 0 00 7016 7016 0 00
हरियजणज Haryana 6544 6544 0 00 10270 10270 0 00
दहमजचल परिश Himachal Pradesh 1683 1683 0 00 1700 1700 0 00
रमम कशमीि Jammu amp Kashmir 3277 2622 655 200 3277 2622 655 200
परजब Punjab 6564 6564 0 00 12638 12638 0 00
िजरसथजन Rajasthan 11885 11885 0 00 13276 13276 0 00
उतति परिश Uttar Pradesh 16220 16220 0 00 20498 20062 436 21
उततिजखड Uttarakhand 2002 2002 0 00 2216 2216 0 00
उततरी कषतर Northern Region 47925 47356 569 12 63166 61726 1440 23
छततीसगढ़ Chhattisgarh 4444 4128 316 71 4444 4270 174 39
गरिजत Gujarat 16263 16263 0 00 17053 16963 90 05
मधय परिश Madhya Pradesh 12328 12323 5 00 13815 13815 0 00
महजिजषटर Maharashtra 22361 22291 70 03 23864 23254 610 26
िमन औि दिउ Daman amp Diu 336 336 0 01 357 356 1 02
िजिि व नगि हवली Dadra amp Nagar Haveli 800 799 1 01 816 815 1 01
गोवज Goa 538 538 0 00 596 596 0 00
पशचिमी कषतर Western Region 53132 52965 167 03 56675 55821 853 15
आनधर परिश Andhra Pradesh 8977 8977 0 00 9459 9453 6 01
तलगजनज Telangana 10471 10471 0 00 10815 10815 0 00
कनजाटक Karnataka 12841 12841 0 00 12841 12841 0 00
किल Kerala 4264 4228 36 09 4264 4228 36 09
तममल नजड Tamil Nadu 15712 15712 0 00 15712 15712 0 00
पडचिी Puducherry 427 412 15 34 427 412 15 34
लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0
दकषकषणी कषतर Southern Region 49464 49464 0 00 49464 49464 0 00
बबहजि Bihar 4633 4633 0 00 5115 5084 31 06
िजमोिि घजटी ननगम DVC 3035 3035 0 00 3035 3035 0 00
झजिखणड Jharkhand 1210 1210 0 00 1339 1291 48 36
ओडडशज Odisha 4827 4827 0 00 5357 5357 0 00
पशशचम बगजल West Bengal 8287 8287 0 00 9130 9123 7 01
मसशककम Sikkim 100 100 0 00 106 106 0 00
अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7
परवी कषतर Eastern Region 21658 21658 0 00 23141 22733 408 18
अरणजचल परिश Arunachal Pradesh 133 131 2 15 138 138 0 01
असम Assam 1539 1508 31 20 1865 1809 56 30
मणणपि Manipur 204 199 5 25 219 216 3 12
मघजलय Meghalaya 357 357 0 00 374 372 1 04
ममज़ोिम Mizoram 108 105 3 28 121 119 2 17
नजगजलड Nagaland 127 125 2 16 156 138 18 116
बिपिज Tripura 249 249 0 00 298 293 5 17
उततर-परवी कषतर North-Eastern Region 2540 2535 5 02 2967 2850 117 39
समपणण भारत All India 169464 168745 719 04 177022 175528 1494 08
Note The revised data for March 2019 is not avaliable 26
अधिकतम वरवदयत आपरत ण शथिरत ररपोरण (परवाणरवलोकन) Peak Power Supply Position Report (Provisional)
आकड़ मगज वजट नट Figures in MW net
राजयStateमािण2019 March2019 अपरल2018 -मािण2019 April2018 to March2019
मजग की पनत ा म कमी मजग की पनत ा म कमी Demand not MetDemand not Met
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
Excludes the supply to Bangladesh
अपरल 2019 April2019 अपरल2018 -मािण2019 April2019 to April2019
उततरी कषतर Northern Region
चडीगढ़ Chandigarh(Data Not Received)दिलली Delhi
हरियजणज Haryana
दहमजचल परिश Himachal Pradeshरमम कशमीि Jammu amp Kashmir(Data
Not Received)परजब Punjab
िजरसथजन Rajasthanउतति परिश Uttar Pradesh
उततिजखड Uttarakhand
पशचिमी कषतर Western Region
छततीसगढ़ Chhattisgarh
Apr-Nov 2018- No cuts
Maximum Demand cut-58MW
Energy cut- 00020-00032 MUsday
गरिजत Gujarat
मधय परिश Madhya Pradesh
महजिजषटर Maharashtra
गोवज Goa
दकषकषणी कषतर Southern Region
आनधर परिश Andhra Pradesh
तलगजनज Telangana
कनजाटक Karnataka
किल Kerala
तममल नजड Tamil Nadu
पडचिी Puducherryपरवी कषतर Eastern Region
बबहजि Bihar
झजिखणड Jharkhand
ओडडशज Odisha
पशशचम बगजल West Bengal
No N
otifie
d Cu
ts
27
मािण 2019 म इडथरीर पर वरवदयत करौती का वरवरवरण Notified Power CutsRestrictions on Industries during April2019
राजय कषतर State Regionऊराणमाग करौती EnergyDemand Cut
No N
otifie
d Cu
tsNo
Notifie
d Cu
ts
अपरल2019 April 2019 अपरल2019 -अपरल2019 April2019 to April2019
उततरी कषतर Northern Region
चडीगढ़ Chandigarh Data not received Data not received
दिलली Delhi Data not received Data not received
हरियजणज Haryana 0811 hrsday 0811 hrsday
दहमजचल परिश Himachal Pradesh HPSEBL has only 2 agriculture consumers and uninterrupted
power is being supplied to agriculture sector
HPSEBL has only 2 agriculture consumers and uninterrupted
power is being supplied to agriculture sector
रमम कशमीि Jammu amp Kashmir Data not received Data not received
परजब Punjab 379 hrsday 379 hrsday
िजरसथजन Rajasthan 0630 hrsday 0630 hrsday
उतति परिश Uttar Pradesh 2157 hrsday 2157 hrsday
उततिजखड Uttarakhand 2359 hrsday 2359 hrsday
पशचिमी कषतर Western Region
छततीसगढ़ Chhattisgarh 18 hrsday 18 hrsday
गरिजत Gujarat 8 hrsday 8 hrsday
मधय परिश Madhya Pradesh Three-Phase Supply(Irrigation)- 0953 hrs day Three-Phase
(Mixed) Supply - 2334 hrs day
Three-Phase Supply(Irrigation)- 0953 hrs day Three-Phase
(Mixed) Supply - 2334 hrs day
महजिजषटर Maharashtra Three-Phase Supply(Irrigation)- 9 hrs day Three-Phase Supply(Irrigation)- 9 hrs day
गोवज Goa No restriction No restriction
दकषकषणी कषतर Southern Region
आनधर परिश Andhra Pradesh 07 hrsday 07 hrsday
तलगजनज Telangana 24 hrsday 24 hrsday
कनजाटक Karnataka 6 hrsday 6 hrsday
किल Kerala No Restrictions No Restrictions
तममल नजड Tamil Nadu 9 hrsday (6 hrs during day time and 3 hrs during night time) 9 hrsday (6 hrs during day time and 3 hrs during night time)
पडचिी Puducherry No Restrictions No Restrictions
परवी कषतर Eastern Region
बबहजि Bihar 18 hrsday 18 hrsday
झजिखणड Jharkhand 20 hrsday 20 hrsday
ओडडशज Odisha 24 hrsday 24 hrsday
पशशचम बगजल West Bengal 23 hrsday 23 hrsday
28
मारच 2019 कषि कषतर को षिदयत आपरतच का षििरण Power Supply to Agricultural Sector during March2019
राजय कषतर State Regionऔसत वरवदयत आपरत ण घनरो म Average Hours of Supply
On segregated feeders
SNo Contents Page
1 Growth of Installed Capacity since 6th Plan 29
2 Progress of Transmission Sector since 6th Plan 30
3 All India Yearly Coal consumption for Power Generation (Utilities)
4 All India Annual Per Capita Consumption of Electricity since -2006
5 Average cost of power supply amp Average realisation (Paisakwh)
6 Growth of Rural Electrification amp Pump Sets Energisation
7 Status of Hydro Schemes Cleared by the CEA in Apr-2019
Section G - Growth of Power Sector
31
32
(In MW)
Coal Gas Diesel Total
End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472
End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634
End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537
End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596
End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921
End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703
End of 12th Plan 19216288 2532938 83763 21832988 6780 4447842 50018 31960630
Up to Apr-2019 20070450 2493722 63763 22627934 678000 4539922 7764163 35610019
Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-17) = 51529 MW
Electricity Generation (MU) Targets and Achievements for 2016-17
Coal Gas Diesel Nuclear Hydro Res Total
2007045 2493722 637629 678000 453992 77641625 22925174
29
1 Growth of Installed Capacity Since 6th Plan
Plan YearThermal
Nuclear Hydro RES (MNRE) Total
2007045
2493722637629
678000
4539922
77641625
Total Installed Capacity 35610019 MW
Coal Gas Diesel Nuclear Hydro Res
Progress of Transmission Sector in the Country up to April 2019
1 TRANSMISSION LINES (All fig in CKM)
At the end of
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
6th plan 0 0 0 0 0 0 0 0 0 0 0 0 1831 4198 0 6029 1641 44364 0 46005 3472 48562 0 52034
7th plan 0 0 0 0 0 0 0 0 0 0 0 0 13068 6756 0 19824 4560 55071 0 59631 17628 61827 0 79455
8th plan 0 0 0 0 1634 0 0 1634 0 0 0 0 23001 13141 0 36142 6564 73036 0 79600 31199 86177 0 117376
9th plan 0 0 0 0 3234 1504 0 4738 751 409 0 1160 29345 20033 0 49378 8687 88306 0 96993 42017 110252 0 152269
10th plan 0 0 0 0 4368 1504 0 5872 1775 409 0 2184 48708 24730 0 73438 9444 105185 0 114629 64295 131828 0 196123
11th Plan 0 0 0 0 5948 1504 1980 9432 4839 411 0 5250 71023 30191 5605 106819 10140 125010 830 135980 91950 157116 8415 257481
12th Plan 6124 0 0 6124 5948 1504 1980 9432 25465 1177 4598 31240 92482 48240 17065 157787 11014 151276 978 163268 141033 202197 24621 367851
13th Plan (Up
to Mar2019)6124 0 0 6124 5948 1504 1980 9432 33692 1512 6605 41809 101335 58238 21173 180746 11734 162552 1010 175296 158833 223806 30768 413407
13th Plan (Up
to Apr-19)6124 0 0 6124 5948 1504 1980 9432 33745 1512 6605 41862 101335 58258 21173 180766 11734 162953 1010 175697 158886 224227 30768 413881
27150 600 MW of 132 kV Inter-Regional power transmission capacity links which are operated radially from time to time is not added in the total
75050
47900
24000
99050
30
Grand Total
Note - The figure upto the end of 10th plan in for stringing progress including the lines not commissioned Now only commissioned lines are reckoned Accordingly the figure for 10th plan (end) may read
as 187555 after adjusting with (-) 10852 Ckm
Inter-regional Power Transfer Capacity (MW)
plusmn 800 kV HVDC plusmn 500 kV HVDC 765 kV 400 kV 220 kV
IR addition in 12th
Plan (up to March
2017)
Inter-regional
Transmission
Capacity at the end
of Plan Period 2017-
22 (as on April19)
IR at the end of 11th
PlanIR at the end of 12th
Plan
IR Capacity Addition
at the end of Plan
Period 2017-22 (Till
April 19)
2004-05 27800
2005-06 28100
2006-07 30200
2007-08 33000
2008-09 35500
2009-10 36700
2010-11 38700
2011-12 41756
2012-13 45460
2013-14 48940
2014-15 53040
2015-16 54590
2016-17 57430
2017-18 60800
2018-19 62890
Year
2005-06
2006-07
2007-08
2008-09
2009-10
2010-11
2011-12
2012-13
2013-14
2014-15
2015-16
2016-17
2017-18
2018-19
2004-05 254 209 7568
2005-06 260 221 7636
2006-07 276 227 7423
2007-08 293 239 7727
2008-09 340 263 8713
2009-10 355 268 8870
2010-11 398 303 11975
2011-12 455 330 13514
2012-13 501 376 14867
2013-14 518 175
2014-15 520
Source- PFC Reports on the performance of State Power Utilities 31
1181
7335
7786
91441
8188
88363
957
1010
1075
1122
1149
(GrossGen+ Net Import) Mid-year population Provisional
5 Average cost of power supply amp average realization ( paiseKWH )
Yearcost of supply
(paiseunit)
Realization(paiseunit)
Including AgricultureOnly
Agriculture
6719
7171
3 All India yearly Coal Consumption for Power Generation (Utilities)
YEARCoal Consumption
Million Tonnes
4 All India Annual per Capita consumption of Electricity Since 2006
Per Capita Consumption ( kWh)
6314
Sl
NoExecuting Agency
Installed
Capacity (MW)Cost (Rs crore)
Date of
Clearance
32
Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as
Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received
from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made
available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified
villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is
independent of the earlier published reports
No Hydro Electric Project has been issued concurrenceAppraisal letter by CEA during April 2019
7 Status of Hydro Schemes Cleared by the CEA in Apr-2019
Name of Scheme
1999-002000-01
297594
010408 to 310309010409 to 310310
10th Plan
2005-062006-07
322968331020
6 Growth Of Rural Electrification amp Pumpsets Energisation
Plan Year
9th Plan2002-03
134092626
4111
Pump Sets Energised Villages Electricfied (Nos)
2001-02
284064367244
1218
27801997-981998-99
3207
482864
12632
1576036
4451722594
15455554
2314176
397343611750
2093311060316074
65109527813884
46708
18423975
499150
2003-042004-05
5743
9769
Cumu upto End of 10th Plan
010407 to 310308
010410 to 310311557976840909
010411 to 310312
412667
86293726
No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification
since 2004-05
65291374575 296361511th Plan
Cumu upto End of 11th Plan
596556 21212860
557439Cummulative up to end of 12th Plan
SN Contents Page
1 Rate of sale of power for the year 2016-17 33-41
RATE OF SALE OF POWER FOR THE YEAR 2016-17
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) NORTHERN REGION
CENTRAL SECTOR
BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 18000 66900 19800
CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 54000 222400 21600
CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 30000 144400 19600
CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 23100 91700 42600
PARBATI - III HPS NHPC LTD HYDRO-HYDRO 52000 68200 54800
DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 28000 95600 30000
CHUTAK NHPC LTD HYDRO-HYDRO 4400 22000 79800
DULHASTI HPS NHPC LTD HYDRO-HYDRO 39000 228000 56400
SALAL HPS NHPC LTD HYDRO-HYDRO 69000 342300 11000
TANAKPUR HPS NHPC LTD HYDRO-HYDRO 9420 43000 29600
URI HPS -I NHPC LTD HYDRO-HYDRO 48000 280300 16000
URI HPS - II NHPC LTD HYDRO-HYDRO 24000 147300 48600
NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 4500 24600 88200
SEWA - II NHPC LTD HYDRO-HYDRO 12000 47100 43400
ANTA CCPP NTPC LTD THERMAL-GASN 41930 67539 32400
AURAIYA CCPP NTPC LTD THERMAL-GASN 66336 53501 39100
BADARPUR TPS NTPC LTD THERMAL-COAL 70500 159153 44800
DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 84000 296170 42300
DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 98000 526686 46300
DADRI CCPP NTPC LTD THERMAL-GASHSD 82978 227469 33000
FARIDABAD CCPP NTPC LTD THERMAL-GASN 43159 115577 30800
RIHAND STPS I NTPC LTD THERMAL-COAL 100000 596766 24500
RIHAND STPS II NTPC LTD THERMAL-COAL 100000 737069 24600
RIHAND STPS III NTPC LTD THERMAL-COAL 100000 706546 30600
SINGRAULI STPS NTPC LTD THERMAL-COAL 200000 1394068 20400
TANDA TPS NTPC LTD THERMAL-COAL 44000 295438 40800
UNCHAHAR TPS I NTPC LTD THERMAL-COAL 42000 256454 39800
UNCHAHAR TPS II NTPC LTD THERMAL-COAL 42000 273577 38900
UNCHAHAR TPS III NTPC LTD THERMAL-COAL 21000 142780 43000
KOLDAM NTPC LTD HYDRO-HYDRO 80000 363260 43600
NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 303575 25841
RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 108000 668677 35374
NJHPS SJVNL HYDRO-HYDRO 150000 699496 23820
RAMPUR HPS SJVNL HYDRO-HYDRO 41202 195982 32260
TEHRI HPP THDC HYDRO-HYDRO 100000 272543 51800
KOTESHWAR HEP THDC HYDRO-HYDRO 40000 106244 53400
IGSTPS JHAJJAR ARAVALI P CPL THERMAL-COAL 150000 510429 49490
NEYVELI BARSINGSAR NEYVELI LIG CORP LTD THERMAL-LIG 25000 127520 38040
STATE SECTOR
PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 21000 14222 48200
PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 21000 19205 48400
PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 25000 102257 42600
PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 25000 62107 41800
DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 60000 312213 41000
RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 120000 35767442200
WYC HYDEL STATION HPGCL HYDRO-HYDRO 6240 20365 24900
GIRI POWER HOUSE HPSEB HYDRO-HYDRO 6000 13958 7600
ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 1695 5467 11900
BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 12000 18528 6700
GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 2250 7462 22500
BASSI POWER HOUSE HPSEB HYDRO-HYDRO 6600 29649 7500
BINWA POWER HOUSE HPSEB HYDRO-HYDRO 600 2749 19300
ANNEXURE-I
RATE OF SALE OF POWER FOR THE YEAR 2016-2017
Page 33
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) GAJ POWER HOUSE HPSEB HYDRO-HYDRO 1050 2914 26700
BANER POWER HOUSE HPSEB HYDRO-HYDRO 1200 2864 16200
HOLI POWER HOUSE HPSEB HYDRO-HYDRO 300 616 22500
THIROT POWER HOUSE HPSEB HYDRO-HYDRO 450 1126 22500
KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 1200 3064 22500
LARJI POWER HOUSE HPSEB HYDRO-HYDRO 12600 53677 23700
NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 250 750 31000
CHABA POWER HOUSE HPSEB HYDRO-HYDRO 175 465 23300
RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 150 101 13400
SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 200 000 22500
KILLAR HPSEB HYDRO-HYDRO 030 050 22500
BHABA AUGUMENP H HPSEB HYDRO-HYDRO 450 1276 22500
BS CHAMBA HPSEB HYDRO-HYDRO 045 099 19500
GUMMA HPSEB HYDRO-HYDRO 300 423 22500
GAS TURBINE POWER STATION IPGCL THERMAL-GAS 27000 67233 39300
PPS-I PPCL THERMAL-GAS 33000 175905 38300
PPS-III PPCL THERMAL-GAS 137120 196879 36100
LOWER JHELUM JampKPDD HYDRO-HYDRO 10500 60214 5100
UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 2260 10514 6300
UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 10500 44202 8500
GANDHARBAL JampKPDD HYDRO-HYDRO 1500 8925 4700
KARNAH MPH JampKPDD HYDRO-HYDRO 200 1122 31000
CHENANI I JampKPDD HYDRO-HYDRO 2330 10892 6600
CHENANI II JampKPDD HYDRO-HYDRO 200 1188 9300
CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 750 3634 14200
IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 375 2108 18500
IGO MERCHELLONG JampKPDD HYDRO-HYDRO 300 1572 29700
PAHALGAM MHP JampKPDD HYDRO-HYDRO 450 1713 32900
MARPACHOO JampKPDD HYDRO-HYDRO 075 375 29800
HAFTAL JampKPDD HYDRO-HYDRO 100 483 28700
SANJAK JampKPDD HYDRO-HYDRO 126 441 36000
SEWA-III JampKPDD HYDRO-HYDRO 900 3273 20200
BHADERWAH JampKPDD HYDRO-HYDRO 150 935 8900
BAZGO JampKPDD HYDRO-HYDRO 030 108 33300
SUMOOR JampKPDD HYDRO-HYDRO 010 045 35400
HUNDER JampKPDD HYDRO-HYDRO 040 176 26200
STAKNA JampKPDD HYDRO-HYDRO 400 1933 4100
KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 124000 662879 31360
SURATGARH TPS RRVUNL THERMAL-COAL 150000 402328 41730
CHHABRA TPS 1amp 2 RRVUNL THERMAL-COAL 50000 305946 36700
CHHABRA TPS 3 RRVUNL THERMAL-COAL 25000 151536 36700
CHHABRA TPS 4 RRVUNL THERMAL-COAL 25000 155896 36700
RAMGARH GT POWER PROJECT RRVUNL THERMAL-COAL 22050 43177 41800
RAMGARH GAS T P PROJECT 3 RRVUNL THERMAL-GAS 5000 93615 41800
DHOLPUR C C POWER PROJECT RRVUNL THERMAL-R-LNG 33000 9486 46110
MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 14000 20855 34192
MINI MICRO HYDEL (MMH) P S RRVUNL HYDRO-HYDRO 2385 851 37800
KALISINDH TPP 1 RRVUNL THERMAL-COAL 60000 341543 45000
KALISINDH TPP 2 RRVUNL THERMAL-COAL 60000 211588 45000
KHARA HEP UPJVNL HYDRO-HYDRO 7200 26654 7200
MATATILLA HEP UPJVNL HYDRO-HYDRO 3060 12219 6500
OBRA HEP UPJVNL HYDRO-HYDRO 9900 21517 6300
RIHAND UPJVNL HYDRO-HYDRO 30000 57369 5500
ANPARA A TPS UPRVUNL THERMAL-COAL 63000 317536 27000
ANPARA B TPS UPRVUNL THERMAL-COAL 100000 705605 22700
ANPARA D UPRVUNL THERMAL-COAL 100000 300158 39800
HARDUAGANJ TPS UPRVUNL THERMAL-COAL 16500 45817 49200
HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 50000 304389 46600
OBRA A TPS UPRVUNL THERMAL-COAL 28800 13158 34000
OBRA B TPS UPRVUNL THERMAL-COAL 100000 328124 21900
Page 34
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) PANKI TPS UPRVUNL THERMAL-COAL 21000 66488 50300
PARICHHA TPS UPRVUNL THERMAL-COAL 22000 38762 49400
PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 42000 231931 45600
PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 50000 276722 50400
CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 24000 70845 8290
CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 14400 75366 8390
DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 3375 9595 12080
DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 5100 18701 10520
KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4140 17359 12330
KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 12000 33001 9420
KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 3000 11953 8320
TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 9000 33983 12460
MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 30400 124510 16110
RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 19800 17897 10550
MPUR UTTARAKHAND JVNL HYDRO-HYDRO 930 5121 19200
PATHRI UTTARAKHAND JVNL HYDRO-HYDRO 2040 11636 14200
GALOGI UTTARAKHAND JVNL HYDRO-HYDRO 300 648 12500
PRIVATE SECTOR
MGTPP CLP INDIA PVT LTD THERMAL-COAL 132000 268902 41940
SHRINAGAR HEP ALAKNANDA HPCL HYDRO-HYDRO 33000 127414 48800
GAMA INFRAPROP CCPP GAMA INFRAPROP PVT THERMAL-GAS 22500 52686 47000
PPGCL (BARA) JP POWER VENTURES LTD THERMAL-COAL 198000 448200 38500
MALANA HEP MALANA PCL HYDRO-HYDRO 8600 26354 29792
MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 10000 30369 32580
ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 19200 56347 36079
KASHANG HEP H P PCL HYDRO-HYDRO 19500 5034 29200
BASPA-II HEP HBPCL HYDRO-HYDRO 30000 132769 13600
KARCHAM WANGTOO HEP HBPCL HYDRO-HYDRO 100000 434386 36600
RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 108000 582600 43700
RITHALA COMBI CY POWER PLANT TATA POWER DDL THERMAL-GAS 9480 000 11900
RAJPURA TPS NABHA POWER LTD THERMAL-GAS 140000 901484 39000
TALWANDI SABO POWER LTD TALWANDI SABO POWER LTD THERMAL-COAL 198000 636040 49548
ROJA THERMAL POWER STATION ROJA POWER SCL THERMAL-COAL 120000 727200 43400
KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 34400 63400
BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 36000 62600
MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 38200 60800
UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 37900 61500
KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 42300 58800
LALITPUR PGCL BAJAJ ENERGY PVT LTD THERMAL-COAL 198000 359400 47300
PRAYAGRAJ PGCL PRAYAGRAJ PGCL THERMAL-COAL 132000 448200 38595
KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 132000 783182 33438
WESTERN REGION
CENTRAL SECTOR
INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 100000 325333 23892
OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 52000 141663 34001
GANDHAR CCPP NTPC LTD THERMAL-GAS 65739 221924 28700
KAWAS CCPP NTPC LTD THERMAL-GASN 65620 167929 27000
KORBA I amp II NTPC LTD THERMAL-COAL 210000 1499171 20500
KORBA III NTPC LTD THERMAL-COAL 50000 358746 26600
SIPAT STPS I NTPC LTD THERMAL-COAL 198000 1479902 26800
SIPAT STPS II NTPC LTD THERMAL-COAL 100000 766549 26500
VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 126000 693142 25800
VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 100000 608781 23800
VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 100000 673475 27600
VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 100000 655924 32900
VINDHYACHAL STPS V NTPC LTD THERMAL-COAL 50000 328265 31700
MOUDA I NTPC LTD THERMAL-COAL 100000 343130 44500
MOUDA Ii NTPC LTD THERMAL-COAL 66000 40637 39900
RATNAGIRI GAS amp POWER PVT LTD RGPPL THERMAL-GAS 196708 442485 47000
KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 000 24729
TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 32000 201227 10740
Page 35
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 365122 19069
TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 787444 29324
STATE SECTOR
GSEG-HAZIRA15610 MW GUJARAT S ENEGEN LTD THERMAL-GAS 15610 1805 28200
GSEG-HAZIRA35143 MW GUJARAT S ENEGEN LTD THERMAL-GAS 35130 22276 51300
GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 21978 51800
AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 13929 26100
KORBA TPS EAST CSPGCL THERMAL-COAL 44000 198673 33880
DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 365808 27570
KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 316500 30420
HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 532878 19410
CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 515 58300
MTTPS CHAMPA U-I CSPGCL THERMAL-COAL 50000 220376 39000
MTTPS CHAMPA U-II CSPGCL THERMAL-COAL 50000 23709 10000
SHP GANGREL CSPGCL HYDRO-HYDRO 1000 2350 36790
BANGO HEP CSPGCL HYDRO-HYDRO 12000 14662 8900
MHP KORBA WEST CSPGCL HYDRO-HYDRO 170 859 38190
SIKASAR HEP CSPGCL HYDRO-HYDRO 700 418 26870
DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8843 74500
DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 19446 51500
GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 66388 71600
GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127488 41300
KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 96072 43900
KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 29841 56400
SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 184966 58800
UKAI 1-5 GSECL THERMAL-COAL 85000 204891 46900
UKAI TPS 6 GSECL THERMAL-COAL 50000 284448 48200
WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 271999 58300
WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 82808 44100
KADANA HPS GSECL HYDRO-HYDRO 24200 34433 16800
UKAI HPS GSECL HYDRO-HYDRO 30500 40585 6100
TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 123000 11500
BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 8900 10900
BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 7200 27500
JHINNA HPS MPPGCL HYDRO-HYDRO 2000 9700 18500
RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 44300 3400
GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 17300 4600
SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 4100 16900
MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 14600 27000
PENCH HPS MPPGCL HYDRO-HYDRO 16000 23700 8100
RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 3000 16900
AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 134400 35100
SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 283800 38700
SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 344600 34300
SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 111600 61600
SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 211800 58000
SSTPS PH-I MPPGCL THERMAL-COAL 120000 233100 84300
BHUSAWAL TPS MSPGCL THERMAL-COAL 142000 566258 51100
CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1365682 33700
KHAPERKHEDA MSPGCL THERMAL-COAL 134000 706207 39100
KORADI TPS MSPGCL THERMAL-COAL 62000 443206 42000
NASIK TPS MSPGCL THERMAL-COAL 63000 297275 47000
PARLI TPS MSPGCL THERMAL-COAL 113000 175934 71600
PARAS MSPGCL THERMAL-COAL 50000 267931 38700
URAN CCPP MSPGCL THERMAL-GAS 67200 320330 30600
KOYANA MSPGCL HYDRO-HYDRO 195600 328155 13100
SMALL HYDRO POWER PLANTS MSPGCL HYDRO-HYDRO 45400 93062 30500
BHIRA MSPGCL HYDRO-HYDRO 8000 10046 8400
TILLARI MSPGCL HYDRO-HYDRO 8900 10584 3100
SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 233298 20500
SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 87633 20500
PRIVATE SECTOR
Page 36
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 81282 46750
JNSTPP(JAYPEE NIGRIE) JP POWER VENTURES LTD THERMAL-COAL 132000 726695 29310
MB POWER MB POWER THERMAL-COAL 120000 345632 38310
ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 754922 28671
ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 780761 23495
ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 198000 1263784 32090
ADANI POWER MAHARA ADANI POWER LTD THERMAL-COAL 330000 1666191 34124
AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 170065 36827
SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 252035 45129
ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 458551 36000
ESSAR POWER MP LTD ESSAR POWER MP LTD THERMAL-COAL 60000 243040 28600
VEDANTA LTD (P P -I) VEDANTA LTD THERMAL-GAS 3000 15044 24000
VEDANTA LTD (P P -II) VEDANTA LTD THERMAL-GAS 3000 21293 24000
PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 8234600 24000
165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 5850 64390
145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 68717 40349
SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 132655 28776
SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 144686 38567
MUNDRA UMPPCOASTAL GUJARAT POWER
LTD THERMAL-IMP COAL 400000 2530300
23900
LANCO AMARKANTAK TPP PATHADIH
U-ILANCO AMARKAN POWER LTD THERMAL-COAL 30000 195500
29200
LANCO AMARKANTAK TPP PATHADIH
U-IILANCO AMARKAN POWER LTD THERMAL-COAL 30000 206900
27600
BARADARHA TPS D B POWER LTD THERMAL-COAL 120000 677373 29200
JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 405000 28900
JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 453000 40500
DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 339437 40700
TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 293400 44000
TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 137200 37000
TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 174900 44000
BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 92900 14100
BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23700 34300
KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 27600 48300
CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2530300 23900
BHANDARDRA HEP -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 2475 54900
SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 161400 26500
SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 445000 39000
SOTHERN REGION
CENTRAL SECTOR
NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 325699 54820
NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 305532 39880
NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 998805 38510
NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 113016 54070
NEYVELI TAMILNADU POWER LTD JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 625274 42200
VALLUR TPS NTPC TECL THERMAL-COAL 150000 856438 42350
R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 1493 84300
RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1502919 29400
RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 341291 31800
SIMHADRI I NTPC LTD THERMAL-COAL 100000 688382 36800
SIMHADRI II NTPC LTD THERMAL-COAL 100000 663657 43400
KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 593110 31324
MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 291625 21764
KKNPP-1 amp 2 NPCIL NUCLEAR-NUCLEAR 200000 572609 40948
MINICOY LAKSHADEEP THERMAL-DIESEL 340 770 29600
KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1097 29600
AMINI LAKSHADEEP THERMAL-DIESEL 265 509 29600
ANDROTT LAKSHADEEP THERMAL-DIESEL 219 524 29600
KALPENI LAKSHADEEP THERMAL-DIESEL 175 356 29600
AGATTI LAKSHADEEP THERMAL-DIESEL 195 658 29600
KADMAT LAKSHADEEP THERMAL-DIESEL 190 414 29600
KILTAN LAKSHADEEP THERMAL-DIESEL 150 269 29600
CHETLET LAKSHADEEP THERMAL-DIESEL 100 139 29600
BITRA LAKSHADEEP THERMAL-DIESEL 043 024 29600
BANGARAM LAKSHADEEP THERMAL-DIESEL 018 009 29600
Page 37
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) STATE SECTOR
Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 721811 46500
Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 50000 336142 46500
RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 237358 46500
RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 239926 46500
RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 124500 46500
SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 62109 46500
UPPER SILERU APGENCO HYDRO-HYDRO 24000 33000 46500
LOWER SILERU APGENCO HYDRO-HYDRO 46000 81066 46500
DONKARAI APGENCO HYDRO-HYDRO 2500 6007 46500
PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 1262 46500
CHETTIPETA APGENCO HYDRO-HYDRO 100 214 46500
MUCHKUND APGENCO HYDRO-HYDRO 12000 37571 46500
NAGARJUNASAGAR RCPH APGENCO HYDRO-HYDRO 9000 606 46500
TUNGABHADRA HES amp HAMPI(AP
Share)
APGENCO HYDRO-HYDRO 7200 6100 46500
KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 352232 42600
KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 288131 32500
KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 319272 46500
RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 40073 44300
KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 308317 46000
KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 308963 51300
SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 61004 76600
NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 17960 75300
PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 20873 58300
POCHAMPAD-I TSPGENCO HYDRO-HYDRO 2700 5455 29800
POCHAMPAD-II TSPGENCO HYDRO-HYDRO 900 1932 40700
NIZAMSAGAR TSPGENCO HYDRO-HYDRO 1000 1126 53400
RAICHUR TPS 1 to 7 KPCL THERMAL-COAL 147000 890866 43800
RAICHUR TPS 8 KPCL THERMAL-COAL 25000 159523 48200
BELLARI TPS 1 KPCL THERMAL-COAL 50000 318679 51100
BELLARI TPS 2 KPCL THERMAL-COAL 50000 232347 55600
BELLARI TPS 3 KPCL THERMAL-COAL 70000 47565 34400
BHADRA PH KPCL HYDRO-HYDRO 3920 2369 45900
GERUSUPPA PH KPCL HYDRO-HYDRO 24000 26990 22000
GHAT PRABHA HEP KPCL HYDRO-HYDRO 3200 4777 25300
KADRA HPS KPCL HYDRO-HYDRO 15000 16889 26800
NAGJHARI KPCL HYDRO-HYDRO 90000 155159 9800
KODASALLI DPH KPCL HYDRO-HYDRO 12000 14854 19200
MUNIRA+MGH+SPH+SPH KPCL HYDRO-HYDRO 22640 48211 7900
SHARAVATHY HPS KPCL HYDRO-HYDRO 108550 276215 5400
ALMATTI DPH KPCL HYDRO-HYDRO 29000 39611 24600
VARAHI UGPH KPCL HYDRO-HYDRO 46000 71368 15600
IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 17196 15300
IDUKKI HPS KSEB HYDRO-HYDRO 78000 137905 15300
KAKKAD HPS KSEB HYDRO-HYDRO 5000 13063 15300
KALLADA HPS KSEB HYDRO-HYDRO 1500 4436 15300
KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 46544 15300
KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 635 15300
LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 30822 15300
MALANKARA HPS KSEB HYDRO-HYDRO 1050 2474 15300
MATTUPETTY KSEB HYDRO-HYDRO 200 230 15300
MALAMPUZHA KSEB HYDRO-HYDRO 250 063 15300
CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 864 15300
URUMI ST I amp II KSEB HYDRO-HYDRO 615 903 15300
LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 248 15300
NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7765 19625 15300
PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 16601 15300
PANNIAR HPS KSEB HYDRO-HYDRO 3240 6217 15300
PORINGALKUTHU KSEB HYDRO-HYDRO 3600 10052 15300
PORINGALKUTHU LBE KSEB HYDRO-HYDRO 1600 9438 15300
PEPPARA KSEB HYDRO-HYDRO 300 395 15300
POOZHITHODE KSEB HYDRO-HYDRO 480 1045 15300
Page 38
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) PEECHI KSEB HYDRO-HYDRO 125 040 15300
RANI-PERUNADU KSEB HYDRO-HYDRO 400 585 15300
SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 79783 15300
SENGULAM HPS KSEB HYDRO-HYDRO 5120 11558 15300
SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 16711 15300
VILANGAD KSEB HYDRO-HYDRO 750 1578 15300
BARAPOLE KSEB HYDRO-HYDRO 1500 1932 15300
VELLATHOOVAL KSEB HYDRO-HYDRO 360 305 15300
CHIM0NY KSEB HYDRO-HYDRO 250 156 15300
ADYANPARA KSEB HYDRO-HYDRO 350 501 15300
BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 554 15300
KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 3801 15300
KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 23132 32800
ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 14416 62280
METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 523970 62280
METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 321270 62280
NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 336575 62280
NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 591240 62280
TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 508966 62280
KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 30897 62280
VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 18720 90699 62280
KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 33593 62280
BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 1047 62280
PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 1250 62280
PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 330 62280
MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 4897 62280
MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 032 62280
KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15681 62280
KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 40608 62280
KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 21342 62280
KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 4717 62280
KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4322 62280
KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2399 62280
METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 4416 62280
METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 8035 62280
BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2187 62280
BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2359 62280
BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2511 62280
BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 1949 62280
BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 1819 62280
POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 172 62280
SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 241 62280
MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 026 62280
THIRUMOORTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 136 62280
PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 9309 62280
VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 353 62280
SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 4192 62280
PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 6571 62280
SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 1186 62280
SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6319 62280
ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 6122 62280
KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 28674 62280
SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 18381 62280
SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 4258 62280
KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 12680 62280
KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4201 62280
ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 000 62280
PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 19175 62280
AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 078 62280
BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 504 62280
BHAVANI KATTALAI (BKB)(IIIampIII BB I amp II)TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 5847 62280
PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 000 62280
Page 39
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) SRI DAMODARAM STPS APPDCL THERMAL-COAL 160000 808108 36300
PRIVATE SECTOR
KARUPPUR TANJORE LANCO TANJORE PCL THERMAL-GAS 12000 48096 28770
SIMHAPURI ENERGY LTD SIMHAPURI ENERGY LTD THERMAL-COAL 60000 143900 39100
JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 7111 45500
SBU 1 JSW ENERGY LTD
VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 26000 159100
43300
SBU 2 JSW ENERGY LTD
VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 60000 247900
42800
LANCO KPLLANCO KONDAPALLI POWER
LTDTHERMAL-GAS 36814 85060
25776
LANCO KPL STG -IILANCO KONDAPALLI POWER
LTDTHERMAL-GAS 36600 12979
46330
LANCO KPL STG -IIIALANCO KONDAPALLI POWER
LTDTHERMAL-GAS 37100 85710
46330
LANCO KPL STG -III BLANCO KONDAPALLI POWER
LTDTHERMAL-GAS 37100 43639
46330
HINDUJA NATIONAL PCL HINDUJA NATIONAL PCL THERMAL-COAL 104000 303000 38200
MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 121164 49940
UDUPI POWER COR LTD ADANI POWER LTD THERMAL-COAL 120000 754613 42500
SPECTRUM POWER GENERATION
LTD SPECTRUM PG LTD THERMAL-GASN 20525 9256812
34952
TAQA NEYVELI POWER COM PVT
LTD TAQA NEYVELI THERMAL-LIG 25000 5840
34500
ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 251000 51000
ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 207860 36800
GMR VEMAGIRI POWER GENERATION
LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 30117
46450
EASTERN REGION
CENTRAL SECTOR
MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 64675 53113
MTPS STAGE - II KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 39000 1432 69138
BOKARO `B` TPS DVC THERMAL-COAL 63000 145670 31539
MEJIA TPS U 1-3 DVC THERMAL-COAL 63000 348298 31552
MEJIA TPS U 4 DVC THERMAL-COAL 21000 116099 34997
MEJIA TPS U 5-6 DVC THERMAL-COAL 50000 276427 35976
MEJIA TPS U 7-8 DVC THERMAL-COAL 100000 552854 36991
DURGAPUR STEEL TPS DVC THERMAL-COAL 100000 665550 39323
DURGAPUR TPS DVC THERMAL-COAL 21000 59270 35416
RAGHUNATHPUR TPS DVC THERMAL-COAL 120000 201650 35326
MAITHON HYDEL STA DVC HYDRO-HYDRO 6320 12200 17984
CHANDRAPURA TPSU1-3 DVC THERMAL-COAL 42000 257610 35095
CHANDRAPURA TPSU7-8 DVC THERMAL-COAL 50000 306673 34987
KODERMA TPS DVC THERMAL-COAL 100000 380180 38131
PANCHET HPS DVC HYDRO-HYDRO 8000 13360 17984
TILLAYA HPS DVC HYDRO-HYDRO 400 1410 17984
RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34700 35400
TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 277300 23200
TLDP -III NHPC LTD HYDRO-HYDRO 13200 55400 62000
TLDP -IV NHPC LTD HYDRO-HYDRO 16000 60300 25600
FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 957219 33700
FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 308943 41000
BONGAINGAON TPS NTPC LTD THERMAL-COAL 25000 153663 58600
KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 542277 34200
KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 942591 34200
BARH-II NTPC LTD THERMAL-COAL 132000 728021 44500
TALCHER TPS NTPC LTD THERMAL-COAL 46000 335521 30100
TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 702319 25600
TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1436521 24700
STATE SECTOR
BTPS(RampM) BIHAR STATE PGCL THERMAL-COAL 22000 12142 39700
BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 98331 10602
HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 50593 9482
CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 19689 2605
RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 53192 6033
UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 147208 14637
Page 40
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 60353 4519
IB TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 288567 25000
J P H GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 210 038 61100
MEYONG CHU GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 400 1086 61100
TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 122667 38200
DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 214339 43321
KOLAGHAT THERMAL POWER
STATION
WEST BENGAL PDCL THERMAL-COAL 126000 538269 31603
BAKRESHWAR THERMAL POWER
PLANT
WEST BENGAL PDCL THERMAL-COAL 105000 634876 32154
BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 45000 166855 33299
SANTHALDIH THERMAL POWER
STATION
WEST BENGAL PDCL THERMAL-COAL 50000 336442 34932
SAGARDIGHI THERMAL POWER
PROJECT
WEST BENGAL PDCL THERMAL-COAL 160000 423121 34705
JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 20344 68900
RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 24559 68900
TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 4623 68900
PURULIA PUMPED STORAGE
PROJECT
WEST BENGAL SEDCL HYDRO-HYDRO 90000 108816 68900
MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2768 68900
PRIVATE SECTOR
CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 49474 20230
CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 555500 70200
HALDIA ENERGY HALDIA ENERGY LTD THERMAL-COAL 60000 371000 50400
DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3688 63400
KAMALANGA TPS GMR KAMALANGA ENERGY LTD THERMAL-COAL 105000547670
33300
ADHUNIK POWER U-1 ADHUNIK POWER THERMAL-COAL 27000 158 44060
ADHUNIK POWER U-2 ADHUNIK POWER THERMAL-COAL 27000 168 44250
VL-JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 332800 23622
JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 43000 45250
JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 71700 37030
JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 70700 35920
JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 71100 38870
JOJOBERA UNIT 5 TATA POWER COM LTD THERMAL-COAL 12000 79300 44560
JOJOBERA UNIT 6 TATA POWER COM LTD THERMAL-WHR 12000 83700 12840
IEL KALINGANAGAR U-I TATA POWER COM LTD THERMAL-WG 6750 33400 22500
IEL KALINGANAGAR U-II TATA POWER COM LTD THERMAL-WG 6750 34800 22500
MAITHON UNIT 1 amp 2 TATA POWER COM LTD THERMAL-COAL 105000 678000 36100
HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 27500 24340
HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 28400 24340
HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 15800 24310
NORTH EASTERN REGION
CENTRAL SECTOR
LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 74100 36600
AGARTALA GT NEEPCO THERMAL-GAS 13500 88611 27210
ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 153111 32310
DOYANG HEP NEEPCO HYDRO-HYDRO 7500 25598 49801
KOPILI HEP NEEPCO HYDRO-HYDRO 20000 98186 11491
KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 19582 20237
KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 10310 17968
RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 124093 22945
TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 10100 17344 39000
STATE SECTOR
HYDRO POWER (122 Stns) ITANAGAR GOVT OF ARUNACHAL
PRADESHHYDRO-HYDRO 6971 6217270
24600
KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39514 17337
LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 82327 36810
NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 33318 48290
MYNTRIANG SHEP ST II ASSAM POWER GENCO HYDRO-HYDRO 300 567 35776
LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 9130 49200
LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 012 49200
DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 022 49200
TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 000 49200
UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 4990 16000
UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 6476 37000
UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 16494 14600
UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 3600 9556 15000
SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 758 8000
MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44070 44800
KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 154 41400
TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 091 41400
MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 411 41400
MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 394 41400
KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 760 41400
SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 3264 41400
LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 044 41400
BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 18953 28000
ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 43585 28200
GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 4080 11100
Note
LIG Lignite N Naptha WHR Waste Heat Recovery
Page 41
Bihar DVC Jharkhand Odisha West Bengal Sikkim AampN Island
Apr-2018 0 39 0 0 7 0 4
Apr-2019 0 0 0 0 0 0 4
Arunachal Assam Manipur Meghalaya Mizoram Nagaland Tripura
Apr-2018 5 30 7 0 9 29 4
Apr-2019 3 45 9 0 3 26 1
9
0 0 0 0 0 0
4
0
39
0 0
7
0
4
01020304050
Bih
ar
DV
C
Jha
rkh
an
d
Od
ish
a
We
st
Be
ng
al
Sik
kim
Aamp
NIs
land
MW
Eastern States (MW) Apr-2019 Apr-2018
3
45
9
0 3
26
1
5 7
0
9
29
4
0
10
20
30
40
50
Aru
na
cha
l
Assa
m
Ma
nip
ur
Me
gh
ala
ya
Miz
ora
m
Na
gala
nd
Trip
ura
MW
North-Eastern States (MW)
Sector Apr-2018 Apr-2019
Central 7634 7459
State 6438 6142
Private Sector IPP 5525 6005
Private Sector UTL 6815 6440
ALL INDIA 6454 6471
Month PLF 2018 PLF 2019
Jan 6215 6054
Feb 6230 6051
March 6452 6340
April 6454 6471
For Coal and Lignite based Power Plants and Provisional based on Actual-Cum-Assesment
10
PLF of Thermal Power Plants
(excluding gas based power plants)
All India PLF of Thermal Plants (Excluding Gas Based Plants) Month-wise
10 All India Thermal PLF Sector-wise (Excluding Gas Based Power Plants) for Apr-2019
5800
6000
6200
6400
6600
Jan Feb March April
Months
All India PLF Month-wise
PLF 2018 PLF 2019
7634
64385525
6815 6454
7459
6142 60056440 6471
000
2000
4000
6000
8000
10000
Central State Private Sector IPP Private Sector UTL ALL INDIA
All India Thermal PLF
Apr-2018 Apr-2019
2012-13 2013-14 2014-15 2015-16 2016-17 2017-18
TampD Losses 2304 2284 2277 2181 2142 2104
ATampC Losses 2548 2262 2572 2398 NA NA
Provisional
Note As per PFC for utilities selling directly to consumers NA- Not Available
Total Number of Villages
597464
Note From the year 2004-05 onwards Definition of Village Electrification-
A village would be declared Electrified if
Without
Subsidy
Gap ACS-
ARR(
Without
Subsidy)
Paiseunit
Gap ACS-
ARR (on
subsidy
booked
basis)
paiseunit
Gap ACS-
ARR (on
subsidyrece
ived basis)
paiseunit
2013-14 400 118 76 77
2014-15 412 108 58 60
Source- PFC Reports on the performance of State Power Utilities
2013-14 4894
2014-15 5304
2015-16 5459
2016-17 5743
2017-18 6080
2018-19 6289
11
11 T amp D and ATampC Losses ()
12 All India Village Electrification
Villiages Electrified (Nos)
10000All villages as per census 2011 has
been electrified on 28042018
Villages electrified
Average cost of supply(ACS)
(paiseunit)
i) Basic Infrastructure such as Distribution Transformer and Distribution lines are provided in the inhabited locality
as well as Dalit Basti hemlet where it exists (For electrification through Non-Conventional Energy Sources a
Distribution Transformer may not be necessary)
14 All India Coal consumption for Power Generation (MT)
520
Average Revenue Realization(paiseunit)
518
Year
ii) Electricity is provided to Public places like Schools Panchayat Office Health Centre Dispensaries Community
Centres etc and
iv) Mandatory Certification from Gram Panchayat regarding the completion of village electrification should be
obtained
13 Average cost of Power amp Average Realisation
iii) The number of households electrified should be at least 10 of the total number of households in the village
SN Contents Page
1 Capacity Addition Targets and Achievements in 12th Plan amp upto March2019 12
2 Capacity Addition Targets amp Achievements during Apr-2019 and Apr-19 to Apr-19 13
3 Installed Capacity in various Regions including their shares 14-19
Section B - Capacity Addition
(i) CAPACITY ADDTION TARGETS AND ACHIEVEMENTS IN THE 12TH PLAN Figures in MW
TARGET ACH TARGET ACH TARGET ACH TARGET ACH
CENTRAL 14878 15869 6004 2584 5300 2000 26182 20453
STATE 13922 22201 1608 2276 0 0 15530 24477
PRIVATE 43540 53661 3285 619 0 0 46825 54280
ALL INDIA 72340 91730 10897 5479 5300 2000 88537 99209
(ii) CAPACITY ADDITION TARGET AND ACHIEVEMENT FOR 2017-18 (IN MW)
THERMAL HYDRO NUCLEAR
TARGET ACH TARGET ACH TARGET ACH TARGET ACH
CENTRAL 4880 3170 800 390 500 6180 3560
STATE 3546 1760 300 200 0 3846 1960
PRIVATE 2940 3780 205 205 0 3145 3985
ALL INDIA 11366 8710 1305 795 500 0 13171 9505
(iii) CAPACITY ADDITION ACHIEVEMENT FOR 2018-19 (IN MW)
TARGET ACH TARGET ACH TARGET ACH TARGET ACH
CENTRAL 2760 1960 710 110 0 0 3470 2070
STATE 4506 2850 130 30 0 0 4636 2880
PRIVATE 0 972 0 0 0 0 0 972
ALL INDIA 7266 5782 840 140 0 0 8106 5922
12
SECTOR
SECTOR
TOTAL
TOTALNUCLEARHYDROTHERMAL
1 Capacity Addtion Targets and Achievements in the 12th Plan amp upto March2019
SECTORTHERMAL HYDRO NUCLEAR TOTAL
(MW)
Cummulative
Deviation
Target Achievement Target Achievement (+) (-)
Central 6040 500 0 500 0 -500
State 425615 660 0 660 0 -660
Private 0 0 0 0 0 0
Total 1029615 1160 0 1160 0 -1160
Central 600 0 0 0 0 0
State 21099 0 0 0 0 0
Private 379 0 0 0 0 0
Total 118999 0 0 0 0 0
Nuclear Central 700 0 0 0 0 0
Central 7340 500 0 500 0 -500
State 446714 660 0 660 0 -660
Private 379 0 0 0 0 0
Total 1218614 1160 0 1160 0 -1160
Electricity Generation (MU) Targets and Achievements for 2016-17
13
Hydro
All India
Capacity Addition TargetsAchievements during the Month of Apr-2019
Thermal
2 Capacity Addition Targets Achievements During Apr-2019
Schemes Sector
Target 2019-20
Apr-19 to Apr-19Apr-19
11
60
0 0
11
60
0 0 0 0
0
200
400
600
800
1000
1200
1400
Thermal Hydro Nuclear Total
MW
Targets and Achievement during 2019-20Target Achievement
0
200
400
600
800
1000
1200
Thermal Hydro Nuclear Total
1160
0 0
1160
0 0 00
MW
Target Achievement
Coal Lignite Gas Diesel Total
State 1634400 25000 287920 000 1947320 000 869755 69956 2887031
Private 2168083 108000 55800 000 2331883 000 251400 1312046 3895329
Central 1233537 25000 234406 000 1492943 162000 849622 37900 2542465
Sub Total 5036020 158000 578126 000 5772146 162000 1970777 1419902 9324825
State 2156000 104000 284982 000 2544982 000 544650 54789 3144421
Private 3474567 50000 467600 000 3992167 000 48100 2186476 6226743
Central 1650295 000 328067 000 1978362 184000 162000 66630 2390992
Sub Total 7280862 154000 1080649 000 8515511 184000 754750 2307894 11762155
State 1993250 000 79198 28788 2101236 000 1177483 58688 3337407
Private 1187450 25000 532210 27370 1772030 000 000 3749140 5521170
Central 1123502 289000 35958 000 1448460 332000 000 54190 1834650
Sub Total 4304202 314000 647366 56158 5321726 332000 1177483 3862018 10693227
State 624000 000 10000 000 634000 000 353792 27511 1015303
Private 638700 000 000 000 638700 000 39900 111637 790237
Central 1483664 000 000 000 1483664 000 100520 1000 1585184
Sub Total 2746364 000 10000 000 2756364 000 494212 140148 3390724
State 000 000 49771 3600 53371 000 42200 23325 118895
Private 000 000 2450 000 2450 000 000 6104 8554
Central 77002 000 125360 000 202362 000 100500 3000 305862
Sub Total 77002 000 177581 3600 258183 000 142700 32429 433311
State 000 000 000 4005 4005 000 000 525 4530
Private 000 000 000 000 000 000 000 738 738
Central 000 000 000 000 000 000 000 510 510
Sub Total 000 000 000 4005 4005 000 000 1773 5778
State 6407650 129000 711871 36393 7284913 000 2987880 234793 10507586
Private 7468800 183000 1058060 27370 8737230 000 339400 7366140 16442770
Central 5568000 314000 723791 000 6605791 678000 1212642 163230 8659663
Total 19444450 626000 2493722 63763 22627934 678000 4539922 7764163 35610019
Figures at decimal may not tally due to rounding off
Note -
(As per latest information available with MNRE)
Break up of RES all India as on 31032019 is given below (in MW)
459315 3562597 2818071 7764163
A 0 MW
B Apr 2019 0 MW
C
Apr 2019 0 MW
D Net Capacity Added during Apr 2019 A-B-C 0 MW
Sector wise breakup of RES capacity as shown is provisional
Share of installed capacity of BBMB Stations is included in state sector of partner states
BM PowerCogen Waste to Energy
910350 13830
Capacity Added during Apr 2019
Capacity Retired during
Capacity removed due to change
from Conventional to RES during
Islands
ALL INDIA
Abbreviation- SHP=Small Hydro Project (le 25 MW) BP=Biomass Power UampI=Urban amp Industrial Waste Power RES=Renewable Energy Sources
1 RES include SHP BP UampI Solar and Wind Energy Installed capacity in respect of RES (MNRE) as on 31032019
Small
Hydro PowerWind Power
Bio-PowerSolar Power
Total
Capacity
RES
(MNRE)
Northern Region
Western Region
Southern Region
Eastern Region
North Eastern
Region
ALL INDIA INSTALLED CAPACITY (IN MW) OF POWER STATIONS
(As on 30042019)
(UTILITIES)
Region Ownership Sector
Mode wise breakup
Grand TotalThermalNuclear Hydro
Coal Lignite Gas Diesel Total
State 13500 000 180040 000 193540 000 000 000 193540
Private 86922 000 10800 000 97722 000 000 17889 115611
Central 311272 000 20701 000 331973 10283 72309 000 414565
Sub-Total 411694 000 211541 000 623235 10283 72309 17889 723716
State 272000 000 15000 000 287000 000 110282 6930 404212
Private 408078 000 000 000 408078 000 20000 34512 462590
Central 129472 000 53561 000 183034 10094 66370181 500 259998
Sub-Total 809550 000 68561 000 878112 10094 196652 41942 1126799
State 000 000 000 000 000 000 69460 25661 95121
Private 000 000 000 000 000 000 99200 62668 161868
Central 18340 000 6201 000 24541 2895 122388 000 149824
Sub-Total 18340 000 6201 000 24541 2895 291048 88329 406813
State 000 000 17500 000 17500 000 123000 12903 153403
Private 000 000 000 000 000 000 000 6483 6483
Central 50639 000 12907 000 63547 6798 109188 000 179533
Sub-Total 50639 000 30407 000 81047 6798 232188 19386 339419
State 176000 000 15000 000 191000 000 259770 12780 463550
Private 511550 000 000 000 511550 000 28800 115462 655812
Central 85458 000 26401 000 111859 19681 92342 000 223882
Sub-Total 773008 000 41401 000 814409 19681 380912 128242 1343244
State 626000 25000 60380 000 711380 000 109618 2385 823383
Private 280200 108000 000 000 388200 000 10400 730181 1128781
Central 95625 25000 22110 000 142735 55674 73901 34400 306710
Sub-Total 1001825 158000 82490 000 1242315 55674 193919 766966 2258874
State 546900 000 000 000 546900 000 72410 2510 621820
Private 871433 000 000 000 871433 000 84200 288760 1244393
Central 379639 000 54949 000 434588 28948 180253 3000 646789
Sub-Total 1797972 000 54949 000 1852921 28948 336863 294270 2513002
State 000 000 000 000 000 000 125215 6787 132002
Private 9900 000 45000 000 54900 000 8800 52620 116320
Central 34324 000 6966 000 41290 3124 47554 000 91968
Sub-Total 44224 000 51966 000 96190 3124 181569 59407 340290
State 000 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 000 3471 3471
Central 3815 000 1503 000 5317 801 10171 000 16289
Sub-Total 3815 000 1503 000 5317 801 10171 3471 19760
124953 000 29105 000 154058 23703 75145 000 252907
State 1634400 25000 287920 000 1947320 000 869755 69956 2887031
Private 2168083 108000 55800 000 2331883 000 251400 1312046 3895329
Central 1233537 25000 234406 000 1492943 162000 849622 37900 2542465
Grand Total 5036020 158000 578126 000 5772146 162000 1970777 1419902 9324825
Delhi
Haryana
Himachal Pradesh
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
NORTHERN REGION
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
(As on 30042019)
State Ownership Sector
Mode wise breakup
Grand TotalThermalNuclear Hydro
RES
(MNRE)
Jammu amp Kashmir
Punjab
Rajasthan
Uttar Pradesh
Uttarakhand
Chandigarh
Central - Unallocated
Total (Northern
Region)
(As on 30042019)
Coal Lignite Gas Diesel Total
State 000 000 000 000 000 000 000 005 005
Private 000 000 4800 000 4800 000 000 392 5192
Central 46959 000 1967 000 48926 2600 000 000 51526
Sub-Total 46959 000 6767 000 53726 2600 000 397 56723
State 000 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 000 1447 1447
Central 14141 000 4334 000 18475 700 000 000 19175
Sub-Total 14141 000 4334 000 18475 700 000 1447 20622
State 371000 104000 217782 000 692782 000 77200 6470 776452
Private 726567 50000 396000 000 1172567 000 000 833180 2005747
Central 324243 000 42400 000 366643 55900 000 24330 446873
Sub-Total 1421810 154000 656182 000 2231992 55900 77200 863980 3229072
State 540000 000 000 000 540000 000 170366 8396 718762
Private 617400 000 10000 000 627400 000 000 418040 1045440
Central 334238 000 25700 000 359938 27300 152000 30000 569238
Sub-Total 1491638 000 35700 000 1527338 27300 322366 456436 2333440
State 228000 000 000 000 228000 000 12000 1105 241105
Private 885000 000 000 000 885000 000 000 52430 937430
Central 211075 000 000 000 211075 4800 10000 000 225875
Sub-Total 1324075 000 000 000 1324075 4800 22000 53535 1404410
State 1017000 000 67200 000 1084200 000 285084 38813 1408097
Private 1245600 000 56800 000 1302400 000 48100 880441 2230941
Central 466780 000 227273 000 694053 69000 000 12300 775353
Sub-Total 2729380 000 351273 000 3080653 69000 333184 931553 4414390
State 000 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 000 546 546
Central 19560 000 6634 000 26194 900 000 000 27094
Sub-Total 19560 000 6634 000 26194 900 000 546 27640
233300 000 19759 000 253059 22800 000 000 275859
State 2156000 104000 284982 000 2544982 000 544650 54789 3144421
Private 3474567 50000 467600 000 3992167 000 48100 2186476 6226743
Central 1650295 000 328067 000 1978362 184000 162000 66630 2390992
Grand Total 7280862 154000 1080649 000 8515511 184000 754750 2307894 11762155
Goa
Daman amp Diu
Gujarat
Madhya Pradesh
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
WESTERN REGION
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
ThermalNuclear Hydro
RES
(MNRE)
State Ownership Sector
Mode wise breakup
Grand Total
Chhattisgarh
Maharashtra
Dadra amp Nagar
Naveli
Central - Unallocated
Total (Western
Region)
(As on 30042019)
Coal Lignite Gas Diesel Total
State 501000 000 23540 000 524540 000 167360 5618 697518
Private 387388 000 381318 3680 772386 000 000 743342 1515728
Central 154683 12773 000 000 167456 12727 000 25000 205183
Sub-Total 1043071 12773 404858 3680 1464382 12727 167360 773960 2418429
State 558250 000 000 000 558250 000 247993 4122 810365
Private 83945 000 83182 000 167127 000 000 393644 560771
Central 180685 14927 000 000 195612 14873 000 1000 211485
Sub-Total 822880 14927 83182 000 920989 14873 247993 398766 1582621
State 502000 000 000 12792 514792 000 358660 19389 892841
Private 195850 000 000 2520 198370 000 000 1363591 1561961
Central 242780 40140 000 000 282920 69800 000 000 352720
Sub-Total 940630 40140 000 15312 996082 69800 358660 1382979 2807521
State 000 000 000 15996 15996 000 185650 17290 218936
Private 61500 000 17400 000 78900 000 000 19021 97921
Central 86142 28180 35958 000 150280 36200 000 5000 191480
Sub-Total 147642 28180 53358 15996 245176 36200 185650 41311 508337
State 432000 000 52408 000 484408 000 217820 12270 714498
Private 458767 25000 50310 21170 555247 000 000 1229228 1784475
Central 302532 136420 000 000 438952 144800 000 23190 606942
Sub-Total 1193299 161420 102718 21170 1478607 144800 217820 1264688 3105915
State 000 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 000 000 000
Central 000 10000 000 000 10000 000 000 000 10000
Sub-Total 000 10000 000 000 10000 000 000 000 10000
State 000 000 3250 000 3250 000 000 000 3250
Private 000 000 000 000 000 000 000 314 314
Central 14080 10760 000 000 24840 8600 000 000 33440
Sub-Total 14080 10760 3250 000 28090 8600 000 314 37004
142600 35800 000 000 178400 45000 000 000 223400
State 1993250 000 79198 28788 2101236 000 1177483 58688 3337407
Private 1187450 25000 532210 27370 1772030 000 000 3749140 5521170
Central 1123502 289000 35958 000 1448460 332000 000 54190 1834650
Grand Total 4304202 314000 647366 56158 5321726 332000 1177483 3862018 10693227
Kerala
Andhra Pradesh
Telangana
Karnataka
Total (Southern
Region)
Tamil Nadu
NLC
Puducherry
Central - Unallocated
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
SOUTHERN REGION
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
State Ownership Sector
Mode wise breakup
Grand TotalThermalNuclear Hydro
RES
(MNRE)
(As on 30042019)
Coal Lignite Gas Diesel Total
State 000 000 000 000 000 000 000 7070 7070
Private 28100 000 000 000 28100 000 000 25545 53645
Central 384933 000 000 000 384933 000 11000 000 395932
Sub-Total 413033 000 000 000 413033 000 11000 32615 456647
State 42000 000 000 000 42000 000 13000 405 55405
Private 73000 000 000 000 73000 000 000 3495 76495
Central 39374 000 000 000 39374 000 6100 000 45474
Sub-Total 154374 000 000 000 154374 000 19100 3900 177374
State 540000 000 10000 000 550000 000 98600 12195 660795
Private 243700 000 000 000 243700 000 000 35250 278950
Central 76077 000 000 000 76077 000 41000 000 117077
Sub-Total 859777 000 10000 000 869777 000 139600 47445 1056822
State 000 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 000 000 000
Central 698504 000 000 000 698504 000 18620 000 717124
Sub-Total 698504 000 000 000 698504 000 18620 000 717124
State 42000 000 000 000 42000 000 206192 2630 250822
Private 293900 000 000 000 293900 000 000 47346 341246
Central 163390 000 000 000 163390 000 8900 1000 173290
Sub-Total 499290 000 000 000 499290 000 215092 50976 765358
State 000 000 000 000 000 000 36000 5211 41211
Private 000 000 000 000 000 000 39900 001 39901
Central 8703 000 000 000 8703 000 6400 000 15103
Sub-Total 8703 000 000 000 8703 000 82300 5212 96215
112683 000 000 000 112683 000 8501 000 121184
State 624000 000 10000 000 634000 000 353792 27511 1015303
Private 638700 000 000 000 638700 000 39900 111637 790237
Central 1483664 000 000 000 1483664 000 100520 1000 1585184
Grand Total 2746364 000 10000 000 2756364 000 494212 140148 3390724
Total (Eastern
Region)
Bihar
Jharkhand
West Bengal
DVC
Odisha
Sikkim
Central - Unallocated
HydroOwnership Sector
Mode wise breakup
Grand TotalThermalNuclear
RES
(MNRE)
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
State
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
EASTERN REGION
(As on 30042019)
Coal Lignite Gas Diesel Total
State 000 000 32821 000 32821 000 10000 501 43322
Private 000 000 2450 000 2450 000 000 2650 5100
Central 40852 000 43556 000 84408 000 35708 2500 122616
Sub-Total 40852 000 78827 000 119679 000 45708 5651 171038
State 000 000 000 000 000 000 000 10711 10711
Private 000 000 000 000 000 000 000 2939 2939
Central 3705 000 4682 000 8387 000 11655 000 20042
Sub-Total 3705 000 4682 000 8387 000 11655 13650 33692
State 000 000 000 000 000 000 32200 3253 35453
Private 000 000 000 000 000 000 000 012 012
Central 4560 000 10969 000 15529 000 7227 000 22756
Sub-Total 4560 000 10969 000 15529 000 39427 3265 58221
State 000 000 16950 000 16950 000 000 1601 18551
Private 000 000 000 000 000 000 000 009 009
Central 5610 000 43695 000 49305 000 6849 500 56654
Sub-Total 5610 000 60645 000 66255 000 6849 2110 75214
State 000 000 000 3600 3600 000 000 545 4145
Private 000 000 000 000 000 000 000 344 344
Central 4710 000 7157 000 11867 000 9534 000 21401
Sub-Total 4710 000 7157 3600 15467 000 9534 889 25890
State 000 000 000 000 000 000 000 3067 3067
Private 000 000 000 000 000 000 000 100 100
Central 3210 000 4893 000 8103 000 5733 000 13836
Sub-Total 3210 000 4893 000 8103 000 5733 3167 17003
State 000 000 000 000 000 000 000 3647 3647
Private 000 000 000 000 000 000 000 050 050
Central 3105 000 4046 000 7151 000 9794 000 16945
Sub-Total 3105 000 4046 000 7151 000 9794 3697 20642
11250 000 6362 000 17612 000 14000 000 31612
State 000 000 49771 3600 53371 000 42200 23325 118895
Private 000 000 2450 000 2450 000 000 6104 8554
Central 77002 000 125360 000 202362 000 100500 3000 305862
Grand Total 77002 000 177581 3600 258183 000 142700 32429 433311
Assam
Arunachal Pradesh
Meghalaya
Tripura
Manipur
Nagaland
Mizoram
Central - Unallocated
Total (North-
Eastern Region)
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
NORTH-EASTERN REGION
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
State Ownership Sector
Mode wise breakup
Grand TotalThermalNuclear Hydro
RES
(MNRE)
(As on 30042019)
Coal Lignite Gas Diesel Total
State 000 000 000 4005 4005 000 000 525 4530
Private 000 000 000 000 000 000 000 663 663
Central 000 000 000 000 000 000 000 510 510
Sub-Total 000 000 000 4005 4005 000 000 1698 5703
State 000 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 000 075 075
Central 000 000 000 000 000 000 000 000 000
Sub-Total 000 000 000 000 000 000 000 075 075
State 000 000 000 4005 4005 000 000 525 4530
Private 000 000 000 000 000 000 000 738 738
Central 000 000 000 000 000 000 000 510 510
Grand Total 000 000 000 4005 4005 000 000 1773 5778
Andaman amp
Nicobar
Lakshadweep
Total (Islands)
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
ISLANDS
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
State Ownership Sector
Mode wise breakup
Grand TotalThermalNuclear Hydro
RES
(MNRE)
SrNo Contents Page
1 Executive summary of Target and Achievement of Transmission Lines during 2019-20
20(1)
2 List of Transmission Lines CommissionedReady for commissioning during Apr-2019 20(2)
Section C - Transmission Lines
1 Executive summary of Target and Achievement of Transmission Lines during 2019-20 As on 30-04-19
(All figures in circuit kms)
Ce
ntr
al S
ecto
r
Sta
te S
ecto
r
JV
Pri
va
te S
ecto
r
To
tal
Ce
ntr
al S
ecto
r
Sta
te S
ecto
r
JV
Pri
va
te S
ecto
r
To
tal
Ce
ntr
al S
ecto
r
Sta
te S
ecto
r
JV
Pri
va
te S
ecto
r
To
tal
Ce
ntr
al S
ecto
r
Sta
te S
ecto
r
JV
Pri
va
te S
ecto
r
To
tal
Ce
ntr
al S
ecto
r
Sta
te S
ecto
r
JV
Pri
va
te S
ecto
r
To
tal
Ce
ntr
al
Se
cto
r
Sta
te S
ec
tor
JV
Pri
va
te S
ec
tor
Gra
nd
To
tal
0 0 0 0 0 0 0 0 2727 958 2334 6019 2239 3416 1143 6798 781 10023 0 10804 5747 14397 3477 23621
Apr19 Programme 0 0 0 0 0 0 0 0 577 416 557 1550 60 890 203 1153 0 309 0 309 637 1615 760 3012
Achievement 0 0 0 0 0 0 0 0 53 0 0 53 0 20 0 20 0 401 0 401 53 421 0 474
Upto Apr-19 Programme 0 0 0 0 0 0 0 0 577 416 557 1550 60 890 203 1153 0 309 0 309 637 1615 760 3012
Achievement 0 0 0 0 0 0 0 0 53 0 0 53 0 20 0 20 0 401 0 401 53 421 0 474
20(1)
220 kV Grand Total 800 kV 500 kV
Programme 2019-20
Programme
Achievement
HVDC765 kV 400 kV
Line
1 2 3 4 5 6
1 400 Bhadla (PG) - Bhadla (RVPN) line DC PGCIL 53
53
2 400 LILO of one ckt Jhanor - Navsari at Vav Ss DC GETCO 20
3 220 Banda-Chitrakoot Line DC UPPTCL 226
4 220 Gorakhpur (PG)-Gola line DC UPPTCL 82
5 220 Hapur(765) - Faridnagar line SC UPPTCL 11
6 220 Kalikiri - Madanapalli line DC APTRANSCO 60
7 220LILO of Gr Noida -Noida Sec-129 at Noida
Sec-148DC UPPTCL 1
8 220LILO of one Ckt of Badshahpur Pali at Sec-
65 GurgaonDC HVPNL 3
9 220 Sultanpur-Sangipur LILO Section at Amethi DC UPPTCL 18
421
0
474
20(2)
Grand Total
2Transmission Lines (220 kV and above) CommissionedReady for commissioning During Apr-2019
Voltage
Level (kV)Name of Transmission Lines
Circuit
Type
Executing
Agency
CENTRAL SECTOR
Total of CENTRAL SECTOR
STATE SECTOR Sector
Total of STATE SECTOR
PRIVATE SECTOR
Total of PRIVATE SECTOR
SlNo
Length(CKm)
As on 30-04-19
SN Contents Page
1 Executive summary of Target and Achievement of Substations during 2019-20 21(1)
2Sub Stations (220 kV and above) commissionedready for commisssioning during Apr-
201921(2)
Section D - Sub Stations
1 Executive summary of Target and Achievement of Substations during 2019-2020 As on 30-04-19
(All figures in circuit MVA)
Ce
ntr
al S
ecto
r
Sta
te S
ecto
r
JV
Pri
va
te S
ecto
r
To
tal
Ce
ntr
al S
ecto
r
Sta
te S
ecto
r
JV
Pri
va
te S
ecto
r
To
tal
Ce
ntr
al S
ecto
r
Sta
te S
ecto
r
JV
Pri
va
te S
ecto
r
To
tal
Ce
ntr
al S
ecto
r
Sta
te S
ecto
r
JV
Pri
va
te S
ecto
r
To
tal
Ce
ntr
al S
ecto
r
Sta
te S
ecto
r
JV
Pri
va
te S
ecto
r
To
tal
Ce
ntr
al S
ec
tor
Sta
te S
ec
tor
JV
Pri
va
te S
ec
tor
Gra
nd
To
tal
3000 0 0 3000 0 0 0 0 18000 3000 6000 27000 5205 19665 4260 29130 800 21786 0 22586 27005 44451 10260 81716
Apr19 Programme 0 0 0 0 0 0 0 0 3000 0 3000 6000 0 1000 2000 3000 0 800 0 800 3000 1800 5000 9800
Achievement 0 0 0 0 0 0 0 0 500 0 0 500 815 1980 0 2795 0 1305 0 1305 1315 3285 0 4600
Upto Apr-19 Programme 0 0 0 0 0 0 0 0 3000 0 3000 6000 0 1000 2000 3000 0 800 0 800 3000 1800 5000 9800
Achievement 0 0 0 0 0 0 0 0 500 0 0 500 815 1980 0 2795 0 1305 0 1305 1315 3285 0 4600
21(1)
220 kV Grand Total 800 kV 500 kV
Programme 2019-20
Programme
Achievement
HVDC765 kV 400 kV
As on 30-04-19
Sl Voltage Ratio Capacity
No (kVkV) (MWMVA)
1 2 3 4 5
1 Bhadla SS (3x1500 3x500 MVA) 765400 PGCIL 500
2 Extn at Tumkur (Pavagada ) PS (2x500 MVA) 400220 PGCIL 500
3 Bongaigaon (2nd ICT) Ss 400220 PGCIL 315
Total of CENTRAL SECTOR 1315
4 Motiram Adda Gorakhpur (Aug) (Additional TF) 400220 UPPTCL 240
5 Muradnagar-II Ghaziabad (Aug) (Additional TF) 400220 UPPTCL 240
6 Noida Sec- 148 GBNagar (New) 400220 UPPTCL 5007 Sarnath Varanasi (Aug) TF- II (500-315) 400220 UPPTCL 1858 Sarojininagar Lucknow Aug) TF- II (500-315) 400220 UPPTCL 185
9 Unnao (Aug) TF-III 400220 UPPTCL 31510 Nawada SS 400220 HVPNL 31511 Kharepatan SS 22033 MSETCL 2512 Prathipadu SS 220132 APTRANSCO 10013 Pali Ss 22066 HVPNL 160
14 A-5 Faridabad Ss 22066 HVPNL 60
15 Rentachintala Ss Aug(3X100-2x100) 220132 APTRANSCO 10016 Amethi Ss 220132 UPPTCL 160
17 Gajokhar Varanasi (Aug) TF- II (160-100) 220132 UPPTCL 60
18 Gola Gorakhpur (New) 220132 UPPTCL 160
19 Khurja Bulandshahr (Aug) TF- II (200-160) 220132 UPPTCL 40
20 RC Green GB Nagar (Aug) TF-II (160-100) 220132 UPPTCL 60
21 Sikandrabad Bulandshahr (Aug) (Additional TF) 220132 UPPTCL 160
22 Sitapur (Aug) (Additional TF) 220132 UPPTCL 160
23 Sohawal Ayodhya (Aug) TF-II (160-100) 220132 UPPTCL 60
TOTAL STATE SECTOR 3285
GRAND TOTAL 4600
21(2)
CENTRAL SECTOR
STATE SECTOR
2Sub-Stations (220 kV and above) CommissionedReady for commissioning During Apr-2019
Name of Sub Stations Executing Agency
SN Contents Page
1 Electricity Generation (MU) Targets and Achievements for 2019-20 22
Section E - Electricity Generation
Programme Achievement Ach Programme Achievement Ach
Central Sector 37545100 3177900 3129530 9848 3177900 3129530 9848
State Sector 37498600 3322500 2950558 8881 3322500 2950558 8881
PvtIPP Sector 37346200 3236400 3195940 9875 3236400 3195940 9875
PvtUTL Sector 1823100 159300 165579 10394 159300 165579 10394
Total 114213000 9896100 9441607 9541 9896100 9441607 9541
Central Sector 5661700 386100 481390 12468 386100 481390 12468
State Sector 6680500 498200 536514 10769 498200 536514 10769
PvtIPP Sector 1206900 57300 80405 14032 57300 80405 14032
PvtUTL Sector 144100 12300 10930 8886 12300 10930 8886
Total 13693200 953900 1109239 11628 953900 1109239 11628
Central Sector 4472000 367300 317765 8651 367300 317765 8651
Total 4472000 367300 317765 8651 367300 317765 8651
Bhutan Import 621800 17500 24396 13941 17500 24396 13941
Central Sector 47678800 3931300 3928685 9993 3931300 3928685 9993
State Sector 44179100 3820700 3487072 9127 3820700 3487072 9127
Pvt Sector 40520300 3465300 3452854 9964 3465300 3452854 9964
Total 133000000 11234800 10893007 9696 11234800 10893007 9696
Provisional based on actual-cum-Assesment
Figs in MU
Cummulative
Achievement
Cummulative
Achievement
Mar-19 Mar-18 Upto Mar-2019 Upto Mar-2018
984785 869291 12675910 10183949
22
1 Electricity Generation (MU) Targets and Achievememts for 2019-20
All India Energy Generation During Apr-19 to Apr-19 (MU)
Target (2019-20)Apr-19 to Apr-19
Sector
Hydro
Thermal
Nuclear
Renewable Energy Generation
Achievement
Apr-2019
98961
95393673
112348
94416
11092
3178
108930
0
20000
40000
60000
80000
100000
120000
Thermal Hydro Nuclear Total
Programme
Achievement
SN Contents Page
1 Energy Power Supply Position (Provisional) for Apr-2019 and during Apr-19 to Apr-19 23
2 Peak Power Supply Position (Provisional) for Apr-2019 and during Apr-19 to Apr-19 24
3 Energy Power Supply Position (Revised) for Mar-2019 and during Apr-19 to Mar-19 25
4 Peak Power Supply Position (Revised) for Mar-2019 and during Apr-19 to Mar-19 26
5 Notified Power cuts Restrictions on Industries during Apr-2019 27
6 Power Supply to Agricultural Sector during Apr-2019 28
Section F - Power supply position
आकड़ मममलयन यननट नट Figures in MU net
ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied
कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )
चडीगढ़ Chandigarh 117 117 0 00 117 117 0 00
दिलली Delhi 2698 2698 1 00 2698 2698 1 00
हरियजणज Haryana 3773 3773 0 00 3773 3773 0 00
दहमजचल परिश Himachal Pradesh 777 777 0 00 777 777 0 00
रमम कशमीि Jammu amp Kashmir 1604 1296 308 192 1604 1296 308 192
परजब Punjab 3646 3646 0 00 3646 3646 0 00
िजरसथजन Rajasthan 6210 6208 2 00 6210 6208 2 00
उतति परिश Uttar Pradesh 10179 10148 32 03 10179 10148 32 03
उततिजखड Uttarakhand 1120 1120 0 00 1120 1120 0 00
उततरी कषतर Northern Region 30094 29786 308 10 30094 29786 308 10
छततीसगढ़ Chhattisgarh 2684 2676 8 03 2684 2676 8 03
गरिजत Gujarat 10718 10718 0 00 10718 10718 0 00
मधय परिश Madhya Pradesh 6006 6006 0 00 6006 6006 0 00
महजिजषटर Maharashtra 14308 14308 0 00 14308 14308 0 00
िमन औि दिउ Daman amp Diu 220 220 0 00 220 220 0 00
िजिि व नगि हवली Dadra amp Nagar Haveli 552 552 0 00 552 552 0 00
गोवज Goa 388 388 0 00 388 388 0 00
पशचिमी कषतर Western Region 34875 34868 8 00 34875 34868 8 00
आनधर परिश Andhra Pradesh 5708 5708 0 00 5708 5708 0 00
तलगजनज Telangana 5725 5725 0 00 5725 5725 0 00
कनजाटक Karnataka 7003 7003 0 00 7003 7003 0 00
किल Kerala 2402 2400 2 01 2402 2400 2 01
तममल नजड Tamil Nadu 10010 10010 0 00 10010 10010 0 00
पडचिी Puducherry 263 263 0 00 263 263 0 00
लकष-दवीप Lakshadweep 4 4 0 0 4 4 0 0
दकषकषणी कषतर Southern Region 31111 31109 2 00 31111 31109 2 00
बबहजि Bihar 2589 2589 0 00 2589 2589 0 00
िजमोिि घजटी ननगम DVC 1772 1772 0 00 1772 1772 0 00
झजिखणड Jharkhand 689 689 0 00 689 689 0 00
ओडडशज Odisha 2689 2689 1 00 2689 2689 1 00
पशशचम बगजल West Bengal 5075 5075 0 00 5075 5075 0 00
मसशककम Sikkim 37 37 0 00 37 37 0 00
अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 7 29 27 2 7
परवी कषतर Eastern Region 12851 12850 1 00 12851 12850 1 00
अरणजचल परिश Arunachal Pradesh 66 66 0 05 66 66 0 05
असम Assam 766 709 57 75 766 709 57 75
मणणपि Manipur 68 67 1 15 68 67 1 15
मघजलय Meghalaya 170 160 10 59 170 160 10 59
ममज़ोिम Mizoram 54 53 0 08 54 53 0 08
नजगजलड Nagaland 54 54 0 08 54 54 0 08
बिपिज Tripura 122 120 1 12 122 120 1 12
उततर-परवी कषतर North-Eastern Region 1300 1228 71 55 1300 1228 71 55
समपणण भारत All India 110231 109842 389 04 110231 109842 389 04
23
ऊरजा पनत ा म कमी ऊरजा पनत ा म कमीEnergy not Supplied
Excludes energy exported to Bangladesh
Energy not Supplied
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
ऊराण वरवदयत आपरत ण शथिरत ररपोरण (परवाणरवलोकन) Energy Power Supply Position Report (Provisional)
राजयState
अपरल 2019 April2019 अपरल2019 -अपरल2019 April2019 to April2019
अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met
कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )
चडीगढ़ Chandigarh 256 256 0 00 256 256 0 00
दिलली Delhi 5664 5664 0 00 5664 5664 0 00
हरियजणज Haryana 8127 8127 0 00 8127 8127 0 00
दहमजचल परिश Himachal Pradesh 1387 1387 0 00 1387 1387 0 00
रमम कशमीि Jammu amp Kashmir 2826 2261 565 200 2826 2261 565 200
परजब Punjab 7015 7015 0 00 7015 7015 0 00
िजरसथजन Rajasthan 10560 10560 0 00 10560 10560 0 00
उतति परिश Uttar Pradesh 19935 19935 0 00 19935 19935 0 00
उततिजखड Uttarakhand 1922 1922 0 00 1922 1922 0 00
उततरी कषतर Northern Region 54476 53985 491 09 54476 53985 491 09
छततीसगढ़ Chhattisgarh 4596 4574 22 05 4596 4574 22 05
गरिजत Gujarat 17871 17865 6 00 17871 17865 6 00
मधय परिश Madhya Pradesh 10018 10018 0 00 10018 10018 0 00
महजिजषटर Maharashtra 23158 23150 8 00 23158 23150 8 00
िमन औि दिउ Daman amp Diu 341 340 1 02 341 340 1 02
िजिि व नगि हवली Dadra amp Nagar Haveli 818 818 0 00 818 818 0 00
गोवज Goa 594 594 0 00 594 594 0 00
पशचिमी कषतर Western Region 56242 56222 20 00 56242 56222 20 00
आनधर परिश Andhra Pradesh 9151 9151 0 00 9151 9151 0 00
तलगजनज Telangana 10191 10191 0 00 10191 10191 0 00
कनजाटक Karnataka 12681 12681 0 00 12681 12681 0 00
किल Kerala 4309 4300 8 02 4309 4300 8 02
तममल नजड Tamil Nadu 15972 15972 0 00 15972 15972 0 00
पडचिी Puducherry 482 480 2 05 482 480 2 05
लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0
दकषकषणी कषतर Southern Region 49155 49103 52 01 49155 49103 52 01
बबहजि Bihar 5357 5357 0 00 5357 5357 0 00
िजमोिि घजटी ननगम DVC 3039 3039 0 00 3039 3039 0 00
झजिखणड Jharkhand 1266 1266 0 00 1266 1266 0 00
ओडडशज Odisha 5389 5389 0 00 5389 5389 0 00
पशशचम बगजल West Bengal 8666 8666 0 00 8666 8666 0 00
मसशककम Sikkim 100 100 0 00 100 100 0 00
अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7
परवी कषतर Eastern Region 23349 23349 0 00 23349 23349 0 00
अरणजचल परिश Arunachal Pradesh 139 136 3 22 139 136 3 22
असम Assam 1712 1667 45 26 1712 1667 45 26
मणणपि Manipur 197 188 9 46 197 188 9 46
मघजलय Meghalaya 336 336 0 00 336 336 0 00
ममज़ोिम Mizoram 116 113 3 26 116 113 3 26
नजगजलड Nagaland 157 131 26 166 157 131 26 166
बिपिज Tripura 292 291 1 03 292 291 1 03
उततर-परवी कषतर North-Eastern Region 2848 2780 68 24 2848 2780 68 24
समपणण भारत All India 177411 176810 601 03 177411 176810 601 03
24
मजग की पनत ा म कमी Demand not Met
Excludes the supply to Bangladesh
राजयStateअपरल 2019 April2019
मजग की पनत ा म कमी Demand not Met
अधिकतम वरवदयत आपरत ण शथिरत ररपोरण (परवाणरवलोकन) Peak Power Supply Position Report (Provisional)
आकड़ मगज वजट नट Figures in MW netअपरल2019 -अपरल2019 April2019 to April2019
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
आकड़ मममलयन यननट नट Figures in MU net
ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied
कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )
चडीगढ़ Chandigarh 96 96 0 00 1561 1561 0 00
दिलली Delhi 1931 1930 1 00 32299 32282 17 01
हरियजणज Haryana 3658 3658 0 00 53665 53665 0 00
दहमजचल परिश Himachal Pradesh 832 830 2 02 9850 9618 232 24
रमम कशमीि Jammu amp Kashmir 1767 1414 353 200 19593 15868 3725 190
परजब Punjab 3585 3585 0 00 55288 55275 13 00
िजरसथजन Rajasthan 6774 6770 4 01 79826 79637 189 02
उतति परिश Uttar Pradesh 8754 8691 63 07 117101 116118 984 08
उततिजखड Uttarakhand 1067 1067 0 00 13845 13753 92 07
उततरी कषतर Northern Region 28464 28041 423 15 383028 377776 5251 14
छततीसगढ़ Chhattisgarh 2464 2457 8 03 26130 26076 54 02
गरिजत Gujarat 9890 9890 0 00 116588 116572 15 00
मधय परिश Madhya Pradesh 6236 6236 0 00 75667 75665 2 00
महजिजषटर Maharashtra 13631 13631 0 00 158285 158148 137 01
िमन औि दिउ Daman amp Diu 221 221 0 00 2557 2557 0 00
िजिि व नगि हवली Dadra amp Nagar Haveli 553 553 0 00 6317 6317 0 00
गोवज Goa 362 362 0 00 4283 4280 3 01
पशचिमी कषतर Western Region 33357 33349 8 00 389827 389615 212 01
आनधर परिश Andhra Pradesh 6072 6071 1 00 63735 63677 58 01
तलगजनज Telangana 6930 6929 1 00 66697 66635 62 01
कनजाटक Karnataka 7614 7612 1 00 71759 71690 69 01
किल Kerala 2489 2488 1 00 25029 24911 118 05
तममल नजड Tamil Nadu 10247 10245 2 00 109375 109273 102 01
पडचिी Puducherry 252 251 1 04 2761 2751 10 03
लकष-दवीप Lakshadweep 4 4 0 0 46 46 0 0
दकषकषणी कषतर Southern Region 33605 33597 8 00 339355 338938 417 01
बबहजि Bihar 2319 2318 1 00 30052 29827 225 07
िजमोिि घजटी ननगम DVC 1773 1772 1 00 22365 21995 369 17
झजिखणड Jharkhand 698 697 1 01 8682 8461 221 25
ओडडशज Odisha 2583 2582 1 00 31810 31781 30 01
पशशचम बगजल West Bengal 4585 4584 2 00 52237 52078 159 03
मसशककम Sikkim 41 41 0 00 513 512 0 01
अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 67 346 323 23 67
परवी कषतर Eastern Region 11999 11995 5 00 145658 144654 1004 07
अरणजचल परिश Arunachal Pradesh 61 60 0 06 864 855 9 10
असम Assam 680 656 23 34 9532 9204 328 34
मणणपि Manipur 68 68 1 09 916 906 10 11
मघजलय Meghalaya 173 173 0 03 1955 1953 1 01
ममज़ोिम Mizoram 50 49 0 09 668 661 8 12
नजगजलड Nagaland 58 57 1 20 902 809 93 103
बिपिज Tripura 150 150 0 00 1859 1837 21 11
उततर-परवी कषतर North-Eastern Region 1240 1214 26 21 16696 16225 471 28
समपणण भारत All India 108665 108196 469 04 1274564 1267209 7355 06
Note The revised data for March 2019 is not avaliable
Excludes energy exported to Bangladesh
राजयState
ऊराण वरवदयत आपरत ण शथिरत ररपोरण (परवाणरवलोकन) Energy Power Supply Position Report (Provisional)
25
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
Energy not Supplied Energy not Supplied
मािण2019 March2019 अपरल2018 -मािण2019 April2018 to March2019
ऊरजा पनत ा म कमी ऊरजा पनत ा म कमी
अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met
कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )
चडीगढ़ Chandigarh 223 223 0 00 369 369 0 00
दिलली Delhi 4016 4016 0 00 7016 7016 0 00
हरियजणज Haryana 6544 6544 0 00 10270 10270 0 00
दहमजचल परिश Himachal Pradesh 1683 1683 0 00 1700 1700 0 00
रमम कशमीि Jammu amp Kashmir 3277 2622 655 200 3277 2622 655 200
परजब Punjab 6564 6564 0 00 12638 12638 0 00
िजरसथजन Rajasthan 11885 11885 0 00 13276 13276 0 00
उतति परिश Uttar Pradesh 16220 16220 0 00 20498 20062 436 21
उततिजखड Uttarakhand 2002 2002 0 00 2216 2216 0 00
उततरी कषतर Northern Region 47925 47356 569 12 63166 61726 1440 23
छततीसगढ़ Chhattisgarh 4444 4128 316 71 4444 4270 174 39
गरिजत Gujarat 16263 16263 0 00 17053 16963 90 05
मधय परिश Madhya Pradesh 12328 12323 5 00 13815 13815 0 00
महजिजषटर Maharashtra 22361 22291 70 03 23864 23254 610 26
िमन औि दिउ Daman amp Diu 336 336 0 01 357 356 1 02
िजिि व नगि हवली Dadra amp Nagar Haveli 800 799 1 01 816 815 1 01
गोवज Goa 538 538 0 00 596 596 0 00
पशचिमी कषतर Western Region 53132 52965 167 03 56675 55821 853 15
आनधर परिश Andhra Pradesh 8977 8977 0 00 9459 9453 6 01
तलगजनज Telangana 10471 10471 0 00 10815 10815 0 00
कनजाटक Karnataka 12841 12841 0 00 12841 12841 0 00
किल Kerala 4264 4228 36 09 4264 4228 36 09
तममल नजड Tamil Nadu 15712 15712 0 00 15712 15712 0 00
पडचिी Puducherry 427 412 15 34 427 412 15 34
लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0
दकषकषणी कषतर Southern Region 49464 49464 0 00 49464 49464 0 00
बबहजि Bihar 4633 4633 0 00 5115 5084 31 06
िजमोिि घजटी ननगम DVC 3035 3035 0 00 3035 3035 0 00
झजिखणड Jharkhand 1210 1210 0 00 1339 1291 48 36
ओडडशज Odisha 4827 4827 0 00 5357 5357 0 00
पशशचम बगजल West Bengal 8287 8287 0 00 9130 9123 7 01
मसशककम Sikkim 100 100 0 00 106 106 0 00
अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7
परवी कषतर Eastern Region 21658 21658 0 00 23141 22733 408 18
अरणजचल परिश Arunachal Pradesh 133 131 2 15 138 138 0 01
असम Assam 1539 1508 31 20 1865 1809 56 30
मणणपि Manipur 204 199 5 25 219 216 3 12
मघजलय Meghalaya 357 357 0 00 374 372 1 04
ममज़ोिम Mizoram 108 105 3 28 121 119 2 17
नजगजलड Nagaland 127 125 2 16 156 138 18 116
बिपिज Tripura 249 249 0 00 298 293 5 17
उततर-परवी कषतर North-Eastern Region 2540 2535 5 02 2967 2850 117 39
समपणण भारत All India 169464 168745 719 04 177022 175528 1494 08
Note The revised data for March 2019 is not avaliable 26
अधिकतम वरवदयत आपरत ण शथिरत ररपोरण (परवाणरवलोकन) Peak Power Supply Position Report (Provisional)
आकड़ मगज वजट नट Figures in MW net
राजयStateमािण2019 March2019 अपरल2018 -मािण2019 April2018 to March2019
मजग की पनत ा म कमी मजग की पनत ा म कमी Demand not MetDemand not Met
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
Excludes the supply to Bangladesh
अपरल 2019 April2019 अपरल2018 -मािण2019 April2019 to April2019
उततरी कषतर Northern Region
चडीगढ़ Chandigarh(Data Not Received)दिलली Delhi
हरियजणज Haryana
दहमजचल परिश Himachal Pradeshरमम कशमीि Jammu amp Kashmir(Data
Not Received)परजब Punjab
िजरसथजन Rajasthanउतति परिश Uttar Pradesh
उततिजखड Uttarakhand
पशचिमी कषतर Western Region
छततीसगढ़ Chhattisgarh
Apr-Nov 2018- No cuts
Maximum Demand cut-58MW
Energy cut- 00020-00032 MUsday
गरिजत Gujarat
मधय परिश Madhya Pradesh
महजिजषटर Maharashtra
गोवज Goa
दकषकषणी कषतर Southern Region
आनधर परिश Andhra Pradesh
तलगजनज Telangana
कनजाटक Karnataka
किल Kerala
तममल नजड Tamil Nadu
पडचिी Puducherryपरवी कषतर Eastern Region
बबहजि Bihar
झजिखणड Jharkhand
ओडडशज Odisha
पशशचम बगजल West Bengal
No N
otifie
d Cu
ts
27
मािण 2019 म इडथरीर पर वरवदयत करौती का वरवरवरण Notified Power CutsRestrictions on Industries during April2019
राजय कषतर State Regionऊराणमाग करौती EnergyDemand Cut
No N
otifie
d Cu
tsNo
Notifie
d Cu
ts
अपरल2019 April 2019 अपरल2019 -अपरल2019 April2019 to April2019
उततरी कषतर Northern Region
चडीगढ़ Chandigarh Data not received Data not received
दिलली Delhi Data not received Data not received
हरियजणज Haryana 0811 hrsday 0811 hrsday
दहमजचल परिश Himachal Pradesh HPSEBL has only 2 agriculture consumers and uninterrupted
power is being supplied to agriculture sector
HPSEBL has only 2 agriculture consumers and uninterrupted
power is being supplied to agriculture sector
रमम कशमीि Jammu amp Kashmir Data not received Data not received
परजब Punjab 379 hrsday 379 hrsday
िजरसथजन Rajasthan 0630 hrsday 0630 hrsday
उतति परिश Uttar Pradesh 2157 hrsday 2157 hrsday
उततिजखड Uttarakhand 2359 hrsday 2359 hrsday
पशचिमी कषतर Western Region
छततीसगढ़ Chhattisgarh 18 hrsday 18 hrsday
गरिजत Gujarat 8 hrsday 8 hrsday
मधय परिश Madhya Pradesh Three-Phase Supply(Irrigation)- 0953 hrs day Three-Phase
(Mixed) Supply - 2334 hrs day
Three-Phase Supply(Irrigation)- 0953 hrs day Three-Phase
(Mixed) Supply - 2334 hrs day
महजिजषटर Maharashtra Three-Phase Supply(Irrigation)- 9 hrs day Three-Phase Supply(Irrigation)- 9 hrs day
गोवज Goa No restriction No restriction
दकषकषणी कषतर Southern Region
आनधर परिश Andhra Pradesh 07 hrsday 07 hrsday
तलगजनज Telangana 24 hrsday 24 hrsday
कनजाटक Karnataka 6 hrsday 6 hrsday
किल Kerala No Restrictions No Restrictions
तममल नजड Tamil Nadu 9 hrsday (6 hrs during day time and 3 hrs during night time) 9 hrsday (6 hrs during day time and 3 hrs during night time)
पडचिी Puducherry No Restrictions No Restrictions
परवी कषतर Eastern Region
बबहजि Bihar 18 hrsday 18 hrsday
झजिखणड Jharkhand 20 hrsday 20 hrsday
ओडडशज Odisha 24 hrsday 24 hrsday
पशशचम बगजल West Bengal 23 hrsday 23 hrsday
28
मारच 2019 कषि कषतर को षिदयत आपरतच का षििरण Power Supply to Agricultural Sector during March2019
राजय कषतर State Regionऔसत वरवदयत आपरत ण घनरो म Average Hours of Supply
On segregated feeders
SNo Contents Page
1 Growth of Installed Capacity since 6th Plan 29
2 Progress of Transmission Sector since 6th Plan 30
3 All India Yearly Coal consumption for Power Generation (Utilities)
4 All India Annual Per Capita Consumption of Electricity since -2006
5 Average cost of power supply amp Average realisation (Paisakwh)
6 Growth of Rural Electrification amp Pump Sets Energisation
7 Status of Hydro Schemes Cleared by the CEA in Apr-2019
Section G - Growth of Power Sector
31
32
(In MW)
Coal Gas Diesel Total
End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472
End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634
End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537
End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596
End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921
End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703
End of 12th Plan 19216288 2532938 83763 21832988 6780 4447842 50018 31960630
Up to Apr-2019 20070450 2493722 63763 22627934 678000 4539922 7764163 35610019
Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-17) = 51529 MW
Electricity Generation (MU) Targets and Achievements for 2016-17
Coal Gas Diesel Nuclear Hydro Res Total
2007045 2493722 637629 678000 453992 77641625 22925174
29
1 Growth of Installed Capacity Since 6th Plan
Plan YearThermal
Nuclear Hydro RES (MNRE) Total
2007045
2493722637629
678000
4539922
77641625
Total Installed Capacity 35610019 MW
Coal Gas Diesel Nuclear Hydro Res
Progress of Transmission Sector in the Country up to April 2019
1 TRANSMISSION LINES (All fig in CKM)
At the end of
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
6th plan 0 0 0 0 0 0 0 0 0 0 0 0 1831 4198 0 6029 1641 44364 0 46005 3472 48562 0 52034
7th plan 0 0 0 0 0 0 0 0 0 0 0 0 13068 6756 0 19824 4560 55071 0 59631 17628 61827 0 79455
8th plan 0 0 0 0 1634 0 0 1634 0 0 0 0 23001 13141 0 36142 6564 73036 0 79600 31199 86177 0 117376
9th plan 0 0 0 0 3234 1504 0 4738 751 409 0 1160 29345 20033 0 49378 8687 88306 0 96993 42017 110252 0 152269
10th plan 0 0 0 0 4368 1504 0 5872 1775 409 0 2184 48708 24730 0 73438 9444 105185 0 114629 64295 131828 0 196123
11th Plan 0 0 0 0 5948 1504 1980 9432 4839 411 0 5250 71023 30191 5605 106819 10140 125010 830 135980 91950 157116 8415 257481
12th Plan 6124 0 0 6124 5948 1504 1980 9432 25465 1177 4598 31240 92482 48240 17065 157787 11014 151276 978 163268 141033 202197 24621 367851
13th Plan (Up
to Mar2019)6124 0 0 6124 5948 1504 1980 9432 33692 1512 6605 41809 101335 58238 21173 180746 11734 162552 1010 175296 158833 223806 30768 413407
13th Plan (Up
to Apr-19)6124 0 0 6124 5948 1504 1980 9432 33745 1512 6605 41862 101335 58258 21173 180766 11734 162953 1010 175697 158886 224227 30768 413881
27150 600 MW of 132 kV Inter-Regional power transmission capacity links which are operated radially from time to time is not added in the total
75050
47900
24000
99050
30
Grand Total
Note - The figure upto the end of 10th plan in for stringing progress including the lines not commissioned Now only commissioned lines are reckoned Accordingly the figure for 10th plan (end) may read
as 187555 after adjusting with (-) 10852 Ckm
Inter-regional Power Transfer Capacity (MW)
plusmn 800 kV HVDC plusmn 500 kV HVDC 765 kV 400 kV 220 kV
IR addition in 12th
Plan (up to March
2017)
Inter-regional
Transmission
Capacity at the end
of Plan Period 2017-
22 (as on April19)
IR at the end of 11th
PlanIR at the end of 12th
Plan
IR Capacity Addition
at the end of Plan
Period 2017-22 (Till
April 19)
2004-05 27800
2005-06 28100
2006-07 30200
2007-08 33000
2008-09 35500
2009-10 36700
2010-11 38700
2011-12 41756
2012-13 45460
2013-14 48940
2014-15 53040
2015-16 54590
2016-17 57430
2017-18 60800
2018-19 62890
Year
2005-06
2006-07
2007-08
2008-09
2009-10
2010-11
2011-12
2012-13
2013-14
2014-15
2015-16
2016-17
2017-18
2018-19
2004-05 254 209 7568
2005-06 260 221 7636
2006-07 276 227 7423
2007-08 293 239 7727
2008-09 340 263 8713
2009-10 355 268 8870
2010-11 398 303 11975
2011-12 455 330 13514
2012-13 501 376 14867
2013-14 518 175
2014-15 520
Source- PFC Reports on the performance of State Power Utilities 31
1181
7335
7786
91441
8188
88363
957
1010
1075
1122
1149
(GrossGen+ Net Import) Mid-year population Provisional
5 Average cost of power supply amp average realization ( paiseKWH )
Yearcost of supply
(paiseunit)
Realization(paiseunit)
Including AgricultureOnly
Agriculture
6719
7171
3 All India yearly Coal Consumption for Power Generation (Utilities)
YEARCoal Consumption
Million Tonnes
4 All India Annual per Capita consumption of Electricity Since 2006
Per Capita Consumption ( kWh)
6314
Sl
NoExecuting Agency
Installed
Capacity (MW)Cost (Rs crore)
Date of
Clearance
32
Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as
Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received
from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made
available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified
villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is
independent of the earlier published reports
No Hydro Electric Project has been issued concurrenceAppraisal letter by CEA during April 2019
7 Status of Hydro Schemes Cleared by the CEA in Apr-2019
Name of Scheme
1999-002000-01
297594
010408 to 310309010409 to 310310
10th Plan
2005-062006-07
322968331020
6 Growth Of Rural Electrification amp Pumpsets Energisation
Plan Year
9th Plan2002-03
134092626
4111
Pump Sets Energised Villages Electricfied (Nos)
2001-02
284064367244
1218
27801997-981998-99
3207
482864
12632
1576036
4451722594
15455554
2314176
397343611750
2093311060316074
65109527813884
46708
18423975
499150
2003-042004-05
5743
9769
Cumu upto End of 10th Plan
010407 to 310308
010410 to 310311557976840909
010411 to 310312
412667
86293726
No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification
since 2004-05
65291374575 296361511th Plan
Cumu upto End of 11th Plan
596556 21212860
557439Cummulative up to end of 12th Plan
SN Contents Page
1 Rate of sale of power for the year 2016-17 33-41
RATE OF SALE OF POWER FOR THE YEAR 2016-17
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) NORTHERN REGION
CENTRAL SECTOR
BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 18000 66900 19800
CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 54000 222400 21600
CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 30000 144400 19600
CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 23100 91700 42600
PARBATI - III HPS NHPC LTD HYDRO-HYDRO 52000 68200 54800
DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 28000 95600 30000
CHUTAK NHPC LTD HYDRO-HYDRO 4400 22000 79800
DULHASTI HPS NHPC LTD HYDRO-HYDRO 39000 228000 56400
SALAL HPS NHPC LTD HYDRO-HYDRO 69000 342300 11000
TANAKPUR HPS NHPC LTD HYDRO-HYDRO 9420 43000 29600
URI HPS -I NHPC LTD HYDRO-HYDRO 48000 280300 16000
URI HPS - II NHPC LTD HYDRO-HYDRO 24000 147300 48600
NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 4500 24600 88200
SEWA - II NHPC LTD HYDRO-HYDRO 12000 47100 43400
ANTA CCPP NTPC LTD THERMAL-GASN 41930 67539 32400
AURAIYA CCPP NTPC LTD THERMAL-GASN 66336 53501 39100
BADARPUR TPS NTPC LTD THERMAL-COAL 70500 159153 44800
DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 84000 296170 42300
DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 98000 526686 46300
DADRI CCPP NTPC LTD THERMAL-GASHSD 82978 227469 33000
FARIDABAD CCPP NTPC LTD THERMAL-GASN 43159 115577 30800
RIHAND STPS I NTPC LTD THERMAL-COAL 100000 596766 24500
RIHAND STPS II NTPC LTD THERMAL-COAL 100000 737069 24600
RIHAND STPS III NTPC LTD THERMAL-COAL 100000 706546 30600
SINGRAULI STPS NTPC LTD THERMAL-COAL 200000 1394068 20400
TANDA TPS NTPC LTD THERMAL-COAL 44000 295438 40800
UNCHAHAR TPS I NTPC LTD THERMAL-COAL 42000 256454 39800
UNCHAHAR TPS II NTPC LTD THERMAL-COAL 42000 273577 38900
UNCHAHAR TPS III NTPC LTD THERMAL-COAL 21000 142780 43000
KOLDAM NTPC LTD HYDRO-HYDRO 80000 363260 43600
NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 303575 25841
RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 108000 668677 35374
NJHPS SJVNL HYDRO-HYDRO 150000 699496 23820
RAMPUR HPS SJVNL HYDRO-HYDRO 41202 195982 32260
TEHRI HPP THDC HYDRO-HYDRO 100000 272543 51800
KOTESHWAR HEP THDC HYDRO-HYDRO 40000 106244 53400
IGSTPS JHAJJAR ARAVALI P CPL THERMAL-COAL 150000 510429 49490
NEYVELI BARSINGSAR NEYVELI LIG CORP LTD THERMAL-LIG 25000 127520 38040
STATE SECTOR
PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 21000 14222 48200
PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 21000 19205 48400
PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 25000 102257 42600
PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 25000 62107 41800
DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 60000 312213 41000
RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 120000 35767442200
WYC HYDEL STATION HPGCL HYDRO-HYDRO 6240 20365 24900
GIRI POWER HOUSE HPSEB HYDRO-HYDRO 6000 13958 7600
ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 1695 5467 11900
BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 12000 18528 6700
GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 2250 7462 22500
BASSI POWER HOUSE HPSEB HYDRO-HYDRO 6600 29649 7500
BINWA POWER HOUSE HPSEB HYDRO-HYDRO 600 2749 19300
ANNEXURE-I
RATE OF SALE OF POWER FOR THE YEAR 2016-2017
Page 33
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) GAJ POWER HOUSE HPSEB HYDRO-HYDRO 1050 2914 26700
BANER POWER HOUSE HPSEB HYDRO-HYDRO 1200 2864 16200
HOLI POWER HOUSE HPSEB HYDRO-HYDRO 300 616 22500
THIROT POWER HOUSE HPSEB HYDRO-HYDRO 450 1126 22500
KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 1200 3064 22500
LARJI POWER HOUSE HPSEB HYDRO-HYDRO 12600 53677 23700
NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 250 750 31000
CHABA POWER HOUSE HPSEB HYDRO-HYDRO 175 465 23300
RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 150 101 13400
SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 200 000 22500
KILLAR HPSEB HYDRO-HYDRO 030 050 22500
BHABA AUGUMENP H HPSEB HYDRO-HYDRO 450 1276 22500
BS CHAMBA HPSEB HYDRO-HYDRO 045 099 19500
GUMMA HPSEB HYDRO-HYDRO 300 423 22500
GAS TURBINE POWER STATION IPGCL THERMAL-GAS 27000 67233 39300
PPS-I PPCL THERMAL-GAS 33000 175905 38300
PPS-III PPCL THERMAL-GAS 137120 196879 36100
LOWER JHELUM JampKPDD HYDRO-HYDRO 10500 60214 5100
UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 2260 10514 6300
UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 10500 44202 8500
GANDHARBAL JampKPDD HYDRO-HYDRO 1500 8925 4700
KARNAH MPH JampKPDD HYDRO-HYDRO 200 1122 31000
CHENANI I JampKPDD HYDRO-HYDRO 2330 10892 6600
CHENANI II JampKPDD HYDRO-HYDRO 200 1188 9300
CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 750 3634 14200
IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 375 2108 18500
IGO MERCHELLONG JampKPDD HYDRO-HYDRO 300 1572 29700
PAHALGAM MHP JampKPDD HYDRO-HYDRO 450 1713 32900
MARPACHOO JampKPDD HYDRO-HYDRO 075 375 29800
HAFTAL JampKPDD HYDRO-HYDRO 100 483 28700
SANJAK JampKPDD HYDRO-HYDRO 126 441 36000
SEWA-III JampKPDD HYDRO-HYDRO 900 3273 20200
BHADERWAH JampKPDD HYDRO-HYDRO 150 935 8900
BAZGO JampKPDD HYDRO-HYDRO 030 108 33300
SUMOOR JampKPDD HYDRO-HYDRO 010 045 35400
HUNDER JampKPDD HYDRO-HYDRO 040 176 26200
STAKNA JampKPDD HYDRO-HYDRO 400 1933 4100
KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 124000 662879 31360
SURATGARH TPS RRVUNL THERMAL-COAL 150000 402328 41730
CHHABRA TPS 1amp 2 RRVUNL THERMAL-COAL 50000 305946 36700
CHHABRA TPS 3 RRVUNL THERMAL-COAL 25000 151536 36700
CHHABRA TPS 4 RRVUNL THERMAL-COAL 25000 155896 36700
RAMGARH GT POWER PROJECT RRVUNL THERMAL-COAL 22050 43177 41800
RAMGARH GAS T P PROJECT 3 RRVUNL THERMAL-GAS 5000 93615 41800
DHOLPUR C C POWER PROJECT RRVUNL THERMAL-R-LNG 33000 9486 46110
MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 14000 20855 34192
MINI MICRO HYDEL (MMH) P S RRVUNL HYDRO-HYDRO 2385 851 37800
KALISINDH TPP 1 RRVUNL THERMAL-COAL 60000 341543 45000
KALISINDH TPP 2 RRVUNL THERMAL-COAL 60000 211588 45000
KHARA HEP UPJVNL HYDRO-HYDRO 7200 26654 7200
MATATILLA HEP UPJVNL HYDRO-HYDRO 3060 12219 6500
OBRA HEP UPJVNL HYDRO-HYDRO 9900 21517 6300
RIHAND UPJVNL HYDRO-HYDRO 30000 57369 5500
ANPARA A TPS UPRVUNL THERMAL-COAL 63000 317536 27000
ANPARA B TPS UPRVUNL THERMAL-COAL 100000 705605 22700
ANPARA D UPRVUNL THERMAL-COAL 100000 300158 39800
HARDUAGANJ TPS UPRVUNL THERMAL-COAL 16500 45817 49200
HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 50000 304389 46600
OBRA A TPS UPRVUNL THERMAL-COAL 28800 13158 34000
OBRA B TPS UPRVUNL THERMAL-COAL 100000 328124 21900
Page 34
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) PANKI TPS UPRVUNL THERMAL-COAL 21000 66488 50300
PARICHHA TPS UPRVUNL THERMAL-COAL 22000 38762 49400
PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 42000 231931 45600
PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 50000 276722 50400
CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 24000 70845 8290
CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 14400 75366 8390
DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 3375 9595 12080
DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 5100 18701 10520
KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4140 17359 12330
KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 12000 33001 9420
KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 3000 11953 8320
TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 9000 33983 12460
MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 30400 124510 16110
RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 19800 17897 10550
MPUR UTTARAKHAND JVNL HYDRO-HYDRO 930 5121 19200
PATHRI UTTARAKHAND JVNL HYDRO-HYDRO 2040 11636 14200
GALOGI UTTARAKHAND JVNL HYDRO-HYDRO 300 648 12500
PRIVATE SECTOR
MGTPP CLP INDIA PVT LTD THERMAL-COAL 132000 268902 41940
SHRINAGAR HEP ALAKNANDA HPCL HYDRO-HYDRO 33000 127414 48800
GAMA INFRAPROP CCPP GAMA INFRAPROP PVT THERMAL-GAS 22500 52686 47000
PPGCL (BARA) JP POWER VENTURES LTD THERMAL-COAL 198000 448200 38500
MALANA HEP MALANA PCL HYDRO-HYDRO 8600 26354 29792
MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 10000 30369 32580
ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 19200 56347 36079
KASHANG HEP H P PCL HYDRO-HYDRO 19500 5034 29200
BASPA-II HEP HBPCL HYDRO-HYDRO 30000 132769 13600
KARCHAM WANGTOO HEP HBPCL HYDRO-HYDRO 100000 434386 36600
RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 108000 582600 43700
RITHALA COMBI CY POWER PLANT TATA POWER DDL THERMAL-GAS 9480 000 11900
RAJPURA TPS NABHA POWER LTD THERMAL-GAS 140000 901484 39000
TALWANDI SABO POWER LTD TALWANDI SABO POWER LTD THERMAL-COAL 198000 636040 49548
ROJA THERMAL POWER STATION ROJA POWER SCL THERMAL-COAL 120000 727200 43400
KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 34400 63400
BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 36000 62600
MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 38200 60800
UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 37900 61500
KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 42300 58800
LALITPUR PGCL BAJAJ ENERGY PVT LTD THERMAL-COAL 198000 359400 47300
PRAYAGRAJ PGCL PRAYAGRAJ PGCL THERMAL-COAL 132000 448200 38595
KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 132000 783182 33438
WESTERN REGION
CENTRAL SECTOR
INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 100000 325333 23892
OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 52000 141663 34001
GANDHAR CCPP NTPC LTD THERMAL-GAS 65739 221924 28700
KAWAS CCPP NTPC LTD THERMAL-GASN 65620 167929 27000
KORBA I amp II NTPC LTD THERMAL-COAL 210000 1499171 20500
KORBA III NTPC LTD THERMAL-COAL 50000 358746 26600
SIPAT STPS I NTPC LTD THERMAL-COAL 198000 1479902 26800
SIPAT STPS II NTPC LTD THERMAL-COAL 100000 766549 26500
VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 126000 693142 25800
VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 100000 608781 23800
VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 100000 673475 27600
VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 100000 655924 32900
VINDHYACHAL STPS V NTPC LTD THERMAL-COAL 50000 328265 31700
MOUDA I NTPC LTD THERMAL-COAL 100000 343130 44500
MOUDA Ii NTPC LTD THERMAL-COAL 66000 40637 39900
RATNAGIRI GAS amp POWER PVT LTD RGPPL THERMAL-GAS 196708 442485 47000
KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 000 24729
TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 32000 201227 10740
Page 35
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 365122 19069
TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 787444 29324
STATE SECTOR
GSEG-HAZIRA15610 MW GUJARAT S ENEGEN LTD THERMAL-GAS 15610 1805 28200
GSEG-HAZIRA35143 MW GUJARAT S ENEGEN LTD THERMAL-GAS 35130 22276 51300
GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 21978 51800
AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 13929 26100
KORBA TPS EAST CSPGCL THERMAL-COAL 44000 198673 33880
DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 365808 27570
KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 316500 30420
HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 532878 19410
CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 515 58300
MTTPS CHAMPA U-I CSPGCL THERMAL-COAL 50000 220376 39000
MTTPS CHAMPA U-II CSPGCL THERMAL-COAL 50000 23709 10000
SHP GANGREL CSPGCL HYDRO-HYDRO 1000 2350 36790
BANGO HEP CSPGCL HYDRO-HYDRO 12000 14662 8900
MHP KORBA WEST CSPGCL HYDRO-HYDRO 170 859 38190
SIKASAR HEP CSPGCL HYDRO-HYDRO 700 418 26870
DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8843 74500
DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 19446 51500
GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 66388 71600
GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127488 41300
KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 96072 43900
KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 29841 56400
SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 184966 58800
UKAI 1-5 GSECL THERMAL-COAL 85000 204891 46900
UKAI TPS 6 GSECL THERMAL-COAL 50000 284448 48200
WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 271999 58300
WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 82808 44100
KADANA HPS GSECL HYDRO-HYDRO 24200 34433 16800
UKAI HPS GSECL HYDRO-HYDRO 30500 40585 6100
TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 123000 11500
BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 8900 10900
BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 7200 27500
JHINNA HPS MPPGCL HYDRO-HYDRO 2000 9700 18500
RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 44300 3400
GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 17300 4600
SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 4100 16900
MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 14600 27000
PENCH HPS MPPGCL HYDRO-HYDRO 16000 23700 8100
RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 3000 16900
AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 134400 35100
SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 283800 38700
SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 344600 34300
SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 111600 61600
SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 211800 58000
SSTPS PH-I MPPGCL THERMAL-COAL 120000 233100 84300
BHUSAWAL TPS MSPGCL THERMAL-COAL 142000 566258 51100
CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1365682 33700
KHAPERKHEDA MSPGCL THERMAL-COAL 134000 706207 39100
KORADI TPS MSPGCL THERMAL-COAL 62000 443206 42000
NASIK TPS MSPGCL THERMAL-COAL 63000 297275 47000
PARLI TPS MSPGCL THERMAL-COAL 113000 175934 71600
PARAS MSPGCL THERMAL-COAL 50000 267931 38700
URAN CCPP MSPGCL THERMAL-GAS 67200 320330 30600
KOYANA MSPGCL HYDRO-HYDRO 195600 328155 13100
SMALL HYDRO POWER PLANTS MSPGCL HYDRO-HYDRO 45400 93062 30500
BHIRA MSPGCL HYDRO-HYDRO 8000 10046 8400
TILLARI MSPGCL HYDRO-HYDRO 8900 10584 3100
SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 233298 20500
SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 87633 20500
PRIVATE SECTOR
Page 36
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 81282 46750
JNSTPP(JAYPEE NIGRIE) JP POWER VENTURES LTD THERMAL-COAL 132000 726695 29310
MB POWER MB POWER THERMAL-COAL 120000 345632 38310
ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 754922 28671
ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 780761 23495
ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 198000 1263784 32090
ADANI POWER MAHARA ADANI POWER LTD THERMAL-COAL 330000 1666191 34124
AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 170065 36827
SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 252035 45129
ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 458551 36000
ESSAR POWER MP LTD ESSAR POWER MP LTD THERMAL-COAL 60000 243040 28600
VEDANTA LTD (P P -I) VEDANTA LTD THERMAL-GAS 3000 15044 24000
VEDANTA LTD (P P -II) VEDANTA LTD THERMAL-GAS 3000 21293 24000
PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 8234600 24000
165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 5850 64390
145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 68717 40349
SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 132655 28776
SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 144686 38567
MUNDRA UMPPCOASTAL GUJARAT POWER
LTD THERMAL-IMP COAL 400000 2530300
23900
LANCO AMARKANTAK TPP PATHADIH
U-ILANCO AMARKAN POWER LTD THERMAL-COAL 30000 195500
29200
LANCO AMARKANTAK TPP PATHADIH
U-IILANCO AMARKAN POWER LTD THERMAL-COAL 30000 206900
27600
BARADARHA TPS D B POWER LTD THERMAL-COAL 120000 677373 29200
JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 405000 28900
JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 453000 40500
DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 339437 40700
TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 293400 44000
TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 137200 37000
TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 174900 44000
BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 92900 14100
BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23700 34300
KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 27600 48300
CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2530300 23900
BHANDARDRA HEP -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 2475 54900
SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 161400 26500
SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 445000 39000
SOTHERN REGION
CENTRAL SECTOR
NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 325699 54820
NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 305532 39880
NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 998805 38510
NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 113016 54070
NEYVELI TAMILNADU POWER LTD JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 625274 42200
VALLUR TPS NTPC TECL THERMAL-COAL 150000 856438 42350
R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 1493 84300
RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1502919 29400
RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 341291 31800
SIMHADRI I NTPC LTD THERMAL-COAL 100000 688382 36800
SIMHADRI II NTPC LTD THERMAL-COAL 100000 663657 43400
KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 593110 31324
MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 291625 21764
KKNPP-1 amp 2 NPCIL NUCLEAR-NUCLEAR 200000 572609 40948
MINICOY LAKSHADEEP THERMAL-DIESEL 340 770 29600
KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1097 29600
AMINI LAKSHADEEP THERMAL-DIESEL 265 509 29600
ANDROTT LAKSHADEEP THERMAL-DIESEL 219 524 29600
KALPENI LAKSHADEEP THERMAL-DIESEL 175 356 29600
AGATTI LAKSHADEEP THERMAL-DIESEL 195 658 29600
KADMAT LAKSHADEEP THERMAL-DIESEL 190 414 29600
KILTAN LAKSHADEEP THERMAL-DIESEL 150 269 29600
CHETLET LAKSHADEEP THERMAL-DIESEL 100 139 29600
BITRA LAKSHADEEP THERMAL-DIESEL 043 024 29600
BANGARAM LAKSHADEEP THERMAL-DIESEL 018 009 29600
Page 37
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) STATE SECTOR
Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 721811 46500
Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 50000 336142 46500
RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 237358 46500
RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 239926 46500
RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 124500 46500
SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 62109 46500
UPPER SILERU APGENCO HYDRO-HYDRO 24000 33000 46500
LOWER SILERU APGENCO HYDRO-HYDRO 46000 81066 46500
DONKARAI APGENCO HYDRO-HYDRO 2500 6007 46500
PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 1262 46500
CHETTIPETA APGENCO HYDRO-HYDRO 100 214 46500
MUCHKUND APGENCO HYDRO-HYDRO 12000 37571 46500
NAGARJUNASAGAR RCPH APGENCO HYDRO-HYDRO 9000 606 46500
TUNGABHADRA HES amp HAMPI(AP
Share)
APGENCO HYDRO-HYDRO 7200 6100 46500
KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 352232 42600
KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 288131 32500
KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 319272 46500
RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 40073 44300
KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 308317 46000
KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 308963 51300
SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 61004 76600
NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 17960 75300
PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 20873 58300
POCHAMPAD-I TSPGENCO HYDRO-HYDRO 2700 5455 29800
POCHAMPAD-II TSPGENCO HYDRO-HYDRO 900 1932 40700
NIZAMSAGAR TSPGENCO HYDRO-HYDRO 1000 1126 53400
RAICHUR TPS 1 to 7 KPCL THERMAL-COAL 147000 890866 43800
RAICHUR TPS 8 KPCL THERMAL-COAL 25000 159523 48200
BELLARI TPS 1 KPCL THERMAL-COAL 50000 318679 51100
BELLARI TPS 2 KPCL THERMAL-COAL 50000 232347 55600
BELLARI TPS 3 KPCL THERMAL-COAL 70000 47565 34400
BHADRA PH KPCL HYDRO-HYDRO 3920 2369 45900
GERUSUPPA PH KPCL HYDRO-HYDRO 24000 26990 22000
GHAT PRABHA HEP KPCL HYDRO-HYDRO 3200 4777 25300
KADRA HPS KPCL HYDRO-HYDRO 15000 16889 26800
NAGJHARI KPCL HYDRO-HYDRO 90000 155159 9800
KODASALLI DPH KPCL HYDRO-HYDRO 12000 14854 19200
MUNIRA+MGH+SPH+SPH KPCL HYDRO-HYDRO 22640 48211 7900
SHARAVATHY HPS KPCL HYDRO-HYDRO 108550 276215 5400
ALMATTI DPH KPCL HYDRO-HYDRO 29000 39611 24600
VARAHI UGPH KPCL HYDRO-HYDRO 46000 71368 15600
IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 17196 15300
IDUKKI HPS KSEB HYDRO-HYDRO 78000 137905 15300
KAKKAD HPS KSEB HYDRO-HYDRO 5000 13063 15300
KALLADA HPS KSEB HYDRO-HYDRO 1500 4436 15300
KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 46544 15300
KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 635 15300
LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 30822 15300
MALANKARA HPS KSEB HYDRO-HYDRO 1050 2474 15300
MATTUPETTY KSEB HYDRO-HYDRO 200 230 15300
MALAMPUZHA KSEB HYDRO-HYDRO 250 063 15300
CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 864 15300
URUMI ST I amp II KSEB HYDRO-HYDRO 615 903 15300
LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 248 15300
NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7765 19625 15300
PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 16601 15300
PANNIAR HPS KSEB HYDRO-HYDRO 3240 6217 15300
PORINGALKUTHU KSEB HYDRO-HYDRO 3600 10052 15300
PORINGALKUTHU LBE KSEB HYDRO-HYDRO 1600 9438 15300
PEPPARA KSEB HYDRO-HYDRO 300 395 15300
POOZHITHODE KSEB HYDRO-HYDRO 480 1045 15300
Page 38
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) PEECHI KSEB HYDRO-HYDRO 125 040 15300
RANI-PERUNADU KSEB HYDRO-HYDRO 400 585 15300
SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 79783 15300
SENGULAM HPS KSEB HYDRO-HYDRO 5120 11558 15300
SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 16711 15300
VILANGAD KSEB HYDRO-HYDRO 750 1578 15300
BARAPOLE KSEB HYDRO-HYDRO 1500 1932 15300
VELLATHOOVAL KSEB HYDRO-HYDRO 360 305 15300
CHIM0NY KSEB HYDRO-HYDRO 250 156 15300
ADYANPARA KSEB HYDRO-HYDRO 350 501 15300
BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 554 15300
KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 3801 15300
KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 23132 32800
ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 14416 62280
METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 523970 62280
METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 321270 62280
NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 336575 62280
NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 591240 62280
TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 508966 62280
KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 30897 62280
VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 18720 90699 62280
KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 33593 62280
BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 1047 62280
PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 1250 62280
PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 330 62280
MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 4897 62280
MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 032 62280
KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15681 62280
KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 40608 62280
KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 21342 62280
KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 4717 62280
KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4322 62280
KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2399 62280
METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 4416 62280
METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 8035 62280
BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2187 62280
BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2359 62280
BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2511 62280
BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 1949 62280
BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 1819 62280
POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 172 62280
SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 241 62280
MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 026 62280
THIRUMOORTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 136 62280
PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 9309 62280
VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 353 62280
SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 4192 62280
PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 6571 62280
SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 1186 62280
SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6319 62280
ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 6122 62280
KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 28674 62280
SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 18381 62280
SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 4258 62280
KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 12680 62280
KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4201 62280
ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 000 62280
PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 19175 62280
AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 078 62280
BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 504 62280
BHAVANI KATTALAI (BKB)(IIIampIII BB I amp II)TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 5847 62280
PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 000 62280
Page 39
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) SRI DAMODARAM STPS APPDCL THERMAL-COAL 160000 808108 36300
PRIVATE SECTOR
KARUPPUR TANJORE LANCO TANJORE PCL THERMAL-GAS 12000 48096 28770
SIMHAPURI ENERGY LTD SIMHAPURI ENERGY LTD THERMAL-COAL 60000 143900 39100
JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 7111 45500
SBU 1 JSW ENERGY LTD
VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 26000 159100
43300
SBU 2 JSW ENERGY LTD
VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 60000 247900
42800
LANCO KPLLANCO KONDAPALLI POWER
LTDTHERMAL-GAS 36814 85060
25776
LANCO KPL STG -IILANCO KONDAPALLI POWER
LTDTHERMAL-GAS 36600 12979
46330
LANCO KPL STG -IIIALANCO KONDAPALLI POWER
LTDTHERMAL-GAS 37100 85710
46330
LANCO KPL STG -III BLANCO KONDAPALLI POWER
LTDTHERMAL-GAS 37100 43639
46330
HINDUJA NATIONAL PCL HINDUJA NATIONAL PCL THERMAL-COAL 104000 303000 38200
MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 121164 49940
UDUPI POWER COR LTD ADANI POWER LTD THERMAL-COAL 120000 754613 42500
SPECTRUM POWER GENERATION
LTD SPECTRUM PG LTD THERMAL-GASN 20525 9256812
34952
TAQA NEYVELI POWER COM PVT
LTD TAQA NEYVELI THERMAL-LIG 25000 5840
34500
ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 251000 51000
ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 207860 36800
GMR VEMAGIRI POWER GENERATION
LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 30117
46450
EASTERN REGION
CENTRAL SECTOR
MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 64675 53113
MTPS STAGE - II KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 39000 1432 69138
BOKARO `B` TPS DVC THERMAL-COAL 63000 145670 31539
MEJIA TPS U 1-3 DVC THERMAL-COAL 63000 348298 31552
MEJIA TPS U 4 DVC THERMAL-COAL 21000 116099 34997
MEJIA TPS U 5-6 DVC THERMAL-COAL 50000 276427 35976
MEJIA TPS U 7-8 DVC THERMAL-COAL 100000 552854 36991
DURGAPUR STEEL TPS DVC THERMAL-COAL 100000 665550 39323
DURGAPUR TPS DVC THERMAL-COAL 21000 59270 35416
RAGHUNATHPUR TPS DVC THERMAL-COAL 120000 201650 35326
MAITHON HYDEL STA DVC HYDRO-HYDRO 6320 12200 17984
CHANDRAPURA TPSU1-3 DVC THERMAL-COAL 42000 257610 35095
CHANDRAPURA TPSU7-8 DVC THERMAL-COAL 50000 306673 34987
KODERMA TPS DVC THERMAL-COAL 100000 380180 38131
PANCHET HPS DVC HYDRO-HYDRO 8000 13360 17984
TILLAYA HPS DVC HYDRO-HYDRO 400 1410 17984
RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34700 35400
TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 277300 23200
TLDP -III NHPC LTD HYDRO-HYDRO 13200 55400 62000
TLDP -IV NHPC LTD HYDRO-HYDRO 16000 60300 25600
FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 957219 33700
FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 308943 41000
BONGAINGAON TPS NTPC LTD THERMAL-COAL 25000 153663 58600
KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 542277 34200
KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 942591 34200
BARH-II NTPC LTD THERMAL-COAL 132000 728021 44500
TALCHER TPS NTPC LTD THERMAL-COAL 46000 335521 30100
TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 702319 25600
TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1436521 24700
STATE SECTOR
BTPS(RampM) BIHAR STATE PGCL THERMAL-COAL 22000 12142 39700
BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 98331 10602
HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 50593 9482
CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 19689 2605
RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 53192 6033
UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 147208 14637
Page 40
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 60353 4519
IB TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 288567 25000
J P H GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 210 038 61100
MEYONG CHU GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 400 1086 61100
TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 122667 38200
DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 214339 43321
KOLAGHAT THERMAL POWER
STATION
WEST BENGAL PDCL THERMAL-COAL 126000 538269 31603
BAKRESHWAR THERMAL POWER
PLANT
WEST BENGAL PDCL THERMAL-COAL 105000 634876 32154
BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 45000 166855 33299
SANTHALDIH THERMAL POWER
STATION
WEST BENGAL PDCL THERMAL-COAL 50000 336442 34932
SAGARDIGHI THERMAL POWER
PROJECT
WEST BENGAL PDCL THERMAL-COAL 160000 423121 34705
JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 20344 68900
RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 24559 68900
TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 4623 68900
PURULIA PUMPED STORAGE
PROJECT
WEST BENGAL SEDCL HYDRO-HYDRO 90000 108816 68900
MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2768 68900
PRIVATE SECTOR
CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 49474 20230
CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 555500 70200
HALDIA ENERGY HALDIA ENERGY LTD THERMAL-COAL 60000 371000 50400
DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3688 63400
KAMALANGA TPS GMR KAMALANGA ENERGY LTD THERMAL-COAL 105000547670
33300
ADHUNIK POWER U-1 ADHUNIK POWER THERMAL-COAL 27000 158 44060
ADHUNIK POWER U-2 ADHUNIK POWER THERMAL-COAL 27000 168 44250
VL-JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 332800 23622
JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 43000 45250
JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 71700 37030
JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 70700 35920
JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 71100 38870
JOJOBERA UNIT 5 TATA POWER COM LTD THERMAL-COAL 12000 79300 44560
JOJOBERA UNIT 6 TATA POWER COM LTD THERMAL-WHR 12000 83700 12840
IEL KALINGANAGAR U-I TATA POWER COM LTD THERMAL-WG 6750 33400 22500
IEL KALINGANAGAR U-II TATA POWER COM LTD THERMAL-WG 6750 34800 22500
MAITHON UNIT 1 amp 2 TATA POWER COM LTD THERMAL-COAL 105000 678000 36100
HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 27500 24340
HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 28400 24340
HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 15800 24310
NORTH EASTERN REGION
CENTRAL SECTOR
LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 74100 36600
AGARTALA GT NEEPCO THERMAL-GAS 13500 88611 27210
ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 153111 32310
DOYANG HEP NEEPCO HYDRO-HYDRO 7500 25598 49801
KOPILI HEP NEEPCO HYDRO-HYDRO 20000 98186 11491
KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 19582 20237
KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 10310 17968
RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 124093 22945
TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 10100 17344 39000
STATE SECTOR
HYDRO POWER (122 Stns) ITANAGAR GOVT OF ARUNACHAL
PRADESHHYDRO-HYDRO 6971 6217270
24600
KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39514 17337
LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 82327 36810
NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 33318 48290
MYNTRIANG SHEP ST II ASSAM POWER GENCO HYDRO-HYDRO 300 567 35776
LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 9130 49200
LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 012 49200
DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 022 49200
TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 000 49200
UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 4990 16000
UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 6476 37000
UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 16494 14600
UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 3600 9556 15000
SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 758 8000
MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44070 44800
KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 154 41400
TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 091 41400
MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 411 41400
MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 394 41400
KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 760 41400
SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 3264 41400
LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 044 41400
BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 18953 28000
ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 43585 28200
GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 4080 11100
Note
LIG Lignite N Naptha WHR Waste Heat Recovery
Page 41
Sector Apr-2018 Apr-2019
Central 7634 7459
State 6438 6142
Private Sector IPP 5525 6005
Private Sector UTL 6815 6440
ALL INDIA 6454 6471
Month PLF 2018 PLF 2019
Jan 6215 6054
Feb 6230 6051
March 6452 6340
April 6454 6471
For Coal and Lignite based Power Plants and Provisional based on Actual-Cum-Assesment
10
PLF of Thermal Power Plants
(excluding gas based power plants)
All India PLF of Thermal Plants (Excluding Gas Based Plants) Month-wise
10 All India Thermal PLF Sector-wise (Excluding Gas Based Power Plants) for Apr-2019
5800
6000
6200
6400
6600
Jan Feb March April
Months
All India PLF Month-wise
PLF 2018 PLF 2019
7634
64385525
6815 6454
7459
6142 60056440 6471
000
2000
4000
6000
8000
10000
Central State Private Sector IPP Private Sector UTL ALL INDIA
All India Thermal PLF
Apr-2018 Apr-2019
2012-13 2013-14 2014-15 2015-16 2016-17 2017-18
TampD Losses 2304 2284 2277 2181 2142 2104
ATampC Losses 2548 2262 2572 2398 NA NA
Provisional
Note As per PFC for utilities selling directly to consumers NA- Not Available
Total Number of Villages
597464
Note From the year 2004-05 onwards Definition of Village Electrification-
A village would be declared Electrified if
Without
Subsidy
Gap ACS-
ARR(
Without
Subsidy)
Paiseunit
Gap ACS-
ARR (on
subsidy
booked
basis)
paiseunit
Gap ACS-
ARR (on
subsidyrece
ived basis)
paiseunit
2013-14 400 118 76 77
2014-15 412 108 58 60
Source- PFC Reports on the performance of State Power Utilities
2013-14 4894
2014-15 5304
2015-16 5459
2016-17 5743
2017-18 6080
2018-19 6289
11
11 T amp D and ATampC Losses ()
12 All India Village Electrification
Villiages Electrified (Nos)
10000All villages as per census 2011 has
been electrified on 28042018
Villages electrified
Average cost of supply(ACS)
(paiseunit)
i) Basic Infrastructure such as Distribution Transformer and Distribution lines are provided in the inhabited locality
as well as Dalit Basti hemlet where it exists (For electrification through Non-Conventional Energy Sources a
Distribution Transformer may not be necessary)
14 All India Coal consumption for Power Generation (MT)
520
Average Revenue Realization(paiseunit)
518
Year
ii) Electricity is provided to Public places like Schools Panchayat Office Health Centre Dispensaries Community
Centres etc and
iv) Mandatory Certification from Gram Panchayat regarding the completion of village electrification should be
obtained
13 Average cost of Power amp Average Realisation
iii) The number of households electrified should be at least 10 of the total number of households in the village
SN Contents Page
1 Capacity Addition Targets and Achievements in 12th Plan amp upto March2019 12
2 Capacity Addition Targets amp Achievements during Apr-2019 and Apr-19 to Apr-19 13
3 Installed Capacity in various Regions including their shares 14-19
Section B - Capacity Addition
(i) CAPACITY ADDTION TARGETS AND ACHIEVEMENTS IN THE 12TH PLAN Figures in MW
TARGET ACH TARGET ACH TARGET ACH TARGET ACH
CENTRAL 14878 15869 6004 2584 5300 2000 26182 20453
STATE 13922 22201 1608 2276 0 0 15530 24477
PRIVATE 43540 53661 3285 619 0 0 46825 54280
ALL INDIA 72340 91730 10897 5479 5300 2000 88537 99209
(ii) CAPACITY ADDITION TARGET AND ACHIEVEMENT FOR 2017-18 (IN MW)
THERMAL HYDRO NUCLEAR
TARGET ACH TARGET ACH TARGET ACH TARGET ACH
CENTRAL 4880 3170 800 390 500 6180 3560
STATE 3546 1760 300 200 0 3846 1960
PRIVATE 2940 3780 205 205 0 3145 3985
ALL INDIA 11366 8710 1305 795 500 0 13171 9505
(iii) CAPACITY ADDITION ACHIEVEMENT FOR 2018-19 (IN MW)
TARGET ACH TARGET ACH TARGET ACH TARGET ACH
CENTRAL 2760 1960 710 110 0 0 3470 2070
STATE 4506 2850 130 30 0 0 4636 2880
PRIVATE 0 972 0 0 0 0 0 972
ALL INDIA 7266 5782 840 140 0 0 8106 5922
12
SECTOR
SECTOR
TOTAL
TOTALNUCLEARHYDROTHERMAL
1 Capacity Addtion Targets and Achievements in the 12th Plan amp upto March2019
SECTORTHERMAL HYDRO NUCLEAR TOTAL
(MW)
Cummulative
Deviation
Target Achievement Target Achievement (+) (-)
Central 6040 500 0 500 0 -500
State 425615 660 0 660 0 -660
Private 0 0 0 0 0 0
Total 1029615 1160 0 1160 0 -1160
Central 600 0 0 0 0 0
State 21099 0 0 0 0 0
Private 379 0 0 0 0 0
Total 118999 0 0 0 0 0
Nuclear Central 700 0 0 0 0 0
Central 7340 500 0 500 0 -500
State 446714 660 0 660 0 -660
Private 379 0 0 0 0 0
Total 1218614 1160 0 1160 0 -1160
Electricity Generation (MU) Targets and Achievements for 2016-17
13
Hydro
All India
Capacity Addition TargetsAchievements during the Month of Apr-2019
Thermal
2 Capacity Addition Targets Achievements During Apr-2019
Schemes Sector
Target 2019-20
Apr-19 to Apr-19Apr-19
11
60
0 0
11
60
0 0 0 0
0
200
400
600
800
1000
1200
1400
Thermal Hydro Nuclear Total
MW
Targets and Achievement during 2019-20Target Achievement
0
200
400
600
800
1000
1200
Thermal Hydro Nuclear Total
1160
0 0
1160
0 0 00
MW
Target Achievement
Coal Lignite Gas Diesel Total
State 1634400 25000 287920 000 1947320 000 869755 69956 2887031
Private 2168083 108000 55800 000 2331883 000 251400 1312046 3895329
Central 1233537 25000 234406 000 1492943 162000 849622 37900 2542465
Sub Total 5036020 158000 578126 000 5772146 162000 1970777 1419902 9324825
State 2156000 104000 284982 000 2544982 000 544650 54789 3144421
Private 3474567 50000 467600 000 3992167 000 48100 2186476 6226743
Central 1650295 000 328067 000 1978362 184000 162000 66630 2390992
Sub Total 7280862 154000 1080649 000 8515511 184000 754750 2307894 11762155
State 1993250 000 79198 28788 2101236 000 1177483 58688 3337407
Private 1187450 25000 532210 27370 1772030 000 000 3749140 5521170
Central 1123502 289000 35958 000 1448460 332000 000 54190 1834650
Sub Total 4304202 314000 647366 56158 5321726 332000 1177483 3862018 10693227
State 624000 000 10000 000 634000 000 353792 27511 1015303
Private 638700 000 000 000 638700 000 39900 111637 790237
Central 1483664 000 000 000 1483664 000 100520 1000 1585184
Sub Total 2746364 000 10000 000 2756364 000 494212 140148 3390724
State 000 000 49771 3600 53371 000 42200 23325 118895
Private 000 000 2450 000 2450 000 000 6104 8554
Central 77002 000 125360 000 202362 000 100500 3000 305862
Sub Total 77002 000 177581 3600 258183 000 142700 32429 433311
State 000 000 000 4005 4005 000 000 525 4530
Private 000 000 000 000 000 000 000 738 738
Central 000 000 000 000 000 000 000 510 510
Sub Total 000 000 000 4005 4005 000 000 1773 5778
State 6407650 129000 711871 36393 7284913 000 2987880 234793 10507586
Private 7468800 183000 1058060 27370 8737230 000 339400 7366140 16442770
Central 5568000 314000 723791 000 6605791 678000 1212642 163230 8659663
Total 19444450 626000 2493722 63763 22627934 678000 4539922 7764163 35610019
Figures at decimal may not tally due to rounding off
Note -
(As per latest information available with MNRE)
Break up of RES all India as on 31032019 is given below (in MW)
459315 3562597 2818071 7764163
A 0 MW
B Apr 2019 0 MW
C
Apr 2019 0 MW
D Net Capacity Added during Apr 2019 A-B-C 0 MW
Sector wise breakup of RES capacity as shown is provisional
Share of installed capacity of BBMB Stations is included in state sector of partner states
BM PowerCogen Waste to Energy
910350 13830
Capacity Added during Apr 2019
Capacity Retired during
Capacity removed due to change
from Conventional to RES during
Islands
ALL INDIA
Abbreviation- SHP=Small Hydro Project (le 25 MW) BP=Biomass Power UampI=Urban amp Industrial Waste Power RES=Renewable Energy Sources
1 RES include SHP BP UampI Solar and Wind Energy Installed capacity in respect of RES (MNRE) as on 31032019
Small
Hydro PowerWind Power
Bio-PowerSolar Power
Total
Capacity
RES
(MNRE)
Northern Region
Western Region
Southern Region
Eastern Region
North Eastern
Region
ALL INDIA INSTALLED CAPACITY (IN MW) OF POWER STATIONS
(As on 30042019)
(UTILITIES)
Region Ownership Sector
Mode wise breakup
Grand TotalThermalNuclear Hydro
Coal Lignite Gas Diesel Total
State 13500 000 180040 000 193540 000 000 000 193540
Private 86922 000 10800 000 97722 000 000 17889 115611
Central 311272 000 20701 000 331973 10283 72309 000 414565
Sub-Total 411694 000 211541 000 623235 10283 72309 17889 723716
State 272000 000 15000 000 287000 000 110282 6930 404212
Private 408078 000 000 000 408078 000 20000 34512 462590
Central 129472 000 53561 000 183034 10094 66370181 500 259998
Sub-Total 809550 000 68561 000 878112 10094 196652 41942 1126799
State 000 000 000 000 000 000 69460 25661 95121
Private 000 000 000 000 000 000 99200 62668 161868
Central 18340 000 6201 000 24541 2895 122388 000 149824
Sub-Total 18340 000 6201 000 24541 2895 291048 88329 406813
State 000 000 17500 000 17500 000 123000 12903 153403
Private 000 000 000 000 000 000 000 6483 6483
Central 50639 000 12907 000 63547 6798 109188 000 179533
Sub-Total 50639 000 30407 000 81047 6798 232188 19386 339419
State 176000 000 15000 000 191000 000 259770 12780 463550
Private 511550 000 000 000 511550 000 28800 115462 655812
Central 85458 000 26401 000 111859 19681 92342 000 223882
Sub-Total 773008 000 41401 000 814409 19681 380912 128242 1343244
State 626000 25000 60380 000 711380 000 109618 2385 823383
Private 280200 108000 000 000 388200 000 10400 730181 1128781
Central 95625 25000 22110 000 142735 55674 73901 34400 306710
Sub-Total 1001825 158000 82490 000 1242315 55674 193919 766966 2258874
State 546900 000 000 000 546900 000 72410 2510 621820
Private 871433 000 000 000 871433 000 84200 288760 1244393
Central 379639 000 54949 000 434588 28948 180253 3000 646789
Sub-Total 1797972 000 54949 000 1852921 28948 336863 294270 2513002
State 000 000 000 000 000 000 125215 6787 132002
Private 9900 000 45000 000 54900 000 8800 52620 116320
Central 34324 000 6966 000 41290 3124 47554 000 91968
Sub-Total 44224 000 51966 000 96190 3124 181569 59407 340290
State 000 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 000 3471 3471
Central 3815 000 1503 000 5317 801 10171 000 16289
Sub-Total 3815 000 1503 000 5317 801 10171 3471 19760
124953 000 29105 000 154058 23703 75145 000 252907
State 1634400 25000 287920 000 1947320 000 869755 69956 2887031
Private 2168083 108000 55800 000 2331883 000 251400 1312046 3895329
Central 1233537 25000 234406 000 1492943 162000 849622 37900 2542465
Grand Total 5036020 158000 578126 000 5772146 162000 1970777 1419902 9324825
Delhi
Haryana
Himachal Pradesh
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
NORTHERN REGION
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
(As on 30042019)
State Ownership Sector
Mode wise breakup
Grand TotalThermalNuclear Hydro
RES
(MNRE)
Jammu amp Kashmir
Punjab
Rajasthan
Uttar Pradesh
Uttarakhand
Chandigarh
Central - Unallocated
Total (Northern
Region)
(As on 30042019)
Coal Lignite Gas Diesel Total
State 000 000 000 000 000 000 000 005 005
Private 000 000 4800 000 4800 000 000 392 5192
Central 46959 000 1967 000 48926 2600 000 000 51526
Sub-Total 46959 000 6767 000 53726 2600 000 397 56723
State 000 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 000 1447 1447
Central 14141 000 4334 000 18475 700 000 000 19175
Sub-Total 14141 000 4334 000 18475 700 000 1447 20622
State 371000 104000 217782 000 692782 000 77200 6470 776452
Private 726567 50000 396000 000 1172567 000 000 833180 2005747
Central 324243 000 42400 000 366643 55900 000 24330 446873
Sub-Total 1421810 154000 656182 000 2231992 55900 77200 863980 3229072
State 540000 000 000 000 540000 000 170366 8396 718762
Private 617400 000 10000 000 627400 000 000 418040 1045440
Central 334238 000 25700 000 359938 27300 152000 30000 569238
Sub-Total 1491638 000 35700 000 1527338 27300 322366 456436 2333440
State 228000 000 000 000 228000 000 12000 1105 241105
Private 885000 000 000 000 885000 000 000 52430 937430
Central 211075 000 000 000 211075 4800 10000 000 225875
Sub-Total 1324075 000 000 000 1324075 4800 22000 53535 1404410
State 1017000 000 67200 000 1084200 000 285084 38813 1408097
Private 1245600 000 56800 000 1302400 000 48100 880441 2230941
Central 466780 000 227273 000 694053 69000 000 12300 775353
Sub-Total 2729380 000 351273 000 3080653 69000 333184 931553 4414390
State 000 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 000 546 546
Central 19560 000 6634 000 26194 900 000 000 27094
Sub-Total 19560 000 6634 000 26194 900 000 546 27640
233300 000 19759 000 253059 22800 000 000 275859
State 2156000 104000 284982 000 2544982 000 544650 54789 3144421
Private 3474567 50000 467600 000 3992167 000 48100 2186476 6226743
Central 1650295 000 328067 000 1978362 184000 162000 66630 2390992
Grand Total 7280862 154000 1080649 000 8515511 184000 754750 2307894 11762155
Goa
Daman amp Diu
Gujarat
Madhya Pradesh
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
WESTERN REGION
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
ThermalNuclear Hydro
RES
(MNRE)
State Ownership Sector
Mode wise breakup
Grand Total
Chhattisgarh
Maharashtra
Dadra amp Nagar
Naveli
Central - Unallocated
Total (Western
Region)
(As on 30042019)
Coal Lignite Gas Diesel Total
State 501000 000 23540 000 524540 000 167360 5618 697518
Private 387388 000 381318 3680 772386 000 000 743342 1515728
Central 154683 12773 000 000 167456 12727 000 25000 205183
Sub-Total 1043071 12773 404858 3680 1464382 12727 167360 773960 2418429
State 558250 000 000 000 558250 000 247993 4122 810365
Private 83945 000 83182 000 167127 000 000 393644 560771
Central 180685 14927 000 000 195612 14873 000 1000 211485
Sub-Total 822880 14927 83182 000 920989 14873 247993 398766 1582621
State 502000 000 000 12792 514792 000 358660 19389 892841
Private 195850 000 000 2520 198370 000 000 1363591 1561961
Central 242780 40140 000 000 282920 69800 000 000 352720
Sub-Total 940630 40140 000 15312 996082 69800 358660 1382979 2807521
State 000 000 000 15996 15996 000 185650 17290 218936
Private 61500 000 17400 000 78900 000 000 19021 97921
Central 86142 28180 35958 000 150280 36200 000 5000 191480
Sub-Total 147642 28180 53358 15996 245176 36200 185650 41311 508337
State 432000 000 52408 000 484408 000 217820 12270 714498
Private 458767 25000 50310 21170 555247 000 000 1229228 1784475
Central 302532 136420 000 000 438952 144800 000 23190 606942
Sub-Total 1193299 161420 102718 21170 1478607 144800 217820 1264688 3105915
State 000 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 000 000 000
Central 000 10000 000 000 10000 000 000 000 10000
Sub-Total 000 10000 000 000 10000 000 000 000 10000
State 000 000 3250 000 3250 000 000 000 3250
Private 000 000 000 000 000 000 000 314 314
Central 14080 10760 000 000 24840 8600 000 000 33440
Sub-Total 14080 10760 3250 000 28090 8600 000 314 37004
142600 35800 000 000 178400 45000 000 000 223400
State 1993250 000 79198 28788 2101236 000 1177483 58688 3337407
Private 1187450 25000 532210 27370 1772030 000 000 3749140 5521170
Central 1123502 289000 35958 000 1448460 332000 000 54190 1834650
Grand Total 4304202 314000 647366 56158 5321726 332000 1177483 3862018 10693227
Kerala
Andhra Pradesh
Telangana
Karnataka
Total (Southern
Region)
Tamil Nadu
NLC
Puducherry
Central - Unallocated
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
SOUTHERN REGION
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
State Ownership Sector
Mode wise breakup
Grand TotalThermalNuclear Hydro
RES
(MNRE)
(As on 30042019)
Coal Lignite Gas Diesel Total
State 000 000 000 000 000 000 000 7070 7070
Private 28100 000 000 000 28100 000 000 25545 53645
Central 384933 000 000 000 384933 000 11000 000 395932
Sub-Total 413033 000 000 000 413033 000 11000 32615 456647
State 42000 000 000 000 42000 000 13000 405 55405
Private 73000 000 000 000 73000 000 000 3495 76495
Central 39374 000 000 000 39374 000 6100 000 45474
Sub-Total 154374 000 000 000 154374 000 19100 3900 177374
State 540000 000 10000 000 550000 000 98600 12195 660795
Private 243700 000 000 000 243700 000 000 35250 278950
Central 76077 000 000 000 76077 000 41000 000 117077
Sub-Total 859777 000 10000 000 869777 000 139600 47445 1056822
State 000 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 000 000 000
Central 698504 000 000 000 698504 000 18620 000 717124
Sub-Total 698504 000 000 000 698504 000 18620 000 717124
State 42000 000 000 000 42000 000 206192 2630 250822
Private 293900 000 000 000 293900 000 000 47346 341246
Central 163390 000 000 000 163390 000 8900 1000 173290
Sub-Total 499290 000 000 000 499290 000 215092 50976 765358
State 000 000 000 000 000 000 36000 5211 41211
Private 000 000 000 000 000 000 39900 001 39901
Central 8703 000 000 000 8703 000 6400 000 15103
Sub-Total 8703 000 000 000 8703 000 82300 5212 96215
112683 000 000 000 112683 000 8501 000 121184
State 624000 000 10000 000 634000 000 353792 27511 1015303
Private 638700 000 000 000 638700 000 39900 111637 790237
Central 1483664 000 000 000 1483664 000 100520 1000 1585184
Grand Total 2746364 000 10000 000 2756364 000 494212 140148 3390724
Total (Eastern
Region)
Bihar
Jharkhand
West Bengal
DVC
Odisha
Sikkim
Central - Unallocated
HydroOwnership Sector
Mode wise breakup
Grand TotalThermalNuclear
RES
(MNRE)
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
State
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
EASTERN REGION
(As on 30042019)
Coal Lignite Gas Diesel Total
State 000 000 32821 000 32821 000 10000 501 43322
Private 000 000 2450 000 2450 000 000 2650 5100
Central 40852 000 43556 000 84408 000 35708 2500 122616
Sub-Total 40852 000 78827 000 119679 000 45708 5651 171038
State 000 000 000 000 000 000 000 10711 10711
Private 000 000 000 000 000 000 000 2939 2939
Central 3705 000 4682 000 8387 000 11655 000 20042
Sub-Total 3705 000 4682 000 8387 000 11655 13650 33692
State 000 000 000 000 000 000 32200 3253 35453
Private 000 000 000 000 000 000 000 012 012
Central 4560 000 10969 000 15529 000 7227 000 22756
Sub-Total 4560 000 10969 000 15529 000 39427 3265 58221
State 000 000 16950 000 16950 000 000 1601 18551
Private 000 000 000 000 000 000 000 009 009
Central 5610 000 43695 000 49305 000 6849 500 56654
Sub-Total 5610 000 60645 000 66255 000 6849 2110 75214
State 000 000 000 3600 3600 000 000 545 4145
Private 000 000 000 000 000 000 000 344 344
Central 4710 000 7157 000 11867 000 9534 000 21401
Sub-Total 4710 000 7157 3600 15467 000 9534 889 25890
State 000 000 000 000 000 000 000 3067 3067
Private 000 000 000 000 000 000 000 100 100
Central 3210 000 4893 000 8103 000 5733 000 13836
Sub-Total 3210 000 4893 000 8103 000 5733 3167 17003
State 000 000 000 000 000 000 000 3647 3647
Private 000 000 000 000 000 000 000 050 050
Central 3105 000 4046 000 7151 000 9794 000 16945
Sub-Total 3105 000 4046 000 7151 000 9794 3697 20642
11250 000 6362 000 17612 000 14000 000 31612
State 000 000 49771 3600 53371 000 42200 23325 118895
Private 000 000 2450 000 2450 000 000 6104 8554
Central 77002 000 125360 000 202362 000 100500 3000 305862
Grand Total 77002 000 177581 3600 258183 000 142700 32429 433311
Assam
Arunachal Pradesh
Meghalaya
Tripura
Manipur
Nagaland
Mizoram
Central - Unallocated
Total (North-
Eastern Region)
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
NORTH-EASTERN REGION
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
State Ownership Sector
Mode wise breakup
Grand TotalThermalNuclear Hydro
RES
(MNRE)
(As on 30042019)
Coal Lignite Gas Diesel Total
State 000 000 000 4005 4005 000 000 525 4530
Private 000 000 000 000 000 000 000 663 663
Central 000 000 000 000 000 000 000 510 510
Sub-Total 000 000 000 4005 4005 000 000 1698 5703
State 000 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 000 075 075
Central 000 000 000 000 000 000 000 000 000
Sub-Total 000 000 000 000 000 000 000 075 075
State 000 000 000 4005 4005 000 000 525 4530
Private 000 000 000 000 000 000 000 738 738
Central 000 000 000 000 000 000 000 510 510
Grand Total 000 000 000 4005 4005 000 000 1773 5778
Andaman amp
Nicobar
Lakshadweep
Total (Islands)
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
ISLANDS
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
State Ownership Sector
Mode wise breakup
Grand TotalThermalNuclear Hydro
RES
(MNRE)
SrNo Contents Page
1 Executive summary of Target and Achievement of Transmission Lines during 2019-20
20(1)
2 List of Transmission Lines CommissionedReady for commissioning during Apr-2019 20(2)
Section C - Transmission Lines
1 Executive summary of Target and Achievement of Transmission Lines during 2019-20 As on 30-04-19
(All figures in circuit kms)
Ce
ntr
al S
ecto
r
Sta
te S
ecto
r
JV
Pri
va
te S
ecto
r
To
tal
Ce
ntr
al S
ecto
r
Sta
te S
ecto
r
JV
Pri
va
te S
ecto
r
To
tal
Ce
ntr
al S
ecto
r
Sta
te S
ecto
r
JV
Pri
va
te S
ecto
r
To
tal
Ce
ntr
al S
ecto
r
Sta
te S
ecto
r
JV
Pri
va
te S
ecto
r
To
tal
Ce
ntr
al S
ecto
r
Sta
te S
ecto
r
JV
Pri
va
te S
ecto
r
To
tal
Ce
ntr
al
Se
cto
r
Sta
te S
ec
tor
JV
Pri
va
te S
ec
tor
Gra
nd
To
tal
0 0 0 0 0 0 0 0 2727 958 2334 6019 2239 3416 1143 6798 781 10023 0 10804 5747 14397 3477 23621
Apr19 Programme 0 0 0 0 0 0 0 0 577 416 557 1550 60 890 203 1153 0 309 0 309 637 1615 760 3012
Achievement 0 0 0 0 0 0 0 0 53 0 0 53 0 20 0 20 0 401 0 401 53 421 0 474
Upto Apr-19 Programme 0 0 0 0 0 0 0 0 577 416 557 1550 60 890 203 1153 0 309 0 309 637 1615 760 3012
Achievement 0 0 0 0 0 0 0 0 53 0 0 53 0 20 0 20 0 401 0 401 53 421 0 474
20(1)
220 kV Grand Total 800 kV 500 kV
Programme 2019-20
Programme
Achievement
HVDC765 kV 400 kV
Line
1 2 3 4 5 6
1 400 Bhadla (PG) - Bhadla (RVPN) line DC PGCIL 53
53
2 400 LILO of one ckt Jhanor - Navsari at Vav Ss DC GETCO 20
3 220 Banda-Chitrakoot Line DC UPPTCL 226
4 220 Gorakhpur (PG)-Gola line DC UPPTCL 82
5 220 Hapur(765) - Faridnagar line SC UPPTCL 11
6 220 Kalikiri - Madanapalli line DC APTRANSCO 60
7 220LILO of Gr Noida -Noida Sec-129 at Noida
Sec-148DC UPPTCL 1
8 220LILO of one Ckt of Badshahpur Pali at Sec-
65 GurgaonDC HVPNL 3
9 220 Sultanpur-Sangipur LILO Section at Amethi DC UPPTCL 18
421
0
474
20(2)
Grand Total
2Transmission Lines (220 kV and above) CommissionedReady for commissioning During Apr-2019
Voltage
Level (kV)Name of Transmission Lines
Circuit
Type
Executing
Agency
CENTRAL SECTOR
Total of CENTRAL SECTOR
STATE SECTOR Sector
Total of STATE SECTOR
PRIVATE SECTOR
Total of PRIVATE SECTOR
SlNo
Length(CKm)
As on 30-04-19
SN Contents Page
1 Executive summary of Target and Achievement of Substations during 2019-20 21(1)
2Sub Stations (220 kV and above) commissionedready for commisssioning during Apr-
201921(2)
Section D - Sub Stations
1 Executive summary of Target and Achievement of Substations during 2019-2020 As on 30-04-19
(All figures in circuit MVA)
Ce
ntr
al S
ecto
r
Sta
te S
ecto
r
JV
Pri
va
te S
ecto
r
To
tal
Ce
ntr
al S
ecto
r
Sta
te S
ecto
r
JV
Pri
va
te S
ecto
r
To
tal
Ce
ntr
al S
ecto
r
Sta
te S
ecto
r
JV
Pri
va
te S
ecto
r
To
tal
Ce
ntr
al S
ecto
r
Sta
te S
ecto
r
JV
Pri
va
te S
ecto
r
To
tal
Ce
ntr
al S
ecto
r
Sta
te S
ecto
r
JV
Pri
va
te S
ecto
r
To
tal
Ce
ntr
al S
ec
tor
Sta
te S
ec
tor
JV
Pri
va
te S
ec
tor
Gra
nd
To
tal
3000 0 0 3000 0 0 0 0 18000 3000 6000 27000 5205 19665 4260 29130 800 21786 0 22586 27005 44451 10260 81716
Apr19 Programme 0 0 0 0 0 0 0 0 3000 0 3000 6000 0 1000 2000 3000 0 800 0 800 3000 1800 5000 9800
Achievement 0 0 0 0 0 0 0 0 500 0 0 500 815 1980 0 2795 0 1305 0 1305 1315 3285 0 4600
Upto Apr-19 Programme 0 0 0 0 0 0 0 0 3000 0 3000 6000 0 1000 2000 3000 0 800 0 800 3000 1800 5000 9800
Achievement 0 0 0 0 0 0 0 0 500 0 0 500 815 1980 0 2795 0 1305 0 1305 1315 3285 0 4600
21(1)
220 kV Grand Total 800 kV 500 kV
Programme 2019-20
Programme
Achievement
HVDC765 kV 400 kV
As on 30-04-19
Sl Voltage Ratio Capacity
No (kVkV) (MWMVA)
1 2 3 4 5
1 Bhadla SS (3x1500 3x500 MVA) 765400 PGCIL 500
2 Extn at Tumkur (Pavagada ) PS (2x500 MVA) 400220 PGCIL 500
3 Bongaigaon (2nd ICT) Ss 400220 PGCIL 315
Total of CENTRAL SECTOR 1315
4 Motiram Adda Gorakhpur (Aug) (Additional TF) 400220 UPPTCL 240
5 Muradnagar-II Ghaziabad (Aug) (Additional TF) 400220 UPPTCL 240
6 Noida Sec- 148 GBNagar (New) 400220 UPPTCL 5007 Sarnath Varanasi (Aug) TF- II (500-315) 400220 UPPTCL 1858 Sarojininagar Lucknow Aug) TF- II (500-315) 400220 UPPTCL 185
9 Unnao (Aug) TF-III 400220 UPPTCL 31510 Nawada SS 400220 HVPNL 31511 Kharepatan SS 22033 MSETCL 2512 Prathipadu SS 220132 APTRANSCO 10013 Pali Ss 22066 HVPNL 160
14 A-5 Faridabad Ss 22066 HVPNL 60
15 Rentachintala Ss Aug(3X100-2x100) 220132 APTRANSCO 10016 Amethi Ss 220132 UPPTCL 160
17 Gajokhar Varanasi (Aug) TF- II (160-100) 220132 UPPTCL 60
18 Gola Gorakhpur (New) 220132 UPPTCL 160
19 Khurja Bulandshahr (Aug) TF- II (200-160) 220132 UPPTCL 40
20 RC Green GB Nagar (Aug) TF-II (160-100) 220132 UPPTCL 60
21 Sikandrabad Bulandshahr (Aug) (Additional TF) 220132 UPPTCL 160
22 Sitapur (Aug) (Additional TF) 220132 UPPTCL 160
23 Sohawal Ayodhya (Aug) TF-II (160-100) 220132 UPPTCL 60
TOTAL STATE SECTOR 3285
GRAND TOTAL 4600
21(2)
CENTRAL SECTOR
STATE SECTOR
2Sub-Stations (220 kV and above) CommissionedReady for commissioning During Apr-2019
Name of Sub Stations Executing Agency
SN Contents Page
1 Electricity Generation (MU) Targets and Achievements for 2019-20 22
Section E - Electricity Generation
Programme Achievement Ach Programme Achievement Ach
Central Sector 37545100 3177900 3129530 9848 3177900 3129530 9848
State Sector 37498600 3322500 2950558 8881 3322500 2950558 8881
PvtIPP Sector 37346200 3236400 3195940 9875 3236400 3195940 9875
PvtUTL Sector 1823100 159300 165579 10394 159300 165579 10394
Total 114213000 9896100 9441607 9541 9896100 9441607 9541
Central Sector 5661700 386100 481390 12468 386100 481390 12468
State Sector 6680500 498200 536514 10769 498200 536514 10769
PvtIPP Sector 1206900 57300 80405 14032 57300 80405 14032
PvtUTL Sector 144100 12300 10930 8886 12300 10930 8886
Total 13693200 953900 1109239 11628 953900 1109239 11628
Central Sector 4472000 367300 317765 8651 367300 317765 8651
Total 4472000 367300 317765 8651 367300 317765 8651
Bhutan Import 621800 17500 24396 13941 17500 24396 13941
Central Sector 47678800 3931300 3928685 9993 3931300 3928685 9993
State Sector 44179100 3820700 3487072 9127 3820700 3487072 9127
Pvt Sector 40520300 3465300 3452854 9964 3465300 3452854 9964
Total 133000000 11234800 10893007 9696 11234800 10893007 9696
Provisional based on actual-cum-Assesment
Figs in MU
Cummulative
Achievement
Cummulative
Achievement
Mar-19 Mar-18 Upto Mar-2019 Upto Mar-2018
984785 869291 12675910 10183949
22
1 Electricity Generation (MU) Targets and Achievememts for 2019-20
All India Energy Generation During Apr-19 to Apr-19 (MU)
Target (2019-20)Apr-19 to Apr-19
Sector
Hydro
Thermal
Nuclear
Renewable Energy Generation
Achievement
Apr-2019
98961
95393673
112348
94416
11092
3178
108930
0
20000
40000
60000
80000
100000
120000
Thermal Hydro Nuclear Total
Programme
Achievement
SN Contents Page
1 Energy Power Supply Position (Provisional) for Apr-2019 and during Apr-19 to Apr-19 23
2 Peak Power Supply Position (Provisional) for Apr-2019 and during Apr-19 to Apr-19 24
3 Energy Power Supply Position (Revised) for Mar-2019 and during Apr-19 to Mar-19 25
4 Peak Power Supply Position (Revised) for Mar-2019 and during Apr-19 to Mar-19 26
5 Notified Power cuts Restrictions on Industries during Apr-2019 27
6 Power Supply to Agricultural Sector during Apr-2019 28
Section F - Power supply position
आकड़ मममलयन यननट नट Figures in MU net
ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied
कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )
चडीगढ़ Chandigarh 117 117 0 00 117 117 0 00
दिलली Delhi 2698 2698 1 00 2698 2698 1 00
हरियजणज Haryana 3773 3773 0 00 3773 3773 0 00
दहमजचल परिश Himachal Pradesh 777 777 0 00 777 777 0 00
रमम कशमीि Jammu amp Kashmir 1604 1296 308 192 1604 1296 308 192
परजब Punjab 3646 3646 0 00 3646 3646 0 00
िजरसथजन Rajasthan 6210 6208 2 00 6210 6208 2 00
उतति परिश Uttar Pradesh 10179 10148 32 03 10179 10148 32 03
उततिजखड Uttarakhand 1120 1120 0 00 1120 1120 0 00
उततरी कषतर Northern Region 30094 29786 308 10 30094 29786 308 10
छततीसगढ़ Chhattisgarh 2684 2676 8 03 2684 2676 8 03
गरिजत Gujarat 10718 10718 0 00 10718 10718 0 00
मधय परिश Madhya Pradesh 6006 6006 0 00 6006 6006 0 00
महजिजषटर Maharashtra 14308 14308 0 00 14308 14308 0 00
िमन औि दिउ Daman amp Diu 220 220 0 00 220 220 0 00
िजिि व नगि हवली Dadra amp Nagar Haveli 552 552 0 00 552 552 0 00
गोवज Goa 388 388 0 00 388 388 0 00
पशचिमी कषतर Western Region 34875 34868 8 00 34875 34868 8 00
आनधर परिश Andhra Pradesh 5708 5708 0 00 5708 5708 0 00
तलगजनज Telangana 5725 5725 0 00 5725 5725 0 00
कनजाटक Karnataka 7003 7003 0 00 7003 7003 0 00
किल Kerala 2402 2400 2 01 2402 2400 2 01
तममल नजड Tamil Nadu 10010 10010 0 00 10010 10010 0 00
पडचिी Puducherry 263 263 0 00 263 263 0 00
लकष-दवीप Lakshadweep 4 4 0 0 4 4 0 0
दकषकषणी कषतर Southern Region 31111 31109 2 00 31111 31109 2 00
बबहजि Bihar 2589 2589 0 00 2589 2589 0 00
िजमोिि घजटी ननगम DVC 1772 1772 0 00 1772 1772 0 00
झजिखणड Jharkhand 689 689 0 00 689 689 0 00
ओडडशज Odisha 2689 2689 1 00 2689 2689 1 00
पशशचम बगजल West Bengal 5075 5075 0 00 5075 5075 0 00
मसशककम Sikkim 37 37 0 00 37 37 0 00
अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 7 29 27 2 7
परवी कषतर Eastern Region 12851 12850 1 00 12851 12850 1 00
अरणजचल परिश Arunachal Pradesh 66 66 0 05 66 66 0 05
असम Assam 766 709 57 75 766 709 57 75
मणणपि Manipur 68 67 1 15 68 67 1 15
मघजलय Meghalaya 170 160 10 59 170 160 10 59
ममज़ोिम Mizoram 54 53 0 08 54 53 0 08
नजगजलड Nagaland 54 54 0 08 54 54 0 08
बिपिज Tripura 122 120 1 12 122 120 1 12
उततर-परवी कषतर North-Eastern Region 1300 1228 71 55 1300 1228 71 55
समपणण भारत All India 110231 109842 389 04 110231 109842 389 04
23
ऊरजा पनत ा म कमी ऊरजा पनत ा म कमीEnergy not Supplied
Excludes energy exported to Bangladesh
Energy not Supplied
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
ऊराण वरवदयत आपरत ण शथिरत ररपोरण (परवाणरवलोकन) Energy Power Supply Position Report (Provisional)
राजयState
अपरल 2019 April2019 अपरल2019 -अपरल2019 April2019 to April2019
अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met
कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )
चडीगढ़ Chandigarh 256 256 0 00 256 256 0 00
दिलली Delhi 5664 5664 0 00 5664 5664 0 00
हरियजणज Haryana 8127 8127 0 00 8127 8127 0 00
दहमजचल परिश Himachal Pradesh 1387 1387 0 00 1387 1387 0 00
रमम कशमीि Jammu amp Kashmir 2826 2261 565 200 2826 2261 565 200
परजब Punjab 7015 7015 0 00 7015 7015 0 00
िजरसथजन Rajasthan 10560 10560 0 00 10560 10560 0 00
उतति परिश Uttar Pradesh 19935 19935 0 00 19935 19935 0 00
उततिजखड Uttarakhand 1922 1922 0 00 1922 1922 0 00
उततरी कषतर Northern Region 54476 53985 491 09 54476 53985 491 09
छततीसगढ़ Chhattisgarh 4596 4574 22 05 4596 4574 22 05
गरिजत Gujarat 17871 17865 6 00 17871 17865 6 00
मधय परिश Madhya Pradesh 10018 10018 0 00 10018 10018 0 00
महजिजषटर Maharashtra 23158 23150 8 00 23158 23150 8 00
िमन औि दिउ Daman amp Diu 341 340 1 02 341 340 1 02
िजिि व नगि हवली Dadra amp Nagar Haveli 818 818 0 00 818 818 0 00
गोवज Goa 594 594 0 00 594 594 0 00
पशचिमी कषतर Western Region 56242 56222 20 00 56242 56222 20 00
आनधर परिश Andhra Pradesh 9151 9151 0 00 9151 9151 0 00
तलगजनज Telangana 10191 10191 0 00 10191 10191 0 00
कनजाटक Karnataka 12681 12681 0 00 12681 12681 0 00
किल Kerala 4309 4300 8 02 4309 4300 8 02
तममल नजड Tamil Nadu 15972 15972 0 00 15972 15972 0 00
पडचिी Puducherry 482 480 2 05 482 480 2 05
लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0
दकषकषणी कषतर Southern Region 49155 49103 52 01 49155 49103 52 01
बबहजि Bihar 5357 5357 0 00 5357 5357 0 00
िजमोिि घजटी ननगम DVC 3039 3039 0 00 3039 3039 0 00
झजिखणड Jharkhand 1266 1266 0 00 1266 1266 0 00
ओडडशज Odisha 5389 5389 0 00 5389 5389 0 00
पशशचम बगजल West Bengal 8666 8666 0 00 8666 8666 0 00
मसशककम Sikkim 100 100 0 00 100 100 0 00
अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7
परवी कषतर Eastern Region 23349 23349 0 00 23349 23349 0 00
अरणजचल परिश Arunachal Pradesh 139 136 3 22 139 136 3 22
असम Assam 1712 1667 45 26 1712 1667 45 26
मणणपि Manipur 197 188 9 46 197 188 9 46
मघजलय Meghalaya 336 336 0 00 336 336 0 00
ममज़ोिम Mizoram 116 113 3 26 116 113 3 26
नजगजलड Nagaland 157 131 26 166 157 131 26 166
बिपिज Tripura 292 291 1 03 292 291 1 03
उततर-परवी कषतर North-Eastern Region 2848 2780 68 24 2848 2780 68 24
समपणण भारत All India 177411 176810 601 03 177411 176810 601 03
24
मजग की पनत ा म कमी Demand not Met
Excludes the supply to Bangladesh
राजयStateअपरल 2019 April2019
मजग की पनत ा म कमी Demand not Met
अधिकतम वरवदयत आपरत ण शथिरत ररपोरण (परवाणरवलोकन) Peak Power Supply Position Report (Provisional)
आकड़ मगज वजट नट Figures in MW netअपरल2019 -अपरल2019 April2019 to April2019
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
आकड़ मममलयन यननट नट Figures in MU net
ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied
कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )
चडीगढ़ Chandigarh 96 96 0 00 1561 1561 0 00
दिलली Delhi 1931 1930 1 00 32299 32282 17 01
हरियजणज Haryana 3658 3658 0 00 53665 53665 0 00
दहमजचल परिश Himachal Pradesh 832 830 2 02 9850 9618 232 24
रमम कशमीि Jammu amp Kashmir 1767 1414 353 200 19593 15868 3725 190
परजब Punjab 3585 3585 0 00 55288 55275 13 00
िजरसथजन Rajasthan 6774 6770 4 01 79826 79637 189 02
उतति परिश Uttar Pradesh 8754 8691 63 07 117101 116118 984 08
उततिजखड Uttarakhand 1067 1067 0 00 13845 13753 92 07
उततरी कषतर Northern Region 28464 28041 423 15 383028 377776 5251 14
छततीसगढ़ Chhattisgarh 2464 2457 8 03 26130 26076 54 02
गरिजत Gujarat 9890 9890 0 00 116588 116572 15 00
मधय परिश Madhya Pradesh 6236 6236 0 00 75667 75665 2 00
महजिजषटर Maharashtra 13631 13631 0 00 158285 158148 137 01
िमन औि दिउ Daman amp Diu 221 221 0 00 2557 2557 0 00
िजिि व नगि हवली Dadra amp Nagar Haveli 553 553 0 00 6317 6317 0 00
गोवज Goa 362 362 0 00 4283 4280 3 01
पशचिमी कषतर Western Region 33357 33349 8 00 389827 389615 212 01
आनधर परिश Andhra Pradesh 6072 6071 1 00 63735 63677 58 01
तलगजनज Telangana 6930 6929 1 00 66697 66635 62 01
कनजाटक Karnataka 7614 7612 1 00 71759 71690 69 01
किल Kerala 2489 2488 1 00 25029 24911 118 05
तममल नजड Tamil Nadu 10247 10245 2 00 109375 109273 102 01
पडचिी Puducherry 252 251 1 04 2761 2751 10 03
लकष-दवीप Lakshadweep 4 4 0 0 46 46 0 0
दकषकषणी कषतर Southern Region 33605 33597 8 00 339355 338938 417 01
बबहजि Bihar 2319 2318 1 00 30052 29827 225 07
िजमोिि घजटी ननगम DVC 1773 1772 1 00 22365 21995 369 17
झजिखणड Jharkhand 698 697 1 01 8682 8461 221 25
ओडडशज Odisha 2583 2582 1 00 31810 31781 30 01
पशशचम बगजल West Bengal 4585 4584 2 00 52237 52078 159 03
मसशककम Sikkim 41 41 0 00 513 512 0 01
अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 67 346 323 23 67
परवी कषतर Eastern Region 11999 11995 5 00 145658 144654 1004 07
अरणजचल परिश Arunachal Pradesh 61 60 0 06 864 855 9 10
असम Assam 680 656 23 34 9532 9204 328 34
मणणपि Manipur 68 68 1 09 916 906 10 11
मघजलय Meghalaya 173 173 0 03 1955 1953 1 01
ममज़ोिम Mizoram 50 49 0 09 668 661 8 12
नजगजलड Nagaland 58 57 1 20 902 809 93 103
बिपिज Tripura 150 150 0 00 1859 1837 21 11
उततर-परवी कषतर North-Eastern Region 1240 1214 26 21 16696 16225 471 28
समपणण भारत All India 108665 108196 469 04 1274564 1267209 7355 06
Note The revised data for March 2019 is not avaliable
Excludes energy exported to Bangladesh
राजयState
ऊराण वरवदयत आपरत ण शथिरत ररपोरण (परवाणरवलोकन) Energy Power Supply Position Report (Provisional)
25
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
Energy not Supplied Energy not Supplied
मािण2019 March2019 अपरल2018 -मािण2019 April2018 to March2019
ऊरजा पनत ा म कमी ऊरजा पनत ा म कमी
अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met
कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )
चडीगढ़ Chandigarh 223 223 0 00 369 369 0 00
दिलली Delhi 4016 4016 0 00 7016 7016 0 00
हरियजणज Haryana 6544 6544 0 00 10270 10270 0 00
दहमजचल परिश Himachal Pradesh 1683 1683 0 00 1700 1700 0 00
रमम कशमीि Jammu amp Kashmir 3277 2622 655 200 3277 2622 655 200
परजब Punjab 6564 6564 0 00 12638 12638 0 00
िजरसथजन Rajasthan 11885 11885 0 00 13276 13276 0 00
उतति परिश Uttar Pradesh 16220 16220 0 00 20498 20062 436 21
उततिजखड Uttarakhand 2002 2002 0 00 2216 2216 0 00
उततरी कषतर Northern Region 47925 47356 569 12 63166 61726 1440 23
छततीसगढ़ Chhattisgarh 4444 4128 316 71 4444 4270 174 39
गरिजत Gujarat 16263 16263 0 00 17053 16963 90 05
मधय परिश Madhya Pradesh 12328 12323 5 00 13815 13815 0 00
महजिजषटर Maharashtra 22361 22291 70 03 23864 23254 610 26
िमन औि दिउ Daman amp Diu 336 336 0 01 357 356 1 02
िजिि व नगि हवली Dadra amp Nagar Haveli 800 799 1 01 816 815 1 01
गोवज Goa 538 538 0 00 596 596 0 00
पशचिमी कषतर Western Region 53132 52965 167 03 56675 55821 853 15
आनधर परिश Andhra Pradesh 8977 8977 0 00 9459 9453 6 01
तलगजनज Telangana 10471 10471 0 00 10815 10815 0 00
कनजाटक Karnataka 12841 12841 0 00 12841 12841 0 00
किल Kerala 4264 4228 36 09 4264 4228 36 09
तममल नजड Tamil Nadu 15712 15712 0 00 15712 15712 0 00
पडचिी Puducherry 427 412 15 34 427 412 15 34
लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0
दकषकषणी कषतर Southern Region 49464 49464 0 00 49464 49464 0 00
बबहजि Bihar 4633 4633 0 00 5115 5084 31 06
िजमोिि घजटी ननगम DVC 3035 3035 0 00 3035 3035 0 00
झजिखणड Jharkhand 1210 1210 0 00 1339 1291 48 36
ओडडशज Odisha 4827 4827 0 00 5357 5357 0 00
पशशचम बगजल West Bengal 8287 8287 0 00 9130 9123 7 01
मसशककम Sikkim 100 100 0 00 106 106 0 00
अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7
परवी कषतर Eastern Region 21658 21658 0 00 23141 22733 408 18
अरणजचल परिश Arunachal Pradesh 133 131 2 15 138 138 0 01
असम Assam 1539 1508 31 20 1865 1809 56 30
मणणपि Manipur 204 199 5 25 219 216 3 12
मघजलय Meghalaya 357 357 0 00 374 372 1 04
ममज़ोिम Mizoram 108 105 3 28 121 119 2 17
नजगजलड Nagaland 127 125 2 16 156 138 18 116
बिपिज Tripura 249 249 0 00 298 293 5 17
उततर-परवी कषतर North-Eastern Region 2540 2535 5 02 2967 2850 117 39
समपणण भारत All India 169464 168745 719 04 177022 175528 1494 08
Note The revised data for March 2019 is not avaliable 26
अधिकतम वरवदयत आपरत ण शथिरत ररपोरण (परवाणरवलोकन) Peak Power Supply Position Report (Provisional)
आकड़ मगज वजट नट Figures in MW net
राजयStateमािण2019 March2019 अपरल2018 -मािण2019 April2018 to March2019
मजग की पनत ा म कमी मजग की पनत ा म कमी Demand not MetDemand not Met
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
Excludes the supply to Bangladesh
अपरल 2019 April2019 अपरल2018 -मािण2019 April2019 to April2019
उततरी कषतर Northern Region
चडीगढ़ Chandigarh(Data Not Received)दिलली Delhi
हरियजणज Haryana
दहमजचल परिश Himachal Pradeshरमम कशमीि Jammu amp Kashmir(Data
Not Received)परजब Punjab
िजरसथजन Rajasthanउतति परिश Uttar Pradesh
उततिजखड Uttarakhand
पशचिमी कषतर Western Region
छततीसगढ़ Chhattisgarh
Apr-Nov 2018- No cuts
Maximum Demand cut-58MW
Energy cut- 00020-00032 MUsday
गरिजत Gujarat
मधय परिश Madhya Pradesh
महजिजषटर Maharashtra
गोवज Goa
दकषकषणी कषतर Southern Region
आनधर परिश Andhra Pradesh
तलगजनज Telangana
कनजाटक Karnataka
किल Kerala
तममल नजड Tamil Nadu
पडचिी Puducherryपरवी कषतर Eastern Region
बबहजि Bihar
झजिखणड Jharkhand
ओडडशज Odisha
पशशचम बगजल West Bengal
No N
otifie
d Cu
ts
27
मािण 2019 म इडथरीर पर वरवदयत करौती का वरवरवरण Notified Power CutsRestrictions on Industries during April2019
राजय कषतर State Regionऊराणमाग करौती EnergyDemand Cut
No N
otifie
d Cu
tsNo
Notifie
d Cu
ts
अपरल2019 April 2019 अपरल2019 -अपरल2019 April2019 to April2019
उततरी कषतर Northern Region
चडीगढ़ Chandigarh Data not received Data not received
दिलली Delhi Data not received Data not received
हरियजणज Haryana 0811 hrsday 0811 hrsday
दहमजचल परिश Himachal Pradesh HPSEBL has only 2 agriculture consumers and uninterrupted
power is being supplied to agriculture sector
HPSEBL has only 2 agriculture consumers and uninterrupted
power is being supplied to agriculture sector
रमम कशमीि Jammu amp Kashmir Data not received Data not received
परजब Punjab 379 hrsday 379 hrsday
िजरसथजन Rajasthan 0630 hrsday 0630 hrsday
उतति परिश Uttar Pradesh 2157 hrsday 2157 hrsday
उततिजखड Uttarakhand 2359 hrsday 2359 hrsday
पशचिमी कषतर Western Region
छततीसगढ़ Chhattisgarh 18 hrsday 18 hrsday
गरिजत Gujarat 8 hrsday 8 hrsday
मधय परिश Madhya Pradesh Three-Phase Supply(Irrigation)- 0953 hrs day Three-Phase
(Mixed) Supply - 2334 hrs day
Three-Phase Supply(Irrigation)- 0953 hrs day Three-Phase
(Mixed) Supply - 2334 hrs day
महजिजषटर Maharashtra Three-Phase Supply(Irrigation)- 9 hrs day Three-Phase Supply(Irrigation)- 9 hrs day
गोवज Goa No restriction No restriction
दकषकषणी कषतर Southern Region
आनधर परिश Andhra Pradesh 07 hrsday 07 hrsday
तलगजनज Telangana 24 hrsday 24 hrsday
कनजाटक Karnataka 6 hrsday 6 hrsday
किल Kerala No Restrictions No Restrictions
तममल नजड Tamil Nadu 9 hrsday (6 hrs during day time and 3 hrs during night time) 9 hrsday (6 hrs during day time and 3 hrs during night time)
पडचिी Puducherry No Restrictions No Restrictions
परवी कषतर Eastern Region
बबहजि Bihar 18 hrsday 18 hrsday
झजिखणड Jharkhand 20 hrsday 20 hrsday
ओडडशज Odisha 24 hrsday 24 hrsday
पशशचम बगजल West Bengal 23 hrsday 23 hrsday
28
मारच 2019 कषि कषतर को षिदयत आपरतच का षििरण Power Supply to Agricultural Sector during March2019
राजय कषतर State Regionऔसत वरवदयत आपरत ण घनरो म Average Hours of Supply
On segregated feeders
SNo Contents Page
1 Growth of Installed Capacity since 6th Plan 29
2 Progress of Transmission Sector since 6th Plan 30
3 All India Yearly Coal consumption for Power Generation (Utilities)
4 All India Annual Per Capita Consumption of Electricity since -2006
5 Average cost of power supply amp Average realisation (Paisakwh)
6 Growth of Rural Electrification amp Pump Sets Energisation
7 Status of Hydro Schemes Cleared by the CEA in Apr-2019
Section G - Growth of Power Sector
31
32
(In MW)
Coal Gas Diesel Total
End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472
End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634
End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537
End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596
End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921
End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703
End of 12th Plan 19216288 2532938 83763 21832988 6780 4447842 50018 31960630
Up to Apr-2019 20070450 2493722 63763 22627934 678000 4539922 7764163 35610019
Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-17) = 51529 MW
Electricity Generation (MU) Targets and Achievements for 2016-17
Coal Gas Diesel Nuclear Hydro Res Total
2007045 2493722 637629 678000 453992 77641625 22925174
29
1 Growth of Installed Capacity Since 6th Plan
Plan YearThermal
Nuclear Hydro RES (MNRE) Total
2007045
2493722637629
678000
4539922
77641625
Total Installed Capacity 35610019 MW
Coal Gas Diesel Nuclear Hydro Res
Progress of Transmission Sector in the Country up to April 2019
1 TRANSMISSION LINES (All fig in CKM)
At the end of
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
6th plan 0 0 0 0 0 0 0 0 0 0 0 0 1831 4198 0 6029 1641 44364 0 46005 3472 48562 0 52034
7th plan 0 0 0 0 0 0 0 0 0 0 0 0 13068 6756 0 19824 4560 55071 0 59631 17628 61827 0 79455
8th plan 0 0 0 0 1634 0 0 1634 0 0 0 0 23001 13141 0 36142 6564 73036 0 79600 31199 86177 0 117376
9th plan 0 0 0 0 3234 1504 0 4738 751 409 0 1160 29345 20033 0 49378 8687 88306 0 96993 42017 110252 0 152269
10th plan 0 0 0 0 4368 1504 0 5872 1775 409 0 2184 48708 24730 0 73438 9444 105185 0 114629 64295 131828 0 196123
11th Plan 0 0 0 0 5948 1504 1980 9432 4839 411 0 5250 71023 30191 5605 106819 10140 125010 830 135980 91950 157116 8415 257481
12th Plan 6124 0 0 6124 5948 1504 1980 9432 25465 1177 4598 31240 92482 48240 17065 157787 11014 151276 978 163268 141033 202197 24621 367851
13th Plan (Up
to Mar2019)6124 0 0 6124 5948 1504 1980 9432 33692 1512 6605 41809 101335 58238 21173 180746 11734 162552 1010 175296 158833 223806 30768 413407
13th Plan (Up
to Apr-19)6124 0 0 6124 5948 1504 1980 9432 33745 1512 6605 41862 101335 58258 21173 180766 11734 162953 1010 175697 158886 224227 30768 413881
27150 600 MW of 132 kV Inter-Regional power transmission capacity links which are operated radially from time to time is not added in the total
75050
47900
24000
99050
30
Grand Total
Note - The figure upto the end of 10th plan in for stringing progress including the lines not commissioned Now only commissioned lines are reckoned Accordingly the figure for 10th plan (end) may read
as 187555 after adjusting with (-) 10852 Ckm
Inter-regional Power Transfer Capacity (MW)
plusmn 800 kV HVDC plusmn 500 kV HVDC 765 kV 400 kV 220 kV
IR addition in 12th
Plan (up to March
2017)
Inter-regional
Transmission
Capacity at the end
of Plan Period 2017-
22 (as on April19)
IR at the end of 11th
PlanIR at the end of 12th
Plan
IR Capacity Addition
at the end of Plan
Period 2017-22 (Till
April 19)
2004-05 27800
2005-06 28100
2006-07 30200
2007-08 33000
2008-09 35500
2009-10 36700
2010-11 38700
2011-12 41756
2012-13 45460
2013-14 48940
2014-15 53040
2015-16 54590
2016-17 57430
2017-18 60800
2018-19 62890
Year
2005-06
2006-07
2007-08
2008-09
2009-10
2010-11
2011-12
2012-13
2013-14
2014-15
2015-16
2016-17
2017-18
2018-19
2004-05 254 209 7568
2005-06 260 221 7636
2006-07 276 227 7423
2007-08 293 239 7727
2008-09 340 263 8713
2009-10 355 268 8870
2010-11 398 303 11975
2011-12 455 330 13514
2012-13 501 376 14867
2013-14 518 175
2014-15 520
Source- PFC Reports on the performance of State Power Utilities 31
1181
7335
7786
91441
8188
88363
957
1010
1075
1122
1149
(GrossGen+ Net Import) Mid-year population Provisional
5 Average cost of power supply amp average realization ( paiseKWH )
Yearcost of supply
(paiseunit)
Realization(paiseunit)
Including AgricultureOnly
Agriculture
6719
7171
3 All India yearly Coal Consumption for Power Generation (Utilities)
YEARCoal Consumption
Million Tonnes
4 All India Annual per Capita consumption of Electricity Since 2006
Per Capita Consumption ( kWh)
6314
Sl
NoExecuting Agency
Installed
Capacity (MW)Cost (Rs crore)
Date of
Clearance
32
Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as
Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received
from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made
available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified
villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is
independent of the earlier published reports
No Hydro Electric Project has been issued concurrenceAppraisal letter by CEA during April 2019
7 Status of Hydro Schemes Cleared by the CEA in Apr-2019
Name of Scheme
1999-002000-01
297594
010408 to 310309010409 to 310310
10th Plan
2005-062006-07
322968331020
6 Growth Of Rural Electrification amp Pumpsets Energisation
Plan Year
9th Plan2002-03
134092626
4111
Pump Sets Energised Villages Electricfied (Nos)
2001-02
284064367244
1218
27801997-981998-99
3207
482864
12632
1576036
4451722594
15455554
2314176
397343611750
2093311060316074
65109527813884
46708
18423975
499150
2003-042004-05
5743
9769
Cumu upto End of 10th Plan
010407 to 310308
010410 to 310311557976840909
010411 to 310312
412667
86293726
No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification
since 2004-05
65291374575 296361511th Plan
Cumu upto End of 11th Plan
596556 21212860
557439Cummulative up to end of 12th Plan
SN Contents Page
1 Rate of sale of power for the year 2016-17 33-41
RATE OF SALE OF POWER FOR THE YEAR 2016-17
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) NORTHERN REGION
CENTRAL SECTOR
BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 18000 66900 19800
CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 54000 222400 21600
CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 30000 144400 19600
CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 23100 91700 42600
PARBATI - III HPS NHPC LTD HYDRO-HYDRO 52000 68200 54800
DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 28000 95600 30000
CHUTAK NHPC LTD HYDRO-HYDRO 4400 22000 79800
DULHASTI HPS NHPC LTD HYDRO-HYDRO 39000 228000 56400
SALAL HPS NHPC LTD HYDRO-HYDRO 69000 342300 11000
TANAKPUR HPS NHPC LTD HYDRO-HYDRO 9420 43000 29600
URI HPS -I NHPC LTD HYDRO-HYDRO 48000 280300 16000
URI HPS - II NHPC LTD HYDRO-HYDRO 24000 147300 48600
NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 4500 24600 88200
SEWA - II NHPC LTD HYDRO-HYDRO 12000 47100 43400
ANTA CCPP NTPC LTD THERMAL-GASN 41930 67539 32400
AURAIYA CCPP NTPC LTD THERMAL-GASN 66336 53501 39100
BADARPUR TPS NTPC LTD THERMAL-COAL 70500 159153 44800
DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 84000 296170 42300
DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 98000 526686 46300
DADRI CCPP NTPC LTD THERMAL-GASHSD 82978 227469 33000
FARIDABAD CCPP NTPC LTD THERMAL-GASN 43159 115577 30800
RIHAND STPS I NTPC LTD THERMAL-COAL 100000 596766 24500
RIHAND STPS II NTPC LTD THERMAL-COAL 100000 737069 24600
RIHAND STPS III NTPC LTD THERMAL-COAL 100000 706546 30600
SINGRAULI STPS NTPC LTD THERMAL-COAL 200000 1394068 20400
TANDA TPS NTPC LTD THERMAL-COAL 44000 295438 40800
UNCHAHAR TPS I NTPC LTD THERMAL-COAL 42000 256454 39800
UNCHAHAR TPS II NTPC LTD THERMAL-COAL 42000 273577 38900
UNCHAHAR TPS III NTPC LTD THERMAL-COAL 21000 142780 43000
KOLDAM NTPC LTD HYDRO-HYDRO 80000 363260 43600
NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 303575 25841
RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 108000 668677 35374
NJHPS SJVNL HYDRO-HYDRO 150000 699496 23820
RAMPUR HPS SJVNL HYDRO-HYDRO 41202 195982 32260
TEHRI HPP THDC HYDRO-HYDRO 100000 272543 51800
KOTESHWAR HEP THDC HYDRO-HYDRO 40000 106244 53400
IGSTPS JHAJJAR ARAVALI P CPL THERMAL-COAL 150000 510429 49490
NEYVELI BARSINGSAR NEYVELI LIG CORP LTD THERMAL-LIG 25000 127520 38040
STATE SECTOR
PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 21000 14222 48200
PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 21000 19205 48400
PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 25000 102257 42600
PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 25000 62107 41800
DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 60000 312213 41000
RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 120000 35767442200
WYC HYDEL STATION HPGCL HYDRO-HYDRO 6240 20365 24900
GIRI POWER HOUSE HPSEB HYDRO-HYDRO 6000 13958 7600
ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 1695 5467 11900
BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 12000 18528 6700
GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 2250 7462 22500
BASSI POWER HOUSE HPSEB HYDRO-HYDRO 6600 29649 7500
BINWA POWER HOUSE HPSEB HYDRO-HYDRO 600 2749 19300
ANNEXURE-I
RATE OF SALE OF POWER FOR THE YEAR 2016-2017
Page 33
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) GAJ POWER HOUSE HPSEB HYDRO-HYDRO 1050 2914 26700
BANER POWER HOUSE HPSEB HYDRO-HYDRO 1200 2864 16200
HOLI POWER HOUSE HPSEB HYDRO-HYDRO 300 616 22500
THIROT POWER HOUSE HPSEB HYDRO-HYDRO 450 1126 22500
KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 1200 3064 22500
LARJI POWER HOUSE HPSEB HYDRO-HYDRO 12600 53677 23700
NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 250 750 31000
CHABA POWER HOUSE HPSEB HYDRO-HYDRO 175 465 23300
RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 150 101 13400
SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 200 000 22500
KILLAR HPSEB HYDRO-HYDRO 030 050 22500
BHABA AUGUMENP H HPSEB HYDRO-HYDRO 450 1276 22500
BS CHAMBA HPSEB HYDRO-HYDRO 045 099 19500
GUMMA HPSEB HYDRO-HYDRO 300 423 22500
GAS TURBINE POWER STATION IPGCL THERMAL-GAS 27000 67233 39300
PPS-I PPCL THERMAL-GAS 33000 175905 38300
PPS-III PPCL THERMAL-GAS 137120 196879 36100
LOWER JHELUM JampKPDD HYDRO-HYDRO 10500 60214 5100
UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 2260 10514 6300
UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 10500 44202 8500
GANDHARBAL JampKPDD HYDRO-HYDRO 1500 8925 4700
KARNAH MPH JampKPDD HYDRO-HYDRO 200 1122 31000
CHENANI I JampKPDD HYDRO-HYDRO 2330 10892 6600
CHENANI II JampKPDD HYDRO-HYDRO 200 1188 9300
CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 750 3634 14200
IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 375 2108 18500
IGO MERCHELLONG JampKPDD HYDRO-HYDRO 300 1572 29700
PAHALGAM MHP JampKPDD HYDRO-HYDRO 450 1713 32900
MARPACHOO JampKPDD HYDRO-HYDRO 075 375 29800
HAFTAL JampKPDD HYDRO-HYDRO 100 483 28700
SANJAK JampKPDD HYDRO-HYDRO 126 441 36000
SEWA-III JampKPDD HYDRO-HYDRO 900 3273 20200
BHADERWAH JampKPDD HYDRO-HYDRO 150 935 8900
BAZGO JampKPDD HYDRO-HYDRO 030 108 33300
SUMOOR JampKPDD HYDRO-HYDRO 010 045 35400
HUNDER JampKPDD HYDRO-HYDRO 040 176 26200
STAKNA JampKPDD HYDRO-HYDRO 400 1933 4100
KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 124000 662879 31360
SURATGARH TPS RRVUNL THERMAL-COAL 150000 402328 41730
CHHABRA TPS 1amp 2 RRVUNL THERMAL-COAL 50000 305946 36700
CHHABRA TPS 3 RRVUNL THERMAL-COAL 25000 151536 36700
CHHABRA TPS 4 RRVUNL THERMAL-COAL 25000 155896 36700
RAMGARH GT POWER PROJECT RRVUNL THERMAL-COAL 22050 43177 41800
RAMGARH GAS T P PROJECT 3 RRVUNL THERMAL-GAS 5000 93615 41800
DHOLPUR C C POWER PROJECT RRVUNL THERMAL-R-LNG 33000 9486 46110
MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 14000 20855 34192
MINI MICRO HYDEL (MMH) P S RRVUNL HYDRO-HYDRO 2385 851 37800
KALISINDH TPP 1 RRVUNL THERMAL-COAL 60000 341543 45000
KALISINDH TPP 2 RRVUNL THERMAL-COAL 60000 211588 45000
KHARA HEP UPJVNL HYDRO-HYDRO 7200 26654 7200
MATATILLA HEP UPJVNL HYDRO-HYDRO 3060 12219 6500
OBRA HEP UPJVNL HYDRO-HYDRO 9900 21517 6300
RIHAND UPJVNL HYDRO-HYDRO 30000 57369 5500
ANPARA A TPS UPRVUNL THERMAL-COAL 63000 317536 27000
ANPARA B TPS UPRVUNL THERMAL-COAL 100000 705605 22700
ANPARA D UPRVUNL THERMAL-COAL 100000 300158 39800
HARDUAGANJ TPS UPRVUNL THERMAL-COAL 16500 45817 49200
HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 50000 304389 46600
OBRA A TPS UPRVUNL THERMAL-COAL 28800 13158 34000
OBRA B TPS UPRVUNL THERMAL-COAL 100000 328124 21900
Page 34
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) PANKI TPS UPRVUNL THERMAL-COAL 21000 66488 50300
PARICHHA TPS UPRVUNL THERMAL-COAL 22000 38762 49400
PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 42000 231931 45600
PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 50000 276722 50400
CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 24000 70845 8290
CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 14400 75366 8390
DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 3375 9595 12080
DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 5100 18701 10520
KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4140 17359 12330
KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 12000 33001 9420
KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 3000 11953 8320
TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 9000 33983 12460
MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 30400 124510 16110
RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 19800 17897 10550
MPUR UTTARAKHAND JVNL HYDRO-HYDRO 930 5121 19200
PATHRI UTTARAKHAND JVNL HYDRO-HYDRO 2040 11636 14200
GALOGI UTTARAKHAND JVNL HYDRO-HYDRO 300 648 12500
PRIVATE SECTOR
MGTPP CLP INDIA PVT LTD THERMAL-COAL 132000 268902 41940
SHRINAGAR HEP ALAKNANDA HPCL HYDRO-HYDRO 33000 127414 48800
GAMA INFRAPROP CCPP GAMA INFRAPROP PVT THERMAL-GAS 22500 52686 47000
PPGCL (BARA) JP POWER VENTURES LTD THERMAL-COAL 198000 448200 38500
MALANA HEP MALANA PCL HYDRO-HYDRO 8600 26354 29792
MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 10000 30369 32580
ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 19200 56347 36079
KASHANG HEP H P PCL HYDRO-HYDRO 19500 5034 29200
BASPA-II HEP HBPCL HYDRO-HYDRO 30000 132769 13600
KARCHAM WANGTOO HEP HBPCL HYDRO-HYDRO 100000 434386 36600
RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 108000 582600 43700
RITHALA COMBI CY POWER PLANT TATA POWER DDL THERMAL-GAS 9480 000 11900
RAJPURA TPS NABHA POWER LTD THERMAL-GAS 140000 901484 39000
TALWANDI SABO POWER LTD TALWANDI SABO POWER LTD THERMAL-COAL 198000 636040 49548
ROJA THERMAL POWER STATION ROJA POWER SCL THERMAL-COAL 120000 727200 43400
KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 34400 63400
BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 36000 62600
MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 38200 60800
UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 37900 61500
KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 42300 58800
LALITPUR PGCL BAJAJ ENERGY PVT LTD THERMAL-COAL 198000 359400 47300
PRAYAGRAJ PGCL PRAYAGRAJ PGCL THERMAL-COAL 132000 448200 38595
KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 132000 783182 33438
WESTERN REGION
CENTRAL SECTOR
INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 100000 325333 23892
OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 52000 141663 34001
GANDHAR CCPP NTPC LTD THERMAL-GAS 65739 221924 28700
KAWAS CCPP NTPC LTD THERMAL-GASN 65620 167929 27000
KORBA I amp II NTPC LTD THERMAL-COAL 210000 1499171 20500
KORBA III NTPC LTD THERMAL-COAL 50000 358746 26600
SIPAT STPS I NTPC LTD THERMAL-COAL 198000 1479902 26800
SIPAT STPS II NTPC LTD THERMAL-COAL 100000 766549 26500
VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 126000 693142 25800
VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 100000 608781 23800
VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 100000 673475 27600
VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 100000 655924 32900
VINDHYACHAL STPS V NTPC LTD THERMAL-COAL 50000 328265 31700
MOUDA I NTPC LTD THERMAL-COAL 100000 343130 44500
MOUDA Ii NTPC LTD THERMAL-COAL 66000 40637 39900
RATNAGIRI GAS amp POWER PVT LTD RGPPL THERMAL-GAS 196708 442485 47000
KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 000 24729
TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 32000 201227 10740
Page 35
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 365122 19069
TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 787444 29324
STATE SECTOR
GSEG-HAZIRA15610 MW GUJARAT S ENEGEN LTD THERMAL-GAS 15610 1805 28200
GSEG-HAZIRA35143 MW GUJARAT S ENEGEN LTD THERMAL-GAS 35130 22276 51300
GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 21978 51800
AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 13929 26100
KORBA TPS EAST CSPGCL THERMAL-COAL 44000 198673 33880
DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 365808 27570
KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 316500 30420
HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 532878 19410
CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 515 58300
MTTPS CHAMPA U-I CSPGCL THERMAL-COAL 50000 220376 39000
MTTPS CHAMPA U-II CSPGCL THERMAL-COAL 50000 23709 10000
SHP GANGREL CSPGCL HYDRO-HYDRO 1000 2350 36790
BANGO HEP CSPGCL HYDRO-HYDRO 12000 14662 8900
MHP KORBA WEST CSPGCL HYDRO-HYDRO 170 859 38190
SIKASAR HEP CSPGCL HYDRO-HYDRO 700 418 26870
DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8843 74500
DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 19446 51500
GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 66388 71600
GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127488 41300
KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 96072 43900
KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 29841 56400
SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 184966 58800
UKAI 1-5 GSECL THERMAL-COAL 85000 204891 46900
UKAI TPS 6 GSECL THERMAL-COAL 50000 284448 48200
WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 271999 58300
WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 82808 44100
KADANA HPS GSECL HYDRO-HYDRO 24200 34433 16800
UKAI HPS GSECL HYDRO-HYDRO 30500 40585 6100
TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 123000 11500
BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 8900 10900
BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 7200 27500
JHINNA HPS MPPGCL HYDRO-HYDRO 2000 9700 18500
RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 44300 3400
GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 17300 4600
SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 4100 16900
MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 14600 27000
PENCH HPS MPPGCL HYDRO-HYDRO 16000 23700 8100
RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 3000 16900
AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 134400 35100
SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 283800 38700
SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 344600 34300
SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 111600 61600
SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 211800 58000
SSTPS PH-I MPPGCL THERMAL-COAL 120000 233100 84300
BHUSAWAL TPS MSPGCL THERMAL-COAL 142000 566258 51100
CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1365682 33700
KHAPERKHEDA MSPGCL THERMAL-COAL 134000 706207 39100
KORADI TPS MSPGCL THERMAL-COAL 62000 443206 42000
NASIK TPS MSPGCL THERMAL-COAL 63000 297275 47000
PARLI TPS MSPGCL THERMAL-COAL 113000 175934 71600
PARAS MSPGCL THERMAL-COAL 50000 267931 38700
URAN CCPP MSPGCL THERMAL-GAS 67200 320330 30600
KOYANA MSPGCL HYDRO-HYDRO 195600 328155 13100
SMALL HYDRO POWER PLANTS MSPGCL HYDRO-HYDRO 45400 93062 30500
BHIRA MSPGCL HYDRO-HYDRO 8000 10046 8400
TILLARI MSPGCL HYDRO-HYDRO 8900 10584 3100
SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 233298 20500
SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 87633 20500
PRIVATE SECTOR
Page 36
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 81282 46750
JNSTPP(JAYPEE NIGRIE) JP POWER VENTURES LTD THERMAL-COAL 132000 726695 29310
MB POWER MB POWER THERMAL-COAL 120000 345632 38310
ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 754922 28671
ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 780761 23495
ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 198000 1263784 32090
ADANI POWER MAHARA ADANI POWER LTD THERMAL-COAL 330000 1666191 34124
AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 170065 36827
SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 252035 45129
ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 458551 36000
ESSAR POWER MP LTD ESSAR POWER MP LTD THERMAL-COAL 60000 243040 28600
VEDANTA LTD (P P -I) VEDANTA LTD THERMAL-GAS 3000 15044 24000
VEDANTA LTD (P P -II) VEDANTA LTD THERMAL-GAS 3000 21293 24000
PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 8234600 24000
165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 5850 64390
145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 68717 40349
SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 132655 28776
SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 144686 38567
MUNDRA UMPPCOASTAL GUJARAT POWER
LTD THERMAL-IMP COAL 400000 2530300
23900
LANCO AMARKANTAK TPP PATHADIH
U-ILANCO AMARKAN POWER LTD THERMAL-COAL 30000 195500
29200
LANCO AMARKANTAK TPP PATHADIH
U-IILANCO AMARKAN POWER LTD THERMAL-COAL 30000 206900
27600
BARADARHA TPS D B POWER LTD THERMAL-COAL 120000 677373 29200
JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 405000 28900
JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 453000 40500
DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 339437 40700
TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 293400 44000
TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 137200 37000
TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 174900 44000
BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 92900 14100
BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23700 34300
KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 27600 48300
CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2530300 23900
BHANDARDRA HEP -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 2475 54900
SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 161400 26500
SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 445000 39000
SOTHERN REGION
CENTRAL SECTOR
NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 325699 54820
NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 305532 39880
NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 998805 38510
NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 113016 54070
NEYVELI TAMILNADU POWER LTD JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 625274 42200
VALLUR TPS NTPC TECL THERMAL-COAL 150000 856438 42350
R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 1493 84300
RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1502919 29400
RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 341291 31800
SIMHADRI I NTPC LTD THERMAL-COAL 100000 688382 36800
SIMHADRI II NTPC LTD THERMAL-COAL 100000 663657 43400
KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 593110 31324
MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 291625 21764
KKNPP-1 amp 2 NPCIL NUCLEAR-NUCLEAR 200000 572609 40948
MINICOY LAKSHADEEP THERMAL-DIESEL 340 770 29600
KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1097 29600
AMINI LAKSHADEEP THERMAL-DIESEL 265 509 29600
ANDROTT LAKSHADEEP THERMAL-DIESEL 219 524 29600
KALPENI LAKSHADEEP THERMAL-DIESEL 175 356 29600
AGATTI LAKSHADEEP THERMAL-DIESEL 195 658 29600
KADMAT LAKSHADEEP THERMAL-DIESEL 190 414 29600
KILTAN LAKSHADEEP THERMAL-DIESEL 150 269 29600
CHETLET LAKSHADEEP THERMAL-DIESEL 100 139 29600
BITRA LAKSHADEEP THERMAL-DIESEL 043 024 29600
BANGARAM LAKSHADEEP THERMAL-DIESEL 018 009 29600
Page 37
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) STATE SECTOR
Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 721811 46500
Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 50000 336142 46500
RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 237358 46500
RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 239926 46500
RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 124500 46500
SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 62109 46500
UPPER SILERU APGENCO HYDRO-HYDRO 24000 33000 46500
LOWER SILERU APGENCO HYDRO-HYDRO 46000 81066 46500
DONKARAI APGENCO HYDRO-HYDRO 2500 6007 46500
PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 1262 46500
CHETTIPETA APGENCO HYDRO-HYDRO 100 214 46500
MUCHKUND APGENCO HYDRO-HYDRO 12000 37571 46500
NAGARJUNASAGAR RCPH APGENCO HYDRO-HYDRO 9000 606 46500
TUNGABHADRA HES amp HAMPI(AP
Share)
APGENCO HYDRO-HYDRO 7200 6100 46500
KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 352232 42600
KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 288131 32500
KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 319272 46500
RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 40073 44300
KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 308317 46000
KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 308963 51300
SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 61004 76600
NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 17960 75300
PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 20873 58300
POCHAMPAD-I TSPGENCO HYDRO-HYDRO 2700 5455 29800
POCHAMPAD-II TSPGENCO HYDRO-HYDRO 900 1932 40700
NIZAMSAGAR TSPGENCO HYDRO-HYDRO 1000 1126 53400
RAICHUR TPS 1 to 7 KPCL THERMAL-COAL 147000 890866 43800
RAICHUR TPS 8 KPCL THERMAL-COAL 25000 159523 48200
BELLARI TPS 1 KPCL THERMAL-COAL 50000 318679 51100
BELLARI TPS 2 KPCL THERMAL-COAL 50000 232347 55600
BELLARI TPS 3 KPCL THERMAL-COAL 70000 47565 34400
BHADRA PH KPCL HYDRO-HYDRO 3920 2369 45900
GERUSUPPA PH KPCL HYDRO-HYDRO 24000 26990 22000
GHAT PRABHA HEP KPCL HYDRO-HYDRO 3200 4777 25300
KADRA HPS KPCL HYDRO-HYDRO 15000 16889 26800
NAGJHARI KPCL HYDRO-HYDRO 90000 155159 9800
KODASALLI DPH KPCL HYDRO-HYDRO 12000 14854 19200
MUNIRA+MGH+SPH+SPH KPCL HYDRO-HYDRO 22640 48211 7900
SHARAVATHY HPS KPCL HYDRO-HYDRO 108550 276215 5400
ALMATTI DPH KPCL HYDRO-HYDRO 29000 39611 24600
VARAHI UGPH KPCL HYDRO-HYDRO 46000 71368 15600
IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 17196 15300
IDUKKI HPS KSEB HYDRO-HYDRO 78000 137905 15300
KAKKAD HPS KSEB HYDRO-HYDRO 5000 13063 15300
KALLADA HPS KSEB HYDRO-HYDRO 1500 4436 15300
KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 46544 15300
KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 635 15300
LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 30822 15300
MALANKARA HPS KSEB HYDRO-HYDRO 1050 2474 15300
MATTUPETTY KSEB HYDRO-HYDRO 200 230 15300
MALAMPUZHA KSEB HYDRO-HYDRO 250 063 15300
CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 864 15300
URUMI ST I amp II KSEB HYDRO-HYDRO 615 903 15300
LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 248 15300
NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7765 19625 15300
PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 16601 15300
PANNIAR HPS KSEB HYDRO-HYDRO 3240 6217 15300
PORINGALKUTHU KSEB HYDRO-HYDRO 3600 10052 15300
PORINGALKUTHU LBE KSEB HYDRO-HYDRO 1600 9438 15300
PEPPARA KSEB HYDRO-HYDRO 300 395 15300
POOZHITHODE KSEB HYDRO-HYDRO 480 1045 15300
Page 38
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) PEECHI KSEB HYDRO-HYDRO 125 040 15300
RANI-PERUNADU KSEB HYDRO-HYDRO 400 585 15300
SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 79783 15300
SENGULAM HPS KSEB HYDRO-HYDRO 5120 11558 15300
SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 16711 15300
VILANGAD KSEB HYDRO-HYDRO 750 1578 15300
BARAPOLE KSEB HYDRO-HYDRO 1500 1932 15300
VELLATHOOVAL KSEB HYDRO-HYDRO 360 305 15300
CHIM0NY KSEB HYDRO-HYDRO 250 156 15300
ADYANPARA KSEB HYDRO-HYDRO 350 501 15300
BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 554 15300
KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 3801 15300
KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 23132 32800
ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 14416 62280
METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 523970 62280
METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 321270 62280
NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 336575 62280
NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 591240 62280
TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 508966 62280
KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 30897 62280
VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 18720 90699 62280
KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 33593 62280
BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 1047 62280
PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 1250 62280
PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 330 62280
MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 4897 62280
MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 032 62280
KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15681 62280
KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 40608 62280
KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 21342 62280
KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 4717 62280
KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4322 62280
KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2399 62280
METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 4416 62280
METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 8035 62280
BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2187 62280
BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2359 62280
BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2511 62280
BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 1949 62280
BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 1819 62280
POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 172 62280
SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 241 62280
MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 026 62280
THIRUMOORTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 136 62280
PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 9309 62280
VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 353 62280
SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 4192 62280
PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 6571 62280
SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 1186 62280
SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6319 62280
ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 6122 62280
KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 28674 62280
SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 18381 62280
SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 4258 62280
KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 12680 62280
KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4201 62280
ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 000 62280
PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 19175 62280
AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 078 62280
BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 504 62280
BHAVANI KATTALAI (BKB)(IIIampIII BB I amp II)TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 5847 62280
PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 000 62280
Page 39
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) SRI DAMODARAM STPS APPDCL THERMAL-COAL 160000 808108 36300
PRIVATE SECTOR
KARUPPUR TANJORE LANCO TANJORE PCL THERMAL-GAS 12000 48096 28770
SIMHAPURI ENERGY LTD SIMHAPURI ENERGY LTD THERMAL-COAL 60000 143900 39100
JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 7111 45500
SBU 1 JSW ENERGY LTD
VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 26000 159100
43300
SBU 2 JSW ENERGY LTD
VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 60000 247900
42800
LANCO KPLLANCO KONDAPALLI POWER
LTDTHERMAL-GAS 36814 85060
25776
LANCO KPL STG -IILANCO KONDAPALLI POWER
LTDTHERMAL-GAS 36600 12979
46330
LANCO KPL STG -IIIALANCO KONDAPALLI POWER
LTDTHERMAL-GAS 37100 85710
46330
LANCO KPL STG -III BLANCO KONDAPALLI POWER
LTDTHERMAL-GAS 37100 43639
46330
HINDUJA NATIONAL PCL HINDUJA NATIONAL PCL THERMAL-COAL 104000 303000 38200
MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 121164 49940
UDUPI POWER COR LTD ADANI POWER LTD THERMAL-COAL 120000 754613 42500
SPECTRUM POWER GENERATION
LTD SPECTRUM PG LTD THERMAL-GASN 20525 9256812
34952
TAQA NEYVELI POWER COM PVT
LTD TAQA NEYVELI THERMAL-LIG 25000 5840
34500
ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 251000 51000
ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 207860 36800
GMR VEMAGIRI POWER GENERATION
LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 30117
46450
EASTERN REGION
CENTRAL SECTOR
MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 64675 53113
MTPS STAGE - II KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 39000 1432 69138
BOKARO `B` TPS DVC THERMAL-COAL 63000 145670 31539
MEJIA TPS U 1-3 DVC THERMAL-COAL 63000 348298 31552
MEJIA TPS U 4 DVC THERMAL-COAL 21000 116099 34997
MEJIA TPS U 5-6 DVC THERMAL-COAL 50000 276427 35976
MEJIA TPS U 7-8 DVC THERMAL-COAL 100000 552854 36991
DURGAPUR STEEL TPS DVC THERMAL-COAL 100000 665550 39323
DURGAPUR TPS DVC THERMAL-COAL 21000 59270 35416
RAGHUNATHPUR TPS DVC THERMAL-COAL 120000 201650 35326
MAITHON HYDEL STA DVC HYDRO-HYDRO 6320 12200 17984
CHANDRAPURA TPSU1-3 DVC THERMAL-COAL 42000 257610 35095
CHANDRAPURA TPSU7-8 DVC THERMAL-COAL 50000 306673 34987
KODERMA TPS DVC THERMAL-COAL 100000 380180 38131
PANCHET HPS DVC HYDRO-HYDRO 8000 13360 17984
TILLAYA HPS DVC HYDRO-HYDRO 400 1410 17984
RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34700 35400
TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 277300 23200
TLDP -III NHPC LTD HYDRO-HYDRO 13200 55400 62000
TLDP -IV NHPC LTD HYDRO-HYDRO 16000 60300 25600
FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 957219 33700
FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 308943 41000
BONGAINGAON TPS NTPC LTD THERMAL-COAL 25000 153663 58600
KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 542277 34200
KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 942591 34200
BARH-II NTPC LTD THERMAL-COAL 132000 728021 44500
TALCHER TPS NTPC LTD THERMAL-COAL 46000 335521 30100
TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 702319 25600
TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1436521 24700
STATE SECTOR
BTPS(RampM) BIHAR STATE PGCL THERMAL-COAL 22000 12142 39700
BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 98331 10602
HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 50593 9482
CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 19689 2605
RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 53192 6033
UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 147208 14637
Page 40
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 60353 4519
IB TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 288567 25000
J P H GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 210 038 61100
MEYONG CHU GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 400 1086 61100
TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 122667 38200
DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 214339 43321
KOLAGHAT THERMAL POWER
STATION
WEST BENGAL PDCL THERMAL-COAL 126000 538269 31603
BAKRESHWAR THERMAL POWER
PLANT
WEST BENGAL PDCL THERMAL-COAL 105000 634876 32154
BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 45000 166855 33299
SANTHALDIH THERMAL POWER
STATION
WEST BENGAL PDCL THERMAL-COAL 50000 336442 34932
SAGARDIGHI THERMAL POWER
PROJECT
WEST BENGAL PDCL THERMAL-COAL 160000 423121 34705
JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 20344 68900
RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 24559 68900
TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 4623 68900
PURULIA PUMPED STORAGE
PROJECT
WEST BENGAL SEDCL HYDRO-HYDRO 90000 108816 68900
MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2768 68900
PRIVATE SECTOR
CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 49474 20230
CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 555500 70200
HALDIA ENERGY HALDIA ENERGY LTD THERMAL-COAL 60000 371000 50400
DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3688 63400
KAMALANGA TPS GMR KAMALANGA ENERGY LTD THERMAL-COAL 105000547670
33300
ADHUNIK POWER U-1 ADHUNIK POWER THERMAL-COAL 27000 158 44060
ADHUNIK POWER U-2 ADHUNIK POWER THERMAL-COAL 27000 168 44250
VL-JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 332800 23622
JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 43000 45250
JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 71700 37030
JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 70700 35920
JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 71100 38870
JOJOBERA UNIT 5 TATA POWER COM LTD THERMAL-COAL 12000 79300 44560
JOJOBERA UNIT 6 TATA POWER COM LTD THERMAL-WHR 12000 83700 12840
IEL KALINGANAGAR U-I TATA POWER COM LTD THERMAL-WG 6750 33400 22500
IEL KALINGANAGAR U-II TATA POWER COM LTD THERMAL-WG 6750 34800 22500
MAITHON UNIT 1 amp 2 TATA POWER COM LTD THERMAL-COAL 105000 678000 36100
HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 27500 24340
HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 28400 24340
HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 15800 24310
NORTH EASTERN REGION
CENTRAL SECTOR
LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 74100 36600
AGARTALA GT NEEPCO THERMAL-GAS 13500 88611 27210
ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 153111 32310
DOYANG HEP NEEPCO HYDRO-HYDRO 7500 25598 49801
KOPILI HEP NEEPCO HYDRO-HYDRO 20000 98186 11491
KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 19582 20237
KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 10310 17968
RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 124093 22945
TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 10100 17344 39000
STATE SECTOR
HYDRO POWER (122 Stns) ITANAGAR GOVT OF ARUNACHAL
PRADESHHYDRO-HYDRO 6971 6217270
24600
KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39514 17337
LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 82327 36810
NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 33318 48290
MYNTRIANG SHEP ST II ASSAM POWER GENCO HYDRO-HYDRO 300 567 35776
LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 9130 49200
LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 012 49200
DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 022 49200
TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 000 49200
UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 4990 16000
UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 6476 37000
UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 16494 14600
UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 3600 9556 15000
SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 758 8000
MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44070 44800
KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 154 41400
TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 091 41400
MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 411 41400
MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 394 41400
KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 760 41400
SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 3264 41400
LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 044 41400
BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 18953 28000
ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 43585 28200
GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 4080 11100
Note
LIG Lignite N Naptha WHR Waste Heat Recovery
Page 41
2012-13 2013-14 2014-15 2015-16 2016-17 2017-18
TampD Losses 2304 2284 2277 2181 2142 2104
ATampC Losses 2548 2262 2572 2398 NA NA
Provisional
Note As per PFC for utilities selling directly to consumers NA- Not Available
Total Number of Villages
597464
Note From the year 2004-05 onwards Definition of Village Electrification-
A village would be declared Electrified if
Without
Subsidy
Gap ACS-
ARR(
Without
Subsidy)
Paiseunit
Gap ACS-
ARR (on
subsidy
booked
basis)
paiseunit
Gap ACS-
ARR (on
subsidyrece
ived basis)
paiseunit
2013-14 400 118 76 77
2014-15 412 108 58 60
Source- PFC Reports on the performance of State Power Utilities
2013-14 4894
2014-15 5304
2015-16 5459
2016-17 5743
2017-18 6080
2018-19 6289
11
11 T amp D and ATampC Losses ()
12 All India Village Electrification
Villiages Electrified (Nos)
10000All villages as per census 2011 has
been electrified on 28042018
Villages electrified
Average cost of supply(ACS)
(paiseunit)
i) Basic Infrastructure such as Distribution Transformer and Distribution lines are provided in the inhabited locality
as well as Dalit Basti hemlet where it exists (For electrification through Non-Conventional Energy Sources a
Distribution Transformer may not be necessary)
14 All India Coal consumption for Power Generation (MT)
520
Average Revenue Realization(paiseunit)
518
Year
ii) Electricity is provided to Public places like Schools Panchayat Office Health Centre Dispensaries Community
Centres etc and
iv) Mandatory Certification from Gram Panchayat regarding the completion of village electrification should be
obtained
13 Average cost of Power amp Average Realisation
iii) The number of households electrified should be at least 10 of the total number of households in the village
SN Contents Page
1 Capacity Addition Targets and Achievements in 12th Plan amp upto March2019 12
2 Capacity Addition Targets amp Achievements during Apr-2019 and Apr-19 to Apr-19 13
3 Installed Capacity in various Regions including their shares 14-19
Section B - Capacity Addition
(i) CAPACITY ADDTION TARGETS AND ACHIEVEMENTS IN THE 12TH PLAN Figures in MW
TARGET ACH TARGET ACH TARGET ACH TARGET ACH
CENTRAL 14878 15869 6004 2584 5300 2000 26182 20453
STATE 13922 22201 1608 2276 0 0 15530 24477
PRIVATE 43540 53661 3285 619 0 0 46825 54280
ALL INDIA 72340 91730 10897 5479 5300 2000 88537 99209
(ii) CAPACITY ADDITION TARGET AND ACHIEVEMENT FOR 2017-18 (IN MW)
THERMAL HYDRO NUCLEAR
TARGET ACH TARGET ACH TARGET ACH TARGET ACH
CENTRAL 4880 3170 800 390 500 6180 3560
STATE 3546 1760 300 200 0 3846 1960
PRIVATE 2940 3780 205 205 0 3145 3985
ALL INDIA 11366 8710 1305 795 500 0 13171 9505
(iii) CAPACITY ADDITION ACHIEVEMENT FOR 2018-19 (IN MW)
TARGET ACH TARGET ACH TARGET ACH TARGET ACH
CENTRAL 2760 1960 710 110 0 0 3470 2070
STATE 4506 2850 130 30 0 0 4636 2880
PRIVATE 0 972 0 0 0 0 0 972
ALL INDIA 7266 5782 840 140 0 0 8106 5922
12
SECTOR
SECTOR
TOTAL
TOTALNUCLEARHYDROTHERMAL
1 Capacity Addtion Targets and Achievements in the 12th Plan amp upto March2019
SECTORTHERMAL HYDRO NUCLEAR TOTAL
(MW)
Cummulative
Deviation
Target Achievement Target Achievement (+) (-)
Central 6040 500 0 500 0 -500
State 425615 660 0 660 0 -660
Private 0 0 0 0 0 0
Total 1029615 1160 0 1160 0 -1160
Central 600 0 0 0 0 0
State 21099 0 0 0 0 0
Private 379 0 0 0 0 0
Total 118999 0 0 0 0 0
Nuclear Central 700 0 0 0 0 0
Central 7340 500 0 500 0 -500
State 446714 660 0 660 0 -660
Private 379 0 0 0 0 0
Total 1218614 1160 0 1160 0 -1160
Electricity Generation (MU) Targets and Achievements for 2016-17
13
Hydro
All India
Capacity Addition TargetsAchievements during the Month of Apr-2019
Thermal
2 Capacity Addition Targets Achievements During Apr-2019
Schemes Sector
Target 2019-20
Apr-19 to Apr-19Apr-19
11
60
0 0
11
60
0 0 0 0
0
200
400
600
800
1000
1200
1400
Thermal Hydro Nuclear Total
MW
Targets and Achievement during 2019-20Target Achievement
0
200
400
600
800
1000
1200
Thermal Hydro Nuclear Total
1160
0 0
1160
0 0 00
MW
Target Achievement
Coal Lignite Gas Diesel Total
State 1634400 25000 287920 000 1947320 000 869755 69956 2887031
Private 2168083 108000 55800 000 2331883 000 251400 1312046 3895329
Central 1233537 25000 234406 000 1492943 162000 849622 37900 2542465
Sub Total 5036020 158000 578126 000 5772146 162000 1970777 1419902 9324825
State 2156000 104000 284982 000 2544982 000 544650 54789 3144421
Private 3474567 50000 467600 000 3992167 000 48100 2186476 6226743
Central 1650295 000 328067 000 1978362 184000 162000 66630 2390992
Sub Total 7280862 154000 1080649 000 8515511 184000 754750 2307894 11762155
State 1993250 000 79198 28788 2101236 000 1177483 58688 3337407
Private 1187450 25000 532210 27370 1772030 000 000 3749140 5521170
Central 1123502 289000 35958 000 1448460 332000 000 54190 1834650
Sub Total 4304202 314000 647366 56158 5321726 332000 1177483 3862018 10693227
State 624000 000 10000 000 634000 000 353792 27511 1015303
Private 638700 000 000 000 638700 000 39900 111637 790237
Central 1483664 000 000 000 1483664 000 100520 1000 1585184
Sub Total 2746364 000 10000 000 2756364 000 494212 140148 3390724
State 000 000 49771 3600 53371 000 42200 23325 118895
Private 000 000 2450 000 2450 000 000 6104 8554
Central 77002 000 125360 000 202362 000 100500 3000 305862
Sub Total 77002 000 177581 3600 258183 000 142700 32429 433311
State 000 000 000 4005 4005 000 000 525 4530
Private 000 000 000 000 000 000 000 738 738
Central 000 000 000 000 000 000 000 510 510
Sub Total 000 000 000 4005 4005 000 000 1773 5778
State 6407650 129000 711871 36393 7284913 000 2987880 234793 10507586
Private 7468800 183000 1058060 27370 8737230 000 339400 7366140 16442770
Central 5568000 314000 723791 000 6605791 678000 1212642 163230 8659663
Total 19444450 626000 2493722 63763 22627934 678000 4539922 7764163 35610019
Figures at decimal may not tally due to rounding off
Note -
(As per latest information available with MNRE)
Break up of RES all India as on 31032019 is given below (in MW)
459315 3562597 2818071 7764163
A 0 MW
B Apr 2019 0 MW
C
Apr 2019 0 MW
D Net Capacity Added during Apr 2019 A-B-C 0 MW
Sector wise breakup of RES capacity as shown is provisional
Share of installed capacity of BBMB Stations is included in state sector of partner states
BM PowerCogen Waste to Energy
910350 13830
Capacity Added during Apr 2019
Capacity Retired during
Capacity removed due to change
from Conventional to RES during
Islands
ALL INDIA
Abbreviation- SHP=Small Hydro Project (le 25 MW) BP=Biomass Power UampI=Urban amp Industrial Waste Power RES=Renewable Energy Sources
1 RES include SHP BP UampI Solar and Wind Energy Installed capacity in respect of RES (MNRE) as on 31032019
Small
Hydro PowerWind Power
Bio-PowerSolar Power
Total
Capacity
RES
(MNRE)
Northern Region
Western Region
Southern Region
Eastern Region
North Eastern
Region
ALL INDIA INSTALLED CAPACITY (IN MW) OF POWER STATIONS
(As on 30042019)
(UTILITIES)
Region Ownership Sector
Mode wise breakup
Grand TotalThermalNuclear Hydro
Coal Lignite Gas Diesel Total
State 13500 000 180040 000 193540 000 000 000 193540
Private 86922 000 10800 000 97722 000 000 17889 115611
Central 311272 000 20701 000 331973 10283 72309 000 414565
Sub-Total 411694 000 211541 000 623235 10283 72309 17889 723716
State 272000 000 15000 000 287000 000 110282 6930 404212
Private 408078 000 000 000 408078 000 20000 34512 462590
Central 129472 000 53561 000 183034 10094 66370181 500 259998
Sub-Total 809550 000 68561 000 878112 10094 196652 41942 1126799
State 000 000 000 000 000 000 69460 25661 95121
Private 000 000 000 000 000 000 99200 62668 161868
Central 18340 000 6201 000 24541 2895 122388 000 149824
Sub-Total 18340 000 6201 000 24541 2895 291048 88329 406813
State 000 000 17500 000 17500 000 123000 12903 153403
Private 000 000 000 000 000 000 000 6483 6483
Central 50639 000 12907 000 63547 6798 109188 000 179533
Sub-Total 50639 000 30407 000 81047 6798 232188 19386 339419
State 176000 000 15000 000 191000 000 259770 12780 463550
Private 511550 000 000 000 511550 000 28800 115462 655812
Central 85458 000 26401 000 111859 19681 92342 000 223882
Sub-Total 773008 000 41401 000 814409 19681 380912 128242 1343244
State 626000 25000 60380 000 711380 000 109618 2385 823383
Private 280200 108000 000 000 388200 000 10400 730181 1128781
Central 95625 25000 22110 000 142735 55674 73901 34400 306710
Sub-Total 1001825 158000 82490 000 1242315 55674 193919 766966 2258874
State 546900 000 000 000 546900 000 72410 2510 621820
Private 871433 000 000 000 871433 000 84200 288760 1244393
Central 379639 000 54949 000 434588 28948 180253 3000 646789
Sub-Total 1797972 000 54949 000 1852921 28948 336863 294270 2513002
State 000 000 000 000 000 000 125215 6787 132002
Private 9900 000 45000 000 54900 000 8800 52620 116320
Central 34324 000 6966 000 41290 3124 47554 000 91968
Sub-Total 44224 000 51966 000 96190 3124 181569 59407 340290
State 000 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 000 3471 3471
Central 3815 000 1503 000 5317 801 10171 000 16289
Sub-Total 3815 000 1503 000 5317 801 10171 3471 19760
124953 000 29105 000 154058 23703 75145 000 252907
State 1634400 25000 287920 000 1947320 000 869755 69956 2887031
Private 2168083 108000 55800 000 2331883 000 251400 1312046 3895329
Central 1233537 25000 234406 000 1492943 162000 849622 37900 2542465
Grand Total 5036020 158000 578126 000 5772146 162000 1970777 1419902 9324825
Delhi
Haryana
Himachal Pradesh
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
NORTHERN REGION
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
(As on 30042019)
State Ownership Sector
Mode wise breakup
Grand TotalThermalNuclear Hydro
RES
(MNRE)
Jammu amp Kashmir
Punjab
Rajasthan
Uttar Pradesh
Uttarakhand
Chandigarh
Central - Unallocated
Total (Northern
Region)
(As on 30042019)
Coal Lignite Gas Diesel Total
State 000 000 000 000 000 000 000 005 005
Private 000 000 4800 000 4800 000 000 392 5192
Central 46959 000 1967 000 48926 2600 000 000 51526
Sub-Total 46959 000 6767 000 53726 2600 000 397 56723
State 000 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 000 1447 1447
Central 14141 000 4334 000 18475 700 000 000 19175
Sub-Total 14141 000 4334 000 18475 700 000 1447 20622
State 371000 104000 217782 000 692782 000 77200 6470 776452
Private 726567 50000 396000 000 1172567 000 000 833180 2005747
Central 324243 000 42400 000 366643 55900 000 24330 446873
Sub-Total 1421810 154000 656182 000 2231992 55900 77200 863980 3229072
State 540000 000 000 000 540000 000 170366 8396 718762
Private 617400 000 10000 000 627400 000 000 418040 1045440
Central 334238 000 25700 000 359938 27300 152000 30000 569238
Sub-Total 1491638 000 35700 000 1527338 27300 322366 456436 2333440
State 228000 000 000 000 228000 000 12000 1105 241105
Private 885000 000 000 000 885000 000 000 52430 937430
Central 211075 000 000 000 211075 4800 10000 000 225875
Sub-Total 1324075 000 000 000 1324075 4800 22000 53535 1404410
State 1017000 000 67200 000 1084200 000 285084 38813 1408097
Private 1245600 000 56800 000 1302400 000 48100 880441 2230941
Central 466780 000 227273 000 694053 69000 000 12300 775353
Sub-Total 2729380 000 351273 000 3080653 69000 333184 931553 4414390
State 000 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 000 546 546
Central 19560 000 6634 000 26194 900 000 000 27094
Sub-Total 19560 000 6634 000 26194 900 000 546 27640
233300 000 19759 000 253059 22800 000 000 275859
State 2156000 104000 284982 000 2544982 000 544650 54789 3144421
Private 3474567 50000 467600 000 3992167 000 48100 2186476 6226743
Central 1650295 000 328067 000 1978362 184000 162000 66630 2390992
Grand Total 7280862 154000 1080649 000 8515511 184000 754750 2307894 11762155
Goa
Daman amp Diu
Gujarat
Madhya Pradesh
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
WESTERN REGION
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
ThermalNuclear Hydro
RES
(MNRE)
State Ownership Sector
Mode wise breakup
Grand Total
Chhattisgarh
Maharashtra
Dadra amp Nagar
Naveli
Central - Unallocated
Total (Western
Region)
(As on 30042019)
Coal Lignite Gas Diesel Total
State 501000 000 23540 000 524540 000 167360 5618 697518
Private 387388 000 381318 3680 772386 000 000 743342 1515728
Central 154683 12773 000 000 167456 12727 000 25000 205183
Sub-Total 1043071 12773 404858 3680 1464382 12727 167360 773960 2418429
State 558250 000 000 000 558250 000 247993 4122 810365
Private 83945 000 83182 000 167127 000 000 393644 560771
Central 180685 14927 000 000 195612 14873 000 1000 211485
Sub-Total 822880 14927 83182 000 920989 14873 247993 398766 1582621
State 502000 000 000 12792 514792 000 358660 19389 892841
Private 195850 000 000 2520 198370 000 000 1363591 1561961
Central 242780 40140 000 000 282920 69800 000 000 352720
Sub-Total 940630 40140 000 15312 996082 69800 358660 1382979 2807521
State 000 000 000 15996 15996 000 185650 17290 218936
Private 61500 000 17400 000 78900 000 000 19021 97921
Central 86142 28180 35958 000 150280 36200 000 5000 191480
Sub-Total 147642 28180 53358 15996 245176 36200 185650 41311 508337
State 432000 000 52408 000 484408 000 217820 12270 714498
Private 458767 25000 50310 21170 555247 000 000 1229228 1784475
Central 302532 136420 000 000 438952 144800 000 23190 606942
Sub-Total 1193299 161420 102718 21170 1478607 144800 217820 1264688 3105915
State 000 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 000 000 000
Central 000 10000 000 000 10000 000 000 000 10000
Sub-Total 000 10000 000 000 10000 000 000 000 10000
State 000 000 3250 000 3250 000 000 000 3250
Private 000 000 000 000 000 000 000 314 314
Central 14080 10760 000 000 24840 8600 000 000 33440
Sub-Total 14080 10760 3250 000 28090 8600 000 314 37004
142600 35800 000 000 178400 45000 000 000 223400
State 1993250 000 79198 28788 2101236 000 1177483 58688 3337407
Private 1187450 25000 532210 27370 1772030 000 000 3749140 5521170
Central 1123502 289000 35958 000 1448460 332000 000 54190 1834650
Grand Total 4304202 314000 647366 56158 5321726 332000 1177483 3862018 10693227
Kerala
Andhra Pradesh
Telangana
Karnataka
Total (Southern
Region)
Tamil Nadu
NLC
Puducherry
Central - Unallocated
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
SOUTHERN REGION
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
State Ownership Sector
Mode wise breakup
Grand TotalThermalNuclear Hydro
RES
(MNRE)
(As on 30042019)
Coal Lignite Gas Diesel Total
State 000 000 000 000 000 000 000 7070 7070
Private 28100 000 000 000 28100 000 000 25545 53645
Central 384933 000 000 000 384933 000 11000 000 395932
Sub-Total 413033 000 000 000 413033 000 11000 32615 456647
State 42000 000 000 000 42000 000 13000 405 55405
Private 73000 000 000 000 73000 000 000 3495 76495
Central 39374 000 000 000 39374 000 6100 000 45474
Sub-Total 154374 000 000 000 154374 000 19100 3900 177374
State 540000 000 10000 000 550000 000 98600 12195 660795
Private 243700 000 000 000 243700 000 000 35250 278950
Central 76077 000 000 000 76077 000 41000 000 117077
Sub-Total 859777 000 10000 000 869777 000 139600 47445 1056822
State 000 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 000 000 000
Central 698504 000 000 000 698504 000 18620 000 717124
Sub-Total 698504 000 000 000 698504 000 18620 000 717124
State 42000 000 000 000 42000 000 206192 2630 250822
Private 293900 000 000 000 293900 000 000 47346 341246
Central 163390 000 000 000 163390 000 8900 1000 173290
Sub-Total 499290 000 000 000 499290 000 215092 50976 765358
State 000 000 000 000 000 000 36000 5211 41211
Private 000 000 000 000 000 000 39900 001 39901
Central 8703 000 000 000 8703 000 6400 000 15103
Sub-Total 8703 000 000 000 8703 000 82300 5212 96215
112683 000 000 000 112683 000 8501 000 121184
State 624000 000 10000 000 634000 000 353792 27511 1015303
Private 638700 000 000 000 638700 000 39900 111637 790237
Central 1483664 000 000 000 1483664 000 100520 1000 1585184
Grand Total 2746364 000 10000 000 2756364 000 494212 140148 3390724
Total (Eastern
Region)
Bihar
Jharkhand
West Bengal
DVC
Odisha
Sikkim
Central - Unallocated
HydroOwnership Sector
Mode wise breakup
Grand TotalThermalNuclear
RES
(MNRE)
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
State
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
EASTERN REGION
(As on 30042019)
Coal Lignite Gas Diesel Total
State 000 000 32821 000 32821 000 10000 501 43322
Private 000 000 2450 000 2450 000 000 2650 5100
Central 40852 000 43556 000 84408 000 35708 2500 122616
Sub-Total 40852 000 78827 000 119679 000 45708 5651 171038
State 000 000 000 000 000 000 000 10711 10711
Private 000 000 000 000 000 000 000 2939 2939
Central 3705 000 4682 000 8387 000 11655 000 20042
Sub-Total 3705 000 4682 000 8387 000 11655 13650 33692
State 000 000 000 000 000 000 32200 3253 35453
Private 000 000 000 000 000 000 000 012 012
Central 4560 000 10969 000 15529 000 7227 000 22756
Sub-Total 4560 000 10969 000 15529 000 39427 3265 58221
State 000 000 16950 000 16950 000 000 1601 18551
Private 000 000 000 000 000 000 000 009 009
Central 5610 000 43695 000 49305 000 6849 500 56654
Sub-Total 5610 000 60645 000 66255 000 6849 2110 75214
State 000 000 000 3600 3600 000 000 545 4145
Private 000 000 000 000 000 000 000 344 344
Central 4710 000 7157 000 11867 000 9534 000 21401
Sub-Total 4710 000 7157 3600 15467 000 9534 889 25890
State 000 000 000 000 000 000 000 3067 3067
Private 000 000 000 000 000 000 000 100 100
Central 3210 000 4893 000 8103 000 5733 000 13836
Sub-Total 3210 000 4893 000 8103 000 5733 3167 17003
State 000 000 000 000 000 000 000 3647 3647
Private 000 000 000 000 000 000 000 050 050
Central 3105 000 4046 000 7151 000 9794 000 16945
Sub-Total 3105 000 4046 000 7151 000 9794 3697 20642
11250 000 6362 000 17612 000 14000 000 31612
State 000 000 49771 3600 53371 000 42200 23325 118895
Private 000 000 2450 000 2450 000 000 6104 8554
Central 77002 000 125360 000 202362 000 100500 3000 305862
Grand Total 77002 000 177581 3600 258183 000 142700 32429 433311
Assam
Arunachal Pradesh
Meghalaya
Tripura
Manipur
Nagaland
Mizoram
Central - Unallocated
Total (North-
Eastern Region)
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
NORTH-EASTERN REGION
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
State Ownership Sector
Mode wise breakup
Grand TotalThermalNuclear Hydro
RES
(MNRE)
(As on 30042019)
Coal Lignite Gas Diesel Total
State 000 000 000 4005 4005 000 000 525 4530
Private 000 000 000 000 000 000 000 663 663
Central 000 000 000 000 000 000 000 510 510
Sub-Total 000 000 000 4005 4005 000 000 1698 5703
State 000 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 000 075 075
Central 000 000 000 000 000 000 000 000 000
Sub-Total 000 000 000 000 000 000 000 075 075
State 000 000 000 4005 4005 000 000 525 4530
Private 000 000 000 000 000 000 000 738 738
Central 000 000 000 000 000 000 000 510 510
Grand Total 000 000 000 4005 4005 000 000 1773 5778
Andaman amp
Nicobar
Lakshadweep
Total (Islands)
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
ISLANDS
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
State Ownership Sector
Mode wise breakup
Grand TotalThermalNuclear Hydro
RES
(MNRE)
SrNo Contents Page
1 Executive summary of Target and Achievement of Transmission Lines during 2019-20
20(1)
2 List of Transmission Lines CommissionedReady for commissioning during Apr-2019 20(2)
Section C - Transmission Lines
1 Executive summary of Target and Achievement of Transmission Lines during 2019-20 As on 30-04-19
(All figures in circuit kms)
Ce
ntr
al S
ecto
r
Sta
te S
ecto
r
JV
Pri
va
te S
ecto
r
To
tal
Ce
ntr
al S
ecto
r
Sta
te S
ecto
r
JV
Pri
va
te S
ecto
r
To
tal
Ce
ntr
al S
ecto
r
Sta
te S
ecto
r
JV
Pri
va
te S
ecto
r
To
tal
Ce
ntr
al S
ecto
r
Sta
te S
ecto
r
JV
Pri
va
te S
ecto
r
To
tal
Ce
ntr
al S
ecto
r
Sta
te S
ecto
r
JV
Pri
va
te S
ecto
r
To
tal
Ce
ntr
al
Se
cto
r
Sta
te S
ec
tor
JV
Pri
va
te S
ec
tor
Gra
nd
To
tal
0 0 0 0 0 0 0 0 2727 958 2334 6019 2239 3416 1143 6798 781 10023 0 10804 5747 14397 3477 23621
Apr19 Programme 0 0 0 0 0 0 0 0 577 416 557 1550 60 890 203 1153 0 309 0 309 637 1615 760 3012
Achievement 0 0 0 0 0 0 0 0 53 0 0 53 0 20 0 20 0 401 0 401 53 421 0 474
Upto Apr-19 Programme 0 0 0 0 0 0 0 0 577 416 557 1550 60 890 203 1153 0 309 0 309 637 1615 760 3012
Achievement 0 0 0 0 0 0 0 0 53 0 0 53 0 20 0 20 0 401 0 401 53 421 0 474
20(1)
220 kV Grand Total 800 kV 500 kV
Programme 2019-20
Programme
Achievement
HVDC765 kV 400 kV
Line
1 2 3 4 5 6
1 400 Bhadla (PG) - Bhadla (RVPN) line DC PGCIL 53
53
2 400 LILO of one ckt Jhanor - Navsari at Vav Ss DC GETCO 20
3 220 Banda-Chitrakoot Line DC UPPTCL 226
4 220 Gorakhpur (PG)-Gola line DC UPPTCL 82
5 220 Hapur(765) - Faridnagar line SC UPPTCL 11
6 220 Kalikiri - Madanapalli line DC APTRANSCO 60
7 220LILO of Gr Noida -Noida Sec-129 at Noida
Sec-148DC UPPTCL 1
8 220LILO of one Ckt of Badshahpur Pali at Sec-
65 GurgaonDC HVPNL 3
9 220 Sultanpur-Sangipur LILO Section at Amethi DC UPPTCL 18
421
0
474
20(2)
Grand Total
2Transmission Lines (220 kV and above) CommissionedReady for commissioning During Apr-2019
Voltage
Level (kV)Name of Transmission Lines
Circuit
Type
Executing
Agency
CENTRAL SECTOR
Total of CENTRAL SECTOR
STATE SECTOR Sector
Total of STATE SECTOR
PRIVATE SECTOR
Total of PRIVATE SECTOR
SlNo
Length(CKm)
As on 30-04-19
SN Contents Page
1 Executive summary of Target and Achievement of Substations during 2019-20 21(1)
2Sub Stations (220 kV and above) commissionedready for commisssioning during Apr-
201921(2)
Section D - Sub Stations
1 Executive summary of Target and Achievement of Substations during 2019-2020 As on 30-04-19
(All figures in circuit MVA)
Ce
ntr
al S
ecto
r
Sta
te S
ecto
r
JV
Pri
va
te S
ecto
r
To
tal
Ce
ntr
al S
ecto
r
Sta
te S
ecto
r
JV
Pri
va
te S
ecto
r
To
tal
Ce
ntr
al S
ecto
r
Sta
te S
ecto
r
JV
Pri
va
te S
ecto
r
To
tal
Ce
ntr
al S
ecto
r
Sta
te S
ecto
r
JV
Pri
va
te S
ecto
r
To
tal
Ce
ntr
al S
ecto
r
Sta
te S
ecto
r
JV
Pri
va
te S
ecto
r
To
tal
Ce
ntr
al S
ec
tor
Sta
te S
ec
tor
JV
Pri
va
te S
ec
tor
Gra
nd
To
tal
3000 0 0 3000 0 0 0 0 18000 3000 6000 27000 5205 19665 4260 29130 800 21786 0 22586 27005 44451 10260 81716
Apr19 Programme 0 0 0 0 0 0 0 0 3000 0 3000 6000 0 1000 2000 3000 0 800 0 800 3000 1800 5000 9800
Achievement 0 0 0 0 0 0 0 0 500 0 0 500 815 1980 0 2795 0 1305 0 1305 1315 3285 0 4600
Upto Apr-19 Programme 0 0 0 0 0 0 0 0 3000 0 3000 6000 0 1000 2000 3000 0 800 0 800 3000 1800 5000 9800
Achievement 0 0 0 0 0 0 0 0 500 0 0 500 815 1980 0 2795 0 1305 0 1305 1315 3285 0 4600
21(1)
220 kV Grand Total 800 kV 500 kV
Programme 2019-20
Programme
Achievement
HVDC765 kV 400 kV
As on 30-04-19
Sl Voltage Ratio Capacity
No (kVkV) (MWMVA)
1 2 3 4 5
1 Bhadla SS (3x1500 3x500 MVA) 765400 PGCIL 500
2 Extn at Tumkur (Pavagada ) PS (2x500 MVA) 400220 PGCIL 500
3 Bongaigaon (2nd ICT) Ss 400220 PGCIL 315
Total of CENTRAL SECTOR 1315
4 Motiram Adda Gorakhpur (Aug) (Additional TF) 400220 UPPTCL 240
5 Muradnagar-II Ghaziabad (Aug) (Additional TF) 400220 UPPTCL 240
6 Noida Sec- 148 GBNagar (New) 400220 UPPTCL 5007 Sarnath Varanasi (Aug) TF- II (500-315) 400220 UPPTCL 1858 Sarojininagar Lucknow Aug) TF- II (500-315) 400220 UPPTCL 185
9 Unnao (Aug) TF-III 400220 UPPTCL 31510 Nawada SS 400220 HVPNL 31511 Kharepatan SS 22033 MSETCL 2512 Prathipadu SS 220132 APTRANSCO 10013 Pali Ss 22066 HVPNL 160
14 A-5 Faridabad Ss 22066 HVPNL 60
15 Rentachintala Ss Aug(3X100-2x100) 220132 APTRANSCO 10016 Amethi Ss 220132 UPPTCL 160
17 Gajokhar Varanasi (Aug) TF- II (160-100) 220132 UPPTCL 60
18 Gola Gorakhpur (New) 220132 UPPTCL 160
19 Khurja Bulandshahr (Aug) TF- II (200-160) 220132 UPPTCL 40
20 RC Green GB Nagar (Aug) TF-II (160-100) 220132 UPPTCL 60
21 Sikandrabad Bulandshahr (Aug) (Additional TF) 220132 UPPTCL 160
22 Sitapur (Aug) (Additional TF) 220132 UPPTCL 160
23 Sohawal Ayodhya (Aug) TF-II (160-100) 220132 UPPTCL 60
TOTAL STATE SECTOR 3285
GRAND TOTAL 4600
21(2)
CENTRAL SECTOR
STATE SECTOR
2Sub-Stations (220 kV and above) CommissionedReady for commissioning During Apr-2019
Name of Sub Stations Executing Agency
SN Contents Page
1 Electricity Generation (MU) Targets and Achievements for 2019-20 22
Section E - Electricity Generation
Programme Achievement Ach Programme Achievement Ach
Central Sector 37545100 3177900 3129530 9848 3177900 3129530 9848
State Sector 37498600 3322500 2950558 8881 3322500 2950558 8881
PvtIPP Sector 37346200 3236400 3195940 9875 3236400 3195940 9875
PvtUTL Sector 1823100 159300 165579 10394 159300 165579 10394
Total 114213000 9896100 9441607 9541 9896100 9441607 9541
Central Sector 5661700 386100 481390 12468 386100 481390 12468
State Sector 6680500 498200 536514 10769 498200 536514 10769
PvtIPP Sector 1206900 57300 80405 14032 57300 80405 14032
PvtUTL Sector 144100 12300 10930 8886 12300 10930 8886
Total 13693200 953900 1109239 11628 953900 1109239 11628
Central Sector 4472000 367300 317765 8651 367300 317765 8651
Total 4472000 367300 317765 8651 367300 317765 8651
Bhutan Import 621800 17500 24396 13941 17500 24396 13941
Central Sector 47678800 3931300 3928685 9993 3931300 3928685 9993
State Sector 44179100 3820700 3487072 9127 3820700 3487072 9127
Pvt Sector 40520300 3465300 3452854 9964 3465300 3452854 9964
Total 133000000 11234800 10893007 9696 11234800 10893007 9696
Provisional based on actual-cum-Assesment
Figs in MU
Cummulative
Achievement
Cummulative
Achievement
Mar-19 Mar-18 Upto Mar-2019 Upto Mar-2018
984785 869291 12675910 10183949
22
1 Electricity Generation (MU) Targets and Achievememts for 2019-20
All India Energy Generation During Apr-19 to Apr-19 (MU)
Target (2019-20)Apr-19 to Apr-19
Sector
Hydro
Thermal
Nuclear
Renewable Energy Generation
Achievement
Apr-2019
98961
95393673
112348
94416
11092
3178
108930
0
20000
40000
60000
80000
100000
120000
Thermal Hydro Nuclear Total
Programme
Achievement
SN Contents Page
1 Energy Power Supply Position (Provisional) for Apr-2019 and during Apr-19 to Apr-19 23
2 Peak Power Supply Position (Provisional) for Apr-2019 and during Apr-19 to Apr-19 24
3 Energy Power Supply Position (Revised) for Mar-2019 and during Apr-19 to Mar-19 25
4 Peak Power Supply Position (Revised) for Mar-2019 and during Apr-19 to Mar-19 26
5 Notified Power cuts Restrictions on Industries during Apr-2019 27
6 Power Supply to Agricultural Sector during Apr-2019 28
Section F - Power supply position
आकड़ मममलयन यननट नट Figures in MU net
ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied
कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )
चडीगढ़ Chandigarh 117 117 0 00 117 117 0 00
दिलली Delhi 2698 2698 1 00 2698 2698 1 00
हरियजणज Haryana 3773 3773 0 00 3773 3773 0 00
दहमजचल परिश Himachal Pradesh 777 777 0 00 777 777 0 00
रमम कशमीि Jammu amp Kashmir 1604 1296 308 192 1604 1296 308 192
परजब Punjab 3646 3646 0 00 3646 3646 0 00
िजरसथजन Rajasthan 6210 6208 2 00 6210 6208 2 00
उतति परिश Uttar Pradesh 10179 10148 32 03 10179 10148 32 03
उततिजखड Uttarakhand 1120 1120 0 00 1120 1120 0 00
उततरी कषतर Northern Region 30094 29786 308 10 30094 29786 308 10
छततीसगढ़ Chhattisgarh 2684 2676 8 03 2684 2676 8 03
गरिजत Gujarat 10718 10718 0 00 10718 10718 0 00
मधय परिश Madhya Pradesh 6006 6006 0 00 6006 6006 0 00
महजिजषटर Maharashtra 14308 14308 0 00 14308 14308 0 00
िमन औि दिउ Daman amp Diu 220 220 0 00 220 220 0 00
िजिि व नगि हवली Dadra amp Nagar Haveli 552 552 0 00 552 552 0 00
गोवज Goa 388 388 0 00 388 388 0 00
पशचिमी कषतर Western Region 34875 34868 8 00 34875 34868 8 00
आनधर परिश Andhra Pradesh 5708 5708 0 00 5708 5708 0 00
तलगजनज Telangana 5725 5725 0 00 5725 5725 0 00
कनजाटक Karnataka 7003 7003 0 00 7003 7003 0 00
किल Kerala 2402 2400 2 01 2402 2400 2 01
तममल नजड Tamil Nadu 10010 10010 0 00 10010 10010 0 00
पडचिी Puducherry 263 263 0 00 263 263 0 00
लकष-दवीप Lakshadweep 4 4 0 0 4 4 0 0
दकषकषणी कषतर Southern Region 31111 31109 2 00 31111 31109 2 00
बबहजि Bihar 2589 2589 0 00 2589 2589 0 00
िजमोिि घजटी ननगम DVC 1772 1772 0 00 1772 1772 0 00
झजिखणड Jharkhand 689 689 0 00 689 689 0 00
ओडडशज Odisha 2689 2689 1 00 2689 2689 1 00
पशशचम बगजल West Bengal 5075 5075 0 00 5075 5075 0 00
मसशककम Sikkim 37 37 0 00 37 37 0 00
अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 7 29 27 2 7
परवी कषतर Eastern Region 12851 12850 1 00 12851 12850 1 00
अरणजचल परिश Arunachal Pradesh 66 66 0 05 66 66 0 05
असम Assam 766 709 57 75 766 709 57 75
मणणपि Manipur 68 67 1 15 68 67 1 15
मघजलय Meghalaya 170 160 10 59 170 160 10 59
ममज़ोिम Mizoram 54 53 0 08 54 53 0 08
नजगजलड Nagaland 54 54 0 08 54 54 0 08
बिपिज Tripura 122 120 1 12 122 120 1 12
उततर-परवी कषतर North-Eastern Region 1300 1228 71 55 1300 1228 71 55
समपणण भारत All India 110231 109842 389 04 110231 109842 389 04
23
ऊरजा पनत ा म कमी ऊरजा पनत ा म कमीEnergy not Supplied
Excludes energy exported to Bangladesh
Energy not Supplied
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
ऊराण वरवदयत आपरत ण शथिरत ररपोरण (परवाणरवलोकन) Energy Power Supply Position Report (Provisional)
राजयState
अपरल 2019 April2019 अपरल2019 -अपरल2019 April2019 to April2019
अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met
कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )
चडीगढ़ Chandigarh 256 256 0 00 256 256 0 00
दिलली Delhi 5664 5664 0 00 5664 5664 0 00
हरियजणज Haryana 8127 8127 0 00 8127 8127 0 00
दहमजचल परिश Himachal Pradesh 1387 1387 0 00 1387 1387 0 00
रमम कशमीि Jammu amp Kashmir 2826 2261 565 200 2826 2261 565 200
परजब Punjab 7015 7015 0 00 7015 7015 0 00
िजरसथजन Rajasthan 10560 10560 0 00 10560 10560 0 00
उतति परिश Uttar Pradesh 19935 19935 0 00 19935 19935 0 00
उततिजखड Uttarakhand 1922 1922 0 00 1922 1922 0 00
उततरी कषतर Northern Region 54476 53985 491 09 54476 53985 491 09
छततीसगढ़ Chhattisgarh 4596 4574 22 05 4596 4574 22 05
गरिजत Gujarat 17871 17865 6 00 17871 17865 6 00
मधय परिश Madhya Pradesh 10018 10018 0 00 10018 10018 0 00
महजिजषटर Maharashtra 23158 23150 8 00 23158 23150 8 00
िमन औि दिउ Daman amp Diu 341 340 1 02 341 340 1 02
िजिि व नगि हवली Dadra amp Nagar Haveli 818 818 0 00 818 818 0 00
गोवज Goa 594 594 0 00 594 594 0 00
पशचिमी कषतर Western Region 56242 56222 20 00 56242 56222 20 00
आनधर परिश Andhra Pradesh 9151 9151 0 00 9151 9151 0 00
तलगजनज Telangana 10191 10191 0 00 10191 10191 0 00
कनजाटक Karnataka 12681 12681 0 00 12681 12681 0 00
किल Kerala 4309 4300 8 02 4309 4300 8 02
तममल नजड Tamil Nadu 15972 15972 0 00 15972 15972 0 00
पडचिी Puducherry 482 480 2 05 482 480 2 05
लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0
दकषकषणी कषतर Southern Region 49155 49103 52 01 49155 49103 52 01
बबहजि Bihar 5357 5357 0 00 5357 5357 0 00
िजमोिि घजटी ननगम DVC 3039 3039 0 00 3039 3039 0 00
झजिखणड Jharkhand 1266 1266 0 00 1266 1266 0 00
ओडडशज Odisha 5389 5389 0 00 5389 5389 0 00
पशशचम बगजल West Bengal 8666 8666 0 00 8666 8666 0 00
मसशककम Sikkim 100 100 0 00 100 100 0 00
अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7
परवी कषतर Eastern Region 23349 23349 0 00 23349 23349 0 00
अरणजचल परिश Arunachal Pradesh 139 136 3 22 139 136 3 22
असम Assam 1712 1667 45 26 1712 1667 45 26
मणणपि Manipur 197 188 9 46 197 188 9 46
मघजलय Meghalaya 336 336 0 00 336 336 0 00
ममज़ोिम Mizoram 116 113 3 26 116 113 3 26
नजगजलड Nagaland 157 131 26 166 157 131 26 166
बिपिज Tripura 292 291 1 03 292 291 1 03
उततर-परवी कषतर North-Eastern Region 2848 2780 68 24 2848 2780 68 24
समपणण भारत All India 177411 176810 601 03 177411 176810 601 03
24
मजग की पनत ा म कमी Demand not Met
Excludes the supply to Bangladesh
राजयStateअपरल 2019 April2019
मजग की पनत ा म कमी Demand not Met
अधिकतम वरवदयत आपरत ण शथिरत ररपोरण (परवाणरवलोकन) Peak Power Supply Position Report (Provisional)
आकड़ मगज वजट नट Figures in MW netअपरल2019 -अपरल2019 April2019 to April2019
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
आकड़ मममलयन यननट नट Figures in MU net
ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied
कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )
चडीगढ़ Chandigarh 96 96 0 00 1561 1561 0 00
दिलली Delhi 1931 1930 1 00 32299 32282 17 01
हरियजणज Haryana 3658 3658 0 00 53665 53665 0 00
दहमजचल परिश Himachal Pradesh 832 830 2 02 9850 9618 232 24
रमम कशमीि Jammu amp Kashmir 1767 1414 353 200 19593 15868 3725 190
परजब Punjab 3585 3585 0 00 55288 55275 13 00
िजरसथजन Rajasthan 6774 6770 4 01 79826 79637 189 02
उतति परिश Uttar Pradesh 8754 8691 63 07 117101 116118 984 08
उततिजखड Uttarakhand 1067 1067 0 00 13845 13753 92 07
उततरी कषतर Northern Region 28464 28041 423 15 383028 377776 5251 14
छततीसगढ़ Chhattisgarh 2464 2457 8 03 26130 26076 54 02
गरिजत Gujarat 9890 9890 0 00 116588 116572 15 00
मधय परिश Madhya Pradesh 6236 6236 0 00 75667 75665 2 00
महजिजषटर Maharashtra 13631 13631 0 00 158285 158148 137 01
िमन औि दिउ Daman amp Diu 221 221 0 00 2557 2557 0 00
िजिि व नगि हवली Dadra amp Nagar Haveli 553 553 0 00 6317 6317 0 00
गोवज Goa 362 362 0 00 4283 4280 3 01
पशचिमी कषतर Western Region 33357 33349 8 00 389827 389615 212 01
आनधर परिश Andhra Pradesh 6072 6071 1 00 63735 63677 58 01
तलगजनज Telangana 6930 6929 1 00 66697 66635 62 01
कनजाटक Karnataka 7614 7612 1 00 71759 71690 69 01
किल Kerala 2489 2488 1 00 25029 24911 118 05
तममल नजड Tamil Nadu 10247 10245 2 00 109375 109273 102 01
पडचिी Puducherry 252 251 1 04 2761 2751 10 03
लकष-दवीप Lakshadweep 4 4 0 0 46 46 0 0
दकषकषणी कषतर Southern Region 33605 33597 8 00 339355 338938 417 01
बबहजि Bihar 2319 2318 1 00 30052 29827 225 07
िजमोिि घजटी ननगम DVC 1773 1772 1 00 22365 21995 369 17
झजिखणड Jharkhand 698 697 1 01 8682 8461 221 25
ओडडशज Odisha 2583 2582 1 00 31810 31781 30 01
पशशचम बगजल West Bengal 4585 4584 2 00 52237 52078 159 03
मसशककम Sikkim 41 41 0 00 513 512 0 01
अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 67 346 323 23 67
परवी कषतर Eastern Region 11999 11995 5 00 145658 144654 1004 07
अरणजचल परिश Arunachal Pradesh 61 60 0 06 864 855 9 10
असम Assam 680 656 23 34 9532 9204 328 34
मणणपि Manipur 68 68 1 09 916 906 10 11
मघजलय Meghalaya 173 173 0 03 1955 1953 1 01
ममज़ोिम Mizoram 50 49 0 09 668 661 8 12
नजगजलड Nagaland 58 57 1 20 902 809 93 103
बिपिज Tripura 150 150 0 00 1859 1837 21 11
उततर-परवी कषतर North-Eastern Region 1240 1214 26 21 16696 16225 471 28
समपणण भारत All India 108665 108196 469 04 1274564 1267209 7355 06
Note The revised data for March 2019 is not avaliable
Excludes energy exported to Bangladesh
राजयState
ऊराण वरवदयत आपरत ण शथिरत ररपोरण (परवाणरवलोकन) Energy Power Supply Position Report (Provisional)
25
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
Energy not Supplied Energy not Supplied
मािण2019 March2019 अपरल2018 -मािण2019 April2018 to March2019
ऊरजा पनत ा म कमी ऊरजा पनत ा म कमी
अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met
कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )
चडीगढ़ Chandigarh 223 223 0 00 369 369 0 00
दिलली Delhi 4016 4016 0 00 7016 7016 0 00
हरियजणज Haryana 6544 6544 0 00 10270 10270 0 00
दहमजचल परिश Himachal Pradesh 1683 1683 0 00 1700 1700 0 00
रमम कशमीि Jammu amp Kashmir 3277 2622 655 200 3277 2622 655 200
परजब Punjab 6564 6564 0 00 12638 12638 0 00
िजरसथजन Rajasthan 11885 11885 0 00 13276 13276 0 00
उतति परिश Uttar Pradesh 16220 16220 0 00 20498 20062 436 21
उततिजखड Uttarakhand 2002 2002 0 00 2216 2216 0 00
उततरी कषतर Northern Region 47925 47356 569 12 63166 61726 1440 23
छततीसगढ़ Chhattisgarh 4444 4128 316 71 4444 4270 174 39
गरिजत Gujarat 16263 16263 0 00 17053 16963 90 05
मधय परिश Madhya Pradesh 12328 12323 5 00 13815 13815 0 00
महजिजषटर Maharashtra 22361 22291 70 03 23864 23254 610 26
िमन औि दिउ Daman amp Diu 336 336 0 01 357 356 1 02
िजिि व नगि हवली Dadra amp Nagar Haveli 800 799 1 01 816 815 1 01
गोवज Goa 538 538 0 00 596 596 0 00
पशचिमी कषतर Western Region 53132 52965 167 03 56675 55821 853 15
आनधर परिश Andhra Pradesh 8977 8977 0 00 9459 9453 6 01
तलगजनज Telangana 10471 10471 0 00 10815 10815 0 00
कनजाटक Karnataka 12841 12841 0 00 12841 12841 0 00
किल Kerala 4264 4228 36 09 4264 4228 36 09
तममल नजड Tamil Nadu 15712 15712 0 00 15712 15712 0 00
पडचिी Puducherry 427 412 15 34 427 412 15 34
लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0
दकषकषणी कषतर Southern Region 49464 49464 0 00 49464 49464 0 00
बबहजि Bihar 4633 4633 0 00 5115 5084 31 06
िजमोिि घजटी ननगम DVC 3035 3035 0 00 3035 3035 0 00
झजिखणड Jharkhand 1210 1210 0 00 1339 1291 48 36
ओडडशज Odisha 4827 4827 0 00 5357 5357 0 00
पशशचम बगजल West Bengal 8287 8287 0 00 9130 9123 7 01
मसशककम Sikkim 100 100 0 00 106 106 0 00
अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7
परवी कषतर Eastern Region 21658 21658 0 00 23141 22733 408 18
अरणजचल परिश Arunachal Pradesh 133 131 2 15 138 138 0 01
असम Assam 1539 1508 31 20 1865 1809 56 30
मणणपि Manipur 204 199 5 25 219 216 3 12
मघजलय Meghalaya 357 357 0 00 374 372 1 04
ममज़ोिम Mizoram 108 105 3 28 121 119 2 17
नजगजलड Nagaland 127 125 2 16 156 138 18 116
बिपिज Tripura 249 249 0 00 298 293 5 17
उततर-परवी कषतर North-Eastern Region 2540 2535 5 02 2967 2850 117 39
समपणण भारत All India 169464 168745 719 04 177022 175528 1494 08
Note The revised data for March 2019 is not avaliable 26
अधिकतम वरवदयत आपरत ण शथिरत ररपोरण (परवाणरवलोकन) Peak Power Supply Position Report (Provisional)
आकड़ मगज वजट नट Figures in MW net
राजयStateमािण2019 March2019 अपरल2018 -मािण2019 April2018 to March2019
मजग की पनत ा म कमी मजग की पनत ा म कमी Demand not MetDemand not Met
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
Excludes the supply to Bangladesh
अपरल 2019 April2019 अपरल2018 -मािण2019 April2019 to April2019
उततरी कषतर Northern Region
चडीगढ़ Chandigarh(Data Not Received)दिलली Delhi
हरियजणज Haryana
दहमजचल परिश Himachal Pradeshरमम कशमीि Jammu amp Kashmir(Data
Not Received)परजब Punjab
िजरसथजन Rajasthanउतति परिश Uttar Pradesh
उततिजखड Uttarakhand
पशचिमी कषतर Western Region
छततीसगढ़ Chhattisgarh
Apr-Nov 2018- No cuts
Maximum Demand cut-58MW
Energy cut- 00020-00032 MUsday
गरिजत Gujarat
मधय परिश Madhya Pradesh
महजिजषटर Maharashtra
गोवज Goa
दकषकषणी कषतर Southern Region
आनधर परिश Andhra Pradesh
तलगजनज Telangana
कनजाटक Karnataka
किल Kerala
तममल नजड Tamil Nadu
पडचिी Puducherryपरवी कषतर Eastern Region
बबहजि Bihar
झजिखणड Jharkhand
ओडडशज Odisha
पशशचम बगजल West Bengal
No N
otifie
d Cu
ts
27
मािण 2019 म इडथरीर पर वरवदयत करौती का वरवरवरण Notified Power CutsRestrictions on Industries during April2019
राजय कषतर State Regionऊराणमाग करौती EnergyDemand Cut
No N
otifie
d Cu
tsNo
Notifie
d Cu
ts
अपरल2019 April 2019 अपरल2019 -अपरल2019 April2019 to April2019
उततरी कषतर Northern Region
चडीगढ़ Chandigarh Data not received Data not received
दिलली Delhi Data not received Data not received
हरियजणज Haryana 0811 hrsday 0811 hrsday
दहमजचल परिश Himachal Pradesh HPSEBL has only 2 agriculture consumers and uninterrupted
power is being supplied to agriculture sector
HPSEBL has only 2 agriculture consumers and uninterrupted
power is being supplied to agriculture sector
रमम कशमीि Jammu amp Kashmir Data not received Data not received
परजब Punjab 379 hrsday 379 hrsday
िजरसथजन Rajasthan 0630 hrsday 0630 hrsday
उतति परिश Uttar Pradesh 2157 hrsday 2157 hrsday
उततिजखड Uttarakhand 2359 hrsday 2359 hrsday
पशचिमी कषतर Western Region
छततीसगढ़ Chhattisgarh 18 hrsday 18 hrsday
गरिजत Gujarat 8 hrsday 8 hrsday
मधय परिश Madhya Pradesh Three-Phase Supply(Irrigation)- 0953 hrs day Three-Phase
(Mixed) Supply - 2334 hrs day
Three-Phase Supply(Irrigation)- 0953 hrs day Three-Phase
(Mixed) Supply - 2334 hrs day
महजिजषटर Maharashtra Three-Phase Supply(Irrigation)- 9 hrs day Three-Phase Supply(Irrigation)- 9 hrs day
गोवज Goa No restriction No restriction
दकषकषणी कषतर Southern Region
आनधर परिश Andhra Pradesh 07 hrsday 07 hrsday
तलगजनज Telangana 24 hrsday 24 hrsday
कनजाटक Karnataka 6 hrsday 6 hrsday
किल Kerala No Restrictions No Restrictions
तममल नजड Tamil Nadu 9 hrsday (6 hrs during day time and 3 hrs during night time) 9 hrsday (6 hrs during day time and 3 hrs during night time)
पडचिी Puducherry No Restrictions No Restrictions
परवी कषतर Eastern Region
बबहजि Bihar 18 hrsday 18 hrsday
झजिखणड Jharkhand 20 hrsday 20 hrsday
ओडडशज Odisha 24 hrsday 24 hrsday
पशशचम बगजल West Bengal 23 hrsday 23 hrsday
28
मारच 2019 कषि कषतर को षिदयत आपरतच का षििरण Power Supply to Agricultural Sector during March2019
राजय कषतर State Regionऔसत वरवदयत आपरत ण घनरो म Average Hours of Supply
On segregated feeders
SNo Contents Page
1 Growth of Installed Capacity since 6th Plan 29
2 Progress of Transmission Sector since 6th Plan 30
3 All India Yearly Coal consumption for Power Generation (Utilities)
4 All India Annual Per Capita Consumption of Electricity since -2006
5 Average cost of power supply amp Average realisation (Paisakwh)
6 Growth of Rural Electrification amp Pump Sets Energisation
7 Status of Hydro Schemes Cleared by the CEA in Apr-2019
Section G - Growth of Power Sector
31
32
(In MW)
Coal Gas Diesel Total
End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472
End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634
End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537
End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596
End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921
End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703
End of 12th Plan 19216288 2532938 83763 21832988 6780 4447842 50018 31960630
Up to Apr-2019 20070450 2493722 63763 22627934 678000 4539922 7764163 35610019
Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-17) = 51529 MW
Electricity Generation (MU) Targets and Achievements for 2016-17
Coal Gas Diesel Nuclear Hydro Res Total
2007045 2493722 637629 678000 453992 77641625 22925174
29
1 Growth of Installed Capacity Since 6th Plan
Plan YearThermal
Nuclear Hydro RES (MNRE) Total
2007045
2493722637629
678000
4539922
77641625
Total Installed Capacity 35610019 MW
Coal Gas Diesel Nuclear Hydro Res
Progress of Transmission Sector in the Country up to April 2019
1 TRANSMISSION LINES (All fig in CKM)
At the end of
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
6th plan 0 0 0 0 0 0 0 0 0 0 0 0 1831 4198 0 6029 1641 44364 0 46005 3472 48562 0 52034
7th plan 0 0 0 0 0 0 0 0 0 0 0 0 13068 6756 0 19824 4560 55071 0 59631 17628 61827 0 79455
8th plan 0 0 0 0 1634 0 0 1634 0 0 0 0 23001 13141 0 36142 6564 73036 0 79600 31199 86177 0 117376
9th plan 0 0 0 0 3234 1504 0 4738 751 409 0 1160 29345 20033 0 49378 8687 88306 0 96993 42017 110252 0 152269
10th plan 0 0 0 0 4368 1504 0 5872 1775 409 0 2184 48708 24730 0 73438 9444 105185 0 114629 64295 131828 0 196123
11th Plan 0 0 0 0 5948 1504 1980 9432 4839 411 0 5250 71023 30191 5605 106819 10140 125010 830 135980 91950 157116 8415 257481
12th Plan 6124 0 0 6124 5948 1504 1980 9432 25465 1177 4598 31240 92482 48240 17065 157787 11014 151276 978 163268 141033 202197 24621 367851
13th Plan (Up
to Mar2019)6124 0 0 6124 5948 1504 1980 9432 33692 1512 6605 41809 101335 58238 21173 180746 11734 162552 1010 175296 158833 223806 30768 413407
13th Plan (Up
to Apr-19)6124 0 0 6124 5948 1504 1980 9432 33745 1512 6605 41862 101335 58258 21173 180766 11734 162953 1010 175697 158886 224227 30768 413881
27150 600 MW of 132 kV Inter-Regional power transmission capacity links which are operated radially from time to time is not added in the total
75050
47900
24000
99050
30
Grand Total
Note - The figure upto the end of 10th plan in for stringing progress including the lines not commissioned Now only commissioned lines are reckoned Accordingly the figure for 10th plan (end) may read
as 187555 after adjusting with (-) 10852 Ckm
Inter-regional Power Transfer Capacity (MW)
plusmn 800 kV HVDC plusmn 500 kV HVDC 765 kV 400 kV 220 kV
IR addition in 12th
Plan (up to March
2017)
Inter-regional
Transmission
Capacity at the end
of Plan Period 2017-
22 (as on April19)
IR at the end of 11th
PlanIR at the end of 12th
Plan
IR Capacity Addition
at the end of Plan
Period 2017-22 (Till
April 19)
2004-05 27800
2005-06 28100
2006-07 30200
2007-08 33000
2008-09 35500
2009-10 36700
2010-11 38700
2011-12 41756
2012-13 45460
2013-14 48940
2014-15 53040
2015-16 54590
2016-17 57430
2017-18 60800
2018-19 62890
Year
2005-06
2006-07
2007-08
2008-09
2009-10
2010-11
2011-12
2012-13
2013-14
2014-15
2015-16
2016-17
2017-18
2018-19
2004-05 254 209 7568
2005-06 260 221 7636
2006-07 276 227 7423
2007-08 293 239 7727
2008-09 340 263 8713
2009-10 355 268 8870
2010-11 398 303 11975
2011-12 455 330 13514
2012-13 501 376 14867
2013-14 518 175
2014-15 520
Source- PFC Reports on the performance of State Power Utilities 31
1181
7335
7786
91441
8188
88363
957
1010
1075
1122
1149
(GrossGen+ Net Import) Mid-year population Provisional
5 Average cost of power supply amp average realization ( paiseKWH )
Yearcost of supply
(paiseunit)
Realization(paiseunit)
Including AgricultureOnly
Agriculture
6719
7171
3 All India yearly Coal Consumption for Power Generation (Utilities)
YEARCoal Consumption
Million Tonnes
4 All India Annual per Capita consumption of Electricity Since 2006
Per Capita Consumption ( kWh)
6314
Sl
NoExecuting Agency
Installed
Capacity (MW)Cost (Rs crore)
Date of
Clearance
32
Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as
Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received
from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made
available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified
villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is
independent of the earlier published reports
No Hydro Electric Project has been issued concurrenceAppraisal letter by CEA during April 2019
7 Status of Hydro Schemes Cleared by the CEA in Apr-2019
Name of Scheme
1999-002000-01
297594
010408 to 310309010409 to 310310
10th Plan
2005-062006-07
322968331020
6 Growth Of Rural Electrification amp Pumpsets Energisation
Plan Year
9th Plan2002-03
134092626
4111
Pump Sets Energised Villages Electricfied (Nos)
2001-02
284064367244
1218
27801997-981998-99
3207
482864
12632
1576036
4451722594
15455554
2314176
397343611750
2093311060316074
65109527813884
46708
18423975
499150
2003-042004-05
5743
9769
Cumu upto End of 10th Plan
010407 to 310308
010410 to 310311557976840909
010411 to 310312
412667
86293726
No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification
since 2004-05
65291374575 296361511th Plan
Cumu upto End of 11th Plan
596556 21212860
557439Cummulative up to end of 12th Plan
SN Contents Page
1 Rate of sale of power for the year 2016-17 33-41
RATE OF SALE OF POWER FOR THE YEAR 2016-17
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) NORTHERN REGION
CENTRAL SECTOR
BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 18000 66900 19800
CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 54000 222400 21600
CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 30000 144400 19600
CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 23100 91700 42600
PARBATI - III HPS NHPC LTD HYDRO-HYDRO 52000 68200 54800
DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 28000 95600 30000
CHUTAK NHPC LTD HYDRO-HYDRO 4400 22000 79800
DULHASTI HPS NHPC LTD HYDRO-HYDRO 39000 228000 56400
SALAL HPS NHPC LTD HYDRO-HYDRO 69000 342300 11000
TANAKPUR HPS NHPC LTD HYDRO-HYDRO 9420 43000 29600
URI HPS -I NHPC LTD HYDRO-HYDRO 48000 280300 16000
URI HPS - II NHPC LTD HYDRO-HYDRO 24000 147300 48600
NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 4500 24600 88200
SEWA - II NHPC LTD HYDRO-HYDRO 12000 47100 43400
ANTA CCPP NTPC LTD THERMAL-GASN 41930 67539 32400
AURAIYA CCPP NTPC LTD THERMAL-GASN 66336 53501 39100
BADARPUR TPS NTPC LTD THERMAL-COAL 70500 159153 44800
DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 84000 296170 42300
DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 98000 526686 46300
DADRI CCPP NTPC LTD THERMAL-GASHSD 82978 227469 33000
FARIDABAD CCPP NTPC LTD THERMAL-GASN 43159 115577 30800
RIHAND STPS I NTPC LTD THERMAL-COAL 100000 596766 24500
RIHAND STPS II NTPC LTD THERMAL-COAL 100000 737069 24600
RIHAND STPS III NTPC LTD THERMAL-COAL 100000 706546 30600
SINGRAULI STPS NTPC LTD THERMAL-COAL 200000 1394068 20400
TANDA TPS NTPC LTD THERMAL-COAL 44000 295438 40800
UNCHAHAR TPS I NTPC LTD THERMAL-COAL 42000 256454 39800
UNCHAHAR TPS II NTPC LTD THERMAL-COAL 42000 273577 38900
UNCHAHAR TPS III NTPC LTD THERMAL-COAL 21000 142780 43000
KOLDAM NTPC LTD HYDRO-HYDRO 80000 363260 43600
NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 303575 25841
RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 108000 668677 35374
NJHPS SJVNL HYDRO-HYDRO 150000 699496 23820
RAMPUR HPS SJVNL HYDRO-HYDRO 41202 195982 32260
TEHRI HPP THDC HYDRO-HYDRO 100000 272543 51800
KOTESHWAR HEP THDC HYDRO-HYDRO 40000 106244 53400
IGSTPS JHAJJAR ARAVALI P CPL THERMAL-COAL 150000 510429 49490
NEYVELI BARSINGSAR NEYVELI LIG CORP LTD THERMAL-LIG 25000 127520 38040
STATE SECTOR
PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 21000 14222 48200
PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 21000 19205 48400
PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 25000 102257 42600
PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 25000 62107 41800
DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 60000 312213 41000
RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 120000 35767442200
WYC HYDEL STATION HPGCL HYDRO-HYDRO 6240 20365 24900
GIRI POWER HOUSE HPSEB HYDRO-HYDRO 6000 13958 7600
ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 1695 5467 11900
BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 12000 18528 6700
GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 2250 7462 22500
BASSI POWER HOUSE HPSEB HYDRO-HYDRO 6600 29649 7500
BINWA POWER HOUSE HPSEB HYDRO-HYDRO 600 2749 19300
ANNEXURE-I
RATE OF SALE OF POWER FOR THE YEAR 2016-2017
Page 33
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) GAJ POWER HOUSE HPSEB HYDRO-HYDRO 1050 2914 26700
BANER POWER HOUSE HPSEB HYDRO-HYDRO 1200 2864 16200
HOLI POWER HOUSE HPSEB HYDRO-HYDRO 300 616 22500
THIROT POWER HOUSE HPSEB HYDRO-HYDRO 450 1126 22500
KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 1200 3064 22500
LARJI POWER HOUSE HPSEB HYDRO-HYDRO 12600 53677 23700
NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 250 750 31000
CHABA POWER HOUSE HPSEB HYDRO-HYDRO 175 465 23300
RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 150 101 13400
SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 200 000 22500
KILLAR HPSEB HYDRO-HYDRO 030 050 22500
BHABA AUGUMENP H HPSEB HYDRO-HYDRO 450 1276 22500
BS CHAMBA HPSEB HYDRO-HYDRO 045 099 19500
GUMMA HPSEB HYDRO-HYDRO 300 423 22500
GAS TURBINE POWER STATION IPGCL THERMAL-GAS 27000 67233 39300
PPS-I PPCL THERMAL-GAS 33000 175905 38300
PPS-III PPCL THERMAL-GAS 137120 196879 36100
LOWER JHELUM JampKPDD HYDRO-HYDRO 10500 60214 5100
UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 2260 10514 6300
UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 10500 44202 8500
GANDHARBAL JampKPDD HYDRO-HYDRO 1500 8925 4700
KARNAH MPH JampKPDD HYDRO-HYDRO 200 1122 31000
CHENANI I JampKPDD HYDRO-HYDRO 2330 10892 6600
CHENANI II JampKPDD HYDRO-HYDRO 200 1188 9300
CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 750 3634 14200
IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 375 2108 18500
IGO MERCHELLONG JampKPDD HYDRO-HYDRO 300 1572 29700
PAHALGAM MHP JampKPDD HYDRO-HYDRO 450 1713 32900
MARPACHOO JampKPDD HYDRO-HYDRO 075 375 29800
HAFTAL JampKPDD HYDRO-HYDRO 100 483 28700
SANJAK JampKPDD HYDRO-HYDRO 126 441 36000
SEWA-III JampKPDD HYDRO-HYDRO 900 3273 20200
BHADERWAH JampKPDD HYDRO-HYDRO 150 935 8900
BAZGO JampKPDD HYDRO-HYDRO 030 108 33300
SUMOOR JampKPDD HYDRO-HYDRO 010 045 35400
HUNDER JampKPDD HYDRO-HYDRO 040 176 26200
STAKNA JampKPDD HYDRO-HYDRO 400 1933 4100
KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 124000 662879 31360
SURATGARH TPS RRVUNL THERMAL-COAL 150000 402328 41730
CHHABRA TPS 1amp 2 RRVUNL THERMAL-COAL 50000 305946 36700
CHHABRA TPS 3 RRVUNL THERMAL-COAL 25000 151536 36700
CHHABRA TPS 4 RRVUNL THERMAL-COAL 25000 155896 36700
RAMGARH GT POWER PROJECT RRVUNL THERMAL-COAL 22050 43177 41800
RAMGARH GAS T P PROJECT 3 RRVUNL THERMAL-GAS 5000 93615 41800
DHOLPUR C C POWER PROJECT RRVUNL THERMAL-R-LNG 33000 9486 46110
MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 14000 20855 34192
MINI MICRO HYDEL (MMH) P S RRVUNL HYDRO-HYDRO 2385 851 37800
KALISINDH TPP 1 RRVUNL THERMAL-COAL 60000 341543 45000
KALISINDH TPP 2 RRVUNL THERMAL-COAL 60000 211588 45000
KHARA HEP UPJVNL HYDRO-HYDRO 7200 26654 7200
MATATILLA HEP UPJVNL HYDRO-HYDRO 3060 12219 6500
OBRA HEP UPJVNL HYDRO-HYDRO 9900 21517 6300
RIHAND UPJVNL HYDRO-HYDRO 30000 57369 5500
ANPARA A TPS UPRVUNL THERMAL-COAL 63000 317536 27000
ANPARA B TPS UPRVUNL THERMAL-COAL 100000 705605 22700
ANPARA D UPRVUNL THERMAL-COAL 100000 300158 39800
HARDUAGANJ TPS UPRVUNL THERMAL-COAL 16500 45817 49200
HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 50000 304389 46600
OBRA A TPS UPRVUNL THERMAL-COAL 28800 13158 34000
OBRA B TPS UPRVUNL THERMAL-COAL 100000 328124 21900
Page 34
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) PANKI TPS UPRVUNL THERMAL-COAL 21000 66488 50300
PARICHHA TPS UPRVUNL THERMAL-COAL 22000 38762 49400
PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 42000 231931 45600
PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 50000 276722 50400
CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 24000 70845 8290
CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 14400 75366 8390
DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 3375 9595 12080
DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 5100 18701 10520
KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4140 17359 12330
KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 12000 33001 9420
KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 3000 11953 8320
TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 9000 33983 12460
MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 30400 124510 16110
RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 19800 17897 10550
MPUR UTTARAKHAND JVNL HYDRO-HYDRO 930 5121 19200
PATHRI UTTARAKHAND JVNL HYDRO-HYDRO 2040 11636 14200
GALOGI UTTARAKHAND JVNL HYDRO-HYDRO 300 648 12500
PRIVATE SECTOR
MGTPP CLP INDIA PVT LTD THERMAL-COAL 132000 268902 41940
SHRINAGAR HEP ALAKNANDA HPCL HYDRO-HYDRO 33000 127414 48800
GAMA INFRAPROP CCPP GAMA INFRAPROP PVT THERMAL-GAS 22500 52686 47000
PPGCL (BARA) JP POWER VENTURES LTD THERMAL-COAL 198000 448200 38500
MALANA HEP MALANA PCL HYDRO-HYDRO 8600 26354 29792
MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 10000 30369 32580
ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 19200 56347 36079
KASHANG HEP H P PCL HYDRO-HYDRO 19500 5034 29200
BASPA-II HEP HBPCL HYDRO-HYDRO 30000 132769 13600
KARCHAM WANGTOO HEP HBPCL HYDRO-HYDRO 100000 434386 36600
RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 108000 582600 43700
RITHALA COMBI CY POWER PLANT TATA POWER DDL THERMAL-GAS 9480 000 11900
RAJPURA TPS NABHA POWER LTD THERMAL-GAS 140000 901484 39000
TALWANDI SABO POWER LTD TALWANDI SABO POWER LTD THERMAL-COAL 198000 636040 49548
ROJA THERMAL POWER STATION ROJA POWER SCL THERMAL-COAL 120000 727200 43400
KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 34400 63400
BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 36000 62600
MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 38200 60800
UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 37900 61500
KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 42300 58800
LALITPUR PGCL BAJAJ ENERGY PVT LTD THERMAL-COAL 198000 359400 47300
PRAYAGRAJ PGCL PRAYAGRAJ PGCL THERMAL-COAL 132000 448200 38595
KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 132000 783182 33438
WESTERN REGION
CENTRAL SECTOR
INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 100000 325333 23892
OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 52000 141663 34001
GANDHAR CCPP NTPC LTD THERMAL-GAS 65739 221924 28700
KAWAS CCPP NTPC LTD THERMAL-GASN 65620 167929 27000
KORBA I amp II NTPC LTD THERMAL-COAL 210000 1499171 20500
KORBA III NTPC LTD THERMAL-COAL 50000 358746 26600
SIPAT STPS I NTPC LTD THERMAL-COAL 198000 1479902 26800
SIPAT STPS II NTPC LTD THERMAL-COAL 100000 766549 26500
VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 126000 693142 25800
VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 100000 608781 23800
VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 100000 673475 27600
VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 100000 655924 32900
VINDHYACHAL STPS V NTPC LTD THERMAL-COAL 50000 328265 31700
MOUDA I NTPC LTD THERMAL-COAL 100000 343130 44500
MOUDA Ii NTPC LTD THERMAL-COAL 66000 40637 39900
RATNAGIRI GAS amp POWER PVT LTD RGPPL THERMAL-GAS 196708 442485 47000
KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 000 24729
TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 32000 201227 10740
Page 35
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 365122 19069
TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 787444 29324
STATE SECTOR
GSEG-HAZIRA15610 MW GUJARAT S ENEGEN LTD THERMAL-GAS 15610 1805 28200
GSEG-HAZIRA35143 MW GUJARAT S ENEGEN LTD THERMAL-GAS 35130 22276 51300
GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 21978 51800
AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 13929 26100
KORBA TPS EAST CSPGCL THERMAL-COAL 44000 198673 33880
DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 365808 27570
KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 316500 30420
HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 532878 19410
CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 515 58300
MTTPS CHAMPA U-I CSPGCL THERMAL-COAL 50000 220376 39000
MTTPS CHAMPA U-II CSPGCL THERMAL-COAL 50000 23709 10000
SHP GANGREL CSPGCL HYDRO-HYDRO 1000 2350 36790
BANGO HEP CSPGCL HYDRO-HYDRO 12000 14662 8900
MHP KORBA WEST CSPGCL HYDRO-HYDRO 170 859 38190
SIKASAR HEP CSPGCL HYDRO-HYDRO 700 418 26870
DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8843 74500
DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 19446 51500
GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 66388 71600
GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127488 41300
KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 96072 43900
KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 29841 56400
SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 184966 58800
UKAI 1-5 GSECL THERMAL-COAL 85000 204891 46900
UKAI TPS 6 GSECL THERMAL-COAL 50000 284448 48200
WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 271999 58300
WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 82808 44100
KADANA HPS GSECL HYDRO-HYDRO 24200 34433 16800
UKAI HPS GSECL HYDRO-HYDRO 30500 40585 6100
TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 123000 11500
BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 8900 10900
BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 7200 27500
JHINNA HPS MPPGCL HYDRO-HYDRO 2000 9700 18500
RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 44300 3400
GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 17300 4600
SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 4100 16900
MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 14600 27000
PENCH HPS MPPGCL HYDRO-HYDRO 16000 23700 8100
RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 3000 16900
AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 134400 35100
SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 283800 38700
SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 344600 34300
SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 111600 61600
SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 211800 58000
SSTPS PH-I MPPGCL THERMAL-COAL 120000 233100 84300
BHUSAWAL TPS MSPGCL THERMAL-COAL 142000 566258 51100
CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1365682 33700
KHAPERKHEDA MSPGCL THERMAL-COAL 134000 706207 39100
KORADI TPS MSPGCL THERMAL-COAL 62000 443206 42000
NASIK TPS MSPGCL THERMAL-COAL 63000 297275 47000
PARLI TPS MSPGCL THERMAL-COAL 113000 175934 71600
PARAS MSPGCL THERMAL-COAL 50000 267931 38700
URAN CCPP MSPGCL THERMAL-GAS 67200 320330 30600
KOYANA MSPGCL HYDRO-HYDRO 195600 328155 13100
SMALL HYDRO POWER PLANTS MSPGCL HYDRO-HYDRO 45400 93062 30500
BHIRA MSPGCL HYDRO-HYDRO 8000 10046 8400
TILLARI MSPGCL HYDRO-HYDRO 8900 10584 3100
SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 233298 20500
SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 87633 20500
PRIVATE SECTOR
Page 36
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 81282 46750
JNSTPP(JAYPEE NIGRIE) JP POWER VENTURES LTD THERMAL-COAL 132000 726695 29310
MB POWER MB POWER THERMAL-COAL 120000 345632 38310
ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 754922 28671
ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 780761 23495
ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 198000 1263784 32090
ADANI POWER MAHARA ADANI POWER LTD THERMAL-COAL 330000 1666191 34124
AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 170065 36827
SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 252035 45129
ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 458551 36000
ESSAR POWER MP LTD ESSAR POWER MP LTD THERMAL-COAL 60000 243040 28600
VEDANTA LTD (P P -I) VEDANTA LTD THERMAL-GAS 3000 15044 24000
VEDANTA LTD (P P -II) VEDANTA LTD THERMAL-GAS 3000 21293 24000
PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 8234600 24000
165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 5850 64390
145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 68717 40349
SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 132655 28776
SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 144686 38567
MUNDRA UMPPCOASTAL GUJARAT POWER
LTD THERMAL-IMP COAL 400000 2530300
23900
LANCO AMARKANTAK TPP PATHADIH
U-ILANCO AMARKAN POWER LTD THERMAL-COAL 30000 195500
29200
LANCO AMARKANTAK TPP PATHADIH
U-IILANCO AMARKAN POWER LTD THERMAL-COAL 30000 206900
27600
BARADARHA TPS D B POWER LTD THERMAL-COAL 120000 677373 29200
JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 405000 28900
JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 453000 40500
DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 339437 40700
TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 293400 44000
TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 137200 37000
TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 174900 44000
BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 92900 14100
BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23700 34300
KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 27600 48300
CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2530300 23900
BHANDARDRA HEP -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 2475 54900
SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 161400 26500
SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 445000 39000
SOTHERN REGION
CENTRAL SECTOR
NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 325699 54820
NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 305532 39880
NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 998805 38510
NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 113016 54070
NEYVELI TAMILNADU POWER LTD JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 625274 42200
VALLUR TPS NTPC TECL THERMAL-COAL 150000 856438 42350
R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 1493 84300
RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1502919 29400
RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 341291 31800
SIMHADRI I NTPC LTD THERMAL-COAL 100000 688382 36800
SIMHADRI II NTPC LTD THERMAL-COAL 100000 663657 43400
KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 593110 31324
MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 291625 21764
KKNPP-1 amp 2 NPCIL NUCLEAR-NUCLEAR 200000 572609 40948
MINICOY LAKSHADEEP THERMAL-DIESEL 340 770 29600
KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1097 29600
AMINI LAKSHADEEP THERMAL-DIESEL 265 509 29600
ANDROTT LAKSHADEEP THERMAL-DIESEL 219 524 29600
KALPENI LAKSHADEEP THERMAL-DIESEL 175 356 29600
AGATTI LAKSHADEEP THERMAL-DIESEL 195 658 29600
KADMAT LAKSHADEEP THERMAL-DIESEL 190 414 29600
KILTAN LAKSHADEEP THERMAL-DIESEL 150 269 29600
CHETLET LAKSHADEEP THERMAL-DIESEL 100 139 29600
BITRA LAKSHADEEP THERMAL-DIESEL 043 024 29600
BANGARAM LAKSHADEEP THERMAL-DIESEL 018 009 29600
Page 37
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) STATE SECTOR
Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 721811 46500
Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 50000 336142 46500
RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 237358 46500
RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 239926 46500
RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 124500 46500
SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 62109 46500
UPPER SILERU APGENCO HYDRO-HYDRO 24000 33000 46500
LOWER SILERU APGENCO HYDRO-HYDRO 46000 81066 46500
DONKARAI APGENCO HYDRO-HYDRO 2500 6007 46500
PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 1262 46500
CHETTIPETA APGENCO HYDRO-HYDRO 100 214 46500
MUCHKUND APGENCO HYDRO-HYDRO 12000 37571 46500
NAGARJUNASAGAR RCPH APGENCO HYDRO-HYDRO 9000 606 46500
TUNGABHADRA HES amp HAMPI(AP
Share)
APGENCO HYDRO-HYDRO 7200 6100 46500
KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 352232 42600
KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 288131 32500
KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 319272 46500
RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 40073 44300
KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 308317 46000
KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 308963 51300
SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 61004 76600
NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 17960 75300
PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 20873 58300
POCHAMPAD-I TSPGENCO HYDRO-HYDRO 2700 5455 29800
POCHAMPAD-II TSPGENCO HYDRO-HYDRO 900 1932 40700
NIZAMSAGAR TSPGENCO HYDRO-HYDRO 1000 1126 53400
RAICHUR TPS 1 to 7 KPCL THERMAL-COAL 147000 890866 43800
RAICHUR TPS 8 KPCL THERMAL-COAL 25000 159523 48200
BELLARI TPS 1 KPCL THERMAL-COAL 50000 318679 51100
BELLARI TPS 2 KPCL THERMAL-COAL 50000 232347 55600
BELLARI TPS 3 KPCL THERMAL-COAL 70000 47565 34400
BHADRA PH KPCL HYDRO-HYDRO 3920 2369 45900
GERUSUPPA PH KPCL HYDRO-HYDRO 24000 26990 22000
GHAT PRABHA HEP KPCL HYDRO-HYDRO 3200 4777 25300
KADRA HPS KPCL HYDRO-HYDRO 15000 16889 26800
NAGJHARI KPCL HYDRO-HYDRO 90000 155159 9800
KODASALLI DPH KPCL HYDRO-HYDRO 12000 14854 19200
MUNIRA+MGH+SPH+SPH KPCL HYDRO-HYDRO 22640 48211 7900
SHARAVATHY HPS KPCL HYDRO-HYDRO 108550 276215 5400
ALMATTI DPH KPCL HYDRO-HYDRO 29000 39611 24600
VARAHI UGPH KPCL HYDRO-HYDRO 46000 71368 15600
IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 17196 15300
IDUKKI HPS KSEB HYDRO-HYDRO 78000 137905 15300
KAKKAD HPS KSEB HYDRO-HYDRO 5000 13063 15300
KALLADA HPS KSEB HYDRO-HYDRO 1500 4436 15300
KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 46544 15300
KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 635 15300
LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 30822 15300
MALANKARA HPS KSEB HYDRO-HYDRO 1050 2474 15300
MATTUPETTY KSEB HYDRO-HYDRO 200 230 15300
MALAMPUZHA KSEB HYDRO-HYDRO 250 063 15300
CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 864 15300
URUMI ST I amp II KSEB HYDRO-HYDRO 615 903 15300
LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 248 15300
NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7765 19625 15300
PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 16601 15300
PANNIAR HPS KSEB HYDRO-HYDRO 3240 6217 15300
PORINGALKUTHU KSEB HYDRO-HYDRO 3600 10052 15300
PORINGALKUTHU LBE KSEB HYDRO-HYDRO 1600 9438 15300
PEPPARA KSEB HYDRO-HYDRO 300 395 15300
POOZHITHODE KSEB HYDRO-HYDRO 480 1045 15300
Page 38
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) PEECHI KSEB HYDRO-HYDRO 125 040 15300
RANI-PERUNADU KSEB HYDRO-HYDRO 400 585 15300
SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 79783 15300
SENGULAM HPS KSEB HYDRO-HYDRO 5120 11558 15300
SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 16711 15300
VILANGAD KSEB HYDRO-HYDRO 750 1578 15300
BARAPOLE KSEB HYDRO-HYDRO 1500 1932 15300
VELLATHOOVAL KSEB HYDRO-HYDRO 360 305 15300
CHIM0NY KSEB HYDRO-HYDRO 250 156 15300
ADYANPARA KSEB HYDRO-HYDRO 350 501 15300
BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 554 15300
KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 3801 15300
KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 23132 32800
ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 14416 62280
METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 523970 62280
METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 321270 62280
NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 336575 62280
NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 591240 62280
TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 508966 62280
KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 30897 62280
VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 18720 90699 62280
KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 33593 62280
BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 1047 62280
PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 1250 62280
PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 330 62280
MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 4897 62280
MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 032 62280
KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15681 62280
KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 40608 62280
KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 21342 62280
KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 4717 62280
KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4322 62280
KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2399 62280
METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 4416 62280
METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 8035 62280
BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2187 62280
BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2359 62280
BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2511 62280
BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 1949 62280
BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 1819 62280
POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 172 62280
SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 241 62280
MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 026 62280
THIRUMOORTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 136 62280
PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 9309 62280
VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 353 62280
SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 4192 62280
PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 6571 62280
SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 1186 62280
SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6319 62280
ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 6122 62280
KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 28674 62280
SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 18381 62280
SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 4258 62280
KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 12680 62280
KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4201 62280
ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 000 62280
PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 19175 62280
AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 078 62280
BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 504 62280
BHAVANI KATTALAI (BKB)(IIIampIII BB I amp II)TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 5847 62280
PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 000 62280
Page 39
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) SRI DAMODARAM STPS APPDCL THERMAL-COAL 160000 808108 36300
PRIVATE SECTOR
KARUPPUR TANJORE LANCO TANJORE PCL THERMAL-GAS 12000 48096 28770
SIMHAPURI ENERGY LTD SIMHAPURI ENERGY LTD THERMAL-COAL 60000 143900 39100
JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 7111 45500
SBU 1 JSW ENERGY LTD
VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 26000 159100
43300
SBU 2 JSW ENERGY LTD
VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 60000 247900
42800
LANCO KPLLANCO KONDAPALLI POWER
LTDTHERMAL-GAS 36814 85060
25776
LANCO KPL STG -IILANCO KONDAPALLI POWER
LTDTHERMAL-GAS 36600 12979
46330
LANCO KPL STG -IIIALANCO KONDAPALLI POWER
LTDTHERMAL-GAS 37100 85710
46330
LANCO KPL STG -III BLANCO KONDAPALLI POWER
LTDTHERMAL-GAS 37100 43639
46330
HINDUJA NATIONAL PCL HINDUJA NATIONAL PCL THERMAL-COAL 104000 303000 38200
MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 121164 49940
UDUPI POWER COR LTD ADANI POWER LTD THERMAL-COAL 120000 754613 42500
SPECTRUM POWER GENERATION
LTD SPECTRUM PG LTD THERMAL-GASN 20525 9256812
34952
TAQA NEYVELI POWER COM PVT
LTD TAQA NEYVELI THERMAL-LIG 25000 5840
34500
ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 251000 51000
ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 207860 36800
GMR VEMAGIRI POWER GENERATION
LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 30117
46450
EASTERN REGION
CENTRAL SECTOR
MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 64675 53113
MTPS STAGE - II KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 39000 1432 69138
BOKARO `B` TPS DVC THERMAL-COAL 63000 145670 31539
MEJIA TPS U 1-3 DVC THERMAL-COAL 63000 348298 31552
MEJIA TPS U 4 DVC THERMAL-COAL 21000 116099 34997
MEJIA TPS U 5-6 DVC THERMAL-COAL 50000 276427 35976
MEJIA TPS U 7-8 DVC THERMAL-COAL 100000 552854 36991
DURGAPUR STEEL TPS DVC THERMAL-COAL 100000 665550 39323
DURGAPUR TPS DVC THERMAL-COAL 21000 59270 35416
RAGHUNATHPUR TPS DVC THERMAL-COAL 120000 201650 35326
MAITHON HYDEL STA DVC HYDRO-HYDRO 6320 12200 17984
CHANDRAPURA TPSU1-3 DVC THERMAL-COAL 42000 257610 35095
CHANDRAPURA TPSU7-8 DVC THERMAL-COAL 50000 306673 34987
KODERMA TPS DVC THERMAL-COAL 100000 380180 38131
PANCHET HPS DVC HYDRO-HYDRO 8000 13360 17984
TILLAYA HPS DVC HYDRO-HYDRO 400 1410 17984
RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34700 35400
TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 277300 23200
TLDP -III NHPC LTD HYDRO-HYDRO 13200 55400 62000
TLDP -IV NHPC LTD HYDRO-HYDRO 16000 60300 25600
FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 957219 33700
FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 308943 41000
BONGAINGAON TPS NTPC LTD THERMAL-COAL 25000 153663 58600
KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 542277 34200
KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 942591 34200
BARH-II NTPC LTD THERMAL-COAL 132000 728021 44500
TALCHER TPS NTPC LTD THERMAL-COAL 46000 335521 30100
TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 702319 25600
TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1436521 24700
STATE SECTOR
BTPS(RampM) BIHAR STATE PGCL THERMAL-COAL 22000 12142 39700
BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 98331 10602
HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 50593 9482
CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 19689 2605
RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 53192 6033
UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 147208 14637
Page 40
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 60353 4519
IB TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 288567 25000
J P H GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 210 038 61100
MEYONG CHU GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 400 1086 61100
TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 122667 38200
DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 214339 43321
KOLAGHAT THERMAL POWER
STATION
WEST BENGAL PDCL THERMAL-COAL 126000 538269 31603
BAKRESHWAR THERMAL POWER
PLANT
WEST BENGAL PDCL THERMAL-COAL 105000 634876 32154
BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 45000 166855 33299
SANTHALDIH THERMAL POWER
STATION
WEST BENGAL PDCL THERMAL-COAL 50000 336442 34932
SAGARDIGHI THERMAL POWER
PROJECT
WEST BENGAL PDCL THERMAL-COAL 160000 423121 34705
JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 20344 68900
RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 24559 68900
TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 4623 68900
PURULIA PUMPED STORAGE
PROJECT
WEST BENGAL SEDCL HYDRO-HYDRO 90000 108816 68900
MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2768 68900
PRIVATE SECTOR
CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 49474 20230
CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 555500 70200
HALDIA ENERGY HALDIA ENERGY LTD THERMAL-COAL 60000 371000 50400
DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3688 63400
KAMALANGA TPS GMR KAMALANGA ENERGY LTD THERMAL-COAL 105000547670
33300
ADHUNIK POWER U-1 ADHUNIK POWER THERMAL-COAL 27000 158 44060
ADHUNIK POWER U-2 ADHUNIK POWER THERMAL-COAL 27000 168 44250
VL-JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 332800 23622
JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 43000 45250
JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 71700 37030
JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 70700 35920
JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 71100 38870
JOJOBERA UNIT 5 TATA POWER COM LTD THERMAL-COAL 12000 79300 44560
JOJOBERA UNIT 6 TATA POWER COM LTD THERMAL-WHR 12000 83700 12840
IEL KALINGANAGAR U-I TATA POWER COM LTD THERMAL-WG 6750 33400 22500
IEL KALINGANAGAR U-II TATA POWER COM LTD THERMAL-WG 6750 34800 22500
MAITHON UNIT 1 amp 2 TATA POWER COM LTD THERMAL-COAL 105000 678000 36100
HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 27500 24340
HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 28400 24340
HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 15800 24310
NORTH EASTERN REGION
CENTRAL SECTOR
LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 74100 36600
AGARTALA GT NEEPCO THERMAL-GAS 13500 88611 27210
ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 153111 32310
DOYANG HEP NEEPCO HYDRO-HYDRO 7500 25598 49801
KOPILI HEP NEEPCO HYDRO-HYDRO 20000 98186 11491
KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 19582 20237
KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 10310 17968
RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 124093 22945
TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 10100 17344 39000
STATE SECTOR
HYDRO POWER (122 Stns) ITANAGAR GOVT OF ARUNACHAL
PRADESHHYDRO-HYDRO 6971 6217270
24600
KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39514 17337
LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 82327 36810
NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 33318 48290
MYNTRIANG SHEP ST II ASSAM POWER GENCO HYDRO-HYDRO 300 567 35776
LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 9130 49200
LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 012 49200
DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 022 49200
TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 000 49200
UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 4990 16000
UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 6476 37000
UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 16494 14600
UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 3600 9556 15000
SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 758 8000
MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44070 44800
KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 154 41400
TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 091 41400
MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 411 41400
MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 394 41400
KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 760 41400
SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 3264 41400
LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 044 41400
BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 18953 28000
ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 43585 28200
GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 4080 11100
Note
LIG Lignite N Naptha WHR Waste Heat Recovery
Page 41
SN Contents Page
1 Capacity Addition Targets and Achievements in 12th Plan amp upto March2019 12
2 Capacity Addition Targets amp Achievements during Apr-2019 and Apr-19 to Apr-19 13
3 Installed Capacity in various Regions including their shares 14-19
Section B - Capacity Addition
(i) CAPACITY ADDTION TARGETS AND ACHIEVEMENTS IN THE 12TH PLAN Figures in MW
TARGET ACH TARGET ACH TARGET ACH TARGET ACH
CENTRAL 14878 15869 6004 2584 5300 2000 26182 20453
STATE 13922 22201 1608 2276 0 0 15530 24477
PRIVATE 43540 53661 3285 619 0 0 46825 54280
ALL INDIA 72340 91730 10897 5479 5300 2000 88537 99209
(ii) CAPACITY ADDITION TARGET AND ACHIEVEMENT FOR 2017-18 (IN MW)
THERMAL HYDRO NUCLEAR
TARGET ACH TARGET ACH TARGET ACH TARGET ACH
CENTRAL 4880 3170 800 390 500 6180 3560
STATE 3546 1760 300 200 0 3846 1960
PRIVATE 2940 3780 205 205 0 3145 3985
ALL INDIA 11366 8710 1305 795 500 0 13171 9505
(iii) CAPACITY ADDITION ACHIEVEMENT FOR 2018-19 (IN MW)
TARGET ACH TARGET ACH TARGET ACH TARGET ACH
CENTRAL 2760 1960 710 110 0 0 3470 2070
STATE 4506 2850 130 30 0 0 4636 2880
PRIVATE 0 972 0 0 0 0 0 972
ALL INDIA 7266 5782 840 140 0 0 8106 5922
12
SECTOR
SECTOR
TOTAL
TOTALNUCLEARHYDROTHERMAL
1 Capacity Addtion Targets and Achievements in the 12th Plan amp upto March2019
SECTORTHERMAL HYDRO NUCLEAR TOTAL
(MW)
Cummulative
Deviation
Target Achievement Target Achievement (+) (-)
Central 6040 500 0 500 0 -500
State 425615 660 0 660 0 -660
Private 0 0 0 0 0 0
Total 1029615 1160 0 1160 0 -1160
Central 600 0 0 0 0 0
State 21099 0 0 0 0 0
Private 379 0 0 0 0 0
Total 118999 0 0 0 0 0
Nuclear Central 700 0 0 0 0 0
Central 7340 500 0 500 0 -500
State 446714 660 0 660 0 -660
Private 379 0 0 0 0 0
Total 1218614 1160 0 1160 0 -1160
Electricity Generation (MU) Targets and Achievements for 2016-17
13
Hydro
All India
Capacity Addition TargetsAchievements during the Month of Apr-2019
Thermal
2 Capacity Addition Targets Achievements During Apr-2019
Schemes Sector
Target 2019-20
Apr-19 to Apr-19Apr-19
11
60
0 0
11
60
0 0 0 0
0
200
400
600
800
1000
1200
1400
Thermal Hydro Nuclear Total
MW
Targets and Achievement during 2019-20Target Achievement
0
200
400
600
800
1000
1200
Thermal Hydro Nuclear Total
1160
0 0
1160
0 0 00
MW
Target Achievement
Coal Lignite Gas Diesel Total
State 1634400 25000 287920 000 1947320 000 869755 69956 2887031
Private 2168083 108000 55800 000 2331883 000 251400 1312046 3895329
Central 1233537 25000 234406 000 1492943 162000 849622 37900 2542465
Sub Total 5036020 158000 578126 000 5772146 162000 1970777 1419902 9324825
State 2156000 104000 284982 000 2544982 000 544650 54789 3144421
Private 3474567 50000 467600 000 3992167 000 48100 2186476 6226743
Central 1650295 000 328067 000 1978362 184000 162000 66630 2390992
Sub Total 7280862 154000 1080649 000 8515511 184000 754750 2307894 11762155
State 1993250 000 79198 28788 2101236 000 1177483 58688 3337407
Private 1187450 25000 532210 27370 1772030 000 000 3749140 5521170
Central 1123502 289000 35958 000 1448460 332000 000 54190 1834650
Sub Total 4304202 314000 647366 56158 5321726 332000 1177483 3862018 10693227
State 624000 000 10000 000 634000 000 353792 27511 1015303
Private 638700 000 000 000 638700 000 39900 111637 790237
Central 1483664 000 000 000 1483664 000 100520 1000 1585184
Sub Total 2746364 000 10000 000 2756364 000 494212 140148 3390724
State 000 000 49771 3600 53371 000 42200 23325 118895
Private 000 000 2450 000 2450 000 000 6104 8554
Central 77002 000 125360 000 202362 000 100500 3000 305862
Sub Total 77002 000 177581 3600 258183 000 142700 32429 433311
State 000 000 000 4005 4005 000 000 525 4530
Private 000 000 000 000 000 000 000 738 738
Central 000 000 000 000 000 000 000 510 510
Sub Total 000 000 000 4005 4005 000 000 1773 5778
State 6407650 129000 711871 36393 7284913 000 2987880 234793 10507586
Private 7468800 183000 1058060 27370 8737230 000 339400 7366140 16442770
Central 5568000 314000 723791 000 6605791 678000 1212642 163230 8659663
Total 19444450 626000 2493722 63763 22627934 678000 4539922 7764163 35610019
Figures at decimal may not tally due to rounding off
Note -
(As per latest information available with MNRE)
Break up of RES all India as on 31032019 is given below (in MW)
459315 3562597 2818071 7764163
A 0 MW
B Apr 2019 0 MW
C
Apr 2019 0 MW
D Net Capacity Added during Apr 2019 A-B-C 0 MW
Sector wise breakup of RES capacity as shown is provisional
Share of installed capacity of BBMB Stations is included in state sector of partner states
BM PowerCogen Waste to Energy
910350 13830
Capacity Added during Apr 2019
Capacity Retired during
Capacity removed due to change
from Conventional to RES during
Islands
ALL INDIA
Abbreviation- SHP=Small Hydro Project (le 25 MW) BP=Biomass Power UampI=Urban amp Industrial Waste Power RES=Renewable Energy Sources
1 RES include SHP BP UampI Solar and Wind Energy Installed capacity in respect of RES (MNRE) as on 31032019
Small
Hydro PowerWind Power
Bio-PowerSolar Power
Total
Capacity
RES
(MNRE)
Northern Region
Western Region
Southern Region
Eastern Region
North Eastern
Region
ALL INDIA INSTALLED CAPACITY (IN MW) OF POWER STATIONS
(As on 30042019)
(UTILITIES)
Region Ownership Sector
Mode wise breakup
Grand TotalThermalNuclear Hydro
Coal Lignite Gas Diesel Total
State 13500 000 180040 000 193540 000 000 000 193540
Private 86922 000 10800 000 97722 000 000 17889 115611
Central 311272 000 20701 000 331973 10283 72309 000 414565
Sub-Total 411694 000 211541 000 623235 10283 72309 17889 723716
State 272000 000 15000 000 287000 000 110282 6930 404212
Private 408078 000 000 000 408078 000 20000 34512 462590
Central 129472 000 53561 000 183034 10094 66370181 500 259998
Sub-Total 809550 000 68561 000 878112 10094 196652 41942 1126799
State 000 000 000 000 000 000 69460 25661 95121
Private 000 000 000 000 000 000 99200 62668 161868
Central 18340 000 6201 000 24541 2895 122388 000 149824
Sub-Total 18340 000 6201 000 24541 2895 291048 88329 406813
State 000 000 17500 000 17500 000 123000 12903 153403
Private 000 000 000 000 000 000 000 6483 6483
Central 50639 000 12907 000 63547 6798 109188 000 179533
Sub-Total 50639 000 30407 000 81047 6798 232188 19386 339419
State 176000 000 15000 000 191000 000 259770 12780 463550
Private 511550 000 000 000 511550 000 28800 115462 655812
Central 85458 000 26401 000 111859 19681 92342 000 223882
Sub-Total 773008 000 41401 000 814409 19681 380912 128242 1343244
State 626000 25000 60380 000 711380 000 109618 2385 823383
Private 280200 108000 000 000 388200 000 10400 730181 1128781
Central 95625 25000 22110 000 142735 55674 73901 34400 306710
Sub-Total 1001825 158000 82490 000 1242315 55674 193919 766966 2258874
State 546900 000 000 000 546900 000 72410 2510 621820
Private 871433 000 000 000 871433 000 84200 288760 1244393
Central 379639 000 54949 000 434588 28948 180253 3000 646789
Sub-Total 1797972 000 54949 000 1852921 28948 336863 294270 2513002
State 000 000 000 000 000 000 125215 6787 132002
Private 9900 000 45000 000 54900 000 8800 52620 116320
Central 34324 000 6966 000 41290 3124 47554 000 91968
Sub-Total 44224 000 51966 000 96190 3124 181569 59407 340290
State 000 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 000 3471 3471
Central 3815 000 1503 000 5317 801 10171 000 16289
Sub-Total 3815 000 1503 000 5317 801 10171 3471 19760
124953 000 29105 000 154058 23703 75145 000 252907
State 1634400 25000 287920 000 1947320 000 869755 69956 2887031
Private 2168083 108000 55800 000 2331883 000 251400 1312046 3895329
Central 1233537 25000 234406 000 1492943 162000 849622 37900 2542465
Grand Total 5036020 158000 578126 000 5772146 162000 1970777 1419902 9324825
Delhi
Haryana
Himachal Pradesh
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
NORTHERN REGION
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
(As on 30042019)
State Ownership Sector
Mode wise breakup
Grand TotalThermalNuclear Hydro
RES
(MNRE)
Jammu amp Kashmir
Punjab
Rajasthan
Uttar Pradesh
Uttarakhand
Chandigarh
Central - Unallocated
Total (Northern
Region)
(As on 30042019)
Coal Lignite Gas Diesel Total
State 000 000 000 000 000 000 000 005 005
Private 000 000 4800 000 4800 000 000 392 5192
Central 46959 000 1967 000 48926 2600 000 000 51526
Sub-Total 46959 000 6767 000 53726 2600 000 397 56723
State 000 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 000 1447 1447
Central 14141 000 4334 000 18475 700 000 000 19175
Sub-Total 14141 000 4334 000 18475 700 000 1447 20622
State 371000 104000 217782 000 692782 000 77200 6470 776452
Private 726567 50000 396000 000 1172567 000 000 833180 2005747
Central 324243 000 42400 000 366643 55900 000 24330 446873
Sub-Total 1421810 154000 656182 000 2231992 55900 77200 863980 3229072
State 540000 000 000 000 540000 000 170366 8396 718762
Private 617400 000 10000 000 627400 000 000 418040 1045440
Central 334238 000 25700 000 359938 27300 152000 30000 569238
Sub-Total 1491638 000 35700 000 1527338 27300 322366 456436 2333440
State 228000 000 000 000 228000 000 12000 1105 241105
Private 885000 000 000 000 885000 000 000 52430 937430
Central 211075 000 000 000 211075 4800 10000 000 225875
Sub-Total 1324075 000 000 000 1324075 4800 22000 53535 1404410
State 1017000 000 67200 000 1084200 000 285084 38813 1408097
Private 1245600 000 56800 000 1302400 000 48100 880441 2230941
Central 466780 000 227273 000 694053 69000 000 12300 775353
Sub-Total 2729380 000 351273 000 3080653 69000 333184 931553 4414390
State 000 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 000 546 546
Central 19560 000 6634 000 26194 900 000 000 27094
Sub-Total 19560 000 6634 000 26194 900 000 546 27640
233300 000 19759 000 253059 22800 000 000 275859
State 2156000 104000 284982 000 2544982 000 544650 54789 3144421
Private 3474567 50000 467600 000 3992167 000 48100 2186476 6226743
Central 1650295 000 328067 000 1978362 184000 162000 66630 2390992
Grand Total 7280862 154000 1080649 000 8515511 184000 754750 2307894 11762155
Goa
Daman amp Diu
Gujarat
Madhya Pradesh
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
WESTERN REGION
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
ThermalNuclear Hydro
RES
(MNRE)
State Ownership Sector
Mode wise breakup
Grand Total
Chhattisgarh
Maharashtra
Dadra amp Nagar
Naveli
Central - Unallocated
Total (Western
Region)
(As on 30042019)
Coal Lignite Gas Diesel Total
State 501000 000 23540 000 524540 000 167360 5618 697518
Private 387388 000 381318 3680 772386 000 000 743342 1515728
Central 154683 12773 000 000 167456 12727 000 25000 205183
Sub-Total 1043071 12773 404858 3680 1464382 12727 167360 773960 2418429
State 558250 000 000 000 558250 000 247993 4122 810365
Private 83945 000 83182 000 167127 000 000 393644 560771
Central 180685 14927 000 000 195612 14873 000 1000 211485
Sub-Total 822880 14927 83182 000 920989 14873 247993 398766 1582621
State 502000 000 000 12792 514792 000 358660 19389 892841
Private 195850 000 000 2520 198370 000 000 1363591 1561961
Central 242780 40140 000 000 282920 69800 000 000 352720
Sub-Total 940630 40140 000 15312 996082 69800 358660 1382979 2807521
State 000 000 000 15996 15996 000 185650 17290 218936
Private 61500 000 17400 000 78900 000 000 19021 97921
Central 86142 28180 35958 000 150280 36200 000 5000 191480
Sub-Total 147642 28180 53358 15996 245176 36200 185650 41311 508337
State 432000 000 52408 000 484408 000 217820 12270 714498
Private 458767 25000 50310 21170 555247 000 000 1229228 1784475
Central 302532 136420 000 000 438952 144800 000 23190 606942
Sub-Total 1193299 161420 102718 21170 1478607 144800 217820 1264688 3105915
State 000 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 000 000 000
Central 000 10000 000 000 10000 000 000 000 10000
Sub-Total 000 10000 000 000 10000 000 000 000 10000
State 000 000 3250 000 3250 000 000 000 3250
Private 000 000 000 000 000 000 000 314 314
Central 14080 10760 000 000 24840 8600 000 000 33440
Sub-Total 14080 10760 3250 000 28090 8600 000 314 37004
142600 35800 000 000 178400 45000 000 000 223400
State 1993250 000 79198 28788 2101236 000 1177483 58688 3337407
Private 1187450 25000 532210 27370 1772030 000 000 3749140 5521170
Central 1123502 289000 35958 000 1448460 332000 000 54190 1834650
Grand Total 4304202 314000 647366 56158 5321726 332000 1177483 3862018 10693227
Kerala
Andhra Pradesh
Telangana
Karnataka
Total (Southern
Region)
Tamil Nadu
NLC
Puducherry
Central - Unallocated
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
SOUTHERN REGION
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
State Ownership Sector
Mode wise breakup
Grand TotalThermalNuclear Hydro
RES
(MNRE)
(As on 30042019)
Coal Lignite Gas Diesel Total
State 000 000 000 000 000 000 000 7070 7070
Private 28100 000 000 000 28100 000 000 25545 53645
Central 384933 000 000 000 384933 000 11000 000 395932
Sub-Total 413033 000 000 000 413033 000 11000 32615 456647
State 42000 000 000 000 42000 000 13000 405 55405
Private 73000 000 000 000 73000 000 000 3495 76495
Central 39374 000 000 000 39374 000 6100 000 45474
Sub-Total 154374 000 000 000 154374 000 19100 3900 177374
State 540000 000 10000 000 550000 000 98600 12195 660795
Private 243700 000 000 000 243700 000 000 35250 278950
Central 76077 000 000 000 76077 000 41000 000 117077
Sub-Total 859777 000 10000 000 869777 000 139600 47445 1056822
State 000 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 000 000 000
Central 698504 000 000 000 698504 000 18620 000 717124
Sub-Total 698504 000 000 000 698504 000 18620 000 717124
State 42000 000 000 000 42000 000 206192 2630 250822
Private 293900 000 000 000 293900 000 000 47346 341246
Central 163390 000 000 000 163390 000 8900 1000 173290
Sub-Total 499290 000 000 000 499290 000 215092 50976 765358
State 000 000 000 000 000 000 36000 5211 41211
Private 000 000 000 000 000 000 39900 001 39901
Central 8703 000 000 000 8703 000 6400 000 15103
Sub-Total 8703 000 000 000 8703 000 82300 5212 96215
112683 000 000 000 112683 000 8501 000 121184
State 624000 000 10000 000 634000 000 353792 27511 1015303
Private 638700 000 000 000 638700 000 39900 111637 790237
Central 1483664 000 000 000 1483664 000 100520 1000 1585184
Grand Total 2746364 000 10000 000 2756364 000 494212 140148 3390724
Total (Eastern
Region)
Bihar
Jharkhand
West Bengal
DVC
Odisha
Sikkim
Central - Unallocated
HydroOwnership Sector
Mode wise breakup
Grand TotalThermalNuclear
RES
(MNRE)
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
State
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
EASTERN REGION
(As on 30042019)
Coal Lignite Gas Diesel Total
State 000 000 32821 000 32821 000 10000 501 43322
Private 000 000 2450 000 2450 000 000 2650 5100
Central 40852 000 43556 000 84408 000 35708 2500 122616
Sub-Total 40852 000 78827 000 119679 000 45708 5651 171038
State 000 000 000 000 000 000 000 10711 10711
Private 000 000 000 000 000 000 000 2939 2939
Central 3705 000 4682 000 8387 000 11655 000 20042
Sub-Total 3705 000 4682 000 8387 000 11655 13650 33692
State 000 000 000 000 000 000 32200 3253 35453
Private 000 000 000 000 000 000 000 012 012
Central 4560 000 10969 000 15529 000 7227 000 22756
Sub-Total 4560 000 10969 000 15529 000 39427 3265 58221
State 000 000 16950 000 16950 000 000 1601 18551
Private 000 000 000 000 000 000 000 009 009
Central 5610 000 43695 000 49305 000 6849 500 56654
Sub-Total 5610 000 60645 000 66255 000 6849 2110 75214
State 000 000 000 3600 3600 000 000 545 4145
Private 000 000 000 000 000 000 000 344 344
Central 4710 000 7157 000 11867 000 9534 000 21401
Sub-Total 4710 000 7157 3600 15467 000 9534 889 25890
State 000 000 000 000 000 000 000 3067 3067
Private 000 000 000 000 000 000 000 100 100
Central 3210 000 4893 000 8103 000 5733 000 13836
Sub-Total 3210 000 4893 000 8103 000 5733 3167 17003
State 000 000 000 000 000 000 000 3647 3647
Private 000 000 000 000 000 000 000 050 050
Central 3105 000 4046 000 7151 000 9794 000 16945
Sub-Total 3105 000 4046 000 7151 000 9794 3697 20642
11250 000 6362 000 17612 000 14000 000 31612
State 000 000 49771 3600 53371 000 42200 23325 118895
Private 000 000 2450 000 2450 000 000 6104 8554
Central 77002 000 125360 000 202362 000 100500 3000 305862
Grand Total 77002 000 177581 3600 258183 000 142700 32429 433311
Assam
Arunachal Pradesh
Meghalaya
Tripura
Manipur
Nagaland
Mizoram
Central - Unallocated
Total (North-
Eastern Region)
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
NORTH-EASTERN REGION
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
State Ownership Sector
Mode wise breakup
Grand TotalThermalNuclear Hydro
RES
(MNRE)
(As on 30042019)
Coal Lignite Gas Diesel Total
State 000 000 000 4005 4005 000 000 525 4530
Private 000 000 000 000 000 000 000 663 663
Central 000 000 000 000 000 000 000 510 510
Sub-Total 000 000 000 4005 4005 000 000 1698 5703
State 000 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 000 075 075
Central 000 000 000 000 000 000 000 000 000
Sub-Total 000 000 000 000 000 000 000 075 075
State 000 000 000 4005 4005 000 000 525 4530
Private 000 000 000 000 000 000 000 738 738
Central 000 000 000 000 000 000 000 510 510
Grand Total 000 000 000 4005 4005 000 000 1773 5778
Andaman amp
Nicobar
Lakshadweep
Total (Islands)
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
ISLANDS
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
State Ownership Sector
Mode wise breakup
Grand TotalThermalNuclear Hydro
RES
(MNRE)
SrNo Contents Page
1 Executive summary of Target and Achievement of Transmission Lines during 2019-20
20(1)
2 List of Transmission Lines CommissionedReady for commissioning during Apr-2019 20(2)
Section C - Transmission Lines
1 Executive summary of Target and Achievement of Transmission Lines during 2019-20 As on 30-04-19
(All figures in circuit kms)
Ce
ntr
al S
ecto
r
Sta
te S
ecto
r
JV
Pri
va
te S
ecto
r
To
tal
Ce
ntr
al S
ecto
r
Sta
te S
ecto
r
JV
Pri
va
te S
ecto
r
To
tal
Ce
ntr
al S
ecto
r
Sta
te S
ecto
r
JV
Pri
va
te S
ecto
r
To
tal
Ce
ntr
al S
ecto
r
Sta
te S
ecto
r
JV
Pri
va
te S
ecto
r
To
tal
Ce
ntr
al S
ecto
r
Sta
te S
ecto
r
JV
Pri
va
te S
ecto
r
To
tal
Ce
ntr
al
Se
cto
r
Sta
te S
ec
tor
JV
Pri
va
te S
ec
tor
Gra
nd
To
tal
0 0 0 0 0 0 0 0 2727 958 2334 6019 2239 3416 1143 6798 781 10023 0 10804 5747 14397 3477 23621
Apr19 Programme 0 0 0 0 0 0 0 0 577 416 557 1550 60 890 203 1153 0 309 0 309 637 1615 760 3012
Achievement 0 0 0 0 0 0 0 0 53 0 0 53 0 20 0 20 0 401 0 401 53 421 0 474
Upto Apr-19 Programme 0 0 0 0 0 0 0 0 577 416 557 1550 60 890 203 1153 0 309 0 309 637 1615 760 3012
Achievement 0 0 0 0 0 0 0 0 53 0 0 53 0 20 0 20 0 401 0 401 53 421 0 474
20(1)
220 kV Grand Total 800 kV 500 kV
Programme 2019-20
Programme
Achievement
HVDC765 kV 400 kV
Line
1 2 3 4 5 6
1 400 Bhadla (PG) - Bhadla (RVPN) line DC PGCIL 53
53
2 400 LILO of one ckt Jhanor - Navsari at Vav Ss DC GETCO 20
3 220 Banda-Chitrakoot Line DC UPPTCL 226
4 220 Gorakhpur (PG)-Gola line DC UPPTCL 82
5 220 Hapur(765) - Faridnagar line SC UPPTCL 11
6 220 Kalikiri - Madanapalli line DC APTRANSCO 60
7 220LILO of Gr Noida -Noida Sec-129 at Noida
Sec-148DC UPPTCL 1
8 220LILO of one Ckt of Badshahpur Pali at Sec-
65 GurgaonDC HVPNL 3
9 220 Sultanpur-Sangipur LILO Section at Amethi DC UPPTCL 18
421
0
474
20(2)
Grand Total
2Transmission Lines (220 kV and above) CommissionedReady for commissioning During Apr-2019
Voltage
Level (kV)Name of Transmission Lines
Circuit
Type
Executing
Agency
CENTRAL SECTOR
Total of CENTRAL SECTOR
STATE SECTOR Sector
Total of STATE SECTOR
PRIVATE SECTOR
Total of PRIVATE SECTOR
SlNo
Length(CKm)
As on 30-04-19
SN Contents Page
1 Executive summary of Target and Achievement of Substations during 2019-20 21(1)
2Sub Stations (220 kV and above) commissionedready for commisssioning during Apr-
201921(2)
Section D - Sub Stations
1 Executive summary of Target and Achievement of Substations during 2019-2020 As on 30-04-19
(All figures in circuit MVA)
Ce
ntr
al S
ecto
r
Sta
te S
ecto
r
JV
Pri
va
te S
ecto
r
To
tal
Ce
ntr
al S
ecto
r
Sta
te S
ecto
r
JV
Pri
va
te S
ecto
r
To
tal
Ce
ntr
al S
ecto
r
Sta
te S
ecto
r
JV
Pri
va
te S
ecto
r
To
tal
Ce
ntr
al S
ecto
r
Sta
te S
ecto
r
JV
Pri
va
te S
ecto
r
To
tal
Ce
ntr
al S
ecto
r
Sta
te S
ecto
r
JV
Pri
va
te S
ecto
r
To
tal
Ce
ntr
al S
ec
tor
Sta
te S
ec
tor
JV
Pri
va
te S
ec
tor
Gra
nd
To
tal
3000 0 0 3000 0 0 0 0 18000 3000 6000 27000 5205 19665 4260 29130 800 21786 0 22586 27005 44451 10260 81716
Apr19 Programme 0 0 0 0 0 0 0 0 3000 0 3000 6000 0 1000 2000 3000 0 800 0 800 3000 1800 5000 9800
Achievement 0 0 0 0 0 0 0 0 500 0 0 500 815 1980 0 2795 0 1305 0 1305 1315 3285 0 4600
Upto Apr-19 Programme 0 0 0 0 0 0 0 0 3000 0 3000 6000 0 1000 2000 3000 0 800 0 800 3000 1800 5000 9800
Achievement 0 0 0 0 0 0 0 0 500 0 0 500 815 1980 0 2795 0 1305 0 1305 1315 3285 0 4600
21(1)
220 kV Grand Total 800 kV 500 kV
Programme 2019-20
Programme
Achievement
HVDC765 kV 400 kV
As on 30-04-19
Sl Voltage Ratio Capacity
No (kVkV) (MWMVA)
1 2 3 4 5
1 Bhadla SS (3x1500 3x500 MVA) 765400 PGCIL 500
2 Extn at Tumkur (Pavagada ) PS (2x500 MVA) 400220 PGCIL 500
3 Bongaigaon (2nd ICT) Ss 400220 PGCIL 315
Total of CENTRAL SECTOR 1315
4 Motiram Adda Gorakhpur (Aug) (Additional TF) 400220 UPPTCL 240
5 Muradnagar-II Ghaziabad (Aug) (Additional TF) 400220 UPPTCL 240
6 Noida Sec- 148 GBNagar (New) 400220 UPPTCL 5007 Sarnath Varanasi (Aug) TF- II (500-315) 400220 UPPTCL 1858 Sarojininagar Lucknow Aug) TF- II (500-315) 400220 UPPTCL 185
9 Unnao (Aug) TF-III 400220 UPPTCL 31510 Nawada SS 400220 HVPNL 31511 Kharepatan SS 22033 MSETCL 2512 Prathipadu SS 220132 APTRANSCO 10013 Pali Ss 22066 HVPNL 160
14 A-5 Faridabad Ss 22066 HVPNL 60
15 Rentachintala Ss Aug(3X100-2x100) 220132 APTRANSCO 10016 Amethi Ss 220132 UPPTCL 160
17 Gajokhar Varanasi (Aug) TF- II (160-100) 220132 UPPTCL 60
18 Gola Gorakhpur (New) 220132 UPPTCL 160
19 Khurja Bulandshahr (Aug) TF- II (200-160) 220132 UPPTCL 40
20 RC Green GB Nagar (Aug) TF-II (160-100) 220132 UPPTCL 60
21 Sikandrabad Bulandshahr (Aug) (Additional TF) 220132 UPPTCL 160
22 Sitapur (Aug) (Additional TF) 220132 UPPTCL 160
23 Sohawal Ayodhya (Aug) TF-II (160-100) 220132 UPPTCL 60
TOTAL STATE SECTOR 3285
GRAND TOTAL 4600
21(2)
CENTRAL SECTOR
STATE SECTOR
2Sub-Stations (220 kV and above) CommissionedReady for commissioning During Apr-2019
Name of Sub Stations Executing Agency
SN Contents Page
1 Electricity Generation (MU) Targets and Achievements for 2019-20 22
Section E - Electricity Generation
Programme Achievement Ach Programme Achievement Ach
Central Sector 37545100 3177900 3129530 9848 3177900 3129530 9848
State Sector 37498600 3322500 2950558 8881 3322500 2950558 8881
PvtIPP Sector 37346200 3236400 3195940 9875 3236400 3195940 9875
PvtUTL Sector 1823100 159300 165579 10394 159300 165579 10394
Total 114213000 9896100 9441607 9541 9896100 9441607 9541
Central Sector 5661700 386100 481390 12468 386100 481390 12468
State Sector 6680500 498200 536514 10769 498200 536514 10769
PvtIPP Sector 1206900 57300 80405 14032 57300 80405 14032
PvtUTL Sector 144100 12300 10930 8886 12300 10930 8886
Total 13693200 953900 1109239 11628 953900 1109239 11628
Central Sector 4472000 367300 317765 8651 367300 317765 8651
Total 4472000 367300 317765 8651 367300 317765 8651
Bhutan Import 621800 17500 24396 13941 17500 24396 13941
Central Sector 47678800 3931300 3928685 9993 3931300 3928685 9993
State Sector 44179100 3820700 3487072 9127 3820700 3487072 9127
Pvt Sector 40520300 3465300 3452854 9964 3465300 3452854 9964
Total 133000000 11234800 10893007 9696 11234800 10893007 9696
Provisional based on actual-cum-Assesment
Figs in MU
Cummulative
Achievement
Cummulative
Achievement
Mar-19 Mar-18 Upto Mar-2019 Upto Mar-2018
984785 869291 12675910 10183949
22
1 Electricity Generation (MU) Targets and Achievememts for 2019-20
All India Energy Generation During Apr-19 to Apr-19 (MU)
Target (2019-20)Apr-19 to Apr-19
Sector
Hydro
Thermal
Nuclear
Renewable Energy Generation
Achievement
Apr-2019
98961
95393673
112348
94416
11092
3178
108930
0
20000
40000
60000
80000
100000
120000
Thermal Hydro Nuclear Total
Programme
Achievement
SN Contents Page
1 Energy Power Supply Position (Provisional) for Apr-2019 and during Apr-19 to Apr-19 23
2 Peak Power Supply Position (Provisional) for Apr-2019 and during Apr-19 to Apr-19 24
3 Energy Power Supply Position (Revised) for Mar-2019 and during Apr-19 to Mar-19 25
4 Peak Power Supply Position (Revised) for Mar-2019 and during Apr-19 to Mar-19 26
5 Notified Power cuts Restrictions on Industries during Apr-2019 27
6 Power Supply to Agricultural Sector during Apr-2019 28
Section F - Power supply position
आकड़ मममलयन यननट नट Figures in MU net
ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied
कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )
चडीगढ़ Chandigarh 117 117 0 00 117 117 0 00
दिलली Delhi 2698 2698 1 00 2698 2698 1 00
हरियजणज Haryana 3773 3773 0 00 3773 3773 0 00
दहमजचल परिश Himachal Pradesh 777 777 0 00 777 777 0 00
रमम कशमीि Jammu amp Kashmir 1604 1296 308 192 1604 1296 308 192
परजब Punjab 3646 3646 0 00 3646 3646 0 00
िजरसथजन Rajasthan 6210 6208 2 00 6210 6208 2 00
उतति परिश Uttar Pradesh 10179 10148 32 03 10179 10148 32 03
उततिजखड Uttarakhand 1120 1120 0 00 1120 1120 0 00
उततरी कषतर Northern Region 30094 29786 308 10 30094 29786 308 10
छततीसगढ़ Chhattisgarh 2684 2676 8 03 2684 2676 8 03
गरिजत Gujarat 10718 10718 0 00 10718 10718 0 00
मधय परिश Madhya Pradesh 6006 6006 0 00 6006 6006 0 00
महजिजषटर Maharashtra 14308 14308 0 00 14308 14308 0 00
िमन औि दिउ Daman amp Diu 220 220 0 00 220 220 0 00
िजिि व नगि हवली Dadra amp Nagar Haveli 552 552 0 00 552 552 0 00
गोवज Goa 388 388 0 00 388 388 0 00
पशचिमी कषतर Western Region 34875 34868 8 00 34875 34868 8 00
आनधर परिश Andhra Pradesh 5708 5708 0 00 5708 5708 0 00
तलगजनज Telangana 5725 5725 0 00 5725 5725 0 00
कनजाटक Karnataka 7003 7003 0 00 7003 7003 0 00
किल Kerala 2402 2400 2 01 2402 2400 2 01
तममल नजड Tamil Nadu 10010 10010 0 00 10010 10010 0 00
पडचिी Puducherry 263 263 0 00 263 263 0 00
लकष-दवीप Lakshadweep 4 4 0 0 4 4 0 0
दकषकषणी कषतर Southern Region 31111 31109 2 00 31111 31109 2 00
बबहजि Bihar 2589 2589 0 00 2589 2589 0 00
िजमोिि घजटी ननगम DVC 1772 1772 0 00 1772 1772 0 00
झजिखणड Jharkhand 689 689 0 00 689 689 0 00
ओडडशज Odisha 2689 2689 1 00 2689 2689 1 00
पशशचम बगजल West Bengal 5075 5075 0 00 5075 5075 0 00
मसशककम Sikkim 37 37 0 00 37 37 0 00
अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 7 29 27 2 7
परवी कषतर Eastern Region 12851 12850 1 00 12851 12850 1 00
अरणजचल परिश Arunachal Pradesh 66 66 0 05 66 66 0 05
असम Assam 766 709 57 75 766 709 57 75
मणणपि Manipur 68 67 1 15 68 67 1 15
मघजलय Meghalaya 170 160 10 59 170 160 10 59
ममज़ोिम Mizoram 54 53 0 08 54 53 0 08
नजगजलड Nagaland 54 54 0 08 54 54 0 08
बिपिज Tripura 122 120 1 12 122 120 1 12
उततर-परवी कषतर North-Eastern Region 1300 1228 71 55 1300 1228 71 55
समपणण भारत All India 110231 109842 389 04 110231 109842 389 04
23
ऊरजा पनत ा म कमी ऊरजा पनत ा म कमीEnergy not Supplied
Excludes energy exported to Bangladesh
Energy not Supplied
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
ऊराण वरवदयत आपरत ण शथिरत ररपोरण (परवाणरवलोकन) Energy Power Supply Position Report (Provisional)
राजयState
अपरल 2019 April2019 अपरल2019 -अपरल2019 April2019 to April2019
अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met
कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )
चडीगढ़ Chandigarh 256 256 0 00 256 256 0 00
दिलली Delhi 5664 5664 0 00 5664 5664 0 00
हरियजणज Haryana 8127 8127 0 00 8127 8127 0 00
दहमजचल परिश Himachal Pradesh 1387 1387 0 00 1387 1387 0 00
रमम कशमीि Jammu amp Kashmir 2826 2261 565 200 2826 2261 565 200
परजब Punjab 7015 7015 0 00 7015 7015 0 00
िजरसथजन Rajasthan 10560 10560 0 00 10560 10560 0 00
उतति परिश Uttar Pradesh 19935 19935 0 00 19935 19935 0 00
उततिजखड Uttarakhand 1922 1922 0 00 1922 1922 0 00
उततरी कषतर Northern Region 54476 53985 491 09 54476 53985 491 09
छततीसगढ़ Chhattisgarh 4596 4574 22 05 4596 4574 22 05
गरिजत Gujarat 17871 17865 6 00 17871 17865 6 00
मधय परिश Madhya Pradesh 10018 10018 0 00 10018 10018 0 00
महजिजषटर Maharashtra 23158 23150 8 00 23158 23150 8 00
िमन औि दिउ Daman amp Diu 341 340 1 02 341 340 1 02
िजिि व नगि हवली Dadra amp Nagar Haveli 818 818 0 00 818 818 0 00
गोवज Goa 594 594 0 00 594 594 0 00
पशचिमी कषतर Western Region 56242 56222 20 00 56242 56222 20 00
आनधर परिश Andhra Pradesh 9151 9151 0 00 9151 9151 0 00
तलगजनज Telangana 10191 10191 0 00 10191 10191 0 00
कनजाटक Karnataka 12681 12681 0 00 12681 12681 0 00
किल Kerala 4309 4300 8 02 4309 4300 8 02
तममल नजड Tamil Nadu 15972 15972 0 00 15972 15972 0 00
पडचिी Puducherry 482 480 2 05 482 480 2 05
लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0
दकषकषणी कषतर Southern Region 49155 49103 52 01 49155 49103 52 01
बबहजि Bihar 5357 5357 0 00 5357 5357 0 00
िजमोिि घजटी ननगम DVC 3039 3039 0 00 3039 3039 0 00
झजिखणड Jharkhand 1266 1266 0 00 1266 1266 0 00
ओडडशज Odisha 5389 5389 0 00 5389 5389 0 00
पशशचम बगजल West Bengal 8666 8666 0 00 8666 8666 0 00
मसशककम Sikkim 100 100 0 00 100 100 0 00
अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7
परवी कषतर Eastern Region 23349 23349 0 00 23349 23349 0 00
अरणजचल परिश Arunachal Pradesh 139 136 3 22 139 136 3 22
असम Assam 1712 1667 45 26 1712 1667 45 26
मणणपि Manipur 197 188 9 46 197 188 9 46
मघजलय Meghalaya 336 336 0 00 336 336 0 00
ममज़ोिम Mizoram 116 113 3 26 116 113 3 26
नजगजलड Nagaland 157 131 26 166 157 131 26 166
बिपिज Tripura 292 291 1 03 292 291 1 03
उततर-परवी कषतर North-Eastern Region 2848 2780 68 24 2848 2780 68 24
समपणण भारत All India 177411 176810 601 03 177411 176810 601 03
24
मजग की पनत ा म कमी Demand not Met
Excludes the supply to Bangladesh
राजयStateअपरल 2019 April2019
मजग की पनत ा म कमी Demand not Met
अधिकतम वरवदयत आपरत ण शथिरत ररपोरण (परवाणरवलोकन) Peak Power Supply Position Report (Provisional)
आकड़ मगज वजट नट Figures in MW netअपरल2019 -अपरल2019 April2019 to April2019
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
आकड़ मममलयन यननट नट Figures in MU net
ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied
कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )
चडीगढ़ Chandigarh 96 96 0 00 1561 1561 0 00
दिलली Delhi 1931 1930 1 00 32299 32282 17 01
हरियजणज Haryana 3658 3658 0 00 53665 53665 0 00
दहमजचल परिश Himachal Pradesh 832 830 2 02 9850 9618 232 24
रमम कशमीि Jammu amp Kashmir 1767 1414 353 200 19593 15868 3725 190
परजब Punjab 3585 3585 0 00 55288 55275 13 00
िजरसथजन Rajasthan 6774 6770 4 01 79826 79637 189 02
उतति परिश Uttar Pradesh 8754 8691 63 07 117101 116118 984 08
उततिजखड Uttarakhand 1067 1067 0 00 13845 13753 92 07
उततरी कषतर Northern Region 28464 28041 423 15 383028 377776 5251 14
छततीसगढ़ Chhattisgarh 2464 2457 8 03 26130 26076 54 02
गरिजत Gujarat 9890 9890 0 00 116588 116572 15 00
मधय परिश Madhya Pradesh 6236 6236 0 00 75667 75665 2 00
महजिजषटर Maharashtra 13631 13631 0 00 158285 158148 137 01
िमन औि दिउ Daman amp Diu 221 221 0 00 2557 2557 0 00
िजिि व नगि हवली Dadra amp Nagar Haveli 553 553 0 00 6317 6317 0 00
गोवज Goa 362 362 0 00 4283 4280 3 01
पशचिमी कषतर Western Region 33357 33349 8 00 389827 389615 212 01
आनधर परिश Andhra Pradesh 6072 6071 1 00 63735 63677 58 01
तलगजनज Telangana 6930 6929 1 00 66697 66635 62 01
कनजाटक Karnataka 7614 7612 1 00 71759 71690 69 01
किल Kerala 2489 2488 1 00 25029 24911 118 05
तममल नजड Tamil Nadu 10247 10245 2 00 109375 109273 102 01
पडचिी Puducherry 252 251 1 04 2761 2751 10 03
लकष-दवीप Lakshadweep 4 4 0 0 46 46 0 0
दकषकषणी कषतर Southern Region 33605 33597 8 00 339355 338938 417 01
बबहजि Bihar 2319 2318 1 00 30052 29827 225 07
िजमोिि घजटी ननगम DVC 1773 1772 1 00 22365 21995 369 17
झजिखणड Jharkhand 698 697 1 01 8682 8461 221 25
ओडडशज Odisha 2583 2582 1 00 31810 31781 30 01
पशशचम बगजल West Bengal 4585 4584 2 00 52237 52078 159 03
मसशककम Sikkim 41 41 0 00 513 512 0 01
अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 67 346 323 23 67
परवी कषतर Eastern Region 11999 11995 5 00 145658 144654 1004 07
अरणजचल परिश Arunachal Pradesh 61 60 0 06 864 855 9 10
असम Assam 680 656 23 34 9532 9204 328 34
मणणपि Manipur 68 68 1 09 916 906 10 11
मघजलय Meghalaya 173 173 0 03 1955 1953 1 01
ममज़ोिम Mizoram 50 49 0 09 668 661 8 12
नजगजलड Nagaland 58 57 1 20 902 809 93 103
बिपिज Tripura 150 150 0 00 1859 1837 21 11
उततर-परवी कषतर North-Eastern Region 1240 1214 26 21 16696 16225 471 28
समपणण भारत All India 108665 108196 469 04 1274564 1267209 7355 06
Note The revised data for March 2019 is not avaliable
Excludes energy exported to Bangladesh
राजयState
ऊराण वरवदयत आपरत ण शथिरत ररपोरण (परवाणरवलोकन) Energy Power Supply Position Report (Provisional)
25
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
Energy not Supplied Energy not Supplied
मािण2019 March2019 अपरल2018 -मािण2019 April2018 to March2019
ऊरजा पनत ा म कमी ऊरजा पनत ा म कमी
अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met
कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )
चडीगढ़ Chandigarh 223 223 0 00 369 369 0 00
दिलली Delhi 4016 4016 0 00 7016 7016 0 00
हरियजणज Haryana 6544 6544 0 00 10270 10270 0 00
दहमजचल परिश Himachal Pradesh 1683 1683 0 00 1700 1700 0 00
रमम कशमीि Jammu amp Kashmir 3277 2622 655 200 3277 2622 655 200
परजब Punjab 6564 6564 0 00 12638 12638 0 00
िजरसथजन Rajasthan 11885 11885 0 00 13276 13276 0 00
उतति परिश Uttar Pradesh 16220 16220 0 00 20498 20062 436 21
उततिजखड Uttarakhand 2002 2002 0 00 2216 2216 0 00
उततरी कषतर Northern Region 47925 47356 569 12 63166 61726 1440 23
छततीसगढ़ Chhattisgarh 4444 4128 316 71 4444 4270 174 39
गरिजत Gujarat 16263 16263 0 00 17053 16963 90 05
मधय परिश Madhya Pradesh 12328 12323 5 00 13815 13815 0 00
महजिजषटर Maharashtra 22361 22291 70 03 23864 23254 610 26
िमन औि दिउ Daman amp Diu 336 336 0 01 357 356 1 02
िजिि व नगि हवली Dadra amp Nagar Haveli 800 799 1 01 816 815 1 01
गोवज Goa 538 538 0 00 596 596 0 00
पशचिमी कषतर Western Region 53132 52965 167 03 56675 55821 853 15
आनधर परिश Andhra Pradesh 8977 8977 0 00 9459 9453 6 01
तलगजनज Telangana 10471 10471 0 00 10815 10815 0 00
कनजाटक Karnataka 12841 12841 0 00 12841 12841 0 00
किल Kerala 4264 4228 36 09 4264 4228 36 09
तममल नजड Tamil Nadu 15712 15712 0 00 15712 15712 0 00
पडचिी Puducherry 427 412 15 34 427 412 15 34
लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0
दकषकषणी कषतर Southern Region 49464 49464 0 00 49464 49464 0 00
बबहजि Bihar 4633 4633 0 00 5115 5084 31 06
िजमोिि घजटी ननगम DVC 3035 3035 0 00 3035 3035 0 00
झजिखणड Jharkhand 1210 1210 0 00 1339 1291 48 36
ओडडशज Odisha 4827 4827 0 00 5357 5357 0 00
पशशचम बगजल West Bengal 8287 8287 0 00 9130 9123 7 01
मसशककम Sikkim 100 100 0 00 106 106 0 00
अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7
परवी कषतर Eastern Region 21658 21658 0 00 23141 22733 408 18
अरणजचल परिश Arunachal Pradesh 133 131 2 15 138 138 0 01
असम Assam 1539 1508 31 20 1865 1809 56 30
मणणपि Manipur 204 199 5 25 219 216 3 12
मघजलय Meghalaya 357 357 0 00 374 372 1 04
ममज़ोिम Mizoram 108 105 3 28 121 119 2 17
नजगजलड Nagaland 127 125 2 16 156 138 18 116
बिपिज Tripura 249 249 0 00 298 293 5 17
उततर-परवी कषतर North-Eastern Region 2540 2535 5 02 2967 2850 117 39
समपणण भारत All India 169464 168745 719 04 177022 175528 1494 08
Note The revised data for March 2019 is not avaliable 26
अधिकतम वरवदयत आपरत ण शथिरत ररपोरण (परवाणरवलोकन) Peak Power Supply Position Report (Provisional)
आकड़ मगज वजट नट Figures in MW net
राजयStateमािण2019 March2019 अपरल2018 -मािण2019 April2018 to March2019
मजग की पनत ा म कमी मजग की पनत ा म कमी Demand not MetDemand not Met
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
Excludes the supply to Bangladesh
अपरल 2019 April2019 अपरल2018 -मािण2019 April2019 to April2019
उततरी कषतर Northern Region
चडीगढ़ Chandigarh(Data Not Received)दिलली Delhi
हरियजणज Haryana
दहमजचल परिश Himachal Pradeshरमम कशमीि Jammu amp Kashmir(Data
Not Received)परजब Punjab
िजरसथजन Rajasthanउतति परिश Uttar Pradesh
उततिजखड Uttarakhand
पशचिमी कषतर Western Region
छततीसगढ़ Chhattisgarh
Apr-Nov 2018- No cuts
Maximum Demand cut-58MW
Energy cut- 00020-00032 MUsday
गरिजत Gujarat
मधय परिश Madhya Pradesh
महजिजषटर Maharashtra
गोवज Goa
दकषकषणी कषतर Southern Region
आनधर परिश Andhra Pradesh
तलगजनज Telangana
कनजाटक Karnataka
किल Kerala
तममल नजड Tamil Nadu
पडचिी Puducherryपरवी कषतर Eastern Region
बबहजि Bihar
झजिखणड Jharkhand
ओडडशज Odisha
पशशचम बगजल West Bengal
No N
otifie
d Cu
ts
27
मािण 2019 म इडथरीर पर वरवदयत करौती का वरवरवरण Notified Power CutsRestrictions on Industries during April2019
राजय कषतर State Regionऊराणमाग करौती EnergyDemand Cut
No N
otifie
d Cu
tsNo
Notifie
d Cu
ts
अपरल2019 April 2019 अपरल2019 -अपरल2019 April2019 to April2019
उततरी कषतर Northern Region
चडीगढ़ Chandigarh Data not received Data not received
दिलली Delhi Data not received Data not received
हरियजणज Haryana 0811 hrsday 0811 hrsday
दहमजचल परिश Himachal Pradesh HPSEBL has only 2 agriculture consumers and uninterrupted
power is being supplied to agriculture sector
HPSEBL has only 2 agriculture consumers and uninterrupted
power is being supplied to agriculture sector
रमम कशमीि Jammu amp Kashmir Data not received Data not received
परजब Punjab 379 hrsday 379 hrsday
िजरसथजन Rajasthan 0630 hrsday 0630 hrsday
उतति परिश Uttar Pradesh 2157 hrsday 2157 hrsday
उततिजखड Uttarakhand 2359 hrsday 2359 hrsday
पशचिमी कषतर Western Region
छततीसगढ़ Chhattisgarh 18 hrsday 18 hrsday
गरिजत Gujarat 8 hrsday 8 hrsday
मधय परिश Madhya Pradesh Three-Phase Supply(Irrigation)- 0953 hrs day Three-Phase
(Mixed) Supply - 2334 hrs day
Three-Phase Supply(Irrigation)- 0953 hrs day Three-Phase
(Mixed) Supply - 2334 hrs day
महजिजषटर Maharashtra Three-Phase Supply(Irrigation)- 9 hrs day Three-Phase Supply(Irrigation)- 9 hrs day
गोवज Goa No restriction No restriction
दकषकषणी कषतर Southern Region
आनधर परिश Andhra Pradesh 07 hrsday 07 hrsday
तलगजनज Telangana 24 hrsday 24 hrsday
कनजाटक Karnataka 6 hrsday 6 hrsday
किल Kerala No Restrictions No Restrictions
तममल नजड Tamil Nadu 9 hrsday (6 hrs during day time and 3 hrs during night time) 9 hrsday (6 hrs during day time and 3 hrs during night time)
पडचिी Puducherry No Restrictions No Restrictions
परवी कषतर Eastern Region
बबहजि Bihar 18 hrsday 18 hrsday
झजिखणड Jharkhand 20 hrsday 20 hrsday
ओडडशज Odisha 24 hrsday 24 hrsday
पशशचम बगजल West Bengal 23 hrsday 23 hrsday
28
मारच 2019 कषि कषतर को षिदयत आपरतच का षििरण Power Supply to Agricultural Sector during March2019
राजय कषतर State Regionऔसत वरवदयत आपरत ण घनरो म Average Hours of Supply
On segregated feeders
SNo Contents Page
1 Growth of Installed Capacity since 6th Plan 29
2 Progress of Transmission Sector since 6th Plan 30
3 All India Yearly Coal consumption for Power Generation (Utilities)
4 All India Annual Per Capita Consumption of Electricity since -2006
5 Average cost of power supply amp Average realisation (Paisakwh)
6 Growth of Rural Electrification amp Pump Sets Energisation
7 Status of Hydro Schemes Cleared by the CEA in Apr-2019
Section G - Growth of Power Sector
31
32
(In MW)
Coal Gas Diesel Total
End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472
End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634
End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537
End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596
End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921
End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703
End of 12th Plan 19216288 2532938 83763 21832988 6780 4447842 50018 31960630
Up to Apr-2019 20070450 2493722 63763 22627934 678000 4539922 7764163 35610019
Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-17) = 51529 MW
Electricity Generation (MU) Targets and Achievements for 2016-17
Coal Gas Diesel Nuclear Hydro Res Total
2007045 2493722 637629 678000 453992 77641625 22925174
29
1 Growth of Installed Capacity Since 6th Plan
Plan YearThermal
Nuclear Hydro RES (MNRE) Total
2007045
2493722637629
678000
4539922
77641625
Total Installed Capacity 35610019 MW
Coal Gas Diesel Nuclear Hydro Res
Progress of Transmission Sector in the Country up to April 2019
1 TRANSMISSION LINES (All fig in CKM)
At the end of
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
6th plan 0 0 0 0 0 0 0 0 0 0 0 0 1831 4198 0 6029 1641 44364 0 46005 3472 48562 0 52034
7th plan 0 0 0 0 0 0 0 0 0 0 0 0 13068 6756 0 19824 4560 55071 0 59631 17628 61827 0 79455
8th plan 0 0 0 0 1634 0 0 1634 0 0 0 0 23001 13141 0 36142 6564 73036 0 79600 31199 86177 0 117376
9th plan 0 0 0 0 3234 1504 0 4738 751 409 0 1160 29345 20033 0 49378 8687 88306 0 96993 42017 110252 0 152269
10th plan 0 0 0 0 4368 1504 0 5872 1775 409 0 2184 48708 24730 0 73438 9444 105185 0 114629 64295 131828 0 196123
11th Plan 0 0 0 0 5948 1504 1980 9432 4839 411 0 5250 71023 30191 5605 106819 10140 125010 830 135980 91950 157116 8415 257481
12th Plan 6124 0 0 6124 5948 1504 1980 9432 25465 1177 4598 31240 92482 48240 17065 157787 11014 151276 978 163268 141033 202197 24621 367851
13th Plan (Up
to Mar2019)6124 0 0 6124 5948 1504 1980 9432 33692 1512 6605 41809 101335 58238 21173 180746 11734 162552 1010 175296 158833 223806 30768 413407
13th Plan (Up
to Apr-19)6124 0 0 6124 5948 1504 1980 9432 33745 1512 6605 41862 101335 58258 21173 180766 11734 162953 1010 175697 158886 224227 30768 413881
27150 600 MW of 132 kV Inter-Regional power transmission capacity links which are operated radially from time to time is not added in the total
75050
47900
24000
99050
30
Grand Total
Note - The figure upto the end of 10th plan in for stringing progress including the lines not commissioned Now only commissioned lines are reckoned Accordingly the figure for 10th plan (end) may read
as 187555 after adjusting with (-) 10852 Ckm
Inter-regional Power Transfer Capacity (MW)
plusmn 800 kV HVDC plusmn 500 kV HVDC 765 kV 400 kV 220 kV
IR addition in 12th
Plan (up to March
2017)
Inter-regional
Transmission
Capacity at the end
of Plan Period 2017-
22 (as on April19)
IR at the end of 11th
PlanIR at the end of 12th
Plan
IR Capacity Addition
at the end of Plan
Period 2017-22 (Till
April 19)
2004-05 27800
2005-06 28100
2006-07 30200
2007-08 33000
2008-09 35500
2009-10 36700
2010-11 38700
2011-12 41756
2012-13 45460
2013-14 48940
2014-15 53040
2015-16 54590
2016-17 57430
2017-18 60800
2018-19 62890
Year
2005-06
2006-07
2007-08
2008-09
2009-10
2010-11
2011-12
2012-13
2013-14
2014-15
2015-16
2016-17
2017-18
2018-19
2004-05 254 209 7568
2005-06 260 221 7636
2006-07 276 227 7423
2007-08 293 239 7727
2008-09 340 263 8713
2009-10 355 268 8870
2010-11 398 303 11975
2011-12 455 330 13514
2012-13 501 376 14867
2013-14 518 175
2014-15 520
Source- PFC Reports on the performance of State Power Utilities 31
1181
7335
7786
91441
8188
88363
957
1010
1075
1122
1149
(GrossGen+ Net Import) Mid-year population Provisional
5 Average cost of power supply amp average realization ( paiseKWH )
Yearcost of supply
(paiseunit)
Realization(paiseunit)
Including AgricultureOnly
Agriculture
6719
7171
3 All India yearly Coal Consumption for Power Generation (Utilities)
YEARCoal Consumption
Million Tonnes
4 All India Annual per Capita consumption of Electricity Since 2006
Per Capita Consumption ( kWh)
6314
Sl
NoExecuting Agency
Installed
Capacity (MW)Cost (Rs crore)
Date of
Clearance
32
Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as
Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received
from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made
available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified
villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is
independent of the earlier published reports
No Hydro Electric Project has been issued concurrenceAppraisal letter by CEA during April 2019
7 Status of Hydro Schemes Cleared by the CEA in Apr-2019
Name of Scheme
1999-002000-01
297594
010408 to 310309010409 to 310310
10th Plan
2005-062006-07
322968331020
6 Growth Of Rural Electrification amp Pumpsets Energisation
Plan Year
9th Plan2002-03
134092626
4111
Pump Sets Energised Villages Electricfied (Nos)
2001-02
284064367244
1218
27801997-981998-99
3207
482864
12632
1576036
4451722594
15455554
2314176
397343611750
2093311060316074
65109527813884
46708
18423975
499150
2003-042004-05
5743
9769
Cumu upto End of 10th Plan
010407 to 310308
010410 to 310311557976840909
010411 to 310312
412667
86293726
No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification
since 2004-05
65291374575 296361511th Plan
Cumu upto End of 11th Plan
596556 21212860
557439Cummulative up to end of 12th Plan
SN Contents Page
1 Rate of sale of power for the year 2016-17 33-41
RATE OF SALE OF POWER FOR THE YEAR 2016-17
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) NORTHERN REGION
CENTRAL SECTOR
BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 18000 66900 19800
CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 54000 222400 21600
CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 30000 144400 19600
CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 23100 91700 42600
PARBATI - III HPS NHPC LTD HYDRO-HYDRO 52000 68200 54800
DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 28000 95600 30000
CHUTAK NHPC LTD HYDRO-HYDRO 4400 22000 79800
DULHASTI HPS NHPC LTD HYDRO-HYDRO 39000 228000 56400
SALAL HPS NHPC LTD HYDRO-HYDRO 69000 342300 11000
TANAKPUR HPS NHPC LTD HYDRO-HYDRO 9420 43000 29600
URI HPS -I NHPC LTD HYDRO-HYDRO 48000 280300 16000
URI HPS - II NHPC LTD HYDRO-HYDRO 24000 147300 48600
NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 4500 24600 88200
SEWA - II NHPC LTD HYDRO-HYDRO 12000 47100 43400
ANTA CCPP NTPC LTD THERMAL-GASN 41930 67539 32400
AURAIYA CCPP NTPC LTD THERMAL-GASN 66336 53501 39100
BADARPUR TPS NTPC LTD THERMAL-COAL 70500 159153 44800
DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 84000 296170 42300
DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 98000 526686 46300
DADRI CCPP NTPC LTD THERMAL-GASHSD 82978 227469 33000
FARIDABAD CCPP NTPC LTD THERMAL-GASN 43159 115577 30800
RIHAND STPS I NTPC LTD THERMAL-COAL 100000 596766 24500
RIHAND STPS II NTPC LTD THERMAL-COAL 100000 737069 24600
RIHAND STPS III NTPC LTD THERMAL-COAL 100000 706546 30600
SINGRAULI STPS NTPC LTD THERMAL-COAL 200000 1394068 20400
TANDA TPS NTPC LTD THERMAL-COAL 44000 295438 40800
UNCHAHAR TPS I NTPC LTD THERMAL-COAL 42000 256454 39800
UNCHAHAR TPS II NTPC LTD THERMAL-COAL 42000 273577 38900
UNCHAHAR TPS III NTPC LTD THERMAL-COAL 21000 142780 43000
KOLDAM NTPC LTD HYDRO-HYDRO 80000 363260 43600
NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 303575 25841
RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 108000 668677 35374
NJHPS SJVNL HYDRO-HYDRO 150000 699496 23820
RAMPUR HPS SJVNL HYDRO-HYDRO 41202 195982 32260
TEHRI HPP THDC HYDRO-HYDRO 100000 272543 51800
KOTESHWAR HEP THDC HYDRO-HYDRO 40000 106244 53400
IGSTPS JHAJJAR ARAVALI P CPL THERMAL-COAL 150000 510429 49490
NEYVELI BARSINGSAR NEYVELI LIG CORP LTD THERMAL-LIG 25000 127520 38040
STATE SECTOR
PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 21000 14222 48200
PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 21000 19205 48400
PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 25000 102257 42600
PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 25000 62107 41800
DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 60000 312213 41000
RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 120000 35767442200
WYC HYDEL STATION HPGCL HYDRO-HYDRO 6240 20365 24900
GIRI POWER HOUSE HPSEB HYDRO-HYDRO 6000 13958 7600
ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 1695 5467 11900
BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 12000 18528 6700
GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 2250 7462 22500
BASSI POWER HOUSE HPSEB HYDRO-HYDRO 6600 29649 7500
BINWA POWER HOUSE HPSEB HYDRO-HYDRO 600 2749 19300
ANNEXURE-I
RATE OF SALE OF POWER FOR THE YEAR 2016-2017
Page 33
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) GAJ POWER HOUSE HPSEB HYDRO-HYDRO 1050 2914 26700
BANER POWER HOUSE HPSEB HYDRO-HYDRO 1200 2864 16200
HOLI POWER HOUSE HPSEB HYDRO-HYDRO 300 616 22500
THIROT POWER HOUSE HPSEB HYDRO-HYDRO 450 1126 22500
KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 1200 3064 22500
LARJI POWER HOUSE HPSEB HYDRO-HYDRO 12600 53677 23700
NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 250 750 31000
CHABA POWER HOUSE HPSEB HYDRO-HYDRO 175 465 23300
RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 150 101 13400
SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 200 000 22500
KILLAR HPSEB HYDRO-HYDRO 030 050 22500
BHABA AUGUMENP H HPSEB HYDRO-HYDRO 450 1276 22500
BS CHAMBA HPSEB HYDRO-HYDRO 045 099 19500
GUMMA HPSEB HYDRO-HYDRO 300 423 22500
GAS TURBINE POWER STATION IPGCL THERMAL-GAS 27000 67233 39300
PPS-I PPCL THERMAL-GAS 33000 175905 38300
PPS-III PPCL THERMAL-GAS 137120 196879 36100
LOWER JHELUM JampKPDD HYDRO-HYDRO 10500 60214 5100
UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 2260 10514 6300
UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 10500 44202 8500
GANDHARBAL JampKPDD HYDRO-HYDRO 1500 8925 4700
KARNAH MPH JampKPDD HYDRO-HYDRO 200 1122 31000
CHENANI I JampKPDD HYDRO-HYDRO 2330 10892 6600
CHENANI II JampKPDD HYDRO-HYDRO 200 1188 9300
CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 750 3634 14200
IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 375 2108 18500
IGO MERCHELLONG JampKPDD HYDRO-HYDRO 300 1572 29700
PAHALGAM MHP JampKPDD HYDRO-HYDRO 450 1713 32900
MARPACHOO JampKPDD HYDRO-HYDRO 075 375 29800
HAFTAL JampKPDD HYDRO-HYDRO 100 483 28700
SANJAK JampKPDD HYDRO-HYDRO 126 441 36000
SEWA-III JampKPDD HYDRO-HYDRO 900 3273 20200
BHADERWAH JampKPDD HYDRO-HYDRO 150 935 8900
BAZGO JampKPDD HYDRO-HYDRO 030 108 33300
SUMOOR JampKPDD HYDRO-HYDRO 010 045 35400
HUNDER JampKPDD HYDRO-HYDRO 040 176 26200
STAKNA JampKPDD HYDRO-HYDRO 400 1933 4100
KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 124000 662879 31360
SURATGARH TPS RRVUNL THERMAL-COAL 150000 402328 41730
CHHABRA TPS 1amp 2 RRVUNL THERMAL-COAL 50000 305946 36700
CHHABRA TPS 3 RRVUNL THERMAL-COAL 25000 151536 36700
CHHABRA TPS 4 RRVUNL THERMAL-COAL 25000 155896 36700
RAMGARH GT POWER PROJECT RRVUNL THERMAL-COAL 22050 43177 41800
RAMGARH GAS T P PROJECT 3 RRVUNL THERMAL-GAS 5000 93615 41800
DHOLPUR C C POWER PROJECT RRVUNL THERMAL-R-LNG 33000 9486 46110
MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 14000 20855 34192
MINI MICRO HYDEL (MMH) P S RRVUNL HYDRO-HYDRO 2385 851 37800
KALISINDH TPP 1 RRVUNL THERMAL-COAL 60000 341543 45000
KALISINDH TPP 2 RRVUNL THERMAL-COAL 60000 211588 45000
KHARA HEP UPJVNL HYDRO-HYDRO 7200 26654 7200
MATATILLA HEP UPJVNL HYDRO-HYDRO 3060 12219 6500
OBRA HEP UPJVNL HYDRO-HYDRO 9900 21517 6300
RIHAND UPJVNL HYDRO-HYDRO 30000 57369 5500
ANPARA A TPS UPRVUNL THERMAL-COAL 63000 317536 27000
ANPARA B TPS UPRVUNL THERMAL-COAL 100000 705605 22700
ANPARA D UPRVUNL THERMAL-COAL 100000 300158 39800
HARDUAGANJ TPS UPRVUNL THERMAL-COAL 16500 45817 49200
HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 50000 304389 46600
OBRA A TPS UPRVUNL THERMAL-COAL 28800 13158 34000
OBRA B TPS UPRVUNL THERMAL-COAL 100000 328124 21900
Page 34
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) PANKI TPS UPRVUNL THERMAL-COAL 21000 66488 50300
PARICHHA TPS UPRVUNL THERMAL-COAL 22000 38762 49400
PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 42000 231931 45600
PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 50000 276722 50400
CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 24000 70845 8290
CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 14400 75366 8390
DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 3375 9595 12080
DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 5100 18701 10520
KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4140 17359 12330
KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 12000 33001 9420
KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 3000 11953 8320
TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 9000 33983 12460
MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 30400 124510 16110
RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 19800 17897 10550
MPUR UTTARAKHAND JVNL HYDRO-HYDRO 930 5121 19200
PATHRI UTTARAKHAND JVNL HYDRO-HYDRO 2040 11636 14200
GALOGI UTTARAKHAND JVNL HYDRO-HYDRO 300 648 12500
PRIVATE SECTOR
MGTPP CLP INDIA PVT LTD THERMAL-COAL 132000 268902 41940
SHRINAGAR HEP ALAKNANDA HPCL HYDRO-HYDRO 33000 127414 48800
GAMA INFRAPROP CCPP GAMA INFRAPROP PVT THERMAL-GAS 22500 52686 47000
PPGCL (BARA) JP POWER VENTURES LTD THERMAL-COAL 198000 448200 38500
MALANA HEP MALANA PCL HYDRO-HYDRO 8600 26354 29792
MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 10000 30369 32580
ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 19200 56347 36079
KASHANG HEP H P PCL HYDRO-HYDRO 19500 5034 29200
BASPA-II HEP HBPCL HYDRO-HYDRO 30000 132769 13600
KARCHAM WANGTOO HEP HBPCL HYDRO-HYDRO 100000 434386 36600
RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 108000 582600 43700
RITHALA COMBI CY POWER PLANT TATA POWER DDL THERMAL-GAS 9480 000 11900
RAJPURA TPS NABHA POWER LTD THERMAL-GAS 140000 901484 39000
TALWANDI SABO POWER LTD TALWANDI SABO POWER LTD THERMAL-COAL 198000 636040 49548
ROJA THERMAL POWER STATION ROJA POWER SCL THERMAL-COAL 120000 727200 43400
KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 34400 63400
BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 36000 62600
MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 38200 60800
UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 37900 61500
KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 42300 58800
LALITPUR PGCL BAJAJ ENERGY PVT LTD THERMAL-COAL 198000 359400 47300
PRAYAGRAJ PGCL PRAYAGRAJ PGCL THERMAL-COAL 132000 448200 38595
KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 132000 783182 33438
WESTERN REGION
CENTRAL SECTOR
INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 100000 325333 23892
OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 52000 141663 34001
GANDHAR CCPP NTPC LTD THERMAL-GAS 65739 221924 28700
KAWAS CCPP NTPC LTD THERMAL-GASN 65620 167929 27000
KORBA I amp II NTPC LTD THERMAL-COAL 210000 1499171 20500
KORBA III NTPC LTD THERMAL-COAL 50000 358746 26600
SIPAT STPS I NTPC LTD THERMAL-COAL 198000 1479902 26800
SIPAT STPS II NTPC LTD THERMAL-COAL 100000 766549 26500
VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 126000 693142 25800
VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 100000 608781 23800
VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 100000 673475 27600
VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 100000 655924 32900
VINDHYACHAL STPS V NTPC LTD THERMAL-COAL 50000 328265 31700
MOUDA I NTPC LTD THERMAL-COAL 100000 343130 44500
MOUDA Ii NTPC LTD THERMAL-COAL 66000 40637 39900
RATNAGIRI GAS amp POWER PVT LTD RGPPL THERMAL-GAS 196708 442485 47000
KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 000 24729
TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 32000 201227 10740
Page 35
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 365122 19069
TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 787444 29324
STATE SECTOR
GSEG-HAZIRA15610 MW GUJARAT S ENEGEN LTD THERMAL-GAS 15610 1805 28200
GSEG-HAZIRA35143 MW GUJARAT S ENEGEN LTD THERMAL-GAS 35130 22276 51300
GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 21978 51800
AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 13929 26100
KORBA TPS EAST CSPGCL THERMAL-COAL 44000 198673 33880
DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 365808 27570
KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 316500 30420
HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 532878 19410
CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 515 58300
MTTPS CHAMPA U-I CSPGCL THERMAL-COAL 50000 220376 39000
MTTPS CHAMPA U-II CSPGCL THERMAL-COAL 50000 23709 10000
SHP GANGREL CSPGCL HYDRO-HYDRO 1000 2350 36790
BANGO HEP CSPGCL HYDRO-HYDRO 12000 14662 8900
MHP KORBA WEST CSPGCL HYDRO-HYDRO 170 859 38190
SIKASAR HEP CSPGCL HYDRO-HYDRO 700 418 26870
DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8843 74500
DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 19446 51500
GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 66388 71600
GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127488 41300
KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 96072 43900
KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 29841 56400
SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 184966 58800
UKAI 1-5 GSECL THERMAL-COAL 85000 204891 46900
UKAI TPS 6 GSECL THERMAL-COAL 50000 284448 48200
WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 271999 58300
WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 82808 44100
KADANA HPS GSECL HYDRO-HYDRO 24200 34433 16800
UKAI HPS GSECL HYDRO-HYDRO 30500 40585 6100
TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 123000 11500
BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 8900 10900
BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 7200 27500
JHINNA HPS MPPGCL HYDRO-HYDRO 2000 9700 18500
RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 44300 3400
GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 17300 4600
SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 4100 16900
MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 14600 27000
PENCH HPS MPPGCL HYDRO-HYDRO 16000 23700 8100
RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 3000 16900
AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 134400 35100
SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 283800 38700
SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 344600 34300
SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 111600 61600
SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 211800 58000
SSTPS PH-I MPPGCL THERMAL-COAL 120000 233100 84300
BHUSAWAL TPS MSPGCL THERMAL-COAL 142000 566258 51100
CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1365682 33700
KHAPERKHEDA MSPGCL THERMAL-COAL 134000 706207 39100
KORADI TPS MSPGCL THERMAL-COAL 62000 443206 42000
NASIK TPS MSPGCL THERMAL-COAL 63000 297275 47000
PARLI TPS MSPGCL THERMAL-COAL 113000 175934 71600
PARAS MSPGCL THERMAL-COAL 50000 267931 38700
URAN CCPP MSPGCL THERMAL-GAS 67200 320330 30600
KOYANA MSPGCL HYDRO-HYDRO 195600 328155 13100
SMALL HYDRO POWER PLANTS MSPGCL HYDRO-HYDRO 45400 93062 30500
BHIRA MSPGCL HYDRO-HYDRO 8000 10046 8400
TILLARI MSPGCL HYDRO-HYDRO 8900 10584 3100
SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 233298 20500
SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 87633 20500
PRIVATE SECTOR
Page 36
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 81282 46750
JNSTPP(JAYPEE NIGRIE) JP POWER VENTURES LTD THERMAL-COAL 132000 726695 29310
MB POWER MB POWER THERMAL-COAL 120000 345632 38310
ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 754922 28671
ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 780761 23495
ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 198000 1263784 32090
ADANI POWER MAHARA ADANI POWER LTD THERMAL-COAL 330000 1666191 34124
AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 170065 36827
SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 252035 45129
ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 458551 36000
ESSAR POWER MP LTD ESSAR POWER MP LTD THERMAL-COAL 60000 243040 28600
VEDANTA LTD (P P -I) VEDANTA LTD THERMAL-GAS 3000 15044 24000
VEDANTA LTD (P P -II) VEDANTA LTD THERMAL-GAS 3000 21293 24000
PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 8234600 24000
165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 5850 64390
145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 68717 40349
SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 132655 28776
SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 144686 38567
MUNDRA UMPPCOASTAL GUJARAT POWER
LTD THERMAL-IMP COAL 400000 2530300
23900
LANCO AMARKANTAK TPP PATHADIH
U-ILANCO AMARKAN POWER LTD THERMAL-COAL 30000 195500
29200
LANCO AMARKANTAK TPP PATHADIH
U-IILANCO AMARKAN POWER LTD THERMAL-COAL 30000 206900
27600
BARADARHA TPS D B POWER LTD THERMAL-COAL 120000 677373 29200
JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 405000 28900
JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 453000 40500
DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 339437 40700
TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 293400 44000
TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 137200 37000
TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 174900 44000
BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 92900 14100
BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23700 34300
KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 27600 48300
CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2530300 23900
BHANDARDRA HEP -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 2475 54900
SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 161400 26500
SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 445000 39000
SOTHERN REGION
CENTRAL SECTOR
NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 325699 54820
NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 305532 39880
NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 998805 38510
NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 113016 54070
NEYVELI TAMILNADU POWER LTD JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 625274 42200
VALLUR TPS NTPC TECL THERMAL-COAL 150000 856438 42350
R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 1493 84300
RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1502919 29400
RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 341291 31800
SIMHADRI I NTPC LTD THERMAL-COAL 100000 688382 36800
SIMHADRI II NTPC LTD THERMAL-COAL 100000 663657 43400
KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 593110 31324
MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 291625 21764
KKNPP-1 amp 2 NPCIL NUCLEAR-NUCLEAR 200000 572609 40948
MINICOY LAKSHADEEP THERMAL-DIESEL 340 770 29600
KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1097 29600
AMINI LAKSHADEEP THERMAL-DIESEL 265 509 29600
ANDROTT LAKSHADEEP THERMAL-DIESEL 219 524 29600
KALPENI LAKSHADEEP THERMAL-DIESEL 175 356 29600
AGATTI LAKSHADEEP THERMAL-DIESEL 195 658 29600
KADMAT LAKSHADEEP THERMAL-DIESEL 190 414 29600
KILTAN LAKSHADEEP THERMAL-DIESEL 150 269 29600
CHETLET LAKSHADEEP THERMAL-DIESEL 100 139 29600
BITRA LAKSHADEEP THERMAL-DIESEL 043 024 29600
BANGARAM LAKSHADEEP THERMAL-DIESEL 018 009 29600
Page 37
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) STATE SECTOR
Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 721811 46500
Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 50000 336142 46500
RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 237358 46500
RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 239926 46500
RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 124500 46500
SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 62109 46500
UPPER SILERU APGENCO HYDRO-HYDRO 24000 33000 46500
LOWER SILERU APGENCO HYDRO-HYDRO 46000 81066 46500
DONKARAI APGENCO HYDRO-HYDRO 2500 6007 46500
PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 1262 46500
CHETTIPETA APGENCO HYDRO-HYDRO 100 214 46500
MUCHKUND APGENCO HYDRO-HYDRO 12000 37571 46500
NAGARJUNASAGAR RCPH APGENCO HYDRO-HYDRO 9000 606 46500
TUNGABHADRA HES amp HAMPI(AP
Share)
APGENCO HYDRO-HYDRO 7200 6100 46500
KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 352232 42600
KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 288131 32500
KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 319272 46500
RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 40073 44300
KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 308317 46000
KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 308963 51300
SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 61004 76600
NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 17960 75300
PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 20873 58300
POCHAMPAD-I TSPGENCO HYDRO-HYDRO 2700 5455 29800
POCHAMPAD-II TSPGENCO HYDRO-HYDRO 900 1932 40700
NIZAMSAGAR TSPGENCO HYDRO-HYDRO 1000 1126 53400
RAICHUR TPS 1 to 7 KPCL THERMAL-COAL 147000 890866 43800
RAICHUR TPS 8 KPCL THERMAL-COAL 25000 159523 48200
BELLARI TPS 1 KPCL THERMAL-COAL 50000 318679 51100
BELLARI TPS 2 KPCL THERMAL-COAL 50000 232347 55600
BELLARI TPS 3 KPCL THERMAL-COAL 70000 47565 34400
BHADRA PH KPCL HYDRO-HYDRO 3920 2369 45900
GERUSUPPA PH KPCL HYDRO-HYDRO 24000 26990 22000
GHAT PRABHA HEP KPCL HYDRO-HYDRO 3200 4777 25300
KADRA HPS KPCL HYDRO-HYDRO 15000 16889 26800
NAGJHARI KPCL HYDRO-HYDRO 90000 155159 9800
KODASALLI DPH KPCL HYDRO-HYDRO 12000 14854 19200
MUNIRA+MGH+SPH+SPH KPCL HYDRO-HYDRO 22640 48211 7900
SHARAVATHY HPS KPCL HYDRO-HYDRO 108550 276215 5400
ALMATTI DPH KPCL HYDRO-HYDRO 29000 39611 24600
VARAHI UGPH KPCL HYDRO-HYDRO 46000 71368 15600
IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 17196 15300
IDUKKI HPS KSEB HYDRO-HYDRO 78000 137905 15300
KAKKAD HPS KSEB HYDRO-HYDRO 5000 13063 15300
KALLADA HPS KSEB HYDRO-HYDRO 1500 4436 15300
KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 46544 15300
KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 635 15300
LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 30822 15300
MALANKARA HPS KSEB HYDRO-HYDRO 1050 2474 15300
MATTUPETTY KSEB HYDRO-HYDRO 200 230 15300
MALAMPUZHA KSEB HYDRO-HYDRO 250 063 15300
CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 864 15300
URUMI ST I amp II KSEB HYDRO-HYDRO 615 903 15300
LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 248 15300
NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7765 19625 15300
PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 16601 15300
PANNIAR HPS KSEB HYDRO-HYDRO 3240 6217 15300
PORINGALKUTHU KSEB HYDRO-HYDRO 3600 10052 15300
PORINGALKUTHU LBE KSEB HYDRO-HYDRO 1600 9438 15300
PEPPARA KSEB HYDRO-HYDRO 300 395 15300
POOZHITHODE KSEB HYDRO-HYDRO 480 1045 15300
Page 38
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) PEECHI KSEB HYDRO-HYDRO 125 040 15300
RANI-PERUNADU KSEB HYDRO-HYDRO 400 585 15300
SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 79783 15300
SENGULAM HPS KSEB HYDRO-HYDRO 5120 11558 15300
SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 16711 15300
VILANGAD KSEB HYDRO-HYDRO 750 1578 15300
BARAPOLE KSEB HYDRO-HYDRO 1500 1932 15300
VELLATHOOVAL KSEB HYDRO-HYDRO 360 305 15300
CHIM0NY KSEB HYDRO-HYDRO 250 156 15300
ADYANPARA KSEB HYDRO-HYDRO 350 501 15300
BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 554 15300
KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 3801 15300
KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 23132 32800
ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 14416 62280
METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 523970 62280
METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 321270 62280
NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 336575 62280
NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 591240 62280
TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 508966 62280
KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 30897 62280
VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 18720 90699 62280
KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 33593 62280
BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 1047 62280
PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 1250 62280
PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 330 62280
MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 4897 62280
MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 032 62280
KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15681 62280
KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 40608 62280
KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 21342 62280
KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 4717 62280
KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4322 62280
KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2399 62280
METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 4416 62280
METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 8035 62280
BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2187 62280
BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2359 62280
BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2511 62280
BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 1949 62280
BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 1819 62280
POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 172 62280
SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 241 62280
MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 026 62280
THIRUMOORTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 136 62280
PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 9309 62280
VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 353 62280
SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 4192 62280
PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 6571 62280
SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 1186 62280
SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6319 62280
ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 6122 62280
KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 28674 62280
SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 18381 62280
SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 4258 62280
KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 12680 62280
KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4201 62280
ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 000 62280
PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 19175 62280
AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 078 62280
BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 504 62280
BHAVANI KATTALAI (BKB)(IIIampIII BB I amp II)TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 5847 62280
PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 000 62280
Page 39
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) SRI DAMODARAM STPS APPDCL THERMAL-COAL 160000 808108 36300
PRIVATE SECTOR
KARUPPUR TANJORE LANCO TANJORE PCL THERMAL-GAS 12000 48096 28770
SIMHAPURI ENERGY LTD SIMHAPURI ENERGY LTD THERMAL-COAL 60000 143900 39100
JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 7111 45500
SBU 1 JSW ENERGY LTD
VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 26000 159100
43300
SBU 2 JSW ENERGY LTD
VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 60000 247900
42800
LANCO KPLLANCO KONDAPALLI POWER
LTDTHERMAL-GAS 36814 85060
25776
LANCO KPL STG -IILANCO KONDAPALLI POWER
LTDTHERMAL-GAS 36600 12979
46330
LANCO KPL STG -IIIALANCO KONDAPALLI POWER
LTDTHERMAL-GAS 37100 85710
46330
LANCO KPL STG -III BLANCO KONDAPALLI POWER
LTDTHERMAL-GAS 37100 43639
46330
HINDUJA NATIONAL PCL HINDUJA NATIONAL PCL THERMAL-COAL 104000 303000 38200
MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 121164 49940
UDUPI POWER COR LTD ADANI POWER LTD THERMAL-COAL 120000 754613 42500
SPECTRUM POWER GENERATION
LTD SPECTRUM PG LTD THERMAL-GASN 20525 9256812
34952
TAQA NEYVELI POWER COM PVT
LTD TAQA NEYVELI THERMAL-LIG 25000 5840
34500
ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 251000 51000
ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 207860 36800
GMR VEMAGIRI POWER GENERATION
LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 30117
46450
EASTERN REGION
CENTRAL SECTOR
MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 64675 53113
MTPS STAGE - II KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 39000 1432 69138
BOKARO `B` TPS DVC THERMAL-COAL 63000 145670 31539
MEJIA TPS U 1-3 DVC THERMAL-COAL 63000 348298 31552
MEJIA TPS U 4 DVC THERMAL-COAL 21000 116099 34997
MEJIA TPS U 5-6 DVC THERMAL-COAL 50000 276427 35976
MEJIA TPS U 7-8 DVC THERMAL-COAL 100000 552854 36991
DURGAPUR STEEL TPS DVC THERMAL-COAL 100000 665550 39323
DURGAPUR TPS DVC THERMAL-COAL 21000 59270 35416
RAGHUNATHPUR TPS DVC THERMAL-COAL 120000 201650 35326
MAITHON HYDEL STA DVC HYDRO-HYDRO 6320 12200 17984
CHANDRAPURA TPSU1-3 DVC THERMAL-COAL 42000 257610 35095
CHANDRAPURA TPSU7-8 DVC THERMAL-COAL 50000 306673 34987
KODERMA TPS DVC THERMAL-COAL 100000 380180 38131
PANCHET HPS DVC HYDRO-HYDRO 8000 13360 17984
TILLAYA HPS DVC HYDRO-HYDRO 400 1410 17984
RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34700 35400
TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 277300 23200
TLDP -III NHPC LTD HYDRO-HYDRO 13200 55400 62000
TLDP -IV NHPC LTD HYDRO-HYDRO 16000 60300 25600
FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 957219 33700
FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 308943 41000
BONGAINGAON TPS NTPC LTD THERMAL-COAL 25000 153663 58600
KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 542277 34200
KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 942591 34200
BARH-II NTPC LTD THERMAL-COAL 132000 728021 44500
TALCHER TPS NTPC LTD THERMAL-COAL 46000 335521 30100
TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 702319 25600
TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1436521 24700
STATE SECTOR
BTPS(RampM) BIHAR STATE PGCL THERMAL-COAL 22000 12142 39700
BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 98331 10602
HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 50593 9482
CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 19689 2605
RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 53192 6033
UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 147208 14637
Page 40
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 60353 4519
IB TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 288567 25000
J P H GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 210 038 61100
MEYONG CHU GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 400 1086 61100
TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 122667 38200
DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 214339 43321
KOLAGHAT THERMAL POWER
STATION
WEST BENGAL PDCL THERMAL-COAL 126000 538269 31603
BAKRESHWAR THERMAL POWER
PLANT
WEST BENGAL PDCL THERMAL-COAL 105000 634876 32154
BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 45000 166855 33299
SANTHALDIH THERMAL POWER
STATION
WEST BENGAL PDCL THERMAL-COAL 50000 336442 34932
SAGARDIGHI THERMAL POWER
PROJECT
WEST BENGAL PDCL THERMAL-COAL 160000 423121 34705
JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 20344 68900
RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 24559 68900
TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 4623 68900
PURULIA PUMPED STORAGE
PROJECT
WEST BENGAL SEDCL HYDRO-HYDRO 90000 108816 68900
MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2768 68900
PRIVATE SECTOR
CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 49474 20230
CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 555500 70200
HALDIA ENERGY HALDIA ENERGY LTD THERMAL-COAL 60000 371000 50400
DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3688 63400
KAMALANGA TPS GMR KAMALANGA ENERGY LTD THERMAL-COAL 105000547670
33300
ADHUNIK POWER U-1 ADHUNIK POWER THERMAL-COAL 27000 158 44060
ADHUNIK POWER U-2 ADHUNIK POWER THERMAL-COAL 27000 168 44250
VL-JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 332800 23622
JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 43000 45250
JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 71700 37030
JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 70700 35920
JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 71100 38870
JOJOBERA UNIT 5 TATA POWER COM LTD THERMAL-COAL 12000 79300 44560
JOJOBERA UNIT 6 TATA POWER COM LTD THERMAL-WHR 12000 83700 12840
IEL KALINGANAGAR U-I TATA POWER COM LTD THERMAL-WG 6750 33400 22500
IEL KALINGANAGAR U-II TATA POWER COM LTD THERMAL-WG 6750 34800 22500
MAITHON UNIT 1 amp 2 TATA POWER COM LTD THERMAL-COAL 105000 678000 36100
HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 27500 24340
HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 28400 24340
HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 15800 24310
NORTH EASTERN REGION
CENTRAL SECTOR
LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 74100 36600
AGARTALA GT NEEPCO THERMAL-GAS 13500 88611 27210
ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 153111 32310
DOYANG HEP NEEPCO HYDRO-HYDRO 7500 25598 49801
KOPILI HEP NEEPCO HYDRO-HYDRO 20000 98186 11491
KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 19582 20237
KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 10310 17968
RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 124093 22945
TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 10100 17344 39000
STATE SECTOR
HYDRO POWER (122 Stns) ITANAGAR GOVT OF ARUNACHAL
PRADESHHYDRO-HYDRO 6971 6217270
24600
KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39514 17337
LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 82327 36810
NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 33318 48290
MYNTRIANG SHEP ST II ASSAM POWER GENCO HYDRO-HYDRO 300 567 35776
LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 9130 49200
LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 012 49200
DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 022 49200
TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 000 49200
UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 4990 16000
UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 6476 37000
UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 16494 14600
UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 3600 9556 15000
SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 758 8000
MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44070 44800
KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 154 41400
TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 091 41400
MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 411 41400
MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 394 41400
KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 760 41400
SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 3264 41400
LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 044 41400
BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 18953 28000
ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 43585 28200
GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 4080 11100
Note
LIG Lignite N Naptha WHR Waste Heat Recovery
Page 41
(i) CAPACITY ADDTION TARGETS AND ACHIEVEMENTS IN THE 12TH PLAN Figures in MW
TARGET ACH TARGET ACH TARGET ACH TARGET ACH
CENTRAL 14878 15869 6004 2584 5300 2000 26182 20453
STATE 13922 22201 1608 2276 0 0 15530 24477
PRIVATE 43540 53661 3285 619 0 0 46825 54280
ALL INDIA 72340 91730 10897 5479 5300 2000 88537 99209
(ii) CAPACITY ADDITION TARGET AND ACHIEVEMENT FOR 2017-18 (IN MW)
THERMAL HYDRO NUCLEAR
TARGET ACH TARGET ACH TARGET ACH TARGET ACH
CENTRAL 4880 3170 800 390 500 6180 3560
STATE 3546 1760 300 200 0 3846 1960
PRIVATE 2940 3780 205 205 0 3145 3985
ALL INDIA 11366 8710 1305 795 500 0 13171 9505
(iii) CAPACITY ADDITION ACHIEVEMENT FOR 2018-19 (IN MW)
TARGET ACH TARGET ACH TARGET ACH TARGET ACH
CENTRAL 2760 1960 710 110 0 0 3470 2070
STATE 4506 2850 130 30 0 0 4636 2880
PRIVATE 0 972 0 0 0 0 0 972
ALL INDIA 7266 5782 840 140 0 0 8106 5922
12
SECTOR
SECTOR
TOTAL
TOTALNUCLEARHYDROTHERMAL
1 Capacity Addtion Targets and Achievements in the 12th Plan amp upto March2019
SECTORTHERMAL HYDRO NUCLEAR TOTAL
(MW)
Cummulative
Deviation
Target Achievement Target Achievement (+) (-)
Central 6040 500 0 500 0 -500
State 425615 660 0 660 0 -660
Private 0 0 0 0 0 0
Total 1029615 1160 0 1160 0 -1160
Central 600 0 0 0 0 0
State 21099 0 0 0 0 0
Private 379 0 0 0 0 0
Total 118999 0 0 0 0 0
Nuclear Central 700 0 0 0 0 0
Central 7340 500 0 500 0 -500
State 446714 660 0 660 0 -660
Private 379 0 0 0 0 0
Total 1218614 1160 0 1160 0 -1160
Electricity Generation (MU) Targets and Achievements for 2016-17
13
Hydro
All India
Capacity Addition TargetsAchievements during the Month of Apr-2019
Thermal
2 Capacity Addition Targets Achievements During Apr-2019
Schemes Sector
Target 2019-20
Apr-19 to Apr-19Apr-19
11
60
0 0
11
60
0 0 0 0
0
200
400
600
800
1000
1200
1400
Thermal Hydro Nuclear Total
MW
Targets and Achievement during 2019-20Target Achievement
0
200
400
600
800
1000
1200
Thermal Hydro Nuclear Total
1160
0 0
1160
0 0 00
MW
Target Achievement
Coal Lignite Gas Diesel Total
State 1634400 25000 287920 000 1947320 000 869755 69956 2887031
Private 2168083 108000 55800 000 2331883 000 251400 1312046 3895329
Central 1233537 25000 234406 000 1492943 162000 849622 37900 2542465
Sub Total 5036020 158000 578126 000 5772146 162000 1970777 1419902 9324825
State 2156000 104000 284982 000 2544982 000 544650 54789 3144421
Private 3474567 50000 467600 000 3992167 000 48100 2186476 6226743
Central 1650295 000 328067 000 1978362 184000 162000 66630 2390992
Sub Total 7280862 154000 1080649 000 8515511 184000 754750 2307894 11762155
State 1993250 000 79198 28788 2101236 000 1177483 58688 3337407
Private 1187450 25000 532210 27370 1772030 000 000 3749140 5521170
Central 1123502 289000 35958 000 1448460 332000 000 54190 1834650
Sub Total 4304202 314000 647366 56158 5321726 332000 1177483 3862018 10693227
State 624000 000 10000 000 634000 000 353792 27511 1015303
Private 638700 000 000 000 638700 000 39900 111637 790237
Central 1483664 000 000 000 1483664 000 100520 1000 1585184
Sub Total 2746364 000 10000 000 2756364 000 494212 140148 3390724
State 000 000 49771 3600 53371 000 42200 23325 118895
Private 000 000 2450 000 2450 000 000 6104 8554
Central 77002 000 125360 000 202362 000 100500 3000 305862
Sub Total 77002 000 177581 3600 258183 000 142700 32429 433311
State 000 000 000 4005 4005 000 000 525 4530
Private 000 000 000 000 000 000 000 738 738
Central 000 000 000 000 000 000 000 510 510
Sub Total 000 000 000 4005 4005 000 000 1773 5778
State 6407650 129000 711871 36393 7284913 000 2987880 234793 10507586
Private 7468800 183000 1058060 27370 8737230 000 339400 7366140 16442770
Central 5568000 314000 723791 000 6605791 678000 1212642 163230 8659663
Total 19444450 626000 2493722 63763 22627934 678000 4539922 7764163 35610019
Figures at decimal may not tally due to rounding off
Note -
(As per latest information available with MNRE)
Break up of RES all India as on 31032019 is given below (in MW)
459315 3562597 2818071 7764163
A 0 MW
B Apr 2019 0 MW
C
Apr 2019 0 MW
D Net Capacity Added during Apr 2019 A-B-C 0 MW
Sector wise breakup of RES capacity as shown is provisional
Share of installed capacity of BBMB Stations is included in state sector of partner states
BM PowerCogen Waste to Energy
910350 13830
Capacity Added during Apr 2019
Capacity Retired during
Capacity removed due to change
from Conventional to RES during
Islands
ALL INDIA
Abbreviation- SHP=Small Hydro Project (le 25 MW) BP=Biomass Power UampI=Urban amp Industrial Waste Power RES=Renewable Energy Sources
1 RES include SHP BP UampI Solar and Wind Energy Installed capacity in respect of RES (MNRE) as on 31032019
Small
Hydro PowerWind Power
Bio-PowerSolar Power
Total
Capacity
RES
(MNRE)
Northern Region
Western Region
Southern Region
Eastern Region
North Eastern
Region
ALL INDIA INSTALLED CAPACITY (IN MW) OF POWER STATIONS
(As on 30042019)
(UTILITIES)
Region Ownership Sector
Mode wise breakup
Grand TotalThermalNuclear Hydro
Coal Lignite Gas Diesel Total
State 13500 000 180040 000 193540 000 000 000 193540
Private 86922 000 10800 000 97722 000 000 17889 115611
Central 311272 000 20701 000 331973 10283 72309 000 414565
Sub-Total 411694 000 211541 000 623235 10283 72309 17889 723716
State 272000 000 15000 000 287000 000 110282 6930 404212
Private 408078 000 000 000 408078 000 20000 34512 462590
Central 129472 000 53561 000 183034 10094 66370181 500 259998
Sub-Total 809550 000 68561 000 878112 10094 196652 41942 1126799
State 000 000 000 000 000 000 69460 25661 95121
Private 000 000 000 000 000 000 99200 62668 161868
Central 18340 000 6201 000 24541 2895 122388 000 149824
Sub-Total 18340 000 6201 000 24541 2895 291048 88329 406813
State 000 000 17500 000 17500 000 123000 12903 153403
Private 000 000 000 000 000 000 000 6483 6483
Central 50639 000 12907 000 63547 6798 109188 000 179533
Sub-Total 50639 000 30407 000 81047 6798 232188 19386 339419
State 176000 000 15000 000 191000 000 259770 12780 463550
Private 511550 000 000 000 511550 000 28800 115462 655812
Central 85458 000 26401 000 111859 19681 92342 000 223882
Sub-Total 773008 000 41401 000 814409 19681 380912 128242 1343244
State 626000 25000 60380 000 711380 000 109618 2385 823383
Private 280200 108000 000 000 388200 000 10400 730181 1128781
Central 95625 25000 22110 000 142735 55674 73901 34400 306710
Sub-Total 1001825 158000 82490 000 1242315 55674 193919 766966 2258874
State 546900 000 000 000 546900 000 72410 2510 621820
Private 871433 000 000 000 871433 000 84200 288760 1244393
Central 379639 000 54949 000 434588 28948 180253 3000 646789
Sub-Total 1797972 000 54949 000 1852921 28948 336863 294270 2513002
State 000 000 000 000 000 000 125215 6787 132002
Private 9900 000 45000 000 54900 000 8800 52620 116320
Central 34324 000 6966 000 41290 3124 47554 000 91968
Sub-Total 44224 000 51966 000 96190 3124 181569 59407 340290
State 000 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 000 3471 3471
Central 3815 000 1503 000 5317 801 10171 000 16289
Sub-Total 3815 000 1503 000 5317 801 10171 3471 19760
124953 000 29105 000 154058 23703 75145 000 252907
State 1634400 25000 287920 000 1947320 000 869755 69956 2887031
Private 2168083 108000 55800 000 2331883 000 251400 1312046 3895329
Central 1233537 25000 234406 000 1492943 162000 849622 37900 2542465
Grand Total 5036020 158000 578126 000 5772146 162000 1970777 1419902 9324825
Delhi
Haryana
Himachal Pradesh
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
NORTHERN REGION
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
(As on 30042019)
State Ownership Sector
Mode wise breakup
Grand TotalThermalNuclear Hydro
RES
(MNRE)
Jammu amp Kashmir
Punjab
Rajasthan
Uttar Pradesh
Uttarakhand
Chandigarh
Central - Unallocated
Total (Northern
Region)
(As on 30042019)
Coal Lignite Gas Diesel Total
State 000 000 000 000 000 000 000 005 005
Private 000 000 4800 000 4800 000 000 392 5192
Central 46959 000 1967 000 48926 2600 000 000 51526
Sub-Total 46959 000 6767 000 53726 2600 000 397 56723
State 000 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 000 1447 1447
Central 14141 000 4334 000 18475 700 000 000 19175
Sub-Total 14141 000 4334 000 18475 700 000 1447 20622
State 371000 104000 217782 000 692782 000 77200 6470 776452
Private 726567 50000 396000 000 1172567 000 000 833180 2005747
Central 324243 000 42400 000 366643 55900 000 24330 446873
Sub-Total 1421810 154000 656182 000 2231992 55900 77200 863980 3229072
State 540000 000 000 000 540000 000 170366 8396 718762
Private 617400 000 10000 000 627400 000 000 418040 1045440
Central 334238 000 25700 000 359938 27300 152000 30000 569238
Sub-Total 1491638 000 35700 000 1527338 27300 322366 456436 2333440
State 228000 000 000 000 228000 000 12000 1105 241105
Private 885000 000 000 000 885000 000 000 52430 937430
Central 211075 000 000 000 211075 4800 10000 000 225875
Sub-Total 1324075 000 000 000 1324075 4800 22000 53535 1404410
State 1017000 000 67200 000 1084200 000 285084 38813 1408097
Private 1245600 000 56800 000 1302400 000 48100 880441 2230941
Central 466780 000 227273 000 694053 69000 000 12300 775353
Sub-Total 2729380 000 351273 000 3080653 69000 333184 931553 4414390
State 000 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 000 546 546
Central 19560 000 6634 000 26194 900 000 000 27094
Sub-Total 19560 000 6634 000 26194 900 000 546 27640
233300 000 19759 000 253059 22800 000 000 275859
State 2156000 104000 284982 000 2544982 000 544650 54789 3144421
Private 3474567 50000 467600 000 3992167 000 48100 2186476 6226743
Central 1650295 000 328067 000 1978362 184000 162000 66630 2390992
Grand Total 7280862 154000 1080649 000 8515511 184000 754750 2307894 11762155
Goa
Daman amp Diu
Gujarat
Madhya Pradesh
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
WESTERN REGION
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
ThermalNuclear Hydro
RES
(MNRE)
State Ownership Sector
Mode wise breakup
Grand Total
Chhattisgarh
Maharashtra
Dadra amp Nagar
Naveli
Central - Unallocated
Total (Western
Region)
(As on 30042019)
Coal Lignite Gas Diesel Total
State 501000 000 23540 000 524540 000 167360 5618 697518
Private 387388 000 381318 3680 772386 000 000 743342 1515728
Central 154683 12773 000 000 167456 12727 000 25000 205183
Sub-Total 1043071 12773 404858 3680 1464382 12727 167360 773960 2418429
State 558250 000 000 000 558250 000 247993 4122 810365
Private 83945 000 83182 000 167127 000 000 393644 560771
Central 180685 14927 000 000 195612 14873 000 1000 211485
Sub-Total 822880 14927 83182 000 920989 14873 247993 398766 1582621
State 502000 000 000 12792 514792 000 358660 19389 892841
Private 195850 000 000 2520 198370 000 000 1363591 1561961
Central 242780 40140 000 000 282920 69800 000 000 352720
Sub-Total 940630 40140 000 15312 996082 69800 358660 1382979 2807521
State 000 000 000 15996 15996 000 185650 17290 218936
Private 61500 000 17400 000 78900 000 000 19021 97921
Central 86142 28180 35958 000 150280 36200 000 5000 191480
Sub-Total 147642 28180 53358 15996 245176 36200 185650 41311 508337
State 432000 000 52408 000 484408 000 217820 12270 714498
Private 458767 25000 50310 21170 555247 000 000 1229228 1784475
Central 302532 136420 000 000 438952 144800 000 23190 606942
Sub-Total 1193299 161420 102718 21170 1478607 144800 217820 1264688 3105915
State 000 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 000 000 000
Central 000 10000 000 000 10000 000 000 000 10000
Sub-Total 000 10000 000 000 10000 000 000 000 10000
State 000 000 3250 000 3250 000 000 000 3250
Private 000 000 000 000 000 000 000 314 314
Central 14080 10760 000 000 24840 8600 000 000 33440
Sub-Total 14080 10760 3250 000 28090 8600 000 314 37004
142600 35800 000 000 178400 45000 000 000 223400
State 1993250 000 79198 28788 2101236 000 1177483 58688 3337407
Private 1187450 25000 532210 27370 1772030 000 000 3749140 5521170
Central 1123502 289000 35958 000 1448460 332000 000 54190 1834650
Grand Total 4304202 314000 647366 56158 5321726 332000 1177483 3862018 10693227
Kerala
Andhra Pradesh
Telangana
Karnataka
Total (Southern
Region)
Tamil Nadu
NLC
Puducherry
Central - Unallocated
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
SOUTHERN REGION
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
State Ownership Sector
Mode wise breakup
Grand TotalThermalNuclear Hydro
RES
(MNRE)
(As on 30042019)
Coal Lignite Gas Diesel Total
State 000 000 000 000 000 000 000 7070 7070
Private 28100 000 000 000 28100 000 000 25545 53645
Central 384933 000 000 000 384933 000 11000 000 395932
Sub-Total 413033 000 000 000 413033 000 11000 32615 456647
State 42000 000 000 000 42000 000 13000 405 55405
Private 73000 000 000 000 73000 000 000 3495 76495
Central 39374 000 000 000 39374 000 6100 000 45474
Sub-Total 154374 000 000 000 154374 000 19100 3900 177374
State 540000 000 10000 000 550000 000 98600 12195 660795
Private 243700 000 000 000 243700 000 000 35250 278950
Central 76077 000 000 000 76077 000 41000 000 117077
Sub-Total 859777 000 10000 000 869777 000 139600 47445 1056822
State 000 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 000 000 000
Central 698504 000 000 000 698504 000 18620 000 717124
Sub-Total 698504 000 000 000 698504 000 18620 000 717124
State 42000 000 000 000 42000 000 206192 2630 250822
Private 293900 000 000 000 293900 000 000 47346 341246
Central 163390 000 000 000 163390 000 8900 1000 173290
Sub-Total 499290 000 000 000 499290 000 215092 50976 765358
State 000 000 000 000 000 000 36000 5211 41211
Private 000 000 000 000 000 000 39900 001 39901
Central 8703 000 000 000 8703 000 6400 000 15103
Sub-Total 8703 000 000 000 8703 000 82300 5212 96215
112683 000 000 000 112683 000 8501 000 121184
State 624000 000 10000 000 634000 000 353792 27511 1015303
Private 638700 000 000 000 638700 000 39900 111637 790237
Central 1483664 000 000 000 1483664 000 100520 1000 1585184
Grand Total 2746364 000 10000 000 2756364 000 494212 140148 3390724
Total (Eastern
Region)
Bihar
Jharkhand
West Bengal
DVC
Odisha
Sikkim
Central - Unallocated
HydroOwnership Sector
Mode wise breakup
Grand TotalThermalNuclear
RES
(MNRE)
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
State
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
EASTERN REGION
(As on 30042019)
Coal Lignite Gas Diesel Total
State 000 000 32821 000 32821 000 10000 501 43322
Private 000 000 2450 000 2450 000 000 2650 5100
Central 40852 000 43556 000 84408 000 35708 2500 122616
Sub-Total 40852 000 78827 000 119679 000 45708 5651 171038
State 000 000 000 000 000 000 000 10711 10711
Private 000 000 000 000 000 000 000 2939 2939
Central 3705 000 4682 000 8387 000 11655 000 20042
Sub-Total 3705 000 4682 000 8387 000 11655 13650 33692
State 000 000 000 000 000 000 32200 3253 35453
Private 000 000 000 000 000 000 000 012 012
Central 4560 000 10969 000 15529 000 7227 000 22756
Sub-Total 4560 000 10969 000 15529 000 39427 3265 58221
State 000 000 16950 000 16950 000 000 1601 18551
Private 000 000 000 000 000 000 000 009 009
Central 5610 000 43695 000 49305 000 6849 500 56654
Sub-Total 5610 000 60645 000 66255 000 6849 2110 75214
State 000 000 000 3600 3600 000 000 545 4145
Private 000 000 000 000 000 000 000 344 344
Central 4710 000 7157 000 11867 000 9534 000 21401
Sub-Total 4710 000 7157 3600 15467 000 9534 889 25890
State 000 000 000 000 000 000 000 3067 3067
Private 000 000 000 000 000 000 000 100 100
Central 3210 000 4893 000 8103 000 5733 000 13836
Sub-Total 3210 000 4893 000 8103 000 5733 3167 17003
State 000 000 000 000 000 000 000 3647 3647
Private 000 000 000 000 000 000 000 050 050
Central 3105 000 4046 000 7151 000 9794 000 16945
Sub-Total 3105 000 4046 000 7151 000 9794 3697 20642
11250 000 6362 000 17612 000 14000 000 31612
State 000 000 49771 3600 53371 000 42200 23325 118895
Private 000 000 2450 000 2450 000 000 6104 8554
Central 77002 000 125360 000 202362 000 100500 3000 305862
Grand Total 77002 000 177581 3600 258183 000 142700 32429 433311
Assam
Arunachal Pradesh
Meghalaya
Tripura
Manipur
Nagaland
Mizoram
Central - Unallocated
Total (North-
Eastern Region)
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
NORTH-EASTERN REGION
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
State Ownership Sector
Mode wise breakup
Grand TotalThermalNuclear Hydro
RES
(MNRE)
(As on 30042019)
Coal Lignite Gas Diesel Total
State 000 000 000 4005 4005 000 000 525 4530
Private 000 000 000 000 000 000 000 663 663
Central 000 000 000 000 000 000 000 510 510
Sub-Total 000 000 000 4005 4005 000 000 1698 5703
State 000 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 000 075 075
Central 000 000 000 000 000 000 000 000 000
Sub-Total 000 000 000 000 000 000 000 075 075
State 000 000 000 4005 4005 000 000 525 4530
Private 000 000 000 000 000 000 000 738 738
Central 000 000 000 000 000 000 000 510 510
Grand Total 000 000 000 4005 4005 000 000 1773 5778
Andaman amp
Nicobar
Lakshadweep
Total (Islands)
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
ISLANDS
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
State Ownership Sector
Mode wise breakup
Grand TotalThermalNuclear Hydro
RES
(MNRE)
SrNo Contents Page
1 Executive summary of Target and Achievement of Transmission Lines during 2019-20
20(1)
2 List of Transmission Lines CommissionedReady for commissioning during Apr-2019 20(2)
Section C - Transmission Lines
1 Executive summary of Target and Achievement of Transmission Lines during 2019-20 As on 30-04-19
(All figures in circuit kms)
Ce
ntr
al S
ecto
r
Sta
te S
ecto
r
JV
Pri
va
te S
ecto
r
To
tal
Ce
ntr
al S
ecto
r
Sta
te S
ecto
r
JV
Pri
va
te S
ecto
r
To
tal
Ce
ntr
al S
ecto
r
Sta
te S
ecto
r
JV
Pri
va
te S
ecto
r
To
tal
Ce
ntr
al S
ecto
r
Sta
te S
ecto
r
JV
Pri
va
te S
ecto
r
To
tal
Ce
ntr
al S
ecto
r
Sta
te S
ecto
r
JV
Pri
va
te S
ecto
r
To
tal
Ce
ntr
al
Se
cto
r
Sta
te S
ec
tor
JV
Pri
va
te S
ec
tor
Gra
nd
To
tal
0 0 0 0 0 0 0 0 2727 958 2334 6019 2239 3416 1143 6798 781 10023 0 10804 5747 14397 3477 23621
Apr19 Programme 0 0 0 0 0 0 0 0 577 416 557 1550 60 890 203 1153 0 309 0 309 637 1615 760 3012
Achievement 0 0 0 0 0 0 0 0 53 0 0 53 0 20 0 20 0 401 0 401 53 421 0 474
Upto Apr-19 Programme 0 0 0 0 0 0 0 0 577 416 557 1550 60 890 203 1153 0 309 0 309 637 1615 760 3012
Achievement 0 0 0 0 0 0 0 0 53 0 0 53 0 20 0 20 0 401 0 401 53 421 0 474
20(1)
220 kV Grand Total 800 kV 500 kV
Programme 2019-20
Programme
Achievement
HVDC765 kV 400 kV
Line
1 2 3 4 5 6
1 400 Bhadla (PG) - Bhadla (RVPN) line DC PGCIL 53
53
2 400 LILO of one ckt Jhanor - Navsari at Vav Ss DC GETCO 20
3 220 Banda-Chitrakoot Line DC UPPTCL 226
4 220 Gorakhpur (PG)-Gola line DC UPPTCL 82
5 220 Hapur(765) - Faridnagar line SC UPPTCL 11
6 220 Kalikiri - Madanapalli line DC APTRANSCO 60
7 220LILO of Gr Noida -Noida Sec-129 at Noida
Sec-148DC UPPTCL 1
8 220LILO of one Ckt of Badshahpur Pali at Sec-
65 GurgaonDC HVPNL 3
9 220 Sultanpur-Sangipur LILO Section at Amethi DC UPPTCL 18
421
0
474
20(2)
Grand Total
2Transmission Lines (220 kV and above) CommissionedReady for commissioning During Apr-2019
Voltage
Level (kV)Name of Transmission Lines
Circuit
Type
Executing
Agency
CENTRAL SECTOR
Total of CENTRAL SECTOR
STATE SECTOR Sector
Total of STATE SECTOR
PRIVATE SECTOR
Total of PRIVATE SECTOR
SlNo
Length(CKm)
As on 30-04-19
SN Contents Page
1 Executive summary of Target and Achievement of Substations during 2019-20 21(1)
2Sub Stations (220 kV and above) commissionedready for commisssioning during Apr-
201921(2)
Section D - Sub Stations
1 Executive summary of Target and Achievement of Substations during 2019-2020 As on 30-04-19
(All figures in circuit MVA)
Ce
ntr
al S
ecto
r
Sta
te S
ecto
r
JV
Pri
va
te S
ecto
r
To
tal
Ce
ntr
al S
ecto
r
Sta
te S
ecto
r
JV
Pri
va
te S
ecto
r
To
tal
Ce
ntr
al S
ecto
r
Sta
te S
ecto
r
JV
Pri
va
te S
ecto
r
To
tal
Ce
ntr
al S
ecto
r
Sta
te S
ecto
r
JV
Pri
va
te S
ecto
r
To
tal
Ce
ntr
al S
ecto
r
Sta
te S
ecto
r
JV
Pri
va
te S
ecto
r
To
tal
Ce
ntr
al S
ec
tor
Sta
te S
ec
tor
JV
Pri
va
te S
ec
tor
Gra
nd
To
tal
3000 0 0 3000 0 0 0 0 18000 3000 6000 27000 5205 19665 4260 29130 800 21786 0 22586 27005 44451 10260 81716
Apr19 Programme 0 0 0 0 0 0 0 0 3000 0 3000 6000 0 1000 2000 3000 0 800 0 800 3000 1800 5000 9800
Achievement 0 0 0 0 0 0 0 0 500 0 0 500 815 1980 0 2795 0 1305 0 1305 1315 3285 0 4600
Upto Apr-19 Programme 0 0 0 0 0 0 0 0 3000 0 3000 6000 0 1000 2000 3000 0 800 0 800 3000 1800 5000 9800
Achievement 0 0 0 0 0 0 0 0 500 0 0 500 815 1980 0 2795 0 1305 0 1305 1315 3285 0 4600
21(1)
220 kV Grand Total 800 kV 500 kV
Programme 2019-20
Programme
Achievement
HVDC765 kV 400 kV
As on 30-04-19
Sl Voltage Ratio Capacity
No (kVkV) (MWMVA)
1 2 3 4 5
1 Bhadla SS (3x1500 3x500 MVA) 765400 PGCIL 500
2 Extn at Tumkur (Pavagada ) PS (2x500 MVA) 400220 PGCIL 500
3 Bongaigaon (2nd ICT) Ss 400220 PGCIL 315
Total of CENTRAL SECTOR 1315
4 Motiram Adda Gorakhpur (Aug) (Additional TF) 400220 UPPTCL 240
5 Muradnagar-II Ghaziabad (Aug) (Additional TF) 400220 UPPTCL 240
6 Noida Sec- 148 GBNagar (New) 400220 UPPTCL 5007 Sarnath Varanasi (Aug) TF- II (500-315) 400220 UPPTCL 1858 Sarojininagar Lucknow Aug) TF- II (500-315) 400220 UPPTCL 185
9 Unnao (Aug) TF-III 400220 UPPTCL 31510 Nawada SS 400220 HVPNL 31511 Kharepatan SS 22033 MSETCL 2512 Prathipadu SS 220132 APTRANSCO 10013 Pali Ss 22066 HVPNL 160
14 A-5 Faridabad Ss 22066 HVPNL 60
15 Rentachintala Ss Aug(3X100-2x100) 220132 APTRANSCO 10016 Amethi Ss 220132 UPPTCL 160
17 Gajokhar Varanasi (Aug) TF- II (160-100) 220132 UPPTCL 60
18 Gola Gorakhpur (New) 220132 UPPTCL 160
19 Khurja Bulandshahr (Aug) TF- II (200-160) 220132 UPPTCL 40
20 RC Green GB Nagar (Aug) TF-II (160-100) 220132 UPPTCL 60
21 Sikandrabad Bulandshahr (Aug) (Additional TF) 220132 UPPTCL 160
22 Sitapur (Aug) (Additional TF) 220132 UPPTCL 160
23 Sohawal Ayodhya (Aug) TF-II (160-100) 220132 UPPTCL 60
TOTAL STATE SECTOR 3285
GRAND TOTAL 4600
21(2)
CENTRAL SECTOR
STATE SECTOR
2Sub-Stations (220 kV and above) CommissionedReady for commissioning During Apr-2019
Name of Sub Stations Executing Agency
SN Contents Page
1 Electricity Generation (MU) Targets and Achievements for 2019-20 22
Section E - Electricity Generation
Programme Achievement Ach Programme Achievement Ach
Central Sector 37545100 3177900 3129530 9848 3177900 3129530 9848
State Sector 37498600 3322500 2950558 8881 3322500 2950558 8881
PvtIPP Sector 37346200 3236400 3195940 9875 3236400 3195940 9875
PvtUTL Sector 1823100 159300 165579 10394 159300 165579 10394
Total 114213000 9896100 9441607 9541 9896100 9441607 9541
Central Sector 5661700 386100 481390 12468 386100 481390 12468
State Sector 6680500 498200 536514 10769 498200 536514 10769
PvtIPP Sector 1206900 57300 80405 14032 57300 80405 14032
PvtUTL Sector 144100 12300 10930 8886 12300 10930 8886
Total 13693200 953900 1109239 11628 953900 1109239 11628
Central Sector 4472000 367300 317765 8651 367300 317765 8651
Total 4472000 367300 317765 8651 367300 317765 8651
Bhutan Import 621800 17500 24396 13941 17500 24396 13941
Central Sector 47678800 3931300 3928685 9993 3931300 3928685 9993
State Sector 44179100 3820700 3487072 9127 3820700 3487072 9127
Pvt Sector 40520300 3465300 3452854 9964 3465300 3452854 9964
Total 133000000 11234800 10893007 9696 11234800 10893007 9696
Provisional based on actual-cum-Assesment
Figs in MU
Cummulative
Achievement
Cummulative
Achievement
Mar-19 Mar-18 Upto Mar-2019 Upto Mar-2018
984785 869291 12675910 10183949
22
1 Electricity Generation (MU) Targets and Achievememts for 2019-20
All India Energy Generation During Apr-19 to Apr-19 (MU)
Target (2019-20)Apr-19 to Apr-19
Sector
Hydro
Thermal
Nuclear
Renewable Energy Generation
Achievement
Apr-2019
98961
95393673
112348
94416
11092
3178
108930
0
20000
40000
60000
80000
100000
120000
Thermal Hydro Nuclear Total
Programme
Achievement
SN Contents Page
1 Energy Power Supply Position (Provisional) for Apr-2019 and during Apr-19 to Apr-19 23
2 Peak Power Supply Position (Provisional) for Apr-2019 and during Apr-19 to Apr-19 24
3 Energy Power Supply Position (Revised) for Mar-2019 and during Apr-19 to Mar-19 25
4 Peak Power Supply Position (Revised) for Mar-2019 and during Apr-19 to Mar-19 26
5 Notified Power cuts Restrictions on Industries during Apr-2019 27
6 Power Supply to Agricultural Sector during Apr-2019 28
Section F - Power supply position
आकड़ मममलयन यननट नट Figures in MU net
ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied
कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )
चडीगढ़ Chandigarh 117 117 0 00 117 117 0 00
दिलली Delhi 2698 2698 1 00 2698 2698 1 00
हरियजणज Haryana 3773 3773 0 00 3773 3773 0 00
दहमजचल परिश Himachal Pradesh 777 777 0 00 777 777 0 00
रमम कशमीि Jammu amp Kashmir 1604 1296 308 192 1604 1296 308 192
परजब Punjab 3646 3646 0 00 3646 3646 0 00
िजरसथजन Rajasthan 6210 6208 2 00 6210 6208 2 00
उतति परिश Uttar Pradesh 10179 10148 32 03 10179 10148 32 03
उततिजखड Uttarakhand 1120 1120 0 00 1120 1120 0 00
उततरी कषतर Northern Region 30094 29786 308 10 30094 29786 308 10
छततीसगढ़ Chhattisgarh 2684 2676 8 03 2684 2676 8 03
गरिजत Gujarat 10718 10718 0 00 10718 10718 0 00
मधय परिश Madhya Pradesh 6006 6006 0 00 6006 6006 0 00
महजिजषटर Maharashtra 14308 14308 0 00 14308 14308 0 00
िमन औि दिउ Daman amp Diu 220 220 0 00 220 220 0 00
िजिि व नगि हवली Dadra amp Nagar Haveli 552 552 0 00 552 552 0 00
गोवज Goa 388 388 0 00 388 388 0 00
पशचिमी कषतर Western Region 34875 34868 8 00 34875 34868 8 00
आनधर परिश Andhra Pradesh 5708 5708 0 00 5708 5708 0 00
तलगजनज Telangana 5725 5725 0 00 5725 5725 0 00
कनजाटक Karnataka 7003 7003 0 00 7003 7003 0 00
किल Kerala 2402 2400 2 01 2402 2400 2 01
तममल नजड Tamil Nadu 10010 10010 0 00 10010 10010 0 00
पडचिी Puducherry 263 263 0 00 263 263 0 00
लकष-दवीप Lakshadweep 4 4 0 0 4 4 0 0
दकषकषणी कषतर Southern Region 31111 31109 2 00 31111 31109 2 00
बबहजि Bihar 2589 2589 0 00 2589 2589 0 00
िजमोिि घजटी ननगम DVC 1772 1772 0 00 1772 1772 0 00
झजिखणड Jharkhand 689 689 0 00 689 689 0 00
ओडडशज Odisha 2689 2689 1 00 2689 2689 1 00
पशशचम बगजल West Bengal 5075 5075 0 00 5075 5075 0 00
मसशककम Sikkim 37 37 0 00 37 37 0 00
अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 7 29 27 2 7
परवी कषतर Eastern Region 12851 12850 1 00 12851 12850 1 00
अरणजचल परिश Arunachal Pradesh 66 66 0 05 66 66 0 05
असम Assam 766 709 57 75 766 709 57 75
मणणपि Manipur 68 67 1 15 68 67 1 15
मघजलय Meghalaya 170 160 10 59 170 160 10 59
ममज़ोिम Mizoram 54 53 0 08 54 53 0 08
नजगजलड Nagaland 54 54 0 08 54 54 0 08
बिपिज Tripura 122 120 1 12 122 120 1 12
उततर-परवी कषतर North-Eastern Region 1300 1228 71 55 1300 1228 71 55
समपणण भारत All India 110231 109842 389 04 110231 109842 389 04
23
ऊरजा पनत ा म कमी ऊरजा पनत ा म कमीEnergy not Supplied
Excludes energy exported to Bangladesh
Energy not Supplied
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
ऊराण वरवदयत आपरत ण शथिरत ररपोरण (परवाणरवलोकन) Energy Power Supply Position Report (Provisional)
राजयState
अपरल 2019 April2019 अपरल2019 -अपरल2019 April2019 to April2019
अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met
कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )
चडीगढ़ Chandigarh 256 256 0 00 256 256 0 00
दिलली Delhi 5664 5664 0 00 5664 5664 0 00
हरियजणज Haryana 8127 8127 0 00 8127 8127 0 00
दहमजचल परिश Himachal Pradesh 1387 1387 0 00 1387 1387 0 00
रमम कशमीि Jammu amp Kashmir 2826 2261 565 200 2826 2261 565 200
परजब Punjab 7015 7015 0 00 7015 7015 0 00
िजरसथजन Rajasthan 10560 10560 0 00 10560 10560 0 00
उतति परिश Uttar Pradesh 19935 19935 0 00 19935 19935 0 00
उततिजखड Uttarakhand 1922 1922 0 00 1922 1922 0 00
उततरी कषतर Northern Region 54476 53985 491 09 54476 53985 491 09
छततीसगढ़ Chhattisgarh 4596 4574 22 05 4596 4574 22 05
गरिजत Gujarat 17871 17865 6 00 17871 17865 6 00
मधय परिश Madhya Pradesh 10018 10018 0 00 10018 10018 0 00
महजिजषटर Maharashtra 23158 23150 8 00 23158 23150 8 00
िमन औि दिउ Daman amp Diu 341 340 1 02 341 340 1 02
िजिि व नगि हवली Dadra amp Nagar Haveli 818 818 0 00 818 818 0 00
गोवज Goa 594 594 0 00 594 594 0 00
पशचिमी कषतर Western Region 56242 56222 20 00 56242 56222 20 00
आनधर परिश Andhra Pradesh 9151 9151 0 00 9151 9151 0 00
तलगजनज Telangana 10191 10191 0 00 10191 10191 0 00
कनजाटक Karnataka 12681 12681 0 00 12681 12681 0 00
किल Kerala 4309 4300 8 02 4309 4300 8 02
तममल नजड Tamil Nadu 15972 15972 0 00 15972 15972 0 00
पडचिी Puducherry 482 480 2 05 482 480 2 05
लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0
दकषकषणी कषतर Southern Region 49155 49103 52 01 49155 49103 52 01
बबहजि Bihar 5357 5357 0 00 5357 5357 0 00
िजमोिि घजटी ननगम DVC 3039 3039 0 00 3039 3039 0 00
झजिखणड Jharkhand 1266 1266 0 00 1266 1266 0 00
ओडडशज Odisha 5389 5389 0 00 5389 5389 0 00
पशशचम बगजल West Bengal 8666 8666 0 00 8666 8666 0 00
मसशककम Sikkim 100 100 0 00 100 100 0 00
अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7
परवी कषतर Eastern Region 23349 23349 0 00 23349 23349 0 00
अरणजचल परिश Arunachal Pradesh 139 136 3 22 139 136 3 22
असम Assam 1712 1667 45 26 1712 1667 45 26
मणणपि Manipur 197 188 9 46 197 188 9 46
मघजलय Meghalaya 336 336 0 00 336 336 0 00
ममज़ोिम Mizoram 116 113 3 26 116 113 3 26
नजगजलड Nagaland 157 131 26 166 157 131 26 166
बिपिज Tripura 292 291 1 03 292 291 1 03
उततर-परवी कषतर North-Eastern Region 2848 2780 68 24 2848 2780 68 24
समपणण भारत All India 177411 176810 601 03 177411 176810 601 03
24
मजग की पनत ा म कमी Demand not Met
Excludes the supply to Bangladesh
राजयStateअपरल 2019 April2019
मजग की पनत ा म कमी Demand not Met
अधिकतम वरवदयत आपरत ण शथिरत ररपोरण (परवाणरवलोकन) Peak Power Supply Position Report (Provisional)
आकड़ मगज वजट नट Figures in MW netअपरल2019 -अपरल2019 April2019 to April2019
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
आकड़ मममलयन यननट नट Figures in MU net
ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied
कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )
चडीगढ़ Chandigarh 96 96 0 00 1561 1561 0 00
दिलली Delhi 1931 1930 1 00 32299 32282 17 01
हरियजणज Haryana 3658 3658 0 00 53665 53665 0 00
दहमजचल परिश Himachal Pradesh 832 830 2 02 9850 9618 232 24
रमम कशमीि Jammu amp Kashmir 1767 1414 353 200 19593 15868 3725 190
परजब Punjab 3585 3585 0 00 55288 55275 13 00
िजरसथजन Rajasthan 6774 6770 4 01 79826 79637 189 02
उतति परिश Uttar Pradesh 8754 8691 63 07 117101 116118 984 08
उततिजखड Uttarakhand 1067 1067 0 00 13845 13753 92 07
उततरी कषतर Northern Region 28464 28041 423 15 383028 377776 5251 14
छततीसगढ़ Chhattisgarh 2464 2457 8 03 26130 26076 54 02
गरिजत Gujarat 9890 9890 0 00 116588 116572 15 00
मधय परिश Madhya Pradesh 6236 6236 0 00 75667 75665 2 00
महजिजषटर Maharashtra 13631 13631 0 00 158285 158148 137 01
िमन औि दिउ Daman amp Diu 221 221 0 00 2557 2557 0 00
िजिि व नगि हवली Dadra amp Nagar Haveli 553 553 0 00 6317 6317 0 00
गोवज Goa 362 362 0 00 4283 4280 3 01
पशचिमी कषतर Western Region 33357 33349 8 00 389827 389615 212 01
आनधर परिश Andhra Pradesh 6072 6071 1 00 63735 63677 58 01
तलगजनज Telangana 6930 6929 1 00 66697 66635 62 01
कनजाटक Karnataka 7614 7612 1 00 71759 71690 69 01
किल Kerala 2489 2488 1 00 25029 24911 118 05
तममल नजड Tamil Nadu 10247 10245 2 00 109375 109273 102 01
पडचिी Puducherry 252 251 1 04 2761 2751 10 03
लकष-दवीप Lakshadweep 4 4 0 0 46 46 0 0
दकषकषणी कषतर Southern Region 33605 33597 8 00 339355 338938 417 01
बबहजि Bihar 2319 2318 1 00 30052 29827 225 07
िजमोिि घजटी ननगम DVC 1773 1772 1 00 22365 21995 369 17
झजिखणड Jharkhand 698 697 1 01 8682 8461 221 25
ओडडशज Odisha 2583 2582 1 00 31810 31781 30 01
पशशचम बगजल West Bengal 4585 4584 2 00 52237 52078 159 03
मसशककम Sikkim 41 41 0 00 513 512 0 01
अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 67 346 323 23 67
परवी कषतर Eastern Region 11999 11995 5 00 145658 144654 1004 07
अरणजचल परिश Arunachal Pradesh 61 60 0 06 864 855 9 10
असम Assam 680 656 23 34 9532 9204 328 34
मणणपि Manipur 68 68 1 09 916 906 10 11
मघजलय Meghalaya 173 173 0 03 1955 1953 1 01
ममज़ोिम Mizoram 50 49 0 09 668 661 8 12
नजगजलड Nagaland 58 57 1 20 902 809 93 103
बिपिज Tripura 150 150 0 00 1859 1837 21 11
उततर-परवी कषतर North-Eastern Region 1240 1214 26 21 16696 16225 471 28
समपणण भारत All India 108665 108196 469 04 1274564 1267209 7355 06
Note The revised data for March 2019 is not avaliable
Excludes energy exported to Bangladesh
राजयState
ऊराण वरवदयत आपरत ण शथिरत ररपोरण (परवाणरवलोकन) Energy Power Supply Position Report (Provisional)
25
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
Energy not Supplied Energy not Supplied
मािण2019 March2019 अपरल2018 -मािण2019 April2018 to March2019
ऊरजा पनत ा म कमी ऊरजा पनत ा म कमी
अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met
कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )
चडीगढ़ Chandigarh 223 223 0 00 369 369 0 00
दिलली Delhi 4016 4016 0 00 7016 7016 0 00
हरियजणज Haryana 6544 6544 0 00 10270 10270 0 00
दहमजचल परिश Himachal Pradesh 1683 1683 0 00 1700 1700 0 00
रमम कशमीि Jammu amp Kashmir 3277 2622 655 200 3277 2622 655 200
परजब Punjab 6564 6564 0 00 12638 12638 0 00
िजरसथजन Rajasthan 11885 11885 0 00 13276 13276 0 00
उतति परिश Uttar Pradesh 16220 16220 0 00 20498 20062 436 21
उततिजखड Uttarakhand 2002 2002 0 00 2216 2216 0 00
उततरी कषतर Northern Region 47925 47356 569 12 63166 61726 1440 23
छततीसगढ़ Chhattisgarh 4444 4128 316 71 4444 4270 174 39
गरिजत Gujarat 16263 16263 0 00 17053 16963 90 05
मधय परिश Madhya Pradesh 12328 12323 5 00 13815 13815 0 00
महजिजषटर Maharashtra 22361 22291 70 03 23864 23254 610 26
िमन औि दिउ Daman amp Diu 336 336 0 01 357 356 1 02
िजिि व नगि हवली Dadra amp Nagar Haveli 800 799 1 01 816 815 1 01
गोवज Goa 538 538 0 00 596 596 0 00
पशचिमी कषतर Western Region 53132 52965 167 03 56675 55821 853 15
आनधर परिश Andhra Pradesh 8977 8977 0 00 9459 9453 6 01
तलगजनज Telangana 10471 10471 0 00 10815 10815 0 00
कनजाटक Karnataka 12841 12841 0 00 12841 12841 0 00
किल Kerala 4264 4228 36 09 4264 4228 36 09
तममल नजड Tamil Nadu 15712 15712 0 00 15712 15712 0 00
पडचिी Puducherry 427 412 15 34 427 412 15 34
लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0
दकषकषणी कषतर Southern Region 49464 49464 0 00 49464 49464 0 00
बबहजि Bihar 4633 4633 0 00 5115 5084 31 06
िजमोिि घजटी ननगम DVC 3035 3035 0 00 3035 3035 0 00
झजिखणड Jharkhand 1210 1210 0 00 1339 1291 48 36
ओडडशज Odisha 4827 4827 0 00 5357 5357 0 00
पशशचम बगजल West Bengal 8287 8287 0 00 9130 9123 7 01
मसशककम Sikkim 100 100 0 00 106 106 0 00
अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7
परवी कषतर Eastern Region 21658 21658 0 00 23141 22733 408 18
अरणजचल परिश Arunachal Pradesh 133 131 2 15 138 138 0 01
असम Assam 1539 1508 31 20 1865 1809 56 30
मणणपि Manipur 204 199 5 25 219 216 3 12
मघजलय Meghalaya 357 357 0 00 374 372 1 04
ममज़ोिम Mizoram 108 105 3 28 121 119 2 17
नजगजलड Nagaland 127 125 2 16 156 138 18 116
बिपिज Tripura 249 249 0 00 298 293 5 17
उततर-परवी कषतर North-Eastern Region 2540 2535 5 02 2967 2850 117 39
समपणण भारत All India 169464 168745 719 04 177022 175528 1494 08
Note The revised data for March 2019 is not avaliable 26
अधिकतम वरवदयत आपरत ण शथिरत ररपोरण (परवाणरवलोकन) Peak Power Supply Position Report (Provisional)
आकड़ मगज वजट नट Figures in MW net
राजयStateमािण2019 March2019 अपरल2018 -मािण2019 April2018 to March2019
मजग की पनत ा म कमी मजग की पनत ा म कमी Demand not MetDemand not Met
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
Excludes the supply to Bangladesh
अपरल 2019 April2019 अपरल2018 -मािण2019 April2019 to April2019
उततरी कषतर Northern Region
चडीगढ़ Chandigarh(Data Not Received)दिलली Delhi
हरियजणज Haryana
दहमजचल परिश Himachal Pradeshरमम कशमीि Jammu amp Kashmir(Data
Not Received)परजब Punjab
िजरसथजन Rajasthanउतति परिश Uttar Pradesh
उततिजखड Uttarakhand
पशचिमी कषतर Western Region
छततीसगढ़ Chhattisgarh
Apr-Nov 2018- No cuts
Maximum Demand cut-58MW
Energy cut- 00020-00032 MUsday
गरिजत Gujarat
मधय परिश Madhya Pradesh
महजिजषटर Maharashtra
गोवज Goa
दकषकषणी कषतर Southern Region
आनधर परिश Andhra Pradesh
तलगजनज Telangana
कनजाटक Karnataka
किल Kerala
तममल नजड Tamil Nadu
पडचिी Puducherryपरवी कषतर Eastern Region
बबहजि Bihar
झजिखणड Jharkhand
ओडडशज Odisha
पशशचम बगजल West Bengal
No N
otifie
d Cu
ts
27
मािण 2019 म इडथरीर पर वरवदयत करौती का वरवरवरण Notified Power CutsRestrictions on Industries during April2019
राजय कषतर State Regionऊराणमाग करौती EnergyDemand Cut
No N
otifie
d Cu
tsNo
Notifie
d Cu
ts
अपरल2019 April 2019 अपरल2019 -अपरल2019 April2019 to April2019
उततरी कषतर Northern Region
चडीगढ़ Chandigarh Data not received Data not received
दिलली Delhi Data not received Data not received
हरियजणज Haryana 0811 hrsday 0811 hrsday
दहमजचल परिश Himachal Pradesh HPSEBL has only 2 agriculture consumers and uninterrupted
power is being supplied to agriculture sector
HPSEBL has only 2 agriculture consumers and uninterrupted
power is being supplied to agriculture sector
रमम कशमीि Jammu amp Kashmir Data not received Data not received
परजब Punjab 379 hrsday 379 hrsday
िजरसथजन Rajasthan 0630 hrsday 0630 hrsday
उतति परिश Uttar Pradesh 2157 hrsday 2157 hrsday
उततिजखड Uttarakhand 2359 hrsday 2359 hrsday
पशचिमी कषतर Western Region
छततीसगढ़ Chhattisgarh 18 hrsday 18 hrsday
गरिजत Gujarat 8 hrsday 8 hrsday
मधय परिश Madhya Pradesh Three-Phase Supply(Irrigation)- 0953 hrs day Three-Phase
(Mixed) Supply - 2334 hrs day
Three-Phase Supply(Irrigation)- 0953 hrs day Three-Phase
(Mixed) Supply - 2334 hrs day
महजिजषटर Maharashtra Three-Phase Supply(Irrigation)- 9 hrs day Three-Phase Supply(Irrigation)- 9 hrs day
गोवज Goa No restriction No restriction
दकषकषणी कषतर Southern Region
आनधर परिश Andhra Pradesh 07 hrsday 07 hrsday
तलगजनज Telangana 24 hrsday 24 hrsday
कनजाटक Karnataka 6 hrsday 6 hrsday
किल Kerala No Restrictions No Restrictions
तममल नजड Tamil Nadu 9 hrsday (6 hrs during day time and 3 hrs during night time) 9 hrsday (6 hrs during day time and 3 hrs during night time)
पडचिी Puducherry No Restrictions No Restrictions
परवी कषतर Eastern Region
बबहजि Bihar 18 hrsday 18 hrsday
झजिखणड Jharkhand 20 hrsday 20 hrsday
ओडडशज Odisha 24 hrsday 24 hrsday
पशशचम बगजल West Bengal 23 hrsday 23 hrsday
28
मारच 2019 कषि कषतर को षिदयत आपरतच का षििरण Power Supply to Agricultural Sector during March2019
राजय कषतर State Regionऔसत वरवदयत आपरत ण घनरो म Average Hours of Supply
On segregated feeders
SNo Contents Page
1 Growth of Installed Capacity since 6th Plan 29
2 Progress of Transmission Sector since 6th Plan 30
3 All India Yearly Coal consumption for Power Generation (Utilities)
4 All India Annual Per Capita Consumption of Electricity since -2006
5 Average cost of power supply amp Average realisation (Paisakwh)
6 Growth of Rural Electrification amp Pump Sets Energisation
7 Status of Hydro Schemes Cleared by the CEA in Apr-2019
Section G - Growth of Power Sector
31
32
(In MW)
Coal Gas Diesel Total
End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472
End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634
End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537
End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596
End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921
End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703
End of 12th Plan 19216288 2532938 83763 21832988 6780 4447842 50018 31960630
Up to Apr-2019 20070450 2493722 63763 22627934 678000 4539922 7764163 35610019
Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-17) = 51529 MW
Electricity Generation (MU) Targets and Achievements for 2016-17
Coal Gas Diesel Nuclear Hydro Res Total
2007045 2493722 637629 678000 453992 77641625 22925174
29
1 Growth of Installed Capacity Since 6th Plan
Plan YearThermal
Nuclear Hydro RES (MNRE) Total
2007045
2493722637629
678000
4539922
77641625
Total Installed Capacity 35610019 MW
Coal Gas Diesel Nuclear Hydro Res
Progress of Transmission Sector in the Country up to April 2019
1 TRANSMISSION LINES (All fig in CKM)
At the end of
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
6th plan 0 0 0 0 0 0 0 0 0 0 0 0 1831 4198 0 6029 1641 44364 0 46005 3472 48562 0 52034
7th plan 0 0 0 0 0 0 0 0 0 0 0 0 13068 6756 0 19824 4560 55071 0 59631 17628 61827 0 79455
8th plan 0 0 0 0 1634 0 0 1634 0 0 0 0 23001 13141 0 36142 6564 73036 0 79600 31199 86177 0 117376
9th plan 0 0 0 0 3234 1504 0 4738 751 409 0 1160 29345 20033 0 49378 8687 88306 0 96993 42017 110252 0 152269
10th plan 0 0 0 0 4368 1504 0 5872 1775 409 0 2184 48708 24730 0 73438 9444 105185 0 114629 64295 131828 0 196123
11th Plan 0 0 0 0 5948 1504 1980 9432 4839 411 0 5250 71023 30191 5605 106819 10140 125010 830 135980 91950 157116 8415 257481
12th Plan 6124 0 0 6124 5948 1504 1980 9432 25465 1177 4598 31240 92482 48240 17065 157787 11014 151276 978 163268 141033 202197 24621 367851
13th Plan (Up
to Mar2019)6124 0 0 6124 5948 1504 1980 9432 33692 1512 6605 41809 101335 58238 21173 180746 11734 162552 1010 175296 158833 223806 30768 413407
13th Plan (Up
to Apr-19)6124 0 0 6124 5948 1504 1980 9432 33745 1512 6605 41862 101335 58258 21173 180766 11734 162953 1010 175697 158886 224227 30768 413881
27150 600 MW of 132 kV Inter-Regional power transmission capacity links which are operated radially from time to time is not added in the total
75050
47900
24000
99050
30
Grand Total
Note - The figure upto the end of 10th plan in for stringing progress including the lines not commissioned Now only commissioned lines are reckoned Accordingly the figure for 10th plan (end) may read
as 187555 after adjusting with (-) 10852 Ckm
Inter-regional Power Transfer Capacity (MW)
plusmn 800 kV HVDC plusmn 500 kV HVDC 765 kV 400 kV 220 kV
IR addition in 12th
Plan (up to March
2017)
Inter-regional
Transmission
Capacity at the end
of Plan Period 2017-
22 (as on April19)
IR at the end of 11th
PlanIR at the end of 12th
Plan
IR Capacity Addition
at the end of Plan
Period 2017-22 (Till
April 19)
2004-05 27800
2005-06 28100
2006-07 30200
2007-08 33000
2008-09 35500
2009-10 36700
2010-11 38700
2011-12 41756
2012-13 45460
2013-14 48940
2014-15 53040
2015-16 54590
2016-17 57430
2017-18 60800
2018-19 62890
Year
2005-06
2006-07
2007-08
2008-09
2009-10
2010-11
2011-12
2012-13
2013-14
2014-15
2015-16
2016-17
2017-18
2018-19
2004-05 254 209 7568
2005-06 260 221 7636
2006-07 276 227 7423
2007-08 293 239 7727
2008-09 340 263 8713
2009-10 355 268 8870
2010-11 398 303 11975
2011-12 455 330 13514
2012-13 501 376 14867
2013-14 518 175
2014-15 520
Source- PFC Reports on the performance of State Power Utilities 31
1181
7335
7786
91441
8188
88363
957
1010
1075
1122
1149
(GrossGen+ Net Import) Mid-year population Provisional
5 Average cost of power supply amp average realization ( paiseKWH )
Yearcost of supply
(paiseunit)
Realization(paiseunit)
Including AgricultureOnly
Agriculture
6719
7171
3 All India yearly Coal Consumption for Power Generation (Utilities)
YEARCoal Consumption
Million Tonnes
4 All India Annual per Capita consumption of Electricity Since 2006
Per Capita Consumption ( kWh)
6314
Sl
NoExecuting Agency
Installed
Capacity (MW)Cost (Rs crore)
Date of
Clearance
32
Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as
Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received
from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made
available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified
villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is
independent of the earlier published reports
No Hydro Electric Project has been issued concurrenceAppraisal letter by CEA during April 2019
7 Status of Hydro Schemes Cleared by the CEA in Apr-2019
Name of Scheme
1999-002000-01
297594
010408 to 310309010409 to 310310
10th Plan
2005-062006-07
322968331020
6 Growth Of Rural Electrification amp Pumpsets Energisation
Plan Year
9th Plan2002-03
134092626
4111
Pump Sets Energised Villages Electricfied (Nos)
2001-02
284064367244
1218
27801997-981998-99
3207
482864
12632
1576036
4451722594
15455554
2314176
397343611750
2093311060316074
65109527813884
46708
18423975
499150
2003-042004-05
5743
9769
Cumu upto End of 10th Plan
010407 to 310308
010410 to 310311557976840909
010411 to 310312
412667
86293726
No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification
since 2004-05
65291374575 296361511th Plan
Cumu upto End of 11th Plan
596556 21212860
557439Cummulative up to end of 12th Plan
SN Contents Page
1 Rate of sale of power for the year 2016-17 33-41
RATE OF SALE OF POWER FOR THE YEAR 2016-17
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) NORTHERN REGION
CENTRAL SECTOR
BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 18000 66900 19800
CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 54000 222400 21600
CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 30000 144400 19600
CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 23100 91700 42600
PARBATI - III HPS NHPC LTD HYDRO-HYDRO 52000 68200 54800
DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 28000 95600 30000
CHUTAK NHPC LTD HYDRO-HYDRO 4400 22000 79800
DULHASTI HPS NHPC LTD HYDRO-HYDRO 39000 228000 56400
SALAL HPS NHPC LTD HYDRO-HYDRO 69000 342300 11000
TANAKPUR HPS NHPC LTD HYDRO-HYDRO 9420 43000 29600
URI HPS -I NHPC LTD HYDRO-HYDRO 48000 280300 16000
URI HPS - II NHPC LTD HYDRO-HYDRO 24000 147300 48600
NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 4500 24600 88200
SEWA - II NHPC LTD HYDRO-HYDRO 12000 47100 43400
ANTA CCPP NTPC LTD THERMAL-GASN 41930 67539 32400
AURAIYA CCPP NTPC LTD THERMAL-GASN 66336 53501 39100
BADARPUR TPS NTPC LTD THERMAL-COAL 70500 159153 44800
DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 84000 296170 42300
DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 98000 526686 46300
DADRI CCPP NTPC LTD THERMAL-GASHSD 82978 227469 33000
FARIDABAD CCPP NTPC LTD THERMAL-GASN 43159 115577 30800
RIHAND STPS I NTPC LTD THERMAL-COAL 100000 596766 24500
RIHAND STPS II NTPC LTD THERMAL-COAL 100000 737069 24600
RIHAND STPS III NTPC LTD THERMAL-COAL 100000 706546 30600
SINGRAULI STPS NTPC LTD THERMAL-COAL 200000 1394068 20400
TANDA TPS NTPC LTD THERMAL-COAL 44000 295438 40800
UNCHAHAR TPS I NTPC LTD THERMAL-COAL 42000 256454 39800
UNCHAHAR TPS II NTPC LTD THERMAL-COAL 42000 273577 38900
UNCHAHAR TPS III NTPC LTD THERMAL-COAL 21000 142780 43000
KOLDAM NTPC LTD HYDRO-HYDRO 80000 363260 43600
NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 303575 25841
RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 108000 668677 35374
NJHPS SJVNL HYDRO-HYDRO 150000 699496 23820
RAMPUR HPS SJVNL HYDRO-HYDRO 41202 195982 32260
TEHRI HPP THDC HYDRO-HYDRO 100000 272543 51800
KOTESHWAR HEP THDC HYDRO-HYDRO 40000 106244 53400
IGSTPS JHAJJAR ARAVALI P CPL THERMAL-COAL 150000 510429 49490
NEYVELI BARSINGSAR NEYVELI LIG CORP LTD THERMAL-LIG 25000 127520 38040
STATE SECTOR
PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 21000 14222 48200
PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 21000 19205 48400
PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 25000 102257 42600
PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 25000 62107 41800
DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 60000 312213 41000
RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 120000 35767442200
WYC HYDEL STATION HPGCL HYDRO-HYDRO 6240 20365 24900
GIRI POWER HOUSE HPSEB HYDRO-HYDRO 6000 13958 7600
ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 1695 5467 11900
BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 12000 18528 6700
GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 2250 7462 22500
BASSI POWER HOUSE HPSEB HYDRO-HYDRO 6600 29649 7500
BINWA POWER HOUSE HPSEB HYDRO-HYDRO 600 2749 19300
ANNEXURE-I
RATE OF SALE OF POWER FOR THE YEAR 2016-2017
Page 33
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) GAJ POWER HOUSE HPSEB HYDRO-HYDRO 1050 2914 26700
BANER POWER HOUSE HPSEB HYDRO-HYDRO 1200 2864 16200
HOLI POWER HOUSE HPSEB HYDRO-HYDRO 300 616 22500
THIROT POWER HOUSE HPSEB HYDRO-HYDRO 450 1126 22500
KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 1200 3064 22500
LARJI POWER HOUSE HPSEB HYDRO-HYDRO 12600 53677 23700
NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 250 750 31000
CHABA POWER HOUSE HPSEB HYDRO-HYDRO 175 465 23300
RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 150 101 13400
SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 200 000 22500
KILLAR HPSEB HYDRO-HYDRO 030 050 22500
BHABA AUGUMENP H HPSEB HYDRO-HYDRO 450 1276 22500
BS CHAMBA HPSEB HYDRO-HYDRO 045 099 19500
GUMMA HPSEB HYDRO-HYDRO 300 423 22500
GAS TURBINE POWER STATION IPGCL THERMAL-GAS 27000 67233 39300
PPS-I PPCL THERMAL-GAS 33000 175905 38300
PPS-III PPCL THERMAL-GAS 137120 196879 36100
LOWER JHELUM JampKPDD HYDRO-HYDRO 10500 60214 5100
UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 2260 10514 6300
UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 10500 44202 8500
GANDHARBAL JampKPDD HYDRO-HYDRO 1500 8925 4700
KARNAH MPH JampKPDD HYDRO-HYDRO 200 1122 31000
CHENANI I JampKPDD HYDRO-HYDRO 2330 10892 6600
CHENANI II JampKPDD HYDRO-HYDRO 200 1188 9300
CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 750 3634 14200
IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 375 2108 18500
IGO MERCHELLONG JampKPDD HYDRO-HYDRO 300 1572 29700
PAHALGAM MHP JampKPDD HYDRO-HYDRO 450 1713 32900
MARPACHOO JampKPDD HYDRO-HYDRO 075 375 29800
HAFTAL JampKPDD HYDRO-HYDRO 100 483 28700
SANJAK JampKPDD HYDRO-HYDRO 126 441 36000
SEWA-III JampKPDD HYDRO-HYDRO 900 3273 20200
BHADERWAH JampKPDD HYDRO-HYDRO 150 935 8900
BAZGO JampKPDD HYDRO-HYDRO 030 108 33300
SUMOOR JampKPDD HYDRO-HYDRO 010 045 35400
HUNDER JampKPDD HYDRO-HYDRO 040 176 26200
STAKNA JampKPDD HYDRO-HYDRO 400 1933 4100
KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 124000 662879 31360
SURATGARH TPS RRVUNL THERMAL-COAL 150000 402328 41730
CHHABRA TPS 1amp 2 RRVUNL THERMAL-COAL 50000 305946 36700
CHHABRA TPS 3 RRVUNL THERMAL-COAL 25000 151536 36700
CHHABRA TPS 4 RRVUNL THERMAL-COAL 25000 155896 36700
RAMGARH GT POWER PROJECT RRVUNL THERMAL-COAL 22050 43177 41800
RAMGARH GAS T P PROJECT 3 RRVUNL THERMAL-GAS 5000 93615 41800
DHOLPUR C C POWER PROJECT RRVUNL THERMAL-R-LNG 33000 9486 46110
MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 14000 20855 34192
MINI MICRO HYDEL (MMH) P S RRVUNL HYDRO-HYDRO 2385 851 37800
KALISINDH TPP 1 RRVUNL THERMAL-COAL 60000 341543 45000
KALISINDH TPP 2 RRVUNL THERMAL-COAL 60000 211588 45000
KHARA HEP UPJVNL HYDRO-HYDRO 7200 26654 7200
MATATILLA HEP UPJVNL HYDRO-HYDRO 3060 12219 6500
OBRA HEP UPJVNL HYDRO-HYDRO 9900 21517 6300
RIHAND UPJVNL HYDRO-HYDRO 30000 57369 5500
ANPARA A TPS UPRVUNL THERMAL-COAL 63000 317536 27000
ANPARA B TPS UPRVUNL THERMAL-COAL 100000 705605 22700
ANPARA D UPRVUNL THERMAL-COAL 100000 300158 39800
HARDUAGANJ TPS UPRVUNL THERMAL-COAL 16500 45817 49200
HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 50000 304389 46600
OBRA A TPS UPRVUNL THERMAL-COAL 28800 13158 34000
OBRA B TPS UPRVUNL THERMAL-COAL 100000 328124 21900
Page 34
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) PANKI TPS UPRVUNL THERMAL-COAL 21000 66488 50300
PARICHHA TPS UPRVUNL THERMAL-COAL 22000 38762 49400
PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 42000 231931 45600
PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 50000 276722 50400
CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 24000 70845 8290
CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 14400 75366 8390
DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 3375 9595 12080
DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 5100 18701 10520
KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4140 17359 12330
KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 12000 33001 9420
KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 3000 11953 8320
TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 9000 33983 12460
MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 30400 124510 16110
RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 19800 17897 10550
MPUR UTTARAKHAND JVNL HYDRO-HYDRO 930 5121 19200
PATHRI UTTARAKHAND JVNL HYDRO-HYDRO 2040 11636 14200
GALOGI UTTARAKHAND JVNL HYDRO-HYDRO 300 648 12500
PRIVATE SECTOR
MGTPP CLP INDIA PVT LTD THERMAL-COAL 132000 268902 41940
SHRINAGAR HEP ALAKNANDA HPCL HYDRO-HYDRO 33000 127414 48800
GAMA INFRAPROP CCPP GAMA INFRAPROP PVT THERMAL-GAS 22500 52686 47000
PPGCL (BARA) JP POWER VENTURES LTD THERMAL-COAL 198000 448200 38500
MALANA HEP MALANA PCL HYDRO-HYDRO 8600 26354 29792
MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 10000 30369 32580
ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 19200 56347 36079
KASHANG HEP H P PCL HYDRO-HYDRO 19500 5034 29200
BASPA-II HEP HBPCL HYDRO-HYDRO 30000 132769 13600
KARCHAM WANGTOO HEP HBPCL HYDRO-HYDRO 100000 434386 36600
RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 108000 582600 43700
RITHALA COMBI CY POWER PLANT TATA POWER DDL THERMAL-GAS 9480 000 11900
RAJPURA TPS NABHA POWER LTD THERMAL-GAS 140000 901484 39000
TALWANDI SABO POWER LTD TALWANDI SABO POWER LTD THERMAL-COAL 198000 636040 49548
ROJA THERMAL POWER STATION ROJA POWER SCL THERMAL-COAL 120000 727200 43400
KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 34400 63400
BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 36000 62600
MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 38200 60800
UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 37900 61500
KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 42300 58800
LALITPUR PGCL BAJAJ ENERGY PVT LTD THERMAL-COAL 198000 359400 47300
PRAYAGRAJ PGCL PRAYAGRAJ PGCL THERMAL-COAL 132000 448200 38595
KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 132000 783182 33438
WESTERN REGION
CENTRAL SECTOR
INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 100000 325333 23892
OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 52000 141663 34001
GANDHAR CCPP NTPC LTD THERMAL-GAS 65739 221924 28700
KAWAS CCPP NTPC LTD THERMAL-GASN 65620 167929 27000
KORBA I amp II NTPC LTD THERMAL-COAL 210000 1499171 20500
KORBA III NTPC LTD THERMAL-COAL 50000 358746 26600
SIPAT STPS I NTPC LTD THERMAL-COAL 198000 1479902 26800
SIPAT STPS II NTPC LTD THERMAL-COAL 100000 766549 26500
VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 126000 693142 25800
VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 100000 608781 23800
VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 100000 673475 27600
VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 100000 655924 32900
VINDHYACHAL STPS V NTPC LTD THERMAL-COAL 50000 328265 31700
MOUDA I NTPC LTD THERMAL-COAL 100000 343130 44500
MOUDA Ii NTPC LTD THERMAL-COAL 66000 40637 39900
RATNAGIRI GAS amp POWER PVT LTD RGPPL THERMAL-GAS 196708 442485 47000
KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 000 24729
TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 32000 201227 10740
Page 35
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 365122 19069
TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 787444 29324
STATE SECTOR
GSEG-HAZIRA15610 MW GUJARAT S ENEGEN LTD THERMAL-GAS 15610 1805 28200
GSEG-HAZIRA35143 MW GUJARAT S ENEGEN LTD THERMAL-GAS 35130 22276 51300
GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 21978 51800
AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 13929 26100
KORBA TPS EAST CSPGCL THERMAL-COAL 44000 198673 33880
DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 365808 27570
KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 316500 30420
HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 532878 19410
CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 515 58300
MTTPS CHAMPA U-I CSPGCL THERMAL-COAL 50000 220376 39000
MTTPS CHAMPA U-II CSPGCL THERMAL-COAL 50000 23709 10000
SHP GANGREL CSPGCL HYDRO-HYDRO 1000 2350 36790
BANGO HEP CSPGCL HYDRO-HYDRO 12000 14662 8900
MHP KORBA WEST CSPGCL HYDRO-HYDRO 170 859 38190
SIKASAR HEP CSPGCL HYDRO-HYDRO 700 418 26870
DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8843 74500
DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 19446 51500
GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 66388 71600
GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127488 41300
KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 96072 43900
KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 29841 56400
SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 184966 58800
UKAI 1-5 GSECL THERMAL-COAL 85000 204891 46900
UKAI TPS 6 GSECL THERMAL-COAL 50000 284448 48200
WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 271999 58300
WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 82808 44100
KADANA HPS GSECL HYDRO-HYDRO 24200 34433 16800
UKAI HPS GSECL HYDRO-HYDRO 30500 40585 6100
TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 123000 11500
BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 8900 10900
BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 7200 27500
JHINNA HPS MPPGCL HYDRO-HYDRO 2000 9700 18500
RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 44300 3400
GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 17300 4600
SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 4100 16900
MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 14600 27000
PENCH HPS MPPGCL HYDRO-HYDRO 16000 23700 8100
RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 3000 16900
AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 134400 35100
SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 283800 38700
SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 344600 34300
SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 111600 61600
SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 211800 58000
SSTPS PH-I MPPGCL THERMAL-COAL 120000 233100 84300
BHUSAWAL TPS MSPGCL THERMAL-COAL 142000 566258 51100
CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1365682 33700
KHAPERKHEDA MSPGCL THERMAL-COAL 134000 706207 39100
KORADI TPS MSPGCL THERMAL-COAL 62000 443206 42000
NASIK TPS MSPGCL THERMAL-COAL 63000 297275 47000
PARLI TPS MSPGCL THERMAL-COAL 113000 175934 71600
PARAS MSPGCL THERMAL-COAL 50000 267931 38700
URAN CCPP MSPGCL THERMAL-GAS 67200 320330 30600
KOYANA MSPGCL HYDRO-HYDRO 195600 328155 13100
SMALL HYDRO POWER PLANTS MSPGCL HYDRO-HYDRO 45400 93062 30500
BHIRA MSPGCL HYDRO-HYDRO 8000 10046 8400
TILLARI MSPGCL HYDRO-HYDRO 8900 10584 3100
SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 233298 20500
SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 87633 20500
PRIVATE SECTOR
Page 36
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 81282 46750
JNSTPP(JAYPEE NIGRIE) JP POWER VENTURES LTD THERMAL-COAL 132000 726695 29310
MB POWER MB POWER THERMAL-COAL 120000 345632 38310
ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 754922 28671
ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 780761 23495
ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 198000 1263784 32090
ADANI POWER MAHARA ADANI POWER LTD THERMAL-COAL 330000 1666191 34124
AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 170065 36827
SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 252035 45129
ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 458551 36000
ESSAR POWER MP LTD ESSAR POWER MP LTD THERMAL-COAL 60000 243040 28600
VEDANTA LTD (P P -I) VEDANTA LTD THERMAL-GAS 3000 15044 24000
VEDANTA LTD (P P -II) VEDANTA LTD THERMAL-GAS 3000 21293 24000
PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 8234600 24000
165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 5850 64390
145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 68717 40349
SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 132655 28776
SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 144686 38567
MUNDRA UMPPCOASTAL GUJARAT POWER
LTD THERMAL-IMP COAL 400000 2530300
23900
LANCO AMARKANTAK TPP PATHADIH
U-ILANCO AMARKAN POWER LTD THERMAL-COAL 30000 195500
29200
LANCO AMARKANTAK TPP PATHADIH
U-IILANCO AMARKAN POWER LTD THERMAL-COAL 30000 206900
27600
BARADARHA TPS D B POWER LTD THERMAL-COAL 120000 677373 29200
JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 405000 28900
JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 453000 40500
DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 339437 40700
TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 293400 44000
TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 137200 37000
TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 174900 44000
BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 92900 14100
BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23700 34300
KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 27600 48300
CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2530300 23900
BHANDARDRA HEP -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 2475 54900
SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 161400 26500
SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 445000 39000
SOTHERN REGION
CENTRAL SECTOR
NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 325699 54820
NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 305532 39880
NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 998805 38510
NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 113016 54070
NEYVELI TAMILNADU POWER LTD JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 625274 42200
VALLUR TPS NTPC TECL THERMAL-COAL 150000 856438 42350
R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 1493 84300
RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1502919 29400
RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 341291 31800
SIMHADRI I NTPC LTD THERMAL-COAL 100000 688382 36800
SIMHADRI II NTPC LTD THERMAL-COAL 100000 663657 43400
KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 593110 31324
MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 291625 21764
KKNPP-1 amp 2 NPCIL NUCLEAR-NUCLEAR 200000 572609 40948
MINICOY LAKSHADEEP THERMAL-DIESEL 340 770 29600
KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1097 29600
AMINI LAKSHADEEP THERMAL-DIESEL 265 509 29600
ANDROTT LAKSHADEEP THERMAL-DIESEL 219 524 29600
KALPENI LAKSHADEEP THERMAL-DIESEL 175 356 29600
AGATTI LAKSHADEEP THERMAL-DIESEL 195 658 29600
KADMAT LAKSHADEEP THERMAL-DIESEL 190 414 29600
KILTAN LAKSHADEEP THERMAL-DIESEL 150 269 29600
CHETLET LAKSHADEEP THERMAL-DIESEL 100 139 29600
BITRA LAKSHADEEP THERMAL-DIESEL 043 024 29600
BANGARAM LAKSHADEEP THERMAL-DIESEL 018 009 29600
Page 37
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) STATE SECTOR
Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 721811 46500
Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 50000 336142 46500
RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 237358 46500
RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 239926 46500
RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 124500 46500
SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 62109 46500
UPPER SILERU APGENCO HYDRO-HYDRO 24000 33000 46500
LOWER SILERU APGENCO HYDRO-HYDRO 46000 81066 46500
DONKARAI APGENCO HYDRO-HYDRO 2500 6007 46500
PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 1262 46500
CHETTIPETA APGENCO HYDRO-HYDRO 100 214 46500
MUCHKUND APGENCO HYDRO-HYDRO 12000 37571 46500
NAGARJUNASAGAR RCPH APGENCO HYDRO-HYDRO 9000 606 46500
TUNGABHADRA HES amp HAMPI(AP
Share)
APGENCO HYDRO-HYDRO 7200 6100 46500
KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 352232 42600
KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 288131 32500
KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 319272 46500
RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 40073 44300
KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 308317 46000
KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 308963 51300
SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 61004 76600
NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 17960 75300
PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 20873 58300
POCHAMPAD-I TSPGENCO HYDRO-HYDRO 2700 5455 29800
POCHAMPAD-II TSPGENCO HYDRO-HYDRO 900 1932 40700
NIZAMSAGAR TSPGENCO HYDRO-HYDRO 1000 1126 53400
RAICHUR TPS 1 to 7 KPCL THERMAL-COAL 147000 890866 43800
RAICHUR TPS 8 KPCL THERMAL-COAL 25000 159523 48200
BELLARI TPS 1 KPCL THERMAL-COAL 50000 318679 51100
BELLARI TPS 2 KPCL THERMAL-COAL 50000 232347 55600
BELLARI TPS 3 KPCL THERMAL-COAL 70000 47565 34400
BHADRA PH KPCL HYDRO-HYDRO 3920 2369 45900
GERUSUPPA PH KPCL HYDRO-HYDRO 24000 26990 22000
GHAT PRABHA HEP KPCL HYDRO-HYDRO 3200 4777 25300
KADRA HPS KPCL HYDRO-HYDRO 15000 16889 26800
NAGJHARI KPCL HYDRO-HYDRO 90000 155159 9800
KODASALLI DPH KPCL HYDRO-HYDRO 12000 14854 19200
MUNIRA+MGH+SPH+SPH KPCL HYDRO-HYDRO 22640 48211 7900
SHARAVATHY HPS KPCL HYDRO-HYDRO 108550 276215 5400
ALMATTI DPH KPCL HYDRO-HYDRO 29000 39611 24600
VARAHI UGPH KPCL HYDRO-HYDRO 46000 71368 15600
IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 17196 15300
IDUKKI HPS KSEB HYDRO-HYDRO 78000 137905 15300
KAKKAD HPS KSEB HYDRO-HYDRO 5000 13063 15300
KALLADA HPS KSEB HYDRO-HYDRO 1500 4436 15300
KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 46544 15300
KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 635 15300
LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 30822 15300
MALANKARA HPS KSEB HYDRO-HYDRO 1050 2474 15300
MATTUPETTY KSEB HYDRO-HYDRO 200 230 15300
MALAMPUZHA KSEB HYDRO-HYDRO 250 063 15300
CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 864 15300
URUMI ST I amp II KSEB HYDRO-HYDRO 615 903 15300
LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 248 15300
NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7765 19625 15300
PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 16601 15300
PANNIAR HPS KSEB HYDRO-HYDRO 3240 6217 15300
PORINGALKUTHU KSEB HYDRO-HYDRO 3600 10052 15300
PORINGALKUTHU LBE KSEB HYDRO-HYDRO 1600 9438 15300
PEPPARA KSEB HYDRO-HYDRO 300 395 15300
POOZHITHODE KSEB HYDRO-HYDRO 480 1045 15300
Page 38
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) PEECHI KSEB HYDRO-HYDRO 125 040 15300
RANI-PERUNADU KSEB HYDRO-HYDRO 400 585 15300
SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 79783 15300
SENGULAM HPS KSEB HYDRO-HYDRO 5120 11558 15300
SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 16711 15300
VILANGAD KSEB HYDRO-HYDRO 750 1578 15300
BARAPOLE KSEB HYDRO-HYDRO 1500 1932 15300
VELLATHOOVAL KSEB HYDRO-HYDRO 360 305 15300
CHIM0NY KSEB HYDRO-HYDRO 250 156 15300
ADYANPARA KSEB HYDRO-HYDRO 350 501 15300
BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 554 15300
KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 3801 15300
KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 23132 32800
ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 14416 62280
METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 523970 62280
METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 321270 62280
NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 336575 62280
NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 591240 62280
TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 508966 62280
KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 30897 62280
VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 18720 90699 62280
KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 33593 62280
BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 1047 62280
PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 1250 62280
PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 330 62280
MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 4897 62280
MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 032 62280
KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15681 62280
KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 40608 62280
KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 21342 62280
KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 4717 62280
KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4322 62280
KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2399 62280
METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 4416 62280
METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 8035 62280
BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2187 62280
BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2359 62280
BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2511 62280
BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 1949 62280
BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 1819 62280
POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 172 62280
SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 241 62280
MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 026 62280
THIRUMOORTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 136 62280
PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 9309 62280
VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 353 62280
SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 4192 62280
PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 6571 62280
SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 1186 62280
SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6319 62280
ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 6122 62280
KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 28674 62280
SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 18381 62280
SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 4258 62280
KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 12680 62280
KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4201 62280
ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 000 62280
PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 19175 62280
AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 078 62280
BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 504 62280
BHAVANI KATTALAI (BKB)(IIIampIII BB I amp II)TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 5847 62280
PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 000 62280
Page 39
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) SRI DAMODARAM STPS APPDCL THERMAL-COAL 160000 808108 36300
PRIVATE SECTOR
KARUPPUR TANJORE LANCO TANJORE PCL THERMAL-GAS 12000 48096 28770
SIMHAPURI ENERGY LTD SIMHAPURI ENERGY LTD THERMAL-COAL 60000 143900 39100
JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 7111 45500
SBU 1 JSW ENERGY LTD
VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 26000 159100
43300
SBU 2 JSW ENERGY LTD
VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 60000 247900
42800
LANCO KPLLANCO KONDAPALLI POWER
LTDTHERMAL-GAS 36814 85060
25776
LANCO KPL STG -IILANCO KONDAPALLI POWER
LTDTHERMAL-GAS 36600 12979
46330
LANCO KPL STG -IIIALANCO KONDAPALLI POWER
LTDTHERMAL-GAS 37100 85710
46330
LANCO KPL STG -III BLANCO KONDAPALLI POWER
LTDTHERMAL-GAS 37100 43639
46330
HINDUJA NATIONAL PCL HINDUJA NATIONAL PCL THERMAL-COAL 104000 303000 38200
MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 121164 49940
UDUPI POWER COR LTD ADANI POWER LTD THERMAL-COAL 120000 754613 42500
SPECTRUM POWER GENERATION
LTD SPECTRUM PG LTD THERMAL-GASN 20525 9256812
34952
TAQA NEYVELI POWER COM PVT
LTD TAQA NEYVELI THERMAL-LIG 25000 5840
34500
ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 251000 51000
ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 207860 36800
GMR VEMAGIRI POWER GENERATION
LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 30117
46450
EASTERN REGION
CENTRAL SECTOR
MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 64675 53113
MTPS STAGE - II KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 39000 1432 69138
BOKARO `B` TPS DVC THERMAL-COAL 63000 145670 31539
MEJIA TPS U 1-3 DVC THERMAL-COAL 63000 348298 31552
MEJIA TPS U 4 DVC THERMAL-COAL 21000 116099 34997
MEJIA TPS U 5-6 DVC THERMAL-COAL 50000 276427 35976
MEJIA TPS U 7-8 DVC THERMAL-COAL 100000 552854 36991
DURGAPUR STEEL TPS DVC THERMAL-COAL 100000 665550 39323
DURGAPUR TPS DVC THERMAL-COAL 21000 59270 35416
RAGHUNATHPUR TPS DVC THERMAL-COAL 120000 201650 35326
MAITHON HYDEL STA DVC HYDRO-HYDRO 6320 12200 17984
CHANDRAPURA TPSU1-3 DVC THERMAL-COAL 42000 257610 35095
CHANDRAPURA TPSU7-8 DVC THERMAL-COAL 50000 306673 34987
KODERMA TPS DVC THERMAL-COAL 100000 380180 38131
PANCHET HPS DVC HYDRO-HYDRO 8000 13360 17984
TILLAYA HPS DVC HYDRO-HYDRO 400 1410 17984
RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34700 35400
TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 277300 23200
TLDP -III NHPC LTD HYDRO-HYDRO 13200 55400 62000
TLDP -IV NHPC LTD HYDRO-HYDRO 16000 60300 25600
FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 957219 33700
FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 308943 41000
BONGAINGAON TPS NTPC LTD THERMAL-COAL 25000 153663 58600
KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 542277 34200
KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 942591 34200
BARH-II NTPC LTD THERMAL-COAL 132000 728021 44500
TALCHER TPS NTPC LTD THERMAL-COAL 46000 335521 30100
TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 702319 25600
TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1436521 24700
STATE SECTOR
BTPS(RampM) BIHAR STATE PGCL THERMAL-COAL 22000 12142 39700
BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 98331 10602
HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 50593 9482
CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 19689 2605
RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 53192 6033
UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 147208 14637
Page 40
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 60353 4519
IB TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 288567 25000
J P H GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 210 038 61100
MEYONG CHU GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 400 1086 61100
TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 122667 38200
DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 214339 43321
KOLAGHAT THERMAL POWER
STATION
WEST BENGAL PDCL THERMAL-COAL 126000 538269 31603
BAKRESHWAR THERMAL POWER
PLANT
WEST BENGAL PDCL THERMAL-COAL 105000 634876 32154
BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 45000 166855 33299
SANTHALDIH THERMAL POWER
STATION
WEST BENGAL PDCL THERMAL-COAL 50000 336442 34932
SAGARDIGHI THERMAL POWER
PROJECT
WEST BENGAL PDCL THERMAL-COAL 160000 423121 34705
JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 20344 68900
RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 24559 68900
TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 4623 68900
PURULIA PUMPED STORAGE
PROJECT
WEST BENGAL SEDCL HYDRO-HYDRO 90000 108816 68900
MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2768 68900
PRIVATE SECTOR
CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 49474 20230
CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 555500 70200
HALDIA ENERGY HALDIA ENERGY LTD THERMAL-COAL 60000 371000 50400
DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3688 63400
KAMALANGA TPS GMR KAMALANGA ENERGY LTD THERMAL-COAL 105000547670
33300
ADHUNIK POWER U-1 ADHUNIK POWER THERMAL-COAL 27000 158 44060
ADHUNIK POWER U-2 ADHUNIK POWER THERMAL-COAL 27000 168 44250
VL-JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 332800 23622
JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 43000 45250
JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 71700 37030
JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 70700 35920
JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 71100 38870
JOJOBERA UNIT 5 TATA POWER COM LTD THERMAL-COAL 12000 79300 44560
JOJOBERA UNIT 6 TATA POWER COM LTD THERMAL-WHR 12000 83700 12840
IEL KALINGANAGAR U-I TATA POWER COM LTD THERMAL-WG 6750 33400 22500
IEL KALINGANAGAR U-II TATA POWER COM LTD THERMAL-WG 6750 34800 22500
MAITHON UNIT 1 amp 2 TATA POWER COM LTD THERMAL-COAL 105000 678000 36100
HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 27500 24340
HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 28400 24340
HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 15800 24310
NORTH EASTERN REGION
CENTRAL SECTOR
LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 74100 36600
AGARTALA GT NEEPCO THERMAL-GAS 13500 88611 27210
ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 153111 32310
DOYANG HEP NEEPCO HYDRO-HYDRO 7500 25598 49801
KOPILI HEP NEEPCO HYDRO-HYDRO 20000 98186 11491
KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 19582 20237
KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 10310 17968
RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 124093 22945
TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 10100 17344 39000
STATE SECTOR
HYDRO POWER (122 Stns) ITANAGAR GOVT OF ARUNACHAL
PRADESHHYDRO-HYDRO 6971 6217270
24600
KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39514 17337
LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 82327 36810
NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 33318 48290
MYNTRIANG SHEP ST II ASSAM POWER GENCO HYDRO-HYDRO 300 567 35776
LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 9130 49200
LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 012 49200
DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 022 49200
TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 000 49200
UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 4990 16000
UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 6476 37000
UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 16494 14600
UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 3600 9556 15000
SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 758 8000
MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44070 44800
KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 154 41400
TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 091 41400
MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 411 41400
MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 394 41400
KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 760 41400
SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 3264 41400
LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 044 41400
BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 18953 28000
ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 43585 28200
GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 4080 11100
Note
LIG Lignite N Naptha WHR Waste Heat Recovery
Page 41
(MW)
Cummulative
Deviation
Target Achievement Target Achievement (+) (-)
Central 6040 500 0 500 0 -500
State 425615 660 0 660 0 -660
Private 0 0 0 0 0 0
Total 1029615 1160 0 1160 0 -1160
Central 600 0 0 0 0 0
State 21099 0 0 0 0 0
Private 379 0 0 0 0 0
Total 118999 0 0 0 0 0
Nuclear Central 700 0 0 0 0 0
Central 7340 500 0 500 0 -500
State 446714 660 0 660 0 -660
Private 379 0 0 0 0 0
Total 1218614 1160 0 1160 0 -1160
Electricity Generation (MU) Targets and Achievements for 2016-17
13
Hydro
All India
Capacity Addition TargetsAchievements during the Month of Apr-2019
Thermal
2 Capacity Addition Targets Achievements During Apr-2019
Schemes Sector
Target 2019-20
Apr-19 to Apr-19Apr-19
11
60
0 0
11
60
0 0 0 0
0
200
400
600
800
1000
1200
1400
Thermal Hydro Nuclear Total
MW
Targets and Achievement during 2019-20Target Achievement
0
200
400
600
800
1000
1200
Thermal Hydro Nuclear Total
1160
0 0
1160
0 0 00
MW
Target Achievement
Coal Lignite Gas Diesel Total
State 1634400 25000 287920 000 1947320 000 869755 69956 2887031
Private 2168083 108000 55800 000 2331883 000 251400 1312046 3895329
Central 1233537 25000 234406 000 1492943 162000 849622 37900 2542465
Sub Total 5036020 158000 578126 000 5772146 162000 1970777 1419902 9324825
State 2156000 104000 284982 000 2544982 000 544650 54789 3144421
Private 3474567 50000 467600 000 3992167 000 48100 2186476 6226743
Central 1650295 000 328067 000 1978362 184000 162000 66630 2390992
Sub Total 7280862 154000 1080649 000 8515511 184000 754750 2307894 11762155
State 1993250 000 79198 28788 2101236 000 1177483 58688 3337407
Private 1187450 25000 532210 27370 1772030 000 000 3749140 5521170
Central 1123502 289000 35958 000 1448460 332000 000 54190 1834650
Sub Total 4304202 314000 647366 56158 5321726 332000 1177483 3862018 10693227
State 624000 000 10000 000 634000 000 353792 27511 1015303
Private 638700 000 000 000 638700 000 39900 111637 790237
Central 1483664 000 000 000 1483664 000 100520 1000 1585184
Sub Total 2746364 000 10000 000 2756364 000 494212 140148 3390724
State 000 000 49771 3600 53371 000 42200 23325 118895
Private 000 000 2450 000 2450 000 000 6104 8554
Central 77002 000 125360 000 202362 000 100500 3000 305862
Sub Total 77002 000 177581 3600 258183 000 142700 32429 433311
State 000 000 000 4005 4005 000 000 525 4530
Private 000 000 000 000 000 000 000 738 738
Central 000 000 000 000 000 000 000 510 510
Sub Total 000 000 000 4005 4005 000 000 1773 5778
State 6407650 129000 711871 36393 7284913 000 2987880 234793 10507586
Private 7468800 183000 1058060 27370 8737230 000 339400 7366140 16442770
Central 5568000 314000 723791 000 6605791 678000 1212642 163230 8659663
Total 19444450 626000 2493722 63763 22627934 678000 4539922 7764163 35610019
Figures at decimal may not tally due to rounding off
Note -
(As per latest information available with MNRE)
Break up of RES all India as on 31032019 is given below (in MW)
459315 3562597 2818071 7764163
A 0 MW
B Apr 2019 0 MW
C
Apr 2019 0 MW
D Net Capacity Added during Apr 2019 A-B-C 0 MW
Sector wise breakup of RES capacity as shown is provisional
Share of installed capacity of BBMB Stations is included in state sector of partner states
BM PowerCogen Waste to Energy
910350 13830
Capacity Added during Apr 2019
Capacity Retired during
Capacity removed due to change
from Conventional to RES during
Islands
ALL INDIA
Abbreviation- SHP=Small Hydro Project (le 25 MW) BP=Biomass Power UampI=Urban amp Industrial Waste Power RES=Renewable Energy Sources
1 RES include SHP BP UampI Solar and Wind Energy Installed capacity in respect of RES (MNRE) as on 31032019
Small
Hydro PowerWind Power
Bio-PowerSolar Power
Total
Capacity
RES
(MNRE)
Northern Region
Western Region
Southern Region
Eastern Region
North Eastern
Region
ALL INDIA INSTALLED CAPACITY (IN MW) OF POWER STATIONS
(As on 30042019)
(UTILITIES)
Region Ownership Sector
Mode wise breakup
Grand TotalThermalNuclear Hydro
Coal Lignite Gas Diesel Total
State 13500 000 180040 000 193540 000 000 000 193540
Private 86922 000 10800 000 97722 000 000 17889 115611
Central 311272 000 20701 000 331973 10283 72309 000 414565
Sub-Total 411694 000 211541 000 623235 10283 72309 17889 723716
State 272000 000 15000 000 287000 000 110282 6930 404212
Private 408078 000 000 000 408078 000 20000 34512 462590
Central 129472 000 53561 000 183034 10094 66370181 500 259998
Sub-Total 809550 000 68561 000 878112 10094 196652 41942 1126799
State 000 000 000 000 000 000 69460 25661 95121
Private 000 000 000 000 000 000 99200 62668 161868
Central 18340 000 6201 000 24541 2895 122388 000 149824
Sub-Total 18340 000 6201 000 24541 2895 291048 88329 406813
State 000 000 17500 000 17500 000 123000 12903 153403
Private 000 000 000 000 000 000 000 6483 6483
Central 50639 000 12907 000 63547 6798 109188 000 179533
Sub-Total 50639 000 30407 000 81047 6798 232188 19386 339419
State 176000 000 15000 000 191000 000 259770 12780 463550
Private 511550 000 000 000 511550 000 28800 115462 655812
Central 85458 000 26401 000 111859 19681 92342 000 223882
Sub-Total 773008 000 41401 000 814409 19681 380912 128242 1343244
State 626000 25000 60380 000 711380 000 109618 2385 823383
Private 280200 108000 000 000 388200 000 10400 730181 1128781
Central 95625 25000 22110 000 142735 55674 73901 34400 306710
Sub-Total 1001825 158000 82490 000 1242315 55674 193919 766966 2258874
State 546900 000 000 000 546900 000 72410 2510 621820
Private 871433 000 000 000 871433 000 84200 288760 1244393
Central 379639 000 54949 000 434588 28948 180253 3000 646789
Sub-Total 1797972 000 54949 000 1852921 28948 336863 294270 2513002
State 000 000 000 000 000 000 125215 6787 132002
Private 9900 000 45000 000 54900 000 8800 52620 116320
Central 34324 000 6966 000 41290 3124 47554 000 91968
Sub-Total 44224 000 51966 000 96190 3124 181569 59407 340290
State 000 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 000 3471 3471
Central 3815 000 1503 000 5317 801 10171 000 16289
Sub-Total 3815 000 1503 000 5317 801 10171 3471 19760
124953 000 29105 000 154058 23703 75145 000 252907
State 1634400 25000 287920 000 1947320 000 869755 69956 2887031
Private 2168083 108000 55800 000 2331883 000 251400 1312046 3895329
Central 1233537 25000 234406 000 1492943 162000 849622 37900 2542465
Grand Total 5036020 158000 578126 000 5772146 162000 1970777 1419902 9324825
Delhi
Haryana
Himachal Pradesh
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
NORTHERN REGION
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
(As on 30042019)
State Ownership Sector
Mode wise breakup
Grand TotalThermalNuclear Hydro
RES
(MNRE)
Jammu amp Kashmir
Punjab
Rajasthan
Uttar Pradesh
Uttarakhand
Chandigarh
Central - Unallocated
Total (Northern
Region)
(As on 30042019)
Coal Lignite Gas Diesel Total
State 000 000 000 000 000 000 000 005 005
Private 000 000 4800 000 4800 000 000 392 5192
Central 46959 000 1967 000 48926 2600 000 000 51526
Sub-Total 46959 000 6767 000 53726 2600 000 397 56723
State 000 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 000 1447 1447
Central 14141 000 4334 000 18475 700 000 000 19175
Sub-Total 14141 000 4334 000 18475 700 000 1447 20622
State 371000 104000 217782 000 692782 000 77200 6470 776452
Private 726567 50000 396000 000 1172567 000 000 833180 2005747
Central 324243 000 42400 000 366643 55900 000 24330 446873
Sub-Total 1421810 154000 656182 000 2231992 55900 77200 863980 3229072
State 540000 000 000 000 540000 000 170366 8396 718762
Private 617400 000 10000 000 627400 000 000 418040 1045440
Central 334238 000 25700 000 359938 27300 152000 30000 569238
Sub-Total 1491638 000 35700 000 1527338 27300 322366 456436 2333440
State 228000 000 000 000 228000 000 12000 1105 241105
Private 885000 000 000 000 885000 000 000 52430 937430
Central 211075 000 000 000 211075 4800 10000 000 225875
Sub-Total 1324075 000 000 000 1324075 4800 22000 53535 1404410
State 1017000 000 67200 000 1084200 000 285084 38813 1408097
Private 1245600 000 56800 000 1302400 000 48100 880441 2230941
Central 466780 000 227273 000 694053 69000 000 12300 775353
Sub-Total 2729380 000 351273 000 3080653 69000 333184 931553 4414390
State 000 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 000 546 546
Central 19560 000 6634 000 26194 900 000 000 27094
Sub-Total 19560 000 6634 000 26194 900 000 546 27640
233300 000 19759 000 253059 22800 000 000 275859
State 2156000 104000 284982 000 2544982 000 544650 54789 3144421
Private 3474567 50000 467600 000 3992167 000 48100 2186476 6226743
Central 1650295 000 328067 000 1978362 184000 162000 66630 2390992
Grand Total 7280862 154000 1080649 000 8515511 184000 754750 2307894 11762155
Goa
Daman amp Diu
Gujarat
Madhya Pradesh
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
WESTERN REGION
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
ThermalNuclear Hydro
RES
(MNRE)
State Ownership Sector
Mode wise breakup
Grand Total
Chhattisgarh
Maharashtra
Dadra amp Nagar
Naveli
Central - Unallocated
Total (Western
Region)
(As on 30042019)
Coal Lignite Gas Diesel Total
State 501000 000 23540 000 524540 000 167360 5618 697518
Private 387388 000 381318 3680 772386 000 000 743342 1515728
Central 154683 12773 000 000 167456 12727 000 25000 205183
Sub-Total 1043071 12773 404858 3680 1464382 12727 167360 773960 2418429
State 558250 000 000 000 558250 000 247993 4122 810365
Private 83945 000 83182 000 167127 000 000 393644 560771
Central 180685 14927 000 000 195612 14873 000 1000 211485
Sub-Total 822880 14927 83182 000 920989 14873 247993 398766 1582621
State 502000 000 000 12792 514792 000 358660 19389 892841
Private 195850 000 000 2520 198370 000 000 1363591 1561961
Central 242780 40140 000 000 282920 69800 000 000 352720
Sub-Total 940630 40140 000 15312 996082 69800 358660 1382979 2807521
State 000 000 000 15996 15996 000 185650 17290 218936
Private 61500 000 17400 000 78900 000 000 19021 97921
Central 86142 28180 35958 000 150280 36200 000 5000 191480
Sub-Total 147642 28180 53358 15996 245176 36200 185650 41311 508337
State 432000 000 52408 000 484408 000 217820 12270 714498
Private 458767 25000 50310 21170 555247 000 000 1229228 1784475
Central 302532 136420 000 000 438952 144800 000 23190 606942
Sub-Total 1193299 161420 102718 21170 1478607 144800 217820 1264688 3105915
State 000 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 000 000 000
Central 000 10000 000 000 10000 000 000 000 10000
Sub-Total 000 10000 000 000 10000 000 000 000 10000
State 000 000 3250 000 3250 000 000 000 3250
Private 000 000 000 000 000 000 000 314 314
Central 14080 10760 000 000 24840 8600 000 000 33440
Sub-Total 14080 10760 3250 000 28090 8600 000 314 37004
142600 35800 000 000 178400 45000 000 000 223400
State 1993250 000 79198 28788 2101236 000 1177483 58688 3337407
Private 1187450 25000 532210 27370 1772030 000 000 3749140 5521170
Central 1123502 289000 35958 000 1448460 332000 000 54190 1834650
Grand Total 4304202 314000 647366 56158 5321726 332000 1177483 3862018 10693227
Kerala
Andhra Pradesh
Telangana
Karnataka
Total (Southern
Region)
Tamil Nadu
NLC
Puducherry
Central - Unallocated
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
SOUTHERN REGION
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
State Ownership Sector
Mode wise breakup
Grand TotalThermalNuclear Hydro
RES
(MNRE)
(As on 30042019)
Coal Lignite Gas Diesel Total
State 000 000 000 000 000 000 000 7070 7070
Private 28100 000 000 000 28100 000 000 25545 53645
Central 384933 000 000 000 384933 000 11000 000 395932
Sub-Total 413033 000 000 000 413033 000 11000 32615 456647
State 42000 000 000 000 42000 000 13000 405 55405
Private 73000 000 000 000 73000 000 000 3495 76495
Central 39374 000 000 000 39374 000 6100 000 45474
Sub-Total 154374 000 000 000 154374 000 19100 3900 177374
State 540000 000 10000 000 550000 000 98600 12195 660795
Private 243700 000 000 000 243700 000 000 35250 278950
Central 76077 000 000 000 76077 000 41000 000 117077
Sub-Total 859777 000 10000 000 869777 000 139600 47445 1056822
State 000 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 000 000 000
Central 698504 000 000 000 698504 000 18620 000 717124
Sub-Total 698504 000 000 000 698504 000 18620 000 717124
State 42000 000 000 000 42000 000 206192 2630 250822
Private 293900 000 000 000 293900 000 000 47346 341246
Central 163390 000 000 000 163390 000 8900 1000 173290
Sub-Total 499290 000 000 000 499290 000 215092 50976 765358
State 000 000 000 000 000 000 36000 5211 41211
Private 000 000 000 000 000 000 39900 001 39901
Central 8703 000 000 000 8703 000 6400 000 15103
Sub-Total 8703 000 000 000 8703 000 82300 5212 96215
112683 000 000 000 112683 000 8501 000 121184
State 624000 000 10000 000 634000 000 353792 27511 1015303
Private 638700 000 000 000 638700 000 39900 111637 790237
Central 1483664 000 000 000 1483664 000 100520 1000 1585184
Grand Total 2746364 000 10000 000 2756364 000 494212 140148 3390724
Total (Eastern
Region)
Bihar
Jharkhand
West Bengal
DVC
Odisha
Sikkim
Central - Unallocated
HydroOwnership Sector
Mode wise breakup
Grand TotalThermalNuclear
RES
(MNRE)
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
State
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
EASTERN REGION
(As on 30042019)
Coal Lignite Gas Diesel Total
State 000 000 32821 000 32821 000 10000 501 43322
Private 000 000 2450 000 2450 000 000 2650 5100
Central 40852 000 43556 000 84408 000 35708 2500 122616
Sub-Total 40852 000 78827 000 119679 000 45708 5651 171038
State 000 000 000 000 000 000 000 10711 10711
Private 000 000 000 000 000 000 000 2939 2939
Central 3705 000 4682 000 8387 000 11655 000 20042
Sub-Total 3705 000 4682 000 8387 000 11655 13650 33692
State 000 000 000 000 000 000 32200 3253 35453
Private 000 000 000 000 000 000 000 012 012
Central 4560 000 10969 000 15529 000 7227 000 22756
Sub-Total 4560 000 10969 000 15529 000 39427 3265 58221
State 000 000 16950 000 16950 000 000 1601 18551
Private 000 000 000 000 000 000 000 009 009
Central 5610 000 43695 000 49305 000 6849 500 56654
Sub-Total 5610 000 60645 000 66255 000 6849 2110 75214
State 000 000 000 3600 3600 000 000 545 4145
Private 000 000 000 000 000 000 000 344 344
Central 4710 000 7157 000 11867 000 9534 000 21401
Sub-Total 4710 000 7157 3600 15467 000 9534 889 25890
State 000 000 000 000 000 000 000 3067 3067
Private 000 000 000 000 000 000 000 100 100
Central 3210 000 4893 000 8103 000 5733 000 13836
Sub-Total 3210 000 4893 000 8103 000 5733 3167 17003
State 000 000 000 000 000 000 000 3647 3647
Private 000 000 000 000 000 000 000 050 050
Central 3105 000 4046 000 7151 000 9794 000 16945
Sub-Total 3105 000 4046 000 7151 000 9794 3697 20642
11250 000 6362 000 17612 000 14000 000 31612
State 000 000 49771 3600 53371 000 42200 23325 118895
Private 000 000 2450 000 2450 000 000 6104 8554
Central 77002 000 125360 000 202362 000 100500 3000 305862
Grand Total 77002 000 177581 3600 258183 000 142700 32429 433311
Assam
Arunachal Pradesh
Meghalaya
Tripura
Manipur
Nagaland
Mizoram
Central - Unallocated
Total (North-
Eastern Region)
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
NORTH-EASTERN REGION
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
State Ownership Sector
Mode wise breakup
Grand TotalThermalNuclear Hydro
RES
(MNRE)
(As on 30042019)
Coal Lignite Gas Diesel Total
State 000 000 000 4005 4005 000 000 525 4530
Private 000 000 000 000 000 000 000 663 663
Central 000 000 000 000 000 000 000 510 510
Sub-Total 000 000 000 4005 4005 000 000 1698 5703
State 000 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 000 075 075
Central 000 000 000 000 000 000 000 000 000
Sub-Total 000 000 000 000 000 000 000 075 075
State 000 000 000 4005 4005 000 000 525 4530
Private 000 000 000 000 000 000 000 738 738
Central 000 000 000 000 000 000 000 510 510
Grand Total 000 000 000 4005 4005 000 000 1773 5778
Andaman amp
Nicobar
Lakshadweep
Total (Islands)
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
ISLANDS
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
State Ownership Sector
Mode wise breakup
Grand TotalThermalNuclear Hydro
RES
(MNRE)
SrNo Contents Page
1 Executive summary of Target and Achievement of Transmission Lines during 2019-20
20(1)
2 List of Transmission Lines CommissionedReady for commissioning during Apr-2019 20(2)
Section C - Transmission Lines
1 Executive summary of Target and Achievement of Transmission Lines during 2019-20 As on 30-04-19
(All figures in circuit kms)
Ce
ntr
al S
ecto
r
Sta
te S
ecto
r
JV
Pri
va
te S
ecto
r
To
tal
Ce
ntr
al S
ecto
r
Sta
te S
ecto
r
JV
Pri
va
te S
ecto
r
To
tal
Ce
ntr
al S
ecto
r
Sta
te S
ecto
r
JV
Pri
va
te S
ecto
r
To
tal
Ce
ntr
al S
ecto
r
Sta
te S
ecto
r
JV
Pri
va
te S
ecto
r
To
tal
Ce
ntr
al S
ecto
r
Sta
te S
ecto
r
JV
Pri
va
te S
ecto
r
To
tal
Ce
ntr
al
Se
cto
r
Sta
te S
ec
tor
JV
Pri
va
te S
ec
tor
Gra
nd
To
tal
0 0 0 0 0 0 0 0 2727 958 2334 6019 2239 3416 1143 6798 781 10023 0 10804 5747 14397 3477 23621
Apr19 Programme 0 0 0 0 0 0 0 0 577 416 557 1550 60 890 203 1153 0 309 0 309 637 1615 760 3012
Achievement 0 0 0 0 0 0 0 0 53 0 0 53 0 20 0 20 0 401 0 401 53 421 0 474
Upto Apr-19 Programme 0 0 0 0 0 0 0 0 577 416 557 1550 60 890 203 1153 0 309 0 309 637 1615 760 3012
Achievement 0 0 0 0 0 0 0 0 53 0 0 53 0 20 0 20 0 401 0 401 53 421 0 474
20(1)
220 kV Grand Total 800 kV 500 kV
Programme 2019-20
Programme
Achievement
HVDC765 kV 400 kV
Line
1 2 3 4 5 6
1 400 Bhadla (PG) - Bhadla (RVPN) line DC PGCIL 53
53
2 400 LILO of one ckt Jhanor - Navsari at Vav Ss DC GETCO 20
3 220 Banda-Chitrakoot Line DC UPPTCL 226
4 220 Gorakhpur (PG)-Gola line DC UPPTCL 82
5 220 Hapur(765) - Faridnagar line SC UPPTCL 11
6 220 Kalikiri - Madanapalli line DC APTRANSCO 60
7 220LILO of Gr Noida -Noida Sec-129 at Noida
Sec-148DC UPPTCL 1
8 220LILO of one Ckt of Badshahpur Pali at Sec-
65 GurgaonDC HVPNL 3
9 220 Sultanpur-Sangipur LILO Section at Amethi DC UPPTCL 18
421
0
474
20(2)
Grand Total
2Transmission Lines (220 kV and above) CommissionedReady for commissioning During Apr-2019
Voltage
Level (kV)Name of Transmission Lines
Circuit
Type
Executing
Agency
CENTRAL SECTOR
Total of CENTRAL SECTOR
STATE SECTOR Sector
Total of STATE SECTOR
PRIVATE SECTOR
Total of PRIVATE SECTOR
SlNo
Length(CKm)
As on 30-04-19
SN Contents Page
1 Executive summary of Target and Achievement of Substations during 2019-20 21(1)
2Sub Stations (220 kV and above) commissionedready for commisssioning during Apr-
201921(2)
Section D - Sub Stations
1 Executive summary of Target and Achievement of Substations during 2019-2020 As on 30-04-19
(All figures in circuit MVA)
Ce
ntr
al S
ecto
r
Sta
te S
ecto
r
JV
Pri
va
te S
ecto
r
To
tal
Ce
ntr
al S
ecto
r
Sta
te S
ecto
r
JV
Pri
va
te S
ecto
r
To
tal
Ce
ntr
al S
ecto
r
Sta
te S
ecto
r
JV
Pri
va
te S
ecto
r
To
tal
Ce
ntr
al S
ecto
r
Sta
te S
ecto
r
JV
Pri
va
te S
ecto
r
To
tal
Ce
ntr
al S
ecto
r
Sta
te S
ecto
r
JV
Pri
va
te S
ecto
r
To
tal
Ce
ntr
al S
ec
tor
Sta
te S
ec
tor
JV
Pri
va
te S
ec
tor
Gra
nd
To
tal
3000 0 0 3000 0 0 0 0 18000 3000 6000 27000 5205 19665 4260 29130 800 21786 0 22586 27005 44451 10260 81716
Apr19 Programme 0 0 0 0 0 0 0 0 3000 0 3000 6000 0 1000 2000 3000 0 800 0 800 3000 1800 5000 9800
Achievement 0 0 0 0 0 0 0 0 500 0 0 500 815 1980 0 2795 0 1305 0 1305 1315 3285 0 4600
Upto Apr-19 Programme 0 0 0 0 0 0 0 0 3000 0 3000 6000 0 1000 2000 3000 0 800 0 800 3000 1800 5000 9800
Achievement 0 0 0 0 0 0 0 0 500 0 0 500 815 1980 0 2795 0 1305 0 1305 1315 3285 0 4600
21(1)
220 kV Grand Total 800 kV 500 kV
Programme 2019-20
Programme
Achievement
HVDC765 kV 400 kV
As on 30-04-19
Sl Voltage Ratio Capacity
No (kVkV) (MWMVA)
1 2 3 4 5
1 Bhadla SS (3x1500 3x500 MVA) 765400 PGCIL 500
2 Extn at Tumkur (Pavagada ) PS (2x500 MVA) 400220 PGCIL 500
3 Bongaigaon (2nd ICT) Ss 400220 PGCIL 315
Total of CENTRAL SECTOR 1315
4 Motiram Adda Gorakhpur (Aug) (Additional TF) 400220 UPPTCL 240
5 Muradnagar-II Ghaziabad (Aug) (Additional TF) 400220 UPPTCL 240
6 Noida Sec- 148 GBNagar (New) 400220 UPPTCL 5007 Sarnath Varanasi (Aug) TF- II (500-315) 400220 UPPTCL 1858 Sarojininagar Lucknow Aug) TF- II (500-315) 400220 UPPTCL 185
9 Unnao (Aug) TF-III 400220 UPPTCL 31510 Nawada SS 400220 HVPNL 31511 Kharepatan SS 22033 MSETCL 2512 Prathipadu SS 220132 APTRANSCO 10013 Pali Ss 22066 HVPNL 160
14 A-5 Faridabad Ss 22066 HVPNL 60
15 Rentachintala Ss Aug(3X100-2x100) 220132 APTRANSCO 10016 Amethi Ss 220132 UPPTCL 160
17 Gajokhar Varanasi (Aug) TF- II (160-100) 220132 UPPTCL 60
18 Gola Gorakhpur (New) 220132 UPPTCL 160
19 Khurja Bulandshahr (Aug) TF- II (200-160) 220132 UPPTCL 40
20 RC Green GB Nagar (Aug) TF-II (160-100) 220132 UPPTCL 60
21 Sikandrabad Bulandshahr (Aug) (Additional TF) 220132 UPPTCL 160
22 Sitapur (Aug) (Additional TF) 220132 UPPTCL 160
23 Sohawal Ayodhya (Aug) TF-II (160-100) 220132 UPPTCL 60
TOTAL STATE SECTOR 3285
GRAND TOTAL 4600
21(2)
CENTRAL SECTOR
STATE SECTOR
2Sub-Stations (220 kV and above) CommissionedReady for commissioning During Apr-2019
Name of Sub Stations Executing Agency
SN Contents Page
1 Electricity Generation (MU) Targets and Achievements for 2019-20 22
Section E - Electricity Generation
Programme Achievement Ach Programme Achievement Ach
Central Sector 37545100 3177900 3129530 9848 3177900 3129530 9848
State Sector 37498600 3322500 2950558 8881 3322500 2950558 8881
PvtIPP Sector 37346200 3236400 3195940 9875 3236400 3195940 9875
PvtUTL Sector 1823100 159300 165579 10394 159300 165579 10394
Total 114213000 9896100 9441607 9541 9896100 9441607 9541
Central Sector 5661700 386100 481390 12468 386100 481390 12468
State Sector 6680500 498200 536514 10769 498200 536514 10769
PvtIPP Sector 1206900 57300 80405 14032 57300 80405 14032
PvtUTL Sector 144100 12300 10930 8886 12300 10930 8886
Total 13693200 953900 1109239 11628 953900 1109239 11628
Central Sector 4472000 367300 317765 8651 367300 317765 8651
Total 4472000 367300 317765 8651 367300 317765 8651
Bhutan Import 621800 17500 24396 13941 17500 24396 13941
Central Sector 47678800 3931300 3928685 9993 3931300 3928685 9993
State Sector 44179100 3820700 3487072 9127 3820700 3487072 9127
Pvt Sector 40520300 3465300 3452854 9964 3465300 3452854 9964
Total 133000000 11234800 10893007 9696 11234800 10893007 9696
Provisional based on actual-cum-Assesment
Figs in MU
Cummulative
Achievement
Cummulative
Achievement
Mar-19 Mar-18 Upto Mar-2019 Upto Mar-2018
984785 869291 12675910 10183949
22
1 Electricity Generation (MU) Targets and Achievememts for 2019-20
All India Energy Generation During Apr-19 to Apr-19 (MU)
Target (2019-20)Apr-19 to Apr-19
Sector
Hydro
Thermal
Nuclear
Renewable Energy Generation
Achievement
Apr-2019
98961
95393673
112348
94416
11092
3178
108930
0
20000
40000
60000
80000
100000
120000
Thermal Hydro Nuclear Total
Programme
Achievement
SN Contents Page
1 Energy Power Supply Position (Provisional) for Apr-2019 and during Apr-19 to Apr-19 23
2 Peak Power Supply Position (Provisional) for Apr-2019 and during Apr-19 to Apr-19 24
3 Energy Power Supply Position (Revised) for Mar-2019 and during Apr-19 to Mar-19 25
4 Peak Power Supply Position (Revised) for Mar-2019 and during Apr-19 to Mar-19 26
5 Notified Power cuts Restrictions on Industries during Apr-2019 27
6 Power Supply to Agricultural Sector during Apr-2019 28
Section F - Power supply position
आकड़ मममलयन यननट नट Figures in MU net
ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied
कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )
चडीगढ़ Chandigarh 117 117 0 00 117 117 0 00
दिलली Delhi 2698 2698 1 00 2698 2698 1 00
हरियजणज Haryana 3773 3773 0 00 3773 3773 0 00
दहमजचल परिश Himachal Pradesh 777 777 0 00 777 777 0 00
रमम कशमीि Jammu amp Kashmir 1604 1296 308 192 1604 1296 308 192
परजब Punjab 3646 3646 0 00 3646 3646 0 00
िजरसथजन Rajasthan 6210 6208 2 00 6210 6208 2 00
उतति परिश Uttar Pradesh 10179 10148 32 03 10179 10148 32 03
उततिजखड Uttarakhand 1120 1120 0 00 1120 1120 0 00
उततरी कषतर Northern Region 30094 29786 308 10 30094 29786 308 10
छततीसगढ़ Chhattisgarh 2684 2676 8 03 2684 2676 8 03
गरिजत Gujarat 10718 10718 0 00 10718 10718 0 00
मधय परिश Madhya Pradesh 6006 6006 0 00 6006 6006 0 00
महजिजषटर Maharashtra 14308 14308 0 00 14308 14308 0 00
िमन औि दिउ Daman amp Diu 220 220 0 00 220 220 0 00
िजिि व नगि हवली Dadra amp Nagar Haveli 552 552 0 00 552 552 0 00
गोवज Goa 388 388 0 00 388 388 0 00
पशचिमी कषतर Western Region 34875 34868 8 00 34875 34868 8 00
आनधर परिश Andhra Pradesh 5708 5708 0 00 5708 5708 0 00
तलगजनज Telangana 5725 5725 0 00 5725 5725 0 00
कनजाटक Karnataka 7003 7003 0 00 7003 7003 0 00
किल Kerala 2402 2400 2 01 2402 2400 2 01
तममल नजड Tamil Nadu 10010 10010 0 00 10010 10010 0 00
पडचिी Puducherry 263 263 0 00 263 263 0 00
लकष-दवीप Lakshadweep 4 4 0 0 4 4 0 0
दकषकषणी कषतर Southern Region 31111 31109 2 00 31111 31109 2 00
बबहजि Bihar 2589 2589 0 00 2589 2589 0 00
िजमोिि घजटी ननगम DVC 1772 1772 0 00 1772 1772 0 00
झजिखणड Jharkhand 689 689 0 00 689 689 0 00
ओडडशज Odisha 2689 2689 1 00 2689 2689 1 00
पशशचम बगजल West Bengal 5075 5075 0 00 5075 5075 0 00
मसशककम Sikkim 37 37 0 00 37 37 0 00
अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 7 29 27 2 7
परवी कषतर Eastern Region 12851 12850 1 00 12851 12850 1 00
अरणजचल परिश Arunachal Pradesh 66 66 0 05 66 66 0 05
असम Assam 766 709 57 75 766 709 57 75
मणणपि Manipur 68 67 1 15 68 67 1 15
मघजलय Meghalaya 170 160 10 59 170 160 10 59
ममज़ोिम Mizoram 54 53 0 08 54 53 0 08
नजगजलड Nagaland 54 54 0 08 54 54 0 08
बिपिज Tripura 122 120 1 12 122 120 1 12
उततर-परवी कषतर North-Eastern Region 1300 1228 71 55 1300 1228 71 55
समपणण भारत All India 110231 109842 389 04 110231 109842 389 04
23
ऊरजा पनत ा म कमी ऊरजा पनत ा म कमीEnergy not Supplied
Excludes energy exported to Bangladesh
Energy not Supplied
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
ऊराण वरवदयत आपरत ण शथिरत ररपोरण (परवाणरवलोकन) Energy Power Supply Position Report (Provisional)
राजयState
अपरल 2019 April2019 अपरल2019 -अपरल2019 April2019 to April2019
अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met
कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )
चडीगढ़ Chandigarh 256 256 0 00 256 256 0 00
दिलली Delhi 5664 5664 0 00 5664 5664 0 00
हरियजणज Haryana 8127 8127 0 00 8127 8127 0 00
दहमजचल परिश Himachal Pradesh 1387 1387 0 00 1387 1387 0 00
रमम कशमीि Jammu amp Kashmir 2826 2261 565 200 2826 2261 565 200
परजब Punjab 7015 7015 0 00 7015 7015 0 00
िजरसथजन Rajasthan 10560 10560 0 00 10560 10560 0 00
उतति परिश Uttar Pradesh 19935 19935 0 00 19935 19935 0 00
उततिजखड Uttarakhand 1922 1922 0 00 1922 1922 0 00
उततरी कषतर Northern Region 54476 53985 491 09 54476 53985 491 09
छततीसगढ़ Chhattisgarh 4596 4574 22 05 4596 4574 22 05
गरिजत Gujarat 17871 17865 6 00 17871 17865 6 00
मधय परिश Madhya Pradesh 10018 10018 0 00 10018 10018 0 00
महजिजषटर Maharashtra 23158 23150 8 00 23158 23150 8 00
िमन औि दिउ Daman amp Diu 341 340 1 02 341 340 1 02
िजिि व नगि हवली Dadra amp Nagar Haveli 818 818 0 00 818 818 0 00
गोवज Goa 594 594 0 00 594 594 0 00
पशचिमी कषतर Western Region 56242 56222 20 00 56242 56222 20 00
आनधर परिश Andhra Pradesh 9151 9151 0 00 9151 9151 0 00
तलगजनज Telangana 10191 10191 0 00 10191 10191 0 00
कनजाटक Karnataka 12681 12681 0 00 12681 12681 0 00
किल Kerala 4309 4300 8 02 4309 4300 8 02
तममल नजड Tamil Nadu 15972 15972 0 00 15972 15972 0 00
पडचिी Puducherry 482 480 2 05 482 480 2 05
लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0
दकषकषणी कषतर Southern Region 49155 49103 52 01 49155 49103 52 01
बबहजि Bihar 5357 5357 0 00 5357 5357 0 00
िजमोिि घजटी ननगम DVC 3039 3039 0 00 3039 3039 0 00
झजिखणड Jharkhand 1266 1266 0 00 1266 1266 0 00
ओडडशज Odisha 5389 5389 0 00 5389 5389 0 00
पशशचम बगजल West Bengal 8666 8666 0 00 8666 8666 0 00
मसशककम Sikkim 100 100 0 00 100 100 0 00
अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7
परवी कषतर Eastern Region 23349 23349 0 00 23349 23349 0 00
अरणजचल परिश Arunachal Pradesh 139 136 3 22 139 136 3 22
असम Assam 1712 1667 45 26 1712 1667 45 26
मणणपि Manipur 197 188 9 46 197 188 9 46
मघजलय Meghalaya 336 336 0 00 336 336 0 00
ममज़ोिम Mizoram 116 113 3 26 116 113 3 26
नजगजलड Nagaland 157 131 26 166 157 131 26 166
बिपिज Tripura 292 291 1 03 292 291 1 03
उततर-परवी कषतर North-Eastern Region 2848 2780 68 24 2848 2780 68 24
समपणण भारत All India 177411 176810 601 03 177411 176810 601 03
24
मजग की पनत ा म कमी Demand not Met
Excludes the supply to Bangladesh
राजयStateअपरल 2019 April2019
मजग की पनत ा म कमी Demand not Met
अधिकतम वरवदयत आपरत ण शथिरत ररपोरण (परवाणरवलोकन) Peak Power Supply Position Report (Provisional)
आकड़ मगज वजट नट Figures in MW netअपरल2019 -अपरल2019 April2019 to April2019
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
आकड़ मममलयन यननट नट Figures in MU net
ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied
कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )
चडीगढ़ Chandigarh 96 96 0 00 1561 1561 0 00
दिलली Delhi 1931 1930 1 00 32299 32282 17 01
हरियजणज Haryana 3658 3658 0 00 53665 53665 0 00
दहमजचल परिश Himachal Pradesh 832 830 2 02 9850 9618 232 24
रमम कशमीि Jammu amp Kashmir 1767 1414 353 200 19593 15868 3725 190
परजब Punjab 3585 3585 0 00 55288 55275 13 00
िजरसथजन Rajasthan 6774 6770 4 01 79826 79637 189 02
उतति परिश Uttar Pradesh 8754 8691 63 07 117101 116118 984 08
उततिजखड Uttarakhand 1067 1067 0 00 13845 13753 92 07
उततरी कषतर Northern Region 28464 28041 423 15 383028 377776 5251 14
छततीसगढ़ Chhattisgarh 2464 2457 8 03 26130 26076 54 02
गरिजत Gujarat 9890 9890 0 00 116588 116572 15 00
मधय परिश Madhya Pradesh 6236 6236 0 00 75667 75665 2 00
महजिजषटर Maharashtra 13631 13631 0 00 158285 158148 137 01
िमन औि दिउ Daman amp Diu 221 221 0 00 2557 2557 0 00
िजिि व नगि हवली Dadra amp Nagar Haveli 553 553 0 00 6317 6317 0 00
गोवज Goa 362 362 0 00 4283 4280 3 01
पशचिमी कषतर Western Region 33357 33349 8 00 389827 389615 212 01
आनधर परिश Andhra Pradesh 6072 6071 1 00 63735 63677 58 01
तलगजनज Telangana 6930 6929 1 00 66697 66635 62 01
कनजाटक Karnataka 7614 7612 1 00 71759 71690 69 01
किल Kerala 2489 2488 1 00 25029 24911 118 05
तममल नजड Tamil Nadu 10247 10245 2 00 109375 109273 102 01
पडचिी Puducherry 252 251 1 04 2761 2751 10 03
लकष-दवीप Lakshadweep 4 4 0 0 46 46 0 0
दकषकषणी कषतर Southern Region 33605 33597 8 00 339355 338938 417 01
बबहजि Bihar 2319 2318 1 00 30052 29827 225 07
िजमोिि घजटी ननगम DVC 1773 1772 1 00 22365 21995 369 17
झजिखणड Jharkhand 698 697 1 01 8682 8461 221 25
ओडडशज Odisha 2583 2582 1 00 31810 31781 30 01
पशशचम बगजल West Bengal 4585 4584 2 00 52237 52078 159 03
मसशककम Sikkim 41 41 0 00 513 512 0 01
अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 67 346 323 23 67
परवी कषतर Eastern Region 11999 11995 5 00 145658 144654 1004 07
अरणजचल परिश Arunachal Pradesh 61 60 0 06 864 855 9 10
असम Assam 680 656 23 34 9532 9204 328 34
मणणपि Manipur 68 68 1 09 916 906 10 11
मघजलय Meghalaya 173 173 0 03 1955 1953 1 01
ममज़ोिम Mizoram 50 49 0 09 668 661 8 12
नजगजलड Nagaland 58 57 1 20 902 809 93 103
बिपिज Tripura 150 150 0 00 1859 1837 21 11
उततर-परवी कषतर North-Eastern Region 1240 1214 26 21 16696 16225 471 28
समपणण भारत All India 108665 108196 469 04 1274564 1267209 7355 06
Note The revised data for March 2019 is not avaliable
Excludes energy exported to Bangladesh
राजयState
ऊराण वरवदयत आपरत ण शथिरत ररपोरण (परवाणरवलोकन) Energy Power Supply Position Report (Provisional)
25
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
Energy not Supplied Energy not Supplied
मािण2019 March2019 अपरल2018 -मािण2019 April2018 to March2019
ऊरजा पनत ा म कमी ऊरजा पनत ा म कमी
अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met
कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )
चडीगढ़ Chandigarh 223 223 0 00 369 369 0 00
दिलली Delhi 4016 4016 0 00 7016 7016 0 00
हरियजणज Haryana 6544 6544 0 00 10270 10270 0 00
दहमजचल परिश Himachal Pradesh 1683 1683 0 00 1700 1700 0 00
रमम कशमीि Jammu amp Kashmir 3277 2622 655 200 3277 2622 655 200
परजब Punjab 6564 6564 0 00 12638 12638 0 00
िजरसथजन Rajasthan 11885 11885 0 00 13276 13276 0 00
उतति परिश Uttar Pradesh 16220 16220 0 00 20498 20062 436 21
उततिजखड Uttarakhand 2002 2002 0 00 2216 2216 0 00
उततरी कषतर Northern Region 47925 47356 569 12 63166 61726 1440 23
छततीसगढ़ Chhattisgarh 4444 4128 316 71 4444 4270 174 39
गरिजत Gujarat 16263 16263 0 00 17053 16963 90 05
मधय परिश Madhya Pradesh 12328 12323 5 00 13815 13815 0 00
महजिजषटर Maharashtra 22361 22291 70 03 23864 23254 610 26
िमन औि दिउ Daman amp Diu 336 336 0 01 357 356 1 02
िजिि व नगि हवली Dadra amp Nagar Haveli 800 799 1 01 816 815 1 01
गोवज Goa 538 538 0 00 596 596 0 00
पशचिमी कषतर Western Region 53132 52965 167 03 56675 55821 853 15
आनधर परिश Andhra Pradesh 8977 8977 0 00 9459 9453 6 01
तलगजनज Telangana 10471 10471 0 00 10815 10815 0 00
कनजाटक Karnataka 12841 12841 0 00 12841 12841 0 00
किल Kerala 4264 4228 36 09 4264 4228 36 09
तममल नजड Tamil Nadu 15712 15712 0 00 15712 15712 0 00
पडचिी Puducherry 427 412 15 34 427 412 15 34
लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0
दकषकषणी कषतर Southern Region 49464 49464 0 00 49464 49464 0 00
बबहजि Bihar 4633 4633 0 00 5115 5084 31 06
िजमोिि घजटी ननगम DVC 3035 3035 0 00 3035 3035 0 00
झजिखणड Jharkhand 1210 1210 0 00 1339 1291 48 36
ओडडशज Odisha 4827 4827 0 00 5357 5357 0 00
पशशचम बगजल West Bengal 8287 8287 0 00 9130 9123 7 01
मसशककम Sikkim 100 100 0 00 106 106 0 00
अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7
परवी कषतर Eastern Region 21658 21658 0 00 23141 22733 408 18
अरणजचल परिश Arunachal Pradesh 133 131 2 15 138 138 0 01
असम Assam 1539 1508 31 20 1865 1809 56 30
मणणपि Manipur 204 199 5 25 219 216 3 12
मघजलय Meghalaya 357 357 0 00 374 372 1 04
ममज़ोिम Mizoram 108 105 3 28 121 119 2 17
नजगजलड Nagaland 127 125 2 16 156 138 18 116
बिपिज Tripura 249 249 0 00 298 293 5 17
उततर-परवी कषतर North-Eastern Region 2540 2535 5 02 2967 2850 117 39
समपणण भारत All India 169464 168745 719 04 177022 175528 1494 08
Note The revised data for March 2019 is not avaliable 26
अधिकतम वरवदयत आपरत ण शथिरत ररपोरण (परवाणरवलोकन) Peak Power Supply Position Report (Provisional)
आकड़ मगज वजट नट Figures in MW net
राजयStateमािण2019 March2019 अपरल2018 -मािण2019 April2018 to March2019
मजग की पनत ा म कमी मजग की पनत ा म कमी Demand not MetDemand not Met
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
Excludes the supply to Bangladesh
अपरल 2019 April2019 अपरल2018 -मािण2019 April2019 to April2019
उततरी कषतर Northern Region
चडीगढ़ Chandigarh(Data Not Received)दिलली Delhi
हरियजणज Haryana
दहमजचल परिश Himachal Pradeshरमम कशमीि Jammu amp Kashmir(Data
Not Received)परजब Punjab
िजरसथजन Rajasthanउतति परिश Uttar Pradesh
उततिजखड Uttarakhand
पशचिमी कषतर Western Region
छततीसगढ़ Chhattisgarh
Apr-Nov 2018- No cuts
Maximum Demand cut-58MW
Energy cut- 00020-00032 MUsday
गरिजत Gujarat
मधय परिश Madhya Pradesh
महजिजषटर Maharashtra
गोवज Goa
दकषकषणी कषतर Southern Region
आनधर परिश Andhra Pradesh
तलगजनज Telangana
कनजाटक Karnataka
किल Kerala
तममल नजड Tamil Nadu
पडचिी Puducherryपरवी कषतर Eastern Region
बबहजि Bihar
झजिखणड Jharkhand
ओडडशज Odisha
पशशचम बगजल West Bengal
No N
otifie
d Cu
ts
27
मािण 2019 म इडथरीर पर वरवदयत करौती का वरवरवरण Notified Power CutsRestrictions on Industries during April2019
राजय कषतर State Regionऊराणमाग करौती EnergyDemand Cut
No N
otifie
d Cu
tsNo
Notifie
d Cu
ts
अपरल2019 April 2019 अपरल2019 -अपरल2019 April2019 to April2019
उततरी कषतर Northern Region
चडीगढ़ Chandigarh Data not received Data not received
दिलली Delhi Data not received Data not received
हरियजणज Haryana 0811 hrsday 0811 hrsday
दहमजचल परिश Himachal Pradesh HPSEBL has only 2 agriculture consumers and uninterrupted
power is being supplied to agriculture sector
HPSEBL has only 2 agriculture consumers and uninterrupted
power is being supplied to agriculture sector
रमम कशमीि Jammu amp Kashmir Data not received Data not received
परजब Punjab 379 hrsday 379 hrsday
िजरसथजन Rajasthan 0630 hrsday 0630 hrsday
उतति परिश Uttar Pradesh 2157 hrsday 2157 hrsday
उततिजखड Uttarakhand 2359 hrsday 2359 hrsday
पशचिमी कषतर Western Region
छततीसगढ़ Chhattisgarh 18 hrsday 18 hrsday
गरिजत Gujarat 8 hrsday 8 hrsday
मधय परिश Madhya Pradesh Three-Phase Supply(Irrigation)- 0953 hrs day Three-Phase
(Mixed) Supply - 2334 hrs day
Three-Phase Supply(Irrigation)- 0953 hrs day Three-Phase
(Mixed) Supply - 2334 hrs day
महजिजषटर Maharashtra Three-Phase Supply(Irrigation)- 9 hrs day Three-Phase Supply(Irrigation)- 9 hrs day
गोवज Goa No restriction No restriction
दकषकषणी कषतर Southern Region
आनधर परिश Andhra Pradesh 07 hrsday 07 hrsday
तलगजनज Telangana 24 hrsday 24 hrsday
कनजाटक Karnataka 6 hrsday 6 hrsday
किल Kerala No Restrictions No Restrictions
तममल नजड Tamil Nadu 9 hrsday (6 hrs during day time and 3 hrs during night time) 9 hrsday (6 hrs during day time and 3 hrs during night time)
पडचिी Puducherry No Restrictions No Restrictions
परवी कषतर Eastern Region
बबहजि Bihar 18 hrsday 18 hrsday
झजिखणड Jharkhand 20 hrsday 20 hrsday
ओडडशज Odisha 24 hrsday 24 hrsday
पशशचम बगजल West Bengal 23 hrsday 23 hrsday
28
मारच 2019 कषि कषतर को षिदयत आपरतच का षििरण Power Supply to Agricultural Sector during March2019
राजय कषतर State Regionऔसत वरवदयत आपरत ण घनरो म Average Hours of Supply
On segregated feeders
SNo Contents Page
1 Growth of Installed Capacity since 6th Plan 29
2 Progress of Transmission Sector since 6th Plan 30
3 All India Yearly Coal consumption for Power Generation (Utilities)
4 All India Annual Per Capita Consumption of Electricity since -2006
5 Average cost of power supply amp Average realisation (Paisakwh)
6 Growth of Rural Electrification amp Pump Sets Energisation
7 Status of Hydro Schemes Cleared by the CEA in Apr-2019
Section G - Growth of Power Sector
31
32
(In MW)
Coal Gas Diesel Total
End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472
End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634
End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537
End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596
End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921
End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703
End of 12th Plan 19216288 2532938 83763 21832988 6780 4447842 50018 31960630
Up to Apr-2019 20070450 2493722 63763 22627934 678000 4539922 7764163 35610019
Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-17) = 51529 MW
Electricity Generation (MU) Targets and Achievements for 2016-17
Coal Gas Diesel Nuclear Hydro Res Total
2007045 2493722 637629 678000 453992 77641625 22925174
29
1 Growth of Installed Capacity Since 6th Plan
Plan YearThermal
Nuclear Hydro RES (MNRE) Total
2007045
2493722637629
678000
4539922
77641625
Total Installed Capacity 35610019 MW
Coal Gas Diesel Nuclear Hydro Res
Progress of Transmission Sector in the Country up to April 2019
1 TRANSMISSION LINES (All fig in CKM)
At the end of
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
6th plan 0 0 0 0 0 0 0 0 0 0 0 0 1831 4198 0 6029 1641 44364 0 46005 3472 48562 0 52034
7th plan 0 0 0 0 0 0 0 0 0 0 0 0 13068 6756 0 19824 4560 55071 0 59631 17628 61827 0 79455
8th plan 0 0 0 0 1634 0 0 1634 0 0 0 0 23001 13141 0 36142 6564 73036 0 79600 31199 86177 0 117376
9th plan 0 0 0 0 3234 1504 0 4738 751 409 0 1160 29345 20033 0 49378 8687 88306 0 96993 42017 110252 0 152269
10th plan 0 0 0 0 4368 1504 0 5872 1775 409 0 2184 48708 24730 0 73438 9444 105185 0 114629 64295 131828 0 196123
11th Plan 0 0 0 0 5948 1504 1980 9432 4839 411 0 5250 71023 30191 5605 106819 10140 125010 830 135980 91950 157116 8415 257481
12th Plan 6124 0 0 6124 5948 1504 1980 9432 25465 1177 4598 31240 92482 48240 17065 157787 11014 151276 978 163268 141033 202197 24621 367851
13th Plan (Up
to Mar2019)6124 0 0 6124 5948 1504 1980 9432 33692 1512 6605 41809 101335 58238 21173 180746 11734 162552 1010 175296 158833 223806 30768 413407
13th Plan (Up
to Apr-19)6124 0 0 6124 5948 1504 1980 9432 33745 1512 6605 41862 101335 58258 21173 180766 11734 162953 1010 175697 158886 224227 30768 413881
27150 600 MW of 132 kV Inter-Regional power transmission capacity links which are operated radially from time to time is not added in the total
75050
47900
24000
99050
30
Grand Total
Note - The figure upto the end of 10th plan in for stringing progress including the lines not commissioned Now only commissioned lines are reckoned Accordingly the figure for 10th plan (end) may read
as 187555 after adjusting with (-) 10852 Ckm
Inter-regional Power Transfer Capacity (MW)
plusmn 800 kV HVDC plusmn 500 kV HVDC 765 kV 400 kV 220 kV
IR addition in 12th
Plan (up to March
2017)
Inter-regional
Transmission
Capacity at the end
of Plan Period 2017-
22 (as on April19)
IR at the end of 11th
PlanIR at the end of 12th
Plan
IR Capacity Addition
at the end of Plan
Period 2017-22 (Till
April 19)
2004-05 27800
2005-06 28100
2006-07 30200
2007-08 33000
2008-09 35500
2009-10 36700
2010-11 38700
2011-12 41756
2012-13 45460
2013-14 48940
2014-15 53040
2015-16 54590
2016-17 57430
2017-18 60800
2018-19 62890
Year
2005-06
2006-07
2007-08
2008-09
2009-10
2010-11
2011-12
2012-13
2013-14
2014-15
2015-16
2016-17
2017-18
2018-19
2004-05 254 209 7568
2005-06 260 221 7636
2006-07 276 227 7423
2007-08 293 239 7727
2008-09 340 263 8713
2009-10 355 268 8870
2010-11 398 303 11975
2011-12 455 330 13514
2012-13 501 376 14867
2013-14 518 175
2014-15 520
Source- PFC Reports on the performance of State Power Utilities 31
1181
7335
7786
91441
8188
88363
957
1010
1075
1122
1149
(GrossGen+ Net Import) Mid-year population Provisional
5 Average cost of power supply amp average realization ( paiseKWH )
Yearcost of supply
(paiseunit)
Realization(paiseunit)
Including AgricultureOnly
Agriculture
6719
7171
3 All India yearly Coal Consumption for Power Generation (Utilities)
YEARCoal Consumption
Million Tonnes
4 All India Annual per Capita consumption of Electricity Since 2006
Per Capita Consumption ( kWh)
6314
Sl
NoExecuting Agency
Installed
Capacity (MW)Cost (Rs crore)
Date of
Clearance
32
Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as
Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received
from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made
available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified
villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is
independent of the earlier published reports
No Hydro Electric Project has been issued concurrenceAppraisal letter by CEA during April 2019
7 Status of Hydro Schemes Cleared by the CEA in Apr-2019
Name of Scheme
1999-002000-01
297594
010408 to 310309010409 to 310310
10th Plan
2005-062006-07
322968331020
6 Growth Of Rural Electrification amp Pumpsets Energisation
Plan Year
9th Plan2002-03
134092626
4111
Pump Sets Energised Villages Electricfied (Nos)
2001-02
284064367244
1218
27801997-981998-99
3207
482864
12632
1576036
4451722594
15455554
2314176
397343611750
2093311060316074
65109527813884
46708
18423975
499150
2003-042004-05
5743
9769
Cumu upto End of 10th Plan
010407 to 310308
010410 to 310311557976840909
010411 to 310312
412667
86293726
No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification
since 2004-05
65291374575 296361511th Plan
Cumu upto End of 11th Plan
596556 21212860
557439Cummulative up to end of 12th Plan
SN Contents Page
1 Rate of sale of power for the year 2016-17 33-41
RATE OF SALE OF POWER FOR THE YEAR 2016-17
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) NORTHERN REGION
CENTRAL SECTOR
BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 18000 66900 19800
CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 54000 222400 21600
CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 30000 144400 19600
CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 23100 91700 42600
PARBATI - III HPS NHPC LTD HYDRO-HYDRO 52000 68200 54800
DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 28000 95600 30000
CHUTAK NHPC LTD HYDRO-HYDRO 4400 22000 79800
DULHASTI HPS NHPC LTD HYDRO-HYDRO 39000 228000 56400
SALAL HPS NHPC LTD HYDRO-HYDRO 69000 342300 11000
TANAKPUR HPS NHPC LTD HYDRO-HYDRO 9420 43000 29600
URI HPS -I NHPC LTD HYDRO-HYDRO 48000 280300 16000
URI HPS - II NHPC LTD HYDRO-HYDRO 24000 147300 48600
NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 4500 24600 88200
SEWA - II NHPC LTD HYDRO-HYDRO 12000 47100 43400
ANTA CCPP NTPC LTD THERMAL-GASN 41930 67539 32400
AURAIYA CCPP NTPC LTD THERMAL-GASN 66336 53501 39100
BADARPUR TPS NTPC LTD THERMAL-COAL 70500 159153 44800
DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 84000 296170 42300
DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 98000 526686 46300
DADRI CCPP NTPC LTD THERMAL-GASHSD 82978 227469 33000
FARIDABAD CCPP NTPC LTD THERMAL-GASN 43159 115577 30800
RIHAND STPS I NTPC LTD THERMAL-COAL 100000 596766 24500
RIHAND STPS II NTPC LTD THERMAL-COAL 100000 737069 24600
RIHAND STPS III NTPC LTD THERMAL-COAL 100000 706546 30600
SINGRAULI STPS NTPC LTD THERMAL-COAL 200000 1394068 20400
TANDA TPS NTPC LTD THERMAL-COAL 44000 295438 40800
UNCHAHAR TPS I NTPC LTD THERMAL-COAL 42000 256454 39800
UNCHAHAR TPS II NTPC LTD THERMAL-COAL 42000 273577 38900
UNCHAHAR TPS III NTPC LTD THERMAL-COAL 21000 142780 43000
KOLDAM NTPC LTD HYDRO-HYDRO 80000 363260 43600
NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 303575 25841
RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 108000 668677 35374
NJHPS SJVNL HYDRO-HYDRO 150000 699496 23820
RAMPUR HPS SJVNL HYDRO-HYDRO 41202 195982 32260
TEHRI HPP THDC HYDRO-HYDRO 100000 272543 51800
KOTESHWAR HEP THDC HYDRO-HYDRO 40000 106244 53400
IGSTPS JHAJJAR ARAVALI P CPL THERMAL-COAL 150000 510429 49490
NEYVELI BARSINGSAR NEYVELI LIG CORP LTD THERMAL-LIG 25000 127520 38040
STATE SECTOR
PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 21000 14222 48200
PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 21000 19205 48400
PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 25000 102257 42600
PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 25000 62107 41800
DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 60000 312213 41000
RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 120000 35767442200
WYC HYDEL STATION HPGCL HYDRO-HYDRO 6240 20365 24900
GIRI POWER HOUSE HPSEB HYDRO-HYDRO 6000 13958 7600
ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 1695 5467 11900
BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 12000 18528 6700
GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 2250 7462 22500
BASSI POWER HOUSE HPSEB HYDRO-HYDRO 6600 29649 7500
BINWA POWER HOUSE HPSEB HYDRO-HYDRO 600 2749 19300
ANNEXURE-I
RATE OF SALE OF POWER FOR THE YEAR 2016-2017
Page 33
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) GAJ POWER HOUSE HPSEB HYDRO-HYDRO 1050 2914 26700
BANER POWER HOUSE HPSEB HYDRO-HYDRO 1200 2864 16200
HOLI POWER HOUSE HPSEB HYDRO-HYDRO 300 616 22500
THIROT POWER HOUSE HPSEB HYDRO-HYDRO 450 1126 22500
KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 1200 3064 22500
LARJI POWER HOUSE HPSEB HYDRO-HYDRO 12600 53677 23700
NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 250 750 31000
CHABA POWER HOUSE HPSEB HYDRO-HYDRO 175 465 23300
RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 150 101 13400
SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 200 000 22500
KILLAR HPSEB HYDRO-HYDRO 030 050 22500
BHABA AUGUMENP H HPSEB HYDRO-HYDRO 450 1276 22500
BS CHAMBA HPSEB HYDRO-HYDRO 045 099 19500
GUMMA HPSEB HYDRO-HYDRO 300 423 22500
GAS TURBINE POWER STATION IPGCL THERMAL-GAS 27000 67233 39300
PPS-I PPCL THERMAL-GAS 33000 175905 38300
PPS-III PPCL THERMAL-GAS 137120 196879 36100
LOWER JHELUM JampKPDD HYDRO-HYDRO 10500 60214 5100
UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 2260 10514 6300
UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 10500 44202 8500
GANDHARBAL JampKPDD HYDRO-HYDRO 1500 8925 4700
KARNAH MPH JampKPDD HYDRO-HYDRO 200 1122 31000
CHENANI I JampKPDD HYDRO-HYDRO 2330 10892 6600
CHENANI II JampKPDD HYDRO-HYDRO 200 1188 9300
CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 750 3634 14200
IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 375 2108 18500
IGO MERCHELLONG JampKPDD HYDRO-HYDRO 300 1572 29700
PAHALGAM MHP JampKPDD HYDRO-HYDRO 450 1713 32900
MARPACHOO JampKPDD HYDRO-HYDRO 075 375 29800
HAFTAL JampKPDD HYDRO-HYDRO 100 483 28700
SANJAK JampKPDD HYDRO-HYDRO 126 441 36000
SEWA-III JampKPDD HYDRO-HYDRO 900 3273 20200
BHADERWAH JampKPDD HYDRO-HYDRO 150 935 8900
BAZGO JampKPDD HYDRO-HYDRO 030 108 33300
SUMOOR JampKPDD HYDRO-HYDRO 010 045 35400
HUNDER JampKPDD HYDRO-HYDRO 040 176 26200
STAKNA JampKPDD HYDRO-HYDRO 400 1933 4100
KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 124000 662879 31360
SURATGARH TPS RRVUNL THERMAL-COAL 150000 402328 41730
CHHABRA TPS 1amp 2 RRVUNL THERMAL-COAL 50000 305946 36700
CHHABRA TPS 3 RRVUNL THERMAL-COAL 25000 151536 36700
CHHABRA TPS 4 RRVUNL THERMAL-COAL 25000 155896 36700
RAMGARH GT POWER PROJECT RRVUNL THERMAL-COAL 22050 43177 41800
RAMGARH GAS T P PROJECT 3 RRVUNL THERMAL-GAS 5000 93615 41800
DHOLPUR C C POWER PROJECT RRVUNL THERMAL-R-LNG 33000 9486 46110
MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 14000 20855 34192
MINI MICRO HYDEL (MMH) P S RRVUNL HYDRO-HYDRO 2385 851 37800
KALISINDH TPP 1 RRVUNL THERMAL-COAL 60000 341543 45000
KALISINDH TPP 2 RRVUNL THERMAL-COAL 60000 211588 45000
KHARA HEP UPJVNL HYDRO-HYDRO 7200 26654 7200
MATATILLA HEP UPJVNL HYDRO-HYDRO 3060 12219 6500
OBRA HEP UPJVNL HYDRO-HYDRO 9900 21517 6300
RIHAND UPJVNL HYDRO-HYDRO 30000 57369 5500
ANPARA A TPS UPRVUNL THERMAL-COAL 63000 317536 27000
ANPARA B TPS UPRVUNL THERMAL-COAL 100000 705605 22700
ANPARA D UPRVUNL THERMAL-COAL 100000 300158 39800
HARDUAGANJ TPS UPRVUNL THERMAL-COAL 16500 45817 49200
HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 50000 304389 46600
OBRA A TPS UPRVUNL THERMAL-COAL 28800 13158 34000
OBRA B TPS UPRVUNL THERMAL-COAL 100000 328124 21900
Page 34
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) PANKI TPS UPRVUNL THERMAL-COAL 21000 66488 50300
PARICHHA TPS UPRVUNL THERMAL-COAL 22000 38762 49400
PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 42000 231931 45600
PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 50000 276722 50400
CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 24000 70845 8290
CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 14400 75366 8390
DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 3375 9595 12080
DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 5100 18701 10520
KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4140 17359 12330
KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 12000 33001 9420
KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 3000 11953 8320
TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 9000 33983 12460
MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 30400 124510 16110
RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 19800 17897 10550
MPUR UTTARAKHAND JVNL HYDRO-HYDRO 930 5121 19200
PATHRI UTTARAKHAND JVNL HYDRO-HYDRO 2040 11636 14200
GALOGI UTTARAKHAND JVNL HYDRO-HYDRO 300 648 12500
PRIVATE SECTOR
MGTPP CLP INDIA PVT LTD THERMAL-COAL 132000 268902 41940
SHRINAGAR HEP ALAKNANDA HPCL HYDRO-HYDRO 33000 127414 48800
GAMA INFRAPROP CCPP GAMA INFRAPROP PVT THERMAL-GAS 22500 52686 47000
PPGCL (BARA) JP POWER VENTURES LTD THERMAL-COAL 198000 448200 38500
MALANA HEP MALANA PCL HYDRO-HYDRO 8600 26354 29792
MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 10000 30369 32580
ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 19200 56347 36079
KASHANG HEP H P PCL HYDRO-HYDRO 19500 5034 29200
BASPA-II HEP HBPCL HYDRO-HYDRO 30000 132769 13600
KARCHAM WANGTOO HEP HBPCL HYDRO-HYDRO 100000 434386 36600
RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 108000 582600 43700
RITHALA COMBI CY POWER PLANT TATA POWER DDL THERMAL-GAS 9480 000 11900
RAJPURA TPS NABHA POWER LTD THERMAL-GAS 140000 901484 39000
TALWANDI SABO POWER LTD TALWANDI SABO POWER LTD THERMAL-COAL 198000 636040 49548
ROJA THERMAL POWER STATION ROJA POWER SCL THERMAL-COAL 120000 727200 43400
KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 34400 63400
BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 36000 62600
MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 38200 60800
UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 37900 61500
KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 42300 58800
LALITPUR PGCL BAJAJ ENERGY PVT LTD THERMAL-COAL 198000 359400 47300
PRAYAGRAJ PGCL PRAYAGRAJ PGCL THERMAL-COAL 132000 448200 38595
KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 132000 783182 33438
WESTERN REGION
CENTRAL SECTOR
INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 100000 325333 23892
OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 52000 141663 34001
GANDHAR CCPP NTPC LTD THERMAL-GAS 65739 221924 28700
KAWAS CCPP NTPC LTD THERMAL-GASN 65620 167929 27000
KORBA I amp II NTPC LTD THERMAL-COAL 210000 1499171 20500
KORBA III NTPC LTD THERMAL-COAL 50000 358746 26600
SIPAT STPS I NTPC LTD THERMAL-COAL 198000 1479902 26800
SIPAT STPS II NTPC LTD THERMAL-COAL 100000 766549 26500
VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 126000 693142 25800
VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 100000 608781 23800
VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 100000 673475 27600
VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 100000 655924 32900
VINDHYACHAL STPS V NTPC LTD THERMAL-COAL 50000 328265 31700
MOUDA I NTPC LTD THERMAL-COAL 100000 343130 44500
MOUDA Ii NTPC LTD THERMAL-COAL 66000 40637 39900
RATNAGIRI GAS amp POWER PVT LTD RGPPL THERMAL-GAS 196708 442485 47000
KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 000 24729
TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 32000 201227 10740
Page 35
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 365122 19069
TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 787444 29324
STATE SECTOR
GSEG-HAZIRA15610 MW GUJARAT S ENEGEN LTD THERMAL-GAS 15610 1805 28200
GSEG-HAZIRA35143 MW GUJARAT S ENEGEN LTD THERMAL-GAS 35130 22276 51300
GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 21978 51800
AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 13929 26100
KORBA TPS EAST CSPGCL THERMAL-COAL 44000 198673 33880
DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 365808 27570
KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 316500 30420
HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 532878 19410
CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 515 58300
MTTPS CHAMPA U-I CSPGCL THERMAL-COAL 50000 220376 39000
MTTPS CHAMPA U-II CSPGCL THERMAL-COAL 50000 23709 10000
SHP GANGREL CSPGCL HYDRO-HYDRO 1000 2350 36790
BANGO HEP CSPGCL HYDRO-HYDRO 12000 14662 8900
MHP KORBA WEST CSPGCL HYDRO-HYDRO 170 859 38190
SIKASAR HEP CSPGCL HYDRO-HYDRO 700 418 26870
DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8843 74500
DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 19446 51500
GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 66388 71600
GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127488 41300
KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 96072 43900
KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 29841 56400
SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 184966 58800
UKAI 1-5 GSECL THERMAL-COAL 85000 204891 46900
UKAI TPS 6 GSECL THERMAL-COAL 50000 284448 48200
WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 271999 58300
WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 82808 44100
KADANA HPS GSECL HYDRO-HYDRO 24200 34433 16800
UKAI HPS GSECL HYDRO-HYDRO 30500 40585 6100
TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 123000 11500
BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 8900 10900
BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 7200 27500
JHINNA HPS MPPGCL HYDRO-HYDRO 2000 9700 18500
RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 44300 3400
GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 17300 4600
SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 4100 16900
MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 14600 27000
PENCH HPS MPPGCL HYDRO-HYDRO 16000 23700 8100
RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 3000 16900
AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 134400 35100
SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 283800 38700
SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 344600 34300
SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 111600 61600
SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 211800 58000
SSTPS PH-I MPPGCL THERMAL-COAL 120000 233100 84300
BHUSAWAL TPS MSPGCL THERMAL-COAL 142000 566258 51100
CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1365682 33700
KHAPERKHEDA MSPGCL THERMAL-COAL 134000 706207 39100
KORADI TPS MSPGCL THERMAL-COAL 62000 443206 42000
NASIK TPS MSPGCL THERMAL-COAL 63000 297275 47000
PARLI TPS MSPGCL THERMAL-COAL 113000 175934 71600
PARAS MSPGCL THERMAL-COAL 50000 267931 38700
URAN CCPP MSPGCL THERMAL-GAS 67200 320330 30600
KOYANA MSPGCL HYDRO-HYDRO 195600 328155 13100
SMALL HYDRO POWER PLANTS MSPGCL HYDRO-HYDRO 45400 93062 30500
BHIRA MSPGCL HYDRO-HYDRO 8000 10046 8400
TILLARI MSPGCL HYDRO-HYDRO 8900 10584 3100
SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 233298 20500
SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 87633 20500
PRIVATE SECTOR
Page 36
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 81282 46750
JNSTPP(JAYPEE NIGRIE) JP POWER VENTURES LTD THERMAL-COAL 132000 726695 29310
MB POWER MB POWER THERMAL-COAL 120000 345632 38310
ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 754922 28671
ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 780761 23495
ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 198000 1263784 32090
ADANI POWER MAHARA ADANI POWER LTD THERMAL-COAL 330000 1666191 34124
AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 170065 36827
SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 252035 45129
ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 458551 36000
ESSAR POWER MP LTD ESSAR POWER MP LTD THERMAL-COAL 60000 243040 28600
VEDANTA LTD (P P -I) VEDANTA LTD THERMAL-GAS 3000 15044 24000
VEDANTA LTD (P P -II) VEDANTA LTD THERMAL-GAS 3000 21293 24000
PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 8234600 24000
165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 5850 64390
145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 68717 40349
SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 132655 28776
SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 144686 38567
MUNDRA UMPPCOASTAL GUJARAT POWER
LTD THERMAL-IMP COAL 400000 2530300
23900
LANCO AMARKANTAK TPP PATHADIH
U-ILANCO AMARKAN POWER LTD THERMAL-COAL 30000 195500
29200
LANCO AMARKANTAK TPP PATHADIH
U-IILANCO AMARKAN POWER LTD THERMAL-COAL 30000 206900
27600
BARADARHA TPS D B POWER LTD THERMAL-COAL 120000 677373 29200
JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 405000 28900
JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 453000 40500
DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 339437 40700
TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 293400 44000
TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 137200 37000
TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 174900 44000
BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 92900 14100
BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23700 34300
KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 27600 48300
CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2530300 23900
BHANDARDRA HEP -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 2475 54900
SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 161400 26500
SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 445000 39000
SOTHERN REGION
CENTRAL SECTOR
NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 325699 54820
NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 305532 39880
NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 998805 38510
NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 113016 54070
NEYVELI TAMILNADU POWER LTD JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 625274 42200
VALLUR TPS NTPC TECL THERMAL-COAL 150000 856438 42350
R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 1493 84300
RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1502919 29400
RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 341291 31800
SIMHADRI I NTPC LTD THERMAL-COAL 100000 688382 36800
SIMHADRI II NTPC LTD THERMAL-COAL 100000 663657 43400
KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 593110 31324
MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 291625 21764
KKNPP-1 amp 2 NPCIL NUCLEAR-NUCLEAR 200000 572609 40948
MINICOY LAKSHADEEP THERMAL-DIESEL 340 770 29600
KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1097 29600
AMINI LAKSHADEEP THERMAL-DIESEL 265 509 29600
ANDROTT LAKSHADEEP THERMAL-DIESEL 219 524 29600
KALPENI LAKSHADEEP THERMAL-DIESEL 175 356 29600
AGATTI LAKSHADEEP THERMAL-DIESEL 195 658 29600
KADMAT LAKSHADEEP THERMAL-DIESEL 190 414 29600
KILTAN LAKSHADEEP THERMAL-DIESEL 150 269 29600
CHETLET LAKSHADEEP THERMAL-DIESEL 100 139 29600
BITRA LAKSHADEEP THERMAL-DIESEL 043 024 29600
BANGARAM LAKSHADEEP THERMAL-DIESEL 018 009 29600
Page 37
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) STATE SECTOR
Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 721811 46500
Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 50000 336142 46500
RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 237358 46500
RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 239926 46500
RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 124500 46500
SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 62109 46500
UPPER SILERU APGENCO HYDRO-HYDRO 24000 33000 46500
LOWER SILERU APGENCO HYDRO-HYDRO 46000 81066 46500
DONKARAI APGENCO HYDRO-HYDRO 2500 6007 46500
PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 1262 46500
CHETTIPETA APGENCO HYDRO-HYDRO 100 214 46500
MUCHKUND APGENCO HYDRO-HYDRO 12000 37571 46500
NAGARJUNASAGAR RCPH APGENCO HYDRO-HYDRO 9000 606 46500
TUNGABHADRA HES amp HAMPI(AP
Share)
APGENCO HYDRO-HYDRO 7200 6100 46500
KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 352232 42600
KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 288131 32500
KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 319272 46500
RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 40073 44300
KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 308317 46000
KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 308963 51300
SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 61004 76600
NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 17960 75300
PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 20873 58300
POCHAMPAD-I TSPGENCO HYDRO-HYDRO 2700 5455 29800
POCHAMPAD-II TSPGENCO HYDRO-HYDRO 900 1932 40700
NIZAMSAGAR TSPGENCO HYDRO-HYDRO 1000 1126 53400
RAICHUR TPS 1 to 7 KPCL THERMAL-COAL 147000 890866 43800
RAICHUR TPS 8 KPCL THERMAL-COAL 25000 159523 48200
BELLARI TPS 1 KPCL THERMAL-COAL 50000 318679 51100
BELLARI TPS 2 KPCL THERMAL-COAL 50000 232347 55600
BELLARI TPS 3 KPCL THERMAL-COAL 70000 47565 34400
BHADRA PH KPCL HYDRO-HYDRO 3920 2369 45900
GERUSUPPA PH KPCL HYDRO-HYDRO 24000 26990 22000
GHAT PRABHA HEP KPCL HYDRO-HYDRO 3200 4777 25300
KADRA HPS KPCL HYDRO-HYDRO 15000 16889 26800
NAGJHARI KPCL HYDRO-HYDRO 90000 155159 9800
KODASALLI DPH KPCL HYDRO-HYDRO 12000 14854 19200
MUNIRA+MGH+SPH+SPH KPCL HYDRO-HYDRO 22640 48211 7900
SHARAVATHY HPS KPCL HYDRO-HYDRO 108550 276215 5400
ALMATTI DPH KPCL HYDRO-HYDRO 29000 39611 24600
VARAHI UGPH KPCL HYDRO-HYDRO 46000 71368 15600
IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 17196 15300
IDUKKI HPS KSEB HYDRO-HYDRO 78000 137905 15300
KAKKAD HPS KSEB HYDRO-HYDRO 5000 13063 15300
KALLADA HPS KSEB HYDRO-HYDRO 1500 4436 15300
KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 46544 15300
KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 635 15300
LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 30822 15300
MALANKARA HPS KSEB HYDRO-HYDRO 1050 2474 15300
MATTUPETTY KSEB HYDRO-HYDRO 200 230 15300
MALAMPUZHA KSEB HYDRO-HYDRO 250 063 15300
CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 864 15300
URUMI ST I amp II KSEB HYDRO-HYDRO 615 903 15300
LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 248 15300
NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7765 19625 15300
PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 16601 15300
PANNIAR HPS KSEB HYDRO-HYDRO 3240 6217 15300
PORINGALKUTHU KSEB HYDRO-HYDRO 3600 10052 15300
PORINGALKUTHU LBE KSEB HYDRO-HYDRO 1600 9438 15300
PEPPARA KSEB HYDRO-HYDRO 300 395 15300
POOZHITHODE KSEB HYDRO-HYDRO 480 1045 15300
Page 38
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) PEECHI KSEB HYDRO-HYDRO 125 040 15300
RANI-PERUNADU KSEB HYDRO-HYDRO 400 585 15300
SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 79783 15300
SENGULAM HPS KSEB HYDRO-HYDRO 5120 11558 15300
SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 16711 15300
VILANGAD KSEB HYDRO-HYDRO 750 1578 15300
BARAPOLE KSEB HYDRO-HYDRO 1500 1932 15300
VELLATHOOVAL KSEB HYDRO-HYDRO 360 305 15300
CHIM0NY KSEB HYDRO-HYDRO 250 156 15300
ADYANPARA KSEB HYDRO-HYDRO 350 501 15300
BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 554 15300
KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 3801 15300
KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 23132 32800
ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 14416 62280
METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 523970 62280
METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 321270 62280
NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 336575 62280
NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 591240 62280
TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 508966 62280
KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 30897 62280
VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 18720 90699 62280
KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 33593 62280
BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 1047 62280
PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 1250 62280
PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 330 62280
MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 4897 62280
MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 032 62280
KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15681 62280
KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 40608 62280
KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 21342 62280
KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 4717 62280
KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4322 62280
KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2399 62280
METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 4416 62280
METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 8035 62280
BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2187 62280
BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2359 62280
BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2511 62280
BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 1949 62280
BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 1819 62280
POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 172 62280
SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 241 62280
MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 026 62280
THIRUMOORTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 136 62280
PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 9309 62280
VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 353 62280
SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 4192 62280
PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 6571 62280
SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 1186 62280
SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6319 62280
ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 6122 62280
KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 28674 62280
SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 18381 62280
SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 4258 62280
KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 12680 62280
KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4201 62280
ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 000 62280
PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 19175 62280
AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 078 62280
BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 504 62280
BHAVANI KATTALAI (BKB)(IIIampIII BB I amp II)TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 5847 62280
PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 000 62280
Page 39
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) SRI DAMODARAM STPS APPDCL THERMAL-COAL 160000 808108 36300
PRIVATE SECTOR
KARUPPUR TANJORE LANCO TANJORE PCL THERMAL-GAS 12000 48096 28770
SIMHAPURI ENERGY LTD SIMHAPURI ENERGY LTD THERMAL-COAL 60000 143900 39100
JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 7111 45500
SBU 1 JSW ENERGY LTD
VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 26000 159100
43300
SBU 2 JSW ENERGY LTD
VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 60000 247900
42800
LANCO KPLLANCO KONDAPALLI POWER
LTDTHERMAL-GAS 36814 85060
25776
LANCO KPL STG -IILANCO KONDAPALLI POWER
LTDTHERMAL-GAS 36600 12979
46330
LANCO KPL STG -IIIALANCO KONDAPALLI POWER
LTDTHERMAL-GAS 37100 85710
46330
LANCO KPL STG -III BLANCO KONDAPALLI POWER
LTDTHERMAL-GAS 37100 43639
46330
HINDUJA NATIONAL PCL HINDUJA NATIONAL PCL THERMAL-COAL 104000 303000 38200
MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 121164 49940
UDUPI POWER COR LTD ADANI POWER LTD THERMAL-COAL 120000 754613 42500
SPECTRUM POWER GENERATION
LTD SPECTRUM PG LTD THERMAL-GASN 20525 9256812
34952
TAQA NEYVELI POWER COM PVT
LTD TAQA NEYVELI THERMAL-LIG 25000 5840
34500
ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 251000 51000
ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 207860 36800
GMR VEMAGIRI POWER GENERATION
LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 30117
46450
EASTERN REGION
CENTRAL SECTOR
MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 64675 53113
MTPS STAGE - II KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 39000 1432 69138
BOKARO `B` TPS DVC THERMAL-COAL 63000 145670 31539
MEJIA TPS U 1-3 DVC THERMAL-COAL 63000 348298 31552
MEJIA TPS U 4 DVC THERMAL-COAL 21000 116099 34997
MEJIA TPS U 5-6 DVC THERMAL-COAL 50000 276427 35976
MEJIA TPS U 7-8 DVC THERMAL-COAL 100000 552854 36991
DURGAPUR STEEL TPS DVC THERMAL-COAL 100000 665550 39323
DURGAPUR TPS DVC THERMAL-COAL 21000 59270 35416
RAGHUNATHPUR TPS DVC THERMAL-COAL 120000 201650 35326
MAITHON HYDEL STA DVC HYDRO-HYDRO 6320 12200 17984
CHANDRAPURA TPSU1-3 DVC THERMAL-COAL 42000 257610 35095
CHANDRAPURA TPSU7-8 DVC THERMAL-COAL 50000 306673 34987
KODERMA TPS DVC THERMAL-COAL 100000 380180 38131
PANCHET HPS DVC HYDRO-HYDRO 8000 13360 17984
TILLAYA HPS DVC HYDRO-HYDRO 400 1410 17984
RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34700 35400
TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 277300 23200
TLDP -III NHPC LTD HYDRO-HYDRO 13200 55400 62000
TLDP -IV NHPC LTD HYDRO-HYDRO 16000 60300 25600
FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 957219 33700
FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 308943 41000
BONGAINGAON TPS NTPC LTD THERMAL-COAL 25000 153663 58600
KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 542277 34200
KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 942591 34200
BARH-II NTPC LTD THERMAL-COAL 132000 728021 44500
TALCHER TPS NTPC LTD THERMAL-COAL 46000 335521 30100
TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 702319 25600
TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1436521 24700
STATE SECTOR
BTPS(RampM) BIHAR STATE PGCL THERMAL-COAL 22000 12142 39700
BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 98331 10602
HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 50593 9482
CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 19689 2605
RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 53192 6033
UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 147208 14637
Page 40
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 60353 4519
IB TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 288567 25000
J P H GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 210 038 61100
MEYONG CHU GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 400 1086 61100
TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 122667 38200
DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 214339 43321
KOLAGHAT THERMAL POWER
STATION
WEST BENGAL PDCL THERMAL-COAL 126000 538269 31603
BAKRESHWAR THERMAL POWER
PLANT
WEST BENGAL PDCL THERMAL-COAL 105000 634876 32154
BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 45000 166855 33299
SANTHALDIH THERMAL POWER
STATION
WEST BENGAL PDCL THERMAL-COAL 50000 336442 34932
SAGARDIGHI THERMAL POWER
PROJECT
WEST BENGAL PDCL THERMAL-COAL 160000 423121 34705
JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 20344 68900
RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 24559 68900
TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 4623 68900
PURULIA PUMPED STORAGE
PROJECT
WEST BENGAL SEDCL HYDRO-HYDRO 90000 108816 68900
MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2768 68900
PRIVATE SECTOR
CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 49474 20230
CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 555500 70200
HALDIA ENERGY HALDIA ENERGY LTD THERMAL-COAL 60000 371000 50400
DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3688 63400
KAMALANGA TPS GMR KAMALANGA ENERGY LTD THERMAL-COAL 105000547670
33300
ADHUNIK POWER U-1 ADHUNIK POWER THERMAL-COAL 27000 158 44060
ADHUNIK POWER U-2 ADHUNIK POWER THERMAL-COAL 27000 168 44250
VL-JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 332800 23622
JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 43000 45250
JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 71700 37030
JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 70700 35920
JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 71100 38870
JOJOBERA UNIT 5 TATA POWER COM LTD THERMAL-COAL 12000 79300 44560
JOJOBERA UNIT 6 TATA POWER COM LTD THERMAL-WHR 12000 83700 12840
IEL KALINGANAGAR U-I TATA POWER COM LTD THERMAL-WG 6750 33400 22500
IEL KALINGANAGAR U-II TATA POWER COM LTD THERMAL-WG 6750 34800 22500
MAITHON UNIT 1 amp 2 TATA POWER COM LTD THERMAL-COAL 105000 678000 36100
HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 27500 24340
HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 28400 24340
HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 15800 24310
NORTH EASTERN REGION
CENTRAL SECTOR
LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 74100 36600
AGARTALA GT NEEPCO THERMAL-GAS 13500 88611 27210
ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 153111 32310
DOYANG HEP NEEPCO HYDRO-HYDRO 7500 25598 49801
KOPILI HEP NEEPCO HYDRO-HYDRO 20000 98186 11491
KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 19582 20237
KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 10310 17968
RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 124093 22945
TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 10100 17344 39000
STATE SECTOR
HYDRO POWER (122 Stns) ITANAGAR GOVT OF ARUNACHAL
PRADESHHYDRO-HYDRO 6971 6217270
24600
KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39514 17337
LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 82327 36810
NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 33318 48290
MYNTRIANG SHEP ST II ASSAM POWER GENCO HYDRO-HYDRO 300 567 35776
LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 9130 49200
LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 012 49200
DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 022 49200
TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 000 49200
UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 4990 16000
UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 6476 37000
UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 16494 14600
UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 3600 9556 15000
SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 758 8000
MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44070 44800
KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 154 41400
TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 091 41400
MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 411 41400
MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 394 41400
KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 760 41400
SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 3264 41400
LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 044 41400
BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 18953 28000
ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 43585 28200
GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 4080 11100
Note
LIG Lignite N Naptha WHR Waste Heat Recovery
Page 41
Coal Lignite Gas Diesel Total
State 1634400 25000 287920 000 1947320 000 869755 69956 2887031
Private 2168083 108000 55800 000 2331883 000 251400 1312046 3895329
Central 1233537 25000 234406 000 1492943 162000 849622 37900 2542465
Sub Total 5036020 158000 578126 000 5772146 162000 1970777 1419902 9324825
State 2156000 104000 284982 000 2544982 000 544650 54789 3144421
Private 3474567 50000 467600 000 3992167 000 48100 2186476 6226743
Central 1650295 000 328067 000 1978362 184000 162000 66630 2390992
Sub Total 7280862 154000 1080649 000 8515511 184000 754750 2307894 11762155
State 1993250 000 79198 28788 2101236 000 1177483 58688 3337407
Private 1187450 25000 532210 27370 1772030 000 000 3749140 5521170
Central 1123502 289000 35958 000 1448460 332000 000 54190 1834650
Sub Total 4304202 314000 647366 56158 5321726 332000 1177483 3862018 10693227
State 624000 000 10000 000 634000 000 353792 27511 1015303
Private 638700 000 000 000 638700 000 39900 111637 790237
Central 1483664 000 000 000 1483664 000 100520 1000 1585184
Sub Total 2746364 000 10000 000 2756364 000 494212 140148 3390724
State 000 000 49771 3600 53371 000 42200 23325 118895
Private 000 000 2450 000 2450 000 000 6104 8554
Central 77002 000 125360 000 202362 000 100500 3000 305862
Sub Total 77002 000 177581 3600 258183 000 142700 32429 433311
State 000 000 000 4005 4005 000 000 525 4530
Private 000 000 000 000 000 000 000 738 738
Central 000 000 000 000 000 000 000 510 510
Sub Total 000 000 000 4005 4005 000 000 1773 5778
State 6407650 129000 711871 36393 7284913 000 2987880 234793 10507586
Private 7468800 183000 1058060 27370 8737230 000 339400 7366140 16442770
Central 5568000 314000 723791 000 6605791 678000 1212642 163230 8659663
Total 19444450 626000 2493722 63763 22627934 678000 4539922 7764163 35610019
Figures at decimal may not tally due to rounding off
Note -
(As per latest information available with MNRE)
Break up of RES all India as on 31032019 is given below (in MW)
459315 3562597 2818071 7764163
A 0 MW
B Apr 2019 0 MW
C
Apr 2019 0 MW
D Net Capacity Added during Apr 2019 A-B-C 0 MW
Sector wise breakup of RES capacity as shown is provisional
Share of installed capacity of BBMB Stations is included in state sector of partner states
BM PowerCogen Waste to Energy
910350 13830
Capacity Added during Apr 2019
Capacity Retired during
Capacity removed due to change
from Conventional to RES during
Islands
ALL INDIA
Abbreviation- SHP=Small Hydro Project (le 25 MW) BP=Biomass Power UampI=Urban amp Industrial Waste Power RES=Renewable Energy Sources
1 RES include SHP BP UampI Solar and Wind Energy Installed capacity in respect of RES (MNRE) as on 31032019
Small
Hydro PowerWind Power
Bio-PowerSolar Power
Total
Capacity
RES
(MNRE)
Northern Region
Western Region
Southern Region
Eastern Region
North Eastern
Region
ALL INDIA INSTALLED CAPACITY (IN MW) OF POWER STATIONS
(As on 30042019)
(UTILITIES)
Region Ownership Sector
Mode wise breakup
Grand TotalThermalNuclear Hydro
Coal Lignite Gas Diesel Total
State 13500 000 180040 000 193540 000 000 000 193540
Private 86922 000 10800 000 97722 000 000 17889 115611
Central 311272 000 20701 000 331973 10283 72309 000 414565
Sub-Total 411694 000 211541 000 623235 10283 72309 17889 723716
State 272000 000 15000 000 287000 000 110282 6930 404212
Private 408078 000 000 000 408078 000 20000 34512 462590
Central 129472 000 53561 000 183034 10094 66370181 500 259998
Sub-Total 809550 000 68561 000 878112 10094 196652 41942 1126799
State 000 000 000 000 000 000 69460 25661 95121
Private 000 000 000 000 000 000 99200 62668 161868
Central 18340 000 6201 000 24541 2895 122388 000 149824
Sub-Total 18340 000 6201 000 24541 2895 291048 88329 406813
State 000 000 17500 000 17500 000 123000 12903 153403
Private 000 000 000 000 000 000 000 6483 6483
Central 50639 000 12907 000 63547 6798 109188 000 179533
Sub-Total 50639 000 30407 000 81047 6798 232188 19386 339419
State 176000 000 15000 000 191000 000 259770 12780 463550
Private 511550 000 000 000 511550 000 28800 115462 655812
Central 85458 000 26401 000 111859 19681 92342 000 223882
Sub-Total 773008 000 41401 000 814409 19681 380912 128242 1343244
State 626000 25000 60380 000 711380 000 109618 2385 823383
Private 280200 108000 000 000 388200 000 10400 730181 1128781
Central 95625 25000 22110 000 142735 55674 73901 34400 306710
Sub-Total 1001825 158000 82490 000 1242315 55674 193919 766966 2258874
State 546900 000 000 000 546900 000 72410 2510 621820
Private 871433 000 000 000 871433 000 84200 288760 1244393
Central 379639 000 54949 000 434588 28948 180253 3000 646789
Sub-Total 1797972 000 54949 000 1852921 28948 336863 294270 2513002
State 000 000 000 000 000 000 125215 6787 132002
Private 9900 000 45000 000 54900 000 8800 52620 116320
Central 34324 000 6966 000 41290 3124 47554 000 91968
Sub-Total 44224 000 51966 000 96190 3124 181569 59407 340290
State 000 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 000 3471 3471
Central 3815 000 1503 000 5317 801 10171 000 16289
Sub-Total 3815 000 1503 000 5317 801 10171 3471 19760
124953 000 29105 000 154058 23703 75145 000 252907
State 1634400 25000 287920 000 1947320 000 869755 69956 2887031
Private 2168083 108000 55800 000 2331883 000 251400 1312046 3895329
Central 1233537 25000 234406 000 1492943 162000 849622 37900 2542465
Grand Total 5036020 158000 578126 000 5772146 162000 1970777 1419902 9324825
Delhi
Haryana
Himachal Pradesh
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
NORTHERN REGION
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
(As on 30042019)
State Ownership Sector
Mode wise breakup
Grand TotalThermalNuclear Hydro
RES
(MNRE)
Jammu amp Kashmir
Punjab
Rajasthan
Uttar Pradesh
Uttarakhand
Chandigarh
Central - Unallocated
Total (Northern
Region)
(As on 30042019)
Coal Lignite Gas Diesel Total
State 000 000 000 000 000 000 000 005 005
Private 000 000 4800 000 4800 000 000 392 5192
Central 46959 000 1967 000 48926 2600 000 000 51526
Sub-Total 46959 000 6767 000 53726 2600 000 397 56723
State 000 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 000 1447 1447
Central 14141 000 4334 000 18475 700 000 000 19175
Sub-Total 14141 000 4334 000 18475 700 000 1447 20622
State 371000 104000 217782 000 692782 000 77200 6470 776452
Private 726567 50000 396000 000 1172567 000 000 833180 2005747
Central 324243 000 42400 000 366643 55900 000 24330 446873
Sub-Total 1421810 154000 656182 000 2231992 55900 77200 863980 3229072
State 540000 000 000 000 540000 000 170366 8396 718762
Private 617400 000 10000 000 627400 000 000 418040 1045440
Central 334238 000 25700 000 359938 27300 152000 30000 569238
Sub-Total 1491638 000 35700 000 1527338 27300 322366 456436 2333440
State 228000 000 000 000 228000 000 12000 1105 241105
Private 885000 000 000 000 885000 000 000 52430 937430
Central 211075 000 000 000 211075 4800 10000 000 225875
Sub-Total 1324075 000 000 000 1324075 4800 22000 53535 1404410
State 1017000 000 67200 000 1084200 000 285084 38813 1408097
Private 1245600 000 56800 000 1302400 000 48100 880441 2230941
Central 466780 000 227273 000 694053 69000 000 12300 775353
Sub-Total 2729380 000 351273 000 3080653 69000 333184 931553 4414390
State 000 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 000 546 546
Central 19560 000 6634 000 26194 900 000 000 27094
Sub-Total 19560 000 6634 000 26194 900 000 546 27640
233300 000 19759 000 253059 22800 000 000 275859
State 2156000 104000 284982 000 2544982 000 544650 54789 3144421
Private 3474567 50000 467600 000 3992167 000 48100 2186476 6226743
Central 1650295 000 328067 000 1978362 184000 162000 66630 2390992
Grand Total 7280862 154000 1080649 000 8515511 184000 754750 2307894 11762155
Goa
Daman amp Diu
Gujarat
Madhya Pradesh
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
WESTERN REGION
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
ThermalNuclear Hydro
RES
(MNRE)
State Ownership Sector
Mode wise breakup
Grand Total
Chhattisgarh
Maharashtra
Dadra amp Nagar
Naveli
Central - Unallocated
Total (Western
Region)
(As on 30042019)
Coal Lignite Gas Diesel Total
State 501000 000 23540 000 524540 000 167360 5618 697518
Private 387388 000 381318 3680 772386 000 000 743342 1515728
Central 154683 12773 000 000 167456 12727 000 25000 205183
Sub-Total 1043071 12773 404858 3680 1464382 12727 167360 773960 2418429
State 558250 000 000 000 558250 000 247993 4122 810365
Private 83945 000 83182 000 167127 000 000 393644 560771
Central 180685 14927 000 000 195612 14873 000 1000 211485
Sub-Total 822880 14927 83182 000 920989 14873 247993 398766 1582621
State 502000 000 000 12792 514792 000 358660 19389 892841
Private 195850 000 000 2520 198370 000 000 1363591 1561961
Central 242780 40140 000 000 282920 69800 000 000 352720
Sub-Total 940630 40140 000 15312 996082 69800 358660 1382979 2807521
State 000 000 000 15996 15996 000 185650 17290 218936
Private 61500 000 17400 000 78900 000 000 19021 97921
Central 86142 28180 35958 000 150280 36200 000 5000 191480
Sub-Total 147642 28180 53358 15996 245176 36200 185650 41311 508337
State 432000 000 52408 000 484408 000 217820 12270 714498
Private 458767 25000 50310 21170 555247 000 000 1229228 1784475
Central 302532 136420 000 000 438952 144800 000 23190 606942
Sub-Total 1193299 161420 102718 21170 1478607 144800 217820 1264688 3105915
State 000 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 000 000 000
Central 000 10000 000 000 10000 000 000 000 10000
Sub-Total 000 10000 000 000 10000 000 000 000 10000
State 000 000 3250 000 3250 000 000 000 3250
Private 000 000 000 000 000 000 000 314 314
Central 14080 10760 000 000 24840 8600 000 000 33440
Sub-Total 14080 10760 3250 000 28090 8600 000 314 37004
142600 35800 000 000 178400 45000 000 000 223400
State 1993250 000 79198 28788 2101236 000 1177483 58688 3337407
Private 1187450 25000 532210 27370 1772030 000 000 3749140 5521170
Central 1123502 289000 35958 000 1448460 332000 000 54190 1834650
Grand Total 4304202 314000 647366 56158 5321726 332000 1177483 3862018 10693227
Kerala
Andhra Pradesh
Telangana
Karnataka
Total (Southern
Region)
Tamil Nadu
NLC
Puducherry
Central - Unallocated
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
SOUTHERN REGION
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
State Ownership Sector
Mode wise breakup
Grand TotalThermalNuclear Hydro
RES
(MNRE)
(As on 30042019)
Coal Lignite Gas Diesel Total
State 000 000 000 000 000 000 000 7070 7070
Private 28100 000 000 000 28100 000 000 25545 53645
Central 384933 000 000 000 384933 000 11000 000 395932
Sub-Total 413033 000 000 000 413033 000 11000 32615 456647
State 42000 000 000 000 42000 000 13000 405 55405
Private 73000 000 000 000 73000 000 000 3495 76495
Central 39374 000 000 000 39374 000 6100 000 45474
Sub-Total 154374 000 000 000 154374 000 19100 3900 177374
State 540000 000 10000 000 550000 000 98600 12195 660795
Private 243700 000 000 000 243700 000 000 35250 278950
Central 76077 000 000 000 76077 000 41000 000 117077
Sub-Total 859777 000 10000 000 869777 000 139600 47445 1056822
State 000 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 000 000 000
Central 698504 000 000 000 698504 000 18620 000 717124
Sub-Total 698504 000 000 000 698504 000 18620 000 717124
State 42000 000 000 000 42000 000 206192 2630 250822
Private 293900 000 000 000 293900 000 000 47346 341246
Central 163390 000 000 000 163390 000 8900 1000 173290
Sub-Total 499290 000 000 000 499290 000 215092 50976 765358
State 000 000 000 000 000 000 36000 5211 41211
Private 000 000 000 000 000 000 39900 001 39901
Central 8703 000 000 000 8703 000 6400 000 15103
Sub-Total 8703 000 000 000 8703 000 82300 5212 96215
112683 000 000 000 112683 000 8501 000 121184
State 624000 000 10000 000 634000 000 353792 27511 1015303
Private 638700 000 000 000 638700 000 39900 111637 790237
Central 1483664 000 000 000 1483664 000 100520 1000 1585184
Grand Total 2746364 000 10000 000 2756364 000 494212 140148 3390724
Total (Eastern
Region)
Bihar
Jharkhand
West Bengal
DVC
Odisha
Sikkim
Central - Unallocated
HydroOwnership Sector
Mode wise breakup
Grand TotalThermalNuclear
RES
(MNRE)
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
State
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
EASTERN REGION
(As on 30042019)
Coal Lignite Gas Diesel Total
State 000 000 32821 000 32821 000 10000 501 43322
Private 000 000 2450 000 2450 000 000 2650 5100
Central 40852 000 43556 000 84408 000 35708 2500 122616
Sub-Total 40852 000 78827 000 119679 000 45708 5651 171038
State 000 000 000 000 000 000 000 10711 10711
Private 000 000 000 000 000 000 000 2939 2939
Central 3705 000 4682 000 8387 000 11655 000 20042
Sub-Total 3705 000 4682 000 8387 000 11655 13650 33692
State 000 000 000 000 000 000 32200 3253 35453
Private 000 000 000 000 000 000 000 012 012
Central 4560 000 10969 000 15529 000 7227 000 22756
Sub-Total 4560 000 10969 000 15529 000 39427 3265 58221
State 000 000 16950 000 16950 000 000 1601 18551
Private 000 000 000 000 000 000 000 009 009
Central 5610 000 43695 000 49305 000 6849 500 56654
Sub-Total 5610 000 60645 000 66255 000 6849 2110 75214
State 000 000 000 3600 3600 000 000 545 4145
Private 000 000 000 000 000 000 000 344 344
Central 4710 000 7157 000 11867 000 9534 000 21401
Sub-Total 4710 000 7157 3600 15467 000 9534 889 25890
State 000 000 000 000 000 000 000 3067 3067
Private 000 000 000 000 000 000 000 100 100
Central 3210 000 4893 000 8103 000 5733 000 13836
Sub-Total 3210 000 4893 000 8103 000 5733 3167 17003
State 000 000 000 000 000 000 000 3647 3647
Private 000 000 000 000 000 000 000 050 050
Central 3105 000 4046 000 7151 000 9794 000 16945
Sub-Total 3105 000 4046 000 7151 000 9794 3697 20642
11250 000 6362 000 17612 000 14000 000 31612
State 000 000 49771 3600 53371 000 42200 23325 118895
Private 000 000 2450 000 2450 000 000 6104 8554
Central 77002 000 125360 000 202362 000 100500 3000 305862
Grand Total 77002 000 177581 3600 258183 000 142700 32429 433311
Assam
Arunachal Pradesh
Meghalaya
Tripura
Manipur
Nagaland
Mizoram
Central - Unallocated
Total (North-
Eastern Region)
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
NORTH-EASTERN REGION
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
State Ownership Sector
Mode wise breakup
Grand TotalThermalNuclear Hydro
RES
(MNRE)
(As on 30042019)
Coal Lignite Gas Diesel Total
State 000 000 000 4005 4005 000 000 525 4530
Private 000 000 000 000 000 000 000 663 663
Central 000 000 000 000 000 000 000 510 510
Sub-Total 000 000 000 4005 4005 000 000 1698 5703
State 000 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 000 075 075
Central 000 000 000 000 000 000 000 000 000
Sub-Total 000 000 000 000 000 000 000 075 075
State 000 000 000 4005 4005 000 000 525 4530
Private 000 000 000 000 000 000 000 738 738
Central 000 000 000 000 000 000 000 510 510
Grand Total 000 000 000 4005 4005 000 000 1773 5778
Andaman amp
Nicobar
Lakshadweep
Total (Islands)
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
ISLANDS
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
State Ownership Sector
Mode wise breakup
Grand TotalThermalNuclear Hydro
RES
(MNRE)
SrNo Contents Page
1 Executive summary of Target and Achievement of Transmission Lines during 2019-20
20(1)
2 List of Transmission Lines CommissionedReady for commissioning during Apr-2019 20(2)
Section C - Transmission Lines
1 Executive summary of Target and Achievement of Transmission Lines during 2019-20 As on 30-04-19
(All figures in circuit kms)
Ce
ntr
al S
ecto
r
Sta
te S
ecto
r
JV
Pri
va
te S
ecto
r
To
tal
Ce
ntr
al S
ecto
r
Sta
te S
ecto
r
JV
Pri
va
te S
ecto
r
To
tal
Ce
ntr
al S
ecto
r
Sta
te S
ecto
r
JV
Pri
va
te S
ecto
r
To
tal
Ce
ntr
al S
ecto
r
Sta
te S
ecto
r
JV
Pri
va
te S
ecto
r
To
tal
Ce
ntr
al S
ecto
r
Sta
te S
ecto
r
JV
Pri
va
te S
ecto
r
To
tal
Ce
ntr
al
Se
cto
r
Sta
te S
ec
tor
JV
Pri
va
te S
ec
tor
Gra
nd
To
tal
0 0 0 0 0 0 0 0 2727 958 2334 6019 2239 3416 1143 6798 781 10023 0 10804 5747 14397 3477 23621
Apr19 Programme 0 0 0 0 0 0 0 0 577 416 557 1550 60 890 203 1153 0 309 0 309 637 1615 760 3012
Achievement 0 0 0 0 0 0 0 0 53 0 0 53 0 20 0 20 0 401 0 401 53 421 0 474
Upto Apr-19 Programme 0 0 0 0 0 0 0 0 577 416 557 1550 60 890 203 1153 0 309 0 309 637 1615 760 3012
Achievement 0 0 0 0 0 0 0 0 53 0 0 53 0 20 0 20 0 401 0 401 53 421 0 474
20(1)
220 kV Grand Total 800 kV 500 kV
Programme 2019-20
Programme
Achievement
HVDC765 kV 400 kV
Line
1 2 3 4 5 6
1 400 Bhadla (PG) - Bhadla (RVPN) line DC PGCIL 53
53
2 400 LILO of one ckt Jhanor - Navsari at Vav Ss DC GETCO 20
3 220 Banda-Chitrakoot Line DC UPPTCL 226
4 220 Gorakhpur (PG)-Gola line DC UPPTCL 82
5 220 Hapur(765) - Faridnagar line SC UPPTCL 11
6 220 Kalikiri - Madanapalli line DC APTRANSCO 60
7 220LILO of Gr Noida -Noida Sec-129 at Noida
Sec-148DC UPPTCL 1
8 220LILO of one Ckt of Badshahpur Pali at Sec-
65 GurgaonDC HVPNL 3
9 220 Sultanpur-Sangipur LILO Section at Amethi DC UPPTCL 18
421
0
474
20(2)
Grand Total
2Transmission Lines (220 kV and above) CommissionedReady for commissioning During Apr-2019
Voltage
Level (kV)Name of Transmission Lines
Circuit
Type
Executing
Agency
CENTRAL SECTOR
Total of CENTRAL SECTOR
STATE SECTOR Sector
Total of STATE SECTOR
PRIVATE SECTOR
Total of PRIVATE SECTOR
SlNo
Length(CKm)
As on 30-04-19
SN Contents Page
1 Executive summary of Target and Achievement of Substations during 2019-20 21(1)
2Sub Stations (220 kV and above) commissionedready for commisssioning during Apr-
201921(2)
Section D - Sub Stations
1 Executive summary of Target and Achievement of Substations during 2019-2020 As on 30-04-19
(All figures in circuit MVA)
Ce
ntr
al S
ecto
r
Sta
te S
ecto
r
JV
Pri
va
te S
ecto
r
To
tal
Ce
ntr
al S
ecto
r
Sta
te S
ecto
r
JV
Pri
va
te S
ecto
r
To
tal
Ce
ntr
al S
ecto
r
Sta
te S
ecto
r
JV
Pri
va
te S
ecto
r
To
tal
Ce
ntr
al S
ecto
r
Sta
te S
ecto
r
JV
Pri
va
te S
ecto
r
To
tal
Ce
ntr
al S
ecto
r
Sta
te S
ecto
r
JV
Pri
va
te S
ecto
r
To
tal
Ce
ntr
al S
ec
tor
Sta
te S
ec
tor
JV
Pri
va
te S
ec
tor
Gra
nd
To
tal
3000 0 0 3000 0 0 0 0 18000 3000 6000 27000 5205 19665 4260 29130 800 21786 0 22586 27005 44451 10260 81716
Apr19 Programme 0 0 0 0 0 0 0 0 3000 0 3000 6000 0 1000 2000 3000 0 800 0 800 3000 1800 5000 9800
Achievement 0 0 0 0 0 0 0 0 500 0 0 500 815 1980 0 2795 0 1305 0 1305 1315 3285 0 4600
Upto Apr-19 Programme 0 0 0 0 0 0 0 0 3000 0 3000 6000 0 1000 2000 3000 0 800 0 800 3000 1800 5000 9800
Achievement 0 0 0 0 0 0 0 0 500 0 0 500 815 1980 0 2795 0 1305 0 1305 1315 3285 0 4600
21(1)
220 kV Grand Total 800 kV 500 kV
Programme 2019-20
Programme
Achievement
HVDC765 kV 400 kV
As on 30-04-19
Sl Voltage Ratio Capacity
No (kVkV) (MWMVA)
1 2 3 4 5
1 Bhadla SS (3x1500 3x500 MVA) 765400 PGCIL 500
2 Extn at Tumkur (Pavagada ) PS (2x500 MVA) 400220 PGCIL 500
3 Bongaigaon (2nd ICT) Ss 400220 PGCIL 315
Total of CENTRAL SECTOR 1315
4 Motiram Adda Gorakhpur (Aug) (Additional TF) 400220 UPPTCL 240
5 Muradnagar-II Ghaziabad (Aug) (Additional TF) 400220 UPPTCL 240
6 Noida Sec- 148 GBNagar (New) 400220 UPPTCL 5007 Sarnath Varanasi (Aug) TF- II (500-315) 400220 UPPTCL 1858 Sarojininagar Lucknow Aug) TF- II (500-315) 400220 UPPTCL 185
9 Unnao (Aug) TF-III 400220 UPPTCL 31510 Nawada SS 400220 HVPNL 31511 Kharepatan SS 22033 MSETCL 2512 Prathipadu SS 220132 APTRANSCO 10013 Pali Ss 22066 HVPNL 160
14 A-5 Faridabad Ss 22066 HVPNL 60
15 Rentachintala Ss Aug(3X100-2x100) 220132 APTRANSCO 10016 Amethi Ss 220132 UPPTCL 160
17 Gajokhar Varanasi (Aug) TF- II (160-100) 220132 UPPTCL 60
18 Gola Gorakhpur (New) 220132 UPPTCL 160
19 Khurja Bulandshahr (Aug) TF- II (200-160) 220132 UPPTCL 40
20 RC Green GB Nagar (Aug) TF-II (160-100) 220132 UPPTCL 60
21 Sikandrabad Bulandshahr (Aug) (Additional TF) 220132 UPPTCL 160
22 Sitapur (Aug) (Additional TF) 220132 UPPTCL 160
23 Sohawal Ayodhya (Aug) TF-II (160-100) 220132 UPPTCL 60
TOTAL STATE SECTOR 3285
GRAND TOTAL 4600
21(2)
CENTRAL SECTOR
STATE SECTOR
2Sub-Stations (220 kV and above) CommissionedReady for commissioning During Apr-2019
Name of Sub Stations Executing Agency
SN Contents Page
1 Electricity Generation (MU) Targets and Achievements for 2019-20 22
Section E - Electricity Generation
Programme Achievement Ach Programme Achievement Ach
Central Sector 37545100 3177900 3129530 9848 3177900 3129530 9848
State Sector 37498600 3322500 2950558 8881 3322500 2950558 8881
PvtIPP Sector 37346200 3236400 3195940 9875 3236400 3195940 9875
PvtUTL Sector 1823100 159300 165579 10394 159300 165579 10394
Total 114213000 9896100 9441607 9541 9896100 9441607 9541
Central Sector 5661700 386100 481390 12468 386100 481390 12468
State Sector 6680500 498200 536514 10769 498200 536514 10769
PvtIPP Sector 1206900 57300 80405 14032 57300 80405 14032
PvtUTL Sector 144100 12300 10930 8886 12300 10930 8886
Total 13693200 953900 1109239 11628 953900 1109239 11628
Central Sector 4472000 367300 317765 8651 367300 317765 8651
Total 4472000 367300 317765 8651 367300 317765 8651
Bhutan Import 621800 17500 24396 13941 17500 24396 13941
Central Sector 47678800 3931300 3928685 9993 3931300 3928685 9993
State Sector 44179100 3820700 3487072 9127 3820700 3487072 9127
Pvt Sector 40520300 3465300 3452854 9964 3465300 3452854 9964
Total 133000000 11234800 10893007 9696 11234800 10893007 9696
Provisional based on actual-cum-Assesment
Figs in MU
Cummulative
Achievement
Cummulative
Achievement
Mar-19 Mar-18 Upto Mar-2019 Upto Mar-2018
984785 869291 12675910 10183949
22
1 Electricity Generation (MU) Targets and Achievememts for 2019-20
All India Energy Generation During Apr-19 to Apr-19 (MU)
Target (2019-20)Apr-19 to Apr-19
Sector
Hydro
Thermal
Nuclear
Renewable Energy Generation
Achievement
Apr-2019
98961
95393673
112348
94416
11092
3178
108930
0
20000
40000
60000
80000
100000
120000
Thermal Hydro Nuclear Total
Programme
Achievement
SN Contents Page
1 Energy Power Supply Position (Provisional) for Apr-2019 and during Apr-19 to Apr-19 23
2 Peak Power Supply Position (Provisional) for Apr-2019 and during Apr-19 to Apr-19 24
3 Energy Power Supply Position (Revised) for Mar-2019 and during Apr-19 to Mar-19 25
4 Peak Power Supply Position (Revised) for Mar-2019 and during Apr-19 to Mar-19 26
5 Notified Power cuts Restrictions on Industries during Apr-2019 27
6 Power Supply to Agricultural Sector during Apr-2019 28
Section F - Power supply position
आकड़ मममलयन यननट नट Figures in MU net
ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied
कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )
चडीगढ़ Chandigarh 117 117 0 00 117 117 0 00
दिलली Delhi 2698 2698 1 00 2698 2698 1 00
हरियजणज Haryana 3773 3773 0 00 3773 3773 0 00
दहमजचल परिश Himachal Pradesh 777 777 0 00 777 777 0 00
रमम कशमीि Jammu amp Kashmir 1604 1296 308 192 1604 1296 308 192
परजब Punjab 3646 3646 0 00 3646 3646 0 00
िजरसथजन Rajasthan 6210 6208 2 00 6210 6208 2 00
उतति परिश Uttar Pradesh 10179 10148 32 03 10179 10148 32 03
उततिजखड Uttarakhand 1120 1120 0 00 1120 1120 0 00
उततरी कषतर Northern Region 30094 29786 308 10 30094 29786 308 10
छततीसगढ़ Chhattisgarh 2684 2676 8 03 2684 2676 8 03
गरिजत Gujarat 10718 10718 0 00 10718 10718 0 00
मधय परिश Madhya Pradesh 6006 6006 0 00 6006 6006 0 00
महजिजषटर Maharashtra 14308 14308 0 00 14308 14308 0 00
िमन औि दिउ Daman amp Diu 220 220 0 00 220 220 0 00
िजिि व नगि हवली Dadra amp Nagar Haveli 552 552 0 00 552 552 0 00
गोवज Goa 388 388 0 00 388 388 0 00
पशचिमी कषतर Western Region 34875 34868 8 00 34875 34868 8 00
आनधर परिश Andhra Pradesh 5708 5708 0 00 5708 5708 0 00
तलगजनज Telangana 5725 5725 0 00 5725 5725 0 00
कनजाटक Karnataka 7003 7003 0 00 7003 7003 0 00
किल Kerala 2402 2400 2 01 2402 2400 2 01
तममल नजड Tamil Nadu 10010 10010 0 00 10010 10010 0 00
पडचिी Puducherry 263 263 0 00 263 263 0 00
लकष-दवीप Lakshadweep 4 4 0 0 4 4 0 0
दकषकषणी कषतर Southern Region 31111 31109 2 00 31111 31109 2 00
बबहजि Bihar 2589 2589 0 00 2589 2589 0 00
िजमोिि घजटी ननगम DVC 1772 1772 0 00 1772 1772 0 00
झजिखणड Jharkhand 689 689 0 00 689 689 0 00
ओडडशज Odisha 2689 2689 1 00 2689 2689 1 00
पशशचम बगजल West Bengal 5075 5075 0 00 5075 5075 0 00
मसशककम Sikkim 37 37 0 00 37 37 0 00
अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 7 29 27 2 7
परवी कषतर Eastern Region 12851 12850 1 00 12851 12850 1 00
अरणजचल परिश Arunachal Pradesh 66 66 0 05 66 66 0 05
असम Assam 766 709 57 75 766 709 57 75
मणणपि Manipur 68 67 1 15 68 67 1 15
मघजलय Meghalaya 170 160 10 59 170 160 10 59
ममज़ोिम Mizoram 54 53 0 08 54 53 0 08
नजगजलड Nagaland 54 54 0 08 54 54 0 08
बिपिज Tripura 122 120 1 12 122 120 1 12
उततर-परवी कषतर North-Eastern Region 1300 1228 71 55 1300 1228 71 55
समपणण भारत All India 110231 109842 389 04 110231 109842 389 04
23
ऊरजा पनत ा म कमी ऊरजा पनत ा म कमीEnergy not Supplied
Excludes energy exported to Bangladesh
Energy not Supplied
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
ऊराण वरवदयत आपरत ण शथिरत ररपोरण (परवाणरवलोकन) Energy Power Supply Position Report (Provisional)
राजयState
अपरल 2019 April2019 अपरल2019 -अपरल2019 April2019 to April2019
अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met
कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )
चडीगढ़ Chandigarh 256 256 0 00 256 256 0 00
दिलली Delhi 5664 5664 0 00 5664 5664 0 00
हरियजणज Haryana 8127 8127 0 00 8127 8127 0 00
दहमजचल परिश Himachal Pradesh 1387 1387 0 00 1387 1387 0 00
रमम कशमीि Jammu amp Kashmir 2826 2261 565 200 2826 2261 565 200
परजब Punjab 7015 7015 0 00 7015 7015 0 00
िजरसथजन Rajasthan 10560 10560 0 00 10560 10560 0 00
उतति परिश Uttar Pradesh 19935 19935 0 00 19935 19935 0 00
उततिजखड Uttarakhand 1922 1922 0 00 1922 1922 0 00
उततरी कषतर Northern Region 54476 53985 491 09 54476 53985 491 09
छततीसगढ़ Chhattisgarh 4596 4574 22 05 4596 4574 22 05
गरिजत Gujarat 17871 17865 6 00 17871 17865 6 00
मधय परिश Madhya Pradesh 10018 10018 0 00 10018 10018 0 00
महजिजषटर Maharashtra 23158 23150 8 00 23158 23150 8 00
िमन औि दिउ Daman amp Diu 341 340 1 02 341 340 1 02
िजिि व नगि हवली Dadra amp Nagar Haveli 818 818 0 00 818 818 0 00
गोवज Goa 594 594 0 00 594 594 0 00
पशचिमी कषतर Western Region 56242 56222 20 00 56242 56222 20 00
आनधर परिश Andhra Pradesh 9151 9151 0 00 9151 9151 0 00
तलगजनज Telangana 10191 10191 0 00 10191 10191 0 00
कनजाटक Karnataka 12681 12681 0 00 12681 12681 0 00
किल Kerala 4309 4300 8 02 4309 4300 8 02
तममल नजड Tamil Nadu 15972 15972 0 00 15972 15972 0 00
पडचिी Puducherry 482 480 2 05 482 480 2 05
लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0
दकषकषणी कषतर Southern Region 49155 49103 52 01 49155 49103 52 01
बबहजि Bihar 5357 5357 0 00 5357 5357 0 00
िजमोिि घजटी ननगम DVC 3039 3039 0 00 3039 3039 0 00
झजिखणड Jharkhand 1266 1266 0 00 1266 1266 0 00
ओडडशज Odisha 5389 5389 0 00 5389 5389 0 00
पशशचम बगजल West Bengal 8666 8666 0 00 8666 8666 0 00
मसशककम Sikkim 100 100 0 00 100 100 0 00
अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7
परवी कषतर Eastern Region 23349 23349 0 00 23349 23349 0 00
अरणजचल परिश Arunachal Pradesh 139 136 3 22 139 136 3 22
असम Assam 1712 1667 45 26 1712 1667 45 26
मणणपि Manipur 197 188 9 46 197 188 9 46
मघजलय Meghalaya 336 336 0 00 336 336 0 00
ममज़ोिम Mizoram 116 113 3 26 116 113 3 26
नजगजलड Nagaland 157 131 26 166 157 131 26 166
बिपिज Tripura 292 291 1 03 292 291 1 03
उततर-परवी कषतर North-Eastern Region 2848 2780 68 24 2848 2780 68 24
समपणण भारत All India 177411 176810 601 03 177411 176810 601 03
24
मजग की पनत ा म कमी Demand not Met
Excludes the supply to Bangladesh
राजयStateअपरल 2019 April2019
मजग की पनत ा म कमी Demand not Met
अधिकतम वरवदयत आपरत ण शथिरत ररपोरण (परवाणरवलोकन) Peak Power Supply Position Report (Provisional)
आकड़ मगज वजट नट Figures in MW netअपरल2019 -अपरल2019 April2019 to April2019
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
आकड़ मममलयन यननट नट Figures in MU net
ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied
कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )
चडीगढ़ Chandigarh 96 96 0 00 1561 1561 0 00
दिलली Delhi 1931 1930 1 00 32299 32282 17 01
हरियजणज Haryana 3658 3658 0 00 53665 53665 0 00
दहमजचल परिश Himachal Pradesh 832 830 2 02 9850 9618 232 24
रमम कशमीि Jammu amp Kashmir 1767 1414 353 200 19593 15868 3725 190
परजब Punjab 3585 3585 0 00 55288 55275 13 00
िजरसथजन Rajasthan 6774 6770 4 01 79826 79637 189 02
उतति परिश Uttar Pradesh 8754 8691 63 07 117101 116118 984 08
उततिजखड Uttarakhand 1067 1067 0 00 13845 13753 92 07
उततरी कषतर Northern Region 28464 28041 423 15 383028 377776 5251 14
छततीसगढ़ Chhattisgarh 2464 2457 8 03 26130 26076 54 02
गरिजत Gujarat 9890 9890 0 00 116588 116572 15 00
मधय परिश Madhya Pradesh 6236 6236 0 00 75667 75665 2 00
महजिजषटर Maharashtra 13631 13631 0 00 158285 158148 137 01
िमन औि दिउ Daman amp Diu 221 221 0 00 2557 2557 0 00
िजिि व नगि हवली Dadra amp Nagar Haveli 553 553 0 00 6317 6317 0 00
गोवज Goa 362 362 0 00 4283 4280 3 01
पशचिमी कषतर Western Region 33357 33349 8 00 389827 389615 212 01
आनधर परिश Andhra Pradesh 6072 6071 1 00 63735 63677 58 01
तलगजनज Telangana 6930 6929 1 00 66697 66635 62 01
कनजाटक Karnataka 7614 7612 1 00 71759 71690 69 01
किल Kerala 2489 2488 1 00 25029 24911 118 05
तममल नजड Tamil Nadu 10247 10245 2 00 109375 109273 102 01
पडचिी Puducherry 252 251 1 04 2761 2751 10 03
लकष-दवीप Lakshadweep 4 4 0 0 46 46 0 0
दकषकषणी कषतर Southern Region 33605 33597 8 00 339355 338938 417 01
बबहजि Bihar 2319 2318 1 00 30052 29827 225 07
िजमोिि घजटी ननगम DVC 1773 1772 1 00 22365 21995 369 17
झजिखणड Jharkhand 698 697 1 01 8682 8461 221 25
ओडडशज Odisha 2583 2582 1 00 31810 31781 30 01
पशशचम बगजल West Bengal 4585 4584 2 00 52237 52078 159 03
मसशककम Sikkim 41 41 0 00 513 512 0 01
अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 67 346 323 23 67
परवी कषतर Eastern Region 11999 11995 5 00 145658 144654 1004 07
अरणजचल परिश Arunachal Pradesh 61 60 0 06 864 855 9 10
असम Assam 680 656 23 34 9532 9204 328 34
मणणपि Manipur 68 68 1 09 916 906 10 11
मघजलय Meghalaya 173 173 0 03 1955 1953 1 01
ममज़ोिम Mizoram 50 49 0 09 668 661 8 12
नजगजलड Nagaland 58 57 1 20 902 809 93 103
बिपिज Tripura 150 150 0 00 1859 1837 21 11
उततर-परवी कषतर North-Eastern Region 1240 1214 26 21 16696 16225 471 28
समपणण भारत All India 108665 108196 469 04 1274564 1267209 7355 06
Note The revised data for March 2019 is not avaliable
Excludes energy exported to Bangladesh
राजयState
ऊराण वरवदयत आपरत ण शथिरत ररपोरण (परवाणरवलोकन) Energy Power Supply Position Report (Provisional)
25
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
Energy not Supplied Energy not Supplied
मािण2019 March2019 अपरल2018 -मािण2019 April2018 to March2019
ऊरजा पनत ा म कमी ऊरजा पनत ा म कमी
अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met
कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )
चडीगढ़ Chandigarh 223 223 0 00 369 369 0 00
दिलली Delhi 4016 4016 0 00 7016 7016 0 00
हरियजणज Haryana 6544 6544 0 00 10270 10270 0 00
दहमजचल परिश Himachal Pradesh 1683 1683 0 00 1700 1700 0 00
रमम कशमीि Jammu amp Kashmir 3277 2622 655 200 3277 2622 655 200
परजब Punjab 6564 6564 0 00 12638 12638 0 00
िजरसथजन Rajasthan 11885 11885 0 00 13276 13276 0 00
उतति परिश Uttar Pradesh 16220 16220 0 00 20498 20062 436 21
