CTL Expansion Update
Background
Options
Next Steps
8/6/2019 Executive Committee Site Plan Expansion May 2011
2/16
Background
Site expansion at CTL:
1961 Original church construction1963 Parsonage construction
1966 School construction
1988 Sanctuary expansion
2002 Major expansion, including gym,
fellowship hall and classrooms
8/6/2019 Executive Committee Site Plan Expansion May 2011
3/16
Background
Growth at CTL
0
100200
300
400
500600
700
800
1999 2001 2003 2005 2007 2009
Members
Worship
Attendance
8/6/2019 Executive Committee Site Plan Expansion May 2011
4/16
Background
CTL School Growth
020
40
60
80
100
120
140
2000
2002
2004
2006
2008
2010
2012
Pre-K
K-8
8/6/2019 Executive Committee Site Plan Expansion May 2011
5/16
Background
Challenges
Now (Within a year) Parking capacity
Soon (3 to 5 Years) Sanctuary capacity
Office/staff space
Classroom space
Meeting space
Future (5 to 10 years) Capacity issues for
everything (Hopefully!)
8/6/2019 Executive Committee Site Plan Expansion May 2011
6/16
Options Build on new site
Buy/Trade for existing property
Expand on current site
Other options Split campus
Daughter congregation
Joint effort with another WELS congregation
Additional worship services
Short-term solutions WE Energies Parking
Shuttle lot parking
8/6/2019 Executive Committee Site Plan Expansion May 2011
7/16
Options
Need to add map of WELS churches andboundary of target areaC
TL
8/6/2019 Executive Committee Site Plan Expansion May 2011
8/16
Options
Build on new site
Some availability (Calhoun and Greenfield)
Land cost at +/-$200,00/acre, with minimumrequirement of 6 acres
Cost to build expanded facility approx. $8M
Congregation has incremental borrowing
capacity of approx. $1M Therefore, this option is only viable if existing
property could be sold for $8M
8/6/2019 Executive Committee Site Plan Expansion May 2011
9/16
Options
Trade for existing property
88 churches identified in target area
Most (78 properties) were too small and/or did not
have school facilities 6 were too large
Four potential properties none right at the moment
St. Lukes-180th & Greenfield
Elm Grove Lutheran-Terrace Drive Zion Ev. Lutheran-Lisbon and Brookfield Roads
Brookfield Christian Reformed-Burleigh & Lilly Rds.
8/6/2019 Executive Committee Site Plan Expansion May 2011
10/16
Options
Need ot add target area map with fourpotential properties noted (Use to
describe situation)
8/6/2019 Executive Committee Site Plan Expansion May 2011
11/16
Options
Expand on current site
Issues
Landlocked
Zoning/use requirements
Opportunities
Ideal location Lowest cost option
Least disruptive option
8/6/2019 Executive Committee Site Plan Expansion May 2011
12/16
Options
Location Disruption Cost
Build on
new site + - $4-5M
Trade for
existing prop. o/- - $3-5M
Expand on
current site + + $2-2.5M
8/6/2019 Executive Committee Site Plan Expansion May 2011
13/16
Next Steps
Now (within a year) Remove teacherage $40,000
Move playground 10,000
Install pavement 20,000
Contingency 30,000
$100,000
Will result in 12-15 spaces
Obtain sales commitment on two adjacent properties
8/6/2019 Executive Committee Site Plan Expansion May 2011
14/16
Next Steps
Soon (3 to 5 Years) Procure two neighboring properties
To honor privacy of neighbors, will not go deeply
into details Efforts to date indicate that it would be reasonable
to expect that two properties could be acquiredwithin 3 to 7 years. Cost, including demolition,would total approx. $650,000
Property would be used for: Parking expansion by approx. 50 spaces ($100,000)
Future building expansion
8/6/2019 Executive Committee Site Plan Expansion May 2011
15/16
Next Steps
Future (5 to 10 years)
Building expansion of approx. 7,500 sq. ft.
Increase sanctuary by 50%
Increase office/staff space
Increase meeting space
Classrooms
Other future needs
Cost of $1.0 to $1.5M
8/6/2019 Executive Committee Site Plan Expansion May 2011
16/16
Recommendation
CTL expansion efforts should focus onour existing site.
-will require some steps that will appearwasteful (tearing down houses)
-will undoubtedly encounter zoning,timing and other obstacles
-but should result in the best outcomeat the lowest cost in the long run.