Wärtsilä Brasil Power Plants “Eficiência Energética: projetos, determinações e investimentos” Abril / 2013 Jorge Alcaide 19 April 2013 1 © Wärtsilä

Evento Amcham 19 abril 2013 / 2013 Jorge Alcaide 1 ... Engines: 20 x Wärtsilä 18V34SG 14 x Wärtsilä 20V34SG Total output: 227 MW ... [email protected]

Embed Size (px)

Citation preview

Page 1: Evento Amcham 19 abril 2013 / 2013 Jorge Alcaide 1 ... Engines: 20 x Wärtsilä 18V34SG 14 x Wärtsilä 20V34SG Total output: 227 MW ... jorge.alcaide@wartsila.com

Wärtsilä BrasilPower Plants

“Eficiência Energética: projetos, determinações e investimentos”

Abril / 2013

Jorge Alcaide

19 April 20131 © Wärtsilä

Page 2: Evento Amcham 19 abril 2013 / 2013 Jorge Alcaide 1 ... Engines: 20 x Wärtsilä 18V34SG 14 x Wärtsilä 20V34SG Total output: 227 MW ... jorge.alcaide@wartsila.com

Content

1. Wärtsilä Corporation and main figures

2. Power generation market (world & Brazil energy demand)

3. Future of electricity production - Smart Power Generation

19 April 20132 © Wärtsilä

Page 3: Evento Amcham 19 abril 2013 / 2013 Jorge Alcaide 1 ... Engines: 20 x Wärtsilä 18V34SG 14 x Wärtsilä 20V34SG Total output: 227 MW ... jorge.alcaide@wartsila.com

SERVICES

POWER PLANTS

SHIP POWER

Our business areas

19 April 2013 CORPORATE PRESENTATION 20133 © Wärtsilä

Page 4: Evento Amcham 19 abril 2013 / 2013 Jorge Alcaide 1 ... Engines: 20 x Wärtsilä 18V34SG 14 x Wärtsilä 20V34SG Total output: 227 MW ... jorge.alcaide@wartsila.com

Our personnel

19 April 2013 CORPORATE PRESENTATION 20134 © Wärtsilä

Nearly 19,000 professionals,in 70 countries

Page 5: Evento Amcham 19 abril 2013 / 2013 Jorge Alcaide 1 ... Engines: 20 x Wärtsilä 18V34SG 14 x Wärtsilä 20V34SG Total output: 227 MW ... jorge.alcaide@wartsila.com

Wärtsilä in Brazil

New Niteroi workshop and office to support the offshore (O&G) business

New Niteroi workshop and office to support the offshore (O&G) business

Future Pernambuco workshop to support local PP installations and the shipping market

Future Pernambuco workshop to support local PP installations and the shipping market

Manaus workshop to support local PP installations and to facilitate the training of personnel in Wärtsilä Land & Sea Academy

Manaus workshop to support local PP installations and to facilitate the training of personnel in Wärtsilä Land & Sea Academy

• Wärtsilä Brasil Ltda was founded in 1990• 600 employees today• 29 power plants with installed power of

>2,5 GW

Rio de Janeiro workshop and downtown officesRio de Janeiro workshop and downtown offices

19 April 20135 © Wärtsilä

Page 6: Evento Amcham 19 abril 2013 / 2013 Jorge Alcaide 1 ... Engines: 20 x Wärtsilä 18V34SG 14 x Wärtsilä 20V34SG Total output: 227 MW ... jorge.alcaide@wartsila.com

• (9) TermoCabo, 52,6MW

•(6) Petrolina, 140 MW -HFO

• (5) UTE Bahia, 34MW - HFO

• (20) Santana, 63,7MW - LFO

• (12) Coteminas, 6,4MW (N. Gas)

• (15) Kaiser, 5,2MW – (N. Gas)

•(24) Manaus Energia,164,9MW - HFO

•(29) Termo Norte, 65,2MW - LFO

•(27) Solimões, 4MW - HFO

•(26) Hermasa, 15,8MW -HFO

•(25) Reman, 6,8MW - HFO

• (2)O Globo, 5,4MW (N. Gas)

• (11) Coca Cola, 3,6MW (N. Gas)

•(28) Rio Branco, 10,5MW - HFO

•(23) Gera Manaus 85MWdual Fuel

• (22) Manauara 85MWDual Fuel

•(21) Rio Amazonas 85MW dual Fuel

Brazil installed base, April 2013

• (3) Viana, 176MW -HFO•(4) Linhares, 204MW (N. Gas)

• (17) (18) Geramar I & II, 331MW - HFO

• (10) Suape II, 380MW -HFO

• (13) Borborema 176MW• (14) Maracanaú I, 168 MW -HFO

April 2013

• 29 Power Plants• 2,560 MW installed capacity• 1,800 MW under O &M contract •(1) Itaipú, 15,8MW - LFO

Sistema isolado

Sistema interligado

• (16) Nova 9,3 MW-(N. Gas)

• (7) Itaguassú 12 MW (N. Gas)

• (8) Pernambuco III, 200MW HFO -

•(19) P IV 56MW (N. Gas)

19 April 20136 © Wärtsilä

Page 7: Evento Amcham 19 abril 2013 / 2013 Jorge Alcaide 1 ... Engines: 20 x Wärtsilä 18V34SG 14 x Wärtsilä 20V34SG Total output: 227 MW ... jorge.alcaide@wartsila.com

1) Figures exclude non-recurring restructuring items and selling profits.