उततिजखड Uttarakhand 2002 2002 0 00 2216 2216 0 00
उततरी कषतर Northern Region 47925 47356 569 12 63166 61726 1440 23
छततीसगढ़ Chhattisgarh 4444 4128 316 71 4444 4270 174 39
गरिजत Gujarat 16263 16263 0 00 17053 16963 90 05
मधय परिश Madhya Pradesh 12328 12323 5 00 13815 13815 0 00
महजिजषटर Maharashtra 22361 22291 70 03 23864 23254 610 26
िमन औि दिउ Daman amp Diu 336 336 0 01 357 356 1 02
िजिि व नगि हवली Dadra amp Nagar Haveli 800 799 1 01 816 815 1 01
गोवज Goa 538 538 0 00 596 596 0 00
पशचिमी कषतर Western Region 53132 52965 167 03 56675 55821 853 15
आनधर परिश Andhra Pradesh 8977 8977 0 00 9459 9453 6 01
तलगजनज Telangana 10471 10471 0 00 10815 10815 0 00
कनजाटक Karnataka 12841 12841 0 00 12841 12841 0 00
किल Kerala 4264 4228 36 09 4264 4228 36 09
तममल नजड Tamil Nadu 15712 15712 0 00 15712 15712 0 00
पडचिी Puducherry 427 412 15 34 427 412 15 34
लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0
दकषकषणी कषतर Southern Region 49464 49464 0 00 49464 49464 0 00
बबहजि Bihar 4633 4633 0 00 5115 5084 31 06
िजमोिि घजटी ननगम DVC 3035 3035 0 00 3035 3035 0 00
झजिखणड Jharkhand 1210 1210 0 00 1339 1291 48 36
ओडडशज Odisha 4827 4827 0 00 5357 5357 0 00
पशशचम बगजल West Bengal 8287 8287 0 00 9130 9123 7 01
मसशककम Sikkim 100 100 0 00 106 106 0 00
अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7
परवी कषतर Eastern Region 21658 21658 0 00 23141 22733 408 18
अरणजचल परिश Arunachal Pradesh 133 131 2 15 138 138 0 01
असम Assam 1539 1508 31 20 1865 1809 56 30
मणणपि Manipur 204 199 5 25 219 216 3 12
मघजलय Meghalaya 357 357 0 00 374 372 1 04
ममज़ोिम Mizoram 108 105 3 28 121 119 2 17
नजगजलड Nagaland 127 125 2 16 156 138 18 116
बिपिज Tripura 249 249 0 00 298 293 5 17
उततर-परवी कषतर North-Eastern Region 2540 2535 5 02 2967 2850 117 39
समपणण भारत All India 169464 168745 719 04 177022 175528 1494 08
Note The revised data for March 2019 is not avaliable 26
अधिकतम वरवदयत आपरत ण शथिरत ररपोरण (परवाणरवलोकन) Peak Power Supply Position Report (Provisional)
आकड़ मगज वजट नट Figures in MW net
राजयStateमािण2019 March2019 अपरल2018 -मािण2019 April2018 to March2019
मजग की पनत ा म कमी मजग की पनत ा म कमी Demand not MetDemand not Met
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
Excludes the supply to Bangladesh
अपरल 2019 April2019 अपरल2018 -मािण2019 April2019 to April2019
उततरी कषतर Northern Region
चडीगढ़ Chandigarh(Data Not Received)दिलली Delhi
हरियजणज Haryana
दहमजचल परिश Himachal Pradeshरमम कशमीि Jammu amp Kashmir(Data
Not Received)परजब Punjab
िजरसथजन Rajasthanउतति परिश Uttar Pradesh
उततिजखड Uttarakhand
पशचिमी कषतर Western Region
छततीसगढ़ Chhattisgarh
Apr-Nov 2018- No cuts
Maximum Demand cut-58MW
Energy cut- 00020-00032 MUsday
गरिजत Gujarat
मधय परिश Madhya Pradesh
महजिजषटर Maharashtra
गोवज Goa
दकषकषणी कषतर Southern Region
आनधर परिश Andhra Pradesh
तलगजनज Telangana
कनजाटक Karnataka
किल Kerala
तममल नजड Tamil Nadu
पडचिी Puducherryपरवी कषतर Eastern Region
बबहजि Bihar
झजिखणड Jharkhand
ओडडशज Odisha
पशशचम बगजल West Bengal
No N
otifie
d Cu
ts
27
मािण 2019 म इडथरीर पर वरवदयत करौती का वरवरवरण Notified Power CutsRestrictions on Industries during April2019
राजय कषतर State Regionऊराणमाग करौती EnergyDemand Cut
No N
otifie
d Cu
tsNo
Notifie
d Cu
ts
अपरल2019 April 2019 अपरल2019 -अपरल2019 April2019 to April2019
उततरी कषतर Northern Region
चडीगढ़ Chandigarh Data not received Data not received
दिलली Delhi Data not received Data not received
हरियजणज Haryana 0811 hrsday 0811 hrsday
दहमजचल परिश Himachal Pradesh HPSEBL has only 2 agriculture consumers and uninterrupted
power is being supplied to agriculture sector
HPSEBL has only 2 agriculture consumers and uninterrupted
power is being supplied to agriculture sector
रमम कशमीि Jammu amp Kashmir Data not received Data not received
परजब Punjab 379 hrsday 379 hrsday
िजरसथजन Rajasthan 0630 hrsday 0630 hrsday
उतति परिश Uttar Pradesh 2157 hrsday 2157 hrsday
उततिजखड Uttarakhand 2359 hrsday 2359 hrsday
पशचिमी कषतर Western Region
छततीसगढ़ Chhattisgarh 18 hrsday 18 hrsday
गरिजत Gujarat 8 hrsday 8 hrsday
मधय परिश Madhya Pradesh Three-Phase Supply(Irrigation)- 0953 hrs day Three-Phase
(Mixed) Supply - 2334 hrs day
Three-Phase Supply(Irrigation)- 0953 hrs day Three-Phase
(Mixed) Supply - 2334 hrs day
महजिजषटर Maharashtra Three-Phase Supply(Irrigation)- 9 hrs day Three-Phase Supply(Irrigation)- 9 hrs day
गोवज Goa No restriction No restriction
दकषकषणी कषतर Southern Region
आनधर परिश Andhra Pradesh 07 hrsday 07 hrsday
तलगजनज Telangana 24 hrsday 24 hrsday
कनजाटक Karnataka 6 hrsday 6 hrsday
किल Kerala No Restrictions No Restrictions
तममल नजड Tamil Nadu 9 hrsday (6 hrs during day time and 3 hrs during night time) 9 hrsday (6 hrs during day time and 3 hrs during night time)
पडचिी Puducherry No Restrictions No Restrictions
परवी कषतर Eastern Region
बबहजि Bihar 18 hrsday 18 hrsday
झजिखणड Jharkhand 20 hrsday 20 hrsday
ओडडशज Odisha 24 hrsday 24 hrsday
पशशचम बगजल West Bengal 23 hrsday 23 hrsday
28
मारच 2019 कषि कषतर को षिदयत आपरतच का षििरण Power Supply to Agricultural Sector during March2019
राजय कषतर State Regionऔसत वरवदयत आपरत ण घनरो म Average Hours of Supply
On segregated feeders
SNo Contents Page
1 Growth of Installed Capacity since 6th Plan 29
2 Progress of Transmission Sector since 6th Plan 30
3 All India Yearly Coal consumption for Power Generation (Utilities)
4 All India Annual Per Capita Consumption of Electricity since -2006
5 Average cost of power supply amp Average realisation (Paisakwh)
6 Growth of Rural Electrification amp Pump Sets Energisation
7 Status of Hydro Schemes Cleared by the CEA in Apr-2019
Section G - Growth of Power Sector
31
32
(In MW)
Coal Gas Diesel Total
End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472
End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634
End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537
End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596
End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921
End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703
End of 12th Plan 19216288 2532938 83763 21832988 6780 4447842 50018 31960630
Up to Apr-2019 20070450 2493722 63763 22627934 678000 4539922 7764163 35610019
Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-17) = 51529 MW
Electricity Generation (MU) Targets and Achievements for 2016-17
Coal Gas Diesel Nuclear Hydro Res Total
2007045 2493722 637629 678000 453992 77641625 22925174
29
1 Growth of Installed Capacity Since 6th Plan
Plan YearThermal
Nuclear Hydro RES (MNRE) Total
2007045
2493722637629
678000
4539922
77641625
Total Installed Capacity 35610019 MW
Coal Gas Diesel Nuclear Hydro Res
Progress of Transmission Sector in the Country up to April 2019
1 TRANSMISSION LINES (All fig in CKM)
At the end of
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
6th plan 0 0 0 0 0 0 0 0 0 0 0 0 1831 4198 0 6029 1641 44364 0 46005 3472 48562 0 52034
7th plan 0 0 0 0 0 0 0 0 0 0 0 0 13068 6756 0 19824 4560 55071 0 59631 17628 61827 0 79455
8th plan 0 0 0 0 1634 0 0 1634 0 0 0 0 23001 13141 0 36142 6564 73036 0 79600 31199 86177 0 117376
9th plan 0 0 0 0 3234 1504 0 4738 751 409 0 1160 29345 20033 0 49378 8687 88306 0 96993 42017 110252 0 152269
10th plan 0 0 0 0 4368 1504 0 5872 1775 409 0 2184 48708 24730 0 73438 9444 105185 0 114629 64295 131828 0 196123
11th Plan 0 0 0 0 5948 1504 1980 9432 4839 411 0 5250 71023 30191 5605 106819 10140 125010 830 135980 91950 157116 8415 257481
12th Plan 6124 0 0 6124 5948 1504 1980 9432 25465 1177 4598 31240 92482 48240 17065 157787 11014 151276 978 163268 141033 202197 24621 367851
13th Plan (Up
to Mar2019)6124 0 0 6124 5948 1504 1980 9432 33692 1512 6605 41809 101335 58238 21173 180746 11734 162552 1010 175296 158833 223806 30768 413407
13th Plan (Up
to Apr-19)6124 0 0 6124 5948 1504 1980 9432 33745 1512 6605 41862 101335 58258 21173 180766 11734 162953 1010 175697 158886 224227 30768 413881
27150 600 MW of 132 kV Inter-Regional power transmission capacity links which are operated radially from time to time is not added in the total
75050
47900
24000
99050
30
Grand Total
Note - The figure upto the end of 10th plan in for stringing progress including the lines not commissioned Now only commissioned lines are reckoned Accordingly the figure for 10th plan (end) may read
as 187555 after adjusting with (-) 10852 Ckm
Inter-regional Power Transfer Capacity (MW)
plusmn 800 kV HVDC plusmn 500 kV HVDC 765 kV 400 kV 220 kV
IR addition in 12th
Plan (up to March
2017)
Inter-regional
Transmission
Capacity at the end
of Plan Period 2017-
22 (as on April19)
IR at the end of 11th
PlanIR at the end of 12th
Plan
IR Capacity Addition
at the end of Plan
Period 2017-22 (Till
April 19)
2004-05 27800
2005-06 28100
2006-07 30200
2007-08 33000
2008-09 35500
2009-10 36700
2010-11 38700
2011-12 41756
2012-13 45460
2013-14 48940
2014-15 53040
2015-16 54590
2016-17 57430
2017-18 60800
2018-19 62890
Year
2005-06
2006-07
2007-08
2008-09
2009-10
2010-11
2011-12
2012-13
2013-14
2014-15
2015-16
2016-17
2017-18
2018-19
2004-05 254 209 7568
2005-06 260 221 7636
2006-07 276 227 7423
2007-08 293 239 7727
2008-09 340 263 8713
2009-10 355 268 8870
2010-11 398 303 11975
2011-12 455 330 13514
2012-13 501 376 14867
2013-14 518 175
2014-15 520
Source- PFC Reports on the performance of State Power Utilities 31
1181
7335
7786
91441
8188
88363
957
1010
1075
1122
1149
(GrossGen+ Net Import) Mid-year population Provisional
5 Average cost of power supply amp average realization ( paiseKWH )
Yearcost of supply
(paiseunit)
Realization(paiseunit)
Including AgricultureOnly
Agriculture
6719
7171
3 All India yearly Coal Consumption for Power Generation (Utilities)
YEARCoal Consumption
Million Tonnes
4 All India Annual per Capita consumption of Electricity Since 2006
Per Capita Consumption ( kWh)
6314
Sl
NoExecuting Agency
Installed
Capacity (MW)Cost (Rs crore)
Date of
Clearance
32
Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as
Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received
from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made
available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified
villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is
independent of the earlier published reports
No Hydro Electric Project has been issued concurrenceAppraisal letter by CEA during April 2019
7 Status of Hydro Schemes Cleared by the CEA in Apr-2019
Name of Scheme
1999-002000-01
297594
010408 to 310309010409 to 310310
10th Plan
2005-062006-07
322968331020
6 Growth Of Rural Electrification amp Pumpsets Energisation
Plan Year
9th Plan2002-03
134092626
4111
Pump Sets Energised Villages Electricfied (Nos)
2001-02
284064367244
1218
27801997-981998-99
3207
482864
12632
1576036
4451722594
15455554
2314176
397343611750
2093311060316074
65109527813884
46708
18423975
499150
2003-042004-05
5743
9769
Cumu upto End of 10th Plan
010407 to 310308
010410 to 310311557976840909
010411 to 310312
412667
86293726
No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification
since 2004-05
65291374575 296361511th Plan
Cumu upto End of 11th Plan
596556 21212860
557439Cummulative up to end of 12th Plan
SN Contents Page
1 Rate of sale of power for the year 2016-17 33-41
RATE OF SALE OF POWER FOR THE YEAR 2016-17
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) NORTHERN REGION
CENTRAL SECTOR
BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 18000 66900 19800
CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 54000 222400 21600
CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 30000 144400 19600
CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 23100 91700 42600
PARBATI - III HPS NHPC LTD HYDRO-HYDRO 52000 68200 54800
DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 28000 95600 30000
CHUTAK NHPC LTD HYDRO-HYDRO 4400 22000 79800
DULHASTI HPS NHPC LTD HYDRO-HYDRO 39000 228000 56400
SALAL HPS NHPC LTD HYDRO-HYDRO 69000 342300 11000
TANAKPUR HPS NHPC LTD HYDRO-HYDRO 9420 43000 29600
URI HPS -I NHPC LTD HYDRO-HYDRO 48000 280300 16000
URI HPS - II NHPC LTD HYDRO-HYDRO 24000 147300 48600
NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 4500 24600 88200
SEWA - II NHPC LTD HYDRO-HYDRO 12000 47100 43400
ANTA CCPP NTPC LTD THERMAL-GASN 41930 67539 32400
AURAIYA CCPP NTPC LTD THERMAL-GASN 66336 53501 39100
BADARPUR TPS NTPC LTD THERMAL-COAL 70500 159153 44800
DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 84000 296170 42300
DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 98000 526686 46300
DADRI CCPP NTPC LTD THERMAL-GASHSD 82978 227469 33000
FARIDABAD CCPP NTPC LTD THERMAL-GASN 43159 115577 30800
RIHAND STPS I NTPC LTD THERMAL-COAL 100000 596766 24500
RIHAND STPS II NTPC LTD THERMAL-COAL 100000 737069 24600
RIHAND STPS III NTPC LTD THERMAL-COAL 100000 706546 30600
SINGRAULI STPS NTPC LTD THERMAL-COAL 200000 1394068 20400
TANDA TPS NTPC LTD THERMAL-COAL 44000 295438 40800
UNCHAHAR TPS I NTPC LTD THERMAL-COAL 42000 256454 39800
UNCHAHAR TPS II NTPC LTD THERMAL-COAL 42000 273577 38900
UNCHAHAR TPS III NTPC LTD THERMAL-COAL 21000 142780 43000
KOLDAM NTPC LTD HYDRO-HYDRO 80000 363260 43600
NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 303575 25841
RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 108000 668677 35374
NJHPS SJVNL HYDRO-HYDRO 150000 699496 23820
RAMPUR HPS SJVNL HYDRO-HYDRO 41202 195982 32260
TEHRI HPP THDC HYDRO-HYDRO 100000 272543 51800
KOTESHWAR HEP THDC HYDRO-HYDRO 40000 106244 53400
IGSTPS JHAJJAR ARAVALI P CPL THERMAL-COAL 150000 510429 49490
NEYVELI BARSINGSAR NEYVELI LIG CORP LTD THERMAL-LIG 25000 127520 38040
STATE SECTOR
PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 21000 14222 48200
PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 21000 19205 48400
PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 25000 102257 42600
PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 25000 62107 41800
DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 60000 312213 41000
RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 120000 35767442200
WYC HYDEL STATION HPGCL HYDRO-HYDRO 6240 20365 24900
GIRI POWER HOUSE HPSEB HYDRO-HYDRO 6000 13958 7600
ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 1695 5467 11900
BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 12000 18528 6700
GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 2250 7462 22500
BASSI POWER HOUSE HPSEB HYDRO-HYDRO 6600 29649 7500
BINWA POWER HOUSE HPSEB HYDRO-HYDRO 600 2749 19300
ANNEXURE-I
RATE OF SALE OF POWER FOR THE YEAR 2016-2017
Page 33
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) GAJ POWER HOUSE HPSEB HYDRO-HYDRO 1050 2914 26700
BANER POWER HOUSE HPSEB HYDRO-HYDRO 1200 2864 16200
HOLI POWER HOUSE HPSEB HYDRO-HYDRO 300 616 22500
THIROT POWER HOUSE HPSEB HYDRO-HYDRO 450 1126 22500
KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 1200 3064 22500
LARJI POWER HOUSE HPSEB HYDRO-HYDRO 12600 53677 23700
NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 250 750 31000
CHABA POWER HOUSE HPSEB HYDRO-HYDRO 175 465 23300
RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 150 101 13400
SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 200 000 22500
KILLAR HPSEB HYDRO-HYDRO 030 050 22500
BHABA AUGUMENP H HPSEB HYDRO-HYDRO 450 1276 22500
BS CHAMBA HPSEB HYDRO-HYDRO 045 099 19500
GUMMA HPSEB HYDRO-HYDRO 300 423 22500
GAS TURBINE POWER STATION IPGCL THERMAL-GAS 27000 67233 39300
PPS-I PPCL THERMAL-GAS 33000 175905 38300
PPS-III PPCL THERMAL-GAS 137120 196879 36100
LOWER JHELUM JampKPDD HYDRO-HYDRO 10500 60214 5100
UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 2260 10514 6300
UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 10500 44202 8500
GANDHARBAL JampKPDD HYDRO-HYDRO 1500 8925 4700
KARNAH MPH JampKPDD HYDRO-HYDRO 200 1122 31000
CHENANI I JampKPDD HYDRO-HYDRO 2330 10892 6600
CHENANI II JampKPDD HYDRO-HYDRO 200 1188 9300
CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 750 3634 14200
IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 375 2108 18500
IGO MERCHELLONG JampKPDD HYDRO-HYDRO 300 1572 29700
PAHALGAM MHP JampKPDD HYDRO-HYDRO 450 1713 32900
MARPACHOO JampKPDD HYDRO-HYDRO 075 375 29800
HAFTAL JampKPDD HYDRO-HYDRO 100 483 28700
SANJAK JampKPDD HYDRO-HYDRO 126 441 36000
SEWA-III JampKPDD HYDRO-HYDRO 900 3273 20200
BHADERWAH JampKPDD HYDRO-HYDRO 150 935 8900
BAZGO JampKPDD HYDRO-HYDRO 030 108 33300
SUMOOR JampKPDD HYDRO-HYDRO 010 045 35400
HUNDER JampKPDD HYDRO-HYDRO 040 176 26200
STAKNA JampKPDD HYDRO-HYDRO 400 1933 4100
KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 124000 662879 31360
SURATGARH TPS RRVUNL THERMAL-COAL 150000 402328 41730
CHHABRA TPS 1amp 2 RRVUNL THERMAL-COAL 50000 305946 36700
CHHABRA TPS 3 RRVUNL THERMAL-COAL 25000 151536 36700
CHHABRA TPS 4 RRVUNL THERMAL-COAL 25000 155896 36700
RAMGARH GT POWER PROJECT RRVUNL THERMAL-COAL 22050 43177 41800
RAMGARH GAS T P PROJECT 3 RRVUNL THERMAL-GAS 5000 93615 41800
DHOLPUR C C POWER PROJECT RRVUNL THERMAL-R-LNG 33000 9486 46110
MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 14000 20855 34192
MINI MICRO HYDEL (MMH) P S RRVUNL HYDRO-HYDRO 2385 851 37800
KALISINDH TPP 1 RRVUNL THERMAL-COAL 60000 341543 45000
KALISINDH TPP 2 RRVUNL THERMAL-COAL 60000 211588 45000
KHARA HEP UPJVNL HYDRO-HYDRO 7200 26654 7200
MATATILLA HEP UPJVNL HYDRO-HYDRO 3060 12219 6500
OBRA HEP UPJVNL HYDRO-HYDRO 9900 21517 6300
RIHAND UPJVNL HYDRO-HYDRO 30000 57369 5500
ANPARA A TPS UPRVUNL THERMAL-COAL 63000 317536 27000
ANPARA B TPS UPRVUNL THERMAL-COAL 100000 705605 22700
ANPARA D UPRVUNL THERMAL-COAL 100000 300158 39800
HARDUAGANJ TPS UPRVUNL THERMAL-COAL 16500 45817 49200
HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 50000 304389 46600
OBRA A TPS UPRVUNL THERMAL-COAL 28800 13158 34000
OBRA B TPS UPRVUNL THERMAL-COAL 100000 328124 21900
Page 34
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) PANKI TPS UPRVUNL THERMAL-COAL 21000 66488 50300
PARICHHA TPS UPRVUNL THERMAL-COAL 22000 38762 49400
PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 42000 231931 45600
PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 50000 276722 50400
CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 24000 70845 8290
CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 14400 75366 8390
DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 3375 9595 12080
DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 5100 18701 10520
KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4140 17359 12330
KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 12000 33001 9420
KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 3000 11953 8320
TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 9000 33983 12460
MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 30400 124510 16110
RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 19800 17897 10550
MPUR UTTARAKHAND JVNL HYDRO-HYDRO 930 5121 19200
PATHRI UTTARAKHAND JVNL HYDRO-HYDRO 2040 11636 14200
GALOGI UTTARAKHAND JVNL HYDRO-HYDRO 300 648 12500
PRIVATE SECTOR
MGTPP CLP INDIA PVT LTD THERMAL-COAL 132000 268902 41940
SHRINAGAR HEP ALAKNANDA HPCL HYDRO-HYDRO 33000 127414 48800
GAMA INFRAPROP CCPP GAMA INFRAPROP PVT THERMAL-GAS 22500 52686 47000
PPGCL (BARA) JP POWER VENTURES LTD THERMAL-COAL 198000 448200 38500
MALANA HEP MALANA PCL HYDRO-HYDRO 8600 26354 29792
MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 10000 30369 32580
ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 19200 56347 36079
KASHANG HEP H P PCL HYDRO-HYDRO 19500 5034 29200
BASPA-II HEP HBPCL HYDRO-HYDRO 30000 132769 13600
KARCHAM WANGTOO HEP HBPCL HYDRO-HYDRO 100000 434386 36600
RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 108000 582600 43700
RITHALA COMBI CY POWER PLANT TATA POWER DDL THERMAL-GAS 9480 000 11900
RAJPURA TPS NABHA POWER LTD THERMAL-GAS 140000 901484 39000
TALWANDI SABO POWER LTD TALWANDI SABO POWER LTD THERMAL-COAL 198000 636040 49548
ROJA THERMAL POWER STATION ROJA POWER SCL THERMAL-COAL 120000 727200 43400
KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 34400 63400
BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 36000 62600
MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 38200 60800
UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 37900 61500
KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 42300 58800
LALITPUR PGCL BAJAJ ENERGY PVT LTD THERMAL-COAL 198000 359400 47300
PRAYAGRAJ PGCL PRAYAGRAJ PGCL THERMAL-COAL 132000 448200 38595
KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 132000 783182 33438
WESTERN REGION
CENTRAL SECTOR
INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 100000 325333 23892
OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 52000 141663 34001
GANDHAR CCPP NTPC LTD THERMAL-GAS 65739 221924 28700
KAWAS CCPP NTPC LTD THERMAL-GASN 65620 167929 27000
KORBA I amp II NTPC LTD THERMAL-COAL 210000 1499171 20500
KORBA III NTPC LTD THERMAL-COAL 50000 358746 26600
SIPAT STPS I NTPC LTD THERMAL-COAL 198000 1479902 26800
SIPAT STPS II NTPC LTD THERMAL-COAL 100000 766549 26500
VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 126000 693142 25800
VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 100000 608781 23800
VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 100000 673475 27600
VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 100000 655924 32900
VINDHYACHAL STPS V NTPC LTD THERMAL-COAL 50000 328265 31700
MOUDA I NTPC LTD THERMAL-COAL 100000 343130 44500
MOUDA Ii NTPC LTD THERMAL-COAL 66000 40637 39900
RATNAGIRI GAS amp POWER PVT LTD RGPPL THERMAL-GAS 196708 442485 47000
KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 000 24729
TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 32000 201227 10740
Page 35
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 365122 19069
TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 787444 29324
STATE SECTOR
GSEG-HAZIRA15610 MW GUJARAT S ENEGEN LTD THERMAL-GAS 15610 1805 28200
GSEG-HAZIRA35143 MW GUJARAT S ENEGEN LTD THERMAL-GAS 35130 22276 51300
GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 21978 51800
AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 13929 26100
KORBA TPS EAST CSPGCL THERMAL-COAL 44000 198673 33880
DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 365808 27570
KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 316500 30420
HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 532878 19410
CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 515 58300
MTTPS CHAMPA U-I CSPGCL THERMAL-COAL 50000 220376 39000
MTTPS CHAMPA U-II CSPGCL THERMAL-COAL 50000 23709 10000
SHP GANGREL CSPGCL HYDRO-HYDRO 1000 2350 36790
BANGO HEP CSPGCL HYDRO-HYDRO 12000 14662 8900
MHP KORBA WEST CSPGCL HYDRO-HYDRO 170 859 38190
SIKASAR HEP CSPGCL HYDRO-HYDRO 700 418 26870
DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8843 74500
DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 19446 51500
GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 66388 71600
GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127488 41300
KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 96072 43900
KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 29841 56400
SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 184966 58800
UKAI 1-5 GSECL THERMAL-COAL 85000 204891 46900
UKAI TPS 6 GSECL THERMAL-COAL 50000 284448 48200
WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 271999 58300
WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 82808 44100
KADANA HPS GSECL HYDRO-HYDRO 24200 34433 16800
UKAI HPS GSECL HYDRO-HYDRO 30500 40585 6100
TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 123000 11500
BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 8900 10900
BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 7200 27500
JHINNA HPS MPPGCL HYDRO-HYDRO 2000 9700 18500
RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 44300 3400
GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 17300 4600
SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 4100 16900
MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 14600 27000
PENCH HPS MPPGCL HYDRO-HYDRO 16000 23700 8100
RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 3000 16900
AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 134400 35100
SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 283800 38700
SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 344600 34300
SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 111600 61600
SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 211800 58000
SSTPS PH-I MPPGCL THERMAL-COAL 120000 233100 84300
BHUSAWAL TPS MSPGCL THERMAL-COAL 142000 566258 51100
CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1365682 33700
KHAPERKHEDA MSPGCL THERMAL-COAL 134000 706207 39100
KORADI TPS MSPGCL THERMAL-COAL 62000 443206 42000
NASIK TPS MSPGCL THERMAL-COAL 63000 297275 47000
PARLI TPS MSPGCL THERMAL-COAL 113000 175934 71600
PARAS MSPGCL THERMAL-COAL 50000 267931 38700
URAN CCPP MSPGCL THERMAL-GAS 67200 320330 30600
KOYANA MSPGCL HYDRO-HYDRO 195600 328155 13100
SMALL HYDRO POWER PLANTS MSPGCL HYDRO-HYDRO 45400 93062 30500
BHIRA MSPGCL HYDRO-HYDRO 8000 10046 8400
TILLARI MSPGCL HYDRO-HYDRO 8900 10584 3100
SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 233298 20500
SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 87633 20500
PRIVATE SECTOR
Page 36
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 81282 46750
JNSTPP(JAYPEE NIGRIE) JP POWER VENTURES LTD THERMAL-COAL 132000 726695 29310
MB POWER MB POWER THERMAL-COAL 120000 345632 38310
ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 754922 28671
ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 780761 23495
ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 198000 1263784 32090
ADANI POWER MAHARA ADANI POWER LTD THERMAL-COAL 330000 1666191 34124
AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 170065 36827
SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 252035 45129
ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 458551 36000
ESSAR POWER MP LTD ESSAR POWER MP LTD THERMAL-COAL 60000 243040 28600
VEDANTA LTD (P P -I) VEDANTA LTD THERMAL-GAS 3000 15044 24000
VEDANTA LTD (P P -II) VEDANTA LTD THERMAL-GAS 3000 21293 24000
PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 8234600 24000
165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 5850 64390
145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 68717 40349
SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 132655 28776
SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 144686 38567
MUNDRA UMPPCOASTAL GUJARAT POWER
LTD THERMAL-IMP COAL 400000 2530300
23900
LANCO AMARKANTAK TPP PATHADIH
U-ILANCO AMARKAN POWER LTD THERMAL-COAL 30000 195500
29200
LANCO AMARKANTAK TPP PATHADIH
U-IILANCO AMARKAN POWER LTD THERMAL-COAL 30000 206900
27600
BARADARHA TPS D B POWER LTD THERMAL-COAL 120000 677373 29200
JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 405000 28900
JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 453000 40500
DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 339437 40700
TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 293400 44000
TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 137200 37000
TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 174900 44000
BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 92900 14100
BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23700 34300
KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 27600 48300
CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2530300 23900
BHANDARDRA HEP -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 2475 54900
SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 161400 26500
SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 445000 39000
SOTHERN REGION
CENTRAL SECTOR
NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 325699 54820
NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 305532 39880
NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 998805 38510
NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 113016 54070
NEYVELI TAMILNADU POWER LTD JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 625274 42200
VALLUR TPS NTPC TECL THERMAL-COAL 150000 856438 42350
R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 1493 84300
RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1502919 29400
RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 341291 31800
SIMHADRI I NTPC LTD THERMAL-COAL 100000 688382 36800
SIMHADRI II NTPC LTD THERMAL-COAL 100000 663657 43400
KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 593110 31324
MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 291625 21764
KKNPP-1 amp 2 NPCIL NUCLEAR-NUCLEAR 200000 572609 40948
MINICOY LAKSHADEEP THERMAL-DIESEL 340 770 29600
KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1097 29600
AMINI LAKSHADEEP THERMAL-DIESEL 265 509 29600
ANDROTT LAKSHADEEP THERMAL-DIESEL 219 524 29600
KALPENI LAKSHADEEP THERMAL-DIESEL 175 356 29600
AGATTI LAKSHADEEP THERMAL-DIESEL 195 658 29600
KADMAT LAKSHADEEP THERMAL-DIESEL 190 414 29600
KILTAN LAKSHADEEP THERMAL-DIESEL 150 269 29600
CHETLET LAKSHADEEP THERMAL-DIESEL 100 139 29600
BITRA LAKSHADEEP THERMAL-DIESEL 043 024 29600
BANGARAM LAKSHADEEP THERMAL-DIESEL 018 009 29600
Page 37
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) STATE SECTOR
Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 721811 46500
Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 50000 336142 46500
RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 237358 46500
RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 239926 46500
RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 124500 46500
SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 62109 46500
UPPER SILERU APGENCO HYDRO-HYDRO 24000 33000 46500
LOWER SILERU APGENCO HYDRO-HYDRO 46000 81066 46500
DONKARAI APGENCO HYDRO-HYDRO 2500 6007 46500
PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 1262 46500
CHETTIPETA APGENCO HYDRO-HYDRO 100 214 46500
MUCHKUND APGENCO HYDRO-HYDRO 12000 37571 46500
NAGARJUNASAGAR RCPH APGENCO HYDRO-HYDRO 9000 606 46500
TUNGABHADRA HES amp HAMPI(AP
Share)
APGENCO HYDRO-HYDRO 7200 6100 46500
KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 352232 42600
KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 288131 32500
KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 319272 46500
RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 40073 44300
KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 308317 46000
KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 308963 51300
SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 61004 76600
NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 17960 75300
PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 20873 58300
POCHAMPAD-I TSPGENCO HYDRO-HYDRO 2700 5455 29800
POCHAMPAD-II TSPGENCO HYDRO-HYDRO 900 1932 40700
NIZAMSAGAR TSPGENCO HYDRO-HYDRO 1000 1126 53400
RAICHUR TPS 1 to 7 KPCL THERMAL-COAL 147000 890866 43800
RAICHUR TPS 8 KPCL THERMAL-COAL 25000 159523 48200
BELLARI TPS 1 KPCL THERMAL-COAL 50000 318679 51100
BELLARI TPS 2 KPCL THERMAL-COAL 50000 232347 55600
BELLARI TPS 3 KPCL THERMAL-COAL 70000 47565 34400
BHADRA PH KPCL HYDRO-HYDRO 3920 2369 45900
GERUSUPPA PH KPCL HYDRO-HYDRO 24000 26990 22000
GHAT PRABHA HEP KPCL HYDRO-HYDRO 3200 4777 25300
KADRA HPS KPCL HYDRO-HYDRO 15000 16889 26800
NAGJHARI KPCL HYDRO-HYDRO 90000 155159 9800
KODASALLI DPH KPCL HYDRO-HYDRO 12000 14854 19200
MUNIRA+MGH+SPH+SPH KPCL HYDRO-HYDRO 22640 48211 7900
SHARAVATHY HPS KPCL HYDRO-HYDRO 108550 276215 5400
ALMATTI DPH KPCL HYDRO-HYDRO 29000 39611 24600
VARAHI UGPH KPCL HYDRO-HYDRO 46000 71368 15600
IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 17196 15300
IDUKKI HPS KSEB HYDRO-HYDRO 78000 137905 15300
KAKKAD HPS KSEB HYDRO-HYDRO 5000 13063 15300
KALLADA HPS KSEB HYDRO-HYDRO 1500 4436 15300
KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 46544 15300
KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 635 15300
LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 30822 15300
MALANKARA HPS KSEB HYDRO-HYDRO 1050 2474 15300
MATTUPETTY KSEB HYDRO-HYDRO 200 230 15300
MALAMPUZHA KSEB HYDRO-HYDRO 250 063 15300
CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 864 15300
URUMI ST I amp II KSEB HYDRO-HYDRO 615 903 15300
LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 248 15300
NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7765 19625 15300
PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 16601 15300
PANNIAR HPS KSEB HYDRO-HYDRO 3240 6217 15300
PORINGALKUTHU KSEB HYDRO-HYDRO 3600 10052 15300
PORINGALKUTHU LBE KSEB HYDRO-HYDRO 1600 9438 15300
PEPPARA KSEB HYDRO-HYDRO 300 395 15300
POOZHITHODE KSEB HYDRO-HYDRO 480 1045 15300
Page 38
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) PEECHI KSEB HYDRO-HYDRO 125 040 15300
RANI-PERUNADU KSEB HYDRO-HYDRO 400 585 15300
SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 79783 15300
SENGULAM HPS KSEB HYDRO-HYDRO 5120 11558 15300
SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 16711 15300
VILANGAD KSEB HYDRO-HYDRO 750 1578 15300
BARAPOLE KSEB HYDRO-HYDRO 1500 1932 15300
VELLATHOOVAL KSEB HYDRO-HYDRO 360 305 15300
CHIM0NY KSEB HYDRO-HYDRO 250 156 15300
ADYANPARA KSEB HYDRO-HYDRO 350 501 15300
BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 554 15300
KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 3801 15300
KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 23132 32800
ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 14416 62280
METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 523970 62280
METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 321270 62280
NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 336575 62280
NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 591240 62280
TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 508966 62280
KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 30897 62280
VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 18720 90699 62280
KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 33593 62280
BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 1047 62280
PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 1250 62280
PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 330 62280
MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 4897 62280
MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 032 62280
KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15681 62280
KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 40608 62280
KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 21342 62280
KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 4717 62280
KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4322 62280
KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2399 62280
METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 4416 62280
METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 8035 62280
BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2187 62280
BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2359 62280
BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2511 62280
BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 1949 62280
BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 1819 62280
POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 172 62280
SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 241 62280
MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 026 62280
THIRUMOORTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 136 62280
PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 9309 62280
VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 353 62280
SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 4192 62280
PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 6571 62280
SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 1186 62280
SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6319 62280
ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 6122 62280
KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 28674 62280
SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 18381 62280
SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 4258 62280
KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 12680 62280
KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4201 62280
ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 000 62280
PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 19175 62280
AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 078 62280
BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 504 62280
BHAVANI KATTALAI (BKB)(IIIampIII BB I amp II)TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 5847 62280
PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 000 62280
Page 39
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) SRI DAMODARAM STPS APPDCL THERMAL-COAL 160000 808108 36300
PRIVATE SECTOR
KARUPPUR TANJORE LANCO TANJORE PCL THERMAL-GAS 12000 48096 28770
SIMHAPURI ENERGY LTD SIMHAPURI ENERGY LTD THERMAL-COAL 60000 143900 39100
JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 7111 45500
SBU 1 JSW ENERGY LTD
VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 26000 159100
43300
SBU 2 JSW ENERGY LTD
VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 60000 247900
42800
LANCO KPLLANCO KONDAPALLI POWER
LTDTHERMAL-GAS 36814 85060
25776
LANCO KPL STG -IILANCO KONDAPALLI POWER
LTDTHERMAL-GAS 36600 12979
46330
LANCO KPL STG -IIIALANCO KONDAPALLI POWER
LTDTHERMAL-GAS 37100 85710
46330
LANCO KPL STG -III BLANCO KONDAPALLI POWER
LTDTHERMAL-GAS 37100 43639
46330
HINDUJA NATIONAL PCL HINDUJA NATIONAL PCL THERMAL-COAL 104000 303000 38200
MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 121164 49940
UDUPI POWER COR LTD ADANI POWER LTD THERMAL-COAL 120000 754613 42500
SPECTRUM POWER GENERATION
LTD SPECTRUM PG LTD THERMAL-GASN 20525 9256812
34952
TAQA NEYVELI POWER COM PVT
LTD TAQA NEYVELI THERMAL-LIG 25000 5840
34500
ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 251000 51000
ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 207860 36800
GMR VEMAGIRI POWER GENERATION
LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 30117
46450
EASTERN REGION
CENTRAL SECTOR
MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 64675 53113
MTPS STAGE - II KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 39000 1432 69138
BOKARO `B` TPS DVC THERMAL-COAL 63000 145670 31539
MEJIA TPS U 1-3 DVC THERMAL-COAL 63000 348298 31552
MEJIA TPS U 4 DVC THERMAL-COAL 21000 116099 34997
MEJIA TPS U 5-6 DVC THERMAL-COAL 50000 276427 35976
MEJIA TPS U 7-8 DVC THERMAL-COAL 100000 552854 36991
DURGAPUR STEEL TPS DVC THERMAL-COAL 100000 665550 39323
DURGAPUR TPS DVC THERMAL-COAL 21000 59270 35416
RAGHUNATHPUR TPS DVC THERMAL-COAL 120000 201650 35326
MAITHON HYDEL STA DVC HYDRO-HYDRO 6320 12200 17984
CHANDRAPURA TPSU1-3 DVC THERMAL-COAL 42000 257610 35095
CHANDRAPURA TPSU7-8 DVC THERMAL-COAL 50000 306673 34987
KODERMA TPS DVC THERMAL-COAL 100000 380180 38131
PANCHET HPS DVC HYDRO-HYDRO 8000 13360 17984
TILLAYA HPS DVC HYDRO-HYDRO 400 1410 17984
RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34700 35400
TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 277300 23200
TLDP -III NHPC LTD HYDRO-HYDRO 13200 55400 62000
TLDP -IV NHPC LTD HYDRO-HYDRO 16000 60300 25600
FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 957219 33700
FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 308943 41000
BONGAINGAON TPS NTPC LTD THERMAL-COAL 25000 153663 58600
KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 542277 34200
KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 942591 34200
BARH-II NTPC LTD THERMAL-COAL 132000 728021 44500
TALCHER TPS NTPC LTD THERMAL-COAL 46000 335521 30100
TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 702319 25600
TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1436521 24700
STATE SECTOR
BTPS(RampM) BIHAR STATE PGCL THERMAL-COAL 22000 12142 39700
BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 98331 10602
HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 50593 9482
CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 19689 2605
RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 53192 6033
UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 147208 14637
Page 40
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 60353 4519
IB TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 288567 25000
J P H GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 210 038 61100
MEYONG CHU GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 400 1086 61100
TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 122667 38200
DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 214339 43321
KOLAGHAT THERMAL POWER
STATION
WEST BENGAL PDCL THERMAL-COAL 126000 538269 31603
BAKRESHWAR THERMAL POWER
PLANT
WEST BENGAL PDCL THERMAL-COAL 105000 634876 32154
BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 45000 166855 33299
SANTHALDIH THERMAL POWER
STATION
WEST BENGAL PDCL THERMAL-COAL 50000 336442 34932
SAGARDIGHI THERMAL POWER
PROJECT
WEST BENGAL PDCL THERMAL-COAL 160000 423121 34705
JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 20344 68900
RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 24559 68900
TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 4623 68900
PURULIA PUMPED STORAGE
PROJECT
WEST BENGAL SEDCL HYDRO-HYDRO 90000 108816 68900
MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2768 68900
PRIVATE SECTOR
CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 49474 20230
CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 555500 70200
HALDIA ENERGY HALDIA ENERGY LTD THERMAL-COAL 60000 371000 50400
DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3688 63400
KAMALANGA TPS GMR KAMALANGA ENERGY LTD THERMAL-COAL 105000547670
33300
ADHUNIK POWER U-1 ADHUNIK POWER THERMAL-COAL 27000 158 44060
ADHUNIK POWER U-2 ADHUNIK POWER THERMAL-COAL 27000 168 44250
VL-JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 332800 23622
JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 43000 45250
JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 71700 37030
JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 70700 35920
JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 71100 38870
JOJOBERA UNIT 5 TATA POWER COM LTD THERMAL-COAL 12000 79300 44560
JOJOBERA UNIT 6 TATA POWER COM LTD THERMAL-WHR 12000 83700 12840
IEL KALINGANAGAR U-I TATA POWER COM LTD THERMAL-WG 6750 33400 22500
IEL KALINGANAGAR U-II TATA POWER COM LTD THERMAL-WG 6750 34800 22500
MAITHON UNIT 1 amp 2 TATA POWER COM LTD THERMAL-COAL 105000 678000 36100
HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 27500 24340
HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 28400 24340
HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 15800 24310
NORTH EASTERN REGION
CENTRAL SECTOR
LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 74100 36600
AGARTALA GT NEEPCO THERMAL-GAS 13500 88611 27210
ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 153111 32310
DOYANG HEP NEEPCO HYDRO-HYDRO 7500 25598 49801
KOPILI HEP NEEPCO HYDRO-HYDRO 20000 98186 11491
KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 19582 20237
KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 10310 17968
RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 124093 22945
TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 10100 17344 39000
STATE SECTOR
HYDRO POWER (122 Stns) ITANAGAR GOVT OF ARUNACHAL
PRADESHHYDRO-HYDRO 6971 6217270
24600
KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39514 17337
LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 82327 36810
NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 33318 48290
MYNTRIANG SHEP ST II ASSAM POWER GENCO HYDRO-HYDRO 300 567 35776
LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 9130 49200
LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 012 49200
DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 022 49200
TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 000 49200
UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 4990 16000
UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 6476 37000
UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 16494 14600
UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 3600 9556 15000
SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 758 8000
MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44070 44800
KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 154 41400
TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 091 41400
MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 411 41400
MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 394 41400
KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 760 41400
SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 3264 41400
LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 044 41400
BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 18953 28000
ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 43585 28200
GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 4080 11100
Note
LIG Lignite N Naptha WHR Waste Heat Recovery
Page 41
Coal Lignite Gas Diesel Total
State 13500 000 180040 000 193540 000 000 000 193540
Private 86922 000 10800 000 97722 000 000 17889 115611
Central 311272 000 20701 000 331973 10283 72309 000 414565
Sub-Total 411694 000 211541 000 623235 10283 72309 17889 723716
State 272000 000 15000 000 287000 000 110282 6930 404212
Private 408078 000 000 000 408078 000 20000 34512 462590
Central 129472 000 53561 000 183034 10094 66370181 500 259998
Sub-Total 809550 000 68561 000 878112 10094 196652 41942 1126799
State 000 000 000 000 000 000 69460 25661 95121
Private 000 000 000 000 000 000 99200 62668 161868
Central 18340 000 6201 000 24541 2895 122388 000 149824
Sub-Total 18340 000 6201 000 24541 2895 291048 88329 406813
State 000 000 17500 000 17500 000 123000 12903 153403
Private 000 000 000 000 000 000 000 6483 6483
Central 50639 000 12907 000 63547 6798 109188 000 179533
Sub-Total 50639 000 30407 000 81047 6798 232188 19386 339419
State 176000 000 15000 000 191000 000 259770 12780 463550
Private 511550 000 000 000 511550 000 28800 115462 655812
Central 85458 000 26401 000 111859 19681 92342 000 223882
Sub-Total 773008 000 41401 000 814409 19681 380912 128242 1343244
State 626000 25000 60380 000 711380 000 109618 2385 823383
Private 280200 108000 000 000 388200 000 10400 730181 1128781
Central 95625 25000 22110 000 142735 55674 73901 34400 306710
Sub-Total 1001825 158000 82490 000 1242315 55674 193919 766966 2258874
State 546900 000 000 000 546900 000 72410 2510 621820
Private 871433 000 000 000 871433 000 84200 288760 1244393
Central 379639 000 54949 000 434588 28948 180253 3000 646789
Sub-Total 1797972 000 54949 000 1852921 28948 336863 294270 2513002
State 000 000 000 000 000 000 125215 6787 132002
Private 9900 000 45000 000 54900 000 8800 52620 116320
Central 34324 000 6966 000 41290 3124 47554 000 91968
Sub-Total 44224 000 51966 000 96190 3124 181569 59407 340290
State 000 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 000 3471 3471
Central 3815 000 1503 000 5317 801 10171 000 16289
Sub-Total 3815 000 1503 000 5317 801 10171 3471 19760
124953 000 29105 000 154058 23703 75145 000 252907
State 1634400 25000 287920 000 1947320 000 869755 69956 2887031
Private 2168083 108000 55800 000 2331883 000 251400 1312046 3895329
Central 1233537 25000 234406 000 1492943 162000 849622 37900 2542465
Grand Total 5036020 158000 578126 000 5772146 162000 1970777 1419902 9324825
Delhi
Haryana
Himachal Pradesh
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
NORTHERN REGION
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
(As on 30042019)
State Ownership Sector
Mode wise breakup
Grand TotalThermalNuclear Hydro
RES
(MNRE)
Jammu amp Kashmir
Punjab
Rajasthan
Uttar Pradesh
Uttarakhand
Chandigarh
Central - Unallocated
Total (Northern
Region)
(As on 30042019)
Coal Lignite Gas Diesel Total
State 000 000 000 000 000 000 000 005 005
Private 000 000 4800 000 4800 000 000 392 5192
Central 46959 000 1967 000 48926 2600 000 000 51526
Sub-Total 46959 000 6767 000 53726 2600 000 397 56723
State 000 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 000 1447 1447
Central 14141 000 4334 000 18475 700 000 000 19175
Sub-Total 14141 000 4334 000 18475 700 000 1447 20622
State 371000 104000 217782 000 692782 000 77200 6470 776452
Private 726567 50000 396000 000 1172567 000 000 833180 2005747
Central 324243 000 42400 000 366643 55900 000 24330 446873
Sub-Total 1421810 154000 656182 000 2231992 55900 77200 863980 3229072
State 540000 000 000 000 540000 000 170366 8396 718762
Private 617400 000 10000 000 627400 000 000 418040 1045440
Central 334238 000 25700 000 359938 27300 152000 30000 569238
Sub-Total 1491638 000 35700 000 1527338 27300 322366 456436 2333440
State 228000 000 000 000 228000 000 12000 1105 241105
Private 885000 000 000 000 885000 000 000 52430 937430
Central 211075 000 000 000 211075 4800 10000 000 225875
Sub-Total 1324075 000 000 000 1324075 4800 22000 53535 1404410
State 1017000 000 67200 000 1084200 000 285084 38813 1408097
Private 1245600 000 56800 000 1302400 000 48100 880441 2230941
Central 466780 000 227273 000 694053 69000 000 12300 775353
Sub-Total 2729380 000 351273 000 3080653 69000 333184 931553 4414390
State 000 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 000 546 546
Central 19560 000 6634 000 26194 900 000 000 27094
Sub-Total 19560 000 6634 000 26194 900 000 546 27640
233300 000 19759 000 253059 22800 000 000 275859
State 2156000 104000 284982 000 2544982 000 544650 54789 3144421
Private 3474567 50000 467600 000 3992167 000 48100 2186476 6226743
Central 1650295 000 328067 000 1978362 184000 162000 66630 2390992
Grand Total 7280862 154000 1080649 000 8515511 184000 754750 2307894 11762155
Goa
Daman amp Diu
Gujarat
Madhya Pradesh
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
WESTERN REGION
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
ThermalNuclear Hydro
RES
(MNRE)
State Ownership Sector
Mode wise breakup
Grand Total
Chhattisgarh
Maharashtra
Dadra amp Nagar
Naveli
Central - Unallocated
Total (Western
Region)
(As on 30042019)
Coal Lignite Gas Diesel Total
State 501000 000 23540 000 524540 000 167360 5618 697518
Private 387388 000 381318 3680 772386 000 000 743342 1515728
Central 154683 12773 000 000 167456 12727 000 25000 205183
Sub-Total 1043071 12773 404858 3680 1464382 12727 167360 773960 2418429
State 558250 000 000 000 558250 000 247993 4122 810365
Private 83945 000 83182 000 167127 000 000 393644 560771
Central 180685 14927 000 000 195612 14873 000 1000 211485
Sub-Total 822880 14927 83182 000 920989 14873 247993 398766 1582621
State 502000 000 000 12792 514792 000 358660 19389 892841
Private 195850 000 000 2520 198370 000 000 1363591 1561961
Central 242780 40140 000 000 282920 69800 000 000 352720
Sub-Total 940630 40140 000 15312 996082 69800 358660 1382979 2807521
State 000 000 000 15996 15996 000 185650 17290 218936
Private 61500 000 17400 000 78900 000 000 19021 97921
Central 86142 28180 35958 000 150280 36200 000 5000 191480
Sub-Total 147642 28180 53358 15996 245176 36200 185650 41311 508337
State 432000 000 52408 000 484408 000 217820 12270 714498
Private 458767 25000 50310 21170 555247 000 000 1229228 1784475
Central 302532 136420 000 000 438952 144800 000 23190 606942
Sub-Total 1193299 161420 102718 21170 1478607 144800 217820 1264688 3105915
State 000 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 000 000 000
Central 000 10000 000 000 10000 000 000 000 10000
Sub-Total 000 10000 000 000 10000 000 000 000 10000
State 000 000 3250 000 3250 000 000 000 3250
Private 000 000 000 000 000 000 000 314 314
Central 14080 10760 000 000 24840 8600 000 000 33440
Sub-Total 14080 10760 3250 000 28090 8600 000 314 37004
142600 35800 000 000 178400 45000 000 000 223400
State 1993250 000 79198 28788 2101236 000 1177483 58688 3337407
Private 1187450 25000 532210 27370 1772030 000 000 3749140 5521170
Central 1123502 289000 35958 000 1448460 332000 000 54190 1834650
Grand Total 4304202 314000 647366 56158 5321726 332000 1177483 3862018 10693227
Kerala
Andhra Pradesh
Telangana
Karnataka
Total (Southern
Region)
Tamil Nadu
NLC
Puducherry
Central - Unallocated
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
SOUTHERN REGION
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
State Ownership Sector
Mode wise breakup
Grand TotalThermalNuclear Hydro
RES
(MNRE)
(As on 30042019)
Coal Lignite Gas Diesel Total
State 000 000 000 000 000 000 000 7070 7070
Private 28100 000 000 000 28100 000 000 25545 53645
Central 384933 000 000 000 384933 000 11000 000 395932
Sub-Total 413033 000 000 000 413033 000 11000 32615 456647
State 42000 000 000 000 42000 000 13000 405 55405
Private 73000 000 000 000 73000 000 000 3495 76495
Central 39374 000 000 000 39374 000 6100 000 45474
Sub-Total 154374 000 000 000 154374 000 19100 3900 177374
State 540000 000 10000 000 550000 000 98600 12195 660795
Private 243700 000 000 000 243700 000 000 35250 278950
Central 76077 000 000 000 76077 000 41000 000 117077
Sub-Total 859777 000 10000 000 869777 000 139600 47445 1056822
State 000 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 000 000 000
Central 698504 000 000 000 698504 000 18620 000 717124
Sub-Total 698504 000 000 000 698504 000 18620 000 717124
State 42000 000 000 000 42000 000 206192 2630 250822
Private 293900 000 000 000 293900 000 000 47346 341246
Central 163390 000 000 000 163390 000 8900 1000 173290
Sub-Total 499290 000 000 000 499290 000 215092 50976 765358
State 000 000 000 000 000 000 36000 5211 41211
Private 000 000 000 000 000 000 39900 001 39901
Central 8703 000 000 000 8703 000 6400 000 15103
Sub-Total 8703 000 000 000 8703 000 82300 5212 96215
112683 000 000 000 112683 000 8501 000 121184
State 624000 000 10000 000 634000 000 353792 27511 1015303
Private 638700 000 000 000 638700 000 39900 111637 790237
Central 1483664 000 000 000 1483664 000 100520 1000 1585184
Grand Total 2746364 000 10000 000 2756364 000 494212 140148 3390724
Total (Eastern
Region)
Bihar
Jharkhand
West Bengal
DVC
Odisha
Sikkim
Central - Unallocated
HydroOwnership Sector
Mode wise breakup
Grand TotalThermalNuclear
RES
(MNRE)
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
State
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
EASTERN REGION
(As on 30042019)
Coal Lignite Gas Diesel Total
State 000 000 32821 000 32821 000 10000 501 43322
Private 000 000 2450 000 2450 000 000 2650 5100
Central 40852 000 43556 000 84408 000 35708 2500 122616
Sub-Total 40852 000 78827 000 119679 000 45708 5651 171038
State 000 000 000 000 000 000 000 10711 10711
Private 000 000 000 000 000 000 000 2939 2939
Central 3705 000 4682 000 8387 000 11655 000 20042
Sub-Total 3705 000 4682 000 8387 000 11655 13650 33692
State 000 000 000 000 000 000 32200 3253 35453
Private 000 000 000 000 000 000 000 012 012
Central 4560 000 10969 000 15529 000 7227 000 22756
Sub-Total 4560 000 10969 000 15529 000 39427 3265 58221
State 000 000 16950 000 16950 000 000 1601 18551
Private 000 000 000 000 000 000 000 009 009
Central 5610 000 43695 000 49305 000 6849 500 56654
Sub-Total 5610 000 60645 000 66255 000 6849 2110 75214
State 000 000 000 3600 3600 000 000 545 4145
Private 000 000 000 000 000 000 000 344 344
Central 4710 000 7157 000 11867 000 9534 000 21401
Sub-Total 4710 000 7157 3600 15467 000 9534 889 25890
State 000 000 000 000 000 000 000 3067 3067
Private 000 000 000 000 000 000 000 100 100
Central 3210 000 4893 000 8103 000 5733 000 13836
Sub-Total 3210 000 4893 000 8103 000 5733 3167 17003
State 000 000 000 000 000 000 000 3647 3647
Private 000 000 000 000 000 000 000 050 050
Central 3105 000 4046 000 7151 000 9794 000 16945
Sub-Total 3105 000 4046 000 7151 000 9794 3697 20642
11250 000 6362 000 17612 000 14000 000 31612
State 000 000 49771 3600 53371 000 42200 23325 118895
Private 000 000 2450 000 2450 000 000 6104 8554
Central 77002 000 125360 000 202362 000 100500 3000 305862
Grand Total 77002 000 177581 3600 258183 000 142700 32429 433311
Assam
Arunachal Pradesh
Meghalaya
Tripura
Manipur
Nagaland
Mizoram
Central - Unallocated
Total (North-
Eastern Region)
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
NORTH-EASTERN REGION
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
State Ownership Sector
Mode wise breakup
Grand TotalThermalNuclear Hydro
RES
(MNRE)
(As on 30042019)
Coal Lignite Gas Diesel Total
State 000 000 000 4005 4005 000 000 525 4530
Private 000 000 000 000 000 000 000 663 663
Central 000 000 000 000 000 000 000 510 510
Sub-Total 000 000 000 4005 4005 000 000 1698 5703
State 000 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 000 075 075
Central 000 000 000 000 000 000 000 000 000
Sub-Total 000 000 000 000 000 000 000 075 075
State 000 000 000 4005 4005 000 000 525 4530
Private 000 000 000 000 000 000 000 738 738
Central 000 000 000 000 000 000 000 510 510
Grand Total 000 000 000 4005 4005 000 000 1773 5778
Andaman amp
Nicobar
Lakshadweep
Total (Islands)
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
ISLANDS
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
State Ownership Sector
Mode wise breakup
Grand TotalThermalNuclear Hydro
RES
(MNRE)
SrNo Contents Page
1 Executive summary of Target and Achievement of Transmission Lines during 2019-20
20(1)
2 List of Transmission Lines CommissionedReady for commissioning during Apr-2019 20(2)
Section C - Transmission Lines
1 Executive summary of Target and Achievement of Transmission Lines during 2019-20 As on 30-04-19
(All figures in circuit kms)
Ce
ntr
al S
ecto
r
Sta
te S
ecto
r
JV
Pri
va
te S
ecto
r
To
tal
Ce
ntr
al S
ecto
r
Sta
te S
ecto
r
JV
Pri
va
te S
ecto
r
To
tal
Ce
ntr
al S
ecto
r
Sta
te S
ecto
r
JV
Pri
va
te S
ecto
r
To
tal
Ce
ntr
al S
ecto
r
Sta
te S
ecto
r
JV
Pri
va
te S
ecto
r
To
tal
Ce
ntr
al S
ecto
r
Sta
te S
ecto
r
JV
Pri
va
te S
ecto
r
To
tal
Ce
ntr
al
Se
cto
r
Sta
te S
ec
tor
JV
Pri
va
te S
ec
tor
Gra
nd
To
tal
0 0 0 0 0 0 0 0 2727 958 2334 6019 2239 3416 1143 6798 781 10023 0 10804 5747 14397 3477 23621
Apr19 Programme 0 0 0 0 0 0 0 0 577 416 557 1550 60 890 203 1153 0 309 0 309 637 1615 760 3012
Achievement 0 0 0 0 0 0 0 0 53 0 0 53 0 20 0 20 0 401 0 401 53 421 0 474
Upto Apr-19 Programme 0 0 0 0 0 0 0 0 577 416 557 1550 60 890 203 1153 0 309 0 309 637 1615 760 3012
Achievement 0 0 0 0 0 0 0 0 53 0 0 53 0 20 0 20 0 401 0 401 53 421 0 474
20(1)
220 kV Grand Total 800 kV 500 kV
Programme 2019-20
Programme
Achievement
HVDC765 kV 400 kV
Line
1 2 3 4 5 6
1 400 Bhadla (PG) - Bhadla (RVPN) line DC PGCIL 53
53
2 400 LILO of one ckt Jhanor - Navsari at Vav Ss DC GETCO 20
3 220 Banda-Chitrakoot Line DC UPPTCL 226
4 220 Gorakhpur (PG)-Gola line DC UPPTCL 82
5 220 Hapur(765) - Faridnagar line SC UPPTCL 11
6 220 Kalikiri - Madanapalli line DC APTRANSCO 60
7 220LILO of Gr Noida -Noida Sec-129 at Noida
Sec-148DC UPPTCL 1
8 220LILO of one Ckt of Badshahpur Pali at Sec-
65 GurgaonDC HVPNL 3
9 220 Sultanpur-Sangipur LILO Section at Amethi DC UPPTCL 18
421
0
474
20(2)
Grand Total
2Transmission Lines (220 kV and above) CommissionedReady for commissioning During Apr-2019
Voltage
Level (kV)Name of Transmission Lines
Circuit
Type
Executing
Agency
CENTRAL SECTOR
Total of CENTRAL SECTOR
STATE SECTOR Sector
Total of STATE SECTOR
PRIVATE SECTOR
Total of PRIVATE SECTOR
SlNo
Length(CKm)
As on 30-04-19
SN Contents Page
1 Executive summary of Target and Achievement of Substations during 2019-20 21(1)
2Sub Stations (220 kV and above) commissionedready for commisssioning during Apr-
201921(2)
Section D - Sub Stations
1 Executive summary of Target and Achievement of Substations during 2019-2020 As on 30-04-19
(All figures in circuit MVA)
Ce
ntr
al S
ecto
r
Sta
te S
ecto
r
JV
Pri
va
te S
ecto
r
To
tal
Ce
ntr
al S
ecto
r
Sta
te S
ecto
r
JV
Pri
va
te S
ecto
r
To
tal
Ce
ntr
al S
ecto
r
Sta
te S
ecto
r
JV
Pri
va
te S
ecto
r
To
tal
Ce
ntr
al S
ecto
r
Sta
te S
ecto
r
JV
Pri
va
te S
ecto
r
To
tal
Ce
ntr
al S
ecto
r
Sta
te S
ecto
r
JV
Pri
va
te S
ecto
r
To
tal
Ce
ntr
al S
ec
tor
Sta
te S
ec
tor
JV
Pri
va
te S
ec
tor
Gra
nd
To
tal
3000 0 0 3000 0 0 0 0 18000 3000 6000 27000 5205 19665 4260 29130 800 21786 0 22586 27005 44451 10260 81716
Apr19 Programme 0 0 0 0 0 0 0 0 3000 0 3000 6000 0 1000 2000 3000 0 800 0 800 3000 1800 5000 9800
Achievement 0 0 0 0 0 0 0 0 500 0 0 500 815 1980 0 2795 0 1305 0 1305 1315 3285 0 4600
Upto Apr-19 Programme 0 0 0 0 0 0 0 0 3000 0 3000 6000 0 1000 2000 3000 0 800 0 800 3000 1800 5000 9800
Achievement 0 0 0 0 0 0 0 0 500 0 0 500 815 1980 0 2795 0 1305 0 1305 1315 3285 0 4600
21(1)
220 kV Grand Total 800 kV 500 kV
Programme 2019-20
Programme
Achievement
HVDC765 kV 400 kV
As on 30-04-19
Sl Voltage Ratio Capacity
No (kVkV) (MWMVA)
1 2 3 4 5
1 Bhadla SS (3x1500 3x500 MVA) 765400 PGCIL 500
2 Extn at Tumkur (Pavagada ) PS (2x500 MVA) 400220 PGCIL 500
3 Bongaigaon (2nd ICT) Ss 400220 PGCIL 315
Total of CENTRAL SECTOR 1315
4 Motiram Adda Gorakhpur (Aug) (Additional TF) 400220 UPPTCL 240
5 Muradnagar-II Ghaziabad (Aug) (Additional TF) 400220 UPPTCL 240
6 Noida Sec- 148 GBNagar (New) 400220 UPPTCL 5007 Sarnath Varanasi (Aug) TF- II (500-315) 400220 UPPTCL 1858 Sarojininagar Lucknow Aug) TF- II (500-315) 400220 UPPTCL 185
9 Unnao (Aug) TF-III 400220 UPPTCL 31510 Nawada SS 400220 HVPNL 31511 Kharepatan SS 22033 MSETCL 2512 Prathipadu SS 220132 APTRANSCO 10013 Pali Ss 22066 HVPNL 160
14 A-5 Faridabad Ss 22066 HVPNL 60
15 Rentachintala Ss Aug(3X100-2x100) 220132 APTRANSCO 10016 Amethi Ss 220132 UPPTCL 160
17 Gajokhar Varanasi (Aug) TF- II (160-100) 220132 UPPTCL 60
18 Gola Gorakhpur (New) 220132 UPPTCL 160
19 Khurja Bulandshahr (Aug) TF- II (200-160) 220132 UPPTCL 40
20 RC Green GB Nagar (Aug) TF-II (160-100) 220132 UPPTCL 60
21 Sikandrabad Bulandshahr (Aug) (Additional TF) 220132 UPPTCL 160
22 Sitapur (Aug) (Additional TF) 220132 UPPTCL 160
23 Sohawal Ayodhya (Aug) TF-II (160-100) 220132 UPPTCL 60
TOTAL STATE SECTOR 3285
GRAND TOTAL 4600
21(2)
CENTRAL SECTOR
STATE SECTOR
2Sub-Stations (220 kV and above) CommissionedReady for commissioning During Apr-2019
Name of Sub Stations Executing Agency
SN Contents Page
1 Electricity Generation (MU) Targets and Achievements for 2019-20 22
Section E - Electricity Generation
Programme Achievement Ach Programme Achievement Ach
Central Sector 37545100 3177900 3129530 9848 3177900 3129530 9848
State Sector 37498600 3322500 2950558 8881 3322500 2950558 8881
PvtIPP Sector 37346200 3236400 3195940 9875 3236400 3195940 9875
PvtUTL Sector 1823100 159300 165579 10394 159300 165579 10394
Total 114213000 9896100 9441607 9541 9896100 9441607 9541
Central Sector 5661700 386100 481390 12468 386100 481390 12468
State Sector 6680500 498200 536514 10769 498200 536514 10769
PvtIPP Sector 1206900 57300 80405 14032 57300 80405 14032
PvtUTL Sector 144100 12300 10930 8886 12300 10930 8886
Total 13693200 953900 1109239 11628 953900 1109239 11628
Central Sector 4472000 367300 317765 8651 367300 317765 8651
Total 4472000 367300 317765 8651 367300 317765 8651
Bhutan Import 621800 17500 24396 13941 17500 24396 13941
Central Sector 47678800 3931300 3928685 9993 3931300 3928685 9993
State Sector 44179100 3820700 3487072 9127 3820700 3487072 9127
Pvt Sector 40520300 3465300 3452854 9964 3465300 3452854 9964
Total 133000000 11234800 10893007 9696 11234800 10893007 9696
Provisional based on actual-cum-Assesment
Figs in MU
Cummulative
Achievement
Cummulative
Achievement
Mar-19 Mar-18 Upto Mar-2019 Upto Mar-2018
984785 869291 12675910 10183949
22
1 Electricity Generation (MU) Targets and Achievememts for 2019-20
All India Energy Generation During Apr-19 to Apr-19 (MU)
Target (2019-20)Apr-19 to Apr-19
Sector
Hydro
Thermal
Nuclear
Renewable Energy Generation
Achievement
Apr-2019
98961
95393673
112348
94416
11092
3178
108930
0
20000
40000
60000
80000
100000
120000
Thermal Hydro Nuclear Total
Programme
Achievement
SN Contents Page
1 Energy Power Supply Position (Provisional) for Apr-2019 and during Apr-19 to Apr-19 23
2 Peak Power Supply Position (Provisional) for Apr-2019 and during Apr-19 to Apr-19 24
3 Energy Power Supply Position (Revised) for Mar-2019 and during Apr-19 to Mar-19 25
4 Peak Power Supply Position (Revised) for Mar-2019 and during Apr-19 to Mar-19 26
5 Notified Power cuts Restrictions on Industries during Apr-2019 27
6 Power Supply to Agricultural Sector during Apr-2019 28
Section F - Power supply position
आकड़ मममलयन यननट नट Figures in MU net
ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied
कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )
चडीगढ़ Chandigarh 117 117 0 00 117 117 0 00
दिलली Delhi 2698 2698 1 00 2698 2698 1 00
हरियजणज Haryana 3773 3773 0 00 3773 3773 0 00
दहमजचल परिश Himachal Pradesh 777 777 0 00 777 777 0 00
रमम कशमीि Jammu amp Kashmir 1604 1296 308 192 1604 1296 308 192
परजब Punjab 3646 3646 0 00 3646 3646 0 00
िजरसथजन Rajasthan 6210 6208 2 00 6210 6208 2 00
उतति परिश Uttar Pradesh 10179 10148 32 03 10179 10148 32 03
उततिजखड Uttarakhand 1120 1120 0 00 1120 1120 0 00
उततरी कषतर Northern Region 30094 29786 308 10 30094 29786 308 10
छततीसगढ़ Chhattisgarh 2684 2676 8 03 2684 2676 8 03
गरिजत Gujarat 10718 10718 0 00 10718 10718 0 00
मधय परिश Madhya Pradesh 6006 6006 0 00 6006 6006 0 00
महजिजषटर Maharashtra 14308 14308 0 00 14308 14308 0 00
िमन औि दिउ Daman amp Diu 220 220 0 00 220 220 0 00
िजिि व नगि हवली Dadra amp Nagar Haveli 552 552 0 00 552 552 0 00
गोवज Goa 388 388 0 00 388 388 0 00
पशचिमी कषतर Western Region 34875 34868 8 00 34875 34868 8 00
आनधर परिश Andhra Pradesh 5708 5708 0 00 5708 5708 0 00
तलगजनज Telangana 5725 5725 0 00 5725 5725 0 00
कनजाटक Karnataka 7003 7003 0 00 7003 7003 0 00
किल Kerala 2402 2400 2 01 2402 2400 2 01
तममल नजड Tamil Nadu 10010 10010 0 00 10010 10010 0 00
पडचिी Puducherry 263 263 0 00 263 263 0 00
लकष-दवीप Lakshadweep 4 4 0 0 4 4 0 0
दकषकषणी कषतर Southern Region 31111 31109 2 00 31111 31109 2 00
बबहजि Bihar 2589 2589 0 00 2589 2589 0 00
िजमोिि घजटी ननगम DVC 1772 1772 0 00 1772 1772 0 00
झजिखणड Jharkhand 689 689 0 00 689 689 0 00
ओडडशज Odisha 2689 2689 1 00 2689 2689 1 00
पशशचम बगजल West Bengal 5075 5075 0 00 5075 5075 0 00
मसशककम Sikkim 37 37 0 00 37 37 0 00
अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 7 29 27 2 7
परवी कषतर Eastern Region 12851 12850 1 00 12851 12850 1 00
अरणजचल परिश Arunachal Pradesh 66 66 0 05 66 66 0 05
असम Assam 766 709 57 75 766 709 57 75
मणणपि Manipur 68 67 1 15 68 67 1 15
मघजलय Meghalaya 170 160 10 59 170 160 10 59
ममज़ोिम Mizoram 54 53 0 08 54 53 0 08
नजगजलड Nagaland 54 54 0 08 54 54 0 08
बिपिज Tripura 122 120 1 12 122 120 1 12
उततर-परवी कषतर North-Eastern Region 1300 1228 71 55 1300 1228 71 55
समपणण भारत All India 110231 109842 389 04 110231 109842 389 04
23
ऊरजा पनत ा म कमी ऊरजा पनत ा म कमीEnergy not Supplied
Excludes energy exported to Bangladesh
Energy not Supplied
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
ऊराण वरवदयत आपरत ण शथिरत ररपोरण (परवाणरवलोकन) Energy Power Supply Position Report (Provisional)
राजयState
अपरल 2019 April2019 अपरल2019 -अपरल2019 April2019 to April2019
अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met
कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )
चडीगढ़ Chandigarh 256 256 0 00 256 256 0 00
दिलली Delhi 5664 5664 0 00 5664 5664 0 00
हरियजणज Haryana 8127 8127 0 00 8127 8127 0 00
दहमजचल परिश Himachal Pradesh 1387 1387 0 00 1387 1387 0 00
रमम कशमीि Jammu amp Kashmir 2826 2261 565 200 2826 2261 565 200
परजब Punjab 7015 7015 0 00 7015 7015 0 00
िजरसथजन Rajasthan 10560 10560 0 00 10560 10560 0 00
उतति परिश Uttar Pradesh 19935 19935 0 00 19935 19935 0 00
उततिजखड Uttarakhand 1922 1922 0 00 1922 1922 0 00
उततरी कषतर Northern Region 54476 53985 491 09 54476 53985 491 09
छततीसगढ़ Chhattisgarh 4596 4574 22 05 4596 4574 22 05
गरिजत Gujarat 17871 17865 6 00 17871 17865 6 00
मधय परिश Madhya Pradesh 10018 10018 0 00 10018 10018 0 00
महजिजषटर Maharashtra 23158 23150 8 00 23158 23150 8 00
िमन औि दिउ Daman amp Diu 341 340 1 02 341 340 1 02
िजिि व नगि हवली Dadra amp Nagar Haveli 818 818 0 00 818 818 0 00
गोवज Goa 594 594 0 00 594 594 0 00
पशचिमी कषतर Western Region 56242 56222 20 00 56242 56222 20 00
आनधर परिश Andhra Pradesh 9151 9151 0 00 9151 9151 0 00
तलगजनज Telangana 10191 10191 0 00 10191 10191 0 00
कनजाटक Karnataka 12681 12681 0 00 12681 12681 0 00
किल Kerala 4309 4300 8 02 4309 4300 8 02
तममल नजड Tamil Nadu 15972 15972 0 00 15972 15972 0 00
पडचिी Puducherry 482 480 2 05 482 480 2 05
लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0
दकषकषणी कषतर Southern Region 49155 49103 52 01 49155 49103 52 01
बबहजि Bihar 5357 5357 0 00 5357 5357 0 00
िजमोिि घजटी ननगम DVC 3039 3039 0 00 3039 3039 0 00
झजिखणड Jharkhand 1266 1266 0 00 1266 1266 0 00
ओडडशज Odisha 5389 5389 0 00 5389 5389 0 00
पशशचम बगजल West Bengal 8666 8666 0 00 8666 8666 0 00
मसशककम Sikkim 100 100 0 00 100 100 0 00
अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7
परवी कषतर Eastern Region 23349 23349 0 00 23349 23349 0 00
अरणजचल परिश Arunachal Pradesh 139 136 3 22 139 136 3 22
असम Assam 1712 1667 45 26 1712 1667 45 26
मणणपि Manipur 197 188 9 46 197 188 9 46
मघजलय Meghalaya 336 336 0 00 336 336 0 00
ममज़ोिम Mizoram 116 113 3 26 116 113 3 26
नजगजलड Nagaland 157 131 26 166 157 131 26 166
बिपिज Tripura 292 291 1 03 292 291 1 03
उततर-परवी कषतर North-Eastern Region 2848 2780 68 24 2848 2780 68 24
समपणण भारत All India 177411 176810 601 03 177411 176810 601 03
24
मजग की पनत ा म कमी Demand not Met
Excludes the supply to Bangladesh
राजयStateअपरल 2019 April2019
मजग की पनत ा म कमी Demand not Met
अधिकतम वरवदयत आपरत ण शथिरत ररपोरण (परवाणरवलोकन) Peak Power Supply Position Report (Provisional)
आकड़ मगज वजट नट Figures in MW netअपरल2019 -अपरल2019 April2019 to April2019
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
आकड़ मममलयन यननट नट Figures in MU net
ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied
कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )
चडीगढ़ Chandigarh 96 96 0 00 1561 1561 0 00
दिलली Delhi 1931 1930 1 00 32299 32282 17 01
हरियजणज Haryana 3658 3658 0 00 53665 53665 0 00
दहमजचल परिश Himachal Pradesh 832 830 2 02 9850 9618 232 24
रमम कशमीि Jammu amp Kashmir 1767 1414 353 200 19593 15868 3725 190
परजब Punjab 3585 3585 0 00 55288 55275 13 00
िजरसथजन Rajasthan 6774 6770 4 01 79826 79637 189 02
उतति परिश Uttar Pradesh 8754 8691 63 07 117101 116118 984 08
उततिजखड Uttarakhand 1067 1067 0 00 13845 13753 92 07
उततरी कषतर Northern Region 28464 28041 423 15 383028 377776 5251 14
छततीसगढ़ Chhattisgarh 2464 2457 8 03 26130 26076 54 02
गरिजत Gujarat 9890 9890 0 00 116588 116572 15 00
मधय परिश Madhya Pradesh 6236 6236 0 00 75667 75665 2 00
महजिजषटर Maharashtra 13631 13631 0 00 158285 158148 137 01
िमन औि दिउ Daman amp Diu 221 221 0 00 2557 2557 0 00
िजिि व नगि हवली Dadra amp Nagar Haveli 553 553 0 00 6317 6317 0 00
गोवज Goa 362 362 0 00 4283 4280 3 01
पशचिमी कषतर Western Region 33357 33349 8 00 389827 389615 212 01
आनधर परिश Andhra Pradesh 6072 6071 1 00 63735 63677 58 01
तलगजनज Telangana 6930 6929 1 00 66697 66635 62 01
कनजाटक Karnataka 7614 7612 1 00 71759 71690 69 01
किल Kerala 2489 2488 1 00 25029 24911 118 05
तममल नजड Tamil Nadu 10247 10245 2 00 109375 109273 102 01
पडचिी Puducherry 252 251 1 04 2761 2751 10 03
लकष-दवीप Lakshadweep 4 4 0 0 46 46 0 0
दकषकषणी कषतर Southern Region 33605 33597 8 00 339355 338938 417 01
बबहजि Bihar 2319 2318 1 00 30052 29827 225 07
िजमोिि घजटी ननगम DVC 1773 1772 1 00 22365 21995 369 17
झजिखणड Jharkhand 698 697 1 01 8682 8461 221 25
ओडडशज Odisha 2583 2582 1 00 31810 31781 30 01
पशशचम बगजल West Bengal 4585 4584 2 00 52237 52078 159 03
मसशककम Sikkim 41 41 0 00 513 512 0 01
अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 67 346 323 23 67
परवी कषतर Eastern Region 11999 11995 5 00 145658 144654 1004 07
अरणजचल परिश Arunachal Pradesh 61 60 0 06 864 855 9 10
असम Assam 680 656 23 34 9532 9204 328 34
मणणपि Manipur 68 68 1 09 916 906 10 11
मघजलय Meghalaya 173 173 0 03 1955 1953 1 01
ममज़ोिम Mizoram 50 49 0 09 668 661 8 12
नजगजलड Nagaland 58 57 1 20 902 809 93 103
बिपिज Tripura 150 150 0 00 1859 1837 21 11
उततर-परवी कषतर North-Eastern Region 1240 1214 26 21 16696 16225 471 28
समपणण भारत All India 108665 108196 469 04 1274564 1267209 7355 06
Note The revised data for March 2019 is not avaliable
Excludes energy exported to Bangladesh
राजयState
ऊराण वरवदयत आपरत ण शथिरत ररपोरण (परवाणरवलोकन) Energy Power Supply Position Report (Provisional)
25
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
Energy not Supplied Energy not Supplied
मािण2019 March2019 अपरल2018 -मािण2019 April2018 to March2019
ऊरजा पनत ा म कमी ऊरजा पनत ा म कमी
अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met
कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )
चडीगढ़ Chandigarh 223 223 0 00 369 369 0 00
दिलली Delhi 4016 4016 0 00 7016 7016 0 00
हरियजणज Haryana 6544 6544 0 00 10270 10270 0 00
दहमजचल परिश Himachal Pradesh 1683 1683 0 00 1700 1700 0 00
रमम कशमीि Jammu amp Kashmir 3277 2622 655 200 3277 2622 655 200
परजब Punjab 6564 6564 0 00 12638 12638 0 00
िजरसथजन Rajasthan 11885 11885 0 00 13276 13276 0 00
उतति परिश Uttar Pradesh 16220 16220 0 00 20498 20062 436 21
उततिजखड Uttarakhand 2002 2002 0 00 2216 2216 0 00
उततरी कषतर Northern Region 47925 47356 569 12 63166 61726 1440 23
छततीसगढ़ Chhattisgarh 4444 4128 316 71 4444 4270 174 39
गरिजत Gujarat 16263 16263 0 00 17053 16963 90 05
मधय परिश Madhya Pradesh 12328 12323 5 00 13815 13815 0 00
महजिजषटर Maharashtra 22361 22291 70 03 23864 23254 610 26
िमन औि दिउ Daman amp Diu 336 336 0 01 357 356 1 02
िजिि व नगि हवली Dadra amp Nagar Haveli 800 799 1 01 816 815 1 01
गोवज Goa 538 538 0 00 596 596 0 00
पशचिमी कषतर Western Region 53132 52965 167 03 56675 55821 853 15
आनधर परिश Andhra Pradesh 8977 8977 0 00 9459 9453 6 01
तलगजनज Telangana 10471 10471 0 00 10815 10815 0 00
कनजाटक Karnataka 12841 12841 0 00 12841 12841 0 00
किल Kerala 4264 4228 36 09 4264 4228 36 09
तममल नजड Tamil Nadu 15712 15712 0 00 15712 15712 0 00
पडचिी Puducherry 427 412 15 34 427 412 15 34
लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0
दकषकषणी कषतर Southern Region 49464 49464 0 00 49464 49464 0 00
बबहजि Bihar 4633 4633 0 00 5115 5084 31 06
िजमोिि घजटी ननगम DVC 3035 3035 0 00 3035 3035 0 00
झजिखणड Jharkhand 1210 1210 0 00 1339 1291 48 36
ओडडशज Odisha 4827 4827 0 00 5357 5357 0 00
पशशचम बगजल West Bengal 8287 8287 0 00 9130 9123 7 01
मसशककम Sikkim 100 100 0 00 106 106 0 00
अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7
परवी कषतर Eastern Region 21658 21658 0 00 23141 22733 408 18
अरणजचल परिश Arunachal Pradesh 133 131 2 15 138 138 0 01
असम Assam 1539 1508 31 20 1865 1809 56 30
मणणपि Manipur 204 199 5 25 219 216 3 12
मघजलय Meghalaya 357 357 0 00 374 372 1 04
ममज़ोिम Mizoram 108 105 3 28 121 119 2 17
नजगजलड Nagaland 127 125 2 16 156 138 18 116
बिपिज Tripura 249 249 0 00 298 293 5 17
उततर-परवी कषतर North-Eastern Region 2540 2535 5 02 2967 2850 117 39
समपणण भारत All India 169464 168745 719 04 177022 175528 1494 08
Note The revised data for March 2019 is not avaliable 26
अधिकतम वरवदयत आपरत ण शथिरत ररपोरण (परवाणरवलोकन) Peak Power Supply Position Report (Provisional)
आकड़ मगज वजट नट Figures in MW net
राजयStateमािण2019 March2019 अपरल2018 -मािण2019 April2018 to March2019
मजग की पनत ा म कमी मजग की पनत ा म कमी Demand not MetDemand not Met
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
Excludes the supply to Bangladesh
अपरल 2019 April2019 अपरल2018 -मािण2019 April2019 to April2019
उततरी कषतर Northern Region
चडीगढ़ Chandigarh(Data Not Received)दिलली Delhi
हरियजणज Haryana
दहमजचल परिश Himachal Pradeshरमम कशमीि Jammu amp Kashmir(Data
Not Received)परजब Punjab
िजरसथजन Rajasthanउतति परिश Uttar Pradesh
उततिजखड Uttarakhand
पशचिमी कषतर Western Region
छततीसगढ़ Chhattisgarh
Apr-Nov 2018- No cuts
Maximum Demand cut-58MW
Energy cut- 00020-00032 MUsday
गरिजत Gujarat
मधय परिश Madhya Pradesh
महजिजषटर Maharashtra
गोवज Goa
दकषकषणी कषतर Southern Region
आनधर परिश Andhra Pradesh
तलगजनज Telangana
कनजाटक Karnataka
किल Kerala
तममल नजड Tamil Nadu
पडचिी Puducherryपरवी कषतर Eastern Region
बबहजि Bihar
झजिखणड Jharkhand
ओडडशज Odisha
पशशचम बगजल West Bengal
No N
otifie
d Cu
ts
27
मािण 2019 म इडथरीर पर वरवदयत करौती का वरवरवरण Notified Power CutsRestrictions on Industries during April2019
राजय कषतर State Regionऊराणमाग करौती EnergyDemand Cut
No N
otifie
d Cu
tsNo
Notifie
d Cu
ts
अपरल2019 April 2019 अपरल2019 -अपरल2019 April2019 to April2019
उततरी कषतर Northern Region
चडीगढ़ Chandigarh Data not received Data not received
दिलली Delhi Data not received Data not received
हरियजणज Haryana 0811 hrsday 0811 hrsday
दहमजचल परिश Himachal Pradesh HPSEBL has only 2 agriculture consumers and uninterrupted
power is being supplied to agriculture sector
HPSEBL has only 2 agriculture consumers and uninterrupted
power is being supplied to agriculture sector
रमम कशमीि Jammu amp Kashmir Data not received Data not received
परजब Punjab 379 hrsday 379 hrsday
िजरसथजन Rajasthan 0630 hrsday 0630 hrsday
उतति परिश Uttar Pradesh 2157 hrsday 2157 hrsday
उततिजखड Uttarakhand 2359 hrsday 2359 hrsday
पशचिमी कषतर Western Region
छततीसगढ़ Chhattisgarh 18 hrsday 18 hrsday
गरिजत Gujarat 8 hrsday 8 hrsday
मधय परिश Madhya Pradesh Three-Phase Supply(Irrigation)- 0953 hrs day Three-Phase
(Mixed) Supply - 2334 hrs day
Three-Phase Supply(Irrigation)- 0953 hrs day Three-Phase
(Mixed) Supply - 2334 hrs day
महजिजषटर Maharashtra Three-Phase Supply(Irrigation)- 9 hrs day Three-Phase Supply(Irrigation)- 9 hrs day
गोवज Goa No restriction No restriction
दकषकषणी कषतर Southern Region
आनधर परिश Andhra Pradesh 07 hrsday 07 hrsday
तलगजनज Telangana 24 hrsday 24 hrsday
कनजाटक Karnataka 6 hrsday 6 hrsday
किल Kerala No Restrictions No Restrictions
तममल नजड Tamil Nadu 9 hrsday (6 hrs during day time and 3 hrs during night time) 9 hrsday (6 hrs during day time and 3 hrs during night time)
पडचिी Puducherry No Restrictions No Restrictions
परवी कषतर Eastern Region
बबहजि Bihar 18 hrsday 18 hrsday
झजिखणड Jharkhand 20 hrsday 20 hrsday
ओडडशज Odisha 24 hrsday 24 hrsday
पशशचम बगजल West Bengal 23 hrsday 23 hrsday
28
मारच 2019 कषि कषतर को षिदयत आपरतच का षििरण Power Supply to Agricultural Sector during March2019
राजय कषतर State Regionऔसत वरवदयत आपरत ण घनरो म Average Hours of Supply
On segregated feeders
SNo Contents Page
1 Growth of Installed Capacity since 6th Plan 29
2 Progress of Transmission Sector since 6th Plan 30
3 All India Yearly Coal consumption for Power Generation (Utilities)
4 All India Annual Per Capita Consumption of Electricity since -2006
5 Average cost of power supply amp Average realisation (Paisakwh)
6 Growth of Rural Electrification amp Pump Sets Energisation
7 Status of Hydro Schemes Cleared by the CEA in Apr-2019
Section G - Growth of Power Sector
31
32
(In MW)
Coal Gas Diesel Total
End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472
End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634
End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537
End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596
End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921
End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703
End of 12th Plan 19216288 2532938 83763 21832988 6780 4447842 50018 31960630
Up to Apr-2019 20070450 2493722 63763 22627934 678000 4539922 7764163 35610019
Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-17) = 51529 MW
Electricity Generation (MU) Targets and Achievements for 2016-17
Coal Gas Diesel Nuclear Hydro Res Total
2007045 2493722 637629 678000 453992 77641625 22925174
29
1 Growth of Installed Capacity Since 6th Plan
Plan YearThermal
Nuclear Hydro RES (MNRE) Total
2007045
2493722637629
678000
4539922
77641625
Total Installed Capacity 35610019 MW
Coal Gas Diesel Nuclear Hydro Res
Progress of Transmission Sector in the Country up to April 2019
1 TRANSMISSION LINES (All fig in CKM)
At the end of
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
6th plan 0 0 0 0 0 0 0 0 0 0 0 0 1831 4198 0 6029 1641 44364 0 46005 3472 48562 0 52034
7th plan 0 0 0 0 0 0 0 0 0 0 0 0 13068 6756 0 19824 4560 55071 0 59631 17628 61827 0 79455
8th plan 0 0 0 0 1634 0 0 1634 0 0 0 0 23001 13141 0 36142 6564 73036 0 79600 31199 86177 0 117376
9th plan 0 0 0 0 3234 1504 0 4738 751 409 0 1160 29345 20033 0 49378 8687 88306 0 96993 42017 110252 0 152269
10th plan 0 0 0 0 4368 1504 0 5872 1775 409 0 2184 48708 24730 0 73438 9444 105185 0 114629 64295 131828 0 196123
11th Plan 0 0 0 0 5948 1504 1980 9432 4839 411 0 5250 71023 30191 5605 106819 10140 125010 830 135980 91950 157116 8415 257481
12th Plan 6124 0 0 6124 5948 1504 1980 9432 25465 1177 4598 31240 92482 48240 17065 157787 11014 151276 978 163268 141033 202197 24621 367851
13th Plan (Up
to Mar2019)6124 0 0 6124 5948 1504 1980 9432 33692 1512 6605 41809 101335 58238 21173 180746 11734 162552 1010 175296 158833 223806 30768 413407
13th Plan (Up
to Apr-19)6124 0 0 6124 5948 1504 1980 9432 33745 1512 6605 41862 101335 58258 21173 180766 11734 162953 1010 175697 158886 224227 30768 413881
27150 600 MW of 132 kV Inter-Regional power transmission capacity links which are operated radially from time to time is not added in the total
75050
47900
24000
99050
30
Grand Total
Note - The figure upto the end of 10th plan in for stringing progress including the lines not commissioned Now only commissioned lines are reckoned Accordingly the figure for 10th plan (end) may read
as 187555 after adjusting with (-) 10852 Ckm
Inter-regional Power Transfer Capacity (MW)
plusmn 800 kV HVDC plusmn 500 kV HVDC 765 kV 400 kV 220 kV
IR addition in 12th
Plan (up to March
2017)
Inter-regional
Transmission
Capacity at the end
of Plan Period 2017-
22 (as on April19)
IR at the end of 11th
PlanIR at the end of 12th
Plan
IR Capacity Addition
at the end of Plan
Period 2017-22 (Till
April 19)
2004-05 27800
2005-06 28100
2006-07 30200
2007-08 33000
2008-09 35500
2009-10 36700
2010-11 38700
2011-12 41756
2012-13 45460
2013-14 48940
2014-15 53040
2015-16 54590
2016-17 57430
2017-18 60800
2018-19 62890
Year
2005-06
2006-07
2007-08
2008-09
2009-10
2010-11
2011-12
2012-13
2013-14
2014-15
2015-16
2016-17
2017-18
2018-19
2004-05 254 209 7568
2005-06 260 221 7636
2006-07 276 227 7423
2007-08 293 239 7727
2008-09 340 263 8713
2009-10 355 268 8870
2010-11 398 303 11975
2011-12 455 330 13514
2012-13 501 376 14867
2013-14 518 175
2014-15 520
Source- PFC Reports on the performance of State Power Utilities 31
1181
7335
7786
91441
8188
88363
957
1010
1075
1122
1149
(GrossGen+ Net Import) Mid-year population Provisional
5 Average cost of power supply amp average realization ( paiseKWH )
Yearcost of supply
(paiseunit)
Realization(paiseunit)
Including AgricultureOnly
Agriculture
6719
7171
3 All India yearly Coal Consumption for Power Generation (Utilities)
YEARCoal Consumption
Million Tonnes
4 All India Annual per Capita consumption of Electricity Since 2006
Per Capita Consumption ( kWh)
6314
Sl
NoExecuting Agency
Installed
Capacity (MW)Cost (Rs crore)
Date of
Clearance
32
Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as
Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received
from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made
available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified
villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is
independent of the earlier published reports
No Hydro Electric Project has been issued concurrenceAppraisal letter by CEA during April 2019
7 Status of Hydro Schemes Cleared by the CEA in Apr-2019
Name of Scheme
1999-002000-01
297594
010408 to 310309010409 to 310310
10th Plan
2005-062006-07
322968331020
6 Growth Of Rural Electrification amp Pumpsets Energisation
Plan Year
9th Plan2002-03
134092626
4111
Pump Sets Energised Villages Electricfied (Nos)
2001-02
284064367244
1218
27801997-981998-99
3207
482864
12632
1576036
4451722594
15455554
2314176
397343611750
2093311060316074
65109527813884
46708
18423975
499150
2003-042004-05
5743
9769
Cumu upto End of 10th Plan
010407 to 310308
010410 to 310311557976840909
010411 to 310312
412667
86293726
No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification
since 2004-05
65291374575 296361511th Plan
Cumu upto End of 11th Plan
596556 21212860
557439Cummulative up to end of 12th Plan
SN Contents Page
1 Rate of sale of power for the year 2016-17 33-41
RATE OF SALE OF POWER FOR THE YEAR 2016-17
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) NORTHERN REGION
CENTRAL SECTOR
BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 18000 66900 19800
CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 54000 222400 21600
CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 30000 144400 19600
CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 23100 91700 42600
PARBATI - III HPS NHPC LTD HYDRO-HYDRO 52000 68200 54800
DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 28000 95600 30000
CHUTAK NHPC LTD HYDRO-HYDRO 4400 22000 79800
DULHASTI HPS NHPC LTD HYDRO-HYDRO 39000 228000 56400
SALAL HPS NHPC LTD HYDRO-HYDRO 69000 342300 11000
TANAKPUR HPS NHPC LTD HYDRO-HYDRO 9420 43000 29600
URI HPS -I NHPC LTD HYDRO-HYDRO 48000 280300 16000
URI HPS - II NHPC LTD HYDRO-HYDRO 24000 147300 48600
NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 4500 24600 88200
SEWA - II NHPC LTD HYDRO-HYDRO 12000 47100 43400
ANTA CCPP NTPC LTD THERMAL-GASN 41930 67539 32400
AURAIYA CCPP NTPC LTD THERMAL-GASN 66336 53501 39100
BADARPUR TPS NTPC LTD THERMAL-COAL 70500 159153 44800
DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 84000 296170 42300
DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 98000 526686 46300
DADRI CCPP NTPC LTD THERMAL-GASHSD 82978 227469 33000
FARIDABAD CCPP NTPC LTD THERMAL-GASN 43159 115577 30800
RIHAND STPS I NTPC LTD THERMAL-COAL 100000 596766 24500
RIHAND STPS II NTPC LTD THERMAL-COAL 100000 737069 24600
RIHAND STPS III NTPC LTD THERMAL-COAL 100000 706546 30600
SINGRAULI STPS NTPC LTD THERMAL-COAL 200000 1394068 20400
TANDA TPS NTPC LTD THERMAL-COAL 44000 295438 40800
UNCHAHAR TPS I NTPC LTD THERMAL-COAL 42000 256454 39800
UNCHAHAR TPS II NTPC LTD THERMAL-COAL 42000 273577 38900
UNCHAHAR TPS III NTPC LTD THERMAL-COAL 21000 142780 43000
KOLDAM NTPC LTD HYDRO-HYDRO 80000 363260 43600
NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 303575 25841
RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 108000 668677 35374
NJHPS SJVNL HYDRO-HYDRO 150000 699496 23820
RAMPUR HPS SJVNL HYDRO-HYDRO 41202 195982 32260
TEHRI HPP THDC HYDRO-HYDRO 100000 272543 51800
KOTESHWAR HEP THDC HYDRO-HYDRO 40000 106244 53400
IGSTPS JHAJJAR ARAVALI P CPL THERMAL-COAL 150000 510429 49490
NEYVELI BARSINGSAR NEYVELI LIG CORP LTD THERMAL-LIG 25000 127520 38040
STATE SECTOR
PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 21000 14222 48200
PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 21000 19205 48400
PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 25000 102257 42600
PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 25000 62107 41800
DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 60000 312213 41000
RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 120000 35767442200
WYC HYDEL STATION HPGCL HYDRO-HYDRO 6240 20365 24900
GIRI POWER HOUSE HPSEB HYDRO-HYDRO 6000 13958 7600
ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 1695 5467 11900
BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 12000 18528 6700
GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 2250 7462 22500
BASSI POWER HOUSE HPSEB HYDRO-HYDRO 6600 29649 7500
BINWA POWER HOUSE HPSEB HYDRO-HYDRO 600 2749 19300
ANNEXURE-I
RATE OF SALE OF POWER FOR THE YEAR 2016-2017
Page 33
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) GAJ POWER HOUSE HPSEB HYDRO-HYDRO 1050 2914 26700
BANER POWER HOUSE HPSEB HYDRO-HYDRO 1200 2864 16200
HOLI POWER HOUSE HPSEB HYDRO-HYDRO 300 616 22500
THIROT POWER HOUSE HPSEB HYDRO-HYDRO 450 1126 22500
KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 1200 3064 22500
LARJI POWER HOUSE HPSEB HYDRO-HYDRO 12600 53677 23700
NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 250 750 31000
CHABA POWER HOUSE HPSEB HYDRO-HYDRO 175 465 23300
RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 150 101 13400
SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 200 000 22500
KILLAR HPSEB HYDRO-HYDRO 030 050 22500
BHABA AUGUMENP H HPSEB HYDRO-HYDRO 450 1276 22500
BS CHAMBA HPSEB HYDRO-HYDRO 045 099 19500
GUMMA HPSEB HYDRO-HYDRO 300 423 22500
GAS TURBINE POWER STATION IPGCL THERMAL-GAS 27000 67233 39300
PPS-I PPCL THERMAL-GAS 33000 175905 38300
PPS-III PPCL THERMAL-GAS 137120 196879 36100
LOWER JHELUM JampKPDD HYDRO-HYDRO 10500 60214 5100
UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 2260 10514 6300
UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 10500 44202 8500
GANDHARBAL JampKPDD HYDRO-HYDRO 1500 8925 4700
KARNAH MPH JampKPDD HYDRO-HYDRO 200 1122 31000
CHENANI I JampKPDD HYDRO-HYDRO 2330 10892 6600
CHENANI II JampKPDD HYDRO-HYDRO 200 1188 9300
CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 750 3634 14200
IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 375 2108 18500
IGO MERCHELLONG JampKPDD HYDRO-HYDRO 300 1572 29700
PAHALGAM MHP JampKPDD HYDRO-HYDRO 450 1713 32900
MARPACHOO JampKPDD HYDRO-HYDRO 075 375 29800
HAFTAL JampKPDD HYDRO-HYDRO 100 483 28700
SANJAK JampKPDD HYDRO-HYDRO 126 441 36000
SEWA-III JampKPDD HYDRO-HYDRO 900 3273 20200
BHADERWAH JampKPDD HYDRO-HYDRO 150 935 8900
BAZGO JampKPDD HYDRO-HYDRO 030 108 33300
SUMOOR JampKPDD HYDRO-HYDRO 010 045 35400
HUNDER JampKPDD HYDRO-HYDRO 040 176 26200
STAKNA JampKPDD HYDRO-HYDRO 400 1933 4100
KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 124000 662879 31360
SURATGARH TPS RRVUNL THERMAL-COAL 150000 402328 41730
CHHABRA TPS 1amp 2 RRVUNL THERMAL-COAL 50000 305946 36700
CHHABRA TPS 3 RRVUNL THERMAL-COAL 25000 151536 36700
CHHABRA TPS 4 RRVUNL THERMAL-COAL 25000 155896 36700
RAMGARH GT POWER PROJECT RRVUNL THERMAL-COAL 22050 43177 41800
RAMGARH GAS T P PROJECT 3 RRVUNL THERMAL-GAS 5000 93615 41800
DHOLPUR C C POWER PROJECT RRVUNL THERMAL-R-LNG 33000 9486 46110
MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 14000 20855 34192
MINI MICRO HYDEL (MMH) P S RRVUNL HYDRO-HYDRO 2385 851 37800
KALISINDH TPP 1 RRVUNL THERMAL-COAL 60000 341543 45000
KALISINDH TPP 2 RRVUNL THERMAL-COAL 60000 211588 45000
KHARA HEP UPJVNL HYDRO-HYDRO 7200 26654 7200
MATATILLA HEP UPJVNL HYDRO-HYDRO 3060 12219 6500
OBRA HEP UPJVNL HYDRO-HYDRO 9900 21517 6300
RIHAND UPJVNL HYDRO-HYDRO 30000 57369 5500
ANPARA A TPS UPRVUNL THERMAL-COAL 63000 317536 27000
ANPARA B TPS UPRVUNL THERMAL-COAL 100000 705605 22700
ANPARA D UPRVUNL THERMAL-COAL 100000 300158 39800
HARDUAGANJ TPS UPRVUNL THERMAL-COAL 16500 45817 49200
HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 50000 304389 46600
OBRA A TPS UPRVUNL THERMAL-COAL 28800 13158 34000
OBRA B TPS UPRVUNL THERMAL-COAL 100000 328124 21900
Page 34
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) PANKI TPS UPRVUNL THERMAL-COAL 21000 66488 50300
PARICHHA TPS UPRVUNL THERMAL-COAL 22000 38762 49400
PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 42000 231931 45600
PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 50000 276722 50400
CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 24000 70845 8290
CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 14400 75366 8390
DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 3375 9595 12080
DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 5100 18701 10520
KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4140 17359 12330
KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 12000 33001 9420
KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 3000 11953 8320
TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 9000 33983 12460
MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 30400 124510 16110
RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 19800 17897 10550
MPUR UTTARAKHAND JVNL HYDRO-HYDRO 930 5121 19200
PATHRI UTTARAKHAND JVNL HYDRO-HYDRO 2040 11636 14200
GALOGI UTTARAKHAND JVNL HYDRO-HYDRO 300 648 12500
PRIVATE SECTOR
MGTPP CLP INDIA PVT LTD THERMAL-COAL 132000 268902 41940
SHRINAGAR HEP ALAKNANDA HPCL HYDRO-HYDRO 33000 127414 48800
GAMA INFRAPROP CCPP GAMA INFRAPROP PVT THERMAL-GAS 22500 52686 47000
PPGCL (BARA) JP POWER VENTURES LTD THERMAL-COAL 198000 448200 38500
MALANA HEP MALANA PCL HYDRO-HYDRO 8600 26354 29792
MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 10000 30369 32580
ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 19200 56347 36079
KASHANG HEP H P PCL HYDRO-HYDRO 19500 5034 29200
BASPA-II HEP HBPCL HYDRO-HYDRO 30000 132769 13600
KARCHAM WANGTOO HEP HBPCL HYDRO-HYDRO 100000 434386 36600
RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 108000 582600 43700
RITHALA COMBI CY POWER PLANT TATA POWER DDL THERMAL-GAS 9480 000 11900
RAJPURA TPS NABHA POWER LTD THERMAL-GAS 140000 901484 39000
TALWANDI SABO POWER LTD TALWANDI SABO POWER LTD THERMAL-COAL 198000 636040 49548
ROJA THERMAL POWER STATION ROJA POWER SCL THERMAL-COAL 120000 727200 43400
KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 34400 63400
BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 36000 62600
MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 38200 60800
UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 37900 61500
KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 42300 58800
LALITPUR PGCL BAJAJ ENERGY PVT LTD THERMAL-COAL 198000 359400 47300
PRAYAGRAJ PGCL PRAYAGRAJ PGCL THERMAL-COAL 132000 448200 38595
KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 132000 783182 33438
WESTERN REGION
CENTRAL SECTOR
INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 100000 325333 23892
OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 52000 141663 34001
GANDHAR CCPP NTPC LTD THERMAL-GAS 65739 221924 28700
KAWAS CCPP NTPC LTD THERMAL-GASN 65620 167929 27000
KORBA I amp II NTPC LTD THERMAL-COAL 210000 1499171 20500
KORBA III NTPC LTD THERMAL-COAL 50000 358746 26600
SIPAT STPS I NTPC LTD THERMAL-COAL 198000 1479902 26800
SIPAT STPS II NTPC LTD THERMAL-COAL 100000 766549 26500
VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 126000 693142 25800
VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 100000 608781 23800
VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 100000 673475 27600
VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 100000 655924 32900
VINDHYACHAL STPS V NTPC LTD THERMAL-COAL 50000 328265 31700
MOUDA I NTPC LTD THERMAL-COAL 100000 343130 44500
MOUDA Ii NTPC LTD THERMAL-COAL 66000 40637 39900
RATNAGIRI GAS amp POWER PVT LTD RGPPL THERMAL-GAS 196708 442485 47000
KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 000 24729
TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 32000 201227 10740
Page 35
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 365122 19069
TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 787444 29324
STATE SECTOR
GSEG-HAZIRA15610 MW GUJARAT S ENEGEN LTD THERMAL-GAS 15610 1805 28200
GSEG-HAZIRA35143 MW GUJARAT S ENEGEN LTD THERMAL-GAS 35130 22276 51300
GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 21978 51800
AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 13929 26100
KORBA TPS EAST CSPGCL THERMAL-COAL 44000 198673 33880
DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 365808 27570
KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 316500 30420
HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 532878 19410
CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 515 58300
MTTPS CHAMPA U-I CSPGCL THERMAL-COAL 50000 220376 39000
MTTPS CHAMPA U-II CSPGCL THERMAL-COAL 50000 23709 10000
SHP GANGREL CSPGCL HYDRO-HYDRO 1000 2350 36790
BANGO HEP CSPGCL HYDRO-HYDRO 12000 14662 8900
MHP KORBA WEST CSPGCL HYDRO-HYDRO 170 859 38190
SIKASAR HEP CSPGCL HYDRO-HYDRO 700 418 26870
DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8843 74500
DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 19446 51500
GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 66388 71600
GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127488 41300
KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 96072 43900
KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 29841 56400
SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 184966 58800
UKAI 1-5 GSECL THERMAL-COAL 85000 204891 46900
UKAI TPS 6 GSECL THERMAL-COAL 50000 284448 48200
WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 271999 58300
WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 82808 44100
KADANA HPS GSECL HYDRO-HYDRO 24200 34433 16800
UKAI HPS GSECL HYDRO-HYDRO 30500 40585 6100
TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 123000 11500
BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 8900 10900
BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 7200 27500
JHINNA HPS MPPGCL HYDRO-HYDRO 2000 9700 18500
RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 44300 3400
GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 17300 4600
SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 4100 16900
MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 14600 27000
PENCH HPS MPPGCL HYDRO-HYDRO 16000 23700 8100
RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 3000 16900
AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 134400 35100
SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 283800 38700
SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 344600 34300
SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 111600 61600
SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 211800 58000
SSTPS PH-I MPPGCL THERMAL-COAL 120000 233100 84300
BHUSAWAL TPS MSPGCL THERMAL-COAL 142000 566258 51100
CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1365682 33700
KHAPERKHEDA MSPGCL THERMAL-COAL 134000 706207 39100
KORADI TPS MSPGCL THERMAL-COAL 62000 443206 42000
NASIK TPS MSPGCL THERMAL-COAL 63000 297275 47000
PARLI TPS MSPGCL THERMAL-COAL 113000 175934 71600
PARAS MSPGCL THERMAL-COAL 50000 267931 38700
URAN CCPP MSPGCL THERMAL-GAS 67200 320330 30600
KOYANA MSPGCL HYDRO-HYDRO 195600 328155 13100
SMALL HYDRO POWER PLANTS MSPGCL HYDRO-HYDRO 45400 93062 30500
BHIRA MSPGCL HYDRO-HYDRO 8000 10046 8400
TILLARI MSPGCL HYDRO-HYDRO 8900 10584 3100
SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 233298 20500
SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 87633 20500
PRIVATE SECTOR
Page 36
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 81282 46750
JNSTPP(JAYPEE NIGRIE) JP POWER VENTURES LTD THERMAL-COAL 132000 726695 29310
MB POWER MB POWER THERMAL-COAL 120000 345632 38310
ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 754922 28671
ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 780761 23495
ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 198000 1263784 32090
ADANI POWER MAHARA ADANI POWER LTD THERMAL-COAL 330000 1666191 34124
AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 170065 36827
SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 252035 45129
ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 458551 36000
ESSAR POWER MP LTD ESSAR POWER MP LTD THERMAL-COAL 60000 243040 28600
VEDANTA LTD (P P -I) VEDANTA LTD THERMAL-GAS 3000 15044 24000
VEDANTA LTD (P P -II) VEDANTA LTD THERMAL-GAS 3000 21293 24000
PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 8234600 24000
165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 5850 64390
145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 68717 40349
SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 132655 28776
SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 144686 38567
MUNDRA UMPPCOASTAL GUJARAT POWER
LTD THERMAL-IMP COAL 400000 2530300
23900
LANCO AMARKANTAK TPP PATHADIH
U-ILANCO AMARKAN POWER LTD THERMAL-COAL 30000 195500
29200
LANCO AMARKANTAK TPP PATHADIH
U-IILANCO AMARKAN POWER LTD THERMAL-COAL 30000 206900
27600
BARADARHA TPS D B POWER LTD THERMAL-COAL 120000 677373 29200
JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 405000 28900
JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 453000 40500
DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 339437 40700
TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 293400 44000
TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 137200 37000
TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 174900 44000
BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 92900 14100
BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23700 34300
KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 27600 48300
CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2530300 23900
BHANDARDRA HEP -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 2475 54900
SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 161400 26500
SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 445000 39000
SOTHERN REGION
CENTRAL SECTOR
NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 325699 54820
NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 305532 39880
NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 998805 38510
NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 113016 54070
NEYVELI TAMILNADU POWER LTD JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 625274 42200
VALLUR TPS NTPC TECL THERMAL-COAL 150000 856438 42350
R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 1493 84300
RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1502919 29400
RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 341291 31800
SIMHADRI I NTPC LTD THERMAL-COAL 100000 688382 36800
SIMHADRI II NTPC LTD THERMAL-COAL 100000 663657 43400
KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 593110 31324
MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 291625 21764
KKNPP-1 amp 2 NPCIL NUCLEAR-NUCLEAR 200000 572609 40948
MINICOY LAKSHADEEP THERMAL-DIESEL 340 770 29600
KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1097 29600
AMINI LAKSHADEEP THERMAL-DIESEL 265 509 29600
ANDROTT LAKSHADEEP THERMAL-DIESEL 219 524 29600
KALPENI LAKSHADEEP THERMAL-DIESEL 175 356 29600
AGATTI LAKSHADEEP THERMAL-DIESEL 195 658 29600
KADMAT LAKSHADEEP THERMAL-DIESEL 190 414 29600
KILTAN LAKSHADEEP THERMAL-DIESEL 150 269 29600
CHETLET LAKSHADEEP THERMAL-DIESEL 100 139 29600
BITRA LAKSHADEEP THERMAL-DIESEL 043 024 29600
BANGARAM LAKSHADEEP THERMAL-DIESEL 018 009 29600
Page 37
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) STATE SECTOR
Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 721811 46500
Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 50000 336142 46500
RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 237358 46500
RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 239926 46500
RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 124500 46500
SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 62109 46500
UPPER SILERU APGENCO HYDRO-HYDRO 24000 33000 46500
LOWER SILERU APGENCO HYDRO-HYDRO 46000 81066 46500
DONKARAI APGENCO HYDRO-HYDRO 2500 6007 46500
PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 1262 46500
CHETTIPETA APGENCO HYDRO-HYDRO 100 214 46500
MUCHKUND APGENCO HYDRO-HYDRO 12000 37571 46500
NAGARJUNASAGAR RCPH APGENCO HYDRO-HYDRO 9000 606 46500
TUNGABHADRA HES amp HAMPI(AP
Share)
APGENCO HYDRO-HYDRO 7200 6100 46500
KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 352232 42600
KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 288131 32500
KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 319272 46500
RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 40073 44300
KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 308317 46000
KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 308963 51300
SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 61004 76600
NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 17960 75300
PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 20873 58300
POCHAMPAD-I TSPGENCO HYDRO-HYDRO 2700 5455 29800
POCHAMPAD-II TSPGENCO HYDRO-HYDRO 900 1932 40700
NIZAMSAGAR TSPGENCO HYDRO-HYDRO 1000 1126 53400
RAICHUR TPS 1 to 7 KPCL THERMAL-COAL 147000 890866 43800
RAICHUR TPS 8 KPCL THERMAL-COAL 25000 159523 48200
BELLARI TPS 1 KPCL THERMAL-COAL 50000 318679 51100
BELLARI TPS 2 KPCL THERMAL-COAL 50000 232347 55600
BELLARI TPS 3 KPCL THERMAL-COAL 70000 47565 34400
BHADRA PH KPCL HYDRO-HYDRO 3920 2369 45900
GERUSUPPA PH KPCL HYDRO-HYDRO 24000 26990 22000
GHAT PRABHA HEP KPCL HYDRO-HYDRO 3200 4777 25300
KADRA HPS KPCL HYDRO-HYDRO 15000 16889 26800
NAGJHARI KPCL HYDRO-HYDRO 90000 155159 9800
KODASALLI DPH KPCL HYDRO-HYDRO 12000 14854 19200
MUNIRA+MGH+SPH+SPH KPCL HYDRO-HYDRO 22640 48211 7900
SHARAVATHY HPS KPCL HYDRO-HYDRO 108550 276215 5400
ALMATTI DPH KPCL HYDRO-HYDRO 29000 39611 24600
VARAHI UGPH KPCL HYDRO-HYDRO 46000 71368 15600
IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 17196 15300
IDUKKI HPS KSEB HYDRO-HYDRO 78000 137905 15300
KAKKAD HPS KSEB HYDRO-HYDRO 5000 13063 15300
KALLADA HPS KSEB HYDRO-HYDRO 1500 4436 15300
KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 46544 15300
KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 635 15300
LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 30822 15300
MALANKARA HPS KSEB HYDRO-HYDRO 1050 2474 15300
MATTUPETTY KSEB HYDRO-HYDRO 200 230 15300
MALAMPUZHA KSEB HYDRO-HYDRO 250 063 15300
CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 864 15300
URUMI ST I amp II KSEB HYDRO-HYDRO 615 903 15300
LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 248 15300
NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7765 19625 15300
PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 16601 15300
PANNIAR HPS KSEB HYDRO-HYDRO 3240 6217 15300
PORINGALKUTHU KSEB HYDRO-HYDRO 3600 10052 15300
PORINGALKUTHU LBE KSEB HYDRO-HYDRO 1600 9438 15300
PEPPARA KSEB HYDRO-HYDRO 300 395 15300
POOZHITHODE KSEB HYDRO-HYDRO 480 1045 15300
Page 38
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) PEECHI KSEB HYDRO-HYDRO 125 040 15300
RANI-PERUNADU KSEB HYDRO-HYDRO 400 585 15300
SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 79783 15300
SENGULAM HPS KSEB HYDRO-HYDRO 5120 11558 15300
SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 16711 15300
VILANGAD KSEB HYDRO-HYDRO 750 1578 15300
BARAPOLE KSEB HYDRO-HYDRO 1500 1932 15300
VELLATHOOVAL KSEB HYDRO-HYDRO 360 305 15300
CHIM0NY KSEB HYDRO-HYDRO 250 156 15300
ADYANPARA KSEB HYDRO-HYDRO 350 501 15300
BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 554 15300
KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 3801 15300
KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 23132 32800
ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 14416 62280
METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 523970 62280
METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 321270 62280
NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 336575 62280
NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 591240 62280
TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 508966 62280
KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 30897 62280
VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 18720 90699 62280
KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 33593 62280
BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 1047 62280
PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 1250 62280
PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 330 62280
MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 4897 62280
MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 032 62280
KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15681 62280
KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 40608 62280
KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 21342 62280
KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 4717 62280
KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4322 62280
KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2399 62280
METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 4416 62280
METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 8035 62280
BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2187 62280
BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2359 62280
BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2511 62280
BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 1949 62280
BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 1819 62280
POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 172 62280
SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 241 62280
MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 026 62280
THIRUMOORTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 136 62280
PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 9309 62280
VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 353 62280
SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 4192 62280
PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 6571 62280
SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 1186 62280
SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6319 62280
ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 6122 62280
KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 28674 62280
SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 18381 62280
SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 4258 62280
KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 12680 62280
KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4201 62280
ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 000 62280
PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 19175 62280
AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 078 62280
BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 504 62280
BHAVANI KATTALAI (BKB)(IIIampIII BB I amp II)TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 5847 62280
PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 000 62280
Page 39
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) SRI DAMODARAM STPS APPDCL THERMAL-COAL 160000 808108 36300
PRIVATE SECTOR
KARUPPUR TANJORE LANCO TANJORE PCL THERMAL-GAS 12000 48096 28770
SIMHAPURI ENERGY LTD SIMHAPURI ENERGY LTD THERMAL-COAL 60000 143900 39100
JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 7111 45500
SBU 1 JSW ENERGY LTD
VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 26000 159100
43300
SBU 2 JSW ENERGY LTD
VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 60000 247900
42800
LANCO KPLLANCO KONDAPALLI POWER
LTDTHERMAL-GAS 36814 85060
25776
LANCO KPL STG -IILANCO KONDAPALLI POWER
LTDTHERMAL-GAS 36600 12979
46330
LANCO KPL STG -IIIALANCO KONDAPALLI POWER
LTDTHERMAL-GAS 37100 85710
46330
LANCO KPL STG -III BLANCO KONDAPALLI POWER
LTDTHERMAL-GAS 37100 43639
46330
HINDUJA NATIONAL PCL HINDUJA NATIONAL PCL THERMAL-COAL 104000 303000 38200
MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 121164 49940
UDUPI POWER COR LTD ADANI POWER LTD THERMAL-COAL 120000 754613 42500
SPECTRUM POWER GENERATION
LTD SPECTRUM PG LTD THERMAL-GASN 20525 9256812
34952
TAQA NEYVELI POWER COM PVT
LTD TAQA NEYVELI THERMAL-LIG 25000 5840
34500
ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 251000 51000
ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 207860 36800
GMR VEMAGIRI POWER GENERATION
LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 30117
46450
EASTERN REGION
CENTRAL SECTOR
MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 64675 53113
MTPS STAGE - II KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 39000 1432 69138
BOKARO `B` TPS DVC THERMAL-COAL 63000 145670 31539
MEJIA TPS U 1-3 DVC THERMAL-COAL 63000 348298 31552
MEJIA TPS U 4 DVC THERMAL-COAL 21000 116099 34997
MEJIA TPS U 5-6 DVC THERMAL-COAL 50000 276427 35976
MEJIA TPS U 7-8 DVC THERMAL-COAL 100000 552854 36991
DURGAPUR STEEL TPS DVC THERMAL-COAL 100000 665550 39323
DURGAPUR TPS DVC THERMAL-COAL 21000 59270 35416
RAGHUNATHPUR TPS DVC THERMAL-COAL 120000 201650 35326
MAITHON HYDEL STA DVC HYDRO-HYDRO 6320 12200 17984
CHANDRAPURA TPSU1-3 DVC THERMAL-COAL 42000 257610 35095
CHANDRAPURA TPSU7-8 DVC THERMAL-COAL 50000 306673 34987
KODERMA TPS DVC THERMAL-COAL 100000 380180 38131
PANCHET HPS DVC HYDRO-HYDRO 8000 13360 17984
TILLAYA HPS DVC HYDRO-HYDRO 400 1410 17984
RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34700 35400
TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 277300 23200
TLDP -III NHPC LTD HYDRO-HYDRO 13200 55400 62000
TLDP -IV NHPC LTD HYDRO-HYDRO 16000 60300 25600
FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 957219 33700
FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 308943 41000
BONGAINGAON TPS NTPC LTD THERMAL-COAL 25000 153663 58600
KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 542277 34200
KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 942591 34200
BARH-II NTPC LTD THERMAL-COAL 132000 728021 44500
TALCHER TPS NTPC LTD THERMAL-COAL 46000 335521 30100
TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 702319 25600
TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1436521 24700
STATE SECTOR
BTPS(RampM) BIHAR STATE PGCL THERMAL-COAL 22000 12142 39700
BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 98331 10602
HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 50593 9482
CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 19689 2605
RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 53192 6033
UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 147208 14637
Page 40
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 60353 4519
IB TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 288567 25000
J P H GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 210 038 61100
MEYONG CHU GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 400 1086 61100
TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 122667 38200
DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 214339 43321
KOLAGHAT THERMAL POWER
STATION
WEST BENGAL PDCL THERMAL-COAL 126000 538269 31603
BAKRESHWAR THERMAL POWER
PLANT
WEST BENGAL PDCL THERMAL-COAL 105000 634876 32154
BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 45000 166855 33299
SANTHALDIH THERMAL POWER
STATION
WEST BENGAL PDCL THERMAL-COAL 50000 336442 34932
SAGARDIGHI THERMAL POWER
PROJECT
WEST BENGAL PDCL THERMAL-COAL 160000 423121 34705
JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 20344 68900
RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 24559 68900
TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 4623 68900
PURULIA PUMPED STORAGE
PROJECT
WEST BENGAL SEDCL HYDRO-HYDRO 90000 108816 68900
MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2768 68900
PRIVATE SECTOR
CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 49474 20230
CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 555500 70200
HALDIA ENERGY HALDIA ENERGY LTD THERMAL-COAL 60000 371000 50400
DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3688 63400
KAMALANGA TPS GMR KAMALANGA ENERGY LTD THERMAL-COAL 105000547670
33300
ADHUNIK POWER U-1 ADHUNIK POWER THERMAL-COAL 27000 158 44060
ADHUNIK POWER U-2 ADHUNIK POWER THERMAL-COAL 27000 168 44250
VL-JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 332800 23622
JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 43000 45250
JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 71700 37030
JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 70700 35920
JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 71100 38870
JOJOBERA UNIT 5 TATA POWER COM LTD THERMAL-COAL 12000 79300 44560
JOJOBERA UNIT 6 TATA POWER COM LTD THERMAL-WHR 12000 83700 12840
IEL KALINGANAGAR U-I TATA POWER COM LTD THERMAL-WG 6750 33400 22500
IEL KALINGANAGAR U-II TATA POWER COM LTD THERMAL-WG 6750 34800 22500
MAITHON UNIT 1 amp 2 TATA POWER COM LTD THERMAL-COAL 105000 678000 36100
HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 27500 24340
HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 28400 24340
HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 15800 24310
NORTH EASTERN REGION
CENTRAL SECTOR
LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 74100 36600
AGARTALA GT NEEPCO THERMAL-GAS 13500 88611 27210
ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 153111 32310
DOYANG HEP NEEPCO HYDRO-HYDRO 7500 25598 49801
KOPILI HEP NEEPCO HYDRO-HYDRO 20000 98186 11491
KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 19582 20237
KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 10310 17968
RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 124093 22945
TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 10100 17344 39000
STATE SECTOR
HYDRO POWER (122 Stns) ITANAGAR GOVT OF ARUNACHAL
PRADESHHYDRO-HYDRO 6971 6217270
24600
KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39514 17337
LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 82327 36810
NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 33318 48290
MYNTRIANG SHEP ST II ASSAM POWER GENCO HYDRO-HYDRO 300 567 35776
LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 9130 49200
LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 012 49200
DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 022 49200
TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 000 49200
UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 4990 16000
UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 6476 37000
UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 16494 14600
UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 3600 9556 15000
SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 758 8000
MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44070 44800
KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 154 41400
TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 091 41400
MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 411 41400
MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 394 41400
KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 760 41400
SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 3264 41400
LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 044 41400
BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 18953 28000
ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 43585 28200
GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 4080 11100
Note
LIG Lignite N Naptha WHR Waste Heat Recovery
Page 41
(As on 30042019)
Coal Lignite Gas Diesel Total
State 000 000 000 000 000 000 000 005 005
Private 000 000 4800 000 4800 000 000 392 5192
Central 46959 000 1967 000 48926 2600 000 000 51526
Sub-Total 46959 000 6767 000 53726 2600 000 397 56723
State 000 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 000 1447 1447
Central 14141 000 4334 000 18475 700 000 000 19175
Sub-Total 14141 000 4334 000 18475 700 000 1447 20622
State 371000 104000 217782 000 692782 000 77200 6470 776452
Private 726567 50000 396000 000 1172567 000 000 833180 2005747
Central 324243 000 42400 000 366643 55900 000 24330 446873
Sub-Total 1421810 154000 656182 000 2231992 55900 77200 863980 3229072
State 540000 000 000 000 540000 000 170366 8396 718762
Private 617400 000 10000 000 627400 000 000 418040 1045440
Central 334238 000 25700 000 359938 27300 152000 30000 569238
Sub-Total 1491638 000 35700 000 1527338 27300 322366 456436 2333440
State 228000 000 000 000 228000 000 12000 1105 241105
Private 885000 000 000 000 885000 000 000 52430 937430
Central 211075 000 000 000 211075 4800 10000 000 225875
Sub-Total 1324075 000 000 000 1324075 4800 22000 53535 1404410
State 1017000 000 67200 000 1084200 000 285084 38813 1408097
Private 1245600 000 56800 000 1302400 000 48100 880441 2230941
Central 466780 000 227273 000 694053 69000 000 12300 775353
Sub-Total 2729380 000 351273 000 3080653 69000 333184 931553 4414390
State 000 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 000 546 546
Central 19560 000 6634 000 26194 900 000 000 27094
Sub-Total 19560 000 6634 000 26194 900 000 546 27640
233300 000 19759 000 253059 22800 000 000 275859
State 2156000 104000 284982 000 2544982 000 544650 54789 3144421
Private 3474567 50000 467600 000 3992167 000 48100 2186476 6226743
Central 1650295 000 328067 000 1978362 184000 162000 66630 2390992
Grand Total 7280862 154000 1080649 000 8515511 184000 754750 2307894 11762155
Goa
Daman amp Diu
Gujarat
Madhya Pradesh
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
WESTERN REGION
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
ThermalNuclear Hydro
RES
(MNRE)
State Ownership Sector
Mode wise breakup
Grand Total
Chhattisgarh
Maharashtra
Dadra amp Nagar
Naveli
Central - Unallocated
Total (Western
Region)
(As on 30042019)
Coal Lignite Gas Diesel Total
State 501000 000 23540 000 524540 000 167360 5618 697518
Private 387388 000 381318 3680 772386 000 000 743342 1515728
Central 154683 12773 000 000 167456 12727 000 25000 205183
Sub-Total 1043071 12773 404858 3680 1464382 12727 167360 773960 2418429
State 558250 000 000 000 558250 000 247993 4122 810365
Private 83945 000 83182 000 167127 000 000 393644 560771
Central 180685 14927 000 000 195612 14873 000 1000 211485
Sub-Total 822880 14927 83182 000 920989 14873 247993 398766 1582621
State 502000 000 000 12792 514792 000 358660 19389 892841
Private 195850 000 000 2520 198370 000 000 1363591 1561961
Central 242780 40140 000 000 282920 69800 000 000 352720
Sub-Total 940630 40140 000 15312 996082 69800 358660 1382979 2807521
State 000 000 000 15996 15996 000 185650 17290 218936
Private 61500 000 17400 000 78900 000 000 19021 97921
Central 86142 28180 35958 000 150280 36200 000 5000 191480
Sub-Total 147642 28180 53358 15996 245176 36200 185650 41311 508337
State 432000 000 52408 000 484408 000 217820 12270 714498
Private 458767 25000 50310 21170 555247 000 000 1229228 1784475
Central 302532 136420 000 000 438952 144800 000 23190 606942
Sub-Total 1193299 161420 102718 21170 1478607 144800 217820 1264688 3105915
State 000 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 000 000 000
Central 000 10000 000 000 10000 000 000 000 10000
Sub-Total 000 10000 000 000 10000 000 000 000 10000
State 000 000 3250 000 3250 000 000 000 3250
Private 000 000 000 000 000 000 000 314 314
Central 14080 10760 000 000 24840 8600 000 000 33440
Sub-Total 14080 10760 3250 000 28090 8600 000 314 37004
142600 35800 000 000 178400 45000 000 000 223400
State 1993250 000 79198 28788 2101236 000 1177483 58688 3337407
Private 1187450 25000 532210 27370 1772030 000 000 3749140 5521170
Central 1123502 289000 35958 000 1448460 332000 000 54190 1834650
Grand Total 4304202 314000 647366 56158 5321726 332000 1177483 3862018 10693227
Kerala
Andhra Pradesh
Telangana
Karnataka
Total (Southern
Region)
Tamil Nadu
NLC
Puducherry
Central - Unallocated
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
SOUTHERN REGION
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
State Ownership Sector
Mode wise breakup
Grand TotalThermalNuclear Hydro
RES
(MNRE)
(As on 30042019)
Coal Lignite Gas Diesel Total
State 000 000 000 000 000 000 000 7070 7070
Private 28100 000 000 000 28100 000 000 25545 53645
Central 384933 000 000 000 384933 000 11000 000 395932
Sub-Total 413033 000 000 000 413033 000 11000 32615 456647
State 42000 000 000 000 42000 000 13000 405 55405
Private 73000 000 000 000 73000 000 000 3495 76495
Central 39374 000 000 000 39374 000 6100 000 45474
Sub-Total 154374 000 000 000 154374 000 19100 3900 177374
State 540000 000 10000 000 550000 000 98600 12195 660795
Private 243700 000 000 000 243700 000 000 35250 278950
Central 76077 000 000 000 76077 000 41000 000 117077
Sub-Total 859777 000 10000 000 869777 000 139600 47445 1056822
State 000 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 000 000 000
Central 698504 000 000 000 698504 000 18620 000 717124
Sub-Total 698504 000 000 000 698504 000 18620 000 717124
State 42000 000 000 000 42000 000 206192 2630 250822
Private 293900 000 000 000 293900 000 000 47346 341246
Central 163390 000 000 000 163390 000 8900 1000 173290
Sub-Total 499290 000 000 000 499290 000 215092 50976 765358
State 000 000 000 000 000 000 36000 5211 41211
Private 000 000 000 000 000 000 39900 001 39901
Central 8703 000 000 000 8703 000 6400 000 15103
Sub-Total 8703 000 000 000 8703 000 82300 5212 96215
112683 000 000 000 112683 000 8501 000 121184
State 624000 000 10000 000 634000 000 353792 27511 1015303
Private 638700 000 000 000 638700 000 39900 111637 790237
Central 1483664 000 000 000 1483664 000 100520 1000 1585184
Grand Total 2746364 000 10000 000 2756364 000 494212 140148 3390724
Total (Eastern
Region)
Bihar
Jharkhand
West Bengal
DVC
Odisha
Sikkim
Central - Unallocated
HydroOwnership Sector
Mode wise breakup
Grand TotalThermalNuclear
RES
(MNRE)
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
State
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
EASTERN REGION
(As on 30042019)
Coal Lignite Gas Diesel Total
State 000 000 32821 000 32821 000 10000 501 43322
Private 000 000 2450 000 2450 000 000 2650 5100
Central 40852 000 43556 000 84408 000 35708 2500 122616
Sub-Total 40852 000 78827 000 119679 000 45708 5651 171038
State 000 000 000 000 000 000 000 10711 10711
Private 000 000 000 000 000 000 000 2939 2939
Central 3705 000 4682 000 8387 000 11655 000 20042
Sub-Total 3705 000 4682 000 8387 000 11655 13650 33692
State 000 000 000 000 000 000 32200 3253 35453
Private 000 000 000 000 000 000 000 012 012
Central 4560 000 10969 000 15529 000 7227 000 22756
Sub-Total 4560 000 10969 000 15529 000 39427 3265 58221
State 000 000 16950 000 16950 000 000 1601 18551
Private 000 000 000 000 000 000 000 009 009
Central 5610 000 43695 000 49305 000 6849 500 56654
Sub-Total 5610 000 60645 000 66255 000 6849 2110 75214
State 000 000 000 3600 3600 000 000 545 4145
Private 000 000 000 000 000 000 000 344 344
Central 4710 000 7157 000 11867 000 9534 000 21401
Sub-Total 4710 000 7157 3600 15467 000 9534 889 25890
State 000 000 000 000 000 000 000 3067 3067
Private 000 000 000 000 000 000 000 100 100
Central 3210 000 4893 000 8103 000 5733 000 13836
Sub-Total 3210 000 4893 000 8103 000 5733 3167 17003
State 000 000 000 000 000 000 000 3647 3647
Private 000 000 000 000 000 000 000 050 050
Central 3105 000 4046 000 7151 000 9794 000 16945
Sub-Total 3105 000 4046 000 7151 000 9794 3697 20642
11250 000 6362 000 17612 000 14000 000 31612
State 000 000 49771 3600 53371 000 42200 23325 118895
Private 000 000 2450 000 2450 000 000 6104 8554
Central 77002 000 125360 000 202362 000 100500 3000 305862
Grand Total 77002 000 177581 3600 258183 000 142700 32429 433311
Assam
Arunachal Pradesh
Meghalaya
Tripura
Manipur
Nagaland
Mizoram
Central - Unallocated
Total (North-
Eastern Region)
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
NORTH-EASTERN REGION
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
State Ownership Sector
Mode wise breakup
Grand TotalThermalNuclear Hydro
RES
(MNRE)
(As on 30042019)
Coal Lignite Gas Diesel Total
State 000 000 000 4005 4005 000 000 525 4530
Private 000 000 000 000 000 000 000 663 663
Central 000 000 000 000 000 000 000 510 510
Sub-Total 000 000 000 4005 4005 000 000 1698 5703
State 000 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 000 075 075
Central 000 000 000 000 000 000 000 000 000
Sub-Total 000 000 000 000 000 000 000 075 075
State 000 000 000 4005 4005 000 000 525 4530
Private 000 000 000 000 000 000 000 738 738
Central 000 000 000 000 000 000 000 510 510
Grand Total 000 000 000 4005 4005 000 000 1773 5778
Andaman amp
Nicobar
Lakshadweep
Total (Islands)
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
ISLANDS
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
State Ownership Sector
Mode wise breakup
Grand TotalThermalNuclear Hydro
RES
(MNRE)
SrNo Contents Page
1 Executive summary of Target and Achievement of Transmission Lines during 2019-20
20(1)
2 List of Transmission Lines CommissionedReady for commissioning during Apr-2019 20(2)
Section C - Transmission Lines
1 Executive summary of Target and Achievement of Transmission Lines during 2019-20 As on 30-04-19
(All figures in circuit kms)
Ce
ntr
al S
ecto
r
Sta
te S
ecto
r
JV
Pri
va
te S
ecto
r
To
tal
Ce
ntr
al S
ecto
r
Sta
te S
ecto
r
JV
Pri
va
te S
ecto
r
To
tal
Ce
ntr
al S
ecto
r
Sta
te S
ecto
r
JV
Pri
va
te S
ecto
r
To
tal
Ce
ntr
al S
ecto
r
Sta
te S
ecto
r
JV
Pri
va
te S
ecto
r
To
tal
Ce
ntr
al S
ecto
r
Sta
te S
ecto
r
JV
Pri
va
te S
ecto
r
To
tal
Ce
ntr
al
Se
cto
r
Sta
te S
ec
tor
JV
Pri
va
te S
ec
tor
Gra
nd
To
tal
0 0 0 0 0 0 0 0 2727 958 2334 6019 2239 3416 1143 6798 781 10023 0 10804 5747 14397 3477 23621
Apr19 Programme 0 0 0 0 0 0 0 0 577 416 557 1550 60 890 203 1153 0 309 0 309 637 1615 760 3012
Achievement 0 0 0 0 0 0 0 0 53 0 0 53 0 20 0 20 0 401 0 401 53 421 0 474
Upto Apr-19 Programme 0 0 0 0 0 0 0 0 577 416 557 1550 60 890 203 1153 0 309 0 309 637 1615 760 3012
Achievement 0 0 0 0 0 0 0 0 53 0 0 53 0 20 0 20 0 401 0 401 53 421 0 474
20(1)
220 kV Grand Total 800 kV 500 kV
Programme 2019-20
Programme
Achievement
HVDC765 kV 400 kV
Line
1 2 3 4 5 6
1 400 Bhadla (PG) - Bhadla (RVPN) line DC PGCIL 53
53
2 400 LILO of one ckt Jhanor - Navsari at Vav Ss DC GETCO 20
3 220 Banda-Chitrakoot Line DC UPPTCL 226
4 220 Gorakhpur (PG)-Gola line DC UPPTCL 82
5 220 Hapur(765) - Faridnagar line SC UPPTCL 11
6 220 Kalikiri - Madanapalli line DC APTRANSCO 60
7 220LILO of Gr Noida -Noida Sec-129 at Noida
Sec-148DC UPPTCL 1
8 220LILO of one Ckt of Badshahpur Pali at Sec-
65 GurgaonDC HVPNL 3
9 220 Sultanpur-Sangipur LILO Section at Amethi DC UPPTCL 18
421
0
474
20(2)
Grand Total
2Transmission Lines (220 kV and above) CommissionedReady for commissioning During Apr-2019
Voltage
Level (kV)Name of Transmission Lines
Circuit
Type
Executing
Agency
CENTRAL SECTOR
Total of CENTRAL SECTOR
STATE SECTOR Sector
Total of STATE SECTOR
PRIVATE SECTOR
Total of PRIVATE SECTOR
SlNo
Length(CKm)
As on 30-04-19
SN Contents Page
1 Executive summary of Target and Achievement of Substations during 2019-20 21(1)
2Sub Stations (220 kV and above) commissionedready for commisssioning during Apr-
201921(2)
Section D - Sub Stations
1 Executive summary of Target and Achievement of Substations during 2019-2020 As on 30-04-19
(All figures in circuit MVA)
Ce
ntr
al S
ecto
r
Sta
te S
ecto
r
JV
Pri
va
te S
ecto
r
To
tal
Ce
ntr
al S
ecto
r
Sta
te S
ecto
r
JV
Pri
va
te S
ecto
r
To
tal
Ce
ntr
al S
ecto
r
Sta
te S
ecto
r
JV
Pri
va
te S
ecto
r
To
tal
Ce
ntr
al S
ecto
r
Sta
te S
ecto
r
JV
Pri
va
te S
ecto
r
To
tal
Ce
ntr
al S
ecto
r
Sta
te S
ecto
r
JV
Pri
va
te S
ecto
r
To
tal
Ce
ntr
al S
ec
tor
Sta
te S
ec
tor
JV
Pri
va
te S
ec
tor
Gra
nd
To
tal
3000 0 0 3000 0 0 0 0 18000 3000 6000 27000 5205 19665 4260 29130 800 21786 0 22586 27005 44451 10260 81716
Apr19 Programme 0 0 0 0 0 0 0 0 3000 0 3000 6000 0 1000 2000 3000 0 800 0 800 3000 1800 5000 9800
Achievement 0 0 0 0 0 0 0 0 500 0 0 500 815 1980 0 2795 0 1305 0 1305 1315 3285 0 4600
Upto Apr-19 Programme 0 0 0 0 0 0 0 0 3000 0 3000 6000 0 1000 2000 3000 0 800 0 800 3000 1800 5000 9800
Achievement 0 0 0 0 0 0 0 0 500 0 0 500 815 1980 0 2795 0 1305 0 1305 1315 3285 0 4600
21(1)
220 kV Grand Total 800 kV 500 kV
Programme 2019-20
Programme
Achievement
HVDC765 kV 400 kV
As on 30-04-19
Sl Voltage Ratio Capacity
No (kVkV) (MWMVA)
1 2 3 4 5
1 Bhadla SS (3x1500 3x500 MVA) 765400 PGCIL 500
2 Extn at Tumkur (Pavagada ) PS (2x500 MVA) 400220 PGCIL 500
3 Bongaigaon (2nd ICT) Ss 400220 PGCIL 315
Total of CENTRAL SECTOR 1315
4 Motiram Adda Gorakhpur (Aug) (Additional TF) 400220 UPPTCL 240
5 Muradnagar-II Ghaziabad (Aug) (Additional TF) 400220 UPPTCL 240
6 Noida Sec- 148 GBNagar (New) 400220 UPPTCL 5007 Sarnath Varanasi (Aug) TF- II (500-315) 400220 UPPTCL 1858 Sarojininagar Lucknow Aug) TF- II (500-315) 400220 UPPTCL 185
9 Unnao (Aug) TF-III 400220 UPPTCL 31510 Nawada SS 400220 HVPNL 31511 Kharepatan SS 22033 MSETCL 2512 Prathipadu SS 220132 APTRANSCO 10013 Pali Ss 22066 HVPNL 160
14 A-5 Faridabad Ss 22066 HVPNL 60
15 Rentachintala Ss Aug(3X100-2x100) 220132 APTRANSCO 10016 Amethi Ss 220132 UPPTCL 160
17 Gajokhar Varanasi (Aug) TF- II (160-100) 220132 UPPTCL 60
18 Gola Gorakhpur (New) 220132 UPPTCL 160
19 Khurja Bulandshahr (Aug) TF- II (200-160) 220132 UPPTCL 40
20 RC Green GB Nagar (Aug) TF-II (160-100) 220132 UPPTCL 60
21 Sikandrabad Bulandshahr (Aug) (Additional TF) 220132 UPPTCL 160
22 Sitapur (Aug) (Additional TF) 220132 UPPTCL 160
23 Sohawal Ayodhya (Aug) TF-II (160-100) 220132 UPPTCL 60
TOTAL STATE SECTOR 3285
GRAND TOTAL 4600
21(2)
CENTRAL SECTOR
STATE SECTOR
2Sub-Stations (220 kV and above) CommissionedReady for commissioning During Apr-2019
Name of Sub Stations Executing Agency
SN Contents Page
1 Electricity Generation (MU) Targets and Achievements for 2019-20 22
Section E - Electricity Generation
Programme Achievement Ach Programme Achievement Ach
Central Sector 37545100 3177900 3129530 9848 3177900 3129530 9848
State Sector 37498600 3322500 2950558 8881 3322500 2950558 8881
PvtIPP Sector 37346200 3236400 3195940 9875 3236400 3195940 9875
PvtUTL Sector 1823100 159300 165579 10394 159300 165579 10394
Total 114213000 9896100 9441607 9541 9896100 9441607 9541
Central Sector 5661700 386100 481390 12468 386100 481390 12468
State Sector 6680500 498200 536514 10769 498200 536514 10769
PvtIPP Sector 1206900 57300 80405 14032 57300 80405 14032
PvtUTL Sector 144100 12300 10930 8886 12300 10930 8886
Total 13693200 953900 1109239 11628 953900 1109239 11628
Central Sector 4472000 367300 317765 8651 367300 317765 8651
Total 4472000 367300 317765 8651 367300 317765 8651
Bhutan Import 621800 17500 24396 13941 17500 24396 13941
Central Sector 47678800 3931300 3928685 9993 3931300 3928685 9993
State Sector 44179100 3820700 3487072 9127 3820700 3487072 9127
Pvt Sector 40520300 3465300 3452854 9964 3465300 3452854 9964
Total 133000000 11234800 10893007 9696 11234800 10893007 9696
Provisional based on actual-cum-Assesment
Figs in MU
Cummulative
Achievement
Cummulative
Achievement
Mar-19 Mar-18 Upto Mar-2019 Upto Mar-2018
984785 869291 12675910 10183949
22
1 Electricity Generation (MU) Targets and Achievememts for 2019-20
All India Energy Generation During Apr-19 to Apr-19 (MU)
Target (2019-20)Apr-19 to Apr-19
Sector
Hydro
Thermal
Nuclear
Renewable Energy Generation
Achievement
Apr-2019
98961
95393673
112348
94416
11092
3178
108930
0
20000
40000
60000
80000
100000
120000
Thermal Hydro Nuclear Total
Programme
Achievement
SN Contents Page
1 Energy Power Supply Position (Provisional) for Apr-2019 and during Apr-19 to Apr-19 23
2 Peak Power Supply Position (Provisional) for Apr-2019 and during Apr-19 to Apr-19 24
3 Energy Power Supply Position (Revised) for Mar-2019 and during Apr-19 to Mar-19 25
4 Peak Power Supply Position (Revised) for Mar-2019 and during Apr-19 to Mar-19 26
5 Notified Power cuts Restrictions on Industries during Apr-2019 27
6 Power Supply to Agricultural Sector during Apr-2019 28
Section F - Power supply position
आकड़ मममलयन यननट नट Figures in MU net
ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied
कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )
चडीगढ़ Chandigarh 117 117 0 00 117 117 0 00
दिलली Delhi 2698 2698 1 00 2698 2698 1 00
हरियजणज Haryana 3773 3773 0 00 3773 3773 0 00
दहमजचल परिश Himachal Pradesh 777 777 0 00 777 777 0 00
रमम कशमीि Jammu amp Kashmir 1604 1296 308 192 1604 1296 308 192
परजब Punjab 3646 3646 0 00 3646 3646 0 00
िजरसथजन Rajasthan 6210 6208 2 00 6210 6208 2 00
उतति परिश Uttar Pradesh 10179 10148 32 03 10179 10148 32 03
उततिजखड Uttarakhand 1120 1120 0 00 1120 1120 0 00
उततरी कषतर Northern Region 30094 29786 308 10 30094 29786 308 10
छततीसगढ़ Chhattisgarh 2684 2676 8 03 2684 2676 8 03
गरिजत Gujarat 10718 10718 0 00 10718 10718 0 00
मधय परिश Madhya Pradesh 6006 6006 0 00 6006 6006 0 00
महजिजषटर Maharashtra 14308 14308 0 00 14308 14308 0 00
िमन औि दिउ Daman amp Diu 220 220 0 00 220 220 0 00
िजिि व नगि हवली Dadra amp Nagar Haveli 552 552 0 00 552 552 0 00
गोवज Goa 388 388 0 00 388 388 0 00
पशचिमी कषतर Western Region 34875 34868 8 00 34875 34868 8 00
आनधर परिश Andhra Pradesh 5708 5708 0 00 5708 5708 0 00
तलगजनज Telangana 5725 5725 0 00 5725 5725 0 00
कनजाटक Karnataka 7003 7003 0 00 7003 7003 0 00
किल Kerala 2402 2400 2 01 2402 2400 2 01
तममल नजड Tamil Nadu 10010 10010 0 00 10010 10010 0 00
पडचिी Puducherry 263 263 0 00 263 263 0 00
लकष-दवीप Lakshadweep 4 4 0 0 4 4 0 0
दकषकषणी कषतर Southern Region 31111 31109 2 00 31111 31109 2 00
बबहजि Bihar 2589 2589 0 00 2589 2589 0 00
िजमोिि घजटी ननगम DVC 1772 1772 0 00 1772 1772 0 00
झजिखणड Jharkhand 689 689 0 00 689 689 0 00
ओडडशज Odisha 2689 2689 1 00 2689 2689 1 00
पशशचम बगजल West Bengal 5075 5075 0 00 5075 5075 0 00
मसशककम Sikkim 37 37 0 00 37 37 0 00
अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 7 29 27 2 7
परवी कषतर Eastern Region 12851 12850 1 00 12851 12850 1 00
अरणजचल परिश Arunachal Pradesh 66 66 0 05 66 66 0 05
असम Assam 766 709 57 75 766 709 57 75
मणणपि Manipur 68 67 1 15 68 67 1 15
मघजलय Meghalaya 170 160 10 59 170 160 10 59
ममज़ोिम Mizoram 54 53 0 08 54 53 0 08
नजगजलड Nagaland 54 54 0 08 54 54 0 08
बिपिज Tripura 122 120 1 12 122 120 1 12
उततर-परवी कषतर North-Eastern Region 1300 1228 71 55 1300 1228 71 55
समपणण भारत All India 110231 109842 389 04 110231 109842 389 04
23
ऊरजा पनत ा म कमी ऊरजा पनत ा म कमीEnergy not Supplied
Excludes energy exported to Bangladesh
Energy not Supplied
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
ऊराण वरवदयत आपरत ण शथिरत ररपोरण (परवाणरवलोकन) Energy Power Supply Position Report (Provisional)
राजयState
अपरल 2019 April2019 अपरल2019 -अपरल2019 April2019 to April2019
अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met
कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )
चडीगढ़ Chandigarh 256 256 0 00 256 256 0 00
दिलली Delhi 5664 5664 0 00 5664 5664 0 00
हरियजणज Haryana 8127 8127 0 00 8127 8127 0 00
दहमजचल परिश Himachal Pradesh 1387 1387 0 00 1387 1387 0 00
रमम कशमीि Jammu amp Kashmir 2826 2261 565 200 2826 2261 565 200
परजब Punjab 7015 7015 0 00 7015 7015 0 00
िजरसथजन Rajasthan 10560 10560 0 00 10560 10560 0 00
उतति परिश Uttar Pradesh 19935 19935 0 00 19935 19935 0 00
उततिजखड Uttarakhand 1922 1922 0 00 1922 1922 0 00
उततरी कषतर Northern Region 54476 53985 491 09 54476 53985 491 09
छततीसगढ़ Chhattisgarh 4596 4574 22 05 4596 4574 22 05
गरिजत Gujarat 17871 17865 6 00 17871 17865 6 00
मधय परिश Madhya Pradesh 10018 10018 0 00 10018 10018 0 00
महजिजषटर Maharashtra 23158 23150 8 00 23158 23150 8 00
िमन औि दिउ Daman amp Diu 341 340 1 02 341 340 1 02
िजिि व नगि हवली Dadra amp Nagar Haveli 818 818 0 00 818 818 0 00
गोवज Goa 594 594 0 00 594 594 0 00
पशचिमी कषतर Western Region 56242 56222 20 00 56242 56222 20 00
आनधर परिश Andhra Pradesh 9151 9151 0 00 9151 9151 0 00
तलगजनज Telangana 10191 10191 0 00 10191 10191 0 00
कनजाटक Karnataka 12681 12681 0 00 12681 12681 0 00
किल Kerala 4309 4300 8 02 4309 4300 8 02
तममल नजड Tamil Nadu 15972 15972 0 00 15972 15972 0 00
पडचिी Puducherry 482 480 2 05 482 480 2 05
लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0
दकषकषणी कषतर Southern Region 49155 49103 52 01 49155 49103 52 01
बबहजि Bihar 5357 5357 0 00 5357 5357 0 00
िजमोिि घजटी ननगम DVC 3039 3039 0 00 3039 3039 0 00
झजिखणड Jharkhand 1266 1266 0 00 1266 1266 0 00
ओडडशज Odisha 5389 5389 0 00 5389 5389 0 00
पशशचम बगजल West Bengal 8666 8666 0 00 8666 8666 0 00
मसशककम Sikkim 100 100 0 00 100 100 0 00
अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7
परवी कषतर Eastern Region 23349 23349 0 00 23349 23349 0 00
अरणजचल परिश Arunachal Pradesh 139 136 3 22 139 136 3 22
असम Assam 1712 1667 45 26 1712 1667 45 26
मणणपि Manipur 197 188 9 46 197 188 9 46
मघजलय Meghalaya 336 336 0 00 336 336 0 00
ममज़ोिम Mizoram 116 113 3 26 116 113 3 26
नजगजलड Nagaland 157 131 26 166 157 131 26 166
बिपिज Tripura 292 291 1 03 292 291 1 03
उततर-परवी कषतर North-Eastern Region 2848 2780 68 24 2848 2780 68 24
समपणण भारत All India 177411 176810 601 03 177411 176810 601 03
24
मजग की पनत ा म कमी Demand not Met
Excludes the supply to Bangladesh
राजयStateअपरल 2019 April2019
मजग की पनत ा म कमी Demand not Met
अधिकतम वरवदयत आपरत ण शथिरत ररपोरण (परवाणरवलोकन) Peak Power Supply Position Report (Provisional)
आकड़ मगज वजट नट Figures in MW netअपरल2019 -अपरल2019 April2019 to April2019
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
आकड़ मममलयन यननट नट Figures in MU net
ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied
कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )
चडीगढ़ Chandigarh 96 96 0 00 1561 1561 0 00
दिलली Delhi 1931 1930 1 00 32299 32282 17 01
हरियजणज Haryana 3658 3658 0 00 53665 53665 0 00
दहमजचल परिश Himachal Pradesh 832 830 2 02 9850 9618 232 24
रमम कशमीि Jammu amp Kashmir 1767 1414 353 200 19593 15868 3725 190
परजब Punjab 3585 3585 0 00 55288 55275 13 00
िजरसथजन Rajasthan 6774 6770 4 01 79826 79637 189 02
उतति परिश Uttar Pradesh 8754 8691 63 07 117101 116118 984 08
उततिजखड Uttarakhand 1067 1067 0 00 13845 13753 92 07
उततरी कषतर Northern Region 28464 28041 423 15 383028 377776 5251 14
छततीसगढ़ Chhattisgarh 2464 2457 8 03 26130 26076 54 02
गरिजत Gujarat 9890 9890 0 00 116588 116572 15 00
मधय परिश Madhya Pradesh 6236 6236 0 00 75667 75665 2 00
महजिजषटर Maharashtra 13631 13631 0 00 158285 158148 137 01
िमन औि दिउ Daman amp Diu 221 221 0 00 2557 2557 0 00
िजिि व नगि हवली Dadra amp Nagar Haveli 553 553 0 00 6317 6317 0 00
गोवज Goa 362 362 0 00 4283 4280 3 01
पशचिमी कषतर Western Region 33357 33349 8 00 389827 389615 212 01
आनधर परिश Andhra Pradesh 6072 6071 1 00 63735 63677 58 01
तलगजनज Telangana 6930 6929 1 00 66697 66635 62 01
कनजाटक Karnataka 7614 7612 1 00 71759 71690 69 01
किल Kerala 2489 2488 1 00 25029 24911 118 05
तममल नजड Tamil Nadu 10247 10245 2 00 109375 109273 102 01
पडचिी Puducherry 252 251 1 04 2761 2751 10 03
लकष-दवीप Lakshadweep 4 4 0 0 46 46 0 0
दकषकषणी कषतर Southern Region 33605 33597 8 00 339355 338938 417 01
बबहजि Bihar 2319 2318 1 00 30052 29827 225 07
िजमोिि घजटी ननगम DVC 1773 1772 1 00 22365 21995 369 17
झजिखणड Jharkhand 698 697 1 01 8682 8461 221 25
ओडडशज Odisha 2583 2582 1 00 31810 31781 30 01
पशशचम बगजल West Bengal 4585 4584 2 00 52237 52078 159 03
मसशककम Sikkim 41 41 0 00 513 512 0 01
अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 67 346 323 23 67
परवी कषतर Eastern Region 11999 11995 5 00 145658 144654 1004 07
अरणजचल परिश Arunachal Pradesh 61 60 0 06 864 855 9 10
असम Assam 680 656 23 34 9532 9204 328 34
मणणपि Manipur 68 68 1 09 916 906 10 11
मघजलय Meghalaya 173 173 0 03 1955 1953 1 01
ममज़ोिम Mizoram 50 49 0 09 668 661 8 12
नजगजलड Nagaland 58 57 1 20 902 809 93 103
बिपिज Tripura 150 150 0 00 1859 1837 21 11
उततर-परवी कषतर North-Eastern Region 1240 1214 26 21 16696 16225 471 28
समपणण भारत All India 108665 108196 469 04 1274564 1267209 7355 06
Note The revised data for March 2019 is not avaliable
Excludes energy exported to Bangladesh
राजयState
ऊराण वरवदयत आपरत ण शथिरत ररपोरण (परवाणरवलोकन) Energy Power Supply Position Report (Provisional)
25
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
Energy not Supplied Energy not Supplied
मािण2019 March2019 अपरल2018 -मािण2019 April2018 to March2019
ऊरजा पनत ा म कमी ऊरजा पनत ा म कमी
अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met
कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )
चडीगढ़ Chandigarh 223 223 0 00 369 369 0 00
दिलली Delhi 4016 4016 0 00 7016 7016 0 00
हरियजणज Haryana 6544 6544 0 00 10270 10270 0 00
दहमजचल परिश Himachal Pradesh 1683 1683 0 00 1700 1700 0 00
रमम कशमीि Jammu amp Kashmir 3277 2622 655 200 3277 2622 655 200
परजब Punjab 6564 6564 0 00 12638 12638 0 00
िजरसथजन Rajasthan 11885 11885 0 00 13276 13276 0 00
उतति परिश Uttar Pradesh 16220 16220 0 00 20498 20062 436 21
उततिजखड Uttarakhand 2002 2002 0 00 2216 2216 0 00
उततरी कषतर Northern Region 47925 47356 569 12 63166 61726 1440 23
छततीसगढ़ Chhattisgarh 4444 4128 316 71 4444 4270 174 39
गरिजत Gujarat 16263 16263 0 00 17053 16963 90 05
मधय परिश Madhya Pradesh 12328 12323 5 00 13815 13815 0 00
महजिजषटर Maharashtra 22361 22291 70 03 23864 23254 610 26
िमन औि दिउ Daman amp Diu 336 336 0 01 357 356 1 02
िजिि व नगि हवली Dadra amp Nagar Haveli 800 799 1 01 816 815 1 01
गोवज Goa 538 538 0 00 596 596 0 00
पशचिमी कषतर Western Region 53132 52965 167 03 56675 55821 853 15
आनधर परिश Andhra Pradesh 8977 8977 0 00 9459 9453 6 01
तलगजनज Telangana 10471 10471 0 00 10815 10815 0 00
कनजाटक Karnataka 12841 12841 0 00 12841 12841 0 00
किल Kerala 4264 4228 36 09 4264 4228 36 09
तममल नजड Tamil Nadu 15712 15712 0 00 15712 15712 0 00
पडचिी Puducherry 427 412 15 34 427 412 15 34
लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0
दकषकषणी कषतर Southern Region 49464 49464 0 00 49464 49464 0 00
बबहजि Bihar 4633 4633 0 00 5115 5084 31 06
िजमोिि घजटी ननगम DVC 3035 3035 0 00 3035 3035 0 00
झजिखणड Jharkhand 1210 1210 0 00 1339 1291 48 36
ओडडशज Odisha 4827 4827 0 00 5357 5357 0 00
पशशचम बगजल West Bengal 8287 8287 0 00 9130 9123 7 01
मसशककम Sikkim 100 100 0 00 106 106 0 00
अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7
परवी कषतर Eastern Region 21658 21658 0 00 23141 22733 408 18
अरणजचल परिश Arunachal Pradesh 133 131 2 15 138 138 0 01
असम Assam 1539 1508 31 20 1865 1809 56 30
मणणपि Manipur 204 199 5 25 219 216 3 12
मघजलय Meghalaya 357 357 0 00 374 372 1 04
ममज़ोिम Mizoram 108 105 3 28 121 119 2 17
नजगजलड Nagaland 127 125 2 16 156 138 18 116
बिपिज Tripura 249 249 0 00 298 293 5 17
उततर-परवी कषतर North-Eastern Region 2540 2535 5 02 2967 2850 117 39
समपणण भारत All India 169464 168745 719 04 177022 175528 1494 08
Note The revised data for March 2019 is not avaliable 26
अधिकतम वरवदयत आपरत ण शथिरत ररपोरण (परवाणरवलोकन) Peak Power Supply Position Report (Provisional)
आकड़ मगज वजट नट Figures in MW net
राजयStateमािण2019 March2019 अपरल2018 -मािण2019 April2018 to March2019
मजग की पनत ा म कमी मजग की पनत ा म कमी Demand not MetDemand not Met
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
Excludes the supply to Bangladesh
अपरल 2019 April2019 अपरल2018 -मािण2019 April2019 to April2019
उततरी कषतर Northern Region
चडीगढ़ Chandigarh(Data Not Received)दिलली Delhi
हरियजणज Haryana
दहमजचल परिश Himachal Pradeshरमम कशमीि Jammu amp Kashmir(Data
Not Received)परजब Punjab
िजरसथजन Rajasthanउतति परिश Uttar Pradesh
उततिजखड Uttarakhand
पशचिमी कषतर Western Region
छततीसगढ़ Chhattisgarh
Apr-Nov 2018- No cuts
Maximum Demand cut-58MW
Energy cut- 00020-00032 MUsday
गरिजत Gujarat
मधय परिश Madhya Pradesh
महजिजषटर Maharashtra
गोवज Goa
दकषकषणी कषतर Southern Region
आनधर परिश Andhra Pradesh
तलगजनज Telangana
कनजाटक Karnataka
किल Kerala
तममल नजड Tamil Nadu
पडचिी Puducherryपरवी कषतर Eastern Region
बबहजि Bihar
झजिखणड Jharkhand
ओडडशज Odisha
पशशचम बगजल West Bengal
No N
otifie
d Cu
ts
27
मािण 2019 म इडथरीर पर वरवदयत करौती का वरवरवरण Notified Power CutsRestrictions on Industries during April2019
राजय कषतर State Regionऊराणमाग करौती EnergyDemand Cut
No N
otifie
d Cu
tsNo
Notifie
d Cu
ts
अपरल2019 April 2019 अपरल2019 -अपरल2019 April2019 to April2019
उततरी कषतर Northern Region
चडीगढ़ Chandigarh Data not received Data not received
दिलली Delhi Data not received Data not received
हरियजणज Haryana 0811 hrsday 0811 hrsday
दहमजचल परिश Himachal Pradesh HPSEBL has only 2 agriculture consumers and uninterrupted
power is being supplied to agriculture sector
HPSEBL has only 2 agriculture consumers and uninterrupted
power is being supplied to agriculture sector
रमम कशमीि Jammu amp Kashmir Data not received Data not received
परजब Punjab 379 hrsday 379 hrsday
िजरसथजन Rajasthan 0630 hrsday 0630 hrsday
उतति परिश Uttar Pradesh 2157 hrsday 2157 hrsday
उततिजखड Uttarakhand 2359 hrsday 2359 hrsday
पशचिमी कषतर Western Region
छततीसगढ़ Chhattisgarh 18 hrsday 18 hrsday
गरिजत Gujarat 8 hrsday 8 hrsday
मधय परिश Madhya Pradesh Three-Phase Supply(Irrigation)- 0953 hrs day Three-Phase
(Mixed) Supply - 2334 hrs day
Three-Phase Supply(Irrigation)- 0953 hrs day Three-Phase
(Mixed) Supply - 2334 hrs day
महजिजषटर Maharashtra Three-Phase Supply(Irrigation)- 9 hrs day Three-Phase Supply(Irrigation)- 9 hrs day
गोवज Goa No restriction No restriction
दकषकषणी कषतर Southern Region
आनधर परिश Andhra Pradesh 07 hrsday 07 hrsday
तलगजनज Telangana 24 hrsday 24 hrsday
कनजाटक Karnataka 6 hrsday 6 hrsday
किल Kerala No Restrictions No Restrictions
तममल नजड Tamil Nadu 9 hrsday (6 hrs during day time and 3 hrs during night time) 9 hrsday (6 hrs during day time and 3 hrs during night time)
पडचिी Puducherry No Restrictions No Restrictions
परवी कषतर Eastern Region
बबहजि Bihar 18 hrsday 18 hrsday
झजिखणड Jharkhand 20 hrsday 20 hrsday
ओडडशज Odisha 24 hrsday 24 hrsday
पशशचम बगजल West Bengal 23 hrsday 23 hrsday
28
मारच 2019 कषि कषतर को षिदयत आपरतच का षििरण Power Supply to Agricultural Sector during March2019
राजय कषतर State Regionऔसत वरवदयत आपरत ण घनरो म Average Hours of Supply
On segregated feeders
SNo Contents Page
1 Growth of Installed Capacity since 6th Plan 29
2 Progress of Transmission Sector since 6th Plan 30
3 All India Yearly Coal consumption for Power Generation (Utilities)
4 All India Annual Per Capita Consumption of Electricity since -2006
5 Average cost of power supply amp Average realisation (Paisakwh)
6 Growth of Rural Electrification amp Pump Sets Energisation
7 Status of Hydro Schemes Cleared by the CEA in Apr-2019
Section G - Growth of Power Sector
31
32
(In MW)
Coal Gas Diesel Total
End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472
End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634
End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537
End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596
End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921
End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703
End of 12th Plan 19216288 2532938 83763 21832988 6780 4447842 50018 31960630
Up to Apr-2019 20070450 2493722 63763 22627934 678000 4539922 7764163 35610019
Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-17) = 51529 MW
Electricity Generation (MU) Targets and Achievements for 2016-17
Coal Gas Diesel Nuclear Hydro Res Total
2007045 2493722 637629 678000 453992 77641625 22925174
29
1 Growth of Installed Capacity Since 6th Plan
Plan YearThermal
Nuclear Hydro RES (MNRE) Total
2007045
2493722637629
678000
4539922
77641625
Total Installed Capacity 35610019 MW
Coal Gas Diesel Nuclear Hydro Res
Progress of Transmission Sector in the Country up to April 2019
1 TRANSMISSION LINES (All fig in CKM)
At the end of
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
6th plan 0 0 0 0 0 0 0 0 0 0 0 0 1831 4198 0 6029 1641 44364 0 46005 3472 48562 0 52034
7th plan 0 0 0 0 0 0 0 0 0 0 0 0 13068 6756 0 19824 4560 55071 0 59631 17628 61827 0 79455
8th plan 0 0 0 0 1634 0 0 1634 0 0 0 0 23001 13141 0 36142 6564 73036 0 79600 31199 86177 0 117376
9th plan 0 0 0 0 3234 1504 0 4738 751 409 0 1160 29345 20033 0 49378 8687 88306 0 96993 42017 110252 0 152269
10th plan 0 0 0 0 4368 1504 0 5872 1775 409 0 2184 48708 24730 0 73438 9444 105185 0 114629 64295 131828 0 196123
11th Plan 0 0 0 0 5948 1504 1980 9432 4839 411 0 5250 71023 30191 5605 106819 10140 125010 830 135980 91950 157116 8415 257481
12th Plan 6124 0 0 6124 5948 1504 1980 9432 25465 1177 4598 31240 92482 48240 17065 157787 11014 151276 978 163268 141033 202197 24621 367851
13th Plan (Up
to Mar2019)6124 0 0 6124 5948 1504 1980 9432 33692 1512 6605 41809 101335 58238 21173 180746 11734 162552 1010 175296 158833 223806 30768 413407
13th Plan (Up
to Apr-19)6124 0 0 6124 5948 1504 1980 9432 33745 1512 6605 41862 101335 58258 21173 180766 11734 162953 1010 175697 158886 224227 30768 413881
27150 600 MW of 132 kV Inter-Regional power transmission capacity links which are operated radially from time to time is not added in the total
75050
47900
24000
99050
30
Grand Total
Note - The figure upto the end of 10th plan in for stringing progress including the lines not commissioned Now only commissioned lines are reckoned Accordingly the figure for 10th plan (end) may read
as 187555 after adjusting with (-) 10852 Ckm
Inter-regional Power Transfer Capacity (MW)
plusmn 800 kV HVDC plusmn 500 kV HVDC 765 kV 400 kV 220 kV
IR addition in 12th
Plan (up to March
2017)
Inter-regional
Transmission
Capacity at the end
of Plan Period 2017-
22 (as on April19)
IR at the end of 11th
PlanIR at the end of 12th
Plan
IR Capacity Addition
at the end of Plan
Period 2017-22 (Till
April 19)
2004-05 27800
2005-06 28100
2006-07 30200
2007-08 33000
2008-09 35500
2009-10 36700
2010-11 38700
2011-12 41756
2012-13 45460
2013-14 48940
2014-15 53040
2015-16 54590
2016-17 57430
2017-18 60800
2018-19 62890
Year
2005-06
2006-07
2007-08
2008-09
2009-10
2010-11
2011-12
2012-13
2013-14
2014-15
2015-16
2016-17
2017-18
2018-19
2004-05 254 209 7568
2005-06 260 221 7636
2006-07 276 227 7423
2007-08 293 239 7727
2008-09 340 263 8713
2009-10 355 268 8870
2010-11 398 303 11975
2011-12 455 330 13514
2012-13 501 376 14867
2013-14 518 175
2014-15 520
Source- PFC Reports on the performance of State Power Utilities 31
1181
7335
7786
91441
8188
88363
957
1010
1075
1122
1149
(GrossGen+ Net Import) Mid-year population Provisional
5 Average cost of power supply amp average realization ( paiseKWH )
Yearcost of supply
(paiseunit)
Realization(paiseunit)
Including AgricultureOnly
Agriculture
6719
7171
3 All India yearly Coal Consumption for Power Generation (Utilities)
YEARCoal Consumption
Million Tonnes
4 All India Annual per Capita consumption of Electricity Since 2006
Per Capita Consumption ( kWh)
6314
Sl
NoExecuting Agency
Installed
Capacity (MW)Cost (Rs crore)
Date of
Clearance
32
Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as
Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received
from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made
available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified
villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is
independent of the earlier published reports
No Hydro Electric Project has been issued concurrenceAppraisal letter by CEA during April 2019
7 Status of Hydro Schemes Cleared by the CEA in Apr-2019
Name of Scheme
1999-002000-01
297594
010408 to 310309010409 to 310310
10th Plan
2005-062006-07
322968331020
6 Growth Of Rural Electrification amp Pumpsets Energisation
Plan Year
9th Plan2002-03
134092626
4111
Pump Sets Energised Villages Electricfied (Nos)
2001-02
284064367244
1218
27801997-981998-99
3207
482864
12632
1576036
4451722594
15455554
2314176
397343611750
2093311060316074
65109527813884
46708
18423975
499150
2003-042004-05
5743
9769
Cumu upto End of 10th Plan
010407 to 310308
010410 to 310311557976840909
010411 to 310312
412667
86293726
No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification
since 2004-05
65291374575 296361511th Plan
Cumu upto End of 11th Plan
596556 21212860
557439Cummulative up to end of 12th Plan
SN Contents Page
1 Rate of sale of power for the year 2016-17 33-41
RATE OF SALE OF POWER FOR THE YEAR 2016-17
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) NORTHERN REGION
CENTRAL SECTOR
BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 18000 66900 19800
CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 54000 222400 21600
CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 30000 144400 19600
CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 23100 91700 42600
PARBATI - III HPS NHPC LTD HYDRO-HYDRO 52000 68200 54800
DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 28000 95600 30000
CHUTAK NHPC LTD HYDRO-HYDRO 4400 22000 79800
DULHASTI HPS NHPC LTD HYDRO-HYDRO 39000 228000 56400
SALAL HPS NHPC LTD HYDRO-HYDRO 69000 342300 11000
TANAKPUR HPS NHPC LTD HYDRO-HYDRO 9420 43000 29600
URI HPS -I NHPC LTD HYDRO-HYDRO 48000 280300 16000
URI HPS - II NHPC LTD HYDRO-HYDRO 24000 147300 48600
NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 4500 24600 88200
SEWA - II NHPC LTD HYDRO-HYDRO 12000 47100 43400
ANTA CCPP NTPC LTD THERMAL-GASN 41930 67539 32400
AURAIYA CCPP NTPC LTD THERMAL-GASN 66336 53501 39100
BADARPUR TPS NTPC LTD THERMAL-COAL 70500 159153 44800
DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 84000 296170 42300
DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 98000 526686 46300
DADRI CCPP NTPC LTD THERMAL-GASHSD 82978 227469 33000
FARIDABAD CCPP NTPC LTD THERMAL-GASN 43159 115577 30800
RIHAND STPS I NTPC LTD THERMAL-COAL 100000 596766 24500
RIHAND STPS II NTPC LTD THERMAL-COAL 100000 737069 24600
RIHAND STPS III NTPC LTD THERMAL-COAL 100000 706546 30600
SINGRAULI STPS NTPC LTD THERMAL-COAL 200000 1394068 20400
TANDA TPS NTPC LTD THERMAL-COAL 44000 295438 40800
UNCHAHAR TPS I NTPC LTD THERMAL-COAL 42000 256454 39800
UNCHAHAR TPS II NTPC LTD THERMAL-COAL 42000 273577 38900
UNCHAHAR TPS III NTPC LTD THERMAL-COAL 21000 142780 43000
KOLDAM NTPC LTD HYDRO-HYDRO 80000 363260 43600
NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 303575 25841
RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 108000 668677 35374
NJHPS SJVNL HYDRO-HYDRO 150000 699496 23820
RAMPUR HPS SJVNL HYDRO-HYDRO 41202 195982 32260
TEHRI HPP THDC HYDRO-HYDRO 100000 272543 51800
KOTESHWAR HEP THDC HYDRO-HYDRO 40000 106244 53400
IGSTPS JHAJJAR ARAVALI P CPL THERMAL-COAL 150000 510429 49490
NEYVELI BARSINGSAR NEYVELI LIG CORP LTD THERMAL-LIG 25000 127520 38040
STATE SECTOR
PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 21000 14222 48200
PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 21000 19205 48400
PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 25000 102257 42600
PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 25000 62107 41800
DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 60000 312213 41000
RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 120000 35767442200
WYC HYDEL STATION HPGCL HYDRO-HYDRO 6240 20365 24900
GIRI POWER HOUSE HPSEB HYDRO-HYDRO 6000 13958 7600
ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 1695 5467 11900
BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 12000 18528 6700
GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 2250 7462 22500
BASSI POWER HOUSE HPSEB HYDRO-HYDRO 6600 29649 7500
BINWA POWER HOUSE HPSEB HYDRO-HYDRO 600 2749 19300
ANNEXURE-I
RATE OF SALE OF POWER FOR THE YEAR 2016-2017
Page 33
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) GAJ POWER HOUSE HPSEB HYDRO-HYDRO 1050 2914 26700
BANER POWER HOUSE HPSEB HYDRO-HYDRO 1200 2864 16200
HOLI POWER HOUSE HPSEB HYDRO-HYDRO 300 616 22500
THIROT POWER HOUSE HPSEB HYDRO-HYDRO 450 1126 22500
KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 1200 3064 22500
LARJI POWER HOUSE HPSEB HYDRO-HYDRO 12600 53677 23700
NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 250 750 31000
CHABA POWER HOUSE HPSEB HYDRO-HYDRO 175 465 23300
RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 150 101 13400
SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 200 000 22500
KILLAR HPSEB HYDRO-HYDRO 030 050 22500
BHABA AUGUMENP H HPSEB HYDRO-HYDRO 450 1276 22500
BS CHAMBA HPSEB HYDRO-HYDRO 045 099 19500
GUMMA HPSEB HYDRO-HYDRO 300 423 22500
GAS TURBINE POWER STATION IPGCL THERMAL-GAS 27000 67233 39300
PPS-I PPCL THERMAL-GAS 33000 175905 38300
PPS-III PPCL THERMAL-GAS 137120 196879 36100
LOWER JHELUM JampKPDD HYDRO-HYDRO 10500 60214 5100
UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 2260 10514 6300
UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 10500 44202 8500
GANDHARBAL JampKPDD HYDRO-HYDRO 1500 8925 4700
KARNAH MPH JampKPDD HYDRO-HYDRO 200 1122 31000
CHENANI I JampKPDD HYDRO-HYDRO 2330 10892 6600
CHENANI II JampKPDD HYDRO-HYDRO 200 1188 9300
CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 750 3634 14200
IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 375 2108 18500
IGO MERCHELLONG JampKPDD HYDRO-HYDRO 300 1572 29700
PAHALGAM MHP JampKPDD HYDRO-HYDRO 450 1713 32900
MARPACHOO JampKPDD HYDRO-HYDRO 075 375 29800
HAFTAL JampKPDD HYDRO-HYDRO 100 483 28700
SANJAK JampKPDD HYDRO-HYDRO 126 441 36000
SEWA-III JampKPDD HYDRO-HYDRO 900 3273 20200
BHADERWAH JampKPDD HYDRO-HYDRO 150 935 8900
BAZGO JampKPDD HYDRO-HYDRO 030 108 33300
SUMOOR JampKPDD HYDRO-HYDRO 010 045 35400
HUNDER JampKPDD HYDRO-HYDRO 040 176 26200
STAKNA JampKPDD HYDRO-HYDRO 400 1933 4100
KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 124000 662879 31360
SURATGARH TPS RRVUNL THERMAL-COAL 150000 402328 41730
CHHABRA TPS 1amp 2 RRVUNL THERMAL-COAL 50000 305946 36700
CHHABRA TPS 3 RRVUNL THERMAL-COAL 25000 151536 36700
CHHABRA TPS 4 RRVUNL THERMAL-COAL 25000 155896 36700
RAMGARH GT POWER PROJECT RRVUNL THERMAL-COAL 22050 43177 41800
RAMGARH GAS T P PROJECT 3 RRVUNL THERMAL-GAS 5000 93615 41800
DHOLPUR C C POWER PROJECT RRVUNL THERMAL-R-LNG 33000 9486 46110
MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 14000 20855 34192
MINI MICRO HYDEL (MMH) P S RRVUNL HYDRO-HYDRO 2385 851 37800
KALISINDH TPP 1 RRVUNL THERMAL-COAL 60000 341543 45000
KALISINDH TPP 2 RRVUNL THERMAL-COAL 60000 211588 45000
KHARA HEP UPJVNL HYDRO-HYDRO 7200 26654 7200
MATATILLA HEP UPJVNL HYDRO-HYDRO 3060 12219 6500
OBRA HEP UPJVNL HYDRO-HYDRO 9900 21517 6300
RIHAND UPJVNL HYDRO-HYDRO 30000 57369 5500
ANPARA A TPS UPRVUNL THERMAL-COAL 63000 317536 27000
ANPARA B TPS UPRVUNL THERMAL-COAL 100000 705605 22700
ANPARA D UPRVUNL THERMAL-COAL 100000 300158 39800
HARDUAGANJ TPS UPRVUNL THERMAL-COAL 16500 45817 49200
HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 50000 304389 46600
OBRA A TPS UPRVUNL THERMAL-COAL 28800 13158 34000
OBRA B TPS UPRVUNL THERMAL-COAL 100000 328124 21900
Page 34
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) PANKI TPS UPRVUNL THERMAL-COAL 21000 66488 50300
PARICHHA TPS UPRVUNL THERMAL-COAL 22000 38762 49400
PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 42000 231931 45600
PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 50000 276722 50400
CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 24000 70845 8290
CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 14400 75366 8390
DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 3375 9595 12080
DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 5100 18701 10520
KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4140 17359 12330
KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 12000 33001 9420
KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 3000 11953 8320
TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 9000 33983 12460
MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 30400 124510 16110
RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 19800 17897 10550
MPUR UTTARAKHAND JVNL HYDRO-HYDRO 930 5121 19200
PATHRI UTTARAKHAND JVNL HYDRO-HYDRO 2040 11636 14200
GALOGI UTTARAKHAND JVNL HYDRO-HYDRO 300 648 12500
PRIVATE SECTOR
MGTPP CLP INDIA PVT LTD THERMAL-COAL 132000 268902 41940
SHRINAGAR HEP ALAKNANDA HPCL HYDRO-HYDRO 33000 127414 48800
GAMA INFRAPROP CCPP GAMA INFRAPROP PVT THERMAL-GAS 22500 52686 47000
PPGCL (BARA) JP POWER VENTURES LTD THERMAL-COAL 198000 448200 38500
MALANA HEP MALANA PCL HYDRO-HYDRO 8600 26354 29792
MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 10000 30369 32580
ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 19200 56347 36079
KASHANG HEP H P PCL HYDRO-HYDRO 19500 5034 29200
BASPA-II HEP HBPCL HYDRO-HYDRO 30000 132769 13600
KARCHAM WANGTOO HEP HBPCL HYDRO-HYDRO 100000 434386 36600
RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 108000 582600 43700
RITHALA COMBI CY POWER PLANT TATA POWER DDL THERMAL-GAS 9480 000 11900
RAJPURA TPS NABHA POWER LTD THERMAL-GAS 140000 901484 39000
TALWANDI SABO POWER LTD TALWANDI SABO POWER LTD THERMAL-COAL 198000 636040 49548
ROJA THERMAL POWER STATION ROJA POWER SCL THERMAL-COAL 120000 727200 43400
KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 34400 63400
BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 36000 62600
MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 38200 60800
UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 37900 61500
KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 42300 58800
LALITPUR PGCL BAJAJ ENERGY PVT LTD THERMAL-COAL 198000 359400 47300
PRAYAGRAJ PGCL PRAYAGRAJ PGCL THERMAL-COAL 132000 448200 38595
KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 132000 783182 33438
WESTERN REGION
CENTRAL SECTOR
INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 100000 325333 23892
OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 52000 141663 34001
GANDHAR CCPP NTPC LTD THERMAL-GAS 65739 221924 28700
KAWAS CCPP NTPC LTD THERMAL-GASN 65620 167929 27000
KORBA I amp II NTPC LTD THERMAL-COAL 210000 1499171 20500
KORBA III NTPC LTD THERMAL-COAL 50000 358746 26600
SIPAT STPS I NTPC LTD THERMAL-COAL 198000 1479902 26800
SIPAT STPS II NTPC LTD THERMAL-COAL 100000 766549 26500
VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 126000 693142 25800
VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 100000 608781 23800
VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 100000 673475 27600
VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 100000 655924 32900
VINDHYACHAL STPS V NTPC LTD THERMAL-COAL 50000 328265 31700
MOUDA I NTPC LTD THERMAL-COAL 100000 343130 44500
MOUDA Ii NTPC LTD THERMAL-COAL 66000 40637 39900
RATNAGIRI GAS amp POWER PVT LTD RGPPL THERMAL-GAS 196708 442485 47000
KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 000 24729
TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 32000 201227 10740
Page 35
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 365122 19069
TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 787444 29324
STATE SECTOR
GSEG-HAZIRA15610 MW GUJARAT S ENEGEN LTD THERMAL-GAS 15610 1805 28200
GSEG-HAZIRA35143 MW GUJARAT S ENEGEN LTD THERMAL-GAS 35130 22276 51300
GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 21978 51800
AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 13929 26100
KORBA TPS EAST CSPGCL THERMAL-COAL 44000 198673 33880
DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 365808 27570
KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 316500 30420
HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 532878 19410
CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 515 58300
MTTPS CHAMPA U-I CSPGCL THERMAL-COAL 50000 220376 39000
MTTPS CHAMPA U-II CSPGCL THERMAL-COAL 50000 23709 10000
SHP GANGREL CSPGCL HYDRO-HYDRO 1000 2350 36790
BANGO HEP CSPGCL HYDRO-HYDRO 12000 14662 8900
MHP KORBA WEST CSPGCL HYDRO-HYDRO 170 859 38190
SIKASAR HEP CSPGCL HYDRO-HYDRO 700 418 26870
DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8843 74500
DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 19446 51500
GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 66388 71600
GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127488 41300
KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 96072 43900
KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 29841 56400
SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 184966 58800
UKAI 1-5 GSECL THERMAL-COAL 85000 204891 46900
UKAI TPS 6 GSECL THERMAL-COAL 50000 284448 48200
WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 271999 58300
WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 82808 44100
KADANA HPS GSECL HYDRO-HYDRO 24200 34433 16800
UKAI HPS GSECL HYDRO-HYDRO 30500 40585 6100
TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 123000 11500
BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 8900 10900
BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 7200 27500
JHINNA HPS MPPGCL HYDRO-HYDRO 2000 9700 18500
RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 44300 3400
GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 17300 4600
SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 4100 16900
MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 14600 27000
PENCH HPS MPPGCL HYDRO-HYDRO 16000 23700 8100
RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 3000 16900
AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 134400 35100
SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 283800 38700
SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 344600 34300
SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 111600 61600
SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 211800 58000
SSTPS PH-I MPPGCL THERMAL-COAL 120000 233100 84300
BHUSAWAL TPS MSPGCL THERMAL-COAL 142000 566258 51100
CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1365682 33700
KHAPERKHEDA MSPGCL THERMAL-COAL 134000 706207 39100
KORADI TPS MSPGCL THERMAL-COAL 62000 443206 42000
NASIK TPS MSPGCL THERMAL-COAL 63000 297275 47000
PARLI TPS MSPGCL THERMAL-COAL 113000 175934 71600
PARAS MSPGCL THERMAL-COAL 50000 267931 38700
URAN CCPP MSPGCL THERMAL-GAS 67200 320330 30600
KOYANA MSPGCL HYDRO-HYDRO 195600 328155 13100
SMALL HYDRO POWER PLANTS MSPGCL HYDRO-HYDRO 45400 93062 30500
BHIRA MSPGCL HYDRO-HYDRO 8000 10046 8400
TILLARI MSPGCL HYDRO-HYDRO 8900 10584 3100
SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 233298 20500
SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 87633 20500
PRIVATE SECTOR
Page 36
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 81282 46750
JNSTPP(JAYPEE NIGRIE) JP POWER VENTURES LTD THERMAL-COAL 132000 726695 29310
MB POWER MB POWER THERMAL-COAL 120000 345632 38310
ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 754922 28671
ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 780761 23495
ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 198000 1263784 32090
ADANI POWER MAHARA ADANI POWER LTD THERMAL-COAL 330000 1666191 34124
AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 170065 36827
SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 252035 45129
ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 458551 36000
ESSAR POWER MP LTD ESSAR POWER MP LTD THERMAL-COAL 60000 243040 28600
VEDANTA LTD (P P -I) VEDANTA LTD THERMAL-GAS 3000 15044 24000
VEDANTA LTD (P P -II) VEDANTA LTD THERMAL-GAS 3000 21293 24000
PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 8234600 24000
165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 5850 64390
145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 68717 40349
SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 132655 28776
SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 144686 38567
MUNDRA UMPPCOASTAL GUJARAT POWER
LTD THERMAL-IMP COAL 400000 2530300
23900
LANCO AMARKANTAK TPP PATHADIH
U-ILANCO AMARKAN POWER LTD THERMAL-COAL 30000 195500
29200
LANCO AMARKANTAK TPP PATHADIH
U-IILANCO AMARKAN POWER LTD THERMAL-COAL 30000 206900
27600
BARADARHA TPS D B POWER LTD THERMAL-COAL 120000 677373 29200
JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 405000 28900
JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 453000 40500
DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 339437 40700
TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 293400 44000
TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 137200 37000
TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 174900 44000
BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 92900 14100
BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23700 34300
KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 27600 48300
CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2530300 23900
BHANDARDRA HEP -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 2475 54900
SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 161400 26500
SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 445000 39000
SOTHERN REGION
CENTRAL SECTOR
NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 325699 54820
NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 305532 39880
NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 998805 38510
NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 113016 54070
NEYVELI TAMILNADU POWER LTD JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 625274 42200
VALLUR TPS NTPC TECL THERMAL-COAL 150000 856438 42350
R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 1493 84300
RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1502919 29400
RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 341291 31800
SIMHADRI I NTPC LTD THERMAL-COAL 100000 688382 36800
SIMHADRI II NTPC LTD THERMAL-COAL 100000 663657 43400
KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 593110 31324
MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 291625 21764
KKNPP-1 amp 2 NPCIL NUCLEAR-NUCLEAR 200000 572609 40948
MINICOY LAKSHADEEP THERMAL-DIESEL 340 770 29600
KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1097 29600
AMINI LAKSHADEEP THERMAL-DIESEL 265 509 29600
ANDROTT LAKSHADEEP THERMAL-DIESEL 219 524 29600
KALPENI LAKSHADEEP THERMAL-DIESEL 175 356 29600
AGATTI LAKSHADEEP THERMAL-DIESEL 195 658 29600
KADMAT LAKSHADEEP THERMAL-DIESEL 190 414 29600
KILTAN LAKSHADEEP THERMAL-DIESEL 150 269 29600
CHETLET LAKSHADEEP THERMAL-DIESEL 100 139 29600
BITRA LAKSHADEEP THERMAL-DIESEL 043 024 29600
BANGARAM LAKSHADEEP THERMAL-DIESEL 018 009 29600
Page 37
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) STATE SECTOR
Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 721811 46500
Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 50000 336142 46500
RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 237358 46500
RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 239926 46500
RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 124500 46500
SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 62109 46500
UPPER SILERU APGENCO HYDRO-HYDRO 24000 33000 46500
LOWER SILERU APGENCO HYDRO-HYDRO 46000 81066 46500
DONKARAI APGENCO HYDRO-HYDRO 2500 6007 46500
PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 1262 46500
CHETTIPETA APGENCO HYDRO-HYDRO 100 214 46500
MUCHKUND APGENCO HYDRO-HYDRO 12000 37571 46500
NAGARJUNASAGAR RCPH APGENCO HYDRO-HYDRO 9000 606 46500
TUNGABHADRA HES amp HAMPI(AP
Share)
APGENCO HYDRO-HYDRO 7200 6100 46500
KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 352232 42600
KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 288131 32500
KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 319272 46500
RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 40073 44300
KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 308317 46000
KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 308963 51300
SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 61004 76600
NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 17960 75300
PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 20873 58300
POCHAMPAD-I TSPGENCO HYDRO-HYDRO 2700 5455 29800
POCHAMPAD-II TSPGENCO HYDRO-HYDRO 900 1932 40700
NIZAMSAGAR TSPGENCO HYDRO-HYDRO 1000 1126 53400
RAICHUR TPS 1 to 7 KPCL THERMAL-COAL 147000 890866 43800
RAICHUR TPS 8 KPCL THERMAL-COAL 25000 159523 48200
BELLARI TPS 1 KPCL THERMAL-COAL 50000 318679 51100
BELLARI TPS 2 KPCL THERMAL-COAL 50000 232347 55600
BELLARI TPS 3 KPCL THERMAL-COAL 70000 47565 34400
BHADRA PH KPCL HYDRO-HYDRO 3920 2369 45900
GERUSUPPA PH KPCL HYDRO-HYDRO 24000 26990 22000
GHAT PRABHA HEP KPCL HYDRO-HYDRO 3200 4777 25300
KADRA HPS KPCL HYDRO-HYDRO 15000 16889 26800
NAGJHARI KPCL HYDRO-HYDRO 90000 155159 9800
KODASALLI DPH KPCL HYDRO-HYDRO 12000 14854 19200
MUNIRA+MGH+SPH+SPH KPCL HYDRO-HYDRO 22640 48211 7900
SHARAVATHY HPS KPCL HYDRO-HYDRO 108550 276215 5400
ALMATTI DPH KPCL HYDRO-HYDRO 29000 39611 24600
VARAHI UGPH KPCL HYDRO-HYDRO 46000 71368 15600
IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 17196 15300
IDUKKI HPS KSEB HYDRO-HYDRO 78000 137905 15300
KAKKAD HPS KSEB HYDRO-HYDRO 5000 13063 15300
KALLADA HPS KSEB HYDRO-HYDRO 1500 4436 15300
KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 46544 15300
KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 635 15300
LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 30822 15300
MALANKARA HPS KSEB HYDRO-HYDRO 1050 2474 15300
MATTUPETTY KSEB HYDRO-HYDRO 200 230 15300
MALAMPUZHA KSEB HYDRO-HYDRO 250 063 15300
CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 864 15300
URUMI ST I amp II KSEB HYDRO-HYDRO 615 903 15300
LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 248 15300
NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7765 19625 15300
PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 16601 15300
PANNIAR HPS KSEB HYDRO-HYDRO 3240 6217 15300
PORINGALKUTHU KSEB HYDRO-HYDRO 3600 10052 15300
PORINGALKUTHU LBE KSEB HYDRO-HYDRO 1600 9438 15300
PEPPARA KSEB HYDRO-HYDRO 300 395 15300
POOZHITHODE KSEB HYDRO-HYDRO 480 1045 15300
Page 38
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) PEECHI KSEB HYDRO-HYDRO 125 040 15300
RANI-PERUNADU KSEB HYDRO-HYDRO 400 585 15300
SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 79783 15300
SENGULAM HPS KSEB HYDRO-HYDRO 5120 11558 15300
SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 16711 15300
VILANGAD KSEB HYDRO-HYDRO 750 1578 15300
BARAPOLE KSEB HYDRO-HYDRO 1500 1932 15300
VELLATHOOVAL KSEB HYDRO-HYDRO 360 305 15300
CHIM0NY KSEB HYDRO-HYDRO 250 156 15300
ADYANPARA KSEB HYDRO-HYDRO 350 501 15300
BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 554 15300
KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 3801 15300
KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 23132 32800
ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 14416 62280
METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 523970 62280
METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 321270 62280
NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 336575 62280
NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 591240 62280
TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 508966 62280
KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 30897 62280
VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 18720 90699 62280
KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 33593 62280
BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 1047 62280
PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 1250 62280
PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 330 62280
MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 4897 62280
MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 032 62280
KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15681 62280
KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 40608 62280
KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 21342 62280
KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 4717 62280
KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4322 62280
KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2399 62280
METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 4416 62280
METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 8035 62280
BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2187 62280
BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2359 62280
BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2511 62280
BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 1949 62280
BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 1819 62280
POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 172 62280
SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 241 62280
MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 026 62280
THIRUMOORTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 136 62280
PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 9309 62280
VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 353 62280
SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 4192 62280
PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 6571 62280
SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 1186 62280
SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6319 62280
ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 6122 62280
KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 28674 62280
SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 18381 62280
SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 4258 62280
KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 12680 62280
KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4201 62280
ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 000 62280
PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 19175 62280
AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 078 62280
BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 504 62280
BHAVANI KATTALAI (BKB)(IIIampIII BB I amp II)TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 5847 62280
PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 000 62280
Page 39
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) SRI DAMODARAM STPS APPDCL THERMAL-COAL 160000 808108 36300
PRIVATE SECTOR
KARUPPUR TANJORE LANCO TANJORE PCL THERMAL-GAS 12000 48096 28770
SIMHAPURI ENERGY LTD SIMHAPURI ENERGY LTD THERMAL-COAL 60000 143900 39100
JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 7111 45500
SBU 1 JSW ENERGY LTD
VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 26000 159100
43300
SBU 2 JSW ENERGY LTD
VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 60000 247900
42800
LANCO KPLLANCO KONDAPALLI POWER
LTDTHERMAL-GAS 36814 85060
25776
LANCO KPL STG -IILANCO KONDAPALLI POWER
LTDTHERMAL-GAS 36600 12979
46330
LANCO KPL STG -IIIALANCO KONDAPALLI POWER
LTDTHERMAL-GAS 37100 85710
46330
LANCO KPL STG -III BLANCO KONDAPALLI POWER
LTDTHERMAL-GAS 37100 43639
46330
HINDUJA NATIONAL PCL HINDUJA NATIONAL PCL THERMAL-COAL 104000 303000 38200
MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 121164 49940
UDUPI POWER COR LTD ADANI POWER LTD THERMAL-COAL 120000 754613 42500
SPECTRUM POWER GENERATION
LTD SPECTRUM PG LTD THERMAL-GASN 20525 9256812
34952
TAQA NEYVELI POWER COM PVT
LTD TAQA NEYVELI THERMAL-LIG 25000 5840
34500
ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 251000 51000
ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 207860 36800
GMR VEMAGIRI POWER GENERATION
LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 30117
46450
EASTERN REGION
CENTRAL SECTOR
MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 64675 53113
MTPS STAGE - II KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 39000 1432 69138
BOKARO `B` TPS DVC THERMAL-COAL 63000 145670 31539
MEJIA TPS U 1-3 DVC THERMAL-COAL 63000 348298 31552
MEJIA TPS U 4 DVC THERMAL-COAL 21000 116099 34997
MEJIA TPS U 5-6 DVC THERMAL-COAL 50000 276427 35976
MEJIA TPS U 7-8 DVC THERMAL-COAL 100000 552854 36991
DURGAPUR STEEL TPS DVC THERMAL-COAL 100000 665550 39323
DURGAPUR TPS DVC THERMAL-COAL 21000 59270 35416
RAGHUNATHPUR TPS DVC THERMAL-COAL 120000 201650 35326
MAITHON HYDEL STA DVC HYDRO-HYDRO 6320 12200 17984
CHANDRAPURA TPSU1-3 DVC THERMAL-COAL 42000 257610 35095
CHANDRAPURA TPSU7-8 DVC THERMAL-COAL 50000 306673 34987
KODERMA TPS DVC THERMAL-COAL 100000 380180 38131
PANCHET HPS DVC HYDRO-HYDRO 8000 13360 17984
TILLAYA HPS DVC HYDRO-HYDRO 400 1410 17984
RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34700 35400
TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 277300 23200
TLDP -III NHPC LTD HYDRO-HYDRO 13200 55400 62000
TLDP -IV NHPC LTD HYDRO-HYDRO 16000 60300 25600
FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 957219 33700
FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 308943 41000
BONGAINGAON TPS NTPC LTD THERMAL-COAL 25000 153663 58600
KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 542277 34200
KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 942591 34200
BARH-II NTPC LTD THERMAL-COAL 132000 728021 44500
TALCHER TPS NTPC LTD THERMAL-COAL 46000 335521 30100
TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 702319 25600
TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1436521 24700
STATE SECTOR
BTPS(RampM) BIHAR STATE PGCL THERMAL-COAL 22000 12142 39700
BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 98331 10602
HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 50593 9482
CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 19689 2605
RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 53192 6033
UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 147208 14637
Page 40
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 60353 4519
IB TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 288567 25000
J P H GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 210 038 61100
MEYONG CHU GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 400 1086 61100
TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 122667 38200
DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 214339 43321
KOLAGHAT THERMAL POWER
STATION
WEST BENGAL PDCL THERMAL-COAL 126000 538269 31603
BAKRESHWAR THERMAL POWER
PLANT
WEST BENGAL PDCL THERMAL-COAL 105000 634876 32154
BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 45000 166855 33299
SANTHALDIH THERMAL POWER
STATION
WEST BENGAL PDCL THERMAL-COAL 50000 336442 34932
SAGARDIGHI THERMAL POWER
PROJECT
WEST BENGAL PDCL THERMAL-COAL 160000 423121 34705
JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 20344 68900
RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 24559 68900
TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 4623 68900
PURULIA PUMPED STORAGE
PROJECT
WEST BENGAL SEDCL HYDRO-HYDRO 90000 108816 68900
MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2768 68900
PRIVATE SECTOR
CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 49474 20230
CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 555500 70200
HALDIA ENERGY HALDIA ENERGY LTD THERMAL-COAL 60000 371000 50400
DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3688 63400
KAMALANGA TPS GMR KAMALANGA ENERGY LTD THERMAL-COAL 105000547670
33300
ADHUNIK POWER U-1 ADHUNIK POWER THERMAL-COAL 27000 158 44060
ADHUNIK POWER U-2 ADHUNIK POWER THERMAL-COAL 27000 168 44250
VL-JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 332800 23622
JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 43000 45250
JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 71700 37030
JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 70700 35920
JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 71100 38870
JOJOBERA UNIT 5 TATA POWER COM LTD THERMAL-COAL 12000 79300 44560
JOJOBERA UNIT 6 TATA POWER COM LTD THERMAL-WHR 12000 83700 12840
IEL KALINGANAGAR U-I TATA POWER COM LTD THERMAL-WG 6750 33400 22500
IEL KALINGANAGAR U-II TATA POWER COM LTD THERMAL-WG 6750 34800 22500
MAITHON UNIT 1 amp 2 TATA POWER COM LTD THERMAL-COAL 105000 678000 36100
HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 27500 24340
HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 28400 24340
HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 15800 24310
NORTH EASTERN REGION
CENTRAL SECTOR
LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 74100 36600
AGARTALA GT NEEPCO THERMAL-GAS 13500 88611 27210
ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 153111 32310
DOYANG HEP NEEPCO HYDRO-HYDRO 7500 25598 49801
KOPILI HEP NEEPCO HYDRO-HYDRO 20000 98186 11491
KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 19582 20237
KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 10310 17968
RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 124093 22945
TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 10100 17344 39000
STATE SECTOR
HYDRO POWER (122 Stns) ITANAGAR GOVT OF ARUNACHAL
PRADESHHYDRO-HYDRO 6971 6217270
24600
KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39514 17337
LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 82327 36810
NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 33318 48290
MYNTRIANG SHEP ST II ASSAM POWER GENCO HYDRO-HYDRO 300 567 35776
LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 9130 49200
LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 012 49200
DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 022 49200
TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 000 49200
UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 4990 16000
UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 6476 37000
UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 16494 14600
UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 3600 9556 15000
SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 758 8000
MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44070 44800
KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 154 41400
TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 091 41400
MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 411 41400
MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 394 41400
KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 760 41400
SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 3264 41400
LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 044 41400
BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 18953 28000
ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 43585 28200
GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 4080 11100
Note
LIG Lignite N Naptha WHR Waste Heat Recovery
Page 41
(As on 30042019)
Coal Lignite Gas Diesel Total
State 501000 000 23540 000 524540 000 167360 5618 697518
Private 387388 000 381318 3680 772386 000 000 743342 1515728
Central 154683 12773 000 000 167456 12727 000 25000 205183
Sub-Total 1043071 12773 404858 3680 1464382 12727 167360 773960 2418429
State 558250 000 000 000 558250 000 247993 4122 810365
Private 83945 000 83182 000 167127 000 000 393644 560771
Central 180685 14927 000 000 195612 14873 000 1000 211485
Sub-Total 822880 14927 83182 000 920989 14873 247993 398766 1582621
State 502000 000 000 12792 514792 000 358660 19389 892841
Private 195850 000 000 2520 198370 000 000 1363591 1561961
Central 242780 40140 000 000 282920 69800 000 000 352720
Sub-Total 940630 40140 000 15312 996082 69800 358660 1382979 2807521
State 000 000 000 15996 15996 000 185650 17290 218936
Private 61500 000 17400 000 78900 000 000 19021 97921
Central 86142 28180 35958 000 150280 36200 000 5000 191480
Sub-Total 147642 28180 53358 15996 245176 36200 185650 41311 508337
State 432000 000 52408 000 484408 000 217820 12270 714498
Private 458767 25000 50310 21170 555247 000 000 1229228 1784475
Central 302532 136420 000 000 438952 144800 000 23190 606942
Sub-Total 1193299 161420 102718 21170 1478607 144800 217820 1264688 3105915
State 000 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 000 000 000
Central 000 10000 000 000 10000 000 000 000 10000
Sub-Total 000 10000 000 000 10000 000 000 000 10000
State 000 000 3250 000 3250 000 000 000 3250
Private 000 000 000 000 000 000 000 314 314
Central 14080 10760 000 000 24840 8600 000 000 33440
Sub-Total 14080 10760 3250 000 28090 8600 000 314 37004
142600 35800 000 000 178400 45000 000 000 223400
State 1993250 000 79198 28788 2101236 000 1177483 58688 3337407
Private 1187450 25000 532210 27370 1772030 000 000 3749140 5521170
Central 1123502 289000 35958 000 1448460 332000 000 54190 1834650
Grand Total 4304202 314000 647366 56158 5321726 332000 1177483 3862018 10693227
Kerala
Andhra Pradesh
Telangana
Karnataka
Total (Southern
Region)
Tamil Nadu
NLC
Puducherry
Central - Unallocated
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
SOUTHERN REGION
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
State Ownership Sector
Mode wise breakup
Grand TotalThermalNuclear Hydro
RES
(MNRE)
(As on 30042019)
Coal Lignite Gas Diesel Total
State 000 000 000 000 000 000 000 7070 7070
Private 28100 000 000 000 28100 000 000 25545 53645
Central 384933 000 000 000 384933 000 11000 000 395932
Sub-Total 413033 000 000 000 413033 000 11000 32615 456647
State 42000 000 000 000 42000 000 13000 405 55405
Private 73000 000 000 000 73000 000 000 3495 76495
Central 39374 000 000 000 39374 000 6100 000 45474
Sub-Total 154374 000 000 000 154374 000 19100 3900 177374
State 540000 000 10000 000 550000 000 98600 12195 660795
Private 243700 000 000 000 243700 000 000 35250 278950
Central 76077 000 000 000 76077 000 41000 000 117077
Sub-Total 859777 000 10000 000 869777 000 139600 47445 1056822
State 000 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 000 000 000
Central 698504 000 000 000 698504 000 18620 000 717124
Sub-Total 698504 000 000 000 698504 000 18620 000 717124
State 42000 000 000 000 42000 000 206192 2630 250822
Private 293900 000 000 000 293900 000 000 47346 341246
Central 163390 000 000 000 163390 000 8900 1000 173290
Sub-Total 499290 000 000 000 499290 000 215092 50976 765358
State 000 000 000 000 000 000 36000 5211 41211
Private 000 000 000 000 000 000 39900 001 39901
Central 8703 000 000 000 8703 000 6400 000 15103
Sub-Total 8703 000 000 000 8703 000 82300 5212 96215
112683 000 000 000 112683 000 8501 000 121184
State 624000 000 10000 000 634000 000 353792 27511 1015303
Private 638700 000 000 000 638700 000 39900 111637 790237
Central 1483664 000 000 000 1483664 000 100520 1000 1585184
Grand Total 2746364 000 10000 000 2756364 000 494212 140148 3390724
Total (Eastern
Region)
Bihar
Jharkhand
West Bengal
DVC
Odisha
Sikkim
Central - Unallocated
HydroOwnership Sector
Mode wise breakup
Grand TotalThermalNuclear
RES
(MNRE)
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
State
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
EASTERN REGION
(As on 30042019)
Coal Lignite Gas Diesel Total
State 000 000 32821 000 32821 000 10000 501 43322
Private 000 000 2450 000 2450 000 000 2650 5100
Central 40852 000 43556 000 84408 000 35708 2500 122616
Sub-Total 40852 000 78827 000 119679 000 45708 5651 171038
State 000 000 000 000 000 000 000 10711 10711
Private 000 000 000 000 000 000 000 2939 2939
Central 3705 000 4682 000 8387 000 11655 000 20042
Sub-Total 3705 000 4682 000 8387 000 11655 13650 33692
State 000 000 000 000 000 000 32200 3253 35453
Private 000 000 000 000 000 000 000 012 012
Central 4560 000 10969 000 15529 000 7227 000 22756
Sub-Total 4560 000 10969 000 15529 000 39427 3265 58221
State 000 000 16950 000 16950 000 000 1601 18551
Private 000 000 000 000 000 000 000 009 009
Central 5610 000 43695 000 49305 000 6849 500 56654
Sub-Total 5610 000 60645 000 66255 000 6849 2110 75214
State 000 000 000 3600 3600 000 000 545 4145
Private 000 000 000 000 000 000 000 344 344
Central 4710 000 7157 000 11867 000 9534 000 21401
Sub-Total 4710 000 7157 3600 15467 000 9534 889 25890
State 000 000 000 000 000 000 000 3067 3067
Private 000 000 000 000 000 000 000 100 100
Central 3210 000 4893 000 8103 000 5733 000 13836
Sub-Total 3210 000 4893 000 8103 000 5733 3167 17003
State 000 000 000 000 000 000 000 3647 3647
Private 000 000 000 000 000 000 000 050 050
Central 3105 000 4046 000 7151 000 9794 000 16945
Sub-Total 3105 000 4046 000 7151 000 9794 3697 20642
11250 000 6362 000 17612 000 14000 000 31612
State 000 000 49771 3600 53371 000 42200 23325 118895
Private 000 000 2450 000 2450 000 000 6104 8554
Central 77002 000 125360 000 202362 000 100500 3000 305862
Grand Total 77002 000 177581 3600 258183 000 142700 32429 433311
Assam
Arunachal Pradesh
Meghalaya
Tripura
Manipur
Nagaland
Mizoram
Central - Unallocated
Total (North-
Eastern Region)
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
NORTH-EASTERN REGION
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
State Ownership Sector
Mode wise breakup
Grand TotalThermalNuclear Hydro
RES
(MNRE)
(As on 30042019)
Coal Lignite Gas Diesel Total
State 000 000 000 4005 4005 000 000 525 4530
Private 000 000 000 000 000 000 000 663 663
Central 000 000 000 000 000 000 000 510 510
Sub-Total 000 000 000 4005 4005 000 000 1698 5703
State 000 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 000 075 075
Central 000 000 000 000 000 000 000 000 000
Sub-Total 000 000 000 000 000 000 000 075 075
State 000 000 000 4005 4005 000 000 525 4530
Private 000 000 000 000 000 000 000 738 738
Central 000 000 000 000 000 000 000 510 510
Grand Total 000 000 000 4005 4005 000 000 1773 5778
Andaman amp
Nicobar
Lakshadweep
Total (Islands)
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
ISLANDS
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
State Ownership Sector
Mode wise breakup
Grand TotalThermalNuclear Hydro
RES
(MNRE)
SrNo Contents Page
1 Executive summary of Target and Achievement of Transmission Lines during 2019-20
20(1)
2 List of Transmission Lines CommissionedReady for commissioning during Apr-2019 20(2)
Section C - Transmission Lines
1 Executive summary of Target and Achievement of Transmission Lines during 2019-20 As on 30-04-19
(All figures in circuit kms)
Ce
ntr
al S
ecto
r
Sta
te S
ecto
r
JV
Pri
va
te S
ecto
r
To
tal
Ce
ntr
al S
ecto
r
Sta
te S
ecto
r
JV
Pri
va
te S
ecto
r
To
tal
Ce
ntr
al S
ecto
r
Sta
te S
ecto
r
JV
Pri
va
te S
ecto
r
To
tal
Ce
ntr
al S
ecto
r
Sta
te S
ecto
r
JV
Pri
va
te S
ecto
r
To
tal
Ce
ntr
al S
ecto
r
Sta
te S
ecto
r
JV
Pri
va
te S
ecto
r
To
tal
Ce
ntr
al
Se
cto
r
Sta
te S
ec
tor
JV
Pri
va
te S
ec
tor
Gra
nd
To
tal
0 0 0 0 0 0 0 0 2727 958 2334 6019 2239 3416 1143 6798 781 10023 0 10804 5747 14397 3477 23621
Apr19 Programme 0 0 0 0 0 0 0 0 577 416 557 1550 60 890 203 1153 0 309 0 309 637 1615 760 3012
Achievement 0 0 0 0 0 0 0 0 53 0 0 53 0 20 0 20 0 401 0 401 53 421 0 474
Upto Apr-19 Programme 0 0 0 0 0 0 0 0 577 416 557 1550 60 890 203 1153 0 309 0 309 637 1615 760 3012
Achievement 0 0 0 0 0 0 0 0 53 0 0 53 0 20 0 20 0 401 0 401 53 421 0 474
20(1)
220 kV Grand Total 800 kV 500 kV
Programme 2019-20
Programme
Achievement
HVDC765 kV 400 kV
Line
1 2 3 4 5 6
1 400 Bhadla (PG) - Bhadla (RVPN) line DC PGCIL 53
53
2 400 LILO of one ckt Jhanor - Navsari at Vav Ss DC GETCO 20
3 220 Banda-Chitrakoot Line DC UPPTCL 226
4 220 Gorakhpur (PG)-Gola line DC UPPTCL 82
5 220 Hapur(765) - Faridnagar line SC UPPTCL 11
6 220 Kalikiri - Madanapalli line DC APTRANSCO 60
7 220LILO of Gr Noida -Noida Sec-129 at Noida
Sec-148DC UPPTCL 1
8 220LILO of one Ckt of Badshahpur Pali at Sec-
65 GurgaonDC HVPNL 3
9 220 Sultanpur-Sangipur LILO Section at Amethi DC UPPTCL 18
421
0
474
20(2)
Grand Total
2Transmission Lines (220 kV and above) CommissionedReady for commissioning During Apr-2019
Voltage
Level (kV)Name of Transmission Lines
Circuit
Type
Executing
Agency
CENTRAL SECTOR
Total of CENTRAL SECTOR
STATE SECTOR Sector
Total of STATE SECTOR
PRIVATE SECTOR
Total of PRIVATE SECTOR
SlNo
Length(CKm)
As on 30-04-19
SN Contents Page
1 Executive summary of Target and Achievement of Substations during 2019-20 21(1)
2Sub Stations (220 kV and above) commissionedready for commisssioning during Apr-
201921(2)
Section D - Sub Stations
1 Executive summary of Target and Achievement of Substations during 2019-2020 As on 30-04-19
(All figures in circuit MVA)
Ce
ntr
al S
ecto
r
Sta
te S
ecto
r
JV
Pri
va
te S
ecto
r
To
tal
Ce
ntr
al S
ecto
r
Sta
te S
ecto
r
JV
Pri
va
te S
ecto
r
To
tal
Ce
ntr
al S
ecto
r
Sta
te S
ecto
r
JV
Pri
va
te S
ecto
r
To
tal
Ce
ntr
al S
ecto
r
Sta
te S
ecto
r
JV
Pri
va
te S
ecto
r
To
tal
Ce
ntr
al S
ecto
r
Sta
te S
ecto
r
JV
Pri
va
te S
ecto
r
To
tal
Ce
ntr
al S
ec
tor
Sta
te S
ec
tor
JV
Pri
va
te S
ec
tor
Gra
nd
To
tal
3000 0 0 3000 0 0 0 0 18000 3000 6000 27000 5205 19665 4260 29130 800 21786 0 22586 27005 44451 10260 81716
Apr19 Programme 0 0 0 0 0 0 0 0 3000 0 3000 6000 0 1000 2000 3000 0 800 0 800 3000 1800 5000 9800
Achievement 0 0 0 0 0 0 0 0 500 0 0 500 815 1980 0 2795 0 1305 0 1305 1315 3285 0 4600
Upto Apr-19 Programme 0 0 0 0 0 0 0 0 3000 0 3000 6000 0 1000 2000 3000 0 800 0 800 3000 1800 5000 9800
Achievement 0 0 0 0 0 0 0 0 500 0 0 500 815 1980 0 2795 0 1305 0 1305 1315 3285 0 4600
21(1)
220 kV Grand Total 800 kV 500 kV
Programme 2019-20
Programme
Achievement
HVDC765 kV 400 kV
As on 30-04-19
Sl Voltage Ratio Capacity
No (kVkV) (MWMVA)
1 2 3 4 5
1 Bhadla SS (3x1500 3x500 MVA) 765400 PGCIL 500
2 Extn at Tumkur (Pavagada ) PS (2x500 MVA) 400220 PGCIL 500
3 Bongaigaon (2nd ICT) Ss 400220 PGCIL 315
Total of CENTRAL SECTOR 1315
4 Motiram Adda Gorakhpur (Aug) (Additional TF) 400220 UPPTCL 240
5 Muradnagar-II Ghaziabad (Aug) (Additional TF) 400220 UPPTCL 240
6 Noida Sec- 148 GBNagar (New) 400220 UPPTCL 5007 Sarnath Varanasi (Aug) TF- II (500-315) 400220 UPPTCL 1858 Sarojininagar Lucknow Aug) TF- II (500-315) 400220 UPPTCL 185
9 Unnao (Aug) TF-III 400220 UPPTCL 31510 Nawada SS 400220 HVPNL 31511 Kharepatan SS 22033 MSETCL 2512 Prathipadu SS 220132 APTRANSCO 10013 Pali Ss 22066 HVPNL 160
14 A-5 Faridabad Ss 22066 HVPNL 60
15 Rentachintala Ss Aug(3X100-2x100) 220132 APTRANSCO 10016 Amethi Ss 220132 UPPTCL 160
17 Gajokhar Varanasi (Aug) TF- II (160-100) 220132 UPPTCL 60
18 Gola Gorakhpur (New) 220132 UPPTCL 160
19 Khurja Bulandshahr (Aug) TF- II (200-160) 220132 UPPTCL 40
20 RC Green GB Nagar (Aug) TF-II (160-100) 220132 UPPTCL 60
21 Sikandrabad Bulandshahr (Aug) (Additional TF) 220132 UPPTCL 160
22 Sitapur (Aug) (Additional TF) 220132 UPPTCL 160
23 Sohawal Ayodhya (Aug) TF-II (160-100) 220132 UPPTCL 60
TOTAL STATE SECTOR 3285
GRAND TOTAL 4600
21(2)
CENTRAL SECTOR
STATE SECTOR
2Sub-Stations (220 kV and above) CommissionedReady for commissioning During Apr-2019
Name of Sub Stations Executing Agency
SN Contents Page
1 Electricity Generation (MU) Targets and Achievements for 2019-20 22
Section E - Electricity Generation
Programme Achievement Ach Programme Achievement Ach
Central Sector 37545100 3177900 3129530 9848 3177900 3129530 9848
State Sector 37498600 3322500 2950558 8881 3322500 2950558 8881
PvtIPP Sector 37346200 3236400 3195940 9875 3236400 3195940 9875
PvtUTL Sector 1823100 159300 165579 10394 159300 165579 10394
Total 114213000 9896100 9441607 9541 9896100 9441607 9541
Central Sector 5661700 386100 481390 12468 386100 481390 12468
State Sector 6680500 498200 536514 10769 498200 536514 10769
PvtIPP Sector 1206900 57300 80405 14032 57300 80405 14032
PvtUTL Sector 144100 12300 10930 8886 12300 10930 8886
Total 13693200 953900 1109239 11628 953900 1109239 11628
Central Sector 4472000 367300 317765 8651 367300 317765 8651
Total 4472000 367300 317765 8651 367300 317765 8651
Bhutan Import 621800 17500 24396 13941 17500 24396 13941
Central Sector 47678800 3931300 3928685 9993 3931300 3928685 9993
State Sector 44179100 3820700 3487072 9127 3820700 3487072 9127
Pvt Sector 40520300 3465300 3452854 9964 3465300 3452854 9964
Total 133000000 11234800 10893007 9696 11234800 10893007 9696
Provisional based on actual-cum-Assesment
Figs in MU
Cummulative
Achievement
Cummulative
Achievement
Mar-19 Mar-18 Upto Mar-2019 Upto Mar-2018
984785 869291 12675910 10183949
22
1 Electricity Generation (MU) Targets and Achievememts for 2019-20
All India Energy Generation During Apr-19 to Apr-19 (MU)
Target (2019-20)Apr-19 to Apr-19
Sector
Hydro
Thermal
Nuclear
Renewable Energy Generation
Achievement
Apr-2019
98961
95393673
112348
94416
11092
3178
108930
0
20000
40000
60000
80000
100000
120000
Thermal Hydro Nuclear Total
Programme
Achievement
SN Contents Page
1 Energy Power Supply Position (Provisional) for Apr-2019 and during Apr-19 to Apr-19 23
2 Peak Power Supply Position (Provisional) for Apr-2019 and during Apr-19 to Apr-19 24
3 Energy Power Supply Position (Revised) for Mar-2019 and during Apr-19 to Mar-19 25
4 Peak Power Supply Position (Revised) for Mar-2019 and during Apr-19 to Mar-19 26
5 Notified Power cuts Restrictions on Industries during Apr-2019 27
6 Power Supply to Agricultural Sector during Apr-2019 28
Section F - Power supply position
आकड़ मममलयन यननट नट Figures in MU net
ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied
कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )
चडीगढ़ Chandigarh 117 117 0 00 117 117 0 00
दिलली Delhi 2698 2698 1 00 2698 2698 1 00
हरियजणज Haryana 3773 3773 0 00 3773 3773 0 00
दहमजचल परिश Himachal Pradesh 777 777 0 00 777 777 0 00
रमम कशमीि Jammu amp Kashmir 1604 1296 308 192 1604 1296 308 192
परजब Punjab 3646 3646 0 00 3646 3646 0 00
िजरसथजन Rajasthan 6210 6208 2 00 6210 6208 2 00
उतति परिश Uttar Pradesh 10179 10148 32 03 10179 10148 32 03
उततिजखड Uttarakhand 1120 1120 0 00 1120 1120 0 00
उततरी कषतर Northern Region 30094 29786 308 10 30094 29786 308 10
छततीसगढ़ Chhattisgarh 2684 2676 8 03 2684 2676 8 03
गरिजत Gujarat 10718 10718 0 00 10718 10718 0 00
मधय परिश Madhya Pradesh 6006 6006 0 00 6006 6006 0 00
महजिजषटर Maharashtra 14308 14308 0 00 14308 14308 0 00
िमन औि दिउ Daman amp Diu 220 220 0 00 220 220 0 00
िजिि व नगि हवली Dadra amp Nagar Haveli 552 552 0 00 552 552 0 00
गोवज Goa 388 388 0 00 388 388 0 00
पशचिमी कषतर Western Region 34875 34868 8 00 34875 34868 8 00
आनधर परिश Andhra Pradesh 5708 5708 0 00 5708 5708 0 00
तलगजनज Telangana 5725 5725 0 00 5725 5725 0 00
कनजाटक Karnataka 7003 7003 0 00 7003 7003 0 00
किल Kerala 2402 2400 2 01 2402 2400 2 01
तममल नजड Tamil Nadu 10010 10010 0 00 10010 10010 0 00
पडचिी Puducherry 263 263 0 00 263 263 0 00
लकष-दवीप Lakshadweep 4 4 0 0 4 4 0 0
दकषकषणी कषतर Southern Region 31111 31109 2 00 31111 31109 2 00
बबहजि Bihar 2589 2589 0 00 2589 2589 0 00
िजमोिि घजटी ननगम DVC 1772 1772 0 00 1772 1772 0 00
झजिखणड Jharkhand 689 689 0 00 689 689 0 00
ओडडशज Odisha 2689 2689 1 00 2689 2689 1 00
पशशचम बगजल West Bengal 5075 5075 0 00 5075 5075 0 00
मसशककम Sikkim 37 37 0 00 37 37 0 00
अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 7 29 27 2 7
परवी कषतर Eastern Region 12851 12850 1 00 12851 12850 1 00
अरणजचल परिश Arunachal Pradesh 66 66 0 05 66 66 0 05
असम Assam 766 709 57 75 766 709 57 75
मणणपि Manipur 68 67 1 15 68 67 1 15
मघजलय Meghalaya 170 160 10 59 170 160 10 59
ममज़ोिम Mizoram 54 53 0 08 54 53 0 08
नजगजलड Nagaland 54 54 0 08 54 54 0 08
बिपिज Tripura 122 120 1 12 122 120 1 12
उततर-परवी कषतर North-Eastern Region 1300 1228 71 55 1300 1228 71 55
समपणण भारत All India 110231 109842 389 04 110231 109842 389 04
23
ऊरजा पनत ा म कमी ऊरजा पनत ा म कमीEnergy not Supplied
Excludes energy exported to Bangladesh
Energy not Supplied
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
ऊराण वरवदयत आपरत ण शथिरत ररपोरण (परवाणरवलोकन) Energy Power Supply Position Report (Provisional)
राजयState
अपरल 2019 April2019 अपरल2019 -अपरल2019 April2019 to April2019
अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met
कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )
चडीगढ़ Chandigarh 256 256 0 00 256 256 0 00
दिलली Delhi 5664 5664 0 00 5664 5664 0 00
हरियजणज Haryana 8127 8127 0 00 8127 8127 0 00
दहमजचल परिश Himachal Pradesh 1387 1387 0 00 1387 1387 0 00
रमम कशमीि Jammu amp Kashmir 2826 2261 565 200 2826 2261 565 200
परजब Punjab 7015 7015 0 00 7015 7015 0 00
िजरसथजन Rajasthan 10560 10560 0 00 10560 10560 0 00
उतति परिश Uttar Pradesh 19935 19935 0 00 19935 19935 0 00
उततिजखड Uttarakhand 1922 1922 0 00 1922 1922 0 00
उततरी कषतर Northern Region 54476 53985 491 09 54476 53985 491 09
छततीसगढ़ Chhattisgarh 4596 4574 22 05 4596 4574 22 05
गरिजत Gujarat 17871 17865 6 00 17871 17865 6 00
मधय परिश Madhya Pradesh 10018 10018 0 00 10018 10018 0 00
महजिजषटर Maharashtra 23158 23150 8 00 23158 23150 8 00
िमन औि दिउ Daman amp Diu 341 340 1 02 341 340 1 02
िजिि व नगि हवली Dadra amp Nagar Haveli 818 818 0 00 818 818 0 00
गोवज Goa 594 594 0 00 594 594 0 00
पशचिमी कषतर Western Region 56242 56222 20 00 56242 56222 20 00
आनधर परिश Andhra Pradesh 9151 9151 0 00 9151 9151 0 00
तलगजनज Telangana 10191 10191 0 00 10191 10191 0 00
कनजाटक Karnataka 12681 12681 0 00 12681 12681 0 00
किल Kerala 4309 4300 8 02 4309 4300 8 02
तममल नजड Tamil Nadu 15972 15972 0 00 15972 15972 0 00
पडचिी Puducherry 482 480 2 05 482 480 2 05
लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0
दकषकषणी कषतर Southern Region 49155 49103 52 01 49155 49103 52 01
बबहजि Bihar 5357 5357 0 00 5357 5357 0 00
िजमोिि घजटी ननगम DVC 3039 3039 0 00 3039 3039 0 00
झजिखणड Jharkhand 1266 1266 0 00 1266 1266 0 00
ओडडशज Odisha 5389 5389 0 00 5389 5389 0 00
पशशचम बगजल West Bengal 8666 8666 0 00 8666 8666 0 00
मसशककम Sikkim 100 100 0 00 100 100 0 00
अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7
परवी कषतर Eastern Region 23349 23349 0 00 23349 23349 0 00
अरणजचल परिश Arunachal Pradesh 139 136 3 22 139 136 3 22
असम Assam 1712 1667 45 26 1712 1667 45 26
मणणपि Manipur 197 188 9 46 197 188 9 46
मघजलय Meghalaya 336 336 0 00 336 336 0 00
ममज़ोिम Mizoram 116 113 3 26 116 113 3 26
नजगजलड Nagaland 157 131 26 166 157 131 26 166
बिपिज Tripura 292 291 1 03 292 291 1 03
उततर-परवी कषतर North-Eastern Region 2848 2780 68 24 2848 2780 68 24
समपणण भारत All India 177411 176810 601 03 177411 176810 601 03
24
मजग की पनत ा म कमी Demand not Met
Excludes the supply to Bangladesh
राजयStateअपरल 2019 April2019
मजग की पनत ा म कमी Demand not Met
अधिकतम वरवदयत आपरत ण शथिरत ररपोरण (परवाणरवलोकन) Peak Power Supply Position Report (Provisional)
आकड़ मगज वजट नट Figures in MW netअपरल2019 -अपरल2019 April2019 to April2019
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
आकड़ मममलयन यननट नट Figures in MU net
ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied
कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )
चडीगढ़ Chandigarh 96 96 0 00 1561 1561 0 00
दिलली Delhi 1931 1930 1 00 32299 32282 17 01
हरियजणज Haryana 3658 3658 0 00 53665 53665 0 00
दहमजचल परिश Himachal Pradesh 832 830 2 02 9850 9618 232 24
रमम कशमीि Jammu amp Kashmir 1767 1414 353 200 19593 15868 3725 190
परजब Punjab 3585 3585 0 00 55288 55275 13 00
िजरसथजन Rajasthan 6774 6770 4 01 79826 79637 189 02
उतति परिश Uttar Pradesh 8754 8691 63 07 117101 116118 984 08
उततिजखड Uttarakhand 1067 1067 0 00 13845 13753 92 07
उततरी कषतर Northern Region 28464 28041 423 15 383028 377776 5251 14
छततीसगढ़ Chhattisgarh 2464 2457 8 03 26130 26076 54 02
गरिजत Gujarat 9890 9890 0 00 116588 116572 15 00
मधय परिश Madhya Pradesh 6236 6236 0 00 75667 75665 2 00
महजिजषटर Maharashtra 13631 13631 0 00 158285 158148 137 01
िमन औि दिउ Daman amp Diu 221 221 0 00 2557 2557 0 00
िजिि व नगि हवली Dadra amp Nagar Haveli 553 553 0 00 6317 6317 0 00
गोवज Goa 362 362 0 00 4283 4280 3 01
पशचिमी कषतर Western Region 33357 33349 8 00 389827 389615 212 01
आनधर परिश Andhra Pradesh 6072 6071 1 00 63735 63677 58 01
तलगजनज Telangana 6930 6929 1 00 66697 66635 62 01
कनजाटक Karnataka 7614 7612 1 00 71759 71690 69 01
किल Kerala 2489 2488 1 00 25029 24911 118 05
तममल नजड Tamil Nadu 10247 10245 2 00 109375 109273 102 01
पडचिी Puducherry 252 251 1 04 2761 2751 10 03
लकष-दवीप Lakshadweep 4 4 0 0 46 46 0 0
दकषकषणी कषतर Southern Region 33605 33597 8 00 339355 338938 417 01
बबहजि Bihar 2319 2318 1 00 30052 29827 225 07
िजमोिि घजटी ननगम DVC 1773 1772 1 00 22365 21995 369 17
झजिखणड Jharkhand 698 697 1 01 8682 8461 221 25
ओडडशज Odisha 2583 2582 1 00 31810 31781 30 01
पशशचम बगजल West Bengal 4585 4584 2 00 52237 52078 159 03
मसशककम Sikkim 41 41 0 00 513 512 0 01
अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 67 346 323 23 67
परवी कषतर Eastern Region 11999 11995 5 00 145658 144654 1004 07
अरणजचल परिश Arunachal Pradesh 61 60 0 06 864 855 9 10
असम Assam 680 656 23 34 9532 9204 328 34
मणणपि Manipur 68 68 1 09 916 906 10 11
मघजलय Meghalaya 173 173 0 03 1955 1953 1 01
ममज़ोिम Mizoram 50 49 0 09 668 661 8 12
नजगजलड Nagaland 58 57 1 20 902 809 93 103
बिपिज Tripura 150 150 0 00 1859 1837 21 11
उततर-परवी कषतर North-Eastern Region 1240 1214 26 21 16696 16225 471 28
समपणण भारत All India 108665 108196 469 04 1274564 1267209 7355 06
Note The revised data for March 2019 is not avaliable
Excludes energy exported to Bangladesh
राजयState
ऊराण वरवदयत आपरत ण शथिरत ररपोरण (परवाणरवलोकन) Energy Power Supply Position Report (Provisional)
25
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
Energy not Supplied Energy not Supplied
मािण2019 March2019 अपरल2018 -मािण2019 April2018 to March2019
ऊरजा पनत ा म कमी ऊरजा पनत ा म कमी
अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met
कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )
चडीगढ़ Chandigarh 223 223 0 00 369 369 0 00
दिलली Delhi 4016 4016 0 00 7016 7016 0 00
हरियजणज Haryana 6544 6544 0 00 10270 10270 0 00
दहमजचल परिश Himachal Pradesh 1683 1683 0 00 1700 1700 0 00
रमम कशमीि Jammu amp Kashmir 3277 2622 655 200 3277 2622 655 200
परजब Punjab 6564 6564 0 00 12638 12638 0 00
िजरसथजन Rajasthan 11885 11885 0 00 13276 13276 0 00
उतति परिश Uttar Pradesh 16220 16220 0 00 20498 20062 436 21
उततिजखड Uttarakhand 2002 2002 0 00 2216 2216 0 00
उततरी कषतर Northern Region 47925 47356 569 12 63166 61726 1440 23
छततीसगढ़ Chhattisgarh 4444 4128 316 71 4444 4270 174 39
गरिजत Gujarat 16263 16263 0 00 17053 16963 90 05
मधय परिश Madhya Pradesh 12328 12323 5 00 13815 13815 0 00
महजिजषटर Maharashtra 22361 22291 70 03 23864 23254 610 26
िमन औि दिउ Daman amp Diu 336 336 0 01 357 356 1 02
िजिि व नगि हवली Dadra amp Nagar Haveli 800 799 1 01 816 815 1 01
गोवज Goa 538 538 0 00 596 596 0 00
पशचिमी कषतर Western Region 53132 52965 167 03 56675 55821 853 15
आनधर परिश Andhra Pradesh 8977 8977 0 00 9459 9453 6 01
तलगजनज Telangana 10471 10471 0 00 10815 10815 0 00
कनजाटक Karnataka 12841 12841 0 00 12841 12841 0 00
किल Kerala 4264 4228 36 09 4264 4228 36 09
तममल नजड Tamil Nadu 15712 15712 0 00 15712 15712 0 00
पडचिी Puducherry 427 412 15 34 427 412 15 34
लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0
दकषकषणी कषतर Southern Region 49464 49464 0 00 49464 49464 0 00
बबहजि Bihar 4633 4633 0 00 5115 5084 31 06
िजमोिि घजटी ननगम DVC 3035 3035 0 00 3035 3035 0 00
झजिखणड Jharkhand 1210 1210 0 00 1339 1291 48 36
ओडडशज Odisha 4827 4827 0 00 5357 5357 0 00
पशशचम बगजल West Bengal 8287 8287 0 00 9130 9123 7 01
मसशककम Sikkim 100 100 0 00 106 106 0 00
अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7
परवी कषतर Eastern Region 21658 21658 0 00 23141 22733 408 18
अरणजचल परिश Arunachal Pradesh 133 131 2 15 138 138 0 01
असम Assam 1539 1508 31 20 1865 1809 56 30
मणणपि Manipur 204 199 5 25 219 216 3 12
मघजलय Meghalaya 357 357 0 00 374 372 1 04
ममज़ोिम Mizoram 108 105 3 28 121 119 2 17
नजगजलड Nagaland 127 125 2 16 156 138 18 116
बिपिज Tripura 249 249 0 00 298 293 5 17
उततर-परवी कषतर North-Eastern Region 2540 2535 5 02 2967 2850 117 39
समपणण भारत All India 169464 168745 719 04 177022 175528 1494 08
Note The revised data for March 2019 is not avaliable 26
अधिकतम वरवदयत आपरत ण शथिरत ररपोरण (परवाणरवलोकन) Peak Power Supply Position Report (Provisional)
आकड़ मगज वजट नट Figures in MW net
राजयStateमािण2019 March2019 अपरल2018 -मािण2019 April2018 to March2019
मजग की पनत ा म कमी मजग की पनत ा म कमी Demand not MetDemand not Met
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
Excludes the supply to Bangladesh
अपरल 2019 April2019 अपरल2018 -मािण2019 April2019 to April2019
उततरी कषतर Northern Region
चडीगढ़ Chandigarh(Data Not Received)दिलली Delhi
हरियजणज Haryana
दहमजचल परिश Himachal Pradeshरमम कशमीि Jammu amp Kashmir(Data
Not Received)परजब Punjab
िजरसथजन Rajasthanउतति परिश Uttar Pradesh
उततिजखड Uttarakhand
पशचिमी कषतर Western Region
छततीसगढ़ Chhattisgarh
Apr-Nov 2018- No cuts
Maximum Demand cut-58MW
Energy cut- 00020-00032 MUsday
गरिजत Gujarat
मधय परिश Madhya Pradesh
महजिजषटर Maharashtra
गोवज Goa
दकषकषणी कषतर Southern Region
आनधर परिश Andhra Pradesh
तलगजनज Telangana
कनजाटक Karnataka
किल Kerala
तममल नजड Tamil Nadu
पडचिी Puducherryपरवी कषतर Eastern Region
बबहजि Bihar
झजिखणड Jharkhand
ओडडशज Odisha
पशशचम बगजल West Bengal
No N
otifie
d Cu
ts
27
मािण 2019 म इडथरीर पर वरवदयत करौती का वरवरवरण Notified Power CutsRestrictions on Industries during April2019
राजय कषतर State Regionऊराणमाग करौती EnergyDemand Cut
No N
otifie
d Cu
tsNo
Notifie
d Cu
ts
अपरल2019 April 2019 अपरल2019 -अपरल2019 April2019 to April2019
उततरी कषतर Northern Region
चडीगढ़ Chandigarh Data not received Data not received
दिलली Delhi Data not received Data not received
हरियजणज Haryana 0811 hrsday 0811 hrsday
दहमजचल परिश Himachal Pradesh HPSEBL has only 2 agriculture consumers and uninterrupted
power is being supplied to agriculture sector
HPSEBL has only 2 agriculture consumers and uninterrupted
power is being supplied to agriculture sector
रमम कशमीि Jammu amp Kashmir Data not received Data not received
परजब Punjab 379 hrsday 379 hrsday
िजरसथजन Rajasthan 0630 hrsday 0630 hrsday
उतति परिश Uttar Pradesh 2157 hrsday 2157 hrsday
उततिजखड Uttarakhand 2359 hrsday 2359 hrsday
पशचिमी कषतर Western Region
छततीसगढ़ Chhattisgarh 18 hrsday 18 hrsday
गरिजत Gujarat 8 hrsday 8 hrsday
मधय परिश Madhya Pradesh Three-Phase Supply(Irrigation)- 0953 hrs day Three-Phase
(Mixed) Supply - 2334 hrs day
Three-Phase Supply(Irrigation)- 0953 hrs day Three-Phase
(Mixed) Supply - 2334 hrs day
महजिजषटर Maharashtra Three-Phase Supply(Irrigation)- 9 hrs day Three-Phase Supply(Irrigation)- 9 hrs day
गोवज Goa No restriction No restriction
दकषकषणी कषतर Southern Region
आनधर परिश Andhra Pradesh 07 hrsday 07 hrsday
तलगजनज Telangana 24 hrsday 24 hrsday
कनजाटक Karnataka 6 hrsday 6 hrsday
किल Kerala No Restrictions No Restrictions
तममल नजड Tamil Nadu 9 hrsday (6 hrs during day time and 3 hrs during night time) 9 hrsday (6 hrs during day time and 3 hrs during night time)
पडचिी Puducherry No Restrictions No Restrictions
परवी कषतर Eastern Region
बबहजि Bihar 18 hrsday 18 hrsday
झजिखणड Jharkhand 20 hrsday 20 hrsday
ओडडशज Odisha 24 hrsday 24 hrsday
पशशचम बगजल West Bengal 23 hrsday 23 hrsday
28
मारच 2019 कषि कषतर को षिदयत आपरतच का षििरण Power Supply to Agricultural Sector during March2019
राजय कषतर State Regionऔसत वरवदयत आपरत ण घनरो म Average Hours of Supply
On segregated feeders
SNo Contents Page
1 Growth of Installed Capacity since 6th Plan 29
2 Progress of Transmission Sector since 6th Plan 30
3 All India Yearly Coal consumption for Power Generation (Utilities)
4 All India Annual Per Capita Consumption of Electricity since -2006
5 Average cost of power supply amp Average realisation (Paisakwh)
6 Growth of Rural Electrification amp Pump Sets Energisation
7 Status of Hydro Schemes Cleared by the CEA in Apr-2019
Section G - Growth of Power Sector
31
32
(In MW)
Coal Gas Diesel Total
End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472
End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634
End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537
End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596
End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921
End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703
End of 12th Plan 19216288 2532938 83763 21832988 6780 4447842 50018 31960630
Up to Apr-2019 20070450 2493722 63763 22627934 678000 4539922 7764163 35610019
Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-17) = 51529 MW
Electricity Generation (MU) Targets and Achievements for 2016-17
Coal Gas Diesel Nuclear Hydro Res Total
2007045 2493722 637629 678000 453992 77641625 22925174
29
1 Growth of Installed Capacity Since 6th Plan
Plan YearThermal
Nuclear Hydro RES (MNRE) Total
2007045
2493722637629
678000
4539922
77641625
Total Installed Capacity 35610019 MW
Coal Gas Diesel Nuclear Hydro Res
Progress of Transmission Sector in the Country up to April 2019
1 TRANSMISSION LINES (All fig in CKM)
At the end of
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
6th plan 0 0 0 0 0 0 0 0 0 0 0 0 1831 4198 0 6029 1641 44364 0 46005 3472 48562 0 52034
7th plan 0 0 0 0 0 0 0 0 0 0 0 0 13068 6756 0 19824 4560 55071 0 59631 17628 61827 0 79455
8th plan 0 0 0 0 1634 0 0 1634 0 0 0 0 23001 13141 0 36142 6564 73036 0 79600 31199 86177 0 117376
9th plan 0 0 0 0 3234 1504 0 4738 751 409 0 1160 29345 20033 0 49378 8687 88306 0 96993 42017 110252 0 152269
10th plan 0 0 0 0 4368 1504 0 5872 1775 409 0 2184 48708 24730 0 73438 9444 105185 0 114629 64295 131828 0 196123
11th Plan 0 0 0 0 5948 1504 1980 9432 4839 411 0 5250 71023 30191 5605 106819 10140 125010 830 135980 91950 157116 8415 257481
12th Plan 6124 0 0 6124 5948 1504 1980 9432 25465 1177 4598 31240 92482 48240 17065 157787 11014 151276 978 163268 141033 202197 24621 367851
13th Plan (Up
to Mar2019)6124 0 0 6124 5948 1504 1980 9432 33692 1512 6605 41809 101335 58238 21173 180746 11734 162552 1010 175296 158833 223806 30768 413407
13th Plan (Up
to Apr-19)6124 0 0 6124 5948 1504 1980 9432 33745 1512 6605 41862 101335 58258 21173 180766 11734 162953 1010 175697 158886 224227 30768 413881
27150 600 MW of 132 kV Inter-Regional power transmission capacity links which are operated radially from time to time is not added in the total
75050
47900
24000
99050
30
Grand Total
Note - The figure upto the end of 10th plan in for stringing progress including the lines not commissioned Now only commissioned lines are reckoned Accordingly the figure for 10th plan (end) may read
as 187555 after adjusting with (-) 10852 Ckm
Inter-regional Power Transfer Capacity (MW)
plusmn 800 kV HVDC plusmn 500 kV HVDC 765 kV 400 kV 220 kV
IR addition in 12th
Plan (up to March
2017)
Inter-regional
Transmission
Capacity at the end
of Plan Period 2017-
22 (as on April19)
IR at the end of 11th
PlanIR at the end of 12th
Plan
IR Capacity Addition
at the end of Plan
Period 2017-22 (Till
April 19)
2004-05 27800
2005-06 28100
2006-07 30200
2007-08 33000
2008-09 35500
2009-10 36700
2010-11 38700
2011-12 41756
2012-13 45460
2013-14 48940
2014-15 53040
2015-16 54590
2016-17 57430
2017-18 60800
2018-19 62890
Year
2005-06
2006-07
2007-08
2008-09
2009-10
2010-11
2011-12
2012-13
2013-14
2014-15
2015-16
2016-17
2017-18
2018-19
2004-05 254 209 7568
2005-06 260 221 7636
2006-07 276 227 7423
2007-08 293 239 7727
2008-09 340 263 8713
2009-10 355 268 8870
2010-11 398 303 11975
2011-12 455 330 13514
2012-13 501 376 14867
2013-14 518 175
2014-15 520
Source- PFC Reports on the performance of State Power Utilities 31
1181
7335
7786
91441
8188
88363
957
1010
1075
1122
1149
(GrossGen+ Net Import) Mid-year population Provisional
5 Average cost of power supply amp average realization ( paiseKWH )
Yearcost of supply
(paiseunit)
Realization(paiseunit)
Including AgricultureOnly
Agriculture
6719
7171
3 All India yearly Coal Consumption for Power Generation (Utilities)
YEARCoal Consumption
Million Tonnes
4 All India Annual per Capita consumption of Electricity Since 2006
Per Capita Consumption ( kWh)
6314
Sl
NoExecuting Agency
Installed
Capacity (MW)Cost (Rs crore)
Date of
Clearance
32
Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as
Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received
from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made
available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified
villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is
independent of the earlier published reports
No Hydro Electric Project has been issued concurrenceAppraisal letter by CEA during April 2019
7 Status of Hydro Schemes Cleared by the CEA in Apr-2019
Name of Scheme
1999-002000-01
297594
010408 to 310309010409 to 310310
10th Plan
2005-062006-07
322968331020
6 Growth Of Rural Electrification amp Pumpsets Energisation
Plan Year
9th Plan2002-03
134092626
4111
Pump Sets Energised Villages Electricfied (Nos)
2001-02
284064367244
1218
27801997-981998-99
3207
482864
12632
1576036
4451722594
15455554
2314176
397343611750
2093311060316074
65109527813884
46708
18423975
499150
2003-042004-05
5743
9769
Cumu upto End of 10th Plan
010407 to 310308
010410 to 310311557976840909
010411 to 310312
412667
86293726
No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification
since 2004-05
65291374575 296361511th Plan
Cumu upto End of 11th Plan
596556 21212860
557439Cummulative up to end of 12th Plan
SN Contents Page
1 Rate of sale of power for the year 2016-17 33-41
RATE OF SALE OF POWER FOR THE YEAR 2016-17
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) NORTHERN REGION
CENTRAL SECTOR
BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 18000 66900 19800
CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 54000 222400 21600
CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 30000 144400 19600
CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 23100 91700 42600
PARBATI - III HPS NHPC LTD HYDRO-HYDRO 52000 68200 54800
DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 28000 95600 30000
CHUTAK NHPC LTD HYDRO-HYDRO 4400 22000 79800
DULHASTI HPS NHPC LTD HYDRO-HYDRO 39000 228000 56400
SALAL HPS NHPC LTD HYDRO-HYDRO 69000 342300 11000
TANAKPUR HPS NHPC LTD HYDRO-HYDRO 9420 43000 29600
URI HPS -I NHPC LTD HYDRO-HYDRO 48000 280300 16000
URI HPS - II NHPC LTD HYDRO-HYDRO 24000 147300 48600
NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 4500 24600 88200
SEWA - II NHPC LTD HYDRO-HYDRO 12000 47100 43400
ANTA CCPP NTPC LTD THERMAL-GASN 41930 67539 32400
AURAIYA CCPP NTPC LTD THERMAL-GASN 66336 53501 39100
BADARPUR TPS NTPC LTD THERMAL-COAL 70500 159153 44800
DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 84000 296170 42300
DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 98000 526686 46300
DADRI CCPP NTPC LTD THERMAL-GASHSD 82978 227469 33000
FARIDABAD CCPP NTPC LTD THERMAL-GASN 43159 115577 30800
RIHAND STPS I NTPC LTD THERMAL-COAL 100000 596766 24500
RIHAND STPS II NTPC LTD THERMAL-COAL 100000 737069 24600
RIHAND STPS III NTPC LTD THERMAL-COAL 100000 706546 30600
SINGRAULI STPS NTPC LTD THERMAL-COAL 200000 1394068 20400
TANDA TPS NTPC LTD THERMAL-COAL 44000 295438 40800
UNCHAHAR TPS I NTPC LTD THERMAL-COAL 42000 256454 39800
UNCHAHAR TPS II NTPC LTD THERMAL-COAL 42000 273577 38900
UNCHAHAR TPS III NTPC LTD THERMAL-COAL 21000 142780 43000
KOLDAM NTPC LTD HYDRO-HYDRO 80000 363260 43600
NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 303575 25841
RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 108000 668677 35374
NJHPS SJVNL HYDRO-HYDRO 150000 699496 23820
RAMPUR HPS SJVNL HYDRO-HYDRO 41202 195982 32260
TEHRI HPP THDC HYDRO-HYDRO 100000 272543 51800
KOTESHWAR HEP THDC HYDRO-HYDRO 40000 106244 53400
IGSTPS JHAJJAR ARAVALI P CPL THERMAL-COAL 150000 510429 49490
NEYVELI BARSINGSAR NEYVELI LIG CORP LTD THERMAL-LIG 25000 127520 38040
STATE SECTOR
PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 21000 14222 48200
PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 21000 19205 48400
PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 25000 102257 42600
PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 25000 62107 41800
DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 60000 312213 41000
RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 120000 35767442200
WYC HYDEL STATION HPGCL HYDRO-HYDRO 6240 20365 24900
GIRI POWER HOUSE HPSEB HYDRO-HYDRO 6000 13958 7600
ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 1695 5467 11900
BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 12000 18528 6700
GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 2250 7462 22500
BASSI POWER HOUSE HPSEB HYDRO-HYDRO 6600 29649 7500
BINWA POWER HOUSE HPSEB HYDRO-HYDRO 600 2749 19300
ANNEXURE-I
RATE OF SALE OF POWER FOR THE YEAR 2016-2017
Page 33
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) GAJ POWER HOUSE HPSEB HYDRO-HYDRO 1050 2914 26700
BANER POWER HOUSE HPSEB HYDRO-HYDRO 1200 2864 16200
HOLI POWER HOUSE HPSEB HYDRO-HYDRO 300 616 22500
THIROT POWER HOUSE HPSEB HYDRO-HYDRO 450 1126 22500
KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 1200 3064 22500
LARJI POWER HOUSE HPSEB HYDRO-HYDRO 12600 53677 23700
NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 250 750 31000
CHABA POWER HOUSE HPSEB HYDRO-HYDRO 175 465 23300
RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 150 101 13400
SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 200 000 22500
KILLAR HPSEB HYDRO-HYDRO 030 050 22500
BHABA AUGUMENP H HPSEB HYDRO-HYDRO 450 1276 22500
BS CHAMBA HPSEB HYDRO-HYDRO 045 099 19500
GUMMA HPSEB HYDRO-HYDRO 300 423 22500
GAS TURBINE POWER STATION IPGCL THERMAL-GAS 27000 67233 39300
PPS-I PPCL THERMAL-GAS 33000 175905 38300
PPS-III PPCL THERMAL-GAS 137120 196879 36100
LOWER JHELUM JampKPDD HYDRO-HYDRO 10500 60214 5100
UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 2260 10514 6300
UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 10500 44202 8500
GANDHARBAL JampKPDD HYDRO-HYDRO 1500 8925 4700
KARNAH MPH JampKPDD HYDRO-HYDRO 200 1122 31000
CHENANI I JampKPDD HYDRO-HYDRO 2330 10892 6600
CHENANI II JampKPDD HYDRO-HYDRO 200 1188 9300
CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 750 3634 14200
IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 375 2108 18500
IGO MERCHELLONG JampKPDD HYDRO-HYDRO 300 1572 29700
PAHALGAM MHP JampKPDD HYDRO-HYDRO 450 1713 32900
MARPACHOO JampKPDD HYDRO-HYDRO 075 375 29800
HAFTAL JampKPDD HYDRO-HYDRO 100 483 28700
SANJAK JampKPDD HYDRO-HYDRO 126 441 36000
SEWA-III JampKPDD HYDRO-HYDRO 900 3273 20200
BHADERWAH JampKPDD HYDRO-HYDRO 150 935 8900
BAZGO JampKPDD HYDRO-HYDRO 030 108 33300
SUMOOR JampKPDD HYDRO-HYDRO 010 045 35400
HUNDER JampKPDD HYDRO-HYDRO 040 176 26200
STAKNA JampKPDD HYDRO-HYDRO 400 1933 4100
KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 124000 662879 31360
SURATGARH TPS RRVUNL THERMAL-COAL 150000 402328 41730
CHHABRA TPS 1amp 2 RRVUNL THERMAL-COAL 50000 305946 36700
CHHABRA TPS 3 RRVUNL THERMAL-COAL 25000 151536 36700
CHHABRA TPS 4 RRVUNL THERMAL-COAL 25000 155896 36700
RAMGARH GT POWER PROJECT RRVUNL THERMAL-COAL 22050 43177 41800
RAMGARH GAS T P PROJECT 3 RRVUNL THERMAL-GAS 5000 93615 41800
DHOLPUR C C POWER PROJECT RRVUNL THERMAL-R-LNG 33000 9486 46110
MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 14000 20855 34192
MINI MICRO HYDEL (MMH) P S RRVUNL HYDRO-HYDRO 2385 851 37800
KALISINDH TPP 1 RRVUNL THERMAL-COAL 60000 341543 45000
KALISINDH TPP 2 RRVUNL THERMAL-COAL 60000 211588 45000
KHARA HEP UPJVNL HYDRO-HYDRO 7200 26654 7200
MATATILLA HEP UPJVNL HYDRO-HYDRO 3060 12219 6500
OBRA HEP UPJVNL HYDRO-HYDRO 9900 21517 6300
RIHAND UPJVNL HYDRO-HYDRO 30000 57369 5500
ANPARA A TPS UPRVUNL THERMAL-COAL 63000 317536 27000
ANPARA B TPS UPRVUNL THERMAL-COAL 100000 705605 22700
ANPARA D UPRVUNL THERMAL-COAL 100000 300158 39800
HARDUAGANJ TPS UPRVUNL THERMAL-COAL 16500 45817 49200
HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 50000 304389 46600
OBRA A TPS UPRVUNL THERMAL-COAL 28800 13158 34000
OBRA B TPS UPRVUNL THERMAL-COAL 100000 328124 21900
Page 34
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) PANKI TPS UPRVUNL THERMAL-COAL 21000 66488 50300
PARICHHA TPS UPRVUNL THERMAL-COAL 22000 38762 49400
PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 42000 231931 45600
PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 50000 276722 50400
CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 24000 70845 8290
CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 14400 75366 8390
DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 3375 9595 12080
DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 5100 18701 10520
KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4140 17359 12330
KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 12000 33001 9420
KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 3000 11953 8320
TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 9000 33983 12460
MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 30400 124510 16110
RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 19800 17897 10550
MPUR UTTARAKHAND JVNL HYDRO-HYDRO 930 5121 19200
PATHRI UTTARAKHAND JVNL HYDRO-HYDRO 2040 11636 14200
GALOGI UTTARAKHAND JVNL HYDRO-HYDRO 300 648 12500
PRIVATE SECTOR
MGTPP CLP INDIA PVT LTD THERMAL-COAL 132000 268902 41940
SHRINAGAR HEP ALAKNANDA HPCL HYDRO-HYDRO 33000 127414 48800
GAMA INFRAPROP CCPP GAMA INFRAPROP PVT THERMAL-GAS 22500 52686 47000
PPGCL (BARA) JP POWER VENTURES LTD THERMAL-COAL 198000 448200 38500
MALANA HEP MALANA PCL HYDRO-HYDRO 8600 26354 29792
MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 10000 30369 32580
ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 19200 56347 36079
KASHANG HEP H P PCL HYDRO-HYDRO 19500 5034 29200
BASPA-II HEP HBPCL HYDRO-HYDRO 30000 132769 13600
KARCHAM WANGTOO HEP HBPCL HYDRO-HYDRO 100000 434386 36600
RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 108000 582600 43700
RITHALA COMBI CY POWER PLANT TATA POWER DDL THERMAL-GAS 9480 000 11900
RAJPURA TPS NABHA POWER LTD THERMAL-GAS 140000 901484 39000
TALWANDI SABO POWER LTD TALWANDI SABO POWER LTD THERMAL-COAL 198000 636040 49548
ROJA THERMAL POWER STATION ROJA POWER SCL THERMAL-COAL 120000 727200 43400
KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 34400 63400
BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 36000 62600
MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 38200 60800
UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 37900 61500
KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 42300 58800
LALITPUR PGCL BAJAJ ENERGY PVT LTD THERMAL-COAL 198000 359400 47300
PRAYAGRAJ PGCL PRAYAGRAJ PGCL THERMAL-COAL 132000 448200 38595
KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 132000 783182 33438
WESTERN REGION
CENTRAL SECTOR
INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 100000 325333 23892
OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 52000 141663 34001
GANDHAR CCPP NTPC LTD THERMAL-GAS 65739 221924 28700
KAWAS CCPP NTPC LTD THERMAL-GASN 65620 167929 27000
KORBA I amp II NTPC LTD THERMAL-COAL 210000 1499171 20500
KORBA III NTPC LTD THERMAL-COAL 50000 358746 26600
SIPAT STPS I NTPC LTD THERMAL-COAL 198000 1479902 26800
SIPAT STPS II NTPC LTD THERMAL-COAL 100000 766549 26500
VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 126000 693142 25800
VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 100000 608781 23800
VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 100000 673475 27600
VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 100000 655924 32900
VINDHYACHAL STPS V NTPC LTD THERMAL-COAL 50000 328265 31700
MOUDA I NTPC LTD THERMAL-COAL 100000 343130 44500
MOUDA Ii NTPC LTD THERMAL-COAL 66000 40637 39900
RATNAGIRI GAS amp POWER PVT LTD RGPPL THERMAL-GAS 196708 442485 47000
KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 000 24729
TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 32000 201227 10740
Page 35
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 365122 19069
TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 787444 29324
STATE SECTOR
GSEG-HAZIRA15610 MW GUJARAT S ENEGEN LTD THERMAL-GAS 15610 1805 28200
GSEG-HAZIRA35143 MW GUJARAT S ENEGEN LTD THERMAL-GAS 35130 22276 51300
GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 21978 51800
AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 13929 26100
KORBA TPS EAST CSPGCL THERMAL-COAL 44000 198673 33880
DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 365808 27570
KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 316500 30420
HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 532878 19410
CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 515 58300
MTTPS CHAMPA U-I CSPGCL THERMAL-COAL 50000 220376 39000
MTTPS CHAMPA U-II CSPGCL THERMAL-COAL 50000 23709 10000
SHP GANGREL CSPGCL HYDRO-HYDRO 1000 2350 36790
BANGO HEP CSPGCL HYDRO-HYDRO 12000 14662 8900
MHP KORBA WEST CSPGCL HYDRO-HYDRO 170 859 38190
SIKASAR HEP CSPGCL HYDRO-HYDRO 700 418 26870
DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8843 74500
DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 19446 51500
GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 66388 71600
GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127488 41300
KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 96072 43900
KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 29841 56400
SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 184966 58800
UKAI 1-5 GSECL THERMAL-COAL 85000 204891 46900
UKAI TPS 6 GSECL THERMAL-COAL 50000 284448 48200
WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 271999 58300
WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 82808 44100
KADANA HPS GSECL HYDRO-HYDRO 24200 34433 16800
UKAI HPS GSECL HYDRO-HYDRO 30500 40585 6100
TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 123000 11500
BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 8900 10900
BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 7200 27500
JHINNA HPS MPPGCL HYDRO-HYDRO 2000 9700 18500
RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 44300 3400
GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 17300 4600
SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 4100 16900
MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 14600 27000
PENCH HPS MPPGCL HYDRO-HYDRO 16000 23700 8100
RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 3000 16900
AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 134400 35100
SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 283800 38700
SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 344600 34300
SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 111600 61600
SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 211800 58000
SSTPS PH-I MPPGCL THERMAL-COAL 120000 233100 84300
BHUSAWAL TPS MSPGCL THERMAL-COAL 142000 566258 51100
CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1365682 33700
KHAPERKHEDA MSPGCL THERMAL-COAL 134000 706207 39100
KORADI TPS MSPGCL THERMAL-COAL 62000 443206 42000
NASIK TPS MSPGCL THERMAL-COAL 63000 297275 47000
PARLI TPS MSPGCL THERMAL-COAL 113000 175934 71600
PARAS MSPGCL THERMAL-COAL 50000 267931 38700
URAN CCPP MSPGCL THERMAL-GAS 67200 320330 30600
KOYANA MSPGCL HYDRO-HYDRO 195600 328155 13100
SMALL HYDRO POWER PLANTS MSPGCL HYDRO-HYDRO 45400 93062 30500
BHIRA MSPGCL HYDRO-HYDRO 8000 10046 8400
TILLARI MSPGCL HYDRO-HYDRO 8900 10584 3100
SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 233298 20500
SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 87633 20500
PRIVATE SECTOR
Page 36
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 81282 46750
JNSTPP(JAYPEE NIGRIE) JP POWER VENTURES LTD THERMAL-COAL 132000 726695 29310
MB POWER MB POWER THERMAL-COAL 120000 345632 38310
ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 754922 28671
ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 780761 23495
ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 198000 1263784 32090
ADANI POWER MAHARA ADANI POWER LTD THERMAL-COAL 330000 1666191 34124
AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 170065 36827
SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 252035 45129
ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 458551 36000
ESSAR POWER MP LTD ESSAR POWER MP LTD THERMAL-COAL 60000 243040 28600
VEDANTA LTD (P P -I) VEDANTA LTD THERMAL-GAS 3000 15044 24000
VEDANTA LTD (P P -II) VEDANTA LTD THERMAL-GAS 3000 21293 24000
PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 8234600 24000
165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 5850 64390
145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 68717 40349
SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 132655 28776
SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 144686 38567
MUNDRA UMPPCOASTAL GUJARAT POWER
LTD THERMAL-IMP COAL 400000 2530300
23900
LANCO AMARKANTAK TPP PATHADIH
U-ILANCO AMARKAN POWER LTD THERMAL-COAL 30000 195500
29200
LANCO AMARKANTAK TPP PATHADIH
U-IILANCO AMARKAN POWER LTD THERMAL-COAL 30000 206900
27600
BARADARHA TPS D B POWER LTD THERMAL-COAL 120000 677373 29200
JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 405000 28900
JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 453000 40500
DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 339437 40700
TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 293400 44000
TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 137200 37000
TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 174900 44000
BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 92900 14100
BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23700 34300
KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 27600 48300
CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2530300 23900
BHANDARDRA HEP -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 2475 54900
SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 161400 26500
SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 445000 39000
SOTHERN REGION
CENTRAL SECTOR
NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 325699 54820
NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 305532 39880
NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 998805 38510
NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 113016 54070
NEYVELI TAMILNADU POWER LTD JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 625274 42200
VALLUR TPS NTPC TECL THERMAL-COAL 150000 856438 42350
R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 1493 84300
RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1502919 29400
RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 341291 31800
SIMHADRI I NTPC LTD THERMAL-COAL 100000 688382 36800
SIMHADRI II NTPC LTD THERMAL-COAL 100000 663657 43400
KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 593110 31324
MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 291625 21764
KKNPP-1 amp 2 NPCIL NUCLEAR-NUCLEAR 200000 572609 40948
MINICOY LAKSHADEEP THERMAL-DIESEL 340 770 29600
KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1097 29600
AMINI LAKSHADEEP THERMAL-DIESEL 265 509 29600
ANDROTT LAKSHADEEP THERMAL-DIESEL 219 524 29600
KALPENI LAKSHADEEP THERMAL-DIESEL 175 356 29600
AGATTI LAKSHADEEP THERMAL-DIESEL 195 658 29600
KADMAT LAKSHADEEP THERMAL-DIESEL 190 414 29600
KILTAN LAKSHADEEP THERMAL-DIESEL 150 269 29600
CHETLET LAKSHADEEP THERMAL-DIESEL 100 139 29600
BITRA LAKSHADEEP THERMAL-DIESEL 043 024 29600
BANGARAM LAKSHADEEP THERMAL-DIESEL 018 009 29600
Page 37
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) STATE SECTOR
Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 721811 46500
Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 50000 336142 46500
RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 237358 46500
RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 239926 46500
RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 124500 46500
SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 62109 46500
UPPER SILERU APGENCO HYDRO-HYDRO 24000 33000 46500
LOWER SILERU APGENCO HYDRO-HYDRO 46000 81066 46500
DONKARAI APGENCO HYDRO-HYDRO 2500 6007 46500
PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 1262 46500
CHETTIPETA APGENCO HYDRO-HYDRO 100 214 46500
MUCHKUND APGENCO HYDRO-HYDRO 12000 37571 46500
NAGARJUNASAGAR RCPH APGENCO HYDRO-HYDRO 9000 606 46500
TUNGABHADRA HES amp HAMPI(AP
Share)
APGENCO HYDRO-HYDRO 7200 6100 46500
KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 352232 42600
KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 288131 32500
KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 319272 46500
RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 40073 44300
KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 308317 46000
KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 308963 51300
SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 61004 76600
NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 17960 75300
PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 20873 58300
POCHAMPAD-I TSPGENCO HYDRO-HYDRO 2700 5455 29800
POCHAMPAD-II TSPGENCO HYDRO-HYDRO 900 1932 40700
NIZAMSAGAR TSPGENCO HYDRO-HYDRO 1000 1126 53400
RAICHUR TPS 1 to 7 KPCL THERMAL-COAL 147000 890866 43800
RAICHUR TPS 8 KPCL THERMAL-COAL 25000 159523 48200
BELLARI TPS 1 KPCL THERMAL-COAL 50000 318679 51100
BELLARI TPS 2 KPCL THERMAL-COAL 50000 232347 55600
BELLARI TPS 3 KPCL THERMAL-COAL 70000 47565 34400
BHADRA PH KPCL HYDRO-HYDRO 3920 2369 45900
GERUSUPPA PH KPCL HYDRO-HYDRO 24000 26990 22000
GHAT PRABHA HEP KPCL HYDRO-HYDRO 3200 4777 25300
KADRA HPS KPCL HYDRO-HYDRO 15000 16889 26800
NAGJHARI KPCL HYDRO-HYDRO 90000 155159 9800
KODASALLI DPH KPCL HYDRO-HYDRO 12000 14854 19200
MUNIRA+MGH+SPH+SPH KPCL HYDRO-HYDRO 22640 48211 7900
SHARAVATHY HPS KPCL HYDRO-HYDRO 108550 276215 5400
ALMATTI DPH KPCL HYDRO-HYDRO 29000 39611 24600
VARAHI UGPH KPCL HYDRO-HYDRO 46000 71368 15600
IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 17196 15300
IDUKKI HPS KSEB HYDRO-HYDRO 78000 137905 15300
KAKKAD HPS KSEB HYDRO-HYDRO 5000 13063 15300
KALLADA HPS KSEB HYDRO-HYDRO 1500 4436 15300
KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 46544 15300
KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 635 15300
LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 30822 15300
MALANKARA HPS KSEB HYDRO-HYDRO 1050 2474 15300
MATTUPETTY KSEB HYDRO-HYDRO 200 230 15300
MALAMPUZHA KSEB HYDRO-HYDRO 250 063 15300
CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 864 15300
URUMI ST I amp II KSEB HYDRO-HYDRO 615 903 15300
LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 248 15300
NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7765 19625 15300
PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 16601 15300
PANNIAR HPS KSEB HYDRO-HYDRO 3240 6217 15300
PORINGALKUTHU KSEB HYDRO-HYDRO 3600 10052 15300
PORINGALKUTHU LBE KSEB HYDRO-HYDRO 1600 9438 15300
PEPPARA KSEB HYDRO-HYDRO 300 395 15300
POOZHITHODE KSEB HYDRO-HYDRO 480 1045 15300
Page 38
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) PEECHI KSEB HYDRO-HYDRO 125 040 15300
RANI-PERUNADU KSEB HYDRO-HYDRO 400 585 15300
SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 79783 15300
SENGULAM HPS KSEB HYDRO-HYDRO 5120 11558 15300
SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 16711 15300
VILANGAD KSEB HYDRO-HYDRO 750 1578 15300
BARAPOLE KSEB HYDRO-HYDRO 1500 1932 15300
VELLATHOOVAL KSEB HYDRO-HYDRO 360 305 15300
CHIM0NY KSEB HYDRO-HYDRO 250 156 15300
ADYANPARA KSEB HYDRO-HYDRO 350 501 15300
BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 554 15300
KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 3801 15300
KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 23132 32800
ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 14416 62280
METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 523970 62280
METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 321270 62280
NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 336575 62280
NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 591240 62280
TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 508966 62280
KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 30897 62280
VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 18720 90699 62280
KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 33593 62280
BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 1047 62280
PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 1250 62280
PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 330 62280
MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 4897 62280
MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 032 62280
KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15681 62280
KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 40608 62280
KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 21342 62280
KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 4717 62280
KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4322 62280
KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2399 62280
METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 4416 62280
METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 8035 62280
BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2187 62280
BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2359 62280
BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2511 62280
BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 1949 62280
BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 1819 62280
POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 172 62280
SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 241 62280
MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 026 62280
THIRUMOORTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 136 62280
PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 9309 62280
VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 353 62280
SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 4192 62280
PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 6571 62280
SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 1186 62280
SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6319 62280
ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 6122 62280
KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 28674 62280
SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 18381 62280
SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 4258 62280
KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 12680 62280
KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4201 62280
ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 000 62280
PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 19175 62280
AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 078 62280
BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 504 62280
BHAVANI KATTALAI (BKB)(IIIampIII BB I amp II)TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 5847 62280
PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 000 62280
Page 39
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) SRI DAMODARAM STPS APPDCL THERMAL-COAL 160000 808108 36300
PRIVATE SECTOR
KARUPPUR TANJORE LANCO TANJORE PCL THERMAL-GAS 12000 48096 28770
SIMHAPURI ENERGY LTD SIMHAPURI ENERGY LTD THERMAL-COAL 60000 143900 39100
JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 7111 45500
SBU 1 JSW ENERGY LTD
VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 26000 159100
43300
SBU 2 JSW ENERGY LTD
VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 60000 247900
42800
LANCO KPLLANCO KONDAPALLI POWER
LTDTHERMAL-GAS 36814 85060
25776
LANCO KPL STG -IILANCO KONDAPALLI POWER
LTDTHERMAL-GAS 36600 12979
46330
LANCO KPL STG -IIIALANCO KONDAPALLI POWER
LTDTHERMAL-GAS 37100 85710
46330
LANCO KPL STG -III BLANCO KONDAPALLI POWER
LTDTHERMAL-GAS 37100 43639
46330
HINDUJA NATIONAL PCL HINDUJA NATIONAL PCL THERMAL-COAL 104000 303000 38200
MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 121164 49940
UDUPI POWER COR LTD ADANI POWER LTD THERMAL-COAL 120000 754613 42500
SPECTRUM POWER GENERATION
LTD SPECTRUM PG LTD THERMAL-GASN 20525 9256812
34952
TAQA NEYVELI POWER COM PVT
LTD TAQA NEYVELI THERMAL-LIG 25000 5840
34500
ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 251000 51000
ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 207860 36800
GMR VEMAGIRI POWER GENERATION
LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 30117
46450
EASTERN REGION
CENTRAL SECTOR
MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 64675 53113
MTPS STAGE - II KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 39000 1432 69138
BOKARO `B` TPS DVC THERMAL-COAL 63000 145670 31539
MEJIA TPS U 1-3 DVC THERMAL-COAL 63000 348298 31552
MEJIA TPS U 4 DVC THERMAL-COAL 21000 116099 34997
MEJIA TPS U 5-6 DVC THERMAL-COAL 50000 276427 35976
MEJIA TPS U 7-8 DVC THERMAL-COAL 100000 552854 36991
DURGAPUR STEEL TPS DVC THERMAL-COAL 100000 665550 39323
DURGAPUR TPS DVC THERMAL-COAL 21000 59270 35416
RAGHUNATHPUR TPS DVC THERMAL-COAL 120000 201650 35326
MAITHON HYDEL STA DVC HYDRO-HYDRO 6320 12200 17984
CHANDRAPURA TPSU1-3 DVC THERMAL-COAL 42000 257610 35095
CHANDRAPURA TPSU7-8 DVC THERMAL-COAL 50000 306673 34987
KODERMA TPS DVC THERMAL-COAL 100000 380180 38131
PANCHET HPS DVC HYDRO-HYDRO 8000 13360 17984
TILLAYA HPS DVC HYDRO-HYDRO 400 1410 17984
RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34700 35400
TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 277300 23200
TLDP -III NHPC LTD HYDRO-HYDRO 13200 55400 62000
TLDP -IV NHPC LTD HYDRO-HYDRO 16000 60300 25600
FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 957219 33700
FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 308943 41000
BONGAINGAON TPS NTPC LTD THERMAL-COAL 25000 153663 58600
KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 542277 34200
KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 942591 34200
BARH-II NTPC LTD THERMAL-COAL 132000 728021 44500
TALCHER TPS NTPC LTD THERMAL-COAL 46000 335521 30100
TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 702319 25600
TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1436521 24700
STATE SECTOR
BTPS(RampM) BIHAR STATE PGCL THERMAL-COAL 22000 12142 39700
BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 98331 10602
HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 50593 9482
CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 19689 2605
RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 53192 6033
UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 147208 14637
Page 40
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 60353 4519
IB TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 288567 25000
J P H GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 210 038 61100
MEYONG CHU GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 400 1086 61100
TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 122667 38200
DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 214339 43321
KOLAGHAT THERMAL POWER
STATION
WEST BENGAL PDCL THERMAL-COAL 126000 538269 31603
BAKRESHWAR THERMAL POWER
PLANT
WEST BENGAL PDCL THERMAL-COAL 105000 634876 32154
BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 45000 166855 33299
SANTHALDIH THERMAL POWER
STATION
WEST BENGAL PDCL THERMAL-COAL 50000 336442 34932
SAGARDIGHI THERMAL POWER
PROJECT
WEST BENGAL PDCL THERMAL-COAL 160000 423121 34705
JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 20344 68900
RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 24559 68900
TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 4623 68900
PURULIA PUMPED STORAGE
PROJECT
WEST BENGAL SEDCL HYDRO-HYDRO 90000 108816 68900
MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2768 68900
PRIVATE SECTOR
CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 49474 20230
CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 555500 70200
HALDIA ENERGY HALDIA ENERGY LTD THERMAL-COAL 60000 371000 50400
DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3688 63400
KAMALANGA TPS GMR KAMALANGA ENERGY LTD THERMAL-COAL 105000547670
33300
ADHUNIK POWER U-1 ADHUNIK POWER THERMAL-COAL 27000 158 44060
ADHUNIK POWER U-2 ADHUNIK POWER THERMAL-COAL 27000 168 44250
VL-JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 332800 23622
JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 43000 45250
JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 71700 37030
JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 70700 35920
JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 71100 38870
JOJOBERA UNIT 5 TATA POWER COM LTD THERMAL-COAL 12000 79300 44560
JOJOBERA UNIT 6 TATA POWER COM LTD THERMAL-WHR 12000 83700 12840
IEL KALINGANAGAR U-I TATA POWER COM LTD THERMAL-WG 6750 33400 22500
IEL KALINGANAGAR U-II TATA POWER COM LTD THERMAL-WG 6750 34800 22500
MAITHON UNIT 1 amp 2 TATA POWER COM LTD THERMAL-COAL 105000 678000 36100
HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 27500 24340
HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 28400 24340
HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 15800 24310
NORTH EASTERN REGION
CENTRAL SECTOR
LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 74100 36600
AGARTALA GT NEEPCO THERMAL-GAS 13500 88611 27210
ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 153111 32310
DOYANG HEP NEEPCO HYDRO-HYDRO 7500 25598 49801
KOPILI HEP NEEPCO HYDRO-HYDRO 20000 98186 11491
KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 19582 20237
KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 10310 17968
RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 124093 22945
TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 10100 17344 39000
STATE SECTOR
HYDRO POWER (122 Stns) ITANAGAR GOVT OF ARUNACHAL
PRADESHHYDRO-HYDRO 6971 6217270
24600
KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39514 17337
LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 82327 36810
NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 33318 48290
MYNTRIANG SHEP ST II ASSAM POWER GENCO HYDRO-HYDRO 300 567 35776
LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 9130 49200
LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 012 49200
DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 022 49200
TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 000 49200
UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 4990 16000
UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 6476 37000
UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 16494 14600
UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 3600 9556 15000
SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 758 8000
MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44070 44800
KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 154 41400
TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 091 41400
MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 411 41400
MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 394 41400
KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 760 41400
SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 3264 41400
LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 044 41400
BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 18953 28000
ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 43585 28200
GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 4080 11100
Note
LIG Lignite N Naptha WHR Waste Heat Recovery
Page 41
(As on 30042019)
Coal Lignite Gas Diesel Total
State 000 000 000 000 000 000 000 7070 7070
Private 28100 000 000 000 28100 000 000 25545 53645
Central 384933 000 000 000 384933 000 11000 000 395932
Sub-Total 413033 000 000 000 413033 000 11000 32615 456647
State 42000 000 000 000 42000 000 13000 405 55405
Private 73000 000 000 000 73000 000 000 3495 76495
Central 39374 000 000 000 39374 000 6100 000 45474
Sub-Total 154374 000 000 000 154374 000 19100 3900 177374
State 540000 000 10000 000 550000 000 98600 12195 660795
Private 243700 000 000 000 243700 000 000 35250 278950
Central 76077 000 000 000 76077 000 41000 000 117077
Sub-Total 859777 000 10000 000 869777 000 139600 47445 1056822
State 000 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 000 000 000
Central 698504 000 000 000 698504 000 18620 000 717124
Sub-Total 698504 000 000 000 698504 000 18620 000 717124
State 42000 000 000 000 42000 000 206192 2630 250822
Private 293900 000 000 000 293900 000 000 47346 341246
Central 163390 000 000 000 163390 000 8900 1000 173290
Sub-Total 499290 000 000 000 499290 000 215092 50976 765358
State 000 000 000 000 000 000 36000 5211 41211
Private 000 000 000 000 000 000 39900 001 39901
Central 8703 000 000 000 8703 000 6400 000 15103
Sub-Total 8703 000 000 000 8703 000 82300 5212 96215
112683 000 000 000 112683 000 8501 000 121184
State 624000 000 10000 000 634000 000 353792 27511 1015303
Private 638700 000 000 000 638700 000 39900 111637 790237
Central 1483664 000 000 000 1483664 000 100520 1000 1585184
Grand Total 2746364 000 10000 000 2756364 000 494212 140148 3390724
Total (Eastern
Region)
Bihar
Jharkhand
West Bengal
DVC
Odisha
Sikkim
Central - Unallocated
HydroOwnership Sector
Mode wise breakup
Grand TotalThermalNuclear
RES
(MNRE)
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
State
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
EASTERN REGION
(As on 30042019)
Coal Lignite Gas Diesel Total
State 000 000 32821 000 32821 000 10000 501 43322
Private 000 000 2450 000 2450 000 000 2650 5100
Central 40852 000 43556 000 84408 000 35708 2500 122616
Sub-Total 40852 000 78827 000 119679 000 45708 5651 171038
State 000 000 000 000 000 000 000 10711 10711
Private 000 000 000 000 000 000 000 2939 2939
Central 3705 000 4682 000 8387 000 11655 000 20042
Sub-Total 3705 000 4682 000 8387 000 11655 13650 33692
State 000 000 000 000 000 000 32200 3253 35453
Private 000 000 000 000 000 000 000 012 012
Central 4560 000 10969 000 15529 000 7227 000 22756
Sub-Total 4560 000 10969 000 15529 000 39427 3265 58221
State 000 000 16950 000 16950 000 000 1601 18551
Private 000 000 000 000 000 000 000 009 009
Central 5610 000 43695 000 49305 000 6849 500 56654
Sub-Total 5610 000 60645 000 66255 000 6849 2110 75214
State 000 000 000 3600 3600 000 000 545 4145
Private 000 000 000 000 000 000 000 344 344
Central 4710 000 7157 000 11867 000 9534 000 21401
Sub-Total 4710 000 7157 3600 15467 000 9534 889 25890
State 000 000 000 000 000 000 000 3067 3067
Private 000 000 000 000 000 000 000 100 100
Central 3210 000 4893 000 8103 000 5733 000 13836
Sub-Total 3210 000 4893 000 8103 000 5733 3167 17003
State 000 000 000 000 000 000 000 3647 3647
Private 000 000 000 000 000 000 000 050 050
Central 3105 000 4046 000 7151 000 9794 000 16945
Sub-Total 3105 000 4046 000 7151 000 9794 3697 20642
11250 000 6362 000 17612 000 14000 000 31612
State 000 000 49771 3600 53371 000 42200 23325 118895
Private 000 000 2450 000 2450 000 000 6104 8554
Central 77002 000 125360 000 202362 000 100500 3000 305862
Grand Total 77002 000 177581 3600 258183 000 142700 32429 433311
Assam
Arunachal Pradesh
Meghalaya
Tripura
Manipur
Nagaland
Mizoram
Central - Unallocated
Total (North-
Eastern Region)
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
NORTH-EASTERN REGION
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
State Ownership Sector
Mode wise breakup
Grand TotalThermalNuclear Hydro
RES
(MNRE)
(As on 30042019)
Coal Lignite Gas Diesel Total
State 000 000 000 4005 4005 000 000 525 4530
Private 000 000 000 000 000 000 000 663 663
Central 000 000 000 000 000 000 000 510 510
Sub-Total 000 000 000 4005 4005 000 000 1698 5703
State 000 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 000 075 075
Central 000 000 000 000 000 000 000 000 000
Sub-Total 000 000 000 000 000 000 000 075 075
State 000 000 000 4005 4005 000 000 525 4530
Private 000 000 000 000 000 000 000 738 738
Central 000 000 000 000 000 000 000 510 510
Grand Total 000 000 000 4005 4005 000 000 1773 5778
Andaman amp
Nicobar
Lakshadweep
Total (Islands)
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
ISLANDS
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
State Ownership Sector
Mode wise breakup
Grand TotalThermalNuclear Hydro
RES
(MNRE)
SrNo Contents Page
1 Executive summary of Target and Achievement of Transmission Lines during 2019-20
20(1)
2 List of Transmission Lines CommissionedReady for commissioning during Apr-2019 20(2)
Section C - Transmission Lines
1 Executive summary of Target and Achievement of Transmission Lines during 2019-20 As on 30-04-19
(All figures in circuit kms)
Ce
ntr
al S
ecto
r
Sta
te S
ecto
r
JV
Pri
va
te S
ecto
r
To
tal
Ce
ntr
al S
ecto
r
Sta
te S
ecto
r
JV
Pri
va
te S
ecto
r
To
tal
Ce
ntr
al S
ecto
r
Sta
te S
ecto
r
JV
Pri
va
te S
ecto
r
To
tal
Ce
ntr
al S
ecto
r
Sta
te S
ecto
r
JV
Pri
va
te S
ecto
r
To
tal
Ce
ntr
al S
ecto
r
Sta
te S
ecto
r
JV
Pri
va
te S
ecto
r
To
tal
Ce
ntr
al
Se
cto
r
Sta
te S
ec
tor
JV
Pri
va
te S
ec
tor
Gra
nd
To
tal
0 0 0 0 0 0 0 0 2727 958 2334 6019 2239 3416 1143 6798 781 10023 0 10804 5747 14397 3477 23621
Apr19 Programme 0 0 0 0 0 0 0 0 577 416 557 1550 60 890 203 1153 0 309 0 309 637 1615 760 3012
Achievement 0 0 0 0 0 0 0 0 53 0 0 53 0 20 0 20 0 401 0 401 53 421 0 474
Upto Apr-19 Programme 0 0 0 0 0 0 0 0 577 416 557 1550 60 890 203 1153 0 309 0 309 637 1615 760 3012
Achievement 0 0 0 0 0 0 0 0 53 0 0 53 0 20 0 20 0 401 0 401 53 421 0 474
20(1)
220 kV Grand Total 800 kV 500 kV
Programme 2019-20
Programme
Achievement
HVDC765 kV 400 kV
Line
1 2 3 4 5 6
1 400 Bhadla (PG) - Bhadla (RVPN) line DC PGCIL 53
53
2 400 LILO of one ckt Jhanor - Navsari at Vav Ss DC GETCO 20
3 220 Banda-Chitrakoot Line DC UPPTCL 226
4 220 Gorakhpur (PG)-Gola line DC UPPTCL 82
5 220 Hapur(765) - Faridnagar line SC UPPTCL 11
6 220 Kalikiri - Madanapalli line DC APTRANSCO 60
7 220LILO of Gr Noida -Noida Sec-129 at Noida
Sec-148DC UPPTCL 1
8 220LILO of one Ckt of Badshahpur Pali at Sec-
65 GurgaonDC HVPNL 3
9 220 Sultanpur-Sangipur LILO Section at Amethi DC UPPTCL 18
421
0
474
20(2)
Grand Total
2Transmission Lines (220 kV and above) CommissionedReady for commissioning During Apr-2019
Voltage
Level (kV)Name of Transmission Lines
Circuit
Type
Executing
Agency
CENTRAL SECTOR
Total of CENTRAL SECTOR
STATE SECTOR Sector
Total of STATE SECTOR
PRIVATE SECTOR
Total of PRIVATE SECTOR
SlNo
Length(CKm)
As on 30-04-19
SN Contents Page
1 Executive summary of Target and Achievement of Substations during 2019-20 21(1)
2Sub Stations (220 kV and above) commissionedready for commisssioning during Apr-
201921(2)
Section D - Sub Stations
1 Executive summary of Target and Achievement of Substations during 2019-2020 As on 30-04-19
(All figures in circuit MVA)
Ce
ntr
al S
ecto
r
Sta
te S
ecto
r
JV
Pri
va
te S
ecto
r
To
tal
Ce
ntr
al S
ecto
r
Sta
te S
ecto
r
JV
Pri
va
te S
ecto
r
To
tal
Ce
ntr
al S
ecto
r
Sta
te S
ecto
r
JV
Pri
va
te S
ecto
r
To
tal
Ce
ntr
al S
ecto
r
Sta
te S
ecto
r
JV
Pri
va
te S
ecto
r
To
tal
Ce
ntr
al S
ecto
r
Sta
te S
ecto
r
JV
Pri
va
te S
ecto
r
To
tal
Ce
ntr
al S
ec
tor
Sta
te S
ec
tor
JV
Pri
va
te S
ec
tor
Gra
nd
To
tal
3000 0 0 3000 0 0 0 0 18000 3000 6000 27000 5205 19665 4260 29130 800 21786 0 22586 27005 44451 10260 81716
Apr19 Programme 0 0 0 0 0 0 0 0 3000 0 3000 6000 0 1000 2000 3000 0 800 0 800 3000 1800 5000 9800
Achievement 0 0 0 0 0 0 0 0 500 0 0 500 815 1980 0 2795 0 1305 0 1305 1315 3285 0 4600
Upto Apr-19 Programme 0 0 0 0 0 0 0 0 3000 0 3000 6000 0 1000 2000 3000 0 800 0 800 3000 1800 5000 9800
Achievement 0 0 0 0 0 0 0 0 500 0 0 500 815 1980 0 2795 0 1305 0 1305 1315 3285 0 4600
21(1)
220 kV Grand Total 800 kV 500 kV
Programme 2019-20
Programme
Achievement
HVDC765 kV 400 kV
As on 30-04-19
Sl Voltage Ratio Capacity
No (kVkV) (MWMVA)
1 2 3 4 5
1 Bhadla SS (3x1500 3x500 MVA) 765400 PGCIL 500
2 Extn at Tumkur (Pavagada ) PS (2x500 MVA) 400220 PGCIL 500
3 Bongaigaon (2nd ICT) Ss 400220 PGCIL 315
Total of CENTRAL SECTOR 1315
4 Motiram Adda Gorakhpur (Aug) (Additional TF) 400220 UPPTCL 240
5 Muradnagar-II Ghaziabad (Aug) (Additional TF) 400220 UPPTCL 240
6 Noida Sec- 148 GBNagar (New) 400220 UPPTCL 5007 Sarnath Varanasi (Aug) TF- II (500-315) 400220 UPPTCL 1858 Sarojininagar Lucknow Aug) TF- II (500-315) 400220 UPPTCL 185
9 Unnao (Aug) TF-III 400220 UPPTCL 31510 Nawada SS 400220 HVPNL 31511 Kharepatan SS 22033 MSETCL 2512 Prathipadu SS 220132 APTRANSCO 10013 Pali Ss 22066 HVPNL 160
14 A-5 Faridabad Ss 22066 HVPNL 60
15 Rentachintala Ss Aug(3X100-2x100) 220132 APTRANSCO 10016 Amethi Ss 220132 UPPTCL 160
17 Gajokhar Varanasi (Aug) TF- II (160-100) 220132 UPPTCL 60
18 Gola Gorakhpur (New) 220132 UPPTCL 160
19 Khurja Bulandshahr (Aug) TF- II (200-160) 220132 UPPTCL 40
20 RC Green GB Nagar (Aug) TF-II (160-100) 220132 UPPTCL 60
21 Sikandrabad Bulandshahr (Aug) (Additional TF) 220132 UPPTCL 160
22 Sitapur (Aug) (Additional TF) 220132 UPPTCL 160
23 Sohawal Ayodhya (Aug) TF-II (160-100) 220132 UPPTCL 60
TOTAL STATE SECTOR 3285
GRAND TOTAL 4600
21(2)
CENTRAL SECTOR
STATE SECTOR
2Sub-Stations (220 kV and above) CommissionedReady for commissioning During Apr-2019
Name of Sub Stations Executing Agency
SN Contents Page
1 Electricity Generation (MU) Targets and Achievements for 2019-20 22
Section E - Electricity Generation
Programme Achievement Ach Programme Achievement Ach
Central Sector 37545100 3177900 3129530 9848 3177900 3129530 9848
State Sector 37498600 3322500 2950558 8881 3322500 2950558 8881
PvtIPP Sector 37346200 3236400 3195940 9875 3236400 3195940 9875
PvtUTL Sector 1823100 159300 165579 10394 159300 165579 10394
Total 114213000 9896100 9441607 9541 9896100 9441607 9541
Central Sector 5661700 386100 481390 12468 386100 481390 12468
State Sector 6680500 498200 536514 10769 498200 536514 10769
PvtIPP Sector 1206900 57300 80405 14032 57300 80405 14032
PvtUTL Sector 144100 12300 10930 8886 12300 10930 8886
Total 13693200 953900 1109239 11628 953900 1109239 11628
Central Sector 4472000 367300 317765 8651 367300 317765 8651
Total 4472000 367300 317765 8651 367300 317765 8651
Bhutan Import 621800 17500 24396 13941 17500 24396 13941
Central Sector 47678800 3931300 3928685 9993 3931300 3928685 9993
State Sector 44179100 3820700 3487072 9127 3820700 3487072 9127
Pvt Sector 40520300 3465300 3452854 9964 3465300 3452854 9964
Total 133000000 11234800 10893007 9696 11234800 10893007 9696
Provisional based on actual-cum-Assesment
Figs in MU
Cummulative
Achievement
Cummulative
Achievement
Mar-19 Mar-18 Upto Mar-2019 Upto Mar-2018
984785 869291 12675910 10183949
22
1 Electricity Generation (MU) Targets and Achievememts for 2019-20
All India Energy Generation During Apr-19 to Apr-19 (MU)
Target (2019-20)Apr-19 to Apr-19
Sector
Hydro
Thermal
Nuclear
Renewable Energy Generation
Achievement
Apr-2019
98961
95393673
112348
94416
11092
3178
108930
0
20000
40000
60000
80000
100000
120000
Thermal Hydro Nuclear Total
Programme
Achievement
SN Contents Page
1 Energy Power Supply Position (Provisional) for Apr-2019 and during Apr-19 to Apr-19 23
2 Peak Power Supply Position (Provisional) for Apr-2019 and during Apr-19 to Apr-19 24
3 Energy Power Supply Position (Revised) for Mar-2019 and during Apr-19 to Mar-19 25
4 Peak Power Supply Position (Revised) for Mar-2019 and during Apr-19 to Mar-19 26
5 Notified Power cuts Restrictions on Industries during Apr-2019 27
6 Power Supply to Agricultural Sector during Apr-2019 28
Section F - Power supply position
आकड़ मममलयन यननट नट Figures in MU net
ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied
कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )
चडीगढ़ Chandigarh 117 117 0 00 117 117 0 00
दिलली Delhi 2698 2698 1 00 2698 2698 1 00
हरियजणज Haryana 3773 3773 0 00 3773 3773 0 00
दहमजचल परिश Himachal Pradesh 777 777 0 00 777 777 0 00
रमम कशमीि Jammu amp Kashmir 1604 1296 308 192 1604 1296 308 192
परजब Punjab 3646 3646 0 00 3646 3646 0 00
िजरसथजन Rajasthan 6210 6208 2 00 6210 6208 2 00
उतति परिश Uttar Pradesh 10179 10148 32 03 10179 10148 32 03
उततिजखड Uttarakhand 1120 1120 0 00 1120 1120 0 00
उततरी कषतर Northern Region 30094 29786 308 10 30094 29786 308 10
छततीसगढ़ Chhattisgarh 2684 2676 8 03 2684 2676 8 03
गरिजत Gujarat 10718 10718 0 00 10718 10718 0 00
मधय परिश Madhya Pradesh 6006 6006 0 00 6006 6006 0 00
महजिजषटर Maharashtra 14308 14308 0 00 14308 14308 0 00
िमन औि दिउ Daman amp Diu 220 220 0 00 220 220 0 00
िजिि व नगि हवली Dadra amp Nagar Haveli 552 552 0 00 552 552 0 00
गोवज Goa 388 388 0 00 388 388 0 00
पशचिमी कषतर Western Region 34875 34868 8 00 34875 34868 8 00
आनधर परिश Andhra Pradesh 5708 5708 0 00 5708 5708 0 00
तलगजनज Telangana 5725 5725 0 00 5725 5725 0 00
कनजाटक Karnataka 7003 7003 0 00 7003 7003 0 00
किल Kerala 2402 2400 2 01 2402 2400 2 01
तममल नजड Tamil Nadu 10010 10010 0 00 10010 10010 0 00
पडचिी Puducherry 263 263 0 00 263 263 0 00
लकष-दवीप Lakshadweep 4 4 0 0 4 4 0 0
दकषकषणी कषतर Southern Region 31111 31109 2 00 31111 31109 2 00
बबहजि Bihar 2589 2589 0 00 2589 2589 0 00
िजमोिि घजटी ननगम DVC 1772 1772 0 00 1772 1772 0 00
झजिखणड Jharkhand 689 689 0 00 689 689 0 00
ओडडशज Odisha 2689 2689 1 00 2689 2689 1 00
पशशचम बगजल West Bengal 5075 5075 0 00 5075 5075 0 00
मसशककम Sikkim 37 37 0 00 37 37 0 00
अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 7 29 27 2 7
परवी कषतर Eastern Region 12851 12850 1 00 12851 12850 1 00
अरणजचल परिश Arunachal Pradesh 66 66 0 05 66 66 0 05
असम Assam 766 709 57 75 766 709 57 75
मणणपि Manipur 68 67 1 15 68 67 1 15
मघजलय Meghalaya 170 160 10 59 170 160 10 59
ममज़ोिम Mizoram 54 53 0 08 54 53 0 08
नजगजलड Nagaland 54 54 0 08 54 54 0 08
बिपिज Tripura 122 120 1 12 122 120 1 12
उततर-परवी कषतर North-Eastern Region 1300 1228 71 55 1300 1228 71 55
समपणण भारत All India 110231 109842 389 04 110231 109842 389 04
23
ऊरजा पनत ा म कमी ऊरजा पनत ा म कमीEnergy not Supplied
Excludes energy exported to Bangladesh
Energy not Supplied
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
ऊराण वरवदयत आपरत ण शथिरत ररपोरण (परवाणरवलोकन) Energy Power Supply Position Report (Provisional)
राजयState
अपरल 2019 April2019 अपरल2019 -अपरल2019 April2019 to April2019
अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met
कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )
चडीगढ़ Chandigarh 256 256 0 00 256 256 0 00
दिलली Delhi 5664 5664 0 00 5664 5664 0 00
हरियजणज Haryana 8127 8127 0 00 8127 8127 0 00
दहमजचल परिश Himachal Pradesh 1387 1387 0 00 1387 1387 0 00
रमम कशमीि Jammu amp Kashmir 2826 2261 565 200 2826 2261 565 200
परजब Punjab 7015 7015 0 00 7015 7015 0 00
िजरसथजन Rajasthan 10560 10560 0 00 10560 10560 0 00
उतति परिश Uttar Pradesh 19935 19935 0 00 19935 19935 0 00
उततिजखड Uttarakhand 1922 1922 0 00 1922 1922 0 00
उततरी कषतर Northern Region 54476 53985 491 09 54476 53985 491 09
छततीसगढ़ Chhattisgarh 4596 4574 22 05 4596 4574 22 05
गरिजत Gujarat 17871 17865 6 00 17871 17865 6 00
मधय परिश Madhya Pradesh 10018 10018 0 00 10018 10018 0 00
महजिजषटर Maharashtra 23158 23150 8 00 23158 23150 8 00
िमन औि दिउ Daman amp Diu 341 340 1 02 341 340 1 02
िजिि व नगि हवली Dadra amp Nagar Haveli 818 818 0 00 818 818 0 00
गोवज Goa 594 594 0 00 594 594 0 00
पशचिमी कषतर Western Region 56242 56222 20 00 56242 56222 20 00
आनधर परिश Andhra Pradesh 9151 9151 0 00 9151 9151 0 00
तलगजनज Telangana 10191 10191 0 00 10191 10191 0 00
कनजाटक Karnataka 12681 12681 0 00 12681 12681 0 00
किल Kerala 4309 4300 8 02 4309 4300 8 02
तममल नजड Tamil Nadu 15972 15972 0 00 15972 15972 0 00
पडचिी Puducherry 482 480 2 05 482 480 2 05
लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0
दकषकषणी कषतर Southern Region 49155 49103 52 01 49155 49103 52 01
बबहजि Bihar 5357 5357 0 00 5357 5357 0 00
िजमोिि घजटी ननगम DVC 3039 3039 0 00 3039 3039 0 00
झजिखणड Jharkhand 1266 1266 0 00 1266 1266 0 00
ओडडशज Odisha 5389 5389 0 00 5389 5389 0 00
पशशचम बगजल West Bengal 8666 8666 0 00 8666 8666 0 00
मसशककम Sikkim 100 100 0 00 100 100 0 00
अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7
परवी कषतर Eastern Region 23349 23349 0 00 23349 23349 0 00
अरणजचल परिश Arunachal Pradesh 139 136 3 22 139 136 3 22
असम Assam 1712 1667 45 26 1712 1667 45 26
मणणपि Manipur 197 188 9 46 197 188 9 46
मघजलय Meghalaya 336 336 0 00 336 336 0 00
ममज़ोिम Mizoram 116 113 3 26 116 113 3 26
नजगजलड Nagaland 157 131 26 166 157 131 26 166
बिपिज Tripura 292 291 1 03 292 291 1 03
उततर-परवी कषतर North-Eastern Region 2848 2780 68 24 2848 2780 68 24
समपणण भारत All India 177411 176810 601 03 177411 176810 601 03
24
मजग की पनत ा म कमी Demand not Met
Excludes the supply to Bangladesh
राजयStateअपरल 2019 April2019
मजग की पनत ा म कमी Demand not Met
अधिकतम वरवदयत आपरत ण शथिरत ररपोरण (परवाणरवलोकन) Peak Power Supply Position Report (Provisional)
आकड़ मगज वजट नट Figures in MW netअपरल2019 -अपरल2019 April2019 to April2019
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
आकड़ मममलयन यननट नट Figures in MU net
ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied
कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )
चडीगढ़ Chandigarh 96 96 0 00 1561 1561 0 00
दिलली Delhi 1931 1930 1 00 32299 32282 17 01
हरियजणज Haryana 3658 3658 0 00 53665 53665 0 00
दहमजचल परिश Himachal Pradesh 832 830 2 02 9850 9618 232 24
रमम कशमीि Jammu amp Kashmir 1767 1414 353 200 19593 15868 3725 190
परजब Punjab 3585 3585 0 00 55288 55275 13 00
िजरसथजन Rajasthan 6774 6770 4 01 79826 79637 189 02
उतति परिश Uttar Pradesh 8754 8691 63 07 117101 116118 984 08
उततिजखड Uttarakhand 1067 1067 0 00 13845 13753 92 07
उततरी कषतर Northern Region 28464 28041 423 15 383028 377776 5251 14
छततीसगढ़ Chhattisgarh 2464 2457 8 03 26130 26076 54 02
गरिजत Gujarat 9890 9890 0 00 116588 116572 15 00
मधय परिश Madhya Pradesh 6236 6236 0 00 75667 75665 2 00
महजिजषटर Maharashtra 13631 13631 0 00 158285 158148 137 01
िमन औि दिउ Daman amp Diu 221 221 0 00 2557 2557 0 00
िजिि व नगि हवली Dadra amp Nagar Haveli 553 553 0 00 6317 6317 0 00
गोवज Goa 362 362 0 00 4283 4280 3 01
पशचिमी कषतर Western Region 33357 33349 8 00 389827 389615 212 01
आनधर परिश Andhra Pradesh 6072 6071 1 00 63735 63677 58 01
तलगजनज Telangana 6930 6929 1 00 66697 66635 62 01
कनजाटक Karnataka 7614 7612 1 00 71759 71690 69 01
किल Kerala 2489 2488 1 00 25029 24911 118 05
तममल नजड Tamil Nadu 10247 10245 2 00 109375 109273 102 01
पडचिी Puducherry 252 251 1 04 2761 2751 10 03
लकष-दवीप Lakshadweep 4 4 0 0 46 46 0 0
दकषकषणी कषतर Southern Region 33605 33597 8 00 339355 338938 417 01
बबहजि Bihar 2319 2318 1 00 30052 29827 225 07
िजमोिि घजटी ननगम DVC 1773 1772 1 00 22365 21995 369 17
झजिखणड Jharkhand 698 697 1 01 8682 8461 221 25
ओडडशज Odisha 2583 2582 1 00 31810 31781 30 01
पशशचम बगजल West Bengal 4585 4584 2 00 52237 52078 159 03
मसशककम Sikkim 41 41 0 00 513 512 0 01
अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 67 346 323 23 67
परवी कषतर Eastern Region 11999 11995 5 00 145658 144654 1004 07
अरणजचल परिश Arunachal Pradesh 61 60 0 06 864 855 9 10
असम Assam 680 656 23 34 9532 9204 328 34
मणणपि Manipur 68 68 1 09 916 906 10 11
मघजलय Meghalaya 173 173 0 03 1955 1953 1 01
ममज़ोिम Mizoram 50 49 0 09 668 661 8 12
