Slide 1 of 37 26 June, 2000 Flaws in the Capital Allocation Process The Capex requirements The Over-promise on delivery The Way Ahead Excom Early Look Business Plan 2000

Excom Early Look Business Plan 2000 underdelivery.pdf · 2019-11-18 · Excom Early Look Business Plan 2000 . Slide 2 of 37 26 June, 2000 ... Proposed spend is ca $7 bln per year

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Excom Early Look Business Plan 2000 underdelivery.pdf · 2019-11-18 · Excom Early Look Business Plan 2000 . Slide 2 of 37 26 June, 2000 ... Proposed spend is ca $7 bln per year

Slide 1 of 37 26 June, 2000

•  Flaws in the Capital Allocation Process

•  The Capex requirements

•  The Over-promise on delivery

•  The Way Ahead

Excom Early Look Business Plan 2000

Page 2: Excom Early Look Business Plan 2000 underdelivery.pdf · 2019-11-18 · Excom Early Look Business Plan 2000 . Slide 2 of 37 26 June, 2000 ... Proposed spend is ca $7 bln per year

Slide 2 of 37 26 June, 2000

The Good News •  High quality internally consistent data

submissions •  Abundance of projects competing for

funds: – 1.9 bln US$ Exploration – 7.0 bln US$ Production

Page 3: Excom Early Look Business Plan 2000 underdelivery.pdf · 2019-11-18 · Excom Early Look Business Plan 2000 . Slide 2 of 37 26 June, 2000 ... Proposed spend is ca $7 bln per year

Slide 3 of 37 26 June, 2000

The Bad News •  Projects appear over-optimistic both in

Exploration and Production

•  The Capital Allocation Process appears to be flawed with overstatements of key parameters to secure funds We run the risk of initiating an Over-promise Under-delivery Cycle……...

Page 4: Excom Early Look Business Plan 2000 underdelivery.pdf · 2019-11-18 · Excom Early Look Business Plan 2000 . Slide 2 of 37 26 June, 2000 ... Proposed spend is ca $7 bln per year

Slide 4 of 37 26 June, 2000

Exploration-Overstated Value?

0 1000 2000 3000 4000 5000 6000 7000 8000 9000

10000 11000 12000

0 250 500 750 1000 1250 1500 1750 2000 Cum Expex ($ mln)

Cum

ulat

ive

IBV

($ m

ln)

0.00 0.05 0.10 0.15 0.20 0.25 0.30 0.35

0-10 10-20 20-30 30-40 40-50 50-60 60-70 70-80 80-90

1999 CA 2000 CA Pos to FID shows

no major differences in 99 submission to 2000

Pos to FID

Expe

x Sp

end

(N

orm

alis

ed)

Salkhalin pre-consolidation 2000 Raw Data Submission

Each Exploration $ spend in 2001 adds $9 IBV at PSV14

1999 Raw Data Submission Each Exploration $ spend in 2000 adds $6 IBV at PSV14

Page 5: Excom Early Look Business Plan 2000 underdelivery.pdf · 2019-11-18 · Excom Early Look Business Plan 2000 . Slide 2 of 37 26 June, 2000 ... Proposed spend is ca $7 bln per year

Slide 5 of 37 26 June, 2000

0

100

200

300

400

500

600

2001 2002 2003 2004 2005 2006 2007

Oil

Nigeria

MRH

Gas Deepwater

Time to FID and first production in data submissions very optimistic

and unrelated to historic performance

The majority of 2001 exploration spend is for projects planned

to take FID in 2002

Exploration: Overstated Delivery? Ex

pex

2001

($ m

ln)

Page 6: Excom Early Look Business Plan 2000 underdelivery.pdf · 2019-11-18 · Excom Early Look Business Plan 2000 . Slide 2 of 37 26 June, 2000 ... Proposed spend is ca $7 bln per year

Slide 6 of 37 26 June, 2000

US$

mln

MO

D

CAPEX REQUEST 2001-2005 Raw Data Submission

EP-Global Capex per CA Cat, Theme.ep 0

1,000

2,000

3,000

4,000

5,000

6,000

7,000

8,000

2001 2002 2003 2004 2005

Commercial Resource Proposed A & D Activity New E & A Firm E & A EB2 New Dev. > $20 mln Shell Share Tranche 3 Tranche 2 Tranche 1 PostFID Project Corporate Existing Asset

Proposed spend is ca $7 bln per year over the Plan Period*

*including follow-on E&A Woodside, and Shell Canada, excludes Saudi gas

Total Capex request 2001 = $7.1 bln Total Commitments 2001 = $2.7 bln

Commitment levels suspect

Page 7: Excom Early Look Business Plan 2000 underdelivery.pdf · 2019-11-18 · Excom Early Look Business Plan 2000 . Slide 2 of 37 26 June, 2000 ... Proposed spend is ca $7 bln per year

Slide 7 of 37 26 June, 2000

Production Forecast per Region and CA Cat - Raw data.rep

0

500

1000

1500

2000

2500

3000

3500

1996 1997 1998 1999 2000 2001 2002 2003 2004 2005

Production: Can we deliver on this promise?

Nigeria (SPDC) Nigeria (SNEPCO) Others

2266 LE

2291 2351 2327 2319

Nigeria is major part of EP Growth Inside existing portfolio …..

Others are USA, Angola, Iran, Athabasca, Brasil, etc

Dai

ly P

rodu

ctio

n (K

boe/

d)

Page 8: Excom Early Look Business Plan 2000 underdelivery.pdf · 2019-11-18 · Excom Early Look Business Plan 2000 . Slide 2 of 37 26 June, 2000 ... Proposed spend is ca $7 bln per year

Slide 8 of 37 26 June, 2000

Production Forecast per Region and CA Cat - Raw data.rep

0

500

1000

1500

2000

2500

3000

3500

2000 2001 2002 2003 2004 2005

Commercial Resource Proposed A & D Activity New E & A (Non Approved expex) Firm E & A (Approved expex Funds) EB-2 New Dev. > $20 mln Shell Share Tranche 3 Tranche 2 Tranche 1 PostFID Project Corporate Existing Asset

OIL PRODUCTION 2001-2005 Raw Data Submission

Prod

uctio

n ‘0

00 b

bl/d

Oil Production from Existing Assets halves during Plan Period (10 % per year)

Post FID and tranches replaces decline in Existing Asset base

Growth relies on E&A

Page 9: Excom Early Look Business Plan 2000 underdelivery.pdf · 2019-11-18 · Excom Early Look Business Plan 2000 . Slide 2 of 37 26 June, 2000 ... Proposed spend is ca $7 bln per year

Slide 9 of 37 26 June, 2000

Major Concerns

•  Existing Assets require 800 Million US$ in 2001 without adding production...