Financial highlights

MEUR 2012 2011 2010 2009

Order intake 4 940 4 516 4 005 3 291

Order book at the end of the period 4 492 4 007 3 795 4 491

Net sales 4 725 4 209 4 553 5 260

Operating result1 515 469 487 638

% of net sales1 10.9 11.1 10.7 12.1

Earnings/share, EUR 1.72 1.44 1.96 1.97

19 April 20137 © Wärtsilä

Page 8: Evento Amcham 19 abril 2013 / 2013 Jorge Alcaide 1 ... Engines: 20 x Wärtsilä 18V34SG 14 x Wärtsilä 20V34SG Total output: 227 MW ... jorge.alcaide@wartsila.com

Power Plants

19 April 20138 © Wärtsilä

Page 9: Evento Amcham 19 abril 2013 / 2013 Jorge Alcaide 1 ... Engines: 20 x Wärtsilä 18V34SG 14 x Wärtsilä 20V34SG Total output: 227 MW ... jorge.alcaide@wartsila.com

Electricity consumption

-2,00%

0,00%

2,00%

4,00%

6,00%

8,00%

1990

1992

1994

1996

1998

2000

2002

2004

2006

2008

2010

Electricity yearly cons. growth %

GDP yearly growth rate %

0

4.000.000

8.000.000

12.000.000

16.000.000

20.000.000

1990

1992

1994

1996

1998

2000

2002

2004

2006

2008

2010

Electricity final consumption

Electricity consumption of industry

Electricity consumption of residential, services,agriculture

Source: Enerdata

Electricity Consumption & GDP GrowthWorld Electricity ConsumptionGWh

Reasons for growth of electricity demand • Electrification (heat pumps, appliances...)• GDP growth• Increasing standard of living

Growth will continue• Recession may stagnate demand growth• GDP growth – divided world!

19 April 20139 © Wärtsilä

Page 10: Evento Amcham 19 abril 2013 / 2013 Jorge Alcaide 1 ... Engines: 20 x Wärtsilä 18V34SG 14 x Wärtsilä 20V34SG Total output: 227 MW ... jorge.alcaide@wartsila.com

Economic growth to drive the increase in installed power

0

500

1 000

1990 1995 2000 2005 2010 2015 2020 2025 2030

National energy demand (TWh / year)

-10

-8

-6

-4

-2

0

2

4

6

8

10

1998 1999 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011

GDP Electrical Energy Consumption

Annual change in GDP vs. increase in electrical energy consumption (% p.a.)

2001 Rationing 2008 Financial Crisis

Source: EPE Plano Nacional de Energia 2030 and IBGE; MME

% TWh

The National Energy Agency EPE anticipates the annual energy demand to more than double during 2010 - 2030, from less than 500 TWh to more than 1000 TWh per year

The historically strong correlation between real GDP growth and the annual increase in eletrical energy consumption suggests that the strong demand for power plants is to continue.

19 April 201310 © Wärtsilä

Page 11: Evento Amcham 19 abril 2013 / 2013 Jorge Alcaide 1 ... Engines: 20 x Wärtsilä 18V34SG 14 x Wärtsilä 20V34SG Total output: 227 MW ... jorge.alcaide@wartsila.com

19 April 2013 CORPORATE PRESENTATION 201311 © Wärtsilä19 April 201311 © Wärtsilä

Page 12: Evento Amcham 19 abril 2013 / 2013 Jorge Alcaide 1 ... Engines: 20 x Wärtsilä 18V34SG 14 x Wärtsilä 20V34SG Total output: 227 MW ... jorge.alcaide@wartsila.com

19 April 2013 CORPORATE PRESENTATION 201312 © Wärtsilä19 April 201312 © Wärtsilä

Page 13: Evento Amcham 19 abril 2013 / 2013 Jorge Alcaide 1 ... Engines: 20 x Wärtsilä 18V34SG 14 x Wärtsilä 20V34SG Total output: 227 MW ... jorge.alcaide@wartsila.com

Smart Power Genetarion - Movie

19 April 201313 © Wärtsilä

Page 14: Evento Amcham 19 abril 2013 / 2013 Jorge Alcaide 1 ... Engines: 20 x Wärtsilä 18V34SG 14 x Wärtsilä 20V34SG Total output: 227 MW ... jorge.alcaide@wartsila.com

Cumulative capacity

0

1000

2000

3000

4000

5000

6000

2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012

GW

Nuclear Coal Gas Oil Other thermal Hydro Pumped Storage Wind Solar

19 April 201314 © Wärtsilä

Page 15: Evento Amcham 19 abril 2013 / 2013 Jorge Alcaide 1 ... Engines: 20 x Wärtsilä 18V34SG 14 x Wärtsilä 20V34SG Total output: 227 MW ... jorge.alcaide@wartsila.com

• GDP growth, electrification and increasing standard of living drive the growth of electricity demand

• Demand for sustainability and focus on climate change

• Rapid growth of intermittent renewable generation

• Escalating daily, weekly and seasonal demand fluctuation increases the need for flexibility

• Increasing role of gas, especially as a balancing fuel

• Ageing installed capacity drives investments in new technologies

The world needs affordable, clean, flexibleand reliable power.