नजगजलड Nagaland 58 57 1 20 902 809 93 103
बिपिज Tripura 150 150 0 00 1859 1837 21 11
उततर-परवी कषतर North-Eastern Region 1240 1214 26 21 16696 16225 471 28
समपणण भारत All India 108665 108196 469 04 1274564 1267209 7355 06
Note The revised data for March 2019 is not avaliable
Excludes energy exported to Bangladesh
राजयState
ऊराण वरवदयत आपरत ण शथिरत ररपोरण (परवाणरवलोकन) Energy Power Supply Position Report (Provisional)
25
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
Energy not Supplied Energy not Supplied
मािण2019 March2019 अपरल2018 -मािण2019 April2018 to March2019
ऊरजा पनत ा म कमी ऊरजा पनत ा म कमी
अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met
कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )
चडीगढ़ Chandigarh 223 223 0 00 369 369 0 00
दिलली Delhi 4016 4016 0 00 7016 7016 0 00
हरियजणज Haryana 6544 6544 0 00 10270 10270 0 00
दहमजचल परिश Himachal Pradesh 1683 1683 0 00 1700 1700 0 00
रमम कशमीि Jammu amp Kashmir 3277 2622 655 200 3277 2622 655 200
परजब Punjab 6564 6564 0 00 12638 12638 0 00
िजरसथजन Rajasthan 11885 11885 0 00 13276 13276 0 00
उतति परिश Uttar Pradesh 16220 16220 0 00 20498 20062 436 21
उततिजखड Uttarakhand 2002 2002 0 00 2216 2216 0 00
उततरी कषतर Northern Region 47925 47356 569 12 63166 61726 1440 23
छततीसगढ़ Chhattisgarh 4444 4128 316 71 4444 4270 174 39
गरिजत Gujarat 16263 16263 0 00 17053 16963 90 05
मधय परिश Madhya Pradesh 12328 12323 5 00 13815 13815 0 00
महजिजषटर Maharashtra 22361 22291 70 03 23864 23254 610 26
िमन औि दिउ Daman amp Diu 336 336 0 01 357 356 1 02
िजिि व नगि हवली Dadra amp Nagar Haveli 800 799 1 01 816 815 1 01
गोवज Goa 538 538 0 00 596 596 0 00
पशचिमी कषतर Western Region 53132 52965 167 03 56675 55821 853 15
आनधर परिश Andhra Pradesh 8977 8977 0 00 9459 9453 6 01
तलगजनज Telangana 10471 10471 0 00 10815 10815 0 00
कनजाटक Karnataka 12841 12841 0 00 12841 12841 0 00
किल Kerala 4264 4228 36 09 4264 4228 36 09
तममल नजड Tamil Nadu 15712 15712 0 00 15712 15712 0 00
पडचिी Puducherry 427 412 15 34 427 412 15 34
लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0
दकषकषणी कषतर Southern Region 49464 49464 0 00 49464 49464 0 00
बबहजि Bihar 4633 4633 0 00 5115 5084 31 06
िजमोिि घजटी ननगम DVC 3035 3035 0 00 3035 3035 0 00
झजिखणड Jharkhand 1210 1210 0 00 1339 1291 48 36
ओडडशज Odisha 4827 4827 0 00 5357 5357 0 00
पशशचम बगजल West Bengal 8287 8287 0 00 9130 9123 7 01
मसशककम Sikkim 100 100 0 00 106 106 0 00
अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7
परवी कषतर Eastern Region 21658 21658 0 00 23141 22733 408 18
अरणजचल परिश Arunachal Pradesh 133 131 2 15 138 138 0 01
असम Assam 1539 1508 31 20 1865 1809 56 30
मणणपि Manipur 204 199 5 25 219 216 3 12
मघजलय Meghalaya 357 357 0 00 374 372 1 04
ममज़ोिम Mizoram 108 105 3 28 121 119 2 17
नजगजलड Nagaland 127 125 2 16 156 138 18 116
बिपिज Tripura 249 249 0 00 298 293 5 17
उततर-परवी कषतर North-Eastern Region 2540 2535 5 02 2967 2850 117 39
समपणण भारत All India 169464 168745 719 04 177022 175528 1494 08
Note The revised data for March 2019 is not avaliable 26
अधिकतम वरवदयत आपरत ण शथिरत ररपोरण (परवाणरवलोकन) Peak Power Supply Position Report (Provisional)
आकड़ मगज वजट नट Figures in MW net
राजयStateमािण2019 March2019 अपरल2018 -मािण2019 April2018 to March2019
मजग की पनत ा म कमी मजग की पनत ा म कमी Demand not MetDemand not Met
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
Excludes the supply to Bangladesh
अपरल 2019 April2019 अपरल2018 -मािण2019 April2019 to April2019
उततरी कषतर Northern Region
चडीगढ़ Chandigarh(Data Not Received)दिलली Delhi
हरियजणज Haryana
दहमजचल परिश Himachal Pradeshरमम कशमीि Jammu amp Kashmir(Data
Not Received)परजब Punjab
िजरसथजन Rajasthanउतति परिश Uttar Pradesh
उततिजखड Uttarakhand
पशचिमी कषतर Western Region
छततीसगढ़ Chhattisgarh
Apr-Nov 2018- No cuts
Maximum Demand cut-58MW
Energy cut- 00020-00032 MUsday
गरिजत Gujarat
मधय परिश Madhya Pradesh
महजिजषटर Maharashtra
गोवज Goa
दकषकषणी कषतर Southern Region
आनधर परिश Andhra Pradesh
तलगजनज Telangana
कनजाटक Karnataka
किल Kerala
तममल नजड Tamil Nadu
पडचिी Puducherryपरवी कषतर Eastern Region
बबहजि Bihar
झजिखणड Jharkhand
ओडडशज Odisha
पशशचम बगजल West Bengal
No N
otifie
d Cu
ts
27
मािण 2019 म इडथरीर पर वरवदयत करौती का वरवरवरण Notified Power CutsRestrictions on Industries during April2019
राजय कषतर State Regionऊराणमाग करौती EnergyDemand Cut
No N
otifie
d Cu
tsNo
Notifie
d Cu
ts
अपरल2019 April 2019 अपरल2019 -अपरल2019 April2019 to April2019
उततरी कषतर Northern Region
चडीगढ़ Chandigarh Data not received Data not received
दिलली Delhi Data not received Data not received
हरियजणज Haryana 0811 hrsday 0811 hrsday
दहमजचल परिश Himachal Pradesh HPSEBL has only 2 agriculture consumers and uninterrupted
power is being supplied to agriculture sector
HPSEBL has only 2 agriculture consumers and uninterrupted
power is being supplied to agriculture sector
रमम कशमीि Jammu amp Kashmir Data not received Data not received
परजब Punjab 379 hrsday 379 hrsday
िजरसथजन Rajasthan 0630 hrsday 0630 hrsday
उतति परिश Uttar Pradesh 2157 hrsday 2157 hrsday
उततिजखड Uttarakhand 2359 hrsday 2359 hrsday
पशचिमी कषतर Western Region
छततीसगढ़ Chhattisgarh 18 hrsday 18 hrsday
गरिजत Gujarat 8 hrsday 8 hrsday
मधय परिश Madhya Pradesh Three-Phase Supply(Irrigation)- 0953 hrs day Three-Phase
(Mixed) Supply - 2334 hrs day
Three-Phase Supply(Irrigation)- 0953 hrs day Three-Phase
(Mixed) Supply - 2334 hrs day
महजिजषटर Maharashtra Three-Phase Supply(Irrigation)- 9 hrs day Three-Phase Supply(Irrigation)- 9 hrs day
गोवज Goa No restriction No restriction
दकषकषणी कषतर Southern Region
आनधर परिश Andhra Pradesh 07 hrsday 07 hrsday
तलगजनज Telangana 24 hrsday 24 hrsday
कनजाटक Karnataka 6 hrsday 6 hrsday
किल Kerala No Restrictions No Restrictions
तममल नजड Tamil Nadu 9 hrsday (6 hrs during day time and 3 hrs during night time) 9 hrsday (6 hrs during day time and 3 hrs during night time)
पडचिी Puducherry No Restrictions No Restrictions
परवी कषतर Eastern Region
बबहजि Bihar 18 hrsday 18 hrsday
झजिखणड Jharkhand 20 hrsday 20 hrsday
ओडडशज Odisha 24 hrsday 24 hrsday
पशशचम बगजल West Bengal 23 hrsday 23 hrsday
28
मारच 2019 कषि कषतर को षिदयत आपरतच का षििरण Power Supply to Agricultural Sector during March2019
राजय कषतर State Regionऔसत वरवदयत आपरत ण घनरो म Average Hours of Supply
On segregated feeders
SNo Contents Page
1 Growth of Installed Capacity since 6th Plan 29
2 Progress of Transmission Sector since 6th Plan 30
3 All India Yearly Coal consumption for Power Generation (Utilities)
4 All India Annual Per Capita Consumption of Electricity since -2006
5 Average cost of power supply amp Average realisation (Paisakwh)
6 Growth of Rural Electrification amp Pump Sets Energisation
7 Status of Hydro Schemes Cleared by the CEA in Apr-2019
Section G - Growth of Power Sector
31
32
(In MW)
Coal Gas Diesel Total
End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472
End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634
End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537
End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596
End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921
End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703
End of 12th Plan 19216288 2532938 83763 21832988 6780 4447842 50018 31960630
Up to Apr-2019 20070450 2493722 63763 22627934 678000 4539922 7764163 35610019
Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-17) = 51529 MW
Electricity Generation (MU) Targets and Achievements for 2016-17
Coal Gas Diesel Nuclear Hydro Res Total
2007045 2493722 637629 678000 453992 77641625 22925174
29
1 Growth of Installed Capacity Since 6th Plan
Plan YearThermal
Nuclear Hydro RES (MNRE) Total
2007045
2493722637629
678000
4539922
77641625
Total Installed Capacity 35610019 MW
Coal Gas Diesel Nuclear Hydro Res
Progress of Transmission Sector in the Country up to April 2019
1 TRANSMISSION LINES (All fig in CKM)
At the end of
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
6th plan 0 0 0 0 0 0 0 0 0 0 0 0 1831 4198 0 6029 1641 44364 0 46005 3472 48562 0 52034
7th plan 0 0 0 0 0 0 0 0 0 0 0 0 13068 6756 0 19824 4560 55071 0 59631 17628 61827 0 79455
8th plan 0 0 0 0 1634 0 0 1634 0 0 0 0 23001 13141 0 36142 6564 73036 0 79600 31199 86177 0 117376
9th plan 0 0 0 0 3234 1504 0 4738 751 409 0 1160 29345 20033 0 49378 8687 88306 0 96993 42017 110252 0 152269
10th plan 0 0 0 0 4368 1504 0 5872 1775 409 0 2184 48708 24730 0 73438 9444 105185 0 114629 64295 131828 0 196123
11th Plan 0 0 0 0 5948 1504 1980 9432 4839 411 0 5250 71023 30191 5605 106819 10140 125010 830 135980 91950 157116 8415 257481
12th Plan 6124 0 0 6124 5948 1504 1980 9432 25465 1177 4598 31240 92482 48240 17065 157787 11014 151276 978 163268 141033 202197 24621 367851
13th Plan (Up
to Mar2019)6124 0 0 6124 5948 1504 1980 9432 33692 1512 6605 41809 101335 58238 21173 180746 11734 162552 1010 175296 158833 223806 30768 413407
13th Plan (Up
to Apr-19)6124 0 0 6124 5948 1504 1980 9432 33745 1512 6605 41862 101335 58258 21173 180766 11734 162953 1010 175697 158886 224227 30768 413881
27150 600 MW of 132 kV Inter-Regional power transmission capacity links which are operated radially from time to time is not added in the total
75050
47900
24000
99050
30
Grand Total
Note - The figure upto the end of 10th plan in for stringing progress including the lines not commissioned Now only commissioned lines are reckoned Accordingly the figure for 10th plan (end) may read
as 187555 after adjusting with (-) 10852 Ckm
Inter-regional Power Transfer Capacity (MW)
plusmn 800 kV HVDC plusmn 500 kV HVDC 765 kV 400 kV 220 kV
IR addition in 12th
Plan (up to March
2017)
Inter-regional
Transmission
Capacity at the end
of Plan Period 2017-
22 (as on April19)
IR at the end of 11th
PlanIR at the end of 12th
Plan
IR Capacity Addition
at the end of Plan
Period 2017-22 (Till
April 19)
2004-05 27800
2005-06 28100
2006-07 30200
2007-08 33000
2008-09 35500
2009-10 36700
2010-11 38700
2011-12 41756
2012-13 45460
2013-14 48940
2014-15 53040
2015-16 54590
2016-17 57430
2017-18 60800
2018-19 62890
Year
2005-06
2006-07
2007-08
2008-09
2009-10
2010-11
2011-12
2012-13
2013-14
2014-15
2015-16
2016-17
2017-18
2018-19
2004-05 254 209 7568
2005-06 260 221 7636
2006-07 276 227 7423
2007-08 293 239 7727
2008-09 340 263 8713
2009-10 355 268 8870
2010-11 398 303 11975
2011-12 455 330 13514
2012-13 501 376 14867
2013-14 518 175
2014-15 520
Source- PFC Reports on the performance of State Power Utilities 31
1181
7335
7786
91441
8188
88363
957
1010
1075
1122
1149
(GrossGen+ Net Import) Mid-year population Provisional
5 Average cost of power supply amp average realization ( paiseKWH )
Yearcost of supply
(paiseunit)
Realization(paiseunit)
Including AgricultureOnly
Agriculture
6719
7171
3 All India yearly Coal Consumption for Power Generation (Utilities)
YEARCoal Consumption
Million Tonnes
4 All India Annual per Capita consumption of Electricity Since 2006
Per Capita Consumption ( kWh)
6314
Sl
NoExecuting Agency
Installed
Capacity (MW)Cost (Rs crore)
Date of
Clearance
32
Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as
Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received
from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made
available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified
villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is
independent of the earlier published reports
No Hydro Electric Project has been issued concurrenceAppraisal letter by CEA during April 2019
7 Status of Hydro Schemes Cleared by the CEA in Apr-2019
Name of Scheme
1999-002000-01
297594
010408 to 310309010409 to 310310
10th Plan
2005-062006-07
322968331020
6 Growth Of Rural Electrification amp Pumpsets Energisation
Plan Year
9th Plan2002-03
134092626
4111
Pump Sets Energised Villages Electricfied (Nos)
2001-02
284064367244
1218
27801997-981998-99
3207
482864
12632
1576036
4451722594
15455554
2314176
397343611750
2093311060316074
65109527813884
46708
18423975
499150
2003-042004-05
5743
9769
Cumu upto End of 10th Plan
010407 to 310308
010410 to 310311557976840909
010411 to 310312
412667
86293726
No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification
since 2004-05
65291374575 296361511th Plan
Cumu upto End of 11th Plan
596556 21212860
557439Cummulative up to end of 12th Plan
SN Contents Page
1 Rate of sale of power for the year 2016-17 33-41
RATE OF SALE OF POWER FOR THE YEAR 2016-17
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) NORTHERN REGION
CENTRAL SECTOR
BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 18000 66900 19800
CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 54000 222400 21600
CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 30000 144400 19600
CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 23100 91700 42600
PARBATI - III HPS NHPC LTD HYDRO-HYDRO 52000 68200 54800
DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 28000 95600 30000
CHUTAK NHPC LTD HYDRO-HYDRO 4400 22000 79800
DULHASTI HPS NHPC LTD HYDRO-HYDRO 39000 228000 56400
SALAL HPS NHPC LTD HYDRO-HYDRO 69000 342300 11000
TANAKPUR HPS NHPC LTD HYDRO-HYDRO 9420 43000 29600
URI HPS -I NHPC LTD HYDRO-HYDRO 48000 280300 16000
URI HPS - II NHPC LTD HYDRO-HYDRO 24000 147300 48600
NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 4500 24600 88200
SEWA - II NHPC LTD HYDRO-HYDRO 12000 47100 43400
ANTA CCPP NTPC LTD THERMAL-GASN 41930 67539 32400
AURAIYA CCPP NTPC LTD THERMAL-GASN 66336 53501 39100
BADARPUR TPS NTPC LTD THERMAL-COAL 70500 159153 44800
DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 84000 296170 42300
DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 98000 526686 46300
DADRI CCPP NTPC LTD THERMAL-GASHSD 82978 227469 33000
FARIDABAD CCPP NTPC LTD THERMAL-GASN 43159 115577 30800
RIHAND STPS I NTPC LTD THERMAL-COAL 100000 596766 24500
RIHAND STPS II NTPC LTD THERMAL-COAL 100000 737069 24600
RIHAND STPS III NTPC LTD THERMAL-COAL 100000 706546 30600
SINGRAULI STPS NTPC LTD THERMAL-COAL 200000 1394068 20400
TANDA TPS NTPC LTD THERMAL-COAL 44000 295438 40800
UNCHAHAR TPS I NTPC LTD THERMAL-COAL 42000 256454 39800
UNCHAHAR TPS II NTPC LTD THERMAL-COAL 42000 273577 38900
UNCHAHAR TPS III NTPC LTD THERMAL-COAL 21000 142780 43000
KOLDAM NTPC LTD HYDRO-HYDRO 80000 363260 43600
NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 303575 25841
RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 108000 668677 35374
NJHPS SJVNL HYDRO-HYDRO 150000 699496 23820
RAMPUR HPS SJVNL HYDRO-HYDRO 41202 195982 32260
TEHRI HPP THDC HYDRO-HYDRO 100000 272543 51800
KOTESHWAR HEP THDC HYDRO-HYDRO 40000 106244 53400
IGSTPS JHAJJAR ARAVALI P CPL THERMAL-COAL 150000 510429 49490
NEYVELI BARSINGSAR NEYVELI LIG CORP LTD THERMAL-LIG 25000 127520 38040
STATE SECTOR
PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 21000 14222 48200
PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 21000 19205 48400
PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 25000 102257 42600
PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 25000 62107 41800
DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 60000 312213 41000
RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 120000 35767442200
WYC HYDEL STATION HPGCL HYDRO-HYDRO 6240 20365 24900
GIRI POWER HOUSE HPSEB HYDRO-HYDRO 6000 13958 7600
ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 1695 5467 11900
BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 12000 18528 6700
GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 2250 7462 22500
BASSI POWER HOUSE HPSEB HYDRO-HYDRO 6600 29649 7500
BINWA POWER HOUSE HPSEB HYDRO-HYDRO 600 2749 19300
ANNEXURE-I
RATE OF SALE OF POWER FOR THE YEAR 2016-2017
Page 33
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) GAJ POWER HOUSE HPSEB HYDRO-HYDRO 1050 2914 26700
BANER POWER HOUSE HPSEB HYDRO-HYDRO 1200 2864 16200
HOLI POWER HOUSE HPSEB HYDRO-HYDRO 300 616 22500
THIROT POWER HOUSE HPSEB HYDRO-HYDRO 450 1126 22500
KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 1200 3064 22500
LARJI POWER HOUSE HPSEB HYDRO-HYDRO 12600 53677 23700
NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 250 750 31000
CHABA POWER HOUSE HPSEB HYDRO-HYDRO 175 465 23300
RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 150 101 13400
SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 200 000 22500
KILLAR HPSEB HYDRO-HYDRO 030 050 22500
BHABA AUGUMENP H HPSEB HYDRO-HYDRO 450 1276 22500
BS CHAMBA HPSEB HYDRO-HYDRO 045 099 19500
GUMMA HPSEB HYDRO-HYDRO 300 423 22500
GAS TURBINE POWER STATION IPGCL THERMAL-GAS 27000 67233 39300
PPS-I PPCL THERMAL-GAS 33000 175905 38300
PPS-III PPCL THERMAL-GAS 137120 196879 36100
LOWER JHELUM JampKPDD HYDRO-HYDRO 10500 60214 5100
UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 2260 10514 6300
UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 10500 44202 8500
GANDHARBAL JampKPDD HYDRO-HYDRO 1500 8925 4700
KARNAH MPH JampKPDD HYDRO-HYDRO 200 1122 31000
CHENANI I JampKPDD HYDRO-HYDRO 2330 10892 6600
CHENANI II JampKPDD HYDRO-HYDRO 200 1188 9300
CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 750 3634 14200
IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 375 2108 18500
IGO MERCHELLONG JampKPDD HYDRO-HYDRO 300 1572 29700
PAHALGAM MHP JampKPDD HYDRO-HYDRO 450 1713 32900
MARPACHOO JampKPDD HYDRO-HYDRO 075 375 29800
HAFTAL JampKPDD HYDRO-HYDRO 100 483 28700
SANJAK JampKPDD HYDRO-HYDRO 126 441 36000
SEWA-III JampKPDD HYDRO-HYDRO 900 3273 20200
BHADERWAH JampKPDD HYDRO-HYDRO 150 935 8900
BAZGO JampKPDD HYDRO-HYDRO 030 108 33300
SUMOOR JampKPDD HYDRO-HYDRO 010 045 35400
HUNDER JampKPDD HYDRO-HYDRO 040 176 26200
STAKNA JampKPDD HYDRO-HYDRO 400 1933 4100
KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 124000 662879 31360
SURATGARH TPS RRVUNL THERMAL-COAL 150000 402328 41730
CHHABRA TPS 1amp 2 RRVUNL THERMAL-COAL 50000 305946 36700
CHHABRA TPS 3 RRVUNL THERMAL-COAL 25000 151536 36700
CHHABRA TPS 4 RRVUNL THERMAL-COAL 25000 155896 36700
RAMGARH GT POWER PROJECT RRVUNL THERMAL-COAL 22050 43177 41800
RAMGARH GAS T P PROJECT 3 RRVUNL THERMAL-GAS 5000 93615 41800
DHOLPUR C C POWER PROJECT RRVUNL THERMAL-R-LNG 33000 9486 46110
MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 14000 20855 34192
MINI MICRO HYDEL (MMH) P S RRVUNL HYDRO-HYDRO 2385 851 37800
KALISINDH TPP 1 RRVUNL THERMAL-COAL 60000 341543 45000
KALISINDH TPP 2 RRVUNL THERMAL-COAL 60000 211588 45000
KHARA HEP UPJVNL HYDRO-HYDRO 7200 26654 7200
MATATILLA HEP UPJVNL HYDRO-HYDRO 3060 12219 6500
OBRA HEP UPJVNL HYDRO-HYDRO 9900 21517 6300
RIHAND UPJVNL HYDRO-HYDRO 30000 57369 5500
ANPARA A TPS UPRVUNL THERMAL-COAL 63000 317536 27000
ANPARA B TPS UPRVUNL THERMAL-COAL 100000 705605 22700
ANPARA D UPRVUNL THERMAL-COAL 100000 300158 39800
HARDUAGANJ TPS UPRVUNL THERMAL-COAL 16500 45817 49200
HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 50000 304389 46600
OBRA A TPS UPRVUNL THERMAL-COAL 28800 13158 34000
OBRA B TPS UPRVUNL THERMAL-COAL 100000 328124 21900
Page 34
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) PANKI TPS UPRVUNL THERMAL-COAL 21000 66488 50300
PARICHHA TPS UPRVUNL THERMAL-COAL 22000 38762 49400
PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 42000 231931 45600
PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 50000 276722 50400
CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 24000 70845 8290
CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 14400 75366 8390
DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 3375 9595 12080
DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 5100 18701 10520
KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4140 17359 12330
KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 12000 33001 9420
KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 3000 11953 8320
TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 9000 33983 12460
MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 30400 124510 16110
RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 19800 17897 10550
MPUR UTTARAKHAND JVNL HYDRO-HYDRO 930 5121 19200
PATHRI UTTARAKHAND JVNL HYDRO-HYDRO 2040 11636 14200
GALOGI UTTARAKHAND JVNL HYDRO-HYDRO 300 648 12500
PRIVATE SECTOR
MGTPP CLP INDIA PVT LTD THERMAL-COAL 132000 268902 41940
SHRINAGAR HEP ALAKNANDA HPCL HYDRO-HYDRO 33000 127414 48800
GAMA INFRAPROP CCPP GAMA INFRAPROP PVT THERMAL-GAS 22500 52686 47000
PPGCL (BARA) JP POWER VENTURES LTD THERMAL-COAL 198000 448200 38500
MALANA HEP MALANA PCL HYDRO-HYDRO 8600 26354 29792
MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 10000 30369 32580
ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 19200 56347 36079
KASHANG HEP H P PCL HYDRO-HYDRO 19500 5034 29200
BASPA-II HEP HBPCL HYDRO-HYDRO 30000 132769 13600
KARCHAM WANGTOO HEP HBPCL HYDRO-HYDRO 100000 434386 36600
RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 108000 582600 43700
RITHALA COMBI CY POWER PLANT TATA POWER DDL THERMAL-GAS 9480 000 11900
RAJPURA TPS NABHA POWER LTD THERMAL-GAS 140000 901484 39000
TALWANDI SABO POWER LTD TALWANDI SABO POWER LTD THERMAL-COAL 198000 636040 49548
ROJA THERMAL POWER STATION ROJA POWER SCL THERMAL-COAL 120000 727200 43400
KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 34400 63400
BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 36000 62600
MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 38200 60800
UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 37900 61500
KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 42300 58800
LALITPUR PGCL BAJAJ ENERGY PVT LTD THERMAL-COAL 198000 359400 47300
PRAYAGRAJ PGCL PRAYAGRAJ PGCL THERMAL-COAL 132000 448200 38595
KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 132000 783182 33438
WESTERN REGION
CENTRAL SECTOR
INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 100000 325333 23892
OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 52000 141663 34001
GANDHAR CCPP NTPC LTD THERMAL-GAS 65739 221924 28700
KAWAS CCPP NTPC LTD THERMAL-GASN 65620 167929 27000
KORBA I amp II NTPC LTD THERMAL-COAL 210000 1499171 20500
KORBA III NTPC LTD THERMAL-COAL 50000 358746 26600
SIPAT STPS I NTPC LTD THERMAL-COAL 198000 1479902 26800
SIPAT STPS II NTPC LTD THERMAL-COAL 100000 766549 26500
VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 126000 693142 25800
VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 100000 608781 23800
VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 100000 673475 27600
VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 100000 655924 32900
VINDHYACHAL STPS V NTPC LTD THERMAL-COAL 50000 328265 31700
MOUDA I NTPC LTD THERMAL-COAL 100000 343130 44500
MOUDA Ii NTPC LTD THERMAL-COAL 66000 40637 39900
RATNAGIRI GAS amp POWER PVT LTD RGPPL THERMAL-GAS 196708 442485 47000
KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 000 24729
TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 32000 201227 10740
Page 35
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 365122 19069
TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 787444 29324
STATE SECTOR
GSEG-HAZIRA15610 MW GUJARAT S ENEGEN LTD THERMAL-GAS 15610 1805 28200
GSEG-HAZIRA35143 MW GUJARAT S ENEGEN LTD THERMAL-GAS 35130 22276 51300
GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 21978 51800
AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 13929 26100
KORBA TPS EAST CSPGCL THERMAL-COAL 44000 198673 33880
DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 365808 27570
KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 316500 30420
HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 532878 19410
CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 515 58300
MTTPS CHAMPA U-I CSPGCL THERMAL-COAL 50000 220376 39000
MTTPS CHAMPA U-II CSPGCL THERMAL-COAL 50000 23709 10000
SHP GANGREL CSPGCL HYDRO-HYDRO 1000 2350 36790
BANGO HEP CSPGCL HYDRO-HYDRO 12000 14662 8900
MHP KORBA WEST CSPGCL HYDRO-HYDRO 170 859 38190
SIKASAR HEP CSPGCL HYDRO-HYDRO 700 418 26870
DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8843 74500
DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 19446 51500
GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 66388 71600
GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127488 41300
KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 96072 43900
KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 29841 56400
SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 184966 58800
UKAI 1-5 GSECL THERMAL-COAL 85000 204891 46900
UKAI TPS 6 GSECL THERMAL-COAL 50000 284448 48200
WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 271999 58300
WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 82808 44100
KADANA HPS GSECL HYDRO-HYDRO 24200 34433 16800
UKAI HPS GSECL HYDRO-HYDRO 30500 40585 6100
TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 123000 11500
BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 8900 10900
BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 7200 27500
JHINNA HPS MPPGCL HYDRO-HYDRO 2000 9700 18500
RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 44300 3400
GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 17300 4600
SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 4100 16900
MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 14600 27000
PENCH HPS MPPGCL HYDRO-HYDRO 16000 23700 8100
RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 3000 16900
AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 134400 35100
SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 283800 38700
SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 344600 34300
SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 111600 61600
SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 211800 58000
SSTPS PH-I MPPGCL THERMAL-COAL 120000 233100 84300
BHUSAWAL TPS MSPGCL THERMAL-COAL 142000 566258 51100
CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1365682 33700
KHAPERKHEDA MSPGCL THERMAL-COAL 134000 706207 39100
KORADI TPS MSPGCL THERMAL-COAL 62000 443206 42000
NASIK TPS MSPGCL THERMAL-COAL 63000 297275 47000
PARLI TPS MSPGCL THERMAL-COAL 113000 175934 71600
PARAS MSPGCL THERMAL-COAL 50000 267931 38700
URAN CCPP MSPGCL THERMAL-GAS 67200 320330 30600
KOYANA MSPGCL HYDRO-HYDRO 195600 328155 13100
SMALL HYDRO POWER PLANTS MSPGCL HYDRO-HYDRO 45400 93062 30500
BHIRA MSPGCL HYDRO-HYDRO 8000 10046 8400
TILLARI MSPGCL HYDRO-HYDRO 8900 10584 3100
SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 233298 20500
SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 87633 20500
PRIVATE SECTOR
Page 36
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 81282 46750
JNSTPP(JAYPEE NIGRIE) JP POWER VENTURES LTD THERMAL-COAL 132000 726695 29310
MB POWER MB POWER THERMAL-COAL 120000 345632 38310
ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 754922 28671
ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 780761 23495
ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 198000 1263784 32090
ADANI POWER MAHARA ADANI POWER LTD THERMAL-COAL 330000 1666191 34124
AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 170065 36827
SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 252035 45129
ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 458551 36000
ESSAR POWER MP LTD ESSAR POWER MP LTD THERMAL-COAL 60000 243040 28600
VEDANTA LTD (P P -I) VEDANTA LTD THERMAL-GAS 3000 15044 24000
VEDANTA LTD (P P -II) VEDANTA LTD THERMAL-GAS 3000 21293 24000
PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 8234600 24000
165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 5850 64390
145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 68717 40349
SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 132655 28776
SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 144686 38567
MUNDRA UMPPCOASTAL GUJARAT POWER
LTD THERMAL-IMP COAL 400000 2530300
23900
LANCO AMARKANTAK TPP PATHADIH
U-ILANCO AMARKAN POWER LTD THERMAL-COAL 30000 195500
29200
LANCO AMARKANTAK TPP PATHADIH
U-IILANCO AMARKAN POWER LTD THERMAL-COAL 30000 206900
27600
BARADARHA TPS D B POWER LTD THERMAL-COAL 120000 677373 29200
JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 405000 28900
JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 453000 40500
DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 339437 40700
TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 293400 44000
TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 137200 37000
TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 174900 44000
BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 92900 14100
BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23700 34300
KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 27600 48300
CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2530300 23900
BHANDARDRA HEP -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 2475 54900
SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 161400 26500
SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 445000 39000
SOTHERN REGION
CENTRAL SECTOR
NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 325699 54820
NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 305532 39880
NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 998805 38510
NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 113016 54070
NEYVELI TAMILNADU POWER LTD JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 625274 42200
VALLUR TPS NTPC TECL THERMAL-COAL 150000 856438 42350
R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 1493 84300
RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1502919 29400
RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 341291 31800
SIMHADRI I NTPC LTD THERMAL-COAL 100000 688382 36800
SIMHADRI II NTPC LTD THERMAL-COAL 100000 663657 43400
KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 593110 31324
MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 291625 21764
KKNPP-1 amp 2 NPCIL NUCLEAR-NUCLEAR 200000 572609 40948
MINICOY LAKSHADEEP THERMAL-DIESEL 340 770 29600
KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1097 29600
AMINI LAKSHADEEP THERMAL-DIESEL 265 509 29600
ANDROTT LAKSHADEEP THERMAL-DIESEL 219 524 29600
KALPENI LAKSHADEEP THERMAL-DIESEL 175 356 29600
AGATTI LAKSHADEEP THERMAL-DIESEL 195 658 29600
KADMAT LAKSHADEEP THERMAL-DIESEL 190 414 29600
KILTAN LAKSHADEEP THERMAL-DIESEL 150 269 29600
CHETLET LAKSHADEEP THERMAL-DIESEL 100 139 29600
BITRA LAKSHADEEP THERMAL-DIESEL 043 024 29600
BANGARAM LAKSHADEEP THERMAL-DIESEL 018 009 29600
Page 37
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) STATE SECTOR
Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 721811 46500
Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 50000 336142 46500
RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 237358 46500
RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 239926 46500
RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 124500 46500
SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 62109 46500
UPPER SILERU APGENCO HYDRO-HYDRO 24000 33000 46500
LOWER SILERU APGENCO HYDRO-HYDRO 46000 81066 46500
DONKARAI APGENCO HYDRO-HYDRO 2500 6007 46500
PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 1262 46500
CHETTIPETA APGENCO HYDRO-HYDRO 100 214 46500
MUCHKUND APGENCO HYDRO-HYDRO 12000 37571 46500
NAGARJUNASAGAR RCPH APGENCO HYDRO-HYDRO 9000 606 46500
TUNGABHADRA HES amp HAMPI(AP
Share)
APGENCO HYDRO-HYDRO 7200 6100 46500
KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 352232 42600
KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 288131 32500
KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 319272 46500
RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 40073 44300
KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 308317 46000
KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 308963 51300
SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 61004 76600
NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 17960 75300
PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 20873 58300
POCHAMPAD-I TSPGENCO HYDRO-HYDRO 2700 5455 29800
POCHAMPAD-II TSPGENCO HYDRO-HYDRO 900 1932 40700
NIZAMSAGAR TSPGENCO HYDRO-HYDRO 1000 1126 53400
RAICHUR TPS 1 to 7 KPCL THERMAL-COAL 147000 890866 43800
RAICHUR TPS 8 KPCL THERMAL-COAL 25000 159523 48200
BELLARI TPS 1 KPCL THERMAL-COAL 50000 318679 51100
BELLARI TPS 2 KPCL THERMAL-COAL 50000 232347 55600
BELLARI TPS 3 KPCL THERMAL-COAL 70000 47565 34400
BHADRA PH KPCL HYDRO-HYDRO 3920 2369 45900
GERUSUPPA PH KPCL HYDRO-HYDRO 24000 26990 22000
GHAT PRABHA HEP KPCL HYDRO-HYDRO 3200 4777 25300
KADRA HPS KPCL HYDRO-HYDRO 15000 16889 26800
NAGJHARI KPCL HYDRO-HYDRO 90000 155159 9800
KODASALLI DPH KPCL HYDRO-HYDRO 12000 14854 19200
MUNIRA+MGH+SPH+SPH KPCL HYDRO-HYDRO 22640 48211 7900
SHARAVATHY HPS KPCL HYDRO-HYDRO 108550 276215 5400
ALMATTI DPH KPCL HYDRO-HYDRO 29000 39611 24600
VARAHI UGPH KPCL HYDRO-HYDRO 46000 71368 15600
IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 17196 15300
IDUKKI HPS KSEB HYDRO-HYDRO 78000 137905 15300
KAKKAD HPS KSEB HYDRO-HYDRO 5000 13063 15300
KALLADA HPS KSEB HYDRO-HYDRO 1500 4436 15300
KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 46544 15300
KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 635 15300
LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 30822 15300
MALANKARA HPS KSEB HYDRO-HYDRO 1050 2474 15300
MATTUPETTY KSEB HYDRO-HYDRO 200 230 15300
MALAMPUZHA KSEB HYDRO-HYDRO 250 063 15300
CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 864 15300
URUMI ST I amp II KSEB HYDRO-HYDRO 615 903 15300
LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 248 15300
NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7765 19625 15300
PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 16601 15300
PANNIAR HPS KSEB HYDRO-HYDRO 3240 6217 15300
PORINGALKUTHU KSEB HYDRO-HYDRO 3600 10052 15300
PORINGALKUTHU LBE KSEB HYDRO-HYDRO 1600 9438 15300
PEPPARA KSEB HYDRO-HYDRO 300 395 15300
POOZHITHODE KSEB HYDRO-HYDRO 480 1045 15300
Page 38
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) PEECHI KSEB HYDRO-HYDRO 125 040 15300
RANI-PERUNADU KSEB HYDRO-HYDRO 400 585 15300
SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 79783 15300
SENGULAM HPS KSEB HYDRO-HYDRO 5120 11558 15300
SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 16711 15300
VILANGAD KSEB HYDRO-HYDRO 750 1578 15300
BARAPOLE KSEB HYDRO-HYDRO 1500 1932 15300
VELLATHOOVAL KSEB HYDRO-HYDRO 360 305 15300
CHIM0NY KSEB HYDRO-HYDRO 250 156 15300
ADYANPARA KSEB HYDRO-HYDRO 350 501 15300
BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 554 15300
KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 3801 15300
KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 23132 32800
ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 14416 62280
METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 523970 62280
METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 321270 62280
NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 336575 62280
NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 591240 62280
TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 508966 62280
KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 30897 62280
VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 18720 90699 62280
KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 33593 62280
BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 1047 62280
PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 1250 62280
PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 330 62280
MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 4897 62280
MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 032 62280
KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15681 62280
KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 40608 62280
KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 21342 62280
KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 4717 62280
KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4322 62280
KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2399 62280
METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 4416 62280
METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 8035 62280
BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2187 62280
BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2359 62280
BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2511 62280
BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 1949 62280
BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 1819 62280
POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 172 62280
SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 241 62280
MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 026 62280
THIRUMOORTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 136 62280
PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 9309 62280
VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 353 62280
SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 4192 62280
PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 6571 62280
SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 1186 62280
SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6319 62280
ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 6122 62280
KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 28674 62280
SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 18381 62280
SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 4258 62280
KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 12680 62280
KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4201 62280
ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 000 62280
PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 19175 62280
AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 078 62280
BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 504 62280
BHAVANI KATTALAI (BKB)(IIIampIII BB I amp II)TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 5847 62280
PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 000 62280
Page 39
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) SRI DAMODARAM STPS APPDCL THERMAL-COAL 160000 808108 36300
PRIVATE SECTOR
KARUPPUR TANJORE LANCO TANJORE PCL THERMAL-GAS 12000 48096 28770
SIMHAPURI ENERGY LTD SIMHAPURI ENERGY LTD THERMAL-COAL 60000 143900 39100
JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 7111 45500
SBU 1 JSW ENERGY LTD
VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 26000 159100
43300
SBU 2 JSW ENERGY LTD
VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 60000 247900
42800
LANCO KPLLANCO KONDAPALLI POWER
LTDTHERMAL-GAS 36814 85060
25776
LANCO KPL STG -IILANCO KONDAPALLI POWER
LTDTHERMAL-GAS 36600 12979
46330
LANCO KPL STG -IIIALANCO KONDAPALLI POWER
LTDTHERMAL-GAS 37100 85710
46330
LANCO KPL STG -III BLANCO KONDAPALLI POWER
LTDTHERMAL-GAS 37100 43639
46330
HINDUJA NATIONAL PCL HINDUJA NATIONAL PCL THERMAL-COAL 104000 303000 38200
MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 121164 49940
UDUPI POWER COR LTD ADANI POWER LTD THERMAL-COAL 120000 754613 42500
SPECTRUM POWER GENERATION
LTD SPECTRUM PG LTD THERMAL-GASN 20525 9256812
34952
TAQA NEYVELI POWER COM PVT
LTD TAQA NEYVELI THERMAL-LIG 25000 5840
34500
ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 251000 51000
ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 207860 36800
GMR VEMAGIRI POWER GENERATION
LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 30117
46450
EASTERN REGION
CENTRAL SECTOR
MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 64675 53113
MTPS STAGE - II KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 39000 1432 69138
BOKARO `B` TPS DVC THERMAL-COAL 63000 145670 31539
MEJIA TPS U 1-3 DVC THERMAL-COAL 63000 348298 31552
MEJIA TPS U 4 DVC THERMAL-COAL 21000 116099 34997
MEJIA TPS U 5-6 DVC THERMAL-COAL 50000 276427 35976
MEJIA TPS U 7-8 DVC THERMAL-COAL 100000 552854 36991
DURGAPUR STEEL TPS DVC THERMAL-COAL 100000 665550 39323
DURGAPUR TPS DVC THERMAL-COAL 21000 59270 35416
RAGHUNATHPUR TPS DVC THERMAL-COAL 120000 201650 35326
MAITHON HYDEL STA DVC HYDRO-HYDRO 6320 12200 17984
CHANDRAPURA TPSU1-3 DVC THERMAL-COAL 42000 257610 35095
CHANDRAPURA TPSU7-8 DVC THERMAL-COAL 50000 306673 34987
KODERMA TPS DVC THERMAL-COAL 100000 380180 38131
PANCHET HPS DVC HYDRO-HYDRO 8000 13360 17984
TILLAYA HPS DVC HYDRO-HYDRO 400 1410 17984
RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34700 35400
TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 277300 23200
TLDP -III NHPC LTD HYDRO-HYDRO 13200 55400 62000
TLDP -IV NHPC LTD HYDRO-HYDRO 16000 60300 25600
FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 957219 33700
FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 308943 41000
BONGAINGAON TPS NTPC LTD THERMAL-COAL 25000 153663 58600
KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 542277 34200
KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 942591 34200
BARH-II NTPC LTD THERMAL-COAL 132000 728021 44500
TALCHER TPS NTPC LTD THERMAL-COAL 46000 335521 30100
TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 702319 25600
TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1436521 24700
STATE SECTOR
BTPS(RampM) BIHAR STATE PGCL THERMAL-COAL 22000 12142 39700
BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 98331 10602
HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 50593 9482
CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 19689 2605
RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 53192 6033
UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 147208 14637
Page 40
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 60353 4519
IB TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 288567 25000
J P H GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 210 038 61100
MEYONG CHU GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 400 1086 61100
TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 122667 38200
DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 214339 43321
KOLAGHAT THERMAL POWER
STATION
WEST BENGAL PDCL THERMAL-COAL 126000 538269 31603
BAKRESHWAR THERMAL POWER
PLANT
WEST BENGAL PDCL THERMAL-COAL 105000 634876 32154
BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 45000 166855 33299
SANTHALDIH THERMAL POWER
STATION
WEST BENGAL PDCL THERMAL-COAL 50000 336442 34932
SAGARDIGHI THERMAL POWER
PROJECT
WEST BENGAL PDCL THERMAL-COAL 160000 423121 34705
JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 20344 68900
RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 24559 68900
TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 4623 68900
PURULIA PUMPED STORAGE
PROJECT
WEST BENGAL SEDCL HYDRO-HYDRO 90000 108816 68900
MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2768 68900
PRIVATE SECTOR
CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 49474 20230
CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 555500 70200
HALDIA ENERGY HALDIA ENERGY LTD THERMAL-COAL 60000 371000 50400
DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3688 63400
KAMALANGA TPS GMR KAMALANGA ENERGY LTD THERMAL-COAL 105000547670
33300
ADHUNIK POWER U-1 ADHUNIK POWER THERMAL-COAL 27000 158 44060
ADHUNIK POWER U-2 ADHUNIK POWER THERMAL-COAL 27000 168 44250
VL-JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 332800 23622
JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 43000 45250
JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 71700 37030
JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 70700 35920
JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 71100 38870
JOJOBERA UNIT 5 TATA POWER COM LTD THERMAL-COAL 12000 79300 44560
JOJOBERA UNIT 6 TATA POWER COM LTD THERMAL-WHR 12000 83700 12840
IEL KALINGANAGAR U-I TATA POWER COM LTD THERMAL-WG 6750 33400 22500
IEL KALINGANAGAR U-II TATA POWER COM LTD THERMAL-WG 6750 34800 22500
MAITHON UNIT 1 amp 2 TATA POWER COM LTD THERMAL-COAL 105000 678000 36100
HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 27500 24340
HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 28400 24340
HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 15800 24310
NORTH EASTERN REGION
CENTRAL SECTOR
LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 74100 36600
AGARTALA GT NEEPCO THERMAL-GAS 13500 88611 27210
ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 153111 32310
DOYANG HEP NEEPCO HYDRO-HYDRO 7500 25598 49801
KOPILI HEP NEEPCO HYDRO-HYDRO 20000 98186 11491
KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 19582 20237
KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 10310 17968
RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 124093 22945
TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 10100 17344 39000
STATE SECTOR
HYDRO POWER (122 Stns) ITANAGAR GOVT OF ARUNACHAL
PRADESHHYDRO-HYDRO 6971 6217270
24600
KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39514 17337
LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 82327 36810
NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 33318 48290
MYNTRIANG SHEP ST II ASSAM POWER GENCO HYDRO-HYDRO 300 567 35776
LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 9130 49200
LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 012 49200
DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 022 49200
TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 000 49200
UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 4990 16000
UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 6476 37000
UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 16494 14600
UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 3600 9556 15000
SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 758 8000
MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44070 44800
KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 154 41400
TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 091 41400
MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 411 41400
MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 394 41400
KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 760 41400
SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 3264 41400
LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 044 41400
BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 18953 28000
ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 43585 28200
GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 4080 11100
Note
LIG Lignite N Naptha WHR Waste Heat Recovery
Page 41
(As on 30042019)
Coal Lignite Gas Diesel Total
State 000 000 32821 000 32821 000 10000 501 43322
Private 000 000 2450 000 2450 000 000 2650 5100
Central 40852 000 43556 000 84408 000 35708 2500 122616
Sub-Total 40852 000 78827 000 119679 000 45708 5651 171038
State 000 000 000 000 000 000 000 10711 10711
Private 000 000 000 000 000 000 000 2939 2939
Central 3705 000 4682 000 8387 000 11655 000 20042
Sub-Total 3705 000 4682 000 8387 000 11655 13650 33692
State 000 000 000 000 000 000 32200 3253 35453
Private 000 000 000 000 000 000 000 012 012
Central 4560 000 10969 000 15529 000 7227 000 22756
Sub-Total 4560 000 10969 000 15529 000 39427 3265 58221
State 000 000 16950 000 16950 000 000 1601 18551
Private 000 000 000 000 000 000 000 009 009
Central 5610 000 43695 000 49305 000 6849 500 56654
Sub-Total 5610 000 60645 000 66255 000 6849 2110 75214
State 000 000 000 3600 3600 000 000 545 4145
Private 000 000 000 000 000 000 000 344 344
Central 4710 000 7157 000 11867 000 9534 000 21401
Sub-Total 4710 000 7157 3600 15467 000 9534 889 25890
State 000 000 000 000 000 000 000 3067 3067
Private 000 000 000 000 000 000 000 100 100
Central 3210 000 4893 000 8103 000 5733 000 13836
Sub-Total 3210 000 4893 000 8103 000 5733 3167 17003
State 000 000 000 000 000 000 000 3647 3647
Private 000 000 000 000 000 000 000 050 050
Central 3105 000 4046 000 7151 000 9794 000 16945
Sub-Total 3105 000 4046 000 7151 000 9794 3697 20642
11250 000 6362 000 17612 000 14000 000 31612
State 000 000 49771 3600 53371 000 42200 23325 118895
Private 000 000 2450 000 2450 000 000 6104 8554
Central 77002 000 125360 000 202362 000 100500 3000 305862
Grand Total 77002 000 177581 3600 258183 000 142700 32429 433311
Assam
Arunachal Pradesh
Meghalaya
Tripura
Manipur
Nagaland
Mizoram
Central - Unallocated
Total (North-
Eastern Region)
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
NORTH-EASTERN REGION
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
State Ownership Sector
Mode wise breakup
Grand TotalThermalNuclear Hydro
RES
(MNRE)
(As on 30042019)
Coal Lignite Gas Diesel Total
State 000 000 000 4005 4005 000 000 525 4530
Private 000 000 000 000 000 000 000 663 663
Central 000 000 000 000 000 000 000 510 510
Sub-Total 000 000 000 4005 4005 000 000 1698 5703
State 000 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 000 075 075
Central 000 000 000 000 000 000 000 000 000
Sub-Total 000 000 000 000 000 000 000 075 075
State 000 000 000 4005 4005 000 000 525 4530
Private 000 000 000 000 000 000 000 738 738
Central 000 000 000 000 000 000 000 510 510
Grand Total 000 000 000 4005 4005 000 000 1773 5778
Andaman amp
Nicobar
Lakshadweep
Total (Islands)
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
ISLANDS
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
State Ownership Sector
Mode wise breakup
Grand TotalThermalNuclear Hydro
RES
(MNRE)
SrNo Contents Page
1 Executive summary of Target and Achievement of Transmission Lines during 2019-20
20(1)
2 List of Transmission Lines CommissionedReady for commissioning during Apr-2019 20(2)
Section C - Transmission Lines
1 Executive summary of Target and Achievement of Transmission Lines during 2019-20 As on 30-04-19
(All figures in circuit kms)
Ce
ntr
al S
ecto
r
Sta
te S
ecto
r
JV
Pri
va
te S
ecto
r
To
tal
Ce
ntr
al S
ecto
r
Sta
te S
ecto
r
JV
Pri
va
te S
ecto
r
To
tal
Ce
ntr
al S
ecto
r
Sta
te S
ecto
r
JV
Pri
va
te S
ecto
r
To
tal
Ce
ntr
al S
ecto
r
Sta
te S
ecto
r
JV
Pri
va
te S
ecto
r
To
tal
Ce
ntr
al S
ecto
r
Sta
te S
ecto
r
JV
Pri
va
te S
ecto
r
To
tal
Ce
ntr
al
Se
cto
r
Sta
te S
ec
tor
JV
Pri
va
te S
ec
tor
Gra
nd
To
tal
0 0 0 0 0 0 0 0 2727 958 2334 6019 2239 3416 1143 6798 781 10023 0 10804 5747 14397 3477 23621
Apr19 Programme 0 0 0 0 0 0 0 0 577 416 557 1550 60 890 203 1153 0 309 0 309 637 1615 760 3012
Achievement 0 0 0 0 0 0 0 0 53 0 0 53 0 20 0 20 0 401 0 401 53 421 0 474
Upto Apr-19 Programme 0 0 0 0 0 0 0 0 577 416 557 1550 60 890 203 1153 0 309 0 309 637 1615 760 3012
Achievement 0 0 0 0 0 0 0 0 53 0 0 53 0 20 0 20 0 401 0 401 53 421 0 474
20(1)
220 kV Grand Total 800 kV 500 kV
Programme 2019-20
Programme
Achievement
HVDC765 kV 400 kV
Line
1 2 3 4 5 6
1 400 Bhadla (PG) - Bhadla (RVPN) line DC PGCIL 53
53
2 400 LILO of one ckt Jhanor - Navsari at Vav Ss DC GETCO 20
3 220 Banda-Chitrakoot Line DC UPPTCL 226
4 220 Gorakhpur (PG)-Gola line DC UPPTCL 82
5 220 Hapur(765) - Faridnagar line SC UPPTCL 11
6 220 Kalikiri - Madanapalli line DC APTRANSCO 60
7 220LILO of Gr Noida -Noida Sec-129 at Noida
Sec-148DC UPPTCL 1
8 220LILO of one Ckt of Badshahpur Pali at Sec-
65 GurgaonDC HVPNL 3
9 220 Sultanpur-Sangipur LILO Section at Amethi DC UPPTCL 18
421
0
474
20(2)
Grand Total
2Transmission Lines (220 kV and above) CommissionedReady for commissioning During Apr-2019
Voltage
Level (kV)Name of Transmission Lines
Circuit
Type
Executing
Agency
CENTRAL SECTOR
Total of CENTRAL SECTOR
STATE SECTOR Sector
Total of STATE SECTOR
PRIVATE SECTOR
Total of PRIVATE SECTOR
SlNo
Length(CKm)
As on 30-04-19
SN Contents Page
1 Executive summary of Target and Achievement of Substations during 2019-20 21(1)
2Sub Stations (220 kV and above) commissionedready for commisssioning during Apr-
201921(2)
Section D - Sub Stations
1 Executive summary of Target and Achievement of Substations during 2019-2020 As on 30-04-19
(All figures in circuit MVA)
Ce
ntr
al S
ecto
r
Sta
te S
ecto
r
JV
Pri
va
te S
ecto
r
To
tal
Ce
ntr
al S
ecto
r
Sta
te S
ecto
r
JV
Pri
va
te S
ecto
r
To
tal
Ce
ntr
al S
ecto
r
Sta
te S
ecto
r
JV
Pri
va
te S
ecto
r
To
tal
Ce
ntr
al S
ecto
r
Sta
te S
ecto
r
JV
Pri
va
te S
ecto
r
To
tal
Ce
ntr
al S
ecto
r
Sta
te S
ecto
r
JV
Pri
va
te S
ecto
r
To
tal
Ce
ntr
al S
ec
tor
Sta
te S
ec
tor
JV
Pri
va
te S
ec
tor
Gra
nd
To
tal
3000 0 0 3000 0 0 0 0 18000 3000 6000 27000 5205 19665 4260 29130 800 21786 0 22586 27005 44451 10260 81716
Apr19 Programme 0 0 0 0 0 0 0 0 3000 0 3000 6000 0 1000 2000 3000 0 800 0 800 3000 1800 5000 9800
Achievement 0 0 0 0 0 0 0 0 500 0 0 500 815 1980 0 2795 0 1305 0 1305 1315 3285 0 4600
Upto Apr-19 Programme 0 0 0 0 0 0 0 0 3000 0 3000 6000 0 1000 2000 3000 0 800 0 800 3000 1800 5000 9800
Achievement 0 0 0 0 0 0 0 0 500 0 0 500 815 1980 0 2795 0 1305 0 1305 1315 3285 0 4600
21(1)
220 kV Grand Total 800 kV 500 kV
Programme 2019-20
Programme
Achievement
HVDC765 kV 400 kV
As on 30-04-19
Sl Voltage Ratio Capacity
No (kVkV) (MWMVA)
1 2 3 4 5
1 Bhadla SS (3x1500 3x500 MVA) 765400 PGCIL 500
2 Extn at Tumkur (Pavagada ) PS (2x500 MVA) 400220 PGCIL 500
3 Bongaigaon (2nd ICT) Ss 400220 PGCIL 315
Total of CENTRAL SECTOR 1315
4 Motiram Adda Gorakhpur (Aug) (Additional TF) 400220 UPPTCL 240
5 Muradnagar-II Ghaziabad (Aug) (Additional TF) 400220 UPPTCL 240
6 Noida Sec- 148 GBNagar (New) 400220 UPPTCL 5007 Sarnath Varanasi (Aug) TF- II (500-315) 400220 UPPTCL 1858 Sarojininagar Lucknow Aug) TF- II (500-315) 400220 UPPTCL 185
9 Unnao (Aug) TF-III 400220 UPPTCL 31510 Nawada SS 400220 HVPNL 31511 Kharepatan SS 22033 MSETCL 2512 Prathipadu SS 220132 APTRANSCO 10013 Pali Ss 22066 HVPNL 160
14 A-5 Faridabad Ss 22066 HVPNL 60
15 Rentachintala Ss Aug(3X100-2x100) 220132 APTRANSCO 10016 Amethi Ss 220132 UPPTCL 160
17 Gajokhar Varanasi (Aug) TF- II (160-100) 220132 UPPTCL 60
18 Gola Gorakhpur (New) 220132 UPPTCL 160
19 Khurja Bulandshahr (Aug) TF- II (200-160) 220132 UPPTCL 40
20 RC Green GB Nagar (Aug) TF-II (160-100) 220132 UPPTCL 60
21 Sikandrabad Bulandshahr (Aug) (Additional TF) 220132 UPPTCL 160
22 Sitapur (Aug) (Additional TF) 220132 UPPTCL 160
23 Sohawal Ayodhya (Aug) TF-II (160-100) 220132 UPPTCL 60
TOTAL STATE SECTOR 3285
GRAND TOTAL 4600
21(2)
CENTRAL SECTOR
STATE SECTOR
2Sub-Stations (220 kV and above) CommissionedReady for commissioning During Apr-2019
Name of Sub Stations Executing Agency
SN Contents Page
1 Electricity Generation (MU) Targets and Achievements for 2019-20 22
Section E - Electricity Generation
Programme Achievement Ach Programme Achievement Ach
Central Sector 37545100 3177900 3129530 9848 3177900 3129530 9848
State Sector 37498600 3322500 2950558 8881 3322500 2950558 8881
PvtIPP Sector 37346200 3236400 3195940 9875 3236400 3195940 9875
PvtUTL Sector 1823100 159300 165579 10394 159300 165579 10394
Total 114213000 9896100 9441607 9541 9896100 9441607 9541
Central Sector 5661700 386100 481390 12468 386100 481390 12468
State Sector 6680500 498200 536514 10769 498200 536514 10769
PvtIPP Sector 1206900 57300 80405 14032 57300 80405 14032
PvtUTL Sector 144100 12300 10930 8886 12300 10930 8886
Total 13693200 953900 1109239 11628 953900 1109239 11628
Central Sector 4472000 367300 317765 8651 367300 317765 8651
Total 4472000 367300 317765 8651 367300 317765 8651
Bhutan Import 621800 17500 24396 13941 17500 24396 13941
Central Sector 47678800 3931300 3928685 9993 3931300 3928685 9993
State Sector 44179100 3820700 3487072 9127 3820700 3487072 9127
Pvt Sector 40520300 3465300 3452854 9964 3465300 3452854 9964
Total 133000000 11234800 10893007 9696 11234800 10893007 9696
Provisional based on actual-cum-Assesment
Figs in MU
Cummulative
Achievement
Cummulative
Achievement
Mar-19 Mar-18 Upto Mar-2019 Upto Mar-2018
984785 869291 12675910 10183949
22
1 Electricity Generation (MU) Targets and Achievememts for 2019-20
All India Energy Generation During Apr-19 to Apr-19 (MU)
Target (2019-20)Apr-19 to Apr-19
Sector
Hydro
Thermal
Nuclear
Renewable Energy Generation
Achievement
Apr-2019
98961
95393673
112348
94416
11092
3178
108930
0
20000
40000
60000
80000
100000
120000
Thermal Hydro Nuclear Total
Programme
Achievement
SN Contents Page
1 Energy Power Supply Position (Provisional) for Apr-2019 and during Apr-19 to Apr-19 23
2 Peak Power Supply Position (Provisional) for Apr-2019 and during Apr-19 to Apr-19 24
3 Energy Power Supply Position (Revised) for Mar-2019 and during Apr-19 to Mar-19 25
4 Peak Power Supply Position (Revised) for Mar-2019 and during Apr-19 to Mar-19 26
5 Notified Power cuts Restrictions on Industries during Apr-2019 27
6 Power Supply to Agricultural Sector during Apr-2019 28
Section F - Power supply position
आकड़ मममलयन यननट नट Figures in MU net
ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied
कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )
चडीगढ़ Chandigarh 117 117 0 00 117 117 0 00
दिलली Delhi 2698 2698 1 00 2698 2698 1 00
हरियजणज Haryana 3773 3773 0 00 3773 3773 0 00
दहमजचल परिश Himachal Pradesh 777 777 0 00 777 777 0 00
रमम कशमीि Jammu amp Kashmir 1604 1296 308 192 1604 1296 308 192
परजब Punjab 3646 3646 0 00 3646 3646 0 00
िजरसथजन Rajasthan 6210 6208 2 00 6210 6208 2 00
उतति परिश Uttar Pradesh 10179 10148 32 03 10179 10148 32 03
उततिजखड Uttarakhand 1120 1120 0 00 1120 1120 0 00
उततरी कषतर Northern Region 30094 29786 308 10 30094 29786 308 10
छततीसगढ़ Chhattisgarh 2684 2676 8 03 2684 2676 8 03
गरिजत Gujarat 10718 10718 0 00 10718 10718 0 00
मधय परिश Madhya Pradesh 6006 6006 0 00 6006 6006 0 00
महजिजषटर Maharashtra 14308 14308 0 00 14308 14308 0 00
िमन औि दिउ Daman amp Diu 220 220 0 00 220 220 0 00
िजिि व नगि हवली Dadra amp Nagar Haveli 552 552 0 00 552 552 0 00
गोवज Goa 388 388 0 00 388 388 0 00
पशचिमी कषतर Western Region 34875 34868 8 00 34875 34868 8 00
आनधर परिश Andhra Pradesh 5708 5708 0 00 5708 5708 0 00
तलगजनज Telangana 5725 5725 0 00 5725 5725 0 00
कनजाटक Karnataka 7003 7003 0 00 7003 7003 0 00
किल Kerala 2402 2400 2 01 2402 2400 2 01
तममल नजड Tamil Nadu 10010 10010 0 00 10010 10010 0 00
पडचिी Puducherry 263 263 0 00 263 263 0 00
लकष-दवीप Lakshadweep 4 4 0 0 4 4 0 0
दकषकषणी कषतर Southern Region 31111 31109 2 00 31111 31109 2 00
बबहजि Bihar 2589 2589 0 00 2589 2589 0 00
िजमोिि घजटी ननगम DVC 1772 1772 0 00 1772 1772 0 00
झजिखणड Jharkhand 689 689 0 00 689 689 0 00
ओडडशज Odisha 2689 2689 1 00 2689 2689 1 00
पशशचम बगजल West Bengal 5075 5075 0 00 5075 5075 0 00
मसशककम Sikkim 37 37 0 00 37 37 0 00
अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 7 29 27 2 7
परवी कषतर Eastern Region 12851 12850 1 00 12851 12850 1 00
अरणजचल परिश Arunachal Pradesh 66 66 0 05 66 66 0 05
असम Assam 766 709 57 75 766 709 57 75
मणणपि Manipur 68 67 1 15 68 67 1 15
मघजलय Meghalaya 170 160 10 59 170 160 10 59
ममज़ोिम Mizoram 54 53 0 08 54 53 0 08
नजगजलड Nagaland 54 54 0 08 54 54 0 08
बिपिज Tripura 122 120 1 12 122 120 1 12
उततर-परवी कषतर North-Eastern Region 1300 1228 71 55 1300 1228 71 55
समपणण भारत All India 110231 109842 389 04 110231 109842 389 04
23
ऊरजा पनत ा म कमी ऊरजा पनत ा म कमीEnergy not Supplied
Excludes energy exported to Bangladesh
Energy not Supplied
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
ऊराण वरवदयत आपरत ण शथिरत ररपोरण (परवाणरवलोकन) Energy Power Supply Position Report (Provisional)
राजयState
अपरल 2019 April2019 अपरल2019 -अपरल2019 April2019 to April2019
अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met
कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )
चडीगढ़ Chandigarh 256 256 0 00 256 256 0 00
दिलली Delhi 5664 5664 0 00 5664 5664 0 00
हरियजणज Haryana 8127 8127 0 00 8127 8127 0 00
दहमजचल परिश Himachal Pradesh 1387 1387 0 00 1387 1387 0 00
रमम कशमीि Jammu amp Kashmir 2826 2261 565 200 2826 2261 565 200
परजब Punjab 7015 7015 0 00 7015 7015 0 00
िजरसथजन Rajasthan 10560 10560 0 00 10560 10560 0 00
उतति परिश Uttar Pradesh 19935 19935 0 00 19935 19935 0 00
उततिजखड Uttarakhand 1922 1922 0 00 1922 1922 0 00
उततरी कषतर Northern Region 54476 53985 491 09 54476 53985 491 09
छततीसगढ़ Chhattisgarh 4596 4574 22 05 4596 4574 22 05
गरिजत Gujarat 17871 17865 6 00 17871 17865 6 00
मधय परिश Madhya Pradesh 10018 10018 0 00 10018 10018 0 00
महजिजषटर Maharashtra 23158 23150 8 00 23158 23150 8 00
िमन औि दिउ Daman amp Diu 341 340 1 02 341 340 1 02
िजिि व नगि हवली Dadra amp Nagar Haveli 818 818 0 00 818 818 0 00
गोवज Goa 594 594 0 00 594 594 0 00
पशचिमी कषतर Western Region 56242 56222 20 00 56242 56222 20 00
आनधर परिश Andhra Pradesh 9151 9151 0 00 9151 9151 0 00
तलगजनज Telangana 10191 10191 0 00 10191 10191 0 00
कनजाटक Karnataka 12681 12681 0 00 12681 12681 0 00
किल Kerala 4309 4300 8 02 4309 4300 8 02
तममल नजड Tamil Nadu 15972 15972 0 00 15972 15972 0 00
पडचिी Puducherry 482 480 2 05 482 480 2 05
लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0
दकषकषणी कषतर Southern Region 49155 49103 52 01 49155 49103 52 01
बबहजि Bihar 5357 5357 0 00 5357 5357 0 00
िजमोिि घजटी ननगम DVC 3039 3039 0 00 3039 3039 0 00
झजिखणड Jharkhand 1266 1266 0 00 1266 1266 0 00
ओडडशज Odisha 5389 5389 0 00 5389 5389 0 00
पशशचम बगजल West Bengal 8666 8666 0 00 8666 8666 0 00
मसशककम Sikkim 100 100 0 00 100 100 0 00
अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7
परवी कषतर Eastern Region 23349 23349 0 00 23349 23349 0 00
अरणजचल परिश Arunachal Pradesh 139 136 3 22 139 136 3 22
असम Assam 1712 1667 45 26 1712 1667 45 26
मणणपि Manipur 197 188 9 46 197 188 9 46
मघजलय Meghalaya 336 336 0 00 336 336 0 00
ममज़ोिम Mizoram 116 113 3 26 116 113 3 26
नजगजलड Nagaland 157 131 26 166 157 131 26 166
बिपिज Tripura 292 291 1 03 292 291 1 03
उततर-परवी कषतर North-Eastern Region 2848 2780 68 24 2848 2780 68 24
समपणण भारत All India 177411 176810 601 03 177411 176810 601 03
24
मजग की पनत ा म कमी Demand not Met
Excludes the supply to Bangladesh
राजयStateअपरल 2019 April2019
मजग की पनत ा म कमी Demand not Met
अधिकतम वरवदयत आपरत ण शथिरत ररपोरण (परवाणरवलोकन) Peak Power Supply Position Report (Provisional)
आकड़ मगज वजट नट Figures in MW netअपरल2019 -अपरल2019 April2019 to April2019
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
आकड़ मममलयन यननट नट Figures in MU net
ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied
कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )
चडीगढ़ Chandigarh 96 96 0 00 1561 1561 0 00
दिलली Delhi 1931 1930 1 00 32299 32282 17 01
हरियजणज Haryana 3658 3658 0 00 53665 53665 0 00
दहमजचल परिश Himachal Pradesh 832 830 2 02 9850 9618 232 24
रमम कशमीि Jammu amp Kashmir 1767 1414 353 200 19593 15868 3725 190
परजब Punjab 3585 3585 0 00 55288 55275 13 00
िजरसथजन Rajasthan 6774 6770 4 01 79826 79637 189 02
उतति परिश Uttar Pradesh 8754 8691 63 07 117101 116118 984 08
उततिजखड Uttarakhand 1067 1067 0 00 13845 13753 92 07
उततरी कषतर Northern Region 28464 28041 423 15 383028 377776 5251 14
छततीसगढ़ Chhattisgarh 2464 2457 8 03 26130 26076 54 02
गरिजत Gujarat 9890 9890 0 00 116588 116572 15 00
मधय परिश Madhya Pradesh 6236 6236 0 00 75667 75665 2 00
महजिजषटर Maharashtra 13631 13631 0 00 158285 158148 137 01
िमन औि दिउ Daman amp Diu 221 221 0 00 2557 2557 0 00
िजिि व नगि हवली Dadra amp Nagar Haveli 553 553 0 00 6317 6317 0 00
गोवज Goa 362 362 0 00 4283 4280 3 01
पशचिमी कषतर Western Region 33357 33349 8 00 389827 389615 212 01
आनधर परिश Andhra Pradesh 6072 6071 1 00 63735 63677 58 01
तलगजनज Telangana 6930 6929 1 00 66697 66635 62 01
कनजाटक Karnataka 7614 7612 1 00 71759 71690 69 01
किल Kerala 2489 2488 1 00 25029 24911 118 05
तममल नजड Tamil Nadu 10247 10245 2 00 109375 109273 102 01
पडचिी Puducherry 252 251 1 04 2761 2751 10 03
लकष-दवीप Lakshadweep 4 4 0 0 46 46 0 0
दकषकषणी कषतर Southern Region 33605 33597 8 00 339355 338938 417 01
बबहजि Bihar 2319 2318 1 00 30052 29827 225 07
िजमोिि घजटी ननगम DVC 1773 1772 1 00 22365 21995 369 17
झजिखणड Jharkhand 698 697 1 01 8682 8461 221 25
ओडडशज Odisha 2583 2582 1 00 31810 31781 30 01
पशशचम बगजल West Bengal 4585 4584 2 00 52237 52078 159 03
मसशककम Sikkim 41 41 0 00 513 512 0 01
अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 67 346 323 23 67
परवी कषतर Eastern Region 11999 11995 5 00 145658 144654 1004 07
अरणजचल परिश Arunachal Pradesh 61 60 0 06 864 855 9 10
असम Assam 680 656 23 34 9532 9204 328 34
मणणपि Manipur 68 68 1 09 916 906 10 11
मघजलय Meghalaya 173 173 0 03 1955 1953 1 01
ममज़ोिम Mizoram 50 49 0 09 668 661 8 12
नजगजलड Nagaland 58 57 1 20 902 809 93 103
बिपिज Tripura 150 150 0 00 1859 1837 21 11
उततर-परवी कषतर North-Eastern Region 1240 1214 26 21 16696 16225 471 28
समपणण भारत All India 108665 108196 469 04 1274564 1267209 7355 06
Note The revised data for March 2019 is not avaliable
Excludes energy exported to Bangladesh
राजयState
ऊराण वरवदयत आपरत ण शथिरत ररपोरण (परवाणरवलोकन) Energy Power Supply Position Report (Provisional)
25
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
Energy not Supplied Energy not Supplied
मािण2019 March2019 अपरल2018 -मािण2019 April2018 to March2019
ऊरजा पनत ा म कमी ऊरजा पनत ा म कमी
अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met
कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )
चडीगढ़ Chandigarh 223 223 0 00 369 369 0 00
दिलली Delhi 4016 4016 0 00 7016 7016 0 00
हरियजणज Haryana 6544 6544 0 00 10270 10270 0 00
दहमजचल परिश Himachal Pradesh 1683 1683 0 00 1700 1700 0 00
रमम कशमीि Jammu amp Kashmir 3277 2622 655 200 3277 2622 655 200
परजब Punjab 6564 6564 0 00 12638 12638 0 00
िजरसथजन Rajasthan 11885 11885 0 00 13276 13276 0 00
उतति परिश Uttar Pradesh 16220 16220 0 00 20498 20062 436 21
उततिजखड Uttarakhand 2002 2002 0 00 2216 2216 0 00
उततरी कषतर Northern Region 47925 47356 569 12 63166 61726 1440 23
छततीसगढ़ Chhattisgarh 4444 4128 316 71 4444 4270 174 39
गरिजत Gujarat 16263 16263 0 00 17053 16963 90 05
मधय परिश Madhya Pradesh 12328 12323 5 00 13815 13815 0 00
महजिजषटर Maharashtra 22361 22291 70 03 23864 23254 610 26
िमन औि दिउ Daman amp Diu 336 336 0 01 357 356 1 02
िजिि व नगि हवली Dadra amp Nagar Haveli 800 799 1 01 816 815 1 01
गोवज Goa 538 538 0 00 596 596 0 00
पशचिमी कषतर Western Region 53132 52965 167 03 56675 55821 853 15
आनधर परिश Andhra Pradesh 8977 8977 0 00 9459 9453 6 01
तलगजनज Telangana 10471 10471 0 00 10815 10815 0 00
कनजाटक Karnataka 12841 12841 0 00 12841 12841 0 00
किल Kerala 4264 4228 36 09 4264 4228 36 09
तममल नजड Tamil Nadu 15712 15712 0 00 15712 15712 0 00
पडचिी Puducherry 427 412 15 34 427 412 15 34
लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0
दकषकषणी कषतर Southern Region 49464 49464 0 00 49464 49464 0 00
बबहजि Bihar 4633 4633 0 00 5115 5084 31 06
िजमोिि घजटी ननगम DVC 3035 3035 0 00 3035 3035 0 00
झजिखणड Jharkhand 1210 1210 0 00 1339 1291 48 36
ओडडशज Odisha 4827 4827 0 00 5357 5357 0 00
पशशचम बगजल West Bengal 8287 8287 0 00 9130 9123 7 01
मसशककम Sikkim 100 100 0 00 106 106 0 00
अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7
परवी कषतर Eastern Region 21658 21658 0 00 23141 22733 408 18
अरणजचल परिश Arunachal Pradesh 133 131 2 15 138 138 0 01
असम Assam 1539 1508 31 20 1865 1809 56 30
मणणपि Manipur 204 199 5 25 219 216 3 12
मघजलय Meghalaya 357 357 0 00 374 372 1 04
ममज़ोिम Mizoram 108 105 3 28 121 119 2 17
नजगजलड Nagaland 127 125 2 16 156 138 18 116
बिपिज Tripura 249 249 0 00 298 293 5 17
उततर-परवी कषतर North-Eastern Region 2540 2535 5 02 2967 2850 117 39
समपणण भारत All India 169464 168745 719 04 177022 175528 1494 08
Note The revised data for March 2019 is not avaliable 26
अधिकतम वरवदयत आपरत ण शथिरत ररपोरण (परवाणरवलोकन) Peak Power Supply Position Report (Provisional)
आकड़ मगज वजट नट Figures in MW net
राजयStateमािण2019 March2019 अपरल2018 -मािण2019 April2018 to March2019
मजग की पनत ा म कमी मजग की पनत ा म कमी Demand not MetDemand not Met
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
Excludes the supply to Bangladesh
अपरल 2019 April2019 अपरल2018 -मािण2019 April2019 to April2019
उततरी कषतर Northern Region
चडीगढ़ Chandigarh(Data Not Received)दिलली Delhi
हरियजणज Haryana
दहमजचल परिश Himachal Pradeshरमम कशमीि Jammu amp Kashmir(Data
Not Received)परजब Punjab
िजरसथजन Rajasthanउतति परिश Uttar Pradesh
उततिजखड Uttarakhand
पशचिमी कषतर Western Region
छततीसगढ़ Chhattisgarh
Apr-Nov 2018- No cuts
Maximum Demand cut-58MW
Energy cut- 00020-00032 MUsday
गरिजत Gujarat
मधय परिश Madhya Pradesh
महजिजषटर Maharashtra
गोवज Goa
दकषकषणी कषतर Southern Region
आनधर परिश Andhra Pradesh
तलगजनज Telangana
कनजाटक Karnataka
किल Kerala
तममल नजड Tamil Nadu
पडचिी Puducherryपरवी कषतर Eastern Region
बबहजि Bihar
झजिखणड Jharkhand
ओडडशज Odisha
पशशचम बगजल West Bengal
No N
otifie
d Cu
ts
27
मािण 2019 म इडथरीर पर वरवदयत करौती का वरवरवरण Notified Power CutsRestrictions on Industries during April2019
राजय कषतर State Regionऊराणमाग करौती EnergyDemand Cut
No N
otifie
d Cu
tsNo
Notifie
d Cu
ts
अपरल2019 April 2019 अपरल2019 -अपरल2019 April2019 to April2019
उततरी कषतर Northern Region
चडीगढ़ Chandigarh Data not received Data not received
दिलली Delhi Data not received Data not received
हरियजणज Haryana 0811 hrsday 0811 hrsday
दहमजचल परिश Himachal Pradesh HPSEBL has only 2 agriculture consumers and uninterrupted
power is being supplied to agriculture sector
HPSEBL has only 2 agriculture consumers and uninterrupted
power is being supplied to agriculture sector
रमम कशमीि Jammu amp Kashmir Data not received Data not received
परजब Punjab 379 hrsday 379 hrsday
िजरसथजन Rajasthan 0630 hrsday 0630 hrsday
उतति परिश Uttar Pradesh 2157 hrsday 2157 hrsday
उततिजखड Uttarakhand 2359 hrsday 2359 hrsday
पशचिमी कषतर Western Region
छततीसगढ़ Chhattisgarh 18 hrsday 18 hrsday
गरिजत Gujarat 8 hrsday 8 hrsday
मधय परिश Madhya Pradesh Three-Phase Supply(Irrigation)- 0953 hrs day Three-Phase
(Mixed) Supply - 2334 hrs day
Three-Phase Supply(Irrigation)- 0953 hrs day Three-Phase
(Mixed) Supply - 2334 hrs day
महजिजषटर Maharashtra Three-Phase Supply(Irrigation)- 9 hrs day Three-Phase Supply(Irrigation)- 9 hrs day
गोवज Goa No restriction No restriction
दकषकषणी कषतर Southern Region
आनधर परिश Andhra Pradesh 07 hrsday 07 hrsday
तलगजनज Telangana 24 hrsday 24 hrsday
कनजाटक Karnataka 6 hrsday 6 hrsday
किल Kerala No Restrictions No Restrictions
तममल नजड Tamil Nadu 9 hrsday (6 hrs during day time and 3 hrs during night time) 9 hrsday (6 hrs during day time and 3 hrs during night time)
पडचिी Puducherry No Restrictions No Restrictions
परवी कषतर Eastern Region
बबहजि Bihar 18 hrsday 18 hrsday
झजिखणड Jharkhand 20 hrsday 20 hrsday
ओडडशज Odisha 24 hrsday 24 hrsday
पशशचम बगजल West Bengal 23 hrsday 23 hrsday
28
मारच 2019 कषि कषतर को षिदयत आपरतच का षििरण Power Supply to Agricultural Sector during March2019
राजय कषतर State Regionऔसत वरवदयत आपरत ण घनरो म Average Hours of Supply
On segregated feeders
SNo Contents Page
1 Growth of Installed Capacity since 6th Plan 29
2 Progress of Transmission Sector since 6th Plan 30
3 All India Yearly Coal consumption for Power Generation (Utilities)
4 All India Annual Per Capita Consumption of Electricity since -2006
5 Average cost of power supply amp Average realisation (Paisakwh)
6 Growth of Rural Electrification amp Pump Sets Energisation
7 Status of Hydro Schemes Cleared by the CEA in Apr-2019
Section G - Growth of Power Sector
31
32
(In MW)
Coal Gas Diesel Total
End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472
End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634
End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537
End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596
End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921
End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703
End of 12th Plan 19216288 2532938 83763 21832988 6780 4447842 50018 31960630
Up to Apr-2019 20070450 2493722 63763 22627934 678000 4539922 7764163 35610019
Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-17) = 51529 MW
Electricity Generation (MU) Targets and Achievements for 2016-17
Coal Gas Diesel Nuclear Hydro Res Total
2007045 2493722 637629 678000 453992 77641625 22925174
29
1 Growth of Installed Capacity Since 6th Plan
Plan YearThermal
Nuclear Hydro RES (MNRE) Total
2007045
2493722637629
678000
4539922
77641625
Total Installed Capacity 35610019 MW
Coal Gas Diesel Nuclear Hydro Res
Progress of Transmission Sector in the Country up to April 2019
1 TRANSMISSION LINES (All fig in CKM)
At the end of
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
6th plan 0 0 0 0 0 0 0 0 0 0 0 0 1831 4198 0 6029 1641 44364 0 46005 3472 48562 0 52034
7th plan 0 0 0 0 0 0 0 0 0 0 0 0 13068 6756 0 19824 4560 55071 0 59631 17628 61827 0 79455
8th plan 0 0 0 0 1634 0 0 1634 0 0 0 0 23001 13141 0 36142 6564 73036 0 79600 31199 86177 0 117376
9th plan 0 0 0 0 3234 1504 0 4738 751 409 0 1160 29345 20033 0 49378 8687 88306 0 96993 42017 110252 0 152269
10th plan 0 0 0 0 4368 1504 0 5872 1775 409 0 2184 48708 24730 0 73438 9444 105185 0 114629 64295 131828 0 196123
11th Plan 0 0 0 0 5948 1504 1980 9432 4839 411 0 5250 71023 30191 5605 106819 10140 125010 830 135980 91950 157116 8415 257481
12th Plan 6124 0 0 6124 5948 1504 1980 9432 25465 1177 4598 31240 92482 48240 17065 157787 11014 151276 978 163268 141033 202197 24621 367851
13th Plan (Up
to Mar2019)6124 0 0 6124 5948 1504 1980 9432 33692 1512 6605 41809 101335 58238 21173 180746 11734 162552 1010 175296 158833 223806 30768 413407
13th Plan (Up
to Apr-19)6124 0 0 6124 5948 1504 1980 9432 33745 1512 6605 41862 101335 58258 21173 180766 11734 162953 1010 175697 158886 224227 30768 413881
27150 600 MW of 132 kV Inter-Regional power transmission capacity links which are operated radially from time to time is not added in the total
75050
47900
24000
99050
30
Grand Total
Note - The figure upto the end of 10th plan in for stringing progress including the lines not commissioned Now only commissioned lines are reckoned Accordingly the figure for 10th plan (end) may read
as 187555 after adjusting with (-) 10852 Ckm
Inter-regional Power Transfer Capacity (MW)
plusmn 800 kV HVDC plusmn 500 kV HVDC 765 kV 400 kV 220 kV
IR addition in 12th
Plan (up to March
2017)
Inter-regional
Transmission
Capacity at the end
of Plan Period 2017-
22 (as on April19)
IR at the end of 11th
PlanIR at the end of 12th
Plan
IR Capacity Addition
at the end of Plan
Period 2017-22 (Till
April 19)
2004-05 27800
2005-06 28100
2006-07 30200
2007-08 33000
2008-09 35500
2009-10 36700
2010-11 38700
2011-12 41756
2012-13 45460
2013-14 48940
2014-15 53040
2015-16 54590
2016-17 57430
2017-18 60800
2018-19 62890
Year
2005-06
2006-07
2007-08
2008-09
2009-10
2010-11
2011-12
2012-13
2013-14
2014-15
2015-16
2016-17
2017-18
2018-19
2004-05 254 209 7568
2005-06 260 221 7636
2006-07 276 227 7423
2007-08 293 239 7727
2008-09 340 263 8713
2009-10 355 268 8870
2010-11 398 303 11975
2011-12 455 330 13514
2012-13 501 376 14867
2013-14 518 175
2014-15 520
Source- PFC Reports on the performance of State Power Utilities 31
1181
7335
7786
91441
8188
88363
957
1010
1075
1122
1149
(GrossGen+ Net Import) Mid-year population Provisional
5 Average cost of power supply amp average realization ( paiseKWH )
Yearcost of supply
(paiseunit)
Realization(paiseunit)
Including AgricultureOnly
Agriculture
6719
7171
3 All India yearly Coal Consumption for Power Generation (Utilities)
YEARCoal Consumption
Million Tonnes
4 All India Annual per Capita consumption of Electricity Since 2006
Per Capita Consumption ( kWh)
6314
Sl
NoExecuting Agency
Installed
Capacity (MW)Cost (Rs crore)
Date of
Clearance
32
Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as
Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received
from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made
available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified
villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is
independent of the earlier published reports
No Hydro Electric Project has been issued concurrenceAppraisal letter by CEA during April 2019
7 Status of Hydro Schemes Cleared by the CEA in Apr-2019
Name of Scheme
1999-002000-01
297594
010408 to 310309010409 to 310310
10th Plan
2005-062006-07
322968331020
6 Growth Of Rural Electrification amp Pumpsets Energisation
Plan Year
9th Plan2002-03
134092626
4111
Pump Sets Energised Villages Electricfied (Nos)
2001-02
284064367244
1218
27801997-981998-99
3207
482864
12632
1576036
4451722594
15455554
2314176
397343611750
2093311060316074
65109527813884
46708
18423975
499150
2003-042004-05
5743
9769
Cumu upto End of 10th Plan
010407 to 310308
010410 to 310311557976840909
010411 to 310312
412667
86293726
No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification
since 2004-05
65291374575 296361511th Plan
Cumu upto End of 11th Plan
596556 21212860
557439Cummulative up to end of 12th Plan
SN Contents Page
1 Rate of sale of power for the year 2016-17 33-41
RATE OF SALE OF POWER FOR THE YEAR 2016-17
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) NORTHERN REGION
CENTRAL SECTOR
BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 18000 66900 19800
CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 54000 222400 21600
CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 30000 144400 19600
CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 23100 91700 42600
PARBATI - III HPS NHPC LTD HYDRO-HYDRO 52000 68200 54800
DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 28000 95600 30000
CHUTAK NHPC LTD HYDRO-HYDRO 4400 22000 79800
DULHASTI HPS NHPC LTD HYDRO-HYDRO 39000 228000 56400
SALAL HPS NHPC LTD HYDRO-HYDRO 69000 342300 11000
TANAKPUR HPS NHPC LTD HYDRO-HYDRO 9420 43000 29600
URI HPS -I NHPC LTD HYDRO-HYDRO 48000 280300 16000
URI HPS - II NHPC LTD HYDRO-HYDRO 24000 147300 48600
NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 4500 24600 88200
SEWA - II NHPC LTD HYDRO-HYDRO 12000 47100 43400
ANTA CCPP NTPC LTD THERMAL-GASN 41930 67539 32400
AURAIYA CCPP NTPC LTD THERMAL-GASN 66336 53501 39100
BADARPUR TPS NTPC LTD THERMAL-COAL 70500 159153 44800
DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 84000 296170 42300
DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 98000 526686 46300
DADRI CCPP NTPC LTD THERMAL-GASHSD 82978 227469 33000
FARIDABAD CCPP NTPC LTD THERMAL-GASN 43159 115577 30800
RIHAND STPS I NTPC LTD THERMAL-COAL 100000 596766 24500
RIHAND STPS II NTPC LTD THERMAL-COAL 100000 737069 24600
RIHAND STPS III NTPC LTD THERMAL-COAL 100000 706546 30600
SINGRAULI STPS NTPC LTD THERMAL-COAL 200000 1394068 20400
TANDA TPS NTPC LTD THERMAL-COAL 44000 295438 40800
UNCHAHAR TPS I NTPC LTD THERMAL-COAL 42000 256454 39800
UNCHAHAR TPS II NTPC LTD THERMAL-COAL 42000 273577 38900
UNCHAHAR TPS III NTPC LTD THERMAL-COAL 21000 142780 43000
KOLDAM NTPC LTD HYDRO-HYDRO 80000 363260 43600
NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 303575 25841
RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 108000 668677 35374
NJHPS SJVNL HYDRO-HYDRO 150000 699496 23820
RAMPUR HPS SJVNL HYDRO-HYDRO 41202 195982 32260
TEHRI HPP THDC HYDRO-HYDRO 100000 272543 51800
KOTESHWAR HEP THDC HYDRO-HYDRO 40000 106244 53400
IGSTPS JHAJJAR ARAVALI P CPL THERMAL-COAL 150000 510429 49490
NEYVELI BARSINGSAR NEYVELI LIG CORP LTD THERMAL-LIG 25000 127520 38040
STATE SECTOR
PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 21000 14222 48200
PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 21000 19205 48400
PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 25000 102257 42600
PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 25000 62107 41800
DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 60000 312213 41000
RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 120000 35767442200
WYC HYDEL STATION HPGCL HYDRO-HYDRO 6240 20365 24900
GIRI POWER HOUSE HPSEB HYDRO-HYDRO 6000 13958 7600
ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 1695 5467 11900
BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 12000 18528 6700
GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 2250 7462 22500
BASSI POWER HOUSE HPSEB HYDRO-HYDRO 6600 29649 7500
BINWA POWER HOUSE HPSEB HYDRO-HYDRO 600 2749 19300
ANNEXURE-I
RATE OF SALE OF POWER FOR THE YEAR 2016-2017
Page 33
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) GAJ POWER HOUSE HPSEB HYDRO-HYDRO 1050 2914 26700
BANER POWER HOUSE HPSEB HYDRO-HYDRO 1200 2864 16200
HOLI POWER HOUSE HPSEB HYDRO-HYDRO 300 616 22500
THIROT POWER HOUSE HPSEB HYDRO-HYDRO 450 1126 22500
KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 1200 3064 22500
LARJI POWER HOUSE HPSEB HYDRO-HYDRO 12600 53677 23700
NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 250 750 31000
CHABA POWER HOUSE HPSEB HYDRO-HYDRO 175 465 23300
RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 150 101 13400
SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 200 000 22500
KILLAR HPSEB HYDRO-HYDRO 030 050 22500
BHABA AUGUMENP H HPSEB HYDRO-HYDRO 450 1276 22500
BS CHAMBA HPSEB HYDRO-HYDRO 045 099 19500
GUMMA HPSEB HYDRO-HYDRO 300 423 22500
GAS TURBINE POWER STATION IPGCL THERMAL-GAS 27000 67233 39300
PPS-I PPCL THERMAL-GAS 33000 175905 38300
PPS-III PPCL THERMAL-GAS 137120 196879 36100
LOWER JHELUM JampKPDD HYDRO-HYDRO 10500 60214 5100
UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 2260 10514 6300
UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 10500 44202 8500
GANDHARBAL JampKPDD HYDRO-HYDRO 1500 8925 4700
KARNAH MPH JampKPDD HYDRO-HYDRO 200 1122 31000
CHENANI I JampKPDD HYDRO-HYDRO 2330 10892 6600
CHENANI II JampKPDD HYDRO-HYDRO 200 1188 9300
CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 750 3634 14200
IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 375 2108 18500
IGO MERCHELLONG JampKPDD HYDRO-HYDRO 300 1572 29700
PAHALGAM MHP JampKPDD HYDRO-HYDRO 450 1713 32900
MARPACHOO JampKPDD HYDRO-HYDRO 075 375 29800
HAFTAL JampKPDD HYDRO-HYDRO 100 483 28700
SANJAK JampKPDD HYDRO-HYDRO 126 441 36000
SEWA-III JampKPDD HYDRO-HYDRO 900 3273 20200
BHADERWAH JampKPDD HYDRO-HYDRO 150 935 8900
BAZGO JampKPDD HYDRO-HYDRO 030 108 33300
SUMOOR JampKPDD HYDRO-HYDRO 010 045 35400
HUNDER JampKPDD HYDRO-HYDRO 040 176 26200
STAKNA JampKPDD HYDRO-HYDRO 400 1933 4100
KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 124000 662879 31360
SURATGARH TPS RRVUNL THERMAL-COAL 150000 402328 41730
CHHABRA TPS 1amp 2 RRVUNL THERMAL-COAL 50000 305946 36700
CHHABRA TPS 3 RRVUNL THERMAL-COAL 25000 151536 36700
CHHABRA TPS 4 RRVUNL THERMAL-COAL 25000 155896 36700
RAMGARH GT POWER PROJECT RRVUNL THERMAL-COAL 22050 43177 41800
RAMGARH GAS T P PROJECT 3 RRVUNL THERMAL-GAS 5000 93615 41800
DHOLPUR C C POWER PROJECT RRVUNL THERMAL-R-LNG 33000 9486 46110
MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 14000 20855 34192
MINI MICRO HYDEL (MMH) P S RRVUNL HYDRO-HYDRO 2385 851 37800
KALISINDH TPP 1 RRVUNL THERMAL-COAL 60000 341543 45000
KALISINDH TPP 2 RRVUNL THERMAL-COAL 60000 211588 45000
KHARA HEP UPJVNL HYDRO-HYDRO 7200 26654 7200
MATATILLA HEP UPJVNL HYDRO-HYDRO 3060 12219 6500
OBRA HEP UPJVNL HYDRO-HYDRO 9900 21517 6300
RIHAND UPJVNL HYDRO-HYDRO 30000 57369 5500
ANPARA A TPS UPRVUNL THERMAL-COAL 63000 317536 27000
ANPARA B TPS UPRVUNL THERMAL-COAL 100000 705605 22700
ANPARA D UPRVUNL THERMAL-COAL 100000 300158 39800
HARDUAGANJ TPS UPRVUNL THERMAL-COAL 16500 45817 49200
HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 50000 304389 46600
OBRA A TPS UPRVUNL THERMAL-COAL 28800 13158 34000
OBRA B TPS UPRVUNL THERMAL-COAL 100000 328124 21900
Page 34
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) PANKI TPS UPRVUNL THERMAL-COAL 21000 66488 50300
PARICHHA TPS UPRVUNL THERMAL-COAL 22000 38762 49400
PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 42000 231931 45600
PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 50000 276722 50400
CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 24000 70845 8290
CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 14400 75366 8390
DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 3375 9595 12080
DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 5100 18701 10520
KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4140 17359 12330
KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 12000 33001 9420
KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 3000 11953 8320
TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 9000 33983 12460
MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 30400 124510 16110
RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 19800 17897 10550
MPUR UTTARAKHAND JVNL HYDRO-HYDRO 930 5121 19200
PATHRI UTTARAKHAND JVNL HYDRO-HYDRO 2040 11636 14200
GALOGI UTTARAKHAND JVNL HYDRO-HYDRO 300 648 12500
PRIVATE SECTOR
MGTPP CLP INDIA PVT LTD THERMAL-COAL 132000 268902 41940
SHRINAGAR HEP ALAKNANDA HPCL HYDRO-HYDRO 33000 127414 48800
GAMA INFRAPROP CCPP GAMA INFRAPROP PVT THERMAL-GAS 22500 52686 47000
PPGCL (BARA) JP POWER VENTURES LTD THERMAL-COAL 198000 448200 38500
MALANA HEP MALANA PCL HYDRO-HYDRO 8600 26354 29792
MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 10000 30369 32580
ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 19200 56347 36079
KASHANG HEP H P PCL HYDRO-HYDRO 19500 5034 29200
BASPA-II HEP HBPCL HYDRO-HYDRO 30000 132769 13600
KARCHAM WANGTOO HEP HBPCL HYDRO-HYDRO 100000 434386 36600
RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 108000 582600 43700
RITHALA COMBI CY POWER PLANT TATA POWER DDL THERMAL-GAS 9480 000 11900
RAJPURA TPS NABHA POWER LTD THERMAL-GAS 140000 901484 39000
TALWANDI SABO POWER LTD TALWANDI SABO POWER LTD THERMAL-COAL 198000 636040 49548
ROJA THERMAL POWER STATION ROJA POWER SCL THERMAL-COAL 120000 727200 43400
KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 34400 63400
BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 36000 62600
MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 38200 60800
UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 37900 61500
KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 42300 58800
LALITPUR PGCL BAJAJ ENERGY PVT LTD THERMAL-COAL 198000 359400 47300
PRAYAGRAJ PGCL PRAYAGRAJ PGCL THERMAL-COAL 132000 448200 38595
KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 132000 783182 33438
WESTERN REGION
CENTRAL SECTOR
INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 100000 325333 23892
OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 52000 141663 34001
GANDHAR CCPP NTPC LTD THERMAL-GAS 65739 221924 28700
KAWAS CCPP NTPC LTD THERMAL-GASN 65620 167929 27000
KORBA I amp II NTPC LTD THERMAL-COAL 210000 1499171 20500
KORBA III NTPC LTD THERMAL-COAL 50000 358746 26600
SIPAT STPS I NTPC LTD THERMAL-COAL 198000 1479902 26800
SIPAT STPS II NTPC LTD THERMAL-COAL 100000 766549 26500
VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 126000 693142 25800
VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 100000 608781 23800
VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 100000 673475 27600
VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 100000 655924 32900
VINDHYACHAL STPS V NTPC LTD THERMAL-COAL 50000 328265 31700
MOUDA I NTPC LTD THERMAL-COAL 100000 343130 44500
MOUDA Ii NTPC LTD THERMAL-COAL 66000 40637 39900
RATNAGIRI GAS amp POWER PVT LTD RGPPL THERMAL-GAS 196708 442485 47000
KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 000 24729
TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 32000 201227 10740
Page 35
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 365122 19069
TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 787444 29324
STATE SECTOR
GSEG-HAZIRA15610 MW GUJARAT S ENEGEN LTD THERMAL-GAS 15610 1805 28200
GSEG-HAZIRA35143 MW GUJARAT S ENEGEN LTD THERMAL-GAS 35130 22276 51300
GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 21978 51800
AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 13929 26100
KORBA TPS EAST CSPGCL THERMAL-COAL 44000 198673 33880
DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 365808 27570
KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 316500 30420
HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 532878 19410
CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 515 58300
MTTPS CHAMPA U-I CSPGCL THERMAL-COAL 50000 220376 39000
MTTPS CHAMPA U-II CSPGCL THERMAL-COAL 50000 23709 10000
SHP GANGREL CSPGCL HYDRO-HYDRO 1000 2350 36790
BANGO HEP CSPGCL HYDRO-HYDRO 12000 14662 8900
MHP KORBA WEST CSPGCL HYDRO-HYDRO 170 859 38190
SIKASAR HEP CSPGCL HYDRO-HYDRO 700 418 26870
DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8843 74500
DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 19446 51500
GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 66388 71600
GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127488 41300
KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 96072 43900
KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 29841 56400
SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 184966 58800
UKAI 1-5 GSECL THERMAL-COAL 85000 204891 46900
UKAI TPS 6 GSECL THERMAL-COAL 50000 284448 48200
WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 271999 58300
WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 82808 44100
KADANA HPS GSECL HYDRO-HYDRO 24200 34433 16800
UKAI HPS GSECL HYDRO-HYDRO 30500 40585 6100
TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 123000 11500
BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 8900 10900
BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 7200 27500
JHINNA HPS MPPGCL HYDRO-HYDRO 2000 9700 18500
RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 44300 3400
GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 17300 4600
SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 4100 16900
MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 14600 27000
PENCH HPS MPPGCL HYDRO-HYDRO 16000 23700 8100
RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 3000 16900
AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 134400 35100
SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 283800 38700
SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 344600 34300
SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 111600 61600
SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 211800 58000
SSTPS PH-I MPPGCL THERMAL-COAL 120000 233100 84300
BHUSAWAL TPS MSPGCL THERMAL-COAL 142000 566258 51100
CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1365682 33700
KHAPERKHEDA MSPGCL THERMAL-COAL 134000 706207 39100
KORADI TPS MSPGCL THERMAL-COAL 62000 443206 42000
NASIK TPS MSPGCL THERMAL-COAL 63000 297275 47000
PARLI TPS MSPGCL THERMAL-COAL 113000 175934 71600
PARAS MSPGCL THERMAL-COAL 50000 267931 38700
URAN CCPP MSPGCL THERMAL-GAS 67200 320330 30600
KOYANA MSPGCL HYDRO-HYDRO 195600 328155 13100
SMALL HYDRO POWER PLANTS MSPGCL HYDRO-HYDRO 45400 93062 30500
BHIRA MSPGCL HYDRO-HYDRO 8000 10046 8400
TILLARI MSPGCL HYDRO-HYDRO 8900 10584 3100
SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 233298 20500
SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 87633 20500
PRIVATE SECTOR
Page 36
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 81282 46750
JNSTPP(JAYPEE NIGRIE) JP POWER VENTURES LTD THERMAL-COAL 132000 726695 29310
MB POWER MB POWER THERMAL-COAL 120000 345632 38310
ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 754922 28671
ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 780761 23495
ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 198000 1263784 32090
ADANI POWER MAHARA ADANI POWER LTD THERMAL-COAL 330000 1666191 34124
AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 170065 36827
SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 252035 45129
ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 458551 36000
ESSAR POWER MP LTD ESSAR POWER MP LTD THERMAL-COAL 60000 243040 28600
VEDANTA LTD (P P -I) VEDANTA LTD THERMAL-GAS 3000 15044 24000
VEDANTA LTD (P P -II) VEDANTA LTD THERMAL-GAS 3000 21293 24000
PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 8234600 24000
165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 5850 64390
145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 68717 40349
SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 132655 28776
SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 144686 38567
MUNDRA UMPPCOASTAL GUJARAT POWER
LTD THERMAL-IMP COAL 400000 2530300
23900
LANCO AMARKANTAK TPP PATHADIH
U-ILANCO AMARKAN POWER LTD THERMAL-COAL 30000 195500
29200
LANCO AMARKANTAK TPP PATHADIH
U-IILANCO AMARKAN POWER LTD THERMAL-COAL 30000 206900
27600
BARADARHA TPS D B POWER LTD THERMAL-COAL 120000 677373 29200
JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 405000 28900
JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 453000 40500
DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 339437 40700
TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 293400 44000
TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 137200 37000
TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 174900 44000
BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 92900 14100
BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23700 34300
KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 27600 48300
CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2530300 23900
BHANDARDRA HEP -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 2475 54900
SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 161400 26500
SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 445000 39000
SOTHERN REGION
CENTRAL SECTOR
NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 325699 54820
NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 305532 39880
NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 998805 38510
NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 113016 54070
NEYVELI TAMILNADU POWER LTD JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 625274 42200
VALLUR TPS NTPC TECL THERMAL-COAL 150000 856438 42350
R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 1493 84300
RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1502919 29400
RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 341291 31800
SIMHADRI I NTPC LTD THERMAL-COAL 100000 688382 36800
SIMHADRI II NTPC LTD THERMAL-COAL 100000 663657 43400
KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 593110 31324
MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 291625 21764
KKNPP-1 amp 2 NPCIL NUCLEAR-NUCLEAR 200000 572609 40948
MINICOY LAKSHADEEP THERMAL-DIESEL 340 770 29600
KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1097 29600
AMINI LAKSHADEEP THERMAL-DIESEL 265 509 29600
ANDROTT LAKSHADEEP THERMAL-DIESEL 219 524 29600
KALPENI LAKSHADEEP THERMAL-DIESEL 175 356 29600
AGATTI LAKSHADEEP THERMAL-DIESEL 195 658 29600
KADMAT LAKSHADEEP THERMAL-DIESEL 190 414 29600
KILTAN LAKSHADEEP THERMAL-DIESEL 150 269 29600
CHETLET LAKSHADEEP THERMAL-DIESEL 100 139 29600
BITRA LAKSHADEEP THERMAL-DIESEL 043 024 29600
BANGARAM LAKSHADEEP THERMAL-DIESEL 018 009 29600
Page 37
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) STATE SECTOR
Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 721811 46500
Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 50000 336142 46500
RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 237358 46500
RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 239926 46500
RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 124500 46500
SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 62109 46500
UPPER SILERU APGENCO HYDRO-HYDRO 24000 33000 46500
LOWER SILERU APGENCO HYDRO-HYDRO 46000 81066 46500
DONKARAI APGENCO HYDRO-HYDRO 2500 6007 46500
PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 1262 46500
CHETTIPETA APGENCO HYDRO-HYDRO 100 214 46500
MUCHKUND APGENCO HYDRO-HYDRO 12000 37571 46500
NAGARJUNASAGAR RCPH APGENCO HYDRO-HYDRO 9000 606 46500
TUNGABHADRA HES amp HAMPI(AP
Share)
APGENCO HYDRO-HYDRO 7200 6100 46500
KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 352232 42600
KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 288131 32500
KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 319272 46500
RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 40073 44300
KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 308317 46000
KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 308963 51300
SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 61004 76600
NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 17960 75300
PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 20873 58300
POCHAMPAD-I TSPGENCO HYDRO-HYDRO 2700 5455 29800
POCHAMPAD-II TSPGENCO HYDRO-HYDRO 900 1932 40700
NIZAMSAGAR TSPGENCO HYDRO-HYDRO 1000 1126 53400
RAICHUR TPS 1 to 7 KPCL THERMAL-COAL 147000 890866 43800
RAICHUR TPS 8 KPCL THERMAL-COAL 25000 159523 48200
BELLARI TPS 1 KPCL THERMAL-COAL 50000 318679 51100
BELLARI TPS 2 KPCL THERMAL-COAL 50000 232347 55600
BELLARI TPS 3 KPCL THERMAL-COAL 70000 47565 34400
BHADRA PH KPCL HYDRO-HYDRO 3920 2369 45900
GERUSUPPA PH KPCL HYDRO-HYDRO 24000 26990 22000
GHAT PRABHA HEP KPCL HYDRO-HYDRO 3200 4777 25300
KADRA HPS KPCL HYDRO-HYDRO 15000 16889 26800
NAGJHARI KPCL HYDRO-HYDRO 90000 155159 9800
KODASALLI DPH KPCL HYDRO-HYDRO 12000 14854 19200
MUNIRA+MGH+SPH+SPH KPCL HYDRO-HYDRO 22640 48211 7900
SHARAVATHY HPS KPCL HYDRO-HYDRO 108550 276215 5400
ALMATTI DPH KPCL HYDRO-HYDRO 29000 39611 24600
VARAHI UGPH KPCL HYDRO-HYDRO 46000 71368 15600
IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 17196 15300
IDUKKI HPS KSEB HYDRO-HYDRO 78000 137905 15300
KAKKAD HPS KSEB HYDRO-HYDRO 5000 13063 15300
KALLADA HPS KSEB HYDRO-HYDRO 1500 4436 15300
KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 46544 15300
KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 635 15300
LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 30822 15300
MALANKARA HPS KSEB HYDRO-HYDRO 1050 2474 15300
MATTUPETTY KSEB HYDRO-HYDRO 200 230 15300
MALAMPUZHA KSEB HYDRO-HYDRO 250 063 15300
CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 864 15300
URUMI ST I amp II KSEB HYDRO-HYDRO 615 903 15300
LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 248 15300
NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7765 19625 15300
PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 16601 15300
PANNIAR HPS KSEB HYDRO-HYDRO 3240 6217 15300
PORINGALKUTHU KSEB HYDRO-HYDRO 3600 10052 15300
PORINGALKUTHU LBE KSEB HYDRO-HYDRO 1600 9438 15300
PEPPARA KSEB HYDRO-HYDRO 300 395 15300
POOZHITHODE KSEB HYDRO-HYDRO 480 1045 15300
Page 38
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) PEECHI KSEB HYDRO-HYDRO 125 040 15300
RANI-PERUNADU KSEB HYDRO-HYDRO 400 585 15300
SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 79783 15300
SENGULAM HPS KSEB HYDRO-HYDRO 5120 11558 15300
SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 16711 15300
VILANGAD KSEB HYDRO-HYDRO 750 1578 15300
BARAPOLE KSEB HYDRO-HYDRO 1500 1932 15300
VELLATHOOVAL KSEB HYDRO-HYDRO 360 305 15300
CHIM0NY KSEB HYDRO-HYDRO 250 156 15300
ADYANPARA KSEB HYDRO-HYDRO 350 501 15300
BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 554 15300
KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 3801 15300
KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 23132 32800
ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 14416 62280
METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 523970 62280
METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 321270 62280
NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 336575 62280
NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 591240 62280
TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 508966 62280
KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 30897 62280
VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 18720 90699 62280
KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 33593 62280
BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 1047 62280
PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 1250 62280
PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 330 62280
MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 4897 62280
MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 032 62280
KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15681 62280
KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 40608 62280
KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 21342 62280
KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 4717 62280
KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4322 62280
KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2399 62280
METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 4416 62280
METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 8035 62280
BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2187 62280
BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2359 62280
BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2511 62280
BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 1949 62280
BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 1819 62280
POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 172 62280
SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 241 62280
MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 026 62280
THIRUMOORTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 136 62280
PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 9309 62280
VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 353 62280
SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 4192 62280
PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 6571 62280
SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 1186 62280
SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6319 62280
ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 6122 62280
KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 28674 62280
SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 18381 62280
SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 4258 62280
KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 12680 62280
KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4201 62280
ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 000 62280
PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 19175 62280
AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 078 62280
BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 504 62280
BHAVANI KATTALAI (BKB)(IIIampIII BB I amp II)TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 5847 62280
PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 000 62280
Page 39
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) SRI DAMODARAM STPS APPDCL THERMAL-COAL 160000 808108 36300
PRIVATE SECTOR
KARUPPUR TANJORE LANCO TANJORE PCL THERMAL-GAS 12000 48096 28770
SIMHAPURI ENERGY LTD SIMHAPURI ENERGY LTD THERMAL-COAL 60000 143900 39100
JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 7111 45500
SBU 1 JSW ENERGY LTD
VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 26000 159100
43300
SBU 2 JSW ENERGY LTD
VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 60000 247900
42800
LANCO KPLLANCO KONDAPALLI POWER
LTDTHERMAL-GAS 36814 85060
25776
LANCO KPL STG -IILANCO KONDAPALLI POWER
LTDTHERMAL-GAS 36600 12979
46330
LANCO KPL STG -IIIALANCO KONDAPALLI POWER
LTDTHERMAL-GAS 37100 85710
46330
LANCO KPL STG -III BLANCO KONDAPALLI POWER
LTDTHERMAL-GAS 37100 43639
46330
HINDUJA NATIONAL PCL HINDUJA NATIONAL PCL THERMAL-COAL 104000 303000 38200
MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 121164 49940
UDUPI POWER COR LTD ADANI POWER LTD THERMAL-COAL 120000 754613 42500
SPECTRUM POWER GENERATION
LTD SPECTRUM PG LTD THERMAL-GASN 20525 9256812
34952
TAQA NEYVELI POWER COM PVT
LTD TAQA NEYVELI THERMAL-LIG 25000 5840
34500
ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 251000 51000
ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 207860 36800
GMR VEMAGIRI POWER GENERATION
LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 30117
46450
EASTERN REGION
CENTRAL SECTOR
MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 64675 53113
MTPS STAGE - II KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 39000 1432 69138
BOKARO `B` TPS DVC THERMAL-COAL 63000 145670 31539
MEJIA TPS U 1-3 DVC THERMAL-COAL 63000 348298 31552
MEJIA TPS U 4 DVC THERMAL-COAL 21000 116099 34997
MEJIA TPS U 5-6 DVC THERMAL-COAL 50000 276427 35976
MEJIA TPS U 7-8 DVC THERMAL-COAL 100000 552854 36991
DURGAPUR STEEL TPS DVC THERMAL-COAL 100000 665550 39323
DURGAPUR TPS DVC THERMAL-COAL 21000 59270 35416
RAGHUNATHPUR TPS DVC THERMAL-COAL 120000 201650 35326
MAITHON HYDEL STA DVC HYDRO-HYDRO 6320 12200 17984
CHANDRAPURA TPSU1-3 DVC THERMAL-COAL 42000 257610 35095
CHANDRAPURA TPSU7-8 DVC THERMAL-COAL 50000 306673 34987
KODERMA TPS DVC THERMAL-COAL 100000 380180 38131
PANCHET HPS DVC HYDRO-HYDRO 8000 13360 17984
TILLAYA HPS DVC HYDRO-HYDRO 400 1410 17984
RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34700 35400
TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 277300 23200
TLDP -III NHPC LTD HYDRO-HYDRO 13200 55400 62000
TLDP -IV NHPC LTD HYDRO-HYDRO 16000 60300 25600
FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 957219 33700
FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 308943 41000
BONGAINGAON TPS NTPC LTD THERMAL-COAL 25000 153663 58600
KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 542277 34200
KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 942591 34200
BARH-II NTPC LTD THERMAL-COAL 132000 728021 44500
TALCHER TPS NTPC LTD THERMAL-COAL 46000 335521 30100
TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 702319 25600
TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1436521 24700
STATE SECTOR
BTPS(RampM) BIHAR STATE PGCL THERMAL-COAL 22000 12142 39700
BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 98331 10602
HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 50593 9482
CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 19689 2605
RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 53192 6033
UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 147208 14637
Page 40
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 60353 4519
IB TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 288567 25000
J P H GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 210 038 61100
MEYONG CHU GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 400 1086 61100
TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 122667 38200
DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 214339 43321
KOLAGHAT THERMAL POWER
STATION
WEST BENGAL PDCL THERMAL-COAL 126000 538269 31603
BAKRESHWAR THERMAL POWER
PLANT
WEST BENGAL PDCL THERMAL-COAL 105000 634876 32154
BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 45000 166855 33299
SANTHALDIH THERMAL POWER
STATION
WEST BENGAL PDCL THERMAL-COAL 50000 336442 34932
SAGARDIGHI THERMAL POWER
PROJECT
WEST BENGAL PDCL THERMAL-COAL 160000 423121 34705
JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 20344 68900
RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 24559 68900
TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 4623 68900
PURULIA PUMPED STORAGE
PROJECT
WEST BENGAL SEDCL HYDRO-HYDRO 90000 108816 68900
MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2768 68900
PRIVATE SECTOR
CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 49474 20230
CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 555500 70200
HALDIA ENERGY HALDIA ENERGY LTD THERMAL-COAL 60000 371000 50400
DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3688 63400
KAMALANGA TPS GMR KAMALANGA ENERGY LTD THERMAL-COAL 105000547670
33300
ADHUNIK POWER U-1 ADHUNIK POWER THERMAL-COAL 27000 158 44060
ADHUNIK POWER U-2 ADHUNIK POWER THERMAL-COAL 27000 168 44250
VL-JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 332800 23622
JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 43000 45250
JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 71700 37030
JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 70700 35920
JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 71100 38870
JOJOBERA UNIT 5 TATA POWER COM LTD THERMAL-COAL 12000 79300 44560
JOJOBERA UNIT 6 TATA POWER COM LTD THERMAL-WHR 12000 83700 12840
IEL KALINGANAGAR U-I TATA POWER COM LTD THERMAL-WG 6750 33400 22500
IEL KALINGANAGAR U-II TATA POWER COM LTD THERMAL-WG 6750 34800 22500
MAITHON UNIT 1 amp 2 TATA POWER COM LTD THERMAL-COAL 105000 678000 36100
HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 27500 24340
HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 28400 24340
HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 15800 24310
NORTH EASTERN REGION
CENTRAL SECTOR
LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 74100 36600
AGARTALA GT NEEPCO THERMAL-GAS 13500 88611 27210
ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 153111 32310
DOYANG HEP NEEPCO HYDRO-HYDRO 7500 25598 49801
KOPILI HEP NEEPCO HYDRO-HYDRO 20000 98186 11491
KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 19582 20237
KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 10310 17968
RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 124093 22945
TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 10100 17344 39000
STATE SECTOR
HYDRO POWER (122 Stns) ITANAGAR GOVT OF ARUNACHAL
PRADESHHYDRO-HYDRO 6971 6217270
24600
KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39514 17337
LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 82327 36810
NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 33318 48290
MYNTRIANG SHEP ST II ASSAM POWER GENCO HYDRO-HYDRO 300 567 35776
LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 9130 49200
LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 012 49200
DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 022 49200
TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 000 49200
UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 4990 16000
UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 6476 37000
UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 16494 14600
UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 3600 9556 15000
SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 758 8000
MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44070 44800
KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 154 41400
TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 091 41400
MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 411 41400
MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 394 41400
KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 760 41400
SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 3264 41400
LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 044 41400
BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 18953 28000
ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 43585 28200
GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 4080 11100
Note
LIG Lignite N Naptha WHR Waste Heat Recovery
Page 41
(As on 30042019)
Coal Lignite Gas Diesel Total
State 000 000 000 4005 4005 000 000 525 4530
Private 000 000 000 000 000 000 000 663 663
Central 000 000 000 000 000 000 000 510 510
Sub-Total 000 000 000 4005 4005 000 000 1698 5703
State 000 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 000 075 075
Central 000 000 000 000 000 000 000 000 000
Sub-Total 000 000 000 000 000 000 000 075 075
State 000 000 000 4005 4005 000 000 525 4530
Private 000 000 000 000 000 000 000 738 738
Central 000 000 000 000 000 000 000 510 510
Grand Total 000 000 000 4005 4005 000 000 1773 5778
Andaman amp
Nicobar
Lakshadweep
Total (Islands)
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
ISLANDS
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
State Ownership Sector
Mode wise breakup
Grand TotalThermalNuclear Hydro
RES
(MNRE)
SrNo Contents Page
1 Executive summary of Target and Achievement of Transmission Lines during 2019-20
20(1)
2 List of Transmission Lines CommissionedReady for commissioning during Apr-2019 20(2)
Section C - Transmission Lines
1 Executive summary of Target and Achievement of Transmission Lines during 2019-20 As on 30-04-19
(All figures in circuit kms)
Ce
ntr
al S
ecto
r
Sta
te S
ecto
r
JV
Pri
va
te S
ecto
r
To
tal
Ce
ntr
al S
ecto
r
Sta
te S
ecto
r
JV
Pri
va
te S
ecto
r
To
tal
Ce
ntr
al S
ecto
r
Sta
te S
ecto
r
JV
Pri
va
te S
ecto
r
To
tal
Ce
ntr
al S
ecto
r
Sta
te S
ecto
r
JV
Pri
va
te S
ecto
r
To
tal
Ce
ntr
al S
ecto
r
Sta
te S
ecto
r
JV
Pri
va
te S
ecto
r
To
tal
Ce
ntr
al
Se
cto
r
Sta
te S
ec
tor
JV
Pri
va
te S
ec
tor
Gra
nd
To
tal
0 0 0 0 0 0 0 0 2727 958 2334 6019 2239 3416 1143 6798 781 10023 0 10804 5747 14397 3477 23621
Apr19 Programme 0 0 0 0 0 0 0 0 577 416 557 1550 60 890 203 1153 0 309 0 309 637 1615 760 3012
Achievement 0 0 0 0 0 0 0 0 53 0 0 53 0 20 0 20 0 401 0 401 53 421 0 474
Upto Apr-19 Programme 0 0 0 0 0 0 0 0 577 416 557 1550 60 890 203 1153 0 309 0 309 637 1615 760 3012
Achievement 0 0 0 0 0 0 0 0 53 0 0 53 0 20 0 20 0 401 0 401 53 421 0 474
20(1)
220 kV Grand Total 800 kV 500 kV
Programme 2019-20
Programme
Achievement
HVDC765 kV 400 kV
Line
1 2 3 4 5 6
1 400 Bhadla (PG) - Bhadla (RVPN) line DC PGCIL 53
53
2 400 LILO of one ckt Jhanor - Navsari at Vav Ss DC GETCO 20
3 220 Banda-Chitrakoot Line DC UPPTCL 226
4 220 Gorakhpur (PG)-Gola line DC UPPTCL 82
5 220 Hapur(765) - Faridnagar line SC UPPTCL 11
6 220 Kalikiri - Madanapalli line DC APTRANSCO 60
7 220LILO of Gr Noida -Noida Sec-129 at Noida
Sec-148DC UPPTCL 1
8 220LILO of one Ckt of Badshahpur Pali at Sec-
65 GurgaonDC HVPNL 3
9 220 Sultanpur-Sangipur LILO Section at Amethi DC UPPTCL 18
421
0
474
20(2)
Grand Total
2Transmission Lines (220 kV and above) CommissionedReady for commissioning During Apr-2019
Voltage
Level (kV)Name of Transmission Lines
Circuit
Type
Executing
Agency
CENTRAL SECTOR
Total of CENTRAL SECTOR
STATE SECTOR Sector
Total of STATE SECTOR
PRIVATE SECTOR
Total of PRIVATE SECTOR
SlNo
Length(CKm)
As on 30-04-19
SN Contents Page
1 Executive summary of Target and Achievement of Substations during 2019-20 21(1)
2Sub Stations (220 kV and above) commissionedready for commisssioning during Apr-
201921(2)
Section D - Sub Stations
1 Executive summary of Target and Achievement of Substations during 2019-2020 As on 30-04-19
(All figures in circuit MVA)
Ce
ntr
al S
ecto
r
Sta
te S
ecto
r
JV
Pri
va
te S
ecto
r
To
tal
Ce
ntr
al S
ecto
r
Sta
te S
ecto
r
JV
Pri
va
te S
ecto
r
To
tal
Ce
ntr
al S
ecto
r
Sta
te S
ecto
r
JV
Pri
va
te S
ecto
r
To
tal
Ce
ntr
al S
ecto
r
Sta
te S
ecto
r
JV
Pri
va
te S
ecto
r
To
tal
Ce
ntr
al S
ecto
r
Sta
te S
ecto
r
JV
Pri
va
te S
ecto
r
To
tal
Ce
ntr
al S
ec
tor
Sta
te S
ec
tor
JV
Pri
va
te S
ec
tor
Gra
nd
To
tal
3000 0 0 3000 0 0 0 0 18000 3000 6000 27000 5205 19665 4260 29130 800 21786 0 22586 27005 44451 10260 81716
Apr19 Programme 0 0 0 0 0 0 0 0 3000 0 3000 6000 0 1000 2000 3000 0 800 0 800 3000 1800 5000 9800
Achievement 0 0 0 0 0 0 0 0 500 0 0 500 815 1980 0 2795 0 1305 0 1305 1315 3285 0 4600
Upto Apr-19 Programme 0 0 0 0 0 0 0 0 3000 0 3000 6000 0 1000 2000 3000 0 800 0 800 3000 1800 5000 9800
Achievement 0 0 0 0 0 0 0 0 500 0 0 500 815 1980 0 2795 0 1305 0 1305 1315 3285 0 4600
21(1)
220 kV Grand Total 800 kV 500 kV
Programme 2019-20
Programme
Achievement
HVDC765 kV 400 kV
As on 30-04-19
Sl Voltage Ratio Capacity
No (kVkV) (MWMVA)
1 2 3 4 5
1 Bhadla SS (3x1500 3x500 MVA) 765400 PGCIL 500
2 Extn at Tumkur (Pavagada ) PS (2x500 MVA) 400220 PGCIL 500
3 Bongaigaon (2nd ICT) Ss 400220 PGCIL 315
Total of CENTRAL SECTOR 1315
4 Motiram Adda Gorakhpur (Aug) (Additional TF) 400220 UPPTCL 240
5 Muradnagar-II Ghaziabad (Aug) (Additional TF) 400220 UPPTCL 240
6 Noida Sec- 148 GBNagar (New) 400220 UPPTCL 5007 Sarnath Varanasi (Aug) TF- II (500-315) 400220 UPPTCL 1858 Sarojininagar Lucknow Aug) TF- II (500-315) 400220 UPPTCL 185
9 Unnao (Aug) TF-III 400220 UPPTCL 31510 Nawada SS 400220 HVPNL 31511 Kharepatan SS 22033 MSETCL 2512 Prathipadu SS 220132 APTRANSCO 10013 Pali Ss 22066 HVPNL 160
14 A-5 Faridabad Ss 22066 HVPNL 60
15 Rentachintala Ss Aug(3X100-2x100) 220132 APTRANSCO 10016 Amethi Ss 220132 UPPTCL 160
17 Gajokhar Varanasi (Aug) TF- II (160-100) 220132 UPPTCL 60
18 Gola Gorakhpur (New) 220132 UPPTCL 160
19 Khurja Bulandshahr (Aug) TF- II (200-160) 220132 UPPTCL 40
20 RC Green GB Nagar (Aug) TF-II (160-100) 220132 UPPTCL 60
21 Sikandrabad Bulandshahr (Aug) (Additional TF) 220132 UPPTCL 160
22 Sitapur (Aug) (Additional TF) 220132 UPPTCL 160
23 Sohawal Ayodhya (Aug) TF-II (160-100) 220132 UPPTCL 60
TOTAL STATE SECTOR 3285
GRAND TOTAL 4600
21(2)
CENTRAL SECTOR
STATE SECTOR
2Sub-Stations (220 kV and above) CommissionedReady for commissioning During Apr-2019
Name of Sub Stations Executing Agency
SN Contents Page
1 Electricity Generation (MU) Targets and Achievements for 2019-20 22
Section E - Electricity Generation
Programme Achievement Ach Programme Achievement Ach
Central Sector 37545100 3177900 3129530 9848 3177900 3129530 9848
State Sector 37498600 3322500 2950558 8881 3322500 2950558 8881
PvtIPP Sector 37346200 3236400 3195940 9875 3236400 3195940 9875
PvtUTL Sector 1823100 159300 165579 10394 159300 165579 10394
Total 114213000 9896100 9441607 9541 9896100 9441607 9541
Central Sector 5661700 386100 481390 12468 386100 481390 12468
State Sector 6680500 498200 536514 10769 498200 536514 10769
PvtIPP Sector 1206900 57300 80405 14032 57300 80405 14032
PvtUTL Sector 144100 12300 10930 8886 12300 10930 8886
Total 13693200 953900 1109239 11628 953900 1109239 11628
Central Sector 4472000 367300 317765 8651 367300 317765 8651
Total 4472000 367300 317765 8651 367300 317765 8651
Bhutan Import 621800 17500 24396 13941 17500 24396 13941
Central Sector 47678800 3931300 3928685 9993 3931300 3928685 9993
State Sector 44179100 3820700 3487072 9127 3820700 3487072 9127
Pvt Sector 40520300 3465300 3452854 9964 3465300 3452854 9964
Total 133000000 11234800 10893007 9696 11234800 10893007 9696
Provisional based on actual-cum-Assesment
Figs in MU
Cummulative
Achievement
Cummulative
Achievement
Mar-19 Mar-18 Upto Mar-2019 Upto Mar-2018
984785 869291 12675910 10183949
22
1 Electricity Generation (MU) Targets and Achievememts for 2019-20
All India Energy Generation During Apr-19 to Apr-19 (MU)
Target (2019-20)Apr-19 to Apr-19
Sector
Hydro
Thermal
Nuclear
Renewable Energy Generation
Achievement
Apr-2019
98961
95393673
112348
94416
11092
3178
108930
0
20000
40000
60000
80000
100000
120000
Thermal Hydro Nuclear Total
Programme
Achievement
SN Contents Page
1 Energy Power Supply Position (Provisional) for Apr-2019 and during Apr-19 to Apr-19 23
2 Peak Power Supply Position (Provisional) for Apr-2019 and during Apr-19 to Apr-19 24
3 Energy Power Supply Position (Revised) for Mar-2019 and during Apr-19 to Mar-19 25
4 Peak Power Supply Position (Revised) for Mar-2019 and during Apr-19 to Mar-19 26
5 Notified Power cuts Restrictions on Industries during Apr-2019 27
6 Power Supply to Agricultural Sector during Apr-2019 28
Section F - Power supply position
आकड़ मममलयन यननट नट Figures in MU net
ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied
कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )
चडीगढ़ Chandigarh 117 117 0 00 117 117 0 00
दिलली Delhi 2698 2698 1 00 2698 2698 1 00
हरियजणज Haryana 3773 3773 0 00 3773 3773 0 00
दहमजचल परिश Himachal Pradesh 777 777 0 00 777 777 0 00
रमम कशमीि Jammu amp Kashmir 1604 1296 308 192 1604 1296 308 192
परजब Punjab 3646 3646 0 00 3646 3646 0 00
िजरसथजन Rajasthan 6210 6208 2 00 6210 6208 2 00
उतति परिश Uttar Pradesh 10179 10148 32 03 10179 10148 32 03
उततिजखड Uttarakhand 1120 1120 0 00 1120 1120 0 00
उततरी कषतर Northern Region 30094 29786 308 10 30094 29786 308 10
छततीसगढ़ Chhattisgarh 2684 2676 8 03 2684 2676 8 03
गरिजत Gujarat 10718 10718 0 00 10718 10718 0 00
मधय परिश Madhya Pradesh 6006 6006 0 00 6006 6006 0 00
महजिजषटर Maharashtra 14308 14308 0 00 14308 14308 0 00
िमन औि दिउ Daman amp Diu 220 220 0 00 220 220 0 00
िजिि व नगि हवली Dadra amp Nagar Haveli 552 552 0 00 552 552 0 00
गोवज Goa 388 388 0 00 388 388 0 00
पशचिमी कषतर Western Region 34875 34868 8 00 34875 34868 8 00
आनधर परिश Andhra Pradesh 5708 5708 0 00 5708 5708 0 00
तलगजनज Telangana 5725 5725 0 00 5725 5725 0 00
कनजाटक Karnataka 7003 7003 0 00 7003 7003 0 00
किल Kerala 2402 2400 2 01 2402 2400 2 01
तममल नजड Tamil Nadu 10010 10010 0 00 10010 10010 0 00
पडचिी Puducherry 263 263 0 00 263 263 0 00
लकष-दवीप Lakshadweep 4 4 0 0 4 4 0 0
दकषकषणी कषतर Southern Region 31111 31109 2 00 31111 31109 2 00
बबहजि Bihar 2589 2589 0 00 2589 2589 0 00
िजमोिि घजटी ननगम DVC 1772 1772 0 00 1772 1772 0 00
झजिखणड Jharkhand 689 689 0 00 689 689 0 00
ओडडशज Odisha 2689 2689 1 00 2689 2689 1 00
पशशचम बगजल West Bengal 5075 5075 0 00 5075 5075 0 00
मसशककम Sikkim 37 37 0 00 37 37 0 00
अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 7 29 27 2 7
परवी कषतर Eastern Region 12851 12850 1 00 12851 12850 1 00
अरणजचल परिश Arunachal Pradesh 66 66 0 05 66 66 0 05
असम Assam 766 709 57 75 766 709 57 75
मणणपि Manipur 68 67 1 15 68 67 1 15
मघजलय Meghalaya 170 160 10 59 170 160 10 59
ममज़ोिम Mizoram 54 53 0 08 54 53 0 08
नजगजलड Nagaland 54 54 0 08 54 54 0 08
बिपिज Tripura 122 120 1 12 122 120 1 12
उततर-परवी कषतर North-Eastern Region 1300 1228 71 55 1300 1228 71 55
समपणण भारत All India 110231 109842 389 04 110231 109842 389 04
23
ऊरजा पनत ा म कमी ऊरजा पनत ा म कमीEnergy not Supplied
Excludes energy exported to Bangladesh
Energy not Supplied
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
ऊराण वरवदयत आपरत ण शथिरत ररपोरण (परवाणरवलोकन) Energy Power Supply Position Report (Provisional)
राजयState
अपरल 2019 April2019 अपरल2019 -अपरल2019 April2019 to April2019
अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met
कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )
चडीगढ़ Chandigarh 256 256 0 00 256 256 0 00
दिलली Delhi 5664 5664 0 00 5664 5664 0 00
हरियजणज Haryana 8127 8127 0 00 8127 8127 0 00
दहमजचल परिश Himachal Pradesh 1387 1387 0 00 1387 1387 0 00
रमम कशमीि Jammu amp Kashmir 2826 2261 565 200 2826 2261 565 200
परजब Punjab 7015 7015 0 00 7015 7015 0 00
िजरसथजन Rajasthan 10560 10560 0 00 10560 10560 0 00
उतति परिश Uttar Pradesh 19935 19935 0 00 19935 19935 0 00
उततिजखड Uttarakhand 1922 1922 0 00 1922 1922 0 00
उततरी कषतर Northern Region 54476 53985 491 09 54476 53985 491 09
छततीसगढ़ Chhattisgarh 4596 4574 22 05 4596 4574 22 05
गरिजत Gujarat 17871 17865 6 00 17871 17865 6 00
मधय परिश Madhya Pradesh 10018 10018 0 00 10018 10018 0 00
महजिजषटर Maharashtra 23158 23150 8 00 23158 23150 8 00
िमन औि दिउ Daman amp Diu 341 340 1 02 341 340 1 02
िजिि व नगि हवली Dadra amp Nagar Haveli 818 818 0 00 818 818 0 00
गोवज Goa 594 594 0 00 594 594 0 00
पशचिमी कषतर Western Region 56242 56222 20 00 56242 56222 20 00
आनधर परिश Andhra Pradesh 9151 9151 0 00 9151 9151 0 00
तलगजनज Telangana 10191 10191 0 00 10191 10191 0 00
कनजाटक Karnataka 12681 12681 0 00 12681 12681 0 00
किल Kerala 4309 4300 8 02 4309 4300 8 02
तममल नजड Tamil Nadu 15972 15972 0 00 15972 15972 0 00
पडचिी Puducherry 482 480 2 05 482 480 2 05
लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0
दकषकषणी कषतर Southern Region 49155 49103 52 01 49155 49103 52 01
बबहजि Bihar 5357 5357 0 00 5357 5357 0 00
िजमोिि घजटी ननगम DVC 3039 3039 0 00 3039 3039 0 00
झजिखणड Jharkhand 1266 1266 0 00 1266 1266 0 00
ओडडशज Odisha 5389 5389 0 00 5389 5389 0 00
पशशचम बगजल West Bengal 8666 8666 0 00 8666 8666 0 00
मसशककम Sikkim 100 100 0 00 100 100 0 00
अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7
परवी कषतर Eastern Region 23349 23349 0 00 23349 23349 0 00
अरणजचल परिश Arunachal Pradesh 139 136 3 22 139 136 3 22
असम Assam 1712 1667 45 26 1712 1667 45 26
मणणपि Manipur 197 188 9 46 197 188 9 46
मघजलय Meghalaya 336 336 0 00 336 336 0 00
ममज़ोिम Mizoram 116 113 3 26 116 113 3 26
नजगजलड Nagaland 157 131 26 166 157 131 26 166
बिपिज Tripura 292 291 1 03 292 291 1 03
उततर-परवी कषतर North-Eastern Region 2848 2780 68 24 2848 2780 68 24
समपणण भारत All India 177411 176810 601 03 177411 176810 601 03
24
मजग की पनत ा म कमी Demand not Met
Excludes the supply to Bangladesh
राजयStateअपरल 2019 April2019
मजग की पनत ा म कमी Demand not Met
अधिकतम वरवदयत आपरत ण शथिरत ररपोरण (परवाणरवलोकन) Peak Power Supply Position Report (Provisional)
आकड़ मगज वजट नट Figures in MW netअपरल2019 -अपरल2019 April2019 to April2019
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
आकड़ मममलयन यननट नट Figures in MU net
ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied
कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )
चडीगढ़ Chandigarh 96 96 0 00 1561 1561 0 00
दिलली Delhi 1931 1930 1 00 32299 32282 17 01
हरियजणज Haryana 3658 3658 0 00 53665 53665 0 00
दहमजचल परिश Himachal Pradesh 832 830 2 02 9850 9618 232 24
रमम कशमीि Jammu amp Kashmir 1767 1414 353 200 19593 15868 3725 190
परजब Punjab 3585 3585 0 00 55288 55275 13 00
िजरसथजन Rajasthan 6774 6770 4 01 79826 79637 189 02
उतति परिश Uttar Pradesh 8754 8691 63 07 117101 116118 984 08
उततिजखड Uttarakhand 1067 1067 0 00 13845 13753 92 07
उततरी कषतर Northern Region 28464 28041 423 15 383028 377776 5251 14
छततीसगढ़ Chhattisgarh 2464 2457 8 03 26130 26076 54 02
गरिजत Gujarat 9890 9890 0 00 116588 116572 15 00
मधय परिश Madhya Pradesh 6236 6236 0 00 75667 75665 2 00
महजिजषटर Maharashtra 13631 13631 0 00 158285 158148 137 01
िमन औि दिउ Daman amp Diu 221 221 0 00 2557 2557 0 00
िजिि व नगि हवली Dadra amp Nagar Haveli 553 553 0 00 6317 6317 0 00
गोवज Goa 362 362 0 00 4283 4280 3 01
पशचिमी कषतर Western Region 33357 33349 8 00 389827 389615 212 01
आनधर परिश Andhra Pradesh 6072 6071 1 00 63735 63677 58 01
तलगजनज Telangana 6930 6929 1 00 66697 66635 62 01
कनजाटक Karnataka 7614 7612 1 00 71759 71690 69 01
किल Kerala 2489 2488 1 00 25029 24911 118 05
तममल नजड Tamil Nadu 10247 10245 2 00 109375 109273 102 01
पडचिी Puducherry 252 251 1 04 2761 2751 10 03
लकष-दवीप Lakshadweep 4 4 0 0 46 46 0 0
दकषकषणी कषतर Southern Region 33605 33597 8 00 339355 338938 417 01
बबहजि Bihar 2319 2318 1 00 30052 29827 225 07
िजमोिि घजटी ननगम DVC 1773 1772 1 00 22365 21995 369 17
झजिखणड Jharkhand 698 697 1 01 8682 8461 221 25
ओडडशज Odisha 2583 2582 1 00 31810 31781 30 01
पशशचम बगजल West Bengal 4585 4584 2 00 52237 52078 159 03
मसशककम Sikkim 41 41 0 00 513 512 0 01
अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 67 346 323 23 67
परवी कषतर Eastern Region 11999 11995 5 00 145658 144654 1004 07
अरणजचल परिश Arunachal Pradesh 61 60 0 06 864 855 9 10
असम Assam 680 656 23 34 9532 9204 328 34
मणणपि Manipur 68 68 1 09 916 906 10 11
मघजलय Meghalaya 173 173 0 03 1955 1953 1 01
ममज़ोिम Mizoram 50 49 0 09 668 661 8 12
नजगजलड Nagaland 58 57 1 20 902 809 93 103
बिपिज Tripura 150 150 0 00 1859 1837 21 11
उततर-परवी कषतर North-Eastern Region 1240 1214 26 21 16696 16225 471 28
समपणण भारत All India 108665 108196 469 04 1274564 1267209 7355 06
Note The revised data for March 2019 is not avaliable
Excludes energy exported to Bangladesh
राजयState
ऊराण वरवदयत आपरत ण शथिरत ररपोरण (परवाणरवलोकन) Energy Power Supply Position Report (Provisional)
25
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
Energy not Supplied Energy not Supplied
मािण2019 March2019 अपरल2018 -मािण2019 April2018 to March2019
ऊरजा पनत ा म कमी ऊरजा पनत ा म कमी
अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met
कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )
चडीगढ़ Chandigarh 223 223 0 00 369 369 0 00
दिलली Delhi 4016 4016 0 00 7016 7016 0 00
हरियजणज Haryana 6544 6544 0 00 10270 10270 0 00
दहमजचल परिश Himachal Pradesh 1683 1683 0 00 1700 1700 0 00
रमम कशमीि Jammu amp Kashmir 3277 2622 655 200 3277 2622 655 200
परजब Punjab 6564 6564 0 00 12638 12638 0 00
िजरसथजन Rajasthan 11885 11885 0 00 13276 13276 0 00
उतति परिश Uttar Pradesh 16220 16220 0 00 20498 20062 436 21
उततिजखड Uttarakhand 2002 2002 0 00 2216 2216 0 00
उततरी कषतर Northern Region 47925 47356 569 12 63166 61726 1440 23
छततीसगढ़ Chhattisgarh 4444 4128 316 71 4444 4270 174 39
गरिजत Gujarat 16263 16263 0 00 17053 16963 90 05
मधय परिश Madhya Pradesh 12328 12323 5 00 13815 13815 0 00
महजिजषटर Maharashtra 22361 22291 70 03 23864 23254 610 26
िमन औि दिउ Daman amp Diu 336 336 0 01 357 356 1 02
िजिि व नगि हवली Dadra amp Nagar Haveli 800 799 1 01 816 815 1 01
गोवज Goa 538 538 0 00 596 596 0 00
पशचिमी कषतर Western Region 53132 52965 167 03 56675 55821 853 15
आनधर परिश Andhra Pradesh 8977 8977 0 00 9459 9453 6 01
तलगजनज Telangana 10471 10471 0 00 10815 10815 0 00
कनजाटक Karnataka 12841 12841 0 00 12841 12841 0 00
किल Kerala 4264 4228 36 09 4264 4228 36 09
तममल नजड Tamil Nadu 15712 15712 0 00 15712 15712 0 00
पडचिी Puducherry 427 412 15 34 427 412 15 34
लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0
दकषकषणी कषतर Southern Region 49464 49464 0 00 49464 49464 0 00
बबहजि Bihar 4633 4633 0 00 5115 5084 31 06
िजमोिि घजटी ननगम DVC 3035 3035 0 00 3035 3035 0 00
झजिखणड Jharkhand 1210 1210 0 00 1339 1291 48 36
ओडडशज Odisha 4827 4827 0 00 5357 5357 0 00
पशशचम बगजल West Bengal 8287 8287 0 00 9130 9123 7 01
मसशककम Sikkim 100 100 0 00 106 106 0 00
अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7
परवी कषतर Eastern Region 21658 21658 0 00 23141 22733 408 18
अरणजचल परिश Arunachal Pradesh 133 131 2 15 138 138 0 01
असम Assam 1539 1508 31 20 1865 1809 56 30
मणणपि Manipur 204 199 5 25 219 216 3 12
मघजलय Meghalaya 357 357 0 00 374 372 1 04
ममज़ोिम Mizoram 108 105 3 28 121 119 2 17
नजगजलड Nagaland 127 125 2 16 156 138 18 116
बिपिज Tripura 249 249 0 00 298 293 5 17
उततर-परवी कषतर North-Eastern Region 2540 2535 5 02 2967 2850 117 39
समपणण भारत All India 169464 168745 719 04 177022 175528 1494 08
Note The revised data for March 2019 is not avaliable 26
अधिकतम वरवदयत आपरत ण शथिरत ररपोरण (परवाणरवलोकन) Peak Power Supply Position Report (Provisional)
आकड़ मगज वजट नट Figures in MW net
राजयStateमािण2019 March2019 अपरल2018 -मािण2019 April2018 to March2019
मजग की पनत ा म कमी मजग की पनत ा म कमी Demand not MetDemand not Met
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
Excludes the supply to Bangladesh
अपरल 2019 April2019 अपरल2018 -मािण2019 April2019 to April2019
उततरी कषतर Northern Region
चडीगढ़ Chandigarh(Data Not Received)दिलली Delhi
हरियजणज Haryana
दहमजचल परिश Himachal Pradeshरमम कशमीि Jammu amp Kashmir(Data
Not Received)परजब Punjab
िजरसथजन Rajasthanउतति परिश Uttar Pradesh
उततिजखड Uttarakhand
पशचिमी कषतर Western Region
छततीसगढ़ Chhattisgarh
Apr-Nov 2018- No cuts
Maximum Demand cut-58MW
Energy cut- 00020-00032 MUsday
गरिजत Gujarat
मधय परिश Madhya Pradesh
महजिजषटर Maharashtra
गोवज Goa
दकषकषणी कषतर Southern Region
आनधर परिश Andhra Pradesh
तलगजनज Telangana
कनजाटक Karnataka
किल Kerala
तममल नजड Tamil Nadu
पडचिी Puducherryपरवी कषतर Eastern Region
बबहजि Bihar
झजिखणड Jharkhand
ओडडशज Odisha
पशशचम बगजल West Bengal
No N
otifie
d Cu
ts
27
मािण 2019 म इडथरीर पर वरवदयत करौती का वरवरवरण Notified Power CutsRestrictions on Industries during April2019
राजय कषतर State Regionऊराणमाग करौती EnergyDemand Cut
No N
otifie
d Cu
tsNo
Notifie
d Cu
ts
अपरल2019 April 2019 अपरल2019 -अपरल2019 April2019 to April2019
उततरी कषतर Northern Region
चडीगढ़ Chandigarh Data not received Data not received
दिलली Delhi Data not received Data not received
हरियजणज Haryana 0811 hrsday 0811 hrsday
दहमजचल परिश Himachal Pradesh HPSEBL has only 2 agriculture consumers and uninterrupted
power is being supplied to agriculture sector
HPSEBL has only 2 agriculture consumers and uninterrupted
power is being supplied to agriculture sector
रमम कशमीि Jammu amp Kashmir Data not received Data not received
परजब Punjab 379 hrsday 379 hrsday
िजरसथजन Rajasthan 0630 hrsday 0630 hrsday
उतति परिश Uttar Pradesh 2157 hrsday 2157 hrsday
उततिजखड Uttarakhand 2359 hrsday 2359 hrsday
पशचिमी कषतर Western Region
छततीसगढ़ Chhattisgarh 18 hrsday 18 hrsday
गरिजत Gujarat 8 hrsday 8 hrsday
मधय परिश Madhya Pradesh Three-Phase Supply(Irrigation)- 0953 hrs day Three-Phase
(Mixed) Supply - 2334 hrs day
Three-Phase Supply(Irrigation)- 0953 hrs day Three-Phase
(Mixed) Supply - 2334 hrs day
महजिजषटर Maharashtra Three-Phase Supply(Irrigation)- 9 hrs day Three-Phase Supply(Irrigation)- 9 hrs day
गोवज Goa No restriction No restriction
दकषकषणी कषतर Southern Region
आनधर परिश Andhra Pradesh 07 hrsday 07 hrsday
तलगजनज Telangana 24 hrsday 24 hrsday
कनजाटक Karnataka 6 hrsday 6 hrsday
किल Kerala No Restrictions No Restrictions
तममल नजड Tamil Nadu 9 hrsday (6 hrs during day time and 3 hrs during night time) 9 hrsday (6 hrs during day time and 3 hrs during night time)
पडचिी Puducherry No Restrictions No Restrictions
परवी कषतर Eastern Region
बबहजि Bihar 18 hrsday 18 hrsday
झजिखणड Jharkhand 20 hrsday 20 hrsday
ओडडशज Odisha 24 hrsday 24 hrsday
पशशचम बगजल West Bengal 23 hrsday 23 hrsday
28
मारच 2019 कषि कषतर को षिदयत आपरतच का षििरण Power Supply to Agricultural Sector during March2019
राजय कषतर State Regionऔसत वरवदयत आपरत ण घनरो म Average Hours of Supply
On segregated feeders
SNo Contents Page
1 Growth of Installed Capacity since 6th Plan 29
2 Progress of Transmission Sector since 6th Plan 30
3 All India Yearly Coal consumption for Power Generation (Utilities)
4 All India Annual Per Capita Consumption of Electricity since -2006
5 Average cost of power supply amp Average realisation (Paisakwh)
6 Growth of Rural Electrification amp Pump Sets Energisation
7 Status of Hydro Schemes Cleared by the CEA in Apr-2019
Section G - Growth of Power Sector
31
32
(In MW)
Coal Gas Diesel Total
End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472
End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634
End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537
End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596
End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921
End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703
End of 12th Plan 19216288 2532938 83763 21832988 6780 4447842 50018 31960630
Up to Apr-2019 20070450 2493722 63763 22627934 678000 4539922 7764163 35610019
Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-17) = 51529 MW
Electricity Generation (MU) Targets and Achievements for 2016-17
Coal Gas Diesel Nuclear Hydro Res Total
2007045 2493722 637629 678000 453992 77641625 22925174
29
1 Growth of Installed Capacity Since 6th Plan
Plan YearThermal
Nuclear Hydro RES (MNRE) Total
2007045
2493722637629
678000
4539922
77641625
Total Installed Capacity 35610019 MW
Coal Gas Diesel Nuclear Hydro Res
Progress of Transmission Sector in the Country up to April 2019
1 TRANSMISSION LINES (All fig in CKM)
At the end of
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
6th plan 0 0 0 0 0 0 0 0 0 0 0 0 1831 4198 0 6029 1641 44364 0 46005 3472 48562 0 52034
7th plan 0 0 0 0 0 0 0 0 0 0 0 0 13068 6756 0 19824 4560 55071 0 59631 17628 61827 0 79455
8th plan 0 0 0 0 1634 0 0 1634 0 0 0 0 23001 13141 0 36142 6564 73036 0 79600 31199 86177 0 117376
9th plan 0 0 0 0 3234 1504 0 4738 751 409 0 1160 29345 20033 0 49378 8687 88306 0 96993 42017 110252 0 152269
10th plan 0 0 0 0 4368 1504 0 5872 1775 409 0 2184 48708 24730 0 73438 9444 105185 0 114629 64295 131828 0 196123
11th Plan 0 0 0 0 5948 1504 1980 9432 4839 411 0 5250 71023 30191 5605 106819 10140 125010 830 135980 91950 157116 8415 257481
12th Plan 6124 0 0 6124 5948 1504 1980 9432 25465 1177 4598 31240 92482 48240 17065 157787 11014 151276 978 163268 141033 202197 24621 367851
13th Plan (Up
to Mar2019)6124 0 0 6124 5948 1504 1980 9432 33692 1512 6605 41809 101335 58238 21173 180746 11734 162552 1010 175296 158833 223806 30768 413407
13th Plan (Up
to Apr-19)6124 0 0 6124 5948 1504 1980 9432 33745 1512 6605 41862 101335 58258 21173 180766 11734 162953 1010 175697 158886 224227 30768 413881
27150 600 MW of 132 kV Inter-Regional power transmission capacity links which are operated radially from time to time is not added in the total
75050
47900
24000
99050
30
Grand Total
Note - The figure upto the end of 10th plan in for stringing progress including the lines not commissioned Now only commissioned lines are reckoned Accordingly the figure for 10th plan (end) may read
as 187555 after adjusting with (-) 10852 Ckm
Inter-regional Power Transfer Capacity (MW)
plusmn 800 kV HVDC plusmn 500 kV HVDC 765 kV 400 kV 220 kV
IR addition in 12th
Plan (up to March
2017)
Inter-regional
Transmission
Capacity at the end
of Plan Period 2017-
22 (as on April19)
IR at the end of 11th
PlanIR at the end of 12th
Plan
IR Capacity Addition
at the end of Plan
Period 2017-22 (Till
April 19)
2004-05 27800
2005-06 28100
2006-07 30200
2007-08 33000
2008-09 35500
2009-10 36700
2010-11 38700
2011-12 41756
2012-13 45460
2013-14 48940
2014-15 53040
2015-16 54590
2016-17 57430
2017-18 60800
2018-19 62890
Year
2005-06
2006-07
2007-08
2008-09
2009-10
2010-11
2011-12
2012-13
2013-14
2014-15
2015-16
2016-17
2017-18
2018-19
2004-05 254 209 7568
2005-06 260 221 7636
2006-07 276 227 7423
2007-08 293 239 7727
2008-09 340 263 8713
2009-10 355 268 8870
2010-11 398 303 11975
2011-12 455 330 13514
2012-13 501 376 14867
2013-14 518 175
2014-15 520
Source- PFC Reports on the performance of State Power Utilities 31
1181
7335
7786
91441
8188
88363
957
1010
1075
1122
1149
(GrossGen+ Net Import) Mid-year population Provisional
5 Average cost of power supply amp average realization ( paiseKWH )
Yearcost of supply
(paiseunit)
Realization(paiseunit)
Including AgricultureOnly
Agriculture
6719
7171
3 All India yearly Coal Consumption for Power Generation (Utilities)
YEARCoal Consumption
Million Tonnes
4 All India Annual per Capita consumption of Electricity Since 2006
Per Capita Consumption ( kWh)
6314
Sl
NoExecuting Agency
Installed
Capacity (MW)Cost (Rs crore)
Date of
Clearance
32
Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as
Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received
from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made
available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified
villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is
independent of the earlier published reports
No Hydro Electric Project has been issued concurrenceAppraisal letter by CEA during April 2019
7 Status of Hydro Schemes Cleared by the CEA in Apr-2019
Name of Scheme
1999-002000-01
297594
010408 to 310309010409 to 310310
10th Plan
2005-062006-07
322968331020
6 Growth Of Rural Electrification amp Pumpsets Energisation
Plan Year
9th Plan2002-03
134092626
4111
Pump Sets Energised Villages Electricfied (Nos)
2001-02
284064367244
1218
27801997-981998-99
3207
482864
12632
1576036
4451722594
15455554
2314176
397343611750
2093311060316074
65109527813884
46708
18423975
499150
2003-042004-05
5743
9769
Cumu upto End of 10th Plan
010407 to 310308
010410 to 310311557976840909
010411 to 310312
412667
86293726
No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification
since 2004-05
65291374575 296361511th Plan
Cumu upto End of 11th Plan
596556 21212860
557439Cummulative up to end of 12th Plan
SN Contents Page
1 Rate of sale of power for the year 2016-17 33-41
RATE OF SALE OF POWER FOR THE YEAR 2016-17
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) NORTHERN REGION
CENTRAL SECTOR
BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 18000 66900 19800
CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 54000 222400 21600
CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 30000 144400 19600
CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 23100 91700 42600
PARBATI - III HPS NHPC LTD HYDRO-HYDRO 52000 68200 54800
DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 28000 95600 30000
CHUTAK NHPC LTD HYDRO-HYDRO 4400 22000 79800
DULHASTI HPS NHPC LTD HYDRO-HYDRO 39000 228000 56400
SALAL HPS NHPC LTD HYDRO-HYDRO 69000 342300 11000
TANAKPUR HPS NHPC LTD HYDRO-HYDRO 9420 43000 29600
URI HPS -I NHPC LTD HYDRO-HYDRO 48000 280300 16000
URI HPS - II NHPC LTD HYDRO-HYDRO 24000 147300 48600
NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 4500 24600 88200
SEWA - II NHPC LTD HYDRO-HYDRO 12000 47100 43400
ANTA CCPP NTPC LTD THERMAL-GASN 41930 67539 32400
AURAIYA CCPP NTPC LTD THERMAL-GASN 66336 53501 39100
BADARPUR TPS NTPC LTD THERMAL-COAL 70500 159153 44800
DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 84000 296170 42300
DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 98000 526686 46300
DADRI CCPP NTPC LTD THERMAL-GASHSD 82978 227469 33000
FARIDABAD CCPP NTPC LTD THERMAL-GASN 43159 115577 30800
RIHAND STPS I NTPC LTD THERMAL-COAL 100000 596766 24500
RIHAND STPS II NTPC LTD THERMAL-COAL 100000 737069 24600
RIHAND STPS III NTPC LTD THERMAL-COAL 100000 706546 30600
SINGRAULI STPS NTPC LTD THERMAL-COAL 200000 1394068 20400
TANDA TPS NTPC LTD THERMAL-COAL 44000 295438 40800
UNCHAHAR TPS I NTPC LTD THERMAL-COAL 42000 256454 39800
UNCHAHAR TPS II NTPC LTD THERMAL-COAL 42000 273577 38900
UNCHAHAR TPS III NTPC LTD THERMAL-COAL 21000 142780 43000
KOLDAM NTPC LTD HYDRO-HYDRO 80000 363260 43600
NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 303575 25841
RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 108000 668677 35374
NJHPS SJVNL HYDRO-HYDRO 150000 699496 23820
RAMPUR HPS SJVNL HYDRO-HYDRO 41202 195982 32260
TEHRI HPP THDC HYDRO-HYDRO 100000 272543 51800
KOTESHWAR HEP THDC HYDRO-HYDRO 40000 106244 53400
IGSTPS JHAJJAR ARAVALI P CPL THERMAL-COAL 150000 510429 49490
NEYVELI BARSINGSAR NEYVELI LIG CORP LTD THERMAL-LIG 25000 127520 38040
STATE SECTOR
PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 21000 14222 48200
PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 21000 19205 48400
PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 25000 102257 42600
PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 25000 62107 41800
DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 60000 312213 41000
RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 120000 35767442200
WYC HYDEL STATION HPGCL HYDRO-HYDRO 6240 20365 24900
GIRI POWER HOUSE HPSEB HYDRO-HYDRO 6000 13958 7600
ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 1695 5467 11900
BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 12000 18528 6700
GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 2250 7462 22500
BASSI POWER HOUSE HPSEB HYDRO-HYDRO 6600 29649 7500
BINWA POWER HOUSE HPSEB HYDRO-HYDRO 600 2749 19300
ANNEXURE-I
RATE OF SALE OF POWER FOR THE YEAR 2016-2017
Page 33
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) GAJ POWER HOUSE HPSEB HYDRO-HYDRO 1050 2914 26700
BANER POWER HOUSE HPSEB HYDRO-HYDRO 1200 2864 16200
HOLI POWER HOUSE HPSEB HYDRO-HYDRO 300 616 22500
THIROT POWER HOUSE HPSEB HYDRO-HYDRO 450 1126 22500
KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 1200 3064 22500
LARJI POWER HOUSE HPSEB HYDRO-HYDRO 12600 53677 23700
NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 250 750 31000
CHABA POWER HOUSE HPSEB HYDRO-HYDRO 175 465 23300
RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 150 101 13400
SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 200 000 22500
KILLAR HPSEB HYDRO-HYDRO 030 050 22500
BHABA AUGUMENP H HPSEB HYDRO-HYDRO 450 1276 22500
BS CHAMBA HPSEB HYDRO-HYDRO 045 099 19500
GUMMA HPSEB HYDRO-HYDRO 300 423 22500
GAS TURBINE POWER STATION IPGCL THERMAL-GAS 27000 67233 39300
PPS-I PPCL THERMAL-GAS 33000 175905 38300
PPS-III PPCL THERMAL-GAS 137120 196879 36100
LOWER JHELUM JampKPDD HYDRO-HYDRO 10500 60214 5100
UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 2260 10514 6300
UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 10500 44202 8500
GANDHARBAL JampKPDD HYDRO-HYDRO 1500 8925 4700
KARNAH MPH JampKPDD HYDRO-HYDRO 200 1122 31000
CHENANI I JampKPDD HYDRO-HYDRO 2330 10892 6600
CHENANI II JampKPDD HYDRO-HYDRO 200 1188 9300
CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 750 3634 14200
IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 375 2108 18500
IGO MERCHELLONG JampKPDD HYDRO-HYDRO 300 1572 29700
PAHALGAM MHP JampKPDD HYDRO-HYDRO 450 1713 32900
MARPACHOO JampKPDD HYDRO-HYDRO 075 375 29800
HAFTAL JampKPDD HYDRO-HYDRO 100 483 28700
SANJAK JampKPDD HYDRO-HYDRO 126 441 36000
SEWA-III JampKPDD HYDRO-HYDRO 900 3273 20200
BHADERWAH JampKPDD HYDRO-HYDRO 150 935 8900
BAZGO JampKPDD HYDRO-HYDRO 030 108 33300
SUMOOR JampKPDD HYDRO-HYDRO 010 045 35400
HUNDER JampKPDD HYDRO-HYDRO 040 176 26200
STAKNA JampKPDD HYDRO-HYDRO 400 1933 4100
KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 124000 662879 31360
SURATGARH TPS RRVUNL THERMAL-COAL 150000 402328 41730
CHHABRA TPS 1amp 2 RRVUNL THERMAL-COAL 50000 305946 36700
CHHABRA TPS 3 RRVUNL THERMAL-COAL 25000 151536 36700
CHHABRA TPS 4 RRVUNL THERMAL-COAL 25000 155896 36700
RAMGARH GT POWER PROJECT RRVUNL THERMAL-COAL 22050 43177 41800
RAMGARH GAS T P PROJECT 3 RRVUNL THERMAL-GAS 5000 93615 41800
DHOLPUR C C POWER PROJECT RRVUNL THERMAL-R-LNG 33000 9486 46110
MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 14000 20855 34192
MINI MICRO HYDEL (MMH) P S RRVUNL HYDRO-HYDRO 2385 851 37800
KALISINDH TPP 1 RRVUNL THERMAL-COAL 60000 341543 45000
KALISINDH TPP 2 RRVUNL THERMAL-COAL 60000 211588 45000
KHARA HEP UPJVNL HYDRO-HYDRO 7200 26654 7200
MATATILLA HEP UPJVNL HYDRO-HYDRO 3060 12219 6500
OBRA HEP UPJVNL HYDRO-HYDRO 9900 21517 6300
RIHAND UPJVNL HYDRO-HYDRO 30000 57369 5500
ANPARA A TPS UPRVUNL THERMAL-COAL 63000 317536 27000
ANPARA B TPS UPRVUNL THERMAL-COAL 100000 705605 22700
ANPARA D UPRVUNL THERMAL-COAL 100000 300158 39800
HARDUAGANJ TPS UPRVUNL THERMAL-COAL 16500 45817 49200
HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 50000 304389 46600
OBRA A TPS UPRVUNL THERMAL-COAL 28800 13158 34000
OBRA B TPS UPRVUNL THERMAL-COAL 100000 328124 21900
Page 34
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) PANKI TPS UPRVUNL THERMAL-COAL 21000 66488 50300
PARICHHA TPS UPRVUNL THERMAL-COAL 22000 38762 49400
PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 42000 231931 45600
PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 50000 276722 50400
CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 24000 70845 8290
CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 14400 75366 8390
DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 3375 9595 12080
DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 5100 18701 10520
KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4140 17359 12330
KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 12000 33001 9420
KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 3000 11953 8320
TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 9000 33983 12460
MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 30400 124510 16110
RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 19800 17897 10550
MPUR UTTARAKHAND JVNL HYDRO-HYDRO 930 5121 19200
PATHRI UTTARAKHAND JVNL HYDRO-HYDRO 2040 11636 14200
GALOGI UTTARAKHAND JVNL HYDRO-HYDRO 300 648 12500
PRIVATE SECTOR
MGTPP CLP INDIA PVT LTD THERMAL-COAL 132000 268902 41940
SHRINAGAR HEP ALAKNANDA HPCL HYDRO-HYDRO 33000 127414 48800
GAMA INFRAPROP CCPP GAMA INFRAPROP PVT THERMAL-GAS 22500 52686 47000
PPGCL (BARA) JP POWER VENTURES LTD THERMAL-COAL 198000 448200 38500
MALANA HEP MALANA PCL HYDRO-HYDRO 8600 26354 29792
MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 10000 30369 32580
ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 19200 56347 36079
KASHANG HEP H P PCL HYDRO-HYDRO 19500 5034 29200
BASPA-II HEP HBPCL HYDRO-HYDRO 30000 132769 13600
KARCHAM WANGTOO HEP HBPCL HYDRO-HYDRO 100000 434386 36600
RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 108000 582600 43700
RITHALA COMBI CY POWER PLANT TATA POWER DDL THERMAL-GAS 9480 000 11900
RAJPURA TPS NABHA POWER LTD THERMAL-GAS 140000 901484 39000
TALWANDI SABO POWER LTD TALWANDI SABO POWER LTD THERMAL-COAL 198000 636040 49548
ROJA THERMAL POWER STATION ROJA POWER SCL THERMAL-COAL 120000 727200 43400
KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 34400 63400
BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 36000 62600
MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 38200 60800
UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 37900 61500
KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 42300 58800
LALITPUR PGCL BAJAJ ENERGY PVT LTD THERMAL-COAL 198000 359400 47300
PRAYAGRAJ PGCL PRAYAGRAJ PGCL THERMAL-COAL 132000 448200 38595
KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 132000 783182 33438
WESTERN REGION
CENTRAL SECTOR
INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 100000 325333 23892
OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 52000 141663 34001
GANDHAR CCPP NTPC LTD THERMAL-GAS 65739 221924 28700
KAWAS CCPP NTPC LTD THERMAL-GASN 65620 167929 27000
KORBA I amp II NTPC LTD THERMAL-COAL 210000 1499171 20500
KORBA III NTPC LTD THERMAL-COAL 50000 358746 26600
SIPAT STPS I NTPC LTD THERMAL-COAL 198000 1479902 26800
SIPAT STPS II NTPC LTD THERMAL-COAL 100000 766549 26500
VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 126000 693142 25800
VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 100000 608781 23800
VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 100000 673475 27600
VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 100000 655924 32900
VINDHYACHAL STPS V NTPC LTD THERMAL-COAL 50000 328265 31700
MOUDA I NTPC LTD THERMAL-COAL 100000 343130 44500
MOUDA Ii NTPC LTD THERMAL-COAL 66000 40637 39900
RATNAGIRI GAS amp POWER PVT LTD RGPPL THERMAL-GAS 196708 442485 47000
KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 000 24729
TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 32000 201227 10740
Page 35
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 365122 19069
TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 787444 29324
STATE SECTOR
GSEG-HAZIRA15610 MW GUJARAT S ENEGEN LTD THERMAL-GAS 15610 1805 28200
GSEG-HAZIRA35143 MW GUJARAT S ENEGEN LTD THERMAL-GAS 35130 22276 51300
GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 21978 51800
AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 13929 26100
KORBA TPS EAST CSPGCL THERMAL-COAL 44000 198673 33880
DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 365808 27570
KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 316500 30420
HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 532878 19410
CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 515 58300
MTTPS CHAMPA U-I CSPGCL THERMAL-COAL 50000 220376 39000
MTTPS CHAMPA U-II CSPGCL THERMAL-COAL 50000 23709 10000
SHP GANGREL CSPGCL HYDRO-HYDRO 1000 2350 36790
BANGO HEP CSPGCL HYDRO-HYDRO 12000 14662 8900
MHP KORBA WEST CSPGCL HYDRO-HYDRO 170 859 38190
SIKASAR HEP CSPGCL HYDRO-HYDRO 700 418 26870
DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8843 74500
DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 19446 51500
GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 66388 71600
GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127488 41300
KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 96072 43900
KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 29841 56400
SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 184966 58800
UKAI 1-5 GSECL THERMAL-COAL 85000 204891 46900
UKAI TPS 6 GSECL THERMAL-COAL 50000 284448 48200
WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 271999 58300
WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 82808 44100
KADANA HPS GSECL HYDRO-HYDRO 24200 34433 16800
UKAI HPS GSECL HYDRO-HYDRO 30500 40585 6100
TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 123000 11500
BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 8900 10900
BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 7200 27500
JHINNA HPS MPPGCL HYDRO-HYDRO 2000 9700 18500
RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 44300 3400
GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 17300 4600
SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 4100 16900
MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 14600 27000
PENCH HPS MPPGCL HYDRO-HYDRO 16000 23700 8100
RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 3000 16900
AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 134400 35100
SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 283800 38700
SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 344600 34300
SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 111600 61600
SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 211800 58000
SSTPS PH-I MPPGCL THERMAL-COAL 120000 233100 84300
BHUSAWAL TPS MSPGCL THERMAL-COAL 142000 566258 51100
CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1365682 33700
KHAPERKHEDA MSPGCL THERMAL-COAL 134000 706207 39100
KORADI TPS MSPGCL THERMAL-COAL 62000 443206 42000
NASIK TPS MSPGCL THERMAL-COAL 63000 297275 47000
PARLI TPS MSPGCL THERMAL-COAL 113000 175934 71600
PARAS MSPGCL THERMAL-COAL 50000 267931 38700
URAN CCPP MSPGCL THERMAL-GAS 67200 320330 30600
KOYANA MSPGCL HYDRO-HYDRO 195600 328155 13100
SMALL HYDRO POWER PLANTS MSPGCL HYDRO-HYDRO 45400 93062 30500
BHIRA MSPGCL HYDRO-HYDRO 8000 10046 8400
TILLARI MSPGCL HYDRO-HYDRO 8900 10584 3100
SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 233298 20500
SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 87633 20500
PRIVATE SECTOR
Page 36
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 81282 46750
JNSTPP(JAYPEE NIGRIE) JP POWER VENTURES LTD THERMAL-COAL 132000 726695 29310
MB POWER MB POWER THERMAL-COAL 120000 345632 38310
ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 754922 28671
ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 780761 23495
ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 198000 1263784 32090
ADANI POWER MAHARA ADANI POWER LTD THERMAL-COAL 330000 1666191 34124
AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 170065 36827
SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 252035 45129
ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 458551 36000
ESSAR POWER MP LTD ESSAR POWER MP LTD THERMAL-COAL 60000 243040 28600
VEDANTA LTD (P P -I) VEDANTA LTD THERMAL-GAS 3000 15044 24000
VEDANTA LTD (P P -II) VEDANTA LTD THERMAL-GAS 3000 21293 24000
PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 8234600 24000
165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 5850 64390
145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 68717 40349
SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 132655 28776
SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 144686 38567
MUNDRA UMPPCOASTAL GUJARAT POWER
LTD THERMAL-IMP COAL 400000 2530300
23900
LANCO AMARKANTAK TPP PATHADIH
U-ILANCO AMARKAN POWER LTD THERMAL-COAL 30000 195500
29200
LANCO AMARKANTAK TPP PATHADIH
U-IILANCO AMARKAN POWER LTD THERMAL-COAL 30000 206900
27600
BARADARHA TPS D B POWER LTD THERMAL-COAL 120000 677373 29200
JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 405000 28900
JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 453000 40500
DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 339437 40700
TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 293400 44000
TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 137200 37000
TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 174900 44000
BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 92900 14100
BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23700 34300
KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 27600 48300
CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2530300 23900
BHANDARDRA HEP -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 2475 54900
SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 161400 26500
SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 445000 39000
SOTHERN REGION
CENTRAL SECTOR
NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 325699 54820
NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 305532 39880
NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 998805 38510
NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 113016 54070
NEYVELI TAMILNADU POWER LTD JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 625274 42200
VALLUR TPS NTPC TECL THERMAL-COAL 150000 856438 42350
R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 1493 84300
RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1502919 29400
RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 341291 31800
SIMHADRI I NTPC LTD THERMAL-COAL 100000 688382 36800
SIMHADRI II NTPC LTD THERMAL-COAL 100000 663657 43400
KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 593110 31324
MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 291625 21764
KKNPP-1 amp 2 NPCIL NUCLEAR-NUCLEAR 200000 572609 40948
MINICOY LAKSHADEEP THERMAL-DIESEL 340 770 29600
KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1097 29600
AMINI LAKSHADEEP THERMAL-DIESEL 265 509 29600
ANDROTT LAKSHADEEP THERMAL-DIESEL 219 524 29600
KALPENI LAKSHADEEP THERMAL-DIESEL 175 356 29600
AGATTI LAKSHADEEP THERMAL-DIESEL 195 658 29600
KADMAT LAKSHADEEP THERMAL-DIESEL 190 414 29600
KILTAN LAKSHADEEP THERMAL-DIESEL 150 269 29600
CHETLET LAKSHADEEP THERMAL-DIESEL 100 139 29600
BITRA LAKSHADEEP THERMAL-DIESEL 043 024 29600
BANGARAM LAKSHADEEP THERMAL-DIESEL 018 009 29600
Page 37
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) STATE SECTOR
Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 721811 46500
Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 50000 336142 46500
RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 237358 46500
RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 239926 46500
RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 124500 46500
SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 62109 46500
UPPER SILERU APGENCO HYDRO-HYDRO 24000 33000 46500
LOWER SILERU APGENCO HYDRO-HYDRO 46000 81066 46500
DONKARAI APGENCO HYDRO-HYDRO 2500 6007 46500
PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 1262 46500
CHETTIPETA APGENCO HYDRO-HYDRO 100 214 46500
MUCHKUND APGENCO HYDRO-HYDRO 12000 37571 46500
NAGARJUNASAGAR RCPH APGENCO HYDRO-HYDRO 9000 606 46500
TUNGABHADRA HES amp HAMPI(AP
Share)
APGENCO HYDRO-HYDRO 7200 6100 46500
KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 352232 42600
KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 288131 32500
KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 319272 46500
RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 40073 44300
KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 308317 46000
KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 308963 51300
SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 61004 76600
NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 17960 75300
PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 20873 58300
POCHAMPAD-I TSPGENCO HYDRO-HYDRO 2700 5455 29800
POCHAMPAD-II TSPGENCO HYDRO-HYDRO 900 1932 40700
NIZAMSAGAR TSPGENCO HYDRO-HYDRO 1000 1126 53400
RAICHUR TPS 1 to 7 KPCL THERMAL-COAL 147000 890866 43800
RAICHUR TPS 8 KPCL THERMAL-COAL 25000 159523 48200
BELLARI TPS 1 KPCL THERMAL-COAL 50000 318679 51100
BELLARI TPS 2 KPCL THERMAL-COAL 50000 232347 55600
BELLARI TPS 3 KPCL THERMAL-COAL 70000 47565 34400
BHADRA PH KPCL HYDRO-HYDRO 3920 2369 45900
GERUSUPPA PH KPCL HYDRO-HYDRO 24000 26990 22000
GHAT PRABHA HEP KPCL HYDRO-HYDRO 3200 4777 25300
KADRA HPS KPCL HYDRO-HYDRO 15000 16889 26800
NAGJHARI KPCL HYDRO-HYDRO 90000 155159 9800
KODASALLI DPH KPCL HYDRO-HYDRO 12000 14854 19200
MUNIRA+MGH+SPH+SPH KPCL HYDRO-HYDRO 22640 48211 7900
SHARAVATHY HPS KPCL HYDRO-HYDRO 108550 276215 5400
ALMATTI DPH KPCL HYDRO-HYDRO 29000 39611 24600
VARAHI UGPH KPCL HYDRO-HYDRO 46000 71368 15600
IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 17196 15300
IDUKKI HPS KSEB HYDRO-HYDRO 78000 137905 15300
KAKKAD HPS KSEB HYDRO-HYDRO 5000 13063 15300
KALLADA HPS KSEB HYDRO-HYDRO 1500 4436 15300
KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 46544 15300
KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 635 15300
LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 30822 15300
MALANKARA HPS KSEB HYDRO-HYDRO 1050 2474 15300
MATTUPETTY KSEB HYDRO-HYDRO 200 230 15300
MALAMPUZHA KSEB HYDRO-HYDRO 250 063 15300
CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 864 15300
URUMI ST I amp II KSEB HYDRO-HYDRO 615 903 15300
LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 248 15300
NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7765 19625 15300
PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 16601 15300
PANNIAR HPS KSEB HYDRO-HYDRO 3240 6217 15300
PORINGALKUTHU KSEB HYDRO-HYDRO 3600 10052 15300
PORINGALKUTHU LBE KSEB HYDRO-HYDRO 1600 9438 15300
PEPPARA KSEB HYDRO-HYDRO 300 395 15300
POOZHITHODE KSEB HYDRO-HYDRO 480 1045 15300
Page 38
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) PEECHI KSEB HYDRO-HYDRO 125 040 15300
RANI-PERUNADU KSEB HYDRO-HYDRO 400 585 15300
SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 79783 15300
SENGULAM HPS KSEB HYDRO-HYDRO 5120 11558 15300
SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 16711 15300
VILANGAD KSEB HYDRO-HYDRO 750 1578 15300
BARAPOLE KSEB HYDRO-HYDRO 1500 1932 15300
VELLATHOOVAL KSEB HYDRO-HYDRO 360 305 15300
CHIM0NY KSEB HYDRO-HYDRO 250 156 15300
ADYANPARA KSEB HYDRO-HYDRO 350 501 15300
BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 554 15300
KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 3801 15300
KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 23132 32800
ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 14416 62280
METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 523970 62280
METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 321270 62280
NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 336575 62280
NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 591240 62280
TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 508966 62280
KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 30897 62280
VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 18720 90699 62280
KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 33593 62280
BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 1047 62280
PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 1250 62280
PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 330 62280
MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 4897 62280
MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 032 62280
KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15681 62280
KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 40608 62280
KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 21342 62280
KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 4717 62280
KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4322 62280
KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2399 62280
METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 4416 62280
METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 8035 62280
BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2187 62280
BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2359 62280
BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2511 62280
BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 1949 62280
BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 1819 62280
POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 172 62280
SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 241 62280
MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 026 62280
THIRUMOORTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 136 62280
PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 9309 62280
VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 353 62280
SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 4192 62280
PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 6571 62280
SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 1186 62280
SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6319 62280
ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 6122 62280
KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 28674 62280
SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 18381 62280
SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 4258 62280
KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 12680 62280
KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4201 62280
ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 000 62280
PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 19175 62280
AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 078 62280
BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 504 62280
BHAVANI KATTALAI (BKB)(IIIampIII BB I amp II)TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 5847 62280
PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 000 62280
Page 39
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) SRI DAMODARAM STPS APPDCL THERMAL-COAL 160000 808108 36300
PRIVATE SECTOR
KARUPPUR TANJORE LANCO TANJORE PCL THERMAL-GAS 12000 48096 28770
SIMHAPURI ENERGY LTD SIMHAPURI ENERGY LTD THERMAL-COAL 60000 143900 39100
JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 7111 45500
SBU 1 JSW ENERGY LTD
VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 26000 159100
43300
SBU 2 JSW ENERGY LTD
VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 60000 247900
42800
LANCO KPLLANCO KONDAPALLI POWER
LTDTHERMAL-GAS 36814 85060
25776
LANCO KPL STG -IILANCO KONDAPALLI POWER
LTDTHERMAL-GAS 36600 12979
46330
LANCO KPL STG -IIIALANCO KONDAPALLI POWER
LTDTHERMAL-GAS 37100 85710
46330
LANCO KPL STG -III BLANCO KONDAPALLI POWER
LTDTHERMAL-GAS 37100 43639
46330
HINDUJA NATIONAL PCL HINDUJA NATIONAL PCL THERMAL-COAL 104000 303000 38200
MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 121164 49940
UDUPI POWER COR LTD ADANI POWER LTD THERMAL-COAL 120000 754613 42500
SPECTRUM POWER GENERATION
LTD SPECTRUM PG LTD THERMAL-GASN 20525 9256812
34952
TAQA NEYVELI POWER COM PVT
LTD TAQA NEYVELI THERMAL-LIG 25000 5840
34500
ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 251000 51000
ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 207860 36800
GMR VEMAGIRI POWER GENERATION
LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 30117
46450
EASTERN REGION
CENTRAL SECTOR
MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 64675 53113
MTPS STAGE - II KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 39000 1432 69138
BOKARO `B` TPS DVC THERMAL-COAL 63000 145670 31539
MEJIA TPS U 1-3 DVC THERMAL-COAL 63000 348298 31552
MEJIA TPS U 4 DVC THERMAL-COAL 21000 116099 34997
MEJIA TPS U 5-6 DVC THERMAL-COAL 50000 276427 35976
MEJIA TPS U 7-8 DVC THERMAL-COAL 100000 552854 36991
DURGAPUR STEEL TPS DVC THERMAL-COAL 100000 665550 39323
DURGAPUR TPS DVC THERMAL-COAL 21000 59270 35416
RAGHUNATHPUR TPS DVC THERMAL-COAL 120000 201650 35326
MAITHON HYDEL STA DVC HYDRO-HYDRO 6320 12200 17984
CHANDRAPURA TPSU1-3 DVC THERMAL-COAL 42000 257610 35095
CHANDRAPURA TPSU7-8 DVC THERMAL-COAL 50000 306673 34987
KODERMA TPS DVC THERMAL-COAL 100000 380180 38131
PANCHET HPS DVC HYDRO-HYDRO 8000 13360 17984
TILLAYA HPS DVC HYDRO-HYDRO 400 1410 17984
RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34700 35400
TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 277300 23200
TLDP -III NHPC LTD HYDRO-HYDRO 13200 55400 62000
TLDP -IV NHPC LTD HYDRO-HYDRO 16000 60300 25600
FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 957219 33700
FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 308943 41000
BONGAINGAON TPS NTPC LTD THERMAL-COAL 25000 153663 58600
KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 542277 34200
KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 942591 34200
BARH-II NTPC LTD THERMAL-COAL 132000 728021 44500
TALCHER TPS NTPC LTD THERMAL-COAL 46000 335521 30100
TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 702319 25600
TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1436521 24700
STATE SECTOR
BTPS(RampM) BIHAR STATE PGCL THERMAL-COAL 22000 12142 39700
BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 98331 10602
HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 50593 9482
CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 19689 2605
RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 53192 6033
UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 147208 14637
Page 40
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 60353 4519
IB TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 288567 25000
J P H GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 210 038 61100
MEYONG CHU GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 400 1086 61100
TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 122667 38200
DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 214339 43321
KOLAGHAT THERMAL POWER
STATION
WEST BENGAL PDCL THERMAL-COAL 126000 538269 31603
BAKRESHWAR THERMAL POWER
PLANT
WEST BENGAL PDCL THERMAL-COAL 105000 634876 32154
BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 45000 166855 33299
SANTHALDIH THERMAL POWER
STATION
WEST BENGAL PDCL THERMAL-COAL 50000 336442 34932
SAGARDIGHI THERMAL POWER
PROJECT
WEST BENGAL PDCL THERMAL-COAL 160000 423121 34705
JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 20344 68900
RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 24559 68900
TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 4623 68900
PURULIA PUMPED STORAGE
PROJECT
WEST BENGAL SEDCL HYDRO-HYDRO 90000 108816 68900
MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2768 68900
PRIVATE SECTOR
CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 49474 20230
CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 555500 70200
HALDIA ENERGY HALDIA ENERGY LTD THERMAL-COAL 60000 371000 50400
DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3688 63400
KAMALANGA TPS GMR KAMALANGA ENERGY LTD THERMAL-COAL 105000547670
33300
ADHUNIK POWER U-1 ADHUNIK POWER THERMAL-COAL 27000 158 44060
ADHUNIK POWER U-2 ADHUNIK POWER THERMAL-COAL 27000 168 44250
VL-JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 332800 23622
JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 43000 45250
JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 71700 37030
JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 70700 35920
JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 71100 38870
JOJOBERA UNIT 5 TATA POWER COM LTD THERMAL-COAL 12000 79300 44560
JOJOBERA UNIT 6 TATA POWER COM LTD THERMAL-WHR 12000 83700 12840
IEL KALINGANAGAR U-I TATA POWER COM LTD THERMAL-WG 6750 33400 22500
IEL KALINGANAGAR U-II TATA POWER COM LTD THERMAL-WG 6750 34800 22500
MAITHON UNIT 1 amp 2 TATA POWER COM LTD THERMAL-COAL 105000 678000 36100
HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 27500 24340
HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 28400 24340
HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 15800 24310
NORTH EASTERN REGION
CENTRAL SECTOR
LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 74100 36600
AGARTALA GT NEEPCO THERMAL-GAS 13500 88611 27210
ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 153111 32310
DOYANG HEP NEEPCO HYDRO-HYDRO 7500 25598 49801
KOPILI HEP NEEPCO HYDRO-HYDRO 20000 98186 11491
KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 19582 20237
KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 10310 17968
RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 124093 22945
TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 10100 17344 39000
STATE SECTOR
HYDRO POWER (122 Stns) ITANAGAR GOVT OF ARUNACHAL
PRADESHHYDRO-HYDRO 6971 6217270
24600
KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39514 17337
LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 82327 36810
NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 33318 48290
MYNTRIANG SHEP ST II ASSAM POWER GENCO HYDRO-HYDRO 300 567 35776
LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 9130 49200
LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 012 49200
DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 022 49200
TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 000 49200
UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 4990 16000
UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 6476 37000
UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 16494 14600
UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 3600 9556 15000
SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 758 8000
MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44070 44800
KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 154 41400
TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 091 41400
MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 411 41400
MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 394 41400
KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 760 41400
SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 3264 41400
LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 044 41400
BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 18953 28000
ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 43585 28200
GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 4080 11100
Note
LIG Lignite N Naptha WHR Waste Heat Recovery
Page 41
SrNo Contents Page
1 Executive summary of Target and Achievement of Transmission Lines during 2019-20
20(1)
2 List of Transmission Lines CommissionedReady for commissioning during Apr-2019 20(2)
Section C - Transmission Lines
1 Executive summary of Target and Achievement of Transmission Lines during 2019-20 As on 30-04-19
(All figures in circuit kms)
Ce
ntr
al S
ecto
r
Sta
te S
ecto
r
JV
Pri
va
te S
ecto
r
To
tal
Ce
ntr
al S
ecto
r
Sta
te S
ecto
r
JV
Pri
va
te S
ecto
r
To
tal
Ce
ntr
al S
ecto
r
Sta
te S
ecto
r
JV
Pri
va
te S
ecto
r
To
tal
Ce
ntr
al S
ecto
r
Sta
te S
ecto
r
JV
Pri
va
te S
ecto
r
To
tal
Ce
ntr
al S
ecto
r
Sta
te S
ecto
r
JV
Pri
va
te S
ecto
r
To
tal
Ce
ntr
al
Se
cto
r
Sta
te S
ec
tor
JV
Pri
va
te S
ec
tor
Gra
nd
To
tal
0 0 0 0 0 0 0 0 2727 958 2334 6019 2239 3416 1143 6798 781 10023 0 10804 5747 14397 3477 23621
Apr19 Programme 0 0 0 0 0 0 0 0 577 416 557 1550 60 890 203 1153 0 309 0 309 637 1615 760 3012
Achievement 0 0 0 0 0 0 0 0 53 0 0 53 0 20 0 20 0 401 0 401 53 421 0 474
Upto Apr-19 Programme 0 0 0 0 0 0 0 0 577 416 557 1550 60 890 203 1153 0 309 0 309 637 1615 760 3012
Achievement 0 0 0 0 0 0 0 0 53 0 0 53 0 20 0 20 0 401 0 401 53 421 0 474
20(1)
220 kV Grand Total 800 kV 500 kV
Programme 2019-20
Programme
Achievement
HVDC765 kV 400 kV
Line
1 2 3 4 5 6
1 400 Bhadla (PG) - Bhadla (RVPN) line DC PGCIL 53
53
2 400 LILO of one ckt Jhanor - Navsari at Vav Ss DC GETCO 20
3 220 Banda-Chitrakoot Line DC UPPTCL 226
4 220 Gorakhpur (PG)-Gola line DC UPPTCL 82
5 220 Hapur(765) - Faridnagar line SC UPPTCL 11
6 220 Kalikiri - Madanapalli line DC APTRANSCO 60
7 220LILO of Gr Noida -Noida Sec-129 at Noida
Sec-148DC UPPTCL 1
8 220LILO of one Ckt of Badshahpur Pali at Sec-
65 GurgaonDC HVPNL 3
9 220 Sultanpur-Sangipur LILO Section at Amethi DC UPPTCL 18
421
0
474
20(2)
Grand Total
2Transmission Lines (220 kV and above) CommissionedReady for commissioning During Apr-2019
Voltage
Level (kV)Name of Transmission Lines
Circuit
Type
Executing
Agency
CENTRAL SECTOR
Total of CENTRAL SECTOR
STATE SECTOR Sector
Total of STATE SECTOR
PRIVATE SECTOR
Total of PRIVATE SECTOR
SlNo
Length(CKm)
As on 30-04-19
SN Contents Page
1 Executive summary of Target and Achievement of Substations during 2019-20 21(1)
2Sub Stations (220 kV and above) commissionedready for commisssioning during Apr-
201921(2)
Section D - Sub Stations
1 Executive summary of Target and Achievement of Substations during 2019-2020 As on 30-04-19
(All figures in circuit MVA)
Ce
ntr
al S
ecto
r
Sta
te S
ecto
r
JV
Pri
va
te S
ecto
r
To
tal
Ce
ntr
al S
ecto
r
Sta
te S
ecto
r
JV
Pri
va
te S
ecto
r
To
tal
Ce
ntr
al S
ecto
r
Sta
te S
ecto
r
JV
Pri
va
te S
ecto
r
To
tal
Ce
ntr
al S
ecto
r
Sta
te S
ecto
r
JV
Pri
va
te S
ecto
r
To
tal
Ce
ntr
al S
ecto
r
Sta
te S
ecto
r
JV
Pri
va
te S
ecto
r
To
tal
Ce
ntr
al S
ec
tor
Sta
te S
ec
tor
JV
Pri
va
te S
ec
tor
Gra
nd
To
tal
3000 0 0 3000 0 0 0 0 18000 3000 6000 27000 5205 19665 4260 29130 800 21786 0 22586 27005 44451 10260 81716
Apr19 Programme 0 0 0 0 0 0 0 0 3000 0 3000 6000 0 1000 2000 3000 0 800 0 800 3000 1800 5000 9800
Achievement 0 0 0 0 0 0 0 0 500 0 0 500 815 1980 0 2795 0 1305 0 1305 1315 3285 0 4600
Upto Apr-19 Programme 0 0 0 0 0 0 0 0 3000 0 3000 6000 0 1000 2000 3000 0 800 0 800 3000 1800 5000 9800
Achievement 0 0 0 0 0 0 0 0 500 0 0 500 815 1980 0 2795 0 1305 0 1305 1315 3285 0 4600
21(1)
220 kV Grand Total 800 kV 500 kV
Programme 2019-20
Programme
Achievement
HVDC765 kV 400 kV
As on 30-04-19
Sl Voltage Ratio Capacity
No (kVkV) (MWMVA)
1 2 3 4 5
1 Bhadla SS (3x1500 3x500 MVA) 765400 PGCIL 500
2 Extn at Tumkur (Pavagada ) PS (2x500 MVA) 400220 PGCIL 500
3 Bongaigaon (2nd ICT) Ss 400220 PGCIL 315
Total of CENTRAL SECTOR 1315
4 Motiram Adda Gorakhpur (Aug) (Additional TF) 400220 UPPTCL 240
5 Muradnagar-II Ghaziabad (Aug) (Additional TF) 400220 UPPTCL 240
6 Noida Sec- 148 GBNagar (New) 400220 UPPTCL 5007 Sarnath Varanasi (Aug) TF- II (500-315) 400220 UPPTCL 1858 Sarojininagar Lucknow Aug) TF- II (500-315) 400220 UPPTCL 185
9 Unnao (Aug) TF-III 400220 UPPTCL 31510 Nawada SS 400220 HVPNL 31511 Kharepatan SS 22033 MSETCL 2512 Prathipadu SS 220132 APTRANSCO 10013 Pali Ss 22066 HVPNL 160
14 A-5 Faridabad Ss 22066 HVPNL 60
15 Rentachintala Ss Aug(3X100-2x100) 220132 APTRANSCO 10016 Amethi Ss 220132 UPPTCL 160
17 Gajokhar Varanasi (Aug) TF- II (160-100) 220132 UPPTCL 60
18 Gola Gorakhpur (New) 220132 UPPTCL 160
19 Khurja Bulandshahr (Aug) TF- II (200-160) 220132 UPPTCL 40
20 RC Green GB Nagar (Aug) TF-II (160-100) 220132 UPPTCL 60
21 Sikandrabad Bulandshahr (Aug) (Additional TF) 220132 UPPTCL 160
22 Sitapur (Aug) (Additional TF) 220132 UPPTCL 160
23 Sohawal Ayodhya (Aug) TF-II (160-100) 220132 UPPTCL 60
TOTAL STATE SECTOR 3285
GRAND TOTAL 4600
21(2)
CENTRAL SECTOR
STATE SECTOR
2Sub-Stations (220 kV and above) CommissionedReady for commissioning During Apr-2019
Name of Sub Stations Executing Agency
SN Contents Page
1 Electricity Generation (MU) Targets and Achievements for 2019-20 22
Section E - Electricity Generation
Programme Achievement Ach Programme Achievement Ach
Central Sector 37545100 3177900 3129530 9848 3177900 3129530 9848
State Sector 37498600 3322500 2950558 8881 3322500 2950558 8881
PvtIPP Sector 37346200 3236400 3195940 9875 3236400 3195940 9875
PvtUTL Sector 1823100 159300 165579 10394 159300 165579 10394
Total 114213000 9896100 9441607 9541 9896100 9441607 9541
Central Sector 5661700 386100 481390 12468 386100 481390 12468
State Sector 6680500 498200 536514 10769 498200 536514 10769
PvtIPP Sector 1206900 57300 80405 14032 57300 80405 14032
PvtUTL Sector 144100 12300 10930 8886 12300 10930 8886
Total 13693200 953900 1109239 11628 953900 1109239 11628
Central Sector 4472000 367300 317765 8651 367300 317765 8651
Total 4472000 367300 317765 8651 367300 317765 8651
Bhutan Import 621800 17500 24396 13941 17500 24396 13941
Central Sector 47678800 3931300 3928685 9993 3931300 3928685 9993
State Sector 44179100 3820700 3487072 9127 3820700 3487072 9127
Pvt Sector 40520300 3465300 3452854 9964 3465300 3452854 9964
Total 133000000 11234800 10893007 9696 11234800 10893007 9696
Provisional based on actual-cum-Assesment
Figs in MU
Cummulative
Achievement
Cummulative
Achievement
Mar-19 Mar-18 Upto Mar-2019 Upto Mar-2018
984785 869291 12675910 10183949
22
1 Electricity Generation (MU) Targets and Achievememts for 2019-20
All India Energy Generation During Apr-19 to Apr-19 (MU)
Target (2019-20)Apr-19 to Apr-19
Sector
Hydro
Thermal
Nuclear
Renewable Energy Generation
Achievement
Apr-2019
98961
95393673
112348
94416
11092
3178
108930
0
20000
40000
60000
80000
100000
120000
Thermal Hydro Nuclear Total
Programme
Achievement
SN Contents Page
1 Energy Power Supply Position (Provisional) for Apr-2019 and during Apr-19 to Apr-19 23
2 Peak Power Supply Position (Provisional) for Apr-2019 and during Apr-19 to Apr-19 24
3 Energy Power Supply Position (Revised) for Mar-2019 and during Apr-19 to Mar-19 25
4 Peak Power Supply Position (Revised) for Mar-2019 and during Apr-19 to Mar-19 26
5 Notified Power cuts Restrictions on Industries during Apr-2019 27
6 Power Supply to Agricultural Sector during Apr-2019 28
Section F - Power supply position
आकड़ मममलयन यननट नट Figures in MU net
ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied
कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )
चडीगढ़ Chandigarh 117 117 0 00 117 117 0 00
दिलली Delhi 2698 2698 1 00 2698 2698 1 00
हरियजणज Haryana 3773 3773 0 00 3773 3773 0 00
दहमजचल परिश Himachal Pradesh 777 777 0 00 777 777 0 00
रमम कशमीि Jammu amp Kashmir 1604 1296 308 192 1604 1296 308 192
परजब Punjab 3646 3646 0 00 3646 3646 0 00
िजरसथजन Rajasthan 6210 6208 2 00 6210 6208 2 00
उतति परिश Uttar Pradesh 10179 10148 32 03 10179 10148 32 03
उततिजखड Uttarakhand 1120 1120 0 00 1120 1120 0 00
उततरी कषतर Northern Region 30094 29786 308 10 30094 29786 308 10
छततीसगढ़ Chhattisgarh 2684 2676 8 03 2684 2676 8 03
गरिजत Gujarat 10718 10718 0 00 10718 10718 0 00
मधय परिश Madhya Pradesh 6006 6006 0 00 6006 6006 0 00
महजिजषटर Maharashtra 14308 14308 0 00 14308 14308 0 00
िमन औि दिउ Daman amp Diu 220 220 0 00 220 220 0 00
िजिि व नगि हवली Dadra amp Nagar Haveli 552 552 0 00 552 552 0 00
गोवज Goa 388 388 0 00 388 388 0 00
पशचिमी कषतर Western Region 34875 34868 8 00 34875 34868 8 00
आनधर परिश Andhra Pradesh 5708 5708 0 00 5708 5708 0 00
तलगजनज Telangana 5725 5725 0 00 5725 5725 0 00
कनजाटक Karnataka 7003 7003 0 00 7003 7003 0 00
किल Kerala 2402 2400 2 01 2402 2400 2 01
तममल नजड Tamil Nadu 10010 10010 0 00 10010 10010 0 00
पडचिी Puducherry 263 263 0 00 263 263 0 00
लकष-दवीप Lakshadweep 4 4 0 0 4 4 0 0
दकषकषणी कषतर Southern Region 31111 31109 2 00 31111 31109 2 00
बबहजि Bihar 2589 2589 0 00 2589 2589 0 00
िजमोिि घजटी ननगम DVC 1772 1772 0 00 1772 1772 0 00
झजिखणड Jharkhand 689 689 0 00 689 689 0 00
ओडडशज Odisha 2689 2689 1 00 2689 2689 1 00
पशशचम बगजल West Bengal 5075 5075 0 00 5075 5075 0 00
मसशककम Sikkim 37 37 0 00 37 37 0 00
अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 7 29 27 2 7
परवी कषतर Eastern Region 12851 12850 1 00 12851 12850 1 00
अरणजचल परिश Arunachal Pradesh 66 66 0 05 66 66 0 05
असम Assam 766 709 57 75 766 709 57 75
मणणपि Manipur 68 67 1 15 68 67 1 15
मघजलय Meghalaya 170 160 10 59 170 160 10 59
ममज़ोिम Mizoram 54 53 0 08 54 53 0 08
नजगजलड Nagaland 54 54 0 08 54 54 0 08
बिपिज Tripura 122 120 1 12 122 120 1 12
उततर-परवी कषतर North-Eastern Region 1300 1228 71 55 1300 1228 71 55
समपणण भारत All India 110231 109842 389 04 110231 109842 389 04
23
ऊरजा पनत ा म कमी ऊरजा पनत ा म कमीEnergy not Supplied
Excludes energy exported to Bangladesh
Energy not Supplied
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
ऊराण वरवदयत आपरत ण शथिरत ररपोरण (परवाणरवलोकन) Energy Power Supply Position Report (Provisional)
राजयState
अपरल 2019 April2019 अपरल2019 -अपरल2019 April2019 to April2019
अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met
कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )
चडीगढ़ Chandigarh 256 256 0 00 256 256 0 00
दिलली Delhi 5664 5664 0 00 5664 5664 0 00
हरियजणज Haryana 8127 8127 0 00 8127 8127 0 00
दहमजचल परिश Himachal Pradesh 1387 1387 0 00 1387 1387 0 00
रमम कशमीि Jammu amp Kashmir 2826 2261 565 200 2826 2261 565 200
परजब Punjab 7015 7015 0 00 7015 7015 0 00
िजरसथजन Rajasthan 10560 10560 0 00 10560 10560 0 00
उतति परिश Uttar Pradesh 19935 19935 0 00 19935 19935 0 00
उततिजखड Uttarakhand 1922 1922 0 00 1922 1922 0 00
उततरी कषतर Northern Region 54476 53985 491 09 54476 53985 491 09
छततीसगढ़ Chhattisgarh 4596 4574 22 05 4596 4574 22 05
गरिजत Gujarat 17871 17865 6 00 17871 17865 6 00
मधय परिश Madhya Pradesh 10018 10018 0 00 10018 10018 0 00
महजिजषटर Maharashtra 23158 23150 8 00 23158 23150 8 00
िमन औि दिउ Daman amp Diu 341 340 1 02 341 340 1 02
िजिि व नगि हवली Dadra amp Nagar Haveli 818 818 0 00 818 818 0 00
गोवज Goa 594 594 0 00 594 594 0 00
पशचिमी कषतर Western Region 56242 56222 20 00 56242 56222 20 00
आनधर परिश Andhra Pradesh 9151 9151 0 00 9151 9151 0 00
तलगजनज Telangana 10191 10191 0 00 10191 10191 0 00
कनजाटक Karnataka 12681 12681 0 00 12681 12681 0 00
किल Kerala 4309 4300 8 02 4309 4300 8 02
तममल नजड Tamil Nadu 15972 15972 0 00 15972 15972 0 00
पडचिी Puducherry 482 480 2 05 482 480 2 05
लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0
दकषकषणी कषतर Southern Region 49155 49103 52 01 49155 49103 52 01
बबहजि Bihar 5357 5357 0 00 5357 5357 0 00
िजमोिि घजटी ननगम DVC 3039 3039 0 00 3039 3039 0 00
झजिखणड Jharkhand 1266 1266 0 00 1266 1266 0 00
ओडडशज Odisha 5389 5389 0 00 5389 5389 0 00
पशशचम बगजल West Bengal 8666 8666 0 00 8666 8666 0 00
मसशककम Sikkim 100 100 0 00 100 100 0 00
अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7
परवी कषतर Eastern Region 23349 23349 0 00 23349 23349 0 00
अरणजचल परिश Arunachal Pradesh 139 136 3 22 139 136 3 22
असम Assam 1712 1667 45 26 1712 1667 45 26
मणणपि Manipur 197 188 9 46 197 188 9 46
मघजलय Meghalaya 336 336 0 00 336 336 0 00
ममज़ोिम Mizoram 116 113 3 26 116 113 3 26
नजगजलड Nagaland 157 131 26 166 157 131 26 166
बिपिज Tripura 292 291 1 03 292 291 1 03
उततर-परवी कषतर North-Eastern Region 2848 2780 68 24 2848 2780 68 24
समपणण भारत All India 177411 176810 601 03 177411 176810 601 03
24
मजग की पनत ा म कमी Demand not Met
Excludes the supply to Bangladesh
राजयStateअपरल 2019 April2019
मजग की पनत ा म कमी Demand not Met
अधिकतम वरवदयत आपरत ण शथिरत ररपोरण (परवाणरवलोकन) Peak Power Supply Position Report (Provisional)
आकड़ मगज वजट नट Figures in MW netअपरल2019 -अपरल2019 April2019 to April2019
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
आकड़ मममलयन यननट नट Figures in MU net
ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied
कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )
चडीगढ़ Chandigarh 96 96 0 00 1561 1561 0 00
दिलली Delhi 1931 1930 1 00 32299 32282 17 01
हरियजणज Haryana 3658 3658 0 00 53665 53665 0 00
दहमजचल परिश Himachal Pradesh 832 830 2 02 9850 9618 232 24
रमम कशमीि Jammu amp Kashmir 1767 1414 353 200 19593 15868 3725 190
परजब Punjab 3585 3585 0 00 55288 55275 13 00
िजरसथजन Rajasthan 6774 6770 4 01 79826 79637 189 02
उतति परिश Uttar Pradesh 8754 8691 63 07 117101 116118 984 08
उततिजखड Uttarakhand 1067 1067 0 00 13845 13753 92 07
उततरी कषतर Northern Region 28464 28041 423 15 383028 377776 5251 14
छततीसगढ़ Chhattisgarh 2464 2457 8 03 26130 26076 54 02
गरिजत Gujarat 9890 9890 0 00 116588 116572 15 00
मधय परिश Madhya Pradesh 6236 6236 0 00 75667 75665 2 00
महजिजषटर Maharashtra 13631 13631 0 00 158285 158148 137 01
िमन औि दिउ Daman amp Diu 221 221 0 00 2557 2557 0 00
िजिि व नगि हवली Dadra amp Nagar Haveli 553 553 0 00 6317 6317 0 00
गोवज Goa 362 362 0 00 4283 4280 3 01
पशचिमी कषतर Western Region 33357 33349 8 00 389827 389615 212 01
आनधर परिश Andhra Pradesh 6072 6071 1 00 63735 63677 58 01
तलगजनज Telangana 6930 6929 1 00 66697 66635 62 01
कनजाटक Karnataka 7614 7612 1 00 71759 71690 69 01
किल Kerala 2489 2488 1 00 25029 24911 118 05
तममल नजड Tamil Nadu 10247 10245 2 00 109375 109273 102 01
पडचिी Puducherry 252 251 1 04 2761 2751 10 03
लकष-दवीप Lakshadweep 4 4 0 0 46 46 0 0
दकषकषणी कषतर Southern Region 33605 33597 8 00 339355 338938 417 01
बबहजि Bihar 2319 2318 1 00 30052 29827 225 07
िजमोिि घजटी ननगम DVC 1773 1772 1 00 22365 21995 369 17
झजिखणड Jharkhand 698 697 1 01 8682 8461 221 25
ओडडशज Odisha 2583 2582 1 00 31810 31781 30 01
पशशचम बगजल West Bengal 4585 4584 2 00 52237 52078 159 03
मसशककम Sikkim 41 41 0 00 513 512 0 01
अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 67 346 323 23 67
परवी कषतर Eastern Region 11999 11995 5 00 145658 144654 1004 07
अरणजचल परिश Arunachal Pradesh 61 60 0 06 864 855 9 10
असम Assam 680 656 23 34 9532 9204 328 34
मणणपि Manipur 68 68 1 09 916 906 10 11
मघजलय Meghalaya 173 173 0 03 1955 1953 1 01
ममज़ोिम Mizoram 50 49 0 09 668 661 8 12
नजगजलड Nagaland 58 57 1 20 902 809 93 103
बिपिज Tripura 150 150 0 00 1859 1837 21 11
उततर-परवी कषतर North-Eastern Region 1240 1214 26 21 16696 16225 471 28
समपणण भारत All India 108665 108196 469 04 1274564 1267209 7355 06
Note The revised data for March 2019 is not avaliable
Excludes energy exported to Bangladesh
राजयState
ऊराण वरवदयत आपरत ण शथिरत ररपोरण (परवाणरवलोकन) Energy Power Supply Position Report (Provisional)
25
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
Energy not Supplied Energy not Supplied
मािण2019 March2019 अपरल2018 -मािण2019 April2018 to March2019
ऊरजा पनत ा म कमी ऊरजा पनत ा म कमी
अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met
कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )
चडीगढ़ Chandigarh 223 223 0 00 369 369 0 00
दिलली Delhi 4016 4016 0 00 7016 7016 0 00
हरियजणज Haryana 6544 6544 0 00 10270 10270 0 00
दहमजचल परिश Himachal Pradesh 1683 1683 0 00 1700 1700 0 00
रमम कशमीि Jammu amp Kashmir 3277 2622 655 200 3277 2622 655 200
परजब Punjab 6564 6564 0 00 12638 12638 0 00
िजरसथजन Rajasthan 11885 11885 0 00 13276 13276 0 00
उतति परिश Uttar Pradesh 16220 16220 0 00 20498 20062 436 21
उततिजखड Uttarakhand 2002 2002 0 00 2216 2216 0 00
उततरी कषतर Northern Region 47925 47356 569 12 63166 61726 1440 23
छततीसगढ़ Chhattisgarh 4444 4128 316 71 4444 4270 174 39
गरिजत Gujarat 16263 16263 0 00 17053 16963 90 05
मधय परिश Madhya Pradesh 12328 12323 5 00 13815 13815 0 00
महजिजषटर Maharashtra 22361 22291 70 03 23864 23254 610 26
िमन औि दिउ Daman amp Diu 336 336 0 01 357 356 1 02
िजिि व नगि हवली Dadra amp Nagar Haveli 800 799 1 01 816 815 1 01
गोवज Goa 538 538 0 00 596 596 0 00
पशचिमी कषतर Western Region 53132 52965 167 03 56675 55821 853 15
आनधर परिश Andhra Pradesh 8977 8977 0 00 9459 9453 6 01
तलगजनज Telangana 10471 10471 0 00 10815 10815 0 00
कनजाटक Karnataka 12841 12841 0 00 12841 12841 0 00
किल Kerala 4264 4228 36 09 4264 4228 36 09
तममल नजड Tamil Nadu 15712 15712 0 00 15712 15712 0 00
पडचिी Puducherry 427 412 15 34 427 412 15 34
लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0
दकषकषणी कषतर Southern Region 49464 49464 0 00 49464 49464 0 00
बबहजि Bihar 4633 4633 0 00 5115 5084 31 06
िजमोिि घजटी ननगम DVC 3035 3035 0 00 3035 3035 0 00
झजिखणड Jharkhand 1210 1210 0 00 1339 1291 48 36
ओडडशज Odisha 4827 4827 0 00 5357 5357 0 00
पशशचम बगजल West Bengal 8287 8287 0 00 9130 9123 7 01
मसशककम Sikkim 100 100 0 00 106 106 0 00
अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7
परवी कषतर Eastern Region 21658 21658 0 00 23141 22733 408 18
अरणजचल परिश Arunachal Pradesh 133 131 2 15 138 138 0 01
असम Assam 1539 1508 31 20 1865 1809 56 30
मणणपि Manipur 204 199 5 25 219 216 3 12
मघजलय Meghalaya 357 357 0 00 374 372 1 04
ममज़ोिम Mizoram 108 105 3 28 121 119 2 17
नजगजलड Nagaland 127 125 2 16 156 138 18 116
बिपिज Tripura 249 249 0 00 298 293 5 17
उततर-परवी कषतर North-Eastern Region 2540 2535 5 02 2967 2850 117 39
समपणण भारत All India 169464 168745 719 04 177022 175528 1494 08
Note The revised data for March 2019 is not avaliable 26
अधिकतम वरवदयत आपरत ण शथिरत ररपोरण (परवाणरवलोकन) Peak Power Supply Position Report (Provisional)
आकड़ मगज वजट नट Figures in MW net
राजयStateमािण2019 March2019 अपरल2018 -मािण2019 April2018 to March2019
मजग की पनत ा म कमी मजग की पनत ा म कमी Demand not MetDemand not Met
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
Excludes the supply to Bangladesh
अपरल 2019 April2019 अपरल2018 -मािण2019 April2019 to April2019
उततरी कषतर Northern Region
चडीगढ़ Chandigarh(Data Not Received)दिलली Delhi
हरियजणज Haryana
दहमजचल परिश Himachal Pradeshरमम कशमीि Jammu amp Kashmir(Data
Not Received)परजब Punjab
िजरसथजन Rajasthanउतति परिश Uttar Pradesh
उततिजखड Uttarakhand
पशचिमी कषतर Western Region
छततीसगढ़ Chhattisgarh
Apr-Nov 2018- No cuts
Maximum Demand cut-58MW
Energy cut- 00020-00032 MUsday
गरिजत Gujarat
मधय परिश Madhya Pradesh
महजिजषटर Maharashtra
गोवज Goa
दकषकषणी कषतर Southern Region
आनधर परिश Andhra Pradesh
तलगजनज Telangana
कनजाटक Karnataka
किल Kerala
तममल नजड Tamil Nadu
पडचिी Puducherryपरवी कषतर Eastern Region
बबहजि Bihar
झजिखणड Jharkhand
ओडडशज Odisha
पशशचम बगजल West Bengal
No N
otifie
d Cu
ts
27
मािण 2019 म इडथरीर पर वरवदयत करौती का वरवरवरण Notified Power CutsRestrictions on Industries during April2019
राजय कषतर State Regionऊराणमाग करौती EnergyDemand Cut
No N
otifie
d Cu
tsNo
Notifie
d Cu
ts
अपरल2019 April 2019 अपरल2019 -अपरल2019 April2019 to April2019
उततरी कषतर Northern Region
चडीगढ़ Chandigarh Data not received Data not received
दिलली Delhi Data not received Data not received
हरियजणज Haryana 0811 hrsday 0811 hrsday
दहमजचल परिश Himachal Pradesh HPSEBL has only 2 agriculture consumers and uninterrupted
power is being supplied to agriculture sector
HPSEBL has only 2 agriculture consumers and uninterrupted
power is being supplied to agriculture sector
रमम कशमीि Jammu amp Kashmir Data not received Data not received
परजब Punjab 379 hrsday 379 hrsday
िजरसथजन Rajasthan 0630 hrsday 0630 hrsday
उतति परिश Uttar Pradesh 2157 hrsday 2157 hrsday
उततिजखड Uttarakhand 2359 hrsday 2359 hrsday
पशचिमी कषतर Western Region
छततीसगढ़ Chhattisgarh 18 hrsday 18 hrsday
गरिजत Gujarat 8 hrsday 8 hrsday
मधय परिश Madhya Pradesh Three-Phase Supply(Irrigation)- 0953 hrs day Three-Phase
(Mixed) Supply - 2334 hrs day
Three-Phase Supply(Irrigation)- 0953 hrs day Three-Phase
(Mixed) Supply - 2334 hrs day
महजिजषटर Maharashtra Three-Phase Supply(Irrigation)- 9 hrs day Three-Phase Supply(Irrigation)- 9 hrs day
गोवज Goa No restriction No restriction
दकषकषणी कषतर Southern Region
आनधर परिश Andhra Pradesh 07 hrsday 07 hrsday
तलगजनज Telangana 24 hrsday 24 hrsday
कनजाटक Karnataka 6 hrsday 6 hrsday
किल Kerala No Restrictions No Restrictions
तममल नजड Tamil Nadu 9 hrsday (6 hrs during day time and 3 hrs during night time) 9 hrsday (6 hrs during day time and 3 hrs during night time)
पडचिी Puducherry No Restrictions No Restrictions
परवी कषतर Eastern Region
बबहजि Bihar 18 hrsday 18 hrsday
झजिखणड Jharkhand 20 hrsday 20 hrsday
ओडडशज Odisha 24 hrsday 24 hrsday
पशशचम बगजल West Bengal 23 hrsday 23 hrsday
28
मारच 2019 कषि कषतर को षिदयत आपरतच का षििरण Power Supply to Agricultural Sector during March2019
राजय कषतर State Regionऔसत वरवदयत आपरत ण घनरो म Average Hours of Supply
On segregated feeders
SNo Contents Page
1 Growth of Installed Capacity since 6th Plan 29
2 Progress of Transmission Sector since 6th Plan 30
3 All India Yearly Coal consumption for Power Generation (Utilities)
4 All India Annual Per Capita Consumption of Electricity since -2006
5 Average cost of power supply amp Average realisation (Paisakwh)
6 Growth of Rural Electrification amp Pump Sets Energisation
7 Status of Hydro Schemes Cleared by the CEA in Apr-2019
Section G - Growth of Power Sector
31
32
(In MW)
Coal Gas Diesel Total
End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472
End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634
End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537
End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596
End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921
End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703
End of 12th Plan 19216288 2532938 83763 21832988 6780 4447842 50018 31960630
Up to Apr-2019 20070450 2493722 63763 22627934 678000 4539922 7764163 35610019
Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-17) = 51529 MW
Electricity Generation (MU) Targets and Achievements for 2016-17
Coal Gas Diesel Nuclear Hydro Res Total
2007045 2493722 637629 678000 453992 77641625 22925174
29
1 Growth of Installed Capacity Since 6th Plan
Plan YearThermal
Nuclear Hydro RES (MNRE) Total
2007045
2493722637629
678000
4539922
77641625
Total Installed Capacity 35610019 MW
Coal Gas Diesel Nuclear Hydro Res
Progress of Transmission Sector in the Country up to April 2019
1 TRANSMISSION LINES (All fig in CKM)
At the end of
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
6th plan 0 0 0 0 0 0 0 0 0 0 0 0 1831 4198 0 6029 1641 44364 0 46005 3472 48562 0 52034
7th plan 0 0 0 0 0 0 0 0 0 0 0 0 13068 6756 0 19824 4560 55071 0 59631 17628 61827 0 79455
8th plan 0 0 0 0 1634 0 0 1634 0 0 0 0 23001 13141 0 36142 6564 73036 0 79600 31199 86177 0 117376
9th plan 0 0 0 0 3234 1504 0 4738 751 409 0 1160 29345 20033 0 49378 8687 88306 0 96993 42017 110252 0 152269
10th plan 0 0 0 0 4368 1504 0 5872 1775 409 0 2184 48708 24730 0 73438 9444 105185 0 114629 64295 131828 0 196123
11th Plan 0 0 0 0 5948 1504 1980 9432 4839 411 0 5250 71023 30191 5605 106819 10140 125010 830 135980 91950 157116 8415 257481
12th Plan 6124 0 0 6124 5948 1504 1980 9432 25465 1177 4598 31240 92482 48240 17065 157787 11014 151276 978 163268 141033 202197 24621 367851
13th Plan (Up
to Mar2019)6124 0 0 6124 5948 1504 1980 9432 33692 1512 6605 41809 101335 58238 21173 180746 11734 162552 1010 175296 158833 223806 30768 413407
13th Plan (Up
to Apr-19)6124 0 0 6124 5948 1504 1980 9432 33745 1512 6605 41862 101335 58258 21173 180766 11734 162953 1010 175697 158886 224227 30768 413881
27150 600 MW of 132 kV Inter-Regional power transmission capacity links which are operated radially from time to time is not added in the total
75050
47900
24000
99050
30
Grand Total
Note - The figure upto the end of 10th plan in for stringing progress including the lines not commissioned Now only commissioned lines are reckoned Accordingly the figure for 10th plan (end) may read
as 187555 after adjusting with (-) 10852 Ckm
Inter-regional Power Transfer Capacity (MW)
plusmn 800 kV HVDC plusmn 500 kV HVDC 765 kV 400 kV 220 kV
IR addition in 12th
Plan (up to March
2017)
Inter-regional
Transmission
Capacity at the end
of Plan Period 2017-
22 (as on April19)
IR at the end of 11th
PlanIR at the end of 12th
Plan
IR Capacity Addition
at the end of Plan
Period 2017-22 (Till
April 19)
2004-05 27800
2005-06 28100
2006-07 30200
2007-08 33000
2008-09 35500
2009-10 36700
2010-11 38700
2011-12 41756
2012-13 45460
2013-14 48940
2014-15 53040
2015-16 54590
2016-17 57430
2017-18 60800
2018-19 62890
Year
2005-06
2006-07
2007-08
2008-09
2009-10
2010-11
2011-12
2012-13
2013-14
2014-15
2015-16
2016-17
2017-18
2018-19
2004-05 254 209 7568
2005-06 260 221 7636
2006-07 276 227 7423
2007-08 293 239 7727
2008-09 340 263 8713
2009-10 355 268 8870
2010-11 398 303 11975
2011-12 455 330 13514
2012-13 501 376 14867
2013-14 518 175
2014-15 520
Source- PFC Reports on the performance of State Power Utilities 31
1181
7335
7786
91441
8188
88363
957
1010
1075
1122
1149
(GrossGen+ Net Import) Mid-year population Provisional
5 Average cost of power supply amp average realization ( paiseKWH )
Yearcost of supply
(paiseunit)
Realization(paiseunit)
Including AgricultureOnly
Agriculture
6719
7171
3 All India yearly Coal Consumption for Power Generation (Utilities)
YEARCoal Consumption
Million Tonnes
4 All India Annual per Capita consumption of Electricity Since 2006
Per Capita Consumption ( kWh)
6314
Sl
NoExecuting Agency
Installed
Capacity (MW)Cost (Rs crore)
Date of
Clearance
32
Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as
Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received
from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made
available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified
villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is
independent of the earlier published reports
No Hydro Electric Project has been issued concurrenceAppraisal letter by CEA during April 2019
7 Status of Hydro Schemes Cleared by the CEA in Apr-2019
Name of Scheme
1999-002000-01
297594
010408 to 310309010409 to 310310
10th Plan
2005-062006-07
322968331020
6 Growth Of Rural Electrification amp Pumpsets Energisation
Plan Year
9th Plan2002-03
134092626
4111
Pump Sets Energised Villages Electricfied (Nos)
2001-02
284064367244
1218
27801997-981998-99
3207
482864
12632
1576036
4451722594
15455554
2314176
397343611750
2093311060316074
65109527813884
46708
18423975
499150
2003-042004-05
5743
9769
Cumu upto End of 10th Plan
010407 to 310308
010410 to 310311557976840909
010411 to 310312
412667
86293726
No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification
since 2004-05
65291374575 296361511th Plan
Cumu upto End of 11th Plan
596556 21212860
557439Cummulative up to end of 12th Plan
SN Contents Page
1 Rate of sale of power for the year 2016-17 33-41
RATE OF SALE OF POWER FOR THE YEAR 2016-17
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) NORTHERN REGION
CENTRAL SECTOR
BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 18000 66900 19800
CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 54000 222400 21600
CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 30000 144400 19600
CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 23100 91700 42600
PARBATI - III HPS NHPC LTD HYDRO-HYDRO 52000 68200 54800
DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 28000 95600 30000
CHUTAK NHPC LTD HYDRO-HYDRO 4400 22000 79800
DULHASTI HPS NHPC LTD HYDRO-HYDRO 39000 228000 56400
SALAL HPS NHPC LTD HYDRO-HYDRO 69000 342300 11000
TANAKPUR HPS NHPC LTD HYDRO-HYDRO 9420 43000 29600
URI HPS -I NHPC LTD HYDRO-HYDRO 48000 280300 16000
URI HPS - II NHPC LTD HYDRO-HYDRO 24000 147300 48600
NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 4500 24600 88200
SEWA - II NHPC LTD HYDRO-HYDRO 12000 47100 43400
ANTA CCPP NTPC LTD THERMAL-GASN 41930 67539 32400
AURAIYA CCPP NTPC LTD THERMAL-GASN 66336 53501 39100
BADARPUR TPS NTPC LTD THERMAL-COAL 70500 159153 44800
DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 84000 296170 42300
DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 98000 526686 46300
DADRI CCPP NTPC LTD THERMAL-GASHSD 82978 227469 33000
FARIDABAD CCPP NTPC LTD THERMAL-GASN 43159 115577 30800
RIHAND STPS I NTPC LTD THERMAL-COAL 100000 596766 24500
RIHAND STPS II NTPC LTD THERMAL-COAL 100000 737069 24600
RIHAND STPS III NTPC LTD THERMAL-COAL 100000 706546 30600
SINGRAULI STPS NTPC LTD THERMAL-COAL 200000 1394068 20400
TANDA TPS NTPC LTD THERMAL-COAL 44000 295438 40800
UNCHAHAR TPS I NTPC LTD THERMAL-COAL 42000 256454 39800
UNCHAHAR TPS II NTPC LTD THERMAL-COAL 42000 273577 38900
UNCHAHAR TPS III NTPC LTD THERMAL-COAL 21000 142780 43000
KOLDAM NTPC LTD HYDRO-HYDRO 80000 363260 43600
NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 303575 25841
RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 108000 668677 35374
NJHPS SJVNL HYDRO-HYDRO 150000 699496 23820
RAMPUR HPS SJVNL HYDRO-HYDRO 41202 195982 32260
TEHRI HPP THDC HYDRO-HYDRO 100000 272543 51800
KOTESHWAR HEP THDC HYDRO-HYDRO 40000 106244 53400
IGSTPS JHAJJAR ARAVALI P CPL THERMAL-COAL 150000 510429 49490
NEYVELI BARSINGSAR NEYVELI LIG CORP LTD THERMAL-LIG 25000 127520 38040
STATE SECTOR
PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 21000 14222 48200
PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 21000 19205 48400
PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 25000 102257 42600
PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 25000 62107 41800
DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 60000 312213 41000
RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 120000 35767442200
WYC HYDEL STATION HPGCL HYDRO-HYDRO 6240 20365 24900
GIRI POWER HOUSE HPSEB HYDRO-HYDRO 6000 13958 7600
ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 1695 5467 11900
BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 12000 18528 6700
GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 2250 7462 22500
BASSI POWER HOUSE HPSEB HYDRO-HYDRO 6600 29649 7500
BINWA POWER HOUSE HPSEB HYDRO-HYDRO 600 2749 19300
ANNEXURE-I
RATE OF SALE OF POWER FOR THE YEAR 2016-2017
Page 33
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) GAJ POWER HOUSE HPSEB HYDRO-HYDRO 1050 2914 26700
BANER POWER HOUSE HPSEB HYDRO-HYDRO 1200 2864 16200
HOLI POWER HOUSE HPSEB HYDRO-HYDRO 300 616 22500
THIROT POWER HOUSE HPSEB HYDRO-HYDRO 450 1126 22500
KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 1200 3064 22500
LARJI POWER HOUSE HPSEB HYDRO-HYDRO 12600 53677 23700
NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 250 750 31000
CHABA POWER HOUSE HPSEB HYDRO-HYDRO 175 465 23300
RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 150 101 13400
SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 200 000 22500
KILLAR HPSEB HYDRO-HYDRO 030 050 22500
BHABA AUGUMENP H HPSEB HYDRO-HYDRO 450 1276 22500
BS CHAMBA HPSEB HYDRO-HYDRO 045 099 19500
GUMMA HPSEB HYDRO-HYDRO 300 423 22500
GAS TURBINE POWER STATION IPGCL THERMAL-GAS 27000 67233 39300
PPS-I PPCL THERMAL-GAS 33000 175905 38300
PPS-III PPCL THERMAL-GAS 137120 196879 36100
LOWER JHELUM JampKPDD HYDRO-HYDRO 10500 60214 5100
UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 2260 10514 6300
UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 10500 44202 8500
GANDHARBAL JampKPDD HYDRO-HYDRO 1500 8925 4700
KARNAH MPH JampKPDD HYDRO-HYDRO 200 1122 31000
CHENANI I JampKPDD HYDRO-HYDRO 2330 10892 6600
CHENANI II JampKPDD HYDRO-HYDRO 200 1188 9300
CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 750 3634 14200
IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 375 2108 18500
IGO MERCHELLONG JampKPDD HYDRO-HYDRO 300 1572 29700
PAHALGAM MHP JampKPDD HYDRO-HYDRO 450 1713 32900
MARPACHOO JampKPDD HYDRO-HYDRO 075 375 29800
HAFTAL JampKPDD HYDRO-HYDRO 100 483 28700
SANJAK JampKPDD HYDRO-HYDRO 126 441 36000
SEWA-III JampKPDD HYDRO-HYDRO 900 3273 20200
BHADERWAH JampKPDD HYDRO-HYDRO 150 935 8900
BAZGO JampKPDD HYDRO-HYDRO 030 108 33300
SUMOOR JampKPDD HYDRO-HYDRO 010 045 35400
HUNDER JampKPDD HYDRO-HYDRO 040 176 26200
STAKNA JampKPDD HYDRO-HYDRO 400 1933 4100
KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 124000 662879 31360
SURATGARH TPS RRVUNL THERMAL-COAL 150000 402328 41730
CHHABRA TPS 1amp 2 RRVUNL THERMAL-COAL 50000 305946 36700
CHHABRA TPS 3 RRVUNL THERMAL-COAL 25000 151536 36700
CHHABRA TPS 4 RRVUNL THERMAL-COAL 25000 155896 36700
RAMGARH GT POWER PROJECT RRVUNL THERMAL-COAL 22050 43177 41800
RAMGARH GAS T P PROJECT 3 RRVUNL THERMAL-GAS 5000 93615 41800
DHOLPUR C C POWER PROJECT RRVUNL THERMAL-R-LNG 33000 9486 46110
MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 14000 20855 34192
MINI MICRO HYDEL (MMH) P S RRVUNL HYDRO-HYDRO 2385 851 37800
KALISINDH TPP 1 RRVUNL THERMAL-COAL 60000 341543 45000
KALISINDH TPP 2 RRVUNL THERMAL-COAL 60000 211588 45000
KHARA HEP UPJVNL HYDRO-HYDRO 7200 26654 7200
MATATILLA HEP UPJVNL HYDRO-HYDRO 3060 12219 6500
OBRA HEP UPJVNL HYDRO-HYDRO 9900 21517 6300
RIHAND UPJVNL HYDRO-HYDRO 30000 57369 5500
ANPARA A TPS UPRVUNL THERMAL-COAL 63000 317536 27000
ANPARA B TPS UPRVUNL THERMAL-COAL 100000 705605 22700
ANPARA D UPRVUNL THERMAL-COAL 100000 300158 39800
HARDUAGANJ TPS UPRVUNL THERMAL-COAL 16500 45817 49200
HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 50000 304389 46600
OBRA A TPS UPRVUNL THERMAL-COAL 28800 13158 34000
OBRA B TPS UPRVUNL THERMAL-COAL 100000 328124 21900
Page 34
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) PANKI TPS UPRVUNL THERMAL-COAL 21000 66488 50300
PARICHHA TPS UPRVUNL THERMAL-COAL 22000 38762 49400
PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 42000 231931 45600
PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 50000 276722 50400
CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 24000 70845 8290
CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 14400 75366 8390
DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 3375 9595 12080
DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 5100 18701 10520
KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4140 17359 12330
KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 12000 33001 9420
KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 3000 11953 8320
TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 9000 33983 12460
MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 30400 124510 16110
RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 19800 17897 10550
MPUR UTTARAKHAND JVNL HYDRO-HYDRO 930 5121 19200
PATHRI UTTARAKHAND JVNL HYDRO-HYDRO 2040 11636 14200
GALOGI UTTARAKHAND JVNL HYDRO-HYDRO 300 648 12500
PRIVATE SECTOR
MGTPP CLP INDIA PVT LTD THERMAL-COAL 132000 268902 41940
SHRINAGAR HEP ALAKNANDA HPCL HYDRO-HYDRO 33000 127414 48800
GAMA INFRAPROP CCPP GAMA INFRAPROP PVT THERMAL-GAS 22500 52686 47000
PPGCL (BARA) JP POWER VENTURES LTD THERMAL-COAL 198000 448200 38500
MALANA HEP MALANA PCL HYDRO-HYDRO 8600 26354 29792
MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 10000 30369 32580
ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 19200 56347 36079
KASHANG HEP H P PCL HYDRO-HYDRO 19500 5034 29200
BASPA-II HEP HBPCL HYDRO-HYDRO 30000 132769 13600
KARCHAM WANGTOO HEP HBPCL HYDRO-HYDRO 100000 434386 36600
RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 108000 582600 43700
RITHALA COMBI CY POWER PLANT TATA POWER DDL THERMAL-GAS 9480 000 11900
RAJPURA TPS NABHA POWER LTD THERMAL-GAS 140000 901484 39000
TALWANDI SABO POWER LTD TALWANDI SABO POWER LTD THERMAL-COAL 198000 636040 49548
ROJA THERMAL POWER STATION ROJA POWER SCL THERMAL-COAL 120000 727200 43400
KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 34400 63400
BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 36000 62600
MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 38200 60800
UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 37900 61500
KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 42300 58800
LALITPUR PGCL BAJAJ ENERGY PVT LTD THERMAL-COAL 198000 359400 47300
PRAYAGRAJ PGCL PRAYAGRAJ PGCL THERMAL-COAL 132000 448200 38595
KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 132000 783182 33438
WESTERN REGION
CENTRAL SECTOR
INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 100000 325333 23892
OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 52000 141663 34001
GANDHAR CCPP NTPC LTD THERMAL-GAS 65739 221924 28700
KAWAS CCPP NTPC LTD THERMAL-GASN 65620 167929 27000
KORBA I amp II NTPC LTD THERMAL-COAL 210000 1499171 20500
KORBA III NTPC LTD THERMAL-COAL 50000 358746 26600
SIPAT STPS I NTPC LTD THERMAL-COAL 198000 1479902 26800
SIPAT STPS II NTPC LTD THERMAL-COAL 100000 766549 26500
VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 126000 693142 25800
VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 100000 608781 23800
VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 100000 673475 27600
VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 100000 655924 32900
VINDHYACHAL STPS V NTPC LTD THERMAL-COAL 50000 328265 31700
MOUDA I NTPC LTD THERMAL-COAL 100000 343130 44500
MOUDA Ii NTPC LTD THERMAL-COAL 66000 40637 39900
RATNAGIRI GAS amp POWER PVT LTD RGPPL THERMAL-GAS 196708 442485 47000
KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 000 24729
TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 32000 201227 10740
Page 35
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 365122 19069
TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 787444 29324
STATE SECTOR
GSEG-HAZIRA15610 MW GUJARAT S ENEGEN LTD THERMAL-GAS 15610 1805 28200
GSEG-HAZIRA35143 MW GUJARAT S ENEGEN LTD THERMAL-GAS 35130 22276 51300
GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 21978 51800
AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 13929 26100
KORBA TPS EAST CSPGCL THERMAL-COAL 44000 198673 33880
DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 365808 27570
KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 316500 30420
HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 532878 19410
CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 515 58300
MTTPS CHAMPA U-I CSPGCL THERMAL-COAL 50000 220376 39000
MTTPS CHAMPA U-II CSPGCL THERMAL-COAL 50000 23709 10000
SHP GANGREL CSPGCL HYDRO-HYDRO 1000 2350 36790
BANGO HEP CSPGCL HYDRO-HYDRO 12000 14662 8900
MHP KORBA WEST CSPGCL HYDRO-HYDRO 170 859 38190
SIKASAR HEP CSPGCL HYDRO-HYDRO 700 418 26870
DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8843 74500
DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 19446 51500
GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 66388 71600
GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127488 41300
KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 96072 43900
KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 29841 56400
SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 184966 58800
UKAI 1-5 GSECL THERMAL-COAL 85000 204891 46900
UKAI TPS 6 GSECL THERMAL-COAL 50000 284448 48200
WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 271999 58300
WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 82808 44100
KADANA HPS GSECL HYDRO-HYDRO 24200 34433 16800
UKAI HPS GSECL HYDRO-HYDRO 30500 40585 6100
TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 123000 11500
BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 8900 10900
BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 7200 27500
JHINNA HPS MPPGCL HYDRO-HYDRO 2000 9700 18500
RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 44300 3400
GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 17300 4600
SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 4100 16900
MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 14600 27000
PENCH HPS MPPGCL HYDRO-HYDRO 16000 23700 8100
RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 3000 16900
AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 134400 35100
SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 283800 38700
SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 344600 34300
SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 111600 61600
SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 211800 58000
SSTPS PH-I MPPGCL THERMAL-COAL 120000 233100 84300
BHUSAWAL TPS MSPGCL THERMAL-COAL 142000 566258 51100
CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1365682 33700
KHAPERKHEDA MSPGCL THERMAL-COAL 134000 706207 39100
KORADI TPS MSPGCL THERMAL-COAL 62000 443206 42000
NASIK TPS MSPGCL THERMAL-COAL 63000 297275 47000
PARLI TPS MSPGCL THERMAL-COAL 113000 175934 71600
PARAS MSPGCL THERMAL-COAL 50000 267931 38700
URAN CCPP MSPGCL THERMAL-GAS 67200 320330 30600
KOYANA MSPGCL HYDRO-HYDRO 195600 328155 13100
SMALL HYDRO POWER PLANTS MSPGCL HYDRO-HYDRO 45400 93062 30500
BHIRA MSPGCL HYDRO-HYDRO 8000 10046 8400
TILLARI MSPGCL HYDRO-HYDRO 8900 10584 3100
SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 233298 20500
SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 87633 20500
PRIVATE SECTOR
Page 36
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 81282 46750
JNSTPP(JAYPEE NIGRIE) JP POWER VENTURES LTD THERMAL-COAL 132000 726695 29310
MB POWER MB POWER THERMAL-COAL 120000 345632 38310
ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 754922 28671
ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 780761 23495
ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 198000 1263784 32090
ADANI POWER MAHARA ADANI POWER LTD THERMAL-COAL 330000 1666191 34124
AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 170065 36827
SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 252035 45129
ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 458551 36000
ESSAR POWER MP LTD ESSAR POWER MP LTD THERMAL-COAL 60000 243040 28600
VEDANTA LTD (P P -I) VEDANTA LTD THERMAL-GAS 3000 15044 24000
VEDANTA LTD (P P -II) VEDANTA LTD THERMAL-GAS 3000 21293 24000
PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 8234600 24000
165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 5850 64390
145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 68717 40349
SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 132655 28776
SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 144686 38567
MUNDRA UMPPCOASTAL GUJARAT POWER
LTD THERMAL-IMP COAL 400000 2530300
23900
LANCO AMARKANTAK TPP PATHADIH
U-ILANCO AMARKAN POWER LTD THERMAL-COAL 30000 195500
29200
LANCO AMARKANTAK TPP PATHADIH
U-IILANCO AMARKAN POWER LTD THERMAL-COAL 30000 206900
27600
BARADARHA TPS D B POWER LTD THERMAL-COAL 120000 677373 29200
JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 405000 28900
JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 453000 40500
DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 339437 40700
TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 293400 44000
TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 137200 37000
TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 174900 44000
BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 92900 14100
BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23700 34300
KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 27600 48300
CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2530300 23900
BHANDARDRA HEP -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 2475 54900
SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 161400 26500
SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 445000 39000
SOTHERN REGION
CENTRAL SECTOR
NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 325699 54820
NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 305532 39880
NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 998805 38510
NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 113016 54070
NEYVELI TAMILNADU POWER LTD JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 625274 42200
VALLUR TPS NTPC TECL THERMAL-COAL 150000 856438 42350
R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 1493 84300
RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1502919 29400
RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 341291 31800
SIMHADRI I NTPC LTD THERMAL-COAL 100000 688382 36800
SIMHADRI II NTPC LTD THERMAL-COAL 100000 663657 43400
KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 593110 31324
MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 291625 21764
KKNPP-1 amp 2 NPCIL NUCLEAR-NUCLEAR 200000 572609 40948
MINICOY LAKSHADEEP THERMAL-DIESEL 340 770 29600
KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1097 29600
AMINI LAKSHADEEP THERMAL-DIESEL 265 509 29600
ANDROTT LAKSHADEEP THERMAL-DIESEL 219 524 29600
KALPENI LAKSHADEEP THERMAL-DIESEL 175 356 29600
AGATTI LAKSHADEEP THERMAL-DIESEL 195 658 29600
KADMAT LAKSHADEEP THERMAL-DIESEL 190 414 29600
KILTAN LAKSHADEEP THERMAL-DIESEL 150 269 29600
CHETLET LAKSHADEEP THERMAL-DIESEL 100 139 29600
BITRA LAKSHADEEP THERMAL-DIESEL 043 024 29600
BANGARAM LAKSHADEEP THERMAL-DIESEL 018 009 29600
Page 37
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) STATE SECTOR
Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 721811 46500
Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 50000 336142 46500
RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 237358 46500
RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 239926 46500
RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 124500 46500
SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 62109 46500
UPPER SILERU APGENCO HYDRO-HYDRO 24000 33000 46500
LOWER SILERU APGENCO HYDRO-HYDRO 46000 81066 46500
DONKARAI APGENCO HYDRO-HYDRO 2500 6007 46500
PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 1262 46500
CHETTIPETA APGENCO HYDRO-HYDRO 100 214 46500
MUCHKUND APGENCO HYDRO-HYDRO 12000 37571 46500
NAGARJUNASAGAR RCPH APGENCO HYDRO-HYDRO 9000 606 46500
TUNGABHADRA HES amp HAMPI(AP
Share)
APGENCO HYDRO-HYDRO 7200 6100 46500
KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 352232 42600
KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 288131 32500
KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 319272 46500
RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 40073 44300
KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 308317 46000
KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 308963 51300
SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 61004 76600
NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 17960 75300
PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 20873 58300
POCHAMPAD-I TSPGENCO HYDRO-HYDRO 2700 5455 29800
POCHAMPAD-II TSPGENCO HYDRO-HYDRO 900 1932 40700
NIZAMSAGAR TSPGENCO HYDRO-HYDRO 1000 1126 53400
RAICHUR TPS 1 to 7 KPCL THERMAL-COAL 147000 890866 43800
RAICHUR TPS 8 KPCL THERMAL-COAL 25000 159523 48200
BELLARI TPS 1 KPCL THERMAL-COAL 50000 318679 51100
BELLARI TPS 2 KPCL THERMAL-COAL 50000 232347 55600
BELLARI TPS 3 KPCL THERMAL-COAL 70000 47565 34400
BHADRA PH KPCL HYDRO-HYDRO 3920 2369 45900
GERUSUPPA PH KPCL HYDRO-HYDRO 24000 26990 22000
GHAT PRABHA HEP KPCL HYDRO-HYDRO 3200 4777 25300
KADRA HPS KPCL HYDRO-HYDRO 15000 16889 26800
NAGJHARI KPCL HYDRO-HYDRO 90000 155159 9800
KODASALLI DPH KPCL HYDRO-HYDRO 12000 14854 19200
MUNIRA+MGH+SPH+SPH KPCL HYDRO-HYDRO 22640 48211 7900
SHARAVATHY HPS KPCL HYDRO-HYDRO 108550 276215 5400
ALMATTI DPH KPCL HYDRO-HYDRO 29000 39611 24600
VARAHI UGPH KPCL HYDRO-HYDRO 46000 71368 15600
IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 17196 15300
IDUKKI HPS KSEB HYDRO-HYDRO 78000 137905 15300
KAKKAD HPS KSEB HYDRO-HYDRO 5000 13063 15300
KALLADA HPS KSEB HYDRO-HYDRO 1500 4436 15300
KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 46544 15300
KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 635 15300
LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 30822 15300
MALANKARA HPS KSEB HYDRO-HYDRO 1050 2474 15300
MATTUPETTY KSEB HYDRO-HYDRO 200 230 15300
MALAMPUZHA KSEB HYDRO-HYDRO 250 063 15300
CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 864 15300
URUMI ST I amp II KSEB HYDRO-HYDRO 615 903 15300
LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 248 15300
NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7765 19625 15300
PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 16601 15300
PANNIAR HPS KSEB HYDRO-HYDRO 3240 6217 15300
PORINGALKUTHU KSEB HYDRO-HYDRO 3600 10052 15300
PORINGALKUTHU LBE KSEB HYDRO-HYDRO 1600 9438 15300
PEPPARA KSEB HYDRO-HYDRO 300 395 15300
POOZHITHODE KSEB HYDRO-HYDRO 480 1045 15300
Page 38
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) PEECHI KSEB HYDRO-HYDRO 125 040 15300
RANI-PERUNADU KSEB HYDRO-HYDRO 400 585 15300
SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 79783 15300
SENGULAM HPS KSEB HYDRO-HYDRO 5120 11558 15300
SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 16711 15300
VILANGAD KSEB HYDRO-HYDRO 750 1578 15300
BARAPOLE KSEB HYDRO-HYDRO 1500 1932 15300
VELLATHOOVAL KSEB HYDRO-HYDRO 360 305 15300
CHIM0NY KSEB HYDRO-HYDRO 250 156 15300
ADYANPARA KSEB HYDRO-HYDRO 350 501 15300
BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 554 15300
KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 3801 15300
KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 23132 32800
ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 14416 62280
METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 523970 62280
METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 321270 62280
NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 336575 62280
NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 591240 62280
TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 508966 62280
KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 30897 62280
VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 18720 90699 62280
KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 33593 62280
BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 1047 62280
PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 1250 62280
PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 330 62280
MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 4897 62280
MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 032 62280
KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15681 62280
KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 40608 62280
KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 21342 62280
KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 4717 62280
KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4322 62280
KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2399 62280
METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 4416 62280
METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 8035 62280
BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2187 62280
BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2359 62280
BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2511 62280
BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 1949 62280
BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 1819 62280
POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 172 62280
SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 241 62280
MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 026 62280
THIRUMOORTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 136 62280
PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 9309 62280
VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 353 62280
SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 4192 62280
PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 6571 62280
SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 1186 62280
SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6319 62280
ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 6122 62280
KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 28674 62280
SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 18381 62280
SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 4258 62280
KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 12680 62280
KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4201 62280
ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 000 62280
PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 19175 62280
AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 078 62280
BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 504 62280
BHAVANI KATTALAI (BKB)(IIIampIII BB I amp II)TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 5847 62280
PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 000 62280
Page 39
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) SRI DAMODARAM STPS APPDCL THERMAL-COAL 160000 808108 36300
PRIVATE SECTOR
KARUPPUR TANJORE LANCO TANJORE PCL THERMAL-GAS 12000 48096 28770
SIMHAPURI ENERGY LTD SIMHAPURI ENERGY LTD THERMAL-COAL 60000 143900 39100
JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 7111 45500
SBU 1 JSW ENERGY LTD
VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 26000 159100
43300
SBU 2 JSW ENERGY LTD
VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 60000 247900
42800
LANCO KPLLANCO KONDAPALLI POWER
LTDTHERMAL-GAS 36814 85060
25776
LANCO KPL STG -IILANCO KONDAPALLI POWER
LTDTHERMAL-GAS 36600 12979
46330
LANCO KPL STG -IIIALANCO KONDAPALLI POWER
LTDTHERMAL-GAS 37100 85710
46330
LANCO KPL STG -III BLANCO KONDAPALLI POWER
LTDTHERMAL-GAS 37100 43639
46330
HINDUJA NATIONAL PCL HINDUJA NATIONAL PCL THERMAL-COAL 104000 303000 38200
MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 121164 49940
UDUPI POWER COR LTD ADANI POWER LTD THERMAL-COAL 120000 754613 42500
SPECTRUM POWER GENERATION
LTD SPECTRUM PG LTD THERMAL-GASN 20525 9256812
34952
TAQA NEYVELI POWER COM PVT
LTD TAQA NEYVELI THERMAL-LIG 25000 5840
34500
ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 251000 51000
ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 207860 36800
GMR VEMAGIRI POWER GENERATION
LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 30117
46450
EASTERN REGION
CENTRAL SECTOR
MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 64675 53113
MTPS STAGE - II KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 39000 1432 69138
BOKARO `B` TPS DVC THERMAL-COAL 63000 145670 31539
MEJIA TPS U 1-3 DVC THERMAL-COAL 63000 348298 31552
MEJIA TPS U 4 DVC THERMAL-COAL 21000 116099 34997
MEJIA TPS U 5-6 DVC THERMAL-COAL 50000 276427 35976
MEJIA TPS U 7-8 DVC THERMAL-COAL 100000 552854 36991
DURGAPUR STEEL TPS DVC THERMAL-COAL 100000 665550 39323
DURGAPUR TPS DVC THERMAL-COAL 21000 59270 35416
RAGHUNATHPUR TPS DVC THERMAL-COAL 120000 201650 35326
MAITHON HYDEL STA DVC HYDRO-HYDRO 6320 12200 17984
CHANDRAPURA TPSU1-3 DVC THERMAL-COAL 42000 257610 35095
CHANDRAPURA TPSU7-8 DVC THERMAL-COAL 50000 306673 34987
KODERMA TPS DVC THERMAL-COAL 100000 380180 38131
PANCHET HPS DVC HYDRO-HYDRO 8000 13360 17984
TILLAYA HPS DVC HYDRO-HYDRO 400 1410 17984
RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34700 35400
TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 277300 23200
TLDP -III NHPC LTD HYDRO-HYDRO 13200 55400 62000
TLDP -IV NHPC LTD HYDRO-HYDRO 16000 60300 25600
FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 957219 33700
FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 308943 41000
BONGAINGAON TPS NTPC LTD THERMAL-COAL 25000 153663 58600
KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 542277 34200
KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 942591 34200
BARH-II NTPC LTD THERMAL-COAL 132000 728021 44500
TALCHER TPS NTPC LTD THERMAL-COAL 46000 335521 30100
TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 702319 25600
TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1436521 24700
STATE SECTOR
BTPS(RampM) BIHAR STATE PGCL THERMAL-COAL 22000 12142 39700
BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 98331 10602
HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 50593 9482
CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 19689 2605
RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 53192 6033
UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 147208 14637
Page 40
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 60353 4519
IB TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 288567 25000
J P H GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 210 038 61100
MEYONG CHU GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 400 1086 61100
TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 122667 38200
DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 214339 43321
KOLAGHAT THERMAL POWER
STATION
WEST BENGAL PDCL THERMAL-COAL 126000 538269 31603
BAKRESHWAR THERMAL POWER
PLANT
WEST BENGAL PDCL THERMAL-COAL 105000 634876 32154
BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 45000 166855 33299
SANTHALDIH THERMAL POWER
STATION
WEST BENGAL PDCL THERMAL-COAL 50000 336442 34932
SAGARDIGHI THERMAL POWER
PROJECT
WEST BENGAL PDCL THERMAL-COAL 160000 423121 34705
JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 20344 68900
RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 24559 68900
TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 4623 68900
PURULIA PUMPED STORAGE
PROJECT
WEST BENGAL SEDCL HYDRO-HYDRO 90000 108816 68900
MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2768 68900
PRIVATE SECTOR
CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 49474 20230
CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 555500 70200
HALDIA ENERGY HALDIA ENERGY LTD THERMAL-COAL 60000 371000 50400
DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3688 63400
KAMALANGA TPS GMR KAMALANGA ENERGY LTD THERMAL-COAL 105000547670
33300
ADHUNIK POWER U-1 ADHUNIK POWER THERMAL-COAL 27000 158 44060
ADHUNIK POWER U-2 ADHUNIK POWER THERMAL-COAL 27000 168 44250
VL-JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 332800 23622
JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 43000 45250
JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 71700 37030
JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 70700 35920
JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 71100 38870
JOJOBERA UNIT 5 TATA POWER COM LTD THERMAL-COAL 12000 79300 44560
JOJOBERA UNIT 6 TATA POWER COM LTD THERMAL-WHR 12000 83700 12840
IEL KALINGANAGAR U-I TATA POWER COM LTD THERMAL-WG 6750 33400 22500
IEL KALINGANAGAR U-II TATA POWER COM LTD THERMAL-WG 6750 34800 22500
MAITHON UNIT 1 amp 2 TATA POWER COM LTD THERMAL-COAL 105000 678000 36100
HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 27500 24340
HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 28400 24340
HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 15800 24310
NORTH EASTERN REGION
CENTRAL SECTOR
LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 74100 36600
AGARTALA GT NEEPCO THERMAL-GAS 13500 88611 27210
ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 153111 32310
DOYANG HEP NEEPCO HYDRO-HYDRO 7500 25598 49801
KOPILI HEP NEEPCO HYDRO-HYDRO 20000 98186 11491
KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 19582 20237
KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 10310 17968
RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 124093 22945
TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 10100 17344 39000
STATE SECTOR
HYDRO POWER (122 Stns) ITANAGAR GOVT OF ARUNACHAL
PRADESHHYDRO-HYDRO 6971 6217270
24600
KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39514 17337
LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 82327 36810
NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 33318 48290
MYNTRIANG SHEP ST II ASSAM POWER GENCO HYDRO-HYDRO 300 567 35776
LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 9130 49200
LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 012 49200
DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 022 49200
TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 000 49200
UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 4990 16000
UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 6476 37000
UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 16494 14600
UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 3600 9556 15000
SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 758 8000
MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44070 44800
KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 154 41400
TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 091 41400
MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 411 41400
MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 394 41400
KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 760 41400
SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 3264 41400
LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 044 41400
BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 18953 28000
ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 43585 28200
GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 4080 11100
Note
LIG Lignite N Naptha WHR Waste Heat Recovery
Page 41
1 Executive summary of Target and Achievement of Transmission Lines during 2019-20 As on 30-04-19
(All figures in circuit kms)
Ce
ntr
al S
ecto
r
Sta
te S
ecto
r
JV
Pri
va
te S
ecto
r
To
tal
Ce
ntr
al S
ecto
r
Sta
te S
ecto
r
JV
Pri
va
te S
ecto
r
To
tal
Ce
ntr
al S
ecto
r
Sta
te S
ecto
r
JV
Pri
va
te S
ecto
r
To
tal
Ce
ntr
al S
ecto
r
Sta
te S
ecto
r
JV
Pri
va
te S
ecto
r
To
tal
Ce
ntr
al S
ecto
r
Sta
te S
ecto
r
JV
Pri
va
te S
ecto
r
To
tal
Ce
ntr
al
Se
cto
r
Sta
te S
ec
tor
JV
Pri
va
te S
ec
tor
Gra
nd
To
tal
0 0 0 0 0 0 0 0 2727 958 2334 6019 2239 3416 1143 6798 781 10023 0 10804 5747 14397 3477 23621
Apr19 Programme 0 0 0 0 0 0 0 0 577 416 557 1550 60 890 203 1153 0 309 0 309 637 1615 760 3012
Achievement 0 0 0 0 0 0 0 0 53 0 0 53 0 20 0 20 0 401 0 401 53 421 0 474
Upto Apr-19 Programme 0 0 0 0 0 0 0 0 577 416 557 1550 60 890 203 1153 0 309 0 309 637 1615 760 3012
Achievement 0 0 0 0 0 0 0 0 53 0 0 53 0 20 0 20 0 401 0 401 53 421 0 474
20(1)
220 kV Grand Total 800 kV 500 kV
Programme 2019-20
Programme
Achievement
HVDC765 kV 400 kV
Line
1 2 3 4 5 6
1 400 Bhadla (PG) - Bhadla (RVPN) line DC PGCIL 53
53
2 400 LILO of one ckt Jhanor - Navsari at Vav Ss DC GETCO 20
3 220 Banda-Chitrakoot Line DC UPPTCL 226
4 220 Gorakhpur (PG)-Gola line DC UPPTCL 82
5 220 Hapur(765) - Faridnagar line SC UPPTCL 11
6 220 Kalikiri - Madanapalli line DC APTRANSCO 60
7 220LILO of Gr Noida -Noida Sec-129 at Noida
Sec-148DC UPPTCL 1
8 220LILO of one Ckt of Badshahpur Pali at Sec-
65 GurgaonDC HVPNL 3
9 220 Sultanpur-Sangipur LILO Section at Amethi DC UPPTCL 18
421
0
474
20(2)
Grand Total
2Transmission Lines (220 kV and above) CommissionedReady for commissioning During Apr-2019
Voltage
Level (kV)Name of Transmission Lines
Circuit
Type
Executing
Agency
CENTRAL SECTOR
Total of CENTRAL SECTOR
STATE SECTOR Sector
Total of STATE SECTOR
PRIVATE SECTOR
Total of PRIVATE SECTOR
SlNo
Length(CKm)
As on 30-04-19
SN Contents Page
1 Executive summary of Target and Achievement of Substations during 2019-20 21(1)
2Sub Stations (220 kV and above) commissionedready for commisssioning during Apr-
201921(2)
Section D - Sub Stations
1 Executive summary of Target and Achievement of Substations during 2019-2020 As on 30-04-19
(All figures in circuit MVA)
Ce
ntr
al S
ecto
r
Sta
te S
ecto
r
JV
Pri
va
te S
ecto
r
To
tal
Ce
ntr
al S
ecto
r
Sta
te S
ecto
r
JV
Pri
va
te S
ecto
r
To
tal
Ce
ntr
al S
ecto
r
Sta
te S
ecto
r
JV
Pri
va
te S
ecto
r
To
tal
Ce
ntr
al S
ecto
r
Sta
te S
ecto
r
JV
Pri
va
te S
ecto
r
To
tal
Ce
ntr
al S
ecto
r
Sta
te S
ecto
r
JV
Pri
va
te S
ecto
r
To
tal
Ce
ntr
al S
ec
tor
Sta
te S
ec
tor
JV
Pri
va
te S
ec
tor
Gra
nd
To
tal
3000 0 0 3000 0 0 0 0 18000 3000 6000 27000 5205 19665 4260 29130 800 21786 0 22586 27005 44451 10260 81716
Apr19 Programme 0 0 0 0 0 0 0 0 3000 0 3000 6000 0 1000 2000 3000 0 800 0 800 3000 1800 5000 9800
Achievement 0 0 0 0 0 0 0 0 500 0 0 500 815 1980 0 2795 0 1305 0 1305 1315 3285 0 4600
Upto Apr-19 Programme 0 0 0 0 0 0 0 0 3000 0 3000 6000 0 1000 2000 3000 0 800 0 800 3000 1800 5000 9800
Achievement 0 0 0 0 0 0 0 0 500 0 0 500 815 1980 0 2795 0 1305 0 1305 1315 3285 0 4600
21(1)
220 kV Grand Total 800 kV 500 kV
Programme 2019-20
Programme
Achievement
HVDC765 kV 400 kV
As on 30-04-19
Sl Voltage Ratio Capacity
No (kVkV) (MWMVA)
1 2 3 4 5
1 Bhadla SS (3x1500 3x500 MVA) 765400 PGCIL 500
2 Extn at Tumkur (Pavagada ) PS (2x500 MVA) 400220 PGCIL 500
3 Bongaigaon (2nd ICT) Ss 400220 PGCIL 315
Total of CENTRAL SECTOR 1315
4 Motiram Adda Gorakhpur (Aug) (Additional TF) 400220 UPPTCL 240
5 Muradnagar-II Ghaziabad (Aug) (Additional TF) 400220 UPPTCL 240
6 Noida Sec- 148 GBNagar (New) 400220 UPPTCL 5007 Sarnath Varanasi (Aug) TF- II (500-315) 400220 UPPTCL 1858 Sarojininagar Lucknow Aug) TF- II (500-315) 400220 UPPTCL 185
9 Unnao (Aug) TF-III 400220 UPPTCL 31510 Nawada SS 400220 HVPNL 31511 Kharepatan SS 22033 MSETCL 2512 Prathipadu SS 220132 APTRANSCO 10013 Pali Ss 22066 HVPNL 160
14 A-5 Faridabad Ss 22066 HVPNL 60
15 Rentachintala Ss Aug(3X100-2x100) 220132 APTRANSCO 10016 Amethi Ss 220132 UPPTCL 160
17 Gajokhar Varanasi (Aug) TF- II (160-100) 220132 UPPTCL 60
18 Gola Gorakhpur (New) 220132 UPPTCL 160
19 Khurja Bulandshahr (Aug) TF- II (200-160) 220132 UPPTCL 40
20 RC Green GB Nagar (Aug) TF-II (160-100) 220132 UPPTCL 60
21 Sikandrabad Bulandshahr (Aug) (Additional TF) 220132 UPPTCL 160
22 Sitapur (Aug) (Additional TF) 220132 UPPTCL 160
23 Sohawal Ayodhya (Aug) TF-II (160-100) 220132 UPPTCL 60
TOTAL STATE SECTOR 3285
GRAND TOTAL 4600
21(2)
CENTRAL SECTOR
STATE SECTOR
2Sub-Stations (220 kV and above) CommissionedReady for commissioning During Apr-2019
Name of Sub Stations Executing Agency
SN Contents Page
1 Electricity Generation (MU) Targets and Achievements for 2019-20 22
Section E - Electricity Generation
Programme Achievement Ach Programme Achievement Ach
Central Sector 37545100 3177900 3129530 9848 3177900 3129530 9848
State Sector 37498600 3322500 2950558 8881 3322500 2950558 8881
PvtIPP Sector 37346200 3236400 3195940 9875 3236400 3195940 9875
PvtUTL Sector 1823100 159300 165579 10394 159300 165579 10394
Total 114213000 9896100 9441607 9541 9896100 9441607 9541
Central Sector 5661700 386100 481390 12468 386100 481390 12468
State Sector 6680500 498200 536514 10769 498200 536514 10769
PvtIPP Sector 1206900 57300 80405 14032 57300 80405 14032
PvtUTL Sector 144100 12300 10930 8886 12300 10930 8886
Total 13693200 953900 1109239 11628 953900 1109239 11628
Central Sector 4472000 367300 317765 8651 367300 317765 8651
Total 4472000 367300 317765 8651 367300 317765 8651
Bhutan Import 621800 17500 24396 13941 17500 24396 13941
Central Sector 47678800 3931300 3928685 9993 3931300 3928685 9993
State Sector 44179100 3820700 3487072 9127 3820700 3487072 9127
Pvt Sector 40520300 3465300 3452854 9964 3465300 3452854 9964
Total 133000000 11234800 10893007 9696 11234800 10893007 9696
Provisional based on actual-cum-Assesment
Figs in MU
Cummulative
Achievement
Cummulative
Achievement
Mar-19 Mar-18 Upto Mar-2019 Upto Mar-2018
984785 869291 12675910 10183949
22
1 Electricity Generation (MU) Targets and Achievememts for 2019-20
All India Energy Generation During Apr-19 to Apr-19 (MU)
Target (2019-20)Apr-19 to Apr-19
Sector
Hydro
Thermal
Nuclear
Renewable Energy Generation
Achievement
Apr-2019
98961
95393673
112348
94416
11092
3178
108930
0
20000
40000
60000
80000
100000
120000
Thermal Hydro Nuclear Total
Programme
Achievement
SN Contents Page
1 Energy Power Supply Position (Provisional) for Apr-2019 and during Apr-19 to Apr-19 23
2 Peak Power Supply Position (Provisional) for Apr-2019 and during Apr-19 to Apr-19 24
3 Energy Power Supply Position (Revised) for Mar-2019 and during Apr-19 to Mar-19 25
4 Peak Power Supply Position (Revised) for Mar-2019 and during Apr-19 to Mar-19 26
5 Notified Power cuts Restrictions on Industries during Apr-2019 27
6 Power Supply to Agricultural Sector during Apr-2019 28
Section F - Power supply position
आकड़ मममलयन यननट नट Figures in MU net
ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied
कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )
चडीगढ़ Chandigarh 117 117 0 00 117 117 0 00
दिलली Delhi 2698 2698 1 00 2698 2698 1 00
हरियजणज Haryana 3773 3773 0 00 3773 3773 0 00
दहमजचल परिश Himachal Pradesh 777 777 0 00 777 777 0 00
रमम कशमीि Jammu amp Kashmir 1604 1296 308 192 1604 1296 308 192
परजब Punjab 3646 3646 0 00 3646 3646 0 00
िजरसथजन Rajasthan 6210 6208 2 00 6210 6208 2 00
उतति परिश Uttar Pradesh 10179 10148 32 03 10179 10148 32 03
उततिजखड Uttarakhand 1120 1120 0 00 1120 1120 0 00
उततरी कषतर Northern Region 30094 29786 308 10 30094 29786 308 10
छततीसगढ़ Chhattisgarh 2684 2676 8 03 2684 2676 8 03
गरिजत Gujarat 10718 10718 0 00 10718 10718 0 00
मधय परिश Madhya Pradesh 6006 6006 0 00 6006 6006 0 00
महजिजषटर Maharashtra 14308 14308 0 00 14308 14308 0 00
िमन औि दिउ Daman amp Diu 220 220 0 00 220 220 0 00
िजिि व नगि हवली Dadra amp Nagar Haveli 552 552 0 00 552 552 0 00
गोवज Goa 388 388 0 00 388 388 0 00
पशचिमी कषतर Western Region 34875 34868 8 00 34875 34868 8 00
आनधर परिश Andhra Pradesh 5708 5708 0 00 5708 5708 0 00
तलगजनज Telangana 5725 5725 0 00 5725 5725 0 00
कनजाटक Karnataka 7003 7003 0 00 7003 7003 0 00
किल Kerala 2402 2400 2 01 2402 2400 2 01
तममल नजड Tamil Nadu 10010 10010 0 00 10010 10010 0 00
पडचिी Puducherry 263 263 0 00 263 263 0 00
लकष-दवीप Lakshadweep 4 4 0 0 4 4 0 0
दकषकषणी कषतर Southern Region 31111 31109 2 00 31111 31109 2 00
बबहजि Bihar 2589 2589 0 00 2589 2589 0 00
िजमोिि घजटी ननगम DVC 1772 1772 0 00 1772 1772 0 00
झजिखणड Jharkhand 689 689 0 00 689 689 0 00
ओडडशज Odisha 2689 2689 1 00 2689 2689 1 00
पशशचम बगजल West Bengal 5075 5075 0 00 5075 5075 0 00
मसशककम Sikkim 37 37 0 00 37 37 0 00
अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 7 29 27 2 7
परवी कषतर Eastern Region 12851 12850 1 00 12851 12850 1 00
अरणजचल परिश Arunachal Pradesh 66 66 0 05 66 66 0 05
असम Assam 766 709 57 75 766 709 57 75
मणणपि Manipur 68 67 1 15 68 67 1 15
मघजलय Meghalaya 170 160 10 59 170 160 10 59
ममज़ोिम Mizoram 54 53 0 08 54 53 0 08
नजगजलड Nagaland 54 54 0 08 54 54 0 08
बिपिज Tripura 122 120 1 12 122 120 1 12
उततर-परवी कषतर North-Eastern Region 1300 1228 71 55 1300 1228 71 55
समपणण भारत All India 110231 109842 389 04 110231 109842 389 04
23
ऊरजा पनत ा म कमी ऊरजा पनत ा म कमीEnergy not Supplied
Excludes energy exported to Bangladesh
Energy not Supplied
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
ऊराण वरवदयत आपरत ण शथिरत ररपोरण (परवाणरवलोकन) Energy Power Supply Position Report (Provisional)
राजयState
अपरल 2019 April2019 अपरल2019 -अपरल2019 April2019 to April2019
अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met
कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )
चडीगढ़ Chandigarh 256 256 0 00 256 256 0 00
दिलली Delhi 5664 5664 0 00 5664 5664 0 00
हरियजणज Haryana 8127 8127 0 00 8127 8127 0 00
दहमजचल परिश Himachal Pradesh 1387 1387 0 00 1387 1387 0 00
रमम कशमीि Jammu amp Kashmir 2826 2261 565 200 2826 2261 565 200
परजब Punjab 7015 7015 0 00 7015 7015 0 00
िजरसथजन Rajasthan 10560 10560 0 00 10560 10560 0 00
उतति परिश Uttar Pradesh 19935 19935 0 00 19935 19935 0 00
उततिजखड Uttarakhand 1922 1922 0 00 1922 1922 0 00
उततरी कषतर Northern Region 54476 53985 491 09 54476 53985 491 09
छततीसगढ़ Chhattisgarh 4596 4574 22 05 4596 4574 22 05
गरिजत Gujarat 17871 17865 6 00 17871 17865 6 00
मधय परिश Madhya Pradesh 10018 10018 0 00 10018 10018 0 00
महजिजषटर Maharashtra 23158 23150 8 00 23158 23150 8 00
िमन औि दिउ Daman amp Diu 341 340 1 02 341 340 1 02
िजिि व नगि हवली Dadra amp Nagar Haveli 818 818 0 00 818 818 0 00
गोवज Goa 594 594 0 00 594 594 0 00
पशचिमी कषतर Western Region 56242 56222 20 00 56242 56222 20 00
आनधर परिश Andhra Pradesh 9151 9151 0 00 9151 9151 0 00
तलगजनज Telangana 10191 10191 0 00 10191 10191 0 00
कनजाटक Karnataka 12681 12681 0 00 12681 12681 0 00
किल Kerala 4309 4300 8 02 4309 4300 8 02
तममल नजड Tamil Nadu 15972 15972 0 00 15972 15972 0 00
पडचिी Puducherry 482 480 2 05 482 480 2 05
लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0
दकषकषणी कषतर Southern Region 49155 49103 52 01 49155 49103 52 01
बबहजि Bihar 5357 5357 0 00 5357 5357 0 00
िजमोिि घजटी ननगम DVC 3039 3039 0 00 3039 3039 0 00
झजिखणड Jharkhand 1266 1266 0 00 1266 1266 0 00
ओडडशज Odisha 5389 5389 0 00 5389 5389 0 00
पशशचम बगजल West Bengal 8666 8666 0 00 8666 8666 0 00
मसशककम Sikkim 100 100 0 00 100 100 0 00
अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7
परवी कषतर Eastern Region 23349 23349 0 00 23349 23349 0 00
अरणजचल परिश Arunachal Pradesh 139 136 3 22 139 136 3 22
असम Assam 1712 1667 45 26 1712 1667 45 26
मणणपि Manipur 197 188 9 46 197 188 9 46
मघजलय Meghalaya 336 336 0 00 336 336 0 00
ममज़ोिम Mizoram 116 113 3 26 116 113 3 26
नजगजलड Nagaland 157 131 26 166 157 131 26 166
बिपिज Tripura 292 291 1 03 292 291 1 03
उततर-परवी कषतर North-Eastern Region 2848 2780 68 24 2848 2780 68 24
समपणण भारत All India 177411 176810 601 03 177411 176810 601 03
24
मजग की पनत ा म कमी Demand not Met
Excludes the supply to Bangladesh
राजयStateअपरल 2019 April2019
मजग की पनत ा म कमी Demand not Met
अधिकतम वरवदयत आपरत ण शथिरत ररपोरण (परवाणरवलोकन) Peak Power Supply Position Report (Provisional)
आकड़ मगज वजट नट Figures in MW netअपरल2019 -अपरल2019 April2019 to April2019
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
आकड़ मममलयन यननट नट Figures in MU net
ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied
कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )
चडीगढ़ Chandigarh 96 96 0 00 1561 1561 0 00
दिलली Delhi 1931 1930 1 00 32299 32282 17 01
हरियजणज Haryana 3658 3658 0 00 53665 53665 0 00
दहमजचल परिश Himachal Pradesh 832 830 2 02 9850 9618 232 24
रमम कशमीि Jammu amp Kashmir 1767 1414 353 200 19593 15868 3725 190
परजब Punjab 3585 3585 0 00 55288 55275 13 00
िजरसथजन Rajasthan 6774 6770 4 01 79826 79637 189 02
उतति परिश Uttar Pradesh 8754 8691 63 07 117101 116118 984 08
उततिजखड Uttarakhand 1067 1067 0 00 13845 13753 92 07
उततरी कषतर Northern Region 28464 28041 423 15 383028 377776 5251 14
छततीसगढ़ Chhattisgarh 2464 2457 8 03 26130 26076 54 02
गरिजत Gujarat 9890 9890 0 00 116588 116572 15 00
मधय परिश Madhya Pradesh 6236 6236 0 00 75667 75665 2 00
महजिजषटर Maharashtra 13631 13631 0 00 158285 158148 137 01
िमन औि दिउ Daman amp Diu 221 221 0 00 2557 2557 0 00
िजिि व नगि हवली Dadra amp Nagar Haveli 553 553 0 00 6317 6317 0 00
गोवज Goa 362 362 0 00 4283 4280 3 01
पशचिमी कषतर Western Region 33357 33349 8 00 389827 389615 212 01
आनधर परिश Andhra Pradesh 6072 6071 1 00 63735 63677 58 01
तलगजनज Telangana 6930 6929 1 00 66697 66635 62 01
कनजाटक Karnataka 7614 7612 1 00 71759 71690 69 01
किल Kerala 2489 2488 1 00 25029 24911 118 05
तममल नजड Tamil Nadu 10247 10245 2 00 109375 109273 102 01
पडचिी Puducherry 252 251 1 04 2761 2751 10 03
लकष-दवीप Lakshadweep 4 4 0 0 46 46 0 0
दकषकषणी कषतर Southern Region 33605 33597 8 00 339355 338938 417 01
बबहजि Bihar 2319 2318 1 00 30052 29827 225 07
िजमोिि घजटी ननगम DVC 1773 1772 1 00 22365 21995 369 17
झजिखणड Jharkhand 698 697 1 01 8682 8461 221 25
ओडडशज Odisha 2583 2582 1 00 31810 31781 30 01
पशशचम बगजल West Bengal 4585 4584 2 00 52237 52078 159 03
मसशककम Sikkim 41 41 0 00 513 512 0 01
अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 67 346 323 23 67
परवी कषतर Eastern Region 11999 11995 5 00 145658 144654 1004 07
अरणजचल परिश Arunachal Pradesh 61 60 0 06 864 855 9 10
असम Assam 680 656 23 34 9532 9204 328 34
मणणपि Manipur 68 68 1 09 916 906 10 11
मघजलय Meghalaya 173 173 0 03 1955 1953 1 01
ममज़ोिम Mizoram 50 49 0 09 668 661 8 12
नजगजलड Nagaland 58 57 1 20 902 809 93 103
बिपिज Tripura 150 150 0 00 1859 1837 21 11
उततर-परवी कषतर North-Eastern Region 1240 1214 26 21 16696 16225 471 28
समपणण भारत All India 108665 108196 469 04 1274564 1267209 7355 06
Note The revised data for March 2019 is not avaliable
Excludes energy exported to Bangladesh
राजयState
ऊराण वरवदयत आपरत ण शथिरत ररपोरण (परवाणरवलोकन) Energy Power Supply Position Report (Provisional)
25
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
Energy not Supplied Energy not Supplied
मािण2019 March2019 अपरल2018 -मािण2019 April2018 to March2019
ऊरजा पनत ा म कमी ऊरजा पनत ा म कमी
अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met
कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )
चडीगढ़ Chandigarh 223 223 0 00 369 369 0 00
दिलली Delhi 4016 4016 0 00 7016 7016 0 00
हरियजणज Haryana 6544 6544 0 00 10270 10270 0 00
दहमजचल परिश Himachal Pradesh 1683 1683 0 00 1700 1700 0 00
रमम कशमीि Jammu amp Kashmir 3277 2622 655 200 3277 2622 655 200
परजब Punjab 6564 6564 0 00 12638 12638 0 00
िजरसथजन Rajasthan 11885 11885 0 00 13276 13276 0 00
उतति परिश Uttar Pradesh 16220 16220 0 00 20498 20062 436 21
उततिजखड Uttarakhand 2002 2002 0 00 2216 2216 0 00
उततरी कषतर Northern Region 47925 47356 569 12 63166 61726 1440 23
छततीसगढ़ Chhattisgarh 4444 4128 316 71 4444 4270 174 39
गरिजत Gujarat 16263 16263 0 00 17053 16963 90 05
मधय परिश Madhya Pradesh 12328 12323 5 00 13815 13815 0 00
महजिजषटर Maharashtra 22361 22291 70 03 23864 23254 610 26
िमन औि दिउ Daman amp Diu 336 336 0 01 357 356 1 02
िजिि व नगि हवली Dadra amp Nagar Haveli 800 799 1 01 816 815 1 01
गोवज Goa 538 538 0 00 596 596 0 00
पशचिमी कषतर Western Region 53132 52965 167 03 56675 55821 853 15
आनधर परिश Andhra Pradesh 8977 8977 0 00 9459 9453 6 01
तलगजनज Telangana 10471 10471 0 00 10815 10815 0 00
कनजाटक Karnataka 12841 12841 0 00 12841 12841 0 00
किल Kerala 4264 4228 36 09 4264 4228 36 09
तममल नजड Tamil Nadu 15712 15712 0 00 15712 15712 0 00
पडचिी Puducherry 427 412 15 34 427 412 15 34
लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0
दकषकषणी कषतर Southern Region 49464 49464 0 00 49464 49464 0 00
बबहजि Bihar 4633 4633 0 00 5115 5084 31 06
िजमोिि घजटी ननगम DVC 3035 3035 0 00 3035 3035 0 00
झजिखणड Jharkhand 1210 1210 0 00 1339 1291 48 36
ओडडशज Odisha 4827 4827 0 00 5357 5357 0 00
पशशचम बगजल West Bengal 8287 8287 0 00 9130 9123 7 01
मसशककम Sikkim 100 100 0 00 106 106 0 00
अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7
परवी कषतर Eastern Region 21658 21658 0 00 23141 22733 408 18
अरणजचल परिश Arunachal Pradesh 133 131 2 15 138 138 0 01
असम Assam 1539 1508 31 20 1865 1809 56 30
मणणपि Manipur 204 199 5 25 219 216 3 12
मघजलय Meghalaya 357 357 0 00 374 372 1 04
ममज़ोिम Mizoram 108 105 3 28 121 119 2 17
नजगजलड Nagaland 127 125 2 16 156 138 18 116
बिपिज Tripura 249 249 0 00 298 293 5 17
उततर-परवी कषतर North-Eastern Region 2540 2535 5 02 2967 2850 117 39
समपणण भारत All India 169464 168745 719 04 177022 175528 1494 08
Note The revised data for March 2019 is not avaliable 26
अधिकतम वरवदयत आपरत ण शथिरत ररपोरण (परवाणरवलोकन) Peak Power Supply Position Report (Provisional)
आकड़ मगज वजट नट Figures in MW net
राजयStateमािण2019 March2019 अपरल2018 -मािण2019 April2018 to March2019
मजग की पनत ा म कमी मजग की पनत ा म कमी Demand not MetDemand not Met
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
Excludes the supply to Bangladesh
अपरल 2019 April2019 अपरल2018 -मािण2019 April2019 to April2019
उततरी कषतर Northern Region
चडीगढ़ Chandigarh(Data Not Received)दिलली Delhi
हरियजणज Haryana
दहमजचल परिश Himachal Pradeshरमम कशमीि Jammu amp Kashmir(Data
Not Received)परजब Punjab
िजरसथजन Rajasthanउतति परिश Uttar Pradesh
उततिजखड Uttarakhand
पशचिमी कषतर Western Region
छततीसगढ़ Chhattisgarh
Apr-Nov 2018- No cuts
Maximum Demand cut-58MW
Energy cut- 00020-00032 MUsday
गरिजत Gujarat
मधय परिश Madhya Pradesh
महजिजषटर Maharashtra
गोवज Goa
दकषकषणी कषतर Southern Region
आनधर परिश Andhra Pradesh
तलगजनज Telangana
कनजाटक Karnataka
किल Kerala
तममल नजड Tamil Nadu
पडचिी Puducherryपरवी कषतर Eastern Region
बबहजि Bihar
झजिखणड Jharkhand
ओडडशज Odisha
पशशचम बगजल West Bengal
No N
otifie
d Cu
ts
27
मािण 2019 म इडथरीर पर वरवदयत करौती का वरवरवरण Notified Power CutsRestrictions on Industries during April2019
राजय कषतर State Regionऊराणमाग करौती EnergyDemand Cut
No N
otifie
d Cu
tsNo
Notifie
d Cu
ts
अपरल2019 April 2019 अपरल2019 -अपरल2019 April2019 to April2019
उततरी कषतर Northern Region
चडीगढ़ Chandigarh Data not received Data not received
दिलली Delhi Data not received Data not received
हरियजणज Haryana 0811 hrsday 0811 hrsday
दहमजचल परिश Himachal Pradesh HPSEBL has only 2 agriculture consumers and uninterrupted
power is being supplied to agriculture sector
HPSEBL has only 2 agriculture consumers and uninterrupted
power is being supplied to agriculture sector
रमम कशमीि Jammu amp Kashmir Data not received Data not received
परजब Punjab 379 hrsday 379 hrsday
िजरसथजन Rajasthan 0630 hrsday 0630 hrsday
उतति परिश Uttar Pradesh 2157 hrsday 2157 hrsday
उततिजखड Uttarakhand 2359 hrsday 2359 hrsday
पशचिमी कषतर Western Region
छततीसगढ़ Chhattisgarh 18 hrsday 18 hrsday
गरिजत Gujarat 8 hrsday 8 hrsday
मधय परिश Madhya Pradesh Three-Phase Supply(Irrigation)- 0953 hrs day Three-Phase
(Mixed) Supply - 2334 hrs day
Three-Phase Supply(Irrigation)- 0953 hrs day Three-Phase
(Mixed) Supply - 2334 hrs day
महजिजषटर Maharashtra Three-Phase Supply(Irrigation)- 9 hrs day Three-Phase Supply(Irrigation)- 9 hrs day
गोवज Goa No restriction No restriction
दकषकषणी कषतर Southern Region
आनधर परिश Andhra Pradesh 07 hrsday 07 hrsday
तलगजनज Telangana 24 hrsday 24 hrsday
कनजाटक Karnataka 6 hrsday 6 hrsday
किल Kerala No Restrictions No Restrictions
तममल नजड Tamil Nadu 9 hrsday (6 hrs during day time and 3 hrs during night time) 9 hrsday (6 hrs during day time and 3 hrs during night time)
पडचिी Puducherry No Restrictions No Restrictions
परवी कषतर Eastern Region
बबहजि Bihar 18 hrsday 18 hrsday
झजिखणड Jharkhand 20 hrsday 20 hrsday
ओडडशज Odisha 24 hrsday 24 hrsday
पशशचम बगजल West Bengal 23 hrsday 23 hrsday
28
मारच 2019 कषि कषतर को षिदयत आपरतच का षििरण Power Supply to Agricultural Sector during March2019
राजय कषतर State Regionऔसत वरवदयत आपरत ण घनरो म Average Hours of Supply
On segregated feeders
SNo Contents Page
1 Growth of Installed Capacity since 6th Plan 29
2 Progress of Transmission Sector since 6th Plan 30
3 All India Yearly Coal consumption for Power Generation (Utilities)
4 All India Annual Per Capita Consumption of Electricity since -2006
5 Average cost of power supply amp Average realisation (Paisakwh)
6 Growth of Rural Electrification amp Pump Sets Energisation
7 Status of Hydro Schemes Cleared by the CEA in Apr-2019
Section G - Growth of Power Sector
31
32
(In MW)
Coal Gas Diesel Total
End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472
End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634
End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537
End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596
End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921
End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703
End of 12th Plan 19216288 2532938 83763 21832988 6780 4447842 50018 31960630
Up to Apr-2019 20070450 2493722 63763 22627934 678000 4539922 7764163 35610019
Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-17) = 51529 MW
Electricity Generation (MU) Targets and Achievements for 2016-17
Coal Gas Diesel Nuclear Hydro Res Total
2007045 2493722 637629 678000 453992 77641625 22925174
29
1 Growth of Installed Capacity Since 6th Plan
Plan YearThermal
Nuclear Hydro RES (MNRE) Total
2007045
2493722637629
678000
4539922
77641625
Total Installed Capacity 35610019 MW
Coal Gas Diesel Nuclear Hydro Res
Progress of Transmission Sector in the Country up to April 2019
1 TRANSMISSION LINES (All fig in CKM)
At the end of
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
6th plan 0 0 0 0 0 0 0 0 0 0 0 0 1831 4198 0 6029 1641 44364 0 46005 3472 48562 0 52034
7th plan 0 0 0 0 0 0 0 0 0 0 0 0 13068 6756 0 19824 4560 55071 0 59631 17628 61827 0 79455
8th plan 0 0 0 0 1634 0 0 1634 0 0 0 0 23001 13141 0 36142 6564 73036 0 79600 31199 86177 0 117376
9th plan 0 0 0 0 3234 1504 0 4738 751 409 0 1160 29345 20033 0 49378 8687 88306 0 96993 42017 110252 0 152269
10th plan 0 0 0 0 4368 1504 0 5872 1775 409 0 2184 48708 24730 0 73438 9444 105185 0 114629 64295 131828 0 196123
11th Plan 0 0 0 0 5948 1504 1980 9432 4839 411 0 5250 71023 30191 5605 106819 10140 125010 830 135980 91950 157116 8415 257481
12th Plan 6124 0 0 6124 5948 1504 1980 9432 25465 1177 4598 31240 92482 48240 17065 157787 11014 151276 978 163268 141033 202197 24621 367851
13th Plan (Up
to Mar2019)6124 0 0 6124 5948 1504 1980 9432 33692 1512 6605 41809 101335 58238 21173 180746 11734 162552 1010 175296 158833 223806 30768 413407
13th Plan (Up
to Apr-19)6124 0 0 6124 5948 1504 1980 9432 33745 1512 6605 41862 101335 58258 21173 180766 11734 162953 1010 175697 158886 224227 30768 413881
27150 600 MW of 132 kV Inter-Regional power transmission capacity links which are operated radially from time to time is not added in the total
75050
47900
24000
99050
30
Grand Total
Note - The figure upto the end of 10th plan in for stringing progress including the lines not commissioned Now only commissioned lines are reckoned Accordingly the figure for 10th plan (end) may read
as 187555 after adjusting with (-) 10852 Ckm
Inter-regional Power Transfer Capacity (MW)
plusmn 800 kV HVDC plusmn 500 kV HVDC 765 kV 400 kV 220 kV
IR addition in 12th
Plan (up to March
2017)
Inter-regional
Transmission
Capacity at the end
of Plan Period 2017-
22 (as on April19)
IR at the end of 11th
PlanIR at the end of 12th
Plan
IR Capacity Addition
at the end of Plan
Period 2017-22 (Till
April 19)
2004-05 27800
2005-06 28100
2006-07 30200
2007-08 33000
2008-09 35500
2009-10 36700
2010-11 38700
2011-12 41756
2012-13 45460
2013-14 48940
2014-15 53040
2015-16 54590
2016-17 57430
2017-18 60800
2018-19 62890
Year
2005-06
2006-07
2007-08
2008-09
2009-10
2010-11
2011-12
2012-13
2013-14
2014-15
2015-16
2016-17
2017-18
2018-19
2004-05 254 209 7568
2005-06 260 221 7636
2006-07 276 227 7423
2007-08 293 239 7727
2008-09 340 263 8713
2009-10 355 268 8870
2010-11 398 303 11975
2011-12 455 330 13514
2012-13 501 376 14867
2013-14 518 175
2014-15 520
Source- PFC Reports on the performance of State Power Utilities 31
1181
7335
7786
91441
8188
88363
957
1010
1075
1122
1149
(GrossGen+ Net Import) Mid-year population Provisional
5 Average cost of power supply amp average realization ( paiseKWH )
Yearcost of supply
(paiseunit)
Realization(paiseunit)
Including AgricultureOnly
Agriculture
6719
7171
3 All India yearly Coal Consumption for Power Generation (Utilities)
YEARCoal Consumption
Million Tonnes
4 All India Annual per Capita consumption of Electricity Since 2006
Per Capita Consumption ( kWh)
6314
Sl
NoExecuting Agency
Installed
Capacity (MW)Cost (Rs crore)
Date of
Clearance
32
Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as
Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received
from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made
available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified
villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is
independent of the earlier published reports
No Hydro Electric Project has been issued concurrenceAppraisal letter by CEA during April 2019
7 Status of Hydro Schemes Cleared by the CEA in Apr-2019
Name of Scheme
1999-002000-01
297594
010408 to 310309010409 to 310310
10th Plan
2005-062006-07
322968331020
6 Growth Of Rural Electrification amp Pumpsets Energisation
Plan Year
9th Plan2002-03
134092626
4111
Pump Sets Energised Villages Electricfied (Nos)
2001-02
284064367244
1218
27801997-981998-99
3207
482864
12632
1576036
4451722594
15455554
2314176
397343611750
2093311060316074
65109527813884
46708
18423975
499150
2003-042004-05
5743
9769
Cumu upto End of 10th Plan
010407 to 310308
010410 to 310311557976840909
010411 to 310312
412667
86293726
No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification
since 2004-05
65291374575 296361511th Plan
Cumu upto End of 11th Plan
596556 21212860
557439Cummulative up to end of 12th Plan
SN Contents Page
1 Rate of sale of power for the year 2016-17 33-41
RATE OF SALE OF POWER FOR THE YEAR 2016-17
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) NORTHERN REGION
CENTRAL SECTOR
BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 18000 66900 19800
CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 54000 222400 21600
CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 30000 144400 19600
CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 23100 91700 42600
PARBATI - III HPS NHPC LTD HYDRO-HYDRO 52000 68200 54800
DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 28000 95600 30000
CHUTAK NHPC LTD HYDRO-HYDRO 4400 22000 79800
DULHASTI HPS NHPC LTD HYDRO-HYDRO 39000 228000 56400
SALAL HPS NHPC LTD HYDRO-HYDRO 69000 342300 11000
TANAKPUR HPS NHPC LTD HYDRO-HYDRO 9420 43000 29600
URI HPS -I NHPC LTD HYDRO-HYDRO 48000 280300 16000
URI HPS - II NHPC LTD HYDRO-HYDRO 24000 147300 48600
NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 4500 24600 88200
SEWA - II NHPC LTD HYDRO-HYDRO 12000 47100 43400
ANTA CCPP NTPC LTD THERMAL-GASN 41930 67539 32400
AURAIYA CCPP NTPC LTD THERMAL-GASN 66336 53501 39100
BADARPUR TPS NTPC LTD THERMAL-COAL 70500 159153 44800
DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 84000 296170 42300
DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 98000 526686 46300
DADRI CCPP NTPC LTD THERMAL-GASHSD 82978 227469 33000
FARIDABAD CCPP NTPC LTD THERMAL-GASN 43159 115577 30800
RIHAND STPS I NTPC LTD THERMAL-COAL 100000 596766 24500
RIHAND STPS II NTPC LTD THERMAL-COAL 100000 737069 24600
RIHAND STPS III NTPC LTD THERMAL-COAL 100000 706546 30600
SINGRAULI STPS NTPC LTD THERMAL-COAL 200000 1394068 20400
TANDA TPS NTPC LTD THERMAL-COAL 44000 295438 40800
UNCHAHAR TPS I NTPC LTD THERMAL-COAL 42000 256454 39800
UNCHAHAR TPS II NTPC LTD THERMAL-COAL 42000 273577 38900
UNCHAHAR TPS III NTPC LTD THERMAL-COAL 21000 142780 43000
KOLDAM NTPC LTD HYDRO-HYDRO 80000 363260 43600
NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 303575 25841
RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 108000 668677 35374
NJHPS SJVNL HYDRO-HYDRO 150000 699496 23820
RAMPUR HPS SJVNL HYDRO-HYDRO 41202 195982 32260
TEHRI HPP THDC HYDRO-HYDRO 100000 272543 51800
KOTESHWAR HEP THDC HYDRO-HYDRO 40000 106244 53400
IGSTPS JHAJJAR ARAVALI P CPL THERMAL-COAL 150000 510429 49490
NEYVELI BARSINGSAR NEYVELI LIG CORP LTD THERMAL-LIG 25000 127520 38040
STATE SECTOR
PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 21000 14222 48200
PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 21000 19205 48400
PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 25000 102257 42600
PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 25000 62107 41800
DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 60000 312213 41000
RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 120000 35767442200
WYC HYDEL STATION HPGCL HYDRO-HYDRO 6240 20365 24900
GIRI POWER HOUSE HPSEB HYDRO-HYDRO 6000 13958 7600
ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 1695 5467 11900
BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 12000 18528 6700
GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 2250 7462 22500
BASSI POWER HOUSE HPSEB HYDRO-HYDRO 6600 29649 7500
BINWA POWER HOUSE HPSEB HYDRO-HYDRO 600 2749 19300
ANNEXURE-I
RATE OF SALE OF POWER FOR THE YEAR 2016-2017
Page 33
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) GAJ POWER HOUSE HPSEB HYDRO-HYDRO 1050 2914 26700
BANER POWER HOUSE HPSEB HYDRO-HYDRO 1200 2864 16200
HOLI POWER HOUSE HPSEB HYDRO-HYDRO 300 616 22500
THIROT POWER HOUSE HPSEB HYDRO-HYDRO 450 1126 22500
KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 1200 3064 22500
LARJI POWER HOUSE HPSEB HYDRO-HYDRO 12600 53677 23700
NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 250 750 31000
CHABA POWER HOUSE HPSEB HYDRO-HYDRO 175 465 23300
RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 150 101 13400
SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 200 000 22500
KILLAR HPSEB HYDRO-HYDRO 030 050 22500
BHABA AUGUMENP H HPSEB HYDRO-HYDRO 450 1276 22500
BS CHAMBA HPSEB HYDRO-HYDRO 045 099 19500
GUMMA HPSEB HYDRO-HYDRO 300 423 22500
GAS TURBINE POWER STATION IPGCL THERMAL-GAS 27000 67233 39300
PPS-I PPCL THERMAL-GAS 33000 175905 38300
PPS-III PPCL THERMAL-GAS 137120 196879 36100
LOWER JHELUM JampKPDD HYDRO-HYDRO 10500 60214 5100
UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 2260 10514 6300
UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 10500 44202 8500
GANDHARBAL JampKPDD HYDRO-HYDRO 1500 8925 4700
KARNAH MPH JampKPDD HYDRO-HYDRO 200 1122 31000
CHENANI I JampKPDD HYDRO-HYDRO 2330 10892 6600
CHENANI II JampKPDD HYDRO-HYDRO 200 1188 9300
CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 750 3634 14200
IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 375 2108 18500
IGO MERCHELLONG JampKPDD HYDRO-HYDRO 300 1572 29700
PAHALGAM MHP JampKPDD HYDRO-HYDRO 450 1713 32900
MARPACHOO JampKPDD HYDRO-HYDRO 075 375 29800
HAFTAL JampKPDD HYDRO-HYDRO 100 483 28700
SANJAK JampKPDD HYDRO-HYDRO 126 441 36000
SEWA-III JampKPDD HYDRO-HYDRO 900 3273 20200
BHADERWAH JampKPDD HYDRO-HYDRO 150 935 8900
BAZGO JampKPDD HYDRO-HYDRO 030 108 33300
SUMOOR JampKPDD HYDRO-HYDRO 010 045 35400
HUNDER JampKPDD HYDRO-HYDRO 040 176 26200
STAKNA JampKPDD HYDRO-HYDRO 400 1933 4100
KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 124000 662879 31360
SURATGARH TPS RRVUNL THERMAL-COAL 150000 402328 41730
CHHABRA TPS 1amp 2 RRVUNL THERMAL-COAL 50000 305946 36700
CHHABRA TPS 3 RRVUNL THERMAL-COAL 25000 151536 36700
CHHABRA TPS 4 RRVUNL THERMAL-COAL 25000 155896 36700
RAMGARH GT POWER PROJECT RRVUNL THERMAL-COAL 22050 43177 41800
RAMGARH GAS T P PROJECT 3 RRVUNL THERMAL-GAS 5000 93615 41800
DHOLPUR C C POWER PROJECT RRVUNL THERMAL-R-LNG 33000 9486 46110
MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 14000 20855 34192
MINI MICRO HYDEL (MMH) P S RRVUNL HYDRO-HYDRO 2385 851 37800
KALISINDH TPP 1 RRVUNL THERMAL-COAL 60000 341543 45000
KALISINDH TPP 2 RRVUNL THERMAL-COAL 60000 211588 45000
KHARA HEP UPJVNL HYDRO-HYDRO 7200 26654 7200
MATATILLA HEP UPJVNL HYDRO-HYDRO 3060 12219 6500
OBRA HEP UPJVNL HYDRO-HYDRO 9900 21517 6300
RIHAND UPJVNL HYDRO-HYDRO 30000 57369 5500
ANPARA A TPS UPRVUNL THERMAL-COAL 63000 317536 27000
ANPARA B TPS UPRVUNL THERMAL-COAL 100000 705605 22700
ANPARA D UPRVUNL THERMAL-COAL 100000 300158 39800
HARDUAGANJ TPS UPRVUNL THERMAL-COAL 16500 45817 49200
HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 50000 304389 46600
OBRA A TPS UPRVUNL THERMAL-COAL 28800 13158 34000
OBRA B TPS UPRVUNL THERMAL-COAL 100000 328124 21900
Page 34
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) PANKI TPS UPRVUNL THERMAL-COAL 21000 66488 50300
PARICHHA TPS UPRVUNL THERMAL-COAL 22000 38762 49400
PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 42000 231931 45600
PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 50000 276722 50400
CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 24000 70845 8290
CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 14400 75366 8390
DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 3375 9595 12080
DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 5100 18701 10520
KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4140 17359 12330
KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 12000 33001 9420
KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 3000 11953 8320
TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 9000 33983 12460
MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 30400 124510 16110
RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 19800 17897 10550
MPUR UTTARAKHAND JVNL HYDRO-HYDRO 930 5121 19200
PATHRI UTTARAKHAND JVNL HYDRO-HYDRO 2040 11636 14200
GALOGI UTTARAKHAND JVNL HYDRO-HYDRO 300 648 12500
PRIVATE SECTOR
MGTPP CLP INDIA PVT LTD THERMAL-COAL 132000 268902 41940
SHRINAGAR HEP ALAKNANDA HPCL HYDRO-HYDRO 33000 127414 48800
GAMA INFRAPROP CCPP GAMA INFRAPROP PVT THERMAL-GAS 22500 52686 47000
PPGCL (BARA) JP POWER VENTURES LTD THERMAL-COAL 198000 448200 38500
MALANA HEP MALANA PCL HYDRO-HYDRO 8600 26354 29792
MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 10000 30369 32580
ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 19200 56347 36079
KASHANG HEP H P PCL HYDRO-HYDRO 19500 5034 29200
BASPA-II HEP HBPCL HYDRO-HYDRO 30000 132769 13600
KARCHAM WANGTOO HEP HBPCL HYDRO-HYDRO 100000 434386 36600
RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 108000 582600 43700
RITHALA COMBI CY POWER PLANT TATA POWER DDL THERMAL-GAS 9480 000 11900
RAJPURA TPS NABHA POWER LTD THERMAL-GAS 140000 901484 39000
TALWANDI SABO POWER LTD TALWANDI SABO POWER LTD THERMAL-COAL 198000 636040 49548
ROJA THERMAL POWER STATION ROJA POWER SCL THERMAL-COAL 120000 727200 43400
KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 34400 63400
BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 36000 62600
MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 38200 60800
UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 37900 61500
KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 42300 58800
LALITPUR PGCL BAJAJ ENERGY PVT LTD THERMAL-COAL 198000 359400 47300
PRAYAGRAJ PGCL PRAYAGRAJ PGCL THERMAL-COAL 132000 448200 38595
KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 132000 783182 33438
WESTERN REGION
CENTRAL SECTOR
INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 100000 325333 23892
OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 52000 141663 34001
GANDHAR CCPP NTPC LTD THERMAL-GAS 65739 221924 28700
KAWAS CCPP NTPC LTD THERMAL-GASN 65620 167929 27000
KORBA I amp II NTPC LTD THERMAL-COAL 210000 1499171 20500
KORBA III NTPC LTD THERMAL-COAL 50000 358746 26600
SIPAT STPS I NTPC LTD THERMAL-COAL 198000 1479902 26800
SIPAT STPS II NTPC LTD THERMAL-COAL 100000 766549 26500
VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 126000 693142 25800
VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 100000 608781 23800
VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 100000 673475 27600
VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 100000 655924 32900
VINDHYACHAL STPS V NTPC LTD THERMAL-COAL 50000 328265 31700
MOUDA I NTPC LTD THERMAL-COAL 100000 343130 44500
MOUDA Ii NTPC LTD THERMAL-COAL 66000 40637 39900
RATNAGIRI GAS amp POWER PVT LTD RGPPL THERMAL-GAS 196708 442485 47000
KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 000 24729
TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 32000 201227 10740
Page 35
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 365122 19069
TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 787444 29324
STATE SECTOR
GSEG-HAZIRA15610 MW GUJARAT S ENEGEN LTD THERMAL-GAS 15610 1805 28200
GSEG-HAZIRA35143 MW GUJARAT S ENEGEN LTD THERMAL-GAS 35130 22276 51300
GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 21978 51800
AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 13929 26100
KORBA TPS EAST CSPGCL THERMAL-COAL 44000 198673 33880
DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 365808 27570
KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 316500 30420
HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 532878 19410
CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 515 58300
MTTPS CHAMPA U-I CSPGCL THERMAL-COAL 50000 220376 39000
MTTPS CHAMPA U-II CSPGCL THERMAL-COAL 50000 23709 10000
SHP GANGREL CSPGCL HYDRO-HYDRO 1000 2350 36790
BANGO HEP CSPGCL HYDRO-HYDRO 12000 14662 8900
MHP KORBA WEST CSPGCL HYDRO-HYDRO 170 859 38190
SIKASAR HEP CSPGCL HYDRO-HYDRO 700 418 26870
DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8843 74500
DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 19446 51500
GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 66388 71600
GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127488 41300
KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 96072 43900
KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 29841 56400
SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 184966 58800
UKAI 1-5 GSECL THERMAL-COAL 85000 204891 46900
UKAI TPS 6 GSECL THERMAL-COAL 50000 284448 48200
WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 271999 58300
WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 82808 44100
KADANA HPS GSECL HYDRO-HYDRO 24200 34433 16800
UKAI HPS GSECL HYDRO-HYDRO 30500 40585 6100
TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 123000 11500
BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 8900 10900
BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 7200 27500
JHINNA HPS MPPGCL HYDRO-HYDRO 2000 9700 18500
RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 44300 3400
GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 17300 4600
SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 4100 16900
MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 14600 27000
PENCH HPS MPPGCL HYDRO-HYDRO 16000 23700 8100
RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 3000 16900
AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 134400 35100
SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 283800 38700
SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 344600 34300
SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 111600 61600
SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 211800 58000
SSTPS PH-I MPPGCL THERMAL-COAL 120000 233100 84300
BHUSAWAL TPS MSPGCL THERMAL-COAL 142000 566258 51100
CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1365682 33700
KHAPERKHEDA MSPGCL THERMAL-COAL 134000 706207 39100
KORADI TPS MSPGCL THERMAL-COAL 62000 443206 42000
NASIK TPS MSPGCL THERMAL-COAL 63000 297275 47000
PARLI TPS MSPGCL THERMAL-COAL 113000 175934 71600
PARAS MSPGCL THERMAL-COAL 50000 267931 38700
URAN CCPP MSPGCL THERMAL-GAS 67200 320330 30600
KOYANA MSPGCL HYDRO-HYDRO 195600 328155 13100
SMALL HYDRO POWER PLANTS MSPGCL HYDRO-HYDRO 45400 93062 30500
BHIRA MSPGCL HYDRO-HYDRO 8000 10046 8400
TILLARI MSPGCL HYDRO-HYDRO 8900 10584 3100
SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 233298 20500
SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 87633 20500
PRIVATE SECTOR
Page 36
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 81282 46750
JNSTPP(JAYPEE NIGRIE) JP POWER VENTURES LTD THERMAL-COAL 132000 726695 29310
MB POWER MB POWER THERMAL-COAL 120000 345632 38310
ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 754922 28671
ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 780761 23495
ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 198000 1263784 32090
ADANI POWER MAHARA ADANI POWER LTD THERMAL-COAL 330000 1666191 34124
AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 170065 36827
SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 252035 45129
ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 458551 36000
ESSAR POWER MP LTD ESSAR POWER MP LTD THERMAL-COAL 60000 243040 28600
VEDANTA LTD (P P -I) VEDANTA LTD THERMAL-GAS 3000 15044 24000
VEDANTA LTD (P P -II) VEDANTA LTD THERMAL-GAS 3000 21293 24000
PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 8234600 24000
165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 5850 64390
145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 68717 40349
SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 132655 28776
SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 144686 38567
MUNDRA UMPPCOASTAL GUJARAT POWER
LTD THERMAL-IMP COAL 400000 2530300
23900
LANCO AMARKANTAK TPP PATHADIH
U-ILANCO AMARKAN POWER LTD THERMAL-COAL 30000 195500
29200
LANCO AMARKANTAK TPP PATHADIH
U-IILANCO AMARKAN POWER LTD THERMAL-COAL 30000 206900
27600
BARADARHA TPS D B POWER LTD THERMAL-COAL 120000 677373 29200
JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 405000 28900
JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 453000 40500
DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 339437 40700
TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 293400 44000
TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 137200 37000
TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 174900 44000
BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 92900 14100
BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23700 34300
KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 27600 48300
CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2530300 23900
BHANDARDRA HEP -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 2475 54900
SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 161400 26500
SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 445000 39000
SOTHERN REGION
CENTRAL SECTOR
NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 325699 54820
NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 305532 39880
NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 998805 38510
NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 113016 54070
NEYVELI TAMILNADU POWER LTD JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 625274 42200
VALLUR TPS NTPC TECL THERMAL-COAL 150000 856438 42350
R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 1493 84300
RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1502919 29400
RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 341291 31800
SIMHADRI I NTPC LTD THERMAL-COAL 100000 688382 36800
SIMHADRI II NTPC LTD THERMAL-COAL 100000 663657 43400
KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 593110 31324
MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 291625 21764
KKNPP-1 amp 2 NPCIL NUCLEAR-NUCLEAR 200000 572609 40948
MINICOY LAKSHADEEP THERMAL-DIESEL 340 770 29600
KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1097 29600
AMINI LAKSHADEEP THERMAL-DIESEL 265 509 29600
ANDROTT LAKSHADEEP THERMAL-DIESEL 219 524 29600
KALPENI LAKSHADEEP THERMAL-DIESEL 175 356 29600
AGATTI LAKSHADEEP THERMAL-DIESEL 195 658 29600
KADMAT LAKSHADEEP THERMAL-DIESEL 190 414 29600
KILTAN LAKSHADEEP THERMAL-DIESEL 150 269 29600
CHETLET LAKSHADEEP THERMAL-DIESEL 100 139 29600
BITRA LAKSHADEEP THERMAL-DIESEL 043 024 29600
BANGARAM LAKSHADEEP THERMAL-DIESEL 018 009 29600
Page 37
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) STATE SECTOR
Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 721811 46500
Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 50000 336142 46500
RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 237358 46500
RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 239926 46500
RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 124500 46500
SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 62109 46500
UPPER SILERU APGENCO HYDRO-HYDRO 24000 33000 46500
LOWER SILERU APGENCO HYDRO-HYDRO 46000 81066 46500
DONKARAI APGENCO HYDRO-HYDRO 2500 6007 46500
PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 1262 46500
CHETTIPETA APGENCO HYDRO-HYDRO 100 214 46500
MUCHKUND APGENCO HYDRO-HYDRO 12000 37571 46500
NAGARJUNASAGAR RCPH APGENCO HYDRO-HYDRO 9000 606 46500
TUNGABHADRA HES amp HAMPI(AP
Share)
APGENCO HYDRO-HYDRO 7200 6100 46500
KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 352232 42600
KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 288131 32500
KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 319272 46500
RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 40073 44300
KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 308317 46000
KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 308963 51300
SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 61004 76600
NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 17960 75300
PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 20873 58300
POCHAMPAD-I TSPGENCO HYDRO-HYDRO 2700 5455 29800
POCHAMPAD-II TSPGENCO HYDRO-HYDRO 900 1932 40700
NIZAMSAGAR TSPGENCO HYDRO-HYDRO 1000 1126 53400
RAICHUR TPS 1 to 7 KPCL THERMAL-COAL 147000 890866 43800
RAICHUR TPS 8 KPCL THERMAL-COAL 25000 159523 48200
BELLARI TPS 1 KPCL THERMAL-COAL 50000 318679 51100
BELLARI TPS 2 KPCL THERMAL-COAL 50000 232347 55600
BELLARI TPS 3 KPCL THERMAL-COAL 70000 47565 34400
BHADRA PH KPCL HYDRO-HYDRO 3920 2369 45900
GERUSUPPA PH KPCL HYDRO-HYDRO 24000 26990 22000
GHAT PRABHA HEP KPCL HYDRO-HYDRO 3200 4777 25300
KADRA HPS KPCL HYDRO-HYDRO 15000 16889 26800
NAGJHARI KPCL HYDRO-HYDRO 90000 155159 9800
KODASALLI DPH KPCL HYDRO-HYDRO 12000 14854 19200
MUNIRA+MGH+SPH+SPH KPCL HYDRO-HYDRO 22640 48211 7900
SHARAVATHY HPS KPCL HYDRO-HYDRO 108550 276215 5400
ALMATTI DPH KPCL HYDRO-HYDRO 29000 39611 24600
VARAHI UGPH KPCL HYDRO-HYDRO 46000 71368 15600
IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 17196 15300
IDUKKI HPS KSEB HYDRO-HYDRO 78000 137905 15300
KAKKAD HPS KSEB HYDRO-HYDRO 5000 13063 15300
KALLADA HPS KSEB HYDRO-HYDRO 1500 4436 15300
KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 46544 15300
KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 635 15300
LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 30822 15300
MALANKARA HPS KSEB HYDRO-HYDRO 1050 2474 15300
MATTUPETTY KSEB HYDRO-HYDRO 200 230 15300
MALAMPUZHA KSEB HYDRO-HYDRO 250 063 15300
CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 864 15300
URUMI ST I amp II KSEB HYDRO-HYDRO 615 903 15300
LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 248 15300
NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7765 19625 15300
PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 16601 15300
PANNIAR HPS KSEB HYDRO-HYDRO 3240 6217 15300
PORINGALKUTHU KSEB HYDRO-HYDRO 3600 10052 15300
PORINGALKUTHU LBE KSEB HYDRO-HYDRO 1600 9438 15300
PEPPARA KSEB HYDRO-HYDRO 300 395 15300
POOZHITHODE KSEB HYDRO-HYDRO 480 1045 15300
Page 38
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) PEECHI KSEB HYDRO-HYDRO 125 040 15300
RANI-PERUNADU KSEB HYDRO-HYDRO 400 585 15300
SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 79783 15300
SENGULAM HPS KSEB HYDRO-HYDRO 5120 11558 15300
SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 16711 15300
VILANGAD KSEB HYDRO-HYDRO 750 1578 15300
BARAPOLE KSEB HYDRO-HYDRO 1500 1932 15300
VELLATHOOVAL KSEB HYDRO-HYDRO 360 305 15300
CHIM0NY KSEB HYDRO-HYDRO 250 156 15300
ADYANPARA KSEB HYDRO-HYDRO 350 501 15300
BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 554 15300
KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 3801 15300
KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 23132 32800
ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 14416 62280
METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 523970 62280
METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 321270 62280
NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 336575 62280
NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 591240 62280
TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 508966 62280
KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 30897 62280
VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 18720 90699 62280
KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 33593 62280
BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 1047 62280
PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 1250 62280
PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 330 62280
MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 4897 62280
MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 032 62280
KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15681 62280
KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 40608 62280
KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 21342 62280
KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 4717 62280
KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4322 62280
KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2399 62280
METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 4416 62280
METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 8035 62280
BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2187 62280
BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2359 62280
BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2511 62280
BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 1949 62280
BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 1819 62280
POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 172 62280
SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 241 62280
MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 026 62280
THIRUMOORTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 136 62280
PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 9309 62280
VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 353 62280
SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 4192 62280
PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 6571 62280
SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 1186 62280
SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6319 62280
ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 6122 62280
KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 28674 62280
SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 18381 62280
SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 4258 62280
KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 12680 62280
KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4201 62280
ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 000 62280
PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 19175 62280
AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 078 62280
BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 504 62280
BHAVANI KATTALAI (BKB)(IIIampIII BB I amp II)TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 5847 62280
PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 000 62280
Page 39
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) SRI DAMODARAM STPS APPDCL THERMAL-COAL 160000 808108 36300
PRIVATE SECTOR
KARUPPUR TANJORE LANCO TANJORE PCL THERMAL-GAS 12000 48096 28770
SIMHAPURI ENERGY LTD SIMHAPURI ENERGY LTD THERMAL-COAL 60000 143900 39100
JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 7111 45500
SBU 1 JSW ENERGY LTD
VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 26000 159100
43300
SBU 2 JSW ENERGY LTD
VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 60000 247900
42800
LANCO KPLLANCO KONDAPALLI POWER
LTDTHERMAL-GAS 36814 85060
25776
LANCO KPL STG -IILANCO KONDAPALLI POWER
LTDTHERMAL-GAS 36600 12979
46330
LANCO KPL STG -IIIALANCO KONDAPALLI POWER
LTDTHERMAL-GAS 37100 85710
46330
LANCO KPL STG -III BLANCO KONDAPALLI POWER
LTDTHERMAL-GAS 37100 43639
46330
HINDUJA NATIONAL PCL HINDUJA NATIONAL PCL THERMAL-COAL 104000 303000 38200
MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 121164 49940
UDUPI POWER COR LTD ADANI POWER LTD THERMAL-COAL 120000 754613 42500
SPECTRUM POWER GENERATION
LTD SPECTRUM PG LTD THERMAL-GASN 20525 9256812
34952
TAQA NEYVELI POWER COM PVT
LTD TAQA NEYVELI THERMAL-LIG 25000 5840
34500
ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 251000 51000
ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 207860 36800
GMR VEMAGIRI POWER GENERATION
LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 30117
46450
EASTERN REGION
CENTRAL SECTOR
MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 64675 53113
MTPS STAGE - II KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 39000 1432 69138
BOKARO `B` TPS DVC THERMAL-COAL 63000 145670 31539
MEJIA TPS U 1-3 DVC THERMAL-COAL 63000 348298 31552
MEJIA TPS U 4 DVC THERMAL-COAL 21000 116099 34997
MEJIA TPS U 5-6 DVC THERMAL-COAL 50000 276427 35976
MEJIA TPS U 7-8 DVC THERMAL-COAL 100000 552854 36991
DURGAPUR STEEL TPS DVC THERMAL-COAL 100000 665550 39323
DURGAPUR TPS DVC THERMAL-COAL 21000 59270 35416
RAGHUNATHPUR TPS DVC THERMAL-COAL 120000 201650 35326
MAITHON HYDEL STA DVC HYDRO-HYDRO 6320 12200 17984
CHANDRAPURA TPSU1-3 DVC THERMAL-COAL 42000 257610 35095
CHANDRAPURA TPSU7-8 DVC THERMAL-COAL 50000 306673 34987
KODERMA TPS DVC THERMAL-COAL 100000 380180 38131
PANCHET HPS DVC HYDRO-HYDRO 8000 13360 17984
TILLAYA HPS DVC HYDRO-HYDRO 400 1410 17984
RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34700 35400
TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 277300 23200
TLDP -III NHPC LTD HYDRO-HYDRO 13200 55400 62000
TLDP -IV NHPC LTD HYDRO-HYDRO 16000 60300 25600
FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 957219 33700
FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 308943 41000
BONGAINGAON TPS NTPC LTD THERMAL-COAL 25000 153663 58600
KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 542277 34200
KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 942591 34200
BARH-II NTPC LTD THERMAL-COAL 132000 728021 44500
TALCHER TPS NTPC LTD THERMAL-COAL 46000 335521 30100
TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 702319 25600
TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1436521 24700
STATE SECTOR
BTPS(RampM) BIHAR STATE PGCL THERMAL-COAL 22000 12142 39700
BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 98331 10602
HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 50593 9482
CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 19689 2605
RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 53192 6033
UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 147208 14637
Page 40
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 60353 4519
IB TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 288567 25000
J P H GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 210 038 61100
MEYONG CHU GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 400 1086 61100
TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 122667 38200
DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 214339 43321
KOLAGHAT THERMAL POWER
STATION
WEST BENGAL PDCL THERMAL-COAL 126000 538269 31603
BAKRESHWAR THERMAL POWER
PLANT
WEST BENGAL PDCL THERMAL-COAL 105000 634876 32154
BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 45000 166855 33299
SANTHALDIH THERMAL POWER
STATION
WEST BENGAL PDCL THERMAL-COAL 50000 336442 34932
SAGARDIGHI THERMAL POWER
PROJECT
WEST BENGAL PDCL THERMAL-COAL 160000 423121 34705
JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 20344 68900
RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 24559 68900
TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 4623 68900
PURULIA PUMPED STORAGE
PROJECT
WEST BENGAL SEDCL HYDRO-HYDRO 90000 108816 68900
MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2768 68900
PRIVATE SECTOR
CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 49474 20230
CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 555500 70200
HALDIA ENERGY HALDIA ENERGY LTD THERMAL-COAL 60000 371000 50400
DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3688 63400
KAMALANGA TPS GMR KAMALANGA ENERGY LTD THERMAL-COAL 105000547670
33300
ADHUNIK POWER U-1 ADHUNIK POWER THERMAL-COAL 27000 158 44060
ADHUNIK POWER U-2 ADHUNIK POWER THERMAL-COAL 27000 168 44250
VL-JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 332800 23622
JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 43000 45250
JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 71700 37030
JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 70700 35920
JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 71100 38870
JOJOBERA UNIT 5 TATA POWER COM LTD THERMAL-COAL 12000 79300 44560
JOJOBERA UNIT 6 TATA POWER COM LTD THERMAL-WHR 12000 83700 12840
IEL KALINGANAGAR U-I TATA POWER COM LTD THERMAL-WG 6750 33400 22500
IEL KALINGANAGAR U-II TATA POWER COM LTD THERMAL-WG 6750 34800 22500
MAITHON UNIT 1 amp 2 TATA POWER COM LTD THERMAL-COAL 105000 678000 36100
HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 27500 24340
HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 28400 24340
HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 15800 24310
NORTH EASTERN REGION
CENTRAL SECTOR
LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 74100 36600
AGARTALA GT NEEPCO THERMAL-GAS 13500 88611 27210
ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 153111 32310
DOYANG HEP NEEPCO HYDRO-HYDRO 7500 25598 49801
KOPILI HEP NEEPCO HYDRO-HYDRO 20000 98186 11491
KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 19582 20237
KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 10310 17968
RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 124093 22945
TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 10100 17344 39000
STATE SECTOR
HYDRO POWER (122 Stns) ITANAGAR GOVT OF ARUNACHAL
PRADESHHYDRO-HYDRO 6971 6217270
24600
KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39514 17337
LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 82327 36810
NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 33318 48290
MYNTRIANG SHEP ST II ASSAM POWER GENCO HYDRO-HYDRO 300 567 35776
LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 9130 49200
LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 012 49200
DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 022 49200
TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 000 49200
UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 4990 16000
UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 6476 37000
UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 16494 14600
UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 3600 9556 15000
SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 758 8000
MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44070 44800
KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 154 41400
TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 091 41400
MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 411 41400
MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 394 41400
KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 760 41400
SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 3264 41400
LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 044 41400
BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 18953 28000
ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 43585 28200
GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 4080 11100
Note
LIG Lignite N Naptha WHR Waste Heat Recovery
Page 41
Line
1 2 3 4 5 6
1 400 Bhadla (PG) - Bhadla (RVPN) line DC PGCIL 53
53
2 400 LILO of one ckt Jhanor - Navsari at Vav Ss DC GETCO 20
3 220 Banda-Chitrakoot Line DC UPPTCL 226
4 220 Gorakhpur (PG)-Gola line DC UPPTCL 82
5 220 Hapur(765) - Faridnagar line SC UPPTCL 11
6 220 Kalikiri - Madanapalli line DC APTRANSCO 60
7 220LILO of Gr Noida -Noida Sec-129 at Noida
Sec-148DC UPPTCL 1
8 220LILO of one Ckt of Badshahpur Pali at Sec-
65 GurgaonDC HVPNL 3
9 220 Sultanpur-Sangipur LILO Section at Amethi DC UPPTCL 18
421
0
474
20(2)
Grand Total
2Transmission Lines (220 kV and above) CommissionedReady for commissioning During Apr-2019
Voltage
Level (kV)Name of Transmission Lines
Circuit
Type
Executing
Agency
CENTRAL SECTOR
Total of CENTRAL SECTOR
STATE SECTOR Sector
Total of STATE SECTOR
PRIVATE SECTOR
Total of PRIVATE SECTOR
SlNo
Length(CKm)
As on 30-04-19
SN Contents Page
1 Executive summary of Target and Achievement of Substations during 2019-20 21(1)
2Sub Stations (220 kV and above) commissionedready for commisssioning during Apr-
201921(2)
Section D - Sub Stations
1 Executive summary of Target and Achievement of Substations during 2019-2020 As on 30-04-19
(All figures in circuit MVA)
Ce
ntr
al S
ecto
r
Sta
te S
ecto
r
JV
Pri
va
te S
ecto
r
To
tal
Ce
ntr
al S
ecto
r
Sta
te S
ecto
r
JV
Pri
va
te S
ecto
r
To
tal
Ce
ntr
al S
ecto
r
Sta
te S
ecto
r
JV
Pri
va
te S
ecto
r
To
tal
Ce
ntr
al S
ecto
r
Sta
te S
ecto
r
JV
Pri
va
te S
ecto
r
To
tal
Ce
ntr
al S
ecto
r
Sta
te S
ecto
r
JV
Pri
va
te S
ecto
r
To
tal
Ce
ntr
al S
ec
tor
Sta
te S
ec
tor
JV
Pri
va
te S
ec
tor
Gra
nd
To
tal
3000 0 0 3000 0 0 0 0 18000 3000 6000 27000 5205 19665 4260 29130 800 21786 0 22586 27005 44451 10260 81716
Apr19 Programme 0 0 0 0 0 0 0 0 3000 0 3000 6000 0 1000 2000 3000 0 800 0 800 3000 1800 5000 9800
Achievement 0 0 0 0 0 0 0 0 500 0 0 500 815 1980 0 2795 0 1305 0 1305 1315 3285 0 4600
Upto Apr-19 Programme 0 0 0 0 0 0 0 0 3000 0 3000 6000 0 1000 2000 3000 0 800 0 800 3000 1800 5000 9800
Achievement 0 0 0 0 0 0 0 0 500 0 0 500 815 1980 0 2795 0 1305 0 1305 1315 3285 0 4600
21(1)
220 kV Grand Total 800 kV 500 kV
Programme 2019-20
Programme
Achievement
HVDC765 kV 400 kV
As on 30-04-19
Sl Voltage Ratio Capacity
No (kVkV) (MWMVA)
1 2 3 4 5
1 Bhadla SS (3x1500 3x500 MVA) 765400 PGCIL 500
2 Extn at Tumkur (Pavagada ) PS (2x500 MVA) 400220 PGCIL 500
3 Bongaigaon (2nd ICT) Ss 400220 PGCIL 315
Total of CENTRAL SECTOR 1315
4 Motiram Adda Gorakhpur (Aug) (Additional TF) 400220 UPPTCL 240
5 Muradnagar-II Ghaziabad (Aug) (Additional TF) 400220 UPPTCL 240
6 Noida Sec- 148 GBNagar (New) 400220 UPPTCL 5007 Sarnath Varanasi (Aug) TF- II (500-315) 400220 UPPTCL 1858 Sarojininagar Lucknow Aug) TF- II (500-315) 400220 UPPTCL 185
9 Unnao (Aug) TF-III 400220 UPPTCL 31510 Nawada SS 400220 HVPNL 31511 Kharepatan SS 22033 MSETCL 2512 Prathipadu SS 220132 APTRANSCO 10013 Pali Ss 22066 HVPNL 160
14 A-5 Faridabad Ss 22066 HVPNL 60
15 Rentachintala Ss Aug(3X100-2x100) 220132 APTRANSCO 10016 Amethi Ss 220132 UPPTCL 160
17 Gajokhar Varanasi (Aug) TF- II (160-100) 220132 UPPTCL 60
18 Gola Gorakhpur (New) 220132 UPPTCL 160
19 Khurja Bulandshahr (Aug) TF- II (200-160) 220132 UPPTCL 40
20 RC Green GB Nagar (Aug) TF-II (160-100) 220132 UPPTCL 60
21 Sikandrabad Bulandshahr (Aug) (Additional TF) 220132 UPPTCL 160
22 Sitapur (Aug) (Additional TF) 220132 UPPTCL 160
23 Sohawal Ayodhya (Aug) TF-II (160-100) 220132 UPPTCL 60
TOTAL STATE SECTOR 3285
GRAND TOTAL 4600
21(2)
CENTRAL SECTOR
STATE SECTOR
2Sub-Stations (220 kV and above) CommissionedReady for commissioning During Apr-2019
Name of Sub Stations Executing Agency
SN Contents Page
1 Electricity Generation (MU) Targets and Achievements for 2019-20 22
Section E - Electricity Generation
Programme Achievement Ach Programme Achievement Ach
Central Sector 37545100 3177900 3129530 9848 3177900 3129530 9848
State Sector 37498600 3322500 2950558 8881 3322500 2950558 8881
PvtIPP Sector 37346200 3236400 3195940 9875 3236400 3195940 9875
PvtUTL Sector 1823100 159300 165579 10394 159300 165579 10394
Total 114213000 9896100 9441607 9541 9896100 9441607 9541
Central Sector 5661700 386100 481390 12468 386100 481390 12468
State Sector 6680500 498200 536514 10769 498200 536514 10769
PvtIPP Sector 1206900 57300 80405 14032 57300 80405 14032
PvtUTL Sector 144100 12300 10930 8886 12300 10930 8886
Total 13693200 953900 1109239 11628 953900 1109239 11628
Central Sector 4472000 367300 317765 8651 367300 317765 8651
Total 4472000 367300 317765 8651 367300 317765 8651
Bhutan Import 621800 17500 24396 13941 17500 24396 13941
Central Sector 47678800 3931300 3928685 9993 3931300 3928685 9993
State Sector 44179100 3820700 3487072 9127 3820700 3487072 9127
Pvt Sector 40520300 3465300 3452854 9964 3465300 3452854 9964
Total 133000000 11234800 10893007 9696 11234800 10893007 9696
Provisional based on actual-cum-Assesment
Figs in MU
Cummulative
Achievement
Cummulative
Achievement
Mar-19 Mar-18 Upto Mar-2019 Upto Mar-2018
984785 869291 12675910 10183949
22
1 Electricity Generation (MU) Targets and Achievememts for 2019-20
All India Energy Generation During Apr-19 to Apr-19 (MU)
Target (2019-20)Apr-19 to Apr-19
Sector
Hydro
Thermal
Nuclear
Renewable Energy Generation
Achievement
Apr-2019
98961
95393673
112348
94416
11092
3178
108930
0
20000
40000
60000
80000
100000
120000
Thermal Hydro Nuclear Total
Programme
Achievement
SN Contents Page
1 Energy Power Supply Position (Provisional) for Apr-2019 and during Apr-19 to Apr-19 23
2 Peak Power Supply Position (Provisional) for Apr-2019 and during Apr-19 to Apr-19 24
3 Energy Power Supply Position (Revised) for Mar-2019 and during Apr-19 to Mar-19 25
4 Peak Power Supply Position (Revised) for Mar-2019 and during Apr-19 to Mar-19 26
5 Notified Power cuts Restrictions on Industries during Apr-2019 27
6 Power Supply to Agricultural Sector during Apr-2019 28
Section F - Power supply position
आकड़ मममलयन यननट नट Figures in MU net
ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied
कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )
चडीगढ़ Chandigarh 117 117 0 00 117 117 0 00
दिलली Delhi 2698 2698 1 00 2698 2698 1 00
हरियजणज Haryana 3773 3773 0 00 3773 3773 0 00
दहमजचल परिश Himachal Pradesh 777 777 0 00 777 777 0 00
रमम कशमीि Jammu amp Kashmir 1604 1296 308 192 1604 1296 308 192
परजब Punjab 3646 3646 0 00 3646 3646 0 00
िजरसथजन Rajasthan 6210 6208 2 00 6210 6208 2 00
उतति परिश Uttar Pradesh 10179 10148 32 03 10179 10148 32 03
उततिजखड Uttarakhand 1120 1120 0 00 1120 1120 0 00
उततरी कषतर Northern Region 30094 29786 308 10 30094 29786 308 10
छततीसगढ़ Chhattisgarh 2684 2676 8 03 2684 2676 8 03
गरिजत Gujarat 10718 10718 0 00 10718 10718 0 00
मधय परिश Madhya Pradesh 6006 6006 0 00 6006 6006 0 00
महजिजषटर Maharashtra 14308 14308 0 00 14308 14308 0 00
िमन औि दिउ Daman amp Diu 220 220 0 00 220 220 0 00
िजिि व नगि हवली Dadra amp Nagar Haveli 552 552 0 00 552 552 0 00
गोवज Goa 388 388 0 00 388 388 0 00
पशचिमी कषतर Western Region 34875 34868 8 00 34875 34868 8 00
आनधर परिश Andhra Pradesh 5708 5708 0 00 5708 5708 0 00
तलगजनज Telangana 5725 5725 0 00 5725 5725 0 00
कनजाटक Karnataka 7003 7003 0 00 7003 7003 0 00
किल Kerala 2402 2400 2 01 2402 2400 2 01
तममल नजड Tamil Nadu 10010 10010 0 00 10010 10010 0 00
पडचिी Puducherry 263 263 0 00 263 263 0 00
लकष-दवीप Lakshadweep 4 4 0 0 4 4 0 0
दकषकषणी कषतर Southern Region 31111 31109 2 00 31111 31109 2 00
बबहजि Bihar 2589 2589 0 00 2589 2589 0 00
िजमोिि घजटी ननगम DVC 1772 1772 0 00 1772 1772 0 00
झजिखणड Jharkhand 689 689 0 00 689 689 0 00
ओडडशज Odisha 2689 2689 1 00 2689 2689 1 00
पशशचम बगजल West Bengal 5075 5075 0 00 5075 5075 0 00
मसशककम Sikkim 37 37 0 00 37 37 0 00
अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 7 29 27 2 7
परवी कषतर Eastern Region 12851 12850 1 00 12851 12850 1 00
अरणजचल परिश Arunachal Pradesh 66 66 0 05 66 66 0 05
असम Assam 766 709 57 75 766 709 57 75
मणणपि Manipur 68 67 1 15 68 67 1 15
मघजलय Meghalaya 170 160 10 59 170 160 10 59
ममज़ोिम Mizoram 54 53 0 08 54 53 0 08
नजगजलड Nagaland 54 54 0 08 54 54 0 08
बिपिज Tripura 122 120 1 12 122 120 1 12
उततर-परवी कषतर North-Eastern Region 1300 1228 71 55 1300 1228 71 55
समपणण भारत All India 110231 109842 389 04 110231 109842 389 04
23
ऊरजा पनत ा म कमी ऊरजा पनत ा म कमीEnergy not Supplied
Excludes energy exported to Bangladesh
Energy not Supplied
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
ऊराण वरवदयत आपरत ण शथिरत ररपोरण (परवाणरवलोकन) Energy Power Supply Position Report (Provisional)
राजयState
अपरल 2019 April2019 अपरल2019 -अपरल2019 April2019 to April2019
अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met
कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )
चडीगढ़ Chandigarh 256 256 0 00 256 256 0 00
दिलली Delhi 5664 5664 0 00 5664 5664 0 00
हरियजणज Haryana 8127 8127 0 00 8127 8127 0 00
दहमजचल परिश Himachal Pradesh 1387 1387 0 00 1387 1387 0 00
रमम कशमीि Jammu amp Kashmir 2826 2261 565 200 2826 2261 565 200
परजब Punjab 7015 7015 0 00 7015 7015 0 00
िजरसथजन Rajasthan 10560 10560 0 00 10560 10560 0 00
उतति परिश Uttar Pradesh 19935 19935 0 00 19935 19935 0 00
उततिजखड Uttarakhand 1922 1922 0 00 1922 1922 0 00
उततरी कषतर Northern Region 54476 53985 491 09 54476 53985 491 09
छततीसगढ़ Chhattisgarh 4596 4574 22 05 4596 4574 22 05
गरिजत Gujarat 17871 17865 6 00 17871 17865 6 00
मधय परिश Madhya Pradesh 10018 10018 0 00 10018 10018 0 00
महजिजषटर Maharashtra 23158 23150 8 00 23158 23150 8 00
िमन औि दिउ Daman amp Diu 341 340 1 02 341 340 1 02
िजिि व नगि हवली Dadra amp Nagar Haveli 818 818 0 00 818 818 0 00
गोवज Goa 594 594 0 00 594 594 0 00
पशचिमी कषतर Western Region 56242 56222 20 00 56242 56222 20 00
आनधर परिश Andhra Pradesh 9151 9151 0 00 9151 9151 0 00
तलगजनज Telangana 10191 10191 0 00 10191 10191 0 00
कनजाटक Karnataka 12681 12681 0 00 12681 12681 0 00
किल Kerala 4309 4300 8 02 4309 4300 8 02
तममल नजड Tamil Nadu 15972 15972 0 00 15972 15972 0 00
पडचिी Puducherry 482 480 2 05 482 480 2 05
लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0
दकषकषणी कषतर Southern Region 49155 49103 52 01 49155 49103 52 01
बबहजि Bihar 5357 5357 0 00 5357 5357 0 00
िजमोिि घजटी ननगम DVC 3039 3039 0 00 3039 3039 0 00
झजिखणड Jharkhand 1266 1266 0 00 1266 1266 0 00
ओडडशज Odisha 5389 5389 0 00 5389 5389 0 00
पशशचम बगजल West Bengal 8666 8666 0 00 8666 8666 0 00
मसशककम Sikkim 100 100 0 00 100 100 0 00
अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7
परवी कषतर Eastern Region 23349 23349 0 00 23349 23349 0 00
अरणजचल परिश Arunachal Pradesh 139 136 3 22 139 136 3 22
असम Assam 1712 1667 45 26 1712 1667 45 26
मणणपि Manipur 197 188 9 46 197 188 9 46
मघजलय Meghalaya 336 336 0 00 336 336 0 00
ममज़ोिम Mizoram 116 113 3 26 116 113 3 26
नजगजलड Nagaland 157 131 26 166 157 131 26 166
बिपिज Tripura 292 291 1 03 292 291 1 03
उततर-परवी कषतर North-Eastern Region 2848 2780 68 24 2848 2780 68 24
समपणण भारत All India 177411 176810 601 03 177411 176810 601 03
24
मजग की पनत ा म कमी Demand not Met
Excludes the supply to Bangladesh
राजयStateअपरल 2019 April2019
मजग की पनत ा म कमी Demand not Met
अधिकतम वरवदयत आपरत ण शथिरत ररपोरण (परवाणरवलोकन) Peak Power Supply Position Report (Provisional)
आकड़ मगज वजट नट Figures in MW netअपरल2019 -अपरल2019 April2019 to April2019
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
आकड़ मममलयन यननट नट Figures in MU net
ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied
कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )
चडीगढ़ Chandigarh 96 96 0 00 1561 1561 0 00
दिलली Delhi 1931 1930 1 00 32299 32282 17 01
हरियजणज Haryana 3658 3658 0 00 53665 53665 0 00
दहमजचल परिश Himachal Pradesh 832 830 2 02 9850 9618 232 24
रमम कशमीि Jammu amp Kashmir 1767 1414 353 200 19593 15868 3725 190
परजब Punjab 3585 3585 0 00 55288 55275 13 00
िजरसथजन Rajasthan 6774 6770 4 01 79826 79637 189 02
उतति परिश Uttar Pradesh 8754 8691 63 07 117101 116118 984 08
उततिजखड Uttarakhand 1067 1067 0 00 13845 13753 92 07
उततरी कषतर Northern Region 28464 28041 423 15 383028 377776 5251 14
छततीसगढ़ Chhattisgarh 2464 2457 8 03 26130 26076 54 02
गरिजत Gujarat 9890 9890 0 00 116588 116572 15 00
मधय परिश Madhya Pradesh 6236 6236 0 00 75667 75665 2 00
महजिजषटर Maharashtra 13631 13631 0 00 158285 158148 137 01
िमन औि दिउ Daman amp Diu 221 221 0 00 2557 2557 0 00
िजिि व नगि हवली Dadra amp Nagar Haveli 553 553 0 00 6317 6317 0 00
गोवज Goa 362 362 0 00 4283 4280 3 01
पशचिमी कषतर Western Region 33357 33349 8 00 389827 389615 212 01
आनधर परिश Andhra Pradesh 6072 6071 1 00 63735 63677 58 01
तलगजनज Telangana 6930 6929 1 00 66697 66635 62 01
कनजाटक Karnataka 7614 7612 1 00 71759 71690 69 01
किल Kerala 2489 2488 1 00 25029 24911 118 05
तममल नजड Tamil Nadu 10247 10245 2 00 109375 109273 102 01
पडचिी Puducherry 252 251 1 04 2761 2751 10 03
लकष-दवीप Lakshadweep 4 4 0 0 46 46 0 0
दकषकषणी कषतर Southern Region 33605 33597 8 00 339355 338938 417 01
बबहजि Bihar 2319 2318 1 00 30052 29827 225 07
िजमोिि घजटी ननगम DVC 1773 1772 1 00 22365 21995 369 17
झजिखणड Jharkhand 698 697 1 01 8682 8461 221 25
ओडडशज Odisha 2583 2582 1 00 31810 31781 30 01
पशशचम बगजल West Bengal 4585 4584 2 00 52237 52078 159 03
मसशककम Sikkim 41 41 0 00 513 512 0 01
अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 67 346 323 23 67
परवी कषतर Eastern Region 11999 11995 5 00 145658 144654 1004 07
अरणजचल परिश Arunachal Pradesh 61 60 0 06 864 855 9 10
असम Assam 680 656 23 34 9532 9204 328 34
मणणपि Manipur 68 68 1 09 916 906 10 11
मघजलय Meghalaya 173 173 0 03 1955 1953 1 01
ममज़ोिम Mizoram 50 49 0 09 668 661 8 12
नजगजलड Nagaland 58 57 1 20 902 809 93 103
बिपिज Tripura 150 150 0 00 1859 1837 21 11
उततर-परवी कषतर North-Eastern Region 1240 1214 26 21 16696 16225 471 28
समपणण भारत All India 108665 108196 469 04 1274564 1267209 7355 06
Note The revised data for March 2019 is not avaliable
Excludes energy exported to Bangladesh
राजयState
ऊराण वरवदयत आपरत ण शथिरत ररपोरण (परवाणरवलोकन) Energy Power Supply Position Report (Provisional)
25
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
Energy not Supplied Energy not Supplied
मािण2019 March2019 अपरल2018 -मािण2019 April2018 to March2019
ऊरजा पनत ा म कमी ऊरजा पनत ा म कमी
अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met
कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )
चडीगढ़ Chandigarh 223 223 0 00 369 369 0 00
दिलली Delhi 4016 4016 0 00 7016 7016 0 00
हरियजणज Haryana 6544 6544 0 00 10270 10270 0 00
दहमजचल परिश Himachal Pradesh 1683 1683 0 00 1700 1700 0 00
रमम कशमीि Jammu amp Kashmir 3277 2622 655 200 3277 2622 655 200
परजब Punjab 6564 6564 0 00 12638 12638 0 00
िजरसथजन Rajasthan 11885 11885 0 00 13276 13276 0 00
उतति परिश Uttar Pradesh 16220 16220 0 00 20498 20062 436 21
उततिजखड Uttarakhand 2002 2002 0 00 2216 2216 0 00
उततरी कषतर Northern Region 47925 47356 569 12 63166 61726 1440 23
छततीसगढ़ Chhattisgarh 4444 4128 316 71 4444 4270 174 39
गरिजत Gujarat 16263 16263 0 00 17053 16963 90 05
मधय परिश Madhya Pradesh 12328 12323 5 00 13815 13815 0 00
महजिजषटर Maharashtra 22361 22291 70 03 23864 23254 610 26
िमन औि दिउ Daman amp Diu 336 336 0 01 357 356 1 02
िजिि व नगि हवली Dadra amp Nagar Haveli 800 799 1 01 816 815 1 01
गोवज Goa 538 538 0 00 596 596 0 00
पशचिमी कषतर Western Region 53132 52965 167 03 56675 55821 853 15
आनधर परिश Andhra Pradesh 8977 8977 0 00 9459 9453 6 01
तलगजनज Telangana 10471 10471 0 00 10815 10815 0 00
कनजाटक Karnataka 12841 12841 0 00 12841 12841 0 00
किल Kerala 4264 4228 36 09 4264 4228 36 09
तममल नजड Tamil Nadu 15712 15712 0 00 15712 15712 0 00
पडचिी Puducherry 427 412 15 34 427 412 15 34
लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0
दकषकषणी कषतर Southern Region 49464 49464 0 00 49464 49464 0 00
बबहजि Bihar 4633 4633 0 00 5115 5084 31 06
िजमोिि घजटी ननगम DVC 3035 3035 0 00 3035 3035 0 00
झजिखणड Jharkhand 1210 1210 0 00 1339 1291 48 36
ओडडशज Odisha 4827 4827 0 00 5357 5357 0 00
पशशचम बगजल West Bengal 8287 8287 0 00 9130 9123 7 01
मसशककम Sikkim 100 100 0 00 106 106 0 00
अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7
परवी कषतर Eastern Region 21658 21658 0 00 23141 22733 408 18
अरणजचल परिश Arunachal Pradesh 133 131 2 15 138 138 0 01
असम Assam 1539 1508 31 20 1865 1809 56 30
मणणपि Manipur 204 199 5 25 219 216 3 12
मघजलय Meghalaya 357 357 0 00 374 372 1 04
ममज़ोिम Mizoram 108 105 3 28 121 119 2 17
नजगजलड Nagaland 127 125 2 16 156 138 18 116
बिपिज Tripura 249 249 0 00 298 293 5 17
उततर-परवी कषतर North-Eastern Region 2540 2535 5 02 2967 2850 117 39
समपणण भारत All India 169464 168745 719 04 177022 175528 1494 08
Note The revised data for March 2019 is not avaliable 26
अधिकतम वरवदयत आपरत ण शथिरत ररपोरण (परवाणरवलोकन) Peak Power Supply Position Report (Provisional)
आकड़ मगज वजट नट Figures in MW net
राजयStateमािण2019 March2019 अपरल2018 -मािण2019 April2018 to March2019
मजग की पनत ा म कमी मजग की पनत ा म कमी Demand not MetDemand not Met
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
Excludes the supply to Bangladesh
अपरल 2019 April2019 अपरल2018 -मािण2019 April2019 to April2019
उततरी कषतर Northern Region
चडीगढ़ Chandigarh(Data Not Received)दिलली Delhi
हरियजणज Haryana
दहमजचल परिश Himachal Pradeshरमम कशमीि Jammu amp Kashmir(Data
Not Received)परजब Punjab
िजरसथजन Rajasthanउतति परिश Uttar Pradesh
उततिजखड Uttarakhand
पशचिमी कषतर Western Region
छततीसगढ़ Chhattisgarh
Apr-Nov 2018- No cuts
Maximum Demand cut-58MW
Energy cut- 00020-00032 MUsday
गरिजत Gujarat
मधय परिश Madhya Pradesh
महजिजषटर Maharashtra
गोवज Goa
दकषकषणी कषतर Southern Region
आनधर परिश Andhra Pradesh
तलगजनज Telangana
कनजाटक Karnataka
किल Kerala
तममल नजड Tamil Nadu
पडचिी Puducherryपरवी कषतर Eastern Region
बबहजि Bihar
झजिखणड Jharkhand
ओडडशज Odisha
पशशचम बगजल West Bengal
No N
otifie
d Cu
ts
27
मािण 2019 म इडथरीर पर वरवदयत करौती का वरवरवरण Notified Power CutsRestrictions on Industries during April2019
राजय कषतर State Regionऊराणमाग करौती EnergyDemand Cut
No N
otifie
d Cu
tsNo
Notifie
d Cu
ts
अपरल2019 April 2019 अपरल2019 -अपरल2019 April2019 to April2019
उततरी कषतर Northern Region
चडीगढ़ Chandigarh Data not received Data not received
दिलली Delhi Data not received Data not received
हरियजणज Haryana 0811 hrsday 0811 hrsday
दहमजचल परिश Himachal Pradesh HPSEBL has only 2 agriculture consumers and uninterrupted
power is being supplied to agriculture sector
HPSEBL has only 2 agriculture consumers and uninterrupted
power is being supplied to agriculture sector
रमम कशमीि Jammu amp Kashmir Data not received Data not received
परजब Punjab 379 hrsday 379 hrsday
िजरसथजन Rajasthan 0630 hrsday 0630 hrsday
उतति परिश Uttar Pradesh 2157 hrsday 2157 hrsday
उततिजखड Uttarakhand 2359 hrsday 2359 hrsday
पशचिमी कषतर Western Region
छततीसगढ़ Chhattisgarh 18 hrsday 18 hrsday
गरिजत Gujarat 8 hrsday 8 hrsday
मधय परिश Madhya Pradesh Three-Phase Supply(Irrigation)- 0953 hrs day Three-Phase
(Mixed) Supply - 2334 hrs day
Three-Phase Supply(Irrigation)- 0953 hrs day Three-Phase
(Mixed) Supply - 2334 hrs day
महजिजषटर Maharashtra Three-Phase Supply(Irrigation)- 9 hrs day Three-Phase Supply(Irrigation)- 9 hrs day
गोवज Goa No restriction No restriction
दकषकषणी कषतर Southern Region
आनधर परिश Andhra Pradesh 07 hrsday 07 hrsday
तलगजनज Telangana 24 hrsday 24 hrsday
कनजाटक Karnataka 6 hrsday 6 hrsday
किल Kerala No Restrictions No Restrictions
तममल नजड Tamil Nadu 9 hrsday (6 hrs during day time and 3 hrs during night time) 9 hrsday (6 hrs during day time and 3 hrs during night time)
पडचिी Puducherry No Restrictions No Restrictions
परवी कषतर Eastern Region
बबहजि Bihar 18 hrsday 18 hrsday
झजिखणड Jharkhand 20 hrsday 20 hrsday
ओडडशज Odisha 24 hrsday 24 hrsday
पशशचम बगजल West Bengal 23 hrsday 23 hrsday
28
मारच 2019 कषि कषतर को षिदयत आपरतच का षििरण Power Supply to Agricultural Sector during March2019
राजय कषतर State Regionऔसत वरवदयत आपरत ण घनरो म Average Hours of Supply
On segregated feeders
SNo Contents Page
1 Growth of Installed Capacity since 6th Plan 29
2 Progress of Transmission Sector since 6th Plan 30
3 All India Yearly Coal consumption for Power Generation (Utilities)
4 All India Annual Per Capita Consumption of Electricity since -2006
5 Average cost of power supply amp Average realisation (Paisakwh)
6 Growth of Rural Electrification amp Pump Sets Energisation
7 Status of Hydro Schemes Cleared by the CEA in Apr-2019
Section G - Growth of Power Sector
31
32
(In MW)
Coal Gas Diesel Total
End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472
End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634
End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537
End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596
End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921
End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703
End of 12th Plan 19216288 2532938 83763 21832988 6780 4447842 50018 31960630
Up to Apr-2019 20070450 2493722 63763 22627934 678000 4539922 7764163 35610019
Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-17) = 51529 MW
Electricity Generation (MU) Targets and Achievements for 2016-17
Coal Gas Diesel Nuclear Hydro Res Total
2007045 2493722 637629 678000 453992 77641625 22925174
29
1 Growth of Installed Capacity Since 6th Plan
Plan YearThermal
Nuclear Hydro RES (MNRE) Total
2007045
2493722637629
678000
4539922
77641625
Total Installed Capacity 35610019 MW
Coal Gas Diesel Nuclear Hydro Res
Progress of Transmission Sector in the Country up to April 2019
1 TRANSMISSION LINES (All fig in CKM)
At the end of
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
6th plan 0 0 0 0 0 0 0 0 0 0 0 0 1831 4198 0 6029 1641 44364 0 46005 3472 48562 0 52034
7th plan 0 0 0 0 0 0 0 0 0 0 0 0 13068 6756 0 19824 4560 55071 0 59631 17628 61827 0 79455
8th plan 0 0 0 0 1634 0 0 1634 0 0 0 0 23001 13141 0 36142 6564 73036 0 79600 31199 86177 0 117376
9th plan 0 0 0 0 3234 1504 0 4738 751 409 0 1160 29345 20033 0 49378 8687 88306 0 96993 42017 110252 0 152269
10th plan 0 0 0 0 4368 1504 0 5872 1775 409 0 2184 48708 24730 0 73438 9444 105185 0 114629 64295 131828 0 196123
11th Plan 0 0 0 0 5948 1504 1980 9432 4839 411 0 5250 71023 30191 5605 106819 10140 125010 830 135980 91950 157116 8415 257481
12th Plan 6124 0 0 6124 5948 1504 1980 9432 25465 1177 4598 31240 92482 48240 17065 157787 11014 151276 978 163268 141033 202197 24621 367851
13th Plan (Up
to Mar2019)6124 0 0 6124 5948 1504 1980 9432 33692 1512 6605 41809 101335 58238 21173 180746 11734 162552 1010 175296 158833 223806 30768 413407
13th Plan (Up
to Apr-19)6124 0 0 6124 5948 1504 1980 9432 33745 1512 6605 41862 101335 58258 21173 180766 11734 162953 1010 175697 158886 224227 30768 413881
27150 600 MW of 132 kV Inter-Regional power transmission capacity links which are operated radially from time to time is not added in the total
75050
47900
24000
99050
30
Grand Total
Note - The figure upto the end of 10th plan in for stringing progress including the lines not commissioned Now only commissioned lines are reckoned Accordingly the figure for 10th plan (end) may read
as 187555 after adjusting with (-) 10852 Ckm
Inter-regional Power Transfer Capacity (MW)
plusmn 800 kV HVDC plusmn 500 kV HVDC 765 kV 400 kV 220 kV
IR addition in 12th
Plan (up to March
2017)
Inter-regional
Transmission
Capacity at the end
of Plan Period 2017-
22 (as on April19)
IR at the end of 11th
PlanIR at the end of 12th
Plan
IR Capacity Addition
at the end of Plan
Period 2017-22 (Till
April 19)
2004-05 27800
2005-06 28100
2006-07 30200
2007-08 33000
2008-09 35500
2009-10 36700
2010-11 38700
2011-12 41756
2012-13 45460
2013-14 48940
2014-15 53040
2015-16 54590
2016-17 57430
2017-18 60800
2018-19 62890
Year
2005-06
2006-07
2007-08
2008-09
2009-10
2010-11
2011-12
2012-13
2013-14
2014-15
2015-16
2016-17
2017-18
2018-19
2004-05 254 209 7568
2005-06 260 221 7636
2006-07 276 227 7423
2007-08 293 239 7727
2008-09 340 263 8713
2009-10 355 268 8870
2010-11 398 303 11975
2011-12 455 330 13514
2012-13 501 376 14867
2013-14 518 175
2014-15 520
Source- PFC Reports on the performance of State Power Utilities 31
1181
7335
7786
91441
8188
88363
957
1010
1075
1122
1149
(GrossGen+ Net Import) Mid-year population Provisional
5 Average cost of power supply amp average realization ( paiseKWH )
Yearcost of supply
(paiseunit)
Realization(paiseunit)
Including AgricultureOnly
Agriculture
6719
7171
3 All India yearly Coal Consumption for Power Generation (Utilities)
YEARCoal Consumption
Million Tonnes
4 All India Annual per Capita consumption of Electricity Since 2006
Per Capita Consumption ( kWh)
6314
Sl
NoExecuting Agency
Installed
Capacity (MW)Cost (Rs crore)
Date of
Clearance
32
Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as
Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received
from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made
available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified
villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is
independent of the earlier published reports
No Hydro Electric Project has been issued concurrenceAppraisal letter by CEA during April 2019
7 Status of Hydro Schemes Cleared by the CEA in Apr-2019
Name of Scheme
1999-002000-01
297594
010408 to 310309010409 to 310310
10th Plan
2005-062006-07
322968331020
6 Growth Of Rural Electrification amp Pumpsets Energisation
Plan Year
9th Plan2002-03
134092626
4111
Pump Sets Energised Villages Electricfied (Nos)
2001-02
284064367244
1218
27801997-981998-99
3207
482864
12632
1576036
4451722594
15455554
2314176
397343611750
2093311060316074
65109527813884
46708
18423975
499150
2003-042004-05
5743
9769
Cumu upto End of 10th Plan
010407 to 310308
010410 to 310311557976840909
010411 to 310312
412667
86293726
No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification
since 2004-05
65291374575 296361511th Plan
Cumu upto End of 11th Plan
596556 21212860
557439Cummulative up to end of 12th Plan
SN Contents Page
1 Rate of sale of power for the year 2016-17 33-41
RATE OF SALE OF POWER FOR THE YEAR 2016-17
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) NORTHERN REGION
CENTRAL SECTOR
BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 18000 66900 19800
CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 54000 222400 21600
CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 30000 144400 19600
CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 23100 91700 42600
PARBATI - III HPS NHPC LTD HYDRO-HYDRO 52000 68200 54800
DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 28000 95600 30000
CHUTAK NHPC LTD HYDRO-HYDRO 4400 22000 79800
DULHASTI HPS NHPC LTD HYDRO-HYDRO 39000 228000 56400
SALAL HPS NHPC LTD HYDRO-HYDRO 69000 342300 11000
TANAKPUR HPS NHPC LTD HYDRO-HYDRO 9420 43000 29600
URI HPS -I NHPC LTD HYDRO-HYDRO 48000 280300 16000
URI HPS - II NHPC LTD HYDRO-HYDRO 24000 147300 48600
NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 4500 24600 88200
SEWA - II NHPC LTD HYDRO-HYDRO 12000 47100 43400
ANTA CCPP NTPC LTD THERMAL-GASN 41930 67539 32400
AURAIYA CCPP NTPC LTD THERMAL-GASN 66336 53501 39100
BADARPUR TPS NTPC LTD THERMAL-COAL 70500 159153 44800
DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 84000 296170 42300
DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 98000 526686 46300
DADRI CCPP NTPC LTD THERMAL-GASHSD 82978 227469 33000
FARIDABAD CCPP NTPC LTD THERMAL-GASN 43159 115577 30800
RIHAND STPS I NTPC LTD THERMAL-COAL 100000 596766 24500
RIHAND STPS II NTPC LTD THERMAL-COAL 100000 737069 24600
RIHAND STPS III NTPC LTD THERMAL-COAL 100000 706546 30600
SINGRAULI STPS NTPC LTD THERMAL-COAL 200000 1394068 20400
TANDA TPS NTPC LTD THERMAL-COAL 44000 295438 40800
UNCHAHAR TPS I NTPC LTD THERMAL-COAL 42000 256454 39800
UNCHAHAR TPS II NTPC LTD THERMAL-COAL 42000 273577 38900
UNCHAHAR TPS III NTPC LTD THERMAL-COAL 21000 142780 43000
KOLDAM NTPC LTD HYDRO-HYDRO 80000 363260 43600
NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 303575 25841
RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 108000 668677 35374
NJHPS SJVNL HYDRO-HYDRO 150000 699496 23820
RAMPUR HPS SJVNL HYDRO-HYDRO 41202 195982 32260
TEHRI HPP THDC HYDRO-HYDRO 100000 272543 51800
KOTESHWAR HEP THDC HYDRO-HYDRO 40000 106244 53400
IGSTPS JHAJJAR ARAVALI P CPL THERMAL-COAL 150000 510429 49490
NEYVELI BARSINGSAR NEYVELI LIG CORP LTD THERMAL-LIG 25000 127520 38040
STATE SECTOR
PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 21000 14222 48200
PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 21000 19205 48400
PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 25000 102257 42600
PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 25000 62107 41800
DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 60000 312213 41000
RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 120000 35767442200
WYC HYDEL STATION HPGCL HYDRO-HYDRO 6240 20365 24900
GIRI POWER HOUSE HPSEB HYDRO-HYDRO 6000 13958 7600
ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 1695 5467 11900
BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 12000 18528 6700
GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 2250 7462 22500
BASSI POWER HOUSE HPSEB HYDRO-HYDRO 6600 29649 7500
BINWA POWER HOUSE HPSEB HYDRO-HYDRO 600 2749 19300
ANNEXURE-I
RATE OF SALE OF POWER FOR THE YEAR 2016-2017
Page 33
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) GAJ POWER HOUSE HPSEB HYDRO-HYDRO 1050 2914 26700
BANER POWER HOUSE HPSEB HYDRO-HYDRO 1200 2864 16200
HOLI POWER HOUSE HPSEB HYDRO-HYDRO 300 616 22500
THIROT POWER HOUSE HPSEB HYDRO-HYDRO 450 1126 22500
KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 1200 3064 22500
LARJI POWER HOUSE HPSEB HYDRO-HYDRO 12600 53677 23700
NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 250 750 31000
CHABA POWER HOUSE HPSEB HYDRO-HYDRO 175 465 23300
RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 150 101 13400
SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 200 000 22500
KILLAR HPSEB HYDRO-HYDRO 030 050 22500
BHABA AUGUMENP H HPSEB HYDRO-HYDRO 450 1276 22500
BS CHAMBA HPSEB HYDRO-HYDRO 045 099 19500
GUMMA HPSEB HYDRO-HYDRO 300 423 22500
GAS TURBINE POWER STATION IPGCL THERMAL-GAS 27000 67233 39300
PPS-I PPCL THERMAL-GAS 33000 175905 38300
PPS-III PPCL THERMAL-GAS 137120 196879 36100
LOWER JHELUM JampKPDD HYDRO-HYDRO 10500 60214 5100
UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 2260 10514 6300
UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 10500 44202 8500
GANDHARBAL JampKPDD HYDRO-HYDRO 1500 8925 4700
KARNAH MPH JampKPDD HYDRO-HYDRO 200 1122 31000
CHENANI I JampKPDD HYDRO-HYDRO 2330 10892 6600
CHENANI II JampKPDD HYDRO-HYDRO 200 1188 9300
CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 750 3634 14200
IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 375 2108 18500
IGO MERCHELLONG JampKPDD HYDRO-HYDRO 300 1572 29700
PAHALGAM MHP JampKPDD HYDRO-HYDRO 450 1713 32900
MARPACHOO JampKPDD HYDRO-HYDRO 075 375 29800
HAFTAL JampKPDD HYDRO-HYDRO 100 483 28700
SANJAK JampKPDD HYDRO-HYDRO 126 441 36000
SEWA-III JampKPDD HYDRO-HYDRO 900 3273 20200
BHADERWAH JampKPDD HYDRO-HYDRO 150 935 8900
BAZGO JampKPDD HYDRO-HYDRO 030 108 33300
SUMOOR JampKPDD HYDRO-HYDRO 010 045 35400
HUNDER JampKPDD HYDRO-HYDRO 040 176 26200
STAKNA JampKPDD HYDRO-HYDRO 400 1933 4100
KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 124000 662879 31360
SURATGARH TPS RRVUNL THERMAL-COAL 150000 402328 41730
CHHABRA TPS 1amp 2 RRVUNL THERMAL-COAL 50000 305946 36700
CHHABRA TPS 3 RRVUNL THERMAL-COAL 25000 151536 36700
CHHABRA TPS 4 RRVUNL THERMAL-COAL 25000 155896 36700
RAMGARH GT POWER PROJECT RRVUNL THERMAL-COAL 22050 43177 41800
RAMGARH GAS T P PROJECT 3 RRVUNL THERMAL-GAS 5000 93615 41800
DHOLPUR C C POWER PROJECT RRVUNL THERMAL-R-LNG 33000 9486 46110
MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 14000 20855 34192
MINI MICRO HYDEL (MMH) P S RRVUNL HYDRO-HYDRO 2385 851 37800
KALISINDH TPP 1 RRVUNL THERMAL-COAL 60000 341543 45000
KALISINDH TPP 2 RRVUNL THERMAL-COAL 60000 211588 45000
KHARA HEP UPJVNL HYDRO-HYDRO 7200 26654 7200
MATATILLA HEP UPJVNL HYDRO-HYDRO 3060 12219 6500
OBRA HEP UPJVNL HYDRO-HYDRO 9900 21517 6300
RIHAND UPJVNL HYDRO-HYDRO 30000 57369 5500
ANPARA A TPS UPRVUNL THERMAL-COAL 63000 317536 27000
ANPARA B TPS UPRVUNL THERMAL-COAL 100000 705605 22700
ANPARA D UPRVUNL THERMAL-COAL 100000 300158 39800
HARDUAGANJ TPS UPRVUNL THERMAL-COAL 16500 45817 49200
HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 50000 304389 46600
OBRA A TPS UPRVUNL THERMAL-COAL 28800 13158 34000
OBRA B TPS UPRVUNL THERMAL-COAL 100000 328124 21900
Page 34
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) PANKI TPS UPRVUNL THERMAL-COAL 21000 66488 50300
PARICHHA TPS UPRVUNL THERMAL-COAL 22000 38762 49400
PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 42000 231931 45600
PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 50000 276722 50400
CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 24000 70845 8290
CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 14400 75366 8390
DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 3375 9595 12080
DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 5100 18701 10520
KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4140 17359 12330
KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 12000 33001 9420
KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 3000 11953 8320
TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 9000 33983 12460
MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 30400 124510 16110
RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 19800 17897 10550
MPUR UTTARAKHAND JVNL HYDRO-HYDRO 930 5121 19200
PATHRI UTTARAKHAND JVNL HYDRO-HYDRO 2040 11636 14200
GALOGI UTTARAKHAND JVNL HYDRO-HYDRO 300 648 12500
PRIVATE SECTOR
MGTPP CLP INDIA PVT LTD THERMAL-COAL 132000 268902 41940
SHRINAGAR HEP ALAKNANDA HPCL HYDRO-HYDRO 33000 127414 48800
GAMA INFRAPROP CCPP GAMA INFRAPROP PVT THERMAL-GAS 22500 52686 47000
PPGCL (BARA) JP POWER VENTURES LTD THERMAL-COAL 198000 448200 38500
MALANA HEP MALANA PCL HYDRO-HYDRO 8600 26354 29792
MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 10000 30369 32580
ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 19200 56347 36079
KASHANG HEP H P PCL HYDRO-HYDRO 19500 5034 29200
BASPA-II HEP HBPCL HYDRO-HYDRO 30000 132769 13600
KARCHAM WANGTOO HEP HBPCL HYDRO-HYDRO 100000 434386 36600
RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 108000 582600 43700
RITHALA COMBI CY POWER PLANT TATA POWER DDL THERMAL-GAS 9480 000 11900
RAJPURA TPS NABHA POWER LTD THERMAL-GAS 140000 901484 39000
TALWANDI SABO POWER LTD TALWANDI SABO POWER LTD THERMAL-COAL 198000 636040 49548
ROJA THERMAL POWER STATION ROJA POWER SCL THERMAL-COAL 120000 727200 43400
KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 34400 63400
BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 36000 62600
MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 38200 60800
UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 37900 61500
KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 42300 58800
LALITPUR PGCL BAJAJ ENERGY PVT LTD THERMAL-COAL 198000 359400 47300
PRAYAGRAJ PGCL PRAYAGRAJ PGCL THERMAL-COAL 132000 448200 38595
KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 132000 783182 33438
WESTERN REGION
CENTRAL SECTOR
INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 100000 325333 23892
OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 52000 141663 34001
GANDHAR CCPP NTPC LTD THERMAL-GAS 65739 221924 28700
KAWAS CCPP NTPC LTD THERMAL-GASN 65620 167929 27000
KORBA I amp II NTPC LTD THERMAL-COAL 210000 1499171 20500
KORBA III NTPC LTD THERMAL-COAL 50000 358746 26600
SIPAT STPS I NTPC LTD THERMAL-COAL 198000 1479902 26800
SIPAT STPS II NTPC LTD THERMAL-COAL 100000 766549 26500
VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 126000 693142 25800
VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 100000 608781 23800
VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 100000 673475 27600
VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 100000 655924 32900
VINDHYACHAL STPS V NTPC LTD THERMAL-COAL 50000 328265 31700
MOUDA I NTPC LTD THERMAL-COAL 100000 343130 44500
MOUDA Ii NTPC LTD THERMAL-COAL 66000 40637 39900
RATNAGIRI GAS amp POWER PVT LTD RGPPL THERMAL-GAS 196708 442485 47000
KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 000 24729
TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 32000 201227 10740
Page 35
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 365122 19069
TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 787444 29324
STATE SECTOR
GSEG-HAZIRA15610 MW GUJARAT S ENEGEN LTD THERMAL-GAS 15610 1805 28200
GSEG-HAZIRA35143 MW GUJARAT S ENEGEN LTD THERMAL-GAS 35130 22276 51300
GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 21978 51800
AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 13929 26100
KORBA TPS EAST CSPGCL THERMAL-COAL 44000 198673 33880
DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 365808 27570
KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 316500 30420
HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 532878 19410
CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 515 58300
MTTPS CHAMPA U-I CSPGCL THERMAL-COAL 50000 220376 39000
MTTPS CHAMPA U-II CSPGCL THERMAL-COAL 50000 23709 10000
SHP GANGREL CSPGCL HYDRO-HYDRO 1000 2350 36790
BANGO HEP CSPGCL HYDRO-HYDRO 12000 14662 8900
MHP KORBA WEST CSPGCL HYDRO-HYDRO 170 859 38190
SIKASAR HEP CSPGCL HYDRO-HYDRO 700 418 26870
DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8843 74500
DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 19446 51500
GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 66388 71600
GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127488 41300
KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 96072 43900
KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 29841 56400
SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 184966 58800
UKAI 1-5 GSECL THERMAL-COAL 85000 204891 46900
UKAI TPS 6 GSECL THERMAL-COAL 50000 284448 48200
WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 271999 58300
WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 82808 44100
KADANA HPS GSECL HYDRO-HYDRO 24200 34433 16800
UKAI HPS GSECL HYDRO-HYDRO 30500 40585 6100
TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 123000 11500
BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 8900 10900
BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 7200 27500
JHINNA HPS MPPGCL HYDRO-HYDRO 2000 9700 18500
RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 44300 3400
GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 17300 4600
SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 4100 16900
MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 14600 27000
PENCH HPS MPPGCL HYDRO-HYDRO 16000 23700 8100
RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 3000 16900
AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 134400 35100
SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 283800 38700
SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 344600 34300
SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 111600 61600
SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 211800 58000
SSTPS PH-I MPPGCL THERMAL-COAL 120000 233100 84300
BHUSAWAL TPS MSPGCL THERMAL-COAL 142000 566258 51100
CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1365682 33700
KHAPERKHEDA MSPGCL THERMAL-COAL 134000 706207 39100
KORADI TPS MSPGCL THERMAL-COAL 62000 443206 42000
NASIK TPS MSPGCL THERMAL-COAL 63000 297275 47000
PARLI TPS MSPGCL THERMAL-COAL 113000 175934 71600
PARAS MSPGCL THERMAL-COAL 50000 267931 38700
URAN CCPP MSPGCL THERMAL-GAS 67200 320330 30600
KOYANA MSPGCL HYDRO-HYDRO 195600 328155 13100
SMALL HYDRO POWER PLANTS MSPGCL HYDRO-HYDRO 45400 93062 30500
BHIRA MSPGCL HYDRO-HYDRO 8000 10046 8400
TILLARI MSPGCL HYDRO-HYDRO 8900 10584 3100
SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 233298 20500
SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 87633 20500
PRIVATE SECTOR
Page 36
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 81282 46750
JNSTPP(JAYPEE NIGRIE) JP POWER VENTURES LTD THERMAL-COAL 132000 726695 29310
MB POWER MB POWER THERMAL-COAL 120000 345632 38310
ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 754922 28671
ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 780761 23495
ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 198000 1263784 32090
ADANI POWER MAHARA ADANI POWER LTD THERMAL-COAL 330000 1666191 34124
AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 170065 36827
SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 252035 45129
ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 458551 36000
ESSAR POWER MP LTD ESSAR POWER MP LTD THERMAL-COAL 60000 243040 28600
VEDANTA LTD (P P -I) VEDANTA LTD THERMAL-GAS 3000 15044 24000
VEDANTA LTD (P P -II) VEDANTA LTD THERMAL-GAS 3000 21293 24000
PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 8234600 24000
165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 5850 64390
145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 68717 40349
SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 132655 28776
SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 144686 38567
MUNDRA UMPPCOASTAL GUJARAT POWER
LTD THERMAL-IMP COAL 400000 2530300
23900
LANCO AMARKANTAK TPP PATHADIH
U-ILANCO AMARKAN POWER LTD THERMAL-COAL 30000 195500
29200
LANCO AMARKANTAK TPP PATHADIH
U-IILANCO AMARKAN POWER LTD THERMAL-COAL 30000 206900
27600
BARADARHA TPS D B POWER LTD THERMAL-COAL 120000 677373 29200
JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 405000 28900
JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 453000 40500
DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 339437 40700
TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 293400 44000
TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 137200 37000
TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 174900 44000
BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 92900 14100
BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23700 34300
KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 27600 48300
CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2530300 23900
BHANDARDRA HEP -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 2475 54900
SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 161400 26500
SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 445000 39000
SOTHERN REGION
CENTRAL SECTOR
NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 325699 54820
NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 305532 39880
NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 998805 38510
NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 113016 54070
NEYVELI TAMILNADU POWER LTD JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 625274 42200
VALLUR TPS NTPC TECL THERMAL-COAL 150000 856438 42350
R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 1493 84300
RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1502919 29400
RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 341291 31800
SIMHADRI I NTPC LTD THERMAL-COAL 100000 688382 36800
SIMHADRI II NTPC LTD THERMAL-COAL 100000 663657 43400
KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 593110 31324
MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 291625 21764
KKNPP-1 amp 2 NPCIL NUCLEAR-NUCLEAR 200000 572609 40948
MINICOY LAKSHADEEP THERMAL-DIESEL 340 770 29600
KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1097 29600
AMINI LAKSHADEEP THERMAL-DIESEL 265 509 29600
ANDROTT LAKSHADEEP THERMAL-DIESEL 219 524 29600
KALPENI LAKSHADEEP THERMAL-DIESEL 175 356 29600
AGATTI LAKSHADEEP THERMAL-DIESEL 195 658 29600
KADMAT LAKSHADEEP THERMAL-DIESEL 190 414 29600
KILTAN LAKSHADEEP THERMAL-DIESEL 150 269 29600
CHETLET LAKSHADEEP THERMAL-DIESEL 100 139 29600
BITRA LAKSHADEEP THERMAL-DIESEL 043 024 29600
BANGARAM LAKSHADEEP THERMAL-DIESEL 018 009 29600
Page 37
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) STATE SECTOR
Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 721811 46500
Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 50000 336142 46500
RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 237358 46500
RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 239926 46500
RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 124500 46500
SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 62109 46500
UPPER SILERU APGENCO HYDRO-HYDRO 24000 33000 46500
LOWER SILERU APGENCO HYDRO-HYDRO 46000 81066 46500
DONKARAI APGENCO HYDRO-HYDRO 2500 6007 46500
PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 1262 46500
CHETTIPETA APGENCO HYDRO-HYDRO 100 214 46500
MUCHKUND APGENCO HYDRO-HYDRO 12000 37571 46500
NAGARJUNASAGAR RCPH APGENCO HYDRO-HYDRO 9000 606 46500
TUNGABHADRA HES amp HAMPI(AP
Share)
APGENCO HYDRO-HYDRO 7200 6100 46500
KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 352232 42600
KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 288131 32500
KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 319272 46500
RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 40073 44300
KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 308317 46000
KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 308963 51300
SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 61004 76600
NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 17960 75300
PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 20873 58300
POCHAMPAD-I TSPGENCO HYDRO-HYDRO 2700 5455 29800
POCHAMPAD-II TSPGENCO HYDRO-HYDRO 900 1932 40700
NIZAMSAGAR TSPGENCO HYDRO-HYDRO 1000 1126 53400
RAICHUR TPS 1 to 7 KPCL THERMAL-COAL 147000 890866 43800
RAICHUR TPS 8 KPCL THERMAL-COAL 25000 159523 48200
BELLARI TPS 1 KPCL THERMAL-COAL 50000 318679 51100
BELLARI TPS 2 KPCL THERMAL-COAL 50000 232347 55600
BELLARI TPS 3 KPCL THERMAL-COAL 70000 47565 34400
BHADRA PH KPCL HYDRO-HYDRO 3920 2369 45900
GERUSUPPA PH KPCL HYDRO-HYDRO 24000 26990 22000
GHAT PRABHA HEP KPCL HYDRO-HYDRO 3200 4777 25300
KADRA HPS KPCL HYDRO-HYDRO 15000 16889 26800
NAGJHARI KPCL HYDRO-HYDRO 90000 155159 9800
KODASALLI DPH KPCL HYDRO-HYDRO 12000 14854 19200
MUNIRA+MGH+SPH+SPH KPCL HYDRO-HYDRO 22640 48211 7900
SHARAVATHY HPS KPCL HYDRO-HYDRO 108550 276215 5400
ALMATTI DPH KPCL HYDRO-HYDRO 29000 39611 24600
VARAHI UGPH KPCL HYDRO-HYDRO 46000 71368 15600
IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 17196 15300
IDUKKI HPS KSEB HYDRO-HYDRO 78000 137905 15300
KAKKAD HPS KSEB HYDRO-HYDRO 5000 13063 15300
KALLADA HPS KSEB HYDRO-HYDRO 1500 4436 15300
KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 46544 15300
KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 635 15300
LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 30822 15300
MALANKARA HPS KSEB HYDRO-HYDRO 1050 2474 15300
MATTUPETTY KSEB HYDRO-HYDRO 200 230 15300
MALAMPUZHA KSEB HYDRO-HYDRO 250 063 15300
CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 864 15300
URUMI ST I amp II KSEB HYDRO-HYDRO 615 903 15300
LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 248 15300
NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7765 19625 15300
PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 16601 15300
PANNIAR HPS KSEB HYDRO-HYDRO 3240 6217 15300
PORINGALKUTHU KSEB HYDRO-HYDRO 3600 10052 15300
PORINGALKUTHU LBE KSEB HYDRO-HYDRO 1600 9438 15300
PEPPARA KSEB HYDRO-HYDRO 300 395 15300
POOZHITHODE KSEB HYDRO-HYDRO 480 1045 15300
Page 38
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) PEECHI KSEB HYDRO-HYDRO 125 040 15300
RANI-PERUNADU KSEB HYDRO-HYDRO 400 585 15300
SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 79783 15300
SENGULAM HPS KSEB HYDRO-HYDRO 5120 11558 15300
SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 16711 15300
VILANGAD KSEB HYDRO-HYDRO 750 1578 15300
BARAPOLE KSEB HYDRO-HYDRO 1500 1932 15300
VELLATHOOVAL KSEB HYDRO-HYDRO 360 305 15300
CHIM0NY KSEB HYDRO-HYDRO 250 156 15300
ADYANPARA KSEB HYDRO-HYDRO 350 501 15300
BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 554 15300
KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 3801 15300
KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 23132 32800
ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 14416 62280
METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 523970 62280
METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 321270 62280
NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 336575 62280
NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 591240 62280
TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 508966 62280
KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 30897 62280
VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 18720 90699 62280
KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 33593 62280
BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 1047 62280
PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 1250 62280
PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 330 62280
MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 4897 62280
MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 032 62280
KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15681 62280
KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 40608 62280
KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 21342 62280
KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 4717 62280
KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4322 62280
KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2399 62280
METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 4416 62280
METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 8035 62280
BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2187 62280
BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2359 62280
BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2511 62280
BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 1949 62280
BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 1819 62280
POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 172 62280
SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 241 62280
MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 026 62280
THIRUMOORTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 136 62280
PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 9309 62280
VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 353 62280
SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 4192 62280
PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 6571 62280
SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 1186 62280
SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6319 62280
ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 6122 62280
KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 28674 62280
SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 18381 62280
SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 4258 62280
KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 12680 62280
KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4201 62280
ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 000 62280
PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 19175 62280
AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 078 62280
BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 504 62280
BHAVANI KATTALAI (BKB)(IIIampIII BB I amp II)TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 5847 62280
PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 000 62280
Page 39
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) SRI DAMODARAM STPS APPDCL THERMAL-COAL 160000 808108 36300
PRIVATE SECTOR
KARUPPUR TANJORE LANCO TANJORE PCL THERMAL-GAS 12000 48096 28770
SIMHAPURI ENERGY LTD SIMHAPURI ENERGY LTD THERMAL-COAL 60000 143900 39100
JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 7111 45500
SBU 1 JSW ENERGY LTD
VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 26000 159100
43300
SBU 2 JSW ENERGY LTD
VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 60000 247900
42800
LANCO KPLLANCO KONDAPALLI POWER
LTDTHERMAL-GAS 36814 85060
25776
LANCO KPL STG -IILANCO KONDAPALLI POWER
LTDTHERMAL-GAS 36600 12979
46330
LANCO KPL STG -IIIALANCO KONDAPALLI POWER
LTDTHERMAL-GAS 37100 85710
46330
LANCO KPL STG -III BLANCO KONDAPALLI POWER
LTDTHERMAL-GAS 37100 43639
46330
HINDUJA NATIONAL PCL HINDUJA NATIONAL PCL THERMAL-COAL 104000 303000 38200
MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 121164 49940
UDUPI POWER COR LTD ADANI POWER LTD THERMAL-COAL 120000 754613 42500
SPECTRUM POWER GENERATION
LTD SPECTRUM PG LTD THERMAL-GASN 20525 9256812
34952
TAQA NEYVELI POWER COM PVT
LTD TAQA NEYVELI THERMAL-LIG 25000 5840
34500
ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 251000 51000
ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 207860 36800
GMR VEMAGIRI POWER GENERATION
LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 30117
46450
EASTERN REGION
CENTRAL SECTOR
MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 64675 53113
MTPS STAGE - II KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 39000 1432 69138
BOKARO `B` TPS DVC THERMAL-COAL 63000 145670 31539
MEJIA TPS U 1-3 DVC THERMAL-COAL 63000 348298 31552
MEJIA TPS U 4 DVC THERMAL-COAL 21000 116099 34997
MEJIA TPS U 5-6 DVC THERMAL-COAL 50000 276427 35976
MEJIA TPS U 7-8 DVC THERMAL-COAL 100000 552854 36991
DURGAPUR STEEL TPS DVC THERMAL-COAL 100000 665550 39323
DURGAPUR TPS DVC THERMAL-COAL 21000 59270 35416
RAGHUNATHPUR TPS DVC THERMAL-COAL 120000 201650 35326
MAITHON HYDEL STA DVC HYDRO-HYDRO 6320 12200 17984
CHANDRAPURA TPSU1-3 DVC THERMAL-COAL 42000 257610 35095
CHANDRAPURA TPSU7-8 DVC THERMAL-COAL 50000 306673 34987
KODERMA TPS DVC THERMAL-COAL 100000 380180 38131
PANCHET HPS DVC HYDRO-HYDRO 8000 13360 17984
TILLAYA HPS DVC HYDRO-HYDRO 400 1410 17984
RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34700 35400
TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 277300 23200
TLDP -III NHPC LTD HYDRO-HYDRO 13200 55400 62000
TLDP -IV NHPC LTD HYDRO-HYDRO 16000 60300 25600
FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 957219 33700
FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 308943 41000
BONGAINGAON TPS NTPC LTD THERMAL-COAL 25000 153663 58600
KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 542277 34200
KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 942591 34200
BARH-II NTPC LTD THERMAL-COAL 132000 728021 44500
TALCHER TPS NTPC LTD THERMAL-COAL 46000 335521 30100
TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 702319 25600
TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1436521 24700
STATE SECTOR
BTPS(RampM) BIHAR STATE PGCL THERMAL-COAL 22000 12142 39700
BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 98331 10602
HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 50593 9482
CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 19689 2605
RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 53192 6033
UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 147208 14637
Page 40
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 60353 4519
IB TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 288567 25000
J P H GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 210 038 61100
MEYONG CHU GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 400 1086 61100
TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 122667 38200
DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 214339 43321
KOLAGHAT THERMAL POWER
STATION
WEST BENGAL PDCL THERMAL-COAL 126000 538269 31603
BAKRESHWAR THERMAL POWER
PLANT
WEST BENGAL PDCL THERMAL-COAL 105000 634876 32154
BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 45000 166855 33299
SANTHALDIH THERMAL POWER
STATION
WEST BENGAL PDCL THERMAL-COAL 50000 336442 34932
SAGARDIGHI THERMAL POWER
PROJECT
WEST BENGAL PDCL THERMAL-COAL 160000 423121 34705
JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 20344 68900
RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 24559 68900
TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 4623 68900
PURULIA PUMPED STORAGE
PROJECT
WEST BENGAL SEDCL HYDRO-HYDRO 90000 108816 68900
MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2768 68900
PRIVATE SECTOR
CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 49474 20230
CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 555500 70200
HALDIA ENERGY HALDIA ENERGY LTD THERMAL-COAL 60000 371000 50400
DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3688 63400
KAMALANGA TPS GMR KAMALANGA ENERGY LTD THERMAL-COAL 105000547670
33300
ADHUNIK POWER U-1 ADHUNIK POWER THERMAL-COAL 27000 158 44060
ADHUNIK POWER U-2 ADHUNIK POWER THERMAL-COAL 27000 168 44250
VL-JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 332800 23622
JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 43000 45250
JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 71700 37030
JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 70700 35920
JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 71100 38870
JOJOBERA UNIT 5 TATA POWER COM LTD THERMAL-COAL 12000 79300 44560
JOJOBERA UNIT 6 TATA POWER COM LTD THERMAL-WHR 12000 83700 12840
IEL KALINGANAGAR U-I TATA POWER COM LTD THERMAL-WG 6750 33400 22500
IEL KALINGANAGAR U-II TATA POWER COM LTD THERMAL-WG 6750 34800 22500
MAITHON UNIT 1 amp 2 TATA POWER COM LTD THERMAL-COAL 105000 678000 36100
HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 27500 24340
HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 28400 24340
HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 15800 24310
NORTH EASTERN REGION
CENTRAL SECTOR
LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 74100 36600
AGARTALA GT NEEPCO THERMAL-GAS 13500 88611 27210
ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 153111 32310
DOYANG HEP NEEPCO HYDRO-HYDRO 7500 25598 49801
KOPILI HEP NEEPCO HYDRO-HYDRO 20000 98186 11491
KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 19582 20237
KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 10310 17968
RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 124093 22945
TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 10100 17344 39000
STATE SECTOR
HYDRO POWER (122 Stns) ITANAGAR GOVT OF ARUNACHAL
PRADESHHYDRO-HYDRO 6971 6217270
24600
KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39514 17337
LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 82327 36810
NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 33318 48290
MYNTRIANG SHEP ST II ASSAM POWER GENCO HYDRO-HYDRO 300 567 35776
LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 9130 49200
LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 012 49200
DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 022 49200
TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 000 49200
UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 4990 16000
UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 6476 37000
UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 16494 14600
UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 3600 9556 15000
SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 758 8000
MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44070 44800
KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 154 41400
TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 091 41400
MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 411 41400
MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 394 41400
KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 760 41400
SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 3264 41400
LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 044 41400
BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 18953 28000
ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 43585 28200
GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 4080 11100
Note
LIG Lignite N Naptha WHR Waste Heat Recovery
Page 41
SN Contents Page
1 Executive summary of Target and Achievement of Substations during 2019-20 21(1)
2Sub Stations (220 kV and above) commissionedready for commisssioning during Apr-
201921(2)
Section D - Sub Stations
1 Executive summary of Target and Achievement of Substations during 2019-2020 As on 30-04-19
(All figures in circuit MVA)
Ce
ntr
al S
ecto
r
Sta
te S
ecto
r
JV
Pri
va
te S
ecto
r
To
tal
Ce
ntr
al S
ecto
r
Sta
te S
ecto
r
JV
Pri
va
te S
ecto
r
To
tal
Ce
ntr
al S
ecto
r
Sta
te S
ecto
r
JV
Pri
va
te S
ecto
r
To
tal
Ce
ntr
al S
ecto
r
Sta
te S
ecto
r
JV
Pri
va
te S
ecto
r
To
tal
Ce
ntr
al S
ecto
r
Sta
te S
ecto
r
JV
Pri
va
te S
ecto
r
To
tal
Ce
ntr
al S
ec
tor
Sta
te S
ec
tor
JV
Pri
va
te S
ec
tor
Gra
nd
To
tal
3000 0 0 3000 0 0 0 0 18000 3000 6000 27000 5205 19665 4260 29130 800 21786 0 22586 27005 44451 10260 81716
Apr19 Programme 0 0 0 0 0 0 0 0 3000 0 3000 6000 0 1000 2000 3000 0 800 0 800 3000 1800 5000 9800
Achievement 0 0 0 0 0 0 0 0 500 0 0 500 815 1980 0 2795 0 1305 0 1305 1315 3285 0 4600
Upto Apr-19 Programme 0 0 0 0 0 0 0 0 3000 0 3000 6000 0 1000 2000 3000 0 800 0 800 3000 1800 5000 9800
Achievement 0 0 0 0 0 0 0 0 500 0 0 500 815 1980 0 2795 0 1305 0 1305 1315 3285 0 4600
21(1)
220 kV Grand Total 800 kV 500 kV
Programme 2019-20
Programme
Achievement
HVDC765 kV 400 kV
As on 30-04-19
Sl Voltage Ratio Capacity
No (kVkV) (MWMVA)
1 2 3 4 5
1 Bhadla SS (3x1500 3x500 MVA) 765400 PGCIL 500
2 Extn at Tumkur (Pavagada ) PS (2x500 MVA) 400220 PGCIL 500
3 Bongaigaon (2nd ICT) Ss 400220 PGCIL 315
Total of CENTRAL SECTOR 1315
4 Motiram Adda Gorakhpur (Aug) (Additional TF) 400220 UPPTCL 240
5 Muradnagar-II Ghaziabad (Aug) (Additional TF) 400220 UPPTCL 240
6 Noida Sec- 148 GBNagar (New) 400220 UPPTCL 5007 Sarnath Varanasi (Aug) TF- II (500-315) 400220 UPPTCL 1858 Sarojininagar Lucknow Aug) TF- II (500-315) 400220 UPPTCL 185
9 Unnao (Aug) TF-III 400220 UPPTCL 31510 Nawada SS 400220 HVPNL 31511 Kharepatan SS 22033 MSETCL 2512 Prathipadu SS 220132 APTRANSCO 10013 Pali Ss 22066 HVPNL 160
14 A-5 Faridabad Ss 22066 HVPNL 60
15 Rentachintala Ss Aug(3X100-2x100) 220132 APTRANSCO 10016 Amethi Ss 220132 UPPTCL 160
17 Gajokhar Varanasi (Aug) TF- II (160-100) 220132 UPPTCL 60
18 Gola Gorakhpur (New) 220132 UPPTCL 160
19 Khurja Bulandshahr (Aug) TF- II (200-160) 220132 UPPTCL 40
20 RC Green GB Nagar (Aug) TF-II (160-100) 220132 UPPTCL 60
21 Sikandrabad Bulandshahr (Aug) (Additional TF) 220132 UPPTCL 160
22 Sitapur (Aug) (Additional TF) 220132 UPPTCL 160
23 Sohawal Ayodhya (Aug) TF-II (160-100) 220132 UPPTCL 60
TOTAL STATE SECTOR 3285
GRAND TOTAL 4600
21(2)
CENTRAL SECTOR
STATE SECTOR
2Sub-Stations (220 kV and above) CommissionedReady for commissioning During Apr-2019
Name of Sub Stations Executing Agency
SN Contents Page
1 Electricity Generation (MU) Targets and Achievements for 2019-20 22
Section E - Electricity Generation
Programme Achievement Ach Programme Achievement Ach
Central Sector 37545100 3177900 3129530 9848 3177900 3129530 9848
State Sector 37498600 3322500 2950558 8881 3322500 2950558 8881
PvtIPP Sector 37346200 3236400 3195940 9875 3236400 3195940 9875
PvtUTL Sector 1823100 159300 165579 10394 159300 165579 10394
Total 114213000 9896100 9441607 9541 9896100 9441607 9541
Central Sector 5661700 386100 481390 12468 386100 481390 12468
State Sector 6680500 498200 536514 10769 498200 536514 10769
PvtIPP Sector 1206900 57300 80405 14032 57300 80405 14032
PvtUTL Sector 144100 12300 10930 8886 12300 10930 8886
Total 13693200 953900 1109239 11628 953900 1109239 11628
Central Sector 4472000 367300 317765 8651 367300 317765 8651
Total 4472000 367300 317765 8651 367300 317765 8651
Bhutan Import 621800 17500 24396 13941 17500 24396 13941
Central Sector 47678800 3931300 3928685 9993 3931300 3928685 9993
State Sector 44179100 3820700 3487072 9127 3820700 3487072 9127
Pvt Sector 40520300 3465300 3452854 9964 3465300 3452854 9964
Total 133000000 11234800 10893007 9696 11234800 10893007 9696
Provisional based on actual-cum-Assesment
Figs in MU
Cummulative
Achievement
Cummulative
Achievement
Mar-19 Mar-18 Upto Mar-2019 Upto Mar-2018
984785 869291 12675910 10183949
22
1 Electricity Generation (MU) Targets and Achievememts for 2019-20
All India Energy Generation During Apr-19 to Apr-19 (MU)
Target (2019-20)Apr-19 to Apr-19
Sector
Hydro
Thermal
Nuclear
Renewable Energy Generation
Achievement
Apr-2019
98961
95393673
112348
94416
11092
3178
108930
0
20000
40000
60000
80000
100000
120000
Thermal Hydro Nuclear Total
Programme
Achievement
SN Contents Page
1 Energy Power Supply Position (Provisional) for Apr-2019 and during Apr-19 to Apr-19 23
2 Peak Power Supply Position (Provisional) for Apr-2019 and during Apr-19 to Apr-19 24
3 Energy Power Supply Position (Revised) for Mar-2019 and during Apr-19 to Mar-19 25
4 Peak Power Supply Position (Revised) for Mar-2019 and during Apr-19 to Mar-19 26
5 Notified Power cuts Restrictions on Industries during Apr-2019 27
6 Power Supply to Agricultural Sector during Apr-2019 28
Section F - Power supply position
आकड़ मममलयन यननट नट Figures in MU net
ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied
कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )
चडीगढ़ Chandigarh 117 117 0 00 117 117 0 00
दिलली Delhi 2698 2698 1 00 2698 2698 1 00
हरियजणज Haryana 3773 3773 0 00 3773 3773 0 00
दहमजचल परिश Himachal Pradesh 777 777 0 00 777 777 0 00
रमम कशमीि Jammu amp Kashmir 1604 1296 308 192 1604 1296 308 192
परजब Punjab 3646 3646 0 00 3646 3646 0 00
िजरसथजन Rajasthan 6210 6208 2 00 6210 6208 2 00
उतति परिश Uttar Pradesh 10179 10148 32 03 10179 10148 32 03
उततिजखड Uttarakhand 1120 1120 0 00 1120 1120 0 00
उततरी कषतर Northern Region 30094 29786 308 10 30094 29786 308 10
छततीसगढ़ Chhattisgarh 2684 2676 8 03 2684 2676 8 03
गरिजत Gujarat 10718 10718 0 00 10718 10718 0 00
मधय परिश Madhya Pradesh 6006 6006 0 00 6006 6006 0 00
महजिजषटर Maharashtra 14308 14308 0 00 14308 14308 0 00
िमन औि दिउ Daman amp Diu 220 220 0 00 220 220 0 00
िजिि व नगि हवली Dadra amp Nagar Haveli 552 552 0 00 552 552 0 00
गोवज Goa 388 388 0 00 388 388 0 00
पशचिमी कषतर Western Region 34875 34868 8 00 34875 34868 8 00
आनधर परिश Andhra Pradesh 5708 5708 0 00 5708 5708 0 00
तलगजनज Telangana 5725 5725 0 00 5725 5725 0 00
कनजाटक Karnataka 7003 7003 0 00 7003 7003 0 00
किल Kerala 2402 2400 2 01 2402 2400 2 01
तममल नजड Tamil Nadu 10010 10010 0 00 10010 10010 0 00
पडचिी Puducherry 263 263 0 00 263 263 0 00
लकष-दवीप Lakshadweep 4 4 0 0 4 4 0 0
दकषकषणी कषतर Southern Region 31111 31109 2 00 31111 31109 2 00
बबहजि Bihar 2589 2589 0 00 2589 2589 0 00
िजमोिि घजटी ननगम DVC 1772 1772 0 00 1772 1772 0 00
झजिखणड Jharkhand 689 689 0 00 689 689 0 00
ओडडशज Odisha 2689 2689 1 00 2689 2689 1 00
पशशचम बगजल West Bengal 5075 5075 0 00 5075 5075 0 00
मसशककम Sikkim 37 37 0 00 37 37 0 00
अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 7 29 27 2 7
परवी कषतर Eastern Region 12851 12850 1 00 12851 12850 1 00
अरणजचल परिश Arunachal Pradesh 66 66 0 05 66 66 0 05
असम Assam 766 709 57 75 766 709 57 75
मणणपि Manipur 68 67 1 15 68 67 1 15
मघजलय Meghalaya 170 160 10 59 170 160 10 59
ममज़ोिम Mizoram 54 53 0 08 54 53 0 08
नजगजलड Nagaland 54 54 0 08 54 54 0 08
बिपिज Tripura 122 120 1 12 122 120 1 12
उततर-परवी कषतर North-Eastern Region 1300 1228 71 55 1300 1228 71 55
समपणण भारत All India 110231 109842 389 04 110231 109842 389 04
23
ऊरजा पनत ा म कमी ऊरजा पनत ा म कमीEnergy not Supplied
Excludes energy exported to Bangladesh
Energy not Supplied
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
ऊराण वरवदयत आपरत ण शथिरत ररपोरण (परवाणरवलोकन) Energy Power Supply Position Report (Provisional)
राजयState
अपरल 2019 April2019 अपरल2019 -अपरल2019 April2019 to April2019
अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met
कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )
चडीगढ़ Chandigarh 256 256 0 00 256 256 0 00
दिलली Delhi 5664 5664 0 00 5664 5664 0 00
हरियजणज Haryana 8127 8127 0 00 8127 8127 0 00
दहमजचल परिश Himachal Pradesh 1387 1387 0 00 1387 1387 0 00
रमम कशमीि Jammu amp Kashmir 2826 2261 565 200 2826 2261 565 200
परजब Punjab 7015 7015 0 00 7015 7015 0 00
िजरसथजन Rajasthan 10560 10560 0 00 10560 10560 0 00
उतति परिश Uttar Pradesh 19935 19935 0 00 19935 19935 0 00
उततिजखड Uttarakhand 1922 1922 0 00 1922 1922 0 00
उततरी कषतर Northern Region 54476 53985 491 09 54476 53985 491 09
छततीसगढ़ Chhattisgarh 4596 4574 22 05 4596 4574 22 05
गरिजत Gujarat 17871 17865 6 00 17871 17865 6 00
मधय परिश Madhya Pradesh 10018 10018 0 00 10018 10018 0 00
महजिजषटर Maharashtra 23158 23150 8 00 23158 23150 8 00
िमन औि दिउ Daman amp Diu 341 340 1 02 341 340 1 02
िजिि व नगि हवली Dadra amp Nagar Haveli 818 818 0 00 818 818 0 00
गोवज Goa 594 594 0 00 594 594 0 00
पशचिमी कषतर Western Region 56242 56222 20 00 56242 56222 20 00
आनधर परिश Andhra Pradesh 9151 9151 0 00 9151 9151 0 00
तलगजनज Telangana 10191 10191 0 00 10191 10191 0 00
कनजाटक Karnataka 12681 12681 0 00 12681 12681 0 00
किल Kerala 4309 4300 8 02 4309 4300 8 02
तममल नजड Tamil Nadu 15972 15972 0 00 15972 15972 0 00
पडचिी Puducherry 482 480 2 05 482 480 2 05
लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0
दकषकषणी कषतर Southern Region 49155 49103 52 01 49155 49103 52 01
बबहजि Bihar 5357 5357 0 00 5357 5357 0 00
िजमोिि घजटी ननगम DVC 3039 3039 0 00 3039 3039 0 00
झजिखणड Jharkhand 1266 1266 0 00 1266 1266 0 00
ओडडशज Odisha 5389 5389 0 00 5389 5389 0 00
पशशचम बगजल West Bengal 8666 8666 0 00 8666 8666 0 00
मसशककम Sikkim 100 100 0 00 100 100 0 00
अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7
परवी कषतर Eastern Region 23349 23349 0 00 23349 23349 0 00
अरणजचल परिश Arunachal Pradesh 139 136 3 22 139 136 3 22
असम Assam 1712 1667 45 26 1712 1667 45 26
मणणपि Manipur 197 188 9 46 197 188 9 46
मघजलय Meghalaya 336 336 0 00 336 336 0 00
ममज़ोिम Mizoram 116 113 3 26 116 113 3 26
नजगजलड Nagaland 157 131 26 166 157 131 26 166
बिपिज Tripura 292 291 1 03 292 291 1 03
उततर-परवी कषतर North-Eastern Region 2848 2780 68 24 2848 2780 68 24
समपणण भारत All India 177411 176810 601 03 177411 176810 601 03
24
मजग की पनत ा म कमी Demand not Met
Excludes the supply to Bangladesh
राजयStateअपरल 2019 April2019
मजग की पनत ा म कमी Demand not Met
अधिकतम वरवदयत आपरत ण शथिरत ररपोरण (परवाणरवलोकन) Peak Power Supply Position Report (Provisional)
आकड़ मगज वजट नट Figures in MW netअपरल2019 -अपरल2019 April2019 to April2019
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
आकड़ मममलयन यननट नट Figures in MU net
ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied
कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )
चडीगढ़ Chandigarh 96 96 0 00 1561 1561 0 00
दिलली Delhi 1931 1930 1 00 32299 32282 17 01
हरियजणज Haryana 3658 3658 0 00 53665 53665 0 00
दहमजचल परिश Himachal Pradesh 832 830 2 02 9850 9618 232 24
रमम कशमीि Jammu amp Kashmir 1767 1414 353 200 19593 15868 3725 190
परजब Punjab 3585 3585 0 00 55288 55275 13 00
िजरसथजन Rajasthan 6774 6770 4 01 79826 79637 189 02
उतति परिश Uttar Pradesh 8754 8691 63 07 117101 116118 984 08
उततिजखड Uttarakhand 1067 1067 0 00 13845 13753 92 07
उततरी कषतर Northern Region 28464 28041 423 15 383028 377776 5251 14
छततीसगढ़ Chhattisgarh 2464 2457 8 03 26130 26076 54 02
गरिजत Gujarat 9890 9890 0 00 116588 116572 15 00
मधय परिश Madhya Pradesh 6236 6236 0 00 75667 75665 2 00
महजिजषटर Maharashtra 13631 13631 0 00 158285 158148 137 01
िमन औि दिउ Daman amp Diu 221 221 0 00 2557 2557 0 00
िजिि व नगि हवली Dadra amp Nagar Haveli 553 553 0 00 6317 6317 0 00
गोवज Goa 362 362 0 00 4283 4280 3 01
पशचिमी कषतर Western Region 33357 33349 8 00 389827 389615 212 01
आनधर परिश Andhra Pradesh 6072 6071 1 00 63735 63677 58 01
तलगजनज Telangana 6930 6929 1 00 66697 66635 62 01
कनजाटक Karnataka 7614 7612 1 00 71759 71690 69 01
किल Kerala 2489 2488 1 00 25029 24911 118 05
तममल नजड Tamil Nadu 10247 10245 2 00 109375 109273 102 01
पडचिी Puducherry 252 251 1 04 2761 2751 10 03
लकष-दवीप Lakshadweep 4 4 0 0 46 46 0 0
दकषकषणी कषतर Southern Region 33605 33597 8 00 339355 338938 417 01
बबहजि Bihar 2319 2318 1 00 30052 29827 225 07
िजमोिि घजटी ननगम DVC 1773 1772 1 00 22365 21995 369 17
झजिखणड Jharkhand 698 697 1 01 8682 8461 221 25
ओडडशज Odisha 2583 2582 1 00 31810 31781 30 01
पशशचम बगजल West Bengal 4585 4584 2 00 52237 52078 159 03
मसशककम Sikkim 41 41 0 00 513 512 0 01
अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 67 346 323 23 67
परवी कषतर Eastern Region 11999 11995 5 00 145658 144654 1004 07
अरणजचल परिश Arunachal Pradesh 61 60 0 06 864 855 9 10
असम Assam 680 656 23 34 9532 9204 328 34
मणणपि Manipur 68 68 1 09 916 906 10 11
मघजलय Meghalaya 173 173 0 03 1955 1953 1 01
ममज़ोिम Mizoram 50 49 0 09 668 661 8 12
नजगजलड Nagaland 58 57 1 20 902 809 93 103
बिपिज Tripura 150 150 0 00 1859 1837 21 11
उततर-परवी कषतर North-Eastern Region 1240 1214 26 21 16696 16225 471 28
समपणण भारत All India 108665 108196 469 04 1274564 1267209 7355 06
Note The revised data for March 2019 is not avaliable
Excludes energy exported to Bangladesh
राजयState
ऊराण वरवदयत आपरत ण शथिरत ररपोरण (परवाणरवलोकन) Energy Power Supply Position Report (Provisional)
25
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
Energy not Supplied Energy not Supplied
मािण2019 March2019 अपरल2018 -मािण2019 April2018 to March2019
ऊरजा पनत ा म कमी ऊरजा पनत ा म कमी
अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met
कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )
चडीगढ़ Chandigarh 223 223 0 00 369 369 0 00
दिलली Delhi 4016 4016 0 00 7016 7016 0 00
हरियजणज Haryana 6544 6544 0 00 10270 10270 0 00
दहमजचल परिश Himachal Pradesh 1683 1683 0 00 1700 1700 0 00
रमम कशमीि Jammu amp Kashmir 3277 2622 655 200 3277 2622 655 200
परजब Punjab 6564 6564 0 00 12638 12638 0 00
िजरसथजन Rajasthan 11885 11885 0 00 13276 13276 0 00
उतति परिश Uttar Pradesh 16220 16220 0 00 20498 20062 436 21
उततिजखड Uttarakhand 2002 2002 0 00 2216 2216 0 00
उततरी कषतर Northern Region 47925 47356 569 12 63166 61726 1440 23
छततीसगढ़ Chhattisgarh 4444 4128 316 71 4444 4270 174 39
गरिजत Gujarat 16263 16263 0 00 17053 16963 90 05
मधय परिश Madhya Pradesh 12328 12323 5 00 13815 13815 0 00
महजिजषटर Maharashtra 22361 22291 70 03 23864 23254 610 26
िमन औि दिउ Daman amp Diu 336 336 0 01 357 356 1 02
िजिि व नगि हवली Dadra amp Nagar Haveli 800 799 1 01 816 815 1 01
गोवज Goa 538 538 0 00 596 596 0 00
पशचिमी कषतर Western Region 53132 52965 167 03 56675 55821 853 15
आनधर परिश Andhra Pradesh 8977 8977 0 00 9459 9453 6 01
तलगजनज Telangana 10471 10471 0 00 10815 10815 0 00
कनजाटक Karnataka 12841 12841 0 00 12841 12841 0 00
किल Kerala 4264 4228 36 09 4264 4228 36 09
तममल नजड Tamil Nadu 15712 15712 0 00 15712 15712 0 00
पडचिी Puducherry 427 412 15 34 427 412 15 34
लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0
दकषकषणी कषतर Southern Region 49464 49464 0 00 49464 49464 0 00
बबहजि Bihar 4633 4633 0 00 5115 5084 31 06
िजमोिि घजटी ननगम DVC 3035 3035 0 00 3035 3035 0 00
झजिखणड Jharkhand 1210 1210 0 00 1339 1291 48 36
ओडडशज Odisha 4827 4827 0 00 5357 5357 0 00
पशशचम बगजल West Bengal 8287 8287 0 00 9130 9123 7 01
मसशककम Sikkim 100 100 0 00 106 106 0 00
अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7
परवी कषतर Eastern Region 21658 21658 0 00 23141 22733 408 18
अरणजचल परिश Arunachal Pradesh 133 131 2 15 138 138 0 01
असम Assam 1539 1508 31 20 1865 1809 56 30
मणणपि Manipur 204 199 5 25 219 216 3 12
मघजलय Meghalaya 357 357 0 00 374 372 1 04
ममज़ोिम Mizoram 108 105 3 28 121 119 2 17
नजगजलड Nagaland 127 125 2 16 156 138 18 116
बिपिज Tripura 249 249 0 00 298 293 5 17
उततर-परवी कषतर North-Eastern Region 2540 2535 5 02 2967 2850 117 39
समपणण भारत All India 169464 168745 719 04 177022 175528 1494 08
Note The revised data for March 2019 is not avaliable 26
अधिकतम वरवदयत आपरत ण शथिरत ररपोरण (परवाणरवलोकन) Peak Power Supply Position Report (Provisional)
आकड़ मगज वजट नट Figures in MW net
राजयStateमािण2019 March2019 अपरल2018 -मािण2019 April2018 to March2019
मजग की पनत ा म कमी मजग की पनत ा म कमी Demand not MetDemand not Met
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
Excludes the supply to Bangladesh
अपरल 2019 April2019 अपरल2018 -मािण2019 April2019 to April2019
उततरी कषतर Northern Region
चडीगढ़ Chandigarh(Data Not Received)दिलली Delhi
हरियजणज Haryana
दहमजचल परिश Himachal Pradeshरमम कशमीि Jammu amp Kashmir(Data
Not Received)परजब Punjab
िजरसथजन Rajasthanउतति परिश Uttar Pradesh
उततिजखड Uttarakhand
पशचिमी कषतर Western Region
छततीसगढ़ Chhattisgarh
Apr-Nov 2018- No cuts
Maximum Demand cut-58MW
Energy cut- 00020-00032 MUsday
गरिजत Gujarat
मधय परिश Madhya Pradesh
महजिजषटर Maharashtra
गोवज Goa
दकषकषणी कषतर Southern Region
आनधर परिश Andhra Pradesh
तलगजनज Telangana
कनजाटक Karnataka
किल Kerala
तममल नजड Tamil Nadu
पडचिी Puducherryपरवी कषतर Eastern Region
बबहजि Bihar
झजिखणड Jharkhand
ओडडशज Odisha
पशशचम बगजल West Bengal
No N
otifie
d Cu
ts
27
मािण 2019 म इडथरीर पर वरवदयत करौती का वरवरवरण Notified Power CutsRestrictions on Industries during April2019
राजय कषतर State Regionऊराणमाग करौती EnergyDemand Cut
No N
otifie
d Cu
tsNo
Notifie
d Cu
ts
अपरल2019 April 2019 अपरल2019 -अपरल2019 April2019 to April2019
उततरी कषतर Northern Region
चडीगढ़ Chandigarh Data not received Data not received
दिलली Delhi Data not received Data not received
हरियजणज Haryana 0811 hrsday 0811 hrsday
दहमजचल परिश Himachal Pradesh HPSEBL has only 2 agriculture consumers and uninterrupted
power is being supplied to agriculture sector
HPSEBL has only 2 agriculture consumers and uninterrupted
power is being supplied to agriculture sector
रमम कशमीि Jammu amp Kashmir Data not received Data not received
परजब Punjab 379 hrsday 379 hrsday
िजरसथजन Rajasthan 0630 hrsday 0630 hrsday
उतति परिश Uttar Pradesh 2157 hrsday 2157 hrsday
उततिजखड Uttarakhand 2359 hrsday 2359 hrsday
पशचिमी कषतर Western Region
छततीसगढ़ Chhattisgarh 18 hrsday 18 hrsday
गरिजत Gujarat 8 hrsday 8 hrsday
मधय परिश Madhya Pradesh Three-Phase Supply(Irrigation)- 0953 hrs day Three-Phase
(Mixed) Supply - 2334 hrs day
Three-Phase Supply(Irrigation)- 0953 hrs day Three-Phase
(Mixed) Supply - 2334 hrs day
महजिजषटर Maharashtra Three-Phase Supply(Irrigation)- 9 hrs day Three-Phase Supply(Irrigation)- 9 hrs day
गोवज Goa No restriction No restriction
दकषकषणी कषतर Southern Region
आनधर परिश Andhra Pradesh 07 hrsday 07 hrsday
तलगजनज Telangana 24 hrsday 24 hrsday
कनजाटक Karnataka 6 hrsday 6 hrsday
किल Kerala No Restrictions No Restrictions
तममल नजड Tamil Nadu 9 hrsday (6 hrs during day time and 3 hrs during night time) 9 hrsday (6 hrs during day time and 3 hrs during night time)
पडचिी Puducherry No Restrictions No Restrictions
परवी कषतर Eastern Region
बबहजि Bihar 18 hrsday 18 hrsday
झजिखणड Jharkhand 20 hrsday 20 hrsday
ओडडशज Odisha 24 hrsday 24 hrsday
पशशचम बगजल West Bengal 23 hrsday 23 hrsday
28
मारच 2019 कषि कषतर को षिदयत आपरतच का षििरण Power Supply to Agricultural Sector during March2019
राजय कषतर State Regionऔसत वरवदयत आपरत ण घनरो म Average Hours of Supply
On segregated feeders
SNo Contents Page
1 Growth of Installed Capacity since 6th Plan 29
2 Progress of Transmission Sector since 6th Plan 30
3 All India Yearly Coal consumption for Power Generation (Utilities)
4 All India Annual Per Capita Consumption of Electricity since -2006
5 Average cost of power supply amp Average realisation (Paisakwh)
6 Growth of Rural Electrification amp Pump Sets Energisation
7 Status of Hydro Schemes Cleared by the CEA in Apr-2019
Section G - Growth of Power Sector
31
32
(In MW)
Coal Gas Diesel Total
End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472
End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634
End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537
End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596
End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921
End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703
End of 12th Plan 19216288 2532938 83763 21832988 6780 4447842 50018 31960630
Up to Apr-2019 20070450 2493722 63763 22627934 678000 4539922 7764163 35610019
Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-17) = 51529 MW
Electricity Generation (MU) Targets and Achievements for 2016-17
Coal Gas Diesel Nuclear Hydro Res Total
2007045 2493722 637629 678000 453992 77641625 22925174
29
1 Growth of Installed Capacity Since 6th Plan
Plan YearThermal
Nuclear Hydro RES (MNRE) Total
2007045
2493722637629
678000
4539922
77641625
Total Installed Capacity 35610019 MW
Coal Gas Diesel Nuclear Hydro Res
Progress of Transmission Sector in the Country up to April 2019
1 TRANSMISSION LINES (All fig in CKM)
At the end of
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
6th plan 0 0 0 0 0 0 0 0 0 0 0 0 1831 4198 0 6029 1641 44364 0 46005 3472 48562 0 52034
7th plan 0 0 0 0 0 0 0 0 0 0 0 0 13068 6756 0 19824 4560 55071 0 59631 17628 61827 0 79455
8th plan 0 0 0 0 1634 0 0 1634 0 0 0 0 23001 13141 0 36142 6564 73036 0 79600 31199 86177 0 117376
9th plan 0 0 0 0 3234 1504 0 4738 751 409 0 1160 29345 20033 0 49378 8687 88306 0 96993 42017 110252 0 152269
10th plan 0 0 0 0 4368 1504 0 5872 1775 409 0 2184 48708 24730 0 73438 9444 105185 0 114629 64295 131828 0 196123
11th Plan 0 0 0 0 5948 1504 1980 9432 4839 411 0 5250 71023 30191 5605 106819 10140 125010 830 135980 91950 157116 8415 257481
12th Plan 6124 0 0 6124 5948 1504 1980 9432 25465 1177 4598 31240 92482 48240 17065 157787 11014 151276 978 163268 141033 202197 24621 367851
13th Plan (Up
to Mar2019)6124 0 0 6124 5948 1504 1980 9432 33692 1512 6605 41809 101335 58238 21173 180746 11734 162552 1010 175296 158833 223806 30768 413407
13th Plan (Up
to Apr-19)6124 0 0 6124 5948 1504 1980 9432 33745 1512 6605 41862 101335 58258 21173 180766 11734 162953 1010 175697 158886 224227 30768 413881
27150 600 MW of 132 kV Inter-Regional power transmission capacity links which are operated radially from time to time is not added in the total
75050
47900
24000
99050
30
Grand Total
Note - The figure upto the end of 10th plan in for stringing progress including the lines not commissioned Now only commissioned lines are reckoned Accordingly the figure for 10th plan (end) may read
as 187555 after adjusting with (-) 10852 Ckm
Inter-regional Power Transfer Capacity (MW)
plusmn 800 kV HVDC plusmn 500 kV HVDC 765 kV 400 kV 220 kV
IR addition in 12th
Plan (up to March
2017)
Inter-regional
Transmission
Capacity at the end
of Plan Period 2017-
22 (as on April19)
IR at the end of 11th
PlanIR at the end of 12th
Plan
IR Capacity Addition
at the end of Plan
Period 2017-22 (Till
April 19)
2004-05 27800
2005-06 28100
2006-07 30200
2007-08 33000
2008-09 35500
2009-10 36700
2010-11 38700
2011-12 41756
2012-13 45460
2013-14 48940
2014-15 53040
2015-16 54590
2016-17 57430
2017-18 60800
2018-19 62890
Year
2005-06
2006-07
2007-08
2008-09
2009-10
2010-11
2011-12
2012-13
2013-14
2014-15
2015-16
2016-17
2017-18
2018-19
2004-05 254 209 7568
2005-06 260 221 7636
2006-07 276 227 7423
2007-08 293 239 7727
2008-09 340 263 8713
2009-10 355 268 8870
2010-11 398 303 11975
2011-12 455 330 13514
2012-13 501 376 14867
2013-14 518 175
2014-15 520
Source- PFC Reports on the performance of State Power Utilities 31
1181
7335
7786
91441
8188
88363
957
1010
1075
1122
1149
(GrossGen+ Net Import) Mid-year population Provisional
5 Average cost of power supply amp average realization ( paiseKWH )
Yearcost of supply
(paiseunit)
Realization(paiseunit)
Including AgricultureOnly
Agriculture
6719
7171
3 All India yearly Coal Consumption for Power Generation (Utilities)
YEARCoal Consumption
Million Tonnes
4 All India Annual per Capita consumption of Electricity Since 2006
Per Capita Consumption ( kWh)
6314
Sl
NoExecuting Agency
Installed
Capacity (MW)Cost (Rs crore)
Date of
Clearance
32
Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as
Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received
from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made
available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified
villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is
independent of the earlier published reports
No Hydro Electric Project has been issued concurrenceAppraisal letter by CEA during April 2019
7 Status of Hydro Schemes Cleared by the CEA in Apr-2019
Name of Scheme
1999-002000-01
297594
010408 to 310309010409 to 310310
10th Plan
2005-062006-07
322968331020
6 Growth Of Rural Electrification amp Pumpsets Energisation
Plan Year
9th Plan2002-03
134092626
4111
Pump Sets Energised Villages Electricfied (Nos)
2001-02
284064367244
1218
27801997-981998-99
3207
482864
12632
1576036
4451722594
15455554
2314176
397343611750
2093311060316074
65109527813884
46708
18423975
499150
2003-042004-05
5743
9769
Cumu upto End of 10th Plan
010407 to 310308
010410 to 310311557976840909
010411 to 310312
412667
86293726
No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification
since 2004-05
65291374575 296361511th Plan
Cumu upto End of 11th Plan
596556 21212860
557439Cummulative up to end of 12th Plan
SN Contents Page
1 Rate of sale of power for the year 2016-17 33-41
RATE OF SALE OF POWER FOR THE YEAR 2016-17
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) NORTHERN REGION
CENTRAL SECTOR
BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 18000 66900 19800
CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 54000 222400 21600
CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 30000 144400 19600
CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 23100 91700 42600
PARBATI - III HPS NHPC LTD HYDRO-HYDRO 52000 68200 54800
DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 28000 95600 30000
CHUTAK NHPC LTD HYDRO-HYDRO 4400 22000 79800
DULHASTI HPS NHPC LTD HYDRO-HYDRO 39000 228000 56400
SALAL HPS NHPC LTD HYDRO-HYDRO 69000 342300 11000
TANAKPUR HPS NHPC LTD HYDRO-HYDRO 9420 43000 29600
URI HPS -I NHPC LTD HYDRO-HYDRO 48000 280300 16000
URI HPS - II NHPC LTD HYDRO-HYDRO 24000 147300 48600
NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 4500 24600 88200
SEWA - II NHPC LTD HYDRO-HYDRO 12000 47100 43400
ANTA CCPP NTPC LTD THERMAL-GASN 41930 67539 32400
AURAIYA CCPP NTPC LTD THERMAL-GASN 66336 53501 39100
BADARPUR TPS NTPC LTD THERMAL-COAL 70500 159153 44800
DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 84000 296170 42300
DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 98000 526686 46300
DADRI CCPP NTPC LTD THERMAL-GASHSD 82978 227469 33000
FARIDABAD CCPP NTPC LTD THERMAL-GASN 43159 115577 30800
RIHAND STPS I NTPC LTD THERMAL-COAL 100000 596766 24500
RIHAND STPS II NTPC LTD THERMAL-COAL 100000 737069 24600
RIHAND STPS III NTPC LTD THERMAL-COAL 100000 706546 30600
SINGRAULI STPS NTPC LTD THERMAL-COAL 200000 1394068 20400
TANDA TPS NTPC LTD THERMAL-COAL 44000 295438 40800
UNCHAHAR TPS I NTPC LTD THERMAL-COAL 42000 256454 39800
UNCHAHAR TPS II NTPC LTD THERMAL-COAL 42000 273577 38900
UNCHAHAR TPS III NTPC LTD THERMAL-COAL 21000 142780 43000
KOLDAM NTPC LTD HYDRO-HYDRO 80000 363260 43600
NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 303575 25841
RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 108000 668677 35374
NJHPS SJVNL HYDRO-HYDRO 150000 699496 23820
RAMPUR HPS SJVNL HYDRO-HYDRO 41202 195982 32260
TEHRI HPP THDC HYDRO-HYDRO 100000 272543 51800
KOTESHWAR HEP THDC HYDRO-HYDRO 40000 106244 53400
IGSTPS JHAJJAR ARAVALI P CPL THERMAL-COAL 150000 510429 49490
NEYVELI BARSINGSAR NEYVELI LIG CORP LTD THERMAL-LIG 25000 127520 38040
STATE SECTOR
PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 21000 14222 48200
PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 21000 19205 48400
PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 25000 102257 42600
PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 25000 62107 41800
DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 60000 312213 41000
RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 120000 35767442200
WYC HYDEL STATION HPGCL HYDRO-HYDRO 6240 20365 24900
GIRI POWER HOUSE HPSEB HYDRO-HYDRO 6000 13958 7600
ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 1695 5467 11900
BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 12000 18528 6700
GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 2250 7462 22500
BASSI POWER HOUSE HPSEB HYDRO-HYDRO 6600 29649 7500
BINWA POWER HOUSE HPSEB HYDRO-HYDRO 600 2749 19300
ANNEXURE-I
RATE OF SALE OF POWER FOR THE YEAR 2016-2017
Page 33
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) GAJ POWER HOUSE HPSEB HYDRO-HYDRO 1050 2914 26700
BANER POWER HOUSE HPSEB HYDRO-HYDRO 1200 2864 16200
HOLI POWER HOUSE HPSEB HYDRO-HYDRO 300 616 22500
THIROT POWER HOUSE HPSEB HYDRO-HYDRO 450 1126 22500
KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 1200 3064 22500
LARJI POWER HOUSE HPSEB HYDRO-HYDRO 12600 53677 23700
NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 250 750 31000
CHABA POWER HOUSE HPSEB HYDRO-HYDRO 175 465 23300
RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 150 101 13400
SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 200 000 22500
KILLAR HPSEB HYDRO-HYDRO 030 050 22500
BHABA AUGUMENP H HPSEB HYDRO-HYDRO 450 1276 22500
BS CHAMBA HPSEB HYDRO-HYDRO 045 099 19500
GUMMA HPSEB HYDRO-HYDRO 300 423 22500
GAS TURBINE POWER STATION IPGCL THERMAL-GAS 27000 67233 39300
PPS-I PPCL THERMAL-GAS 33000 175905 38300
PPS-III PPCL THERMAL-GAS 137120 196879 36100
LOWER JHELUM JampKPDD HYDRO-HYDRO 10500 60214 5100
UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 2260 10514 6300
UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 10500 44202 8500
GANDHARBAL JampKPDD HYDRO-HYDRO 1500 8925 4700
KARNAH MPH JampKPDD HYDRO-HYDRO 200 1122 31000
CHENANI I JampKPDD HYDRO-HYDRO 2330 10892 6600
CHENANI II JampKPDD HYDRO-HYDRO 200 1188 9300
CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 750 3634 14200
IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 375 2108 18500
IGO MERCHELLONG JampKPDD HYDRO-HYDRO 300 1572 29700
PAHALGAM MHP JampKPDD HYDRO-HYDRO 450 1713 32900
MARPACHOO JampKPDD HYDRO-HYDRO 075 375 29800
HAFTAL JampKPDD HYDRO-HYDRO 100 483 28700
SANJAK JampKPDD HYDRO-HYDRO 126 441 36000
SEWA-III JampKPDD HYDRO-HYDRO 900 3273 20200
BHADERWAH JampKPDD HYDRO-HYDRO 150 935 8900
BAZGO JampKPDD HYDRO-HYDRO 030 108 33300
SUMOOR JampKPDD HYDRO-HYDRO 010 045 35400
HUNDER JampKPDD HYDRO-HYDRO 040 176 26200
STAKNA JampKPDD HYDRO-HYDRO 400 1933 4100
KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 124000 662879 31360
SURATGARH TPS RRVUNL THERMAL-COAL 150000 402328 41730
CHHABRA TPS 1amp 2 RRVUNL THERMAL-COAL 50000 305946 36700
CHHABRA TPS 3 RRVUNL THERMAL-COAL 25000 151536 36700
CHHABRA TPS 4 RRVUNL THERMAL-COAL 25000 155896 36700
RAMGARH GT POWER PROJECT RRVUNL THERMAL-COAL 22050 43177 41800
RAMGARH GAS T P PROJECT 3 RRVUNL THERMAL-GAS 5000 93615 41800
DHOLPUR C C POWER PROJECT RRVUNL THERMAL-R-LNG 33000 9486 46110
MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 14000 20855 34192
MINI MICRO HYDEL (MMH) P S RRVUNL HYDRO-HYDRO 2385 851 37800
KALISINDH TPP 1 RRVUNL THERMAL-COAL 60000 341543 45000
KALISINDH TPP 2 RRVUNL THERMAL-COAL 60000 211588 45000
KHARA HEP UPJVNL HYDRO-HYDRO 7200 26654 7200
MATATILLA HEP UPJVNL HYDRO-HYDRO 3060 12219 6500
OBRA HEP UPJVNL HYDRO-HYDRO 9900 21517 6300
RIHAND UPJVNL HYDRO-HYDRO 30000 57369 5500
ANPARA A TPS UPRVUNL THERMAL-COAL 63000 317536 27000
ANPARA B TPS UPRVUNL THERMAL-COAL 100000 705605 22700
ANPARA D UPRVUNL THERMAL-COAL 100000 300158 39800
HARDUAGANJ TPS UPRVUNL THERMAL-COAL 16500 45817 49200
HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 50000 304389 46600
OBRA A TPS UPRVUNL THERMAL-COAL 28800 13158 34000
OBRA B TPS UPRVUNL THERMAL-COAL 100000 328124 21900
Page 34
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) PANKI TPS UPRVUNL THERMAL-COAL 21000 66488 50300
PARICHHA TPS UPRVUNL THERMAL-COAL 22000 38762 49400
PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 42000 231931 45600
PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 50000 276722 50400
CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 24000 70845 8290
CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 14400 75366 8390
DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 3375 9595 12080
DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 5100 18701 10520
KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4140 17359 12330
KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 12000 33001 9420
KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 3000 11953 8320
TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 9000 33983 12460
MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 30400 124510 16110
RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 19800 17897 10550
MPUR UTTARAKHAND JVNL HYDRO-HYDRO 930 5121 19200
PATHRI UTTARAKHAND JVNL HYDRO-HYDRO 2040 11636 14200
GALOGI UTTARAKHAND JVNL HYDRO-HYDRO 300 648 12500
PRIVATE SECTOR
MGTPP CLP INDIA PVT LTD THERMAL-COAL 132000 268902 41940
SHRINAGAR HEP ALAKNANDA HPCL HYDRO-HYDRO 33000 127414 48800
GAMA INFRAPROP CCPP GAMA INFRAPROP PVT THERMAL-GAS 22500 52686 47000
PPGCL (BARA) JP POWER VENTURES LTD THERMAL-COAL 198000 448200 38500
MALANA HEP MALANA PCL HYDRO-HYDRO 8600 26354 29792
MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 10000 30369 32580
ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 19200 56347 36079
KASHANG HEP H P PCL HYDRO-HYDRO 19500 5034 29200
BASPA-II HEP HBPCL HYDRO-HYDRO 30000 132769 13600
KARCHAM WANGTOO HEP HBPCL HYDRO-HYDRO 100000 434386 36600
RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 108000 582600 43700
RITHALA COMBI CY POWER PLANT TATA POWER DDL THERMAL-GAS 9480 000 11900
RAJPURA TPS NABHA POWER LTD THERMAL-GAS 140000 901484 39000
TALWANDI SABO POWER LTD TALWANDI SABO POWER LTD THERMAL-COAL 198000 636040 49548
ROJA THERMAL POWER STATION ROJA POWER SCL THERMAL-COAL 120000 727200 43400
KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 34400 63400
BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 36000 62600
MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 38200 60800
UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 37900 61500
KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 42300 58800
LALITPUR PGCL BAJAJ ENERGY PVT LTD THERMAL-COAL 198000 359400 47300
PRAYAGRAJ PGCL PRAYAGRAJ PGCL THERMAL-COAL 132000 448200 38595
KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 132000 783182 33438
WESTERN REGION
CENTRAL SECTOR
INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 100000 325333 23892
OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 52000 141663 34001
GANDHAR CCPP NTPC LTD THERMAL-GAS 65739 221924 28700
KAWAS CCPP NTPC LTD THERMAL-GASN 65620 167929 27000
KORBA I amp II NTPC LTD THERMAL-COAL 210000 1499171 20500
KORBA III NTPC LTD THERMAL-COAL 50000 358746 26600
SIPAT STPS I NTPC LTD THERMAL-COAL 198000 1479902 26800
SIPAT STPS II NTPC LTD THERMAL-COAL 100000 766549 26500
VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 126000 693142 25800
VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 100000 608781 23800
VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 100000 673475 27600
VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 100000 655924 32900
VINDHYACHAL STPS V NTPC LTD THERMAL-COAL 50000 328265 31700
MOUDA I NTPC LTD THERMAL-COAL 100000 343130 44500
MOUDA Ii NTPC LTD THERMAL-COAL 66000 40637 39900
RATNAGIRI GAS amp POWER PVT LTD RGPPL THERMAL-GAS 196708 442485 47000
KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 000 24729
TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 32000 201227 10740
Page 35
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 365122 19069
TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 787444 29324
STATE SECTOR
GSEG-HAZIRA15610 MW GUJARAT S ENEGEN LTD THERMAL-GAS 15610 1805 28200
GSEG-HAZIRA35143 MW GUJARAT S ENEGEN LTD THERMAL-GAS 35130 22276 51300
GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 21978 51800
AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 13929 26100
KORBA TPS EAST CSPGCL THERMAL-COAL 44000 198673 33880
DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 365808 27570
KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 316500 30420
HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 532878 19410
CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 515 58300
MTTPS CHAMPA U-I CSPGCL THERMAL-COAL 50000 220376 39000
MTTPS CHAMPA U-II CSPGCL THERMAL-COAL 50000 23709 10000
SHP GANGREL CSPGCL HYDRO-HYDRO 1000 2350 36790
BANGO HEP CSPGCL HYDRO-HYDRO 12000 14662 8900
MHP KORBA WEST CSPGCL HYDRO-HYDRO 170 859 38190
SIKASAR HEP CSPGCL HYDRO-HYDRO 700 418 26870
DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8843 74500
DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 19446 51500
GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 66388 71600
GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127488 41300
KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 96072 43900
KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 29841 56400
SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 184966 58800
UKAI 1-5 GSECL THERMAL-COAL 85000 204891 46900
UKAI TPS 6 GSECL THERMAL-COAL 50000 284448 48200
WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 271999 58300
WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 82808 44100
KADANA HPS GSECL HYDRO-HYDRO 24200 34433 16800
UKAI HPS GSECL HYDRO-HYDRO 30500 40585 6100
TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 123000 11500
BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 8900 10900
BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 7200 27500
JHINNA HPS MPPGCL HYDRO-HYDRO 2000 9700 18500
RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 44300 3400
GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 17300 4600
SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 4100 16900
MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 14600 27000
PENCH HPS MPPGCL HYDRO-HYDRO 16000 23700 8100
RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 3000 16900
AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 134400 35100
SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 283800 38700
SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 344600 34300
SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 111600 61600
SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 211800 58000
SSTPS PH-I MPPGCL THERMAL-COAL 120000 233100 84300
BHUSAWAL TPS MSPGCL THERMAL-COAL 142000 566258 51100
CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1365682 33700
KHAPERKHEDA MSPGCL THERMAL-COAL 134000 706207 39100
KORADI TPS MSPGCL THERMAL-COAL 62000 443206 42000
NASIK TPS MSPGCL THERMAL-COAL 63000 297275 47000
PARLI TPS MSPGCL THERMAL-COAL 113000 175934 71600
PARAS MSPGCL THERMAL-COAL 50000 267931 38700
URAN CCPP MSPGCL THERMAL-GAS 67200 320330 30600
KOYANA MSPGCL HYDRO-HYDRO 195600 328155 13100
SMALL HYDRO POWER PLANTS MSPGCL HYDRO-HYDRO 45400 93062 30500
BHIRA MSPGCL HYDRO-HYDRO 8000 10046 8400
TILLARI MSPGCL HYDRO-HYDRO 8900 10584 3100
SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 233298 20500
SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 87633 20500
PRIVATE SECTOR
Page 36
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 81282 46750
JNSTPP(JAYPEE NIGRIE) JP POWER VENTURES LTD THERMAL-COAL 132000 726695 29310
MB POWER MB POWER THERMAL-COAL 120000 345632 38310
ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 754922 28671
ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 780761 23495
ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 198000 1263784 32090
ADANI POWER MAHARA ADANI POWER LTD THERMAL-COAL 330000 1666191 34124
AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 170065 36827
SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 252035 45129
ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 458551 36000
ESSAR POWER MP LTD ESSAR POWER MP LTD THERMAL-COAL 60000 243040 28600
VEDANTA LTD (P P -I) VEDANTA LTD THERMAL-GAS 3000 15044 24000
VEDANTA LTD (P P -II) VEDANTA LTD THERMAL-GAS 3000 21293 24000
PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 8234600 24000
165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 5850 64390
145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 68717 40349
SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 132655 28776
SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 144686 38567
MUNDRA UMPPCOASTAL GUJARAT POWER
LTD THERMAL-IMP COAL 400000 2530300
23900
LANCO AMARKANTAK TPP PATHADIH
U-ILANCO AMARKAN POWER LTD THERMAL-COAL 30000 195500
29200
LANCO AMARKANTAK TPP PATHADIH
U-IILANCO AMARKAN POWER LTD THERMAL-COAL 30000 206900
27600
BARADARHA TPS D B POWER LTD THERMAL-COAL 120000 677373 29200
JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 405000 28900
JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 453000 40500
DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 339437 40700
TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 293400 44000
TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 137200 37000
TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 174900 44000
BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 92900 14100
BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23700 34300
KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 27600 48300
CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2530300 23900
BHANDARDRA HEP -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 2475 54900
SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 161400 26500
SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 445000 39000
SOTHERN REGION
CENTRAL SECTOR
NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 325699 54820
NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 305532 39880
NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 998805 38510
NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 113016 54070
NEYVELI TAMILNADU POWER LTD JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 625274 42200
VALLUR TPS NTPC TECL THERMAL-COAL 150000 856438 42350
R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 1493 84300
RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1502919 29400
RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 341291 31800
SIMHADRI I NTPC LTD THERMAL-COAL 100000 688382 36800
SIMHADRI II NTPC LTD THERMAL-COAL 100000 663657 43400
KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 593110 31324
MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 291625 21764
KKNPP-1 amp 2 NPCIL NUCLEAR-NUCLEAR 200000 572609 40948
MINICOY LAKSHADEEP THERMAL-DIESEL 340 770 29600
KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1097 29600
AMINI LAKSHADEEP THERMAL-DIESEL 265 509 29600
ANDROTT LAKSHADEEP THERMAL-DIESEL 219 524 29600
KALPENI LAKSHADEEP THERMAL-DIESEL 175 356 29600
AGATTI LAKSHADEEP THERMAL-DIESEL 195 658 29600
KADMAT LAKSHADEEP THERMAL-DIESEL 190 414 29600
KILTAN LAKSHADEEP THERMAL-DIESEL 150 269 29600
CHETLET LAKSHADEEP THERMAL-DIESEL 100 139 29600
BITRA LAKSHADEEP THERMAL-DIESEL 043 024 29600
BANGARAM LAKSHADEEP THERMAL-DIESEL 018 009 29600
Page 37
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) STATE SECTOR
Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 721811 46500
Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 50000 336142 46500
RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 237358 46500
RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 239926 46500
RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 124500 46500
SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 62109 46500
UPPER SILERU APGENCO HYDRO-HYDRO 24000 33000 46500
LOWER SILERU APGENCO HYDRO-HYDRO 46000 81066 46500
DONKARAI APGENCO HYDRO-HYDRO 2500 6007 46500
PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 1262 46500
CHETTIPETA APGENCO HYDRO-HYDRO 100 214 46500
MUCHKUND APGENCO HYDRO-HYDRO 12000 37571 46500
NAGARJUNASAGAR RCPH APGENCO HYDRO-HYDRO 9000 606 46500
TUNGABHADRA HES amp HAMPI(AP
Share)
APGENCO HYDRO-HYDRO 7200 6100 46500
KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 352232 42600
KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 288131 32500
KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 319272 46500
RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 40073 44300
KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 308317 46000
KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 308963 51300
SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 61004 76600
NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 17960 75300
PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 20873 58300
POCHAMPAD-I TSPGENCO HYDRO-HYDRO 2700 5455 29800
POCHAMPAD-II TSPGENCO HYDRO-HYDRO 900 1932 40700
NIZAMSAGAR TSPGENCO HYDRO-HYDRO 1000 1126 53400
RAICHUR TPS 1 to 7 KPCL THERMAL-COAL 147000 890866 43800
RAICHUR TPS 8 KPCL THERMAL-COAL 25000 159523 48200
BELLARI TPS 1 KPCL THERMAL-COAL 50000 318679 51100
BELLARI TPS 2 KPCL THERMAL-COAL 50000 232347 55600
BELLARI TPS 3 KPCL THERMAL-COAL 70000 47565 34400
BHADRA PH KPCL HYDRO-HYDRO 3920 2369 45900
GERUSUPPA PH KPCL HYDRO-HYDRO 24000 26990 22000
GHAT PRABHA HEP KPCL HYDRO-HYDRO 3200 4777 25300
KADRA HPS KPCL HYDRO-HYDRO 15000 16889 26800
NAGJHARI KPCL HYDRO-HYDRO 90000 155159 9800
KODASALLI DPH KPCL HYDRO-HYDRO 12000 14854 19200
MUNIRA+MGH+SPH+SPH KPCL HYDRO-HYDRO 22640 48211 7900
SHARAVATHY HPS KPCL HYDRO-HYDRO 108550 276215 5400
ALMATTI DPH KPCL HYDRO-HYDRO 29000 39611 24600
VARAHI UGPH KPCL HYDRO-HYDRO 46000 71368 15600
IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 17196 15300
IDUKKI HPS KSEB HYDRO-HYDRO 78000 137905 15300
KAKKAD HPS KSEB HYDRO-HYDRO 5000 13063 15300
KALLADA HPS KSEB HYDRO-HYDRO 1500 4436 15300
KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 46544 15300
KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 635 15300
LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 30822 15300
MALANKARA HPS KSEB HYDRO-HYDRO 1050 2474 15300
MATTUPETTY KSEB HYDRO-HYDRO 200 230 15300
MALAMPUZHA KSEB HYDRO-HYDRO 250 063 15300
CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 864 15300
URUMI ST I amp II KSEB HYDRO-HYDRO 615 903 15300
LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 248 15300
NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7765 19625 15300
PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 16601 15300
PANNIAR HPS KSEB HYDRO-HYDRO 3240 6217 15300
PORINGALKUTHU KSEB HYDRO-HYDRO 3600 10052 15300
PORINGALKUTHU LBE KSEB HYDRO-HYDRO 1600 9438 15300
PEPPARA KSEB HYDRO-HYDRO 300 395 15300
POOZHITHODE KSEB HYDRO-HYDRO 480 1045 15300
Page 38
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) PEECHI KSEB HYDRO-HYDRO 125 040 15300
RANI-PERUNADU KSEB HYDRO-HYDRO 400 585 15300
SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 79783 15300
SENGULAM HPS KSEB HYDRO-HYDRO 5120 11558 15300
SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 16711 15300
VILANGAD KSEB HYDRO-HYDRO 750 1578 15300
BARAPOLE KSEB HYDRO-HYDRO 1500 1932 15300
VELLATHOOVAL KSEB HYDRO-HYDRO 360 305 15300
CHIM0NY KSEB HYDRO-HYDRO 250 156 15300
ADYANPARA KSEB HYDRO-HYDRO 350 501 15300
BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 554 15300
KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 3801 15300
KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 23132 32800
ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 14416 62280
METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 523970 62280
METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 321270 62280
NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 336575 62280
NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 591240 62280
TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 508966 62280
KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 30897 62280
VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 18720 90699 62280
KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 33593 62280
BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 1047 62280
PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 1250 62280
PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 330 62280
MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 4897 62280
MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 032 62280
KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15681 62280
KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 40608 62280
KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 21342 62280
KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 4717 62280
KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4322 62280
KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2399 62280
METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 4416 62280
METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 8035 62280
BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2187 62280
BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2359 62280
BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2511 62280
BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 1949 62280
BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 1819 62280
POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 172 62280
SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 241 62280
MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 026 62280
THIRUMOORTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 136 62280
PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 9309 62280
VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 353 62280
SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 4192 62280
PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 6571 62280
SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 1186 62280
SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6319 62280
ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 6122 62280
KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 28674 62280
SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 18381 62280
SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 4258 62280
KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 12680 62280
KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4201 62280
ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 000 62280
PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 19175 62280
AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 078 62280
BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 504 62280
BHAVANI KATTALAI (BKB)(IIIampIII BB I amp II)TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 5847 62280
PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 000 62280
Page 39
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) SRI DAMODARAM STPS APPDCL THERMAL-COAL 160000 808108 36300
PRIVATE SECTOR
KARUPPUR TANJORE LANCO TANJORE PCL THERMAL-GAS 12000 48096 28770
SIMHAPURI ENERGY LTD SIMHAPURI ENERGY LTD THERMAL-COAL 60000 143900 39100
JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 7111 45500
SBU 1 JSW ENERGY LTD
VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 26000 159100
43300
SBU 2 JSW ENERGY LTD
VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 60000 247900
42800
LANCO KPLLANCO KONDAPALLI POWER
LTDTHERMAL-GAS 36814 85060
25776
LANCO KPL STG -IILANCO KONDAPALLI POWER
LTDTHERMAL-GAS 36600 12979
46330
LANCO KPL STG -IIIALANCO KONDAPALLI POWER
LTDTHERMAL-GAS 37100 85710
46330
LANCO KPL STG -III BLANCO KONDAPALLI POWER
LTDTHERMAL-GAS 37100 43639
46330
HINDUJA NATIONAL PCL HINDUJA NATIONAL PCL THERMAL-COAL 104000 303000 38200
MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 121164 49940
UDUPI POWER COR LTD ADANI POWER LTD THERMAL-COAL 120000 754613 42500
SPECTRUM POWER GENERATION
LTD SPECTRUM PG LTD THERMAL-GASN 20525 9256812
34952
TAQA NEYVELI POWER COM PVT
LTD TAQA NEYVELI THERMAL-LIG 25000 5840
34500
ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 251000 51000
ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 207860 36800
GMR VEMAGIRI POWER GENERATION
LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 30117
46450
EASTERN REGION
CENTRAL SECTOR
MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 64675 53113
MTPS STAGE - II KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 39000 1432 69138
BOKARO `B` TPS DVC THERMAL-COAL 63000 145670 31539
MEJIA TPS U 1-3 DVC THERMAL-COAL 63000 348298 31552
MEJIA TPS U 4 DVC THERMAL-COAL 21000 116099 34997
MEJIA TPS U 5-6 DVC THERMAL-COAL 50000 276427 35976
MEJIA TPS U 7-8 DVC THERMAL-COAL 100000 552854 36991
DURGAPUR STEEL TPS DVC THERMAL-COAL 100000 665550 39323
DURGAPUR TPS DVC THERMAL-COAL 21000 59270 35416
RAGHUNATHPUR TPS DVC THERMAL-COAL 120000 201650 35326
MAITHON HYDEL STA DVC HYDRO-HYDRO 6320 12200 17984
CHANDRAPURA TPSU1-3 DVC THERMAL-COAL 42000 257610 35095
CHANDRAPURA TPSU7-8 DVC THERMAL-COAL 50000 306673 34987
KODERMA TPS DVC THERMAL-COAL 100000 380180 38131
PANCHET HPS DVC HYDRO-HYDRO 8000 13360 17984
TILLAYA HPS DVC HYDRO-HYDRO 400 1410 17984
RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34700 35400
TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 277300 23200
TLDP -III NHPC LTD HYDRO-HYDRO 13200 55400 62000
TLDP -IV NHPC LTD HYDRO-HYDRO 16000 60300 25600
FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 957219 33700
FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 308943 41000
BONGAINGAON TPS NTPC LTD THERMAL-COAL 25000 153663 58600
KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 542277 34200
KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 942591 34200
BARH-II NTPC LTD THERMAL-COAL 132000 728021 44500
TALCHER TPS NTPC LTD THERMAL-COAL 46000 335521 30100
TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 702319 25600
TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1436521 24700
STATE SECTOR
BTPS(RampM) BIHAR STATE PGCL THERMAL-COAL 22000 12142 39700
BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 98331 10602
HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 50593 9482
CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 19689 2605
RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 53192 6033
UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 147208 14637
Page 40
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 60353 4519
IB TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 288567 25000
J P H GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 210 038 61100
MEYONG CHU GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 400 1086 61100
TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 122667 38200
DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 214339 43321
KOLAGHAT THERMAL POWER
STATION
WEST BENGAL PDCL THERMAL-COAL 126000 538269 31603
BAKRESHWAR THERMAL POWER
PLANT
WEST BENGAL PDCL THERMAL-COAL 105000 634876 32154
BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 45000 166855 33299
SANTHALDIH THERMAL POWER
STATION
WEST BENGAL PDCL THERMAL-COAL 50000 336442 34932
SAGARDIGHI THERMAL POWER
PROJECT
WEST BENGAL PDCL THERMAL-COAL 160000 423121 34705
JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 20344 68900
RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 24559 68900
TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 4623 68900
PURULIA PUMPED STORAGE
PROJECT
WEST BENGAL SEDCL HYDRO-HYDRO 90000 108816 68900
MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2768 68900
PRIVATE SECTOR
CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 49474 20230
CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 555500 70200
HALDIA ENERGY HALDIA ENERGY LTD THERMAL-COAL 60000 371000 50400
DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3688 63400
KAMALANGA TPS GMR KAMALANGA ENERGY LTD THERMAL-COAL 105000547670
33300
ADHUNIK POWER U-1 ADHUNIK POWER THERMAL-COAL 27000 158 44060
ADHUNIK POWER U-2 ADHUNIK POWER THERMAL-COAL 27000 168 44250
VL-JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 332800 23622
JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 43000 45250
JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 71700 37030
JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 70700 35920
JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 71100 38870
JOJOBERA UNIT 5 TATA POWER COM LTD THERMAL-COAL 12000 79300 44560
JOJOBERA UNIT 6 TATA POWER COM LTD THERMAL-WHR 12000 83700 12840
IEL KALINGANAGAR U-I TATA POWER COM LTD THERMAL-WG 6750 33400 22500
IEL KALINGANAGAR U-II TATA POWER COM LTD THERMAL-WG 6750 34800 22500
MAITHON UNIT 1 amp 2 TATA POWER COM LTD THERMAL-COAL 105000 678000 36100
HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 27500 24340
HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 28400 24340
HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 15800 24310
NORTH EASTERN REGION
CENTRAL SECTOR
LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 74100 36600
AGARTALA GT NEEPCO THERMAL-GAS 13500 88611 27210
ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 153111 32310
DOYANG HEP NEEPCO HYDRO-HYDRO 7500 25598 49801
KOPILI HEP NEEPCO HYDRO-HYDRO 20000 98186 11491
KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 19582 20237
KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 10310 17968
RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 124093 22945
TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 10100 17344 39000
STATE SECTOR
HYDRO POWER (122 Stns) ITANAGAR GOVT OF ARUNACHAL
PRADESHHYDRO-HYDRO 6971 6217270
24600
KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39514 17337
LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 82327 36810
NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 33318 48290
MYNTRIANG SHEP ST II ASSAM POWER GENCO HYDRO-HYDRO 300 567 35776
LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 9130 49200
LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 012 49200
DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 022 49200
TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 000 49200
UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 4990 16000
UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 6476 37000
UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 16494 14600
UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 3600 9556 15000
SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 758 8000
MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44070 44800
KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 154 41400
TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 091 41400
MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 411 41400
MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 394 41400
KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 760 41400
SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 3264 41400
LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 044 41400
BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 18953 28000
ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 43585 28200
GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 4080 11100
Note
LIG Lignite N Naptha WHR Waste Heat Recovery
Page 41
1 Executive summary of Target and Achievement of Substations during 2019-2020 As on 30-04-19
(All figures in circuit MVA)
Ce
ntr
al S
ecto
r
Sta
te S
ecto
r
JV
Pri
va
te S
ecto
r
To
tal
Ce
ntr
al S
ecto
r
Sta
te S
ecto
r
JV
Pri
va
te S
ecto
r
To
tal
Ce
ntr
al S
ecto
r
Sta
te S
ecto
r
JV
Pri
va
te S
ecto
r
To
tal
Ce
ntr
al S
ecto
r
Sta
te S
ecto
r
JV
Pri
va
te S
ecto
r
To
tal
Ce
ntr
al S
ecto
r
Sta
te S
ecto
r
JV
Pri
va
te S
ecto
r
To
tal
Ce
ntr
al S
ec
tor
Sta
te S
ec
tor
JV
Pri
va
te S
ec
tor
Gra
nd
To
tal
3000 0 0 3000 0 0 0 0 18000 3000 6000 27000 5205 19665 4260 29130 800 21786 0 22586 27005 44451 10260 81716
Apr19 Programme 0 0 0 0 0 0 0 0 3000 0 3000 6000 0 1000 2000 3000 0 800 0 800 3000 1800 5000 9800
Achievement 0 0 0 0 0 0 0 0 500 0 0 500 815 1980 0 2795 0 1305 0 1305 1315 3285 0 4600
Upto Apr-19 Programme 0 0 0 0 0 0 0 0 3000 0 3000 6000 0 1000 2000 3000 0 800 0 800 3000 1800 5000 9800
Achievement 0 0 0 0 0 0 0 0 500 0 0 500 815 1980 0 2795 0 1305 0 1305 1315 3285 0 4600
21(1)
220 kV Grand Total 800 kV 500 kV
Programme 2019-20
Programme
Achievement
HVDC765 kV 400 kV
As on 30-04-19
Sl Voltage Ratio Capacity
No (kVkV) (MWMVA)
1 2 3 4 5
1 Bhadla SS (3x1500 3x500 MVA) 765400 PGCIL 500
2 Extn at Tumkur (Pavagada ) PS (2x500 MVA) 400220 PGCIL 500
3 Bongaigaon (2nd ICT) Ss 400220 PGCIL 315
Total of CENTRAL SECTOR 1315
4 Motiram Adda Gorakhpur (Aug) (Additional TF) 400220 UPPTCL 240
5 Muradnagar-II Ghaziabad (Aug) (Additional TF) 400220 UPPTCL 240
6 Noida Sec- 148 GBNagar (New) 400220 UPPTCL 5007 Sarnath Varanasi (Aug) TF- II (500-315) 400220 UPPTCL 1858 Sarojininagar Lucknow Aug) TF- II (500-315) 400220 UPPTCL 185
9 Unnao (Aug) TF-III 400220 UPPTCL 31510 Nawada SS 400220 HVPNL 31511 Kharepatan SS 22033 MSETCL 2512 Prathipadu SS 220132 APTRANSCO 10013 Pali Ss 22066 HVPNL 160
14 A-5 Faridabad Ss 22066 HVPNL 60
15 Rentachintala Ss Aug(3X100-2x100) 220132 APTRANSCO 10016 Amethi Ss 220132 UPPTCL 160
17 Gajokhar Varanasi (Aug) TF- II (160-100) 220132 UPPTCL 60
18 Gola Gorakhpur (New) 220132 UPPTCL 160
19 Khurja Bulandshahr (Aug) TF- II (200-160) 220132 UPPTCL 40
20 RC Green GB Nagar (Aug) TF-II (160-100) 220132 UPPTCL 60
21 Sikandrabad Bulandshahr (Aug) (Additional TF) 220132 UPPTCL 160
22 Sitapur (Aug) (Additional TF) 220132 UPPTCL 160
23 Sohawal Ayodhya (Aug) TF-II (160-100) 220132 UPPTCL 60
TOTAL STATE SECTOR 3285
GRAND TOTAL 4600
21(2)
CENTRAL SECTOR
STATE SECTOR
2Sub-Stations (220 kV and above) CommissionedReady for commissioning During Apr-2019
Name of Sub Stations Executing Agency
SN Contents Page
1 Electricity Generation (MU) Targets and Achievements for 2019-20 22
Section E - Electricity Generation
Programme Achievement Ach Programme Achievement Ach
Central Sector 37545100 3177900 3129530 9848 3177900 3129530 9848
State Sector 37498600 3322500 2950558 8881 3322500 2950558 8881
PvtIPP Sector 37346200 3236400 3195940 9875 3236400 3195940 9875
PvtUTL Sector 1823100 159300 165579 10394 159300 165579 10394
Total 114213000 9896100 9441607 9541 9896100 9441607 9541
Central Sector 5661700 386100 481390 12468 386100 481390 12468
State Sector 6680500 498200 536514 10769 498200 536514 10769
PvtIPP Sector 1206900 57300 80405 14032 57300 80405 14032
PvtUTL Sector 144100 12300 10930 8886 12300 10930 8886
Total 13693200 953900 1109239 11628 953900 1109239 11628
Central Sector 4472000 367300 317765 8651 367300 317765 8651
Total 4472000 367300 317765 8651 367300 317765 8651
Bhutan Import 621800 17500 24396 13941 17500 24396 13941
Central Sector 47678800 3931300 3928685 9993 3931300 3928685 9993
State Sector 44179100 3820700 3487072 9127 3820700 3487072 9127
Pvt Sector 40520300 3465300 3452854 9964 3465300 3452854 9964
Total 133000000 11234800 10893007 9696 11234800 10893007 9696
Provisional based on actual-cum-Assesment
Figs in MU
Cummulative
Achievement
Cummulative
Achievement
Mar-19 Mar-18 Upto Mar-2019 Upto Mar-2018
984785 869291 12675910 10183949
22
1 Electricity Generation (MU) Targets and Achievememts for 2019-20
All India Energy Generation During Apr-19 to Apr-19 (MU)
Target (2019-20)Apr-19 to Apr-19
Sector
Hydro
Thermal
Nuclear
Renewable Energy Generation
Achievement
Apr-2019
98961
95393673
112348
94416
11092
3178
108930
0
20000
40000
60000
80000
100000
120000
Thermal Hydro Nuclear Total
Programme
Achievement
SN Contents Page
1 Energy Power Supply Position (Provisional) for Apr-2019 and during Apr-19 to Apr-19 23
2 Peak Power Supply Position (Provisional) for Apr-2019 and during Apr-19 to Apr-19 24
3 Energy Power Supply Position (Revised) for Mar-2019 and during Apr-19 to Mar-19 25
4 Peak Power Supply Position (Revised) for Mar-2019 and during Apr-19 to Mar-19 26
5 Notified Power cuts Restrictions on Industries during Apr-2019 27
6 Power Supply to Agricultural Sector during Apr-2019 28
Section F - Power supply position
आकड़ मममलयन यननट नट Figures in MU net
ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied
कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )
चडीगढ़ Chandigarh 117 117 0 00 117 117 0 00
दिलली Delhi 2698 2698 1 00 2698 2698 1 00
हरियजणज Haryana 3773 3773 0 00 3773 3773 0 00
दहमजचल परिश Himachal Pradesh 777 777 0 00 777 777 0 00
रमम कशमीि Jammu amp Kashmir 1604 1296 308 192 1604 1296 308 192
परजब Punjab 3646 3646 0 00 3646 3646 0 00
िजरसथजन Rajasthan 6210 6208 2 00 6210 6208 2 00
उतति परिश Uttar Pradesh 10179 10148 32 03 10179 10148 32 03
उततिजखड Uttarakhand 1120 1120 0 00 1120 1120 0 00
उततरी कषतर Northern Region 30094 29786 308 10 30094 29786 308 10
छततीसगढ़ Chhattisgarh 2684 2676 8 03 2684 2676 8 03
गरिजत Gujarat 10718 10718 0 00 10718 10718 0 00
मधय परिश Madhya Pradesh 6006 6006 0 00 6006 6006 0 00
महजिजषटर Maharashtra 14308 14308 0 00 14308 14308 0 00
िमन औि दिउ Daman amp Diu 220 220 0 00 220 220 0 00
िजिि व नगि हवली Dadra amp Nagar Haveli 552 552 0 00 552 552 0 00
गोवज Goa 388 388 0 00 388 388 0 00
पशचिमी कषतर Western Region 34875 34868 8 00 34875 34868 8 00
आनधर परिश Andhra Pradesh 5708 5708 0 00 5708 5708 0 00
तलगजनज Telangana 5725 5725 0 00 5725 5725 0 00
कनजाटक Karnataka 7003 7003 0 00 7003 7003 0 00
किल Kerala 2402 2400 2 01 2402 2400 2 01
तममल नजड Tamil Nadu 10010 10010 0 00 10010 10010 0 00
पडचिी Puducherry 263 263 0 00 263 263 0 00
लकष-दवीप Lakshadweep 4 4 0 0 4 4 0 0
दकषकषणी कषतर Southern Region 31111 31109 2 00 31111 31109 2 00
बबहजि Bihar 2589 2589 0 00 2589 2589 0 00
िजमोिि घजटी ननगम DVC 1772 1772 0 00 1772 1772 0 00
झजिखणड Jharkhand 689 689 0 00 689 689 0 00
ओडडशज Odisha 2689 2689 1 00 2689 2689 1 00
पशशचम बगजल West Bengal 5075 5075 0 00 5075 5075 0 00
मसशककम Sikkim 37 37 0 00 37 37 0 00
अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 7 29 27 2 7
परवी कषतर Eastern Region 12851 12850 1 00 12851 12850 1 00
अरणजचल परिश Arunachal Pradesh 66 66 0 05 66 66 0 05
असम Assam 766 709 57 75 766 709 57 75
मणणपि Manipur 68 67 1 15 68 67 1 15
मघजलय Meghalaya 170 160 10 59 170 160 10 59
ममज़ोिम Mizoram 54 53 0 08 54 53 0 08
नजगजलड Nagaland 54 54 0 08 54 54 0 08
बिपिज Tripura 122 120 1 12 122 120 1 12
उततर-परवी कषतर North-Eastern Region 1300 1228 71 55 1300 1228 71 55
समपणण भारत All India 110231 109842 389 04 110231 109842 389 04
23
ऊरजा पनत ा म कमी ऊरजा पनत ा म कमीEnergy not Supplied
Excludes energy exported to Bangladesh
Energy not Supplied
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
ऊराण वरवदयत आपरत ण शथिरत ररपोरण (परवाणरवलोकन) Energy Power Supply Position Report (Provisional)
राजयState
अपरल 2019 April2019 अपरल2019 -अपरल2019 April2019 to April2019
अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met
कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )
चडीगढ़ Chandigarh 256 256 0 00 256 256 0 00
दिलली Delhi 5664 5664 0 00 5664 5664 0 00
हरियजणज Haryana 8127 8127 0 00 8127 8127 0 00
दहमजचल परिश Himachal Pradesh 1387 1387 0 00 1387 1387 0 00
रमम कशमीि Jammu amp Kashmir 2826 2261 565 200 2826 2261 565 200
परजब Punjab 7015 7015 0 00 7015 7015 0 00
िजरसथजन Rajasthan 10560 10560 0 00 10560 10560 0 00
उतति परिश Uttar Pradesh 19935 19935 0 00 19935 19935 0 00
उततिजखड Uttarakhand 1922 1922 0 00 1922 1922 0 00
उततरी कषतर Northern Region 54476 53985 491 09 54476 53985 491 09
छततीसगढ़ Chhattisgarh 4596 4574 22 05 4596 4574 22 05
गरिजत Gujarat 17871 17865 6 00 17871 17865 6 00
मधय परिश Madhya Pradesh 10018 10018 0 00 10018 10018 0 00
महजिजषटर Maharashtra 23158 23150 8 00 23158 23150 8 00
िमन औि दिउ Daman amp Diu 341 340 1 02 341 340 1 02
िजिि व नगि हवली Dadra amp Nagar Haveli 818 818 0 00 818 818 0 00
गोवज Goa 594 594 0 00 594 594 0 00
पशचिमी कषतर Western Region 56242 56222 20 00 56242 56222 20 00
आनधर परिश Andhra Pradesh 9151 9151 0 00 9151 9151 0 00
तलगजनज Telangana 10191 10191 0 00 10191 10191 0 00
कनजाटक Karnataka 12681 12681 0 00 12681 12681 0 00
किल Kerala 4309 4300 8 02 4309 4300 8 02
तममल नजड Tamil Nadu 15972 15972 0 00 15972 15972 0 00
पडचिी Puducherry 482 480 2 05 482 480 2 05
लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0
दकषकषणी कषतर Southern Region 49155 49103 52 01 49155 49103 52 01
बबहजि Bihar 5357 5357 0 00 5357 5357 0 00
िजमोिि घजटी ननगम DVC 3039 3039 0 00 3039 3039 0 00
झजिखणड Jharkhand 1266 1266 0 00 1266 1266 0 00
ओडडशज Odisha 5389 5389 0 00 5389 5389 0 00
पशशचम बगजल West Bengal 8666 8666 0 00 8666 8666 0 00
मसशककम Sikkim 100 100 0 00 100 100 0 00
अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7
परवी कषतर Eastern Region 23349 23349 0 00 23349 23349 0 00
अरणजचल परिश Arunachal Pradesh 139 136 3 22 139 136 3 22
असम Assam 1712 1667 45 26 1712 1667 45 26
मणणपि Manipur 197 188 9 46 197 188 9 46
मघजलय Meghalaya 336 336 0 00 336 336 0 00
ममज़ोिम Mizoram 116 113 3 26 116 113 3 26
नजगजलड Nagaland 157 131 26 166 157 131 26 166
बिपिज Tripura 292 291 1 03 292 291 1 03
उततर-परवी कषतर North-Eastern Region 2848 2780 68 24 2848 2780 68 24
समपणण भारत All India 177411 176810 601 03 177411 176810 601 03
24
मजग की पनत ा म कमी Demand not Met
Excludes the supply to Bangladesh
राजयStateअपरल 2019 April2019
मजग की पनत ा म कमी Demand not Met
अधिकतम वरवदयत आपरत ण शथिरत ररपोरण (परवाणरवलोकन) Peak Power Supply Position Report (Provisional)
आकड़ मगज वजट नट Figures in MW netअपरल2019 -अपरल2019 April2019 to April2019
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
आकड़ मममलयन यननट नट Figures in MU net
ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied
कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )
चडीगढ़ Chandigarh 96 96 0 00 1561 1561 0 00
दिलली Delhi 1931 1930 1 00 32299 32282 17 01
हरियजणज Haryana 3658 3658 0 00 53665 53665 0 00
दहमजचल परिश Himachal Pradesh 832 830 2 02 9850 9618 232 24
रमम कशमीि Jammu amp Kashmir 1767 1414 353 200 19593 15868 3725 190
परजब Punjab 3585 3585 0 00 55288 55275 13 00
िजरसथजन Rajasthan 6774 6770 4 01 79826 79637 189 02
उतति परिश Uttar Pradesh 8754 8691 63 07 117101 116118 984 08
उततिजखड Uttarakhand 1067 1067 0 00 13845 13753 92 07
उततरी कषतर Northern Region 28464 28041 423 15 383028 377776 5251 14
छततीसगढ़ Chhattisgarh 2464 2457 8 03 26130 26076 54 02
गरिजत Gujarat 9890 9890 0 00 116588 116572 15 00
मधय परिश Madhya Pradesh 6236 6236 0 00 75667 75665 2 00
महजिजषटर Maharashtra 13631 13631 0 00 158285 158148 137 01
िमन औि दिउ Daman amp Diu 221 221 0 00 2557 2557 0 00
िजिि व नगि हवली Dadra amp Nagar Haveli 553 553 0 00 6317 6317 0 00
गोवज Goa 362 362 0 00 4283 4280 3 01
पशचिमी कषतर Western Region 33357 33349 8 00 389827 389615 212 01
आनधर परिश Andhra Pradesh 6072 6071 1 00 63735 63677 58 01
तलगजनज Telangana 6930 6929 1 00 66697 66635 62 01
कनजाटक Karnataka 7614 7612 1 00 71759 71690 69 01
किल Kerala 2489 2488 1 00 25029 24911 118 05
तममल नजड Tamil Nadu 10247 10245 2 00 109375 109273 102 01
पडचिी Puducherry 252 251 1 04 2761 2751 10 03
लकष-दवीप Lakshadweep 4 4 0 0 46 46 0 0
दकषकषणी कषतर Southern Region 33605 33597 8 00 339355 338938 417 01
बबहजि Bihar 2319 2318 1 00 30052 29827 225 07
िजमोिि घजटी ननगम DVC 1773 1772 1 00 22365 21995 369 17
झजिखणड Jharkhand 698 697 1 01 8682 8461 221 25
ओडडशज Odisha 2583 2582 1 00 31810 31781 30 01
पशशचम बगजल West Bengal 4585 4584 2 00 52237 52078 159 03
मसशककम Sikkim 41 41 0 00 513 512 0 01
अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 67 346 323 23 67
परवी कषतर Eastern Region 11999 11995 5 00 145658 144654 1004 07
अरणजचल परिश Arunachal Pradesh 61 60 0 06 864 855 9 10
असम Assam 680 656 23 34 9532 9204 328 34
मणणपि Manipur 68 68 1 09 916 906 10 11
मघजलय Meghalaya 173 173 0 03 1955 1953 1 01
ममज़ोिम Mizoram 50 49 0 09 668 661 8 12
नजगजलड Nagaland 58 57 1 20 902 809 93 103
बिपिज Tripura 150 150 0 00 1859 1837 21 11
उततर-परवी कषतर North-Eastern Region 1240 1214 26 21 16696 16225 471 28
समपणण भारत All India 108665 108196 469 04 1274564 1267209 7355 06
Note The revised data for March 2019 is not avaliable
Excludes energy exported to Bangladesh
राजयState
ऊराण वरवदयत आपरत ण शथिरत ररपोरण (परवाणरवलोकन) Energy Power Supply Position Report (Provisional)
25
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
Energy not Supplied Energy not Supplied
मािण2019 March2019 अपरल2018 -मािण2019 April2018 to March2019
ऊरजा पनत ा म कमी ऊरजा पनत ा म कमी
अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met
कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )
चडीगढ़ Chandigarh 223 223 0 00 369 369 0 00
दिलली Delhi 4016 4016 0 00 7016 7016 0 00
हरियजणज Haryana 6544 6544 0 00 10270 10270 0 00
दहमजचल परिश Himachal Pradesh 1683 1683 0 00 1700 1700 0 00
रमम कशमीि Jammu amp Kashmir 3277 2622 655 200 3277 2622 655 200
परजब Punjab 6564 6564 0 00 12638 12638 0 00
िजरसथजन Rajasthan 11885 11885 0 00 13276 13276 0 00
उतति परिश Uttar Pradesh 16220 16220 0 00 20498 20062 436 21
उततिजखड Uttarakhand 2002 2002 0 00 2216 2216 0 00
उततरी कषतर Northern Region 47925 47356 569 12 63166 61726 1440 23
छततीसगढ़ Chhattisgarh 4444 4128 316 71 4444 4270 174 39
गरिजत Gujarat 16263 16263 0 00 17053 16963 90 05
मधय परिश Madhya Pradesh 12328 12323 5 00 13815 13815 0 00
महजिजषटर Maharashtra 22361 22291 70 03 23864 23254 610 26
िमन औि दिउ Daman amp Diu 336 336 0 01 357 356 1 02
िजिि व नगि हवली Dadra amp Nagar Haveli 800 799 1 01 816 815 1 01
गोवज Goa 538 538 0 00 596 596 0 00
पशचिमी कषतर Western Region 53132 52965 167 03 56675 55821 853 15
आनधर परिश Andhra Pradesh 8977 8977 0 00 9459 9453 6 01
तलगजनज Telangana 10471 10471 0 00 10815 10815 0 00
कनजाटक Karnataka 12841 12841 0 00 12841 12841 0 00
किल Kerala 4264 4228 36 09 4264 4228 36 09
तममल नजड Tamil Nadu 15712 15712 0 00 15712 15712 0 00
पडचिी Puducherry 427 412 15 34 427 412 15 34
लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0
दकषकषणी कषतर Southern Region 49464 49464 0 00 49464 49464 0 00
बबहजि Bihar 4633 4633 0 00 5115 5084 31 06
िजमोिि घजटी ननगम DVC 3035 3035 0 00 3035 3035 0 00
झजिखणड Jharkhand 1210 1210 0 00 1339 1291 48 36
ओडडशज Odisha 4827 4827 0 00 5357 5357 0 00
पशशचम बगजल West Bengal 8287 8287 0 00 9130 9123 7 01
मसशककम Sikkim 100 100 0 00 106 106 0 00
अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7
परवी कषतर Eastern Region 21658 21658 0 00 23141 22733 408 18
अरणजचल परिश Arunachal Pradesh 133 131 2 15 138 138 0 01
असम Assam 1539 1508 31 20 1865 1809 56 30
मणणपि Manipur 204 199 5 25 219 216 3 12
मघजलय Meghalaya 357 357 0 00 374 372 1 04
ममज़ोिम Mizoram 108 105 3 28 121 119 2 17
नजगजलड Nagaland 127 125 2 16 156 138 18 116
बिपिज Tripura 249 249 0 00 298 293 5 17
उततर-परवी कषतर North-Eastern Region 2540 2535 5 02 2967 2850 117 39
समपणण भारत All India 169464 168745 719 04 177022 175528 1494 08
Note The revised data for March 2019 is not avaliable 26
अधिकतम वरवदयत आपरत ण शथिरत ररपोरण (परवाणरवलोकन) Peak Power Supply Position Report (Provisional)
आकड़ मगज वजट नट Figures in MW net
राजयStateमािण2019 March2019 अपरल2018 -मािण2019 April2018 to March2019
मजग की पनत ा म कमी मजग की पनत ा म कमी Demand not MetDemand not Met
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
Excludes the supply to Bangladesh
अपरल 2019 April2019 अपरल2018 -मािण2019 April2019 to April2019
उततरी कषतर Northern Region
चडीगढ़ Chandigarh(Data Not Received)दिलली Delhi
हरियजणज Haryana
दहमजचल परिश Himachal Pradeshरमम कशमीि Jammu amp Kashmir(Data
Not Received)परजब Punjab
िजरसथजन Rajasthanउतति परिश Uttar Pradesh
उततिजखड Uttarakhand
पशचिमी कषतर Western Region
छततीसगढ़ Chhattisgarh
Apr-Nov 2018- No cuts
Maximum Demand cut-58MW
Energy cut- 00020-00032 MUsday
गरिजत Gujarat
मधय परिश Madhya Pradesh
महजिजषटर Maharashtra
गोवज Goa
दकषकषणी कषतर Southern Region
आनधर परिश Andhra Pradesh
तलगजनज Telangana
कनजाटक Karnataka
किल Kerala
तममल नजड Tamil Nadu
पडचिी Puducherryपरवी कषतर Eastern Region
बबहजि Bihar
झजिखणड Jharkhand
ओडडशज Odisha
पशशचम बगजल West Bengal
No N
otifie
d Cu
ts
27
मािण 2019 म इडथरीर पर वरवदयत करौती का वरवरवरण Notified Power CutsRestrictions on Industries during April2019
राजय कषतर State Regionऊराणमाग करौती EnergyDemand Cut
No N
otifie
d Cu
tsNo
Notifie
d Cu
ts
अपरल2019 April 2019 अपरल2019 -अपरल2019 April2019 to April2019
उततरी कषतर Northern Region
चडीगढ़ Chandigarh Data not received Data not received
दिलली Delhi Data not received Data not received
हरियजणज Haryana 0811 hrsday 0811 hrsday
दहमजचल परिश Himachal Pradesh HPSEBL has only 2 agriculture consumers and uninterrupted
power is being supplied to agriculture sector
HPSEBL has only 2 agriculture consumers and uninterrupted
power is being supplied to agriculture sector
रमम कशमीि Jammu amp Kashmir Data not received Data not received
परजब Punjab 379 hrsday 379 hrsday
िजरसथजन Rajasthan 0630 hrsday 0630 hrsday
उतति परिश Uttar Pradesh 2157 hrsday 2157 hrsday
उततिजखड Uttarakhand 2359 hrsday 2359 hrsday
पशचिमी कषतर Western Region
छततीसगढ़ Chhattisgarh 18 hrsday 18 hrsday
गरिजत Gujarat 8 hrsday 8 hrsday
मधय परिश Madhya Pradesh Three-Phase Supply(Irrigation)- 0953 hrs day Three-Phase
(Mixed) Supply - 2334 hrs day
Three-Phase Supply(Irrigation)- 0953 hrs day Three-Phase
(Mixed) Supply - 2334 hrs day
महजिजषटर Maharashtra Three-Phase Supply(Irrigation)- 9 hrs day Three-Phase Supply(Irrigation)- 9 hrs day
गोवज Goa No restriction No restriction
दकषकषणी कषतर Southern Region
आनधर परिश Andhra Pradesh 07 hrsday 07 hrsday
तलगजनज Telangana 24 hrsday 24 hrsday
कनजाटक Karnataka 6 hrsday 6 hrsday
किल Kerala No Restrictions No Restrictions
तममल नजड Tamil Nadu 9 hrsday (6 hrs during day time and 3 hrs during night time) 9 hrsday (6 hrs during day time and 3 hrs during night time)
पडचिी Puducherry No Restrictions No Restrictions
परवी कषतर Eastern Region
बबहजि Bihar 18 hrsday 18 hrsday
झजिखणड Jharkhand 20 hrsday 20 hrsday
ओडडशज Odisha 24 hrsday 24 hrsday
पशशचम बगजल West Bengal 23 hrsday 23 hrsday
28
मारच 2019 कषि कषतर को षिदयत आपरतच का षििरण Power Supply to Agricultural Sector during March2019
राजय कषतर State Regionऔसत वरवदयत आपरत ण घनरो म Average Hours of Supply
On segregated feeders
SNo Contents Page
1 Growth of Installed Capacity since 6th Plan 29
2 Progress of Transmission Sector since 6th Plan 30
3 All India Yearly Coal consumption for Power Generation (Utilities)
4 All India Annual Per Capita Consumption of Electricity since -2006
5 Average cost of power supply amp Average realisation (Paisakwh)
6 Growth of Rural Electrification amp Pump Sets Energisation
7 Status of Hydro Schemes Cleared by the CEA in Apr-2019
Section G - Growth of Power Sector
31
32
(In MW)
Coal Gas Diesel Total
End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472
End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634
End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537
End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596
End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921
End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703
End of 12th Plan 19216288 2532938 83763 21832988 6780 4447842 50018 31960630
Up to Apr-2019 20070450 2493722 63763 22627934 678000 4539922 7764163 35610019
Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-17) = 51529 MW
Electricity Generation (MU) Targets and Achievements for 2016-17
Coal Gas Diesel Nuclear Hydro Res Total
2007045 2493722 637629 678000 453992 77641625 22925174
29
1 Growth of Installed Capacity Since 6th Plan
Plan YearThermal
Nuclear Hydro RES (MNRE) Total
2007045
2493722637629
678000
4539922
77641625
Total Installed Capacity 35610019 MW
Coal Gas Diesel Nuclear Hydro Res
Progress of Transmission Sector in the Country up to April 2019
1 TRANSMISSION LINES (All fig in CKM)
At the end of
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
6th plan 0 0 0 0 0 0 0 0 0 0 0 0 1831 4198 0 6029 1641 44364 0 46005 3472 48562 0 52034
7th plan 0 0 0 0 0 0 0 0 0 0 0 0 13068 6756 0 19824 4560 55071 0 59631 17628 61827 0 79455
8th plan 0 0 0 0 1634 0 0 1634 0 0 0 0 23001 13141 0 36142 6564 73036 0 79600 31199 86177 0 117376
9th plan 0 0 0 0 3234 1504 0 4738 751 409 0 1160 29345 20033 0 49378 8687 88306 0 96993 42017 110252 0 152269
10th plan 0 0 0 0 4368 1504 0 5872 1775 409 0 2184 48708 24730 0 73438 9444 105185 0 114629 64295 131828 0 196123
11th Plan 0 0 0 0 5948 1504 1980 9432 4839 411 0 5250 71023 30191 5605 106819 10140 125010 830 135980 91950 157116 8415 257481
12th Plan 6124 0 0 6124 5948 1504 1980 9432 25465 1177 4598 31240 92482 48240 17065 157787 11014 151276 978 163268 141033 202197 24621 367851
13th Plan (Up
to Mar2019)6124 0 0 6124 5948 1504 1980 9432 33692 1512 6605 41809 101335 58238 21173 180746 11734 162552 1010 175296 158833 223806 30768 413407
13th Plan (Up
to Apr-19)6124 0 0 6124 5948 1504 1980 9432 33745 1512 6605 41862 101335 58258 21173 180766 11734 162953 1010 175697 158886 224227 30768 413881
27150 600 MW of 132 kV Inter-Regional power transmission capacity links which are operated radially from time to time is not added in the total
75050
47900
24000
99050
30
Grand Total
Note - The figure upto the end of 10th plan in for stringing progress including the lines not commissioned Now only commissioned lines are reckoned Accordingly the figure for 10th plan (end) may read
as 187555 after adjusting with (-) 10852 Ckm
Inter-regional Power Transfer Capacity (MW)
plusmn 800 kV HVDC plusmn 500 kV HVDC 765 kV 400 kV 220 kV
IR addition in 12th
Plan (up to March
2017)
Inter-regional
Transmission
Capacity at the end
of Plan Period 2017-
22 (as on April19)
IR at the end of 11th
PlanIR at the end of 12th
Plan
IR Capacity Addition
at the end of Plan
Period 2017-22 (Till
April 19)
2004-05 27800
2005-06 28100
2006-07 30200
2007-08 33000
2008-09 35500
2009-10 36700
2010-11 38700
2011-12 41756
2012-13 45460
2013-14 48940
2014-15 53040
2015-16 54590
2016-17 57430
2017-18 60800
2018-19 62890
Year
2005-06
2006-07
2007-08
2008-09
2009-10
2010-11
2011-12
2012-13
2013-14
2014-15
2015-16
2016-17
2017-18
2018-19
2004-05 254 209 7568
2005-06 260 221 7636
2006-07 276 227 7423
2007-08 293 239 7727
2008-09 340 263 8713
2009-10 355 268 8870
2010-11 398 303 11975
2011-12 455 330 13514
2012-13 501 376 14867
2013-14 518 175
2014-15 520
Source- PFC Reports on the performance of State Power Utilities 31
1181
7335
7786
91441
8188
88363
957
1010
1075
1122
1149
(GrossGen+ Net Import) Mid-year population Provisional
5 Average cost of power supply amp average realization ( paiseKWH )
Yearcost of supply
(paiseunit)
Realization(paiseunit)
Including AgricultureOnly
Agriculture
6719
7171
3 All India yearly Coal Consumption for Power Generation (Utilities)
YEARCoal Consumption
Million Tonnes
4 All India Annual per Capita consumption of Electricity Since 2006
Per Capita Consumption ( kWh)
6314
Sl
NoExecuting Agency
Installed
Capacity (MW)Cost (Rs crore)
Date of
Clearance
32
Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as
Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received
from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made
available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified
villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is
independent of the earlier published reports
No Hydro Electric Project has been issued concurrenceAppraisal letter by CEA during April 2019
7 Status of Hydro Schemes Cleared by the CEA in Apr-2019
Name of Scheme
1999-002000-01
297594
010408 to 310309010409 to 310310
10th Plan
2005-062006-07
322968331020
6 Growth Of Rural Electrification amp Pumpsets Energisation
Plan Year
9th Plan2002-03
134092626
4111
Pump Sets Energised Villages Electricfied (Nos)
2001-02
284064367244
1218
27801997-981998-99
3207
482864
12632
1576036
4451722594
15455554
2314176
397343611750
2093311060316074
65109527813884
46708
18423975
499150
2003-042004-05
5743
9769
Cumu upto End of 10th Plan
010407 to 310308
010410 to 310311557976840909
010411 to 310312
412667
86293726
No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification
since 2004-05
65291374575 296361511th Plan
Cumu upto End of 11th Plan
596556 21212860
557439Cummulative up to end of 12th Plan
SN Contents Page
1 Rate of sale of power for the year 2016-17 33-41
RATE OF SALE OF POWER FOR THE YEAR 2016-17
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) NORTHERN REGION
CENTRAL SECTOR
BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 18000 66900 19800
CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 54000 222400 21600
CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 30000 144400 19600
CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 23100 91700 42600
PARBATI - III HPS NHPC LTD HYDRO-HYDRO 52000 68200 54800
DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 28000 95600 30000
CHUTAK NHPC LTD HYDRO-HYDRO 4400 22000 79800
DULHASTI HPS NHPC LTD HYDRO-HYDRO 39000 228000 56400
SALAL HPS NHPC LTD HYDRO-HYDRO 69000 342300 11000
TANAKPUR HPS NHPC LTD HYDRO-HYDRO 9420 43000 29600
URI HPS -I NHPC LTD HYDRO-HYDRO 48000 280300 16000
URI HPS - II NHPC LTD HYDRO-HYDRO 24000 147300 48600
NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 4500 24600 88200
SEWA - II NHPC LTD HYDRO-HYDRO 12000 47100 43400
ANTA CCPP NTPC LTD THERMAL-GASN 41930 67539 32400
AURAIYA CCPP NTPC LTD THERMAL-GASN 66336 53501 39100
BADARPUR TPS NTPC LTD THERMAL-COAL 70500 159153 44800
DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 84000 296170 42300
DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 98000 526686 46300
DADRI CCPP NTPC LTD THERMAL-GASHSD 82978 227469 33000
FARIDABAD CCPP NTPC LTD THERMAL-GASN 43159 115577 30800
RIHAND STPS I NTPC LTD THERMAL-COAL 100000 596766 24500
RIHAND STPS II NTPC LTD THERMAL-COAL 100000 737069 24600
RIHAND STPS III NTPC LTD THERMAL-COAL 100000 706546 30600
SINGRAULI STPS NTPC LTD THERMAL-COAL 200000 1394068 20400
TANDA TPS NTPC LTD THERMAL-COAL 44000 295438 40800
UNCHAHAR TPS I NTPC LTD THERMAL-COAL 42000 256454 39800
UNCHAHAR TPS II NTPC LTD THERMAL-COAL 42000 273577 38900
UNCHAHAR TPS III NTPC LTD THERMAL-COAL 21000 142780 43000
KOLDAM NTPC LTD HYDRO-HYDRO 80000 363260 43600
NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 303575 25841
RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 108000 668677 35374
NJHPS SJVNL HYDRO-HYDRO 150000 699496 23820
RAMPUR HPS SJVNL HYDRO-HYDRO 41202 195982 32260
TEHRI HPP THDC HYDRO-HYDRO 100000 272543 51800
KOTESHWAR HEP THDC HYDRO-HYDRO 40000 106244 53400
IGSTPS JHAJJAR ARAVALI P CPL THERMAL-COAL 150000 510429 49490
NEYVELI BARSINGSAR NEYVELI LIG CORP LTD THERMAL-LIG 25000 127520 38040
STATE SECTOR
PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 21000 14222 48200
PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 21000 19205 48400
PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 25000 102257 42600
PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 25000 62107 41800
DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 60000 312213 41000
RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 120000 35767442200
WYC HYDEL STATION HPGCL HYDRO-HYDRO 6240 20365 24900
GIRI POWER HOUSE HPSEB HYDRO-HYDRO 6000 13958 7600
ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 1695 5467 11900
BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 12000 18528 6700
GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 2250 7462 22500
BASSI POWER HOUSE HPSEB HYDRO-HYDRO 6600 29649 7500
BINWA POWER HOUSE HPSEB HYDRO-HYDRO 600 2749 19300
ANNEXURE-I
RATE OF SALE OF POWER FOR THE YEAR 2016-2017
Page 33
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) GAJ POWER HOUSE HPSEB HYDRO-HYDRO 1050 2914 26700
BANER POWER HOUSE HPSEB HYDRO-HYDRO 1200 2864 16200
HOLI POWER HOUSE HPSEB HYDRO-HYDRO 300 616 22500
THIROT POWER HOUSE HPSEB HYDRO-HYDRO 450 1126 22500
KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 1200 3064 22500
LARJI POWER HOUSE HPSEB HYDRO-HYDRO 12600 53677 23700
NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 250 750 31000
CHABA POWER HOUSE HPSEB HYDRO-HYDRO 175 465 23300
RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 150 101 13400
SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 200 000 22500
KILLAR HPSEB HYDRO-HYDRO 030 050 22500
BHABA AUGUMENP H HPSEB HYDRO-HYDRO 450 1276 22500
BS CHAMBA HPSEB HYDRO-HYDRO 045 099 19500
GUMMA HPSEB HYDRO-HYDRO 300 423 22500
GAS TURBINE POWER STATION IPGCL THERMAL-GAS 27000 67233 39300
PPS-I PPCL THERMAL-GAS 33000 175905 38300
PPS-III PPCL THERMAL-GAS 137120 196879 36100
LOWER JHELUM JampKPDD HYDRO-HYDRO 10500 60214 5100
UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 2260 10514 6300
UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 10500 44202 8500
GANDHARBAL JampKPDD HYDRO-HYDRO 1500 8925 4700
KARNAH MPH JampKPDD HYDRO-HYDRO 200 1122 31000
CHENANI I JampKPDD HYDRO-HYDRO 2330 10892 6600
CHENANI II JampKPDD HYDRO-HYDRO 200 1188 9300
CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 750 3634 14200
IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 375 2108 18500
IGO MERCHELLONG JampKPDD HYDRO-HYDRO 300 1572 29700
PAHALGAM MHP JampKPDD HYDRO-HYDRO 450 1713 32900
MARPACHOO JampKPDD HYDRO-HYDRO 075 375 29800
HAFTAL JampKPDD HYDRO-HYDRO 100 483 28700
SANJAK JampKPDD HYDRO-HYDRO 126 441 36000
SEWA-III JampKPDD HYDRO-HYDRO 900 3273 20200
BHADERWAH JampKPDD HYDRO-HYDRO 150 935 8900
BAZGO JampKPDD HYDRO-HYDRO 030 108 33300
SUMOOR JampKPDD HYDRO-HYDRO 010 045 35400
HUNDER JampKPDD HYDRO-HYDRO 040 176 26200
STAKNA JampKPDD HYDRO-HYDRO 400 1933 4100
KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 124000 662879 31360
SURATGARH TPS RRVUNL THERMAL-COAL 150000 402328 41730
CHHABRA TPS 1amp 2 RRVUNL THERMAL-COAL 50000 305946 36700
CHHABRA TPS 3 RRVUNL THERMAL-COAL 25000 151536 36700
CHHABRA TPS 4 RRVUNL THERMAL-COAL 25000 155896 36700
RAMGARH GT POWER PROJECT RRVUNL THERMAL-COAL 22050 43177 41800
RAMGARH GAS T P PROJECT 3 RRVUNL THERMAL-GAS 5000 93615 41800
DHOLPUR C C POWER PROJECT RRVUNL THERMAL-R-LNG 33000 9486 46110
MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 14000 20855 34192
MINI MICRO HYDEL (MMH) P S RRVUNL HYDRO-HYDRO 2385 851 37800
KALISINDH TPP 1 RRVUNL THERMAL-COAL 60000 341543 45000
KALISINDH TPP 2 RRVUNL THERMAL-COAL 60000 211588 45000
KHARA HEP UPJVNL HYDRO-HYDRO 7200 26654 7200
MATATILLA HEP UPJVNL HYDRO-HYDRO 3060 12219 6500
OBRA HEP UPJVNL HYDRO-HYDRO 9900 21517 6300
RIHAND UPJVNL HYDRO-HYDRO 30000 57369 5500
ANPARA A TPS UPRVUNL THERMAL-COAL 63000 317536 27000
ANPARA B TPS UPRVUNL THERMAL-COAL 100000 705605 22700
ANPARA D UPRVUNL THERMAL-COAL 100000 300158 39800
HARDUAGANJ TPS UPRVUNL THERMAL-COAL 16500 45817 49200
HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 50000 304389 46600
OBRA A TPS UPRVUNL THERMAL-COAL 28800 13158 34000
OBRA B TPS UPRVUNL THERMAL-COAL 100000 328124 21900
Page 34
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) PANKI TPS UPRVUNL THERMAL-COAL 21000 66488 50300
PARICHHA TPS UPRVUNL THERMAL-COAL 22000 38762 49400
PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 42000 231931 45600
PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 50000 276722 50400
CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 24000 70845 8290
CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 14400 75366 8390
DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 3375 9595 12080
DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 5100 18701 10520
KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4140 17359 12330
KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 12000 33001 9420
KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 3000 11953 8320
TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 9000 33983 12460
MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 30400 124510 16110
RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 19800 17897 10550
MPUR UTTARAKHAND JVNL HYDRO-HYDRO 930 5121 19200
PATHRI UTTARAKHAND JVNL HYDRO-HYDRO 2040 11636 14200
GALOGI UTTARAKHAND JVNL HYDRO-HYDRO 300 648 12500
PRIVATE SECTOR
MGTPP CLP INDIA PVT LTD THERMAL-COAL 132000 268902 41940
SHRINAGAR HEP ALAKNANDA HPCL HYDRO-HYDRO 33000 127414 48800
GAMA INFRAPROP CCPP GAMA INFRAPROP PVT THERMAL-GAS 22500 52686 47000
PPGCL (BARA) JP POWER VENTURES LTD THERMAL-COAL 198000 448200 38500
MALANA HEP MALANA PCL HYDRO-HYDRO 8600 26354 29792
MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 10000 30369 32580
ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 19200 56347 36079
KASHANG HEP H P PCL HYDRO-HYDRO 19500 5034 29200
BASPA-II HEP HBPCL HYDRO-HYDRO 30000 132769 13600
KARCHAM WANGTOO HEP HBPCL HYDRO-HYDRO 100000 434386 36600
RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 108000 582600 43700
RITHALA COMBI CY POWER PLANT TATA POWER DDL THERMAL-GAS 9480 000 11900
RAJPURA TPS NABHA POWER LTD THERMAL-GAS 140000 901484 39000
TALWANDI SABO POWER LTD TALWANDI SABO POWER LTD THERMAL-COAL 198000 636040 49548
ROJA THERMAL POWER STATION ROJA POWER SCL THERMAL-COAL 120000 727200 43400
KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 34400 63400
BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 36000 62600
MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 38200 60800
UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 37900 61500
KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 42300 58800
LALITPUR PGCL BAJAJ ENERGY PVT LTD THERMAL-COAL 198000 359400 47300
PRAYAGRAJ PGCL PRAYAGRAJ PGCL THERMAL-COAL 132000 448200 38595
KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 132000 783182 33438
WESTERN REGION
CENTRAL SECTOR
INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 100000 325333 23892
OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 52000 141663 34001
GANDHAR CCPP NTPC LTD THERMAL-GAS 65739 221924 28700
KAWAS CCPP NTPC LTD THERMAL-GASN 65620 167929 27000
KORBA I amp II NTPC LTD THERMAL-COAL 210000 1499171 20500
KORBA III NTPC LTD THERMAL-COAL 50000 358746 26600
SIPAT STPS I NTPC LTD THERMAL-COAL 198000 1479902 26800
SIPAT STPS II NTPC LTD THERMAL-COAL 100000 766549 26500
VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 126000 693142 25800
VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 100000 608781 23800
VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 100000 673475 27600
VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 100000 655924 32900
VINDHYACHAL STPS V NTPC LTD THERMAL-COAL 50000 328265 31700
MOUDA I NTPC LTD THERMAL-COAL 100000 343130 44500
MOUDA Ii NTPC LTD THERMAL-COAL 66000 40637 39900
RATNAGIRI GAS amp POWER PVT LTD RGPPL THERMAL-GAS 196708 442485 47000
KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 000 24729
TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 32000 201227 10740
Page 35
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 365122 19069
TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 787444 29324
STATE SECTOR
GSEG-HAZIRA15610 MW GUJARAT S ENEGEN LTD THERMAL-GAS 15610 1805 28200
GSEG-HAZIRA35143 MW GUJARAT S ENEGEN LTD THERMAL-GAS 35130 22276 51300
GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 21978 51800
AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 13929 26100
KORBA TPS EAST CSPGCL THERMAL-COAL 44000 198673 33880
DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 365808 27570
KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 316500 30420
HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 532878 19410
CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 515 58300
MTTPS CHAMPA U-I CSPGCL THERMAL-COAL 50000 220376 39000
MTTPS CHAMPA U-II CSPGCL THERMAL-COAL 50000 23709 10000
SHP GANGREL CSPGCL HYDRO-HYDRO 1000 2350 36790
BANGO HEP CSPGCL HYDRO-HYDRO 12000 14662 8900
MHP KORBA WEST CSPGCL HYDRO-HYDRO 170 859 38190
SIKASAR HEP CSPGCL HYDRO-HYDRO 700 418 26870
DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8843 74500
DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 19446 51500
GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 66388 71600
GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127488 41300
KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 96072 43900
KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 29841 56400
SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 184966 58800
UKAI 1-5 GSECL THERMAL-COAL 85000 204891 46900
UKAI TPS 6 GSECL THERMAL-COAL 50000 284448 48200
WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 271999 58300
WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 82808 44100
KADANA HPS GSECL HYDRO-HYDRO 24200 34433 16800
UKAI HPS GSECL HYDRO-HYDRO 30500 40585 6100
TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 123000 11500
BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 8900 10900
BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 7200 27500
JHINNA HPS MPPGCL HYDRO-HYDRO 2000 9700 18500
RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 44300 3400
GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 17300 4600
SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 4100 16900
MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 14600 27000
PENCH HPS MPPGCL HYDRO-HYDRO 16000 23700 8100
RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 3000 16900
AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 134400 35100
SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 283800 38700
SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 344600 34300
SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 111600 61600
SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 211800 58000
SSTPS PH-I MPPGCL THERMAL-COAL 120000 233100 84300
BHUSAWAL TPS MSPGCL THERMAL-COAL 142000 566258 51100
CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1365682 33700
KHAPERKHEDA MSPGCL THERMAL-COAL 134000 706207 39100
KORADI TPS MSPGCL THERMAL-COAL 62000 443206 42000
NASIK TPS MSPGCL THERMAL-COAL 63000 297275 47000
PARLI TPS MSPGCL THERMAL-COAL 113000 175934 71600
PARAS MSPGCL THERMAL-COAL 50000 267931 38700
URAN CCPP MSPGCL THERMAL-GAS 67200 320330 30600
KOYANA MSPGCL HYDRO-HYDRO 195600 328155 13100
SMALL HYDRO POWER PLANTS MSPGCL HYDRO-HYDRO 45400 93062 30500
BHIRA MSPGCL HYDRO-HYDRO 8000 10046 8400
TILLARI MSPGCL HYDRO-HYDRO 8900 10584 3100
SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 233298 20500
SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 87633 20500
PRIVATE SECTOR
Page 36
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 81282 46750
JNSTPP(JAYPEE NIGRIE) JP POWER VENTURES LTD THERMAL-COAL 132000 726695 29310
MB POWER MB POWER THERMAL-COAL 120000 345632 38310
ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 754922 28671
ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 780761 23495
ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 198000 1263784 32090
ADANI POWER MAHARA ADANI POWER LTD THERMAL-COAL 330000 1666191 34124
AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 170065 36827
SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 252035 45129
ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 458551 36000
ESSAR POWER MP LTD ESSAR POWER MP LTD THERMAL-COAL 60000 243040 28600
VEDANTA LTD (P P -I) VEDANTA LTD THERMAL-GAS 3000 15044 24000
VEDANTA LTD (P P -II) VEDANTA LTD THERMAL-GAS 3000 21293 24000
PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 8234600 24000
165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 5850 64390
145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 68717 40349
SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 132655 28776
SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 144686 38567
MUNDRA UMPPCOASTAL GUJARAT POWER
LTD THERMAL-IMP COAL 400000 2530300
23900
LANCO AMARKANTAK TPP PATHADIH
U-ILANCO AMARKAN POWER LTD THERMAL-COAL 30000 195500
29200
LANCO AMARKANTAK TPP PATHADIH
U-IILANCO AMARKAN POWER LTD THERMAL-COAL 30000 206900
27600
BARADARHA TPS D B POWER LTD THERMAL-COAL 120000 677373 29200
JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 405000 28900
JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 453000 40500
DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 339437 40700
TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 293400 44000
TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 137200 37000
TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 174900 44000
BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 92900 14100
BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23700 34300
KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 27600 48300
CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2530300 23900
BHANDARDRA HEP -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 2475 54900
SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 161400 26500
SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 445000 39000
SOTHERN REGION
CENTRAL SECTOR
NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 325699 54820
NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 305532 39880
NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 998805 38510
NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 113016 54070
NEYVELI TAMILNADU POWER LTD JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 625274 42200
VALLUR TPS NTPC TECL THERMAL-COAL 150000 856438 42350
R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 1493 84300
RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1502919 29400
RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 341291 31800
SIMHADRI I NTPC LTD THERMAL-COAL 100000 688382 36800
SIMHADRI II NTPC LTD THERMAL-COAL 100000 663657 43400
KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 593110 31324
MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 291625 21764
KKNPP-1 amp 2 NPCIL NUCLEAR-NUCLEAR 200000 572609 40948
MINICOY LAKSHADEEP THERMAL-DIESEL 340 770 29600
KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1097 29600
AMINI LAKSHADEEP THERMAL-DIESEL 265 509 29600
ANDROTT LAKSHADEEP THERMAL-DIESEL 219 524 29600
KALPENI LAKSHADEEP THERMAL-DIESEL 175 356 29600
AGATTI LAKSHADEEP THERMAL-DIESEL 195 658 29600
KADMAT LAKSHADEEP THERMAL-DIESEL 190 414 29600
KILTAN LAKSHADEEP THERMAL-DIESEL 150 269 29600
CHETLET LAKSHADEEP THERMAL-DIESEL 100 139 29600
BITRA LAKSHADEEP THERMAL-DIESEL 043 024 29600
BANGARAM LAKSHADEEP THERMAL-DIESEL 018 009 29600
Page 37
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) STATE SECTOR
Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 721811 46500
Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 50000 336142 46500
RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 237358 46500
RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 239926 46500
RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 124500 46500
SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 62109 46500
UPPER SILERU APGENCO HYDRO-HYDRO 24000 33000 46500
LOWER SILERU APGENCO HYDRO-HYDRO 46000 81066 46500
DONKARAI APGENCO HYDRO-HYDRO 2500 6007 46500
PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 1262 46500
CHETTIPETA APGENCO HYDRO-HYDRO 100 214 46500
MUCHKUND APGENCO HYDRO-HYDRO 12000 37571 46500
NAGARJUNASAGAR RCPH APGENCO HYDRO-HYDRO 9000 606 46500
TUNGABHADRA HES amp HAMPI(AP
Share)
APGENCO HYDRO-HYDRO 7200 6100 46500
KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 352232 42600
KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 288131 32500
KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 319272 46500
RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 40073 44300
KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 308317 46000
KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 308963 51300
SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 61004 76600
NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 17960 75300
PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 20873 58300
POCHAMPAD-I TSPGENCO HYDRO-HYDRO 2700 5455 29800
POCHAMPAD-II TSPGENCO HYDRO-HYDRO 900 1932 40700
NIZAMSAGAR TSPGENCO HYDRO-HYDRO 1000 1126 53400
RAICHUR TPS 1 to 7 KPCL THERMAL-COAL 147000 890866 43800
RAICHUR TPS 8 KPCL THERMAL-COAL 25000 159523 48200
BELLARI TPS 1 KPCL THERMAL-COAL 50000 318679 51100
BELLARI TPS 2 KPCL THERMAL-COAL 50000 232347 55600
BELLARI TPS 3 KPCL THERMAL-COAL 70000 47565 34400
BHADRA PH KPCL HYDRO-HYDRO 3920 2369 45900
GERUSUPPA PH KPCL HYDRO-HYDRO 24000 26990 22000
GHAT PRABHA HEP KPCL HYDRO-HYDRO 3200 4777 25300
KADRA HPS KPCL HYDRO-HYDRO 15000 16889 26800
NAGJHARI KPCL HYDRO-HYDRO 90000 155159 9800
KODASALLI DPH KPCL HYDRO-HYDRO 12000 14854 19200
MUNIRA+MGH+SPH+SPH KPCL HYDRO-HYDRO 22640 48211 7900
SHARAVATHY HPS KPCL HYDRO-HYDRO 108550 276215 5400
ALMATTI DPH KPCL HYDRO-HYDRO 29000 39611 24600
VARAHI UGPH KPCL HYDRO-HYDRO 46000 71368 15600
IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 17196 15300
IDUKKI HPS KSEB HYDRO-HYDRO 78000 137905 15300
KAKKAD HPS KSEB HYDRO-HYDRO 5000 13063 15300
KALLADA HPS KSEB HYDRO-HYDRO 1500 4436 15300
KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 46544 15300
KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 635 15300
LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 30822 15300
MALANKARA HPS KSEB HYDRO-HYDRO 1050 2474 15300
MATTUPETTY KSEB HYDRO-HYDRO 200 230 15300
MALAMPUZHA KSEB HYDRO-HYDRO 250 063 15300
CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 864 15300
URUMI ST I amp II KSEB HYDRO-HYDRO 615 903 15300
LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 248 15300
NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7765 19625 15300
PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 16601 15300
PANNIAR HPS KSEB HYDRO-HYDRO 3240 6217 15300
PORINGALKUTHU KSEB HYDRO-HYDRO 3600 10052 15300
PORINGALKUTHU LBE KSEB HYDRO-HYDRO 1600 9438 15300
PEPPARA KSEB HYDRO-HYDRO 300 395 15300
POOZHITHODE KSEB HYDRO-HYDRO 480 1045 15300
Page 38
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) PEECHI KSEB HYDRO-HYDRO 125 040 15300
RANI-PERUNADU KSEB HYDRO-HYDRO 400 585 15300
SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 79783 15300
SENGULAM HPS KSEB HYDRO-HYDRO 5120 11558 15300
SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 16711 15300
VILANGAD KSEB HYDRO-HYDRO 750 1578 15300
BARAPOLE KSEB HYDRO-HYDRO 1500 1932 15300
VELLATHOOVAL KSEB HYDRO-HYDRO 360 305 15300
CHIM0NY KSEB HYDRO-HYDRO 250 156 15300
ADYANPARA KSEB HYDRO-HYDRO 350 501 15300
BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 554 15300
KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 3801 15300
KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 23132 32800
ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 14416 62280
METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 523970 62280
METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 321270 62280
NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 336575 62280
NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 591240 62280
TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 508966 62280
KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 30897 62280
VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 18720 90699 62280
KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 33593 62280
BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 1047 62280
PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 1250 62280
PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 330 62280
MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 4897 62280
MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 032 62280
KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15681 62280
KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 40608 62280
KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 21342 62280
KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 4717 62280
KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4322 62280
KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2399 62280
METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 4416 62280
METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 8035 62280
BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2187 62280
BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2359 62280
BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2511 62280
BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 1949 62280
BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 1819 62280
POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 172 62280
SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 241 62280
MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 026 62280
THIRUMOORTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 136 62280
PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 9309 62280
VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 353 62280
SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 4192 62280
PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 6571 62280
SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 1186 62280
SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6319 62280
ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 6122 62280
KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 28674 62280
SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 18381 62280
SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 4258 62280
KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 12680 62280
KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4201 62280
ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 000 62280
PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 19175 62280
AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 078 62280
BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 504 62280
BHAVANI KATTALAI (BKB)(IIIampIII BB I amp II)TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 5847 62280
PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 000 62280
Page 39
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) SRI DAMODARAM STPS APPDCL THERMAL-COAL 160000 808108 36300
PRIVATE SECTOR
KARUPPUR TANJORE LANCO TANJORE PCL THERMAL-GAS 12000 48096 28770
SIMHAPURI ENERGY LTD SIMHAPURI ENERGY LTD THERMAL-COAL 60000 143900 39100
JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 7111 45500
SBU 1 JSW ENERGY LTD
VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 26000 159100
43300
SBU 2 JSW ENERGY LTD
VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 60000 247900
42800
LANCO KPLLANCO KONDAPALLI POWER
LTDTHERMAL-GAS 36814 85060
25776
LANCO KPL STG -IILANCO KONDAPALLI POWER
LTDTHERMAL-GAS 36600 12979
46330
LANCO KPL STG -IIIALANCO KONDAPALLI POWER
LTDTHERMAL-GAS 37100 85710
46330
LANCO KPL STG -III BLANCO KONDAPALLI POWER
LTDTHERMAL-GAS 37100 43639
46330
HINDUJA NATIONAL PCL HINDUJA NATIONAL PCL THERMAL-COAL 104000 303000 38200
MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 121164 49940
UDUPI POWER COR LTD ADANI POWER LTD THERMAL-COAL 120000 754613 42500
SPECTRUM POWER GENERATION
LTD SPECTRUM PG LTD THERMAL-GASN 20525 9256812
34952
TAQA NEYVELI POWER COM PVT
LTD TAQA NEYVELI THERMAL-LIG 25000 5840
34500
ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 251000 51000
ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 207860 36800
GMR VEMAGIRI POWER GENERATION
LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 30117
46450
EASTERN REGION
CENTRAL SECTOR
MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 64675 53113
MTPS STAGE - II KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 39000 1432 69138
BOKARO `B` TPS DVC THERMAL-COAL 63000 145670 31539
MEJIA TPS U 1-3 DVC THERMAL-COAL 63000 348298 31552
MEJIA TPS U 4 DVC THERMAL-COAL 21000 116099 34997
MEJIA TPS U 5-6 DVC THERMAL-COAL 50000 276427 35976
MEJIA TPS U 7-8 DVC THERMAL-COAL 100000 552854 36991
DURGAPUR STEEL TPS DVC THERMAL-COAL 100000 665550 39323
DURGAPUR TPS DVC THERMAL-COAL 21000 59270 35416
RAGHUNATHPUR TPS DVC THERMAL-COAL 120000 201650 35326
MAITHON HYDEL STA DVC HYDRO-HYDRO 6320 12200 17984
CHANDRAPURA TPSU1-3 DVC THERMAL-COAL 42000 257610 35095
CHANDRAPURA TPSU7-8 DVC THERMAL-COAL 50000 306673 34987
KODERMA TPS DVC THERMAL-COAL 100000 380180 38131
PANCHET HPS DVC HYDRO-HYDRO 8000 13360 17984
TILLAYA HPS DVC HYDRO-HYDRO 400 1410 17984
RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34700 35400
TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 277300 23200
TLDP -III NHPC LTD HYDRO-HYDRO 13200 55400 62000
TLDP -IV NHPC LTD HYDRO-HYDRO 16000 60300 25600
FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 957219 33700
FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 308943 41000
BONGAINGAON TPS NTPC LTD THERMAL-COAL 25000 153663 58600
KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 542277 34200
KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 942591 34200
BARH-II NTPC LTD THERMAL-COAL 132000 728021 44500
TALCHER TPS NTPC LTD THERMAL-COAL 46000 335521 30100
TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 702319 25600
TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1436521 24700
STATE SECTOR
BTPS(RampM) BIHAR STATE PGCL THERMAL-COAL 22000 12142 39700
BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 98331 10602
HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 50593 9482
CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 19689 2605
RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 53192 6033
UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 147208 14637
Page 40
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 60353 4519
IB TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 288567 25000
J P H GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 210 038 61100
MEYONG CHU GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 400 1086 61100
TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 122667 38200
DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 214339 43321
KOLAGHAT THERMAL POWER
STATION
WEST BENGAL PDCL THERMAL-COAL 126000 538269 31603
BAKRESHWAR THERMAL POWER
PLANT
WEST BENGAL PDCL THERMAL-COAL 105000 634876 32154
BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 45000 166855 33299
SANTHALDIH THERMAL POWER
STATION
WEST BENGAL PDCL THERMAL-COAL 50000 336442 34932
SAGARDIGHI THERMAL POWER
PROJECT
WEST BENGAL PDCL THERMAL-COAL 160000 423121 34705
JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 20344 68900
RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 24559 68900
TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 4623 68900
PURULIA PUMPED STORAGE
PROJECT
WEST BENGAL SEDCL HYDRO-HYDRO 90000 108816 68900
MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2768 68900
PRIVATE SECTOR
CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 49474 20230
CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 555500 70200
HALDIA ENERGY HALDIA ENERGY LTD THERMAL-COAL 60000 371000 50400
DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3688 63400
KAMALANGA TPS GMR KAMALANGA ENERGY LTD THERMAL-COAL 105000547670
33300
ADHUNIK POWER U-1 ADHUNIK POWER THERMAL-COAL 27000 158 44060
ADHUNIK POWER U-2 ADHUNIK POWER THERMAL-COAL 27000 168 44250
VL-JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 332800 23622
JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 43000 45250
JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 71700 37030
JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 70700 35920
JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 71100 38870
JOJOBERA UNIT 5 TATA POWER COM LTD THERMAL-COAL 12000 79300 44560
JOJOBERA UNIT 6 TATA POWER COM LTD THERMAL-WHR 12000 83700 12840
IEL KALINGANAGAR U-I TATA POWER COM LTD THERMAL-WG 6750 33400 22500
IEL KALINGANAGAR U-II TATA POWER COM LTD THERMAL-WG 6750 34800 22500
MAITHON UNIT 1 amp 2 TATA POWER COM LTD THERMAL-COAL 105000 678000 36100
HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 27500 24340
HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 28400 24340
HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 15800 24310
NORTH EASTERN REGION
CENTRAL SECTOR
LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 74100 36600
AGARTALA GT NEEPCO THERMAL-GAS 13500 88611 27210
ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 153111 32310
DOYANG HEP NEEPCO HYDRO-HYDRO 7500 25598 49801
KOPILI HEP NEEPCO HYDRO-HYDRO 20000 98186 11491
KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 19582 20237
KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 10310 17968
RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 124093 22945
TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 10100 17344 39000
STATE SECTOR
HYDRO POWER (122 Stns) ITANAGAR GOVT OF ARUNACHAL
PRADESHHYDRO-HYDRO 6971 6217270
24600
KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39514 17337
LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 82327 36810
NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 33318 48290
MYNTRIANG SHEP ST II ASSAM POWER GENCO HYDRO-HYDRO 300 567 35776
LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 9130 49200
LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 012 49200
DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 022 49200
TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 000 49200
UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 4990 16000
UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 6476 37000
UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 16494 14600
UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 3600 9556 15000
SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 758 8000
MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44070 44800
KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 154 41400
TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 091 41400
MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 411 41400
MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 394 41400
KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 760 41400
SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 3264 41400
LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 044 41400
BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 18953 28000
ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 43585 28200
GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 4080 11100
Note
LIG Lignite N Naptha WHR Waste Heat Recovery
Page 41
As on 30-04-19
Sl Voltage Ratio Capacity
No (kVkV) (MWMVA)
1 2 3 4 5
1 Bhadla SS (3x1500 3x500 MVA) 765400 PGCIL 500
2 Extn at Tumkur (Pavagada ) PS (2x500 MVA) 400220 PGCIL 500
3 Bongaigaon (2nd ICT) Ss 400220 PGCIL 315
Total of CENTRAL SECTOR 1315
4 Motiram Adda Gorakhpur (Aug) (Additional TF) 400220 UPPTCL 240
5 Muradnagar-II Ghaziabad (Aug) (Additional TF) 400220 UPPTCL 240
6 Noida Sec- 148 GBNagar (New) 400220 UPPTCL 5007 Sarnath Varanasi (Aug) TF- II (500-315) 400220 UPPTCL 1858 Sarojininagar Lucknow Aug) TF- II (500-315) 400220 UPPTCL 185
9 Unnao (Aug) TF-III 400220 UPPTCL 31510 Nawada SS 400220 HVPNL 31511 Kharepatan SS 22033 MSETCL 2512 Prathipadu SS 220132 APTRANSCO 10013 Pali Ss 22066 HVPNL 160
14 A-5 Faridabad Ss 22066 HVPNL 60
15 Rentachintala Ss Aug(3X100-2x100) 220132 APTRANSCO 10016 Amethi Ss 220132 UPPTCL 160
17 Gajokhar Varanasi (Aug) TF- II (160-100) 220132 UPPTCL 60
18 Gola Gorakhpur (New) 220132 UPPTCL 160
19 Khurja Bulandshahr (Aug) TF- II (200-160) 220132 UPPTCL 40
20 RC Green GB Nagar (Aug) TF-II (160-100) 220132 UPPTCL 60
21 Sikandrabad Bulandshahr (Aug) (Additional TF) 220132 UPPTCL 160
22 Sitapur (Aug) (Additional TF) 220132 UPPTCL 160
23 Sohawal Ayodhya (Aug) TF-II (160-100) 220132 UPPTCL 60
TOTAL STATE SECTOR 3285
GRAND TOTAL 4600
21(2)
CENTRAL SECTOR
STATE SECTOR
2Sub-Stations (220 kV and above) CommissionedReady for commissioning During Apr-2019
Name of Sub Stations Executing Agency
SN Contents Page
1 Electricity Generation (MU) Targets and Achievements for 2019-20 22
Section E - Electricity Generation
Programme Achievement Ach Programme Achievement Ach
Central Sector 37545100 3177900 3129530 9848 3177900 3129530 9848
State Sector 37498600 3322500 2950558 8881 3322500 2950558 8881
PvtIPP Sector 37346200 3236400 3195940 9875 3236400 3195940 9875
PvtUTL Sector 1823100 159300 165579 10394 159300 165579 10394
Total 114213000 9896100 9441607 9541 9896100 9441607 9541
Central Sector 5661700 386100 481390 12468 386100 481390 12468
State Sector 6680500 498200 536514 10769 498200 536514 10769
PvtIPP Sector 1206900 57300 80405 14032 57300 80405 14032
PvtUTL Sector 144100 12300 10930 8886 12300 10930 8886
Total 13693200 953900 1109239 11628 953900 1109239 11628
Central Sector 4472000 367300 317765 8651 367300 317765 8651
Total 4472000 367300 317765 8651 367300 317765 8651
Bhutan Import 621800 17500 24396 13941 17500 24396 13941
Central Sector 47678800 3931300 3928685 9993 3931300 3928685 9993
State Sector 44179100 3820700 3487072 9127 3820700 3487072 9127
Pvt Sector 40520300 3465300 3452854 9964 3465300 3452854 9964
Total 133000000 11234800 10893007 9696 11234800 10893007 9696
Provisional based on actual-cum-Assesment
Figs in MU
Cummulative
Achievement
Cummulative
Achievement
Mar-19 Mar-18 Upto Mar-2019 Upto Mar-2018
984785 869291 12675910 10183949
22
1 Electricity Generation (MU) Targets and Achievememts for 2019-20
All India Energy Generation During Apr-19 to Apr-19 (MU)
Target (2019-20)Apr-19 to Apr-19
Sector
Hydro
Thermal
Nuclear
Renewable Energy Generation
Achievement
Apr-2019
98961
95393673
112348
94416
11092
3178
108930
0
20000
40000
60000
80000
100000
120000
Thermal Hydro Nuclear Total
Programme
Achievement
SN Contents Page
1 Energy Power Supply Position (Provisional) for Apr-2019 and during Apr-19 to Apr-19 23
2 Peak Power Supply Position (Provisional) for Apr-2019 and during Apr-19 to Apr-19 24
3 Energy Power Supply Position (Revised) for Mar-2019 and during Apr-19 to Mar-19 25
4 Peak Power Supply Position (Revised) for Mar-2019 and during Apr-19 to Mar-19 26
5 Notified Power cuts Restrictions on Industries during Apr-2019 27
6 Power Supply to Agricultural Sector during Apr-2019 28
Section F - Power supply position
आकड़ मममलयन यननट नट Figures in MU net
ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied
कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )
चडीगढ़ Chandigarh 117 117 0 00 117 117 0 00
दिलली Delhi 2698 2698 1 00 2698 2698 1 00
हरियजणज Haryana 3773 3773 0 00 3773 3773 0 00
दहमजचल परिश Himachal Pradesh 777 777 0 00 777 777 0 00
रमम कशमीि Jammu amp Kashmir 1604 1296 308 192 1604 1296 308 192
परजब Punjab 3646 3646 0 00 3646 3646 0 00
िजरसथजन Rajasthan 6210 6208 2 00 6210 6208 2 00
उतति परिश Uttar Pradesh 10179 10148 32 03 10179 10148 32 03
उततिजखड Uttarakhand 1120 1120 0 00 1120 1120 0 00
उततरी कषतर Northern Region 30094 29786 308 10 30094 29786 308 10
छततीसगढ़ Chhattisgarh 2684 2676 8 03 2684 2676 8 03
गरिजत Gujarat 10718 10718 0 00 10718 10718 0 00
मधय परिश Madhya Pradesh 6006 6006 0 00 6006 6006 0 00
महजिजषटर Maharashtra 14308 14308 0 00 14308 14308 0 00
िमन औि दिउ Daman amp Diu 220 220 0 00 220 220 0 00
िजिि व नगि हवली Dadra amp Nagar Haveli 552 552 0 00 552 552 0 00
गोवज Goa 388 388 0 00 388 388 0 00
पशचिमी कषतर Western Region 34875 34868 8 00 34875 34868 8 00
आनधर परिश Andhra Pradesh 5708 5708 0 00 5708 5708 0 00
तलगजनज Telangana 5725 5725 0 00 5725 5725 0 00
कनजाटक Karnataka 7003 7003 0 00 7003 7003 0 00
किल Kerala 2402 2400 2 01 2402 2400 2 01
तममल नजड Tamil Nadu 10010 10010 0 00 10010 10010 0 00
पडचिी Puducherry 263 263 0 00 263 263 0 00
लकष-दवीप Lakshadweep 4 4 0 0 4 4 0 0
दकषकषणी कषतर Southern Region 31111 31109 2 00 31111 31109 2 00
बबहजि Bihar 2589 2589 0 00 2589 2589 0 00
िजमोिि घजटी ननगम DVC 1772 1772 0 00 1772 1772 0 00
झजिखणड Jharkhand 689 689 0 00 689 689 0 00
ओडडशज Odisha 2689 2689 1 00 2689 2689 1 00
पशशचम बगजल West Bengal 5075 5075 0 00 5075 5075 0 00
मसशककम Sikkim 37 37 0 00 37 37 0 00
अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 7 29 27 2 7
परवी कषतर Eastern Region 12851 12850 1 00 12851 12850 1 00
अरणजचल परिश Arunachal Pradesh 66 66 0 05 66 66 0 05
असम Assam 766 709 57 75 766 709 57 75
मणणपि Manipur 68 67 1 15 68 67 1 15
मघजलय Meghalaya 170 160 10 59 170 160 10 59
ममज़ोिम Mizoram 54 53 0 08 54 53 0 08
नजगजलड Nagaland 54 54 0 08 54 54 0 08
बिपिज Tripura 122 120 1 12 122 120 1 12
उततर-परवी कषतर North-Eastern Region 1300 1228 71 55 1300 1228 71 55
समपणण भारत All India 110231 109842 389 04 110231 109842 389 04
23
ऊरजा पनत ा म कमी ऊरजा पनत ा म कमीEnergy not Supplied
Excludes energy exported to Bangladesh
Energy not Supplied
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
ऊराण वरवदयत आपरत ण शथिरत ररपोरण (परवाणरवलोकन) Energy Power Supply Position Report (Provisional)
राजयState
अपरल 2019 April2019 अपरल2019 -अपरल2019 April2019 to April2019
अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met
कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )
चडीगढ़ Chandigarh 256 256 0 00 256 256 0 00
दिलली Delhi 5664 5664 0 00 5664 5664 0 00
हरियजणज Haryana 8127 8127 0 00 8127 8127 0 00
दहमजचल परिश Himachal Pradesh 1387 1387 0 00 1387 1387 0 00
रमम कशमीि Jammu amp Kashmir 2826 2261 565 200 2826 2261 565 200
परजब Punjab 7015 7015 0 00 7015 7015 0 00
िजरसथजन Rajasthan 10560 10560 0 00 10560 10560 0 00
उतति परिश Uttar Pradesh 19935 19935 0 00 19935 19935 0 00
उततिजखड Uttarakhand 1922 1922 0 00 1922 1922 0 00
उततरी कषतर Northern Region 54476 53985 491 09 54476 53985 491 09
छततीसगढ़ Chhattisgarh 4596 4574 22 05 4596 4574 22 05
गरिजत Gujarat 17871 17865 6 00 17871 17865 6 00
मधय परिश Madhya Pradesh 10018 10018 0 00 10018 10018 0 00
महजिजषटर Maharashtra 23158 23150 8 00 23158 23150 8 00
िमन औि दिउ Daman amp Diu 341 340 1 02 341 340 1 02
िजिि व नगि हवली Dadra amp Nagar Haveli 818 818 0 00 818 818 0 00
गोवज Goa 594 594 0 00 594 594 0 00
पशचिमी कषतर Western Region 56242 56222 20 00 56242 56222 20 00
आनधर परिश Andhra Pradesh 9151 9151 0 00 9151 9151 0 00
तलगजनज Telangana 10191 10191 0 00 10191 10191 0 00
कनजाटक Karnataka 12681 12681 0 00 12681 12681 0 00
किल Kerala 4309 4300 8 02 4309 4300 8 02
तममल नजड Tamil Nadu 15972 15972 0 00 15972 15972 0 00
पडचिी Puducherry 482 480 2 05 482 480 2 05
लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0
दकषकषणी कषतर Southern Region 49155 49103 52 01 49155 49103 52 01
बबहजि Bihar 5357 5357 0 00 5357 5357 0 00
िजमोिि घजटी ननगम DVC 3039 3039 0 00 3039 3039 0 00
झजिखणड Jharkhand 1266 1266 0 00 1266 1266 0 00
ओडडशज Odisha 5389 5389 0 00 5389 5389 0 00
पशशचम बगजल West Bengal 8666 8666 0 00 8666 8666 0 00
मसशककम Sikkim 100 100 0 00 100 100 0 00
अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7
परवी कषतर Eastern Region 23349 23349 0 00 23349 23349 0 00
अरणजचल परिश Arunachal Pradesh 139 136 3 22 139 136 3 22
असम Assam 1712 1667 45 26 1712 1667 45 26
मणणपि Manipur 197 188 9 46 197 188 9 46
मघजलय Meghalaya 336 336 0 00 336 336 0 00
ममज़ोिम Mizoram 116 113 3 26 116 113 3 26
नजगजलड Nagaland 157 131 26 166 157 131 26 166
बिपिज Tripura 292 291 1 03 292 291 1 03
उततर-परवी कषतर North-Eastern Region 2848 2780 68 24 2848 2780 68 24
समपणण भारत All India 177411 176810 601 03 177411 176810 601 03
24
मजग की पनत ा म कमी Demand not Met
Excludes the supply to Bangladesh
राजयStateअपरल 2019 April2019
मजग की पनत ा म कमी Demand not Met
अधिकतम वरवदयत आपरत ण शथिरत ररपोरण (परवाणरवलोकन) Peak Power Supply Position Report (Provisional)
आकड़ मगज वजट नट Figures in MW netअपरल2019 -अपरल2019 April2019 to April2019
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
आकड़ मममलयन यननट नट Figures in MU net
ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied
कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )
चडीगढ़ Chandigarh 96 96 0 00 1561 1561 0 00
दिलली Delhi 1931 1930 1 00 32299 32282 17 01
हरियजणज Haryana 3658 3658 0 00 53665 53665 0 00
दहमजचल परिश Himachal Pradesh 832 830 2 02 9850 9618 232 24
रमम कशमीि Jammu amp Kashmir 1767 1414 353 200 19593 15868 3725 190
परजब Punjab 3585 3585 0 00 55288 55275 13 00
िजरसथजन Rajasthan 6774 6770 4 01 79826 79637 189 02
उतति परिश Uttar Pradesh 8754 8691 63 07 117101 116118 984 08
उततिजखड Uttarakhand 1067 1067 0 00 13845 13753 92 07
उततरी कषतर Northern Region 28464 28041 423 15 383028 377776 5251 14
छततीसगढ़ Chhattisgarh 2464 2457 8 03 26130 26076 54 02
गरिजत Gujarat 9890 9890 0 00 116588 116572 15 00
मधय परिश Madhya Pradesh 6236 6236 0 00 75667 75665 2 00
महजिजषटर Maharashtra 13631 13631 0 00 158285 158148 137 01
िमन औि दिउ Daman amp Diu 221 221 0 00 2557 2557 0 00
िजिि व नगि हवली Dadra amp Nagar Haveli 553 553 0 00 6317 6317 0 00
गोवज Goa 362 362 0 00 4283 4280 3 01
पशचिमी कषतर Western Region 33357 33349 8 00 389827 389615 212 01
आनधर परिश Andhra Pradesh 6072 6071 1 00 63735 63677 58 01
तलगजनज Telangana 6930 6929 1 00 66697 66635 62 01
कनजाटक Karnataka 7614 7612 1 00 71759 71690 69 01
किल Kerala 2489 2488 1 00 25029 24911 118 05
तममल नजड Tamil Nadu 10247 10245 2 00 109375 109273 102 01
पडचिी Puducherry 252 251 1 04 2761 2751 10 03
लकष-दवीप Lakshadweep 4 4 0 0 46 46 0 0
दकषकषणी कषतर Southern Region 33605 33597 8 00 339355 338938 417 01
बबहजि Bihar 2319 2318 1 00 30052 29827 225 07
िजमोिि घजटी ननगम DVC 1773 1772 1 00 22365 21995 369 17
झजिखणड Jharkhand 698 697 1 01 8682 8461 221 25
ओडडशज Odisha 2583 2582 1 00 31810 31781 30 01
पशशचम बगजल West Bengal 4585 4584 2 00 52237 52078 159 03
मसशककम Sikkim 41 41 0 00 513 512 0 01
अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 67 346 323 23 67
परवी कषतर Eastern Region 11999 11995 5 00 145658 144654 1004 07
अरणजचल परिश Arunachal Pradesh 61 60 0 06 864 855 9 10
असम Assam 680 656 23 34 9532 9204 328 34
मणणपि Manipur 68 68 1 09 916 906 10 11
मघजलय Meghalaya 173 173 0 03 1955 1953 1 01
ममज़ोिम Mizoram 50 49 0 09 668 661 8 12
नजगजलड Nagaland 58 57 1 20 902 809 93 103
बिपिज Tripura 150 150 0 00 1859 1837 21 11
उततर-परवी कषतर North-Eastern Region 1240 1214 26 21 16696 16225 471 28
समपणण भारत All India 108665 108196 469 04 1274564 1267209 7355 06
Note The revised data for March 2019 is not avaliable
Excludes energy exported to Bangladesh
राजयState
ऊराण वरवदयत आपरत ण शथिरत ररपोरण (परवाणरवलोकन) Energy Power Supply Position Report (Provisional)
25
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
Energy not Supplied Energy not Supplied
मािण2019 March2019 अपरल2018 -मािण2019 April2018 to March2019
ऊरजा पनत ा म कमी ऊरजा पनत ा म कमी
अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met
कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )
चडीगढ़ Chandigarh 223 223 0 00 369 369 0 00
दिलली Delhi 4016 4016 0 00 7016 7016 0 00
हरियजणज Haryana 6544 6544 0 00 10270 10270 0 00
दहमजचल परिश Himachal Pradesh 1683 1683 0 00 1700 1700 0 00
रमम कशमीि Jammu amp Kashmir 3277 2622 655 200 3277 2622 655 200
परजब Punjab 6564 6564 0 00 12638 12638 0 00
िजरसथजन Rajasthan 11885 11885 0 00 13276 13276 0 00
उतति परिश Uttar Pradesh 16220 16220 0 00 20498 20062 436 21
उततिजखड Uttarakhand 2002 2002 0 00 2216 2216 0 00
उततरी कषतर Northern Region 47925 47356 569 12 63166 61726 1440 23
छततीसगढ़ Chhattisgarh 4444 4128 316 71 4444 4270 174 39
गरिजत Gujarat 16263 16263 0 00 17053 16963 90 05
मधय परिश Madhya Pradesh 12328 12323 5 00 13815 13815 0 00
महजिजषटर Maharashtra 22361 22291 70 03 23864 23254 610 26
िमन औि दिउ Daman amp Diu 336 336 0 01 357 356 1 02
िजिि व नगि हवली Dadra amp Nagar Haveli 800 799 1 01 816 815 1 01
गोवज Goa 538 538 0 00 596 596 0 00
पशचिमी कषतर Western Region 53132 52965 167 03 56675 55821 853 15
आनधर परिश Andhra Pradesh 8977 8977 0 00 9459 9453 6 01
तलगजनज Telangana 10471 10471 0 00 10815 10815 0 00
कनजाटक Karnataka 12841 12841 0 00 12841 12841 0 00
किल Kerala 4264 4228 36 09 4264 4228 36 09
तममल नजड Tamil Nadu 15712 15712 0 00 15712 15712 0 00
पडचिी Puducherry 427 412 15 34 427 412 15 34
लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0
दकषकषणी कषतर Southern Region 49464 49464 0 00 49464 49464 0 00
बबहजि Bihar 4633 4633 0 00 5115 5084 31 06
िजमोिि घजटी ननगम DVC 3035 3035 0 00 3035 3035 0 00
झजिखणड Jharkhand 1210 1210 0 00 1339 1291 48 36
ओडडशज Odisha 4827 4827 0 00 5357 5357 0 00
पशशचम बगजल West Bengal 8287 8287 0 00 9130 9123 7 01
मसशककम Sikkim 100 100 0 00 106 106 0 00
अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7
परवी कषतर Eastern Region 21658 21658 0 00 23141 22733 408 18
अरणजचल परिश Arunachal Pradesh 133 131 2 15 138 138 0 01
असम Assam 1539 1508 31 20 1865 1809 56 30
मणणपि Manipur 204 199 5 25 219 216 3 12
मघजलय Meghalaya 357 357 0 00 374 372 1 04
ममज़ोिम Mizoram 108 105 3 28 121 119 2 17
नजगजलड Nagaland 127 125 2 16 156 138 18 116
बिपिज Tripura 249 249 0 00 298 293 5 17
उततर-परवी कषतर North-Eastern Region 2540 2535 5 02 2967 2850 117 39
समपणण भारत All India 169464 168745 719 04 177022 175528 1494 08
Note The revised data for March 2019 is not avaliable 26
अधिकतम वरवदयत आपरत ण शथिरत ररपोरण (परवाणरवलोकन) Peak Power Supply Position Report (Provisional)
आकड़ मगज वजट नट Figures in MW net
राजयStateमािण2019 March2019 अपरल2018 -मािण2019 April2018 to March2019
मजग की पनत ा म कमी मजग की पनत ा म कमी Demand not MetDemand not Met
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
Excludes the supply to Bangladesh
अपरल 2019 April2019 अपरल2018 -मािण2019 April2019 to April2019
उततरी कषतर Northern Region
चडीगढ़ Chandigarh(Data Not Received)दिलली Delhi
हरियजणज Haryana
दहमजचल परिश Himachal Pradeshरमम कशमीि Jammu amp Kashmir(Data
Not Received)परजब Punjab
िजरसथजन Rajasthanउतति परिश Uttar Pradesh
उततिजखड Uttarakhand
पशचिमी कषतर Western Region
छततीसगढ़ Chhattisgarh
Apr-Nov 2018- No cuts
Maximum Demand cut-58MW
Energy cut- 00020-00032 MUsday
गरिजत Gujarat
मधय परिश Madhya Pradesh
महजिजषटर Maharashtra
गोवज Goa
दकषकषणी कषतर Southern Region
आनधर परिश Andhra Pradesh
तलगजनज Telangana
कनजाटक Karnataka
किल Kerala
तममल नजड Tamil Nadu
पडचिी Puducherryपरवी कषतर Eastern Region
बबहजि Bihar
झजिखणड Jharkhand
ओडडशज Odisha
पशशचम बगजल West Bengal
No N
otifie
d Cu
ts
27
मािण 2019 म इडथरीर पर वरवदयत करौती का वरवरवरण Notified Power CutsRestrictions on Industries during April2019
राजय कषतर State Regionऊराणमाग करौती EnergyDemand Cut
No N
otifie
d Cu
tsNo
Notifie
d Cu
ts
अपरल2019 April 2019 अपरल2019 -अपरल2019 April2019 to April2019
उततरी कषतर Northern Region
चडीगढ़ Chandigarh Data not received Data not received
दिलली Delhi Data not received Data not received
हरियजणज Haryana 0811 hrsday 0811 hrsday
दहमजचल परिश Himachal Pradesh HPSEBL has only 2 agriculture consumers and uninterrupted
power is being supplied to agriculture sector
HPSEBL has only 2 agriculture consumers and uninterrupted
power is being supplied to agriculture sector
रमम कशमीि Jammu amp Kashmir Data not received Data not received
परजब Punjab 379 hrsday 379 hrsday
िजरसथजन Rajasthan 0630 hrsday 0630 hrsday
उतति परिश Uttar Pradesh 2157 hrsday 2157 hrsday
उततिजखड Uttarakhand 2359 hrsday 2359 hrsday
पशचिमी कषतर Western Region
छततीसगढ़ Chhattisgarh 18 hrsday 18 hrsday
गरिजत Gujarat 8 hrsday 8 hrsday
मधय परिश Madhya Pradesh Three-Phase Supply(Irrigation)- 0953 hrs day Three-Phase
(Mixed) Supply - 2334 hrs day
Three-Phase Supply(Irrigation)- 0953 hrs day Three-Phase
(Mixed) Supply - 2334 hrs day
महजिजषटर Maharashtra Three-Phase Supply(Irrigation)- 9 hrs day Three-Phase Supply(Irrigation)- 9 hrs day
गोवज Goa No restriction No restriction
दकषकषणी कषतर Southern Region
आनधर परिश Andhra Pradesh 07 hrsday 07 hrsday
तलगजनज Telangana 24 hrsday 24 hrsday
कनजाटक Karnataka 6 hrsday 6 hrsday
किल Kerala No Restrictions No Restrictions
तममल नजड Tamil Nadu 9 hrsday (6 hrs during day time and 3 hrs during night time) 9 hrsday (6 hrs during day time and 3 hrs during night time)
पडचिी Puducherry No Restrictions No Restrictions
परवी कषतर Eastern Region
बबहजि Bihar 18 hrsday 18 hrsday
झजिखणड Jharkhand 20 hrsday 20 hrsday
ओडडशज Odisha 24 hrsday 24 hrsday
पशशचम बगजल West Bengal 23 hrsday 23 hrsday
28
मारच 2019 कषि कषतर को षिदयत आपरतच का षििरण Power Supply to Agricultural Sector during March2019
राजय कषतर State Regionऔसत वरवदयत आपरत ण घनरो म Average Hours of Supply
On segregated feeders
SNo Contents Page
1 Growth of Installed Capacity since 6th Plan 29
2 Progress of Transmission Sector since 6th Plan 30
3 All India Yearly Coal consumption for Power Generation (Utilities)
4 All India Annual Per Capita Consumption of Electricity since -2006
5 Average cost of power supply amp Average realisation (Paisakwh)
6 Growth of Rural Electrification amp Pump Sets Energisation
7 Status of Hydro Schemes Cleared by the CEA in Apr-2019
Section G - Growth of Power Sector
31
32
(In MW)
Coal Gas Diesel Total
End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472
End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634
End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537
End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596
End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921
End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703
End of 12th Plan 19216288 2532938 83763 21832988 6780 4447842 50018 31960630
Up to Apr-2019 20070450 2493722 63763 22627934 678000 4539922 7764163 35610019
Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-17) = 51529 MW
Electricity Generation (MU) Targets and Achievements for 2016-17
Coal Gas Diesel Nuclear Hydro Res Total
2007045 2493722 637629 678000 453992 77641625 22925174
29
1 Growth of Installed Capacity Since 6th Plan
Plan YearThermal
Nuclear Hydro RES (MNRE) Total
2007045
2493722637629
678000
4539922
77641625
Total Installed Capacity 35610019 MW
Coal Gas Diesel Nuclear Hydro Res
Progress of Transmission Sector in the Country up to April 2019
1 TRANSMISSION LINES (All fig in CKM)
At the end of
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
6th plan 0 0 0 0 0 0 0 0 0 0 0 0 1831 4198 0 6029 1641 44364 0 46005 3472 48562 0 52034
7th plan 0 0 0 0 0 0 0 0 0 0 0 0 13068 6756 0 19824 4560 55071 0 59631 17628 61827 0 79455
8th plan 0 0 0 0 1634 0 0 1634 0 0 0 0 23001 13141 0 36142 6564 73036 0 79600 31199 86177 0 117376
9th plan 0 0 0 0 3234 1504 0 4738 751 409 0 1160 29345 20033 0 49378 8687 88306 0 96993 42017 110252 0 152269
10th plan 0 0 0 0 4368 1504 0 5872 1775 409 0 2184 48708 24730 0 73438 9444 105185 0 114629 64295 131828 0 196123
11th Plan 0 0 0 0 5948 1504 1980 9432 4839 411 0 5250 71023 30191 5605 106819 10140 125010 830 135980 91950 157116 8415 257481
12th Plan 6124 0 0 6124 5948 1504 1980 9432 25465 1177 4598 31240 92482 48240 17065 157787 11014 151276 978 163268 141033 202197 24621 367851
13th Plan (Up
to Mar2019)6124 0 0 6124 5948 1504 1980 9432 33692 1512 6605 41809 101335 58238 21173 180746 11734 162552 1010 175296 158833 223806 30768 413407
13th Plan (Up
to Apr-19)6124 0 0 6124 5948 1504 1980 9432 33745 1512 6605 41862 101335 58258 21173 180766 11734 162953 1010 175697 158886 224227 30768 413881
27150 600 MW of 132 kV Inter-Regional power transmission capacity links which are operated radially from time to time is not added in the total
75050
47900
24000
99050
30
Grand Total
Note - The figure upto the end of 10th plan in for stringing progress including the lines not commissioned Now only commissioned lines are reckoned Accordingly the figure for 10th plan (end) may read
as 187555 after adjusting with (-) 10852 Ckm
Inter-regional Power Transfer Capacity (MW)
plusmn 800 kV HVDC plusmn 500 kV HVDC 765 kV 400 kV 220 kV
IR addition in 12th
Plan (up to March
2017)
Inter-regional
Transmission
Capacity at the end
of Plan Period 2017-
22 (as on April19)
IR at the end of 11th
PlanIR at the end of 12th
Plan
IR Capacity Addition
at the end of Plan
Period 2017-22 (Till
April 19)
2004-05 27800
2005-06 28100
2006-07 30200
2007-08 33000
2008-09 35500
2009-10 36700
2010-11 38700
2011-12 41756
2012-13 45460
2013-14 48940
2014-15 53040
2015-16 54590
2016-17 57430
2017-18 60800
2018-19 62890
Year
2005-06
2006-07
2007-08
2008-09
2009-10
2010-11
2011-12
2012-13
2013-14
2014-15
2015-16
2016-17
2017-18
2018-19
2004-05 254 209 7568
2005-06 260 221 7636
2006-07 276 227 7423
2007-08 293 239 7727
2008-09 340 263 8713
2009-10 355 268 8870
2010-11 398 303 11975
2011-12 455 330 13514
2012-13 501 376 14867
2013-14 518 175
2014-15 520
Source- PFC Reports on the performance of State Power Utilities 31
1181
7335
7786
91441
8188
88363
957
1010
1075
1122
1149
(GrossGen+ Net Import) Mid-year population Provisional
5 Average cost of power supply amp average realization ( paiseKWH )
Yearcost of supply
(paiseunit)
Realization(paiseunit)
Including AgricultureOnly
Agriculture
6719
7171
3 All India yearly Coal Consumption for Power Generation (Utilities)
YEARCoal Consumption
Million Tonnes
4 All India Annual per Capita consumption of Electricity Since 2006
Per Capita Consumption ( kWh)
6314
Sl
NoExecuting Agency
Installed
Capacity (MW)Cost (Rs crore)
Date of
Clearance
32
Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as
Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received
from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made
available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified
villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is
independent of the earlier published reports
No Hydro Electric Project has been issued concurrenceAppraisal letter by CEA during April 2019
7 Status of Hydro Schemes Cleared by the CEA in Apr-2019
Name of Scheme
1999-002000-01
297594
010408 to 310309010409 to 310310
10th Plan
2005-062006-07
322968331020
6 Growth Of Rural Electrification amp Pumpsets Energisation
Plan Year
9th Plan2002-03
134092626
4111
Pump Sets Energised Villages Electricfied (Nos)
2001-02
284064367244
1218
27801997-981998-99
3207
482864
12632
1576036
4451722594
15455554
2314176
397343611750
2093311060316074
65109527813884
46708
18423975
499150
2003-042004-05
5743
9769
Cumu upto End of 10th Plan
010407 to 310308
010410 to 310311557976840909
010411 to 310312
412667
86293726
No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification
since 2004-05
65291374575 296361511th Plan
Cumu upto End of 11th Plan
596556 21212860
557439Cummulative up to end of 12th Plan
SN Contents Page
1 Rate of sale of power for the year 2016-17 33-41
RATE OF SALE OF POWER FOR THE YEAR 2016-17
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) NORTHERN REGION
CENTRAL SECTOR
BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 18000 66900 19800
CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 54000 222400 21600
CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 30000 144400 19600
CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 23100 91700 42600
PARBATI - III HPS NHPC LTD HYDRO-HYDRO 52000 68200 54800
DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 28000 95600 30000
CHUTAK NHPC LTD HYDRO-HYDRO 4400 22000 79800
DULHASTI HPS NHPC LTD HYDRO-HYDRO 39000 228000 56400
SALAL HPS NHPC LTD HYDRO-HYDRO 69000 342300 11000
TANAKPUR HPS NHPC LTD HYDRO-HYDRO 9420 43000 29600
URI HPS -I NHPC LTD HYDRO-HYDRO 48000 280300 16000
URI HPS - II NHPC LTD HYDRO-HYDRO 24000 147300 48600
NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 4500 24600 88200
SEWA - II NHPC LTD HYDRO-HYDRO 12000 47100 43400
ANTA CCPP NTPC LTD THERMAL-GASN 41930 67539 32400
AURAIYA CCPP NTPC LTD THERMAL-GASN 66336 53501 39100
BADARPUR TPS NTPC LTD THERMAL-COAL 70500 159153 44800
DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 84000 296170 42300
DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 98000 526686 46300
DADRI CCPP NTPC LTD THERMAL-GASHSD 82978 227469 33000
FARIDABAD CCPP NTPC LTD THERMAL-GASN 43159 115577 30800
RIHAND STPS I NTPC LTD THERMAL-COAL 100000 596766 24500
RIHAND STPS II NTPC LTD THERMAL-COAL 100000 737069 24600
RIHAND STPS III NTPC LTD THERMAL-COAL 100000 706546 30600
SINGRAULI STPS NTPC LTD THERMAL-COAL 200000 1394068 20400
TANDA TPS NTPC LTD THERMAL-COAL 44000 295438 40800
UNCHAHAR TPS I NTPC LTD THERMAL-COAL 42000 256454 39800
UNCHAHAR TPS II NTPC LTD THERMAL-COAL 42000 273577 38900
UNCHAHAR TPS III NTPC LTD THERMAL-COAL 21000 142780 43000
KOLDAM NTPC LTD HYDRO-HYDRO 80000 363260 43600
NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 303575 25841
RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 108000 668677 35374
NJHPS SJVNL HYDRO-HYDRO 150000 699496 23820
RAMPUR HPS SJVNL HYDRO-HYDRO 41202 195982 32260
TEHRI HPP THDC HYDRO-HYDRO 100000 272543 51800
KOTESHWAR HEP THDC HYDRO-HYDRO 40000 106244 53400
IGSTPS JHAJJAR ARAVALI P CPL THERMAL-COAL 150000 510429 49490
NEYVELI BARSINGSAR NEYVELI LIG CORP LTD THERMAL-LIG 25000 127520 38040
STATE SECTOR
PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 21000 14222 48200
PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 21000 19205 48400
PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 25000 102257 42600
PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 25000 62107 41800
DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 60000 312213 41000
RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 120000 35767442200
WYC HYDEL STATION HPGCL HYDRO-HYDRO 6240 20365 24900
GIRI POWER HOUSE HPSEB HYDRO-HYDRO 6000 13958 7600
ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 1695 5467 11900
BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 12000 18528 6700
GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 2250 7462 22500
BASSI POWER HOUSE HPSEB HYDRO-HYDRO 6600 29649 7500
BINWA POWER HOUSE HPSEB HYDRO-HYDRO 600 2749 19300
ANNEXURE-I
RATE OF SALE OF POWER FOR THE YEAR 2016-2017
Page 33
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) GAJ POWER HOUSE HPSEB HYDRO-HYDRO 1050 2914 26700
BANER POWER HOUSE HPSEB HYDRO-HYDRO 1200 2864 16200
HOLI POWER HOUSE HPSEB HYDRO-HYDRO 300 616 22500
THIROT POWER HOUSE HPSEB HYDRO-HYDRO 450 1126 22500
KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 1200 3064 22500
LARJI POWER HOUSE HPSEB HYDRO-HYDRO 12600 53677 23700
NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 250 750 31000
CHABA POWER HOUSE HPSEB HYDRO-HYDRO 175 465 23300
RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 150 101 13400
SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 200 000 22500
KILLAR HPSEB HYDRO-HYDRO 030 050 22500
BHABA AUGUMENP H HPSEB HYDRO-HYDRO 450 1276 22500
BS CHAMBA HPSEB HYDRO-HYDRO 045 099 19500
GUMMA HPSEB HYDRO-HYDRO 300 423 22500
GAS TURBINE POWER STATION IPGCL THERMAL-GAS 27000 67233 39300
PPS-I PPCL THERMAL-GAS 33000 175905 38300
PPS-III PPCL THERMAL-GAS 137120 196879 36100
LOWER JHELUM JampKPDD HYDRO-HYDRO 10500 60214 5100
UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 2260 10514 6300
UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 10500 44202 8500
GANDHARBAL JampKPDD HYDRO-HYDRO 1500 8925 4700
KARNAH MPH JampKPDD HYDRO-HYDRO 200 1122 31000
CHENANI I JampKPDD HYDRO-HYDRO 2330 10892 6600
CHENANI II JampKPDD HYDRO-HYDRO 200 1188 9300
CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 750 3634 14200
IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 375 2108 18500
IGO MERCHELLONG JampKPDD HYDRO-HYDRO 300 1572 29700
PAHALGAM MHP JampKPDD HYDRO-HYDRO 450 1713 32900
MARPACHOO JampKPDD HYDRO-HYDRO 075 375 29800
HAFTAL JampKPDD HYDRO-HYDRO 100 483 28700
SANJAK JampKPDD HYDRO-HYDRO 126 441 36000
SEWA-III JampKPDD HYDRO-HYDRO 900 3273 20200
BHADERWAH JampKPDD HYDRO-HYDRO 150 935 8900
BAZGO JampKPDD HYDRO-HYDRO 030 108 33300
SUMOOR JampKPDD HYDRO-HYDRO 010 045 35400
HUNDER JampKPDD HYDRO-HYDRO 040 176 26200
STAKNA JampKPDD HYDRO-HYDRO 400 1933 4100
KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 124000 662879 31360
SURATGARH TPS RRVUNL THERMAL-COAL 150000 402328 41730
CHHABRA TPS 1amp 2 RRVUNL THERMAL-COAL 50000 305946 36700
CHHABRA TPS 3 RRVUNL THERMAL-COAL 25000 151536 36700
CHHABRA TPS 4 RRVUNL THERMAL-COAL 25000 155896 36700
RAMGARH GT POWER PROJECT RRVUNL THERMAL-COAL 22050 43177 41800
RAMGARH GAS T P PROJECT 3 RRVUNL THERMAL-GAS 5000 93615 41800
DHOLPUR C C POWER PROJECT RRVUNL THERMAL-R-LNG 33000 9486 46110
MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 14000 20855 34192
MINI MICRO HYDEL (MMH) P S RRVUNL HYDRO-HYDRO 2385 851 37800
KALISINDH TPP 1 RRVUNL THERMAL-COAL 60000 341543 45000
KALISINDH TPP 2 RRVUNL THERMAL-COAL 60000 211588 45000
KHARA HEP UPJVNL HYDRO-HYDRO 7200 26654 7200
MATATILLA HEP UPJVNL HYDRO-HYDRO 3060 12219 6500
OBRA HEP UPJVNL HYDRO-HYDRO 9900 21517 6300
RIHAND UPJVNL HYDRO-HYDRO 30000 57369 5500
ANPARA A TPS UPRVUNL THERMAL-COAL 63000 317536 27000
ANPARA B TPS UPRVUNL THERMAL-COAL 100000 705605 22700
ANPARA D UPRVUNL THERMAL-COAL 100000 300158 39800
HARDUAGANJ TPS UPRVUNL THERMAL-COAL 16500 45817 49200
HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 50000 304389 46600
OBRA A TPS UPRVUNL THERMAL-COAL 28800 13158 34000
OBRA B TPS UPRVUNL THERMAL-COAL 100000 328124 21900
Page 34
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) PANKI TPS UPRVUNL THERMAL-COAL 21000 66488 50300
PARICHHA TPS UPRVUNL THERMAL-COAL 22000 38762 49400
PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 42000 231931 45600
PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 50000 276722 50400
CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 24000 70845 8290
CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 14400 75366 8390
DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 3375 9595 12080
DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 5100 18701 10520
KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4140 17359 12330
KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 12000 33001 9420
KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 3000 11953 8320
TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 9000 33983 12460
MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 30400 124510 16110
RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 19800 17897 10550
MPUR UTTARAKHAND JVNL HYDRO-HYDRO 930 5121 19200
PATHRI UTTARAKHAND JVNL HYDRO-HYDRO 2040 11636 14200
GALOGI UTTARAKHAND JVNL HYDRO-HYDRO 300 648 12500
PRIVATE SECTOR
MGTPP CLP INDIA PVT LTD THERMAL-COAL 132000 268902 41940
SHRINAGAR HEP ALAKNANDA HPCL HYDRO-HYDRO 33000 127414 48800
GAMA INFRAPROP CCPP GAMA INFRAPROP PVT THERMAL-GAS 22500 52686 47000
PPGCL (BARA) JP POWER VENTURES LTD THERMAL-COAL 198000 448200 38500
MALANA HEP MALANA PCL HYDRO-HYDRO 8600 26354 29792
MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 10000 30369 32580
ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 19200 56347 36079
KASHANG HEP H P PCL HYDRO-HYDRO 19500 5034 29200
BASPA-II HEP HBPCL HYDRO-HYDRO 30000 132769 13600
KARCHAM WANGTOO HEP HBPCL HYDRO-HYDRO 100000 434386 36600
RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 108000 582600 43700
RITHALA COMBI CY POWER PLANT TATA POWER DDL THERMAL-GAS 9480 000 11900
RAJPURA TPS NABHA POWER LTD THERMAL-GAS 140000 901484 39000
TALWANDI SABO POWER LTD TALWANDI SABO POWER LTD THERMAL-COAL 198000 636040 49548
ROJA THERMAL POWER STATION ROJA POWER SCL THERMAL-COAL 120000 727200 43400
KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 34400 63400
BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 36000 62600
MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 38200 60800
UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 37900 61500
KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 42300 58800
LALITPUR PGCL BAJAJ ENERGY PVT LTD THERMAL-COAL 198000 359400 47300
PRAYAGRAJ PGCL PRAYAGRAJ PGCL THERMAL-COAL 132000 448200 38595
KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 132000 783182 33438
WESTERN REGION
CENTRAL SECTOR
INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 100000 325333 23892
OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 52000 141663 34001
GANDHAR CCPP NTPC LTD THERMAL-GAS 65739 221924 28700
KAWAS CCPP NTPC LTD THERMAL-GASN 65620 167929 27000
KORBA I amp II NTPC LTD THERMAL-COAL 210000 1499171 20500
KORBA III NTPC LTD THERMAL-COAL 50000 358746 26600
SIPAT STPS I NTPC LTD THERMAL-COAL 198000 1479902 26800
SIPAT STPS II NTPC LTD THERMAL-COAL 100000 766549 26500
VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 126000 693142 25800
VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 100000 608781 23800
VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 100000 673475 27600
VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 100000 655924 32900
VINDHYACHAL STPS V NTPC LTD THERMAL-COAL 50000 328265 31700
MOUDA I NTPC LTD THERMAL-COAL 100000 343130 44500
MOUDA Ii NTPC LTD THERMAL-COAL 66000 40637 39900
RATNAGIRI GAS amp POWER PVT LTD RGPPL THERMAL-GAS 196708 442485 47000
KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 000 24729
TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 32000 201227 10740
Page 35
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 365122 19069
TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 787444 29324
STATE SECTOR
GSEG-HAZIRA15610 MW GUJARAT S ENEGEN LTD THERMAL-GAS 15610 1805 28200
GSEG-HAZIRA35143 MW GUJARAT S ENEGEN LTD THERMAL-GAS 35130 22276 51300
GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 21978 51800
AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 13929 26100
KORBA TPS EAST CSPGCL THERMAL-COAL 44000 198673 33880
DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 365808 27570
KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 316500 30420
HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 532878 19410
CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 515 58300
MTTPS CHAMPA U-I CSPGCL THERMAL-COAL 50000 220376 39000
MTTPS CHAMPA U-II CSPGCL THERMAL-COAL 50000 23709 10000
SHP GANGREL CSPGCL HYDRO-HYDRO 1000 2350 36790
BANGO HEP CSPGCL HYDRO-HYDRO 12000 14662 8900
MHP KORBA WEST CSPGCL HYDRO-HYDRO 170 859 38190
SIKASAR HEP CSPGCL HYDRO-HYDRO 700 418 26870
DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8843 74500
DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 19446 51500
GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 66388 71600
GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127488 41300
KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 96072 43900
KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 29841 56400
SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 184966 58800
UKAI 1-5 GSECL THERMAL-COAL 85000 204891 46900
UKAI TPS 6 GSECL THERMAL-COAL 50000 284448 48200
WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 271999 58300
WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 82808 44100
KADANA HPS GSECL HYDRO-HYDRO 24200 34433 16800
UKAI HPS GSECL HYDRO-HYDRO 30500 40585 6100
TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 123000 11500
BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 8900 10900
BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 7200 27500
JHINNA HPS MPPGCL HYDRO-HYDRO 2000 9700 18500
RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 44300 3400
GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 17300 4600
SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 4100 16900
MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 14600 27000
PENCH HPS MPPGCL HYDRO-HYDRO 16000 23700 8100
RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 3000 16900
AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 134400 35100
SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 283800 38700
SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 344600 34300
SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 111600 61600
SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 211800 58000
SSTPS PH-I MPPGCL THERMAL-COAL 120000 233100 84300
BHUSAWAL TPS MSPGCL THERMAL-COAL 142000 566258 51100
CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1365682 33700
KHAPERKHEDA MSPGCL THERMAL-COAL 134000 706207 39100
KORADI TPS MSPGCL THERMAL-COAL 62000 443206 42000
NASIK TPS MSPGCL THERMAL-COAL 63000 297275 47000
PARLI TPS MSPGCL THERMAL-COAL 113000 175934 71600
PARAS MSPGCL THERMAL-COAL 50000 267931 38700
URAN CCPP MSPGCL THERMAL-GAS 67200 320330 30600
KOYANA MSPGCL HYDRO-HYDRO 195600 328155 13100
SMALL HYDRO POWER PLANTS MSPGCL HYDRO-HYDRO 45400 93062 30500
BHIRA MSPGCL HYDRO-HYDRO 8000 10046 8400
TILLARI MSPGCL HYDRO-HYDRO 8900 10584 3100
SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 233298 20500
SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 87633 20500
PRIVATE SECTOR
Page 36
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 81282 46750
JNSTPP(JAYPEE NIGRIE) JP POWER VENTURES LTD THERMAL-COAL 132000 726695 29310
MB POWER MB POWER THERMAL-COAL 120000 345632 38310
ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 754922 28671
ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 780761 23495
ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 198000 1263784 32090
ADANI POWER MAHARA ADANI POWER LTD THERMAL-COAL 330000 1666191 34124
AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 170065 36827
SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 252035 45129
ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 458551 36000
ESSAR POWER MP LTD ESSAR POWER MP LTD THERMAL-COAL 60000 243040 28600
VEDANTA LTD (P P -I) VEDANTA LTD THERMAL-GAS 3000 15044 24000
VEDANTA LTD (P P -II) VEDANTA LTD THERMAL-GAS 3000 21293 24000
PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 8234600 24000
165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 5850 64390
145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 68717 40349
SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 132655 28776
SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 144686 38567
MUNDRA UMPPCOASTAL GUJARAT POWER
LTD THERMAL-IMP COAL 400000 2530300
23900
LANCO AMARKANTAK TPP PATHADIH
U-ILANCO AMARKAN POWER LTD THERMAL-COAL 30000 195500
29200
LANCO AMARKANTAK TPP PATHADIH
U-IILANCO AMARKAN POWER LTD THERMAL-COAL 30000 206900
27600
BARADARHA TPS D B POWER LTD THERMAL-COAL 120000 677373 29200
JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 405000 28900
JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 453000 40500
DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 339437 40700
TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 293400 44000
TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 137200 37000
TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 174900 44000
BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 92900 14100
BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23700 34300
KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 27600 48300
CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2530300 23900
BHANDARDRA HEP -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 2475 54900
SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 161400 26500
SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 445000 39000
SOTHERN REGION
CENTRAL SECTOR
NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 325699 54820
NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 305532 39880
NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 998805 38510
NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 113016 54070
NEYVELI TAMILNADU POWER LTD JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 625274 42200
VALLUR TPS NTPC TECL THERMAL-COAL 150000 856438 42350
R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 1493 84300
RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1502919 29400
RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 341291 31800
SIMHADRI I NTPC LTD THERMAL-COAL 100000 688382 36800
SIMHADRI II NTPC LTD THERMAL-COAL 100000 663657 43400
KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 593110 31324
MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 291625 21764
KKNPP-1 amp 2 NPCIL NUCLEAR-NUCLEAR 200000 572609 40948
MINICOY LAKSHADEEP THERMAL-DIESEL 340 770 29600
KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1097 29600
AMINI LAKSHADEEP THERMAL-DIESEL 265 509 29600
ANDROTT LAKSHADEEP THERMAL-DIESEL 219 524 29600
KALPENI LAKSHADEEP THERMAL-DIESEL 175 356 29600
AGATTI LAKSHADEEP THERMAL-DIESEL 195 658 29600
KADMAT LAKSHADEEP THERMAL-DIESEL 190 414 29600
KILTAN LAKSHADEEP THERMAL-DIESEL 150 269 29600
CHETLET LAKSHADEEP THERMAL-DIESEL 100 139 29600
BITRA LAKSHADEEP THERMAL-DIESEL 043 024 29600
BANGARAM LAKSHADEEP THERMAL-DIESEL 018 009 29600
Page 37
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) STATE SECTOR
Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 721811 46500
Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 50000 336142 46500
RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 237358 46500
RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 239926 46500
RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 124500 46500
SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 62109 46500
UPPER SILERU APGENCO HYDRO-HYDRO 24000 33000 46500
LOWER SILERU APGENCO HYDRO-HYDRO 46000 81066 46500
DONKARAI APGENCO HYDRO-HYDRO 2500 6007 46500
PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 1262 46500
CHETTIPETA APGENCO HYDRO-HYDRO 100 214 46500
MUCHKUND APGENCO HYDRO-HYDRO 12000 37571 46500
NAGARJUNASAGAR RCPH APGENCO HYDRO-HYDRO 9000 606 46500
TUNGABHADRA HES amp HAMPI(AP
Share)
APGENCO HYDRO-HYDRO 7200 6100 46500
KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 352232 42600
KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 288131 32500
KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 319272 46500
RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 40073 44300
KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 308317 46000
KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 308963 51300
SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 61004 76600
NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 17960 75300
PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 20873 58300
POCHAMPAD-I TSPGENCO HYDRO-HYDRO 2700 5455 29800
POCHAMPAD-II TSPGENCO HYDRO-HYDRO 900 1932 40700
NIZAMSAGAR TSPGENCO HYDRO-HYDRO 1000 1126 53400
RAICHUR TPS 1 to 7 KPCL THERMAL-COAL 147000 890866 43800
RAICHUR TPS 8 KPCL THERMAL-COAL 25000 159523 48200
BELLARI TPS 1 KPCL THERMAL-COAL 50000 318679 51100
BELLARI TPS 2 KPCL THERMAL-COAL 50000 232347 55600
BELLARI TPS 3 KPCL THERMAL-COAL 70000 47565 34400
BHADRA PH KPCL HYDRO-HYDRO 3920 2369 45900
GERUSUPPA PH KPCL HYDRO-HYDRO 24000 26990 22000
GHAT PRABHA HEP KPCL HYDRO-HYDRO 3200 4777 25300
KADRA HPS KPCL HYDRO-HYDRO 15000 16889 26800
NAGJHARI KPCL HYDRO-HYDRO 90000 155159 9800
KODASALLI DPH KPCL HYDRO-HYDRO 12000 14854 19200
MUNIRA+MGH+SPH+SPH KPCL HYDRO-HYDRO 22640 48211 7900
SHARAVATHY HPS KPCL HYDRO-HYDRO 108550 276215 5400
ALMATTI DPH KPCL HYDRO-HYDRO 29000 39611 24600
VARAHI UGPH KPCL HYDRO-HYDRO 46000 71368 15600
IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 17196 15300
IDUKKI HPS KSEB HYDRO-HYDRO 78000 137905 15300
KAKKAD HPS KSEB HYDRO-HYDRO 5000 13063 15300
KALLADA HPS KSEB HYDRO-HYDRO 1500 4436 15300
KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 46544 15300
KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 635 15300
LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 30822 15300
MALANKARA HPS KSEB HYDRO-HYDRO 1050 2474 15300
MATTUPETTY KSEB HYDRO-HYDRO 200 230 15300
MALAMPUZHA KSEB HYDRO-HYDRO 250 063 15300
CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 864 15300
URUMI ST I amp II KSEB HYDRO-HYDRO 615 903 15300
LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 248 15300
NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7765 19625 15300
PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 16601 15300
PANNIAR HPS KSEB HYDRO-HYDRO 3240 6217 15300
PORINGALKUTHU KSEB HYDRO-HYDRO 3600 10052 15300
PORINGALKUTHU LBE KSEB HYDRO-HYDRO 1600 9438 15300
PEPPARA KSEB HYDRO-HYDRO 300 395 15300
POOZHITHODE KSEB HYDRO-HYDRO 480 1045 15300
Page 38
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) PEECHI KSEB HYDRO-HYDRO 125 040 15300
RANI-PERUNADU KSEB HYDRO-HYDRO 400 585 15300
SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 79783 15300
SENGULAM HPS KSEB HYDRO-HYDRO 5120 11558 15300
SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 16711 15300
VILANGAD KSEB HYDRO-HYDRO 750 1578 15300
BARAPOLE KSEB HYDRO-HYDRO 1500 1932 15300
VELLATHOOVAL KSEB HYDRO-HYDRO 360 305 15300
CHIM0NY KSEB HYDRO-HYDRO 250 156 15300
ADYANPARA KSEB HYDRO-HYDRO 350 501 15300
BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 554 15300
KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 3801 15300
KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 23132 32800
ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 14416 62280
METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 523970 62280
METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 321270 62280
NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 336575 62280
NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 591240 62280
TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 508966 62280
KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 30897 62280
VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 18720 90699 62280
KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 33593 62280
BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 1047 62280
PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 1250 62280
PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 330 62280
MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 4897 62280
MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 032 62280
KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15681 62280
KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 40608 62280
KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 21342 62280
KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 4717 62280
KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4322 62280
KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2399 62280
METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 4416 62280
METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 8035 62280
BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2187 62280
BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2359 62280
BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2511 62280
BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 1949 62280
BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 1819 62280
POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 172 62280
SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 241 62280
MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 026 62280
THIRUMOORTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 136 62280
PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 9309 62280
VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 353 62280
SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 4192 62280
PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 6571 62280
SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 1186 62280
SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6319 62280
ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 6122 62280
KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 28674 62280
SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 18381 62280
SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 4258 62280
KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 12680 62280
KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4201 62280
ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 000 62280
PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 19175 62280
AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 078 62280
BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 504 62280
BHAVANI KATTALAI (BKB)(IIIampIII BB I amp II)TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 5847 62280
PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 000 62280
Page 39
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) SRI DAMODARAM STPS APPDCL THERMAL-COAL 160000 808108 36300
PRIVATE SECTOR
KARUPPUR TANJORE LANCO TANJORE PCL THERMAL-GAS 12000 48096 28770
SIMHAPURI ENERGY LTD SIMHAPURI ENERGY LTD THERMAL-COAL 60000 143900 39100
JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 7111 45500
SBU 1 JSW ENERGY LTD
VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 26000 159100
43300
SBU 2 JSW ENERGY LTD
VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 60000 247900
42800
LANCO KPLLANCO KONDAPALLI POWER
LTDTHERMAL-GAS 36814 85060
25776
LANCO KPL STG -IILANCO KONDAPALLI POWER
LTDTHERMAL-GAS 36600 12979
46330
LANCO KPL STG -IIIALANCO KONDAPALLI POWER
LTDTHERMAL-GAS 37100 85710
46330
LANCO KPL STG -III BLANCO KONDAPALLI POWER
LTDTHERMAL-GAS 37100 43639
46330
HINDUJA NATIONAL PCL HINDUJA NATIONAL PCL THERMAL-COAL 104000 303000 38200
MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 121164 49940
UDUPI POWER COR LTD ADANI POWER LTD THERMAL-COAL 120000 754613 42500
SPECTRUM POWER GENERATION
LTD SPECTRUM PG LTD THERMAL-GASN 20525 9256812
34952
TAQA NEYVELI POWER COM PVT
LTD TAQA NEYVELI THERMAL-LIG 25000 5840
34500
ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 251000 51000
ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 207860 36800
GMR VEMAGIRI POWER GENERATION
LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 30117
46450
EASTERN REGION
CENTRAL SECTOR
MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 64675 53113
MTPS STAGE - II KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 39000 1432 69138
BOKARO `B` TPS DVC THERMAL-COAL 63000 145670 31539
MEJIA TPS U 1-3 DVC THERMAL-COAL 63000 348298 31552
MEJIA TPS U 4 DVC THERMAL-COAL 21000 116099 34997
MEJIA TPS U 5-6 DVC THERMAL-COAL 50000 276427 35976
MEJIA TPS U 7-8 DVC THERMAL-COAL 100000 552854 36991
DURGAPUR STEEL TPS DVC THERMAL-COAL 100000 665550 39323
DURGAPUR TPS DVC THERMAL-COAL 21000 59270 35416
RAGHUNATHPUR TPS DVC THERMAL-COAL 120000 201650 35326
MAITHON HYDEL STA DVC HYDRO-HYDRO 6320 12200 17984
CHANDRAPURA TPSU1-3 DVC THERMAL-COAL 42000 257610 35095
CHANDRAPURA TPSU7-8 DVC THERMAL-COAL 50000 306673 34987
KODERMA TPS DVC THERMAL-COAL 100000 380180 38131
PANCHET HPS DVC HYDRO-HYDRO 8000 13360 17984
TILLAYA HPS DVC HYDRO-HYDRO 400 1410 17984
RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34700 35400
TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 277300 23200
TLDP -III NHPC LTD HYDRO-HYDRO 13200 55400 62000
TLDP -IV NHPC LTD HYDRO-HYDRO 16000 60300 25600
FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 957219 33700
FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 308943 41000
BONGAINGAON TPS NTPC LTD THERMAL-COAL 25000 153663 58600
KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 542277 34200
KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 942591 34200
BARH-II NTPC LTD THERMAL-COAL 132000 728021 44500
TALCHER TPS NTPC LTD THERMAL-COAL 46000 335521 30100
TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 702319 25600
TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1436521 24700
STATE SECTOR
BTPS(RampM) BIHAR STATE PGCL THERMAL-COAL 22000 12142 39700
BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 98331 10602
HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 50593 9482
CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 19689 2605
RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 53192 6033
UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 147208 14637
Page 40
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 60353 4519
IB TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 288567 25000
J P H GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 210 038 61100
MEYONG CHU GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 400 1086 61100
TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 122667 38200
DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 214339 43321
KOLAGHAT THERMAL POWER
STATION
WEST BENGAL PDCL THERMAL-COAL 126000 538269 31603
BAKRESHWAR THERMAL POWER
PLANT
WEST BENGAL PDCL THERMAL-COAL 105000 634876 32154
BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 45000 166855 33299
SANTHALDIH THERMAL POWER
STATION
WEST BENGAL PDCL THERMAL-COAL 50000 336442 34932
SAGARDIGHI THERMAL POWER
PROJECT
WEST BENGAL PDCL THERMAL-COAL 160000 423121 34705
JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 20344 68900
RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 24559 68900
TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 4623 68900
PURULIA PUMPED STORAGE
PROJECT
WEST BENGAL SEDCL HYDRO-HYDRO 90000 108816 68900
MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2768 68900
PRIVATE SECTOR
CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 49474 20230
CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 555500 70200
HALDIA ENERGY HALDIA ENERGY LTD THERMAL-COAL 60000 371000 50400
DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3688 63400
KAMALANGA TPS GMR KAMALANGA ENERGY LTD THERMAL-COAL 105000547670
33300
ADHUNIK POWER U-1 ADHUNIK POWER THERMAL-COAL 27000 158 44060
ADHUNIK POWER U-2 ADHUNIK POWER THERMAL-COAL 27000 168 44250
VL-JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 332800 23622
JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 43000 45250
JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 71700 37030
JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 70700 35920
JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 71100 38870
JOJOBERA UNIT 5 TATA POWER COM LTD THERMAL-COAL 12000 79300 44560
JOJOBERA UNIT 6 TATA POWER COM LTD THERMAL-WHR 12000 83700 12840
IEL KALINGANAGAR U-I TATA POWER COM LTD THERMAL-WG 6750 33400 22500
IEL KALINGANAGAR U-II TATA POWER COM LTD THERMAL-WG 6750 34800 22500
MAITHON UNIT 1 amp 2 TATA POWER COM LTD THERMAL-COAL 105000 678000 36100
HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 27500 24340
HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 28400 24340
HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 15800 24310
NORTH EASTERN REGION
CENTRAL SECTOR
LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 74100 36600
AGARTALA GT NEEPCO THERMAL-GAS 13500 88611 27210
ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 153111 32310
DOYANG HEP NEEPCO HYDRO-HYDRO 7500 25598 49801
KOPILI HEP NEEPCO HYDRO-HYDRO 20000 98186 11491
KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 19582 20237
KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 10310 17968
RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 124093 22945
TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 10100 17344 39000
STATE SECTOR
HYDRO POWER (122 Stns) ITANAGAR GOVT OF ARUNACHAL
PRADESHHYDRO-HYDRO 6971 6217270
24600
KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39514 17337
LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 82327 36810
NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 33318 48290
MYNTRIANG SHEP ST II ASSAM POWER GENCO HYDRO-HYDRO 300 567 35776
LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 9130 49200
LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 012 49200
DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 022 49200
TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 000 49200
UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 4990 16000
UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 6476 37000
UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 16494 14600
UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 3600 9556 15000
SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 758 8000
MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44070 44800
KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 154 41400
TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 091 41400
MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 411 41400
MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 394 41400
KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 760 41400
SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 3264 41400
LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 044 41400
BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 18953 28000
ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 43585 28200
GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 4080 11100
Note
LIG Lignite N Naptha WHR Waste Heat Recovery
Page 41
SN Contents Page
1 Electricity Generation (MU) Targets and Achievements for 2019-20 22
Section E - Electricity Generation
Programme Achievement Ach Programme Achievement Ach
Central Sector 37545100 3177900 3129530 9848 3177900 3129530 9848
State Sector 37498600 3322500 2950558 8881 3322500 2950558 8881
PvtIPP Sector 37346200 3236400 3195940 9875 3236400 3195940 9875
PvtUTL Sector 1823100 159300 165579 10394 159300 165579 10394
Total 114213000 9896100 9441607 9541 9896100 9441607 9541
Central Sector 5661700 386100 481390 12468 386100 481390 12468
State Sector 6680500 498200 536514 10769 498200 536514 10769
PvtIPP Sector 1206900 57300 80405 14032 57300 80405 14032
PvtUTL Sector 144100 12300 10930 8886 12300 10930 8886
Total 13693200 953900 1109239 11628 953900 1109239 11628
Central Sector 4472000 367300 317765 8651 367300 317765 8651
Total 4472000 367300 317765 8651 367300 317765 8651
Bhutan Import 621800 17500 24396 13941 17500 24396 13941
Central Sector 47678800 3931300 3928685 9993 3931300 3928685 9993
State Sector 44179100 3820700 3487072 9127 3820700 3487072 9127
Pvt Sector 40520300 3465300 3452854 9964 3465300 3452854 9964
Total 133000000 11234800 10893007 9696 11234800 10893007 9696
Provisional based on actual-cum-Assesment
Figs in MU
Cummulative
Achievement
Cummulative
Achievement
Mar-19 Mar-18 Upto Mar-2019 Upto Mar-2018
984785 869291 12675910 10183949
22
1 Electricity Generation (MU) Targets and Achievememts for 2019-20
All India Energy Generation During Apr-19 to Apr-19 (MU)
Target (2019-20)Apr-19 to Apr-19
Sector
Hydro
Thermal
Nuclear
Renewable Energy Generation
Achievement
Apr-2019
98961
95393673
112348
94416
11092
3178
108930
0
20000
40000
60000
80000
100000
120000
Thermal Hydro Nuclear Total
Programme
Achievement
SN Contents Page
1 Energy Power Supply Position (Provisional) for Apr-2019 and during Apr-19 to Apr-19 23
2 Peak Power Supply Position (Provisional) for Apr-2019 and during Apr-19 to Apr-19 24
3 Energy Power Supply Position (Revised) for Mar-2019 and during Apr-19 to Mar-19 25
4 Peak Power Supply Position (Revised) for Mar-2019 and during Apr-19 to Mar-19 26
5 Notified Power cuts Restrictions on Industries during Apr-2019 27
6 Power Supply to Agricultural Sector during Apr-2019 28
Section F - Power supply position
आकड़ मममलयन यननट नट Figures in MU net
ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied
कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )
चडीगढ़ Chandigarh 117 117 0 00 117 117 0 00
दिलली Delhi 2698 2698 1 00 2698 2698 1 00
हरियजणज Haryana 3773 3773 0 00 3773 3773 0 00
दहमजचल परिश Himachal Pradesh 777 777 0 00 777 777 0 00
रमम कशमीि Jammu amp Kashmir 1604 1296 308 192 1604 1296 308 192
परजब Punjab 3646 3646 0 00 3646 3646 0 00
िजरसथजन Rajasthan 6210 6208 2 00 6210 6208 2 00
उतति परिश Uttar Pradesh 10179 10148 32 03 10179 10148 32 03
उततिजखड Uttarakhand 1120 1120 0 00 1120 1120 0 00
उततरी कषतर Northern Region 30094 29786 308 10 30094 29786 308 10
छततीसगढ़ Chhattisgarh 2684 2676 8 03 2684 2676 8 03
गरिजत Gujarat 10718 10718 0 00 10718 10718 0 00
मधय परिश Madhya Pradesh 6006 6006 0 00 6006 6006 0 00
महजिजषटर Maharashtra 14308 14308 0 00 14308 14308 0 00
िमन औि दिउ Daman amp Diu 220 220 0 00 220 220 0 00
िजिि व नगि हवली Dadra amp Nagar Haveli 552 552 0 00 552 552 0 00
गोवज Goa 388 388 0 00 388 388 0 00
पशचिमी कषतर Western Region 34875 34868 8 00 34875 34868 8 00
आनधर परिश Andhra Pradesh 5708 5708 0 00 5708 5708 0 00
तलगजनज Telangana 5725 5725 0 00 5725 5725 0 00
कनजाटक Karnataka 7003 7003 0 00 7003 7003 0 00
किल Kerala 2402 2400 2 01 2402 2400 2 01
तममल नजड Tamil Nadu 10010 10010 0 00 10010 10010 0 00
पडचिी Puducherry 263 263 0 00 263 263 0 00
लकष-दवीप Lakshadweep 4 4 0 0 4 4 0 0
दकषकषणी कषतर Southern Region 31111 31109 2 00 31111 31109 2 00
बबहजि Bihar 2589 2589 0 00 2589 2589 0 00
िजमोिि घजटी ननगम DVC 1772 1772 0 00 1772 1772 0 00
झजिखणड Jharkhand 689 689 0 00 689 689 0 00
ओडडशज Odisha 2689 2689 1 00 2689 2689 1 00
पशशचम बगजल West Bengal 5075 5075 0 00 5075 5075 0 00
मसशककम Sikkim 37 37 0 00 37 37 0 00
अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 7 29 27 2 7
परवी कषतर Eastern Region 12851 12850 1 00 12851 12850 1 00
अरणजचल परिश Arunachal Pradesh 66 66 0 05 66 66 0 05
असम Assam 766 709 57 75 766 709 57 75
मणणपि Manipur 68 67 1 15 68 67 1 15
मघजलय Meghalaya 170 160 10 59 170 160 10 59
ममज़ोिम Mizoram 54 53 0 08 54 53 0 08
नजगजलड Nagaland 54 54 0 08 54 54 0 08
बिपिज Tripura 122 120 1 12 122 120 1 12
उततर-परवी कषतर North-Eastern Region 1300 1228 71 55 1300 1228 71 55
समपणण भारत All India 110231 109842 389 04 110231 109842 389 04
23
ऊरजा पनत ा म कमी ऊरजा पनत ा म कमीEnergy not Supplied
Excludes energy exported to Bangladesh
Energy not Supplied
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
ऊराण वरवदयत आपरत ण शथिरत ररपोरण (परवाणरवलोकन) Energy Power Supply Position Report (Provisional)
राजयState
अपरल 2019 April2019 अपरल2019 -अपरल2019 April2019 to April2019
अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met
कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )
चडीगढ़ Chandigarh 256 256 0 00 256 256 0 00
दिलली Delhi 5664 5664 0 00 5664 5664 0 00
हरियजणज Haryana 8127 8127 0 00 8127 8127 0 00
दहमजचल परिश Himachal Pradesh 1387 1387 0 00 1387 1387 0 00
रमम कशमीि Jammu amp Kashmir 2826 2261 565 200 2826 2261 565 200
परजब Punjab 7015 7015 0 00 7015 7015 0 00
िजरसथजन Rajasthan 10560 10560 0 00 10560 10560 0 00
उतति परिश Uttar Pradesh 19935 19935 0 00 19935 19935 0 00
उततिजखड Uttarakhand 1922 1922 0 00 1922 1922 0 00
उततरी कषतर Northern Region 54476 53985 491 09 54476 53985 491 09
छततीसगढ़ Chhattisgarh 4596 4574 22 05 4596 4574 22 05
गरिजत Gujarat 17871 17865 6 00 17871 17865 6 00
मधय परिश Madhya Pradesh 10018 10018 0 00 10018 10018 0 00
महजिजषटर Maharashtra 23158 23150 8 00 23158 23150 8 00
िमन औि दिउ Daman amp Diu 341 340 1 02 341 340 1 02
िजिि व नगि हवली Dadra amp Nagar Haveli 818 818 0 00 818 818 0 00
गोवज Goa 594 594 0 00 594 594 0 00
पशचिमी कषतर Western Region 56242 56222 20 00 56242 56222 20 00
आनधर परिश Andhra Pradesh 9151 9151 0 00 9151 9151 0 00
तलगजनज Telangana 10191 10191 0 00 10191 10191 0 00
कनजाटक Karnataka 12681 12681 0 00 12681 12681 0 00
किल Kerala 4309 4300 8 02 4309 4300 8 02
तममल नजड Tamil Nadu 15972 15972 0 00 15972 15972 0 00
पडचिी Puducherry 482 480 2 05 482 480 2 05
लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0
दकषकषणी कषतर Southern Region 49155 49103 52 01 49155 49103 52 01
बबहजि Bihar 5357 5357 0 00 5357 5357 0 00
िजमोिि घजटी ननगम DVC 3039 3039 0 00 3039 3039 0 00
झजिखणड Jharkhand 1266 1266 0 00 1266 1266 0 00
ओडडशज Odisha 5389 5389 0 00 5389 5389 0 00
पशशचम बगजल West Bengal 8666 8666 0 00 8666 8666 0 00
मसशककम Sikkim 100 100 0 00 100 100 0 00
अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7
परवी कषतर Eastern Region 23349 23349 0 00 23349 23349 0 00
अरणजचल परिश Arunachal Pradesh 139 136 3 22 139 136 3 22
असम Assam 1712 1667 45 26 1712 1667 45 26
मणणपि Manipur 197 188 9 46 197 188 9 46
मघजलय Meghalaya 336 336 0 00 336 336 0 00
ममज़ोिम Mizoram 116 113 3 26 116 113 3 26
नजगजलड Nagaland 157 131 26 166 157 131 26 166
बिपिज Tripura 292 291 1 03 292 291 1 03
उततर-परवी कषतर North-Eastern Region 2848 2780 68 24 2848 2780 68 24
समपणण भारत All India 177411 176810 601 03 177411 176810 601 03
24
मजग की पनत ा म कमी Demand not Met
Excludes the supply to Bangladesh
राजयStateअपरल 2019 April2019
मजग की पनत ा म कमी Demand not Met
अधिकतम वरवदयत आपरत ण शथिरत ररपोरण (परवाणरवलोकन) Peak Power Supply Position Report (Provisional)
आकड़ मगज वजट नट Figures in MW netअपरल2019 -अपरल2019 April2019 to April2019
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
आकड़ मममलयन यननट नट Figures in MU net
ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied
कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )
चडीगढ़ Chandigarh 96 96 0 00 1561 1561 0 00
दिलली Delhi 1931 1930 1 00 32299 32282 17 01
हरियजणज Haryana 3658 3658 0 00 53665 53665 0 00
दहमजचल परिश Himachal Pradesh 832 830 2 02 9850 9618 232 24
रमम कशमीि Jammu amp Kashmir 1767 1414 353 200 19593 15868 3725 190
परजब Punjab 3585 3585 0 00 55288 55275 13 00
िजरसथजन Rajasthan 6774 6770 4 01 79826 79637 189 02
उतति परिश Uttar Pradesh 8754 8691 63 07 117101 116118 984 08
उततिजखड Uttarakhand 1067 1067 0 00 13845 13753 92 07
उततरी कषतर Northern Region 28464 28041 423 15 383028 377776 5251 14
छततीसगढ़ Chhattisgarh 2464 2457 8 03 26130 26076 54 02
गरिजत Gujarat 9890 9890 0 00 116588 116572 15 00
मधय परिश Madhya Pradesh 6236 6236 0 00 75667 75665 2 00
महजिजषटर Maharashtra 13631 13631 0 00 158285 158148 137 01
िमन औि दिउ Daman amp Diu 221 221 0 00 2557 2557 0 00
िजिि व नगि हवली Dadra amp Nagar Haveli 553 553 0 00 6317 6317 0 00
गोवज Goa 362 362 0 00 4283 4280 3 01
पशचिमी कषतर Western Region 33357 33349 8 00 389827 389615 212 01
आनधर परिश Andhra Pradesh 6072 6071 1 00 63735 63677 58 01
तलगजनज Telangana 6930 6929 1 00 66697 66635 62 01
कनजाटक Karnataka 7614 7612 1 00 71759 71690 69 01
किल Kerala 2489 2488 1 00 25029 24911 118 05
तममल नजड Tamil Nadu 10247 10245 2 00 109375 109273 102 01
पडचिी Puducherry 252 251 1 04 2761 2751 10 03
लकष-दवीप Lakshadweep 4 4 0 0 46 46 0 0
दकषकषणी कषतर Southern Region 33605 33597 8 00 339355 338938 417 01
बबहजि Bihar 2319 2318 1 00 30052 29827 225 07
िजमोिि घजटी ननगम DVC 1773 1772 1 00 22365 21995 369 17
झजिखणड Jharkhand 698 697 1 01 8682 8461 221 25
ओडडशज Odisha 2583 2582 1 00 31810 31781 30 01
पशशचम बगजल West Bengal 4585 4584 2 00 52237 52078 159 03
मसशककम Sikkim 41 41 0 00 513 512 0 01
अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 67 346 323 23 67
परवी कषतर Eastern Region 11999 11995 5 00 145658 144654 1004 07
अरणजचल परिश Arunachal Pradesh 61 60 0 06 864 855 9 10
असम Assam 680 656 23 34 9532 9204 328 34
मणणपि Manipur 68 68 1 09 916 906 10 11
मघजलय Meghalaya 173 173 0 03 1955 1953 1 01
ममज़ोिम Mizoram 50 49 0 09 668 661 8 12
नजगजलड Nagaland 58 57 1 20 902 809 93 103
बिपिज Tripura 150 150 0 00 1859 1837 21 11
उततर-परवी कषतर North-Eastern Region 1240 1214 26 21 16696 16225 471 28
समपणण भारत All India 108665 108196 469 04 1274564 1267209 7355 06
Note The revised data for March 2019 is not avaliable
Excludes energy exported to Bangladesh
राजयState
ऊराण वरवदयत आपरत ण शथिरत ररपोरण (परवाणरवलोकन) Energy Power Supply Position Report (Provisional)
25
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
Energy not Supplied Energy not Supplied
मािण2019 March2019 अपरल2018 -मािण2019 April2018 to March2019
ऊरजा पनत ा म कमी ऊरजा पनत ा म कमी
अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met
कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )
चडीगढ़ Chandigarh 223 223 0 00 369 369 0 00
दिलली Delhi 4016 4016 0 00 7016 7016 0 00
हरियजणज Haryana 6544 6544 0 00 10270 10270 0 00
दहमजचल परिश Himachal Pradesh 1683 1683 0 00 1700 1700 0 00
रमम कशमीि Jammu amp Kashmir 3277 2622 655 200 3277 2622 655 200
परजब Punjab 6564 6564 0 00 12638 12638 0 00
िजरसथजन Rajasthan 11885 11885 0 00 13276 13276 0 00
उतति परिश Uttar Pradesh 16220 16220 0 00 20498 20062 436 21
उततिजखड Uttarakhand 2002 2002 0 00 2216 2216 0 00
उततरी कषतर Northern Region 47925 47356 569 12 63166 61726 1440 23
छततीसगढ़ Chhattisgarh 4444 4128 316 71 4444 4270 174 39
गरिजत Gujarat 16263 16263 0 00 17053 16963 90 05
मधय परिश Madhya Pradesh 12328 12323 5 00 13815 13815 0 00
महजिजषटर Maharashtra 22361 22291 70 03 23864 23254 610 26
िमन औि दिउ Daman amp Diu 336 336 0 01 357 356 1 02
िजिि व नगि हवली Dadra amp Nagar Haveli 800 799 1 01 816 815 1 01
गोवज Goa 538 538 0 00 596 596 0 00
पशचिमी कषतर Western Region 53132 52965 167 03 56675 55821 853 15
आनधर परिश Andhra Pradesh 8977 8977 0 00 9459 9453 6 01
तलगजनज Telangana 10471 10471 0 00 10815 10815 0 00
कनजाटक Karnataka 12841 12841 0 00 12841 12841 0 00
किल Kerala 4264 4228 36 09 4264 4228 36 09
तममल नजड Tamil Nadu 15712 15712 0 00 15712 15712 0 00
पडचिी Puducherry 427 412 15 34 427 412 15 34
लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0
दकषकषणी कषतर Southern Region 49464 49464 0 00 49464 49464 0 00
बबहजि Bihar 4633 4633 0 00 5115 5084 31 06
िजमोिि घजटी ननगम DVC 3035 3035 0 00 3035 3035 0 00
झजिखणड Jharkhand 1210 1210 0 00 1339 1291 48 36
ओडडशज Odisha 4827 4827 0 00 5357 5357 0 00
पशशचम बगजल West Bengal 8287 8287 0 00 9130 9123 7 01
मसशककम Sikkim 100 100 0 00 106 106 0 00
अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7
परवी कषतर Eastern Region 21658 21658 0 00 23141 22733 408 18
अरणजचल परिश Arunachal Pradesh 133 131 2 15 138 138 0 01
असम Assam 1539 1508 31 20 1865 1809 56 30
मणणपि Manipur 204 199 5 25 219 216 3 12
मघजलय Meghalaya 357 357 0 00 374 372 1 04
ममज़ोिम Mizoram 108 105 3 28 121 119 2 17
नजगजलड Nagaland 127 125 2 16 156 138 18 116
बिपिज Tripura 249 249 0 00 298 293 5 17
उततर-परवी कषतर North-Eastern Region 2540 2535 5 02 2967 2850 117 39
समपणण भारत All India 169464 168745 719 04 177022 175528 1494 08
Note The revised data for March 2019 is not avaliable 26
अधिकतम वरवदयत आपरत ण शथिरत ररपोरण (परवाणरवलोकन) Peak Power Supply Position Report (Provisional)
आकड़ मगज वजट नट Figures in MW net
राजयStateमािण2019 March2019 अपरल2018 -मािण2019 April2018 to March2019
मजग की पनत ा म कमी मजग की पनत ा म कमी Demand not MetDemand not Met
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
Excludes the supply to Bangladesh
अपरल 2019 April2019 अपरल2018 -मािण2019 April2019 to April2019
उततरी कषतर Northern Region
चडीगढ़ Chandigarh(Data Not Received)दिलली Delhi
हरियजणज Haryana
दहमजचल परिश Himachal Pradeshरमम कशमीि Jammu amp Kashmir(Data
Not Received)परजब Punjab
िजरसथजन Rajasthanउतति परिश Uttar Pradesh
उततिजखड Uttarakhand
पशचिमी कषतर Western Region
छततीसगढ़ Chhattisgarh
Apr-Nov 2018- No cuts
Maximum Demand cut-58MW
Energy cut- 00020-00032 MUsday
गरिजत Gujarat
मधय परिश Madhya Pradesh
महजिजषटर Maharashtra
गोवज Goa
दकषकषणी कषतर Southern Region
आनधर परिश Andhra Pradesh
तलगजनज Telangana
कनजाटक Karnataka
किल Kerala
तममल नजड Tamil Nadu
पडचिी Puducherryपरवी कषतर Eastern Region
बबहजि Bihar
झजिखणड Jharkhand
ओडडशज Odisha
पशशचम बगजल West Bengal
No N
otifie
d Cu
ts
27
मािण 2019 म इडथरीर पर वरवदयत करौती का वरवरवरण Notified Power CutsRestrictions on Industries during April2019
राजय कषतर State Regionऊराणमाग करौती EnergyDemand Cut
No N
otifie
d Cu
tsNo
Notifie
d Cu
ts
अपरल2019 April 2019 अपरल2019 -अपरल2019 April2019 to April2019
उततरी कषतर Northern Region
चडीगढ़ Chandigarh Data not received Data not received
दिलली Delhi Data not received Data not received
हरियजणज Haryana 0811 hrsday 0811 hrsday
दहमजचल परिश Himachal Pradesh HPSEBL has only 2 agriculture consumers and uninterrupted
power is being supplied to agriculture sector
HPSEBL has only 2 agriculture consumers and uninterrupted
power is being supplied to agriculture sector
रमम कशमीि Jammu amp Kashmir Data not received Data not received
परजब Punjab 379 hrsday 379 hrsday
िजरसथजन Rajasthan 0630 hrsday 0630 hrsday
उतति परिश Uttar Pradesh 2157 hrsday 2157 hrsday
उततिजखड Uttarakhand 2359 hrsday 2359 hrsday
पशचिमी कषतर Western Region
छततीसगढ़ Chhattisgarh 18 hrsday 18 hrsday
गरिजत Gujarat 8 hrsday 8 hrsday
मधय परिश Madhya Pradesh Three-Phase Supply(Irrigation)- 0953 hrs day Three-Phase
(Mixed) Supply - 2334 hrs day
Three-Phase Supply(Irrigation)- 0953 hrs day Three-Phase
(Mixed) Supply - 2334 hrs day
महजिजषटर Maharashtra Three-Phase Supply(Irrigation)- 9 hrs day Three-Phase Supply(Irrigation)- 9 hrs day
गोवज Goa No restriction No restriction
दकषकषणी कषतर Southern Region
आनधर परिश Andhra Pradesh 07 hrsday 07 hrsday
तलगजनज Telangana 24 hrsday 24 hrsday
कनजाटक Karnataka 6 hrsday 6 hrsday
किल Kerala No Restrictions No Restrictions
तममल नजड Tamil Nadu 9 hrsday (6 hrs during day time and 3 hrs during night time) 9 hrsday (6 hrs during day time and 3 hrs during night time)
पडचिी Puducherry No Restrictions No Restrictions
परवी कषतर Eastern Region
बबहजि Bihar 18 hrsday 18 hrsday
झजिखणड Jharkhand 20 hrsday 20 hrsday
ओडडशज Odisha 24 hrsday 24 hrsday
पशशचम बगजल West Bengal 23 hrsday 23 hrsday
28
मारच 2019 कषि कषतर को षिदयत आपरतच का षििरण Power Supply to Agricultural Sector during March2019
राजय कषतर State Regionऔसत वरवदयत आपरत ण घनरो म Average Hours of Supply
On segregated feeders
SNo Contents Page
1 Growth of Installed Capacity since 6th Plan 29
2 Progress of Transmission Sector since 6th Plan 30
3 All India Yearly Coal consumption for Power Generation (Utilities)
4 All India Annual Per Capita Consumption of Electricity since -2006
5 Average cost of power supply amp Average realisation (Paisakwh)
6 Growth of Rural Electrification amp Pump Sets Energisation
7 Status of Hydro Schemes Cleared by the CEA in Apr-2019
Section G - Growth of Power Sector
31
32
(In MW)
Coal Gas Diesel Total
End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472
End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634
End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537
End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596
End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921
End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703
End of 12th Plan 19216288 2532938 83763 21832988 6780 4447842 50018 31960630
Up to Apr-2019 20070450 2493722 63763 22627934 678000 4539922 7764163 35610019
Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-17) = 51529 MW
Electricity Generation (MU) Targets and Achievements for 2016-17
Coal Gas Diesel Nuclear Hydro Res Total
2007045 2493722 637629 678000 453992 77641625 22925174
29
1 Growth of Installed Capacity Since 6th Plan
Plan YearThermal
Nuclear Hydro RES (MNRE) Total
2007045
2493722637629
678000
4539922
77641625
Total Installed Capacity 35610019 MW
Coal Gas Diesel Nuclear Hydro Res
Progress of Transmission Sector in the Country up to April 2019
1 TRANSMISSION LINES (All fig in CKM)
At the end of
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
6th plan 0 0 0 0 0 0 0 0 0 0 0 0 1831 4198 0 6029 1641 44364 0 46005 3472 48562 0 52034
7th plan 0 0 0 0 0 0 0 0 0 0 0 0 13068 6756 0 19824 4560 55071 0 59631 17628 61827 0 79455
8th plan 0 0 0 0 1634 0 0 1634 0 0 0 0 23001 13141 0 36142 6564 73036 0 79600 31199 86177 0 117376
9th plan 0 0 0 0 3234 1504 0 4738 751 409 0 1160 29345 20033 0 49378 8687 88306 0 96993 42017 110252 0 152269
10th plan 0 0 0 0 4368 1504 0 5872 1775 409 0 2184 48708 24730 0 73438 9444 105185 0 114629 64295 131828 0 196123
11th Plan 0 0 0 0 5948 1504 1980 9432 4839 411 0 5250 71023 30191 5605 106819 10140 125010 830 135980 91950 157116 8415 257481
12th Plan 6124 0 0 6124 5948 1504 1980 9432 25465 1177 4598 31240 92482 48240 17065 157787 11014 151276 978 163268 141033 202197 24621 367851
13th Plan (Up
to Mar2019)6124 0 0 6124 5948 1504 1980 9432 33692 1512 6605 41809 101335 58238 21173 180746 11734 162552 1010 175296 158833 223806 30768 413407
13th Plan (Up
to Apr-19)6124 0 0 6124 5948 1504 1980 9432 33745 1512 6605 41862 101335 58258 21173 180766 11734 162953 1010 175697 158886 224227 30768 413881
27150 600 MW of 132 kV Inter-Regional power transmission capacity links which are operated radially from time to time is not added in the total
75050
47900
24000
99050
30
Grand Total
Note - The figure upto the end of 10th plan in for stringing progress including the lines not commissioned Now only commissioned lines are reckoned Accordingly the figure for 10th plan (end) may read
as 187555 after adjusting with (-) 10852 Ckm
Inter-regional Power Transfer Capacity (MW)
plusmn 800 kV HVDC plusmn 500 kV HVDC 765 kV 400 kV 220 kV
IR addition in 12th
Plan (up to March
2017)
Inter-regional
Transmission
Capacity at the end
of Plan Period 2017-
22 (as on April19)
IR at the end of 11th
PlanIR at the end of 12th
Plan
IR Capacity Addition
at the end of Plan
Period 2017-22 (Till
April 19)
2004-05 27800
2005-06 28100
2006-07 30200
2007-08 33000
2008-09 35500
2009-10 36700
2010-11 38700
2011-12 41756
2012-13 45460
2013-14 48940
2014-15 53040
2015-16 54590
2016-17 57430
2017-18 60800
2018-19 62890
Year
2005-06
2006-07
2007-08
2008-09
2009-10
2010-11
2011-12
2012-13
2013-14
2014-15
2015-16
2016-17
2017-18
2018-19
2004-05 254 209 7568
2005-06 260 221 7636
2006-07 276 227 7423
2007-08 293 239 7727
2008-09 340 263 8713
2009-10 355 268 8870
2010-11 398 303 11975
2011-12 455 330 13514
2012-13 501 376 14867
2013-14 518 175
2014-15 520
Source- PFC Reports on the performance of State Power Utilities 31
1181
7335
7786
91441
8188
88363
957
1010
1075
1122
1149
(GrossGen+ Net Import) Mid-year population Provisional
5 Average cost of power supply amp average realization ( paiseKWH )
Yearcost of supply
(paiseunit)
Realization(paiseunit)
Including AgricultureOnly
Agriculture
6719
7171
3 All India yearly Coal Consumption for Power Generation (Utilities)
YEARCoal Consumption
Million Tonnes
4 All India Annual per Capita consumption of Electricity Since 2006
Per Capita Consumption ( kWh)
6314
Sl
NoExecuting Agency
Installed
Capacity (MW)Cost (Rs crore)
Date of
Clearance
32
Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as
Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received
from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made
available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified
villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is
independent of the earlier published reports
No Hydro Electric Project has been issued concurrenceAppraisal letter by CEA during April 2019
7 Status of Hydro Schemes Cleared by the CEA in Apr-2019
Name of Scheme
1999-002000-01
297594
010408 to 310309010409 to 310310
10th Plan
2005-062006-07
322968331020
6 Growth Of Rural Electrification amp Pumpsets Energisation
Plan Year
9th Plan2002-03
134092626
4111
Pump Sets Energised Villages Electricfied (Nos)
2001-02
284064367244
1218
27801997-981998-99
3207
482864
12632
1576036
4451722594
15455554
2314176
397343611750
2093311060316074
65109527813884
46708
18423975
499150
2003-042004-05
5743
9769
Cumu upto End of 10th Plan
010407 to 310308
010410 to 310311557976840909
010411 to 310312
412667
86293726
No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification
since 2004-05
65291374575 296361511th Plan
Cumu upto End of 11th Plan
596556 21212860
557439Cummulative up to end of 12th Plan
SN Contents Page
1 Rate of sale of power for the year 2016-17 33-41
RATE OF SALE OF POWER FOR THE YEAR 2016-17
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) NORTHERN REGION
CENTRAL SECTOR
BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 18000 66900 19800
CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 54000 222400 21600
CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 30000 144400 19600
CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 23100 91700 42600
PARBATI - III HPS NHPC LTD HYDRO-HYDRO 52000 68200 54800
DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 28000 95600 30000
CHUTAK NHPC LTD HYDRO-HYDRO 4400 22000 79800
DULHASTI HPS NHPC LTD HYDRO-HYDRO 39000 228000 56400
SALAL HPS NHPC LTD HYDRO-HYDRO 69000 342300 11000
TANAKPUR HPS NHPC LTD HYDRO-HYDRO 9420 43000 29600
URI HPS -I NHPC LTD HYDRO-HYDRO 48000 280300 16000
URI HPS - II NHPC LTD HYDRO-HYDRO 24000 147300 48600
NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 4500 24600 88200
SEWA - II NHPC LTD HYDRO-HYDRO 12000 47100 43400
ANTA CCPP NTPC LTD THERMAL-GASN 41930 67539 32400
AURAIYA CCPP NTPC LTD THERMAL-GASN 66336 53501 39100
BADARPUR TPS NTPC LTD THERMAL-COAL 70500 159153 44800
DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 84000 296170 42300
DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 98000 526686 46300
DADRI CCPP NTPC LTD THERMAL-GASHSD 82978 227469 33000
FARIDABAD CCPP NTPC LTD THERMAL-GASN 43159 115577 30800
RIHAND STPS I NTPC LTD THERMAL-COAL 100000 596766 24500
RIHAND STPS II NTPC LTD THERMAL-COAL 100000 737069 24600
RIHAND STPS III NTPC LTD THERMAL-COAL 100000 706546 30600
SINGRAULI STPS NTPC LTD THERMAL-COAL 200000 1394068 20400
TANDA TPS NTPC LTD THERMAL-COAL 44000 295438 40800
UNCHAHAR TPS I NTPC LTD THERMAL-COAL 42000 256454 39800
UNCHAHAR TPS II NTPC LTD THERMAL-COAL 42000 273577 38900
UNCHAHAR TPS III NTPC LTD THERMAL-COAL 21000 142780 43000