•  Most large post-FID projects indicate underdelivery compared with 1999

•  New projects have very aggressive FID dates (36 FIDs in 2001 excluding big tickets e.g. Saudi Gas) and possibly overstated value promises

•  E&A Follow Up extremely optimistic when compared with history

•  Not enough funds for promising projects and strategic options

Page 10: Excom Early Look Business Plan 2000 underdelivery.pdf · 2019-11-18 · Excom Early Look Business Plan 2000 . Slide 2 of 37 26 June, 2000 ... Proposed spend is ca $7 bln per year

Slide 10 of 37 26 June, 2000

CAPEX CREAMING CURVE

0

5,000

10,000

15,000

20,000

25,000

30,000

35,000

40,000

45,000

50,000

0 1000 2000 3000 4000 5000 6000 7000

Existing Asset Post FID Project Options

NPV

($m

ln)

Cumulative Capex in 2001 ($mln)

The promise The delivery

AOSP EA NLNG

Bonga Main Malampaya

Historical performance raises questions over ambitious future promises

But…some big projects approved were poorer ranking

Page 11: Excom Early Look Business Plan 2000 underdelivery.pdf · 2019-11-18 · Excom Early Look Business Plan 2000 . Slide 2 of 37 26 June, 2000 ... Proposed spend is ca $7 bln per year

Slide 11 of 37 26 June, 2000

Exploration Discoveries 1990-1999 Development Percentage @1.1.2000

0%

20%

40%

60%

80%

100%

1990 1991 1992 1993 1994 1995 1996 1997 1998 1999 2000 2001

90-94 25% Developed

95-99 7% Developed

10 years ONLY 15% Developed

34%

5 year Plan Period

Promise

Plan Excl. Sakhalin & OKIOC

>> 34% Development percentage Exploration discoveries within 5 years has not been achieved to date ….

Bonga discovered ‘95, onstream 2003 Brazil, not a well drilled yet, production by 2005

Sable Island

Page 12: Excom Early Look Business Plan 2000 underdelivery.pdf · 2019-11-18 · Excom Early Look Business Plan 2000 . Slide 2 of 37 26 June, 2000 ... Proposed spend is ca $7 bln per year

Slide 12 of 37 26 June, 2000

Shell Malaysia (total) KN ROUND 2 01-2000 1999 Shell Malaysia (total) KN S1S2 01-2000 1999 Shell Iran Soroosh /Nowrooz 01-2000 11-1999 Shell USA Oregano 05-2000 04-2000 Shell USA Serrano 05-2000 04-2000

Norske Shell Garn West 03-2000 04-2000 Shell USA North Marlin 04-2000 07-2000 Shell UK Expro Mandarin 10-2000 09-2000

Turkmenistan, Uzbekistan, Uzbekistan Alan & Kandym 07-2000 01-2001

Brunei Shell Champion West Existing Facilities 12-2000 01-2001 SOGU Dan Infill and Debottlenecking 03-2000 03-2001 Shell Egypt N.V. Obaiyed South Devt 11-2000 07-2001 Shell UK Expro Goldeneye 10-2000 12-2001 Shell Australia NWS LNG Expansion U/S 03-2000 01-2004 Shell Australia ALNG LNG Train 1 U/S 09-2000 01-2004 Brunei Shell Egret Development 10-2000 01-2004

Shell Capsa Cerro Tuyunti Sth. 11-2000 ?

Shell USA Na Kika 05-2000

Shell UK Expro Cleaver Bank High 10-2000 10-2001

A/S Norske Shell Sogn Gjoa Development 09-2000 ? Shell Devt. Pakistan B.V. Kirthar Block : Bhit dev 03-2000 ?

Country Projects with FIDs in 2000

MAJOR PROJECT FIDs 2000 from BP’99 BP ‘99 Timing

CA 2000 Timing

07-2000

SPDC Cawthorne Channel 09-2000 10-2000 SPDC Bonny Terminal Refurbishment 07-2000 07-2000

Slipped

On-time

Page 13: Excom Early Look Business Plan 2000 underdelivery.pdf · 2019-11-18 · Excom Early Look Business Plan 2000 . Slide 2 of 37 26 June, 2000 ... Proposed spend is ca $7 bln per year

Slide 13 of 37 26 June, 2000

MAJOR PROJECT FIDs 2000 from BP’99

No

of M

ajor

FID

s in

Pla

n

• 12 major Base Plan projects planned for FID in 2000 (BP 99) - 5 will now take FID •  13 major Options projects planned for FID in 2000 (BP 99) - 6 will now take FID

0

5

10

15

20

1999 99 Actual 2000 00 LE 2001

Bangestan Kuwait Oil 25

30 Champion Dan Infill T2T upstream Cleaver Bank Egret Bangestan Obayied South Goldeneye

25

30 Options Deferred Base Deferred Options Plan/Actual

Base Plan/Actual

36

Page 14: Excom Early Look Business Plan 2000 underdelivery.pdf · 2019-11-18 · Excom Early Look Business Plan 2000 . Slide 2 of 37 26 June, 2000 ... Proposed spend is ca $7 bln per year

Slide 14 of 37 26 June, 2000

Country Project VAR coverage in 2001 on Total Capex

MAJOR PROJECTS WITH PROMISES OF FID IN 2001….

36 Projects with >20 mln spend excluding Major Options e.g. Bangestan, Saudi Gas

Total Capex from 2001 FID projects amounts to $4 bln in plan period

Australia (Direct) Gorgon SMDS Upstream 0 Brunei Champion West Central Platform Dev 1 Brunei East Gas Expansion 4 Brunei Egret Development. Phase 1 3

Denmark Halfdan Phase III 102 Denmark Halfdan Phase II 41 Denmark GSA4 13 Denmark Dan Infill and Debottlenecking 8 Denmark Skjold Phase II 32 Egypt Obaiyed South & Compression I 26

Malaysia 96 PSC : BT/SF Stage IVC(SF30) WI Int. 1 New Zealand Pohokura Development 3 Nigeria (SNEPCO) Erha Main 48 Nigeria (SNEPCO) EWTF (Extended Well Test Facility) 118 Nigeria (SPDC) 92 Offshore Pipeline AF - NLNG 1-5 87 Nigeria (SPDC) 49 UGHELLI 24 Nigeria (SPDC) 66 OTUMARA - NLNG 4/5 16 Nigeria (SPDC) 67 SAPELE 1 Nigeria (SPDC) 45 OGUTA 3 Nigeria (SPDC) 61 BONNY - NLNG 3 1 Nigeria (SPDC) 98 WAGP 22