Market trends and drivers

19 April 201315 © Wärtsilä

Page 16: Evento Amcham 19 abril 2013 / 2013 Jorge Alcaide 1 ... Engines: 20 x Wärtsilä 18V34SG 14 x Wärtsilä 20V34SG Total output: 227 MW ... jorge.alcaide@wartsila.com

16 © Wärtsilä

Coal power plants Load

Wind generation

Gas generation

Plains End power plantsWärtsilä’s flexible generation

PLAINS END POWER PLANT, COLORADO, USA

Type: Grid stabilityEngines: 20 x Wärtsilä 18V34SG

14 x Wärtsilä 20V34SGTotal output: 227 MWFuel: Natural gasInstalled: 2002 and 2008

Remote controlled from Colorado Dispatch Center

Screen shot from Colorado Dispatch Center, Xcel Energy, USA3 May 2008

Estudo de Caso: Smart wind chasing in Colorado, US

19 April 201316 © Wärtsilä

Page 17: Evento Amcham 19 abril 2013 / 2013 Jorge Alcaide 1 ... Engines: 20 x Wärtsilä 18V34SG 14 x Wärtsilä 20V34SG Total output: 227 MW ... jorge.alcaide@wartsila.com

19 April 2013 CORPORATE PRESENTATION 201317 © Wärtsilä19 April 201317 © Wärtsilä

Page 18: Evento Amcham 19 abril 2013 / 2013 Jorge Alcaide 1 ... Engines: 20 x Wärtsilä 18V34SG 14 x Wärtsilä 20V34SG Total output: 227 MW ... jorge.alcaide@wartsila.com

Power generation in Brazil – forecast for future

Smart Power Generation is a new concept which enables an existing power system to operate at maximum efficiency by effectively absorbing current and future system load variations, providing significant savings.

Reliable Sustainable

Affordable

Smart Power

Generation

19 April 201318 © Wärtsilä

ChallengesFirm energy is necessary. New hydro projects are based on run-of-river concept, i.e. without huge reservoirs / wind power will not be able to assure the system reliability / solar will be introduced in the energy matrix.

Balancing offer / demand / price equation is a must. This discussion shall be solved.

Up to 2020 the main hydro plants without huge requisitions about environmental questions shall be under construction or under design, after that it will be difficult to explore the Brazilian hydro potential (located in Amazonas region, where the environmental questions are the key).

NG is going to be a bridge to link today's period t o the future.

Nuclear will be the next target to the government.

1 - The electrical sector expansion will be based on :Conventional electric power generation (means hydro) / Renewable / Thermal power

2 - The energy consumption is going to double from 2 010 to 2030

3 - Natural gas will be available (it is the future of pre-salt exploration and LNG availability)

Page 19: Evento Amcham 19 abril 2013 / 2013 Jorge Alcaide 1 ... Engines: 20 x Wärtsilä 18V34SG 14 x Wärtsilä 20V34SG Total output: 227 MW ... jorge.alcaide@wartsila.com

Jornal Valor Econômico

19 April 201319 © Wärtsilä

Page 20: Evento Amcham 19 abril 2013 / 2013 Jorge Alcaide 1 ... Engines: 20 x Wärtsilä 18V34SG 14 x Wärtsilä 20V34SG Total output: 227 MW ... jorge.alcaide@wartsila.com

Maximum efficiency = Highest energy efficiency, lower emissions, dramatic savingsSmart Power Generation concept system savings have been proven in several power systemsSPG can provide spinning reserve while it is NOT spinning, using no fuel

Smart Power Generation

Smart Power Generation is a new concept which enables an existing power system to operate at its maximum efficiency by most effectively absorbing current and future system load variations, providing dramatic savings.

Wärtsilä is the leader inSmart Power Generation!

AFFORDABLE

SMARTPOWERSYSTEM

RELIABLE SUSTAINABLESMARTPOWER

GENERATION

ENERGYEFFICIENCY

OPERATIONALFLEXIBILITY

FUEL FLEXIBILITY

19 April 201320 © Wärtsilä

Page 21: Evento Amcham 19 abril 2013 / 2013 Jorge Alcaide 1 ... Engines: 20 x Wärtsilä 18V34SG 14 x Wärtsilä 20V34SG Total output: 227 MW ... jorge.alcaide@wartsila.com

SMARTPOWERGENERATION.COM

21 © Wärtsilä

[email protected]

www.smartpowergeneration.com