KOLDAM NTPC LTD HYDRO-HYDRO 80000 363260 43600
NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 303575 25841
RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 108000 668677 35374
NJHPS SJVNL HYDRO-HYDRO 150000 699496 23820
RAMPUR HPS SJVNL HYDRO-HYDRO 41202 195982 32260
TEHRI HPP THDC HYDRO-HYDRO 100000 272543 51800
KOTESHWAR HEP THDC HYDRO-HYDRO 40000 106244 53400
IGSTPS JHAJJAR ARAVALI P CPL THERMAL-COAL 150000 510429 49490
NEYVELI BARSINGSAR NEYVELI LIG CORP LTD THERMAL-LIG 25000 127520 38040
STATE SECTOR
PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 21000 14222 48200
PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 21000 19205 48400
PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 25000 102257 42600
PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 25000 62107 41800
DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 60000 312213 41000
RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 120000 35767442200
WYC HYDEL STATION HPGCL HYDRO-HYDRO 6240 20365 24900
GIRI POWER HOUSE HPSEB HYDRO-HYDRO 6000 13958 7600
ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 1695 5467 11900
BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 12000 18528 6700
GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 2250 7462 22500
BASSI POWER HOUSE HPSEB HYDRO-HYDRO 6600 29649 7500
BINWA POWER HOUSE HPSEB HYDRO-HYDRO 600 2749 19300
ANNEXURE-I
RATE OF SALE OF POWER FOR THE YEAR 2016-2017
Page 33
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) GAJ POWER HOUSE HPSEB HYDRO-HYDRO 1050 2914 26700
BANER POWER HOUSE HPSEB HYDRO-HYDRO 1200 2864 16200
HOLI POWER HOUSE HPSEB HYDRO-HYDRO 300 616 22500
THIROT POWER HOUSE HPSEB HYDRO-HYDRO 450 1126 22500
KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 1200 3064 22500
LARJI POWER HOUSE HPSEB HYDRO-HYDRO 12600 53677 23700
NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 250 750 31000
CHABA POWER HOUSE HPSEB HYDRO-HYDRO 175 465 23300
RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 150 101 13400
SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 200 000 22500
KILLAR HPSEB HYDRO-HYDRO 030 050 22500
BHABA AUGUMENP H HPSEB HYDRO-HYDRO 450 1276 22500
BS CHAMBA HPSEB HYDRO-HYDRO 045 099 19500
GUMMA HPSEB HYDRO-HYDRO 300 423 22500
GAS TURBINE POWER STATION IPGCL THERMAL-GAS 27000 67233 39300
PPS-I PPCL THERMAL-GAS 33000 175905 38300
PPS-III PPCL THERMAL-GAS 137120 196879 36100
LOWER JHELUM JampKPDD HYDRO-HYDRO 10500 60214 5100
UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 2260 10514 6300
UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 10500 44202 8500
GANDHARBAL JampKPDD HYDRO-HYDRO 1500 8925 4700
KARNAH MPH JampKPDD HYDRO-HYDRO 200 1122 31000
CHENANI I JampKPDD HYDRO-HYDRO 2330 10892 6600
CHENANI II JampKPDD HYDRO-HYDRO 200 1188 9300
CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 750 3634 14200
IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 375 2108 18500
IGO MERCHELLONG JampKPDD HYDRO-HYDRO 300 1572 29700
PAHALGAM MHP JampKPDD HYDRO-HYDRO 450 1713 32900
MARPACHOO JampKPDD HYDRO-HYDRO 075 375 29800
HAFTAL JampKPDD HYDRO-HYDRO 100 483 28700
SANJAK JampKPDD HYDRO-HYDRO 126 441 36000
SEWA-III JampKPDD HYDRO-HYDRO 900 3273 20200
BHADERWAH JampKPDD HYDRO-HYDRO 150 935 8900
BAZGO JampKPDD HYDRO-HYDRO 030 108 33300
SUMOOR JampKPDD HYDRO-HYDRO 010 045 35400
HUNDER JampKPDD HYDRO-HYDRO 040 176 26200
STAKNA JampKPDD HYDRO-HYDRO 400 1933 4100
KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 124000 662879 31360
SURATGARH TPS RRVUNL THERMAL-COAL 150000 402328 41730
CHHABRA TPS 1amp 2 RRVUNL THERMAL-COAL 50000 305946 36700
CHHABRA TPS 3 RRVUNL THERMAL-COAL 25000 151536 36700
CHHABRA TPS 4 RRVUNL THERMAL-COAL 25000 155896 36700
RAMGARH GT POWER PROJECT RRVUNL THERMAL-COAL 22050 43177 41800
RAMGARH GAS T P PROJECT 3 RRVUNL THERMAL-GAS 5000 93615 41800
DHOLPUR C C POWER PROJECT RRVUNL THERMAL-R-LNG 33000 9486 46110
MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 14000 20855 34192
MINI MICRO HYDEL (MMH) P S RRVUNL HYDRO-HYDRO 2385 851 37800
KALISINDH TPP 1 RRVUNL THERMAL-COAL 60000 341543 45000
KALISINDH TPP 2 RRVUNL THERMAL-COAL 60000 211588 45000
KHARA HEP UPJVNL HYDRO-HYDRO 7200 26654 7200
MATATILLA HEP UPJVNL HYDRO-HYDRO 3060 12219 6500
OBRA HEP UPJVNL HYDRO-HYDRO 9900 21517 6300
RIHAND UPJVNL HYDRO-HYDRO 30000 57369 5500
ANPARA A TPS UPRVUNL THERMAL-COAL 63000 317536 27000
ANPARA B TPS UPRVUNL THERMAL-COAL 100000 705605 22700
ANPARA D UPRVUNL THERMAL-COAL 100000 300158 39800
HARDUAGANJ TPS UPRVUNL THERMAL-COAL 16500 45817 49200
HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 50000 304389 46600
OBRA A TPS UPRVUNL THERMAL-COAL 28800 13158 34000
OBRA B TPS UPRVUNL THERMAL-COAL 100000 328124 21900
Page 34
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) PANKI TPS UPRVUNL THERMAL-COAL 21000 66488 50300
PARICHHA TPS UPRVUNL THERMAL-COAL 22000 38762 49400
PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 42000 231931 45600
PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 50000 276722 50400
CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 24000 70845 8290
CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 14400 75366 8390
DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 3375 9595 12080
DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 5100 18701 10520
KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4140 17359 12330
KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 12000 33001 9420
KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 3000 11953 8320
TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 9000 33983 12460
MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 30400 124510 16110
RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 19800 17897 10550
MPUR UTTARAKHAND JVNL HYDRO-HYDRO 930 5121 19200
PATHRI UTTARAKHAND JVNL HYDRO-HYDRO 2040 11636 14200
GALOGI UTTARAKHAND JVNL HYDRO-HYDRO 300 648 12500
PRIVATE SECTOR
MGTPP CLP INDIA PVT LTD THERMAL-COAL 132000 268902 41940
SHRINAGAR HEP ALAKNANDA HPCL HYDRO-HYDRO 33000 127414 48800
GAMA INFRAPROP CCPP GAMA INFRAPROP PVT THERMAL-GAS 22500 52686 47000
PPGCL (BARA) JP POWER VENTURES LTD THERMAL-COAL 198000 448200 38500
MALANA HEP MALANA PCL HYDRO-HYDRO 8600 26354 29792
MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 10000 30369 32580
ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 19200 56347 36079
KASHANG HEP H P PCL HYDRO-HYDRO 19500 5034 29200
BASPA-II HEP HBPCL HYDRO-HYDRO 30000 132769 13600
KARCHAM WANGTOO HEP HBPCL HYDRO-HYDRO 100000 434386 36600
RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 108000 582600 43700
RITHALA COMBI CY POWER PLANT TATA POWER DDL THERMAL-GAS 9480 000 11900
RAJPURA TPS NABHA POWER LTD THERMAL-GAS 140000 901484 39000
TALWANDI SABO POWER LTD TALWANDI SABO POWER LTD THERMAL-COAL 198000 636040 49548
ROJA THERMAL POWER STATION ROJA POWER SCL THERMAL-COAL 120000 727200 43400
KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 34400 63400
BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 36000 62600
MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 38200 60800
UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 37900 61500
KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 42300 58800
LALITPUR PGCL BAJAJ ENERGY PVT LTD THERMAL-COAL 198000 359400 47300
PRAYAGRAJ PGCL PRAYAGRAJ PGCL THERMAL-COAL 132000 448200 38595
KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 132000 783182 33438
WESTERN REGION
CENTRAL SECTOR
INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 100000 325333 23892
OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 52000 141663 34001
GANDHAR CCPP NTPC LTD THERMAL-GAS 65739 221924 28700
KAWAS CCPP NTPC LTD THERMAL-GASN 65620 167929 27000
KORBA I amp II NTPC LTD THERMAL-COAL 210000 1499171 20500
KORBA III NTPC LTD THERMAL-COAL 50000 358746 26600
SIPAT STPS I NTPC LTD THERMAL-COAL 198000 1479902 26800
SIPAT STPS II NTPC LTD THERMAL-COAL 100000 766549 26500
VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 126000 693142 25800
VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 100000 608781 23800
VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 100000 673475 27600
VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 100000 655924 32900
VINDHYACHAL STPS V NTPC LTD THERMAL-COAL 50000 328265 31700
MOUDA I NTPC LTD THERMAL-COAL 100000 343130 44500
MOUDA Ii NTPC LTD THERMAL-COAL 66000 40637 39900
RATNAGIRI GAS amp POWER PVT LTD RGPPL THERMAL-GAS 196708 442485 47000
KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 000 24729
TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 32000 201227 10740
Page 35
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 365122 19069
TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 787444 29324
STATE SECTOR
GSEG-HAZIRA15610 MW GUJARAT S ENEGEN LTD THERMAL-GAS 15610 1805 28200
GSEG-HAZIRA35143 MW GUJARAT S ENEGEN LTD THERMAL-GAS 35130 22276 51300
GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 21978 51800
AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 13929 26100
KORBA TPS EAST CSPGCL THERMAL-COAL 44000 198673 33880
DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 365808 27570
KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 316500 30420
HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 532878 19410
CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 515 58300
MTTPS CHAMPA U-I CSPGCL THERMAL-COAL 50000 220376 39000
MTTPS CHAMPA U-II CSPGCL THERMAL-COAL 50000 23709 10000
SHP GANGREL CSPGCL HYDRO-HYDRO 1000 2350 36790
BANGO HEP CSPGCL HYDRO-HYDRO 12000 14662 8900
MHP KORBA WEST CSPGCL HYDRO-HYDRO 170 859 38190
SIKASAR HEP CSPGCL HYDRO-HYDRO 700 418 26870
DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8843 74500
DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 19446 51500
GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 66388 71600
GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127488 41300
KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 96072 43900
KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 29841 56400
SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 184966 58800
UKAI 1-5 GSECL THERMAL-COAL 85000 204891 46900
UKAI TPS 6 GSECL THERMAL-COAL 50000 284448 48200
WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 271999 58300
WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 82808 44100
KADANA HPS GSECL HYDRO-HYDRO 24200 34433 16800
UKAI HPS GSECL HYDRO-HYDRO 30500 40585 6100
TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 123000 11500
BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 8900 10900
BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 7200 27500
JHINNA HPS MPPGCL HYDRO-HYDRO 2000 9700 18500
RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 44300 3400
GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 17300 4600
SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 4100 16900
MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 14600 27000
PENCH HPS MPPGCL HYDRO-HYDRO 16000 23700 8100
RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 3000 16900
AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 134400 35100
SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 283800 38700
SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 344600 34300
SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 111600 61600
SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 211800 58000
SSTPS PH-I MPPGCL THERMAL-COAL 120000 233100 84300
BHUSAWAL TPS MSPGCL THERMAL-COAL 142000 566258 51100
CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1365682 33700
KHAPERKHEDA MSPGCL THERMAL-COAL 134000 706207 39100
KORADI TPS MSPGCL THERMAL-COAL 62000 443206 42000
NASIK TPS MSPGCL THERMAL-COAL 63000 297275 47000
PARLI TPS MSPGCL THERMAL-COAL 113000 175934 71600
PARAS MSPGCL THERMAL-COAL 50000 267931 38700
URAN CCPP MSPGCL THERMAL-GAS 67200 320330 30600
KOYANA MSPGCL HYDRO-HYDRO 195600 328155 13100
SMALL HYDRO POWER PLANTS MSPGCL HYDRO-HYDRO 45400 93062 30500
BHIRA MSPGCL HYDRO-HYDRO 8000 10046 8400
TILLARI MSPGCL HYDRO-HYDRO 8900 10584 3100
SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 233298 20500
SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 87633 20500
PRIVATE SECTOR
Page 36
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 81282 46750
JNSTPP(JAYPEE NIGRIE) JP POWER VENTURES LTD THERMAL-COAL 132000 726695 29310
MB POWER MB POWER THERMAL-COAL 120000 345632 38310
ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 754922 28671
ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 780761 23495
ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 198000 1263784 32090
ADANI POWER MAHARA ADANI POWER LTD THERMAL-COAL 330000 1666191 34124
AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 170065 36827
SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 252035 45129
ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 458551 36000
ESSAR POWER MP LTD ESSAR POWER MP LTD THERMAL-COAL 60000 243040 28600
VEDANTA LTD (P P -I) VEDANTA LTD THERMAL-GAS 3000 15044 24000
VEDANTA LTD (P P -II) VEDANTA LTD THERMAL-GAS 3000 21293 24000
PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 8234600 24000
165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 5850 64390
145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 68717 40349
SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 132655 28776
SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 144686 38567
MUNDRA UMPPCOASTAL GUJARAT POWER
LTD THERMAL-IMP COAL 400000 2530300
23900
LANCO AMARKANTAK TPP PATHADIH
U-ILANCO AMARKAN POWER LTD THERMAL-COAL 30000 195500
29200
LANCO AMARKANTAK TPP PATHADIH
U-IILANCO AMARKAN POWER LTD THERMAL-COAL 30000 206900
27600
BARADARHA TPS D B POWER LTD THERMAL-COAL 120000 677373 29200
JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 405000 28900
JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 453000 40500
DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 339437 40700
TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 293400 44000
TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 137200 37000
TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 174900 44000
BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 92900 14100
BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23700 34300
KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 27600 48300
CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2530300 23900
BHANDARDRA HEP -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 2475 54900
SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 161400 26500
SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 445000 39000
SOTHERN REGION
CENTRAL SECTOR
NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 325699 54820
NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 305532 39880
NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 998805 38510
NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 113016 54070
NEYVELI TAMILNADU POWER LTD JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 625274 42200
VALLUR TPS NTPC TECL THERMAL-COAL 150000 856438 42350
R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 1493 84300
RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1502919 29400
RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 341291 31800
SIMHADRI I NTPC LTD THERMAL-COAL 100000 688382 36800
SIMHADRI II NTPC LTD THERMAL-COAL 100000 663657 43400
KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 593110 31324
MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 291625 21764
KKNPP-1 amp 2 NPCIL NUCLEAR-NUCLEAR 200000 572609 40948
MINICOY LAKSHADEEP THERMAL-DIESEL 340 770 29600
KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1097 29600
AMINI LAKSHADEEP THERMAL-DIESEL 265 509 29600
ANDROTT LAKSHADEEP THERMAL-DIESEL 219 524 29600
KALPENI LAKSHADEEP THERMAL-DIESEL 175 356 29600
AGATTI LAKSHADEEP THERMAL-DIESEL 195 658 29600
KADMAT LAKSHADEEP THERMAL-DIESEL 190 414 29600
KILTAN LAKSHADEEP THERMAL-DIESEL 150 269 29600
CHETLET LAKSHADEEP THERMAL-DIESEL 100 139 29600
BITRA LAKSHADEEP THERMAL-DIESEL 043 024 29600
BANGARAM LAKSHADEEP THERMAL-DIESEL 018 009 29600
Page 37
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) STATE SECTOR
Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 721811 46500
Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 50000 336142 46500
RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 237358 46500
RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 239926 46500
RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 124500 46500
SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 62109 46500
UPPER SILERU APGENCO HYDRO-HYDRO 24000 33000 46500
LOWER SILERU APGENCO HYDRO-HYDRO 46000 81066 46500
DONKARAI APGENCO HYDRO-HYDRO 2500 6007 46500
PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 1262 46500
CHETTIPETA APGENCO HYDRO-HYDRO 100 214 46500
MUCHKUND APGENCO HYDRO-HYDRO 12000 37571 46500
NAGARJUNASAGAR RCPH APGENCO HYDRO-HYDRO 9000 606 46500
TUNGABHADRA HES amp HAMPI(AP
Share)
APGENCO HYDRO-HYDRO 7200 6100 46500
KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 352232 42600
KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 288131 32500
KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 319272 46500
RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 40073 44300
KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 308317 46000
KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 308963 51300
SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 61004 76600
NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 17960 75300
PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 20873 58300
POCHAMPAD-I TSPGENCO HYDRO-HYDRO 2700 5455 29800
POCHAMPAD-II TSPGENCO HYDRO-HYDRO 900 1932 40700
NIZAMSAGAR TSPGENCO HYDRO-HYDRO 1000 1126 53400
RAICHUR TPS 1 to 7 KPCL THERMAL-COAL 147000 890866 43800
RAICHUR TPS 8 KPCL THERMAL-COAL 25000 159523 48200
BELLARI TPS 1 KPCL THERMAL-COAL 50000 318679 51100
BELLARI TPS 2 KPCL THERMAL-COAL 50000 232347 55600
BELLARI TPS 3 KPCL THERMAL-COAL 70000 47565 34400
BHADRA PH KPCL HYDRO-HYDRO 3920 2369 45900
GERUSUPPA PH KPCL HYDRO-HYDRO 24000 26990 22000
GHAT PRABHA HEP KPCL HYDRO-HYDRO 3200 4777 25300
KADRA HPS KPCL HYDRO-HYDRO 15000 16889 26800
NAGJHARI KPCL HYDRO-HYDRO 90000 155159 9800
KODASALLI DPH KPCL HYDRO-HYDRO 12000 14854 19200
MUNIRA+MGH+SPH+SPH KPCL HYDRO-HYDRO 22640 48211 7900
SHARAVATHY HPS KPCL HYDRO-HYDRO 108550 276215 5400
ALMATTI DPH KPCL HYDRO-HYDRO 29000 39611 24600
VARAHI UGPH KPCL HYDRO-HYDRO 46000 71368 15600
IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 17196 15300
IDUKKI HPS KSEB HYDRO-HYDRO 78000 137905 15300
KAKKAD HPS KSEB HYDRO-HYDRO 5000 13063 15300
KALLADA HPS KSEB HYDRO-HYDRO 1500 4436 15300
KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 46544 15300
KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 635 15300
LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 30822 15300
MALANKARA HPS KSEB HYDRO-HYDRO 1050 2474 15300
MATTUPETTY KSEB HYDRO-HYDRO 200 230 15300
MALAMPUZHA KSEB HYDRO-HYDRO 250 063 15300
CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 864 15300
URUMI ST I amp II KSEB HYDRO-HYDRO 615 903 15300
LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 248 15300
NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7765 19625 15300
PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 16601 15300
PANNIAR HPS KSEB HYDRO-HYDRO 3240 6217 15300
PORINGALKUTHU KSEB HYDRO-HYDRO 3600 10052 15300
PORINGALKUTHU LBE KSEB HYDRO-HYDRO 1600 9438 15300
PEPPARA KSEB HYDRO-HYDRO 300 395 15300
POOZHITHODE KSEB HYDRO-HYDRO 480 1045 15300
Page 38
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) PEECHI KSEB HYDRO-HYDRO 125 040 15300
RANI-PERUNADU KSEB HYDRO-HYDRO 400 585 15300
SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 79783 15300
SENGULAM HPS KSEB HYDRO-HYDRO 5120 11558 15300
SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 16711 15300
VILANGAD KSEB HYDRO-HYDRO 750 1578 15300
BARAPOLE KSEB HYDRO-HYDRO 1500 1932 15300
VELLATHOOVAL KSEB HYDRO-HYDRO 360 305 15300
CHIM0NY KSEB HYDRO-HYDRO 250 156 15300
ADYANPARA KSEB HYDRO-HYDRO 350 501 15300
BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 554 15300
KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 3801 15300
KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 23132 32800
ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 14416 62280
METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 523970 62280
METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 321270 62280
NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 336575 62280
NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 591240 62280
TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 508966 62280
KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 30897 62280
VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 18720 90699 62280
KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 33593 62280
BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 1047 62280
PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 1250 62280
PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 330 62280
MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 4897 62280
MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 032 62280
KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15681 62280
KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 40608 62280
KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 21342 62280
KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 4717 62280
KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4322 62280
KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2399 62280
METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 4416 62280
METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 8035 62280
BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2187 62280
BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2359 62280
BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2511 62280
BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 1949 62280
BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 1819 62280
POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 172 62280
SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 241 62280
MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 026 62280
THIRUMOORTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 136 62280
PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 9309 62280
VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 353 62280
SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 4192 62280
PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 6571 62280
SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 1186 62280
SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6319 62280
ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 6122 62280
KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 28674 62280
SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 18381 62280
SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 4258 62280
KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 12680 62280
KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4201 62280
ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 000 62280
PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 19175 62280
AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 078 62280
BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 504 62280
BHAVANI KATTALAI (BKB)(IIIampIII BB I amp II)TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 5847 62280
PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 000 62280
Page 39
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) SRI DAMODARAM STPS APPDCL THERMAL-COAL 160000 808108 36300
PRIVATE SECTOR
KARUPPUR TANJORE LANCO TANJORE PCL THERMAL-GAS 12000 48096 28770
SIMHAPURI ENERGY LTD SIMHAPURI ENERGY LTD THERMAL-COAL 60000 143900 39100
JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 7111 45500
SBU 1 JSW ENERGY LTD
VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 26000 159100
43300
SBU 2 JSW ENERGY LTD
VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 60000 247900
42800
LANCO KPLLANCO KONDAPALLI POWER
LTDTHERMAL-GAS 36814 85060
25776
LANCO KPL STG -IILANCO KONDAPALLI POWER
LTDTHERMAL-GAS 36600 12979
46330
LANCO KPL STG -IIIALANCO KONDAPALLI POWER
LTDTHERMAL-GAS 37100 85710
46330
LANCO KPL STG -III BLANCO KONDAPALLI POWER
LTDTHERMAL-GAS 37100 43639
46330
HINDUJA NATIONAL PCL HINDUJA NATIONAL PCL THERMAL-COAL 104000 303000 38200
MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 121164 49940
UDUPI POWER COR LTD ADANI POWER LTD THERMAL-COAL 120000 754613 42500
SPECTRUM POWER GENERATION
LTD SPECTRUM PG LTD THERMAL-GASN 20525 9256812
34952
TAQA NEYVELI POWER COM PVT
LTD TAQA NEYVELI THERMAL-LIG 25000 5840
34500
ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 251000 51000
ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 207860 36800
GMR VEMAGIRI POWER GENERATION
LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 30117
46450
EASTERN REGION
CENTRAL SECTOR
MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 64675 53113
MTPS STAGE - II KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 39000 1432 69138
BOKARO `B` TPS DVC THERMAL-COAL 63000 145670 31539
MEJIA TPS U 1-3 DVC THERMAL-COAL 63000 348298 31552
MEJIA TPS U 4 DVC THERMAL-COAL 21000 116099 34997
MEJIA TPS U 5-6 DVC THERMAL-COAL 50000 276427 35976
MEJIA TPS U 7-8 DVC THERMAL-COAL 100000 552854 36991
DURGAPUR STEEL TPS DVC THERMAL-COAL 100000 665550 39323
DURGAPUR TPS DVC THERMAL-COAL 21000 59270 35416
RAGHUNATHPUR TPS DVC THERMAL-COAL 120000 201650 35326
MAITHON HYDEL STA DVC HYDRO-HYDRO 6320 12200 17984
CHANDRAPURA TPSU1-3 DVC THERMAL-COAL 42000 257610 35095
CHANDRAPURA TPSU7-8 DVC THERMAL-COAL 50000 306673 34987
KODERMA TPS DVC THERMAL-COAL 100000 380180 38131
PANCHET HPS DVC HYDRO-HYDRO 8000 13360 17984
TILLAYA HPS DVC HYDRO-HYDRO 400 1410 17984
RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34700 35400
TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 277300 23200
TLDP -III NHPC LTD HYDRO-HYDRO 13200 55400 62000
TLDP -IV NHPC LTD HYDRO-HYDRO 16000 60300 25600
FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 957219 33700
FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 308943 41000
BONGAINGAON TPS NTPC LTD THERMAL-COAL 25000 153663 58600
KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 542277 34200
KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 942591 34200
BARH-II NTPC LTD THERMAL-COAL 132000 728021 44500
TALCHER TPS NTPC LTD THERMAL-COAL 46000 335521 30100
TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 702319 25600
TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1436521 24700
STATE SECTOR
BTPS(RampM) BIHAR STATE PGCL THERMAL-COAL 22000 12142 39700
BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 98331 10602
HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 50593 9482
CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 19689 2605
RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 53192 6033
UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 147208 14637
Page 40
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 60353 4519
IB TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 288567 25000
J P H GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 210 038 61100
MEYONG CHU GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 400 1086 61100
TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 122667 38200
DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 214339 43321
KOLAGHAT THERMAL POWER
STATION
WEST BENGAL PDCL THERMAL-COAL 126000 538269 31603
BAKRESHWAR THERMAL POWER
PLANT
WEST BENGAL PDCL THERMAL-COAL 105000 634876 32154
BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 45000 166855 33299
SANTHALDIH THERMAL POWER
STATION
WEST BENGAL PDCL THERMAL-COAL 50000 336442 34932
SAGARDIGHI THERMAL POWER
PROJECT
WEST BENGAL PDCL THERMAL-COAL 160000 423121 34705
JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 20344 68900
RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 24559 68900
TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 4623 68900
PURULIA PUMPED STORAGE
PROJECT
WEST BENGAL SEDCL HYDRO-HYDRO 90000 108816 68900
MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2768 68900
PRIVATE SECTOR
CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 49474 20230
CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 555500 70200
HALDIA ENERGY HALDIA ENERGY LTD THERMAL-COAL 60000 371000 50400
DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3688 63400
KAMALANGA TPS GMR KAMALANGA ENERGY LTD THERMAL-COAL 105000547670
33300
ADHUNIK POWER U-1 ADHUNIK POWER THERMAL-COAL 27000 158 44060
ADHUNIK POWER U-2 ADHUNIK POWER THERMAL-COAL 27000 168 44250
VL-JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 332800 23622
JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 43000 45250
JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 71700 37030
JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 70700 35920
JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 71100 38870
JOJOBERA UNIT 5 TATA POWER COM LTD THERMAL-COAL 12000 79300 44560
JOJOBERA UNIT 6 TATA POWER COM LTD THERMAL-WHR 12000 83700 12840
IEL KALINGANAGAR U-I TATA POWER COM LTD THERMAL-WG 6750 33400 22500
IEL KALINGANAGAR U-II TATA POWER COM LTD THERMAL-WG 6750 34800 22500
MAITHON UNIT 1 amp 2 TATA POWER COM LTD THERMAL-COAL 105000 678000 36100
HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 27500 24340
HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 28400 24340
HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 15800 24310
NORTH EASTERN REGION
CENTRAL SECTOR
LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 74100 36600
AGARTALA GT NEEPCO THERMAL-GAS 13500 88611 27210
ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 153111 32310
DOYANG HEP NEEPCO HYDRO-HYDRO 7500 25598 49801
KOPILI HEP NEEPCO HYDRO-HYDRO 20000 98186 11491
KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 19582 20237
KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 10310 17968
RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 124093 22945
TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 10100 17344 39000
STATE SECTOR
HYDRO POWER (122 Stns) ITANAGAR GOVT OF ARUNACHAL
PRADESHHYDRO-HYDRO 6971 6217270
24600
KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39514 17337
LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 82327 36810
NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 33318 48290
MYNTRIANG SHEP ST II ASSAM POWER GENCO HYDRO-HYDRO 300 567 35776
LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 9130 49200
LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 012 49200
DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 022 49200
TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 000 49200
UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 4990 16000
UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 6476 37000
UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 16494 14600
UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 3600 9556 15000
SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 758 8000
MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44070 44800
KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 154 41400
TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 091 41400
MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 411 41400
MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 394 41400
KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 760 41400
SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 3264 41400
LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 044 41400
BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 18953 28000
ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 43585 28200
GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 4080 11100
Note
LIG Lignite N Naptha WHR Waste Heat Recovery
Page 41
Programme Achievement Ach Programme Achievement Ach
Central Sector 37545100 3177900 3129530 9848 3177900 3129530 9848
State Sector 37498600 3322500 2950558 8881 3322500 2950558 8881
PvtIPP Sector 37346200 3236400 3195940 9875 3236400 3195940 9875
PvtUTL Sector 1823100 159300 165579 10394 159300 165579 10394
Total 114213000 9896100 9441607 9541 9896100 9441607 9541
Central Sector 5661700 386100 481390 12468 386100 481390 12468
State Sector 6680500 498200 536514 10769 498200 536514 10769
PvtIPP Sector 1206900 57300 80405 14032 57300 80405 14032
PvtUTL Sector 144100 12300 10930 8886 12300 10930 8886
Total 13693200 953900 1109239 11628 953900 1109239 11628
Central Sector 4472000 367300 317765 8651 367300 317765 8651
Total 4472000 367300 317765 8651 367300 317765 8651
Bhutan Import 621800 17500 24396 13941 17500 24396 13941
Central Sector 47678800 3931300 3928685 9993 3931300 3928685 9993
State Sector 44179100 3820700 3487072 9127 3820700 3487072 9127
Pvt Sector 40520300 3465300 3452854 9964 3465300 3452854 9964
Total 133000000 11234800 10893007 9696 11234800 10893007 9696
Provisional based on actual-cum-Assesment
Figs in MU
Cummulative
Achievement
Cummulative
Achievement
Mar-19 Mar-18 Upto Mar-2019 Upto Mar-2018
984785 869291 12675910 10183949
22
1 Electricity Generation (MU) Targets and Achievememts for 2019-20
All India Energy Generation During Apr-19 to Apr-19 (MU)
Target (2019-20)Apr-19 to Apr-19
Sector
Hydro
Thermal
Nuclear
Renewable Energy Generation
Achievement
Apr-2019
98961
95393673
112348
94416
11092
3178
108930
0
20000
40000
60000
80000
100000
120000
Thermal Hydro Nuclear Total
Programme
Achievement
SN Contents Page
1 Energy Power Supply Position (Provisional) for Apr-2019 and during Apr-19 to Apr-19 23
2 Peak Power Supply Position (Provisional) for Apr-2019 and during Apr-19 to Apr-19 24
3 Energy Power Supply Position (Revised) for Mar-2019 and during Apr-19 to Mar-19 25
4 Peak Power Supply Position (Revised) for Mar-2019 and during Apr-19 to Mar-19 26
5 Notified Power cuts Restrictions on Industries during Apr-2019 27
6 Power Supply to Agricultural Sector during Apr-2019 28
Section F - Power supply position
आकड़ मममलयन यननट नट Figures in MU net
ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied
कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )
चडीगढ़ Chandigarh 117 117 0 00 117 117 0 00
दिलली Delhi 2698 2698 1 00 2698 2698 1 00
हरियजणज Haryana 3773 3773 0 00 3773 3773 0 00
दहमजचल परिश Himachal Pradesh 777 777 0 00 777 777 0 00
रमम कशमीि Jammu amp Kashmir 1604 1296 308 192 1604 1296 308 192
परजब Punjab 3646 3646 0 00 3646 3646 0 00
िजरसथजन Rajasthan 6210 6208 2 00 6210 6208 2 00
उतति परिश Uttar Pradesh 10179 10148 32 03 10179 10148 32 03
उततिजखड Uttarakhand 1120 1120 0 00 1120 1120 0 00
उततरी कषतर Northern Region 30094 29786 308 10 30094 29786 308 10
छततीसगढ़ Chhattisgarh 2684 2676 8 03 2684 2676 8 03
गरिजत Gujarat 10718 10718 0 00 10718 10718 0 00
मधय परिश Madhya Pradesh 6006 6006 0 00 6006 6006 0 00
महजिजषटर Maharashtra 14308 14308 0 00 14308 14308 0 00
िमन औि दिउ Daman amp Diu 220 220 0 00 220 220 0 00
िजिि व नगि हवली Dadra amp Nagar Haveli 552 552 0 00 552 552 0 00
गोवज Goa 388 388 0 00 388 388 0 00
पशचिमी कषतर Western Region 34875 34868 8 00 34875 34868 8 00
आनधर परिश Andhra Pradesh 5708 5708 0 00 5708 5708 0 00
तलगजनज Telangana 5725 5725 0 00 5725 5725 0 00
कनजाटक Karnataka 7003 7003 0 00 7003 7003 0 00
किल Kerala 2402 2400 2 01 2402 2400 2 01
तममल नजड Tamil Nadu 10010 10010 0 00 10010 10010 0 00
पडचिी Puducherry 263 263 0 00 263 263 0 00
लकष-दवीप Lakshadweep 4 4 0 0 4 4 0 0
दकषकषणी कषतर Southern Region 31111 31109 2 00 31111 31109 2 00
बबहजि Bihar 2589 2589 0 00 2589 2589 0 00
िजमोिि घजटी ननगम DVC 1772 1772 0 00 1772 1772 0 00
झजिखणड Jharkhand 689 689 0 00 689 689 0 00
ओडडशज Odisha 2689 2689 1 00 2689 2689 1 00
पशशचम बगजल West Bengal 5075 5075 0 00 5075 5075 0 00
मसशककम Sikkim 37 37 0 00 37 37 0 00
अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 7 29 27 2 7
परवी कषतर Eastern Region 12851 12850 1 00 12851 12850 1 00
अरणजचल परिश Arunachal Pradesh 66 66 0 05 66 66 0 05
असम Assam 766 709 57 75 766 709 57 75
मणणपि Manipur 68 67 1 15 68 67 1 15
मघजलय Meghalaya 170 160 10 59 170 160 10 59
ममज़ोिम Mizoram 54 53 0 08 54 53 0 08
नजगजलड Nagaland 54 54 0 08 54 54 0 08
बिपिज Tripura 122 120 1 12 122 120 1 12
उततर-परवी कषतर North-Eastern Region 1300 1228 71 55 1300 1228 71 55
समपणण भारत All India 110231 109842 389 04 110231 109842 389 04
23
ऊरजा पनत ा म कमी ऊरजा पनत ा म कमीEnergy not Supplied
Excludes energy exported to Bangladesh
Energy not Supplied
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
ऊराण वरवदयत आपरत ण शथिरत ररपोरण (परवाणरवलोकन) Energy Power Supply Position Report (Provisional)
राजयState
अपरल 2019 April2019 अपरल2019 -अपरल2019 April2019 to April2019
अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met
कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )
चडीगढ़ Chandigarh 256 256 0 00 256 256 0 00
दिलली Delhi 5664 5664 0 00 5664 5664 0 00
हरियजणज Haryana 8127 8127 0 00 8127 8127 0 00
दहमजचल परिश Himachal Pradesh 1387 1387 0 00 1387 1387 0 00
रमम कशमीि Jammu amp Kashmir 2826 2261 565 200 2826 2261 565 200
परजब Punjab 7015 7015 0 00 7015 7015 0 00
िजरसथजन Rajasthan 10560 10560 0 00 10560 10560 0 00
उतति परिश Uttar Pradesh 19935 19935 0 00 19935 19935 0 00
उततिजखड Uttarakhand 1922 1922 0 00 1922 1922 0 00
उततरी कषतर Northern Region 54476 53985 491 09 54476 53985 491 09
छततीसगढ़ Chhattisgarh 4596 4574 22 05 4596 4574 22 05
गरिजत Gujarat 17871 17865 6 00 17871 17865 6 00
मधय परिश Madhya Pradesh 10018 10018 0 00 10018 10018 0 00
महजिजषटर Maharashtra 23158 23150 8 00 23158 23150 8 00
िमन औि दिउ Daman amp Diu 341 340 1 02 341 340 1 02
िजिि व नगि हवली Dadra amp Nagar Haveli 818 818 0 00 818 818 0 00
गोवज Goa 594 594 0 00 594 594 0 00
पशचिमी कषतर Western Region 56242 56222 20 00 56242 56222 20 00
आनधर परिश Andhra Pradesh 9151 9151 0 00 9151 9151 0 00
तलगजनज Telangana 10191 10191 0 00 10191 10191 0 00
कनजाटक Karnataka 12681 12681 0 00 12681 12681 0 00
किल Kerala 4309 4300 8 02 4309 4300 8 02
तममल नजड Tamil Nadu 15972 15972 0 00 15972 15972 0 00
पडचिी Puducherry 482 480 2 05 482 480 2 05
लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0
दकषकषणी कषतर Southern Region 49155 49103 52 01 49155 49103 52 01
बबहजि Bihar 5357 5357 0 00 5357 5357 0 00
िजमोिि घजटी ननगम DVC 3039 3039 0 00 3039 3039 0 00
झजिखणड Jharkhand 1266 1266 0 00 1266 1266 0 00
ओडडशज Odisha 5389 5389 0 00 5389 5389 0 00
पशशचम बगजल West Bengal 8666 8666 0 00 8666 8666 0 00
मसशककम Sikkim 100 100 0 00 100 100 0 00
अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7
परवी कषतर Eastern Region 23349 23349 0 00 23349 23349 0 00
अरणजचल परिश Arunachal Pradesh 139 136 3 22 139 136 3 22
असम Assam 1712 1667 45 26 1712 1667 45 26
मणणपि Manipur 197 188 9 46 197 188 9 46
मघजलय Meghalaya 336 336 0 00 336 336 0 00
ममज़ोिम Mizoram 116 113 3 26 116 113 3 26
नजगजलड Nagaland 157 131 26 166 157 131 26 166
बिपिज Tripura 292 291 1 03 292 291 1 03
उततर-परवी कषतर North-Eastern Region 2848 2780 68 24 2848 2780 68 24
समपणण भारत All India 177411 176810 601 03 177411 176810 601 03
24
मजग की पनत ा म कमी Demand not Met
Excludes the supply to Bangladesh
राजयStateअपरल 2019 April2019
मजग की पनत ा म कमी Demand not Met
अधिकतम वरवदयत आपरत ण शथिरत ररपोरण (परवाणरवलोकन) Peak Power Supply Position Report (Provisional)
आकड़ मगज वजट नट Figures in MW netअपरल2019 -अपरल2019 April2019 to April2019
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
आकड़ मममलयन यननट नट Figures in MU net
ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied
कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )
चडीगढ़ Chandigarh 96 96 0 00 1561 1561 0 00
दिलली Delhi 1931 1930 1 00 32299 32282 17 01
हरियजणज Haryana 3658 3658 0 00 53665 53665 0 00
दहमजचल परिश Himachal Pradesh 832 830 2 02 9850 9618 232 24
रमम कशमीि Jammu amp Kashmir 1767 1414 353 200 19593 15868 3725 190
परजब Punjab 3585 3585 0 00 55288 55275 13 00
िजरसथजन Rajasthan 6774 6770 4 01 79826 79637 189 02
उतति परिश Uttar Pradesh 8754 8691 63 07 117101 116118 984 08
उततिजखड Uttarakhand 1067 1067 0 00 13845 13753 92 07
उततरी कषतर Northern Region 28464 28041 423 15 383028 377776 5251 14
छततीसगढ़ Chhattisgarh 2464 2457 8 03 26130 26076 54 02
गरिजत Gujarat 9890 9890 0 00 116588 116572 15 00
मधय परिश Madhya Pradesh 6236 6236 0 00 75667 75665 2 00
महजिजषटर Maharashtra 13631 13631 0 00 158285 158148 137 01
िमन औि दिउ Daman amp Diu 221 221 0 00 2557 2557 0 00
िजिि व नगि हवली Dadra amp Nagar Haveli 553 553 0 00 6317 6317 0 00
गोवज Goa 362 362 0 00 4283 4280 3 01
पशचिमी कषतर Western Region 33357 33349 8 00 389827 389615 212 01
आनधर परिश Andhra Pradesh 6072 6071 1 00 63735 63677 58 01
तलगजनज Telangana 6930 6929 1 00 66697 66635 62 01
कनजाटक Karnataka 7614 7612 1 00 71759 71690 69 01
किल Kerala 2489 2488 1 00 25029 24911 118 05
तममल नजड Tamil Nadu 10247 10245 2 00 109375 109273 102 01
पडचिी Puducherry 252 251 1 04 2761 2751 10 03
लकष-दवीप Lakshadweep 4 4 0 0 46 46 0 0
दकषकषणी कषतर Southern Region 33605 33597 8 00 339355 338938 417 01
बबहजि Bihar 2319 2318 1 00 30052 29827 225 07
िजमोिि घजटी ननगम DVC 1773 1772 1 00 22365 21995 369 17
झजिखणड Jharkhand 698 697 1 01 8682 8461 221 25
ओडडशज Odisha 2583 2582 1 00 31810 31781 30 01
पशशचम बगजल West Bengal 4585 4584 2 00 52237 52078 159 03
मसशककम Sikkim 41 41 0 00 513 512 0 01
अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 67 346 323 23 67
परवी कषतर Eastern Region 11999 11995 5 00 145658 144654 1004 07
अरणजचल परिश Arunachal Pradesh 61 60 0 06 864 855 9 10
असम Assam 680 656 23 34 9532 9204 328 34
मणणपि Manipur 68 68 1 09 916 906 10 11
मघजलय Meghalaya 173 173 0 03 1955 1953 1 01
ममज़ोिम Mizoram 50 49 0 09 668 661 8 12
नजगजलड Nagaland 58 57 1 20 902 809 93 103
बिपिज Tripura 150 150 0 00 1859 1837 21 11
उततर-परवी कषतर North-Eastern Region 1240 1214 26 21 16696 16225 471 28
समपणण भारत All India 108665 108196 469 04 1274564 1267209 7355 06
Note The revised data for March 2019 is not avaliable
Excludes energy exported to Bangladesh
राजयState
ऊराण वरवदयत आपरत ण शथिरत ररपोरण (परवाणरवलोकन) Energy Power Supply Position Report (Provisional)
25
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
Energy not Supplied Energy not Supplied
मािण2019 March2019 अपरल2018 -मािण2019 April2018 to March2019
ऊरजा पनत ा म कमी ऊरजा पनत ा म कमी
अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met
कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )
चडीगढ़ Chandigarh 223 223 0 00 369 369 0 00
दिलली Delhi 4016 4016 0 00 7016 7016 0 00
हरियजणज Haryana 6544 6544 0 00 10270 10270 0 00
दहमजचल परिश Himachal Pradesh 1683 1683 0 00 1700 1700 0 00
रमम कशमीि Jammu amp Kashmir 3277 2622 655 200 3277 2622 655 200
परजब Punjab 6564 6564 0 00 12638 12638 0 00
िजरसथजन Rajasthan 11885 11885 0 00 13276 13276 0 00
उतति परिश Uttar Pradesh 16220 16220 0 00 20498 20062 436 21
उततिजखड Uttarakhand 2002 2002 0 00 2216 2216 0 00
उततरी कषतर Northern Region 47925 47356 569 12 63166 61726 1440 23
छततीसगढ़ Chhattisgarh 4444 4128 316 71 4444 4270 174 39
गरिजत Gujarat 16263 16263 0 00 17053 16963 90 05
मधय परिश Madhya Pradesh 12328 12323 5 00 13815 13815 0 00
महजिजषटर Maharashtra 22361 22291 70 03 23864 23254 610 26
िमन औि दिउ Daman amp Diu 336 336 0 01 357 356 1 02
िजिि व नगि हवली Dadra amp Nagar Haveli 800 799 1 01 816 815 1 01
गोवज Goa 538 538 0 00 596 596 0 00
पशचिमी कषतर Western Region 53132 52965 167 03 56675 55821 853 15
आनधर परिश Andhra Pradesh 8977 8977 0 00 9459 9453 6 01
तलगजनज Telangana 10471 10471 0 00 10815 10815 0 00
कनजाटक Karnataka 12841 12841 0 00 12841 12841 0 00
किल Kerala 4264 4228 36 09 4264 4228 36 09
तममल नजड Tamil Nadu 15712 15712 0 00 15712 15712 0 00
पडचिी Puducherry 427 412 15 34 427 412 15 34
लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0
दकषकषणी कषतर Southern Region 49464 49464 0 00 49464 49464 0 00
बबहजि Bihar 4633 4633 0 00 5115 5084 31 06
िजमोिि घजटी ननगम DVC 3035 3035 0 00 3035 3035 0 00
झजिखणड Jharkhand 1210 1210 0 00 1339 1291 48 36
ओडडशज Odisha 4827 4827 0 00 5357 5357 0 00
पशशचम बगजल West Bengal 8287 8287 0 00 9130 9123 7 01
मसशककम Sikkim 100 100 0 00 106 106 0 00
अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7
परवी कषतर Eastern Region 21658 21658 0 00 23141 22733 408 18
अरणजचल परिश Arunachal Pradesh 133 131 2 15 138 138 0 01
असम Assam 1539 1508 31 20 1865 1809 56 30
मणणपि Manipur 204 199 5 25 219 216 3 12
मघजलय Meghalaya 357 357 0 00 374 372 1 04
ममज़ोिम Mizoram 108 105 3 28 121 119 2 17
नजगजलड Nagaland 127 125 2 16 156 138 18 116
बिपिज Tripura 249 249 0 00 298 293 5 17
उततर-परवी कषतर North-Eastern Region 2540 2535 5 02 2967 2850 117 39
समपणण भारत All India 169464 168745 719 04 177022 175528 1494 08
Note The revised data for March 2019 is not avaliable 26
अधिकतम वरवदयत आपरत ण शथिरत ररपोरण (परवाणरवलोकन) Peak Power Supply Position Report (Provisional)
आकड़ मगज वजट नट Figures in MW net
राजयStateमािण2019 March2019 अपरल2018 -मािण2019 April2018 to March2019
मजग की पनत ा म कमी मजग की पनत ा म कमी Demand not MetDemand not Met
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
Excludes the supply to Bangladesh
अपरल 2019 April2019 अपरल2018 -मािण2019 April2019 to April2019
उततरी कषतर Northern Region
चडीगढ़ Chandigarh(Data Not Received)दिलली Delhi
हरियजणज Haryana
दहमजचल परिश Himachal Pradeshरमम कशमीि Jammu amp Kashmir(Data
Not Received)परजब Punjab
िजरसथजन Rajasthanउतति परिश Uttar Pradesh
उततिजखड Uttarakhand
पशचिमी कषतर Western Region
छततीसगढ़ Chhattisgarh
Apr-Nov 2018- No cuts
Maximum Demand cut-58MW
Energy cut- 00020-00032 MUsday
गरिजत Gujarat
मधय परिश Madhya Pradesh
महजिजषटर Maharashtra
गोवज Goa
दकषकषणी कषतर Southern Region
आनधर परिश Andhra Pradesh
तलगजनज Telangana
कनजाटक Karnataka
किल Kerala
तममल नजड Tamil Nadu
पडचिी Puducherryपरवी कषतर Eastern Region
बबहजि Bihar
झजिखणड Jharkhand
ओडडशज Odisha
पशशचम बगजल West Bengal
No N
otifie
d Cu
ts
27
मािण 2019 म इडथरीर पर वरवदयत करौती का वरवरवरण Notified Power CutsRestrictions on Industries during April2019
राजय कषतर State Regionऊराणमाग करौती EnergyDemand Cut
No N
otifie
d Cu
tsNo
Notifie
d Cu
ts
अपरल2019 April 2019 अपरल2019 -अपरल2019 April2019 to April2019
उततरी कषतर Northern Region
चडीगढ़ Chandigarh Data not received Data not received
दिलली Delhi Data not received Data not received
हरियजणज Haryana 0811 hrsday 0811 hrsday
दहमजचल परिश Himachal Pradesh HPSEBL has only 2 agriculture consumers and uninterrupted
power is being supplied to agriculture sector
HPSEBL has only 2 agriculture consumers and uninterrupted
power is being supplied to agriculture sector
रमम कशमीि Jammu amp Kashmir Data not received Data not received
परजब Punjab 379 hrsday 379 hrsday
िजरसथजन Rajasthan 0630 hrsday 0630 hrsday
उतति परिश Uttar Pradesh 2157 hrsday 2157 hrsday
उततिजखड Uttarakhand 2359 hrsday 2359 hrsday
पशचिमी कषतर Western Region
छततीसगढ़ Chhattisgarh 18 hrsday 18 hrsday
गरिजत Gujarat 8 hrsday 8 hrsday
मधय परिश Madhya Pradesh Three-Phase Supply(Irrigation)- 0953 hrs day Three-Phase
(Mixed) Supply - 2334 hrs day
Three-Phase Supply(Irrigation)- 0953 hrs day Three-Phase
(Mixed) Supply - 2334 hrs day
महजिजषटर Maharashtra Three-Phase Supply(Irrigation)- 9 hrs day Three-Phase Supply(Irrigation)- 9 hrs day
गोवज Goa No restriction No restriction
दकषकषणी कषतर Southern Region
आनधर परिश Andhra Pradesh 07 hrsday 07 hrsday
तलगजनज Telangana 24 hrsday 24 hrsday
कनजाटक Karnataka 6 hrsday 6 hrsday
किल Kerala No Restrictions No Restrictions
तममल नजड Tamil Nadu 9 hrsday (6 hrs during day time and 3 hrs during night time) 9 hrsday (6 hrs during day time and 3 hrs during night time)
पडचिी Puducherry No Restrictions No Restrictions
परवी कषतर Eastern Region
बबहजि Bihar 18 hrsday 18 hrsday
झजिखणड Jharkhand 20 hrsday 20 hrsday
ओडडशज Odisha 24 hrsday 24 hrsday
पशशचम बगजल West Bengal 23 hrsday 23 hrsday
28
मारच 2019 कषि कषतर को षिदयत आपरतच का षििरण Power Supply to Agricultural Sector during March2019
राजय कषतर State Regionऔसत वरवदयत आपरत ण घनरो म Average Hours of Supply
On segregated feeders
SNo Contents Page
1 Growth of Installed Capacity since 6th Plan 29
2 Progress of Transmission Sector since 6th Plan 30
3 All India Yearly Coal consumption for Power Generation (Utilities)
4 All India Annual Per Capita Consumption of Electricity since -2006
5 Average cost of power supply amp Average realisation (Paisakwh)
6 Growth of Rural Electrification amp Pump Sets Energisation
7 Status of Hydro Schemes Cleared by the CEA in Apr-2019
Section G - Growth of Power Sector
31
32
(In MW)
Coal Gas Diesel Total
End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472
End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634
End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537
End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596
End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921
End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703
End of 12th Plan 19216288 2532938 83763 21832988 6780 4447842 50018 31960630
Up to Apr-2019 20070450 2493722 63763 22627934 678000 4539922 7764163 35610019
Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-17) = 51529 MW
Electricity Generation (MU) Targets and Achievements for 2016-17
Coal Gas Diesel Nuclear Hydro Res Total
2007045 2493722 637629 678000 453992 77641625 22925174
29
1 Growth of Installed Capacity Since 6th Plan
Plan YearThermal
Nuclear Hydro RES (MNRE) Total
2007045
2493722637629
678000
4539922
77641625
Total Installed Capacity 35610019 MW
Coal Gas Diesel Nuclear Hydro Res
Progress of Transmission Sector in the Country up to April 2019
1 TRANSMISSION LINES (All fig in CKM)
At the end of
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
6th plan 0 0 0 0 0 0 0 0 0 0 0 0 1831 4198 0 6029 1641 44364 0 46005 3472 48562 0 52034
7th plan 0 0 0 0 0 0 0 0 0 0 0 0 13068 6756 0 19824 4560 55071 0 59631 17628 61827 0 79455
8th plan 0 0 0 0 1634 0 0 1634 0 0 0 0 23001 13141 0 36142 6564 73036 0 79600 31199 86177 0 117376
9th plan 0 0 0 0 3234 1504 0 4738 751 409 0 1160 29345 20033 0 49378 8687 88306 0 96993 42017 110252 0 152269
10th plan 0 0 0 0 4368 1504 0 5872 1775 409 0 2184 48708 24730 0 73438 9444 105185 0 114629 64295 131828 0 196123
11th Plan 0 0 0 0 5948 1504 1980 9432 4839 411 0 5250 71023 30191 5605 106819 10140 125010 830 135980 91950 157116 8415 257481
12th Plan 6124 0 0 6124 5948 1504 1980 9432 25465 1177 4598 31240 92482 48240 17065 157787 11014 151276 978 163268 141033 202197 24621 367851
13th Plan (Up
to Mar2019)6124 0 0 6124 5948 1504 1980 9432 33692 1512 6605 41809 101335 58238 21173 180746 11734 162552 1010 175296 158833 223806 30768 413407
13th Plan (Up
to Apr-19)6124 0 0 6124 5948 1504 1980 9432 33745 1512 6605 41862 101335 58258 21173 180766 11734 162953 1010 175697 158886 224227 30768 413881
27150 600 MW of 132 kV Inter-Regional power transmission capacity links which are operated radially from time to time is not added in the total
75050
47900
24000
99050
30
Grand Total
Note - The figure upto the end of 10th plan in for stringing progress including the lines not commissioned Now only commissioned lines are reckoned Accordingly the figure for 10th plan (end) may read
as 187555 after adjusting with (-) 10852 Ckm
Inter-regional Power Transfer Capacity (MW)
plusmn 800 kV HVDC plusmn 500 kV HVDC 765 kV 400 kV 220 kV
IR addition in 12th
Plan (up to March
2017)
Inter-regional
Transmission
Capacity at the end
of Plan Period 2017-
22 (as on April19)
IR at the end of 11th
PlanIR at the end of 12th
Plan
IR Capacity Addition
at the end of Plan
Period 2017-22 (Till
April 19)
2004-05 27800
2005-06 28100
2006-07 30200
2007-08 33000
2008-09 35500
2009-10 36700
2010-11 38700
2011-12 41756
2012-13 45460
2013-14 48940
2014-15 53040
2015-16 54590
2016-17 57430
2017-18 60800
2018-19 62890
Year
2005-06
2006-07
2007-08
2008-09
2009-10
2010-11
2011-12
2012-13
2013-14
2014-15
2015-16
2016-17
2017-18
2018-19
2004-05 254 209 7568
2005-06 260 221 7636
2006-07 276 227 7423
2007-08 293 239 7727
2008-09 340 263 8713
2009-10 355 268 8870
2010-11 398 303 11975
2011-12 455 330 13514
2012-13 501 376 14867
2013-14 518 175
2014-15 520
Source- PFC Reports on the performance of State Power Utilities 31
1181
7335
7786
91441
8188
88363
957
1010
1075
1122
1149
(GrossGen+ Net Import) Mid-year population Provisional
5 Average cost of power supply amp average realization ( paiseKWH )
Yearcost of supply
(paiseunit)
Realization(paiseunit)
Including AgricultureOnly
Agriculture
6719
7171
3 All India yearly Coal Consumption for Power Generation (Utilities)
YEARCoal Consumption
Million Tonnes
4 All India Annual per Capita consumption of Electricity Since 2006
Per Capita Consumption ( kWh)
6314
Sl
NoExecuting Agency
Installed
Capacity (MW)Cost (Rs crore)
Date of
Clearance
32
Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as
Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received
from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made
available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified
villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is
independent of the earlier published reports
No Hydro Electric Project has been issued concurrenceAppraisal letter by CEA during April 2019
7 Status of Hydro Schemes Cleared by the CEA in Apr-2019
Name of Scheme
1999-002000-01
297594
010408 to 310309010409 to 310310
10th Plan
2005-062006-07
322968331020
6 Growth Of Rural Electrification amp Pumpsets Energisation
Plan Year
9th Plan2002-03
134092626
4111
Pump Sets Energised Villages Electricfied (Nos)
2001-02
284064367244
1218
27801997-981998-99
3207
482864
12632
1576036
4451722594
15455554
2314176
397343611750
2093311060316074
65109527813884
46708
18423975
499150
2003-042004-05
5743
9769
Cumu upto End of 10th Plan
010407 to 310308
010410 to 310311557976840909
010411 to 310312
412667
86293726
No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification
since 2004-05
65291374575 296361511th Plan
Cumu upto End of 11th Plan
596556 21212860
557439Cummulative up to end of 12th Plan
SN Contents Page
1 Rate of sale of power for the year 2016-17 33-41
RATE OF SALE OF POWER FOR THE YEAR 2016-17
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) NORTHERN REGION
CENTRAL SECTOR
BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 18000 66900 19800
CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 54000 222400 21600
CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 30000 144400 19600
CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 23100 91700 42600
PARBATI - III HPS NHPC LTD HYDRO-HYDRO 52000 68200 54800
DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 28000 95600 30000
CHUTAK NHPC LTD HYDRO-HYDRO 4400 22000 79800
DULHASTI HPS NHPC LTD HYDRO-HYDRO 39000 228000 56400
SALAL HPS NHPC LTD HYDRO-HYDRO 69000 342300 11000
TANAKPUR HPS NHPC LTD HYDRO-HYDRO 9420 43000 29600
URI HPS -I NHPC LTD HYDRO-HYDRO 48000 280300 16000
URI HPS - II NHPC LTD HYDRO-HYDRO 24000 147300 48600
NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 4500 24600 88200
SEWA - II NHPC LTD HYDRO-HYDRO 12000 47100 43400
ANTA CCPP NTPC LTD THERMAL-GASN 41930 67539 32400
AURAIYA CCPP NTPC LTD THERMAL-GASN 66336 53501 39100
BADARPUR TPS NTPC LTD THERMAL-COAL 70500 159153 44800
DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 84000 296170 42300
DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 98000 526686 46300
DADRI CCPP NTPC LTD THERMAL-GASHSD 82978 227469 33000
FARIDABAD CCPP NTPC LTD THERMAL-GASN 43159 115577 30800
RIHAND STPS I NTPC LTD THERMAL-COAL 100000 596766 24500
RIHAND STPS II NTPC LTD THERMAL-COAL 100000 737069 24600
RIHAND STPS III NTPC LTD THERMAL-COAL 100000 706546 30600
SINGRAULI STPS NTPC LTD THERMAL-COAL 200000 1394068 20400
TANDA TPS NTPC LTD THERMAL-COAL 44000 295438 40800
UNCHAHAR TPS I NTPC LTD THERMAL-COAL 42000 256454 39800
UNCHAHAR TPS II NTPC LTD THERMAL-COAL 42000 273577 38900
UNCHAHAR TPS III NTPC LTD THERMAL-COAL 21000 142780 43000
KOLDAM NTPC LTD HYDRO-HYDRO 80000 363260 43600
NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 303575 25841
RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 108000 668677 35374
NJHPS SJVNL HYDRO-HYDRO 150000 699496 23820
RAMPUR HPS SJVNL HYDRO-HYDRO 41202 195982 32260
TEHRI HPP THDC HYDRO-HYDRO 100000 272543 51800
KOTESHWAR HEP THDC HYDRO-HYDRO 40000 106244 53400
IGSTPS JHAJJAR ARAVALI P CPL THERMAL-COAL 150000 510429 49490
NEYVELI BARSINGSAR NEYVELI LIG CORP LTD THERMAL-LIG 25000 127520 38040
STATE SECTOR
PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 21000 14222 48200
PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 21000 19205 48400
PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 25000 102257 42600
PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 25000 62107 41800
DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 60000 312213 41000
RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 120000 35767442200
WYC HYDEL STATION HPGCL HYDRO-HYDRO 6240 20365 24900
GIRI POWER HOUSE HPSEB HYDRO-HYDRO 6000 13958 7600
ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 1695 5467 11900
BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 12000 18528 6700
GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 2250 7462 22500
BASSI POWER HOUSE HPSEB HYDRO-HYDRO 6600 29649 7500
BINWA POWER HOUSE HPSEB HYDRO-HYDRO 600 2749 19300
ANNEXURE-I
RATE OF SALE OF POWER FOR THE YEAR 2016-2017
Page 33
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) GAJ POWER HOUSE HPSEB HYDRO-HYDRO 1050 2914 26700
BANER POWER HOUSE HPSEB HYDRO-HYDRO 1200 2864 16200
HOLI POWER HOUSE HPSEB HYDRO-HYDRO 300 616 22500
THIROT POWER HOUSE HPSEB HYDRO-HYDRO 450 1126 22500
KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 1200 3064 22500
LARJI POWER HOUSE HPSEB HYDRO-HYDRO 12600 53677 23700
NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 250 750 31000
CHABA POWER HOUSE HPSEB HYDRO-HYDRO 175 465 23300
RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 150 101 13400
SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 200 000 22500
KILLAR HPSEB HYDRO-HYDRO 030 050 22500
BHABA AUGUMENP H HPSEB HYDRO-HYDRO 450 1276 22500
BS CHAMBA HPSEB HYDRO-HYDRO 045 099 19500
GUMMA HPSEB HYDRO-HYDRO 300 423 22500
GAS TURBINE POWER STATION IPGCL THERMAL-GAS 27000 67233 39300
PPS-I PPCL THERMAL-GAS 33000 175905 38300
PPS-III PPCL THERMAL-GAS 137120 196879 36100
LOWER JHELUM JampKPDD HYDRO-HYDRO 10500 60214 5100
UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 2260 10514 6300
UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 10500 44202 8500
GANDHARBAL JampKPDD HYDRO-HYDRO 1500 8925 4700
KARNAH MPH JampKPDD HYDRO-HYDRO 200 1122 31000
CHENANI I JampKPDD HYDRO-HYDRO 2330 10892 6600
CHENANI II JampKPDD HYDRO-HYDRO 200 1188 9300
CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 750 3634 14200
IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 375 2108 18500
IGO MERCHELLONG JampKPDD HYDRO-HYDRO 300 1572 29700
PAHALGAM MHP JampKPDD HYDRO-HYDRO 450 1713 32900
MARPACHOO JampKPDD HYDRO-HYDRO 075 375 29800
HAFTAL JampKPDD HYDRO-HYDRO 100 483 28700
SANJAK JampKPDD HYDRO-HYDRO 126 441 36000
SEWA-III JampKPDD HYDRO-HYDRO 900 3273 20200
BHADERWAH JampKPDD HYDRO-HYDRO 150 935 8900
BAZGO JampKPDD HYDRO-HYDRO 030 108 33300
SUMOOR JampKPDD HYDRO-HYDRO 010 045 35400
HUNDER JampKPDD HYDRO-HYDRO 040 176 26200
STAKNA JampKPDD HYDRO-HYDRO 400 1933 4100
KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 124000 662879 31360
SURATGARH TPS RRVUNL THERMAL-COAL 150000 402328 41730
CHHABRA TPS 1amp 2 RRVUNL THERMAL-COAL 50000 305946 36700
CHHABRA TPS 3 RRVUNL THERMAL-COAL 25000 151536 36700
CHHABRA TPS 4 RRVUNL THERMAL-COAL 25000 155896 36700
RAMGARH GT POWER PROJECT RRVUNL THERMAL-COAL 22050 43177 41800
RAMGARH GAS T P PROJECT 3 RRVUNL THERMAL-GAS 5000 93615 41800
DHOLPUR C C POWER PROJECT RRVUNL THERMAL-R-LNG 33000 9486 46110
MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 14000 20855 34192
MINI MICRO HYDEL (MMH) P S RRVUNL HYDRO-HYDRO 2385 851 37800
KALISINDH TPP 1 RRVUNL THERMAL-COAL 60000 341543 45000
KALISINDH TPP 2 RRVUNL THERMAL-COAL 60000 211588 45000
KHARA HEP UPJVNL HYDRO-HYDRO 7200 26654 7200
MATATILLA HEP UPJVNL HYDRO-HYDRO 3060 12219 6500
OBRA HEP UPJVNL HYDRO-HYDRO 9900 21517 6300
RIHAND UPJVNL HYDRO-HYDRO 30000 57369 5500
ANPARA A TPS UPRVUNL THERMAL-COAL 63000 317536 27000
ANPARA B TPS UPRVUNL THERMAL-COAL 100000 705605 22700
ANPARA D UPRVUNL THERMAL-COAL 100000 300158 39800
HARDUAGANJ TPS UPRVUNL THERMAL-COAL 16500 45817 49200
HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 50000 304389 46600
OBRA A TPS UPRVUNL THERMAL-COAL 28800 13158 34000
OBRA B TPS UPRVUNL THERMAL-COAL 100000 328124 21900
Page 34
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) PANKI TPS UPRVUNL THERMAL-COAL 21000 66488 50300
PARICHHA TPS UPRVUNL THERMAL-COAL 22000 38762 49400
PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 42000 231931 45600
PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 50000 276722 50400
CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 24000 70845 8290
CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 14400 75366 8390
DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 3375 9595 12080
DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 5100 18701 10520
KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4140 17359 12330
KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 12000 33001 9420
KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 3000 11953 8320
TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 9000 33983 12460
MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 30400 124510 16110
RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 19800 17897 10550
MPUR UTTARAKHAND JVNL HYDRO-HYDRO 930 5121 19200
PATHRI UTTARAKHAND JVNL HYDRO-HYDRO 2040 11636 14200
GALOGI UTTARAKHAND JVNL HYDRO-HYDRO 300 648 12500
PRIVATE SECTOR
MGTPP CLP INDIA PVT LTD THERMAL-COAL 132000 268902 41940
SHRINAGAR HEP ALAKNANDA HPCL HYDRO-HYDRO 33000 127414 48800
GAMA INFRAPROP CCPP GAMA INFRAPROP PVT THERMAL-GAS 22500 52686 47000
PPGCL (BARA) JP POWER VENTURES LTD THERMAL-COAL 198000 448200 38500
MALANA HEP MALANA PCL HYDRO-HYDRO 8600 26354 29792
MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 10000 30369 32580
ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 19200 56347 36079
KASHANG HEP H P PCL HYDRO-HYDRO 19500 5034 29200
BASPA-II HEP HBPCL HYDRO-HYDRO 30000 132769 13600
KARCHAM WANGTOO HEP HBPCL HYDRO-HYDRO 100000 434386 36600
RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 108000 582600 43700
RITHALA COMBI CY POWER PLANT TATA POWER DDL THERMAL-GAS 9480 000 11900
RAJPURA TPS NABHA POWER LTD THERMAL-GAS 140000 901484 39000
TALWANDI SABO POWER LTD TALWANDI SABO POWER LTD THERMAL-COAL 198000 636040 49548
ROJA THERMAL POWER STATION ROJA POWER SCL THERMAL-COAL 120000 727200 43400
KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 34400 63400
BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 36000 62600
MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 38200 60800
UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 37900 61500
KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 42300 58800
LALITPUR PGCL BAJAJ ENERGY PVT LTD THERMAL-COAL 198000 359400 47300
PRAYAGRAJ PGCL PRAYAGRAJ PGCL THERMAL-COAL 132000 448200 38595
KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 132000 783182 33438
WESTERN REGION
CENTRAL SECTOR
INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 100000 325333 23892
OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 52000 141663 34001
GANDHAR CCPP NTPC LTD THERMAL-GAS 65739 221924 28700
KAWAS CCPP NTPC LTD THERMAL-GASN 65620 167929 27000
KORBA I amp II NTPC LTD THERMAL-COAL 210000 1499171 20500
KORBA III NTPC LTD THERMAL-COAL 50000 358746 26600
SIPAT STPS I NTPC LTD THERMAL-COAL 198000 1479902 26800
SIPAT STPS II NTPC LTD THERMAL-COAL 100000 766549 26500
VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 126000 693142 25800
VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 100000 608781 23800
VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 100000 673475 27600
VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 100000 655924 32900
VINDHYACHAL STPS V NTPC LTD THERMAL-COAL 50000 328265 31700
MOUDA I NTPC LTD THERMAL-COAL 100000 343130 44500
MOUDA Ii NTPC LTD THERMAL-COAL 66000 40637 39900
RATNAGIRI GAS amp POWER PVT LTD RGPPL THERMAL-GAS 196708 442485 47000
KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 000 24729
TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 32000 201227 10740
Page 35
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 365122 19069
TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 787444 29324
STATE SECTOR
GSEG-HAZIRA15610 MW GUJARAT S ENEGEN LTD THERMAL-GAS 15610 1805 28200
GSEG-HAZIRA35143 MW GUJARAT S ENEGEN LTD THERMAL-GAS 35130 22276 51300
GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 21978 51800
AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 13929 26100
KORBA TPS EAST CSPGCL THERMAL-COAL 44000 198673 33880
DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 365808 27570
KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 316500 30420
HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 532878 19410
CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 515 58300
MTTPS CHAMPA U-I CSPGCL THERMAL-COAL 50000 220376 39000
MTTPS CHAMPA U-II CSPGCL THERMAL-COAL 50000 23709 10000
SHP GANGREL CSPGCL HYDRO-HYDRO 1000 2350 36790
BANGO HEP CSPGCL HYDRO-HYDRO 12000 14662 8900
MHP KORBA WEST CSPGCL HYDRO-HYDRO 170 859 38190
SIKASAR HEP CSPGCL HYDRO-HYDRO 700 418 26870
DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8843 74500
DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 19446 51500
GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 66388 71600
GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127488 41300
KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 96072 43900
KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 29841 56400
SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 184966 58800
UKAI 1-5 GSECL THERMAL-COAL 85000 204891 46900
UKAI TPS 6 GSECL THERMAL-COAL 50000 284448 48200
WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 271999 58300
WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 82808 44100
KADANA HPS GSECL HYDRO-HYDRO 24200 34433 16800
UKAI HPS GSECL HYDRO-HYDRO 30500 40585 6100
TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 123000 11500
BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 8900 10900
BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 7200 27500
JHINNA HPS MPPGCL HYDRO-HYDRO 2000 9700 18500
RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 44300 3400
GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 17300 4600
SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 4100 16900
MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 14600 27000
PENCH HPS MPPGCL HYDRO-HYDRO 16000 23700 8100
RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 3000 16900
AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 134400 35100
SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 283800 38700
SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 344600 34300
SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 111600 61600
SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 211800 58000
SSTPS PH-I MPPGCL THERMAL-COAL 120000 233100 84300
BHUSAWAL TPS MSPGCL THERMAL-COAL 142000 566258 51100
CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1365682 33700
KHAPERKHEDA MSPGCL THERMAL-COAL 134000 706207 39100
KORADI TPS MSPGCL THERMAL-COAL 62000 443206 42000
NASIK TPS MSPGCL THERMAL-COAL 63000 297275 47000
PARLI TPS MSPGCL THERMAL-COAL 113000 175934 71600
PARAS MSPGCL THERMAL-COAL 50000 267931 38700
URAN CCPP MSPGCL THERMAL-GAS 67200 320330 30600
KOYANA MSPGCL HYDRO-HYDRO 195600 328155 13100
SMALL HYDRO POWER PLANTS MSPGCL HYDRO-HYDRO 45400 93062 30500
BHIRA MSPGCL HYDRO-HYDRO 8000 10046 8400
TILLARI MSPGCL HYDRO-HYDRO 8900 10584 3100
SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 233298 20500
SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 87633 20500
PRIVATE SECTOR
Page 36
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 81282 46750
JNSTPP(JAYPEE NIGRIE) JP POWER VENTURES LTD THERMAL-COAL 132000 726695 29310
MB POWER MB POWER THERMAL-COAL 120000 345632 38310
ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 754922 28671
ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 780761 23495
ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 198000 1263784 32090
ADANI POWER MAHARA ADANI POWER LTD THERMAL-COAL 330000 1666191 34124
AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 170065 36827
SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 252035 45129
ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 458551 36000
ESSAR POWER MP LTD ESSAR POWER MP LTD THERMAL-COAL 60000 243040 28600
VEDANTA LTD (P P -I) VEDANTA LTD THERMAL-GAS 3000 15044 24000
VEDANTA LTD (P P -II) VEDANTA LTD THERMAL-GAS 3000 21293 24000
PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 8234600 24000
165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 5850 64390
145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 68717 40349
SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 132655 28776
SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 144686 38567
MUNDRA UMPPCOASTAL GUJARAT POWER
LTD THERMAL-IMP COAL 400000 2530300
23900
LANCO AMARKANTAK TPP PATHADIH
U-ILANCO AMARKAN POWER LTD THERMAL-COAL 30000 195500
29200
LANCO AMARKANTAK TPP PATHADIH
U-IILANCO AMARKAN POWER LTD THERMAL-COAL 30000 206900
27600
BARADARHA TPS D B POWER LTD THERMAL-COAL 120000 677373 29200
JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 405000 28900
JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 453000 40500
DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 339437 40700
TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 293400 44000
TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 137200 37000
TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 174900 44000
BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 92900 14100
BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23700 34300
KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 27600 48300
CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2530300 23900
BHANDARDRA HEP -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 2475 54900
SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 161400 26500
SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 445000 39000
SOTHERN REGION
CENTRAL SECTOR
NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 325699 54820
NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 305532 39880
NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 998805 38510
NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 113016 54070
NEYVELI TAMILNADU POWER LTD JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 625274 42200
VALLUR TPS NTPC TECL THERMAL-COAL 150000 856438 42350
R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 1493 84300
RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1502919 29400
RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 341291 31800
SIMHADRI I NTPC LTD THERMAL-COAL 100000 688382 36800
SIMHADRI II NTPC LTD THERMAL-COAL 100000 663657 43400
KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 593110 31324
MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 291625 21764
KKNPP-1 amp 2 NPCIL NUCLEAR-NUCLEAR 200000 572609 40948
MINICOY LAKSHADEEP THERMAL-DIESEL 340 770 29600
KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1097 29600
AMINI LAKSHADEEP THERMAL-DIESEL 265 509 29600
ANDROTT LAKSHADEEP THERMAL-DIESEL 219 524 29600
KALPENI LAKSHADEEP THERMAL-DIESEL 175 356 29600
AGATTI LAKSHADEEP THERMAL-DIESEL 195 658 29600
KADMAT LAKSHADEEP THERMAL-DIESEL 190 414 29600
KILTAN LAKSHADEEP THERMAL-DIESEL 150 269 29600
CHETLET LAKSHADEEP THERMAL-DIESEL 100 139 29600
BITRA LAKSHADEEP THERMAL-DIESEL 043 024 29600
BANGARAM LAKSHADEEP THERMAL-DIESEL 018 009 29600
Page 37
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) STATE SECTOR
Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 721811 46500
Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 50000 336142 46500
RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 237358 46500
RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 239926 46500
RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 124500 46500
SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 62109 46500
UPPER SILERU APGENCO HYDRO-HYDRO 24000 33000 46500
LOWER SILERU APGENCO HYDRO-HYDRO 46000 81066 46500
DONKARAI APGENCO HYDRO-HYDRO 2500 6007 46500
PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 1262 46500
CHETTIPETA APGENCO HYDRO-HYDRO 100 214 46500
MUCHKUND APGENCO HYDRO-HYDRO 12000 37571 46500
NAGARJUNASAGAR RCPH APGENCO HYDRO-HYDRO 9000 606 46500
TUNGABHADRA HES amp HAMPI(AP
Share)
APGENCO HYDRO-HYDRO 7200 6100 46500
KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 352232 42600
KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 288131 32500
KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 319272 46500
RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 40073 44300
KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 308317 46000
KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 308963 51300
SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 61004 76600
NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 17960 75300
PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 20873 58300
POCHAMPAD-I TSPGENCO HYDRO-HYDRO 2700 5455 29800
POCHAMPAD-II TSPGENCO HYDRO-HYDRO 900 1932 40700
NIZAMSAGAR TSPGENCO HYDRO-HYDRO 1000 1126 53400
RAICHUR TPS 1 to 7 KPCL THERMAL-COAL 147000 890866 43800
RAICHUR TPS 8 KPCL THERMAL-COAL 25000 159523 48200
BELLARI TPS 1 KPCL THERMAL-COAL 50000 318679 51100
BELLARI TPS 2 KPCL THERMAL-COAL 50000 232347 55600
BELLARI TPS 3 KPCL THERMAL-COAL 70000 47565 34400
BHADRA PH KPCL HYDRO-HYDRO 3920 2369 45900
GERUSUPPA PH KPCL HYDRO-HYDRO 24000 26990 22000
GHAT PRABHA HEP KPCL HYDRO-HYDRO 3200 4777 25300
KADRA HPS KPCL HYDRO-HYDRO 15000 16889 26800
NAGJHARI KPCL HYDRO-HYDRO 90000 155159 9800
KODASALLI DPH KPCL HYDRO-HYDRO 12000 14854 19200
MUNIRA+MGH+SPH+SPH KPCL HYDRO-HYDRO 22640 48211 7900
SHARAVATHY HPS KPCL HYDRO-HYDRO 108550 276215 5400
ALMATTI DPH KPCL HYDRO-HYDRO 29000 39611 24600
VARAHI UGPH KPCL HYDRO-HYDRO 46000 71368 15600
IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 17196 15300
IDUKKI HPS KSEB HYDRO-HYDRO 78000 137905 15300
KAKKAD HPS KSEB HYDRO-HYDRO 5000 13063 15300
KALLADA HPS KSEB HYDRO-HYDRO 1500 4436 15300
KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 46544 15300
KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 635 15300
LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 30822 15300
MALANKARA HPS KSEB HYDRO-HYDRO 1050 2474 15300
MATTUPETTY KSEB HYDRO-HYDRO 200 230 15300
MALAMPUZHA KSEB HYDRO-HYDRO 250 063 15300
CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 864 15300
URUMI ST I amp II KSEB HYDRO-HYDRO 615 903 15300
LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 248 15300
NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7765 19625 15300
PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 16601 15300
PANNIAR HPS KSEB HYDRO-HYDRO 3240 6217 15300
PORINGALKUTHU KSEB HYDRO-HYDRO 3600 10052 15300
PORINGALKUTHU LBE KSEB HYDRO-HYDRO 1600 9438 15300
PEPPARA KSEB HYDRO-HYDRO 300 395 15300
POOZHITHODE KSEB HYDRO-HYDRO 480 1045 15300
Page 38
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) PEECHI KSEB HYDRO-HYDRO 125 040 15300
RANI-PERUNADU KSEB HYDRO-HYDRO 400 585 15300
SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 79783 15300
SENGULAM HPS KSEB HYDRO-HYDRO 5120 11558 15300
SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 16711 15300
VILANGAD KSEB HYDRO-HYDRO 750 1578 15300
BARAPOLE KSEB HYDRO-HYDRO 1500 1932 15300
VELLATHOOVAL KSEB HYDRO-HYDRO 360 305 15300
CHIM0NY KSEB HYDRO-HYDRO 250 156 15300
ADYANPARA KSEB HYDRO-HYDRO 350 501 15300
BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 554 15300
KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 3801 15300
KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 23132 32800
ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 14416 62280
METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 523970 62280
METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 321270 62280
NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 336575 62280
NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 591240 62280
TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 508966 62280
KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 30897 62280
VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 18720 90699 62280
KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 33593 62280
BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 1047 62280
PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 1250 62280
PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 330 62280
MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 4897 62280
MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 032 62280
KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15681 62280
KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 40608 62280
KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 21342 62280
KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 4717 62280
KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4322 62280
KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2399 62280
METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 4416 62280
METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 8035 62280
BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2187 62280
BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2359 62280
BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2511 62280
BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 1949 62280
BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 1819 62280
POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 172 62280
SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 241 62280
MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 026 62280
THIRUMOORTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 136 62280
PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 9309 62280
VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 353 62280
SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 4192 62280
PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 6571 62280
SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 1186 62280
SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6319 62280
ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 6122 62280
KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 28674 62280
SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 18381 62280
SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 4258 62280
KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 12680 62280
KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4201 62280
ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 000 62280
PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 19175 62280
AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 078 62280
BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 504 62280
BHAVANI KATTALAI (BKB)(IIIampIII BB I amp II)TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 5847 62280
PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 000 62280
Page 39
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) SRI DAMODARAM STPS APPDCL THERMAL-COAL 160000 808108 36300
PRIVATE SECTOR
KARUPPUR TANJORE LANCO TANJORE PCL THERMAL-GAS 12000 48096 28770
SIMHAPURI ENERGY LTD SIMHAPURI ENERGY LTD THERMAL-COAL 60000 143900 39100
JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 7111 45500
SBU 1 JSW ENERGY LTD
VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 26000 159100
43300
SBU 2 JSW ENERGY LTD
VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 60000 247900
42800
LANCO KPLLANCO KONDAPALLI POWER
LTDTHERMAL-GAS 36814 85060
25776
LANCO KPL STG -IILANCO KONDAPALLI POWER
LTDTHERMAL-GAS 36600 12979
46330
LANCO KPL STG -IIIALANCO KONDAPALLI POWER
LTDTHERMAL-GAS 37100 85710
46330
LANCO KPL STG -III BLANCO KONDAPALLI POWER
LTDTHERMAL-GAS 37100 43639
46330
HINDUJA NATIONAL PCL HINDUJA NATIONAL PCL THERMAL-COAL 104000 303000 38200
MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 121164 49940
UDUPI POWER COR LTD ADANI POWER LTD THERMAL-COAL 120000 754613 42500
SPECTRUM POWER GENERATION
LTD SPECTRUM PG LTD THERMAL-GASN 20525 9256812
34952
TAQA NEYVELI POWER COM PVT
LTD TAQA NEYVELI THERMAL-LIG 25000 5840
34500
ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 251000 51000
ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 207860 36800
GMR VEMAGIRI POWER GENERATION
LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 30117
46450
EASTERN REGION
CENTRAL SECTOR
MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 64675 53113
MTPS STAGE - II KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 39000 1432 69138
BOKARO `B` TPS DVC THERMAL-COAL 63000 145670 31539
MEJIA TPS U 1-3 DVC THERMAL-COAL 63000 348298 31552
MEJIA TPS U 4 DVC THERMAL-COAL 21000 116099 34997
MEJIA TPS U 5-6 DVC THERMAL-COAL 50000 276427 35976
MEJIA TPS U 7-8 DVC THERMAL-COAL 100000 552854 36991
DURGAPUR STEEL TPS DVC THERMAL-COAL 100000 665550 39323
DURGAPUR TPS DVC THERMAL-COAL 21000 59270 35416
RAGHUNATHPUR TPS DVC THERMAL-COAL 120000 201650 35326
MAITHON HYDEL STA DVC HYDRO-HYDRO 6320 12200 17984
CHANDRAPURA TPSU1-3 DVC THERMAL-COAL 42000 257610 35095
CHANDRAPURA TPSU7-8 DVC THERMAL-COAL 50000 306673 34987
KODERMA TPS DVC THERMAL-COAL 100000 380180 38131
PANCHET HPS DVC HYDRO-HYDRO 8000 13360 17984
TILLAYA HPS DVC HYDRO-HYDRO 400 1410 17984
RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34700 35400
TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 277300 23200
TLDP -III NHPC LTD HYDRO-HYDRO 13200 55400 62000
TLDP -IV NHPC LTD HYDRO-HYDRO 16000 60300 25600
FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 957219 33700
FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 308943 41000
BONGAINGAON TPS NTPC LTD THERMAL-COAL 25000 153663 58600
KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 542277 34200
KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 942591 34200
BARH-II NTPC LTD THERMAL-COAL 132000 728021 44500
TALCHER TPS NTPC LTD THERMAL-COAL 46000 335521 30100
TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 702319 25600
TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1436521 24700
STATE SECTOR
BTPS(RampM) BIHAR STATE PGCL THERMAL-COAL 22000 12142 39700
BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 98331 10602
HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 50593 9482
CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 19689 2605
RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 53192 6033
UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 147208 14637
Page 40
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 60353 4519
IB TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 288567 25000
J P H GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 210 038 61100
MEYONG CHU GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 400 1086 61100
TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 122667 38200
DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 214339 43321
KOLAGHAT THERMAL POWER
STATION
WEST BENGAL PDCL THERMAL-COAL 126000 538269 31603
BAKRESHWAR THERMAL POWER
PLANT
WEST BENGAL PDCL THERMAL-COAL 105000 634876 32154
BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 45000 166855 33299
SANTHALDIH THERMAL POWER
STATION
WEST BENGAL PDCL THERMAL-COAL 50000 336442 34932
SAGARDIGHI THERMAL POWER
PROJECT
WEST BENGAL PDCL THERMAL-COAL 160000 423121 34705
JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 20344 68900
RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 24559 68900
TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 4623 68900
PURULIA PUMPED STORAGE
PROJECT
WEST BENGAL SEDCL HYDRO-HYDRO 90000 108816 68900
MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2768 68900
PRIVATE SECTOR
CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 49474 20230
CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 555500 70200
HALDIA ENERGY HALDIA ENERGY LTD THERMAL-COAL 60000 371000 50400
DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3688 63400
KAMALANGA TPS GMR KAMALANGA ENERGY LTD THERMAL-COAL 105000547670
33300
ADHUNIK POWER U-1 ADHUNIK POWER THERMAL-COAL 27000 158 44060
ADHUNIK POWER U-2 ADHUNIK POWER THERMAL-COAL 27000 168 44250
VL-JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 332800 23622
JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 43000 45250
JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 71700 37030
JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 70700 35920
JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 71100 38870
JOJOBERA UNIT 5 TATA POWER COM LTD THERMAL-COAL 12000 79300 44560
JOJOBERA UNIT 6 TATA POWER COM LTD THERMAL-WHR 12000 83700 12840
IEL KALINGANAGAR U-I TATA POWER COM LTD THERMAL-WG 6750 33400 22500
IEL KALINGANAGAR U-II TATA POWER COM LTD THERMAL-WG 6750 34800 22500
MAITHON UNIT 1 amp 2 TATA POWER COM LTD THERMAL-COAL 105000 678000 36100
HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 27500 24340
HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 28400 24340
HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 15800 24310
NORTH EASTERN REGION
CENTRAL SECTOR
LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 74100 36600
AGARTALA GT NEEPCO THERMAL-GAS 13500 88611 27210
ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 153111 32310
DOYANG HEP NEEPCO HYDRO-HYDRO 7500 25598 49801
KOPILI HEP NEEPCO HYDRO-HYDRO 20000 98186 11491
KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 19582 20237
KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 10310 17968
RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 124093 22945
TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 10100 17344 39000
STATE SECTOR
HYDRO POWER (122 Stns) ITANAGAR GOVT OF ARUNACHAL
PRADESHHYDRO-HYDRO 6971 6217270
24600
KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39514 17337
LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 82327 36810
NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 33318 48290
MYNTRIANG SHEP ST II ASSAM POWER GENCO HYDRO-HYDRO 300 567 35776
LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 9130 49200
LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 012 49200
DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 022 49200
TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 000 49200
UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 4990 16000
UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 6476 37000
UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 16494 14600
UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 3600 9556 15000
SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 758 8000
MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44070 44800
KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 154 41400
TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 091 41400
MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 411 41400
MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 394 41400
KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 760 41400
SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 3264 41400
LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 044 41400
BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 18953 28000
ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 43585 28200
GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 4080 11100
Note
LIG Lignite N Naptha WHR Waste Heat Recovery
Page 41
SN Contents Page
1 Energy Power Supply Position (Provisional) for Apr-2019 and during Apr-19 to Apr-19 23
2 Peak Power Supply Position (Provisional) for Apr-2019 and during Apr-19 to Apr-19 24
3 Energy Power Supply Position (Revised) for Mar-2019 and during Apr-19 to Mar-19 25
4 Peak Power Supply Position (Revised) for Mar-2019 and during Apr-19 to Mar-19 26
5 Notified Power cuts Restrictions on Industries during Apr-2019 27
6 Power Supply to Agricultural Sector during Apr-2019 28
Section F - Power supply position
आकड़ मममलयन यननट नट Figures in MU net
ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied
कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )
चडीगढ़ Chandigarh 117 117 0 00 117 117 0 00
दिलली Delhi 2698 2698 1 00 2698 2698 1 00
हरियजणज Haryana 3773 3773 0 00 3773 3773 0 00
दहमजचल परिश Himachal Pradesh 777 777 0 00 777 777 0 00
रमम कशमीि Jammu amp Kashmir 1604 1296 308 192 1604 1296 308 192
परजब Punjab 3646 3646 0 00 3646 3646 0 00
िजरसथजन Rajasthan 6210 6208 2 00 6210 6208 2 00
उतति परिश Uttar Pradesh 10179 10148 32 03 10179 10148 32 03
उततिजखड Uttarakhand 1120 1120 0 00 1120 1120 0 00
उततरी कषतर Northern Region 30094 29786 308 10 30094 29786 308 10
छततीसगढ़ Chhattisgarh 2684 2676 8 03 2684 2676 8 03
गरिजत Gujarat 10718 10718 0 00 10718 10718 0 00
मधय परिश Madhya Pradesh 6006 6006 0 00 6006 6006 0 00
महजिजषटर Maharashtra 14308 14308 0 00 14308 14308 0 00
िमन औि दिउ Daman amp Diu 220 220 0 00 220 220 0 00
िजिि व नगि हवली Dadra amp Nagar Haveli 552 552 0 00 552 552 0 00
गोवज Goa 388 388 0 00 388 388 0 00
पशचिमी कषतर Western Region 34875 34868 8 00 34875 34868 8 00
आनधर परिश Andhra Pradesh 5708 5708 0 00 5708 5708 0 00
तलगजनज Telangana 5725 5725 0 00 5725 5725 0 00
कनजाटक Karnataka 7003 7003 0 00 7003 7003 0 00
किल Kerala 2402 2400 2 01 2402 2400 2 01
तममल नजड Tamil Nadu 10010 10010 0 00 10010 10010 0 00
पडचिी Puducherry 263 263 0 00 263 263 0 00
लकष-दवीप Lakshadweep 4 4 0 0 4 4 0 0
दकषकषणी कषतर Southern Region 31111 31109 2 00 31111 31109 2 00
बबहजि Bihar 2589 2589 0 00 2589 2589 0 00
िजमोिि घजटी ननगम DVC 1772 1772 0 00 1772 1772 0 00
झजिखणड Jharkhand 689 689 0 00 689 689 0 00
ओडडशज Odisha 2689 2689 1 00 2689 2689 1 00
पशशचम बगजल West Bengal 5075 5075 0 00 5075 5075 0 00
मसशककम Sikkim 37 37 0 00 37 37 0 00
अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 7 29 27 2 7
परवी कषतर Eastern Region 12851 12850 1 00 12851 12850 1 00
अरणजचल परिश Arunachal Pradesh 66 66 0 05 66 66 0 05
असम Assam 766 709 57 75 766 709 57 75
मणणपि Manipur 68 67 1 15 68 67 1 15
मघजलय Meghalaya 170 160 10 59 170 160 10 59
ममज़ोिम Mizoram 54 53 0 08 54 53 0 08
नजगजलड Nagaland 54 54 0 08 54 54 0 08
बिपिज Tripura 122 120 1 12 122 120 1 12
उततर-परवी कषतर North-Eastern Region 1300 1228 71 55 1300 1228 71 55
समपणण भारत All India 110231 109842 389 04 110231 109842 389 04
23
ऊरजा पनत ा म कमी ऊरजा पनत ा म कमीEnergy not Supplied
Excludes energy exported to Bangladesh
Energy not Supplied
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
ऊराण वरवदयत आपरत ण शथिरत ररपोरण (परवाणरवलोकन) Energy Power Supply Position Report (Provisional)
राजयState
अपरल 2019 April2019 अपरल2019 -अपरल2019 April2019 to April2019
अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met
कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )
चडीगढ़ Chandigarh 256 256 0 00 256 256 0 00
दिलली Delhi 5664 5664 0 00 5664 5664 0 00
हरियजणज Haryana 8127 8127 0 00 8127 8127 0 00
दहमजचल परिश Himachal Pradesh 1387 1387 0 00 1387 1387 0 00
रमम कशमीि Jammu amp Kashmir 2826 2261 565 200 2826 2261 565 200
परजब Punjab 7015 7015 0 00 7015 7015 0 00
िजरसथजन Rajasthan 10560 10560 0 00 10560 10560 0 00
उतति परिश Uttar Pradesh 19935 19935 0 00 19935 19935 0 00
उततिजखड Uttarakhand 1922 1922 0 00 1922 1922 0 00
उततरी कषतर Northern Region 54476 53985 491 09 54476 53985 491 09
छततीसगढ़ Chhattisgarh 4596 4574 22 05 4596 4574 22 05
गरिजत Gujarat 17871 17865 6 00 17871 17865 6 00
मधय परिश Madhya Pradesh 10018 10018 0 00 10018 10018 0 00
महजिजषटर Maharashtra 23158 23150 8 00 23158 23150 8 00
िमन औि दिउ Daman amp Diu 341 340 1 02 341 340 1 02
िजिि व नगि हवली Dadra amp Nagar Haveli 818 818 0 00 818 818 0 00
गोवज Goa 594 594 0 00 594 594 0 00
पशचिमी कषतर Western Region 56242 56222 20 00 56242 56222 20 00
आनधर परिश Andhra Pradesh 9151 9151 0 00 9151 9151 0 00
तलगजनज Telangana 10191 10191 0 00 10191 10191 0 00
कनजाटक Karnataka 12681 12681 0 00 12681 12681 0 00
किल Kerala 4309 4300 8 02 4309 4300 8 02
तममल नजड Tamil Nadu 15972 15972 0 00 15972 15972 0 00
पडचिी Puducherry 482 480 2 05 482 480 2 05
लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0
दकषकषणी कषतर Southern Region 49155 49103 52 01 49155 49103 52 01
बबहजि Bihar 5357 5357 0 00 5357 5357 0 00
िजमोिि घजटी ननगम DVC 3039 3039 0 00 3039 3039 0 00
झजिखणड Jharkhand 1266 1266 0 00 1266 1266 0 00
ओडडशज Odisha 5389 5389 0 00 5389 5389 0 00
पशशचम बगजल West Bengal 8666 8666 0 00 8666 8666 0 00
मसशककम Sikkim 100 100 0 00 100 100 0 00
अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7
परवी कषतर Eastern Region 23349 23349 0 00 23349 23349 0 00
अरणजचल परिश Arunachal Pradesh 139 136 3 22 139 136 3 22
असम Assam 1712 1667 45 26 1712 1667 45 26
मणणपि Manipur 197 188 9 46 197 188 9 46
मघजलय Meghalaya 336 336 0 00 336 336 0 00
ममज़ोिम Mizoram 116 113 3 26 116 113 3 26
नजगजलड Nagaland 157 131 26 166 157 131 26 166
बिपिज Tripura 292 291 1 03 292 291 1 03
उततर-परवी कषतर North-Eastern Region 2848 2780 68 24 2848 2780 68 24
समपणण भारत All India 177411 176810 601 03 177411 176810 601 03
24
मजग की पनत ा म कमी Demand not Met
Excludes the supply to Bangladesh
राजयStateअपरल 2019 April2019
मजग की पनत ा म कमी Demand not Met
अधिकतम वरवदयत आपरत ण शथिरत ररपोरण (परवाणरवलोकन) Peak Power Supply Position Report (Provisional)
आकड़ मगज वजट नट Figures in MW netअपरल2019 -अपरल2019 April2019 to April2019
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
आकड़ मममलयन यननट नट Figures in MU net
ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied
कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )
चडीगढ़ Chandigarh 96 96 0 00 1561 1561 0 00
दिलली Delhi 1931 1930 1 00 32299 32282 17 01
हरियजणज Haryana 3658 3658 0 00 53665 53665 0 00
दहमजचल परिश Himachal Pradesh 832 830 2 02 9850 9618 232 24
रमम कशमीि Jammu amp Kashmir 1767 1414 353 200 19593 15868 3725 190
परजब Punjab 3585 3585 0 00 55288 55275 13 00
िजरसथजन Rajasthan 6774 6770 4 01 79826 79637 189 02
उतति परिश Uttar Pradesh 8754 8691 63 07 117101 116118 984 08
उततिजखड Uttarakhand 1067 1067 0 00 13845 13753 92 07
उततरी कषतर Northern Region 28464 28041 423 15 383028 377776 5251 14
छततीसगढ़ Chhattisgarh 2464 2457 8 03 26130 26076 54 02
गरिजत Gujarat 9890 9890 0 00 116588 116572 15 00
मधय परिश Madhya Pradesh 6236 6236 0 00 75667 75665 2 00
महजिजषटर Maharashtra 13631 13631 0 00 158285 158148 137 01
िमन औि दिउ Daman amp Diu 221 221 0 00 2557 2557 0 00
िजिि व नगि हवली Dadra amp Nagar Haveli 553 553 0 00 6317 6317 0 00
गोवज Goa 362 362 0 00 4283 4280 3 01
पशचिमी कषतर Western Region 33357 33349 8 00 389827 389615 212 01
आनधर परिश Andhra Pradesh 6072 6071 1 00 63735 63677 58 01
तलगजनज Telangana 6930 6929 1 00 66697 66635 62 01
कनजाटक Karnataka 7614 7612 1 00 71759 71690 69 01
किल Kerala 2489 2488 1 00 25029 24911 118 05
तममल नजड Tamil Nadu 10247 10245 2 00 109375 109273 102 01
पडचिी Puducherry 252 251 1 04 2761 2751 10 03
लकष-दवीप Lakshadweep 4 4 0 0 46 46 0 0
दकषकषणी कषतर Southern Region 33605 33597 8 00 339355 338938 417 01
बबहजि Bihar 2319 2318 1 00 30052 29827 225 07
िजमोिि घजटी ननगम DVC 1773 1772 1 00 22365 21995 369 17
झजिखणड Jharkhand 698 697 1 01 8682 8461 221 25
ओडडशज Odisha 2583 2582 1 00 31810 31781 30 01
पशशचम बगजल West Bengal 4585 4584 2 00 52237 52078 159 03
मसशककम Sikkim 41 41 0 00 513 512 0 01
अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 67 346 323 23 67
परवी कषतर Eastern Region 11999 11995 5 00 145658 144654 1004 07
अरणजचल परिश Arunachal Pradesh 61 60 0 06 864 855 9 10
असम Assam 680 656 23 34 9532 9204 328 34
मणणपि Manipur 68 68 1 09 916 906 10 11
मघजलय Meghalaya 173 173 0 03 1955 1953 1 01
ममज़ोिम Mizoram 50 49 0 09 668 661 8 12
नजगजलड Nagaland 58 57 1 20 902 809 93 103
बिपिज Tripura 150 150 0 00 1859 1837 21 11
उततर-परवी कषतर North-Eastern Region 1240 1214 26 21 16696 16225 471 28
समपणण भारत All India 108665 108196 469 04 1274564 1267209 7355 06
Note The revised data for March 2019 is not avaliable
Excludes energy exported to Bangladesh
राजयState
ऊराण वरवदयत आपरत ण शथिरत ररपोरण (परवाणरवलोकन) Energy Power Supply Position Report (Provisional)
25
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
Energy not Supplied Energy not Supplied
मािण2019 March2019 अपरल2018 -मािण2019 April2018 to March2019
ऊरजा पनत ा म कमी ऊरजा पनत ा म कमी
अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met
कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )
चडीगढ़ Chandigarh 223 223 0 00 369 369 0 00
दिलली Delhi 4016 4016 0 00 7016 7016 0 00
हरियजणज Haryana 6544 6544 0 00 10270 10270 0 00
दहमजचल परिश Himachal Pradesh 1683 1683 0 00 1700 1700 0 00
रमम कशमीि Jammu amp Kashmir 3277 2622 655 200 3277 2622 655 200
परजब Punjab 6564 6564 0 00 12638 12638 0 00
िजरसथजन Rajasthan 11885 11885 0 00 13276 13276 0 00
उतति परिश Uttar Pradesh 16220 16220 0 00 20498 20062 436 21
उततिजखड Uttarakhand 2002 2002 0 00 2216 2216 0 00
उततरी कषतर Northern Region 47925 47356 569 12 63166 61726 1440 23
छततीसगढ़ Chhattisgarh 4444 4128 316 71 4444 4270 174 39
गरिजत Gujarat 16263 16263 0 00 17053 16963 90 05
मधय परिश Madhya Pradesh 12328 12323 5 00 13815 13815 0 00
महजिजषटर Maharashtra 22361 22291 70 03 23864 23254 610 26
िमन औि दिउ Daman amp Diu 336 336 0 01 357 356 1 02
िजिि व नगि हवली Dadra amp Nagar Haveli 800 799 1 01 816 815 1 01
गोवज Goa 538 538 0 00 596 596 0 00
पशचिमी कषतर Western Region 53132 52965 167 03 56675 55821 853 15
आनधर परिश Andhra Pradesh 8977 8977 0 00 9459 9453 6 01
तलगजनज Telangana 10471 10471 0 00 10815 10815 0 00
कनजाटक Karnataka 12841 12841 0 00 12841 12841 0 00
किल Kerala 4264 4228 36 09 4264 4228 36 09
तममल नजड Tamil Nadu 15712 15712 0 00 15712 15712 0 00
पडचिी Puducherry 427 412 15 34 427 412 15 34
लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0
दकषकषणी कषतर Southern Region 49464 49464 0 00 49464 49464 0 00
बबहजि Bihar 4633 4633 0 00 5115 5084 31 06
िजमोिि घजटी ननगम DVC 3035 3035 0 00 3035 3035 0 00
झजिखणड Jharkhand 1210 1210 0 00 1339 1291 48 36
ओडडशज Odisha 4827 4827 0 00 5357 5357 0 00
पशशचम बगजल West Bengal 8287 8287 0 00 9130 9123 7 01
मसशककम Sikkim 100 100 0 00 106 106 0 00
अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7
परवी कषतर Eastern Region 21658 21658 0 00 23141 22733 408 18
अरणजचल परिश Arunachal Pradesh 133 131 2 15 138 138 0 01
असम Assam 1539 1508 31 20 1865 1809 56 30
मणणपि Manipur 204 199 5 25 219 216 3 12
मघजलय Meghalaya 357 357 0 00 374 372 1 04
ममज़ोिम Mizoram 108 105 3 28 121 119 2 17
नजगजलड Nagaland 127 125 2 16 156 138 18 116
बिपिज Tripura 249 249 0 00 298 293 5 17
उततर-परवी कषतर North-Eastern Region 2540 2535 5 02 2967 2850 117 39
समपणण भारत All India 169464 168745 719 04 177022 175528 1494 08
Note The revised data for March 2019 is not avaliable 26
अधिकतम वरवदयत आपरत ण शथिरत ररपोरण (परवाणरवलोकन) Peak Power Supply Position Report (Provisional)
आकड़ मगज वजट नट Figures in MW net
राजयStateमािण2019 March2019 अपरल2018 -मािण2019 April2018 to March2019
मजग की पनत ा म कमी मजग की पनत ा म कमी Demand not MetDemand not Met
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
Excludes the supply to Bangladesh
अपरल 2019 April2019 अपरल2018 -मािण2019 April2019 to April2019
उततरी कषतर Northern Region
चडीगढ़ Chandigarh(Data Not Received)दिलली Delhi
हरियजणज Haryana
दहमजचल परिश Himachal Pradeshरमम कशमीि Jammu amp Kashmir(Data
Not Received)परजब Punjab
िजरसथजन Rajasthanउतति परिश Uttar Pradesh
उततिजखड Uttarakhand
पशचिमी कषतर Western Region
छततीसगढ़ Chhattisgarh
Apr-Nov 2018- No cuts
Maximum Demand cut-58MW
Energy cut- 00020-00032 MUsday
गरिजत Gujarat
मधय परिश Madhya Pradesh
महजिजषटर Maharashtra
गोवज Goa
दकषकषणी कषतर Southern Region
आनधर परिश Andhra Pradesh
तलगजनज Telangana
कनजाटक Karnataka
किल Kerala
तममल नजड Tamil Nadu
पडचिी Puducherryपरवी कषतर Eastern Region
बबहजि Bihar
झजिखणड Jharkhand
ओडडशज Odisha
पशशचम बगजल West Bengal
No N
otifie
d Cu
ts
27
मािण 2019 म इडथरीर पर वरवदयत करौती का वरवरवरण Notified Power CutsRestrictions on Industries during April2019
राजय कषतर State Regionऊराणमाग करौती EnergyDemand Cut
No N
otifie
d Cu
tsNo
Notifie
d Cu
ts
अपरल2019 April 2019 अपरल2019 -अपरल2019 April2019 to April2019
उततरी कषतर Northern Region
चडीगढ़ Chandigarh Data not received Data not received
दिलली Delhi Data not received Data not received
हरियजणज Haryana 0811 hrsday 0811 hrsday
दहमजचल परिश Himachal Pradesh HPSEBL has only 2 agriculture consumers and uninterrupted
power is being supplied to agriculture sector
HPSEBL has only 2 agriculture consumers and uninterrupted
power is being supplied to agriculture sector
रमम कशमीि Jammu amp Kashmir Data not received Data not received
परजब Punjab 379 hrsday 379 hrsday
िजरसथजन Rajasthan 0630 hrsday 0630 hrsday
उतति परिश Uttar Pradesh 2157 hrsday 2157 hrsday
उततिजखड Uttarakhand 2359 hrsday 2359 hrsday
पशचिमी कषतर Western Region
छततीसगढ़ Chhattisgarh 18 hrsday 18 hrsday
गरिजत Gujarat 8 hrsday 8 hrsday
मधय परिश Madhya Pradesh Three-Phase Supply(Irrigation)- 0953 hrs day Three-Phase
(Mixed) Supply - 2334 hrs day
Three-Phase Supply(Irrigation)- 0953 hrs day Three-Phase
(Mixed) Supply - 2334 hrs day
महजिजषटर Maharashtra Three-Phase Supply(Irrigation)- 9 hrs day Three-Phase Supply(Irrigation)- 9 hrs day
गोवज Goa No restriction No restriction
दकषकषणी कषतर Southern Region
आनधर परिश Andhra Pradesh 07 hrsday 07 hrsday
तलगजनज Telangana 24 hrsday 24 hrsday
कनजाटक Karnataka 6 hrsday 6 hrsday
किल Kerala No Restrictions No Restrictions
तममल नजड Tamil Nadu 9 hrsday (6 hrs during day time and 3 hrs during night time) 9 hrsday (6 hrs during day time and 3 hrs during night time)
पडचिी Puducherry No Restrictions No Restrictions
परवी कषतर Eastern Region
बबहजि Bihar 18 hrsday 18 hrsday
झजिखणड Jharkhand 20 hrsday 20 hrsday
ओडडशज Odisha 24 hrsday 24 hrsday
पशशचम बगजल West Bengal 23 hrsday 23 hrsday
28
मारच 2019 कषि कषतर को षिदयत आपरतच का षििरण Power Supply to Agricultural Sector during March2019
राजय कषतर State Regionऔसत वरवदयत आपरत ण घनरो म Average Hours of Supply
On segregated feeders
SNo Contents Page
1 Growth of Installed Capacity since 6th Plan 29
2 Progress of Transmission Sector since 6th Plan 30
3 All India Yearly Coal consumption for Power Generation (Utilities)
4 All India Annual Per Capita Consumption of Electricity since -2006
5 Average cost of power supply amp Average realisation (Paisakwh)
6 Growth of Rural Electrification amp Pump Sets Energisation
7 Status of Hydro Schemes Cleared by the CEA in Apr-2019
Section G - Growth of Power Sector
31
32
(In MW)
Coal Gas Diesel Total
End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472
End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634
End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537
End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596
End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921
End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703
End of 12th Plan 19216288 2532938 83763 21832988 6780 4447842 50018 31960630
Up to Apr-2019 20070450 2493722 63763 22627934 678000 4539922 7764163 35610019
Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-17) = 51529 MW
Electricity Generation (MU) Targets and Achievements for 2016-17
Coal Gas Diesel Nuclear Hydro Res Total
2007045 2493722 637629 678000 453992 77641625 22925174
29
1 Growth of Installed Capacity Since 6th Plan
Plan YearThermal
Nuclear Hydro RES (MNRE) Total
2007045
2493722637629
678000
4539922
77641625
Total Installed Capacity 35610019 MW
Coal Gas Diesel Nuclear Hydro Res
Progress of Transmission Sector in the Country up to April 2019
1 TRANSMISSION LINES (All fig in CKM)
At the end of
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
6th plan 0 0 0 0 0 0 0 0 0 0 0 0 1831 4198 0 6029 1641 44364 0 46005 3472 48562 0 52034
7th plan 0 0 0 0 0 0 0 0 0 0 0 0 13068 6756 0 19824 4560 55071 0 59631 17628 61827 0 79455
8th plan 0 0 0 0 1634 0 0 1634 0 0 0 0 23001 13141 0 36142 6564 73036 0 79600 31199 86177 0 117376
9th plan 0 0 0 0 3234 1504 0 4738 751 409 0 1160 29345 20033 0 49378 8687 88306 0 96993 42017 110252 0 152269
10th plan 0 0 0 0 4368 1504 0 5872 1775 409 0 2184 48708 24730 0 73438 9444 105185 0 114629 64295 131828 0 196123
11th Plan 0 0 0 0 5948 1504 1980 9432 4839 411 0 5250 71023 30191 5605 106819 10140 125010 830 135980 91950 157116 8415 257481
12th Plan 6124 0 0 6124 5948 1504 1980 9432 25465 1177 4598 31240 92482 48240 17065 157787 11014 151276 978 163268 141033 202197 24621 367851
13th Plan (Up
to Mar2019)6124 0 0 6124 5948 1504 1980 9432 33692 1512 6605 41809 101335 58238 21173 180746 11734 162552 1010 175296 158833 223806 30768 413407
13th Plan (Up
to Apr-19)6124 0 0 6124 5948 1504 1980 9432 33745 1512 6605 41862 101335 58258 21173 180766 11734 162953 1010 175697 158886 224227 30768 413881
27150 600 MW of 132 kV Inter-Regional power transmission capacity links which are operated radially from time to time is not added in the total
75050
47900
24000
99050
30
Grand Total
Note - The figure upto the end of 10th plan in for stringing progress including the lines not commissioned Now only commissioned lines are reckoned Accordingly the figure for 10th plan (end) may read
as 187555 after adjusting with (-) 10852 Ckm
Inter-regional Power Transfer Capacity (MW)
plusmn 800 kV HVDC plusmn 500 kV HVDC 765 kV 400 kV 220 kV
IR addition in 12th
Plan (up to March
2017)
Inter-regional
Transmission
Capacity at the end
of Plan Period 2017-
22 (as on April19)
IR at the end of 11th
PlanIR at the end of 12th
Plan
IR Capacity Addition
at the end of Plan
Period 2017-22 (Till
April 19)
2004-05 27800
2005-06 28100
2006-07 30200
2007-08 33000
2008-09 35500
2009-10 36700
2010-11 38700
2011-12 41756
2012-13 45460
2013-14 48940
2014-15 53040
2015-16 54590
2016-17 57430
2017-18 60800
2018-19 62890
Year
2005-06
2006-07
2007-08
2008-09
2009-10
2010-11
2011-12
2012-13
2013-14
2014-15
2015-16
2016-17
2017-18
2018-19
2004-05 254 209 7568
2005-06 260 221 7636
2006-07 276 227 7423
2007-08 293 239 7727
2008-09 340 263 8713
2009-10 355 268 8870
2010-11 398 303 11975
2011-12 455 330 13514
2012-13 501 376 14867
2013-14 518 175
2014-15 520
Source- PFC Reports on the performance of State Power Utilities 31
1181
7335
7786
91441
8188
88363
957
1010
1075
1122
1149
(GrossGen+ Net Import) Mid-year population Provisional
5 Average cost of power supply amp average realization ( paiseKWH )
Yearcost of supply
(paiseunit)
Realization(paiseunit)
Including AgricultureOnly
Agriculture
6719
7171
3 All India yearly Coal Consumption for Power Generation (Utilities)
YEARCoal Consumption
Million Tonnes
4 All India Annual per Capita consumption of Electricity Since 2006
Per Capita Consumption ( kWh)
6314
Sl
NoExecuting Agency
Installed
Capacity (MW)Cost (Rs crore)
Date of
Clearance
32
Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as
Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received
from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made
available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified
villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is
independent of the earlier published reports
No Hydro Electric Project has been issued concurrenceAppraisal letter by CEA during April 2019
7 Status of Hydro Schemes Cleared by the CEA in Apr-2019
Name of Scheme
1999-002000-01
297594
010408 to 310309010409 to 310310
10th Plan
2005-062006-07
322968331020
6 Growth Of Rural Electrification amp Pumpsets Energisation
Plan Year
9th Plan2002-03
134092626
4111
Pump Sets Energised Villages Electricfied (Nos)
2001-02
284064367244
1218
27801997-981998-99
3207
482864
12632
1576036
4451722594
15455554
2314176
397343611750
2093311060316074
65109527813884
46708
18423975
499150
2003-042004-05
5743
9769
Cumu upto End of 10th Plan
010407 to 310308
010410 to 310311557976840909
010411 to 310312
412667
86293726
No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification
since 2004-05
65291374575 296361511th Plan
Cumu upto End of 11th Plan
596556 21212860
557439Cummulative up to end of 12th Plan
SN Contents Page
1 Rate of sale of power for the year 2016-17 33-41
RATE OF SALE OF POWER FOR THE YEAR 2016-17
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) NORTHERN REGION
CENTRAL SECTOR
BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 18000 66900 19800
CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 54000 222400 21600
CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 30000 144400 19600
CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 23100 91700 42600
PARBATI - III HPS NHPC LTD HYDRO-HYDRO 52000 68200 54800
DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 28000 95600 30000
CHUTAK NHPC LTD HYDRO-HYDRO 4400 22000 79800
DULHASTI HPS NHPC LTD HYDRO-HYDRO 39000 228000 56400
SALAL HPS NHPC LTD HYDRO-HYDRO 69000 342300 11000
TANAKPUR HPS NHPC LTD HYDRO-HYDRO 9420 43000 29600
URI HPS -I NHPC LTD HYDRO-HYDRO 48000 280300 16000
URI HPS - II NHPC LTD HYDRO-HYDRO 24000 147300 48600
NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 4500 24600 88200
SEWA - II NHPC LTD HYDRO-HYDRO 12000 47100 43400
ANTA CCPP NTPC LTD THERMAL-GASN 41930 67539 32400
AURAIYA CCPP NTPC LTD THERMAL-GASN 66336 53501 39100
BADARPUR TPS NTPC LTD THERMAL-COAL 70500 159153 44800
DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 84000 296170 42300
DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 98000 526686 46300
DADRI CCPP NTPC LTD THERMAL-GASHSD 82978 227469 33000
FARIDABAD CCPP NTPC LTD THERMAL-GASN 43159 115577 30800
RIHAND STPS I NTPC LTD THERMAL-COAL 100000 596766 24500
RIHAND STPS II NTPC LTD THERMAL-COAL 100000 737069 24600
RIHAND STPS III NTPC LTD THERMAL-COAL 100000 706546 30600
SINGRAULI STPS NTPC LTD THERMAL-COAL 200000 1394068 20400
TANDA TPS NTPC LTD THERMAL-COAL 44000 295438 40800
UNCHAHAR TPS I NTPC LTD THERMAL-COAL 42000 256454 39800
UNCHAHAR TPS II NTPC LTD THERMAL-COAL 42000 273577 38900
UNCHAHAR TPS III NTPC LTD THERMAL-COAL 21000 142780 43000
KOLDAM NTPC LTD HYDRO-HYDRO 80000 363260 43600
NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 303575 25841
RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 108000 668677 35374
NJHPS SJVNL HYDRO-HYDRO 150000 699496 23820
RAMPUR HPS SJVNL HYDRO-HYDRO 41202 195982 32260
TEHRI HPP THDC HYDRO-HYDRO 100000 272543 51800
KOTESHWAR HEP THDC HYDRO-HYDRO 40000 106244 53400
IGSTPS JHAJJAR ARAVALI P CPL THERMAL-COAL 150000 510429 49490
NEYVELI BARSINGSAR NEYVELI LIG CORP LTD THERMAL-LIG 25000 127520 38040
STATE SECTOR
PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 21000 14222 48200
PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 21000 19205 48400
PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 25000 102257 42600
PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 25000 62107 41800
DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 60000 312213 41000
RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 120000 35767442200
WYC HYDEL STATION HPGCL HYDRO-HYDRO 6240 20365 24900
GIRI POWER HOUSE HPSEB HYDRO-HYDRO 6000 13958 7600
ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 1695 5467 11900
BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 12000 18528 6700
GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 2250 7462 22500
BASSI POWER HOUSE HPSEB HYDRO-HYDRO 6600 29649 7500
BINWA POWER HOUSE HPSEB HYDRO-HYDRO 600 2749 19300
ANNEXURE-I
RATE OF SALE OF POWER FOR THE YEAR 2016-2017
Page 33
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) GAJ POWER HOUSE HPSEB HYDRO-HYDRO 1050 2914 26700
BANER POWER HOUSE HPSEB HYDRO-HYDRO 1200 2864 16200
HOLI POWER HOUSE HPSEB HYDRO-HYDRO 300 616 22500
THIROT POWER HOUSE HPSEB HYDRO-HYDRO 450 1126 22500
KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 1200 3064 22500
LARJI POWER HOUSE HPSEB HYDRO-HYDRO 12600 53677 23700
NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 250 750 31000
CHABA POWER HOUSE HPSEB HYDRO-HYDRO 175 465 23300
RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 150 101 13400
SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 200 000 22500
KILLAR HPSEB HYDRO-HYDRO 030 050 22500
BHABA AUGUMENP H HPSEB HYDRO-HYDRO 450 1276 22500
BS CHAMBA HPSEB HYDRO-HYDRO 045 099 19500
GUMMA HPSEB HYDRO-HYDRO 300 423 22500
GAS TURBINE POWER STATION IPGCL THERMAL-GAS 27000 67233 39300
PPS-I PPCL THERMAL-GAS 33000 175905 38300
PPS-III PPCL THERMAL-GAS 137120 196879 36100
LOWER JHELUM JampKPDD HYDRO-HYDRO 10500 60214 5100
UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 2260 10514 6300
UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 10500 44202 8500
GANDHARBAL JampKPDD HYDRO-HYDRO 1500 8925 4700
KARNAH MPH JampKPDD HYDRO-HYDRO 200 1122 31000
CHENANI I JampKPDD HYDRO-HYDRO 2330 10892 6600
CHENANI II JampKPDD HYDRO-HYDRO 200 1188 9300
CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 750 3634 14200
IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 375 2108 18500
IGO MERCHELLONG JampKPDD HYDRO-HYDRO 300 1572 29700
PAHALGAM MHP JampKPDD HYDRO-HYDRO 450 1713 32900
MARPACHOO JampKPDD HYDRO-HYDRO 075 375 29800
HAFTAL JampKPDD HYDRO-HYDRO 100 483 28700
SANJAK JampKPDD HYDRO-HYDRO 126 441 36000
SEWA-III JampKPDD HYDRO-HYDRO 900 3273 20200
BHADERWAH JampKPDD HYDRO-HYDRO 150 935 8900
BAZGO JampKPDD HYDRO-HYDRO 030 108 33300
SUMOOR JampKPDD HYDRO-HYDRO 010 045 35400
HUNDER JampKPDD HYDRO-HYDRO 040 176 26200
STAKNA JampKPDD HYDRO-HYDRO 400 1933 4100
KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 124000 662879 31360
SURATGARH TPS RRVUNL THERMAL-COAL 150000 402328 41730
CHHABRA TPS 1amp 2 RRVUNL THERMAL-COAL 50000 305946 36700
CHHABRA TPS 3 RRVUNL THERMAL-COAL 25000 151536 36700
CHHABRA TPS 4 RRVUNL THERMAL-COAL 25000 155896 36700
RAMGARH GT POWER PROJECT RRVUNL THERMAL-COAL 22050 43177 41800
RAMGARH GAS T P PROJECT 3 RRVUNL THERMAL-GAS 5000 93615 41800
DHOLPUR C C POWER PROJECT RRVUNL THERMAL-R-LNG 33000 9486 46110
MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 14000 20855 34192
MINI MICRO HYDEL (MMH) P S RRVUNL HYDRO-HYDRO 2385 851 37800
KALISINDH TPP 1 RRVUNL THERMAL-COAL 60000 341543 45000
KALISINDH TPP 2 RRVUNL THERMAL-COAL 60000 211588 45000
KHARA HEP UPJVNL HYDRO-HYDRO 7200 26654 7200
MATATILLA HEP UPJVNL HYDRO-HYDRO 3060 12219 6500
OBRA HEP UPJVNL HYDRO-HYDRO 9900 21517 6300
RIHAND UPJVNL HYDRO-HYDRO 30000 57369 5500
ANPARA A TPS UPRVUNL THERMAL-COAL 63000 317536 27000
ANPARA B TPS UPRVUNL THERMAL-COAL 100000 705605 22700
ANPARA D UPRVUNL THERMAL-COAL 100000 300158 39800
HARDUAGANJ TPS UPRVUNL THERMAL-COAL 16500 45817 49200
HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 50000 304389 46600
OBRA A TPS UPRVUNL THERMAL-COAL 28800 13158 34000
OBRA B TPS UPRVUNL THERMAL-COAL 100000 328124 21900
Page 34
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) PANKI TPS UPRVUNL THERMAL-COAL 21000 66488 50300
PARICHHA TPS UPRVUNL THERMAL-COAL 22000 38762 49400
PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 42000 231931 45600
PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 50000 276722 50400
CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 24000 70845 8290
CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 14400 75366 8390
DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 3375 9595 12080
DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 5100 18701 10520
KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4140 17359 12330
KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 12000 33001 9420
KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 3000 11953 8320
TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 9000 33983 12460
MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 30400 124510 16110
RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 19800 17897 10550
MPUR UTTARAKHAND JVNL HYDRO-HYDRO 930 5121 19200
PATHRI UTTARAKHAND JVNL HYDRO-HYDRO 2040 11636 14200
GALOGI UTTARAKHAND JVNL HYDRO-HYDRO 300 648 12500
PRIVATE SECTOR
MGTPP CLP INDIA PVT LTD THERMAL-COAL 132000 268902 41940
SHRINAGAR HEP ALAKNANDA HPCL HYDRO-HYDRO 33000 127414 48800
GAMA INFRAPROP CCPP GAMA INFRAPROP PVT THERMAL-GAS 22500 52686 47000
PPGCL (BARA) JP POWER VENTURES LTD THERMAL-COAL 198000 448200 38500
MALANA HEP MALANA PCL HYDRO-HYDRO 8600 26354 29792
MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 10000 30369 32580
ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 19200 56347 36079
KASHANG HEP H P PCL HYDRO-HYDRO 19500 5034 29200
BASPA-II HEP HBPCL HYDRO-HYDRO 30000 132769 13600
KARCHAM WANGTOO HEP HBPCL HYDRO-HYDRO 100000 434386 36600
RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 108000 582600 43700
RITHALA COMBI CY POWER PLANT TATA POWER DDL THERMAL-GAS 9480 000 11900
RAJPURA TPS NABHA POWER LTD THERMAL-GAS 140000 901484 39000
TALWANDI SABO POWER LTD TALWANDI SABO POWER LTD THERMAL-COAL 198000 636040 49548
ROJA THERMAL POWER STATION ROJA POWER SCL THERMAL-COAL 120000 727200 43400
KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 34400 63400
BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 36000 62600
MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 38200 60800
UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 37900 61500
KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 42300 58800
LALITPUR PGCL BAJAJ ENERGY PVT LTD THERMAL-COAL 198000 359400 47300
PRAYAGRAJ PGCL PRAYAGRAJ PGCL THERMAL-COAL 132000 448200 38595
KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 132000 783182 33438
WESTERN REGION
CENTRAL SECTOR
INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 100000 325333 23892
OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 52000 141663 34001
GANDHAR CCPP NTPC LTD THERMAL-GAS 65739 221924 28700
KAWAS CCPP NTPC LTD THERMAL-GASN 65620 167929 27000
KORBA I amp II NTPC LTD THERMAL-COAL 210000 1499171 20500
KORBA III NTPC LTD THERMAL-COAL 50000 358746 26600
SIPAT STPS I NTPC LTD THERMAL-COAL 198000 1479902 26800
SIPAT STPS II NTPC LTD THERMAL-COAL 100000 766549 26500
VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 126000 693142 25800
VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 100000 608781 23800
VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 100000 673475 27600
VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 100000 655924 32900
VINDHYACHAL STPS V NTPC LTD THERMAL-COAL 50000 328265 31700
MOUDA I NTPC LTD THERMAL-COAL 100000 343130 44500
MOUDA Ii NTPC LTD THERMAL-COAL 66000 40637 39900
RATNAGIRI GAS amp POWER PVT LTD RGPPL THERMAL-GAS 196708 442485 47000
KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 000 24729
TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 32000 201227 10740
Page 35
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 365122 19069
TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 787444 29324
STATE SECTOR
GSEG-HAZIRA15610 MW GUJARAT S ENEGEN LTD THERMAL-GAS 15610 1805 28200
GSEG-HAZIRA35143 MW GUJARAT S ENEGEN LTD THERMAL-GAS 35130 22276 51300
GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 21978 51800
AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 13929 26100
KORBA TPS EAST CSPGCL THERMAL-COAL 44000 198673 33880
DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 365808 27570
KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 316500 30420
HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 532878 19410
CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 515 58300
MTTPS CHAMPA U-I CSPGCL THERMAL-COAL 50000 220376 39000
MTTPS CHAMPA U-II CSPGCL THERMAL-COAL 50000 23709 10000
SHP GANGREL CSPGCL HYDRO-HYDRO 1000 2350 36790
BANGO HEP CSPGCL HYDRO-HYDRO 12000 14662 8900
MHP KORBA WEST CSPGCL HYDRO-HYDRO 170 859 38190
SIKASAR HEP CSPGCL HYDRO-HYDRO 700 418 26870
DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8843 74500
DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 19446 51500
GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 66388 71600
GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127488 41300
KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 96072 43900
KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 29841 56400
SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 184966 58800
UKAI 1-5 GSECL THERMAL-COAL 85000 204891 46900
UKAI TPS 6 GSECL THERMAL-COAL 50000 284448 48200
WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 271999 58300
WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 82808 44100
KADANA HPS GSECL HYDRO-HYDRO 24200 34433 16800
UKAI HPS GSECL HYDRO-HYDRO 30500 40585 6100
TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 123000 11500
BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 8900 10900
BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 7200 27500
JHINNA HPS MPPGCL HYDRO-HYDRO 2000 9700 18500
RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 44300 3400
GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 17300 4600
SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 4100 16900
MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 14600 27000
PENCH HPS MPPGCL HYDRO-HYDRO 16000 23700 8100
RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 3000 16900
AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 134400 35100
SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 283800 38700
SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 344600 34300
SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 111600 61600
SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 211800 58000
SSTPS PH-I MPPGCL THERMAL-COAL 120000 233100 84300
BHUSAWAL TPS MSPGCL THERMAL-COAL 142000 566258 51100
CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1365682 33700
KHAPERKHEDA MSPGCL THERMAL-COAL 134000 706207 39100
KORADI TPS MSPGCL THERMAL-COAL 62000 443206 42000
NASIK TPS MSPGCL THERMAL-COAL 63000 297275 47000
PARLI TPS MSPGCL THERMAL-COAL 113000 175934 71600
PARAS MSPGCL THERMAL-COAL 50000 267931 38700
URAN CCPP MSPGCL THERMAL-GAS 67200 320330 30600
KOYANA MSPGCL HYDRO-HYDRO 195600 328155 13100
SMALL HYDRO POWER PLANTS MSPGCL HYDRO-HYDRO 45400 93062 30500
BHIRA MSPGCL HYDRO-HYDRO 8000 10046 8400
TILLARI MSPGCL HYDRO-HYDRO 8900 10584 3100
SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 233298 20500
SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 87633 20500
PRIVATE SECTOR
Page 36
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 81282 46750
JNSTPP(JAYPEE NIGRIE) JP POWER VENTURES LTD THERMAL-COAL 132000 726695 29310
MB POWER MB POWER THERMAL-COAL 120000 345632 38310
ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 754922 28671
ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 780761 23495
ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 198000 1263784 32090
ADANI POWER MAHARA ADANI POWER LTD THERMAL-COAL 330000 1666191 34124
AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 170065 36827
SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 252035 45129
ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 458551 36000
ESSAR POWER MP LTD ESSAR POWER MP LTD THERMAL-COAL 60000 243040 28600
VEDANTA LTD (P P -I) VEDANTA LTD THERMAL-GAS 3000 15044 24000
VEDANTA LTD (P P -II) VEDANTA LTD THERMAL-GAS 3000 21293 24000
PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 8234600 24000
165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 5850 64390
145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 68717 40349
SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 132655 28776
SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 144686 38567
MUNDRA UMPPCOASTAL GUJARAT POWER
LTD THERMAL-IMP COAL 400000 2530300
23900
LANCO AMARKANTAK TPP PATHADIH
U-ILANCO AMARKAN POWER LTD THERMAL-COAL 30000 195500
29200
LANCO AMARKANTAK TPP PATHADIH
U-IILANCO AMARKAN POWER LTD THERMAL-COAL 30000 206900
27600
BARADARHA TPS D B POWER LTD THERMAL-COAL 120000 677373 29200
JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 405000 28900
JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 453000 40500
DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 339437 40700
TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 293400 44000
TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 137200 37000
TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 174900 44000
BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 92900 14100
BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23700 34300
KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 27600 48300
CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2530300 23900
BHANDARDRA HEP -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 2475 54900
SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 161400 26500
SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 445000 39000
SOTHERN REGION
CENTRAL SECTOR
NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 325699 54820
NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 305532 39880
NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 998805 38510
NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 113016 54070
NEYVELI TAMILNADU POWER LTD JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 625274 42200
VALLUR TPS NTPC TECL THERMAL-COAL 150000 856438 42350
R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 1493 84300
RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1502919 29400
RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 341291 31800
SIMHADRI I NTPC LTD THERMAL-COAL 100000 688382 36800
SIMHADRI II NTPC LTD THERMAL-COAL 100000 663657 43400
KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 593110 31324
MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 291625 21764
KKNPP-1 amp 2 NPCIL NUCLEAR-NUCLEAR 200000 572609 40948
MINICOY LAKSHADEEP THERMAL-DIESEL 340 770 29600
KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1097 29600
AMINI LAKSHADEEP THERMAL-DIESEL 265 509 29600
ANDROTT LAKSHADEEP THERMAL-DIESEL 219 524 29600
KALPENI LAKSHADEEP THERMAL-DIESEL 175 356 29600
AGATTI LAKSHADEEP THERMAL-DIESEL 195 658 29600
KADMAT LAKSHADEEP THERMAL-DIESEL 190 414 29600
KILTAN LAKSHADEEP THERMAL-DIESEL 150 269 29600
CHETLET LAKSHADEEP THERMAL-DIESEL 100 139 29600
BITRA LAKSHADEEP THERMAL-DIESEL 043 024 29600
BANGARAM LAKSHADEEP THERMAL-DIESEL 018 009 29600
Page 37
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) STATE SECTOR
Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 721811 46500
Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 50000 336142 46500
RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 237358 46500
RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 239926 46500
RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 124500 46500
SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 62109 46500
UPPER SILERU APGENCO HYDRO-HYDRO 24000 33000 46500
LOWER SILERU APGENCO HYDRO-HYDRO 46000 81066 46500
DONKARAI APGENCO HYDRO-HYDRO 2500 6007 46500
PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 1262 46500
CHETTIPETA APGENCO HYDRO-HYDRO 100 214 46500
MUCHKUND APGENCO HYDRO-HYDRO 12000 37571 46500
NAGARJUNASAGAR RCPH APGENCO HYDRO-HYDRO 9000 606 46500
TUNGABHADRA HES amp HAMPI(AP
Share)
APGENCO HYDRO-HYDRO 7200 6100 46500
KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 352232 42600
KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 288131 32500
KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 319272 46500
RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 40073 44300
KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 308317 46000
KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 308963 51300
SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 61004 76600
NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 17960 75300
PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 20873 58300
POCHAMPAD-I TSPGENCO HYDRO-HYDRO 2700 5455 29800
POCHAMPAD-II TSPGENCO HYDRO-HYDRO 900 1932 40700
NIZAMSAGAR TSPGENCO HYDRO-HYDRO 1000 1126 53400
RAICHUR TPS 1 to 7 KPCL THERMAL-COAL 147000 890866 43800
RAICHUR TPS 8 KPCL THERMAL-COAL 25000 159523 48200
BELLARI TPS 1 KPCL THERMAL-COAL 50000 318679 51100
BELLARI TPS 2 KPCL THERMAL-COAL 50000 232347 55600
BELLARI TPS 3 KPCL THERMAL-COAL 70000 47565 34400
BHADRA PH KPCL HYDRO-HYDRO 3920 2369 45900
GERUSUPPA PH KPCL HYDRO-HYDRO 24000 26990 22000
GHAT PRABHA HEP KPCL HYDRO-HYDRO 3200 4777 25300
KADRA HPS KPCL HYDRO-HYDRO 15000 16889 26800
NAGJHARI KPCL HYDRO-HYDRO 90000 155159 9800
KODASALLI DPH KPCL HYDRO-HYDRO 12000 14854 19200
MUNIRA+MGH+SPH+SPH KPCL HYDRO-HYDRO 22640 48211 7900
SHARAVATHY HPS KPCL HYDRO-HYDRO 108550 276215 5400
ALMATTI DPH KPCL HYDRO-HYDRO 29000 39611 24600
VARAHI UGPH KPCL HYDRO-HYDRO 46000 71368 15600
IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 17196 15300
IDUKKI HPS KSEB HYDRO-HYDRO 78000 137905 15300
KAKKAD HPS KSEB HYDRO-HYDRO 5000 13063 15300
KALLADA HPS KSEB HYDRO-HYDRO 1500 4436 15300
KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 46544 15300
KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 635 15300
LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 30822 15300
MALANKARA HPS KSEB HYDRO-HYDRO 1050 2474 15300
MATTUPETTY KSEB HYDRO-HYDRO 200 230 15300
MALAMPUZHA KSEB HYDRO-HYDRO 250 063 15300
CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 864 15300
URUMI ST I amp II KSEB HYDRO-HYDRO 615 903 15300
LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 248 15300
NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7765 19625 15300
PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 16601 15300
PANNIAR HPS KSEB HYDRO-HYDRO 3240 6217 15300
PORINGALKUTHU KSEB HYDRO-HYDRO 3600 10052 15300
PORINGALKUTHU LBE KSEB HYDRO-HYDRO 1600 9438 15300
PEPPARA KSEB HYDRO-HYDRO 300 395 15300
POOZHITHODE KSEB HYDRO-HYDRO 480 1045 15300
Page 38
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) PEECHI KSEB HYDRO-HYDRO 125 040 15300
RANI-PERUNADU KSEB HYDRO-HYDRO 400 585 15300
SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 79783 15300
SENGULAM HPS KSEB HYDRO-HYDRO 5120 11558 15300
SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 16711 15300
VILANGAD KSEB HYDRO-HYDRO 750 1578 15300
BARAPOLE KSEB HYDRO-HYDRO 1500 1932 15300
VELLATHOOVAL KSEB HYDRO-HYDRO 360 305 15300
CHIM0NY KSEB HYDRO-HYDRO 250 156 15300
ADYANPARA KSEB HYDRO-HYDRO 350 501 15300
BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 554 15300
KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 3801 15300
KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 23132 32800
ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 14416 62280
METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 523970 62280
METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 321270 62280
NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 336575 62280
NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 591240 62280
TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 508966 62280
KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 30897 62280
VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 18720 90699 62280
KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 33593 62280
BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 1047 62280
PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 1250 62280
PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 330 62280
MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 4897 62280
MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 032 62280
KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15681 62280
KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 40608 62280
KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 21342 62280
KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 4717 62280
KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4322 62280
KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2399 62280
METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 4416 62280
METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 8035 62280
BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2187 62280
BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2359 62280
BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2511 62280
BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 1949 62280
BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 1819 62280
POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 172 62280
SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 241 62280
MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 026 62280
THIRUMOORTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 136 62280
PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 9309 62280
VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 353 62280
SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 4192 62280
PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 6571 62280
SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 1186 62280
SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6319 62280
ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 6122 62280
KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 28674 62280
SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 18381 62280
SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 4258 62280
KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 12680 62280
KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4201 62280
ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 000 62280
PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 19175 62280
AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 078 62280
BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 504 62280
BHAVANI KATTALAI (BKB)(IIIampIII BB I amp II)TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 5847 62280
PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 000 62280
Page 39
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) SRI DAMODARAM STPS APPDCL THERMAL-COAL 160000 808108 36300
PRIVATE SECTOR
KARUPPUR TANJORE LANCO TANJORE PCL THERMAL-GAS 12000 48096 28770
SIMHAPURI ENERGY LTD SIMHAPURI ENERGY LTD THERMAL-COAL 60000 143900 39100
JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 7111 45500
SBU 1 JSW ENERGY LTD
VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 26000 159100
43300
SBU 2 JSW ENERGY LTD
VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 60000 247900
42800
LANCO KPLLANCO KONDAPALLI POWER
LTDTHERMAL-GAS 36814 85060
25776
LANCO KPL STG -IILANCO KONDAPALLI POWER
LTDTHERMAL-GAS 36600 12979
46330
LANCO KPL STG -IIIALANCO KONDAPALLI POWER
LTDTHERMAL-GAS 37100 85710
46330
LANCO KPL STG -III BLANCO KONDAPALLI POWER
LTDTHERMAL-GAS 37100 43639
46330
HINDUJA NATIONAL PCL HINDUJA NATIONAL PCL THERMAL-COAL 104000 303000 38200
MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 121164 49940
UDUPI POWER COR LTD ADANI POWER LTD THERMAL-COAL 120000 754613 42500
SPECTRUM POWER GENERATION
LTD SPECTRUM PG LTD THERMAL-GASN 20525 9256812
34952
TAQA NEYVELI POWER COM PVT
LTD TAQA NEYVELI THERMAL-LIG 25000 5840
34500
ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 251000 51000
ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 207860 36800
GMR VEMAGIRI POWER GENERATION
LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 30117
46450
EASTERN REGION
CENTRAL SECTOR
MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 64675 53113
MTPS STAGE - II KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 39000 1432 69138
BOKARO `B` TPS DVC THERMAL-COAL 63000 145670 31539
MEJIA TPS U 1-3 DVC THERMAL-COAL 63000 348298 31552
MEJIA TPS U 4 DVC THERMAL-COAL 21000 116099 34997
MEJIA TPS U 5-6 DVC THERMAL-COAL 50000 276427 35976
MEJIA TPS U 7-8 DVC THERMAL-COAL 100000 552854 36991
DURGAPUR STEEL TPS DVC THERMAL-COAL 100000 665550 39323
DURGAPUR TPS DVC THERMAL-COAL 21000 59270 35416
RAGHUNATHPUR TPS DVC THERMAL-COAL 120000 201650 35326
MAITHON HYDEL STA DVC HYDRO-HYDRO 6320 12200 17984
CHANDRAPURA TPSU1-3 DVC THERMAL-COAL 42000 257610 35095
CHANDRAPURA TPSU7-8 DVC THERMAL-COAL 50000 306673 34987
KODERMA TPS DVC THERMAL-COAL 100000 380180 38131
PANCHET HPS DVC HYDRO-HYDRO 8000 13360 17984
TILLAYA HPS DVC HYDRO-HYDRO 400 1410 17984
RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34700 35400
TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 277300 23200
TLDP -III NHPC LTD HYDRO-HYDRO 13200 55400 62000
TLDP -IV NHPC LTD HYDRO-HYDRO 16000 60300 25600
FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 957219 33700
FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 308943 41000
BONGAINGAON TPS NTPC LTD THERMAL-COAL 25000 153663 58600
KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 542277 34200
KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 942591 34200
BARH-II NTPC LTD THERMAL-COAL 132000 728021 44500
TALCHER TPS NTPC LTD THERMAL-COAL 46000 335521 30100
TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 702319 25600
TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1436521 24700
STATE SECTOR
BTPS(RampM) BIHAR STATE PGCL THERMAL-COAL 22000 12142 39700
BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 98331 10602
HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 50593 9482
CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 19689 2605
RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 53192 6033
UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 147208 14637
Page 40
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 60353 4519
IB TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 288567 25000
J P H GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 210 038 61100
MEYONG CHU GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 400 1086 61100
TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 122667 38200
DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 214339 43321
KOLAGHAT THERMAL POWER
STATION
WEST BENGAL PDCL THERMAL-COAL 126000 538269 31603
BAKRESHWAR THERMAL POWER
PLANT
WEST BENGAL PDCL THERMAL-COAL 105000 634876 32154
BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 45000 166855 33299
SANTHALDIH THERMAL POWER
STATION
WEST BENGAL PDCL THERMAL-COAL 50000 336442 34932
SAGARDIGHI THERMAL POWER
PROJECT
WEST BENGAL PDCL THERMAL-COAL 160000 423121 34705
JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 20344 68900
RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 24559 68900
TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 4623 68900
PURULIA PUMPED STORAGE
PROJECT
WEST BENGAL SEDCL HYDRO-HYDRO 90000 108816 68900
MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2768 68900
PRIVATE SECTOR
CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 49474 20230
CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 555500 70200
HALDIA ENERGY HALDIA ENERGY LTD THERMAL-COAL 60000 371000 50400
DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3688 63400
KAMALANGA TPS GMR KAMALANGA ENERGY LTD THERMAL-COAL 105000547670
33300
ADHUNIK POWER U-1 ADHUNIK POWER THERMAL-COAL 27000 158 44060
ADHUNIK POWER U-2 ADHUNIK POWER THERMAL-COAL 27000 168 44250
VL-JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 332800 23622
JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 43000 45250
JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 71700 37030
JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 70700 35920
JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 71100 38870
JOJOBERA UNIT 5 TATA POWER COM LTD THERMAL-COAL 12000 79300 44560
JOJOBERA UNIT 6 TATA POWER COM LTD THERMAL-WHR 12000 83700 12840
IEL KALINGANAGAR U-I TATA POWER COM LTD THERMAL-WG 6750 33400 22500
IEL KALINGANAGAR U-II TATA POWER COM LTD THERMAL-WG 6750 34800 22500
MAITHON UNIT 1 amp 2 TATA POWER COM LTD THERMAL-COAL 105000 678000 36100
HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 27500 24340
HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 28400 24340
HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 15800 24310
NORTH EASTERN REGION
CENTRAL SECTOR
LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 74100 36600
AGARTALA GT NEEPCO THERMAL-GAS 13500 88611 27210
ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 153111 32310
DOYANG HEP NEEPCO HYDRO-HYDRO 7500 25598 49801
KOPILI HEP NEEPCO HYDRO-HYDRO 20000 98186 11491
KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 19582 20237
KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 10310 17968
RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 124093 22945
TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 10100 17344 39000
STATE SECTOR
HYDRO POWER (122 Stns) ITANAGAR GOVT OF ARUNACHAL
PRADESHHYDRO-HYDRO 6971 6217270
24600
KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39514 17337
LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 82327 36810
NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 33318 48290
MYNTRIANG SHEP ST II ASSAM POWER GENCO HYDRO-HYDRO 300 567 35776
LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 9130 49200
LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 012 49200
DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 022 49200
TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 000 49200
UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 4990 16000
UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 6476 37000
UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 16494 14600
UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 3600 9556 15000
SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 758 8000
MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44070 44800
KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 154 41400
TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 091 41400
MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 411 41400
MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 394 41400
KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 760 41400
SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 3264 41400
LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 044 41400
BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 18953 28000
ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 43585 28200
GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 4080 11100
Note
LIG Lignite N Naptha WHR Waste Heat Recovery
Page 41
आकड़ मममलयन यननट नट Figures in MU net
ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied
कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )
चडीगढ़ Chandigarh 117 117 0 00 117 117 0 00
दिलली Delhi 2698 2698 1 00 2698 2698 1 00
हरियजणज Haryana 3773 3773 0 00 3773 3773 0 00
दहमजचल परिश Himachal Pradesh 777 777 0 00 777 777 0 00
रमम कशमीि Jammu amp Kashmir 1604 1296 308 192 1604 1296 308 192
परजब Punjab 3646 3646 0 00 3646 3646 0 00
िजरसथजन Rajasthan 6210 6208 2 00 6210 6208 2 00
उतति परिश Uttar Pradesh 10179 10148 32 03 10179 10148 32 03
उततिजखड Uttarakhand 1120 1120 0 00 1120 1120 0 00
उततरी कषतर Northern Region 30094 29786 308 10 30094 29786 308 10
छततीसगढ़ Chhattisgarh 2684 2676 8 03 2684 2676 8 03
गरिजत Gujarat 10718 10718 0 00 10718 10718 0 00
मधय परिश Madhya Pradesh 6006 6006 0 00 6006 6006 0 00
महजिजषटर Maharashtra 14308 14308 0 00 14308 14308 0 00
िमन औि दिउ Daman amp Diu 220 220 0 00 220 220 0 00
िजिि व नगि हवली Dadra amp Nagar Haveli 552 552 0 00 552 552 0 00
गोवज Goa 388 388 0 00 388 388 0 00
पशचिमी कषतर Western Region 34875 34868 8 00 34875 34868 8 00
आनधर परिश Andhra Pradesh 5708 5708 0 00 5708 5708 0 00
तलगजनज Telangana 5725 5725 0 00 5725 5725 0 00
कनजाटक Karnataka 7003 7003 0 00 7003 7003 0 00
किल Kerala 2402 2400 2 01 2402 2400 2 01
तममल नजड Tamil Nadu 10010 10010 0 00 10010 10010 0 00
पडचिी Puducherry 263 263 0 00 263 263 0 00
लकष-दवीप Lakshadweep 4 4 0 0 4 4 0 0
दकषकषणी कषतर Southern Region 31111 31109 2 00 31111 31109 2 00
बबहजि Bihar 2589 2589 0 00 2589 2589 0 00
िजमोिि घजटी ननगम DVC 1772 1772 0 00 1772 1772 0 00
झजिखणड Jharkhand 689 689 0 00 689 689 0 00
ओडडशज Odisha 2689 2689 1 00 2689 2689 1 00
पशशचम बगजल West Bengal 5075 5075 0 00 5075 5075 0 00
मसशककम Sikkim 37 37 0 00 37 37 0 00
अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 7 29 27 2 7
परवी कषतर Eastern Region 12851 12850 1 00 12851 12850 1 00
अरणजचल परिश Arunachal Pradesh 66 66 0 05 66 66 0 05
असम Assam 766 709 57 75 766 709 57 75
मणणपि Manipur 68 67 1 15 68 67 1 15
मघजलय Meghalaya 170 160 10 59 170 160 10 59
ममज़ोिम Mizoram 54 53 0 08 54 53 0 08
नजगजलड Nagaland 54 54 0 08 54 54 0 08
बिपिज Tripura 122 120 1 12 122 120 1 12
उततर-परवी कषतर North-Eastern Region 1300 1228 71 55 1300 1228 71 55
समपणण भारत All India 110231 109842 389 04 110231 109842 389 04
23
ऊरजा पनत ा म कमी ऊरजा पनत ा म कमीEnergy not Supplied
Excludes energy exported to Bangladesh
Energy not Supplied
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
ऊराण वरवदयत आपरत ण शथिरत ररपोरण (परवाणरवलोकन) Energy Power Supply Position Report (Provisional)
राजयState
अपरल 2019 April2019 अपरल2019 -अपरल2019 April2019 to April2019
अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met
कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )
चडीगढ़ Chandigarh 256 256 0 00 256 256 0 00
दिलली Delhi 5664 5664 0 00 5664 5664 0 00
हरियजणज Haryana 8127 8127 0 00 8127 8127 0 00
दहमजचल परिश Himachal Pradesh 1387 1387 0 00 1387 1387 0 00
रमम कशमीि Jammu amp Kashmir 2826 2261 565 200 2826 2261 565 200
परजब Punjab 7015 7015 0 00 7015 7015 0 00
िजरसथजन Rajasthan 10560 10560 0 00 10560 10560 0 00
उतति परिश Uttar Pradesh 19935 19935 0 00 19935 19935 0 00
उततिजखड Uttarakhand 1922 1922 0 00 1922 1922 0 00
उततरी कषतर Northern Region 54476 53985 491 09 54476 53985 491 09
छततीसगढ़ Chhattisgarh 4596 4574 22 05 4596 4574 22 05
गरिजत Gujarat 17871 17865 6 00 17871 17865 6 00
मधय परिश Madhya Pradesh 10018 10018 0 00 10018 10018 0 00
महजिजषटर Maharashtra 23158 23150 8 00 23158 23150 8 00
िमन औि दिउ Daman amp Diu 341 340 1 02 341 340 1 02
िजिि व नगि हवली Dadra amp Nagar Haveli 818 818 0 00 818 818 0 00
गोवज Goa 594 594 0 00 594 594 0 00
पशचिमी कषतर Western Region 56242 56222 20 00 56242 56222 20 00
आनधर परिश Andhra Pradesh 9151 9151 0 00 9151 9151 0 00
तलगजनज Telangana 10191 10191 0 00 10191 10191 0 00
कनजाटक Karnataka 12681 12681 0 00 12681 12681 0 00
किल Kerala 4309 4300 8 02 4309 4300 8 02
तममल नजड Tamil Nadu 15972 15972 0 00 15972 15972 0 00
पडचिी Puducherry 482 480 2 05 482 480 2 05
लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0
दकषकषणी कषतर Southern Region 49155 49103 52 01 49155 49103 52 01
बबहजि Bihar 5357 5357 0 00 5357 5357 0 00
िजमोिि घजटी ननगम DVC 3039 3039 0 00 3039 3039 0 00
झजिखणड Jharkhand 1266 1266 0 00 1266 1266 0 00
ओडडशज Odisha 5389 5389 0 00 5389 5389 0 00
पशशचम बगजल West Bengal 8666 8666 0 00 8666 8666 0 00
मसशककम Sikkim 100 100 0 00 100 100 0 00
अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7
परवी कषतर Eastern Region 23349 23349 0 00 23349 23349 0 00
अरणजचल परिश Arunachal Pradesh 139 136 3 22 139 136 3 22
असम Assam 1712 1667 45 26 1712 1667 45 26
मणणपि Manipur 197 188 9 46 197 188 9 46
मघजलय Meghalaya 336 336 0 00 336 336 0 00
ममज़ोिम Mizoram 116 113 3 26 116 113 3 26
नजगजलड Nagaland 157 131 26 166 157 131 26 166
बिपिज Tripura 292 291 1 03 292 291 1 03
उततर-परवी कषतर North-Eastern Region 2848 2780 68 24 2848 2780 68 24
समपणण भारत All India 177411 176810 601 03 177411 176810 601 03
24
मजग की पनत ा म कमी Demand not Met
Excludes the supply to Bangladesh
राजयStateअपरल 2019 April2019
मजग की पनत ा म कमी Demand not Met
अधिकतम वरवदयत आपरत ण शथिरत ररपोरण (परवाणरवलोकन) Peak Power Supply Position Report (Provisional)
आकड़ मगज वजट नट Figures in MW netअपरल2019 -अपरल2019 April2019 to April2019
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
आकड़ मममलयन यननट नट Figures in MU net
ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied
कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )
चडीगढ़ Chandigarh 96 96 0 00 1561 1561 0 00
दिलली Delhi 1931 1930 1 00 32299 32282 17 01
हरियजणज Haryana 3658 3658 0 00 53665 53665 0 00
दहमजचल परिश Himachal Pradesh 832 830 2 02 9850 9618 232 24
रमम कशमीि Jammu amp Kashmir 1767 1414 353 200 19593 15868 3725 190
परजब Punjab 3585 3585 0 00 55288 55275 13 00
िजरसथजन Rajasthan 6774 6770 4 01 79826 79637 189 02
उतति परिश Uttar Pradesh 8754 8691 63 07 117101 116118 984 08
उततिजखड Uttarakhand 1067 1067 0 00 13845 13753 92 07
उततरी कषतर Northern Region 28464 28041 423 15 383028 377776 5251 14
छततीसगढ़ Chhattisgarh 2464 2457 8 03 26130 26076 54 02
गरिजत Gujarat 9890 9890 0 00 116588 116572 15 00
मधय परिश Madhya Pradesh 6236 6236 0 00 75667 75665 2 00
महजिजषटर Maharashtra 13631 13631 0 00 158285 158148 137 01
िमन औि दिउ Daman amp Diu 221 221 0 00 2557 2557 0 00
िजिि व नगि हवली Dadra amp Nagar Haveli 553 553 0 00 6317 6317 0 00
गोवज Goa 362 362 0 00 4283 4280 3 01
पशचिमी कषतर Western Region 33357 33349 8 00 389827 389615 212 01
आनधर परिश Andhra Pradesh 6072 6071 1 00 63735 63677 58 01
तलगजनज Telangana 6930 6929 1 00 66697 66635 62 01
कनजाटक Karnataka 7614 7612 1 00 71759 71690 69 01
किल Kerala 2489 2488 1 00 25029 24911 118 05
तममल नजड Tamil Nadu 10247 10245 2 00 109375 109273 102 01
पडचिी Puducherry 252 251 1 04 2761 2751 10 03
लकष-दवीप Lakshadweep 4 4 0 0 46 46 0 0
दकषकषणी कषतर Southern Region 33605 33597 8 00 339355 338938 417 01
बबहजि Bihar 2319 2318 1 00 30052 29827 225 07
िजमोिि घजटी ननगम DVC 1773 1772 1 00 22365 21995 369 17
झजिखणड Jharkhand 698 697 1 01 8682 8461 221 25
ओडडशज Odisha 2583 2582 1 00 31810 31781 30 01
पशशचम बगजल West Bengal 4585 4584 2 00 52237 52078 159 03
मसशककम Sikkim 41 41 0 00 513 512 0 01
अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 67 346 323 23 67
परवी कषतर Eastern Region 11999 11995 5 00 145658 144654 1004 07
अरणजचल परिश Arunachal Pradesh 61 60 0 06 864 855 9 10
असम Assam 680 656 23 34 9532 9204 328 34
मणणपि Manipur 68 68 1 09 916 906 10 11
मघजलय Meghalaya 173 173 0 03 1955 1953 1 01
ममज़ोिम Mizoram 50 49 0 09 668 661 8 12
नजगजलड Nagaland 58 57 1 20 902 809 93 103
बिपिज Tripura 150 150 0 00 1859 1837 21 11
उततर-परवी कषतर North-Eastern Region 1240 1214 26 21 16696 16225 471 28
समपणण भारत All India 108665 108196 469 04 1274564 1267209 7355 06
Note The revised data for March 2019 is not avaliable
Excludes energy exported to Bangladesh
राजयState
ऊराण वरवदयत आपरत ण शथिरत ररपोरण (परवाणरवलोकन) Energy Power Supply Position Report (Provisional)
25
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
Energy not Supplied Energy not Supplied
मािण2019 March2019 अपरल2018 -मािण2019 April2018 to March2019
ऊरजा पनत ा म कमी ऊरजा पनत ा म कमी
अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met
कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )
चडीगढ़ Chandigarh 223 223 0 00 369 369 0 00
दिलली Delhi 4016 4016 0 00 7016 7016 0 00
हरियजणज Haryana 6544 6544 0 00 10270 10270 0 00
दहमजचल परिश Himachal Pradesh 1683 1683 0 00 1700 1700 0 00
रमम कशमीि Jammu amp Kashmir 3277 2622 655 200 3277 2622 655 200
परजब Punjab 6564 6564 0 00 12638 12638 0 00
िजरसथजन Rajasthan 11885 11885 0 00 13276 13276 0 00
उतति परिश Uttar Pradesh 16220 16220 0 00 20498 20062 436 21
उततिजखड Uttarakhand 2002 2002 0 00 2216 2216 0 00
उततरी कषतर Northern Region 47925 47356 569 12 63166 61726 1440 23
छततीसगढ़ Chhattisgarh 4444 4128 316 71 4444 4270 174 39
गरिजत Gujarat 16263 16263 0 00 17053 16963 90 05
मधय परिश Madhya Pradesh 12328 12323 5 00 13815 13815 0 00
महजिजषटर Maharashtra 22361 22291 70 03 23864 23254 610 26
िमन औि दिउ Daman amp Diu 336 336 0 01 357 356 1 02
िजिि व नगि हवली Dadra amp Nagar Haveli 800 799 1 01 816 815 1 01
गोवज Goa 538 538 0 00 596 596 0 00
पशचिमी कषतर Western Region 53132 52965 167 03 56675 55821 853 15
आनधर परिश Andhra Pradesh 8977 8977 0 00 9459 9453 6 01
तलगजनज Telangana 10471 10471 0 00 10815 10815 0 00
कनजाटक Karnataka 12841 12841 0 00 12841 12841 0 00
किल Kerala 4264 4228 36 09 4264 4228 36 09
तममल नजड Tamil Nadu 15712 15712 0 00 15712 15712 0 00
पडचिी Puducherry 427 412 15 34 427 412 15 34
लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0
दकषकषणी कषतर Southern Region 49464 49464 0 00 49464 49464 0 00
बबहजि Bihar 4633 4633 0 00 5115 5084 31 06
िजमोिि घजटी ननगम DVC 3035 3035 0 00 3035 3035 0 00
झजिखणड Jharkhand 1210 1210 0 00 1339 1291 48 36
ओडडशज Odisha 4827 4827 0 00 5357 5357 0 00
पशशचम बगजल West Bengal 8287 8287 0 00 9130 9123 7 01
मसशककम Sikkim 100 100 0 00 106 106 0 00
अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7
परवी कषतर Eastern Region 21658 21658 0 00 23141 22733 408 18
अरणजचल परिश Arunachal Pradesh 133 131 2 15 138 138 0 01
असम Assam 1539 1508 31 20 1865 1809 56 30
मणणपि Manipur 204 199 5 25 219 216 3 12
मघजलय Meghalaya 357 357 0 00 374 372 1 04
ममज़ोिम Mizoram 108 105 3 28 121 119 2 17
नजगजलड Nagaland 127 125 2 16 156 138 18 116
बिपिज Tripura 249 249 0 00 298 293 5 17
उततर-परवी कषतर North-Eastern Region 2540 2535 5 02 2967 2850 117 39
समपणण भारत All India 169464 168745 719 04 177022 175528 1494 08
Note The revised data for March 2019 is not avaliable 26
अधिकतम वरवदयत आपरत ण शथिरत ररपोरण (परवाणरवलोकन) Peak Power Supply Position Report (Provisional)
आकड़ मगज वजट नट Figures in MW net
राजयStateमािण2019 March2019 अपरल2018 -मािण2019 April2018 to March2019
मजग की पनत ा म कमी मजग की पनत ा म कमी Demand not MetDemand not Met
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
Excludes the supply to Bangladesh
अपरल 2019 April2019 अपरल2018 -मािण2019 April2019 to April2019
उततरी कषतर Northern Region
चडीगढ़ Chandigarh(Data Not Received)दिलली Delhi
हरियजणज Haryana
दहमजचल परिश Himachal Pradeshरमम कशमीि Jammu amp Kashmir(Data
Not Received)परजब Punjab
िजरसथजन Rajasthanउतति परिश Uttar Pradesh
उततिजखड Uttarakhand
पशचिमी कषतर Western Region
छततीसगढ़ Chhattisgarh
Apr-Nov 2018- No cuts
Maximum Demand cut-58MW
Energy cut- 00020-00032 MUsday
गरिजत Gujarat
मधय परिश Madhya Pradesh
महजिजषटर Maharashtra
गोवज Goa
दकषकषणी कषतर Southern Region
आनधर परिश Andhra Pradesh
तलगजनज Telangana
कनजाटक Karnataka
किल Kerala
तममल नजड Tamil Nadu
पडचिी Puducherryपरवी कषतर Eastern Region
बबहजि Bihar
झजिखणड Jharkhand
ओडडशज Odisha
पशशचम बगजल West Bengal
No N
otifie
d Cu
ts
27
मािण 2019 म इडथरीर पर वरवदयत करौती का वरवरवरण Notified Power CutsRestrictions on Industries during April2019
राजय कषतर State Regionऊराणमाग करौती EnergyDemand Cut
No N
otifie
d Cu
tsNo
Notifie
d Cu
ts
अपरल2019 April 2019 अपरल2019 -अपरल2019 April2019 to April2019
उततरी कषतर Northern Region
चडीगढ़ Chandigarh Data not received Data not received
दिलली Delhi Data not received Data not received
हरियजणज Haryana 0811 hrsday 0811 hrsday
दहमजचल परिश Himachal Pradesh HPSEBL has only 2 agriculture consumers and uninterrupted
power is being supplied to agriculture sector
HPSEBL has only 2 agriculture consumers and uninterrupted
power is being supplied to agriculture sector
रमम कशमीि Jammu amp Kashmir Data not received Data not received
परजब Punjab 379 hrsday 379 hrsday
िजरसथजन Rajasthan 0630 hrsday 0630 hrsday
उतति परिश Uttar Pradesh 2157 hrsday 2157 hrsday
उततिजखड Uttarakhand 2359 hrsday 2359 hrsday
पशचिमी कषतर Western Region
छततीसगढ़ Chhattisgarh 18 hrsday 18 hrsday
गरिजत Gujarat 8 hrsday 8 hrsday
मधय परिश Madhya Pradesh Three-Phase Supply(Irrigation)- 0953 hrs day Three-Phase
(Mixed) Supply - 2334 hrs day
Three-Phase Supply(Irrigation)- 0953 hrs day Three-Phase
(Mixed) Supply - 2334 hrs day
महजिजषटर Maharashtra Three-Phase Supply(Irrigation)- 9 hrs day Three-Phase Supply(Irrigation)- 9 hrs day
गोवज Goa No restriction No restriction
दकषकषणी कषतर Southern Region
आनधर परिश Andhra Pradesh 07 hrsday 07 hrsday
तलगजनज Telangana 24 hrsday 24 hrsday
कनजाटक Karnataka 6 hrsday 6 hrsday
किल Kerala No Restrictions No Restrictions
तममल नजड Tamil Nadu 9 hrsday (6 hrs during day time and 3 hrs during night time) 9 hrsday (6 hrs during day time and 3 hrs during night time)
पडचिी Puducherry No Restrictions No Restrictions
परवी कषतर Eastern Region
बबहजि Bihar 18 hrsday 18 hrsday
झजिखणड Jharkhand 20 hrsday 20 hrsday
ओडडशज Odisha 24 hrsday 24 hrsday
पशशचम बगजल West Bengal 23 hrsday 23 hrsday
28
मारच 2019 कषि कषतर को षिदयत आपरतच का षििरण Power Supply to Agricultural Sector during March2019
राजय कषतर State Regionऔसत वरवदयत आपरत ण घनरो म Average Hours of Supply
On segregated feeders
SNo Contents Page
1 Growth of Installed Capacity since 6th Plan 29
2 Progress of Transmission Sector since 6th Plan 30
3 All India Yearly Coal consumption for Power Generation (Utilities)
4 All India Annual Per Capita Consumption of Electricity since -2006
5 Average cost of power supply amp Average realisation (Paisakwh)
6 Growth of Rural Electrification amp Pump Sets Energisation
7 Status of Hydro Schemes Cleared by the CEA in Apr-2019
Section G - Growth of Power Sector
31
32
(In MW)
Coal Gas Diesel Total
End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472
End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634
End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537
End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596
End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921
End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703
End of 12th Plan 19216288 2532938 83763 21832988 6780 4447842 50018 31960630
Up to Apr-2019 20070450 2493722 63763 22627934 678000 4539922 7764163 35610019
Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-17) = 51529 MW
Electricity Generation (MU) Targets and Achievements for 2016-17
Coal Gas Diesel Nuclear Hydro Res Total
2007045 2493722 637629 678000 453992 77641625 22925174
29
1 Growth of Installed Capacity Since 6th Plan
Plan YearThermal
Nuclear Hydro RES (MNRE) Total
2007045
2493722637629
678000
4539922
77641625
Total Installed Capacity 35610019 MW
Coal Gas Diesel Nuclear Hydro Res
Progress of Transmission Sector in the Country up to April 2019
1 TRANSMISSION LINES (All fig in CKM)
At the end of
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
6th plan 0 0 0 0 0 0 0 0 0 0 0 0 1831 4198 0 6029 1641 44364 0 46005 3472 48562 0 52034
7th plan 0 0 0 0 0 0 0 0 0 0 0 0 13068 6756 0 19824 4560 55071 0 59631 17628 61827 0 79455
8th plan 0 0 0 0 1634 0 0 1634 0 0 0 0 23001 13141 0 36142 6564 73036 0 79600 31199 86177 0 117376
9th plan 0 0 0 0 3234 1504 0 4738 751 409 0 1160 29345 20033 0 49378 8687 88306 0 96993 42017 110252 0 152269
10th plan 0 0 0 0 4368 1504 0 5872 1775 409 0 2184 48708 24730 0 73438 9444 105185 0 114629 64295 131828 0 196123
11th Plan 0 0 0 0 5948 1504 1980 9432 4839 411 0 5250 71023 30191 5605 106819 10140 125010 830 135980 91950 157116 8415 257481
12th Plan 6124 0 0 6124 5948 1504 1980 9432 25465 1177 4598 31240 92482 48240 17065 157787 11014 151276 978 163268 141033 202197 24621 367851
13th Plan (Up
to Mar2019)6124 0 0 6124 5948 1504 1980 9432 33692 1512 6605 41809 101335 58238 21173 180746 11734 162552 1010 175296 158833 223806 30768 413407
13th Plan (Up
to Apr-19)6124 0 0 6124 5948 1504 1980 9432 33745 1512 6605 41862 101335 58258 21173 180766 11734 162953 1010 175697 158886 224227 30768 413881
27150 600 MW of 132 kV Inter-Regional power transmission capacity links which are operated radially from time to time is not added in the total
75050
47900
24000
99050
30
Grand Total
Note - The figure upto the end of 10th plan in for stringing progress including the lines not commissioned Now only commissioned lines are reckoned Accordingly the figure for 10th plan (end) may read
as 187555 after adjusting with (-) 10852 Ckm
Inter-regional Power Transfer Capacity (MW)
plusmn 800 kV HVDC plusmn 500 kV HVDC 765 kV 400 kV 220 kV
IR addition in 12th
Plan (up to March
2017)
Inter-regional
Transmission
Capacity at the end
of Plan Period 2017-
22 (as on April19)
IR at the end of 11th
PlanIR at the end of 12th
Plan
IR Capacity Addition
at the end of Plan
Period 2017-22 (Till
April 19)
2004-05 27800
2005-06 28100
2006-07 30200
2007-08 33000
2008-09 35500
2009-10 36700
2010-11 38700
2011-12 41756
2012-13 45460
2013-14 48940
2014-15 53040
2015-16 54590
2016-17 57430
2017-18 60800
2018-19 62890
Year
2005-06
2006-07
2007-08
2008-09
2009-10
2010-11
2011-12
2012-13
2013-14
2014-15
2015-16
2016-17
2017-18
2018-19
2004-05 254 209 7568
2005-06 260 221 7636
2006-07 276 227 7423
2007-08 293 239 7727
2008-09 340 263 8713
2009-10 355 268 8870
2010-11 398 303 11975
2011-12 455 330 13514
2012-13 501 376 14867
2013-14 518 175
2014-15 520
Source- PFC Reports on the performance of State Power Utilities 31
1181
7335
7786
91441
8188
88363
957
1010
1075
1122
1149
(GrossGen+ Net Import) Mid-year population Provisional
5 Average cost of power supply amp average realization ( paiseKWH )
Yearcost of supply
(paiseunit)
Realization(paiseunit)
Including AgricultureOnly
Agriculture
6719
7171
3 All India yearly Coal Consumption for Power Generation (Utilities)
YEARCoal Consumption
Million Tonnes
4 All India Annual per Capita consumption of Electricity Since 2006
Per Capita Consumption ( kWh)
6314
Sl
NoExecuting Agency
Installed
Capacity (MW)Cost (Rs crore)
Date of
Clearance
32
Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as
Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received
from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made
available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified
villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is
independent of the earlier published reports
No Hydro Electric Project has been issued concurrenceAppraisal letter by CEA during April 2019
7 Status of Hydro Schemes Cleared by the CEA in Apr-2019
Name of Scheme
1999-002000-01
297594
010408 to 310309010409 to 310310
10th Plan
2005-062006-07
322968331020
6 Growth Of Rural Electrification amp Pumpsets Energisation
Plan Year
9th Plan2002-03
134092626
4111
Pump Sets Energised Villages Electricfied (Nos)
2001-02
284064367244
1218
27801997-981998-99
3207
482864
12632
1576036
4451722594
15455554
2314176
397343611750
2093311060316074
65109527813884
46708
18423975
499150
2003-042004-05
5743
9769
Cumu upto End of 10th Plan
010407 to 310308
010410 to 310311557976840909
010411 to 310312
412667
86293726
No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification
since 2004-05
65291374575 296361511th Plan
Cumu upto End of 11th Plan
596556 21212860
557439Cummulative up to end of 12th Plan
SN Contents Page
1 Rate of sale of power for the year 2016-17 33-41
RATE OF SALE OF POWER FOR THE YEAR 2016-17
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) NORTHERN REGION
CENTRAL SECTOR
BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 18000 66900 19800
CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 54000 222400 21600
CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 30000 144400 19600
CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 23100 91700 42600
PARBATI - III HPS NHPC LTD HYDRO-HYDRO 52000 68200 54800
DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 28000 95600 30000
CHUTAK NHPC LTD HYDRO-HYDRO 4400 22000 79800
DULHASTI HPS NHPC LTD HYDRO-HYDRO 39000 228000 56400
SALAL HPS NHPC LTD HYDRO-HYDRO 69000 342300 11000
TANAKPUR HPS NHPC LTD HYDRO-HYDRO 9420 43000 29600
URI HPS -I NHPC LTD HYDRO-HYDRO 48000 280300 16000
URI HPS - II NHPC LTD HYDRO-HYDRO 24000 147300 48600
NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 4500 24600 88200
SEWA - II NHPC LTD HYDRO-HYDRO 12000 47100 43400
ANTA CCPP NTPC LTD THERMAL-GASN 41930 67539 32400
AURAIYA CCPP NTPC LTD THERMAL-GASN 66336 53501 39100
BADARPUR TPS NTPC LTD THERMAL-COAL 70500 159153 44800
DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 84000 296170 42300
DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 98000 526686 46300
DADRI CCPP NTPC LTD THERMAL-GASHSD 82978 227469 33000
FARIDABAD CCPP NTPC LTD THERMAL-GASN 43159 115577 30800
RIHAND STPS I NTPC LTD THERMAL-COAL 100000 596766 24500
RIHAND STPS II NTPC LTD THERMAL-COAL 100000 737069 24600
RIHAND STPS III NTPC LTD THERMAL-COAL 100000 706546 30600
SINGRAULI STPS NTPC LTD THERMAL-COAL 200000 1394068 20400
TANDA TPS NTPC LTD THERMAL-COAL 44000 295438 40800
UNCHAHAR TPS I NTPC LTD THERMAL-COAL 42000 256454 39800
UNCHAHAR TPS II NTPC LTD THERMAL-COAL 42000 273577 38900
UNCHAHAR TPS III NTPC LTD THERMAL-COAL 21000 142780 43000
KOLDAM NTPC LTD HYDRO-HYDRO 80000 363260 43600
NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 303575 25841
RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 108000 668677 35374
NJHPS SJVNL HYDRO-HYDRO 150000 699496 23820
RAMPUR HPS SJVNL HYDRO-HYDRO 41202 195982 32260
TEHRI HPP THDC HYDRO-HYDRO 100000 272543 51800
KOTESHWAR HEP THDC HYDRO-HYDRO 40000 106244 53400
IGSTPS JHAJJAR ARAVALI P CPL THERMAL-COAL 150000 510429 49490
NEYVELI BARSINGSAR NEYVELI LIG CORP LTD THERMAL-LIG 25000 127520 38040
STATE SECTOR
PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 21000 14222 48200
PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 21000 19205 48400
PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 25000 102257 42600
PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 25000 62107 41800
DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 60000 312213 41000
RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 120000 35767442200
WYC HYDEL STATION HPGCL HYDRO-HYDRO 6240 20365 24900
GIRI POWER HOUSE HPSEB HYDRO-HYDRO 6000 13958 7600
ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 1695 5467 11900
BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 12000 18528 6700
GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 2250 7462 22500
BASSI POWER HOUSE HPSEB HYDRO-HYDRO 6600 29649 7500
BINWA POWER HOUSE HPSEB HYDRO-HYDRO 600 2749 19300
ANNEXURE-I
RATE OF SALE OF POWER FOR THE YEAR 2016-2017
Page 33
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) GAJ POWER HOUSE HPSEB HYDRO-HYDRO 1050 2914 26700
BANER POWER HOUSE HPSEB HYDRO-HYDRO 1200 2864 16200
HOLI POWER HOUSE HPSEB HYDRO-HYDRO 300 616 22500
THIROT POWER HOUSE HPSEB HYDRO-HYDRO 450 1126 22500
KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 1200 3064 22500
LARJI POWER HOUSE HPSEB HYDRO-HYDRO 12600 53677 23700
NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 250 750 31000
CHABA POWER HOUSE HPSEB HYDRO-HYDRO 175 465 23300
RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 150 101 13400
SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 200 000 22500
KILLAR HPSEB HYDRO-HYDRO 030 050 22500
BHABA AUGUMENP H HPSEB HYDRO-HYDRO 450 1276 22500
BS CHAMBA HPSEB HYDRO-HYDRO 045 099 19500
GUMMA HPSEB HYDRO-HYDRO 300 423 22500
GAS TURBINE POWER STATION IPGCL THERMAL-GAS 27000 67233 39300
PPS-I PPCL THERMAL-GAS 33000 175905 38300
PPS-III PPCL THERMAL-GAS 137120 196879 36100
LOWER JHELUM JampKPDD HYDRO-HYDRO 10500 60214 5100
UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 2260 10514 6300
UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 10500 44202 8500
GANDHARBAL JampKPDD HYDRO-HYDRO 1500 8925 4700
KARNAH MPH JampKPDD HYDRO-HYDRO 200 1122 31000
CHENANI I JampKPDD HYDRO-HYDRO 2330 10892 6600
CHENANI II JampKPDD HYDRO-HYDRO 200 1188 9300
CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 750 3634 14200
IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 375 2108 18500
IGO MERCHELLONG JampKPDD HYDRO-HYDRO 300 1572 29700
PAHALGAM MHP JampKPDD HYDRO-HYDRO 450 1713 32900
MARPACHOO JampKPDD HYDRO-HYDRO 075 375 29800
HAFTAL JampKPDD HYDRO-HYDRO 100 483 28700
SANJAK JampKPDD HYDRO-HYDRO 126 441 36000
SEWA-III JampKPDD HYDRO-HYDRO 900 3273 20200
BHADERWAH JampKPDD HYDRO-HYDRO 150 935 8900
BAZGO JampKPDD HYDRO-HYDRO 030 108 33300
SUMOOR JampKPDD HYDRO-HYDRO 010 045 35400
HUNDER JampKPDD HYDRO-HYDRO 040 176 26200
STAKNA JampKPDD HYDRO-HYDRO 400 1933 4100
KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 124000 662879 31360
SURATGARH TPS RRVUNL THERMAL-COAL 150000 402328 41730
CHHABRA TPS 1amp 2 RRVUNL THERMAL-COAL 50000 305946 36700
CHHABRA TPS 3 RRVUNL THERMAL-COAL 25000 151536 36700
CHHABRA TPS 4 RRVUNL THERMAL-COAL 25000 155896 36700
RAMGARH GT POWER PROJECT RRVUNL THERMAL-COAL 22050 43177 41800
RAMGARH GAS T P PROJECT 3 RRVUNL THERMAL-GAS 5000 93615 41800
DHOLPUR C C POWER PROJECT RRVUNL THERMAL-R-LNG 33000 9486 46110
MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 14000 20855 34192
MINI MICRO HYDEL (MMH) P S RRVUNL HYDRO-HYDRO 2385 851 37800
KALISINDH TPP 1 RRVUNL THERMAL-COAL 60000 341543 45000
KALISINDH TPP 2 RRVUNL THERMAL-COAL 60000 211588 45000
KHARA HEP UPJVNL HYDRO-HYDRO 7200 26654 7200
MATATILLA HEP UPJVNL HYDRO-HYDRO 3060 12219 6500
OBRA HEP UPJVNL HYDRO-HYDRO 9900 21517 6300
RIHAND UPJVNL HYDRO-HYDRO 30000 57369 5500
ANPARA A TPS UPRVUNL THERMAL-COAL 63000 317536 27000
ANPARA B TPS UPRVUNL THERMAL-COAL 100000 705605 22700
ANPARA D UPRVUNL THERMAL-COAL 100000 300158 39800
HARDUAGANJ TPS UPRVUNL THERMAL-COAL 16500 45817 49200
HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 50000 304389 46600
OBRA A TPS UPRVUNL THERMAL-COAL 28800 13158 34000
OBRA B TPS UPRVUNL THERMAL-COAL 100000 328124 21900
Page 34
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) PANKI TPS UPRVUNL THERMAL-COAL 21000 66488 50300
PARICHHA TPS UPRVUNL THERMAL-COAL 22000 38762 49400
PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 42000 231931 45600
PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 50000 276722 50400
CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 24000 70845 8290
CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 14400 75366 8390
DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 3375 9595 12080
DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 5100 18701 10520
KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4140 17359 12330
KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 12000 33001 9420
KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 3000 11953 8320
TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 9000 33983 12460
MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 30400 124510 16110
RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 19800 17897 10550
MPUR UTTARAKHAND JVNL HYDRO-HYDRO 930 5121 19200
PATHRI UTTARAKHAND JVNL HYDRO-HYDRO 2040 11636 14200
GALOGI UTTARAKHAND JVNL HYDRO-HYDRO 300 648 12500
PRIVATE SECTOR
MGTPP CLP INDIA PVT LTD THERMAL-COAL 132000 268902 41940
SHRINAGAR HEP ALAKNANDA HPCL HYDRO-HYDRO 33000 127414 48800
GAMA INFRAPROP CCPP GAMA INFRAPROP PVT THERMAL-GAS 22500 52686 47000
PPGCL (BARA) JP POWER VENTURES LTD THERMAL-COAL 198000 448200 38500
MALANA HEP MALANA PCL HYDRO-HYDRO 8600 26354 29792
MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 10000 30369 32580
ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 19200 56347 36079
KASHANG HEP H P PCL HYDRO-HYDRO 19500 5034 29200
BASPA-II HEP HBPCL HYDRO-HYDRO 30000 132769 13600
KARCHAM WANGTOO HEP HBPCL HYDRO-HYDRO 100000 434386 36600
RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 108000 582600 43700
RITHALA COMBI CY POWER PLANT TATA POWER DDL THERMAL-GAS 9480 000 11900
RAJPURA TPS NABHA POWER LTD THERMAL-GAS 140000 901484 39000
TALWANDI SABO POWER LTD TALWANDI SABO POWER LTD THERMAL-COAL 198000 636040 49548
ROJA THERMAL POWER STATION ROJA POWER SCL THERMAL-COAL 120000 727200 43400
KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 34400 63400
BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 36000 62600
MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 38200 60800
UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 37900 61500
KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 42300 58800
LALITPUR PGCL BAJAJ ENERGY PVT LTD THERMAL-COAL 198000 359400 47300
PRAYAGRAJ PGCL PRAYAGRAJ PGCL THERMAL-COAL 132000 448200 38595
KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 132000 783182 33438
WESTERN REGION
CENTRAL SECTOR
INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 100000 325333 23892
OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 52000 141663 34001
GANDHAR CCPP NTPC LTD THERMAL-GAS 65739 221924 28700
KAWAS CCPP NTPC LTD THERMAL-GASN 65620 167929 27000
KORBA I amp II NTPC LTD THERMAL-COAL 210000 1499171 20500
KORBA III NTPC LTD THERMAL-COAL 50000 358746 26600
SIPAT STPS I NTPC LTD THERMAL-COAL 198000 1479902 26800
SIPAT STPS II NTPC LTD THERMAL-COAL 100000 766549 26500
VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 126000 693142 25800
VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 100000 608781 23800
VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 100000 673475 27600
VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 100000 655924 32900
VINDHYACHAL STPS V NTPC LTD THERMAL-COAL 50000 328265 31700
MOUDA I NTPC LTD THERMAL-COAL 100000 343130 44500
MOUDA Ii NTPC LTD THERMAL-COAL 66000 40637 39900
RATNAGIRI GAS amp POWER PVT LTD RGPPL THERMAL-GAS 196708 442485 47000
KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 000 24729
TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 32000 201227 10740
Page 35
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 365122 19069
TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 787444 29324
STATE SECTOR
GSEG-HAZIRA15610 MW GUJARAT S ENEGEN LTD THERMAL-GAS 15610 1805 28200
GSEG-HAZIRA35143 MW GUJARAT S ENEGEN LTD THERMAL-GAS 35130 22276 51300
GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 21978 51800
AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 13929 26100
KORBA TPS EAST CSPGCL THERMAL-COAL 44000 198673 33880
DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 365808 27570
KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 316500 30420
HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 532878 19410
CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 515 58300
MTTPS CHAMPA U-I CSPGCL THERMAL-COAL 50000 220376 39000
MTTPS CHAMPA U-II CSPGCL THERMAL-COAL 50000 23709 10000
SHP GANGREL CSPGCL HYDRO-HYDRO 1000 2350 36790
BANGO HEP CSPGCL HYDRO-HYDRO 12000 14662 8900
MHP KORBA WEST CSPGCL HYDRO-HYDRO 170 859 38190
SIKASAR HEP CSPGCL HYDRO-HYDRO 700 418 26870
DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8843 74500
DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 19446 51500
GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 66388 71600
GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127488 41300
KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 96072 43900
KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 29841 56400
SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 184966 58800
UKAI 1-5 GSECL THERMAL-COAL 85000 204891 46900
UKAI TPS 6 GSECL THERMAL-COAL 50000 284448 48200
WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 271999 58300
WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 82808 44100
KADANA HPS GSECL HYDRO-HYDRO 24200 34433 16800
UKAI HPS GSECL HYDRO-HYDRO 30500 40585 6100
TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 123000 11500
BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 8900 10900
BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 7200 27500
JHINNA HPS MPPGCL HYDRO-HYDRO 2000 9700 18500
RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 44300 3400
GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 17300 4600
SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 4100 16900
MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 14600 27000
PENCH HPS MPPGCL HYDRO-HYDRO 16000 23700 8100
RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 3000 16900
AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 134400 35100
SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 283800 38700
SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 344600 34300
SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 111600 61600
SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 211800 58000
SSTPS PH-I MPPGCL THERMAL-COAL 120000 233100 84300
BHUSAWAL TPS MSPGCL THERMAL-COAL 142000 566258 51100
CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1365682 33700
KHAPERKHEDA MSPGCL THERMAL-COAL 134000 706207 39100
KORADI TPS MSPGCL THERMAL-COAL 62000 443206 42000
NASIK TPS MSPGCL THERMAL-COAL 63000 297275 47000
PARLI TPS MSPGCL THERMAL-COAL 113000 175934 71600
PARAS MSPGCL THERMAL-COAL 50000 267931 38700
URAN CCPP MSPGCL THERMAL-GAS 67200 320330 30600
KOYANA MSPGCL HYDRO-HYDRO 195600 328155 13100
SMALL HYDRO POWER PLANTS MSPGCL HYDRO-HYDRO 45400 93062 30500
BHIRA MSPGCL HYDRO-HYDRO 8000 10046 8400
TILLARI MSPGCL HYDRO-HYDRO 8900 10584 3100
SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 233298 20500
SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 87633 20500
PRIVATE SECTOR
Page 36
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 81282 46750
JNSTPP(JAYPEE NIGRIE) JP POWER VENTURES LTD THERMAL-COAL 132000 726695 29310
MB POWER MB POWER THERMAL-COAL 120000 345632 38310
ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 754922 28671
ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 780761 23495
ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 198000 1263784 32090
ADANI POWER MAHARA ADANI POWER LTD THERMAL-COAL 330000 1666191 34124
AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 170065 36827
SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 252035 45129
ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 458551 36000
ESSAR POWER MP LTD ESSAR POWER MP LTD THERMAL-COAL 60000 243040 28600
VEDANTA LTD (P P -I) VEDANTA LTD THERMAL-GAS 3000 15044 24000
VEDANTA LTD (P P -II) VEDANTA LTD THERMAL-GAS 3000 21293 24000
PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 8234600 24000
165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 5850 64390
145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 68717 40349
SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 132655 28776
SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 144686 38567
MUNDRA UMPPCOASTAL GUJARAT POWER
LTD THERMAL-IMP COAL 400000 2530300
23900
LANCO AMARKANTAK TPP PATHADIH
U-ILANCO AMARKAN POWER LTD THERMAL-COAL 30000 195500
29200
LANCO AMARKANTAK TPP PATHADIH
U-IILANCO AMARKAN POWER LTD THERMAL-COAL 30000 206900
27600
BARADARHA TPS D B POWER LTD THERMAL-COAL 120000 677373 29200
JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 405000 28900
JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 453000 40500
DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 339437 40700
TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 293400 44000
TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 137200 37000
TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 174900 44000
BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 92900 14100
BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23700 34300
KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 27600 48300
CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2530300 23900
BHANDARDRA HEP -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 2475 54900
SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 161400 26500
SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 445000 39000
SOTHERN REGION
CENTRAL SECTOR
NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 325699 54820
NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 305532 39880
NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 998805 38510
NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 113016 54070
NEYVELI TAMILNADU POWER LTD JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 625274 42200
VALLUR TPS NTPC TECL THERMAL-COAL 150000 856438 42350
R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 1493 84300
RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1502919 29400
RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 341291 31800
SIMHADRI I NTPC LTD THERMAL-COAL 100000 688382 36800
SIMHADRI II NTPC LTD THERMAL-COAL 100000 663657 43400
KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 593110 31324
MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 291625 21764
KKNPP-1 amp 2 NPCIL NUCLEAR-NUCLEAR 200000 572609 40948
MINICOY LAKSHADEEP THERMAL-DIESEL 340 770 29600
KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1097 29600
AMINI LAKSHADEEP THERMAL-DIESEL 265 509 29600
ANDROTT LAKSHADEEP THERMAL-DIESEL 219 524 29600
KALPENI LAKSHADEEP THERMAL-DIESEL 175 356 29600
AGATTI LAKSHADEEP THERMAL-DIESEL 195 658 29600
KADMAT LAKSHADEEP THERMAL-DIESEL 190 414 29600
KILTAN LAKSHADEEP THERMAL-DIESEL 150 269 29600
CHETLET LAKSHADEEP THERMAL-DIESEL 100 139 29600
BITRA LAKSHADEEP THERMAL-DIESEL 043 024 29600
BANGARAM LAKSHADEEP THERMAL-DIESEL 018 009 29600
Page 37
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) STATE SECTOR
Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 721811 46500
Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 50000 336142 46500
RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 237358 46500
RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 239926 46500
RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 124500 46500
SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 62109 46500
UPPER SILERU APGENCO HYDRO-HYDRO 24000 33000 46500
LOWER SILERU APGENCO HYDRO-HYDRO 46000 81066 46500
DONKARAI APGENCO HYDRO-HYDRO 2500 6007 46500
PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 1262 46500
CHETTIPETA APGENCO HYDRO-HYDRO 100 214 46500
MUCHKUND APGENCO HYDRO-HYDRO 12000 37571 46500
NAGARJUNASAGAR RCPH APGENCO HYDRO-HYDRO 9000 606 46500
TUNGABHADRA HES amp HAMPI(AP
Share)
APGENCO HYDRO-HYDRO 7200 6100 46500
KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 352232 42600
KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 288131 32500
KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 319272 46500
RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 40073 44300
KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 308317 46000
KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 308963 51300
SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 61004 76600
NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 17960 75300
PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 20873 58300
POCHAMPAD-I TSPGENCO HYDRO-HYDRO 2700 5455 29800
POCHAMPAD-II TSPGENCO HYDRO-HYDRO 900 1932 40700
NIZAMSAGAR TSPGENCO HYDRO-HYDRO 1000 1126 53400
RAICHUR TPS 1 to 7 KPCL THERMAL-COAL 147000 890866 43800
RAICHUR TPS 8 KPCL THERMAL-COAL 25000 159523 48200
BELLARI TPS 1 KPCL THERMAL-COAL 50000 318679 51100
BELLARI TPS 2 KPCL THERMAL-COAL 50000 232347 55600
BELLARI TPS 3 KPCL THERMAL-COAL 70000 47565 34400
BHADRA PH KPCL HYDRO-HYDRO 3920 2369 45900
GERUSUPPA PH KPCL HYDRO-HYDRO 24000 26990 22000
GHAT PRABHA HEP KPCL HYDRO-HYDRO 3200 4777 25300
KADRA HPS KPCL HYDRO-HYDRO 15000 16889 26800
NAGJHARI KPCL HYDRO-HYDRO 90000 155159 9800
KODASALLI DPH KPCL HYDRO-HYDRO 12000 14854 19200
MUNIRA+MGH+SPH+SPH KPCL HYDRO-HYDRO 22640 48211 7900
SHARAVATHY HPS KPCL HYDRO-HYDRO 108550 276215 5400
ALMATTI DPH KPCL HYDRO-HYDRO 29000 39611 24600
VARAHI UGPH KPCL HYDRO-HYDRO 46000 71368 15600
IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 17196 15300
IDUKKI HPS KSEB HYDRO-HYDRO 78000 137905 15300
KAKKAD HPS KSEB HYDRO-HYDRO 5000 13063 15300
KALLADA HPS KSEB HYDRO-HYDRO 1500 4436 15300
KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 46544 15300
KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 635 15300
LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 30822 15300
MALANKARA HPS KSEB HYDRO-HYDRO 1050 2474 15300
MATTUPETTY KSEB HYDRO-HYDRO 200 230 15300
MALAMPUZHA KSEB HYDRO-HYDRO 250 063 15300
CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 864 15300
URUMI ST I amp II KSEB HYDRO-HYDRO 615 903 15300
LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 248 15300
NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7765 19625 15300
PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 16601 15300
PANNIAR HPS KSEB HYDRO-HYDRO 3240 6217 15300
PORINGALKUTHU KSEB HYDRO-HYDRO 3600 10052 15300
PORINGALKUTHU LBE KSEB HYDRO-HYDRO 1600 9438 15300
PEPPARA KSEB HYDRO-HYDRO 300 395 15300
POOZHITHODE KSEB HYDRO-HYDRO 480 1045 15300
Page 38
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) PEECHI KSEB HYDRO-HYDRO 125 040 15300
RANI-PERUNADU KSEB HYDRO-HYDRO 400 585 15300
SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 79783 15300
SENGULAM HPS KSEB HYDRO-HYDRO 5120 11558 15300
SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 16711 15300
VILANGAD KSEB HYDRO-HYDRO 750 1578 15300
BARAPOLE KSEB HYDRO-HYDRO 1500 1932 15300
VELLATHOOVAL KSEB HYDRO-HYDRO 360 305 15300
CHIM0NY KSEB HYDRO-HYDRO 250 156 15300
ADYANPARA KSEB HYDRO-HYDRO 350 501 15300
BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 554 15300
KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 3801 15300
KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 23132 32800
ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 14416 62280
METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 523970 62280
METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 321270 62280
NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 336575 62280
NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 591240 62280
TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 508966 62280
KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 30897 62280
VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 18720 90699 62280
KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 33593 62280
BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 1047 62280
PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 1250 62280
PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 330 62280
MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 4897 62280
MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 032 62280
KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15681 62280
KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 40608 62280
KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 21342 62280
KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 4717 62280
KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4322 62280
KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2399 62280
METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 4416 62280
METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 8035 62280
BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2187 62280
BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2359 62280
BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2511 62280
BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 1949 62280
BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 1819 62280
POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 172 62280
SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 241 62280
MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 026 62280
THIRUMOORTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 136 62280
PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 9309 62280
VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 353 62280
SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 4192 62280
PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 6571 62280
SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 1186 62280
SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6319 62280
ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 6122 62280
KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 28674 62280
SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 18381 62280
SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 4258 62280
KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 12680 62280
KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4201 62280
ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 000 62280
PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 19175 62280
AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 078 62280
BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 504 62280
BHAVANI KATTALAI (BKB)(IIIampIII BB I amp II)TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 5847 62280
PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 000 62280
Page 39
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) SRI DAMODARAM STPS APPDCL THERMAL-COAL 160000 808108 36300
PRIVATE SECTOR
KARUPPUR TANJORE LANCO TANJORE PCL THERMAL-GAS 12000 48096 28770
SIMHAPURI ENERGY LTD SIMHAPURI ENERGY LTD THERMAL-COAL 60000 143900 39100
JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 7111 45500
SBU 1 JSW ENERGY LTD
VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 26000 159100
43300
SBU 2 JSW ENERGY LTD
VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 60000 247900
42800
LANCO KPLLANCO KONDAPALLI POWER
LTDTHERMAL-GAS 36814 85060
25776
LANCO KPL STG -IILANCO KONDAPALLI POWER
LTDTHERMAL-GAS 36600 12979
46330
LANCO KPL STG -IIIALANCO KONDAPALLI POWER
LTDTHERMAL-GAS 37100 85710
46330
LANCO KPL STG -III BLANCO KONDAPALLI POWER
LTDTHERMAL-GAS 37100 43639
46330
HINDUJA NATIONAL PCL HINDUJA NATIONAL PCL THERMAL-COAL 104000 303000 38200
MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 121164 49940
UDUPI POWER COR LTD ADANI POWER LTD THERMAL-COAL 120000 754613 42500
SPECTRUM POWER GENERATION
LTD SPECTRUM PG LTD THERMAL-GASN 20525 9256812
34952
TAQA NEYVELI POWER COM PVT
LTD TAQA NEYVELI THERMAL-LIG 25000 5840
34500
ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 251000 51000
ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 207860 36800
GMR VEMAGIRI POWER GENERATION
LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 30117
46450
EASTERN REGION
CENTRAL SECTOR
MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 64675 53113
MTPS STAGE - II KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 39000 1432 69138
BOKARO `B` TPS DVC THERMAL-COAL 63000 145670 31539
MEJIA TPS U 1-3 DVC THERMAL-COAL 63000 348298 31552
MEJIA TPS U 4 DVC THERMAL-COAL 21000 116099 34997
MEJIA TPS U 5-6 DVC THERMAL-COAL 50000 276427 35976
MEJIA TPS U 7-8 DVC THERMAL-COAL 100000 552854 36991
DURGAPUR STEEL TPS DVC THERMAL-COAL 100000 665550 39323
DURGAPUR TPS DVC THERMAL-COAL 21000 59270 35416
RAGHUNATHPUR TPS DVC THERMAL-COAL 120000 201650 35326
MAITHON HYDEL STA DVC HYDRO-HYDRO 6320 12200 17984
CHANDRAPURA TPSU1-3 DVC THERMAL-COAL 42000 257610 35095
CHANDRAPURA TPSU7-8 DVC THERMAL-COAL 50000 306673 34987
KODERMA TPS DVC THERMAL-COAL 100000 380180 38131
PANCHET HPS DVC HYDRO-HYDRO 8000 13360 17984
TILLAYA HPS DVC HYDRO-HYDRO 400 1410 17984
RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34700 35400
TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 277300 23200
TLDP -III NHPC LTD HYDRO-HYDRO 13200 55400 62000
TLDP -IV NHPC LTD HYDRO-HYDRO 16000 60300 25600
FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 957219 33700
FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 308943 41000
BONGAINGAON TPS NTPC LTD THERMAL-COAL 25000 153663 58600
KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 542277 34200
KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 942591 34200
BARH-II NTPC LTD THERMAL-COAL 132000 728021 44500
TALCHER TPS NTPC LTD THERMAL-COAL 46000 335521 30100
TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 702319 25600
TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1436521 24700
STATE SECTOR
BTPS(RampM) BIHAR STATE PGCL THERMAL-COAL 22000 12142 39700
BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 98331 10602
HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 50593 9482
CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 19689 2605
RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 53192 6033
UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 147208 14637
Page 40
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 60353 4519
IB TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 288567 25000
J P H GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 210 038 61100
MEYONG CHU GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 400 1086 61100
TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 122667 38200
DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 214339 43321
KOLAGHAT THERMAL POWER
STATION
WEST BENGAL PDCL THERMAL-COAL 126000 538269 31603
BAKRESHWAR THERMAL POWER
PLANT
WEST BENGAL PDCL THERMAL-COAL 105000 634876 32154
BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 45000 166855 33299
SANTHALDIH THERMAL POWER
STATION
WEST BENGAL PDCL THERMAL-COAL 50000 336442 34932
SAGARDIGHI THERMAL POWER
PROJECT
WEST BENGAL PDCL THERMAL-COAL 160000 423121 34705
JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 20344 68900
RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 24559 68900
TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 4623 68900
PURULIA PUMPED STORAGE
PROJECT
WEST BENGAL SEDCL HYDRO-HYDRO 90000 108816 68900
MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2768 68900
PRIVATE SECTOR
CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 49474 20230
CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 555500 70200
HALDIA ENERGY HALDIA ENERGY LTD THERMAL-COAL 60000 371000 50400
DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3688 63400
KAMALANGA TPS GMR KAMALANGA ENERGY LTD THERMAL-COAL 105000547670
33300
ADHUNIK POWER U-1 ADHUNIK POWER THERMAL-COAL 27000 158 44060
ADHUNIK POWER U-2 ADHUNIK POWER THERMAL-COAL 27000 168 44250
VL-JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 332800 23622
JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 43000 45250
JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 71700 37030
JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 70700 35920
JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 71100 38870
JOJOBERA UNIT 5 TATA POWER COM LTD THERMAL-COAL 12000 79300 44560
JOJOBERA UNIT 6 TATA POWER COM LTD THERMAL-WHR 12000 83700 12840
IEL KALINGANAGAR U-I TATA POWER COM LTD THERMAL-WG 6750 33400 22500
IEL KALINGANAGAR U-II TATA POWER COM LTD THERMAL-WG 6750 34800 22500
MAITHON UNIT 1 amp 2 TATA POWER COM LTD THERMAL-COAL 105000 678000 36100
HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 27500 24340
HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 28400 24340
HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 15800 24310
NORTH EASTERN REGION
CENTRAL SECTOR
LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 74100 36600
AGARTALA GT NEEPCO THERMAL-GAS 13500 88611 27210
ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 153111 32310
DOYANG HEP NEEPCO HYDRO-HYDRO 7500 25598 49801
KOPILI HEP NEEPCO HYDRO-HYDRO 20000 98186 11491
KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 19582 20237
KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 10310 17968
RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 124093 22945
TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 10100 17344 39000
STATE SECTOR
HYDRO POWER (122 Stns) ITANAGAR GOVT OF ARUNACHAL
PRADESHHYDRO-HYDRO 6971 6217270
24600
KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39514 17337
LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 82327 36810
NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 33318 48290
MYNTRIANG SHEP ST II ASSAM POWER GENCO HYDRO-HYDRO 300 567 35776
LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 9130 49200
LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 012 49200
DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 022 49200
TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 000 49200
UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 4990 16000
UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 6476 37000
UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 16494 14600
UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 3600 9556 15000
SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 758 8000
MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44070 44800
KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 154 41400
TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 091 41400
MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 411 41400
MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 394 41400
KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 760 41400
SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 3264 41400
LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 044 41400
BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 18953 28000
ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 43585 28200
GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 4080 11100
Note
LIG Lignite N Naptha WHR Waste Heat Recovery
Page 41
अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met
कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )
चडीगढ़ Chandigarh 256 256 0 00 256 256 0 00
दिलली Delhi 5664 5664 0 00 5664 5664 0 00
हरियजणज Haryana 8127 8127 0 00 8127 8127 0 00
दहमजचल परिश Himachal Pradesh 1387 1387 0 00 1387 1387 0 00
रमम कशमीि Jammu amp Kashmir 2826 2261 565 200 2826 2261 565 200
परजब Punjab 7015 7015 0 00 7015 7015 0 00
िजरसथजन Rajasthan 10560 10560 0 00 10560 10560 0 00
उतति परिश Uttar Pradesh 19935 19935 0 00 19935 19935 0 00
उततिजखड Uttarakhand 1922 1922 0 00 1922 1922 0 00
उततरी कषतर Northern Region 54476 53985 491 09 54476 53985 491 09
छततीसगढ़ Chhattisgarh 4596 4574 22 05 4596 4574 22 05
गरिजत Gujarat 17871 17865 6 00 17871 17865 6 00
मधय परिश Madhya Pradesh 10018 10018 0 00 10018 10018 0 00
महजिजषटर Maharashtra 23158 23150 8 00 23158 23150 8 00
िमन औि दिउ Daman amp Diu 341 340 1 02 341 340 1 02
िजिि व नगि हवली Dadra amp Nagar Haveli 818 818 0 00 818 818 0 00
गोवज Goa 594 594 0 00 594 594 0 00
पशचिमी कषतर Western Region 56242 56222 20 00 56242 56222 20 00
आनधर परिश Andhra Pradesh 9151 9151 0 00 9151 9151 0 00
तलगजनज Telangana 10191 10191 0 00 10191 10191 0 00
कनजाटक Karnataka 12681 12681 0 00 12681 12681 0 00
किल Kerala 4309 4300 8 02 4309 4300 8 02
तममल नजड Tamil Nadu 15972 15972 0 00 15972 15972 0 00
पडचिी Puducherry 482 480 2 05 482 480 2 05
लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0
दकषकषणी कषतर Southern Region 49155 49103 52 01 49155 49103 52 01
बबहजि Bihar 5357 5357 0 00 5357 5357 0 00
िजमोिि घजटी ननगम DVC 3039 3039 0 00 3039 3039 0 00
झजिखणड Jharkhand 1266 1266 0 00 1266 1266 0 00
ओडडशज Odisha 5389 5389 0 00 5389 5389 0 00
पशशचम बगजल West Bengal 8666 8666 0 00 8666 8666 0 00
मसशककम Sikkim 100 100 0 00 100 100 0 00
अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7
परवी कषतर Eastern Region 23349 23349 0 00 23349 23349 0 00
अरणजचल परिश Arunachal Pradesh 139 136 3 22 139 136 3 22
असम Assam 1712 1667 45 26 1712 1667 45 26
मणणपि Manipur 197 188 9 46 197 188 9 46
मघजलय Meghalaya 336 336 0 00 336 336 0 00
ममज़ोिम Mizoram 116 113 3 26 116 113 3 26
नजगजलड Nagaland 157 131 26 166 157 131 26 166
बिपिज Tripura 292 291 1 03 292 291 1 03
उततर-परवी कषतर North-Eastern Region 2848 2780 68 24 2848 2780 68 24
समपणण भारत All India 177411 176810 601 03 177411 176810 601 03
24
मजग की पनत ा म कमी Demand not Met
Excludes the supply to Bangladesh
राजयStateअपरल 2019 April2019
मजग की पनत ा म कमी Demand not Met
अधिकतम वरवदयत आपरत ण शथिरत ररपोरण (परवाणरवलोकन) Peak Power Supply Position Report (Provisional)
आकड़ मगज वजट नट Figures in MW netअपरल2019 -अपरल2019 April2019 to April2019
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
आकड़ मममलयन यननट नट Figures in MU net
ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied
कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )
चडीगढ़ Chandigarh 96 96 0 00 1561 1561 0 00
दिलली Delhi 1931 1930 1 00 32299 32282 17 01
हरियजणज Haryana 3658 3658 0 00 53665 53665 0 00
दहमजचल परिश Himachal Pradesh 832 830 2 02 9850 9618 232 24
रमम कशमीि Jammu amp Kashmir 1767 1414 353 200 19593 15868 3725 190
परजब Punjab 3585 3585 0 00 55288 55275 13 00
िजरसथजन Rajasthan 6774 6770 4 01 79826 79637 189 02
उतति परिश Uttar Pradesh 8754 8691 63 07 117101 116118 984 08
उततिजखड Uttarakhand 1067 1067 0 00 13845 13753 92 07
उततरी कषतर Northern Region 28464 28041 423 15 383028 377776 5251 14
छततीसगढ़ Chhattisgarh 2464 2457 8 03 26130 26076 54 02
गरिजत Gujarat 9890 9890 0 00 116588 116572 15 00
मधय परिश Madhya Pradesh 6236 6236 0 00 75667 75665 2 00
महजिजषटर Maharashtra 13631 13631 0 00 158285 158148 137 01
िमन औि दिउ Daman amp Diu 221 221 0 00 2557 2557 0 00
िजिि व नगि हवली Dadra amp Nagar Haveli 553 553 0 00 6317 6317 0 00
गोवज Goa 362 362 0 00 4283 4280 3 01
पशचिमी कषतर Western Region 33357 33349 8 00 389827 389615 212 01
आनधर परिश Andhra Pradesh 6072 6071 1 00 63735 63677 58 01
तलगजनज Telangana 6930 6929 1 00 66697 66635 62 01
कनजाटक Karnataka 7614 7612 1 00 71759 71690 69 01
किल Kerala 2489 2488 1 00 25029 24911 118 05
तममल नजड Tamil Nadu 10247 10245 2 00 109375 109273 102 01
पडचिी Puducherry 252 251 1 04 2761 2751 10 03
लकष-दवीप Lakshadweep 4 4 0 0 46 46 0 0
दकषकषणी कषतर Southern Region 33605 33597 8 00 339355 338938 417 01
बबहजि Bihar 2319 2318 1 00 30052 29827 225 07
िजमोिि घजटी ननगम DVC 1773 1772 1 00 22365 21995 369 17
झजिखणड Jharkhand 698 697 1 01 8682 8461 221 25
ओडडशज Odisha 2583 2582 1 00 31810 31781 30 01
पशशचम बगजल West Bengal 4585 4584 2 00 52237 52078 159 03
मसशककम Sikkim 41 41 0 00 513 512 0 01
अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 67 346 323 23 67
परवी कषतर Eastern Region 11999 11995 5 00 145658 144654 1004 07
अरणजचल परिश Arunachal Pradesh 61 60 0 06 864 855 9 10
असम Assam 680 656 23 34 9532 9204 328 34
मणणपि Manipur 68 68 1 09 916 906 10 11
मघजलय Meghalaya 173 173 0 03 1955 1953 1 01
ममज़ोिम Mizoram 50 49 0 09 668 661 8 12
नजगजलड Nagaland 58 57 1 20 902 809 93 103
बिपिज Tripura 150 150 0 00 1859 1837 21 11
उततर-परवी कषतर North-Eastern Region 1240 1214 26 21 16696 16225 471 28
समपणण भारत All India 108665 108196 469 04 1274564 1267209 7355 06
Note The revised data for March 2019 is not avaliable
Excludes energy exported to Bangladesh
राजयState
ऊराण वरवदयत आपरत ण शथिरत ररपोरण (परवाणरवलोकन) Energy Power Supply Position Report (Provisional)
25
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
Energy not Supplied Energy not Supplied
मािण2019 March2019 अपरल2018 -मािण2019 April2018 to March2019
ऊरजा पनत ा म कमी ऊरजा पनत ा म कमी
अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met
कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )
चडीगढ़ Chandigarh 223 223 0 00 369 369 0 00
दिलली Delhi 4016 4016 0 00 7016 7016 0 00
हरियजणज Haryana 6544 6544 0 00 10270 10270 0 00
दहमजचल परिश Himachal Pradesh 1683 1683 0 00 1700 1700 0 00
रमम कशमीि Jammu amp Kashmir 3277 2622 655 200 3277 2622 655 200
परजब Punjab 6564 6564 0 00 12638 12638 0 00
िजरसथजन Rajasthan 11885 11885 0 00 13276 13276 0 00
उतति परिश Uttar Pradesh 16220 16220 0 00 20498 20062 436 21
उततिजखड Uttarakhand 2002 2002 0 00 2216 2216 0 00
उततरी कषतर Northern Region 47925 47356 569 12 63166 61726 1440 23
छततीसगढ़ Chhattisgarh 4444 4128 316 71 4444 4270 174 39
गरिजत Gujarat 16263 16263 0 00 17053 16963 90 05
मधय परिश Madhya Pradesh 12328 12323 5 00 13815 13815 0 00
महजिजषटर Maharashtra 22361 22291 70 03 23864 23254 610 26
िमन औि दिउ Daman amp Diu 336 336 0 01 357 356 1 02
िजिि व नगि हवली Dadra amp Nagar Haveli 800 799 1 01 816 815 1 01
गोवज Goa 538 538 0 00 596 596 0 00
पशचिमी कषतर Western Region 53132 52965 167 03 56675 55821 853 15
आनधर परिश Andhra Pradesh 8977 8977 0 00 9459 9453 6 01
तलगजनज Telangana 10471 10471 0 00 10815 10815 0 00
कनजाटक Karnataka 12841 12841 0 00 12841 12841 0 00
किल Kerala 4264 4228 36 09 4264 4228 36 09
तममल नजड Tamil Nadu 15712 15712 0 00 15712 15712 0 00
पडचिी Puducherry 427 412 15 34 427 412 15 34
लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0
दकषकषणी कषतर Southern Region 49464 49464 0 00 49464 49464 0 00
बबहजि Bihar 4633 4633 0 00 5115 5084 31 06
िजमोिि घजटी ननगम DVC 3035 3035 0 00 3035 3035 0 00
झजिखणड Jharkhand 1210 1210 0 00 1339 1291 48 36
ओडडशज Odisha 4827 4827 0 00 5357 5357 0 00
पशशचम बगजल West Bengal 8287 8287 0 00 9130 9123 7 01
मसशककम Sikkim 100 100 0 00 106 106 0 00
अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7
परवी कषतर Eastern Region 21658 21658 0 00 23141 22733 408 18
अरणजचल परिश Arunachal Pradesh 133 131 2 15 138 138 0 01
असम Assam 1539 1508 31 20 1865 1809 56 30
मणणपि Manipur 204 199 5 25 219 216 3 12
मघजलय Meghalaya 357 357 0 00 374 372 1 04
ममज़ोिम Mizoram 108 105 3 28 121 119 2 17
नजगजलड Nagaland 127 125 2 16 156 138 18 116
बिपिज Tripura 249 249 0 00 298 293 5 17
उततर-परवी कषतर North-Eastern Region 2540 2535 5 02 2967 2850 117 39
समपणण भारत All India 169464 168745 719 04 177022 175528 1494 08
Note The revised data for March 2019 is not avaliable 26
अधिकतम वरवदयत आपरत ण शथिरत ररपोरण (परवाणरवलोकन) Peak Power Supply Position Report (Provisional)
आकड़ मगज वजट नट Figures in MW net
राजयStateमािण2019 March2019 अपरल2018 -मािण2019 April2018 to March2019
मजग की पनत ा म कमी मजग की पनत ा म कमी Demand not MetDemand not Met
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
Excludes the supply to Bangladesh
अपरल 2019 April2019 अपरल2018 -मािण2019 April2019 to April2019
उततरी कषतर Northern Region
चडीगढ़ Chandigarh(Data Not Received)दिलली Delhi
हरियजणज Haryana
दहमजचल परिश Himachal Pradeshरमम कशमीि Jammu amp Kashmir(Data
Not Received)परजब Punjab
िजरसथजन Rajasthanउतति परिश Uttar Pradesh
उततिजखड Uttarakhand
पशचिमी कषतर Western Region
छततीसगढ़ Chhattisgarh
Apr-Nov 2018- No cuts
Maximum Demand cut-58MW
Energy cut- 00020-00032 MUsday
गरिजत Gujarat
मधय परिश Madhya Pradesh
महजिजषटर Maharashtra
गोवज Goa
दकषकषणी कषतर Southern Region
आनधर परिश Andhra Pradesh
तलगजनज Telangana
कनजाटक Karnataka
किल Kerala
तममल नजड Tamil Nadu
पडचिी Puducherryपरवी कषतर Eastern Region
बबहजि Bihar
झजिखणड Jharkhand
ओडडशज Odisha
पशशचम बगजल West Bengal
No N
otifie
d Cu
ts
27
मािण 2019 म इडथरीर पर वरवदयत करौती का वरवरवरण Notified Power CutsRestrictions on Industries during April2019
राजय कषतर State Regionऊराणमाग करौती EnergyDemand Cut
No N
otifie
d Cu
tsNo
Notifie
d Cu
ts
अपरल2019 April 2019 अपरल2019 -अपरल2019 April2019 to April2019
उततरी कषतर Northern Region
चडीगढ़ Chandigarh Data not received Data not received
दिलली Delhi Data not received Data not received
हरियजणज Haryana 0811 hrsday 0811 hrsday
दहमजचल परिश Himachal Pradesh HPSEBL has only 2 agriculture consumers and uninterrupted
power is being supplied to agriculture sector
HPSEBL has only 2 agriculture consumers and uninterrupted
power is being supplied to agriculture sector
रमम कशमीि Jammu amp Kashmir Data not received Data not received
परजब Punjab 379 hrsday 379 hrsday
िजरसथजन Rajasthan 0630 hrsday 0630 hrsday
उतति परिश Uttar Pradesh 2157 hrsday 2157 hrsday
उततिजखड Uttarakhand 2359 hrsday 2359 hrsday
पशचिमी कषतर Western Region
छततीसगढ़ Chhattisgarh 18 hrsday 18 hrsday
गरिजत Gujarat 8 hrsday 8 hrsday
मधय परिश Madhya Pradesh Three-Phase Supply(Irrigation)- 0953 hrs day Three-Phase
(Mixed) Supply - 2334 hrs day
Three-Phase Supply(Irrigation)- 0953 hrs day Three-Phase
(Mixed) Supply - 2334 hrs day
महजिजषटर Maharashtra Three-Phase Supply(Irrigation)- 9 hrs day Three-Phase Supply(Irrigation)- 9 hrs day
गोवज Goa No restriction No restriction
दकषकषणी कषतर Southern Region
आनधर परिश Andhra Pradesh 07 hrsday 07 hrsday
तलगजनज Telangana 24 hrsday 24 hrsday
कनजाटक Karnataka 6 hrsday 6 hrsday
किल Kerala No Restrictions No Restrictions
तममल नजड Tamil Nadu 9 hrsday (6 hrs during day time and 3 hrs during night time) 9 hrsday (6 hrs during day time and 3 hrs during night time)
पडचिी Puducherry No Restrictions No Restrictions
परवी कषतर Eastern Region
बबहजि Bihar 18 hrsday 18 hrsday
झजिखणड Jharkhand 20 hrsday 20 hrsday
ओडडशज Odisha 24 hrsday 24 hrsday
पशशचम बगजल West Bengal 23 hrsday 23 hrsday
28
मारच 2019 कषि कषतर को षिदयत आपरतच का षििरण Power Supply to Agricultural Sector during March2019
राजय कषतर State Regionऔसत वरवदयत आपरत ण घनरो म Average Hours of Supply
On segregated feeders
SNo Contents Page
1 Growth of Installed Capacity since 6th Plan 29
2 Progress of Transmission Sector since 6th Plan 30
3 All India Yearly Coal consumption for Power Generation (Utilities)
4 All India Annual Per Capita Consumption of Electricity since -2006
5 Average cost of power supply amp Average realisation (Paisakwh)
6 Growth of Rural Electrification amp Pump Sets Energisation
7 Status of Hydro Schemes Cleared by the CEA in Apr-2019
Section G - Growth of Power Sector
31
32
(In MW)
Coal Gas Diesel Total
End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472
End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634
End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537
End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596
End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921
End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703
End of 12th Plan 19216288 2532938 83763 21832988 6780 4447842 50018 31960630
Up to Apr-2019 20070450 2493722 63763 22627934 678000 4539922 7764163 35610019
Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-17) = 51529 MW
Electricity Generation (MU) Targets and Achievements for 2016-17
Coal Gas Diesel Nuclear Hydro Res Total
2007045 2493722 637629 678000 453992 77641625 22925174
29
1 Growth of Installed Capacity Since 6th Plan
Plan YearThermal
Nuclear Hydro RES (MNRE) Total
2007045
2493722637629
678000
4539922
77641625
Total Installed Capacity 35610019 MW
Coal Gas Diesel Nuclear Hydro Res
Progress of Transmission Sector in the Country up to April 2019
1 TRANSMISSION LINES (All fig in CKM)
At the end of
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
6th plan 0 0 0 0 0 0 0 0 0 0 0 0 1831 4198 0 6029 1641 44364 0 46005 3472 48562 0 52034
7th plan 0 0 0 0 0 0 0 0 0 0 0 0 13068 6756 0 19824 4560 55071 0 59631 17628 61827 0 79455
8th plan 0 0 0 0 1634 0 0 1634 0 0 0 0 23001 13141 0 36142 6564 73036 0 79600 31199 86177 0 117376
9th plan 0 0 0 0 3234 1504 0 4738 751 409 0 1160 29345 20033 0 49378 8687 88306 0 96993 42017 110252 0 152269
10th plan 0 0 0 0 4368 1504 0 5872 1775 409 0 2184 48708 24730 0 73438 9444 105185 0 114629 64295 131828 0 196123
11th Plan 0 0 0 0 5948 1504 1980 9432 4839 411 0 5250 71023 30191 5605 106819 10140 125010 830 135980 91950 157116 8415 257481
12th Plan 6124 0 0 6124 5948 1504 1980 9432 25465 1177 4598 31240 92482 48240 17065 157787 11014 151276 978 163268 141033 202197 24621 367851
13th Plan (Up
to Mar2019)6124 0 0 6124 5948 1504 1980 9432 33692 1512 6605 41809 101335 58238 21173 180746 11734 162552 1010 175296 158833 223806 30768 413407
13th Plan (Up
to Apr-19)6124 0 0 6124 5948 1504 1980 9432 33745 1512 6605 41862 101335 58258 21173 180766 11734 162953 1010 175697 158886 224227 30768 413881
27150 600 MW of 132 kV Inter-Regional power transmission capacity links which are operated radially from time to time is not added in the total
75050
47900
24000
99050
30
Grand Total
Note - The figure upto the end of 10th plan in for stringing progress including the lines not commissioned Now only commissioned lines are reckoned Accordingly the figure for 10th plan (end) may read
as 187555 after adjusting with (-) 10852 Ckm
Inter-regional Power Transfer Capacity (MW)
plusmn 800 kV HVDC plusmn 500 kV HVDC 765 kV 400 kV 220 kV
IR addition in 12th
Plan (up to March
2017)
Inter-regional
Transmission
Capacity at the end
of Plan Period 2017-
22 (as on April19)
IR at the end of 11th
PlanIR at the end of 12th
Plan
IR Capacity Addition
at the end of Plan
Period 2017-22 (Till
April 19)
2004-05 27800
2005-06 28100
2006-07 30200
2007-08 33000
2008-09 35500
2009-10 36700
2010-11 38700
2011-12 41756
2012-13 45460
2013-14 48940
2014-15 53040
2015-16 54590
2016-17 57430
2017-18 60800
2018-19 62890
Year
2005-06
2006-07
2007-08
2008-09
2009-10
2010-11
2011-12
2012-13
2013-14
2014-15
2015-16
2016-17
2017-18
2018-19
2004-05 254 209 7568
2005-06 260 221 7636
2006-07 276 227 7423
2007-08 293 239 7727
2008-09 340 263 8713
2009-10 355 268 8870
2010-11 398 303 11975
2011-12 455 330 13514
2012-13 501 376 14867
2013-14 518 175
2014-15 520
Source- PFC Reports on the performance of State Power Utilities 31
1181
7335
7786
91441
8188
88363
957
1010
1075
1122
1149
(GrossGen+ Net Import) Mid-year population Provisional
5 Average cost of power supply amp average realization ( paiseKWH )
Yearcost of supply
(paiseunit)
Realization(paiseunit)
Including AgricultureOnly
Agriculture
6719
7171
3 All India yearly Coal Consumption for Power Generation (Utilities)
YEARCoal Consumption
Million Tonnes
4 All India Annual per Capita consumption of Electricity Since 2006
Per Capita Consumption ( kWh)
6314
Sl
NoExecuting Agency
Installed
Capacity (MW)Cost (Rs crore)
Date of
Clearance
32
Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as
Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received
from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made
available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified
villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is
independent of the earlier published reports
No Hydro Electric Project has been issued concurrenceAppraisal letter by CEA during April 2019
7 Status of Hydro Schemes Cleared by the CEA in Apr-2019
Name of Scheme
1999-002000-01
297594
010408 to 310309010409 to 310310
10th Plan
2005-062006-07
322968331020
6 Growth Of Rural Electrification amp Pumpsets Energisation
Plan Year
9th Plan2002-03
134092626
4111
Pump Sets Energised Villages Electricfied (Nos)
2001-02
284064367244
1218
27801997-981998-99
3207
482864
12632
1576036
4451722594
15455554
2314176
397343611750
2093311060316074
65109527813884
46708
18423975
499150
2003-042004-05
5743
9769
Cumu upto End of 10th Plan
010407 to 310308
010410 to 310311557976840909
010411 to 310312
412667
86293726
No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification
since 2004-05
65291374575 296361511th Plan
Cumu upto End of 11th Plan
596556 21212860
557439Cummulative up to end of 12th Plan
SN Contents Page
1 Rate of sale of power for the year 2016-17 33-41
RATE OF SALE OF POWER FOR THE YEAR 2016-17
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) NORTHERN REGION
CENTRAL SECTOR
BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 18000 66900 19800
CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 54000 222400 21600
CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 30000 144400 19600
CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 23100 91700 42600
PARBATI - III HPS NHPC LTD HYDRO-HYDRO 52000 68200 54800
DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 28000 95600 30000
CHUTAK NHPC LTD HYDRO-HYDRO 4400 22000 79800
DULHASTI HPS NHPC LTD HYDRO-HYDRO 39000 228000 56400
SALAL HPS NHPC LTD HYDRO-HYDRO 69000 342300 11000
TANAKPUR HPS NHPC LTD HYDRO-HYDRO 9420 43000 29600
URI HPS -I NHPC LTD HYDRO-HYDRO 48000 280300 16000
URI HPS - II NHPC LTD HYDRO-HYDRO 24000 147300 48600
NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 4500 24600 88200
SEWA - II NHPC LTD HYDRO-HYDRO 12000 47100 43400
ANTA CCPP NTPC LTD THERMAL-GASN 41930 67539 32400
AURAIYA CCPP NTPC LTD THERMAL-GASN 66336 53501 39100
BADARPUR TPS NTPC LTD THERMAL-COAL 70500 159153 44800
DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 84000 296170 42300
DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 98000 526686 46300
DADRI CCPP NTPC LTD THERMAL-GASHSD 82978 227469 33000
FARIDABAD CCPP NTPC LTD THERMAL-GASN 43159 115577 30800
RIHAND STPS I NTPC LTD THERMAL-COAL 100000 596766 24500
RIHAND STPS II NTPC LTD THERMAL-COAL 100000 737069 24600
RIHAND STPS III NTPC LTD THERMAL-COAL 100000 706546 30600
SINGRAULI STPS NTPC LTD THERMAL-COAL 200000 1394068 20400
TANDA TPS NTPC LTD THERMAL-COAL 44000 295438 40800
UNCHAHAR TPS I NTPC LTD THERMAL-COAL 42000 256454 39800
UNCHAHAR TPS II NTPC LTD THERMAL-COAL 42000 273577 38900
UNCHAHAR TPS III NTPC LTD THERMAL-COAL 21000 142780 43000
KOLDAM NTPC LTD HYDRO-HYDRO 80000 363260 43600
NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 303575 25841
RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 108000 668677 35374
NJHPS SJVNL HYDRO-HYDRO 150000 699496 23820
RAMPUR HPS SJVNL HYDRO-HYDRO 41202 195982 32260
TEHRI HPP THDC HYDRO-HYDRO 100000 272543 51800
KOTESHWAR HEP THDC HYDRO-HYDRO 40000 106244 53400
IGSTPS JHAJJAR ARAVALI P CPL THERMAL-COAL 150000 510429 49490
NEYVELI BARSINGSAR NEYVELI LIG CORP LTD THERMAL-LIG 25000 127520 38040
STATE SECTOR
PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 21000 14222 48200
PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 21000 19205 48400
PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 25000 102257 42600
PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 25000 62107 41800
DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 60000 312213 41000
RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 120000 35767442200
WYC HYDEL STATION HPGCL HYDRO-HYDRO 6240 20365 24900
GIRI POWER HOUSE HPSEB HYDRO-HYDRO 6000 13958 7600
ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 1695 5467 11900
BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 12000 18528 6700
GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 2250 7462 22500
BASSI POWER HOUSE HPSEB HYDRO-HYDRO 6600 29649 7500
BINWA POWER HOUSE HPSEB HYDRO-HYDRO 600 2749 19300
ANNEXURE-I
RATE OF SALE OF POWER FOR THE YEAR 2016-2017
Page 33
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) GAJ POWER HOUSE HPSEB HYDRO-HYDRO 1050 2914 26700
BANER POWER HOUSE HPSEB HYDRO-HYDRO 1200 2864 16200
HOLI POWER HOUSE HPSEB HYDRO-HYDRO 300 616 22500
THIROT POWER HOUSE HPSEB HYDRO-HYDRO 450 1126 22500
KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 1200 3064 22500
LARJI POWER HOUSE HPSEB HYDRO-HYDRO 12600 53677 23700
NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 250 750 31000
CHABA POWER HOUSE HPSEB HYDRO-HYDRO 175 465 23300
RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 150 101 13400
SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 200 000 22500
KILLAR HPSEB HYDRO-HYDRO 030 050 22500
BHABA AUGUMENP H HPSEB HYDRO-HYDRO 450 1276 22500
BS CHAMBA HPSEB HYDRO-HYDRO 045 099 19500
GUMMA HPSEB HYDRO-HYDRO 300 423 22500
GAS TURBINE POWER STATION IPGCL THERMAL-GAS 27000 67233 39300
PPS-I PPCL THERMAL-GAS 33000 175905 38300
PPS-III PPCL THERMAL-GAS 137120 196879 36100
LOWER JHELUM JampKPDD HYDRO-HYDRO 10500 60214 5100
UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 2260 10514 6300
UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 10500 44202 8500
GANDHARBAL JampKPDD HYDRO-HYDRO 1500 8925 4700
KARNAH MPH JampKPDD HYDRO-HYDRO 200 1122 31000
CHENANI I JampKPDD HYDRO-HYDRO 2330 10892 6600
CHENANI II JampKPDD HYDRO-HYDRO 200 1188 9300
CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 750 3634 14200
IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 375 2108 18500
IGO MERCHELLONG JampKPDD HYDRO-HYDRO 300 1572 29700
PAHALGAM MHP JampKPDD HYDRO-HYDRO 450 1713 32900
MARPACHOO JampKPDD HYDRO-HYDRO 075 375 29800
HAFTAL JampKPDD HYDRO-HYDRO 100 483 28700
SANJAK JampKPDD HYDRO-HYDRO 126 441 36000
SEWA-III JampKPDD HYDRO-HYDRO 900 3273 20200
BHADERWAH JampKPDD HYDRO-HYDRO 150 935 8900
BAZGO JampKPDD HYDRO-HYDRO 030 108 33300
SUMOOR JampKPDD HYDRO-HYDRO 010 045 35400
HUNDER JampKPDD HYDRO-HYDRO 040 176 26200
STAKNA JampKPDD HYDRO-HYDRO 400 1933 4100
KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 124000 662879 31360
SURATGARH TPS RRVUNL THERMAL-COAL 150000 402328 41730
CHHABRA TPS 1amp 2 RRVUNL THERMAL-COAL 50000 305946 36700
CHHABRA TPS 3 RRVUNL THERMAL-COAL 25000 151536 36700
CHHABRA TPS 4 RRVUNL THERMAL-COAL 25000 155896 36700
RAMGARH GT POWER PROJECT RRVUNL THERMAL-COAL 22050 43177 41800
RAMGARH GAS T P PROJECT 3 RRVUNL THERMAL-GAS 5000 93615 41800
DHOLPUR C C POWER PROJECT RRVUNL THERMAL-R-LNG 33000 9486 46110
MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 14000 20855 34192
MINI MICRO HYDEL (MMH) P S RRVUNL HYDRO-HYDRO 2385 851 37800
KALISINDH TPP 1 RRVUNL THERMAL-COAL 60000 341543 45000
KALISINDH TPP 2 RRVUNL THERMAL-COAL 60000 211588 45000
KHARA HEP UPJVNL HYDRO-HYDRO 7200 26654 7200
MATATILLA HEP UPJVNL HYDRO-HYDRO 3060 12219 6500
OBRA HEP UPJVNL HYDRO-HYDRO 9900 21517 6300
RIHAND UPJVNL HYDRO-HYDRO 30000 57369 5500
ANPARA A TPS UPRVUNL THERMAL-COAL 63000 317536 27000
ANPARA B TPS UPRVUNL THERMAL-COAL 100000 705605 22700
ANPARA D UPRVUNL THERMAL-COAL 100000 300158 39800
HARDUAGANJ TPS UPRVUNL THERMAL-COAL 16500 45817 49200
HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 50000 304389 46600
OBRA A TPS UPRVUNL THERMAL-COAL 28800 13158 34000
OBRA B TPS UPRVUNL THERMAL-COAL 100000 328124 21900
Page 34
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) PANKI TPS UPRVUNL THERMAL-COAL 21000 66488 50300
PARICHHA TPS UPRVUNL THERMAL-COAL 22000 38762 49400
PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 42000 231931 45600
PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 50000 276722 50400
CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 24000 70845 8290
CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 14400 75366 8390
DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 3375 9595 12080
DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 5100 18701 10520
KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4140 17359 12330
KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 12000 33001 9420
KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 3000 11953 8320
TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 9000 33983 12460
MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 30400 124510 16110
RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 19800 17897 10550
MPUR UTTARAKHAND JVNL HYDRO-HYDRO 930 5121 19200
PATHRI UTTARAKHAND JVNL HYDRO-HYDRO 2040 11636 14200
GALOGI UTTARAKHAND JVNL HYDRO-HYDRO 300 648 12500
PRIVATE SECTOR
MGTPP CLP INDIA PVT LTD THERMAL-COAL 132000 268902 41940
SHRINAGAR HEP ALAKNANDA HPCL HYDRO-HYDRO 33000 127414 48800
GAMA INFRAPROP CCPP GAMA INFRAPROP PVT THERMAL-GAS 22500 52686 47000
PPGCL (BARA) JP POWER VENTURES LTD THERMAL-COAL 198000 448200 38500
MALANA HEP MALANA PCL HYDRO-HYDRO 8600 26354 29792
MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 10000 30369 32580
ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 19200 56347 36079
KASHANG HEP H P PCL HYDRO-HYDRO 19500 5034 29200
BASPA-II HEP HBPCL HYDRO-HYDRO 30000 132769 13600
KARCHAM WANGTOO HEP HBPCL HYDRO-HYDRO 100000 434386 36600
RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 108000 582600 43700
RITHALA COMBI CY POWER PLANT TATA POWER DDL THERMAL-GAS 9480 000 11900
RAJPURA TPS NABHA POWER LTD THERMAL-GAS 140000 901484 39000
TALWANDI SABO POWER LTD TALWANDI SABO POWER LTD THERMAL-COAL 198000 636040 49548
ROJA THERMAL POWER STATION ROJA POWER SCL THERMAL-COAL 120000 727200 43400
KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 34400 63400
BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 36000 62600
MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 38200 60800
UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 37900 61500
KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 42300 58800
LALITPUR PGCL BAJAJ ENERGY PVT LTD THERMAL-COAL 198000 359400 47300
PRAYAGRAJ PGCL PRAYAGRAJ PGCL THERMAL-COAL 132000 448200 38595
KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 132000 783182 33438
WESTERN REGION
CENTRAL SECTOR
INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 100000 325333 23892
OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 52000 141663 34001
GANDHAR CCPP NTPC LTD THERMAL-GAS 65739 221924 28700
KAWAS CCPP NTPC LTD THERMAL-GASN 65620 167929 27000
KORBA I amp II NTPC LTD THERMAL-COAL 210000 1499171 20500
KORBA III NTPC LTD THERMAL-COAL 50000 358746 26600
SIPAT STPS I NTPC LTD THERMAL-COAL 198000 1479902 26800
SIPAT STPS II NTPC LTD THERMAL-COAL 100000 766549 26500
VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 126000 693142 25800
VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 100000 608781 23800
VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 100000 673475 27600
VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 100000 655924 32900
VINDHYACHAL STPS V NTPC LTD THERMAL-COAL 50000 328265 31700
MOUDA I NTPC LTD THERMAL-COAL 100000 343130 44500
MOUDA Ii NTPC LTD THERMAL-COAL 66000 40637 39900
RATNAGIRI GAS amp POWER PVT LTD RGPPL THERMAL-GAS 196708 442485 47000
KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 000 24729
TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 32000 201227 10740
Page 35
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 365122 19069
TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 787444 29324
STATE SECTOR
GSEG-HAZIRA15610 MW GUJARAT S ENEGEN LTD THERMAL-GAS 15610 1805 28200
GSEG-HAZIRA35143 MW GUJARAT S ENEGEN LTD THERMAL-GAS 35130 22276 51300
GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 21978 51800
AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 13929 26100
KORBA TPS EAST CSPGCL THERMAL-COAL 44000 198673 33880
DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 365808 27570
KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 316500 30420
HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 532878 19410
CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 515 58300
MTTPS CHAMPA U-I CSPGCL THERMAL-COAL 50000 220376 39000
MTTPS CHAMPA U-II CSPGCL THERMAL-COAL 50000 23709 10000
SHP GANGREL CSPGCL HYDRO-HYDRO 1000 2350 36790
BANGO HEP CSPGCL HYDRO-HYDRO 12000 14662 8900
MHP KORBA WEST CSPGCL HYDRO-HYDRO 170 859 38190
SIKASAR HEP CSPGCL HYDRO-HYDRO 700 418 26870
DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8843 74500
DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 19446 51500
GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 66388 71600
GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127488 41300
KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 96072 43900
KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 29841 56400
SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 184966 58800
UKAI 1-5 GSECL THERMAL-COAL 85000 204891 46900
UKAI TPS 6 GSECL THERMAL-COAL 50000 284448 48200
WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 271999 58300
WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 82808 44100
KADANA HPS GSECL HYDRO-HYDRO 24200 34433 16800
UKAI HPS GSECL HYDRO-HYDRO 30500 40585 6100
TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 123000 11500
BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 8900 10900
BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 7200 27500
JHINNA HPS MPPGCL HYDRO-HYDRO 2000 9700 18500
RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 44300 3400
GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 17300 4600
SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 4100 16900
MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 14600 27000
PENCH HPS MPPGCL HYDRO-HYDRO 16000 23700 8100
RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 3000 16900
AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 134400 35100
SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 283800 38700
SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 344600 34300
SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 111600 61600
SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 211800 58000
SSTPS PH-I MPPGCL THERMAL-COAL 120000 233100 84300
BHUSAWAL TPS MSPGCL THERMAL-COAL 142000 566258 51100
CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1365682 33700
KHAPERKHEDA MSPGCL THERMAL-COAL 134000 706207 39100
KORADI TPS MSPGCL THERMAL-COAL 62000 443206 42000
NASIK TPS MSPGCL THERMAL-COAL 63000 297275 47000
PARLI TPS MSPGCL THERMAL-COAL 113000 175934 71600
PARAS MSPGCL THERMAL-COAL 50000 267931 38700
URAN CCPP MSPGCL THERMAL-GAS 67200 320330 30600
KOYANA MSPGCL HYDRO-HYDRO 195600 328155 13100
SMALL HYDRO POWER PLANTS MSPGCL HYDRO-HYDRO 45400 93062 30500
BHIRA MSPGCL HYDRO-HYDRO 8000 10046 8400
TILLARI MSPGCL HYDRO-HYDRO 8900 10584 3100
SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 233298 20500
SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 87633 20500
PRIVATE SECTOR
Page 36
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 81282 46750
JNSTPP(JAYPEE NIGRIE) JP POWER VENTURES LTD THERMAL-COAL 132000 726695 29310
MB POWER MB POWER THERMAL-COAL 120000 345632 38310
ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 754922 28671
ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 780761 23495
ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 198000 1263784 32090
ADANI POWER MAHARA ADANI POWER LTD THERMAL-COAL 330000 1666191 34124
AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 170065 36827
SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 252035 45129
ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 458551 36000
ESSAR POWER MP LTD ESSAR POWER MP LTD THERMAL-COAL 60000 243040 28600
VEDANTA LTD (P P -I) VEDANTA LTD THERMAL-GAS 3000 15044 24000
VEDANTA LTD (P P -II) VEDANTA LTD THERMAL-GAS 3000 21293 24000
PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 8234600 24000
165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 5850 64390
145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 68717 40349
SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 132655 28776
SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 144686 38567
MUNDRA UMPPCOASTAL GUJARAT POWER
LTD THERMAL-IMP COAL 400000 2530300
23900
LANCO AMARKANTAK TPP PATHADIH
U-ILANCO AMARKAN POWER LTD THERMAL-COAL 30000 195500
29200
LANCO AMARKANTAK TPP PATHADIH
U-IILANCO AMARKAN POWER LTD THERMAL-COAL 30000 206900
27600
BARADARHA TPS D B POWER LTD THERMAL-COAL 120000 677373 29200
JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 405000 28900
JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 453000 40500
DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 339437 40700
TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 293400 44000
TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 137200 37000
TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 174900 44000
BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 92900 14100
BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23700 34300
KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 27600 48300
CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2530300 23900
BHANDARDRA HEP -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 2475 54900
SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 161400 26500
SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 445000 39000
SOTHERN REGION
CENTRAL SECTOR
NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 325699 54820
NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 305532 39880
NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 998805 38510
NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 113016 54070
NEYVELI TAMILNADU POWER LTD JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 625274 42200
VALLUR TPS NTPC TECL THERMAL-COAL 150000 856438 42350
R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 1493 84300
RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1502919 29400
RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 341291 31800
SIMHADRI I NTPC LTD THERMAL-COAL 100000 688382 36800
SIMHADRI II NTPC LTD THERMAL-COAL 100000 663657 43400
KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 593110 31324
MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 291625 21764
KKNPP-1 amp 2 NPCIL NUCLEAR-NUCLEAR 200000 572609 40948
MINICOY LAKSHADEEP THERMAL-DIESEL 340 770 29600
KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1097 29600
AMINI LAKSHADEEP THERMAL-DIESEL 265 509 29600
ANDROTT LAKSHADEEP THERMAL-DIESEL 219 524 29600
KALPENI LAKSHADEEP THERMAL-DIESEL 175 356 29600
AGATTI LAKSHADEEP THERMAL-DIESEL 195 658 29600
KADMAT LAKSHADEEP THERMAL-DIESEL 190 414 29600
KILTAN LAKSHADEEP THERMAL-DIESEL 150 269 29600
CHETLET LAKSHADEEP THERMAL-DIESEL 100 139 29600
BITRA LAKSHADEEP THERMAL-DIESEL 043 024 29600
BANGARAM LAKSHADEEP THERMAL-DIESEL 018 009 29600
Page 37
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) STATE SECTOR
Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 721811 46500
Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 50000 336142 46500
RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 237358 46500
RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 239926 46500
RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 124500 46500
SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 62109 46500
UPPER SILERU APGENCO HYDRO-HYDRO 24000 33000 46500
LOWER SILERU APGENCO HYDRO-HYDRO 46000 81066 46500
DONKARAI APGENCO HYDRO-HYDRO 2500 6007 46500
PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 1262 46500
CHETTIPETA APGENCO HYDRO-HYDRO 100 214 46500
MUCHKUND APGENCO HYDRO-HYDRO 12000 37571 46500
NAGARJUNASAGAR RCPH APGENCO HYDRO-HYDRO 9000 606 46500
TUNGABHADRA HES amp HAMPI(AP
Share)
APGENCO HYDRO-HYDRO 7200 6100 46500
KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 352232 42600
KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 288131 32500
KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 319272 46500
RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 40073 44300
KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 308317 46000
KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 308963 51300
SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 61004 76600
NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 17960 75300
PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 20873 58300
POCHAMPAD-I TSPGENCO HYDRO-HYDRO 2700 5455 29800
POCHAMPAD-II TSPGENCO HYDRO-HYDRO 900 1932 40700
NIZAMSAGAR TSPGENCO HYDRO-HYDRO 1000 1126 53400
RAICHUR TPS 1 to 7 KPCL THERMAL-COAL 147000 890866 43800
RAICHUR TPS 8 KPCL THERMAL-COAL 25000 159523 48200
BELLARI TPS 1 KPCL THERMAL-COAL 50000 318679 51100
BELLARI TPS 2 KPCL THERMAL-COAL 50000 232347 55600
BELLARI TPS 3 KPCL THERMAL-COAL 70000 47565 34400
BHADRA PH KPCL HYDRO-HYDRO 3920 2369 45900
GERUSUPPA PH KPCL HYDRO-HYDRO 24000 26990 22000
GHAT PRABHA HEP KPCL HYDRO-HYDRO 3200 4777 25300
KADRA HPS KPCL HYDRO-HYDRO 15000 16889 26800
NAGJHARI KPCL HYDRO-HYDRO 90000 155159 9800
KODASALLI DPH KPCL HYDRO-HYDRO 12000 14854 19200
MUNIRA+MGH+SPH+SPH KPCL HYDRO-HYDRO 22640 48211 7900
SHARAVATHY HPS KPCL HYDRO-HYDRO 108550 276215 5400
ALMATTI DPH KPCL HYDRO-HYDRO 29000 39611 24600
VARAHI UGPH KPCL HYDRO-HYDRO 46000 71368 15600
IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 17196 15300
IDUKKI HPS KSEB HYDRO-HYDRO 78000 137905 15300
KAKKAD HPS KSEB HYDRO-HYDRO 5000 13063 15300
KALLADA HPS KSEB HYDRO-HYDRO 1500 4436 15300
KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 46544 15300
KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 635 15300
LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 30822 15300
MALANKARA HPS KSEB HYDRO-HYDRO 1050 2474 15300
MATTUPETTY KSEB HYDRO-HYDRO 200 230 15300
MALAMPUZHA KSEB HYDRO-HYDRO 250 063 15300
CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 864 15300
URUMI ST I amp II KSEB HYDRO-HYDRO 615 903 15300
LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 248 15300
NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7765 19625 15300
PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 16601 15300
PANNIAR HPS KSEB HYDRO-HYDRO 3240 6217 15300
PORINGALKUTHU KSEB HYDRO-HYDRO 3600 10052 15300
PORINGALKUTHU LBE KSEB HYDRO-HYDRO 1600 9438 15300
PEPPARA KSEB HYDRO-HYDRO 300 395 15300
POOZHITHODE KSEB HYDRO-HYDRO 480 1045 15300
Page 38
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) PEECHI KSEB HYDRO-HYDRO 125 040 15300
RANI-PERUNADU KSEB HYDRO-HYDRO 400 585 15300
SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 79783 15300
SENGULAM HPS KSEB HYDRO-HYDRO 5120 11558 15300
SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 16711 15300
VILANGAD KSEB HYDRO-HYDRO 750 1578 15300
BARAPOLE KSEB HYDRO-HYDRO 1500 1932 15300
VELLATHOOVAL KSEB HYDRO-HYDRO 360 305 15300
CHIM0NY KSEB HYDRO-HYDRO 250 156 15300
ADYANPARA KSEB HYDRO-HYDRO 350 501 15300
BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 554 15300
KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 3801 15300
KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 23132 32800
ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 14416 62280
METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 523970 62280
METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 321270 62280
NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 336575 62280
NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 591240 62280
TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 508966 62280
KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 30897 62280
VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 18720 90699 62280
KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 33593 62280
BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 1047 62280
PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 1250 62280
PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 330 62280
MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 4897 62280
MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 032 62280
KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15681 62280
KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 40608 62280
KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 21342 62280
KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 4717 62280
KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4322 62280
KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2399 62280
METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 4416 62280
METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 8035 62280
BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2187 62280
BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2359 62280
BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2511 62280
BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 1949 62280
BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 1819 62280
POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 172 62280
SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 241 62280
MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 026 62280
THIRUMOORTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 136 62280
PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 9309 62280
VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 353 62280
SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 4192 62280
PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 6571 62280
SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 1186 62280
SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6319 62280
ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 6122 62280
KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 28674 62280
SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 18381 62280
SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 4258 62280
KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 12680 62280
KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4201 62280
ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 000 62280
PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 19175 62280
AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 078 62280
BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 504 62280
BHAVANI KATTALAI (BKB)(IIIampIII BB I amp II)TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 5847 62280
PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 000 62280
Page 39
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) SRI DAMODARAM STPS APPDCL THERMAL-COAL 160000 808108 36300
PRIVATE SECTOR
KARUPPUR TANJORE LANCO TANJORE PCL THERMAL-GAS 12000 48096 28770
SIMHAPURI ENERGY LTD SIMHAPURI ENERGY LTD THERMAL-COAL 60000 143900 39100
JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 7111 45500
SBU 1 JSW ENERGY LTD
VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 26000 159100
43300
SBU 2 JSW ENERGY LTD
VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 60000 247900
42800
LANCO KPLLANCO KONDAPALLI POWER
LTDTHERMAL-GAS 36814 85060
25776
LANCO KPL STG -IILANCO KONDAPALLI POWER
LTDTHERMAL-GAS 36600 12979
46330
LANCO KPL STG -IIIALANCO KONDAPALLI POWER
LTDTHERMAL-GAS 37100 85710
46330
LANCO KPL STG -III BLANCO KONDAPALLI POWER
LTDTHERMAL-GAS 37100 43639
46330
HINDUJA NATIONAL PCL HINDUJA NATIONAL PCL THERMAL-COAL 104000 303000 38200
MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 121164 49940
UDUPI POWER COR LTD ADANI POWER LTD THERMAL-COAL 120000 754613 42500
SPECTRUM POWER GENERATION
LTD SPECTRUM PG LTD THERMAL-GASN 20525 9256812
34952
TAQA NEYVELI POWER COM PVT
LTD TAQA NEYVELI THERMAL-LIG 25000 5840
34500
ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 251000 51000
ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 207860 36800
GMR VEMAGIRI POWER GENERATION
LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 30117
46450
EASTERN REGION
CENTRAL SECTOR
MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 64675 53113
MTPS STAGE - II KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 39000 1432 69138
BOKARO `B` TPS DVC THERMAL-COAL 63000 145670 31539
MEJIA TPS U 1-3 DVC THERMAL-COAL 63000 348298 31552
MEJIA TPS U 4 DVC THERMAL-COAL 21000 116099 34997
MEJIA TPS U 5-6 DVC THERMAL-COAL 50000 276427 35976
MEJIA TPS U 7-8 DVC THERMAL-COAL 100000 552854 36991
DURGAPUR STEEL TPS DVC THERMAL-COAL 100000 665550 39323
DURGAPUR TPS DVC THERMAL-COAL 21000 59270 35416
RAGHUNATHPUR TPS DVC THERMAL-COAL 120000 201650 35326
MAITHON HYDEL STA DVC HYDRO-HYDRO 6320 12200 17984
CHANDRAPURA TPSU1-3 DVC THERMAL-COAL 42000 257610 35095
CHANDRAPURA TPSU7-8 DVC THERMAL-COAL 50000 306673 34987
KODERMA TPS DVC THERMAL-COAL 100000 380180 38131
PANCHET HPS DVC HYDRO-HYDRO 8000 13360 17984
TILLAYA HPS DVC HYDRO-HYDRO 400 1410 17984
RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34700 35400
TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 277300 23200
TLDP -III NHPC LTD HYDRO-HYDRO 13200 55400 62000
TLDP -IV NHPC LTD HYDRO-HYDRO 16000 60300 25600
FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 957219 33700
FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 308943 41000
BONGAINGAON TPS NTPC LTD THERMAL-COAL 25000 153663 58600
KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 542277 34200
KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 942591 34200
BARH-II NTPC LTD THERMAL-COAL 132000 728021 44500
TALCHER TPS NTPC LTD THERMAL-COAL 46000 335521 30100
TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 702319 25600
TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1436521 24700
STATE SECTOR
BTPS(RampM) BIHAR STATE PGCL THERMAL-COAL 22000 12142 39700
BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 98331 10602
HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 50593 9482
CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 19689 2605
RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 53192 6033
UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 147208 14637
Page 40
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 60353 4519
IB TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 288567 25000
J P H GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 210 038 61100
MEYONG CHU GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 400 1086 61100
TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 122667 38200
DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 214339 43321
KOLAGHAT THERMAL POWER
STATION
WEST BENGAL PDCL THERMAL-COAL 126000 538269 31603
BAKRESHWAR THERMAL POWER
PLANT
WEST BENGAL PDCL THERMAL-COAL 105000 634876 32154
BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 45000 166855 33299
SANTHALDIH THERMAL POWER
STATION
WEST BENGAL PDCL THERMAL-COAL 50000 336442 34932
SAGARDIGHI THERMAL POWER
PROJECT
WEST BENGAL PDCL THERMAL-COAL 160000 423121 34705
JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 20344 68900
RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 24559 68900
TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 4623 68900
PURULIA PUMPED STORAGE
PROJECT
WEST BENGAL SEDCL HYDRO-HYDRO 90000 108816 68900
MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2768 68900
PRIVATE SECTOR
CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 49474 20230
CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 555500 70200
HALDIA ENERGY HALDIA ENERGY LTD THERMAL-COAL 60000 371000 50400
DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3688 63400
KAMALANGA TPS GMR KAMALANGA ENERGY LTD THERMAL-COAL 105000547670
33300
ADHUNIK POWER U-1 ADHUNIK POWER THERMAL-COAL 27000 158 44060
ADHUNIK POWER U-2 ADHUNIK POWER THERMAL-COAL 27000 168 44250
VL-JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 332800 23622
JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 43000 45250
JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 71700 37030
JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 70700 35920
JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 71100 38870
JOJOBERA UNIT 5 TATA POWER COM LTD THERMAL-COAL 12000 79300 44560
JOJOBERA UNIT 6 TATA POWER COM LTD THERMAL-WHR 12000 83700 12840
IEL KALINGANAGAR U-I TATA POWER COM LTD THERMAL-WG 6750 33400 22500
IEL KALINGANAGAR U-II TATA POWER COM LTD THERMAL-WG 6750 34800 22500
MAITHON UNIT 1 amp 2 TATA POWER COM LTD THERMAL-COAL 105000 678000 36100
HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 27500 24340
HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 28400 24340
HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 15800 24310
NORTH EASTERN REGION
CENTRAL SECTOR
LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 74100 36600
AGARTALA GT NEEPCO THERMAL-GAS 13500 88611 27210
ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 153111 32310
DOYANG HEP NEEPCO HYDRO-HYDRO 7500 25598 49801
KOPILI HEP NEEPCO HYDRO-HYDRO 20000 98186 11491
KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 19582 20237
KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 10310 17968
RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 124093 22945
TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 10100 17344 39000
STATE SECTOR
HYDRO POWER (122 Stns) ITANAGAR GOVT OF ARUNACHAL
PRADESHHYDRO-HYDRO 6971 6217270
24600
KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39514 17337
LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 82327 36810
NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 33318 48290
MYNTRIANG SHEP ST II ASSAM POWER GENCO HYDRO-HYDRO 300 567 35776
LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 9130 49200
LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 012 49200
DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 022 49200
TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 000 49200
UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 4990 16000
UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 6476 37000
UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 16494 14600
UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 3600 9556 15000
SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 758 8000
MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44070 44800
KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 154 41400
TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 091 41400
MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 411 41400
MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 394 41400
KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 760 41400
SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 3264 41400
LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 044 41400
BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 18953 28000
ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 43585 28200
GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 4080 11100
Note
LIG Lignite N Naptha WHR Waste Heat Recovery
Page 41
आकड़ मममलयन यननट नट Figures in MU net
ऊरजा आवशयकतज ऊरजा उपलबधतज ऊरजा आवशयकतज ऊरजा उपलबधतजपरणाली System Energy Requirement Energy Supplied Energy Requirement Energy Supplied
कषतर Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )
चडीगढ़ Chandigarh 96 96 0 00 1561 1561 0 00
दिलली Delhi 1931 1930 1 00 32299 32282 17 01
हरियजणज Haryana 3658 3658 0 00 53665 53665 0 00
दहमजचल परिश Himachal Pradesh 832 830 2 02 9850 9618 232 24
रमम कशमीि Jammu amp Kashmir 1767 1414 353 200 19593 15868 3725 190
परजब Punjab 3585 3585 0 00 55288 55275 13 00
िजरसथजन Rajasthan 6774 6770 4 01 79826 79637 189 02
उतति परिश Uttar Pradesh 8754 8691 63 07 117101 116118 984 08
उततिजखड Uttarakhand 1067 1067 0 00 13845 13753 92 07
उततरी कषतर Northern Region 28464 28041 423 15 383028 377776 5251 14
छततीसगढ़ Chhattisgarh 2464 2457 8 03 26130 26076 54 02
गरिजत Gujarat 9890 9890 0 00 116588 116572 15 00
मधय परिश Madhya Pradesh 6236 6236 0 00 75667 75665 2 00
महजिजषटर Maharashtra 13631 13631 0 00 158285 158148 137 01
िमन औि दिउ Daman amp Diu 221 221 0 00 2557 2557 0 00
िजिि व नगि हवली Dadra amp Nagar Haveli 553 553 0 00 6317 6317 0 00
गोवज Goa 362 362 0 00 4283 4280 3 01
पशचिमी कषतर Western Region 33357 33349 8 00 389827 389615 212 01
आनधर परिश Andhra Pradesh 6072 6071 1 00 63735 63677 58 01
तलगजनज Telangana 6930 6929 1 00 66697 66635 62 01
कनजाटक Karnataka 7614 7612 1 00 71759 71690 69 01
किल Kerala 2489 2488 1 00 25029 24911 118 05
तममल नजड Tamil Nadu 10247 10245 2 00 109375 109273 102 01
पडचिी Puducherry 252 251 1 04 2761 2751 10 03
लकष-दवीप Lakshadweep 4 4 0 0 46 46 0 0
दकषकषणी कषतर Southern Region 33605 33597 8 00 339355 338938 417 01
बबहजि Bihar 2319 2318 1 00 30052 29827 225 07
िजमोिि घजटी ननगम DVC 1773 1772 1 00 22365 21995 369 17
झजिखणड Jharkhand 698 697 1 01 8682 8461 221 25
ओडडशज Odisha 2583 2582 1 00 31810 31781 30 01
पशशचम बगजल West Bengal 4585 4584 2 00 52237 52078 159 03
मसशककम Sikkim 41 41 0 00 513 512 0 01
अडमजन-ननकोबजि Andaman- Nicobar 29 27 2 67 346 323 23 67
परवी कषतर Eastern Region 11999 11995 5 00 145658 144654 1004 07
अरणजचल परिश Arunachal Pradesh 61 60 0 06 864 855 9 10
असम Assam 680 656 23 34 9532 9204 328 34
मणणपि Manipur 68 68 1 09 916 906 10 11
मघजलय Meghalaya 173 173 0 03 1955 1953 1 01
ममज़ोिम Mizoram 50 49 0 09 668 661 8 12
नजगजलड Nagaland 58 57 1 20 902 809 93 103
बिपिज Tripura 150 150 0 00 1859 1837 21 11
उततर-परवी कषतर North-Eastern Region 1240 1214 26 21 16696 16225 471 28
समपणण भारत All India 108665 108196 469 04 1274564 1267209 7355 06
Note The revised data for March 2019 is not avaliable
Excludes energy exported to Bangladesh
राजयState
ऊराण वरवदयत आपरत ण शथिरत ररपोरण (परवाणरवलोकन) Energy Power Supply Position Report (Provisional)
25
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
Energy not Supplied Energy not Supplied
मािण2019 March2019 अपरल2018 -मािण2019 April2018 to March2019
ऊरजा पनत ा म कमी ऊरजा पनत ा म कमी
अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met
कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )
चडीगढ़ Chandigarh 223 223 0 00 369 369 0 00
दिलली Delhi 4016 4016 0 00 7016 7016 0 00
हरियजणज Haryana 6544 6544 0 00 10270 10270 0 00
दहमजचल परिश Himachal Pradesh 1683 1683 0 00 1700 1700 0 00
रमम कशमीि Jammu amp Kashmir 3277 2622 655 200 3277 2622 655 200
परजब Punjab 6564 6564 0 00 12638 12638 0 00
िजरसथजन Rajasthan 11885 11885 0 00 13276 13276 0 00
उतति परिश Uttar Pradesh 16220 16220 0 00 20498 20062 436 21
उततिजखड Uttarakhand 2002 2002 0 00 2216 2216 0 00
उततरी कषतर Northern Region 47925 47356 569 12 63166 61726 1440 23
छततीसगढ़ Chhattisgarh 4444 4128 316 71 4444 4270 174 39
गरिजत Gujarat 16263 16263 0 00 17053 16963 90 05
मधय परिश Madhya Pradesh 12328 12323 5 00 13815 13815 0 00
महजिजषटर Maharashtra 22361 22291 70 03 23864 23254 610 26
िमन औि दिउ Daman amp Diu 336 336 0 01 357 356 1 02
िजिि व नगि हवली Dadra amp Nagar Haveli 800 799 1 01 816 815 1 01
गोवज Goa 538 538 0 00 596 596 0 00
पशचिमी कषतर Western Region 53132 52965 167 03 56675 55821 853 15
आनधर परिश Andhra Pradesh 8977 8977 0 00 9459 9453 6 01
तलगजनज Telangana 10471 10471 0 00 10815 10815 0 00
कनजाटक Karnataka 12841 12841 0 00 12841 12841 0 00
किल Kerala 4264 4228 36 09 4264 4228 36 09
तममल नजड Tamil Nadu 15712 15712 0 00 15712 15712 0 00
पडचिी Puducherry 427 412 15 34 427 412 15 34
लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0
दकषकषणी कषतर Southern Region 49464 49464 0 00 49464 49464 0 00
बबहजि Bihar 4633 4633 0 00 5115 5084 31 06
िजमोिि घजटी ननगम DVC 3035 3035 0 00 3035 3035 0 00
झजिखणड Jharkhand 1210 1210 0 00 1339 1291 48 36
ओडडशज Odisha 4827 4827 0 00 5357 5357 0 00
पशशचम बगजल West Bengal 8287 8287 0 00 9130 9123 7 01
मसशककम Sikkim 100 100 0 00 106 106 0 00
अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7
परवी कषतर Eastern Region 21658 21658 0 00 23141 22733 408 18
अरणजचल परिश Arunachal Pradesh 133 131 2 15 138 138 0 01
असम Assam 1539 1508 31 20 1865 1809 56 30
मणणपि Manipur 204 199 5 25 219 216 3 12
मघजलय Meghalaya 357 357 0 00 374 372 1 04
ममज़ोिम Mizoram 108 105 3 28 121 119 2 17
नजगजलड Nagaland 127 125 2 16 156 138 18 116
बिपिज Tripura 249 249 0 00 298 293 5 17
उततर-परवी कषतर North-Eastern Region 2540 2535 5 02 2967 2850 117 39
समपणण भारत All India 169464 168745 719 04 177022 175528 1494 08
Note The revised data for March 2019 is not avaliable 26
अधिकतम वरवदयत आपरत ण शथिरत ररपोरण (परवाणरवलोकन) Peak Power Supply Position Report (Provisional)
आकड़ मगज वजट नट Figures in MW net
राजयStateमािण2019 March2019 अपरल2018 -मािण2019 April2018 to March2019
मजग की पनत ा म कमी मजग की पनत ा म कमी Demand not MetDemand not Met
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
Excludes the supply to Bangladesh
अपरल 2019 April2019 अपरल2018 -मािण2019 April2019 to April2019
उततरी कषतर Northern Region
चडीगढ़ Chandigarh(Data Not Received)दिलली Delhi
हरियजणज Haryana
दहमजचल परिश Himachal Pradeshरमम कशमीि Jammu amp Kashmir(Data
Not Received)परजब Punjab
िजरसथजन Rajasthanउतति परिश Uttar Pradesh
उततिजखड Uttarakhand
पशचिमी कषतर Western Region
छततीसगढ़ Chhattisgarh
Apr-Nov 2018- No cuts
Maximum Demand cut-58MW
Energy cut- 00020-00032 MUsday
गरिजत Gujarat
मधय परिश Madhya Pradesh
महजिजषटर Maharashtra
गोवज Goa
दकषकषणी कषतर Southern Region
आनधर परिश Andhra Pradesh
तलगजनज Telangana
कनजाटक Karnataka
किल Kerala
तममल नजड Tamil Nadu
पडचिी Puducherryपरवी कषतर Eastern Region
बबहजि Bihar
झजिखणड Jharkhand
ओडडशज Odisha
पशशचम बगजल West Bengal
No N
otifie
d Cu
ts
27
मािण 2019 म इडथरीर पर वरवदयत करौती का वरवरवरण Notified Power CutsRestrictions on Industries during April2019
राजय कषतर State Regionऊराणमाग करौती EnergyDemand Cut
No N
otifie
d Cu
tsNo
Notifie
d Cu
ts
अपरल2019 April 2019 अपरल2019 -अपरल2019 April2019 to April2019
उततरी कषतर Northern Region
चडीगढ़ Chandigarh Data not received Data not received
दिलली Delhi Data not received Data not received
हरियजणज Haryana 0811 hrsday 0811 hrsday
दहमजचल परिश Himachal Pradesh HPSEBL has only 2 agriculture consumers and uninterrupted
power is being supplied to agriculture sector
HPSEBL has only 2 agriculture consumers and uninterrupted
power is being supplied to agriculture sector
रमम कशमीि Jammu amp Kashmir Data not received Data not received
परजब Punjab 379 hrsday 379 hrsday
िजरसथजन Rajasthan 0630 hrsday 0630 hrsday
उतति परिश Uttar Pradesh 2157 hrsday 2157 hrsday
उततिजखड Uttarakhand 2359 hrsday 2359 hrsday
पशचिमी कषतर Western Region
छततीसगढ़ Chhattisgarh 18 hrsday 18 hrsday
गरिजत Gujarat 8 hrsday 8 hrsday
मधय परिश Madhya Pradesh Three-Phase Supply(Irrigation)- 0953 hrs day Three-Phase
(Mixed) Supply - 2334 hrs day
Three-Phase Supply(Irrigation)- 0953 hrs day Three-Phase
(Mixed) Supply - 2334 hrs day
महजिजषटर Maharashtra Three-Phase Supply(Irrigation)- 9 hrs day Three-Phase Supply(Irrigation)- 9 hrs day
गोवज Goa No restriction No restriction
दकषकषणी कषतर Southern Region
आनधर परिश Andhra Pradesh 07 hrsday 07 hrsday
तलगजनज Telangana 24 hrsday 24 hrsday
कनजाटक Karnataka 6 hrsday 6 hrsday
किल Kerala No Restrictions No Restrictions
तममल नजड Tamil Nadu 9 hrsday (6 hrs during day time and 3 hrs during night time) 9 hrsday (6 hrs during day time and 3 hrs during night time)
पडचिी Puducherry No Restrictions No Restrictions
परवी कषतर Eastern Region
बबहजि Bihar 18 hrsday 18 hrsday
झजिखणड Jharkhand 20 hrsday 20 hrsday
ओडडशज Odisha 24 hrsday 24 hrsday
पशशचम बगजल West Bengal 23 hrsday 23 hrsday
28
मारच 2019 कषि कषतर को षिदयत आपरतच का षििरण Power Supply to Agricultural Sector during March2019
राजय कषतर State Regionऔसत वरवदयत आपरत ण घनरो म Average Hours of Supply
On segregated feeders
SNo Contents Page
1 Growth of Installed Capacity since 6th Plan 29
2 Progress of Transmission Sector since 6th Plan 30
3 All India Yearly Coal consumption for Power Generation (Utilities)
4 All India Annual Per Capita Consumption of Electricity since -2006
5 Average cost of power supply amp Average realisation (Paisakwh)
6 Growth of Rural Electrification amp Pump Sets Energisation
7 Status of Hydro Schemes Cleared by the CEA in Apr-2019
Section G - Growth of Power Sector
31
32
(In MW)
Coal Gas Diesel Total
End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472
End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634
End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537
End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596
End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921
End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703
End of 12th Plan 19216288 2532938 83763 21832988 6780 4447842 50018 31960630
Up to Apr-2019 20070450 2493722 63763 22627934 678000 4539922 7764163 35610019
Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-17) = 51529 MW
Electricity Generation (MU) Targets and Achievements for 2016-17
Coal Gas Diesel Nuclear Hydro Res Total
2007045 2493722 637629 678000 453992 77641625 22925174
29
1 Growth of Installed Capacity Since 6th Plan
Plan YearThermal
Nuclear Hydro RES (MNRE) Total
2007045
2493722637629
678000
4539922
77641625
Total Installed Capacity 35610019 MW
Coal Gas Diesel Nuclear Hydro Res
Progress of Transmission Sector in the Country up to April 2019
1 TRANSMISSION LINES (All fig in CKM)
At the end of
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
6th plan 0 0 0 0 0 0 0 0 0 0 0 0 1831 4198 0 6029 1641 44364 0 46005 3472 48562 0 52034
7th plan 0 0 0 0 0 0 0 0 0 0 0 0 13068 6756 0 19824 4560 55071 0 59631 17628 61827 0 79455
8th plan 0 0 0 0 1634 0 0 1634 0 0 0 0 23001 13141 0 36142 6564 73036 0 79600 31199 86177 0 117376
9th plan 0 0 0 0 3234 1504 0 4738 751 409 0 1160 29345 20033 0 49378 8687 88306 0 96993 42017 110252 0 152269
10th plan 0 0 0 0 4368 1504 0 5872 1775 409 0 2184 48708 24730 0 73438 9444 105185 0 114629 64295 131828 0 196123
11th Plan 0 0 0 0 5948 1504 1980 9432 4839 411 0 5250 71023 30191 5605 106819 10140 125010 830 135980 91950 157116 8415 257481
12th Plan 6124 0 0 6124 5948 1504 1980 9432 25465 1177 4598 31240 92482 48240 17065 157787 11014 151276 978 163268 141033 202197 24621 367851
13th Plan (Up
to Mar2019)6124 0 0 6124 5948 1504 1980 9432 33692 1512 6605 41809 101335 58238 21173 180746 11734 162552 1010 175296 158833 223806 30768 413407
13th Plan (Up
to Apr-19)6124 0 0 6124 5948 1504 1980 9432 33745 1512 6605 41862 101335 58258 21173 180766 11734 162953 1010 175697 158886 224227 30768 413881
27150 600 MW of 132 kV Inter-Regional power transmission capacity links which are operated radially from time to time is not added in the total
75050
47900
24000
99050
30
Grand Total
Note - The figure upto the end of 10th plan in for stringing progress including the lines not commissioned Now only commissioned lines are reckoned Accordingly the figure for 10th plan (end) may read
as 187555 after adjusting with (-) 10852 Ckm
Inter-regional Power Transfer Capacity (MW)
plusmn 800 kV HVDC plusmn 500 kV HVDC 765 kV 400 kV 220 kV
IR addition in 12th
Plan (up to March
2017)
Inter-regional
Transmission
Capacity at the end
of Plan Period 2017-
22 (as on April19)
IR at the end of 11th
PlanIR at the end of 12th
Plan
IR Capacity Addition
at the end of Plan
Period 2017-22 (Till
April 19)
2004-05 27800
2005-06 28100
2006-07 30200
2007-08 33000
2008-09 35500
2009-10 36700
2010-11 38700
2011-12 41756
2012-13 45460
2013-14 48940
2014-15 53040
2015-16 54590
2016-17 57430
2017-18 60800
2018-19 62890
Year
2005-06
2006-07
2007-08
2008-09
2009-10
2010-11
2011-12
2012-13
2013-14
2014-15
2015-16
2016-17
2017-18
2018-19
2004-05 254 209 7568
2005-06 260 221 7636
2006-07 276 227 7423
2007-08 293 239 7727
2008-09 340 263 8713
2009-10 355 268 8870
2010-11 398 303 11975
2011-12 455 330 13514
2012-13 501 376 14867
2013-14 518 175
2014-15 520
Source- PFC Reports on the performance of State Power Utilities 31
1181
7335
7786
91441
8188
88363
957
1010
1075
1122
1149
(GrossGen+ Net Import) Mid-year population Provisional
5 Average cost of power supply amp average realization ( paiseKWH )
Yearcost of supply
(paiseunit)
Realization(paiseunit)
Including AgricultureOnly
Agriculture
6719
7171
3 All India yearly Coal Consumption for Power Generation (Utilities)
YEARCoal Consumption
Million Tonnes
4 All India Annual per Capita consumption of Electricity Since 2006
Per Capita Consumption ( kWh)
6314
Sl
NoExecuting Agency
Installed
Capacity (MW)Cost (Rs crore)
Date of
Clearance
32
Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as
Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received
from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made
available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified
villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is
independent of the earlier published reports
No Hydro Electric Project has been issued concurrenceAppraisal letter by CEA during April 2019
7 Status of Hydro Schemes Cleared by the CEA in Apr-2019
Name of Scheme
1999-002000-01
297594
010408 to 310309010409 to 310310
10th Plan
2005-062006-07
322968331020
6 Growth Of Rural Electrification amp Pumpsets Energisation
Plan Year
9th Plan2002-03
134092626
4111
Pump Sets Energised Villages Electricfied (Nos)
2001-02
284064367244
1218
27801997-981998-99
3207
482864
12632
1576036
4451722594
15455554
2314176
397343611750
2093311060316074
65109527813884
46708
18423975
499150
2003-042004-05
5743
9769
Cumu upto End of 10th Plan
010407 to 310308
010410 to 310311557976840909
010411 to 310312
412667
86293726
No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification
since 2004-05
65291374575 296361511th Plan
Cumu upto End of 11th Plan
596556 21212860
557439Cummulative up to end of 12th Plan
SN Contents Page
1 Rate of sale of power for the year 2016-17 33-41
RATE OF SALE OF POWER FOR THE YEAR 2016-17
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) NORTHERN REGION
CENTRAL SECTOR
BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 18000 66900 19800
CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 54000 222400 21600
CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 30000 144400 19600
CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 23100 91700 42600
PARBATI - III HPS NHPC LTD HYDRO-HYDRO 52000 68200 54800
DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 28000 95600 30000
CHUTAK NHPC LTD HYDRO-HYDRO 4400 22000 79800
DULHASTI HPS NHPC LTD HYDRO-HYDRO 39000 228000 56400
SALAL HPS NHPC LTD HYDRO-HYDRO 69000 342300 11000
TANAKPUR HPS NHPC LTD HYDRO-HYDRO 9420 43000 29600
URI HPS -I NHPC LTD HYDRO-HYDRO 48000 280300 16000
URI HPS - II NHPC LTD HYDRO-HYDRO 24000 147300 48600
NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 4500 24600 88200
SEWA - II NHPC LTD HYDRO-HYDRO 12000 47100 43400
ANTA CCPP NTPC LTD THERMAL-GASN 41930 67539 32400
AURAIYA CCPP NTPC LTD THERMAL-GASN 66336 53501 39100
BADARPUR TPS NTPC LTD THERMAL-COAL 70500 159153 44800
DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 84000 296170 42300
DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 98000 526686 46300
DADRI CCPP NTPC LTD THERMAL-GASHSD 82978 227469 33000
FARIDABAD CCPP NTPC LTD THERMAL-GASN 43159 115577 30800
RIHAND STPS I NTPC LTD THERMAL-COAL 100000 596766 24500
RIHAND STPS II NTPC LTD THERMAL-COAL 100000 737069 24600
RIHAND STPS III NTPC LTD THERMAL-COAL 100000 706546 30600
SINGRAULI STPS NTPC LTD THERMAL-COAL 200000 1394068 20400
TANDA TPS NTPC LTD THERMAL-COAL 44000 295438 40800
UNCHAHAR TPS I NTPC LTD THERMAL-COAL 42000 256454 39800
UNCHAHAR TPS II NTPC LTD THERMAL-COAL 42000 273577 38900
UNCHAHAR TPS III NTPC LTD THERMAL-COAL 21000 142780 43000
KOLDAM NTPC LTD HYDRO-HYDRO 80000 363260 43600
NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 303575 25841
RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 108000 668677 35374
NJHPS SJVNL HYDRO-HYDRO 150000 699496 23820
RAMPUR HPS SJVNL HYDRO-HYDRO 41202 195982 32260
TEHRI HPP THDC HYDRO-HYDRO 100000 272543 51800
KOTESHWAR HEP THDC HYDRO-HYDRO 40000 106244 53400
IGSTPS JHAJJAR ARAVALI P CPL THERMAL-COAL 150000 510429 49490
NEYVELI BARSINGSAR NEYVELI LIG CORP LTD THERMAL-LIG 25000 127520 38040
STATE SECTOR
PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 21000 14222 48200
PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 21000 19205 48400
PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 25000 102257 42600
PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 25000 62107 41800
DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 60000 312213 41000
RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 120000 35767442200
WYC HYDEL STATION HPGCL HYDRO-HYDRO 6240 20365 24900
GIRI POWER HOUSE HPSEB HYDRO-HYDRO 6000 13958 7600
ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 1695 5467 11900
BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 12000 18528 6700
GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 2250 7462 22500
BASSI POWER HOUSE HPSEB HYDRO-HYDRO 6600 29649 7500
BINWA POWER HOUSE HPSEB HYDRO-HYDRO 600 2749 19300
ANNEXURE-I
RATE OF SALE OF POWER FOR THE YEAR 2016-2017
Page 33
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) GAJ POWER HOUSE HPSEB HYDRO-HYDRO 1050 2914 26700
BANER POWER HOUSE HPSEB HYDRO-HYDRO 1200 2864 16200
HOLI POWER HOUSE HPSEB HYDRO-HYDRO 300 616 22500
THIROT POWER HOUSE HPSEB HYDRO-HYDRO 450 1126 22500
KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 1200 3064 22500
LARJI POWER HOUSE HPSEB HYDRO-HYDRO 12600 53677 23700
NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 250 750 31000
CHABA POWER HOUSE HPSEB HYDRO-HYDRO 175 465 23300
RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 150 101 13400
SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 200 000 22500
KILLAR HPSEB HYDRO-HYDRO 030 050 22500
BHABA AUGUMENP H HPSEB HYDRO-HYDRO 450 1276 22500
BS CHAMBA HPSEB HYDRO-HYDRO 045 099 19500
GUMMA HPSEB HYDRO-HYDRO 300 423 22500
GAS TURBINE POWER STATION IPGCL THERMAL-GAS 27000 67233 39300
PPS-I PPCL THERMAL-GAS 33000 175905 38300
PPS-III PPCL THERMAL-GAS 137120 196879 36100
LOWER JHELUM JampKPDD HYDRO-HYDRO 10500 60214 5100
UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 2260 10514 6300
UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 10500 44202 8500
GANDHARBAL JampKPDD HYDRO-HYDRO 1500 8925 4700
KARNAH MPH JampKPDD HYDRO-HYDRO 200 1122 31000
CHENANI I JampKPDD HYDRO-HYDRO 2330 10892 6600
CHENANI II JampKPDD HYDRO-HYDRO 200 1188 9300
CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 750 3634 14200
IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 375 2108 18500
IGO MERCHELLONG JampKPDD HYDRO-HYDRO 300 1572 29700
PAHALGAM MHP JampKPDD HYDRO-HYDRO 450 1713 32900
MARPACHOO JampKPDD HYDRO-HYDRO 075 375 29800
HAFTAL JampKPDD HYDRO-HYDRO 100 483 28700
SANJAK JampKPDD HYDRO-HYDRO 126 441 36000
SEWA-III JampKPDD HYDRO-HYDRO 900 3273 20200
BHADERWAH JampKPDD HYDRO-HYDRO 150 935 8900
BAZGO JampKPDD HYDRO-HYDRO 030 108 33300
SUMOOR JampKPDD HYDRO-HYDRO 010 045 35400
HUNDER JampKPDD HYDRO-HYDRO 040 176 26200
STAKNA JampKPDD HYDRO-HYDRO 400 1933 4100
KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 124000 662879 31360
SURATGARH TPS RRVUNL THERMAL-COAL 150000 402328 41730
CHHABRA TPS 1amp 2 RRVUNL THERMAL-COAL 50000 305946 36700
CHHABRA TPS 3 RRVUNL THERMAL-COAL 25000 151536 36700
CHHABRA TPS 4 RRVUNL THERMAL-COAL 25000 155896 36700
RAMGARH GT POWER PROJECT RRVUNL THERMAL-COAL 22050 43177 41800
RAMGARH GAS T P PROJECT 3 RRVUNL THERMAL-GAS 5000 93615 41800
DHOLPUR C C POWER PROJECT RRVUNL THERMAL-R-LNG 33000 9486 46110
MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 14000 20855 34192
MINI MICRO HYDEL (MMH) P S RRVUNL HYDRO-HYDRO 2385 851 37800
KALISINDH TPP 1 RRVUNL THERMAL-COAL 60000 341543 45000
KALISINDH TPP 2 RRVUNL THERMAL-COAL 60000 211588 45000
KHARA HEP UPJVNL HYDRO-HYDRO 7200 26654 7200
MATATILLA HEP UPJVNL HYDRO-HYDRO 3060 12219 6500
OBRA HEP UPJVNL HYDRO-HYDRO 9900 21517 6300
RIHAND UPJVNL HYDRO-HYDRO 30000 57369 5500
ANPARA A TPS UPRVUNL THERMAL-COAL 63000 317536 27000
ANPARA B TPS UPRVUNL THERMAL-COAL 100000 705605 22700
ANPARA D UPRVUNL THERMAL-COAL 100000 300158 39800
HARDUAGANJ TPS UPRVUNL THERMAL-COAL 16500 45817 49200
HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 50000 304389 46600
OBRA A TPS UPRVUNL THERMAL-COAL 28800 13158 34000
OBRA B TPS UPRVUNL THERMAL-COAL 100000 328124 21900
Page 34
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) PANKI TPS UPRVUNL THERMAL-COAL 21000 66488 50300
PARICHHA TPS UPRVUNL THERMAL-COAL 22000 38762 49400
PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 42000 231931 45600
PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 50000 276722 50400
CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 24000 70845 8290
CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 14400 75366 8390
DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 3375 9595 12080
DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 5100 18701 10520
KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4140 17359 12330
KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 12000 33001 9420
KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 3000 11953 8320
TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 9000 33983 12460
MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 30400 124510 16110
RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 19800 17897 10550
MPUR UTTARAKHAND JVNL HYDRO-HYDRO 930 5121 19200
PATHRI UTTARAKHAND JVNL HYDRO-HYDRO 2040 11636 14200
GALOGI UTTARAKHAND JVNL HYDRO-HYDRO 300 648 12500
PRIVATE SECTOR
MGTPP CLP INDIA PVT LTD THERMAL-COAL 132000 268902 41940
SHRINAGAR HEP ALAKNANDA HPCL HYDRO-HYDRO 33000 127414 48800
GAMA INFRAPROP CCPP GAMA INFRAPROP PVT THERMAL-GAS 22500 52686 47000
PPGCL (BARA) JP POWER VENTURES LTD THERMAL-COAL 198000 448200 38500
MALANA HEP MALANA PCL HYDRO-HYDRO 8600 26354 29792
MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 10000 30369 32580
ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 19200 56347 36079
KASHANG HEP H P PCL HYDRO-HYDRO 19500 5034 29200
BASPA-II HEP HBPCL HYDRO-HYDRO 30000 132769 13600
KARCHAM WANGTOO HEP HBPCL HYDRO-HYDRO 100000 434386 36600
RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 108000 582600 43700
RITHALA COMBI CY POWER PLANT TATA POWER DDL THERMAL-GAS 9480 000 11900
RAJPURA TPS NABHA POWER LTD THERMAL-GAS 140000 901484 39000
TALWANDI SABO POWER LTD TALWANDI SABO POWER LTD THERMAL-COAL 198000 636040 49548
ROJA THERMAL POWER STATION ROJA POWER SCL THERMAL-COAL 120000 727200 43400
KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 34400 63400
BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 36000 62600
MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 38200 60800
UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 37900 61500
KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 42300 58800
LALITPUR PGCL BAJAJ ENERGY PVT LTD THERMAL-COAL 198000 359400 47300
PRAYAGRAJ PGCL PRAYAGRAJ PGCL THERMAL-COAL 132000 448200 38595
KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 132000 783182 33438
WESTERN REGION
CENTRAL SECTOR
INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 100000 325333 23892
OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 52000 141663 34001
GANDHAR CCPP NTPC LTD THERMAL-GAS 65739 221924 28700
KAWAS CCPP NTPC LTD THERMAL-GASN 65620 167929 27000
KORBA I amp II NTPC LTD THERMAL-COAL 210000 1499171 20500
KORBA III NTPC LTD THERMAL-COAL 50000 358746 26600
SIPAT STPS I NTPC LTD THERMAL-COAL 198000 1479902 26800
SIPAT STPS II NTPC LTD THERMAL-COAL 100000 766549 26500
VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 126000 693142 25800
VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 100000 608781 23800
VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 100000 673475 27600
VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 100000 655924 32900
VINDHYACHAL STPS V NTPC LTD THERMAL-COAL 50000 328265 31700
MOUDA I NTPC LTD THERMAL-COAL 100000 343130 44500
MOUDA Ii NTPC LTD THERMAL-COAL 66000 40637 39900
RATNAGIRI GAS amp POWER PVT LTD RGPPL THERMAL-GAS 196708 442485 47000
KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 000 24729
TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 32000 201227 10740
Page 35
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 365122 19069
TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 787444 29324
STATE SECTOR
GSEG-HAZIRA15610 MW GUJARAT S ENEGEN LTD THERMAL-GAS 15610 1805 28200
GSEG-HAZIRA35143 MW GUJARAT S ENEGEN LTD THERMAL-GAS 35130 22276 51300
GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 21978 51800
AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 13929 26100
KORBA TPS EAST CSPGCL THERMAL-COAL 44000 198673 33880
DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 365808 27570
KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 316500 30420
HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 532878 19410
CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 515 58300
MTTPS CHAMPA U-I CSPGCL THERMAL-COAL 50000 220376 39000
MTTPS CHAMPA U-II CSPGCL THERMAL-COAL 50000 23709 10000
SHP GANGREL CSPGCL HYDRO-HYDRO 1000 2350 36790
BANGO HEP CSPGCL HYDRO-HYDRO 12000 14662 8900
MHP KORBA WEST CSPGCL HYDRO-HYDRO 170 859 38190
SIKASAR HEP CSPGCL HYDRO-HYDRO 700 418 26870
DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8843 74500
DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 19446 51500
GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 66388 71600
GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127488 41300
KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 96072 43900
KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 29841 56400
SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 184966 58800
UKAI 1-5 GSECL THERMAL-COAL 85000 204891 46900
UKAI TPS 6 GSECL THERMAL-COAL 50000 284448 48200
WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 271999 58300
WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 82808 44100
KADANA HPS GSECL HYDRO-HYDRO 24200 34433 16800
UKAI HPS GSECL HYDRO-HYDRO 30500 40585 6100
TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 123000 11500
BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 8900 10900
BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 7200 27500
JHINNA HPS MPPGCL HYDRO-HYDRO 2000 9700 18500
RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 44300 3400
GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 17300 4600
SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 4100 16900
MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 14600 27000
PENCH HPS MPPGCL HYDRO-HYDRO 16000 23700 8100
RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 3000 16900
AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 134400 35100
SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 283800 38700
SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 344600 34300
SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 111600 61600
SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 211800 58000
SSTPS PH-I MPPGCL THERMAL-COAL 120000 233100 84300
BHUSAWAL TPS MSPGCL THERMAL-COAL 142000 566258 51100
CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1365682 33700
KHAPERKHEDA MSPGCL THERMAL-COAL 134000 706207 39100
KORADI TPS MSPGCL THERMAL-COAL 62000 443206 42000
NASIK TPS MSPGCL THERMAL-COAL 63000 297275 47000
PARLI TPS MSPGCL THERMAL-COAL 113000 175934 71600
PARAS MSPGCL THERMAL-COAL 50000 267931 38700
URAN CCPP MSPGCL THERMAL-GAS 67200 320330 30600
KOYANA MSPGCL HYDRO-HYDRO 195600 328155 13100
SMALL HYDRO POWER PLANTS MSPGCL HYDRO-HYDRO 45400 93062 30500
BHIRA MSPGCL HYDRO-HYDRO 8000 10046 8400
TILLARI MSPGCL HYDRO-HYDRO 8900 10584 3100
SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 233298 20500
SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 87633 20500
PRIVATE SECTOR
Page 36
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 81282 46750
JNSTPP(JAYPEE NIGRIE) JP POWER VENTURES LTD THERMAL-COAL 132000 726695 29310