FID (5 %)

Concept (3 %)

Feasibility (42 %)

Initiation (<1 %)

No VAR (50 %)

2001 Capex

2001-2005 Capex (Risked)

46 75 38 40

475 65 75 42

32 85

31 26

902 128 184 122 117 90 77 29

22

Page 15: Excom Early Look Business Plan 2000 underdelivery.pdf · 2019-11-18 · Excom Early Look Business Plan 2000 . Slide 2 of 37 26 June, 2000 ... Proposed spend is ca $7 bln per year

Slide 15 of 37 26 June, 2000

Norway Kollsnes and Vestprosess Upgrade 0 Philippines Malampaya Oil Rim Devt - unrisked 6 Russia (Rest of) Salym 29 Syria Souedie 0 UK Goldeneye 7 UK Loyal Phase II (W.o.S) 31 UK Puffin Field Development 9 UK Schiehallion Extension Claw 9 UK Scoter 0 UK Schiehallion North Channel 0 USA Holstein 26 USA Habanero 0 USA Manatee 14 USA Alex Gas Devt Phase 2 22 Venezuela 02 - 05 Further Dev. (1) 0

MAJOR PROJECTS WITH FID IN 2001 - continued

FID (5 %)

Concept (3 %)

Feasibility (42 %)

Initiation (<1 %)

No VAR (50 %)

Country Project VAR coverage in 2001 on Total Capex

Total Capex from 2001 FID projects circa $4 bln in plan period

2001 Capex

2001-2005 Capex (Risked)

53 83

129 26

151 65 62 57 55 21 327 39 33 22 64

36 Projects with >20 mln spend excluding Major Options e.g. Bangestan, Saudi Gas

Page 16: Excom Early Look Business Plan 2000 underdelivery.pdf · 2019-11-18 · Excom Early Look Business Plan 2000 . Slide 2 of 37 26 June, 2000 ... Proposed spend is ca $7 bln per year

Slide 16 of 37 26 June, 2000

Existing Assets / Post FID Ranking (2001 Capex > $20 million) $1

4/bb

l Attr

activ

enes

s

Strategic Imperative Low Medium High

High

Medium

Low

1 2 4

3 7

6 8 9

5

$14/bbl

45%

65%

MRH Nigeria Deepwater Gas Oil

Australia - NWS Existing US Canada Existing Assets Malaysia - MLNG PSC New (F23/F6/E11 Comp.)

Netherlands -NAM Plan - Scenario 1

Abu Dhabi - Existing Oil Business Denmark - Halfdan Phase I Oman - 1a PB01M NFA TRAN1 2000 W

Syria - AFPC Existing Facilities

UK - Existing assets

Oman - GISCO Philippines - Malampaya Gas Devt

SPDC - 42 FORCADOS YOKRI - NLNG 3 SPDC - 48 SOKU - NLNG 1-2

USA - Brutus

USA - Crosby

Argentina - VALLE MORADO Egypt - POST FID Obaiyed Malaysia - MLNG Dua PSC New (M4. B11. etc) Iran - Soroosh/Nowrooz Integ. SPDC - 90 EA Equity and Carry - NLNG 3 SPDC - 91 Offshore Pipeline - NLNG 1-5 Canada - Athabasca Oil Sands Project Brunei - Ampa Fairley Rationalisation Phase 1

USA - Ursa UK - ExAss Brent Gas Contract SNEPCO - Bonga-Main SPDC - 02 Value Preservation SPDC - 03 Bonny Terminal Norway - Troll Oil Russia - Caspian Pipeline Consortium Sakhalin - Molikpaq UK - ExAss Skua USA - Aera Equity

Page 17: Excom Early Look Business Plan 2000 underdelivery.pdf · 2019-11-18 · Excom Early Look Business Plan 2000 . Slide 2 of 37 26 June, 2000 ... Proposed spend is ca $7 bln per year

Slide 17 of 37 26 June, 2000

$14/

bbl A

ttrac

tiven

ess

Strategic Imperative Low Medium High

High

Medium

Low

1 2 4

3 7

6 8 9

5

$14/bbl

45%

65%

MRH Nigeria Deepwater Gas Oil

Base

Options

Egypt - Obaiyed South & comp. I Netherlands - NAM Plan - Scenario 3

Netherlands - NAM Scenario 2 - 1st Increml tranche UK - Tranche1 FID01 USA - Tranche 1. DW. non-EB2. FID 2001 SPDC - 49 UGHELLI Oman - 2aPB01M DEV TRAN1 2000 W

Syria - AFPC Tranche 1a (FID 2000) Thailand - Tranche 1 S1 2000 UK -Tranche1 FID00 committed

USA - Oregano

USA - Holstein SNEPCO - Ext. WTF Russia - Salym UK - Tranche1 FID01 FOP UK - Schieh infill 1 UK - Loyal Phase II

USA - Nakika

UK - Tranche3 FID01 FOP UK - Foin Infill1 UK - Foinaven East

SNEPCO - Erha Main UK - Tranche 3 FID01 FOP

EMPT

Y

$ 5.5 BLN CAPEX CEILING FOR EXISTING OUs Tranches 1-3 & New Projects (FID Q3+ 2000 & 2001 Capex > $20 mln)

Page 18: Excom Early Look Business Plan 2000 underdelivery.pdf · 2019-11-18 · Excom Early Look Business Plan 2000 . Slide 2 of 37 26 June, 2000 ... Proposed spend is ca $7 bln per year

Slide 18 of 37 26 June, 2000

Tranches 1-3 & New Projects (FID Q3+ 2000 & 2001 Capex > $20 mln)

$14/

bbl A

ttrac

tiven

ess

Strategic Imperative

Low Medium High

High

Med

ium

Low

1 2

4

3 7

6 8 9

5

$14/bbl

45%

65%

MRH Nigeria Deepwater Gas Oil

Base

Options

Syria - AFPC Tranche 1a (FID 2000)

Thailand - Tranche 1 S1 2000

UK -Tranche 1 FID00 committed

USA - Oregano

USA - Holstein SNEPCO - Ext WTF Russia - Salym

UK - Tranche1 FID01 FOP

UK - Schieh infill 1

UK - Loyal Phase II

USA - Nakika

UK - Tranche3 FID01 FOP UK - Foin Infill1 UK - Foinaven East SNEPCO - Erha Main

UK - Tranche 3 FID01 FOP

Total Capex (2001) in Box 1 is $470 mln Total Capex (2001) Box 2 is $200 mln

Total Capex (2001) in Box 3 is $910 mill

EMPT

Y

Projects inserted to Base Plan

$ 5.5 BLN CAPEX CEILING……DENMARK & BIG PROJECTS IN

Page 19: Excom Early Look Business Plan 2000 underdelivery.pdf · 2019-11-18 · Excom Early Look Business Plan 2000 . Slide 2 of 37 26 June, 2000 ... Proposed spend is ca $7 bln per year

Slide 19 of 37 26 June, 2000

CAPEX CREAMING CURVE NPV Bln $

Cumulative Capex in 2001

AOSP EA NLNG

Malampaya Deepwater Options Na Kika Holstein Serrano Oregano

Existing Assets Post FID New Devt &

Tranches Big Tickets

Bonga Main

Ehra

A

ngol

a 18

Dev

B

ange

stan

Sa

khal

in

Zapo

lyar

noye

Sout

h Pa

rs

B

razi

l

Chi

na

Woo

dsid

e D

eal

Saud

i Gas

Li

bya

N

EMED

FID in next 30 months

Success Case $ 3-4 Bln/yr

Page 20: Excom Early Look Business Plan 2000 underdelivery.pdf · 2019-11-18 · Excom Early Look Business Plan 2000 . Slide 2 of 37 26 June, 2000 ... Proposed spend is ca $7 bln per year

Slide 20 of 37 26 June, 2000

The Way Forward..(1) •  We accept the flaws in the process, challenge the submissions at the

workshop, build the 2000 Plan and make a “promise adjustment” at Excom level:

–  existing assets minus 200 Million US$ –  post-FID minus 400 Million US$ –  weed out “false promises” to the tune of 400 Million US$ –  adjust production promise

Manage Improvement through the scorecards

We must address the integrity flaws in the CA process and send a very strong signal...

Page 21: Excom Early Look Business Plan 2000 underdelivery.pdf · 2019-11-18 · Excom Early Look Business Plan 2000 . Slide 2 of 37 26 June, 2000 ... Proposed spend is ca $7 bln per year

Slide 21 of 37 26 June, 2000

•  We demand a resubmission….we change the workshop:

–  We explain our problems to the delegates at workshop. –  We ask the delegates to return to their OU/NVOs and rework their

submissions and restore reality –  Key OU/NVOs will be invited for a hard challenge session with the

Excom (large OUs) or their RBD.

•  After resubmission of sanitised data, a final ranking will be done with the RBA/RFA community.

The Way Forward..(2)

Page 22: Excom Early Look Business Plan 2000 underdelivery.pdf · 2019-11-18 · Excom Early Look Business Plan 2000 . Slide 2 of 37 26 June, 2000 ... Proposed spend is ca $7 bln per year

Slide 22 of 37 26 June, 2000

Two Possible Schedules

Workshop

Workshop

OU Financials

Allocation

Final OU Plan

OU Financials

Excom Adjustment

Improve

Resub- mission

Final OU Plan

27-28/6 10/7 6/9 14/9

Improve

10/7 17/7 28/7 6/9

Improve/challenge EPB-RBD

Page 23: Excom Early Look Business Plan 2000 underdelivery.pdf · 2019-11-18 · Excom Early Look Business Plan 2000 . Slide 2 of 37 26 June, 2000 ... Proposed spend is ca $7 bln per year

Slide 23 of 37 26 June, 2000

BACKUPS ….DETAILS

Page 24: Excom Early Look Business Plan 2000 underdelivery.pdf · 2019-11-18 · Excom Early Look Business Plan 2000 . Slide 2 of 37 26 June, 2000 ... Proposed spend is ca $7 bln per year

Slide 24 of 37 26 June, 2000

KEY METRICS - RAW DATA

Deepwater excludes SNEPCO Ranked out production in 2001 63,000 bbls/d Does not reflect OUs outside EP control - (SOGU)

Value continues to be dominated by traditional OUs Nigeria dominance of production growth not reflected in value

Page 25: Excom Early Look Business Plan 2000 underdelivery.pdf · 2019-11-18 · Excom Early Look Business Plan 2000 . Slide 2 of 37 26 June, 2000 ... Proposed spend is ca $7 bln per year

Slide 25 of 37 26 June, 2000

Short Term Oil Projects are predominantly in Shell Expro…..

UTCs $3.5 - 5.5/bbl VIRs [$14] 0.4 - 0.8 low / medium strategic fit. …….

SHORT TERM OPPORTUNITIES ….RANKED OUT

Page 26: Excom Early Look Business Plan 2000 underdelivery.pdf · 2019-11-18 · Excom Early Look Business Plan 2000 . Slide 2 of 37 26 June, 2000 ... Proposed spend is ca $7 bln per year

Slide 26 of 37 26 June, 2000

CAPEX CREAMING CURVE - THE BUILDING BLOCKS

25000

27000

29000

31000

33000

35000

37000

39000

41000

4000 4500 5000 5500 6000 6500 7000

Tranche 1 Tranche 2 Tranche 3 New Dev. > $20 mln Shell Share EB2

Tranche 3 Tranche

1

NPV $14

Cumulative Capex in 2001

DE-GSA4

EG-Obaiyed South

NI-Ughelli

BR-Champion West

UK-Goldeneye Malampaya Oil rim

NI-LNG 4/5 DE-Halfdan II TCGP Salym

Sunrise Puffin Bangestan NI-LNG 1-5

Holstein Na Kika

Ehra NI-Oguta BR-East gas exp DE-Dan infill

The promise

On merit NaKika, Holstein & Ehra do not rank

Tranche 2

Page 27: Excom Early Look Business Plan 2000 underdelivery.pdf · 2019-11-18 · Excom Early Look Business Plan 2000 . Slide 2 of 37 26 June, 2000 ... Proposed spend is ca $7 bln per year

Slide 27 of 37 26 June, 2000

“EXISTING ASSET” CATEGORY CAPEX 2001

EP-Global Capex on Existing Assets.rep

0

20

40

60

80

100

120

140

160 U

SA

Nig

eria

(SPD

C)

UK

Om

an

Abu

Dha

bi

Net

herla

nds

Bru

nei

Aus

tral

ia (D

irect

)

Syria

Mal

aysi

a

Nor

way

Egyp

t

Ger

man

y

Den

mar

k

Gab

on

New

Zea

land

US$

mln

MO

D

Country Name Capex 2001 Abu Dhabi 52 Australia (Direct) 27 Brunei 34 Denmark 7 Egypt 15 Gabon 7 Germany 13 Malaysia 17 Netherlands 47 New Zealand 2 Nigeria (SPDC) 152 Norway 15 Oman 81 Syria 23 UK 144 USA 160 Total 794

ie 800 mln - 18% of Devt Capex Budget…… •  Same level as 2000 •  no additional production generated •  keeping brownfield plant operating & ready for new devts •  Value adding or value erosion (vs 502Fs)

Page 28: Excom Early Look Business Plan 2000 underdelivery.pdf · 2019-11-18 · Excom Early Look Business Plan 2000 . Slide 2 of 37 26 June, 2000 ... Proposed spend is ca $7 bln per year

Slide 28 of 37 26 June, 2000

OIL & GAS PRODUCTION 2001-2005 BY OU Raw Data Submission

Production dominated by the big three in plan period

Without Nigeria growth,… - still only 2 OUs ~ 300+ Kboe/d S/S - 5 OUs ~ 200 - 300 kboe/d by 2005 - 3 OUs ~100 - 200 kboe/d by 2005 - 10 OUs~ <100 kboe/d OUs by 2005

Nigeria Largest producer by 2005 with threefold growth!