MB POWER MB POWER THERMAL-COAL 120000 345632 38310
ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 754922 28671
ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 780761 23495
ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 198000 1263784 32090
ADANI POWER MAHARA ADANI POWER LTD THERMAL-COAL 330000 1666191 34124
AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 170065 36827
SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 252035 45129
ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 458551 36000
ESSAR POWER MP LTD ESSAR POWER MP LTD THERMAL-COAL 60000 243040 28600
VEDANTA LTD (P P -I) VEDANTA LTD THERMAL-GAS 3000 15044 24000
VEDANTA LTD (P P -II) VEDANTA LTD THERMAL-GAS 3000 21293 24000
PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 8234600 24000
165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 5850 64390
145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 68717 40349
SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 132655 28776
SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 144686 38567
MUNDRA UMPPCOASTAL GUJARAT POWER
LTD THERMAL-IMP COAL 400000 2530300
23900
LANCO AMARKANTAK TPP PATHADIH
U-ILANCO AMARKAN POWER LTD THERMAL-COAL 30000 195500
29200
LANCO AMARKANTAK TPP PATHADIH
U-IILANCO AMARKAN POWER LTD THERMAL-COAL 30000 206900
27600
BARADARHA TPS D B POWER LTD THERMAL-COAL 120000 677373 29200
JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 405000 28900
JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 453000 40500
DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 339437 40700
TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 293400 44000
TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 137200 37000
TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 174900 44000
BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 92900 14100
BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23700 34300
KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 27600 48300
CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2530300 23900
BHANDARDRA HEP -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 2475 54900
SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 161400 26500
SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 445000 39000
SOTHERN REGION
CENTRAL SECTOR
NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 325699 54820
NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 305532 39880
NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 998805 38510
NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 113016 54070
NEYVELI TAMILNADU POWER LTD JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 625274 42200
VALLUR TPS NTPC TECL THERMAL-COAL 150000 856438 42350
R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 1493 84300
RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1502919 29400
RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 341291 31800
SIMHADRI I NTPC LTD THERMAL-COAL 100000 688382 36800
SIMHADRI II NTPC LTD THERMAL-COAL 100000 663657 43400
KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 593110 31324
MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 291625 21764
KKNPP-1 amp 2 NPCIL NUCLEAR-NUCLEAR 200000 572609 40948
MINICOY LAKSHADEEP THERMAL-DIESEL 340 770 29600
KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1097 29600
AMINI LAKSHADEEP THERMAL-DIESEL 265 509 29600
ANDROTT LAKSHADEEP THERMAL-DIESEL 219 524 29600
KALPENI LAKSHADEEP THERMAL-DIESEL 175 356 29600
AGATTI LAKSHADEEP THERMAL-DIESEL 195 658 29600
KADMAT LAKSHADEEP THERMAL-DIESEL 190 414 29600
KILTAN LAKSHADEEP THERMAL-DIESEL 150 269 29600
CHETLET LAKSHADEEP THERMAL-DIESEL 100 139 29600
BITRA LAKSHADEEP THERMAL-DIESEL 043 024 29600
BANGARAM LAKSHADEEP THERMAL-DIESEL 018 009 29600
Page 37
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) STATE SECTOR
Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 721811 46500
Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 50000 336142 46500
RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 237358 46500
RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 239926 46500
RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 124500 46500
SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 62109 46500
UPPER SILERU APGENCO HYDRO-HYDRO 24000 33000 46500
LOWER SILERU APGENCO HYDRO-HYDRO 46000 81066 46500
DONKARAI APGENCO HYDRO-HYDRO 2500 6007 46500
PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 1262 46500
CHETTIPETA APGENCO HYDRO-HYDRO 100 214 46500
MUCHKUND APGENCO HYDRO-HYDRO 12000 37571 46500
NAGARJUNASAGAR RCPH APGENCO HYDRO-HYDRO 9000 606 46500
TUNGABHADRA HES amp HAMPI(AP
Share)
APGENCO HYDRO-HYDRO 7200 6100 46500
KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 352232 42600
KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 288131 32500
KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 319272 46500
RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 40073 44300
KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 308317 46000
KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 308963 51300
SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 61004 76600
NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 17960 75300
PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 20873 58300
POCHAMPAD-I TSPGENCO HYDRO-HYDRO 2700 5455 29800
POCHAMPAD-II TSPGENCO HYDRO-HYDRO 900 1932 40700
NIZAMSAGAR TSPGENCO HYDRO-HYDRO 1000 1126 53400
RAICHUR TPS 1 to 7 KPCL THERMAL-COAL 147000 890866 43800
RAICHUR TPS 8 KPCL THERMAL-COAL 25000 159523 48200
BELLARI TPS 1 KPCL THERMAL-COAL 50000 318679 51100
BELLARI TPS 2 KPCL THERMAL-COAL 50000 232347 55600
BELLARI TPS 3 KPCL THERMAL-COAL 70000 47565 34400
BHADRA PH KPCL HYDRO-HYDRO 3920 2369 45900
GERUSUPPA PH KPCL HYDRO-HYDRO 24000 26990 22000
GHAT PRABHA HEP KPCL HYDRO-HYDRO 3200 4777 25300
KADRA HPS KPCL HYDRO-HYDRO 15000 16889 26800
NAGJHARI KPCL HYDRO-HYDRO 90000 155159 9800
KODASALLI DPH KPCL HYDRO-HYDRO 12000 14854 19200
MUNIRA+MGH+SPH+SPH KPCL HYDRO-HYDRO 22640 48211 7900
SHARAVATHY HPS KPCL HYDRO-HYDRO 108550 276215 5400
ALMATTI DPH KPCL HYDRO-HYDRO 29000 39611 24600
VARAHI UGPH KPCL HYDRO-HYDRO 46000 71368 15600
IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 17196 15300
IDUKKI HPS KSEB HYDRO-HYDRO 78000 137905 15300
KAKKAD HPS KSEB HYDRO-HYDRO 5000 13063 15300
KALLADA HPS KSEB HYDRO-HYDRO 1500 4436 15300
KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 46544 15300
KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 635 15300
LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 30822 15300
MALANKARA HPS KSEB HYDRO-HYDRO 1050 2474 15300
MATTUPETTY KSEB HYDRO-HYDRO 200 230 15300
MALAMPUZHA KSEB HYDRO-HYDRO 250 063 15300
CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 864 15300
URUMI ST I amp II KSEB HYDRO-HYDRO 615 903 15300
LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 248 15300
NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7765 19625 15300
PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 16601 15300
PANNIAR HPS KSEB HYDRO-HYDRO 3240 6217 15300
PORINGALKUTHU KSEB HYDRO-HYDRO 3600 10052 15300
PORINGALKUTHU LBE KSEB HYDRO-HYDRO 1600 9438 15300
PEPPARA KSEB HYDRO-HYDRO 300 395 15300
POOZHITHODE KSEB HYDRO-HYDRO 480 1045 15300
Page 38
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) PEECHI KSEB HYDRO-HYDRO 125 040 15300
RANI-PERUNADU KSEB HYDRO-HYDRO 400 585 15300
SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 79783 15300
SENGULAM HPS KSEB HYDRO-HYDRO 5120 11558 15300
SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 16711 15300
VILANGAD KSEB HYDRO-HYDRO 750 1578 15300
BARAPOLE KSEB HYDRO-HYDRO 1500 1932 15300
VELLATHOOVAL KSEB HYDRO-HYDRO 360 305 15300
CHIM0NY KSEB HYDRO-HYDRO 250 156 15300
ADYANPARA KSEB HYDRO-HYDRO 350 501 15300
BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 554 15300
KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 3801 15300
KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 23132 32800
ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 14416 62280
METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 523970 62280
METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 321270 62280
NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 336575 62280
NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 591240 62280
TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 508966 62280
KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 30897 62280
VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 18720 90699 62280
KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 33593 62280
BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 1047 62280
PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 1250 62280
PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 330 62280
MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 4897 62280
MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 032 62280
KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15681 62280
KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 40608 62280
KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 21342 62280
KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 4717 62280
KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4322 62280
KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2399 62280
METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 4416 62280
METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 8035 62280
BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2187 62280
BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2359 62280
BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2511 62280
BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 1949 62280
BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 1819 62280
POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 172 62280
SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 241 62280
MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 026 62280
THIRUMOORTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 136 62280
PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 9309 62280
VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 353 62280
SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 4192 62280
PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 6571 62280
SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 1186 62280
SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6319 62280
ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 6122 62280
KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 28674 62280
SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 18381 62280
SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 4258 62280
KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 12680 62280
KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4201 62280
ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 000 62280
PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 19175 62280
AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 078 62280
BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 504 62280
BHAVANI KATTALAI (BKB)(IIIampIII BB I amp II)TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 5847 62280
PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 000 62280
Page 39
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) SRI DAMODARAM STPS APPDCL THERMAL-COAL 160000 808108 36300
PRIVATE SECTOR
KARUPPUR TANJORE LANCO TANJORE PCL THERMAL-GAS 12000 48096 28770
SIMHAPURI ENERGY LTD SIMHAPURI ENERGY LTD THERMAL-COAL 60000 143900 39100
JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 7111 45500
SBU 1 JSW ENERGY LTD
VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 26000 159100
43300
SBU 2 JSW ENERGY LTD
VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 60000 247900
42800
LANCO KPLLANCO KONDAPALLI POWER
LTDTHERMAL-GAS 36814 85060
25776
LANCO KPL STG -IILANCO KONDAPALLI POWER
LTDTHERMAL-GAS 36600 12979
46330
LANCO KPL STG -IIIALANCO KONDAPALLI POWER
LTDTHERMAL-GAS 37100 85710
46330
LANCO KPL STG -III BLANCO KONDAPALLI POWER
LTDTHERMAL-GAS 37100 43639
46330
HINDUJA NATIONAL PCL HINDUJA NATIONAL PCL THERMAL-COAL 104000 303000 38200
MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 121164 49940
UDUPI POWER COR LTD ADANI POWER LTD THERMAL-COAL 120000 754613 42500
SPECTRUM POWER GENERATION
LTD SPECTRUM PG LTD THERMAL-GASN 20525 9256812
34952
TAQA NEYVELI POWER COM PVT
LTD TAQA NEYVELI THERMAL-LIG 25000 5840
34500
ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 251000 51000
ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 207860 36800
GMR VEMAGIRI POWER GENERATION
LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 30117
46450
EASTERN REGION
CENTRAL SECTOR
MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 64675 53113
MTPS STAGE - II KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 39000 1432 69138
BOKARO `B` TPS DVC THERMAL-COAL 63000 145670 31539
MEJIA TPS U 1-3 DVC THERMAL-COAL 63000 348298 31552
MEJIA TPS U 4 DVC THERMAL-COAL 21000 116099 34997
MEJIA TPS U 5-6 DVC THERMAL-COAL 50000 276427 35976
MEJIA TPS U 7-8 DVC THERMAL-COAL 100000 552854 36991
DURGAPUR STEEL TPS DVC THERMAL-COAL 100000 665550 39323
DURGAPUR TPS DVC THERMAL-COAL 21000 59270 35416
RAGHUNATHPUR TPS DVC THERMAL-COAL 120000 201650 35326
MAITHON HYDEL STA DVC HYDRO-HYDRO 6320 12200 17984
CHANDRAPURA TPSU1-3 DVC THERMAL-COAL 42000 257610 35095
CHANDRAPURA TPSU7-8 DVC THERMAL-COAL 50000 306673 34987
KODERMA TPS DVC THERMAL-COAL 100000 380180 38131
PANCHET HPS DVC HYDRO-HYDRO 8000 13360 17984
TILLAYA HPS DVC HYDRO-HYDRO 400 1410 17984
RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34700 35400
TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 277300 23200
TLDP -III NHPC LTD HYDRO-HYDRO 13200 55400 62000
TLDP -IV NHPC LTD HYDRO-HYDRO 16000 60300 25600
FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 957219 33700
FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 308943 41000
BONGAINGAON TPS NTPC LTD THERMAL-COAL 25000 153663 58600
KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 542277 34200
KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 942591 34200
BARH-II NTPC LTD THERMAL-COAL 132000 728021 44500
TALCHER TPS NTPC LTD THERMAL-COAL 46000 335521 30100
TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 702319 25600
TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1436521 24700
STATE SECTOR
BTPS(RampM) BIHAR STATE PGCL THERMAL-COAL 22000 12142 39700
BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 98331 10602
HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 50593 9482
CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 19689 2605
RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 53192 6033
UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 147208 14637
Page 40
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 60353 4519
IB TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 288567 25000
J P H GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 210 038 61100
MEYONG CHU GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 400 1086 61100
TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 122667 38200
DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 214339 43321
KOLAGHAT THERMAL POWER
STATION
WEST BENGAL PDCL THERMAL-COAL 126000 538269 31603
BAKRESHWAR THERMAL POWER
PLANT
WEST BENGAL PDCL THERMAL-COAL 105000 634876 32154
BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 45000 166855 33299
SANTHALDIH THERMAL POWER
STATION
WEST BENGAL PDCL THERMAL-COAL 50000 336442 34932
SAGARDIGHI THERMAL POWER
PROJECT
WEST BENGAL PDCL THERMAL-COAL 160000 423121 34705
JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 20344 68900
RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 24559 68900
TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 4623 68900
PURULIA PUMPED STORAGE
PROJECT
WEST BENGAL SEDCL HYDRO-HYDRO 90000 108816 68900
MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2768 68900
PRIVATE SECTOR
CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 49474 20230
CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 555500 70200
HALDIA ENERGY HALDIA ENERGY LTD THERMAL-COAL 60000 371000 50400
DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3688 63400
KAMALANGA TPS GMR KAMALANGA ENERGY LTD THERMAL-COAL 105000547670
33300
ADHUNIK POWER U-1 ADHUNIK POWER THERMAL-COAL 27000 158 44060
ADHUNIK POWER U-2 ADHUNIK POWER THERMAL-COAL 27000 168 44250
VL-JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 332800 23622
JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 43000 45250
JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 71700 37030
JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 70700 35920
JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 71100 38870
JOJOBERA UNIT 5 TATA POWER COM LTD THERMAL-COAL 12000 79300 44560
JOJOBERA UNIT 6 TATA POWER COM LTD THERMAL-WHR 12000 83700 12840
IEL KALINGANAGAR U-I TATA POWER COM LTD THERMAL-WG 6750 33400 22500
IEL KALINGANAGAR U-II TATA POWER COM LTD THERMAL-WG 6750 34800 22500
MAITHON UNIT 1 amp 2 TATA POWER COM LTD THERMAL-COAL 105000 678000 36100
HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 27500 24340
HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 28400 24340
HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 15800 24310
NORTH EASTERN REGION
CENTRAL SECTOR
LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 74100 36600
AGARTALA GT NEEPCO THERMAL-GAS 13500 88611 27210
ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 153111 32310
DOYANG HEP NEEPCO HYDRO-HYDRO 7500 25598 49801
KOPILI HEP NEEPCO HYDRO-HYDRO 20000 98186 11491
KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 19582 20237
KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 10310 17968
RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 124093 22945
TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 10100 17344 39000
STATE SECTOR
HYDRO POWER (122 Stns) ITANAGAR GOVT OF ARUNACHAL
PRADESHHYDRO-HYDRO 6971 6217270
24600
KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39514 17337
LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 82327 36810
NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 33318 48290
MYNTRIANG SHEP ST II ASSAM POWER GENCO HYDRO-HYDRO 300 567 35776
LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 9130 49200
LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 012 49200
DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 022 49200
TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 000 49200
UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 4990 16000
UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 6476 37000
UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 16494 14600
UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 3600 9556 15000
SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 758 8000
MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44070 44800
KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 154 41400
TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 091 41400
MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 411 41400
MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 394 41400
KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 760 41400
SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 3264 41400
LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 044 41400
BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 18953 28000
ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 43585 28200
GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 4080 11100
Note
LIG Lignite N Naptha WHR Waste Heat Recovery
Page 41
अधधकतम मजग अधधकतम उपलशबध अधधकतम मजग अधधकतम उपलशबधपरणाली System Peak Demand Peak Met Peak Demand Peak Met
कषतर Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )
चडीगढ़ Chandigarh 223 223 0 00 369 369 0 00
दिलली Delhi 4016 4016 0 00 7016 7016 0 00
हरियजणज Haryana 6544 6544 0 00 10270 10270 0 00
दहमजचल परिश Himachal Pradesh 1683 1683 0 00 1700 1700 0 00
रमम कशमीि Jammu amp Kashmir 3277 2622 655 200 3277 2622 655 200
परजब Punjab 6564 6564 0 00 12638 12638 0 00
िजरसथजन Rajasthan 11885 11885 0 00 13276 13276 0 00
उतति परिश Uttar Pradesh 16220 16220 0 00 20498 20062 436 21
उततिजखड Uttarakhand 2002 2002 0 00 2216 2216 0 00
उततरी कषतर Northern Region 47925 47356 569 12 63166 61726 1440 23
छततीसगढ़ Chhattisgarh 4444 4128 316 71 4444 4270 174 39
गरिजत Gujarat 16263 16263 0 00 17053 16963 90 05
मधय परिश Madhya Pradesh 12328 12323 5 00 13815 13815 0 00
महजिजषटर Maharashtra 22361 22291 70 03 23864 23254 610 26
िमन औि दिउ Daman amp Diu 336 336 0 01 357 356 1 02
िजिि व नगि हवली Dadra amp Nagar Haveli 800 799 1 01 816 815 1 01
गोवज Goa 538 538 0 00 596 596 0 00
पशचिमी कषतर Western Region 53132 52965 167 03 56675 55821 853 15
आनधर परिश Andhra Pradesh 8977 8977 0 00 9459 9453 6 01
तलगजनज Telangana 10471 10471 0 00 10815 10815 0 00
कनजाटक Karnataka 12841 12841 0 00 12841 12841 0 00
किल Kerala 4264 4228 36 09 4264 4228 36 09
तममल नजड Tamil Nadu 15712 15712 0 00 15712 15712 0 00
पडचिी Puducherry 427 412 15 34 427 412 15 34
लकष-दवीप Lakshadweep 8 8 0 0 8 8 0 0
दकषकषणी कषतर Southern Region 49464 49464 0 00 49464 49464 0 00
बबहजि Bihar 4633 4633 0 00 5115 5084 31 06
िजमोिि घजटी ननगम DVC 3035 3035 0 00 3035 3035 0 00
झजिखणड Jharkhand 1210 1210 0 00 1339 1291 48 36
ओडडशज Odisha 4827 4827 0 00 5357 5357 0 00
पशशचम बगजल West Bengal 8287 8287 0 00 9130 9123 7 01
मसशककम Sikkim 100 100 0 00 106 106 0 00
अडमजन-ननकोबजि Andaman- Nicobar 58 54 4 7 58 54 4 7
परवी कषतर Eastern Region 21658 21658 0 00 23141 22733 408 18
अरणजचल परिश Arunachal Pradesh 133 131 2 15 138 138 0 01
असम Assam 1539 1508 31 20 1865 1809 56 30
मणणपि Manipur 204 199 5 25 219 216 3 12
मघजलय Meghalaya 357 357 0 00 374 372 1 04
ममज़ोिम Mizoram 108 105 3 28 121 119 2 17
नजगजलड Nagaland 127 125 2 16 156 138 18 116
बिपिज Tripura 249 249 0 00 298 293 5 17
उततर-परवी कषतर North-Eastern Region 2540 2535 5 02 2967 2850 117 39
समपणण भारत All India 169464 168745 719 04 177022 175528 1494 08
Note The revised data for March 2019 is not avaliable 26
अधिकतम वरवदयत आपरत ण शथिरत ररपोरण (परवाणरवलोकन) Peak Power Supply Position Report (Provisional)
आकड़ मगज वजट नट Figures in MW net
राजयStateमािण2019 March2019 अपरल2018 -मािण2019 April2018 to March2019
मजग की पनत ा म कमी मजग की पनत ा म कमी Demand not MetDemand not Met
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
Excludes the supply to Bangladesh
अपरल 2019 April2019 अपरल2018 -मािण2019 April2019 to April2019
उततरी कषतर Northern Region
चडीगढ़ Chandigarh(Data Not Received)दिलली Delhi
हरियजणज Haryana
दहमजचल परिश Himachal Pradeshरमम कशमीि Jammu amp Kashmir(Data
Not Received)परजब Punjab
िजरसथजन Rajasthanउतति परिश Uttar Pradesh
उततिजखड Uttarakhand
पशचिमी कषतर Western Region
छततीसगढ़ Chhattisgarh
Apr-Nov 2018- No cuts
Maximum Demand cut-58MW
Energy cut- 00020-00032 MUsday
गरिजत Gujarat
मधय परिश Madhya Pradesh
महजिजषटर Maharashtra
गोवज Goa
दकषकषणी कषतर Southern Region
आनधर परिश Andhra Pradesh
तलगजनज Telangana
कनजाटक Karnataka
किल Kerala
तममल नजड Tamil Nadu
पडचिी Puducherryपरवी कषतर Eastern Region
बबहजि Bihar
झजिखणड Jharkhand
ओडडशज Odisha
पशशचम बगजल West Bengal
No N
otifie
d Cu
ts
27
मािण 2019 म इडथरीर पर वरवदयत करौती का वरवरवरण Notified Power CutsRestrictions on Industries during April2019
राजय कषतर State Regionऊराणमाग करौती EnergyDemand Cut
No N
otifie
d Cu
tsNo
Notifie
d Cu
ts
अपरल2019 April 2019 अपरल2019 -अपरल2019 April2019 to April2019
उततरी कषतर Northern Region
चडीगढ़ Chandigarh Data not received Data not received
दिलली Delhi Data not received Data not received
हरियजणज Haryana 0811 hrsday 0811 hrsday
दहमजचल परिश Himachal Pradesh HPSEBL has only 2 agriculture consumers and uninterrupted
power is being supplied to agriculture sector
HPSEBL has only 2 agriculture consumers and uninterrupted
power is being supplied to agriculture sector
रमम कशमीि Jammu amp Kashmir Data not received Data not received
परजब Punjab 379 hrsday 379 hrsday
िजरसथजन Rajasthan 0630 hrsday 0630 hrsday
उतति परिश Uttar Pradesh 2157 hrsday 2157 hrsday
उततिजखड Uttarakhand 2359 hrsday 2359 hrsday
पशचिमी कषतर Western Region
छततीसगढ़ Chhattisgarh 18 hrsday 18 hrsday
गरिजत Gujarat 8 hrsday 8 hrsday
मधय परिश Madhya Pradesh Three-Phase Supply(Irrigation)- 0953 hrs day Three-Phase
(Mixed) Supply - 2334 hrs day
Three-Phase Supply(Irrigation)- 0953 hrs day Three-Phase
(Mixed) Supply - 2334 hrs day
महजिजषटर Maharashtra Three-Phase Supply(Irrigation)- 9 hrs day Three-Phase Supply(Irrigation)- 9 hrs day
गोवज Goa No restriction No restriction
दकषकषणी कषतर Southern Region
आनधर परिश Andhra Pradesh 07 hrsday 07 hrsday
तलगजनज Telangana 24 hrsday 24 hrsday
कनजाटक Karnataka 6 hrsday 6 hrsday
किल Kerala No Restrictions No Restrictions
तममल नजड Tamil Nadu 9 hrsday (6 hrs during day time and 3 hrs during night time) 9 hrsday (6 hrs during day time and 3 hrs during night time)
पडचिी Puducherry No Restrictions No Restrictions
परवी कषतर Eastern Region
बबहजि Bihar 18 hrsday 18 hrsday
झजिखणड Jharkhand 20 hrsday 20 hrsday
ओडडशज Odisha 24 hrsday 24 hrsday
पशशचम बगजल West Bengal 23 hrsday 23 hrsday
28
मारच 2019 कषि कषतर को षिदयत आपरतच का षििरण Power Supply to Agricultural Sector during March2019
राजय कषतर State Regionऔसत वरवदयत आपरत ण घनरो म Average Hours of Supply
On segregated feeders
SNo Contents Page
1 Growth of Installed Capacity since 6th Plan 29
2 Progress of Transmission Sector since 6th Plan 30
3 All India Yearly Coal consumption for Power Generation (Utilities)
4 All India Annual Per Capita Consumption of Electricity since -2006
5 Average cost of power supply amp Average realisation (Paisakwh)
6 Growth of Rural Electrification amp Pump Sets Energisation
7 Status of Hydro Schemes Cleared by the CEA in Apr-2019
Section G - Growth of Power Sector
31
32
(In MW)
Coal Gas Diesel Total
End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472
End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634
End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537
End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596
End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921
End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703
End of 12th Plan 19216288 2532938 83763 21832988 6780 4447842 50018 31960630
Up to Apr-2019 20070450 2493722 63763 22627934 678000 4539922 7764163 35610019
Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-17) = 51529 MW
Electricity Generation (MU) Targets and Achievements for 2016-17
Coal Gas Diesel Nuclear Hydro Res Total
2007045 2493722 637629 678000 453992 77641625 22925174
29
1 Growth of Installed Capacity Since 6th Plan
Plan YearThermal
Nuclear Hydro RES (MNRE) Total
2007045
2493722637629
678000
4539922
77641625
Total Installed Capacity 35610019 MW
Coal Gas Diesel Nuclear Hydro Res
Progress of Transmission Sector in the Country up to April 2019
1 TRANSMISSION LINES (All fig in CKM)
At the end of
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
6th plan 0 0 0 0 0 0 0 0 0 0 0 0 1831 4198 0 6029 1641 44364 0 46005 3472 48562 0 52034
7th plan 0 0 0 0 0 0 0 0 0 0 0 0 13068 6756 0 19824 4560 55071 0 59631 17628 61827 0 79455
8th plan 0 0 0 0 1634 0 0 1634 0 0 0 0 23001 13141 0 36142 6564 73036 0 79600 31199 86177 0 117376
9th plan 0 0 0 0 3234 1504 0 4738 751 409 0 1160 29345 20033 0 49378 8687 88306 0 96993 42017 110252 0 152269
10th plan 0 0 0 0 4368 1504 0 5872 1775 409 0 2184 48708 24730 0 73438 9444 105185 0 114629 64295 131828 0 196123
11th Plan 0 0 0 0 5948 1504 1980 9432 4839 411 0 5250 71023 30191 5605 106819 10140 125010 830 135980 91950 157116 8415 257481
12th Plan 6124 0 0 6124 5948 1504 1980 9432 25465 1177 4598 31240 92482 48240 17065 157787 11014 151276 978 163268 141033 202197 24621 367851
13th Plan (Up
to Mar2019)6124 0 0 6124 5948 1504 1980 9432 33692 1512 6605 41809 101335 58238 21173 180746 11734 162552 1010 175296 158833 223806 30768 413407
13th Plan (Up
to Apr-19)6124 0 0 6124 5948 1504 1980 9432 33745 1512 6605 41862 101335 58258 21173 180766 11734 162953 1010 175697 158886 224227 30768 413881
27150 600 MW of 132 kV Inter-Regional power transmission capacity links which are operated radially from time to time is not added in the total
75050
47900
24000
99050
30
Grand Total
Note - The figure upto the end of 10th plan in for stringing progress including the lines not commissioned Now only commissioned lines are reckoned Accordingly the figure for 10th plan (end) may read
as 187555 after adjusting with (-) 10852 Ckm
Inter-regional Power Transfer Capacity (MW)
plusmn 800 kV HVDC plusmn 500 kV HVDC 765 kV 400 kV 220 kV
IR addition in 12th
Plan (up to March
2017)
Inter-regional
Transmission
Capacity at the end
of Plan Period 2017-
22 (as on April19)
IR at the end of 11th
PlanIR at the end of 12th
Plan
IR Capacity Addition
at the end of Plan
Period 2017-22 (Till
April 19)
2004-05 27800
2005-06 28100
2006-07 30200
2007-08 33000
2008-09 35500
2009-10 36700
2010-11 38700
2011-12 41756
2012-13 45460
2013-14 48940
2014-15 53040
2015-16 54590
2016-17 57430
2017-18 60800
2018-19 62890
Year
2005-06
2006-07
2007-08
2008-09
2009-10
2010-11
2011-12
2012-13
2013-14
2014-15
2015-16
2016-17
2017-18
2018-19
2004-05 254 209 7568
2005-06 260 221 7636
2006-07 276 227 7423
2007-08 293 239 7727
2008-09 340 263 8713
2009-10 355 268 8870
2010-11 398 303 11975
2011-12 455 330 13514
2012-13 501 376 14867
2013-14 518 175
2014-15 520
Source- PFC Reports on the performance of State Power Utilities 31
1181
7335
7786
91441
8188
88363
957
1010
1075
1122
1149
(GrossGen+ Net Import) Mid-year population Provisional
5 Average cost of power supply amp average realization ( paiseKWH )
Yearcost of supply
(paiseunit)
Realization(paiseunit)
Including AgricultureOnly
Agriculture
6719
7171
3 All India yearly Coal Consumption for Power Generation (Utilities)
YEARCoal Consumption
Million Tonnes
4 All India Annual per Capita consumption of Electricity Since 2006
Per Capita Consumption ( kWh)
6314
Sl
NoExecuting Agency
Installed
Capacity (MW)Cost (Rs crore)
Date of
Clearance
32
Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as
Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received
from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made
available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified
villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is
independent of the earlier published reports
No Hydro Electric Project has been issued concurrenceAppraisal letter by CEA during April 2019
7 Status of Hydro Schemes Cleared by the CEA in Apr-2019
Name of Scheme
1999-002000-01
297594
010408 to 310309010409 to 310310
10th Plan
2005-062006-07
322968331020
6 Growth Of Rural Electrification amp Pumpsets Energisation
Plan Year
9th Plan2002-03
134092626
4111
Pump Sets Energised Villages Electricfied (Nos)
2001-02
284064367244
1218
27801997-981998-99
3207
482864
12632
1576036
4451722594
15455554
2314176
397343611750
2093311060316074
65109527813884
46708
18423975
499150
2003-042004-05
5743
9769
Cumu upto End of 10th Plan
010407 to 310308
010410 to 310311557976840909
010411 to 310312
412667
86293726
No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification
since 2004-05
65291374575 296361511th Plan
Cumu upto End of 11th Plan
596556 21212860
557439Cummulative up to end of 12th Plan
SN Contents Page
1 Rate of sale of power for the year 2016-17 33-41
RATE OF SALE OF POWER FOR THE YEAR 2016-17
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) NORTHERN REGION
CENTRAL SECTOR
BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 18000 66900 19800
CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 54000 222400 21600
CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 30000 144400 19600
CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 23100 91700 42600
PARBATI - III HPS NHPC LTD HYDRO-HYDRO 52000 68200 54800
DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 28000 95600 30000
CHUTAK NHPC LTD HYDRO-HYDRO 4400 22000 79800
DULHASTI HPS NHPC LTD HYDRO-HYDRO 39000 228000 56400
SALAL HPS NHPC LTD HYDRO-HYDRO 69000 342300 11000
TANAKPUR HPS NHPC LTD HYDRO-HYDRO 9420 43000 29600
URI HPS -I NHPC LTD HYDRO-HYDRO 48000 280300 16000
URI HPS - II NHPC LTD HYDRO-HYDRO 24000 147300 48600
NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 4500 24600 88200
SEWA - II NHPC LTD HYDRO-HYDRO 12000 47100 43400
ANTA CCPP NTPC LTD THERMAL-GASN 41930 67539 32400
AURAIYA CCPP NTPC LTD THERMAL-GASN 66336 53501 39100
BADARPUR TPS NTPC LTD THERMAL-COAL 70500 159153 44800
DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 84000 296170 42300
DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 98000 526686 46300
DADRI CCPP NTPC LTD THERMAL-GASHSD 82978 227469 33000
FARIDABAD CCPP NTPC LTD THERMAL-GASN 43159 115577 30800
RIHAND STPS I NTPC LTD THERMAL-COAL 100000 596766 24500
RIHAND STPS II NTPC LTD THERMAL-COAL 100000 737069 24600
RIHAND STPS III NTPC LTD THERMAL-COAL 100000 706546 30600
SINGRAULI STPS NTPC LTD THERMAL-COAL 200000 1394068 20400
TANDA TPS NTPC LTD THERMAL-COAL 44000 295438 40800
UNCHAHAR TPS I NTPC LTD THERMAL-COAL 42000 256454 39800
UNCHAHAR TPS II NTPC LTD THERMAL-COAL 42000 273577 38900
UNCHAHAR TPS III NTPC LTD THERMAL-COAL 21000 142780 43000
KOLDAM NTPC LTD HYDRO-HYDRO 80000 363260 43600
NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 303575 25841
RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 108000 668677 35374
NJHPS SJVNL HYDRO-HYDRO 150000 699496 23820
RAMPUR HPS SJVNL HYDRO-HYDRO 41202 195982 32260
TEHRI HPP THDC HYDRO-HYDRO 100000 272543 51800
KOTESHWAR HEP THDC HYDRO-HYDRO 40000 106244 53400
IGSTPS JHAJJAR ARAVALI P CPL THERMAL-COAL 150000 510429 49490
NEYVELI BARSINGSAR NEYVELI LIG CORP LTD THERMAL-LIG 25000 127520 38040
STATE SECTOR
PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 21000 14222 48200
PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 21000 19205 48400
PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 25000 102257 42600
PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 25000 62107 41800
DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 60000 312213 41000
RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 120000 35767442200
WYC HYDEL STATION HPGCL HYDRO-HYDRO 6240 20365 24900
GIRI POWER HOUSE HPSEB HYDRO-HYDRO 6000 13958 7600
ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 1695 5467 11900
BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 12000 18528 6700
GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 2250 7462 22500
BASSI POWER HOUSE HPSEB HYDRO-HYDRO 6600 29649 7500
BINWA POWER HOUSE HPSEB HYDRO-HYDRO 600 2749 19300
ANNEXURE-I
RATE OF SALE OF POWER FOR THE YEAR 2016-2017
Page 33
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) GAJ POWER HOUSE HPSEB HYDRO-HYDRO 1050 2914 26700
BANER POWER HOUSE HPSEB HYDRO-HYDRO 1200 2864 16200
HOLI POWER HOUSE HPSEB HYDRO-HYDRO 300 616 22500
THIROT POWER HOUSE HPSEB HYDRO-HYDRO 450 1126 22500
KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 1200 3064 22500
LARJI POWER HOUSE HPSEB HYDRO-HYDRO 12600 53677 23700
NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 250 750 31000
CHABA POWER HOUSE HPSEB HYDRO-HYDRO 175 465 23300
RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 150 101 13400
SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 200 000 22500
KILLAR HPSEB HYDRO-HYDRO 030 050 22500
BHABA AUGUMENP H HPSEB HYDRO-HYDRO 450 1276 22500
BS CHAMBA HPSEB HYDRO-HYDRO 045 099 19500
GUMMA HPSEB HYDRO-HYDRO 300 423 22500
GAS TURBINE POWER STATION IPGCL THERMAL-GAS 27000 67233 39300
PPS-I PPCL THERMAL-GAS 33000 175905 38300
PPS-III PPCL THERMAL-GAS 137120 196879 36100
LOWER JHELUM JampKPDD HYDRO-HYDRO 10500 60214 5100
UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 2260 10514 6300
UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 10500 44202 8500
GANDHARBAL JampKPDD HYDRO-HYDRO 1500 8925 4700
KARNAH MPH JampKPDD HYDRO-HYDRO 200 1122 31000
CHENANI I JampKPDD HYDRO-HYDRO 2330 10892 6600
CHENANI II JampKPDD HYDRO-HYDRO 200 1188 9300
CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 750 3634 14200
IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 375 2108 18500
IGO MERCHELLONG JampKPDD HYDRO-HYDRO 300 1572 29700
PAHALGAM MHP JampKPDD HYDRO-HYDRO 450 1713 32900
MARPACHOO JampKPDD HYDRO-HYDRO 075 375 29800
HAFTAL JampKPDD HYDRO-HYDRO 100 483 28700
SANJAK JampKPDD HYDRO-HYDRO 126 441 36000
SEWA-III JampKPDD HYDRO-HYDRO 900 3273 20200
BHADERWAH JampKPDD HYDRO-HYDRO 150 935 8900
BAZGO JampKPDD HYDRO-HYDRO 030 108 33300
SUMOOR JampKPDD HYDRO-HYDRO 010 045 35400
HUNDER JampKPDD HYDRO-HYDRO 040 176 26200
STAKNA JampKPDD HYDRO-HYDRO 400 1933 4100
KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 124000 662879 31360
SURATGARH TPS RRVUNL THERMAL-COAL 150000 402328 41730
CHHABRA TPS 1amp 2 RRVUNL THERMAL-COAL 50000 305946 36700
CHHABRA TPS 3 RRVUNL THERMAL-COAL 25000 151536 36700
CHHABRA TPS 4 RRVUNL THERMAL-COAL 25000 155896 36700
RAMGARH GT POWER PROJECT RRVUNL THERMAL-COAL 22050 43177 41800
RAMGARH GAS T P PROJECT 3 RRVUNL THERMAL-GAS 5000 93615 41800
DHOLPUR C C POWER PROJECT RRVUNL THERMAL-R-LNG 33000 9486 46110
MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 14000 20855 34192
MINI MICRO HYDEL (MMH) P S RRVUNL HYDRO-HYDRO 2385 851 37800
KALISINDH TPP 1 RRVUNL THERMAL-COAL 60000 341543 45000
KALISINDH TPP 2 RRVUNL THERMAL-COAL 60000 211588 45000
KHARA HEP UPJVNL HYDRO-HYDRO 7200 26654 7200
MATATILLA HEP UPJVNL HYDRO-HYDRO 3060 12219 6500
OBRA HEP UPJVNL HYDRO-HYDRO 9900 21517 6300
RIHAND UPJVNL HYDRO-HYDRO 30000 57369 5500
ANPARA A TPS UPRVUNL THERMAL-COAL 63000 317536 27000
ANPARA B TPS UPRVUNL THERMAL-COAL 100000 705605 22700
ANPARA D UPRVUNL THERMAL-COAL 100000 300158 39800
HARDUAGANJ TPS UPRVUNL THERMAL-COAL 16500 45817 49200
HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 50000 304389 46600
OBRA A TPS UPRVUNL THERMAL-COAL 28800 13158 34000
OBRA B TPS UPRVUNL THERMAL-COAL 100000 328124 21900
Page 34
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) PANKI TPS UPRVUNL THERMAL-COAL 21000 66488 50300
PARICHHA TPS UPRVUNL THERMAL-COAL 22000 38762 49400
PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 42000 231931 45600
PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 50000 276722 50400
CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 24000 70845 8290
CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 14400 75366 8390
DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 3375 9595 12080
DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 5100 18701 10520
KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4140 17359 12330
KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 12000 33001 9420
KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 3000 11953 8320
TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 9000 33983 12460
MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 30400 124510 16110
RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 19800 17897 10550
MPUR UTTARAKHAND JVNL HYDRO-HYDRO 930 5121 19200
PATHRI UTTARAKHAND JVNL HYDRO-HYDRO 2040 11636 14200
GALOGI UTTARAKHAND JVNL HYDRO-HYDRO 300 648 12500
PRIVATE SECTOR
MGTPP CLP INDIA PVT LTD THERMAL-COAL 132000 268902 41940
SHRINAGAR HEP ALAKNANDA HPCL HYDRO-HYDRO 33000 127414 48800
GAMA INFRAPROP CCPP GAMA INFRAPROP PVT THERMAL-GAS 22500 52686 47000
PPGCL (BARA) JP POWER VENTURES LTD THERMAL-COAL 198000 448200 38500
MALANA HEP MALANA PCL HYDRO-HYDRO 8600 26354 29792
MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 10000 30369 32580
ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 19200 56347 36079
KASHANG HEP H P PCL HYDRO-HYDRO 19500 5034 29200
BASPA-II HEP HBPCL HYDRO-HYDRO 30000 132769 13600
KARCHAM WANGTOO HEP HBPCL HYDRO-HYDRO 100000 434386 36600
RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 108000 582600 43700
RITHALA COMBI CY POWER PLANT TATA POWER DDL THERMAL-GAS 9480 000 11900
RAJPURA TPS NABHA POWER LTD THERMAL-GAS 140000 901484 39000
TALWANDI SABO POWER LTD TALWANDI SABO POWER LTD THERMAL-COAL 198000 636040 49548
ROJA THERMAL POWER STATION ROJA POWER SCL THERMAL-COAL 120000 727200 43400
KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 34400 63400
BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 36000 62600
MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 38200 60800
UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 37900 61500
KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 42300 58800
LALITPUR PGCL BAJAJ ENERGY PVT LTD THERMAL-COAL 198000 359400 47300
PRAYAGRAJ PGCL PRAYAGRAJ PGCL THERMAL-COAL 132000 448200 38595
KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 132000 783182 33438
WESTERN REGION
CENTRAL SECTOR
INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 100000 325333 23892
OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 52000 141663 34001
GANDHAR CCPP NTPC LTD THERMAL-GAS 65739 221924 28700
KAWAS CCPP NTPC LTD THERMAL-GASN 65620 167929 27000
KORBA I amp II NTPC LTD THERMAL-COAL 210000 1499171 20500
KORBA III NTPC LTD THERMAL-COAL 50000 358746 26600
SIPAT STPS I NTPC LTD THERMAL-COAL 198000 1479902 26800
SIPAT STPS II NTPC LTD THERMAL-COAL 100000 766549 26500
VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 126000 693142 25800
VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 100000 608781 23800
VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 100000 673475 27600
VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 100000 655924 32900
VINDHYACHAL STPS V NTPC LTD THERMAL-COAL 50000 328265 31700
MOUDA I NTPC LTD THERMAL-COAL 100000 343130 44500
MOUDA Ii NTPC LTD THERMAL-COAL 66000 40637 39900
RATNAGIRI GAS amp POWER PVT LTD RGPPL THERMAL-GAS 196708 442485 47000
KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 000 24729
TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 32000 201227 10740
Page 35
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 365122 19069
TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 787444 29324
STATE SECTOR
GSEG-HAZIRA15610 MW GUJARAT S ENEGEN LTD THERMAL-GAS 15610 1805 28200
GSEG-HAZIRA35143 MW GUJARAT S ENEGEN LTD THERMAL-GAS 35130 22276 51300
GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 21978 51800
AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 13929 26100
KORBA TPS EAST CSPGCL THERMAL-COAL 44000 198673 33880
DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 365808 27570
KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 316500 30420
HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 532878 19410
CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 515 58300
MTTPS CHAMPA U-I CSPGCL THERMAL-COAL 50000 220376 39000
MTTPS CHAMPA U-II CSPGCL THERMAL-COAL 50000 23709 10000
SHP GANGREL CSPGCL HYDRO-HYDRO 1000 2350 36790
BANGO HEP CSPGCL HYDRO-HYDRO 12000 14662 8900
MHP KORBA WEST CSPGCL HYDRO-HYDRO 170 859 38190
SIKASAR HEP CSPGCL HYDRO-HYDRO 700 418 26870
DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8843 74500
DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 19446 51500
GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 66388 71600
GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127488 41300
KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 96072 43900
KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 29841 56400
SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 184966 58800
UKAI 1-5 GSECL THERMAL-COAL 85000 204891 46900
UKAI TPS 6 GSECL THERMAL-COAL 50000 284448 48200
WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 271999 58300
WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 82808 44100
KADANA HPS GSECL HYDRO-HYDRO 24200 34433 16800
UKAI HPS GSECL HYDRO-HYDRO 30500 40585 6100
TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 123000 11500
BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 8900 10900
BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 7200 27500
JHINNA HPS MPPGCL HYDRO-HYDRO 2000 9700 18500
RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 44300 3400
GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 17300 4600
SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 4100 16900
MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 14600 27000
PENCH HPS MPPGCL HYDRO-HYDRO 16000 23700 8100
RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 3000 16900
AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 134400 35100
SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 283800 38700
SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 344600 34300
SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 111600 61600
SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 211800 58000
SSTPS PH-I MPPGCL THERMAL-COAL 120000 233100 84300
BHUSAWAL TPS MSPGCL THERMAL-COAL 142000 566258 51100
CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1365682 33700
KHAPERKHEDA MSPGCL THERMAL-COAL 134000 706207 39100
KORADI TPS MSPGCL THERMAL-COAL 62000 443206 42000
NASIK TPS MSPGCL THERMAL-COAL 63000 297275 47000
PARLI TPS MSPGCL THERMAL-COAL 113000 175934 71600
PARAS MSPGCL THERMAL-COAL 50000 267931 38700
URAN CCPP MSPGCL THERMAL-GAS 67200 320330 30600
KOYANA MSPGCL HYDRO-HYDRO 195600 328155 13100
SMALL HYDRO POWER PLANTS MSPGCL HYDRO-HYDRO 45400 93062 30500
BHIRA MSPGCL HYDRO-HYDRO 8000 10046 8400
TILLARI MSPGCL HYDRO-HYDRO 8900 10584 3100
SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 233298 20500
SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 87633 20500
PRIVATE SECTOR
Page 36
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 81282 46750
JNSTPP(JAYPEE NIGRIE) JP POWER VENTURES LTD THERMAL-COAL 132000 726695 29310
MB POWER MB POWER THERMAL-COAL 120000 345632 38310
ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 754922 28671
ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 780761 23495
ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 198000 1263784 32090
ADANI POWER MAHARA ADANI POWER LTD THERMAL-COAL 330000 1666191 34124
AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 170065 36827
SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 252035 45129
ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 458551 36000
ESSAR POWER MP LTD ESSAR POWER MP LTD THERMAL-COAL 60000 243040 28600
VEDANTA LTD (P P -I) VEDANTA LTD THERMAL-GAS 3000 15044 24000
VEDANTA LTD (P P -II) VEDANTA LTD THERMAL-GAS 3000 21293 24000
PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 8234600 24000
165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 5850 64390
145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 68717 40349
SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 132655 28776
SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 144686 38567
MUNDRA UMPPCOASTAL GUJARAT POWER
LTD THERMAL-IMP COAL 400000 2530300
23900
LANCO AMARKANTAK TPP PATHADIH
U-ILANCO AMARKAN POWER LTD THERMAL-COAL 30000 195500
29200
LANCO AMARKANTAK TPP PATHADIH
U-IILANCO AMARKAN POWER LTD THERMAL-COAL 30000 206900
27600
BARADARHA TPS D B POWER LTD THERMAL-COAL 120000 677373 29200
JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 405000 28900
JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 453000 40500
DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 339437 40700
TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 293400 44000
TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 137200 37000
TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 174900 44000
BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 92900 14100
BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23700 34300
KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 27600 48300
CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2530300 23900
BHANDARDRA HEP -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 2475 54900
SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 161400 26500
SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 445000 39000
SOTHERN REGION
CENTRAL SECTOR
NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 325699 54820
NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 305532 39880
NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 998805 38510
NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 113016 54070
NEYVELI TAMILNADU POWER LTD JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 625274 42200
VALLUR TPS NTPC TECL THERMAL-COAL 150000 856438 42350
R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 1493 84300
RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1502919 29400
RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 341291 31800
SIMHADRI I NTPC LTD THERMAL-COAL 100000 688382 36800
SIMHADRI II NTPC LTD THERMAL-COAL 100000 663657 43400
KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 593110 31324
MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 291625 21764
KKNPP-1 amp 2 NPCIL NUCLEAR-NUCLEAR 200000 572609 40948
MINICOY LAKSHADEEP THERMAL-DIESEL 340 770 29600
KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1097 29600
AMINI LAKSHADEEP THERMAL-DIESEL 265 509 29600
ANDROTT LAKSHADEEP THERMAL-DIESEL 219 524 29600
KALPENI LAKSHADEEP THERMAL-DIESEL 175 356 29600
AGATTI LAKSHADEEP THERMAL-DIESEL 195 658 29600
KADMAT LAKSHADEEP THERMAL-DIESEL 190 414 29600
KILTAN LAKSHADEEP THERMAL-DIESEL 150 269 29600
CHETLET LAKSHADEEP THERMAL-DIESEL 100 139 29600
BITRA LAKSHADEEP THERMAL-DIESEL 043 024 29600
BANGARAM LAKSHADEEP THERMAL-DIESEL 018 009 29600
Page 37
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) STATE SECTOR
Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 721811 46500
Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 50000 336142 46500
RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 237358 46500
RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 239926 46500
RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 124500 46500
SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 62109 46500
UPPER SILERU APGENCO HYDRO-HYDRO 24000 33000 46500
LOWER SILERU APGENCO HYDRO-HYDRO 46000 81066 46500
DONKARAI APGENCO HYDRO-HYDRO 2500 6007 46500
PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 1262 46500
CHETTIPETA APGENCO HYDRO-HYDRO 100 214 46500
MUCHKUND APGENCO HYDRO-HYDRO 12000 37571 46500
NAGARJUNASAGAR RCPH APGENCO HYDRO-HYDRO 9000 606 46500
TUNGABHADRA HES amp HAMPI(AP
Share)
APGENCO HYDRO-HYDRO 7200 6100 46500
KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 352232 42600
KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 288131 32500
KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 319272 46500
RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 40073 44300
KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 308317 46000
KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 308963 51300
SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 61004 76600
NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 17960 75300
PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 20873 58300
POCHAMPAD-I TSPGENCO HYDRO-HYDRO 2700 5455 29800
POCHAMPAD-II TSPGENCO HYDRO-HYDRO 900 1932 40700
NIZAMSAGAR TSPGENCO HYDRO-HYDRO 1000 1126 53400
RAICHUR TPS 1 to 7 KPCL THERMAL-COAL 147000 890866 43800
RAICHUR TPS 8 KPCL THERMAL-COAL 25000 159523 48200
BELLARI TPS 1 KPCL THERMAL-COAL 50000 318679 51100
BELLARI TPS 2 KPCL THERMAL-COAL 50000 232347 55600
BELLARI TPS 3 KPCL THERMAL-COAL 70000 47565 34400
BHADRA PH KPCL HYDRO-HYDRO 3920 2369 45900
GERUSUPPA PH KPCL HYDRO-HYDRO 24000 26990 22000
GHAT PRABHA HEP KPCL HYDRO-HYDRO 3200 4777 25300
KADRA HPS KPCL HYDRO-HYDRO 15000 16889 26800
NAGJHARI KPCL HYDRO-HYDRO 90000 155159 9800
KODASALLI DPH KPCL HYDRO-HYDRO 12000 14854 19200
MUNIRA+MGH+SPH+SPH KPCL HYDRO-HYDRO 22640 48211 7900
SHARAVATHY HPS KPCL HYDRO-HYDRO 108550 276215 5400
ALMATTI DPH KPCL HYDRO-HYDRO 29000 39611 24600
VARAHI UGPH KPCL HYDRO-HYDRO 46000 71368 15600
IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 17196 15300
IDUKKI HPS KSEB HYDRO-HYDRO 78000 137905 15300
KAKKAD HPS KSEB HYDRO-HYDRO 5000 13063 15300
KALLADA HPS KSEB HYDRO-HYDRO 1500 4436 15300
KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 46544 15300
KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 635 15300
LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 30822 15300
MALANKARA HPS KSEB HYDRO-HYDRO 1050 2474 15300
MATTUPETTY KSEB HYDRO-HYDRO 200 230 15300
MALAMPUZHA KSEB HYDRO-HYDRO 250 063 15300
CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 864 15300
URUMI ST I amp II KSEB HYDRO-HYDRO 615 903 15300
LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 248 15300
NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7765 19625 15300
PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 16601 15300
PANNIAR HPS KSEB HYDRO-HYDRO 3240 6217 15300
PORINGALKUTHU KSEB HYDRO-HYDRO 3600 10052 15300
PORINGALKUTHU LBE KSEB HYDRO-HYDRO 1600 9438 15300
PEPPARA KSEB HYDRO-HYDRO 300 395 15300
POOZHITHODE KSEB HYDRO-HYDRO 480 1045 15300
Page 38
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) PEECHI KSEB HYDRO-HYDRO 125 040 15300
RANI-PERUNADU KSEB HYDRO-HYDRO 400 585 15300
SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 79783 15300
SENGULAM HPS KSEB HYDRO-HYDRO 5120 11558 15300
SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 16711 15300
VILANGAD KSEB HYDRO-HYDRO 750 1578 15300
BARAPOLE KSEB HYDRO-HYDRO 1500 1932 15300
VELLATHOOVAL KSEB HYDRO-HYDRO 360 305 15300
CHIM0NY KSEB HYDRO-HYDRO 250 156 15300
ADYANPARA KSEB HYDRO-HYDRO 350 501 15300
BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 554 15300
KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 3801 15300
KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 23132 32800
ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 14416 62280
METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 523970 62280
METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 321270 62280
NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 336575 62280
NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 591240 62280
TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 508966 62280
KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 30897 62280
VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 18720 90699 62280
KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 33593 62280
BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 1047 62280
PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 1250 62280
PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 330 62280
MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 4897 62280
MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 032 62280
KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15681 62280
KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 40608 62280
KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 21342 62280
KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 4717 62280
KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4322 62280
KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2399 62280
METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 4416 62280
METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 8035 62280
BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2187 62280
BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2359 62280
BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2511 62280
BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 1949 62280
BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 1819 62280
POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 172 62280
SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 241 62280
MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 026 62280
THIRUMOORTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 136 62280
PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 9309 62280
VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 353 62280
SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 4192 62280
PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 6571 62280
SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 1186 62280
SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6319 62280
ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 6122 62280
KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 28674 62280
SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 18381 62280
SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 4258 62280
KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 12680 62280
KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4201 62280
ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 000 62280
PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 19175 62280
AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 078 62280
BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 504 62280
BHAVANI KATTALAI (BKB)(IIIampIII BB I amp II)TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 5847 62280
PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 000 62280
Page 39
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) SRI DAMODARAM STPS APPDCL THERMAL-COAL 160000 808108 36300
PRIVATE SECTOR
KARUPPUR TANJORE LANCO TANJORE PCL THERMAL-GAS 12000 48096 28770
SIMHAPURI ENERGY LTD SIMHAPURI ENERGY LTD THERMAL-COAL 60000 143900 39100
JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 7111 45500
SBU 1 JSW ENERGY LTD
VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 26000 159100
43300
SBU 2 JSW ENERGY LTD
VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 60000 247900
42800
LANCO KPLLANCO KONDAPALLI POWER
LTDTHERMAL-GAS 36814 85060
25776
LANCO KPL STG -IILANCO KONDAPALLI POWER
LTDTHERMAL-GAS 36600 12979
46330
LANCO KPL STG -IIIALANCO KONDAPALLI POWER
LTDTHERMAL-GAS 37100 85710
46330
LANCO KPL STG -III BLANCO KONDAPALLI POWER
LTDTHERMAL-GAS 37100 43639
46330
HINDUJA NATIONAL PCL HINDUJA NATIONAL PCL THERMAL-COAL 104000 303000 38200
MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 121164 49940
UDUPI POWER COR LTD ADANI POWER LTD THERMAL-COAL 120000 754613 42500
SPECTRUM POWER GENERATION
LTD SPECTRUM PG LTD THERMAL-GASN 20525 9256812
34952
TAQA NEYVELI POWER COM PVT
LTD TAQA NEYVELI THERMAL-LIG 25000 5840
34500
ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 251000 51000
ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 207860 36800
GMR VEMAGIRI POWER GENERATION
LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 30117
46450
EASTERN REGION
CENTRAL SECTOR
MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 64675 53113
MTPS STAGE - II KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 39000 1432 69138
BOKARO `B` TPS DVC THERMAL-COAL 63000 145670 31539
MEJIA TPS U 1-3 DVC THERMAL-COAL 63000 348298 31552
MEJIA TPS U 4 DVC THERMAL-COAL 21000 116099 34997
MEJIA TPS U 5-6 DVC THERMAL-COAL 50000 276427 35976
MEJIA TPS U 7-8 DVC THERMAL-COAL 100000 552854 36991
DURGAPUR STEEL TPS DVC THERMAL-COAL 100000 665550 39323
DURGAPUR TPS DVC THERMAL-COAL 21000 59270 35416
RAGHUNATHPUR TPS DVC THERMAL-COAL 120000 201650 35326
MAITHON HYDEL STA DVC HYDRO-HYDRO 6320 12200 17984
CHANDRAPURA TPSU1-3 DVC THERMAL-COAL 42000 257610 35095
CHANDRAPURA TPSU7-8 DVC THERMAL-COAL 50000 306673 34987
KODERMA TPS DVC THERMAL-COAL 100000 380180 38131
PANCHET HPS DVC HYDRO-HYDRO 8000 13360 17984
TILLAYA HPS DVC HYDRO-HYDRO 400 1410 17984
RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34700 35400
TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 277300 23200
TLDP -III NHPC LTD HYDRO-HYDRO 13200 55400 62000
TLDP -IV NHPC LTD HYDRO-HYDRO 16000 60300 25600
FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 957219 33700
FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 308943 41000
BONGAINGAON TPS NTPC LTD THERMAL-COAL 25000 153663 58600
KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 542277 34200
KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 942591 34200
BARH-II NTPC LTD THERMAL-COAL 132000 728021 44500
TALCHER TPS NTPC LTD THERMAL-COAL 46000 335521 30100
TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 702319 25600
TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1436521 24700
STATE SECTOR
BTPS(RampM) BIHAR STATE PGCL THERMAL-COAL 22000 12142 39700
BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 98331 10602
HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 50593 9482
CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 19689 2605
RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 53192 6033
UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 147208 14637
Page 40
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 60353 4519
IB TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 288567 25000
J P H GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 210 038 61100
MEYONG CHU GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 400 1086 61100
TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 122667 38200
DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 214339 43321
KOLAGHAT THERMAL POWER
STATION
WEST BENGAL PDCL THERMAL-COAL 126000 538269 31603
BAKRESHWAR THERMAL POWER
PLANT
WEST BENGAL PDCL THERMAL-COAL 105000 634876 32154
BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 45000 166855 33299
SANTHALDIH THERMAL POWER
STATION
WEST BENGAL PDCL THERMAL-COAL 50000 336442 34932
SAGARDIGHI THERMAL POWER
PROJECT
WEST BENGAL PDCL THERMAL-COAL 160000 423121 34705
JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 20344 68900
RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 24559 68900
TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 4623 68900
PURULIA PUMPED STORAGE
PROJECT
WEST BENGAL SEDCL HYDRO-HYDRO 90000 108816 68900
MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2768 68900
PRIVATE SECTOR
CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 49474 20230
CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 555500 70200
HALDIA ENERGY HALDIA ENERGY LTD THERMAL-COAL 60000 371000 50400
DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3688 63400
KAMALANGA TPS GMR KAMALANGA ENERGY LTD THERMAL-COAL 105000547670
33300
ADHUNIK POWER U-1 ADHUNIK POWER THERMAL-COAL 27000 158 44060
ADHUNIK POWER U-2 ADHUNIK POWER THERMAL-COAL 27000 168 44250
VL-JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 332800 23622
JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 43000 45250
JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 71700 37030
JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 70700 35920
JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 71100 38870
JOJOBERA UNIT 5 TATA POWER COM LTD THERMAL-COAL 12000 79300 44560
JOJOBERA UNIT 6 TATA POWER COM LTD THERMAL-WHR 12000 83700 12840
IEL KALINGANAGAR U-I TATA POWER COM LTD THERMAL-WG 6750 33400 22500
IEL KALINGANAGAR U-II TATA POWER COM LTD THERMAL-WG 6750 34800 22500
MAITHON UNIT 1 amp 2 TATA POWER COM LTD THERMAL-COAL 105000 678000 36100
HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 27500 24340
HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 28400 24340
HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 15800 24310
NORTH EASTERN REGION
CENTRAL SECTOR
LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 74100 36600
AGARTALA GT NEEPCO THERMAL-GAS 13500 88611 27210
ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 153111 32310
DOYANG HEP NEEPCO HYDRO-HYDRO 7500 25598 49801
KOPILI HEP NEEPCO HYDRO-HYDRO 20000 98186 11491
KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 19582 20237
KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 10310 17968
RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 124093 22945
TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 10100 17344 39000
STATE SECTOR
HYDRO POWER (122 Stns) ITANAGAR GOVT OF ARUNACHAL
PRADESHHYDRO-HYDRO 6971 6217270
24600
KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39514 17337
LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 82327 36810
NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 33318 48290
MYNTRIANG SHEP ST II ASSAM POWER GENCO HYDRO-HYDRO 300 567 35776
LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 9130 49200
LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 012 49200
DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 022 49200
TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 000 49200
UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 4990 16000
UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 6476 37000
UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 16494 14600
UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 3600 9556 15000
SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 758 8000
MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44070 44800
KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 154 41400
TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 091 41400
MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 411 41400
MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 394 41400
KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 760 41400
SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 3264 41400
LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 044 41400
BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 18953 28000
ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 43585 28200
GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 4080 11100
Note
LIG Lignite N Naptha WHR Waste Heat Recovery
Page 41
अपरल 2019 April2019 अपरल2018 -मािण2019 April2019 to April2019
उततरी कषतर Northern Region
चडीगढ़ Chandigarh(Data Not Received)दिलली Delhi
हरियजणज Haryana
दहमजचल परिश Himachal Pradeshरमम कशमीि Jammu amp Kashmir(Data
Not Received)परजब Punjab
िजरसथजन Rajasthanउतति परिश Uttar Pradesh
उततिजखड Uttarakhand
पशचिमी कषतर Western Region
छततीसगढ़ Chhattisgarh
Apr-Nov 2018- No cuts
Maximum Demand cut-58MW
Energy cut- 00020-00032 MUsday
गरिजत Gujarat
मधय परिश Madhya Pradesh
महजिजषटर Maharashtra
गोवज Goa
दकषकषणी कषतर Southern Region
आनधर परिश Andhra Pradesh
तलगजनज Telangana
कनजाटक Karnataka
किल Kerala
तममल नजड Tamil Nadu
पडचिी Puducherryपरवी कषतर Eastern Region
बबहजि Bihar
झजिखणड Jharkhand
ओडडशज Odisha
पशशचम बगजल West Bengal
No N
otifie
d Cu
ts
27
मािण 2019 म इडथरीर पर वरवदयत करौती का वरवरवरण Notified Power CutsRestrictions on Industries during April2019
राजय कषतर State Regionऊराणमाग करौती EnergyDemand Cut
No N
otifie
d Cu
tsNo
Notifie
d Cu
ts
अपरल2019 April 2019 अपरल2019 -अपरल2019 April2019 to April2019
उततरी कषतर Northern Region
चडीगढ़ Chandigarh Data not received Data not received
दिलली Delhi Data not received Data not received
हरियजणज Haryana 0811 hrsday 0811 hrsday
दहमजचल परिश Himachal Pradesh HPSEBL has only 2 agriculture consumers and uninterrupted
power is being supplied to agriculture sector
HPSEBL has only 2 agriculture consumers and uninterrupted
power is being supplied to agriculture sector
रमम कशमीि Jammu amp Kashmir Data not received Data not received
परजब Punjab 379 hrsday 379 hrsday
िजरसथजन Rajasthan 0630 hrsday 0630 hrsday
उतति परिश Uttar Pradesh 2157 hrsday 2157 hrsday
उततिजखड Uttarakhand 2359 hrsday 2359 hrsday
पशचिमी कषतर Western Region
छततीसगढ़ Chhattisgarh 18 hrsday 18 hrsday
गरिजत Gujarat 8 hrsday 8 hrsday
मधय परिश Madhya Pradesh Three-Phase Supply(Irrigation)- 0953 hrs day Three-Phase
(Mixed) Supply - 2334 hrs day
Three-Phase Supply(Irrigation)- 0953 hrs day Three-Phase
(Mixed) Supply - 2334 hrs day
महजिजषटर Maharashtra Three-Phase Supply(Irrigation)- 9 hrs day Three-Phase Supply(Irrigation)- 9 hrs day
गोवज Goa No restriction No restriction
दकषकषणी कषतर Southern Region
आनधर परिश Andhra Pradesh 07 hrsday 07 hrsday
तलगजनज Telangana 24 hrsday 24 hrsday
कनजाटक Karnataka 6 hrsday 6 hrsday
किल Kerala No Restrictions No Restrictions
तममल नजड Tamil Nadu 9 hrsday (6 hrs during day time and 3 hrs during night time) 9 hrsday (6 hrs during day time and 3 hrs during night time)
पडचिी Puducherry No Restrictions No Restrictions
परवी कषतर Eastern Region
बबहजि Bihar 18 hrsday 18 hrsday
झजिखणड Jharkhand 20 hrsday 20 hrsday
ओडडशज Odisha 24 hrsday 24 hrsday
पशशचम बगजल West Bengal 23 hrsday 23 hrsday
28
मारच 2019 कषि कषतर को षिदयत आपरतच का षििरण Power Supply to Agricultural Sector during March2019
राजय कषतर State Regionऔसत वरवदयत आपरत ण घनरो म Average Hours of Supply
On segregated feeders
SNo Contents Page
1 Growth of Installed Capacity since 6th Plan 29
2 Progress of Transmission Sector since 6th Plan 30
3 All India Yearly Coal consumption for Power Generation (Utilities)
4 All India Annual Per Capita Consumption of Electricity since -2006
5 Average cost of power supply amp Average realisation (Paisakwh)
6 Growth of Rural Electrification amp Pump Sets Energisation
7 Status of Hydro Schemes Cleared by the CEA in Apr-2019
Section G - Growth of Power Sector
31
32
(In MW)
Coal Gas Diesel Total
End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472
End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634
End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537
End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596
End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921
End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703
End of 12th Plan 19216288 2532938 83763 21832988 6780 4447842 50018 31960630
Up to Apr-2019 20070450 2493722 63763 22627934 678000 4539922 7764163 35610019
Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-17) = 51529 MW
Electricity Generation (MU) Targets and Achievements for 2016-17
Coal Gas Diesel Nuclear Hydro Res Total
2007045 2493722 637629 678000 453992 77641625 22925174
29
1 Growth of Installed Capacity Since 6th Plan
Plan YearThermal
Nuclear Hydro RES (MNRE) Total
2007045
2493722637629
678000
4539922
77641625
Total Installed Capacity 35610019 MW
Coal Gas Diesel Nuclear Hydro Res
Progress of Transmission Sector in the Country up to April 2019
1 TRANSMISSION LINES (All fig in CKM)
At the end of
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
6th plan 0 0 0 0 0 0 0 0 0 0 0 0 1831 4198 0 6029 1641 44364 0 46005 3472 48562 0 52034
7th plan 0 0 0 0 0 0 0 0 0 0 0 0 13068 6756 0 19824 4560 55071 0 59631 17628 61827 0 79455
8th plan 0 0 0 0 1634 0 0 1634 0 0 0 0 23001 13141 0 36142 6564 73036 0 79600 31199 86177 0 117376
9th plan 0 0 0 0 3234 1504 0 4738 751 409 0 1160 29345 20033 0 49378 8687 88306 0 96993 42017 110252 0 152269
10th plan 0 0 0 0 4368 1504 0 5872 1775 409 0 2184 48708 24730 0 73438 9444 105185 0 114629 64295 131828 0 196123
11th Plan 0 0 0 0 5948 1504 1980 9432 4839 411 0 5250 71023 30191 5605 106819 10140 125010 830 135980 91950 157116 8415 257481
12th Plan 6124 0 0 6124 5948 1504 1980 9432 25465 1177 4598 31240 92482 48240 17065 157787 11014 151276 978 163268 141033 202197 24621 367851
13th Plan (Up
to Mar2019)6124 0 0 6124 5948 1504 1980 9432 33692 1512 6605 41809 101335 58238 21173 180746 11734 162552 1010 175296 158833 223806 30768 413407
13th Plan (Up
to Apr-19)6124 0 0 6124 5948 1504 1980 9432 33745 1512 6605 41862 101335 58258 21173 180766 11734 162953 1010 175697 158886 224227 30768 413881
27150 600 MW of 132 kV Inter-Regional power transmission capacity links which are operated radially from time to time is not added in the total
75050
47900
24000
99050
30
Grand Total
Note - The figure upto the end of 10th plan in for stringing progress including the lines not commissioned Now only commissioned lines are reckoned Accordingly the figure for 10th plan (end) may read
as 187555 after adjusting with (-) 10852 Ckm
Inter-regional Power Transfer Capacity (MW)
plusmn 800 kV HVDC plusmn 500 kV HVDC 765 kV 400 kV 220 kV
IR addition in 12th
Plan (up to March
2017)
Inter-regional
Transmission
Capacity at the end
of Plan Period 2017-
22 (as on April19)
IR at the end of 11th
PlanIR at the end of 12th
Plan
IR Capacity Addition
at the end of Plan
Period 2017-22 (Till
April 19)
2004-05 27800
2005-06 28100
2006-07 30200
2007-08 33000
2008-09 35500
2009-10 36700
2010-11 38700
2011-12 41756
2012-13 45460
2013-14 48940
2014-15 53040
2015-16 54590
2016-17 57430
2017-18 60800
2018-19 62890
Year
2005-06
2006-07
2007-08
2008-09
2009-10
2010-11
2011-12
2012-13
2013-14
2014-15
2015-16
2016-17
2017-18
2018-19
2004-05 254 209 7568
2005-06 260 221 7636
2006-07 276 227 7423
2007-08 293 239 7727
2008-09 340 263 8713
2009-10 355 268 8870
2010-11 398 303 11975
2011-12 455 330 13514
2012-13 501 376 14867
2013-14 518 175
2014-15 520
Source- PFC Reports on the performance of State Power Utilities 31
1181
7335
7786
91441
8188
88363
957
1010
1075
1122
1149
(GrossGen+ Net Import) Mid-year population Provisional
5 Average cost of power supply amp average realization ( paiseKWH )
Yearcost of supply
(paiseunit)
Realization(paiseunit)
Including AgricultureOnly
Agriculture
6719
7171
3 All India yearly Coal Consumption for Power Generation (Utilities)
YEARCoal Consumption
Million Tonnes
4 All India Annual per Capita consumption of Electricity Since 2006
Per Capita Consumption ( kWh)
6314
Sl
NoExecuting Agency
Installed
Capacity (MW)Cost (Rs crore)
Date of
Clearance
32
Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as
Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received
from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made
available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified
villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is
independent of the earlier published reports
No Hydro Electric Project has been issued concurrenceAppraisal letter by CEA during April 2019
7 Status of Hydro Schemes Cleared by the CEA in Apr-2019
Name of Scheme
1999-002000-01
297594
010408 to 310309010409 to 310310
10th Plan
2005-062006-07
322968331020
6 Growth Of Rural Electrification amp Pumpsets Energisation
Plan Year
9th Plan2002-03
134092626
4111
Pump Sets Energised Villages Electricfied (Nos)
2001-02
284064367244
1218
27801997-981998-99
3207
482864
12632
1576036
4451722594
15455554
2314176
397343611750
2093311060316074
65109527813884
46708
18423975
499150
2003-042004-05
5743
9769
Cumu upto End of 10th Plan
010407 to 310308
010410 to 310311557976840909
010411 to 310312
412667
86293726
No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification
since 2004-05
65291374575 296361511th Plan
Cumu upto End of 11th Plan
596556 21212860
557439Cummulative up to end of 12th Plan
SN Contents Page
1 Rate of sale of power for the year 2016-17 33-41
RATE OF SALE OF POWER FOR THE YEAR 2016-17
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) NORTHERN REGION
CENTRAL SECTOR
BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 18000 66900 19800
CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 54000 222400 21600
CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 30000 144400 19600
CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 23100 91700 42600
PARBATI - III HPS NHPC LTD HYDRO-HYDRO 52000 68200 54800
DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 28000 95600 30000
CHUTAK NHPC LTD HYDRO-HYDRO 4400 22000 79800
DULHASTI HPS NHPC LTD HYDRO-HYDRO 39000 228000 56400
SALAL HPS NHPC LTD HYDRO-HYDRO 69000 342300 11000
TANAKPUR HPS NHPC LTD HYDRO-HYDRO 9420 43000 29600
URI HPS -I NHPC LTD HYDRO-HYDRO 48000 280300 16000
URI HPS - II NHPC LTD HYDRO-HYDRO 24000 147300 48600
NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 4500 24600 88200
SEWA - II NHPC LTD HYDRO-HYDRO 12000 47100 43400
ANTA CCPP NTPC LTD THERMAL-GASN 41930 67539 32400
AURAIYA CCPP NTPC LTD THERMAL-GASN 66336 53501 39100
BADARPUR TPS NTPC LTD THERMAL-COAL 70500 159153 44800
DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 84000 296170 42300
DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 98000 526686 46300
DADRI CCPP NTPC LTD THERMAL-GASHSD 82978 227469 33000
FARIDABAD CCPP NTPC LTD THERMAL-GASN 43159 115577 30800
RIHAND STPS I NTPC LTD THERMAL-COAL 100000 596766 24500
RIHAND STPS II NTPC LTD THERMAL-COAL 100000 737069 24600
RIHAND STPS III NTPC LTD THERMAL-COAL 100000 706546 30600
SINGRAULI STPS NTPC LTD THERMAL-COAL 200000 1394068 20400
TANDA TPS NTPC LTD THERMAL-COAL 44000 295438 40800
UNCHAHAR TPS I NTPC LTD THERMAL-COAL 42000 256454 39800
UNCHAHAR TPS II NTPC LTD THERMAL-COAL 42000 273577 38900
UNCHAHAR TPS III NTPC LTD THERMAL-COAL 21000 142780 43000
KOLDAM NTPC LTD HYDRO-HYDRO 80000 363260 43600
NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 303575 25841
RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 108000 668677 35374
NJHPS SJVNL HYDRO-HYDRO 150000 699496 23820
RAMPUR HPS SJVNL HYDRO-HYDRO 41202 195982 32260
TEHRI HPP THDC HYDRO-HYDRO 100000 272543 51800
KOTESHWAR HEP THDC HYDRO-HYDRO 40000 106244 53400
IGSTPS JHAJJAR ARAVALI P CPL THERMAL-COAL 150000 510429 49490
NEYVELI BARSINGSAR NEYVELI LIG CORP LTD THERMAL-LIG 25000 127520 38040
STATE SECTOR
PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 21000 14222 48200
PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 21000 19205 48400
PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 25000 102257 42600
PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 25000 62107 41800
DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 60000 312213 41000
RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 120000 35767442200
WYC HYDEL STATION HPGCL HYDRO-HYDRO 6240 20365 24900
GIRI POWER HOUSE HPSEB HYDRO-HYDRO 6000 13958 7600
ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 1695 5467 11900
BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 12000 18528 6700
GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 2250 7462 22500
BASSI POWER HOUSE HPSEB HYDRO-HYDRO 6600 29649 7500
BINWA POWER HOUSE HPSEB HYDRO-HYDRO 600 2749 19300
ANNEXURE-I
RATE OF SALE OF POWER FOR THE YEAR 2016-2017
Page 33
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) GAJ POWER HOUSE HPSEB HYDRO-HYDRO 1050 2914 26700
BANER POWER HOUSE HPSEB HYDRO-HYDRO 1200 2864 16200
HOLI POWER HOUSE HPSEB HYDRO-HYDRO 300 616 22500
THIROT POWER HOUSE HPSEB HYDRO-HYDRO 450 1126 22500
KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 1200 3064 22500
LARJI POWER HOUSE HPSEB HYDRO-HYDRO 12600 53677 23700
NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 250 750 31000
CHABA POWER HOUSE HPSEB HYDRO-HYDRO 175 465 23300
RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 150 101 13400
SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 200 000 22500
KILLAR HPSEB HYDRO-HYDRO 030 050 22500
BHABA AUGUMENP H HPSEB HYDRO-HYDRO 450 1276 22500
BS CHAMBA HPSEB HYDRO-HYDRO 045 099 19500
GUMMA HPSEB HYDRO-HYDRO 300 423 22500
GAS TURBINE POWER STATION IPGCL THERMAL-GAS 27000 67233 39300
PPS-I PPCL THERMAL-GAS 33000 175905 38300
PPS-III PPCL THERMAL-GAS 137120 196879 36100
LOWER JHELUM JampKPDD HYDRO-HYDRO 10500 60214 5100
UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 2260 10514 6300
UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 10500 44202 8500
GANDHARBAL JampKPDD HYDRO-HYDRO 1500 8925 4700
KARNAH MPH JampKPDD HYDRO-HYDRO 200 1122 31000
CHENANI I JampKPDD HYDRO-HYDRO 2330 10892 6600
CHENANI II JampKPDD HYDRO-HYDRO 200 1188 9300
CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 750 3634 14200
IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 375 2108 18500
IGO MERCHELLONG JampKPDD HYDRO-HYDRO 300 1572 29700
PAHALGAM MHP JampKPDD HYDRO-HYDRO 450 1713 32900
MARPACHOO JampKPDD HYDRO-HYDRO 075 375 29800
HAFTAL JampKPDD HYDRO-HYDRO 100 483 28700
SANJAK JampKPDD HYDRO-HYDRO 126 441 36000
SEWA-III JampKPDD HYDRO-HYDRO 900 3273 20200
BHADERWAH JampKPDD HYDRO-HYDRO 150 935 8900
BAZGO JampKPDD HYDRO-HYDRO 030 108 33300
SUMOOR JampKPDD HYDRO-HYDRO 010 045 35400
HUNDER JampKPDD HYDRO-HYDRO 040 176 26200
STAKNA JampKPDD HYDRO-HYDRO 400 1933 4100
KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 124000 662879 31360
SURATGARH TPS RRVUNL THERMAL-COAL 150000 402328 41730
CHHABRA TPS 1amp 2 RRVUNL THERMAL-COAL 50000 305946 36700
CHHABRA TPS 3 RRVUNL THERMAL-COAL 25000 151536 36700
CHHABRA TPS 4 RRVUNL THERMAL-COAL 25000 155896 36700
RAMGARH GT POWER PROJECT RRVUNL THERMAL-COAL 22050 43177 41800
RAMGARH GAS T P PROJECT 3 RRVUNL THERMAL-GAS 5000 93615 41800
DHOLPUR C C POWER PROJECT RRVUNL THERMAL-R-LNG 33000 9486 46110
MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 14000 20855 34192
MINI MICRO HYDEL (MMH) P S RRVUNL HYDRO-HYDRO 2385 851 37800
KALISINDH TPP 1 RRVUNL THERMAL-COAL 60000 341543 45000
KALISINDH TPP 2 RRVUNL THERMAL-COAL 60000 211588 45000
KHARA HEP UPJVNL HYDRO-HYDRO 7200 26654 7200
MATATILLA HEP UPJVNL HYDRO-HYDRO 3060 12219 6500
OBRA HEP UPJVNL HYDRO-HYDRO 9900 21517 6300
RIHAND UPJVNL HYDRO-HYDRO 30000 57369 5500
ANPARA A TPS UPRVUNL THERMAL-COAL 63000 317536 27000
ANPARA B TPS UPRVUNL THERMAL-COAL 100000 705605 22700
ANPARA D UPRVUNL THERMAL-COAL 100000 300158 39800
HARDUAGANJ TPS UPRVUNL THERMAL-COAL 16500 45817 49200
HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 50000 304389 46600
OBRA A TPS UPRVUNL THERMAL-COAL 28800 13158 34000
OBRA B TPS UPRVUNL THERMAL-COAL 100000 328124 21900
Page 34
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) PANKI TPS UPRVUNL THERMAL-COAL 21000 66488 50300
PARICHHA TPS UPRVUNL THERMAL-COAL 22000 38762 49400
PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 42000 231931 45600
PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 50000 276722 50400
CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 24000 70845 8290
CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 14400 75366 8390
DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 3375 9595 12080
DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 5100 18701 10520
KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4140 17359 12330
KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 12000 33001 9420
KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 3000 11953 8320
TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 9000 33983 12460
MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 30400 124510 16110
RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 19800 17897 10550
MPUR UTTARAKHAND JVNL HYDRO-HYDRO 930 5121 19200
PATHRI UTTARAKHAND JVNL HYDRO-HYDRO 2040 11636 14200
GALOGI UTTARAKHAND JVNL HYDRO-HYDRO 300 648 12500
PRIVATE SECTOR
MGTPP CLP INDIA PVT LTD THERMAL-COAL 132000 268902 41940
SHRINAGAR HEP ALAKNANDA HPCL HYDRO-HYDRO 33000 127414 48800
GAMA INFRAPROP CCPP GAMA INFRAPROP PVT THERMAL-GAS 22500 52686 47000
PPGCL (BARA) JP POWER VENTURES LTD THERMAL-COAL 198000 448200 38500
MALANA HEP MALANA PCL HYDRO-HYDRO 8600 26354 29792
MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 10000 30369 32580
ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 19200 56347 36079
KASHANG HEP H P PCL HYDRO-HYDRO 19500 5034 29200
BASPA-II HEP HBPCL HYDRO-HYDRO 30000 132769 13600
KARCHAM WANGTOO HEP HBPCL HYDRO-HYDRO 100000 434386 36600
RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 108000 582600 43700
RITHALA COMBI CY POWER PLANT TATA POWER DDL THERMAL-GAS 9480 000 11900
RAJPURA TPS NABHA POWER LTD THERMAL-GAS 140000 901484 39000
TALWANDI SABO POWER LTD TALWANDI SABO POWER LTD THERMAL-COAL 198000 636040 49548
ROJA THERMAL POWER STATION ROJA POWER SCL THERMAL-COAL 120000 727200 43400
KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 34400 63400
BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 36000 62600
MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 38200 60800
UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 37900 61500
KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 42300 58800
LALITPUR PGCL BAJAJ ENERGY PVT LTD THERMAL-COAL 198000 359400 47300
PRAYAGRAJ PGCL PRAYAGRAJ PGCL THERMAL-COAL 132000 448200 38595
KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 132000 783182 33438
WESTERN REGION
CENTRAL SECTOR
INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 100000 325333 23892
OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 52000 141663 34001
GANDHAR CCPP NTPC LTD THERMAL-GAS 65739 221924 28700
KAWAS CCPP NTPC LTD THERMAL-GASN 65620 167929 27000
KORBA I amp II NTPC LTD THERMAL-COAL 210000 1499171 20500
KORBA III NTPC LTD THERMAL-COAL 50000 358746 26600
SIPAT STPS I NTPC LTD THERMAL-COAL 198000 1479902 26800
SIPAT STPS II NTPC LTD THERMAL-COAL 100000 766549 26500
VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 126000 693142 25800
VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 100000 608781 23800
VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 100000 673475 27600
VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 100000 655924 32900
VINDHYACHAL STPS V NTPC LTD THERMAL-COAL 50000 328265 31700
MOUDA I NTPC LTD THERMAL-COAL 100000 343130 44500
MOUDA Ii NTPC LTD THERMAL-COAL 66000 40637 39900
RATNAGIRI GAS amp POWER PVT LTD RGPPL THERMAL-GAS 196708 442485 47000
KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 000 24729
TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 32000 201227 10740
Page 35
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 365122 19069
TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 787444 29324
STATE SECTOR
GSEG-HAZIRA15610 MW GUJARAT S ENEGEN LTD THERMAL-GAS 15610 1805 28200
GSEG-HAZIRA35143 MW GUJARAT S ENEGEN LTD THERMAL-GAS 35130 22276 51300
GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 21978 51800
AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 13929 26100
KORBA TPS EAST CSPGCL THERMAL-COAL 44000 198673 33880
DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 365808 27570
KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 316500 30420
HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 532878 19410
CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 515 58300
MTTPS CHAMPA U-I CSPGCL THERMAL-COAL 50000 220376 39000
MTTPS CHAMPA U-II CSPGCL THERMAL-COAL 50000 23709 10000
SHP GANGREL CSPGCL HYDRO-HYDRO 1000 2350 36790
BANGO HEP CSPGCL HYDRO-HYDRO 12000 14662 8900
MHP KORBA WEST CSPGCL HYDRO-HYDRO 170 859 38190
SIKASAR HEP CSPGCL HYDRO-HYDRO 700 418 26870
DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8843 74500
DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 19446 51500
GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 66388 71600
GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127488 41300
KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 96072 43900
KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 29841 56400
SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 184966 58800
UKAI 1-5 GSECL THERMAL-COAL 85000 204891 46900
UKAI TPS 6 GSECL THERMAL-COAL 50000 284448 48200
WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 271999 58300
WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 82808 44100
KADANA HPS GSECL HYDRO-HYDRO 24200 34433 16800
UKAI HPS GSECL HYDRO-HYDRO 30500 40585 6100
TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 123000 11500
BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 8900 10900
BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 7200 27500
JHINNA HPS MPPGCL HYDRO-HYDRO 2000 9700 18500
RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 44300 3400
GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 17300 4600
SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 4100 16900
MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 14600 27000
PENCH HPS MPPGCL HYDRO-HYDRO 16000 23700 8100
RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 3000 16900
AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 134400 35100
SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 283800 38700
SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 344600 34300
SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 111600 61600
SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 211800 58000
SSTPS PH-I MPPGCL THERMAL-COAL 120000 233100 84300
BHUSAWAL TPS MSPGCL THERMAL-COAL 142000 566258 51100
CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1365682 33700
KHAPERKHEDA MSPGCL THERMAL-COAL 134000 706207 39100
KORADI TPS MSPGCL THERMAL-COAL 62000 443206 42000
NASIK TPS MSPGCL THERMAL-COAL 63000 297275 47000
PARLI TPS MSPGCL THERMAL-COAL 113000 175934 71600
PARAS MSPGCL THERMAL-COAL 50000 267931 38700
URAN CCPP MSPGCL THERMAL-GAS 67200 320330 30600
KOYANA MSPGCL HYDRO-HYDRO 195600 328155 13100
SMALL HYDRO POWER PLANTS MSPGCL HYDRO-HYDRO 45400 93062 30500
BHIRA MSPGCL HYDRO-HYDRO 8000 10046 8400
TILLARI MSPGCL HYDRO-HYDRO 8900 10584 3100
SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 233298 20500
SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 87633 20500
PRIVATE SECTOR
Page 36
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 81282 46750
JNSTPP(JAYPEE NIGRIE) JP POWER VENTURES LTD THERMAL-COAL 132000 726695 29310
MB POWER MB POWER THERMAL-COAL 120000 345632 38310
ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 754922 28671
ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 780761 23495
ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 198000 1263784 32090
ADANI POWER MAHARA ADANI POWER LTD THERMAL-COAL 330000 1666191 34124
AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 170065 36827
SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 252035 45129
ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 458551 36000
ESSAR POWER MP LTD ESSAR POWER MP LTD THERMAL-COAL 60000 243040 28600
VEDANTA LTD (P P -I) VEDANTA LTD THERMAL-GAS 3000 15044 24000
VEDANTA LTD (P P -II) VEDANTA LTD THERMAL-GAS 3000 21293 24000
PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 8234600 24000
165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 5850 64390
145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 68717 40349
SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 132655 28776
SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 144686 38567
MUNDRA UMPPCOASTAL GUJARAT POWER
LTD THERMAL-IMP COAL 400000 2530300
23900
LANCO AMARKANTAK TPP PATHADIH
U-ILANCO AMARKAN POWER LTD THERMAL-COAL 30000 195500
29200
LANCO AMARKANTAK TPP PATHADIH
U-IILANCO AMARKAN POWER LTD THERMAL-COAL 30000 206900
27600
BARADARHA TPS D B POWER LTD THERMAL-COAL 120000 677373 29200
JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 405000 28900
JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 453000 40500
DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 339437 40700
TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 293400 44000
TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 137200 37000
TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 174900 44000
BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 92900 14100
BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23700 34300
KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 27600 48300
CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2530300 23900
BHANDARDRA HEP -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 2475 54900
SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 161400 26500
SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 445000 39000
SOTHERN REGION
CENTRAL SECTOR
NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 325699 54820
NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 305532 39880
NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 998805 38510
NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 113016 54070
NEYVELI TAMILNADU POWER LTD JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 625274 42200
VALLUR TPS NTPC TECL THERMAL-COAL 150000 856438 42350
R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 1493 84300
RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1502919 29400
RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 341291 31800
SIMHADRI I NTPC LTD THERMAL-COAL 100000 688382 36800
SIMHADRI II NTPC LTD THERMAL-COAL 100000 663657 43400
KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 593110 31324
MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 291625 21764
KKNPP-1 amp 2 NPCIL NUCLEAR-NUCLEAR 200000 572609 40948
MINICOY LAKSHADEEP THERMAL-DIESEL 340 770 29600
KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1097 29600
AMINI LAKSHADEEP THERMAL-DIESEL 265 509 29600
ANDROTT LAKSHADEEP THERMAL-DIESEL 219 524 29600
KALPENI LAKSHADEEP THERMAL-DIESEL 175 356 29600
AGATTI LAKSHADEEP THERMAL-DIESEL 195 658 29600
KADMAT LAKSHADEEP THERMAL-DIESEL 190 414 29600
KILTAN LAKSHADEEP THERMAL-DIESEL 150 269 29600
CHETLET LAKSHADEEP THERMAL-DIESEL 100 139 29600
BITRA LAKSHADEEP THERMAL-DIESEL 043 024 29600
BANGARAM LAKSHADEEP THERMAL-DIESEL 018 009 29600
Page 37
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) STATE SECTOR
Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 721811 46500
Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 50000 336142 46500
RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 237358 46500
RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 239926 46500
RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 124500 46500
SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 62109 46500
UPPER SILERU APGENCO HYDRO-HYDRO 24000 33000 46500
LOWER SILERU APGENCO HYDRO-HYDRO 46000 81066 46500
DONKARAI APGENCO HYDRO-HYDRO 2500 6007 46500
PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 1262 46500
CHETTIPETA APGENCO HYDRO-HYDRO 100 214 46500
MUCHKUND APGENCO HYDRO-HYDRO 12000 37571 46500
NAGARJUNASAGAR RCPH APGENCO HYDRO-HYDRO 9000 606 46500
TUNGABHADRA HES amp HAMPI(AP
Share)
APGENCO HYDRO-HYDRO 7200 6100 46500
KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 352232 42600
KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 288131 32500
KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 319272 46500
RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 40073 44300
KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 308317 46000
KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 308963 51300
SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 61004 76600
NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 17960 75300
PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 20873 58300
POCHAMPAD-I TSPGENCO HYDRO-HYDRO 2700 5455 29800
POCHAMPAD-II TSPGENCO HYDRO-HYDRO 900 1932 40700
NIZAMSAGAR TSPGENCO HYDRO-HYDRO 1000 1126 53400
RAICHUR TPS 1 to 7 KPCL THERMAL-COAL 147000 890866 43800
RAICHUR TPS 8 KPCL THERMAL-COAL 25000 159523 48200
BELLARI TPS 1 KPCL THERMAL-COAL 50000 318679 51100
BELLARI TPS 2 KPCL THERMAL-COAL 50000 232347 55600
BELLARI TPS 3 KPCL THERMAL-COAL 70000 47565 34400
BHADRA PH KPCL HYDRO-HYDRO 3920 2369 45900
GERUSUPPA PH KPCL HYDRO-HYDRO 24000 26990 22000
GHAT PRABHA HEP KPCL HYDRO-HYDRO 3200 4777 25300
KADRA HPS KPCL HYDRO-HYDRO 15000 16889 26800
NAGJHARI KPCL HYDRO-HYDRO 90000 155159 9800
KODASALLI DPH KPCL HYDRO-HYDRO 12000 14854 19200
MUNIRA+MGH+SPH+SPH KPCL HYDRO-HYDRO 22640 48211 7900
SHARAVATHY HPS KPCL HYDRO-HYDRO 108550 276215 5400
ALMATTI DPH KPCL HYDRO-HYDRO 29000 39611 24600
VARAHI UGPH KPCL HYDRO-HYDRO 46000 71368 15600
IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 17196 15300
IDUKKI HPS KSEB HYDRO-HYDRO 78000 137905 15300
KAKKAD HPS KSEB HYDRO-HYDRO 5000 13063 15300
KALLADA HPS KSEB HYDRO-HYDRO 1500 4436 15300
KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 46544 15300
KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 635 15300
LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 30822 15300
MALANKARA HPS KSEB HYDRO-HYDRO 1050 2474 15300
MATTUPETTY KSEB HYDRO-HYDRO 200 230 15300
MALAMPUZHA KSEB HYDRO-HYDRO 250 063 15300
CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 864 15300
URUMI ST I amp II KSEB HYDRO-HYDRO 615 903 15300
LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 248 15300
NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7765 19625 15300
PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 16601 15300
PANNIAR HPS KSEB HYDRO-HYDRO 3240 6217 15300
PORINGALKUTHU KSEB HYDRO-HYDRO 3600 10052 15300
PORINGALKUTHU LBE KSEB HYDRO-HYDRO 1600 9438 15300
PEPPARA KSEB HYDRO-HYDRO 300 395 15300
POOZHITHODE KSEB HYDRO-HYDRO 480 1045 15300
Page 38
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) PEECHI KSEB HYDRO-HYDRO 125 040 15300
RANI-PERUNADU KSEB HYDRO-HYDRO 400 585 15300
SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 79783 15300
SENGULAM HPS KSEB HYDRO-HYDRO 5120 11558 15300
SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 16711 15300
VILANGAD KSEB HYDRO-HYDRO 750 1578 15300
BARAPOLE KSEB HYDRO-HYDRO 1500 1932 15300
VELLATHOOVAL KSEB HYDRO-HYDRO 360 305 15300
CHIM0NY KSEB HYDRO-HYDRO 250 156 15300
ADYANPARA KSEB HYDRO-HYDRO 350 501 15300
BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 554 15300
KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 3801 15300
KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 23132 32800
ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 14416 62280
METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 523970 62280
METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 321270 62280
NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 336575 62280
NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 591240 62280
TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 508966 62280
KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 30897 62280
VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 18720 90699 62280
KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 33593 62280
BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 1047 62280
PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 1250 62280
PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 330 62280
MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 4897 62280
MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 032 62280
KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15681 62280
KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 40608 62280
KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 21342 62280
KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 4717 62280
KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4322 62280
KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2399 62280
METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 4416 62280
METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 8035 62280
BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2187 62280
BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2359 62280
BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2511 62280
BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 1949 62280
BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 1819 62280
POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 172 62280
SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 241 62280
MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 026 62280
THIRUMOORTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 136 62280
PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 9309 62280
VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 353 62280
SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 4192 62280
PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 6571 62280
SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 1186 62280
SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6319 62280
ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 6122 62280
KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 28674 62280
SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 18381 62280
SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 4258 62280
KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 12680 62280
KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4201 62280
ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 000 62280
PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 19175 62280
AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 078 62280
BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 504 62280
BHAVANI KATTALAI (BKB)(IIIampIII BB I amp II)TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 5847 62280
PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 000 62280
Page 39
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) SRI DAMODARAM STPS APPDCL THERMAL-COAL 160000 808108 36300
PRIVATE SECTOR
KARUPPUR TANJORE LANCO TANJORE PCL THERMAL-GAS 12000 48096 28770
SIMHAPURI ENERGY LTD SIMHAPURI ENERGY LTD THERMAL-COAL 60000 143900 39100
JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 7111 45500
SBU 1 JSW ENERGY LTD
VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 26000 159100
43300
SBU 2 JSW ENERGY LTD
VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 60000 247900
42800
LANCO KPLLANCO KONDAPALLI POWER
LTDTHERMAL-GAS 36814 85060
25776
LANCO KPL STG -IILANCO KONDAPALLI POWER
LTDTHERMAL-GAS 36600 12979
46330
LANCO KPL STG -IIIALANCO KONDAPALLI POWER
LTDTHERMAL-GAS 37100 85710
46330
LANCO KPL STG -III BLANCO KONDAPALLI POWER
LTDTHERMAL-GAS 37100 43639
46330
HINDUJA NATIONAL PCL HINDUJA NATIONAL PCL THERMAL-COAL 104000 303000 38200
MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 121164 49940
UDUPI POWER COR LTD ADANI POWER LTD THERMAL-COAL 120000 754613 42500
SPECTRUM POWER GENERATION
LTD SPECTRUM PG LTD THERMAL-GASN 20525 9256812
34952
TAQA NEYVELI POWER COM PVT
LTD TAQA NEYVELI THERMAL-LIG 25000 5840
34500
ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 251000 51000
ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 207860 36800
GMR VEMAGIRI POWER GENERATION
LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 30117
46450
EASTERN REGION
CENTRAL SECTOR
MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 64675 53113
MTPS STAGE - II KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 39000 1432 69138
BOKARO `B` TPS DVC THERMAL-COAL 63000 145670 31539
MEJIA TPS U 1-3 DVC THERMAL-COAL 63000 348298 31552
MEJIA TPS U 4 DVC THERMAL-COAL 21000 116099 34997
MEJIA TPS U 5-6 DVC THERMAL-COAL 50000 276427 35976
MEJIA TPS U 7-8 DVC THERMAL-COAL 100000 552854 36991
DURGAPUR STEEL TPS DVC THERMAL-COAL 100000 665550 39323
DURGAPUR TPS DVC THERMAL-COAL 21000 59270 35416
RAGHUNATHPUR TPS DVC THERMAL-COAL 120000 201650 35326
MAITHON HYDEL STA DVC HYDRO-HYDRO 6320 12200 17984
CHANDRAPURA TPSU1-3 DVC THERMAL-COAL 42000 257610 35095
CHANDRAPURA TPSU7-8 DVC THERMAL-COAL 50000 306673 34987
KODERMA TPS DVC THERMAL-COAL 100000 380180 38131
PANCHET HPS DVC HYDRO-HYDRO 8000 13360 17984
TILLAYA HPS DVC HYDRO-HYDRO 400 1410 17984
RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34700 35400
TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 277300 23200
TLDP -III NHPC LTD HYDRO-HYDRO 13200 55400 62000
TLDP -IV NHPC LTD HYDRO-HYDRO 16000 60300 25600
FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 957219 33700
FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 308943 41000
BONGAINGAON TPS NTPC LTD THERMAL-COAL 25000 153663 58600
KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 542277 34200
KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 942591 34200
BARH-II NTPC LTD THERMAL-COAL 132000 728021 44500
TALCHER TPS NTPC LTD THERMAL-COAL 46000 335521 30100
TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 702319 25600
TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1436521 24700
STATE SECTOR
BTPS(RampM) BIHAR STATE PGCL THERMAL-COAL 22000 12142 39700
BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 98331 10602
HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 50593 9482
CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 19689 2605
RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 53192 6033
UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 147208 14637
Page 40
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 60353 4519
IB TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 288567 25000
J P H GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 210 038 61100
MEYONG CHU GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 400 1086 61100
TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 122667 38200
DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 214339 43321
KOLAGHAT THERMAL POWER
STATION
WEST BENGAL PDCL THERMAL-COAL 126000 538269 31603
BAKRESHWAR THERMAL POWER
PLANT
WEST BENGAL PDCL THERMAL-COAL 105000 634876 32154
BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 45000 166855 33299
SANTHALDIH THERMAL POWER
STATION
WEST BENGAL PDCL THERMAL-COAL 50000 336442 34932
SAGARDIGHI THERMAL POWER
PROJECT
WEST BENGAL PDCL THERMAL-COAL 160000 423121 34705
JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 20344 68900
RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 24559 68900
TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 4623 68900
PURULIA PUMPED STORAGE
PROJECT
WEST BENGAL SEDCL HYDRO-HYDRO 90000 108816 68900
MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2768 68900
PRIVATE SECTOR
CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 49474 20230
CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 555500 70200
HALDIA ENERGY HALDIA ENERGY LTD THERMAL-COAL 60000 371000 50400
DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3688 63400
KAMALANGA TPS GMR KAMALANGA ENERGY LTD THERMAL-COAL 105000547670
33300
ADHUNIK POWER U-1 ADHUNIK POWER THERMAL-COAL 27000 158 44060
ADHUNIK POWER U-2 ADHUNIK POWER THERMAL-COAL 27000 168 44250
VL-JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 332800 23622
JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 43000 45250
JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 71700 37030
JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 70700 35920
JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 71100 38870
JOJOBERA UNIT 5 TATA POWER COM LTD THERMAL-COAL 12000 79300 44560
JOJOBERA UNIT 6 TATA POWER COM LTD THERMAL-WHR 12000 83700 12840
IEL KALINGANAGAR U-I TATA POWER COM LTD THERMAL-WG 6750 33400 22500
IEL KALINGANAGAR U-II TATA POWER COM LTD THERMAL-WG 6750 34800 22500
MAITHON UNIT 1 amp 2 TATA POWER COM LTD THERMAL-COAL 105000 678000 36100
HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 27500 24340
HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 28400 24340
HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 15800 24310
NORTH EASTERN REGION
CENTRAL SECTOR
LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 74100 36600
AGARTALA GT NEEPCO THERMAL-GAS 13500 88611 27210
ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 153111 32310
DOYANG HEP NEEPCO HYDRO-HYDRO 7500 25598 49801
KOPILI HEP NEEPCO HYDRO-HYDRO 20000 98186 11491
KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 19582 20237
KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 10310 17968
RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 124093 22945
TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 10100 17344 39000
STATE SECTOR
HYDRO POWER (122 Stns) ITANAGAR GOVT OF ARUNACHAL
PRADESHHYDRO-HYDRO 6971 6217270
24600
KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39514 17337
LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 82327 36810
NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 33318 48290
MYNTRIANG SHEP ST II ASSAM POWER GENCO HYDRO-HYDRO 300 567 35776
LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 9130 49200
LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 012 49200
DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 022 49200
TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 000 49200
UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 4990 16000
UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 6476 37000
UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 16494 14600
UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 3600 9556 15000
SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 758 8000
MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44070 44800
KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 154 41400
TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 091 41400
MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 411 41400
MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 394 41400
KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 760 41400
SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 3264 41400
LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 044 41400
BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 18953 28000
ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 43585 28200
GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 4080 11100
Note
LIG Lignite N Naptha WHR Waste Heat Recovery
Page 41
अपरल2019 April 2019 अपरल2019 -अपरल2019 April2019 to April2019
उततरी कषतर Northern Region
चडीगढ़ Chandigarh Data not received Data not received
दिलली Delhi Data not received Data not received
हरियजणज Haryana 0811 hrsday 0811 hrsday
दहमजचल परिश Himachal Pradesh HPSEBL has only 2 agriculture consumers and uninterrupted
power is being supplied to agriculture sector
HPSEBL has only 2 agriculture consumers and uninterrupted
power is being supplied to agriculture sector
रमम कशमीि Jammu amp Kashmir Data not received Data not received
परजब Punjab 379 hrsday 379 hrsday
िजरसथजन Rajasthan 0630 hrsday 0630 hrsday
उतति परिश Uttar Pradesh 2157 hrsday 2157 hrsday
उततिजखड Uttarakhand 2359 hrsday 2359 hrsday
पशचिमी कषतर Western Region
छततीसगढ़ Chhattisgarh 18 hrsday 18 hrsday
गरिजत Gujarat 8 hrsday 8 hrsday
मधय परिश Madhya Pradesh Three-Phase Supply(Irrigation)- 0953 hrs day Three-Phase
(Mixed) Supply - 2334 hrs day
Three-Phase Supply(Irrigation)- 0953 hrs day Three-Phase
(Mixed) Supply - 2334 hrs day
महजिजषटर Maharashtra Three-Phase Supply(Irrigation)- 9 hrs day Three-Phase Supply(Irrigation)- 9 hrs day
गोवज Goa No restriction No restriction
दकषकषणी कषतर Southern Region
आनधर परिश Andhra Pradesh 07 hrsday 07 hrsday
तलगजनज Telangana 24 hrsday 24 hrsday
कनजाटक Karnataka 6 hrsday 6 hrsday
किल Kerala No Restrictions No Restrictions
तममल नजड Tamil Nadu 9 hrsday (6 hrs during day time and 3 hrs during night time) 9 hrsday (6 hrs during day time and 3 hrs during night time)
पडचिी Puducherry No Restrictions No Restrictions
परवी कषतर Eastern Region
बबहजि Bihar 18 hrsday 18 hrsday
झजिखणड Jharkhand 20 hrsday 20 hrsday
ओडडशज Odisha 24 hrsday 24 hrsday
पशशचम बगजल West Bengal 23 hrsday 23 hrsday
28
मारच 2019 कषि कषतर को षिदयत आपरतच का षििरण Power Supply to Agricultural Sector during March2019
राजय कषतर State Regionऔसत वरवदयत आपरत ण घनरो म Average Hours of Supply
On segregated feeders
SNo Contents Page
1 Growth of Installed Capacity since 6th Plan 29
2 Progress of Transmission Sector since 6th Plan 30
3 All India Yearly Coal consumption for Power Generation (Utilities)
4 All India Annual Per Capita Consumption of Electricity since -2006
5 Average cost of power supply amp Average realisation (Paisakwh)
6 Growth of Rural Electrification amp Pump Sets Energisation
7 Status of Hydro Schemes Cleared by the CEA in Apr-2019
Section G - Growth of Power Sector
31
32
(In MW)
Coal Gas Diesel Total
End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472
End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634
End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537
End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596
End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921
End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703
End of 12th Plan 19216288 2532938 83763 21832988 6780 4447842 50018 31960630
Up to Apr-2019 20070450 2493722 63763 22627934 678000 4539922 7764163 35610019
Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-17) = 51529 MW
Electricity Generation (MU) Targets and Achievements for 2016-17
Coal Gas Diesel Nuclear Hydro Res Total
2007045 2493722 637629 678000 453992 77641625 22925174
29
1 Growth of Installed Capacity Since 6th Plan
Plan YearThermal
Nuclear Hydro RES (MNRE) Total
2007045
2493722637629
678000
4539922
77641625
Total Installed Capacity 35610019 MW
Coal Gas Diesel Nuclear Hydro Res
Progress of Transmission Sector in the Country up to April 2019
1 TRANSMISSION LINES (All fig in CKM)
At the end of
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
6th plan 0 0 0 0 0 0 0 0 0 0 0 0 1831 4198 0 6029 1641 44364 0 46005 3472 48562 0 52034
7th plan 0 0 0 0 0 0 0 0 0 0 0 0 13068 6756 0 19824 4560 55071 0 59631 17628 61827 0 79455
8th plan 0 0 0 0 1634 0 0 1634 0 0 0 0 23001 13141 0 36142 6564 73036 0 79600 31199 86177 0 117376
9th plan 0 0 0 0 3234 1504 0 4738 751 409 0 1160 29345 20033 0 49378 8687 88306 0 96993 42017 110252 0 152269
10th plan 0 0 0 0 4368 1504 0 5872 1775 409 0 2184 48708 24730 0 73438 9444 105185 0 114629 64295 131828 0 196123
11th Plan 0 0 0 0 5948 1504 1980 9432 4839 411 0 5250 71023 30191 5605 106819 10140 125010 830 135980 91950 157116 8415 257481
12th Plan 6124 0 0 6124 5948 1504 1980 9432 25465 1177 4598 31240 92482 48240 17065 157787 11014 151276 978 163268 141033 202197 24621 367851
13th Plan (Up
to Mar2019)6124 0 0 6124 5948 1504 1980 9432 33692 1512 6605 41809 101335 58238 21173 180746 11734 162552 1010 175296 158833 223806 30768 413407
13th Plan (Up
to Apr-19)6124 0 0 6124 5948 1504 1980 9432 33745 1512 6605 41862 101335 58258 21173 180766 11734 162953 1010 175697 158886 224227 30768 413881
27150 600 MW of 132 kV Inter-Regional power transmission capacity links which are operated radially from time to time is not added in the total
75050
47900
24000
99050
30
Grand Total
Note - The figure upto the end of 10th plan in for stringing progress including the lines not commissioned Now only commissioned lines are reckoned Accordingly the figure for 10th plan (end) may read
as 187555 after adjusting with (-) 10852 Ckm
Inter-regional Power Transfer Capacity (MW)
plusmn 800 kV HVDC plusmn 500 kV HVDC 765 kV 400 kV 220 kV
IR addition in 12th
Plan (up to March
2017)
Inter-regional
Transmission
Capacity at the end
of Plan Period 2017-
22 (as on April19)
IR at the end of 11th
PlanIR at the end of 12th
Plan
IR Capacity Addition
at the end of Plan
Period 2017-22 (Till
April 19)
2004-05 27800
2005-06 28100
2006-07 30200
2007-08 33000
2008-09 35500
2009-10 36700
2010-11 38700
2011-12 41756
2012-13 45460
2013-14 48940
2014-15 53040
2015-16 54590
2016-17 57430
2017-18 60800
2018-19 62890
Year
2005-06
2006-07
2007-08
2008-09
2009-10
2010-11
2011-12
2012-13
2013-14
2014-15
2015-16
2016-17
2017-18
2018-19
2004-05 254 209 7568
2005-06 260 221 7636
2006-07 276 227 7423
2007-08 293 239 7727
2008-09 340 263 8713
2009-10 355 268 8870
2010-11 398 303 11975
2011-12 455 330 13514
2012-13 501 376 14867
2013-14 518 175
2014-15 520
Source- PFC Reports on the performance of State Power Utilities 31
1181
7335
7786
91441
8188
88363
957
1010
1075
1122
1149
(GrossGen+ Net Import) Mid-year population Provisional
5 Average cost of power supply amp average realization ( paiseKWH )
Yearcost of supply
(paiseunit)
Realization(paiseunit)
Including AgricultureOnly
Agriculture
6719
7171
3 All India yearly Coal Consumption for Power Generation (Utilities)
YEARCoal Consumption
Million Tonnes
4 All India Annual per Capita consumption of Electricity Since 2006
Per Capita Consumption ( kWh)
6314
Sl
NoExecuting Agency
Installed
Capacity (MW)Cost (Rs crore)
Date of
Clearance
32
Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as
Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received
from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made
available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified
villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is
independent of the earlier published reports
No Hydro Electric Project has been issued concurrenceAppraisal letter by CEA during April 2019
7 Status of Hydro Schemes Cleared by the CEA in Apr-2019
Name of Scheme
1999-002000-01
297594
010408 to 310309010409 to 310310
10th Plan
2005-062006-07
322968331020
6 Growth Of Rural Electrification amp Pumpsets Energisation
Plan Year
9th Plan2002-03
134092626
4111
Pump Sets Energised Villages Electricfied (Nos)
2001-02
284064367244
1218
27801997-981998-99
3207
482864
12632
1576036
4451722594
15455554
2314176
397343611750
2093311060316074
65109527813884
46708
18423975
499150
2003-042004-05
5743
9769
Cumu upto End of 10th Plan
010407 to 310308
010410 to 310311557976840909
010411 to 310312
412667
86293726
No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification
since 2004-05
65291374575 296361511th Plan
Cumu upto End of 11th Plan
596556 21212860
557439Cummulative up to end of 12th Plan
SN Contents Page
1 Rate of sale of power for the year 2016-17 33-41
RATE OF SALE OF POWER FOR THE YEAR 2016-17
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) NORTHERN REGION
CENTRAL SECTOR
BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 18000 66900 19800
CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 54000 222400 21600
CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 30000 144400 19600
CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 23100 91700 42600
PARBATI - III HPS NHPC LTD HYDRO-HYDRO 52000 68200 54800
DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 28000 95600 30000
CHUTAK NHPC LTD HYDRO-HYDRO 4400 22000 79800
DULHASTI HPS NHPC LTD HYDRO-HYDRO 39000 228000 56400
SALAL HPS NHPC LTD HYDRO-HYDRO 69000 342300 11000
TANAKPUR HPS NHPC LTD HYDRO-HYDRO 9420 43000 29600
URI HPS -I NHPC LTD HYDRO-HYDRO 48000 280300 16000
URI HPS - II NHPC LTD HYDRO-HYDRO 24000 147300 48600
NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 4500 24600 88200
SEWA - II NHPC LTD HYDRO-HYDRO 12000 47100 43400
ANTA CCPP NTPC LTD THERMAL-GASN 41930 67539 32400
AURAIYA CCPP NTPC LTD THERMAL-GASN 66336 53501 39100
BADARPUR TPS NTPC LTD THERMAL-COAL 70500 159153 44800
DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 84000 296170 42300
DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 98000 526686 46300
DADRI CCPP NTPC LTD THERMAL-GASHSD 82978 227469 33000
FARIDABAD CCPP NTPC LTD THERMAL-GASN 43159 115577 30800
RIHAND STPS I NTPC LTD THERMAL-COAL 100000 596766 24500
RIHAND STPS II NTPC LTD THERMAL-COAL 100000 737069 24600
RIHAND STPS III NTPC LTD THERMAL-COAL 100000 706546 30600
SINGRAULI STPS NTPC LTD THERMAL-COAL 200000 1394068 20400
TANDA TPS NTPC LTD THERMAL-COAL 44000 295438 40800
UNCHAHAR TPS I NTPC LTD THERMAL-COAL 42000 256454 39800
UNCHAHAR TPS II NTPC LTD THERMAL-COAL 42000 273577 38900
UNCHAHAR TPS III NTPC LTD THERMAL-COAL 21000 142780 43000
KOLDAM NTPC LTD HYDRO-HYDRO 80000 363260 43600
NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 303575 25841
RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 108000 668677 35374
NJHPS SJVNL HYDRO-HYDRO 150000 699496 23820
RAMPUR HPS SJVNL HYDRO-HYDRO 41202 195982 32260
TEHRI HPP THDC HYDRO-HYDRO 100000 272543 51800
KOTESHWAR HEP THDC HYDRO-HYDRO 40000 106244 53400
IGSTPS JHAJJAR ARAVALI P CPL THERMAL-COAL 150000 510429 49490
NEYVELI BARSINGSAR NEYVELI LIG CORP LTD THERMAL-LIG 25000 127520 38040
STATE SECTOR
PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 21000 14222 48200
PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 21000 19205 48400
PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 25000 102257 42600
PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 25000 62107 41800
DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 60000 312213 41000
RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 120000 35767442200
WYC HYDEL STATION HPGCL HYDRO-HYDRO 6240 20365 24900
GIRI POWER HOUSE HPSEB HYDRO-HYDRO 6000 13958 7600
ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 1695 5467 11900
BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 12000 18528 6700
GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 2250 7462 22500
BASSI POWER HOUSE HPSEB HYDRO-HYDRO 6600 29649 7500
BINWA POWER HOUSE HPSEB HYDRO-HYDRO 600 2749 19300
ANNEXURE-I
RATE OF SALE OF POWER FOR THE YEAR 2016-2017
Page 33
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) GAJ POWER HOUSE HPSEB HYDRO-HYDRO 1050 2914 26700
BANER POWER HOUSE HPSEB HYDRO-HYDRO 1200 2864 16200
HOLI POWER HOUSE HPSEB HYDRO-HYDRO 300 616 22500
THIROT POWER HOUSE HPSEB HYDRO-HYDRO 450 1126 22500
KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 1200 3064 22500
LARJI POWER HOUSE HPSEB HYDRO-HYDRO 12600 53677 23700
NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 250 750 31000
CHABA POWER HOUSE HPSEB HYDRO-HYDRO 175 465 23300
RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 150 101 13400
SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 200 000 22500
KILLAR HPSEB HYDRO-HYDRO 030 050 22500
BHABA AUGUMENP H HPSEB HYDRO-HYDRO 450 1276 22500
BS CHAMBA HPSEB HYDRO-HYDRO 045 099 19500
GUMMA HPSEB HYDRO-HYDRO 300 423 22500
GAS TURBINE POWER STATION IPGCL THERMAL-GAS 27000 67233 39300
PPS-I PPCL THERMAL-GAS 33000 175905 38300
PPS-III PPCL THERMAL-GAS 137120 196879 36100
LOWER JHELUM JampKPDD HYDRO-HYDRO 10500 60214 5100
UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 2260 10514 6300
UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 10500 44202 8500
GANDHARBAL JampKPDD HYDRO-HYDRO 1500 8925 4700
KARNAH MPH JampKPDD HYDRO-HYDRO 200 1122 31000
CHENANI I JampKPDD HYDRO-HYDRO 2330 10892 6600
CHENANI II JampKPDD HYDRO-HYDRO 200 1188 9300
CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 750 3634 14200
IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 375 2108 18500
IGO MERCHELLONG JampKPDD HYDRO-HYDRO 300 1572 29700
PAHALGAM MHP JampKPDD HYDRO-HYDRO 450 1713 32900
MARPACHOO JampKPDD HYDRO-HYDRO 075 375 29800
HAFTAL JampKPDD HYDRO-HYDRO 100 483 28700
SANJAK JampKPDD HYDRO-HYDRO 126 441 36000
SEWA-III JampKPDD HYDRO-HYDRO 900 3273 20200
BHADERWAH JampKPDD HYDRO-HYDRO 150 935 8900
BAZGO JampKPDD HYDRO-HYDRO 030 108 33300
SUMOOR JampKPDD HYDRO-HYDRO 010 045 35400
HUNDER JampKPDD HYDRO-HYDRO 040 176 26200
STAKNA JampKPDD HYDRO-HYDRO 400 1933 4100
KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 124000 662879 31360
SURATGARH TPS RRVUNL THERMAL-COAL 150000 402328 41730
CHHABRA TPS 1amp 2 RRVUNL THERMAL-COAL 50000 305946 36700
CHHABRA TPS 3 RRVUNL THERMAL-COAL 25000 151536 36700
CHHABRA TPS 4 RRVUNL THERMAL-COAL 25000 155896 36700
RAMGARH GT POWER PROJECT RRVUNL THERMAL-COAL 22050 43177 41800
RAMGARH GAS T P PROJECT 3 RRVUNL THERMAL-GAS 5000 93615 41800
DHOLPUR C C POWER PROJECT RRVUNL THERMAL-R-LNG 33000 9486 46110
MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 14000 20855 34192
MINI MICRO HYDEL (MMH) P S RRVUNL HYDRO-HYDRO 2385 851 37800
KALISINDH TPP 1 RRVUNL THERMAL-COAL 60000 341543 45000
KALISINDH TPP 2 RRVUNL THERMAL-COAL 60000 211588 45000
KHARA HEP UPJVNL HYDRO-HYDRO 7200 26654 7200
MATATILLA HEP UPJVNL HYDRO-HYDRO 3060 12219 6500
OBRA HEP UPJVNL HYDRO-HYDRO 9900 21517 6300
RIHAND UPJVNL HYDRO-HYDRO 30000 57369 5500
ANPARA A TPS UPRVUNL THERMAL-COAL 63000 317536 27000
ANPARA B TPS UPRVUNL THERMAL-COAL 100000 705605 22700
ANPARA D UPRVUNL THERMAL-COAL 100000 300158 39800
HARDUAGANJ TPS UPRVUNL THERMAL-COAL 16500 45817 49200
HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 50000 304389 46600
OBRA A TPS UPRVUNL THERMAL-COAL 28800 13158 34000
OBRA B TPS UPRVUNL THERMAL-COAL 100000 328124 21900
Page 34
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) PANKI TPS UPRVUNL THERMAL-COAL 21000 66488 50300
PARICHHA TPS UPRVUNL THERMAL-COAL 22000 38762 49400
PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 42000 231931 45600
PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 50000 276722 50400
CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 24000 70845 8290
CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 14400 75366 8390
DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 3375 9595 12080
DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 5100 18701 10520
KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4140 17359 12330
KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 12000 33001 9420
KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 3000 11953 8320
TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 9000 33983 12460
MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 30400 124510 16110
RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 19800 17897 10550
MPUR UTTARAKHAND JVNL HYDRO-HYDRO 930 5121 19200
PATHRI UTTARAKHAND JVNL HYDRO-HYDRO 2040 11636 14200
GALOGI UTTARAKHAND JVNL HYDRO-HYDRO 300 648 12500
PRIVATE SECTOR
MGTPP CLP INDIA PVT LTD THERMAL-COAL 132000 268902 41940
SHRINAGAR HEP ALAKNANDA HPCL HYDRO-HYDRO 33000 127414 48800
GAMA INFRAPROP CCPP GAMA INFRAPROP PVT THERMAL-GAS 22500 52686 47000
PPGCL (BARA) JP POWER VENTURES LTD THERMAL-COAL 198000 448200 38500
MALANA HEP MALANA PCL HYDRO-HYDRO 8600 26354 29792
MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 10000 30369 32580
ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 19200 56347 36079
KASHANG HEP H P PCL HYDRO-HYDRO 19500 5034 29200
BASPA-II HEP HBPCL HYDRO-HYDRO 30000 132769 13600
KARCHAM WANGTOO HEP HBPCL HYDRO-HYDRO 100000 434386 36600
RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 108000 582600 43700
RITHALA COMBI CY POWER PLANT TATA POWER DDL THERMAL-GAS 9480 000 11900
RAJPURA TPS NABHA POWER LTD THERMAL-GAS 140000 901484 39000
TALWANDI SABO POWER LTD TALWANDI SABO POWER LTD THERMAL-COAL 198000 636040 49548
ROJA THERMAL POWER STATION ROJA POWER SCL THERMAL-COAL 120000 727200 43400
KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 34400 63400
BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 36000 62600
MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 38200 60800
UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 37900 61500
KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 42300 58800
LALITPUR PGCL BAJAJ ENERGY PVT LTD THERMAL-COAL 198000 359400 47300
PRAYAGRAJ PGCL PRAYAGRAJ PGCL THERMAL-COAL 132000 448200 38595
KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 132000 783182 33438
WESTERN REGION
CENTRAL SECTOR
INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 100000 325333 23892
OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 52000 141663 34001
GANDHAR CCPP NTPC LTD THERMAL-GAS 65739 221924 28700
KAWAS CCPP NTPC LTD THERMAL-GASN 65620 167929 27000
KORBA I amp II NTPC LTD THERMAL-COAL 210000 1499171 20500
KORBA III NTPC LTD THERMAL-COAL 50000 358746 26600
SIPAT STPS I NTPC LTD THERMAL-COAL 198000 1479902 26800
SIPAT STPS II NTPC LTD THERMAL-COAL 100000 766549 26500
VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 126000 693142 25800
VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 100000 608781 23800
VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 100000 673475 27600
VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 100000 655924 32900
VINDHYACHAL STPS V NTPC LTD THERMAL-COAL 50000 328265 31700
MOUDA I NTPC LTD THERMAL-COAL 100000 343130 44500
MOUDA Ii NTPC LTD THERMAL-COAL 66000 40637 39900
RATNAGIRI GAS amp POWER PVT LTD RGPPL THERMAL-GAS 196708 442485 47000
KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 000 24729
TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 32000 201227 10740
Page 35
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 365122 19069
TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 787444 29324
STATE SECTOR
GSEG-HAZIRA15610 MW GUJARAT S ENEGEN LTD THERMAL-GAS 15610 1805 28200
GSEG-HAZIRA35143 MW GUJARAT S ENEGEN LTD THERMAL-GAS 35130 22276 51300
GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 21978 51800
AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 13929 26100
KORBA TPS EAST CSPGCL THERMAL-COAL 44000 198673 33880
DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 365808 27570
KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 316500 30420
HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 532878 19410
CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 515 58300
MTTPS CHAMPA U-I CSPGCL THERMAL-COAL 50000 220376 39000
MTTPS CHAMPA U-II CSPGCL THERMAL-COAL 50000 23709 10000
SHP GANGREL CSPGCL HYDRO-HYDRO 1000 2350 36790
BANGO HEP CSPGCL HYDRO-HYDRO 12000 14662 8900
MHP KORBA WEST CSPGCL HYDRO-HYDRO 170 859 38190
SIKASAR HEP CSPGCL HYDRO-HYDRO 700 418 26870
DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8843 74500
DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 19446 51500
GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 66388 71600
GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127488 41300
KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 96072 43900
KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 29841 56400
SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 184966 58800
UKAI 1-5 GSECL THERMAL-COAL 85000 204891 46900
UKAI TPS 6 GSECL THERMAL-COAL 50000 284448 48200
WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 271999 58300
WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 82808 44100
KADANA HPS GSECL HYDRO-HYDRO 24200 34433 16800
UKAI HPS GSECL HYDRO-HYDRO 30500 40585 6100
TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 123000 11500
BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 8900 10900
BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 7200 27500
JHINNA HPS MPPGCL HYDRO-HYDRO 2000 9700 18500
RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 44300 3400
GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 17300 4600
SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 4100 16900
MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 14600 27000
PENCH HPS MPPGCL HYDRO-HYDRO 16000 23700 8100
RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 3000 16900
AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 134400 35100
SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 283800 38700
SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 344600 34300
SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 111600 61600
SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 211800 58000
SSTPS PH-I MPPGCL THERMAL-COAL 120000 233100 84300
BHUSAWAL TPS MSPGCL THERMAL-COAL 142000 566258 51100
CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1365682 33700
KHAPERKHEDA MSPGCL THERMAL-COAL 134000 706207 39100
KORADI TPS MSPGCL THERMAL-COAL 62000 443206 42000
NASIK TPS MSPGCL THERMAL-COAL 63000 297275 47000
PARLI TPS MSPGCL THERMAL-COAL 113000 175934 71600
PARAS MSPGCL THERMAL-COAL 50000 267931 38700
URAN CCPP MSPGCL THERMAL-GAS 67200 320330 30600
KOYANA MSPGCL HYDRO-HYDRO 195600 328155 13100
SMALL HYDRO POWER PLANTS MSPGCL HYDRO-HYDRO 45400 93062 30500
BHIRA MSPGCL HYDRO-HYDRO 8000 10046 8400
TILLARI MSPGCL HYDRO-HYDRO 8900 10584 3100
SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 233298 20500
SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 87633 20500
PRIVATE SECTOR
Page 36
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 81282 46750
JNSTPP(JAYPEE NIGRIE) JP POWER VENTURES LTD THERMAL-COAL 132000 726695 29310
MB POWER MB POWER THERMAL-COAL 120000 345632 38310
ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 754922 28671
ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 780761 23495
ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 198000 1263784 32090
ADANI POWER MAHARA ADANI POWER LTD THERMAL-COAL 330000 1666191 34124
AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 170065 36827
SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 252035 45129
ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 458551 36000
ESSAR POWER MP LTD ESSAR POWER MP LTD THERMAL-COAL 60000 243040 28600
VEDANTA LTD (P P -I) VEDANTA LTD THERMAL-GAS 3000 15044 24000
VEDANTA LTD (P P -II) VEDANTA LTD THERMAL-GAS 3000 21293 24000
PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 8234600 24000
165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 5850 64390
145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 68717 40349
SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 132655 28776
SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 144686 38567
MUNDRA UMPPCOASTAL GUJARAT POWER
LTD THERMAL-IMP COAL 400000 2530300
23900
LANCO AMARKANTAK TPP PATHADIH
U-ILANCO AMARKAN POWER LTD THERMAL-COAL 30000 195500
29200
LANCO AMARKANTAK TPP PATHADIH
U-IILANCO AMARKAN POWER LTD THERMAL-COAL 30000 206900
27600
BARADARHA TPS D B POWER LTD THERMAL-COAL 120000 677373 29200
JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 405000 28900
JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 453000 40500
DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 339437 40700
TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 293400 44000
TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 137200 37000
TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 174900 44000
BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 92900 14100
BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23700 34300
KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 27600 48300
CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2530300 23900
BHANDARDRA HEP -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 2475 54900
SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 161400 26500
SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 445000 39000
SOTHERN REGION
CENTRAL SECTOR
NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 325699 54820
NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 305532 39880
NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 998805 38510
NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 113016 54070
NEYVELI TAMILNADU POWER LTD JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 625274 42200
VALLUR TPS NTPC TECL THERMAL-COAL 150000 856438 42350
R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 1493 84300
RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1502919 29400
RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 341291 31800
SIMHADRI I NTPC LTD THERMAL-COAL 100000 688382 36800
SIMHADRI II NTPC LTD THERMAL-COAL 100000 663657 43400
KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 593110 31324
MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 291625 21764
KKNPP-1 amp 2 NPCIL NUCLEAR-NUCLEAR 200000 572609 40948
MINICOY LAKSHADEEP THERMAL-DIESEL 340 770 29600
KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1097 29600
AMINI LAKSHADEEP THERMAL-DIESEL 265 509 29600
ANDROTT LAKSHADEEP THERMAL-DIESEL 219 524 29600
KALPENI LAKSHADEEP THERMAL-DIESEL 175 356 29600
AGATTI LAKSHADEEP THERMAL-DIESEL 195 658 29600
KADMAT LAKSHADEEP THERMAL-DIESEL 190 414 29600
KILTAN LAKSHADEEP THERMAL-DIESEL 150 269 29600
CHETLET LAKSHADEEP THERMAL-DIESEL 100 139 29600
BITRA LAKSHADEEP THERMAL-DIESEL 043 024 29600
BANGARAM LAKSHADEEP THERMAL-DIESEL 018 009 29600
Page 37
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) STATE SECTOR
Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 721811 46500
Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 50000 336142 46500
RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 237358 46500
RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 239926 46500
RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 124500 46500
SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 62109 46500
UPPER SILERU APGENCO HYDRO-HYDRO 24000 33000 46500
LOWER SILERU APGENCO HYDRO-HYDRO 46000 81066 46500
DONKARAI APGENCO HYDRO-HYDRO 2500 6007 46500
PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 1262 46500
CHETTIPETA APGENCO HYDRO-HYDRO 100 214 46500
MUCHKUND APGENCO HYDRO-HYDRO 12000 37571 46500
NAGARJUNASAGAR RCPH APGENCO HYDRO-HYDRO 9000 606 46500
TUNGABHADRA HES amp HAMPI(AP
Share)
APGENCO HYDRO-HYDRO 7200 6100 46500
KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 352232 42600
KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 288131 32500
KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 319272 46500
RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 40073 44300
KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 308317 46000
KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 308963 51300
SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 61004 76600
NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 17960 75300
PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 20873 58300
POCHAMPAD-I TSPGENCO HYDRO-HYDRO 2700 5455 29800
POCHAMPAD-II TSPGENCO HYDRO-HYDRO 900 1932 40700
NIZAMSAGAR TSPGENCO HYDRO-HYDRO 1000 1126 53400
RAICHUR TPS 1 to 7 KPCL THERMAL-COAL 147000 890866 43800
RAICHUR TPS 8 KPCL THERMAL-COAL 25000 159523 48200
BELLARI TPS 1 KPCL THERMAL-COAL 50000 318679 51100
BELLARI TPS 2 KPCL THERMAL-COAL 50000 232347 55600
BELLARI TPS 3 KPCL THERMAL-COAL 70000 47565 34400
BHADRA PH KPCL HYDRO-HYDRO 3920 2369 45900
GERUSUPPA PH KPCL HYDRO-HYDRO 24000 26990 22000
GHAT PRABHA HEP KPCL HYDRO-HYDRO 3200 4777 25300
KADRA HPS KPCL HYDRO-HYDRO 15000 16889 26800
NAGJHARI KPCL HYDRO-HYDRO 90000 155159 9800
KODASALLI DPH KPCL HYDRO-HYDRO 12000 14854 19200
MUNIRA+MGH+SPH+SPH KPCL HYDRO-HYDRO 22640 48211 7900
SHARAVATHY HPS KPCL HYDRO-HYDRO 108550 276215 5400
ALMATTI DPH KPCL HYDRO-HYDRO 29000 39611 24600
VARAHI UGPH KPCL HYDRO-HYDRO 46000 71368 15600
IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 17196 15300
IDUKKI HPS KSEB HYDRO-HYDRO 78000 137905 15300
KAKKAD HPS KSEB HYDRO-HYDRO 5000 13063 15300
KALLADA HPS KSEB HYDRO-HYDRO 1500 4436 15300
KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 46544 15300
KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 635 15300
LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 30822 15300
MALANKARA HPS KSEB HYDRO-HYDRO 1050 2474 15300
MATTUPETTY KSEB HYDRO-HYDRO 200 230 15300
MALAMPUZHA KSEB HYDRO-HYDRO 250 063 15300
CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 864 15300
URUMI ST I amp II KSEB HYDRO-HYDRO 615 903 15300
LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 248 15300
NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7765 19625 15300
PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 16601 15300
PANNIAR HPS KSEB HYDRO-HYDRO 3240 6217 15300
PORINGALKUTHU KSEB HYDRO-HYDRO 3600 10052 15300
PORINGALKUTHU LBE KSEB HYDRO-HYDRO 1600 9438 15300
PEPPARA KSEB HYDRO-HYDRO 300 395 15300
POOZHITHODE KSEB HYDRO-HYDRO 480 1045 15300
Page 38
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) PEECHI KSEB HYDRO-HYDRO 125 040 15300
RANI-PERUNADU KSEB HYDRO-HYDRO 400 585 15300
SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 79783 15300
SENGULAM HPS KSEB HYDRO-HYDRO 5120 11558 15300
SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 16711 15300
VILANGAD KSEB HYDRO-HYDRO 750 1578 15300
BARAPOLE KSEB HYDRO-HYDRO 1500 1932 15300
VELLATHOOVAL KSEB HYDRO-HYDRO 360 305 15300
CHIM0NY KSEB HYDRO-HYDRO 250 156 15300
ADYANPARA KSEB HYDRO-HYDRO 350 501 15300
BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 554 15300
KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 3801 15300
KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 23132 32800
ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 14416 62280
METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 523970 62280
METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 321270 62280
NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 336575 62280
NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 591240 62280
TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 508966 62280
KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 30897 62280
VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 18720 90699 62280
KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 33593 62280
BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 1047 62280
PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 1250 62280
PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 330 62280
MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 4897 62280
MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 032 62280
KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15681 62280
KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 40608 62280
KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 21342 62280
KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 4717 62280
KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4322 62280
KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2399 62280
METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 4416 62280
METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 8035 62280
BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2187 62280
BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2359 62280
BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2511 62280
BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 1949 62280
BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 1819 62280
POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 172 62280
SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 241 62280
MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 026 62280
THIRUMOORTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 136 62280
PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 9309 62280
VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 353 62280
SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 4192 62280
PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 6571 62280
SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 1186 62280
SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6319 62280
ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 6122 62280
KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 28674 62280
SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 18381 62280
SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 4258 62280
KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 12680 62280
KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4201 62280
ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 000 62280
PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 19175 62280
AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 078 62280
BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 504 62280
BHAVANI KATTALAI (BKB)(IIIampIII BB I amp II)TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 5847 62280
PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 000 62280
Page 39
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) SRI DAMODARAM STPS APPDCL THERMAL-COAL 160000 808108 36300
PRIVATE SECTOR
KARUPPUR TANJORE LANCO TANJORE PCL THERMAL-GAS 12000 48096 28770
SIMHAPURI ENERGY LTD SIMHAPURI ENERGY LTD THERMAL-COAL 60000 143900 39100
JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 7111 45500
SBU 1 JSW ENERGY LTD
VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 26000 159100
43300
SBU 2 JSW ENERGY LTD
VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 60000 247900
42800
LANCO KPLLANCO KONDAPALLI POWER
LTDTHERMAL-GAS 36814 85060
25776
LANCO KPL STG -IILANCO KONDAPALLI POWER
LTDTHERMAL-GAS 36600 12979
46330
LANCO KPL STG -IIIALANCO KONDAPALLI POWER
LTDTHERMAL-GAS 37100 85710
46330
LANCO KPL STG -III BLANCO KONDAPALLI POWER
LTDTHERMAL-GAS 37100 43639
46330
HINDUJA NATIONAL PCL HINDUJA NATIONAL PCL THERMAL-COAL 104000 303000 38200
MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 121164 49940
UDUPI POWER COR LTD ADANI POWER LTD THERMAL-COAL 120000 754613 42500
SPECTRUM POWER GENERATION
LTD SPECTRUM PG LTD THERMAL-GASN 20525 9256812
34952
TAQA NEYVELI POWER COM PVT
LTD TAQA NEYVELI THERMAL-LIG 25000 5840
34500
ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 251000 51000
ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 207860 36800
GMR VEMAGIRI POWER GENERATION
LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 30117
46450
EASTERN REGION
CENTRAL SECTOR
MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 64675 53113
MTPS STAGE - II KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 39000 1432 69138
BOKARO `B` TPS DVC THERMAL-COAL 63000 145670 31539
MEJIA TPS U 1-3 DVC THERMAL-COAL 63000 348298 31552
MEJIA TPS U 4 DVC THERMAL-COAL 21000 116099 34997
MEJIA TPS U 5-6 DVC THERMAL-COAL 50000 276427 35976
MEJIA TPS U 7-8 DVC THERMAL-COAL 100000 552854 36991
DURGAPUR STEEL TPS DVC THERMAL-COAL 100000 665550 39323
DURGAPUR TPS DVC THERMAL-COAL 21000 59270 35416
RAGHUNATHPUR TPS DVC THERMAL-COAL 120000 201650 35326
MAITHON HYDEL STA DVC HYDRO-HYDRO 6320 12200 17984
CHANDRAPURA TPSU1-3 DVC THERMAL-COAL 42000 257610 35095
CHANDRAPURA TPSU7-8 DVC THERMAL-COAL 50000 306673 34987
KODERMA TPS DVC THERMAL-COAL 100000 380180 38131
PANCHET HPS DVC HYDRO-HYDRO 8000 13360 17984
TILLAYA HPS DVC HYDRO-HYDRO 400 1410 17984
RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34700 35400
TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 277300 23200
TLDP -III NHPC LTD HYDRO-HYDRO 13200 55400 62000
TLDP -IV NHPC LTD HYDRO-HYDRO 16000 60300 25600
FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 957219 33700
FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 308943 41000
BONGAINGAON TPS NTPC LTD THERMAL-COAL 25000 153663 58600
KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 542277 34200
KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 942591 34200
BARH-II NTPC LTD THERMAL-COAL 132000 728021 44500
TALCHER TPS NTPC LTD THERMAL-COAL 46000 335521 30100
TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 702319 25600
TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1436521 24700
STATE SECTOR
BTPS(RampM) BIHAR STATE PGCL THERMAL-COAL 22000 12142 39700
BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 98331 10602
HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 50593 9482
CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 19689 2605
RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 53192 6033
UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 147208 14637
Page 40
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 60353 4519
IB TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 288567 25000
J P H GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 210 038 61100
MEYONG CHU GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 400 1086 61100
TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 122667 38200
DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 214339 43321
KOLAGHAT THERMAL POWER
STATION
WEST BENGAL PDCL THERMAL-COAL 126000 538269 31603
BAKRESHWAR THERMAL POWER
PLANT
WEST BENGAL PDCL THERMAL-COAL 105000 634876 32154
BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 45000 166855 33299
SANTHALDIH THERMAL POWER
STATION
WEST BENGAL PDCL THERMAL-COAL 50000 336442 34932
SAGARDIGHI THERMAL POWER
PROJECT
WEST BENGAL PDCL THERMAL-COAL 160000 423121 34705
JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 20344 68900
RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 24559 68900
TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 4623 68900
PURULIA PUMPED STORAGE
PROJECT
WEST BENGAL SEDCL HYDRO-HYDRO 90000 108816 68900
MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2768 68900
PRIVATE SECTOR
CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 49474 20230
CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 555500 70200
HALDIA ENERGY HALDIA ENERGY LTD THERMAL-COAL 60000 371000 50400
DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3688 63400
KAMALANGA TPS GMR KAMALANGA ENERGY LTD THERMAL-COAL 105000547670
33300
ADHUNIK POWER U-1 ADHUNIK POWER THERMAL-COAL 27000 158 44060
ADHUNIK POWER U-2 ADHUNIK POWER THERMAL-COAL 27000 168 44250
VL-JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 332800 23622
JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 43000 45250
JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 71700 37030
JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 70700 35920
JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 71100 38870
JOJOBERA UNIT 5 TATA POWER COM LTD THERMAL-COAL 12000 79300 44560
JOJOBERA UNIT 6 TATA POWER COM LTD THERMAL-WHR 12000 83700 12840
IEL KALINGANAGAR U-I TATA POWER COM LTD THERMAL-WG 6750 33400 22500
IEL KALINGANAGAR U-II TATA POWER COM LTD THERMAL-WG 6750 34800 22500
MAITHON UNIT 1 amp 2 TATA POWER COM LTD THERMAL-COAL 105000 678000 36100
HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 27500 24340
HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 28400 24340
HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 15800 24310
NORTH EASTERN REGION
CENTRAL SECTOR
LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 74100 36600
AGARTALA GT NEEPCO THERMAL-GAS 13500 88611 27210
ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 153111 32310
DOYANG HEP NEEPCO HYDRO-HYDRO 7500 25598 49801
KOPILI HEP NEEPCO HYDRO-HYDRO 20000 98186 11491
KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 19582 20237
KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 10310 17968
RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 124093 22945
TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 10100 17344 39000
STATE SECTOR
HYDRO POWER (122 Stns) ITANAGAR GOVT OF ARUNACHAL
PRADESHHYDRO-HYDRO 6971 6217270
24600
KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39514 17337
LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 82327 36810
NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 33318 48290
MYNTRIANG SHEP ST II ASSAM POWER GENCO HYDRO-HYDRO 300 567 35776
LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 9130 49200
LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 012 49200
DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 022 49200
TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 000 49200
UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 4990 16000
UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 6476 37000
UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 16494 14600
UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 3600 9556 15000
SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 758 8000
MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44070 44800
KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 154 41400
TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 091 41400
MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 411 41400
MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 394 41400
KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 760 41400
SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 3264 41400
LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 044 41400
BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 18953 28000
ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 43585 28200
GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 4080 11100
Note
LIG Lignite N Naptha WHR Waste Heat Recovery
Page 41
SNo Contents Page
1 Growth of Installed Capacity since 6th Plan 29
2 Progress of Transmission Sector since 6th Plan 30
3 All India Yearly Coal consumption for Power Generation (Utilities)
4 All India Annual Per Capita Consumption of Electricity since -2006
5 Average cost of power supply amp Average realisation (Paisakwh)
6 Growth of Rural Electrification amp Pump Sets Energisation
7 Status of Hydro Schemes Cleared by the CEA in Apr-2019
Section G - Growth of Power Sector
31
32
(In MW)
Coal Gas Diesel Total
End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472
End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634
End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537
End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596
End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921
End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703
End of 12th Plan 19216288 2532938 83763 21832988 6780 4447842 50018 31960630
Up to Apr-2019 20070450 2493722 63763 22627934 678000 4539922 7764163 35610019
Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-17) = 51529 MW
Electricity Generation (MU) Targets and Achievements for 2016-17
Coal Gas Diesel Nuclear Hydro Res Total
2007045 2493722 637629 678000 453992 77641625 22925174
29
1 Growth of Installed Capacity Since 6th Plan
Plan YearThermal
Nuclear Hydro RES (MNRE) Total
2007045
2493722637629
678000
4539922
77641625
Total Installed Capacity 35610019 MW
Coal Gas Diesel Nuclear Hydro Res
Progress of Transmission Sector in the Country up to April 2019
1 TRANSMISSION LINES (All fig in CKM)
At the end of
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
6th plan 0 0 0 0 0 0 0 0 0 0 0 0 1831 4198 0 6029 1641 44364 0 46005 3472 48562 0 52034
7th plan 0 0 0 0 0 0 0 0 0 0 0 0 13068 6756 0 19824 4560 55071 0 59631 17628 61827 0 79455
8th plan 0 0 0 0 1634 0 0 1634 0 0 0 0 23001 13141 0 36142 6564 73036 0 79600 31199 86177 0 117376
9th plan 0 0 0 0 3234 1504 0 4738 751 409 0 1160 29345 20033 0 49378 8687 88306 0 96993 42017 110252 0 152269
10th plan 0 0 0 0 4368 1504 0 5872 1775 409 0 2184 48708 24730 0 73438 9444 105185 0 114629 64295 131828 0 196123
11th Plan 0 0 0 0 5948 1504 1980 9432 4839 411 0 5250 71023 30191 5605 106819 10140 125010 830 135980 91950 157116 8415 257481
12th Plan 6124 0 0 6124 5948 1504 1980 9432 25465 1177 4598 31240 92482 48240 17065 157787 11014 151276 978 163268 141033 202197 24621 367851
13th Plan (Up
to Mar2019)6124 0 0 6124 5948 1504 1980 9432 33692 1512 6605 41809 101335 58238 21173 180746 11734 162552 1010 175296 158833 223806 30768 413407
13th Plan (Up
to Apr-19)6124 0 0 6124 5948 1504 1980 9432 33745 1512 6605 41862 101335 58258 21173 180766 11734 162953 1010 175697 158886 224227 30768 413881
27150 600 MW of 132 kV Inter-Regional power transmission capacity links which are operated radially from time to time is not added in the total
75050
47900
24000
99050
30
Grand Total
Note - The figure upto the end of 10th plan in for stringing progress including the lines not commissioned Now only commissioned lines are reckoned Accordingly the figure for 10th plan (end) may read
as 187555 after adjusting with (-) 10852 Ckm
Inter-regional Power Transfer Capacity (MW)
plusmn 800 kV HVDC plusmn 500 kV HVDC 765 kV 400 kV 220 kV
IR addition in 12th
Plan (up to March
2017)
Inter-regional
Transmission
Capacity at the end
of Plan Period 2017-
22 (as on April19)
IR at the end of 11th
PlanIR at the end of 12th
Plan
IR Capacity Addition
at the end of Plan
Period 2017-22 (Till
April 19)
2004-05 27800
2005-06 28100
2006-07 30200
2007-08 33000
2008-09 35500
2009-10 36700
2010-11 38700
2011-12 41756
2012-13 45460
2013-14 48940
2014-15 53040
2015-16 54590
2016-17 57430
2017-18 60800
2018-19 62890
Year
2005-06
2006-07
2007-08
2008-09
2009-10
2010-11
2011-12
2012-13
2013-14
2014-15
2015-16
2016-17
2017-18
2018-19
2004-05 254 209 7568
2005-06 260 221 7636
2006-07 276 227 7423
2007-08 293 239 7727
2008-09 340 263 8713
2009-10 355 268 8870
2010-11 398 303 11975
2011-12 455 330 13514
2012-13 501 376 14867
2013-14 518 175
2014-15 520
Source- PFC Reports on the performance of State Power Utilities 31
1181
7335
7786
91441
8188
88363
957
1010
1075
1122
1149
(GrossGen+ Net Import) Mid-year population Provisional
5 Average cost of power supply amp average realization ( paiseKWH )
Yearcost of supply
(paiseunit)
Realization(paiseunit)
Including AgricultureOnly
Agriculture
6719
7171
3 All India yearly Coal Consumption for Power Generation (Utilities)
YEARCoal Consumption
Million Tonnes
4 All India Annual per Capita consumption of Electricity Since 2006
Per Capita Consumption ( kWh)
6314
Sl
NoExecuting Agency
Installed
Capacity (MW)Cost (Rs crore)
Date of
Clearance
32
Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as
Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received
from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made
available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified
villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is
independent of the earlier published reports
No Hydro Electric Project has been issued concurrenceAppraisal letter by CEA during April 2019
7 Status of Hydro Schemes Cleared by the CEA in Apr-2019
Name of Scheme
1999-002000-01
297594
010408 to 310309010409 to 310310
10th Plan
2005-062006-07
322968331020
6 Growth Of Rural Electrification amp Pumpsets Energisation
Plan Year
9th Plan2002-03
134092626
4111
Pump Sets Energised Villages Electricfied (Nos)
2001-02
284064367244
1218
27801997-981998-99
3207
482864
12632
1576036
4451722594
15455554
2314176
397343611750
2093311060316074
65109527813884
46708
18423975
499150
2003-042004-05
5743
9769
Cumu upto End of 10th Plan
010407 to 310308
010410 to 310311557976840909
010411 to 310312
412667
86293726
No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification
since 2004-05
65291374575 296361511th Plan
Cumu upto End of 11th Plan
596556 21212860
557439Cummulative up to end of 12th Plan
SN Contents Page
1 Rate of sale of power for the year 2016-17 33-41
RATE OF SALE OF POWER FOR THE YEAR 2016-17
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) NORTHERN REGION
CENTRAL SECTOR
BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 18000 66900 19800
CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 54000 222400 21600
CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 30000 144400 19600
CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 23100 91700 42600
PARBATI - III HPS NHPC LTD HYDRO-HYDRO 52000 68200 54800
DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 28000 95600 30000
CHUTAK NHPC LTD HYDRO-HYDRO 4400 22000 79800
DULHASTI HPS NHPC LTD HYDRO-HYDRO 39000 228000 56400
SALAL HPS NHPC LTD HYDRO-HYDRO 69000 342300 11000
TANAKPUR HPS NHPC LTD HYDRO-HYDRO 9420 43000 29600
URI HPS -I NHPC LTD HYDRO-HYDRO 48000 280300 16000
URI HPS - II NHPC LTD HYDRO-HYDRO 24000 147300 48600
NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 4500 24600 88200
SEWA - II NHPC LTD HYDRO-HYDRO 12000 47100 43400
ANTA CCPP NTPC LTD THERMAL-GASN 41930 67539 32400
AURAIYA CCPP NTPC LTD THERMAL-GASN 66336 53501 39100
BADARPUR TPS NTPC LTD THERMAL-COAL 70500 159153 44800
DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 84000 296170 42300
DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 98000 526686 46300
DADRI CCPP NTPC LTD THERMAL-GASHSD 82978 227469 33000
FARIDABAD CCPP NTPC LTD THERMAL-GASN 43159 115577 30800
RIHAND STPS I NTPC LTD THERMAL-COAL 100000 596766 24500
RIHAND STPS II NTPC LTD THERMAL-COAL 100000 737069 24600
RIHAND STPS III NTPC LTD THERMAL-COAL 100000 706546 30600
SINGRAULI STPS NTPC LTD THERMAL-COAL 200000 1394068 20400
TANDA TPS NTPC LTD THERMAL-COAL 44000 295438 40800
UNCHAHAR TPS I NTPC LTD THERMAL-COAL 42000 256454 39800
UNCHAHAR TPS II NTPC LTD THERMAL-COAL 42000 273577 38900
UNCHAHAR TPS III NTPC LTD THERMAL-COAL 21000 142780 43000
KOLDAM NTPC LTD HYDRO-HYDRO 80000 363260 43600
NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 303575 25841
RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 108000 668677 35374
NJHPS SJVNL HYDRO-HYDRO 150000 699496 23820
RAMPUR HPS SJVNL HYDRO-HYDRO 41202 195982 32260
TEHRI HPP THDC HYDRO-HYDRO 100000 272543 51800
KOTESHWAR HEP THDC HYDRO-HYDRO 40000 106244 53400
IGSTPS JHAJJAR ARAVALI P CPL THERMAL-COAL 150000 510429 49490
NEYVELI BARSINGSAR NEYVELI LIG CORP LTD THERMAL-LIG 25000 127520 38040
STATE SECTOR
PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 21000 14222 48200
PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 21000 19205 48400
PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 25000 102257 42600
PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 25000 62107 41800
DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 60000 312213 41000
RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 120000 35767442200
WYC HYDEL STATION HPGCL HYDRO-HYDRO 6240 20365 24900
GIRI POWER HOUSE HPSEB HYDRO-HYDRO 6000 13958 7600
ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 1695 5467 11900
BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 12000 18528 6700
GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 2250 7462 22500
BASSI POWER HOUSE HPSEB HYDRO-HYDRO 6600 29649 7500
BINWA POWER HOUSE HPSEB HYDRO-HYDRO 600 2749 19300
ANNEXURE-I
RATE OF SALE OF POWER FOR THE YEAR 2016-2017
Page 33
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) GAJ POWER HOUSE HPSEB HYDRO-HYDRO 1050 2914 26700
BANER POWER HOUSE HPSEB HYDRO-HYDRO 1200 2864 16200
HOLI POWER HOUSE HPSEB HYDRO-HYDRO 300 616 22500
THIROT POWER HOUSE HPSEB HYDRO-HYDRO 450 1126 22500
KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 1200 3064 22500
LARJI POWER HOUSE HPSEB HYDRO-HYDRO 12600 53677 23700
NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 250 750 31000
CHABA POWER HOUSE HPSEB HYDRO-HYDRO 175 465 23300
RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 150 101 13400
SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 200 000 22500
KILLAR HPSEB HYDRO-HYDRO 030 050 22500
BHABA AUGUMENP H HPSEB HYDRO-HYDRO 450 1276 22500
BS CHAMBA HPSEB HYDRO-HYDRO 045 099 19500
GUMMA HPSEB HYDRO-HYDRO 300 423 22500
GAS TURBINE POWER STATION IPGCL THERMAL-GAS 27000 67233 39300
PPS-I PPCL THERMAL-GAS 33000 175905 38300
PPS-III PPCL THERMAL-GAS 137120 196879 36100
LOWER JHELUM JampKPDD HYDRO-HYDRO 10500 60214 5100
UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 2260 10514 6300
UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 10500 44202 8500
GANDHARBAL JampKPDD HYDRO-HYDRO 1500 8925 4700
KARNAH MPH JampKPDD HYDRO-HYDRO 200 1122 31000
CHENANI I JampKPDD HYDRO-HYDRO 2330 10892 6600
CHENANI II JampKPDD HYDRO-HYDRO 200 1188 9300
CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 750 3634 14200
IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 375 2108 18500
IGO MERCHELLONG JampKPDD HYDRO-HYDRO 300 1572 29700
PAHALGAM MHP JampKPDD HYDRO-HYDRO 450 1713 32900
MARPACHOO JampKPDD HYDRO-HYDRO 075 375 29800
HAFTAL JampKPDD HYDRO-HYDRO 100 483 28700
SANJAK JampKPDD HYDRO-HYDRO 126 441 36000
SEWA-III JampKPDD HYDRO-HYDRO 900 3273 20200
BHADERWAH JampKPDD HYDRO-HYDRO 150 935 8900
BAZGO JampKPDD HYDRO-HYDRO 030 108 33300
SUMOOR JampKPDD HYDRO-HYDRO 010 045 35400
HUNDER JampKPDD HYDRO-HYDRO 040 176 26200
STAKNA JampKPDD HYDRO-HYDRO 400 1933 4100
KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 124000 662879 31360
SURATGARH TPS RRVUNL THERMAL-COAL 150000 402328 41730
CHHABRA TPS 1amp 2 RRVUNL THERMAL-COAL 50000 305946 36700
CHHABRA TPS 3 RRVUNL THERMAL-COAL 25000 151536 36700
CHHABRA TPS 4 RRVUNL THERMAL-COAL 25000 155896 36700
RAMGARH GT POWER PROJECT RRVUNL THERMAL-COAL 22050 43177 41800
RAMGARH GAS T P PROJECT 3 RRVUNL THERMAL-GAS 5000 93615 41800
DHOLPUR C C POWER PROJECT RRVUNL THERMAL-R-LNG 33000 9486 46110
MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 14000 20855 34192
MINI MICRO HYDEL (MMH) P S RRVUNL HYDRO-HYDRO 2385 851 37800
KALISINDH TPP 1 RRVUNL THERMAL-COAL 60000 341543 45000
KALISINDH TPP 2 RRVUNL THERMAL-COAL 60000 211588 45000
KHARA HEP UPJVNL HYDRO-HYDRO 7200 26654 7200
MATATILLA HEP UPJVNL HYDRO-HYDRO 3060 12219 6500
OBRA HEP UPJVNL HYDRO-HYDRO 9900 21517 6300
RIHAND UPJVNL HYDRO-HYDRO 30000 57369 5500
ANPARA A TPS UPRVUNL THERMAL-COAL 63000 317536 27000
ANPARA B TPS UPRVUNL THERMAL-COAL 100000 705605 22700
ANPARA D UPRVUNL THERMAL-COAL 100000 300158 39800
HARDUAGANJ TPS UPRVUNL THERMAL-COAL 16500 45817 49200
HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 50000 304389 46600
OBRA A TPS UPRVUNL THERMAL-COAL 28800 13158 34000
OBRA B TPS UPRVUNL THERMAL-COAL 100000 328124 21900
Page 34
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) PANKI TPS UPRVUNL THERMAL-COAL 21000 66488 50300
PARICHHA TPS UPRVUNL THERMAL-COAL 22000 38762 49400
PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 42000 231931 45600
PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 50000 276722 50400
CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 24000 70845 8290
CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 14400 75366 8390
DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 3375 9595 12080
DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 5100 18701 10520
KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4140 17359 12330
KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 12000 33001 9420
KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 3000 11953 8320
TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 9000 33983 12460
MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 30400 124510 16110
RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 19800 17897 10550
MPUR UTTARAKHAND JVNL HYDRO-HYDRO 930 5121 19200
PATHRI UTTARAKHAND JVNL HYDRO-HYDRO 2040 11636 14200
GALOGI UTTARAKHAND JVNL HYDRO-HYDRO 300 648 12500
PRIVATE SECTOR
MGTPP CLP INDIA PVT LTD THERMAL-COAL 132000 268902 41940
SHRINAGAR HEP ALAKNANDA HPCL HYDRO-HYDRO 33000 127414 48800
GAMA INFRAPROP CCPP GAMA INFRAPROP PVT THERMAL-GAS 22500 52686 47000
PPGCL (BARA) JP POWER VENTURES LTD THERMAL-COAL 198000 448200 38500
MALANA HEP MALANA PCL HYDRO-HYDRO 8600 26354 29792
MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 10000 30369 32580
ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 19200 56347 36079
KASHANG HEP H P PCL HYDRO-HYDRO 19500 5034 29200
BASPA-II HEP HBPCL HYDRO-HYDRO 30000 132769 13600
KARCHAM WANGTOO HEP HBPCL HYDRO-HYDRO 100000 434386 36600
RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 108000 582600 43700
RITHALA COMBI CY POWER PLANT TATA POWER DDL THERMAL-GAS 9480 000 11900
RAJPURA TPS NABHA POWER LTD THERMAL-GAS 140000 901484 39000
TALWANDI SABO POWER LTD TALWANDI SABO POWER LTD THERMAL-COAL 198000 636040 49548
ROJA THERMAL POWER STATION ROJA POWER SCL THERMAL-COAL 120000 727200 43400
KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 34400 63400
BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 36000 62600
MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 38200 60800
UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 37900 61500
KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 42300 58800
LALITPUR PGCL BAJAJ ENERGY PVT LTD THERMAL-COAL 198000 359400 47300
PRAYAGRAJ PGCL PRAYAGRAJ PGCL THERMAL-COAL 132000 448200 38595
KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 132000 783182 33438
WESTERN REGION
CENTRAL SECTOR
INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 100000 325333 23892
OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 52000 141663 34001
GANDHAR CCPP NTPC LTD THERMAL-GAS 65739 221924 28700
KAWAS CCPP NTPC LTD THERMAL-GASN 65620 167929 27000
KORBA I amp II NTPC LTD THERMAL-COAL 210000 1499171 20500
KORBA III NTPC LTD THERMAL-COAL 50000 358746 26600
SIPAT STPS I NTPC LTD THERMAL-COAL 198000 1479902 26800
SIPAT STPS II NTPC LTD THERMAL-COAL 100000 766549 26500
VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 126000 693142 25800
VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 100000 608781 23800
VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 100000 673475 27600
VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 100000 655924 32900
VINDHYACHAL STPS V NTPC LTD THERMAL-COAL 50000 328265 31700
MOUDA I NTPC LTD THERMAL-COAL 100000 343130 44500
MOUDA Ii NTPC LTD THERMAL-COAL 66000 40637 39900
RATNAGIRI GAS amp POWER PVT LTD RGPPL THERMAL-GAS 196708 442485 47000
KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 000 24729
TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 32000 201227 10740
Page 35
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 365122 19069
TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 787444 29324
STATE SECTOR
GSEG-HAZIRA15610 MW GUJARAT S ENEGEN LTD THERMAL-GAS 15610 1805 28200
GSEG-HAZIRA35143 MW GUJARAT S ENEGEN LTD THERMAL-GAS 35130 22276 51300
GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 21978 51800
AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 13929 26100
KORBA TPS EAST CSPGCL THERMAL-COAL 44000 198673 33880
DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 365808 27570
KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 316500 30420
HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 532878 19410
CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 515 58300
MTTPS CHAMPA U-I CSPGCL THERMAL-COAL 50000 220376 39000
MTTPS CHAMPA U-II CSPGCL THERMAL-COAL 50000 23709 10000
SHP GANGREL CSPGCL HYDRO-HYDRO 1000 2350 36790
BANGO HEP CSPGCL HYDRO-HYDRO 12000 14662 8900
MHP KORBA WEST CSPGCL HYDRO-HYDRO 170 859 38190
SIKASAR HEP CSPGCL HYDRO-HYDRO 700 418 26870
DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8843 74500
DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 19446 51500
GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 66388 71600
GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127488 41300
KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 96072 43900
KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 29841 56400
SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 184966 58800
UKAI 1-5 GSECL THERMAL-COAL 85000 204891 46900
UKAI TPS 6 GSECL THERMAL-COAL 50000 284448 48200
WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 271999 58300
WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 82808 44100
KADANA HPS GSECL HYDRO-HYDRO 24200 34433 16800
UKAI HPS GSECL HYDRO-HYDRO 30500 40585 6100
TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 123000 11500
BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 8900 10900
BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 7200 27500
JHINNA HPS MPPGCL HYDRO-HYDRO 2000 9700 18500
RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 44300 3400
GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 17300 4600
SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 4100 16900
MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 14600 27000
PENCH HPS MPPGCL HYDRO-HYDRO 16000 23700 8100
RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 3000 16900
AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 134400 35100
SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 283800 38700
SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 344600 34300
SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 111600 61600
SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 211800 58000
SSTPS PH-I MPPGCL THERMAL-COAL 120000 233100 84300
BHUSAWAL TPS MSPGCL THERMAL-COAL 142000 566258 51100
CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1365682 33700
KHAPERKHEDA MSPGCL THERMAL-COAL 134000 706207 39100
KORADI TPS MSPGCL THERMAL-COAL 62000 443206 42000
NASIK TPS MSPGCL THERMAL-COAL 63000 297275 47000
PARLI TPS MSPGCL THERMAL-COAL 113000 175934 71600
PARAS MSPGCL THERMAL-COAL 50000 267931 38700
URAN CCPP MSPGCL THERMAL-GAS 67200 320330 30600
KOYANA MSPGCL HYDRO-HYDRO 195600 328155 13100
SMALL HYDRO POWER PLANTS MSPGCL HYDRO-HYDRO 45400 93062 30500
BHIRA MSPGCL HYDRO-HYDRO 8000 10046 8400
TILLARI MSPGCL HYDRO-HYDRO 8900 10584 3100
SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 233298 20500
SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 87633 20500
PRIVATE SECTOR
Page 36
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 81282 46750
JNSTPP(JAYPEE NIGRIE) JP POWER VENTURES LTD THERMAL-COAL 132000 726695 29310
MB POWER MB POWER THERMAL-COAL 120000 345632 38310
ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 754922 28671
ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 780761 23495
ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 198000 1263784 32090
ADANI POWER MAHARA ADANI POWER LTD THERMAL-COAL 330000 1666191 34124
AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 170065 36827
SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 252035 45129
ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 458551 36000
ESSAR POWER MP LTD ESSAR POWER MP LTD THERMAL-COAL 60000 243040 28600
VEDANTA LTD (P P -I) VEDANTA LTD THERMAL-GAS 3000 15044 24000
VEDANTA LTD (P P -II) VEDANTA LTD THERMAL-GAS 3000 21293 24000
PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 8234600 24000
165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 5850 64390
145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 68717 40349
SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 132655 28776
SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 144686 38567
MUNDRA UMPPCOASTAL GUJARAT POWER
LTD THERMAL-IMP COAL 400000 2530300
23900
LANCO AMARKANTAK TPP PATHADIH
U-ILANCO AMARKAN POWER LTD THERMAL-COAL 30000 195500
29200
LANCO AMARKANTAK TPP PATHADIH
U-IILANCO AMARKAN POWER LTD THERMAL-COAL 30000 206900
27600
BARADARHA TPS D B POWER LTD THERMAL-COAL 120000 677373 29200
JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 405000 28900
JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 453000 40500
DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 339437 40700
TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 293400 44000
TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 137200 37000
TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 174900 44000
BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 92900 14100
BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23700 34300
KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 27600 48300
CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2530300 23900
BHANDARDRA HEP -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 2475 54900
SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 161400 26500
SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 445000 39000
SOTHERN REGION
CENTRAL SECTOR
NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 325699 54820
NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 305532 39880
NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 998805 38510
NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 113016 54070
NEYVELI TAMILNADU POWER LTD JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 625274 42200
VALLUR TPS NTPC TECL THERMAL-COAL 150000 856438 42350
R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 1493 84300
RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1502919 29400
RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 341291 31800
SIMHADRI I NTPC LTD THERMAL-COAL 100000 688382 36800
SIMHADRI II NTPC LTD THERMAL-COAL 100000 663657 43400
KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 593110 31324
MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 291625 21764
KKNPP-1 amp 2 NPCIL NUCLEAR-NUCLEAR 200000 572609 40948
MINICOY LAKSHADEEP THERMAL-DIESEL 340 770 29600
KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1097 29600
AMINI LAKSHADEEP THERMAL-DIESEL 265 509 29600
ANDROTT LAKSHADEEP THERMAL-DIESEL 219 524 29600
KALPENI LAKSHADEEP THERMAL-DIESEL 175 356 29600
AGATTI LAKSHADEEP THERMAL-DIESEL 195 658 29600
KADMAT LAKSHADEEP THERMAL-DIESEL 190 414 29600
KILTAN LAKSHADEEP THERMAL-DIESEL 150 269 29600
CHETLET LAKSHADEEP THERMAL-DIESEL 100 139 29600
BITRA LAKSHADEEP THERMAL-DIESEL 043 024 29600
BANGARAM LAKSHADEEP THERMAL-DIESEL 018 009 29600
Page 37
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) STATE SECTOR
Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 721811 46500
Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 50000 336142 46500
RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 237358 46500
RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 239926 46500
RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 124500 46500
SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 62109 46500
UPPER SILERU APGENCO HYDRO-HYDRO 24000 33000 46500
LOWER SILERU APGENCO HYDRO-HYDRO 46000 81066 46500
DONKARAI APGENCO HYDRO-HYDRO 2500 6007 46500
PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 1262 46500
CHETTIPETA APGENCO HYDRO-HYDRO 100 214 46500
MUCHKUND APGENCO HYDRO-HYDRO 12000 37571 46500
NAGARJUNASAGAR RCPH APGENCO HYDRO-HYDRO 9000 606 46500
TUNGABHADRA HES amp HAMPI(AP
Share)
APGENCO HYDRO-HYDRO 7200 6100 46500
KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 352232 42600
KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 288131 32500
KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 319272 46500
RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 40073 44300
KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 308317 46000
KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 308963 51300
SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 61004 76600
NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 17960 75300
PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 20873 58300
POCHAMPAD-I TSPGENCO HYDRO-HYDRO 2700 5455 29800
POCHAMPAD-II TSPGENCO HYDRO-HYDRO 900 1932 40700
NIZAMSAGAR TSPGENCO HYDRO-HYDRO 1000 1126 53400
RAICHUR TPS 1 to 7 KPCL THERMAL-COAL 147000 890866 43800
RAICHUR TPS 8 KPCL THERMAL-COAL 25000 159523 48200
BELLARI TPS 1 KPCL THERMAL-COAL 50000 318679 51100
BELLARI TPS 2 KPCL THERMAL-COAL 50000 232347 55600
BELLARI TPS 3 KPCL THERMAL-COAL 70000 47565 34400
BHADRA PH KPCL HYDRO-HYDRO 3920 2369 45900
GERUSUPPA PH KPCL HYDRO-HYDRO 24000 26990 22000
GHAT PRABHA HEP KPCL HYDRO-HYDRO 3200 4777 25300
KADRA HPS KPCL HYDRO-HYDRO 15000 16889 26800
NAGJHARI KPCL HYDRO-HYDRO 90000 155159 9800
KODASALLI DPH KPCL HYDRO-HYDRO 12000 14854 19200
MUNIRA+MGH+SPH+SPH KPCL HYDRO-HYDRO 22640 48211 7900
SHARAVATHY HPS KPCL HYDRO-HYDRO 108550 276215 5400
ALMATTI DPH KPCL HYDRO-HYDRO 29000 39611 24600
VARAHI UGPH KPCL HYDRO-HYDRO 46000 71368 15600
IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 17196 15300
IDUKKI HPS KSEB HYDRO-HYDRO 78000 137905 15300
KAKKAD HPS KSEB HYDRO-HYDRO 5000 13063 15300
KALLADA HPS KSEB HYDRO-HYDRO 1500 4436 15300
KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 46544 15300
KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 635 15300
LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 30822 15300
MALANKARA HPS KSEB HYDRO-HYDRO 1050 2474 15300
MATTUPETTY KSEB HYDRO-HYDRO 200 230 15300
MALAMPUZHA KSEB HYDRO-HYDRO 250 063 15300
CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 864 15300
URUMI ST I amp II KSEB HYDRO-HYDRO 615 903 15300
LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 248 15300
NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7765 19625 15300
PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 16601 15300
PANNIAR HPS KSEB HYDRO-HYDRO 3240 6217 15300
PORINGALKUTHU KSEB HYDRO-HYDRO 3600 10052 15300
PORINGALKUTHU LBE KSEB HYDRO-HYDRO 1600 9438 15300
PEPPARA KSEB HYDRO-HYDRO 300 395 15300
POOZHITHODE KSEB HYDRO-HYDRO 480 1045 15300
Page 38
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) PEECHI KSEB HYDRO-HYDRO 125 040 15300
RANI-PERUNADU KSEB HYDRO-HYDRO 400 585 15300
SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 79783 15300
SENGULAM HPS KSEB HYDRO-HYDRO 5120 11558 15300
SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 16711 15300
VILANGAD KSEB HYDRO-HYDRO 750 1578 15300
BARAPOLE KSEB HYDRO-HYDRO 1500 1932 15300
VELLATHOOVAL KSEB HYDRO-HYDRO 360 305 15300
CHIM0NY KSEB HYDRO-HYDRO 250 156 15300
ADYANPARA KSEB HYDRO-HYDRO 350 501 15300
BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 554 15300
KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 3801 15300
KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 23132 32800
ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 14416 62280
METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 523970 62280
METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 321270 62280
NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 336575 62280
NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 591240 62280
TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 508966 62280
KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 30897 62280
VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 18720 90699 62280
KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 33593 62280
BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 1047 62280
PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 1250 62280
PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 330 62280
MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 4897 62280
MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 032 62280
KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15681 62280
KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 40608 62280
KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 21342 62280
KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 4717 62280
KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4322 62280
KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2399 62280
METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 4416 62280
METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 8035 62280
BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2187 62280
BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2359 62280
BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2511 62280
BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 1949 62280
BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 1819 62280
POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 172 62280
SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 241 62280
MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 026 62280
THIRUMOORTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 136 62280
PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 9309 62280
VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 353 62280
SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 4192 62280
PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 6571 62280
SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 1186 62280
SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6319 62280
ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 6122 62280
KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 28674 62280
SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 18381 62280
SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 4258 62280
KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 12680 62280
KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4201 62280
ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 000 62280
PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 19175 62280
AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 078 62280
BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 504 62280
BHAVANI KATTALAI (BKB)(IIIampIII BB I amp II)TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 5847 62280
PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 000 62280
Page 39
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) SRI DAMODARAM STPS APPDCL THERMAL-COAL 160000 808108 36300
PRIVATE SECTOR
KARUPPUR TANJORE LANCO TANJORE PCL THERMAL-GAS 12000 48096 28770
SIMHAPURI ENERGY LTD SIMHAPURI ENERGY LTD THERMAL-COAL 60000 143900 39100
JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 7111 45500
SBU 1 JSW ENERGY LTD
VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 26000 159100
43300
SBU 2 JSW ENERGY LTD
VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 60000 247900
42800
LANCO KPLLANCO KONDAPALLI POWER
LTDTHERMAL-GAS 36814 85060
25776
LANCO KPL STG -IILANCO KONDAPALLI POWER
LTDTHERMAL-GAS 36600 12979
46330
LANCO KPL STG -IIIALANCO KONDAPALLI POWER
LTDTHERMAL-GAS 37100 85710
46330
LANCO KPL STG -III BLANCO KONDAPALLI POWER
LTDTHERMAL-GAS 37100 43639
46330
HINDUJA NATIONAL PCL HINDUJA NATIONAL PCL THERMAL-COAL 104000 303000 38200
MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 121164 49940
UDUPI POWER COR LTD ADANI POWER LTD THERMAL-COAL 120000 754613 42500
SPECTRUM POWER GENERATION
LTD SPECTRUM PG LTD THERMAL-GASN 20525 9256812
34952
TAQA NEYVELI POWER COM PVT
LTD TAQA NEYVELI THERMAL-LIG 25000 5840
34500
ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 251000 51000
ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 207860 36800
GMR VEMAGIRI POWER GENERATION
LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 30117
46450
EASTERN REGION
CENTRAL SECTOR
MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 64675 53113
MTPS STAGE - II KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 39000 1432 69138
BOKARO `B` TPS DVC THERMAL-COAL 63000 145670 31539
MEJIA TPS U 1-3 DVC THERMAL-COAL 63000 348298 31552
MEJIA TPS U 4 DVC THERMAL-COAL 21000 116099 34997
MEJIA TPS U 5-6 DVC THERMAL-COAL 50000 276427 35976
MEJIA TPS U 7-8 DVC THERMAL-COAL 100000 552854 36991
DURGAPUR STEEL TPS DVC THERMAL-COAL 100000 665550 39323
DURGAPUR TPS DVC THERMAL-COAL 21000 59270 35416
RAGHUNATHPUR TPS DVC THERMAL-COAL 120000 201650 35326
MAITHON HYDEL STA DVC HYDRO-HYDRO 6320 12200 17984
CHANDRAPURA TPSU1-3 DVC THERMAL-COAL 42000 257610 35095
CHANDRAPURA TPSU7-8 DVC THERMAL-COAL 50000 306673 34987
KODERMA TPS DVC THERMAL-COAL 100000 380180 38131
PANCHET HPS DVC HYDRO-HYDRO 8000 13360 17984
TILLAYA HPS DVC HYDRO-HYDRO 400 1410 17984
RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34700 35400
TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 277300 23200
TLDP -III NHPC LTD HYDRO-HYDRO 13200 55400 62000
TLDP -IV NHPC LTD HYDRO-HYDRO 16000 60300 25600
FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 957219 33700
FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 308943 41000
BONGAINGAON TPS NTPC LTD THERMAL-COAL 25000 153663 58600
KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 542277 34200
KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 942591 34200
BARH-II NTPC LTD THERMAL-COAL 132000 728021 44500
TALCHER TPS NTPC LTD THERMAL-COAL 46000 335521 30100
TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 702319 25600
TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1436521 24700
STATE SECTOR
BTPS(RampM) BIHAR STATE PGCL THERMAL-COAL 22000 12142 39700
BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 98331 10602
HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 50593 9482
CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 19689 2605
RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 53192 6033
UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 147208 14637
Page 40
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 60353 4519
IB TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 288567 25000
J P H GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 210 038 61100
MEYONG CHU GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 400 1086 61100
TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 122667 38200
DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 214339 43321
KOLAGHAT THERMAL POWER
STATION
WEST BENGAL PDCL THERMAL-COAL 126000 538269 31603
BAKRESHWAR THERMAL POWER
PLANT
WEST BENGAL PDCL THERMAL-COAL 105000 634876 32154
BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 45000 166855 33299
SANTHALDIH THERMAL POWER
STATION
WEST BENGAL PDCL THERMAL-COAL 50000 336442 34932
SAGARDIGHI THERMAL POWER
PROJECT
WEST BENGAL PDCL THERMAL-COAL 160000 423121 34705
JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 20344 68900
RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 24559 68900
TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 4623 68900
PURULIA PUMPED STORAGE
PROJECT
WEST BENGAL SEDCL HYDRO-HYDRO 90000 108816 68900
MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2768 68900
PRIVATE SECTOR
CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 49474 20230
CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 555500 70200
HALDIA ENERGY HALDIA ENERGY LTD THERMAL-COAL 60000 371000 50400
DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3688 63400
KAMALANGA TPS GMR KAMALANGA ENERGY LTD THERMAL-COAL 105000547670
33300
ADHUNIK POWER U-1 ADHUNIK POWER THERMAL-COAL 27000 158 44060
ADHUNIK POWER U-2 ADHUNIK POWER THERMAL-COAL 27000 168 44250
VL-JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 332800 23622
JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 43000 45250
JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 71700 37030
JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 70700 35920
JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 71100 38870
JOJOBERA UNIT 5 TATA POWER COM LTD THERMAL-COAL 12000 79300 44560
JOJOBERA UNIT 6 TATA POWER COM LTD THERMAL-WHR 12000 83700 12840
IEL KALINGANAGAR U-I TATA POWER COM LTD THERMAL-WG 6750 33400 22500
IEL KALINGANAGAR U-II TATA POWER COM LTD THERMAL-WG 6750 34800 22500
MAITHON UNIT 1 amp 2 TATA POWER COM LTD THERMAL-COAL 105000 678000 36100
HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 27500 24340
HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 28400 24340
HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 15800 24310
NORTH EASTERN REGION
CENTRAL SECTOR
LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 74100 36600
AGARTALA GT NEEPCO THERMAL-GAS 13500 88611 27210
ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 153111 32310
DOYANG HEP NEEPCO HYDRO-HYDRO 7500 25598 49801
KOPILI HEP NEEPCO HYDRO-HYDRO 20000 98186 11491
KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 19582 20237
KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 10310 17968
RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 124093 22945
TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 10100 17344 39000
STATE SECTOR
HYDRO POWER (122 Stns) ITANAGAR GOVT OF ARUNACHAL
PRADESHHYDRO-HYDRO 6971 6217270
24600
KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39514 17337
LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 82327 36810
NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 33318 48290
MYNTRIANG SHEP ST II ASSAM POWER GENCO HYDRO-HYDRO 300 567 35776
LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 9130 49200
LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 012 49200
DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 022 49200
TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 000 49200
UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 4990 16000
UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 6476 37000
UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 16494 14600
UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 3600 9556 15000
SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 758 8000
MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44070 44800
KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 154 41400
TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 091 41400
MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 411 41400
MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 394 41400
KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 760 41400
SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 3264 41400
LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 044 41400
BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 18953 28000
ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 43585 28200
GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 4080 11100
Note
LIG Lignite N Naptha WHR Waste Heat Recovery
Page 41
(In MW)
Coal Gas Diesel Total
End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472
End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634
End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537
End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596
End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921
End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703
End of 12th Plan 19216288 2532938 83763 21832988 6780 4447842 50018 31960630
Up to Apr-2019 20070450 2493722 63763 22627934 678000 4539922 7764163 35610019
Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-17) = 51529 MW
Electricity Generation (MU) Targets and Achievements for 2016-17
Coal Gas Diesel Nuclear Hydro Res Total
2007045 2493722 637629 678000 453992 77641625 22925174
29
1 Growth of Installed Capacity Since 6th Plan
Plan YearThermal
Nuclear Hydro RES (MNRE) Total
2007045
2493722637629
678000
4539922
77641625
Total Installed Capacity 35610019 MW
Coal Gas Diesel Nuclear Hydro Res
Progress of Transmission Sector in the Country up to April 2019
1 TRANSMISSION LINES (All fig in CKM)
At the end of
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
6th plan 0 0 0 0 0 0 0 0 0 0 0 0 1831 4198 0 6029 1641 44364 0 46005 3472 48562 0 52034
7th plan 0 0 0 0 0 0 0 0 0 0 0 0 13068 6756 0 19824 4560 55071 0 59631 17628 61827 0 79455
8th plan 0 0 0 0 1634 0 0 1634 0 0 0 0 23001 13141 0 36142 6564 73036 0 79600 31199 86177 0 117376
9th plan 0 0 0 0 3234 1504 0 4738 751 409 0 1160 29345 20033 0 49378 8687 88306 0 96993 42017 110252 0 152269
10th plan 0 0 0 0 4368 1504 0 5872 1775 409 0 2184 48708 24730 0 73438 9444 105185 0 114629 64295 131828 0 196123
11th Plan 0 0 0 0 5948 1504 1980 9432 4839 411 0 5250 71023 30191 5605 106819 10140 125010 830 135980 91950 157116 8415 257481
12th Plan 6124 0 0 6124 5948 1504 1980 9432 25465 1177 4598 31240 92482 48240 17065 157787 11014 151276 978 163268 141033 202197 24621 367851
13th Plan (Up
to Mar2019)6124 0 0 6124 5948 1504 1980 9432 33692 1512 6605 41809 101335 58238 21173 180746 11734 162552 1010 175296 158833 223806 30768 413407
13th Plan (Up
to Apr-19)6124 0 0 6124 5948 1504 1980 9432 33745 1512 6605 41862 101335 58258 21173 180766 11734 162953 1010 175697 158886 224227 30768 413881
27150 600 MW of 132 kV Inter-Regional power transmission capacity links which are operated radially from time to time is not added in the total
75050
47900
24000
99050
30
Grand Total
Note - The figure upto the end of 10th plan in for stringing progress including the lines not commissioned Now only commissioned lines are reckoned Accordingly the figure for 10th plan (end) may read
as 187555 after adjusting with (-) 10852 Ckm
Inter-regional Power Transfer Capacity (MW)
plusmn 800 kV HVDC plusmn 500 kV HVDC 765 kV 400 kV 220 kV
IR addition in 12th
Plan (up to March
2017)
Inter-regional
Transmission
Capacity at the end
of Plan Period 2017-
22 (as on April19)
IR at the end of 11th
PlanIR at the end of 12th
Plan
IR Capacity Addition
at the end of Plan
Period 2017-22 (Till
April 19)
2004-05 27800
2005-06 28100
2006-07 30200
2007-08 33000
2008-09 35500
2009-10 36700
2010-11 38700
2011-12 41756
2012-13 45460
2013-14 48940
2014-15 53040
2015-16 54590
2016-17 57430
2017-18 60800
2018-19 62890
Year
2005-06
2006-07
2007-08
2008-09
2009-10
2010-11
2011-12
2012-13
2013-14
2014-15
2015-16
2016-17
2017-18
2018-19
2004-05 254 209 7568
2005-06 260 221 7636
2006-07 276 227 7423
2007-08 293 239 7727
2008-09 340 263 8713
2009-10 355 268 8870
2010-11 398 303 11975
2011-12 455 330 13514
2012-13 501 376 14867
2013-14 518 175
2014-15 520
Source- PFC Reports on the performance of State Power Utilities 31
1181
7335
7786
91441
8188
88363
957
1010
1075
1122
1149
(GrossGen+ Net Import) Mid-year population Provisional
5 Average cost of power supply amp average realization ( paiseKWH )
Yearcost of supply
(paiseunit)
Realization(paiseunit)
Including AgricultureOnly
Agriculture
6719
7171
3 All India yearly Coal Consumption for Power Generation (Utilities)
YEARCoal Consumption
Million Tonnes
4 All India Annual per Capita consumption of Electricity Since 2006
Per Capita Consumption ( kWh)
6314
Sl
NoExecuting Agency
Installed
Capacity (MW)Cost (Rs crore)
Date of
Clearance
32
Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as
Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received
from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made
available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified
villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is
independent of the earlier published reports
No Hydro Electric Project has been issued concurrenceAppraisal letter by CEA during April 2019
7 Status of Hydro Schemes Cleared by the CEA in Apr-2019
Name of Scheme
1999-002000-01
297594
010408 to 310309010409 to 310310
10th Plan
2005-062006-07
322968331020
6 Growth Of Rural Electrification amp Pumpsets Energisation
Plan Year
9th Plan2002-03
134092626
4111
Pump Sets Energised Villages Electricfied (Nos)
2001-02
284064367244
1218
27801997-981998-99
3207
482864
12632
1576036
4451722594
15455554
2314176
397343611750
2093311060316074
65109527813884
46708
18423975
499150
2003-042004-05
5743
9769
Cumu upto End of 10th Plan
010407 to 310308
010410 to 310311557976840909
010411 to 310312
412667
86293726
No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification
since 2004-05
65291374575 296361511th Plan
Cumu upto End of 11th Plan
596556 21212860
557439Cummulative up to end of 12th Plan
SN Contents Page
1 Rate of sale of power for the year 2016-17 33-41
RATE OF SALE OF POWER FOR THE YEAR 2016-17
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) NORTHERN REGION
CENTRAL SECTOR
BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 18000 66900 19800
CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 54000 222400 21600
CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 30000 144400 19600
CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 23100 91700 42600
PARBATI - III HPS NHPC LTD HYDRO-HYDRO 52000 68200 54800
DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 28000 95600 30000
CHUTAK NHPC LTD HYDRO-HYDRO 4400 22000 79800
DULHASTI HPS NHPC LTD HYDRO-HYDRO 39000 228000 56400
SALAL HPS NHPC LTD HYDRO-HYDRO 69000 342300 11000
TANAKPUR HPS NHPC LTD HYDRO-HYDRO 9420 43000 29600
URI HPS -I NHPC LTD HYDRO-HYDRO 48000 280300 16000
URI HPS - II NHPC LTD HYDRO-HYDRO 24000 147300 48600
NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 4500 24600 88200
SEWA - II NHPC LTD HYDRO-HYDRO 12000 47100 43400
ANTA CCPP NTPC LTD THERMAL-GASN 41930 67539 32400
AURAIYA CCPP NTPC LTD THERMAL-GASN 66336 53501 39100
BADARPUR TPS NTPC LTD THERMAL-COAL 70500 159153 44800
DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 84000 296170 42300
DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 98000 526686 46300
DADRI CCPP NTPC LTD THERMAL-GASHSD 82978 227469 33000
FARIDABAD CCPP NTPC LTD THERMAL-GASN 43159 115577 30800
RIHAND STPS I NTPC LTD THERMAL-COAL 100000 596766 24500
RIHAND STPS II NTPC LTD THERMAL-COAL 100000 737069 24600
RIHAND STPS III NTPC LTD THERMAL-COAL 100000 706546 30600
SINGRAULI STPS NTPC LTD THERMAL-COAL 200000 1394068 20400
TANDA TPS NTPC LTD THERMAL-COAL 44000 295438 40800
UNCHAHAR TPS I NTPC LTD THERMAL-COAL 42000 256454 39800
UNCHAHAR TPS II NTPC LTD THERMAL-COAL 42000 273577 38900
UNCHAHAR TPS III NTPC LTD THERMAL-COAL 21000 142780 43000
KOLDAM NTPC LTD HYDRO-HYDRO 80000 363260 43600
NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 303575 25841
RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 108000 668677 35374
NJHPS SJVNL HYDRO-HYDRO 150000 699496 23820
RAMPUR HPS SJVNL HYDRO-HYDRO 41202 195982 32260
TEHRI HPP THDC HYDRO-HYDRO 100000 272543 51800
KOTESHWAR HEP THDC HYDRO-HYDRO 40000 106244 53400
IGSTPS JHAJJAR ARAVALI P CPL THERMAL-COAL 150000 510429 49490
NEYVELI BARSINGSAR NEYVELI LIG CORP LTD THERMAL-LIG 25000 127520 38040
STATE SECTOR
PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 21000 14222 48200
PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 21000 19205 48400
PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 25000 102257 42600
PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 25000 62107 41800
DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 60000 312213 41000
RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 120000 35767442200
WYC HYDEL STATION HPGCL HYDRO-HYDRO 6240 20365 24900
GIRI POWER HOUSE HPSEB HYDRO-HYDRO 6000 13958 7600
ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 1695 5467 11900
BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 12000 18528 6700
GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 2250 7462 22500
BASSI POWER HOUSE HPSEB HYDRO-HYDRO 6600 29649 7500
BINWA POWER HOUSE HPSEB HYDRO-HYDRO 600 2749 19300
ANNEXURE-I
RATE OF SALE OF POWER FOR THE YEAR 2016-2017
Page 33
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) GAJ POWER HOUSE HPSEB HYDRO-HYDRO 1050 2914 26700
BANER POWER HOUSE HPSEB HYDRO-HYDRO 1200 2864 16200
HOLI POWER HOUSE HPSEB HYDRO-HYDRO 300 616 22500
THIROT POWER HOUSE HPSEB HYDRO-HYDRO 450 1126 22500
KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 1200 3064 22500
LARJI POWER HOUSE HPSEB HYDRO-HYDRO 12600 53677 23700
NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 250 750 31000
CHABA POWER HOUSE HPSEB HYDRO-HYDRO 175 465 23300
RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 150 101 13400
SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 200 000 22500
KILLAR HPSEB HYDRO-HYDRO 030 050 22500
BHABA AUGUMENP H HPSEB HYDRO-HYDRO 450 1276 22500
BS CHAMBA HPSEB HYDRO-HYDRO 045 099 19500
GUMMA HPSEB HYDRO-HYDRO 300 423 22500
GAS TURBINE POWER STATION IPGCL THERMAL-GAS 27000 67233 39300
PPS-I PPCL THERMAL-GAS 33000 175905 38300
PPS-III PPCL THERMAL-GAS 137120 196879 36100
LOWER JHELUM JampKPDD HYDRO-HYDRO 10500 60214 5100
UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 2260 10514 6300
UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 10500 44202 8500
GANDHARBAL JampKPDD HYDRO-HYDRO 1500 8925 4700
KARNAH MPH JampKPDD HYDRO-HYDRO 200 1122 31000
CHENANI I JampKPDD HYDRO-HYDRO 2330 10892 6600
CHENANI II JampKPDD HYDRO-HYDRO 200 1188 9300
CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 750 3634 14200
IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 375 2108 18500
IGO MERCHELLONG JampKPDD HYDRO-HYDRO 300 1572 29700
PAHALGAM MHP JampKPDD HYDRO-HYDRO 450 1713 32900
MARPACHOO JampKPDD HYDRO-HYDRO 075 375 29800
HAFTAL JampKPDD HYDRO-HYDRO 100 483 28700
SANJAK JampKPDD HYDRO-HYDRO 126 441 36000
SEWA-III JampKPDD HYDRO-HYDRO 900 3273 20200
BHADERWAH JampKPDD HYDRO-HYDRO 150 935 8900
BAZGO JampKPDD HYDRO-HYDRO 030 108 33300
SUMOOR JampKPDD HYDRO-HYDRO 010 045 35400
HUNDER JampKPDD HYDRO-HYDRO 040 176 26200
STAKNA JampKPDD HYDRO-HYDRO 400 1933 4100
KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 124000 662879 31360
SURATGARH TPS RRVUNL THERMAL-COAL 150000 402328 41730
CHHABRA TPS 1amp 2 RRVUNL THERMAL-COAL 50000 305946 36700
CHHABRA TPS 3 RRVUNL THERMAL-COAL 25000 151536 36700
CHHABRA TPS 4 RRVUNL THERMAL-COAL 25000 155896 36700
RAMGARH GT POWER PROJECT RRVUNL THERMAL-COAL 22050 43177 41800
RAMGARH GAS T P PROJECT 3 RRVUNL THERMAL-GAS 5000 93615 41800
DHOLPUR C C POWER PROJECT RRVUNL THERMAL-R-LNG 33000 9486 46110
MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 14000 20855 34192
MINI MICRO HYDEL (MMH) P S RRVUNL HYDRO-HYDRO 2385 851 37800
KALISINDH TPP 1 RRVUNL THERMAL-COAL 60000 341543 45000
KALISINDH TPP 2 RRVUNL THERMAL-COAL 60000 211588 45000
KHARA HEP UPJVNL HYDRO-HYDRO 7200 26654 7200
MATATILLA HEP UPJVNL HYDRO-HYDRO 3060 12219 6500
OBRA HEP UPJVNL HYDRO-HYDRO 9900 21517 6300
RIHAND UPJVNL HYDRO-HYDRO 30000 57369 5500
ANPARA A TPS UPRVUNL THERMAL-COAL 63000 317536 27000
ANPARA B TPS UPRVUNL THERMAL-COAL 100000 705605 22700
ANPARA D UPRVUNL THERMAL-COAL 100000 300158 39800
HARDUAGANJ TPS UPRVUNL THERMAL-COAL 16500 45817 49200
HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 50000 304389 46600
OBRA A TPS UPRVUNL THERMAL-COAL 28800 13158 34000
OBRA B TPS UPRVUNL THERMAL-COAL 100000 328124 21900
Page 34
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) PANKI TPS UPRVUNL THERMAL-COAL 21000 66488 50300
PARICHHA TPS UPRVUNL THERMAL-COAL 22000 38762 49400
PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 42000 231931 45600
PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 50000 276722 50400
CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 24000 70845 8290
CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 14400 75366 8390
DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 3375 9595 12080
DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 5100 18701 10520
KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4140 17359 12330
KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 12000 33001 9420
KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 3000 11953 8320
TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 9000 33983 12460
MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 30400 124510 16110
RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 19800 17897 10550
MPUR UTTARAKHAND JVNL HYDRO-HYDRO 930 5121 19200
PATHRI UTTARAKHAND JVNL HYDRO-HYDRO 2040 11636 14200
GALOGI UTTARAKHAND JVNL HYDRO-HYDRO 300 648 12500
PRIVATE SECTOR
MGTPP CLP INDIA PVT LTD THERMAL-COAL 132000 268902 41940
SHRINAGAR HEP ALAKNANDA HPCL HYDRO-HYDRO 33000 127414 48800
GAMA INFRAPROP CCPP GAMA INFRAPROP PVT THERMAL-GAS 22500 52686 47000
PPGCL (BARA) JP POWER VENTURES LTD THERMAL-COAL 198000 448200 38500
MALANA HEP MALANA PCL HYDRO-HYDRO 8600 26354 29792
MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 10000 30369 32580
ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 19200 56347 36079
KASHANG HEP H P PCL HYDRO-HYDRO 19500 5034 29200
BASPA-II HEP HBPCL HYDRO-HYDRO 30000 132769 13600
KARCHAM WANGTOO HEP HBPCL HYDRO-HYDRO 100000 434386 36600
RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 108000 582600 43700
RITHALA COMBI CY POWER PLANT TATA POWER DDL THERMAL-GAS 9480 000 11900
RAJPURA TPS NABHA POWER LTD THERMAL-GAS 140000 901484 39000
TALWANDI SABO POWER LTD TALWANDI SABO POWER LTD THERMAL-COAL 198000 636040 49548
ROJA THERMAL POWER STATION ROJA POWER SCL THERMAL-COAL 120000 727200 43400
KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 34400 63400
BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 36000 62600
MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 38200 60800
UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 37900 61500
KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 42300 58800
LALITPUR PGCL BAJAJ ENERGY PVT LTD THERMAL-COAL 198000 359400 47300
PRAYAGRAJ PGCL PRAYAGRAJ PGCL THERMAL-COAL 132000 448200 38595
KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 132000 783182 33438
WESTERN REGION
CENTRAL SECTOR
INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 100000 325333 23892
OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 52000 141663 34001
GANDHAR CCPP NTPC LTD THERMAL-GAS 65739 221924 28700
KAWAS CCPP NTPC LTD THERMAL-GASN 65620 167929 27000
KORBA I amp II NTPC LTD THERMAL-COAL 210000 1499171 20500
KORBA III NTPC LTD THERMAL-COAL 50000 358746 26600
SIPAT STPS I NTPC LTD THERMAL-COAL 198000 1479902 26800
SIPAT STPS II NTPC LTD THERMAL-COAL 100000 766549 26500
VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 126000 693142 25800
VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 100000 608781 23800
VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 100000 673475 27600
VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 100000 655924 32900
VINDHYACHAL STPS V NTPC LTD THERMAL-COAL 50000 328265 31700
MOUDA I NTPC LTD THERMAL-COAL 100000 343130 44500
MOUDA Ii NTPC LTD THERMAL-COAL 66000 40637 39900
RATNAGIRI GAS amp POWER PVT LTD RGPPL THERMAL-GAS 196708 442485 47000
KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 000 24729
TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 32000 201227 10740
Page 35
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 365122 19069
TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 787444 29324
STATE SECTOR
GSEG-HAZIRA15610 MW GUJARAT S ENEGEN LTD THERMAL-GAS 15610 1805 28200
GSEG-HAZIRA35143 MW GUJARAT S ENEGEN LTD THERMAL-GAS 35130 22276 51300
GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 21978 51800
AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 13929 26100
KORBA TPS EAST CSPGCL THERMAL-COAL 44000 198673 33880
DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 365808 27570
KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 316500 30420
HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 532878 19410
CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 515 58300
MTTPS CHAMPA U-I CSPGCL THERMAL-COAL 50000 220376 39000
MTTPS CHAMPA U-II CSPGCL THERMAL-COAL 50000 23709 10000
SHP GANGREL CSPGCL HYDRO-HYDRO 1000 2350 36790
BANGO HEP CSPGCL HYDRO-HYDRO 12000 14662 8900
MHP KORBA WEST CSPGCL HYDRO-HYDRO 170 859 38190
SIKASAR HEP CSPGCL HYDRO-HYDRO 700 418 26870
DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8843 74500
DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 19446 51500
GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 66388 71600
GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127488 41300
KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 96072 43900
KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 29841 56400
SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 184966 58800
UKAI 1-5 GSECL THERMAL-COAL 85000 204891 46900
UKAI TPS 6 GSECL THERMAL-COAL 50000 284448 48200
WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 271999 58300
WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 82808 44100
KADANA HPS GSECL HYDRO-HYDRO 24200 34433 16800
UKAI HPS GSECL HYDRO-HYDRO 30500 40585 6100
TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 123000 11500
BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 8900 10900
BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 7200 27500
JHINNA HPS MPPGCL HYDRO-HYDRO 2000 9700 18500
RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 44300 3400
GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 17300 4600
SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 4100 16900
MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 14600 27000
PENCH HPS MPPGCL HYDRO-HYDRO 16000 23700 8100
RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 3000 16900
AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 134400 35100
SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 283800 38700
SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 344600 34300
SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 111600 61600
SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 211800 58000
SSTPS PH-I MPPGCL THERMAL-COAL 120000 233100 84300
BHUSAWAL TPS MSPGCL THERMAL-COAL 142000 566258 51100
CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1365682 33700
KHAPERKHEDA MSPGCL THERMAL-COAL 134000 706207 39100
KORADI TPS MSPGCL THERMAL-COAL 62000 443206 42000
NASIK TPS MSPGCL THERMAL-COAL 63000 297275 47000
PARLI TPS MSPGCL THERMAL-COAL 113000 175934 71600
PARAS MSPGCL THERMAL-COAL 50000 267931 38700
URAN CCPP MSPGCL THERMAL-GAS 67200 320330 30600
KOYANA MSPGCL HYDRO-HYDRO 195600 328155 13100
SMALL HYDRO POWER PLANTS MSPGCL HYDRO-HYDRO 45400 93062 30500
BHIRA MSPGCL HYDRO-HYDRO 8000 10046 8400
TILLARI MSPGCL HYDRO-HYDRO 8900 10584 3100
SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 233298 20500
SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 87633 20500
PRIVATE SECTOR
Page 36
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 81282 46750
JNSTPP(JAYPEE NIGRIE) JP POWER VENTURES LTD THERMAL-COAL 132000 726695 29310
MB POWER MB POWER THERMAL-COAL 120000 345632 38310
ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 754922 28671
ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 780761 23495
ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 198000 1263784 32090
ADANI POWER MAHARA ADANI POWER LTD THERMAL-COAL 330000 1666191 34124
AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 170065 36827
SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 252035 45129
ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 458551 36000
ESSAR POWER MP LTD ESSAR POWER MP LTD THERMAL-COAL 60000 243040 28600
VEDANTA LTD (P P -I) VEDANTA LTD THERMAL-GAS 3000 15044 24000
VEDANTA LTD (P P -II) VEDANTA LTD THERMAL-GAS 3000 21293 24000
PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 8234600 24000
165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 5850 64390
145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 68717 40349
SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 132655 28776
SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 144686 38567
MUNDRA UMPPCOASTAL GUJARAT POWER
LTD THERMAL-IMP COAL 400000 2530300
23900
LANCO AMARKANTAK TPP PATHADIH
U-ILANCO AMARKAN POWER LTD THERMAL-COAL 30000 195500
29200
LANCO AMARKANTAK TPP PATHADIH
U-IILANCO AMARKAN POWER LTD THERMAL-COAL 30000 206900
27600
BARADARHA TPS D B POWER LTD THERMAL-COAL 120000 677373 29200
JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 405000 28900
JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 453000 40500
DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 339437 40700
TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 293400 44000
TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 137200 37000
TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 174900 44000
BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 92900 14100
BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23700 34300
KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 27600 48300
CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2530300 23900
BHANDARDRA HEP -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 2475 54900
SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 161400 26500
SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 445000 39000
SOTHERN REGION
CENTRAL SECTOR
NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 325699 54820
NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 305532 39880
NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 998805 38510
NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 113016 54070
NEYVELI TAMILNADU POWER LTD JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 625274 42200
VALLUR TPS NTPC TECL THERMAL-COAL 150000 856438 42350
R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 1493 84300
RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1502919 29400
RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 341291 31800
SIMHADRI I NTPC LTD THERMAL-COAL 100000 688382 36800
SIMHADRI II NTPC LTD THERMAL-COAL 100000 663657 43400
KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 593110 31324
MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 291625 21764
KKNPP-1 amp 2 NPCIL NUCLEAR-NUCLEAR 200000 572609 40948
MINICOY LAKSHADEEP THERMAL-DIESEL 340 770 29600
KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1097 29600
AMINI LAKSHADEEP THERMAL-DIESEL 265 509 29600
ANDROTT LAKSHADEEP THERMAL-DIESEL 219 524 29600
KALPENI LAKSHADEEP THERMAL-DIESEL 175 356 29600
AGATTI LAKSHADEEP THERMAL-DIESEL 195 658 29600
KADMAT LAKSHADEEP THERMAL-DIESEL 190 414 29600
KILTAN LAKSHADEEP THERMAL-DIESEL 150 269 29600
CHETLET LAKSHADEEP THERMAL-DIESEL 100 139 29600
BITRA LAKSHADEEP THERMAL-DIESEL 043 024 29600
BANGARAM LAKSHADEEP THERMAL-DIESEL 018 009 29600
Page 37
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) STATE SECTOR
Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 721811 46500
Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 50000 336142 46500
RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 237358 46500
RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 239926 46500
RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 124500 46500
SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 62109 46500
UPPER SILERU APGENCO HYDRO-HYDRO 24000 33000 46500
LOWER SILERU APGENCO HYDRO-HYDRO 46000 81066 46500
DONKARAI APGENCO HYDRO-HYDRO 2500 6007 46500
PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 1262 46500
CHETTIPETA APGENCO HYDRO-HYDRO 100 214 46500
MUCHKUND APGENCO HYDRO-HYDRO 12000 37571 46500
NAGARJUNASAGAR RCPH APGENCO HYDRO-HYDRO 9000 606 46500
TUNGABHADRA HES amp HAMPI(AP
Share)
APGENCO HYDRO-HYDRO 7200 6100 46500
KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 352232 42600
KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 288131 32500
KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 319272 46500
RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 40073 44300
KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 308317 46000
KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 308963 51300
SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 61004 76600
NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 17960 75300
PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 20873 58300
POCHAMPAD-I TSPGENCO HYDRO-HYDRO 2700 5455 29800
POCHAMPAD-II TSPGENCO HYDRO-HYDRO 900 1932 40700
NIZAMSAGAR TSPGENCO HYDRO-HYDRO 1000 1126 53400
RAICHUR TPS 1 to 7 KPCL THERMAL-COAL 147000 890866 43800
RAICHUR TPS 8 KPCL THERMAL-COAL 25000 159523 48200
BELLARI TPS 1 KPCL THERMAL-COAL 50000 318679 51100
BELLARI TPS 2 KPCL THERMAL-COAL 50000 232347 55600
BELLARI TPS 3 KPCL THERMAL-COAL 70000 47565 34400
BHADRA PH KPCL HYDRO-HYDRO 3920 2369 45900
GERUSUPPA PH KPCL HYDRO-HYDRO 24000 26990 22000
GHAT PRABHA HEP KPCL HYDRO-HYDRO 3200 4777 25300
KADRA HPS KPCL HYDRO-HYDRO 15000 16889 26800
NAGJHARI KPCL HYDRO-HYDRO 90000 155159 9800
KODASALLI DPH KPCL HYDRO-HYDRO 12000 14854 19200
MUNIRA+MGH+SPH+SPH KPCL HYDRO-HYDRO 22640 48211 7900
SHARAVATHY HPS KPCL HYDRO-HYDRO 108550 276215 5400
ALMATTI DPH KPCL HYDRO-HYDRO 29000 39611 24600
VARAHI UGPH KPCL HYDRO-HYDRO 46000 71368 15600
IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 17196 15300
IDUKKI HPS KSEB HYDRO-HYDRO 78000 137905 15300
KAKKAD HPS KSEB HYDRO-HYDRO 5000 13063 15300
KALLADA HPS KSEB HYDRO-HYDRO 1500 4436 15300
KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 46544 15300
KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 635 15300
LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 30822 15300
MALANKARA HPS KSEB HYDRO-HYDRO 1050 2474 15300
MATTUPETTY KSEB HYDRO-HYDRO 200 230 15300
MALAMPUZHA KSEB HYDRO-HYDRO 250 063 15300
CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 864 15300
URUMI ST I amp II KSEB HYDRO-HYDRO 615 903 15300
LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 248 15300
NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7765 19625 15300
PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 16601 15300
PANNIAR HPS KSEB HYDRO-HYDRO 3240 6217 15300
PORINGALKUTHU KSEB HYDRO-HYDRO 3600 10052 15300
PORINGALKUTHU LBE KSEB HYDRO-HYDRO 1600 9438 15300
PEPPARA KSEB HYDRO-HYDRO 300 395 15300
POOZHITHODE KSEB HYDRO-HYDRO 480 1045 15300
Page 38
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) PEECHI KSEB HYDRO-HYDRO 125 040 15300
RANI-PERUNADU KSEB HYDRO-HYDRO 400 585 15300
SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 79783 15300
SENGULAM HPS KSEB HYDRO-HYDRO 5120 11558 15300
SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 16711 15300
VILANGAD KSEB HYDRO-HYDRO 750 1578 15300
BARAPOLE KSEB HYDRO-HYDRO 1500 1932 15300
VELLATHOOVAL KSEB HYDRO-HYDRO 360 305 15300
CHIM0NY KSEB HYDRO-HYDRO 250 156 15300
ADYANPARA KSEB HYDRO-HYDRO 350 501 15300
BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 554 15300
KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 3801 15300
KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 23132 32800
ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 14416 62280
METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 523970 62280
METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 321270 62280
NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 336575 62280
NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 591240 62280
TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 508966 62280
KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 30897 62280
VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 18720 90699 62280
KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 33593 62280
BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 1047 62280
PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 1250 62280
PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 330 62280
MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 4897 62280
MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 032 62280
KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15681 62280
KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 40608 62280
KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 21342 62280
KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 4717 62280
KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4322 62280
KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2399 62280
METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 4416 62280
METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 8035 62280
BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2187 62280
BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2359 62280
BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2511 62280
BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 1949 62280
BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 1819 62280
POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 172 62280
SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 241 62280
MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 026 62280
THIRUMOORTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 136 62280
PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 9309 62280
VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 353 62280
SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 4192 62280
PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 6571 62280
SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 1186 62280
SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6319 62280
ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 6122 62280
KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 28674 62280
SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 18381 62280
SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 4258 62280
KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 12680 62280
KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4201 62280
ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 000 62280
PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 19175 62280
AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 078 62280
BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 504 62280
BHAVANI KATTALAI (BKB)(IIIampIII BB I amp II)TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 5847 62280
PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 000 62280
Page 39
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) SRI DAMODARAM STPS APPDCL THERMAL-COAL 160000 808108 36300
PRIVATE SECTOR
KARUPPUR TANJORE LANCO TANJORE PCL THERMAL-GAS 12000 48096 28770
SIMHAPURI ENERGY LTD SIMHAPURI ENERGY LTD THERMAL-COAL 60000 143900 39100
JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 7111 45500
SBU 1 JSW ENERGY LTD
VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 26000 159100
43300
SBU 2 JSW ENERGY LTD
VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 60000 247900
42800
LANCO KPLLANCO KONDAPALLI POWER
LTDTHERMAL-GAS 36814 85060
25776
LANCO KPL STG -IILANCO KONDAPALLI POWER
LTDTHERMAL-GAS 36600 12979
46330
LANCO KPL STG -IIIALANCO KONDAPALLI POWER
LTDTHERMAL-GAS 37100 85710
46330
LANCO KPL STG -III BLANCO KONDAPALLI POWER
LTDTHERMAL-GAS 37100 43639
46330
HINDUJA NATIONAL PCL HINDUJA NATIONAL PCL THERMAL-COAL 104000 303000 38200
MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 121164 49940
UDUPI POWER COR LTD ADANI POWER LTD THERMAL-COAL 120000 754613 42500
SPECTRUM POWER GENERATION
LTD SPECTRUM PG LTD THERMAL-GASN 20525 9256812
34952
TAQA NEYVELI POWER COM PVT
LTD TAQA NEYVELI THERMAL-LIG 25000 5840
34500
ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 251000 51000
ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 207860 36800
GMR VEMAGIRI POWER GENERATION
LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 30117
46450
EASTERN REGION
CENTRAL SECTOR
MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 64675 53113
MTPS STAGE - II KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 39000 1432 69138
BOKARO `B` TPS DVC THERMAL-COAL 63000 145670 31539
MEJIA TPS U 1-3 DVC THERMAL-COAL 63000 348298 31552
MEJIA TPS U 4 DVC THERMAL-COAL 21000 116099 34997
MEJIA TPS U 5-6 DVC THERMAL-COAL 50000 276427 35976
MEJIA TPS U 7-8 DVC THERMAL-COAL 100000 552854 36991
DURGAPUR STEEL TPS DVC THERMAL-COAL 100000 665550 39323
DURGAPUR TPS DVC THERMAL-COAL 21000 59270 35416
RAGHUNATHPUR TPS DVC THERMAL-COAL 120000 201650 35326
MAITHON HYDEL STA DVC HYDRO-HYDRO 6320 12200 17984
CHANDRAPURA TPSU1-3 DVC THERMAL-COAL 42000 257610 35095
CHANDRAPURA TPSU7-8 DVC THERMAL-COAL 50000 306673 34987
KODERMA TPS DVC THERMAL-COAL 100000 380180 38131
PANCHET HPS DVC HYDRO-HYDRO 8000 13360 17984
TILLAYA HPS DVC HYDRO-HYDRO 400 1410 17984
RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34700 35400
TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 277300 23200
TLDP -III NHPC LTD HYDRO-HYDRO 13200 55400 62000
TLDP -IV NHPC LTD HYDRO-HYDRO 16000 60300 25600
FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 957219 33700
FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 308943 41000
BONGAINGAON TPS NTPC LTD THERMAL-COAL 25000 153663 58600
KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 542277 34200
KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 942591 34200
BARH-II NTPC LTD THERMAL-COAL 132000 728021 44500
TALCHER TPS NTPC LTD THERMAL-COAL 46000 335521 30100
TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 702319 25600
TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1436521 24700
STATE SECTOR
BTPS(RampM) BIHAR STATE PGCL THERMAL-COAL 22000 12142 39700
BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 98331 10602
HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 50593 9482
CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 19689 2605
RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 53192 6033
UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 147208 14637
Page 40
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 60353 4519
IB TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 288567 25000
J P H GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 210 038 61100
MEYONG CHU GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 400 1086 61100
TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 122667 38200
DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 214339 43321
KOLAGHAT THERMAL POWER
STATION
WEST BENGAL PDCL THERMAL-COAL 126000 538269 31603
BAKRESHWAR THERMAL POWER
PLANT
WEST BENGAL PDCL THERMAL-COAL 105000 634876 32154
BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 45000 166855 33299
SANTHALDIH THERMAL POWER
STATION
WEST BENGAL PDCL THERMAL-COAL 50000 336442 34932
SAGARDIGHI THERMAL POWER
PROJECT
WEST BENGAL PDCL THERMAL-COAL 160000 423121 34705
JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 20344 68900
RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 24559 68900
TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 4623 68900
PURULIA PUMPED STORAGE
PROJECT
WEST BENGAL SEDCL HYDRO-HYDRO 90000 108816 68900
MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2768 68900
PRIVATE SECTOR
CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 49474 20230
CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 555500 70200
HALDIA ENERGY HALDIA ENERGY LTD THERMAL-COAL 60000 371000 50400
DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3688 63400
KAMALANGA TPS GMR KAMALANGA ENERGY LTD THERMAL-COAL 105000547670
33300
ADHUNIK POWER U-1 ADHUNIK POWER THERMAL-COAL 27000 158 44060
ADHUNIK POWER U-2 ADHUNIK POWER THERMAL-COAL 27000 168 44250
VL-JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 332800 23622
JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 43000 45250
JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 71700 37030
JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 70700 35920
JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 71100 38870
JOJOBERA UNIT 5 TATA POWER COM LTD THERMAL-COAL 12000 79300 44560
JOJOBERA UNIT 6 TATA POWER COM LTD THERMAL-WHR 12000 83700 12840
IEL KALINGANAGAR U-I TATA POWER COM LTD THERMAL-WG 6750 33400 22500
IEL KALINGANAGAR U-II TATA POWER COM LTD THERMAL-WG 6750 34800 22500
MAITHON UNIT 1 amp 2 TATA POWER COM LTD THERMAL-COAL 105000 678000 36100
HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 27500 24340
HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 28400 24340
HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 15800 24310
NORTH EASTERN REGION
CENTRAL SECTOR
LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 74100 36600
AGARTALA GT NEEPCO THERMAL-GAS 13500 88611 27210
ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 153111 32310
DOYANG HEP NEEPCO HYDRO-HYDRO 7500 25598 49801
KOPILI HEP NEEPCO HYDRO-HYDRO 20000 98186 11491
KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 19582 20237
KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 10310 17968
RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 124093 22945
TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 10100 17344 39000
STATE SECTOR
HYDRO POWER (122 Stns) ITANAGAR GOVT OF ARUNACHAL
PRADESHHYDRO-HYDRO 6971 6217270
24600
KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39514 17337
LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 82327 36810
NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 33318 48290
MYNTRIANG SHEP ST II ASSAM POWER GENCO HYDRO-HYDRO 300 567 35776
LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 9130 49200
LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 012 49200
DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 022 49200
TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 000 49200
UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 4990 16000
UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 6476 37000
UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 16494 14600
UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 3600 9556 15000
SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 758 8000
MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44070 44800
KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 154 41400
TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 091 41400
MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 411 41400
MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 394 41400
KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 760 41400
SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 3264 41400
LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 044 41400
BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 18953 28000
ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 43585 28200
GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 4080 11100
Note
LIG Lignite N Naptha WHR Waste Heat Recovery
Page 41
Progress of Transmission Sector in the Country up to April 2019
1 TRANSMISSION LINES (All fig in CKM)
At the end of
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
Ce
ntr
al
Sta
te
JV
Pri
va
te
To
tal
6th plan 0 0 0 0 0 0 0 0 0 0 0 0 1831 4198 0 6029 1641 44364 0 46005 3472 48562 0 52034
7th plan 0 0 0 0 0 0 0 0 0 0 0 0 13068 6756 0 19824 4560 55071 0 59631 17628 61827 0 79455
8th plan 0 0 0 0 1634 0 0 1634 0 0 0 0 23001 13141 0 36142 6564 73036 0 79600 31199 86177 0 117376
9th plan 0 0 0 0 3234 1504 0 4738 751 409 0 1160 29345 20033 0 49378 8687 88306 0 96993 42017 110252 0 152269
10th plan 0 0 0 0 4368 1504 0 5872 1775 409 0 2184 48708 24730 0 73438 9444 105185 0 114629 64295 131828 0 196123
11th Plan 0 0 0 0 5948 1504 1980 9432 4839 411 0 5250 71023 30191 5605 106819 10140 125010 830 135980 91950 157116 8415 257481
12th Plan 6124 0 0 6124 5948 1504 1980 9432 25465 1177 4598 31240 92482 48240 17065 157787 11014 151276 978 163268 141033 202197 24621 367851
13th Plan (Up
to Mar2019)6124 0 0 6124 5948 1504 1980 9432 33692 1512 6605 41809 101335 58238 21173 180746 11734 162552 1010 175296 158833 223806 30768 413407
13th Plan (Up
to Apr-19)6124 0 0 6124 5948 1504 1980 9432 33745 1512 6605 41862 101335 58258 21173 180766 11734 162953 1010 175697 158886 224227 30768 413881
27150 600 MW of 132 kV Inter-Regional power transmission capacity links which are operated radially from time to time is not added in the total
75050
47900
24000
99050
30
Grand Total
Note - The figure upto the end of 10th plan in for stringing progress including the lines not commissioned Now only commissioned lines are reckoned Accordingly the figure for 10th plan (end) may read
as 187555 after adjusting with (-) 10852 Ckm
Inter-regional Power Transfer Capacity (MW)
plusmn 800 kV HVDC plusmn 500 kV HVDC 765 kV 400 kV 220 kV
IR addition in 12th
Plan (up to March
2017)
Inter-regional
Transmission
Capacity at the end
of Plan Period 2017-
22 (as on April19)
IR at the end of 11th
PlanIR at the end of 12th
Plan
IR Capacity Addition
at the end of Plan
Period 2017-22 (Till
April 19)
2004-05 27800
2005-06 28100
2006-07 30200
2007-08 33000
2008-09 35500
2009-10 36700
2010-11 38700
2011-12 41756
2012-13 45460
2013-14 48940
2014-15 53040
2015-16 54590
2016-17 57430
2017-18 60800
2018-19 62890
Year
2005-06
2006-07
2007-08
2008-09
2009-10
2010-11
2011-12
2012-13
2013-14
2014-15
2015-16
2016-17
2017-18
2018-19
2004-05 254 209 7568
2005-06 260 221 7636
2006-07 276 227 7423
2007-08 293 239 7727
2008-09 340 263 8713
2009-10 355 268 8870
2010-11 398 303 11975
2011-12 455 330 13514
2012-13 501 376 14867
2013-14 518 175
2014-15 520
Source- PFC Reports on the performance of State Power Utilities 31
1181
7335
7786
91441
8188
88363
957
1010
1075
1122
1149
(GrossGen+ Net Import) Mid-year population Provisional
5 Average cost of power supply amp average realization ( paiseKWH )
Yearcost of supply
(paiseunit)
Realization(paiseunit)
Including AgricultureOnly
Agriculture
6719
7171
3 All India yearly Coal Consumption for Power Generation (Utilities)
YEARCoal Consumption
Million Tonnes
4 All India Annual per Capita consumption of Electricity Since 2006
Per Capita Consumption ( kWh)
6314
Sl
NoExecuting Agency
Installed
Capacity (MW)Cost (Rs crore)
Date of
Clearance
32
Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as
Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received
from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made
available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified
villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is
independent of the earlier published reports
No Hydro Electric Project has been issued concurrenceAppraisal letter by CEA during April 2019
7 Status of Hydro Schemes Cleared by the CEA in Apr-2019
Name of Scheme
1999-002000-01
297594
010408 to 310309010409 to 310310
10th Plan
2005-062006-07
322968331020
6 Growth Of Rural Electrification amp Pumpsets Energisation
Plan Year
9th Plan2002-03
134092626
4111
Pump Sets Energised Villages Electricfied (Nos)
2001-02
284064367244
1218
27801997-981998-99
3207
482864
12632
1576036
4451722594
15455554
2314176
397343611750
2093311060316074
65109527813884
46708
18423975
499150
2003-042004-05
5743
9769
Cumu upto End of 10th Plan
010407 to 310308
010410 to 310311557976840909
010411 to 310312
412667
86293726
No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification
since 2004-05
65291374575 296361511th Plan
Cumu upto End of 11th Plan
596556 21212860
557439Cummulative up to end of 12th Plan
SN Contents Page
1 Rate of sale of power for the year 2016-17 33-41
RATE OF SALE OF POWER FOR THE YEAR 2016-17
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) NORTHERN REGION
CENTRAL SECTOR
BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 18000 66900 19800
CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 54000 222400 21600
CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 30000 144400 19600
CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 23100 91700 42600
PARBATI - III HPS NHPC LTD HYDRO-HYDRO 52000 68200 54800
DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 28000 95600 30000
CHUTAK NHPC LTD HYDRO-HYDRO 4400 22000 79800
DULHASTI HPS NHPC LTD HYDRO-HYDRO 39000 228000 56400
SALAL HPS NHPC LTD HYDRO-HYDRO 69000 342300 11000
TANAKPUR HPS NHPC LTD HYDRO-HYDRO 9420 43000 29600
URI HPS -I NHPC LTD HYDRO-HYDRO 48000 280300 16000
URI HPS - II NHPC LTD HYDRO-HYDRO 24000 147300 48600
NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 4500 24600 88200
SEWA - II NHPC LTD HYDRO-HYDRO 12000 47100 43400
ANTA CCPP NTPC LTD THERMAL-GASN 41930 67539 32400
AURAIYA CCPP NTPC LTD THERMAL-GASN 66336 53501 39100
BADARPUR TPS NTPC LTD THERMAL-COAL 70500 159153 44800
DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 84000 296170 42300
DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 98000 526686 46300
DADRI CCPP NTPC LTD THERMAL-GASHSD 82978 227469 33000
FARIDABAD CCPP NTPC LTD THERMAL-GASN 43159 115577 30800
RIHAND STPS I NTPC LTD THERMAL-COAL 100000 596766 24500
RIHAND STPS II NTPC LTD THERMAL-COAL 100000 737069 24600
RIHAND STPS III NTPC LTD THERMAL-COAL 100000 706546 30600
SINGRAULI STPS NTPC LTD THERMAL-COAL 200000 1394068 20400
TANDA TPS NTPC LTD THERMAL-COAL 44000 295438 40800
UNCHAHAR TPS I NTPC LTD THERMAL-COAL 42000 256454 39800
UNCHAHAR TPS II NTPC LTD THERMAL-COAL 42000 273577 38900
UNCHAHAR TPS III NTPC LTD THERMAL-COAL 21000 142780 43000
KOLDAM NTPC LTD HYDRO-HYDRO 80000 363260 43600
NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 303575 25841
RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 108000 668677 35374
NJHPS SJVNL HYDRO-HYDRO 150000 699496 23820
RAMPUR HPS SJVNL HYDRO-HYDRO 41202 195982 32260
TEHRI HPP THDC HYDRO-HYDRO 100000 272543 51800
KOTESHWAR HEP THDC HYDRO-HYDRO 40000 106244 53400
IGSTPS JHAJJAR ARAVALI P CPL THERMAL-COAL 150000 510429 49490
NEYVELI BARSINGSAR NEYVELI LIG CORP LTD THERMAL-LIG 25000 127520 38040
STATE SECTOR
PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 21000 14222 48200
PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 21000 19205 48400
PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 25000 102257 42600
PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 25000 62107 41800
DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 60000 312213 41000
RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 120000 35767442200
WYC HYDEL STATION HPGCL HYDRO-HYDRO 6240 20365 24900
GIRI POWER HOUSE HPSEB HYDRO-HYDRO 6000 13958 7600
ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 1695 5467 11900
BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 12000 18528 6700
GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 2250 7462 22500
BASSI POWER HOUSE HPSEB HYDRO-HYDRO 6600 29649 7500
BINWA POWER HOUSE HPSEB HYDRO-HYDRO 600 2749 19300
ANNEXURE-I
RATE OF SALE OF POWER FOR THE YEAR 2016-2017
Page 33
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) GAJ POWER HOUSE HPSEB HYDRO-HYDRO 1050 2914 26700
BANER POWER HOUSE HPSEB HYDRO-HYDRO 1200 2864 16200
HOLI POWER HOUSE HPSEB HYDRO-HYDRO 300 616 22500
THIROT POWER HOUSE HPSEB HYDRO-HYDRO 450 1126 22500
KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 1200 3064 22500
LARJI POWER HOUSE HPSEB HYDRO-HYDRO 12600 53677 23700
NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 250 750 31000
CHABA POWER HOUSE HPSEB HYDRO-HYDRO 175 465 23300
RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 150 101 13400
SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 200 000 22500
KILLAR HPSEB HYDRO-HYDRO 030 050 22500
BHABA AUGUMENP H HPSEB HYDRO-HYDRO 450 1276 22500
BS CHAMBA HPSEB HYDRO-HYDRO 045 099 19500
GUMMA HPSEB HYDRO-HYDRO 300 423 22500
GAS TURBINE POWER STATION IPGCL THERMAL-GAS 27000 67233 39300
PPS-I PPCL THERMAL-GAS 33000 175905 38300
PPS-III PPCL THERMAL-GAS 137120 196879 36100
LOWER JHELUM JampKPDD HYDRO-HYDRO 10500 60214 5100
UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 2260 10514 6300
UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 10500 44202 8500
GANDHARBAL JampKPDD HYDRO-HYDRO 1500 8925 4700
KARNAH MPH JampKPDD HYDRO-HYDRO 200 1122 31000
CHENANI I JampKPDD HYDRO-HYDRO 2330 10892 6600
CHENANI II JampKPDD HYDRO-HYDRO 200 1188 9300
CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 750 3634 14200
IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 375 2108 18500
IGO MERCHELLONG JampKPDD HYDRO-HYDRO 300 1572 29700
PAHALGAM MHP JampKPDD HYDRO-HYDRO 450 1713 32900
MARPACHOO JampKPDD HYDRO-HYDRO 075 375 29800
HAFTAL JampKPDD HYDRO-HYDRO 100 483 28700
SANJAK JampKPDD HYDRO-HYDRO 126 441 36000
SEWA-III JampKPDD HYDRO-HYDRO 900 3273 20200
BHADERWAH JampKPDD HYDRO-HYDRO 150 935 8900
BAZGO JampKPDD HYDRO-HYDRO 030 108 33300
SUMOOR JampKPDD HYDRO-HYDRO 010 045 35400
HUNDER JampKPDD HYDRO-HYDRO 040 176 26200
STAKNA JampKPDD HYDRO-HYDRO 400 1933 4100
KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 124000 662879 31360
SURATGARH TPS RRVUNL THERMAL-COAL 150000 402328 41730
CHHABRA TPS 1amp 2 RRVUNL THERMAL-COAL 50000 305946 36700
CHHABRA TPS 3 RRVUNL THERMAL-COAL 25000 151536 36700
CHHABRA TPS 4 RRVUNL THERMAL-COAL 25000 155896 36700
RAMGARH GT POWER PROJECT RRVUNL THERMAL-COAL 22050 43177 41800
RAMGARH GAS T P PROJECT 3 RRVUNL THERMAL-GAS 5000 93615 41800
DHOLPUR C C POWER PROJECT RRVUNL THERMAL-R-LNG 33000 9486 46110
MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 14000 20855 34192
MINI MICRO HYDEL (MMH) P S RRVUNL HYDRO-HYDRO 2385 851 37800
KALISINDH TPP 1 RRVUNL THERMAL-COAL 60000 341543 45000
KALISINDH TPP 2 RRVUNL THERMAL-COAL 60000 211588 45000
KHARA HEP UPJVNL HYDRO-HYDRO 7200 26654 7200
MATATILLA HEP UPJVNL HYDRO-HYDRO 3060 12219 6500
OBRA HEP UPJVNL HYDRO-HYDRO 9900 21517 6300
RIHAND UPJVNL HYDRO-HYDRO 30000 57369 5500
ANPARA A TPS UPRVUNL THERMAL-COAL 63000 317536 27000
ANPARA B TPS UPRVUNL THERMAL-COAL 100000 705605 22700
ANPARA D UPRVUNL THERMAL-COAL 100000 300158 39800
HARDUAGANJ TPS UPRVUNL THERMAL-COAL 16500 45817 49200
HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 50000 304389 46600
OBRA A TPS UPRVUNL THERMAL-COAL 28800 13158 34000
OBRA B TPS UPRVUNL THERMAL-COAL 100000 328124 21900
Page 34
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) PANKI TPS UPRVUNL THERMAL-COAL 21000 66488 50300
PARICHHA TPS UPRVUNL THERMAL-COAL 22000 38762 49400
PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 42000 231931 45600
PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 50000 276722 50400
CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 24000 70845 8290
CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 14400 75366 8390
DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 3375 9595 12080
DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 5100 18701 10520
KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4140 17359 12330
KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 12000 33001 9420
KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 3000 11953 8320
TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 9000 33983 12460
MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 30400 124510 16110
RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 19800 17897 10550
MPUR UTTARAKHAND JVNL HYDRO-HYDRO 930 5121 19200
PATHRI UTTARAKHAND JVNL HYDRO-HYDRO 2040 11636 14200
GALOGI UTTARAKHAND JVNL HYDRO-HYDRO 300 648 12500
PRIVATE SECTOR
MGTPP CLP INDIA PVT LTD THERMAL-COAL 132000 268902 41940
SHRINAGAR HEP ALAKNANDA HPCL HYDRO-HYDRO 33000 127414 48800
GAMA INFRAPROP CCPP GAMA INFRAPROP PVT THERMAL-GAS 22500 52686 47000
PPGCL (BARA) JP POWER VENTURES LTD THERMAL-COAL 198000 448200 38500
MALANA HEP MALANA PCL HYDRO-HYDRO 8600 26354 29792
MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 10000 30369 32580
ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 19200 56347 36079
KASHANG HEP H P PCL HYDRO-HYDRO 19500 5034 29200
BASPA-II HEP HBPCL HYDRO-HYDRO 30000 132769 13600
KARCHAM WANGTOO HEP HBPCL HYDRO-HYDRO 100000 434386 36600
RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 108000 582600 43700
RITHALA COMBI CY POWER PLANT TATA POWER DDL THERMAL-GAS 9480 000 11900
RAJPURA TPS NABHA POWER LTD THERMAL-GAS 140000 901484 39000
TALWANDI SABO POWER LTD TALWANDI SABO POWER LTD THERMAL-COAL 198000 636040 49548
ROJA THERMAL POWER STATION ROJA POWER SCL THERMAL-COAL 120000 727200 43400
KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 34400 63400
BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 36000 62600
MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 38200 60800
UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 37900 61500
KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 42300 58800
LALITPUR PGCL BAJAJ ENERGY PVT LTD THERMAL-COAL 198000 359400 47300
PRAYAGRAJ PGCL PRAYAGRAJ PGCL THERMAL-COAL 132000 448200 38595
KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 132000 783182 33438
WESTERN REGION
CENTRAL SECTOR
INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 100000 325333 23892
OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 52000 141663 34001
GANDHAR CCPP NTPC LTD THERMAL-GAS 65739 221924 28700
KAWAS CCPP NTPC LTD THERMAL-GASN 65620 167929 27000
KORBA I amp II NTPC LTD THERMAL-COAL 210000 1499171 20500
KORBA III NTPC LTD THERMAL-COAL 50000 358746 26600
SIPAT STPS I NTPC LTD THERMAL-COAL 198000 1479902 26800
SIPAT STPS II NTPC LTD THERMAL-COAL 100000 766549 26500
VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 126000 693142 25800
VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 100000 608781 23800
VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 100000 673475 27600
VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 100000 655924 32900
VINDHYACHAL STPS V NTPC LTD THERMAL-COAL 50000 328265 31700
MOUDA I NTPC LTD THERMAL-COAL 100000 343130 44500
MOUDA Ii NTPC LTD THERMAL-COAL 66000 40637 39900
RATNAGIRI GAS amp POWER PVT LTD RGPPL THERMAL-GAS 196708 442485 47000
KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 000 24729
TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 32000 201227 10740
Page 35
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 365122 19069
TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 787444 29324
STATE SECTOR
GSEG-HAZIRA15610 MW GUJARAT S ENEGEN LTD THERMAL-GAS 15610 1805 28200
GSEG-HAZIRA35143 MW GUJARAT S ENEGEN LTD THERMAL-GAS 35130 22276 51300
GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 21978 51800
AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 13929 26100
KORBA TPS EAST CSPGCL THERMAL-COAL 44000 198673 33880
DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 365808 27570
KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 316500 30420
HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 532878 19410
CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 515 58300
MTTPS CHAMPA U-I CSPGCL THERMAL-COAL 50000 220376 39000
MTTPS CHAMPA U-II CSPGCL THERMAL-COAL 50000 23709 10000
SHP GANGREL CSPGCL HYDRO-HYDRO 1000 2350 36790
BANGO HEP CSPGCL HYDRO-HYDRO 12000 14662 8900
MHP KORBA WEST CSPGCL HYDRO-HYDRO 170 859 38190
SIKASAR HEP CSPGCL HYDRO-HYDRO 700 418 26870
DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8843 74500
DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 19446 51500
GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 66388 71600
GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127488 41300
KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 96072 43900
KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 29841 56400
SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 184966 58800
UKAI 1-5 GSECL THERMAL-COAL 85000 204891 46900
UKAI TPS 6 GSECL THERMAL-COAL 50000 284448 48200
WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 271999 58300
WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 82808 44100
KADANA HPS GSECL HYDRO-HYDRO 24200 34433 16800
UKAI HPS GSECL HYDRO-HYDRO 30500 40585 6100
TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 123000 11500
BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 8900 10900
BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 7200 27500
JHINNA HPS MPPGCL HYDRO-HYDRO 2000 9700 18500
RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 44300 3400
GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 17300 4600
SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 4100 16900
MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 14600 27000
PENCH HPS MPPGCL HYDRO-HYDRO 16000 23700 8100
RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 3000 16900
AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 134400 35100
SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 283800 38700
SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 344600 34300
SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 111600 61600
SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 211800 58000
SSTPS PH-I MPPGCL THERMAL-COAL 120000 233100 84300
BHUSAWAL TPS MSPGCL THERMAL-COAL 142000 566258 51100
CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1365682 33700
KHAPERKHEDA MSPGCL THERMAL-COAL 134000 706207 39100
KORADI TPS MSPGCL THERMAL-COAL 62000 443206 42000
NASIK TPS MSPGCL THERMAL-COAL 63000 297275 47000
PARLI TPS MSPGCL THERMAL-COAL 113000 175934 71600
PARAS MSPGCL THERMAL-COAL 50000 267931 38700
URAN CCPP MSPGCL THERMAL-GAS 67200 320330 30600
KOYANA MSPGCL HYDRO-HYDRO 195600 328155 13100
SMALL HYDRO POWER PLANTS MSPGCL HYDRO-HYDRO 45400 93062 30500
BHIRA MSPGCL HYDRO-HYDRO 8000 10046 8400
TILLARI MSPGCL HYDRO-HYDRO 8900 10584 3100
SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 233298 20500
SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 87633 20500
PRIVATE SECTOR
Page 36
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 81282 46750
JNSTPP(JAYPEE NIGRIE) JP POWER VENTURES LTD THERMAL-COAL 132000 726695 29310
MB POWER MB POWER THERMAL-COAL 120000 345632 38310
ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 754922 28671
ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 780761 23495
ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 198000 1263784 32090
ADANI POWER MAHARA ADANI POWER LTD THERMAL-COAL 330000 1666191 34124
AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 170065 36827
SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 252035 45129
ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 458551 36000
ESSAR POWER MP LTD ESSAR POWER MP LTD THERMAL-COAL 60000 243040 28600
VEDANTA LTD (P P -I) VEDANTA LTD THERMAL-GAS 3000 15044 24000
VEDANTA LTD (P P -II) VEDANTA LTD THERMAL-GAS 3000 21293 24000
PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 8234600 24000
165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 5850 64390
145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 68717 40349
SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 132655 28776
SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 144686 38567
MUNDRA UMPPCOASTAL GUJARAT POWER
LTD THERMAL-IMP COAL 400000 2530300
23900
LANCO AMARKANTAK TPP PATHADIH
U-ILANCO AMARKAN POWER LTD THERMAL-COAL 30000 195500
29200
LANCO AMARKANTAK TPP PATHADIH
U-IILANCO AMARKAN POWER LTD THERMAL-COAL 30000 206900
27600
BARADARHA TPS D B POWER LTD THERMAL-COAL 120000 677373 29200
JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 405000 28900
JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 453000 40500
DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 339437 40700
TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 293400 44000
TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 137200 37000
TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 174900 44000
BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 92900 14100
BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23700 34300
KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 27600 48300
CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2530300 23900
BHANDARDRA HEP -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 2475 54900
SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 161400 26500
SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 445000 39000
SOTHERN REGION
CENTRAL SECTOR
NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 325699 54820
NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 305532 39880
NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 998805 38510
NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 113016 54070
NEYVELI TAMILNADU POWER LTD JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 625274 42200
VALLUR TPS NTPC TECL THERMAL-COAL 150000 856438 42350
R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 1493 84300
RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1502919 29400
RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 341291 31800
SIMHADRI I NTPC LTD THERMAL-COAL 100000 688382 36800
SIMHADRI II NTPC LTD THERMAL-COAL 100000 663657 43400
KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 593110 31324
MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 291625 21764
KKNPP-1 amp 2 NPCIL NUCLEAR-NUCLEAR 200000 572609 40948
MINICOY LAKSHADEEP THERMAL-DIESEL 340 770 29600
KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1097 29600
AMINI LAKSHADEEP THERMAL-DIESEL 265 509 29600
ANDROTT LAKSHADEEP THERMAL-DIESEL 219 524 29600
KALPENI LAKSHADEEP THERMAL-DIESEL 175 356 29600
AGATTI LAKSHADEEP THERMAL-DIESEL 195 658 29600
KADMAT LAKSHADEEP THERMAL-DIESEL 190 414 29600
KILTAN LAKSHADEEP THERMAL-DIESEL 150 269 29600
CHETLET LAKSHADEEP THERMAL-DIESEL 100 139 29600
BITRA LAKSHADEEP THERMAL-DIESEL 043 024 29600
BANGARAM LAKSHADEEP THERMAL-DIESEL 018 009 29600
Page 37
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) STATE SECTOR
Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 721811 46500
Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 50000 336142 46500
RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 237358 46500
RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 239926 46500
RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 124500 46500
SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 62109 46500
UPPER SILERU APGENCO HYDRO-HYDRO 24000 33000 46500
LOWER SILERU APGENCO HYDRO-HYDRO 46000 81066 46500
DONKARAI APGENCO HYDRO-HYDRO 2500 6007 46500
PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 1262 46500
CHETTIPETA APGENCO HYDRO-HYDRO 100 214 46500
MUCHKUND APGENCO HYDRO-HYDRO 12000 37571 46500
NAGARJUNASAGAR RCPH APGENCO HYDRO-HYDRO 9000 606 46500
TUNGABHADRA HES amp HAMPI(AP
Share)
APGENCO HYDRO-HYDRO 7200 6100 46500
KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 352232 42600
KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 288131 32500
KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 319272 46500
RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 40073 44300
KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 308317 46000
KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 308963 51300
SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 61004 76600
NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 17960 75300
PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 20873 58300
POCHAMPAD-I TSPGENCO HYDRO-HYDRO 2700 5455 29800
POCHAMPAD-II TSPGENCO HYDRO-HYDRO 900 1932 40700
NIZAMSAGAR TSPGENCO HYDRO-HYDRO 1000 1126 53400
RAICHUR TPS 1 to 7 KPCL THERMAL-COAL 147000 890866 43800
RAICHUR TPS 8 KPCL THERMAL-COAL 25000 159523 48200
BELLARI TPS 1 KPCL THERMAL-COAL 50000 318679 51100
BELLARI TPS 2 KPCL THERMAL-COAL 50000 232347 55600
BELLARI TPS 3 KPCL THERMAL-COAL 70000 47565 34400
BHADRA PH KPCL HYDRO-HYDRO 3920 2369 45900
GERUSUPPA PH KPCL HYDRO-HYDRO 24000 26990 22000
GHAT PRABHA HEP KPCL HYDRO-HYDRO 3200 4777 25300
KADRA HPS KPCL HYDRO-HYDRO 15000 16889 26800
NAGJHARI KPCL HYDRO-HYDRO 90000 155159 9800
KODASALLI DPH KPCL HYDRO-HYDRO 12000 14854 19200
MUNIRA+MGH+SPH+SPH KPCL HYDRO-HYDRO 22640 48211 7900
SHARAVATHY HPS KPCL HYDRO-HYDRO 108550 276215 5400
ALMATTI DPH KPCL HYDRO-HYDRO 29000 39611 24600
VARAHI UGPH KPCL HYDRO-HYDRO 46000 71368 15600
IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 17196 15300
IDUKKI HPS KSEB HYDRO-HYDRO 78000 137905 15300
KAKKAD HPS KSEB HYDRO-HYDRO 5000 13063 15300
KALLADA HPS KSEB HYDRO-HYDRO 1500 4436 15300
KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 46544 15300
KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 635 15300
LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 30822 15300
MALANKARA HPS KSEB HYDRO-HYDRO 1050 2474 15300
MATTUPETTY KSEB HYDRO-HYDRO 200 230 15300
MALAMPUZHA KSEB HYDRO-HYDRO 250 063 15300
CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 864 15300
URUMI ST I amp II KSEB HYDRO-HYDRO 615 903 15300
LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 248 15300
NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7765 19625 15300
PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 16601 15300
PANNIAR HPS KSEB HYDRO-HYDRO 3240 6217 15300
PORINGALKUTHU KSEB HYDRO-HYDRO 3600 10052 15300
PORINGALKUTHU LBE KSEB HYDRO-HYDRO 1600 9438 15300
PEPPARA KSEB HYDRO-HYDRO 300 395 15300
POOZHITHODE KSEB HYDRO-HYDRO 480 1045 15300
Page 38
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) PEECHI KSEB HYDRO-HYDRO 125 040 15300
RANI-PERUNADU KSEB HYDRO-HYDRO 400 585 15300
SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 79783 15300
SENGULAM HPS KSEB HYDRO-HYDRO 5120 11558 15300
SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 16711 15300
VILANGAD KSEB HYDRO-HYDRO 750 1578 15300
BARAPOLE KSEB HYDRO-HYDRO 1500 1932 15300
VELLATHOOVAL KSEB HYDRO-HYDRO 360 305 15300
CHIM0NY KSEB HYDRO-HYDRO 250 156 15300
ADYANPARA KSEB HYDRO-HYDRO 350 501 15300
BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 554 15300
KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 3801 15300
KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 23132 32800
ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 14416 62280
METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 523970 62280
METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 321270 62280
NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 336575 62280
NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 591240 62280
TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 508966 62280
KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 30897 62280
VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 18720 90699 62280
KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 33593 62280
BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 1047 62280
PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 1250 62280
PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 330 62280
MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 4897 62280
MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 032 62280
KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15681 62280
KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 40608 62280
KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 21342 62280
KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 4717 62280
KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4322 62280
KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2399 62280
METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 4416 62280
METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 8035 62280
BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2187 62280
BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2359 62280
BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2511 62280
BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 1949 62280
BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 1819 62280
POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 172 62280
SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 241 62280
MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 026 62280
THIRUMOORTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 136 62280
PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 9309 62280
VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 353 62280
SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 4192 62280
PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 6571 62280
SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 1186 62280
SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6319 62280
ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 6122 62280
KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 28674 62280
SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 18381 62280
SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 4258 62280
KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 12680 62280
KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4201 62280
ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 000 62280
PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 19175 62280
AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 078 62280
BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 504 62280
BHAVANI KATTALAI (BKB)(IIIampIII BB I amp II)TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 5847 62280
PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 000 62280
Page 39
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) SRI DAMODARAM STPS APPDCL THERMAL-COAL 160000 808108 36300
PRIVATE SECTOR
KARUPPUR TANJORE LANCO TANJORE PCL THERMAL-GAS 12000 48096 28770
SIMHAPURI ENERGY LTD SIMHAPURI ENERGY LTD THERMAL-COAL 60000 143900 39100
JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 7111 45500
SBU 1 JSW ENERGY LTD
VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 26000 159100
43300
SBU 2 JSW ENERGY LTD
VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 60000 247900
42800
LANCO KPLLANCO KONDAPALLI POWER
LTDTHERMAL-GAS 36814 85060
25776
LANCO KPL STG -IILANCO KONDAPALLI POWER
LTDTHERMAL-GAS 36600 12979
46330
LANCO KPL STG -IIIALANCO KONDAPALLI POWER
LTDTHERMAL-GAS 37100 85710
46330
LANCO KPL STG -III BLANCO KONDAPALLI POWER
LTDTHERMAL-GAS 37100 43639
46330
HINDUJA NATIONAL PCL HINDUJA NATIONAL PCL THERMAL-COAL 104000 303000 38200
MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 121164 49940
UDUPI POWER COR LTD ADANI POWER LTD THERMAL-COAL 120000 754613 42500
SPECTRUM POWER GENERATION
LTD SPECTRUM PG LTD THERMAL-GASN 20525 9256812
34952
TAQA NEYVELI POWER COM PVT
LTD TAQA NEYVELI THERMAL-LIG 25000 5840
34500
ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 251000 51000
ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 207860 36800
GMR VEMAGIRI POWER GENERATION
LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 30117
46450
EASTERN REGION
CENTRAL SECTOR
MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 64675 53113
MTPS STAGE - II KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 39000 1432 69138
BOKARO `B` TPS DVC THERMAL-COAL 63000 145670 31539
MEJIA TPS U 1-3 DVC THERMAL-COAL 63000 348298 31552
MEJIA TPS U 4 DVC THERMAL-COAL 21000 116099 34997
MEJIA TPS U 5-6 DVC THERMAL-COAL 50000 276427 35976
MEJIA TPS U 7-8 DVC THERMAL-COAL 100000 552854 36991
DURGAPUR STEEL TPS DVC THERMAL-COAL 100000 665550 39323
DURGAPUR TPS DVC THERMAL-COAL 21000 59270 35416
RAGHUNATHPUR TPS DVC THERMAL-COAL 120000 201650 35326
MAITHON HYDEL STA DVC HYDRO-HYDRO 6320 12200 17984
CHANDRAPURA TPSU1-3 DVC THERMAL-COAL 42000 257610 35095
CHANDRAPURA TPSU7-8 DVC THERMAL-COAL 50000 306673 34987
KODERMA TPS DVC THERMAL-COAL 100000 380180 38131
PANCHET HPS DVC HYDRO-HYDRO 8000 13360 17984
TILLAYA HPS DVC HYDRO-HYDRO 400 1410 17984
RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34700 35400
TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 277300 23200
TLDP -III NHPC LTD HYDRO-HYDRO 13200 55400 62000
TLDP -IV NHPC LTD HYDRO-HYDRO 16000 60300 25600
FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 957219 33700
FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 308943 41000
BONGAINGAON TPS NTPC LTD THERMAL-COAL 25000 153663 58600
KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 542277 34200
KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 942591 34200
BARH-II NTPC LTD THERMAL-COAL 132000 728021 44500
TALCHER TPS NTPC LTD THERMAL-COAL 46000 335521 30100
TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 702319 25600
TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1436521 24700
STATE SECTOR
BTPS(RampM) BIHAR STATE PGCL THERMAL-COAL 22000 12142 39700
BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 98331 10602
HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 50593 9482
CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 19689 2605
RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 53192 6033
UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 147208 14637
Page 40
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 60353 4519
IB TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 288567 25000
J P H GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 210 038 61100
MEYONG CHU GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 400 1086 61100
TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 122667 38200
DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 214339 43321
KOLAGHAT THERMAL POWER
STATION
WEST BENGAL PDCL THERMAL-COAL 126000 538269 31603
BAKRESHWAR THERMAL POWER
PLANT
WEST BENGAL PDCL THERMAL-COAL 105000 634876 32154
BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 45000 166855 33299
SANTHALDIH THERMAL POWER
STATION
WEST BENGAL PDCL THERMAL-COAL 50000 336442 34932
SAGARDIGHI THERMAL POWER
PROJECT
WEST BENGAL PDCL THERMAL-COAL 160000 423121 34705
JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 20344 68900
RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 24559 68900
TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 4623 68900
PURULIA PUMPED STORAGE
PROJECT
WEST BENGAL SEDCL HYDRO-HYDRO 90000 108816 68900
MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2768 68900
PRIVATE SECTOR
CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 49474 20230
CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 555500 70200
HALDIA ENERGY HALDIA ENERGY LTD THERMAL-COAL 60000 371000 50400
DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3688 63400
KAMALANGA TPS GMR KAMALANGA ENERGY LTD THERMAL-COAL 105000547670
33300
ADHUNIK POWER U-1 ADHUNIK POWER THERMAL-COAL 27000 158 44060
ADHUNIK POWER U-2 ADHUNIK POWER THERMAL-COAL 27000 168 44250
VL-JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 332800 23622
JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 43000 45250
JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 71700 37030
JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 70700 35920
JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 71100 38870
JOJOBERA UNIT 5 TATA POWER COM LTD THERMAL-COAL 12000 79300 44560
JOJOBERA UNIT 6 TATA POWER COM LTD THERMAL-WHR 12000 83700 12840
IEL KALINGANAGAR U-I TATA POWER COM LTD THERMAL-WG 6750 33400 22500
IEL KALINGANAGAR U-II TATA POWER COM LTD THERMAL-WG 6750 34800 22500
MAITHON UNIT 1 amp 2 TATA POWER COM LTD THERMAL-COAL 105000 678000 36100
HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 27500 24340
HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 28400 24340
HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 15800 24310
NORTH EASTERN REGION
CENTRAL SECTOR
LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 74100 36600
AGARTALA GT NEEPCO THERMAL-GAS 13500 88611 27210
ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 153111 32310
DOYANG HEP NEEPCO HYDRO-HYDRO 7500 25598 49801
KOPILI HEP NEEPCO HYDRO-HYDRO 20000 98186 11491
KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 19582 20237
KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 10310 17968
RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 124093 22945
TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 10100 17344 39000
STATE SECTOR
HYDRO POWER (122 Stns) ITANAGAR GOVT OF ARUNACHAL
PRADESHHYDRO-HYDRO 6971 6217270
24600
KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39514 17337
LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 82327 36810
NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 33318 48290
MYNTRIANG SHEP ST II ASSAM POWER GENCO HYDRO-HYDRO 300 567 35776
LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 9130 49200
LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 012 49200
DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 022 49200
TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 000 49200
UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 4990 16000
UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 6476 37000
UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 16494 14600
UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 3600 9556 15000
SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 758 8000
MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44070 44800
KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 154 41400
TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 091 41400
MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 411 41400
MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 394 41400
KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 760 41400
SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 3264 41400
LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 044 41400
BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 18953 28000
ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 43585 28200
GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 4080 11100
Note
LIG Lignite N Naptha WHR Waste Heat Recovery
Page 41
2004-05 27800
2005-06 28100
2006-07 30200
2007-08 33000
2008-09 35500
2009-10 36700
2010-11 38700
2011-12 41756
2012-13 45460
2013-14 48940
2014-15 53040
2015-16 54590
2016-17 57430
2017-18 60800
2018-19 62890
Year
2005-06
2006-07
2007-08
2008-09
2009-10
2010-11
2011-12
2012-13
2013-14
2014-15
2015-16
2016-17
2017-18
2018-19
2004-05 254 209 7568
2005-06 260 221 7636
2006-07 276 227 7423
2007-08 293 239 7727
2008-09 340 263 8713
2009-10 355 268 8870
2010-11 398 303 11975
2011-12 455 330 13514
2012-13 501 376 14867
2013-14 518 175
2014-15 520
Source- PFC Reports on the performance of State Power Utilities 31
1181
7335
7786
91441
8188
88363
957
1010
1075
1122
1149
(GrossGen+ Net Import) Mid-year population Provisional
5 Average cost of power supply amp average realization ( paiseKWH )
Yearcost of supply
(paiseunit)
Realization(paiseunit)
Including AgricultureOnly
Agriculture
6719
7171
3 All India yearly Coal Consumption for Power Generation (Utilities)
YEARCoal Consumption
Million Tonnes
4 All India Annual per Capita consumption of Electricity Since 2006
Per Capita Consumption ( kWh)
6314
Sl
NoExecuting Agency
Installed
Capacity (MW)Cost (Rs crore)
Date of
Clearance
32
Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as
Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received
from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made
available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified
villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is
independent of the earlier published reports
No Hydro Electric Project has been issued concurrenceAppraisal letter by CEA during April 2019
7 Status of Hydro Schemes Cleared by the CEA in Apr-2019
Name of Scheme
1999-002000-01
297594
010408 to 310309010409 to 310310
10th Plan
2005-062006-07
322968331020
6 Growth Of Rural Electrification amp Pumpsets Energisation
Plan Year
9th Plan2002-03
134092626
4111
Pump Sets Energised Villages Electricfied (Nos)
2001-02
284064367244
1218
27801997-981998-99
3207
482864
12632
1576036
4451722594
15455554
2314176
397343611750
2093311060316074
65109527813884
46708
18423975
499150
2003-042004-05
5743
9769
Cumu upto End of 10th Plan
010407 to 310308
010410 to 310311557976840909
010411 to 310312
412667
86293726
No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification
since 2004-05
65291374575 296361511th Plan
Cumu upto End of 11th Plan
596556 21212860
557439Cummulative up to end of 12th Plan
SN Contents Page
1 Rate of sale of power for the year 2016-17 33-41
RATE OF SALE OF POWER FOR THE YEAR 2016-17
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) NORTHERN REGION
CENTRAL SECTOR
BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 18000 66900 19800
CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 54000 222400 21600
CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 30000 144400 19600
CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 23100 91700 42600
PARBATI - III HPS NHPC LTD HYDRO-HYDRO 52000 68200 54800
DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 28000 95600 30000
CHUTAK NHPC LTD HYDRO-HYDRO 4400 22000 79800
DULHASTI HPS NHPC LTD HYDRO-HYDRO 39000 228000 56400
SALAL HPS NHPC LTD HYDRO-HYDRO 69000 342300 11000
TANAKPUR HPS NHPC LTD HYDRO-HYDRO 9420 43000 29600
URI HPS -I NHPC LTD HYDRO-HYDRO 48000 280300 16000
URI HPS - II NHPC LTD HYDRO-HYDRO 24000 147300 48600
NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 4500 24600 88200
SEWA - II NHPC LTD HYDRO-HYDRO 12000 47100 43400
ANTA CCPP NTPC LTD THERMAL-GASN 41930 67539 32400
AURAIYA CCPP NTPC LTD THERMAL-GASN 66336 53501 39100
BADARPUR TPS NTPC LTD THERMAL-COAL 70500 159153 44800
DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 84000 296170 42300
DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 98000 526686 46300
DADRI CCPP NTPC LTD THERMAL-GASHSD 82978 227469 33000
FARIDABAD CCPP NTPC LTD THERMAL-GASN 43159 115577 30800
RIHAND STPS I NTPC LTD THERMAL-COAL 100000 596766 24500
RIHAND STPS II NTPC LTD THERMAL-COAL 100000 737069 24600
RIHAND STPS III NTPC LTD THERMAL-COAL 100000 706546 30600
SINGRAULI STPS NTPC LTD THERMAL-COAL 200000 1394068 20400
TANDA TPS NTPC LTD THERMAL-COAL 44000 295438 40800
UNCHAHAR TPS I NTPC LTD THERMAL-COAL 42000 256454 39800
UNCHAHAR TPS II NTPC LTD THERMAL-COAL 42000 273577 38900
UNCHAHAR TPS III NTPC LTD THERMAL-COAL 21000 142780 43000
KOLDAM NTPC LTD HYDRO-HYDRO 80000 363260 43600
NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 303575 25841
RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 108000 668677 35374
NJHPS SJVNL HYDRO-HYDRO 150000 699496 23820
RAMPUR HPS SJVNL HYDRO-HYDRO 41202 195982 32260
TEHRI HPP THDC HYDRO-HYDRO 100000 272543 51800
KOTESHWAR HEP THDC HYDRO-HYDRO 40000 106244 53400
IGSTPS JHAJJAR ARAVALI P CPL THERMAL-COAL 150000 510429 49490
NEYVELI BARSINGSAR NEYVELI LIG CORP LTD THERMAL-LIG 25000 127520 38040
STATE SECTOR
PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 21000 14222 48200
PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 21000 19205 48400
PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 25000 102257 42600
PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 25000 62107 41800
DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 60000 312213 41000
RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 120000 35767442200
WYC HYDEL STATION HPGCL HYDRO-HYDRO 6240 20365 24900
GIRI POWER HOUSE HPSEB HYDRO-HYDRO 6000 13958 7600
ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 1695 5467 11900
BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 12000 18528 6700
GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 2250 7462 22500
BASSI POWER HOUSE HPSEB HYDRO-HYDRO 6600 29649 7500
BINWA POWER HOUSE HPSEB HYDRO-HYDRO 600 2749 19300
ANNEXURE-I
RATE OF SALE OF POWER FOR THE YEAR 2016-2017
Page 33
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) GAJ POWER HOUSE HPSEB HYDRO-HYDRO 1050 2914 26700
BANER POWER HOUSE HPSEB HYDRO-HYDRO 1200 2864 16200
HOLI POWER HOUSE HPSEB HYDRO-HYDRO 300 616 22500
THIROT POWER HOUSE HPSEB HYDRO-HYDRO 450 1126 22500
KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 1200 3064 22500
LARJI POWER HOUSE HPSEB HYDRO-HYDRO 12600 53677 23700
NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 250 750 31000
CHABA POWER HOUSE HPSEB HYDRO-HYDRO 175 465 23300
RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 150 101 13400
SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 200 000 22500
KILLAR HPSEB HYDRO-HYDRO 030 050 22500
BHABA AUGUMENP H HPSEB HYDRO-HYDRO 450 1276 22500
BS CHAMBA HPSEB HYDRO-HYDRO 045 099 19500
GUMMA HPSEB HYDRO-HYDRO 300 423 22500
GAS TURBINE POWER STATION IPGCL THERMAL-GAS 27000 67233 39300
PPS-I PPCL THERMAL-GAS 33000 175905 38300
PPS-III PPCL THERMAL-GAS 137120 196879 36100
LOWER JHELUM JampKPDD HYDRO-HYDRO 10500 60214 5100
UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 2260 10514 6300
UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 10500 44202 8500
GANDHARBAL JampKPDD HYDRO-HYDRO 1500 8925 4700
KARNAH MPH JampKPDD HYDRO-HYDRO 200 1122 31000
CHENANI I JampKPDD HYDRO-HYDRO 2330 10892 6600
CHENANI II JampKPDD HYDRO-HYDRO 200 1188 9300
CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 750 3634 14200
IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 375 2108 18500
IGO MERCHELLONG JampKPDD HYDRO-HYDRO 300 1572 29700
PAHALGAM MHP JampKPDD HYDRO-HYDRO 450 1713 32900
MARPACHOO JampKPDD HYDRO-HYDRO 075 375 29800
HAFTAL JampKPDD HYDRO-HYDRO 100 483 28700