Page 29: Excom Early Look Business Plan 2000 underdelivery.pdf · 2019-11-18 · Excom Early Look Business Plan 2000 . Slide 2 of 37 26 June, 2000 ... Proposed spend is ca $7 bln per year

Slide 29 of 37 26 June, 2000

Raw data quality is good, ……….but there is a large request will be a tough competition for funds ……….Large number of attractive new devts & tranche funds

Large amount of funds for existing assets & Post FIDs ca $4 Bln To maintain oil production requires ca $5 Bln, with 100 % delivery

Before we consider more capex funds…..there are some issues….

But new devt “promises” are different from Vol- 1 findings ……….Most post FID projects have been under delivering production ……….Most projects have aggressive schedules vs Vol-1 reality ……….VAR programme will have to be accelerated to meet FID planned ……….Last years E&A followup developments have largely not materialised

How do we avoid an “over promise & under delivery” cycle…?

A few Outcomes from the Raw Data…..….

Page 30: Excom Early Look Business Plan 2000 underdelivery.pdf · 2019-11-18 · Excom Early Look Business Plan 2000 . Slide 2 of 37 26 June, 2000 ... Proposed spend is ca $7 bln per year

Slide 30 of 37 26 June, 2000

KEY ISSUES

CURRENT PERFORMANCE • Production under-performance

•  1999: UK, Egypt, SPDC, Syria, Netherlands •  2000 LE: Oil : Essentially on target but SPDC,

Gas : Egypt, Argentina, Netherlands, US

•  Major New Project Delivery •  1999 on-stream disappointments due mainly to project schedule delays •  2000 onwards (CA 2000) suggests production under-delivery (sub-surface & facilities) •  Reserves Replacement •  2000 LE 24 % with major concerns throughout Plan Period

FUTURE PROMISES •  Continued reliance upon Nigeria (and our ability to grow oil production there) •  Need to avoid over promising and under delivering cycle. •  Continued pursuit of major Capex spend outside of existing portfolio ..are regretting oil?

Page 31: Excom Early Look Business Plan 2000 underdelivery.pdf · 2019-11-18 · Excom Early Look Business Plan 2000 . Slide 2 of 37 26 June, 2000 ... Proposed spend is ca $7 bln per year

Slide 31 of 37 26 June, 2000

CAPEX SPEND 2001 BY COUNTRY - Raw Data Submission U

S$ m

ln M

OD

Total Capex request 2001 = $7.1 bln Total Commitments = $ 2.7 bln

Top 5 countries requested 60% of total Capex

Next 10 countries requested 30% of total Capex

The tail = 10 %

Page 32: Excom Early Look Business Plan 2000 underdelivery.pdf · 2019-11-18 · Excom Early Look Business Plan 2000 . Slide 2 of 37 26 June, 2000 ... Proposed spend is ca $7 bln per year

Slide 32 of 37 26 June, 2000

RESERVES REPLACEMENT - RAW DATA

You need to believe that the “hopes” in Angola and Brazil and new gas come off to replace reserves...

Woodside Effect

Page 33: Excom Early Look Business Plan 2000 underdelivery.pdf · 2019-11-18 · Excom Early Look Business Plan 2000 . Slide 2 of 37 26 June, 2000 ... Proposed spend is ca $7 bln per year

Slide 33 of 37 26 June, 2000

SFR MATURATION RATES - RAW DATA

Page 34: Excom Early Look Business Plan 2000 underdelivery.pdf · 2019-11-18 · Excom Early Look Business Plan 2000 . Slide 2 of 37 26 June, 2000 ... Proposed spend is ca $7 bln per year

Slide 34 of 37 26 June, 2000

Sabl

e

Isla

nd

Page 35: Excom Early Look Business Plan 2000 underdelivery.pdf · 2019-11-18 · Excom Early Look Business Plan 2000 . Slide 2 of 37 26 June, 2000 ... Proposed spend is ca $7 bln per year

Slide 35 of 37 26 June, 2000

IBV raw data submission versus 1999

0 10000

20000 30000 40000 50000 60000 70000 80000

2000 2001 2002 2003 2004 2005

IBVc

Mln

US

$ 2000 Plan 1999 Plan

- 5% - 1 % 1%

15% 21% 23%

1999 1998

The promise The delivery

1999 & 2000 value creation is limited…….. •  data assumes all planned 2000 FIDs are achieved ….unlikely based on LE •  highly optimistic forward looking 2001 to 2005 (Nigeria assumed growth not likely…) •  eg 2001 assumes we take roughly one big project FID per month (ranked in)….

Page 36: Excom Early Look Business Plan 2000 underdelivery.pdf · 2019-11-18 · Excom Early Look Business Plan 2000 . Slide 2 of 37 26 June, 2000 ... Proposed spend is ca $7 bln per year

Slide 36 of 37 26 June, 2000

EP-Global Committed Capex in 2001 by CA-Category.rep

3290

1057

1911

776 1095

459 682

322 93

0

500

1000

1500

2000

2500

3000

3500

EPN EPG EPM EPA EP

Total Capex MOD Committed Capex (MOD)

US$

mln

MO

D

CAPEX REQUEST 2001 BY REGION Raw data Submission

Total Capex request 2001 = $7.1 bln Total Commitments = $2.7 bln

Page 37: Excom Early Look Business Plan 2000 underdelivery.pdf · 2019-11-18 · Excom Early Look Business Plan 2000 . Slide 2 of 37 26 June, 2000 ... Proposed spend is ca $7 bln per year

Slide 37 of 37 26 June, 2000

EP-Global Committed Capex in 2001 by CA-Category.rep

US$

mln

MO

D

CAPEX REQUEST 2001 BY THEME Raw data Submission

Total Capex request 2001 = $7 bln Total Commitments = $2.6 bln

Excluding: Woodside, Shell Canada

SNEPCO in Nigeria

Theme ($500 mln)

1552

Page 38: Excom Early Look Business Plan 2000 underdelivery.pdf · 2019-11-18 · Excom Early Look Business Plan 2000 . Slide 2 of 37 26 June, 2000 ... Proposed spend is ca $7 bln per year

Slide 38 of 37 26 June, 2000

Production per Region - Raw data.rep 2001 2002 2003 2004 2005 0

500

1000

1500

2000

'000

boe

/d

'000

bbl

s/d

0 500

1000 1500 2000 2500 3000 3500

2000 2001 2002 2003 2004 2005

EPG EPM EPA EPN

EPG EPM EPA

EPN

OIL & GAS PRODUCTION 2001-2005 BY REGION Raw Data Submission

0 20 40 60 80 100 120

Mrd

Sm

3/yr

1999 1998 1997 1996

1999 1996 1997 1998

GAS Gas grows 50 % - across the board

2000

OIL/NGL Liquids grow 50% - predominantly in Nigeria & Brazil

Page 39: Excom Early Look Business Plan 2000 underdelivery.pdf · 2019-11-18 · Excom Early Look Business Plan 2000 . Slide 2 of 37 26 June, 2000 ... Proposed spend is ca $7 bln per year

Slide 39 of 37 26 June, 2000

Production per Region - Raw data.rep

0

500

1000

1500

2000

2000 2001 2002 2003 2004 2005

Nigeria MRH Deepwater Gas Oil

GAS

'000 boe/d

'000 bbls/d

0 500

1000 1500 2000 2500 3000 3500

2000 2001 2002 2003 2004 2005

Nigeria MRH Deepwater Gas Oil

OIL/NGL

OIL & GAS PRODUCTION 2001-2005 BY THEME Raw Data Submission Nigeria accounts for

most of the growth in liquids

Bonga

Page 40: Excom Early Look Business Plan 2000 underdelivery.pdf · 2019-11-18 · Excom Early Look Business Plan 2000 . Slide 2 of 37 26 June, 2000 ... Proposed spend is ca $7 bln per year

Slide 40 of 37 26 June, 2000

KEY METRICS - RAW DATA

MRH now includes Venezuela hence no value at $14 Deepwater excludes SNEPCO Ranked out production in 2001 43,000 bbls/d Does not reflect OUs outside EP control - (SOGU)

Value continues to be dominated by traditional OUs………... Nigeria dominance of production growth not reflected in value

Incorrect…!

Needs to be updated yet…..

Page 41: Excom Early Look Business Plan 2000 underdelivery.pdf · 2019-11-18 · Excom Early Look Business Plan 2000 . Slide 2 of 37 26 June, 2000 ... Proposed spend is ca $7 bln per year

Slide 41 of 37 26 June, 2000

SUMMARY

•  Growth in production is a major challenge •  Existing oil assets decline 50% by 2005 1,700- 800 kb/d •  New project schedules & project forecasts need realism •  Growth story dominated by Nigeria •  Still Big 3 and small 15

•  Reserves replacement is a key issue •  Brazil, Angola, CIS - new hope and OKIOC

Given the bullishness of submissions…. Need to calibrate to ensure BP’2000 does not under deliver.

Page 42: Excom Early Look Business Plan 2000 underdelivery.pdf · 2019-11-18 · Excom Early Look Business Plan 2000 . Slide 2 of 37 26 June, 2000 ... Proposed spend is ca $7 bln per year

Slide 42 of 37 26 June, 2000

Backups

Page 43: Excom Early Look Business Plan 2000 underdelivery.pdf · 2019-11-18 · Excom Early Look Business Plan 2000 . Slide 2 of 37 26 June, 2000 ... Proposed spend is ca $7 bln per year

Slide 43 of 37 26 June, 2000

EP / GP Linked Projects (FID < 3 years) Capex

Ranking

2001 Option Capex ($ mill)

Malaysia MLNG Tiga Base 24 3 GP Australia NWS LNG Train 4 Option 4 6 GP

ALNG Train 1 Option - 5 GP China Ordos / Changbei Option - Expex (in) EP

Russia Piltun-Lunskoye Option - Expex (in) EP Egypt NEMed SMDS Option - Expex (in) EP Iran Iran SMDS Option 2 6

Both Turkmenistan T2T Pipeline to Turkey Option 18 3 EP Saudi Arabia Saudi Maturation Project Option - - EP

Nigeria NLNG 3 Base 501 misc EP NLNG 4 Option 45 misc EP West Africa Gas Pipeline Base 6 3 EP Abuja Gas Pipeline Base 2 3 EP

Venezuela VLNG Option 7 6 GP Namibia Kudu Base - - EP

TOTAL (Base) 533 TOTAL (Options) 76

45%

65%

Capex Matrix Pos.

EP/GP Lead

Current Capex Ranking Cut-Off is Box 3 @ 50%

Page 44: Excom Early Look Business Plan 2000 underdelivery.pdf · 2019-11-18 · Excom Early Look Business Plan 2000 . Slide 2 of 37 26 June, 2000 ... Proposed spend is ca $7 bln per year

Slide 44 of 37 26 June, 2000

EP/GP Integrated Economics

Page 45: Excom Early Look Business Plan 2000 underdelivery.pdf · 2019-11-18 · Excom Early Look Business Plan 2000 . Slide 2 of 37 26 June, 2000 ... Proposed spend is ca $7 bln per year

Slide 45 of 37 26 June, 2000

KEY ISSUES - EP / GP Linked Projects

Malaysia MLNG Tiga Australia NWS LNG Train 4

ALNG Train 1 ALNG Train 2 NAGV Domgas & FLNG Gorgon SMDS

China Ordos / Changbei Kuqa

Russia Sakhalin (Piltun-Lunskoye) Egypt NEMED SMDS Iran Iran SMDS Turkmenistan T2T Pipeline to Turkey Saudi Arabia Saudi Gas Project

Nigeria NLNG 3 NLNG 4 West Africa Gas Pipeline

Venezuela VLNG Namibia Kudu

Country Project Name Upstream Capex

7 ….

….

…. …. ….

….

….

…. ….

….

…. ….

…. …. …. …. ….