SANJAK JampKPDD HYDRO-HYDRO 126 441 36000
SEWA-III JampKPDD HYDRO-HYDRO 900 3273 20200
BHADERWAH JampKPDD HYDRO-HYDRO 150 935 8900
BAZGO JampKPDD HYDRO-HYDRO 030 108 33300
SUMOOR JampKPDD HYDRO-HYDRO 010 045 35400
HUNDER JampKPDD HYDRO-HYDRO 040 176 26200
STAKNA JampKPDD HYDRO-HYDRO 400 1933 4100
KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 124000 662879 31360
SURATGARH TPS RRVUNL THERMAL-COAL 150000 402328 41730
CHHABRA TPS 1amp 2 RRVUNL THERMAL-COAL 50000 305946 36700
CHHABRA TPS 3 RRVUNL THERMAL-COAL 25000 151536 36700
CHHABRA TPS 4 RRVUNL THERMAL-COAL 25000 155896 36700
RAMGARH GT POWER PROJECT RRVUNL THERMAL-COAL 22050 43177 41800
RAMGARH GAS T P PROJECT 3 RRVUNL THERMAL-GAS 5000 93615 41800
DHOLPUR C C POWER PROJECT RRVUNL THERMAL-R-LNG 33000 9486 46110
MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 14000 20855 34192
MINI MICRO HYDEL (MMH) P S RRVUNL HYDRO-HYDRO 2385 851 37800
KALISINDH TPP 1 RRVUNL THERMAL-COAL 60000 341543 45000
KALISINDH TPP 2 RRVUNL THERMAL-COAL 60000 211588 45000
KHARA HEP UPJVNL HYDRO-HYDRO 7200 26654 7200
MATATILLA HEP UPJVNL HYDRO-HYDRO 3060 12219 6500
OBRA HEP UPJVNL HYDRO-HYDRO 9900 21517 6300
RIHAND UPJVNL HYDRO-HYDRO 30000 57369 5500
ANPARA A TPS UPRVUNL THERMAL-COAL 63000 317536 27000
ANPARA B TPS UPRVUNL THERMAL-COAL 100000 705605 22700
ANPARA D UPRVUNL THERMAL-COAL 100000 300158 39800
HARDUAGANJ TPS UPRVUNL THERMAL-COAL 16500 45817 49200
HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 50000 304389 46600
OBRA A TPS UPRVUNL THERMAL-COAL 28800 13158 34000
OBRA B TPS UPRVUNL THERMAL-COAL 100000 328124 21900
Page 34
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) PANKI TPS UPRVUNL THERMAL-COAL 21000 66488 50300
PARICHHA TPS UPRVUNL THERMAL-COAL 22000 38762 49400
PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 42000 231931 45600
PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 50000 276722 50400
CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 24000 70845 8290
CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 14400 75366 8390
DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 3375 9595 12080
DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 5100 18701 10520
KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4140 17359 12330
KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 12000 33001 9420
KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 3000 11953 8320
TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 9000 33983 12460
MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 30400 124510 16110
RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 19800 17897 10550
MPUR UTTARAKHAND JVNL HYDRO-HYDRO 930 5121 19200
PATHRI UTTARAKHAND JVNL HYDRO-HYDRO 2040 11636 14200
GALOGI UTTARAKHAND JVNL HYDRO-HYDRO 300 648 12500
PRIVATE SECTOR
MGTPP CLP INDIA PVT LTD THERMAL-COAL 132000 268902 41940
SHRINAGAR HEP ALAKNANDA HPCL HYDRO-HYDRO 33000 127414 48800
GAMA INFRAPROP CCPP GAMA INFRAPROP PVT THERMAL-GAS 22500 52686 47000
PPGCL (BARA) JP POWER VENTURES LTD THERMAL-COAL 198000 448200 38500
MALANA HEP MALANA PCL HYDRO-HYDRO 8600 26354 29792
MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 10000 30369 32580
ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 19200 56347 36079
KASHANG HEP H P PCL HYDRO-HYDRO 19500 5034 29200
BASPA-II HEP HBPCL HYDRO-HYDRO 30000 132769 13600
KARCHAM WANGTOO HEP HBPCL HYDRO-HYDRO 100000 434386 36600
RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 108000 582600 43700
RITHALA COMBI CY POWER PLANT TATA POWER DDL THERMAL-GAS 9480 000 11900
RAJPURA TPS NABHA POWER LTD THERMAL-GAS 140000 901484 39000
TALWANDI SABO POWER LTD TALWANDI SABO POWER LTD THERMAL-COAL 198000 636040 49548
ROJA THERMAL POWER STATION ROJA POWER SCL THERMAL-COAL 120000 727200 43400
KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 34400 63400
BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 36000 62600
MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 38200 60800
UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 37900 61500
KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 42300 58800
LALITPUR PGCL BAJAJ ENERGY PVT LTD THERMAL-COAL 198000 359400 47300
PRAYAGRAJ PGCL PRAYAGRAJ PGCL THERMAL-COAL 132000 448200 38595
KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 132000 783182 33438
WESTERN REGION
CENTRAL SECTOR
INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 100000 325333 23892
OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 52000 141663 34001
GANDHAR CCPP NTPC LTD THERMAL-GAS 65739 221924 28700
KAWAS CCPP NTPC LTD THERMAL-GASN 65620 167929 27000
KORBA I amp II NTPC LTD THERMAL-COAL 210000 1499171 20500
KORBA III NTPC LTD THERMAL-COAL 50000 358746 26600
SIPAT STPS I NTPC LTD THERMAL-COAL 198000 1479902 26800
SIPAT STPS II NTPC LTD THERMAL-COAL 100000 766549 26500
VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 126000 693142 25800
VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 100000 608781 23800
VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 100000 673475 27600
VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 100000 655924 32900
VINDHYACHAL STPS V NTPC LTD THERMAL-COAL 50000 328265 31700
MOUDA I NTPC LTD THERMAL-COAL 100000 343130 44500
MOUDA Ii NTPC LTD THERMAL-COAL 66000 40637 39900
RATNAGIRI GAS amp POWER PVT LTD RGPPL THERMAL-GAS 196708 442485 47000
KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 000 24729
TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 32000 201227 10740
Page 35
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 365122 19069
TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 787444 29324
STATE SECTOR
GSEG-HAZIRA15610 MW GUJARAT S ENEGEN LTD THERMAL-GAS 15610 1805 28200
GSEG-HAZIRA35143 MW GUJARAT S ENEGEN LTD THERMAL-GAS 35130 22276 51300
GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 21978 51800
AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 13929 26100
KORBA TPS EAST CSPGCL THERMAL-COAL 44000 198673 33880
DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 365808 27570
KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 316500 30420
HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 532878 19410
CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 515 58300
MTTPS CHAMPA U-I CSPGCL THERMAL-COAL 50000 220376 39000
MTTPS CHAMPA U-II CSPGCL THERMAL-COAL 50000 23709 10000
SHP GANGREL CSPGCL HYDRO-HYDRO 1000 2350 36790
BANGO HEP CSPGCL HYDRO-HYDRO 12000 14662 8900
MHP KORBA WEST CSPGCL HYDRO-HYDRO 170 859 38190
SIKASAR HEP CSPGCL HYDRO-HYDRO 700 418 26870
DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8843 74500
DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 19446 51500
GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 66388 71600
GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127488 41300
KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 96072 43900
KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 29841 56400
SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 184966 58800
UKAI 1-5 GSECL THERMAL-COAL 85000 204891 46900
UKAI TPS 6 GSECL THERMAL-COAL 50000 284448 48200
WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 271999 58300
WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 82808 44100
KADANA HPS GSECL HYDRO-HYDRO 24200 34433 16800
UKAI HPS GSECL HYDRO-HYDRO 30500 40585 6100
TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 123000 11500
BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 8900 10900
BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 7200 27500
JHINNA HPS MPPGCL HYDRO-HYDRO 2000 9700 18500
RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 44300 3400
GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 17300 4600
SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 4100 16900
MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 14600 27000
PENCH HPS MPPGCL HYDRO-HYDRO 16000 23700 8100
RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 3000 16900
AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 134400 35100
SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 283800 38700
SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 344600 34300
SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 111600 61600
SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 211800 58000
SSTPS PH-I MPPGCL THERMAL-COAL 120000 233100 84300
BHUSAWAL TPS MSPGCL THERMAL-COAL 142000 566258 51100
CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1365682 33700
KHAPERKHEDA MSPGCL THERMAL-COAL 134000 706207 39100
KORADI TPS MSPGCL THERMAL-COAL 62000 443206 42000
NASIK TPS MSPGCL THERMAL-COAL 63000 297275 47000
PARLI TPS MSPGCL THERMAL-COAL 113000 175934 71600
PARAS MSPGCL THERMAL-COAL 50000 267931 38700
URAN CCPP MSPGCL THERMAL-GAS 67200 320330 30600
KOYANA MSPGCL HYDRO-HYDRO 195600 328155 13100
SMALL HYDRO POWER PLANTS MSPGCL HYDRO-HYDRO 45400 93062 30500
BHIRA MSPGCL HYDRO-HYDRO 8000 10046 8400
TILLARI MSPGCL HYDRO-HYDRO 8900 10584 3100
SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 233298 20500
SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 87633 20500
PRIVATE SECTOR
Page 36
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 81282 46750
JNSTPP(JAYPEE NIGRIE) JP POWER VENTURES LTD THERMAL-COAL 132000 726695 29310
MB POWER MB POWER THERMAL-COAL 120000 345632 38310
ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 754922 28671
ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 780761 23495
ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 198000 1263784 32090
ADANI POWER MAHARA ADANI POWER LTD THERMAL-COAL 330000 1666191 34124
AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 170065 36827
SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 252035 45129
ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 458551 36000
ESSAR POWER MP LTD ESSAR POWER MP LTD THERMAL-COAL 60000 243040 28600
VEDANTA LTD (P P -I) VEDANTA LTD THERMAL-GAS 3000 15044 24000
VEDANTA LTD (P P -II) VEDANTA LTD THERMAL-GAS 3000 21293 24000
PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 8234600 24000
165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 5850 64390
145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 68717 40349
SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 132655 28776
SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 144686 38567
MUNDRA UMPPCOASTAL GUJARAT POWER
LTD THERMAL-IMP COAL 400000 2530300
23900
LANCO AMARKANTAK TPP PATHADIH
U-ILANCO AMARKAN POWER LTD THERMAL-COAL 30000 195500
29200
LANCO AMARKANTAK TPP PATHADIH
U-IILANCO AMARKAN POWER LTD THERMAL-COAL 30000 206900
27600
BARADARHA TPS D B POWER LTD THERMAL-COAL 120000 677373 29200
JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 405000 28900
JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 453000 40500
DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 339437 40700
TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 293400 44000
TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 137200 37000
TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 174900 44000
BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 92900 14100
BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23700 34300
KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 27600 48300
CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2530300 23900
BHANDARDRA HEP -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 2475 54900
SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 161400 26500
SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 445000 39000
SOTHERN REGION
CENTRAL SECTOR
NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 325699 54820
NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 305532 39880
NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 998805 38510
NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 113016 54070
NEYVELI TAMILNADU POWER LTD JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 625274 42200
VALLUR TPS NTPC TECL THERMAL-COAL 150000 856438 42350
R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 1493 84300
RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1502919 29400
RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 341291 31800
SIMHADRI I NTPC LTD THERMAL-COAL 100000 688382 36800
SIMHADRI II NTPC LTD THERMAL-COAL 100000 663657 43400
KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 593110 31324
MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 291625 21764
KKNPP-1 amp 2 NPCIL NUCLEAR-NUCLEAR 200000 572609 40948
MINICOY LAKSHADEEP THERMAL-DIESEL 340 770 29600
KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1097 29600
AMINI LAKSHADEEP THERMAL-DIESEL 265 509 29600
ANDROTT LAKSHADEEP THERMAL-DIESEL 219 524 29600
KALPENI LAKSHADEEP THERMAL-DIESEL 175 356 29600
AGATTI LAKSHADEEP THERMAL-DIESEL 195 658 29600
KADMAT LAKSHADEEP THERMAL-DIESEL 190 414 29600
KILTAN LAKSHADEEP THERMAL-DIESEL 150 269 29600
CHETLET LAKSHADEEP THERMAL-DIESEL 100 139 29600
BITRA LAKSHADEEP THERMAL-DIESEL 043 024 29600
BANGARAM LAKSHADEEP THERMAL-DIESEL 018 009 29600
Page 37
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) STATE SECTOR
Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 721811 46500
Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 50000 336142 46500
RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 237358 46500
RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 239926 46500
RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 124500 46500
SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 62109 46500
UPPER SILERU APGENCO HYDRO-HYDRO 24000 33000 46500
LOWER SILERU APGENCO HYDRO-HYDRO 46000 81066 46500
DONKARAI APGENCO HYDRO-HYDRO 2500 6007 46500
PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 1262 46500
CHETTIPETA APGENCO HYDRO-HYDRO 100 214 46500
MUCHKUND APGENCO HYDRO-HYDRO 12000 37571 46500
NAGARJUNASAGAR RCPH APGENCO HYDRO-HYDRO 9000 606 46500
TUNGABHADRA HES amp HAMPI(AP
Share)
APGENCO HYDRO-HYDRO 7200 6100 46500
KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 352232 42600
KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 288131 32500
KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 319272 46500
RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 40073 44300
KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 308317 46000
KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 308963 51300
SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 61004 76600
NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 17960 75300
PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 20873 58300
POCHAMPAD-I TSPGENCO HYDRO-HYDRO 2700 5455 29800
POCHAMPAD-II TSPGENCO HYDRO-HYDRO 900 1932 40700
NIZAMSAGAR TSPGENCO HYDRO-HYDRO 1000 1126 53400
RAICHUR TPS 1 to 7 KPCL THERMAL-COAL 147000 890866 43800
RAICHUR TPS 8 KPCL THERMAL-COAL 25000 159523 48200
BELLARI TPS 1 KPCL THERMAL-COAL 50000 318679 51100
BELLARI TPS 2 KPCL THERMAL-COAL 50000 232347 55600
BELLARI TPS 3 KPCL THERMAL-COAL 70000 47565 34400
BHADRA PH KPCL HYDRO-HYDRO 3920 2369 45900
GERUSUPPA PH KPCL HYDRO-HYDRO 24000 26990 22000
GHAT PRABHA HEP KPCL HYDRO-HYDRO 3200 4777 25300
KADRA HPS KPCL HYDRO-HYDRO 15000 16889 26800
NAGJHARI KPCL HYDRO-HYDRO 90000 155159 9800
KODASALLI DPH KPCL HYDRO-HYDRO 12000 14854 19200
MUNIRA+MGH+SPH+SPH KPCL HYDRO-HYDRO 22640 48211 7900
SHARAVATHY HPS KPCL HYDRO-HYDRO 108550 276215 5400
ALMATTI DPH KPCL HYDRO-HYDRO 29000 39611 24600
VARAHI UGPH KPCL HYDRO-HYDRO 46000 71368 15600
IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 17196 15300
IDUKKI HPS KSEB HYDRO-HYDRO 78000 137905 15300
KAKKAD HPS KSEB HYDRO-HYDRO 5000 13063 15300
KALLADA HPS KSEB HYDRO-HYDRO 1500 4436 15300
KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 46544 15300
KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 635 15300
LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 30822 15300
MALANKARA HPS KSEB HYDRO-HYDRO 1050 2474 15300
MATTUPETTY KSEB HYDRO-HYDRO 200 230 15300
MALAMPUZHA KSEB HYDRO-HYDRO 250 063 15300
CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 864 15300
URUMI ST I amp II KSEB HYDRO-HYDRO 615 903 15300
LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 248 15300
NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7765 19625 15300
PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 16601 15300
PANNIAR HPS KSEB HYDRO-HYDRO 3240 6217 15300
PORINGALKUTHU KSEB HYDRO-HYDRO 3600 10052 15300
PORINGALKUTHU LBE KSEB HYDRO-HYDRO 1600 9438 15300
PEPPARA KSEB HYDRO-HYDRO 300 395 15300
POOZHITHODE KSEB HYDRO-HYDRO 480 1045 15300
Page 38
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) PEECHI KSEB HYDRO-HYDRO 125 040 15300
RANI-PERUNADU KSEB HYDRO-HYDRO 400 585 15300
SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 79783 15300
SENGULAM HPS KSEB HYDRO-HYDRO 5120 11558 15300
SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 16711 15300
VILANGAD KSEB HYDRO-HYDRO 750 1578 15300
BARAPOLE KSEB HYDRO-HYDRO 1500 1932 15300
VELLATHOOVAL KSEB HYDRO-HYDRO 360 305 15300
CHIM0NY KSEB HYDRO-HYDRO 250 156 15300
ADYANPARA KSEB HYDRO-HYDRO 350 501 15300
BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 554 15300
KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 3801 15300
KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 23132 32800
ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 14416 62280
METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 523970 62280
METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 321270 62280
NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 336575 62280
NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 591240 62280
TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 508966 62280
KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 30897 62280
VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 18720 90699 62280
KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 33593 62280
BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 1047 62280
PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 1250 62280
PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 330 62280
MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 4897 62280
MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 032 62280
KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15681 62280
KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 40608 62280
KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 21342 62280
KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 4717 62280
KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4322 62280
KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2399 62280
METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 4416 62280
METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 8035 62280
BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2187 62280
BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2359 62280
BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2511 62280
BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 1949 62280
BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 1819 62280
POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 172 62280
SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 241 62280
MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 026 62280
THIRUMOORTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 136 62280
PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 9309 62280
VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 353 62280
SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 4192 62280
PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 6571 62280
SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 1186 62280
SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6319 62280
ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 6122 62280
KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 28674 62280
SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 18381 62280
SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 4258 62280
KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 12680 62280
KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4201 62280
ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 000 62280
PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 19175 62280
AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 078 62280
BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 504 62280
BHAVANI KATTALAI (BKB)(IIIampIII BB I amp II)TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 5847 62280
PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 000 62280
Page 39
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) SRI DAMODARAM STPS APPDCL THERMAL-COAL 160000 808108 36300
PRIVATE SECTOR
KARUPPUR TANJORE LANCO TANJORE PCL THERMAL-GAS 12000 48096 28770
SIMHAPURI ENERGY LTD SIMHAPURI ENERGY LTD THERMAL-COAL 60000 143900 39100
JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 7111 45500
SBU 1 JSW ENERGY LTD
VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 26000 159100
43300
SBU 2 JSW ENERGY LTD
VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 60000 247900
42800
LANCO KPLLANCO KONDAPALLI POWER
LTDTHERMAL-GAS 36814 85060
25776
LANCO KPL STG -IILANCO KONDAPALLI POWER
LTDTHERMAL-GAS 36600 12979
46330
LANCO KPL STG -IIIALANCO KONDAPALLI POWER
LTDTHERMAL-GAS 37100 85710
46330
LANCO KPL STG -III BLANCO KONDAPALLI POWER
LTDTHERMAL-GAS 37100 43639
46330
HINDUJA NATIONAL PCL HINDUJA NATIONAL PCL THERMAL-COAL 104000 303000 38200
MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 121164 49940
UDUPI POWER COR LTD ADANI POWER LTD THERMAL-COAL 120000 754613 42500
SPECTRUM POWER GENERATION
LTD SPECTRUM PG LTD THERMAL-GASN 20525 9256812
34952
TAQA NEYVELI POWER COM PVT
LTD TAQA NEYVELI THERMAL-LIG 25000 5840
34500
ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 251000 51000
ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 207860 36800
GMR VEMAGIRI POWER GENERATION
LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 30117
46450
EASTERN REGION
CENTRAL SECTOR
MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 64675 53113
MTPS STAGE - II KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 39000 1432 69138
BOKARO `B` TPS DVC THERMAL-COAL 63000 145670 31539
MEJIA TPS U 1-3 DVC THERMAL-COAL 63000 348298 31552
MEJIA TPS U 4 DVC THERMAL-COAL 21000 116099 34997
MEJIA TPS U 5-6 DVC THERMAL-COAL 50000 276427 35976
MEJIA TPS U 7-8 DVC THERMAL-COAL 100000 552854 36991
DURGAPUR STEEL TPS DVC THERMAL-COAL 100000 665550 39323
DURGAPUR TPS DVC THERMAL-COAL 21000 59270 35416
RAGHUNATHPUR TPS DVC THERMAL-COAL 120000 201650 35326
MAITHON HYDEL STA DVC HYDRO-HYDRO 6320 12200 17984
CHANDRAPURA TPSU1-3 DVC THERMAL-COAL 42000 257610 35095
CHANDRAPURA TPSU7-8 DVC THERMAL-COAL 50000 306673 34987
KODERMA TPS DVC THERMAL-COAL 100000 380180 38131
PANCHET HPS DVC HYDRO-HYDRO 8000 13360 17984
TILLAYA HPS DVC HYDRO-HYDRO 400 1410 17984
RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34700 35400
TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 277300 23200
TLDP -III NHPC LTD HYDRO-HYDRO 13200 55400 62000
TLDP -IV NHPC LTD HYDRO-HYDRO 16000 60300 25600
FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 957219 33700
FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 308943 41000
BONGAINGAON TPS NTPC LTD THERMAL-COAL 25000 153663 58600
KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 542277 34200
KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 942591 34200
BARH-II NTPC LTD THERMAL-COAL 132000 728021 44500
TALCHER TPS NTPC LTD THERMAL-COAL 46000 335521 30100
TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 702319 25600
TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1436521 24700
STATE SECTOR
BTPS(RampM) BIHAR STATE PGCL THERMAL-COAL 22000 12142 39700
BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 98331 10602
HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 50593 9482
CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 19689 2605
RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 53192 6033
UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 147208 14637
Page 40
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 60353 4519
IB TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 288567 25000
J P H GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 210 038 61100
MEYONG CHU GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 400 1086 61100
TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 122667 38200
DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 214339 43321
KOLAGHAT THERMAL POWER
STATION
WEST BENGAL PDCL THERMAL-COAL 126000 538269 31603
BAKRESHWAR THERMAL POWER
PLANT
WEST BENGAL PDCL THERMAL-COAL 105000 634876 32154
BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 45000 166855 33299
SANTHALDIH THERMAL POWER
STATION
WEST BENGAL PDCL THERMAL-COAL 50000 336442 34932
SAGARDIGHI THERMAL POWER
PROJECT
WEST BENGAL PDCL THERMAL-COAL 160000 423121 34705
JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 20344 68900
RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 24559 68900
TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 4623 68900
PURULIA PUMPED STORAGE
PROJECT
WEST BENGAL SEDCL HYDRO-HYDRO 90000 108816 68900
MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2768 68900
PRIVATE SECTOR
CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 49474 20230
CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 555500 70200
HALDIA ENERGY HALDIA ENERGY LTD THERMAL-COAL 60000 371000 50400
DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3688 63400
KAMALANGA TPS GMR KAMALANGA ENERGY LTD THERMAL-COAL 105000547670
33300
ADHUNIK POWER U-1 ADHUNIK POWER THERMAL-COAL 27000 158 44060
ADHUNIK POWER U-2 ADHUNIK POWER THERMAL-COAL 27000 168 44250
VL-JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 332800 23622
JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 43000 45250
JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 71700 37030
JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 70700 35920
JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 71100 38870
JOJOBERA UNIT 5 TATA POWER COM LTD THERMAL-COAL 12000 79300 44560
JOJOBERA UNIT 6 TATA POWER COM LTD THERMAL-WHR 12000 83700 12840
IEL KALINGANAGAR U-I TATA POWER COM LTD THERMAL-WG 6750 33400 22500
IEL KALINGANAGAR U-II TATA POWER COM LTD THERMAL-WG 6750 34800 22500
MAITHON UNIT 1 amp 2 TATA POWER COM LTD THERMAL-COAL 105000 678000 36100
HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 27500 24340
HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 28400 24340
HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 15800 24310
NORTH EASTERN REGION
CENTRAL SECTOR
LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 74100 36600
AGARTALA GT NEEPCO THERMAL-GAS 13500 88611 27210
ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 153111 32310
DOYANG HEP NEEPCO HYDRO-HYDRO 7500 25598 49801
KOPILI HEP NEEPCO HYDRO-HYDRO 20000 98186 11491
KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 19582 20237
KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 10310 17968
RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 124093 22945
TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 10100 17344 39000
STATE SECTOR
HYDRO POWER (122 Stns) ITANAGAR GOVT OF ARUNACHAL
PRADESHHYDRO-HYDRO 6971 6217270
24600
KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39514 17337
LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 82327 36810
NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 33318 48290
MYNTRIANG SHEP ST II ASSAM POWER GENCO HYDRO-HYDRO 300 567 35776
LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 9130 49200
LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 012 49200
DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 022 49200
TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 000 49200
UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 4990 16000
UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 6476 37000
UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 16494 14600
UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 3600 9556 15000
SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 758 8000
MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44070 44800
KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 154 41400
TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 091 41400
MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 411 41400
MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 394 41400
KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 760 41400
SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 3264 41400
LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 044 41400
BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 18953 28000
ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 43585 28200
GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 4080 11100
Note
LIG Lignite N Naptha WHR Waste Heat Recovery
Page 41
Sl
NoExecuting Agency
Installed
Capacity (MW)Cost (Rs crore)
Date of
Clearance
32
Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as
Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received
from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made
available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified
villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is
independent of the earlier published reports
No Hydro Electric Project has been issued concurrenceAppraisal letter by CEA during April 2019
7 Status of Hydro Schemes Cleared by the CEA in Apr-2019
Name of Scheme
1999-002000-01
297594
010408 to 310309010409 to 310310
10th Plan
2005-062006-07
322968331020
6 Growth Of Rural Electrification amp Pumpsets Energisation
Plan Year
9th Plan2002-03
134092626
4111
Pump Sets Energised Villages Electricfied (Nos)
2001-02
284064367244
1218
27801997-981998-99
3207
482864
12632
1576036
4451722594
15455554
2314176
397343611750
2093311060316074
65109527813884
46708
18423975
499150
2003-042004-05
5743
9769
Cumu upto End of 10th Plan
010407 to 310308
010410 to 310311557976840909
010411 to 310312
412667
86293726
No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification
since 2004-05
65291374575 296361511th Plan
Cumu upto End of 11th Plan
596556 21212860
557439Cummulative up to end of 12th Plan
SN Contents Page
1 Rate of sale of power for the year 2016-17 33-41
RATE OF SALE OF POWER FOR THE YEAR 2016-17
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) NORTHERN REGION
CENTRAL SECTOR
BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 18000 66900 19800
CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 54000 222400 21600
CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 30000 144400 19600
CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 23100 91700 42600
PARBATI - III HPS NHPC LTD HYDRO-HYDRO 52000 68200 54800
DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 28000 95600 30000
CHUTAK NHPC LTD HYDRO-HYDRO 4400 22000 79800
DULHASTI HPS NHPC LTD HYDRO-HYDRO 39000 228000 56400
SALAL HPS NHPC LTD HYDRO-HYDRO 69000 342300 11000
TANAKPUR HPS NHPC LTD HYDRO-HYDRO 9420 43000 29600
URI HPS -I NHPC LTD HYDRO-HYDRO 48000 280300 16000
URI HPS - II NHPC LTD HYDRO-HYDRO 24000 147300 48600
NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 4500 24600 88200
SEWA - II NHPC LTD HYDRO-HYDRO 12000 47100 43400
ANTA CCPP NTPC LTD THERMAL-GASN 41930 67539 32400
AURAIYA CCPP NTPC LTD THERMAL-GASN 66336 53501 39100
BADARPUR TPS NTPC LTD THERMAL-COAL 70500 159153 44800
DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 84000 296170 42300
DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 98000 526686 46300
DADRI CCPP NTPC LTD THERMAL-GASHSD 82978 227469 33000
FARIDABAD CCPP NTPC LTD THERMAL-GASN 43159 115577 30800
RIHAND STPS I NTPC LTD THERMAL-COAL 100000 596766 24500
RIHAND STPS II NTPC LTD THERMAL-COAL 100000 737069 24600
RIHAND STPS III NTPC LTD THERMAL-COAL 100000 706546 30600
SINGRAULI STPS NTPC LTD THERMAL-COAL 200000 1394068 20400
TANDA TPS NTPC LTD THERMAL-COAL 44000 295438 40800
UNCHAHAR TPS I NTPC LTD THERMAL-COAL 42000 256454 39800
UNCHAHAR TPS II NTPC LTD THERMAL-COAL 42000 273577 38900
UNCHAHAR TPS III NTPC LTD THERMAL-COAL 21000 142780 43000
KOLDAM NTPC LTD HYDRO-HYDRO 80000 363260 43600
NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 303575 25841
RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 108000 668677 35374
NJHPS SJVNL HYDRO-HYDRO 150000 699496 23820
RAMPUR HPS SJVNL HYDRO-HYDRO 41202 195982 32260
TEHRI HPP THDC HYDRO-HYDRO 100000 272543 51800
KOTESHWAR HEP THDC HYDRO-HYDRO 40000 106244 53400
IGSTPS JHAJJAR ARAVALI P CPL THERMAL-COAL 150000 510429 49490
NEYVELI BARSINGSAR NEYVELI LIG CORP LTD THERMAL-LIG 25000 127520 38040
STATE SECTOR
PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 21000 14222 48200
PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 21000 19205 48400
PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 25000 102257 42600
PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 25000 62107 41800
DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 60000 312213 41000
RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 120000 35767442200
WYC HYDEL STATION HPGCL HYDRO-HYDRO 6240 20365 24900
GIRI POWER HOUSE HPSEB HYDRO-HYDRO 6000 13958 7600
ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 1695 5467 11900
BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 12000 18528 6700
GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 2250 7462 22500
BASSI POWER HOUSE HPSEB HYDRO-HYDRO 6600 29649 7500
BINWA POWER HOUSE HPSEB HYDRO-HYDRO 600 2749 19300
ANNEXURE-I
RATE OF SALE OF POWER FOR THE YEAR 2016-2017
Page 33
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) GAJ POWER HOUSE HPSEB HYDRO-HYDRO 1050 2914 26700
BANER POWER HOUSE HPSEB HYDRO-HYDRO 1200 2864 16200
HOLI POWER HOUSE HPSEB HYDRO-HYDRO 300 616 22500
THIROT POWER HOUSE HPSEB HYDRO-HYDRO 450 1126 22500
KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 1200 3064 22500
LARJI POWER HOUSE HPSEB HYDRO-HYDRO 12600 53677 23700
NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 250 750 31000
CHABA POWER HOUSE HPSEB HYDRO-HYDRO 175 465 23300
RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 150 101 13400
SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 200 000 22500
KILLAR HPSEB HYDRO-HYDRO 030 050 22500
BHABA AUGUMENP H HPSEB HYDRO-HYDRO 450 1276 22500
BS CHAMBA HPSEB HYDRO-HYDRO 045 099 19500
GUMMA HPSEB HYDRO-HYDRO 300 423 22500
GAS TURBINE POWER STATION IPGCL THERMAL-GAS 27000 67233 39300
PPS-I PPCL THERMAL-GAS 33000 175905 38300
PPS-III PPCL THERMAL-GAS 137120 196879 36100
LOWER JHELUM JampKPDD HYDRO-HYDRO 10500 60214 5100
UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 2260 10514 6300
UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 10500 44202 8500
GANDHARBAL JampKPDD HYDRO-HYDRO 1500 8925 4700
KARNAH MPH JampKPDD HYDRO-HYDRO 200 1122 31000
CHENANI I JampKPDD HYDRO-HYDRO 2330 10892 6600
CHENANI II JampKPDD HYDRO-HYDRO 200 1188 9300
CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 750 3634 14200
IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 375 2108 18500
IGO MERCHELLONG JampKPDD HYDRO-HYDRO 300 1572 29700
PAHALGAM MHP JampKPDD HYDRO-HYDRO 450 1713 32900
MARPACHOO JampKPDD HYDRO-HYDRO 075 375 29800
HAFTAL JampKPDD HYDRO-HYDRO 100 483 28700
SANJAK JampKPDD HYDRO-HYDRO 126 441 36000
SEWA-III JampKPDD HYDRO-HYDRO 900 3273 20200
BHADERWAH JampKPDD HYDRO-HYDRO 150 935 8900
BAZGO JampKPDD HYDRO-HYDRO 030 108 33300
SUMOOR JampKPDD HYDRO-HYDRO 010 045 35400
HUNDER JampKPDD HYDRO-HYDRO 040 176 26200
STAKNA JampKPDD HYDRO-HYDRO 400 1933 4100
KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 124000 662879 31360
SURATGARH TPS RRVUNL THERMAL-COAL 150000 402328 41730
CHHABRA TPS 1amp 2 RRVUNL THERMAL-COAL 50000 305946 36700
CHHABRA TPS 3 RRVUNL THERMAL-COAL 25000 151536 36700
CHHABRA TPS 4 RRVUNL THERMAL-COAL 25000 155896 36700
RAMGARH GT POWER PROJECT RRVUNL THERMAL-COAL 22050 43177 41800
RAMGARH GAS T P PROJECT 3 RRVUNL THERMAL-GAS 5000 93615 41800
DHOLPUR C C POWER PROJECT RRVUNL THERMAL-R-LNG 33000 9486 46110
MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 14000 20855 34192
MINI MICRO HYDEL (MMH) P S RRVUNL HYDRO-HYDRO 2385 851 37800
KALISINDH TPP 1 RRVUNL THERMAL-COAL 60000 341543 45000
KALISINDH TPP 2 RRVUNL THERMAL-COAL 60000 211588 45000
KHARA HEP UPJVNL HYDRO-HYDRO 7200 26654 7200
MATATILLA HEP UPJVNL HYDRO-HYDRO 3060 12219 6500
OBRA HEP UPJVNL HYDRO-HYDRO 9900 21517 6300
RIHAND UPJVNL HYDRO-HYDRO 30000 57369 5500
ANPARA A TPS UPRVUNL THERMAL-COAL 63000 317536 27000
ANPARA B TPS UPRVUNL THERMAL-COAL 100000 705605 22700
ANPARA D UPRVUNL THERMAL-COAL 100000 300158 39800
HARDUAGANJ TPS UPRVUNL THERMAL-COAL 16500 45817 49200
HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 50000 304389 46600
OBRA A TPS UPRVUNL THERMAL-COAL 28800 13158 34000
OBRA B TPS UPRVUNL THERMAL-COAL 100000 328124 21900
Page 34
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) PANKI TPS UPRVUNL THERMAL-COAL 21000 66488 50300
PARICHHA TPS UPRVUNL THERMAL-COAL 22000 38762 49400
PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 42000 231931 45600
PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 50000 276722 50400
CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 24000 70845 8290
CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 14400 75366 8390
DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 3375 9595 12080
DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 5100 18701 10520
KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4140 17359 12330
KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 12000 33001 9420
KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 3000 11953 8320
TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 9000 33983 12460
MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 30400 124510 16110
RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 19800 17897 10550
MPUR UTTARAKHAND JVNL HYDRO-HYDRO 930 5121 19200
PATHRI UTTARAKHAND JVNL HYDRO-HYDRO 2040 11636 14200
GALOGI UTTARAKHAND JVNL HYDRO-HYDRO 300 648 12500
PRIVATE SECTOR
MGTPP CLP INDIA PVT LTD THERMAL-COAL 132000 268902 41940
SHRINAGAR HEP ALAKNANDA HPCL HYDRO-HYDRO 33000 127414 48800
GAMA INFRAPROP CCPP GAMA INFRAPROP PVT THERMAL-GAS 22500 52686 47000
PPGCL (BARA) JP POWER VENTURES LTD THERMAL-COAL 198000 448200 38500
MALANA HEP MALANA PCL HYDRO-HYDRO 8600 26354 29792
MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 10000 30369 32580
ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 19200 56347 36079
KASHANG HEP H P PCL HYDRO-HYDRO 19500 5034 29200
BASPA-II HEP HBPCL HYDRO-HYDRO 30000 132769 13600
KARCHAM WANGTOO HEP HBPCL HYDRO-HYDRO 100000 434386 36600
RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 108000 582600 43700
RITHALA COMBI CY POWER PLANT TATA POWER DDL THERMAL-GAS 9480 000 11900
RAJPURA TPS NABHA POWER LTD THERMAL-GAS 140000 901484 39000
TALWANDI SABO POWER LTD TALWANDI SABO POWER LTD THERMAL-COAL 198000 636040 49548
ROJA THERMAL POWER STATION ROJA POWER SCL THERMAL-COAL 120000 727200 43400
KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 34400 63400
BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 36000 62600
MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 38200 60800
UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 37900 61500
KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 42300 58800
LALITPUR PGCL BAJAJ ENERGY PVT LTD THERMAL-COAL 198000 359400 47300
PRAYAGRAJ PGCL PRAYAGRAJ PGCL THERMAL-COAL 132000 448200 38595
KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 132000 783182 33438
WESTERN REGION
CENTRAL SECTOR
INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 100000 325333 23892
OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 52000 141663 34001
GANDHAR CCPP NTPC LTD THERMAL-GAS 65739 221924 28700
KAWAS CCPP NTPC LTD THERMAL-GASN 65620 167929 27000
KORBA I amp II NTPC LTD THERMAL-COAL 210000 1499171 20500
KORBA III NTPC LTD THERMAL-COAL 50000 358746 26600
SIPAT STPS I NTPC LTD THERMAL-COAL 198000 1479902 26800
SIPAT STPS II NTPC LTD THERMAL-COAL 100000 766549 26500
VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 126000 693142 25800
VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 100000 608781 23800
VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 100000 673475 27600
VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 100000 655924 32900
VINDHYACHAL STPS V NTPC LTD THERMAL-COAL 50000 328265 31700
MOUDA I NTPC LTD THERMAL-COAL 100000 343130 44500
MOUDA Ii NTPC LTD THERMAL-COAL 66000 40637 39900
RATNAGIRI GAS amp POWER PVT LTD RGPPL THERMAL-GAS 196708 442485 47000
KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 000 24729
TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 32000 201227 10740
Page 35
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 365122 19069
TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 787444 29324
STATE SECTOR
GSEG-HAZIRA15610 MW GUJARAT S ENEGEN LTD THERMAL-GAS 15610 1805 28200
GSEG-HAZIRA35143 MW GUJARAT S ENEGEN LTD THERMAL-GAS 35130 22276 51300
GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 21978 51800
AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 13929 26100
KORBA TPS EAST CSPGCL THERMAL-COAL 44000 198673 33880
DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 365808 27570
KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 316500 30420
HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 532878 19410
CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 515 58300
MTTPS CHAMPA U-I CSPGCL THERMAL-COAL 50000 220376 39000
MTTPS CHAMPA U-II CSPGCL THERMAL-COAL 50000 23709 10000
SHP GANGREL CSPGCL HYDRO-HYDRO 1000 2350 36790
BANGO HEP CSPGCL HYDRO-HYDRO 12000 14662 8900
MHP KORBA WEST CSPGCL HYDRO-HYDRO 170 859 38190
SIKASAR HEP CSPGCL HYDRO-HYDRO 700 418 26870
DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8843 74500
DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 19446 51500
GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 66388 71600
GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127488 41300
KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 96072 43900
KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 29841 56400
SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 184966 58800
UKAI 1-5 GSECL THERMAL-COAL 85000 204891 46900
UKAI TPS 6 GSECL THERMAL-COAL 50000 284448 48200
WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 271999 58300
WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 82808 44100
KADANA HPS GSECL HYDRO-HYDRO 24200 34433 16800
UKAI HPS GSECL HYDRO-HYDRO 30500 40585 6100
TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 123000 11500
BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 8900 10900
BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 7200 27500
JHINNA HPS MPPGCL HYDRO-HYDRO 2000 9700 18500
RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 44300 3400
GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 17300 4600
SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 4100 16900
MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 14600 27000
PENCH HPS MPPGCL HYDRO-HYDRO 16000 23700 8100
RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 3000 16900
AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 134400 35100
SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 283800 38700
SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 344600 34300
SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 111600 61600
SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 211800 58000
SSTPS PH-I MPPGCL THERMAL-COAL 120000 233100 84300
BHUSAWAL TPS MSPGCL THERMAL-COAL 142000 566258 51100
CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1365682 33700
KHAPERKHEDA MSPGCL THERMAL-COAL 134000 706207 39100
KORADI TPS MSPGCL THERMAL-COAL 62000 443206 42000
NASIK TPS MSPGCL THERMAL-COAL 63000 297275 47000
PARLI TPS MSPGCL THERMAL-COAL 113000 175934 71600
PARAS MSPGCL THERMAL-COAL 50000 267931 38700
URAN CCPP MSPGCL THERMAL-GAS 67200 320330 30600
KOYANA MSPGCL HYDRO-HYDRO 195600 328155 13100
SMALL HYDRO POWER PLANTS MSPGCL HYDRO-HYDRO 45400 93062 30500
BHIRA MSPGCL HYDRO-HYDRO 8000 10046 8400
TILLARI MSPGCL HYDRO-HYDRO 8900 10584 3100
SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 233298 20500
SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 87633 20500
PRIVATE SECTOR
Page 36
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 81282 46750
JNSTPP(JAYPEE NIGRIE) JP POWER VENTURES LTD THERMAL-COAL 132000 726695 29310
MB POWER MB POWER THERMAL-COAL 120000 345632 38310
ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 754922 28671
ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 780761 23495
ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 198000 1263784 32090
ADANI POWER MAHARA ADANI POWER LTD THERMAL-COAL 330000 1666191 34124
AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 170065 36827
SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 252035 45129
ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 458551 36000
ESSAR POWER MP LTD ESSAR POWER MP LTD THERMAL-COAL 60000 243040 28600
VEDANTA LTD (P P -I) VEDANTA LTD THERMAL-GAS 3000 15044 24000
VEDANTA LTD (P P -II) VEDANTA LTD THERMAL-GAS 3000 21293 24000
PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 8234600 24000
165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 5850 64390
145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 68717 40349
SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 132655 28776
SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 144686 38567
MUNDRA UMPPCOASTAL GUJARAT POWER
LTD THERMAL-IMP COAL 400000 2530300
23900
LANCO AMARKANTAK TPP PATHADIH
U-ILANCO AMARKAN POWER LTD THERMAL-COAL 30000 195500
29200
LANCO AMARKANTAK TPP PATHADIH
U-IILANCO AMARKAN POWER LTD THERMAL-COAL 30000 206900
27600
BARADARHA TPS D B POWER LTD THERMAL-COAL 120000 677373 29200
JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 405000 28900
JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 453000 40500
DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 339437 40700
TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 293400 44000
TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 137200 37000
TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 174900 44000
BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 92900 14100
BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23700 34300
KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 27600 48300
CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2530300 23900
BHANDARDRA HEP -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 2475 54900
SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 161400 26500
SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 445000 39000
SOTHERN REGION
CENTRAL SECTOR
NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 325699 54820
NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 305532 39880
NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 998805 38510
NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 113016 54070
NEYVELI TAMILNADU POWER LTD JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 625274 42200
VALLUR TPS NTPC TECL THERMAL-COAL 150000 856438 42350
R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 1493 84300
RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1502919 29400
RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 341291 31800
SIMHADRI I NTPC LTD THERMAL-COAL 100000 688382 36800
SIMHADRI II NTPC LTD THERMAL-COAL 100000 663657 43400
KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 593110 31324
MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 291625 21764
KKNPP-1 amp 2 NPCIL NUCLEAR-NUCLEAR 200000 572609 40948
MINICOY LAKSHADEEP THERMAL-DIESEL 340 770 29600
KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1097 29600
AMINI LAKSHADEEP THERMAL-DIESEL 265 509 29600
ANDROTT LAKSHADEEP THERMAL-DIESEL 219 524 29600
KALPENI LAKSHADEEP THERMAL-DIESEL 175 356 29600
AGATTI LAKSHADEEP THERMAL-DIESEL 195 658 29600
KADMAT LAKSHADEEP THERMAL-DIESEL 190 414 29600
KILTAN LAKSHADEEP THERMAL-DIESEL 150 269 29600
CHETLET LAKSHADEEP THERMAL-DIESEL 100 139 29600
BITRA LAKSHADEEP THERMAL-DIESEL 043 024 29600
BANGARAM LAKSHADEEP THERMAL-DIESEL 018 009 29600
Page 37
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) STATE SECTOR
Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 721811 46500
Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 50000 336142 46500
RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 237358 46500
RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 239926 46500
RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 124500 46500
SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 62109 46500
UPPER SILERU APGENCO HYDRO-HYDRO 24000 33000 46500
LOWER SILERU APGENCO HYDRO-HYDRO 46000 81066 46500
DONKARAI APGENCO HYDRO-HYDRO 2500 6007 46500
PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 1262 46500
CHETTIPETA APGENCO HYDRO-HYDRO 100 214 46500
MUCHKUND APGENCO HYDRO-HYDRO 12000 37571 46500
NAGARJUNASAGAR RCPH APGENCO HYDRO-HYDRO 9000 606 46500
TUNGABHADRA HES amp HAMPI(AP
Share)
APGENCO HYDRO-HYDRO 7200 6100 46500
KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 352232 42600
KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 288131 32500
KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 319272 46500
RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 40073 44300
KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 308317 46000
KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 308963 51300
SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 61004 76600
NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 17960 75300
PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 20873 58300
POCHAMPAD-I TSPGENCO HYDRO-HYDRO 2700 5455 29800
POCHAMPAD-II TSPGENCO HYDRO-HYDRO 900 1932 40700
NIZAMSAGAR TSPGENCO HYDRO-HYDRO 1000 1126 53400
RAICHUR TPS 1 to 7 KPCL THERMAL-COAL 147000 890866 43800
RAICHUR TPS 8 KPCL THERMAL-COAL 25000 159523 48200
BELLARI TPS 1 KPCL THERMAL-COAL 50000 318679 51100
BELLARI TPS 2 KPCL THERMAL-COAL 50000 232347 55600
BELLARI TPS 3 KPCL THERMAL-COAL 70000 47565 34400
BHADRA PH KPCL HYDRO-HYDRO 3920 2369 45900
GERUSUPPA PH KPCL HYDRO-HYDRO 24000 26990 22000
GHAT PRABHA HEP KPCL HYDRO-HYDRO 3200 4777 25300
KADRA HPS KPCL HYDRO-HYDRO 15000 16889 26800
NAGJHARI KPCL HYDRO-HYDRO 90000 155159 9800
KODASALLI DPH KPCL HYDRO-HYDRO 12000 14854 19200
MUNIRA+MGH+SPH+SPH KPCL HYDRO-HYDRO 22640 48211 7900
SHARAVATHY HPS KPCL HYDRO-HYDRO 108550 276215 5400
ALMATTI DPH KPCL HYDRO-HYDRO 29000 39611 24600
VARAHI UGPH KPCL HYDRO-HYDRO 46000 71368 15600
IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 17196 15300
IDUKKI HPS KSEB HYDRO-HYDRO 78000 137905 15300
KAKKAD HPS KSEB HYDRO-HYDRO 5000 13063 15300
KALLADA HPS KSEB HYDRO-HYDRO 1500 4436 15300
KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 46544 15300
KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 635 15300
LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 30822 15300
MALANKARA HPS KSEB HYDRO-HYDRO 1050 2474 15300
MATTUPETTY KSEB HYDRO-HYDRO 200 230 15300
MALAMPUZHA KSEB HYDRO-HYDRO 250 063 15300
CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 864 15300
URUMI ST I amp II KSEB HYDRO-HYDRO 615 903 15300
LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 248 15300
NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7765 19625 15300
PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 16601 15300
PANNIAR HPS KSEB HYDRO-HYDRO 3240 6217 15300
PORINGALKUTHU KSEB HYDRO-HYDRO 3600 10052 15300
PORINGALKUTHU LBE KSEB HYDRO-HYDRO 1600 9438 15300
PEPPARA KSEB HYDRO-HYDRO 300 395 15300
POOZHITHODE KSEB HYDRO-HYDRO 480 1045 15300
Page 38
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) PEECHI KSEB HYDRO-HYDRO 125 040 15300
RANI-PERUNADU KSEB HYDRO-HYDRO 400 585 15300
SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 79783 15300
SENGULAM HPS KSEB HYDRO-HYDRO 5120 11558 15300
SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 16711 15300
VILANGAD KSEB HYDRO-HYDRO 750 1578 15300
BARAPOLE KSEB HYDRO-HYDRO 1500 1932 15300
VELLATHOOVAL KSEB HYDRO-HYDRO 360 305 15300
CHIM0NY KSEB HYDRO-HYDRO 250 156 15300
ADYANPARA KSEB HYDRO-HYDRO 350 501 15300
BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 554 15300
KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 3801 15300
KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 23132 32800
ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 14416 62280
METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 523970 62280
METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 321270 62280
NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 336575 62280
NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 591240 62280
TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 508966 62280
KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 30897 62280
VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 18720 90699 62280
KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 33593 62280
BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 1047 62280
PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 1250 62280
PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 330 62280
MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 4897 62280
MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 032 62280
KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15681 62280
KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 40608 62280
KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 21342 62280
KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 4717 62280
KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4322 62280
KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2399 62280
METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 4416 62280
METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 8035 62280
BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2187 62280
BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2359 62280
BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2511 62280
BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 1949 62280
BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 1819 62280
POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 172 62280
SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 241 62280
MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 026 62280
THIRUMOORTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 136 62280
PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 9309 62280
VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 353 62280
SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 4192 62280
PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 6571 62280
SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 1186 62280
SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6319 62280
ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 6122 62280
KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 28674 62280
SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 18381 62280
SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 4258 62280
KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 12680 62280
KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4201 62280
ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 000 62280
PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 19175 62280
AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 078 62280
BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 504 62280
BHAVANI KATTALAI (BKB)(IIIampIII BB I amp II)TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 5847 62280
PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 000 62280
Page 39
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) SRI DAMODARAM STPS APPDCL THERMAL-COAL 160000 808108 36300
PRIVATE SECTOR
KARUPPUR TANJORE LANCO TANJORE PCL THERMAL-GAS 12000 48096 28770
SIMHAPURI ENERGY LTD SIMHAPURI ENERGY LTD THERMAL-COAL 60000 143900 39100
JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 7111 45500
SBU 1 JSW ENERGY LTD
VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 26000 159100
43300
SBU 2 JSW ENERGY LTD
VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 60000 247900
42800
LANCO KPLLANCO KONDAPALLI POWER
LTDTHERMAL-GAS 36814 85060
25776
LANCO KPL STG -IILANCO KONDAPALLI POWER
LTDTHERMAL-GAS 36600 12979
46330
LANCO KPL STG -IIIALANCO KONDAPALLI POWER
LTDTHERMAL-GAS 37100 85710
46330
LANCO KPL STG -III BLANCO KONDAPALLI POWER
LTDTHERMAL-GAS 37100 43639
46330
HINDUJA NATIONAL PCL HINDUJA NATIONAL PCL THERMAL-COAL 104000 303000 38200
MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 121164 49940
UDUPI POWER COR LTD ADANI POWER LTD THERMAL-COAL 120000 754613 42500
SPECTRUM POWER GENERATION
LTD SPECTRUM PG LTD THERMAL-GASN 20525 9256812
34952
TAQA NEYVELI POWER COM PVT
LTD TAQA NEYVELI THERMAL-LIG 25000 5840
34500
ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 251000 51000
ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 207860 36800
GMR VEMAGIRI POWER GENERATION
LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 30117
46450
EASTERN REGION
CENTRAL SECTOR
MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 64675 53113
MTPS STAGE - II KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 39000 1432 69138
BOKARO `B` TPS DVC THERMAL-COAL 63000 145670 31539
MEJIA TPS U 1-3 DVC THERMAL-COAL 63000 348298 31552
MEJIA TPS U 4 DVC THERMAL-COAL 21000 116099 34997
MEJIA TPS U 5-6 DVC THERMAL-COAL 50000 276427 35976
MEJIA TPS U 7-8 DVC THERMAL-COAL 100000 552854 36991
DURGAPUR STEEL TPS DVC THERMAL-COAL 100000 665550 39323
DURGAPUR TPS DVC THERMAL-COAL 21000 59270 35416
RAGHUNATHPUR TPS DVC THERMAL-COAL 120000 201650 35326
MAITHON HYDEL STA DVC HYDRO-HYDRO 6320 12200 17984
CHANDRAPURA TPSU1-3 DVC THERMAL-COAL 42000 257610 35095
CHANDRAPURA TPSU7-8 DVC THERMAL-COAL 50000 306673 34987
KODERMA TPS DVC THERMAL-COAL 100000 380180 38131
PANCHET HPS DVC HYDRO-HYDRO 8000 13360 17984
TILLAYA HPS DVC HYDRO-HYDRO 400 1410 17984
RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34700 35400
TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 277300 23200
TLDP -III NHPC LTD HYDRO-HYDRO 13200 55400 62000
TLDP -IV NHPC LTD HYDRO-HYDRO 16000 60300 25600
FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 957219 33700
FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 308943 41000
BONGAINGAON TPS NTPC LTD THERMAL-COAL 25000 153663 58600
KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 542277 34200
KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 942591 34200
BARH-II NTPC LTD THERMAL-COAL 132000 728021 44500
TALCHER TPS NTPC LTD THERMAL-COAL 46000 335521 30100
TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 702319 25600
TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1436521 24700
STATE SECTOR
BTPS(RampM) BIHAR STATE PGCL THERMAL-COAL 22000 12142 39700
BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 98331 10602
HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 50593 9482
CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 19689 2605
RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 53192 6033
UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 147208 14637
Page 40
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 60353 4519
IB TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 288567 25000
J P H GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 210 038 61100
MEYONG CHU GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 400 1086 61100
TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 122667 38200
DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 214339 43321
KOLAGHAT THERMAL POWER
STATION
WEST BENGAL PDCL THERMAL-COAL 126000 538269 31603
BAKRESHWAR THERMAL POWER
PLANT
WEST BENGAL PDCL THERMAL-COAL 105000 634876 32154
BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 45000 166855 33299
SANTHALDIH THERMAL POWER
STATION
WEST BENGAL PDCL THERMAL-COAL 50000 336442 34932
SAGARDIGHI THERMAL POWER
PROJECT
WEST BENGAL PDCL THERMAL-COAL 160000 423121 34705
JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 20344 68900
RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 24559 68900
TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 4623 68900
PURULIA PUMPED STORAGE
PROJECT
WEST BENGAL SEDCL HYDRO-HYDRO 90000 108816 68900
MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2768 68900
PRIVATE SECTOR
CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 49474 20230
CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 555500 70200
HALDIA ENERGY HALDIA ENERGY LTD THERMAL-COAL 60000 371000 50400
DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3688 63400
KAMALANGA TPS GMR KAMALANGA ENERGY LTD THERMAL-COAL 105000547670
33300
ADHUNIK POWER U-1 ADHUNIK POWER THERMAL-COAL 27000 158 44060
ADHUNIK POWER U-2 ADHUNIK POWER THERMAL-COAL 27000 168 44250
VL-JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 332800 23622
JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 43000 45250
JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 71700 37030
JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 70700 35920
JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 71100 38870
JOJOBERA UNIT 5 TATA POWER COM LTD THERMAL-COAL 12000 79300 44560
JOJOBERA UNIT 6 TATA POWER COM LTD THERMAL-WHR 12000 83700 12840
IEL KALINGANAGAR U-I TATA POWER COM LTD THERMAL-WG 6750 33400 22500
IEL KALINGANAGAR U-II TATA POWER COM LTD THERMAL-WG 6750 34800 22500
MAITHON UNIT 1 amp 2 TATA POWER COM LTD THERMAL-COAL 105000 678000 36100
HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 27500 24340
HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 28400 24340
HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 15800 24310
NORTH EASTERN REGION
CENTRAL SECTOR
LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 74100 36600
AGARTALA GT NEEPCO THERMAL-GAS 13500 88611 27210
ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 153111 32310
DOYANG HEP NEEPCO HYDRO-HYDRO 7500 25598 49801
KOPILI HEP NEEPCO HYDRO-HYDRO 20000 98186 11491
KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 19582 20237
KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 10310 17968
RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 124093 22945
TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 10100 17344 39000
STATE SECTOR
HYDRO POWER (122 Stns) ITANAGAR GOVT OF ARUNACHAL
PRADESHHYDRO-HYDRO 6971 6217270
24600
KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39514 17337
LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 82327 36810
NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 33318 48290
MYNTRIANG SHEP ST II ASSAM POWER GENCO HYDRO-HYDRO 300 567 35776
LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 9130 49200
LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 012 49200
DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 022 49200
TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 000 49200
UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 4990 16000
UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 6476 37000
UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 16494 14600
UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 3600 9556 15000
SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 758 8000
MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44070 44800
KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 154 41400
TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 091 41400
MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 411 41400
MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 394 41400
KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 760 41400
SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 3264 41400
LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 044 41400
BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 18953 28000
ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 43585 28200
GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 4080 11100
Note
LIG Lignite N Naptha WHR Waste Heat Recovery
Page 41
SN Contents Page
1 Rate of sale of power for the year 2016-17 33-41
RATE OF SALE OF POWER FOR THE YEAR 2016-17
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) NORTHERN REGION
CENTRAL SECTOR
BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 18000 66900 19800
CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 54000 222400 21600
CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 30000 144400 19600
CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 23100 91700 42600
PARBATI - III HPS NHPC LTD HYDRO-HYDRO 52000 68200 54800
DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 28000 95600 30000
CHUTAK NHPC LTD HYDRO-HYDRO 4400 22000 79800
DULHASTI HPS NHPC LTD HYDRO-HYDRO 39000 228000 56400
SALAL HPS NHPC LTD HYDRO-HYDRO 69000 342300 11000
TANAKPUR HPS NHPC LTD HYDRO-HYDRO 9420 43000 29600
URI HPS -I NHPC LTD HYDRO-HYDRO 48000 280300 16000
URI HPS - II NHPC LTD HYDRO-HYDRO 24000 147300 48600
NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 4500 24600 88200
SEWA - II NHPC LTD HYDRO-HYDRO 12000 47100 43400
ANTA CCPP NTPC LTD THERMAL-GASN 41930 67539 32400
AURAIYA CCPP NTPC LTD THERMAL-GASN 66336 53501 39100
BADARPUR TPS NTPC LTD THERMAL-COAL 70500 159153 44800
DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 84000 296170 42300
DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 98000 526686 46300
DADRI CCPP NTPC LTD THERMAL-GASHSD 82978 227469 33000
FARIDABAD CCPP NTPC LTD THERMAL-GASN 43159 115577 30800
RIHAND STPS I NTPC LTD THERMAL-COAL 100000 596766 24500
RIHAND STPS II NTPC LTD THERMAL-COAL 100000 737069 24600
RIHAND STPS III NTPC LTD THERMAL-COAL 100000 706546 30600
SINGRAULI STPS NTPC LTD THERMAL-COAL 200000 1394068 20400
TANDA TPS NTPC LTD THERMAL-COAL 44000 295438 40800
UNCHAHAR TPS I NTPC LTD THERMAL-COAL 42000 256454 39800
UNCHAHAR TPS II NTPC LTD THERMAL-COAL 42000 273577 38900
UNCHAHAR TPS III NTPC LTD THERMAL-COAL 21000 142780 43000
KOLDAM NTPC LTD HYDRO-HYDRO 80000 363260 43600
NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 303575 25841
RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 108000 668677 35374
NJHPS SJVNL HYDRO-HYDRO 150000 699496 23820
RAMPUR HPS SJVNL HYDRO-HYDRO 41202 195982 32260
TEHRI HPP THDC HYDRO-HYDRO 100000 272543 51800
KOTESHWAR HEP THDC HYDRO-HYDRO 40000 106244 53400
IGSTPS JHAJJAR ARAVALI P CPL THERMAL-COAL 150000 510429 49490
NEYVELI BARSINGSAR NEYVELI LIG CORP LTD THERMAL-LIG 25000 127520 38040
STATE SECTOR
PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 21000 14222 48200
PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 21000 19205 48400
PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 25000 102257 42600
PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 25000 62107 41800
DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 60000 312213 41000
RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 120000 35767442200
WYC HYDEL STATION HPGCL HYDRO-HYDRO 6240 20365 24900
GIRI POWER HOUSE HPSEB HYDRO-HYDRO 6000 13958 7600
ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 1695 5467 11900
BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 12000 18528 6700
GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 2250 7462 22500
BASSI POWER HOUSE HPSEB HYDRO-HYDRO 6600 29649 7500
BINWA POWER HOUSE HPSEB HYDRO-HYDRO 600 2749 19300
ANNEXURE-I
RATE OF SALE OF POWER FOR THE YEAR 2016-2017
Page 33
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) GAJ POWER HOUSE HPSEB HYDRO-HYDRO 1050 2914 26700
BANER POWER HOUSE HPSEB HYDRO-HYDRO 1200 2864 16200
HOLI POWER HOUSE HPSEB HYDRO-HYDRO 300 616 22500
THIROT POWER HOUSE HPSEB HYDRO-HYDRO 450 1126 22500
KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 1200 3064 22500
LARJI POWER HOUSE HPSEB HYDRO-HYDRO 12600 53677 23700
NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 250 750 31000
CHABA POWER HOUSE HPSEB HYDRO-HYDRO 175 465 23300
RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 150 101 13400
SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 200 000 22500
KILLAR HPSEB HYDRO-HYDRO 030 050 22500
BHABA AUGUMENP H HPSEB HYDRO-HYDRO 450 1276 22500
BS CHAMBA HPSEB HYDRO-HYDRO 045 099 19500
GUMMA HPSEB HYDRO-HYDRO 300 423 22500
GAS TURBINE POWER STATION IPGCL THERMAL-GAS 27000 67233 39300
PPS-I PPCL THERMAL-GAS 33000 175905 38300
PPS-III PPCL THERMAL-GAS 137120 196879 36100
LOWER JHELUM JampKPDD HYDRO-HYDRO 10500 60214 5100
UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 2260 10514 6300
UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 10500 44202 8500
GANDHARBAL JampKPDD HYDRO-HYDRO 1500 8925 4700
KARNAH MPH JampKPDD HYDRO-HYDRO 200 1122 31000
CHENANI I JampKPDD HYDRO-HYDRO 2330 10892 6600
CHENANI II JampKPDD HYDRO-HYDRO 200 1188 9300
CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 750 3634 14200
IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 375 2108 18500
IGO MERCHELLONG JampKPDD HYDRO-HYDRO 300 1572 29700
PAHALGAM MHP JampKPDD HYDRO-HYDRO 450 1713 32900
MARPACHOO JampKPDD HYDRO-HYDRO 075 375 29800
HAFTAL JampKPDD HYDRO-HYDRO 100 483 28700
SANJAK JampKPDD HYDRO-HYDRO 126 441 36000
SEWA-III JampKPDD HYDRO-HYDRO 900 3273 20200
BHADERWAH JampKPDD HYDRO-HYDRO 150 935 8900
BAZGO JampKPDD HYDRO-HYDRO 030 108 33300
SUMOOR JampKPDD HYDRO-HYDRO 010 045 35400
HUNDER JampKPDD HYDRO-HYDRO 040 176 26200
STAKNA JampKPDD HYDRO-HYDRO 400 1933 4100
KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 124000 662879 31360
SURATGARH TPS RRVUNL THERMAL-COAL 150000 402328 41730
CHHABRA TPS 1amp 2 RRVUNL THERMAL-COAL 50000 305946 36700
CHHABRA TPS 3 RRVUNL THERMAL-COAL 25000 151536 36700
CHHABRA TPS 4 RRVUNL THERMAL-COAL 25000 155896 36700
RAMGARH GT POWER PROJECT RRVUNL THERMAL-COAL 22050 43177 41800
RAMGARH GAS T P PROJECT 3 RRVUNL THERMAL-GAS 5000 93615 41800
DHOLPUR C C POWER PROJECT RRVUNL THERMAL-R-LNG 33000 9486 46110
MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 14000 20855 34192
MINI MICRO HYDEL (MMH) P S RRVUNL HYDRO-HYDRO 2385 851 37800
KALISINDH TPP 1 RRVUNL THERMAL-COAL 60000 341543 45000
KALISINDH TPP 2 RRVUNL THERMAL-COAL 60000 211588 45000
KHARA HEP UPJVNL HYDRO-HYDRO 7200 26654 7200
MATATILLA HEP UPJVNL HYDRO-HYDRO 3060 12219 6500
OBRA HEP UPJVNL HYDRO-HYDRO 9900 21517 6300
RIHAND UPJVNL HYDRO-HYDRO 30000 57369 5500
ANPARA A TPS UPRVUNL THERMAL-COAL 63000 317536 27000
ANPARA B TPS UPRVUNL THERMAL-COAL 100000 705605 22700
ANPARA D UPRVUNL THERMAL-COAL 100000 300158 39800
HARDUAGANJ TPS UPRVUNL THERMAL-COAL 16500 45817 49200
HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 50000 304389 46600
OBRA A TPS UPRVUNL THERMAL-COAL 28800 13158 34000
OBRA B TPS UPRVUNL THERMAL-COAL 100000 328124 21900
Page 34
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) PANKI TPS UPRVUNL THERMAL-COAL 21000 66488 50300
PARICHHA TPS UPRVUNL THERMAL-COAL 22000 38762 49400
PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 42000 231931 45600
PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 50000 276722 50400
CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 24000 70845 8290
CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 14400 75366 8390
DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 3375 9595 12080
DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 5100 18701 10520
KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4140 17359 12330
KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 12000 33001 9420
KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 3000 11953 8320
TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 9000 33983 12460
MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 30400 124510 16110
RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 19800 17897 10550
MPUR UTTARAKHAND JVNL HYDRO-HYDRO 930 5121 19200
PATHRI UTTARAKHAND JVNL HYDRO-HYDRO 2040 11636 14200
GALOGI UTTARAKHAND JVNL HYDRO-HYDRO 300 648 12500
PRIVATE SECTOR
MGTPP CLP INDIA PVT LTD THERMAL-COAL 132000 268902 41940
SHRINAGAR HEP ALAKNANDA HPCL HYDRO-HYDRO 33000 127414 48800
GAMA INFRAPROP CCPP GAMA INFRAPROP PVT THERMAL-GAS 22500 52686 47000
PPGCL (BARA) JP POWER VENTURES LTD THERMAL-COAL 198000 448200 38500
MALANA HEP MALANA PCL HYDRO-HYDRO 8600 26354 29792
MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 10000 30369 32580
ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 19200 56347 36079
KASHANG HEP H P PCL HYDRO-HYDRO 19500 5034 29200
BASPA-II HEP HBPCL HYDRO-HYDRO 30000 132769 13600
KARCHAM WANGTOO HEP HBPCL HYDRO-HYDRO 100000 434386 36600
RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 108000 582600 43700
RITHALA COMBI CY POWER PLANT TATA POWER DDL THERMAL-GAS 9480 000 11900
RAJPURA TPS NABHA POWER LTD THERMAL-GAS 140000 901484 39000
TALWANDI SABO POWER LTD TALWANDI SABO POWER LTD THERMAL-COAL 198000 636040 49548
ROJA THERMAL POWER STATION ROJA POWER SCL THERMAL-COAL 120000 727200 43400
KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 34400 63400
BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 36000 62600
MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 38200 60800
UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 37900 61500
KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 42300 58800
LALITPUR PGCL BAJAJ ENERGY PVT LTD THERMAL-COAL 198000 359400 47300
PRAYAGRAJ PGCL PRAYAGRAJ PGCL THERMAL-COAL 132000 448200 38595
KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 132000 783182 33438
WESTERN REGION
CENTRAL SECTOR
INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 100000 325333 23892
OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 52000 141663 34001
GANDHAR CCPP NTPC LTD THERMAL-GAS 65739 221924 28700
KAWAS CCPP NTPC LTD THERMAL-GASN 65620 167929 27000
KORBA I amp II NTPC LTD THERMAL-COAL 210000 1499171 20500
KORBA III NTPC LTD THERMAL-COAL 50000 358746 26600
SIPAT STPS I NTPC LTD THERMAL-COAL 198000 1479902 26800
SIPAT STPS II NTPC LTD THERMAL-COAL 100000 766549 26500
VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 126000 693142 25800
VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 100000 608781 23800
VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 100000 673475 27600
VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 100000 655924 32900
VINDHYACHAL STPS V NTPC LTD THERMAL-COAL 50000 328265 31700
MOUDA I NTPC LTD THERMAL-COAL 100000 343130 44500
MOUDA Ii NTPC LTD THERMAL-COAL 66000 40637 39900
RATNAGIRI GAS amp POWER PVT LTD RGPPL THERMAL-GAS 196708 442485 47000
KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 000 24729
TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 32000 201227 10740
Page 35
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 365122 19069
TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 787444 29324
STATE SECTOR
GSEG-HAZIRA15610 MW GUJARAT S ENEGEN LTD THERMAL-GAS 15610 1805 28200
GSEG-HAZIRA35143 MW GUJARAT S ENEGEN LTD THERMAL-GAS 35130 22276 51300
GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 21978 51800
AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 13929 26100
KORBA TPS EAST CSPGCL THERMAL-COAL 44000 198673 33880
DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 365808 27570
KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 316500 30420
HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 532878 19410
CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 515 58300
MTTPS CHAMPA U-I CSPGCL THERMAL-COAL 50000 220376 39000
MTTPS CHAMPA U-II CSPGCL THERMAL-COAL 50000 23709 10000
SHP GANGREL CSPGCL HYDRO-HYDRO 1000 2350 36790
BANGO HEP CSPGCL HYDRO-HYDRO 12000 14662 8900
MHP KORBA WEST CSPGCL HYDRO-HYDRO 170 859 38190
SIKASAR HEP CSPGCL HYDRO-HYDRO 700 418 26870
DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8843 74500
DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 19446 51500
GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 66388 71600
GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127488 41300
KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 96072 43900
KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 29841 56400
SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 184966 58800
UKAI 1-5 GSECL THERMAL-COAL 85000 204891 46900
UKAI TPS 6 GSECL THERMAL-COAL 50000 284448 48200
WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 271999 58300
WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 82808 44100
KADANA HPS GSECL HYDRO-HYDRO 24200 34433 16800
UKAI HPS GSECL HYDRO-HYDRO 30500 40585 6100
TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 123000 11500
BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 8900 10900
BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 7200 27500
JHINNA HPS MPPGCL HYDRO-HYDRO 2000 9700 18500
RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 44300 3400
GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 17300 4600
SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 4100 16900
MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 14600 27000
PENCH HPS MPPGCL HYDRO-HYDRO 16000 23700 8100
RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 3000 16900
AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 134400 35100
SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 283800 38700
SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 344600 34300
SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 111600 61600
SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 211800 58000
SSTPS PH-I MPPGCL THERMAL-COAL 120000 233100 84300
BHUSAWAL TPS MSPGCL THERMAL-COAL 142000 566258 51100
CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1365682 33700
KHAPERKHEDA MSPGCL THERMAL-COAL 134000 706207 39100
KORADI TPS MSPGCL THERMAL-COAL 62000 443206 42000
NASIK TPS MSPGCL THERMAL-COAL 63000 297275 47000
PARLI TPS MSPGCL THERMAL-COAL 113000 175934 71600
PARAS MSPGCL THERMAL-COAL 50000 267931 38700
URAN CCPP MSPGCL THERMAL-GAS 67200 320330 30600
KOYANA MSPGCL HYDRO-HYDRO 195600 328155 13100
SMALL HYDRO POWER PLANTS MSPGCL HYDRO-HYDRO 45400 93062 30500
BHIRA MSPGCL HYDRO-HYDRO 8000 10046 8400
TILLARI MSPGCL HYDRO-HYDRO 8900 10584 3100
SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 233298 20500
SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 87633 20500
PRIVATE SECTOR
Page 36
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 81282 46750
JNSTPP(JAYPEE NIGRIE) JP POWER VENTURES LTD THERMAL-COAL 132000 726695 29310
MB POWER MB POWER THERMAL-COAL 120000 345632 38310
ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 754922 28671
ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 780761 23495
ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 198000 1263784 32090
ADANI POWER MAHARA ADANI POWER LTD THERMAL-COAL 330000 1666191 34124
AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 170065 36827
SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 252035 45129
ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 458551 36000
ESSAR POWER MP LTD ESSAR POWER MP LTD THERMAL-COAL 60000 243040 28600
VEDANTA LTD (P P -I) VEDANTA LTD THERMAL-GAS 3000 15044 24000
VEDANTA LTD (P P -II) VEDANTA LTD THERMAL-GAS 3000 21293 24000
PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 8234600 24000
165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 5850 64390
145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 68717 40349
SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 132655 28776
SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 144686 38567
MUNDRA UMPPCOASTAL GUJARAT POWER
LTD THERMAL-IMP COAL 400000 2530300
23900
LANCO AMARKANTAK TPP PATHADIH
U-ILANCO AMARKAN POWER LTD THERMAL-COAL 30000 195500
29200
LANCO AMARKANTAK TPP PATHADIH
U-IILANCO AMARKAN POWER LTD THERMAL-COAL 30000 206900
27600
BARADARHA TPS D B POWER LTD THERMAL-COAL 120000 677373 29200
JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 405000 28900
JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 453000 40500
DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 339437 40700
TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 293400 44000
TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 137200 37000
TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 174900 44000
BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 92900 14100
BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23700 34300
KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 27600 48300
CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2530300 23900
BHANDARDRA HEP -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 2475 54900
SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 161400 26500
SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 445000 39000
SOTHERN REGION
CENTRAL SECTOR
NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 325699 54820
NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 305532 39880
NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 998805 38510
NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 113016 54070
NEYVELI TAMILNADU POWER LTD JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 625274 42200
VALLUR TPS NTPC TECL THERMAL-COAL 150000 856438 42350
R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 1493 84300
RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1502919 29400
RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 341291 31800
SIMHADRI I NTPC LTD THERMAL-COAL 100000 688382 36800
SIMHADRI II NTPC LTD THERMAL-COAL 100000 663657 43400
KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 593110 31324
MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 291625 21764
KKNPP-1 amp 2 NPCIL NUCLEAR-NUCLEAR 200000 572609 40948
MINICOY LAKSHADEEP THERMAL-DIESEL 340 770 29600
KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1097 29600
AMINI LAKSHADEEP THERMAL-DIESEL 265 509 29600
ANDROTT LAKSHADEEP THERMAL-DIESEL 219 524 29600
KALPENI LAKSHADEEP THERMAL-DIESEL 175 356 29600
AGATTI LAKSHADEEP THERMAL-DIESEL 195 658 29600
KADMAT LAKSHADEEP THERMAL-DIESEL 190 414 29600
KILTAN LAKSHADEEP THERMAL-DIESEL 150 269 29600
CHETLET LAKSHADEEP THERMAL-DIESEL 100 139 29600
BITRA LAKSHADEEP THERMAL-DIESEL 043 024 29600
BANGARAM LAKSHADEEP THERMAL-DIESEL 018 009 29600
Page 37
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) STATE SECTOR
Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 721811 46500
Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 50000 336142 46500
RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 237358 46500
RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 239926 46500
RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 124500 46500
SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 62109 46500
UPPER SILERU APGENCO HYDRO-HYDRO 24000 33000 46500
LOWER SILERU APGENCO HYDRO-HYDRO 46000 81066 46500
DONKARAI APGENCO HYDRO-HYDRO 2500 6007 46500
PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 1262 46500
CHETTIPETA APGENCO HYDRO-HYDRO 100 214 46500
MUCHKUND APGENCO HYDRO-HYDRO 12000 37571 46500
NAGARJUNASAGAR RCPH APGENCO HYDRO-HYDRO 9000 606 46500
TUNGABHADRA HES amp HAMPI(AP
Share)
APGENCO HYDRO-HYDRO 7200 6100 46500
KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 352232 42600
KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 288131 32500
KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 319272 46500
RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 40073 44300
KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 308317 46000
KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 308963 51300
SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 61004 76600
NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 17960 75300
PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 20873 58300
POCHAMPAD-I TSPGENCO HYDRO-HYDRO 2700 5455 29800
POCHAMPAD-II TSPGENCO HYDRO-HYDRO 900 1932 40700
NIZAMSAGAR TSPGENCO HYDRO-HYDRO 1000 1126 53400
RAICHUR TPS 1 to 7 KPCL THERMAL-COAL 147000 890866 43800
RAICHUR TPS 8 KPCL THERMAL-COAL 25000 159523 48200
BELLARI TPS 1 KPCL THERMAL-COAL 50000 318679 51100
BELLARI TPS 2 KPCL THERMAL-COAL 50000 232347 55600
BELLARI TPS 3 KPCL THERMAL-COAL 70000 47565 34400
BHADRA PH KPCL HYDRO-HYDRO 3920 2369 45900
GERUSUPPA PH KPCL HYDRO-HYDRO 24000 26990 22000
GHAT PRABHA HEP KPCL HYDRO-HYDRO 3200 4777 25300
KADRA HPS KPCL HYDRO-HYDRO 15000 16889 26800
NAGJHARI KPCL HYDRO-HYDRO 90000 155159 9800
KODASALLI DPH KPCL HYDRO-HYDRO 12000 14854 19200
MUNIRA+MGH+SPH+SPH KPCL HYDRO-HYDRO 22640 48211 7900
SHARAVATHY HPS KPCL HYDRO-HYDRO 108550 276215 5400
ALMATTI DPH KPCL HYDRO-HYDRO 29000 39611 24600
VARAHI UGPH KPCL HYDRO-HYDRO 46000 71368 15600
IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 17196 15300
IDUKKI HPS KSEB HYDRO-HYDRO 78000 137905 15300
KAKKAD HPS KSEB HYDRO-HYDRO 5000 13063 15300
KALLADA HPS KSEB HYDRO-HYDRO 1500 4436 15300
KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 46544 15300
KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 635 15300
LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 30822 15300
MALANKARA HPS KSEB HYDRO-HYDRO 1050 2474 15300
MATTUPETTY KSEB HYDRO-HYDRO 200 230 15300
MALAMPUZHA KSEB HYDRO-HYDRO 250 063 15300
CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 864 15300
URUMI ST I amp II KSEB HYDRO-HYDRO 615 903 15300
LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 248 15300
NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7765 19625 15300
PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 16601 15300
PANNIAR HPS KSEB HYDRO-HYDRO 3240 6217 15300
PORINGALKUTHU KSEB HYDRO-HYDRO 3600 10052 15300
PORINGALKUTHU LBE KSEB HYDRO-HYDRO 1600 9438 15300
PEPPARA KSEB HYDRO-HYDRO 300 395 15300
POOZHITHODE KSEB HYDRO-HYDRO 480 1045 15300
Page 38
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) PEECHI KSEB HYDRO-HYDRO 125 040 15300
RANI-PERUNADU KSEB HYDRO-HYDRO 400 585 15300
SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 79783 15300
SENGULAM HPS KSEB HYDRO-HYDRO 5120 11558 15300
SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 16711 15300
VILANGAD KSEB HYDRO-HYDRO 750 1578 15300
BARAPOLE KSEB HYDRO-HYDRO 1500 1932 15300
VELLATHOOVAL KSEB HYDRO-HYDRO 360 305 15300
CHIM0NY KSEB HYDRO-HYDRO 250 156 15300
ADYANPARA KSEB HYDRO-HYDRO 350 501 15300
BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 554 15300
KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 3801 15300
KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 23132 32800
ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 14416 62280
METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 523970 62280
METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 321270 62280
NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 336575 62280
NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 591240 62280
TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 508966 62280
KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 30897 62280
VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 18720 90699 62280
KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 33593 62280
BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 1047 62280
PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 1250 62280
PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 330 62280
MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 4897 62280
MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 032 62280
KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15681 62280
KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 40608 62280
KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 21342 62280
KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 4717 62280
KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4322 62280
KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2399 62280
METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 4416 62280
METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 8035 62280
BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2187 62280
BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2359 62280
BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2511 62280
BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 1949 62280
BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 1819 62280
POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 172 62280
SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 241 62280
MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 026 62280
THIRUMOORTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 136 62280
PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 9309 62280
VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 353 62280
SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 4192 62280
PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 6571 62280
SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 1186 62280
SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6319 62280
ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 6122 62280
KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 28674 62280
SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 18381 62280
SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 4258 62280
KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 12680 62280
KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4201 62280
ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 000 62280
PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 19175 62280
AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 078 62280
BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 504 62280
BHAVANI KATTALAI (BKB)(IIIampIII BB I amp II)TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 5847 62280
PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 000 62280
Page 39
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) SRI DAMODARAM STPS APPDCL THERMAL-COAL 160000 808108 36300
PRIVATE SECTOR
KARUPPUR TANJORE LANCO TANJORE PCL THERMAL-GAS 12000 48096 28770
SIMHAPURI ENERGY LTD SIMHAPURI ENERGY LTD THERMAL-COAL 60000 143900 39100
JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 7111 45500
SBU 1 JSW ENERGY LTD
VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 26000 159100
43300
SBU 2 JSW ENERGY LTD
VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 60000 247900
42800
LANCO KPLLANCO KONDAPALLI POWER
LTDTHERMAL-GAS 36814 85060
25776
LANCO KPL STG -IILANCO KONDAPALLI POWER
LTDTHERMAL-GAS 36600 12979
46330
LANCO KPL STG -IIIALANCO KONDAPALLI POWER
LTDTHERMAL-GAS 37100 85710
46330
LANCO KPL STG -III BLANCO KONDAPALLI POWER
LTDTHERMAL-GAS 37100 43639
46330
HINDUJA NATIONAL PCL HINDUJA NATIONAL PCL THERMAL-COAL 104000 303000 38200
MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 121164 49940
UDUPI POWER COR LTD ADANI POWER LTD THERMAL-COAL 120000 754613 42500
SPECTRUM POWER GENERATION
LTD SPECTRUM PG LTD THERMAL-GASN 20525 9256812
34952
TAQA NEYVELI POWER COM PVT
LTD TAQA NEYVELI THERMAL-LIG 25000 5840
34500
ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 251000 51000
ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 207860 36800
GMR VEMAGIRI POWER GENERATION
LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 30117
46450
EASTERN REGION
CENTRAL SECTOR
MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 64675 53113
MTPS STAGE - II KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 39000 1432 69138
BOKARO `B` TPS DVC THERMAL-COAL 63000 145670 31539
MEJIA TPS U 1-3 DVC THERMAL-COAL 63000 348298 31552
MEJIA TPS U 4 DVC THERMAL-COAL 21000 116099 34997
MEJIA TPS U 5-6 DVC THERMAL-COAL 50000 276427 35976
MEJIA TPS U 7-8 DVC THERMAL-COAL 100000 552854 36991
DURGAPUR STEEL TPS DVC THERMAL-COAL 100000 665550 39323
DURGAPUR TPS DVC THERMAL-COAL 21000 59270 35416
RAGHUNATHPUR TPS DVC THERMAL-COAL 120000 201650 35326
MAITHON HYDEL STA DVC HYDRO-HYDRO 6320 12200 17984
CHANDRAPURA TPSU1-3 DVC THERMAL-COAL 42000 257610 35095
CHANDRAPURA TPSU7-8 DVC THERMAL-COAL 50000 306673 34987
KODERMA TPS DVC THERMAL-COAL 100000 380180 38131
PANCHET HPS DVC HYDRO-HYDRO 8000 13360 17984
TILLAYA HPS DVC HYDRO-HYDRO 400 1410 17984
RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34700 35400
TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 277300 23200
TLDP -III NHPC LTD HYDRO-HYDRO 13200 55400 62000
TLDP -IV NHPC LTD HYDRO-HYDRO 16000 60300 25600
FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 957219 33700
FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 308943 41000
BONGAINGAON TPS NTPC LTD THERMAL-COAL 25000 153663 58600
KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 542277 34200
KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 942591 34200
BARH-II NTPC LTD THERMAL-COAL 132000 728021 44500
TALCHER TPS NTPC LTD THERMAL-COAL 46000 335521 30100
TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 702319 25600
TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1436521 24700
STATE SECTOR
BTPS(RampM) BIHAR STATE PGCL THERMAL-COAL 22000 12142 39700
BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 98331 10602
HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 50593 9482
CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 19689 2605
RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 53192 6033
UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 147208 14637
Page 40
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 60353 4519
IB TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 288567 25000
J P H GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 210 038 61100
MEYONG CHU GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 400 1086 61100
TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 122667 38200
DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 214339 43321
KOLAGHAT THERMAL POWER
STATION
WEST BENGAL PDCL THERMAL-COAL 126000 538269 31603
BAKRESHWAR THERMAL POWER
PLANT
WEST BENGAL PDCL THERMAL-COAL 105000 634876 32154
BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 45000 166855 33299
SANTHALDIH THERMAL POWER
STATION
WEST BENGAL PDCL THERMAL-COAL 50000 336442 34932
SAGARDIGHI THERMAL POWER
PROJECT
WEST BENGAL PDCL THERMAL-COAL 160000 423121 34705
JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 20344 68900
RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 24559 68900
TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 4623 68900
PURULIA PUMPED STORAGE
PROJECT
WEST BENGAL SEDCL HYDRO-HYDRO 90000 108816 68900
MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2768 68900
PRIVATE SECTOR
CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 49474 20230
CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 555500 70200
HALDIA ENERGY HALDIA ENERGY LTD THERMAL-COAL 60000 371000 50400
DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3688 63400
KAMALANGA TPS GMR KAMALANGA ENERGY LTD THERMAL-COAL 105000547670
33300
ADHUNIK POWER U-1 ADHUNIK POWER THERMAL-COAL 27000 158 44060
ADHUNIK POWER U-2 ADHUNIK POWER THERMAL-COAL 27000 168 44250
VL-JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 332800 23622
JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 43000 45250
JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 71700 37030
JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 70700 35920
JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 71100 38870
JOJOBERA UNIT 5 TATA POWER COM LTD THERMAL-COAL 12000 79300 44560
JOJOBERA UNIT 6 TATA POWER COM LTD THERMAL-WHR 12000 83700 12840
IEL KALINGANAGAR U-I TATA POWER COM LTD THERMAL-WG 6750 33400 22500
IEL KALINGANAGAR U-II TATA POWER COM LTD THERMAL-WG 6750 34800 22500
MAITHON UNIT 1 amp 2 TATA POWER COM LTD THERMAL-COAL 105000 678000 36100
HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 27500 24340
HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 28400 24340
HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 15800 24310
NORTH EASTERN REGION
CENTRAL SECTOR
LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 74100 36600
AGARTALA GT NEEPCO THERMAL-GAS 13500 88611 27210
ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 153111 32310
DOYANG HEP NEEPCO HYDRO-HYDRO 7500 25598 49801
KOPILI HEP NEEPCO HYDRO-HYDRO 20000 98186 11491
KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 19582 20237
KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 10310 17968
RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 124093 22945
TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 10100 17344 39000
STATE SECTOR
HYDRO POWER (122 Stns) ITANAGAR GOVT OF ARUNACHAL
PRADESHHYDRO-HYDRO 6971 6217270
24600
KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39514 17337
LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 82327 36810
NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 33318 48290
MYNTRIANG SHEP ST II ASSAM POWER GENCO HYDRO-HYDRO 300 567 35776
LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 9130 49200
LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 012 49200
DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 022 49200
TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 000 49200
UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 4990 16000
UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 6476 37000
UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 16494 14600
UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 3600 9556 15000
SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 758 8000
MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44070 44800
KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 154 41400
TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 091 41400
MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 411 41400
MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 394 41400
KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 760 41400
SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 3264 41400
LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 044 41400
BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 18953 28000
ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 43585 28200
GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 4080 11100
Note
LIG Lignite N Naptha WHR Waste Heat Recovery
Page 41
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) NORTHERN REGION
CENTRAL SECTOR
BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 18000 66900 19800
CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 54000 222400 21600
CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 30000 144400 19600
CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 23100 91700 42600
PARBATI - III HPS NHPC LTD HYDRO-HYDRO 52000 68200 54800
DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 28000 95600 30000
CHUTAK NHPC LTD HYDRO-HYDRO 4400 22000 79800
DULHASTI HPS NHPC LTD HYDRO-HYDRO 39000 228000 56400
SALAL HPS NHPC LTD HYDRO-HYDRO 69000 342300 11000
TANAKPUR HPS NHPC LTD HYDRO-HYDRO 9420 43000 29600
URI HPS -I NHPC LTD HYDRO-HYDRO 48000 280300 16000
URI HPS - II NHPC LTD HYDRO-HYDRO 24000 147300 48600
NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 4500 24600 88200
SEWA - II NHPC LTD HYDRO-HYDRO 12000 47100 43400
ANTA CCPP NTPC LTD THERMAL-GASN 41930 67539 32400
AURAIYA CCPP NTPC LTD THERMAL-GASN 66336 53501 39100
BADARPUR TPS NTPC LTD THERMAL-COAL 70500 159153 44800
DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 84000 296170 42300
DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 98000 526686 46300
DADRI CCPP NTPC LTD THERMAL-GASHSD 82978 227469 33000
FARIDABAD CCPP NTPC LTD THERMAL-GASN 43159 115577 30800
RIHAND STPS I NTPC LTD THERMAL-COAL 100000 596766 24500
RIHAND STPS II NTPC LTD THERMAL-COAL 100000 737069 24600
RIHAND STPS III NTPC LTD THERMAL-COAL 100000 706546 30600
SINGRAULI STPS NTPC LTD THERMAL-COAL 200000 1394068 20400
TANDA TPS NTPC LTD THERMAL-COAL 44000 295438 40800
UNCHAHAR TPS I NTPC LTD THERMAL-COAL 42000 256454 39800
UNCHAHAR TPS II NTPC LTD THERMAL-COAL 42000 273577 38900
UNCHAHAR TPS III NTPC LTD THERMAL-COAL 21000 142780 43000
KOLDAM NTPC LTD HYDRO-HYDRO 80000 363260 43600
NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 303575 25841
RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 108000 668677 35374
NJHPS SJVNL HYDRO-HYDRO 150000 699496 23820
RAMPUR HPS SJVNL HYDRO-HYDRO 41202 195982 32260
TEHRI HPP THDC HYDRO-HYDRO 100000 272543 51800
KOTESHWAR HEP THDC HYDRO-HYDRO 40000 106244 53400
IGSTPS JHAJJAR ARAVALI P CPL THERMAL-COAL 150000 510429 49490
NEYVELI BARSINGSAR NEYVELI LIG CORP LTD THERMAL-LIG 25000 127520 38040
STATE SECTOR
PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 21000 14222 48200
PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 21000 19205 48400
PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 25000 102257 42600
PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 25000 62107 41800
DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 60000 312213 41000
RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 120000 35767442200
WYC HYDEL STATION HPGCL HYDRO-HYDRO 6240 20365 24900
GIRI POWER HOUSE HPSEB HYDRO-HYDRO 6000 13958 7600
ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 1695 5467 11900
BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 12000 18528 6700
GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 2250 7462 22500
BASSI POWER HOUSE HPSEB HYDRO-HYDRO 6600 29649 7500
BINWA POWER HOUSE HPSEB HYDRO-HYDRO 600 2749 19300
ANNEXURE-I
RATE OF SALE OF POWER FOR THE YEAR 2016-2017
Page 33
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) GAJ POWER HOUSE HPSEB HYDRO-HYDRO 1050 2914 26700
BANER POWER HOUSE HPSEB HYDRO-HYDRO 1200 2864 16200
HOLI POWER HOUSE HPSEB HYDRO-HYDRO 300 616 22500
THIROT POWER HOUSE HPSEB HYDRO-HYDRO 450 1126 22500
KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 1200 3064 22500
LARJI POWER HOUSE HPSEB HYDRO-HYDRO 12600 53677 23700
NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 250 750 31000
CHABA POWER HOUSE HPSEB HYDRO-HYDRO 175 465 23300
RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 150 101 13400
SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 200 000 22500
KILLAR HPSEB HYDRO-HYDRO 030 050 22500
BHABA AUGUMENP H HPSEB HYDRO-HYDRO 450 1276 22500
BS CHAMBA HPSEB HYDRO-HYDRO 045 099 19500
GUMMA HPSEB HYDRO-HYDRO 300 423 22500
GAS TURBINE POWER STATION IPGCL THERMAL-GAS 27000 67233 39300
PPS-I PPCL THERMAL-GAS 33000 175905 38300
PPS-III PPCL THERMAL-GAS 137120 196879 36100
LOWER JHELUM JampKPDD HYDRO-HYDRO 10500 60214 5100
UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 2260 10514 6300
UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 10500 44202 8500
GANDHARBAL JampKPDD HYDRO-HYDRO 1500 8925 4700
KARNAH MPH JampKPDD HYDRO-HYDRO 200 1122 31000
CHENANI I JampKPDD HYDRO-HYDRO 2330 10892 6600
CHENANI II JampKPDD HYDRO-HYDRO 200 1188 9300
CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 750 3634 14200
IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 375 2108 18500
IGO MERCHELLONG JampKPDD HYDRO-HYDRO 300 1572 29700
PAHALGAM MHP JampKPDD HYDRO-HYDRO 450 1713 32900
MARPACHOO JampKPDD HYDRO-HYDRO 075 375 29800
HAFTAL JampKPDD HYDRO-HYDRO 100 483 28700
SANJAK JampKPDD HYDRO-HYDRO 126 441 36000
SEWA-III JampKPDD HYDRO-HYDRO 900 3273 20200
BHADERWAH JampKPDD HYDRO-HYDRO 150 935 8900
BAZGO JampKPDD HYDRO-HYDRO 030 108 33300
SUMOOR JampKPDD HYDRO-HYDRO 010 045 35400
HUNDER JampKPDD HYDRO-HYDRO 040 176 26200
STAKNA JampKPDD HYDRO-HYDRO 400 1933 4100
KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 124000 662879 31360
SURATGARH TPS RRVUNL THERMAL-COAL 150000 402328 41730
CHHABRA TPS 1amp 2 RRVUNL THERMAL-COAL 50000 305946 36700
CHHABRA TPS 3 RRVUNL THERMAL-COAL 25000 151536 36700
CHHABRA TPS 4 RRVUNL THERMAL-COAL 25000 155896 36700
RAMGARH GT POWER PROJECT RRVUNL THERMAL-COAL 22050 43177 41800
RAMGARH GAS T P PROJECT 3 RRVUNL THERMAL-GAS 5000 93615 41800
DHOLPUR C C POWER PROJECT RRVUNL THERMAL-R-LNG 33000 9486 46110
MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 14000 20855 34192
MINI MICRO HYDEL (MMH) P S RRVUNL HYDRO-HYDRO 2385 851 37800
KALISINDH TPP 1 RRVUNL THERMAL-COAL 60000 341543 45000
KALISINDH TPP 2 RRVUNL THERMAL-COAL 60000 211588 45000
KHARA HEP UPJVNL HYDRO-HYDRO 7200 26654 7200
MATATILLA HEP UPJVNL HYDRO-HYDRO 3060 12219 6500
OBRA HEP UPJVNL HYDRO-HYDRO 9900 21517 6300
RIHAND UPJVNL HYDRO-HYDRO 30000 57369 5500
ANPARA A TPS UPRVUNL THERMAL-COAL 63000 317536 27000
ANPARA B TPS UPRVUNL THERMAL-COAL 100000 705605 22700
ANPARA D UPRVUNL THERMAL-COAL 100000 300158 39800
HARDUAGANJ TPS UPRVUNL THERMAL-COAL 16500 45817 49200
HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 50000 304389 46600
OBRA A TPS UPRVUNL THERMAL-COAL 28800 13158 34000
OBRA B TPS UPRVUNL THERMAL-COAL 100000 328124 21900
Page 34
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) PANKI TPS UPRVUNL THERMAL-COAL 21000 66488 50300
PARICHHA TPS UPRVUNL THERMAL-COAL 22000 38762 49400
PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 42000 231931 45600
PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 50000 276722 50400
CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 24000 70845 8290
CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 14400 75366 8390
DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 3375 9595 12080
DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 5100 18701 10520
KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4140 17359 12330
KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 12000 33001 9420
KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 3000 11953 8320
TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 9000 33983 12460
MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 30400 124510 16110
RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 19800 17897 10550
MPUR UTTARAKHAND JVNL HYDRO-HYDRO 930 5121 19200
PATHRI UTTARAKHAND JVNL HYDRO-HYDRO 2040 11636 14200
GALOGI UTTARAKHAND JVNL HYDRO-HYDRO 300 648 12500
PRIVATE SECTOR
MGTPP CLP INDIA PVT LTD THERMAL-COAL 132000 268902 41940
SHRINAGAR HEP ALAKNANDA HPCL HYDRO-HYDRO 33000 127414 48800
GAMA INFRAPROP CCPP GAMA INFRAPROP PVT THERMAL-GAS 22500 52686 47000
PPGCL (BARA) JP POWER VENTURES LTD THERMAL-COAL 198000 448200 38500
MALANA HEP MALANA PCL HYDRO-HYDRO 8600 26354 29792
MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 10000 30369 32580
ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 19200 56347 36079
KASHANG HEP H P PCL HYDRO-HYDRO 19500 5034 29200
BASPA-II HEP HBPCL HYDRO-HYDRO 30000 132769 13600
KARCHAM WANGTOO HEP HBPCL HYDRO-HYDRO 100000 434386 36600
RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 108000 582600 43700
RITHALA COMBI CY POWER PLANT TATA POWER DDL THERMAL-GAS 9480 000 11900
RAJPURA TPS NABHA POWER LTD THERMAL-GAS 140000 901484 39000
TALWANDI SABO POWER LTD TALWANDI SABO POWER LTD THERMAL-COAL 198000 636040 49548
ROJA THERMAL POWER STATION ROJA POWER SCL THERMAL-COAL 120000 727200 43400
KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 34400 63400
BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 36000 62600
MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 38200 60800
UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 37900 61500
KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 42300 58800
LALITPUR PGCL BAJAJ ENERGY PVT LTD THERMAL-COAL 198000 359400 47300
PRAYAGRAJ PGCL PRAYAGRAJ PGCL THERMAL-COAL 132000 448200 38595
KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 132000 783182 33438
WESTERN REGION
CENTRAL SECTOR
INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 100000 325333 23892
OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 52000 141663 34001
GANDHAR CCPP NTPC LTD THERMAL-GAS 65739 221924 28700
KAWAS CCPP NTPC LTD THERMAL-GASN 65620 167929 27000
KORBA I amp II NTPC LTD THERMAL-COAL 210000 1499171 20500
KORBA III NTPC LTD THERMAL-COAL 50000 358746 26600
SIPAT STPS I NTPC LTD THERMAL-COAL 198000 1479902 26800
SIPAT STPS II NTPC LTD THERMAL-COAL 100000 766549 26500
VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 126000 693142 25800
VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 100000 608781 23800
VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 100000 673475 27600
VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 100000 655924 32900
VINDHYACHAL STPS V NTPC LTD THERMAL-COAL 50000 328265 31700
MOUDA I NTPC LTD THERMAL-COAL 100000 343130 44500
MOUDA Ii NTPC LTD THERMAL-COAL 66000 40637 39900
RATNAGIRI GAS amp POWER PVT LTD RGPPL THERMAL-GAS 196708 442485 47000
KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 000 24729
TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 32000 201227 10740
Page 35
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 365122 19069
TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 787444 29324
STATE SECTOR
GSEG-HAZIRA15610 MW GUJARAT S ENEGEN LTD THERMAL-GAS 15610 1805 28200
GSEG-HAZIRA35143 MW GUJARAT S ENEGEN LTD THERMAL-GAS 35130 22276 51300
GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 21978 51800
AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 13929 26100
KORBA TPS EAST CSPGCL THERMAL-COAL 44000 198673 33880
DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 365808 27570
KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 316500 30420
HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 532878 19410
CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 515 58300
MTTPS CHAMPA U-I CSPGCL THERMAL-COAL 50000 220376 39000
MTTPS CHAMPA U-II CSPGCL THERMAL-COAL 50000 23709 10000
SHP GANGREL CSPGCL HYDRO-HYDRO 1000 2350 36790
BANGO HEP CSPGCL HYDRO-HYDRO 12000 14662 8900
MHP KORBA WEST CSPGCL HYDRO-HYDRO 170 859 38190
SIKASAR HEP CSPGCL HYDRO-HYDRO 700 418 26870
DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8843 74500
DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 19446 51500
GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 66388 71600
GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127488 41300
KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 96072 43900
KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 29841 56400
SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 184966 58800
UKAI 1-5 GSECL THERMAL-COAL 85000 204891 46900
UKAI TPS 6 GSECL THERMAL-COAL 50000 284448 48200
WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 271999 58300
WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 82808 44100
KADANA HPS GSECL HYDRO-HYDRO 24200 34433 16800
UKAI HPS GSECL HYDRO-HYDRO 30500 40585 6100
TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 123000 11500
BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 8900 10900
BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 7200 27500
JHINNA HPS MPPGCL HYDRO-HYDRO 2000 9700 18500
RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 44300 3400
GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 17300 4600
SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 4100 16900
MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 14600 27000
PENCH HPS MPPGCL HYDRO-HYDRO 16000 23700 8100
RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 3000 16900
AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 134400 35100
SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 283800 38700
SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 344600 34300
SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 111600 61600
SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 211800 58000
SSTPS PH-I MPPGCL THERMAL-COAL 120000 233100 84300
BHUSAWAL TPS MSPGCL THERMAL-COAL 142000 566258 51100
CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1365682 33700
KHAPERKHEDA MSPGCL THERMAL-COAL 134000 706207 39100
KORADI TPS MSPGCL THERMAL-COAL 62000 443206 42000
NASIK TPS MSPGCL THERMAL-COAL 63000 297275 47000
PARLI TPS MSPGCL THERMAL-COAL 113000 175934 71600
PARAS MSPGCL THERMAL-COAL 50000 267931 38700
URAN CCPP MSPGCL THERMAL-GAS 67200 320330 30600
KOYANA MSPGCL HYDRO-HYDRO 195600 328155 13100
SMALL HYDRO POWER PLANTS MSPGCL HYDRO-HYDRO 45400 93062 30500
BHIRA MSPGCL HYDRO-HYDRO 8000 10046 8400
TILLARI MSPGCL HYDRO-HYDRO 8900 10584 3100
SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 233298 20500
SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 87633 20500
PRIVATE SECTOR
Page 36
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 81282 46750
JNSTPP(JAYPEE NIGRIE) JP POWER VENTURES LTD THERMAL-COAL 132000 726695 29310
MB POWER MB POWER THERMAL-COAL 120000 345632 38310
ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 754922 28671
ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 780761 23495
ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 198000 1263784 32090
ADANI POWER MAHARA ADANI POWER LTD THERMAL-COAL 330000 1666191 34124
AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 170065 36827
SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 252035 45129
ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 458551 36000
ESSAR POWER MP LTD ESSAR POWER MP LTD THERMAL-COAL 60000 243040 28600
VEDANTA LTD (P P -I) VEDANTA LTD THERMAL-GAS 3000 15044 24000
VEDANTA LTD (P P -II) VEDANTA LTD THERMAL-GAS 3000 21293 24000
PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 8234600 24000
165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 5850 64390
145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 68717 40349
SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 132655 28776
SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 144686 38567
MUNDRA UMPPCOASTAL GUJARAT POWER
LTD THERMAL-IMP COAL 400000 2530300
23900
LANCO AMARKANTAK TPP PATHADIH
U-ILANCO AMARKAN POWER LTD THERMAL-COAL 30000 195500
29200
LANCO AMARKANTAK TPP PATHADIH
U-IILANCO AMARKAN POWER LTD THERMAL-COAL 30000 206900
27600
BARADARHA TPS D B POWER LTD THERMAL-COAL 120000 677373 29200
JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 405000 28900
JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 453000 40500
DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 339437 40700
TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 293400 44000
TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 137200 37000
TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 174900 44000
BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 92900 14100
BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23700 34300
KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 27600 48300
CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2530300 23900
BHANDARDRA HEP -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 2475 54900
SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 161400 26500
SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 445000 39000
SOTHERN REGION
CENTRAL SECTOR
NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 325699 54820
NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 305532 39880
NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 998805 38510
NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 113016 54070
NEYVELI TAMILNADU POWER LTD JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 625274 42200
VALLUR TPS NTPC TECL THERMAL-COAL 150000 856438 42350
R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 1493 84300
RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1502919 29400
RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 341291 31800
SIMHADRI I NTPC LTD THERMAL-COAL 100000 688382 36800
SIMHADRI II NTPC LTD THERMAL-COAL 100000 663657 43400
KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 593110 31324
MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 291625 21764
KKNPP-1 amp 2 NPCIL NUCLEAR-NUCLEAR 200000 572609 40948
MINICOY LAKSHADEEP THERMAL-DIESEL 340 770 29600
KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1097 29600
AMINI LAKSHADEEP THERMAL-DIESEL 265 509 29600
ANDROTT LAKSHADEEP THERMAL-DIESEL 219 524 29600
KALPENI LAKSHADEEP THERMAL-DIESEL 175 356 29600
AGATTI LAKSHADEEP THERMAL-DIESEL 195 658 29600
KADMAT LAKSHADEEP THERMAL-DIESEL 190 414 29600
KILTAN LAKSHADEEP THERMAL-DIESEL 150 269 29600
CHETLET LAKSHADEEP THERMAL-DIESEL 100 139 29600
BITRA LAKSHADEEP THERMAL-DIESEL 043 024 29600
BANGARAM LAKSHADEEP THERMAL-DIESEL 018 009 29600
Page 37
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) STATE SECTOR
Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 721811 46500
Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 50000 336142 46500
RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 237358 46500
RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 239926 46500
RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 124500 46500
SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 62109 46500
UPPER SILERU APGENCO HYDRO-HYDRO 24000 33000 46500
LOWER SILERU APGENCO HYDRO-HYDRO 46000 81066 46500
DONKARAI APGENCO HYDRO-HYDRO 2500 6007 46500
PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 1262 46500
CHETTIPETA APGENCO HYDRO-HYDRO 100 214 46500
MUCHKUND APGENCO HYDRO-HYDRO 12000 37571 46500
NAGARJUNASAGAR RCPH APGENCO HYDRO-HYDRO 9000 606 46500
TUNGABHADRA HES amp HAMPI(AP
Share)
APGENCO HYDRO-HYDRO 7200 6100 46500
KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 352232 42600
KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 288131 32500
KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 319272 46500
RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 40073 44300
KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 308317 46000
KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 308963 51300
SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 61004 76600
NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 17960 75300
PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 20873 58300
POCHAMPAD-I TSPGENCO HYDRO-HYDRO 2700 5455 29800
POCHAMPAD-II TSPGENCO HYDRO-HYDRO 900 1932 40700
NIZAMSAGAR TSPGENCO HYDRO-HYDRO 1000 1126 53400
RAICHUR TPS 1 to 7 KPCL THERMAL-COAL 147000 890866 43800
RAICHUR TPS 8 KPCL THERMAL-COAL 25000 159523 48200
BELLARI TPS 1 KPCL THERMAL-COAL 50000 318679 51100
BELLARI TPS 2 KPCL THERMAL-COAL 50000 232347 55600
BELLARI TPS 3 KPCL THERMAL-COAL 70000 47565 34400
BHADRA PH KPCL HYDRO-HYDRO 3920 2369 45900
GERUSUPPA PH KPCL HYDRO-HYDRO 24000 26990 22000
GHAT PRABHA HEP KPCL HYDRO-HYDRO 3200 4777 25300
KADRA HPS KPCL HYDRO-HYDRO 15000 16889 26800
NAGJHARI KPCL HYDRO-HYDRO 90000 155159 9800
KODASALLI DPH KPCL HYDRO-HYDRO 12000 14854 19200
MUNIRA+MGH+SPH+SPH KPCL HYDRO-HYDRO 22640 48211 7900
SHARAVATHY HPS KPCL HYDRO-HYDRO 108550 276215 5400
ALMATTI DPH KPCL HYDRO-HYDRO 29000 39611 24600
VARAHI UGPH KPCL HYDRO-HYDRO 46000 71368 15600
IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 17196 15300
IDUKKI HPS KSEB HYDRO-HYDRO 78000 137905 15300
KAKKAD HPS KSEB HYDRO-HYDRO 5000 13063 15300
KALLADA HPS KSEB HYDRO-HYDRO 1500 4436 15300
KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 46544 15300
KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 635 15300
LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 30822 15300
MALANKARA HPS KSEB HYDRO-HYDRO 1050 2474 15300
MATTUPETTY KSEB HYDRO-HYDRO 200 230 15300
MALAMPUZHA KSEB HYDRO-HYDRO 250 063 15300
CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 864 15300
URUMI ST I amp II KSEB HYDRO-HYDRO 615 903 15300
LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 248 15300
NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7765 19625 15300
PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 16601 15300
PANNIAR HPS KSEB HYDRO-HYDRO 3240 6217 15300
PORINGALKUTHU KSEB HYDRO-HYDRO 3600 10052 15300
PORINGALKUTHU LBE KSEB HYDRO-HYDRO 1600 9438 15300
PEPPARA KSEB HYDRO-HYDRO 300 395 15300
POOZHITHODE KSEB HYDRO-HYDRO 480 1045 15300
Page 38
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) PEECHI KSEB HYDRO-HYDRO 125 040 15300
RANI-PERUNADU KSEB HYDRO-HYDRO 400 585 15300
SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 79783 15300
SENGULAM HPS KSEB HYDRO-HYDRO 5120 11558 15300
SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 16711 15300
VILANGAD KSEB HYDRO-HYDRO 750 1578 15300
BARAPOLE KSEB HYDRO-HYDRO 1500 1932 15300
VELLATHOOVAL KSEB HYDRO-HYDRO 360 305 15300
CHIM0NY KSEB HYDRO-HYDRO 250 156 15300
ADYANPARA KSEB HYDRO-HYDRO 350 501 15300
BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 554 15300
KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 3801 15300
KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 23132 32800
ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 14416 62280
METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 523970 62280
METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 321270 62280
NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 336575 62280
NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 591240 62280
TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 508966 62280
KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 30897 62280
VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 18720 90699 62280
KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 33593 62280
BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 1047 62280
PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 1250 62280
PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 330 62280
MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 4897 62280
MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 032 62280
KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15681 62280
KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 40608 62280
KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 21342 62280
KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 4717 62280
KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4322 62280
KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2399 62280
METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 4416 62280
METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 8035 62280
BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2187 62280
BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2359 62280
BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2511 62280
BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 1949 62280
BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 1819 62280
POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 172 62280
SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 241 62280
MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 026 62280
THIRUMOORTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 136 62280
PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 9309 62280
VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 353 62280
SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 4192 62280
PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 6571 62280
SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 1186 62280
SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6319 62280
ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 6122 62280
KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 28674 62280
SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 18381 62280
SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 4258 62280
KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 12680 62280
KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4201 62280
ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 000 62280
PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 19175 62280
AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 078 62280
BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 504 62280
BHAVANI KATTALAI (BKB)(IIIampIII BB I amp II)TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 5847 62280
PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 000 62280
Page 39
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) SRI DAMODARAM STPS APPDCL THERMAL-COAL 160000 808108 36300
PRIVATE SECTOR
KARUPPUR TANJORE LANCO TANJORE PCL THERMAL-GAS 12000 48096 28770
SIMHAPURI ENERGY LTD SIMHAPURI ENERGY LTD THERMAL-COAL 60000 143900 39100
JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 7111 45500
SBU 1 JSW ENERGY LTD
VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 26000 159100
43300
SBU 2 JSW ENERGY LTD
VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 60000 247900
42800
LANCO KPLLANCO KONDAPALLI POWER
LTDTHERMAL-GAS 36814 85060
25776
LANCO KPL STG -IILANCO KONDAPALLI POWER
LTDTHERMAL-GAS 36600 12979
46330
LANCO KPL STG -IIIALANCO KONDAPALLI POWER
LTDTHERMAL-GAS 37100 85710
46330
LANCO KPL STG -III BLANCO KONDAPALLI POWER
LTDTHERMAL-GAS 37100 43639
46330
HINDUJA NATIONAL PCL HINDUJA NATIONAL PCL THERMAL-COAL 104000 303000 38200
MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 121164 49940
UDUPI POWER COR LTD ADANI POWER LTD THERMAL-COAL 120000 754613 42500
SPECTRUM POWER GENERATION
LTD SPECTRUM PG LTD THERMAL-GASN 20525 9256812
34952
TAQA NEYVELI POWER COM PVT
LTD TAQA NEYVELI THERMAL-LIG 25000 5840
34500
ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 251000 51000
ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 207860 36800
GMR VEMAGIRI POWER GENERATION
LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 30117
46450
EASTERN REGION
CENTRAL SECTOR
MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 64675 53113
MTPS STAGE - II KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 39000 1432 69138
BOKARO `B` TPS DVC THERMAL-COAL 63000 145670 31539
MEJIA TPS U 1-3 DVC THERMAL-COAL 63000 348298 31552
MEJIA TPS U 4 DVC THERMAL-COAL 21000 116099 34997
MEJIA TPS U 5-6 DVC THERMAL-COAL 50000 276427 35976
MEJIA TPS U 7-8 DVC THERMAL-COAL 100000 552854 36991
DURGAPUR STEEL TPS DVC THERMAL-COAL 100000 665550 39323
DURGAPUR TPS DVC THERMAL-COAL 21000 59270 35416
RAGHUNATHPUR TPS DVC THERMAL-COAL 120000 201650 35326
MAITHON HYDEL STA DVC HYDRO-HYDRO 6320 12200 17984
CHANDRAPURA TPSU1-3 DVC THERMAL-COAL 42000 257610 35095
CHANDRAPURA TPSU7-8 DVC THERMAL-COAL 50000 306673 34987
KODERMA TPS DVC THERMAL-COAL 100000 380180 38131
PANCHET HPS DVC HYDRO-HYDRO 8000 13360 17984
TILLAYA HPS DVC HYDRO-HYDRO 400 1410 17984
RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34700 35400
TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 277300 23200
TLDP -III NHPC LTD HYDRO-HYDRO 13200 55400 62000
TLDP -IV NHPC LTD HYDRO-HYDRO 16000 60300 25600
FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 957219 33700
FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 308943 41000
BONGAINGAON TPS NTPC LTD THERMAL-COAL 25000 153663 58600
KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 542277 34200
KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 942591 34200
BARH-II NTPC LTD THERMAL-COAL 132000 728021 44500
TALCHER TPS NTPC LTD THERMAL-COAL 46000 335521 30100
TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 702319 25600
TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1436521 24700
STATE SECTOR
BTPS(RampM) BIHAR STATE PGCL THERMAL-COAL 22000 12142 39700
BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 98331 10602
HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 50593 9482
CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 19689 2605
RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 53192 6033
UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 147208 14637
Page 40
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 60353 4519
IB TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 288567 25000
J P H GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 210 038 61100
MEYONG CHU GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 400 1086 61100
TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 122667 38200
DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 214339 43321
KOLAGHAT THERMAL POWER
STATION
WEST BENGAL PDCL THERMAL-COAL 126000 538269 31603
BAKRESHWAR THERMAL POWER
PLANT
WEST BENGAL PDCL THERMAL-COAL 105000 634876 32154
BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 45000 166855 33299
SANTHALDIH THERMAL POWER
STATION
WEST BENGAL PDCL THERMAL-COAL 50000 336442 34932
SAGARDIGHI THERMAL POWER
PROJECT
WEST BENGAL PDCL THERMAL-COAL 160000 423121 34705
JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 20344 68900
RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 24559 68900
TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 4623 68900
PURULIA PUMPED STORAGE
PROJECT
WEST BENGAL SEDCL HYDRO-HYDRO 90000 108816 68900
MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2768 68900
PRIVATE SECTOR
CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 49474 20230
CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 555500 70200
HALDIA ENERGY HALDIA ENERGY LTD THERMAL-COAL 60000 371000 50400
DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3688 63400
KAMALANGA TPS GMR KAMALANGA ENERGY LTD THERMAL-COAL 105000547670
33300
ADHUNIK POWER U-1 ADHUNIK POWER THERMAL-COAL 27000 158 44060
ADHUNIK POWER U-2 ADHUNIK POWER THERMAL-COAL 27000 168 44250
VL-JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 332800 23622
JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 43000 45250
JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 71700 37030
JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 70700 35920
JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 71100 38870
JOJOBERA UNIT 5 TATA POWER COM LTD THERMAL-COAL 12000 79300 44560
JOJOBERA UNIT 6 TATA POWER COM LTD THERMAL-WHR 12000 83700 12840
IEL KALINGANAGAR U-I TATA POWER COM LTD THERMAL-WG 6750 33400 22500
IEL KALINGANAGAR U-II TATA POWER COM LTD THERMAL-WG 6750 34800 22500
MAITHON UNIT 1 amp 2 TATA POWER COM LTD THERMAL-COAL 105000 678000 36100
HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 27500 24340
HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 28400 24340
HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 15800 24310
NORTH EASTERN REGION
CENTRAL SECTOR
LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 74100 36600
AGARTALA GT NEEPCO THERMAL-GAS 13500 88611 27210
ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 153111 32310
DOYANG HEP NEEPCO HYDRO-HYDRO 7500 25598 49801
KOPILI HEP NEEPCO HYDRO-HYDRO 20000 98186 11491
KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 19582 20237
KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 10310 17968
RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 124093 22945
TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 10100 17344 39000
STATE SECTOR
HYDRO POWER (122 Stns) ITANAGAR GOVT OF ARUNACHAL
PRADESHHYDRO-HYDRO 6971 6217270
24600
KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39514 17337
LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 82327 36810
NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 33318 48290
MYNTRIANG SHEP ST II ASSAM POWER GENCO HYDRO-HYDRO 300 567 35776
LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 9130 49200
LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 012 49200
DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 022 49200
TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 000 49200
UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 4990 16000
UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 6476 37000
UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 16494 14600
UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 3600 9556 15000
SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 758 8000
MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44070 44800
KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 154 41400
TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 091 41400
MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 411 41400
MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 394 41400
KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 760 41400
SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 3264 41400
LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 044 41400
BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 18953 28000
ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 43585 28200
GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 4080 11100
Note
LIG Lignite N Naptha WHR Waste Heat Recovery
Page 41
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) GAJ POWER HOUSE HPSEB HYDRO-HYDRO 1050 2914 26700
BANER POWER HOUSE HPSEB HYDRO-HYDRO 1200 2864 16200
HOLI POWER HOUSE HPSEB HYDRO-HYDRO 300 616 22500
THIROT POWER HOUSE HPSEB HYDRO-HYDRO 450 1126 22500
KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 1200 3064 22500
LARJI POWER HOUSE HPSEB HYDRO-HYDRO 12600 53677 23700
NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 250 750 31000
CHABA POWER HOUSE HPSEB HYDRO-HYDRO 175 465 23300
RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 150 101 13400
SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 200 000 22500
KILLAR HPSEB HYDRO-HYDRO 030 050 22500
BHABA AUGUMENP H HPSEB HYDRO-HYDRO 450 1276 22500
BS CHAMBA HPSEB HYDRO-HYDRO 045 099 19500
GUMMA HPSEB HYDRO-HYDRO 300 423 22500
GAS TURBINE POWER STATION IPGCL THERMAL-GAS 27000 67233 39300
PPS-I PPCL THERMAL-GAS 33000 175905 38300
PPS-III PPCL THERMAL-GAS 137120 196879 36100
LOWER JHELUM JampKPDD HYDRO-HYDRO 10500 60214 5100
UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 2260 10514 6300
UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 10500 44202 8500
GANDHARBAL JampKPDD HYDRO-HYDRO 1500 8925 4700
KARNAH MPH JampKPDD HYDRO-HYDRO 200 1122 31000
CHENANI I JampKPDD HYDRO-HYDRO 2330 10892 6600
CHENANI II JampKPDD HYDRO-HYDRO 200 1188 9300
CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 750 3634 14200
IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 375 2108 18500
IGO MERCHELLONG JampKPDD HYDRO-HYDRO 300 1572 29700
PAHALGAM MHP JampKPDD HYDRO-HYDRO 450 1713 32900
MARPACHOO JampKPDD HYDRO-HYDRO 075 375 29800
HAFTAL JampKPDD HYDRO-HYDRO 100 483 28700
SANJAK JampKPDD HYDRO-HYDRO 126 441 36000
SEWA-III JampKPDD HYDRO-HYDRO 900 3273 20200
BHADERWAH JampKPDD HYDRO-HYDRO 150 935 8900
BAZGO JampKPDD HYDRO-HYDRO 030 108 33300
SUMOOR JampKPDD HYDRO-HYDRO 010 045 35400
HUNDER JampKPDD HYDRO-HYDRO 040 176 26200
STAKNA JampKPDD HYDRO-HYDRO 400 1933 4100
KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 124000 662879 31360
SURATGARH TPS RRVUNL THERMAL-COAL 150000 402328 41730
CHHABRA TPS 1amp 2 RRVUNL THERMAL-COAL 50000 305946 36700
CHHABRA TPS 3 RRVUNL THERMAL-COAL 25000 151536 36700
CHHABRA TPS 4 RRVUNL THERMAL-COAL 25000 155896 36700
RAMGARH GT POWER PROJECT RRVUNL THERMAL-COAL 22050 43177 41800
RAMGARH GAS T P PROJECT 3 RRVUNL THERMAL-GAS 5000 93615 41800
DHOLPUR C C POWER PROJECT RRVUNL THERMAL-R-LNG 33000 9486 46110
MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 14000 20855 34192
MINI MICRO HYDEL (MMH) P S RRVUNL HYDRO-HYDRO 2385 851 37800
KALISINDH TPP 1 RRVUNL THERMAL-COAL 60000 341543 45000
KALISINDH TPP 2 RRVUNL THERMAL-COAL 60000 211588 45000
KHARA HEP UPJVNL HYDRO-HYDRO 7200 26654 7200
MATATILLA HEP UPJVNL HYDRO-HYDRO 3060 12219 6500
OBRA HEP UPJVNL HYDRO-HYDRO 9900 21517 6300
RIHAND UPJVNL HYDRO-HYDRO 30000 57369 5500
ANPARA A TPS UPRVUNL THERMAL-COAL 63000 317536 27000
ANPARA B TPS UPRVUNL THERMAL-COAL 100000 705605 22700
ANPARA D UPRVUNL THERMAL-COAL 100000 300158 39800
HARDUAGANJ TPS UPRVUNL THERMAL-COAL 16500 45817 49200
HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 50000 304389 46600
OBRA A TPS UPRVUNL THERMAL-COAL 28800 13158 34000
OBRA B TPS UPRVUNL THERMAL-COAL 100000 328124 21900
Page 34
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) PANKI TPS UPRVUNL THERMAL-COAL 21000 66488 50300
PARICHHA TPS UPRVUNL THERMAL-COAL 22000 38762 49400
PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 42000 231931 45600
PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 50000 276722 50400
CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 24000 70845 8290
CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 14400 75366 8390
DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 3375 9595 12080
DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 5100 18701 10520
KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4140 17359 12330
KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 12000 33001 9420
KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 3000 11953 8320
TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 9000 33983 12460
MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 30400 124510 16110
RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 19800 17897 10550
MPUR UTTARAKHAND JVNL HYDRO-HYDRO 930 5121 19200
PATHRI UTTARAKHAND JVNL HYDRO-HYDRO 2040 11636 14200
GALOGI UTTARAKHAND JVNL HYDRO-HYDRO 300 648 12500
PRIVATE SECTOR
MGTPP CLP INDIA PVT LTD THERMAL-COAL 132000 268902 41940
SHRINAGAR HEP ALAKNANDA HPCL HYDRO-HYDRO 33000 127414 48800
GAMA INFRAPROP CCPP GAMA INFRAPROP PVT THERMAL-GAS 22500 52686 47000
PPGCL (BARA) JP POWER VENTURES LTD THERMAL-COAL 198000 448200 38500
MALANA HEP MALANA PCL HYDRO-HYDRO 8600 26354 29792
MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 10000 30369 32580
ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 19200 56347 36079
KASHANG HEP H P PCL HYDRO-HYDRO 19500 5034 29200
BASPA-II HEP HBPCL HYDRO-HYDRO 30000 132769 13600
KARCHAM WANGTOO HEP HBPCL HYDRO-HYDRO 100000 434386 36600
RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 108000 582600 43700
RITHALA COMBI CY POWER PLANT TATA POWER DDL THERMAL-GAS 9480 000 11900
RAJPURA TPS NABHA POWER LTD THERMAL-GAS 140000 901484 39000
TALWANDI SABO POWER LTD TALWANDI SABO POWER LTD THERMAL-COAL 198000 636040 49548
ROJA THERMAL POWER STATION ROJA POWER SCL THERMAL-COAL 120000 727200 43400
KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 34400 63400
BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 36000 62600
MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 38200 60800
UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 37900 61500
KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 42300 58800
LALITPUR PGCL BAJAJ ENERGY PVT LTD THERMAL-COAL 198000 359400 47300
PRAYAGRAJ PGCL PRAYAGRAJ PGCL THERMAL-COAL 132000 448200 38595
KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 132000 783182 33438
WESTERN REGION
CENTRAL SECTOR
INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 100000 325333 23892
OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 52000 141663 34001
GANDHAR CCPP NTPC LTD THERMAL-GAS 65739 221924 28700
KAWAS CCPP NTPC LTD THERMAL-GASN 65620 167929 27000
KORBA I amp II NTPC LTD THERMAL-COAL 210000 1499171 20500
KORBA III NTPC LTD THERMAL-COAL 50000 358746 26600
SIPAT STPS I NTPC LTD THERMAL-COAL 198000 1479902 26800
SIPAT STPS II NTPC LTD THERMAL-COAL 100000 766549 26500
VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 126000 693142 25800
VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 100000 608781 23800
VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 100000 673475 27600
VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 100000 655924 32900
VINDHYACHAL STPS V NTPC LTD THERMAL-COAL 50000 328265 31700
MOUDA I NTPC LTD THERMAL-COAL 100000 343130 44500
MOUDA Ii NTPC LTD THERMAL-COAL 66000 40637 39900
RATNAGIRI GAS amp POWER PVT LTD RGPPL THERMAL-GAS 196708 442485 47000
KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 000 24729
TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 32000 201227 10740
Page 35
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 365122 19069
TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 787444 29324
STATE SECTOR
GSEG-HAZIRA15610 MW GUJARAT S ENEGEN LTD THERMAL-GAS 15610 1805 28200
GSEG-HAZIRA35143 MW GUJARAT S ENEGEN LTD THERMAL-GAS 35130 22276 51300
GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 21978 51800
AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 13929 26100
KORBA TPS EAST CSPGCL THERMAL-COAL 44000 198673 33880
DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 365808 27570
KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 316500 30420
HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 532878 19410
CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 515 58300
MTTPS CHAMPA U-I CSPGCL THERMAL-COAL 50000 220376 39000
MTTPS CHAMPA U-II CSPGCL THERMAL-COAL 50000 23709 10000
SHP GANGREL CSPGCL HYDRO-HYDRO 1000 2350 36790
BANGO HEP CSPGCL HYDRO-HYDRO 12000 14662 8900
MHP KORBA WEST CSPGCL HYDRO-HYDRO 170 859 38190
SIKASAR HEP CSPGCL HYDRO-HYDRO 700 418 26870
DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8843 74500
DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 19446 51500
GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 66388 71600
GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127488 41300
KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 96072 43900
KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 29841 56400
SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 184966 58800
UKAI 1-5 GSECL THERMAL-COAL 85000 204891 46900
UKAI TPS 6 GSECL THERMAL-COAL 50000 284448 48200
WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 271999 58300
WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 82808 44100
KADANA HPS GSECL HYDRO-HYDRO 24200 34433 16800
UKAI HPS GSECL HYDRO-HYDRO 30500 40585 6100
TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 123000 11500
BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 8900 10900
BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 7200 27500
JHINNA HPS MPPGCL HYDRO-HYDRO 2000 9700 18500
RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 44300 3400
GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 17300 4600
SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 4100 16900
MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 14600 27000
PENCH HPS MPPGCL HYDRO-HYDRO 16000 23700 8100
RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 3000 16900
AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 134400 35100
SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 283800 38700
SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 344600 34300
SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 111600 61600
SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 211800 58000
SSTPS PH-I MPPGCL THERMAL-COAL 120000 233100 84300
BHUSAWAL TPS MSPGCL THERMAL-COAL 142000 566258 51100
CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1365682 33700
KHAPERKHEDA MSPGCL THERMAL-COAL 134000 706207 39100
KORADI TPS MSPGCL THERMAL-COAL 62000 443206 42000
NASIK TPS MSPGCL THERMAL-COAL 63000 297275 47000
PARLI TPS MSPGCL THERMAL-COAL 113000 175934 71600
PARAS MSPGCL THERMAL-COAL 50000 267931 38700
URAN CCPP MSPGCL THERMAL-GAS 67200 320330 30600
KOYANA MSPGCL HYDRO-HYDRO 195600 328155 13100
SMALL HYDRO POWER PLANTS MSPGCL HYDRO-HYDRO 45400 93062 30500
BHIRA MSPGCL HYDRO-HYDRO 8000 10046 8400
TILLARI MSPGCL HYDRO-HYDRO 8900 10584 3100
SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 233298 20500
SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 87633 20500
PRIVATE SECTOR
Page 36
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 81282 46750
JNSTPP(JAYPEE NIGRIE) JP POWER VENTURES LTD THERMAL-COAL 132000 726695 29310
MB POWER MB POWER THERMAL-COAL 120000 345632 38310
ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 754922 28671
ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 780761 23495
ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 198000 1263784 32090
ADANI POWER MAHARA ADANI POWER LTD THERMAL-COAL 330000 1666191 34124
AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 170065 36827
SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 252035 45129
ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 458551 36000
ESSAR POWER MP LTD ESSAR POWER MP LTD THERMAL-COAL 60000 243040 28600
VEDANTA LTD (P P -I) VEDANTA LTD THERMAL-GAS 3000 15044 24000
VEDANTA LTD (P P -II) VEDANTA LTD THERMAL-GAS 3000 21293 24000
PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 8234600 24000
165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 5850 64390
145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 68717 40349
SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 132655 28776
SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 144686 38567
MUNDRA UMPPCOASTAL GUJARAT POWER
LTD THERMAL-IMP COAL 400000 2530300
23900
LANCO AMARKANTAK TPP PATHADIH
U-ILANCO AMARKAN POWER LTD THERMAL-COAL 30000 195500
29200
LANCO AMARKANTAK TPP PATHADIH
U-IILANCO AMARKAN POWER LTD THERMAL-COAL 30000 206900
27600
BARADARHA TPS D B POWER LTD THERMAL-COAL 120000 677373 29200
JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 405000 28900
JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 453000 40500
DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 339437 40700
TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 293400 44000
TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 137200 37000
TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 174900 44000
BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 92900 14100
BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23700 34300
KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 27600 48300
CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2530300 23900
BHANDARDRA HEP -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 2475 54900
SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 161400 26500
SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 445000 39000
SOTHERN REGION
CENTRAL SECTOR
NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 325699 54820
NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 305532 39880
NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 998805 38510
NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 113016 54070
NEYVELI TAMILNADU POWER LTD JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 625274 42200
VALLUR TPS NTPC TECL THERMAL-COAL 150000 856438 42350
R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 1493 84300
RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1502919 29400
RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 341291 31800
SIMHADRI I NTPC LTD THERMAL-COAL 100000 688382 36800
SIMHADRI II NTPC LTD THERMAL-COAL 100000 663657 43400
KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 593110 31324
MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 291625 21764
KKNPP-1 amp 2 NPCIL NUCLEAR-NUCLEAR 200000 572609 40948
MINICOY LAKSHADEEP THERMAL-DIESEL 340 770 29600
KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1097 29600
AMINI LAKSHADEEP THERMAL-DIESEL 265 509 29600
ANDROTT LAKSHADEEP THERMAL-DIESEL 219 524 29600
KALPENI LAKSHADEEP THERMAL-DIESEL 175 356 29600
AGATTI LAKSHADEEP THERMAL-DIESEL 195 658 29600
KADMAT LAKSHADEEP THERMAL-DIESEL 190 414 29600
KILTAN LAKSHADEEP THERMAL-DIESEL 150 269 29600
CHETLET LAKSHADEEP THERMAL-DIESEL 100 139 29600
BITRA LAKSHADEEP THERMAL-DIESEL 043 024 29600
BANGARAM LAKSHADEEP THERMAL-DIESEL 018 009 29600
Page 37
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) STATE SECTOR
Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 721811 46500
Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 50000 336142 46500
RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 237358 46500
RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 239926 46500
RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 124500 46500
SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 62109 46500
UPPER SILERU APGENCO HYDRO-HYDRO 24000 33000 46500
LOWER SILERU APGENCO HYDRO-HYDRO 46000 81066 46500
DONKARAI APGENCO HYDRO-HYDRO 2500 6007 46500
PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 1262 46500
CHETTIPETA APGENCO HYDRO-HYDRO 100 214 46500
MUCHKUND APGENCO HYDRO-HYDRO 12000 37571 46500
NAGARJUNASAGAR RCPH APGENCO HYDRO-HYDRO 9000 606 46500
TUNGABHADRA HES amp HAMPI(AP
Share)
APGENCO HYDRO-HYDRO 7200 6100 46500
KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 352232 42600
KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 288131 32500
KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 319272 46500
RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 40073 44300
KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 308317 46000
KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 308963 51300
SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 61004 76600
NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 17960 75300
PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 20873 58300
POCHAMPAD-I TSPGENCO HYDRO-HYDRO 2700 5455 29800
POCHAMPAD-II TSPGENCO HYDRO-HYDRO 900 1932 40700
NIZAMSAGAR TSPGENCO HYDRO-HYDRO 1000 1126 53400
RAICHUR TPS 1 to 7 KPCL THERMAL-COAL 147000 890866 43800
RAICHUR TPS 8 KPCL THERMAL-COAL 25000 159523 48200
BELLARI TPS 1 KPCL THERMAL-COAL 50000 318679 51100
BELLARI TPS 2 KPCL THERMAL-COAL 50000 232347 55600
BELLARI TPS 3 KPCL THERMAL-COAL 70000 47565 34400
BHADRA PH KPCL HYDRO-HYDRO 3920 2369 45900
GERUSUPPA PH KPCL HYDRO-HYDRO 24000 26990 22000
GHAT PRABHA HEP KPCL HYDRO-HYDRO 3200 4777 25300
KADRA HPS KPCL HYDRO-HYDRO 15000 16889 26800
NAGJHARI KPCL HYDRO-HYDRO 90000 155159 9800
KODASALLI DPH KPCL HYDRO-HYDRO 12000 14854 19200
MUNIRA+MGH+SPH+SPH KPCL HYDRO-HYDRO 22640 48211 7900
SHARAVATHY HPS KPCL HYDRO-HYDRO 108550 276215 5400
ALMATTI DPH KPCL HYDRO-HYDRO 29000 39611 24600
VARAHI UGPH KPCL HYDRO-HYDRO 46000 71368 15600
IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 17196 15300
IDUKKI HPS KSEB HYDRO-HYDRO 78000 137905 15300
KAKKAD HPS KSEB HYDRO-HYDRO 5000 13063 15300
KALLADA HPS KSEB HYDRO-HYDRO 1500 4436 15300
KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 46544 15300
KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 635 15300
LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 30822 15300
MALANKARA HPS KSEB HYDRO-HYDRO 1050 2474 15300
MATTUPETTY KSEB HYDRO-HYDRO 200 230 15300
MALAMPUZHA KSEB HYDRO-HYDRO 250 063 15300
CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 864 15300
URUMI ST I amp II KSEB HYDRO-HYDRO 615 903 15300
LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 248 15300
NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7765 19625 15300
PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 16601 15300
PANNIAR HPS KSEB HYDRO-HYDRO 3240 6217 15300
PORINGALKUTHU KSEB HYDRO-HYDRO 3600 10052 15300
PORINGALKUTHU LBE KSEB HYDRO-HYDRO 1600 9438 15300
PEPPARA KSEB HYDRO-HYDRO 300 395 15300
POOZHITHODE KSEB HYDRO-HYDRO 480 1045 15300
Page 38
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) PEECHI KSEB HYDRO-HYDRO 125 040 15300
RANI-PERUNADU KSEB HYDRO-HYDRO 400 585 15300
SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 79783 15300
SENGULAM HPS KSEB HYDRO-HYDRO 5120 11558 15300
SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 16711 15300
VILANGAD KSEB HYDRO-HYDRO 750 1578 15300
BARAPOLE KSEB HYDRO-HYDRO 1500 1932 15300
VELLATHOOVAL KSEB HYDRO-HYDRO 360 305 15300
CHIM0NY KSEB HYDRO-HYDRO 250 156 15300
ADYANPARA KSEB HYDRO-HYDRO 350 501 15300
BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 554 15300
KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 3801 15300
KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 23132 32800
ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 14416 62280
METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 523970 62280
METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 321270 62280
NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 336575 62280
NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 591240 62280
TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 508966 62280
KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 30897 62280
VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 18720 90699 62280
KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 33593 62280
BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 1047 62280
PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 1250 62280
PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 330 62280
MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 4897 62280
MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 032 62280
KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15681 62280
KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 40608 62280
KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 21342 62280
KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 4717 62280
KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4322 62280
KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2399 62280
METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 4416 62280
METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 8035 62280
BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2187 62280
BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2359 62280
BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2511 62280
BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 1949 62280
BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 1819 62280
POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 172 62280
SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 241 62280
MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 026 62280
THIRUMOORTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 136 62280
PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 9309 62280
VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 353 62280
SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 4192 62280
PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 6571 62280
SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 1186 62280
SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6319 62280
ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 6122 62280
KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 28674 62280
SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 18381 62280
SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 4258 62280
KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 12680 62280
KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4201 62280
ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 000 62280
PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 19175 62280
AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 078 62280
BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 504 62280
BHAVANI KATTALAI (BKB)(IIIampIII BB I amp II)TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 5847 62280
PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 000 62280
Page 39
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) SRI DAMODARAM STPS APPDCL THERMAL-COAL 160000 808108 36300
PRIVATE SECTOR
KARUPPUR TANJORE LANCO TANJORE PCL THERMAL-GAS 12000 48096 28770
SIMHAPURI ENERGY LTD SIMHAPURI ENERGY LTD THERMAL-COAL 60000 143900 39100
JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 7111 45500
SBU 1 JSW ENERGY LTD
VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 26000 159100
43300
SBU 2 JSW ENERGY LTD
VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 60000 247900
42800
LANCO KPLLANCO KONDAPALLI POWER
LTDTHERMAL-GAS 36814 85060
25776
LANCO KPL STG -IILANCO KONDAPALLI POWER
LTDTHERMAL-GAS 36600 12979
46330
LANCO KPL STG -IIIALANCO KONDAPALLI POWER
LTDTHERMAL-GAS 37100 85710
46330
LANCO KPL STG -III BLANCO KONDAPALLI POWER
LTDTHERMAL-GAS 37100 43639
46330
HINDUJA NATIONAL PCL HINDUJA NATIONAL PCL THERMAL-COAL 104000 303000 38200
MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 121164 49940
UDUPI POWER COR LTD ADANI POWER LTD THERMAL-COAL 120000 754613 42500
SPECTRUM POWER GENERATION
LTD SPECTRUM PG LTD THERMAL-GASN 20525 9256812
34952
TAQA NEYVELI POWER COM PVT
LTD TAQA NEYVELI THERMAL-LIG 25000 5840
34500
ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 251000 51000
ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 207860 36800
GMR VEMAGIRI POWER GENERATION
LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 30117
46450
EASTERN REGION
CENTRAL SECTOR
MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 64675 53113
MTPS STAGE - II KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 39000 1432 69138
BOKARO `B` TPS DVC THERMAL-COAL 63000 145670 31539
MEJIA TPS U 1-3 DVC THERMAL-COAL 63000 348298 31552
MEJIA TPS U 4 DVC THERMAL-COAL 21000 116099 34997
MEJIA TPS U 5-6 DVC THERMAL-COAL 50000 276427 35976
MEJIA TPS U 7-8 DVC THERMAL-COAL 100000 552854 36991
DURGAPUR STEEL TPS DVC THERMAL-COAL 100000 665550 39323
DURGAPUR TPS DVC THERMAL-COAL 21000 59270 35416
RAGHUNATHPUR TPS DVC THERMAL-COAL 120000 201650 35326
MAITHON HYDEL STA DVC HYDRO-HYDRO 6320 12200 17984
CHANDRAPURA TPSU1-3 DVC THERMAL-COAL 42000 257610 35095
CHANDRAPURA TPSU7-8 DVC THERMAL-COAL 50000 306673 34987
KODERMA TPS DVC THERMAL-COAL 100000 380180 38131
PANCHET HPS DVC HYDRO-HYDRO 8000 13360 17984
TILLAYA HPS DVC HYDRO-HYDRO 400 1410 17984
RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34700 35400
TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 277300 23200
TLDP -III NHPC LTD HYDRO-HYDRO 13200 55400 62000
TLDP -IV NHPC LTD HYDRO-HYDRO 16000 60300 25600
FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 957219 33700
FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 308943 41000
BONGAINGAON TPS NTPC LTD THERMAL-COAL 25000 153663 58600
KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 542277 34200
KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 942591 34200
BARH-II NTPC LTD THERMAL-COAL 132000 728021 44500
TALCHER TPS NTPC LTD THERMAL-COAL 46000 335521 30100
TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 702319 25600
TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1436521 24700
STATE SECTOR
BTPS(RampM) BIHAR STATE PGCL THERMAL-COAL 22000 12142 39700
BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 98331 10602
HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 50593 9482
CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 19689 2605
RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 53192 6033
UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 147208 14637
Page 40
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 60353 4519
IB TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 288567 25000
J P H GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 210 038 61100
MEYONG CHU GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 400 1086 61100
TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 122667 38200
DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 214339 43321
KOLAGHAT THERMAL POWER
STATION
WEST BENGAL PDCL THERMAL-COAL 126000 538269 31603
BAKRESHWAR THERMAL POWER
PLANT
WEST BENGAL PDCL THERMAL-COAL 105000 634876 32154
BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 45000 166855 33299
SANTHALDIH THERMAL POWER
STATION
WEST BENGAL PDCL THERMAL-COAL 50000 336442 34932
SAGARDIGHI THERMAL POWER
PROJECT
WEST BENGAL PDCL THERMAL-COAL 160000 423121 34705
JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 20344 68900
RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 24559 68900
TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 4623 68900
PURULIA PUMPED STORAGE
PROJECT
WEST BENGAL SEDCL HYDRO-HYDRO 90000 108816 68900
MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2768 68900
PRIVATE SECTOR
CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 49474 20230
CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 555500 70200
HALDIA ENERGY HALDIA ENERGY LTD THERMAL-COAL 60000 371000 50400
DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3688 63400
KAMALANGA TPS GMR KAMALANGA ENERGY LTD THERMAL-COAL 105000547670
33300
ADHUNIK POWER U-1 ADHUNIK POWER THERMAL-COAL 27000 158 44060
ADHUNIK POWER U-2 ADHUNIK POWER THERMAL-COAL 27000 168 44250
VL-JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 332800 23622
JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 43000 45250
JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 71700 37030
JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 70700 35920
JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 71100 38870
JOJOBERA UNIT 5 TATA POWER COM LTD THERMAL-COAL 12000 79300 44560
JOJOBERA UNIT 6 TATA POWER COM LTD THERMAL-WHR 12000 83700 12840
IEL KALINGANAGAR U-I TATA POWER COM LTD THERMAL-WG 6750 33400 22500
IEL KALINGANAGAR U-II TATA POWER COM LTD THERMAL-WG 6750 34800 22500
MAITHON UNIT 1 amp 2 TATA POWER COM LTD THERMAL-COAL 105000 678000 36100
HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 27500 24340
HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 28400 24340
HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 15800 24310
NORTH EASTERN REGION
CENTRAL SECTOR
LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 74100 36600
AGARTALA GT NEEPCO THERMAL-GAS 13500 88611 27210
ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 153111 32310
DOYANG HEP NEEPCO HYDRO-HYDRO 7500 25598 49801
KOPILI HEP NEEPCO HYDRO-HYDRO 20000 98186 11491
KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 19582 20237
KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 10310 17968
RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 124093 22945
TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 10100 17344 39000
STATE SECTOR
HYDRO POWER (122 Stns) ITANAGAR GOVT OF ARUNACHAL
PRADESHHYDRO-HYDRO 6971 6217270
24600
KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39514 17337
LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 82327 36810
NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 33318 48290
MYNTRIANG SHEP ST II ASSAM POWER GENCO HYDRO-HYDRO 300 567 35776
LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 9130 49200
LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 012 49200
DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 022 49200
TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 000 49200
UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 4990 16000
UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 6476 37000
UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 16494 14600
UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 3600 9556 15000
SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 758 8000
MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44070 44800
KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 154 41400
TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 091 41400
MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 411 41400
MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 394 41400
KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 760 41400
SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 3264 41400
LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 044 41400
BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 18953 28000
ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 43585 28200
GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 4080 11100
Note
LIG Lignite N Naptha WHR Waste Heat Recovery
Page 41
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) PANKI TPS UPRVUNL THERMAL-COAL 21000 66488 50300
PARICHHA TPS UPRVUNL THERMAL-COAL 22000 38762 49400
PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 42000 231931 45600
PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 50000 276722 50400
CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 24000 70845 8290
CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 14400 75366 8390
DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 3375 9595 12080
DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 5100 18701 10520
KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4140 17359 12330
KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 12000 33001 9420
KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 3000 11953 8320
TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 9000 33983 12460
MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 30400 124510 16110
RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 19800 17897 10550
MPUR UTTARAKHAND JVNL HYDRO-HYDRO 930 5121 19200
PATHRI UTTARAKHAND JVNL HYDRO-HYDRO 2040 11636 14200
GALOGI UTTARAKHAND JVNL HYDRO-HYDRO 300 648 12500
PRIVATE SECTOR
MGTPP CLP INDIA PVT LTD THERMAL-COAL 132000 268902 41940
SHRINAGAR HEP ALAKNANDA HPCL HYDRO-HYDRO 33000 127414 48800
GAMA INFRAPROP CCPP GAMA INFRAPROP PVT THERMAL-GAS 22500 52686 47000
PPGCL (BARA) JP POWER VENTURES LTD THERMAL-COAL 198000 448200 38500
MALANA HEP MALANA PCL HYDRO-HYDRO 8600 26354 29792
MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 10000 30369 32580
ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 19200 56347 36079
KASHANG HEP H P PCL HYDRO-HYDRO 19500 5034 29200
BASPA-II HEP HBPCL HYDRO-HYDRO 30000 132769 13600
KARCHAM WANGTOO HEP HBPCL HYDRO-HYDRO 100000 434386 36600
RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 108000 582600 43700
RITHALA COMBI CY POWER PLANT TATA POWER DDL THERMAL-GAS 9480 000 11900
RAJPURA TPS NABHA POWER LTD THERMAL-GAS 140000 901484 39000
TALWANDI SABO POWER LTD TALWANDI SABO POWER LTD THERMAL-COAL 198000 636040 49548
ROJA THERMAL POWER STATION ROJA POWER SCL THERMAL-COAL 120000 727200 43400
KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 34400 63400
BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 36000 62600
MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 38200 60800
UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 37900 61500
KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 9000 42300 58800
LALITPUR PGCL BAJAJ ENERGY PVT LTD THERMAL-COAL 198000 359400 47300
PRAYAGRAJ PGCL PRAYAGRAJ PGCL THERMAL-COAL 132000 448200 38595
KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 132000 783182 33438
WESTERN REGION
CENTRAL SECTOR
INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 100000 325333 23892
OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 52000 141663 34001
GANDHAR CCPP NTPC LTD THERMAL-GAS 65739 221924 28700
KAWAS CCPP NTPC LTD THERMAL-GASN 65620 167929 27000
KORBA I amp II NTPC LTD THERMAL-COAL 210000 1499171 20500
KORBA III NTPC LTD THERMAL-COAL 50000 358746 26600
SIPAT STPS I NTPC LTD THERMAL-COAL 198000 1479902 26800
SIPAT STPS II NTPC LTD THERMAL-COAL 100000 766549 26500
VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 126000 693142 25800
VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 100000 608781 23800
VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 100000 673475 27600
VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 100000 655924 32900
VINDHYACHAL STPS V NTPC LTD THERMAL-COAL 50000 328265 31700
MOUDA I NTPC LTD THERMAL-COAL 100000 343130 44500
MOUDA Ii NTPC LTD THERMAL-COAL 66000 40637 39900
RATNAGIRI GAS amp POWER PVT LTD RGPPL THERMAL-GAS 196708 442485 47000
KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 000 24729
TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 32000 201227 10740
Page 35
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 365122 19069
TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 787444 29324
STATE SECTOR
GSEG-HAZIRA15610 MW GUJARAT S ENEGEN LTD THERMAL-GAS 15610 1805 28200
GSEG-HAZIRA35143 MW GUJARAT S ENEGEN LTD THERMAL-GAS 35130 22276 51300
GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 21978 51800
AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 13929 26100
KORBA TPS EAST CSPGCL THERMAL-COAL 44000 198673 33880
DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 365808 27570
KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 316500 30420
HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 532878 19410
CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 515 58300
MTTPS CHAMPA U-I CSPGCL THERMAL-COAL 50000 220376 39000
MTTPS CHAMPA U-II CSPGCL THERMAL-COAL 50000 23709 10000
SHP GANGREL CSPGCL HYDRO-HYDRO 1000 2350 36790
BANGO HEP CSPGCL HYDRO-HYDRO 12000 14662 8900
MHP KORBA WEST CSPGCL HYDRO-HYDRO 170 859 38190
SIKASAR HEP CSPGCL HYDRO-HYDRO 700 418 26870
DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8843 74500
DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 19446 51500
GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 66388 71600
GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127488 41300
KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 96072 43900
KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 29841 56400
SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 184966 58800
UKAI 1-5 GSECL THERMAL-COAL 85000 204891 46900
UKAI TPS 6 GSECL THERMAL-COAL 50000 284448 48200
WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 271999 58300
WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 82808 44100
KADANA HPS GSECL HYDRO-HYDRO 24200 34433 16800
UKAI HPS GSECL HYDRO-HYDRO 30500 40585 6100
TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 123000 11500
BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 8900 10900
BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 7200 27500
JHINNA HPS MPPGCL HYDRO-HYDRO 2000 9700 18500
RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 44300 3400
GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 17300 4600
SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 4100 16900
MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 14600 27000
PENCH HPS MPPGCL HYDRO-HYDRO 16000 23700 8100
RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 3000 16900
AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 134400 35100
SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 283800 38700
SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 344600 34300
SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 111600 61600
SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 211800 58000
SSTPS PH-I MPPGCL THERMAL-COAL 120000 233100 84300
BHUSAWAL TPS MSPGCL THERMAL-COAL 142000 566258 51100
CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1365682 33700
KHAPERKHEDA MSPGCL THERMAL-COAL 134000 706207 39100
KORADI TPS MSPGCL THERMAL-COAL 62000 443206 42000
NASIK TPS MSPGCL THERMAL-COAL 63000 297275 47000
PARLI TPS MSPGCL THERMAL-COAL 113000 175934 71600
PARAS MSPGCL THERMAL-COAL 50000 267931 38700
URAN CCPP MSPGCL THERMAL-GAS 67200 320330 30600
KOYANA MSPGCL HYDRO-HYDRO 195600 328155 13100
SMALL HYDRO POWER PLANTS MSPGCL HYDRO-HYDRO 45400 93062 30500
BHIRA MSPGCL HYDRO-HYDRO 8000 10046 8400
TILLARI MSPGCL HYDRO-HYDRO 8900 10584 3100
SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 233298 20500
SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 87633 20500
PRIVATE SECTOR
Page 36
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 81282 46750
JNSTPP(JAYPEE NIGRIE) JP POWER VENTURES LTD THERMAL-COAL 132000 726695 29310
MB POWER MB POWER THERMAL-COAL 120000 345632 38310
ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 754922 28671
ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 780761 23495
ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 198000 1263784 32090
ADANI POWER MAHARA ADANI POWER LTD THERMAL-COAL 330000 1666191 34124
AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 170065 36827
SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 252035 45129
ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 458551 36000
ESSAR POWER MP LTD ESSAR POWER MP LTD THERMAL-COAL 60000 243040 28600
VEDANTA LTD (P P -I) VEDANTA LTD THERMAL-GAS 3000 15044 24000
VEDANTA LTD (P P -II) VEDANTA LTD THERMAL-GAS 3000 21293 24000
PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 8234600 24000
165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 5850 64390
145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 68717 40349
SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 132655 28776
SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 144686 38567
MUNDRA UMPPCOASTAL GUJARAT POWER
LTD THERMAL-IMP COAL 400000 2530300
23900
LANCO AMARKANTAK TPP PATHADIH
U-ILANCO AMARKAN POWER LTD THERMAL-COAL 30000 195500
29200
LANCO AMARKANTAK TPP PATHADIH
U-IILANCO AMARKAN POWER LTD THERMAL-COAL 30000 206900
27600
BARADARHA TPS D B POWER LTD THERMAL-COAL 120000 677373 29200
JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 405000 28900
JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 453000 40500
DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 339437 40700
TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 293400 44000
TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 137200 37000
TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 174900 44000
BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 92900 14100
BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23700 34300
KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 27600 48300
CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2530300 23900
BHANDARDRA HEP -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 2475 54900
SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 161400 26500
SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 445000 39000
SOTHERN REGION
CENTRAL SECTOR
NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 325699 54820
NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 305532 39880
NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 998805 38510
NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 113016 54070
NEYVELI TAMILNADU POWER LTD JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 625274 42200
VALLUR TPS NTPC TECL THERMAL-COAL 150000 856438 42350
R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 1493 84300
RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1502919 29400
RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 341291 31800
SIMHADRI I NTPC LTD THERMAL-COAL 100000 688382 36800
SIMHADRI II NTPC LTD THERMAL-COAL 100000 663657 43400
KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 593110 31324
MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 291625 21764
KKNPP-1 amp 2 NPCIL NUCLEAR-NUCLEAR 200000 572609 40948
MINICOY LAKSHADEEP THERMAL-DIESEL 340 770 29600
KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1097 29600
AMINI LAKSHADEEP THERMAL-DIESEL 265 509 29600
ANDROTT LAKSHADEEP THERMAL-DIESEL 219 524 29600
KALPENI LAKSHADEEP THERMAL-DIESEL 175 356 29600
AGATTI LAKSHADEEP THERMAL-DIESEL 195 658 29600
KADMAT LAKSHADEEP THERMAL-DIESEL 190 414 29600
KILTAN LAKSHADEEP THERMAL-DIESEL 150 269 29600
CHETLET LAKSHADEEP THERMAL-DIESEL 100 139 29600
BITRA LAKSHADEEP THERMAL-DIESEL 043 024 29600
BANGARAM LAKSHADEEP THERMAL-DIESEL 018 009 29600
Page 37
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) STATE SECTOR
Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 721811 46500
Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 50000 336142 46500
RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 237358 46500
RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 239926 46500
RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 124500 46500
SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 62109 46500
UPPER SILERU APGENCO HYDRO-HYDRO 24000 33000 46500
LOWER SILERU APGENCO HYDRO-HYDRO 46000 81066 46500
DONKARAI APGENCO HYDRO-HYDRO 2500 6007 46500
PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 1262 46500
CHETTIPETA APGENCO HYDRO-HYDRO 100 214 46500
MUCHKUND APGENCO HYDRO-HYDRO 12000 37571 46500
NAGARJUNASAGAR RCPH APGENCO HYDRO-HYDRO 9000 606 46500
TUNGABHADRA HES amp HAMPI(AP
Share)
APGENCO HYDRO-HYDRO 7200 6100 46500
KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 352232 42600
KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 288131 32500
KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 319272 46500
RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 40073 44300
KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 308317 46000
KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 308963 51300
SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 61004 76600
NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 17960 75300
PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 20873 58300
POCHAMPAD-I TSPGENCO HYDRO-HYDRO 2700 5455 29800
POCHAMPAD-II TSPGENCO HYDRO-HYDRO 900 1932 40700
NIZAMSAGAR TSPGENCO HYDRO-HYDRO 1000 1126 53400
RAICHUR TPS 1 to 7 KPCL THERMAL-COAL 147000 890866 43800
RAICHUR TPS 8 KPCL THERMAL-COAL 25000 159523 48200
BELLARI TPS 1 KPCL THERMAL-COAL 50000 318679 51100
BELLARI TPS 2 KPCL THERMAL-COAL 50000 232347 55600
BELLARI TPS 3 KPCL THERMAL-COAL 70000 47565 34400
BHADRA PH KPCL HYDRO-HYDRO 3920 2369 45900
GERUSUPPA PH KPCL HYDRO-HYDRO 24000 26990 22000
GHAT PRABHA HEP KPCL HYDRO-HYDRO 3200 4777 25300
KADRA HPS KPCL HYDRO-HYDRO 15000 16889 26800
NAGJHARI KPCL HYDRO-HYDRO 90000 155159 9800
KODASALLI DPH KPCL HYDRO-HYDRO 12000 14854 19200
MUNIRA+MGH+SPH+SPH KPCL HYDRO-HYDRO 22640 48211 7900
SHARAVATHY HPS KPCL HYDRO-HYDRO 108550 276215 5400
ALMATTI DPH KPCL HYDRO-HYDRO 29000 39611 24600
VARAHI UGPH KPCL HYDRO-HYDRO 46000 71368 15600
IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 17196 15300
IDUKKI HPS KSEB HYDRO-HYDRO 78000 137905 15300
KAKKAD HPS KSEB HYDRO-HYDRO 5000 13063 15300
KALLADA HPS KSEB HYDRO-HYDRO 1500 4436 15300
KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 46544 15300
KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 635 15300
LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 30822 15300
MALANKARA HPS KSEB HYDRO-HYDRO 1050 2474 15300
MATTUPETTY KSEB HYDRO-HYDRO 200 230 15300
MALAMPUZHA KSEB HYDRO-HYDRO 250 063 15300
CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 864 15300
URUMI ST I amp II KSEB HYDRO-HYDRO 615 903 15300
LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 248 15300
NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7765 19625 15300
PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 16601 15300
PANNIAR HPS KSEB HYDRO-HYDRO 3240 6217 15300
PORINGALKUTHU KSEB HYDRO-HYDRO 3600 10052 15300
PORINGALKUTHU LBE KSEB HYDRO-HYDRO 1600 9438 15300
PEPPARA KSEB HYDRO-HYDRO 300 395 15300
POOZHITHODE KSEB HYDRO-HYDRO 480 1045 15300
Page 38
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) PEECHI KSEB HYDRO-HYDRO 125 040 15300
RANI-PERUNADU KSEB HYDRO-HYDRO 400 585 15300
SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 79783 15300
SENGULAM HPS KSEB HYDRO-HYDRO 5120 11558 15300
SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 16711 15300
VILANGAD KSEB HYDRO-HYDRO 750 1578 15300
BARAPOLE KSEB HYDRO-HYDRO 1500 1932 15300
VELLATHOOVAL KSEB HYDRO-HYDRO 360 305 15300
CHIM0NY KSEB HYDRO-HYDRO 250 156 15300
ADYANPARA KSEB HYDRO-HYDRO 350 501 15300
BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 554 15300
KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 3801 15300
KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 23132 32800
ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 14416 62280
METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 523970 62280
METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 321270 62280
NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 336575 62280
NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 591240 62280
TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 508966 62280
KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 30897 62280
VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 18720 90699 62280
KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 33593 62280
BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 1047 62280
PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 1250 62280
PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 330 62280
MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 4897 62280
MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 032 62280
KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15681 62280
KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 40608 62280
KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 21342 62280
KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 4717 62280
KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4322 62280
KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2399 62280
METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 4416 62280
METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 8035 62280
BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2187 62280
BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2359 62280
BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2511 62280
BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 1949 62280
BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 1819 62280
POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 172 62280
SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 241 62280
MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 026 62280
THIRUMOORTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 136 62280
PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 9309 62280
VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 353 62280
SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 4192 62280
PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 6571 62280
SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 1186 62280
SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6319 62280
ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 6122 62280
KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 28674 62280
SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 18381 62280
SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 4258 62280
KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 12680 62280
KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4201 62280
ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 000 62280
PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 19175 62280
AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 078 62280
BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 504 62280
BHAVANI KATTALAI (BKB)(IIIampIII BB I amp II)TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 5847 62280
PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 000 62280
Page 39
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) SRI DAMODARAM STPS APPDCL THERMAL-COAL 160000 808108 36300
PRIVATE SECTOR
KARUPPUR TANJORE LANCO TANJORE PCL THERMAL-GAS 12000 48096 28770
SIMHAPURI ENERGY LTD SIMHAPURI ENERGY LTD THERMAL-COAL 60000 143900 39100
JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 7111 45500
SBU 1 JSW ENERGY LTD
VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 26000 159100
43300
SBU 2 JSW ENERGY LTD
VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 60000 247900
42800
LANCO KPLLANCO KONDAPALLI POWER
LTDTHERMAL-GAS 36814 85060
25776
LANCO KPL STG -IILANCO KONDAPALLI POWER
LTDTHERMAL-GAS 36600 12979
46330
LANCO KPL STG -IIIALANCO KONDAPALLI POWER
LTDTHERMAL-GAS 37100 85710
46330
LANCO KPL STG -III BLANCO KONDAPALLI POWER
LTDTHERMAL-GAS 37100 43639
46330
HINDUJA NATIONAL PCL HINDUJA NATIONAL PCL THERMAL-COAL 104000 303000 38200
MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 121164 49940
UDUPI POWER COR LTD ADANI POWER LTD THERMAL-COAL 120000 754613 42500
SPECTRUM POWER GENERATION
LTD SPECTRUM PG LTD THERMAL-GASN 20525 9256812
34952
TAQA NEYVELI POWER COM PVT
LTD TAQA NEYVELI THERMAL-LIG 25000 5840
34500
ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 251000 51000
ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 207860 36800
GMR VEMAGIRI POWER GENERATION
LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 30117
46450
EASTERN REGION
CENTRAL SECTOR
MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 64675 53113
MTPS STAGE - II KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 39000 1432 69138
BOKARO `B` TPS DVC THERMAL-COAL 63000 145670 31539
MEJIA TPS U 1-3 DVC THERMAL-COAL 63000 348298 31552
MEJIA TPS U 4 DVC THERMAL-COAL 21000 116099 34997
MEJIA TPS U 5-6 DVC THERMAL-COAL 50000 276427 35976
MEJIA TPS U 7-8 DVC THERMAL-COAL 100000 552854 36991
DURGAPUR STEEL TPS DVC THERMAL-COAL 100000 665550 39323
DURGAPUR TPS DVC THERMAL-COAL 21000 59270 35416
RAGHUNATHPUR TPS DVC THERMAL-COAL 120000 201650 35326
MAITHON HYDEL STA DVC HYDRO-HYDRO 6320 12200 17984
CHANDRAPURA TPSU1-3 DVC THERMAL-COAL 42000 257610 35095
CHANDRAPURA TPSU7-8 DVC THERMAL-COAL 50000 306673 34987
KODERMA TPS DVC THERMAL-COAL 100000 380180 38131
PANCHET HPS DVC HYDRO-HYDRO 8000 13360 17984
TILLAYA HPS DVC HYDRO-HYDRO 400 1410 17984
RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34700 35400
TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 277300 23200
TLDP -III NHPC LTD HYDRO-HYDRO 13200 55400 62000
TLDP -IV NHPC LTD HYDRO-HYDRO 16000 60300 25600
FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 957219 33700
FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 308943 41000
BONGAINGAON TPS NTPC LTD THERMAL-COAL 25000 153663 58600
KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 542277 34200
KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 942591 34200
BARH-II NTPC LTD THERMAL-COAL 132000 728021 44500
TALCHER TPS NTPC LTD THERMAL-COAL 46000 335521 30100
TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 702319 25600
TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1436521 24700
STATE SECTOR
BTPS(RampM) BIHAR STATE PGCL THERMAL-COAL 22000 12142 39700
BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 98331 10602
HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 50593 9482
CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 19689 2605
RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 53192 6033
UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 147208 14637
Page 40
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 60353 4519
IB TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 288567 25000
J P H GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 210 038 61100
MEYONG CHU GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 400 1086 61100
TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 122667 38200
DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 214339 43321
KOLAGHAT THERMAL POWER
STATION
WEST BENGAL PDCL THERMAL-COAL 126000 538269 31603
BAKRESHWAR THERMAL POWER
PLANT
WEST BENGAL PDCL THERMAL-COAL 105000 634876 32154
BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 45000 166855 33299
SANTHALDIH THERMAL POWER
STATION
WEST BENGAL PDCL THERMAL-COAL 50000 336442 34932
SAGARDIGHI THERMAL POWER
PROJECT
WEST BENGAL PDCL THERMAL-COAL 160000 423121 34705
JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 20344 68900
RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 24559 68900
TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 4623 68900
PURULIA PUMPED STORAGE
PROJECT
WEST BENGAL SEDCL HYDRO-HYDRO 90000 108816 68900
MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2768 68900
PRIVATE SECTOR
CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 49474 20230
CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 555500 70200
HALDIA ENERGY HALDIA ENERGY LTD THERMAL-COAL 60000 371000 50400
DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3688 63400
KAMALANGA TPS GMR KAMALANGA ENERGY LTD THERMAL-COAL 105000547670
33300
ADHUNIK POWER U-1 ADHUNIK POWER THERMAL-COAL 27000 158 44060
ADHUNIK POWER U-2 ADHUNIK POWER THERMAL-COAL 27000 168 44250
VL-JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 332800 23622
JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 43000 45250
JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 71700 37030
JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 70700 35920
JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 71100 38870
JOJOBERA UNIT 5 TATA POWER COM LTD THERMAL-COAL 12000 79300 44560
JOJOBERA UNIT 6 TATA POWER COM LTD THERMAL-WHR 12000 83700 12840
IEL KALINGANAGAR U-I TATA POWER COM LTD THERMAL-WG 6750 33400 22500
IEL KALINGANAGAR U-II TATA POWER COM LTD THERMAL-WG 6750 34800 22500
MAITHON UNIT 1 amp 2 TATA POWER COM LTD THERMAL-COAL 105000 678000 36100
HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 27500 24340
HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 28400 24340
HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 15800 24310
NORTH EASTERN REGION
CENTRAL SECTOR
LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 74100 36600
AGARTALA GT NEEPCO THERMAL-GAS 13500 88611 27210
ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 153111 32310
DOYANG HEP NEEPCO HYDRO-HYDRO 7500 25598 49801
KOPILI HEP NEEPCO HYDRO-HYDRO 20000 98186 11491
KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 19582 20237
KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 10310 17968
RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 124093 22945
TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 10100 17344 39000
STATE SECTOR
HYDRO POWER (122 Stns) ITANAGAR GOVT OF ARUNACHAL
PRADESHHYDRO-HYDRO 6971 6217270
24600
KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39514 17337
LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 82327 36810
NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 33318 48290
MYNTRIANG SHEP ST II ASSAM POWER GENCO HYDRO-HYDRO 300 567 35776
LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 9130 49200
LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 012 49200
DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 022 49200
TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 000 49200
UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 4990 16000
UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 6476 37000
UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 16494 14600
UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 3600 9556 15000
SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 758 8000
MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44070 44800
KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 154 41400
TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 091 41400
MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 411 41400
MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 394 41400
KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 760 41400
SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 3264 41400
LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 044 41400
BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 18953 28000
ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 43585 28200
GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 4080 11100
Note
LIG Lignite N Naptha WHR Waste Heat Recovery
Page 41
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 50000 365122 19069
TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 108000 787444 29324
STATE SECTOR
GSEG-HAZIRA15610 MW GUJARAT S ENEGEN LTD THERMAL-GAS 15610 1805 28200
GSEG-HAZIRA35143 MW GUJARAT S ENEGEN LTD THERMAL-GAS 35130 22276 51300
GPPC CCPP GSPC PIPAVAV PCL THERMAL-GAS 70286 21978 51800
AKRIMOTA T P S GUJARAT MINERAL DCL THERMAL-LIG 25000 13929 26100
KORBA TPS EAST CSPGCL THERMAL-COAL 44000 198673 33880
DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 50000 365808 27570
KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 50000 316500 30420
HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 84000 532878 19410
CO-GEN KAWARDHA CSPGCL THERMAL-BIOMASS 600 515 58300
MTTPS CHAMPA U-I CSPGCL THERMAL-COAL 50000 220376 39000
MTTPS CHAMPA U-II CSPGCL THERMAL-COAL 50000 23709 10000
SHP GANGREL CSPGCL HYDRO-HYDRO 1000 2350 36790
BANGO HEP CSPGCL HYDRO-HYDRO 12000 14662 8900
MHP KORBA WEST CSPGCL HYDRO-HYDRO 170 859 38190
SIKASAR HEP CSPGCL HYDRO-HYDRO 700 418 26870
DHUVARAN CCPP-1 GSECL THERMAL-GAS 10662 8843 74500
DHUVARAN CCPP-2 GSECL THERMAL-GAS 11245 19446 51500
GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 66000 66388 71600
GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 21000 127488 41300
KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 21500 96072 43900
KUTCH LIG TPS 4 GSECL THERMAL-LIG 7500 29841 56400
SIKKA TPS 3-4 GSECL THERMAL-COAL 50000 184966 58800
UKAI 1-5 GSECL THERMAL-COAL 85000 204891 46900
UKAI TPS 6 GSECL THERMAL-COAL 50000 284448 48200
WANAKBORI TPS 1-6 GSECL THERMAL-COAL 126000 271999 58300
WANAKBORI TPS 7 GSECL THERMAL-COAL 21000 82808 44100
KADANA HPS GSECL HYDRO-HYDRO 24200 34433 16800
UKAI HPS GSECL HYDRO-HYDRO 30500 40585 6100
TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 31500 123000 11500
BANSAGAR-II MPPGCL HYDRO-HYDRO 3000 8900 10900
BANSAGAR- III MPPGCL HYDRO-HYDRO 6000 7200 27500
JHINNA HPS MPPGCL HYDRO-HYDRO 2000 9700 18500
RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 9000 44300 3400
GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 11500 17300 4600
SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 2000 4100 16900
MADHIKHERA HPS MPPGCL HYDRO-HYDRO 6000 14600 27000
PENCH HPS MPPGCL HYDRO-HYDRO 16000 23700 8100
RAJGHAT HPS MPPGCL HYDRO-HYDRO 4500 3000 16900
AMARKANTAK PH III MPPGCL THERMAL-COAL 21000 134400 35100
SANJAY GANDHI TPHSGTPS PH-IampII MPPGCL THERMAL-COAL 84000 283800 38700
SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 50000 344600 34300
SATPURA TPH STPS PH IIampIII MPPGCL THERMAL-COAL 83000 111600 61600
SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 50000 211800 58000
SSTPS PH-I MPPGCL THERMAL-COAL 120000 233100 84300
BHUSAWAL TPS MSPGCL THERMAL-COAL 142000 566258 51100
CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 234000 1365682 33700
KHAPERKHEDA MSPGCL THERMAL-COAL 134000 706207 39100
KORADI TPS MSPGCL THERMAL-COAL 62000 443206 42000
NASIK TPS MSPGCL THERMAL-COAL 63000 297275 47000
PARLI TPS MSPGCL THERMAL-COAL 113000 175934 71600
PARAS MSPGCL THERMAL-COAL 50000 267931 38700
URAN CCPP MSPGCL THERMAL-GAS 67200 320330 30600
KOYANA MSPGCL HYDRO-HYDRO 195600 328155 13100
SMALL HYDRO POWER PLANTS MSPGCL HYDRO-HYDRO 45400 93062 30500
BHIRA MSPGCL HYDRO-HYDRO 8000 10046 8400
TILLARI MSPGCL HYDRO-HYDRO 8900 10584 3100
SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 120000 233298 20500
SSP-CANAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 25000 87633 20500
PRIVATE SECTOR
Page 36
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 81282 46750
JNSTPP(JAYPEE NIGRIE) JP POWER VENTURES LTD THERMAL-COAL 132000 726695 29310
MB POWER MB POWER THERMAL-COAL 120000 345632 38310
ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 754922 28671
ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 780761 23495
ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 198000 1263784 32090
ADANI POWER MAHARA ADANI POWER LTD THERMAL-COAL 330000 1666191 34124
AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 170065 36827
SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 252035 45129
ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 458551 36000
ESSAR POWER MP LTD ESSAR POWER MP LTD THERMAL-COAL 60000 243040 28600
VEDANTA LTD (P P -I) VEDANTA LTD THERMAL-GAS 3000 15044 24000
VEDANTA LTD (P P -II) VEDANTA LTD THERMAL-GAS 3000 21293 24000
PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 8234600 24000
165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 5850 64390
145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 68717 40349
SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 132655 28776
SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 144686 38567
MUNDRA UMPPCOASTAL GUJARAT POWER
LTD THERMAL-IMP COAL 400000 2530300
23900
LANCO AMARKANTAK TPP PATHADIH
U-ILANCO AMARKAN POWER LTD THERMAL-COAL 30000 195500
29200
LANCO AMARKANTAK TPP PATHADIH
U-IILANCO AMARKAN POWER LTD THERMAL-COAL 30000 206900
27600
BARADARHA TPS D B POWER LTD THERMAL-COAL 120000 677373 29200
JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 405000 28900
JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 453000 40500
DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 339437 40700
TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 293400 44000
TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 137200 37000
TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 174900 44000
BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 92900 14100
BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23700 34300
KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 27600 48300
CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2530300 23900
BHANDARDRA HEP -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 2475 54900
SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 161400 26500
SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 445000 39000
SOTHERN REGION
CENTRAL SECTOR
NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 325699 54820
NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 305532 39880
NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 998805 38510
NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 113016 54070
NEYVELI TAMILNADU POWER LTD JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 625274 42200
VALLUR TPS NTPC TECL THERMAL-COAL 150000 856438 42350
R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 1493 84300
RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1502919 29400
RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 341291 31800
SIMHADRI I NTPC LTD THERMAL-COAL 100000 688382 36800
SIMHADRI II NTPC LTD THERMAL-COAL 100000 663657 43400
KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 593110 31324
MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 291625 21764
KKNPP-1 amp 2 NPCIL NUCLEAR-NUCLEAR 200000 572609 40948
MINICOY LAKSHADEEP THERMAL-DIESEL 340 770 29600
KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1097 29600
AMINI LAKSHADEEP THERMAL-DIESEL 265 509 29600
ANDROTT LAKSHADEEP THERMAL-DIESEL 219 524 29600
KALPENI LAKSHADEEP THERMAL-DIESEL 175 356 29600
AGATTI LAKSHADEEP THERMAL-DIESEL 195 658 29600
KADMAT LAKSHADEEP THERMAL-DIESEL 190 414 29600
KILTAN LAKSHADEEP THERMAL-DIESEL 150 269 29600
CHETLET LAKSHADEEP THERMAL-DIESEL 100 139 29600
BITRA LAKSHADEEP THERMAL-DIESEL 043 024 29600
BANGARAM LAKSHADEEP THERMAL-DIESEL 018 009 29600
Page 37
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) STATE SECTOR
Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 721811 46500
Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 50000 336142 46500
RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 237358 46500
RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 239926 46500
RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 124500 46500
SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 62109 46500
UPPER SILERU APGENCO HYDRO-HYDRO 24000 33000 46500
LOWER SILERU APGENCO HYDRO-HYDRO 46000 81066 46500
DONKARAI APGENCO HYDRO-HYDRO 2500 6007 46500
PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 1262 46500
CHETTIPETA APGENCO HYDRO-HYDRO 100 214 46500
MUCHKUND APGENCO HYDRO-HYDRO 12000 37571 46500
NAGARJUNASAGAR RCPH APGENCO HYDRO-HYDRO 9000 606 46500
TUNGABHADRA HES amp HAMPI(AP
Share)
APGENCO HYDRO-HYDRO 7200 6100 46500
KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 352232 42600
KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 288131 32500
KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 319272 46500
RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 40073 44300
KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 308317 46000
KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 308963 51300
SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 61004 76600
NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 17960 75300
PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 20873 58300
POCHAMPAD-I TSPGENCO HYDRO-HYDRO 2700 5455 29800
POCHAMPAD-II TSPGENCO HYDRO-HYDRO 900 1932 40700
NIZAMSAGAR TSPGENCO HYDRO-HYDRO 1000 1126 53400
RAICHUR TPS 1 to 7 KPCL THERMAL-COAL 147000 890866 43800
RAICHUR TPS 8 KPCL THERMAL-COAL 25000 159523 48200
BELLARI TPS 1 KPCL THERMAL-COAL 50000 318679 51100
BELLARI TPS 2 KPCL THERMAL-COAL 50000 232347 55600
BELLARI TPS 3 KPCL THERMAL-COAL 70000 47565 34400
BHADRA PH KPCL HYDRO-HYDRO 3920 2369 45900
GERUSUPPA PH KPCL HYDRO-HYDRO 24000 26990 22000
GHAT PRABHA HEP KPCL HYDRO-HYDRO 3200 4777 25300
KADRA HPS KPCL HYDRO-HYDRO 15000 16889 26800
NAGJHARI KPCL HYDRO-HYDRO 90000 155159 9800
KODASALLI DPH KPCL HYDRO-HYDRO 12000 14854 19200
MUNIRA+MGH+SPH+SPH KPCL HYDRO-HYDRO 22640 48211 7900
SHARAVATHY HPS KPCL HYDRO-HYDRO 108550 276215 5400
ALMATTI DPH KPCL HYDRO-HYDRO 29000 39611 24600
VARAHI UGPH KPCL HYDRO-HYDRO 46000 71368 15600
IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 17196 15300
IDUKKI HPS KSEB HYDRO-HYDRO 78000 137905 15300
KAKKAD HPS KSEB HYDRO-HYDRO 5000 13063 15300
KALLADA HPS KSEB HYDRO-HYDRO 1500 4436 15300
KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 46544 15300
KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 635 15300
LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 30822 15300
MALANKARA HPS KSEB HYDRO-HYDRO 1050 2474 15300
MATTUPETTY KSEB HYDRO-HYDRO 200 230 15300
MALAMPUZHA KSEB HYDRO-HYDRO 250 063 15300
CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 864 15300
URUMI ST I amp II KSEB HYDRO-HYDRO 615 903 15300
LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 248 15300
NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7765 19625 15300
PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 16601 15300
PANNIAR HPS KSEB HYDRO-HYDRO 3240 6217 15300
PORINGALKUTHU KSEB HYDRO-HYDRO 3600 10052 15300
PORINGALKUTHU LBE KSEB HYDRO-HYDRO 1600 9438 15300
PEPPARA KSEB HYDRO-HYDRO 300 395 15300
POOZHITHODE KSEB HYDRO-HYDRO 480 1045 15300
Page 38
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) PEECHI KSEB HYDRO-HYDRO 125 040 15300
RANI-PERUNADU KSEB HYDRO-HYDRO 400 585 15300
SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 79783 15300
SENGULAM HPS KSEB HYDRO-HYDRO 5120 11558 15300
SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 16711 15300
VILANGAD KSEB HYDRO-HYDRO 750 1578 15300
BARAPOLE KSEB HYDRO-HYDRO 1500 1932 15300
VELLATHOOVAL KSEB HYDRO-HYDRO 360 305 15300
CHIM0NY KSEB HYDRO-HYDRO 250 156 15300
ADYANPARA KSEB HYDRO-HYDRO 350 501 15300
BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 554 15300
KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 3801 15300
KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 23132 32800
ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 14416 62280
METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 523970 62280
METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 321270 62280
NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 336575 62280
NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 591240 62280
TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 508966 62280
KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 30897 62280
VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 18720 90699 62280
KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 33593 62280
BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 1047 62280
PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 1250 62280
PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 330 62280
MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 4897 62280
MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 032 62280
KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15681 62280
KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 40608 62280
KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 21342 62280
KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 4717 62280
KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4322 62280
KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2399 62280
METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 4416 62280
METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 8035 62280
BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2187 62280
BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2359 62280
BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2511 62280
BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 1949 62280
BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 1819 62280
POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 172 62280
SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 241 62280
MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 026 62280
THIRUMOORTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 136 62280
PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 9309 62280
VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 353 62280
SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 4192 62280
PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 6571 62280
SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 1186 62280
SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6319 62280
ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 6122 62280
KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 28674 62280
SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 18381 62280
SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 4258 62280
KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 12680 62280
KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4201 62280
ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 000 62280
PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 19175 62280
AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 078 62280
BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 504 62280
BHAVANI KATTALAI (BKB)(IIIampIII BB I amp II)TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 5847 62280
PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 000 62280
Page 39
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) SRI DAMODARAM STPS APPDCL THERMAL-COAL 160000 808108 36300
PRIVATE SECTOR
KARUPPUR TANJORE LANCO TANJORE PCL THERMAL-GAS 12000 48096 28770
SIMHAPURI ENERGY LTD SIMHAPURI ENERGY LTD THERMAL-COAL 60000 143900 39100
JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 7111 45500
SBU 1 JSW ENERGY LTD
VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 26000 159100
43300
SBU 2 JSW ENERGY LTD
VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 60000 247900
42800
LANCO KPLLANCO KONDAPALLI POWER
LTDTHERMAL-GAS 36814 85060
25776
LANCO KPL STG -IILANCO KONDAPALLI POWER
LTDTHERMAL-GAS 36600 12979
46330
LANCO KPL STG -IIIALANCO KONDAPALLI POWER
LTDTHERMAL-GAS 37100 85710
46330
LANCO KPL STG -III BLANCO KONDAPALLI POWER
LTDTHERMAL-GAS 37100 43639
46330
HINDUJA NATIONAL PCL HINDUJA NATIONAL PCL THERMAL-COAL 104000 303000 38200
MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 121164 49940
UDUPI POWER COR LTD ADANI POWER LTD THERMAL-COAL 120000 754613 42500
SPECTRUM POWER GENERATION
LTD SPECTRUM PG LTD THERMAL-GASN 20525 9256812
34952
TAQA NEYVELI POWER COM PVT
LTD TAQA NEYVELI THERMAL-LIG 25000 5840
34500
ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 251000 51000
ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 207860 36800
GMR VEMAGIRI POWER GENERATION
LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 30117
46450
EASTERN REGION
CENTRAL SECTOR
MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 64675 53113
MTPS STAGE - II KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 39000 1432 69138
BOKARO `B` TPS DVC THERMAL-COAL 63000 145670 31539
MEJIA TPS U 1-3 DVC THERMAL-COAL 63000 348298 31552
MEJIA TPS U 4 DVC THERMAL-COAL 21000 116099 34997
MEJIA TPS U 5-6 DVC THERMAL-COAL 50000 276427 35976
MEJIA TPS U 7-8 DVC THERMAL-COAL 100000 552854 36991
DURGAPUR STEEL TPS DVC THERMAL-COAL 100000 665550 39323
DURGAPUR TPS DVC THERMAL-COAL 21000 59270 35416
RAGHUNATHPUR TPS DVC THERMAL-COAL 120000 201650 35326
MAITHON HYDEL STA DVC HYDRO-HYDRO 6320 12200 17984
CHANDRAPURA TPSU1-3 DVC THERMAL-COAL 42000 257610 35095
CHANDRAPURA TPSU7-8 DVC THERMAL-COAL 50000 306673 34987
KODERMA TPS DVC THERMAL-COAL 100000 380180 38131
PANCHET HPS DVC HYDRO-HYDRO 8000 13360 17984
TILLAYA HPS DVC HYDRO-HYDRO 400 1410 17984
RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34700 35400
TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 277300 23200
TLDP -III NHPC LTD HYDRO-HYDRO 13200 55400 62000
TLDP -IV NHPC LTD HYDRO-HYDRO 16000 60300 25600
FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 957219 33700
FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 308943 41000
BONGAINGAON TPS NTPC LTD THERMAL-COAL 25000 153663 58600
KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 542277 34200
KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 942591 34200
BARH-II NTPC LTD THERMAL-COAL 132000 728021 44500
TALCHER TPS NTPC LTD THERMAL-COAL 46000 335521 30100
TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 702319 25600
TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1436521 24700
STATE SECTOR
BTPS(RampM) BIHAR STATE PGCL THERMAL-COAL 22000 12142 39700
BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 98331 10602
HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 50593 9482
CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 19689 2605
RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 53192 6033
UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 147208 14637
Page 40
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 60353 4519
IB TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 288567 25000
J P H GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 210 038 61100
MEYONG CHU GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 400 1086 61100
TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 122667 38200
DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 214339 43321
KOLAGHAT THERMAL POWER
STATION
WEST BENGAL PDCL THERMAL-COAL 126000 538269 31603
BAKRESHWAR THERMAL POWER
PLANT
WEST BENGAL PDCL THERMAL-COAL 105000 634876 32154
BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 45000 166855 33299
SANTHALDIH THERMAL POWER
STATION
WEST BENGAL PDCL THERMAL-COAL 50000 336442 34932
SAGARDIGHI THERMAL POWER
PROJECT
WEST BENGAL PDCL THERMAL-COAL 160000 423121 34705
JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 20344 68900
RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 24559 68900
TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 4623 68900
PURULIA PUMPED STORAGE
PROJECT
WEST BENGAL SEDCL HYDRO-HYDRO 90000 108816 68900
MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2768 68900
PRIVATE SECTOR
CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 49474 20230
CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 555500 70200
HALDIA ENERGY HALDIA ENERGY LTD THERMAL-COAL 60000 371000 50400
DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3688 63400
KAMALANGA TPS GMR KAMALANGA ENERGY LTD THERMAL-COAL 105000547670
33300
ADHUNIK POWER U-1 ADHUNIK POWER THERMAL-COAL 27000 158 44060
ADHUNIK POWER U-2 ADHUNIK POWER THERMAL-COAL 27000 168 44250
VL-JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 332800 23622
JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 43000 45250
JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 71700 37030
JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 70700 35920
JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 71100 38870
JOJOBERA UNIT 5 TATA POWER COM LTD THERMAL-COAL 12000 79300 44560
JOJOBERA UNIT 6 TATA POWER COM LTD THERMAL-WHR 12000 83700 12840
IEL KALINGANAGAR U-I TATA POWER COM LTD THERMAL-WG 6750 33400 22500
IEL KALINGANAGAR U-II TATA POWER COM LTD THERMAL-WG 6750 34800 22500
MAITHON UNIT 1 amp 2 TATA POWER COM LTD THERMAL-COAL 105000 678000 36100
HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 27500 24340
HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 28400 24340
HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 15800 24310
NORTH EASTERN REGION
CENTRAL SECTOR
LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 74100 36600
AGARTALA GT NEEPCO THERMAL-GAS 13500 88611 27210
ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 153111 32310
DOYANG HEP NEEPCO HYDRO-HYDRO 7500 25598 49801
KOPILI HEP NEEPCO HYDRO-HYDRO 20000 98186 11491
KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 19582 20237
KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 10310 17968
RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 124093 22945
TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 10100 17344 39000
STATE SECTOR
HYDRO POWER (122 Stns) ITANAGAR GOVT OF ARUNACHAL
PRADESHHYDRO-HYDRO 6971 6217270
24600
KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39514 17337
LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 82327 36810
NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 33318 48290
MYNTRIANG SHEP ST II ASSAM POWER GENCO HYDRO-HYDRO 300 567 35776
LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 9130 49200
LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 012 49200
DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 022 49200
TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 000 49200
UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 4990 16000
UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 6476 37000
UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 16494 14600
UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 3600 9556 15000
SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 758 8000
MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44070 44800
KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 154 41400
TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 091 41400
MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 411 41400
MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 394 41400
KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 760 41400
SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 3264 41400
LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 044 41400
BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 18953 28000
ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 43585 28200
GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 4080 11100
Note
LIG Lignite N Naptha WHR Waste Heat Recovery
Page 41
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) JP BINA TPP JP POWER VENTURES LTD THERMAL-COAL 50000 81282 46750
JNSTPP(JAYPEE NIGRIE) JP POWER VENTURES LTD THERMAL-COAL 132000 726695 29310
MB POWER MB POWER THERMAL-COAL 120000 345632 38310
ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 754922 28671
ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 132000 780761 23495
ADANI POWER MUNDRA ADANI POWER LTD THERMAL-COAL 198000 1263784 32090
ADANI POWER MAHARA ADANI POWER LTD THERMAL-COAL 330000 1666191 34124
AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 135000 170065 36827
SABARMATI THERMAL POWER STAN TORRENT POWER LTD THERMAL-COAL 42200 252035 45129
ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 120000 458551 36000
ESSAR POWER MP LTD ESSAR POWER MP LTD THERMAL-COAL 60000 243040 28600
VEDANTA LTD (P P -I) VEDANTA LTD THERMAL-GAS 3000 15044 24000
VEDANTA LTD (P P -II) VEDANTA LTD THERMAL-GAS 3000 21293 24000
PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 1200 8234600 24000
165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 16500 5850 64390
145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 14500 68717 40349
SURAT LIG P P (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 132655 28776
SURAT LIG P P (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 25000 144686 38567
MUNDRA UMPPCOASTAL GUJARAT POWER
LTD THERMAL-IMP COAL 400000 2530300
23900
LANCO AMARKANTAK TPP PATHADIH
U-ILANCO AMARKAN POWER LTD THERMAL-COAL 30000 195500
29200
LANCO AMARKANTAK TPP PATHADIH
U-IILANCO AMARKAN POWER LTD THERMAL-COAL 30000 206900
27600
BARADARHA TPS D B POWER LTD THERMAL-COAL 120000 677373 29200
JINDAL POWER LTD STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 100000 405000 28900
JINDAL POWER LTD STPPS-Ii JINDAL POWER LTD TAMNAR THERMAL-COAL 240000 453000 40500
DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 50000 339437 40700
TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 50000 293400 44000
TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 18000 137200 37000
TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 25000 174900 44000
BHIRA TATA POWER COM LTD HYDRO-HYDRO 30000 92900 14100
BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 7500 23700 34300
KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 7200 27600 48300
CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 400000 2530300 23900
BHANDARDRA HEP -II DODSON LINDBLOM HYDRO HYDRO-HYDRO 3400 2475 54900
SBU 3 JSW ENERGY LTD U-I JSW ENERGY LTD THERMAL-IMP COAL 30000 161400 26500
SBU 3 JSW ENERGY LTD U 2 to 3 JSW ENERGY LTD THERMAL-IMP COAL 90000 445000 39000
SOTHERN REGION
CENTRAL SECTOR
NEYVELI TPS I NEYVELI LIG CORP LTD THERMAL-LIG 60000 325699 54820
NEYVELI TPS- I EXPN NEYVELI LIG CORP LTD THERMAL-LIG 42000 305532 39880
NEYVELI TPS-II NEYVELI LIG CORP LTD THERMAL-LIG 147000 998805 38510
NEYVELI TPS-II EXPN NEYVELI LIG CORP LTD THERMAL-LIG 50000 113016 54070
NEYVELI TAMILNADU POWER LTD JV NEYVELI LIG CORP LTD THERMAL-LIG 100000 625274 42200
VALLUR TPS NTPC TECL THERMAL-COAL 150000 856438 42350
R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 35958 1493 84300
RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 210000 1502919 29400
RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 50000 341291 31800
SIMHADRI I NTPC LTD THERMAL-COAL 100000 688382 36800
SIMHADRI II NTPC LTD THERMAL-COAL 100000 663657 43400
KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 88000 593110 31324
MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 44000 291625 21764
KKNPP-1 amp 2 NPCIL NUCLEAR-NUCLEAR 200000 572609 40948
MINICOY LAKSHADEEP THERMAL-DIESEL 340 770 29600
KAVARATTI LAKSHADEEP THERMAL-DIESEL 320 1097 29600
AMINI LAKSHADEEP THERMAL-DIESEL 265 509 29600
ANDROTT LAKSHADEEP THERMAL-DIESEL 219 524 29600
KALPENI LAKSHADEEP THERMAL-DIESEL 175 356 29600
AGATTI LAKSHADEEP THERMAL-DIESEL 195 658 29600
KADMAT LAKSHADEEP THERMAL-DIESEL 190 414 29600
KILTAN LAKSHADEEP THERMAL-DIESEL 150 269 29600
CHETLET LAKSHADEEP THERMAL-DIESEL 100 139 29600
BITRA LAKSHADEEP THERMAL-DIESEL 043 024 29600
BANGARAM LAKSHADEEP THERMAL-DIESEL 018 009 29600
Page 37
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) STATE SECTOR
Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 721811 46500
Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 50000 336142 46500
RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 237358 46500
RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 239926 46500
RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 124500 46500
SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 62109 46500
UPPER SILERU APGENCO HYDRO-HYDRO 24000 33000 46500
LOWER SILERU APGENCO HYDRO-HYDRO 46000 81066 46500
DONKARAI APGENCO HYDRO-HYDRO 2500 6007 46500
PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 1262 46500
CHETTIPETA APGENCO HYDRO-HYDRO 100 214 46500
MUCHKUND APGENCO HYDRO-HYDRO 12000 37571 46500
NAGARJUNASAGAR RCPH APGENCO HYDRO-HYDRO 9000 606 46500
TUNGABHADRA HES amp HAMPI(AP
Share)
APGENCO HYDRO-HYDRO 7200 6100 46500
KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 352232 42600
KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 288131 32500
KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 319272 46500
RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 40073 44300
KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 308317 46000
KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 308963 51300
SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 61004 76600
NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 17960 75300
PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 20873 58300
POCHAMPAD-I TSPGENCO HYDRO-HYDRO 2700 5455 29800
POCHAMPAD-II TSPGENCO HYDRO-HYDRO 900 1932 40700
NIZAMSAGAR TSPGENCO HYDRO-HYDRO 1000 1126 53400
RAICHUR TPS 1 to 7 KPCL THERMAL-COAL 147000 890866 43800
RAICHUR TPS 8 KPCL THERMAL-COAL 25000 159523 48200
BELLARI TPS 1 KPCL THERMAL-COAL 50000 318679 51100
BELLARI TPS 2 KPCL THERMAL-COAL 50000 232347 55600
BELLARI TPS 3 KPCL THERMAL-COAL 70000 47565 34400
BHADRA PH KPCL HYDRO-HYDRO 3920 2369 45900
GERUSUPPA PH KPCL HYDRO-HYDRO 24000 26990 22000
GHAT PRABHA HEP KPCL HYDRO-HYDRO 3200 4777 25300
KADRA HPS KPCL HYDRO-HYDRO 15000 16889 26800
NAGJHARI KPCL HYDRO-HYDRO 90000 155159 9800
KODASALLI DPH KPCL HYDRO-HYDRO 12000 14854 19200
MUNIRA+MGH+SPH+SPH KPCL HYDRO-HYDRO 22640 48211 7900
SHARAVATHY HPS KPCL HYDRO-HYDRO 108550 276215 5400
ALMATTI DPH KPCL HYDRO-HYDRO 29000 39611 24600
VARAHI UGPH KPCL HYDRO-HYDRO 46000 71368 15600
IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 17196 15300
IDUKKI HPS KSEB HYDRO-HYDRO 78000 137905 15300
KAKKAD HPS KSEB HYDRO-HYDRO 5000 13063 15300
KALLADA HPS KSEB HYDRO-HYDRO 1500 4436 15300
KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 46544 15300
KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 635 15300
LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 30822 15300
MALANKARA HPS KSEB HYDRO-HYDRO 1050 2474 15300
MATTUPETTY KSEB HYDRO-HYDRO 200 230 15300
MALAMPUZHA KSEB HYDRO-HYDRO 250 063 15300
CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 864 15300
URUMI ST I amp II KSEB HYDRO-HYDRO 615 903 15300
LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 248 15300
NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7765 19625 15300
PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 16601 15300
PANNIAR HPS KSEB HYDRO-HYDRO 3240 6217 15300
PORINGALKUTHU KSEB HYDRO-HYDRO 3600 10052 15300
PORINGALKUTHU LBE KSEB HYDRO-HYDRO 1600 9438 15300
PEPPARA KSEB HYDRO-HYDRO 300 395 15300
POOZHITHODE KSEB HYDRO-HYDRO 480 1045 15300
Page 38
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) PEECHI KSEB HYDRO-HYDRO 125 040 15300
RANI-PERUNADU KSEB HYDRO-HYDRO 400 585 15300
SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 79783 15300
SENGULAM HPS KSEB HYDRO-HYDRO 5120 11558 15300
SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 16711 15300
VILANGAD KSEB HYDRO-HYDRO 750 1578 15300
BARAPOLE KSEB HYDRO-HYDRO 1500 1932 15300
VELLATHOOVAL KSEB HYDRO-HYDRO 360 305 15300
CHIM0NY KSEB HYDRO-HYDRO 250 156 15300
ADYANPARA KSEB HYDRO-HYDRO 350 501 15300
BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 554 15300
KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 3801 15300
KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 23132 32800
ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 14416 62280
METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 523970 62280
METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 321270 62280
NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 336575 62280
NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 591240 62280
TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 508966 62280
KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 30897 62280
VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 18720 90699 62280
KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 33593 62280
BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 1047 62280
PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 1250 62280
PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 330 62280
MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 4897 62280
MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 032 62280
KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15681 62280
KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 40608 62280
KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 21342 62280
KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 4717 62280
KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4322 62280
KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2399 62280
METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 4416 62280
METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 8035 62280
BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2187 62280
BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2359 62280
BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2511 62280
BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 1949 62280
BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 1819 62280
POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 172 62280
SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 241 62280
MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 026 62280
THIRUMOORTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 136 62280
PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 9309 62280
VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 353 62280
SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 4192 62280
PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 6571 62280
SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 1186 62280
SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6319 62280
ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 6122 62280
KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 28674 62280
SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 18381 62280
SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 4258 62280
KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 12680 62280
KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4201 62280
ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 000 62280
PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 19175 62280
AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 078 62280
BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 504 62280
BHAVANI KATTALAI (BKB)(IIIampIII BB I amp II)TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 5847 62280
PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 000 62280
Page 39
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) SRI DAMODARAM STPS APPDCL THERMAL-COAL 160000 808108 36300
PRIVATE SECTOR
KARUPPUR TANJORE LANCO TANJORE PCL THERMAL-GAS 12000 48096 28770
SIMHAPURI ENERGY LTD SIMHAPURI ENERGY LTD THERMAL-COAL 60000 143900 39100
JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 7111 45500
SBU 1 JSW ENERGY LTD
VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 26000 159100
43300
SBU 2 JSW ENERGY LTD
VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 60000 247900
42800
LANCO KPLLANCO KONDAPALLI POWER
LTDTHERMAL-GAS 36814 85060
25776
LANCO KPL STG -IILANCO KONDAPALLI POWER
LTDTHERMAL-GAS 36600 12979
46330
LANCO KPL STG -IIIALANCO KONDAPALLI POWER
LTDTHERMAL-GAS 37100 85710
46330
LANCO KPL STG -III BLANCO KONDAPALLI POWER
LTDTHERMAL-GAS 37100 43639
46330
HINDUJA NATIONAL PCL HINDUJA NATIONAL PCL THERMAL-COAL 104000 303000 38200
MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 121164 49940
UDUPI POWER COR LTD ADANI POWER LTD THERMAL-COAL 120000 754613 42500
SPECTRUM POWER GENERATION
LTD SPECTRUM PG LTD THERMAL-GASN 20525 9256812
34952
TAQA NEYVELI POWER COM PVT
LTD TAQA NEYVELI THERMAL-LIG 25000 5840
34500
ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 251000 51000
ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 207860 36800
GMR VEMAGIRI POWER GENERATION
LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 30117
46450
EASTERN REGION
CENTRAL SECTOR
MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 64675 53113
MTPS STAGE - II KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 39000 1432 69138
BOKARO `B` TPS DVC THERMAL-COAL 63000 145670 31539
MEJIA TPS U 1-3 DVC THERMAL-COAL 63000 348298 31552
MEJIA TPS U 4 DVC THERMAL-COAL 21000 116099 34997
MEJIA TPS U 5-6 DVC THERMAL-COAL 50000 276427 35976
MEJIA TPS U 7-8 DVC THERMAL-COAL 100000 552854 36991
DURGAPUR STEEL TPS DVC THERMAL-COAL 100000 665550 39323
DURGAPUR TPS DVC THERMAL-COAL 21000 59270 35416
RAGHUNATHPUR TPS DVC THERMAL-COAL 120000 201650 35326
MAITHON HYDEL STA DVC HYDRO-HYDRO 6320 12200 17984
CHANDRAPURA TPSU1-3 DVC THERMAL-COAL 42000 257610 35095
CHANDRAPURA TPSU7-8 DVC THERMAL-COAL 50000 306673 34987
KODERMA TPS DVC THERMAL-COAL 100000 380180 38131
PANCHET HPS DVC HYDRO-HYDRO 8000 13360 17984
TILLAYA HPS DVC HYDRO-HYDRO 400 1410 17984
RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34700 35400
TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 277300 23200
TLDP -III NHPC LTD HYDRO-HYDRO 13200 55400 62000
TLDP -IV NHPC LTD HYDRO-HYDRO 16000 60300 25600
FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 957219 33700
FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 308943 41000
BONGAINGAON TPS NTPC LTD THERMAL-COAL 25000 153663 58600
KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 542277 34200
KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 942591 34200
BARH-II NTPC LTD THERMAL-COAL 132000 728021 44500
TALCHER TPS NTPC LTD THERMAL-COAL 46000 335521 30100
TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 702319 25600
TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1436521 24700
STATE SECTOR
BTPS(RampM) BIHAR STATE PGCL THERMAL-COAL 22000 12142 39700
BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 98331 10602
HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 50593 9482
CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 19689 2605
RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 53192 6033
UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 147208 14637
Page 40
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 60353 4519
IB TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 288567 25000
J P H GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 210 038 61100
MEYONG CHU GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 400 1086 61100
TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 122667 38200
DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 214339 43321
KOLAGHAT THERMAL POWER
STATION
WEST BENGAL PDCL THERMAL-COAL 126000 538269 31603
BAKRESHWAR THERMAL POWER
PLANT
WEST BENGAL PDCL THERMAL-COAL 105000 634876 32154
BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 45000 166855 33299
SANTHALDIH THERMAL POWER
STATION
WEST BENGAL PDCL THERMAL-COAL 50000 336442 34932
SAGARDIGHI THERMAL POWER
PROJECT
WEST BENGAL PDCL THERMAL-COAL 160000 423121 34705
JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 20344 68900
RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 24559 68900
TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 4623 68900
PURULIA PUMPED STORAGE
PROJECT
WEST BENGAL SEDCL HYDRO-HYDRO 90000 108816 68900
MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2768 68900
PRIVATE SECTOR
CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 49474 20230
CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 555500 70200
HALDIA ENERGY HALDIA ENERGY LTD THERMAL-COAL 60000 371000 50400
DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3688 63400
KAMALANGA TPS GMR KAMALANGA ENERGY LTD THERMAL-COAL 105000547670
33300
ADHUNIK POWER U-1 ADHUNIK POWER THERMAL-COAL 27000 158 44060
ADHUNIK POWER U-2 ADHUNIK POWER THERMAL-COAL 27000 168 44250
VL-JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 332800 23622
JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 43000 45250
JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 71700 37030
JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 70700 35920
JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 71100 38870
JOJOBERA UNIT 5 TATA POWER COM LTD THERMAL-COAL 12000 79300 44560
JOJOBERA UNIT 6 TATA POWER COM LTD THERMAL-WHR 12000 83700 12840
IEL KALINGANAGAR U-I TATA POWER COM LTD THERMAL-WG 6750 33400 22500
IEL KALINGANAGAR U-II TATA POWER COM LTD THERMAL-WG 6750 34800 22500
MAITHON UNIT 1 amp 2 TATA POWER COM LTD THERMAL-COAL 105000 678000 36100
HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 27500 24340
HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 28400 24340
HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 15800 24310
NORTH EASTERN REGION
CENTRAL SECTOR
LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 74100 36600
AGARTALA GT NEEPCO THERMAL-GAS 13500 88611 27210
ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 153111 32310
DOYANG HEP NEEPCO HYDRO-HYDRO 7500 25598 49801
KOPILI HEP NEEPCO HYDRO-HYDRO 20000 98186 11491
KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 19582 20237
KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 10310 17968
RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 124093 22945
TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 10100 17344 39000
STATE SECTOR
HYDRO POWER (122 Stns) ITANAGAR GOVT OF ARUNACHAL
PRADESHHYDRO-HYDRO 6971 6217270
24600
KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39514 17337
LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 82327 36810
NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 33318 48290
MYNTRIANG SHEP ST II ASSAM POWER GENCO HYDRO-HYDRO 300 567 35776
LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 9130 49200
LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 012 49200
DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 022 49200
TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 000 49200
UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 4990 16000
UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 6476 37000
UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 16494 14600
UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 3600 9556 15000
SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 758 8000
MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44070 44800
KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 154 41400
TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 091 41400
MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 411 41400
MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 394 41400
KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 760 41400
SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 3264 41400
LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 044 41400
BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 18953 28000
ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 43585 28200
GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 4080 11100
Note
LIG Lignite N Naptha WHR Waste Heat Recovery
Page 41
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) STATE SECTOR
Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 126000 721811 46500
Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 50000 336142 46500
RAYALASEEMA T P P-I APGENCO THERMAL-COAL 42000 237358 46500
RAYALASEEMA T P P-II APGENCO THERMAL-COAL 42000 239926 46500
RAYALASEEMA T P P-III APGENCO THERMAL-COAL 21000 124500 46500
SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 77000 62109 46500
UPPER SILERU APGENCO HYDRO-HYDRO 24000 33000 46500
LOWER SILERU APGENCO HYDRO-HYDRO 46000 81066 46500
DONKARAI APGENCO HYDRO-HYDRO 2500 6007 46500
PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 2000 1262 46500
CHETTIPETA APGENCO HYDRO-HYDRO 100 214 46500
MUCHKUND APGENCO HYDRO-HYDRO 12000 37571 46500
NAGARJUNASAGAR RCPH APGENCO HYDRO-HYDRO 9000 606 46500
TUNGABHADRA HES amp HAMPI(AP
Share)
APGENCO HYDRO-HYDRO 7200 6100 46500
KOTHAGUDEM STA(KTPS OampM) TSPGENCO THERMAL-COAL 72000 352232 42600
KOTHAGUDEM T P S (KTPS-V) TSPGENCO THERMAL-COAL 50000 288131 32500
KOTHAGUDEM T P S (KTPS-VI) TSPGENCO THERMAL-COAL 50000 319272 46500
RAMAGUNDEM T P S B TSPGENCO THERMAL-COAL 6250 40073 44300
KAKATHIYA TPP (KTPP)-I TSPGENCO THERMAL-COAL 50000 308317 46000
KAKATHIYA TPP (KTPP)-II TSPGENCO THERMAL-COAL 60000 308963 51300
SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 90000 61004 76600
NAGARJUNASAGAR TSPGENCO HYDRO-HYDRO 81560 17960 75300
PRIYADARSHINI JURALA TSPGENCO HYDRO-HYDRO 23400 20873 58300
POCHAMPAD-I TSPGENCO HYDRO-HYDRO 2700 5455 29800
POCHAMPAD-II TSPGENCO HYDRO-HYDRO 900 1932 40700
NIZAMSAGAR TSPGENCO HYDRO-HYDRO 1000 1126 53400
RAICHUR TPS 1 to 7 KPCL THERMAL-COAL 147000 890866 43800
RAICHUR TPS 8 KPCL THERMAL-COAL 25000 159523 48200
BELLARI TPS 1 KPCL THERMAL-COAL 50000 318679 51100
BELLARI TPS 2 KPCL THERMAL-COAL 50000 232347 55600
BELLARI TPS 3 KPCL THERMAL-COAL 70000 47565 34400
BHADRA PH KPCL HYDRO-HYDRO 3920 2369 45900
GERUSUPPA PH KPCL HYDRO-HYDRO 24000 26990 22000
GHAT PRABHA HEP KPCL HYDRO-HYDRO 3200 4777 25300
KADRA HPS KPCL HYDRO-HYDRO 15000 16889 26800
NAGJHARI KPCL HYDRO-HYDRO 90000 155159 9800
KODASALLI DPH KPCL HYDRO-HYDRO 12000 14854 19200
MUNIRA+MGH+SPH+SPH KPCL HYDRO-HYDRO 22640 48211 7900
SHARAVATHY HPS KPCL HYDRO-HYDRO 108550 276215 5400
ALMATTI DPH KPCL HYDRO-HYDRO 29000 39611 24600
VARAHI UGPH KPCL HYDRO-HYDRO 46000 71368 15600
IDAMALAYAR HPS KSEB HYDRO-HYDRO 7500 17196 15300
IDUKKI HPS KSEB HYDRO-HYDRO 78000 137905 15300
KAKKAD HPS KSEB HYDRO-HYDRO 5000 13063 15300
KALLADA HPS KSEB HYDRO-HYDRO 1500 4436 15300
KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 22500 46544 15300
KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 375 635 15300
LOWER PERIYAR HPS KSEB HYDRO-HYDRO 18000 30822 15300
MALANKARA HPS KSEB HYDRO-HYDRO 1050 2474 15300
MATTUPETTY KSEB HYDRO-HYDRO 200 230 15300
MALAMPUZHA KSEB HYDRO-HYDRO 250 063 15300
CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 645 864 15300
URUMI ST I amp II KSEB HYDRO-HYDRO 615 903 15300
LOWER MEENMUTTY KSEB HYDRO-HYDRO 350 248 15300
NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 7765 19625 15300
PALLIVASAL HPS KSEB HYDRO-HYDRO 3750 16601 15300
PANNIAR HPS KSEB HYDRO-HYDRO 3240 6217 15300
PORINGALKUTHU KSEB HYDRO-HYDRO 3600 10052 15300
PORINGALKUTHU LBE KSEB HYDRO-HYDRO 1600 9438 15300
PEPPARA KSEB HYDRO-HYDRO 300 395 15300
POOZHITHODE KSEB HYDRO-HYDRO 480 1045 15300
Page 38
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) PEECHI KSEB HYDRO-HYDRO 125 040 15300
RANI-PERUNADU KSEB HYDRO-HYDRO 400 585 15300
SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 79783 15300
SENGULAM HPS KSEB HYDRO-HYDRO 5120 11558 15300
SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 16711 15300
VILANGAD KSEB HYDRO-HYDRO 750 1578 15300
BARAPOLE KSEB HYDRO-HYDRO 1500 1932 15300
VELLATHOOVAL KSEB HYDRO-HYDRO 360 305 15300
CHIM0NY KSEB HYDRO-HYDRO 250 156 15300
ADYANPARA KSEB HYDRO-HYDRO 350 501 15300
BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 554 15300
KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 3801 15300
KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 23132 32800
ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 14416 62280
METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 523970 62280
METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 321270 62280
NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 336575 62280
NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 591240 62280
TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 508966 62280
KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 30897 62280
VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 18720 90699 62280
KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 33593 62280
BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 1047 62280
PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 1250 62280
PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 330 62280
MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 4897 62280
MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 032 62280
KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15681 62280
KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 40608 62280
KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 21342 62280
KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 4717 62280
KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4322 62280
KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2399 62280
METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 4416 62280
METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 8035 62280
BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2187 62280
BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2359 62280
BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2511 62280
BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 1949 62280
BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 1819 62280
POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 172 62280
SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 241 62280
MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 026 62280
THIRUMOORTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 136 62280
PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 9309 62280
VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 353 62280
SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 4192 62280
PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 6571 62280
SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 1186 62280
SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6319 62280
ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 6122 62280
KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 28674 62280
SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 18381 62280
SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 4258 62280
KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 12680 62280
KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4201 62280
ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 000 62280
PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 19175 62280
AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 078 62280
BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 504 62280
BHAVANI KATTALAI (BKB)(IIIampIII BB I amp II)TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 5847 62280
PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 000 62280
Page 39
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) SRI DAMODARAM STPS APPDCL THERMAL-COAL 160000 808108 36300
PRIVATE SECTOR
KARUPPUR TANJORE LANCO TANJORE PCL THERMAL-GAS 12000 48096 28770
SIMHAPURI ENERGY LTD SIMHAPURI ENERGY LTD THERMAL-COAL 60000 143900 39100
JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 7111 45500
SBU 1 JSW ENERGY LTD
VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 26000 159100
43300
SBU 2 JSW ENERGY LTD
VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 60000 247900
42800
LANCO KPLLANCO KONDAPALLI POWER
LTDTHERMAL-GAS 36814 85060
25776
LANCO KPL STG -IILANCO KONDAPALLI POWER
LTDTHERMAL-GAS 36600 12979
46330
LANCO KPL STG -IIIALANCO KONDAPALLI POWER
LTDTHERMAL-GAS 37100 85710
46330
LANCO KPL STG -III BLANCO KONDAPALLI POWER
LTDTHERMAL-GAS 37100 43639
46330
HINDUJA NATIONAL PCL HINDUJA NATIONAL PCL THERMAL-COAL 104000 303000 38200
MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 121164 49940
UDUPI POWER COR LTD ADANI POWER LTD THERMAL-COAL 120000 754613 42500
SPECTRUM POWER GENERATION
LTD SPECTRUM PG LTD THERMAL-GASN 20525 9256812
34952
TAQA NEYVELI POWER COM PVT
LTD TAQA NEYVELI THERMAL-LIG 25000 5840
34500
ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 251000 51000
ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 207860 36800
GMR VEMAGIRI POWER GENERATION
LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 30117
46450
EASTERN REGION
CENTRAL SECTOR
MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 64675 53113
MTPS STAGE - II KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 39000 1432 69138
BOKARO `B` TPS DVC THERMAL-COAL 63000 145670 31539
MEJIA TPS U 1-3 DVC THERMAL-COAL 63000 348298 31552
MEJIA TPS U 4 DVC THERMAL-COAL 21000 116099 34997
MEJIA TPS U 5-6 DVC THERMAL-COAL 50000 276427 35976
MEJIA TPS U 7-8 DVC THERMAL-COAL 100000 552854 36991
DURGAPUR STEEL TPS DVC THERMAL-COAL 100000 665550 39323
DURGAPUR TPS DVC THERMAL-COAL 21000 59270 35416
RAGHUNATHPUR TPS DVC THERMAL-COAL 120000 201650 35326
MAITHON HYDEL STA DVC HYDRO-HYDRO 6320 12200 17984
CHANDRAPURA TPSU1-3 DVC THERMAL-COAL 42000 257610 35095
CHANDRAPURA TPSU7-8 DVC THERMAL-COAL 50000 306673 34987
KODERMA TPS DVC THERMAL-COAL 100000 380180 38131
PANCHET HPS DVC HYDRO-HYDRO 8000 13360 17984
TILLAYA HPS DVC HYDRO-HYDRO 400 1410 17984
RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34700 35400
TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 277300 23200
TLDP -III NHPC LTD HYDRO-HYDRO 13200 55400 62000
TLDP -IV NHPC LTD HYDRO-HYDRO 16000 60300 25600
FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 957219 33700
FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 308943 41000
BONGAINGAON TPS NTPC LTD THERMAL-COAL 25000 153663 58600
KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 542277 34200
KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 942591 34200
BARH-II NTPC LTD THERMAL-COAL 132000 728021 44500
TALCHER TPS NTPC LTD THERMAL-COAL 46000 335521 30100
TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 702319 25600
TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1436521 24700
STATE SECTOR
BTPS(RampM) BIHAR STATE PGCL THERMAL-COAL 22000 12142 39700
BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 98331 10602
HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 50593 9482
CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 19689 2605
RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 53192 6033
UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 147208 14637
Page 40
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 60353 4519
IB TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 288567 25000
J P H GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 210 038 61100
MEYONG CHU GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 400 1086 61100
TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 122667 38200
DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 214339 43321
KOLAGHAT THERMAL POWER
STATION
WEST BENGAL PDCL THERMAL-COAL 126000 538269 31603
BAKRESHWAR THERMAL POWER
PLANT
WEST BENGAL PDCL THERMAL-COAL 105000 634876 32154
BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 45000 166855 33299
SANTHALDIH THERMAL POWER
STATION
WEST BENGAL PDCL THERMAL-COAL 50000 336442 34932
SAGARDIGHI THERMAL POWER
PROJECT
WEST BENGAL PDCL THERMAL-COAL 160000 423121 34705
JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 20344 68900
RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 24559 68900
TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 4623 68900
PURULIA PUMPED STORAGE
PROJECT
WEST BENGAL SEDCL HYDRO-HYDRO 90000 108816 68900
MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2768 68900
PRIVATE SECTOR
CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 49474 20230
CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 555500 70200
HALDIA ENERGY HALDIA ENERGY LTD THERMAL-COAL 60000 371000 50400
DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3688 63400
KAMALANGA TPS GMR KAMALANGA ENERGY LTD THERMAL-COAL 105000547670
33300
ADHUNIK POWER U-1 ADHUNIK POWER THERMAL-COAL 27000 158 44060
ADHUNIK POWER U-2 ADHUNIK POWER THERMAL-COAL 27000 168 44250
VL-JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 332800 23622
JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 43000 45250
JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 71700 37030
JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 70700 35920
JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 71100 38870
JOJOBERA UNIT 5 TATA POWER COM LTD THERMAL-COAL 12000 79300 44560
JOJOBERA UNIT 6 TATA POWER COM LTD THERMAL-WHR 12000 83700 12840
IEL KALINGANAGAR U-I TATA POWER COM LTD THERMAL-WG 6750 33400 22500
IEL KALINGANAGAR U-II TATA POWER COM LTD THERMAL-WG 6750 34800 22500
MAITHON UNIT 1 amp 2 TATA POWER COM LTD THERMAL-COAL 105000 678000 36100
HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 27500 24340
HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 28400 24340
HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 15800 24310
NORTH EASTERN REGION
CENTRAL SECTOR
LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 74100 36600
AGARTALA GT NEEPCO THERMAL-GAS 13500 88611 27210
ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 153111 32310
DOYANG HEP NEEPCO HYDRO-HYDRO 7500 25598 49801
KOPILI HEP NEEPCO HYDRO-HYDRO 20000 98186 11491
KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 19582 20237
KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 10310 17968
RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 124093 22945
TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 10100 17344 39000
STATE SECTOR
HYDRO POWER (122 Stns) ITANAGAR GOVT OF ARUNACHAL
PRADESHHYDRO-HYDRO 6971 6217270
24600
KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39514 17337
LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 82327 36810
NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 33318 48290
MYNTRIANG SHEP ST II ASSAM POWER GENCO HYDRO-HYDRO 300 567 35776
LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 9130 49200
LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 012 49200
DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 022 49200
TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 000 49200
UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 4990 16000
UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 6476 37000
UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 16494 14600
UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 3600 9556 15000
SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 758 8000
MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44070 44800
KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 154 41400
TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 091 41400
MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 411 41400
MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 394 41400
KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 760 41400
SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 3264 41400
LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 044 41400
BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 18953 28000
ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 43585 28200
GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 4080 11100
Note
LIG Lignite N Naptha WHR Waste Heat Recovery
Page 41
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) PEECHI KSEB HYDRO-HYDRO 125 040 15300
RANI-PERUNADU KSEB HYDRO-HYDRO 400 585 15300
SABARIGIRI HPS KSEB HYDRO-HYDRO 34000 79783 15300
SENGULAM HPS KSEB HYDRO-HYDRO 5120 11558 15300
SHOLAYAR HPS KSEB HYDRO-HYDRO 5400 16711 15300
VILANGAD KSEB HYDRO-HYDRO 750 1578 15300
BARAPOLE KSEB HYDRO-HYDRO 1500 1932 15300
VELLATHOOVAL KSEB HYDRO-HYDRO 360 305 15300
CHIM0NY KSEB HYDRO-HYDRO 250 156 15300
ADYANPARA KSEB HYDRO-HYDRO 350 501 15300
BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 6396 554 15300
KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 9600 3801 15300
KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 3250 23132 32800
ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 34000 14416 62280
METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 84000 523970 62280
METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 60000 321270 62280
NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 63000 336575 62280
NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 120000 591240 62280
TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 105000 508966 62280
KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 10788 30897 62280
VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 18720 90699 62280
KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 10100 33593 62280
BBPH TN GEN amp DIS CORP LTD THERMAL-GAS 12000 1047 62280
PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 5920 1250 62280
PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 330 62280
MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3600 4897 62280
MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 075 032 62280
KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 15681 62280
KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 17500 40608 62280
KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 18000 21342 62280
KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 10000 4717 62280
KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4322 62280
KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2399 62280
METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 5000 4416 62280
METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 20000 8035 62280
BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2187 62280
BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2359 62280
BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 2511 62280
BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 1949 62280
BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 1819 62280
POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 200 172 62280
SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 750 241 62280
MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 070 026 62280
THIRUMOORTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 195 136 62280
PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 16800 9309 62280
VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 1900 353 62280
SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3500 4192 62280
PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 3200 6571 62280
SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2000 1186 62280
SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 3000 6319 62280
ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 6122 62280
KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 40000 28674 62280
SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7000 18381 62280
SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 2500 4258 62280
KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6000 12680 62280
KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4000 4201 62280
ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 250 000 62280
PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 15000 19175 62280
AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 400 078 62280
BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 800 504 62280
BHAVANI KATTALAI (BKB)(IIIampIII BB I amp II)TN GEN amp DIS CORP LTD HYDRO-HYDRO 11000 5847 62280
PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 130 000 62280
Page 39
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) SRI DAMODARAM STPS APPDCL THERMAL-COAL 160000 808108 36300
PRIVATE SECTOR
KARUPPUR TANJORE LANCO TANJORE PCL THERMAL-GAS 12000 48096 28770
SIMHAPURI ENERGY LTD SIMHAPURI ENERGY LTD THERMAL-COAL 60000 143900 39100
JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 7111 45500
SBU 1 JSW ENERGY LTD
VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 26000 159100
43300
SBU 2 JSW ENERGY LTD
VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 60000 247900
42800
LANCO KPLLANCO KONDAPALLI POWER
LTDTHERMAL-GAS 36814 85060
25776
LANCO KPL STG -IILANCO KONDAPALLI POWER
LTDTHERMAL-GAS 36600 12979
46330
LANCO KPL STG -IIIALANCO KONDAPALLI POWER
LTDTHERMAL-GAS 37100 85710
46330
LANCO KPL STG -III BLANCO KONDAPALLI POWER
LTDTHERMAL-GAS 37100 43639
46330
HINDUJA NATIONAL PCL HINDUJA NATIONAL PCL THERMAL-COAL 104000 303000 38200
MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 121164 49940
UDUPI POWER COR LTD ADANI POWER LTD THERMAL-COAL 120000 754613 42500
SPECTRUM POWER GENERATION
LTD SPECTRUM PG LTD THERMAL-GASN 20525 9256812
34952
TAQA NEYVELI POWER COM PVT
LTD TAQA NEYVELI THERMAL-LIG 25000 5840
34500
ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 251000 51000
ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 207860 36800
GMR VEMAGIRI POWER GENERATION
LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 30117
46450
EASTERN REGION
CENTRAL SECTOR
MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 64675 53113
MTPS STAGE - II KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 39000 1432 69138
BOKARO `B` TPS DVC THERMAL-COAL 63000 145670 31539
MEJIA TPS U 1-3 DVC THERMAL-COAL 63000 348298 31552
MEJIA TPS U 4 DVC THERMAL-COAL 21000 116099 34997
MEJIA TPS U 5-6 DVC THERMAL-COAL 50000 276427 35976
MEJIA TPS U 7-8 DVC THERMAL-COAL 100000 552854 36991
DURGAPUR STEEL TPS DVC THERMAL-COAL 100000 665550 39323
DURGAPUR TPS DVC THERMAL-COAL 21000 59270 35416
RAGHUNATHPUR TPS DVC THERMAL-COAL 120000 201650 35326
MAITHON HYDEL STA DVC HYDRO-HYDRO 6320 12200 17984
CHANDRAPURA TPSU1-3 DVC THERMAL-COAL 42000 257610 35095
CHANDRAPURA TPSU7-8 DVC THERMAL-COAL 50000 306673 34987
KODERMA TPS DVC THERMAL-COAL 100000 380180 38131
PANCHET HPS DVC HYDRO-HYDRO 8000 13360 17984
TILLAYA HPS DVC HYDRO-HYDRO 400 1410 17984
RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34700 35400
TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 277300 23200
TLDP -III NHPC LTD HYDRO-HYDRO 13200 55400 62000
TLDP -IV NHPC LTD HYDRO-HYDRO 16000 60300 25600
FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 957219 33700
FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 308943 41000
BONGAINGAON TPS NTPC LTD THERMAL-COAL 25000 153663 58600
KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 542277 34200
KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 942591 34200
BARH-II NTPC LTD THERMAL-COAL 132000 728021 44500
TALCHER TPS NTPC LTD THERMAL-COAL 46000 335521 30100
TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 702319 25600
TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1436521 24700
STATE SECTOR
BTPS(RampM) BIHAR STATE PGCL THERMAL-COAL 22000 12142 39700
BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 98331 10602
HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 50593 9482
CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 19689 2605
RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 53192 6033
UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 147208 14637
Page 40
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 60353 4519
IB TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 288567 25000
J P H GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 210 038 61100
MEYONG CHU GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 400 1086 61100
TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 122667 38200
DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 214339 43321
KOLAGHAT THERMAL POWER
STATION
WEST BENGAL PDCL THERMAL-COAL 126000 538269 31603
BAKRESHWAR THERMAL POWER
PLANT
WEST BENGAL PDCL THERMAL-COAL 105000 634876 32154
BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 45000 166855 33299
SANTHALDIH THERMAL POWER
STATION
WEST BENGAL PDCL THERMAL-COAL 50000 336442 34932
SAGARDIGHI THERMAL POWER
PROJECT
WEST BENGAL PDCL THERMAL-COAL 160000 423121 34705
JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 20344 68900
RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 24559 68900
TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 4623 68900
PURULIA PUMPED STORAGE
PROJECT
WEST BENGAL SEDCL HYDRO-HYDRO 90000 108816 68900
MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2768 68900
PRIVATE SECTOR
CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 49474 20230
CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 555500 70200
HALDIA ENERGY HALDIA ENERGY LTD THERMAL-COAL 60000 371000 50400
DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3688 63400
KAMALANGA TPS GMR KAMALANGA ENERGY LTD THERMAL-COAL 105000547670
33300
ADHUNIK POWER U-1 ADHUNIK POWER THERMAL-COAL 27000 158 44060
ADHUNIK POWER U-2 ADHUNIK POWER THERMAL-COAL 27000 168 44250
VL-JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 332800 23622
JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 43000 45250
JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 71700 37030
JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 70700 35920
JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 71100 38870
JOJOBERA UNIT 5 TATA POWER COM LTD THERMAL-COAL 12000 79300 44560
JOJOBERA UNIT 6 TATA POWER COM LTD THERMAL-WHR 12000 83700 12840
IEL KALINGANAGAR U-I TATA POWER COM LTD THERMAL-WG 6750 33400 22500
IEL KALINGANAGAR U-II TATA POWER COM LTD THERMAL-WG 6750 34800 22500
MAITHON UNIT 1 amp 2 TATA POWER COM LTD THERMAL-COAL 105000 678000 36100
HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 27500 24340
HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 28400 24340
HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 15800 24310
NORTH EASTERN REGION
CENTRAL SECTOR
LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 74100 36600
AGARTALA GT NEEPCO THERMAL-GAS 13500 88611 27210
ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 153111 32310
DOYANG HEP NEEPCO HYDRO-HYDRO 7500 25598 49801
KOPILI HEP NEEPCO HYDRO-HYDRO 20000 98186 11491
KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 19582 20237
KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 10310 17968
RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 124093 22945
TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 10100 17344 39000
STATE SECTOR
HYDRO POWER (122 Stns) ITANAGAR GOVT OF ARUNACHAL
PRADESHHYDRO-HYDRO 6971 6217270
24600
KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39514 17337
LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 82327 36810
NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 33318 48290
MYNTRIANG SHEP ST II ASSAM POWER GENCO HYDRO-HYDRO 300 567 35776
LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 9130 49200
LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 012 49200
DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 022 49200
TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 000 49200
UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 4990 16000
UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 6476 37000
UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 16494 14600
UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 3600 9556 15000
SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 758 8000
MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44070 44800
KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 154 41400
TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 091 41400
MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 411 41400
MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 394 41400
KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 760 41400
SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 3264 41400
LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 044 41400
BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 18953 28000
ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 43585 28200
GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 4080 11100
Note
LIG Lignite N Naptha WHR Waste Heat Recovery
Page 41
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) SRI DAMODARAM STPS APPDCL THERMAL-COAL 160000 808108 36300
PRIVATE SECTOR
KARUPPUR TANJORE LANCO TANJORE PCL THERMAL-GAS 12000 48096 28770
SIMHAPURI ENERGY LTD SIMHAPURI ENERGY LTD THERMAL-COAL 60000 143900 39100
JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GASHSD 22885 7111 45500
SBU 1 JSW ENERGY LTD
VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 26000 159100
43300
SBU 2 JSW ENERGY LTD
VIJAYANAGARJSW ENERGY LTD THERMAL-IMP COAL 60000 247900
42800
LANCO KPLLANCO KONDAPALLI POWER
LTDTHERMAL-GAS 36814 85060
25776
LANCO KPL STG -IILANCO KONDAPALLI POWER
LTDTHERMAL-GAS 36600 12979
46330
LANCO KPL STG -IIIALANCO KONDAPALLI POWER
LTDTHERMAL-GAS 37100 85710
46330
LANCO KPL STG -III BLANCO KONDAPALLI POWER
LTDTHERMAL-GAS 37100 43639
46330
HINDUJA NATIONAL PCL HINDUJA NATIONAL PCL THERMAL-COAL 104000 303000 38200
MEENAKSHI ENERGY LTD PH-I MEENAKSHI ENERGY PVT LTD THERMAL-COAL 30000 121164 49940
UDUPI POWER COR LTD ADANI POWER LTD THERMAL-COAL 120000 754613 42500
SPECTRUM POWER GENERATION
LTD SPECTRUM PG LTD THERMAL-GASN 20525 9256812
34952
TAQA NEYVELI POWER COM PVT
LTD TAQA NEYVELI THERMAL-LIG 25000 5840
34500
ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 251000 51000
ILampFS TN P COM LTD ILampFS TN P COM LTD THERMAL-COAL 60000 207860 36800
GMR VEMAGIRI POWER GENERATION
LTD GMR VEMAGIRI PGL THERMAL-GAS 38763 30117
46450
EASTERN REGION
CENTRAL SECTOR
MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 22000 64675 53113
MTPS STAGE - II KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 39000 1432 69138
BOKARO `B` TPS DVC THERMAL-COAL 63000 145670 31539
MEJIA TPS U 1-3 DVC THERMAL-COAL 63000 348298 31552
MEJIA TPS U 4 DVC THERMAL-COAL 21000 116099 34997
MEJIA TPS U 5-6 DVC THERMAL-COAL 50000 276427 35976
MEJIA TPS U 7-8 DVC THERMAL-COAL 100000 552854 36991
DURGAPUR STEEL TPS DVC THERMAL-COAL 100000 665550 39323
DURGAPUR TPS DVC THERMAL-COAL 21000 59270 35416
RAGHUNATHPUR TPS DVC THERMAL-COAL 120000 201650 35326
MAITHON HYDEL STA DVC HYDRO-HYDRO 6320 12200 17984
CHANDRAPURA TPSU1-3 DVC THERMAL-COAL 42000 257610 35095
CHANDRAPURA TPSU7-8 DVC THERMAL-COAL 50000 306673 34987
KODERMA TPS DVC THERMAL-COAL 100000 380180 38131
PANCHET HPS DVC HYDRO-HYDRO 8000 13360 17984
TILLAYA HPS DVC HYDRO-HYDRO 400 1410 17984
RANGIT HPS NHPC LTD HYDRO-HYDRO 6000 34700 35400
TEESTA V HPS NHPC LTD HYDRO-HYDRO 51000 277300 23200
TLDP -III NHPC LTD HYDRO-HYDRO 13200 55400 62000
TLDP -IV NHPC LTD HYDRO-HYDRO 16000 60300 25600
FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 160000 957219 33700
FARAKKA STPS III NTPC LTD THERMAL-COAL 50000 308943 41000
BONGAINGAON TPS NTPC LTD THERMAL-COAL 25000 153663 58600
KAHALGAON TPS I NTPC LTD THERMAL-COAL 84000 542277 34200
KAHALGAON TPS II NTPC LTD THERMAL-COAL 150000 942591 34200
BARH-II NTPC LTD THERMAL-COAL 132000 728021 44500
TALCHER TPS NTPC LTD THERMAL-COAL 46000 335521 30100
TALCHER KANIHA I NTPC LTD THERMAL-COAL 100000 702319 25600
TALCHER KANIHA II NTPC LTD THERMAL-COAL 200000 1436521 24700
STATE SECTOR
BTPS(RampM) BIHAR STATE PGCL THERMAL-COAL 22000 12142 39700
BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 51000 98331 10602
HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 27550 50593 9482
CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 7200 19689 2605
RENGALI HPS ODISHA HPCL HYDRO-HYDRO 25000 53192 6033
UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 60000 147208 14637
Page 40
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 60353 4519
IB TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 288567 25000
J P H GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 210 038 61100
MEYONG CHU GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 400 1086 61100
TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 122667 38200
DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 214339 43321
KOLAGHAT THERMAL POWER
STATION
WEST BENGAL PDCL THERMAL-COAL 126000 538269 31603
BAKRESHWAR THERMAL POWER
PLANT
WEST BENGAL PDCL THERMAL-COAL 105000 634876 32154
BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 45000 166855 33299
SANTHALDIH THERMAL POWER
STATION
WEST BENGAL PDCL THERMAL-COAL 50000 336442 34932
SAGARDIGHI THERMAL POWER
PROJECT
WEST BENGAL PDCL THERMAL-COAL 160000 423121 34705
JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 20344 68900
RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 24559 68900
TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 4623 68900
PURULIA PUMPED STORAGE
PROJECT
WEST BENGAL SEDCL HYDRO-HYDRO 90000 108816 68900
MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2768 68900
PRIVATE SECTOR
CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 49474 20230
CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 555500 70200
HALDIA ENERGY HALDIA ENERGY LTD THERMAL-COAL 60000 371000 50400
DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3688 63400
KAMALANGA TPS GMR KAMALANGA ENERGY LTD THERMAL-COAL 105000547670
33300
ADHUNIK POWER U-1 ADHUNIK POWER THERMAL-COAL 27000 158 44060
ADHUNIK POWER U-2 ADHUNIK POWER THERMAL-COAL 27000 168 44250
VL-JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 332800 23622
JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 43000 45250
JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 71700 37030
JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 70700 35920
JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 71100 38870
JOJOBERA UNIT 5 TATA POWER COM LTD THERMAL-COAL 12000 79300 44560
JOJOBERA UNIT 6 TATA POWER COM LTD THERMAL-WHR 12000 83700 12840
IEL KALINGANAGAR U-I TATA POWER COM LTD THERMAL-WG 6750 33400 22500
IEL KALINGANAGAR U-II TATA POWER COM LTD THERMAL-WG 6750 34800 22500
MAITHON UNIT 1 amp 2 TATA POWER COM LTD THERMAL-COAL 105000 678000 36100
HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 27500 24340
HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 28400 24340
HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 15800 24310
NORTH EASTERN REGION
CENTRAL SECTOR
LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 74100 36600
AGARTALA GT NEEPCO THERMAL-GAS 13500 88611 27210
ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 153111 32310
DOYANG HEP NEEPCO HYDRO-HYDRO 7500 25598 49801
KOPILI HEP NEEPCO HYDRO-HYDRO 20000 98186 11491
KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 19582 20237
KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 10310 17968
RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 124093 22945
TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 10100 17344 39000
STATE SECTOR
HYDRO POWER (122 Stns) ITANAGAR GOVT OF ARUNACHAL
PRADESHHYDRO-HYDRO 6971 6217270
24600
KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39514 17337
LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 82327 36810
NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 33318 48290
MYNTRIANG SHEP ST II ASSAM POWER GENCO HYDRO-HYDRO 300 567 35776
LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 9130 49200
LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 012 49200
DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 022 49200
TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 000 49200
UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 4990 16000
UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 6476 37000
UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 16494 14600
UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 3600 9556 15000
SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 758 8000
MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44070 44800
KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 154 41400
TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 091 41400
MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 411 41400
MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 394 41400
KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 760 41400
SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 3264 41400
LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 044 41400
BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 18953 28000
ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 43585 28200
GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 4080 11100
Note
LIG Lignite N Naptha WHR Waste Heat Recovery
Page 41
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Installed
Capacity(MW)
Net Gen
(Mkwh)
Rate of Sale of
Power as
approved by
Gen Utilities
(Gen Tariff)
(PaiseKwh)
iii=( i+ii) UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 32000 60353 4519
IB TPS UNITS 1amp2 ODISHA PGCL THERMAL-COAL 42000 288567 25000
J P H GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 210 038 61100
MEYONG CHU GOVT OF SIKKIM EampPDEPTT HYDRO-HYDRO 400 1086 61100
TENUGHAT TPS TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 42000 122667 38200
DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 66000 214339 43321
KOLAGHAT THERMAL POWER
STATION
WEST BENGAL PDCL THERMAL-COAL 126000 538269 31603
BAKRESHWAR THERMAL POWER
PLANT
WEST BENGAL PDCL THERMAL-COAL 105000 634876 32154
BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 45000 166855 33299
SANTHALDIH THERMAL POWER
STATION
WEST BENGAL PDCL THERMAL-COAL 50000 336442 34932
SAGARDIGHI THERMAL POWER
PROJECT
WEST BENGAL PDCL THERMAL-COAL 160000 423121 34705
JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 4400 20344 68900
RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 5100 24559 68900
TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 6750 4623 68900
PURULIA PUMPED STORAGE
PROJECT
WEST BENGAL SEDCL HYDRO-HYDRO 90000 108816 68900
MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 1405 2768 68900
PRIVATE SECTOR
CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 11000 49474 20230
CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 112500 555500 70200
HALDIA ENERGY HALDIA ENERGY LTD THERMAL-COAL 60000 371000 50400
DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 1200 3688 63400
KAMALANGA TPS GMR KAMALANGA ENERGY LTD THERMAL-COAL 105000547670
33300
ADHUNIK POWER U-1 ADHUNIK POWER THERMAL-COAL 27000 158 44060
ADHUNIK POWER U-2 ADHUNIK POWER THERMAL-COAL 27000 168 44250
VL-JHARSUGUDA VEDANTA LTD THERMAL-COAL 240000 332800 23622
JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 6750 43000 45250
JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 12000 71700 37030
JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 12000 70700 35920
JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 12000 71100 38870
JOJOBERA UNIT 5 TATA POWER COM LTD THERMAL-COAL 12000 79300 44560
JOJOBERA UNIT 6 TATA POWER COM LTD THERMAL-WHR 12000 83700 12840
IEL KALINGANAGAR U-I TATA POWER COM LTD THERMAL-WG 6750 33400 22500
IEL KALINGANAGAR U-II TATA POWER COM LTD THERMAL-WG 6750 34800 22500
MAITHON UNIT 1 amp 2 TATA POWER COM LTD THERMAL-COAL 105000 678000 36100
HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 4500 27500 24340
HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 4500 28400 24340
HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 3000 15800 24310
NORTH EASTERN REGION
CENTRAL SECTOR
LOKTAK HPS NHPC LTD HYDRO-HYDRO 10500 74100 36600
AGARTALA GT NEEPCO THERMAL-GAS 13500 88611 27210
ASSAM GAS BASED POWER PLANT NEEPCO THERMAL-GAS 29100 153111 32310
DOYANG HEP NEEPCO HYDRO-HYDRO 7500 25598 49801
KOPILI HEP NEEPCO HYDRO-HYDRO 20000 98186 11491
KHANDONG HEP NEEPCO HYDRO-HYDRO 5000 19582 20237
KOPILI ST- II HEP NEEPCO HYDRO-HYDRO 2500 10310 17968
RANGANADI HEP NEEPCO HYDRO-HYDRO 40500 124093 22945
TRIPURA GAS BASED PLANT NEEPCO THERMAL-GAS 10100 17344 39000
STATE SECTOR
HYDRO POWER (122 Stns) ITANAGAR GOVT OF ARUNACHAL
PRADESHHYDRO-HYDRO 6971 6217270
24600
KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 10000 39514 17337
LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 15720 82327 36810
NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 11950 33318 48290
MYNTRIANG SHEP ST II ASSAM POWER GENCO HYDRO-HYDRO 300 567 35776
LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 2400 9130 49200
LANG HEP GOVT OF NAGALAND HYDRO-HYDRO 100 012 49200
DUILUMROI HEP GOVT OF NAGALAND HYDRO-HYDRO 054 022 49200
TEHOK HEP GOVT OF NAGALAND HYDRO-HYDRO 150 000 49200
UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 2000 4990 16000
UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 6476 37000
UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 6000 16494 14600
UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 3600 9556 15000
SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 150 758 8000
MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 12600 44070 44800
KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 105 154 41400
TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 050 091 41400
MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 200 411 41400
MAICHARM -II MIZORAM POWER ELECT HYDRO-HYDRO 300 394 41400
KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 300 760 41400
SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 1200 3264 41400
LAMSIAL MIZORAM POWER ELECT HYDRO-HYDRO 050 044 41400
BARAMURA GT TRIPURA SECL THERMAL-GAS 4200 18953 28000
ROKHIA GAS TP TRIPURA SECL THERMAL-GAS 6300 43585 28200
GUMTI HPS TRIPURA SECL HYDRO-HYDRO 1500 4080 11100
Note
LIG Lignite N Naptha WHR Waste Heat Recovery
Page 41