Page 46: Excom Early Look Business Plan 2000 underdelivery.pdf · 2019-11-18 · Excom Early Look Business Plan 2000 . Slide 2 of 37 26 June, 2000 ... Proposed spend is ca $7 bln per year

Slide 46 of 37 26 June, 2000

7th June : Exploration Proto-Forum Discussion on expex ranking

26th JUNE - Position in CA 2000 Sequence

13th June : Expex/Capex Data Pack (early rankings/views) to RBAs for Consideration

19th June : Some Regions Holding RBAs & OUs Meeting (Improve data quality & identify implications of expex & capex ranking)

22-23th June : EXPEX Workshop 26th June : EXCOM Raw Data and Issues 27-28th June : CAPEX Workshop

(EP / SIG Alignment Meetings take place as required per region)

10th July : EXCOM Presentation on Expex, Devt Capex & with Early Financials

31st July : EXCOM Presentation on Final Expex & Capex 14th July : OU Investment level letters (Expex, Capex, etc)

11th Aug : OU Investment Confirmation (as per 2001 Scorecard Outlines)

Page 47: Excom Early Look Business Plan 2000 underdelivery.pdf · 2019-11-18 · Excom Early Look Business Plan 2000 . Slide 2 of 37 26 June, 2000 ... Proposed spend is ca $7 bln per year

Slide 47 of 37 26 June, 2000

Production Forecast per Region and CA Cat - Raw data.rep

KEY ISSUES - Decline of “Existing Asset” base

Capex mln ($ MOD)

Decline to by half in the plan period…… and cost $0.8 bln/yr to maintain

Production (kbbl/d)

Existing Assets Existing Assets

Page 48: Excom Early Look Business Plan 2000 underdelivery.pdf · 2019-11-18 · Excom Early Look Business Plan 2000 . Slide 2 of 37 26 June, 2000 ... Proposed spend is ca $7 bln per year

Slide 48 of 37 26 June, 2000

Production Forecast per Region and CA Cat - Raw data.rep

KEY ISSUES - Arresting the decline with post FID projects

Post FID projects do not arrest the decline…… but cost a further $1.4 bln/yr …...

Capex mln ($ MOD) Production (kbbl/d)

Existing Assets Existing Assets

Post FID projects

Post FID projects

Page 49: Excom Early Look Business Plan 2000 underdelivery.pdf · 2019-11-18 · Excom Early Look Business Plan 2000 . Slide 2 of 37 26 June, 2000 ... Proposed spend is ca $7 bln per year

Slide 49 of 37 26 June, 2000

KEY ISSUES - Arresting the decline Adding tranche activity…… cost a $0.8 bln/yr but does not halt the decline

Maintaining current production levels costs $5.1 bln in 2001 and av. of $3.0 bln over plan period

Existing Assets Existing Assets

Post FID projects

Post FID projects

Tranches Tranches

Page 50: Excom Early Look Business Plan 2000 underdelivery.pdf · 2019-11-18 · Excom Early Look Business Plan 2000 . Slide 2 of 37 26 June, 2000 ... Proposed spend is ca $7 bln per year

Slide 50 of 37 26 June, 2000

KEY ISSUES Arresting the decline - the new promises

Existing Assets Existing Assets

Post FID projects

Post FID projects

Tranches

Tranches

New development

New development

E&A follow up

E&A follow up

Production (kboe/d) Devt Capex ($ mln)

OU Ceilings

Page 51: Excom Early Look Business Plan 2000 underdelivery.pdf · 2019-11-18 · Excom Early Look Business Plan 2000 . Slide 2 of 37 26 June, 2000 ... Proposed spend is ca $7 bln per year

Slide 51 of 37 26 June, 2000

Country Summary report Regional view.rep

0

1000

2000

3000

4000

5000

6000

7000

8000

9000

2000 2001 2002 2003 2004 2005

KEY ISSUES - Allowing further Funds for Existing OUs.

Existing Assets

Post FID projects

Tranches

Devt Capex ($ mln)

OU Ceilings

New development

E&A follow up

Short Term Oil projects and new devts in existing OUs.

2001 2002 2003 2004 2005

Oil Contribution

0

10

20

30

40

50

UTC = ….. VIR avg = ….. Time to prodn = …..

Page 52: Excom Early Look Business Plan 2000 underdelivery.pdf · 2019-11-18 · Excom Early Look Business Plan 2000 . Slide 2 of 37 26 June, 2000 ... Proposed spend is ca $7 bln per year

Slide 52 of 37 26 June, 2000

BIG TICKET ITEMS…Planned to take FID by end 2002/early 2003

Sakhalin deal & Gas devt I 150+

Possible People Resources Reqd Capex Requirements $ mln (till 2005)

Saudi Gas development 100+

Zapolynaroye 50+

South Pars 25+

Brazil 25+ Angola 25+

Egypt 25+

Bangestan 25+

China deals 25+(?) Venezuela LNG (?)

MRH Entry Others …. 25+

Nigeria Global DW Business Staffed up

25+

Possibly 500+ Staff required ……..

Sakhalin 40 % Gas devt I Saudi Gas development

Zapolynaroye

South Pars

Bangestan

China deals Venezuela LNG

MRH Others (Kuwait, Lybia )

Brazil - BC-10+ Angola - Blk -18

Egypt - NEMED (no dilute) Nigeria -Ehra

MRH & CIS Business

1500 2400

550

370

670

1400

2000

740

600 7

600

900

Possibly requiring $11,000+ mln in plan period.

Page 53: Excom Early Look Business Plan 2000 underdelivery.pdf · 2019-11-18 · Excom Early Look Business Plan 2000 . Slide 2 of 37 26 June, 2000 ... Proposed spend is ca $7 bln per year

Slide 53 of 37 26 June, 2000

Shell Expro - Existing Assets capex

Page 54: Excom Early Look Business Plan 2000 underdelivery.pdf · 2019-11-18 · Excom Early Look Business Plan 2000 . Slide 2 of 37 26 June, 2000 ... Proposed spend is ca $7 bln per year

Slide 54 of 37 26 June, 2000

BSP Capex Corporate & Existing Assets

Page 55: Excom Early Look Business Plan 2000 underdelivery.pdf · 2019-11-18 · Excom Early Look Business Plan 2000 . Slide 2 of 37 26 June, 2000 ... Proposed spend is ca $7 bln per year

Slide 55 of 37 26 June, 2000

Page 56: Excom Early Look Business Plan 2000 underdelivery.pdf · 2019-11-18 · Excom Early Look Business Plan 2000 . Slide 2 of 37 26 June, 2000 ... Proposed spend is ca $7 bln per year

Slide 56 of 37 26 June, 2000

Page 57: Excom Early Look Business Plan 2000 underdelivery.pdf · 2019-11-18 · Excom Early Look Business Plan 2000 . Slide 2 of 37 26 June, 2000 ... Proposed spend is ca $7 bln per year

Slide 57 of 37 26 June, 2000

PRODUCTION PERFORMANCE FROM NEW PROJECTS IS DISAPPOINTING……...

POST FID Obaiyed CAPEX

0

10

20

30

40

50

60

70

2000 2001 2002 2003 2004 2005

mln

$ M

OD

1999 2000

OIL

0 2 4 6 8

10 12 14 16 18 20

2000 2001 2002 2003 2004 2005

Prod

uctio

n (x

'000

bbl

s/d)

1999 2000

Gas

0

0.2

0.4

0.6

0.8

1

1.2

1.4

1.6

2000 2001 2002 2003 2004 2005

mrd

Sm

3/yr

1999 2000

VALLE MORADO CAPEX - VALLE MORADO

0

5

10

15

20

25

30

2000 2001 2002 2003 2004 2005

Cap

ex (m

ln $

MO

D)

1999

2000

OIL - VALLE MORADO

0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 0.9

2000 2001 2002 2003 2004 2005

'000

bbl

s/d

1999 2000

GAS - VALLE MORADO

0

0.1 0.2 0.3

0.4

0.5 0.6 0.7

0.8

2000 2001 2002 2003 2004 2005

mrd

Sm

3/yr

1999 2000

Argentina

Egypt (…Rosetta same)

First slippage… then less hydrocarbons forecast

+ 15 well Infill Campaign

Page 58: Excom Early Look Business Plan 2000 underdelivery.pdf · 2019-11-18 · Excom Early Look Business Plan 2000 . Slide 2 of 37 26 June, 2000 ... Proposed spend is ca $7 bln per year

Slide 58 of 37 26 June, 2000

PRODUCTION PERFORMANCE FROM NEW PROJECTS IS DISAPPOINTING……...

Brigantine Development Brigantine Development

0

10

20

30

40

50

60

2001 2003 2005

mln

$ M

OD

1999 Capex

2000 Capex

Brigantine Development

0 0.2 0.4 0.6 0.8

1 1.2

2000 2001 2002 2003 2004 2005

'000

bbl

s/d

1999 Oil 2000 Oil

Brigantine Development

0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 0.9

2000 2002 2004

mrd

Sm

3/yr

1999 Gas 2000 Gas

42 FORCADOS YOKRI - NLNG 3 42 FORCADOS YOKRI - NLNG 3

0 20 40 60 80

100 120

2000 2001 2002 2003 2004 2005

mln

$ M

OD

1999 Capex 2000 Capex

42 FORCADOS YOKRI - NLNG 3

0 10 20 30 40 50 60 70

2000 2001 2002 2003 2004 2005

'000

bbl

s/d

1999 Oil 2000 Oil

42 FORCADOS YOKRI - NLNG 3

0 0.02 0.04 0.06 0.08

0.1 0.12 0.14 0.16 0.18

0.2

2000 2001 2002 2003 2004 2005 m

rd S

m3/

yr

1999 Gas 2000 Gas

UK

Nigeria

Page 59: Excom Early Look Business Plan 2000 underdelivery.pdf · 2019-11-18 · Excom Early Look Business Plan 2000 . Slide 2 of 37 26 June, 2000 ... Proposed spend is ca $7 bln per year

Slide 59 of 37 26 June, 2000

MAJOR Post-FID PROJECTS ….CAPEX Brutus - indications of capex rephasing… Onstream date unchanged

Bonga - indications of capex increase…… indications of slippage…… Onstream date unchanged

Shearwater - capex will be under budget & on time….

Brutus Capex

0 50

100 150 200 250 300 350

1998 2000 2002 2004 Time (Years)

Dev

t Cap

ex ($

mln

)

CA 1999 CA 2000

Costs are expected to be lower...

Bonga Devt Capex

0 50

100 150 200 250 300 350 400 450

2000 2002 2004 2006 Time (Years)

Dev

t Cap

ex ($

mln

)

CA 1999 CA 2000

- Increased drilling costs - Increased project mgmt costs

AOSP - indications that capex 2001 is larger than planned due to slippage in schedule……..

Nowrooz/Sarooz - 2001 & 2002 capex slippage…… Onstream date unchanged

POST-FID 2000 - Underspend Likely 2001 - $400 mln additional

Page 60: Excom Early Look Business Plan 2000 underdelivery.pdf · 2019-11-18 · Excom Early Look Business Plan 2000 . Slide 2 of 37 26 June, 2000 ... Proposed spend is ca $7 bln per year

Slide 60 of 37 26 June, 2000

MAJOR Post-FID PROJECTS IN PROGRESS….PRODUCTION Brutus - Peak production in 2002 & 2003 is now lower Not a barrel produced yet….. (Is this a meaningful signal …)

Bonga - Peak production in 2003 & 2004 is lower (system remodelling, revised subsea layouts & well timings)

Shearwater - Production unchanged , capex will be reduced vs budgets.

Brutus Oil Production

0 10 20 30 40 50 60 70 80 90 100

2000 2001 2002 2003 2004 2005 2006 Time (Years)

Oil

Prod

uctn

(kbb

l/d)

CA 1999 CA 2000

lower peak oil production but higher cum production by ca 40 mln bbl by 2016

Bonga Oil Production

40 50 60 70 80 90 100 110 120

2002 2003 2004 2005 2006 Time (Years) Prod

uctio

n (k

bbl/d

)

CA 1999 CA 2000

5 - 7 % decline following further studies.

- revised subsea layouts & well timings

POST-FID Production is lower across the board Cannot find examples of increases…..

Page 61: Excom Early Look Business Plan 2000 underdelivery.pdf · 2019-11-18 · Excom Early Look Business Plan 2000 . Slide 2 of 37 26 June, 2000 ... Proposed spend is ca $7 bln per year

Slide 61 of 37 26 June, 2000

“Big Ticket” Items Additional Capex vs BP ‘99 D

evt C

apex

($ m

ln)

Original FID Timings Revised FID Timings

0

500

1000

1500

2000

2500

3000

3500

2001 2002 2003 2004 2005

6062 5371 4962 4945 BP ‘99 CAPEX

Page 62: Excom Early Look Business Plan 2000 underdelivery.pdf · 2019-11-18 · Excom Early Look Business Plan 2000 . Slide 2 of 37 26 June, 2000 ... Proposed spend is ca $7 bln per year

Slide 62 of 37 26 June, 2000

Oil Production Difference Major Post FID Projects

1999 vs 2000 CA Raw Data Submission

-21% -12% -27%

+33%

+66%

+6%

-100 -50

0 50

100 150 200 250 300

2000 2001 2002 2003 2004 2005

Years

Mbo

pd

OIL mbopd

CA 1999 CA 2000 Difference % 2000 58 46 -12 -21% 2001 132 116 -16 -12% 2002 317 231 -86 -27% 2003 430 456 26 6% 2004 484 646 162 33% 2005 432 715 283 66%